Planning

Generation Deactivation Zonal Cost Allocation for Reliability Must Run Generating Units

Generator zonal cost allocation is covered in part V, section 120 of the Open Access Transmission Tariff PDF.

The following list of FERC docket number(s) relating to reliability must-run rate schedules filed by generation owners are provided as informational only and may or may not include all such filings. Viewers interested in following these dockets are encouraged to eRegister on the FERC website.

Docket number ER17-750-000 - Dominion Virginia Power’s Deactivation Avoidable Cost Rate Informational Filing under Section 116 of the PJM Interconnection, L.L.C. Open Access Transmission Tariff for Yorktown generating units 1 and 2.

Docket No. ER17-1083-000:  RC Cape May Holdings, LLC filed with FERC a Cost of Service Recovery Rate under Section 119 of the PJM Interconnection, L.L.C. Open Access Transmission Tariff for BL England generating units 2 and 3.

Date
Zonal Cost Allocation for Retaining Yorktown 1 & 2 Generators PDF
6.26.2017
May 2017 Zonal Cost Allocation for Retaining BL England Generators 2 & 3 PDF  3.29.2017
2017/2018 Zonal Cost Allocation for Retaining BL England Generators 2 & 3 PDF  3.29.2017