Print Email
E-mail This Page

Please wait... loading

2005 Regional Transmission Expansion Plan

The following files contain PJM's annual Regional Transmission Expansion Plan (RTEP) report, dated February 22, 2006 that reflects planned system upgrades announced by PJM through December 31, 2005. To order an electronic version on CD, please contact Diane Lake at 610.666.4725 or Jeannette Mittan at 610.666.3158.

Version 2.0, which appears below, incorporates an interactive table of contents and bookmark function to facilitate user navigation of the document. In addition, since original publication on February 22, 2006, several data inconsistencies were brought to PJM's attention. Those inconsistencies are corrected in this version. 

Section 1 (PDF)
Section 2 (PDF)
Section 3 (5MB PDF)
Section 4 (10MB PDF)
Section 5 (2MB PDF)
Section 6 (PDF)

Regional Transmission Expansion Plan (19MB PDF)

Errata- 04.10.2006 (PDF)

A complete detailed list of all RTEP baseline, network and TOI upgrades can be found on our Baseline Reports Web page, which includes the $1.3 billion of system reinforcements reviewed at the May 23, 2006 Transmission Expansion Advisory Committee meeting and approved by the PJM Board of Managers on June 22, 2006. A full description of these system reinforcements and the 10 options for 15-year evaluation as approved by the PJM Board of Managers on June 22, 2006 can be found in the May 23, 2006 PJM presentation to the TEAC.

Table of all RTEP Upgrades

RTEP Archives 
2008 RTEP Report 
2007 RTEP Report 
2006 RTEP Report