Print Email
E-mail This Page

Please wait... loading

Duke Integration Stakeholder Group

On June 25, 2010, Duke Energy Ohio, Inc. and Duke Energy Kentucky, Inc, subsidiaries of Duke Energy Corporation, filed with the Federal Energy Regulatory Commission (FERC) to withdraw their transmission assets from Midwest Independent System Operator and to place them into PJM Interconnection as of January 1, 2012. In addition to the Duke Ohio and Duke Kentucky transmission assets, the filing includes the integration of Duke-owned and jointly-owned generation assets.

PJM will work with the Duke subsidiaries listed above, other generator owners and load serving entities in the Duke Ohio and Duke Kentucky footprints, and all interested stakeholders to ensure that the Duke integration is accomplished safely and reliably and in accordance with all reliability standards and market rules.

For the convenience of those unable to travel to Cincinnati, there will now be a simultaneously scheduled secondary meeting location in Wilmington, DE. This secondary location will feature live discussion and presentations via remote video feed and teleconferencing.


Upcoming Meetings
There are currently no meetings scheduled.


Meeting Materials
Meeting Dates
 09.17.2010 - Duke Integration Stakeholder Group Meeting - Cincinnati
 09.17.2010 - Duke Integration Stakeholder Group Meeting - Wilmington