RPM Auction User Information


The Reliability Pricing Model (RPM) is comprised of one base residual auction and up to three incremental auctions per delivery year (June 1 – May 31). The information on this page presents general information as it pertains to each delivery year, including modeling information, planning parameters, and summary auction results.

Participant-level information may be accessed via the eRPM system.

Login

eRPM application information is available on the eRPM eTools Web page.

    Posting Date
RPM Brattle Report (PDF)  
06.30.2008
RPM Schedule (XLS)  
03.19.2008
Non-Unit Specific Capacity Transaction Pricing Points (PDF)  
06.25.2008
Key Expected Transmission Upgrades (XLS)   02.15.2007
2007/2008 Peak Hour Period Availability Calculator (XLS)   09.10.2008
Peak Hour Period Availability FAQ (PDF)   09.10.2008

CIRs Notification

This notification will serve as a reminder to all parties that, pursuant to section 230.3.1 of the PJM Tariff, a generating resource that fails to test at the capacity level associated with its accredited Capacity Interconnection Rights (CIRs) for three consecutive summer seasonal verification periods will not maintain that level of CIRs. Therefore, if any generator under your control fails to attain such capacity level for the 2006, 2007 and 2008 summer seasonal verification testing period (June-July-August test period), you will be notified by November 1, 2008 regarding any reduction of CIRs by unit. According to the PJM Manual 21 (at 8), the current deadline for submittal of the summer seasonal verification test results is September 30. Accordingly, the summer seasonal verification test must be performed by August 31 and reported to PJM through eGADS by September 30, 2008.

Please be advised that you will be responsible to satisfy any capacity obligations for such unit(s) that have been committed as a Capacity Resource under the PJM Regional Pricing Model Auction (RPM Auction) for the remainder of the 2008/2009 delivery year, as well as any future delivery years. In order to regain any generating resource’s lost CIRs, you will be required to submit an Interconnection Request for each generating resource in accordance with Parts IV and VI of the PJM Tariff.


Show All
Delivery Year
2007/2008
    Posting Date
RTO VRR Curve Calculation (XLS)   03.14.2008
2007 RECS Allocation (PDF)  
12.07.2006
2007/2008 BRA LDA Specific Supply Curves (PDF)   06.29.2007
2007/2008 Base Residual Auction Results (XLS)   05.31.2007
2007/2008 EFORp Operating Reserve Threshold Values (XLS)   03.13.2008
2007/2008 Non-Unit Specific Transaction Pricing Points (XLS)   05.31.2007
2007/2008 BRA Mitigated Supply Breakdown (PDF)   03.07.2008
2007/2008 RPM Zonal Scaling Factors (PDF)   09.10.2008
FRR Resources 2007-2008 (XLS)   03.19.2007
RPM Resource Model (XLS)   11.12.2007
Preliminary Market Structure Screen (PDF)  
02.02.2007
Planning Period Parameters (XLS)   10.29.2007
Summer Coincident Peak Load for 2007-2010 (PDF)   01.08.2007
2008/2009
    Posting Date
2008/2009 RECS Allocation (PDF)   05.02.2008
2008/2009 Load Management Summary by Zone (XLS)   04.17.2008
RTO VRR Curve Calculation (XLS)   03.14.2008
2008/2009 Third Incremental Auction Report (PDF)  
01.17.2008
2008/2009 Base Residual Auction Results (XLS)  
04.03.2008
2008/2009 Non-Unit Specific Pricing Points (XLS)  
06.25.2008
2008/2009 Base Residual Auction Report (PDF)  
07.13.2007
2008/2009 BRA Mitigated Supply Breakdown (PDF)  
03.07.2008
2008/2009 RPM Zonal Scaling Factors (PDF)  
09.10.2008
FRR Resources 2008-2009 (XLS)  
03.13.2008
RPM Resource Model (XLS)  
11.12.2007
Preliminary Market Structure Screen Results - 2008/2009 Auction (PDF)  
04.02.2007
Planning Period Parameters (XLS)   10.29.2007
Summer Coincident Peak Load for 2007-2010 (PDF)   01.08.2007
2009/2010
    Posting Date
RTO VRR Curve Calculation (XLS)   03.14.2008
2009/2010 Base Residual Auction Results (XLS)   10.17.2007
2009/2010 Non-Unit Specific Pricing Points (XLS)   06.25.2008
2009/2010 Base Residual Auction Report (PDF)
  10.17.2007
2009/2010 BRA Mitigated Supply Breakdown (PDF)   03.07.2008
2009/2010 RPM Zonal Scaling Factors (PDF)   09.10.2008
FRR Resources 2009-2010 (XLS)   03.13.2008
RPM Resource Model (XLS)   11.12.2007
Preliminary Market Structure Screen Results - 2009/2010 Auction (PDF)   07.13.2007
Planning Period Parameters (XLS)  

10.29.2007

Summer Coincident Peak Load for 2007-2010 (PDF)   01.08.2007
2010/2011
    Posting Date
2010/2011 RPM Zonal Scaling Factors (PDF)   09.10.2008
RTO VRR Curve Calculation (XLS)   03.14.2008
RPM Resource Model (XLS)   11.30.2007
PJM Board Decision to NOT Implement New LDA (PDF)   11.02.2007
Planning Period Parameters (XLS)   01.11.2008
Key Expected Transmission Upgrades (XLS)   10.26.2007
Preliminary Market Structure Screen Results - 2010/2011 Auction (PDF)   10.01.2007
FRR Resources 2010-2011 (XLS)   03.13.2008
2010/2011 MAAC and SWMAAC Mitigated Supply Curves (PDF)   02.12.2008
2010/2011 Base Residual Auction Results (XLS)   02.01.2008
2010/2011 Non-Unit Specific Pricing Points (XLS)   06.25.2008
2010/2011 Base Residual Auction Report (PDF)   02.01.2008
2010/2011 BRA Mitigated Supply Breakdown (PDF)   03.07.2008
2011/2012
    Posting Date
2011/2012 RPM Zonal Scaling Factors (PDF)   09.10.2008
FRR Resources 2011/2012 (PDF)   05.21.2008
2011/2012 RPM Capacity by State and Fuel Type (PDF)   05.20.2008
2011/2012 DR Offered (By Zone) (PDF)   05.20.2008
2011/2012 Base Residual Auction Report (PDF)   05.15.2008
2011/2012 Non-Unit Specific Pricing Points (XLS)   06.25.2008
2011/2012 Base Residual Auction Results (XLS)   05.15.2008
Duquesne Light Letter to FERC and PJM (PDF)   02.01.2008
Key Expected Transmission Upgrades (XLS)   02.01.2008
Deadlines for Planned Generation, QTU, & ICTRs (PDF)   02.01.2008
Planning Period Parameters (XLS)   05.16.2008
Preliminary Market Structure Screen Results - 2011/2012 Auction (PDF)   02.04.2008
Proposed Update to CONE (XLS)   12.04.2007
RPM Resource Model (XLS)   04.28.2008
Market Trials and Simulations
    Posting Date
2008/2009 Market Trial Settlement (XLS)   03.22.2007
RPM Market Trial Issues (PDF)   03.15.2007
2007/2008 Market Trial Settlement (XLS)   03.15.2007
RPM Prototype Simulations - FERC Settlement VRR Curve (PDF)  
12.28.2006