| Current Available Transfer Capability Implementation Document - ATCID (PDF) |
|
|
|
| Current CBM Implementation Document - CBMID (PDF) |
|
| Current TRM Implementation Document - TRMID (PDF) |
|
| ATC Methodology Contact (PDF) |
|
| Current Load Forecast Descriptive Statement (PDF) |
|
| Current Postback Methodology (PDF) |
|
| Current Flowgate Methodology Grandfathered Agreements (PDF) |
|
|
|
| Some of these documents are updated periodically. Please email PJMATCMethodologyContact@pjm.com or contact the OASIS Hotline at (610) 666-8972 to request the latest file to be posted. |
|
Posting Date |
| PJM Coordinated Flowgates (PDF) |
01.04.2012 |
| Allocation Results (CSV) |
02.06.2012 |
| AFC and ATC Algorithms (PDF) |
07.20.2009 |
| Flowgate Definitions, CBM and TRM (CSV) |
01.19.2012 |
| Flowgate Definitions Header Names (XLS) |
12.09.2011 |
| CBM Reevaluation Process (PDF) |
09.20.2011 |
| PJM processing of long-term point-to-point service requests for existing Duquesne capacity resources (PDF) |
03.28.2008 |
| PJM Simultaneous Import Capability Report Disclaimer (PDF) |
01.31.2008 |
| Archived Transmission Requests (ZIP) |
03.19.2007 |
| Available Flowgate Capability (AFC) on PJM Flowgates Instructions (DOC) |
06.21.2007 |
| List of Flowgates Limiting WPC Non-Firm Service for Long-Term Solution (PDF) |
03.19.2007 |
| Available Flowgate Capability (AFC) on PJM Flowgates Updated Every Business Day (CSV) |
|
| Outage Changes Report (TXT) |
|
| M2M Data Exchange with MISO (PDF) |
07.15.2011 |
|
|
| Load Data and Forecasts |
|
| PJM Forecasted Zonal Loads (TXT) |
|
| Preliminary Hourly Load Data |
|