Pepco


Date
PHI Approved Material Suppliers PDF  1.29.2026
Exelon Mid-Atlantic Interconnection Guidelines PDF  1.29.2026
Exelon Transmission Facility Interconnection Requirements PDF
 1.1.2024
Approved Contractor Lists for Design and Execution PDF   2.18.2026
PHI Approved T&S Materials List PDF   7.5.2023
Exelon Utilities Transmission Bus Configuration Design Philosophy PDF  5.19.2021
PHI Technical Considerations for Generation Parallel Operations PDF
10.13.2016
PHI Operations and Modifications Requirements PDF
10.10.2011
   
Historical Standards: Exelon ZIP




Page last modified: Wednesday, February 18, 2026
PJM © 1999-2026 All rights reserved.