Post Contingency Local Load Relief Warning
The Post Contingency Local Load Relief Warning (PCLLRW) tool is utilized in the coordination of post-Contingency load shed plans (as part of Operating Plans) between PJM and impacted Transmission Owners (TO).
The PCLLRW tool is for PJM registered TOs only. Non-TO members interested in PCLLRW events can retrieve this data within the Emergency Procedure tool.
Production: Sign In | Register
Training Environment: Sign In | Register
CEII requirements for requesting access
Acceptable Terms of Use
Data connections should not exceed 600 per minute.
Videos