E-mail This Page

Please wait... loading

Phasor Working Group



Information Repository Posting Date
PMU Installation & Integration Basics:
Basic Considerations (PDF) 07.16.2008
Basic System Requirements (PDF) 07.16.2008
Installation Design (PDF) 07.16.2008
Initial Checkout (PDF) 07.16.2008
NASPI Installation & Commissioning Guide (DOC) 07.16.2008
Installation Experience - Manitoba Hydro (PDF) 07.16.2008
Installation Specifics:
TVA - Standard Connection Requirements (PDF) 07.16.2008
TVA - System Checkout & Acceptance Guide (PDF) 07.16.2008
Phasor Point Naming Convention (DOC) 07.16.2008
PMU Performance Considerations:
NASPI Test and Calibration Guide (PDF) 07.16.2008
NIST Tests & Calibration (PDF) 07.16.2008
 
Links to Additional Resources

NASPI Site

NASPI Repository of Tools for Phasor Data and Their Applications

NASPI Research Repository

 
Postings Posting Date
MISO NASPI Team Conference Call Agenda June 2008 (PDF) 06.17.2008
Streaming Data Bandwidth Calculator (XLS) 06.04.2008
PJM's 2008 Synchropahsor Initiatives (PPT) 06.02.2008
Synchrophasor presentation by GE's Mark Adamiak (PDF) 06.02.2008
 
Meeting Materials - February 10, 2009 Posting Date
Agenda (PDF) 01.30.2009
 
Meeting Materials - October 7, 2008 Posting Date
Agenda (PDF) 10.08.2008
Minutes (PDF)     01.30.2009
AEP Synchro-Phasor Infrastructure (PDF) 10.08.2008
NASPI Data Architecture (PDF) 10.08.2008
NERC Cyber Security Standards (PDF) 10.08.2008
Phasor System Networks Overview and Installation Issues (PDF) 10.08.2008
PMU Placement Update (PDF) 10.08.2008
SynchroPhasor Applications (PDF) 10.08.2008
 
Meeting Materials - June 25, 2008 Posting Date
Agenda (PDF) 06.18.2008
Minutes (PDF) 07.14.2008
Item 02 - AEP Phasor Presentation PJM Final (PDF) 07.14.2008
Item 04 - NASPI Overview Presentation to PJM (PDF) 07.14.2008
Item 06 - PJM Project Updates (PDF) 07.14.2008
Item 07 - TO PMU Install List (XLS) 09.29.2008

View Issue Tracking