Print Email
E-mail This Page

Please wait... loading

Queue Base Cases

Generation Interconnection Queues: ACTIVE

The files below are password protected.
Request access to the files Queue Base Case Information.

Queue X2 (Through 07.30.2011)
2015 Case and Contingencies files for X2 Queue (ZIP)
     
Queue X1 (Through 05.31.2011)
2015 Case and Contingencies files for X1 Queue (ZIP)
X1 Raw Cases (ZIP)
    
Queue W4 (Through 01.31.2011)
2014 Case and Contingencies files for W4 Queue (ZIP)
    
Queue W3 (Through 10.31.2010)
2014 Case and Contingencies Files for W3-001 thru W3-175 Analysis (ZIP)
             
Queue W2 (Through 07.31.2010)
2014 Case and Contingencies Files for W2-001 thru W2-050 Analysis (ZIP)
Queue W2 Project Geographic Map (PDF)
   
Queue W1 (Through 04.30.2010)
2014 Case and Contingencies Files (ZIP)
Queue W1 Project Geographic Map (PDF)
  
Queue V4 (Through 01.31.2010)
2014 Base Case and Contingency Files (ZIP)
Queue V4 Project Geographic Map (PDF)
 
Queue V3 (Through 10.31.2009)
2014 Base Case and Contingency Files (ZIP)
Queue V3 Project Geographic Map (ZIP)
 
Queue V2 (Through 07.31.2009)
2013 Base Case and Contingency Files (ZIP)
Queue V2 Project Geographic Map (ZIP)
 
Queue V1 (Through 04.30.2009)
2013 Base Case and Contingency Files (ZIP)
Queue V1 Project Geographic Map (ZIP)
 
Queue U4 (Through 01.31.2009)
2013 Base Case and Contingency Files (ZIP)
Queue U4 Project Geographic Map (PDF)
 
Queue U3 (Through 10.31.2008)
2012 Base Case and Contingency Files (ZIP)
Queue U3 Project Geographic Map (PDF)
 
Queue U2 (Through 07.31.2008)
2012 Base Case and Contingency Files (ZIP) 
Queue U2 Project Geographic Map (PDF)
 
Queue U1 (Through 04.30.2008)
2012 Base Case and Contingency Files (ZIP) 
Queue U1 Project Geographic Map (PDF)
 
Queue T (Through 01.31.2008)
2012 Base Case and Contingency Files (ZIP)
Queue T Projects Geographic Map (PDF)
 
Queue S (Through 07.31.2007)
2012 Base Case and Contingency Files (ZIP)
Queue S Projects Geographic Map (PDF)
 
Queue R (Through 01.31.2007)
2011 Base Case and Contingency Files (ZIP)
Queue R Projects Geographic Map (PDF)
 
Queue Q (Through 07.31.2006)
2011 Base Case and Contingency Files (ZIP)
Queue Q Short Circuit Basecase (ZIP)
Queue Q Projects Geographic Map (PDF)
 
Queue P (Through 01.31.2006)
2010 Base Case and Contingency Files (ZIP)
Queue P Short Circuit Basecase (ZIP)
Queue P Projects Geographic Map (PDF)
 
Queue O (Through 07.31.2005)
2009 Base Case and Contingency Files (ZIP)
Queue O Short Circuit Basecase (ZIP)
Queue O Projects Geographic Map (PDF)
 
Queue N (Through 01.31.2005)
 
Queue M (Through 07.31.2004)
 
Queue L (Through 01.31.2004)
Queue L Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
DPL Zone Directional Relay Limits (XLS)
 
Queue K (Through 07.31.2003)
Queue K Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
Queue K Short Circuit Basecase (ZIP)
DPL Zone Directional Relay Limits (XLS)
C* - Capacity request for previously queued wind projects
 
Queue J (Through 01.31.2003)
Queue J Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
Queue J Short Circuit Basecase (ZIP)
DPL Zone Directional Relay Limits (XLS)
 
Queue I (Through 07.31.2002)
Queue I Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
DPL Zone Directional Relay Limits (XLS)


Queue H (Through 01.31.2002)
Queue H Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
DPL Zone Directional Relay Limits (XLS)
 
Queue G (Through 07.31.2001)
Queue G Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
* This is one generating project being evaluated for two connections at the Feasibility Study stage. A decision as to connection will be made prior to the Impact Study.
** Only 1 of these two projects will be built.
 
Queue F (Through 01.31.2000)
Queue F Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
Queue D Impact Study - Short Circuit Basecase - PSS/E v26 RAW Format (ZIP)
Queue D Impact Study - Short Circuit Basecase - PSS/E v26 SAV Format (ZIP)
 
Queue E (Prior to 11.30.2000)
Queue E Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
Queue D Impact Study - Short Circuit Basecase - PSS/E v26 RAW Format (ZIP)
Queue D Impact Study - Short Circuit Basecase - PSS/E v26 SAV Format (ZIP)
 
Queue D (Prior to 07.31.2000)
Queue D Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
Queue D Impact Study - Short Circuit Basecase - PSS/E v26 RAW Format (ZIP)
Queue D Impact Study - Short Circuit Basecase - PSS/E v26 SAV Format (ZIP)
* Using Hazleton Unit #1 & 2 Capacity Interconnection Rights
** Use existing Kearny #12 Capacity Interconnection Rights
*** Use existing Hay Road #4 Capacity Interconnection Rights


Queue C (Through 03.31.2000)
Queue C Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
* using Linden #1 & #2 & #3 Capacity Injection Rights
** Alternate site for project B42. Only one project will be built.
*** Alternate connection point for project C3. Only one project will be built.
 
Queue B (Through 11.30.1999)
Queue B Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)
** One project is having two interconnection points evaluated.
*** using Burlington #7 Capacity Interconnection Rights
 
Queue A (Prior to 04.15.1999)
Queue A Feasibility Study - Power Flow Basecase and Contingency Files (ZIP)

Generation Interconnection Queues: WITHDRAWN

Queue D (Through 07.31.2000)
* Using Hazleton Unit #1 & 2 Capacity Interconnection Rights
** Use existing Kearny #12 Capacity Interconnection Rights
*** Use existing Hay Road #4 Capacity Interconnection Rights

Queue C (Through 03.31.2000)
* using Linden #1 & #2 & #3 Capacity Injection Rights
** Alternate site for project B42. Only one project will be built.
*** Alternate connection point for project C3. Only one project will be built

Queue B (Through 11.30.1999)
** One project is having two interconnection points evaluated.
*** using Burlington #7 Capacity Interconnection Rights

Queue A (Prior to 04.15.1999) 
Northern New Jersey Series PARs (PDF)