Print Email
E-mail This Page

Please wait... loading

ATC Information

Current Available Transfer Capability Implementation Document - ATCID (PDF)
Current CBM Implementation Document - CBMID (PDF)
Current TRM Implementation Document - TRMID (PDF)
ATC Methodology Contact (PDF)
Current Load Forecast Descriptive Statement (PDF)
Current Postback Methodology (PDF)
Current Flowgate Methodology Grandfathered Agreements (PDF)
Some of these documents are updated periodically. Please email PJMATCMethodologyContact@pjm.com or contact the OASIS Hotline at (610) 666-8972 to request the latest file to be posted.
Posting Date
PJM Coordinated Flowgates (PDF) 01.04.2012
Allocation Results (CSV) 02.06.2012
AFC and ATC Algorithms (PDF) 07.20.2009
Flowgate Definitions, CBM and TRM (CSV) 01.19.2012
Flowgate Definitions Header Names (XLS) 12.09.2011
CBM Reevaluation Process (PDF) 09.20.2011
PJM processing of long-term point-to-point service requests for existing Duquesne capacity resources (PDF) 03.28.2008
PJM Simultaneous Import Capability Report Disclaimer (PDF) 01.31.2008
Archived Transmission Requests (ZIP) 03.19.2007
Available Flowgate Capability (AFC) on PJM Flowgates Instructions (DOC) 06.21.2007
List of Flowgates Limiting WPC Non-Firm Service for Long-Term Solution (PDF) 03.19.2007
Available Flowgate Capability (AFC) on PJM Flowgates Updated Every Business Day (CSV)
Outage Changes Report (TXT)
M2M Data Exchange with MISO (PDF) 07.15.2011
Load Data and Forecasts
PJM Forecasted Zonal Loads (TXT)
Preliminary Hourly Load Data