AF1-124 Phase II Study Report

v1.00 released 2024-12-18 13:30

Oceana 230 kV

254.1 MW Capacity / 836.0 MW Energy

Introduction

This Phase II System Impact Study Report (PH2) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 310 for New Service Requests (projects) in Transition Cycle #1. The Project Developer/Eligible Customer (developer) is Virginia Electric and Power Company, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Virginia Electric and Power Company.

Preface

The Phase II System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase II System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.5, PJM takes the following actions during the Phase II System Impact Study:
  1. PJM will retool load flow results from Phase I System Impact Study (summer peak, winter peak[1] and light load) based on decisions made by Project Developers or Eligible Customers during Decision Point I.
  2. PJM will conduct any required voltage analyses.
  3. PJM will perform short circuit and stability analyses as required.
  4. PJM will coordinate with the Affected System to confirm which projects in PJM Cycle will require Affected System studies. If the Affected System Operator indicates that an Affected System study is required, PJM will:
    1. Notify the Project Developer or Eligible Customer of the need for an Affected System study and the requirement to execute an Affected System study agreement with the impacted Affected System Operator, and;
    2. Include the results of the Affected System Operator’s Affected System Study in the Phase II System Impact Study results, if applicable and available
  5. The Phase II System Impact Study Results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase II System Impact Study:
  1. Verify Interconnection Facilities and Network Upgrades required to accommodate the New Service Request.
  2. Perform a Facilities Study. The Facilities Study in Phase II System Impact Study phase will be for the physical Interconnection Facilities. The Facilities Study requirements are outlined in Attachment C of PJM Manual 14H. The study will be conducted pursuant to Tariff, Part VII, Subpart D, section 307(A)(7).

Decision Point II Requirements

At the close of Phase II System Impact Study, PJM will initiate Decision Point II (DP2). During DP2, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.A. Additional information on these elements is available in PJM Manual 14H sections 4.6, 6, and 7.

Allowable project modifications at Decision Point II are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

Adverse Test Eligibility

This New Service Request does not meet the Adverse Study Impact Criteria and has the option to either move forward in the Cycle process or withdraw at DP2 with Readiness Deposit #1 forfeited. See adverse study impact calculation below.

This section details whether a Project Developer or Eligible Customer qualifies for the Adverse Study Impact clause outlined in the PJM OATT, Part VII, Subpart D, section 311.B and Manual 14H, section 6.2.2. In order to qualify for an Adverse Study Impact at Decision Point II, the Network Upgrade cost from Phase I to Phase II must:

  1. Increase overall by 25% or more
  2. Increases by more than $10,000 per MW (Includes Costs identified in Affected System studies)

If a New Service Request meets the criteria above and chooses to withdraw the request, PJM will refund the cumulative Readiness Deposit amounts paid at the Application Phase and at Decision Point I (RD1 and RD2, respectively).

The below calculations show the computation of this New Service Request's Adverse Study Impact

DP2 Adverse Eligibility = DP2 Adverse Cost Alloc DP1 Adverse Cost Alloc > 1.25 AND ( DP2 Adverse Cost Alloc - DP1 Adverse Cost Alloc ) Project Size > $10,000 per MW
DP2 Adverse Eligibility = $571,852,604 $555,805,184 = 1.03 AND ( $571,852,604 - $555,805,184 ) 836.0 = $19,195 per MW

General

The Project Developer has proposed a Offshore Wind generating facility located in the Virginia Electric and Power Company zone — City of Chesapeake County, Virginia. The installed facilities will have a total capability of 836.0 MW with 254.1 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number AF1-124
Project Name Oceana 230 kV
Project Developer Name Virginia Electric and Power Company
State Virginia
County City of Chesapeake
Transmission Owner Virginia Electric and Power Company
MFO 836.0 MW
MWE 836.0 MW
MWC 254.1 MW
Fuel Type Offshore Wind
Basecase Study Year 2027

Physical Interconnection Facility Study

Received

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AF1-123, AF1-124 and AF1-125 will interconnect on the Dominion transmission system at the Harpers (Oceana) 230 kV Substation.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In Phase II SIS, the interconnected Transmission Owner has performed a facilities study for both the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades. The System Reliability Network Upgrade shown in the table are planning level cost estimates which are subject to change as a result of a facility study performed by the TO during Phase III System Impact Study.

Based on the Phase II SIS results, the AF1-124 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit #3 are also shown below.

Cost Summary
Description Cost Allocated to AF1-124 Cost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF) $7,308,561 $0
Other Scope $0 $0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades $98,140,632 $98,140,632
Network Upgrades $148,258,344 $148,258,344
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL) $275,602,659 $275,602,659
Transient Stability $49,340,458 $49,340,458
Short Circuit $510,511 $510,511
Transmission Owner Analysis
SubRegional $0 $0
Distribution $0 $0
Affected System Study Reinforcements $0 $0
Total $579,161,165 $571,852,604

* Contributes to calculation for Readiness Deposit #3 (RD3). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Note 4: Please see the ‘Affected Systems Studies’ section of this Phase 2 SIS report for details on your project’s need for an Affected Systems Study. If your project requires an Affected Systems Study, the Affected Systems impacts may not be available from the Affected System Operator at the time of the PJM Phase II SIS. Therefore, the cost in this section would not reflect any required upgrades by the Affected System until the study is completed. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 311 (Decision Point II) A.1.b and PJM Manual 14H, section 6.2, Readiness Deposit #3 (RD3) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point II (DP2), the Project Developer or Eligible Customer is required to submit Readiness Deposit #3, which is calculated as 20% of cost allocation for required Phase II Network Upgrades minus Readiness Deposit #1 & Readiness Deposit #2.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Note 4: Readiness Deposit #3 can be zero, but may not be a negative number.

Readiness Deposit #3 Due for Project AF1-124

Readiness Deposit #3 has been calculated for the AF1-124 project based on the Phase II System Impact Study results and is shown in the table below. This Readiness Deposit #3 must be provided at Decision Point II through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID 20% of cost allocation for Phase II Network Upgrades Sum of Readiness Deposit #1 & Readiness Deposit #2 Received (RD1+RD2) Readiness Deposit #3 (RD3) for AF1-124 Project due at DP2
A B A - B
AF1-124 $114,370,521 $48,164,197 $66,206,324

Note: Failure to provide an acceptable form of Readiness Deposit #3 by the end of Decision Point II will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

The New Service Request Project will interconnect with the Dominion transmission system via a new Harpers switching station that connects at Fentress 230/500 kV substation. The required work for the interconnection of the New Service Request Project to the Dominion Transmission System is detailed in the following tables.

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Build Option
Network Upgrades
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
n8317.1

Expand Fentress 500 kV and 230 kV substations to terminate three new 230 kV lines from Harpers Road substation and connect them to Fentress 500 kV

$32,089,434 $188,729,124 $3,121,660 $2,604,178 $226,544,396 $75,514,799 (See Note 1)
n8317.2

Construct three (3) overhead 230kV transmission lines that will start at the existing Fentress Substation and terminate at the new Harpers Road Substation, located approximately 14.3 miles away

$83,591,823 $116,537,866 $6,666,499 $11,434,449 $218,230,637 $72,743,546 (See Note 1)
Stand-Alone Network Upgrades
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
n8317.3

Build new 230 kV Harpers Road switching station to terminate nine offshore wind export cables for AF1-123/124/125 and consolidate to three overhead 230 kV transmission lines to go to Fentress Substation

$54,931,535 $211,895,213 $9,823,673 $17,771,475 $294,421,896 $98,140,632 (See Note 1)
Transmission Owner Interconnection Facilities
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
(Pending)

Transmission Owner Interconnection Facilities

$1,493,879 $18,556,359 $317,295 $1,558,150 $21,925,683 $7,308,561 (See Note 1)
Developer Build Option

Project Developer has the option ("Option to Build") to assume responsibility for the design, procurement and construction of Transmission Owner Interconnection Facilities and/or Stand-Alone Network Upgrades.

If Option to Build is elected, the Project Developer must fulfill additional requirements in accordance to PJM Manual 14C, section 5.1 and PJM Manual 14H, section 8.6.2.

The cost estimates for eligible facilities and Option to Build oversight are highlighted below:

(No Developer Build Option for this project.)

Build Option Price Comparison
Build Option Total Cost Allocated Cost
Transmission Owner Build Option $761,122,612 $253,707,537
Developer Build Option (No Developer Build Option)

Based on the scope of work for the Interconnection Facilities, it is expected to take 10 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.

Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.

It is estimated to take 10 months to complete this work upon execution of the Generator Interconnection Agreement (GIA).This estimated time to complete is dependent on major equipment lead times. These preliminary cost estimates are based on typical engineering costs. A more detailed engineering cost estimates are normally done when the Project Developer provides an exact site plan location for the generation substation during a future study phase.  As shown in the one line diagram, this Interconnection Request is sharing the Point of Interconnection (POI) and Interconnection Facilities with one or more other Interconnection Requests. Should other requests withdraw from Transition Cycle 1, the cost allocation for Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and applicable Network Upgrades identified in the study report will be updated for the remaining project(s). Refer to the one line for other Interconnection Requests at this POI. 


Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.
 
Remote Terminal Work: During Phase 2 of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Transmission Owner Analysis

PJM performed a power flow analysis of the transmission system using a 2027 load flow model and the results were verified by Dominion.

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. Dominion interconnection requirements can be found here. Refer to AF1-124 Physical Interconnection Facilities Study for additional requirements found in the General Section of the report.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The wind generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Wind speed (meters/second) - (Required)
  • Wind direction (decimal degrees from true north) - (Required)
  • Ambient air temperature (Fahrenheit) - (Required)
  • Air Pressure (Hectopascals) - (Required)
  • Humidity (Percent) (Accepted, not required)
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards and in the Physical Interconnection Facilities Study.

Summer Peak Analysis

The New Service Request was evaluated as a 836.0 MW (254.1 MW Capacity) injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential summer peak period network impacts were as follows:

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

Summer Peak Analysis
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
314218 to 314908 ckt 1
DVP_P4-2: H2T557_SRT-S
CONTINGENCY 'DVP_P4-2: H2T557_SRT-S'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Breaker AC 127.4 1065.0 C 1356.77 109.53

Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H2T557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
314218 to 314908 ckt 1
DVP_P4-2: H2T557_SRT-S
CONTINGENCY 'DVP_P4-2: H2T557_SRT-S'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Breaker AC 127.4 1065.0 C 1356.77 109.53
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
314218 to 314908 ckt 1
DVP_P4-2: H2T557_SRT-S
CONTINGENCY 'DVP_P4-2: H2T557_SRT-S'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Breaker AC 174.37 1065.0 C 1856.99 139.5
Topology Case Flowgate Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H2T557_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
964801 AG1-343 C Adder 3.9 MW 3.31 MW
964802 AG1-343 E Adder 3.06 MW 2.6 MW
965291 AG1-394 C Adder 0.56 MW 0.47 MW
965292 AG1-394 E Adder 1.03 MW 0.87 MW
314541 3WATKINS Adder 0.48 MW 0.4 MW
920042 AA2-088 E OP Adder 6.99 MW 5.94 MW
934521 AD1-076 C Adder 8.12 MW 6.9 MW
934522 AD1-076 E Adder 4.14 MW 3.52 MW
940492 AE2-034 E Adder 2.09 MW 1.78 MW
314539 3UNCAMP Adder 4.26 MW 3.62 MW
916042 Z1-036 E Adder 20.24 MW 17.2 MW
938771 AE1-103 C Adder 2.08 MW 1.76 MW
938772 AE1-103 E Adder 2.87 MW 2.44 MW
314229 6MT RD221 50/50 0.19 MW 0.19 MW
314236 6NRTHEST 50/50 0.24 MW 0.24 MW
314331 6POE Adder 1.21 MW 1.03 MW
314507 3THOMPSN Adder 1.52 MW 1.29 MW
314525 6KINGFORK Adder 0.78 MW 0.67 MW
314550 6HICKORY Adder 1.6 MW 1.36 MW
315050 1FOURRIVERG 50/50 6.28 MW 6.28 MW
315060 1CHESTF5 Adder 72.1 MW 61.29 MW
315065 1CHESTF6 Adder 21.87 MW 18.59 MW
315067 1DARBY 1 50/50 3.2 MW 3.2 MW
315068 1DARBY 2 50/50 3.21 MW 3.21 MW
315069 1DARBY 3 50/50 3.22 MW 3.22 MW
315070 1DARBY 4 50/50 3.22 MW 3.22 MW
315073 1STONECA Adder 7.36 MW 6.25 MW
315083 1SPRUNCA Adder 10.52 MW 8.95 MW
315084 1SPRUNCB Adder 10.52 MW 8.95 MW
315092 1YORKTN3 Adder 122.81 MW 104.39 MW
925865 AC1-065 E Adder 16.53 MW 14.05 MW
926412 AC1-112 E 50/50 1.61 MW 1.61 MW
926472 AC1-118 E Adder 0.91 MW 0.78 MW
926662 AC1-147 E Adder 0.99 MW 0.84 MW
926755 AC1-161 E Adder 9.36 MW 7.95 MW
927226 AC1-216 E Adder 7.46 MW 6.34 MW
934392 AD1-063 E Adder 1.06 MW 0.9 MW
934781 AD1-105 C 50/50 1.54 MW 1.54 MW
934782 AD1-105 E 50/50 6.87 MW 6.87 MW
935112 AD1-144 E Adder 0.73 MW 0.62 MW
936582 AD2-073 E Adder 0.96 MW 0.82 MW
936591 AD2-074 C Adder 5.32 MW 4.52 MW
936592 AD2-074 E Adder 8.68 MW 7.38 MW
942152 AE2-227 E Adder 1.77 MW 1.51 MW
942162 AE2-228 E Adder 1.56 MW 1.32 MW
942341 AE2-247 C Adder 1.18 MW 1.01 MW
942342 AE2-247 E Adder 1.63 MW 1.39 MW
943461 AF1-017 C Adder 1.07 MW 0.91 MW
943462 AF1-017 E Adder 1.75 MW 1.49 MW
943612 AF1-032 E Adder 0.68 MW 0.58 MW
943741 AF1-042 C Adder 2.78 MW 2.37 MW
943742 AF1-042 E Adder 4.54 MW 3.86 MW
944871 AF1-152 C Adder 3.8 MW 3.23 MW
944872 AF1-152 E Adder 2.53 MW 2.15 MW
958502 AF2-144 E Adder 0.76 MW 0.65 MW
960091 AF2-300 C Adder 1.68 MW 1.43 MW
960092 AF2-300 E Adder 1.12 MW 0.95 MW
961951 AG1-038 C Adder 3.08 MW 2.62 MW
961952 AG1-038 E Adder 4.25 MW 3.61 MW
966661 AG1-536 C Adder 5.12 MW 4.35 MW
966662 AG1-536 E Adder 6.88 MW 5.85 MW
966871 AG1-558 C 50/50 3.88 MW 3.88 MW
966872 AG1-558 E 50/50 1.96 MW 1.96 MW
966881 AG1-559 C Adder 1.86 MW 1.58 MW
966882 AG1-559 E Adder 0.94 MW 0.8 MW
315260 1GOSPORTA Adder 1.6 MW 1.36 MW
315261 1GOSPORTB Adder 2.04 MW 1.74 MW
315262 1GOSPORTC Adder 1.73 MW 1.47 MW
316076 AC2-137 E Adder 1.59 MW 1.35 MW
316078 AC2-138 E Adder 0.87 MW 0.74 MW
316157 AD2-030 E Adder 1.15 MW 0.98 MW
913392 Y1-086 E Adder 1.59 MW 1.35 MW
916192 Z1-068 E Adder 1.4 MW 1.19 MW
923832 AB2-022 E Adder 0.9 MW 0.76 MW
923842 AB2-024 E Adder 1.8 MW 1.53 MW
923852 AB2-025 E Adder 0.79 MW 0.67 MW
923862 AB2-026 E Adder 0.78 MW 0.66 MW
930122 AB1-027 E 50/50 1.98 MW 1.98 MW
938552 AE1-074 E Adder 1.25 MW 1.06 MW
938562 AE1-075 E Adder 0.66 MW 0.56 MW
939312 AE1-162 E Adder 1.19 MW 1.01 MW
946262 AF1-291 E Adder 1.57 MW 1.33 MW
957411 AF2-035 C Adder 6.71 MW 5.7 MW
957412 AF2-035 E Adder 3.36 MW 2.85 MW
957492 AF2-043 E Adder 1.05 MW 0.89 MW
957601 AF2-054 C Adder 2.05 MW 1.74 MW
957602 AF2-054 E Adder 1.37 MW 1.16 MW
962861 AG1-135 C Adder 5.79 MW 4.92 MW
962862 AG1-135 E Adder 3.86 MW 3.28 MW
962962 AG1-145 E Adder 1.36 MW 1.16 MW
962971 AG1-146 C Adder 2.96 MW 2.52 MW
962972 AG1-146 E Adder 1.97 MW 1.68 MW
962981 AG1-147 C Adder 6.91 MW 5.87 MW
962982 AG1-147 E Adder 4.6 MW 3.91 MW
963611 AG1-210 C Adder 0.62 MW 0.53 MW
963612 AG1-210 E Adder 0.93 MW 0.79 MW
964211 AG1-282 C Adder 1.91 MW 1.63 MW
964212 AG1-282 E Adder 1.28 MW 1.08 MW
901082 W1-029 E Adder 22.94 MW 19.5 MW
917122 Z2-027 E Adder 0.97 MW 0.82 MW
925332 AB2-190 E Adder 8.12 MW 6.9 MW
925522 AC1-027 E Adder 0.9 MW 0.77 MW
941501 AE2-147 C Adder 11.4 MW 9.69 MW
941502 AE2-147 E Adder 7.6 MW 6.46 MW
942001 AE2-212 C Adder 2.18 MW 1.85 MW
942002 AE2-212 E Adder 1.46 MW 1.24 MW
957832 AF2-077 E Adder 1.31 MW 1.11 MW
957871 AF2-081 C Adder 7.31 MW 6.21 MW
957872 AF2-081 E Adder 3.13 MW 2.66 MW
958161 AF2-110 C Adder 1.02 MW 0.87 MW
958162 AF2-110 E Adder 1.63 MW 1.38 MW
313811 6ELKO L286 Adder 1.66 MW 1.41 MW
314181 3NORNECK Adder 0.83 MW 0.7 MW
933291 AC2-141 C Adder 21.92 MW 18.63 MW
933292 AC2-141 E Adder 9.36 MW 7.95 MW
934011 AD1-025 C Adder 16.31 MW 13.87 MW
934012 AD1-025 E Adder 9.66 MW 8.21 MW
927041 AC1-191 C 50/50 15.58 MW 15.58 MW
927042 AC1-191 E 50/50 7.76 MW 7.76 MW
933981 AD1-022 C Adder 5.76 MW 4.9 MW
933982 AD1-022 E Adder 3.14 MW 2.67 MW
313053 6PAPERMILL Adder 6.65 MW 5.65 MW
314594 6PLYMOUTH TP Adder 0.22 MW 0.18 MW
314632 6AYDLETT TAP Adder 0.99 MW 0.84 MW
316004 AC1-112 C 50/50 0.44 MW 0.44 MW
316160 AE1-175 E Adder 1.12 MW 0.96 MW
316233 AE1-074 C Adder 2.47 MW 2.1 MW
316240 AF1-291 C Adder 2.35 MW 2.0 MW
316301 AE2-228 C Adder 2.34 MW 1.99 MW
316304 AE2-227 C Adder 2.66 MW 2.26 MW
316312 AB1-027 C 50/50 0.7 MW 0.7 MW
924516 AB2-100 E1 Adder 1.84 MW 1.56 MW
924517 AB2-100 E2 Adder 1.84 MW 1.56 MW
926785 AC1-164_E Adder 19.82 MW 16.85 MW
934065 AD1-033 E Adder 3.7 MW 3.14 MW
937226 AE2-253 E Adder 4.28 MW 3.64 MW
939612 AE1-191 E Adder 5.59 MW 4.75 MW
963221 AG1-171 C Adder 2.08 MW 1.77 MW
963222 AG1-171 E Adder 1.39 MW 1.18 MW
963231 AG1-172 C Adder 2.08 MW 1.77 MW
963232 AG1-172 E Adder 1.39 MW 1.18 MW
963241 AG1-173 C Adder 2.08 MW 1.77 MW
963242 AG1-173 E Adder 1.39 MW 1.18 MW
315051 AA1-145 CT1 50/50 6.47 MW 6.47 MW
315052 AA1-145 CT2 50/50 6.47 MW 6.47 MW
316427 AG1-213 C Adder 0.56 MW 0.47 MW
939246 AE1-155 E Adder 8.29 MW 7.05 MW
315043 1FOUR RIVERA 50/50 4.06 MW 4.06 MW
315044 1FOUR RIVERB 50/50 4.06 MW 4.06 MW
315045 1FOUR RIVERC 50/50 4.96 MW 4.96 MW
315046 1FOUR RIVERD 50/50 4.0 MW 4.0 MW
315047 1FOUR RIVERE 50/50 4.0 MW 4.0 MW
315048 1FOUR RIVERF 50/50 4.89 MW 4.89 MW
919153 AA1-139 E2 Adder 2.99 MW 2.54 MW
919152 AA1-139 E1 Adder 2.99 MW 2.54 MW
920692 AA2-178 E Adder 2.79 MW 2.37 MW
924814 AB2-134 E Adder 12.23 MW 10.39 MW
316084 AB2-161 E Adder 4.77 MW 4.05 MW
932046 AC2-012 E Adder 9.84 MW 8.36 MW
316311 AC2-079 C Adder 4.52 MW 3.84 MW
932596 AC2-079 E Adder 7.37 MW 6.26 MW
934146 AD1-041 E Adder 3.5 MW 2.97 MW
934576 AD1-082 E Adder 3.8 MW 3.23 MW
316349 AD2-085 C Adder 2.73 MW 2.32 MW
936666 AD2-085 E Adder 4.46 MW 3.79 MW
961611 AG1-000B C Adder 14.43 MW 12.26 MW
941591 AE2-156 C Adder 13.43 MW 11.41 MW
942371 AE2-250 C Adder 10.04 MW 8.54 MW
942372 AE2-250 E Adder 5.3 MW 4.5 MW
944581 AF1-123 C Adder 33.17 MW 28.2 MW
944582 AF1-123 E Adder 75.97 MW 64.57 MW
944591 AF1-124 C Adder 33.29 MW 28.3 MW
944592 AF1-124 E Adder 76.24 MW 64.81 MW
944601 AF1-125 C Adder 32.66 MW 27.76 MW
944602 AF1-125 E Adder 74.77 MW 63.56 MW
944631 AF1-128 C Adder 45.12 MW 38.35 MW
958261 AF2-120 C Adder 5.96 MW 5.06 MW
958262 AF2-120 E Adder 3.97 MW 3.37 MW
962271 AG1-075 C Adder 17.33 MW 14.73 MW
962272 AG1-075 E Adder 10.56 MW 8.98 MW
965281 AG1-393 C Adder 2.23 MW 1.9 MW
965282 AG1-393 E Adder 1.49 MW 1.26 MW
965691 AG1-437 C Adder 6.4 MW 5.44 MW
965701 AG1-438 C Adder 6.62 MW 5.63 MW
934501 AD1-074 C Adder 22.36 MW 19.01 MW
934502 AD1-074 E Adder 11.38 MW 9.68 MW
934511 AD1-075 C Adder 5.59 MW 4.75 MW
934512 AD1-075 E Adder 2.85 MW 2.42 MW
935161 AD1-151 C Adder 15.94 MW 13.54 MW
935162 AD1-151 E Adder 10.62 MW 9.03 MW
938531 AE1-072 C Adder 12.83 MW 10.9 MW
938532 AE1-072 E Adder 6.69 MW 5.68 MW
939191 AE1-149 C Adder 9.76 MW 8.3 MW
939192 AE1-149 E Adder 6.51 MW 5.53 MW
939602 AE1-190 E Adder 1.4 MW 1.19 MW
940431 AE2-027 C Adder 13.65 MW 11.6 MW
940432 AE2-027 E Adder 9.1 MW 7.73 MW
940481 AE2-033 C Adder 10.88 MW 9.24 MW
940482 AE2-033 E Adder 7.33 MW 6.23 MW
940541 AE2-040 C Adder 1.94 MW 1.65 MW
940551 AE2-041 C Adder 7.08 MW 6.02 MW
941101 AE2-104 C Adder 2.51 MW 2.13 MW
941102 AE2-104 E Adder 3.99 MW 3.39 MW
941281 AE2-122 C Adder 21.12 MW 17.95 MW
941282 AE2-122 E Adder 85.21 MW 72.43 MW
942191 AE2-231 C Adder 3.69 MW 3.14 MW
942192 AE2-231 E Adder 2.46 MW 2.09 MW
943471 AF1-018 C Adder 7.08 MW 6.02 MW
944641 AF1-129 C Adder 114.08 MW 96.97 MW
963622 AG1-213 E Adder 0.66 MW 0.56 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 3.58 MW 3.58 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 35.83 MW 35.83 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.52 MW 1.52 MW
NY PJM->LTFIMP_NY CLTF 0.77 MW 0.77 MW
CPLE LTFEXP_CPLE->PJM CLTF 4.82 MW 4.82 MW
TVA LTFEXP_TVA->PJM CLTF 1.32 MW 1.32 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.07 MW 0.07 MW
MEC LTFEXP_MEC->PJM CLTF 0.19 MW 0.19 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.19 MW 0.19 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.75 MW 1.75 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 9.72 MW 9.72 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.29 MW 2.29 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Summer Peak Analysis - Eliminated Flowgates
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P4-2: 568T575_SRT-A
CONTINGENCY 'DVP_P4-2: 568T575_SRT-A'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 115.64 3940.0 C 4556.09 142.23
DVP 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 105.86 3220.44 B 3409.14 39.99
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 130.64 3220.44 B 4207.12 49.69
DVP 8OX-8CLIFTON 500.0 kV Ckt 1 line
314919 to 314904 ckt 1
DVP_P1-2: LN 569_SRT-S
CONTINGENCY 'DVP_P1-2: LN 569_SRT-S'
 OPEN BRANCH FROM BUS 314913 TO BUS 314916 CKT 1                /*8LOUDOUN     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Single AC 101.58 2686.52 B 2728.9 27.54
DVP 8BRISTER-8OX 500.0 kV Ckt 1 line
314900 to 314919 ckt 1
DVP_P4-2: 541T569_SRT-S
CONTINGENCY 'DVP_P4-2: 541T569_SRT-S'
 OPEN BRANCH FROM BUS 314913 TO BUS 314916 CKT 1   /*8LOUDOUN     500.0 - 8MORRSVL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314929 CKT 1   /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Breaker AC 102.37 3940.0 C 4033.4 120.57
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 126.76 3220.44 B 4082.33 51.55
DVP 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
DVP_P4-2: 545T552_SRT-S
CONTINGENCY 'DVP_P4-2: 545T552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314916 CKT 1                /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314934 CKT 1 /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314934 CKT 1 /*8MORRSVL     500.0 - 8SPOTSYL     500.0
END
Breaker AC 109.79 3940.0 C 4325.61 136.95
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Breaker AC 126.3 3940.0 C 4976.42 247.29
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P4-2: 57602_SRT-S
CONTINGENCY 'DVP_P4-2: 57602_SRT-S'
 OPEN BRANCH FROM BUS 314232 TO BUS 314918 CKT 1                /*6NO ANNA     230.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314918 TO BUS 314934 CKT 1 /*8NO ANNA     500.0 - 8SPOTSYL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314918 TO BUS 314934 CKT 1 /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Breaker AC 113.73 5011.0 C 5699.19 266.43
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 122.75 4070.2 B 4996.17 81.01
DVP 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 112.19 1058.16 B 1187.18 19.2
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Single AC 130.95 3220.44 B 4217.23 50.47
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P4-2: H1T594_SRT-S
CONTINGENCY 'DVP_P4-2: H1T594_SRT-S'
 OPEN BRANCH FROM BUS 314063 TO BUS 314916 CKT 1                /*6MORRSVL     230.0 - 8MORRSVL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 OPEN BUS 314897                                                /*8MORRS_1     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Breaker AC 113.7 3940.0 C 4479.66 105.97
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P1-2: LN 594_SRT-S
CONTINGENCY 'DVP_P1-2: LN 594_SRT-S'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Single AC 119.79 3220.44 B 3857.63 32.12
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 106.97 3220.44 B 3444.92 65.87
DVP 8CARSON-6CARSON 500.0/230.0 kV Ckt 2 transformer
314902 to 314282 ckt 2
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 132.78 1056.8 C 1403.21 59.16
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P4-2: H2T574_SRT-S
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 123.28 3940.0 C 4857.22 230.97
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P1-2: LN 575_SRT-S
CONTINGENCY 'DVP_P1-2: LN 575_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1                /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Single AC 128.15 3220.44 B 4127.12 41.06
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Single AC 104.94 3220.44 B 3379.63 66.47
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P4-2: SPOTS H1T594_SRT-S
CONTINGENCY 'DVP_P4-2: SPOTS H1T594_SRT-S'
 OPEN BRANCH FROM BUS 314755 TO BUS 314934 CKT 1                /*3SPOTSYL     115.0 - 8SPOTSYL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Breaker AC 116.8 3940.0 C 4602.03 111.73
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: 563T576_SRT-S
CONTINGENCY 'DVP_P4-2: 563T576_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 111.33 3144.0 C 3500.17 251.96
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P4-2: H1T575_SRT-S
CONTINGENCY 'DVP_P4-2: H1T575_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 1                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1                /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 115.3 3940.0 C 4542.79 131.87
DVP 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Single AC 104.85 3220.44 B 3376.72 39.87
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 108.51 4070.2 B 4416.63 70.09
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P1-2: LN 573_SRT-A
CONTINGENCY 'DVP_P1-2: LN 573_SRT-A'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Single AC 122.44 3220.44 B 3943.26 34.2
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 102.87 2442.12 B 2512.29 75.3
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Single AC 130.89 3220.44 B 4215.14 69.45
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Single AC 113.49 3220.44 B 3654.86 62.69
DVP 8OX-8CLIFTON 500.0 kV Ckt 1 line
314919 to 314904 ckt 1
DVP_P7-1: LN 2101-569_SRT-S
CONTINGENCY 'DVP_P7-1: LN 2101-569_SRT-S'
 OPEN BRANCH FROM BUS 313712 TO BUS 313716 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL DP  230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314119 CKT 1                /*6VINTHIL TP  230.0 - 6NOKESVL     230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314125 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL     230.0
 OPEN BRANCH FROM BUS 314119 TO BUS 314130 CKT 1                /*6NOKESVL     230.0 - 6BRISTER     230.0
 OPEN BRANCH FROM BUS 314913 TO BUS 314916 CKT 1                /*8LOUDOUN     500.0 - 8MORRSVL     500.0
 OPEN BUS 313712                                                /*6VINTHIL TP  230.0
 OPEN BUS 313716                                                /*6VINTHIL DP  230.0
 OPEN BUS 314119                                                /*6NOKESVL     230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Tower AC 106.47 3144.0 C 3347.47 97.92
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 111.53 3144.0 C 3506.36 251.24
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P4-2: H2T574_SRT-S
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 115.19 3940.0 C 4538.63 207.65
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P4-2: 568T575_SRT-A
CONTINGENCY 'DVP_P4-2: 568T575_SRT-A'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 121.21 3940.0 C 4775.7 139.95
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Breaker AC 119.69 3940.0 C 4715.74 233.33
DVP 6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer
314214 to 314903 ckt 1
DVP_P4-2: H4T567_SRT-A
CONTINGENCY 'DVP_P4-2: H4T567_SRT-A'
 OPEN BRANCH FROM BUS 314214 TO BUS 314903 CKT 2   /*6CHCKAHM     230.0 - 8CHCKAHM     500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Breaker AC 115.67 1107.1 C 1280.58 91.35
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 155.32 663.64 B 1030.78 15.16

Details for 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P4-2: 568T575_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P4-2: 568T575_SRT-A
CONTINGENCY 'DVP_P4-2: 568T575_SRT-A'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 115.64 3940.0 C 4556.09 142.23
Elimination
Base Case Details for Eliminated Flowgate 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P4-2: 568T575_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 5.93 MW 5.93 MW
963042 AG1-153 E 50/50 8.9 MW 8.9 MW
964801 AG1-343 C Adder 5.64 MW 4.8 MW
964802 AG1-343 E Adder 4.43 MW 3.77 MW
966811 AG1-552 C Adder 1.95 MW 1.65 MW
966812 AG1-552 E Adder 0.92 MW 0.79 MW
965291 AG1-394 C Adder 0.81 MW 0.69 MW
965292 AG1-394 E Adder 1.48 MW 1.26 MW
966621 AG1-532 C Adder 1.34 MW 1.14 MW
966622 AG1-532 E Adder 0.9 MW 0.76 MW
314541 3WATKINS Adder 0.65 MW 0.56 MW
314572 3EMPORIA Adder 0.41 MW 0.35 MW
918492 AA1-063AE OP Adder 3.86 MW 3.28 MW
920042 AA2-088 E OP Adder 10.02 MW 8.52 MW
942931 AE2-313 C 50/50 38.47 MW 38.47 MW
942932 AE2-313 E 50/50 25.65 MW 25.65 MW
944011 AF1-069 C 50/50 13.95 MW 13.95 MW
944012 AF1-069 E 50/50 5.42 MW 5.42 MW
960081 AF2-299 C Adder 1.94 MW 1.65 MW
960082 AF2-299 E Adder 1.29 MW 1.1 MW
900672 V4-068 E Adder 0.34 MW 0.29 MW
923263 AB1-132 E OP Adder 5.8 MW 4.93 MW
923573 AB1-173 E OP Adder 3.13 MW 2.66 MW
940492 AE2-034 E Adder 2.9 MW 2.46 MW
941031 AE2-094 C 50/50 42.69 MW 42.69 MW
941032 AE2-094 E 50/50 19.12 MW 19.12 MW
946281 AF1-292 C Adder 1.48 MW 1.26 MW
946282 AF1-292 E Adder 0.99 MW 0.84 MW
957481 AF2-042 C Adder 55.02 MW 46.76 MW
957482 AF2-042 E Adder 36.68 MW 31.18 MW
957521 AF2-046 C Adder 14.87 MW 12.64 MW
957522 AF2-046 E Adder 7.52 MW 6.39 MW
314539 3UNCAMP Adder 5.74 MW 4.88 MW
916042 Z1-036 E Adder 27.01 MW 22.96 MW
938771 AE1-103 C Adder 2.76 MW 2.35 MW
938772 AE1-103 E Adder 3.82 MW 3.24 MW
933502 AC2-165 E Adder 7.58 MW 6.44 MW
314331 6POE Adder 1.3 MW 1.11 MW
314507 3THOMPSN Adder 1.9 MW 1.61 MW
314525 6KINGFORK Adder 0.94 MW 0.8 MW
314550 6HICKORY Adder 2.06 MW 1.75 MW
315083 1SPRUNCA Adder 8.17 MW 6.95 MW
315084 1SPRUNCB Adder 8.17 MW 6.95 MW
926662 AC1-147 E Adder 1.24 MW 1.06 MW
926755 AC1-161 E Adder 12.22 MW 10.39 MW
935112 AD1-144 E Adder 0.87 MW 0.74 MW
942341 AE2-247 C Adder 1.4 MW 1.19 MW
942342 AE2-247 E Adder 1.93 MW 1.64 MW
943461 AF1-017 C Adder 1.27 MW 1.08 MW
943462 AF1-017 E Adder 2.06 MW 1.75 MW
943612 AF1-032 E Adder 0.87 MW 0.74 MW
944871 AF1-152 C Adder 4.98 MW 4.23 MW
944872 AF1-152 E Adder 3.32 MW 2.82 MW
958502 AF2-144 E Adder 1.27 MW 1.08 MW
315102 1BRUNSWICKG1 50/50 8.12 MW 8.12 MW
315103 1BRUNSWICKG2 50/50 8.12 MW 8.12 MW
315104 1BRUNSWICKG3 50/50 8.12 MW 8.12 MW
315105 1BRUNSWICKS1 50/50 16.86 MW 16.86 MW
315173 1LOISA B 50/50 2.25 MW 2.25 MW
315176 1LOISA E 50/50 4.58 MW 4.58 MW
315177 1S ANNAG1 50/50 2.23 MW 2.23 MW
315178 1S ANNAS1 50/50 1.15 MW 1.15 MW
315179 1S ANNAG2 50/50 2.23 MW 2.23 MW
315180 1S ANNAS2 50/50 1.15 MW 1.15 MW
315225 1N ANNA1 50/50 86.67 MW 86.67 MW
315226 1N ANNA2 50/50 86.7 MW 86.7 MW
315241 1Z1-086 GT1 50/50 10.4 MW 10.4 MW
315242 1Z1-086 GT2 50/50 10.39 MW 10.39 MW
315243 1Z1-086 GT3 50/50 10.39 MW 10.39 MW
315244 1Z1-086 ST 50/50 18.1 MW 18.1 MW
315260 1GOSPORTA Adder 2.0 MW 1.7 MW
315261 1GOSPORTB Adder 2.56 MW 2.17 MW
315262 1GOSPORTC Adder 2.17 MW 1.84 MW
913392 Y1-086 E Adder 2.07 MW 1.76 MW
916192 Z1-068 E Adder 1.77 MW 1.5 MW
923832 AB2-022 E Adder 1.17 MW 0.99 MW
923852 AB2-025 E Adder 1.15 MW 0.98 MW
923862 AB2-026 E Adder 1.29 MW 1.09 MW
925022 AB2-158 E 50/50 9.53 MW 9.53 MW
938552 AE1-074 E 50/50 1.3 MW 1.3 MW
938562 AE1-075 E Adder 1.1 MW 0.93 MW
939312 AE1-162 E Adder 1.29 MW 1.1 MW
957492 AF2-043 E Adder 1.34 MW 1.14 MW
901082 W1-029 E Adder 30.02 MW 25.51 MW
917122 Z2-027 E Adder 1.26 MW 1.07 MW
925522 AC1-027 E Adder 1.15 MW 0.97 MW
941501 AE2-147 C Adder 14.93 MW 12.69 MW
941502 AE2-147 E Adder 9.95 MW 8.46 MW
942001 AE2-212 C Adder 1.96 MW 1.66 MW
942002 AE2-212 E Adder 1.3 MW 1.11 MW
957871 AF2-081 C Adder 9.42 MW 8.0 MW
957872 AF2-081 E Adder 4.04 MW 3.43 MW
958161 AF2-110 C Adder 1.29 MW 1.09 MW
958162 AF2-110 E Adder 2.05 MW 1.74 MW
926071 AC1-086 C Adder 19.92 MW 16.93 MW
926072 AC1-086 E Adder 9.07 MW 7.71 MW
933291 AC2-141 C Adder 28.62 MW 24.33 MW
933292 AC2-141 E Adder 12.22 MW 10.39 MW
934621 AD1-088 C Adder 11.58 MW 9.84 MW
934622 AD1-088 E Adder 5.45 MW 4.63 MW
939411 AE1-173 C 50/50 94.34 MW 94.34 MW
939412 AE1-173 E 50/50 62.9 MW 62.9 MW
962572 AG1-106 E Adder 1.29 MW 1.09 MW
961681 AG1-008 C Adder 14.87 MW 12.64 MW
961682 AG1-008 E Adder 7.52 MW 6.39 MW
962571 AG1-106 C Adder 2.82 MW 2.4 MW
208901 BRIS G2 50/50 -3.03 MW -3.03 MW
314594 6PLYMOUTH TP Adder 0.3 MW 0.26 MW
314632 6AYDLETT TAP Adder 1.28 MW 1.09 MW
316192 AB2-158 C 50/50 3.34 MW 3.34 MW
316233 AE1-074 C 50/50 2.57 MW 2.57 MW
316336 AC2-165 C Adder 10.07 MW 8.56 MW
924516 AB2-100 E1 Adder 2.79 MW 2.37 MW
924517 AB2-100 E2 Adder 2.79 MW 2.37 MW
934065 AD1-033 E Adder 4.73 MW 4.02 MW
937226 AE2-253 E Adder 5.51 MW 4.68 MW
919153 AA1-139 E2 Adder 3.85 MW 3.27 MW
919152 AA1-139 E1 Adder 3.85 MW 3.27 MW
920692 AA2-178 E Adder 3.87 MW 3.29 MW
923994 AB2-040_E Adder 5.86 MW 4.98 MW
316084 AB2-161 E Adder 5.15 MW 4.38 MW
316088 AB2-174 E Adder 6.22 MW 5.29 MW
932046 AC2-012 E Adder 12.32 MW 10.47 MW
316311 AC2-079 C Adder 5.38 MW 4.57 MW
932596 AC2-079 E Adder 8.78 MW 7.46 MW
934576 AD1-082 E Adder 4.1 MW 3.49 MW
316349 AD2-085 C Adder 3.23 MW 2.74 MW
936666 AD2-085 E Adder 5.27 MW 4.48 MW
941591 AE2-156 C Adder 16.83 MW 14.31 MW
944581 AF1-123 C Adder 43.08 MW 36.62 MW
944582 AF1-123 E Adder 98.64 MW 83.85 MW
944591 AF1-124 C Adder 43.23 MW 36.75 MW
944592 AF1-124 E Adder 99.0 MW 84.15 MW
944601 AF1-125 C Adder 42.41 MW 36.05 MW
944602 AF1-125 E Adder 97.1 MW 82.53 MW
957431 AF2-037 C 50/50 24.28 MW 24.28 MW
957432 AF2-037 E 50/50 16.19 MW 16.19 MW
957691 AF2-063 C 50/50 38.75 MW 38.75 MW
957692 AF2-063 E 50/50 25.83 MW 25.83 MW
962491 AG1-098 C Adder 10.43 MW 8.86 MW
962492 AG1-098 E Adder 6.95 MW 5.91 MW
964421 AG1-305 C 50/50 16.27 MW 16.27 MW
964422 AG1-305 E 50/50 10.85 MW 10.85 MW
965601 AG1-428 C Adder 4.54 MW 3.86 MW
965602 AG1-428 E Adder 3.03 MW 2.58 MW
965811 AG1-449 C 50/50 24.91 MW 24.91 MW
313764 3SOCKMAN Adder 0.68 MW 0.57 MW
934501 AD1-074 C Adder 1.48 MW 1.26 MW
934612 AD1-087 E Adder 3.61 MW 3.07 MW
935172 AD1-152 E Adder 5.33 MW 4.53 MW
937482 AD2-202 E Adder 1.06 MW 0.9 MW
938531 AE1-072 C Adder 16.56 MW 14.07 MW
938532 AE1-072 E Adder 8.63 MW 7.34 MW
939191 AE1-149 C Adder 9.95 MW 8.46 MW
939192 AE1-149 E Adder 6.63 MW 5.64 MW
940481 AE2-033 C Adder 15.95 MW 13.56 MW
940482 AE2-033 E Adder 10.76 MW 9.14 MW
940541 AE2-040 C Adder 2.84 MW 2.41 MW
940641 AE2-051 C 50/50 18.51 MW 18.51 MW
940642 AE2-051 E 50/50 12.34 MW 12.34 MW
941101 AE2-104 C Adder 3.16 MW 2.68 MW
941102 AE2-104 E Adder 5.02 MW 4.26 MW
941281 AE2-122 C Adder 26.79 MW 22.77 MW
941282 AE2-122 E Adder 108.11 MW 91.89 MW
316303 AF2-085 50/50 4.44 MW 4.44 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 27.68 MW 27.68 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 21.26 MW 21.26 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 90.75 MW 90.75 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.59 MW 5.59 MW
NY PJM->LTFIMP_NY CLTF 2.62 MW 2.62 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.18 MW 1.18 MW
WEC LTFEXP_WEC->PJM CLTF 0.59 MW 0.59 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.75 MW 10.75 MW
TVA LTFEXP_TVA->PJM CLTF 5.85 MW 5.85 MW
MEC LTFEXP_MEC->PJM CLTF 3.65 MW 3.65 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.36 MW 7.36 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.23 MW 0.23 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 35.58 MW 35.58 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.12 MW 5.12 MW

Details for 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 105.86 3220.44 B 3409.14 39.99
Elimination
Base Case Details for Eliminated Flowgate 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.42 MW 0.35 MW
962331 AG1-082 C Adder 1.66 MW 1.42 MW
962341 AG1-083 C Adder 1.66 MW 1.42 MW
963041 AG1-153 C Adder 4.28 MW 3.63 MW
964801 AG1-343 C Adder 4.96 MW 4.21 MW
965291 AG1-394 C Adder 0.71 MW 0.6 MW
966621 AG1-532 C Adder 1.12 MW 0.95 MW
934521 AD1-076 C Adder 10.28 MW 8.74 MW
942931 AE2-313 C Adder 27.53 MW 23.4 MW
944011 AF1-069 C Adder 9.95 MW 8.46 MW
960081 AF2-299 C Adder 1.61 MW 1.37 MW
941031 AE2-094 C Adder 30.46 MW 25.89 MW
946281 AF1-292 C Adder 1.23 MW 1.05 MW
957521 AF2-046 C Adder 13.04 MW 11.09 MW
938771 AE1-103 C Adder 2.5 MW 2.13 MW
314229 6MT RD221 80/20 0.11 MW 0.11 MW
314236 6NRTHEST 80/20 0.16 MW 0.16 MW
314309 6IRON208 80/20 0.38 MW 0.38 MW
314507 3THOMPSN Adder 1.78 MW 1.51 MW
315039 1LDYSMT3 80/20 4.11 MW 4.11 MW
315040 1LDYSMT4 80/20 4.11 MW 4.11 MW
315041 1LDYSMT5 80/20 4.13 MW 4.13 MW
315060 1CHESTF5 80/20 58.41 MW 58.41 MW
315061 1CHESTG7 80/20 3.3 MW 3.3 MW
315062 1CHESTS7 80/20 1.52 MW 1.52 MW
315063 1CHESTG8 80/20 3.25 MW 3.25 MW
315064 1CHESTS8 80/20 1.67 MW 1.67 MW
315065 1CHESTF6 Adder 17.82 MW 15.15 MW
315067 1DARBY 1 80/20 2.2 MW 2.2 MW
315068 1DARBY 2 80/20 2.21 MW 2.21 MW
315069 1DARBY 3 80/20 2.21 MW 2.21 MW
315070 1DARBY 4 80/20 2.22 MW 2.22 MW
315073 1STONECA Adder 6.29 MW 5.34 MW
315083 1SPRUNCA Adder 8.25 MW 7.02 MW
315084 1SPRUNCB Adder 8.25 MW 7.02 MW
315092 1YORKTN3 Adder 126.97 MW 107.93 MW
936591 AD2-074 C Adder 4.74 MW 4.03 MW
942341 AE2-247 C Adder 1.31 MW 1.11 MW
943461 AF1-017 C Adder 1.18 MW 1.01 MW
943741 AF1-042 C Adder 2.48 MW 2.11 MW
944871 AF1-152 C Adder 4.58 MW 3.89 MW
960091 AF2-300 C 80/20 2.06 MW 2.06 MW
961951 AG1-038 C Adder 2.74 MW 2.33 MW
966661 AG1-536 C Adder 4.54 MW 3.86 MW
966871 AG1-558 C Adder 2.2 MW 1.87 MW
966881 AG1-559 C 80/20 2.29 MW 2.29 MW
315225 1N ANNA1 80/20 24.22 MW 24.22 MW
315226 1N ANNA2 80/20 24.23 MW 24.23 MW
315260 1GOSPORTA Adder 1.87 MW 1.59 MW
315261 1GOSPORTB Adder 2.39 MW 2.03 MW
315262 1GOSPORTC Adder 2.03 MW 1.73 MW
316075 AC2-137 C 80/20 0.33 MW 0.33 MW
957411 AF2-035 C 80/20 8.26 MW 8.26 MW
957601 AF2-054 C Adder 1.86 MW 1.58 MW
962861 AG1-135 C Adder 5.14 MW 4.37 MW
962971 AG1-146 C Adder 2.65 MW 2.25 MW
962981 AG1-147 C Adder 6.18 MW 5.25 MW
963051 AG1-154 C 80/20 3.39 MW 3.39 MW
964211 AG1-282 C Adder 1.67 MW 1.42 MW
965441 AG1-412 C Adder 10.95 MW 9.31 MW
941501 AE2-147 C Adder 13.73 MW 11.67 MW
942001 AE2-212 C Adder 1.93 MW 1.64 MW
957871 AF2-081 C Adder 8.72 MW 7.41 MW
958161 AF2-110 C Adder 1.19 MW 1.01 MW
933291 AC2-141 C Adder 26.78 MW 22.76 MW
939411 AE1-173 C Adder 73.77 MW 62.7 MW
934011 AD1-025 C Adder 15.24 MW 12.95 MW
927041 AC1-191 C Adder 8.84 MW 7.52 MW
933981 AD1-022 C Adder 7.33 MW 6.23 MW
961681 AG1-008 C Adder 13.04 MW 11.09 MW
316004 AC1-112 C 80/20 0.29 MW 0.29 MW
316169 AC1-164 GEN 80/20 5.67 MW 5.67 MW
316233 AE1-074 C Adder 2.16 MW 1.84 MW
316240 AF1-291 C Adder 1.95 MW 1.66 MW
316301 AE2-228 C Adder 1.95 MW 1.66 MW
316304 AE2-227 C 80/20 2.01 MW 2.01 MW
316312 AB1-027 C 80/20 0.46 MW 0.46 MW
963221 AG1-171 C Adder 1.94 MW 1.65 MW
963231 AG1-172 C Adder 1.94 MW 1.65 MW
963241 AG1-173 C Adder 1.94 MW 1.65 MW
315037 1LDYSMT1 80/20 3.95 MW 3.95 MW
315038 1LDYSMT2 80/20 4.0 MW 4.0 MW
315051 AA1-145 CT1 80/20 4.38 MW 4.38 MW
315052 AA1-145 CT2 80/20 4.38 MW 4.38 MW
316427 AG1-213 C 80/20 0.69 MW 0.69 MW
315043 1FOUR RIVERA 80/20 2.75 MW 2.75 MW
315044 1FOUR RIVERB 80/20 2.75 MW 2.75 MW
315045 1FOUR RIVERC 80/20 3.36 MW 3.36 MW
315046 1FOUR RIVERD 80/20 2.71 MW 2.71 MW
315047 1FOUR RIVERE 80/20 2.71 MW 2.71 MW
315048 1FOUR RIVERF 80/20 3.31 MW 3.31 MW
316311 AC2-079 C Adder 5.02 MW 4.27 MW
316349 AD2-085 C Adder 3.02 MW 2.56 MW
961611 AG1-000B C Adder 14.29 MW 12.14 MW
941591 AE2-156 C Adder 15.75 MW 13.39 MW
942371 AE2-250 C Adder 8.72 MW 7.41 MW
944581 AF1-123 C Adder 39.85 MW 33.87 MW
944591 AF1-124 C Adder 39.99 MW 33.99 MW
944601 AF1-125 C Adder 39.23 MW 33.35 MW
944631 AF1-128 C Adder 36.55 MW 31.06 MW
958261 AF2-120 C Adder 5.28 MW 4.49 MW
962271 AG1-075 C Adder 15.05 MW 12.79 MW
965281 AG1-393 C Adder 1.94 MW 1.65 MW
965691 AG1-437 C Adder 8.45 MW 7.18 MW
965701 AG1-438 C Adder 8.45 MW 7.18 MW
965741 AG1-442 C Adder 4.93 MW 4.19 MW
965751 AG1-443 C Adder 4.93 MW 4.19 MW
965811 AG1-449 C Adder 17.83 MW 15.15 MW
934501 AD1-074 C Adder 28.31 MW 24.06 MW
934511 AD1-075 C Adder 7.08 MW 6.01 MW
935161 AD1-151 C Adder 14.59 MW 12.4 MW
938531 AE1-072 C Adder 15.33 MW 13.03 MW
939191 AE1-149 C Adder 9.52 MW 8.09 MW
939261 AE1-157 C 80/20 13.32 MW 13.32 MW
940431 AE2-027 C Adder 11.66 MW 9.91 MW
940481 AE2-033 C Adder 13.16 MW 11.19 MW
940541 AE2-040 C Adder 2.34 MW 1.99 MW
940551 AE2-041 C Adder 6.31 MW 5.37 MW
940641 AE2-051 C Adder 13.74 MW 11.68 MW
941101 AE2-104 C Adder 2.92 MW 2.49 MW
941281 AE2-122 C Adder 24.96 MW 21.22 MW
942191 AE2-231 C 80/20 4.54 MW 4.54 MW
943471 AF1-018 C Adder 6.31 MW 5.37 MW
944641 AF1-129 C Adder 92.95 MW 79.01 MW
963622 AG1-213 E 80/20 0.69 MW 0.69 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 45.31 MW 45.31 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 25.79 MW 25.79 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 81.4 MW 81.4 MW
NY PJM->LTFIMP_NY CLTF 2.85 MW 2.85 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.8 MW 1.8 MW
WEC LTFEXP_WEC->PJM CLTF 0.93 MW 0.93 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.11 MW 9.11 MW
TVA LTFEXP_TVA->PJM CLTF 6.54 MW 6.54 MW
MEC LTFEXP_MEC->PJM CLTF 5.11 MW 5.11 MW
LAGN LTFEXP_LAGN->PJM CLTF 8.15 MW 8.15 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.33 MW 0.33 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.35 MW 4.35 MW

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 130.64 3220.44 B 4207.12 49.69
Elimination
Base Case Details for Eliminated Flowgate 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.52 MW 0.44 MW
962331 AG1-082 C Adder 2.07 MW 1.76 MW
962341 AG1-083 C Adder 2.07 MW 1.76 MW
963041 AG1-153 C Adder 5.7 MW 4.84 MW
964801 AG1-343 C Adder 6.18 MW 5.26 MW
966801 AG1-551 C Adder 2.11 MW 1.8 MW
966811 AG1-552 C Adder 2.06 MW 1.75 MW
965291 AG1-394 C Adder 0.88 MW 0.75 MW
965591 AG1-427 C Adder 11.05 MW 9.39 MW
966621 AG1-532 C Adder 1.41 MW 1.2 MW
934521 AD1-076 C Adder 12.77 MW 10.86 MW
942931 AE2-313 C 80/20 36.87 MW 36.87 MW
944011 AF1-069 C 80/20 13.36 MW 13.36 MW
960081 AF2-299 C Adder 2.04 MW 1.73 MW
939181 AE1-148 C Adder 8.47 MW 7.2 MW
941031 AE2-094 C 80/20 40.88 MW 40.88 MW
946281 AF1-292 C Adder 1.56 MW 1.32 MW
957481 AF2-042 C Adder 53.34 MW 45.34 MW
957521 AF2-046 C Adder 16.27 MW 13.83 MW
957861 AF2-080 C Adder 7.53 MW 6.4 MW
938771 AE1-103 C Adder 3.11 MW 2.65 MW
314236 6NRTHEST 80/20 0.18 MW 0.18 MW
314309 6IRON208 80/20 0.44 MW 0.44 MW
314507 3THOMPSN Adder 2.2 MW 1.87 MW
315060 1CHESTF5 Adder 68.0 MW 57.8 MW
315065 1CHESTF6 80/20 21.45 MW 21.45 MW
315073 1STONECA 80/20 7.5 MW 7.5 MW
315076 1HOPPOLC 80/20 1.54 MW 1.54 MW
315077 1HOPHCF1 80/20 2.46 MW 2.46 MW
315078 1HOPHCF2 80/20 2.46 MW 2.46 MW
315079 1HOPHCF3 80/20 2.46 MW 2.46 MW
315080 1HOPHCF4 80/20 3.73 MW 3.73 MW
315083 1SPRUNCA 80/20 10.06 MW 10.06 MW
315084 1SPRUNCB 80/20 10.06 MW 10.06 MW
315092 1YORKTN3 Adder 151.6 MW 128.86 MW
936591 AD2-074 C Adder 5.65 MW 4.8 MW
942341 AE2-247 C Adder 1.62 MW 1.38 MW
943461 AF1-017 C Adder 1.47 MW 1.25 MW
943741 AF1-042 C Adder 2.96 MW 2.51 MW
944871 AF1-152 C Adder 5.68 MW 4.83 MW
960091 AF2-300 C Adder 2.12 MW 1.81 MW
961951 AG1-038 C Adder 3.27 MW 2.78 MW
966661 AG1-536 C Adder 5.43 MW 4.62 MW
966871 AG1-558 C Adder 2.47 MW 2.1 MW
966881 AG1-559 C Adder 2.36 MW 2.0 MW
315108 1ELIZAR1 80/20 3.23 MW 3.23 MW
315109 1ELIZAR2 80/20 3.18 MW 3.18 MW
315110 1ELIZAR3 80/20 3.28 MW 3.28 MW
315225 1N ANNA1 80/20 50.84 MW 50.84 MW
315226 1N ANNA2 80/20 50.85 MW 50.85 MW
315233 1SURRY 2 80/20 25.02 MW 25.02 MW
315260 1GOSPORTA Adder 2.32 MW 1.97 MW
315261 1GOSPORTB Adder 2.96 MW 2.52 MW
315262 1GOSPORTC Adder 2.52 MW 2.14 MW
957411 AF2-035 C Adder 8.5 MW 7.23 MW
957601 AF2-054 C Adder 2.18 MW 1.85 MW
962861 AG1-135 C Adder 6.14 MW 5.22 MW
962971 AG1-146 C Adder 3.14 MW 2.67 MW
962981 AG1-147 C Adder 7.33 MW 6.23 MW
963051 AG1-154 C Adder 3.38 MW 2.87 MW
963611 AG1-210 C Adder 0.66 MW 0.56 MW
964211 AG1-282 C Adder 2.0 MW 1.7 MW
941501 AE2-147 C Adder 17.04 MW 14.48 MW
942001 AE2-212 C 80/20 2.36 MW 2.36 MW
957871 AF2-081 C Adder 10.83 MW 9.2 MW
958161 AF2-110 C Adder 1.48 MW 1.26 MW
926071 AC1-086 C Adder 21.18 MW 18.0 MW
927021 AC1-189 C Adder 8.29 MW 7.05 MW
936261 AD2-033 C Adder 12.0 MW 10.2 MW
933291 AC2-141 C 80/20 33.19 MW 33.19 MW
934621 AD1-088 C Adder 11.4 MW 9.69 MW
939411 AE1-173 C 80/20 96.37 MW 96.37 MW
934011 AD1-025 C Adder 18.35 MW 15.59 MW
315085 1SPRUNCC 80/20 0.17 MW 0.17 MW
315086 1SPRUNCD 80/20 0.17 MW 0.17 MW
927041 AC1-191 C Adder 9.91 MW 8.43 MW
933981 AD1-022 C Adder 9.11 MW 7.75 MW
961681 AG1-008 C Adder 16.27 MW 13.83 MW
962571 AG1-106 C Adder 3.0 MW 2.55 MW
316192 AB2-158 C 80/20 1.91 MW 1.91 MW
316210 AC1-098 C Adder 6.11 MW 5.2 MW
316212 AC1-099 C Adder 2.05 MW 1.74 MW
316233 AE1-074 C 80/20 2.77 MW 2.77 MW
316240 AF1-291 C 80/20 2.36 MW 2.36 MW
316274 AC1-208 C Adder 8.95 MW 7.61 MW
316294 AC1-161 C 80/20 5.03 MW 5.03 MW
316301 AE2-228 C 80/20 2.36 MW 2.36 MW
316304 AE2-227 C 80/20 2.35 MW 2.35 MW
316336 AC2-165 C Adder 9.87 MW 8.39 MW
963221 AG1-171 C Adder 2.34 MW 1.99 MW
963231 AG1-172 C Adder 2.34 MW 1.99 MW
963241 AG1-173 C Adder 2.34 MW 1.99 MW
316427 AG1-213 C Adder 0.71 MW 0.6 MW
316044 AC1-158 C1 80/20 13.84 MW 13.84 MW
316045 AC1-158 C2 80/20 13.84 MW 13.84 MW
316375 AC2-012 C 80/20 1.37 MW 1.37 MW
316311 AC2-079 C Adder 6.22 MW 5.29 MW
316349 AD2-085 C Adder 3.74 MW 3.18 MW
961611 AG1-000B C Adder 17.31 MW 14.71 MW
941591 AE2-156 C 80/20 19.51 MW 19.51 MW
942371 AE2-250 C 80/20 10.59 MW 10.59 MW
944581 AF1-123 C 80/20 49.52 MW 49.52 MW
944591 AF1-124 C 80/20 49.69 MW 49.69 MW
944601 AF1-125 C 80/20 48.75 MW 48.75 MW
944631 AF1-128 C Adder 42.55 MW 36.17 MW
957431 AF2-037 C 80/20 14.03 MW 14.03 MW
957691 AF2-063 C 80/20 22.39 MW 22.39 MW
958261 AF2-120 C Adder 6.32 MW 5.37 MW
962271 AG1-075 C 80/20 18.28 MW 18.28 MW
962491 AG1-098 C Adder 10.26 MW 8.72 MW
964241 AG1-285 C Adder 11.63 MW 9.89 MW
964421 AG1-305 C 80/20 9.4 MW 9.4 MW
965281 AG1-393 C 80/20 2.35 MW 2.35 MW
965601 AG1-428 C Adder 4.7 MW 4.0 MW
965691 AG1-437 C Adder 10.51 MW 8.93 MW
965701 AG1-438 C Adder 10.51 MW 8.93 MW
965711 AG1-439 C Adder 23.1 MW 19.63 MW
965741 AG1-442 C Adder 6.13 MW 5.21 MW
965751 AG1-443 C Adder 6.13 MW 5.21 MW
965761 AG1-444 C Adder 12.32 MW 10.47 MW
965811 AG1-449 C 80/20 23.88 MW 23.88 MW
313764 3SOCKMAN Adder 0.72 MW 0.61 MW
932631 AC2-084 C Adder 6.53 MW 5.55 MW
934321 AD1-056 C Adder 6.16 MW 5.24 MW
934331 AD1-057 C Adder 3.44 MW 2.92 MW
934501 AD1-074 C Adder 35.17 MW 29.9 MW
934511 AD1-075 C Adder 8.79 MW 7.47 MW
935161 AD1-151 C Adder 17.54 MW 14.91 MW
938531 AE1-072 C Adder 19.02 MW 16.17 MW
939191 AE1-149 C 80/20 11.74 MW 11.74 MW
939261 AE1-157 C Adder 13.54 MW 11.51 MW
940431 AE2-027 C 80/20 14.11 MW 14.11 MW
940481 AE2-033 C Adder 16.84 MW 14.31 MW
940541 AE2-040 C Adder 3.0 MW 2.55 MW
940551 AE2-041 C Adder 7.35 MW 6.25 MW
940641 AE2-051 C 80/20 18.25 MW 18.25 MW
941101 AE2-104 C Adder 3.63 MW 3.08 MW
941281 AE2-122 C Adder 30.95 MW 26.31 MW
942191 AE2-231 C Adder 4.68 MW 3.97 MW
943471 AF1-018 C Adder 7.35 MW 6.25 MW
944641 AF1-129 C 80/20 111.84 MW 111.84 MW
316303 AF2-085 80/20 4.29 MW 4.29 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 26.57 MW 26.57 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 21.51 MW 21.51 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 92.59 MW 92.59 MW
NY PJM->LTFIMP_NY CLTF 2.77 MW 2.77 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.18 MW 1.18 MW
WEC LTFEXP_WEC->PJM CLTF 0.57 MW 0.57 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.92 MW 10.92 MW
TVA LTFEXP_TVA->PJM CLTF 6.0 MW 6.0 MW
MEC LTFEXP_MEC->PJM CLTF 3.63 MW 3.63 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.5 MW 7.5 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.23 MW 0.23 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.21 MW 5.21 MW

Details for 8OX-8CLIFTON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 569_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8OX-8CLIFTON 500.0 kV Ckt 1 line
314919 to 314904 ckt 1
DVP_P1-2: LN 569_SRT-S
CONTINGENCY 'DVP_P1-2: LN 569_SRT-S'
 OPEN BRANCH FROM BUS 314913 TO BUS 314916 CKT 1                /*8LOUDOUN     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Single AC 101.58 2686.52 B 2728.9 27.54
Elimination
Base Case Details for Eliminated Flowgate 8OX-8CLIFTON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 569_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
942931 AE2-313 C Adder 19.19 MW 16.31 MW
944011 AF1-069 C Adder 6.94 MW 5.9 MW
941031 AE2-094 C Adder 21.26 MW 18.07 MW
938771 AE1-103 C Adder 1.72 MW 1.46 MW
314131 6ARNOLDS 80/20 0.18 MW 0.18 MW
314507 3THOMPSN Adder 1.22 MW 1.04 MW
315001 1OMF A 80/20 0.81 MW 0.81 MW
315002 1OMF B 80/20 0.81 MW 0.81 MW
315007 1POSSM 5 80/20 104.68 MW 104.68 MW
315008 1POSSM6A 80/20 3.53 MW 3.53 MW
315009 1POSSM6B 80/20 3.53 MW 3.53 MW
315010 1POSSM6S 80/20 5.5 MW 5.5 MW
315015 1POSSMC1 80/20 0.78 MW 0.78 MW
315018 1POSSMC2 80/20 0.79 MW 0.79 MW
315033 1BIRCHWDA 80/20 32.69 MW 32.69 MW
315039 1LDYSMT3 80/20 3.44 MW 3.44 MW
315040 1LDYSMT4 80/20 3.45 MW 3.45 MW
315041 1LDYSMT5 80/20 3.46 MW 3.46 MW
315060 1CHESTF5 Adder 40.32 MW 34.27 MW
315065 1CHESTF6 Adder 12.32 MW 10.47 MW
315073 1STONECA Adder 4.34 MW 3.69 MW
315083 1SPRUNCA Adder 5.74 MW 4.88 MW
315084 1SPRUNCB Adder 5.74 MW 4.88 MW
315092 1YORKTN3 Adder 88.32 MW 75.07 MW
934781 AD1-105 C 80/20 0.83 MW 0.83 MW
934861 AD1-115 C Adder 1.95 MW 1.66 MW
936591 AD2-074 C Adder 3.88 MW 3.3 MW
942341 AE2-247 C Adder 0.9 MW 0.77 MW
943461 AF1-017 C Adder 0.82 MW 0.69 MW
943741 AF1-042 C Adder 2.03 MW 1.73 MW
944491 AF1-114 C 80/20 5.41 MW 5.41 MW
944871 AF1-152 C Adder 3.14 MW 2.67 MW
960091 AF2-300 C 80/20 1.61 MW 1.61 MW
961951 AG1-038 C Adder 2.25 MW 1.91 MW
966661 AG1-536 C Adder 3.83 MW 3.25 MW
966871 AG1-558 C Adder 1.6 MW 1.36 MW
966881 AG1-559 C 80/20 1.79 MW 1.79 MW
315225 1N ANNA1 80/20 19.78 MW 19.78 MW
315226 1N ANNA2 80/20 19.79 MW 19.79 MW
315260 1GOSPORTA Adder 1.29 MW 1.1 MW
315261 1GOSPORTB Adder 1.65 MW 1.4 MW
315262 1GOSPORTC Adder 1.4 MW 1.19 MW
957411 AF2-035 C 80/20 6.46 MW 6.46 MW
957601 AF2-054 C Adder 1.39 MW 1.18 MW
962861 AG1-135 C Adder 4.3 MW 3.65 MW
962971 AG1-146 C Adder 2.13 MW 1.81 MW
962981 AG1-147 C Adder 4.98 MW 4.23 MW
963051 AG1-154 C 80/20 2.85 MW 2.85 MW
963611 AG1-210 C Adder 0.48 MW 0.41 MW
964211 AG1-282 C Adder 1.44 MW 1.23 MW
965441 AG1-412 C 80/20 11.37 MW 11.37 MW
941501 AE2-147 C Adder 9.43 MW 8.01 MW
942001 AE2-212 C Adder 1.34 MW 1.14 MW
957871 AF2-081 C Adder 6.0 MW 5.1 MW
957971 AF2-091 C 80/20 1.84 MW 1.84 MW
958161 AF2-110 C Adder 0.82 MW 0.7 MW
966331 AG1-502 C Adder 7.09 MW 6.02 MW
966341 AG1-503 C Adder 1.77 MW 1.51 MW
933291 AC2-141 C Adder 18.42 MW 15.66 MW
939411 AE1-173 C Adder 51.36 MW 43.65 MW
934011 AD1-025 C Adder 10.52 MW 8.95 MW
927041 AC1-191 C Adder 6.42 MW 5.46 MW
316170 AC1-121 C Adder 1.47 MW 1.25 MW
316233 AE1-074 C Adder 1.52 MW 1.29 MW
316240 AF1-291 C Adder 1.35 MW 1.15 MW
316254 AC1-120 C Adder 4.29 MW 3.64 MW
316257 AC1-043 C Adder 3.91 MW 3.32 MW
316301 AE2-228 C Adder 1.35 MW 1.15 MW
316304 AE2-227 C Adder 1.39 MW 1.18 MW
963221 AG1-171 C Adder 1.34 MW 1.14 MW
963231 AG1-172 C Adder 1.34 MW 1.14 MW
963241 AG1-173 C Adder 1.34 MW 1.14 MW
315037 1LDYSMT1 80/20 3.31 MW 3.31 MW
315038 1LDYSMT2 80/20 3.36 MW 3.36 MW
315051 AA1-145 CT1 80/20 3.13 MW 3.13 MW
315052 AA1-145 CT2 80/20 3.13 MW 3.13 MW
316223 AC1-118 C 80/20 0.25 MW 0.25 MW
316427 AG1-213 C 80/20 0.54 MW 0.54 MW
316411 AF1-147_GEN1 Adder -5.23 MW -4.45 MW
316415 AF1-147_GEN2 Adder -5.23 MW -4.45 MW
315043 1FOUR RIVERA 80/20 1.97 MW 1.97 MW
315044 1FOUR RIVERB 80/20 1.97 MW 1.97 MW
315045 1FOUR RIVERC 80/20 2.4 MW 2.4 MW
315046 1FOUR RIVERD 80/20 1.94 MW 1.94 MW
315047 1FOUR RIVERE 80/20 1.94 MW 1.94 MW
315048 1FOUR RIVERF 80/20 2.37 MW 2.37 MW
316044 AC1-158 C1 80/20 3.57 MW 3.57 MW
316045 AC1-158 C2 80/20 3.57 MW 3.57 MW
316311 AC2-079 C Adder 3.46 MW 2.94 MW
316349 AD2-085 C Adder 2.08 MW 1.77 MW
961611 AG1-000B C Adder 9.87 MW 8.39 MW
941591 AE2-156 C Adder 10.85 MW 9.22 MW
942371 AE2-250 C Adder 6.05 MW 5.14 MW
944581 AF1-123 C Adder 27.44 MW 23.33 MW
944591 AF1-124 C Adder 27.54 MW 23.41 MW
944601 AF1-125 C Adder 27.02 MW 22.97 MW
944631 AF1-128 C Adder 25.23 MW 21.44 MW
957431 AF2-037 C Adder 6.83 MW 5.81 MW
957691 AF2-063 C Adder 10.9 MW 9.27 MW
958261 AF2-120 C Adder 4.45 MW 3.78 MW
962271 AG1-075 C Adder 10.44 MW 8.88 MW
964421 AG1-305 C Adder 4.58 MW 3.89 MW
965281 AG1-393 C Adder 1.34 MW 1.14 MW
965811 AG1-449 C Adder 12.43 MW 10.56 MW
935161 AD1-151 C Adder 10.08 MW 8.57 MW
938531 AE1-072 C Adder 10.54 MW 8.96 MW
939191 AE1-149 C Adder 6.59 MW 5.6 MW
939261 AE1-157 C 80/20 10.69 MW 10.69 MW
940431 AE2-027 C Adder 8.09 MW 6.88 MW
940481 AE2-033 C Adder 9.09 MW 7.73 MW
940541 AE2-040 C Adder 1.62 MW 1.38 MW
940551 AE2-041 C Adder 4.67 MW 3.97 MW
940641 AE2-051 C Adder 9.6 MW 8.16 MW
941101 AE2-104 C Adder 2.01 MW 1.71 MW
941281 AE2-122 C Adder 17.19 MW 14.61 MW
942191 AE2-231 C 80/20 3.55 MW 3.55 MW
943471 AF1-018 C Adder 4.67 MW 3.97 MW
944641 AF1-129 C Adder 64.24 MW 54.6 MW
957191 AF2-013 C 80/20 13.35 MW 13.35 MW
963622 AG1-213 E 80/20 0.54 MW 0.54 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 6.12 MW 6.12 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 8.91 MW 8.91 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 47.33 MW 47.33 MW
NY PJM->LTFIMP_NY CLTF 1.78 MW 1.78 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.37 MW 0.37 MW
WEC LTFEXP_WEC->PJM CLTF 0.15 MW 0.15 MW
CPLE LTFEXP_CPLE->PJM CLTF 5.68 MW 5.68 MW
TVA LTFEXP_TVA->PJM CLTF 2.72 MW 2.72 MW
MEC LTFEXP_MEC->PJM CLTF 1.24 MW 1.24 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.39 MW 3.39 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.08 MW 0.08 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.71 MW 2.71 MW

Details for 8BRISTER-8OX 500.0 kV Ckt 1 line l/o DVP_P4-2: 541T569_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8BRISTER-8OX 500.0 kV Ckt 1 line
314900 to 314919 ckt 1
DVP_P4-2: 541T569_SRT-S
CONTINGENCY 'DVP_P4-2: 541T569_SRT-S'
 OPEN BRANCH FROM BUS 314913 TO BUS 314916 CKT 1   /*8LOUDOUN     500.0 - 8MORRSVL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314929 CKT 1   /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Breaker AC 102.37 3940.0 C 4033.4 120.57
Elimination
Base Case Details for Eliminated Flowgate 8BRISTER-8OX 500.0 kV Ckt 1 line l/o DVP_P4-2: 541T569_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944011 AF1-069 C Adder 9.69 MW 8.23 MW
944012 AF1-069 E Adder 3.76 MW 3.2 MW
941031 AE2-094 C Adder 29.65 MW 25.2 MW
941032 AE2-094 E Adder 13.28 MW 11.29 MW
314331 6POE Adder 1.09 MW 0.93 MW
314507 3THOMPSN Adder 1.62 MW 1.38 MW
314550 6HICKORY Adder 1.75 MW 1.48 MW
315021 1REMNGT1 50/50 5.83 MW 5.83 MW
315022 1REMNGT2 50/50 5.89 MW 5.89 MW
315023 1REMNGT3 50/50 6.63 MW 6.63 MW
315024 1REMNGT4 50/50 5.91 MW 5.91 MW
315028 1M RUN A 50/50 6.53 MW 6.53 MW
315029 1M RUN B 50/50 6.48 MW 6.48 MW
315030 1M RUN C 50/50 6.53 MW 6.53 MW
315060 1CHESTF5 Adder 50.84 MW 43.22 MW
315065 1CHESTF6 Adder 15.92 MW 13.53 MW
315073 1STONECA Adder 5.58 MW 4.74 MW
315083 1SPRUNCA Adder 7.46 MW 6.34 MW
315084 1SPRUNCB Adder 7.46 MW 6.34 MW
315092 1YORKTN3 Adder 112.5 MW 95.63 MW
926412 AC1-112 E Adder 0.89 MW 0.75 MW
926662 AC1-147 E Adder 1.07 MW 0.91 MW
926755 AC1-161 E Adder 10.45 MW 8.88 MW
927226 AC1-216 E Adder 6.23 MW 5.29 MW
934861 AD1-115 C 50/50 4.79 MW 4.79 MW
934862 AD1-115 E 50/50 7.82 MW 7.82 MW
942152 AE2-227 E Adder 1.17 MW 1.0 MW
942162 AE2-228 E Adder 1.17 MW 0.99 MW
315177 1S ANNAG1 50/50 2.32 MW 2.32 MW
315178 1S ANNAS1 50/50 1.19 MW 1.19 MW
315179 1S ANNAG2 50/50 2.32 MW 2.32 MW
315180 1S ANNAS2 50/50 1.19 MW 1.19 MW
315225 1N ANNA1 50/50 32.53 MW 32.53 MW
315226 1N ANNA2 50/50 32.54 MW 32.54 MW
315260 1GOSPORTA Adder 1.71 MW 1.46 MW
315261 1GOSPORTB Adder 2.19 MW 1.86 MW
315262 1GOSPORTC Adder 1.86 MW 1.58 MW
316076 AC2-137 E Adder 1.06 MW 0.9 MW
916192 Z1-068 E Adder 1.51 MW 1.28 MW
925022 AB2-158 E 50/50 5.93 MW 5.93 MW
930122 AB1-027 E Adder 1.09 MW 0.93 MW
938552 AE1-074 E Adder 1.03 MW 0.87 MW
939312 AE1-162 E Adder 1.15 MW 0.98 MW
946262 AF1-291 E Adder 1.17 MW 0.99 MW
962962 AG1-145 E Adder 1.15 MW 0.97 MW
963031 AG1-152 C 50/50 10.29 MW 10.29 MW
963032 AG1-152 E 50/50 15.44 MW 15.44 MW
966001 AG1-469 C 50/50 2.03 MW 2.03 MW
966002 AG1-469 E 50/50 1.02 MW 1.02 MW
925332 AB2-190 E Adder 6.52 MW 5.54 MW
925522 AC1-027 E Adder 0.98 MW 0.83 MW
925672 AC1-043 E 50/50 15.63 MW 15.63 MW
942001 AE2-212 C Adder 1.75 MW 1.49 MW
942002 AE2-212 E Adder 1.16 MW 0.99 MW
957871 AF2-081 C Adder 7.99 MW 6.79 MW
957872 AF2-081 E Adder 0.82 MW 0.7 MW
966331 AG1-502 C 50/50 16.0 MW 16.0 MW
966332 AG1-502 E 50/50 4.0 MW 4.0 MW
966341 AG1-503 C 50/50 4.0 MW 4.0 MW
966342 AG1-503 E 50/50 1.0 MW 1.0 MW
313811 6ELKO L286 Adder 1.1 MW 0.94 MW
933291 AC2-141 C Adder 24.48 MW 20.81 MW
933292 AC2-141 E Adder 10.45 MW 8.88 MW
939411 AE1-173 C Adder 70.18 MW 59.65 MW
939412 AE1-173 E Adder 46.78 MW 39.77 MW
923892 AB2-029 E 50/50 3.14 MW 3.14 MW
934011 AD1-025 C Adder 13.62 MW 11.57 MW
934012 AD1-025 E Adder 8.07 MW 6.86 MW
316160 AE1-175 E Adder 0.95 MW 0.8 MW
316164 AC1-076_C 50/50 0.94 MW 0.94 MW
316170 AC1-121 C 50/50 3.41 MW 3.41 MW
316192 AB2-158 C 50/50 2.08 MW 2.08 MW
316233 AE1-074 C Adder 2.04 MW 1.73 MW
316240 AF1-291 C Adder 1.75 MW 1.49 MW
316254 AC1-120 C 50/50 9.93 MW 9.93 MW
316257 AC1-043 C 50/50 9.58 MW 9.58 MW
316301 AE2-228 C Adder 1.75 MW 1.49 MW
316304 AE2-227 C Adder 1.76 MW 1.5 MW
926785 AC1-164_E Adder 14.27 MW 12.13 MW
934065 AD1-033 E Adder 4.02 MW 3.42 MW
937226 AE2-253 E Adder 4.68 MW 3.97 MW
963221 AG1-171 C Adder 1.73 MW 1.47 MW
963222 AG1-171 E Adder 1.16 MW 0.98 MW
963231 AG1-172 C Adder 1.73 MW 1.47 MW
963232 AG1-172 E Adder 1.16 MW 0.98 MW
963241 AG1-173 C Adder 1.73 MW 1.47 MW
963242 AG1-173 E Adder 1.16 MW 0.98 MW
926004 AC1-076_E 50/50 5.76 MW 5.76 MW
926486 AC1-120 E 50/50 5.11 MW 5.11 MW
926502 AC1-121 E 50/50 1.6 MW 1.6 MW
926615 AC1-143 E 50/50 4.81 MW 4.81 MW
316006 AB2-029 C 50/50 0.3 MW 0.3 MW
316267 AC1-143 C 50/50 10.54 MW 10.54 MW
924814 AB2-134 E Adder 10.2 MW 8.67 MW
316084 AB2-161 E Adder 4.45 MW 3.79 MW
316044 AC1-158 C1 50/50 7.41 MW 7.41 MW
316045 AC1-158 C2 50/50 7.41 MW 7.41 MW
926739 AC1-158 E1 50/50 20.78 MW 20.78 MW
926740 AC1-158 E2 50/50 20.78 MW 20.78 MW
932046 AC2-012 E Adder 10.54 MW 8.96 MW
934576 AD1-082 E Adder 3.55 MW 3.02 MW
961611 AG1-000B C Adder 12.83 MW 10.9 MW
941591 AE2-156 C Adder 14.4 MW 12.24 MW
942371 AE2-250 C Adder 7.84 MW 6.67 MW
942372 AE2-250 E Adder 4.14 MW 3.52 MW
944581 AF1-123 C Adder 36.52 MW 31.04 MW
944582 AF1-123 E Adder 83.62 MW 71.08 MW
944591 AF1-124 C Adder 36.65 MW 31.15 MW
944592 AF1-124 E Adder 83.92 MW 71.33 MW
944601 AF1-125 C Adder 35.95 MW 30.56 MW
944602 AF1-125 E Adder 82.31 MW 69.96 MW
944631 AF1-128 C Adder 31.81 MW 27.04 MW
957431 AF2-037 C 50/50 12.44 MW 12.44 MW
957432 AF2-037 E 50/50 8.29 MW 8.29 MW
957691 AF2-063 C 50/50 19.85 MW 19.85 MW
957692 AF2-063 E 50/50 13.23 MW 13.23 MW
962271 AG1-075 C Adder 13.54 MW 11.51 MW
962272 AG1-075 E Adder 8.25 MW 7.01 MW
964421 AG1-305 C 50/50 8.34 MW 8.34 MW
964422 AG1-305 E 50/50 5.56 MW 5.56 MW
965281 AG1-393 C Adder 1.74 MW 1.48 MW
965282 AG1-393 E Adder 1.16 MW 0.99 MW
935161 AD1-151 C Adder 13.02 MW 11.07 MW
935162 AD1-151 E Adder 8.68 MW 7.38 MW
938291 AE1-044 C 50/50 32.29 MW 32.29 MW
938292 AE1-044 E 50/50 25.48 MW 25.48 MW
939191 AE1-149 C Adder 8.67 MW 7.37 MW
939192 AE1-149 E Adder 5.78 MW 4.91 MW
939221 AE1-153 C 50/50 21.59 MW 21.59 MW
939222 AE1-153 E 50/50 14.39 MW 14.39 MW
940431 AE2-027 C Adder 10.46 MW 8.89 MW
940432 AE2-027 E Adder 6.97 MW 5.92 MW
940641 AE2-051 C Adder 13.24 MW 11.25 MW
940642 AE2-051 E Adder 8.82 MW 7.5 MW
941281 AE2-122 C Adder 22.84 MW 19.42 MW
941282 AE2-122 E Adder 92.17 MW 78.35 MW
944641 AF1-129 C Adder 83.04 MW 70.58 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 31.56 MW 31.56 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 20.49 MW 20.49 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 73.76 MW 73.76 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.92 MW 5.92 MW
NY PJM->LTFIMP_NY CLTF 2.71 MW 2.71 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.31 MW 1.31 MW
WEC LTFEXP_WEC->PJM CLTF 0.66 MW 0.66 MW
CPLE LTFEXP_CPLE->PJM CLTF 8.43 MW 8.43 MW
TVA LTFEXP_TVA->PJM CLTF 5.41 MW 5.41 MW
MEC LTFEXP_MEC->PJM CLTF 3.81 MW 3.81 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.74 MW 6.74 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.25 MW 0.25 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 37.64 MW 37.64 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.02 MW 4.02 MW

Details for 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 126.76 3220.44 B 4082.33 51.55
Elimination
Base Case Details for Eliminated Flowgate 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.95 MW 0.81 MW
961941 AG1-037 C Adder 0.54 MW 0.46 MW
962331 AG1-082 C Adder 2.15 MW 1.83 MW
962341 AG1-083 C Adder 2.15 MW 1.83 MW
963041 AG1-153 C Adder 5.91 MW 5.02 MW
964111 AG1-272 C Adder 0.95 MW 0.81 MW
964121 AG1-273 C Adder 0.95 MW 0.81 MW
964131 AG1-274 C Adder 0.95 MW 0.81 MW
964801 AG1-343 C Adder 6.41 MW 5.45 MW
966801 AG1-551 C Adder 2.19 MW 1.86 MW
966811 AG1-552 C Adder 2.14 MW 1.82 MW
965191 AG1-384 C Adder 0.95 MW 0.81 MW
965291 AG1-394 C Adder 0.92 MW 0.78 MW
965591 AG1-427 C Adder 11.4 MW 9.69 MW
966621 AG1-532 C Adder 1.46 MW 1.24 MW
934521 AD1-076 C Adder 13.25 MW 11.27 MW
942931 AE2-313 C 80/20 38.23 MW 38.23 MW
944011 AF1-069 C 80/20 13.85 MW 13.85 MW
959311 AF2-222 C Adder 15.75 MW 13.39 MW
960081 AF2-299 C Adder 2.11 MW 1.8 MW
939181 AE1-148 C Adder 8.76 MW 7.45 MW
941031 AE2-094 C 80/20 42.39 MW 42.39 MW
946281 AF1-292 C Adder 1.62 MW 1.37 MW
957481 AF2-042 C Adder 55.24 MW 46.96 MW
957521 AF2-046 C Adder 16.87 MW 14.34 MW
957861 AF2-080 C Adder 7.82 MW 6.65 MW
938771 AE1-103 C Adder 3.23 MW 2.75 MW
314236 6NRTHEST 80/20 0.19 MW 0.19 MW
314309 6IRON208 80/20 0.46 MW 0.46 MW
314507 3THOMPSN Adder 2.28 MW 1.94 MW
315060 1CHESTF5 Adder 70.54 MW 59.96 MW
315065 1CHESTF6 80/20 22.24 MW 22.24 MW
315073 1STONECA 80/20 7.78 MW 7.78 MW
315076 1HOPPOLC 80/20 1.6 MW 1.6 MW
315077 1HOPHCF1 80/20 2.55 MW 2.55 MW
315078 1HOPHCF2 80/20 2.55 MW 2.55 MW
315079 1HOPHCF3 80/20 2.55 MW 2.55 MW
315080 1HOPHCF4 80/20 3.87 MW 3.87 MW
315083 1SPRUNCA 80/20 10.43 MW 10.43 MW
315084 1SPRUNCB 80/20 10.43 MW 10.43 MW
315092 1YORKTN3 Adder 157.3 MW 133.7 MW
934861 AD1-115 C Adder -3.07 MW -2.61 MW
936591 AD2-074 C Adder 5.87 MW 4.99 MW
942341 AE2-247 C Adder 1.68 MW 1.43 MW
943461 AF1-017 C Adder 1.52 MW 1.29 MW
943741 AF1-042 C Adder 3.07 MW 2.61 MW
944871 AF1-152 C Adder 5.89 MW 5.01 MW
960091 AF2-300 C Adder 2.21 MW 1.88 MW
961951 AG1-038 C Adder 3.39 MW 2.88 MW
966661 AG1-536 C Adder 5.65 MW 4.8 MW
966871 AG1-558 C Adder 2.56 MW 2.18 MW
966881 AG1-559 C Adder 2.45 MW 2.08 MW
315108 1ELIZAR1 80/20 3.36 MW 3.36 MW
315109 1ELIZAR2 80/20 3.3 MW 3.3 MW
315110 1ELIZAR3 80/20 3.4 MW 3.4 MW
315225 1N ANNA1 80/20 52.73 MW 52.73 MW
315226 1N ANNA2 80/20 52.75 MW 52.75 MW
315233 1SURRY 2 80/20 25.95 MW 25.95 MW
315260 1GOSPORTA Adder 2.41 MW 2.05 MW
315261 1GOSPORTB Adder 3.08 MW 2.61 MW
315262 1GOSPORTC Adder 2.61 MW 2.22 MW
957411 AF2-035 C Adder 8.84 MW 7.52 MW
957601 AF2-054 C Adder 2.26 MW 1.93 MW
962861 AG1-135 C Adder 6.38 MW 5.42 MW
962971 AG1-146 C Adder 3.26 MW 2.77 MW
962981 AG1-147 C Adder 7.62 MW 6.47 MW
963051 AG1-154 C Adder 3.52 MW 2.99 MW
963611 AG1-210 C Adder 0.68 MW 0.58 MW
964211 AG1-282 C Adder 2.08 MW 1.77 MW
941501 AE2-147 C Adder 17.68 MW 15.03 MW
942001 AE2-212 C 80/20 2.45 MW 2.45 MW
957871 AF2-081 C Adder 11.23 MW 9.55 MW
958161 AF2-110 C Adder 1.54 MW 1.3 MW
926071 AC1-086 C Adder 21.97 MW 18.68 MW
927021 AC1-189 C Adder 8.61 MW 7.32 MW
936261 AD2-033 C Adder 12.36 MW 10.51 MW
933291 AC2-141 C 80/20 34.43 MW 34.43 MW
934621 AD1-088 C Adder 11.73 MW 9.97 MW
939411 AE1-173 C 80/20 99.94 MW 99.94 MW
934011 AD1-025 C Adder 19.03 MW 16.18 MW
315085 1SPRUNCC 80/20 0.17 MW 0.17 MW
315086 1SPRUNCD 80/20 0.17 MW 0.17 MW
927041 AC1-191 C Adder 10.29 MW 8.75 MW
933981 AD1-022 C Adder 9.46 MW 8.04 MW
961681 AG1-008 C Adder 16.87 MW 14.34 MW
962571 AG1-106 C Adder 3.11 MW 2.64 MW
316210 AC1-098 C Adder 6.34 MW 5.39 MW
316212 AC1-099 C Adder 2.12 MW 1.81 MW
316233 AE1-074 C 80/20 2.87 MW 2.87 MW
316240 AF1-291 C 80/20 2.45 MW 2.45 MW
316257 AC1-043 C Adder -6.13 MW -5.21 MW
316274 AC1-208 C Adder 9.28 MW 7.89 MW
316294 AC1-161 C 80/20 5.21 MW 5.21 MW
316301 AE2-228 C 80/20 2.45 MW 2.45 MW
316304 AE2-227 C 80/20 2.44 MW 2.44 MW
316336 AC2-165 C Adder 10.11 MW 8.59 MW
963221 AG1-171 C Adder 2.42 MW 2.06 MW
963231 AG1-172 C Adder 2.42 MW 2.06 MW
963241 AG1-173 C Adder 2.42 MW 2.06 MW
316427 AG1-213 C Adder 0.74 MW 0.63 MW
316375 AC2-012 C 80/20 1.42 MW 1.42 MW
316311 AC2-079 C Adder 6.46 MW 5.49 MW
316349 AD2-085 C Adder 3.88 MW 3.29 MW
961611 AG1-000B C Adder 17.95 MW 15.26 MW
941591 AE2-156 C 80/20 20.24 MW 20.24 MW
942371 AE2-250 C 80/20 10.99 MW 10.99 MW
944581 AF1-123 C 80/20 51.36 MW 51.36 MW
944591 AF1-124 C 80/20 51.55 MW 51.55 MW
944601 AF1-125 C 80/20 50.57 MW 50.57 MW
944631 AF1-128 C Adder 44.14 MW 37.52 MW
957431 AF2-037 C 80/20 13.66 MW 13.66 MW
957691 AF2-063 C 80/20 21.8 MW 21.8 MW
958261 AF2-120 C Adder 6.56 MW 5.58 MW
962271 AG1-075 C 80/20 18.96 MW 18.96 MW
962491 AG1-098 C Adder 10.56 MW 8.97 MW
964241 AG1-285 C Adder 12.0 MW 10.2 MW
964421 AG1-305 C 80/20 9.15 MW 9.15 MW
965281 AG1-393 C 80/20 2.44 MW 2.44 MW
965601 AG1-428 C Adder 4.87 MW 4.14 MW
965691 AG1-437 C Adder 10.91 MW 9.27 MW
965701 AG1-438 C Adder 10.91 MW 9.27 MW
965711 AG1-439 C Adder 23.98 MW 20.38 MW
965741 AG1-442 C Adder 6.36 MW 5.41 MW
965751 AG1-443 C Adder 6.36 MW 5.41 MW
965761 AG1-444 C Adder 12.79 MW 10.87 MW
965811 AG1-449 C 80/20 24.76 MW 24.76 MW
313764 3SOCKMAN Adder 0.74 MW 0.63 MW
932631 AC2-084 C Adder 6.78 MW 5.76 MW
934321 AD1-056 C Adder 6.39 MW 5.43 MW
934331 AD1-057 C Adder 3.57 MW 3.03 MW
934501 AD1-074 C Adder 36.49 MW 31.02 MW
934511 AD1-075 C Adder 9.12 MW 7.75 MW
935161 AD1-151 C Adder 18.19 MW 15.46 MW
938531 AE1-072 C Adder 19.73 MW 16.77 MW
939191 AE1-149 C 80/20 12.17 MW 12.17 MW
939261 AE1-157 C Adder 14.1 MW 11.98 MW
940431 AE2-027 C 80/20 14.64 MW 14.64 MW
940481 AE2-033 C Adder 17.46 MW 14.84 MW
940541 AE2-040 C Adder 3.11 MW 2.64 MW
940551 AE2-041 C Adder 7.63 MW 6.49 MW
940641 AE2-051 C 80/20 18.93 MW 18.93 MW
941101 AE2-104 C Adder 3.76 MW 3.2 MW
941281 AE2-122 C Adder 32.11 MW 27.29 MW
942191 AE2-231 C Adder 4.86 MW 4.13 MW
943471 AF1-018 C Adder 7.63 MW 6.49 MW
944641 AF1-129 C 80/20 116.0 MW 116.0 MW
316303 AF2-085 80/20 4.44 MW 4.44 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 30.28 MW 30.28 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 23.2 MW 23.2 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 96.71 MW 96.71 MW
NY PJM->LTFIMP_NY CLTF 2.71 MW 2.71 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.31 MW 1.31 MW
WEC LTFEXP_WEC->PJM CLTF 0.65 MW 0.65 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.36 MW 11.36 MW
TVA LTFEXP_TVA->PJM CLTF 6.39 MW 6.39 MW
MEC LTFEXP_MEC->PJM CLTF 4.0 MW 4.0 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.99 MW 7.99 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.25 MW 0.25 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.42 MW 5.42 MW

Details for 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P4-2: 545T552_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
DVP_P4-2: 545T552_SRT-S
CONTINGENCY 'DVP_P4-2: 545T552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314916 CKT 1                /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314934 CKT 1 /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314934 CKT 1 /*8MORRSVL     500.0 - 8SPOTSYL     500.0
END
Breaker AC 109.79 3940.0 C 4325.61 136.95
Elimination
Base Case Details for Eliminated Flowgate 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P4-2: 545T552_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
916042 Z1-036 E Adder 25.72 MW 21.86 MW
938771 AE1-103 C Adder 2.61 MW 2.22 MW
938772 AE1-103 E Adder 3.61 MW 3.07 MW
314229 6MT RD221 50/50 0.11 MW 0.11 MW
314236 6NRTHEST 50/50 0.17 MW 0.17 MW
314331 6POE Adder 1.24 MW 1.05 MW
314507 3THOMPSN Adder 1.85 MW 1.57 MW
314525 6KINGFORK Adder 0.93 MW 0.79 MW
314550 6HICKORY Adder 1.98 MW 1.69 MW
315060 1CHESTF5 Adder 60.29 MW 51.25 MW
315065 1CHESTF6 Adder 18.47 MW 15.7 MW
315067 1DARBY 1 50/50 2.27 MW 2.27 MW
315068 1DARBY 2 50/50 2.27 MW 2.27 MW
315069 1DARBY 3 50/50 2.28 MW 2.28 MW
315070 1DARBY 4 50/50 2.28 MW 2.28 MW
315073 1STONECA Adder 6.51 MW 5.53 MW
315083 1SPRUNCA Adder 8.56 MW 7.28 MW
315084 1SPRUNCB Adder 8.56 MW 7.28 MW
315092 1YORKTN3 Adder 131.38 MW 111.67 MW
925865 AC1-065 E Adder 15.06 MW 12.8 MW
926412 AC1-112 E 50/50 1.08 MW 1.08 MW
926662 AC1-147 E Adder 1.21 MW 1.03 MW
926755 AC1-161 E Adder 11.9 MW 10.11 MW
927226 AC1-216 E Adder 7.22 MW 6.14 MW
934392 AD1-063 E Adder 0.97 MW 0.82 MW
935112 AD1-144 E Adder 0.86 MW 0.73 MW
942152 AE2-227 E Adder 1.38 MW 1.18 MW
942162 AE2-228 E Adder 1.35 MW 1.15 MW
942341 AE2-247 C Adder 1.36 MW 1.16 MW
942342 AE2-247 E Adder 1.88 MW 1.6 MW
943461 AF1-017 C Adder 1.23 MW 1.05 MW
943462 AF1-017 E Adder 2.01 MW 1.71 MW
943612 AF1-032 E Adder 0.84 MW 0.71 MW
944871 AF1-152 C Adder 4.77 MW 4.05 MW
944872 AF1-152 E Adder 3.18 MW 2.7 MW
960091 AF2-300 C Adder 2.07 MW 1.76 MW
960092 AF2-300 E Adder 1.38 MW 1.17 MW
966871 AG1-558 C Adder 2.25 MW 1.91 MW
966872 AG1-558 E Adder 1.13 MW 0.96 MW
966881 AG1-559 C Adder 2.29 MW 1.95 MW
966882 AG1-559 E Adder 1.16 MW 0.98 MW
315225 1N ANNA1 50/50 26.57 MW 26.57 MW
315226 1N ANNA2 50/50 26.58 MW 26.58 MW
315260 1GOSPORTA Adder 1.95 MW 1.66 MW
315261 1GOSPORTB Adder 2.49 MW 2.12 MW
315262 1GOSPORTC Adder 2.11 MW 1.8 MW
316075 AC2-137 C 50/50 0.34 MW 0.34 MW
316076 AC2-137 E 50/50 1.27 MW 1.27 MW
316157 AD2-030 E Adder 1.07 MW 0.91 MW
913392 Y1-086 E Adder 1.99 MW 1.69 MW
916192 Z1-068 E Adder 1.72 MW 1.46 MW
923832 AB2-022 E Adder 1.12 MW 0.95 MW
923842 AB2-024 E Adder 1.63 MW 1.39 MW
923852 AB2-025 E Adder 0.99 MW 0.84 MW
930122 AB1-027 E 50/50 1.33 MW 1.33 MW
938552 AE1-074 E Adder 1.14 MW 0.97 MW
939312 AE1-162 E Adder 1.32 MW 1.12 MW
946262 AF1-291 E Adder 1.35 MW 1.15 MW
957411 AF2-035 C Adder 8.28 MW 7.04 MW
957412 AF2-035 E Adder 4.14 MW 3.52 MW
957492 AF2-043 E Adder 1.29 MW 1.1 MW
957601 AF2-054 C Adder 1.9 MW 1.62 MW
957602 AF2-054 E Adder 1.27 MW 1.08 MW
962962 AG1-145 E Adder 1.36 MW 1.15 MW
963051 AG1-154 C Adder 3.35 MW 2.85 MW
963052 AG1-154 E Adder 5.03 MW 4.28 MW
901082 W1-029 E Adder 28.77 MW 24.46 MW
917122 Z2-027 E Adder 1.21 MW 1.03 MW
925332 AB2-190 E Adder 7.58 MW 6.44 MW
925522 AC1-027 E Adder 1.11 MW 0.94 MW
941501 AE2-147 C Adder 14.31 MW 12.16 MW
941502 AE2-147 E Adder 9.54 MW 8.11 MW
942001 AE2-212 C Adder 2.0 MW 1.7 MW
942002 AE2-212 E Adder 1.34 MW 1.14 MW
957832 AF2-077 E Adder 1.31 MW 1.11 MW
957871 AF2-081 C Adder 9.08 MW 7.72 MW
957872 AF2-081 E Adder 3.89 MW 3.31 MW
958161 AF2-110 C Adder 1.24 MW 1.06 MW
958162 AF2-110 E Adder 1.98 MW 1.68 MW
313811 6ELKO L286 50/50 1.33 MW 1.33 MW
933291 AC2-141 C Adder 27.87 MW 23.69 MW
933292 AC2-141 E Adder 11.9 MW 10.11 MW
939411 AE1-173 C Adder 77.19 MW 65.61 MW
939412 AE1-173 E Adder 51.46 MW 43.74 MW
934011 AD1-025 C Adder 15.79 MW 13.42 MW
934012 AD1-025 E Adder 9.35 MW 7.95 MW
927041 AC1-191 C Adder 9.04 MW 7.68 MW
927042 AC1-191 E Adder 4.5 MW 3.83 MW
313053 6PAPERMILL Adder 6.03 MW 5.12 MW
314632 6AYDLETT TAP Adder 1.23 MW 1.05 MW
316004 AC1-112 C 50/50 0.29 MW 0.29 MW
316160 AE1-175 E Adder 1.12 MW 0.95 MW
316169 AC1-164 GEN 50/50 5.83 MW 5.83 MW
316233 AE1-074 C Adder 2.26 MW 1.92 MW
316240 AF1-291 C Adder 2.02 MW 1.72 MW
316301 AE2-228 C Adder 2.02 MW 1.72 MW
316304 AE2-227 C Adder 2.08 MW 1.76 MW
316312 AB1-027 C 50/50 0.47 MW 0.47 MW
926785 AC1-164_E 50/50 17.29 MW 17.29 MW
934065 AD1-033 E Adder 4.57 MW 3.89 MW
937226 AE2-253 E Adder 5.31 MW 4.52 MW
939612 AE1-191 E Adder 5.14 MW 4.37 MW
963221 AG1-171 C Adder 2.01 MW 1.71 MW
963222 AG1-171 E Adder 1.34 MW 1.14 MW
963231 AG1-172 C Adder 2.01 MW 1.71 MW
963232 AG1-172 E Adder 1.34 MW 1.14 MW
963241 AG1-173 C Adder 2.01 MW 1.71 MW
963242 AG1-173 E Adder 1.34 MW 1.14 MW
315051 AA1-145 CT1 50/50 4.45 MW 4.45 MW
315052 AA1-145 CT2 50/50 4.45 MW 4.45 MW
316427 AG1-213 C Adder 0.69 MW 0.59 MW
315043 1FOUR RIVERA 50/50 2.8 MW 2.8 MW
315044 1FOUR RIVERB 50/50 2.8 MW 2.8 MW
315045 1FOUR RIVERC 50/50 3.42 MW 3.42 MW
315046 1FOUR RIVERD 50/50 2.76 MW 2.76 MW
315047 1FOUR RIVERE 50/50 2.76 MW 2.76 MW
315048 1FOUR RIVERF 50/50 3.37 MW 3.37 MW
919153 AA1-139 E2 Adder 3.71 MW 3.16 MW
919152 AA1-139 E1 Adder 3.71 MW 3.16 MW
924814 AB2-134 E Adder 11.84 MW 10.06 MW
316084 AB2-161 E Adder 5.08 MW 4.31 MW
932046 AC2-012 E Adder 12.0 MW 10.2 MW
316311 AC2-079 C Adder 5.23 MW 4.45 MW
932596 AC2-079 E Adder 8.53 MW 7.25 MW
934146 AD1-041 E Adder 3.21 MW 2.73 MW
934576 AD1-082 E Adder 4.04 MW 3.44 MW
316349 AD2-085 C Adder 3.14 MW 2.67 MW
936666 AD2-085 E Adder 5.12 MW 4.36 MW
961611 AG1-000B C Adder 14.82 MW 12.6 MW
941591 AE2-156 C Adder 16.39 MW 13.93 MW
942371 AE2-250 C Adder 9.04 MW 7.69 MW
942372 AE2-250 E Adder 4.77 MW 4.06 MW
944581 AF1-123 C Adder 41.48 MW 35.26 MW
944582 AF1-123 E Adder 94.98 MW 80.74 MW
944591 AF1-124 C Adder 41.63 MW 35.38 MW
944592 AF1-124 E Adder 95.33 MW 81.03 MW
944601 AF1-125 C Adder 40.84 MW 34.71 MW
944602 AF1-125 E Adder 93.49 MW 79.47 MW
944631 AF1-128 C Adder 37.72 MW 32.06 MW
962271 AG1-075 C Adder 15.61 MW 13.27 MW
962272 AG1-075 E Adder 9.51 MW 8.09 MW
965281 AG1-393 C Adder 2.01 MW 1.71 MW
965282 AG1-393 E Adder 1.34 MW 1.14 MW
935161 AD1-151 C Adder 15.12 MW 12.85 MW
935162 AD1-151 E Adder 10.08 MW 8.57 MW
938531 AE1-072 C Adder 15.96 MW 13.56 MW
938532 AE1-072 E Adder 8.32 MW 7.07 MW
939191 AE1-149 C Adder 9.89 MW 8.41 MW
939192 AE1-149 E Adder 6.6 MW 5.61 MW
939261 AE1-157 C Adder 13.28 MW 11.29 MW
939262 AE1-157 E Adder 7.2 MW 6.12 MW
939602 AE1-190 E Adder 1.28 MW 1.09 MW
940431 AE2-027 C Adder 12.09 MW 10.27 MW
940432 AE2-027 E Adder 8.06 MW 6.85 MW
940481 AE2-033 C Adder 13.77 MW 11.7 MW
940482 AE2-033 E Adder 7.72 MW 6.56 MW
940541 AE2-040 C Adder 2.44 MW 2.08 MW
940551 AE2-041 C Adder 6.47 MW 5.5 MW
940641 AE2-051 C Adder 14.4 MW 12.24 MW
940642 AE2-051 E Adder 9.6 MW 8.16 MW
941101 AE2-104 C Adder 3.05 MW 2.59 MW
941102 AE2-104 E Adder 4.84 MW 4.12 MW
941281 AE2-122 C Adder 25.98 MW 22.08 MW
941282 AE2-122 E Adder 104.84 MW 89.11 MW
942191 AE2-231 C Adder 4.55 MW 3.87 MW
942192 AE2-231 E Adder 3.04 MW 2.58 MW
943471 AF1-018 C Adder 6.47 MW 5.5 MW
944641 AF1-129 C Adder 96.33 MW 81.88 MW
963622 AG1-213 E Adder 0.81 MW 0.69 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 50.75 MW 50.75 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 28.24 MW 28.24 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 86.7 MW 86.7 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 7.1 MW 7.1 MW
NY PJM->LTFIMP_NY CLTF 3.13 MW 3.13 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.0 MW 2.0 MW
WEC LTFEXP_WEC->PJM CLTF 1.04 MW 1.04 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.65 MW 9.65 MW
TVA LTFEXP_TVA->PJM CLTF 7.1 MW 7.1 MW
MEC LTFEXP_MEC->PJM CLTF 5.66 MW 5.66 MW
LAGN LTFEXP_LAGN->PJM CLTF 8.85 MW 8.85 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.37 MW 0.37 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 45.06 MW 45.06 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.61 MW 4.61 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P4-2: 557T574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Breaker AC 126.3 3940.0 C 4976.42 247.29
Elimination
Base Case Details for Eliminated Flowgate 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P4-2: 557T574_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 9.25 MW 9.25 MW
963042 AG1-153 E 50/50 13.88 MW 13.88 MW
314541 3WATKINS Adder 1.1 MW 0.94 MW
920042 AA2-088 E OP Adder 16.75 MW 14.23 MW
942931 AE2-313 C 50/50 59.9 MW 59.9 MW
942932 AE2-313 E 50/50 39.93 MW 39.93 MW
944011 AF1-069 C 50/50 21.73 MW 21.73 MW
944012 AF1-069 E 50/50 8.44 MW 8.44 MW
940492 AE2-034 E Adder 4.93 MW 4.19 MW
941031 AE2-094 C 50/50 66.52 MW 66.52 MW
941032 AE2-094 E 50/50 29.79 MW 29.79 MW
957481 AF2-042 C Adder 85.26 MW 72.47 MW
957482 AF2-042 E Adder 56.84 MW 48.31 MW
314539 3UNCAMP Adder 9.73 MW 8.27 MW
916042 Z1-036 E Adder 46.36 MW 39.4 MW
938771 AE1-103 C Adder 4.7 MW 3.99 MW
938772 AE1-103 E Adder 6.49 MW 5.51 MW
314331 6POE Adder 2.15 MW 1.83 MW
314507 3THOMPSN Adder 3.3 MW 2.81 MW
314525 6KINGFORK Adder 1.64 MW 1.39 MW
314550 6HICKORY 50/50 3.57 MW 3.57 MW
315092 1YORKTN3 Adder 215.56 MW 183.23 MW
926662 AC1-147 E Adder 2.17 MW 1.84 MW
926755 AC1-161 E 50/50 21.5 MW 21.5 MW
927226 AC1-216 E Adder 11.74 MW 9.97 MW
935112 AD1-144 E Adder 1.52 MW 1.29 MW
942341 AE2-247 C Adder 2.4 MW 2.04 MW
942342 AE2-247 E Adder 3.31 MW 2.82 MW
943461 AF1-017 C Adder 2.17 MW 1.84 MW
943462 AF1-017 E Adder 3.54 MW 3.01 MW
943612 AF1-032 E Adder 1.51 MW 1.28 MW
944871 AF1-152 C Adder 8.58 MW 7.29 MW
944872 AF1-152 E Adder 5.72 MW 4.86 MW
315102 1BRUNSWICKG1 50/50 12.66 MW 12.66 MW
315103 1BRUNSWICKG2 50/50 12.66 MW 12.66 MW
315104 1BRUNSWICKG3 50/50 12.66 MW 12.66 MW
315105 1BRUNSWICKS1 50/50 26.3 MW 26.3 MW
315108 1ELIZAR1 50/50 4.86 MW 4.86 MW
315109 1ELIZAR2 50/50 4.78 MW 4.78 MW
315110 1ELIZAR3 50/50 4.93 MW 4.93 MW
315241 1Z1-086 GT1 50/50 16.21 MW 16.21 MW
315242 1Z1-086 GT2 50/50 16.21 MW 16.21 MW
315243 1Z1-086 GT3 50/50 16.21 MW 16.21 MW
315244 1Z1-086 ST 50/50 28.22 MW 28.22 MW
315260 1GOSPORTA Adder 3.49 MW 2.96 MW
315261 1GOSPORTB Adder 4.45 MW 3.79 MW
315262 1GOSPORTC Adder 3.78 MW 3.21 MW
913392 Y1-086 E Adder 3.58 MW 3.04 MW
916192 Z1-068 E 50/50 3.08 MW 3.08 MW
923832 AB2-022 E Adder 2.02 MW 1.72 MW
923852 AB2-025 E Adder 1.85 MW 1.57 MW
938552 AE1-074 E 50/50 2.0 MW 2.0 MW
939312 AE1-162 E Adder 2.28 MW 1.93 MW
957492 AF2-043 E Adder 2.32 MW 1.97 MW
901082 W1-029 E Adder 51.76 MW 44.0 MW
917122 Z2-027 E Adder 2.19 MW 1.86 MW
925522 AC1-027 E 50/50 1.99 MW 1.99 MW
941501 AE2-147 C Adder 25.74 MW 21.88 MW
941502 AE2-147 E Adder 17.16 MW 14.59 MW
942001 AE2-212 C Adder 3.29 MW 2.79 MW
942002 AE2-212 E Adder 2.19 MW 1.86 MW
957871 AF2-081 C Adder 16.34 MW 13.89 MW
957872 AF2-081 E Adder 7.0 MW 5.95 MW
958161 AF2-110 C Adder 2.22 MW 1.89 MW
958162 AF2-110 E Adder 3.53 MW 3.0 MW
933291 AC2-141 C 50/50 50.38 MW 50.38 MW
933292 AC2-141 E 50/50 21.5 MW 21.5 MW
939411 AE1-173 C 50/50 152.85 MW 152.85 MW
939412 AE1-173 E 50/50 101.9 MW 101.9 MW
934011 AD1-025 C Adder 25.65 MW 21.8 MW
934012 AD1-025 E Adder 15.19 MW 12.91 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
314594 6PLYMOUTH TP Adder 0.51 MW 0.44 MW
314632 6AYDLETT TAP Adder 2.21 MW 1.88 MW
316185 AD1-033 C 50/50 1.87 MW 1.87 MW
316233 AE1-074 C 50/50 3.98 MW 3.98 MW
316294 AC1-161 C 50/50 7.63 MW 7.63 MW
316316 AC1-027 C 50/50 0.48 MW 0.48 MW
924516 AB2-100 E1 Adder 4.53 MW 3.85 MW
924517 AB2-100 E2 Adder 4.53 MW 3.85 MW
934065 AD1-033 E 50/50 8.22 MW 8.22 MW
937226 AE2-253 E Adder 9.56 MW 8.12 MW
963221 AG1-171 C Adder 3.27 MW 2.78 MW
963222 AG1-171 E Adder 2.18 MW 1.85 MW
963231 AG1-172 C Adder 3.27 MW 2.78 MW
963232 AG1-172 E Adder 2.18 MW 1.85 MW
963241 AG1-173 C Adder 3.27 MW 2.78 MW
963242 AG1-173 E Adder 2.18 MW 1.85 MW
919153 AA1-139 E2 Adder 6.68 MW 5.68 MW
919152 AA1-139 E1 Adder 6.68 MW 5.68 MW
920692 AA2-178 E Adder 6.58 MW 5.59 MW
924814 AB2-134 E Adder 19.22 MW 16.34 MW
316084 AB2-161 E Adder 8.76 MW 7.45 MW
316375 AC2-012 C 50/50 2.06 MW 2.06 MW
932046 AC2-012 E 50/50 21.45 MW 21.45 MW
316311 AC2-079 C Adder 9.23 MW 7.85 MW
932596 AC2-079 E Adder 15.07 MW 12.81 MW
934576 AD1-082 E Adder 6.98 MW 5.93 MW
316349 AD2-085 C Adder 5.54 MW 4.71 MW
936666 AD2-085 E Adder 9.03 MW 7.68 MW
961611 AG1-000B C Adder 24.67 MW 20.97 MW
941591 AE2-156 C 50/50 29.32 MW 29.32 MW
944581 AF1-123 C 50/50 74.9 MW 74.9 MW
944582 AF1-123 E 50/50 171.51 MW 171.51 MW
944591 AF1-124 C 50/50 75.17 MW 75.17 MW
944592 AF1-124 E 50/50 172.13 MW 172.13 MW
944601 AF1-125 C 50/50 73.75 MW 73.75 MW
944602 AF1-125 E 50/50 168.82 MW 168.82 MW
962271 AG1-075 C Adder 25.12 MW 21.35 MW
962272 AG1-075 E Adder 4.97 MW 4.23 MW
965811 AG1-449 C 50/50 38.79 MW 38.79 MW
934612 AD1-087 E Adder 5.59 MW 4.75 MW
935161 AD1-151 C Adder 24.35 MW 20.7 MW
935162 AD1-151 E Adder 16.23 MW 13.8 MW
937482 AD2-202 E Adder 1.64 MW 1.39 MW
938531 AE1-072 C Adder 28.71 MW 24.4 MW
938532 AE1-072 E Adder 14.96 MW 12.72 MW
939191 AE1-149 C Adder 16.83 MW 14.31 MW
939192 AE1-149 E Adder 11.22 MW 9.54 MW
940481 AE2-033 C Adder 25.74 MW 21.88 MW
940482 AE2-033 E Adder 17.35 MW 14.75 MW
940541 AE2-040 C Adder 4.58 MW 3.89 MW
940641 AE2-051 C 50/50 29.39 MW 29.39 MW
940642 AE2-051 E 50/50 19.6 MW 19.6 MW
941101 AE2-104 C Adder 5.44 MW 4.62 MW
941102 AE2-104 E Adder 8.65 MW 7.35 MW
941281 AE2-122 C 50/50 46.61 MW 46.61 MW
941282 AE2-122 E 50/50 188.08 MW 188.08 MW
316303 AF2-085 50/50 6.56 MW 6.56 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 63.97 MW 63.97 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 40.42 MW 40.42 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 149.53 MW 149.53 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 7.12 MW 7.12 MW
NY PJM->LTFIMP_NY CLTF 3.25 MW 3.25 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.55 MW 2.55 MW
WEC LTFEXP_WEC->PJM CLTF 1.32 MW 1.32 MW
CPLE LTFEXP_CPLE->PJM CLTF 17.43 MW 17.43 MW
TVA LTFEXP_TVA->PJM CLTF 10.59 MW 10.59 MW
MEC LTFEXP_MEC->PJM CLTF 7.57 MW 7.57 MW
LAGN LTFEXP_LAGN->PJM CLTF 13.31 MW 13.31 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.48 MW 0.48 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 45.27 MW 45.27 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.31 MW 8.31 MW

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P4-2: 57602_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P4-2: 57602_SRT-S
CONTINGENCY 'DVP_P4-2: 57602_SRT-S'
 OPEN BRANCH FROM BUS 314232 TO BUS 314918 CKT 1                /*6NO ANNA     230.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314918 TO BUS 314934 CKT 1 /*8NO ANNA     500.0 - 8SPOTSYL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314918 TO BUS 314934 CKT 1 /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Breaker AC 113.73 5011.0 C 5699.19 266.43
Elimination
Base Case Details for Eliminated Flowgate 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P4-2: 57602_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314541 3WATKINS Adder 1.17 MW 0.99 MW
942931 AE2-313 C Adder 39.59 MW 33.65 MW
944011 AF1-069 C Adder 19.54 MW 16.61 MW
944012 AF1-069 E Adder 7.59 MW 6.45 MW
940492 AE2-034 E Adder 5.24 MW 4.45 MW
941031 AE2-094 C Adder 59.82 MW 50.84 MW
941032 AE2-094 E Adder 26.79 MW 22.77 MW
314539 3UNCAMP Adder 10.36 MW 8.8 MW
916042 Z1-036 E Adder 49.63 MW 42.19 MW
938771 AE1-103 C Adder 5.02 MW 4.26 MW
938772 AE1-103 E Adder 6.93 MW 5.89 MW
314229 6MT RD221 50/50 0.2 MW 0.2 MW
314236 6NRTHEST 50/50 0.31 MW 0.31 MW
314331 6POE Adder 2.34 MW 1.99 MW
314507 3THOMPSN Adder 3.59 MW 3.05 MW
314525 6KINGFORK Adder 1.8 MW 1.53 MW
314550 6HICKORY Adder 3.86 MW 3.28 MW
315060 1CHESTF5 50/50 117.0 MW 117.0 MW
315061 1CHESTG7 50/50 6.62 MW 6.62 MW
315062 1CHESTS7 50/50 3.04 MW 3.04 MW
315063 1CHESTG8 50/50 6.51 MW 6.51 MW
315064 1CHESTS8 50/50 3.35 MW 3.35 MW
315065 1CHESTF6 Adder 34.99 MW 29.74 MW
315067 1DARBY 1 50/50 4.34 MW 4.34 MW
315068 1DARBY 2 50/50 4.34 MW 4.34 MW
315069 1DARBY 3 50/50 4.36 MW 4.36 MW
315070 1DARBY 4 50/50 4.37 MW 4.37 MW
315073 1STONECA Adder 12.5 MW 10.63 MW
315083 1SPRUNCA Adder 16.02 MW 13.61 MW
315084 1SPRUNCB Adder 16.02 MW 13.61 MW
315092 1YORKTN3 Adder 258.51 MW 219.74 MW
925865 AC1-065 E Adder 29.09 MW 24.73 MW
926412 AC1-112 E 50/50 2.1 MW 2.1 MW
926662 AC1-147 E Adder 2.36 MW 2.0 MW
926755 AC1-161 E Adder 23.29 MW 19.8 MW
927226 AC1-216 E Adder 13.96 MW 11.86 MW
934392 AD1-063 E Adder 1.88 MW 1.6 MW
935112 AD1-144 E Adder 1.68 MW 1.42 MW
942152 AE2-227 E Adder 2.65 MW 2.25 MW
942162 AE2-228 E Adder 2.55 MW 2.17 MW
942341 AE2-247 C Adder 2.62 MW 2.23 MW
942342 AE2-247 E Adder 3.62 MW 3.08 MW
943461 AF1-017 C Adder 2.37 MW 2.02 MW
943462 AF1-017 E Adder 3.87 MW 3.29 MW
943612 AF1-032 E Adder 1.63 MW 1.39 MW
944871 AF1-152 C Adder 9.22 MW 7.84 MW
944872 AF1-152 E Adder 6.15 MW 5.23 MW
966871 AG1-558 C Adder 4.13 MW 3.51 MW
966872 AG1-558 E Adder 2.08 MW 1.77 MW
315233 1SURRY 2 50/50 42.7 MW 42.7 MW
315260 1GOSPORTA Adder 3.79 MW 3.22 MW
315261 1GOSPORTB Adder 4.84 MW 4.12 MW
315262 1GOSPORTC Adder 4.11 MW 3.49 MW
316075 AC2-137 C 50/50 0.66 MW 0.66 MW
316076 AC2-137 E 50/50 2.51 MW 2.51 MW
316157 AD2-030 E Adder 2.06 MW 1.75 MW
913392 Y1-086 E Adder 3.86 MW 3.28 MW
916192 Z1-068 E Adder 3.34 MW 2.84 MW
923832 AB2-022 E Adder 2.18 MW 1.85 MW
923842 AB2-024 E Adder 3.18 MW 2.7 MW
923852 AB2-025 E Adder 1.86 MW 1.58 MW
930122 AB1-027 E 50/50 2.58 MW 2.58 MW
938552 AE1-074 E Adder 2.08 MW 1.77 MW
939312 AE1-162 E Adder 2.57 MW 2.18 MW
946262 AF1-291 E Adder 2.56 MW 2.17 MW
957492 AF2-043 E Adder 2.51 MW 2.13 MW
957601 AF2-054 C Adder 3.67 MW 3.12 MW
957602 AF2-054 E Adder 2.44 MW 2.08 MW
962962 AG1-145 E 50/50 2.69 MW 2.69 MW
901082 W1-029 E Adder 55.66 MW 47.31 MW
917122 Z2-027 E Adder 2.35 MW 2.0 MW
925332 AB2-190 E Adder 14.6 MW 12.41 MW
925522 AC1-027 E Adder 2.16 MW 1.84 MW
941501 AE2-147 C Adder 27.68 MW 23.52 MW
941502 AE2-147 E Adder 18.45 MW 15.68 MW
942001 AE2-212 C Adder 3.79 MW 3.22 MW
942002 AE2-212 E Adder 2.53 MW 2.15 MW
957832 AF2-077 E Adder 2.55 MW 2.16 MW
957871 AF2-081 C Adder 17.63 MW 14.99 MW
957872 AF2-081 E Adder 7.56 MW 6.42 MW
958161 AF2-110 C Adder 2.4 MW 2.04 MW
958162 AF2-110 E Adder 3.82 MW 3.25 MW
313811 6ELKO L286 50/50 2.61 MW 2.61 MW
933291 AC2-141 C Adder 54.56 MW 46.38 MW
933292 AC2-141 E Adder 23.29 MW 19.8 MW
939411 AE1-173 C Adder 146.86 MW 124.83 MW
939412 AE1-173 E Adder 97.9 MW 83.22 MW
934011 AD1-025 C Adder 30.5 MW 25.93 MW
934012 AD1-025 E Adder 18.07 MW 15.36 MW
927041 AC1-191 C Adder 16.57 MW 14.08 MW
927042 AC1-191 E Adder 8.25 MW 7.01 MW
313053 6PAPERMILL Adder 11.73 MW 9.97 MW
314632 6AYDLETT TAP Adder 2.39 MW 2.03 MW
316004 AC1-112 C 50/50 0.57 MW 0.57 MW
316159 AE1-175 C 50/50 0.68 MW 0.68 MW
316160 AE1-175 E 50/50 2.22 MW 2.22 MW
316169 AC1-164 GEN 50/50 11.65 MW 11.65 MW
316233 AE1-074 C Adder 4.14 MW 3.52 MW
316240 AF1-291 C Adder 3.84 MW 3.26 MW
316301 AE2-228 C Adder 3.83 MW 3.26 MW
316304 AE2-227 C Adder 3.97 MW 3.38 MW
316312 AB1-027 C 50/50 0.91 MW 0.91 MW
316382 AG1-145 C 50/50 0.61 MW 0.61 MW
926785 AC1-164_E 50/50 34.55 MW 34.55 MW
934065 AD1-033 E Adder 8.89 MW 7.55 MW
937226 AE2-253 E Adder 10.32 MW 8.77 MW
939612 AE1-191 E Adder 9.91 MW 8.43 MW
963221 AG1-171 C Adder 3.89 MW 3.3 MW
963222 AG1-171 E Adder 2.59 MW 2.2 MW
963231 AG1-172 C Adder 3.89 MW 3.3 MW
963232 AG1-172 E Adder 2.59 MW 2.2 MW
963241 AG1-173 C Adder 3.89 MW 3.3 MW
963242 AG1-173 E Adder 2.59 MW 2.2 MW
919153 AA1-139 E2 Adder 7.21 MW 6.13 MW
919152 AA1-139 E1 Adder 7.21 MW 6.13 MW
920692 AA2-178 E Adder 6.98 MW 5.94 MW
924814 AB2-134 E Adder 22.86 MW 19.43 MW
316084 AB2-161 E Adder 9.71 MW 8.26 MW
932046 AC2-012 E Adder 23.32 MW 19.82 MW
316311 AC2-079 C Adder 10.08 MW 8.56 MW
932596 AC2-079 E Adder 16.44 MW 13.97 MW
934146 AD1-041 E Adder 6.2 MW 5.27 MW
934576 AD1-082 E Adder 7.74 MW 6.58 MW
316349 AD2-085 C Adder 6.05 MW 5.14 MW
936666 AD2-085 E Adder 9.87 MW 8.39 MW
961611 AG1-000B C Adder 28.72 MW 24.41 MW
941591 AE2-156 C Adder 31.87 MW 27.09 MW
942371 AE2-250 C Adder 17.16 MW 14.59 MW
942372 AE2-250 E Adder 9.06 MW 7.7 MW
944581 AF1-123 C Adder 80.69 MW 68.59 MW
944582 AF1-123 E Adder 184.78 MW 157.06 MW
944591 AF1-124 C Adder 80.98 MW 68.83 MW
944592 AF1-124 E Adder 185.45 MW 157.63 MW
944601 AF1-125 C Adder 79.45 MW 67.53 MW
944602 AF1-125 E Adder 181.88 MW 154.6 MW
944631 AF1-128 C 50/50 73.21 MW 73.21 MW
962271 AG1-075 C Adder 29.62 MW 25.18 MW
962272 AG1-075 E Adder 18.05 MW 15.34 MW
965281 AG1-393 C Adder 3.81 MW 3.24 MW
965282 AG1-393 E Adder 2.54 MW 2.16 MW
935161 AD1-151 C Adder 29.17 MW 24.8 MW
935162 AD1-151 E Adder 19.45 MW 16.53 MW
938531 AE1-072 C Adder 30.97 MW 26.33 MW
938532 AE1-072 E Adder 16.14 MW 13.72 MW
939191 AE1-149 C Adder 18.85 MW 16.02 MW
939192 AE1-149 E Adder 12.57 MW 10.68 MW
939602 AE1-190 E Adder 2.48 MW 2.11 MW
940431 AE2-027 C Adder 22.95 MW 19.5 MW
940432 AE2-027 E Adder 15.3 MW 13.0 MW
940481 AE2-033 C Adder 25.9 MW 22.01 MW
940482 AE2-033 E Adder 17.46 MW 14.84 MW
940541 AE2-040 C Adder 4.6 MW 3.91 MW
940551 AE2-041 C Adder 12.55 MW 10.67 MW
940641 AE2-051 C Adder 27.19 MW 23.11 MW
940642 AE2-051 E Adder 18.13 MW 15.41 MW
941101 AE2-104 C Adder 5.89 MW 5.0 MW
941102 AE2-104 E Adder 9.36 MW 7.96 MW
941281 AE2-122 C Adder 50.5 MW 42.92 MW
941282 AE2-122 E Adder 203.77 MW 173.2 MW
943471 AF1-018 C Adder 12.55 MW 10.67 MW
944641 AF1-129 C Adder 182.49 MW 155.12 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 83.8 MW 83.8 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 48.6 MW 48.6 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 157.5 MW 157.5 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 9.3 MW 9.3 MW
NY PJM->LTFIMP_NY CLTF 4.18 MW 4.18 MW
LGEE LTFEXP_LGEE->PJM CLTF 3.34 MW 3.34 MW
WEC LTFEXP_WEC->PJM CLTF 1.72 MW 1.72 MW
CPLE LTFEXP_CPLE->PJM CLTF 17.72 MW 17.72 MW
TVA LTFEXP_TVA->PJM CLTF 12.41 MW 12.41 MW
MEC LTFEXP_MEC->PJM CLTF 9.53 MW 9.53 MW
LAGN LTFEXP_LAGN->PJM CLTF 15.47 MW 15.47 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.62 MW 0.62 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 59.12 MW 59.12 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.46 MW 8.46 MW

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 122.75 4070.2 B 4996.17 81.01
Elimination
Base Case Details for Eliminated Flowgate 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.83 MW 0.7 MW
962331 AG1-082 C Adder 3.31 MW 2.81 MW
962341 AG1-083 C Adder 3.31 MW 2.81 MW
963041 AG1-153 C Adder 8.39 MW 7.13 MW
964801 AG1-343 C Adder 9.86 MW 8.38 MW
966801 AG1-551 C Adder 3.38 MW 2.88 MW
966811 AG1-552 C Adder 3.24 MW 2.75 MW
965291 AG1-394 C Adder 1.41 MW 1.2 MW
966621 AG1-532 C Adder 2.19 MW 1.86 MW
934521 AD1-076 C Adder 20.56 MW 17.48 MW
942931 AE2-313 C Adder 54.02 MW 45.91 MW
944011 AF1-069 C Adder 19.55 MW 16.62 MW
960081 AF2-299 C Adder 3.16 MW 2.69 MW
941031 AE2-094 C Adder 59.83 MW 50.86 MW
946281 AF1-292 C Adder 2.42 MW 2.05 MW
957481 AF2-042 C Adder 79.1 MW 67.24 MW
957521 AF2-046 C Adder 25.93 MW 22.04 MW
957861 AF2-080 C Adder 12.01 MW 10.21 MW
938771 AE1-103 C Adder 5.02 MW 4.26 MW
314229 6MT RD221 80/20 0.2 MW 0.2 MW
314236 6NRTHEST 80/20 0.31 MW 0.31 MW
314309 6IRON208 80/20 0.75 MW 0.75 MW
314421 6WINCHST 80/20 0.22 MW 0.22 MW
314507 3THOMPSN Adder 3.59 MW 3.05 MW
315060 1CHESTF5 80/20 117.06 MW 117.06 MW
315061 1CHESTG7 80/20 6.62 MW 6.62 MW
315062 1CHESTS7 80/20 3.04 MW 3.04 MW
315063 1CHESTG8 80/20 6.52 MW 6.52 MW
315064 1CHESTS8 80/20 3.35 MW 3.35 MW
315065 1CHESTF6 Adder 35.01 MW 29.76 MW
315067 1DARBY 1 80/20 4.34 MW 4.34 MW
315068 1DARBY 2 80/20 4.35 MW 4.35 MW
315069 1DARBY 3 80/20 4.36 MW 4.36 MW
315070 1DARBY 4 80/20 4.37 MW 4.37 MW
315073 1STONECA 80/20 12.51 MW 12.51 MW
315076 1HOPPOLC 80/20 2.58 MW 2.58 MW
315077 1HOPHCF1 80/20 4.1 MW 4.1 MW
315078 1HOPHCF2 80/20 4.1 MW 4.1 MW
315079 1HOPHCF3 80/20 4.1 MW 4.1 MW
315080 1HOPHCF4 80/20 6.22 MW 6.22 MW
315083 1SPRUNCA Adder 16.02 MW 13.62 MW
315084 1SPRUNCB Adder 16.02 MW 13.62 MW
315092 1YORKTN3 80/20 258.64 MW 258.64 MW
936591 AD2-074 C Adder 8.99 MW 7.64 MW
942341 AE2-247 C Adder 2.62 MW 2.23 MW
943461 AF1-017 C Adder 2.37 MW 2.02 MW
943741 AF1-042 C Adder 4.71 MW 4.0 MW
944871 AF1-152 C Adder 9.23 MW 7.84 MW
961951 AG1-038 C Adder 5.2 MW 4.42 MW
966661 AG1-536 C Adder 8.49 MW 7.22 MW
966871 AG1-558 C Adder 4.13 MW 3.51 MW
315116 1SURRY 1 80/20 41.26 MW 41.26 MW
315119 1GRAVEL3 80/20 4.19 MW 4.19 MW
315120 1GRAVEL4 80/20 4.25 MW 4.25 MW
315122 1GRAVEL6 80/20 4.24 MW 4.24 MW
315233 1SURRY 2 80/20 42.72 MW 42.72 MW
315260 1GOSPORTA Adder 3.79 MW 3.22 MW
315261 1GOSPORTB Adder 4.84 MW 4.12 MW
315262 1GOSPORTC Adder 4.11 MW 3.49 MW
316075 AC2-137 C 80/20 0.66 MW 0.66 MW
316132 AB2-190 C 80/20 7.13 MW 7.13 MW
957601 AF2-054 C Adder 3.67 MW 3.12 MW
962861 AG1-135 C Adder 9.64 MW 8.19 MW
962971 AG1-146 C Adder 5.06 MW 4.3 MW
962981 AG1-147 C Adder 11.8 MW 10.03 MW
963611 AG1-210 C Adder 0.99 MW 0.84 MW
964211 AG1-282 C Adder 3.09 MW 2.63 MW
941501 AE2-147 C Adder 27.69 MW 23.53 MW
942001 AE2-212 C Adder 3.79 MW 3.22 MW
957871 AF2-081 C Adder 17.64 MW 14.99 MW
958161 AF2-110 C Adder 2.4 MW 2.04 MW
926071 AC1-086 C Adder 33.23 MW 28.25 MW
927021 AC1-189 C Adder 13.23 MW 11.24 MW
933291 AC2-141 C 80/20 54.58 MW 54.58 MW
939411 AE1-173 C Adder 146.9 MW 124.87 MW
934011 AD1-025 C 80/20 30.51 MW 30.51 MW
927041 AC1-191 C Adder 16.58 MW 14.09 MW
933981 AD1-022 C Adder 14.65 MW 12.45 MW
961681 AG1-008 C Adder 25.93 MW 22.04 MW
962571 AG1-106 C Adder 4.7 MW 4.0 MW
316004 AC1-112 C 80/20 0.57 MW 0.57 MW
316159 AE1-175 C 80/20 0.68 MW 0.68 MW
316169 AC1-164 GEN 80/20 11.66 MW 11.66 MW
316210 AC1-098 C Adder 9.68 MW 8.23 MW
316212 AC1-099 C Adder 3.24 MW 2.76 MW
316233 AE1-074 C Adder 4.14 MW 3.52 MW
316240 AF1-291 C Adder 3.84 MW 3.26 MW
316274 AC1-208 C Adder 14.14 MW 12.02 MW
316294 AC1-161 C 80/20 8.27 MW 8.27 MW
316301 AE2-228 C Adder 3.83 MW 3.26 MW
316304 AE2-227 C 80/20 3.97 MW 3.97 MW
316312 AB1-027 C 80/20 0.91 MW 0.91 MW
316336 AC2-165 C Adder 13.93 MW 11.84 MW
316369 AC1-216 C 80/20 2.69 MW 2.69 MW
316382 AG1-145 C 80/20 0.61 MW 0.61 MW
963221 AG1-171 C 80/20 3.89 MW 3.89 MW
963231 AG1-172 C 80/20 3.89 MW 3.89 MW
963241 AG1-173 C 80/20 3.89 MW 3.89 MW
316033 AB2-134 GEN 80/20 3.52 MW 3.52 MW
316311 AC2-079 C Adder 10.08 MW 8.57 MW
316349 AD2-085 C Adder 6.05 MW 5.14 MW
961611 AG1-000B C 80/20 28.73 MW 28.73 MW
941591 AE2-156 C Adder 31.88 MW 27.1 MW
942371 AE2-250 C Adder 17.17 MW 14.59 MW
944581 AF1-123 C Adder 80.73 MW 68.62 MW
944591 AF1-124 C Adder 81.01 MW 68.86 MW
944601 AF1-125 C Adder 79.48 MW 67.56 MW
944631 AF1-128 C 80/20 73.25 MW 73.25 MW
958261 AF2-120 C Adder 9.87 MW 8.39 MW
962271 AG1-075 C Adder 29.63 MW 25.19 MW
965281 AG1-393 C Adder 3.82 MW 3.24 MW
965601 AG1-428 C Adder 7.23 MW 6.15 MW
965691 AG1-437 C Adder 16.88 MW 14.34 MW
965701 AG1-438 C Adder 16.88 MW 14.34 MW
965711 AG1-439 C Adder 36.79 MW 31.27 MW
965741 AG1-442 C Adder 9.84 MW 8.37 MW
965751 AG1-443 C Adder 9.84 MW 8.37 MW
965761 AG1-444 C Adder 19.62 MW 16.68 MW
965811 AG1-449 C Adder 34.98 MW 29.73 MW
313764 3SOCKMAN Adder 1.12 MW 0.95 MW
932631 AC2-084 C Adder 10.35 MW 8.8 MW
934321 AD1-056 C Adder 9.73 MW 8.27 MW
934331 AD1-057 C Adder 5.43 MW 4.61 MW
934501 AD1-074 C Adder 56.62 MW 48.13 MW
934511 AD1-075 C Adder 14.16 MW 12.03 MW
935161 AD1-151 C 80/20 29.19 MW 29.19 MW
938531 AE1-072 C Adder 30.98 MW 26.34 MW
939191 AE1-149 C Adder 18.86 MW 16.03 MW
940431 AE2-027 C Adder 22.96 MW 19.51 MW
940481 AE2-033 C Adder 25.9 MW 22.02 MW
940541 AE2-040 C Adder 4.6 MW 3.91 MW
940551 AE2-041 C Adder 12.56 MW 10.68 MW
940641 AE2-051 C Adder 27.2 MW 23.12 MW
941101 AE2-104 C Adder 5.89 MW 5.01 MW
941281 AE2-122 C Adder 50.52 MW 42.94 MW
943471 AF1-018 C Adder 12.56 MW 10.68 MW
944641 AF1-129 C Adder 182.58 MW 155.19 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 83.73 MW 83.73 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 48.58 MW 48.58 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 157.47 MW 157.47 MW
NY PJM->LTFIMP_NY CLTF 4.17 MW 4.17 MW
LGEE LTFEXP_LGEE->PJM CLTF 3.34 MW 3.34 MW
WEC LTFEXP_WEC->PJM CLTF 1.72 MW 1.72 MW
CPLE LTFEXP_CPLE->PJM CLTF 17.72 MW 17.72 MW
TVA LTFEXP_TVA->PJM CLTF 12.4 MW 12.4 MW
MEC LTFEXP_MEC->PJM CLTF 9.52 MW 9.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 15.46 MW 15.46 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.62 MW 0.62 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.46 MW 8.46 MW

Details for 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 112.19 1058.16 B 1187.18 19.2
Elimination
Base Case Details for Eliminated Flowgate 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.41 MW 0.35 MW
961941 AG1-037 C Adder 0.21 MW 0.18 MW
962331 AG1-082 C Adder 0.83 MW 0.71 MW
962341 AG1-083 C Adder 0.83 MW 0.71 MW
963041 AG1-153 C 80/20 3.73 MW 3.73 MW
964791 AG1-342 C Adder 1.33 MW 1.13 MW
964801 AG1-343 C Adder 2.41 MW 2.04 MW
966801 AG1-551 C Adder 0.9 MW 0.76 MW
966811 AG1-552 C Adder 0.84 MW 0.72 MW
965291 AG1-394 C Adder 0.34 MW 0.29 MW
966621 AG1-532 C Adder 0.57 MW 0.48 MW
315131 1EDGECMA Adder 6.79 MW 5.77 MW
315136 1ROSEMG1 80/20 0.8 MW 0.8 MW
315137 1ROSEMS1 80/20 0.49 MW 0.49 MW
315138 1ROSEMG2 80/20 0.37 MW 0.37 MW
315139 1GASTONA 80/20 1.19 MW 1.19 MW
315153 1CLOVER1 80/20 6.19 MW 6.19 MW
315154 1CLOVER2 80/20 6.13 MW 6.13 MW
934521 AD1-076 C Adder 5.07 MW 4.31 MW
942931 AE2-313 C 80/20 24.36 MW 24.36 MW
944011 AF1-069 C 80/20 8.95 MW 8.95 MW
960061 AF2-297 C Adder 3.28 MW 2.79 MW
960081 AF2-299 C Adder 0.82 MW 0.7 MW
939181 AE1-148 C Adder 3.3 MW 2.81 MW
940491 AE2-034 C 80/20 0.44 MW 0.44 MW
941011 AE2-092 C Adder -4.78 MW -4.07 MW
941031 AE2-094 C 80/20 27.39 MW 27.39 MW
946281 AF1-292 C Adder 0.63 MW 0.53 MW
957481 AF2-042 C 80/20 30.33 MW 30.33 MW
957521 AF2-046 C Adder 6.42 MW 5.46 MW
957861 AF2-080 C Adder 3.3 MW 2.81 MW
938771 AE1-103 C Adder 1.14 MW 0.97 MW
313526 AB2-022 C 80/20 0.14 MW 0.14 MW
314507 3THOMPSN Adder 0.79 MW 0.67 MW
942341 AE2-247 C Adder 0.49 MW 0.42 MW
943461 AF1-017 C Adder 0.44 MW 0.38 MW
944871 AF1-152 C 80/20 2.14 MW 2.14 MW
315098 1CHESPKA 80/20 0.16 MW 0.16 MW
315099 1CHESPKB 80/20 0.26 MW 0.26 MW
315102 1BRUNSWICKG1 80/20 5.1 MW 5.1 MW
315103 1BRUNSWICKG2 80/20 5.1 MW 5.1 MW
315104 1BRUNSWICKG3 80/20 5.1 MW 5.1 MW
315105 1BRUNSWICKS1 80/20 10.59 MW 10.59 MW
315108 1ELIZAR1 80/20 1.18 MW 1.18 MW
315109 1ELIZAR2 80/20 1.16 MW 1.16 MW
315110 1ELIZAR3 80/20 1.19 MW 1.19 MW
315141 1GASTONB 80/20 1.19 MW 1.19 MW
315241 1Z1-086 GT1 80/20 6.58 MW 6.58 MW
315242 1Z1-086 GT2 80/20 6.57 MW 6.57 MW
315243 1Z1-086 GT3 80/20 6.57 MW 6.57 MW
315244 1Z1-086 ST 80/20 11.45 MW 11.45 MW
315260 1GOSPORTA 80/20 0.84 MW 0.84 MW
315261 1GOSPORTB 80/20 1.07 MW 1.07 MW
315262 1GOSPORTC 80/20 0.91 MW 0.91 MW
315605 6W1-029WIND 80/20 0.29 MW 0.29 MW
315611 6Z1-036WIND 80/20 0.25 MW 0.25 MW
941501 AE2-147 C 80/20 6.42 MW 6.42 MW
957871 AF2-081 C 80/20 4.07 MW 4.07 MW
958161 AF2-110 C Adder 0.52 MW 0.44 MW
926071 AC1-086 C 80/20 8.84 MW 8.84 MW
927021 AC1-189 C Adder 3.64 MW 3.09 MW
933291 AC2-141 C 80/20 13.27 MW 13.27 MW
939411 AE1-173 C 80/20 55.08 MW 55.08 MW
916191 Z1-068 C 80/20 0.02 MW 0.02 MW
933981 AD1-022 C Adder 3.63 MW 3.09 MW
960331 AF2-324 C Adder 3.06 MW 2.6 MW
961681 AG1-008 C Adder 6.42 MW 5.46 MW
962571 AG1-106 C 80/20 1.25 MW 1.25 MW
316011 AB1-132 C OP 80/20 0.91 MW 0.91 MW
316023 AB2-100 C2 80/20 0.38 MW 0.38 MW
316036 AC1-147 C 80/20 0.13 MW 0.13 MW
316185 AD1-033 C 80/20 0.46 MW 0.46 MW
316210 AC1-098 C Adder 2.59 MW 2.2 MW
316212 AC1-099 C Adder 0.87 MW 0.74 MW
316222 AC1-221 C 80/20 0.61 MW 0.61 MW
316246 AF1-032 C 80/20 0.1 MW 0.1 MW
316263 AC1-034 C Adder 2.9 MW 2.46 MW
316274 AC1-208 C Adder 3.8 MW 3.23 MW
316294 AC1-161 C 80/20 2.01 MW 2.01 MW
316304 AE2-227 C Adder -0.78 MW -0.67 MW
316305 AF2-043 C 80/20 0.13 MW 0.13 MW
316315 AB2-025 C 80/20 0.16 MW 0.16 MW
316316 AC1-027 C 80/20 0.12 MW 0.12 MW
316320 Y1-086 C 80/20 0.08 MW 0.08 MW
316321 Z2-027 C 80/20 0.14 MW 0.14 MW
316336 AC2-165 C Adder -11.15 MW -9.47 MW
316365 AB2-100 C1 80/20 0.38 MW 0.38 MW
316017 AA1-139 ULT1 80/20 0.41 MW 0.41 MW
316018 AA1-139 ULT2 80/20 0.41 MW 0.41 MW
315614 AA2-178 C 80/20 0.6 MW 0.6 MW
316375 AC2-012 C 80/20 0.49 MW 0.49 MW
316311 AC2-079 C Adder 1.93 MW 1.64 MW
316349 AD2-085 C Adder 1.13 MW 0.96 MW
316388 AE2-253 GEN 80/20 0.74 MW 0.74 MW
941591 AE2-156 C 80/20 7.06 MW 7.06 MW
944581 AF1-123 C 80/20 19.13 MW 19.13 MW
944591 AF1-124 C 80/20 19.2 MW 19.2 MW
944601 AF1-125 C 80/20 18.83 MW 18.83 MW
962561 AG1-105 C Adder 3.24 MW 2.75 MW
965601 AG1-428 C Adder 1.78 MW 1.51 MW
965691 AG1-437 C Adder 4.2 MW 3.57 MW
965701 AG1-438 C Adder 4.2 MW 3.57 MW
965711 AG1-439 C Adder 10.21 MW 8.68 MW
965741 AG1-442 C Adder 2.45 MW 2.08 MW
965751 AG1-443 C Adder 2.45 MW 2.08 MW
965761 AG1-444 C Adder 5.45 MW 4.63 MW
965811 AG1-449 C 80/20 15.78 MW 15.78 MW
313764 3SOCKMAN Adder 0.29 MW 0.25 MW
932631 AC2-084 C Adder 2.76 MW 2.35 MW
934321 AD1-056 C Adder 2.7 MW 2.29 MW
934331 AD1-057 C Adder 1.5 MW 1.28 MW
934501 AD1-074 C Adder 13.96 MW 11.87 MW
934511 AD1-075 C Adder 3.49 MW 2.97 MW
934611 AD1-087 C 80/20 0.61 MW 0.61 MW
935171 AD1-152 C 80/20 0.62 MW 0.62 MW
936161 AD2-022 C Adder 3.2 MW 2.72 MW
936171 AD2-023 C Adder 1.87 MW 1.59 MW
937481 AD2-202 C 80/20 0.18 MW 0.18 MW
938531 AE1-072 C 80/20 7.16 MW 7.16 MW
938821 AE1-108 C Adder -4.9 MW -4.16 MW
940481 AE2-033 C 80/20 6.96 MW 6.96 MW
940541 AE2-040 C 80/20 1.24 MW 1.24 MW
940641 AE2-051 C 80/20 11.56 MW 11.56 MW
941101 AE2-104 C Adder 1.28 MW 1.08 MW
941281 AE2-122 C 80/20 11.42 MW 11.42 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 14.34 MW 14.34 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.29 MW 10.29 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 45.66 MW 45.66 MW
NY PJM->LTFIMP_NY CLTF 0.57 MW 0.57 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.56 MW 0.56 MW
WEC LTFEXP_WEC->PJM CLTF 0.3 MW 0.3 MW
CPLE LTFEXP_CPLE->PJM CLTF 5.53 MW 5.53 MW
TVA LTFEXP_TVA->PJM CLTF 2.79 MW 2.79 MW
MEC LTFEXP_MEC->PJM CLTF 1.8 MW 1.8 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.56 MW 3.56 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.11 MW 0.11 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.64 MW 2.64 MW

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Single AC 130.95 3220.44 B 4217.23 50.47
Elimination
Base Case Details for Eliminated Flowgate 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.53 MW 0.45 MW
962331 AG1-082 C Adder 2.11 MW 1.79 MW
962341 AG1-083 C Adder 2.11 MW 1.79 MW
963041 AG1-153 C Adder 5.79 MW 4.92 MW
964801 AG1-343 C Adder 6.28 MW 5.34 MW
966801 AG1-551 C Adder 2.15 MW 1.82 MW
966811 AG1-552 C Adder 2.1 MW 1.78 MW
965291 AG1-394 C Adder 0.9 MW 0.76 MW
965591 AG1-427 C Adder 11.23 MW 9.55 MW
966621 AG1-532 C Adder 1.43 MW 1.22 MW
934521 AD1-076 C Adder 12.98 MW 11.03 MW
942931 AE2-313 C 80/20 37.43 MW 37.43 MW
944011 AF1-069 C 80/20 13.56 MW 13.56 MW
960081 AF2-299 C Adder 2.07 MW 1.76 MW
939181 AE1-148 C Adder 8.61 MW 7.32 MW
941031 AE2-094 C 80/20 41.49 MW 41.49 MW
946281 AF1-292 C Adder 1.58 MW 1.34 MW
957481 AF2-042 C Adder 54.17 MW 46.05 MW
957521 AF2-046 C Adder 16.52 MW 14.04 MW
957861 AF2-080 C Adder 7.65 MW 6.5 MW
938771 AE1-103 C Adder 3.16 MW 2.69 MW
314236 6NRTHEST 80/20 0.19 MW 0.19 MW
314309 6IRON208 80/20 0.45 MW 0.45 MW
314507 3THOMPSN Adder 2.23 MW 1.9 MW
315060 1CHESTF5 Adder 69.1 MW 58.73 MW
315065 1CHESTF6 80/20 21.79 MW 21.79 MW
315073 1STONECA 80/20 7.62 MW 7.62 MW
315076 1HOPPOLC 80/20 1.57 MW 1.57 MW
315077 1HOPHCF1 80/20 2.49 MW 2.49 MW
315078 1HOPHCF2 80/20 2.49 MW 2.49 MW
315079 1HOPHCF3 80/20 2.49 MW 2.49 MW
315080 1HOPHCF4 80/20 3.79 MW 3.79 MW
315083 1SPRUNCA 80/20 10.22 MW 10.22 MW
315084 1SPRUNCB 80/20 10.22 MW 10.22 MW
315092 1YORKTN3 Adder 154.01 MW 130.91 MW
936591 AD2-074 C Adder 5.74 MW 4.88 MW
942341 AE2-247 C Adder 1.64 MW 1.4 MW
943461 AF1-017 C Adder 1.49 MW 1.26 MW
943741 AF1-042 C Adder 3.0 MW 2.55 MW
944871 AF1-152 C Adder 5.77 MW 4.9 MW
960091 AF2-300 C Adder 2.16 MW 1.84 MW
961951 AG1-038 C Adder 3.32 MW 2.82 MW
966661 AG1-536 C Adder 5.52 MW 4.69 MW
966871 AG1-558 C Adder 2.51 MW 2.13 MW
966881 AG1-559 C Adder 2.4 MW 2.04 MW
315108 1ELIZAR1 80/20 3.29 MW 3.29 MW
315109 1ELIZAR2 80/20 3.23 MW 3.23 MW
315110 1ELIZAR3 80/20 3.33 MW 3.33 MW
315225 1N ANNA1 80/20 51.45 MW 51.45 MW
315226 1N ANNA2 80/20 51.46 MW 51.46 MW
315233 1SURRY 2 80/20 25.41 MW 25.41 MW
315260 1GOSPORTA Adder 2.36 MW 2.0 MW
315261 1GOSPORTB Adder 3.01 MW 2.56 MW
315262 1GOSPORTC Adder 2.56 MW 2.17 MW
957411 AF2-035 C Adder 8.64 MW 7.35 MW
957601 AF2-054 C Adder 2.22 MW 1.88 MW
962861 AG1-135 C Adder 6.24 MW 5.3 MW
962971 AG1-146 C Adder 3.19 MW 2.71 MW
962981 AG1-147 C Adder 7.45 MW 6.33 MW
963051 AG1-154 C Adder 3.43 MW 2.92 MW
963611 AG1-210 C Adder 0.67 MW 0.57 MW
964211 AG1-282 C Adder 2.04 MW 1.73 MW
941501 AE2-147 C Adder 17.31 MW 14.71 MW
942001 AE2-212 C 80/20 2.4 MW 2.4 MW
957871 AF2-081 C Adder 11.0 MW 9.35 MW
958161 AF2-110 C Adder 1.5 MW 1.28 MW
966331 AG1-502 C Adder 10.98 MW 9.33 MW
966341 AG1-503 C Adder 2.75 MW 2.33 MW
926071 AC1-086 C Adder 21.52 MW 18.29 MW
927021 AC1-189 C Adder 8.42 MW 7.16 MW
933291 AC2-141 C 80/20 33.71 MW 33.71 MW
934621 AD1-088 C Adder 11.59 MW 9.86 MW
939411 AE1-173 C 80/20 97.84 MW 97.84 MW
934011 AD1-025 C Adder 18.64 MW 15.84 MW
315085 1SPRUNCC 80/20 0.17 MW 0.17 MW
315086 1SPRUNCD 80/20 0.17 MW 0.17 MW
927041 AC1-191 C Adder 10.08 MW 8.56 MW
933981 AD1-022 C Adder 9.26 MW 7.87 MW
961681 AG1-008 C Adder 16.52 MW 14.04 MW
962571 AG1-106 C Adder 3.04 MW 2.59 MW
316164 AC1-076_C 80/20 0.92 MW 0.92 MW
316192 AB2-158 C 80/20 1.97 MW 1.97 MW
316210 AC1-098 C Adder 6.21 MW 5.28 MW
316212 AC1-099 C Adder 2.08 MW 1.77 MW
316233 AE1-074 C 80/20 2.82 MW 2.82 MW
316240 AF1-291 C 80/20 2.4 MW 2.4 MW
316274 AC1-208 C Adder 9.09 MW 7.73 MW
316294 AC1-161 C 80/20 5.11 MW 5.11 MW
316301 AE2-228 C 80/20 2.4 MW 2.4 MW
316304 AE2-227 C 80/20 2.39 MW 2.39 MW
316336 AC2-165 C Adder 10.04 MW 8.54 MW
963221 AG1-171 C Adder 2.37 MW 2.02 MW
963231 AG1-172 C Adder 2.37 MW 2.02 MW
963241 AG1-173 C Adder 2.37 MW 2.02 MW
316427 AG1-213 C Adder 0.72 MW 0.61 MW
316044 AC1-158 C1 80/20 13.95 MW 13.95 MW
316045 AC1-158 C2 80/20 13.95 MW 13.95 MW
316375 AC2-012 C 80/20 1.39 MW 1.39 MW
316311 AC2-079 C Adder 6.32 MW 5.37 MW
316349 AD2-085 C Adder 3.8 MW 3.23 MW
961611 AG1-000B C Adder 17.58 MW 14.94 MW
941591 AE2-156 C 80/20 19.82 MW 19.82 MW
942371 AE2-250 C 80/20 10.76 MW 10.76 MW
944581 AF1-123 C 80/20 50.29 MW 50.29 MW
944591 AF1-124 C 80/20 50.47 MW 50.47 MW
944601 AF1-125 C 80/20 49.51 MW 49.51 MW
944631 AF1-128 C Adder 43.24 MW 36.75 MW
957431 AF2-037 C 80/20 14.37 MW 14.37 MW
957691 AF2-063 C 80/20 22.93 MW 22.93 MW
958261 AF2-120 C Adder 6.42 MW 5.45 MW
962271 AG1-075 C 80/20 18.57 MW 18.57 MW
962491 AG1-098 C Adder 10.44 MW 8.87 MW
964241 AG1-285 C Adder 11.83 MW 10.06 MW
964421 AG1-305 C 80/20 9.63 MW 9.63 MW
965281 AG1-393 C 80/20 2.39 MW 2.39 MW
965601 AG1-428 C Adder 4.78 MW 4.06 MW
965691 AG1-437 C Adder 10.68 MW 9.07 MW
965701 AG1-438 C Adder 10.68 MW 9.07 MW
965741 AG1-442 C Adder 6.23 MW 5.29 MW
965751 AG1-443 C Adder 6.23 MW 5.29 MW
965811 AG1-449 C 80/20 24.24 MW 24.24 MW
313764 3SOCKMAN Adder 0.73 MW 0.62 MW
932631 AC2-084 C Adder 6.64 MW 5.64 MW
934321 AD1-056 C Adder 6.26 MW 5.32 MW
934331 AD1-057 C Adder 3.49 MW 2.97 MW
934501 AD1-074 C Adder 35.73 MW 30.37 MW
934511 AD1-075 C Adder 8.93 MW 7.59 MW
935161 AD1-151 C Adder 17.82 MW 15.14 MW
938531 AE1-072 C Adder 19.32 MW 16.42 MW
939191 AE1-149 C 80/20 11.92 MW 11.92 MW
939261 AE1-157 C Adder 13.77 MW 11.7 MW
940431 AE2-027 C 80/20 14.34 MW 14.34 MW
940481 AE2-033 C Adder 17.1 MW 14.54 MW
940541 AE2-040 C Adder 3.04 MW 2.58 MW
940551 AE2-041 C Adder 7.47 MW 6.35 MW
940641 AE2-051 C 80/20 18.53 MW 18.53 MW
941101 AE2-104 C Adder 3.68 MW 3.13 MW
941281 AE2-122 C Adder 31.44 MW 26.72 MW
942191 AE2-231 C Adder 4.75 MW 4.04 MW
943471 AF1-018 C Adder 7.47 MW 6.35 MW
944641 AF1-129 C 80/20 113.62 MW 113.62 MW
316303 AF2-085 80/20 4.36 MW 4.36 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 27.17 MW 27.17 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 21.92 MW 21.92 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 94.14 MW 94.14 MW
NY PJM->LTFIMP_NY CLTF 2.82 MW 2.82 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.21 MW 1.21 MW
WEC LTFEXP_WEC->PJM CLTF 0.58 MW 0.58 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.1 MW 11.1 MW
TVA LTFEXP_TVA->PJM CLTF 6.11 MW 6.11 MW
MEC LTFEXP_MEC->PJM CLTF 3.7 MW 3.7 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.64 MW 7.64 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.23 MW 0.23 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.29 MW 5.29 MW

Details for 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P4-2: H1T594_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P4-2: H1T594_SRT-S
CONTINGENCY 'DVP_P4-2: H1T594_SRT-S'
 OPEN BRANCH FROM BUS 314063 TO BUS 314916 CKT 1                /*6MORRSVL     230.0 - 8MORRSVL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 OPEN BUS 314897                                                /*8MORRS_1     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Breaker AC 113.7 3940.0 C 4479.66 105.97
Elimination
Base Case Details for Eliminated Flowgate 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P4-2: H1T594_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C Adder 1.56 MW 1.32 MW
961792 AG1-021 E Adder 1.04 MW 0.88 MW
963041 AG1-153 C Adder 5.16 MW 4.38 MW
963042 AG1-153 E Adder 7.73 MW 6.57 MW
963171 AG1-166 C Adder 0.78 MW 0.66 MW
963172 AG1-166 E Adder 1.82 MW 1.54 MW
963181 AG1-167 C Adder 0.58 MW 0.5 MW
963182 AG1-167 E Adder 1.36 MW 1.16 MW
963191 AG1-168 C Adder 0.58 MW 0.5 MW
963192 AG1-168 E Adder 1.36 MW 1.16 MW
963201 AG1-169 C Adder 0.58 MW 0.5 MW
963202 AG1-169 E Adder 1.36 MW 1.16 MW
963211 AG1-170 C Adder 0.39 MW 0.33 MW
963212 AG1-170 E Adder 0.91 MW 0.77 MW
964111 AG1-272 C Adder 0.78 MW 0.67 MW
964112 AG1-272 E Adder 1.83 MW 1.55 MW
964121 AG1-273 C Adder 0.78 MW 0.67 MW
964122 AG1-273 E Adder 1.83 MW 1.55 MW
964131 AG1-274 C Adder 0.78 MW 0.67 MW
964132 AG1-274 E Adder 1.83 MW 1.55 MW
964791 AG1-342 C Adder 2.76 MW 2.35 MW
964792 AG1-342 E Adder 1.84 MW 1.57 MW
964801 AG1-343 C Adder 4.4 MW 3.74 MW
964802 AG1-343 E Adder 3.46 MW 2.94 MW
966811 AG1-552 C Adder 1.56 MW 1.33 MW
966812 AG1-552 E Adder 0.74 MW 0.63 MW
965191 AG1-384 C Adder 0.78 MW 0.67 MW
965192 AG1-384 E Adder 1.83 MW 1.55 MW
965291 AG1-394 C Adder 0.63 MW 0.54 MW
965292 AG1-394 E Adder 1.16 MW 0.98 MW
965591 AG1-427 C Adder 9.34 MW 7.94 MW
965592 AG1-427 E Adder 6.22 MW 5.29 MW
966621 AG1-532 C Adder 1.09 MW 0.92 MW
966622 AG1-532 E Adder 0.72 MW 0.62 MW
313853 3PONTONDP Adder 0.52 MW 0.44 MW
314541 3WATKINS Adder 0.5 MW 0.43 MW
314572 3EMPORIA Adder 0.33 MW 0.28 MW
314713 3PAMPLIN Adder 0.77 MW 0.66 MW
918492 AA1-063AE OP Adder 3.07 MW 2.61 MW
919692 AA2-053 E OP Adder 3.2 MW 2.72 MW
920042 AA2-088 E OP Adder 7.8 MW 6.63 MW
925785 AC1-054 E Adder 2.66 MW 2.26 MW
926274 AC1-105 E Adder 2.09 MW 1.78 MW
942931 AE2-313 C Adder 33.52 MW 28.49 MW
942932 AE2-313 E Adder 22.34 MW 18.99 MW
943902 AF1-058 E Adder 1.0 MW 0.85 MW
944011 AF1-069 C 50/50 12.16 MW 12.16 MW
944012 AF1-069 E 50/50 4.72 MW 4.72 MW
958801 AF2-171 C Adder 11.67 MW 9.92 MW
958802 AF2-171 E Adder 7.78 MW 6.62 MW
959311 AF2-222 C Adder 13.04 MW 11.09 MW
959312 AF2-222 E Adder 8.74 MW 7.43 MW
960061 AF2-297 C Adder 6.02 MW 5.12 MW
960062 AF2-297 E Adder 4.01 MW 3.41 MW
960081 AF2-299 C Adder 1.57 MW 1.33 MW
960082 AF2-299 E Adder 1.05 MW 0.89 MW
900672 V4-068 E Adder 0.26 MW 0.22 MW
923263 AB1-132 E OP Adder 4.64 MW 3.95 MW
923573 AB1-173 E OP Adder 2.52 MW 2.14 MW
924162 AB2-060 E OP Adder 3.37 MW 2.86 MW
924302 AB2-077 E O1 Adder 1.05 MW 0.89 MW
924312 AB2-078 E O1 Adder 1.05 MW 0.89 MW
924322 AB2-079 E O1 Adder 1.05 MW 0.89 MW
925612 AC1-036 E Adder 0.67 MW 0.57 MW
938371 AE1-056 C Adder 5.02 MW 4.27 MW
938372 AE1-056 E Adder 2.74 MW 2.33 MW
939181 AE1-148 C Adder 7.09 MW 6.03 MW
939182 AE1-148 E Adder 4.73 MW 4.02 MW
941031 AE2-094 C 50/50 37.21 MW 37.21 MW
941032 AE2-094 E 50/50 16.67 MW 16.67 MW
946281 AF1-292 C Adder 1.2 MW 1.02 MW
946282 AF1-292 E Adder 0.8 MW 0.68 MW
946301 AF1-294 C Adder 3.19 MW 2.71 MW
946302 AF1-294 E Adder 2.13 MW 1.81 MW
957481 AF2-042 C Adder 47.59 MW 40.45 MW
957482 AF2-042 E Adder 31.73 MW 26.97 MW
957521 AF2-046 C Adder 11.61 MW 9.87 MW
957522 AF2-046 E Adder 5.87 MW 4.99 MW
958211 AF2-115 C Adder 1.95 MW 1.65 MW
958212 AF2-115 E Adder 1.3 MW 1.1 MW
314539 3UNCAMP Adder 4.38 MW 3.72 MW
938771 AE1-103 C Adder 2.1 MW 1.78 MW
938772 AE1-103 E Adder 2.9 MW 2.46 MW
933502 AC2-165 E Adder 6.63 MW 5.63 MW
314331 6POE Adder 0.98 MW 0.83 MW
314550 6HICKORY Adder 1.53 MW 1.3 MW
926755 AC1-161 E Adder 9.02 MW 7.67 MW
934861 AD1-115 C 50/50 3.52 MW 3.52 MW
934862 AD1-115 E 50/50 5.74 MW 5.74 MW
943612 AF1-032 E Adder 0.65 MW 0.55 MW
958502 AF2-144 E Adder 1.1 MW 0.94 MW
315172 1LOISA A 50/50 3.19 MW 3.19 MW
315173 1LOISA B 50/50 3.21 MW 3.21 MW
315174 1LOISA C 50/50 3.21 MW 3.21 MW
315175 1LOISA D 50/50 3.21 MW 3.21 MW
315176 1LOISA E 50/50 6.54 MW 6.54 MW
315177 1S ANNAG1 50/50 3.12 MW 3.12 MW
315178 1S ANNAS1 50/50 1.6 MW 1.6 MW
315179 1S ANNAG2 50/50 3.12 MW 3.12 MW
315180 1S ANNAS2 50/50 1.6 MW 1.6 MW
315225 1N ANNA1 50/50 96.8 MW 96.8 MW
315226 1N ANNA2 50/50 96.83 MW 96.83 MW
913392 Y1-086 E Adder 1.55 MW 1.31 MW
916192 Z1-068 E Adder 1.31 MW 1.11 MW
923832 AB2-022 E Adder 0.87 MW 0.74 MW
923852 AB2-025 E Adder 0.93 MW 0.79 MW
923862 AB2-026 E Adder 1.12 MW 0.95 MW
925022 AB2-158 E 50/50 11.64 MW 11.64 MW
938552 AE1-074 E Adder 1.03 MW 0.88 MW
938562 AE1-075 E Adder 0.96 MW 0.81 MW
957492 AF2-043 E Adder 1.0 MW 0.85 MW
966001 AG1-469 C 50/50 2.46 MW 2.46 MW
966002 AG1-469 E 50/50 1.23 MW 1.23 MW
901082 W1-029 E Adder 2.66 MW 2.26 MW
917122 Z2-027 E Adder 0.95 MW 0.81 MW
925522 AC1-027 E Adder 0.85 MW 0.72 MW
925672 AC1-043 E 50/50 11.48 MW 11.48 MW
957871 AF2-081 C Adder 7.01 MW 5.96 MW
957872 AF2-081 E Adder 3.01 MW 2.56 MW
966331 AG1-502 C 50/50 15.65 MW 15.65 MW
966332 AG1-502 E 50/50 3.91 MW 3.91 MW
966341 AG1-503 C 50/50 3.91 MW 3.91 MW
966342 AG1-503 E 50/50 0.98 MW 0.98 MW
314722 3TWITTYS Adder 0.75 MW 0.63 MW
926071 AC1-086 C Adder 15.95 MW 13.56 MW
926072 AC1-086 E Adder 7.26 MW 6.17 MW
936261 AD2-033 C Adder 10.2 MW 8.67 MW
936262 AD2-033 E Adder 6.8 MW 5.78 MW
933291 AC2-141 C Adder 21.14 MW 17.97 MW
933292 AC2-141 E Adder 9.02 MW 7.67 MW
934621 AD1-088 C Adder 10.01 MW 8.51 MW
934622 AD1-088 E Adder 4.71 MW 4.0 MW
939411 AE1-173 C Adder 78.27 MW 66.53 MW
939412 AE1-173 E Adder 52.18 MW 44.35 MW
962572 AG1-106 E Adder 1.03 MW 0.88 MW
961681 AG1-008 C Adder 11.61 MW 9.87 MW
961682 AG1-008 E Adder 5.87 MW 4.99 MW
962571 AG1-106 C Adder 2.26 MW 1.92 MW
208900 BRIS G1 50/50 -2.25 MW -2.25 MW
208901 BRIS G2 50/50 -2.67 MW -2.67 MW
314632 6AYDLETT TAP Adder 0.95 MW 0.81 MW
316164 AC1-076_C 50/50 1.03 MW 1.03 MW
316170 AC1-121 C 50/50 3.07 MW 3.07 MW
316192 AB2-158 C 50/50 4.08 MW 4.08 MW
316233 AE1-074 C Adder 2.05 MW 1.74 MW
316254 AC1-120 C 50/50 8.95 MW 8.95 MW
316257 AC1-043 C 50/50 7.04 MW 7.04 MW
316336 AC2-165 C Adder 8.8 MW 7.48 MW
924516 AB2-100 E1 Adder 2.25 MW 1.91 MW
924517 AB2-100 E2 Adder 2.25 MW 1.91 MW
934065 AD1-033 E Adder 3.51 MW 2.98 MW
937226 AE2-253 E Adder 4.1 MW 3.48 MW
926004 AC1-076_E 50/50 6.37 MW 6.37 MW
926486 AC1-120 E 50/50 4.61 MW 4.61 MW
926502 AC1-121 E 50/50 1.45 MW 1.45 MW
919153 AA1-139 E2 Adder 2.87 MW 2.44 MW
919152 AA1-139 E1 Adder 2.87 MW 2.44 MW
923994 AB2-040_E Adder 4.73 MW 4.02 MW
924022 AB2-043 E O1 Adder 4.08 MW 3.47 MW
316088 AB2-174 E Adder 5.02 MW 4.27 MW
316044 AC1-158 C1 50/50 17.3 MW 17.3 MW
316045 AC1-158 C2 50/50 17.3 MW 17.3 MW
926739 AC1-158 E1 50/50 48.5 MW 48.5 MW
926740 AC1-158 E2 50/50 48.5 MW 48.5 MW
944581 AF1-123 C Adder 32.09 MW 27.28 MW
944582 AF1-123 E Adder 73.49 MW 62.47 MW
944591 AF1-124 C Adder 32.21 MW 27.38 MW
944592 AF1-124 E Adder 73.76 MW 62.7 MW
944601 AF1-125 C Adder 31.6 MW 26.86 MW
944602 AF1-125 E Adder 72.34 MW 61.49 MW
957431 AF2-037 C 50/50 28.53 MW 28.53 MW
957432 AF2-037 E 50/50 19.02 MW 19.02 MW
957691 AF2-063 C 50/50 45.53 MW 45.53 MW
957692 AF2-063 E 50/50 30.35 MW 30.35 MW
962491 AG1-098 C Adder 9.01 MW 7.66 MW
962492 AG1-098 E Adder 6.01 MW 5.11 MW
962561 AG1-105 C Adder 6.94 MW 5.9 MW
962562 AG1-105 E Adder 4.63 MW 3.93 MW
964241 AG1-285 C Adder 9.84 MW 8.36 MW
964242 AG1-285 E Adder 6.56 MW 5.58 MW
964421 AG1-305 C 50/50 19.12 MW 19.12 MW
964422 AG1-305 E 50/50 12.75 MW 12.75 MW
965601 AG1-428 C Adder 3.74 MW 3.18 MW
965602 AG1-428 E Adder 2.49 MW 2.12 MW
965811 AG1-449 C Adder 21.7 MW 18.45 MW
965831 AG1-451 C Adder 2.57 MW 2.19 MW
313764 3SOCKMAN Adder 0.54 MW 0.46 MW
934612 AD1-087 E Adder 3.12 MW 2.65 MW
935172 AD1-152 E Adder 4.57 MW 3.89 MW
937482 AD2-202 E Adder 0.91 MW 0.78 MW
938531 AE1-072 C Adder 12.34 MW 10.49 MW
938532 AE1-072 E Adder 6.43 MW 5.47 MW
940481 AE2-033 C Adder 12.88 MW 10.94 MW
940482 AE2-033 E Adder 8.68 MW 7.38 MW
940541 AE2-040 C Adder 2.29 MW 1.95 MW
940641 AE2-051 C Adder 15.79 MW 13.43 MW
940642 AE2-051 E Adder 10.53 MW 8.95 MW
941281 AE2-122 C Adder 19.85 MW 16.88 MW
941282 AE2-122 E Adder 80.12 MW 68.1 MW
942461 AE2-259 C Adder 7.71 MW 6.56 MW
942462 AE2-259 E Adder 5.14 MW 4.37 MW
316303 AF2-085 50/50 3.85 MW 3.85 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 18.76 MW 18.76 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 15.99 MW 15.99 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 73.82 MW 73.82 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.92 MW 4.92 MW
NY PJM->LTFIMP_NY CLTF 2.31 MW 2.31 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.82 MW 0.82 MW
WEC LTFEXP_WEC->PJM CLTF 0.41 MW 0.41 MW
CPLE LTFEXP_CPLE->PJM CLTF 8.86 MW 8.86 MW
TVA LTFEXP_TVA->PJM CLTF 4.5 MW 4.5 MW
MEC LTFEXP_MEC->PJM CLTF 2.63 MW 2.63 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.68 MW 5.68 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.16 MW 0.16 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 31.37 MW 31.37 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.22 MW 4.22 MW

Details for 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 594_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P1-2: LN 594_SRT-S
CONTINGENCY 'DVP_P1-2: LN 594_SRT-S'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Single AC 119.79 3220.44 B 3857.63 32.12
Elimination
Base Case Details for Eliminated Flowgate 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 594_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C Adder 1.55 MW 1.32 MW
961941 AG1-037 C Adder 0.37 MW 0.32 MW
962331 AG1-082 C Adder 1.48 MW 1.26 MW
962341 AG1-083 C Adder 1.48 MW 1.26 MW
963041 AG1-153 C 80/20 5.14 MW 5.14 MW
963171 AG1-166 C Adder 0.77 MW 0.66 MW
963181 AG1-167 C Adder 0.58 MW 0.49 MW
963191 AG1-168 C Adder 0.58 MW 0.49 MW
963201 AG1-169 C Adder 0.58 MW 0.49 MW
963211 AG1-170 C Adder 0.39 MW 0.33 MW
964111 AG1-272 C 80/20 0.78 MW 0.78 MW
964121 AG1-273 C 80/20 0.78 MW 0.78 MW
964131 AG1-274 C 80/20 0.78 MW 0.78 MW
964791 AG1-342 C Adder 2.76 MW 2.34 MW
964801 AG1-343 C Adder 4.39 MW 3.73 MW
966811 AG1-552 C Adder 1.56 MW 1.32 MW
965191 AG1-384 C 80/20 0.78 MW 0.78 MW
965291 AG1-394 C Adder 0.63 MW 0.53 MW
965591 AG1-427 C 80/20 9.3 MW 9.3 MW
966621 AG1-532 C 80/20 1.08 MW 1.08 MW
313506 AB1-173 C OP 80/20 0.8 MW 0.8 MW
313853 3PONTONDP Adder 0.52 MW 0.44 MW
314704 3LAWRENC 80/20 0.22 MW 0.22 MW
315153 1CLOVER1 80/20 10.14 MW 10.14 MW
315154 1CLOVER2 80/20 10.04 MW 10.04 MW
315158 1KERR 1 80/20 0.3 MW 0.3 MW
315159 1KERR 2 80/20 0.83 MW 0.83 MW
315160 1KERR 3 80/20 0.83 MW 0.83 MW
315161 1KERR 4 80/20 0.83 MW 0.83 MW
315162 1KERR 5 80/20 0.83 MW 0.83 MW
942931 AE2-313 C 80/20 33.45 MW 33.45 MW
944011 AF1-069 C 80/20 12.13 MW 12.13 MW
958801 AF2-171 C 80/20 11.62 MW 11.62 MW
959311 AF2-222 C 80/20 12.98 MW 12.98 MW
960061 AF2-297 C Adder 6.0 MW 5.1 MW
960081 AF2-299 C 80/20 1.57 MW 1.57 MW
315163 1KERR 6 80/20 0.83 MW 0.83 MW
315164 1KERR 7 80/20 0.83 MW 0.83 MW
316129 AC1-054 C 80/20 0.87 MW 0.87 MW
316131 AB2-060 C 80/20 1.08 MW 1.08 MW
938371 AE1-056 C Adder 4.99 MW 4.25 MW
939181 AE1-148 C 80/20 7.07 MW 7.07 MW
941031 AE2-094 C 80/20 37.13 MW 37.13 MW
946281 AF1-292 C 80/20 1.2 MW 1.2 MW
946301 AF1-294 C Adder 3.17 MW 2.7 MW
957481 AF2-042 C 80/20 47.47 MW 47.47 MW
957521 AF2-046 C Adder 11.58 MW 9.85 MW
958211 AF2-115 C Adder 1.94 MW 1.65 MW
938771 AE1-103 C Adder 2.09 MW 1.78 MW
314507 3THOMPSN Adder 1.4 MW 1.19 MW
934861 AD1-115 C 80/20 3.31 MW 3.31 MW
942341 AE2-247 C Adder 1.03 MW 0.88 MW
943461 AF1-017 C Adder 0.93 MW 0.79 MW
944871 AF1-152 C Adder 3.72 MW 3.16 MW
315102 1BRUNSWICKG1 80/20 7.04 MW 7.04 MW
315103 1BRUNSWICKG2 80/20 7.04 MW 7.04 MW
315104 1BRUNSWICKG3 80/20 7.04 MW 7.04 MW
315105 1BRUNSWICKS1 80/20 14.63 MW 14.63 MW
315172 1LOISA A 80/20 3.1 MW 3.1 MW
315173 1LOISA B 80/20 3.11 MW 3.11 MW
315174 1LOISA C 80/20 3.11 MW 3.11 MW
315175 1LOISA D 80/20 3.11 MW 3.11 MW
315176 1LOISA E 80/20 6.34 MW 6.34 MW
315177 1S ANNAG1 80/20 3.03 MW 3.03 MW
315178 1S ANNAS1 80/20 1.56 MW 1.56 MW
315179 1S ANNAG2 80/20 3.03 MW 3.03 MW
315180 1S ANNAS2 80/20 1.56 MW 1.56 MW
315225 1N ANNA1 80/20 96.69 MW 96.69 MW
315226 1N ANNA2 80/20 96.73 MW 96.73 MW
315241 1Z1-086 GT1 80/20 9.03 MW 9.03 MW
315242 1Z1-086 GT2 80/20 9.02 MW 9.02 MW
315243 1Z1-086 GT3 80/20 9.02 MW 9.02 MW
315244 1Z1-086 ST 80/20 15.71 MW 15.71 MW
315260 1GOSPORTA Adder 1.47 MW 1.25 MW
315261 1GOSPORTB Adder 1.88 MW 1.6 MW
315262 1GOSPORTC Adder 1.6 MW 1.36 MW
966001 AG1-469 C 80/20 2.38 MW 2.38 MW
941501 AE2-147 C Adder 11.16 MW 9.49 MW
957871 AF2-081 C Adder 7.0 MW 5.95 MW
958161 AF2-110 C Adder 0.96 MW 0.81 MW
966331 AG1-502 C 80/20 15.13 MW 15.13 MW
966341 AG1-503 C 80/20 3.78 MW 3.78 MW
926071 AC1-086 C Adder 15.91 MW 13.53 MW
936261 AD2-033 C 80/20 10.15 MW 10.15 MW
933291 AC2-141 C Adder 21.08 MW 17.92 MW
934621 AD1-088 C 80/20 9.97 MW 9.97 MW
939411 AE1-173 C 80/20 78.1 MW 78.1 MW
961681 AG1-008 C Adder 11.58 MW 9.85 MW
962571 AG1-106 C Adder 2.25 MW 1.91 MW
208900 BRIS G1 80/20 -2.24 MW -2.24 MW
208901 BRIS G2 80/20 -2.65 MW -2.65 MW
316023 AB2-100 C2 80/20 0.69 MW 0.69 MW
316034 AC1-036 C 80/20 0.17 MW 0.17 MW
316164 AC1-076_C 80/20 1.01 MW 1.01 MW
316170 AC1-121 C 80/20 2.95 MW 2.95 MW
316192 AB2-158 C 80/20 4.03 MW 4.03 MW
316233 AE1-074 C 80/20 2.04 MW 2.04 MW
316237 AB2-079 C O1 80/20 0.24 MW 0.24 MW
316238 AB2-078 C O1 80/20 0.24 MW 0.24 MW
316239 AB2-077 C O1 80/20 0.24 MW 0.24 MW
316254 AC1-120 C 80/20 8.59 MW 8.59 MW
316257 AC1-043 C 80/20 6.61 MW 6.61 MW
316258 AE1-075 C 80/20 0.29 MW 0.29 MW
316313 AB2-026 C 80/20 0.32 MW 0.32 MW
316315 AB2-025 C 80/20 0.3 MW 0.3 MW
316336 AC2-165 C 80/20 8.76 MW 8.76 MW
316365 AB2-100 C1 80/20 0.69 MW 0.69 MW
316405 AF2-144 C 80/20 0.25 MW 0.25 MW
316181 AB2-040 GEN 80/20 0.91 MW 0.91 MW
313527 AB2-043 C 80/20 0.38 MW 0.38 MW
316087 AB2-174 C 80/20 0.84 MW 0.84 MW
316044 AC1-158 C1 80/20 17.27 MW 17.27 MW
316045 AC1-158 C2 80/20 17.27 MW 17.27 MW
316311 AC2-079 C Adder 3.97 MW 3.38 MW
316349 AD2-085 C Adder 2.38 MW 2.02 MW
941591 AE2-156 C Adder 12.4 MW 10.54 MW
944581 AF1-123 C Adder 32.01 MW 27.21 MW
944591 AF1-124 C Adder 32.12 MW 27.31 MW
944601 AF1-125 C Adder 31.52 MW 26.79 MW
957431 AF2-037 C 80/20 28.31 MW 28.31 MW
957691 AF2-063 C 80/20 45.18 MW 45.18 MW
962491 AG1-098 C 80/20 8.97 MW 8.97 MW
962561 AG1-105 C Adder 6.92 MW 5.88 MW
964241 AG1-285 C 80/20 9.8 MW 9.8 MW
964421 AG1-305 C 80/20 18.98 MW 18.98 MW
965601 AG1-428 C 80/20 3.73 MW 3.73 MW
965811 AG1-449 C 80/20 21.66 MW 21.66 MW
965831 AG1-451 C Adder 2.56 MW 2.17 MW
313764 3SOCKMAN 80/20 0.54 MW 0.54 MW
934611 AD1-087 C 80/20 1.0 MW 1.0 MW
935171 AD1-152 C 80/20 1.03 MW 1.03 MW
937481 AD2-202 C 80/20 0.29 MW 0.29 MW
938531 AE1-072 C Adder 12.31 MW 10.46 MW
940481 AE2-033 C 80/20 12.85 MW 12.85 MW
940541 AE2-040 C 80/20 2.29 MW 2.29 MW
940641 AE2-051 C 80/20 15.76 MW 15.76 MW
941101 AE2-104 C Adder 2.34 MW 1.99 MW
941281 AE2-122 C Adder 19.8 MW 16.83 MW
942461 AE2-259 C Adder 7.67 MW 6.52 MW
316303 AF2-085 80/20 3.85 MW 3.85 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 18.93 MW 18.93 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.01 MW 16.01 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 73.67 MW 73.67 MW
NY PJM->LTFIMP_NY CLTF 2.29 MW 2.29 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.82 MW 0.82 MW
WEC LTFEXP_WEC->PJM CLTF 0.41 MW 0.41 MW
CPLE LTFEXP_CPLE->PJM CLTF 8.84 MW 8.84 MW
TVA LTFEXP_TVA->PJM CLTF 4.5 MW 4.5 MW
MEC LTFEXP_MEC->PJM CLTF 2.64 MW 2.64 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.68 MW 5.68 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.16 MW 0.16 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.21 MW 4.21 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 106.97 3220.44 B 3444.92 65.87
Elimination
Base Case Details for Eliminated Flowgate 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.24 MW 1.06 MW
961791 AG1-021 C Adder 2.28 MW 1.94 MW
961941 AG1-037 C Adder 0.69 MW 0.59 MW
962331 AG1-082 C Adder 2.77 MW 2.35 MW
962341 AG1-083 C Adder 2.77 MW 2.35 MW
963041 AG1-153 C 80/20 8.43 MW 8.43 MW
963171 AG1-166 C Adder 1.14 MW 0.97 MW
963181 AG1-167 C Adder 0.86 MW 0.73 MW
963191 AG1-168 C Adder 0.86 MW 0.73 MW
963201 AG1-169 C Adder 0.86 MW 0.73 MW
963211 AG1-170 C Adder 0.57 MW 0.48 MW
964111 AG1-272 C Adder 1.19 MW 1.01 MW
964121 AG1-273 C Adder 1.19 MW 1.01 MW
964131 AG1-274 C Adder 1.19 MW 1.01 MW
964791 AG1-342 C Adder 4.43 MW 3.76 MW
964801 AG1-343 C Adder 8.22 MW 6.98 MW
966801 AG1-551 C Adder 2.84 MW 2.42 MW
966811 AG1-552 C Adder 2.77 MW 2.35 MW
965191 AG1-384 C Adder 1.19 MW 1.01 MW
965291 AG1-394 C Adder 1.18 MW 1.0 MW
965591 AG1-427 C Adder 14.61 MW 12.42 MW
966621 AG1-532 C Adder 1.89 MW 1.61 MW
313853 3PONTONDP Adder 0.76 MW 0.65 MW
315131 1EDGECMA Adder 20.38 MW 17.32 MW
315153 1CLOVER1 80/20 16.38 MW 16.38 MW
934521 AD1-076 C Adder 16.99 MW 14.44 MW
942931 AE2-313 C 80/20 54.7 MW 54.7 MW
944011 AF1-069 C 80/20 19.87 MW 19.87 MW
958801 AF2-171 C Adder 17.12 MW 14.55 MW
959311 AF2-222 C Adder 19.72 MW 16.76 MW
960061 AF2-297 C Adder 9.72 MW 8.26 MW
960081 AF2-299 C Adder 2.73 MW 2.32 MW
938371 AE1-056 C Adder 7.26 MW 6.17 MW
939181 AE1-148 C Adder 11.47 MW 9.75 MW
941031 AE2-094 C 80/20 60.82 MW 60.82 MW
946281 AF1-292 C Adder 2.09 MW 1.77 MW
946301 AF1-294 C Adder 4.67 MW 3.97 MW
957481 AF2-042 C 80/20 76.87 MW 76.87 MW
957521 AF2-046 C Adder 21.65 MW 18.41 MW
957861 AF2-080 C Adder 10.18 MW 8.65 MW
958211 AF2-115 C Adder 2.85 MW 2.42 MW
938771 AE1-103 C Adder 4.09 MW 3.48 MW
313526 AB2-022 C 80/20 0.5 MW 0.5 MW
314507 3THOMPSN 80/20 2.88 MW 2.88 MW
315060 1CHESTF5 Adder 69.46 MW 59.04 MW
315065 1CHESTF6 Adder 22.79 MW 19.37 MW
315073 1STONECA Adder 8.15 MW 6.93 MW
315083 1SPRUNCA Adder 10.67 MW 9.07 MW
315084 1SPRUNCB Adder 10.67 MW 9.07 MW
315092 1YORKTN3 Adder 182.39 MW 155.03 MW
942341 AE2-247 C 80/20 2.07 MW 2.07 MW
943461 AF1-017 C 80/20 1.87 MW 1.87 MW
944871 AF1-152 C 80/20 7.49 MW 7.49 MW
315098 1CHESPKA 80/20 0.58 MW 0.58 MW
315099 1CHESPKB 80/20 0.96 MW 0.96 MW
315102 1BRUNSWICKG1 80/20 11.53 MW 11.53 MW
315103 1BRUNSWICKG2 80/20 11.53 MW 11.53 MW
315104 1BRUNSWICKG3 80/20 11.53 MW 11.53 MW
315105 1BRUNSWICKS1 80/20 23.96 MW 23.96 MW
315108 1ELIZAR1 80/20 4.25 MW 4.25 MW
315109 1ELIZAR2 80/20 4.17 MW 4.17 MW
315110 1ELIZAR3 80/20 4.3 MW 4.3 MW
315233 1SURRY 2 80/20 32.2 MW 32.2 MW
315241 1Z1-086 GT1 80/20 14.79 MW 14.79 MW
315242 1Z1-086 GT2 80/20 14.78 MW 14.78 MW
315243 1Z1-086 GT3 80/20 14.78 MW 14.78 MW
315244 1Z1-086 ST 80/20 25.74 MW 25.74 MW
315260 1GOSPORTA 80/20 3.04 MW 3.04 MW
315261 1GOSPORTB 80/20 3.88 MW 3.88 MW
315262 1GOSPORTC 80/20 3.3 MW 3.3 MW
315605 6W1-029WIND 80/20 1.02 MW 1.02 MW
315611 6Z1-036WIND 80/20 0.86 MW 0.86 MW
957601 AF2-054 C Adder 2.29 MW 1.95 MW
962971 AG1-146 C Adder 3.14 MW 2.67 MW
962981 AG1-147 C Adder 7.32 MW 6.22 MW
941501 AE2-147 C 80/20 22.48 MW 22.48 MW
942001 AE2-212 C Adder 2.69 MW 2.28 MW
957871 AF2-081 C 80/20 14.28 MW 14.28 MW
958161 AF2-110 C 80/20 1.93 MW 1.93 MW
926071 AC1-086 C Adder 28.45 MW 24.18 MW
927021 AC1-189 C Adder 11.21 MW 9.53 MW
936261 AD2-033 C Adder 15.62 MW 13.28 MW
933291 AC2-141 C 80/20 44.3 MW 44.3 MW
934621 AD1-088 C Adder 14.99 MW 12.74 MW
939411 AE1-173 C 80/20 137.94 MW 137.94 MW
934011 AD1-025 C Adder 21.2 MW 18.02 MW
916191 Z1-068 C 80/20 0.06 MW 0.06 MW
933981 AD1-022 C Adder 12.13 MW 10.31 MW
960331 AF2-324 C Adder 9.17 MW 7.8 MW
961681 AG1-008 C Adder 21.65 MW 18.41 MW
962571 AG1-106 C Adder 4.02 MW 3.42 MW
316036 AC1-147 C 80/20 0.49 MW 0.49 MW
316072 AD1-144 C 80/20 0.36 MW 0.36 MW
316185 AD1-033 C 80/20 1.63 MW 1.63 MW
316210 AC1-098 C Adder 8.23 MW 6.99 MW
316212 AC1-099 C Adder 2.76 MW 2.34 MW
316233 AE1-074 C 80/20 3.33 MW 3.33 MW
316240 AF1-291 C Adder 2.55 MW 2.17 MW
316246 AF1-032 C 80/20 0.38 MW 0.38 MW
316263 AC1-034 C Adder 8.72 MW 7.41 MW
316274 AC1-208 C Adder 12.06 MW 10.25 MW
316294 AC1-161 C 80/20 6.71 MW 6.71 MW
316301 AE2-228 C Adder 2.56 MW 2.18 MW
316304 AE2-227 C Adder 2.3 MW 1.96 MW
316305 AF2-043 C 80/20 0.46 MW 0.46 MW
316315 AB2-025 C 80/20 0.53 MW 0.53 MW
316316 AC1-027 C 80/20 0.42 MW 0.42 MW
316320 Y1-086 C 80/20 0.29 MW 0.29 MW
316321 Z2-027 C 80/20 0.48 MW 0.48 MW
316336 AC2-165 C Adder 11.88 MW 10.1 MW
963221 AG1-171 C Adder 2.7 MW 2.29 MW
963231 AG1-172 C Adder 2.7 MW 2.29 MW
963241 AG1-173 C Adder 2.7 MW 2.29 MW
316017 AA1-139 ULT1 80/20 1.43 MW 1.43 MW
316018 AA1-139 ULT2 80/20 1.43 MW 1.43 MW
316375 AC2-012 C 80/20 1.79 MW 1.79 MW
316311 AC2-079 C 80/20 7.97 MW 7.97 MW
316349 AD2-085 C 80/20 4.77 MW 4.77 MW
316388 AE2-253 GEN 80/20 2.6 MW 2.6 MW
961611 AG1-000B C Adder 20.72 MW 17.61 MW
941591 AE2-156 C 80/20 25.58 MW 25.58 MW
942371 AE2-250 C Adder 11.82 MW 10.04 MW
944581 AF1-123 C 80/20 65.64 MW 65.64 MW
944591 AF1-124 C 80/20 65.87 MW 65.87 MW
944601 AF1-125 C 80/20 64.63 MW 64.63 MW
944631 AF1-128 C Adder 43.46 MW 36.94 MW
962271 AG1-075 C Adder 20.39 MW 17.33 MW
962491 AG1-098 C Adder 13.52 MW 11.49 MW
962561 AG1-105 C Adder 11.09 MW 9.43 MW
964241 AG1-285 C Adder 15.36 MW 13.05 MW
965281 AG1-393 C Adder 2.63 MW 2.23 MW
965601 AG1-428 C Adder 6.29 MW 5.35 MW
965691 AG1-437 C Adder 14.0 MW 11.9 MW
965701 AG1-438 C Adder 14.0 MW 11.9 MW
965711 AG1-439 C Adder 31.26 MW 26.57 MW
965741 AG1-442 C Adder 8.17 MW 6.94 MW
965751 AG1-443 C Adder 8.17 MW 6.94 MW
965761 AG1-444 C Adder 16.67 MW 14.17 MW
965811 AG1-449 C 80/20 35.42 MW 35.42 MW
965831 AG1-451 C Adder 3.58 MW 3.04 MW
313764 3SOCKMAN Adder 0.96 MW 0.82 MW
932631 AC2-084 C Adder 8.8 MW 7.48 MW
934321 AD1-056 C Adder 8.33 MW 7.08 MW
934331 AD1-057 C Adder 4.65 MW 3.95 MW
934501 AD1-074 C Adder 46.79 MW 39.77 MW
934511 AD1-075 C Adder 11.7 MW 9.94 MW
935161 AD1-151 C Adder 20.01 MW 17.01 MW
938531 AE1-072 C 80/20 25.09 MW 25.09 MW
939191 AE1-149 C Adder 14.14 MW 12.02 MW
940431 AE2-027 C Adder 15.53 MW 13.2 MW
940481 AE2-033 C 80/20 22.56 MW 22.56 MW
940541 AE2-040 C 80/20 4.01 MW 4.01 MW
940551 AE2-041 C Adder 7.63 MW 6.49 MW
940641 AE2-051 C 80/20 26.77 MW 26.77 MW
941101 AE2-104 C 80/20 4.73 MW 4.73 MW
941281 AE2-122 C 80/20 40.71 MW 40.71 MW
942461 AE2-259 C Adder 10.74 MW 9.12 MW
943471 AF1-018 C Adder 7.63 MW 6.49 MW
944641 AF1-129 C Adder 118.87 MW 101.04 MW
316303 AF2-085 80/20 5.76 MW 5.76 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 45.87 MW 45.87 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 31.22 MW 31.22 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 126.7 MW 126.7 MW
NY PJM->LTFIMP_NY CLTF 2.43 MW 2.43 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.84 MW 1.84 MW
WEC LTFEXP_WEC->PJM CLTF 0.95 MW 0.95 MW
CPLE LTFEXP_CPLE->PJM CLTF 15.09 MW 15.09 MW
TVA LTFEXP_TVA->PJM CLTF 8.34 MW 8.34 MW
MEC LTFEXP_MEC->PJM CLTF 5.63 MW 5.63 MW
LAGN LTFEXP_LAGN->PJM CLTF 10.54 MW 10.54 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.35 MW 0.35 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.2 MW 7.2 MW

Details for 8CARSON-6CARSON 500.0/230.0 kV Ckt 2 transformer l/o DVP_P4-2: 56372_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8CARSON-6CARSON 500.0/230.0 kV Ckt 2 transformer
314902 to 314282 ckt 2
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 132.78 1056.8 C 1403.21 59.16
Elimination
Base Case Details for Eliminated Flowgate 8CARSON-6CARSON 500.0/230.0 kV Ckt 2 transformer l/o DVP_P4-2: 56372_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 4.79 MW 4.79 MW
963042 AG1-153 E 50/50 7.18 MW 7.18 MW
966621 AG1-532 C Adder -1.19 MW -1.01 MW
314572 3EMPORIA Adder -0.34 MW -0.29 MW
315153 1CLOVER1 50/50 7.72 MW 7.72 MW
315154 1CLOVER2 50/50 7.65 MW 7.65 MW
926274 AC1-105 E Adder 1.03 MW 0.88 MW
942931 AE2-313 C 50/50 31.77 MW 31.77 MW
942932 AE2-313 E 50/50 21.18 MW 21.18 MW
943902 AF1-058 E Adder 0.57 MW 0.49 MW
944011 AF1-069 C 50/50 11.69 MW 11.69 MW
944012 AF1-069 E 50/50 4.54 MW 4.54 MW
960061 AF2-297 C Adder 3.44 MW 2.92 MW
960062 AF2-297 E Adder 2.29 MW 1.95 MW
941031 AE2-094 C 50/50 35.77 MW 35.77 MW
941032 AE2-094 E 50/50 16.02 MW 16.02 MW
946281 AF1-292 C Adder -1.31 MW -1.11 MW
957481 AF2-042 C 50/50 38.45 MW 38.45 MW
957482 AF2-042 E 50/50 25.63 MW 25.63 MW
314507 3THOMPSN Adder 0.66 MW 0.56 MW
314550 6HICKORY Adder 0.75 MW 0.64 MW
926662 AC1-147 E Adder 0.44 MW 0.37 MW
926755 AC1-161 E Adder 6.35 MW 5.4 MW
315102 1BRUNSWICKG1 50/50 6.55 MW 6.55 MW
315103 1BRUNSWICKG2 50/50 6.55 MW 6.55 MW
315104 1BRUNSWICKG3 50/50 6.55 MW 6.55 MW
315105 1BRUNSWICKS1 50/50 13.62 MW 13.62 MW
315241 1Z1-086 GT1 50/50 8.5 MW 8.5 MW
315242 1Z1-086 GT2 50/50 8.49 MW 8.49 MW
315243 1Z1-086 GT3 50/50 8.49 MW 8.49 MW
315244 1Z1-086 ST 50/50 14.79 MW 14.79 MW
315260 1GOSPORTA Adder 0.7 MW 0.59 MW
315261 1GOSPORTB Adder 0.89 MW 0.76 MW
315262 1GOSPORTC Adder 0.76 MW 0.64 MW
916192 Z1-068 E Adder 0.64 MW 0.54 MW
925522 AC1-027 E Adder 0.41 MW 0.35 MW
942001 AE2-212 C Adder -2.88 MW -2.45 MW
957871 AF2-081 C Adder 3.24 MW 2.75 MW
957872 AF2-081 E Adder 1.39 MW 1.18 MW
926071 AC1-086 C Adder -14.33 MW -12.18 MW
933291 AC2-141 C Adder 14.88 MW 12.64 MW
933292 AC2-141 E Adder 6.35 MW 5.4 MW
934621 AD1-088 C Adder 4.94 MW 4.2 MW
934622 AD1-088 E Adder 2.33 MW 1.98 MW
939411 AE1-173 C 50/50 67.69 MW 67.69 MW
939412 AE1-173 E 50/50 45.13 MW 45.13 MW
314632 6AYDLETT TAP Adder 0.42 MW 0.36 MW
316240 AF1-291 C Adder -2.29 MW -1.94 MW
316301 AE2-228 C Adder -2.36 MW -2.01 MW
316304 AE2-227 C Adder -0.84 MW -0.71 MW
927255 AC1-221 E Adder 1.77 MW 1.5 MW
927264 AC1-222 E Adder 1.75 MW 1.49 MW
932763 AC2-100 E Adder 1.19 MW 1.01 MW
934065 AD1-033 E Adder 1.75 MW 1.49 MW
937226 AE2-253 E Adder 1.94 MW 1.65 MW
919153 AA1-139 E2 Adder 1.32 MW 1.13 MW
919152 AA1-139 E1 Adder 1.32 MW 1.13 MW
932046 AC2-012 E Adder 4.31 MW 3.66 MW
941591 AE2-156 C Adder 5.96 MW 5.06 MW
944581 AF1-123 C Adder 17.92 MW 15.23 MW
944582 AF1-123 E Adder 41.03 MW 34.88 MW
944591 AF1-124 C Adder 17.98 MW 15.29 MW
944592 AF1-124 E Adder 41.18 MW 35.01 MW
944601 AF1-125 C Adder 17.64 MW 15.0 MW
944602 AF1-125 E Adder 40.39 MW 34.33 MW
962491 AG1-098 C Adder 4.49 MW 3.81 MW
962492 AG1-098 E Adder 2.99 MW 2.54 MW
965811 AG1-449 C 50/50 20.58 MW 20.58 MW
313764 3SOCKMAN Adder -0.36 MW -0.31 MW
934321 AD1-056 C Adder -2.17 MW -1.85 MW
934331 AD1-057 C Adder -1.21 MW -1.03 MW
934611 AD1-087 C 50/50 0.76 MW 0.76 MW
934612 AD1-087 E 50/50 2.36 MW 2.36 MW
935171 AD1-152 C 50/50 0.74 MW 0.74 MW
935172 AD1-152 E 50/50 3.28 MW 3.28 MW
937481 AD2-202 C 50/50 0.22 MW 0.22 MW
937482 AD2-202 E 50/50 0.69 MW 0.69 MW
938531 AE1-072 C Adder 5.56 MW 4.73 MW
938532 AE1-072 E Adder 2.9 MW 2.46 MW
940641 AE2-051 C 50/50 15.02 MW 15.02 MW
940642 AE2-051 E 50/50 10.01 MW 10.01 MW
941281 AE2-122 C Adder 9.65 MW 8.21 MW
941282 AE2-122 E Adder 38.96 MW 33.11 MW
944641 AF1-129 C Adder -100.69 MW -85.59 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 15.5 MW 15.5 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.04 MW 10.04 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 38.93 MW 38.93 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.15 MW 1.15 MW
NY PJM->LTFIMP_NY CLTF 0.52 MW 0.52 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.6 MW 0.6 MW
WEC LTFEXP_WEC->PJM CLTF 0.32 MW 0.32 MW
CPLE LTFEXP_CPLE->PJM CLTF 4.33 MW 4.33 MW
TVA LTFEXP_TVA->PJM CLTF 2.65 MW 2.65 MW
MEC LTFEXP_MEC->PJM CLTF 1.85 MW 1.85 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.36 MW 3.36 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.12 MW 0.12 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.29 MW 7.29 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.07 MW 2.07 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P4-2: H2T574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P4-2: H2T574_SRT-S
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 123.28 3940.0 C 4857.22 230.97
Elimination
Base Case Details for Eliminated Flowgate 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P4-2: H2T574_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 8.89 MW 8.89 MW
963042 AG1-153 E 50/50 13.34 MW 13.34 MW
314541 3WATKINS Adder 1.04 MW 0.89 MW
942931 AE2-313 C 50/50 57.55 MW 57.55 MW
942932 AE2-313 E 50/50 38.37 MW 38.37 MW
944011 AF1-069 C 50/50 20.87 MW 20.87 MW
944012 AF1-069 E 50/50 8.11 MW 8.11 MW
940492 AE2-034 E Adder 4.65 MW 3.96 MW
941031 AE2-094 C 50/50 63.88 MW 63.88 MW
941032 AE2-094 E 50/50 28.61 MW 28.61 MW
957481 AF2-042 C Adder 82.18 MW 69.85 MW
957482 AF2-042 E Adder 54.78 MW 46.57 MW
314539 3UNCAMP Adder 9.2 MW 7.82 MW
916042 Z1-036 E Adder 43.58 MW 37.04 MW
938771 AE1-103 C Adder 4.44 MW 3.77 MW
938772 AE1-103 E Adder 6.13 MW 5.21 MW
314331 6POE 50/50 2.08 MW 2.08 MW
314507 3THOMPSN Adder 3.09 MW 2.63 MW
314525 6KINGFORK Adder 1.53 MW 1.3 MW
314550 6HICKORY 50/50 3.34 MW 3.34 MW
315083 1SPRUNCA Adder 13.36 MW 11.35 MW
315084 1SPRUNCB Adder 13.36 MW 11.35 MW
926662 AC1-147 E Adder 2.03 MW 1.72 MW
926755 AC1-161 E 50/50 19.96 MW 19.96 MW
927226 AC1-216 E Adder 11.14 MW 9.47 MW
935112 AD1-144 E Adder 1.42 MW 1.21 MW
942162 AE2-228 E Adder 2.09 MW 1.77 MW
942341 AE2-247 C Adder 2.27 MW 1.93 MW
942342 AE2-247 E Adder 3.13 MW 2.66 MW
943461 AF1-017 C Adder 2.05 MW 1.75 MW
943462 AF1-017 E Adder 3.35 MW 2.85 MW
943612 AF1-032 E Adder 1.41 MW 1.2 MW
944871 AF1-152 C Adder 8.05 MW 6.84 MW
944872 AF1-152 E Adder 5.37 MW 4.56 MW
958502 AF2-144 E Adder 1.78 MW 1.52 MW
315102 1BRUNSWICKG1 50/50 12.17 MW 12.17 MW
315103 1BRUNSWICKG2 50/50 12.17 MW 12.17 MW
315104 1BRUNSWICKG3 50/50 12.17 MW 12.17 MW
315105 1BRUNSWICKS1 50/50 25.28 MW 25.28 MW
315108 1ELIZAR1 50/50 4.55 MW 4.55 MW
315109 1ELIZAR2 50/50 4.47 MW 4.47 MW
315110 1ELIZAR3 50/50 4.61 MW 4.61 MW
315241 1Z1-086 GT1 50/50 15.58 MW 15.58 MW
315242 1Z1-086 GT2 50/50 15.57 MW 15.57 MW
315243 1Z1-086 GT3 50/50 15.57 MW 15.57 MW
315244 1Z1-086 ST 50/50 27.12 MW 27.12 MW
315260 1GOSPORTA Adder 3.26 MW 2.77 MW
315261 1GOSPORTB Adder 4.16 MW 3.54 MW
315262 1GOSPORTC Adder 3.54 MW 3.0 MW
913392 Y1-086 E Adder 3.35 MW 2.85 MW
916192 Z1-068 E 50/50 2.88 MW 2.88 MW
923832 AB2-022 E Adder 1.89 MW 1.61 MW
923852 AB2-025 E 50/50 1.78 MW 1.78 MW
923862 AB2-026 E Adder 1.82 MW 1.54 MW
938552 AE1-074 E 50/50 1.99 MW 1.99 MW
938562 AE1-075 E Adder 1.55 MW 1.32 MW
939312 AE1-162 E Adder 2.14 MW 1.81 MW
946262 AF1-291 E Adder 2.08 MW 1.77 MW
957492 AF2-043 E Adder 2.17 MW 1.85 MW
901082 W1-029 E Adder 48.57 MW 41.29 MW
917122 Z2-027 E Adder 2.05 MW 1.74 MW
925522 AC1-027 E 50/50 1.86 MW 1.86 MW
941501 AE2-147 C Adder 24.15 MW 20.53 MW
941502 AE2-147 E Adder 16.1 MW 13.69 MW
942001 AE2-212 C Adder 3.2 MW 2.72 MW
942002 AE2-212 E Adder 2.13 MW 1.81 MW
957871 AF2-081 C Adder 15.29 MW 12.99 MW
957872 AF2-081 E Adder 6.55 MW 5.57 MW
958161 AF2-110 C Adder 2.09 MW 1.77 MW
958162 AF2-110 E Adder 3.32 MW 2.82 MW
933291 AC2-141 C 50/50 46.76 MW 46.76 MW
933292 AC2-141 E 50/50 19.96 MW 19.96 MW
939411 AE1-173 C 50/50 145.2 MW 145.2 MW
939412 AE1-173 E 50/50 96.8 MW 96.8 MW
934011 AD1-025 C Adder 24.35 MW 20.7 MW
934012 AD1-025 E Adder 14.42 MW 12.26 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
314632 6AYDLETT TAP Adder 2.07 MW 1.76 MW
316185 AD1-033 C 50/50 1.75 MW 1.75 MW
316233 AE1-074 C 50/50 3.96 MW 3.96 MW
316240 AF1-291 C Adder 3.12 MW 2.65 MW
316294 AC1-161 C 50/50 7.08 MW 7.08 MW
316301 AE2-228 C Adder 3.13 MW 2.66 MW
316315 AB2-025 C 50/50 0.58 MW 0.58 MW
316316 AC1-027 C 50/50 0.45 MW 0.45 MW
924516 AB2-100 E1 Adder 4.35 MW 3.7 MW
924517 AB2-100 E2 Adder 4.35 MW 3.7 MW
934065 AD1-033 E 50/50 7.69 MW 7.69 MW
937226 AE2-253 E Adder 8.94 MW 7.6 MW
963221 AG1-171 C Adder 3.1 MW 2.64 MW
963222 AG1-171 E Adder 2.07 MW 1.76 MW
963231 AG1-172 C Adder 3.1 MW 2.64 MW
963232 AG1-172 E Adder 2.07 MW 1.76 MW
963241 AG1-173 C Adder 3.1 MW 2.64 MW
963242 AG1-173 E Adder 2.07 MW 1.76 MW
919153 AA1-139 E2 Adder 6.25 MW 5.31 MW
919152 AA1-139 E1 Adder 6.25 MW 5.31 MW
920692 AA2-178 E Adder 6.2 MW 5.27 MW
924814 AB2-134 E Adder 18.25 MW 15.51 MW
316084 AB2-161 E Adder 8.36 MW 7.11 MW
316375 AC2-012 C 50/50 1.92 MW 1.92 MW
932046 AC2-012 E 50/50 20.06 MW 20.06 MW
316311 AC2-079 C Adder 8.73 MW 7.42 MW
932596 AC2-079 E Adder 14.24 MW 12.1 MW
934576 AD1-082 E Adder 6.66 MW 5.67 MW
316349 AD2-085 C Adder 5.24 MW 4.45 MW
936666 AD2-085 E Adder 8.54 MW 7.26 MW
961611 AG1-000B C Adder 23.26 MW 19.77 MW
941591 AE2-156 C 50/50 27.42 MW 27.42 MW
942371 AE2-250 C Adder 14.13 MW 12.01 MW
942372 AE2-250 E Adder 7.46 MW 6.34 MW
944581 AF1-123 C 50/50 69.96 MW 69.96 MW
944582 AF1-123 E 50/50 160.19 MW 160.19 MW
944591 AF1-124 C 50/50 70.2 MW 70.2 MW
944592 AF1-124 E 50/50 160.77 MW 160.77 MW
944601 AF1-125 C 50/50 68.88 MW 68.88 MW
944602 AF1-125 E 50/50 157.68 MW 157.68 MW
962271 AG1-075 C Adder 24.39 MW 20.73 MW
962272 AG1-075 E Adder 14.87 MW 12.64 MW
965281 AG1-393 C Adder 3.14 MW 2.67 MW
965282 AG1-393 E Adder 2.09 MW 1.78 MW
965811 AG1-449 C 50/50 37.27 MW 37.27 MW
934612 AD1-087 E Adder 5.4 MW 4.59 MW
937482 AD2-202 E Adder 1.58 MW 1.34 MW
938531 AE1-072 C Adder 26.87 MW 22.84 MW
938532 AE1-072 E Adder 14.01 MW 11.91 MW
939191 AE1-149 C Adder 16.18 MW 13.75 MW
939192 AE1-149 E Adder 10.78 MW 9.17 MW
940431 AE2-027 C Adder 18.7 MW 15.89 MW
940432 AE2-027 E Adder 12.46 MW 10.6 MW
940481 AE2-033 C 50/50 24.78 MW 24.78 MW
940482 AE2-033 E 50/50 16.7 MW 16.7 MW
940541 AE2-040 C 50/50 4.41 MW 4.41 MW
940641 AE2-051 C 50/50 28.06 MW 28.06 MW
940642 AE2-051 E 50/50 18.7 MW 18.7 MW
941101 AE2-104 C Adder 5.12 MW 4.35 MW
941102 AE2-104 E Adder 8.13 MW 6.91 MW
941281 AE2-122 C 50/50 43.58 MW 43.58 MW
941282 AE2-122 E 50/50 175.87 MW 175.87 MW
944641 AF1-129 C Adder 140.75 MW 119.64 MW
316303 AF2-085 50/50 6.52 MW 6.52 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 65.17 MW 65.17 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 40.43 MW 40.43 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 145.91 MW 145.91 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 7.14 MW 7.14 MW
NY PJM->LTFIMP_NY CLTF 3.25 MW 3.25 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.6 MW 2.6 MW
WEC LTFEXP_WEC->PJM CLTF 1.34 MW 1.34 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.89 MW 16.89 MW
TVA LTFEXP_TVA->PJM CLTF 10.54 MW 10.54 MW
MEC LTFEXP_MEC->PJM CLTF 7.65 MW 7.65 MW
LAGN LTFEXP_LAGN->PJM CLTF 13.22 MW 13.22 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.49 MW 0.49 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 45.41 MW 45.41 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.06 MW 8.06 MW

Details for 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 575_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P1-2: LN 575_SRT-S
CONTINGENCY 'DVP_P1-2: LN 575_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1                /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Single AC 128.15 3220.44 B 4127.12 41.06
Elimination
Base Case Details for Eliminated Flowgate 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 575_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.83 MW 0.7 MW
961791 AG1-021 C Adder 1.74 MW 1.48 MW
961941 AG1-037 C Adder 0.45 MW 0.39 MW
962331 AG1-082 C Adder 1.81 MW 1.54 MW
962341 AG1-083 C Adder 1.81 MW 1.54 MW
963041 AG1-153 C 80/20 5.72 MW 5.72 MW
963171 AG1-166 C Adder 0.87 MW 0.74 MW
963181 AG1-167 C Adder 0.65 MW 0.55 MW
963191 AG1-168 C Adder 0.65 MW 0.55 MW
963201 AG1-169 C Adder 0.65 MW 0.55 MW
963211 AG1-170 C Adder 0.44 MW 0.37 MW
964111 AG1-272 C Adder 0.88 MW 0.75 MW
964121 AG1-273 C Adder 0.88 MW 0.75 MW
964131 AG1-274 C Adder 0.88 MW 0.75 MW
964791 AG1-342 C Adder 3.13 MW 2.66 MW
964801 AG1-343 C Adder 5.38 MW 4.57 MW
966801 AG1-551 C Adder 1.87 MW 1.59 MW
966811 AG1-552 C Adder 1.86 MW 1.58 MW
965191 AG1-384 C Adder 0.88 MW 0.75 MW
965291 AG1-394 C Adder 0.77 MW 0.65 MW
965591 AG1-427 C Adder 10.56 MW 8.97 MW
966621 AG1-532 C Adder 1.28 MW 1.09 MW
313853 3PONTONDP Adder 0.58 MW 0.49 MW
315131 1EDGECMA Adder 13.66 MW 11.61 MW
315153 1CLOVER1 80/20 11.34 MW 11.34 MW
315154 1CLOVER2 80/20 11.23 MW 11.23 MW
934521 AD1-076 C Adder 10.95 MW 9.3 MW
942931 AE2-313 C 80/20 37.1 MW 37.1 MW
944011 AF1-069 C 80/20 13.45 MW 13.45 MW
958801 AF2-171 C Adder 13.04 MW 11.09 MW
959311 AF2-222 C Adder 14.65 MW 12.46 MW
960061 AF2-297 C Adder 6.81 MW 5.79 MW
960081 AF2-299 C Adder 1.85 MW 1.58 MW
938371 AE1-056 C Adder 5.6 MW 4.76 MW
939181 AE1-148 C Adder 8.07 MW 6.86 MW
941031 AE2-094 C 80/20 41.17 MW 41.17 MW
946281 AF1-292 C Adder 1.42 MW 1.2 MW
946301 AF1-294 C Adder 3.56 MW 3.03 MW
957481 AF2-042 C 80/20 52.96 MW 52.96 MW
957521 AF2-046 C Adder 14.17 MW 12.05 MW
957861 AF2-080 C Adder 6.75 MW 5.74 MW
958211 AF2-115 C Adder 2.17 MW 1.85 MW
938771 AE1-103 C Adder 2.63 MW 2.23 MW
314507 3THOMPSN Adder 1.8 MW 1.53 MW
315065 1CHESTF6 Adder 15.82 MW 13.45 MW
315073 1STONECA Adder 5.36 MW 4.56 MW
315083 1SPRUNCA Adder 7.71 MW 6.55 MW
315084 1SPRUNCB Adder 7.71 MW 6.55 MW
315092 1YORKTN3 Adder 108.21 MW 91.98 MW
942341 AE2-247 C Adder 1.33 MW 1.13 MW
943461 AF1-017 C Adder 1.2 MW 1.02 MW
944871 AF1-152 C Adder 4.73 MW 4.02 MW
315099 1CHESPKB 80/20 0.6 MW 0.6 MW
315102 1BRUNSWICKG1 80/20 7.82 MW 7.82 MW
315103 1BRUNSWICKG2 80/20 7.82 MW 7.82 MW
315104 1BRUNSWICKG3 80/20 7.82 MW 7.82 MW
315105 1BRUNSWICKS1 80/20 16.25 MW 16.25 MW
315108 1ELIZAR1 80/20 2.65 MW 2.65 MW
315109 1ELIZAR2 80/20 2.6 MW 2.6 MW
315110 1ELIZAR3 80/20 2.69 MW 2.69 MW
315172 1LOISA A 80/20 2.2 MW 2.2 MW
315173 1LOISA B 80/20 2.22 MW 2.22 MW
315174 1LOISA C 80/20 2.22 MW 2.22 MW
315175 1LOISA D 80/20 2.22 MW 2.22 MW
315176 1LOISA E 80/20 4.52 MW 4.52 MW
315177 1S ANNAG1 80/20 2.2 MW 2.2 MW
315178 1S ANNAS1 80/20 1.13 MW 1.13 MW
315179 1S ANNAG2 80/20 2.2 MW 2.2 MW
315180 1S ANNAS2 80/20 1.13 MW 1.13 MW
315225 1N ANNA1 80/20 86.24 MW 86.24 MW
315226 1N ANNA2 80/20 86.27 MW 86.27 MW
315241 1Z1-086 GT1 80/20 10.03 MW 10.03 MW
315242 1Z1-086 GT2 80/20 10.02 MW 10.02 MW
315243 1Z1-086 GT3 80/20 10.02 MW 10.02 MW
315244 1Z1-086 ST 80/20 17.45 MW 17.45 MW
315260 1GOSPORTA Adder 1.9 MW 1.61 MW
315261 1GOSPORTB Adder 2.43 MW 2.06 MW
315262 1GOSPORTC Adder 2.06 MW 1.75 MW
966001 AG1-469 C Adder 1.43 MW 1.22 MW
941501 AE2-147 C Adder 14.18 MW 12.05 MW
942001 AE2-212 C Adder 1.85 MW 1.57 MW
957871 AF2-081 C 80/20 8.94 MW 8.94 MW
958161 AF2-110 C Adder 1.22 MW 1.04 MW
926071 AC1-086 C Adder 19.03 MW 16.17 MW
927021 AC1-189 C Adder 7.43 MW 6.32 MW
936261 AD2-033 C Adder 11.48 MW 9.76 MW
933291 AC2-141 C 80/20 27.16 MW 27.16 MW
934621 AD1-088 C Adder 11.12 MW 9.45 MW
939411 AE1-173 C 80/20 90.55 MW 90.55 MW
934011 AD1-025 C Adder 13.61 MW 11.56 MW
916191 Z1-068 C 80/20 0.04 MW 0.04 MW
933981 AD1-022 C Adder 7.84 MW 6.66 MW
960331 AF2-324 C Adder 6.15 MW 5.22 MW
961681 AG1-008 C Adder 14.17 MW 12.05 MW
962571 AG1-106 C Adder 2.69 MW 2.29 MW
208900 BRIS G1 80/20 -2.39 MW -2.39 MW
208901 BRIS G2 80/20 -2.83 MW -2.83 MW
316023 AB2-100 C2 80/20 0.82 MW 0.82 MW
316185 AD1-033 C 80/20 1.02 MW 1.02 MW
316192 AB2-158 C 80/20 3.32 MW 3.32 MW
316210 AC1-098 C Adder 5.47 MW 4.65 MW
316212 AC1-099 C Adder 1.83 MW 1.56 MW
316233 AE1-074 C 80/20 2.46 MW 2.46 MW
316240 AF1-291 C Adder 1.77 MW 1.5 MW
316258 AE1-075 C 80/20 0.33 MW 0.33 MW
316263 AC1-034 C Adder 5.84 MW 4.97 MW
316274 AC1-208 C Adder 8.06 MW 6.85 MW
316294 AC1-161 C 80/20 4.11 MW 4.11 MW
316301 AE2-228 C Adder 1.78 MW 1.51 MW
316304 AE2-227 C Adder 1.57 MW 1.33 MW
316313 AB2-026 C 80/20 0.35 MW 0.35 MW
316315 AB2-025 C 80/20 0.36 MW 0.36 MW
316316 AC1-027 C 80/20 0.26 MW 0.26 MW
316336 AC2-165 C 80/20 9.68 MW 9.68 MW
316365 AB2-100 C1 80/20 0.82 MW 0.82 MW
316405 AF2-144 C 80/20 0.28 MW 0.28 MW
963221 AG1-171 C Adder 1.73 MW 1.47 MW
963231 AG1-172 C Adder 1.73 MW 1.47 MW
963241 AG1-173 C Adder 1.73 MW 1.47 MW
316017 AA1-139 ULT1 80/20 0.9 MW 0.9 MW
316018 AA1-139 ULT2 80/20 0.9 MW 0.9 MW
316375 AC2-012 C 80/20 1.12 MW 1.12 MW
316311 AC2-079 C Adder 5.11 MW 4.34 MW
316349 AD2-085 C Adder 3.06 MW 2.6 MW
316388 AE2-253 GEN 80/20 1.63 MW 1.63 MW
961611 AG1-000B C Adder 13.11 MW 11.14 MW
941591 AE2-156 C 80/20 15.97 MW 15.97 MW
942371 AE2-250 C Adder 8.06 MW 6.85 MW
944581 AF1-123 C 80/20 40.91 MW 40.91 MW
944591 AF1-124 C 80/20 41.06 MW 41.06 MW
944601 AF1-125 C 80/20 40.28 MW 40.28 MW
957431 AF2-037 C 80/20 24.12 MW 24.12 MW
957691 AF2-063 C 80/20 38.49 MW 38.49 MW
962271 AG1-075 C Adder 13.91 MW 11.82 MW
962491 AG1-098 C Adder 10.01 MW 8.51 MW
962561 AG1-105 C Adder 7.86 MW 6.68 MW
964241 AG1-285 C Adder 11.12 MW 9.45 MW
964421 AG1-305 C 80/20 16.17 MW 16.17 MW
965281 AG1-393 C Adder 1.79 MW 1.52 MW
965601 AG1-428 C Adder 4.35 MW 3.7 MW
965691 AG1-437 C Adder 9.06 MW 7.71 MW
965701 AG1-438 C Adder 9.06 MW 7.71 MW
965711 AG1-439 C Adder 20.78 MW 17.66 MW
965741 AG1-442 C Adder 5.29 MW 4.5 MW
965751 AG1-443 C Adder 5.29 MW 4.5 MW
965761 AG1-444 C Adder 11.08 MW 9.42 MW
965811 AG1-449 C 80/20 24.02 MW 24.02 MW
965831 AG1-451 C Adder 2.85 MW 2.42 MW
313764 3SOCKMAN Adder 0.65 MW 0.55 MW
932631 AC2-084 C Adder 5.85 MW 4.97 MW
934321 AD1-056 C Adder 5.58 MW 4.74 MW
934331 AD1-057 C Adder 3.11 MW 2.65 MW
934501 AD1-074 C Adder 30.14 MW 25.62 MW
934511 AD1-075 C Adder 7.54 MW 6.41 MW
934611 AD1-087 C 80/20 1.12 MW 1.12 MW
935161 AD1-151 C Adder 12.91 MW 10.97 MW
935171 AD1-152 C 80/20 1.15 MW 1.15 MW
937481 AD2-202 C 80/20 0.32 MW 0.32 MW
938531 AE1-072 C Adder 15.72 MW 13.37 MW
939191 AE1-149 C Adder 9.43 MW 8.02 MW
940431 AE2-027 C Adder 10.59 MW 9.0 MW
940481 AE2-033 C 80/20 15.26 MW 15.26 MW
940541 AE2-040 C 80/20 2.72 MW 2.72 MW
940641 AE2-051 C 80/20 17.82 MW 17.82 MW
941101 AE2-104 C Adder 3.0 MW 2.55 MW
941281 AE2-122 C 80/20 25.43 MW 25.43 MW
942461 AE2-259 C Adder 8.54 MW 7.26 MW
944641 AF1-129 C Adder 82.53 MW 70.15 MW
316303 AF2-085 80/20 4.28 MW 4.28 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 24.85 MW 24.85 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 19.74 MW 19.74 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 86.34 MW 86.34 MW
NY PJM->LTFIMP_NY CLTF 2.46 MW 2.46 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.07 MW 1.07 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.27 MW 10.27 MW
TVA LTFEXP_TVA->PJM CLTF 5.48 MW 5.48 MW
MEC LTFEXP_MEC->PJM CLTF 3.35 MW 3.35 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.89 MW 6.89 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.21 MW 0.21 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.89 MW 4.89 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Single AC 104.94 3220.44 B 3379.63 66.47
Elimination
Base Case Details for Eliminated Flowgate 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.25 MW 1.06 MW
961941 AG1-037 C Adder 0.68 MW 0.58 MW
962331 AG1-082 C Adder 2.72 MW 2.31 MW
962341 AG1-083 C Adder 2.72 MW 2.31 MW
963041 AG1-153 C 80/20 9.38 MW 9.38 MW
964111 AG1-272 C Adder 0.98 MW 0.83 MW
964121 AG1-273 C Adder 0.98 MW 0.83 MW
964131 AG1-274 C Adder 0.98 MW 0.83 MW
964791 AG1-342 C Adder 4.27 MW 3.63 MW
964801 AG1-343 C Adder 8.0 MW 6.8 MW
966801 AG1-551 C Adder 2.84 MW 2.42 MW
966811 AG1-552 C Adder 2.7 MW 2.3 MW
965191 AG1-384 C Adder 0.98 MW 0.83 MW
965291 AG1-394 C Adder 1.14 MW 0.97 MW
965591 AG1-427 C Adder 12.96 MW 11.02 MW
966621 AG1-532 C Adder 1.82 MW 1.55 MW
315131 1EDGECMA Adder 20.51 MW 17.43 MW
315153 1CLOVER1 80/20 17.14 MW 17.14 MW
315154 1CLOVER2 80/20 16.97 MW 16.97 MW
934521 AD1-076 C 80/20 16.83 MW 16.83 MW
942931 AE2-313 C 80/20 61.05 MW 61.05 MW
944011 AF1-069 C 80/20 22.28 MW 22.28 MW
959311 AF2-222 C Adder 16.02 MW 13.62 MW
960061 AF2-297 C Adder 9.76 MW 8.3 MW
960081 AF2-299 C Adder 2.63 MW 2.23 MW
939181 AE1-148 C Adder 10.94 MW 9.3 MW
940491 AE2-034 C 80/20 1.48 MW 1.48 MW
941031 AE2-094 C 80/20 68.19 MW 68.19 MW
946281 AF1-292 C Adder 2.01 MW 1.71 MW
957481 AF2-042 C 80/20 81.74 MW 81.74 MW
957521 AF2-046 C Adder 21.19 MW 18.01 MW
957861 AF2-080 C Adder 10.21 MW 8.68 MW
938771 AE1-103 C 80/20 3.96 MW 3.96 MW
313526 AB2-022 C 80/20 0.49 MW 0.49 MW
314507 3THOMPSN 80/20 2.83 MW 2.83 MW
315092 1YORKTN3 Adder 148.58 MW 126.29 MW
942341 AE2-247 C Adder 1.88 MW 1.6 MW
943461 AF1-017 C Adder 1.71 MW 1.45 MW
944871 AF1-152 C 80/20 7.41 MW 7.41 MW
315098 1CHESPKA 80/20 0.57 MW 0.57 MW
315099 1CHESPKB 80/20 0.94 MW 0.94 MW
315102 1BRUNSWICKG1 80/20 12.83 MW 12.83 MW
315103 1BRUNSWICKG2 80/20 12.83 MW 12.83 MW
315104 1BRUNSWICKG3 80/20 12.83 MW 12.83 MW
315105 1BRUNSWICKS1 80/20 26.67 MW 26.67 MW
315108 1ELIZAR1 80/20 4.19 MW 4.19 MW
315109 1ELIZAR2 80/20 4.12 MW 4.12 MW
315110 1ELIZAR3 80/20 4.24 MW 4.24 MW
315233 1SURRY 2 80/20 32.88 MW 32.88 MW
315241 1Z1-086 GT1 80/20 16.5 MW 16.5 MW
315242 1Z1-086 GT2 80/20 16.49 MW 16.49 MW
315243 1Z1-086 GT3 80/20 16.49 MW 16.49 MW
315244 1Z1-086 ST 80/20 28.71 MW 28.71 MW
315260 1GOSPORTA 80/20 2.99 MW 2.99 MW
315261 1GOSPORTB 80/20 3.82 MW 3.82 MW
315262 1GOSPORTC 80/20 3.24 MW 3.24 MW
315605 6W1-029WIND 80/20 1.01 MW 1.01 MW
315611 6Z1-036WIND 80/20 0.85 MW 0.85 MW
941501 AE2-147 C 80/20 22.22 MW 22.22 MW
957871 AF2-081 C 80/20 14.21 MW 14.21 MW
958161 AF2-110 C 80/20 1.86 MW 1.86 MW
926071 AC1-086 C Adder 27.83 MW 23.65 MW
927021 AC1-189 C Adder 11.24 MW 9.56 MW
936261 AD2-033 C Adder 13.15 MW 11.17 MW
933291 AC2-141 C 80/20 46.17 MW 46.17 MW
934621 AD1-088 C Adder 12.64 MW 10.74 MW
939411 AE1-173 C 80/20 150.21 MW 150.21 MW
934011 AD1-025 C Adder 14.52 MW 12.34 MW
916191 Z1-068 C 80/20 0.06 MW 0.06 MW
933981 AD1-022 C Adder 12.01 MW 10.21 MW
960331 AF2-324 C Adder 9.23 MW 7.84 MW
961681 AG1-008 C Adder 21.19 MW 18.01 MW
962571 AG1-106 C Adder 3.94 MW 3.35 MW
316036 AC1-147 C 80/20 0.48 MW 0.48 MW
316072 AD1-144 C 80/20 0.34 MW 0.34 MW
316185 AD1-033 C 80/20 1.63 MW 1.63 MW
316210 AC1-098 C Adder 8.14 MW 6.92 MW
316212 AC1-099 C Adder 2.73 MW 2.32 MW
316246 AF1-032 C 80/20 0.37 MW 0.37 MW
316263 AC1-034 C Adder 8.77 MW 7.45 MW
316274 AC1-208 C Adder 11.93 MW 10.14 MW
316294 AC1-161 C 80/20 6.99 MW 6.99 MW
316305 AF2-043 C 80/20 0.45 MW 0.45 MW
316315 AB2-025 C 80/20 0.51 MW 0.51 MW
316316 AC1-027 C 80/20 0.41 MW 0.41 MW
316320 Y1-086 C 80/20 0.29 MW 0.29 MW
316321 Z2-027 C 80/20 0.48 MW 0.48 MW
963221 AG1-171 C Adder 1.85 MW 1.57 MW
963231 AG1-172 C Adder 1.85 MW 1.57 MW
963241 AG1-173 C Adder 1.85 MW 1.57 MW
316017 AA1-139 ULT1 80/20 1.43 MW 1.43 MW
316018 AA1-139 ULT2 80/20 1.43 MW 1.43 MW
315614 AA2-178 C 80/20 2.01 MW 2.01 MW
316375 AC2-012 C 80/20 1.76 MW 1.76 MW
316311 AC2-079 C Adder 7.32 MW 6.22 MW
316349 AD2-085 C Adder 4.35 MW 3.7 MW
316388 AE2-253 GEN 80/20 2.59 MW 2.59 MW
961611 AG1-000B C Adder 16.05 MW 13.64 MW
941591 AE2-156 C 80/20 25.18 MW 25.18 MW
944581 AF1-123 C 80/20 66.23 MW 66.23 MW
944591 AF1-124 C 80/20 66.47 MW 66.47 MW
944601 AF1-125 C 80/20 65.21 MW 65.21 MW
962491 AG1-098 C Adder 11.45 MW 9.73 MW
962561 AG1-105 C Adder 10.62 MW 9.02 MW
964241 AG1-285 C Adder 13.55 MW 11.51 MW
965601 AG1-428 C Adder 5.94 MW 5.05 MW
965691 AG1-437 C Adder 13.85 MW 11.77 MW
965701 AG1-438 C Adder 13.85 MW 11.77 MW
965711 AG1-439 C Adder 31.38 MW 26.67 MW
965741 AG1-442 C Adder 8.08 MW 6.87 MW
965751 AG1-443 C Adder 8.08 MW 6.87 MW
965761 AG1-444 C Adder 16.74 MW 14.22 MW
965811 AG1-449 C 80/20 39.53 MW 39.53 MW
313764 3SOCKMAN Adder 0.93 MW 0.79 MW
932631 AC2-084 C Adder 8.71 MW 7.4 MW
934321 AD1-056 C Adder 8.28 MW 7.04 MW
934331 AD1-057 C Adder 4.62 MW 3.93 MW
934501 AD1-074 C 80/20 46.33 MW 46.33 MW
934511 AD1-075 C 80/20 11.58 MW 11.58 MW
934611 AD1-087 C 80/20 1.69 MW 1.69 MW
935171 AD1-152 C 80/20 1.73 MW 1.73 MW
936161 AD2-022 C Adder 9.19 MW 7.82 MW
936171 AD2-023 C Adder 5.36 MW 4.56 MW
937481 AD2-202 C 80/20 0.49 MW 0.49 MW
938531 AE1-072 C 80/20 24.96 MW 24.96 MW
939191 AE1-149 C Adder 10.86 MW 9.23 MW
940481 AE2-033 C 80/20 21.62 MW 21.62 MW
940541 AE2-040 C 80/20 3.84 MW 3.84 MW
940641 AE2-051 C 80/20 29.83 MW 29.83 MW
941101 AE2-104 C 80/20 4.56 MW 4.56 MW
941281 AE2-122 C 80/20 40.33 MW 40.33 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 45.4 MW 45.4 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 31.31 MW 31.31 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 130.73 MW 130.73 MW
NY PJM->LTFIMP_NY CLTF 2.16 MW 2.16 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.8 MW 1.8 MW
WEC LTFEXP_WEC->PJM CLTF 0.94 MW 0.94 MW
CPLE LTFEXP_CPLE->PJM CLTF 15.67 MW 15.67 MW
TVA LTFEXP_TVA->PJM CLTF 8.39 MW 8.39 MW
MEC LTFEXP_MEC->PJM CLTF 5.6 MW 5.6 MW
LAGN LTFEXP_LAGN->PJM CLTF 10.65 MW 10.65 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.35 MW 0.35 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.47 MW 7.47 MW

Details for 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P4-2: SPOTS H1T594_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P4-2: SPOTS H1T594_SRT-S
CONTINGENCY 'DVP_P4-2: SPOTS H1T594_SRT-S'
 OPEN BRANCH FROM BUS 314755 TO BUS 314934 CKT 1                /*3SPOTSYL     115.0 - 8SPOTSYL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Breaker AC 116.8 3940.0 C 4602.03 111.73
Elimination
Base Case Details for Eliminated Flowgate 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P4-2: SPOTS H1T594_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C Adder 1.6 MW 1.36 MW
961792 AG1-021 E Adder 1.07 MW 0.91 MW
963041 AG1-153 C Adder 5.37 MW 4.56 MW
963042 AG1-153 E Adder 8.05 MW 6.84 MW
963171 AG1-166 C Adder 0.8 MW 0.68 MW
963172 AG1-166 E Adder 1.87 MW 1.59 MW
963181 AG1-167 C Adder 0.6 MW 0.51 MW
963182 AG1-167 E Adder 1.4 MW 1.19 MW
963191 AG1-168 C Adder 0.6 MW 0.51 MW
963192 AG1-168 E Adder 1.4 MW 1.19 MW
963201 AG1-169 C Adder 0.6 MW 0.51 MW
963202 AG1-169 E Adder 1.4 MW 1.19 MW
963211 AG1-170 C Adder 0.4 MW 0.34 MW
963212 AG1-170 E Adder 0.94 MW 0.8 MW
964111 AG1-272 C Adder 0.81 MW 0.69 MW
964112 AG1-272 E Adder 1.89 MW 1.6 MW
964121 AG1-273 C Adder 0.81 MW 0.69 MW
964122 AG1-273 E Adder 1.89 MW 1.6 MW
964131 AG1-274 C Adder 0.81 MW 0.69 MW
964132 AG1-274 E Adder 1.89 MW 1.6 MW
964791 AG1-342 C Adder 2.87 MW 2.44 MW
964792 AG1-342 E Adder 1.91 MW 1.63 MW
964801 AG1-343 C Adder 4.62 MW 3.92 MW
964802 AG1-343 E Adder 3.63 MW 3.08 MW
966811 AG1-552 C Adder 1.63 MW 1.39 MW
966812 AG1-552 E Adder 0.78 MW 0.66 MW
965191 AG1-384 C Adder 0.81 MW 0.69 MW
965192 AG1-384 E Adder 1.89 MW 1.6 MW
965291 AG1-394 C Adder 0.66 MW 0.56 MW
965292 AG1-394 E Adder 1.21 MW 1.03 MW
965591 AG1-427 C Adder 9.67 MW 8.22 MW
965592 AG1-427 E Adder 6.45 MW 5.48 MW
966621 AG1-532 C Adder 1.14 MW 0.97 MW
966622 AG1-532 E Adder 0.76 MW 0.64 MW
313853 3PONTONDP Adder 0.53 MW 0.45 MW
314541 3WATKINS Adder 0.53 MW 0.45 MW
314572 3EMPORIA Adder 0.35 MW 0.3 MW
314713 3PAMPLIN Adder 0.8 MW 0.68 MW
918492 AA1-063AE OP Adder 3.21 MW 2.73 MW
919692 AA2-053 E OP Adder 3.34 MW 2.84 MW
920042 AA2-088 E OP Adder 8.18 MW 6.96 MW
925785 AC1-054 E Adder 2.77 MW 2.36 MW
926274 AC1-105 E Adder 2.17 MW 1.85 MW
942931 AE2-313 C Adder 34.9 MW 29.66 MW
942932 AE2-313 E Adder 23.27 MW 19.78 MW
944011 AF1-069 C 50/50 12.66 MW 12.66 MW
944012 AF1-069 E 50/50 4.92 MW 4.92 MW
958801 AF2-171 C Adder 12.03 MW 10.22 MW
958802 AF2-171 E Adder 8.02 MW 6.82 MW
959311 AF2-222 C Adder 13.47 MW 11.45 MW
959312 AF2-222 E Adder 9.03 MW 7.67 MW
960081 AF2-299 C Adder 1.64 MW 1.4 MW
960082 AF2-299 E Adder 1.09 MW 0.93 MW
900672 V4-068 E Adder 0.28 MW 0.23 MW
923263 AB1-132 E OP Adder 4.86 MW 4.13 MW
923573 AB1-173 E OP Adder 2.64 MW 2.24 MW
924162 AB2-060 E OP Adder 3.49 MW 2.97 MW
924302 AB2-077 E O1 Adder 1.09 MW 0.93 MW
924312 AB2-078 E O1 Adder 1.09 MW 0.93 MW
924322 AB2-079 E O1 Adder 1.09 MW 0.93 MW
925612 AC1-036 E Adder 0.7 MW 0.59 MW
938371 AE1-056 C Adder 5.17 MW 4.39 MW
938372 AE1-056 E Adder 2.82 MW 2.4 MW
939181 AE1-148 C Adder 7.36 MW 6.26 MW
939182 AE1-148 E Adder 4.91 MW 4.17 MW
941031 AE2-094 C 50/50 38.75 MW 38.75 MW
941032 AE2-094 E 50/50 17.36 MW 17.36 MW
946281 AF1-292 C Adder 1.25 MW 1.07 MW
946282 AF1-292 E Adder 0.84 MW 0.71 MW
946301 AF1-294 C Adder 3.29 MW 2.79 MW
946302 AF1-294 E Adder 2.19 MW 1.86 MW
957481 AF2-042 C Adder 49.49 MW 42.07 MW
957482 AF2-042 E Adder 32.99 MW 28.05 MW
957521 AF2-046 C Adder 12.18 MW 10.36 MW
957522 AF2-046 E Adder 6.16 MW 5.23 MW
958211 AF2-115 C Adder 2.0 MW 1.7 MW
958212 AF2-115 E Adder 1.34 MW 1.14 MW
314539 3UNCAMP Adder 4.6 MW 3.91 MW
938771 AE1-103 C Adder 2.21 MW 1.88 MW
938772 AE1-103 E Adder 3.05 MW 2.59 MW
933502 AC2-165 E Adder 6.82 MW 5.79 MW
314331 6POE Adder 1.03 MW 0.88 MW
314507 3THOMPSN Adder 1.48 MW 1.26 MW
314550 6HICKORY Adder 1.61 MW 1.37 MW
926662 AC1-147 E Adder 0.97 MW 0.82 MW
926755 AC1-161 E Adder 9.52 MW 8.09 MW
943612 AF1-032 E Adder 0.68 MW 0.58 MW
958502 AF2-144 E Adder 1.14 MW 0.97 MW
315172 1LOISA A 50/50 2.87 MW 2.87 MW
315173 1LOISA B 50/50 2.89 MW 2.89 MW
315174 1LOISA C 50/50 2.89 MW 2.89 MW
315175 1LOISA D 50/50 2.89 MW 2.89 MW
315176 1LOISA E 50/50 5.88 MW 5.88 MW
315177 1S ANNAG1 50/50 2.84 MW 2.84 MW
315178 1S ANNAS1 50/50 1.46 MW 1.46 MW
315179 1S ANNAG2 50/50 2.84 MW 2.84 MW
315180 1S ANNAS2 50/50 1.46 MW 1.46 MW
315225 1N ANNA1 50/50 99.41 MW 99.41 MW
315226 1N ANNA2 50/50 99.45 MW 99.45 MW
315260 1GOSPORTA Adder 1.56 MW 1.33 MW
315261 1GOSPORTB Adder 1.99 MW 1.69 MW
315262 1GOSPORTC Adder 1.69 MW 1.44 MW
913392 Y1-086 E Adder 1.63 MW 1.39 MW
916192 Z1-068 E Adder 1.38 MW 1.18 MW
923832 AB2-022 E Adder 0.92 MW 0.78 MW
923852 AB2-025 E Adder 0.97 MW 0.82 MW
923862 AB2-026 E Adder 1.16 MW 0.98 MW
925022 AB2-158 E 50/50 11.37 MW 11.37 MW
938552 AE1-074 E Adder 1.08 MW 0.92 MW
938562 AE1-075 E Adder 0.99 MW 0.84 MW
957492 AF2-043 E Adder 1.05 MW 0.89 MW
966001 AG1-469 C 50/50 2.0 MW 2.0 MW
966002 AG1-469 E 50/50 1.0 MW 1.0 MW
901082 W1-029 E Adder 23.71 MW 20.15 MW
917122 Z2-027 E Adder 1.0 MW 0.85 MW
925522 AC1-027 E Adder 0.9 MW 0.76 MW
941501 AE2-147 C Adder 11.79 MW 10.02 MW
941502 AE2-147 E Adder 3.48 MW 2.96 MW
957871 AF2-081 C Adder 7.39 MW 6.29 MW
957872 AF2-081 E Adder 3.17 MW 2.69 MW
314722 3TWITTYS Adder 0.77 MW 0.66 MW
926071 AC1-086 C Adder 16.7 MW 14.19 MW
926072 AC1-086 E Adder 7.6 MW 6.46 MW
936261 AD2-033 C Adder 10.54 MW 8.96 MW
936262 AD2-033 E Adder 7.03 MW 5.97 MW
933291 AC2-141 C Adder 22.3 MW 18.96 MW
933292 AC2-141 E Adder 9.52 MW 8.09 MW
934621 AD1-088 C Adder 10.33 MW 8.78 MW
934622 AD1-088 E Adder 4.86 MW 4.13 MW
939411 AE1-173 C Adder 81.83 MW 69.56 MW
939412 AE1-173 E Adder 54.55 MW 46.37 MW
962572 AG1-106 E Adder 1.08 MW 0.92 MW
961681 AG1-008 C Adder 12.18 MW 10.36 MW
961682 AG1-008 E Adder 6.16 MW 5.23 MW
962571 AG1-106 C Adder 2.36 MW 2.01 MW
208900 BRIS G1 50/50 -2.32 MW -2.32 MW
208901 BRIS G2 50/50 -2.74 MW -2.74 MW
314632 6AYDLETT TAP Adder 1.0 MW 0.85 MW
316192 AB2-158 C 50/50 3.99 MW 3.99 MW
316233 AE1-074 C Adder 2.14 MW 1.82 MW
316336 AC2-165 C Adder 9.06 MW 7.7 MW
924516 AB2-100 E1 Adder 2.35 MW 2.0 MW
924517 AB2-100 E2 Adder 2.35 MW 2.0 MW
934065 AD1-033 E Adder 3.7 MW 3.15 MW
937226 AE2-253 E Adder 4.32 MW 3.67 MW
919153 AA1-139 E2 Adder 3.02 MW 2.57 MW
919152 AA1-139 E1 Adder 3.02 MW 2.57 MW
923994 AB2-040_E Adder 4.94 MW 4.2 MW
924022 AB2-043 E O1 Adder 4.23 MW 3.6 MW
316088 AB2-174 E Adder 5.25 MW 4.46 MW
316044 AC1-158 C1 50/50 18.25 MW 18.25 MW
316045 AC1-158 C2 50/50 18.25 MW 18.25 MW
926739 AC1-158 E1 50/50 51.19 MW 51.19 MW
926740 AC1-158 E2 50/50 51.19 MW 51.19 MW
932046 AC2-012 E Adder 9.59 MW 8.15 MW
941591 AE2-156 C Adder 13.12 MW 11.15 MW
944581 AF1-123 C Adder 33.84 MW 28.76 MW
944582 AF1-123 E Adder 77.49 MW 65.86 MW
944591 AF1-124 C Adder 33.96 MW 28.86 MW
944592 AF1-124 E Adder 77.77 MW 66.1 MW
944601 AF1-125 C Adder 33.32 MW 28.32 MW
944602 AF1-125 E Adder 76.27 MW 64.83 MW
957431 AF2-037 C 50/50 28.48 MW 28.48 MW
957432 AF2-037 E 50/50 18.98 MW 18.98 MW
957691 AF2-063 C 50/50 45.44 MW 45.44 MW
957692 AF2-063 E 50/50 30.29 MW 30.29 MW
962491 AG1-098 C Adder 9.31 MW 7.91 MW
962492 AG1-098 E Adder 6.2 MW 5.27 MW
962561 AG1-105 C Adder 7.21 MW 6.12 MW
962562 AG1-105 E Adder 4.8 MW 4.08 MW
964241 AG1-285 C Adder 10.19 MW 8.66 MW
964242 AG1-285 E Adder 6.79 MW 5.78 MW
964421 AG1-305 C 50/50 19.09 MW 19.09 MW
964422 AG1-305 E 50/50 12.72 MW 12.72 MW
965601 AG1-428 C Adder 3.9 MW 3.31 MW
965602 AG1-428 E Adder 2.6 MW 2.21 MW
965811 AG1-449 C Adder 22.6 MW 19.21 MW
965831 AG1-451 C Adder 2.64 MW 2.24 MW
313764 3SOCKMAN Adder 0.57 MW 0.48 MW
934612 AD1-087 E Adder 3.24 MW 2.75 MW
935172 AD1-152 E Adder 4.75 MW 4.04 MW
937482 AD2-202 E Adder 0.95 MW 0.81 MW
938531 AE1-072 C Adder 13.01 MW 11.06 MW
938532 AE1-072 E Adder 6.78 MW 5.76 MW
940481 AE2-033 C Adder 13.48 MW 11.46 MW
940482 AE2-033 E Adder 9.09 MW 7.72 MW
940541 AE2-040 C Adder 2.4 MW 2.04 MW
940641 AE2-051 C Adder 16.48 MW 14.01 MW
940642 AE2-051 E Adder 10.99 MW 9.34 MW
941281 AE2-122 C Adder 20.94 MW 17.8 MW
941282 AE2-122 E Adder 84.5 MW 71.83 MW
942461 AE2-259 C Adder 7.91 MW 6.73 MW
942462 AE2-259 E Adder 5.28 MW 4.48 MW
316303 AF2-085 50/50 4.01 MW 4.01 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 19.75 MW 19.75 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.72 MW 16.72 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 76.98 MW 76.98 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.07 MW 5.07 MW
NY PJM->LTFIMP_NY CLTF 2.38 MW 2.38 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.86 MW 0.86 MW
WEC LTFEXP_WEC->PJM CLTF 0.43 MW 0.43 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.24 MW 9.24 MW
TVA LTFEXP_TVA->PJM CLTF 4.7 MW 4.7 MW
MEC LTFEXP_MEC->PJM CLTF 2.76 MW 2.76 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.93 MW 5.93 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.17 MW 0.17 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 32.27 MW 32.27 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.4 MW 4.4 MW

Details for 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P4-2: 563T576_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: 563T576_SRT-S
CONTINGENCY 'DVP_P4-2: 563T576_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 111.33 3144.0 C 3500.17 251.96
Elimination
Base Case Details for Eliminated Flowgate 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P4-2: 563T576_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.64 MW 0.55 MW
961942 AG1-037 E Adder 0.43 MW 0.36 MW
962331 AG1-082 C Adder 2.58 MW 2.19 MW
962332 AG1-082 E Adder 1.72 MW 1.46 MW
962341 AG1-083 C Adder 2.58 MW 2.19 MW
962342 AG1-083 E Adder 1.72 MW 1.46 MW
963041 AG1-153 C Adder 6.76 MW 5.75 MW
963042 AG1-153 E Adder 10.14 MW 8.62 MW
964801 AG1-343 C Adder 7.63 MW 6.48 MW
964802 AG1-343 E Adder 5.99 MW 5.09 MW
966801 AG1-551 C Adder 2.62 MW 2.23 MW
966802 AG1-551 E Adder 1.38 MW 1.17 MW
966811 AG1-552 C Adder 2.33 MW 1.98 MW
966812 AG1-552 E Adder 1.11 MW 0.94 MW
965291 AG1-394 C Adder 1.09 MW 0.93 MW
965292 AG1-394 E Adder 2.01 MW 1.71 MW
314541 3WATKINS Adder 0.93 MW 0.79 MW
918492 AA1-063AE OP Adder 4.86 MW 4.13 MW
918532 AA1-067 E Adder 0.87 MW 0.74 MW
919692 AA2-053 E OP Adder 4.89 MW 4.16 MW
920042 AA2-088 E OP Adder 13.64 MW 11.6 MW
934521 AD1-076 C Adder 16.95 MW 14.41 MW
934522 AD1-076 E Adder 8.64 MW 7.34 MW
942931 AE2-313 C Adder 43.91 MW 37.33 MW
942932 AE2-313 E Adder 29.28 MW 24.88 MW
943172 AE2-346 E Adder 0.77 MW 0.66 MW
944011 AF1-069 C Adder 16.0 MW 13.6 MW
944012 AF1-069 E Adder 6.22 MW 5.28 MW
316141 AB2-099 E Adder 0.32 MW 0.27 MW
900672 V4-068 E Adder 0.46 MW 0.39 MW
923263 AB1-132 E OP Adder 6.86 MW 5.83 MW
940492 AE2-034 E Adder 4.41 MW 3.75 MW
941031 AE2-094 C Adder 48.97 MW 41.63 MW
941032 AE2-094 E Adder 21.93 MW 18.64 MW
957481 AF2-042 C Adder 59.85 MW 50.88 MW
957482 AF2-042 E Adder 39.9 MW 33.92 MW
957521 AF2-046 C Adder 20.12 MW 17.1 MW
957522 AF2-046 E Adder 10.17 MW 8.64 MW
314539 3UNCAMP Adder 8.34 MW 7.09 MW
916042 Z1-036 E Adder 43.08 MW 36.62 MW
938771 AE1-103 C Adder 4.07 MW 3.46 MW
938772 AE1-103 E Adder 5.62 MW 4.77 MW
314507 3THOMPSN Adder 3.23 MW 2.75 MW
314525 6KINGFORK Adder 1.49 MW 1.27 MW
314550 6HICKORY 50/50 3.54 MW 3.54 MW
315092 1YORKTN3 Adder 182.87 MW 155.44 MW
926662 AC1-147 E 50/50 2.12 MW 2.12 MW
926755 AC1-161 E 50/50 24.42 MW 24.42 MW
935112 AD1-144 E Adder 1.39 MW 1.18 MW
942341 AE2-247 C Adder 1.93 MW 1.64 MW
942342 AE2-247 E Adder 2.67 MW 2.27 MW
943461 AF1-017 C Adder 1.75 MW 1.49 MW
943462 AF1-017 E Adder 2.85 MW 2.43 MW
943612 AF1-032 E Adder 1.44 MW 1.22 MW
944871 AF1-152 C Adder 8.12 MW 6.9 MW
944872 AF1-152 E Adder 5.41 MW 4.6 MW
315098 1CHESPKA 50/50 0.65 MW 0.65 MW
315099 1CHESPKB 50/50 1.07 MW 1.07 MW
315108 1ELIZAR1 50/50 4.79 MW 4.79 MW
315109 1ELIZAR2 50/50 4.7 MW 4.7 MW
315110 1ELIZAR3 50/50 4.85 MW 4.85 MW
315233 1SURRY 2 50/50 48.54 MW 48.54 MW
315260 1GOSPORTA Adder 3.41 MW 2.9 MW
315261 1GOSPORTB 50/50 4.36 MW 4.36 MW
315262 1GOSPORTC 50/50 3.7 MW 3.7 MW
913392 Y1-086 E Adder 3.46 MW 2.94 MW
916192 Z1-068 E 50/50 3.04 MW 3.04 MW
923832 AB2-022 E Adder 1.95 MW 1.66 MW
939312 AE1-162 E Adder 1.89 MW 1.61 MW
957492 AF2-043 E Adder 2.21 MW 1.88 MW
901082 W1-029 E Adder 48.97 MW 41.63 MW
917122 Z2-027 E Adder 2.09 MW 1.78 MW
925522 AC1-027 E 50/50 1.97 MW 1.97 MW
941501 AE2-147 C Adder 24.35 MW 20.7 MW
941502 AE2-147 E Adder 16.23 MW 13.8 MW
957871 AF2-081 C 50/50 16.07 MW 16.07 MW
957872 AF2-081 E 50/50 6.88 MW 6.88 MW
958161 AF2-110 C Adder 2.01 MW 1.71 MW
958162 AF2-110 E Adder 3.2 MW 2.72 MW
926071 AC1-086 C Adder 23.56 MW 20.02 MW
926072 AC1-086 E Adder 10.72 MW 9.11 MW
933291 AC2-141 C 50/50 57.21 MW 57.21 MW
933292 AC2-141 E 50/50 24.42 MW 24.42 MW
939411 AE1-173 C Adder 130.27 MW 110.73 MW
939412 AE1-173 E Adder 86.85 MW 73.82 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 11.96 MW 10.16 MW
933982 AD1-022 E Adder 6.51 MW 5.53 MW
962572 AG1-106 E Adder 1.52 MW 1.29 MW
961681 AG1-008 C Adder 20.12 MW 17.1 MW
961682 AG1-008 E Adder 10.17 MW 8.64 MW
962571 AG1-106 C Adder 3.33 MW 2.83 MW
314594 6PLYMOUTH TP Adder 0.45 MW 0.38 MW
314632 6AYDLETT TAP Adder 2.17 MW 1.84 MW
316036 AC1-147 C 50/50 0.55 MW 0.55 MW
316185 AD1-033 C 50/50 1.85 MW 1.85 MW
316210 AC1-098 C Adder 7.16 MW 6.09 MW
316212 AC1-099 C Adder 2.4 MW 2.04 MW
316294 AC1-161 C 50/50 8.66 MW 8.66 MW
316316 AC1-027 C 50/50 0.47 MW 0.47 MW
917332 KELFORD E Adder 2.04 MW 1.73 MW
926206 AC1-098 E Adder 4.27 MW 3.63 MW
926214 AC1-099 E Adder 1.41 MW 1.2 MW
934065 AD1-033 E 50/50 8.17 MW 8.17 MW
937226 AE2-253 E 50/50 9.43 MW 9.43 MW
918512 AA1-065 E OP Adder 7.23 MW 6.15 MW
316017 AA1-139 ULT1 50/50 1.61 MW 1.61 MW
316018 AA1-139 ULT2 50/50 1.61 MW 1.61 MW
919153 AA1-139 E2 50/50 6.57 MW 6.57 MW
919152 AA1-139 E1 50/50 6.57 MW 6.57 MW
920692 AA2-178 E Adder 5.87 MW 4.99 MW
925122 AB2-169 E Adder 7.5 MW 6.37 MW
316375 AC2-012 C 50/50 2.01 MW 2.01 MW
932046 AC2-012 E 50/50 20.99 MW 20.99 MW
316311 AC2-079 C Adder 7.56 MW 6.42 MW
932596 AC2-079 E Adder 12.33 MW 10.48 MW
316349 AD2-085 C Adder 4.46 MW 3.79 MW
936666 AD2-085 E Adder 7.28 MW 6.19 MW
316388 AE2-253 GEN 50/50 2.94 MW 2.94 MW
961611 AG1-000B C Adder 16.94 MW 14.4 MW
941591 AE2-156 C 50/50 28.76 MW 28.76 MW
944581 AF1-123 C 50/50 76.31 MW 76.31 MW
944582 AF1-123 E 50/50 174.74 MW 174.74 MW
944591 AF1-124 C 50/50 76.58 MW 76.58 MW
944592 AF1-124 E 50/50 175.38 MW 175.38 MW
944601 AF1-125 C 50/50 75.14 MW 75.14 MW
944602 AF1-125 E 50/50 172.0 MW 172.0 MW
965691 AG1-437 C Adder 13.66 MW 11.62 MW
965692 AG1-437 E Adder 9.11 MW 7.74 MW
965701 AG1-438 C Adder 13.66 MW 11.62 MW
965702 AG1-438 E Adder 9.11 MW 7.74 MW
965741 AG1-442 C Adder 7.97 MW 6.78 MW
965751 AG1-443 C Adder 7.97 MW 6.78 MW
965811 AG1-449 C Adder 28.44 MW 24.17 MW
313764 3SOCKMAN Adder 0.79 MW 0.67 MW
932631 AC2-084 C Adder 7.66 MW 6.51 MW
932632 AC2-084 E Adder 3.77 MW 3.21 MW
934501 AD1-074 C Adder 46.67 MW 39.67 MW
934502 AD1-074 E Adder 23.76 MW 20.19 MW
934511 AD1-075 C Adder 11.67 MW 9.92 MW
934512 AD1-075 E Adder 5.94 MW 5.05 MW
934612 AD1-087 E Adder 2.05 MW 1.75 MW
938531 AE1-072 C Adder 28.13 MW 23.91 MW
938532 AE1-072 E Adder 14.66 MW 12.46 MW
940641 AE2-051 C Adder 23.73 MW 20.17 MW
940642 AE2-051 E Adder 15.82 MW 13.45 MW
941101 AE2-104 C Adder 4.93 MW 4.19 MW
941102 AE2-104 E Adder 7.83 MW 6.66 MW
941281 AE2-122 C 50/50 45.99 MW 45.99 MW
941282 AE2-122 E 50/50 185.59 MW 185.59 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 28.45 MW 28.45 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 21.5 MW 21.5 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 97.73 MW 97.73 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.5 MW 3.5 MW
NY PJM->LTFIMP_NY CLTF 1.64 MW 1.64 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.14 MW 1.14 MW
WEC LTFEXP_WEC->PJM CLTF 0.59 MW 0.59 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.98 MW 11.98 MW
TVA LTFEXP_TVA->PJM CLTF 5.89 MW 5.89 MW
MEC LTFEXP_MEC->PJM CLTF 3.68 MW 3.68 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.51 MW 7.51 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.23 MW 0.23 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 22.29 MW 22.29 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.71 MW 5.71 MW

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P4-2: H1T575_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P4-2: H1T575_SRT-S
CONTINGENCY 'DVP_P4-2: H1T575_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 1                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1                /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 115.3 3940.0 C 4542.79 131.87
Elimination
Base Case Details for Eliminated Flowgate 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P4-2: H1T575_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C Adder 5.55 MW 4.72 MW
963042 AG1-153 E Adder 8.33 MW 7.08 MW
964801 AG1-343 C Adder 5.24 MW 4.46 MW
964802 AG1-343 E Adder 4.12 MW 3.5 MW
966811 AG1-552 C Adder 1.81 MW 1.54 MW
966812 AG1-552 E Adder 0.86 MW 0.73 MW
965291 AG1-394 C Adder 0.75 MW 0.64 MW
965292 AG1-394 E Adder 1.38 MW 1.17 MW
966621 AG1-532 C Adder 1.25 MW 1.06 MW
966622 AG1-532 E Adder 0.83 MW 0.71 MW
314541 3WATKINS Adder 0.61 MW 0.52 MW
314572 3EMPORIA Adder 0.38 MW 0.33 MW
918492 AA1-063AE OP Adder 3.59 MW 3.05 MW
919692 AA2-053 E OP Adder 3.72 MW 3.16 MW
920042 AA2-088 E OP Adder 9.31 MW 7.91 MW
942931 AE2-313 C Adder 36.02 MW 30.62 MW
942932 AE2-313 E Adder 24.01 MW 20.41 MW
944011 AF1-069 C 50/50 13.06 MW 13.06 MW
944012 AF1-069 E 50/50 5.07 MW 5.07 MW
960081 AF2-299 C Adder 1.81 MW 1.53 MW
960082 AF2-299 E Adder 1.2 MW 1.02 MW
900672 V4-068 E Adder 0.31 MW 0.27 MW
923263 AB1-132 E OP Adder 5.39 MW 4.58 MW
923573 AB1-173 E OP Adder 2.91 MW 2.47 MW
940492 AE2-034 E Adder 2.69 MW 2.29 MW
941031 AE2-094 C 50/50 39.97 MW 39.97 MW
941032 AE2-094 E 50/50 17.9 MW 17.9 MW
946281 AF1-292 C Adder 1.38 MW 1.17 MW
946282 AF1-292 E Adder 0.92 MW 0.78 MW
957481 AF2-042 C Adder 51.49 MW 43.77 MW
957482 AF2-042 E Adder 34.33 MW 29.18 MW
957521 AF2-046 C Adder 13.81 MW 11.74 MW
957522 AF2-046 E Adder 6.98 MW 5.93 MW
314539 3UNCAMP Adder 5.33 MW 4.53 MW
916042 Z1-036 E Adder 25.05 MW 21.29 MW
938771 AE1-103 C Adder 2.56 MW 2.18 MW
938772 AE1-103 E Adder 3.54 MW 3.01 MW
933502 AC2-165 E Adder 7.16 MW 6.09 MW
314331 6POE Adder 1.21 MW 1.03 MW
314507 3THOMPSN Adder 1.76 MW 1.49 MW
314525 6KINGFORK Adder 0.87 MW 0.74 MW
314550 6HICKORY Adder 1.9 MW 1.62 MW
315083 1SPRUNCA Adder 7.56 MW 6.43 MW
315084 1SPRUNCB Adder 7.56 MW 6.43 MW
926662 AC1-147 E Adder 1.15 MW 0.98 MW
926755 AC1-161 E Adder 11.32 MW 9.62 MW
934861 AD1-115 C Adder 2.84 MW 2.42 MW
934862 AD1-115 E Adder 4.64 MW 3.94 MW
935112 AD1-144 E Adder 0.81 MW 0.69 MW
942341 AE2-247 C Adder 1.3 MW 1.1 MW
942342 AE2-247 E Adder 1.79 MW 1.52 MW
943461 AF1-017 C Adder 1.17 MW 1.0 MW
943462 AF1-017 E Adder 1.91 MW 1.63 MW
943612 AF1-032 E Adder 0.81 MW 0.69 MW
944871 AF1-152 C Adder 4.61 MW 3.92 MW
944872 AF1-152 E Adder 3.08 MW 2.61 MW
958502 AF2-144 E Adder 1.19 MW 1.01 MW
315172 1LOISA A 50/50 2.5 MW 2.5 MW
315173 1LOISA B 50/50 2.51 MW 2.51 MW
315174 1LOISA C 50/50 2.51 MW 2.51 MW
315175 1LOISA D 50/50 2.51 MW 2.51 MW
315176 1LOISA E 50/50 5.12 MW 5.12 MW
315177 1S ANNAG1 50/50 2.46 MW 2.46 MW
315178 1S ANNAS1 50/50 1.26 MW 1.26 MW
315179 1S ANNAG2 50/50 2.46 MW 2.46 MW
315180 1S ANNAS2 50/50 1.26 MW 1.26 MW
315225 1N ANNA1 50/50 82.8 MW 82.8 MW
315226 1N ANNA2 50/50 82.83 MW 82.83 MW
315260 1GOSPORTA Adder 1.86 MW 1.58 MW
315261 1GOSPORTB Adder 2.37 MW 2.01 MW
315262 1GOSPORTC Adder 2.01 MW 1.71 MW
913392 Y1-086 E Adder 1.92 MW 1.63 MW
916192 Z1-068 E Adder 1.64 MW 1.39 MW
923832 AB2-022 E Adder 1.08 MW 0.92 MW
923852 AB2-025 E Adder 1.07 MW 0.91 MW
923862 AB2-026 E Adder 1.21 MW 1.03 MW
925022 AB2-158 E 50/50 9.62 MW 9.62 MW
938552 AE1-074 E Adder 1.21 MW 1.03 MW
938562 AE1-075 E Adder 1.04 MW 0.88 MW
939312 AE1-162 E Adder 1.19 MW 1.01 MW
957492 AF2-043 E Adder 1.24 MW 1.05 MW
966001 AG1-469 C 50/50 1.96 MW 1.96 MW
966002 AG1-469 E 50/50 0.98 MW 0.98 MW
901082 W1-029 E Adder 27.83 MW 23.66 MW
917122 Z2-027 E Adder 1.17 MW 1.0 MW
925522 AC1-027 E Adder 1.06 MW 0.9 MW
925672 AC1-043 E Adder 9.28 MW 7.88 MW
941501 AE2-147 C Adder 13.84 MW 11.76 MW
941502 AE2-147 E Adder 9.23 MW 7.84 MW
942001 AE2-212 C Adder 1.81 MW 1.54 MW
942002 AE2-212 E Adder 1.21 MW 1.03 MW
957871 AF2-081 C Adder 8.73 MW 7.42 MW
957872 AF2-081 E Adder 3.74 MW 3.18 MW
958161 AF2-110 C Adder 1.19 MW 1.01 MW
958162 AF2-110 E Adder 1.9 MW 1.61 MW
966331 AG1-502 C 50/50 14.26 MW 14.26 MW
966332 AG1-502 E 50/50 3.56 MW 3.56 MW
966341 AG1-503 C 50/50 3.56 MW 3.56 MW
966342 AG1-503 E 50/50 0.89 MW 0.89 MW
926071 AC1-086 C Adder 18.53 MW 15.75 MW
926072 AC1-086 E Adder 8.43 MW 7.17 MW
933291 AC2-141 C Adder 26.52 MW 22.55 MW
933292 AC2-141 E Adder 11.32 MW 9.62 MW
934621 AD1-088 C Adder 10.88 MW 9.25 MW
934622 AD1-088 E Adder 5.12 MW 4.35 MW
939411 AE1-173 C Adder 88.06 MW 74.86 MW
939412 AE1-173 E Adder 58.71 MW 49.9 MW
962572 AG1-106 E Adder 1.2 MW 1.02 MW
961681 AG1-008 C Adder 13.81 MW 11.74 MW
961682 AG1-008 E Adder 6.98 MW 5.93 MW
962571 AG1-106 C Adder 2.62 MW 2.23 MW
208900 BRIS G1 50/50 -2.45 MW -2.45 MW
208901 BRIS G2 50/50 -2.9 MW -2.9 MW
314594 6PLYMOUTH TP Adder 0.28 MW 0.24 MW
314632 6AYDLETT TAP Adder 1.18 MW 1.01 MW
316164 AC1-076_C 50/50 1.03 MW 1.03 MW
316170 AC1-121 C 50/50 2.72 MW 2.72 MW
316192 AB2-158 C 50/50 3.38 MW 3.38 MW
316233 AE1-074 C Adder 2.4 MW 2.04 MW
316254 AC1-120 C 50/50 7.92 MW 7.92 MW
316257 AC1-043 C Adder 5.68 MW 4.83 MW
316336 AC2-165 C Adder 9.51 MW 8.09 MW
924516 AB2-100 E1 Adder 2.6 MW 2.21 MW
924517 AB2-100 E2 Adder 2.6 MW 2.21 MW
934065 AD1-033 E Adder 4.38 MW 3.73 MW
937226 AE2-253 E Adder 5.1 MW 4.34 MW
926004 AC1-076_E 50/50 6.38 MW 6.38 MW
926486 AC1-120 E 50/50 4.08 MW 4.08 MW
926502 AC1-121 E 50/50 1.28 MW 1.28 MW
919153 AA1-139 E2 Adder 3.57 MW 3.03 MW
919152 AA1-139 E1 Adder 3.57 MW 3.03 MW
920692 AA2-178 E Adder 3.59 MW 3.05 MW
923994 AB2-040_E Adder 5.46 MW 4.64 MW
316084 AB2-161 E Adder 4.77 MW 4.06 MW
316088 AB2-174 E Adder 5.79 MW 4.92 MW
316044 AC1-158 C1 50/50 18.11 MW 18.11 MW
316045 AC1-158 C2 50/50 18.11 MW 18.11 MW
926739 AC1-158 E1 50/50 50.77 MW 50.77 MW
926740 AC1-158 E2 50/50 50.77 MW 50.77 MW
932046 AC2-012 E Adder 11.41 MW 9.7 MW
316311 AC2-079 C Adder 4.99 MW 4.24 MW
932596 AC2-079 E Adder 8.14 MW 6.92 MW
934576 AD1-082 E Adder 3.8 MW 3.23 MW
316349 AD2-085 C Adder 2.99 MW 2.54 MW
936666 AD2-085 E Adder 4.88 MW 4.15 MW
941591 AE2-156 C Adder 15.6 MW 13.26 MW
944581 AF1-123 C Adder 39.94 MW 33.95 MW
944582 AF1-123 E Adder 91.45 MW 77.74 MW
944591 AF1-124 C Adder 40.08 MW 34.07 MW
944592 AF1-124 E Adder 91.79 MW 78.02 MW
944601 AF1-125 C Adder 39.32 MW 33.42 MW
944602 AF1-125 E Adder 90.02 MW 76.52 MW
957431 AF2-037 C 50/50 23.94 MW 23.94 MW
957432 AF2-037 E 50/50 15.96 MW 15.96 MW
957691 AF2-063 C 50/50 38.2 MW 38.2 MW
957692 AF2-063 E 50/50 25.47 MW 25.47 MW
962491 AG1-098 C Adder 9.8 MW 8.33 MW
962492 AG1-098 E Adder 6.53 MW 5.55 MW
964421 AG1-305 C 50/50 16.04 MW 16.04 MW
964422 AG1-305 E 50/50 10.7 MW 10.7 MW
965601 AG1-428 C Adder 4.24 MW 3.6 MW
965602 AG1-428 E Adder 2.83 MW 2.4 MW
965811 AG1-449 C Adder 23.33 MW 19.83 MW
313764 3SOCKMAN Adder 0.63 MW 0.54 MW
934501 AD1-074 C Adder 29.38 MW 24.98 MW
934502 AD1-074 E Adder 2.31 MW 1.96 MW
934612 AD1-087 E Adder 3.38 MW 2.87 MW
935172 AD1-152 E Adder 4.98 MW 4.23 MW
937482 AD2-202 E Adder 0.99 MW 0.84 MW
938531 AE1-072 C Adder 15.35 MW 13.05 MW
938532 AE1-072 E Adder 8.0 MW 6.8 MW
939191 AE1-149 C Adder 9.22 MW 7.84 MW
939192 AE1-149 E Adder 6.15 MW 5.22 MW
940481 AE2-033 C Adder 14.86 MW 12.63 MW
940482 AE2-033 E Adder 10.02 MW 8.52 MW
940541 AE2-040 C Adder 2.64 MW 2.25 MW
940641 AE2-051 C 50/50 17.31 MW 17.31 MW
940642 AE2-051 E 50/50 11.54 MW 11.54 MW
941101 AE2-104 C Adder 2.93 MW 2.49 MW
941102 AE2-104 E Adder 4.65 MW 3.95 MW
941281 AE2-122 C Adder 24.83 MW 21.11 MW
941282 AE2-122 E Adder 100.2 MW 85.17 MW
316303 AF2-085 50/50 4.17 MW 4.17 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 21.55 MW 21.55 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 18.35 MW 18.35 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 83.31 MW 83.31 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.37 MW 5.37 MW
NY PJM->LTFIMP_NY CLTF 2.54 MW 2.54 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.96 MW 0.96 MW
WEC LTFEXP_WEC->PJM CLTF 0.47 MW 0.47 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.94 MW 9.94 MW
TVA LTFEXP_TVA->PJM CLTF 5.17 MW 5.17 MW
MEC LTFEXP_MEC->PJM CLTF 3.02 MW 3.02 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.5 MW 6.5 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.19 MW 0.19 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 34.21 MW 34.21 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.74 MW 4.74 MW

Details for 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Single AC 104.85 3220.44 B 3376.72 39.87
Elimination
Base Case Details for Eliminated Flowgate 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.42 MW 0.35 MW
962331 AG1-082 C Adder 1.66 MW 1.41 MW
962341 AG1-083 C Adder 1.66 MW 1.41 MW
963041 AG1-153 C Adder 4.27 MW 3.63 MW
964801 AG1-343 C Adder 4.94 MW 4.2 MW
965291 AG1-394 C Adder 0.71 MW 0.6 MW
966621 AG1-532 C Adder 1.11 MW 0.95 MW
934521 AD1-076 C Adder 10.25 MW 8.72 MW
942931 AE2-313 C Adder 27.48 MW 23.36 MW
944011 AF1-069 C Adder 9.94 MW 8.45 MW
960081 AF2-299 C Adder 1.61 MW 1.37 MW
941031 AE2-094 C Adder 30.41 MW 25.85 MW
946281 AF1-292 C Adder 1.23 MW 1.04 MW
957521 AF2-046 C Adder 13.01 MW 11.06 MW
938771 AE1-103 C Adder 2.5 MW 2.12 MW
314229 6MT RD221 80/20 0.11 MW 0.11 MW
314236 6NRTHEST 80/20 0.16 MW 0.16 MW
314309 6IRON208 80/20 0.38 MW 0.38 MW
314507 3THOMPSN Adder 1.77 MW 1.5 MW
315039 1LDYSMT3 80/20 4.07 MW 4.07 MW
315040 1LDYSMT4 80/20 4.08 MW 4.08 MW
315041 1LDYSMT5 80/20 4.09 MW 4.09 MW
315060 1CHESTF5 80/20 58.18 MW 58.18 MW
315061 1CHESTG7 80/20 3.29 MW 3.29 MW
315062 1CHESTS7 80/20 1.51 MW 1.51 MW
315063 1CHESTG8 80/20 3.24 MW 3.24 MW
315064 1CHESTS8 80/20 1.67 MW 1.67 MW
315065 1CHESTF6 Adder 17.76 MW 15.1 MW
315067 1DARBY 1 80/20 2.19 MW 2.19 MW
315068 1DARBY 2 80/20 2.2 MW 2.2 MW
315069 1DARBY 3 80/20 2.21 MW 2.21 MW
315070 1DARBY 4 80/20 2.21 MW 2.21 MW
315073 1STONECA Adder 6.26 MW 5.32 MW
315083 1SPRUNCA Adder 8.23 MW 6.99 MW
315084 1SPRUNCB Adder 8.23 MW 6.99 MW
315092 1YORKTN3 Adder 126.51 MW 107.54 MW
936591 AD2-074 C Adder 4.72 MW 4.01 MW
942341 AE2-247 C Adder 1.3 MW 1.11 MW
943461 AF1-017 C Adder 1.18 MW 1.0 MW
943741 AF1-042 C Adder 2.47 MW 2.1 MW
944871 AF1-152 C Adder 4.56 MW 3.88 MW
960091 AF2-300 C 80/20 2.05 MW 2.05 MW
961951 AG1-038 C Adder 2.73 MW 2.32 MW
966661 AG1-536 C Adder 4.52 MW 3.84 MW
966871 AG1-558 C Adder 2.19 MW 1.86 MW
966881 AG1-559 C 80/20 2.27 MW 2.27 MW
315225 1N ANNA1 80/20 24.31 MW 24.31 MW
315226 1N ANNA2 80/20 24.32 MW 24.32 MW
315260 1GOSPORTA Adder 1.87 MW 1.59 MW
315261 1GOSPORTB Adder 2.39 MW 2.03 MW
315262 1GOSPORTC Adder 2.02 MW 1.72 MW
316075 AC2-137 C 80/20 0.33 MW 0.33 MW
957411 AF2-035 C 80/20 8.2 MW 8.2 MW
957601 AF2-054 C Adder 1.85 MW 1.57 MW
962861 AG1-135 C Adder 5.11 MW 4.35 MW
962971 AG1-146 C Adder 2.63 MW 2.24 MW
962981 AG1-147 C Adder 6.15 MW 5.22 MW
963051 AG1-154 C 80/20 3.37 MW 3.37 MW
964211 AG1-282 C Adder 1.67 MW 1.42 MW
941501 AE2-147 C Adder 13.69 MW 11.64 MW
942001 AE2-212 C Adder 1.92 MW 1.64 MW
957871 AF2-081 C Adder 8.7 MW 7.39 MW
958161 AF2-110 C Adder 1.19 MW 1.01 MW
933291 AC2-141 C Adder 26.7 MW 22.7 MW
939411 AE1-173 C Adder 73.6 MW 62.56 MW
934011 AD1-025 C Adder 15.18 MW 12.9 MW
927041 AC1-191 C Adder 8.8 MW 7.48 MW
933981 AD1-022 C Adder 7.31 MW 6.22 MW
961681 AG1-008 C Adder 13.01 MW 11.06 MW
316004 AC1-112 C 80/20 0.28 MW 0.28 MW
316169 AC1-164 GEN 80/20 5.64 MW 5.64 MW
316233 AE1-074 C Adder 2.16 MW 1.83 MW
316240 AF1-291 C Adder 1.95 MW 1.66 MW
316301 AE2-228 C Adder 1.94 MW 1.65 MW
316304 AE2-227 C 80/20 2.0 MW 2.0 MW
316312 AB1-027 C 80/20 0.46 MW 0.46 MW
963221 AG1-171 C Adder 1.93 MW 1.64 MW
963231 AG1-172 C Adder 1.93 MW 1.64 MW
963241 AG1-173 C Adder 1.93 MW 1.64 MW
315037 1LDYSMT1 80/20 3.92 MW 3.92 MW
315038 1LDYSMT2 80/20 3.97 MW 3.97 MW
315051 AA1-145 CT1 80/20 4.36 MW 4.36 MW
315052 AA1-145 CT2 80/20 4.35 MW 4.35 MW
316427 AG1-213 C 80/20 0.68 MW 0.68 MW
315043 1FOUR RIVERA 80/20 2.73 MW 2.73 MW
315044 1FOUR RIVERB 80/20 2.73 MW 2.73 MW
315045 1FOUR RIVERC 80/20 3.34 MW 3.34 MW
315046 1FOUR RIVERD 80/20 2.69 MW 2.69 MW
315047 1FOUR RIVERE 80/20 2.69 MW 2.69 MW
315048 1FOUR RIVERF 80/20 3.29 MW 3.29 MW
316311 AC2-079 C Adder 5.01 MW 4.26 MW
316349 AD2-085 C Adder 3.01 MW 2.56 MW
961611 AG1-000B C Adder 14.24 MW 12.11 MW
941591 AE2-156 C Adder 15.7 MW 13.35 MW
942371 AE2-250 C Adder 8.69 MW 7.39 MW
944581 AF1-123 C Adder 39.73 MW 33.77 MW
944591 AF1-124 C Adder 39.87 MW 33.89 MW
944601 AF1-125 C Adder 39.12 MW 33.25 MW
944631 AF1-128 C Adder 36.4 MW 30.94 MW
958261 AF2-120 C Adder 5.26 MW 4.47 MW
962271 AG1-075 C Adder 15.0 MW 12.75 MW
965281 AG1-393 C Adder 1.93 MW 1.64 MW
965691 AG1-437 C Adder 8.43 MW 7.17 MW
965701 AG1-438 C Adder 8.43 MW 7.17 MW
965741 AG1-442 C Adder 4.92 MW 4.18 MW
965751 AG1-443 C Adder 4.92 MW 4.18 MW
965811 AG1-449 C Adder 17.8 MW 15.13 MW
934501 AD1-074 C Adder 28.23 MW 24.0 MW
934511 AD1-075 C Adder 7.06 MW 6.0 MW
935161 AD1-151 C Adder 14.54 MW 12.36 MW
938531 AE1-072 C Adder 15.28 MW 12.99 MW
939191 AE1-149 C Adder 9.49 MW 8.06 MW
939261 AE1-157 C 80/20 13.22 MW 13.22 MW
940431 AE2-027 C Adder 11.62 MW 9.88 MW
940481 AE2-033 C Adder 13.13 MW 11.16 MW
940541 AE2-040 C Adder 2.33 MW 1.98 MW
940551 AE2-041 C Adder 6.28 MW 5.34 MW
940641 AE2-051 C Adder 13.71 MW 11.65 MW
941101 AE2-104 C Adder 2.92 MW 2.48 MW
941281 AE2-122 C Adder 24.89 MW 21.15 MW
942191 AE2-231 C 80/20 4.51 MW 4.51 MW
943471 AF1-018 C Adder 6.28 MW 5.34 MW
944641 AF1-129 C Adder 92.63 MW 78.74 MW
963622 AG1-213 E 80/20 0.68 MW 0.68 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 45.3 MW 45.3 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 25.77 MW 25.77 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 81.3 MW 81.3 MW
NY PJM->LTFIMP_NY CLTF 2.85 MW 2.85 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.8 MW 1.8 MW
WEC LTFEXP_WEC->PJM CLTF 0.93 MW 0.93 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.09 MW 9.09 MW
TVA LTFEXP_TVA->PJM CLTF 6.53 MW 6.53 MW
MEC LTFEXP_MEC->PJM CLTF 5.11 MW 5.11 MW
LAGN LTFEXP_LAGN->PJM CLTF 8.14 MW 8.14 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.33 MW 0.33 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.34 MW 4.34 MW

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 108.51 4070.2 B 4416.63 70.09
Elimination
Base Case Details for Eliminated Flowgate 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.24 MW 1.05 MW
961941 AG1-037 C Adder 0.7 MW 0.6 MW
962331 AG1-082 C Adder 2.82 MW 2.39 MW
962341 AG1-083 C Adder 2.82 MW 2.39 MW
963041 AG1-153 C Adder 7.12 MW 6.05 MW
964801 AG1-343 C Adder 8.37 MW 7.12 MW
966801 AG1-551 C Adder 2.89 MW 2.45 MW
966811 AG1-552 C Adder 2.72 MW 2.32 MW
965291 AG1-394 C Adder 1.2 MW 1.02 MW
966621 AG1-532 C Adder 1.83 MW 1.56 MW
934521 AD1-076 C Adder 17.6 MW 14.96 MW
942931 AE2-313 C Adder 45.85 MW 38.97 MW
944011 AF1-069 C Adder 16.62 MW 14.12 MW
960081 AF2-299 C Adder 2.65 MW 2.25 MW
941031 AE2-094 C Adder 50.85 MW 43.23 MW
946281 AF1-292 C Adder 2.02 MW 1.72 MW
957481 AF2-042 C Adder 66.29 MW 56.34 MW
957521 AF2-046 C Adder 22.05 MW 18.74 MW
957861 AF2-080 C Adder 10.22 MW 8.69 MW
938771 AE1-103 C Adder 4.29 MW 3.64 MW
314229 6MT RD221 80/20 0.17 MW 0.17 MW
314421 6WINCHST 80/20 0.19 MW 0.19 MW
314507 3THOMPSN 80/20 3.1 MW 3.1 MW
315060 1CHESTF5 80/20 96.11 MW 96.11 MW
315061 1CHESTG7 80/20 5.44 MW 5.44 MW
315062 1CHESTS7 80/20 2.5 MW 2.5 MW
315063 1CHESTG8 80/20 5.35 MW 5.35 MW
315064 1CHESTS8 80/20 2.75 MW 2.75 MW
315065 1CHESTF6 Adder 28.15 MW 23.93 MW
315073 1STONECA Adder 10.27 MW 8.73 MW
315083 1SPRUNCA Adder 10.88 MW 9.25 MW
315084 1SPRUNCB Adder 10.88 MW 9.25 MW
315092 1YORKTN3 80/20 224.74 MW 224.74 MW
936591 AD2-074 C Adder 7.76 MW 6.6 MW
942341 AE2-247 C Adder 2.23 MW 1.89 MW
943461 AF1-017 C Adder 2.02 MW 1.71 MW
943741 AF1-042 C Adder 4.06 MW 3.45 MW
944871 AF1-152 C Adder 7.95 MW 6.75 MW
961951 AG1-038 C Adder 4.49 MW 3.81 MW
966661 AG1-536 C Adder 7.32 MW 6.22 MW
966871 AG1-558 C Adder 3.44 MW 2.92 MW
315098 1CHESPKA 80/20 0.62 MW 0.62 MW
315099 1CHESPKB 80/20 1.03 MW 1.03 MW
315108 1ELIZAR1 80/20 4.56 MW 4.56 MW
315109 1ELIZAR2 80/20 4.48 MW 4.48 MW
315110 1ELIZAR3 80/20 4.62 MW 4.62 MW
315116 1SURRY 1 80/20 35.03 MW 35.03 MW
315120 1GRAVEL4 80/20 3.6 MW 3.6 MW
315233 1SURRY 2 80/20 37.54 MW 37.54 MW
315260 1GOSPORTA 80/20 3.27 MW 3.27 MW
315261 1GOSPORTB 80/20 4.18 MW 4.18 MW
315262 1GOSPORTC 80/20 3.55 MW 3.55 MW
316075 AC2-137 C 80/20 0.56 MW 0.56 MW
957601 AF2-054 C Adder 3.17 MW 2.69 MW
962861 AG1-135 C Adder 8.31 MW 7.06 MW
962971 AG1-146 C Adder 4.36 MW 3.71 MW
962981 AG1-147 C Adder 10.18 MW 8.66 MW
963611 AG1-210 C Adder 0.86 MW 0.73 MW
964211 AG1-282 C Adder 2.67 MW 2.27 MW
941501 AE2-147 C Adder 23.84 MW 20.26 MW
942001 AE2-212 C Adder 3.08 MW 2.62 MW
957831 AF2-077 C 80/20 0.47 MW 0.47 MW
957871 AF2-081 C Adder 15.22 MW 12.94 MW
958161 AF2-110 C Adder 2.06 MW 1.75 MW
926071 AC1-086 C Adder 28.04 MW 23.83 MW
927021 AC1-189 C Adder 11.25 MW 9.56 MW
933291 AC2-141 C 80/20 47.56 MW 47.56 MW
939411 AE1-173 C Adder 125.95 MW 107.05 MW
934011 AD1-025 C Adder 25.52 MW 21.69 MW
916191 Z1-068 C 80/20 0.06 MW 0.06 MW
927041 AC1-191 C Adder 13.8 MW 11.73 MW
933981 AD1-022 C Adder 12.53 MW 10.65 MW
961681 AG1-008 C Adder 22.05 MW 18.74 MW
962571 AG1-106 C Adder 3.97 MW 3.37 MW
316004 AC1-112 C 80/20 0.49 MW 0.49 MW
316036 AC1-147 C 80/20 0.53 MW 0.53 MW
316159 AE1-175 C 80/20 0.59 MW 0.59 MW
316169 AC1-164 GEN 80/20 10.13 MW 10.13 MW
316185 AD1-033 C 80/20 1.75 MW 1.75 MW
316210 AC1-098 C Adder 8.2 MW 6.97 MW
316212 AC1-099 C Adder 2.75 MW 2.34 MW
316236 AE1-162 C 80/20 0.5 MW 0.5 MW
316240 AF1-291 C Adder 3.09 MW 2.63 MW
316274 AC1-208 C Adder 11.96 MW 10.17 MW
316294 AC1-161 C 80/20 7.2 MW 7.2 MW
316301 AE2-228 C Adder 3.09 MW 2.63 MW
316304 AE2-227 C Adder 3.1 MW 2.63 MW
316312 AB1-027 C 80/20 0.78 MW 0.78 MW
316314 AB2-024 C 80/20 0.42 MW 0.42 MW
316316 AC1-027 C 80/20 0.45 MW 0.45 MW
316382 AG1-145 C 80/20 0.53 MW 0.53 MW
963221 AG1-171 C Adder 3.25 MW 2.76 MW
963231 AG1-172 C Adder 3.25 MW 2.76 MW
963241 AG1-173 C Adder 3.25 MW 2.76 MW
316375 AC2-012 C 80/20 1.93 MW 1.93 MW
316311 AC2-079 C Adder 8.57 MW 7.29 MW
316349 AD2-085 C Adder 5.14 MW 4.37 MW
961611 AG1-000B C Adder 24.3 MW 20.66 MW
941591 AE2-156 C 80/20 27.51 MW 27.51 MW
942371 AE2-250 C Adder 13.96 MW 11.86 MW
944581 AF1-123 C 80/20 69.84 MW 69.84 MW
944591 AF1-124 C 80/20 70.09 MW 70.09 MW
944601 AF1-125 C 80/20 68.76 MW 68.76 MW
944631 AF1-128 C 80/20 60.13 MW 60.13 MW
958261 AF2-120 C Adder 8.51 MW 7.24 MW
962271 AG1-075 C Adder 24.09 MW 20.48 MW
965281 AG1-393 C Adder 3.1 MW 2.64 MW
965601 AG1-428 C Adder 5.99 MW 5.09 MW
965691 AG1-437 C Adder 14.42 MW 12.26 MW
965701 AG1-438 C Adder 14.42 MW 12.26 MW
965711 AG1-439 C Adder 31.28 MW 26.58 MW
965741 AG1-442 C Adder 8.41 MW 7.15 MW
965751 AG1-443 C Adder 8.41 MW 7.15 MW
965761 AG1-444 C Adder 16.68 MW 14.18 MW
965811 AG1-449 C Adder 29.69 MW 25.23 MW
313764 3SOCKMAN Adder 0.94 MW 0.8 MW
932631 AC2-084 C Adder 8.77 MW 7.46 MW
934321 AD1-056 C Adder 8.23 MW 7.0 MW
934331 AD1-057 C Adder 4.59 MW 3.9 MW
934501 AD1-074 C Adder 48.47 MW 41.2 MW
934511 AD1-075 C Adder 12.12 MW 10.3 MW
935161 AD1-151 C Adder 24.32 MW 20.67 MW
938531 AE1-072 C Adder 26.74 MW 22.73 MW
939191 AE1-149 C Adder 15.63 MW 13.28 MW
940431 AE2-027 C Adder 18.63 MW 15.84 MW
940481 AE2-033 C Adder 21.67 MW 18.42 MW
940541 AE2-040 C Adder 3.85 MW 3.27 MW
940551 AE2-041 C Adder 10.87 MW 9.24 MW
940641 AE2-051 C Adder 23.26 MW 19.77 MW
941101 AE2-104 C Adder 5.05 MW 4.29 MW
941281 AE2-122 C 80/20 43.61 MW 43.61 MW
943471 AF1-018 C Adder 10.87 MW 9.24 MW
944641 AF1-129 C Adder 146.83 MW 124.81 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 73.63 MW 73.63 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 42.26 MW 42.26 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 134.75 MW 134.75 MW
NY PJM->LTFIMP_NY CLTF 3.64 MW 3.64 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.93 MW 2.93 MW
WEC LTFEXP_WEC->PJM CLTF 1.51 MW 1.51 MW
CPLE LTFEXP_CPLE->PJM CLTF 15.09 MW 15.09 MW
TVA LTFEXP_TVA->PJM CLTF 10.75 MW 10.75 MW
MEC LTFEXP_MEC->PJM CLTF 8.33 MW 8.33 MW
LAGN LTFEXP_LAGN->PJM CLTF 13.4 MW 13.4 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.54 MW 0.54 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.21 MW 7.21 MW

Details for 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 573_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P1-2: LN 573_SRT-A
CONTINGENCY 'DVP_P1-2: LN 573_SRT-A'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Single AC 122.44 3220.44 B 3943.26 34.2
Elimination
Base Case Details for Eliminated Flowgate 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 573_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.73 MW 0.62 MW
961791 AG1-021 C Adder 1.61 MW 1.37 MW
961941 AG1-037 C Adder 0.39 MW 0.33 MW
962331 AG1-082 C Adder 1.57 MW 1.34 MW
962341 AG1-083 C Adder 1.57 MW 1.34 MW
963041 AG1-153 C 80/20 5.4 MW 5.4 MW
963171 AG1-166 C Adder 0.81 MW 0.69 MW
963181 AG1-167 C Adder 0.61 MW 0.52 MW
963191 AG1-168 C Adder 0.61 MW 0.52 MW
963201 AG1-169 C Adder 0.61 MW 0.52 MW
963211 AG1-170 C Adder 0.4 MW 0.34 MW
964111 AG1-272 C 80/20 0.81 MW 0.81 MW
964121 AG1-273 C 80/20 0.81 MW 0.81 MW
964131 AG1-274 C 80/20 0.81 MW 0.81 MW
964791 AG1-342 C Adder 2.89 MW 2.46 MW
964801 AG1-343 C Adder 4.65 MW 3.95 MW
966801 AG1-551 C Adder 1.63 MW 1.39 MW
966811 AG1-552 C 80/20 1.65 MW 1.65 MW
965191 AG1-384 C 80/20 0.81 MW 0.81 MW
965291 AG1-394 C Adder 0.66 MW 0.56 MW
965591 AG1-427 C 80/20 9.74 MW 9.74 MW
966621 AG1-532 C 80/20 1.14 MW 1.14 MW
313506 AB1-173 C OP 80/20 0.85 MW 0.85 MW
313853 3PONTONDP Adder 0.54 MW 0.46 MW
314704 3LAWRENC 80/20 0.23 MW 0.23 MW
315126 1ROARAP2 80/20 1.03 MW 1.03 MW
315128 1ROARAP4 80/20 0.97 MW 0.97 MW
315131 1EDGECMA Adder 12.18 MW 10.35 MW
315139 1GASTONA 80/20 2.27 MW 2.27 MW
315153 1CLOVER1 80/20 10.63 MW 10.63 MW
315154 1CLOVER2 80/20 10.53 MW 10.53 MW
315158 1KERR 1 80/20 0.31 MW 0.31 MW
315159 1KERR 2 80/20 0.87 MW 0.87 MW
315160 1KERR 3 80/20 0.87 MW 0.87 MW
315161 1KERR 4 80/20 0.87 MW 0.87 MW
315162 1KERR 5 80/20 0.87 MW 0.87 MW
934521 AD1-076 C Adder 9.37 MW 7.96 MW
942931 AE2-313 C 80/20 35.08 MW 35.08 MW
944011 AF1-069 C 80/20 12.73 MW 12.73 MW
958801 AF2-171 C 80/20 12.11 MW 12.11 MW
959311 AF2-222 C 80/20 13.57 MW 13.57 MW
960061 AF2-297 C Adder 6.31 MW 5.36 MW
960081 AF2-299 C 80/20 1.65 MW 1.65 MW
315163 1KERR 6 80/20 0.87 MW 0.87 MW
315164 1KERR 7 80/20 0.87 MW 0.87 MW
316129 AC1-054 C 80/20 0.92 MW 0.92 MW
316131 AB2-060 C 80/20 1.13 MW 1.13 MW
938371 AE1-056 C Adder 5.2 MW 4.42 MW
939181 AE1-148 C 80/20 7.42 MW 7.42 MW
941031 AE2-094 C 80/20 38.95 MW 38.95 MW
946281 AF1-292 C 80/20 1.26 MW 1.26 MW
946301 AF1-294 C Adder 3.31 MW 2.81 MW
957481 AF2-042 C 80/20 49.78 MW 49.78 MW
957521 AF2-046 C Adder 12.27 MW 10.43 MW
957861 AF2-080 C Adder 5.96 MW 5.07 MW
958211 AF2-115 C Adder 2.02 MW 1.72 MW
938771 AE1-103 C Adder 2.22 MW 1.89 MW
314507 3THOMPSN Adder 1.49 MW 1.26 MW
315083 1SPRUNCA Adder 6.04 MW 5.14 MW
315084 1SPRUNCB Adder 6.04 MW 5.14 MW
942341 AE2-247 C Adder 1.1 MW 0.93 MW
943461 AF1-017 C Adder 0.99 MW 0.84 MW
944871 AF1-152 C Adder 3.96 MW 3.36 MW
315102 1BRUNSWICKG1 80/20 7.38 MW 7.38 MW
315103 1BRUNSWICKG2 80/20 7.38 MW 7.38 MW
315104 1BRUNSWICKG3 80/20 7.38 MW 7.38 MW
315105 1BRUNSWICKS1 80/20 15.35 MW 15.35 MW
315141 1GASTONB 80/20 2.27 MW 2.27 MW
315172 1LOISA A 80/20 2.86 MW 2.86 MW
315173 1LOISA B 80/20 2.88 MW 2.88 MW
315174 1LOISA C 80/20 2.88 MW 2.88 MW
315175 1LOISA D 80/20 2.88 MW 2.88 MW
315176 1LOISA E 80/20 5.86 MW 5.86 MW
315177 1S ANNAG1 80/20 2.83 MW 2.83 MW
315178 1S ANNAS1 80/20 1.45 MW 1.45 MW
315179 1S ANNAG2 80/20 2.83 MW 2.83 MW
315180 1S ANNAS2 80/20 1.45 MW 1.45 MW
315225 1N ANNA1 80/20 99.52 MW 99.52 MW
315226 1N ANNA2 80/20 99.56 MW 99.56 MW
315241 1Z1-086 GT1 80/20 9.47 MW 9.47 MW
315242 1Z1-086 GT2 80/20 9.47 MW 9.47 MW
315243 1Z1-086 GT3 80/20 9.47 MW 9.47 MW
315244 1Z1-086 ST 80/20 16.48 MW 16.48 MW
315260 1GOSPORTA Adder 1.57 MW 1.33 MW
315261 1GOSPORTB Adder 2.01 MW 1.71 MW
315262 1GOSPORTC Adder 1.7 MW 1.45 MW
966001 AG1-469 C 80/20 1.98 MW 1.98 MW
941501 AE2-147 C Adder 11.87 MW 10.09 MW
942001 AE2-212 C Adder 1.48 MW 1.26 MW
957871 AF2-081 C Adder 7.45 MW 6.33 MW
958161 AF2-110 C Adder 1.02 MW 0.87 MW
926071 AC1-086 C 80/20 16.82 MW 16.82 MW
927021 AC1-189 C Adder 6.56 MW 5.58 MW
936261 AD2-033 C 80/20 10.62 MW 10.62 MW
933291 AC2-141 C Adder 22.46 MW 19.09 MW
934621 AD1-088 C 80/20 10.4 MW 10.4 MW
939411 AE1-173 C 80/20 82.28 MW 82.28 MW
933981 AD1-022 C Adder 6.72 MW 5.72 MW
960331 AF2-324 C Adder 5.48 MW 4.66 MW
961681 AG1-008 C Adder 12.27 MW 10.43 MW
962571 AG1-106 C 80/20 2.38 MW 2.38 MW
208900 BRIS G1 80/20 -2.25 MW -2.25 MW
208901 BRIS G2 80/20 -2.66 MW -2.66 MW
316011 AB1-132 C OP 80/20 1.73 MW 1.73 MW
316023 AB2-100 C2 80/20 0.73 MW 0.73 MW
316034 AC1-036 C 80/20 0.18 MW 0.18 MW
316192 AB2-158 C 80/20 3.99 MW 3.99 MW
316210 AC1-098 C Adder 4.83 MW 4.11 MW
316212 AC1-099 C Adder 1.62 MW 1.38 MW
316233 AE1-074 C 80/20 2.16 MW 2.16 MW
316237 AB2-079 C O1 80/20 0.25 MW 0.25 MW
316238 AB2-078 C O1 80/20 0.25 MW 0.25 MW
316239 AB2-077 C O1 80/20 0.25 MW 0.25 MW
316258 AE1-075 C 80/20 0.31 MW 0.31 MW
316263 AC1-034 C Adder 5.21 MW 4.43 MW
316274 AC1-208 C Adder 7.13 MW 6.06 MW
316313 AB2-026 C 80/20 0.33 MW 0.33 MW
316315 AB2-025 C 80/20 0.32 MW 0.32 MW
316336 AC2-165 C 80/20 9.11 MW 9.11 MW
316365 AB2-100 C1 80/20 0.73 MW 0.73 MW
316405 AF2-144 C 80/20 0.26 MW 0.26 MW
316181 AB2-040 GEN 80/20 0.96 MW 0.96 MW
313527 AB2-043 C 80/20 0.39 MW 0.39 MW
316087 AB2-174 C 80/20 0.89 MW 0.89 MW
316311 AC2-079 C Adder 4.23 MW 3.6 MW
316349 AD2-085 C Adder 2.54 MW 2.16 MW
941591 AE2-156 C Adder 13.21 MW 11.23 MW
944581 AF1-123 C 80/20 34.08 MW 34.08 MW
944591 AF1-124 C 80/20 34.2 MW 34.2 MW
944601 AF1-125 C 80/20 33.55 MW 33.55 MW
957431 AF2-037 C 80/20 28.48 MW 28.48 MW
957691 AF2-063 C 80/20 45.45 MW 45.45 MW
962491 AG1-098 C 80/20 9.37 MW 9.37 MW
962561 AG1-105 C Adder 7.26 MW 6.17 MW
964241 AG1-285 C 80/20 10.26 MW 10.26 MW
964421 AG1-305 C 80/20 19.09 MW 19.09 MW
965601 AG1-428 C 80/20 3.92 MW 3.92 MW
965691 AG1-437 C Adder 7.79 MW 6.62 MW
965701 AG1-438 C Adder 7.79 MW 6.62 MW
965711 AG1-439 C Adder 18.39 MW 15.63 MW
965741 AG1-442 C Adder 4.55 MW 3.86 MW
965751 AG1-443 C Adder 4.55 MW 3.86 MW
965761 AG1-444 C Adder 9.81 MW 8.34 MW
965811 AG1-449 C 80/20 22.71 MW 22.71 MW
965831 AG1-451 C Adder 2.66 MW 2.26 MW
313764 3SOCKMAN 80/20 0.57 MW 0.57 MW
932631 AC2-084 C Adder 5.16 MW 4.39 MW
934321 AD1-056 C Adder 4.96 MW 4.21 MW
934331 AD1-057 C Adder 2.76 MW 2.35 MW
934501 AD1-074 C Adder 25.8 MW 21.93 MW
934511 AD1-075 C Adder 6.45 MW 5.48 MW
934611 AD1-087 C 80/20 1.05 MW 1.05 MW
935171 AD1-152 C 80/20 1.08 MW 1.08 MW
937481 AD2-202 C 80/20 0.3 MW 0.3 MW
938531 AE1-072 C Adder 13.1 MW 11.14 MW
939191 AE1-149 C Adder 7.68 MW 6.53 MW
940481 AE2-033 C 80/20 13.56 MW 13.56 MW
940541 AE2-040 C 80/20 2.41 MW 2.41 MW
940641 AE2-051 C 80/20 16.56 MW 16.56 MW
941101 AE2-104 C Adder 2.5 MW 2.12 MW
941281 AE2-122 C Adder 21.09 MW 17.93 MW
942461 AE2-259 C Adder 7.97 MW 6.77 MW
316303 AF2-085 80/20 4.03 MW 4.03 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 21.98 MW 21.98 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 17.56 MW 17.56 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 78.15 MW 78.15 MW
NY PJM->LTFIMP_NY CLTF 2.3 MW 2.3 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.94 MW 0.94 MW
WEC LTFEXP_WEC->PJM CLTF 0.47 MW 0.47 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.34 MW 9.34 MW
TVA LTFEXP_TVA->PJM CLTF 4.87 MW 4.87 MW
MEC LTFEXP_MEC->PJM CLTF 2.96 MW 2.96 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.15 MW 6.15 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.18 MW 0.18 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.45 MW 4.45 MW

Details for 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 102.87 2442.12 B 2512.29 75.3
Elimination
Base Case Details for Eliminated Flowgate 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.05 MW 0.89 MW
961941 AG1-037 C Adder 0.63 MW 0.54 MW
962331 AG1-082 C Adder 2.52 MW 2.14 MW
962341 AG1-083 C Adder 2.52 MW 2.14 MW
963041 AG1-153 C Adder 6.62 MW 5.62 MW
964791 AG1-342 C Adder 3.16 MW 2.69 MW
964801 AG1-343 C Adder 7.45 MW 6.33 MW
966801 AG1-551 C Adder 2.56 MW 2.18 MW
966811 AG1-552 C Adder 2.27 MW 1.93 MW
965291 AG1-394 C Adder 1.07 MW 0.91 MW
965591 AG1-427 C Adder 9.9 MW 8.41 MW
966621 AG1-532 C Adder 1.44 MW 1.22 MW
315131 1EDGECMA Adder 16.74 MW 14.23 MW
934521 AD1-076 C 80/20 16.6 MW 16.6 MW
942931 AE2-313 C 80/20 42.97 MW 42.97 MW
944011 AF1-069 C 80/20 15.66 MW 15.66 MW
960061 AF2-297 C Adder 7.11 MW 6.04 MW
960081 AF2-299 C Adder 2.08 MW 1.77 MW
939181 AE1-148 C Adder 8.34 MW 7.09 MW
940491 AE2-034 C 80/20 1.5 MW 1.5 MW
941031 AE2-094 C 80/20 47.93 MW 47.93 MW
946281 AF1-292 C Adder 1.59 MW 1.35 MW
957481 AF2-042 C Adder 58.36 MW 49.61 MW
957521 AF2-046 C Adder 19.67 MW 16.72 MW
957861 AF2-080 C Adder 8.79 MW 7.47 MW
938771 AE1-103 C 80/20 3.98 MW 3.98 MW
313526 AB2-022 C 80/20 0.54 MW 0.54 MW
314421 6WINCHST 80/20 0.15 MW 0.15 MW
314507 3THOMPSN 80/20 3.17 MW 3.17 MW
315092 1YORKTN3 80/20 178.87 MW 178.87 MW
942341 AE2-247 C 80/20 1.89 MW 1.89 MW
943461 AF1-017 C 80/20 1.71 MW 1.71 MW
944871 AF1-152 C 80/20 7.97 MW 7.97 MW
315098 1CHESPKA 80/20 0.64 MW 0.64 MW
315099 1CHESPKB 80/20 1.05 MW 1.05 MW
315108 1ELIZAR1 80/20 4.7 MW 4.7 MW
315109 1ELIZAR2 80/20 4.62 MW 4.62 MW
315110 1ELIZAR3 80/20 4.76 MW 4.76 MW
315115 1S HAMPT1 80/20 1.82 MW 1.82 MW
315233 1SURRY 2 80/20 47.93 MW 47.93 MW
315241 1Z1-086 GT1 80/20 11.62 MW 11.62 MW
315242 1Z1-086 GT2 80/20 11.62 MW 11.62 MW
315243 1Z1-086 GT3 80/20 11.62 MW 11.62 MW
315244 1Z1-086 ST 80/20 20.23 MW 20.23 MW
315260 1GOSPORTA 80/20 3.35 MW 3.35 MW
315261 1GOSPORTB 80/20 4.28 MW 4.28 MW
315262 1GOSPORTC 80/20 3.63 MW 3.63 MW
315605 6W1-029WIND 80/20 1.09 MW 1.09 MW
315611 6Z1-036WIND 80/20 0.9 MW 0.9 MW
941501 AE2-147 C 80/20 23.9 MW 23.9 MW
957871 AF2-081 C 80/20 15.78 MW 15.78 MW
958161 AF2-110 C 80/20 1.97 MW 1.97 MW
926071 AC1-086 C Adder 22.95 MW 19.51 MW
927021 AC1-189 C Adder 9.68 MW 8.23 MW
936261 AD2-033 C Adder 10.12 MW 8.6 MW
933291 AC2-141 C 80/20 56.39 MW 56.39 MW
934621 AD1-088 C Adder 9.5 MW 8.08 MW
939411 AE1-173 C 80/20 127.84 MW 127.84 MW
934011 AD1-025 C Adder 13.61 MW 11.57 MW
916191 Z1-068 C 80/20 0.07 MW 0.07 MW
933981 AD1-022 C 80/20 11.71 MW 11.71 MW
960331 AF2-324 C Adder 7.53 MW 6.4 MW
961681 AG1-008 C Adder 19.67 MW 16.72 MW
962571 AG1-106 C Adder 3.25 MW 2.76 MW
316036 AC1-147 C 80/20 0.54 MW 0.54 MW
316072 AD1-144 C 80/20 0.38 MW 0.38 MW
316185 AD1-033 C 80/20 1.82 MW 1.82 MW
316210 AC1-098 C Adder 6.99 MW 5.94 MW
316212 AC1-099 C Adder 2.34 MW 1.99 MW
316236 AE1-162 C 80/20 0.42 MW 0.42 MW
316246 AF1-032 C 80/20 0.4 MW 0.4 MW
316263 AC1-034 C Adder 7.16 MW 6.08 MW
316274 AC1-208 C Adder 10.07 MW 8.56 MW
316294 AC1-161 C 80/20 8.54 MW 8.54 MW
316305 AF2-043 C 80/20 0.49 MW 0.49 MW
316316 AC1-027 C 80/20 0.46 MW 0.46 MW
316320 Y1-086 C 80/20 0.32 MW 0.32 MW
316321 Z2-027 C 80/20 0.52 MW 0.52 MW
963221 AG1-171 C Adder 1.73 MW 1.47 MW
963231 AG1-172 C Adder 1.73 MW 1.47 MW
963241 AG1-173 C Adder 1.73 MW 1.47 MW
316017 AA1-139 ULT1 80/20 1.58 MW 1.58 MW
316018 AA1-139 ULT2 80/20 1.58 MW 1.58 MW
315614 AA2-178 C 80/20 2.04 MW 2.04 MW
316375 AC2-012 C 80/20 1.98 MW 1.98 MW
316311 AC2-079 C 80/20 7.38 MW 7.38 MW
316349 AD2-085 C 80/20 4.35 MW 4.35 MW
316388 AE2-253 GEN 80/20 2.89 MW 2.89 MW
961611 AG1-000B C Adder 16.42 MW 13.96 MW
941591 AE2-156 C 80/20 28.25 MW 28.25 MW
944581 AF1-123 C 80/20 75.04 MW 75.04 MW
944591 AF1-124 C 80/20 75.3 MW 75.3 MW
944601 AF1-125 C 80/20 73.88 MW 73.88 MW
962491 AG1-098 C Adder 8.6 MW 7.31 MW
962561 AG1-105 C Adder 7.9 MW 6.71 MW
964241 AG1-285 C Adder 10.35 MW 8.8 MW
965601 AG1-428 C Adder 4.64 MW 3.94 MW
965691 AG1-437 C 80/20 13.38 MW 13.38 MW
965701 AG1-438 C 80/20 13.38 MW 13.38 MW
965711 AG1-439 C Adder 26.68 MW 22.68 MW
965741 AG1-442 C 80/20 7.8 MW 7.8 MW
965751 AG1-443 C 80/20 7.8 MW 7.8 MW
965761 AG1-444 C Adder 14.23 MW 12.1 MW
965811 AG1-449 C 80/20 27.82 MW 27.82 MW
313764 3SOCKMAN Adder 0.77 MW 0.66 MW
932631 AC2-084 C Adder 7.48 MW 6.35 MW
934321 AD1-056 C Adder 6.78 MW 5.77 MW
934331 AD1-057 C Adder 3.78 MW 3.22 MW
934501 AD1-074 C 80/20 45.72 MW 45.72 MW
934511 AD1-075 C 80/20 11.43 MW 11.43 MW
935161 AD1-151 C Adder 11.74 MW 9.98 MW
938531 AE1-072 C 80/20 27.64 MW 27.64 MW
939191 AE1-149 C Adder 8.69 MW 7.39 MW
940481 AE2-033 C Adder 16.01 MW 13.61 MW
940541 AE2-040 C Adder 2.82 MW 2.4 MW
940641 AE2-051 C 80/20 23.28 MW 23.28 MW
941101 AE2-104 C 80/20 4.83 MW 4.83 MW
941281 AE2-122 C 80/20 45.18 MW 45.18 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 27.26 MW 27.26 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 20.76 MW 20.76 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 95.08 MW 95.08 MW
NY PJM->LTFIMP_NY CLTF 1.58 MW 1.58 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.09 MW 1.09 MW
WEC LTFEXP_WEC->PJM CLTF 0.57 MW 0.57 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.67 MW 11.67 MW
TVA LTFEXP_TVA->PJM CLTF 5.7 MW 5.7 MW
MEC LTFEXP_MEC->PJM CLTF 3.54 MW 3.54 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.26 MW 7.26 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.22 MW 0.22 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.56 MW 5.56 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Single AC 130.89 3220.44 B 4215.14 69.45
Elimination
Base Case Details for Eliminated Flowgate 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.35 MW 1.15 MW
961791 AG1-021 C Adder 2.58 MW 2.19 MW
961941 AG1-037 C Adder 0.75 MW 0.63 MW
962331 AG1-082 C Adder 2.98 MW 2.54 MW
962341 AG1-083 C Adder 2.98 MW 2.54 MW
963041 AG1-153 C 80/20 8.83 MW 8.83 MW
963171 AG1-166 C Adder 1.29 MW 1.09 MW
963181 AG1-167 C Adder 0.97 MW 0.82 MW
963191 AG1-168 C Adder 0.97 MW 0.82 MW
963201 AG1-169 C Adder 0.97 MW 0.82 MW
963211 AG1-170 C Adder 0.64 MW 0.55 MW
964111 AG1-272 C Adder 1.33 MW 1.13 MW
964121 AG1-273 C Adder 1.33 MW 1.13 MW
964131 AG1-274 C Adder 1.33 MW 1.13 MW
964791 AG1-342 C Adder 4.86 MW 4.13 MW
964801 AG1-343 C Adder 8.86 MW 7.53 MW
966801 AG1-551 C Adder 3.07 MW 2.61 MW
966811 AG1-552 C Adder 3.0 MW 2.55 MW
965191 AG1-384 C Adder 1.33 MW 1.13 MW
965291 AG1-394 C Adder 1.27 MW 1.08 MW
965591 AG1-427 C Adder 16.15 MW 13.73 MW
966621 AG1-532 C Adder 2.06 MW 1.75 MW
313853 3PONTONDP Adder 0.86 MW 0.73 MW
315131 1EDGECMA Adder 22.21 MW 18.88 MW
934521 AD1-076 C Adder 18.21 MW 15.48 MW
942931 AE2-313 C 80/20 57.18 MW 57.18 MW
944011 AF1-069 C 80/20 20.74 MW 20.74 MW
958801 AF2-171 C Adder 19.34 MW 16.44 MW
959311 AF2-222 C Adder 22.05 MW 18.74 MW
960061 AF2-297 C Adder 10.65 MW 9.05 MW
960081 AF2-299 C Adder 2.98 MW 2.53 MW
938371 AE1-056 C Adder 8.24 MW 7.0 MW
939181 AE1-148 C Adder 12.55 MW 10.66 MW
941031 AE2-094 C 80/20 63.47 MW 63.47 MW
946281 AF1-292 C Adder 2.27 MW 1.93 MW
946301 AF1-294 C Adder 5.28 MW 4.49 MW
957481 AF2-042 C 80/20 81.62 MW 81.62 MW
957521 AF2-046 C Adder 23.34 MW 19.84 MW
957861 AF2-080 C Adder 11.05 MW 9.39 MW
958211 AF2-115 C Adder 3.22 MW 2.74 MW
938771 AE1-103 C Adder 4.39 MW 3.73 MW
313526 AB2-022 C 80/20 0.53 MW 0.53 MW
314507 3THOMPSN 80/20 3.06 MW 3.06 MW
315060 1CHESTF5 Adder 82.96 MW 70.52 MW
315065 1CHESTF6 Adder 27.69 MW 23.54 MW
315073 1STONECA Adder 9.58 MW 8.14 MW
315083 1SPRUNCA 80/20 13.15 MW 13.15 MW
315084 1SPRUNCB Adder 13.15 MW 11.18 MW
315092 1YORKTN3 Adder 195.79 MW 166.42 MW
942341 AE2-247 C 80/20 2.24 MW 2.24 MW
943461 AF1-017 C 80/20 2.03 MW 2.03 MW
944871 AF1-152 C 80/20 7.96 MW 7.96 MW
315098 1CHESPKA 80/20 0.61 MW 0.61 MW
315099 1CHESPKB 80/20 1.01 MW 1.01 MW
315102 1BRUNSWICKG1 80/20 12.09 MW 12.09 MW
315103 1BRUNSWICKG2 80/20 12.09 MW 12.09 MW
315104 1BRUNSWICKG3 80/20 12.09 MW 12.09 MW
315105 1BRUNSWICKS1 80/20 25.11 MW 25.11 MW
315108 1ELIZAR1 80/20 4.5 MW 4.5 MW
315109 1ELIZAR2 80/20 4.42 MW 4.42 MW
315110 1ELIZAR3 80/20 4.56 MW 4.56 MW
315241 1Z1-086 GT1 80/20 15.48 MW 15.48 MW
315242 1Z1-086 GT2 80/20 15.47 MW 15.47 MW
315243 1Z1-086 GT3 80/20 15.47 MW 15.47 MW
315244 1Z1-086 ST 80/20 26.94 MW 26.94 MW
315260 1GOSPORTA 80/20 3.23 MW 3.23 MW
315261 1GOSPORTB 80/20 4.12 MW 4.12 MW
315262 1GOSPORTC 80/20 3.5 MW 3.5 MW
315605 6W1-029WIND 80/20 1.09 MW 1.09 MW
957601 AF2-054 C Adder 2.53 MW 2.15 MW
941501 AE2-147 C 80/20 23.89 MW 23.89 MW
942001 AE2-212 C Adder 3.16 MW 2.68 MW
957871 AF2-081 C 80/20 15.12 MW 15.12 MW
958161 AF2-110 C 80/20 2.06 MW 2.06 MW
926071 AC1-086 C Adder 30.87 MW 26.24 MW
927021 AC1-189 C Adder 12.17 MW 10.34 MW
936261 AD2-033 C Adder 17.39 MW 14.78 MW
933291 AC2-141 C 80/20 46.26 MW 46.26 MW
934621 AD1-088 C Adder 16.58 MW 14.1 MW
939411 AE1-173 C 80/20 144.05 MW 144.05 MW
934011 AD1-025 C Adder 23.99 MW 20.39 MW
916191 Z1-068 C 80/20 0.06 MW 0.06 MW
315085 1SPRUNCC 80/20 0.22 MW 0.22 MW
315086 1SPRUNCD 80/20 0.22 MW 0.22 MW
933981 AD1-022 C Adder 13.02 MW 11.06 MW
960331 AF2-324 C Adder 10.0 MW 8.5 MW
961681 AG1-008 C Adder 23.34 MW 19.84 MW
962571 AG1-106 C Adder 4.37 MW 3.71 MW
316036 AC1-147 C 80/20 0.52 MW 0.52 MW
316072 AD1-144 C 80/20 0.39 MW 0.39 MW
316185 AD1-033 C 80/20 1.73 MW 1.73 MW
316210 AC1-098 C Adder 8.92 MW 7.58 MW
316212 AC1-099 C Adder 2.99 MW 2.54 MW
316233 AE1-074 C 80/20 3.91 MW 3.91 MW
316236 AE1-162 C 80/20 0.48 MW 0.48 MW
316240 AF1-291 C Adder 3.07 MW 2.61 MW
316246 AF1-032 C 80/20 0.4 MW 0.4 MW
316263 AC1-034 C Adder 9.5 MW 8.07 MW
316274 AC1-208 C Adder 13.09 MW 11.13 MW
316294 AC1-161 C 80/20 7.0 MW 7.0 MW
316301 AE2-228 C Adder 3.08 MW 2.62 MW
316304 AE2-227 C Adder 2.88 MW 2.45 MW
316305 AF2-043 C 80/20 0.49 MW 0.49 MW
316315 AB2-025 C 80/20 0.57 MW 0.57 MW
316316 AC1-027 C 80/20 0.44 MW 0.44 MW
316320 Y1-086 C 80/20 0.31 MW 0.31 MW
316321 Z2-027 C 80/20 0.51 MW 0.51 MW
316336 AC2-165 C Adder 13.9 MW 11.82 MW
963221 AG1-171 C Adder 3.06 MW 2.6 MW
963231 AG1-172 C Adder 3.06 MW 2.6 MW
963241 AG1-173 C Adder 3.06 MW 2.6 MW
316017 AA1-139 ULT1 80/20 1.52 MW 1.52 MW
316018 AA1-139 ULT2 80/20 1.52 MW 1.52 MW
316083 AB2-161 C 80/20 0.77 MW 0.77 MW
316375 AC2-012 C 80/20 1.9 MW 1.9 MW
316311 AC2-079 C 80/20 8.63 MW 8.63 MW
316381 AD1-082 C 80/20 1.75 MW 1.75 MW
316349 AD2-085 C 80/20 5.17 MW 5.17 MW
316388 AE2-253 GEN 80/20 2.76 MW 2.76 MW
961611 AG1-000B C Adder 22.95 MW 19.5 MW
941591 AE2-156 C 80/20 27.12 MW 27.12 MW
942371 AE2-250 C Adder 13.92 MW 11.84 MW
944581 AF1-123 C 80/20 69.2 MW 69.2 MW
944591 AF1-124 C 80/20 69.45 MW 69.45 MW
944601 AF1-125 C 80/20 68.14 MW 68.14 MW
944631 AF1-128 C Adder 51.91 MW 44.12 MW
962271 AG1-075 C Adder 24.03 MW 20.43 MW
962491 AG1-098 C Adder 14.94 MW 12.7 MW
962561 AG1-105 C Adder 12.18 MW 10.36 MW
964241 AG1-285 C Adder 16.99 MW 14.44 MW
965281 AG1-393 C Adder 3.09 MW 2.63 MW
965601 AG1-428 C Adder 6.87 MW 5.84 MW
965691 AG1-437 C Adder 15.03 MW 12.78 MW
965701 AG1-438 C Adder 15.03 MW 12.78 MW
965711 AG1-439 C Adder 33.96 MW 28.87 MW
965741 AG1-442 C Adder 8.77 MW 7.45 MW
965751 AG1-443 C Adder 8.77 MW 7.45 MW
965761 AG1-444 C Adder 18.11 MW 15.4 MW
965811 AG1-449 C 80/20 37.03 MW 37.03 MW
965831 AG1-451 C Adder 4.12 MW 3.5 MW
313764 3SOCKMAN Adder 1.04 MW 0.89 MW
932631 AC2-084 C Adder 9.54 MW 8.11 MW
934321 AD1-056 C Adder 9.06 MW 7.7 MW
934331 AD1-057 C Adder 5.06 MW 4.3 MW
934501 AD1-074 C Adder 50.15 MW 42.62 MW
934511 AD1-075 C Adder 12.54 MW 10.66 MW
935161 AD1-151 C Adder 22.83 MW 19.4 MW
938531 AE1-072 C 80/20 26.58 MW 26.58 MW
939191 AE1-149 C 80/20 15.97 MW 15.97 MW
940431 AE2-027 C Adder 18.41 MW 15.65 MW
940481 AE2-033 C 80/20 24.55 MW 24.55 MW
940541 AE2-040 C 80/20 4.37 MW 4.37 MW
940551 AE2-041 C Adder 8.48 MW 7.21 MW
940641 AE2-051 C 80/20 27.86 MW 27.86 MW
941101 AE2-104 C 80/20 5.06 MW 5.06 MW
941281 AE2-122 C 80/20 43.11 MW 43.11 MW
942461 AE2-259 C Adder 12.36 MW 10.5 MW
943471 AF1-018 C Adder 8.48 MW 7.21 MW
944641 AF1-129 C Adder 144.42 MW 122.76 MW
316303 AF2-085 80/20 6.47 MW 6.47 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 64.83 MW 64.83 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 40.17 MW 40.17 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 144.81 MW 144.81 MW
NY PJM->LTFIMP_NY CLTF 3.2 MW 3.2 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.58 MW 2.58 MW
WEC LTFEXP_WEC->PJM CLTF 1.33 MW 1.33 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.76 MW 16.76 MW
TVA LTFEXP_TVA->PJM CLTF 10.46 MW 10.46 MW
MEC LTFEXP_MEC->PJM CLTF 7.6 MW 7.6 MW
LAGN LTFEXP_LAGN->PJM CLTF 13.13 MW 13.13 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.49 MW 0.49 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.0 MW 8.0 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Single AC 113.49 3220.44 B 3654.86 62.69
Elimination
Base Case Details for Eliminated Flowgate 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.26 MW 1.07 MW
961941 AG1-037 C Adder 0.68 MW 0.57 MW
962331 AG1-082 C Adder 2.7 MW 2.3 MW
962341 AG1-083 C Adder 2.7 MW 2.3 MW
963041 AG1-153 C 80/20 9.27 MW 9.27 MW
964111 AG1-272 C Adder 1.03 MW 0.88 MW
964121 AG1-273 C Adder 1.03 MW 0.88 MW
964131 AG1-274 C Adder 1.03 MW 0.88 MW
964791 AG1-342 C Adder 4.38 MW 3.72 MW
964801 AG1-343 C Adder 7.95 MW 6.76 MW
966801 AG1-551 C Adder 2.82 MW 2.4 MW
966811 AG1-552 C Adder 2.73 MW 2.32 MW
965191 AG1-384 C Adder 1.03 MW 0.88 MW
965291 AG1-394 C Adder 1.14 MW 0.97 MW
965591 AG1-427 C Adder 13.42 MW 11.41 MW
966621 AG1-532 C Adder 1.86 MW 1.58 MW
315131 1EDGECMA Adder 20.71 MW 17.6 MW
315153 1CLOVER1 80/20 17.16 MW 17.16 MW
315154 1CLOVER2 80/20 17.0 MW 17.0 MW
934521 AD1-076 C Adder 16.48 MW 14.01 MW
942931 AE2-313 C 80/20 60.23 MW 60.23 MW
944011 AF1-069 C 80/20 21.96 MW 21.96 MW
959311 AF2-222 C Adder 16.87 MW 14.34 MW
960061 AF2-297 C Adder 9.96 MW 8.46 MW
960081 AF2-299 C Adder 2.69 MW 2.28 MW
939181 AE1-148 C Adder 11.17 MW 9.49 MW
940491 AE2-034 C 80/20 1.44 MW 1.44 MW
941031 AE2-094 C 80/20 67.21 MW 67.21 MW
946281 AF1-292 C Adder 2.05 MW 1.74 MW
957481 AF2-042 C 80/20 81.53 MW 81.53 MW
957521 AF2-046 C Adder 21.05 MW 17.89 MW
957861 AF2-080 C Adder 10.23 MW 8.7 MW
938771 AE1-103 C 80/20 3.89 MW 3.89 MW
313526 AB2-022 C 80/20 0.47 MW 0.47 MW
314507 3THOMPSN 80/20 2.71 MW 2.71 MW
315092 1YORKTN3 Adder 152.71 MW 129.8 MW
942341 AE2-247 C Adder 1.9 MW 1.61 MW
943461 AF1-017 C Adder 1.72 MW 1.46 MW
944871 AF1-152 C 80/20 7.13 MW 7.13 MW
315098 1CHESPKA 80/20 0.54 MW 0.54 MW
315099 1CHESPKB 80/20 0.9 MW 0.9 MW
315102 1BRUNSWICKG1 80/20 12.68 MW 12.68 MW
315103 1BRUNSWICKG2 80/20 12.68 MW 12.68 MW
315104 1BRUNSWICKG3 80/20 12.68 MW 12.68 MW
315105 1BRUNSWICKS1 80/20 26.35 MW 26.35 MW
315108 1ELIZAR1 80/20 3.99 MW 3.99 MW
315109 1ELIZAR2 80/20 3.92 MW 3.92 MW
315110 1ELIZAR3 80/20 4.05 MW 4.05 MW
315241 1Z1-086 GT1 80/20 16.29 MW 16.29 MW
315242 1Z1-086 GT2 80/20 16.28 MW 16.28 MW
315243 1Z1-086 GT3 80/20 16.28 MW 16.28 MW
315244 1Z1-086 ST 80/20 28.35 MW 28.35 MW
315260 1GOSPORTA 80/20 2.86 MW 2.86 MW
315261 1GOSPORTB 80/20 3.65 MW 3.65 MW
315262 1GOSPORTC 80/20 3.1 MW 3.1 MW
315605 6W1-029WIND 80/20 0.97 MW 0.97 MW
315611 6Z1-036WIND 80/20 0.82 MW 0.82 MW
941501 AE2-147 C 80/20 21.39 MW 21.39 MW
942001 AE2-212 C Adder 2.14 MW 1.82 MW
957871 AF2-081 C 80/20 13.54 MW 13.54 MW
958161 AF2-110 C 80/20 1.81 MW 1.81 MW
926071 AC1-086 C Adder 28.19 MW 23.96 MW
927021 AC1-189 C Adder 11.26 MW 9.57 MW
936261 AD2-033 C Adder 13.75 MW 11.69 MW
933291 AC2-141 C 80/20 42.23 MW 42.23 MW
934621 AD1-088 C Adder 13.16 MW 11.19 MW
939411 AE1-173 C 80/20 145.4 MW 145.4 MW
934011 AD1-025 C Adder 16.73 MW 14.22 MW
916191 Z1-068 C 80/20 0.06 MW 0.06 MW
933981 AD1-022 C Adder 11.79 MW 10.02 MW
960331 AF2-324 C Adder 9.32 MW 7.92 MW
961681 AG1-008 C Adder 21.05 MW 17.89 MW
962571 AG1-106 C Adder 3.99 MW 3.39 MW
316023 AB2-100 C2 80/20 1.21 MW 1.21 MW
316036 AC1-147 C 80/20 0.46 MW 0.46 MW
316185 AD1-033 C 80/20 1.55 MW 1.55 MW
316210 AC1-098 C Adder 8.18 MW 6.95 MW
316212 AC1-099 C Adder 2.74 MW 2.33 MW
316246 AF1-032 C 80/20 0.35 MW 0.35 MW
316263 AC1-034 C Adder 8.85 MW 7.52 MW
316274 AC1-208 C Adder 12.01 MW 10.21 MW
316294 AC1-161 C 80/20 6.4 MW 6.4 MW
316305 AF2-043 C 80/20 0.43 MW 0.43 MW
316315 AB2-025 C 80/20 0.52 MW 0.52 MW
316316 AC1-027 C 80/20 0.4 MW 0.4 MW
316320 Y1-086 C 80/20 0.28 MW 0.28 MW
316321 Z2-027 C 80/20 0.46 MW 0.46 MW
316365 AB2-100 C1 80/20 1.21 MW 1.21 MW
963221 AG1-171 C Adder 2.13 MW 1.81 MW
963231 AG1-172 C Adder 2.13 MW 1.81 MW
963241 AG1-173 C Adder 2.13 MW 1.81 MW
316017 AA1-139 ULT1 80/20 1.36 MW 1.36 MW
316018 AA1-139 ULT2 80/20 1.36 MW 1.36 MW
315614 AA2-178 C 80/20 1.96 MW 1.96 MW
316375 AC2-012 C 80/20 1.69 MW 1.69 MW
316311 AC2-079 C Adder 7.33 MW 6.23 MW
316349 AD2-085 C Adder 4.38 MW 3.72 MW
316388 AE2-253 GEN 80/20 2.47 MW 2.47 MW
961611 AG1-000B C Adder 17.26 MW 14.67 MW
941591 AE2-156 C 80/20 24.04 MW 24.04 MW
942371 AE2-250 C Adder 9.02 MW 7.66 MW
944581 AF1-123 C 80/20 62.47 MW 62.47 MW
944591 AF1-124 C 80/20 62.69 MW 62.69 MW
944601 AF1-125 C 80/20 61.51 MW 61.51 MW
962271 AG1-075 C Adder 15.56 MW 13.22 MW
962491 AG1-098 C Adder 11.91 MW 10.13 MW
962561 AG1-105 C Adder 10.88 MW 9.25 MW
964241 AG1-285 C Adder 14.04 MW 11.94 MW
965281 AG1-393 C Adder 2.0 MW 1.7 MW
965601 AG1-428 C Adder 6.09 MW 5.17 MW
965691 AG1-437 C Adder 13.62 MW 11.58 MW
965701 AG1-438 C Adder 13.62 MW 11.58 MW
965711 AG1-439 C Adder 31.5 MW 26.77 MW
965741 AG1-442 C Adder 7.95 MW 6.75 MW
965751 AG1-443 C Adder 7.95 MW 6.75 MW
965761 AG1-444 C Adder 16.8 MW 14.28 MW
965811 AG1-449 C 80/20 39.0 MW 39.0 MW
313764 3SOCKMAN Adder 0.94 MW 0.8 MW
932631 AC2-084 C Adder 8.74 MW 7.43 MW
934321 AD1-056 C Adder 8.37 MW 7.12 MW
934331 AD1-057 C Adder 4.67 MW 3.97 MW
934501 AD1-074 C Adder 45.38 MW 38.57 MW
934511 AD1-075 C Adder 11.34 MW 9.64 MW
934611 AD1-087 C 80/20 1.69 MW 1.69 MW
935161 AD1-151 C Adder 15.47 MW 13.15 MW
935171 AD1-152 C 80/20 1.74 MW 1.74 MW
937481 AD2-202 C 80/20 0.49 MW 0.49 MW
938531 AE1-072 C 80/20 23.8 MW 23.8 MW
939191 AE1-149 C Adder 12.12 MW 10.3 MW
940481 AE2-033 C 80/20 22.34 MW 22.34 MW
940541 AE2-040 C 80/20 3.97 MW 3.97 MW
940641 AE2-051 C 80/20 29.03 MW 29.03 MW
941101 AE2-104 C 80/20 4.44 MW 4.44 MW
941281 AE2-122 C 80/20 38.42 MW 38.42 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 54.91 MW 54.91 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 35.44 MW 35.44 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 136.4 MW 136.4 MW
NY PJM->LTFIMP_NY CLTF 2.57 MW 2.57 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.17 MW 2.17 MW
WEC LTFEXP_WEC->PJM CLTF 1.13 MW 1.13 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.04 MW 16.04 MW
TVA LTFEXP_TVA->PJM CLTF 9.34 MW 9.34 MW
MEC LTFEXP_MEC->PJM CLTF 6.56 MW 6.56 MW
LAGN LTFEXP_LAGN->PJM CLTF 11.78 MW 11.78 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.41 MW 0.41 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.65 MW 7.65 MW

Details for 8OX-8CLIFTON 500.0 kV Ckt 1 line l/o DVP_P7-1: LN 2101-569_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8OX-8CLIFTON 500.0 kV Ckt 1 line
314919 to 314904 ckt 1
DVP_P7-1: LN 2101-569_SRT-S
CONTINGENCY 'DVP_P7-1: LN 2101-569_SRT-S'
 OPEN BRANCH FROM BUS 313712 TO BUS 313716 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL DP  230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314119 CKT 1                /*6VINTHIL TP  230.0 - 6NOKESVL     230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314125 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL     230.0
 OPEN BRANCH FROM BUS 314119 TO BUS 314130 CKT 1                /*6NOKESVL     230.0 - 6BRISTER     230.0
 OPEN BRANCH FROM BUS 314913 TO BUS 314916 CKT 1                /*8LOUDOUN     500.0 - 8MORRSVL     500.0
 OPEN BUS 313712                                                /*6VINTHIL TP  230.0
 OPEN BUS 313716                                                /*6VINTHIL DP  230.0
 OPEN BUS 314119                                                /*6NOKESVL     230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Tower AC 106.47 3144.0 C 3347.47 97.92
Elimination
Base Case Details for Eliminated Flowgate 8OX-8CLIFTON 500.0 kV Ckt 1 line l/o DVP_P7-1: LN 2101-569_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314331 6POE Adder 0.89 MW 0.76 MW
314507 3THOMPSN Adder 1.32 MW 1.12 MW
315007 1POSSM 5 Adder 102.2 MW 86.87 MW
315008 1POSSM6A 50/50 3.45 MW 3.45 MW
315009 1POSSM6B 50/50 3.45 MW 3.45 MW
315010 1POSSM6S 50/50 5.37 MW 5.37 MW
315033 1BIRCHWDA Adder 33.44 MW 28.43 MW
315039 1LDYSMT3 50/50 3.64 MW 3.64 MW
315040 1LDYSMT4 50/50 3.65 MW 3.65 MW
315041 1LDYSMT5 50/50 3.66 MW 3.66 MW
315060 1CHESTF5 Adder 43.44 MW 36.92 MW
315065 1CHESTF6 Adder 13.29 MW 11.29 MW
315073 1STONECA Adder 4.68 MW 3.98 MW
315083 1SPRUNCA Adder 6.19 MW 5.26 MW
315084 1SPRUNCB Adder 6.19 MW 5.26 MW
315092 1YORKTN3 Adder 95.21 MW 80.92 MW
925865 AC1-065 E Adder 11.67 MW 9.92 MW
926412 AC1-112 E Adder 0.78 MW 0.66 MW
926472 AC1-118 E Adder 0.89 MW 0.76 MW
926662 AC1-147 E Adder 0.87 MW 0.74 MW
926755 AC1-161 E Adder 8.5 MW 7.22 MW
927226 AC1-216 E Adder 5.2 MW 4.42 MW
934392 AD1-063 E Adder 0.75 MW 0.64 MW
934782 AD1-105 E Adder 3.91 MW 3.33 MW
936582 AD2-073 E Adder 0.86 MW 0.73 MW
936591 AD2-074 C Adder 4.14 MW 3.52 MW
936592 AD2-074 E Adder 6.76 MW 5.74 MW
942152 AE2-227 E Adder 1.0 MW 0.85 MW
942162 AE2-228 E Adder 0.97 MW 0.82 MW
943741 AF1-042 C Adder 2.17 MW 1.84 MW
943742 AF1-042 E Adder 3.54 MW 3.01 MW
944491 AF1-114 C Adder 5.64 MW 4.79 MW
944492 AF1-114 E Adder 7.78 MW 6.62 MW
960091 AF2-300 C 50/50 1.72 MW 1.72 MW
960092 AF2-300 E 50/50 1.14 MW 1.14 MW
961951 AG1-038 C Adder 2.4 MW 2.04 MW
961952 AG1-038 E Adder 3.31 MW 2.81 MW
966661 AG1-536 C Adder 4.07 MW 3.46 MW
966662 AG1-536 E Adder 5.47 MW 4.65 MW
966871 AG1-558 C Adder 1.71 MW 1.46 MW
966872 AG1-558 E Adder 0.86 MW 0.73 MW
966881 AG1-559 C 50/50 1.9 MW 1.9 MW
966882 AG1-559 E 50/50 0.96 MW 0.96 MW
315225 1N ANNA1 50/50 21.58 MW 21.58 MW
315226 1N ANNA2 50/50 21.59 MW 21.59 MW
315260 1GOSPORTA Adder 1.4 MW 1.19 MW
315261 1GOSPORTB Adder 1.78 MW 1.51 MW
315262 1GOSPORTC Adder 1.51 MW 1.28 MW
316076 AC2-137 E Adder 0.92 MW 0.78 MW
316078 AC2-138 E Adder 0.72 MW 0.61 MW
316157 AD2-030 E Adder 0.84 MW 0.71 MW
916192 Z1-068 E Adder 1.23 MW 1.04 MW
923842 AB2-024 E Adder 1.25 MW 1.07 MW
925022 AB2-158 E Adder 3.34 MW 2.83 MW
930122 AB1-027 E Adder 0.95 MW 0.81 MW
938552 AE1-074 E Adder 0.83 MW 0.7 MW
939312 AE1-162 E Adder 0.95 MW 0.81 MW
946262 AF1-291 E Adder 0.97 MW 0.83 MW
957411 AF2-035 C 50/50 6.86 MW 6.86 MW
957412 AF2-035 E 50/50 3.43 MW 3.43 MW
957601 AF2-054 C Adder 1.49 MW 1.27 MW
957602 AF2-054 E Adder 1.0 MW 0.85 MW
962861 AG1-135 C Adder 4.58 MW 3.89 MW
962862 AG1-135 E Adder 3.05 MW 2.59 MW
962962 AG1-145 E Adder 0.98 MW 0.83 MW
962971 AG1-146 C Adder 2.28 MW 1.93 MW
962972 AG1-146 E Adder 1.52 MW 1.29 MW
962981 AG1-147 C Adder 5.31 MW 4.51 MW
962982 AG1-147 E Adder 3.54 MW 3.01 MW
963051 AG1-154 C 50/50 3.01 MW 3.01 MW
963052 AG1-154 E 50/50 4.51 MW 4.51 MW
963611 AG1-210 C Adder 0.51 MW 0.44 MW
963612 AG1-210 E Adder 0.77 MW 0.65 MW
964211 AG1-282 C Adder 1.54 MW 1.3 MW
964212 AG1-282 E Adder 1.02 MW 0.87 MW
965441 AG1-412 C 50/50 11.91 MW 11.91 MW
965442 AG1-412 E 50/50 17.87 MW 17.87 MW
925332 AB2-190 E Adder 5.45 MW 4.63 MW
925522 AC1-027 E Adder 0.8 MW 0.68 MW
942001 AE2-212 C Adder 1.44 MW 1.23 MW
942002 AE2-212 E Adder 0.96 MW 0.82 MW
957832 AF2-077 E Adder 0.98 MW 0.84 MW
957971 AF2-091 C Adder 1.92 MW 1.63 MW
957972 AF2-091 E Adder 2.65 MW 2.25 MW
966331 AG1-502 C Adder 7.66 MW 6.51 MW
966332 AG1-502 E Adder 1.91 MW 1.63 MW
966341 AG1-503 C Adder 1.91 MW 1.63 MW
966342 AG1-503 E Adder 0.48 MW 0.41 MW
313811 6ELKO L286 Adder 0.96 MW 0.81 MW
314181 3NORNECK Adder 0.68 MW 0.58 MW
933291 AC2-141 C Adder 19.9 MW 16.92 MW
933292 AC2-141 E Adder 8.5 MW 7.22 MW
934011 AD1-025 C Adder 11.36 MW 9.65 MW
934012 AD1-025 E Adder 6.73 MW 5.72 MW
927041 AC1-191 C Adder 6.88 MW 5.85 MW
927042 AC1-191 E Adder 3.43 MW 2.91 MW
313053 6PAPERMILL Adder 4.64 MW 3.94 MW
316160 AE1-175 E Adder 0.81 MW 0.69 MW
316233 AE1-074 C Adder 1.64 MW 1.4 MW
316240 AF1-291 C Adder 1.46 MW 1.24 MW
316301 AE2-228 C Adder 1.46 MW 1.24 MW
316304 AE2-227 C Adder 1.5 MW 1.27 MW
926785 AC1-164_E Adder 12.45 MW 10.58 MW
939612 AE1-191 E Adder 4.0 MW 3.4 MW
963221 AG1-171 C Adder 1.45 MW 1.23 MW
963222 AG1-171 E Adder 0.96 MW 0.82 MW
963231 AG1-172 C Adder 1.45 MW 1.23 MW
963232 AG1-172 E Adder 0.96 MW 0.82 MW
963241 AG1-173 C Adder 1.45 MW 1.23 MW
963242 AG1-173 E Adder 0.96 MW 0.82 MW
926004 AC1-076_E Adder 2.93 MW 2.49 MW
315037 1LDYSMT1 50/50 3.5 MW 3.5 MW
315038 1LDYSMT2 50/50 3.55 MW 3.55 MW
316427 AG1-213 C 50/50 0.57 MW 0.57 MW
316411 AF1-147_GEN1 Adder -5.71 MW -4.86 MW
316415 AF1-147_GEN2 Adder -5.71 MW -4.86 MW
939246 AE1-155 E Adder 6.59 MW 5.6 MW
924814 AB2-134 E Adder 8.51 MW 7.23 MW
316084 AB2-161 E Adder 3.64 MW 3.1 MW
316044 AC1-158 C1 50/50 3.95 MW 3.95 MW
316045 AC1-158 C2 50/50 3.95 MW 3.95 MW
926739 AC1-158 E1 50/50 11.08 MW 11.08 MW
926740 AC1-158 E2 50/50 11.08 MW 11.08 MW
932046 AC2-012 E Adder 8.58 MW 7.29 MW
934146 AD1-041 E Adder 2.5 MW 2.12 MW
934576 AD1-082 E Adder 2.9 MW 2.47 MW
961611 AG1-000B C Adder 10.65 MW 9.05 MW
941591 AE2-156 C Adder 11.72 MW 9.97 MW
942371 AE2-250 C Adder 6.53 MW 5.55 MW
942372 AE2-250 E Adder 3.44 MW 2.93 MW
944581 AF1-123 C Adder 29.66 MW 25.21 MW
944582 AF1-123 E Adder 67.91 MW 57.73 MW
944591 AF1-124 C Adder 29.76 MW 25.3 MW
944592 AF1-124 E Adder 68.16 MW 57.94 MW
944601 AF1-125 C Adder 29.2 MW 24.82 MW
944602 AF1-125 E Adder 66.85 MW 56.82 MW
944631 AF1-128 C Adder 27.18 MW 23.1 MW
957431 AF2-037 C Adder 7.41 MW 6.3 MW
957432 AF2-037 E Adder 4.94 MW 4.2 MW
957691 AF2-063 C Adder 11.82 MW 10.05 MW
957692 AF2-063 E Adder 7.88 MW 6.7 MW
958261 AF2-120 C Adder 4.74 MW 4.03 MW
958262 AF2-120 E Adder 3.16 MW 2.68 MW
962271 AG1-075 C Adder 11.27 MW 9.58 MW
962272 AG1-075 E Adder 6.87 MW 5.84 MW
964421 AG1-305 C Adder 4.97 MW 4.22 MW
964422 AG1-305 E Adder 3.31 MW 2.81 MW
965281 AG1-393 C Adder 1.45 MW 1.23 MW
965282 AG1-393 E Adder 0.97 MW 0.82 MW
935161 AD1-151 C Adder 10.88 MW 9.24 MW
935162 AD1-151 E Adder 7.25 MW 6.16 MW
939191 AE1-149 C Adder 7.11 MW 6.04 MW
939192 AE1-149 E Adder 4.74 MW 4.03 MW
939261 AE1-157 C 50/50 11.34 MW 11.34 MW
939262 AE1-157 E 50/50 6.15 MW 6.15 MW
939602 AE1-190 E Adder 1.0 MW 0.85 MW
940431 AE2-027 C Adder 8.73 MW 7.42 MW
940432 AE2-027 E Adder 5.82 MW 4.95 MW
940551 AE2-041 C Adder 5.01 MW 4.26 MW
941282 AE2-122 E Adder 42.03 MW 35.72 MW
942191 AE2-231 C 50/50 3.77 MW 3.77 MW
942192 AE2-231 E 50/50 2.52 MW 2.52 MW
943471 AF1-018 C Adder 5.01 MW 4.26 MW
944641 AF1-129 C Adder 69.3 MW 58.9 MW
957191 AF2-013 C Adder 13.76 MW 11.7 MW
963622 AG1-213 E 50/50 0.57 MW 0.57 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 8.78 MW 8.78 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.42 MW 10.42 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 52.06 MW 52.06 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.99 MW 3.99 MW
NY PJM->LTFIMP_NY CLTF 1.97 MW 1.97 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.47 MW 0.47 MW
WEC LTFEXP_WEC->PJM CLTF 0.21 MW 0.21 MW
CPLE LTFEXP_CPLE->PJM CLTF 6.21 MW 6.21 MW
TVA LTFEXP_TVA->PJM CLTF 3.1 MW 3.1 MW
MEC LTFEXP_MEC->PJM CLTF 1.54 MW 1.54 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.87 MW 3.87 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.1 MW 0.1 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 25.49 MW 25.49 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.96 MW 2.96 MW

Details for 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P4-2: 56372_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 111.53 3144.0 C 3506.36 251.24
Elimination
Base Case Details for Eliminated Flowgate 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P4-2: 56372_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.62 MW 0.53 MW
961942 AG1-037 E Adder 0.42 MW 0.35 MW
962331 AG1-082 C Adder 2.5 MW 2.13 MW
962332 AG1-082 E Adder 1.67 MW 1.42 MW
962341 AG1-083 C Adder 2.5 MW 2.13 MW
962342 AG1-083 E Adder 1.67 MW 1.42 MW
963041 AG1-153 C Adder 6.9 MW 5.86 MW
963042 AG1-153 E Adder 10.35 MW 8.79 MW
964801 AG1-343 C Adder 7.39 MW 6.28 MW
964802 AG1-343 E Adder 5.81 MW 4.94 MW
966801 AG1-551 C Adder 2.56 MW 2.18 MW
966802 AG1-551 E Adder 1.35 MW 1.15 MW
966811 AG1-552 C Adder 2.22 MW 1.89 MW
966812 AG1-552 E Adder 1.05 MW 0.9 MW
965291 AG1-394 C Adder 1.06 MW 0.9 MW
965292 AG1-394 E Adder 1.94 MW 1.65 MW
314541 3WATKINS Adder 0.91 MW 0.77 MW
918492 AA1-063AE OP Adder 4.66 MW 3.96 MW
918532 AA1-067 E Adder 0.85 MW 0.72 MW
919692 AA2-053 E OP Adder 4.68 MW 3.98 MW
920042 AA2-088 E OP Adder 13.24 MW 11.25 MW
927146 AC1-208 E Adder 4.42 MW 3.75 MW
934521 AD1-076 C Adder 16.64 MW 14.14 MW
934522 AD1-076 E Adder 8.48 MW 7.21 MW
942931 AE2-313 C Adder 44.84 MW 38.11 MW
942932 AE2-313 E Adder 29.89 MW 25.41 MW
943172 AE2-346 E Adder 0.75 MW 0.64 MW
944011 AF1-069 C Adder 16.35 MW 13.9 MW
944012 AF1-069 E Adder 6.35 MW 5.4 MW
316141 AB2-099 E Adder 0.31 MW 0.27 MW
900672 V4-068 E Adder 0.44 MW 0.38 MW
940492 AE2-034 E Adder 4.34 MW 3.69 MW
941031 AE2-094 C Adder 50.04 MW 42.53 MW
941032 AE2-094 E Adder 22.41 MW 19.05 MW
957481 AF2-042 C Adder 60.63 MW 51.53 MW
957482 AF2-042 E Adder 40.42 MW 34.36 MW
957521 AF2-046 C Adder 19.52 MW 16.59 MW
957522 AF2-046 E Adder 9.87 MW 8.39 MW
957861 AF2-080 C Adder 8.78 MW 7.46 MW
957862 AF2-080 E Adder 3.89 MW 3.31 MW
314539 3UNCAMP Adder 8.15 MW 6.93 MW
916042 Z1-036 E Adder 42.59 MW 36.2 MW
938771 AE1-103 C Adder 3.98 MW 3.38 MW
938772 AE1-103 E Adder 5.5 MW 4.67 MW
314507 3THOMPSN Adder 3.21 MW 2.73 MW
314525 6KINGFORK Adder 1.48 MW 1.25 MW
314550 6HICKORY 50/50 3.52 MW 3.52 MW
315092 1YORKTN3 Adder 180.07 MW 153.06 MW
926662 AC1-147 E 50/50 2.11 MW 2.11 MW
926755 AC1-161 E 50/50 24.45 MW 24.45 MW
935112 AD1-144 E Adder 1.37 MW 1.17 MW
942341 AE2-247 C Adder 1.87 MW 1.59 MW
942342 AE2-247 E Adder 2.58 MW 2.19 MW
943461 AF1-017 C Adder 1.69 MW 1.44 MW
943462 AF1-017 E Adder 2.76 MW 2.35 MW
943612 AF1-032 E Adder 1.42 MW 1.21 MW
944871 AF1-152 C Adder 8.04 MW 6.83 MW
944872 AF1-152 E Adder 5.36 MW 4.56 MW
315098 1CHESPKA 50/50 0.64 MW 0.64 MW
315099 1CHESPKB 50/50 1.07 MW 1.07 MW
315108 1ELIZAR1 50/50 4.76 MW 4.76 MW
315109 1ELIZAR2 50/50 4.68 MW 4.68 MW
315110 1ELIZAR3 50/50 4.82 MW 4.82 MW
315233 1SURRY 2 50/50 48.42 MW 48.42 MW
315260 1GOSPORTA Adder 3.39 MW 2.88 MW
315261 1GOSPORTB 50/50 4.33 MW 4.33 MW
315262 1GOSPORTC 50/50 3.68 MW 3.68 MW
913392 Y1-086 E Adder 3.43 MW 2.92 MW
916192 Z1-068 E 50/50 3.02 MW 3.02 MW
923832 AB2-022 E Adder 1.94 MW 1.65 MW
939312 AE1-162 E Adder 1.86 MW 1.58 MW
957492 AF2-043 E Adder 2.19 MW 1.86 MW
901082 W1-029 E Adder 48.52 MW 41.24 MW
917122 Z2-027 E Adder 2.08 MW 1.77 MW
925522 AC1-027 E 50/50 1.95 MW 1.95 MW
941501 AE2-147 C Adder 24.12 MW 20.51 MW
941502 AE2-147 E Adder 16.08 MW 13.67 MW
957871 AF2-081 C 50/50 15.97 MW 15.97 MW
957872 AF2-081 E 50/50 6.85 MW 6.85 MW
958161 AF2-110 C Adder 1.98 MW 1.68 MW
958162 AF2-110 E Adder 3.15 MW 2.68 MW
927021 AC1-189 C Adder 9.66 MW 8.21 MW
927022 AC1-189 E Adder 4.81 MW 4.09 MW
933291 AC2-141 C 50/50 57.27 MW 57.27 MW
933292 AC2-141 E 50/50 24.45 MW 24.45 MW
939411 AE1-173 C Adder 131.83 MW 112.06 MW
939412 AE1-173 E Adder 87.89 MW 74.7 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 11.72 MW 9.96 MW
933982 AD1-022 E Adder 6.38 MW 5.42 MW
961681 AG1-008 C Adder 19.52 MW 16.59 MW
961682 AG1-008 E Adder 9.87 MW 8.39 MW
314594 6PLYMOUTH TP Adder 0.44 MW 0.38 MW
314632 6AYDLETT TAP Adder 2.15 MW 1.83 MW
316036 AC1-147 C 50/50 0.54 MW 0.54 MW
316185 AD1-033 C 50/50 1.85 MW 1.85 MW
316210 AC1-098 C Adder 6.92 MW 5.88 MW
316212 AC1-099 C Adder 2.32 MW 1.97 MW
316274 AC1-208 C Adder 9.94 MW 8.45 MW
316294 AC1-161 C 50/50 8.67 MW 8.67 MW
316316 AC1-027 C 50/50 0.47 MW 0.47 MW
917332 KELFORD E Adder 1.97 MW 1.68 MW
926206 AC1-098 E Adder 4.12 MW 3.5 MW
926214 AC1-099 E Adder 1.36 MW 1.16 MW
934065 AD1-033 E 50/50 8.13 MW 8.13 MW
937226 AE2-253 E 50/50 9.38 MW 9.38 MW
918512 AA1-065 E OP Adder 7.05 MW 5.99 MW
316017 AA1-139 ULT1 50/50 1.6 MW 1.6 MW
316018 AA1-139 ULT2 50/50 1.6 MW 1.6 MW
919153 AA1-139 E2 50/50 6.53 MW 6.53 MW
919152 AA1-139 E1 50/50 6.53 MW 6.53 MW
920692 AA2-178 E Adder 5.78 MW 4.92 MW
925122 AB2-169 E Adder 7.34 MW 6.24 MW
316375 AC2-012 C 50/50 2.0 MW 2.0 MW
932046 AC2-012 E 50/50 20.87 MW 20.87 MW
316311 AC2-079 C Adder 7.32 MW 6.23 MW
932596 AC2-079 E Adder 11.95 MW 10.16 MW
316349 AD2-085 C Adder 4.31 MW 3.67 MW
936666 AD2-085 E Adder 7.03 MW 5.98 MW
316388 AE2-253 GEN 50/50 2.92 MW 2.92 MW
961611 AG1-000B C Adder 16.32 MW 13.88 MW
941591 AE2-156 C 50/50 28.6 MW 28.6 MW
944581 AF1-123 C 50/50 76.09 MW 76.09 MW
944582 AF1-123 E 50/50 174.25 MW 174.25 MW
944591 AF1-124 C 50/50 76.36 MW 76.36 MW
944592 AF1-124 E 50/50 174.88 MW 174.88 MW
944601 AF1-125 C 50/50 74.92 MW 74.92 MW
944602 AF1-125 E 50/50 171.51 MW 171.51 MW
965691 AG1-437 C Adder 13.37 MW 11.36 MW
965692 AG1-437 E Adder 8.91 MW 7.58 MW
965701 AG1-438 C Adder 13.37 MW 11.36 MW
965702 AG1-438 E Adder 8.91 MW 7.58 MW
965741 AG1-442 C Adder 7.8 MW 6.63 MW
965751 AG1-443 C Adder 7.8 MW 6.63 MW
965811 AG1-449 C Adder 29.04 MW 24.68 MW
932631 AC2-084 C Adder 7.4 MW 6.29 MW
932632 AC2-084 E Adder 3.64 MW 3.1 MW
934501 AD1-074 C Adder 45.81 MW 38.94 MW
934502 AD1-074 E Adder 23.32 MW 19.82 MW
934511 AD1-075 C Adder 11.45 MW 9.73 MW
934512 AD1-075 E Adder 5.83 MW 4.96 MW
934612 AD1-087 E Adder 3.91 MW 3.32 MW
935172 AD1-152 E Adder 0.02 MW 0.01 MW
937482 AD2-202 E Adder 1.14 MW 0.97 MW
938531 AE1-072 C Adder 27.96 MW 23.77 MW
938532 AE1-072 E Adder 14.58 MW 12.39 MW
940641 AE2-051 C Adder 24.16 MW 20.54 MW
940642 AE2-051 E Adder 16.11 MW 13.69 MW
941101 AE2-104 C Adder 4.85 MW 4.12 MW
941102 AE2-104 E Adder 7.71 MW 6.55 MW
941281 AE2-122 C 50/50 45.75 MW 45.75 MW
941282 AE2-122 E 50/50 184.62 MW 184.62 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 28.17 MW 28.17 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 21.35 MW 21.35 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 97.38 MW 97.38 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.43 MW 3.43 MW
NY PJM->LTFIMP_NY CLTF 1.61 MW 1.61 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.13 MW 1.13 MW
WEC LTFEXP_WEC->PJM CLTF 0.59 MW 0.59 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.93 MW 11.93 MW
TVA LTFEXP_TVA->PJM CLTF 5.86 MW 5.86 MW
MEC LTFEXP_MEC->PJM CLTF 3.65 MW 3.65 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.46 MW 7.46 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.22 MW 0.22 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 21.83 MW 21.83 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.69 MW 5.69 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P4-2: H2T574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P4-2: H2T574_SRT-S
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 115.19 3940.0 C 4538.63 207.65
Elimination
Base Case Details for Eliminated Flowgate 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P4-2: H2T574_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 9.3 MW 9.3 MW
963042 AG1-153 E 50/50 13.95 MW 13.95 MW
964801 AG1-343 C Adder 8.0 MW 6.8 MW
964802 AG1-343 E Adder 6.29 MW 5.34 MW
965291 AG1-394 C Adder 1.14 MW 0.97 MW
965292 AG1-394 E Adder 2.1 MW 1.79 MW
966621 AG1-532 C Adder 1.87 MW 1.59 MW
966622 AG1-532 E Adder 1.25 MW 1.06 MW
314541 3WATKINS Adder 0.93 MW 0.79 MW
314572 3EMPORIA Adder 0.58 MW 0.49 MW
315153 1CLOVER1 50/50 17.23 MW 17.23 MW
315154 1CLOVER2 50/50 17.07 MW 17.07 MW
920042 AA2-088 E OP Adder 14.21 MW 12.08 MW
934521 AD1-076 C Adder 16.58 MW 14.1 MW
934522 AD1-076 E Adder 8.45 MW 7.18 MW
942931 AE2-313 C 50/50 60.44 MW 60.44 MW
942932 AE2-313 E 50/50 40.29 MW 40.29 MW
944011 AF1-069 C 50/50 22.04 MW 22.04 MW
944012 AF1-069 E 50/50 8.56 MW 8.56 MW
960081 AF2-299 C Adder 2.7 MW 2.29 MW
960082 AF2-299 E Adder 1.8 MW 1.53 MW
900672 V4-068 E Adder 0.48 MW 0.41 MW
923263 AB1-132 E OP Adder 8.25 MW 7.01 MW
923573 AB1-173 E OP Adder 4.38 MW 3.72 MW
940492 AE2-034 E Adder 4.18 MW 3.56 MW
941031 AE2-094 C 50/50 67.44 MW 67.44 MW
941032 AE2-094 E 50/50 30.2 MW 30.2 MW
946281 AF1-292 C Adder 2.06 MW 1.75 MW
946282 AF1-292 E Adder 1.38 MW 1.17 MW
957481 AF2-042 C 50/50 81.84 MW 81.84 MW
957482 AF2-042 E 50/50 54.56 MW 54.56 MW
957521 AF2-046 C Adder 10.45 MW 8.88 MW
314539 3UNCAMP Adder 8.14 MW 6.92 MW
916042 Z1-036 E Adder 38.97 MW 33.12 MW
938771 AE1-103 C Adder 3.92 MW 3.33 MW
938772 AE1-103 E Adder 5.41 MW 4.6 MW
314507 3THOMPSN Adder 2.73 MW 2.32 MW
314525 6KINGFORK Adder 1.32 MW 1.12 MW
314550 6HICKORY 50/50 2.98 MW 2.98 MW
926662 AC1-147 E Adder 1.79 MW 1.52 MW
926755 AC1-161 E 50/50 18.15 MW 18.15 MW
935112 AD1-144 E Adder 1.22 MW 1.04 MW
943612 AF1-032 E Adder 1.25 MW 1.06 MW
944871 AF1-152 C Adder 7.18 MW 6.1 MW
944872 AF1-152 E Adder 4.78 MW 4.07 MW
315102 1BRUNSWICKG1 50/50 12.72 MW 12.72 MW
315103 1BRUNSWICKG2 50/50 12.72 MW 12.72 MW
315104 1BRUNSWICKG3 50/50 12.72 MW 12.72 MW
315105 1BRUNSWICKS1 50/50 26.44 MW 26.44 MW
315108 1ELIZAR1 50/50 4.02 MW 4.02 MW
315109 1ELIZAR2 50/50 3.95 MW 3.95 MW
315110 1ELIZAR3 50/50 4.07 MW 4.07 MW
315241 1Z1-086 GT1 50/50 16.34 MW 16.34 MW
315242 1Z1-086 GT2 50/50 16.34 MW 16.34 MW
315243 1Z1-086 GT3 50/50 16.34 MW 16.34 MW
315244 1Z1-086 ST 50/50 28.45 MW 28.45 MW
315260 1GOSPORTA Adder 2.88 MW 2.44 MW
315261 1GOSPORTB Adder 3.67 MW 3.12 MW
315262 1GOSPORTC Adder 3.12 MW 2.65 MW
913392 Y1-086 E Adder 2.99 MW 2.54 MW
916192 Z1-068 E 50/50 2.56 MW 2.56 MW
923832 AB2-022 E Adder 1.69 MW 1.44 MW
923852 AB2-025 E 50/50 1.62 MW 1.62 MW
957492 AF2-043 E Adder 1.93 MW 1.64 MW
901082 W1-029 E Adder 43.3 MW 36.8 MW
917122 Z2-027 E Adder 1.83 MW 1.55 MW
925522 AC1-027 E 50/50 1.65 MW 1.65 MW
941501 AE2-147 C Adder 21.53 MW 18.3 MW
941502 AE2-147 E Adder 14.35 MW 12.2 MW
957871 AF2-081 C 50/50 13.63 MW 13.63 MW
957872 AF2-081 E 50/50 5.84 MW 5.84 MW
958161 AF2-110 C Adder 1.83 MW 1.55 MW
958162 AF2-110 E Adder 2.9 MW 2.47 MW
926071 AC1-086 C Adder 28.35 MW 24.09 MW
926072 AC1-086 E Adder 12.9 MW 10.97 MW
933291 AC2-141 C 50/50 42.51 MW 42.51 MW
933292 AC2-141 E 50/50 18.15 MW 18.15 MW
939411 AE1-173 C 50/50 146.04 MW 146.04 MW
939412 AE1-173 E 50/50 97.36 MW 97.36 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
933981 AD1-022 C Adder 11.86 MW 10.08 MW
933982 AD1-022 E Adder 6.46 MW 5.49 MW
962572 AG1-106 E Adder 1.83 MW 1.56 MW
962571 AG1-106 C Adder 4.01 MW 3.41 MW
314594 6PLYMOUTH TP Adder 0.44 MW 0.37 MW
314632 6AYDLETT TAP 50/50 1.85 MW 1.85 MW
316185 AD1-033 C 50/50 1.56 MW 1.56 MW
316294 AC1-161 C 50/50 6.44 MW 6.44 MW
316315 AB2-025 C 50/50 0.53 MW 0.53 MW
316316 AC1-027 C 50/50 0.4 MW 0.4 MW
924516 AB2-100 E1 Adder 3.95 MW 3.35 MW
924517 AB2-100 E2 Adder 3.95 MW 3.35 MW
934065 AD1-033 E 50/50 6.85 MW 6.85 MW
937226 AE2-253 E 50/50 7.97 MW 7.97 MW
316017 AA1-139 ULT1 50/50 1.37 MW 1.37 MW
316018 AA1-139 ULT2 50/50 1.37 MW 1.37 MW
919153 AA1-139 E2 50/50 5.58 MW 5.58 MW
919152 AA1-139 E1 50/50 5.58 MW 5.58 MW
920692 AA2-178 E Adder 5.58 MW 4.74 MW
923994 AB2-040_E Adder 8.21 MW 6.98 MW
316088 AB2-174 E Adder 8.7 MW 7.39 MW
932046 AC2-012 E Adder 17.7 MW 15.04 MW
316311 AC2-079 C Adder 7.38 MW 6.28 MW
932596 AC2-079 E Adder 12.05 MW 10.24 MW
316388 AE2-253 GEN 50/50 2.49 MW 2.49 MW
941591 AE2-156 C Adder 24.21 MW 20.58 MW
944581 AF1-123 C 50/50 62.89 MW 62.89 MW
944582 AF1-123 E 50/50 144.01 MW 144.01 MW
944591 AF1-124 C 50/50 63.12 MW 63.12 MW
944592 AF1-124 E 50/50 144.53 MW 144.53 MW
944601 AF1-125 C 50/50 61.92 MW 61.92 MW
944602 AF1-125 E 50/50 141.75 MW 141.75 MW
965691 AG1-437 C Adder 13.71 MW 11.65 MW
965692 AG1-437 E Adder 9.14 MW 7.77 MW
965701 AG1-438 C Adder 13.71 MW 11.65 MW
965702 AG1-438 E Adder 9.14 MW 7.77 MW
965741 AG1-442 C Adder 8.0 MW 6.8 MW
965751 AG1-443 C Adder 8.0 MW 6.8 MW
965811 AG1-449 C 50/50 39.14 MW 39.14 MW
934501 AD1-074 C Adder 45.66 MW 38.81 MW
934502 AD1-074 E Adder 23.25 MW 19.76 MW
934511 AD1-075 C Adder 11.42 MW 9.7 MW
934512 AD1-075 E Adder 5.81 MW 4.94 MW
934611 AD1-087 C 50/50 1.7 MW 1.7 MW
934612 AD1-087 E 50/50 5.28 MW 5.28 MW
935171 AD1-152 C 50/50 1.75 MW 1.75 MW
935172 AD1-152 E 50/50 7.75 MW 7.75 MW
937481 AD2-202 C 50/50 0.49 MW 0.49 MW
937482 AD2-202 E 50/50 1.54 MW 1.54 MW
938531 AE1-072 C 50/50 23.96 MW 23.96 MW
938532 AE1-072 E 50/50 12.49 MW 12.49 MW
940481 AE2-033 C 50/50 22.47 MW 22.47 MW
940482 AE2-033 E 50/50 15.15 MW 15.15 MW
940541 AE2-040 C 50/50 4.0 MW 4.0 MW
940641 AE2-051 C 50/50 29.14 MW 29.14 MW
940642 AE2-051 E 50/50 19.43 MW 19.43 MW
941101 AE2-104 C Adder 4.48 MW 3.8 MW
941102 AE2-104 E Adder 7.11 MW 6.05 MW
941281 AE2-122 C 50/50 38.68 MW 38.68 MW
941282 AE2-122 E 50/50 156.1 MW 156.1 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 55.09 MW 55.09 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 35.59 MW 35.59 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 137.02 MW 137.02 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.68 MW 5.68 MW
NY PJM->LTFIMP_NY CLTF 2.59 MW 2.59 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.18 MW 2.18 MW
WEC LTFEXP_WEC->PJM CLTF 1.13 MW 1.13 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.11 MW 16.11 MW
TVA LTFEXP_TVA->PJM CLTF 9.38 MW 9.38 MW
MEC LTFEXP_MEC->PJM CLTF 6.58 MW 6.58 MW
LAGN LTFEXP_LAGN->PJM CLTF 11.83 MW 11.83 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.42 MW 0.42 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.11 MW 36.11 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.68 MW 7.68 MW

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P4-2: 568T575_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P4-2: 568T575_SRT-A
CONTINGENCY 'DVP_P4-2: 568T575_SRT-A'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 121.21 3940.0 C 4775.7 139.95
Elimination
Base Case Details for Eliminated Flowgate 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P4-2: 568T575_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C Adder 5.79 MW 4.92 MW
963042 AG1-153 E Adder 8.69 MW 7.38 MW
964801 AG1-343 C Adder 5.54 MW 4.71 MW
964802 AG1-343 E Adder 4.35 MW 3.7 MW
965291 AG1-394 C Adder 0.79 MW 0.67 MW
965292 AG1-394 E Adder 1.46 MW 1.24 MW
966621 AG1-532 C Adder 1.32 MW 1.12 MW
966622 AG1-532 E Adder 0.88 MW 0.75 MW
314541 3WATKINS Adder 0.64 MW 0.55 MW
314572 3EMPORIA Adder 0.4 MW 0.34 MW
918492 AA1-063AE OP Adder 3.79 MW 3.22 MW
920042 AA2-088 E OP Adder 9.84 MW 8.37 MW
934521 AD1-076 C Adder 11.3 MW 9.6 MW
942931 AE2-313 C Adder 37.57 MW 31.94 MW
942932 AE2-313 E Adder 25.05 MW 21.29 MW
944011 AF1-069 C 50/50 13.62 MW 13.62 MW
944012 AF1-069 E 50/50 5.29 MW 5.29 MW
960081 AF2-299 C Adder 1.9 MW 1.62 MW
960082 AF2-299 E Adder 1.27 MW 1.08 MW
900672 V4-068 E Adder 0.33 MW 0.28 MW
923263 AB1-132 E OP Adder 5.68 MW 4.83 MW
923573 AB1-173 E OP Adder 3.07 MW 2.61 MW
940492 AE2-034 E Adder 2.85 MW 2.42 MW
941031 AE2-094 C 50/50 41.69 MW 41.69 MW
941032 AE2-094 E 50/50 18.67 MW 18.67 MW
946281 AF1-292 C Adder 1.45 MW 1.24 MW
946282 AF1-292 E Adder 0.97 MW 0.82 MW
957481 AF2-042 C Adder 53.82 MW 45.74 MW
957482 AF2-042 E Adder 35.88 MW 30.5 MW
957521 AF2-046 C Adder 14.6 MW 12.41 MW
957522 AF2-046 E Adder 7.38 MW 6.27 MW
314539 3UNCAMP Adder 5.64 MW 4.8 MW
916042 Z1-036 E Adder 26.56 MW 22.57 MW
938771 AE1-103 C Adder 2.72 MW 2.31 MW
938772 AE1-103 E Adder 3.75 MW 3.19 MW
933502 AC2-165 E Adder 7.49 MW 6.37 MW
314331 6POE Adder 1.28 MW 1.09 MW
314507 3THOMPSN Adder 1.87 MW 1.59 MW
314525 6KINGFORK Adder 0.92 MW 0.78 MW
314550 6HICKORY Adder 2.02 MW 1.72 MW
315083 1SPRUNCA Adder 8.07 MW 6.86 MW
315084 1SPRUNCB Adder 8.07 MW 6.86 MW
926662 AC1-147 E Adder 1.23 MW 1.04 MW
926755 AC1-161 E Adder 12.03 MW 10.22 MW
935112 AD1-144 E Adder 0.86 MW 0.73 MW
942341 AE2-247 C Adder 1.38 MW 1.17 MW
942342 AE2-247 E Adder 1.9 MW 1.62 MW
943461 AF1-017 C Adder 1.25 MW 1.06 MW
943462 AF1-017 E Adder 2.03 MW 1.73 MW
943612 AF1-032 E Adder 0.86 MW 0.73 MW
944871 AF1-152 C Adder 4.89 MW 4.16 MW
944872 AF1-152 E Adder 3.26 MW 2.77 MW
958502 AF2-144 E Adder 1.25 MW 1.06 MW
315172 1LOISA A 50/50 2.54 MW 2.54 MW
315173 1LOISA B 50/50 2.55 MW 2.55 MW
315174 1LOISA C 50/50 2.55 MW 2.55 MW
315175 1LOISA D 50/50 2.55 MW 2.55 MW
315176 1LOISA E 50/50 5.2 MW 5.2 MW
315177 1S ANNAG1 50/50 2.49 MW 2.49 MW
315178 1S ANNAS1 50/50 1.28 MW 1.28 MW
315179 1S ANNAG2 50/50 2.49 MW 2.49 MW
315180 1S ANNAS2 50/50 1.28 MW 1.28 MW
315225 1N ANNA1 50/50 83.31 MW 83.31 MW
315226 1N ANNA2 50/50 83.33 MW 83.33 MW
315260 1GOSPORTA Adder 1.97 MW 1.68 MW
315261 1GOSPORTB Adder 2.52 MW 2.14 MW
315262 1GOSPORTC Adder 2.14 MW 1.82 MW
913392 Y1-086 E Adder 2.04 MW 1.73 MW
916192 Z1-068 E Adder 1.74 MW 1.48 MW
923832 AB2-022 E Adder 1.15 MW 0.98 MW
923852 AB2-025 E Adder 1.13 MW 0.96 MW
923862 AB2-026 E Adder 1.27 MW 1.08 MW
925022 AB2-158 E 50/50 9.71 MW 9.71 MW
938552 AE1-074 E Adder 1.27 MW 1.08 MW
938562 AE1-075 E Adder 1.08 MW 0.92 MW
939312 AE1-162 E Adder 1.27 MW 1.08 MW
957492 AF2-043 E Adder 1.32 MW 1.12 MW
966001 AG1-469 C 50/50 1.98 MW 1.98 MW
966002 AG1-469 E 50/50 0.99 MW 0.99 MW
901082 W1-029 E Adder 29.52 MW 25.1 MW
917122 Z2-027 E Adder 1.24 MW 1.06 MW
925522 AC1-027 E Adder 1.13 MW 0.96 MW
941501 AE2-147 C Adder 14.68 MW 12.48 MW
941502 AE2-147 E Adder 9.79 MW 8.32 MW
942001 AE2-212 C Adder 1.93 MW 1.64 MW
942002 AE2-212 E Adder 1.29 MW 1.09 MW
957871 AF2-081 C Adder 9.27 MW 7.88 MW
957872 AF2-081 E Adder 3.97 MW 3.38 MW
958161 AF2-110 C Adder 1.27 MW 1.08 MW
958162 AF2-110 E Adder 2.02 MW 1.71 MW
966331 AG1-502 C 50/50 14.5 MW 14.5 MW
966332 AG1-502 E 50/50 3.62 MW 3.62 MW
966341 AG1-503 C 50/50 3.62 MW 3.62 MW
966342 AG1-503 E 50/50 0.91 MW 0.91 MW
926071 AC1-086 C Adder 19.53 MW 16.6 MW
926072 AC1-086 E Adder 8.89 MW 7.56 MW
933291 AC2-141 C Adder 28.18 MW 23.95 MW
933292 AC2-141 E Adder 12.03 MW 10.22 MW
934621 AD1-088 C Adder 11.41 MW 9.7 MW
934622 AD1-088 E Adder 5.37 MW 4.56 MW
939411 AE1-173 C Adder 92.36 MW 78.51 MW
939412 AE1-173 E Adder 61.57 MW 52.34 MW
962572 AG1-106 E Adder 1.26 MW 1.07 MW
961681 AG1-008 C Adder 14.6 MW 12.41 MW
961682 AG1-008 E Adder 7.38 MW 6.27 MW
962571 AG1-106 C Adder 2.76 MW 2.35 MW
208900 BRIS G1 50/50 -2.65 MW -2.65 MW
208901 BRIS G2 50/50 -3.13 MW -3.13 MW
314594 6PLYMOUTH TP Adder 0.3 MW 0.25 MW
314632 6AYDLETT TAP Adder 1.26 MW 1.07 MW
316164 AC1-076_C 50/50 1.05 MW 1.05 MW
316170 AC1-121 C 50/50 2.77 MW 2.77 MW
316192 AB2-158 C 50/50 3.41 MW 3.41 MW
316233 AE1-074 C Adder 2.53 MW 2.15 MW
316254 AC1-120 C 50/50 8.05 MW 8.05 MW
316336 AC2-165 C Adder 9.96 MW 8.46 MW
924516 AB2-100 E1 Adder 2.74 MW 2.33 MW
924517 AB2-100 E2 Adder 2.74 MW 2.33 MW
934065 AD1-033 E Adder 4.65 MW 3.96 MW
937226 AE2-253 E Adder 5.42 MW 4.61 MW
926004 AC1-076_E 50/50 6.48 MW 6.48 MW
926486 AC1-120 E 50/50 4.15 MW 4.15 MW
926502 AC1-121 E 50/50 1.3 MW 1.3 MW
919153 AA1-139 E2 Adder 3.79 MW 3.22 MW
919152 AA1-139 E1 Adder 3.79 MW 3.22 MW
920692 AA2-178 E Adder 3.8 MW 3.23 MW
923994 AB2-040_E Adder 5.75 MW 4.89 MW
316084 AB2-161 E Adder 5.07 MW 4.31 MW
316088 AB2-174 E Adder 6.1 MW 5.19 MW
316044 AC1-158 C1 50/50 18.17 MW 18.17 MW
316045 AC1-158 C2 50/50 18.17 MW 18.17 MW
926739 AC1-158 E1 50/50 50.95 MW 50.95 MW
926740 AC1-158 E2 50/50 50.95 MW 50.95 MW
932046 AC2-012 E Adder 12.12 MW 10.3 MW
316311 AC2-079 C Adder 5.3 MW 4.5 MW
932596 AC2-079 E Adder 8.64 MW 7.34 MW
934576 AD1-082 E Adder 4.04 MW 3.44 MW
316349 AD2-085 C Adder 3.18 MW 2.7 MW
936666 AD2-085 E Adder 5.18 MW 4.41 MW
941591 AE2-156 C Adder 16.57 MW 14.09 MW
944581 AF1-123 C Adder 42.39 MW 36.03 MW
944582 AF1-123 E Adder 97.06 MW 82.5 MW
944591 AF1-124 C Adder 42.54 MW 36.16 MW
944592 AF1-124 E Adder 97.41 MW 82.8 MW
944601 AF1-125 C Adder 41.73 MW 35.47 MW
944602 AF1-125 E Adder 95.54 MW 81.21 MW
957431 AF2-037 C 50/50 24.12 MW 24.12 MW
957432 AF2-037 E 50/50 16.08 MW 16.08 MW
957691 AF2-063 C 50/50 38.5 MW 38.5 MW
957692 AF2-063 E 50/50 25.66 MW 25.66 MW
962491 AG1-098 C Adder 10.27 MW 8.73 MW
962492 AG1-098 E Adder 6.85 MW 5.82 MW
964421 AG1-305 C 50/50 16.17 MW 16.17 MW
964422 AG1-305 E 50/50 10.78 MW 10.78 MW
965601 AG1-428 C Adder 4.46 MW 3.79 MW
965602 AG1-428 E Adder 2.97 MW 2.53 MW
965811 AG1-449 C Adder 24.33 MW 20.68 MW
313764 3SOCKMAN Adder 0.66 MW 0.56 MW
934501 AD1-074 C Adder 31.1 MW 26.44 MW
934502 AD1-074 E Adder 15.83 MW 13.46 MW
934511 AD1-075 C Adder 5.53 MW 4.7 MW
934612 AD1-087 E Adder 3.53 MW 3.0 MW
935172 AD1-152 E Adder 5.21 MW 4.43 MW
937482 AD2-202 E Adder 1.03 MW 0.88 MW
938531 AE1-072 C Adder 16.29 MW 13.85 MW
938532 AE1-072 E Adder 8.49 MW 7.22 MW
939191 AE1-149 C Adder 9.8 MW 8.33 MW
939192 AE1-149 E Adder 6.54 MW 5.56 MW
940481 AE2-033 C Adder 15.64 MW 13.3 MW
940482 AE2-033 E Adder 10.55 MW 8.96 MW
940541 AE2-040 C Adder 2.78 MW 2.37 MW
940641 AE2-051 C 50/50 18.1 MW 18.1 MW
940642 AE2-051 E 50/50 12.06 MW 12.06 MW
941101 AE2-104 C Adder 3.11 MW 2.64 MW
941102 AE2-104 E Adder 4.94 MW 4.2 MW
941281 AE2-122 C Adder 26.37 MW 22.41 MW
941282 AE2-122 E Adder 106.4 MW 90.44 MW
316303 AF2-085 50/50 4.34 MW 4.34 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 24.83 MW 24.83 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 20.1 MW 20.1 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 88.33 MW 88.33 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.79 MW 5.79 MW
NY PJM->LTFIMP_NY CLTF 2.73 MW 2.73 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.08 MW 1.08 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.49 MW 10.49 MW
TVA LTFEXP_TVA->PJM CLTF 5.6 MW 5.6 MW
MEC LTFEXP_MEC->PJM CLTF 3.38 MW 3.38 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.03 MW 7.03 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.21 MW 0.21 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.85 MW 36.85 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.0 MW 5.0 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P4-2: 557T574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Breaker AC 119.69 3940.0 C 4715.74 233.33
Elimination
Base Case Details for Eliminated Flowgate 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P4-2: 557T574_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962331 AG1-082 C Adder 2.97 MW 2.52 MW
962341 AG1-083 C Adder 2.6 MW 2.21 MW
963041 AG1-153 C 50/50 9.87 MW 9.87 MW
963042 AG1-153 E 50/50 14.8 MW 14.8 MW
964801 AG1-343 C Adder 8.76 MW 7.44 MW
964802 AG1-343 E Adder 6.88 MW 5.85 MW
965291 AG1-394 C Adder 1.25 MW 1.06 MW
965292 AG1-394 E Adder 2.3 MW 1.96 MW
966621 AG1-532 C Adder 2.01 MW 1.71 MW
966622 AG1-532 E Adder 1.34 MW 1.14 MW
314541 3WATKINS Adder 1.02 MW 0.87 MW
315153 1CLOVER1 50/50 18.26 MW 18.26 MW
315154 1CLOVER2 50/50 18.08 MW 18.08 MW
920042 AA2-088 E OP Adder 15.56 MW 13.23 MW
934521 AD1-076 C Adder 18.27 MW 15.53 MW
934522 AD1-076 E Adder 9.31 MW 7.92 MW
942931 AE2-313 C 50/50 64.15 MW 64.15 MW
942932 AE2-313 E 50/50 42.77 MW 42.77 MW
944011 AF1-069 C 50/50 23.39 MW 23.39 MW
944012 AF1-069 E 50/50 9.09 MW 9.09 MW
960081 AF2-299 C Adder 2.9 MW 2.46 MW
960082 AF2-299 E Adder 1.93 MW 1.64 MW
900672 V4-068 E Adder 0.52 MW 0.45 MW
940492 AE2-034 E Adder 4.62 MW 3.93 MW
941031 AE2-094 C 50/50 71.59 MW 71.59 MW
941032 AE2-094 E 50/50 32.06 MW 32.06 MW
946281 AF1-292 C Adder 2.22 MW 1.88 MW
946282 AF1-292 E Adder 1.48 MW 1.25 MW
957481 AF2-042 C 50/50 86.76 MW 86.76 MW
957482 AF2-042 E 50/50 57.84 MW 57.84 MW
957521 AF2-046 C Adder 23.15 MW 19.68 MW
957522 AF2-046 E Adder 11.7 MW 9.94 MW
314539 3UNCAMP Adder 8.99 MW 7.64 MW
916042 Z1-036 E Adder 43.37 MW 36.87 MW
938771 AE1-103 C Adder 4.34 MW 3.69 MW
938772 AE1-103 E Adder 5.99 MW 5.09 MW
314507 3THOMPSN Adder 3.06 MW 2.6 MW
314525 6KINGFORK Adder 1.48 MW 1.26 MW
314550 6HICKORY 50/50 3.34 MW 3.34 MW
926662 AC1-147 E Adder 2.01 MW 1.71 MW
926755 AC1-161 E 50/50 20.56 MW 20.56 MW
935112 AD1-144 E Adder 1.38 MW 1.17 MW
942341 AE2-247 C Adder 2.12 MW 1.8 MW
942342 AE2-247 E Adder 2.93 MW 2.49 MW
943461 AF1-017 C Adder 1.92 MW 1.63 MW
943462 AF1-017 E Adder 3.13 MW 2.66 MW
943612 AF1-032 E Adder 1.4 MW 1.19 MW
944871 AF1-152 C Adder 8.01 MW 6.81 MW
944872 AF1-152 E Adder 5.34 MW 4.54 MW
315102 1BRUNSWICKG1 50/50 13.5 MW 13.5 MW
315103 1BRUNSWICKG2 50/50 13.5 MW 13.5 MW
315104 1BRUNSWICKG3 50/50 13.5 MW 13.5 MW
315105 1BRUNSWICKS1 50/50 28.06 MW 28.06 MW
315108 1ELIZAR1 50/50 4.52 MW 4.52 MW
315109 1ELIZAR2 50/50 4.44 MW 4.44 MW
315110 1ELIZAR3 50/50 4.58 MW 4.58 MW
315241 1Z1-086 GT1 50/50 17.35 MW 17.35 MW
315242 1Z1-086 GT2 50/50 17.34 MW 17.34 MW
315243 1Z1-086 GT3 50/50 17.34 MW 17.34 MW
315244 1Z1-086 ST 50/50 30.19 MW 30.19 MW
315260 1GOSPORTA Adder 3.23 MW 2.75 MW
315261 1GOSPORTB Adder 4.13 MW 3.51 MW
315262 1GOSPORTC Adder 3.51 MW 2.98 MW
913392 Y1-086 E Adder 3.35 MW 2.85 MW
916192 Z1-068 E 50/50 2.87 MW 2.87 MW
923832 AB2-022 E Adder 1.89 MW 1.61 MW
923852 AB2-025 E 50/50 1.73 MW 1.73 MW
957492 AF2-043 E Adder 2.16 MW 1.83 MW
901082 W1-029 E Adder 48.35 MW 41.09 MW
917122 Z2-027 E Adder 2.04 MW 1.74 MW
925522 AC1-027 E 50/50 1.86 MW 1.86 MW
941501 AE2-147 C Adder 24.04 MW 20.43 MW
941502 AE2-147 E Adder 16.03 MW 13.62 MW
957871 AF2-081 C 50/50 15.29 MW 15.29 MW
957872 AF2-081 E 50/50 6.55 MW 6.55 MW
958161 AF2-110 C Adder 2.04 MW 1.73 MW
958162 AF2-110 E Adder 3.24 MW 2.75 MW
933291 AC2-141 C 50/50 48.17 MW 48.17 MW
933292 AC2-141 E 50/50 20.56 MW 20.56 MW
939411 AE1-173 C 50/50 158.07 MW 158.07 MW
939412 AE1-173 E 50/50 105.38 MW 105.38 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
933981 AD1-022 C Adder 13.05 MW 11.09 MW
933982 AD1-022 E Adder 7.1 MW 6.04 MW
961681 AG1-008 C Adder 23.15 MW 19.68 MW
961682 AG1-008 E Adder 11.7 MW 9.94 MW
314594 6PLYMOUTH TP Adder 0.48 MW 0.41 MW
314632 6AYDLETT TAP 50/50 2.07 MW 2.07 MW
316185 AD1-033 C 50/50 1.75 MW 1.75 MW
316294 AC1-161 C 50/50 7.29 MW 7.29 MW
316315 AB2-025 C 50/50 0.56 MW 0.56 MW
316316 AC1-027 C 50/50 0.45 MW 0.45 MW
924516 AB2-100 E1 Adder 4.24 MW 3.6 MW
924517 AB2-100 E2 Adder 4.24 MW 3.6 MW
934065 AD1-033 E 50/50 7.69 MW 7.69 MW
937226 AE2-253 E 50/50 8.95 MW 8.95 MW
918512 AA1-065 E OP Adder 8.18 MW 6.95 MW
316017 AA1-139 ULT1 50/50 1.53 MW 1.53 MW
316018 AA1-139 ULT2 50/50 1.53 MW 1.53 MW
919153 AA1-139 E2 50/50 6.25 MW 6.25 MW
919152 AA1-139 E1 50/50 6.25 MW 6.25 MW
920692 AA2-178 E Adder 6.17 MW 5.24 MW
932046 AC2-012 E Adder 19.9 MW 16.91 MW
316311 AC2-079 C Adder 8.2 MW 6.97 MW
932596 AC2-079 E Adder 13.38 MW 11.38 MW
316349 AD2-085 C Adder 4.89 MW 4.16 MW
936666 AD2-085 E Adder 7.98 MW 6.79 MW
316388 AE2-253 GEN 50/50 2.79 MW 2.79 MW
941591 AE2-156 C Adder 27.22 MW 23.14 MW
944581 AF1-123 C 50/50 70.67 MW 70.67 MW
944582 AF1-123 E 50/50 161.82 MW 161.82 MW
944591 AF1-124 C 50/50 70.92 MW 70.92 MW
944592 AF1-124 E 50/50 162.41 MW 162.41 MW
944601 AF1-125 C 50/50 69.58 MW 69.58 MW
944602 AF1-125 E 50/50 159.29 MW 159.29 MW
965691 AG1-437 C Adder 15.06 MW 12.8 MW
965692 AG1-437 E Adder 10.04 MW 8.53 MW
965701 AG1-438 C Adder 15.06 MW 12.8 MW
965702 AG1-438 E Adder 10.04 MW 8.53 MW
965741 AG1-442 C Adder 8.78 MW 7.47 MW
965751 AG1-443 C Adder 8.78 MW 7.47 MW
965811 AG1-449 C 50/50 41.54 MW 41.54 MW
934501 AD1-074 C Adder 50.3 MW 42.76 MW
934502 AD1-074 E Adder 25.61 MW 21.77 MW
934511 AD1-075 C Adder 12.58 MW 10.69 MW
934512 AD1-075 E Adder 6.4 MW 5.44 MW
934611 AD1-087 C 50/50 1.8 MW 1.8 MW
934612 AD1-087 E 50/50 5.59 MW 5.59 MW
935172 AD1-152 E Adder 8.2 MW 6.97 MW
937481 AD2-202 C 50/50 0.52 MW 0.52 MW
937482 AD2-202 E 50/50 1.64 MW 1.64 MW
938531 AE1-072 C 50/50 26.86 MW 26.86 MW
938532 AE1-072 E 50/50 14.0 MW 14.0 MW
940481 AE2-033 C Adder 24.05 MW 20.45 MW
940482 AE2-033 E Adder 16.22 MW 13.78 MW
940541 AE2-040 C 50/50 4.28 MW 4.28 MW
940641 AE2-051 C 50/50 31.24 MW 31.24 MW
940642 AE2-051 E 50/50 20.83 MW 20.83 MW
941101 AE2-104 C Adder 4.99 MW 4.25 MW
941102 AE2-104 E Adder 7.94 MW 6.75 MW
941281 AE2-122 C 50/50 43.46 MW 43.46 MW
941282 AE2-122 E 50/50 175.38 MW 175.38 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 53.66 MW 53.66 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 35.8 MW 35.8 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 143.21 MW 143.21 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.73 MW 5.73 MW
NY PJM->LTFIMP_NY CLTF 2.63 MW 2.63 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.13 MW 2.13 MW
WEC LTFEXP_WEC->PJM CLTF 1.11 MW 1.11 MW
CPLE LTFEXP_CPLE->PJM CLTF 17.0 MW 17.0 MW
TVA LTFEXP_TVA->PJM CLTF 9.52 MW 9.52 MW
MEC LTFEXP_MEC->PJM CLTF 6.51 MW 6.51 MW
LAGN LTFEXP_LAGN->PJM CLTF 12.04 MW 12.04 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.41 MW 0.41 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.46 MW 36.46 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.11 MW 8.11 MW

Details for 6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H4T567_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer
314214 to 314903 ckt 1
DVP_P4-2: H4T567_SRT-A
CONTINGENCY 'DVP_P4-2: H4T567_SRT-A'
 OPEN BRANCH FROM BUS 314214 TO BUS 314903 CKT 2   /*6CHCKAHM     230.0 - 8CHCKAHM     500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Breaker AC 115.67 1107.1 C 1280.58 91.35
Elimination
Base Case Details for Eliminated Flowgate 6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H4T567_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314541 3WATKINS Adder 0.38 MW 0.32 MW
934521 AD1-076 C Adder 6.61 MW 5.62 MW
934522 AD1-076 E Adder 3.37 MW 2.87 MW
940492 AE2-034 E Adder 1.71 MW 1.46 MW
314539 3UNCAMP Adder 3.42 MW 2.9 MW
916042 Z1-036 E Adder 16.69 MW 14.19 MW
938771 AE1-103 C Adder 1.67 MW 1.42 MW
938772 AE1-103 E Adder 2.3 MW 1.96 MW
314184 3SHACKLE 50/50 0.56 MW 0.56 MW
314331 6POE Adder 0.74 MW 0.63 MW
314507 3THOMPSN Adder 1.26 MW 1.07 MW
314525 6KINGFORK Adder 0.66 MW 0.56 MW
314550 6HICKORY Adder 1.33 MW 1.13 MW
315060 1CHESTF5 Adder 62.52 MW 53.14 MW
315065 1CHESTF6 Adder 11.43 MW 9.72 MW
315073 1STONECA Adder 5.25 MW 4.46 MW
315083 1SPRUNCA Adder 4.78 MW 4.06 MW
315084 1SPRUNCB Adder 4.78 MW 4.06 MW
315092 1YORKTN3 Adder 121.42 MW 103.2 MW
925865 AC1-065 E 50/50 19.07 MW 19.07 MW
926412 AC1-112 E Adder 0.97 MW 0.82 MW
926472 AC1-118 E Adder 1.07 MW 0.91 MW
926662 AC1-147 E Adder 0.83 MW 0.7 MW
926755 AC1-161 E Adder 7.86 MW 6.68 MW
927226 AC1-216 E Adder 5.69 MW 4.84 MW
934392 AD1-063 E 50/50 1.29 MW 1.29 MW
935112 AD1-144 E Adder 0.61 MW 0.52 MW
936582 AD2-073 E Adder 1.14 MW 0.97 MW
936591 AD2-074 C 50/50 6.29 MW 6.29 MW
936592 AD2-074 E 50/50 10.27 MW 10.27 MW
942152 AE2-227 E Adder 1.12 MW 0.95 MW
942162 AE2-228 E Adder 0.83 MW 0.71 MW
942341 AE2-247 C Adder 0.91 MW 0.77 MW
942342 AE2-247 E Adder 1.25 MW 1.06 MW
943461 AF1-017 C Adder 0.82 MW 0.7 MW
943462 AF1-017 E Adder 1.34 MW 1.14 MW
943612 AF1-032 E Adder 0.57 MW 0.48 MW
943741 AF1-042 C 50/50 3.29 MW 3.29 MW
943742 AF1-042 E 50/50 5.37 MW 5.37 MW
944491 AF1-114 C Adder 4.97 MW 4.22 MW
944492 AF1-114 E Adder 6.86 MW 5.83 MW
944871 AF1-152 C Adder 3.15 MW 2.68 MW
944872 AF1-152 E Adder 2.1 MW 1.78 MW
961951 AG1-038 C 50/50 3.64 MW 3.64 MW
961952 AG1-038 E 50/50 5.03 MW 5.03 MW
966661 AG1-536 C 50/50 6.08 MW 6.08 MW
966662 AG1-536 E 50/50 8.18 MW 8.18 MW
315260 1GOSPORTA Adder 1.33 MW 1.13 MW
315261 1GOSPORTB Adder 1.7 MW 1.44 MW
315262 1GOSPORTC Adder 1.44 MW 1.22 MW
316075 AC2-137 C 50/50 0.42 MW 0.42 MW
316076 AC2-137 E 50/50 1.6 MW 1.6 MW
316078 AC2-138 E Adder 1.04 MW 0.89 MW
316156 AD2-030 C 50/50 0.4 MW 0.4 MW
316157 AD2-030 E 50/50 1.34 MW 1.34 MW
913392 Y1-086 E Adder 1.32 MW 1.12 MW
916192 Z1-068 E Adder 1.16 MW 0.99 MW
923832 AB2-022 E Adder 0.75 MW 0.63 MW
923842 AB2-024 E 50/50 2.24 MW 2.24 MW
930122 AB1-027 E Adder 1.19 MW 1.01 MW
939312 AE1-162 E Adder 0.98 MW 0.83 MW
946262 AF1-291 E Adder 0.83 MW 0.71 MW
957492 AF2-043 E Adder 0.87 MW 0.74 MW
957601 AF2-054 C 50/50 2.39 MW 2.39 MW
957602 AF2-054 E 50/50 1.59 MW 1.59 MW
962861 AG1-135 C 50/50 6.87 MW 6.87 MW
962862 AG1-135 E 50/50 4.58 MW 4.58 MW
962962 AG1-145 E 50/50 1.55 MW 1.55 MW
962971 AG1-146 C 50/50 3.49 MW 3.49 MW
962972 AG1-146 E 50/50 2.33 MW 2.33 MW
962981 AG1-147 C 50/50 8.14 MW 8.14 MW
962982 AG1-147 E 50/50 5.43 MW 5.43 MW
963611 AG1-210 C Adder 0.74 MW 0.63 MW
963612 AG1-210 E Adder 1.12 MW 0.95 MW
964211 AG1-282 C 50/50 2.33 MW 2.33 MW
964212 AG1-282 E 50/50 1.55 MW 1.55 MW
901082 W1-029 E Adder 19.0 MW 16.15 MW
917122 Z2-027 E Adder 0.8 MW 0.68 MW
925332 AB2-190 E Adder 6.02 MW 5.12 MW
925522 AC1-027 E Adder 0.75 MW 0.64 MW
941501 AE2-147 C Adder 9.45 MW 8.03 MW
941502 AE2-147 E Adder 6.3 MW 5.35 MW
942001 AE2-212 C Adder 1.22 MW 1.04 MW
942002 AE2-212 E Adder 0.81 MW 0.69 MW
957832 AF2-077 E Adder 1.41 MW 1.2 MW
957871 AF2-081 C Adder 6.07 MW 5.16 MW
957872 AF2-081 E Adder 2.6 MW 2.21 MW
957971 AF2-091 C Adder 1.69 MW 1.44 MW
957972 AF2-091 E Adder 2.33 MW 1.98 MW
958161 AF2-110 C Adder 0.83 MW 0.71 MW
958162 AF2-110 E Adder 1.32 MW 1.12 MW
313811 6ELKO L286 50/50 1.67 MW 1.67 MW
314181 3NORNECK Adder 0.99 MW 0.84 MW
933291 AC2-141 C Adder 18.41 MW 15.65 MW
933292 AC2-141 E Adder 7.86 MW 6.68 MW
939411 AE1-173 C Adder 44.09 MW 37.47 MW
939412 AE1-173 E Adder 29.39 MW 24.98 MW
934011 AD1-025 C Adder 12.44 MW 10.57 MW
934012 AD1-025 E Adder 7.37 MW 6.26 MW
933981 AD1-022 C Adder 4.12 MW 3.5 MW
313053 6PAPERMILL 50/50 8.23 MW 8.23 MW
314594 6PLYMOUTH TP Adder 0.18 MW 0.15 MW
314632 6AYDLETT TAP Adder 0.82 MW 0.7 MW
316059 AD1-063 C 50/50 0.29 MW 0.29 MW
316159 AE1-175 C 50/50 0.39 MW 0.39 MW
316160 AE1-175 E 50/50 1.28 MW 1.28 MW
316169 AC1-164 GEN 50/50 9.09 MW 9.09 MW
316240 AF1-291 C Adder 1.25 MW 1.06 MW
316301 AE2-228 C Adder 1.25 MW 1.06 MW
316304 AE2-227 C Adder 1.68 MW 1.43 MW
316314 AB2-024 C 50/50 0.34 MW 0.34 MW
316382 AG1-145 C 50/50 0.35 MW 0.35 MW
926785 AC1-164_E 50/50 26.97 MW 26.97 MW
934065 AD1-033 E Adder 3.07 MW 2.61 MW
937226 AE2-253 E Adder 3.56 MW 3.02 MW
939611 AE1-191 C 50/50 1.45 MW 1.45 MW
939612 AE1-191 E 50/50 6.48 MW 6.48 MW
963221 AG1-171 C Adder 1.58 MW 1.35 MW
963222 AG1-171 E Adder 1.06 MW 0.9 MW
963231 AG1-172 C Adder 1.58 MW 1.35 MW
963232 AG1-172 E Adder 1.06 MW 0.9 MW
963241 AG1-173 C Adder 1.58 MW 1.35 MW
963242 AG1-173 E Adder 1.06 MW 0.9 MW
316201 AC1-065 C 50/50 1.73 MW 1.73 MW
316404 AE1-155 C 50/50 2.23 MW 2.23 MW
939246 AE1-155 E 50/50 9.85 MW 9.85 MW
919153 AA1-139 E2 Adder 2.48 MW 2.11 MW
919152 AA1-139 E1 Adder 2.48 MW 2.11 MW
920692 AA2-178 E Adder 2.29 MW 1.94 MW
924814 AB2-134 E Adder 9.32 MW 7.93 MW
316084 AB2-161 E Adder 3.36 MW 2.86 MW
932046 AC2-012 E Adder 8.17 MW 6.94 MW
316311 AC2-079 C Adder 3.48 MW 2.96 MW
932596 AC2-079 E Adder 5.69 MW 4.83 MW
316280 AD1-041 C 50/50 0.92 MW 0.92 MW
934146 AD1-041 E 50/50 4.05 MW 4.05 MW
934576 AD1-082 E Adder 2.68 MW 2.28 MW
316349 AD2-085 C Adder 2.09 MW 1.78 MW
936666 AD2-085 E Adder 3.41 MW 2.9 MW
961611 AG1-000B C Adder 11.51 MW 9.78 MW
941591 AE2-156 C Adder 11.15 MW 9.48 MW
942371 AE2-250 C Adder 6.09 MW 5.17 MW
942372 AE2-250 E Adder 3.21 MW 2.73 MW
944581 AF1-123 C Adder 27.67 MW 23.52 MW
944582 AF1-123 E Adder 63.35 MW 53.85 MW
944591 AF1-124 C Adder 27.76 MW 23.6 MW
944592 AF1-124 E Adder 63.58 MW 54.05 MW
944601 AF1-125 C Adder 27.24 MW 23.16 MW
944602 AF1-125 E Adder 62.36 MW 53.01 MW
944631 AF1-128 C Adder 39.12 MW 33.25 MW
958261 AF2-120 C 50/50 7.07 MW 7.07 MW
958262 AF2-120 E 50/50 4.72 MW 4.72 MW
962271 AG1-075 C Adder 10.5 MW 8.93 MW
962272 AG1-075 E Adder 6.4 MW 5.44 MW
965281 AG1-393 C Adder 1.35 MW 1.15 MW
965282 AG1-393 E Adder 0.9 MW 0.77 MW
934501 AD1-074 C Adder 18.21 MW 15.48 MW
934502 AD1-074 E Adder 9.27 MW 7.88 MW
934511 AD1-075 C Adder 4.55 MW 3.87 MW
934512 AD1-075 E Adder 2.32 MW 1.97 MW
935161 AD1-151 C Adder 11.97 MW 10.18 MW
935162 AD1-151 E Adder 7.98 MW 6.79 MW
938531 AE1-072 C Adder 10.66 MW 9.06 MW
938532 AE1-072 E Adder 5.56 MW 4.72 MW
939191 AE1-149 C Adder 6.53 MW 5.55 MW
939192 AE1-149 E Adder 4.35 MW 3.7 MW
939601 AE1-190 C 50/50 0.36 MW 0.36 MW
939602 AE1-190 E 50/50 1.62 MW 1.62 MW
940431 AE2-027 C Adder 8.25 MW 7.01 MW
940432 AE2-027 E Adder 5.5 MW 4.67 MW
940551 AE2-041 C 50/50 8.61 MW 8.61 MW
941101 AE2-104 C Adder 2.04 MW 1.73 MW
941102 AE2-104 E Adder 3.24 MW 2.75 MW
941281 AE2-122 C Adder 17.56 MW 14.92 MW
941282 AE2-122 E Adder 70.85 MW 60.22 MW
943471 AF1-018 C 50/50 8.61 MW 8.61 MW
944641 AF1-129 C Adder 59.61 MW 50.67 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 3.32 MW 3.32 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 5.01 MW 5.01 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 31.56 MW 31.56 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.34 MW 1.34 MW
NY PJM->LTFIMP_NY CLTF 0.66 MW 0.66 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.16 MW 0.16 MW
WEC LTFEXP_WEC->PJM CLTF 0.08 MW 0.08 MW
CPLE LTFEXP_CPLE->PJM CLTF 4.06 MW 4.06 MW
TVA LTFEXP_TVA->PJM CLTF 1.53 MW 1.53 MW
MEC LTFEXP_MEC->PJM CLTF 0.67 MW 0.67 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.98 MW 1.98 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.04 MW 0.04 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 8.57 MW 8.57 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.93 MW 1.93 MW

Details for 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 155.32 663.64 B 1030.78 15.16
Elimination
Base Case Details for Eliminated Flowgate 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.35 MW 0.3 MW
961941 AG1-037 C Adder 0.2 MW 0.17 MW
962331 AG1-082 C Adder 0.78 MW 0.67 MW
962341 AG1-083 C Adder 0.78 MW 0.67 MW
963041 AG1-153 C 80/20 2.04 MW 2.04 MW
964801 AG1-343 C Adder 2.36 MW 2.01 MW
966801 AG1-551 C Adder 0.78 MW 0.66 MW
966811 AG1-552 C 80/20 0.83 MW 0.83 MW
965291 AG1-394 C Adder 0.34 MW 0.29 MW
966621 AG1-532 C 80/20 0.63 MW 0.63 MW
313506 AB1-173 C OP 80/20 0.45 MW 0.45 MW
314704 3LAWRENC 80/20 0.11 MW 0.11 MW
315126 1ROARAP2 80/20 0.52 MW 0.52 MW
315128 1ROARAP4 80/20 0.49 MW 0.49 MW
315131 1EDGECMA Adder 5.78 MW 4.92 MW
315136 1ROSEMG1 80/20 0.82 MW 0.82 MW
315137 1ROSEMS1 80/20 0.51 MW 0.51 MW
315138 1ROSEMG2 80/20 0.39 MW 0.39 MW
315139 1GASTONA 80/20 1.25 MW 1.25 MW
934521 AD1-076 C Adder 4.52 MW 3.84 MW
942931 AE2-313 C 80/20 13.26 MW 13.26 MW
944011 AF1-069 C 80/20 4.84 MW 4.84 MW
960081 AF2-299 C 80/20 0.91 MW 0.91 MW
941031 AE2-094 C 80/20 14.82 MW 14.82 MW
946281 AF1-292 C 80/20 0.7 MW 0.7 MW
957481 AF2-042 C Adder 17.75 MW 15.09 MW
957521 AF2-046 C Adder 6.18 MW 5.25 MW
957861 AF2-080 C Adder 2.82 MW 2.4 MW
938771 AE1-103 C 80/20 1.15 MW 1.15 MW
314507 3THOMPSN Adder 0.7 MW 0.6 MW
315065 1CHESTF6 80/20 26.23 MW 26.23 MW
315073 1STONECA 80/20 4.77 MW 4.77 MW
315076 1HOPPOLC 80/20 0.98 MW 0.98 MW
315077 1HOPHCF1 80/20 1.56 MW 1.56 MW
315078 1HOPHCF2 80/20 1.56 MW 1.56 MW
315079 1HOPHCF3 80/20 1.56 MW 1.56 MW
315080 1HOPHCF4 80/20 2.37 MW 2.37 MW
942341 AE2-247 C 80/20 0.71 MW 0.71 MW
943461 AF1-017 C 80/20 0.64 MW 0.64 MW
944871 AF1-152 C Adder 1.86 MW 1.58 MW
315102 1BRUNSWICKG1 80/20 2.8 MW 2.8 MW
315103 1BRUNSWICKG2 80/20 2.8 MW 2.8 MW
315104 1BRUNSWICKG3 80/20 2.8 MW 2.8 MW
315105 1BRUNSWICKS1 80/20 5.82 MW 5.82 MW
315116 1SURRY 1 80/20 10.19 MW 10.19 MW
315117 1GRAVELC 80/20 0.36 MW 0.36 MW
315119 1GRAVEL3 80/20 1.04 MW 1.04 MW
315120 1GRAVEL4 80/20 1.05 MW 1.05 MW
315121 1GRAVEL5 80/20 1.04 MW 1.04 MW
315122 1GRAVEL6 80/20 1.05 MW 1.05 MW
315141 1GASTONB 80/20 1.25 MW 1.25 MW
315241 1Z1-086 GT1 80/20 3.59 MW 3.59 MW
315242 1Z1-086 GT2 80/20 3.59 MW 3.59 MW
315243 1Z1-086 GT3 80/20 3.59 MW 3.59 MW
315244 1Z1-086 ST 80/20 6.25 MW 6.25 MW
315260 1GOSPORTA Adder 0.74 MW 0.63 MW
315261 1GOSPORTB Adder 0.95 MW 0.81 MW
315262 1GOSPORTC Adder 0.81 MW 0.69 MW
316132 AB2-190 C 80/20 2.4 MW 2.4 MW
941501 AE2-147 C Adder 5.6 MW 4.76 MW
942001 AE2-212 C 80/20 2.35 MW 2.35 MW
957871 AF2-081 C Adder 3.43 MW 2.92 MW
958161 AF2-110 C 80/20 0.53 MW 0.53 MW
926071 AC1-086 C 80/20 9.28 MW 9.28 MW
927021 AC1-189 C Adder 3.11 MW 2.64 MW
939411 AE1-173 C 80/20 32.67 MW 32.67 MW
934011 AD1-025 C 80/20 9.39 MW 9.39 MW
933981 AD1-022 C Adder 3.26 MW 2.77 MW
960331 AF2-324 C Adder 2.6 MW 2.21 MW
961681 AG1-008 C Adder 6.18 MW 5.25 MW
962571 AG1-106 C 80/20 1.31 MW 1.31 MW
316011 AB1-132 C OP 80/20 0.95 MW 0.95 MW
316023 AB2-100 C2 80/20 0.44 MW 0.44 MW
316210 AC1-098 C Adder 2.37 MW 2.01 MW
316212 AC1-099 C Adder 0.79 MW 0.67 MW
316236 AE1-162 C 80/20 0.13 MW 0.13 MW
316240 AF1-291 C 80/20 2.78 MW 2.78 MW
316263 AC1-034 C Adder 2.46 MW 2.1 MW
316274 AC1-208 C Adder 3.5 MW 2.98 MW
316301 AE2-228 C 80/20 2.71 MW 2.71 MW
316315 AB2-025 C 80/20 0.22 MW 0.22 MW
316336 AC2-165 C Adder -3.15 MW -2.68 MW
316365 AB2-100 C1 80/20 0.44 MW 0.44 MW
316369 AC1-216 C 80/20 0.83 MW 0.83 MW
963221 AG1-171 C 80/20 1.2 MW 1.2 MW
963231 AG1-172 C 80/20 1.2 MW 1.2 MW
963241 AG1-173 C 80/20 1.2 MW 1.2 MW
316181 AB2-040 GEN 80/20 0.51 MW 0.51 MW
316033 AB2-134 GEN 80/20 1.08 MW 1.08 MW
316083 AB2-161 C 80/20 0.31 MW 0.31 MW
316087 AB2-174 C 80/20 0.48 MW 0.48 MW
316311 AC2-079 C 80/20 2.67 MW 2.67 MW
316381 AD1-082 C 80/20 0.71 MW 0.71 MW
316349 AD2-085 C 80/20 1.64 MW 1.64 MW
961611 AG1-000B C 80/20 7.56 MW 7.56 MW
941591 AE2-156 C Adder 6.23 MW 5.3 MW
942371 AE2-250 C 80/20 4.76 MW 4.76 MW
944581 AF1-123 C Adder 15.11 MW 12.84 MW
944591 AF1-124 C Adder 15.16 MW 12.89 MW
944601 AF1-125 C Adder 14.87 MW 12.64 MW
962271 AG1-075 C 80/20 8.21 MW 8.21 MW
965281 AG1-393 C 80/20 1.06 MW 1.06 MW
965601 AG1-428 C Adder 1.84 MW 1.56 MW
965691 AG1-437 C Adder 3.8 MW 3.23 MW
965701 AG1-438 C Adder 3.8 MW 3.23 MW
965711 AG1-439 C Adder 8.72 MW 7.41 MW
965741 AG1-442 C Adder 2.22 MW 1.89 MW
965751 AG1-443 C Adder 2.22 MW 1.89 MW
965761 AG1-444 C Adder 4.65 MW 3.95 MW
965811 AG1-449 C 80/20 8.59 MW 8.59 MW
313764 3SOCKMAN 80/20 0.3 MW 0.3 MW
932631 AC2-084 C Adder 2.53 MW 2.15 MW
934321 AD1-056 C Adder 2.52 MW 2.14 MW
934331 AD1-057 C Adder 1.4 MW 1.19 MW
934501 AD1-074 C Adder 12.44 MW 10.58 MW
934511 AD1-075 C Adder 3.11 MW 2.64 MW
935161 AD1-151 C 80/20 9.43 MW 9.43 MW
938531 AE1-072 C Adder 6.05 MW 5.14 MW
939191 AE1-149 C 80/20 7.55 MW 7.55 MW
940431 AE2-027 C 80/20 5.35 MW 5.35 MW
940481 AE2-033 C 80/20 9.24 MW 9.24 MW
940541 AE2-040 C 80/20 1.67 MW 1.67 MW
940641 AE2-051 C 80/20 6.35 MW 6.35 MW
941101 AE2-104 C 80/20 1.3 MW 1.3 MW
941281 AE2-122 C Adder 9.8 MW 8.33 MW
944641 AF1-129 C 80/20 136.78 MW 136.78 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 9.7 MW 9.7 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.98 MW 6.98 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 30.65 MW 30.65 MW
NY PJM->LTFIMP_NY CLTF 0.48 MW 0.48 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.39 MW 0.39 MW
WEC LTFEXP_WEC->PJM CLTF 0.2 MW 0.2 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.74 MW 3.74 MW
TVA LTFEXP_TVA->PJM CLTF 1.89 MW 1.89 MW
MEC LTFEXP_MEC->PJM CLTF 1.22 MW 1.22 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.41 MW 2.41 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.78 MW 1.78 MW

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

Summer Potential Congestion due to Local Energy Deliverability
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 269.76 678.68 B 1830.8 475.06
DVP 6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 164.07 678.68 B 1113.54 240.98
DVP 6FENTRES-6POCATY 230.0 kV Ckt 1 line
314466 to 316171 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 157.19 678.68 B 1066.84 241.17
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer
314218 to 314908 ckt 2
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 102.24 879.84 B 899.51 72.63
DVP 6THRASHER-6YADKIN 230.0 kV Ckt 1 line
314508 to 314514 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 136.38 818.74 B 1116.58 297.47
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 105.29 2858.0 B 3009.3 126.36
DVP 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 1 transformer
314909 to 314466 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 117.53 1115.59 B 1311.19 420.59
DVP 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 2 transformer
314909 to 314466 ckt 2
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 117.38 1103.28 B 1295.03 415.41
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 2 line
314902 to 314914 ckt 2
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 110.71 4094.64 B 4533.15 206.35
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P1: Carson-Midlothian_SRT-A
CONTINGENCY 'DVP_P1: Carson-Midlothian_SRT-A'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 2   /*8CARSON      500.0 - 8MDLTHAN     500.0
END
OP AC 110.71 4094.64 B 4533.15 206.35
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 2 line
314914 to 314918 ckt 2
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 104.42 4094.64 B 4275.43 205.95
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1: Midlothian-NorthAnna_SRT-A
CONTINGENCY 'DVP_P1: Midlothian-NorthAnna_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 2   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 104.42 4094.64 B 4275.43 205.95

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 269.76 678.68 B 1830.8 475.06
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 269.46 678.68 B 1828.76 474.83
Topology Case Flowgate Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
934521 AD1-076 C 50/50 8.2 MW 8.2 MW
934522 AD1-076 E 50/50 4.18 MW 4.18 MW
940491 AE2-034 C 50/50 0.92 MW 0.92 MW
940492 AE2-034 E 50/50 2.63 MW 2.63 MW
916042 Z1-036 E 50/50 33.3 MW 33.3 MW
313526 AB2-022 C 50/50 0.72 MW 0.72 MW
314550 6HICKORY 50/50 6.67 MW 6.67 MW
944871 AF1-152 C 50/50 6.03 MW 6.03 MW
944872 AF1-152 E 50/50 4.02 MW 4.02 MW
315605 6W1-029WIND 50/50 0.82 MW 0.82 MW
315611 6Z1-036WIND 50/50 0.71 MW 0.71 MW
913392 Y1-086 E 50/50 4.51 MW 4.51 MW
916192 Z1-068 E 50/50 1.19 MW 1.19 MW
923832 AB2-022 E 50/50 2.54 MW 2.54 MW
901082 W1-029 E 50/50 36.4 MW 36.4 MW
917122 Z2-027 E 50/50 2.41 MW 2.41 MW
925522 AC1-027 E 50/50 0.76 MW 0.76 MW
941501 AE2-147 C 50/50 18.1 MW 18.1 MW
941502 AE2-147 E 50/50 12.07 MW 12.07 MW
957871 AF2-081 C 50/50 27.4 MW 27.4 MW
957872 AF2-081 E 50/50 11.74 MW 11.74 MW
916191 Z1-068 C 50/50 0.03 MW 0.03 MW
933981 AD1-022 C Adder 4.97 MW 4.22 MW
933982 AD1-022 E Adder 2.7 MW 2.3 MW
314594 6PLYMOUTH TP 50/50 0.23 MW 0.23 MW
314632 6AYDLETT TAP 50/50 3.48 MW 3.48 MW
316185 AD1-033 C 50/50 3.17 MW 3.17 MW
316316 AC1-027 C 50/50 0.18 MW 0.18 MW
316320 Y1-086 C 50/50 0.42 MW 0.42 MW
316321 Z2-027 C 50/50 0.61 MW 0.61 MW
934065 AD1-033 E 50/50 13.91 MW 13.91 MW
937226 AE2-253 E 50/50 16.74 MW 16.74 MW
316017 AA1-139 ULT1 50/50 2.76 MW 2.76 MW
316018 AA1-139 ULT2 50/50 2.76 MW 2.76 MW
919153 AA1-139 E2 50/50 11.21 MW 11.21 MW
919152 AA1-139 E1 50/50 11.21 MW 11.21 MW
315614 AA2-178 C 50/50 1.25 MW 1.25 MW
920692 AA2-178 E 50/50 3.51 MW 3.51 MW
925122 AB2-169 E Adder 2.71 MW 2.31 MW
316388 AE2-253 GEN 50/50 5.23 MW 5.23 MW
944581 AF1-123 C 50/50 143.88 MW 143.88 MW
944582 AF1-123 E 50/50 329.47 MW 329.47 MW
944591 AF1-124 C 50/50 144.39 MW 144.39 MW
944592 AF1-124 E 50/50 330.66 MW 330.66 MW
944601 AF1-125 C 50/50 141.66 MW 141.66 MW
944602 AF1-125 E 50/50 324.3 MW 324.3 MW
965691 AG1-437 C Adder 4.91 MW 4.17 MW
965692 AG1-437 E Adder 3.27 MW 2.78 MW
965701 AG1-438 C Adder 4.91 MW 4.17 MW
965702 AG1-438 E Adder 3.27 MW 2.78 MW
965741 AG1-442 C Adder 2.86 MW 2.43 MW
965751 AG1-443 C Adder 2.86 MW 2.43 MW
934501 AD1-074 C 50/50 22.59 MW 22.59 MW
934502 AD1-074 E 50/50 11.5 MW 11.5 MW
934511 AD1-075 C 50/50 5.65 MW 5.65 MW
934512 AD1-075 E 50/50 2.88 MW 2.88 MW
938531 AE1-072 C 50/50 45.9 MW 45.9 MW
938532 AE1-072 E 50/50 23.93 MW 23.93 MW
941281 AE2-122 C 50/50 20.34 MW 20.34 MW
941282 AE2-122 E 50/50 82.07 MW 82.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.29 MW 1.29 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.04 MW 1.04 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 5.25 MW 5.25 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.18 MW 0.18 MW
NY PJM->LTFIMP_NY CLTF 0.08 MW 0.08 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.05 MW 0.05 MW
WEC LTFEXP_WEC->PJM CLTF 0.03 MW 0.03 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.73 MW 0.73 MW
TVA LTFEXP_TVA->PJM CLTF 0.29 MW 0.29 MW
MEC LTFEXP_MEC->PJM CLTF 0.17 MW 0.17 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.37 MW 0.37 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 1.13 MW 1.13 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.35 MW 0.35 MW

Details for 6POCATY-6LANDSTN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 164.07 678.68 B 1113.54 240.98
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 164.11 678.68 B 1113.78 240.87
Topology Case Flowgate Details for 6POCATY-6LANDSTN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
934521 AD1-076 C Adder 4.61 MW 3.92 MW
934522 AD1-076 E Adder 2.35 MW 2.0 MW
940492 AE2-034 E Adder 1.45 MW 1.23 MW
916042 Z1-036 E 50/50 17.98 MW 17.98 MW
313526 AB2-022 C 50/50 0.37 MW 0.37 MW
314507 3THOMPSN Adder -0.88 MW -0.75 MW
314550 6HICKORY 50/50 3.39 MW 3.39 MW
944871 AF1-152 C 50/50 3.29 MW 3.29 MW
944872 AF1-152 E 50/50 2.19 MW 2.19 MW
315605 6W1-029WIND 50/50 0.45 MW 0.45 MW
315611 6Z1-036WIND 50/50 0.38 MW 0.38 MW
913392 Y1-086 E 50/50 2.34 MW 2.34 MW
923832 AB2-022 E 50/50 1.32 MW 1.32 MW
901082 W1-029 E 50/50 19.82 MW 19.82 MW
917122 Z2-027 E 50/50 1.26 MW 1.26 MW
941501 AE2-147 C 50/50 9.86 MW 9.86 MW
941502 AE2-147 E 50/50 6.57 MW 6.57 MW
957871 AF2-081 C 50/50 13.99 MW 13.99 MW
957872 AF2-081 E 50/50 6.0 MW 6.0 MW
933981 AD1-022 C Adder 2.84 MW 2.42 MW
933982 AD1-022 E Adder 1.55 MW 1.32 MW
314594 6PLYMOUTH TP Adder 0.13 MW 0.11 MW
314632 6AYDLETT TAP 50/50 1.78 MW 1.78 MW
316185 AD1-033 C 50/50 2.34 MW 2.34 MW
316320 Y1-086 C 50/50 0.22 MW 0.22 MW
316321 Z2-027 C 50/50 0.32 MW 0.32 MW
934065 AD1-033 E 50/50 10.27 MW 10.27 MW
937226 AE2-253 E 50/50 8.53 MW 8.53 MW
316017 AA1-139 ULT1 50/50 1.41 MW 1.41 MW
316018 AA1-139 ULT2 50/50 1.41 MW 1.41 MW
919153 AA1-139 E2 50/50 5.72 MW 5.72 MW
919152 AA1-139 E1 50/50 5.72 MW 5.72 MW
920692 AA2-178 E Adder 1.94 MW 1.65 MW
316388 AE2-253 GEN 50/50 2.67 MW 2.67 MW
944581 AF1-123 C 50/50 72.99 MW 72.99 MW
944582 AF1-123 E 50/50 167.13 MW 167.13 MW
944591 AF1-124 C 50/50 73.25 MW 73.25 MW
944592 AF1-124 E 50/50 167.74 MW 167.74 MW
944601 AF1-125 C 50/50 71.86 MW 71.86 MW
944602 AF1-125 E 50/50 164.51 MW 164.51 MW
934501 AD1-074 C Adder 12.7 MW 10.79 MW
934502 AD1-074 E Adder 6.46 MW 5.49 MW
934511 AD1-075 C Adder 3.17 MW 2.7 MW
934512 AD1-075 E Adder 1.62 MW 1.37 MW
938531 AE1-072 C 50/50 23.48 MW 23.48 MW
938532 AE1-072 E 50/50 12.24 MW 12.24 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.08 MW 1.08 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.76 MW 0.76 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 3.48 MW 3.48 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.1 MW 0.1 MW
NY PJM->LTFIMP_NY CLTF 0.04 MW 0.04 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.04 MW 0.04 MW
WEC LTFEXP_WEC->PJM CLTF 0.02 MW 0.02 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.48 MW 0.48 MW
TVA LTFEXP_TVA->PJM CLTF 0.2 MW 0.2 MW
MEC LTFEXP_MEC->PJM CLTF 0.13 MW 0.13 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.26 MW 0.26 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.61 MW 0.61 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.23 MW 0.23 MW

Details for 6FENTRES-6POCATY 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6FENTRES-6POCATY 230.0 kV Ckt 1 line
314466 to 316171 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 157.19 678.68 B 1066.84 241.17
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 6FENTRES-6POCATY 230.0 kV Ckt 1 line
314466 to 316171 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 157.23 678.68 B 1067.07 241.05
Topology Case Flowgate Details for 6FENTRES-6POCATY 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
934521 AD1-076 C Adder 4.63 MW 3.93 MW
934522 AD1-076 E Adder 2.36 MW 2.0 MW
940492 AE2-034 E Adder 1.46 MW 1.24 MW
916042 Z1-036 E 50/50 18.02 MW 18.02 MW
313526 AB2-022 C 50/50 0.37 MW 0.37 MW
314507 3THOMPSN Adder -0.88 MW -0.75 MW
314550 6HICKORY 50/50 3.39 MW 3.39 MW
944871 AF1-152 C 50/50 3.29 MW 3.29 MW
944872 AF1-152 E 50/50 2.19 MW 2.19 MW
315605 6W1-029WIND 50/50 0.45 MW 0.45 MW
315611 6Z1-036WIND 50/50 0.38 MW 0.38 MW
913392 Y1-086 E 50/50 2.34 MW 2.34 MW
923832 AB2-022 E 50/50 1.32 MW 1.32 MW
901082 W1-029 E 50/50 19.86 MW 19.86 MW
917122 Z2-027 E 50/50 1.26 MW 1.26 MW
941501 AE2-147 C 50/50 9.88 MW 9.88 MW
941502 AE2-147 E 50/50 6.58 MW 6.58 MW
957871 AF2-081 C 50/50 14.0 MW 14.0 MW
957872 AF2-081 E 50/50 6.0 MW 6.0 MW
933981 AD1-022 C Adder 2.86 MW 2.43 MW
933982 AD1-022 E Adder 1.55 MW 1.32 MW
314594 6PLYMOUTH TP Adder 0.13 MW 0.11 MW
314632 6AYDLETT TAP 50/50 1.78 MW 1.78 MW
316320 Y1-086 C 50/50 0.22 MW 0.22 MW
316321 Z2-027 C 50/50 0.32 MW 0.32 MW
937226 AE2-253 E 50/50 8.54 MW 8.54 MW
316017 AA1-139 ULT1 50/50 1.41 MW 1.41 MW
316018 AA1-139 ULT2 50/50 1.41 MW 1.41 MW
919153 AA1-139 E2 50/50 5.72 MW 5.72 MW
919152 AA1-139 E1 50/50 5.72 MW 5.72 MW
920692 AA2-178 E Adder 1.94 MW 1.65 MW
316388 AE2-253 GEN 50/50 2.67 MW 2.67 MW
944581 AF1-123 C 50/50 73.04 MW 73.04 MW
944582 AF1-123 E 50/50 167.26 MW 167.26 MW
944591 AF1-124 C 50/50 73.3 MW 73.3 MW
944592 AF1-124 E 50/50 167.87 MW 167.87 MW
944601 AF1-125 C 50/50 71.92 MW 71.92 MW
944602 AF1-125 E 50/50 164.64 MW 164.64 MW
934501 AD1-074 C Adder 12.74 MW 10.83 MW
934502 AD1-074 E Adder 6.49 MW 5.51 MW
934511 AD1-075 C Adder 3.18 MW 2.71 MW
934512 AD1-075 E Adder 1.62 MW 1.38 MW
938531 AE1-072 C 50/50 23.5 MW 23.5 MW
938532 AE1-072 E 50/50 12.25 MW 12.25 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.46 MW 1.46 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.91 MW 0.91 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 3.71 MW 3.71 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.07 MW 0.07 MW
NY PJM->LTFIMP_NY CLTF 0.03 MW 0.03 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.06 MW 0.06 MW
WEC LTFEXP_WEC->PJM CLTF 0.03 MW 0.03 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.5 MW 0.5 MW
TVA LTFEXP_TVA->PJM CLTF 0.23 MW 0.23 MW
MEC LTFEXP_MEC->PJM CLTF 0.17 MW 0.17 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.3 MW 0.3 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.46 MW 0.46 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.24 MW 0.24 MW

Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer
314218 to 314908 ckt 2
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 102.24 879.84 B 899.51 72.63
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer
314218 to 314908 ckt 2
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 138.42 879.84 B 1217.85 91.41
Topology Case Flowgate Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer l/o DVP_P1-2: LN 557_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
964801 AG1-343 C Adder 2.59 MW 2.2 MW
964802 AG1-343 E Adder 2.03 MW 1.73 MW
965291 AG1-394 C Adder 0.37 MW 0.32 MW
965292 AG1-394 E Adder 0.68 MW 0.58 MW
314541 3WATKINS Adder 0.32 MW 0.27 MW
920042 AA2-088 E OP Adder 4.63 MW 3.94 MW
934521 AD1-076 C Adder 5.38 MW 4.58 MW
934522 AD1-076 E Adder 2.74 MW 2.33 MW
940492 AE2-034 E Adder 1.39 MW 1.18 MW
314539 3UNCAMP Adder 2.82 MW 2.4 MW
916042 Z1-036 E Adder 13.42 MW 11.41 MW
938771 AE1-103 C Adder 1.38 MW 1.17 MW
938772 AE1-103 E Adder 1.9 MW 1.62 MW
314229 6MT RD221 50/50 0.13 MW 0.13 MW
314236 6NRTHEST 50/50 0.16 MW 0.16 MW
314331 6POE Adder 0.8 MW 0.68 MW
314507 3THOMPSN Adder 1.0 MW 0.85 MW
314525 6KINGFORK Adder 0.52 MW 0.44 MW
314550 6HICKORY Adder 1.06 MW 0.9 MW
315050 1FOURRIVERG 50/50 4.16 MW 4.16 MW
315060 1CHESTF5 Adder 47.81 MW 40.64 MW
315065 1CHESTF6 Adder 14.5 MW 12.33 MW
315067 1DARBY 1 50/50 2.12 MW 2.12 MW
315068 1DARBY 2 50/50 2.13 MW 2.13 MW
315069 1DARBY 3 50/50 2.13 MW 2.13 MW
315070 1DARBY 4 50/50 2.14 MW 2.14 MW
315073 1STONECA Adder 4.88 MW 4.15 MW
315083 1SPRUNCA Adder 6.98 MW 5.93 MW
315084 1SPRUNCB Adder 6.98 MW 5.93 MW
315092 1YORKTN3 Adder 81.43 MW 69.22 MW
925865 AC1-065 E Adder 10.96 MW 9.32 MW
926412 AC1-112 E 50/50 1.07 MW 1.07 MW
926472 AC1-118 E Adder 0.6 MW 0.51 MW
926662 AC1-147 E Adder 0.66 MW 0.56 MW
926755 AC1-161 E Adder 6.2 MW 5.27 MW
927226 AC1-216 E Adder 4.95 MW 4.21 MW
934392 AD1-063 E Adder 0.7 MW 0.6 MW
934781 AD1-105 C 50/50 1.02 MW 1.02 MW
934782 AD1-105 E 50/50 4.56 MW 4.56 MW
935112 AD1-144 E Adder 0.48 MW 0.41 MW
936582 AD2-073 E Adder 0.64 MW 0.54 MW
936591 AD2-074 C Adder 3.53 MW 3.0 MW
936592 AD2-074 E Adder 5.76 MW 4.89 MW
942152 AE2-227 E Adder 1.18 MW 1.0 MW
942162 AE2-228 E Adder 1.03 MW 0.88 MW
942341 AE2-247 C Adder 0.78 MW 0.67 MW
942342 AE2-247 E Adder 1.08 MW 0.92 MW
943461 AF1-017 C Adder 0.71 MW 0.6 MW
943462 AF1-017 E Adder 1.16 MW 0.98 MW
943612 AF1-032 E Adder 0.45 MW 0.39 MW
943741 AF1-042 C Adder 1.85 MW 1.57 MW
943742 AF1-042 E Adder 3.01 MW 2.56 MW
944871 AF1-152 C Adder 2.52 MW 2.14 MW
944872 AF1-152 E Adder 1.68 MW 1.43 MW
958502 AF2-144 E Adder 0.51 MW 0.43 MW
960091 AF2-300 C Adder 1.11 MW 0.94 MW
960092 AF2-300 E Adder 0.74 MW 0.63 MW
961951 AG1-038 C Adder 2.04 MW 1.74 MW
961952 AG1-038 E Adder 2.82 MW 2.4 MW
966661 AG1-536 C Adder 3.4 MW 2.89 MW
966662 AG1-536 E Adder 4.56 MW 3.88 MW
966871 AG1-558 C 50/50 2.57 MW 2.57 MW
966872 AG1-558 E 50/50 1.3 MW 1.3 MW
966881 AG1-559 C Adder 1.23 MW 1.05 MW
966882 AG1-559 E Adder 0.62 MW 0.53 MW
315260 1GOSPORTA Adder 1.06 MW 0.9 MW
315261 1GOSPORTB Adder 1.35 MW 1.15 MW
315262 1GOSPORTC Adder 1.15 MW 0.98 MW
316076 AC2-137 E Adder 1.05 MW 0.9 MW
316078 AC2-138 E Adder 0.58 MW 0.49 MW
316157 AD2-030 E Adder 0.76 MW 0.65 MW
913392 Y1-086 E Adder 1.06 MW 0.9 MW
916192 Z1-068 E Adder 0.93 MW 0.79 MW
923832 AB2-022 E Adder 0.6 MW 0.51 MW
923842 AB2-024 E Adder 1.2 MW 1.02 MW
923852 AB2-025 E Adder 0.52 MW 0.44 MW
923862 AB2-026 E Adder 0.52 MW 0.44 MW
930122 AB1-027 E 50/50 1.31 MW 1.31 MW
938552 AE1-074 E Adder 0.83 MW 0.7 MW
938562 AE1-075 E Adder 0.44 MW 0.37 MW
939312 AE1-162 E Adder 0.79 MW 0.67 MW
946262 AF1-291 E Adder 1.04 MW 0.88 MW
957411 AF2-035 C Adder 4.45 MW 3.78 MW
957412 AF2-035 E Adder 2.22 MW 1.89 MW
957492 AF2-043 E Adder 0.7 MW 0.59 MW
957601 AF2-054 C Adder 1.36 MW 1.16 MW
957602 AF2-054 E Adder 0.91 MW 0.77 MW
962861 AG1-135 C Adder 3.84 MW 3.26 MW
962862 AG1-135 E Adder 2.56 MW 2.17 MW
962962 AG1-145 E Adder 0.9 MW 0.77 MW
962971 AG1-146 C Adder 1.96 MW 1.67 MW
962972 AG1-146 E Adder 1.31 MW 1.11 MW
962981 AG1-147 C Adder 4.58 MW 3.89 MW
962982 AG1-147 E Adder 3.05 MW 2.6 MW
963611 AG1-210 C Adder 0.41 MW 0.35 MW
963612 AG1-210 E Adder 0.62 MW 0.53 MW
964211 AG1-282 C Adder 1.27 MW 1.08 MW
964212 AG1-282 E Adder 0.85 MW 0.72 MW
901082 W1-029 E Adder 15.21 MW 12.93 MW
917122 Z2-027 E Adder 0.64 MW 0.55 MW
925332 AB2-190 E Adder 5.38 MW 4.58 MW
925522 AC1-027 E Adder 0.6 MW 0.51 MW
941501 AE2-147 C Adder 7.56 MW 6.43 MW
941502 AE2-147 E Adder 5.04 MW 4.29 MW
942001 AE2-212 C Adder 1.45 MW 1.23 MW
942002 AE2-212 E Adder 0.96 MW 0.82 MW
957832 AF2-077 E Adder 0.87 MW 0.74 MW
957871 AF2-081 C Adder 4.84 MW 4.12 MW
957872 AF2-081 E Adder 2.08 MW 1.76 MW
958161 AF2-110 C Adder 0.68 MW 0.58 MW
958162 AF2-110 E Adder 1.08 MW 0.92 MW
313811 6ELKO L286 Adder 1.1 MW 0.93 MW
314181 3NORNECK Adder 0.55 MW 0.47 MW
933291 AC2-141 C Adder 14.53 MW 12.35 MW
933292 AC2-141 E Adder 6.2 MW 5.27 MW
934011 AD1-025 C Adder 10.82 MW 9.2 MW
934012 AD1-025 E Adder 6.41 MW 5.45 MW
927041 AC1-191 C 50/50 10.33 MW 10.33 MW
927042 AC1-191 E 50/50 5.15 MW 5.15 MW
933981 AD1-022 C Adder 3.82 MW 3.25 MW
933982 AD1-022 E Adder 2.08 MW 1.77 MW
313053 6PAPERMILL Adder 4.41 MW 3.75 MW
314594 6PLYMOUTH TP Adder 0.14 MW 0.12 MW
314632 6AYDLETT TAP Adder 0.66 MW 0.56 MW
316004 AC1-112 C 50/50 0.29 MW 0.29 MW
316160 AE1-175 E Adder 0.75 MW 0.63 MW
316233 AE1-074 C Adder 1.64 MW 1.39 MW
316240 AF1-291 C Adder 1.56 MW 1.33 MW
316301 AE2-228 C Adder 1.55 MW 1.32 MW
316304 AE2-227 C Adder 1.76 MW 1.5 MW
316312 AB1-027 C 50/50 0.47 MW 0.47 MW
924516 AB2-100 E1 Adder 1.22 MW 1.04 MW
924517 AB2-100 E2 Adder 1.22 MW 1.04 MW
926785 AC1-164_E Adder 13.15 MW 11.17 MW
934065 AD1-033 E Adder 2.45 MW 2.08 MW
937226 AE2-253 E Adder 2.84 MW 2.41 MW
939612 AE1-191 E Adder 3.71 MW 3.15 MW
963221 AG1-171 C Adder 1.38 MW 1.17 MW
963222 AG1-171 E Adder 0.92 MW 0.78 MW
963231 AG1-172 C Adder 1.38 MW 1.17 MW
963232 AG1-172 E Adder 0.92 MW 0.78 MW
963241 AG1-173 C Adder 1.38 MW 1.17 MW
963242 AG1-173 E Adder 0.92 MW 0.78 MW
315051 AA1-145 CT1 50/50 4.29 MW 4.29 MW
315052 AA1-145 CT2 50/50 4.29 MW 4.29 MW
316427 AG1-213 C Adder 0.37 MW 0.32 MW
939246 AE1-155 E Adder 5.5 MW 4.67 MW
315043 1FOUR RIVERA 50/50 2.69 MW 2.69 MW
315044 1FOUR RIVERB 50/50 2.69 MW 2.69 MW
315045 1FOUR RIVERC 50/50 3.29 MW 3.29 MW
315046 1FOUR RIVERD 50/50 2.65 MW 2.65 MW
315047 1FOUR RIVERE 50/50 2.65 MW 2.65 MW
315048 1FOUR RIVERF 50/50 3.24 MW 3.24 MW
919153 AA1-139 E2 Adder 1.98 MW 1.68 MW
919152 AA1-139 E1 Adder 1.98 MW 1.68 MW
920692 AA2-178 E Adder 1.85 MW 1.57 MW
924814 AB2-134 E Adder 8.11 MW 6.89 MW
316084 AB2-161 E Adder 3.16 MW 2.69 MW
932046 AC2-012 E Adder 6.52 MW 5.54 MW
316311 AC2-079 C Adder 3.0 MW 2.55 MW
932596 AC2-079 E Adder 4.89 MW 4.15 MW
934146 AD1-041 E Adder 2.32 MW 1.97 MW
934576 AD1-082 E Adder 2.52 MW 2.14 MW
316349 AD2-085 C Adder 1.81 MW 1.54 MW
936666 AD2-085 E Adder 2.95 MW 2.51 MW
961611 AG1-000B C Adder 9.57 MW 8.13 MW
941591 AE2-156 C Adder 8.9 MW 7.57 MW
942371 AE2-250 C Adder 6.66 MW 5.66 MW
942372 AE2-250 E Adder 3.51 MW 2.99 MW
944581 AF1-123 C Adder 22.0 MW 18.7 MW
944582 AF1-123 E Adder 50.37 MW 42.82 MW
944591 AF1-124 C Adder 22.08 MW 18.77 MW
944592 AF1-124 E Adder 50.56 MW 42.97 MW
944601 AF1-125 C Adder 21.66 MW 18.41 MW
944602 AF1-125 E Adder 49.58 MW 42.15 MW
944631 AF1-128 C Adder 29.92 MW 25.43 MW
958261 AF2-120 C Adder 3.95 MW 3.36 MW
958262 AF2-120 E Adder 2.63 MW 2.24 MW
962271 AG1-075 C Adder 11.49 MW 9.77 MW
962272 AG1-075 E Adder 7.0 MW 5.95 MW
965281 AG1-393 C Adder 1.48 MW 1.26 MW
965282 AG1-393 E Adder 0.99 MW 0.84 MW
965691 AG1-437 C Adder 4.24 MW 3.61 MW
965701 AG1-438 C Adder 4.39 MW 3.73 MW
934501 AD1-074 C Adder 14.83 MW 12.6 MW
934502 AD1-074 E Adder 7.55 MW 6.42 MW
934511 AD1-075 C Adder 3.71 MW 3.15 MW
934512 AD1-075 E Adder 1.89 MW 1.6 MW
935161 AD1-151 C Adder 10.57 MW 8.98 MW
935162 AD1-151 E Adder 7.04 MW 5.99 MW
938531 AE1-072 C Adder 8.5 MW 7.23 MW
938532 AE1-072 E Adder 4.43 MW 3.77 MW
939191 AE1-149 C Adder 6.47 MW 5.5 MW
939192 AE1-149 E Adder 4.31 MW 3.67 MW
939602 AE1-190 E Adder 0.93 MW 0.79 MW
940431 AE2-027 C Adder 9.05 MW 7.69 MW
940432 AE2-027 E Adder 6.03 MW 5.13 MW
940481 AE2-033 C Adder 7.21 MW 6.13 MW
940482 AE2-033 E Adder 4.86 MW 4.13 MW
940541 AE2-040 C Adder 1.29 MW 1.1 MW
940551 AE2-041 C Adder 4.7 MW 3.99 MW
941101 AE2-104 C Adder 1.66 MW 1.41 MW
941102 AE2-104 E Adder 2.64 MW 2.25 MW
941281 AE2-122 C Adder 14.0 MW 11.9 MW
941282 AE2-122 E Adder 56.5 MW 48.03 MW
942191 AE2-231 C Adder 2.45 MW 2.08 MW
942192 AE2-231 E Adder 1.63 MW 1.39 MW
943471 AF1-018 C Adder 4.7 MW 3.99 MW
944641 AF1-129 C Adder 75.65 MW 64.3 MW
963622 AG1-213 E Adder 0.44 MW 0.37 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.38 MW 2.38 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 23.76 MW 23.76 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.01 MW 1.01 MW
NY PJM->LTFIMP_NY CLTF 0.51 MW 0.51 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.2 MW 3.2 MW
TVA LTFEXP_TVA->PJM CLTF 0.88 MW 0.88 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.05 MW 0.05 MW
MEC LTFEXP_MEC->PJM CLTF 0.13 MW 0.13 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.12 MW 0.12 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.16 MW 1.16 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.45 MW 6.45 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.52 MW 1.52 MW

Details for 6THRASHER-6YADKIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6THRASHER-6YADKIN 230.0 kV Ckt 1 line
314508 to 314514 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 136.38 818.74 B 1116.58 297.47
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 6THRASHER-6YADKIN 230.0 kV Ckt 1 line
314508 to 314514 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 135.79 818.74 B 1111.76 297.11
Topology Case Flowgate Details for 6THRASHER-6YADKIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.19 MW 0.16 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.76 MW 0.64 MW
962332 AG1-082 E Adder 0.5 MW 0.43 MW
962341 AG1-083 C Adder 0.76 MW 0.64 MW
962342 AG1-083 E Adder 0.5 MW 0.43 MW
964801 AG1-343 C Adder 2.02 MW 1.71 MW
964802 AG1-343 E Adder 1.58 MW 1.35 MW
966801 AG1-551 C Adder 0.85 MW 0.72 MW
966802 AG1-551 E Adder 0.44 MW 0.38 MW
965291 AG1-394 C Adder 0.29 MW 0.24 MW
965292 AG1-394 E Adder 0.53 MW 0.45 MW
314541 3WATKINS Adder 0.26 MW 0.22 MW
920042 AA2-088 E OP Adder 3.62 MW 3.08 MW
934521 AD1-076 C 50/50 8.15 MW 8.15 MW
934522 AD1-076 E 50/50 4.15 MW 4.15 MW
943172 AE2-346 E Adder 0.23 MW 0.19 MW
316141 AB2-099 E Adder 0.09 MW 0.08 MW
900672 V4-068 E Adder 0.12 MW 0.11 MW
940491 AE2-034 C 50/50 0.84 MW 0.84 MW
940492 AE2-034 E 50/50 2.42 MW 2.42 MW
957521 AF2-046 C Adder 5.59 MW 4.75 MW
957522 AF2-046 E Adder 2.82 MW 2.4 MW
314539 3UNCAMP Adder 2.42 MW 2.06 MW
916042 Z1-036 E 50/50 28.14 MW 28.14 MW
938771 AE1-103 C Adder 1.2 MW 1.02 MW
938772 AE1-103 E Adder 1.66 MW 1.41 MW
313526 AB2-022 C 50/50 0.5 MW 0.5 MW
314507 3THOMPSN Adder 0.92 MW 0.78 MW
314525 6KINGFORK Adder 0.38 MW 0.33 MW
314550 6HICKORY 50/50 4.21 MW 4.21 MW
935112 AD1-144 E Adder 0.36 MW 0.3 MW
942341 AE2-247 C Adder 0.54 MW 0.46 MW
942342 AE2-247 E Adder 0.74 MW 0.63 MW
943461 AF1-017 C Adder 0.49 MW 0.41 MW
943462 AF1-017 E Adder 0.79 MW 0.67 MW
943612 AF1-032 E Adder 0.48 MW 0.41 MW
944871 AF1-152 C 50/50 5.29 MW 5.29 MW
944872 AF1-152 E 50/50 3.53 MW 3.53 MW
315605 6W1-029WIND 50/50 0.72 MW 0.72 MW
315611 6Z1-036WIND 50/50 0.6 MW 0.6 MW
913392 Y1-086 E 50/50 3.16 MW 3.16 MW
916192 Z1-068 E 50/50 2.71 MW 2.71 MW
923832 AB2-022 E 50/50 1.78 MW 1.78 MW
957492 AF2-043 E Adder 0.73 MW 0.62 MW
901082 W1-029 E 50/50 31.91 MW 31.91 MW
917122 Z2-027 E 50/50 1.76 MW 1.76 MW
925522 AC1-027 E 50/50 1.71 MW 1.71 MW
941501 AE2-147 C 50/50 15.87 MW 15.87 MW
941502 AE2-147 E 50/50 10.58 MW 10.58 MW
957871 AF2-081 C 50/50 17.74 MW 17.74 MW
957872 AF2-081 E 50/50 7.61 MW 7.61 MW
958161 AF2-110 C Adder 0.64 MW 0.54 MW
958162 AF2-110 E Adder 1.01 MW 0.86 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
933981 AD1-022 C 50/50 5.29 MW 5.29 MW
933982 AD1-022 E 50/50 2.88 MW 2.88 MW
961681 AG1-008 C Adder 5.59 MW 4.75 MW
961682 AG1-008 E Adder 2.82 MW 2.4 MW
314594 6PLYMOUTH TP 50/50 0.22 MW 0.22 MW
314632 6AYDLETT TAP 50/50 2.29 MW 2.29 MW
316185 AD1-033 C 50/50 2.21 MW 2.21 MW
316316 AC1-027 C 50/50 0.41 MW 0.41 MW
316320 Y1-086 C 50/50 0.29 MW 0.29 MW
316321 Z2-027 C 50/50 0.44 MW 0.44 MW
917332 KELFORD E Adder 0.56 MW 0.48 MW
934065 AD1-033 E 50/50 9.71 MW 9.71 MW
937226 AE2-253 E 50/50 10.73 MW 10.73 MW
918512 AA1-065 E OP Adder 2.35 MW 2.0 MW
316017 AA1-139 ULT1 50/50 1.78 MW 1.78 MW
316018 AA1-139 ULT2 50/50 1.78 MW 1.78 MW
919153 AA1-139 E2 50/50 7.26 MW 7.26 MW
919152 AA1-139 E1 50/50 7.26 MW 7.26 MW
315614 AA2-178 C 50/50 1.14 MW 1.14 MW
920692 AA2-178 E 50/50 3.22 MW 3.22 MW
925122 AB2-169 E Adder 2.94 MW 2.5 MW
316311 AC2-079 C Adder 2.14 MW 1.82 MW
932596 AC2-079 E Adder 3.49 MW 2.97 MW
316349 AD2-085 C Adder 1.24 MW 1.05 MW
936666 AD2-085 E Adder 2.02 MW 1.72 MW
316388 AE2-253 GEN 50/50 3.35 MW 3.35 MW
944581 AF1-123 C 50/50 90.09 MW 90.09 MW
944582 AF1-123 E 50/50 206.31 MW 206.31 MW
944591 AF1-124 C 50/50 90.42 MW 90.42 MW
944592 AF1-124 E 50/50 207.05 MW 207.05 MW
944601 AF1-125 C 50/50 88.71 MW 88.71 MW
944602 AF1-125 E 50/50 203.07 MW 203.07 MW
965691 AG1-437 C Adder 5.61 MW 4.77 MW
965692 AG1-437 E Adder 3.74 MW 3.18 MW
965701 AG1-438 C Adder 5.61 MW 4.77 MW
965702 AG1-438 E Adder 3.74 MW 3.18 MW
965741 AG1-442 C Adder 3.27 MW 2.78 MW
965751 AG1-443 C Adder 3.27 MW 2.78 MW
934501 AD1-074 C 50/50 22.44 MW 22.44 MW
934502 AD1-074 E 50/50 11.42 MW 11.42 MW
934511 AD1-075 C 50/50 5.61 MW 5.61 MW
934512 AD1-075 E 50/50 2.86 MW 2.86 MW
938531 AE1-072 C 50/50 30.08 MW 30.08 MW
938532 AE1-072 E 50/50 15.68 MW 15.68 MW
941101 AE2-104 C Adder 1.56 MW 1.32 MW
941102 AE2-104 E Adder 2.47 MW 2.1 MW
941281 AE2-122 C 50/50 43.79 MW 43.79 MW
941282 AE2-122 E 50/50 176.7 MW 176.7 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 2.72 MW 2.72 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.82 MW 1.82 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 8.01 MW 8.01 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.2 MW 0.2 MW
NY PJM->LTFIMP_NY CLTF 0.09 MW 0.09 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.1 MW 0.1 MW
WEC LTFEXP_WEC->PJM CLTF 0.06 MW 0.06 MW
CPLE LTFEXP_CPLE->PJM CLTF 1.09 MW 1.09 MW
TVA LTFEXP_TVA->PJM CLTF 0.48 MW 0.48 MW
MEC LTFEXP_MEC->PJM CLTF 0.33 MW 0.33 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.62 MW 0.62 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.02 MW 0.02 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 1.28 MW 1.28 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.52 MW 0.52 MW

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 105.29 2858.0 B 3009.3 126.36
Decrease
Topology Case Flowgate Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314541 3WATKINS Adder 0.52 MW 0.45 MW
940492 AE2-034 E Adder 2.38 MW 2.02 MW
314539 3UNCAMP Adder 4.71 MW 4.01 MW
916042 Z1-036 E Adder 23.02 MW 19.57 MW
938771 AE1-103 C Adder 2.3 MW 1.96 MW
938772 AE1-103 E Adder 3.18 MW 2.7 MW
314229 6MT RD221 50/50 0.15 MW 0.15 MW
314236 6NRTHEST 50/50 0.21 MW 0.21 MW
314331 6POE Adder 1.08 MW 0.92 MW
314507 3THOMPSN Adder 1.73 MW 1.47 MW
314525 6KINGFORK Adder 0.89 MW 0.76 MW
314550 6HICKORY Adder 1.84 MW 1.56 MW
315060 1CHESTF5 50/50 74.89 MW 74.89 MW
315061 1CHESTG7 50/50 4.25 MW 4.25 MW
315062 1CHESTS7 50/50 1.95 MW 1.95 MW
315063 1CHESTG8 50/50 4.18 MW 4.18 MW
315064 1CHESTS8 50/50 2.15 MW 2.15 MW
315065 1CHESTF6 Adder 19.53 MW 16.6 MW
315067 1DARBY 1 50/50 2.94 MW 2.94 MW
315068 1DARBY 2 50/50 2.94 MW 2.94 MW
315069 1DARBY 3 50/50 2.95 MW 2.95 MW
315070 1DARBY 4 50/50 2.96 MW 2.96 MW
315073 1STONECA Adder 7.25 MW 6.17 MW
315083 1SPRUNCA Adder 8.99 MW 7.64 MW
315084 1SPRUNCB Adder 8.99 MW 7.64 MW
315092 1YORKTN3 Adder 149.29 MW 126.89 MW
925865 AC1-065 E Adder 19.0 MW 16.15 MW
926412 AC1-112 E 50/50 1.53 MW 1.53 MW
926662 AC1-147 E Adder 1.14 MW 0.97 MW
926755 AC1-161 E Adder 11.25 MW 9.56 MW
927226 AC1-216 E Adder 7.75 MW 6.59 MW
934392 AD1-063 E Adder 1.25 MW 1.06 MW
934782 AD1-105 E Adder 4.63 MW 3.94 MW
935112 AD1-144 E Adder 0.83 MW 0.7 MW
936582 AD2-073 E Adder 0.95 MW 0.81 MW
936591 AD2-074 C Adder 5.88 MW 5.0 MW
936592 AD2-074 E Adder 9.59 MW 8.15 MW
942152 AE2-227 E Adder 1.68 MW 1.43 MW
942162 AE2-228 E Adder 1.39 MW 1.18 MW
942341 AE2-247 C Adder 1.26 MW 1.07 MW
942342 AE2-247 E Adder 1.74 MW 1.48 MW
943461 AF1-017 C Adder 1.14 MW 0.97 MW
943462 AF1-017 E Adder 1.86 MW 1.58 MW
943612 AF1-032 E Adder 0.78 MW 0.66 MW
943741 AF1-042 C Adder 3.08 MW 2.62 MW
943742 AF1-042 E Adder 5.02 MW 4.27 MW
944871 AF1-152 C Adder 4.33 MW 3.68 MW
944872 AF1-152 E Adder 2.89 MW 2.45 MW
961951 AG1-038 C Adder 3.4 MW 2.89 MW
961952 AG1-038 E Adder 4.7 MW 3.99 MW
966661 AG1-536 C Adder 5.57 MW 4.74 MW
966662 AG1-536 E Adder 7.49 MW 6.36 MW
966871 AG1-558 C 50/50 3.02 MW 3.02 MW
966872 AG1-558 E 50/50 1.52 MW 1.52 MW
315216 1CUNINGA 50/50 7.05 MW 7.05 MW
315217 1CUNINGB 50/50 7.05 MW 7.05 MW
315218 1CUNINGC 50/50 7.05 MW 7.05 MW
315219 1CUNINGD 50/50 15.78 MW 15.78 MW
315260 1GOSPORTA Adder 1.83 MW 1.55 MW
315261 1GOSPORTB Adder 2.33 MW 1.98 MW
315262 1GOSPORTC Adder 1.98 MW 1.68 MW
316075 AC2-137 C 50/50 0.46 MW 0.46 MW
316076 AC2-137 E 50/50 1.74 MW 1.74 MW
316078 AC2-138 E Adder 0.92 MW 0.78 MW
316157 AD2-030 E Adder 1.33 MW 1.13 MW
913392 Y1-086 E Adder 1.82 MW 1.55 MW
916192 Z1-068 E Adder 1.6 MW 1.36 MW
923832 AB2-022 E Adder 1.03 MW 0.87 MW
923842 AB2-024 E Adder 2.13 MW 1.81 MW
930122 AB1-027 E 50/50 1.88 MW 1.88 MW
938552 AE1-074 E Adder 1.0 MW 0.85 MW
939312 AE1-162 E Adder 1.32 MW 1.12 MW
946262 AF1-291 E Adder 1.4 MW 1.19 MW
957492 AF2-043 E Adder 1.19 MW 1.01 MW
957601 AF2-054 C Adder 2.37 MW 2.02 MW
957602 AF2-054 E Adder 1.58 MW 1.34 MW
962861 AG1-135 C Adder 6.32 MW 5.37 MW
962862 AG1-135 E Adder 4.21 MW 3.58 MW
962962 AG1-145 E Adder 1.68 MW 1.43 MW
962971 AG1-146 C Adder 3.3 MW 2.8 MW
962972 AG1-146 E Adder 2.2 MW 1.87 MW
962981 AG1-147 C Adder 7.7 MW 6.54 MW
962982 AG1-147 E Adder 5.13 MW 4.36 MW
963611 AG1-210 C Adder 0.66 MW 0.56 MW
963612 AG1-210 E Adder 0.98 MW 0.84 MW
964211 AG1-282 C Adder 2.06 MW 1.75 MW
964212 AG1-282 E Adder 1.37 MW 1.17 MW
901082 W1-029 E Adder 26.12 MW 22.2 MW
917122 Z2-027 E Adder 1.11 MW 0.94 MW
925332 AB2-190 E Adder 8.25 MW 7.01 MW
925522 AC1-027 E Adder 1.04 MW 0.88 MW
941501 AE2-147 C Adder 12.99 MW 11.04 MW
941502 AE2-147 E Adder 8.66 MW 7.36 MW
942001 AE2-212 C Adder 1.95 MW 1.65 MW
942002 AE2-212 E Adder 1.3 MW 1.1 MW
957832 AF2-077 E Adder 1.55 MW 1.32 MW
957871 AF2-081 C Adder 8.37 MW 7.12 MW
957872 AF2-081 E Adder 3.59 MW 3.05 MW
958161 AF2-110 C Adder 1.14 MW 0.97 MW
958162 AF2-110 E Adder 1.81 MW 1.54 MW
313811 6ELKO L286 50/50 1.81 MW 1.81 MW
314181 3NORNECK Adder 0.87 MW 0.74 MW
933291 AC2-141 C Adder 26.35 MW 22.4 MW
933292 AC2-141 E Adder 11.25 MW 9.56 MW
934011 AD1-025 C Adder 16.94 MW 14.39 MW
934012 AD1-025 E Adder 10.03 MW 8.53 MW
927041 AC1-191 C 50/50 12.11 MW 12.11 MW
927042 AC1-191 E 50/50 6.03 MW 6.03 MW
313053 6PAPERMILL Adder 7.84 MW 6.66 MW
314632 6AYDLETT TAP Adder 1.13 MW 0.96 MW
316004 AC1-112 C 50/50 0.42 MW 0.42 MW
316160 AE1-175 E Adder 1.39 MW 1.18 MW
316169 AC1-164 GEN 50/50 8.23 MW 8.23 MW
316233 AE1-074 C Adder 1.98 MW 1.69 MW
316240 AF1-291 C Adder 2.1 MW 1.79 MW
316301 AE2-228 C Adder 2.08 MW 1.77 MW
316304 AE2-227 C Adder 2.51 MW 2.14 MW
316312 AB1-027 C 50/50 0.67 MW 0.67 MW
926785 AC1-164_E 50/50 24.36 MW 24.36 MW
934065 AD1-033 E Adder 4.24 MW 3.6 MW
937226 AE2-253 E Adder 4.9 MW 4.17 MW
939612 AE1-191 E Adder 6.45 MW 5.48 MW
963221 AG1-171 C Adder 2.16 MW 1.83 MW
963222 AG1-171 E Adder 1.44 MW 1.22 MW
963231 AG1-172 C Adder 2.16 MW 1.83 MW
963232 AG1-172 E Adder 1.44 MW 1.22 MW
963241 AG1-173 C Adder 2.16 MW 1.83 MW
963242 AG1-173 E Adder 1.44 MW 1.22 MW
939246 AE1-155 E Adder 9.02 MW 7.67 MW
919153 AA1-139 E2 Adder 3.42 MW 2.91 MW
919152 AA1-139 E1 Adder 3.42 MW 2.91 MW
920692 AA2-178 E Adder 3.17 MW 2.69 MW
924814 AB2-134 E Adder 12.69 MW 10.79 MW
316084 AB2-161 E Adder 4.74 MW 4.03 MW
932046 AC2-012 E Adder 11.24 MW 9.55 MW
316311 AC2-079 C Adder 4.83 MW 4.1 MW
932596 AC2-079 E Adder 7.88 MW 6.7 MW
934146 AD1-041 E Adder 4.03 MW 3.43 MW
934576 AD1-082 E Adder 3.78 MW 3.21 MW
316349 AD2-085 C Adder 2.9 MW 2.47 MW
936666 AD2-085 E Adder 4.73 MW 4.02 MW
961611 AG1-000B C Adder 15.51 MW 13.19 MW
941591 AE2-156 C Adder 15.35 MW 13.05 MW
942371 AE2-250 C Adder 9.18 MW 7.81 MW
942372 AE2-250 E Adder 4.85 MW 4.12 MW
944581 AF1-123 C Adder 38.27 MW 32.53 MW
944582 AF1-123 E Adder 87.64 MW 74.49 MW
944591 AF1-124 C Adder 38.41 MW 32.65 MW
944592 AF1-124 E Adder 87.95 MW 74.76 MW
944601 AF1-125 C Adder 37.68 MW 32.03 MW
944602 AF1-125 E Adder 86.26 MW 73.32 MW
944631 AF1-128 C Adder 46.86 MW 39.83 MW
958261 AF2-120 C Adder 6.48 MW 5.5 MW
958262 AF2-120 E Adder 4.32 MW 3.67 MW
962271 AG1-075 C Adder 15.85 MW 13.47 MW
962272 AG1-075 E Adder 9.66 MW 8.21 MW
965281 AG1-393 C Adder 2.04 MW 1.74 MW
965282 AG1-393 E Adder 1.36 MW 1.16 MW
935161 AD1-151 C Adder 16.35 MW 13.9 MW
935162 AD1-151 E Adder 10.9 MW 9.27 MW
938531 AE1-072 C Adder 14.69 MW 12.48 MW
938532 AE1-072 E Adder 7.66 MW 6.51 MW
939191 AE1-149 C Adder 9.31 MW 7.91 MW
939192 AE1-149 E Adder 6.21 MW 5.28 MW
939602 AE1-190 E Adder 1.61 MW 1.37 MW
940431 AE2-027 C Adder 12.5 MW 10.63 MW
940432 AE2-027 E Adder 8.34 MW 7.08 MW
940551 AE2-041 C Adder 8.3 MW 7.06 MW
941101 AE2-104 C Adder 2.79 MW 2.37 MW
941102 AE2-104 E Adder 4.44 MW 3.77 MW
941281 AE2-122 C Adder 24.18 MW 20.55 MW
941282 AE2-122 E Adder 97.57 MW 82.94 MW
943471 AF1-018 C Adder 8.3 MW 7.06 MW
944641 AF1-129 C Adder 101.88 MW 86.6 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 47.67 MW 47.67 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 24.89 MW 24.89 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 65.2 MW 65.2 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.36 MW 5.36 MW
NY PJM->LTFIMP_NY CLTF 2.37 MW 2.37 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.9 MW 1.9 MW
WEC LTFEXP_WEC->PJM CLTF 0.97 MW 0.97 MW
CPLE LTFEXP_CPLE->PJM CLTF 6.85 MW 6.85 MW
TVA LTFEXP_TVA->PJM CLTF 6.13 MW 6.13 MW
MEC LTFEXP_MEC->PJM CLTF 5.17 MW 5.17 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.55 MW 7.55 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.34 MW 0.34 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 34.02 MW 34.02 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 3.27 MW 3.27 MW

Details for 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 1 transformer
314909 to 314466 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 117.53 1115.59 B 1311.19 420.59
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 1 transformer
314909 to 314466 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 117.51 1115.59 B 1310.95 420.59
Topology Case Flowgate Details for 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 588_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944581 AF1-123 C 50/50 127.39 MW 127.39 MW
944582 AF1-123 E 50/50 291.7 MW 291.7 MW
944591 AF1-124 C 50/50 127.84 MW 127.84 MW
944592 AF1-124 E 50/50 292.75 MW 292.75 MW
944601 AF1-125 C 50/50 125.42 MW 125.42 MW
944602 AF1-125 E 50/50 287.12 MW 287.12 MW

Details for 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 2 transformer l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 2 transformer
314909 to 314466 ckt 2
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 117.38 1103.28 B 1295.03 415.41
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 2 transformer
314909 to 314466 ckt 2
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 117.36 1103.28 B 1294.79 415.41
Topology Case Flowgate Details for 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 2 transformer l/o DVP_P1-2: LN 588_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944581 AF1-123 C 50/50 125.81 MW 125.81 MW
944582 AF1-123 E 50/50 288.1 MW 288.1 MW
944591 AF1-124 C 50/50 126.26 MW 126.26 MW
944592 AF1-124 E 50/50 289.15 MW 289.15 MW
944601 AF1-125 C 50/50 123.88 MW 123.88 MW
944602 AF1-125 E 50/50 283.58 MW 283.58 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 2 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 2 line
314902 to 314914 ckt 2
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 110.71 4094.64 B 4533.15 206.35
Addition
Topology Case Flowgate Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 2 line l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 10.18 MW 10.18 MW
963042 AG1-153 E 50/50 15.27 MW 15.27 MW
964801 AG1-343 C Adder 8.17 MW 6.95 MW
964802 AG1-343 E Adder 6.42 MW 5.46 MW
966811 AG1-552 C Adder 2.85 MW 2.42 MW
966812 AG1-552 E Adder 1.36 MW 1.15 MW
965291 AG1-394 C Adder 1.17 MW 0.99 MW
965292 AG1-394 E Adder 2.15 MW 1.83 MW
966621 AG1-532 C 50/50 1.95 MW 1.95 MW
966622 AG1-532 E 50/50 1.3 MW 1.3 MW
314541 3WATKINS Adder 0.94 MW 0.8 MW
314572 3EMPORIA 50/50 0.6 MW 0.6 MW
315153 1CLOVER1 50/50 18.94 MW 18.94 MW
315154 1CLOVER2 50/50 18.77 MW 18.77 MW
918492 AA1-063AE OP Adder 5.63 MW 4.79 MW
919692 AA2-053 E OP Adder 5.85 MW 4.98 MW
920042 AA2-088 E OP Adder 14.49 MW 12.32 MW
934521 AD1-076 C Adder 16.81 MW 14.29 MW
934522 AD1-076 E Adder 8.57 MW 7.28 MW
942931 AE2-313 C 50/50 66.25 MW 66.25 MW
942932 AE2-313 E 50/50 44.17 MW 44.17 MW
944011 AF1-069 C 50/50 23.88 MW 23.88 MW
944012 AF1-069 E 50/50 9.28 MW 9.28 MW
960081 AF2-299 C 50/50 2.82 MW 2.82 MW
960082 AF2-299 E 50/50 1.88 MW 1.88 MW
900672 V4-068 E Adder 0.49 MW 0.42 MW
923263 AB1-132 E OP Adder 8.55 MW 7.27 MW
923573 AB1-173 E OP Adder 4.56 MW 3.88 MW
940492 AE2-034 E Adder 4.22 MW 3.59 MW
941031 AE2-094 C 50/50 73.09 MW 73.09 MW
941032 AE2-094 E 50/50 32.74 MW 32.74 MW
946281 AF1-292 C 50/50 2.15 MW 2.15 MW
946282 AF1-292 E 50/50 1.44 MW 1.44 MW
957481 AF2-042 C 50/50 89.97 MW 89.97 MW
957482 AF2-042 E 50/50 59.98 MW 59.98 MW
957521 AF2-046 C Adder 21.65 MW 18.4 MW
957522 AF2-046 E Adder 10.94 MW 9.3 MW
314539 3UNCAMP Adder 8.2 MW 6.97 MW
916042 Z1-036 E Adder 39.05 MW 33.19 MW
938771 AE1-103 C Adder 3.94 MW 3.35 MW
938772 AE1-103 E Adder 5.44 MW 4.63 MW
313526 AB2-022 C 50/50 0.47 MW 0.47 MW
314507 3THOMPSN Adder 2.7 MW 2.29 MW
314550 6HICKORY 50/50 2.96 MW 2.96 MW
926662 AC1-147 E Adder 1.77 MW 1.5 MW
926755 AC1-161 E 50/50 17.94 MW 17.94 MW
943612 AF1-032 E Adder 1.24 MW 1.06 MW
944871 AF1-152 C Adder 7.16 MW 6.09 MW
944872 AF1-152 E Adder 4.78 MW 4.06 MW
315102 1BRUNSWICKG1 50/50 13.97 MW 13.97 MW
315103 1BRUNSWICKG2 50/50 13.97 MW 13.97 MW
315104 1BRUNSWICKG3 50/50 13.97 MW 13.97 MW
315105 1BRUNSWICKS1 50/50 29.02 MW 29.02 MW
315108 1ELIZAR1 50/50 3.99 MW 3.99 MW
315109 1ELIZAR2 50/50 3.92 MW 3.92 MW
315110 1ELIZAR3 50/50 4.04 MW 4.04 MW
315241 1Z1-086 GT1 50/50 17.88 MW 17.88 MW
315242 1Z1-086 GT2 50/50 17.88 MW 17.88 MW
315243 1Z1-086 GT3 50/50 17.88 MW 17.88 MW
315244 1Z1-086 ST 50/50 31.12 MW 31.12 MW
315260 1GOSPORTA Adder 2.85 MW 2.42 MW
315261 1GOSPORTB Adder 3.64 MW 3.09 MW
315262 1GOSPORTC Adder 3.09 MW 2.62 MW
913392 Y1-086 E 50/50 2.98 MW 2.98 MW
916192 Z1-068 E 50/50 2.53 MW 2.53 MW
923832 AB2-022 E 50/50 1.68 MW 1.68 MW
923852 AB2-025 E 50/50 1.68 MW 1.68 MW
957492 AF2-043 E Adder 1.91 MW 1.63 MW
901082 W1-029 E Adder 43.22 MW 36.73 MW
917122 Z2-027 E 50/50 1.82 MW 1.82 MW
925522 AC1-027 E 50/50 1.64 MW 1.64 MW
941501 AE2-147 C Adder 21.49 MW 18.27 MW
941502 AE2-147 E Adder 14.33 MW 12.18 MW
957871 AF2-081 C 50/50 13.55 MW 13.55 MW
957872 AF2-081 E 50/50 5.81 MW 5.81 MW
958161 AF2-110 C Adder 1.82 MW 1.54 MW
958162 AF2-110 E Adder 2.89 MW 2.46 MW
926071 AC1-086 C Adder 29.39 MW 24.98 MW
926072 AC1-086 E Adder 13.38 MW 11.37 MW
933291 AC2-141 C 50/50 42.02 MW 42.02 MW
933292 AC2-141 E 50/50 17.94 MW 17.94 MW
939411 AE1-173 C 50/50 153.09 MW 153.09 MW
939412 AE1-173 E 50/50 102.06 MW 102.06 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
933981 AD1-022 C Adder 12.04 MW 10.24 MW
933982 AD1-022 E Adder 6.56 MW 5.57 MW
962572 AG1-106 E Adder 1.9 MW 1.62 MW
961681 AG1-008 C Adder 21.65 MW 18.4 MW
961682 AG1-008 E Adder 10.94 MW 9.3 MW
962571 AG1-106 C Adder 4.16 MW 3.53 MW
314594 6PLYMOUTH TP Adder 0.44 MW 0.38 MW
314632 6AYDLETT TAP 50/50 1.84 MW 1.84 MW
316023 AB2-100 C2 50/50 1.26 MW 1.26 MW
316185 AD1-033 C 50/50 1.55 MW 1.55 MW
316294 AC1-161 C 50/50 6.38 MW 6.38 MW
316315 AB2-025 C 50/50 0.55 MW 0.55 MW
316316 AC1-027 C 50/50 0.4 MW 0.4 MW
316320 Y1-086 C 50/50 0.28 MW 0.28 MW
316321 Z2-027 C 50/50 0.46 MW 0.46 MW
316365 AB2-100 C1 50/50 1.26 MW 1.26 MW
924516 AB2-100 E1 50/50 4.1 MW 4.1 MW
924517 AB2-100 E2 50/50 4.1 MW 4.1 MW
934065 AD1-033 E 50/50 6.8 MW 6.8 MW
937226 AE2-253 E 50/50 7.92 MW 7.92 MW
316017 AA1-139 ULT1 50/50 1.36 MW 1.36 MW
316018 AA1-139 ULT2 50/50 1.36 MW 1.36 MW
919153 AA1-139 E2 50/50 5.54 MW 5.54 MW
919152 AA1-139 E1 50/50 5.54 MW 5.54 MW
920692 AA2-178 E Adder 5.63 MW 4.78 MW
923994 AB2-040_E Adder 8.55 MW 7.26 MW
316088 AB2-174 E Adder 9.06 MW 7.7 MW
932046 AC2-012 E Adder 17.51 MW 14.89 MW
316388 AE2-253 GEN 50/50 2.48 MW 2.48 MW
941591 AE2-156 C Adder 23.96 MW 20.36 MW
944581 AF1-123 C 50/50 62.5 MW 62.5 MW
944582 AF1-123 E 50/50 143.11 MW 143.11 MW
944591 AF1-124 C 50/50 62.72 MW 62.72 MW
944592 AF1-124 E 50/50 143.63 MW 143.63 MW
944601 AF1-125 C 50/50 61.53 MW 61.53 MW
944602 AF1-125 E 50/50 140.86 MW 140.86 MW
965691 AG1-437 C Adder 3.43 MW 2.92 MW
965811 AG1-449 C 50/50 42.9 MW 42.9 MW
313764 3SOCKMAN Adder 0.99 MW 0.84 MW
934501 AD1-074 C Adder 46.28 MW 39.34 MW
934502 AD1-074 E Adder 23.56 MW 20.02 MW
934511 AD1-075 C Adder 11.57 MW 9.83 MW
934512 AD1-075 E Adder 5.89 MW 5.01 MW
934611 AD1-087 C 50/50 1.86 MW 1.86 MW
934612 AD1-087 E 50/50 5.79 MW 5.79 MW
935171 AD1-152 C 50/50 1.91 MW 1.91 MW
935172 AD1-152 E 50/50 8.46 MW 8.46 MW
937481 AD2-202 C 50/50 0.54 MW 0.54 MW
937482 AD2-202 E 50/50 1.69 MW 1.69 MW
938531 AE1-072 C 50/50 23.83 MW 23.83 MW
938532 AE1-072 E 50/50 12.42 MW 12.42 MW
940481 AE2-033 C 50/50 23.37 MW 23.37 MW
940482 AE2-033 E 50/50 15.76 MW 15.76 MW
940541 AE2-040 C 50/50 4.16 MW 4.16 MW
940641 AE2-051 C 50/50 30.95 MW 30.95 MW
940642 AE2-051 E 50/50 20.64 MW 20.64 MW
941101 AE2-104 C Adder 4.45 MW 3.78 MW
941102 AE2-104 E Adder 7.08 MW 6.01 MW
941281 AE2-122 C 50/50 38.35 MW 38.35 MW
941282 AE2-122 E 50/50 154.74 MW 154.74 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 52.7 MW 52.7 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 35.44 MW 35.44 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 143.26 MW 143.26 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.45 MW 5.45 MW
NY PJM->LTFIMP_NY CLTF 2.51 MW 2.51 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.09 MW 2.09 MW
WEC LTFEXP_WEC->PJM CLTF 1.09 MW 1.09 MW
CPLE LTFEXP_CPLE->PJM CLTF 17.02 MW 17.02 MW
TVA LTFEXP_TVA->PJM CLTF 9.44 MW 9.44 MW
MEC LTFEXP_MEC->PJM CLTF 6.42 MW 6.42 MW
LAGN LTFEXP_LAGN->PJM CLTF 11.95 MW 11.95 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.4 MW 0.4 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 34.7 MW 34.7 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.12 MW 8.12 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P1: Carson-Midlothian_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P1: Carson-Midlothian_SRT-A
CONTINGENCY 'DVP_P1: Carson-Midlothian_SRT-A'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 2   /*8CARSON      500.0 - 8MDLTHAN     500.0
END
OP AC 110.71 4094.64 B 4533.15 206.35
Addition
Topology Case Flowgate Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P1: Carson-Midlothian_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 10.18 MW 10.18 MW
963042 AG1-153 E 50/50 15.27 MW 15.27 MW
964801 AG1-343 C Adder 8.17 MW 6.95 MW
964802 AG1-343 E Adder 6.42 MW 5.46 MW
966811 AG1-552 C Adder 2.85 MW 2.42 MW
966812 AG1-552 E Adder 1.36 MW 1.15 MW
965291 AG1-394 C Adder 1.17 MW 0.99 MW
965292 AG1-394 E Adder 2.15 MW 1.83 MW
966621 AG1-532 C 50/50 1.95 MW 1.95 MW
966622 AG1-532 E 50/50 1.3 MW 1.3 MW
314541 3WATKINS Adder 0.94 MW 0.8 MW
314572 3EMPORIA 50/50 0.6 MW 0.6 MW
315153 1CLOVER1 50/50 18.94 MW 18.94 MW
315154 1CLOVER2 50/50 18.77 MW 18.77 MW
918492 AA1-063AE OP Adder 5.63 MW 4.79 MW
919692 AA2-053 E OP Adder 5.85 MW 4.98 MW
920042 AA2-088 E OP Adder 14.49 MW 12.32 MW
934521 AD1-076 C Adder 16.81 MW 14.29 MW
934522 AD1-076 E Adder 8.57 MW 7.28 MW
942931 AE2-313 C 50/50 66.25 MW 66.25 MW
942932 AE2-313 E 50/50 44.17 MW 44.17 MW
944011 AF1-069 C 50/50 23.88 MW 23.88 MW
944012 AF1-069 E 50/50 9.28 MW 9.28 MW
960081 AF2-299 C 50/50 2.82 MW 2.82 MW
960082 AF2-299 E 50/50 1.88 MW 1.88 MW
900672 V4-068 E Adder 0.49 MW 0.42 MW
923263 AB1-132 E OP Adder 8.55 MW 7.27 MW
923573 AB1-173 E OP Adder 4.56 MW 3.88 MW
940492 AE2-034 E Adder 4.22 MW 3.59 MW
941031 AE2-094 C 50/50 73.09 MW 73.09 MW
941032 AE2-094 E 50/50 32.74 MW 32.74 MW
946281 AF1-292 C 50/50 2.15 MW 2.15 MW
946282 AF1-292 E 50/50 1.44 MW 1.44 MW
957481 AF2-042 C 50/50 89.97 MW 89.97 MW
957482 AF2-042 E 50/50 59.98 MW 59.98 MW
957521 AF2-046 C Adder 21.65 MW 18.4 MW
957522 AF2-046 E Adder 10.94 MW 9.3 MW
314539 3UNCAMP Adder 8.2 MW 6.97 MW
916042 Z1-036 E Adder 39.05 MW 33.19 MW
938771 AE1-103 C Adder 3.94 MW 3.35 MW
938772 AE1-103 E Adder 5.44 MW 4.63 MW
313526 AB2-022 C 50/50 0.47 MW 0.47 MW
314507 3THOMPSN Adder 2.7 MW 2.29 MW
314550 6HICKORY 50/50 2.96 MW 2.96 MW
926662 AC1-147 E Adder 1.77 MW 1.5 MW
926755 AC1-161 E 50/50 17.94 MW 17.94 MW
943612 AF1-032 E Adder 1.24 MW 1.06 MW
944871 AF1-152 C Adder 7.16 MW 6.09 MW
944872 AF1-152 E Adder 4.78 MW 4.06 MW
315102 1BRUNSWICKG1 50/50 13.97 MW 13.97 MW
315103 1BRUNSWICKG2 50/50 13.97 MW 13.97 MW
315104 1BRUNSWICKG3 50/50 13.97 MW 13.97 MW
315105 1BRUNSWICKS1 50/50 29.02 MW 29.02 MW
315108 1ELIZAR1 50/50 3.99 MW 3.99 MW
315109 1ELIZAR2 50/50 3.92 MW 3.92 MW
315110 1ELIZAR3 50/50 4.04 MW 4.04 MW
315241 1Z1-086 GT1 50/50 17.88 MW 17.88 MW
315242 1Z1-086 GT2 50/50 17.88 MW 17.88 MW
315243 1Z1-086 GT3 50/50 17.88 MW 17.88 MW
315244 1Z1-086 ST 50/50 31.12 MW 31.12 MW
315260 1GOSPORTA Adder 2.85 MW 2.42 MW
315261 1GOSPORTB Adder 3.64 MW 3.09 MW
315262 1GOSPORTC Adder 3.09 MW 2.62 MW
913392 Y1-086 E 50/50 2.98 MW 2.98 MW
916192 Z1-068 E 50/50 2.53 MW 2.53 MW
923832 AB2-022 E 50/50 1.68 MW 1.68 MW
923852 AB2-025 E 50/50 1.68 MW 1.68 MW
957492 AF2-043 E Adder 1.91 MW 1.63 MW
901082 W1-029 E Adder 43.22 MW 36.73 MW
917122 Z2-027 E 50/50 1.82 MW 1.82 MW
925522 AC1-027 E 50/50 1.64 MW 1.64 MW
941501 AE2-147 C Adder 21.49 MW 18.27 MW
941502 AE2-147 E Adder 14.33 MW 12.18 MW
957871 AF2-081 C 50/50 13.55 MW 13.55 MW
957872 AF2-081 E 50/50 5.81 MW 5.81 MW
958161 AF2-110 C Adder 1.82 MW 1.54 MW
958162 AF2-110 E Adder 2.89 MW 2.46 MW
926071 AC1-086 C Adder 29.39 MW 24.98 MW
926072 AC1-086 E Adder 13.38 MW 11.37 MW
933291 AC2-141 C 50/50 42.02 MW 42.02 MW
933292 AC2-141 E 50/50 17.94 MW 17.94 MW
939411 AE1-173 C 50/50 153.09 MW 153.09 MW
939412 AE1-173 E 50/50 102.06 MW 102.06 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
933981 AD1-022 C Adder 12.04 MW 10.24 MW
933982 AD1-022 E Adder 6.56 MW 5.57 MW
962572 AG1-106 E Adder 1.9 MW 1.62 MW
961681 AG1-008 C Adder 21.65 MW 18.4 MW
961682 AG1-008 E Adder 10.94 MW 9.3 MW
962571 AG1-106 C Adder 4.16 MW 3.53 MW
314594 6PLYMOUTH TP Adder 0.44 MW 0.38 MW
314632 6AYDLETT TAP 50/50 1.84 MW 1.84 MW
316023 AB2-100 C2 50/50 1.26 MW 1.26 MW
316185 AD1-033 C 50/50 1.55 MW 1.55 MW
316294 AC1-161 C 50/50 6.38 MW 6.38 MW
316315 AB2-025 C 50/50 0.55 MW 0.55 MW
316316 AC1-027 C 50/50 0.4 MW 0.4 MW
316320 Y1-086 C 50/50 0.28 MW 0.28 MW
316321 Z2-027 C 50/50 0.46 MW 0.46 MW
316365 AB2-100 C1 50/50 1.26 MW 1.26 MW
924516 AB2-100 E1 50/50 4.1 MW 4.1 MW
924517 AB2-100 E2 50/50 4.1 MW 4.1 MW
934065 AD1-033 E 50/50 6.8 MW 6.8 MW
937226 AE2-253 E 50/50 7.92 MW 7.92 MW
316017 AA1-139 ULT1 50/50 1.36 MW 1.36 MW
316018 AA1-139 ULT2 50/50 1.36 MW 1.36 MW
919153 AA1-139 E2 50/50 5.54 MW 5.54 MW
919152 AA1-139 E1 50/50 5.54 MW 5.54 MW
920692 AA2-178 E Adder 5.63 MW 4.78 MW
923994 AB2-040_E Adder 8.55 MW 7.26 MW
316088 AB2-174 E Adder 9.06 MW 7.7 MW
932046 AC2-012 E Adder 17.51 MW 14.89 MW
316388 AE2-253 GEN 50/50 2.48 MW 2.48 MW
941591 AE2-156 C Adder 23.96 MW 20.36 MW
944581 AF1-123 C 50/50 62.5 MW 62.5 MW
944582 AF1-123 E 50/50 143.11 MW 143.11 MW
944591 AF1-124 C 50/50 62.72 MW 62.72 MW
944592 AF1-124 E 50/50 143.63 MW 143.63 MW
944601 AF1-125 C 50/50 61.53 MW 61.53 MW
944602 AF1-125 E 50/50 140.86 MW 140.86 MW
965691 AG1-437 C Adder 3.43 MW 2.92 MW
965811 AG1-449 C 50/50 42.9 MW 42.9 MW
313764 3SOCKMAN Adder 0.99 MW 0.84 MW
934501 AD1-074 C Adder 46.28 MW 39.34 MW
934502 AD1-074 E Adder 23.56 MW 20.02 MW
934511 AD1-075 C Adder 11.57 MW 9.83 MW
934512 AD1-075 E Adder 5.89 MW 5.01 MW
934611 AD1-087 C 50/50 1.86 MW 1.86 MW
934612 AD1-087 E 50/50 5.79 MW 5.79 MW
935171 AD1-152 C 50/50 1.91 MW 1.91 MW
935172 AD1-152 E 50/50 8.46 MW 8.46 MW
937481 AD2-202 C 50/50 0.54 MW 0.54 MW
937482 AD2-202 E 50/50 1.69 MW 1.69 MW
938531 AE1-072 C 50/50 23.83 MW 23.83 MW
938532 AE1-072 E 50/50 12.42 MW 12.42 MW
940481 AE2-033 C 50/50 23.37 MW 23.37 MW
940482 AE2-033 E 50/50 15.76 MW 15.76 MW
940541 AE2-040 C 50/50 4.16 MW 4.16 MW
940641 AE2-051 C 50/50 30.95 MW 30.95 MW
940642 AE2-051 E 50/50 20.64 MW 20.64 MW
941101 AE2-104 C Adder 4.45 MW 3.78 MW
941102 AE2-104 E Adder 7.08 MW 6.01 MW
941281 AE2-122 C 50/50 38.35 MW 38.35 MW
941282 AE2-122 E 50/50 154.74 MW 154.74 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 52.7 MW 52.7 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 35.44 MW 35.44 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 143.26 MW 143.26 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.45 MW 5.45 MW
NY PJM->LTFIMP_NY CLTF 2.51 MW 2.51 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.09 MW 2.09 MW
WEC LTFEXP_WEC->PJM CLTF 1.09 MW 1.09 MW
CPLE LTFEXP_CPLE->PJM CLTF 17.02 MW 17.02 MW
TVA LTFEXP_TVA->PJM CLTF 9.44 MW 9.44 MW
MEC LTFEXP_MEC->PJM CLTF 6.42 MW 6.42 MW
LAGN LTFEXP_LAGN->PJM CLTF 11.95 MW 11.95 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.4 MW 0.4 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 34.7 MW 34.7 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.12 MW 8.12 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 2 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 2 line
314914 to 314918 ckt 2
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 104.42 4094.64 B 4275.43 205.95
Addition
Topology Case Flowgate Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 2 line l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 9.24 MW 9.24 MW
963042 AG1-153 E 50/50 13.87 MW 13.87 MW
964801 AG1-343 C Adder 8.25 MW 7.01 MW
964802 AG1-343 E Adder 6.48 MW 5.51 MW
966811 AG1-552 C Adder 2.86 MW 2.44 MW
966812 AG1-552 E Adder 1.36 MW 1.16 MW
965291 AG1-394 C Adder 1.18 MW 1.0 MW
965292 AG1-394 E Adder 2.17 MW 1.84 MW
966621 AG1-532 C 50/50 1.97 MW 1.97 MW
966622 AG1-532 E 50/50 1.32 MW 1.32 MW
314541 3WATKINS Adder 0.95 MW 0.81 MW
314572 3EMPORIA Adder 0.61 MW 0.52 MW
315153 1CLOVER1 50/50 18.04 MW 18.04 MW
315154 1CLOVER2 50/50 17.88 MW 17.88 MW
918492 AA1-063AE OP Adder 5.67 MW 4.82 MW
919692 AA2-053 E OP Adder 5.88 MW 5.0 MW
920042 AA2-088 E OP Adder 14.64 MW 12.45 MW
942931 AE2-313 C 50/50 60.01 MW 60.01 MW
942932 AE2-313 E 50/50 40.01 MW 40.01 MW
944011 AF1-069 C 50/50 21.59 MW 21.59 MW
944012 AF1-069 E 50/50 8.39 MW 8.39 MW
960081 AF2-299 C 50/50 2.85 MW 2.85 MW
960082 AF2-299 E 50/50 1.9 MW 1.9 MW
900672 V4-068 E Adder 0.49 MW 0.42 MW
923263 AB1-132 E OP Adder 8.56 MW 7.28 MW
923573 AB1-173 E OP Adder 4.6 MW 3.91 MW
940492 AE2-034 E Adder 4.23 MW 3.6 MW
941031 AE2-094 C 50/50 66.08 MW 66.08 MW
941032 AE2-094 E 50/50 29.6 MW 29.6 MW
946281 AF1-292 C 50/50 2.18 MW 2.18 MW
946282 AF1-292 E 50/50 1.45 MW 1.45 MW
957481 AF2-042 C 50/50 84.6 MW 84.6 MW
957482 AF2-042 E 50/50 56.4 MW 56.4 MW
957521 AF2-046 C Adder 21.78 MW 18.51 MW
957522 AF2-046 E Adder 11.01 MW 9.36 MW
314539 3UNCAMP Adder 8.34 MW 7.09 MW
916042 Z1-036 E Adder 39.23 MW 33.35 MW
938771 AE1-103 C Adder 4.01 MW 3.41 MW
938772 AE1-103 E Adder 5.54 MW 4.71 MW
314331 6POE 50/50 1.85 MW 1.85 MW
314507 3THOMPSN Adder 2.73 MW 2.32 MW
314525 6KINGFORK Adder 1.34 MW 1.14 MW
314550 6HICKORY 50/50 2.97 MW 2.97 MW
926662 AC1-147 E Adder 1.79 MW 1.52 MW
926755 AC1-161 E 50/50 17.68 MW 17.68 MW
935112 AD1-144 E Adder 1.24 MW 1.06 MW
942341 AE2-247 C Adder 2.0 MW 1.7 MW
942342 AE2-247 E Adder 2.77 MW 2.35 MW
943461 AF1-017 C Adder 1.81 MW 1.54 MW
943462 AF1-017 E Adder 2.96 MW 2.51 MW
943612 AF1-032 E Adder 1.26 MW 1.07 MW
944871 AF1-152 C Adder 7.21 MW 6.13 MW
944872 AF1-152 E Adder 4.81 MW 4.09 MW
315102 1BRUNSWICKG1 50/50 12.68 MW 12.68 MW
315103 1BRUNSWICKG2 50/50 12.68 MW 12.68 MW
315104 1BRUNSWICKG3 50/50 12.68 MW 12.68 MW
315105 1BRUNSWICKS1 50/50 26.35 MW 26.35 MW
315108 1ELIZAR1 50/50 4.04 MW 4.04 MW
315110 1ELIZAR3 50/50 4.09 MW 4.09 MW
315241 1Z1-086 GT1 50/50 16.21 MW 16.21 MW
315242 1Z1-086 GT2 50/50 16.21 MW 16.21 MW
315243 1Z1-086 GT3 50/50 16.21 MW 16.21 MW
315244 1Z1-086 ST 50/50 28.22 MW 28.22 MW
315260 1GOSPORTA Adder 2.88 MW 2.45 MW
315261 1GOSPORTB Adder 3.68 MW 3.13 MW
315262 1GOSPORTC Adder 3.13 MW 2.66 MW
913392 Y1-086 E Adder 3.0 MW 2.55 MW
916192 Z1-068 E 50/50 2.56 MW 2.56 MW
923832 AB2-022 E Adder 1.69 MW 1.44 MW
923852 AB2-025 E 50/50 1.69 MW 1.69 MW
938552 AE1-074 E Adder 1.59 MW 1.35 MW
957492 AF2-043 E Adder 1.94 MW 1.65 MW
901082 W1-029 E Adder 43.5 MW 36.98 MW
917122 Z2-027 E Adder 1.83 MW 1.56 MW
925522 AC1-027 E 50/50 1.65 MW 1.65 MW
941501 AE2-147 C Adder 21.63 MW 18.39 MW
941502 AE2-147 E Adder 14.42 MW 12.26 MW
957871 AF2-081 C 50/50 13.62 MW 13.62 MW
957872 AF2-081 E 50/50 5.84 MW 5.84 MW
958161 AF2-110 C Adder 1.86 MW 1.58 MW
958162 AF2-110 E Adder 2.95 MW 2.51 MW
926071 AC1-086 C Adder 29.41 MW 25.0 MW
926072 AC1-086 E Adder 13.39 MW 11.38 MW
933291 AC2-141 C 50/50 41.43 MW 41.43 MW
933292 AC2-141 E 50/50 17.68 MW 17.68 MW
939411 AE1-173 C 50/50 142.28 MW 142.28 MW
939412 AE1-173 E 50/50 94.85 MW 94.85 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
962572 AG1-106 E Adder 1.9 MW 1.62 MW
961681 AG1-008 C Adder 21.78 MW 18.51 MW
961682 AG1-008 E Adder 11.01 MW 9.36 MW
962571 AG1-106 C Adder 4.16 MW 3.54 MW
314594 6PLYMOUTH TP Adder 0.44 MW 0.38 MW
314632 6AYDLETT TAP Adder 1.85 MW 1.57 MW
316023 AB2-100 C2 50/50 1.27 MW 1.27 MW
316185 AD1-033 C 50/50 1.56 MW 1.56 MW
316233 AE1-074 C Adder 3.16 MW 2.69 MW
316294 AC1-161 C 50/50 6.29 MW 6.29 MW
316315 AB2-025 C 50/50 0.55 MW 0.55 MW
316316 AC1-027 C 50/50 0.4 MW 0.4 MW
316365 AB2-100 C1 50/50 1.27 MW 1.27 MW
924516 AB2-100 E1 50/50 4.12 MW 4.12 MW
924517 AB2-100 E2 50/50 4.12 MW 4.12 MW
934065 AD1-033 E 50/50 6.83 MW 6.83 MW
937226 AE2-253 E 50/50 7.96 MW 7.96 MW
316017 AA1-139 ULT1 50/50 1.37 MW 1.37 MW
316018 AA1-139 ULT2 50/50 1.37 MW 1.37 MW
919153 AA1-139 E2 50/50 5.57 MW 5.57 MW
919152 AA1-139 E1 50/50 5.57 MW 5.57 MW
920692 AA2-178 E Adder 5.64 MW 4.79 MW
923994 AB2-040_E Adder 8.62 MW 7.33 MW
316084 AB2-161 E Adder 7.29 MW 6.2 MW
316088 AB2-174 E Adder 9.15 MW 7.78 MW
932046 AC2-012 E Adder 17.75 MW 15.09 MW
316311 AC2-079 C Adder 7.71 MW 6.55 MW
932596 AC2-079 E Adder 12.58 MW 10.7 MW
934576 AD1-082 E Adder 5.81 MW 4.94 MW
316349 AD2-085 C Adder 4.62 MW 3.93 MW
936666 AD2-085 E Adder 7.54 MW 6.41 MW
316388 AE2-253 GEN 50/50 2.49 MW 2.49 MW
941591 AE2-156 C Adder 24.26 MW 20.62 MW
944581 AF1-123 C 50/50 62.38 MW 62.38 MW
944582 AF1-123 E 50/50 142.84 MW 142.84 MW
944591 AF1-124 C 50/50 62.6 MW 62.6 MW
944592 AF1-124 E 50/50 143.35 MW 143.35 MW
944601 AF1-125 C 50/50 61.42 MW 61.42 MW
944602 AF1-125 E 50/50 140.59 MW 140.59 MW
965601 AG1-428 C Adder 6.64 MW 5.64 MW
965602 AG1-428 E Adder 4.42 MW 3.76 MW
965811 AG1-449 C 50/50 38.86 MW 38.86 MW
313764 3SOCKMAN Adder 1.0 MW 0.85 MW
934501 AD1-074 C Adder 46.31 MW 39.37 MW
934502 AD1-074 E Adder 1.12 MW 0.95 MW
934611 AD1-087 C 50/50 1.77 MW 1.77 MW
934612 AD1-087 E 50/50 5.51 MW 5.51 MW
935171 AD1-152 C 50/50 1.83 MW 1.83 MW
935172 AD1-152 E 50/50 8.11 MW 8.11 MW
937481 AD2-202 C 50/50 0.52 MW 0.52 MW
937482 AD2-202 E 50/50 1.61 MW 1.61 MW
938531 AE1-072 C Adder 23.96 MW 20.36 MW
938532 AE1-072 E Adder 12.49 MW 10.62 MW
939191 AE1-149 C Adder 13.98 MW 11.88 MW
939192 AE1-149 E Adder 9.32 MW 7.92 MW
940481 AE2-033 C 50/50 23.55 MW 23.55 MW
940482 AE2-033 E 50/50 15.87 MW 15.87 MW
940541 AE2-040 C 50/50 4.19 MW 4.19 MW
940641 AE2-051 C 50/50 28.23 MW 28.23 MW
940642 AE2-051 E 50/50 18.82 MW 18.82 MW
941101 AE2-104 C Adder 4.55 MW 3.87 MW
941102 AE2-104 E Adder 7.24 MW 6.15 MW
941281 AE2-122 C 50/50 38.68 MW 38.68 MW
941282 AE2-122 E 50/50 156.07 MW 156.07 MW
316303 AF2-085 50/50 5.47 MW 5.47 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 54.22 MW 54.22 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 35.64 MW 35.64 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 138.97 MW 138.97 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.96 MW 5.96 MW
NY PJM->LTFIMP_NY CLTF 2.73 MW 2.73 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.16 MW 2.16 MW
WEC LTFEXP_WEC->PJM CLTF 1.12 MW 1.12 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.37 MW 16.37 MW
TVA LTFEXP_TVA->PJM CLTF 9.43 MW 9.43 MW
MEC LTFEXP_MEC->PJM CLTF 6.54 MW 6.54 MW
LAGN LTFEXP_LAGN->PJM CLTF 11.9 MW 11.9 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.41 MW 0.41 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 37.92 MW 37.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.81 MW 7.81 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P1: Midlothian-NorthAnna_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1: Midlothian-NorthAnna_SRT-A
CONTINGENCY 'DVP_P1: Midlothian-NorthAnna_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 2   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 104.42 4094.64 B 4275.43 205.95
Addition
Topology Case Flowgate Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P1: Midlothian-NorthAnna_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 9.24 MW 9.24 MW
963042 AG1-153 E 50/50 13.87 MW 13.87 MW
964801 AG1-343 C Adder 8.25 MW 7.01 MW
964802 AG1-343 E Adder 6.48 MW 5.51 MW
966811 AG1-552 C Adder 2.86 MW 2.44 MW
966812 AG1-552 E Adder 1.36 MW 1.16 MW
965291 AG1-394 C Adder 1.18 MW 1.0 MW
965292 AG1-394 E Adder 2.17 MW 1.84 MW
966621 AG1-532 C 50/50 1.97 MW 1.97 MW
966622 AG1-532 E 50/50 1.32 MW 1.32 MW
314541 3WATKINS Adder 0.95 MW 0.81 MW
314572 3EMPORIA Adder 0.61 MW 0.52 MW
315153 1CLOVER1 50/50 18.04 MW 18.04 MW
315154 1CLOVER2 50/50 17.88 MW 17.88 MW
918492 AA1-063AE OP Adder 5.67 MW 4.82 MW
919692 AA2-053 E OP Adder 5.88 MW 5.0 MW
920042 AA2-088 E OP Adder 14.64 MW 12.45 MW
942931 AE2-313 C 50/50 60.01 MW 60.01 MW
942932 AE2-313 E 50/50 40.01 MW 40.01 MW
944011 AF1-069 C 50/50 21.59 MW 21.59 MW
944012 AF1-069 E 50/50 8.39 MW 8.39 MW
960081 AF2-299 C 50/50 2.85 MW 2.85 MW
960082 AF2-299 E 50/50 1.9 MW 1.9 MW
900672 V4-068 E Adder 0.49 MW 0.42 MW
923263 AB1-132 E OP Adder 8.56 MW 7.28 MW
923573 AB1-173 E OP Adder 4.6 MW 3.91 MW
940492 AE2-034 E Adder 4.23 MW 3.6 MW
941031 AE2-094 C 50/50 66.08 MW 66.08 MW
941032 AE2-094 E 50/50 29.6 MW 29.6 MW
946281 AF1-292 C 50/50 2.18 MW 2.18 MW
946282 AF1-292 E 50/50 1.45 MW 1.45 MW
957481 AF2-042 C 50/50 84.6 MW 84.6 MW
957482 AF2-042 E 50/50 56.4 MW 56.4 MW
957521 AF2-046 C Adder 21.78 MW 18.51 MW
957522 AF2-046 E Adder 11.01 MW 9.36 MW
314539 3UNCAMP Adder 8.34 MW 7.09 MW
916042 Z1-036 E Adder 39.23 MW 33.35 MW
938771 AE1-103 C Adder 4.01 MW 3.41 MW
938772 AE1-103 E Adder 5.54 MW 4.71 MW
314331 6POE 50/50 1.85 MW 1.85 MW
314507 3THOMPSN Adder 2.73 MW 2.32 MW
314525 6KINGFORK Adder 1.34 MW 1.14 MW
314550 6HICKORY 50/50 2.97 MW 2.97 MW
926662 AC1-147 E Adder 1.79 MW 1.52 MW
926755 AC1-161 E 50/50 17.68 MW 17.68 MW
935112 AD1-144 E Adder 1.24 MW 1.06 MW
942341 AE2-247 C Adder 2.0 MW 1.7 MW
942342 AE2-247 E Adder 2.77 MW 2.35 MW
943461 AF1-017 C Adder 1.81 MW 1.54 MW
943462 AF1-017 E Adder 2.96 MW 2.51 MW
943612 AF1-032 E Adder 1.26 MW 1.07 MW
944871 AF1-152 C Adder 7.21 MW 6.13 MW
944872 AF1-152 E Adder 4.81 MW 4.09 MW
315102 1BRUNSWICKG1 50/50 12.68 MW 12.68 MW
315103 1BRUNSWICKG2 50/50 12.68 MW 12.68 MW
315104 1BRUNSWICKG3 50/50 12.68 MW 12.68 MW
315105 1BRUNSWICKS1 50/50 26.35 MW 26.35 MW
315108 1ELIZAR1 50/50 4.04 MW 4.04 MW
315110 1ELIZAR3 50/50 4.09 MW 4.09 MW
315241 1Z1-086 GT1 50/50 16.21 MW 16.21 MW
315242 1Z1-086 GT2 50/50 16.21 MW 16.21 MW
315243 1Z1-086 GT3 50/50 16.21 MW 16.21 MW
315244 1Z1-086 ST 50/50 28.22 MW 28.22 MW
315260 1GOSPORTA Adder 2.88 MW 2.45 MW
315261 1GOSPORTB Adder 3.68 MW 3.13 MW
315262 1GOSPORTC Adder 3.13 MW 2.66 MW
913392 Y1-086 E Adder 3.0 MW 2.55 MW
916192 Z1-068 E 50/50 2.56 MW 2.56 MW
923832 AB2-022 E Adder 1.69 MW 1.44 MW
923852 AB2-025 E 50/50 1.69 MW 1.69 MW
938552 AE1-074 E Adder 1.59 MW 1.35 MW
957492 AF2-043 E Adder 1.94 MW 1.65 MW
901082 W1-029 E Adder 43.5 MW 36.98 MW
917122 Z2-027 E Adder 1.83 MW 1.56 MW
925522 AC1-027 E 50/50 1.65 MW 1.65 MW
941501 AE2-147 C Adder 21.63 MW 18.39 MW
941502 AE2-147 E Adder 14.42 MW 12.26 MW
957871 AF2-081 C 50/50 13.62 MW 13.62 MW
957872 AF2-081 E 50/50 5.84 MW 5.84 MW
958161 AF2-110 C Adder 1.86 MW 1.58 MW
958162 AF2-110 E Adder 2.95 MW 2.51 MW
926071 AC1-086 C Adder 29.41 MW 25.0 MW
926072 AC1-086 E Adder 13.39 MW 11.38 MW
933291 AC2-141 C 50/50 41.43 MW 41.43 MW
933292 AC2-141 E 50/50 17.68 MW 17.68 MW
939411 AE1-173 C 50/50 142.28 MW 142.28 MW
939412 AE1-173 E 50/50 94.85 MW 94.85 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
962572 AG1-106 E Adder 1.9 MW 1.62 MW
961681 AG1-008 C Adder 21.78 MW 18.51 MW
961682 AG1-008 E Adder 11.01 MW 9.36 MW
962571 AG1-106 C Adder 4.16 MW 3.54 MW
314594 6PLYMOUTH TP Adder 0.44 MW 0.38 MW
314632 6AYDLETT TAP Adder 1.85 MW 1.57 MW
316023 AB2-100 C2 50/50 1.27 MW 1.27 MW
316185 AD1-033 C 50/50 1.56 MW 1.56 MW
316233 AE1-074 C Adder 3.16 MW 2.69 MW
316294 AC1-161 C 50/50 6.29 MW 6.29 MW
316315 AB2-025 C 50/50 0.55 MW 0.55 MW
316316 AC1-027 C 50/50 0.4 MW 0.4 MW
316365 AB2-100 C1 50/50 1.27 MW 1.27 MW
924516 AB2-100 E1 50/50 4.12 MW 4.12 MW
924517 AB2-100 E2 50/50 4.12 MW 4.12 MW
934065 AD1-033 E 50/50 6.83 MW 6.83 MW
937226 AE2-253 E 50/50 7.96 MW 7.96 MW
316017 AA1-139 ULT1 50/50 1.37 MW 1.37 MW
316018 AA1-139 ULT2 50/50 1.37 MW 1.37 MW
919153 AA1-139 E2 50/50 5.57 MW 5.57 MW
919152 AA1-139 E1 50/50 5.57 MW 5.57 MW
920692 AA2-178 E Adder 5.64 MW 4.79 MW
923994 AB2-040_E Adder 8.62 MW 7.33 MW
316084 AB2-161 E Adder 7.29 MW 6.2 MW
316088 AB2-174 E Adder 9.15 MW 7.78 MW
932046 AC2-012 E Adder 17.75 MW 15.09 MW
316311 AC2-079 C Adder 7.71 MW 6.55 MW
932596 AC2-079 E Adder 12.58 MW 10.7 MW
934576 AD1-082 E Adder 5.81 MW 4.94 MW
316349 AD2-085 C Adder 4.62 MW 3.93 MW
936666 AD2-085 E Adder 7.54 MW 6.41 MW
316388 AE2-253 GEN 50/50 2.49 MW 2.49 MW
941591 AE2-156 C Adder 24.26 MW 20.62 MW
944581 AF1-123 C 50/50 62.38 MW 62.38 MW
944582 AF1-123 E 50/50 142.84 MW 142.84 MW
944591 AF1-124 C 50/50 62.6 MW 62.6 MW
944592 AF1-124 E 50/50 143.35 MW 143.35 MW
944601 AF1-125 C 50/50 61.42 MW 61.42 MW
944602 AF1-125 E 50/50 140.59 MW 140.59 MW
965601 AG1-428 C Adder 6.64 MW 5.64 MW
965602 AG1-428 E Adder 4.42 MW 3.76 MW
965811 AG1-449 C 50/50 38.86 MW 38.86 MW
313764 3SOCKMAN Adder 1.0 MW 0.85 MW
934501 AD1-074 C Adder 46.31 MW 39.37 MW
934502 AD1-074 E Adder 1.12 MW 0.95 MW
934611 AD1-087 C 50/50 1.77 MW 1.77 MW
934612 AD1-087 E 50/50 5.51 MW 5.51 MW
935171 AD1-152 C 50/50 1.83 MW 1.83 MW
935172 AD1-152 E 50/50 8.11 MW 8.11 MW
937481 AD2-202 C 50/50 0.52 MW 0.52 MW
937482 AD2-202 E 50/50 1.61 MW 1.61 MW
938531 AE1-072 C Adder 23.96 MW 20.36 MW
938532 AE1-072 E Adder 12.49 MW 10.62 MW
939191 AE1-149 C Adder 13.98 MW 11.88 MW
939192 AE1-149 E Adder 9.32 MW 7.92 MW
940481 AE2-033 C 50/50 23.55 MW 23.55 MW
940482 AE2-033 E 50/50 15.87 MW 15.87 MW
940541 AE2-040 C 50/50 4.19 MW 4.19 MW
940641 AE2-051 C 50/50 28.23 MW 28.23 MW
940642 AE2-051 E 50/50 18.82 MW 18.82 MW
941101 AE2-104 C Adder 4.55 MW 3.87 MW
941102 AE2-104 E Adder 7.24 MW 6.15 MW
941281 AE2-122 C 50/50 38.68 MW 38.68 MW
941282 AE2-122 E 50/50 156.07 MW 156.07 MW
316303 AF2-085 50/50 5.47 MW 5.47 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 54.22 MW 54.22 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 35.64 MW 35.64 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 138.97 MW 138.97 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.96 MW 5.96 MW
NY PJM->LTFIMP_NY CLTF 2.73 MW 2.73 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.16 MW 2.16 MW
WEC LTFEXP_WEC->PJM CLTF 1.12 MW 1.12 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.37 MW 16.37 MW
TVA LTFEXP_TVA->PJM CLTF 9.43 MW 9.43 MW
MEC LTFEXP_MEC->PJM CLTF 6.54 MW 6.54 MW
LAGN LTFEXP_LAGN->PJM CLTF 11.9 MW 11.9 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.41 MW 0.41 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 37.92 MW 37.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.81 MW 7.81 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Summer Potential Congestion due to Local Energy Deliverability
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6KINGS M-6PENNIMAN 230.0 kV Ckt 1 line
314386 to 314296 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 100.49 984.18 B 989.02 78.55
DVP 6CHARCTY-6LAKESIDE 230.0 kV Ckt 1 line
314225 to 314227 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 108.48 984.18 B 1067.68 46.31
DVP 6IRON208-6SOUWEST 230.0 kV Ckt 1 line
314309 to 314338 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 126.31 663.64 B 838.26 47.98
DVP 6CHESTF A-6IRON208 230.0 kV Ckt 1 line
314286 to 314309 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 131.62 663.64 B 873.47 48.05
DVP 8CHANCE-8BRISTER 500.0 kV Ckt 1 line
314905 to 314900 ckt 1
DVP_P1-2: LN 594_SRT-S
CONTINGENCY 'DVP_P1-2: LN 594_SRT-S'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
OP AC 104.61 4070.2 B 4257.94 161.81
DVP 6CHCKAHM-6ELKO 230.0 kV Ckt 1 line
314214 to 314258 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 100.74 678.68 B 683.69 50.4
DVP 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 142.35 1058.16 B 1506.29 63.16
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
Base Case OP AC 100.12 4070.2 A 4075.17 175.85
DVP 6SKIFF CREEK-6KINGS M 230.0 kV Ckt 1 line
314209 to 314386 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 103.83 984.18 B 1021.91 78.55
DVP 6NRTHEST-6ELMONT 230.0 kV Ckt 1 line
314236 to 314218 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 130.36 678.68 B 884.72 61.91
DVP 8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line
314911 to 314905 ckt 1
DVP_P1-2: LN 573_SRT-A
CONTINGENCY 'DVP_P1-2: LN 573_SRT-A'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
OP AC 104.67 4070.2 B 4260.16 164.99
DVP 6GARYSVILLE-6HOPEWLL 230.0 kV Ckt 1 line
313902 to 314303 ckt 1
DVP_P1-2: LN 2197_SRT-A-2
CONTINGENCY 'DVP_P1-2: LN 2197_SRT-A-2'
 OPEN BRANCH FROM BUS 935160 TO BUS 314303 CKT 1   /*AD1-151 TP   230.0 - 6HOPEWLL     230.0
END
OP AC 102.27 678.68 B 694.09 56.51
DVP 6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer
314322 to 314914 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 112.54 1058.16 B 1190.85 63.54
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Base Case OP AC 112.87 3220.44 A 3634.93 166.69
DVP 6CHESTF B-6VARINA 230.0 kV Ckt 1 line
314287 to 314260 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 112.12 984.18 B 1103.43 46.31
DVP 6HOPEWLL-6CHESTF A 230.0 kV Ckt 1 line
314303 to 314286 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 102.7 984.18 B 1010.78 62.41
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Base Case OP AC 103.1 3193.18 A 3292.2 164.54
DVP 6SKIFF CREEK-6WALR285 230.0 kV Ckt 1 line
314209 to 314413 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 103.53 678.68 B 702.63 67.98
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
Base Case OP AC 107.11 3220.44 A 3449.34 120.93
DVP 8SEPTA-8SURRY 500.0 kV Ckt 1 line
314923 to 314924 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 120.61 2442.12 B 2945.47 156.64
DVP 6LIGH209-6LANEXA 230.0 kV Ckt 1 line
314391 to 314388 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 130.6 663.64 B 866.7 78.55
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 186.29 663.64 B 1236.32 49.88
DVP 6VARINA-6CHARCTY 230.0 kV Ckt 1 line
314260 to 314225 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 112.08 984.18 B 1103.08 46.31
DVP 8MORRSVL-8LOUDOUN 500.0 kV Ckt 1 line
314916 to 314913 ckt 1
DVP_P1-2: LN 568_SRT-S
CONTINGENCY 'DVP_P1-2: LN 568_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1                /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
END
OP AC 115.98 3220.44 B 3734.98 94.0
DVP AB2-190 TAP-6GARYSVILLE 230.0 kV Ckt 1 line
316099 to 313902 ckt 1
DVP_P1-2: LN 2197_SRT-A-2
CONTINGENCY 'DVP_P1-2: LN 2197_SRT-A-2'
 OPEN BRANCH FROM BUS 935160 TO BUS 314303 CKT 1   /*AD1-151 TP   230.0 - 6HOPEWLL     230.0
END
OP AC 102.3 678.68 B 694.31 56.51

Details for 6KINGS M-6PENNIMAN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6KINGS M-6PENNIMAN 230.0 kV Ckt 1 line
314386 to 314296 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 100.49 984.18 B 989.02 78.55
Elimination
Base Case Details for Eliminated Flowgate 6KINGS M-6PENNIMAN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.19 MW 0.16 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.75 MW 0.64 MW
962332 AG1-082 E Adder 0.5 MW 0.43 MW
962341 AG1-083 C Adder 0.75 MW 0.64 MW
962342 AG1-083 E Adder 0.5 MW 0.43 MW
963041 AG1-153 C Adder 1.56 MW 1.32 MW
963042 AG1-153 E Adder 2.34 MW 1.99 MW
964801 AG1-343 C Adder 2.24 MW 1.9 MW
964802 AG1-343 E Adder 1.76 MW 1.49 MW
966801 AG1-551 C Adder 0.75 MW 0.64 MW
966802 AG1-551 E Adder 0.4 MW 0.34 MW
966811 AG1-552 C Adder 0.62 MW 0.53 MW
966812 AG1-552 E Adder 0.3 MW 0.25 MW
965291 AG1-394 C Adder 0.32 MW 0.27 MW
965292 AG1-394 E Adder 0.59 MW 0.5 MW
314541 3WATKINS Adder 0.28 MW 0.24 MW
918492 AA1-063AE OP Adder 1.35 MW 1.15 MW
918532 AA1-067 E Adder 0.25 MW 0.21 MW
919692 AA2-053 E OP Adder 1.33 MW 1.13 MW
920042 AA2-088 E OP Adder 4.02 MW 3.42 MW
927146 AC1-208 E Adder 1.24 MW 1.05 MW
934521 AD1-076 C Adder 5.16 MW 4.38 MW
934522 AD1-076 E Adder 2.63 MW 2.23 MW
942931 AE2-313 C Adder 10.07 MW 8.56 MW
942932 AE2-313 E Adder 6.71 MW 5.71 MW
943172 AE2-346 E Adder 0.23 MW 0.19 MW
944011 AF1-069 C Adder 3.67 MW 3.12 MW
944012 AF1-069 E Adder 1.42 MW 1.21 MW
316141 AB2-099 E Adder 0.09 MW 0.08 MW
900672 V4-068 E Adder 0.13 MW 0.11 MW
940492 AE2-034 E Adder 1.36 MW 1.16 MW
941031 AE2-094 C Adder 11.22 MW 9.54 MW
941032 AE2-094 E Adder 5.03 MW 4.27 MW
957521 AF2-046 C Adder 5.89 MW 5.01 MW
957522 AF2-046 E Adder 2.98 MW 2.53 MW
957861 AF2-080 C Adder 2.5 MW 2.12 MW
957862 AF2-080 E Adder 1.11 MW 0.94 MW
314539 3UNCAMP Adder 2.57 MW 2.18 MW
916042 Z1-036 E Adder 13.59 MW 11.55 MW
938771 AE1-103 C Adder 1.26 MW 1.07 MW
938772 AE1-103 E Adder 1.74 MW 1.48 MW
314421 6WINCHST 50/50 0.11 MW 0.11 MW
314507 3THOMPSN Adder 1.04 MW 0.88 MW
314525 6KINGFORK Adder 0.55 MW 0.47 MW
314550 6HICKORY Adder 1.12 MW 0.95 MW
315092 1YORKTN3 50/50 139.21 MW 139.21 MW
926662 AC1-147 E Adder 0.68 MW 0.58 MW
926755 AC1-161 E 50/50 7.36 MW 7.36 MW
935112 AD1-144 E Adder 0.51 MW 0.44 MW
942341 AE2-247 C Adder 0.58 MW 0.5 MW
942342 AE2-247 E Adder 0.81 MW 0.69 MW
943461 AF1-017 C Adder 0.53 MW 0.45 MW
943462 AF1-017 E Adder 0.86 MW 0.73 MW
943612 AF1-032 E Adder 0.47 MW 0.4 MW
944871 AF1-152 C Adder 2.6 MW 2.21 MW
944872 AF1-152 E Adder 1.73 MW 1.47 MW
315233 1SURRY 2 50/50 15.21 MW 15.21 MW
315260 1GOSPORTA Adder 1.09 MW 0.93 MW
315261 1GOSPORTB Adder 1.4 MW 1.19 MW
315262 1GOSPORTC Adder 1.18 MW 1.01 MW
913392 Y1-086 E Adder 1.1 MW 0.93 MW
916192 Z1-068 E Adder 0.97 MW 0.82 MW
923832 AB2-022 E Adder 0.62 MW 0.53 MW
939312 AE1-162 E Adder 0.68 MW 0.58 MW
957492 AF2-043 E Adder 0.73 MW 0.62 MW
957601 AF2-054 C Adder -1.41 MW -1.2 MW
962962 AG1-145 E 50/50 0.91 MW 0.91 MW
964211 AG1-282 C Adder -2.23 MW -1.9 MW
901082 W1-029 E Adder 15.66 MW 13.31 MW
917122 Z2-027 E Adder 0.67 MW 0.57 MW
925522 AC1-027 E Adder 0.63 MW 0.53 MW
941501 AE2-147 C Adder 7.79 MW 6.62 MW
941502 AE2-147 E Adder 5.19 MW 4.41 MW
957871 AF2-081 C Adder 5.09 MW 4.33 MW
957872 AF2-081 E Adder 2.18 MW 1.85 MW
958161 AF2-110 C Adder 0.65 MW 0.55 MW
958162 AF2-110 E Adder 1.03 MW 0.87 MW
917512 Z2-088 E OP1 Adder 1.56 MW 1.33 MW
927021 AC1-189 C Adder 2.75 MW 2.34 MW
927022 AC1-189 E Adder 1.37 MW 1.17 MW
933291 AC2-141 C 50/50 17.25 MW 17.25 MW
933292 AC2-141 E 50/50 7.36 MW 7.36 MW
939411 AE1-173 C Adder 34.54 MW 29.36 MW
939412 AE1-173 E Adder 23.03 MW 19.57 MW
933981 AD1-022 C Adder 3.62 MW 3.07 MW
933982 AD1-022 E Adder 1.97 MW 1.67 MW
961681 AG1-008 C Adder 5.89 MW 5.01 MW
961682 AG1-008 E Adder 2.98 MW 2.53 MW
314594 6PLYMOUTH TP Adder 0.14 MW 0.12 MW
314632 6AYDLETT TAP Adder 0.69 MW 0.58 MW
316159 AE1-175 C 50/50 0.23 MW 0.23 MW
316160 AE1-175 E 50/50 0.75 MW 0.75 MW
316210 AC1-098 C Adder 1.97 MW 1.68 MW
316212 AC1-099 C Adder 0.66 MW 0.56 MW
316274 AC1-208 C Adder 2.8 MW 2.38 MW
316294 AC1-161 C 50/50 2.61 MW 2.61 MW
316382 AG1-145 C 50/50 0.21 MW 0.21 MW
917332 KELFORD E Adder 0.58 MW 0.5 MW
926206 AC1-098 E Adder 1.18 MW 1.0 MW
926214 AC1-099 E Adder 0.39 MW 0.33 MW
934065 AD1-033 E Adder 2.59 MW 2.2 MW
937226 AE2-253 E Adder 2.99 MW 2.54 MW
918512 AA1-065 E OP Adder 2.14 MW 1.82 MW
919153 AA1-139 E2 Adder 2.08 MW 1.77 MW
919152 AA1-139 E1 Adder 2.08 MW 1.77 MW
920692 AA2-178 E Adder 1.81 MW 1.54 MW
925122 AB2-169 E Adder 2.21 MW 1.88 MW
932046 AC2-012 E Adder 6.72 MW 5.72 MW
316311 AC2-079 C Adder 2.3 MW 1.96 MW
932596 AC2-079 E Adder 3.76 MW 3.2 MW
316349 AD2-085 C Adder 1.35 MW 1.15 MW
936666 AD2-085 E Adder 2.2 MW 1.87 MW
961611 AG1-000B C Adder 6.39 MW 5.43 MW
941591 AE2-156 C Adder 9.2 MW 7.82 MW
944581 AF1-123 C Adder 23.79 MW 20.22 MW
944582 AF1-123 E Adder 54.48 MW 46.3 MW
944591 AF1-124 C Adder 23.87 MW 20.29 MW
944592 AF1-124 E Adder 54.67 MW 46.47 MW
944601 AF1-125 C Adder 23.42 MW 19.91 MW
944602 AF1-125 E Adder 53.62 MW 45.58 MW
965691 AG1-437 C Adder 4.11 MW 3.49 MW
965692 AG1-437 E Adder 2.74 MW 2.33 MW
965701 AG1-438 C Adder 4.11 MW 3.49 MW
965702 AG1-438 E Adder 2.74 MW 2.33 MW
965711 AG1-439 C Adder 7.5 MW 6.38 MW
965712 AG1-439 E Adder 5.0 MW 4.25 MW
965741 AG1-442 C Adder 2.4 MW 2.04 MW
965751 AG1-443 C Adder 2.4 MW 2.04 MW
965761 AG1-444 C Adder 4.0 MW 3.4 MW
965811 AG1-449 C Adder 6.52 MW 5.54 MW
932631 AC2-084 C Adder 2.11 MW 1.79 MW
932632 AC2-084 E Adder 1.04 MW 0.88 MW
934501 AD1-074 C Adder 14.2 MW 12.07 MW
934502 AD1-074 E Adder 7.23 MW 6.15 MW
934511 AD1-075 C Adder 3.55 MW 3.02 MW
934512 AD1-075 E Adder 1.81 MW 1.54 MW
938531 AE1-072 C Adder 8.92 MW 7.58 MW
938532 AE1-072 E Adder 4.65 MW 3.95 MW
940641 AE2-051 C Adder 5.83 MW 4.96 MW
940642 AE2-051 E Adder 3.89 MW 3.31 MW
941101 AE2-104 C Adder 1.58 MW 1.34 MW
941102 AE2-104 E Adder 2.52 MW 2.14 MW
941281 AE2-122 C Adder 14.64 MW 12.45 MW
941282 AE2-122 E Adder 59.09 MW 50.22 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 7.35 MW 7.35 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 5.41 MW 5.41 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 24.2 MW 24.2 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.85 MW 0.85 MW
NY PJM->LTFIMP_NY CLTF 0.4 MW 0.4 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.29 MW 0.29 MW
WEC LTFEXP_WEC->PJM CLTF 0.15 MW 0.15 MW
CPLE LTFEXP_CPLE->PJM CLTF 2.98 MW 2.98 MW
TVA LTFEXP_TVA->PJM CLTF 1.47 MW 1.47 MW
MEC LTFEXP_MEC->PJM CLTF 0.94 MW 0.94 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.87 MW 1.87 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 5.39 MW 5.39 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.42 MW 1.42 MW

Details for 6CHARCTY-6LAKESIDE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CHARCTY-6LAKESIDE 230.0 kV Ckt 1 line
314225 to 314227 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 108.48 984.18 B 1067.68 46.31
Elimination
Base Case Details for Eliminated Flowgate 6CHARCTY-6LAKESIDE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.18 MW 0.15 MW
961942 AG1-037 E Adder 0.12 MW 0.1 MW
962331 AG1-082 C Adder 0.72 MW 0.62 MW
962332 AG1-082 E Adder 0.48 MW 0.41 MW
962341 AG1-083 C Adder 0.72 MW 0.62 MW
962342 AG1-083 E Adder 0.48 MW 0.41 MW
963041 AG1-153 C Adder 1.89 MW 1.61 MW
963042 AG1-153 E Adder 2.83 MW 2.41 MW
964801 AG1-343 C Adder 2.19 MW 1.86 MW
964802 AG1-343 E Adder 1.72 MW 1.46 MW
966811 AG1-552 C Adder 0.77 MW 0.66 MW
966812 AG1-552 E Adder 0.37 MW 0.31 MW
965291 AG1-394 C Adder 0.31 MW 0.27 MW
965292 AG1-394 E Adder 0.58 MW 0.49 MW
966621 AG1-532 C Adder 0.58 MW 0.5 MW
966622 AG1-532 E Adder 0.39 MW 0.33 MW
314541 3WATKINS Adder 0.25 MW 0.21 MW
314572 3EMPORIA Adder 0.18 MW 0.15 MW
918492 AA1-063AE OP Adder 1.52 MW 1.29 MW
919692 AA2-053 E OP Adder 1.58 MW 1.34 MW
920042 AA2-088 E OP Adder 3.89 MW 3.31 MW
925785 AC1-054 E Adder 1.14 MW 0.97 MW
927146 AC1-208 E Adder 1.44 MW 1.23 MW
934521 AD1-076 C Adder 4.19 MW 3.56 MW
934522 AD1-076 E Adder 2.13 MW 1.81 MW
942931 AE2-313 C Adder 12.24 MW 10.4 MW
942932 AE2-313 E Adder 8.16 MW 6.94 MW
943172 AE2-346 E Adder 0.22 MW 0.18 MW
944011 AF1-069 C Adder 4.46 MW 3.79 MW
944012 AF1-069 E Adder 1.73 MW 1.47 MW
960081 AF2-299 C Adder 0.84 MW 0.72 MW
960082 AF2-299 E Adder 0.56 MW 0.48 MW
316141 AB2-099 E Adder 0.09 MW 0.08 MW
900672 V4-068 E Adder 0.13 MW 0.11 MW
923263 AB1-132 E OP Adder 2.48 MW 2.11 MW
923573 AB1-173 E OP Adder 1.31 MW 1.11 MW
940492 AE2-034 E Adder 1.04 MW 0.89 MW
941031 AE2-094 C Adder 13.63 MW 11.59 MW
941032 AE2-094 E Adder 6.11 MW 5.19 MW
946281 AF1-292 C Adder 0.65 MW 0.55 MW
946282 AF1-292 E Adder 0.43 MW 0.37 MW
957481 AF2-042 C Adder 16.9 MW 14.36 MW
957482 AF2-042 E Adder 11.26 MW 9.57 MW
957521 AF2-046 C Adder 5.73 MW 4.87 MW
957522 AF2-046 E Adder 2.89 MW 2.46 MW
314539 3UNCAMP Adder 2.21 MW 1.88 MW
916042 Z1-036 E Adder 9.49 MW 8.07 MW
938771 AE1-103 C Adder 1.06 MW 0.9 MW
938772 AE1-103 E Adder 1.47 MW 1.25 MW
314331 6POE 50/50 1.05 MW 1.05 MW
314507 3THOMPSN Adder 0.65 MW 0.56 MW
314525 6KINGFORK Adder 0.34 MW 0.29 MW
314550 6HICKORY Adder 0.69 MW 0.59 MW
315065 1CHESTF6 50/50 22.43 MW 22.43 MW
315073 1STONECA 50/50 4.29 MW 4.29 MW
315076 1HOPPOLC 50/50 0.88 MW 0.88 MW
315077 1HOPHCF1 50/50 1.41 MW 1.41 MW
315078 1HOPHCF2 50/50 1.41 MW 1.41 MW
315079 1HOPHCF3 50/50 1.41 MW 1.41 MW
315080 1HOPHCF4 50/50 2.13 MW 2.13 MW
926662 AC1-147 E Adder 0.43 MW 0.36 MW
927226 AC1-216 E Adder 3.91 MW 3.32 MW
935112 AD1-144 E Adder 0.31 MW 0.27 MW
942162 AE2-228 E 50/50 1.56 MW 1.56 MW
942341 AE2-247 C Adder 0.65 MW 0.55 MW
942342 AE2-247 E Adder 0.9 MW 0.77 MW
943461 AF1-017 C Adder 0.59 MW 0.5 MW
943462 AF1-017 E Adder 0.96 MW 0.82 MW
943612 AF1-032 E Adder 0.3 MW 0.26 MW
944871 AF1-152 C Adder 1.73 MW 1.47 MW
944872 AF1-152 E Adder 1.15 MW 0.98 MW
315260 1GOSPORTA Adder 0.69 MW 0.59 MW
315261 1GOSPORTB Adder 0.88 MW 0.75 MW
315262 1GOSPORTC Adder 0.75 MW 0.64 MW
913392 Y1-086 E Adder 0.71 MW 0.6 MW
916192 Z1-068 E Adder 0.6 MW 0.51 MW
923832 AB2-022 E Adder 0.4 MW 0.34 MW
923852 AB2-025 E Adder 0.61 MW 0.52 MW
939312 AE1-162 E Adder 0.54 MW 0.46 MW
946262 AF1-291 E 50/50 1.59 MW 1.59 MW
957492 AF2-043 E Adder 0.47 MW 0.4 MW
901082 W1-029 E Adder 10.44 MW 8.88 MW
917122 Z2-027 E Adder 0.44 MW 0.37 MW
925332 AB2-190 E Adder 4.45 MW 3.79 MW
925522 AC1-027 E Adder 0.39 MW 0.33 MW
941501 AE2-147 C Adder 5.19 MW 4.41 MW
941502 AE2-147 E Adder 3.46 MW 2.94 MW
942001 AE2-212 C 50/50 2.05 MW 2.05 MW
942002 AE2-212 E 50/50 1.37 MW 1.37 MW
957871 AF2-081 C Adder 3.18 MW 2.71 MW
957872 AF2-081 E Adder 1.36 MW 1.16 MW
958161 AF2-110 C Adder 0.49 MW 0.42 MW
958162 AF2-110 E Adder 0.78 MW 0.66 MW
926071 AC1-086 C Adder 8.52 MW 7.25 MW
926072 AC1-086 E Adder 3.88 MW 3.3 MW
939411 AE1-173 C Adder 30.1 MW 25.59 MW
939412 AE1-173 E Adder 20.07 MW 17.06 MW
934011 AD1-025 C Adder 8.54 MW 7.26 MW
934012 AD1-025 E Adder 5.06 MW 4.3 MW
933981 AD1-022 C Adder 3.02 MW 2.57 MW
933982 AD1-022 E Adder 1.65 MW 1.4 MW
962572 AG1-106 E Adder 0.55 MW 0.47 MW
961681 AG1-008 C Adder 5.73 MW 4.87 MW
961682 AG1-008 E Adder 2.89 MW 2.46 MW
962571 AG1-106 C Adder 1.21 MW 1.02 MW
314594 6PLYMOUTH TP Adder 0.11 MW 0.09 MW
314632 6AYDLETT TAP Adder 0.43 MW 0.37 MW
316210 AC1-098 C Adder 2.2 MW 1.87 MW
316212 AC1-099 C Adder 0.74 MW 0.62 MW
316240 AF1-291 C 50/50 2.38 MW 2.38 MW
316274 AC1-208 C Adder 3.25 MW 2.76 MW
316301 AE2-228 C 50/50 2.33 MW 2.33 MW
917332 KELFORD E Adder 0.59 MW 0.5 MW
924516 AB2-100 E1 Adder 1.32 MW 1.12 MW
924517 AB2-100 E2 Adder 1.32 MW 1.12 MW
926206 AC1-098 E Adder 1.31 MW 1.11 MW
926214 AC1-099 E Adder 0.43 MW 0.37 MW
934065 AD1-033 E Adder 1.59 MW 1.35 MW
937226 AE2-253 E Adder 1.86 MW 1.58 MW
963221 AG1-171 C Adder 1.09 MW 0.93 MW
963222 AG1-171 E Adder 0.72 MW 0.62 MW
963231 AG1-172 C Adder 1.09 MW 0.93 MW
963232 AG1-172 E Adder 0.72 MW 0.62 MW
963241 AG1-173 C Adder 1.09 MW 0.93 MW
963242 AG1-173 E Adder 0.72 MW 0.62 MW
918512 AA1-065 E OP Adder 1.96 MW 1.66 MW
919153 AA1-139 E2 Adder 1.3 MW 1.11 MW
919152 AA1-139 E1 Adder 1.3 MW 1.11 MW
919710 AA2-057 E Adder 1.4 MW 1.19 MW
920692 AA2-178 E Adder 1.39 MW 1.18 MW
923994 AB2-040_E Adder 2.45 MW 2.08 MW
924814 AB2-134 E Adder 6.4 MW 5.44 MW
316084 AB2-161 E Adder 3.08 MW 2.62 MW
925122 AB2-169 E Adder 1.96 MW 1.67 MW
316088 AB2-174 E Adder 2.64 MW 2.24 MW
932046 AC2-012 E Adder 4.24 MW 3.6 MW
316311 AC2-079 C Adder 2.45 MW 2.08 MW
932596 AC2-079 E Adder 4.0 MW 3.4 MW
934576 AD1-082 E Adder 2.45 MW 2.08 MW
316349 AD2-085 C Adder 1.5 MW 1.28 MW
936666 AD2-085 E Adder 2.46 MW 2.09 MW
961611 AG1-000B C Adder 6.94 MW 5.89 MW
941591 AE2-156 C Adder 5.78 MW 4.91 MW
942371 AE2-250 C 50/50 5.41 MW 5.41 MW
942372 AE2-250 E 50/50 2.85 MW 2.85 MW
944582 AF1-123 E Adder 32.12 MW 27.3 MW
944591 AF1-124 C Adder 13.59 MW 11.55 MW
944592 AF1-124 E Adder 32.24 MW 27.4 MW
944602 AF1-125 E Adder 31.62 MW 26.87 MW
962271 AG1-075 C 50/50 9.34 MW 9.34 MW
962272 AG1-075 E 50/50 5.69 MW 5.69 MW
965281 AG1-393 C 50/50 1.2 MW 1.2 MW
965282 AG1-393 E 50/50 0.8 MW 0.8 MW
965601 AG1-428 C Adder 1.75 MW 1.49 MW
965602 AG1-428 E Adder 1.17 MW 0.99 MW
965691 AG1-437 C Adder 3.52 MW 2.99 MW
965692 AG1-437 E Adder 2.35 MW 2.0 MW
965701 AG1-438 C Adder 3.52 MW 2.99 MW
965702 AG1-438 E Adder 2.35 MW 2.0 MW
965741 AG1-442 C Adder 2.05 MW 1.75 MW
965751 AG1-443 C Adder 2.05 MW 1.75 MW
965811 AG1-449 C Adder 7.93 MW 6.74 MW
313764 3SOCKMAN Adder 0.28 MW 0.23 MW
932631 AC2-084 C Adder 2.35 MW 2.0 MW
932632 AC2-084 E Adder 1.16 MW 0.98 MW
934321 AD1-056 C Adder 2.32 MW 1.97 MW
934322 AD1-056 E Adder 1.26 MW 1.07 MW
934331 AD1-057 C Adder 1.29 MW 1.1 MW
934332 AD1-057 E Adder 0.67 MW 0.57 MW
934501 AD1-074 C Adder 11.53 MW 9.8 MW
934502 AD1-074 E Adder 5.87 MW 4.99 MW
934511 AD1-075 C Adder 2.88 MW 2.45 MW
934512 AD1-075 E Adder 1.47 MW 1.25 MW
935161 AD1-151 C Adder 8.56 MW 7.28 MW
935162 AD1-151 E Adder 5.71 MW 4.85 MW
938531 AE1-072 C Adder 5.61 MW 4.77 MW
938532 AE1-072 E Adder 2.93 MW 2.49 MW
939191 AE1-149 C 50/50 6.86 MW 6.86 MW
939192 AE1-149 E 50/50 4.57 MW 4.57 MW
940431 AE2-027 C Adder 6.64 MW 5.65 MW
940432 AE2-027 E Adder 4.43 MW 3.77 MW
940481 AE2-033 C Adder 8.34 MW 7.09 MW
940482 AE2-033 E Adder 5.62 MW 4.78 MW
940541 AE2-040 C Adder 1.51 MW 1.28 MW
940641 AE2-051 C Adder 5.84 MW 4.97 MW
940642 AE2-051 E Adder 3.89 MW 3.31 MW
941101 AE2-104 C Adder 1.2 MW 1.02 MW
941102 AE2-104 E Adder 1.91 MW 1.63 MW
941281 AE2-122 C Adder 9.09 MW 7.73 MW
941282 AE2-122 E Adder 36.69 MW 31.19 MW
944641 AF1-129 C 50/50 116.98 MW 116.98 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 9.1 MW 9.1 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.55 MW 6.55 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 28.66 MW 28.66 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.0 MW 1.0 MW
NY PJM->LTFIMP_NY CLTF 0.47 MW 0.47 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.36 MW 0.36 MW
WEC LTFEXP_WEC->PJM CLTF 0.19 MW 0.19 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.5 MW 3.5 MW
TVA LTFEXP_TVA->PJM CLTF 1.77 MW 1.77 MW
MEC LTFEXP_MEC->PJM CLTF 1.15 MW 1.15 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.26 MW 2.26 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.38 MW 6.38 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.67 MW 1.67 MW

Details for 6IRON208-6SOUWEST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6IRON208-6SOUWEST 230.0 kV Ckt 1 line
314309 to 314338 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 126.31 663.64 B 838.26 47.98
Elimination
Base Case Details for Eliminated Flowgate 6IRON208-6SOUWEST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
916042 Z1-036 E Adder 8.67 MW 7.37 MW
938771 AE1-103 C Adder 0.86 MW 0.73 MW
938772 AE1-103 E Adder 1.19 MW 1.01 MW
314309 6IRON208 50/50 1.06 MW 1.06 MW
314507 3THOMPSN Adder 0.68 MW 0.58 MW
314525 6KINGFORK Adder 0.36 MW 0.3 MW
314550 6HICKORY Adder 0.71 MW 0.6 MW
315060 1CHESTF5 50/50 78.51 MW 78.51 MW
315061 1CHESTG7 50/50 4.44 MW 4.44 MW
315062 1CHESTS7 50/50 2.04 MW 2.04 MW
315063 1CHESTG8 50/50 4.37 MW 4.37 MW
315064 1CHESTS8 50/50 2.25 MW 2.25 MW
315073 1STONECA Adder 4.58 MW 3.89 MW
315077 1HOPHCF1 50/50 1.5 MW 1.5 MW
315078 1HOPHCF2 50/50 1.5 MW 1.5 MW
315079 1HOPHCF3 50/50 1.5 MW 1.5 MW
315080 1HOPHCF4 50/50 2.27 MW 2.27 MW
315092 1YORKTN3 Adder 57.22 MW 48.64 MW
925865 AC1-065 E Adder 7.32 MW 6.22 MW
926472 AC1-118 E Adder 0.38 MW 0.33 MW
926662 AC1-147 E Adder 0.45 MW 0.38 MW
926755 AC1-161 E Adder 3.99 MW 3.39 MW
927226 AC1-216 E Adder 4.28 MW 3.64 MW
934392 AD1-063 E Adder 0.49 MW 0.42 MW
935112 AD1-144 E Adder 0.33 MW 0.28 MW
936582 AD2-073 E Adder 0.42 MW 0.35 MW
936591 AD2-074 C Adder 2.38 MW 2.03 MW
936592 AD2-074 E Adder 3.89 MW 3.31 MW
942152 AE2-227 E 50/50 3.76 MW 3.76 MW
942341 AE2-247 C Adder 0.49 MW 0.42 MW
942342 AE2-247 E Adder 0.68 MW 0.58 MW
943461 AF1-017 C Adder 0.44 MW 0.38 MW
943462 AF1-017 E Adder 0.73 MW 0.62 MW
943612 AF1-032 E Adder 0.3 MW 0.26 MW
943741 AF1-042 C Adder 1.25 MW 1.06 MW
943742 AF1-042 E Adder 2.04 MW 1.73 MW
944871 AF1-152 C Adder 1.65 MW 1.4 MW
944872 AF1-152 E Adder 1.1 MW 0.94 MW
961951 AG1-038 C Adder 1.38 MW 1.17 MW
961952 AG1-038 E Adder 1.9 MW 1.62 MW
966661 AG1-536 C Adder 2.29 MW 1.95 MW
966662 AG1-536 E Adder 3.07 MW 2.61 MW
315260 1GOSPORTA Adder 0.72 MW 0.61 MW
315261 1GOSPORTB Adder 0.92 MW 0.78 MW
315262 1GOSPORTC Adder 0.78 MW 0.66 MW
316076 AC2-137 E Adder 0.5 MW 0.42 MW
316078 AC2-138 E Adder 0.39 MW 0.33 MW
316157 AD2-030 E Adder 0.52 MW 0.44 MW
913392 Y1-086 E Adder 0.7 MW 0.59 MW
916192 Z1-068 E Adder 0.62 MW 0.53 MW
923832 AB2-022 E Adder 0.39 MW 0.33 MW
923842 AB2-024 E Adder 0.84 MW 0.71 MW
939312 AE1-162 E Adder 0.6 MW 0.51 MW
957492 AF2-043 E Adder 0.46 MW 0.39 MW
957601 AF2-054 C Adder 0.93 MW 0.79 MW
957602 AF2-054 E Adder 0.62 MW 0.53 MW
962861 AG1-135 C Adder 2.59 MW 2.2 MW
962862 AG1-135 E Adder 1.72 MW 1.47 MW
962962 AG1-145 E Adder 0.64 MW 0.55 MW
962971 AG1-146 C Adder 1.33 MW 1.13 MW
962972 AG1-146 E Adder 0.89 MW 0.75 MW
962981 AG1-147 C Adder 3.1 MW 2.64 MW
962982 AG1-147 E Adder 2.07 MW 1.76 MW
963611 AG1-210 C Adder 0.28 MW 0.23 MW
963612 AG1-210 E Adder 0.41 MW 0.35 MW
964211 AG1-282 C Adder 0.86 MW 0.73 MW
964212 AG1-282 E Adder 0.57 MW 0.49 MW
901082 W1-029 E Adder 9.95 MW 8.46 MW
917122 Z2-027 E Adder 0.42 MW 0.36 MW
925332 AB2-190 E Adder 4.82 MW 4.1 MW
925522 AC1-027 E Adder 0.4 MW 0.34 MW
941501 AE2-147 C Adder 4.95 MW 4.21 MW
941502 AE2-147 E Adder 3.3 MW 2.8 MW
957832 AF2-077 E Adder 0.6 MW 0.51 MW
957871 AF2-081 C Adder 3.22 MW 2.73 MW
957872 AF2-081 E Adder 1.38 MW 1.17 MW
958161 AF2-110 C Adder 0.44 MW 0.37 MW
958162 AF2-110 E Adder 0.7 MW 0.59 MW
313811 6ELKO L286 Adder 0.52 MW 0.44 MW
314181 3NORNECK Adder 0.37 MW 0.31 MW
933291 AC2-141 C Adder 9.35 MW 7.95 MW
933292 AC2-141 E Adder 3.99 MW 3.39 MW
934011 AD1-025 C Adder 9.35 MW 7.95 MW
934012 AD1-025 E Adder 5.54 MW 4.71 MW
313053 6PAPERMILL Adder 3.08 MW 2.62 MW
314632 6AYDLETT TAP Adder 0.43 MW 0.37 MW
316160 AE1-175 E Adder 0.53 MW 0.45 MW
316304 AE2-227 C 50/50 5.64 MW 5.64 MW
926785 AC1-164_E Adder 9.61 MW 8.17 MW
934065 AD1-033 E Adder 1.64 MW 1.39 MW
937226 AE2-253 E Adder 1.89 MW 1.6 MW
939612 AE1-191 E Adder 2.5 MW 2.13 MW
963221 AG1-171 C Adder 1.19 MW 1.01 MW
963222 AG1-171 E Adder 0.79 MW 0.68 MW
963231 AG1-172 C Adder 1.19 MW 1.01 MW
963232 AG1-172 E Adder 0.79 MW 0.68 MW
963241 AG1-173 C Adder 1.19 MW 1.01 MW
963242 AG1-173 E Adder 0.79 MW 0.68 MW
939246 AE1-155 E Adder 3.7 MW 3.15 MW
919153 AA1-139 E2 Adder 1.32 MW 1.12 MW
919152 AA1-139 E1 Adder 1.32 MW 1.12 MW
924814 AB2-134 E Adder 7.01 MW 5.96 MW
316084 AB2-161 E Adder 1.89 MW 1.6 MW
932046 AC2-012 E Adder 4.44 MW 3.77 MW
316311 AC2-079 C Adder 1.88 MW 1.6 MW
932596 AC2-079 E Adder 3.07 MW 2.61 MW
934146 AD1-041 E Adder 1.56 MW 1.33 MW
934576 AD1-082 E Adder 1.5 MW 1.28 MW
316349 AD2-085 C Adder 1.13 MW 0.96 MW
936666 AD2-085 E Adder 1.85 MW 1.57 MW
961611 AG1-000B C Adder 7.77 MW 6.6 MW
941591 AE2-156 C Adder 6.05 MW 5.14 MW
942371 AE2-250 C Adder 2.86 MW 2.44 MW
942372 AE2-250 E Adder 1.51 MW 1.28 MW
944581 AF1-123 C Adder 14.53 MW 12.35 MW
944582 AF1-123 E Adder 33.28 MW 28.29 MW
944591 AF1-124 C Adder 14.58 MW 12.4 MW
944592 AF1-124 E Adder 33.4 MW 28.39 MW
944601 AF1-125 C Adder 14.31 MW 12.16 MW
944602 AF1-125 E Adder 32.76 MW 27.84 MW
944631 AF1-128 C 50/50 49.13 MW 49.13 MW
958261 AF2-120 C Adder 2.66 MW 2.26 MW
958262 AF2-120 E Adder 1.77 MW 1.51 MW
962271 AG1-075 C Adder 4.94 MW 4.2 MW
962272 AG1-075 E Adder 3.01 MW 2.56 MW
965281 AG1-393 C Adder 0.64 MW 0.54 MW
965282 AG1-393 E Adder 0.42 MW 0.36 MW
935161 AD1-151 C Adder 9.31 MW 7.91 MW
935162 AD1-151 E Adder 6.21 MW 5.28 MW
938531 AE1-072 C Adder 5.64 MW 4.79 MW
938532 AE1-072 E Adder 2.94 MW 2.5 MW
939191 AE1-149 C Adder 3.75 MW 3.19 MW
939192 AE1-149 E Adder 2.5 MW 2.12 MW
939602 AE1-190 E Adder 0.63 MW 0.53 MW
940431 AE2-027 C Adder 3.81 MW 3.24 MW
940432 AE2-027 E Adder 2.54 MW 2.16 MW
940551 AE2-041 C Adder 3.26 MW 2.77 MW
941101 AE2-104 C Adder 1.08 MW 0.92 MW
941102 AE2-104 E Adder 1.71 MW 1.46 MW
941281 AE2-122 C Adder 9.42 MW 8.0 MW
941282 AE2-122 E Adder 37.99 MW 32.3 MW
943471 AF1-018 C Adder 3.26 MW 2.77 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.23 MW 1.23 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.08 MW 2.08 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 13.38 MW 13.38 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.63 MW 0.63 MW
NY PJM->LTFIMP_NY CLTF 0.31 MW 0.31 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.06 MW 0.06 MW
WEC LTFEXP_WEC->PJM CLTF 0.03 MW 0.03 MW
CPLE LTFEXP_CPLE->PJM CLTF 1.73 MW 1.73 MW
TVA LTFEXP_TVA->PJM CLTF 0.64 MW 0.64 MW
MEC LTFEXP_MEC->PJM CLTF 0.27 MW 0.27 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.83 MW 0.83 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 4.01 MW 4.01 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.83 MW 0.83 MW

Details for 6CHESTF A-6IRON208 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CHESTF A-6IRON208 230.0 kV Ckt 1 line
314286 to 314309 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 131.62 663.64 B 873.47 48.05
Elimination
Base Case Details for Eliminated Flowgate 6CHESTF A-6IRON208 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
916042 Z1-036 E Adder 8.68 MW 7.38 MW
938771 AE1-103 C Adder 0.86 MW 0.73 MW
938772 AE1-103 E Adder 1.19 MW 1.01 MW
314507 3THOMPSN Adder 0.68 MW 0.58 MW
314525 6KINGFORK Adder 0.36 MW 0.3 MW
314550 6HICKORY Adder 0.71 MW 0.6 MW
315060 1CHESTF5 50/50 78.54 MW 78.54 MW
315061 1CHESTG7 50/50 4.44 MW 4.44 MW
315062 1CHESTS7 50/50 2.04 MW 2.04 MW
315063 1CHESTG8 50/50 4.37 MW 4.37 MW
315064 1CHESTS8 50/50 2.25 MW 2.25 MW
315073 1STONECA 50/50 4.58 MW 4.58 MW
315076 1HOPPOLC 50/50 0.94 MW 0.94 MW
315077 1HOPHCF1 50/50 1.5 MW 1.5 MW
315078 1HOPHCF2 50/50 1.5 MW 1.5 MW
315079 1HOPHCF3 50/50 1.5 MW 1.5 MW
315080 1HOPHCF4 50/50 2.28 MW 2.28 MW
315092 1YORKTN3 Adder 57.28 MW 48.69 MW
925865 AC1-065 E Adder 7.32 MW 6.23 MW
926472 AC1-118 E Adder 0.38 MW 0.33 MW
926662 AC1-147 E Adder 0.45 MW 0.38 MW
926755 AC1-161 E Adder 4.0 MW 3.4 MW
927226 AC1-216 E Adder 4.28 MW 3.64 MW
934392 AD1-063 E Adder 0.49 MW 0.42 MW
935112 AD1-144 E Adder 0.33 MW 0.28 MW
936582 AD2-073 E Adder 0.42 MW 0.35 MW
936591 AD2-074 C Adder 2.39 MW 2.03 MW
936592 AD2-074 E Adder 3.9 MW 3.31 MW
942341 AE2-247 C Adder 0.49 MW 0.42 MW
942342 AE2-247 E Adder 0.68 MW 0.58 MW
943461 AF1-017 C Adder 0.44 MW 0.38 MW
943462 AF1-017 E Adder 0.73 MW 0.62 MW
943612 AF1-032 E Adder 0.3 MW 0.26 MW
943741 AF1-042 C Adder 1.25 MW 1.06 MW
943742 AF1-042 E Adder 2.04 MW 1.73 MW
944871 AF1-152 C Adder 1.65 MW 1.4 MW
944872 AF1-152 E Adder 1.1 MW 0.94 MW
961951 AG1-038 C Adder 1.38 MW 1.17 MW
961952 AG1-038 E Adder 1.91 MW 1.62 MW
966661 AG1-536 C Adder 2.29 MW 1.95 MW
966662 AG1-536 E Adder 3.08 MW 2.62 MW
315260 1GOSPORTA Adder 0.72 MW 0.61 MW
315261 1GOSPORTB Adder 0.92 MW 0.78 MW
315262 1GOSPORTC Adder 0.78 MW 0.67 MW
316076 AC2-137 E Adder 0.5 MW 0.42 MW
316078 AC2-138 E Adder 0.39 MW 0.33 MW
316132 AB2-190 C 50/50 2.35 MW 2.35 MW
316157 AD2-030 E Adder 0.52 MW 0.44 MW
913392 Y1-086 E Adder 0.7 MW 0.59 MW
916192 Z1-068 E Adder 0.62 MW 0.53 MW
923832 AB2-022 E Adder 0.39 MW 0.33 MW
923842 AB2-024 E Adder 0.84 MW 0.71 MW
939312 AE1-162 E Adder 0.6 MW 0.51 MW
957492 AF2-043 E Adder 0.46 MW 0.39 MW
957601 AF2-054 C Adder 0.93 MW 0.79 MW
957602 AF2-054 E Adder 0.62 MW 0.53 MW
962861 AG1-135 C Adder 2.59 MW 2.2 MW
962862 AG1-135 E Adder 1.73 MW 1.47 MW
962962 AG1-145 E Adder 0.64 MW 0.55 MW
962971 AG1-146 C Adder 1.33 MW 1.13 MW
962972 AG1-146 E Adder 0.89 MW 0.75 MW
962981 AG1-147 C Adder 3.11 MW 2.64 MW
962982 AG1-147 E Adder 2.07 MW 1.76 MW
963611 AG1-210 C Adder 0.28 MW 0.23 MW
963612 AG1-210 E Adder 0.41 MW 0.35 MW
964211 AG1-282 C Adder 0.86 MW 0.73 MW
964212 AG1-282 E Adder 0.57 MW 0.49 MW
901082 W1-029 E Adder 9.97 MW 8.47 MW
917122 Z2-027 E Adder 0.42 MW 0.36 MW
925332 AB2-190 E 50/50 4.82 MW 4.82 MW
925522 AC1-027 E Adder 0.4 MW 0.34 MW
941501 AE2-147 C Adder 4.96 MW 4.21 MW
941502 AE2-147 E Adder 3.3 MW 2.81 MW
957832 AF2-077 E Adder 0.6 MW 0.51 MW
957871 AF2-081 C Adder 3.22 MW 2.74 MW
957872 AF2-081 E Adder 1.38 MW 1.17 MW
958161 AF2-110 C Adder 0.44 MW 0.37 MW
958162 AF2-110 E Adder 0.7 MW 0.6 MW
313811 6ELKO L286 Adder 0.52 MW 0.44 MW
314181 3NORNECK Adder 0.37 MW 0.31 MW
933291 AC2-141 C Adder 9.37 MW 7.96 MW
933292 AC2-141 E Adder 4.0 MW 3.4 MW
934011 AD1-025 C Adder 9.36 MW 7.95 MW
934012 AD1-025 E Adder 5.54 MW 4.71 MW
313053 6PAPERMILL Adder 3.09 MW 2.62 MW
314632 6AYDLETT TAP Adder 0.44 MW 0.37 MW
316160 AE1-175 E Adder 0.53 MW 0.45 MW
316304 AE2-227 C Adder -6.36 MW -5.41 MW
926785 AC1-164_E Adder 9.62 MW 8.18 MW
934065 AD1-033 E Adder 1.64 MW 1.39 MW
937226 AE2-253 E Adder 1.89 MW 1.61 MW
939612 AE1-191 E Adder 2.5 MW 2.13 MW
963221 AG1-171 C Adder 1.19 MW 1.01 MW
963222 AG1-171 E Adder 0.8 MW 0.68 MW
963231 AG1-172 C Adder 1.19 MW 1.01 MW
963232 AG1-172 E Adder 0.8 MW 0.68 MW
963241 AG1-173 C Adder 1.19 MW 1.01 MW
963242 AG1-173 E Adder 0.8 MW 0.68 MW
939246 AE1-155 E Adder 3.71 MW 3.15 MW
919153 AA1-139 E2 Adder 1.32 MW 1.12 MW
919152 AA1-139 E1 Adder 1.32 MW 1.12 MW
924814 AB2-134 E Adder 7.01 MW 5.96 MW
316084 AB2-161 E Adder 1.89 MW 1.6 MW
932046 AC2-012 E Adder 4.44 MW 3.77 MW
316311 AC2-079 C Adder 1.89 MW 1.6 MW
932596 AC2-079 E Adder 3.08 MW 2.62 MW
934146 AD1-041 E Adder 1.56 MW 1.33 MW
934576 AD1-082 E Adder 1.5 MW 1.28 MW
316349 AD2-085 C Adder 1.14 MW 0.96 MW
936666 AD2-085 E Adder 1.85 MW 1.57 MW
961611 AG1-000B C Adder 7.78 MW 6.61 MW
941591 AE2-156 C Adder 6.06 MW 5.15 MW
942371 AE2-250 C Adder 2.87 MW 2.44 MW
942372 AE2-250 E Adder 1.51 MW 1.29 MW
944581 AF1-123 C Adder 14.55 MW 12.37 MW
944582 AF1-123 E Adder 33.32 MW 28.32 MW
944591 AF1-124 C Adder 14.6 MW 12.41 MW
944592 AF1-124 E Adder 33.44 MW 28.43 MW
944601 AF1-125 C Adder 14.33 MW 12.18 MW
944602 AF1-125 E Adder 32.8 MW 27.88 MW
944631 AF1-128 C 50/50 49.15 MW 49.15 MW
958261 AF2-120 C Adder 2.66 MW 2.26 MW
958262 AF2-120 E Adder 1.78 MW 1.51 MW
962271 AG1-075 C Adder 4.95 MW 4.21 MW
962272 AG1-075 E Adder 3.02 MW 2.56 MW
965281 AG1-393 C Adder 0.64 MW 0.54 MW
965282 AG1-393 E Adder 0.42 MW 0.36 MW
935161 AD1-151 C 50/50 9.32 MW 9.32 MW
935162 AD1-151 E 50/50 6.21 MW 6.21 MW
938531 AE1-072 C Adder 5.65 MW 4.8 MW
938532 AE1-072 E Adder 2.94 MW 2.5 MW
939191 AE1-149 C Adder 3.75 MW 3.19 MW
939192 AE1-149 E Adder 2.5 MW 2.13 MW
939602 AE1-190 E Adder 0.63 MW 0.53 MW
940431 AE2-027 C Adder 3.82 MW 3.24 MW
940432 AE2-027 E Adder 2.54 MW 2.16 MW
940551 AE2-041 C Adder 3.26 MW 2.77 MW
941101 AE2-104 C Adder 1.08 MW 0.92 MW
941102 AE2-104 E Adder 1.72 MW 1.46 MW
941281 AE2-122 C Adder 9.43 MW 8.01 MW
941282 AE2-122 E Adder 38.04 MW 32.34 MW
943471 AF1-018 C Adder 3.26 MW 2.77 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.36 MW 1.36 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.13 MW 2.13 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 13.46 MW 13.46 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.62 MW 0.62 MW
NY PJM->LTFIMP_NY CLTF 0.3 MW 0.3 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.07 MW 0.07 MW
WEC LTFEXP_WEC->PJM CLTF 0.03 MW 0.03 MW
CPLE LTFEXP_CPLE->PJM CLTF 1.74 MW 1.74 MW
TVA LTFEXP_TVA->PJM CLTF 0.65 MW 0.65 MW
MEC LTFEXP_MEC->PJM CLTF 0.28 MW 0.28 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.84 MW 0.84 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.02 MW 0.02 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.96 MW 3.96 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.83 MW 0.83 MW

Details for 8CHANCE-8BRISTER 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 594_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8CHANCE-8BRISTER 500.0 kV Ckt 1 line
314905 to 314900 ckt 1
DVP_P1-2: LN 594_SRT-S
CONTINGENCY 'DVP_P1-2: LN 594_SRT-S'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
OP AC 104.61 4070.2 B 4257.94 161.81
Elimination
Base Case Details for Eliminated Flowgate 8CHANCE-8BRISTER 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 594_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314229 6MT RD221 50/50 0.13 MW 0.13 MW
314236 6NRTHEST 50/50 0.19 MW 0.19 MW
314331 6POE Adder 1.47 MW 1.25 MW
314507 3THOMPSN Adder 2.18 MW 1.85 MW
314525 6KINGFORK Adder 1.1 MW 0.93 MW
314550 6HICKORY Adder 2.34 MW 1.99 MW
315039 1LDYSMT3 50/50 5.01 MW 5.01 MW
315040 1LDYSMT4 50/50 5.02 MW 5.02 MW
315041 1LDYSMT5 50/50 5.04 MW 5.04 MW
315060 1CHESTF5 Adder 70.66 MW 60.06 MW
315065 1CHESTF6 Adder 21.75 MW 18.49 MW
315073 1STONECA Adder 7.65 MW 6.51 MW
315083 1SPRUNCA Adder 10.13 MW 8.61 MW
315084 1SPRUNCB Adder 10.13 MW 8.61 MW
315092 1YORKTN3 Adder 154.81 MW 131.59 MW
925865 AC1-065 E Adder 18.02 MW 15.32 MW
926412 AC1-112 E 50/50 1.26 MW 1.26 MW
926662 AC1-147 E Adder 1.43 MW 1.22 MW
926755 AC1-161 E Adder 14.05 MW 11.95 MW
927226 AC1-216 E Adder 8.51 MW 7.23 MW
934392 AD1-063 E Adder 1.16 MW 0.99 MW
935112 AD1-144 E Adder 1.02 MW 0.86 MW
942152 AE2-227 E Adder 1.62 MW 1.38 MW
942162 AE2-228 E Adder 1.59 MW 1.35 MW
942341 AE2-247 C Adder 1.61 MW 1.36 MW
942342 AE2-247 E Adder 2.22 MW 1.89 MW
943461 AF1-017 C Adder 1.45 MW 1.24 MW
943462 AF1-017 E Adder 2.37 MW 2.02 MW
943612 AF1-032 E Adder 0.99 MW 0.84 MW
944871 AF1-152 C Adder 5.62 MW 4.77 MW
944872 AF1-152 E Adder 3.26 MW 2.77 MW
960091 AF2-300 C 50/50 2.5 MW 2.5 MW
960092 AF2-300 E 50/50 1.66 MW 1.66 MW
966871 AG1-558 C Adder 2.66 MW 2.27 MW
966872 AG1-558 E Adder 1.34 MW 1.14 MW
966881 AG1-559 C 50/50 2.77 MW 2.77 MW
966882 AG1-559 E 50/50 1.39 MW 1.39 MW
315225 1N ANNA1 50/50 37.41 MW 37.41 MW
315226 1N ANNA2 50/50 37.43 MW 37.43 MW
315260 1GOSPORTA Adder 2.3 MW 1.96 MW
315261 1GOSPORTB Adder 2.94 MW 2.5 MW
315262 1GOSPORTC Adder 2.5 MW 2.12 MW
316076 AC2-137 E Adder 1.49 MW 1.26 MW
316157 AD2-030 E Adder 1.28 MW 1.09 MW
913392 Y1-086 E Adder 2.34 MW 1.99 MW
916192 Z1-068 E Adder 2.03 MW 1.72 MW
923832 AB2-022 E Adder 1.32 MW 1.12 MW
923842 AB2-024 E Adder 1.95 MW 1.65 MW
930122 AB1-027 E 50/50 1.55 MW 1.55 MW
938552 AE1-074 E Adder 1.36 MW 1.16 MW
939312 AE1-162 E Adder 1.56 MW 1.33 MW
946262 AF1-291 E Adder 1.59 MW 1.35 MW
957411 AF2-035 C 50/50 9.98 MW 9.98 MW
957412 AF2-035 E 50/50 4.99 MW 4.99 MW
957492 AF2-043 E Adder 1.53 MW 1.3 MW
957601 AF2-054 C Adder 2.29 MW 1.94 MW
957602 AF2-054 E Adder 1.52 MW 1.3 MW
962962 AG1-145 E Adder 1.59 MW 1.35 MW
963051 AG1-154 C 50/50 4.14 MW 4.14 MW
963052 AG1-154 E 50/50 6.21 MW 6.21 MW
901082 W1-029 E Adder 33.88 MW 28.8 MW
917122 Z2-027 E Adder 1.43 MW 1.22 MW
925332 AB2-190 E Adder 8.92 MW 7.58 MW
925522 AC1-027 E Adder 1.31 MW 1.12 MW
941501 AE2-147 C Adder 16.85 MW 14.32 MW
941502 AE2-147 E Adder 11.23 MW 9.55 MW
942001 AE2-212 C Adder 2.37 MW 2.01 MW
942002 AE2-212 E Adder 1.58 MW 1.34 MW
957832 AF2-077 E Adder 1.55 MW 1.32 MW
957871 AF2-081 C Adder 10.72 MW 9.11 MW
957872 AF2-081 E Adder 4.59 MW 3.9 MW
958161 AF2-110 C Adder 1.47 MW 1.25 MW
958162 AF2-110 E Adder 2.33 MW 1.98 MW
313811 6ELKO L286 Adder 1.55 MW 1.32 MW
933291 AC2-141 C Adder 32.92 MW 27.98 MW
933292 AC2-141 E Adder 14.05 MW 11.95 MW
939411 AE1-173 C Adder 92.25 MW 78.41 MW
939412 AE1-173 E Adder 61.5 MW 52.27 MW
934011 AD1-025 C Adder 18.59 MW 15.8 MW
934012 AD1-025 E Adder 11.01 MW 9.36 MW
927041 AC1-191 C Adder 10.7 MW 9.1 MW
927042 AC1-191 E Adder 5.33 MW 4.53 MW
313053 6PAPERMILL Adder 7.19 MW 6.11 MW
314632 6AYDLETT TAP Adder 1.45 MW 1.23 MW
316004 AC1-112 C 50/50 0.34 MW 0.34 MW
316160 AE1-175 E Adder 1.31 MW 1.12 MW
316233 AE1-074 C Adder 2.7 MW 2.29 MW
316240 AF1-291 C Adder 2.39 MW 2.03 MW
316301 AE2-228 C Adder 2.38 MW 2.03 MW
316304 AE2-227 C Adder 2.44 MW 2.07 MW
316312 AB1-027 C 50/50 0.55 MW 0.55 MW
926785 AC1-164_E Adder 20.16 MW 17.13 MW
934065 AD1-033 E Adder 5.4 MW 4.59 MW
937226 AE2-253 E Adder 6.27 MW 5.33 MW
939612 AE1-191 E Adder 6.16 MW 5.24 MW
963221 AG1-171 C Adder 2.37 MW 2.01 MW
963222 AG1-171 E Adder 1.58 MW 1.34 MW
963231 AG1-172 C Adder 2.37 MW 2.01 MW
963232 AG1-172 E Adder 1.58 MW 1.34 MW
963241 AG1-173 C Adder 2.37 MW 2.01 MW
963242 AG1-173 E Adder 1.58 MW 1.34 MW
926004 AC1-076_E Adder 4.27 MW 3.63 MW
315037 1LDYSMT1 50/50 4.82 MW 4.82 MW
315038 1LDYSMT2 50/50 4.88 MW 4.88 MW
315051 AA1-145 CT1 50/50 5.23 MW 5.23 MW
315052 AA1-145 CT2 50/50 5.23 MW 5.23 MW
316427 AG1-213 C 50/50 0.83 MW 0.83 MW
315043 1FOUR RIVERA 50/50 3.29 MW 3.29 MW
315044 1FOUR RIVERB 50/50 3.29 MW 3.29 MW
315045 1FOUR RIVERC 50/50 4.01 MW 4.01 MW
315046 1FOUR RIVERD 50/50 3.24 MW 3.24 MW
315047 1FOUR RIVERE 50/50 3.24 MW 3.24 MW
315048 1FOUR RIVERF 50/50 3.95 MW 3.95 MW
919153 AA1-139 E2 Adder 4.38 MW 3.73 MW
919152 AA1-139 E1 Adder 4.38 MW 3.73 MW
924814 AB2-134 E Adder 13.94 MW 11.85 MW
316084 AB2-161 E Adder 5.99 MW 5.09 MW
316044 AC1-158 C1 50/50 6.87 MW 6.87 MW
316045 AC1-158 C2 50/50 6.87 MW 6.87 MW
926739 AC1-158 E1 50/50 19.26 MW 19.26 MW
926740 AC1-158 E2 50/50 19.26 MW 19.26 MW
932046 AC2-012 E Adder 14.17 MW 12.04 MW
316311 AC2-079 C Adder 6.17 MW 5.25 MW
932596 AC2-079 E Adder 10.07 MW 8.56 MW
934146 AD1-041 E Adder 3.85 MW 3.27 MW
934576 AD1-082 E Adder 4.78 MW 4.06 MW
316349 AD2-085 C Adder 3.71 MW 3.15 MW
936666 AD2-085 E Adder 6.05 MW 5.14 MW
961611 AG1-000B C Adder 17.46 MW 14.85 MW
941591 AE2-156 C Adder 19.36 MW 16.45 MW
942371 AE2-250 C Adder 10.68 MW 9.08 MW
942372 AE2-250 E Adder 5.64 MW 4.79 MW
944581 AF1-123 C Adder 49.01 MW 41.66 MW
944582 AF1-123 E Adder 112.22 MW 95.39 MW
944591 AF1-124 C Adder 49.18 MW 41.8 MW
944592 AF1-124 E Adder 112.63 MW 95.74 MW
944601 AF1-125 C Adder 48.25 MW 41.02 MW
944602 AF1-125 E Adder 110.46 MW 93.89 MW
944631 AF1-128 C Adder 44.21 MW 37.58 MW
962271 AG1-075 C Adder 18.43 MW 15.66 MW
962272 AG1-075 E Adder 11.23 MW 9.55 MW
965281 AG1-393 C Adder 2.37 MW 2.02 MW
965282 AG1-393 E Adder 1.58 MW 1.34 MW
935161 AD1-151 C Adder 17.8 MW 15.13 MW
935162 AD1-151 E Adder 11.87 MW 10.09 MW
938531 AE1-072 C Adder 18.83 MW 16.0 MW
938532 AE1-072 E Adder 9.82 MW 8.34 MW
939191 AE1-149 C Adder 11.69 MW 9.94 MW
939192 AE1-149 E Adder 7.79 MW 6.62 MW
939261 AE1-157 C 50/50 16.16 MW 16.16 MW
939262 AE1-157 E 50/50 8.76 MW 8.76 MW
939602 AE1-190 E Adder 1.54 MW 1.31 MW
940431 AE2-027 C Adder 14.26 MW 12.12 MW
940432 AE2-027 E Adder 9.51 MW 8.08 MW
940551 AE2-041 C Adder 7.74 MW 6.58 MW
940641 AE2-051 C Adder 17.28 MW 14.69 MW
940642 AE2-051 E Adder 11.52 MW 9.79 MW
941101 AE2-104 C Adder 3.59 MW 3.05 MW
941102 AE2-104 E Adder 5.71 MW 4.85 MW
941281 AE2-122 C Adder 30.68 MW 26.08 MW
941282 AE2-122 E Adder 123.8 MW 105.23 MW
942191 AE2-231 C 50/50 5.49 MW 5.49 MW
942192 AE2-231 E 50/50 3.66 MW 3.66 MW
943471 AF1-018 C Adder 7.74 MW 6.58 MW
944641 AF1-129 C Adder 113.46 MW 96.44 MW
963622 AG1-213 E 50/50 0.83 MW 0.83 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 29.58 MW 29.58 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 22.22 MW 22.22 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 90.48 MW 90.48 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.78 MW 5.78 MW
NY PJM->LTFIMP_NY CLTF 2.74 MW 2.74 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.28 MW 1.28 MW
WEC LTFEXP_WEC->PJM CLTF 0.63 MW 0.63 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.57 MW 10.57 MW
TVA LTFEXP_TVA->PJM CLTF 6.09 MW 6.09 MW
MEC LTFEXP_MEC->PJM CLTF 3.87 MW 3.87 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.61 MW 7.61 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.25 MW 0.25 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.86 MW 36.86 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.04 MW 5.04 MW

Details for 6CHCKAHM-6ELKO 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CHCKAHM-6ELKO 230.0 kV Ckt 1 line
314214 to 314258 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 100.74 678.68 B 683.69 50.4
Elimination
Base Case Details for Eliminated Flowgate 6CHCKAHM-6ELKO 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
916042 Z1-036 E Adder 8.51 MW 7.23 MW
314184 3SHACKLE 50/50 0.32 MW 0.32 MW
314507 3THOMPSN Adder 0.67 MW 0.57 MW
314525 6KINGFORK Adder 0.34 MW 0.29 MW
314550 6HICKORY Adder 0.72 MW 0.61 MW
315034 1NORNECKC1 50/50 0.41 MW 0.41 MW
315060 1CHESTF5 Adder 24.61 MW 20.92 MW
315092 1YORKTN3 Adder 71.7 MW 60.95 MW
925865 AC1-065 E 50/50 10.65 MW 10.65 MW
926412 AC1-112 E Adder 0.38 MW 0.33 MW
926472 AC1-118 E Adder 0.62 MW 0.53 MW
926662 AC1-147 E Adder 0.44 MW 0.37 MW
926755 AC1-161 E Adder 4.75 MW 4.04 MW
934392 AD1-063 E 50/50 0.76 MW 0.76 MW
935112 AD1-144 E Adder 0.32 MW 0.27 MW
936582 AD2-073 E Adder 0.67 MW 0.57 MW
936591 AD2-074 C 50/50 3.65 MW 3.65 MW
936592 AD2-074 E 50/50 5.96 MW 5.96 MW
943612 AF1-032 E Adder 0.3 MW 0.25 MW
943741 AF1-042 C 50/50 1.91 MW 1.91 MW
943742 AF1-042 E 50/50 3.12 MW 3.12 MW
944491 AF1-114 C Adder 2.86 MW 2.43 MW
944492 AF1-114 E Adder 3.95 MW 3.35 MW
944871 AF1-152 C Adder 1.63 MW 1.39 MW
944872 AF1-152 E Adder 1.09 MW 0.93 MW
961951 AG1-038 C 50/50 2.11 MW 2.11 MW
961952 AG1-038 E 50/50 2.92 MW 2.92 MW
966661 AG1-536 C 50/50 3.54 MW 3.54 MW
966662 AG1-536 E 50/50 4.76 MW 4.76 MW
315260 1GOSPORTA Adder 0.71 MW 0.6 MW
315261 1GOSPORTB Adder 0.9 MW 0.77 MW
315262 1GOSPORTC Adder 0.77 MW 0.65 MW
316078 AC2-138 E Adder 0.61 MW 0.52 MW
316156 AD2-030 C 50/50 0.23 MW 0.23 MW
316157 AD2-030 E 50/50 0.77 MW 0.77 MW
913392 Y1-086 E Adder 0.7 MW 0.59 MW
916192 Z1-068 E Adder 0.62 MW 0.53 MW
923832 AB2-022 E Adder 0.39 MW 0.33 MW
923842 AB2-024 E 50/50 1.32 MW 1.32 MW
930122 AB1-027 E Adder 0.47 MW 0.4 MW
939312 AE1-162 E Adder 0.46 MW 0.39 MW
957492 AF2-043 E Adder 0.46 MW 0.39 MW
957601 AF2-054 C 50/50 1.38 MW 1.38 MW
957602 AF2-054 E 50/50 0.92 MW 0.92 MW
962861 AG1-135 C 50/50 4.0 MW 4.0 MW
962862 AG1-135 E 50/50 2.66 MW 2.66 MW
962962 AG1-145 E 50/50 0.94 MW 0.94 MW
962971 AG1-146 C 50/50 2.02 MW 2.02 MW
962972 AG1-146 E 50/50 1.35 MW 1.35 MW
962981 AG1-147 C 50/50 4.72 MW 4.72 MW
962982 AG1-147 E 50/50 3.15 MW 3.15 MW
963611 AG1-210 C Adder 0.44 MW 0.37 MW
963612 AG1-210 E Adder 0.65 MW 0.56 MW
964211 AG1-282 C 50/50 1.37 MW 1.37 MW
964212 AG1-282 E 50/50 0.91 MW 0.91 MW
901082 W1-029 E Adder 9.85 MW 8.37 MW
917122 Z2-027 E Adder 0.42 MW 0.36 MW
925522 AC1-027 E Adder 0.4 MW 0.34 MW
941501 AE2-147 C Adder 4.9 MW 4.16 MW
941502 AE2-147 E Adder 3.26 MW 2.77 MW
957832 AF2-077 E Adder 0.82 MW 0.7 MW
957871 AF2-081 C Adder 3.25 MW 2.76 MW
957872 AF2-081 E Adder 1.39 MW 1.18 MW
957971 AF2-091 C Adder 0.97 MW 0.83 MW
957972 AF2-091 E Adder 1.34 MW 1.14 MW
958161 AF2-110 C Adder 0.4 MW 0.34 MW
958162 AF2-110 E Adder 0.64 MW 0.55 MW
314181 3NORNECK Adder 0.58 MW 0.49 MW
933291 AC2-141 C Adder 11.14 MW 9.46 MW
933292 AC2-141 E Adder 4.75 MW 4.04 MW
313053 6PAPERMILL 50/50 4.84 MW 4.84 MW
314632 6AYDLETT TAP Adder 0.44 MW 0.37 MW
316059 AD1-063 C 50/50 0.17 MW 0.17 MW
316159 AE1-175 C 50/50 0.24 MW 0.24 MW
316160 AE1-175 E 50/50 0.77 MW 0.77 MW
316169 AC1-164 GEN 50/50 5.48 MW 5.48 MW
316314 AB2-024 C 50/50 0.2 MW 0.2 MW
316382 AG1-145 C 50/50 0.21 MW 0.21 MW
926785 AC1-164_E 50/50 16.26 MW 16.26 MW
934065 AD1-033 E Adder 1.66 MW 1.41 MW
937226 AE2-253 E Adder 1.91 MW 1.62 MW
939611 AE1-191 C 50/50 0.82 MW 0.82 MW
939612 AE1-191 E 50/50 3.67 MW 3.67 MW
316201 AC1-065 C 50/50 0.96 MW 0.96 MW
316404 AE1-155 C 50/50 1.3 MW 1.3 MW
939246 AE1-155 E 50/50 5.74 MW 5.74 MW
919153 AA1-139 E2 Adder 1.33 MW 1.13 MW
919152 AA1-139 E1 Adder 1.33 MW 1.13 MW
932046 AC2-012 E Adder 4.35 MW 3.69 MW
316280 AD1-041 C 50/50 0.52 MW 0.52 MW
934146 AD1-041 E 50/50 2.29 MW 2.29 MW
961611 AG1-000B C Adder 4.72 MW 4.01 MW
941591 AE2-156 C Adder 5.95 MW 5.05 MW
944581 AF1-123 C Adder 15.26 MW 12.97 MW
944582 AF1-123 E Adder 34.95 MW 29.71 MW
944591 AF1-124 C Adder 15.32 MW 13.02 MW
944592 AF1-124 E Adder 35.08 MW 29.82 MW
944601 AF1-125 C Adder 15.03 MW 12.77 MW
944602 AF1-125 E Adder 34.4 MW 29.24 MW
944631 AF1-128 C Adder 15.4 MW 13.09 MW
958261 AF2-120 C 50/50 4.12 MW 4.12 MW
958262 AF2-120 E 50/50 2.75 MW 2.75 MW
938531 AE1-072 C Adder 5.69 MW 4.83 MW
938532 AE1-072 E Adder 2.96 MW 2.52 MW
939601 AE1-190 C 50/50 0.2 MW 0.2 MW
939602 AE1-190 E 50/50 0.92 MW 0.92 MW
940551 AE2-041 C 50/50 5.04 MW 5.04 MW
941101 AE2-104 C Adder 0.99 MW 0.84 MW
941102 AE2-104 E Adder 1.58 MW 1.34 MW
941281 AE2-122 C Adder 9.42 MW 8.0 MW
941282 AE2-122 E Adder 38.0 MW 32.3 MW
943471 AF1-018 C 50/50 5.04 MW 5.04 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 2.73 MW 2.73 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.49 MW 2.49 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 12.96 MW 12.96 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.45 MW 0.45 MW
NY PJM->LTFIMP_NY CLTF 0.22 MW 0.22 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.11 MW 0.11 MW
WEC LTFEXP_WEC->PJM CLTF 0.06 MW 0.06 MW
CPLE LTFEXP_CPLE->PJM CLTF 1.64 MW 1.64 MW
TVA LTFEXP_TVA->PJM CLTF 0.71 MW 0.71 MW
MEC LTFEXP_MEC->PJM CLTF 0.39 MW 0.39 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.91 MW 0.91 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.02 MW 0.02 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.88 MW 2.88 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.78 MW 0.78 MW

Details for 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 142.35 1058.16 B 1506.29 63.16
Elimination
Base Case Details for Eliminated Flowgate 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.21 MW 0.18 MW
961942 AG1-037 E Adder 0.14 MW 0.12 MW
962331 AG1-082 C Adder 0.83 MW 0.71 MW
962332 AG1-082 E Adder 0.56 MW 0.47 MW
962341 AG1-083 C Adder 0.83 MW 0.71 MW
962342 AG1-083 E Adder 0.56 MW 0.47 MW
963041 AG1-153 C 50/50 3.73 MW 3.73 MW
963042 AG1-153 E 50/50 5.59 MW 5.59 MW
964801 AG1-343 C Adder 2.41 MW 2.04 MW
964802 AG1-343 E Adder 1.89 MW 1.61 MW
966801 AG1-551 C Adder 0.9 MW 0.76 MW
966802 AG1-551 E Adder 0.47 MW 0.4 MW
966811 AG1-552 C Adder 0.84 MW 0.72 MW
966812 AG1-552 E Adder 0.4 MW 0.34 MW
965291 AG1-394 C Adder 0.34 MW 0.29 MW
965292 AG1-394 E Adder 0.63 MW 0.54 MW
966621 AG1-532 C Adder 0.57 MW 0.48 MW
966622 AG1-532 E Adder 0.38 MW 0.32 MW
314541 3WATKINS Adder 0.27 MW 0.23 MW
314572 3EMPORIA Adder 0.18 MW 0.15 MW
918492 AA1-063AE OP Adder 1.66 MW 1.41 MW
918532 AA1-067 E Adder 0.31 MW 0.26 MW
919692 AA2-053 E OP Adder 1.74 MW 1.48 MW
920042 AA2-088 E OP Adder 4.26 MW 3.62 MW
927146 AC1-208 E Adder 1.69 MW 1.44 MW
934521 AD1-076 C Adder 5.07 MW 4.31 MW
934522 AD1-076 E Adder 2.58 MW 2.2 MW
942931 AE2-313 C 50/50 24.36 MW 24.36 MW
942932 AE2-313 E 50/50 16.24 MW 16.24 MW
943172 AE2-346 E Adder 0.25 MW 0.21 MW
943902 AF1-058 E Adder 0.55 MW 0.47 MW
944011 AF1-069 C 50/50 8.95 MW 8.95 MW
944012 AF1-069 E 50/50 3.48 MW 3.48 MW
960061 AF2-297 C Adder 3.28 MW 2.79 MW
960062 AF2-297 E Adder 2.19 MW 1.86 MW
960081 AF2-299 C Adder 0.82 MW 0.7 MW
960082 AF2-299 E Adder 0.55 MW 0.47 MW
316141 AB2-099 E Adder 0.1 MW 0.09 MW
900672 V4-068 E Adder 0.14 MW 0.12 MW
923263 AB1-132 E OP Adder 2.57 MW 2.19 MW
923573 AB1-173 E OP Adder 1.34 MW 1.14 MW
940492 AE2-034 E Adder 1.27 MW 1.08 MW
941031 AE2-094 C 50/50 27.39 MW 27.39 MW
941032 AE2-094 E 50/50 12.27 MW 12.27 MW
946281 AF1-292 C Adder 0.63 MW 0.53 MW
946282 AF1-292 E Adder 0.42 MW 0.35 MW
957481 AF2-042 C 50/50 30.33 MW 30.33 MW
957482 AF2-042 E 50/50 20.22 MW 20.22 MW
957521 AF2-046 C Adder 6.42 MW 5.46 MW
957522 AF2-046 E Adder 3.25 MW 2.76 MW
957861 AF2-080 C Adder 3.3 MW 2.81 MW
957862 AF2-080 E Adder 1.46 MW 1.25 MW
916042 Z1-036 E Adder 11.7 MW 9.95 MW
314507 3THOMPSN Adder 0.79 MW 0.67 MW
314550 6HICKORY Adder 0.89 MW 0.76 MW
926662 AC1-147 E Adder 0.52 MW 0.44 MW
926755 AC1-161 E Adder 5.66 MW 4.81 MW
943612 AF1-032 E Adder 0.37 MW 0.31 MW
944871 AF1-152 C Adder 2.14 MW 1.82 MW
944872 AF1-152 E Adder 1.43 MW 1.21 MW
315102 1BRUNSWICKG1 50/50 5.1 MW 5.1 MW
315103 1BRUNSWICKG2 50/50 5.1 MW 5.1 MW
315104 1BRUNSWICKG3 50/50 5.1 MW 5.1 MW
315105 1BRUNSWICKS1 50/50 10.59 MW 10.59 MW
315241 1Z1-086 GT1 50/50 6.58 MW 6.58 MW
315242 1Z1-086 GT2 50/50 6.57 MW 6.57 MW
315243 1Z1-086 GT3 50/50 6.57 MW 6.57 MW
315244 1Z1-086 ST 50/50 11.45 MW 11.45 MW
315260 1GOSPORTA Adder 0.84 MW 0.71 MW
315261 1GOSPORTB Adder 1.07 MW 0.91 MW
315262 1GOSPORTC Adder 0.91 MW 0.77 MW
913392 Y1-086 E Adder 0.89 MW 0.76 MW
916192 Z1-068 E Adder 0.75 MW 0.64 MW
923832 AB2-022 E Adder 0.5 MW 0.43 MW
923852 AB2-025 E Adder 0.5 MW 0.42 MW
957492 AF2-043 E Adder 0.57 MW 0.48 MW
901082 W1-029 E Adder 12.91 MW 10.97 MW
917122 Z2-027 E Adder 0.55 MW 0.46 MW
925522 AC1-027 E Adder 0.49 MW 0.41 MW
941501 AE2-147 C Adder 6.42 MW 5.46 MW
941502 AE2-147 E Adder 4.28 MW 3.64 MW
957871 AF2-081 C Adder 4.07 MW 3.46 MW
957872 AF2-081 E Adder 1.74 MW 1.48 MW
926071 AC1-086 C Adder 8.84 MW 7.51 MW
926072 AC1-086 E Adder 4.02 MW 3.42 MW
927021 AC1-189 C Adder 3.64 MW 3.09 MW
927022 AC1-189 E Adder 1.81 MW 1.54 MW
933291 AC2-141 C Adder 13.27 MW 11.28 MW
933292 AC2-141 E Adder 5.66 MW 4.81 MW
939411 AE1-173 C 50/50 55.08 MW 55.08 MW
939412 AE1-173 E 50/50 36.72 MW 36.72 MW
933981 AD1-022 C Adder 3.63 MW 3.09 MW
933982 AD1-022 E Adder 1.98 MW 1.68 MW
962572 AG1-106 E Adder 0.57 MW 0.49 MW
961681 AG1-008 C Adder 6.42 MW 5.46 MW
961682 AG1-008 E Adder 3.25 MW 2.76 MW
962571 AG1-106 C Adder 1.25 MW 1.06 MW
314594 6PLYMOUTH TP Adder 0.13 MW 0.11 MW
314632 6AYDLETT TAP Adder 0.55 MW 0.47 MW
316210 AC1-098 C Adder 2.59 MW 2.2 MW
316212 AC1-099 C Adder 0.87 MW 0.74 MW
316274 AC1-208 C Adder 3.8 MW 3.23 MW
316336 AC2-165 C Adder -11.15 MW -9.47 MW
917332 KELFORD E Adder 0.69 MW 0.58 MW
924516 AB2-100 E1 Adder 1.22 MW 1.04 MW
924517 AB2-100 E2 Adder 1.22 MW 1.04 MW
926206 AC1-098 E Adder 1.54 MW 1.31 MW
926214 AC1-099 E Adder 0.51 MW 0.43 MW
927255 AC1-221 E Adder 1.7 MW 1.44 MW
932763 AC2-100 E Adder 1.15 MW 0.98 MW
934065 AD1-033 E Adder 2.04 MW 1.74 MW
937226 AE2-253 E Adder 2.38 MW 2.02 MW
918512 AA1-065 E OP Adder 2.3 MW 1.96 MW
919153 AA1-139 E2 Adder 1.66 MW 1.42 MW
919152 AA1-139 E1 Adder 1.66 MW 1.42 MW
919710 AA2-057 E Adder 1.7 MW 1.45 MW
920692 AA2-178 E Adder 1.69 MW 1.44 MW
923994 AB2-040_E Adder 2.51 MW 2.13 MW
925122 AB2-169 E Adder 2.42 MW 2.06 MW
316088 AB2-174 E Adder 2.65 MW 2.25 MW
932046 AC2-012 E Adder 5.15 MW 4.38 MW
941591 AE2-156 C Adder 7.06 MW 6.0 MW
944581 AF1-123 C Adder 19.13 MW 16.26 MW
944582 AF1-123 E Adder 43.8 MW 37.23 MW
944591 AF1-124 C Adder 19.2 MW 16.32 MW
944592 AF1-124 E Adder 43.96 MW 37.37 MW
944601 AF1-125 C Adder 18.83 MW 16.01 MW
944602 AF1-125 E Adder 43.11 MW 36.65 MW
965691 AG1-437 C Adder 4.2 MW 3.57 MW
965692 AG1-437 E Adder 2.8 MW 2.38 MW
965701 AG1-438 C Adder 4.2 MW 3.57 MW
965702 AG1-438 E Adder 2.8 MW 2.38 MW
965711 AG1-439 C Adder 10.21 MW 8.68 MW
965712 AG1-439 E Adder 6.81 MW 5.79 MW
965741 AG1-442 C Adder 2.45 MW 2.08 MW
965751 AG1-443 C Adder 2.45 MW 2.08 MW
965761 AG1-444 C Adder 0.3 MW 0.25 MW
965811 AG1-449 C 50/50 15.78 MW 15.78 MW
313764 3SOCKMAN Adder 0.29 MW 0.25 MW
932631 AC2-084 C Adder 2.76 MW 2.35 MW
932632 AC2-084 E Adder 1.36 MW 1.16 MW
934321 AD1-056 C Adder 2.7 MW 2.29 MW
934322 AD1-056 E Adder 1.46 MW 1.24 MW
934331 AD1-057 C Adder 1.5 MW 1.28 MW
934332 AD1-057 E Adder 0.78 MW 0.67 MW
934501 AD1-074 C Adder 13.96 MW 11.87 MW
934502 AD1-074 E Adder 7.11 MW 6.04 MW
934511 AD1-075 C Adder 3.49 MW 2.97 MW
934512 AD1-075 E Adder 1.78 MW 1.51 MW
934612 AD1-087 E Adder 1.9 MW 1.61 MW
935172 AD1-152 E Adder 2.74 MW 2.33 MW
937482 AD2-202 E Adder 0.56 MW 0.47 MW
938531 AE1-072 C Adder 7.16 MW 6.08 MW
938532 AE1-072 E Adder 3.73 MW 3.17 MW
940481 AE2-033 C Adder 6.95 MW 5.91 MW
940482 AE2-033 E Adder 4.69 MW 3.98 MW
940541 AE2-040 C Adder 1.24 MW 1.05 MW
940641 AE2-051 C 50/50 11.56 MW 11.56 MW
940642 AE2-051 E 50/50 7.7 MW 7.7 MW
941281 AE2-122 C Adder 11.42 MW 9.71 MW
941282 AE2-122 E Adder 46.09 MW 39.17 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 14.34 MW 14.34 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.29 MW 10.29 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 45.66 MW 45.66 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.22 MW 1.22 MW
NY PJM->LTFIMP_NY CLTF 0.57 MW 0.57 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.56 MW 0.56 MW
WEC LTFEXP_WEC->PJM CLTF 0.3 MW 0.3 MW
CPLE LTFEXP_CPLE->PJM CLTF 5.53 MW 5.53 MW
TVA LTFEXP_TVA->PJM CLTF 2.79 MW 2.79 MW
MEC LTFEXP_MEC->PJM CLTF 1.8 MW 1.8 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.56 MW 3.56 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.11 MW 0.11 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.75 MW 7.75 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.64 MW 2.64 MW

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
Base Case OP AC 100.12 4070.2 A 4075.17 175.85
Elimination
Base Case Details for Eliminated Flowgate 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
964801 AG1-343 C Adder 6.22 MW 5.29 MW
964802 AG1-343 E Adder 4.89 MW 4.16 MW
965291 AG1-394 C Adder 0.89 MW 0.76 MW
965292 AG1-394 E Adder 1.64 MW 1.39 MW
314541 3WATKINS Adder 0.75 MW 0.64 MW
920042 AA2-088 E OP Adder 11.12 MW 9.45 MW
934521 AD1-076 C Adder 13.16 MW 11.19 MW
934522 AD1-076 E Adder 6.71 MW 5.7 MW
900672 V4-068 E Adder 0.37 MW 0.32 MW
940492 AE2-034 E Adder 3.38 MW 2.87 MW
314539 3UNCAMP Adder 6.68 MW 5.68 MW
916042 Z1-036 E Adder 32.37 MW 27.51 MW
938771 AE1-103 C Adder 3.25 MW 2.76 MW
938772 AE1-103 E Adder 4.49 MW 3.81 MW
314229 6MT RD221 50/50 0.17 MW 0.17 MW
314236 6NRTHEST 50/50 0.24 MW 0.24 MW
314331 6POE Adder 1.51 MW 1.28 MW
314507 3THOMPSN Adder 2.39 MW 2.03 MW
314525 6KINGFORK Adder 1.21 MW 1.03 MW
314550 6HICKORY Adder 2.55 MW 2.17 MW
315060 1CHESTF5 50/50 89.22 MW 89.22 MW
315061 1CHESTG7 50/50 5.05 MW 5.05 MW
315062 1CHESTS7 50/50 2.32 MW 2.32 MW
315063 1CHESTG8 50/50 4.97 MW 4.97 MW
315064 1CHESTS8 50/50 2.56 MW 2.56 MW
315065 1CHESTF6 Adder 24.7 MW 20.99 MW
315067 1DARBY 1 50/50 3.41 MW 3.41 MW
315068 1DARBY 2 50/50 3.41 MW 3.41 MW
315069 1DARBY 3 50/50 3.42 MW 3.42 MW
315070 1DARBY 4 50/50 3.43 MW 3.43 MW
315073 1STONECA Adder 9.04 MW 7.68 MW
315083 1SPRUNCA Adder 10.97 MW 9.33 MW
315084 1SPRUNCB Adder 10.97 MW 9.33 MW
315092 1YORKTN3 Adder 188.52 MW 160.24 MW
925865 AC1-065 E Adder 22.68 MW 19.28 MW
926412 AC1-112 E 50/50 1.74 MW 1.74 MW
926662 AC1-147 E Adder 1.57 MW 1.33 MW
926755 AC1-161 E Adder 15.53 MW 13.2 MW
927226 AC1-216 E Adder 9.89 MW 8.41 MW
934392 AD1-063 E Adder 1.48 MW 1.26 MW
934782 AD1-105 E Adder 5.29 MW 4.5 MW
935112 AD1-144 E Adder 1.13 MW 0.96 MW
936591 AD2-074 C Adder 7.04 MW 5.98 MW
936592 AD2-074 E Adder 11.48 MW 9.76 MW
942152 AE2-227 E Adder 1.99 MW 1.69 MW
942162 AE2-228 E Adder 1.78 MW 1.51 MW
942341 AE2-247 C Adder 1.73 MW 1.47 MW
942342 AE2-247 E Adder 2.39 MW 2.03 MW
943461 AF1-017 C Adder 1.57 MW 1.33 MW
943462 AF1-017 E Adder 2.56 MW 2.17 MW
943612 AF1-032 E Adder 1.08 MW 0.92 MW
943741 AF1-042 C Adder 3.68 MW 3.13 MW
943742 AF1-042 E Adder 6.01 MW 5.11 MW
944871 AF1-152 C Adder 6.05 MW 5.14 MW
944872 AF1-152 E Adder 4.03 MW 3.43 MW
961951 AG1-038 C Adder 4.07 MW 3.46 MW
961952 AG1-038 E Adder 5.62 MW 4.78 MW
966661 AG1-536 C Adder 6.66 MW 5.67 MW
966662 AG1-536 E Adder 8.96 MW 7.61 MW
966871 AG1-558 C 50/50 3.42 MW 3.42 MW
966872 AG1-558 E 50/50 1.72 MW 1.72 MW
315216 1CUNINGA 50/50 7.39 MW 7.39 MW
315217 1CUNINGB 50/50 7.39 MW 7.39 MW
315218 1CUNINGC 50/50 7.39 MW 7.39 MW
315219 1CUNINGD 50/50 16.54 MW 16.54 MW
315260 1GOSPORTA Adder 2.52 MW 2.14 MW
315261 1GOSPORTB Adder 3.22 MW 2.73 MW
315262 1GOSPORTC Adder 2.73 MW 2.32 MW
316075 AC2-137 C 50/50 0.53 MW 0.53 MW
316076 AC2-137 E 50/50 2.01 MW 2.01 MW
316078 AC2-138 E Adder 1.1 MW 0.93 MW
316157 AD2-030 E Adder 1.6 MW 1.36 MW
913392 Y1-086 E Adder 2.54 MW 2.16 MW
916192 Z1-068 E Adder 2.21 MW 1.88 MW
923832 AB2-022 E Adder 1.43 MW 1.22 MW
923842 AB2-024 E Adder 2.52 MW 2.14 MW
930122 AB1-027 E 50/50 2.14 MW 2.14 MW
938552 AE1-074 E Adder 1.25 MW 1.06 MW
939312 AE1-162 E Adder 1.76 MW 1.5 MW
946262 AF1-291 E Adder 1.79 MW 1.52 MW
957492 AF2-043 E Adder 1.66 MW 1.41 MW
957601 AF2-054 C Adder 2.85 MW 2.42 MW
957602 AF2-054 E Adder 1.9 MW 1.61 MW
962861 AG1-135 C Adder 7.56 MW 6.42 MW
962862 AG1-135 E Adder 5.04 MW 4.28 MW
962962 AG1-145 E 50/50 2.04 MW 2.04 MW
962971 AG1-146 C Adder 3.95 MW 3.36 MW
962972 AG1-146 E Adder 2.63 MW 2.24 MW
962981 AG1-147 C Adder 9.22 MW 7.84 MW
962982 AG1-147 E Adder 6.15 MW 5.22 MW
963611 AG1-210 C Adder 0.78 MW 0.67 MW
963612 AG1-210 E Adder 1.18 MW 1.0 MW
964211 AG1-282 C Adder 2.45 MW 2.08 MW
964212 AG1-282 E Adder 1.63 MW 1.39 MW
901082 W1-029 E Adder 36.51 MW 31.04 MW
917122 Z2-027 E Adder 1.54 MW 1.31 MW
925332 AB2-190 E Adder 10.43 MW 8.87 MW
925522 AC1-027 E Adder 1.43 MW 1.22 MW
941501 AE2-147 C Adder 18.16 MW 15.43 MW
941502 AE2-147 E Adder 12.1 MW 10.29 MW
942001 AE2-212 C Adder 2.57 MW 2.18 MW
942002 AE2-212 E Adder 1.71 MW 1.46 MW
957832 AF2-077 E Adder 1.91 MW 1.62 MW
957871 AF2-081 C Adder 11.64 MW 9.89 MW
957872 AF2-081 E Adder 4.99 MW 4.24 MW
958161 AF2-110 C Adder 1.58 MW 1.35 MW
958162 AF2-110 E Adder 2.52 MW 2.14 MW
313811 6ELKO L286 50/50 2.1 MW 2.1 MW
314181 3NORNECK Adder 1.04 MW 0.89 MW
933291 AC2-141 C Adder 36.38 MW 30.92 MW
933292 AC2-141 E Adder 15.53 MW 13.2 MW
939411 AE1-173 C Adder 13.9 MW 11.82 MW
934011 AD1-025 C Adder 21.62 MW 18.38 MW
934012 AD1-025 E Adder 12.81 MW 10.89 MW
927041 AC1-191 C 50/50 13.71 MW 13.71 MW
927042 AC1-191 E 50/50 6.83 MW 6.83 MW
933981 AD1-022 C Adder 9.35 MW 7.95 MW
933982 AD1-022 E Adder 5.09 MW 4.33 MW
313053 6PAPERMILL Adder 9.27 MW 7.88 MW
314594 6PLYMOUTH TP Adder 0.35 MW 0.3 MW
314632 6AYDLETT TAP Adder 1.58 MW 1.34 MW
316004 AC1-112 C 50/50 0.47 MW 0.47 MW
316159 AE1-175 C 50/50 0.52 MW 0.52 MW
316160 AE1-175 E 50/50 1.69 MW 1.69 MW
316169 AC1-164 GEN 50/50 9.48 MW 9.48 MW
316233 AE1-074 C Adder 2.48 MW 2.11 MW
316240 AF1-291 C Adder 2.68 MW 2.28 MW
316301 AE2-228 C Adder 2.67 MW 2.27 MW
316304 AE2-227 C Adder 2.98 MW 2.53 MW
316312 AB1-027 C 50/50 0.76 MW 0.76 MW
316382 AG1-145 C 50/50 0.47 MW 0.47 MW
926785 AC1-164_E 50/50 28.11 MW 28.11 MW
934065 AD1-033 E Adder 5.88 MW 5.0 MW
937226 AE2-253 E Adder 6.81 MW 5.79 MW
939612 AE1-191 E Adder 7.71 MW 6.56 MW
963221 AG1-171 C Adder 2.75 MW 2.34 MW
963222 AG1-171 E Adder 1.84 MW 1.56 MW
963231 AG1-172 C Adder 2.75 MW 2.34 MW
963232 AG1-172 E Adder 1.84 MW 1.56 MW
963241 AG1-173 C Adder 2.75 MW 2.34 MW
963242 AG1-173 E Adder 1.84 MW 1.56 MW
939246 AE1-155 E Adder 10.79 MW 9.17 MW
919153 AA1-139 E2 Adder 4.76 MW 4.04 MW
919152 AA1-139 E1 Adder 4.76 MW 4.04 MW
920692 AA2-178 E Adder 4.5 MW 3.83 MW
924814 AB2-134 E Adder 16.21 MW 13.78 MW
316084 AB2-161 E Adder 6.46 MW 5.49 MW
932046 AC2-012 E Adder 15.5 MW 13.18 MW
316311 AC2-079 C Adder 6.66 MW 5.66 MW
932596 AC2-079 E Adder 10.86 MW 9.23 MW
934146 AD1-041 E Adder 4.82 MW 4.1 MW
934576 AD1-082 E Adder 5.14 MW 4.37 MW
316349 AD2-085 C Adder 4.0 MW 3.4 MW
936666 AD2-085 E Adder 6.52 MW 5.54 MW
961611 AG1-000B C Adder 20.12 MW 17.1 MW
941591 AE2-156 C Adder 21.18 MW 18.0 MW
942371 AE2-250 C Adder 11.87 MW 10.09 MW
942372 AE2-250 E Adder 6.27 MW 5.33 MW
944581 AF1-123 C Adder 53.26 MW 45.27 MW
944582 AF1-123 E Adder 121.96 MW 103.67 MW
944591 AF1-124 C Adder 53.45 MW 45.43 MW
944592 AF1-124 E Adder 122.4 MW 104.04 MW
944601 AF1-125 C Adder 52.44 MW 44.57 MW
944602 AF1-125 E Adder 120.05 MW 102.04 MW
944631 AF1-128 C Adder 55.82 MW 47.45 MW
958261 AF2-120 C Adder 7.75 MW 6.59 MW
958262 AF2-120 E Adder 5.17 MW 4.39 MW
962271 AG1-075 C Adder 20.49 MW 17.42 MW
962272 AG1-075 E Adder 12.49 MW 10.62 MW
965281 AG1-393 C Adder 2.64 MW 2.24 MW
965282 AG1-393 E Adder 1.76 MW 1.5 MW
965691 AG1-437 C Adder 10.74 MW 9.13 MW
965692 AG1-437 E Adder 7.16 MW 6.09 MW
965701 AG1-438 C Adder 10.74 MW 9.13 MW
965702 AG1-438 E Adder 7.16 MW 6.09 MW
965741 AG1-442 C Adder 6.27 MW 5.33 MW
965751 AG1-443 C Adder 6.27 MW 5.33 MW
934501 AD1-074 C Adder 36.25 MW 30.81 MW
934502 AD1-074 E Adder 18.45 MW 15.68 MW
934511 AD1-075 C Adder 9.06 MW 7.7 MW
934512 AD1-075 E Adder 4.61 MW 3.92 MW
935161 AD1-151 C Adder 20.77 MW 17.66 MW
935162 AD1-151 E Adder 13.85 MW 11.77 MW
938531 AE1-072 C Adder 20.43 MW 17.36 MW
938532 AE1-072 E Adder 10.65 MW 9.05 MW
939191 AE1-149 C Adder 12.58 MW 10.69 MW
939192 AE1-149 E Adder 8.38 MW 7.13 MW
939602 AE1-190 E Adder 1.93 MW 1.64 MW
940431 AE2-027 C Adder 16.02 MW 13.62 MW
940432 AE2-027 E Adder 10.68 MW 9.08 MW
940551 AE2-041 C Adder 9.86 MW 8.38 MW
941101 AE2-104 C Adder 3.88 MW 3.3 MW
941102 AE2-104 E Adder 6.17 MW 5.24 MW
941281 AE2-122 C Adder 33.47 MW 28.45 MW
941282 AE2-122 E Adder 135.05 MW 114.79 MW
943471 AF1-018 C Adder 9.86 MW 8.38 MW
944641 AF1-129 C Adder 128.8 MW 109.48 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 60.04 MW 60.04 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 33.07 MW 33.07 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 97.13 MW 97.13 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 6.77 MW 6.77 MW
NY PJM->LTFIMP_NY CLTF 3.02 MW 3.02 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.39 MW 2.39 MW
WEC LTFEXP_WEC->PJM CLTF 1.23 MW 1.23 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.61 MW 10.61 MW
TVA LTFEXP_TVA->PJM CLTF 8.3 MW 8.3 MW
MEC LTFEXP_MEC->PJM CLTF 6.67 MW 6.67 MW
LAGN LTFEXP_LAGN->PJM CLTF 10.29 MW 10.29 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.44 MW 0.44 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 42.99 MW 42.99 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.07 MW 5.07 MW

Details for 6SKIFF CREEK-6KINGS M 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6SKIFF CREEK-6KINGS M 230.0 kV Ckt 1 line
314209 to 314386 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 103.83 984.18 B 1021.91 78.55
Elimination
Base Case Details for Eliminated Flowgate 6SKIFF CREEK-6KINGS M 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.19 MW 0.16 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.75 MW 0.64 MW
962332 AG1-082 E Adder 0.5 MW 0.43 MW
962341 AG1-083 C Adder 0.75 MW 0.64 MW
962342 AG1-083 E Adder 0.5 MW 0.43 MW
963041 AG1-153 C Adder 1.56 MW 1.32 MW
963042 AG1-153 E Adder 2.34 MW 1.99 MW
964801 AG1-343 C Adder 2.24 MW 1.9 MW
964802 AG1-343 E Adder 1.76 MW 1.49 MW
966801 AG1-551 C Adder 0.75 MW 0.64 MW
966802 AG1-551 E Adder 0.4 MW 0.34 MW
966811 AG1-552 C Adder 0.62 MW 0.53 MW
966812 AG1-552 E Adder 0.3 MW 0.25 MW
965291 AG1-394 C Adder 0.32 MW 0.27 MW
965292 AG1-394 E Adder 0.59 MW 0.5 MW
314541 3WATKINS Adder 0.28 MW 0.24 MW
918492 AA1-063AE OP Adder 1.35 MW 1.15 MW
918532 AA1-067 E Adder 0.25 MW 0.21 MW
919692 AA2-053 E OP Adder 1.33 MW 1.13 MW
920042 AA2-088 E OP Adder 4.02 MW 3.42 MW
927146 AC1-208 E Adder 1.24 MW 1.05 MW
934521 AD1-076 C Adder 5.16 MW 4.38 MW
934522 AD1-076 E Adder 2.63 MW 2.23 MW
942931 AE2-313 C Adder 10.07 MW 8.56 MW
942932 AE2-313 E Adder 6.71 MW 5.71 MW
943172 AE2-346 E Adder 0.23 MW 0.19 MW
944011 AF1-069 C Adder 3.67 MW 3.12 MW
944012 AF1-069 E Adder 1.42 MW 1.21 MW
316141 AB2-099 E Adder 0.09 MW 0.08 MW
900672 V4-068 E Adder 0.13 MW 0.11 MW
940492 AE2-034 E Adder 1.36 MW 1.16 MW
941031 AE2-094 C Adder 11.22 MW 9.54 MW
941032 AE2-094 E Adder 5.03 MW 4.27 MW
957521 AF2-046 C Adder 5.89 MW 5.01 MW
957522 AF2-046 E Adder 2.98 MW 2.53 MW
957861 AF2-080 C Adder 2.5 MW 2.12 MW
957862 AF2-080 E Adder 1.11 MW 0.94 MW
314539 3UNCAMP Adder 2.57 MW 2.18 MW
916042 Z1-036 E Adder 13.59 MW 11.55 MW
938771 AE1-103 C Adder 1.26 MW 1.07 MW
938772 AE1-103 E Adder 1.74 MW 1.48 MW
314421 6WINCHST 50/50 0.11 MW 0.11 MW
314507 3THOMPSN Adder 1.04 MW 0.88 MW
314525 6KINGFORK Adder 0.55 MW 0.47 MW
314550 6HICKORY Adder 1.12 MW 0.95 MW
315092 1YORKTN3 50/50 139.21 MW 139.21 MW
926662 AC1-147 E Adder 0.68 MW 0.58 MW
926755 AC1-161 E 50/50 7.36 MW 7.36 MW
935112 AD1-144 E Adder 0.51 MW 0.44 MW
942341 AE2-247 C Adder 0.58 MW 0.5 MW
942342 AE2-247 E Adder 0.81 MW 0.69 MW
943461 AF1-017 C Adder 0.53 MW 0.45 MW
943462 AF1-017 E Adder 0.86 MW 0.73 MW
943612 AF1-032 E Adder 0.47 MW 0.4 MW
944871 AF1-152 C Adder 2.6 MW 2.21 MW
944872 AF1-152 E Adder 1.73 MW 1.47 MW
315233 1SURRY 2 50/50 15.21 MW 15.21 MW
315260 1GOSPORTA Adder 1.09 MW 0.93 MW
315261 1GOSPORTB Adder 1.4 MW 1.19 MW
315262 1GOSPORTC Adder 1.18 MW 1.01 MW
913392 Y1-086 E Adder 1.1 MW 0.93 MW
916192 Z1-068 E Adder 0.97 MW 0.82 MW
923832 AB2-022 E Adder 0.62 MW 0.53 MW
939312 AE1-162 E Adder 0.68 MW 0.58 MW
957492 AF2-043 E Adder 0.73 MW 0.62 MW
957601 AF2-054 C Adder -1.41 MW -1.2 MW
962962 AG1-145 E 50/50 0.91 MW 0.91 MW
964211 AG1-282 C Adder -2.23 MW -1.9 MW
901082 W1-029 E Adder 15.66 MW 13.31 MW
917122 Z2-027 E Adder 0.67 MW 0.57 MW
925522 AC1-027 E Adder 0.63 MW 0.53 MW
941501 AE2-147 C Adder 7.79 MW 6.62 MW
941502 AE2-147 E Adder 5.19 MW 4.41 MW
957871 AF2-081 C Adder 5.09 MW 4.33 MW
957872 AF2-081 E Adder 2.18 MW 1.85 MW
958161 AF2-110 C Adder 0.65 MW 0.55 MW
958162 AF2-110 E Adder 1.03 MW 0.87 MW
917512 Z2-088 E OP1 Adder 1.56 MW 1.33 MW
927021 AC1-189 C Adder 2.75 MW 2.34 MW
927022 AC1-189 E Adder 1.37 MW 1.17 MW
933291 AC2-141 C 50/50 17.25 MW 17.25 MW
933292 AC2-141 E 50/50 7.36 MW 7.36 MW
939411 AE1-173 C Adder 34.54 MW 29.36 MW
939412 AE1-173 E Adder 23.03 MW 19.57 MW
933981 AD1-022 C Adder 3.62 MW 3.07 MW
933982 AD1-022 E Adder 1.97 MW 1.67 MW
961681 AG1-008 C Adder 5.89 MW 5.01 MW
961682 AG1-008 E Adder 2.98 MW 2.53 MW
314594 6PLYMOUTH TP Adder 0.14 MW 0.12 MW
314632 6AYDLETT TAP Adder 0.69 MW 0.58 MW
316159 AE1-175 C 50/50 0.23 MW 0.23 MW
316160 AE1-175 E 50/50 0.75 MW 0.75 MW
316210 AC1-098 C Adder 1.97 MW 1.68 MW
316212 AC1-099 C Adder 0.66 MW 0.56 MW
316274 AC1-208 C Adder 2.8 MW 2.38 MW
316294 AC1-161 C 50/50 2.61 MW 2.61 MW
316382 AG1-145 C 50/50 0.21 MW 0.21 MW
917332 KELFORD E Adder 0.58 MW 0.5 MW
926206 AC1-098 E Adder 1.18 MW 1.0 MW
926214 AC1-099 E Adder 0.39 MW 0.33 MW
934065 AD1-033 E Adder 2.59 MW 2.2 MW
937226 AE2-253 E Adder 2.99 MW 2.54 MW
918512 AA1-065 E OP Adder 2.14 MW 1.82 MW
919153 AA1-139 E2 Adder 2.08 MW 1.77 MW
919152 AA1-139 E1 Adder 2.08 MW 1.77 MW
920692 AA2-178 E Adder 1.81 MW 1.54 MW
925122 AB2-169 E Adder 2.21 MW 1.88 MW
932046 AC2-012 E Adder 6.72 MW 5.72 MW
316311 AC2-079 C Adder 2.3 MW 1.96 MW
932596 AC2-079 E Adder 3.76 MW 3.2 MW
316349 AD2-085 C Adder 1.35 MW 1.15 MW
936666 AD2-085 E Adder 2.2 MW 1.87 MW
961611 AG1-000B C Adder 6.39 MW 5.43 MW
941591 AE2-156 C Adder 9.2 MW 7.82 MW
944581 AF1-123 C Adder 23.79 MW 20.22 MW
944582 AF1-123 E Adder 54.48 MW 46.3 MW
944591 AF1-124 C Adder 23.87 MW 20.29 MW
944592 AF1-124 E Adder 54.67 MW 46.47 MW
944601 AF1-125 C Adder 23.42 MW 19.91 MW
944602 AF1-125 E Adder 53.62 MW 45.58 MW
965691 AG1-437 C Adder 4.11 MW 3.49 MW
965692 AG1-437 E Adder 2.74 MW 2.33 MW
965701 AG1-438 C Adder 4.11 MW 3.49 MW
965702 AG1-438 E Adder 2.74 MW 2.33 MW
965711 AG1-439 C Adder 7.5 MW 6.38 MW
965712 AG1-439 E Adder 5.0 MW 4.25 MW
965741 AG1-442 C Adder 2.4 MW 2.04 MW
965751 AG1-443 C Adder 2.4 MW 2.04 MW
965761 AG1-444 C Adder 4.0 MW 3.4 MW
965811 AG1-449 C Adder 6.52 MW 5.54 MW
932631 AC2-084 C Adder 2.11 MW 1.79 MW
932632 AC2-084 E Adder 1.04 MW 0.88 MW
934501 AD1-074 C Adder 14.2 MW 12.07 MW
934502 AD1-074 E Adder 7.23 MW 6.15 MW
934511 AD1-075 C Adder 3.55 MW 3.02 MW
934512 AD1-075 E Adder 1.81 MW 1.54 MW
938531 AE1-072 C Adder 8.92 MW 7.58 MW
938532 AE1-072 E Adder 4.65 MW 3.95 MW
940641 AE2-051 C Adder 5.83 MW 4.96 MW
940642 AE2-051 E Adder 3.89 MW 3.31 MW
941101 AE2-104 C Adder 1.58 MW 1.34 MW
941102 AE2-104 E Adder 2.52 MW 2.14 MW
941281 AE2-122 C Adder 14.64 MW 12.45 MW
941282 AE2-122 E Adder 59.09 MW 50.22 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 7.35 MW 7.35 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 5.41 MW 5.41 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 24.2 MW 24.2 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.85 MW 0.85 MW
NY PJM->LTFIMP_NY CLTF 0.4 MW 0.4 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.29 MW 0.29 MW
WEC LTFEXP_WEC->PJM CLTF 0.15 MW 0.15 MW
CPLE LTFEXP_CPLE->PJM CLTF 2.98 MW 2.98 MW
TVA LTFEXP_TVA->PJM CLTF 1.47 MW 1.47 MW
MEC LTFEXP_MEC->PJM CLTF 0.94 MW 0.94 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.87 MW 1.87 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 5.39 MW 5.39 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.42 MW 1.42 MW

Details for 6NRTHEST-6ELMONT 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6NRTHEST-6ELMONT 230.0 kV Ckt 1 line
314236 to 314218 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 130.36 678.68 B 884.72 61.91
Elimination
Base Case Details for Eliminated Flowgate 6NRTHEST-6ELMONT 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
965291 AG1-394 C Adder 0.32 MW 0.27 MW
965292 AG1-394 E Adder 0.59 MW 0.5 MW
314541 3WATKINS Adder 0.27 MW 0.23 MW
920042 AA2-088 E OP Adder 3.99 MW 3.39 MW
934521 AD1-076 C Adder 4.65 MW 3.95 MW
934522 AD1-076 E Adder 2.37 MW 2.01 MW
940492 AE2-034 E Adder 1.19 MW 1.01 MW
314539 3UNCAMP Adder 2.41 MW 2.04 MW
916042 Z1-036 E Adder 11.46 MW 9.74 MW
938771 AE1-103 C Adder 1.17 MW 0.99 MW
938772 AE1-103 E Adder 1.62 MW 1.37 MW
314236 6NRTHEST 50/50 0.38 MW 0.38 MW
314331 6POE Adder 0.65 MW 0.56 MW
314507 3THOMPSN Adder 0.85 MW 0.72 MW
314525 6KINGFORK Adder 0.43 MW 0.37 MW
314550 6HICKORY Adder 0.9 MW 0.77 MW
315060 1CHESTF5 Adder 30.83 MW 26.21 MW
315065 1CHESTF6 Adder 11.33 MW 9.63 MW
315067 1DARBY 1 50/50 4.64 MW 4.64 MW
315068 1DARBY 2 50/50 4.65 MW 4.65 MW
315069 1DARBY 3 50/50 4.67 MW 4.67 MW
315070 1DARBY 4 50/50 4.67 MW 4.67 MW
315073 1STONECA Adder 3.57 MW 3.04 MW
315083 1SPRUNCA 50/50 10.34 MW 10.34 MW
315084 1SPRUNCB 50/50 10.34 MW 10.34 MW
315092 1YORKTN3 Adder 66.83 MW 56.81 MW
925865 AC1-065 E Adder 8.77 MW 7.46 MW
926662 AC1-147 E Adder 0.56 MW 0.47 MW
926755 AC1-161 E Adder 5.34 MW 4.54 MW
927226 AC1-216 E Adder 3.77 MW 3.21 MW
934392 AD1-063 E Adder 0.56 MW 0.48 MW
935112 AD1-144 E Adder 0.4 MW 0.34 MW
936582 AD2-073 E Adder 0.46 MW 0.39 MW
936591 AD2-074 C Adder 2.72 MW 2.31 MW
936592 AD2-074 E Adder 4.43 MW 3.77 MW
942162 AE2-228 E Adder 0.81 MW 0.69 MW
942341 AE2-247 C Adder 0.65 MW 0.56 MW
942342 AE2-247 E Adder 0.9 MW 0.77 MW
943461 AF1-017 C Adder 0.59 MW 0.5 MW
943462 AF1-017 E Adder 0.96 MW 0.82 MW
943612 AF1-032 E Adder 0.38 MW 0.33 MW
943741 AF1-042 C Adder 1.42 MW 1.21 MW
943742 AF1-042 E Adder 2.32 MW 1.97 MW
944871 AF1-152 C Adder 2.15 MW 1.82 MW
944872 AF1-152 E Adder 1.43 MW 1.22 MW
961951 AG1-038 C Adder 1.57 MW 1.33 MW
961952 AG1-038 E Adder 2.17 MW 1.84 MW
966661 AG1-536 C Adder 2.59 MW 2.2 MW
966662 AG1-536 E Adder 3.47 MW 2.95 MW
315260 1GOSPORTA Adder 0.89 MW 0.76 MW
315261 1GOSPORTB Adder 1.14 MW 0.97 MW
315262 1GOSPORTC Adder 0.97 MW 0.82 MW
316075 AC2-137 C 50/50 0.39 MW 0.39 MW
316076 AC2-137 E 50/50 1.48 MW 1.48 MW
316078 AC2-138 E Adder 0.43 MW 0.37 MW
316157 AD2-030 E Adder 0.61 MW 0.52 MW
913392 Y1-086 E Adder 0.9 MW 0.76 MW
916192 Z1-068 E Adder 0.78 MW 0.67 MW
923832 AB2-022 E Adder 0.51 MW 0.43 MW
923842 AB2-024 E Adder 0.95 MW 0.81 MW
923852 AB2-025 E Adder 0.45 MW 0.38 MW
939312 AE1-162 E Adder 0.64 MW 0.54 MW
946262 AF1-291 E Adder 0.82 MW 0.69 MW
957492 AF2-043 E Adder 0.59 MW 0.5 MW
957601 AF2-054 C Adder 1.08 MW 0.92 MW
957602 AF2-054 E Adder 0.72 MW 0.61 MW
962861 AG1-135 C Adder 2.93 MW 2.49 MW
962862 AG1-135 E Adder 1.95 MW 1.66 MW
962962 AG1-145 E Adder 0.74 MW 0.63 MW
962971 AG1-146 C Adder 1.52 MW 1.29 MW
962972 AG1-146 E Adder 1.01 MW 0.86 MW
962981 AG1-147 C Adder 3.55 MW 3.01 MW
962982 AG1-147 E Adder 2.36 MW 2.01 MW
963611 AG1-210 C Adder 0.31 MW 0.26 MW
963612 AG1-210 E Adder 0.46 MW 0.39 MW
964211 AG1-282 C Adder 0.96 MW 0.81 MW
964212 AG1-282 E Adder 0.64 MW 0.54 MW
901082 W1-029 E Adder 12.94 MW 11.0 MW
917122 Z2-027 E Adder 0.55 MW 0.47 MW
925332 AB2-190 E Adder 4.04 MW 3.43 MW
925522 AC1-027 E Adder 0.51 MW 0.43 MW
941501 AE2-147 C Adder 6.44 MW 5.47 MW
941502 AE2-147 E Adder 4.29 MW 3.65 MW
942001 AE2-212 C Adder 1.16 MW 0.98 MW
942002 AE2-212 E Adder 0.77 MW 0.66 MW
957832 AF2-077 E Adder 0.7 MW 0.6 MW
957871 AF2-081 C Adder 4.12 MW 3.5 MW
957872 AF2-081 E Adder 1.76 MW 1.5 MW
958161 AF2-110 C Adder 0.57 MW 0.49 MW
958162 AF2-110 E Adder 0.91 MW 0.77 MW
313811 6ELKO L286 50/50 1.54 MW 1.54 MW
314181 3NORNECK Adder 0.41 MW 0.35 MW
933291 AC2-141 C Adder 12.52 MW 10.64 MW
933292 AC2-141 E Adder 5.34 MW 4.54 MW
939411 AE1-173 C Adder 31.49 MW 26.77 MW
939412 AE1-173 E Adder 20.99 MW 17.84 MW
934011 AD1-025 C Adder 8.25 MW 7.01 MW
934012 AD1-025 E Adder 4.88 MW 4.15 MW
315085 1SPRUNCC 50/50 0.17 MW 0.17 MW
315086 1SPRUNCD 50/50 0.17 MW 0.17 MW
933981 AD1-022 C Adder 3.3 MW 2.81 MW
933982 AD1-022 E Adder 0.59 MW 0.5 MW
313053 6PAPERMILL Adder 3.51 MW 2.98 MW
314594 6PLYMOUTH TP Adder 0.12 MW 0.1 MW
314632 6AYDLETT TAP Adder 0.56 MW 0.47 MW
316160 AE1-175 E Adder 0.61 MW 0.52 MW
316169 AC1-164 GEN 50/50 3.56 MW 3.56 MW
316240 AF1-291 C Adder 1.22 MW 1.04 MW
316301 AE2-228 C Adder 1.22 MW 1.04 MW
924516 AB2-100 E1 Adder 1.06 MW 0.9 MW
924517 AB2-100 E2 Adder 1.06 MW 0.9 MW
926785 AC1-164_E 50/50 10.57 MW 10.57 MW
934065 AD1-033 E Adder 2.08 MW 1.77 MW
937226 AE2-253 E Adder 2.41 MW 2.05 MW
939612 AE1-191 E Adder 2.96 MW 2.52 MW
963221 AG1-171 C Adder 1.05 MW 0.89 MW
963222 AG1-171 E Adder 0.7 MW 0.59 MW
963231 AG1-172 C Adder 1.05 MW 0.89 MW
963232 AG1-172 E Adder 0.7 MW 0.59 MW
963241 AG1-173 C Adder 1.05 MW 0.89 MW
963242 AG1-173 E Adder 0.7 MW 0.59 MW
939246 AE1-155 E Adder 4.19 MW 3.56 MW
919153 AA1-139 E2 Adder 1.68 MW 1.43 MW
919152 AA1-139 E1 Adder 1.68 MW 1.43 MW
920692 AA2-178 E Adder 1.59 MW 1.35 MW
924814 AB2-134 E Adder 6.18 MW 5.25 MW
316084 AB2-161 E Adder 2.58 MW 2.19 MW
932046 AC2-012 E Adder 5.5 MW 4.67 MW
316311 AC2-079 C Adder 2.49 MW 2.12 MW
932596 AC2-079 E Adder 4.07 MW 3.46 MW
934146 AD1-041 E Adder 1.85 MW 1.57 MW
934576 AD1-082 E Adder 2.05 MW 1.75 MW
316349 AD2-085 C Adder 1.5 MW 1.28 MW
936666 AD2-085 E Adder 2.46 MW 2.09 MW
961611 AG1-000B C Adder 7.5 MW 6.37 MW
941591 AE2-156 C Adder 7.51 MW 6.38 MW
942371 AE2-250 C Adder 5.56 MW 4.72 MW
942372 AE2-250 E Adder 2.93 MW 2.49 MW
944581 AF1-123 C Adder 18.75 MW 15.94 MW
944582 AF1-123 E Adder 42.94 MW 36.5 MW
944591 AF1-124 C Adder 18.82 MW 15.99 MW
944592 AF1-124 E Adder 43.09 MW 36.63 MW
944601 AF1-125 C Adder 18.46 MW 15.69 MW
944602 AF1-125 E Adder 42.26 MW 35.92 MW
944631 AF1-128 C Adder 19.29 MW 16.4 MW
958261 AF2-120 C Adder 3.01 MW 2.56 MW
958262 AF2-120 E Adder 2.0 MW 1.7 MW
962271 AG1-075 C Adder 9.59 MW 8.15 MW
962272 AG1-075 E Adder 5.84 MW 4.97 MW
965281 AG1-393 C Adder 1.23 MW 1.05 MW
965282 AG1-393 E Adder 0.82 MW 0.7 MW
934501 AD1-074 C Adder 12.79 MW 10.87 MW
934502 AD1-074 E Adder 6.51 MW 5.54 MW
934511 AD1-075 C Adder 3.2 MW 2.72 MW
934512 AD1-075 E Adder 1.63 MW 1.38 MW
935161 AD1-151 C Adder 7.98 MW 6.79 MW
935162 AD1-151 E Adder 5.32 MW 4.52 MW
938531 AE1-072 C Adder 7.22 MW 6.14 MW
938532 AE1-072 E Adder 3.77 MW 3.2 MW
939191 AE1-149 C Adder 5.21 MW 4.43 MW
939192 AE1-149 E Adder 3.48 MW 2.95 MW
939602 AE1-190 E Adder 0.74 MW 0.63 MW
940431 AE2-027 C Adder 7.6 MW 6.46 MW
940432 AE2-027 E Adder 5.06 MW 4.3 MW
940481 AE2-033 C Adder 6.22 MW 5.29 MW
940482 AE2-033 E Adder 4.19 MW 3.56 MW
940541 AE2-040 C Adder 1.11 MW 0.94 MW
940551 AE2-041 C Adder 3.74 MW 3.18 MW
941101 AE2-104 C Adder 1.4 MW 1.19 MW
941102 AE2-104 E Adder 2.23 MW 1.9 MW
941281 AE2-122 C Adder 11.85 MW 10.07 MW
941282 AE2-122 E Adder 47.81 MW 40.64 MW
943471 AF1-018 C Adder 3.74 MW 3.18 MW
944641 AF1-129 C Adder 59.09 MW 50.23 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 5.15 MW 5.15 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 4.8 MW 4.8 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 24.88 MW 24.88 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.03 MW 1.03 MW
NY PJM->LTFIMP_NY CLTF 0.49 MW 0.49 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.22 MW 0.22 MW
WEC LTFEXP_WEC->PJM CLTF 0.11 MW 0.11 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.12 MW 3.12 MW
TVA LTFEXP_TVA->PJM CLTF 1.37 MW 1.37 MW
MEC LTFEXP_MEC->PJM CLTF 0.75 MW 0.75 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.75 MW 1.75 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.04 MW 0.04 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.55 MW 6.55 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.49 MW 1.49 MW

Details for 8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 573_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line
314911 to 314905 ckt 1
DVP_P1-2: LN 573_SRT-A
CONTINGENCY 'DVP_P1-2: LN 573_SRT-A'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
OP AC 104.67 4070.2 B 4260.16 164.99
Elimination
Base Case Details for Eliminated Flowgate 8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 573_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
941031 AE2-094 C Adder 39.05 MW 33.19 MW
941032 AE2-094 E Adder 13.03 MW 11.08 MW
314229 6MT RD221 50/50 0.13 MW 0.13 MW
314236 6NRTHEST 50/50 0.2 MW 0.2 MW
314331 6POE Adder 1.5 MW 1.27 MW
314507 3THOMPSN Adder 2.22 MW 1.89 MW
314525 6KINGFORK Adder 1.12 MW 0.95 MW
314550 6HICKORY Adder 2.39 MW 2.03 MW
315039 1LDYSMT3 50/50 5.16 MW 5.16 MW
315040 1LDYSMT4 50/50 5.17 MW 5.17 MW
315041 1LDYSMT5 50/50 5.18 MW 5.18 MW
315060 1CHESTF5 Adder 72.13 MW 61.31 MW
315065 1CHESTF6 Adder 22.19 MW 18.86 MW
315073 1STONECA Adder 7.81 MW 6.64 MW
315083 1SPRUNCA Adder 10.32 MW 8.77 MW
315084 1SPRUNCB Adder 10.32 MW 8.77 MW
315092 1YORKTN3 Adder 157.99 MW 134.29 MW
925865 AC1-065 E Adder 18.41 MW 15.65 MW
926412 AC1-112 E 50/50 1.29 MW 1.29 MW
926662 AC1-147 E Adder 1.46 MW 1.24 MW
926755 AC1-161 E Adder 14.33 MW 12.18 MW
927226 AC1-216 E Adder 8.68 MW 7.38 MW
934392 AD1-063 E Adder 1.19 MW 1.01 MW
935112 AD1-144 E Adder 1.04 MW 0.88 MW
942152 AE2-227 E Adder 1.66 MW 1.41 MW
942162 AE2-228 E Adder 1.62 MW 1.38 MW
942341 AE2-247 C Adder 1.64 MW 1.39 MW
942342 AE2-247 E Adder 2.26 MW 1.92 MW
943461 AF1-017 C Adder 1.48 MW 1.26 MW
943462 AF1-017 E Adder 2.42 MW 2.06 MW
943612 AF1-032 E Adder 1.01 MW 0.86 MW
944871 AF1-152 C Adder 5.72 MW 4.87 MW
944872 AF1-152 E Adder 3.82 MW 3.24 MW
960091 AF2-300 C 50/50 2.56 MW 2.56 MW
960092 AF2-300 E 50/50 1.71 MW 1.71 MW
966871 AG1-558 C Adder 2.72 MW 2.32 MW
966872 AG1-558 E Adder 1.37 MW 1.17 MW
966881 AG1-559 C 50/50 2.84 MW 2.84 MW
966882 AG1-559 E 50/50 1.43 MW 1.43 MW
315225 1N ANNA1 50/50 38.0 MW 38.0 MW
315226 1N ANNA2 50/50 38.02 MW 38.02 MW
315260 1GOSPORTA Adder 2.35 MW 2.0 MW
315261 1GOSPORTB Adder 3.0 MW 2.55 MW
315262 1GOSPORTC Adder 2.54 MW 2.16 MW
316076 AC2-137 E Adder 1.52 MW 1.29 MW
316157 AD2-030 E Adder 1.31 MW 1.11 MW
913392 Y1-086 E Adder 2.39 MW 2.03 MW
916192 Z1-068 E Adder 2.07 MW 1.76 MW
923832 AB2-022 E Adder 1.35 MW 1.15 MW
923842 AB2-024 E Adder 1.99 MW 1.69 MW
930122 AB1-027 E 50/50 1.58 MW 1.58 MW
938552 AE1-074 E Adder 1.38 MW 1.18 MW
939312 AE1-162 E Adder 1.59 MW 1.35 MW
946262 AF1-291 E Adder 1.62 MW 1.38 MW
957411 AF2-035 C 50/50 10.25 MW 10.25 MW
957412 AF2-035 E 50/50 5.12 MW 5.12 MW
957492 AF2-043 E Adder 1.56 MW 1.32 MW
957601 AF2-054 C Adder 2.34 MW 1.99 MW
957602 AF2-054 E Adder 1.56 MW 1.32 MW
962962 AG1-145 E Adder 1.63 MW 1.38 MW
963051 AG1-154 C 50/50 4.26 MW 4.26 MW
963052 AG1-154 E 50/50 6.39 MW 6.39 MW
901082 W1-029 E Adder 34.54 MW 29.36 MW
917122 Z2-027 E Adder 1.46 MW 1.24 MW
925332 AB2-190 E Adder 9.1 MW 7.73 MW
925522 AC1-027 E Adder 1.34 MW 1.14 MW
941501 AE2-147 C Adder 17.17 MW 14.6 MW
941502 AE2-147 E Adder 11.45 MW 9.73 MW
942001 AE2-212 C Adder 2.41 MW 2.05 MW
942002 AE2-212 E Adder 1.61 MW 1.37 MW
957832 AF2-077 E Adder 1.59 MW 1.35 MW
957871 AF2-081 C Adder 10.93 MW 9.29 MW
957872 AF2-081 E Adder 4.68 MW 3.98 MW
958161 AF2-110 C Adder 1.49 MW 1.27 MW
958162 AF2-110 E Adder 2.38 MW 2.02 MW
313811 6ELKO L286 Adder 1.58 MW 1.35 MW
933291 AC2-141 C Adder 33.57 MW 28.53 MW
933292 AC2-141 E Adder 14.33 MW 12.18 MW
939411 AE1-173 C Adder 93.99 MW 79.89 MW
939412 AE1-173 E Adder 62.66 MW 53.26 MW
934011 AD1-025 C Adder 18.97 MW 16.12 MW
934012 AD1-025 E Adder 11.24 MW 9.55 MW
927041 AC1-191 C Adder 10.94 MW 9.3 MW
927042 AC1-191 E Adder 5.45 MW 4.63 MW
313053 6PAPERMILL Adder 7.35 MW 6.25 MW
314632 6AYDLETT TAP Adder 1.48 MW 1.26 MW
316004 AC1-112 C 50/50 0.35 MW 0.35 MW
316160 AE1-175 E Adder 1.34 MW 1.14 MW
316233 AE1-074 C Adder 2.74 MW 2.33 MW
316240 AF1-291 C Adder 2.43 MW 2.07 MW
316301 AE2-228 C Adder 2.43 MW 2.07 MW
316304 AE2-227 C Adder 2.49 MW 2.11 MW
316312 AB1-027 C 50/50 0.56 MW 0.56 MW
926785 AC1-164_E Adder 20.59 MW 17.5 MW
934065 AD1-033 E Adder 5.51 MW 4.68 MW
937226 AE2-253 E Adder 6.39 MW 5.43 MW
939612 AE1-191 E Adder 6.29 MW 5.35 MW
963221 AG1-171 C Adder 2.42 MW 2.05 MW
963222 AG1-171 E Adder 1.61 MW 1.37 MW
963231 AG1-172 C Adder 2.42 MW 2.05 MW
963232 AG1-172 E Adder 1.61 MW 1.37 MW
963241 AG1-173 C Adder 2.42 MW 2.05 MW
963242 AG1-173 E Adder 1.61 MW 1.37 MW
315037 1LDYSMT1 50/50 4.96 MW 4.96 MW
315038 1LDYSMT2 50/50 5.02 MW 5.02 MW
315051 AA1-145 CT1 50/50 5.36 MW 5.36 MW
315052 AA1-145 CT2 50/50 5.35 MW 5.35 MW
316427 AG1-213 C 50/50 0.85 MW 0.85 MW
315043 1FOUR RIVERA 50/50 3.36 MW 3.36 MW
315044 1FOUR RIVERB 50/50 3.36 MW 3.36 MW
315045 1FOUR RIVERC 50/50 4.11 MW 4.11 MW
315046 1FOUR RIVERD 50/50 3.31 MW 3.31 MW
315047 1FOUR RIVERE 50/50 3.31 MW 3.31 MW
315048 1FOUR RIVERF 50/50 4.05 MW 4.05 MW
919153 AA1-139 E2 Adder 4.47 MW 3.8 MW
919152 AA1-139 E1 Adder 4.47 MW 3.8 MW
924814 AB2-134 E Adder 14.22 MW 12.08 MW
316084 AB2-161 E Adder 6.11 MW 5.2 MW
932046 AC2-012 E Adder 14.44 MW 12.28 MW
316311 AC2-079 C Adder 6.29 MW 5.35 MW
932596 AC2-079 E Adder 10.26 MW 8.72 MW
934146 AD1-041 E Adder 3.93 MW 3.34 MW
934576 AD1-082 E Adder 4.87 MW 4.14 MW
316349 AD2-085 C Adder 3.78 MW 3.21 MW
936666 AD2-085 E Adder 6.16 MW 5.24 MW
961611 AG1-000B C Adder 17.82 MW 15.14 MW
941591 AE2-156 C Adder 19.74 MW 16.78 MW
942371 AE2-250 C Adder 10.89 MW 9.26 MW
942372 AE2-250 E Adder 5.75 MW 4.89 MW
944581 AF1-123 C Adder 49.97 MW 42.48 MW
944582 AF1-123 E Adder 114.43 MW 97.26 MW
944591 AF1-124 C Adder 50.15 MW 42.63 MW
944592 AF1-124 E Adder 114.84 MW 97.61 MW
944601 AF1-125 C Adder 49.2 MW 41.82 MW
944602 AF1-125 E Adder 112.63 MW 95.74 MW
944631 AF1-128 C Adder 45.13 MW 38.36 MW
962271 AG1-075 C Adder 18.8 MW 15.98 MW
962272 AG1-075 E Adder 11.46 MW 9.74 MW
965281 AG1-393 C Adder 2.42 MW 2.06 MW
965282 AG1-393 E Adder 1.61 MW 1.37 MW
935161 AD1-151 C Adder 18.16 MW 15.44 MW
935162 AD1-151 E Adder 12.11 MW 10.29 MW
938531 AE1-072 C Adder 19.2 MW 16.32 MW
938532 AE1-072 E Adder 10.01 MW 8.51 MW
939191 AE1-149 C Adder 11.92 MW 10.13 MW
939192 AE1-149 E Adder 7.95 MW 6.75 MW
939261 AE1-157 C 50/50 16.59 MW 16.59 MW
939262 AE1-157 E 50/50 9.0 MW 9.0 MW
939602 AE1-190 E Adder 1.57 MW 1.34 MW
940431 AE2-027 C Adder 14.55 MW 12.37 MW
940432 AE2-027 E Adder 9.7 MW 8.25 MW
940551 AE2-041 C Adder 7.91 MW 6.72 MW
940641 AE2-051 C Adder 17.6 MW 14.96 MW
940642 AE2-051 E Adder 11.73 MW 9.97 MW
941101 AE2-104 C Adder 3.66 MW 3.11 MW
941102 AE2-104 E Adder 5.82 MW 4.95 MW
941281 AE2-122 C Adder 31.28 MW 26.59 MW
941282 AE2-122 E Adder 126.23 MW 107.3 MW
942191 AE2-231 C 50/50 5.63 MW 5.63 MW
942192 AE2-231 E 50/50 3.76 MW 3.76 MW
943471 AF1-018 C Adder 7.91 MW 6.72 MW
944641 AF1-129 C Adder 115.74 MW 98.38 MW
963622 AG1-213 E 50/50 0.85 MW 0.85 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 31.09 MW 31.09 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 22.9 MW 22.9 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 92.21 MW 92.21 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.68 MW 5.68 MW
NY PJM->LTFIMP_NY CLTF 2.69 MW 2.69 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.34 MW 1.34 MW
WEC LTFEXP_WEC->PJM CLTF 0.66 MW 0.66 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.76 MW 10.76 MW
TVA LTFEXP_TVA->PJM CLTF 6.25 MW 6.25 MW
MEC LTFEXP_MEC->PJM CLTF 4.02 MW 4.02 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.81 MW 7.81 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.26 MW 0.26 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.18 MW 36.18 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.13 MW 5.13 MW

Details for 6GARYSVILLE-6HOPEWLL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2197_SRT-A-2


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6GARYSVILLE-6HOPEWLL 230.0 kV Ckt 1 line
313902 to 314303 ckt 1
DVP_P1-2: LN 2197_SRT-A-2
CONTINGENCY 'DVP_P1-2: LN 2197_SRT-A-2'
 OPEN BRANCH FROM BUS 935160 TO BUS 314303 CKT 1   /*AD1-151 TP   230.0 - 6HOPEWLL     230.0
END
OP AC 102.27 678.68 B 694.09 56.51
Elimination
Base Case Details for Eliminated Flowgate 6GARYSVILLE-6HOPEWLL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2197_SRT-A-2
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
940492 AE2-034 E Adder 0.97 MW 0.82 MW
916042 Z1-036 E Adder 10.33 MW 8.78 MW
314507 3THOMPSN Adder 1.03 MW 0.87 MW
314525 6KINGFORK Adder 0.56 MW 0.48 MW
314550 6HICKORY Adder 0.92 MW 0.78 MW
315092 1YORKTN3 Adder 50.88 MW 43.25 MW
926662 AC1-147 E Adder 0.67 MW 0.57 MW
927226 AC1-216 E 50/50 10.84 MW 10.84 MW
935112 AD1-144 E Adder 0.52 MW 0.44 MW
943612 AF1-032 E Adder 0.38 MW 0.32 MW
944871 AF1-152 C Adder 2.03 MW 1.72 MW
944872 AF1-152 E Adder 1.35 MW 1.15 MW
315116 1SURRY 1 50/50 32.17 MW 32.17 MW
315117 1GRAVELC 50/50 1.12 MW 1.12 MW
315119 1GRAVEL3 50/50 3.27 MW 3.27 MW
315120 1GRAVEL4 50/50 3.31 MW 3.31 MW
315121 1GRAVEL5 50/50 3.27 MW 3.27 MW
315122 1GRAVEL6 50/50 3.31 MW 3.31 MW
315260 1GOSPORTA Adder 1.08 MW 0.92 MW
315261 1GOSPORTB Adder 1.38 MW 1.17 MW
315262 1GOSPORTC Adder 1.17 MW 1.0 MW
316132 AB2-190 C 50/50 14.21 MW 14.21 MW
913392 Y1-086 E Adder 0.88 MW 0.74 MW
916192 Z1-068 E Adder 0.87 MW 0.74 MW
923832 AB2-022 E Adder 0.49 MW 0.42 MW
939312 AE1-162 E 50/50 1.52 MW 1.52 MW
957492 AF2-043 E Adder 0.58 MW 0.49 MW
901082 W1-029 E Adder 12.24 MW 10.4 MW
917122 Z2-027 E Adder 0.53 MW 0.45 MW
925332 AB2-190 E 50/50 29.1 MW 29.1 MW
925522 AC1-027 E Adder 0.57 MW 0.48 MW
941501 AE2-147 C Adder 6.08 MW 5.17 MW
941502 AE2-147 E Adder 4.06 MW 3.45 MW
942001 AE2-212 C Adder -0.66 MW -0.56 MW
957871 AF2-081 C Adder 4.14 MW 3.52 MW
957872 AF2-081 E Adder 1.78 MW 1.51 MW
958161 AF2-110 C Adder 0.46 MW 0.39 MW
958162 AF2-110 E Adder 0.73 MW 0.62 MW
934011 AD1-025 C 50/50 23.68 MW 23.68 MW
934012 AD1-025 E 50/50 14.03 MW 14.03 MW
314632 6AYDLETT TAP Adder 0.56 MW 0.47 MW
316236 AE1-162 C 50/50 0.34 MW 0.34 MW
316240 AF1-291 C Adder -0.82 MW -0.69 MW
316301 AE2-228 C Adder -0.79 MW -0.68 MW
316304 AE2-227 C Adder -0.7 MW -0.59 MW
316369 AC1-216 C 50/50 2.09 MW 2.09 MW
934065 AD1-033 E Adder 2.16 MW 1.83 MW
937226 AE2-253 E Adder 2.44 MW 2.07 MW
963221 AG1-171 C 50/50 3.02 MW 3.02 MW
963222 AG1-171 E 50/50 2.01 MW 2.01 MW
963231 AG1-172 C 50/50 3.02 MW 3.02 MW
963232 AG1-172 E 50/50 2.01 MW 2.01 MW
963241 AG1-173 C 50/50 3.02 MW 3.02 MW
963242 AG1-173 E 50/50 2.01 MW 2.01 MW
919153 AA1-139 E2 Adder 1.69 MW 1.44 MW
919152 AA1-139 E1 Adder 1.69 MW 1.44 MW
920692 AA2-178 E Adder 1.29 MW 1.1 MW
316033 AB2-134 GEN 50/50 2.73 MW 2.73 MW
924814 AB2-134 E 50/50 17.75 MW 17.75 MW
932046 AC2-012 E Adder 6.66 MW 5.66 MW
961611 AG1-000B C 50/50 28.59 MW 28.59 MW
941591 AE2-156 C Adder 9.02 MW 7.66 MW
944581 AF1-123 C Adder 17.11 MW 14.55 MW
944582 AF1-123 E Adder 39.19 MW 33.31 MW
944591 AF1-124 C Adder 17.18 MW 14.6 MW
944592 AF1-124 E Adder 39.33 MW 33.43 MW
944601 AF1-125 C Adder 16.85 MW 14.32 MW
944602 AF1-125 E Adder 38.58 MW 32.79 MW
935161 AD1-151 C 50/50 22.63 MW 22.63 MW
935162 AD1-151 E 50/50 15.09 MW 15.09 MW
938531 AE1-072 C Adder 7.23 MW 6.14 MW
938532 AE1-072 E Adder 3.77 MW 3.2 MW
941101 AE2-104 C Adder 1.12 MW 0.96 MW
941102 AE2-104 E Adder 1.79 MW 1.52 MW
941281 AE2-122 C Adder 13.07 MW 11.11 MW
941282 AE2-122 E Adder 52.73 MW 44.82 MW
944641 AF1-129 C Adder -40.56 MW -34.48 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.87 MW 0.87 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 7.27 MW 7.27 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.46 MW 0.46 MW
NY PJM->LTFIMP_NY CLTF 0.22 MW 0.22 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.01 MW 0.01 MW
WEC LTFEXP_WEC->PJM CLTF 0.0 MW 0.0 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.98 MW 0.98 MW
TVA LTFEXP_TVA->PJM CLTF 0.3 MW 0.3 MW
MEC LTFEXP_MEC->PJM CLTF 0.07 MW 0.07 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.39 MW 0.39 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.92 MW 2.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.47 MW 0.47 MW

Details for 6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer
314322 to 314914 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 112.54 1058.16 B 1190.85 63.54
Elimination
Base Case Details for Eliminated Flowgate 6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C Adder 1.12 MW 0.95 MW
961792 AG1-021 E Adder 0.74 MW 0.63 MW
961801 AG1-022 C Adder 1.0 MW 0.85 MW
961802 AG1-022 E Adder 0.67 MW 0.57 MW
963171 AG1-166 C Adder 0.56 MW 0.47 MW
963172 AG1-166 E Adder 1.3 MW 1.11 MW
963181 AG1-167 C Adder 0.42 MW 0.35 MW
963182 AG1-167 E Adder 0.98 MW 0.83 MW
963191 AG1-168 C Adder 0.42 MW 0.35 MW
963192 AG1-168 E Adder 0.98 MW 0.83 MW
963201 AG1-169 C Adder 0.42 MW 0.35 MW
963202 AG1-169 E Adder 0.98 MW 0.83 MW
963211 AG1-170 C Adder 0.28 MW 0.24 MW
963212 AG1-170 E Adder 0.65 MW 0.55 MW
964111 AG1-272 C Adder 0.52 MW 0.44 MW
964112 AG1-272 E Adder 1.21 MW 1.03 MW
964121 AG1-273 C Adder 0.52 MW 0.44 MW
964122 AG1-273 E Adder 1.21 MW 1.03 MW
964131 AG1-274 C Adder 0.52 MW 0.44 MW
964132 AG1-274 E Adder 1.21 MW 1.03 MW
965191 AG1-384 C Adder 0.52 MW 0.44 MW
965192 AG1-384 E Adder 1.21 MW 1.03 MW
965591 AG1-427 C Adder 5.8 MW 4.93 MW
965592 AG1-427 E Adder 3.86 MW 3.28 MW
966621 AG1-532 C Adder 0.63 MW 0.54 MW
966622 AG1-532 E Adder 0.42 MW 0.36 MW
313853 3PONTONDP Adder 0.37 MW 0.32 MW
314541 3WATKINS Adder 0.3 MW 0.26 MW
314572 3EMPORIA Adder 0.19 MW 0.17 MW
314713 3PAMPLIN Adder 0.57 MW 0.48 MW
946592 AF1-323 E Adder 1.83 MW 1.56 MW
958801 AF2-171 C Adder 8.35 MW 7.1 MW
958802 AF2-171 E Adder 5.57 MW 4.73 MW
959311 AF2-222 C Adder 8.75 MW 7.44 MW
959312 AF2-222 E Adder 5.86 MW 4.99 MW
960081 AF2-299 C Adder 0.91 MW 0.78 MW
960082 AF2-299 E Adder 0.61 MW 0.52 MW
960111 AF2-302 C Adder 1.0 MW 0.85 MW
960112 AF2-302 E Adder 0.67 MW 0.57 MW
923573 AB1-173 E OP Adder 1.46 MW 1.24 MW
924162 AB2-060 E OP Adder 2.04 MW 1.74 MW
924302 AB2-077 E O1 Adder 0.63 MW 0.54 MW
924312 AB2-078 E O1 Adder 0.63 MW 0.54 MW
924322 AB2-079 E O1 Adder 0.63 MW 0.54 MW
925612 AC1-036 E Adder 0.45 MW 0.38 MW
938371 AE1-056 C Adder 3.69 MW 3.14 MW
938372 AE1-056 E Adder 2.02 MW 1.71 MW
941011 AE2-092 C Adder 6.78 MW 5.77 MW
941012 AE2-092 E Adder 4.52 MW 3.84 MW
946281 AF1-292 C Adder 0.7 MW 0.59 MW
946282 AF1-292 E Adder 0.47 MW 0.4 MW
946301 AF1-294 C Adder 2.29 MW 1.94 MW
946302 AF1-294 E Adder 1.52 MW 1.29 MW
946591 AF1-323 C Adder 2.75 MW 2.33 MW
958211 AF2-115 C Adder 1.39 MW 1.19 MW
958212 AF2-115 E Adder 0.93 MW 0.79 MW
314539 3UNCAMP Adder 2.68 MW 2.28 MW
938771 AE1-103 C Adder 1.29 MW 1.1 MW
938772 AE1-103 E Adder 1.79 MW 1.52 MW
924032 AB2-045 E Adder 0.98 MW 0.83 MW
933502 AC2-165 E 50/50 10.23 MW 10.23 MW
314309 6IRON208 50/50 0.3 MW 0.3 MW
314331 6POE Adder 0.74 MW 0.63 MW
314507 3THOMPSN Adder 0.87 MW 0.74 MW
314525 6KINGFORK Adder 0.45 MW 0.38 MW
314550 6HICKORY Adder 0.93 MW 0.79 MW
315060 1CHESTF5 Adder 37.8 MW 32.13 MW
315065 1CHESTF6 Adder 12.33 MW 10.48 MW
315073 1STONECA Adder 4.03 MW 3.42 MW
315083 1SPRUNCA 50/50 9.33 MW 9.33 MW
315084 1SPRUNCB 50/50 9.33 MW 9.33 MW
315092 1YORKTN3 Adder 60.4 MW 51.34 MW
925865 AC1-065 E Adder 7.26 MW 6.17 MW
926412 AC1-112 E Adder 0.54 MW 0.46 MW
926662 AC1-147 E Adder 0.57 MW 0.49 MW
927226 AC1-216 E Adder 4.09 MW 3.48 MW
935112 AD1-144 E Adder 0.42 MW 0.35 MW
942152 AE2-227 E 50/50 1.06 MW 1.06 MW
942162 AE2-228 E Adder 0.89 MW 0.75 MW
942341 AE2-247 C Adder 0.7 MW 0.59 MW
942342 AE2-247 E Adder 0.97 MW 0.82 MW
943461 AF1-017 C Adder 0.63 MW 0.54 MW
943462 AF1-017 E Adder 1.03 MW 0.88 MW
943612 AF1-032 E Adder 0.4 MW 0.34 MW
958502 AF2-144 E 50/50 1.78 MW 1.78 MW
966871 AG1-558 C Adder 1.25 MW 1.06 MW
966872 AG1-558 E Adder 0.63 MW 0.54 MW
315260 1GOSPORTA Adder 0.92 MW 0.78 MW
315261 1GOSPORTB Adder 1.18 MW 1.0 MW
315262 1GOSPORTC Adder 1.0 MW 0.85 MW
316076 AC2-137 E Adder 0.69 MW 0.59 MW
916192 Z1-068 E Adder 0.81 MW 0.69 MW
923842 AB2-024 E Adder 0.76 MW 0.65 MW
923852 AB2-025 E Adder 0.54 MW 0.46 MW
923862 AB2-026 E 50/50 1.81 MW 1.81 MW
930122 AB1-027 E Adder 0.66 MW 0.56 MW
938552 AE1-074 E 50/50 1.87 MW 1.87 MW
938562 AE1-075 E 50/50 1.54 MW 1.54 MW
939312 AE1-162 E Adder 0.67 MW 0.57 MW
946262 AF1-291 E Adder 0.89 MW 0.76 MW
957492 AF2-043 E Adder 0.61 MW 0.52 MW
962962 AG1-145 E Adder 0.62 MW 0.53 MW
925332 AB2-190 E Adder 4.45 MW 3.78 MW
925522 AC1-027 E Adder 0.52 MW 0.45 MW
942001 AE2-212 C Adder 1.28 MW 1.08 MW
942002 AE2-212 E Adder 0.85 MW 0.72 MW
957871 AF2-081 C Adder 4.27 MW 3.63 MW
957872 AF2-081 E Adder 1.83 MW 1.56 MW
958161 AF2-110 C Adder 0.61 MW 0.52 MW
958162 AF2-110 E Adder 0.96 MW 0.82 MW
313811 6ELKO L286 Adder 0.72 MW 0.61 MW
314722 3TWITTYS Adder 0.49 MW 0.42 MW
936261 AD2-033 C Adder 6.65 MW 5.65 MW
936262 AD2-033 E Adder 4.43 MW 3.77 MW
934621 AD1-088 C Adder 6.42 MW 5.45 MW
934622 AD1-088 E Adder 3.02 MW 2.57 MW
939411 AE1-173 C Adder 36.75 MW 31.24 MW
939412 AE1-173 E Adder 24.5 MW 20.83 MW
934011 AD1-025 C Adder 8.94 MW 7.6 MW
934012 AD1-025 E Adder 5.3 MW 4.5 MW
315085 1SPRUNCC 50/50 0.15 MW 0.15 MW
315086 1SPRUNCD 50/50 0.15 MW 0.15 MW
927041 AC1-191 C Adder 5.03 MW 4.28 MW
927042 AC1-191 E Adder 2.51 MW 2.13 MW
313053 6PAPERMILL Adder 2.82 MW 2.4 MW
314632 6AYDLETT TAP Adder 0.58 MW 0.49 MW
316160 AE1-175 E Adder 0.51 MW 0.44 MW
316233 AE1-074 C 50/50 3.71 MW 3.71 MW
316240 AF1-291 C Adder 1.34 MW 1.14 MW
316258 AE1-075 C 50/50 0.48 MW 0.48 MW
316301 AE2-228 C Adder 1.33 MW 1.13 MW
316304 AE2-227 C 50/50 1.59 MW 1.59 MW
316313 AB2-026 C 50/50 0.52 MW 0.52 MW
316336 AC2-165 C 50/50 13.59 MW 13.59 MW
316405 AF2-144 C 50/50 0.4 MW 0.4 MW
924516 AB2-100 E1 Adder 1.3 MW 1.11 MW
924517 AB2-100 E2 Adder 1.3 MW 1.11 MW
926785 AC1-164_E Adder 8.15 MW 6.93 MW
934065 AD1-033 E Adder 2.14 MW 1.82 MW
937226 AE2-253 E Adder 2.5 MW 2.12 MW
939612 AE1-191 E Adder 2.45 MW 2.08 MW
963221 AG1-171 C Adder 1.14 MW 0.97 MW
963222 AG1-171 E Adder 0.76 MW 0.65 MW
963231 AG1-172 C Adder 1.14 MW 0.97 MW
963232 AG1-172 E Adder 0.76 MW 0.65 MW
963241 AG1-173 C Adder 1.14 MW 0.97 MW
963242 AG1-173 E Adder 0.76 MW 0.65 MW
919153 AA1-139 E2 Adder 1.75 MW 1.49 MW
919152 AA1-139 E1 Adder 1.75 MW 1.49 MW
923994 AB2-040_E Adder 2.74 MW 2.33 MW
924022 AB2-043 E O1 Adder 2.46 MW 2.09 MW
924814 AB2-134 E Adder 6.7 MW 5.7 MW
316084 AB2-161 E Adder 2.82 MW 2.4 MW
316088 AB2-174 E Adder 2.92 MW 2.48 MW
932046 AC2-012 E Adder 5.67 MW 4.82 MW
316311 AC2-079 C Adder 2.67 MW 2.27 MW
932596 AC2-079 E Adder 4.36 MW 3.71 MW
934146 AD1-041 E Adder 1.53 MW 1.3 MW
934576 AD1-082 E Adder 2.24 MW 1.91 MW
316349 AD2-085 C Adder 1.62 MW 1.37 MW
936666 AD2-085 E Adder 2.64 MW 2.24 MW
961611 AG1-000B C Adder 7.91 MW 6.73 MW
941591 AE2-156 C Adder 7.74 MW 6.58 MW
942371 AE2-250 C Adder 5.76 MW 4.9 MW
942372 AE2-250 E Adder 3.04 MW 2.59 MW
944581 AF1-123 C Adder 19.24 MW 16.36 MW
944582 AF1-123 E Adder 44.07 MW 37.46 MW
944591 AF1-124 C Adder 19.31 MW 16.42 MW
944592 AF1-124 E Adder 44.23 MW 37.59 MW
944601 AF1-125 C Adder 17.24 MW 14.65 MW
944602 AF1-125 E Adder 39.45 MW 33.54 MW
944631 AF1-128 C Adder 23.65 MW 20.11 MW
962271 AG1-075 C Adder 9.95 MW 8.46 MW
962272 AG1-075 E Adder 6.06 MW 5.15 MW
962491 AG1-098 C Adder 5.75 MW 4.89 MW
962492 AG1-098 E Adder 3.83 MW 3.26 MW
964241 AG1-285 C Adder 6.14 MW 5.22 MW
964242 AG1-285 E Adder 4.1 MW 3.48 MW
965281 AG1-393 C Adder 1.28 MW 1.09 MW
965282 AG1-393 E Adder 0.85 MW 0.73 MW
965601 AG1-428 C Adder 2.21 MW 1.88 MW
965602 AG1-428 E Adder 1.47 MW 1.25 MW
965831 AG1-451 C Adder 2.02 MW 1.72 MW
935161 AD1-151 C Adder 8.73 MW 7.42 MW
935162 AD1-151 E Adder 5.82 MW 4.95 MW
938531 AE1-072 C Adder 7.51 MW 6.39 MW
938532 AE1-072 E Adder 3.92 MW 3.33 MW
938821 AE1-108 C Adder 8.16 MW 6.94 MW
938822 AE1-108 E Adder 3.89 MW 3.31 MW
939191 AE1-149 C Adder 5.77 MW 4.9 MW
939192 AE1-149 E Adder 3.84 MW 3.27 MW
939602 AE1-190 E Adder 0.61 MW 0.52 MW
940431 AE2-027 C Adder 7.77 MW 6.61 MW
940432 AE2-027 E Adder 5.18 MW 4.4 MW
940481 AE2-033 C Adder 7.49 MW 6.37 MW
940482 AE2-033 E Adder 5.05 MW 4.29 MW
940541 AE2-040 C Adder 1.33 MW 1.13 MW
940641 AE2-051 C Adder 6.9 MW 5.87 MW
940642 AE2-051 E Adder 4.6 MW 3.91 MW
941101 AE2-104 C Adder 1.48 MW 1.26 MW
941102 AE2-104 E Adder 2.36 MW 2.01 MW
941281 AE2-122 C Adder 12.22 MW 10.39 MW
941282 AE2-122 E Adder 49.31 MW 41.92 MW
942461 AE2-259 C Adder 6.07 MW 5.16 MW
942462 AE2-259 E Adder 4.05 MW 3.44 MW
944641 AF1-129 C Adder 64.31 MW 54.66 MW
316303 AF2-085 50/50 7.01 MW 7.01 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 17.91 MW 17.91 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.18 MW 11.18 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 40.08 MW 40.08 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.1 MW 2.1 MW
NY PJM->LTFIMP_NY CLTF 0.96 MW 0.96 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.72 MW 0.72 MW
WEC LTFEXP_WEC->PJM CLTF 0.37 MW 0.37 MW
CPLE LTFEXP_CPLE->PJM CLTF 4.63 MW 4.63 MW
TVA LTFEXP_TVA->PJM CLTF 2.92 MW 2.92 MW
MEC LTFEXP_MEC->PJM CLTF 2.11 MW 2.11 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.65 MW 3.65 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.14 MW 0.14 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 13.34 MW 13.34 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.21 MW 2.21 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Base Case OP AC 112.87 3220.44 A 3634.93 166.69
Elimination
Base Case Details for Eliminated Flowgate 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 8.28 MW 8.28 MW
963042 AG1-153 E 50/50 12.41 MW 12.41 MW
964801 AG1-343 C Adder 6.55 MW 5.57 MW
964802 AG1-343 E Adder 5.15 MW 4.38 MW
966811 AG1-552 C Adder 2.28 MW 1.94 MW
966812 AG1-552 E Adder 1.08 MW 0.92 MW
965291 AG1-394 C Adder 0.94 MW 0.8 MW
965292 AG1-394 E Adder 1.72 MW 1.47 MW
966621 AG1-532 C 50/50 1.56 MW 1.56 MW
966622 AG1-532 E 50/50 1.04 MW 1.04 MW
314541 3WATKINS Adder 0.75 MW 0.64 MW
314572 3EMPORIA Adder 0.48 MW 0.41 MW
315153 1CLOVER1 50/50 15.06 MW 15.06 MW
315154 1CLOVER2 50/50 14.92 MW 14.92 MW
918492 AA1-063AE OP Adder 4.51 MW 3.83 MW
919692 AA2-053 E OP Adder 4.69 MW 3.99 MW
920042 AA2-088 E OP Adder 11.62 MW 9.88 MW
934521 AD1-076 C Adder 13.52 MW 11.49 MW
934522 AD1-076 E Adder 6.89 MW 5.86 MW
942931 AE2-313 C 50/50 53.9 MW 53.9 MW
942932 AE2-313 E 50/50 35.93 MW 35.93 MW
944011 AF1-069 C 50/50 19.68 MW 19.68 MW
944012 AF1-069 E 50/50 7.64 MW 7.64 MW
960081 AF2-299 C 50/50 2.26 MW 2.26 MW
960082 AF2-299 E 50/50 1.5 MW 1.5 MW
900672 V4-068 E Adder 0.39 MW 0.33 MW
923263 AB1-132 E OP Adder 6.87 MW 5.84 MW
923573 AB1-173 E OP Adder 3.65 MW 3.1 MW
940492 AE2-034 E Adder 3.4 MW 2.89 MW
941031 AE2-094 C 50/50 60.22 MW 60.22 MW
941032 AE2-094 E 50/50 26.97 MW 26.97 MW
946281 AF1-292 C 50/50 1.72 MW 1.72 MW
946282 AF1-292 E 50/50 1.15 MW 1.15 MW
957481 AF2-042 C 50/50 71.92 MW 71.92 MW
957482 AF2-042 E 50/50 47.95 MW 47.95 MW
957521 AF2-046 C Adder 5.13 MW 4.36 MW
314539 3UNCAMP Adder 6.58 MW 5.59 MW
916042 Z1-036 E Adder 31.43 MW 26.71 MW
938771 AE1-103 C Adder 3.16 MW 2.69 MW
938772 AE1-103 E Adder 4.36 MW 3.71 MW
313526 AB2-022 C 50/50 0.38 MW 0.38 MW
314507 3THOMPSN Adder 2.17 MW 1.84 MW
314550 6HICKORY 50/50 2.38 MW 2.38 MW
926662 AC1-147 E Adder 1.42 MW 1.21 MW
926755 AC1-161 E 50/50 14.53 MW 14.53 MW
943612 AF1-032 E Adder 1.0 MW 0.85 MW
944871 AF1-152 C Adder 5.77 MW 4.9 MW
944872 AF1-152 E Adder 3.84 MW 3.27 MW
315102 1BRUNSWICKG1 50/50 11.32 MW 11.32 MW
315103 1BRUNSWICKG2 50/50 11.32 MW 11.32 MW
315104 1BRUNSWICKG3 50/50 11.32 MW 11.32 MW
315105 1BRUNSWICKS1 50/50 23.53 MW 23.53 MW
315108 1ELIZAR1 50/50 3.21 MW 3.21 MW
315109 1ELIZAR2 50/50 3.15 MW 3.15 MW
315110 1ELIZAR3 50/50 3.25 MW 3.25 MW
315241 1Z1-086 GT1 50/50 14.56 MW 14.56 MW
315242 1Z1-086 GT2 50/50 14.55 MW 14.55 MW
315243 1Z1-086 GT3 50/50 14.55 MW 14.55 MW
315244 1Z1-086 ST 50/50 25.34 MW 25.34 MW
315260 1GOSPORTA Adder 2.29 MW 1.95 MW
315261 1GOSPORTB Adder 2.92 MW 2.49 MW
315262 1GOSPORTC Adder 2.48 MW 2.11 MW
913392 Y1-086 E 50/50 2.4 MW 2.4 MW
916192 Z1-068 E 50/50 2.04 MW 2.04 MW
923832 AB2-022 E 50/50 1.36 MW 1.36 MW
923852 AB2-025 E 50/50 1.36 MW 1.36 MW
957492 AF2-043 E Adder 1.54 MW 1.31 MW
901082 W1-029 E Adder 34.79 MW 29.57 MW
917122 Z2-027 E 50/50 1.47 MW 1.47 MW
925522 AC1-027 E 50/50 1.32 MW 1.32 MW
941501 AE2-147 C Adder 17.3 MW 14.71 MW
941502 AE2-147 E Adder 11.53 MW 9.8 MW
957871 AF2-081 C 50/50 10.92 MW 10.92 MW
957872 AF2-081 E 50/50 4.68 MW 4.68 MW
958161 AF2-110 C Adder 1.46 MW 1.24 MW
958162 AF2-110 E Adder 2.32 MW 1.97 MW
926071 AC1-086 C Adder 23.62 MW 20.08 MW
926072 AC1-086 E Adder 10.75 MW 9.14 MW
933291 AC2-141 C 50/50 34.05 MW 34.05 MW
933292 AC2-141 E 50/50 14.53 MW 14.53 MW
939411 AE1-173 C 50/50 126.4 MW 126.4 MW
939412 AE1-173 E 50/50 84.27 MW 84.27 MW
916191 Z1-068 C 50/50 0.04 MW 0.04 MW
933981 AD1-022 C Adder 9.69 MW 8.23 MW
933982 AD1-022 E Adder 5.27 MW 4.48 MW
962572 AG1-106 E Adder 1.53 MW 1.3 MW
962571 AG1-106 C Adder 3.34 MW 2.84 MW
314594 6PLYMOUTH TP Adder 0.36 MW 0.3 MW
314632 6AYDLETT TAP 50/50 1.48 MW 1.48 MW
316023 AB2-100 C2 50/50 1.01 MW 1.01 MW
316185 AD1-033 C 50/50 1.25 MW 1.25 MW
316294 AC1-161 C 50/50 5.16 MW 5.16 MW
316315 AB2-025 C 50/50 0.44 MW 0.44 MW
316316 AC1-027 C 50/50 0.32 MW 0.32 MW
316320 Y1-086 C 50/50 0.22 MW 0.22 MW
316321 Z2-027 C 50/50 0.37 MW 0.37 MW
316365 AB2-100 C1 50/50 1.01 MW 1.01 MW
924516 AB2-100 E1 50/50 3.3 MW 3.3 MW
924517 AB2-100 E2 50/50 3.3 MW 3.3 MW
934065 AD1-033 E 50/50 5.48 MW 5.48 MW
937226 AE2-253 E 50/50 6.39 MW 6.39 MW
316017 AA1-139 ULT1 50/50 1.1 MW 1.1 MW
316018 AA1-139 ULT2 50/50 1.1 MW 1.1 MW
919153 AA1-139 E2 50/50 4.47 MW 4.47 MW
919152 AA1-139 E1 50/50 4.47 MW 4.47 MW
920692 AA2-178 E Adder 4.53 MW 3.85 MW
923994 AB2-040_E Adder 6.85 MW 5.82 MW
316088 AB2-174 E Adder 7.26 MW 6.17 MW
932046 AC2-012 E Adder 14.09 MW 11.97 MW
316388 AE2-253 GEN 50/50 1.99 MW 1.99 MW
941591 AE2-156 C Adder 19.28 MW 16.39 MW
944581 AF1-123 C 50/50 50.49 MW 50.49 MW
944582 AF1-123 E 50/50 115.61 MW 115.61 MW
944591 AF1-124 C 50/50 50.67 MW 50.67 MW
944592 AF1-124 E 50/50 116.03 MW 116.03 MW
944601 AF1-125 C 50/50 49.71 MW 49.71 MW
944602 AF1-125 E 50/50 113.79 MW 113.79 MW
965691 AG1-437 C Adder 11.21 MW 9.53 MW
965692 AG1-437 E Adder 7.47 MW 6.35 MW
965701 AG1-438 C Adder 11.21 MW 9.53 MW
965702 AG1-438 E Adder 7.47 MW 6.35 MW
965741 AG1-442 C Adder 6.54 MW 5.56 MW
965751 AG1-443 C Adder 6.54 MW 5.56 MW
965811 AG1-449 C 50/50 34.9 MW 34.9 MW
313764 3SOCKMAN Adder 0.79 MW 0.67 MW
934501 AD1-074 C Adder 37.22 MW 31.64 MW
934502 AD1-074 E Adder 18.95 MW 16.11 MW
934511 AD1-075 C Adder 9.31 MW 7.91 MW
934512 AD1-075 E Adder 4.74 MW 4.03 MW
934611 AD1-087 C 50/50 1.48 MW 1.48 MW
934612 AD1-087 E 50/50 4.61 MW 4.61 MW
935171 AD1-152 C 50/50 1.52 MW 1.52 MW
935172 AD1-152 E 50/50 6.74 MW 6.74 MW
937481 AD2-202 C 50/50 0.43 MW 0.43 MW
937482 AD2-202 E 50/50 1.35 MW 1.35 MW
938531 AE1-072 C 50/50 19.21 MW 19.21 MW
938532 AE1-072 E 50/50 10.01 MW 10.01 MW
940481 AE2-033 C 50/50 18.86 MW 18.86 MW
940482 AE2-033 E 50/50 12.71 MW 12.71 MW
940541 AE2-040 C 50/50 3.36 MW 3.36 MW
940641 AE2-051 C 50/50 25.69 MW 25.69 MW
940642 AE2-051 E 50/50 17.13 MW 17.13 MW
941101 AE2-104 C Adder 3.57 MW 3.04 MW
941102 AE2-104 E Adder 5.68 MW 4.83 MW
941281 AE2-122 C 50/50 30.89 MW 30.89 MW
941282 AE2-122 E 50/50 124.64 MW 124.64 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 41.4 MW 41.4 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 28.0 MW 28.0 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 114.55 MW 114.55 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.1 MW 4.1 MW
NY PJM->LTFIMP_NY CLTF 1.89 MW 1.89 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.64 MW 1.64 MW
WEC LTFEXP_WEC->PJM CLTF 0.85 MW 0.85 MW
CPLE LTFEXP_CPLE->PJM CLTF 13.65 MW 13.65 MW
TVA LTFEXP_TVA->PJM CLTF 7.47 MW 7.47 MW
MEC LTFEXP_MEC->PJM CLTF 5.05 MW 5.05 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.47 MW 9.47 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.32 MW 0.32 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 26.09 MW 26.09 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 6.51 MW 6.51 MW

Details for 6CHESTF B-6VARINA 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CHESTF B-6VARINA 230.0 kV Ckt 1 line
314287 to 314260 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 112.12 984.18 B 1103.43 46.31
Elimination
Base Case Details for Eliminated Flowgate 6CHESTF B-6VARINA 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.18 MW 0.15 MW
961942 AG1-037 E Adder 0.12 MW 0.1 MW
962331 AG1-082 C Adder 0.72 MW 0.62 MW
962332 AG1-082 E Adder 0.48 MW 0.41 MW
962341 AG1-083 C Adder 0.72 MW 0.62 MW
962342 AG1-083 E Adder 0.48 MW 0.41 MW
963041 AG1-153 C Adder 1.89 MW 1.61 MW
963042 AG1-153 E Adder 2.83 MW 2.41 MW
964801 AG1-343 C Adder 2.19 MW 1.86 MW
964802 AG1-343 E Adder 1.72 MW 1.46 MW
966811 AG1-552 C Adder 0.77 MW 0.66 MW
966812 AG1-552 E Adder 0.37 MW 0.31 MW
965291 AG1-394 C Adder 0.31 MW 0.27 MW
965292 AG1-394 E Adder 0.58 MW 0.49 MW
966621 AG1-532 C Adder 0.58 MW 0.5 MW
966622 AG1-532 E Adder 0.39 MW 0.33 MW
314541 3WATKINS Adder 0.25 MW 0.21 MW
314572 3EMPORIA Adder 0.18 MW 0.15 MW
918492 AA1-063AE OP Adder 1.52 MW 1.29 MW
919692 AA2-053 E OP Adder 1.58 MW 1.34 MW
920042 AA2-088 E OP Adder 3.89 MW 3.31 MW
925785 AC1-054 E Adder 1.14 MW 0.97 MW
927146 AC1-208 E Adder 1.44 MW 1.23 MW
934521 AD1-076 C Adder 4.19 MW 3.56 MW
934522 AD1-076 E Adder 2.13 MW 1.81 MW
942931 AE2-313 C Adder 12.24 MW 10.4 MW
942932 AE2-313 E Adder 8.16 MW 6.94 MW
943172 AE2-346 E Adder 0.22 MW 0.18 MW
944011 AF1-069 C Adder 4.46 MW 3.79 MW
944012 AF1-069 E Adder 1.73 MW 1.47 MW
960081 AF2-299 C Adder 0.84 MW 0.72 MW
960082 AF2-299 E Adder 0.56 MW 0.48 MW
316141 AB2-099 E Adder 0.09 MW 0.08 MW
900672 V4-068 E Adder 0.13 MW 0.11 MW
923263 AB1-132 E OP Adder 2.48 MW 2.11 MW
923573 AB1-173 E OP Adder 1.31 MW 1.11 MW
940492 AE2-034 E Adder 1.04 MW 0.89 MW
941031 AE2-094 C Adder 13.63 MW 11.59 MW
941032 AE2-094 E Adder 6.11 MW 5.19 MW
946281 AF1-292 C Adder 0.65 MW 0.55 MW
946282 AF1-292 E Adder 0.43 MW 0.37 MW
957481 AF2-042 C Adder 16.9 MW 14.36 MW
957482 AF2-042 E Adder 11.26 MW 9.57 MW
957521 AF2-046 C Adder 5.73 MW 4.87 MW
957522 AF2-046 E Adder 2.89 MW 2.46 MW
314539 3UNCAMP Adder 2.21 MW 1.88 MW
916042 Z1-036 E Adder 9.49 MW 8.07 MW
938771 AE1-103 C Adder 1.06 MW 0.9 MW
938772 AE1-103 E Adder 1.47 MW 1.25 MW
314331 6POE 50/50 1.05 MW 1.05 MW
314507 3THOMPSN Adder 0.65 MW 0.56 MW
314525 6KINGFORK Adder 0.34 MW 0.29 MW
314550 6HICKORY Adder 0.69 MW 0.59 MW
315065 1CHESTF6 50/50 22.43 MW 22.43 MW
315073 1STONECA 50/50 4.29 MW 4.29 MW
315076 1HOPPOLC 50/50 0.88 MW 0.88 MW
315077 1HOPHCF1 50/50 1.41 MW 1.41 MW
315078 1HOPHCF2 50/50 1.41 MW 1.41 MW
315079 1HOPHCF3 50/50 1.41 MW 1.41 MW
315080 1HOPHCF4 50/50 2.13 MW 2.13 MW
926662 AC1-147 E Adder 0.43 MW 0.36 MW
927226 AC1-216 E Adder 3.91 MW 3.32 MW
935112 AD1-144 E Adder 0.31 MW 0.27 MW
942162 AE2-228 E 50/50 1.56 MW 1.56 MW
942341 AE2-247 C Adder 0.65 MW 0.55 MW
942342 AE2-247 E Adder 0.9 MW 0.77 MW
943461 AF1-017 C Adder 0.59 MW 0.5 MW
943462 AF1-017 E Adder 0.96 MW 0.82 MW
943612 AF1-032 E Adder 0.3 MW 0.26 MW
944871 AF1-152 C Adder 1.73 MW 1.47 MW
944872 AF1-152 E Adder 1.15 MW 0.98 MW
315260 1GOSPORTA Adder 0.69 MW 0.59 MW
315261 1GOSPORTB Adder 0.88 MW 0.75 MW
315262 1GOSPORTC Adder 0.75 MW 0.64 MW
913392 Y1-086 E Adder 0.71 MW 0.6 MW
916192 Z1-068 E Adder 0.6 MW 0.51 MW
923832 AB2-022 E Adder 0.4 MW 0.34 MW
923852 AB2-025 E Adder 0.61 MW 0.52 MW
939312 AE1-162 E Adder 0.54 MW 0.46 MW
946262 AF1-291 E 50/50 1.59 MW 1.59 MW
957492 AF2-043 E Adder 0.47 MW 0.4 MW
901082 W1-029 E Adder 10.44 MW 8.88 MW
917122 Z2-027 E Adder 0.44 MW 0.37 MW
925332 AB2-190 E Adder 4.45 MW 3.79 MW
925522 AC1-027 E Adder 0.39 MW 0.33 MW
941501 AE2-147 C Adder 5.19 MW 4.41 MW
941502 AE2-147 E Adder 3.46 MW 2.94 MW
942001 AE2-212 C 50/50 2.05 MW 2.05 MW
942002 AE2-212 E 50/50 1.37 MW 1.37 MW
957871 AF2-081 C Adder 3.18 MW 2.71 MW
957872 AF2-081 E Adder 1.36 MW 1.16 MW
958161 AF2-110 C Adder 0.49 MW 0.42 MW
958162 AF2-110 E Adder 0.78 MW 0.66 MW
926071 AC1-086 C Adder 8.52 MW 7.25 MW
926072 AC1-086 E Adder 3.88 MW 3.3 MW
939411 AE1-173 C Adder 30.1 MW 25.59 MW
939412 AE1-173 E Adder 20.07 MW 17.06 MW
934011 AD1-025 C Adder 8.54 MW 7.26 MW
934012 AD1-025 E Adder 5.06 MW 4.3 MW
933981 AD1-022 C Adder 3.02 MW 2.57 MW
933982 AD1-022 E Adder 1.65 MW 1.4 MW
962572 AG1-106 E Adder 0.55 MW 0.47 MW
961681 AG1-008 C Adder 5.73 MW 4.87 MW
961682 AG1-008 E Adder 2.89 MW 2.46 MW
962571 AG1-106 C Adder 1.21 MW 1.02 MW
314594 6PLYMOUTH TP Adder 0.11 MW 0.09 MW
314632 6AYDLETT TAP Adder 0.43 MW 0.37 MW
316210 AC1-098 C Adder 2.2 MW 1.87 MW
316212 AC1-099 C Adder 0.74 MW 0.62 MW
316240 AF1-291 C 50/50 2.38 MW 2.38 MW
316274 AC1-208 C Adder 3.25 MW 2.76 MW
316301 AE2-228 C 50/50 2.33 MW 2.33 MW
917332 KELFORD E Adder 0.59 MW 0.5 MW
924516 AB2-100 E1 Adder 1.32 MW 1.12 MW
924517 AB2-100 E2 Adder 1.32 MW 1.12 MW
926206 AC1-098 E Adder 1.31 MW 1.11 MW
926214 AC1-099 E Adder 0.43 MW 0.37 MW
934065 AD1-033 E Adder 1.59 MW 1.35 MW
937226 AE2-253 E Adder 1.86 MW 1.58 MW
963221 AG1-171 C Adder 1.09 MW 0.93 MW
963222 AG1-171 E Adder 0.72 MW 0.62 MW
963231 AG1-172 C Adder 1.09 MW 0.93 MW
963232 AG1-172 E Adder 0.72 MW 0.62 MW
963241 AG1-173 C Adder 1.09 MW 0.93 MW
963242 AG1-173 E Adder 0.72 MW 0.62 MW
918512 AA1-065 E OP Adder 1.96 MW 1.66 MW
919153 AA1-139 E2 Adder 1.3 MW 1.11 MW
919152 AA1-139 E1 Adder 1.3 MW 1.11 MW
919710 AA2-057 E Adder 1.4 MW 1.19 MW
920692 AA2-178 E Adder 1.39 MW 1.18 MW
923994 AB2-040_E Adder 2.45 MW 2.08 MW
924814 AB2-134 E Adder 6.4 MW 5.44 MW
316084 AB2-161 E Adder 3.08 MW 2.62 MW
925122 AB2-169 E Adder 1.96 MW 1.67 MW
316088 AB2-174 E Adder 2.64 MW 2.24 MW
932046 AC2-012 E Adder 4.24 MW 3.6 MW
316311 AC2-079 C Adder 2.45 MW 2.08 MW
932596 AC2-079 E Adder 4.0 MW 3.4 MW
934576 AD1-082 E Adder 2.45 MW 2.08 MW
316349 AD2-085 C Adder 1.5 MW 1.28 MW
936666 AD2-085 E Adder 2.46 MW 2.09 MW
961611 AG1-000B C Adder 6.94 MW 5.89 MW
941591 AE2-156 C Adder 5.78 MW 4.91 MW
942371 AE2-250 C 50/50 5.41 MW 5.41 MW
942372 AE2-250 E 50/50 2.85 MW 2.85 MW
944582 AF1-123 E Adder 32.12 MW 27.3 MW
944591 AF1-124 C Adder 13.59 MW 11.55 MW
944592 AF1-124 E Adder 32.24 MW 27.4 MW
944602 AF1-125 E Adder 31.62 MW 26.87 MW
962271 AG1-075 C 50/50 9.34 MW 9.34 MW
962272 AG1-075 E 50/50 5.69 MW 5.69 MW
965281 AG1-393 C 50/50 1.2 MW 1.2 MW
965282 AG1-393 E 50/50 0.8 MW 0.8 MW
965601 AG1-428 C Adder 1.75 MW 1.49 MW
965602 AG1-428 E Adder 1.17 MW 0.99 MW
965691 AG1-437 C Adder 3.52 MW 2.99 MW
965692 AG1-437 E Adder 2.35 MW 2.0 MW
965701 AG1-438 C Adder 3.52 MW 2.99 MW
965702 AG1-438 E Adder 2.35 MW 2.0 MW
965741 AG1-442 C Adder 2.05 MW 1.75 MW
965751 AG1-443 C Adder 2.05 MW 1.75 MW
965811 AG1-449 C Adder 7.93 MW 6.74 MW
313764 3SOCKMAN Adder 0.28 MW 0.23 MW
932631 AC2-084 C Adder 2.35 MW 2.0 MW
932632 AC2-084 E Adder 1.16 MW 0.98 MW
934321 AD1-056 C Adder 2.32 MW 1.97 MW
934322 AD1-056 E Adder 1.26 MW 1.07 MW
934331 AD1-057 C Adder 1.29 MW 1.1 MW
934332 AD1-057 E Adder 0.67 MW 0.57 MW
934501 AD1-074 C Adder 11.53 MW 9.8 MW
934502 AD1-074 E Adder 5.87 MW 4.99 MW
934511 AD1-075 C Adder 2.88 MW 2.45 MW
934512 AD1-075 E Adder 1.47 MW 1.25 MW
935161 AD1-151 C Adder 8.56 MW 7.28 MW
935162 AD1-151 E Adder 5.71 MW 4.85 MW
938531 AE1-072 C Adder 5.61 MW 4.77 MW
938532 AE1-072 E Adder 2.93 MW 2.49 MW
939191 AE1-149 C 50/50 6.86 MW 6.86 MW
939192 AE1-149 E 50/50 4.57 MW 4.57 MW
940431 AE2-027 C Adder 6.64 MW 5.65 MW
940432 AE2-027 E Adder 4.43 MW 3.77 MW
940481 AE2-033 C Adder 8.34 MW 7.09 MW
940482 AE2-033 E Adder 5.62 MW 4.78 MW
940541 AE2-040 C Adder 1.51 MW 1.28 MW
940641 AE2-051 C Adder 5.84 MW 4.97 MW
940642 AE2-051 E Adder 3.89 MW 3.31 MW
941101 AE2-104 C Adder 1.2 MW 1.02 MW
941102 AE2-104 E Adder 1.91 MW 1.63 MW
941281 AE2-122 C Adder 9.09 MW 7.73 MW
941282 AE2-122 E Adder 36.69 MW 31.19 MW
944641 AF1-129 C 50/50 116.98 MW 116.98 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 9.1 MW 9.1 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.55 MW 6.55 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 28.66 MW 28.66 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.0 MW 1.0 MW
NY PJM->LTFIMP_NY CLTF 0.47 MW 0.47 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.36 MW 0.36 MW
WEC LTFEXP_WEC->PJM CLTF 0.19 MW 0.19 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.5 MW 3.5 MW
TVA LTFEXP_TVA->PJM CLTF 1.77 MW 1.77 MW
MEC LTFEXP_MEC->PJM CLTF 1.15 MW 1.15 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.26 MW 2.26 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.38 MW 6.38 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.67 MW 1.67 MW

Details for 6HOPEWLL-6CHESTF A 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6HOPEWLL-6CHESTF A 230.0 kV Ckt 1 line
314303 to 314286 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 102.7 984.18 B 1010.78 62.41
Elimination
Base Case Details for Eliminated Flowgate 6HOPEWLL-6CHESTF A 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314541 3WATKINS Adder 0.3 MW 0.25 MW
920042 AA2-088 E OP Adder 4.29 MW 3.65 MW
940492 AE2-034 E Adder 1.27 MW 1.08 MW
314539 3UNCAMP Adder 2.67 MW 2.27 MW
916042 Z1-036 E Adder 12.23 MW 10.4 MW
938771 AE1-103 C Adder 1.3 MW 1.11 MW
938772 AE1-103 E Adder 1.8 MW 1.53 MW
314331 6POE Adder 0.87 MW 0.74 MW
314507 3THOMPSN Adder 0.98 MW 0.83 MW
314525 6KINGFORK Adder 0.51 MW 0.44 MW
314550 6HICKORY Adder 0.97 MW 0.82 MW
315065 1CHESTF6 Adder 15.3 MW 13.01 MW
315073 1STONECA 50/50 13.61 MW 13.61 MW
315076 1HOPPOLC 50/50 2.8 MW 2.8 MW
315077 1HOPHCF1 50/50 4.46 MW 4.46 MW
315078 1HOPHCF2 50/50 4.46 MW 4.46 MW
315079 1HOPHCF3 50/50 4.46 MW 4.46 MW
315080 1HOPHCF4 50/50 6.76 MW 6.76 MW
926662 AC1-147 E Adder 0.64 MW 0.55 MW
927226 AC1-216 E 50/50 10.91 MW 10.91 MW
935112 AD1-144 E Adder 0.48 MW 0.41 MW
942162 AE2-228 E Adder 1.06 MW 0.91 MW
942341 AE2-247 C Adder 0.85 MW 0.72 MW
942342 AE2-247 E Adder 1.18 MW 1.0 MW
943461 AF1-017 C Adder 0.77 MW 0.66 MW
943462 AF1-017 E Adder 1.26 MW 1.07 MW
943612 AF1-032 E Adder 0.41 MW 0.35 MW
944871 AF1-152 C Adder 2.3 MW 1.96 MW
944872 AF1-152 E Adder 1.53 MW 1.3 MW
315116 1SURRY 1 50/50 21.81 MW 21.81 MW
315119 1GRAVEL3 50/50 2.22 MW 2.22 MW
315120 1GRAVEL4 50/50 2.24 MW 2.24 MW
315121 1GRAVEL5 50/50 2.22 MW 2.22 MW
315122 1GRAVEL6 50/50 2.24 MW 2.24 MW
315260 1GOSPORTA Adder 1.04 MW 0.88 MW
315261 1GOSPORTB Adder 1.32 MW 1.12 MW
315262 1GOSPORTC Adder 1.12 MW 0.95 MW
316132 AB2-190 C 50/50 6.44 MW 6.44 MW
913392 Y1-086 E Adder 0.96 MW 0.82 MW
916192 Z1-068 E Adder 0.87 MW 0.74 MW
923832 AB2-022 E Adder 0.54 MW 0.46 MW
923852 AB2-025 E Adder 0.48 MW 0.41 MW
939312 AE1-162 E Adder 1.11 MW 0.94 MW
946262 AF1-291 E Adder 1.1 MW 0.94 MW
957492 AF2-043 E Adder 0.64 MW 0.54 MW
901082 W1-029 E Adder 13.88 MW 11.79 MW
917122 Z2-027 E Adder 0.59 MW 0.5 MW
925332 AB2-190 E 50/50 13.18 MW 13.18 MW
925522 AC1-027 E Adder 0.57 MW 0.48 MW
941501 AE2-147 C Adder 6.9 MW 5.87 MW
941502 AE2-147 E Adder 4.6 MW 3.91 MW
942001 AE2-212 C Adder 1.41 MW 1.2 MW
942002 AE2-212 E Adder 0.94 MW 0.8 MW
957871 AF2-081 C Adder 4.41 MW 3.75 MW
957872 AF2-081 E Adder 1.89 MW 1.61 MW
958161 AF2-110 C Adder 0.65 MW 0.56 MW
958162 AF2-110 E Adder 1.04 MW 0.88 MW
934011 AD1-025 C 50/50 23.84 MW 23.84 MW
934012 AD1-025 E 50/50 14.12 MW 14.12 MW
314632 6AYDLETT TAP Adder 0.6 MW 0.51 MW
316240 AF1-291 C Adder 1.65 MW 1.4 MW
316301 AE2-228 C Adder 1.6 MW 1.36 MW
316304 AE2-227 C Adder -2.34 MW -1.99 MW
316369 AC1-216 C 50/50 2.1 MW 2.1 MW
934065 AD1-033 E Adder 2.24 MW 1.9 MW
937226 AE2-253 E Adder 2.58 MW 2.19 MW
963221 AG1-171 C 50/50 3.04 MW 3.04 MW
963222 AG1-171 E 50/50 2.02 MW 2.02 MW
963231 AG1-172 C 50/50 3.04 MW 3.04 MW
963232 AG1-172 E 50/50 2.02 MW 2.02 MW
963241 AG1-173 C 50/50 3.04 MW 3.04 MW
963242 AG1-173 E 50/50 2.02 MW 2.02 MW
919153 AA1-139 E2 Adder 1.8 MW 1.53 MW
919152 AA1-139 E1 Adder 1.8 MW 1.53 MW
920692 AA2-178 E Adder 1.69 MW 1.43 MW
316033 AB2-134 GEN 50/50 2.75 MW 2.75 MW
924814 AB2-134 E 50/50 17.87 MW 17.87 MW
316084 AB2-161 E Adder 3.94 MW 3.35 MW
932046 AC2-012 E Adder 6.37 MW 5.42 MW
316311 AC2-079 C Adder 3.21 MW 2.73 MW
932596 AC2-079 E Adder 5.23 MW 4.45 MW
934576 AD1-082 E Adder 3.14 MW 2.67 MW
316349 AD2-085 C Adder 1.96 MW 1.67 MW
936666 AD2-085 E Adder 3.2 MW 2.72 MW
961611 AG1-000B C 50/50 17.1 MW 17.1 MW
941591 AE2-156 C Adder 8.66 MW 7.36 MW
944581 AF1-123 C Adder 18.9 MW 16.07 MW
944582 AF1-123 E Adder 43.28 MW 36.79 MW
944591 AF1-124 C Adder 18.97 MW 16.12 MW
944592 AF1-124 E Adder 43.44 MW 36.92 MW
944601 AF1-125 C Adder 18.61 MW 15.82 MW
944602 AF1-125 E Adder 42.6 MW 36.21 MW
935161 AD1-151 C 50/50 24.7 MW 24.7 MW
935162 AD1-151 E 50/50 16.47 MW 16.47 MW
938531 AE1-072 C Adder 7.74 MW 6.58 MW
938532 AE1-072 E Adder 4.03 MW 3.43 MW
939191 AE1-149 C Adder 8.7 MW 7.39 MW
939192 AE1-149 E Adder 5.8 MW 4.93 MW
940481 AE2-033 C Adder 6.65 MW 5.65 MW
940482 AE2-033 E Adder 4.48 MW 3.81 MW
940541 AE2-040 C Adder 1.19 MW 1.01 MW
941101 AE2-104 C Adder 1.6 MW 1.36 MW
941102 AE2-104 E Adder 2.55 MW 2.17 MW
941281 AE2-122 C Adder 13.14 MW 11.17 MW
941282 AE2-122 E Adder 53.01 MW 45.06 MW
944641 AF1-129 C Adder 79.82 MW 67.84 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 5.24 MW 5.24 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 4.59 MW 4.59 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 23.18 MW 23.18 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.91 MW 0.91 MW
NY PJM->LTFIMP_NY CLTF 0.43 MW 0.43 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.22 MW 0.22 MW
WEC LTFEXP_WEC->PJM CLTF 0.11 MW 0.11 MW
CPLE LTFEXP_CPLE->PJM CLTF 2.92 MW 2.92 MW
TVA LTFEXP_TVA->PJM CLTF 1.3 MW 1.3 MW
MEC LTFEXP_MEC->PJM CLTF 0.74 MW 0.74 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.66 MW 1.66 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.04 MW 0.04 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 5.78 MW 5.78 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.39 MW 1.39 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Base Case OP AC 103.1 3193.18 A 3292.2 164.54
Elimination
Base Case Details for Eliminated Flowgate 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 7.23 MW 7.23 MW
963042 AG1-153 E 50/50 10.85 MW 10.85 MW
964801 AG1-343 C Adder 6.59 MW 5.6 MW
964802 AG1-343 E Adder 5.18 MW 4.4 MW
966811 AG1-552 C Adder 2.29 MW 1.94 MW
966812 AG1-552 E Adder 1.09 MW 0.92 MW
965291 AG1-394 C Adder 0.94 MW 0.8 MW
965292 AG1-394 E Adder 1.73 MW 1.47 MW
966621 AG1-532 C 50/50 1.58 MW 1.58 MW
966622 AG1-532 E 50/50 1.05 MW 1.05 MW
314541 3WATKINS Adder 0.76 MW 0.65 MW
314572 3EMPORIA Adder 0.48 MW 0.41 MW
315153 1CLOVER1 50/50 14.09 MW 14.09 MW
315154 1CLOVER2 50/50 13.96 MW 13.96 MW
918492 AA1-063AE OP Adder 4.53 MW 3.85 MW
919692 AA2-053 E OP Adder 4.69 MW 3.99 MW
920042 AA2-088 E OP Adder 11.7 MW 9.95 MW
942931 AE2-313 C 50/50 46.94 MW 46.94 MW
942932 AE2-313 E 50/50 31.29 MW 31.29 MW
944011 AF1-069 C 50/50 17.05 MW 17.05 MW
944012 AF1-069 E 50/50 6.62 MW 6.62 MW
960081 AF2-299 C 50/50 2.28 MW 2.28 MW
960082 AF2-299 E 50/50 1.52 MW 1.52 MW
900672 V4-068 E Adder 0.39 MW 0.33 MW
923263 AB1-132 E OP Adder 6.84 MW 5.81 MW
923573 AB1-173 E OP Adder 3.68 MW 3.12 MW
940492 AE2-034 E Adder 3.38 MW 2.87 MW
941031 AE2-094 C 50/50 52.17 MW 52.17 MW
941032 AE2-094 E 50/50 23.37 MW 23.37 MW
946281 AF1-292 C 50/50 1.74 MW 1.74 MW
946282 AF1-292 E 50/50 1.16 MW 1.16 MW
957481 AF2-042 C 50/50 66.1 MW 66.1 MW
957482 AF2-042 E 50/50 44.07 MW 44.07 MW
957521 AF2-046 C Adder 17.39 MW 14.79 MW
957522 AF2-046 E Adder 8.79 MW 7.47 MW
314539 3UNCAMP Adder 6.67 MW 5.67 MW
916042 Z1-036 E Adder 31.35 MW 26.65 MW
938771 AE1-103 C Adder 3.21 MW 2.73 MW
938772 AE1-103 E Adder 4.43 MW 3.77 MW
933502 AC2-165 E Adder 8.32 MW 7.07 MW
314331 6POE 50/50 1.51 MW 1.51 MW
314507 3THOMPSN Adder 2.19 MW 1.86 MW
314525 6KINGFORK Adder 1.08 MW 0.91 MW
314550 6HICKORY 50/50 2.38 MW 2.38 MW
926662 AC1-147 E Adder 1.44 MW 1.22 MW
926755 AC1-161 E 50/50 14.1 MW 14.1 MW
935112 AD1-144 E Adder 1.0 MW 0.85 MW
942341 AE2-247 C Adder 1.61 MW 1.37 MW
942342 AE2-247 E Adder 2.23 MW 1.89 MW
943461 AF1-017 C Adder 1.46 MW 1.24 MW
943462 AF1-017 E Adder 2.38 MW 2.02 MW
943612 AF1-032 E Adder 1.01 MW 0.85 MW
944871 AF1-152 C Adder 5.76 MW 4.9 MW
944872 AF1-152 E Adder 3.84 MW 3.27 MW
958502 AF2-144 E 50/50 1.42 MW 1.42 MW
315102 1BRUNSWICKG1 50/50 9.9 MW 9.9 MW
315103 1BRUNSWICKG2 50/50 9.9 MW 9.9 MW
315104 1BRUNSWICKG3 50/50 9.9 MW 9.9 MW
315105 1BRUNSWICKS1 50/50 20.56 MW 20.56 MW
315108 1ELIZAR1 50/50 3.22 MW 3.22 MW
315110 1ELIZAR3 50/50 3.26 MW 3.26 MW
315241 1Z1-086 GT1 50/50 12.69 MW 12.69 MW
315242 1Z1-086 GT2 50/50 12.68 MW 12.68 MW
315243 1Z1-086 GT3 50/50 12.68 MW 12.68 MW
315244 1Z1-086 ST 50/50 22.09 MW 22.09 MW
315260 1GOSPORTA Adder 2.31 MW 1.96 MW
315261 1GOSPORTB Adder 2.95 MW 2.51 MW
315262 1GOSPORTC Adder 2.5 MW 2.13 MW
913392 Y1-086 E Adder 2.4 MW 2.04 MW
916192 Z1-068 E 50/50 2.04 MW 2.04 MW
923832 AB2-022 E Adder 1.35 MW 1.15 MW
923852 AB2-025 E 50/50 1.36 MW 1.36 MW
923862 AB2-026 E 50/50 1.45 MW 1.45 MW
938552 AE1-074 E 50/50 1.52 MW 1.52 MW
938562 AE1-075 E 50/50 1.23 MW 1.23 MW
957492 AF2-043 E Adder 1.55 MW 1.32 MW
901082 W1-029 E Adder 34.78 MW 29.56 MW
917122 Z2-027 E Adder 1.46 MW 1.25 MW
925522 AC1-027 E 50/50 1.32 MW 1.32 MW
941501 AE2-147 C Adder 17.29 MW 14.7 MW
941502 AE2-147 E Adder 11.53 MW 9.8 MW
957871 AF2-081 C 50/50 10.89 MW 10.89 MW
957872 AF2-081 E 50/50 4.67 MW 4.67 MW
958161 AF2-110 C Adder 1.49 MW 1.26 MW
958162 AF2-110 E Adder 2.37 MW 2.01 MW
926071 AC1-086 C Adder 23.5 MW 19.97 MW
926072 AC1-086 E Adder 10.7 MW 9.09 MW
933291 AC2-141 C 50/50 33.02 MW 33.02 MW
933292 AC2-141 E 50/50 14.1 MW 14.1 MW
939411 AE1-173 C 50/50 113.34 MW 113.34 MW
939412 AE1-173 E 50/50 75.56 MW 75.56 MW
916191 Z1-068 C 50/50 0.04 MW 0.04 MW
962572 AG1-106 E Adder 1.52 MW 1.29 MW
961681 AG1-008 C Adder 17.39 MW 14.79 MW
961682 AG1-008 E Adder 8.79 MW 7.47 MW
962571 AG1-106 C Adder 3.32 MW 2.83 MW
314594 6PLYMOUTH TP Adder 0.35 MW 0.3 MW
314632 6AYDLETT TAP Adder 1.48 MW 1.26 MW
316023 AB2-100 C2 50/50 1.02 MW 1.02 MW
316185 AD1-033 C 50/50 1.24 MW 1.24 MW
316233 AE1-074 C 50/50 3.01 MW 3.01 MW
316258 AE1-075 C 50/50 0.38 MW 0.38 MW
316294 AC1-161 C 50/50 5.0 MW 5.0 MW
316313 AB2-026 C 50/50 0.41 MW 0.41 MW
316315 AB2-025 C 50/50 0.44 MW 0.44 MW
316316 AC1-027 C 50/50 0.32 MW 0.32 MW
316336 AC2-165 C Adder 11.05 MW 9.39 MW
316365 AB2-100 C1 50/50 1.02 MW 1.02 MW
316405 AF2-144 C 50/50 0.32 MW 0.32 MW
924516 AB2-100 E1 50/50 3.3 MW 3.3 MW
924517 AB2-100 E2 50/50 3.3 MW 3.3 MW
934065 AD1-033 E 50/50 5.46 MW 5.46 MW
937226 AE2-253 E 50/50 6.37 MW 6.37 MW
316017 AA1-139 ULT1 50/50 1.09 MW 1.09 MW
316018 AA1-139 ULT2 50/50 1.09 MW 1.09 MW
919153 AA1-139 E2 50/50 4.45 MW 4.45 MW
919152 AA1-139 E1 50/50 4.45 MW 4.45 MW
920692 AA2-178 E Adder 4.5 MW 3.83 MW
923994 AB2-040_E Adder 6.89 MW 5.86 MW
316084 AB2-161 E Adder 5.92 MW 5.03 MW
316088 AB2-174 E Adder 7.32 MW 6.22 MW
932046 AC2-012 E Adder 14.2 MW 12.07 MW
316311 AC2-079 C Adder 6.2 MW 5.27 MW
932596 AC2-079 E Adder 10.12 MW 8.61 MW
934576 AD1-082 E Adder 4.71 MW 4.01 MW
316349 AD2-085 C Adder 3.72 MW 3.16 MW
936666 AD2-085 E Adder 6.07 MW 5.16 MW
316388 AE2-253 GEN 50/50 1.99 MW 1.99 MW
941591 AE2-156 C Adder 19.42 MW 16.5 MW
944581 AF1-123 C 50/50 49.84 MW 49.84 MW
944582 AF1-123 E 50/50 114.12 MW 114.12 MW
944591 AF1-124 C 50/50 50.01 MW 50.01 MW
944592 AF1-124 E 50/50 114.53 MW 114.53 MW
944601 AF1-125 C 50/50 49.07 MW 49.07 MW
944602 AF1-125 E 50/50 112.33 MW 112.33 MW
965601 AG1-428 C Adder 5.31 MW 4.51 MW
965602 AG1-428 E Adder 3.54 MW 3.01 MW
965811 AG1-449 C 50/50 30.4 MW 30.4 MW
313764 3SOCKMAN Adder 0.8 MW 0.68 MW
934501 AD1-074 C Adder 13.17 MW 11.2 MW
934611 AD1-087 C 50/50 1.39 MW 1.39 MW
934612 AD1-087 E 50/50 4.32 MW 4.32 MW
935171 AD1-152 C 50/50 1.43 MW 1.43 MW
935172 AD1-152 E 50/50 6.36 MW 6.36 MW
937481 AD2-202 C 50/50 0.4 MW 0.4 MW
937482 AD2-202 E 50/50 1.26 MW 1.26 MW
938531 AE1-072 C Adder 19.15 MW 16.28 MW
938532 AE1-072 E Adder 9.98 MW 8.49 MW
939191 AE1-149 C Adder 11.4 MW 9.69 MW
939192 AE1-149 E Adder 7.6 MW 6.46 MW
940481 AE2-033 C 50/50 18.92 MW 18.92 MW
940482 AE2-033 E 50/50 12.76 MW 12.76 MW
940541 AE2-040 C 50/50 3.37 MW 3.37 MW
940641 AE2-051 C 50/50 22.47 MW 22.47 MW
940642 AE2-051 E 50/50 14.98 MW 14.98 MW
941101 AE2-104 C Adder 3.65 MW 3.1 MW
941102 AE2-104 E Adder 5.8 MW 4.93 MW
941281 AE2-122 C 50/50 30.94 MW 30.94 MW
941282 AE2-122 E 50/50 124.83 MW 124.83 MW
316303 AF2-085 50/50 5.35 MW 5.35 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 43.0 MW 43.0 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 28.14 MW 28.14 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 109.49 MW 109.49 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.58 MW 4.58 MW
NY PJM->LTFIMP_NY CLTF 2.1 MW 2.1 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.71 MW 1.71 MW
WEC LTFEXP_WEC->PJM CLTF 0.89 MW 0.89 MW
CPLE LTFEXP_CPLE->PJM CLTF 12.9 MW 12.9 MW
TVA LTFEXP_TVA->PJM CLTF 7.44 MW 7.44 MW
MEC LTFEXP_MEC->PJM CLTF 5.17 MW 5.17 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.39 MW 9.39 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.33 MW 0.33 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 29.15 MW 29.15 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 6.15 MW 6.15 MW

Details for 6SKIFF CREEK-6WALR285 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6SKIFF CREEK-6WALR285 230.0 kV Ckt 1 line
314209 to 314413 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 103.53 678.68 B 702.63 67.98
Elimination
Base Case Details for Eliminated Flowgate 6SKIFF CREEK-6WALR285 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.16 MW 0.14 MW
961942 AG1-037 E Adder 0.11 MW 0.09 MW
962331 AG1-082 C Adder 0.64 MW 0.55 MW
962332 AG1-082 E Adder 0.43 MW 0.36 MW
962341 AG1-083 C Adder 0.64 MW 0.55 MW
962342 AG1-083 E Adder 0.43 MW 0.36 MW
964801 AG1-343 C Adder 1.91 MW 1.63 MW
964802 AG1-343 E Adder 1.5 MW 1.28 MW
965291 AG1-394 C Adder 0.27 MW 0.23 MW
965292 AG1-394 E Adder 0.5 MW 0.43 MW
314541 3WATKINS Adder 0.24 MW 0.21 MW
920042 AA2-088 E OP Adder 3.45 MW 2.93 MW
934521 AD1-076 C Adder 4.44 MW 3.77 MW
934522 AD1-076 E Adder 2.26 MW 1.92 MW
943172 AE2-346 E Adder 0.19 MW 0.16 MW
316141 AB2-099 E Adder 0.08 MW 0.07 MW
900672 V4-068 E Adder 0.11 MW 0.1 MW
940492 AE2-034 E Adder 1.17 MW 1.0 MW
957521 AF2-046 C Adder 5.04 MW 4.29 MW
957522 AF2-046 E Adder 2.55 MW 2.17 MW
314539 3UNCAMP Adder 2.21 MW 1.88 MW
916042 Z1-036 E Adder 11.74 MW 9.97 MW
938771 AE1-103 C Adder 1.09 MW 0.92 MW
938772 AE1-103 E Adder 1.5 MW 1.27 MW
314421 6WINCHST 50/50 0.1 MW 0.1 MW
314507 3THOMPSN Adder 0.89 MW 0.76 MW
314525 6KINGFORK Adder 0.48 MW 0.41 MW
314550 6HICKORY Adder 0.97 MW 0.82 MW
315092 1YORKTN3 50/50 124.61 MW 124.61 MW
926662 AC1-147 E Adder 0.59 MW 0.5 MW
926755 AC1-161 E Adder 6.39 MW 5.43 MW
935112 AD1-144 E Adder 0.44 MW 0.38 MW
942341 AE2-247 C Adder 0.5 MW 0.42 MW
942342 AE2-247 E Adder 0.69 MW 0.59 MW
943461 AF1-017 C Adder 0.45 MW 0.38 MW
943462 AF1-017 E Adder 0.74 MW 0.63 MW
943612 AF1-032 E Adder 0.41 MW 0.35 MW
944871 AF1-152 C Adder 2.24 MW 1.91 MW
944872 AF1-152 E Adder 1.5 MW 1.27 MW
315233 1SURRY 2 50/50 13.25 MW 13.25 MW
315260 1GOSPORTA Adder 0.94 MW 0.8 MW
315261 1GOSPORTB Adder 1.21 MW 1.02 MW
315262 1GOSPORTC Adder 1.02 MW 0.87 MW
913392 Y1-086 E Adder 0.95 MW 0.81 MW
916192 Z1-068 E Adder 0.84 MW 0.71 MW
923832 AB2-022 E Adder 0.54 MW 0.46 MW
939312 AE1-162 E Adder 0.58 MW 0.49 MW
957492 AF2-043 E Adder 0.63 MW 0.54 MW
901082 W1-029 E Adder 13.54 MW 11.51 MW
917122 Z2-027 E Adder 0.58 MW 0.49 MW
925522 AC1-027 E Adder 0.54 MW 0.46 MW
941501 AE2-147 C Adder 6.73 MW 5.72 MW
941502 AE2-147 E Adder 4.49 MW 3.81 MW
957832 AF2-077 E Adder 0.75 MW 0.64 MW
957871 AF2-081 C Adder 4.4 MW 3.74 MW
957872 AF2-081 E Adder 1.89 MW 1.6 MW
958161 AF2-110 C Adder 0.56 MW 0.47 MW
958162 AF2-110 E Adder 0.89 MW 0.75 MW
933291 AC2-141 C Adder 14.97 MW 12.73 MW
933292 AC2-141 E Adder 6.39 MW 5.43 MW
939411 AE1-173 C Adder 29.67 MW 25.22 MW
939412 AE1-173 E Adder 19.78 MW 16.81 MW
933981 AD1-022 C Adder 3.11 MW 2.64 MW
933982 AD1-022 E Adder 1.69 MW 1.44 MW
961681 AG1-008 C Adder 5.04 MW 4.29 MW
961682 AG1-008 E Adder 2.55 MW 2.17 MW
314594 6PLYMOUTH TP Adder 0.12 MW 0.1 MW
314632 6AYDLETT TAP Adder 0.59 MW 0.51 MW
917332 KELFORD E Adder 0.5 MW 0.42 MW
934065 AD1-033 E Adder 2.24 MW 1.9 MW
937226 AE2-253 E Adder 2.58 MW 2.19 MW
918512 AA1-065 E OP Adder 1.84 MW 1.56 MW
919153 AA1-139 E2 Adder 1.8 MW 1.53 MW
919152 AA1-139 E1 Adder 1.8 MW 1.53 MW
920692 AA2-178 E Adder 1.56 MW 1.33 MW
925122 AB2-169 E Adder 1.9 MW 1.61 MW
932046 AC2-012 E Adder 5.81 MW 4.94 MW
316311 AC2-079 C Adder 1.97 MW 1.68 MW
932596 AC2-079 E Adder 3.22 MW 2.73 MW
316349 AD2-085 C Adder 1.15 MW 0.98 MW
936666 AD2-085 E Adder 1.88 MW 1.6 MW
961611 AG1-000B C Adder 5.39 MW 4.58 MW
941591 AE2-156 C Adder 7.95 MW 6.76 MW
944581 AF1-123 C Adder 20.59 MW 17.5 MW
944582 AF1-123 E Adder 47.15 MW 40.08 MW
944591 AF1-124 C Adder 20.66 MW 17.56 MW
944592 AF1-124 E Adder 47.32 MW 40.22 MW
944601 AF1-125 C Adder 20.27 MW 17.23 MW
944602 AF1-125 E Adder 46.41 MW 39.45 MW
965691 AG1-437 C Adder 3.53 MW 3.0 MW
965692 AG1-437 E Adder 2.35 MW 2.0 MW
965701 AG1-438 C Adder 3.53 MW 3.0 MW
965702 AG1-438 E Adder 2.35 MW 2.0 MW
965741 AG1-442 C Adder 2.06 MW 1.75 MW
965751 AG1-443 C Adder 2.06 MW 1.75 MW
934501 AD1-074 C Adder 12.22 MW 10.38 MW
934502 AD1-074 E Adder 6.22 MW 5.29 MW
934511 AD1-075 C Adder 3.05 MW 2.6 MW
934512 AD1-075 E Adder 1.56 MW 1.32 MW
938531 AE1-072 C Adder 7.71 MW 6.55 MW
938532 AE1-072 E Adder 4.02 MW 3.42 MW
940641 AE2-051 C Adder 4.99 MW 4.24 MW
940642 AE2-051 E Adder 3.33 MW 2.83 MW
941101 AE2-104 C Adder 1.36 MW 1.16 MW
941102 AE2-104 E Adder 2.17 MW 1.84 MW
941281 AE2-122 C Adder 12.66 MW 10.76 MW
941282 AE2-122 E Adder 51.08 MW 43.42 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 5.5 MW 5.5 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 4.28 MW 4.28 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 20.13 MW 20.13 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.68 MW 0.68 MW
NY PJM->LTFIMP_NY CLTF 0.32 MW 0.32 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.22 MW 0.22 MW
WEC LTFEXP_WEC->PJM CLTF 0.12 MW 0.12 MW
CPLE LTFEXP_CPLE->PJM CLTF 2.5 MW 2.5 MW
TVA LTFEXP_TVA->PJM CLTF 1.18 MW 1.18 MW
MEC LTFEXP_MEC->PJM CLTF 0.72 MW 0.72 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.51 MW 1.51 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.04 MW 0.04 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 4.31 MW 4.31 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.19 MW 1.19 MW

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
Base Case OP AC 107.11 3220.44 A 3449.34 120.93
Elimination
Base Case Details for Eliminated Flowgate 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 4.36 MW 4.36 MW
963042 AG1-153 E 50/50 6.54 MW 6.54 MW
942931 AE2-313 C 50/50 28.25 MW 28.25 MW
942932 AE2-313 E 50/50 18.83 MW 18.83 MW
944011 AF1-069 C 50/50 10.23 MW 10.23 MW
944012 AF1-069 E 50/50 3.98 MW 3.98 MW
941031 AE2-094 C 50/50 31.32 MW 31.32 MW
941032 AE2-094 E 50/50 14.03 MW 14.03 MW
314331 6POE 50/50 1.1 MW 1.1 MW
314507 3THOMPSN Adder 1.62 MW 1.38 MW
314525 6KINGFORK Adder 0.81 MW 0.69 MW
314550 6HICKORY Adder 1.75 MW 1.49 MW
315065 1CHESTF6 Adder 15.59 MW 13.25 MW
315083 1SPRUNCA 50/50 7.36 MW 7.36 MW
315084 1SPRUNCB 50/50 7.36 MW 7.36 MW
926662 AC1-147 E Adder 1.07 MW 0.91 MW
926755 AC1-161 E 50/50 10.46 MW 10.46 MW
927226 AC1-216 E Adder 6.11 MW 5.19 MW
935112 AD1-144 E Adder 0.75 MW 0.64 MW
942162 AE2-228 E Adder 1.15 MW 0.97 MW
942341 AE2-247 C Adder 1.2 MW 1.02 MW
942342 AE2-247 E Adder 1.65 MW 1.4 MW
943461 AF1-017 C Adder 1.08 MW 0.92 MW
943462 AF1-017 E Adder 1.77 MW 1.5 MW
943612 AF1-032 E Adder 0.74 MW 0.63 MW
315102 1BRUNSWICKG1 50/50 5.97 MW 5.97 MW
315103 1BRUNSWICKG2 50/50 5.97 MW 5.97 MW
315104 1BRUNSWICKG3 50/50 5.97 MW 5.97 MW
315105 1BRUNSWICKS1 50/50 12.4 MW 12.4 MW
315108 1ELIZAR1 50/50 2.39 MW 2.39 MW
315110 1ELIZAR3 50/50 2.42 MW 2.42 MW
315225 1N ANNA1 50/50 44.22 MW 44.22 MW
315226 1N ANNA2 50/50 44.24 MW 44.24 MW
315241 1Z1-086 GT1 50/50 7.64 MW 7.64 MW
315242 1Z1-086 GT2 50/50 7.64 MW 7.64 MW
315243 1Z1-086 GT3 50/50 7.64 MW 7.64 MW
315244 1Z1-086 ST 50/50 13.3 MW 13.3 MW
315260 1GOSPORTA Adder 1.71 MW 1.46 MW
315261 1GOSPORTB Adder 2.19 MW 1.86 MW
315262 1GOSPORTC Adder 1.86 MW 1.58 MW
916192 Z1-068 E Adder 1.51 MW 1.28 MW
923852 AB2-025 E Adder 0.91 MW 0.77 MW
925022 AB2-158 E 50/50 4.88 MW 4.88 MW
938552 AE1-074 E 50/50 1.05 MW 1.05 MW
939312 AE1-162 E Adder 1.14 MW 0.97 MW
946262 AF1-291 E Adder 1.15 MW 0.97 MW
957492 AF2-043 E Adder 1.14 MW 0.97 MW
925522 AC1-027 E Adder 0.98 MW 0.83 MW
942001 AE2-212 C 50/50 1.73 MW 1.73 MW
942002 AE2-212 E 50/50 1.16 MW 1.16 MW
957871 AF2-081 C Adder 8.01 MW 6.81 MW
957872 AF2-081 E Adder 3.43 MW 2.92 MW
958161 AF2-110 C Adder 1.1 MW 0.93 MW
958162 AF2-110 E Adder 1.74 MW 1.48 MW
966331 AG1-502 C 50/50 9.23 MW 9.23 MW
966332 AG1-502 E 50/50 2.31 MW 2.31 MW
966341 AG1-503 C 50/50 2.31 MW 2.31 MW
966342 AG1-503 E 50/50 0.58 MW 0.58 MW
933291 AC2-141 C 50/50 24.51 MW 24.51 MW
933292 AC2-141 E 50/50 10.46 MW 10.46 MW
939411 AE1-173 C 50/50 72.9 MW 72.9 MW
939412 AE1-173 E 50/50 48.6 MW 48.6 MW
934011 AD1-025 C Adder 13.34 MW 11.34 MW
934012 AD1-025 E Adder 7.9 MW 6.72 MW
315085 1SPRUNCC 50/50 0.12 MW 0.12 MW
315086 1SPRUNCD 50/50 0.12 MW 0.12 MW
314632 6AYDLETT TAP Adder 1.09 MW 0.92 MW
316164 AC1-076_C 50/50 0.76 MW 0.76 MW
316192 AB2-158 C 50/50 1.71 MW 1.71 MW
316233 AE1-074 C 50/50 2.08 MW 2.08 MW
316240 AF1-291 C Adder 1.72 MW 1.46 MW
316294 AC1-161 C 50/50 3.71 MW 3.71 MW
316301 AE2-228 C Adder 1.72 MW 1.46 MW
934065 AD1-033 E Adder 4.03 MW 3.42 MW
937226 AE2-253 E Adder 4.68 MW 3.98 MW
963221 AG1-171 C Adder 1.7 MW 1.45 MW
963222 AG1-171 E Adder 1.13 MW 0.96 MW
963231 AG1-172 C Adder 1.7 MW 1.45 MW
963232 AG1-172 E Adder 1.13 MW 0.96 MW
963241 AG1-173 C Adder 1.7 MW 1.45 MW
963242 AG1-173 E Adder 1.13 MW 0.96 MW
926004 AC1-076_E 50/50 4.68 MW 4.68 MW
919153 AA1-139 E2 Adder 3.27 MW 2.78 MW
919152 AA1-139 E1 Adder 3.27 MW 2.78 MW
924814 AB2-134 E Adder 10.0 MW 8.5 MW
316084 AB2-161 E Adder 4.44 MW 3.78 MW
316044 AC1-158 C1 50/50 13.73 MW 13.73 MW
316045 AC1-158 C2 50/50 13.73 MW 13.73 MW
926739 AC1-158 E1 50/50 38.52 MW 38.52 MW
926740 AC1-158 E2 50/50 38.52 MW 38.52 MW
932046 AC2-012 E Adder 10.55 MW 8.96 MW
316311 AC2-079 C Adder 4.6 MW 3.91 MW
932596 AC2-079 E Adder 7.5 MW 6.38 MW
934576 AD1-082 E Adder 3.54 MW 3.01 MW
316349 AD2-085 C Adder 2.76 MW 2.35 MW
936666 AD2-085 E Adder 4.5 MW 3.83 MW
961611 AG1-000B C Adder 12.63 MW 10.73 MW
941591 AE2-156 C Adder 14.41 MW 12.25 MW
942371 AE2-250 C Adder 7.74 MW 6.58 MW
942372 AE2-250 E Adder 4.08 MW 3.47 MW
944581 AF1-123 C 50/50 36.62 MW 36.62 MW
944582 AF1-123 E 50/50 83.87 MW 83.87 MW
944591 AF1-124 C 50/50 36.76 MW 36.76 MW
944592 AF1-124 E 50/50 84.17 MW 84.17 MW
944601 AF1-125 C 50/50 36.06 MW 36.06 MW
944602 AF1-125 E 50/50 82.55 MW 82.55 MW
957431 AF2-037 C 50/50 12.42 MW 12.42 MW
957432 AF2-037 E 50/50 8.28 MW 8.28 MW
957691 AF2-063 C 50/50 19.81 MW 19.81 MW
957692 AF2-063 E 50/50 13.21 MW 13.21 MW
962271 AG1-075 C Adder 13.35 MW 11.35 MW
962272 AG1-075 E Adder 8.14 MW 6.92 MW
964421 AG1-305 C 50/50 8.32 MW 8.32 MW
964422 AG1-305 E 50/50 5.55 MW 5.55 MW
965281 AG1-393 C Adder 1.72 MW 1.46 MW
965282 AG1-393 E Adder 1.15 MW 0.97 MW
965811 AG1-449 C 50/50 18.29 MW 18.29 MW
935161 AD1-151 C Adder 12.74 MW 10.83 MW
935162 AD1-151 E Adder 3.31 MW 2.81 MW
938531 AE1-072 C Adder 14.07 MW 11.96 MW
938532 AE1-072 E Adder 7.33 MW 6.23 MW
939191 AE1-149 C Adder 8.64 MW 7.35 MW
939192 AE1-149 E Adder 5.76 MW 4.9 MW
940431 AE2-027 C Adder 10.29 MW 8.74 MW
940432 AE2-027 E Adder 6.86 MW 5.83 MW
940481 AE2-033 C Adder 12.65 MW 10.76 MW
940482 AE2-033 E Adder 8.53 MW 7.25 MW
940541 AE2-040 C Adder 2.25 MW 1.91 MW
940641 AE2-051 C 50/50 13.91 MW 13.91 MW
940642 AE2-051 E 50/50 9.27 MW 9.27 MW
941101 AE2-104 C Adder 2.68 MW 2.28 MW
941102 AE2-104 E Adder 4.27 MW 3.63 MW
941281 AE2-122 C Adder 22.88 MW 19.44 MW
941282 AE2-122 E Adder 92.3 MW 78.46 MW
944641 AF1-129 C Adder 81.3 MW 69.1 MW
316303 AF2-085 50/50 3.29 MW 3.29 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 18.13 MW 18.13 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 15.51 MW 15.51 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 69.23 MW 69.23 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.3 MW 4.3 MW
NY PJM->LTFIMP_NY CLTF 2.06 MW 2.06 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.82 MW 0.82 MW
WEC LTFEXP_WEC->PJM CLTF 0.39 MW 0.39 MW
CPLE LTFEXP_CPLE->PJM CLTF 8.21 MW 8.21 MW
TVA LTFEXP_TVA->PJM CLTF 4.37 MW 4.37 MW
MEC LTFEXP_MEC->PJM CLTF 2.56 MW 2.56 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.47 MW 5.47 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.16 MW 0.16 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 27.43 MW 27.43 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 3.91 MW 3.91 MW

Details for 8SEPTA-8SURRY 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8SEPTA-8SURRY 500.0 kV Ckt 1 line
314923 to 314924 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 120.61 2442.12 B 2945.47 156.64
Elimination
Base Case Details for Eliminated Flowgate 8SEPTA-8SURRY 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 6.64 MW 6.64 MW
963042 AG1-153 E 50/50 9.96 MW 9.96 MW
964791 AG1-342 C Adder 2.95 MW 2.5 MW
964792 AG1-342 E Adder 1.96 MW 1.67 MW
966811 AG1-552 C Adder 1.58 MW 1.34 MW
966812 AG1-552 E Adder 0.75 MW 0.64 MW
965591 AG1-427 C Adder 8.94 MW 7.6 MW
965592 AG1-427 E Adder 5.96 MW 5.06 MW
966621 AG1-532 C Adder 1.11 MW 0.95 MW
966622 AG1-532 E Adder 0.74 MW 0.63 MW
314572 3EMPORIA Adder 0.34 MW 0.29 MW
315131 1EDGECMA Adder 12.46 MW 10.59 MW
315153 1CLOVER1 50/50 12.08 MW 12.08 MW
315154 1CLOVER2 50/50 11.97 MW 11.97 MW
918492 AA1-063AE OP Adder 3.0 MW 2.55 MW
919692 AA2-053 E OP Adder 3.21 MW 2.73 MW
925785 AC1-054 E Adder 2.75 MW 2.34 MW
926274 AC1-105 E Adder 2.29 MW 1.95 MW
927146 AC1-208 E Adder 3.1 MW 2.64 MW
942931 AE2-313 C 50/50 43.31 MW 43.31 MW
942932 AE2-313 E 50/50 28.88 MW 28.88 MW
943902 AF1-058 E Adder 1.13 MW 0.96 MW
944011 AF1-069 C 50/50 15.81 MW 15.81 MW
944012 AF1-069 E 50/50 6.14 MW 6.14 MW
960061 AF2-297 C Adder 6.76 MW 5.75 MW
960062 AF2-297 E Adder 4.51 MW 3.83 MW
960081 AF2-299 C Adder 1.61 MW 1.37 MW
960082 AF2-299 E Adder 1.07 MW 0.91 MW
917342 Z2-044 E Adder 0.47 MW 0.4 MW
922923 AB1-081 E OP Adder 2.99 MW 2.54 MW
923263 AB1-132 E OP Adder 4.77 MW 4.06 MW
923573 AB1-173 E OP Adder 2.57 MW 2.19 MW
924162 AB2-060 E OP Adder 3.3 MW 2.81 MW
924302 AB2-077 E O1 Adder 1.05 MW 0.89 MW
924312 AB2-078 E O1 Adder 1.05 MW 0.89 MW
924322 AB2-079 E O1 Adder 1.05 MW 0.89 MW
939181 AE1-148 C Adder 7.36 MW 6.26 MW
939182 AE1-148 E Adder 4.91 MW 4.17 MW
940492 AE2-034 E Adder 2.23 MW 1.9 MW
941031 AE2-094 C 50/50 48.39 MW 48.39 MW
941032 AE2-094 E 50/50 21.67 MW 21.67 MW
946281 AF1-292 C Adder 1.23 MW 1.04 MW
946282 AF1-292 E Adder 0.82 MW 0.7 MW
957481 AF2-042 C 50/50 57.75 MW 57.75 MW
957482 AF2-042 E 50/50 38.5 MW 38.5 MW
916042 Z1-036 E Adder 20.8 MW 17.68 MW
314507 3THOMPSN Adder 1.8 MW 1.53 MW
314550 6HICKORY 50/50 2.01 MW 2.01 MW
926662 AC1-147 E Adder 1.19 MW 1.01 MW
926755 AC1-161 E 50/50 37.12 MW 37.12 MW
315102 1BRUNSWICKG1 50/50 9.08 MW 9.08 MW
315103 1BRUNSWICKG2 50/50 9.08 MW 9.08 MW
315104 1BRUNSWICKG3 50/50 9.08 MW 9.08 MW
315105 1BRUNSWICKS1 50/50 18.87 MW 18.87 MW
315108 1ELIZAR1 50/50 2.73 MW 2.73 MW
315109 1ELIZAR2 50/50 2.68 MW 2.68 MW
315110 1ELIZAR3 50/50 2.76 MW 2.76 MW
315241 1Z1-086 GT1 50/50 11.68 MW 11.68 MW
315242 1Z1-086 GT2 50/50 11.68 MW 11.68 MW
315243 1Z1-086 GT3 50/50 11.68 MW 11.68 MW
315244 1Z1-086 ST 50/50 20.34 MW 20.34 MW
315260 1GOSPORTA Adder 1.9 MW 1.62 MW
315261 1GOSPORTB Adder 2.43 MW 2.07 MW
315262 1GOSPORTC Adder 2.06 MW 1.75 MW
913392 Y1-086 E Adder 1.78 MW 1.51 MW
916192 Z1-068 E 50/50 1.7 MW 1.7 MW
923832 AB2-022 E Adder 1.0 MW 0.85 MW
923852 AB2-025 E Adder 0.97 MW 0.83 MW
901082 W1-029 E Adder 3.84 MW 3.26 MW
917122 Z2-027 E Adder 1.05 MW 0.89 MW
925522 AC1-027 E 50/50 1.1 MW 1.1 MW
957871 AF2-081 C Adder 8.85 MW 7.52 MW
957872 AF2-081 E Adder 3.79 MW 3.22 MW
926071 AC1-086 C Adder 16.39 MW 13.94 MW
926072 AC1-086 E Adder 7.46 MW 6.34 MW
933291 AC2-141 C 50/50 86.97 MW 86.97 MW
933292 AC2-141 E 50/50 37.12 MW 37.12 MW
934621 AD1-088 C Adder 9.18 MW 7.8 MW
934622 AD1-088 E Adder 4.32 MW 3.67 MW
939411 AE1-173 C 50/50 87.17 MW 87.17 MW
939412 AE1-173 E 50/50 58.11 MW 58.11 MW
916191 Z1-068 C 50/50 0.04 MW 0.04 MW
960331 AF2-324 C Adder 5.61 MW 4.77 MW
960332 AF2-324 E Adder 3.74 MW 3.18 MW
962572 AG1-106 E Adder 1.06 MW 0.9 MW
962571 AG1-106 C Adder 2.32 MW 1.97 MW
314632 6AYDLETT TAP Adder 1.17 MW 1.0 MW
316185 AD1-033 C 50/50 1.06 MW 1.06 MW
316210 AC1-098 C Adder 4.69 MW 3.98 MW
316212 AC1-099 C Adder 1.57 MW 1.33 MW
316263 AC1-034 C Adder 5.33 MW 4.53 MW
316274 AC1-208 C Adder 6.98 MW 5.94 MW
316294 AC1-161 C 50/50 13.17 MW 13.17 MW
316316 AC1-027 C 50/50 0.26 MW 0.26 MW
924516 AB2-100 E1 Adder 2.33 MW 1.98 MW
924517 AB2-100 E2 Adder 2.33 MW 1.98 MW
925595 AC1-034 E Adder 4.02 MW 3.42 MW
926206 AC1-098 E Adder 2.79 MW 2.37 MW
926214 AC1-099 E Adder 0.92 MW 0.78 MW
927255 AC1-221 E Adder 3.32 MW 2.82 MW
927264 AC1-222 E Adder 3.44 MW 2.93 MW
932763 AC2-100 E Adder 2.25 MW 1.91 MW
934065 AD1-033 E 50/50 4.66 MW 4.66 MW
937226 AE2-253 E Adder 5.25 MW 4.46 MW
919153 AA1-139 E2 Adder 3.62 MW 3.08 MW
919152 AA1-139 E1 Adder 3.62 MW 3.08 MW
919710 AA2-057 E Adder 3.12 MW 2.65 MW
920692 AA2-178 E Adder 2.97 MW 2.53 MW
923994 AB2-040_E Adder 4.82 MW 4.1 MW
924022 AB2-043 E O1 Adder 4.03 MW 3.43 MW
924152 AB2-059 E OP Adder 4.24 MW 3.6 MW
316088 AB2-174 E Adder 5.13 MW 4.36 MW
316375 AC2-012 C 50/50 1.13 MW 1.13 MW
932046 AC2-012 E 50/50 11.77 MW 11.77 MW
941591 AE2-156 C 50/50 16.24 MW 16.24 MW
944581 AF1-123 C 50/50 47.44 MW 47.44 MW
944582 AF1-123 E 50/50 108.64 MW 108.64 MW
944591 AF1-124 C 50/50 47.61 MW 47.61 MW
944592 AF1-124 E 50/50 109.03 MW 109.03 MW
944601 AF1-125 C 50/50 46.71 MW 46.71 MW
944602 AF1-125 E 50/50 106.93 MW 106.93 MW
962491 AG1-098 C Adder 8.31 MW 7.07 MW
962492 AG1-098 E Adder 5.54 MW 4.71 MW
962561 AG1-105 C Adder 7.31 MW 6.21 MW
962562 AG1-105 E Adder 4.87 MW 4.14 MW
964241 AG1-285 C Adder 9.35 MW 7.95 MW
964242 AG1-285 E Adder 6.24 MW 5.3 MW
965601 AG1-428 C Adder 3.78 MW 3.21 MW
965602 AG1-428 E Adder 2.52 MW 2.14 MW
965811 AG1-449 C 50/50 28.05 MW 28.05 MW
313764 3SOCKMAN Adder 0.55 MW 0.47 MW
932631 AC2-084 C Adder 5.01 MW 4.26 MW
932632 AC2-084 E Adder 2.47 MW 2.1 MW
934321 AD1-056 C Adder 4.97 MW 4.22 MW
934322 AD1-056 E Adder 2.7 MW 2.29 MW
934331 AD1-057 C Adder 2.77 MW 2.36 MW
934332 AD1-057 E Adder 1.44 MW 1.23 MW
934611 AD1-087 C 50/50 1.19 MW 1.19 MW
934612 AD1-087 E 50/50 3.7 MW 3.7 MW
935171 AD1-152 C 50/50 1.21 MW 1.21 MW
935172 AD1-152 E 50/50 5.38 MW 5.38 MW
937481 AD2-202 C 50/50 0.34 MW 0.34 MW
937482 AD2-202 E 50/50 1.08 MW 1.08 MW
938531 AE1-072 C Adder 15.3 MW 13.01 MW
938532 AE1-072 E Adder 7.98 MW 6.78 MW
940481 AE2-033 C Adder 13.48 MW 11.46 MW
940482 AE2-033 E Adder 9.09 MW 7.72 MW
940541 AE2-040 C Adder 2.4 MW 2.04 MW
940641 AE2-051 C 50/50 26.56 MW 26.56 MW
940642 AE2-051 E 50/50 17.71 MW 17.71 MW
941281 AE2-122 C 50/50 25.78 MW 25.78 MW
941282 AE2-122 E 50/50 104.04 MW 104.04 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 32.54 MW 32.54 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 21.46 MW 21.46 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 87.14 MW 87.14 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.49 MW 2.49 MW
NY PJM->LTFIMP_NY CLTF 1.14 MW 1.14 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.26 MW 1.26 MW
WEC LTFEXP_WEC->PJM CLTF 0.67 MW 0.67 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.37 MW 10.37 MW
TVA LTFEXP_TVA->PJM CLTF 5.69 MW 5.69 MW
MEC LTFEXP_MEC->PJM CLTF 3.91 MW 3.91 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.22 MW 7.22 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.24 MW 0.24 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 15.85 MW 15.85 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.95 MW 4.95 MW

Details for 6LIGH209-6LANEXA 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6LIGH209-6LANEXA 230.0 kV Ckt 1 line
314391 to 314388 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 130.6 663.64 B 866.7 78.55
Elimination
Base Case Details for Eliminated Flowgate 6LIGH209-6LANEXA 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.19 MW 0.16 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.75 MW 0.64 MW
962332 AG1-082 E Adder 0.5 MW 0.43 MW
962341 AG1-083 C Adder 0.75 MW 0.64 MW
962342 AG1-083 E Adder 0.5 MW 0.43 MW
963041 AG1-153 C Adder 1.56 MW 1.32 MW
963042 AG1-153 E Adder 2.34 MW 1.99 MW
964801 AG1-343 C Adder 2.24 MW 1.9 MW
964802 AG1-343 E Adder 1.76 MW 1.49 MW
966801 AG1-551 C Adder 0.75 MW 0.64 MW
966802 AG1-551 E Adder 0.4 MW 0.34 MW
966811 AG1-552 C Adder 0.62 MW 0.53 MW
966812 AG1-552 E Adder 0.3 MW 0.25 MW
965291 AG1-394 C Adder 0.32 MW 0.27 MW
965292 AG1-394 E Adder 0.59 MW 0.5 MW
314541 3WATKINS Adder 0.28 MW 0.24 MW
918492 AA1-063AE OP Adder 1.35 MW 1.15 MW
918532 AA1-067 E Adder 0.25 MW 0.21 MW
919692 AA2-053 E OP Adder 1.33 MW 1.13 MW
920042 AA2-088 E OP Adder 4.02 MW 3.42 MW
927146 AC1-208 E Adder 1.24 MW 1.05 MW
934521 AD1-076 C Adder 5.16 MW 4.38 MW
934522 AD1-076 E Adder 2.63 MW 2.23 MW
942931 AE2-313 C Adder 10.07 MW 8.56 MW
942932 AE2-313 E Adder 6.71 MW 5.71 MW
943172 AE2-346 E Adder 0.23 MW 0.19 MW
944011 AF1-069 C Adder 3.67 MW 3.12 MW
944012 AF1-069 E Adder 1.42 MW 1.21 MW
316141 AB2-099 E Adder 0.09 MW 0.08 MW
900672 V4-068 E Adder 0.13 MW 0.11 MW
940492 AE2-034 E Adder 1.36 MW 1.16 MW
941031 AE2-094 C Adder 11.22 MW 9.54 MW
941032 AE2-094 E Adder 5.03 MW 4.27 MW
957521 AF2-046 C Adder 5.89 MW 5.01 MW
957522 AF2-046 E Adder 2.98 MW 2.53 MW
957861 AF2-080 C Adder 2.5 MW 2.12 MW
957862 AF2-080 E Adder 1.11 MW 0.94 MW
314539 3UNCAMP Adder 2.57 MW 2.18 MW
916042 Z1-036 E Adder 13.59 MW 11.55 MW
938771 AE1-103 C Adder 1.26 MW 1.07 MW
938772 AE1-103 E Adder 1.74 MW 1.48 MW
314421 6WINCHST 50/50 0.11 MW 0.11 MW
314507 3THOMPSN Adder 1.04 MW 0.88 MW
314525 6KINGFORK Adder 0.55 MW 0.47 MW
314550 6HICKORY Adder 1.12 MW 0.95 MW
315092 1YORKTN3 50/50 139.21 MW 139.21 MW
926662 AC1-147 E Adder 0.68 MW 0.58 MW
926755 AC1-161 E 50/50 7.36 MW 7.36 MW
935112 AD1-144 E Adder 0.51 MW 0.44 MW
942341 AE2-247 C Adder 0.58 MW 0.5 MW
942342 AE2-247 E Adder 0.81 MW 0.69 MW
943461 AF1-017 C Adder 0.53 MW 0.45 MW
943462 AF1-017 E Adder 0.86 MW 0.73 MW
943612 AF1-032 E Adder 0.47 MW 0.4 MW
944871 AF1-152 C Adder 2.6 MW 2.21 MW
944872 AF1-152 E Adder 1.73 MW 1.47 MW
315233 1SURRY 2 50/50 15.21 MW 15.21 MW
315260 1GOSPORTA Adder 1.09 MW 0.93 MW
315261 1GOSPORTB Adder 1.4 MW 1.19 MW
315262 1GOSPORTC Adder 1.18 MW 1.01 MW
913392 Y1-086 E Adder 1.1 MW 0.93 MW
916192 Z1-068 E Adder 0.97 MW 0.82 MW
923832 AB2-022 E Adder 0.62 MW 0.53 MW
939312 AE1-162 E Adder 0.68 MW 0.58 MW
957492 AF2-043 E Adder 0.73 MW 0.62 MW
957601 AF2-054 C Adder -1.41 MW -1.2 MW
962962 AG1-145 E 50/50 0.91 MW 0.91 MW
964211 AG1-282 C Adder -2.23 MW -1.9 MW
901082 W1-029 E Adder 15.66 MW 13.31 MW
917122 Z2-027 E Adder 0.67 MW 0.57 MW
925522 AC1-027 E Adder 0.63 MW 0.53 MW
941501 AE2-147 C Adder 7.79 MW 6.62 MW
941502 AE2-147 E Adder 5.19 MW 4.41 MW
957871 AF2-081 C Adder 5.09 MW 4.33 MW
957872 AF2-081 E Adder 2.18 MW 1.85 MW
958161 AF2-110 C Adder 0.65 MW 0.55 MW
958162 AF2-110 E Adder 1.03 MW 0.87 MW
917512 Z2-088 E OP1 Adder 1.56 MW 1.33 MW
927021 AC1-189 C Adder 2.75 MW 2.34 MW
927022 AC1-189 E Adder 1.37 MW 1.17 MW
933291 AC2-141 C 50/50 17.25 MW 17.25 MW
933292 AC2-141 E 50/50 7.36 MW 7.36 MW
939411 AE1-173 C Adder 34.54 MW 29.36 MW
939412 AE1-173 E Adder 23.03 MW 19.57 MW
933981 AD1-022 C Adder 3.62 MW 3.07 MW
933982 AD1-022 E Adder 1.97 MW 1.67 MW
961681 AG1-008 C Adder 5.89 MW 5.01 MW
961682 AG1-008 E Adder 2.98 MW 2.53 MW
314594 6PLYMOUTH TP Adder 0.14 MW 0.12 MW
314632 6AYDLETT TAP Adder 0.69 MW 0.58 MW
316159 AE1-175 C 50/50 0.23 MW 0.23 MW
316160 AE1-175 E 50/50 0.75 MW 0.75 MW
316210 AC1-098 C Adder 1.97 MW 1.68 MW
316212 AC1-099 C Adder 0.66 MW 0.56 MW
316274 AC1-208 C Adder 2.8 MW 2.38 MW
316294 AC1-161 C 50/50 2.61 MW 2.61 MW
316382 AG1-145 C 50/50 0.21 MW 0.21 MW
917332 KELFORD E Adder 0.58 MW 0.5 MW
926206 AC1-098 E Adder 1.18 MW 1.0 MW
926214 AC1-099 E Adder 0.39 MW 0.33 MW
934065 AD1-033 E Adder 2.59 MW 2.2 MW
937226 AE2-253 E Adder 2.99 MW 2.54 MW
918512 AA1-065 E OP Adder 2.14 MW 1.82 MW
919153 AA1-139 E2 Adder 2.08 MW 1.77 MW
919152 AA1-139 E1 Adder 2.08 MW 1.77 MW
920692 AA2-178 E Adder 1.81 MW 1.54 MW
925122 AB2-169 E Adder 2.21 MW 1.88 MW
932046 AC2-012 E Adder 6.72 MW 5.72 MW
316311 AC2-079 C Adder 2.3 MW 1.96 MW
932596 AC2-079 E Adder 3.76 MW 3.2 MW
316349 AD2-085 C Adder 1.35 MW 1.15 MW
936666 AD2-085 E Adder 2.2 MW 1.87 MW
961611 AG1-000B C Adder 6.39 MW 5.43 MW
941591 AE2-156 C Adder 9.2 MW 7.82 MW
944581 AF1-123 C Adder 23.79 MW 20.22 MW
944582 AF1-123 E Adder 54.48 MW 46.3 MW
944591 AF1-124 C Adder 23.87 MW 20.29 MW
944592 AF1-124 E Adder 54.67 MW 46.47 MW
944601 AF1-125 C Adder 23.42 MW 19.91 MW
944602 AF1-125 E Adder 53.62 MW 45.58 MW
965691 AG1-437 C Adder 4.11 MW 3.49 MW
965692 AG1-437 E Adder 2.74 MW 2.33 MW
965701 AG1-438 C Adder 4.11 MW 3.49 MW
965702 AG1-438 E Adder 2.74 MW 2.33 MW
965711 AG1-439 C Adder 7.5 MW 6.38 MW
965712 AG1-439 E Adder 5.0 MW 4.25 MW
965741 AG1-442 C Adder 2.4 MW 2.04 MW
965751 AG1-443 C Adder 2.4 MW 2.04 MW
965761 AG1-444 C Adder 4.0 MW 3.4 MW
965811 AG1-449 C Adder 6.52 MW 5.54 MW
932631 AC2-084 C Adder 2.11 MW 1.79 MW
932632 AC2-084 E Adder 1.04 MW 0.88 MW
934501 AD1-074 C Adder 14.2 MW 12.07 MW
934502 AD1-074 E Adder 7.23 MW 6.15 MW
934511 AD1-075 C Adder 3.55 MW 3.02 MW
934512 AD1-075 E Adder 1.81 MW 1.54 MW
938531 AE1-072 C Adder 8.92 MW 7.58 MW
938532 AE1-072 E Adder 4.65 MW 3.95 MW
940641 AE2-051 C Adder 5.83 MW 4.96 MW
940642 AE2-051 E Adder 3.89 MW 3.31 MW
941101 AE2-104 C Adder 1.58 MW 1.34 MW
941102 AE2-104 E Adder 2.52 MW 2.14 MW
941281 AE2-122 C Adder 14.64 MW 12.45 MW
941282 AE2-122 E Adder 59.09 MW 50.22 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 7.35 MW 7.35 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 5.41 MW 5.41 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 24.2 MW 24.2 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.85 MW 0.85 MW
NY PJM->LTFIMP_NY CLTF 0.4 MW 0.4 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.29 MW 0.29 MW
WEC LTFEXP_WEC->PJM CLTF 0.15 MW 0.15 MW
CPLE LTFEXP_CPLE->PJM CLTF 2.98 MW 2.98 MW
TVA LTFEXP_TVA->PJM CLTF 1.47 MW 1.47 MW
MEC LTFEXP_MEC->PJM CLTF 0.94 MW 0.94 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.87 MW 1.87 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 5.39 MW 5.39 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.42 MW 1.42 MW

Details for 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 186.29 663.64 B 1236.32 49.88
Elimination
Base Case Details for Eliminated Flowgate 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.2 MW 0.17 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.78 MW 0.67 MW
962332 AG1-082 E Adder 0.52 MW 0.44 MW
962341 AG1-083 C Adder 0.78 MW 0.67 MW
962342 AG1-083 E Adder 0.52 MW 0.44 MW
963041 AG1-153 C Adder 2.04 MW 1.74 MW
963042 AG1-153 E Adder 3.07 MW 2.61 MW
964801 AG1-343 C Adder 2.36 MW 2.01 MW
964802 AG1-343 E Adder 1.85 MW 1.58 MW
966811 AG1-552 C Adder 0.83 MW 0.71 MW
966812 AG1-552 E Adder 0.4 MW 0.34 MW
965291 AG1-394 C Adder 0.34 MW 0.29 MW
965292 AG1-394 E Adder 0.62 MW 0.53 MW
966621 AG1-532 C Adder 0.63 MW 0.54 MW
966622 AG1-532 E Adder 0.42 MW 0.36 MW
314541 3WATKINS Adder 0.27 MW 0.23 MW
314572 3EMPORIA Adder 0.19 MW 0.16 MW
918492 AA1-063AE OP Adder 1.64 MW 1.39 MW
919692 AA2-053 E OP Adder 1.7 MW 1.44 MW
920042 AA2-088 E OP Adder 4.19 MW 3.56 MW
927146 AC1-208 E Adder 1.55 MW 1.32 MW
934521 AD1-076 C Adder 4.52 MW 3.84 MW
934522 AD1-076 E Adder 2.3 MW 1.96 MW
942931 AE2-313 C Adder 13.26 MW 11.27 MW
942932 AE2-313 E Adder 8.84 MW 7.51 MW
943172 AE2-346 E Adder 0.24 MW 0.2 MW
944011 AF1-069 C Adder 4.84 MW 4.12 MW
944012 AF1-069 E Adder 1.88 MW 1.6 MW
960081 AF2-299 C Adder 0.91 MW 0.78 MW
960082 AF2-299 E Adder 0.61 MW 0.52 MW
316141 AB2-099 E Adder 0.1 MW 0.08 MW
900672 V4-068 E Adder 0.14 MW 0.12 MW
923263 AB1-132 E OP Adder 2.7 MW 2.3 MW
923573 AB1-173 E OP Adder 1.41 MW 1.2 MW
940492 AE2-034 E Adder 1.12 MW 0.96 MW
941031 AE2-094 C Adder 14.82 MW 12.59 MW
941032 AE2-094 E Adder 6.64 MW 5.64 MW
946281 AF1-292 C Adder 0.7 MW 0.59 MW
946282 AF1-292 E Adder 0.47 MW 0.4 MW
957521 AF2-046 C Adder 6.18 MW 5.25 MW
957522 AF2-046 E Adder 3.12 MW 2.65 MW
314539 3UNCAMP Adder 2.39 MW 2.03 MW
916042 Z1-036 E Adder 10.23 MW 8.7 MW
938771 AE1-103 C Adder 1.15 MW 0.97 MW
938772 AE1-103 E Adder 1.58 MW 1.35 MW
314331 6POE 50/50 1.19 MW 1.19 MW
314507 3THOMPSN Adder 0.7 MW 0.6 MW
314525 6KINGFORK Adder 0.36 MW 0.31 MW
314550 6HICKORY Adder 0.74 MW 0.63 MW
315065 1CHESTF6 50/50 26.23 MW 26.23 MW
315073 1STONECA 50/50 4.77 MW 4.77 MW
315076 1HOPPOLC 50/50 0.98 MW 0.98 MW
315077 1HOPHCF1 50/50 1.56 MW 1.56 MW
315078 1HOPHCF2 50/50 1.56 MW 1.56 MW
315079 1HOPHCF3 50/50 1.56 MW 1.56 MW
315080 1HOPHCF4 50/50 2.37 MW 2.37 MW
926662 AC1-147 E Adder 0.46 MW 0.39 MW
927226 AC1-216 E Adder 4.3 MW 3.65 MW
935112 AD1-144 E Adder 0.34 MW 0.28 MW
942162 AE2-228 E 50/50 1.81 MW 1.81 MW
942341 AE2-247 C Adder 0.71 MW 0.6 MW
942342 AE2-247 E Adder 0.98 MW 0.83 MW
943461 AF1-017 C Adder 0.64 MW 0.55 MW
943462 AF1-017 E Adder 1.05 MW 0.89 MW
943612 AF1-032 E Adder 0.33 MW 0.28 MW
944871 AF1-152 C Adder 1.86 MW 1.58 MW
944872 AF1-152 E Adder 1.24 MW 1.06 MW
315260 1GOSPORTA Adder 0.74 MW 0.63 MW
315261 1GOSPORTB Adder 0.95 MW 0.81 MW
315262 1GOSPORTC Adder 0.81 MW 0.69 MW
316132 AB2-190 C 50/50 2.4 MW 2.4 MW
913392 Y1-086 E Adder 0.76 MW 0.65 MW
916192 Z1-068 E Adder 0.65 MW 0.55 MW
923832 AB2-022 E Adder 0.43 MW 0.37 MW
923852 AB2-025 E 50/50 0.68 MW 0.68 MW
939312 AE1-162 E Adder 0.58 MW 0.5 MW
946262 AF1-291 E 50/50 1.85 MW 1.85 MW
957492 AF2-043 E Adder 0.5 MW 0.43 MW
901082 W1-029 E Adder 11.25 MW 9.56 MW
917122 Z2-027 E Adder 0.47 MW 0.4 MW
925332 AB2-190 E 50/50 4.92 MW 4.92 MW
925522 AC1-027 E Adder 0.42 MW 0.36 MW
941501 AE2-147 C Adder 5.6 MW 4.76 MW
941502 AE2-147 E Adder 3.73 MW 3.17 MW
942001 AE2-212 C 50/50 2.35 MW 2.35 MW
942002 AE2-212 E 50/50 1.56 MW 1.56 MW
957871 AF2-081 C Adder 3.43 MW 2.92 MW
957872 AF2-081 E Adder 1.47 MW 1.25 MW
958161 AF2-110 C Adder 0.53 MW 0.45 MW
958162 AF2-110 E Adder 0.84 MW 0.72 MW
926071 AC1-086 C Adder 9.28 MW 7.89 MW
926072 AC1-086 E Adder 4.23 MW 3.59 MW
939411 AE1-173 C Adder 32.67 MW 27.77 MW
939412 AE1-173 E Adder 21.78 MW 18.51 MW
934011 AD1-025 C Adder 9.39 MW 7.98 MW
934012 AD1-025 E Adder 5.56 MW 4.73 MW
933981 AD1-022 C Adder 3.26 MW 2.77 MW
933982 AD1-022 E Adder 1.78 MW 1.51 MW
962572 AG1-106 E Adder 0.6 MW 0.51 MW
961681 AG1-008 C Adder 6.18 MW 5.25 MW
961682 AG1-008 E Adder 3.12 MW 2.65 MW
962571 AG1-106 C Adder 1.31 MW 1.12 MW
314594 6PLYMOUTH TP Adder 0.12 MW 0.1 MW
314632 6AYDLETT TAP Adder 0.47 MW 0.4 MW
316210 AC1-098 C Adder 2.37 MW 2.01 MW
316212 AC1-099 C Adder 0.79 MW 0.67 MW
316240 AF1-291 C 50/50 2.78 MW 2.78 MW
316274 AC1-208 C Adder 3.5 MW 2.98 MW
316301 AE2-228 C 50/50 2.71 MW 2.71 MW
316315 AB2-025 C 50/50 0.22 MW 0.22 MW
917332 KELFORD E Adder 0.64 MW 0.54 MW
924516 AB2-100 E1 Adder 1.44 MW 1.23 MW
924517 AB2-100 E2 Adder 1.44 MW 1.23 MW
926206 AC1-098 E Adder 1.41 MW 1.2 MW
926214 AC1-099 E Adder 0.47 MW 0.4 MW
934065 AD1-033 E Adder 1.71 MW 1.46 MW
937226 AE2-253 E Adder 2.0 MW 1.7 MW
963221 AG1-171 C Adder 1.2 MW 1.02 MW
963222 AG1-171 E Adder 0.8 MW 0.68 MW
963231 AG1-172 C Adder 1.2 MW 1.02 MW
963232 AG1-172 E Adder 0.8 MW 0.68 MW
963241 AG1-173 C Adder 1.2 MW 1.02 MW
963242 AG1-173 E Adder 0.8 MW 0.68 MW
918512 AA1-065 E OP Adder 2.11 MW 1.8 MW
919153 AA1-139 E2 Adder 1.4 MW 1.19 MW
919152 AA1-139 E1 Adder 1.4 MW 1.19 MW
919710 AA2-057 E Adder 1.51 MW 1.28 MW
920692 AA2-178 E Adder 1.5 MW 1.27 MW
923994 AB2-040_E Adder 2.64 MW 2.25 MW
924814 AB2-134 E Adder 7.04 MW 5.98 MW
316083 AB2-161 C 50/50 0.31 MW 0.31 MW
316084 AB2-161 E 50/50 3.38 MW 3.38 MW
925122 AB2-169 E Adder 2.12 MW 1.8 MW
316088 AB2-174 E Adder 2.85 MW 2.42 MW
932046 AC2-012 E Adder 4.57 MW 3.88 MW
316311 AC2-079 C Adder 2.67 MW 2.27 MW
932596 AC2-079 E Adder 4.35 MW 3.7 MW
316381 AD1-082 C 50/50 0.71 MW 0.71 MW
934576 AD1-082 E 50/50 2.69 MW 2.69 MW
316349 AD2-085 C Adder 1.64 MW 1.39 MW
936666 AD2-085 E Adder 2.67 MW 2.27 MW
961611 AG1-000B C Adder 7.56 MW 6.42 MW
941591 AE2-156 C Adder 6.23 MW 5.3 MW
942371 AE2-250 C Adder 4.76 MW 4.04 MW
942372 AE2-250 E Adder 2.51 MW 2.13 MW
944581 AF1-123 C Adder 15.11 MW 12.84 MW
944582 AF1-123 E Adder 34.59 MW 29.41 MW
944591 AF1-124 C Adder 15.16 MW 12.89 MW
944592 AF1-124 E Adder 34.72 MW 29.51 MW
944601 AF1-125 C Adder 13.59 MW 11.55 MW
944602 AF1-125 E Adder 31.1 MW 26.44 MW
962271 AG1-075 C Adder 8.21 MW 6.98 MW
962272 AG1-075 E Adder 5.0 MW 4.25 MW
965281 AG1-393 C Adder 1.06 MW 0.9 MW
965282 AG1-393 E Adder 0.7 MW 0.6 MW
965601 AG1-428 C Adder 1.84 MW 1.56 MW
965602 AG1-428 E Adder 1.23 MW 1.04 MW
965691 AG1-437 C Adder 3.8 MW 3.23 MW
965692 AG1-437 E Adder 2.54 MW 2.15 MW
965701 AG1-438 C Adder 3.8 MW 3.23 MW
965702 AG1-438 E Adder 2.54 MW 2.15 MW
965741 AG1-442 C Adder 2.22 MW 1.89 MW
965751 AG1-443 C Adder 2.22 MW 1.89 MW
965811 AG1-449 C Adder 8.59 MW 7.3 MW
313764 3SOCKMAN Adder 0.3 MW 0.25 MW
932631 AC2-084 C Adder 2.53 MW 2.15 MW
932632 AC2-084 E Adder 1.25 MW 1.06 MW
934321 AD1-056 C Adder 2.52 MW 2.14 MW
934322 AD1-056 E Adder 1.36 MW 1.16 MW
934331 AD1-057 C Adder 1.4 MW 1.19 MW
934332 AD1-057 E Adder 0.73 MW 0.62 MW
934501 AD1-074 C Adder 12.44 MW 10.58 MW
934502 AD1-074 E Adder 6.34 MW 5.38 MW
934511 AD1-075 C Adder 3.11 MW 2.64 MW
934512 AD1-075 E Adder 1.58 MW 1.35 MW
935161 AD1-151 C 50/50 9.43 MW 9.43 MW
935162 AD1-151 E 50/50 6.29 MW 6.29 MW
938531 AE1-072 C Adder 6.05 MW 5.14 MW
938532 AE1-072 E Adder 3.15 MW 2.68 MW
939191 AE1-149 C 50/50 7.55 MW 7.55 MW
939192 AE1-149 E 50/50 5.04 MW 5.04 MW
940431 AE2-027 C Adder 5.35 MW 4.55 MW
940432 AE2-027 E Adder 3.56 MW 3.03 MW
940481 AE2-033 C 50/50 9.24 MW 9.24 MW
940482 AE2-033 E 50/50 6.23 MW 6.23 MW
940541 AE2-040 C 50/50 1.67 MW 1.67 MW
940641 AE2-051 C Adder 6.35 MW 5.4 MW
940642 AE2-051 E Adder 4.24 MW 3.6 MW
941101 AE2-104 C Adder 1.3 MW 1.11 MW
941102 AE2-104 E Adder 2.07 MW 1.76 MW
941281 AE2-122 C Adder 9.8 MW 8.33 MW
941282 AE2-122 E Adder 39.54 MW 33.61 MW
944641 AF1-129 C 50/50 136.78 MW 136.78 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 9.7 MW 9.7 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.98 MW 6.98 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 30.65 MW 30.65 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.04 MW 1.04 MW
NY PJM->LTFIMP_NY CLTF 0.48 MW 0.48 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.39 MW 0.39 MW
WEC LTFEXP_WEC->PJM CLTF 0.2 MW 0.2 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.74 MW 3.74 MW
TVA LTFEXP_TVA->PJM CLTF 1.89 MW 1.89 MW
MEC LTFEXP_MEC->PJM CLTF 1.22 MW 1.22 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.41 MW 2.41 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.62 MW 6.62 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.78 MW 1.78 MW

Details for 6VARINA-6CHARCTY 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6VARINA-6CHARCTY 230.0 kV Ckt 1 line
314260 to 314225 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 112.08 984.18 B 1103.08 46.31
Elimination
Base Case Details for Eliminated Flowgate 6VARINA-6CHARCTY 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.18 MW 0.15 MW
961942 AG1-037 E Adder 0.12 MW 0.1 MW
962331 AG1-082 C Adder 0.72 MW 0.62 MW
962332 AG1-082 E Adder 0.48 MW 0.41 MW
962341 AG1-083 C Adder 0.72 MW 0.62 MW
962342 AG1-083 E Adder 0.48 MW 0.41 MW
963041 AG1-153 C Adder 1.89 MW 1.61 MW
963042 AG1-153 E Adder 2.83 MW 2.41 MW
964801 AG1-343 C Adder 2.19 MW 1.86 MW
964802 AG1-343 E Adder 1.72 MW 1.46 MW
966811 AG1-552 C Adder 0.77 MW 0.66 MW
966812 AG1-552 E Adder 0.37 MW 0.31 MW
965291 AG1-394 C Adder 0.31 MW 0.27 MW
965292 AG1-394 E Adder 0.58 MW 0.49 MW
966621 AG1-532 C Adder 0.58 MW 0.5 MW
966622 AG1-532 E Adder 0.39 MW 0.33 MW
314541 3WATKINS Adder 0.25 MW 0.21 MW
314572 3EMPORIA Adder 0.18 MW 0.15 MW
918492 AA1-063AE OP Adder 1.52 MW 1.29 MW
919692 AA2-053 E OP Adder 1.58 MW 1.34 MW
920042 AA2-088 E OP Adder 3.89 MW 3.31 MW
925785 AC1-054 E Adder 1.14 MW 0.97 MW
927146 AC1-208 E Adder 1.44 MW 1.23 MW
934521 AD1-076 C Adder 4.19 MW 3.56 MW
934522 AD1-076 E Adder 2.13 MW 1.81 MW
942931 AE2-313 C Adder 12.24 MW 10.4 MW
942932 AE2-313 E Adder 8.16 MW 6.94 MW
943172 AE2-346 E Adder 0.22 MW 0.18 MW
944011 AF1-069 C Adder 4.46 MW 3.79 MW
944012 AF1-069 E Adder 1.73 MW 1.47 MW
960081 AF2-299 C Adder 0.84 MW 0.72 MW
960082 AF2-299 E Adder 0.56 MW 0.48 MW
316141 AB2-099 E Adder 0.09 MW 0.08 MW
900672 V4-068 E Adder 0.13 MW 0.11 MW
923263 AB1-132 E OP Adder 2.48 MW 2.11 MW
923573 AB1-173 E OP Adder 1.31 MW 1.11 MW
940492 AE2-034 E Adder 1.04 MW 0.89 MW
941031 AE2-094 C Adder 13.63 MW 11.59 MW
941032 AE2-094 E Adder 6.11 MW 5.19 MW
946281 AF1-292 C Adder 0.65 MW 0.55 MW
946282 AF1-292 E Adder 0.43 MW 0.37 MW
957481 AF2-042 C Adder 16.9 MW 14.36 MW
957482 AF2-042 E Adder 11.26 MW 9.57 MW
957521 AF2-046 C Adder 5.73 MW 4.87 MW
957522 AF2-046 E Adder 2.89 MW 2.46 MW
314539 3UNCAMP Adder 2.21 MW 1.88 MW
916042 Z1-036 E Adder 9.49 MW 8.07 MW
938771 AE1-103 C Adder 1.06 MW 0.9 MW
938772 AE1-103 E Adder 1.47 MW 1.25 MW
314331 6POE 50/50 1.05 MW 1.05 MW
314507 3THOMPSN Adder 0.65 MW 0.56 MW
314525 6KINGFORK Adder 0.34 MW 0.29 MW
314550 6HICKORY Adder 0.69 MW 0.59 MW
315065 1CHESTF6 50/50 22.43 MW 22.43 MW
315073 1STONECA 50/50 4.29 MW 4.29 MW
315076 1HOPPOLC 50/50 0.88 MW 0.88 MW
315077 1HOPHCF1 50/50 1.41 MW 1.41 MW
315078 1HOPHCF2 50/50 1.41 MW 1.41 MW
315079 1HOPHCF3 50/50 1.41 MW 1.41 MW
315080 1HOPHCF4 50/50 2.13 MW 2.13 MW
926662 AC1-147 E Adder 0.43 MW 0.36 MW
927226 AC1-216 E Adder 3.91 MW 3.32 MW
935112 AD1-144 E Adder 0.31 MW 0.27 MW
942162 AE2-228 E 50/50 1.56 MW 1.56 MW
942341 AE2-247 C Adder 0.65 MW 0.55 MW
942342 AE2-247 E Adder 0.9 MW 0.77 MW
943461 AF1-017 C Adder 0.59 MW 0.5 MW
943462 AF1-017 E Adder 0.96 MW 0.82 MW
943612 AF1-032 E Adder 0.3 MW 0.26 MW
944871 AF1-152 C Adder 1.73 MW 1.47 MW
944872 AF1-152 E Adder 1.15 MW 0.98 MW
315260 1GOSPORTA Adder 0.69 MW 0.59 MW
315261 1GOSPORTB Adder 0.88 MW 0.75 MW
315262 1GOSPORTC Adder 0.75 MW 0.64 MW
913392 Y1-086 E Adder 0.71 MW 0.6 MW
916192 Z1-068 E Adder 0.6 MW 0.51 MW
923832 AB2-022 E Adder 0.4 MW 0.34 MW
923852 AB2-025 E Adder 0.61 MW 0.52 MW
939312 AE1-162 E Adder 0.54 MW 0.46 MW
946262 AF1-291 E 50/50 1.59 MW 1.59 MW
957492 AF2-043 E Adder 0.47 MW 0.4 MW
901082 W1-029 E Adder 10.44 MW 8.88 MW
917122 Z2-027 E Adder 0.44 MW 0.37 MW
925332 AB2-190 E Adder 4.45 MW 3.79 MW
925522 AC1-027 E Adder 0.39 MW 0.33 MW
941501 AE2-147 C Adder 5.19 MW 4.41 MW
941502 AE2-147 E Adder 3.46 MW 2.94 MW
942001 AE2-212 C 50/50 2.05 MW 2.05 MW
942002 AE2-212 E 50/50 1.37 MW 1.37 MW
957871 AF2-081 C Adder 3.18 MW 2.71 MW
957872 AF2-081 E Adder 1.36 MW 1.16 MW
958161 AF2-110 C Adder 0.49 MW 0.42 MW
958162 AF2-110 E Adder 0.78 MW 0.66 MW
926071 AC1-086 C Adder 8.52 MW 7.25 MW
926072 AC1-086 E Adder 3.88 MW 3.3 MW
939411 AE1-173 C Adder 30.1 MW 25.59 MW
939412 AE1-173 E Adder 20.07 MW 17.06 MW
934011 AD1-025 C Adder 8.54 MW 7.26 MW
934012 AD1-025 E Adder 5.06 MW 4.3 MW
933981 AD1-022 C Adder 3.02 MW 2.57 MW
933982 AD1-022 E Adder 1.65 MW 1.4 MW
962572 AG1-106 E Adder 0.55 MW 0.47 MW
961681 AG1-008 C Adder 5.73 MW 4.87 MW
961682 AG1-008 E Adder 2.89 MW 2.46 MW
962571 AG1-106 C Adder 1.21 MW 1.02 MW
314594 6PLYMOUTH TP Adder 0.11 MW 0.09 MW
314632 6AYDLETT TAP Adder 0.43 MW 0.37 MW
316210 AC1-098 C Adder 2.2 MW 1.87 MW
316212 AC1-099 C Adder 0.74 MW 0.62 MW
316240 AF1-291 C 50/50 2.38 MW 2.38 MW
316274 AC1-208 C Adder 3.25 MW 2.76 MW
316301 AE2-228 C 50/50 2.33 MW 2.33 MW
917332 KELFORD E Adder 0.59 MW 0.5 MW
924516 AB2-100 E1 Adder 1.32 MW 1.12 MW
924517 AB2-100 E2 Adder 1.32 MW 1.12 MW
926206 AC1-098 E Adder 1.31 MW 1.11 MW
926214 AC1-099 E Adder 0.43 MW 0.37 MW
934065 AD1-033 E Adder 1.59 MW 1.35 MW
937226 AE2-253 E Adder 1.86 MW 1.58 MW
963221 AG1-171 C Adder 1.09 MW 0.93 MW
963222 AG1-171 E Adder 0.72 MW 0.62 MW
963231 AG1-172 C Adder 1.09 MW 0.93 MW
963232 AG1-172 E Adder 0.72 MW 0.62 MW
963241 AG1-173 C Adder 1.09 MW 0.93 MW
963242 AG1-173 E Adder 0.72 MW 0.62 MW
918512 AA1-065 E OP Adder 1.96 MW 1.66 MW
919153 AA1-139 E2 Adder 1.3 MW 1.11 MW
919152 AA1-139 E1 Adder 1.3 MW 1.11 MW
919710 AA2-057 E Adder 1.4 MW 1.19 MW
920692 AA2-178 E Adder 1.39 MW 1.18 MW
923994 AB2-040_E Adder 2.45 MW 2.08 MW
924814 AB2-134 E Adder 6.4 MW 5.44 MW
316084 AB2-161 E Adder 3.08 MW 2.62 MW
925122 AB2-169 E Adder 1.96 MW 1.67 MW
316088 AB2-174 E Adder 2.64 MW 2.24 MW
932046 AC2-012 E Adder 4.24 MW 3.6 MW
316311 AC2-079 C Adder 2.45 MW 2.08 MW
932596 AC2-079 E Adder 4.0 MW 3.4 MW
934576 AD1-082 E Adder 2.45 MW 2.08 MW
316349 AD2-085 C Adder 1.5 MW 1.28 MW
936666 AD2-085 E Adder 2.46 MW 2.09 MW
961611 AG1-000B C Adder 6.94 MW 5.89 MW
941591 AE2-156 C Adder 5.78 MW 4.91 MW
942371 AE2-250 C 50/50 5.41 MW 5.41 MW
942372 AE2-250 E 50/50 2.85 MW 2.85 MW
944582 AF1-123 E Adder 32.12 MW 27.3 MW
944591 AF1-124 C Adder 13.59 MW 11.55 MW
944592 AF1-124 E Adder 32.24 MW 27.4 MW
944602 AF1-125 E Adder 31.62 MW 26.87 MW
962271 AG1-075 C 50/50 9.34 MW 9.34 MW
962272 AG1-075 E 50/50 5.69 MW 5.69 MW
965281 AG1-393 C 50/50 1.2 MW 1.2 MW
965282 AG1-393 E 50/50 0.8 MW 0.8 MW
965601 AG1-428 C Adder 1.75 MW 1.49 MW
965602 AG1-428 E Adder 1.17 MW 0.99 MW
965691 AG1-437 C Adder 3.52 MW 2.99 MW
965692 AG1-437 E Adder 2.35 MW 2.0 MW
965701 AG1-438 C Adder 3.52 MW 2.99 MW
965702 AG1-438 E Adder 2.35 MW 2.0 MW
965741 AG1-442 C Adder 2.05 MW 1.75 MW
965751 AG1-443 C Adder 2.05 MW 1.75 MW
965811 AG1-449 C Adder 7.93 MW 6.74 MW
313764 3SOCKMAN Adder 0.28 MW 0.23 MW
932631 AC2-084 C Adder 2.35 MW 2.0 MW
932632 AC2-084 E Adder 1.16 MW 0.98 MW
934321 AD1-056 C Adder 2.32 MW 1.97 MW
934322 AD1-056 E Adder 1.26 MW 1.07 MW
934331 AD1-057 C Adder 1.29 MW 1.1 MW
934332 AD1-057 E Adder 0.67 MW 0.57 MW
934501 AD1-074 C Adder 11.53 MW 9.8 MW
934502 AD1-074 E Adder 5.87 MW 4.99 MW
934511 AD1-075 C Adder 2.88 MW 2.45 MW
934512 AD1-075 E Adder 1.47 MW 1.25 MW
935161 AD1-151 C Adder 8.56 MW 7.28 MW
935162 AD1-151 E Adder 5.71 MW 4.85 MW
938531 AE1-072 C Adder 5.61 MW 4.77 MW
938532 AE1-072 E Adder 2.93 MW 2.49 MW
939191 AE1-149 C 50/50 6.86 MW 6.86 MW
939192 AE1-149 E 50/50 4.57 MW 4.57 MW
940431 AE2-027 C Adder 6.64 MW 5.65 MW
940432 AE2-027 E Adder 4.43 MW 3.77 MW
940481 AE2-033 C Adder 8.34 MW 7.09 MW
940482 AE2-033 E Adder 5.62 MW 4.78 MW
940541 AE2-040 C Adder 1.51 MW 1.28 MW
940641 AE2-051 C Adder 5.84 MW 4.97 MW
940642 AE2-051 E Adder 3.89 MW 3.31 MW
941101 AE2-104 C Adder 1.2 MW 1.02 MW
941102 AE2-104 E Adder 1.91 MW 1.63 MW
941281 AE2-122 C Adder 9.09 MW 7.73 MW
941282 AE2-122 E Adder 36.69 MW 31.19 MW
944641 AF1-129 C 50/50 116.98 MW 116.98 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 9.1 MW 9.1 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.55 MW 6.55 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 28.66 MW 28.66 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.0 MW 1.0 MW
NY PJM->LTFIMP_NY CLTF 0.47 MW 0.47 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.36 MW 0.36 MW
WEC LTFEXP_WEC->PJM CLTF 0.19 MW 0.19 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.5 MW 3.5 MW
TVA LTFEXP_TVA->PJM CLTF 1.77 MW 1.77 MW
MEC LTFEXP_MEC->PJM CLTF 1.15 MW 1.15 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.26 MW 2.26 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.38 MW 6.38 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.67 MW 1.67 MW

Details for 8MORRSVL-8LOUDOUN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 568_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 8MORRSVL-8LOUDOUN 500.0 kV Ckt 1 line
314916 to 314913 ckt 1
DVP_P1-2: LN 568_SRT-S
CONTINGENCY 'DVP_P1-2: LN 568_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1                /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
END
OP AC 115.98 3220.44 B 3734.98 94.0
Elimination
Base Case Details for Eliminated Flowgate 8MORRSVL-8LOUDOUN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 568_SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314331 6POE Adder 0.85 MW 0.72 MW
314507 3THOMPSN Adder 1.27 MW 1.08 MW
314525 6KINGFORK Adder 0.64 MW 0.54 MW
314550 6HICKORY Adder 1.36 MW 1.16 MW
315021 1REMNGT1 50/50 3.77 MW 3.77 MW
315022 1REMNGT2 50/50 3.8 MW 3.8 MW
315023 1REMNGT3 50/50 4.28 MW 4.28 MW
315024 1REMNGT4 50/50 3.81 MW 3.81 MW
315028 1M RUN A 50/50 4.26 MW 4.26 MW
315029 1M RUN B 50/50 4.22 MW 4.22 MW
315030 1M RUN C 50/50 4.25 MW 4.25 MW
315060 1CHESTF5 Adder 39.87 MW 33.89 MW
315065 1CHESTF6 Adder 12.44 MW 10.58 MW
315073 1STONECA Adder 4.36 MW 3.71 MW
315083 1SPRUNCA Adder 5.82 MW 4.94 MW
315084 1SPRUNCB Adder 5.82 MW 4.94 MW
315092 1YORKTN3 Adder 88.21 MW 74.98 MW
926412 AC1-112 E Adder 0.7 MW 0.59 MW
926662 AC1-147 E Adder 0.83 MW 0.71 MW
926755 AC1-161 E Adder 8.14 MW 6.92 MW
927226 AC1-216 E Adder 4.87 MW 4.14 MW
934861 AD1-115 C 50/50 3.16 MW 3.16 MW
934862 AD1-115 E 50/50 5.15 MW 5.15 MW
935112 AD1-144 E Adder 0.59 MW 0.5 MW
942152 AE2-227 E Adder 0.92 MW 0.78 MW
942162 AE2-228 E Adder 0.91 MW 0.78 MW
942341 AE2-247 C Adder 0.93 MW 0.79 MW
942342 AE2-247 E Adder 1.29 MW 1.1 MW
943461 AF1-017 C Adder 0.84 MW 0.72 MW
943462 AF1-017 E Adder 1.38 MW 1.17 MW
315177 1S ANNAG1 50/50 1.62 MW 1.62 MW
315178 1S ANNAS1 50/50 0.83 MW 0.83 MW
315179 1S ANNAG2 50/50 1.62 MW 1.62 MW
315180 1S ANNAS2 50/50 0.83 MW 0.83 MW
315225 1N ANNA1 50/50 23.84 MW 23.84 MW
315226 1N ANNA2 50/50 23.86 MW 23.86 MW
315260 1GOSPORTA Adder 1.34 MW 1.14 MW
315261 1GOSPORTB Adder 1.71 MW 1.45 MW
315262 1GOSPORTC Adder 1.45 MW 1.23 MW
316076 AC2-137 E Adder 0.83 MW 0.71 MW
916192 Z1-068 E Adder 1.18 MW 1.0 MW
925022 AB2-158 E 50/50 4.22 MW 4.22 MW
930122 AB1-027 E Adder 0.86 MW 0.73 MW
938552 AE1-074 E Adder 0.8 MW 0.68 MW
939312 AE1-162 E Adder 0.9 MW 0.77 MW
946262 AF1-291 E Adder 0.91 MW 0.78 MW
962962 AG1-145 E Adder 0.9 MW 0.77 MW
963031 AG1-152 C 50/50 6.64 MW 6.64 MW
963032 AG1-152 E 50/50 9.96 MW 9.96 MW
966001 AG1-469 C 50/50 1.41 MW 1.41 MW
966002 AG1-469 E 50/50 0.7 MW 0.7 MW
925332 AB2-190 E Adder 5.1 MW 4.33 MW
925522 AC1-027 E Adder 0.76 MW 0.65 MW
925672 AC1-043 E 50/50 10.3 MW 10.3 MW
942001 AE2-212 C Adder 1.36 MW 1.16 MW
942002 AE2-212 E Adder 0.91 MW 0.77 MW
957871 AF2-081 C Adder 6.24 MW 5.3 MW
957872 AF2-081 E Adder 2.67 MW 2.27 MW
966331 AG1-502 C 50/50 10.61 MW 10.61 MW
966332 AG1-502 E 50/50 2.65 MW 2.65 MW
966341 AG1-503 C 50/50 2.65 MW 2.65 MW
966342 AG1-503 E 50/50 0.66 MW 0.66 MW
313811 6ELKO L286 Adder 0.87 MW 0.74 MW
933291 AC2-141 C Adder 19.08 MW 16.22 MW
933292 AC2-141 E Adder 8.14 MW 6.92 MW
939411 AE1-173 C Adder 54.47 MW 46.3 MW
939412 AE1-173 E Adder 36.31 MW 30.86 MW
923892 AB2-029 E 50/50 2.04 MW 2.04 MW
934011 AD1-025 C Adder 10.65 MW 9.05 MW
934012 AD1-025 E Adder 6.31 MW 5.36 MW
316160 AE1-175 E Adder 0.74 MW 0.63 MW
316164 AC1-076_C 50/50 0.62 MW 0.62 MW
316170 AC1-121 C 50/50 2.26 MW 2.26 MW
316192 AB2-158 C 50/50 1.48 MW 1.48 MW
316233 AE1-074 C Adder 1.58 MW 1.34 MW
316240 AF1-291 C Adder 1.37 MW 1.16 MW
316254 AC1-120 C 50/50 6.57 MW 6.57 MW
316257 AC1-043 C 50/50 6.31 MW 6.31 MW
316301 AE2-228 C Adder 1.37 MW 1.16 MW
316304 AE2-227 C Adder 1.38 MW 1.17 MW
926785 AC1-164_E Adder 11.23 MW 9.55 MW
934065 AD1-033 E Adder 3.14 MW 2.67 MW
937226 AE2-253 E Adder 3.65 MW 3.1 MW
963221 AG1-171 C Adder 1.36 MW 1.15 MW
963222 AG1-171 E Adder 0.9 MW 0.77 MW
963231 AG1-172 C Adder 1.36 MW 1.15 MW
963232 AG1-172 E Adder 0.9 MW 0.77 MW
963241 AG1-173 C Adder 1.36 MW 1.15 MW
963242 AG1-173 E Adder 0.9 MW 0.77 MW
926004 AC1-076_E 50/50 3.79 MW 3.79 MW
926486 AC1-120 E 50/50 3.38 MW 3.38 MW
926502 AC1-121 E 50/50 1.06 MW 1.06 MW
926615 AC1-143 E 50/50 3.13 MW 3.13 MW
316006 AB2-029 C 50/50 0.19 MW 0.19 MW
316267 AC1-143 C 50/50 6.87 MW 6.87 MW
316411 AF1-147_GEN1 Adder -4.05 MW -3.45 MW
316415 AF1-147_GEN2 Adder -4.05 MW -3.45 MW
919153 AA1-139 E2 Adder 2.55 MW 2.17 MW
919152 AA1-139 E1 Adder 2.55 MW 2.17 MW
924814 AB2-134 E Adder 7.98 MW 6.78 MW
316084 AB2-161 E Adder 3.48 MW 2.95 MW
316044 AC1-158 C1 50/50 5.25 MW 5.25 MW
316045 AC1-158 C2 50/50 5.25 MW 5.25 MW
926739 AC1-158 E1 50/50 14.72 MW 14.72 MW
926740 AC1-158 E2 50/50 14.72 MW 14.72 MW
932046 AC2-012 E Adder 8.22 MW 6.99 MW
932596 AC2-079 E Adder 2.0 MW 1.7 MW
934576 AD1-082 E Adder 2.77 MW 2.35 MW
316349 AD2-085 C Adder 2.16 MW 1.83 MW
936666 AD2-085 E Adder 3.52 MW 2.99 MW
961611 AG1-000B C Adder 10.03 MW 8.53 MW
941591 AE2-156 C Adder 11.23 MW 9.55 MW
942371 AE2-250 C Adder 6.13 MW 5.21 MW
942372 AE2-250 E Adder 3.24 MW 2.75 MW
944581 AF1-123 C Adder 28.47 MW 24.2 MW
944582 AF1-123 E Adder 65.2 MW 55.42 MW
944591 AF1-124 C Adder 28.57 MW 24.29 MW
944592 AF1-124 E Adder 65.43 MW 55.62 MW
944601 AF1-125 C Adder 28.03 MW 23.83 MW
944602 AF1-125 E Adder 64.17 MW 54.55 MW
944631 AF1-128 C Adder 24.95 MW 21.21 MW
957431 AF2-037 C 50/50 8.95 MW 8.95 MW
957432 AF2-037 E 50/50 5.96 MW 5.96 MW
957691 AF2-063 C 50/50 14.27 MW 14.27 MW
957692 AF2-063 E 50/50 9.52 MW 9.52 MW
962271 AG1-075 C Adder 10.58 MW 8.99 MW
962272 AG1-075 E Adder 6.45 MW 5.48 MW
964421 AG1-305 C 50/50 6.0 MW 6.0 MW
964422 AG1-305 E 50/50 4.0 MW 4.0 MW
965281 AG1-393 C Adder 1.36 MW 1.16 MW
965282 AG1-393 E Adder 0.91 MW 0.77 MW
935161 AD1-151 C Adder 10.18 MW 8.66 MW
935162 AD1-151 E Adder 6.79 MW 5.77 MW
938291 AE1-044 C 50/50 21.43 MW 21.43 MW
938292 AE1-044 E 50/50 16.91 MW 16.91 MW
938531 AE1-072 C Adder 10.96 MW 9.32 MW
938532 AE1-072 E Adder 5.71 MW 4.86 MW
939191 AE1-149 C Adder 6.76 MW 5.75 MW
939192 AE1-149 E Adder 4.51 MW 3.83 MW
939221 AE1-153 C 50/50 14.33 MW 14.33 MW
939222 AE1-153 E 50/50 9.55 MW 9.55 MW
940431 AE2-027 C Adder 8.17 MW 6.95 MW
940432 AE2-027 E Adder 5.45 MW 4.63 MW
940641 AE2-051 C Adder 10.26 MW 8.72 MW
940642 AE2-051 E Adder 6.84 MW 5.81 MW
941281 AE2-122 C Adder 17.82 MW 15.14 MW
941282 AE2-122 E Adder 71.9 MW 61.11 MW
944641 AF1-129 C Adder 64.9 MW 55.16 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 34.15 MW 34.15 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 19.53 MW 19.53 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 61.45 MW 61.45 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.79 MW 5.79 MW
NY PJM->LTFIMP_NY CLTF 2.59 MW 2.59 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.37 MW 1.37 MW
WEC LTFEXP_WEC->PJM CLTF 0.7 MW 0.7 MW
CPLE LTFEXP_CPLE->PJM CLTF 6.85 MW 6.85 MW
TVA LTFEXP_TVA->PJM CLTF 4.96 MW 4.96 MW
MEC LTFEXP_MEC->PJM CLTF 3.87 MW 3.87 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.17 MW 6.17 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.25 MW 0.25 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.81 MW 36.81 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 3.27 MW 3.27 MW

Details for AB2-190 TAP-6GARYSVILLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2197_SRT-A-2


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP AB2-190 TAP-6GARYSVILLE 230.0 kV Ckt 1 line
316099 to 313902 ckt 1
DVP_P1-2: LN 2197_SRT-A-2
CONTINGENCY 'DVP_P1-2: LN 2197_SRT-A-2'
 OPEN BRANCH FROM BUS 935160 TO BUS 314303 CKT 1   /*AD1-151 TP   230.0 - 6HOPEWLL     230.0
END
OP AC 102.3 678.68 B 694.31 56.51
Elimination
Base Case Details for Eliminated Flowgate AB2-190 TAP-6GARYSVILLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2197_SRT-A-2
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
940492 AE2-034 E Adder 0.97 MW 0.82 MW
916042 Z1-036 E Adder 10.33 MW 8.78 MW
314507 3THOMPSN Adder 1.03 MW 0.87 MW
314525 6KINGFORK Adder 0.56 MW 0.48 MW
314550 6HICKORY Adder 0.92 MW 0.78 MW
315092 1YORKTN3 Adder 50.88 MW 43.25 MW
926662 AC1-147 E Adder 0.67 MW 0.57 MW
927226 AC1-216 E 50/50 10.84 MW 10.84 MW
935112 AD1-144 E Adder 0.52 MW 0.44 MW
943612 AF1-032 E Adder 0.38 MW 0.32 MW
944871 AF1-152 C Adder 2.03 MW 1.72 MW
944872 AF1-152 E Adder 1.35 MW 1.15 MW
315116 1SURRY 1 50/50 32.17 MW 32.17 MW
315117 1GRAVELC 50/50 1.12 MW 1.12 MW
315119 1GRAVEL3 50/50 3.27 MW 3.27 MW
315120 1GRAVEL4 50/50 3.31 MW 3.31 MW
315121 1GRAVEL5 50/50 3.27 MW 3.27 MW
315122 1GRAVEL6 50/50 3.31 MW 3.31 MW
315260 1GOSPORTA Adder 1.08 MW 0.92 MW
315261 1GOSPORTB Adder 1.38 MW 1.17 MW
315262 1GOSPORTC Adder 1.17 MW 1.0 MW
316132 AB2-190 C 50/50 14.21 MW 14.21 MW
913392 Y1-086 E Adder 0.88 MW 0.74 MW
916192 Z1-068 E Adder 0.87 MW 0.74 MW
923832 AB2-022 E Adder 0.49 MW 0.42 MW
939312 AE1-162 E 50/50 1.52 MW 1.52 MW
957492 AF2-043 E Adder 0.58 MW 0.49 MW
901082 W1-029 E Adder 12.24 MW 10.4 MW
917122 Z2-027 E Adder 0.53 MW 0.45 MW
925332 AB2-190 E 50/50 29.1 MW 29.1 MW
925522 AC1-027 E Adder 0.57 MW 0.48 MW
941501 AE2-147 C Adder 6.08 MW 5.17 MW
941502 AE2-147 E Adder 4.06 MW 3.45 MW
942001 AE2-212 C Adder -0.66 MW -0.56 MW
957871 AF2-081 C Adder 4.14 MW 3.52 MW
957872 AF2-081 E Adder 1.78 MW 1.51 MW
958161 AF2-110 C Adder 0.46 MW 0.39 MW
958162 AF2-110 E Adder 0.73 MW 0.62 MW
934011 AD1-025 C 50/50 23.68 MW 23.68 MW
934012 AD1-025 E 50/50 14.03 MW 14.03 MW
314632 6AYDLETT TAP Adder 0.56 MW 0.47 MW
316236 AE1-162 C 50/50 0.34 MW 0.34 MW
316240 AF1-291 C Adder -0.82 MW -0.69 MW
316301 AE2-228 C Adder -0.79 MW -0.68 MW
316304 AE2-227 C Adder -0.7 MW -0.59 MW
316369 AC1-216 C 50/50 2.09 MW 2.09 MW
934065 AD1-033 E Adder 2.16 MW 1.83 MW
937226 AE2-253 E Adder 2.44 MW 2.07 MW
963221 AG1-171 C 50/50 3.02 MW 3.02 MW
963222 AG1-171 E 50/50 2.01 MW 2.01 MW
963231 AG1-172 C 50/50 3.02 MW 3.02 MW
963232 AG1-172 E 50/50 2.01 MW 2.01 MW
963241 AG1-173 C 50/50 3.02 MW 3.02 MW
963242 AG1-173 E 50/50 2.01 MW 2.01 MW
919153 AA1-139 E2 Adder 1.69 MW 1.44 MW
919152 AA1-139 E1 Adder 1.69 MW 1.44 MW
920692 AA2-178 E Adder 1.29 MW 1.1 MW
316033 AB2-134 GEN 50/50 2.73 MW 2.73 MW
924814 AB2-134 E 50/50 17.75 MW 17.75 MW
932046 AC2-012 E Adder 6.66 MW 5.66 MW
961611 AG1-000B C 50/50 28.59 MW 28.59 MW
941591 AE2-156 C Adder 9.02 MW 7.66 MW
944581 AF1-123 C Adder 17.11 MW 14.55 MW
944582 AF1-123 E Adder 39.19 MW 33.31 MW
944591 AF1-124 C Adder 17.18 MW 14.6 MW
944592 AF1-124 E Adder 39.33 MW 33.43 MW
944601 AF1-125 C Adder 16.85 MW 14.32 MW
944602 AF1-125 E Adder 38.58 MW 32.79 MW
935161 AD1-151 C 50/50 22.63 MW 22.63 MW
935162 AD1-151 E 50/50 15.09 MW 15.09 MW
938531 AE1-072 C Adder 7.23 MW 6.14 MW
938532 AE1-072 E Adder 3.77 MW 3.2 MW
941101 AE2-104 C Adder 1.12 MW 0.96 MW
941102 AE2-104 E Adder 1.79 MW 1.52 MW
941281 AE2-122 C Adder 13.07 MW 11.11 MW
941282 AE2-122 E Adder 52.73 MW 44.82 MW
944641 AF1-129 C Adder -40.56 MW -34.48 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.87 MW 0.87 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 7.27 MW 7.27 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.46 MW 0.46 MW
NY PJM->LTFIMP_NY CLTF 0.22 MW 0.22 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.01 MW 0.01 MW
WEC LTFEXP_WEC->PJM CLTF 0.0 MW 0.0 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.98 MW 0.98 MW
TVA LTFEXP_TVA->PJM CLTF 0.3 MW 0.3 MW
MEC LTFEXP_MEC->PJM CLTF 0.07 MW 0.07 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.39 MW 0.39 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.92 MW 2.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.47 MW 0.47 MW

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle #2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle #2.

Light Load Analysis

The New Service Request was evaluated as a 836.0 MW injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential light load period network impacts were as follows:

The following flowgates remain after considering the topology reinforcements required by the cycle.

Light Load Analysis
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Single AC 170.54 678.68 B 1157.41 380.47

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Single AC 170.54 678.68 B 1157.41 380.47
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Single AC 170.46 678.68 B 1156.88 380.3
Topology Case Flowgate Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315605 6W1-029WIND 80/20 2.18 MW 2.18 MW
315611 6Z1-036WIND 80/20 3.98 MW 3.98 MW
901082 W1-029 E 80/20 14.6 MW 14.6 MW
916042 Z1-036 E 80/20 26.7 MW 26.7 MW
916192 Z1-068 E 80/20 0.48 MW 0.48 MW
916191 Z1-068 C 80/20 0.07 MW 0.07 MW
941281 AE2-122 C 80/20 16.36 MW 16.36 MW
941282 AE2-122 E 80/20 66.0 MW 66.0 MW
944581 AF1-123 C 80/20 115.23 MW 115.23 MW
944582 AF1-123 E 80/20 263.87 MW 263.87 MW
944591 AF1-124 C 80/20 115.64 MW 115.64 MW
944592 AF1-124 E 80/20 264.83 MW 264.83 MW
944601 AF1-125 C 80/20 113.46 MW 113.46 MW
944602 AF1-125 E 80/20 259.73 MW 259.73 MW
965741 AG1-442 C 80/20 2.87 MW 2.87 MW
965751 AG1-443 C 80/20 2.87 MW 2.87 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Light Load Analysis
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Single AC 132.37 678.68 B 898.39 38.11
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 127.88 678.68 B 867.92 39.18
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Single AC 131.89 678.68 B 895.11 38.11
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 127.41 678.68 B 864.68 39.18
DVP 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer
314747 to 314744 ckt 1
DVP_P1-2: LN 2193_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2193_SRT-A'
 OPEN BRANCH FROM BUS 313707 TO BUS 313867 CKT 1   /*6FORK UNION  230.0 - 6BREMODIST   230.0
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BUS 313867                                   /*6BREMODIST   230.0
END
Single AC 127.73 307.38 B 392.62 17.45
DVP 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 110.04 661.76 B 728.22 34.55
DVP 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
DVP_P1-2: LN 553_SRT-L
CONTINGENCY 'DVP_P1-2: LN 553_SRT-L'
 OPEN BRANCH FROM BUS 314908 TO BUS 314910 CKT 1                /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
END
Single AC 103.54 661.76 B 685.16 34.06
DVP 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 108.77 661.76 B 719.8 34.55
DVP 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
DVP_P1-2: LN 553_SRT-L
CONTINGENCY 'DVP_P1-2: LN 553_SRT-L'
 OPEN BRANCH FROM BUS 314908 TO BUS 314910 CKT 1                /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
END
Single AC 102.26 661.76 B 676.74 34.06
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P1-2: LN 563_SRT-L-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-L-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 108.12 663.64 B 717.53 39.06
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 107.1 661.76 B 708.72 34.55
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
DVP_P1-2: LN 553_SRT-L
CONTINGENCY 'DVP_P1-2: LN 553_SRT-L'
 OPEN BRANCH FROM BUS 314908 TO BUS 314910 CKT 1                /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
END
Single AC 100.59 661.76 B 665.67 34.06
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
314218 to 314908 ckt 1
DVP_P4-2: H2T557_SRT-L
CONTINGENCY 'DVP_P4-2: H2T557_SRT-L'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 3300 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 3300 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 3118 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 3118 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Breaker AC 113.74 1065.0 C 1211.33 110.3

Details for 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Single AC 132.37 678.68 B 898.39 38.11
Elimination
Base Case Details for Eliminated Flowgate 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 9.35 MW 9.35 MW
315065 1CHESTF6 80/20 4.04 MW 4.04 MW
315083 1SPRUNCA 80/20 1.66 MW 1.66 MW
315084 1SPRUNCB 80/20 1.66 MW 1.66 MW
315605 6W1-029WIND 80/20 0.61 MW 0.61 MW
315611 6Z1-036WIND 80/20 1.1 MW 1.1 MW
901082 W1-029 E 80/20 4.1 MW 4.1 MW
916042 Z1-036 E 80/20 7.41 MW 7.41 MW
916192 Z1-068 E 80/20 0.24 MW 0.24 MW
941032 AE2-094 E 80/20 12.55 MW 12.55 MW
944012 AF1-069 E 80/20 4.1 MW 4.1 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.39 MW 0.39 MW
962342 AG1-083 E 80/20 0.39 MW 0.39 MW
963041 AG1-153 C 80/20 1.82 MW 1.82 MW
963042 AG1-153 E 80/20 2.74 MW 2.74 MW
964112 AG1-272 E 80/20 1.5 MW 1.5 MW
964122 AG1-273 E 80/20 1.5 MW 1.5 MW
964132 AG1-274 E 80/20 1.5 MW 1.5 MW
964801 AG1-343 C 80/20 0.31 MW 0.31 MW
964802 AG1-343 E 80/20 0.46 MW 0.46 MW
965192 AG1-384 E 80/20 1.5 MW 1.5 MW
966872 AG1-558 E 80/20 0.65 MW 0.65 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.74 MW 1.74 MW
940541 AE2-040 C 80/20 0.97 MW 0.97 MW
940551 AE2-041 C 80/20 2.1 MW 2.1 MW
941281 AE2-122 C 80/20 7.25 MW 7.25 MW
941282 AE2-122 E 80/20 29.25 MW 29.25 MW
941591 AE2-156 C 80/20 5.71 MW 5.71 MW
943471 AF1-018 C 80/20 2.1 MW 2.1 MW
943571 AF1-028 C Adder -15.97 MW -13.58 MW
944581 AF1-123 C 80/20 11.54 MW 11.54 MW
944582 AF1-123 E 80/20 26.43 MW 26.43 MW
944591 AF1-124 C 80/20 11.58 MW 11.58 MW
944592 AF1-124 E 80/20 26.52 MW 26.52 MW
944601 AF1-125 C 80/20 11.36 MW 11.36 MW
944602 AF1-125 E 80/20 26.02 MW 26.02 MW
944631 AF1-128 C 80/20 24.43 MW 24.43 MW
944641 AF1-129 C 80/20 35.13 MW 35.13 MW
961612 AG1-000B E 80/20 2.61 MW 2.61 MW
965741 AG1-442 C 80/20 1.95 MW 1.95 MW
965751 AG1-443 C 80/20 1.95 MW 1.95 MW
965811 AG1-449 C 80/20 7.69 MW 7.69 MW
965831 AG1-451 C 80/20 5.36 MW 5.36 MW
966871 AG1-558 C 80/20 0.07 MW 0.07 MW
316303 AF2-085 80/20 2.08 MW 2.08 MW
943573 AF1-028 BT 80/20 15.97 MW 15.97 MW
958502 AF2-144 E Adder 3.12 MW 2.65 MW
966673 AG1-537 BT 80/20 8.97 MW 8.97 MW

Details for 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 127.88 678.68 B 867.92 39.18
Elimination
Base Case Details for Eliminated Flowgate 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.36 MW 8.36 MW
315065 1CHESTF6 80/20 3.9 MW 3.9 MW
315083 1SPRUNCA 80/20 1.64 MW 1.64 MW
315084 1SPRUNCB 80/20 1.64 MW 1.64 MW
315131 1EDGECMA 80/20 2.56 MW 2.56 MW
315605 6W1-029WIND 80/20 0.64 MW 0.64 MW
315611 6Z1-036WIND 80/20 1.16 MW 1.16 MW
901082 W1-029 E 80/20 4.27 MW 4.27 MW
916042 Z1-036 E 80/20 7.78 MW 7.78 MW
916192 Z1-068 E 80/20 0.25 MW 0.25 MW
941032 AE2-094 E 80/20 14.65 MW 14.65 MW
944012 AF1-069 E 80/20 4.79 MW 4.79 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.43 MW 0.43 MW
962342 AG1-083 E 80/20 0.43 MW 0.43 MW
963041 AG1-153 C 80/20 2.13 MW 2.13 MW
963042 AG1-153 E 80/20 3.2 MW 3.2 MW
964112 AG1-272 E 80/20 1.6 MW 1.6 MW
964122 AG1-273 E 80/20 1.6 MW 1.6 MW
964132 AG1-274 E 80/20 1.6 MW 1.6 MW
964801 AG1-343 C 80/20 0.33 MW 0.33 MW
964802 AG1-343 E 80/20 0.5 MW 0.5 MW
965192 AG1-384 E 80/20 1.6 MW 1.6 MW
916191 Z1-068 C 80/20 0.04 MW 0.04 MW
961611 AG1-000B C 80/20 1.7 MW 1.7 MW
940541 AE2-040 C 80/20 1.06 MW 1.06 MW
941281 AE2-122 C 80/20 7.43 MW 7.43 MW
941282 AE2-122 E 80/20 30.0 MW 30.0 MW
941591 AE2-156 C 80/20 5.84 MW 5.84 MW
943571 AF1-028 C Adder -11.88 MW -10.1 MW
944581 AF1-123 C 80/20 11.87 MW 11.87 MW
944582 AF1-123 E 80/20 27.18 MW 27.18 MW
944591 AF1-124 C 80/20 11.91 MW 11.91 MW
944592 AF1-124 E 80/20 27.27 MW 27.27 MW
944601 AF1-125 C 80/20 11.69 MW 11.69 MW
944602 AF1-125 E 80/20 26.75 MW 26.75 MW
944631 AF1-128 C 80/20 21.85 MW 21.85 MW
944641 AF1-129 C 80/20 33.85 MW 33.85 MW
961602 AG1-000A E 80/20 1.99 MW 1.99 MW
961612 AG1-000B E 80/20 2.54 MW 2.54 MW
965741 AG1-442 C 80/20 2.11 MW 2.11 MW
965751 AG1-443 C 80/20 2.11 MW 2.11 MW
965761 AG1-444 C 80/20 4.55 MW 4.55 MW
965811 AG1-449 C 80/20 8.94 MW 8.94 MW
965831 AG1-451 C 80/20 5.63 MW 5.63 MW
316303 AF2-085 80/20 2.28 MW 2.28 MW
943573 AF1-028 BT 80/20 11.88 MW 11.88 MW
958502 AF2-144 E Adder 3.28 MW 2.79 MW
966673 AG1-537 BT 80/20 6.88 MW 6.88 MW

Details for 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Single AC 131.89 678.68 B 895.11 38.11
Elimination
Base Case Details for Eliminated Flowgate 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 9.35 MW 9.35 MW
315065 1CHESTF6 80/20 4.04 MW 4.04 MW
315083 1SPRUNCA 80/20 1.66 MW 1.66 MW
315084 1SPRUNCB 80/20 1.66 MW 1.66 MW
315605 6W1-029WIND 80/20 0.61 MW 0.61 MW
315611 6Z1-036WIND 80/20 1.1 MW 1.1 MW
901082 W1-029 E 80/20 4.1 MW 4.1 MW
916042 Z1-036 E 80/20 7.41 MW 7.41 MW
916192 Z1-068 E 80/20 0.24 MW 0.24 MW
941032 AE2-094 E 80/20 12.55 MW 12.55 MW
944012 AF1-069 E 80/20 4.1 MW 4.1 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.39 MW 0.39 MW
962342 AG1-083 E 80/20 0.39 MW 0.39 MW
963041 AG1-153 C 80/20 1.82 MW 1.82 MW
963042 AG1-153 E 80/20 2.74 MW 2.74 MW
964112 AG1-272 E 80/20 1.5 MW 1.5 MW
964122 AG1-273 E 80/20 1.5 MW 1.5 MW
964132 AG1-274 E 80/20 1.5 MW 1.5 MW
964801 AG1-343 C 80/20 0.31 MW 0.31 MW
964802 AG1-343 E 80/20 0.46 MW 0.46 MW
965192 AG1-384 E 80/20 1.5 MW 1.5 MW
966872 AG1-558 E 80/20 0.65 MW 0.65 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.74 MW 1.74 MW
940541 AE2-040 C 80/20 0.97 MW 0.97 MW
940551 AE2-041 C 80/20 2.1 MW 2.1 MW
941281 AE2-122 C 80/20 7.25 MW 7.25 MW
941282 AE2-122 E 80/20 29.25 MW 29.25 MW
941591 AE2-156 C 80/20 5.71 MW 5.71 MW
943471 AF1-018 C 80/20 2.1 MW 2.1 MW
943571 AF1-028 C Adder -15.97 MW -13.58 MW
944581 AF1-123 C 80/20 11.54 MW 11.54 MW
944582 AF1-123 E 80/20 26.43 MW 26.43 MW
944591 AF1-124 C 80/20 11.58 MW 11.58 MW
944592 AF1-124 E 80/20 26.52 MW 26.52 MW
944601 AF1-125 C 80/20 11.36 MW 11.36 MW
944602 AF1-125 E 80/20 26.02 MW 26.02 MW
944631 AF1-128 C 80/20 24.43 MW 24.43 MW
944641 AF1-129 C 80/20 35.13 MW 35.13 MW
961612 AG1-000B E 80/20 2.61 MW 2.61 MW
965741 AG1-442 C 80/20 1.95 MW 1.95 MW
965751 AG1-443 C 80/20 1.95 MW 1.95 MW
965811 AG1-449 C 80/20 7.69 MW 7.69 MW
965831 AG1-451 C 80/20 5.36 MW 5.36 MW
966871 AG1-558 C 80/20 0.07 MW 0.07 MW
316303 AF2-085 80/20 2.08 MW 2.08 MW
943573 AF1-028 BT 80/20 15.97 MW 15.97 MW
958502 AF2-144 E Adder 3.12 MW 2.65 MW
966673 AG1-537 BT 80/20 8.97 MW 8.97 MW

Details for 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 127.41 678.68 B 864.68 39.18
Elimination
Base Case Details for Eliminated Flowgate 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.36 MW 8.36 MW
315065 1CHESTF6 80/20 3.9 MW 3.9 MW
315083 1SPRUNCA 80/20 1.64 MW 1.64 MW
315084 1SPRUNCB 80/20 1.64 MW 1.64 MW
315131 1EDGECMA 80/20 2.56 MW 2.56 MW
315605 6W1-029WIND 80/20 0.64 MW 0.64 MW
315611 6Z1-036WIND 80/20 1.16 MW 1.16 MW
901082 W1-029 E 80/20 4.27 MW 4.27 MW
916042 Z1-036 E 80/20 7.78 MW 7.78 MW
916192 Z1-068 E 80/20 0.25 MW 0.25 MW
941032 AE2-094 E 80/20 14.65 MW 14.65 MW
944012 AF1-069 E 80/20 4.79 MW 4.79 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.43 MW 0.43 MW
962342 AG1-083 E 80/20 0.43 MW 0.43 MW
963041 AG1-153 C 80/20 2.13 MW 2.13 MW
963042 AG1-153 E 80/20 3.2 MW 3.2 MW
964112 AG1-272 E 80/20 1.6 MW 1.6 MW
964122 AG1-273 E 80/20 1.6 MW 1.6 MW
964132 AG1-274 E 80/20 1.6 MW 1.6 MW
964801 AG1-343 C 80/20 0.33 MW 0.33 MW
964802 AG1-343 E 80/20 0.5 MW 0.5 MW
965192 AG1-384 E 80/20 1.6 MW 1.6 MW
916191 Z1-068 C 80/20 0.04 MW 0.04 MW
961611 AG1-000B C 80/20 1.7 MW 1.7 MW
940541 AE2-040 C 80/20 1.06 MW 1.06 MW
941281 AE2-122 C 80/20 7.43 MW 7.43 MW
941282 AE2-122 E 80/20 30.0 MW 30.0 MW
941591 AE2-156 C 80/20 5.84 MW 5.84 MW
943571 AF1-028 C Adder -11.88 MW -10.1 MW
944581 AF1-123 C 80/20 11.87 MW 11.87 MW
944582 AF1-123 E 80/20 27.18 MW 27.18 MW
944591 AF1-124 C 80/20 11.91 MW 11.91 MW
944592 AF1-124 E 80/20 27.27 MW 27.27 MW
944601 AF1-125 C 80/20 11.69 MW 11.69 MW
944602 AF1-125 E 80/20 26.75 MW 26.75 MW
944631 AF1-128 C 80/20 21.85 MW 21.85 MW
944641 AF1-129 C 80/20 33.85 MW 33.85 MW
961602 AG1-000A E 80/20 1.99 MW 1.99 MW
961612 AG1-000B E 80/20 2.54 MW 2.54 MW
965741 AG1-442 C 80/20 2.11 MW 2.11 MW
965751 AG1-443 C 80/20 2.11 MW 2.11 MW
965761 AG1-444 C 80/20 4.55 MW 4.55 MW
965811 AG1-449 C 80/20 8.94 MW 8.94 MW
965831 AG1-451 C 80/20 5.63 MW 5.63 MW
316303 AF2-085 80/20 2.28 MW 2.28 MW
943573 AF1-028 BT 80/20 11.88 MW 11.88 MW
958502 AF2-144 E Adder 3.28 MW 2.79 MW
966673 AG1-537 BT 80/20 6.88 MW 6.88 MW

Details for 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 2193_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer
314747 to 314744 ckt 1
DVP_P1-2: LN 2193_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2193_SRT-A'
 OPEN BRANCH FROM BUS 313707 TO BUS 313867 CKT 1   /*6FORK UNION  230.0 - 6BREMODIST   230.0
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BUS 313867                                   /*6BREMODIST   230.0
END
Single AC 127.73 307.38 B 392.62 17.45
Elimination
Base Case Details for Eliminated Flowgate 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 2193_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
964112 AG1-272 E 80/20 0.88 MW 0.88 MW
964122 AG1-273 E 80/20 0.88 MW 0.88 MW
964132 AG1-274 E 80/20 0.88 MW 0.88 MW
965192 AG1-384 E 80/20 0.88 MW 0.88 MW
941281 AE2-122 C Adder 3.32 MW 2.82 MW
941282 AE2-122 E Adder 13.4 MW 11.39 MW
944581 AF1-123 C Adder 5.28 MW 4.49 MW
944582 AF1-123 E Adder 12.1 MW 10.29 MW
944591 AF1-124 C Adder 5.3 MW 4.51 MW
944592 AF1-124 E Adder 12.15 MW 10.32 MW
944601 AF1-125 C Adder 5.2 MW 4.42 MW
944602 AF1-125 E Adder 11.91 MW 10.12 MW
944641 AF1-129 C Adder 16.2 MW 13.77 MW
965831 AG1-451 C 80/20 3.23 MW 3.23 MW
316303 AF2-085 80/20 1.12 MW 1.12 MW
958502 AF2-144 E Adder 1.86 MW 1.58 MW
966253 AG1-494 BT 80/20 3.83 MW 3.83 MW
966673 AG1-537 BT 80/20 5.33 MW 5.33 MW

Details for 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 110.04 661.76 B 728.22 34.55
Elimination
Base Case Details for Eliminated Flowgate 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 80/20 3.4 MW 3.4 MW
315083 1SPRUNCA 80/20 1.43 MW 1.43 MW
315084 1SPRUNCB 80/20 1.43 MW 1.43 MW
315131 1EDGECMA 80/20 2.35 MW 2.35 MW
315605 6W1-029WIND 80/20 0.56 MW 0.56 MW
315611 6Z1-036WIND 80/20 1.03 MW 1.03 MW
901082 W1-029 E 80/20 3.78 MW 3.78 MW
916042 Z1-036 E 80/20 6.92 MW 6.92 MW
916192 Z1-068 E 80/20 0.22 MW 0.22 MW
941032 AE2-094 E 80/20 13.1 MW 13.1 MW
944012 AF1-069 E 80/20 4.28 MW 4.28 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.39 MW 0.39 MW
962342 AG1-083 E 80/20 0.39 MW 0.39 MW
963041 AG1-153 C 80/20 1.91 MW 1.91 MW
963042 AG1-153 E 80/20 2.87 MW 2.87 MW
964112 AG1-272 E 80/20 1.44 MW 1.44 MW
964122 AG1-273 E 80/20 1.44 MW 1.44 MW
964132 AG1-274 E 80/20 1.44 MW 1.44 MW
964801 AG1-343 C 80/20 0.3 MW 0.3 MW
964802 AG1-343 E 80/20 0.45 MW 0.45 MW
965192 AG1-384 E 80/20 1.44 MW 1.44 MW
966251 AG1-494 C 80/20 1.21 MW 1.21 MW
966252 AG1-494 E 80/20 1.82 MW 1.82 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
940541 AE2-040 C 80/20 0.94 MW 0.94 MW
941281 AE2-122 C 80/20 6.56 MW 6.56 MW
941282 AE2-122 E 80/20 26.45 MW 26.45 MW
941591 AE2-156 C 80/20 5.14 MW 5.14 MW
943571 AF1-028 C Adder -11.39 MW -9.68 MW
944581 AF1-123 C 80/20 10.46 MW 10.46 MW
944582 AF1-123 E 80/20 23.96 MW 23.96 MW
944591 AF1-124 C 80/20 10.5 MW 10.5 MW
944592 AF1-124 E 80/20 24.05 MW 24.05 MW
944601 AF1-125 C 80/20 10.3 MW 10.3 MW
944602 AF1-125 E 80/20 23.59 MW 23.59 MW
944641 AF1-129 C 80/20 29.6 MW 29.6 MW
961602 AG1-000A E 80/20 1.82 MW 1.82 MW
965741 AG1-442 C 80/20 1.9 MW 1.9 MW
965751 AG1-443 C 80/20 1.9 MW 1.9 MW
965761 AG1-444 C 80/20 4.16 MW 4.16 MW
965811 AG1-449 C 80/20 8.0 MW 8.0 MW
965831 AG1-451 C 80/20 5.05 MW 5.05 MW
316303 AF2-085 80/20 2.02 MW 2.02 MW
943573 AF1-028 BT 80/20 11.39 MW 11.39 MW
958502 AF2-144 E Adder 2.92 MW 2.48 MW
966673 AG1-537 BT 80/20 4.79 MW 4.79 MW

Details for 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 553_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
DVP_P1-2: LN 553_SRT-L
CONTINGENCY 'DVP_P1-2: LN 553_SRT-L'
 OPEN BRANCH FROM BUS 314908 TO BUS 314910 CKT 1                /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
END
Single AC 103.54 661.76 B 685.16 34.06
Elimination
Base Case Details for Eliminated Flowgate 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 553_SRT-L
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.27 MW 8.27 MW
315065 1CHESTF6 80/20 3.59 MW 3.59 MW
315083 1SPRUNCA 80/20 1.47 MW 1.47 MW
315084 1SPRUNCB 80/20 1.47 MW 1.47 MW
315605 6W1-029WIND 80/20 0.55 MW 0.55 MW
315611 6Z1-036WIND 80/20 0.99 MW 0.99 MW
901082 W1-029 E 80/20 3.68 MW 3.68 MW
916042 Z1-036 E 80/20 6.67 MW 6.67 MW
916192 Z1-068 E 80/20 0.21 MW 0.21 MW
941032 AE2-094 E 80/20 11.31 MW 11.31 MW
944012 AF1-069 E 80/20 3.7 MW 3.7 MW
961942 AG1-037 E 80/20 0.09 MW 0.09 MW
962332 AG1-082 E 80/20 0.36 MW 0.36 MW
962342 AG1-083 E 80/20 0.36 MW 0.36 MW
963041 AG1-153 C 80/20 1.65 MW 1.65 MW
963042 AG1-153 E 80/20 2.48 MW 2.48 MW
964112 AG1-272 E 80/20 1.36 MW 1.36 MW
964122 AG1-273 E 80/20 1.36 MW 1.36 MW
964132 AG1-274 E 80/20 1.36 MW 1.36 MW
964801 AG1-343 C 80/20 0.28 MW 0.28 MW
964802 AG1-343 E 80/20 0.42 MW 0.42 MW
965192 AG1-384 E 80/20 1.36 MW 1.36 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.55 MW 1.55 MW
940541 AE2-040 C 80/20 0.87 MW 0.87 MW
941281 AE2-122 C 80/20 6.48 MW 6.48 MW
941282 AE2-122 E 80/20 26.15 MW 26.15 MW
941591 AE2-156 C 80/20 5.1 MW 5.1 MW
943571 AF1-028 C Adder -14.88 MW -12.65 MW
944581 AF1-123 C 80/20 10.31 MW 10.31 MW
944582 AF1-123 E 80/20 23.62 MW 23.62 MW
944591 AF1-124 C 80/20 10.35 MW 10.35 MW
944592 AF1-124 E 80/20 23.7 MW 23.7 MW
944601 AF1-125 C 80/20 10.15 MW 10.15 MW
944602 AF1-125 E 80/20 23.25 MW 23.25 MW
944631 AF1-128 C 80/20 21.61 MW 21.61 MW
944641 AF1-129 C 80/20 31.2 MW 31.2 MW
961612 AG1-000B E 80/20 2.32 MW 2.32 MW
965741 AG1-442 C 80/20 1.77 MW 1.77 MW
965751 AG1-443 C 80/20 1.77 MW 1.77 MW
965811 AG1-449 C 80/20 6.95 MW 6.95 MW
965831 AG1-451 C 80/20 4.82 MW 4.82 MW
316303 AF2-085 80/20 1.85 MW 1.85 MW
943573 AF1-028 BT 80/20 14.88 MW 14.88 MW
958502 AF2-144 E Adder 2.78 MW 2.37 MW
966673 AG1-537 BT 80/20 6.6 MW 6.6 MW

Details for 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 108.77 661.76 B 719.8 34.55
Elimination
Base Case Details for Eliminated Flowgate 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 80/20 3.4 MW 3.4 MW
315083 1SPRUNCA 80/20 1.43 MW 1.43 MW
315084 1SPRUNCB 80/20 1.43 MW 1.43 MW
315131 1EDGECMA 80/20 2.35 MW 2.35 MW
315605 6W1-029WIND 80/20 0.56 MW 0.56 MW
315611 6Z1-036WIND 80/20 1.03 MW 1.03 MW
901082 W1-029 E 80/20 3.78 MW 3.78 MW
916042 Z1-036 E 80/20 6.92 MW 6.92 MW
916192 Z1-068 E 80/20 0.22 MW 0.22 MW
941032 AE2-094 E 80/20 13.1 MW 13.1 MW
944012 AF1-069 E 80/20 4.28 MW 4.28 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.39 MW 0.39 MW
962342 AG1-083 E 80/20 0.39 MW 0.39 MW
963041 AG1-153 C 80/20 1.91 MW 1.91 MW
963042 AG1-153 E 80/20 2.87 MW 2.87 MW
964112 AG1-272 E 80/20 1.44 MW 1.44 MW
964122 AG1-273 E 80/20 1.44 MW 1.44 MW
964132 AG1-274 E 80/20 1.44 MW 1.44 MW
964801 AG1-343 C 80/20 0.3 MW 0.3 MW
964802 AG1-343 E 80/20 0.45 MW 0.45 MW
965192 AG1-384 E 80/20 1.44 MW 1.44 MW
966251 AG1-494 C 80/20 1.21 MW 1.21 MW
966252 AG1-494 E 80/20 1.82 MW 1.82 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
940541 AE2-040 C 80/20 0.94 MW 0.94 MW
941281 AE2-122 C 80/20 6.56 MW 6.56 MW
941282 AE2-122 E 80/20 26.45 MW 26.45 MW
941591 AE2-156 C 80/20 5.14 MW 5.14 MW
943571 AF1-028 C Adder -11.39 MW -9.68 MW
944581 AF1-123 C 80/20 10.46 MW 10.46 MW
944582 AF1-123 E 80/20 23.96 MW 23.96 MW
944591 AF1-124 C 80/20 10.5 MW 10.5 MW
944592 AF1-124 E 80/20 24.05 MW 24.05 MW
944601 AF1-125 C 80/20 10.3 MW 10.3 MW
944602 AF1-125 E 80/20 23.59 MW 23.59 MW
944641 AF1-129 C 80/20 29.6 MW 29.6 MW
961602 AG1-000A E 80/20 1.82 MW 1.82 MW
965741 AG1-442 C 80/20 1.9 MW 1.9 MW
965751 AG1-443 C 80/20 1.9 MW 1.9 MW
965761 AG1-444 C 80/20 4.16 MW 4.16 MW
965811 AG1-449 C 80/20 8.0 MW 8.0 MW
965831 AG1-451 C 80/20 5.05 MW 5.05 MW
316303 AF2-085 80/20 2.02 MW 2.02 MW
943573 AF1-028 BT 80/20 11.39 MW 11.39 MW
958502 AF2-144 E Adder 2.92 MW 2.48 MW
966673 AG1-537 BT 80/20 4.79 MW 4.79 MW

Details for 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 553_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
DVP_P1-2: LN 553_SRT-L
CONTINGENCY 'DVP_P1-2: LN 553_SRT-L'
 OPEN BRANCH FROM BUS 314908 TO BUS 314910 CKT 1                /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
END
Single AC 102.26 661.76 B 676.74 34.06
Elimination
Base Case Details for Eliminated Flowgate 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 553_SRT-L
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.27 MW 8.27 MW
315065 1CHESTF6 80/20 3.59 MW 3.59 MW
315083 1SPRUNCA 80/20 1.47 MW 1.47 MW
315084 1SPRUNCB 80/20 1.47 MW 1.47 MW
315605 6W1-029WIND 80/20 0.55 MW 0.55 MW
315611 6Z1-036WIND 80/20 0.99 MW 0.99 MW
901082 W1-029 E 80/20 3.68 MW 3.68 MW
916042 Z1-036 E 80/20 6.67 MW 6.67 MW
916192 Z1-068 E 80/20 0.21 MW 0.21 MW
941032 AE2-094 E 80/20 11.31 MW 11.31 MW
944012 AF1-069 E 80/20 3.7 MW 3.7 MW
961942 AG1-037 E 80/20 0.09 MW 0.09 MW
962332 AG1-082 E 80/20 0.36 MW 0.36 MW
962342 AG1-083 E 80/20 0.36 MW 0.36 MW
963041 AG1-153 C 80/20 1.65 MW 1.65 MW
963042 AG1-153 E 80/20 2.48 MW 2.48 MW
964112 AG1-272 E 80/20 1.36 MW 1.36 MW
964122 AG1-273 E 80/20 1.36 MW 1.36 MW
964132 AG1-274 E 80/20 1.36 MW 1.36 MW
964801 AG1-343 C 80/20 0.28 MW 0.28 MW
964802 AG1-343 E 80/20 0.42 MW 0.42 MW
965192 AG1-384 E 80/20 1.36 MW 1.36 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.55 MW 1.55 MW
940541 AE2-040 C 80/20 0.87 MW 0.87 MW
941281 AE2-122 C 80/20 6.48 MW 6.48 MW
941282 AE2-122 E 80/20 26.15 MW 26.15 MW
941591 AE2-156 C 80/20 5.1 MW 5.1 MW
943571 AF1-028 C Adder -14.88 MW -12.65 MW
944581 AF1-123 C 80/20 10.31 MW 10.31 MW
944582 AF1-123 E 80/20 23.62 MW 23.62 MW
944591 AF1-124 C 80/20 10.35 MW 10.35 MW
944592 AF1-124 E 80/20 23.7 MW 23.7 MW
944601 AF1-125 C 80/20 10.15 MW 10.15 MW
944602 AF1-125 E 80/20 23.25 MW 23.25 MW
944631 AF1-128 C 80/20 21.61 MW 21.61 MW
944641 AF1-129 C 80/20 31.2 MW 31.2 MW
961612 AG1-000B E 80/20 2.32 MW 2.32 MW
965741 AG1-442 C 80/20 1.77 MW 1.77 MW
965751 AG1-443 C 80/20 1.77 MW 1.77 MW
965811 AG1-449 C 80/20 6.95 MW 6.95 MW
965831 AG1-451 C 80/20 4.82 MW 4.82 MW
316303 AF2-085 80/20 1.85 MW 1.85 MW
943573 AF1-028 BT 80/20 14.88 MW 14.88 MW
958502 AF2-144 E Adder 2.78 MW 2.37 MW
966673 AG1-537 BT 80/20 6.6 MW 6.6 MW

Details for 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-L-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P1-2: LN 563_SRT-L-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-L-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 108.12 663.64 B 717.53 39.06
Elimination
Base Case Details for Eliminated Flowgate 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-L-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 80/20 15.65 MW 15.65 MW
315131 1EDGECMA 80/20 2.56 MW 2.56 MW
315605 6W1-029WIND 80/20 0.66 MW 0.66 MW
315611 6Z1-036WIND 80/20 1.2 MW 1.2 MW
901082 W1-029 E 80/20 4.42 MW 4.42 MW
916042 Z1-036 E 80/20 8.04 MW 8.04 MW
916192 Z1-068 E 80/20 0.25 MW 0.25 MW
941032 AE2-094 E 80/20 14.54 MW 14.54 MW
944012 AF1-069 E 80/20 4.75 MW 4.75 MW
961942 AG1-037 E 80/20 0.11 MW 0.11 MW
962332 AG1-082 E 80/20 0.43 MW 0.43 MW
962342 AG1-083 E 80/20 0.43 MW 0.43 MW
963041 AG1-153 C 80/20 2.0 MW 2.0 MW
963042 AG1-153 E 80/20 3.01 MW 3.01 MW
964801 AG1-343 C 80/20 0.33 MW 0.33 MW
964802 AG1-343 E 80/20 0.5 MW 0.5 MW
916191 Z1-068 C 80/20 0.04 MW 0.04 MW
961611 AG1-000B C 80/20 2.51 MW 2.51 MW
940541 AE2-040 C 80/20 1.65 MW 1.65 MW
941281 AE2-122 C 80/20 7.68 MW 7.68 MW
941282 AE2-122 E 80/20 30.99 MW 30.99 MW
941591 AE2-156 C 80/20 6.11 MW 6.11 MW
944581 AF1-123 C 80/20 11.83 MW 11.83 MW
944582 AF1-123 E 80/20 27.09 MW 27.09 MW
944591 AF1-124 C 80/20 11.87 MW 11.87 MW
944592 AF1-124 E 80/20 27.19 MW 27.19 MW
944601 AF1-125 C 80/20 11.65 MW 11.65 MW
944602 AF1-125 E 80/20 26.66 MW 26.66 MW
944641 AF1-129 C 80/20 136.07 MW 136.07 MW
961602 AG1-000A E 80/20 1.99 MW 1.99 MW
961612 AG1-000B E 80/20 3.77 MW 3.77 MW
965741 AG1-442 C 80/20 2.19 MW 2.19 MW
965751 AG1-443 C 80/20 2.19 MW 2.19 MW
965761 AG1-444 C 80/20 4.57 MW 4.57 MW
965811 AG1-449 C 80/20 8.42 MW 8.42 MW
974591 AF2-085 BE 80/20 1.82 MW 1.82 MW

Details for 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 107.1 661.76 B 708.72 34.55
Elimination
Base Case Details for Eliminated Flowgate 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 80/20 3.4 MW 3.4 MW
315083 1SPRUNCA 80/20 1.43 MW 1.43 MW
315084 1SPRUNCB 80/20 1.43 MW 1.43 MW
315131 1EDGECMA 80/20 2.35 MW 2.35 MW
315605 6W1-029WIND 80/20 0.56 MW 0.56 MW
315611 6Z1-036WIND 80/20 1.03 MW 1.03 MW
901082 W1-029 E 80/20 3.78 MW 3.78 MW
916042 Z1-036 E 80/20 6.92 MW 6.92 MW
916192 Z1-068 E 80/20 0.22 MW 0.22 MW
941032 AE2-094 E 80/20 13.1 MW 13.1 MW
944012 AF1-069 E 80/20 4.28 MW 4.28 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.39 MW 0.39 MW
962342 AG1-083 E 80/20 0.39 MW 0.39 MW
963041 AG1-153 C 80/20 1.91 MW 1.91 MW
963042 AG1-153 E 80/20 2.87 MW 2.87 MW
964112 AG1-272 E 80/20 1.44 MW 1.44 MW
964122 AG1-273 E 80/20 1.44 MW 1.44 MW
964132 AG1-274 E 80/20 1.44 MW 1.44 MW
964801 AG1-343 C 80/20 0.3 MW 0.3 MW
964802 AG1-343 E 80/20 0.45 MW 0.45 MW
965192 AG1-384 E 80/20 1.44 MW 1.44 MW
966251 AG1-494 C 80/20 1.21 MW 1.21 MW
966252 AG1-494 E 80/20 1.82 MW 1.82 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
940541 AE2-040 C 80/20 0.94 MW 0.94 MW
941281 AE2-122 C 80/20 6.56 MW 6.56 MW
941282 AE2-122 E 80/20 26.45 MW 26.45 MW
941591 AE2-156 C 80/20 5.14 MW 5.14 MW
943571 AF1-028 C Adder -11.39 MW -9.68 MW
944581 AF1-123 C 80/20 10.46 MW 10.46 MW
944582 AF1-123 E 80/20 23.96 MW 23.96 MW
944591 AF1-124 C 80/20 10.5 MW 10.5 MW
944592 AF1-124 E 80/20 24.05 MW 24.05 MW
944601 AF1-125 C 80/20 10.3 MW 10.3 MW
944602 AF1-125 E 80/20 23.59 MW 23.59 MW
944641 AF1-129 C 80/20 29.6 MW 29.6 MW
961602 AG1-000A E 80/20 1.82 MW 1.82 MW
965741 AG1-442 C 80/20 1.9 MW 1.9 MW
965751 AG1-443 C 80/20 1.9 MW 1.9 MW
965761 AG1-444 C 80/20 4.16 MW 4.16 MW
965811 AG1-449 C 80/20 8.0 MW 8.0 MW
965831 AG1-451 C 80/20 5.05 MW 5.05 MW
316303 AF2-085 80/20 2.02 MW 2.02 MW
943573 AF1-028 BT 80/20 11.39 MW 11.39 MW
958502 AF2-144 E Adder 2.92 MW 2.48 MW
966673 AG1-537 BT 80/20 4.79 MW 4.79 MW

Details for 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 553_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
DVP_P1-2: LN 553_SRT-L
CONTINGENCY 'DVP_P1-2: LN 553_SRT-L'
 OPEN BRANCH FROM BUS 314908 TO BUS 314910 CKT 1                /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
END
Single AC 100.59 661.76 B 665.67 34.06
Elimination
Base Case Details for Eliminated Flowgate 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 553_SRT-L
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.27 MW 8.27 MW
315065 1CHESTF6 80/20 3.59 MW 3.59 MW
315083 1SPRUNCA 80/20 1.47 MW 1.47 MW
315084 1SPRUNCB 80/20 1.47 MW 1.47 MW
315605 6W1-029WIND 80/20 0.55 MW 0.55 MW
315611 6Z1-036WIND 80/20 0.99 MW 0.99 MW
901082 W1-029 E 80/20 3.68 MW 3.68 MW
916042 Z1-036 E 80/20 6.67 MW 6.67 MW
916192 Z1-068 E 80/20 0.21 MW 0.21 MW
941032 AE2-094 E 80/20 11.31 MW 11.31 MW
944012 AF1-069 E 80/20 3.7 MW 3.7 MW
961942 AG1-037 E 80/20 0.09 MW 0.09 MW
962332 AG1-082 E 80/20 0.36 MW 0.36 MW
962342 AG1-083 E 80/20 0.36 MW 0.36 MW
963041 AG1-153 C 80/20 1.65 MW 1.65 MW
963042 AG1-153 E 80/20 2.48 MW 2.48 MW
964112 AG1-272 E 80/20 1.36 MW 1.36 MW
964122 AG1-273 E 80/20 1.36 MW 1.36 MW
964132 AG1-274 E 80/20 1.36 MW 1.36 MW
964801 AG1-343 C 80/20 0.28 MW 0.28 MW
964802 AG1-343 E 80/20 0.42 MW 0.42 MW
965192 AG1-384 E 80/20 1.36 MW 1.36 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.55 MW 1.55 MW
940541 AE2-040 C 80/20 0.87 MW 0.87 MW
941281 AE2-122 C 80/20 6.48 MW 6.48 MW
941282 AE2-122 E 80/20 26.15 MW 26.15 MW
941591 AE2-156 C 80/20 5.1 MW 5.1 MW
943571 AF1-028 C Adder -14.88 MW -12.65 MW
944581 AF1-123 C 80/20 10.31 MW 10.31 MW
944582 AF1-123 E 80/20 23.62 MW 23.62 MW
944591 AF1-124 C 80/20 10.35 MW 10.35 MW
944592 AF1-124 E 80/20 23.7 MW 23.7 MW
944601 AF1-125 C 80/20 10.15 MW 10.15 MW
944602 AF1-125 E 80/20 23.25 MW 23.25 MW
944631 AF1-128 C 80/20 21.61 MW 21.61 MW
944641 AF1-129 C 80/20 31.2 MW 31.2 MW
961612 AG1-000B E 80/20 2.32 MW 2.32 MW
965741 AG1-442 C 80/20 1.77 MW 1.77 MW
965751 AG1-443 C 80/20 1.77 MW 1.77 MW
965811 AG1-449 C 80/20 6.95 MW 6.95 MW
965831 AG1-451 C 80/20 4.82 MW 4.82 MW
316303 AF2-085 80/20 1.85 MW 1.85 MW
943573 AF1-028 BT 80/20 14.88 MW 14.88 MW
958502 AF2-144 E Adder 2.78 MW 2.37 MW
966673 AG1-537 BT 80/20 6.6 MW 6.6 MW

Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H2T557_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
314218 to 314908 ckt 1
DVP_P4-2: H2T557_SRT-L
CONTINGENCY 'DVP_P4-2: H2T557_SRT-L'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 3300 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 3300 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 3118 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 3118 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Breaker AC 113.74 1065.0 C 1211.33 110.3
Elimination
Base Case Details for Eliminated Flowgate 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H2T557_SRT-L
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 50/50 36.21 MW 36.21 MW
315065 1CHESTF6 50/50 14.8 MW 14.8 MW
315083 1SPRUNCA 50/50 5.22 MW 5.22 MW
315084 1SPRUNCB 50/50 5.22 MW 5.22 MW
315131 1EDGECMA Adder 4.89 MW 4.16 MW
315611 6Z1-036WIND Adder 3.04 MW 2.58 MW
916042 Z1-036 E Adder 20.4 MW 17.34 MW
941032 AE2-094 E Adder 27.31 MW 23.21 MW
944012 AF1-069 E Adder 8.92 MW 7.58 MW
961942 AG1-037 E Adder 0.23 MW 0.19 MW
962332 AG1-082 E Adder 0.92 MW 0.79 MW
962342 AG1-083 E Adder 0.92 MW 0.79 MW
963041 AG1-153 C Adder 3.78 MW 3.22 MW
963042 AG1-153 E Adder 5.67 MW 4.82 MW
963611 AG1-210 C Adder 0.7 MW 0.59 MW
963612 AG1-210 E Adder 1.05 MW 0.89 MW
964112 AG1-272 E Adder 0.79 MW 0.67 MW
964122 AG1-273 E Adder 0.79 MW 0.67 MW
964132 AG1-274 E Adder 0.79 MW 0.67 MW
964801 AG1-343 C Adder 0.71 MW 0.6 MW
964802 AG1-343 E Adder 1.06 MW 0.9 MW
965192 AG1-384 E Adder 0.79 MW 0.67 MW
966661 AG1-536 C Adder 5.78 MW 4.91 MW
966662 AG1-536 E Adder 7.76 MW 6.6 MW
966872 AG1-558 E 50/50 3.67 MW 3.67 MW
966882 AG1-559 E Adder 1.69 MW 1.43 MW
315033 1BIRCHWDA Adder 5.83 MW 4.95 MW
961611 AG1-000B C Adder 5.75 MW 4.89 MW
316427 AG1-213 C Adder 0.56 MW 0.48 MW
940541 AE2-040 C Adder 2.47 MW 2.1 MW
940551 AE2-041 C 50/50 8.04 MW 8.04 MW
941281 AE2-122 C Adder 21.14 MW 17.97 MW
941282 AE2-122 E Adder 85.31 MW 72.51 MW
941591 AE2-156 C Adder 16.76 MW 14.25 MW
943471 AF1-018 C 50/50 8.04 MW 8.04 MW
944581 AF1-123 C Adder 33.41 MW 28.39 MW
944582 AF1-123 E Adder 76.5 MW 65.02 MW
944591 AF1-124 C Adder 33.52 MW 28.5 MW
944592 AF1-124 E Adder 76.77 MW 65.26 MW
944601 AF1-125 C Adder 32.89 MW 27.96 MW
944602 AF1-125 E Adder 75.3 MW 64.0 MW
944631 AF1-128 C 50/50 94.6 MW 94.6 MW
944641 AF1-129 C 50/50 128.61 MW 128.61 MW
957191 AF2-013 C Adder 8.28 MW 7.04 MW
961602 AG1-000A E Adder 3.8 MW 3.23 MW
961612 AG1-000B E 50/50 8.63 MW 8.63 MW
965741 AG1-442 C Adder 4.92 MW 4.18 MW
965751 AG1-443 C Adder 4.92 MW 4.18 MW
965761 AG1-444 C Adder 9.12 MW 7.75 MW
965811 AG1-449 C Adder 15.9 MW 13.51 MW
965831 AG1-451 C Adder 1.62 MW 1.38 MW
966871 AG1-558 C 50/50 0.4 MW 0.4 MW
966881 AG1-559 C Adder 0.18 MW 0.15 MW
316303 AF2-085 Adder 4.2 MW 3.57 MW
958502 AF2-144 E Adder 1.68 MW 1.43 MW
963622 AG1-213 E Adder 0.66 MW 0.56 MW
963623 AG1-213 BAT Adder 0.99 MW 0.84 MW

Light Load Potential Congestion due to Local Energy Deliverability

The following flowgates remain after considering the topology reinforcements required by the cycle.

Light Load Potential Congestion due to Local Energy Deliverability
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 170.37 678.68 B 1156.29 380.47

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 170.37 678.68 B 1156.29 380.47
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 170.29 678.68 B 1155.75 380.3
Topology Case Flowgate Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315605 6W1-029WIND 50/50 2.18 MW 2.18 MW
315611 6Z1-036WIND 50/50 3.98 MW 3.98 MW
901082 W1-029 E 50/50 14.6 MW 14.6 MW
916042 Z1-036 E 50/50 26.7 MW 26.7 MW
916192 Z1-068 E 50/50 0.48 MW 0.48 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
941281 AE2-122 C 50/50 16.36 MW 16.36 MW
941282 AE2-122 E 50/50 66.0 MW 66.0 MW
944581 AF1-123 C 50/50 115.23 MW 115.23 MW
944582 AF1-123 E 50/50 263.87 MW 263.87 MW
944591 AF1-124 C 50/50 115.64 MW 115.64 MW
944592 AF1-124 E 50/50 264.83 MW 264.83 MW
944601 AF1-125 C 50/50 113.46 MW 113.46 MW
944602 AF1-125 E 50/50 259.73 MW 259.73 MW
965741 AG1-442 C Adder 2.87 MW 2.44 MW
965751 AG1-443 C Adder 2.87 MW 2.44 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Light Load Potential Congestion due to Local Energy Deliverability
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
OP AC 124.21 678.68 B 842.96 38.11
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
OP AC 123.75 678.68 B 839.87 38.11
DVP 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer
314747 to 314744 ckt 1
DVP_P1-2: LN 2193_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2193_SRT-A'
 OPEN BRANCH FROM BUS 313707 TO BUS 313867 CKT 1   /*6FORK UNION  230.0 - 6BREMODIST   230.0
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BUS 313867                                   /*6BREMODIST   230.0
END
OP AC 124.97 307.38 B 384.13 17.45
DVP 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 101.66 661.76 B 672.73 34.55
DVP 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 100.38 661.76 B 664.26 34.55
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P1-2: LN 563_SRT-L-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-L-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 100.69 663.64 B 668.21 39.06

Details for 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
OP AC 124.21 678.68 B 842.96 38.11
Elimination
Base Case Details for Eliminated Flowgate 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 Adder 9.35 MW 7.95 MW
315065 1CHESTF6 Adder 4.04 MW 3.44 MW
315083 1SPRUNCA Adder 1.66 MW 1.41 MW
315084 1SPRUNCB Adder 1.66 MW 1.41 MW
315611 6Z1-036WIND Adder 1.1 MW 0.94 MW
916042 Z1-036 E Adder 7.41 MW 6.29 MW
941032 AE2-094 E Adder 12.55 MW 10.67 MW
944012 AF1-069 E Adder 4.1 MW 3.49 MW
961942 AG1-037 E Adder 0.1 MW 0.08 MW
962332 AG1-082 E Adder 0.39 MW 0.34 MW
962342 AG1-083 E Adder 0.39 MW 0.34 MW
963041 AG1-153 C Adder 1.82 MW 1.55 MW
963042 AG1-153 E Adder 2.74 MW 2.33 MW
964112 AG1-272 E 50/50 1.5 MW 1.5 MW
964122 AG1-273 E 50/50 1.5 MW 1.5 MW
964132 AG1-274 E 50/50 1.5 MW 1.5 MW
964801 AG1-343 C Adder 0.31 MW 0.26 MW
964802 AG1-343 E Adder 0.46 MW 0.39 MW
965192 AG1-384 E 50/50 1.5 MW 1.5 MW
966872 AG1-558 E Adder 0.65 MW 0.55 MW
961611 AG1-000B C Adder 1.74 MW 1.48 MW
940541 AE2-040 C Adder 0.97 MW 0.82 MW
940551 AE2-041 C Adder 2.1 MW 1.79 MW
941281 AE2-122 C Adder 7.25 MW 6.16 MW
941282 AE2-122 E Adder 29.25 MW 24.86 MW
941591 AE2-156 C Adder 5.71 MW 4.85 MW
943471 AF1-018 C Adder 2.1 MW 1.79 MW
943571 AF1-028 C Adder -15.97 MW -13.58 MW
944581 AF1-123 C Adder 11.54 MW 9.81 MW
944582 AF1-123 E Adder 26.43 MW 22.46 MW
944591 AF1-124 C Adder 11.58 MW 9.85 MW
944592 AF1-124 E Adder 26.53 MW 22.55 MW
944601 AF1-125 C Adder 11.36 MW 9.66 MW
944602 AF1-125 E Adder 26.02 MW 22.11 MW
944631 AF1-128 C Adder 24.43 MW 20.76 MW
944641 AF1-129 C Adder 35.13 MW 29.86 MW
961612 AG1-000B E Adder 2.61 MW 2.22 MW
965741 AG1-442 C Adder 1.95 MW 1.66 MW
965751 AG1-443 C Adder 1.95 MW 1.66 MW
965811 AG1-449 C Adder 7.69 MW 6.54 MW
965831 AG1-451 C 50/50 5.36 MW 5.36 MW
966871 AG1-558 C Adder 0.07 MW 0.06 MW
316303 AF2-085 50/50 2.08 MW 2.08 MW
958502 AF2-144 E Adder 3.12 MW 2.65 MW
966673 AG1-537 BT 50/50 8.97 MW 8.97 MW

Details for 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
OP AC 123.75 678.68 B 839.87 38.11
Elimination
Base Case Details for Eliminated Flowgate 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 Adder 9.35 MW 7.95 MW
315065 1CHESTF6 Adder 4.04 MW 3.44 MW
315083 1SPRUNCA Adder 1.66 MW 1.41 MW
315084 1SPRUNCB Adder 1.66 MW 1.41 MW
315611 6Z1-036WIND Adder 1.1 MW 0.94 MW
916042 Z1-036 E Adder 7.41 MW 6.29 MW
941032 AE2-094 E Adder 12.55 MW 10.67 MW
944012 AF1-069 E Adder 4.1 MW 3.49 MW
961942 AG1-037 E Adder 0.1 MW 0.08 MW
962332 AG1-082 E Adder 0.39 MW 0.34 MW
962342 AG1-083 E Adder 0.39 MW 0.34 MW
963041 AG1-153 C Adder 1.82 MW 1.55 MW
963042 AG1-153 E Adder 2.74 MW 2.33 MW
964112 AG1-272 E 50/50 1.5 MW 1.5 MW
964122 AG1-273 E 50/50 1.5 MW 1.5 MW
964132 AG1-274 E 50/50 1.5 MW 1.5 MW
964801 AG1-343 C Adder 0.31 MW 0.26 MW
964802 AG1-343 E Adder 0.46 MW 0.39 MW
965192 AG1-384 E 50/50 1.5 MW 1.5 MW
966872 AG1-558 E Adder 0.65 MW 0.55 MW
961611 AG1-000B C Adder 1.74 MW 1.48 MW
940541 AE2-040 C Adder 0.97 MW 0.82 MW
940551 AE2-041 C Adder 2.1 MW 1.79 MW
941281 AE2-122 C Adder 7.25 MW 6.16 MW
941282 AE2-122 E Adder 29.25 MW 24.86 MW
941591 AE2-156 C Adder 5.71 MW 4.85 MW
943471 AF1-018 C Adder 2.1 MW 1.79 MW
943571 AF1-028 C Adder -15.97 MW -13.58 MW
944581 AF1-123 C Adder 11.54 MW 9.81 MW
944582 AF1-123 E Adder 26.43 MW 22.46 MW
944591 AF1-124 C Adder 11.58 MW 9.85 MW
944592 AF1-124 E Adder 26.53 MW 22.55 MW
944601 AF1-125 C Adder 11.36 MW 9.66 MW
944602 AF1-125 E Adder 26.02 MW 22.11 MW
944631 AF1-128 C Adder 24.43 MW 20.76 MW
944641 AF1-129 C Adder 35.13 MW 29.86 MW
961612 AG1-000B E Adder 2.61 MW 2.22 MW
965741 AG1-442 C Adder 1.95 MW 1.66 MW
965751 AG1-443 C Adder 1.95 MW 1.66 MW
965811 AG1-449 C Adder 7.69 MW 6.54 MW
965831 AG1-451 C 50/50 5.36 MW 5.36 MW
966871 AG1-558 C Adder 0.07 MW 0.06 MW
316303 AF2-085 50/50 2.08 MW 2.08 MW
958502 AF2-144 E Adder 3.12 MW 2.65 MW
966673 AG1-537 BT 50/50 8.97 MW 8.97 MW

Details for 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 2193_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer
314747 to 314744 ckt 1
DVP_P1-2: LN 2193_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2193_SRT-A'
 OPEN BRANCH FROM BUS 313707 TO BUS 313867 CKT 1   /*6FORK UNION  230.0 - 6BREMODIST   230.0
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BUS 313867                                   /*6BREMODIST   230.0
END
OP AC 124.97 307.38 B 384.13 17.45
Elimination
Base Case Details for Eliminated Flowgate 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 2193_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
964112 AG1-272 E 50/50 0.88 MW 0.88 MW
964122 AG1-273 E 50/50 0.88 MW 0.88 MW
964132 AG1-274 E 50/50 0.88 MW 0.88 MW
965192 AG1-384 E 50/50 0.88 MW 0.88 MW
941281 AE2-122 C Adder 3.32 MW 2.82 MW
941282 AE2-122 E Adder 13.4 MW 11.39 MW
944581 AF1-123 C Adder 5.28 MW 4.49 MW
944582 AF1-123 E Adder 12.1 MW 10.29 MW
944591 AF1-124 C Adder 5.3 MW 4.51 MW
944592 AF1-124 E Adder 12.15 MW 10.32 MW
944601 AF1-125 C Adder 5.2 MW 4.42 MW
944602 AF1-125 E Adder 11.91 MW 10.12 MW
944641 AF1-129 C Adder 16.2 MW 13.77 MW
965831 AG1-451 C 50/50 3.23 MW 3.23 MW
316303 AF2-085 Adder 1.32 MW 1.12 MW
958502 AF2-144 E Adder 1.86 MW 1.58 MW

Details for 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 101.66 661.76 B 672.73 34.55
Elimination
Base Case Details for Eliminated Flowgate 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 Adder 3.4 MW 2.89 MW
315083 1SPRUNCA Adder 1.43 MW 1.22 MW
315084 1SPRUNCB Adder 1.43 MW 1.22 MW
315131 1EDGECMA Adder 2.35 MW 1.99 MW
315611 6Z1-036WIND Adder 1.03 MW 0.88 MW
916042 Z1-036 E Adder 6.92 MW 5.88 MW
941032 AE2-094 E Adder 13.1 MW 11.13 MW
944012 AF1-069 E Adder 4.28 MW 3.64 MW
961942 AG1-037 E Adder 0.1 MW 0.08 MW
962332 AG1-082 E Adder 0.39 MW 0.33 MW
962342 AG1-083 E Adder 0.39 MW 0.33 MW
963041 AG1-153 C Adder 1.91 MW 1.63 MW
963042 AG1-153 E Adder 2.87 MW 2.44 MW
964112 AG1-272 E 50/50 1.44 MW 1.44 MW
964122 AG1-273 E 50/50 1.44 MW 1.44 MW
964132 AG1-274 E 50/50 1.44 MW 1.44 MW
964801 AG1-343 C Adder 0.3 MW 0.26 MW
964802 AG1-343 E Adder 0.45 MW 0.38 MW
965192 AG1-384 E 50/50 1.44 MW 1.44 MW
966251 AG1-494 C Adder 1.21 MW 1.03 MW
966252 AG1-494 E Adder 1.82 MW 1.54 MW
940541 AE2-040 C Adder 0.94 MW 0.8 MW
941281 AE2-122 C Adder 6.56 MW 5.57 MW
941282 AE2-122 E Adder 26.45 MW 22.48 MW
941591 AE2-156 C Adder 5.14 MW 4.37 MW
943571 AF1-028 C Adder -11.39 MW -9.68 MW
944581 AF1-123 C Adder 10.46 MW 8.89 MW
944582 AF1-123 E Adder 23.96 MW 20.37 MW
944591 AF1-124 C Adder 10.5 MW 8.93 MW
944592 AF1-124 E Adder 24.05 MW 20.44 MW
944601 AF1-125 C Adder 10.3 MW 8.76 MW
944602 AF1-125 E Adder 23.59 MW 20.05 MW
944641 AF1-129 C Adder 29.6 MW 25.16 MW
961602 AG1-000A E Adder 1.82 MW 1.55 MW
965741 AG1-442 C Adder 1.89 MW 1.61 MW
965751 AG1-443 C Adder 1.89 MW 1.61 MW
965761 AG1-444 C Adder 4.16 MW 3.53 MW
965811 AG1-449 C Adder 8.0 MW 6.8 MW
965831 AG1-451 C 50/50 5.05 MW 5.05 MW
316303 AF2-085 50/50 2.02 MW 2.02 MW
958502 AF2-144 E Adder 2.92 MW 2.48 MW

Details for 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 100.38 661.76 B 664.26 34.55
Elimination
Base Case Details for Eliminated Flowgate 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 Adder 3.4 MW 2.89 MW
315083 1SPRUNCA Adder 1.43 MW 1.22 MW
315084 1SPRUNCB Adder 1.43 MW 1.22 MW
315131 1EDGECMA Adder 2.35 MW 1.99 MW
315611 6Z1-036WIND Adder 1.03 MW 0.88 MW
916042 Z1-036 E Adder 6.92 MW 5.88 MW
941032 AE2-094 E Adder 13.1 MW 11.13 MW
944012 AF1-069 E Adder 4.28 MW 3.64 MW
961942 AG1-037 E Adder 0.1 MW 0.08 MW
962332 AG1-082 E Adder 0.39 MW 0.33 MW
962342 AG1-083 E Adder 0.39 MW 0.33 MW
963041 AG1-153 C Adder 1.91 MW 1.63 MW
963042 AG1-153 E Adder 2.87 MW 2.44 MW
964112 AG1-272 E 50/50 1.44 MW 1.44 MW
964122 AG1-273 E 50/50 1.44 MW 1.44 MW
964132 AG1-274 E 50/50 1.44 MW 1.44 MW
964801 AG1-343 C Adder 0.3 MW 0.26 MW
964802 AG1-343 E Adder 0.45 MW 0.38 MW
965192 AG1-384 E 50/50 1.44 MW 1.44 MW
966251 AG1-494 C Adder 1.21 MW 1.03 MW
966252 AG1-494 E Adder 1.82 MW 1.54 MW
940541 AE2-040 C Adder 0.94 MW 0.8 MW
941281 AE2-122 C Adder 6.56 MW 5.57 MW
941282 AE2-122 E Adder 26.45 MW 22.48 MW
941591 AE2-156 C Adder 5.14 MW 4.37 MW
943571 AF1-028 C Adder -11.39 MW -9.68 MW
944581 AF1-123 C Adder 10.46 MW 8.89 MW
944582 AF1-123 E Adder 23.96 MW 20.37 MW
944591 AF1-124 C Adder 10.5 MW 8.93 MW
944592 AF1-124 E Adder 24.05 MW 20.44 MW
944601 AF1-125 C Adder 10.3 MW 8.76 MW
944602 AF1-125 E Adder 23.59 MW 20.05 MW
944641 AF1-129 C Adder 29.6 MW 25.16 MW
961602 AG1-000A E Adder 1.82 MW 1.55 MW
965741 AG1-442 C Adder 1.89 MW 1.61 MW
965751 AG1-443 C Adder 1.89 MW 1.61 MW
965761 AG1-444 C Adder 4.16 MW 3.53 MW
965811 AG1-449 C Adder 8.0 MW 6.8 MW
965831 AG1-451 C 50/50 5.05 MW 5.05 MW
316303 AF2-085 50/50 2.02 MW 2.02 MW
958502 AF2-144 E Adder 2.92 MW 2.48 MW

Details for 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-L-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P1-2: LN 563_SRT-L-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-L-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 100.69 663.64 B 668.21 39.06
Elimination
Base Case Details for Eliminated Flowgate 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-L-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 50/50 15.65 MW 15.65 MW
315131 1EDGECMA Adder 2.56 MW 2.17 MW
315611 6Z1-036WIND Adder 1.2 MW 1.02 MW
916042 Z1-036 E Adder 8.04 MW 6.83 MW
941032 AE2-094 E Adder 14.54 MW 12.36 MW
944012 AF1-069 E Adder 4.75 MW 4.04 MW
961942 AG1-037 E Adder 0.11 MW 0.09 MW
962332 AG1-082 E Adder 0.43 MW 0.37 MW
962342 AG1-083 E Adder 0.43 MW 0.37 MW
963041 AG1-153 C Adder 2.0 MW 1.7 MW
963042 AG1-153 E Adder 3.01 MW 2.56 MW
964801 AG1-343 C Adder 0.33 MW 0.28 MW
964802 AG1-343 E Adder 0.5 MW 0.42 MW
961611 AG1-000B C Adder 2.51 MW 2.13 MW
940541 AE2-040 C 50/50 1.65 MW 1.65 MW
941281 AE2-122 C Adder 7.68 MW 6.53 MW
941282 AE2-122 E Adder 30.99 MW 26.34 MW
941591 AE2-156 C Adder 6.11 MW 5.19 MW
944581 AF1-123 C Adder 11.83 MW 10.05 MW
944582 AF1-123 E Adder 27.09 MW 23.02 MW
944591 AF1-124 C Adder 11.87 MW 10.09 MW
944592 AF1-124 E Adder 27.19 MW 23.11 MW
944601 AF1-125 C Adder 11.65 MW 9.9 MW
944602 AF1-125 E Adder 26.66 MW 22.66 MW
944641 AF1-129 C 50/50 136.07 MW 136.07 MW
961602 AG1-000A E Adder 1.99 MW 1.69 MW
961612 AG1-000B E Adder 3.76 MW 3.2 MW
965741 AG1-442 C Adder 2.18 MW 1.86 MW
965751 AG1-443 C Adder 2.18 MW 1.86 MW
965761 AG1-444 C Adder 4.57 MW 3.88 MW
965811 AG1-449 C Adder 8.42 MW 7.15 MW

Short Circuit Analysis

Short Circuit Analysis is complete and requires a cost allocation for this project.

Bus Name

Project Contributor

Project ID

Breaker Overdutied

Breaker Capacity (Amps)

Duty Percent With All TC1 Online

Duty Percent Without TC1 Studied Project

Duty Percent Difference (%)

Duty Amps With All TC1 Online

Duty Amps Without TC1 Studied Project

Duty Amps Difference (Amps)

Full Amps Contribution

Contribution %

Cost Allocated

Yadkin 2&4 230kV

2

AF1-124

210512

40000

101.97%

100.03%

1.93%

40786

40012.1

773.90

773.9

34.0%

$510,511

 

Reinforcement ID: n6588

Reinforcement project: Replace 230kV Breaker 210512 at Yadkin 230kV with a 63 kA breaker

Total cost: $1,500,000

Period: 42-48 months

AF1-124 total cost allocated: $510,511

 

Stability Analysis

Analysis Complete - Issues Found

Executive Summary

New Service Requests (projects) in PJM Transition Cycle 1 Cluster 29 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 29 projects.

 

Table 1: Transition Cycle 1 Cluster 29 Projects

 

Cluster

Project

Fuel Type

Transmission Owner

MFO (MW)

MWE (MW)

MWC (MW)

Point of Interconnection

29

AF1-123

Wind

Dominion

833

833

253.2

Harper 230 kV

AF1-124

Wind

Dominion

836

836

254.1

Harper 230 kV

AF1-125

Wind

Dominion

820

820

249.3

Harper 230 kV

 

This analysis is effectively a screening study to determine whether the addition of the Cluster 29 projects will meet the dynamics requirements of the NERC, Dominion Energy, and PJM reliability standards.

 

The load flow scenario for the analysis was based on the Regional Transmission Expansion Plan (RTEP) 2027 summer peak case, modified to include applicable projects. Cluster 29 projects have been dispatched online at maximum power output with near unity power factor measured at the high-side of the main substation transformer.

 

Cluster 29 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. 124 contingencies were studied, each with a 20 second simulation time period. The studied contingencies included:

  • Steady-state operation (30 seconds)
  • Three-phase faults with normal clearing time
  • Single-phase bus faults with normal clearing time
  • Single-phase faults with stuck breaker
  • Single-phase faults with delayed clearing at remote end
  • Single-phase faults with loss of multiple-circuit tower line.

 

For all simulations, the projects under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance.

 

The results of the analysis were evaluated against the following recovery criteria per PJM’s Regional Transmission Planning Process and Transmission Owner criteria:

 

  • Cluster 29 projects were able to ride through the faults (except for faults where protective action trips a generator(s)).
  • The system with Cluster 29 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.
  • Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus) and the final voltages are within the steady-state voltage ranges below per Dominion Energy’s transmission planning criteria.
    • P1 Category Contingencies:
      • 0.93 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.93 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.01 to 1.096 p.u. for 500 kV facilities
    • P2, P4, P5, and P7 Category Contingencies:
      • 0.90 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.90 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.00 to 1.096 p.u. for 500 kV facilities
  • No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

AF1-123, AF1-124 and AF1-125 were observed to diverge. It was discovered that the dynamic models supplied for the power plant controller (PPC) PLNTBU1 were modeled at the Harpers 230 kV POI for all three queue projects. PSS/E disregard two PPCs as duplicates. Therefore, one PPC was attempting to control 2903.97 MVA with a base of 973.5 MVA. Modifications to Cluster 29 projects dynamic models to allowed the generators to converge.

  1. AF1-123
    1. PLNTBU1 ICON (M) (Bus number for voltage control) set to 946798
    2. ICON (M+1) (FROM bus number of the monitored branch) set to 946798
    3. ICON (M+2) (TO bus number of the monitored branch) set to 314963

 

  1. AF1-124
    1. PLNTBU1 ICON (M) (Bus number for voltage control) set to 946808
    2. ICON (M+1) (FROM bus number of the monitored branch) set to 946808
    3. ICON (M+2) (TO bus number of the monitored branch) set to 314963

 

  1. AF1-125
    1. PLNTBU1 ICON (M) (Bus number for voltage control) set to 946818
    2. ICON (M+1) (FROM bus number of the monitored branch) set to 946818
    3. ICON (M+2) (TO bus number of the monitored branch) set to 314963

 

The results of the analysis identified the addition of the Cluster 29 queue projects resulted in instability for an outage of the updated Fentress to Yadkins 500 kV circuit 588. Mitigation is required to connect Cluster 29 queue projects to resolve this instability. An additional 500 kV line from Updated Fentress 500 kV to Yadkin 500 kV mitigated the instability by allowing for an outlet to Yadkin’s to remain when the other circuit was lost. Dominion Energy provided details on the location and parameters that connect this line at Yadkins and Fentress. The EMT analysis performed for Cluster 29 confirms the additional needed outlet.

 

The results of the analysis identified the addition of the Cluster 29 queue projects resulted in instability after the modification to the impedances for the three (3) lines from Harpers to Fentress, using the planned impedances, for the contingencies listed in report. Mitigation is required to connect Cluster 29 queue projects to resolve this instability. Two (2) gas-insulated lines (GILs) between existing Fentress 230 kV and New Fentress 235 kV (represented as a zero-impedance branch because of the short physical distance), stable operation was observed for outages resulting in weak system conditions. Additionally, P4 contingencies at the Fentress 500 and 230 kV, Yadkin 230 and 500 kV, and Harpers 230 kV will require a generator station clearing time to maintain stability. The P4 delayed clearing time needed to be at 14 cycles at 230 kV and 13.5 cycles at 500 kV. The P5 contingencies at Fentress 230 kV substation required dual plot protection be installed to eliminate the delayed clearing for the outage to maintain stability.

 

Additionally, the Composite Short Circuit Ratio (CSCR)  was less than 3 for an outage of the  updated Fentress  to Yadkin 500 kV circuit 588 transmission line prior to the mitigation.

 

Additionally, the AF1-123, AF1-124 and AF1-125 queue projects exhibited slow active power recovery after the fault was cleared and this is recovery was expected based on the model documentation provided for the OEMs’ wind turbine. The WGOWECC controller, clamps the active power at 95% for up to 5 seconds to ensure steady recovery of the system and then releases the active power to 100% to restore full operation.

 

Additionally, the AF1-123, AF1-124 and AF1-125 queue projects exhibited oscillations during the faults for some contingencies. These oscillations were resolved after the fault was cleared and did not cause any recovery concerns. This can be examined further in the EMT analysis to determine the response after fault clearing incase this needs tuned.

 

The parameters are not consistent across all STATCOM’s and reactive recovery should be coordinated in future model submissions.

 

CVOW should work with SGRE to review the observed tripping of WTG’s (Protection Trip) under peak load conditions for the following P6 scenario an outage of one of the Yadkin – Fentress 500 kV Circuits followed by an outage of one of the Fentress – Harpers 230 kV Circuits.   Under Light Loading Conditions CVOW remained Stable however a Protection Trip was observed for peak loading conditions for the same scenario. This appears to a “model” issue which may require the tunning of the SGRE WTG’s to mitigate.  CVOW and SGRE should evaluate this operating condition and provide a response back to PJM and Dominion. 

 

Lastly, for post fault oscillations a user defined model is recommended for lower SCR values less than 3.

 

AE2-156 reactive power and terminal voltage recovery was not settling to a steady state value during the analysis. However, it was observed that reactive settling doesn’t violate PJM or Dominion’s criteria. The models were tuned to achieve a faster recovery in Cluster 46 Stability analysis.

 

AE2-051 reactive power and terminal voltage recovery was not settling to a steady state value during the analysis. However, it was observed that reactive settling doesn’t violate any PJM or Dominion criteria . The models can be tuned to achieve a faster recovery upon request.

 

AE2-313 reactive power and terminal voltage recovery was not settling to a steady state value during the analysis. However, it was observed that reactive settling doesn’t violate any PJM or Dominion criteria . The models can be tuned to achieve a recovery upon request.

 

AB2-169 generator tripped for overvoltages above 1.25 p.u. The unit rode through when the pickup timer  was increased from 0.0 seconds to 0.0125 seconds.

 

AE2-051, AE2-156, and AE2-313 responses were not caused by the addition of the Cluster 29 queue projects. Cluster 29 queue projects were GNET and a sample of contingencies were simulated. Reactive and terminal voltage responses remain that same.  

 

Dominion energy as an Interconnection Transmission Owner had performed EMT (PSCAD) analysis. Addition to the need for a second Yadkin to Fentress 500 kV Line they also identified a need for two 230 kV GIS bus ties. This reinforcement will be tested during phase 3.

 

Note:

 

The stability study results in this report may need some parameter changes. Analysis will be revisited during phase III SIS of Transition Cycle #1 to reflect the impacts of any parameter modifications. The high level findings indicate that the scope of the system reinforcement is not expected to change with the parameter modifications.

 

 

 

 

Reactive Power Analysis

The reactive power capability of Cluster 29 met the 0.95 leading and lagging power factor requirement measured at the point of interconnection (POI) Harper 230 kV substation.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project ID Project Name Status
AA1-139 Hickory-Shawboro 230kV In Service
AA1-145 Four Rivers 230kV In Service
AA2-088 Boykins-Handsome 115kV In Service
AA2-178 Mackeys 230kV In Service
AB1-027 Old Church 34.5 KV In Service
AB2-022 Elizabeth City 34.5kV In Service
AB2-024 Correctional 34.5kV In Service
AB2-025 Sapony 34.5kV In Service
AB2-026 Powhatan 34.5kV In Service
AB2-100 Clubhouse-Lakeview 230kV In Service
AB2-134 Hopewell-Surry 230kV In Service
AB2-161 Waverly #2 DP 115kV In Service
AB2-190 Hopewell-Surry 230kV In Service
AC1-027 Pendleton 34.5kV In Service
AC1-065 Harmony Village-Shackleford 115kV Under Construction
AC1-112 Old Church 34.5kV In Service
AC1-118 Westmoreland 34.5kV In Service
AC1-147 Grassfield 34.5kV In Service
AC1-161 Septa 500kV In Service
AC1-164 Chickahominy 230kV Suspended
AC1-191 Elmont 115kV Suspended
AC1-216 Hopewell-Surry 230kV In Service
AC2-012 Grassfield-Great Bridge 115kV In Service
AC2-079 Ivor-Oak Ridge 115kV Suspended
AC2-137 Elko 34.5kV In Service
AC2-138 Northern Neck 34.5kV In Service
AC2-141 Septa 500kV Engineering & Procurement
AD1-022 Cashie-Trowbridge 230 kV Engineering & Procurement
AD1-025 Hopewell-Surry 230 kV Engineering & Procurement
AD1-033 Fentress-Landstown 230 kV In Service
AD1-041 Harmony Village-Shackleford 115 kV In Service
AD1-063 Harmony Village 34.5 kV In Service
AD1-074 Trowbridge 230 kV Engineering & Procurement
AD1-075 Trowbridge 230 kV Engineering & Procurement
AD1-076 Trowbridge 230 kV Engineering & Procurement
AD1-082 Bakers Pond-Ivor 115kV In Service
AD1-105 Kings Dominion DP 115 kV Under Construction
AD1-144 Kings Fork 34.5 kV In Service
AD1-151 Hopewell-Surry 230 kV Suspended
AD2-030 Wan 34.5 kV In Service
AD2-073 Sanders DP 230 kV In Service
AD2-074 Garner DP-Lancaster 115 kV Suspended
AD2-085 Myrtle-Windsor DP 115kV Engineering & Procurement
AE1-072 Shawboro-Sligo 230 kV Engineering & Procurement
AE1-074 Winterpock 34.5 kV Suspended
AE1-075 Powhatan 34.5 kV Partially in Service - Under Construction
AE1-103 Holland-Union Camp 115 kV Engineering & Procurement
AE1-149 Disputanta-Poe 115 kV Suspended
AE1-155 Garner-Northern Neck 115 kV Partially in Service - Under Construction
AE1-162 Smithfield 34.5 kV In Service
AE1-175 Light Foot 34.5 kV In Service
AE1-190 Harmony Village-Shackleford 115 kV Under Construction
AE1-191 Harmony Village-Shackleford 115 kV Under Construction
AE2-027 Harrowgate-Locks 115kV Suspended
AE2-033 Clubhouse-Sapony 230 kV Suspended
AE2-034 Mackeys 230 kV Partially in Service - Under Construction
AE2-040 Sapony 34.5 kV Suspended
AE2-041 Harmony Village 230 kV Suspended
AE2-104 Suffolk 115 kV Suspended
AE2-122 Birdneck-Landstown 230 kV Active
AE2-147 Swamp 230 kV Active
AE2-156 Yadkin 115 kV Active
AE2-212 Harrowgate 34 kV Engineering & Procurement
AE2-227 Iron Bridge 34 kV Withdrawn
AE2-228 Tyler 34 kv Withdrawn
AE2-231 St. Johns 115 kV Active
AE2-247 Myrtle-Windsor 115 kV Engineering & Procurement
AE2-250 Purdy Sw.-Reams 115 kV Active
AE2-253 Hickory-Moyock 230 kV In Service
AF1-017 Myrtle-Windsor 115 kV Engineering & Procurement
AF1-018 Harmony Village 230 kV Suspended
AF1-032 Suffolk 34.5 kV In Service
AF1-042 Garner DP-Lancaster 115 kV Suspended
AF1-114 Oak Grove-Dahlgren 230 kV Suspended
AF1-123 Oceana 230 kV Active
AF1-125 Oceana 230 kV Active
AF1-128 Chesterfield 230 kV Active
AF1-129 Chesterfield 230 kV Engineering & Procurement
AF1-152 Swamp 230 kV Active
AF1-291 Tyler 34.5 kV Engineering & Procurement
AF2-013 Arnold's Corner-Dahlgren 230 kV Active
AF2-035 St. Johns 115 kV Active
AF2-043 Suffolk 34.5 kV In Service
AF2-046 Tunis-Mapleton 115 kV Active
AF2-054 Wan 34.5 kV Engineering & Procurement
AF2-077 White Marsh 34.5 kV In Service
AF2-081 Moyock 230 kV Active
AF2-091 Oak Grove-Dahlgren 230 kV Active
AF2-110 Suffolk 115 kV Suspended
AF2-120 Garner-Northern Neck 115 kV Active
AF2-144 Powhatan 34.5 kV In Service
AF2-300 St. Johns 115 kV Active
AG1-008 Tunis-Mapleton 115 kV Active
AG1-038 Garner DP-Lancaster 115 kV Active
AG1-075 Purdy-Sapony 115 kV Active
AG1-135 Garner-Lancaster 115 kV Active
AG1-145 Lightfoot 34.5 kV In Service
AG1-146 Garner DP-Lancaster 115 kV Active
AG1-147 Garner DP-Lancaster 115 kV Active
AG1-171 Hopewell-Surry 230kV Active
AG1-172 Hopewell-Surry 230 kV Active
AG1-173 Hopewell-Surry 230 kV Active
AG1-210 Northern Neck 34.5 kV Engineering & Procurement
AG1-213 St Johns 13.2 kV Withdrawn
AG1-282 Dunnsville 34.5 kV Engineering & Procurement
AG1-343 Boykins-Murphy 115 kV Active
AG1-393 Fort Pickett DP 34.5 kV Active
AG1-394 Boykins 34.5 kV Active
AG1-437 Cashie-Earleys 230 kV Active
AG1-438 Cashie-Earleys 230 kV Active
AG1-442 Cashie-Earleys 230 kV Active
AG1-443 Cashie-Earleys 230 kV Active
AG1-536 Garner-Northern Neck 115 kV Active
AG1-558 Buckner 34.5 kV Engineering & Procurement
AG1-559 Caroline Pines 22 kV Engineering & Procurement
V4-068 Murphy's 34.5kV In Service
W1-029 Winfall 230kV In Service
Y1-086 Morgans Corner In Service
Z1-036 WinFall-Chowan 230kV Partially in Service - Under Construction
Z1-068 Birdneck 34.5kV In Service
Z2-027 Pasquotank 34.5kV In Service

Affected Systems

In Phase II of the Cycle, PJM provides the Affected System Operator any updates on the PJM projects that require an Affected Systems Study based on their response at DP1. New Service Requests that require an Affected Systems Study are required to enter into an Affected Systems Study Agreement with the Affected System Operator, as applicable, prior to the close of DP2 or they will be withdrawn from the Cycle.

If the Project Developer already entered into the necessary agreement and the results are available, PJM will supply them in the Phase II SIS report. See below for the status of any required Affected Systems Study. A status of “Pending” means that the study is not yet completed by the Affected System Operator. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Midcontinent Independent System Operator (MISO) Not required
New York Independent System Operator (NYISO) Not required
Tennessee Valley Authority (TVA) Not required
Louisville Gas & Electric (LG&E) Not required
Duke Energy Carolinas (DUKE) Not required
Duke Energy Progress – East (CPLE) Not required
Duke Energy Progress – West (CPLW) Not required

System Reinforcements

Based on the Phase II analysis results, this project has potential cost responsibility for the following System Reinforcements:

AF1-124 System Reinforcements Cost Breakdown:
Type TO RTEP ID / TO ID Title MW Impact Percent Allocation Allocated Cost ($USD)
Stability Dominion n8492 Construct a 13.5 Mile long 2nd Yadkin - Fentress 500 kV Line 836.0 MW 33.6% $27,844,275
Stability Dominion n9259 / (Pending) Need for Two 230 kV GIS Bus ties for CVOW 836.0 MW 33.6% $10,076,336
Stability Dominion n8492.1 Breaker Addition at Fentress Substation 836.0 MW 33.6% $5,709,924
Stability Dominion n8492.2 Expansion of Yadkin Substation to Accommodate the 500 kV Line 836.0 MW 33.6% $5,709,924
Short Circuit Dominion n6588 / TC1-PH2-DOM-034 Replace 230kV Breaker 210512 at Yadkin 230kV with a 63 kA breaker 773.9 MW 34.0% $510,511
Load Flow Dominion n9251 / TC1-PH2-DOM-019 Construct new 62.03 mile line between North Anna and Possum Point with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at North Anna and Possum Point to accommodate new line. 171.2 MW 21.5% $70,944,198
Load Flow Dominion n9191 / TC1-PH1-DOM-090 Wreck and rebuild 41.13 miles of Line 576 between North Anna and Midlothian with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA 169.7 MW 11.9% $26,696,065
Load Flow Dominion n9248 / TC1-PH2-DOM-042 Construct new 41.13 mile line between North Anna and Midlothian with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at North Anna and Midlothian to accommodate new line. 169.7 MW 11.9% $25,547,160
Load Flow Dominion n9139 / TC1-PH1-DOM-073 Wreck and rebuild 37.26 miles of LN 563 between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA 362.6 MW 12.5% $25,487,644
Load Flow Dominion n9249 / TC1-PH2-DOM-043 Construct new 37.26 mile line between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Midlothian and Carson to accommodate new line. 362.6 MW 12.5% $24,311,292
Load Flow Dominion n9140 / TC1-PH1-DOM-071 Construct new 14.02 mile line between Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Spotsylvania and North Anna to accommodate new line. 41.1 MW 9.8% $12,881,339
Load Flow Dominion n9246 / TC1-PH2-DOM-040 Wreck and rebuild 18.75 miles of Line 594 btwn Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA 50.5 MW 12.2% $12,844,715
Load Flow Dominion n9137 / TC1-PH1-DOM-069 Construct new 18.75 mile line between Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Morrisville and Spotsylvania to accommodate new line. 50.5 MW 12.2% $11,908,186
Load Flow Dominion n9153 / TC1-PH1-DOM-043 Wreck and rebuild 5.9 miles of 230 kV line 2128 between Fentress and Thrasher with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C as a double circuit. Replace Line Leads at both ends. 380.5 MW 33.6% $11,461,761
Load Flow Dominion n9158 / TC1-PH1-DOM-089 Expand Morrisville 500 kV substation and relocate line #545 and line #569 120.6 MW 28.3% $9,534,814
Load Flow Dominion n9247 / TC1-PH2-DOM-041 Wreck and rebuild 14.02 miles of Line 573 btwn Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA. 41.1 MW 9.8% $9,351,807
Load Flow Dominion n9261 / TC1-PH2-DOM-060 Replace existing 230/500 kV Transformer #1 at Chickahominy with a larger device (3*480 MVA) with transformer ratings of 1440/1440/1440 MVA. 91.3 MW 24.2% $9,176,148
Load Flow Dominion n9207 / TC1-PH2-DOM-018 Replace 6ELMONT 230 KV to 8ELMONT 500 KV ckt 1 with Larger XFRM. (3-480 MVA Single Phase XFRM) 109.5 MW 23.0% $10,363,095
Load Flow Dominion n9203 / TC1-PH2-DOM-008 Wreck and rebuild 10.86 miles of line 2028 between Fork Union and Cunningham (Grape Vine) with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C 34.5 MW 14.4% $4,493,803
Load Flow Dominion n9112 / TC1-PH2-DOM-063 Wreck and Rebuild 12.4 miles of 230 kV line 259 with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C and replace line lead at Chesterfield. 15.2 MW 11.0% $3,309,085
Load Flow Dominion n7569 / dom-490 Reconductor 6.51 miles of line between Mt. Eagle and Cunningham with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @250 degrees C 34.5 MW 14.4% $2,693,799
Load Flow Dominion n7568 / dom-369 Wreck and rebuild 6.47 miles of line 2028 between Charlottesville and Mt. Eagle with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C and replace line lead at Mt. Eagle 34.5 MW 14.1% $2,630,162
Load Flow Dominion n9199 / TC1-PH2-DOM-004 Wreck and rebuild 1.63 miles of line 2193 between Fork Union and Bremo replace line lead at Bremo 76.2 MW 14.6% $699,504
Load Flow Dominion n6161 / dom-039 Replace 500 kV circuit breaker H1T561 at Clifton with a higher rated device (Clifton - Ox). 97.9 MW 26.9% $568,131
Load Flow Dominion n9198 / TC1-PH2-DOM-003 Replace Circuit Breaker and Circuit Breaker Lead at Bremo 230 kV (Bremo - Fork Union). 76.2 MW 27.8% $374,587
Load Flow Dominion n9157 / TC1-PH1-DOM-047 Replace Wave Trap at Fentress and Thrasher 230 kV (Fentress - Thrasher). 380.5 MW 33.6% $134,350
Load Flow Dominion n9264 / TC1-PH2-DOM-066 Replace wave trap and line lead at Surry 500 kV substation (Surry - Chickahominy) 251.2 MW 21.0% $70,970
Load Flow Dominion n9156 / TC1-PH1-DOM-045 Replace CT Relay at Fentress. (Fentress - Thrasher) 380.5 MW 33.6% $50,381
Load Flow Dominion n9131 / TC1-PH1-DOM-097 Substation work to energize the temporary Bremo transformer #7 which is not in service. 17.4 MW 30.5% $25,694
Load Flow Dominion n9266 / TC1-PH2-DOM-065 Replace CBSW at Basin 230 kV (Basin - Chesterfield B). 15.2 MW 11.0% $25,455
Load Flow Dominion n9265 / TC1-PH2-DOM-064 Replace 230 kV wave trap at Basin 230 kV (Basin - Chesterfield B). 15.2 MW 11.0% $18,512
Grand Total: $325,453,627
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Stability Dominion n8492 Construct a 13.5 Mile long 2nd Yadkin - Fentress 500 kV Line $82,900,000 $27,844,275 30 to 36 Months

Contributor

Description: Construct one (1) overhead 500kV transmission line that will start at the existing Fentress 500 kV Substation and terminate at the existing Yadkin 500 kV Substation, located approximately 13.7 miles away.

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 833.0 MW 33.5% $27,744,355
AF1-124 836.0 MW 33.6% $27,844,275
AF1-125 820.0 MW 32.9% $27,311,370
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Stability Dominion n9259 / (Pending) Need for Two 230 kV GIS Bus ties for CVOW $30,000,000 $10,076,336 24 to 30 Months

Contributor

Description: Need for two 230 kV GIS Bus Ties for Costal Virginia Offshore Wind Project.

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 833.0 MW 33.5% $10,040,177
AF1-124 836.0 MW 33.6% $10,076,336
AF1-125 820.0 MW 32.9% $9,883,487
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Stability Dominion n8492.1 Breaker Addition at Fentress Substation $17,000,000 $5,709,924 30 to 36 Months

Contributor

Description: Install Two 5000 amp GIS Breakers at Fentress Substation .

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 833.0 MW 33.5% $5,689,434
AF1-124 836.0 MW 33.6% $5,709,924
AF1-125 820.0 MW 32.9% $5,600,643
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Stability Dominion n8492.2 Expansion of Yadkin Substation to Accommodate the 500 kV Line $17,000,000 $5,709,924 30 to 36 Months

Contributor

Description: Expansion of yadkins 500 kV switchyard to accommodate the new 500 kV line which includes addition of 5000 amp GIS breakers and relocation of the existing suffolk -yadkin 500 kV line#565

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 833.0 MW 33.5% $5,689,434
AF1-124 836.0 MW 33.6% $5,709,924
AF1-125 820.0 MW 32.9% $5,600,643
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Short Circuit Dominion n6588 / TC1-PH2-DOM-034 Replace 230kV Breaker 210512 at Yadkin 230kV with a 63 kA breaker $1,500,000 $510,511 Dec 01 2028

Contributor

Description: Replace 230kV Breaker 210512 at Yadkin 230kV with a 63 kA breaker

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 757.3 MW 33.3% $499,560
AF1-124 773.9 MW 34.0% $510,511
AF1-125 742.7 MW 32.7% $489,929
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9251 / TC1-PH2-DOM-019 Construct new 62.03 mile line between North Anna and Possum Point with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at North Anna and Possum Point to accommodate new line. $390,789,000 $70,944,198 48 to 60 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Description: Construct new 62.03 mile line between North Anna and Possum Point with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at North Anna and Possum Point to accommodate new line. New Rating = 4356/4356/5009 MVA

Flowgates Addressed by this Reinforcement
Facility Contingency
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (All) A 4356.0 MVA
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (All) B 4356.0 MVA
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (All) C 5009.0 MVA
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (All) A 4356.0 MVA
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (All) B 4356.0 MVA
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (All) C 5009.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
62.6 MW 7.9% $25,951,524
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
170.5 MW 21.4% $70,690,515
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
171.2 MW 21.5% $70,944,198
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
167.9 MW 21.1% $69,589,978
AF2-037 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
28.5 MW 3.6% $11,805,794
AF2-042 89.5 MW 11.3% $37,119,795
AF2-063 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
45.4 MW 5.7% $18,838,866
AG1-305 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
19.1 MW 2.4% $7,912,257
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
40.5 MW 5.1% $16,804,842
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9191 / TC1-PH1-DOM-090 Wreck and rebuild 41.13 miles of Line 576 between North Anna and Midlothian with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA $266,474,110 $26,696,065 48 to 60 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Description: Wreck and rebuild 41.13 miles of Line 576 between North Anna and Midlothian with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA

Flowgates Addressed by this Reinforcement
Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line DVP_P4-2: 57602_SRT-S
6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer DVP_P1-2: LN 576_SRT-A
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line DVP_P1-2: LN 576_SRT-A
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line (All) A 4356.0 MVA
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line (All) B 4356.0 MVA
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line (All) C 5009.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
89.0 MW 6.2% $14,007,488
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
135.6 MW 9.5% $21,329,945
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
169.1 MW 11.8% $26,601,498
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
169.7 MW 11.9% $26,696,065
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
166.5 MW 11.7% $26,191,915
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
29.7 MW 2.1% $4,669,215
AF2-042 191.1 MW 13.4% $30,062,419
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
55.7 MW 3.9% $8,763,944
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
55.7 MW 3.9% $8,763,944
AG1-075 40.4 MW 2.8% $6,361,361
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
36.1 MW 2.5% $5,682,552
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
36.1 MW 2.5% $5,682,552
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
81.0 MW 5.7% $12,739,873
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
21.1 MW 1.5% $3,314,900
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
21.1 MW 1.5% $3,314,900
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
43.2 MW 3.0% $6,794,547
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
87.8 MW 6.1% $13,812,374
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9248 / TC1-PH2-DOM-042 Construct new 41.13 mile line between North Anna and Midlothian with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at North Anna and Midlothian to accommodate new line. $255,006,000 $25,547,160 48 to 60 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Description: Construct new 41.13 mile line between North Anna and Midlothian with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at North Anna and Midlothian to accommodate new line. New Rating = 4356/4356/5009 MVA

Flowgates Addressed by this Reinforcement
Facility Contingency
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line (Any)
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line DVP_P1-2: LN 576_SRT-A
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line DVP_P4-2: 57602_SRT-S
6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer DVP_P1-2: LN 576_SRT-A
New Ratings
Facility Rating Set Rating Type Rating Value
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line (All) A 4356.0 MVA
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line (All) B 4356.0 MVA
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line (All) C 5009.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
89.0 MW 6.2% $13,404,655
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
135.6 MW 9.5% $20,411,979
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
169.1 MW 11.8% $25,456,663
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
169.7 MW 11.9% $25,547,160
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
166.5 MW 11.7% $25,064,707
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
29.7 MW 2.1% $4,468,269
AF2-042 191.1 MW 13.4% $28,768,638
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
55.7 MW 3.9% $8,386,775
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
55.7 MW 3.9% $8,386,775
AG1-075 40.4 MW 2.8% $6,087,590
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
36.1 MW 2.5% $5,437,995
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
36.1 MW 2.5% $5,437,995
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
81.0 MW 5.7% $12,191,594
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
21.1 MW 1.5% $3,172,239
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
21.1 MW 1.5% $3,172,239
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
43.2 MW 3.0% $6,502,133
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
87.8 MW 6.1% $13,217,938
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9139 / TC1-PH1-DOM-073 Wreck and rebuild 37.26 miles of LN 563 between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA $242,190,000 $25,487,644 48 to 60 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Description: Wreck and rebuild 37.26 miles of Line 563 between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA

Flowgates Addressed by this Reinforcement
Facility Contingency
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line (Any)
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line DVP_P1-2: LN 563_SRT-S-1
6CARSON-8CARSON 230.0/500.0 kV Ckt 2 transformer DVP_P4-2: 56372_SRT-S
New Ratings
Facility Rating Set Rating Type Rating Value
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line (All) A 4356.0 MVA
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line (All) B 4356.0 MVA
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line (All) C 5009.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
40.1 MW 1.4% $2,816,410
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
438.8 MW 15.1% $30,841,818
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
361.3 MW 12.4% $25,396,403
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
362.6 MW 12.5% $25,487,644
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
355.7 MW 12.2% $25,001,138
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
13.4 MW 0.5% $938,780
AF2-042 584.2 MW 20.1% $41,066,329
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
87.2 MW 3.0% $6,129,660
AF2-222 34.1 MW 1.2% $2,397,175
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
87.2 MW 3.0% $6,129,660
AG1-153 17.5 MW 0.6% $1,230,571
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
53.7 MW 1.8% $3,778,106
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
53.7 MW 1.8% $3,778,106
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
134.0 MW 4.6% $9,420,767
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
22.2 MW 0.8% $1,558,916
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
22.2 MW 0.8% $1,558,916
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
56.3 MW 1.9% $3,955,880
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
182.3 MW 6.3% $12,817,877
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9249 / TC1-PH2-DOM-043 Construct new 37.26 mile line between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Midlothian and Carson to accommodate new line. $231,012,000 $24,311,292 48 to 60 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Description: Construct new 37.26 mile line between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Midlothian and Carson to accommodate new line. New Rating = 4356/4356/5009 MVA

Flowgates Addressed by this Reinforcement
Facility Contingency
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line (Any)
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line DVP_P1-2: LN 563_SRT-S-1
6CARSON-8CARSON 230.0/500.0 kV Ckt 2 transformer DVP_P4-2: 56372_SRT-S
New Ratings
Facility Rating Set Rating Type Rating Value
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line (All) A 4356.0 MVA
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line (All) B 4356.0 MVA
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line (All) C 5009.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
40.1 MW 1.4% $2,686,422
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
438.8 MW 15.1% $29,418,349
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
361.3 MW 12.4% $24,224,261
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
362.6 MW 12.5% $24,311,292
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
355.7 MW 12.2% $23,847,239
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
13.4 MW 0.5% $895,452
AF2-042 584.2 MW 20.1% $39,170,960
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
87.2 MW 3.0% $5,846,752
AF2-222 34.1 MW 1.2% $2,286,536
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
87.2 MW 3.0% $5,846,752
AG1-153 17.5 MW 0.6% $1,173,776
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
53.7 MW 1.8% $3,603,732
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
53.7 MW 1.8% $3,603,732
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
134.0 MW 4.6% $8,985,962
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
22.2 MW 0.8% $1,486,966
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
22.2 MW 0.8% $1,486,966
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
56.3 MW 1.9% $3,773,301
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
182.3 MW 6.3% $12,226,283
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9140 / TC1-PH1-DOM-071 Construct new 14.02 mile line between Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Spotsylvania and North Anna to accommodate new line. $156,268,121 $12,881,339 48 to 60 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Description: Construct new 14.02 mile line between Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Spotsylvania and North Anna to accommodate new line. New Rating = 4356/4356/5009 MVA

Flowgates Addressed by this Reinforcement
Facility Contingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line (All) A 4295.0 MVA
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line (All) B 4357.0 MVA
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line (All) C 4996.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
37.1 MW 8.8% $11,639,262
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
40.9 MW 9.7% $12,835,848
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
41.1 MW 9.8% $12,881,339
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
40.3 MW 9.6% $12,637,881
AF2-037 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
24.1 MW 5.7% $7,567,920
AF2-042 53.0 MW 12.6% $16,616,357
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
16.9 MW 4.0% $5,293,968
AF2-063 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
38.5 MW 9.2% $12,076,609
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
16.9 MW 4.0% $5,293,968
AG1-305 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
16.2 MW 3.8% $5,072,157
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
10.9 MW 2.6% $3,421,596
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
10.9 MW 2.6% $3,421,596
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
24.0 MW 5.7% $7,523,056
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.4 MW 1.5% $1,995,983
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.4 MW 1.5% $1,995,983
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
12.8 MW 3.0% $4,012,359
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
24.0 MW 5.7% $7,537,174
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9246 / TC1-PH2-DOM-040 Wreck and rebuild 18.75 miles of Line 594 btwn Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA $125,300,705 $12,844,715 48 to 60 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Description: Wreck and rebuild 18.75 miles of Line 594 between Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA

Flowgates Addressed by this Reinforcement
Facility Contingency
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line (All) A 4356.0 MVA
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line (All) B 4356.0 MVA
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line (All) C 5009.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
37.4 MW 9.0% $9,526,641
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
50.3 MW 12.1% $12,799,158
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
50.5 MW 12.2% $12,844,715
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
49.5 MW 11.9% $12,601,911
AF2-037 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
14.4 MW 3.5% $3,656,320
AF2-042 54.2 MW 13.0% $13,787,683
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
16.5 MW 4.0% $4,205,557
AF2-063 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
22.9 MW 5.5% $5,834,689
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
16.5 MW 4.0% $4,205,557
AG1-305 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
9.6 MW 2.3% $2,450,697
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
10.7 MW 2.6% $2,717,171
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
10.7 MW 2.6% $2,717,171
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
23.1 MW 5.6% $5,878,211
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.2 MW 1.5% $1,585,101
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.2 MW 1.5% $1,585,101
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
12.3 MW 3.0% $3,135,080
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
24.2 MW 5.8% $6,169,118
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9137 / TC1-PH1-DOM-069 Construct new 18.75 mile line between Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Morrisville and Spotsylvania to accommodate new line. $116,164,820 $11,908,186 48 to 60 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Description: Construct new 18.75 mile line between Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Morrisville and Spotsylvania to accommodate new line. New Rating = 4356/4356/5009 MVA

Flowgates Addressed by this Reinforcement
Facility Contingency
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line (All) A 4295.0 MVA
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line (All) B 4357.0 MVA
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line (All) C 4996.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
37.4 MW 9.0% $8,832,038
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
50.3 MW 12.1% $11,865,950
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
50.5 MW 12.2% $11,908,186
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
49.5 MW 11.9% $11,683,084
AF2-037 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
14.4 MW 3.5% $3,389,732
AF2-042 54.2 MW 13.0% $12,782,399
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
16.5 MW 4.0% $3,898,923
AF2-063 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
22.9 MW 5.5% $5,409,272
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
16.5 MW 4.0% $3,898,923
AG1-305 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
9.6 MW 2.3% $2,272,012
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
10.7 MW 2.6% $2,519,057
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
10.7 MW 2.6% $2,519,057
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
23.1 MW 5.6% $5,449,621
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.2 MW 1.5% $1,469,529
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.2 MW 1.5% $1,469,529
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
12.3 MW 3.0% $2,906,496
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
24.2 MW 5.8% $5,719,317
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9153 / TC1-PH1-DOM-043 Wreck and rebuild 5.9 miles of 230 kV line 2128 between Fentress and Thrasher with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C as a double circuit. Replace Line Leads at both ends. $34,125,000 $11,461,761 42 to 48 Months

Contributor

Description: Wreck and rebuild 5.9 miles of 230 kV line 2128 between Fentress and Thrasher with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C as a double circuit. Replace Line Leads at both Fentress and Thrasher.

Flowgates Addressed by this Reinforcement
Facility Contingency
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (All) A 956.0 MVA
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (All) B 1052.0 MVA
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (All) C 1339.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
379.1 MW 33.5% $11,420,790
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
380.5 MW 33.6% $11,461,761
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
373.2 MW 32.9% $11,242,449
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9158 / TC1-PH1-DOM-089 Expand Morrisville 500 kV substation and relocate line #545 and line #569 $40,000,000 $9,534,814 36 to 40 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Expand Morrisville 500 kV substation and relocate line #545 and line #569

Flowgates Addressed by this Reinforcement
Facility Contingency
8BRISTER-8OX 500.0 kV Ckt 1 line DVP_P4-2: 541T569_SRT-S
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
120.1 MW 28.2% $9,500,571
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
120.6 MW 28.3% $9,534,814
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
118.3 MW 27.7% $9,352,290
AF2-037 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
20.7 MW 4.9% $1,639,709
AF2-063 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
33.1 MW 7.8% $2,616,465
AG1-305 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
13.9 MW 3.3% $1,098,939
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9247 / TC1-PH2-DOM-041 Wreck and rebuild 14.02 miles of Line 573 btwn Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA. $113,450,107 $9,351,807 48 to 60 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Description: Wreck and rebuild 14.02 miles of Line 573 between Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA

Flowgates Addressed by this Reinforcement
Facility Contingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line (All) A 4356.0 MVA
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line (All) B 4356.0 MVA
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line (All) C 5009.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
37.1 MW 8.8% $8,450,063
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
40.9 MW 9.7% $9,318,780
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
41.1 MW 9.8% $9,351,807
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
40.3 MW 9.6% $9,175,057
AF2-037 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
24.1 MW 5.7% $5,494,284
AF2-042 53.0 MW 12.6% $12,063,417
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
16.9 MW 4.0% $3,843,402
AF2-063 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
38.5 MW 9.2% $8,767,576
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
16.9 MW 4.0% $3,843,402
AG1-305 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
16.2 MW 3.8% $3,682,368
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
10.9 MW 2.6% $2,484,067
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
10.9 MW 2.6% $2,484,067
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
24.0 MW 5.7% $5,461,712
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.4 MW 1.5% $1,449,077
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.4 MW 1.5% $1,449,077
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
12.8 MW 3.0% $2,912,959
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
24.0 MW 5.7% $5,471,962
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9261 / TC1-PH2-DOM-060 Replace existing 230/500 kV Transformer #1 at Chickahominy with a larger device (3*480 MVA) with transformer ratings of 1440/1440/1440 MVA. $45,000,000 $9,176,148 42 to 44 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Replace existing 230/500 kV Transformer #1 at Chickahominy with a larger device (3*480 MVA) with transformer ratings of 1440/1440/1440 MVA.

Flowgates Addressed by this Reinforcement
Facility Contingency
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer (All) A 1440.0 MVA
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer (All) B 1440.0 MVA
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer (All) C 1440.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
15.7 MW 4.2% $1,581,610
AE2-156 11.2 MW 3.0% $1,120,236
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
91.0 MW 24.1% $9,143,200
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
91.3 MW 24.2% $9,176,148
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
89.6 MW 23.7% $9,000,559
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
5.2 MW 1.4% $527,170
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
11.8 MW 3.1% $1,184,223
AG1-075 16.9 MW 4.5% $1,698,033
AG1-135 11.4 MW 3.0% $1,149,367
AG1-146 AG1-146 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-146, AG1-147
5.8 MW 1.5% $584,226
AG1-147 AG1-146 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-146, AG1-147
13.6 MW 3.6% $1,363,328
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
14.3 MW 3.8% $1,432,539
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9207 / TC1-PH2-DOM-018 Replace 6ELMONT 230 KV to 8ELMONT 500 KV ckt 1 with Larger XFRM. (3-480 MVA Single Phase XFRM) $45,000,000 $10,363,095 42 to 44 Months

Contributor

Description: Replace 6ELMONT 230 KV to 8ELMONT 500 KV ckt 1 with Larger XFRM. (3-480 MVA Single Phase XFRM)

Flowgates Addressed by this Reinforcement
Facility Contingency
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer (All) A 1440.0 MVA
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer (All) B 1440.0 MVA
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer (All) C 1440.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
19.0 MW 4.0% $1,798,361
AE2-156 13.4 MW 2.8% $1,270,244
AE2-250 15.3 MW 3.2% $1,451,424
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
109.1 MW 22.9% $10,325,913
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
109.5 MW 23.0% $10,363,095
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
107.4 MW 22.6% $10,164,791
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
6.3 MW 1.3% $599,454
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
9.9 MW 2.1% $939,012
AG1-075 27.9 MW 5.9% $2,638,883
AG1-146 AG1-146 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-146, AG1-147
4.9 MW 1.0% $466,715
AG1-147 AG1-146 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-146, AG1-147
11.5 MW 2.4% $1,088,875
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.6 MW 1.4% $626,512
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
6.6 MW 1.4% $626,512
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
15.9 MW 3.3% $1,504,311
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
12.0 MW 2.5% $1,135,897
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9203 / TC1-PH2-DOM-008 Wreck and rebuild 10.86 miles of line 2028 between Fork Union and Cunningham (Grape Vine) with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C $31,222,500 $4,493,803 42 to 48 Months

Contributor

Description: Wreck and rebuild 10.86 miles of line 2028 between Fork Union and Cunningham (Grape Vine) with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C

Flowgates Addressed by this Reinforcement
Facility Contingency
6CUNNING-6FORK UNION 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6CUNNING-6FORK UNION 230.0 kV Ckt 1 line (All) A 1174.0 MVA
6CUNNING-6FORK UNION 230.0 kV Ckt 1 line (All) B 1195.0 MVA
6CUNNING-6FORK UNION 230.0 kV Ckt 1 line (All) C 1360.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.4 MW 14.3% $4,478,195
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.5 MW 14.4% $4,493,803
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
33.9 MW 14.1% $4,407,959
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
6.2 MW 2.6% $804,983
AF1-323 AF1-323 138kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-323, AF2-302, AG1-022
10.8 MW 4.5% $1,404,850
AF2-042 18.2 MW 7.6% $2,362,271
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
3.8 MW 1.6% $490,872
AF2-171 22.6 MW 9.4% $2,933,003
AF2-222 20.6 MW 8.6% $2,677,682
AF2-302 AF1-323 138kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-323, AF2-302, AG1-022
3.9 MW 1.6% $510,902
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
3.0 MW 1.3% $392,671
AG1-022 AF1-323 138kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-323, AF2-302, AG1-022
3.9 MW 1.6% $510,902
AG1-098 13.4 MW 5.6% $1,749,006
AG1-285 11.8 MW 4.9% $1,539,469
AG1-427 11.0 MW 4.6% $1,425,400
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
8.0 MW 3.3% $1,040,533
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9112 / TC1-PH2-DOM-063 Wreck and Rebuild 12.4 miles of 230 kV line 259 with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C and replace line lead at Chesterfield. $35,750,000 $3,309,085 42 to 48 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Wreck and Rebuild 12.4 miles of 230 kV line 259 with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C and replace line lead at Chesterfield.

Flowgates Addressed by this Reinforcement
Facility Contingency
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (All) A 797.0 MVA
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (All) B 797.0 MVA
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (All) C 1115.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
5.6 MW 4.0% $1,221,182
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
13.3 MW 9.6% $2,893,949
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
15.1 MW 10.9% $3,297,299
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
15.2 MW 11.0% $3,309,085
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
14.9 MW 10.8% $3,246,662
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
1.9 MW 1.3% $407,061
AF2-042 17.8 MW 12.8% $3,874,605
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
6.2 MW 4.5% $1,348,211
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
6.2 MW 4.5% $1,348,211
AG1-075 8.2 MW 5.9% $1,792,158
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
3.8 MW 2.8% $829,836
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
3.8 MW 2.8% $829,836
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
8.7 MW 6.3% $1,902,599
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
2.2 MW 1.6% $484,107
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
2.2 MW 1.6% $484,107
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
4.6 MW 3.4% $1,014,705
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
8.6 MW 6.2% $1,874,006
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n7569 / dom-490 Reconductor 6.51 miles of line between Mt. Eagle and Cunningham with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @250 degrees C $18,716,250 $2,693,799 36 to 40 Months

Contributor

Description: Reconductor 6.51 miles of line between Mt. Eagle and Cunningham with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @250 degrees C

Flowgates Addressed by this Reinforcement
Facility Contingency
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line (All) A 1315.0 MVA
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line (All) B 1435.0 MVA
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line (All) C 1745.0 MVA
6CUNNING-AF2-397 TP 230.0 kV Ckt 1 line (All) A 1315.0 MVA
6CUNNING-AF2-397 TP 230.0 kV Ckt 1 line (All) B 1435.0 MVA
6CUNNING-AF2-397 TP 230.0 kV Ckt 1 line (All) C 1745.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.4 MW 14.3% $2,684,443
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.5 MW 14.4% $2,693,799
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
33.9 MW 14.1% $2,642,340
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
6.2 MW 2.6% $482,545
AF1-323 AF1-323 138kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-323, AF2-302, AG1-022
10.8 MW 4.5% $842,134
AF2-042 18.2 MW 7.6% $1,416,057
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
3.8 MW 1.6% $294,252
AF2-171 22.6 MW 9.4% $1,758,181
AF2-222 20.6 MW 8.6% $1,605,130
AF2-302 AF1-323 138kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-323, AF2-302, AG1-022
3.9 MW 1.6% $306,259
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
3.0 MW 1.3% $235,386
AG1-022 AF1-323 138kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-323, AF2-302, AG1-022
3.9 MW 1.6% $306,259
AG1-098 13.4 MW 5.6% $1,048,437
AG1-285 11.8 MW 4.9% $922,831
AG1-427 11.0 MW 4.6% $854,453
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
8.0 MW 3.3% $623,745
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n7568 / dom-369 Wreck and rebuild 6.47 miles of line 2028 between Charlottesville and Mt. Eagle with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C and replace line lead at Mt. Eagle $18,701,250 $2,630,162 36 to 40 Months

Contributor

Description: Wreck and rebuild 6.47 miles of line 2028 between Charlottesville and Mt. Eagle with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C and replace line lead at Mt. Eagle

Flowgates Addressed by this Reinforcement
Facility Contingency
6CHARLVL-6MTEAGLE 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6CHARLVL-6MTEAGLE 230.0 kV Ckt 1 line (All) A 781.0 MVA
6CHARLVL-6MTEAGLE 230.0 kV Ckt 1 line (All) B 869.0 MVA
6CHARLVL-6MTEAGLE 230.0 kV Ckt 1 line (All) C 909.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.4 MW 14.0% $2,621,027
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.5 MW 14.1% $2,630,162
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
33.9 MW 13.8% $2,579,919
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
6.3 MW 2.6% $481,422
AF1-323 AF1-323 138kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-323, AF2-302, AG1-022
10.9 MW 4.4% $827,188
AF2-042 21.0 MW 8.5% $1,596,063
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
3.9 MW 1.6% $293,543
AF2-171 23.0 MW 9.4% $1,754,101
AF2-222 21.2 MW 8.6% $1,611,440
AF2-302 AF1-323 138kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-323, AF2-302, AG1-022
4.0 MW 1.6% $300,775
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
3.1 MW 1.3% $234,849
AG1-022 AF1-323 138kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-323, AF2-302, AG1-022
4.0 MW 1.6% $300,775
AG1-098 13.9 MW 5.6% $1,056,556
AG1-285 12.3 MW 5.0% $936,429
AG1-427 11.4 MW 4.6% $867,991
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
8.0 MW 3.3% $609,010
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9199 / TC1-PH2-DOM-004 Wreck and rebuild 1.63 miles of line 2193 between Fork Union and Bremo replace line lead at Bremo $4,786,250 $699,504 36 to 42 Months

Contributor

Description: Wreck and rebuild 1.63 miles of line 2193 between Fork Union and Bremo with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C and replace line lead at Bremo

Flowgates Addressed by this Reinforcement
Facility Contingency
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line (Any)
6BREMODIST-6BREMO 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line LL A 781.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line LL B 869.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line LL C 909.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line SUM A 781.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line SUM B 869.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line SUM C 909.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line LL A 781.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line LL B 869.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line LL C 909.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line SUM A 781.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line SUM B 869.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line SUM C 909.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
75.9 MW 14.6% $696,934
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
76.2 MW 14.6% $699,504
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
74.8 MW 14.3% $686,105
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
13.8 MW 2.6% $126,777
AF2-042 40.9 MW 7.8% $375,283
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
8.4 MW 1.6% $77,311
AF2-171 50.3 MW 9.7% $461,882
AF2-222 45.9 MW 8.8% $421,226
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
6.7 MW 1.3% $61,838
AG1-098 30.1 MW 5.8% $275,947
AG1-285 26.3 MW 5.1% $241,752
AG1-427 24.4 MW 4.7% $223,782
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
15.4 MW 2.9% $141,149
AG1-451 14.4 MW 2.8% $132,118
AG1-537 17.9 MW 3.4% $164,643
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n6161 / dom-039 Replace 500 kV circuit breaker H1T561 at Clifton with a higher rated device (Clifton - Ox). $2,500,000 $568,131 Dec 31 2029

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Replace 500 kV circuit breaker H1T561 at Clifton with a higher rated device (Clifton - Ox).

Flowgates Addressed by this Reinforcement
Facility Contingency
8CLIFTON-8OX 500.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
8CLIFTON-8OX 500.0 kV Ckt 1 line (All) A 2857.0 MVA
8CLIFTON-8OX 500.0 kV Ckt 1 line (All) B 3117.0 MVA
8CLIFTON-8OX 500.0 kV Ckt 1 line (All) C 3793.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
19.2 MW 5.3% $111,332
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
97.6 MW 26.8% $566,095
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
97.9 MW 26.9% $568,131
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
96.0 MW 26.4% $557,259
AF2-037 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
12.3 MW 3.4% $71,653
AF2-063 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
19.7 MW 5.4% $114,338
AG1-305 AF2-037 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-037, AF2-063, AG1-305, AH1-012
8.3 MW 2.3% $48,022
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
12.4 MW 3.4% $72,094
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9198 / TC1-PH2-DOM-003 Replace Circuit Breaker and Circuit Breaker Lead at Bremo 230 kV (Bremo - Fork Union). $1,600,000 $374,587 42 to 48 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Replace Circuit Breaker and Circuit Breaker Lead at Bremo 230 kV (Bremo - Fork Union).

Flowgates Addressed by this Reinforcement
Facility Contingency
6BREMODIST-6BREMO 230.0 kV Ckt 1 line (Any)
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line LL A 876.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line LL B 956.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line LL C 1163.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line SUM A 876.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line SUM B 956.0 MVA
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line SUM C 1163.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line LL A 876.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line LL B 956.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line LL C 1163.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line SUM A 876.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line SUM B 956.0 MVA
6BREMODIST-6BREMO 230.0 kV Ckt 1 line SUM C 1163.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
75.9 MW 27.7% $373,211
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
76.2 MW 27.8% $374,587
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
74.8 MW 27.2% $367,412
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
15.4 MW 5.6% $75,586
AG1-451 14.4 MW 5.2% $70,750
AG1-537 17.9 MW 6.5% $88,167
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9157 / TC1-PH1-DOM-047 Replace Wave Trap at Fentress and Thrasher 230 kV (Fentress - Thrasher). $400,000 $134,350 16 to 18 Months

Contributor

Description: Replace Wave Trap at Fentress and Thrasher 230 kV (Fentress - Thrasher).

Flowgates Addressed by this Reinforcement
Facility Contingency
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (All) A 1572.0 MVA
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (All) B 1572.0 MVA
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (All) C 1808.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
379.1 MW 33.5% $133,870
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
380.5 MW 33.6% $134,350
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
373.2 MW 32.9% $131,780
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9264 / TC1-PH2-DOM-066 Replace wave trap and line lead at Surry 500 kV substation (Surry - Chickahominy) $400,000 $70,970 16 to 18 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Replace wave trap and line lead at Surry 500 kV substation (Surry - Chickahominy)

Flowgates Addressed by this Reinforcement
Facility Contingency
8CHCKAHM-8SURRY 500.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
8CHCKAHM-8SURRY 500.0 kV Ckt 1 line (All) A 2598.0 MVA
8CHCKAHM-8SURRY 500.0 kV Ckt 1 line (All) B 2858.0 MVA
8CHCKAHM-8SURRY 500.0 kV Ckt 1 line (All) C 3637.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
40.2 MW 3.4% $11,358
AE2-156 28.2 MW 2.4% $7,979
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
74.7 MW 6.3% $21,111
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
250.3 MW 21.0% $70,715
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
251.2 MW 21.0% $70,970
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
246.4 MW 20.6% $69,612
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
13.4 MW 1.1% $3,786
AF2-042 101.0 MW 8.5% $28,544
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
29.4 MW 2.5% $8,301
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
29.4 MW 2.5% $8,301
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
22.3 MW 1.9% $6,294
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
22.3 MW 1.9% $6,294
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
26.7 MW 2.2% $7,536
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
7.8 MW 0.7% $2,203
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
7.8 MW 0.7% $2,203
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
14.2 MW 1.2% $4,019
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
29.0 MW 2.4% $8,202
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9156 / TC1-PH1-DOM-045 Replace CT Relay at Fentress. (Fentress - Thrasher) $150,000 $50,381 12 to 18 Months

Contributor

Description: Repalce CT Relay at Fentress.

Flowgates Addressed by this Reinforcement
Facility Contingency
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (All) A 1195.0 MVA
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (All) B 1195.0 MVA
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (All) C 1673.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
379.1 MW 33.5% $50,201
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
380.5 MW 33.6% $50,381
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
373.2 MW 32.9% $49,417
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9131 / TC1-PH1-DOM-097 Substation work to energize the temporary Bremo transformer #7 which is not in service. $100,000 $25,694 6 to 12 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: There is a Temporary transformer at Bremo substation which is not in service. The cost is to energizing the temporary transformer #7 Ratings are 290/290/332 MVA.

Flowgates Addressed by this Reinforcement
Facility Contingency
3BREMO-6BREMO 115.0/230.0 kV Ckt 1 transformer (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
3BREMO-6BREMO 115.0/230.0 kV Ckt 1 transformer (All) A 290.0 MVA
3BREMO-6BREMO 115.0/230.0 kV Ckt 1 transformer (All) B 290.0 MVA
3BREMO-6BREMO 115.0/230.0 kV Ckt 1 transformer (All) C 332.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
17.4 MW 30.4% $25,606
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
17.4 MW 30.5% $25,694
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
17.1 MW 29.9% $25,208
AG1-537 5.3 MW 9.3% $7,848
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9266 / TC1-PH2-DOM-065 Replace CBSW at Basin 230 kV (Basin - Chesterfield B). $275,000 $25,455 12 to 18 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Replace CBSW at Basin 230 kV (Basin - Chesterfield B).

Flowgates Addressed by this Reinforcement
Facility Contingency
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (All) A 1174.0 MVA
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (All) B 1302.0 MVA
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (All) C 1360.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
5.6 MW 4.0% $9,394
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
13.3 MW 9.6% $22,261
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
15.1 MW 10.9% $25,364
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
15.2 MW 11.0% $25,455
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
14.9 MW 10.8% $24,974
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
1.9 MW 1.3% $3,131
AF2-042 17.8 MW 12.8% $29,805
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
6.2 MW 4.5% $10,371
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
6.2 MW 4.5% $10,371
AG1-075 8.2 MW 5.9% $13,786
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
3.8 MW 2.8% $6,383
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
3.8 MW 2.8% $6,383
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
8.7 MW 6.3% $14,635
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
2.2 MW 1.6% $3,724
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
2.2 MW 1.6% $3,724
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
4.6 MW 3.4% $7,805
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
8.6 MW 6.2% $14,415
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow Dominion n9265 / TC1-PH2-DOM-064 Replace 230 kV wave trap at Basin 230 kV (Basin - Chesterfield B). $200,000 $18,512 16 to 18 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Replace 230 kV wave trap at Basin 230 kV (Basin - Chesterfield B).

Flowgates Addressed by this Reinforcement
Facility Contingency
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (All) A 876.0 MVA
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (All) B 956.0 MVA
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (All) C 1163.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-147 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
5.6 MW 4.0% $6,832
AE2-313 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
13.3 MW 9.6% $16,190
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
15.1 MW 10.9% $18,446
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
15.2 MW 11.0% $18,512
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
14.9 MW 10.8% $18,163
AF1-152 Swamp 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-147, AF1-152
1.9 MW 1.3% $2,277
AF2-042 17.8 MW 12.8% $21,676
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
6.2 MW 4.5% $7,542
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
6.2 MW 4.5% $7,542
AG1-075 8.2 MW 5.9% $10,026
AG1-437 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
3.8 MW 2.8% $4,642
AG1-438 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
3.8 MW 2.8% $4,642
AG1-439 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
8.7 MW 6.3% $10,644
AG1-442 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
2.2 MW 1.6% $2,708
AG1-443 AG1-437 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-437, AG1-438, AG1-442, AG1-443
2.2 MW 1.6% $2,708
AG1-444 Chinquapin 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-439, AG1-444
4.6 MW 3.4% $5,677
AG1-449 AE2-313 500 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-313, AG1-449
8.6 MW 6.2% $10,484

Attachments


[1]Winter load flow analysis will be performed starting in Transition Cycle #2.