ATTACHMENT Y
Screens Process Interconnection Request
(For Generation Facilities of 2MW or Less)
1.0 Instructions:
Interconnection Customer must submit the Screens Process Interconnection Request to transmission Provider by hand delivery, mail, e-mail, or fax.
2.0 Processing Fee or Deposit
Interconnection Customer is required to provide the Transmission Provider the applicable initial deposit and the applicable non-refundable base deposit (all per MW amounts to be proportionately allocated to .1 (onetenth) of a megawatt) for a proposed interconnection of a generation facility of 2 MW or less.
The base and initial per MW deposit received will be credited toward the amount of the Generation Interconnection Customer’s cost responsibility for the Generation Interconnection Feasibility Study and other studies or reviews conducted under Part IV or Part VI of the Tariff.
3.0 Interconnection Customer Information
4.0 Energy Resource Information
5.0 Energy Resource Characteristic Data (for inverter-based machines)
6.0 Energy Resource Characteristic Data (for rotating machines)
7.0 Interconnection Facilities Information
Will a transformer be used between the generator and the point of common coupling?
Yes
No
Will the transformer be provided by the Interconnection Customer?
Yes
No
Transformer Fuse Data (If Applicable, for Interconnection Customer-Owned Transformer):
(Attach copy of fuse manufacturer's Minimum Melt and Total Clearing Time-Current Curves)
Interconnecting Circuit Breaker (if applicable):
Interconnection Protective Relays (If Applicable):
If Microprocessor-Controller:
List of Functions and Adjustable Setpoints for the protective equipment or software:
If Discrete Components:
(Enclose Copy of any Proposed Time-Overcurrent Coordination Curves)
Current Transformer Data (If Applicable):
(Enclose Copy of Manufacturer's Excitation and Ratio Correction Curves)
Potential Transformer Data (If Applicable):
8.0 Diagrams and Site Control Documentation
Enclose copy of site electrical one-line diagram showing the configuration of all Energy Resource equipment, current and potential circuits, and protection and control schemes. This one-line diagram must be signed and stamped by a licensed Professional Engineer if the Energy Resource is larger than 50 kW. Is one-line diagram enclosed?
Yes
No
Enclose copy of any site documentation that indicates the precise physical location of the proposed Energy Resource ( e.g., USGS topographic map or other diagram or documentation).
Proposed location of protective interface equipment on property (include address if different from the Interconnection Customer's address)
Enclose copy of any site documentation that describes and details the operation of the protection and control schemes. Is available documentation enclosed?
Yes
No
Enclose copies of schematic drawings for all protection and control circuits, relay current circuits, relay potential circuits, and alarm/monitoring circuits (if applicable).
Are schematic drawings enclosed?
Yes
No
Provide demonstration of site control through an exclusive option to purchase the property on which the generation project is to be developed, a property deed, or a range of tax or corporate documents that identify property ownership. Site control must either be in the name of the party submitting the generation interconnection request or documentation must be provided establishing the business relationship between the project developer and the party having site control.