Print Email
E-mail This Page

Please wait... loading

Reports

Here you will find reports, including white papers submitted to the FERC and other documents.

Reports Access this content via a news reader
 
Posting Date
Utilicast Final Report - JOA Baseline Review (PDF) 01.31.2012
2012 Load Forecast Report (PDF) 01.17.2012
2012 Load Forecast Report - Data (XLS) 01.17.2012
PJM Board Response Regarding Request for Board Action on RPM Self-Supply and FRR Options (PDF) 12.20.2011
Initial PJM Comments on Brattle/MISO Capacity Market Seam Report (PDF) 12.15.2011
PJM Board Letter to Ohio Commission Regarding 2011 RPM Performance Assessment (PDF) 12.02.2011
PJM Board Letter to MD, NJ, DE and DC Commissions Regarding 2011 RPM Performance Assessment (PDF) 11.11.2011
PJM Letter to Members Regarding Upcoming Transmission Outage (PDF) 09.01.2011
Brattle Report Second Performance Assessment of PJM Reliability Pricing Model (PDF) 08.29.2011
Brattle Report on Cost of New Entry Estimates for CT & CC Plants in PJM (PDF) 08.26.2011
Coal Capacity at Risk for Retirement in PJM: Potential Impacts of the Finalized EPA Cross State Air Pollution Rule and Proposed National Emissions Standards for Hazardous Air Pollutants (PDF) 08.26.2011
Letter About MAPP (PDF) 08.19.2011
2010 PJM Market Highlights: A Summary of Trends and Insights (PDF) 05.13.2011
PJM Whitepaper on Price Responsive Demand (PDF) 03.03.2011
Statement on Planning for Transmission in the 21st Century from Terry Boston on Behalf of the PJM Board (PDF) 02.28.2011
PJM IMM Joint Statement on DR Double-Counting (PDF) 02.04.2011
2011 Load Forecast Report (PDF) 01.14.2011
2011 Load Forecast Report - Data (XLS) 01.14.2011
PJM and Monitoring Analytics letter to the NJ Board of Public Utilities Regarding Minimum Offer Price Rule (PDF) 12.15.2010
PJM Backbone High Voltage Transmission System (PDF) 12.07.2010
PJM Regional Transmission Expansion Planning Process - September 2010 (PDF) 12.07.2010
Public Policy Considerations and Drivers (PDF) 12.07.2010
Tierney Presentation to the Board, October 11, 2010 (PDF) 10.12.2010
PJM Letter about MAPP (PDF) 08.16.2010
PJM Letter to Potomac-Appalachian Transmission Highline, LLC (PDF) 06.18.2010
OPSI President McKinney Letter to PJM President Boston Regarding Transmission Cost Allocation (PDF) 06.08.2010
PJM President Boston Letter to the Marginal Losses User Group (PDF) 05.26.2010
ISO/RTO Assessment of Plug-in Electric Vehicle Integration with ISO/RTO Systems (PDF) 03.23.2010
A Survey of Transmission Cost Allocation Issues, Methods, and Practices (PDF) 03.11.2010
A Review of Generator Costs and Compensation (PDF) 03.04.2010
Load Management Performance Report 2009 - 2010 (PDF) 12.29.2009
2009 PJM Strategic Direction (PDF) 12.04.2009
2009 PJM Reserve Requirement Study (PDF) 11.30.2009
RTEP Development Process (PDF) 06.11.2009
PJM’s Comments regarding the 2008 State of the Market Report (PDF) 04.07.2009
2008 Regional Transmission Expansion Plan Report  02.27.2009
Potential Effects of Proposed Climate Change Policies on PJM’s Energy Market (PDF) 01.27.2009
2008 Brattle Report on RPM (PDF) 06.30.2008
PJM’s Reliability Pricing Mechanism - LECG, LLC (PDF) 04.28.2008
How RTOs Establish Spot Market Prices - LECG, LLC (PDF) 04.28.2008
PJM Response to APPA Paper (PDF) 04.18.2008
PJM Comments on the 2007 State of the Market Report (PDF) 04.11.2008
Board Special Investigative Committee Report
Deemed Savings Report For Air Conditioner and Water Heater Programs (PDF) - This report presents the results of load research to establish the impact of legacy direct control programs across the PJM RTO. Its results are available to all Participants for use in certifying these types of programs as Load Management. 04.06.2007
PJM Regional Transmission Expansion Plan
Quantifying Demand Response Benefits In PJM (PDF)-This study conducted for MADRI found that demand response in the Mid-Atlantic region would reduce energy prices by at least $57 million annually. 01.30.2007
Analysis of the Impact of Coordinated Electricity Markets on Consumer Electricity Charges (PDF) - This analysis, which reinforces the conclusions of other studies comparing prices in regulated and non-regulated areas, adds to the body of evidence demonstrating the benefits of wholesale competitive markets. 11.29.2006
Final 120 Day Report (PDF) 05.30.2006
The Value of Independent Regional Grid Operators (PDF) 11.14.2005