AF2-200 Phase II Study Report

v1.00 released 2024-12-18 13:43

Nelson-Electric Junction 345 kV

120.0 MW Capacity / 200.0 MW Energy

Introduction

This Phase II System Impact Study Report (PH2) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 310 for New Service Requests (projects) in Transition Cycle #1. The Project Developer/Eligible Customer (developer) is Steward Creek Solar, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Commonwealth Edison Company.

Preface

The Phase II System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase II System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.5, PJM takes the following actions during the Phase II System Impact Study:
  1. PJM will retool load flow results from Phase I System Impact Study (summer peak, winter peak[1] and light load) based on decisions made by Project Developers or Eligible Customers during Decision Point I.
  2. PJM will conduct any required voltage analyses.
  3. PJM will perform short circuit and stability analyses as required.
  4. PJM will coordinate with the Affected System to confirm which projects in PJM Cycle will require Affected System studies. If the Affected System Operator indicates that an Affected System study is required, PJM will:
    1. Notify the Project Developer or Eligible Customer of the need for an Affected System study and the requirement to execute an Affected System study agreement with the impacted Affected System Operator, and;
    2. Include the results of the Affected System Operator’s Affected System Study in the Phase II System Impact Study results, if applicable and available
  5. The Phase II System Impact Study Results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase II System Impact Study:
  1. Verify Interconnection Facilities and Network Upgrades required to accommodate the New Service Request.
  2. Perform a Facilities Study. The Facilities Study in Phase II System Impact Study phase will be for the physical Interconnection Facilities. The Facilities Study requirements are outlined in Attachment C of PJM Manual 14H. The study will be conducted pursuant to Tariff, Part VII, Subpart D, section 307(A)(7).

Decision Point II Requirements

At the close of Phase II System Impact Study, PJM will initiate Decision Point II (DP2). During DP2, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.A. Additional information on these elements is available in PJM Manual 14H sections 4.6, 6, and 7.

Allowable project modifications at Decision Point II are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

Adverse Test Eligibility

This New Service Request does not meet the Adverse Study Impact Criteria and has the option to either move forward in the Cycle process or withdraw at DP2 with Readiness Deposit #1 forfeited. See adverse study impact calculation below.

This section details whether a Project Developer or Eligible Customer qualifies for the Adverse Study Impact clause outlined in the PJM OATT, Part VII, Subpart D, section 311.B and Manual 14H, section 6.2.2. In order to qualify for an Adverse Study Impact at Decision Point II, the Network Upgrade cost from Phase I to Phase II must:

  1. Increase overall by 25% or more
  2. Increases by more than $10,000 per MW (Includes Costs identified in Affected System studies)

If a New Service Request meets the criteria above and chooses to withdraw the request, PJM will refund the cumulative Readiness Deposit amounts paid at the Application Phase and at Decision Point I (RD1 and RD2, respectively).

The below calculations show the computation of this New Service Request's Adverse Study Impact

DP2 Adverse Eligibility = DP2 Adverse Cost Alloc DP1 Adverse Cost Alloc > 1.25 AND ( DP2 Adverse Cost Alloc - DP1 Adverse Cost Alloc ) Project Size > $10,000 per MW
DP2 Adverse Eligibility = $29,427,387 $44,977,757 = 0.65 AND ( $29,427,387 - $44,977,757 ) 200.0 = $-77,752 per MW

General

The Project Developer has proposed an uprate to a planned/existing Solar facility located in the Commonwealth Edison Company zone — Lee County, Illinois. This project is an increase to the developer’s AF2-041/AF2-199 project(s), which will share the same Point of Interconnection. The AF2-200 project is a 200.0 MW uprate (120.0 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 600.0 MW with 360.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number AF2-200
Project Name Nelson-Electric Junction 345 kV
Project Developer Name Steward Creek Solar, LLC
State Illinois
County Lee
Transmission Owner Commonwealth Edison Company
MFO 600.0 MW
MWE 200.0 MW
MWC 120.0 MW
Fuel Type Solar
Basecase Study Year 2027

Physical Interconnection Facility Study

Received

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AF2-200 will interconnect with the ComEd transmission system as an uprate to AF2-041 via a newly constructed 345kV breaker and a half substation, TSS 934 Herman Road, tapping the TSS 155 Nelson – TSS 111 Electric Junction 345kV line, L.15502, approximately 32.5 miles from TSS 155 Nelson and 40.6 miles from TSS 111 Electric Junction.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In Phase II SIS, the interconnected Transmission Owner has performed a facilities study for both the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades. The System Reliability Network Upgrade shown in the table are planning level cost estimates which are subject to change as a result of a facility study performed by the TO during Phase III System Impact Study.

Based on the Phase II SIS results, the AF2-200 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit #3 are also shown below.

Cost Summary
Description Cost Allocated to AF2-200 Cost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF) $503,569 $0
Other Scope $0 $0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades $12,754,832 $12,754,832
Network Upgrades $5,069,205 $5,069,205
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL) $11,603,349 $11,603,349
Transient Stability $0 $0
Short Circuit $0 $0
Transmission Owner Analysis
SubRegional $0 $0
Distribution $0 $0
Affected System Study Reinforcements $0 $0
Total $29,930,956 $29,427,387

* Contributes to calculation for Readiness Deposit #3 (RD3). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Note 4: Please see the ‘Affected Systems Studies’ section of this Phase 2 SIS report for details on your project’s need for an Affected Systems Study. If your project requires an Affected Systems Study, the Affected Systems impacts may not be available from the Affected System Operator at the time of the PJM Phase II SIS. Therefore, the cost in this section would not reflect any required upgrades by the Affected System until the study is completed. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 311 (Decision Point II) A.1.b and PJM Manual 14H, section 6.2, Readiness Deposit #3 (RD3) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point II (DP2), the Project Developer or Eligible Customer is required to submit Readiness Deposit #3, which is calculated as 20% of cost allocation for required Phase II Network Upgrades minus Readiness Deposit #1 & Readiness Deposit #2.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Note 4: Readiness Deposit #3 can be zero, but may not be a negative number.

Readiness Deposit #3 Due for Project AF2-200

Readiness Deposit #3 has been calculated for the AF2-200 project based on the Phase II System Impact Study results and is shown in the table below. This Readiness Deposit #3 must be provided at Decision Point II through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID 20% of cost allocation for Phase II Network Upgrades Sum of Readiness Deposit #1 & Readiness Deposit #2 Received (RD1+RD2) Readiness Deposit #3 (RD3) for AF2-200 Project due at DP2
A B A - B
AF2-200 $5,885,477 $4,497,775 $1,387,702

Note: Failure to provide an acceptable form of Readiness Deposit #3 by the end of Decision Point II will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

As shown in the one line diagram, this Interconnection Request is sharing the Point of Interconnection (POI) with one or more other Interconnection Requests. Should other requests withdraw from Transition Cycle 1, the cost allocation for Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and applicable Network Upgrades identified in the study report will be updated for the remaining project(s). Refer to the one line for other Interconnection Requests at this POI.

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Build Option
Network Upgrades
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
(Pending)

Distribution Aux Power (3 miles)

$1,237,965 $741,069 $159,305 $43,872 $2,182,211 $727,404 (See Note 1)
(Pending)

Fiber Installation

$2,834,536 $1,432,732 $364,757 $84,820 $4,716,845 $1,572,282 (See Note 1)
(Pending)

4 Remote Ends - ICON Nodes at STA 6 Byron, TSS 144 Wayne, TSS 937 Lee County and TSS 113 Waterman

$265,891 $48,746 $89,871 $2,906 $407,414 $135,805 (See Note 1)
(Pending)

TSS155 Electric Junction - Remote End Relay Upgrades

$531,071 $122,825 $68,340 $7,271 $729,507 $243,169 (See Note 1)
(Pending)

TSS120 Electric Junction - Remote End Relay Upgrades

$216,488 $12,351 $27,858 $731 $257,428 $85,809 (See Note 1)
(Pending)

TSS111 Electric Junction - Remote End Relay Upgrades

$531,071 $122,825 $68,340 $7,271 $729,507 $243,169 (See Note 1)
(Pending)

L91609 Cut-in

$3,818,675 $1,769,851 $491,400 $104,778 $6,184,704 $2,061,568 (See Note 1)
Stand-Alone Network Upgrades
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
(Pending)

New Interconnection Substation, TSS934 Herman Road

$22,552,684 $12,093,696 $2,902,153 $715,964 $38,264,497 $12,754,832 (See Note 1)
Transmission Owner Interconnection Facilities
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
(Pending)

TSS934 Herman Road Substation, Transmission Owner Interconnection Facilities

$557,950 $831,719 $71,799 $49,239 $1,510,707 $503,569 (See Note 1)
Developer Build Option

Project Developer has the option ("Option to Build") to assume responsibility for the design, procurement and construction of Transmission Owner Interconnection Facilities and/or Stand-Alone Network Upgrades.

If Option to Build is elected, the Project Developer must fulfill additional requirements in accordance to PJM Manual 14C, section 5.1 and PJM Manual 14H, section 8.6.2.

The cost estimates for eligible facilities and Option to Build oversight are highlighted below:

Network Upgrades
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
(Pending)

4 Remote Ends - ICON Nodes at STA 6 Byron, TSS 144 Wayne, TSS 937 Lee County and TSS 113 Waterman

$265,891 $48,746 $89,871 $2,906 $407,414 $135,805 (See Note 1)
(Pending)

TSS155 Electric Junction - Remote End Relay Upgrades

$519,771 $132,521 $98,736 $7,207 $758,235 $252,745 (See Note 1)
(Pending)

TSS120 Electric Junction - Remote End Relay Upgrades

$211,882 $13,326 $40,249 $725 $266,182 $88,727 (See Note 1)
(Pending)

TSS111 Electric Junction - Remote End Relay Upgrades

$519,771 $132,521 $98,736 $7,207 $758,235 $252,745 (See Note 1)
(Pending)

L91609 Cut-in

$3,737,427 $1,909,568 $709,967 $103,843 $6,460,805 $2,153,602 (See Note 1)
(Pending)

Fiber Installation

$2,774,227 $1,545,836 $526,996 $84,063 $4,931,122 $1,643,707 (See Note 1)
(Pending)

Distribution Aux Power (3 miles)

$1,211,626 $792,167 $230,162 $43,078 $2,277,033 $759,011 (See Note 1)
Other
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
(Pending)

TSS934 Herman Road Substation, Transmission Owner Interconnection Facilities, oversight

$62,909 $0 $11,950 $0 $74,859 $24,953 (See Note 1)
(Pending)

New Interconnection Substation, TSS934 Herman Road, oversight

$1,697,695 $0 $322,496 $0 $2,020,191 $673,397 (See Note 1)
Build Option Price Comparison
Build Option Total Cost Allocated Cost
Transmission Owner Build Option $54,982,820 $18,327,607
Developer Build Option $17,954,076 $5,984,692

Based on the scope of work for the Interconnection Facilities, it is expected to take 60 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.

Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.

Notes on Cost Estimate:

  1. These estimates are Order-of-Magnitude estimates of the costs that ComEd would bill to the Project Developer for this interconnection. These estimates are based on a one-line electrical diagram of the project and the information provided by the Project Developer.
  2. There were no site visits performed for these estimates. There may be costs related to specific site related issues that are not identified in these estimates. The site reviews will be performed during the Facilities Study or during detailed engineering.
  3. These estimates are not a guarantee of the maximum amount payable by the Project Developer and the actual costs of ComEd's work may differ significantly from these estimates. The Project Developer will be responsible for paying actual costs of ComEd's work in accordance with the PJM Open Access Transmission Tariff.
  4. The Project Developer is responsible for all engineering, procurement, testing and construction of all equipment on the Project Developer’s side of the Point of Change in Ownership.

These cost estimates do not include cost of acquiring right-of-way for the transmission line and purchasing any additional land, if needed, for the line terminations.

 

Transmission Owner Analysis

No Transmission Owner impacts identified.

 

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. ComEd interconnection requirements can be found here. Refer to AF2-200 Physical Interconnection Facilities Study for additional requirements found in the General Section of the report.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards and in the Physical Interconnection Facilities Study.

Summer Peak Analysis

The New Service Request was evaluated as a 200.0 MW (120.0 MW Capacity) injection in the ComEd area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential summer peak period network impacts were as follows:

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

Summer Peak Analysis
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
COMED_P4_006-45-BT3-8___SRT-A
CONTINGENCY 'COMED_P4_006-45-BT3-8___SRT-A'
 TRIP BRANCH FROM BUS 270678 TO BUS 270679 CKT Z1   /*BYRON    ; B 345.0 - BYRON    ; R 345.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1    /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
Breaker AC 128.12 1837.0 STE 2353.48 118.11
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
COMED_P4_006-45-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_006-45-BT3-4___SRT-A'
 REMOVE UNIT 1 FROM BUS 274656                     /*BYRON    ;1U  25.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1   /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
Breaker AC 127.65 1837.0 STE 2344.89 118.07
CE BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1
COMED_P4_023-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT3-4___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Breaker AC 104.7 1837.0 STE 1923.35 15.31
CE BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1
COMED_P4_023-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
END
Breaker AC 104.67 1837.0 STE 1922.79 15.31
CE BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1
COMED_P4_023-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT4-5___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Breaker AC 104.53 1837.0 STE 1920.2 15.31
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4-6_116-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_116-345-R______SRT-A'
 DISCONNECT BUS 270767                                          /*GOODINGS ;1R 345.0
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 DISCONNECT BUS 275240                                          /*GOODINGS ;1M 138.0
 TRIP BRANCH FROM BUS 270729 TO BUS 271385 TO BUS 275351 CKT 1  /*E FRANKFO; R 345.0 - E FRANKFO; R 138.0 - E FRANKFO;3C  34.5
END
Breaker AC 110.44 2297.0 STE 2536.87 19.38
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4-6_111-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-R______SRT-A'
 DISCONNECT BUS 270731   /*ELECT JCT;4R 345.0
 DISCONNECT BUS 270733   /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183   /*ELECT JCT;3M 138.0
 DISCONNECT BUS 275184   /*ELECT JCT;4M 138.0
END
Breaker AC 122.42 1568.0 STE 1919.57 32.42
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-L11614__SRT-A
CONTINGENCY 'COMED_P4_116-45-L11614__SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270665 CKT 1   /*BLUE ISL ;RT 345.0 - BLUE ISL ; R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270927 CKT 1   /*BLUE ISL ;RT 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 270667 CKT 1   /*GOODINGS ;2R 345.0 - BLUE ISL ;RT 345.0
END
Breaker AC 105.48 2297.0 STE 2422.86 16.46
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_111-45-L11120__SRT-A
CONTINGENCY 'COMED_P4_111-45-L11120__SRT-A'
 DISCONNECT BUS 270733                                 /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183                                 /*ELECT JCT;3M 138.0
 MOVE 100 PERCENT LOAD FROM BUS 270749 TO BUS 270751   /*ESS W407M; R 345.0 - ESS W407M;9T 345.0
 TRIP BRANCH FROM BUS 270733 TO BUS 270747 CKT 1       /*ELECT JCT;3R 345.0 - ESS W407K;0T 345.0
 TRIP BRANCH FROM BUS 270747 TO BUS 270753 CKT 1       /*ESS W407K;0T 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270749 CKT 1       /*ESS W407M;0T 345.0 - ESS W407M; R 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270813 CKT 1       /*ESS W407M;0T 345.0 - LOMBARD  ; R 345.0
END
Breaker AC 118.28 1568.0 STE 1854.57 30.13
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_120-45-L12002__SRT-A
CONTINGENCY 'COMED_P4_120-45-L12002__SRT-A'
 DISCONNECT BUS 275198                             /*LOMBARD  ;2M 138.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270753 CKT 1   /*LOMBARD  ; R 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270781 CKT 1   /*LOMBARD  ; R 345.0 - ITASCA   ; R 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270809 CKT 1   /*LOMBARD  ; R 345.0 - LISLE    ; R 345.0
 TRIP BRANCH FROM BUS 275191 TO BUS 270781 CKT 1   /*ITASCA   ;2M 138.0 - ITASCA   ; R 345.0
 TRIP BRANCH FROM BUS 275191 TO BUS 271735 CKT 1   /*ITASCA   ;2M 138.0 - ITASCA   ; R 138.0
 TRIP BRANCH FROM BUS 275191 TO BUS 275291 CKT 1   /*ITASCA   ;2M 138.0 - ITASCA   ;2C  34.5
END
Breaker AC 118.84 1568.0 STE 1863.47 30.55
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_120-38-TR82____SRT-A
CONTINGENCY 'COMED_P4_120-38-TR82____SRT-A'
 CLOSE LINE FROM BUS 272252 TO BUS 272253 CKT Z1    /*PL HILL  ; B 138.0 - PL HILL  ; R 138.0
 CLOSE LINE FROM BUS 273236 TO BUS 273237 CKT Z1    /*LOMBARD  ;13  13.2 - LOMBARD  ;46  13.2
 DISCONNECT BUS 275198                              /*LOMBARD  ;2M 138.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270753 CKT 1    /*LOMBARD  ; R 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270781 CKT 1    /*LOMBARD  ; R 345.0 - ITASCA   ; R 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270809 CKT 1    /*LOMBARD  ; R 345.0 - LISLE    ; R 345.0
 TRIP BRANCH FROM BUS 271923 TO BUS 271569 CKT 1    /*LOMBARD  ; R 138.0 - GRACE    ; R 138.0
 TRIP BRANCH FROM BUS 271923 TO BUS 271925 CKT Z1   /*LOMBARD  ; R 138.0 - LOMBARD  ;2R 138.0
 TRIP BRANCH FROM BUS 271923 TO BUS 272253 CKT 1    /*LOMBARD  ; R 138.0 - PL HILL  ; R 138.0
 TRIP BRANCH FROM BUS 271923 TO BUS 273237 CKT 2    /*LOMBARD  ; R 138.0 - LOMBARD  ;46  13.2
 TRIP BRANCH FROM BUS 271925 TO BUS 275198 CKT 1    /*LOMBARD  ;2R 138.0 - LOMBARD  ;2M 138.0
END
Breaker AC 118.76 1568.0 STE 1862.12 30.55
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-TR82____SRT-A
CONTINGENCY 'COMED_P4_116-45-TR82____SRT-A'
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 271565 TO BUS 275324 CKT 1  /*GOODINGS ;2R 345.0 - GOODINGS ; R 138.0 - GOODINGS ;2C  34.5
END
Breaker AC 102.37 2297.0 STE 2351.35 16.47
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-L0303___SRT-A
CONTINGENCY 'COMED_P4_116-45-L0303___SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 REMOVE SWSHUNT FROM BUS 270827                    /*NEVADA   ; R 345.0
 TRIP BRANCH FROM BUS 936290 TO BUS 270827 CKT 1   /*AD2-038 TP   345.0 - NEVADA   ; R 345.0
END
Breaker AC 101.56 2297.0 STE 2332.79 16.48
CE AURORA EC;RP-ELECT JCT;4R 345.0 kV Ckt 1 line
274749 to 270731 ckt 1
COMED_P4-6_111-345-B______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-B______SRT-A'
 DISCONNECT BUS 270730                                          /*ELECT JCT; B 345.0
 DISCONNECT BUS 275182                                          /*ELECT JCT;1M 138.0
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Breaker AC 104.35 1568.0 STE 1636.26 32.22
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P2-2_111_EJ-345R__3_SRT-A
CONTINGENCY 'COMED_P2-2_111_EJ-345R__3_SRT-A'
 DISCONNECT BUS 270733   /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183   /*ELECT JCT;3M 138.0
END
Bus AC 118.52 1568.0 STE 1858.36 30.13
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P2-2_116_GG-345R__2_SRT-A
CONTINGENCY 'COMED_P2-2_116_GG-345R__2_SRT-A'
 DISCONNECT BUS 270769   /*GOODINGS ;2R 345.0
END
Bus AC 102.37 2297.0 STE 2351.35 16.47
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Single AC 114.93 1568.0 STE 1802.13 7.04
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Single AC 114.93 1568.0 STE 1802.13 7.04
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Base Case Single AC 113.52 1201.0 A 1363.35 17.57
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-1
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-1'
 TRIP BRANCH FROM BUS 270678 TO BUS 930480 CKT 1   /*BYRON    ; B 345.0 - AB1-089 TP   345.0
END
Single AC 105.93 1568.0 STE 1660.97 7.04
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-1
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-1'
 TRIP BRANCH FROM BUS 270678 TO BUS 930480 CKT 1   /*BYRON    ; B 345.0 - AB1-089 TP   345.0
END
Single AC 105.93 1568.0 STE 1660.97 7.04
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
Base Case Single AC 109.81 1334.0 A 1464.93 64.89
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P1-2_345-L11120_R-N_SRT-A
CONTINGENCY 'COMED_P1-2_345-L11120_R-N_SRT-A'
 MOVE 100 PERCENT LOAD FROM BUS 270749 TO BUS 270751   /*ESS W407M; R 345.0 - ESS W407M;9T 345.0
 TRIP BRANCH FROM BUS 270733 TO BUS 270747 CKT 1       /*ELECT JCT;3R 345.0 - ESS W407K;0T 345.0
 TRIP BRANCH FROM BUS 270747 TO BUS 270753 CKT 1       /*ESS W407K;0T 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270749 CKT 1       /*ESS W407M;0T 345.0 - ESS W407M; R 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270813 CKT 1       /*ESS W407M;0T 345.0 - LOMBARD  ; R 345.0
END
Single AC 102.06 1568.0 STE 1600.22 18.16
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 105.88 1841.0 B 1949.29 16.77
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 105.88 1841.0 B 1949.25 16.77
AEP/CE GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line
270771 to 243229 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 102.59 971.0 B 996.1 11.32
AEP/CE GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line
270771 to 243229 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 102.58 971.0 B 996.09 11.32

Details for AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line l/o COMED_P4_006-45-BT3-8___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
COMED_P4_006-45-BT3-8___SRT-A
CONTINGENCY 'COMED_P4_006-45-BT3-8___SRT-A'
 TRIP BRANCH FROM BUS 270678 TO BUS 270679 CKT Z1   /*BYRON    ; B 345.0 - BYRON    ; R 345.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1    /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
Breaker AC 128.12 1837.0 STE 2353.48 118.11
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
COMED_P4_006-45-BT3-8___SRT-A
CONTINGENCY 'COMED_P4_006-45-BT3-8___SRT-A'
 TRIP BRANCH FROM BUS 270678 TO BUS 270679 CKT Z1   /*BYRON    ; B 345.0 - BYRON    ; R 345.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1    /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
Breaker AC 127.2 1837.0 STE 2336.57 118.14
Topology Case Flowgate Details for AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line l/o COMED_P4_006-45-BT3-8___SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.82 MW 1.55 MW
962012 AG1-044 E Adder 0.15 MW 0.13 MW
290051 GSG-6; E Adder 7.53 MW 6.4 MW
295109 WESTBROOK E Adder 4.03 MW 3.43 MW
295111 SUBLETTE E Adder 1.96 MW 1.67 MW
937002 AD2-134 E Adder 7.28 MW 6.19 MW
958912 AF2-182 E 50/50 100.79 MW 100.79 MW
959081 AF2-199 C 50/50 35.43 MW 35.43 MW
959082 AF2-199 E 50/50 17.72 MW 17.72 MW
274715 NELSON EC;1C 50/50 8.59 MW 8.59 MW
274716 NELSON EC;1S 50/50 6.27 MW 6.27 MW
274717 NELSON EC;2C 50/50 8.66 MW 8.66 MW
274718 NELSON EC;2S 50/50 6.32 MW 6.32 MW
274857 BIG SKY ;U1 50/50 0.78 MW 0.78 MW
274858 BIG SKY ;U2 50/50 0.78 MW 0.78 MW
274859 EASYR;U1 E 50/50 35.21 MW 35.21 MW
274860 EASYR;U2 E 50/50 35.21 MW 35.21 MW
293715 O-029 E Adder 21.16 MW 17.99 MW
293716 O-029 E Adder 11.6 MW 9.86 MW
293717 O-029 E Adder 10.67 MW 9.07 MW
293771 O-035 E Adder 5.99 MW 5.09 MW
294401 BSHIL;1U E Adder 9.16 MW 7.79 MW
294410 BSHIL;2U E Adder 9.16 MW 7.79 MW
925582 AC1-033 E Adder 10.05 MW 8.54 MW
939051 AE1-134 1 50/50 0.61 MW 0.61 MW
939061 AE1-134 2 50/50 4.1 MW 4.1 MW
957471 AF2-041 C 50/50 106.3 MW 106.3 MW
957472 AF2-041 E 50/50 53.15 MW 53.15 MW
274760 LEE CO EC;1U 50/50 4.33 MW 4.33 MW
276676 AA2-030 GEN 50/50 8.01 MW 8.01 MW
276677 AA1-146 50/50 9.7 MW 9.7 MW
293516 O-009 E Adder 40.93 MW 34.79 MW
916212 CRESCENT ;1U Adder 4.21 MW 3.58 MW
927208 AC1-214 E1 Adder 2.84 MW 2.42 MW
927209 AC1-214 E2 Adder 2.84 MW 2.42 MW
957751 AF2-069 C Adder 0.21 MW 0.18 MW
957752 AF2-069 E Adder 0.67 MW 0.57 MW
990901 L-005 E Adder 12.23 MW 10.39 MW
916221 Z1-073 E Adder 5.31 MW 4.51 MW
274761 LEE CO EC;2U 50/50 4.33 MW 4.33 MW
274762 LEE CO EC;3U 50/50 4.33 MW 4.33 MW
274763 LEE CO EC;4U 50/50 4.29 MW 4.29 MW
274764 LEE CO EC;5U 50/50 4.34 MW 4.34 MW
274765 LEE CO EC;6U 50/50 4.34 MW 4.34 MW
274766 LEE CO EC;7U 50/50 4.28 MW 4.28 MW
274767 LEE CO EC;8U 50/50 4.28 MW 4.28 MW
934051 AD1-031 C Adder 3.01 MW 2.56 MW
934052 AD1-031 E Adder 4.91 MW 4.18 MW
959091 AF2-200 C 50/50 70.86 MW 70.86 MW
959092 AF2-200 E 50/50 47.24 MW 47.24 MW
961011 AF2-392 C 50/50 9.66 MW 9.66 MW
961012 AF2-392 E 50/50 44.96 MW 44.96 MW
961021 AF2-393 C Adder 15.1 MW 12.83 MW
961031 AF2-394 C Adder 10.98 MW 9.33 MW
966822 AG1-553 E Adder 67.61 MW 57.47 MW
938861 AE1-114 C Adder 4.98 MW 4.23 MW
938862 AE1-114 E Adder 16.99 MW 14.45 MW
946152 AF1-280 E 50/50 67.19 MW 67.19 MW
946321 AF1-296 C Adder 8.61 MW 7.32 MW
946322 AF1-296 E Adder 40.31 MW 34.27 MW
957761 AF2-070 C Adder 0.29 MW 0.25 MW
957762 AF2-070 E Adder 1.42 MW 1.2 MW
965661 AG1-434 C 50/50 18.55 MW 18.55 MW
965662 AG1-434 E 50/50 73.69 MW 73.69 MW
965671 AG1-435 C Adder 3.47 MW 2.95 MW
965672 AG1-435 E Adder 11.31 MW 9.62 MW
965931 AG1-462 C Adder 36.42 MW 30.96 MW
965932 AG1-462 E Adder 24.28 MW 20.64 MW
961022 AF2-393 E Adder 1.37 MW 1.17 MW
276626 AG1-044 E Adder 0.18 MW 0.15 MW
955972 J1084 External Queue 29.6 MW 29.6 MW
956412 J1131 External Queue 15.52 MW 15.52 MW
990947 J1432 C External Queue 6.48 MW 6.48 MW
990948 J1432 E External Queue 35.04 MW 35.04 MW
991092 J1477 External Queue 7.77 MW 7.77 MW
991667 J2272 External Queue 38.23 MW 38.23 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 65.13 MW 65.13 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 15.02 MW 15.02 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 4.78 MW 4.78 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.35 MW 0.35 MW
NY PJM->LTFIMP_NY CLTF 0.2 MW 0.2 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.01 MW 0.01 MW
WEC LTFEXP_WEC->PJM CLTF 0.0 MW 0.0 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.26 MW 0.26 MW
TVA LTFEXP_TVA->PJM CLTF 2.26 MW 2.26 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.04 MW 0.04 MW
MEC LTFEXP_MEC->PJM CLTF 16.85 MW 16.85 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.04 MW 0.04 MW
LAGN LTFEXP_LAGN->PJM CLTF 4.62 MW 4.62 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.05 MW 0.05 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.25 MW 2.25 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.12 MW 0.12 MW

Details for AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line l/o COMED_P4_006-45-BT3-4___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
COMED_P4_006-45-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_006-45-BT3-4___SRT-A'
 REMOVE UNIT 1 FROM BUS 274656                     /*BYRON    ;1U  25.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1   /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
Breaker AC 127.65 1837.0 STE 2344.89 118.07
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
COMED_P4_006-45-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_006-45-BT3-4___SRT-A'
 REMOVE UNIT 1 FROM BUS 274656                     /*BYRON    ;1U  25.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1   /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
Breaker AC 126.81 1837.0 STE 2329.52 118.11
Topology Case Flowgate Details for AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line l/o COMED_P4_006-45-BT3-4___SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962012 AG1-044 E Adder 0.15 MW 0.13 MW
290051 GSG-6; E Adder 7.46 MW 6.34 MW
295109 WESTBROOK E Adder 4.0 MW 3.4 MW
295111 SUBLETTE E Adder 1.94 MW 1.65 MW
937002 AD2-134 E Adder 7.22 MW 6.13 MW
958912 AF2-182 E 50/50 100.58 MW 100.58 MW
959081 AF2-199 C 50/50 35.42 MW 35.42 MW
959082 AF2-199 E 50/50 17.71 MW 17.71 MW
274715 NELSON EC;1C 50/50 8.57 MW 8.57 MW
274716 NELSON EC;1S 50/50 6.25 MW 6.25 MW
274717 NELSON EC;2C 50/50 8.64 MW 8.64 MW
274718 NELSON EC;2S 50/50 6.31 MW 6.31 MW
274857 BIG SKY ;U1 50/50 0.77 MW 0.77 MW
274858 BIG SKY ;U2 50/50 0.77 MW 0.77 MW
274859 EASYR;U1 E 50/50 35.13 MW 35.13 MW
274860 EASYR;U2 E 50/50 35.13 MW 35.13 MW
293715 O-029 E Adder 21.1 MW 17.94 MW
293716 O-029 E Adder 11.57 MW 9.83 MW
293717 O-029 E Adder 10.63 MW 9.04 MW
293771 O-035 E Adder 5.98 MW 5.08 MW
294401 BSHIL;1U E Adder 9.13 MW 7.76 MW
294410 BSHIL;2U E Adder 9.13 MW 7.76 MW
925582 AC1-033 E Adder 10.01 MW 8.51 MW
939051 AE1-134 1 50/50 0.61 MW 0.61 MW
939061 AE1-134 2 50/50 4.09 MW 4.09 MW
957471 AF2-041 C 50/50 106.27 MW 106.27 MW
957472 AF2-041 E 50/50 53.13 MW 53.13 MW
274760 LEE CO EC;1U 50/50 4.32 MW 4.32 MW
276676 AA2-030 GEN 50/50 8.0 MW 8.0 MW
276677 AA1-146 50/50 9.67 MW 9.67 MW
293516 O-009 E Adder 40.8 MW 34.68 MW
916212 CRESCENT ;1U Adder 4.2 MW 3.57 MW
927208 AC1-214 E1 Adder 2.83 MW 2.41 MW
927209 AC1-214 E2 Adder 2.83 MW 2.41 MW
957751 AF2-069 C Adder 0.21 MW 0.17 MW
957752 AF2-069 E Adder 0.67 MW 0.57 MW
990901 L-005 E Adder 12.19 MW 10.36 MW
916221 Z1-073 E Adder 5.26 MW 4.47 MW
274761 LEE CO EC;2U 50/50 4.32 MW 4.32 MW
274762 LEE CO EC;3U 50/50 4.32 MW 4.32 MW
274763 LEE CO EC;4U 50/50 4.28 MW 4.28 MW
274764 LEE CO EC;5U 50/50 4.33 MW 4.33 MW
274765 LEE CO EC;6U 50/50 4.33 MW 4.33 MW
274766 LEE CO EC;7U 50/50 4.27 MW 4.27 MW
274767 LEE CO EC;8U 50/50 4.27 MW 4.27 MW
934051 AD1-031 C Adder 3.0 MW 2.55 MW
934052 AD1-031 E Adder 4.9 MW 4.17 MW
959091 AF2-200 C 50/50 70.84 MW 70.84 MW
959092 AF2-200 E 50/50 47.23 MW 47.23 MW
961011 AF2-392 C 50/50 9.63 MW 9.63 MW
961012 AF2-392 E 50/50 44.81 MW 44.81 MW
961021 AF2-393 C Adder 15.05 MW 12.79 MW
961031 AF2-394 C Adder 10.94 MW 9.3 MW
966822 AG1-553 E Adder 67.36 MW 57.26 MW
938861 AE1-114 C Adder 4.9 MW 4.16 MW
938862 AE1-114 E Adder 16.71 MW 14.21 MW
946152 AF1-280 E 50/50 67.05 MW 67.05 MW
946321 AF1-296 C Adder 8.58 MW 7.29 MW
946322 AF1-296 E Adder 40.14 MW 34.12 MW
957761 AF2-070 C Adder 0.29 MW 0.25 MW
957762 AF2-070 E Adder 1.41 MW 1.2 MW
965661 AG1-434 C 50/50 18.54 MW 18.54 MW
965662 AG1-434 E 50/50 73.65 MW 73.65 MW
965671 AG1-435 C Adder 3.46 MW 2.94 MW
965672 AG1-435 E Adder 11.28 MW 9.59 MW
965931 AG1-462 C Adder 36.29 MW 30.84 MW
965932 AG1-462 E Adder 24.19 MW 20.56 MW
961022 AF2-393 E Adder 1.37 MW 1.16 MW
276626 AG1-044 E Adder 0.18 MW 0.15 MW
955972 J1084 External Queue 29.56 MW 29.56 MW
956412 J1131 External Queue 15.5 MW 15.5 MW
990947 J1432 C External Queue 6.46 MW 6.46 MW
990948 J1432 E External Queue 34.93 MW 34.93 MW
991092 J1477 External Queue 7.76 MW 7.76 MW
991667 J2272 External Queue 38.14 MW 38.14 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 63.48 MW 63.48 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 14.88 MW 14.88 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 4.72 MW 4.72 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.35 MW 0.35 MW
NY PJM->LTFIMP_NY CLTF 0.2 MW 0.2 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.01 MW 0.01 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.25 MW 0.25 MW
TVA LTFEXP_TVA->PJM CLTF 2.24 MW 2.24 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.04 MW 0.04 MW
MEC LTFEXP_MEC->PJM CLTF 16.68 MW 16.68 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.04 MW 0.04 MW
LAGN LTFEXP_LAGN->PJM CLTF 4.58 MW 4.58 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.05 MW 0.05 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.24 MW 2.24 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.12 MW 0.12 MW

Details for BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o COMED_P4_023-65-BT3-4___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1
COMED_P4_023-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT3-4___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Breaker AC 104.7 1837.0 STE 1923.35 15.31
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1
COMED_P4_023-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT3-4___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Breaker AC 108.63 1837.0 STE 1995.47 15.7
Topology Case Flowgate Details for BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o COMED_P4_023-65-BT3-4___SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.8 MW 1.53 MW
962781 AG1-127 C Adder 4.99 MW 4.25 MW
962782 AG1-127 E Adder 3.32 MW 2.83 MW
966431 AG1-512 C Adder 1.59 MW 1.35 MW
966432 AG1-512 E Adder 2.39 MW 2.03 MW
966441 AG1-513 C Adder 0.36 MW 0.3 MW
966442 AG1-513 E Adder 0.54 MW 0.46 MW
290051 GSG-6; E Adder 7.12 MW 6.05 MW
295109 WESTBROOK E Adder 3.81 MW 3.24 MW
295111 SUBLETTE E Adder 1.85 MW 1.57 MW
933911 AD1-013 C Adder 1.26 MW 1.07 MW
933912 AD1-013 E Adder 2.01 MW 1.71 MW
933932 AD1-016 E Adder 0.95 MW 0.81 MW
934721 AD1-100 C Adder -55.22 MW -46.93 MW
934972 AD1-129 E Adder 0.37 MW 0.32 MW
937002 AD2-134 E Adder 6.88 MW 5.85 MW
937312 AD2-172 E Adder 2.03 MW 1.72 MW
942991 AE2-321 C Adder 5.15 MW 4.38 MW
942992 AE2-321 E Adder 2.54 MW 2.16 MW
943801 AF1-048 C Adder 2.41 MW 2.05 MW
943802 AF1-048 E Adder 1.61 MW 1.36 MW
958912 AF2-182 E Adder 19.62 MW 16.67 MW
959081 AF2-199 C Adder 4.59 MW 3.9 MW
959082 AF2-199 E Adder 2.3 MW 1.95 MW
960582 AF2-349 E Adder 22.46 MW 19.09 MW
960751 AF2-366 C Adder 4.98 MW 4.23 MW
960752 AF2-366 E Adder 3.32 MW 2.82 MW
274654 BRAIDWOOD;1U 50/50 68.15 MW 68.15 MW
274655 BRAIDWOOD;2U 50/50 65.63 MW 65.63 MW
274660 LASCO STA;1U 50/50 49.04 MW 49.04 MW
274661 LASCO STA;2U 50/50 49.22 MW 49.22 MW
274675 JOLIET 29;7U Adder 26.16 MW 22.24 MW
274676 JOLIET 29;8U Adder 33.66 MW 28.61 MW
274682 WAUKEGAN ;7U Adder 24.54 MW 20.86 MW
274683 WAUKEGAN ;8U Adder 26.4 MW 22.44 MW
274847 GR RIDGE ;BU 50/50 0.94 MW 0.94 MW
274859 EASYR;U1 E Adder 6.96 MW 5.92 MW
274860 EASYR;U2 E Adder 6.96 MW 5.92 MW
274871 GR RIDGE ;2U 50/50 0.35 MW 0.35 MW
276173 Z2-081 50/50 0.24 MW 0.24 MW
276591 L-013 2 Adder 2.55 MW 2.17 MW
293061 N-015 E 50/50 27.26 MW 27.26 MW
294392 P-010 E 50/50 34.62 MW 34.62 MW
294763 P-046 E Adder 5.63 MW 4.79 MW
939061 AE1-134 2 Adder 0.77 MW 0.65 MW
940502 AE2-035 E Adder 2.03 MW 1.72 MW
946501 AF1-314 C Adder 2.6 MW 2.21 MW
946502 AF1-314 E Adder 12.21 MW 10.38 MW
946661 AF1-330 C Adder 1.26 MW 1.07 MW
946662 AF1-330 E Adder 0.28 MW 0.23 MW
957331 AF2-027 C Adder 1.48 MW 1.25 MW
957332 AF2-027 E Adder 2.22 MW 1.88 MW
957471 AF2-041 C Adder 13.78 MW 11.71 MW
957472 AF2-041 E Adder 6.89 MW 5.86 MW
958021 AF2-096 C 50/50 64.12 MW 64.12 MW
958022 AF2-096 E 50/50 42.75 MW 42.75 MW
276678 AD1-016 C Adder 0.58 MW 0.49 MW
276679 AD1-129 C Adder 0.56 MW 0.48 MW
290108 LEEDK;1U E Adder 17.12 MW 14.56 MW
916221 Z1-073 E Adder 5.02 MW 4.26 MW
926821 AC1-168 C Adder 0.8 MW 0.68 MW
926822 AC1-168 E Adder 5.37 MW 4.57 MW
943121 AE2-341 C 50/50 10.92 MW 10.92 MW
943122 AE2-341 E 50/50 5.36 MW 5.36 MW
943591 AF1-030 C 50/50 7.26 MW 7.26 MW
943592 AF1-030 E 50/50 3.59 MW 3.59 MW
959091 AF2-200 C Adder 9.19 MW 7.81 MW
959092 AF2-200 E Adder 6.13 MW 5.21 MW
959101 AF2-201 C Adder 3.59 MW 3.05 MW
959102 AF2-201 E Adder 10.31 MW 8.77 MW
960381 AF2-329 C 50/50 4.58 MW 4.58 MW
960721 AF2-363 C Adder 4.0 MW 3.4 MW
960722 AF2-363 E Adder 2.67 MW 2.27 MW
961011 AF2-392 C Adder 2.24 MW 1.91 MW
961012 AF2-392 E Adder 10.43 MW 8.87 MW
961021 AF2-393 C Adder 3.5 MW 2.98 MW
961031 AF2-394 C Adder 2.55 MW 2.17 MW
930481 AB1-089 C Adder 40.68 MW 34.57 MW
930482 AB1-089 E Adder 1.85 MW 1.57 MW
938861 AE1-114 C Adder 2.31 MW 1.97 MW
938862 AE1-114 E Adder 7.89 MW 6.71 MW
946152 AF1-280 E Adder 13.08 MW 11.12 MW
946671 AF1-331 C Adder 1.63 MW 1.39 MW
962691 AG1-118 C Adder 15.93 MW 13.54 MW
962692 AG1-118 E Adder 10.62 MW 9.03 MW
962711 AG1-120 C Adder 5.83 MW 4.95 MW
962712 AG1-120 E Adder 3.88 MW 3.3 MW
965661 AG1-434 C Adder 2.58 MW 2.19 MW
965662 AG1-434 E Adder 10.23 MW 8.7 MW
961022 AF2-393 E Adder 0.32 MW 0.27 MW
920272 AA2-123 E Adder 1.81 MW 1.54 MW
276170 Z1-108 E Adder 1.87 MW 1.59 MW
276675 AE2-062 E Adder 0.08 MW 0.07 MW
945351 AF1-200 FTIR 50/50 335.18 MW 335.18 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 40.5 MW 40.5 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.65 MW 1.65 MW
NY PJM->LTFIMP_NY CLTF 0.87 MW 0.87 MW
WEC LTFEXP_WEC->PJM CLTF 2.23 MW 2.23 MW
COTTONWOOD PJM->LTFIMP_COTTONWOOD CLTF 1.79 MW 1.79 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.87 MW 0.87 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.52 MW 0.52 MW
PRAIRIE PJM->LTFIMP_PRAIRIE CLTF 3.95 MW 3.95 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 1.0 MW 1.0 MW
MEC LTFEXP_MEC->PJM CLTF 4.42 MW 4.42 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 3.11 MW 3.11 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 10.56 MW 10.56 MW
LTFEXP_AC1-056 LTFEXP_AC1-056->LTFIMP_AC1-056 CLTF 2.42 MW 2.42 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.14 MW 1.14 MW

Details for BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o COMED_P4_023-65-BT2-3___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1
COMED_P4_023-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
END
Breaker AC 104.67 1837.0 STE 1922.79 15.31
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1
COMED_P4_023-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
END
Breaker AC 108.59 1837.0 STE 1994.88 15.7
Topology Case Flowgate Details for BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o COMED_P4_023-65-BT2-3___SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.8 MW 1.53 MW
962781 AG1-127 C Adder 4.99 MW 4.25 MW
962782 AG1-127 E Adder 3.32 MW 2.83 MW
966431 AG1-512 C Adder 1.59 MW 1.35 MW
966432 AG1-512 E Adder 2.39 MW 2.03 MW
966441 AG1-513 C Adder 0.36 MW 0.3 MW
966442 AG1-513 E Adder 0.54 MW 0.46 MW
290051 GSG-6; E Adder 7.12 MW 6.05 MW
295109 WESTBROOK E Adder 3.81 MW 3.24 MW
295111 SUBLETTE E Adder 1.85 MW 1.57 MW
933911 AD1-013 C Adder 1.26 MW 1.07 MW
933912 AD1-013 E Adder 2.01 MW 1.71 MW
933932 AD1-016 E Adder 0.95 MW 0.81 MW
934721 AD1-100 C Adder -55.22 MW -46.93 MW
934972 AD1-129 E Adder 0.37 MW 0.32 MW
937002 AD2-134 E Adder 6.88 MW 5.85 MW
937312 AD2-172 E Adder 2.03 MW 1.72 MW
942991 AE2-321 C Adder 5.15 MW 4.38 MW
942992 AE2-321 E Adder 2.54 MW 2.16 MW
943801 AF1-048 C Adder 2.41 MW 2.05 MW
943802 AF1-048 E Adder 1.61 MW 1.36 MW
958912 AF2-182 E Adder 19.62 MW 16.67 MW
959081 AF2-199 C Adder 4.59 MW 3.9 MW
959082 AF2-199 E Adder 2.3 MW 1.95 MW
960582 AF2-349 E Adder 22.46 MW 19.09 MW
960751 AF2-366 C Adder 4.98 MW 4.23 MW
960752 AF2-366 E Adder 3.32 MW 2.82 MW
274654 BRAIDWOOD;1U 50/50 68.15 MW 68.15 MW
274655 BRAIDWOOD;2U 50/50 65.63 MW 65.63 MW
274660 LASCO STA;1U 50/50 49.04 MW 49.04 MW
274661 LASCO STA;2U 50/50 49.22 MW 49.22 MW
274675 JOLIET 29;7U Adder 26.16 MW 22.24 MW
274676 JOLIET 29;8U Adder 33.66 MW 28.61 MW
274682 WAUKEGAN ;7U Adder 24.54 MW 20.86 MW
274683 WAUKEGAN ;8U Adder 26.4 MW 22.44 MW
274847 GR RIDGE ;BU 50/50 0.94 MW 0.94 MW
274859 EASYR;U1 E Adder 6.96 MW 5.92 MW
274860 EASYR;U2 E Adder 6.96 MW 5.92 MW
274871 GR RIDGE ;2U 50/50 0.35 MW 0.35 MW
276173 Z2-081 50/50 0.24 MW 0.24 MW
276591 L-013 2 Adder 2.55 MW 2.17 MW
293061 N-015 E 50/50 27.26 MW 27.26 MW
294392 P-010 E 50/50 34.62 MW 34.62 MW
294763 P-046 E Adder 5.63 MW 4.79 MW
939061 AE1-134 2 Adder 0.77 MW 0.65 MW
940502 AE2-035 E Adder 2.03 MW 1.72 MW
946501 AF1-314 C Adder 2.6 MW 2.21 MW
946502 AF1-314 E Adder 12.21 MW 10.38 MW
946661 AF1-330 C Adder 1.26 MW 1.07 MW
946662 AF1-330 E Adder 0.28 MW 0.23 MW
957331 AF2-027 C Adder 1.48 MW 1.25 MW
957332 AF2-027 E Adder 2.22 MW 1.88 MW
957471 AF2-041 C Adder 13.78 MW 11.71 MW
957472 AF2-041 E Adder 6.89 MW 5.86 MW
958021 AF2-096 C 50/50 64.12 MW 64.12 MW
958022 AF2-096 E 50/50 42.75 MW 42.75 MW
276678 AD1-016 C Adder 0.58 MW 0.49 MW
276679 AD1-129 C Adder 0.56 MW 0.48 MW
290108 LEEDK;1U E Adder 17.12 MW 14.56 MW
916221 Z1-073 E Adder 5.02 MW 4.26 MW
926821 AC1-168 C Adder 0.8 MW 0.68 MW
926822 AC1-168 E Adder 5.37 MW 4.57 MW
943121 AE2-341 C 50/50 10.92 MW 10.92 MW
943122 AE2-341 E 50/50 5.36 MW 5.36 MW
943591 AF1-030 C 50/50 7.26 MW 7.26 MW
943592 AF1-030 E 50/50 3.59 MW 3.59 MW
959091 AF2-200 C Adder 9.19 MW 7.81 MW
959092 AF2-200 E Adder 6.13 MW 5.21 MW
959101 AF2-201 C Adder 3.59 MW 3.05 MW
959102 AF2-201 E Adder 10.31 MW 8.77 MW
960381 AF2-329 C 50/50 4.58 MW 4.58 MW
960721 AF2-363 C Adder 4.0 MW 3.4 MW
960722 AF2-363 E Adder 2.67 MW 2.27 MW
961011 AF2-392 C Adder 2.24 MW 1.91 MW
961012 AF2-392 E Adder 10.43 MW 8.87 MW
961021 AF2-393 C Adder 3.5 MW 2.98 MW
961031 AF2-394 C Adder 2.55 MW 2.17 MW
930481 AB1-089 C Adder 40.68 MW 34.57 MW
930482 AB1-089 E Adder 1.85 MW 1.57 MW
938861 AE1-114 C Adder 2.31 MW 1.97 MW
938862 AE1-114 E Adder 7.89 MW 6.71 MW
946152 AF1-280 E Adder 13.08 MW 11.12 MW
946671 AF1-331 C Adder 1.63 MW 1.39 MW
962691 AG1-118 C Adder 15.93 MW 13.54 MW
962692 AG1-118 E Adder 10.62 MW 9.03 MW
962711 AG1-120 C Adder 5.83 MW 4.95 MW
962712 AG1-120 E Adder 3.88 MW 3.3 MW
965661 AG1-434 C Adder 2.58 MW 2.19 MW
965662 AG1-434 E Adder 10.23 MW 8.7 MW
961022 AF2-393 E Adder 0.32 MW 0.27 MW
920272 AA2-123 E Adder 1.81 MW 1.54 MW
276170 Z1-108 E Adder 1.87 MW 1.59 MW
276675 AE2-062 E Adder 0.08 MW 0.07 MW
945351 AF1-200 FTIR 50/50 335.18 MW 335.18 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 40.5 MW 40.5 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.65 MW 1.65 MW
NY PJM->LTFIMP_NY CLTF 0.87 MW 0.87 MW
WEC LTFEXP_WEC->PJM CLTF 2.23 MW 2.23 MW
COTTONWOOD PJM->LTFIMP_COTTONWOOD CLTF 1.79 MW 1.79 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.87 MW 0.87 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.52 MW 0.52 MW
PRAIRIE PJM->LTFIMP_PRAIRIE CLTF 3.95 MW 3.95 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 1.0 MW 1.0 MW
MEC LTFEXP_MEC->PJM CLTF 4.42 MW 4.42 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 3.11 MW 3.11 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 10.56 MW 10.56 MW
LTFEXP_AC1-056 LTFEXP_AC1-056->LTFIMP_AC1-056 CLTF 2.42 MW 2.42 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.14 MW 1.14 MW

Details for BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o COMED_P4_023-65-BT4-5___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1
COMED_P4_023-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT4-5___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Breaker AC 104.53 1837.0 STE 1920.2 15.31
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1
COMED_P4_023-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT4-5___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Breaker AC 108.45 1837.0 STE 1992.31 15.7
Topology Case Flowgate Details for BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o COMED_P4_023-65-BT4-5___SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.8 MW 1.53 MW
962781 AG1-127 C Adder 4.99 MW 4.25 MW
962782 AG1-127 E Adder 3.32 MW 2.83 MW
966431 AG1-512 C Adder 1.59 MW 1.35 MW
966432 AG1-512 E Adder 2.39 MW 2.03 MW
966441 AG1-513 C Adder 0.36 MW 0.3 MW
966442 AG1-513 E Adder 0.54 MW 0.46 MW
290051 GSG-6; E Adder 7.12 MW 6.05 MW
295109 WESTBROOK E Adder 3.81 MW 3.24 MW
295111 SUBLETTE E Adder 1.85 MW 1.57 MW
933911 AD1-013 C Adder 1.26 MW 1.07 MW
933912 AD1-013 E Adder 2.01 MW 1.71 MW
933932 AD1-016 E Adder 0.95 MW 0.81 MW
934721 AD1-100 C Adder -55.22 MW -46.93 MW
934972 AD1-129 E Adder 0.37 MW 0.32 MW
937002 AD2-134 E Adder 6.88 MW 5.85 MW
937312 AD2-172 E Adder 2.03 MW 1.72 MW
942991 AE2-321 C Adder 5.15 MW 4.38 MW
942992 AE2-321 E Adder 2.54 MW 2.16 MW
943801 AF1-048 C Adder 2.41 MW 2.05 MW
943802 AF1-048 E Adder 1.61 MW 1.36 MW
958912 AF2-182 E Adder 19.62 MW 16.67 MW
959081 AF2-199 C Adder 4.59 MW 3.9 MW
959082 AF2-199 E Adder 2.3 MW 1.95 MW
960582 AF2-349 E Adder 22.46 MW 19.09 MW
960751 AF2-366 C Adder 4.98 MW 4.23 MW
960752 AF2-366 E Adder 3.32 MW 2.82 MW
274654 BRAIDWOOD;1U 50/50 68.15 MW 68.15 MW
274655 BRAIDWOOD;2U 50/50 65.63 MW 65.63 MW
274660 LASCO STA;1U 50/50 49.04 MW 49.04 MW
274661 LASCO STA;2U 50/50 49.22 MW 49.22 MW
274675 JOLIET 29;7U Adder 26.16 MW 22.24 MW
274676 JOLIET 29;8U Adder 33.66 MW 28.61 MW
274682 WAUKEGAN ;7U Adder 24.54 MW 20.86 MW
274683 WAUKEGAN ;8U Adder 26.4 MW 22.44 MW
274847 GR RIDGE ;BU 50/50 0.94 MW 0.94 MW
274859 EASYR;U1 E Adder 6.96 MW 5.92 MW
274860 EASYR;U2 E Adder 6.96 MW 5.92 MW
274871 GR RIDGE ;2U 50/50 0.35 MW 0.35 MW
276173 Z2-081 50/50 0.24 MW 0.24 MW
276591 L-013 2 Adder 2.55 MW 2.17 MW
293061 N-015 E 50/50 27.26 MW 27.26 MW
294392 P-010 E 50/50 34.62 MW 34.62 MW
294763 P-046 E Adder 5.63 MW 4.79 MW
939061 AE1-134 2 Adder 0.77 MW 0.65 MW
940502 AE2-035 E Adder 2.03 MW 1.72 MW
946501 AF1-314 C Adder 2.6 MW 2.21 MW
946502 AF1-314 E Adder 12.21 MW 10.38 MW
946661 AF1-330 C Adder 1.26 MW 1.07 MW
946662 AF1-330 E Adder 0.28 MW 0.23 MW
957331 AF2-027 C Adder 1.48 MW 1.25 MW
957332 AF2-027 E Adder 2.22 MW 1.88 MW
957471 AF2-041 C Adder 13.78 MW 11.71 MW
957472 AF2-041 E Adder 6.89 MW 5.86 MW
958021 AF2-096 C 50/50 64.12 MW 64.12 MW
958022 AF2-096 E 50/50 42.75 MW 42.75 MW
276678 AD1-016 C Adder 0.58 MW 0.49 MW
276679 AD1-129 C Adder 0.56 MW 0.48 MW
290108 LEEDK;1U E Adder 17.12 MW 14.56 MW
916221 Z1-073 E Adder 5.02 MW 4.26 MW
926821 AC1-168 C Adder 0.8 MW 0.68 MW
926822 AC1-168 E Adder 5.37 MW 4.57 MW
943121 AE2-341 C 50/50 10.92 MW 10.92 MW
943122 AE2-341 E 50/50 5.36 MW 5.36 MW
943591 AF1-030 C 50/50 7.26 MW 7.26 MW
943592 AF1-030 E 50/50 3.59 MW 3.59 MW
959091 AF2-200 C Adder 9.19 MW 7.81 MW
959092 AF2-200 E Adder 6.13 MW 5.21 MW
959101 AF2-201 C Adder 3.59 MW 3.05 MW
959102 AF2-201 E Adder 10.31 MW 8.77 MW
960381 AF2-329 C 50/50 4.58 MW 4.58 MW
960721 AF2-363 C Adder 4.0 MW 3.4 MW
960722 AF2-363 E Adder 2.67 MW 2.27 MW
961011 AF2-392 C Adder 2.24 MW 1.91 MW
961012 AF2-392 E Adder 10.43 MW 8.87 MW
961021 AF2-393 C Adder 3.5 MW 2.98 MW
961031 AF2-394 C Adder 2.55 MW 2.17 MW
930481 AB1-089 C Adder 40.68 MW 34.57 MW
930482 AB1-089 E Adder 1.85 MW 1.57 MW
938861 AE1-114 C Adder 2.31 MW 1.97 MW
938862 AE1-114 E Adder 7.89 MW 6.71 MW
946152 AF1-280 E Adder 13.08 MW 11.12 MW
946671 AF1-331 C Adder 1.63 MW 1.39 MW
962691 AG1-118 C Adder 15.93 MW 13.54 MW
962692 AG1-118 E Adder 10.62 MW 9.03 MW
962711 AG1-120 C Adder 5.83 MW 4.95 MW
962712 AG1-120 E Adder 3.88 MW 3.3 MW
965661 AG1-434 C Adder 2.58 MW 2.19 MW
965662 AG1-434 E Adder 10.23 MW 8.7 MW
961022 AF2-393 E Adder 0.32 MW 0.27 MW
920272 AA2-123 E Adder 1.81 MW 1.54 MW
276170 Z1-108 E Adder 1.87 MW 1.59 MW
276675 AE2-062 E Adder 0.08 MW 0.07 MW
945351 AF1-200 FTIR 50/50 335.18 MW 335.18 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 40.5 MW 40.5 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.65 MW 1.65 MW
NY PJM->LTFIMP_NY CLTF 0.87 MW 0.87 MW
WEC LTFEXP_WEC->PJM CLTF 2.23 MW 2.23 MW
COTTONWOOD PJM->LTFIMP_COTTONWOOD CLTF 1.79 MW 1.79 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.87 MW 0.87 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.52 MW 0.52 MW
PRAIRIE PJM->LTFIMP_PRAIRIE CLTF 3.95 MW 3.95 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 1.0 MW 1.0 MW
MEC LTFEXP_MEC->PJM CLTF 4.42 MW 4.42 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 3.11 MW 3.11 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 10.56 MW 10.56 MW
LTFEXP_AC1-056 LTFEXP_AC1-056->LTFIMP_AC1-056 CLTF 2.42 MW 2.42 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.14 MW 1.14 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4-6_116-345-R______SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4-6_116-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_116-345-R______SRT-A'
 DISCONNECT BUS 270767                                          /*GOODINGS ;1R 345.0
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 DISCONNECT BUS 275240                                          /*GOODINGS ;1M 138.0
 TRIP BRANCH FROM BUS 270729 TO BUS 271385 TO BUS 275351 CKT 1  /*E FRANKFO; R 345.0 - E FRANKFO; R 138.0 - E FRANKFO;3C  34.5
END
Breaker AC 110.44 2297.0 STE 2536.87 19.38
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4-6_116-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_116-345-R______SRT-A'
 DISCONNECT BUS 270767                                          /*GOODINGS ;1R 345.0
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 DISCONNECT BUS 275240                                          /*GOODINGS ;1M 138.0
 TRIP BRANCH FROM BUS 270729 TO BUS 271385 TO BUS 275351 CKT 1  /*E FRANKFO; R 345.0 - E FRANKFO; R 138.0 - E FRANKFO;3C  34.5
END
Breaker AC 113.18 2297.0 STE 2599.7 19.13
Topology Case Flowgate Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4-6_116-345-R______SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.99 MW 1.69 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C Adder 5.12 MW 4.35 MW
962782 AG1-127 E Adder 3.41 MW 2.9 MW
966441 AG1-513 C Adder 0.37 MW 0.31 MW
966442 AG1-513 E Adder 0.56 MW 0.47 MW
290021 O50 E Adder 25.8 MW 21.93 MW
290051 GSG-6; E Adder 7.92 MW 6.73 MW
295109 WESTBROOK E Adder 4.24 MW 3.6 MW
295111 SUBLETTE E Adder 2.06 MW 1.75 MW
918052 AA1-018 E OP Adder 19.31 MW 16.41 MW
933911 AD1-013 C Adder 1.39 MW 1.18 MW
933912 AD1-013 E Adder 2.22 MW 1.89 MW
933932 AD1-016 E Adder 1.23 MW 1.05 MW
934972 AD1-129 E Adder 0.49 MW 0.42 MW
937002 AD2-134 E Adder 7.66 MW 6.51 MW
937312 AD2-172 E Adder 2.78 MW 2.37 MW
937401 AD2-194 1 50/50 1.86 MW 1.86 MW
937411 AD2-194 2 50/50 1.87 MW 1.87 MW
942991 AE2-321 C Adder 6.65 MW 5.65 MW
942992 AE2-321 E Adder 3.27 MW 2.78 MW
943801 AF1-048 C Adder 3.11 MW 2.64 MW
943802 AF1-048 E Adder 2.07 MW 1.76 MW
958481 AF2-142 C Adder 13.32 MW 11.32 MW
958482 AF2-142 E Adder 8.88 MW 7.55 MW
958491 AF2-143 C Adder 13.47 MW 11.45 MW
958492 AF2-143 E Adder 8.98 MW 7.63 MW
958912 AF2-182 E Adder 28.43 MW 24.17 MW
959081 AF2-199 C Adder 5.81 MW 4.94 MW
959082 AF2-199 E Adder 2.91 MW 2.47 MW
959351 AF2-226 C 50/50 5.86 MW 5.86 MW
959352 AF2-226 E 50/50 8.8 MW 8.8 MW
960281 AF2-319 C 50/50 5.86 MW 5.86 MW
960282 AF2-319 E 50/50 8.8 MW 8.8 MW
960582 AF2-349 E Adder 29.63 MW 25.19 MW
960751 AF2-366 C Adder 5.1 MW 4.34 MW
960752 AF2-366 E Adder 3.4 MW 2.89 MW
274675 JOLIET 29;7U Adder 84.91 MW 72.17 MW
274676 JOLIET 29;8U Adder 83.65 MW 71.1 MW
274682 WAUKEGAN ;7U Adder 35.29 MW 30.0 MW
274683 WAUKEGAN ;8U Adder 38.0 MW 32.3 MW
274728 ELWOOD EC;5P 50/50 4.81 MW 4.81 MW
274729 ELWOOD EC;1P 50/50 4.78 MW 4.78 MW
274730 ELWOOD EC;6P 50/50 4.81 MW 4.81 MW
274731 ELWOOD EC;2P 50/50 4.78 MW 4.78 MW
274732 ELWOOD EC;7P 50/50 4.81 MW 4.81 MW
274733 ELWOOD EC;3P 50/50 4.78 MW 4.78 MW
274734 ELWOOD EC;8P 50/50 4.81 MW 4.81 MW
274736 ELWOOD EC;9P 50/50 4.81 MW 4.81 MW
274859 EASYR;U1 E Adder 9.97 MW 8.47 MW
274860 EASYR;U2 E Adder 9.97 MW 8.47 MW
274861 TOP CROP ;1U 50/50 0.82 MW 0.82 MW
274862 TOP CROP ;2U 50/50 1.56 MW 1.56 MW
276591 L-013 2 Adder 2.79 MW 2.37 MW
293644 O22 E1 50/50 33.69 MW 33.69 MW
293645 O22 E2 50/50 38.59 MW 38.59 MW
293715 O-029 E Adder 8.22 MW 6.99 MW
293716 O-029 E Adder 4.51 MW 3.83 MW
293717 O-029 E Adder 4.14 MW 3.52 MW
293771 O-035 E Adder 5.74 MW 4.88 MW
294401 BSHIL;1U E Adder 7.49 MW 6.36 MW
294410 BSHIL;2U E Adder 7.49 MW 6.36 MW
294763 P-046 E Adder 7.73 MW 6.57 MW
925582 AC1-033 E Adder 8.21 MW 6.98 MW
938511 AE1-070 1 50/50 14.88 MW 14.88 MW
938521 AE1-070 2 50/50 13.54 MW 13.54 MW
939061 AE1-134 2 Adder 1.15 MW 0.97 MW
940502 AE2-035 E Adder 2.78 MW 2.37 MW
946501 AF1-314 C Adder 3.57 MW 3.03 MW
946502 AF1-314 E Adder 16.77 MW 14.26 MW
946661 AF1-330 C Adder 1.63 MW 1.39 MW
946662 AF1-330 E Adder 0.36 MW 0.3 MW
957331 AF2-027 C Adder 2.13 MW 1.81 MW
957332 AF2-027 E Adder 3.19 MW 2.71 MW
957401 AF2-034 C Adder 1.96 MW 1.67 MW
957402 AF2-034 E Adder 1.67 MW 1.42 MW
957471 AF2-041 C Adder 17.44 MW 14.83 MW
957472 AF2-041 E Adder 8.72 MW 7.41 MW
938851 AE1-113 C Adder 10.64 MW 9.05 MW
938852 AE1-113 E Adder 37.74 MW 32.08 MW
934101 AD2-000 1 Adder 5.94 MW 5.05 MW
934111 AD2-000 2 Adder 7.96 MW 6.77 MW
276640 AC1-204 GEN1 50/50 17.79 MW 17.79 MW
276642 AC1-204 GEN2 50/50 17.88 MW 17.88 MW
276678 AD1-016 C Adder 0.75 MW 0.64 MW
276679 AD1-129 C Adder 0.74 MW 0.62 MW
293516 O-009 E Adder 15.89 MW 13.51 MW
916212 CRESCENT ;1U Adder 4.03 MW 3.43 MW
927208 AC1-214 E1 Adder 2.72 MW 2.31 MW
927209 AC1-214 E2 Adder 2.72 MW 2.31 MW
957751 AF2-069 C Adder 0.2 MW 0.17 MW
957752 AF2-069 E Adder 0.64 MW 0.54 MW
990901 L-005 E Adder 11.43 MW 9.72 MW
290108 LEEDK;1U E Adder 4.02 MW 3.42 MW
916221 Z1-073 E Adder 5.58 MW 4.75 MW
934051 AD1-031 C Adder 2.5 MW 2.13 MW
934052 AD1-031 E Adder 4.08 MW 3.47 MW
936291 AD2-038 C Adder 3.95 MW 3.36 MW
936292 AD2-038 E Adder 18.5 MW 15.72 MW
936511 AD2-066 C Adder 7.09 MW 6.03 MW
936512 AD2-066 E Adder 4.73 MW 4.02 MW
942421 AE2-255 C Adder 4.03 MW 3.43 MW
942422 AE2-255 E Adder 12.1 MW 10.28 MW
942651 AE2-281 C Adder 1.05 MW 0.89 MW
942652 AE2-281 E Adder 6.44 MW 5.47 MW
959091 AF2-200 C Adder 11.63 MW 9.88 MW
959092 AF2-200 E Adder 7.75 MW 6.59 MW
959101 AF2-201 C Adder 4.93 MW 4.19 MW
959102 AF2-201 E Adder 14.16 MW 12.04 MW
960721 AF2-363 C Adder 4.52 MW 3.84 MW
960722 AF2-363 E Adder 3.01 MW 2.56 MW
961011 AF2-392 C Adder 3.3 MW 2.81 MW
961012 AF2-392 E Adder 15.36 MW 13.06 MW
961021 AF2-393 C Adder 5.16 MW 4.38 MW
961031 AF2-394 C Adder 3.75 MW 3.19 MW
966822 AG1-553 E Adder 25.86 MW 21.98 MW
930481 AB1-089 C Adder 53.47 MW 45.45 MW
930482 AB1-089 E Adder 2.43 MW 2.07 MW
938861 AE1-114 C Adder 3.23 MW 2.75 MW
938862 AE1-114 E Adder 11.02 MW 9.37 MW
939321 AE1-163 C Adder 7.33 MW 6.23 MW
939322 AE1-163 E Adder 45.05 MW 38.29 MW
946152 AF1-280 E Adder 18.96 MW 16.11 MW
946321 AF1-296 C Adder 3.4 MW 2.89 MW
946322 AF1-296 E Adder 15.93 MW 13.54 MW
946671 AF1-331 C Adder 1.81 MW 1.54 MW
962691 AG1-118 C Adder 16.13 MW 13.71 MW
962692 AG1-118 E Adder 10.75 MW 9.14 MW
962711 AG1-120 C Adder 6.58 MW 5.6 MW
962712 AG1-120 E Adder 4.39 MW 3.73 MW
957761 AF2-070 C Adder 0.28 MW 0.24 MW
957762 AF2-070 E Adder 1.36 MW 1.15 MW
965661 AG1-434 C Adder 3.39 MW 2.88 MW
965662 AG1-434 E Adder 13.45 MW 11.43 MW
965671 AG1-435 C Adder 3.19 MW 2.71 MW
965672 AG1-435 E Adder 10.42 MW 8.85 MW
965931 AG1-462 C Adder 13.93 MW 11.84 MW
965932 AG1-462 E Adder 9.29 MW 7.89 MW
961022 AF2-393 E Adder 0.47 MW 0.4 MW
276626 AG1-044 E Adder 0.06 MW 0.05 MW
920272 AA2-123 E Adder 2.34 MW 1.99 MW
276170 Z1-108 E Adder 2.38 MW 2.03 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.35 MW 69.35 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 12.06 MW 12.06 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.27 MW 1.27 MW
NY PJM->LTFIMP_NY CLTF 0.69 MW 0.69 MW
WEC LTFEXP_WEC->PJM CLTF 3.32 MW 3.32 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.26 MW 0.26 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.12 MW 0.12 MW
TVA LTFEXP_TVA->PJM CLTF 1.28 MW 1.28 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.41 MW 0.41 MW
MEC LTFEXP_MEC->PJM CLTF 11.43 MW 11.43 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.19 MW 1.19 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.16 MW 3.16 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 8.17 MW 8.17 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.4 MW 0.4 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4-6_111-345-R______SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4-6_111-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-R______SRT-A'
 DISCONNECT BUS 270731   /*ELECT JCT;4R 345.0
 DISCONNECT BUS 270733   /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183   /*ELECT JCT;3M 138.0
 DISCONNECT BUS 275184   /*ELECT JCT;4M 138.0
END
Breaker AC 122.42 1568.0 STE 1919.57 32.42
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4-6_111-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-R______SRT-A'
 DISCONNECT BUS 270731   /*ELECT JCT;4R 345.0
 DISCONNECT BUS 270733   /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183   /*ELECT JCT;3M 138.0
 DISCONNECT BUS 275184   /*ELECT JCT;4M 138.0
END
Breaker AC 120.36 1568.0 STE 1887.24 32.39
Topology Case Flowgate Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4-6_111-345-R______SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.44 MW 2.08 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C 50/50 6.81 MW 6.81 MW
962782 AG1-127 E 50/50 4.53 MW 4.53 MW
966441 AG1-513 C 50/50 0.53 MW 0.53 MW
966442 AG1-513 E 50/50 0.8 MW 0.8 MW
290051 GSG-6; E Adder 9.69 MW 8.23 MW
295109 WESTBROOK E Adder 5.19 MW 4.41 MW
295111 SUBLETTE E Adder 2.52 MW 2.14 MW
933911 AD1-013 C Adder 1.71 MW 1.46 MW
933912 AD1-013 E Adder 2.74 MW 2.33 MW
933932 AD1-016 E Adder 0.76 MW 0.65 MW
934972 AD1-129 E Adder 0.33 MW 0.28 MW
937002 AD2-134 E Adder 9.36 MW 7.96 MW
937312 AD2-172 E Adder 2.08 MW 1.77 MW
942991 AE2-321 C Adder 4.16 MW 3.54 MW
942992 AE2-321 E Adder 2.05 MW 1.74 MW
943801 AF1-048 C Adder 1.95 MW 1.66 MW
943802 AF1-048 E Adder 1.3 MW 1.1 MW
958912 AF2-182 E Adder 26.53 MW 22.55 MW
959081 AF2-199 C 50/50 9.73 MW 9.73 MW
959082 AF2-199 E 50/50 4.86 MW 4.86 MW
960582 AF2-349 E Adder 18.17 MW 15.45 MW
960751 AF2-366 C 50/50 6.79 MW 6.79 MW
960752 AF2-366 E 50/50 4.53 MW 4.53 MW
274737 AURORA EC;1P 50/50 3.0 MW 3.0 MW
274738 AURORA EC;3P 50/50 4.7 MW 4.7 MW
274740 AURORA EC;4P 50/50 4.7 MW 4.7 MW
274741 AURORA EC;5P 50/50 1.03 MW 1.03 MW
274742 AURORA EC;6P 50/50 1.03 MW 1.03 MW
274743 AURORA EC;7P 50/50 1.03 MW 1.03 MW
274744 AURORA EC;8P 50/50 1.03 MW 1.03 MW
274745 AURORA EC;9P 50/50 1.03 MW 1.03 MW
274746 AURORA EC;0P 50/50 1.03 MW 1.03 MW
274859 EASYR;U1 E Adder 9.05 MW 7.7 MW
274860 EASYR;U2 E Adder 9.05 MW 7.7 MW
276591 L-013 2 50/50 3.97 MW 3.97 MW
293715 O-029 E Adder 6.51 MW 5.53 MW
293716 O-029 E Adder 3.57 MW 3.03 MW
293717 O-029 E Adder 3.28 MW 2.79 MW
294763 P-046 E Adder 5.79 MW 4.92 MW
939061 AE1-134 2 Adder 1.14 MW 0.96 MW
940502 AE2-035 E Adder 2.08 MW 1.77 MW
946501 AF1-314 C Adder 2.67 MW 2.27 MW
946502 AF1-314 E Adder 12.55 MW 10.67 MW
946661 AF1-330 C Adder 1.01 MW 0.86 MW
946662 AF1-330 E Adder 0.22 MW 0.19 MW
957471 AF2-041 C 50/50 29.18 MW 29.18 MW
957472 AF2-041 E 50/50 14.59 MW 14.59 MW
276678 AD1-016 C Adder 0.47 MW 0.4 MW
276679 AD1-129 C Adder 0.49 MW 0.42 MW
293516 O-009 E Adder 12.59 MW 10.7 MW
274872 LEE DEKAL;1U 50/50 0.72 MW 0.72 MW
290108 LEEDK;1U E 50/50 23.45 MW 23.45 MW
916221 Z1-073 E Adder 6.83 MW 5.8 MW
943121 AE2-341 C 50/50 12.47 MW 12.47 MW
943122 AE2-341 E 50/50 6.12 MW 6.12 MW
943591 AF1-030 C 50/50 8.29 MW 8.29 MW
943592 AF1-030 E 50/50 4.1 MW 4.1 MW
959091 AF2-200 C 50/50 19.45 MW 19.45 MW
959092 AF2-200 E 50/50 12.97 MW 12.97 MW
959101 AF2-201 C Adder 3.69 MW 3.14 MW
959102 AF2-201 E Adder 10.6 MW 9.01 MW
960381 AF2-329 C 50/50 5.23 MW 5.23 MW
960721 AF2-363 C Adder 4.88 MW 4.15 MW
960722 AF2-363 E Adder 3.25 MW 2.77 MW
961011 AF2-392 C Adder 3.1 MW 2.63 MW
961012 AF2-392 E Adder 14.43 MW 12.26 MW
961021 AF2-393 C Adder 4.84 MW 4.12 MW
961031 AF2-394 C Adder 3.52 MW 2.99 MW
966822 AG1-553 E Adder 18.94 MW 16.1 MW
930481 AB1-089 C Adder 45.73 MW 38.87 MW
930482 AB1-089 E Adder 2.08 MW 1.77 MW
938861 AE1-114 C Adder 2.67 MW 2.27 MW
938862 AE1-114 E Adder 9.09 MW 7.73 MW
946152 AF1-280 E Adder 17.69 MW 15.04 MW
946321 AF1-296 C Adder 2.53 MW 2.15 MW
946322 AF1-296 E Adder 11.83 MW 10.05 MW
946671 AF1-331 C Adder 2.22 MW 1.89 MW
962691 AG1-118 C 50/50 22.87 MW 22.87 MW
962692 AG1-118 E 50/50 15.25 MW 15.25 MW
962711 AG1-120 C Adder 7.11 MW 6.05 MW
962712 AG1-120 E Adder 4.74 MW 4.03 MW
965661 AG1-434 C 50/50 5.1 MW 5.1 MW
965662 AG1-434 E 50/50 20.25 MW 20.25 MW
965931 AG1-462 C Adder 10.21 MW 8.68 MW
965932 AG1-462 E Adder 6.8 MW 5.78 MW
961022 AF2-393 E Adder 0.44 MW 0.37 MW
276626 AG1-044 E Adder 0.06 MW 0.05 MW
920272 AA2-123 E Adder 1.44 MW 1.23 MW
276170 Z1-108 E Adder 1.19 MW 1.01 MW
945351 AF1-200 FTIR Adder 247.63 MW 210.49 MW
955972 J1084 External Queue 8.8 MW 8.8 MW
990947 J1432 C External Queue 2.01 MW 2.01 MW
990948 J1432 E External Queue 10.87 MW 10.87 MW
991417 J1934 External Queue -7.6 MW -7.6 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 13.08 MW 13.08 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.54 MW 2.54 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.39 MW 0.39 MW
NY PJM->LTFIMP_NY CLTF 0.21 MW 0.21 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.1 MW 0.1 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.05 MW 0.05 MW
TVA LTFEXP_TVA->PJM CLTF 0.28 MW 0.28 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.17 MW 0.17 MW
MEC LTFEXP_MEC->PJM CLTF 4.73 MW 4.73 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.51 MW 0.51 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.9 MW 0.9 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.5 MW 2.5 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.14 MW 0.14 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_116-45-L11614__SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-L11614__SRT-A
CONTINGENCY 'COMED_P4_116-45-L11614__SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270665 CKT 1   /*BLUE ISL ;RT 345.0 - BLUE ISL ; R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270927 CKT 1   /*BLUE ISL ;RT 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 270667 CKT 1   /*GOODINGS ;2R 345.0 - BLUE ISL ;RT 345.0
END
Breaker AC 105.48 2297.0 STE 2422.86 16.46
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-L11614__SRT-A
CONTINGENCY 'COMED_P4_116-45-L11614__SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270665 CKT 1   /*BLUE ISL ;RT 345.0 - BLUE ISL ; R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270927 CKT 1   /*BLUE ISL ;RT 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 270667 CKT 1   /*GOODINGS ;2R 345.0 - BLUE ISL ;RT 345.0
END
Breaker AC 108.04 2297.0 STE 2481.68 16.57
Topology Case Flowgate Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_116-45-L11614__SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.68 MW 1.43 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C Adder 2.64 MW 2.24 MW
966441 AG1-513 C Adder 0.3 MW 0.26 MW
966442 AG1-513 E Adder 0.46 MW 0.39 MW
290021 O50 E Adder 24.65 MW 20.95 MW
290051 GSG-6; E Adder 6.68 MW 5.68 MW
295109 WESTBROOK E Adder 3.58 MW 3.04 MW
295111 SUBLETTE E Adder 1.74 MW 1.48 MW
918052 AA1-018 E OP Adder 18.79 MW 15.97 MW
933911 AD1-013 C Adder 1.17 MW 1.0 MW
933912 AD1-013 E Adder 1.87 MW 1.59 MW
933932 AD1-016 E Adder 1.01 MW 0.86 MW
934972 AD1-129 E Adder 0.4 MW 0.34 MW
937002 AD2-134 E Adder 6.46 MW 5.49 MW
937312 AD2-172 E Adder 2.32 MW 1.98 MW
937401 AD2-194 1 50/50 1.81 MW 1.81 MW
937411 AD2-194 2 50/50 1.82 MW 1.82 MW
942991 AE2-321 C Adder 5.44 MW 4.62 MW
942992 AE2-321 E Adder 2.68 MW 2.28 MW
943801 AF1-048 C Adder 2.54 MW 2.16 MW
943802 AF1-048 E Adder 1.69 MW 1.44 MW
958481 AF2-142 C Adder 12.96 MW 11.01 MW
958482 AF2-142 E Adder 8.64 MW 7.34 MW
958491 AF2-143 C Adder 13.09 MW 11.13 MW
958492 AF2-143 E Adder 8.73 MW 7.42 MW
958912 AF2-182 E Adder 24.13 MW 20.51 MW
959081 AF2-199 C Adder 4.94 MW 4.2 MW
959082 AF2-199 E Adder 2.47 MW 2.1 MW
959351 AF2-226 C 50/50 5.96 MW 5.96 MW
959352 AF2-226 E 50/50 8.95 MW 8.95 MW
960281 AF2-319 C 50/50 5.96 MW 5.96 MW
960282 AF2-319 E 50/50 8.95 MW 8.95 MW
960582 AF2-349 E Adder 24.31 MW 20.66 MW
274675 JOLIET 29;7U Adder 62.84 MW 53.42 MW
274676 JOLIET 29;8U Adder 62.14 MW 52.82 MW
274682 WAUKEGAN ;7U Adder 27.87 MW 23.69 MW
274683 WAUKEGAN ;8U Adder 30.0 MW 25.5 MW
274728 ELWOOD EC;5P 50/50 4.69 MW 4.69 MW
274729 ELWOOD EC;1P 50/50 4.66 MW 4.66 MW
274730 ELWOOD EC;6P 50/50 4.69 MW 4.69 MW
274731 ELWOOD EC;2P 50/50 4.66 MW 4.66 MW
274732 ELWOOD EC;7P 50/50 4.69 MW 4.69 MW
274733 ELWOOD EC;3P 50/50 4.66 MW 4.66 MW
274734 ELWOOD EC;8P 50/50 4.69 MW 4.69 MW
274736 ELWOOD EC;9P 50/50 4.69 MW 4.69 MW
274859 EASYR;U1 E Adder 8.43 MW 7.17 MW
274860 EASYR;U2 E Adder 8.43 MW 7.17 MW
274861 TOP CROP ;1U 50/50 0.83 MW 0.83 MW
274862 TOP CROP ;2U 50/50 1.59 MW 1.59 MW
276591 L-013 2 Adder 2.3 MW 1.96 MW
293644 O22 E1 50/50 34.27 MW 34.27 MW
293645 O22 E2 50/50 39.25 MW 39.25 MW
293715 O-029 E Adder 7.16 MW 6.09 MW
293716 O-029 E Adder 3.93 MW 3.34 MW
293717 O-029 E Adder 3.61 MW 3.07 MW
293771 O-035 E Adder 5.26 MW 4.47 MW
294401 BSHIL;1U E Adder 6.84 MW 5.82 MW
294410 BSHIL;2U E Adder 6.84 MW 5.82 MW
294763 P-046 E Adder 6.46 MW 5.49 MW
925582 AC1-033 E Adder 7.5 MW 6.38 MW
938511 AE1-070 1 50/50 14.52 MW 14.52 MW
938521 AE1-070 2 50/50 13.21 MW 13.21 MW
939061 AE1-134 2 Adder 0.98 MW 0.83 MW
940502 AE2-035 E Adder 2.32 MW 1.98 MW
946501 AF1-314 C Adder 2.98 MW 2.54 MW
946502 AF1-314 E Adder 14.01 MW 11.91 MW
946661 AF1-330 C Adder 1.33 MW 1.13 MW
946662 AF1-330 E Adder 0.29 MW 0.25 MW
957331 AF2-027 C Adder 1.68 MW 1.43 MW
957332 AF2-027 E Adder 2.52 MW 2.14 MW
957401 AF2-034 C Adder 1.82 MW 1.55 MW
957402 AF2-034 E Adder 1.55 MW 1.32 MW
957471 AF2-041 C Adder 14.82 MW 12.59 MW
957472 AF2-041 E Adder 7.41 MW 6.3 MW
938851 AE1-113 C Adder 10.17 MW 8.64 MW
938852 AE1-113 E Adder 36.05 MW 30.64 MW
934101 AD2-000 1 Adder 5.4 MW 4.59 MW
934111 AD2-000 2 Adder 7.49 MW 6.36 MW
276640 AC1-204 GEN1 50/50 17.35 MW 17.35 MW
276642 AC1-204 GEN2 50/50 17.45 MW 17.45 MW
276678 AD1-016 C Adder 0.62 MW 0.53 MW
276679 AD1-129 C Adder 0.6 MW 0.51 MW
293516 O-009 E Adder 13.85 MW 11.78 MW
916212 CRESCENT ;1U Adder 3.7 MW 3.14 MW
927208 AC1-214 E1 Adder 2.49 MW 2.12 MW
927209 AC1-214 E2 Adder 2.49 MW 2.12 MW
957751 AF2-069 C Adder 0.18 MW 0.15 MW
957752 AF2-069 E Adder 0.59 MW 0.5 MW
990901 L-005 E Adder 10.53 MW 8.95 MW
916221 Z1-073 E Adder 4.71 MW 4.0 MW
934051 AD1-031 C Adder 2.29 MW 1.95 MW
934052 AD1-031 E Adder 3.74 MW 3.17 MW
936291 AD2-038 C Adder 3.84 MW 3.26 MW
936292 AD2-038 E Adder 17.98 MW 15.28 MW
936511 AD2-066 C Adder 6.5 MW 5.52 MW
936512 AD2-066 E Adder 4.33 MW 3.68 MW
942421 AE2-255 C Adder 3.85 MW 3.27 MW
942422 AE2-255 E Adder 11.55 MW 9.82 MW
942651 AE2-281 C Adder 1.02 MW 0.86 MW
942652 AE2-281 E Adder 6.25 MW 5.32 MW
959091 AF2-200 C Adder 9.88 MW 8.39 MW
959092 AF2-200 E Adder 6.58 MW 5.6 MW
959101 AF2-201 C Adder 4.12 MW 3.5 MW
959102 AF2-201 E Adder 11.83 MW 10.06 MW
960721 AF2-363 C Adder 3.77 MW 3.2 MW
960722 AF2-363 E Adder 2.51 MW 2.13 MW
961011 AF2-392 C Adder 2.83 MW 2.4 MW
961012 AF2-392 E Adder 13.15 MW 11.18 MW
961021 AF2-393 C Adder 4.42 MW 3.75 MW
961031 AF2-394 C Adder 3.21 MW 2.73 MW
961651 AG1-005 C Adder 9.41 MW 8.0 MW
961652 AG1-005 E Adder 6.27 MW 5.33 MW
966822 AG1-553 E Adder 22.48 MW 19.11 MW
930481 AB1-089 C Adder 44.37 MW 37.72 MW
930482 AB1-089 E Adder 2.02 MW 1.71 MW
938861 AE1-114 C Adder 2.72 MW 2.31 MW
938862 AE1-114 E Adder 9.29 MW 7.9 MW
939321 AE1-163 C Adder 7.13 MW 6.06 MW
939322 AE1-163 E Adder 43.78 MW 37.21 MW
946152 AF1-280 E Adder 16.09 MW 13.67 MW
946321 AF1-296 C Adder 2.95 MW 2.51 MW
946322 AF1-296 E Adder 13.8 MW 11.73 MW
946671 AF1-331 C Adder 1.52 MW 1.29 MW
962691 AG1-118 C Adder 13.53 MW 11.5 MW
962692 AG1-118 E Adder 9.02 MW 7.67 MW
962711 AG1-120 C Adder 5.49 MW 4.67 MW
962712 AG1-120 E Adder 3.66 MW 3.11 MW
957761 AF2-070 C Adder 0.26 MW 0.22 MW
957762 AF2-070 E Adder 1.24 MW 1.06 MW
965661 AG1-434 C Adder 2.88 MW 2.45 MW
965662 AG1-434 E Adder 11.44 MW 9.72 MW
965671 AG1-435 C Adder 2.93 MW 2.49 MW
965672 AG1-435 E Adder 9.55 MW 8.12 MW
965931 AG1-462 C Adder 12.11 MW 10.29 MW
965932 AG1-462 E Adder 8.07 MW 6.86 MW
961022 AF2-393 E Adder 0.4 MW 0.34 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
920272 AA2-123 E Adder 1.91 MW 1.62 MW
276170 Z1-108 E Adder 1.93 MW 1.64 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 56.79 MW 56.79 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.96 MW 10.96 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.15 MW 1.15 MW
NY PJM->LTFIMP_NY CLTF 0.62 MW 0.62 MW
WEC LTFEXP_WEC->PJM CLTF 2.67 MW 2.67 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.23 MW 0.23 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.11 MW 0.11 MW
TVA LTFEXP_TVA->PJM CLTF 1.16 MW 1.16 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.37 MW 0.37 MW
MEC LTFEXP_MEC->PJM CLTF 9.98 MW 9.98 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.06 MW 1.06 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.82 MW 2.82 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.38 MW 7.38 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.36 MW 0.36 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4_111-45-L11120__SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_111-45-L11120__SRT-A
CONTINGENCY 'COMED_P4_111-45-L11120__SRT-A'
 DISCONNECT BUS 270733                                 /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183                                 /*ELECT JCT;3M 138.0
 MOVE 100 PERCENT LOAD FROM BUS 270749 TO BUS 270751   /*ESS W407M; R 345.0 - ESS W407M;9T 345.0
 TRIP BRANCH FROM BUS 270733 TO BUS 270747 CKT 1       /*ELECT JCT;3R 345.0 - ESS W407K;0T 345.0
 TRIP BRANCH FROM BUS 270747 TO BUS 270753 CKT 1       /*ESS W407K;0T 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270749 CKT 1       /*ESS W407M;0T 345.0 - ESS W407M; R 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270813 CKT 1       /*ESS W407M;0T 345.0 - LOMBARD  ; R 345.0
END
Breaker AC 118.28 1568.0 STE 1854.57 30.13
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_111-45-L11120__SRT-A
CONTINGENCY 'COMED_P4_111-45-L11120__SRT-A'
 DISCONNECT BUS 270733                                 /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183                                 /*ELECT JCT;3M 138.0
 MOVE 100 PERCENT LOAD FROM BUS 270749 TO BUS 270751   /*ESS W407M; R 345.0 - ESS W407M;9T 345.0
 TRIP BRANCH FROM BUS 270733 TO BUS 270747 CKT 1       /*ELECT JCT;3R 345.0 - ESS W407K;0T 345.0
 TRIP BRANCH FROM BUS 270747 TO BUS 270753 CKT 1       /*ESS W407K;0T 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270749 CKT 1       /*ESS W407M;0T 345.0 - ESS W407M; R 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270813 CKT 1       /*ESS W407M;0T 345.0 - LOMBARD  ; R 345.0
END
Breaker AC 116.16 1568.0 STE 1821.44 30.1
Topology Case Flowgate Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4_111-45-L11120__SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.16 MW 1.83 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C 50/50 6.01 MW 6.01 MW
962782 AG1-127 E 50/50 4.0 MW 4.0 MW
966441 AG1-513 C 50/50 0.41 MW 0.41 MW
966442 AG1-513 E 50/50 0.61 MW 0.61 MW
290051 GSG-6; E Adder 8.55 MW 7.27 MW
295109 WESTBROOK E Adder 4.58 MW 3.89 MW
295111 SUBLETTE E Adder 2.23 MW 1.89 MW
933911 AD1-013 C Adder 1.51 MW 1.29 MW
933912 AD1-013 E Adder 2.42 MW 2.06 MW
934972 AD1-129 E Adder 0.25 MW 0.21 MW
937002 AD2-134 E Adder 8.27 MW 7.03 MW
937312 AD2-172 E Adder 1.69 MW 1.44 MW
958912 AF2-182 E Adder 22.97 MW 19.53 MW
959081 AF2-199 C 50/50 9.04 MW 9.04 MW
959082 AF2-199 E 50/50 4.52 MW 4.52 MW
960751 AF2-366 C 50/50 6.0 MW 6.0 MW
960752 AF2-366 E 50/50 4.0 MW 4.0 MW
274738 AURORA EC;3P 50/50 4.29 MW 4.29 MW
274740 AURORA EC;4P 50/50 4.29 MW 4.29 MW
274741 AURORA EC;5P 50/50 0.79 MW 0.79 MW
274742 AURORA EC;6P 50/50 0.79 MW 0.79 MW
274743 AURORA EC;7P 50/50 0.79 MW 0.79 MW
274744 AURORA EC;8P 50/50 0.79 MW 0.79 MW
274745 AURORA EC;9P 50/50 0.79 MW 0.79 MW
274746 AURORA EC;0P 50/50 0.79 MW 0.79 MW
274859 EASYR;U1 E Adder 7.76 MW 6.59 MW
274860 EASYR;U2 E Adder 7.76 MW 6.59 MW
276591 L-013 2 50/50 3.3 MW 3.3 MW
293715 O-029 E Adder 5.76 MW 4.9 MW
293716 O-029 E Adder 3.16 MW 2.69 MW
293717 O-029 E Adder 2.9 MW 2.47 MW
294763 P-046 E Adder 4.7 MW 3.99 MW
939061 AE1-134 2 Adder 1.0 MW 0.85 MW
940502 AE2-035 E Adder 1.69 MW 1.44 MW
946501 AF1-314 C Adder 2.17 MW 1.84 MW
946502 AF1-314 E Adder 10.19 MW 8.66 MW
957471 AF2-041 C 50/50 27.11 MW 27.11 MW
957472 AF2-041 E 50/50 13.56 MW 13.56 MW
276679 AD1-129 C Adder 0.38 MW 0.32 MW
293516 O-009 E Adder 11.14 MW 9.47 MW
274872 LEE DEKAL;1U 50/50 0.64 MW 0.64 MW
290108 LEEDK;1U E 50/50 20.77 MW 20.77 MW
916221 Z1-073 E Adder 6.03 MW 5.12 MW
943121 AE2-341 C 50/50 11.21 MW 11.21 MW
943122 AE2-341 E 50/50 5.5 MW 5.5 MW
943591 AF1-030 C 50/50 7.45 MW 7.45 MW
943592 AF1-030 E 50/50 3.69 MW 3.69 MW
959091 AF2-200 C 50/50 18.08 MW 18.08 MW
959092 AF2-200 E 50/50 12.05 MW 12.05 MW
959101 AF2-201 C Adder 3.0 MW 2.55 MW
959102 AF2-201 E Adder 8.6 MW 7.31 MW
960381 AF2-329 C 50/50 4.7 MW 4.7 MW
960721 AF2-363 C Adder 4.18 MW 3.55 MW
960722 AF2-363 E Adder 2.79 MW 2.37 MW
961011 AF2-392 C Adder 2.72 MW 2.32 MW
961012 AF2-392 E Adder 12.68 MW 10.78 MW
961021 AF2-393 C Adder 4.26 MW 3.62 MW
961031 AF2-394 C Adder 3.1 MW 2.63 MW
966822 AG1-553 E Adder 16.59 MW 14.1 MW
930481 AB1-089 C Adder 36.72 MW 31.21 MW
930482 AB1-089 E Adder 1.67 MW 1.42 MW
938861 AE1-114 C Adder 2.24 MW 1.91 MW
938862 AE1-114 E Adder 7.64 MW 6.5 MW
946152 AF1-280 E Adder 15.32 MW 13.02 MW
946321 AF1-296 C Adder 2.2 MW 1.87 MW
946322 AF1-296 E Adder 10.32 MW 8.77 MW
946671 AF1-331 C Adder 1.96 MW 1.67 MW
962691 AG1-118 C 50/50 20.34 MW 20.34 MW
962692 AG1-118 E 50/50 13.56 MW 13.56 MW
962711 AG1-120 C Adder 6.09 MW 5.18 MW
962712 AG1-120 E Adder 4.06 MW 3.45 MW
965661 AG1-434 C 50/50 4.7 MW 4.7 MW
965662 AG1-434 E 50/50 18.68 MW 18.68 MW
965931 AG1-462 C Adder 8.94 MW 7.6 MW
965932 AG1-462 E Adder 5.96 MW 5.06 MW
961022 AF2-393 E Adder 0.39 MW 0.33 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
945351 AF1-200 FTIR Adder 234.99 MW 199.74 MW
955972 J1084 External Queue 8.02 MW 8.02 MW
991417 J1934 External Queue -8.86 MW -8.86 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 5.18 MW 5.18 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.42 MW 2.42 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.33 MW 0.33 MW
NY PJM->LTFIMP_NY CLTF 0.18 MW 0.18 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.08 MW 0.08 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.04 MW 0.04 MW
TVA LTFEXP_TVA->PJM CLTF 0.27 MW 0.27 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.13 MW 0.13 MW
MEC LTFEXP_MEC->PJM CLTF 3.88 MW 3.88 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.4 MW 0.4 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.78 MW 0.78 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.13 MW 2.13 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.12 MW 0.12 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4_120-45-L12002__SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_120-45-L12002__SRT-A
CONTINGENCY 'COMED_P4_120-45-L12002__SRT-A'
 DISCONNECT BUS 275198                             /*LOMBARD  ;2M 138.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270753 CKT 1   /*LOMBARD  ; R 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270781 CKT 1   /*LOMBARD  ; R 345.0 - ITASCA   ; R 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270809 CKT 1   /*LOMBARD  ; R 345.0 - LISLE    ; R 345.0
 TRIP BRANCH FROM BUS 275191 TO BUS 270781 CKT 1   /*ITASCA   ;2M 138.0 - ITASCA   ; R 345.0
 TRIP BRANCH FROM BUS 275191 TO BUS 271735 CKT 1   /*ITASCA   ;2M 138.0 - ITASCA   ; R 138.0
 TRIP BRANCH FROM BUS 275191 TO BUS 275291 CKT 1   /*ITASCA   ;2M 138.0 - ITASCA   ;2C  34.5
END
Breaker AC 118.84 1568.0 STE 1863.47 30.55
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_120-45-L12002__SRT-A
CONTINGENCY 'COMED_P4_120-45-L12002__SRT-A'
 DISCONNECT BUS 275198                             /*LOMBARD  ;2M 138.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270753 CKT 1   /*LOMBARD  ; R 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270781 CKT 1   /*LOMBARD  ; R 345.0 - ITASCA   ; R 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270809 CKT 1   /*LOMBARD  ; R 345.0 - LISLE    ; R 345.0
 TRIP BRANCH FROM BUS 275191 TO BUS 270781 CKT 1   /*ITASCA   ;2M 138.0 - ITASCA   ; R 345.0
 TRIP BRANCH FROM BUS 275191 TO BUS 271735 CKT 1   /*ITASCA   ;2M 138.0 - ITASCA   ; R 138.0
 TRIP BRANCH FROM BUS 275191 TO BUS 275291 CKT 1   /*ITASCA   ;2M 138.0 - ITASCA   ;2C  34.5
END
Breaker AC 115.92 1568.0 STE 1817.66 30.52
Topology Case Flowgate Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4_120-45-L12002__SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.2 MW 1.87 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C 50/50 6.11 MW 6.11 MW
962782 AG1-127 E 50/50 4.06 MW 4.06 MW
966441 AG1-513 C Adder 0.4 MW 0.34 MW
966442 AG1-513 E Adder 0.6 MW 0.51 MW
290051 GSG-6; E Adder 8.72 MW 7.41 MW
295109 WESTBROOK E Adder 4.67 MW 3.97 MW
295111 SUBLETTE E Adder 2.27 MW 1.93 MW
933911 AD1-013 C 50/50 1.54 MW 1.54 MW
933912 AD1-013 E 50/50 2.46 MW 2.46 MW
934972 AD1-129 E Adder 0.28 MW 0.23 MW
937002 AD2-134 E Adder 8.43 MW 7.17 MW
937312 AD2-172 E Adder 1.81 MW 1.54 MW
942991 AE2-321 C Adder 3.41 MW 2.9 MW
942992 AE2-321 E Adder 1.68 MW 1.43 MW
943801 AF1-048 C Adder 1.59 MW 1.35 MW
943802 AF1-048 E Adder 1.06 MW 0.9 MW
958912 AF2-182 E Adder 23.97 MW 20.37 MW
959081 AF2-199 C 50/50 9.16 MW 9.16 MW
959082 AF2-199 E 50/50 4.58 MW 4.58 MW
960582 AF2-349 E Adder 15.0 MW 12.75 MW
960751 AF2-366 C 50/50 6.09 MW 6.09 MW
960752 AF2-366 E 50/50 4.06 MW 4.06 MW
274738 AURORA EC;3P 50/50 4.33 MW 4.33 MW
274740 AURORA EC;4P 50/50 4.33 MW 4.33 MW
274859 EASYR;U1 E Adder 8.12 MW 6.91 MW
274860 EASYR;U2 E Adder 8.12 MW 6.91 MW
276591 L-013 2 50/50 3.35 MW 3.35 MW
293715 O-029 E Adder 5.98 MW 5.08 MW
293716 O-029 E Adder 3.28 MW 2.79 MW
293717 O-029 E Adder 3.01 MW 2.56 MW
294763 P-046 E Adder 5.03 MW 4.27 MW
939061 AE1-134 2 Adder 1.04 MW 0.88 MW
940502 AE2-035 E Adder 1.81 MW 1.54 MW
946501 AF1-314 C Adder 2.32 MW 1.97 MW
946502 AF1-314 E Adder 10.91 MW 9.27 MW
946661 AF1-330 C Adder 0.82 MW 0.7 MW
946662 AF1-330 E Adder 0.18 MW 0.15 MW
957471 AF2-041 C 50/50 27.49 MW 27.49 MW
957472 AF2-041 E 50/50 13.75 MW 13.75 MW
276679 AD1-129 C Adder 0.41 MW 0.35 MW
293516 O-009 E Adder 11.56 MW 9.82 MW
274872 LEE DEKAL;1U 50/50 0.65 MW 0.65 MW
290108 LEEDK;1U E 50/50 21.07 MW 21.07 MW
916221 Z1-073 E Adder 6.14 MW 5.22 MW
943121 AE2-341 C 50/50 11.12 MW 11.12 MW
943122 AE2-341 E 50/50 5.46 MW 5.46 MW
943591 AF1-030 C 50/50 7.4 MW 7.4 MW
943592 AF1-030 E 50/50 3.66 MW 3.66 MW
959091 AF2-200 C 50/50 18.33 MW 18.33 MW
959092 AF2-200 E 50/50 12.22 MW 12.22 MW
959101 AF2-201 C Adder 3.21 MW 2.73 MW
959102 AF2-201 E Adder 9.21 MW 7.83 MW
960381 AF2-329 C 50/50 4.67 MW 4.67 MW
960721 AF2-363 C Adder 4.32 MW 3.67 MW
960722 AF2-363 E Adder 2.88 MW 2.45 MW
961011 AF2-392 C Adder 2.83 MW 2.4 MW
961012 AF2-392 E Adder 13.15 MW 11.18 MW
961021 AF2-393 C Adder 4.41 MW 3.75 MW
961031 AF2-394 C Adder 3.21 MW 2.73 MW
966822 AG1-553 E Adder 17.33 MW 14.73 MW
930481 AB1-089 C Adder 39.26 MW 33.37 MW
930482 AB1-089 E Adder 1.78 MW 1.52 MW
938861 AE1-114 C Adder 2.36 MW 2.01 MW
938862 AE1-114 E Adder 8.06 MW 6.85 MW
946152 AF1-280 E Adder 15.98 MW 13.58 MW
946321 AF1-296 C Adder 2.3 MW 1.96 MW
946322 AF1-296 E Adder 10.79 MW 9.17 MW
946671 AF1-331 C 50/50 2.0 MW 2.0 MW
962691 AG1-118 C 50/50 20.59 MW 20.59 MW
962692 AG1-118 E 50/50 13.73 MW 13.73 MW
962711 AG1-120 C Adder 6.29 MW 5.35 MW
962712 AG1-120 E Adder 4.19 MW 3.56 MW
965661 AG1-434 C 50/50 4.78 MW 4.78 MW
965662 AG1-434 E 50/50 19.0 MW 19.0 MW
965931 AG1-462 C Adder 9.34 MW 7.94 MW
965932 AG1-462 E Adder 6.23 MW 5.29 MW
961022 AF2-393 E Adder 0.4 MW 0.34 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
920272 AA2-123 E Adder 1.18 MW 1.0 MW
945351 AF1-200 FTIR Adder 225.12 MW 191.35 MW
955972 J1084 External Queue 8.18 MW 8.18 MW
991417 J1934 External Queue -8.03 MW -8.03 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 8.84 MW 8.84 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.71 MW 2.71 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.35 MW 0.35 MW
NY PJM->LTFIMP_NY CLTF 0.19 MW 0.19 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.08 MW 0.08 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.04 MW 0.04 MW
TVA LTFEXP_TVA->PJM CLTF 0.3 MW 0.3 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.14 MW 0.14 MW
MEC LTFEXP_MEC->PJM CLTF 4.24 MW 4.24 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.42 MW 0.42 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.88 MW 0.88 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.25 MW 2.25 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.12 MW 0.12 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4_120-38-TR82____SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_120-38-TR82____SRT-A
CONTINGENCY 'COMED_P4_120-38-TR82____SRT-A'
 CLOSE LINE FROM BUS 272252 TO BUS 272253 CKT Z1    /*PL HILL  ; B 138.0 - PL HILL  ; R 138.0
 CLOSE LINE FROM BUS 273236 TO BUS 273237 CKT Z1    /*LOMBARD  ;13  13.2 - LOMBARD  ;46  13.2
 DISCONNECT BUS 275198                              /*LOMBARD  ;2M 138.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270753 CKT 1    /*LOMBARD  ; R 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270781 CKT 1    /*LOMBARD  ; R 345.0 - ITASCA   ; R 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270809 CKT 1    /*LOMBARD  ; R 345.0 - LISLE    ; R 345.0
 TRIP BRANCH FROM BUS 271923 TO BUS 271569 CKT 1    /*LOMBARD  ; R 138.0 - GRACE    ; R 138.0
 TRIP BRANCH FROM BUS 271923 TO BUS 271925 CKT Z1   /*LOMBARD  ; R 138.0 - LOMBARD  ;2R 138.0
 TRIP BRANCH FROM BUS 271923 TO BUS 272253 CKT 1    /*LOMBARD  ; R 138.0 - PL HILL  ; R 138.0
 TRIP BRANCH FROM BUS 271923 TO BUS 273237 CKT 2    /*LOMBARD  ; R 138.0 - LOMBARD  ;46  13.2
 TRIP BRANCH FROM BUS 271925 TO BUS 275198 CKT 1    /*LOMBARD  ;2R 138.0 - LOMBARD  ;2M 138.0
END
Breaker AC 118.76 1568.0 STE 1862.12 30.55
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_120-38-TR82____SRT-A
CONTINGENCY 'COMED_P4_120-38-TR82____SRT-A'
 CLOSE LINE FROM BUS 272252 TO BUS 272253 CKT Z1    /*PL HILL  ; B 138.0 - PL HILL  ; R 138.0
 CLOSE LINE FROM BUS 273236 TO BUS 273237 CKT Z1    /*LOMBARD  ;13  13.2 - LOMBARD  ;46  13.2
 DISCONNECT BUS 275198                              /*LOMBARD  ;2M 138.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270753 CKT 1    /*LOMBARD  ; R 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270781 CKT 1    /*LOMBARD  ; R 345.0 - ITASCA   ; R 345.0
 TRIP BRANCH FROM BUS 270813 TO BUS 270809 CKT 1    /*LOMBARD  ; R 345.0 - LISLE    ; R 345.0
 TRIP BRANCH FROM BUS 271923 TO BUS 271569 CKT 1    /*LOMBARD  ; R 138.0 - GRACE    ; R 138.0
 TRIP BRANCH FROM BUS 271923 TO BUS 271925 CKT Z1   /*LOMBARD  ; R 138.0 - LOMBARD  ;2R 138.0
 TRIP BRANCH FROM BUS 271923 TO BUS 272253 CKT 1    /*LOMBARD  ; R 138.0 - PL HILL  ; R 138.0
 TRIP BRANCH FROM BUS 271923 TO BUS 273237 CKT 2    /*LOMBARD  ; R 138.0 - LOMBARD  ;46  13.2
 TRIP BRANCH FROM BUS 271925 TO BUS 275198 CKT 1    /*LOMBARD  ;2R 138.0 - LOMBARD  ;2M 138.0
END
Breaker AC 115.77 1568.0 STE 1815.21 30.52
Topology Case Flowgate Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4_120-38-TR82____SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 2.2 MW 2.2 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C 50/50 6.11 MW 6.11 MW
962782 AG1-127 E 50/50 4.07 MW 4.07 MW
966441 AG1-513 C Adder 0.4 MW 0.34 MW
966442 AG1-513 E Adder 0.6 MW 0.51 MW
290051 GSG-6; E Adder 8.72 MW 7.41 MW
295109 WESTBROOK E Adder 4.67 MW 3.97 MW
295111 SUBLETTE E Adder 2.27 MW 1.93 MW
933911 AD1-013 C 50/50 1.54 MW 1.54 MW
933912 AD1-013 E 50/50 2.46 MW 2.46 MW
933932 AD1-016 E Adder 0.62 MW 0.53 MW
934972 AD1-129 E Adder 0.28 MW 0.23 MW
937002 AD2-134 E Adder 8.43 MW 7.17 MW
937312 AD2-172 E Adder 1.81 MW 1.54 MW
942991 AE2-321 C Adder 3.41 MW 2.9 MW
942992 AE2-321 E Adder 1.68 MW 1.43 MW
943801 AF1-048 C Adder 1.59 MW 1.35 MW
943802 AF1-048 E Adder 1.06 MW 0.9 MW
958912 AF2-182 E Adder 23.97 MW 20.38 MW
959081 AF2-199 C 50/50 9.16 MW 9.16 MW
959082 AF2-199 E 50/50 4.58 MW 4.58 MW
960582 AF2-349 E Adder 15.01 MW 12.76 MW
960751 AF2-366 C 50/50 6.09 MW 6.09 MW
960752 AF2-366 E 50/50 4.06 MW 4.06 MW
274738 AURORA EC;3P 50/50 4.33 MW 4.33 MW
274740 AURORA EC;4P 50/50 4.33 MW 4.33 MW
274859 EASYR;U1 E Adder 8.13 MW 6.91 MW
274860 EASYR;U2 E Adder 8.13 MW 6.91 MW
276591 L-013 2 50/50 3.35 MW 3.35 MW
293715 O-029 E Adder 5.98 MW 5.08 MW
293716 O-029 E Adder 3.28 MW 2.79 MW
293717 O-029 E Adder 3.01 MW 2.56 MW
294763 P-046 E Adder 5.03 MW 4.28 MW
939061 AE1-134 2 Adder 1.04 MW 0.88 MW
940502 AE2-035 E Adder 1.81 MW 1.54 MW
946501 AF1-314 C Adder 2.32 MW 1.97 MW
946502 AF1-314 E Adder 10.91 MW 9.27 MW
946661 AF1-330 C Adder 0.82 MW 0.7 MW
946662 AF1-330 E Adder 0.18 MW 0.15 MW
957471 AF2-041 C 50/50 27.49 MW 27.49 MW
957472 AF2-041 E 50/50 13.75 MW 13.75 MW
276678 AD1-016 C Adder 0.38 MW 0.32 MW
276679 AD1-129 C Adder 0.41 MW 0.35 MW
293516 O-009 E Adder 11.56 MW 9.82 MW
274872 LEE DEKAL;1U 50/50 0.65 MW 0.65 MW
290108 LEEDK;1U E 50/50 21.08 MW 21.08 MW
916221 Z1-073 E Adder 6.14 MW 5.22 MW
943121 AE2-341 C 50/50 11.13 MW 11.13 MW
943122 AE2-341 E 50/50 5.46 MW 5.46 MW
943591 AF1-030 C 50/50 7.4 MW 7.4 MW
943592 AF1-030 E 50/50 3.66 MW 3.66 MW
959091 AF2-200 C 50/50 18.33 MW 18.33 MW
959092 AF2-200 E 50/50 12.22 MW 12.22 MW
959101 AF2-201 C Adder 3.21 MW 2.73 MW
959102 AF2-201 E Adder 9.21 MW 7.83 MW
960381 AF2-329 C 50/50 4.67 MW 4.67 MW
960721 AF2-363 C Adder 4.32 MW 3.67 MW
960722 AF2-363 E Adder 2.88 MW 2.45 MW
961011 AF2-392 C Adder 2.83 MW 2.4 MW
961012 AF2-392 E Adder 13.15 MW 11.18 MW
961021 AF2-393 C Adder 4.42 MW 3.75 MW
961031 AF2-394 C Adder 3.21 MW 2.73 MW
966822 AG1-553 E Adder 17.34 MW 14.74 MW
930481 AB1-089 C Adder 39.27 MW 33.38 MW
930482 AB1-089 E Adder 1.78 MW 1.52 MW
938861 AE1-114 C Adder 2.36 MW 2.01 MW
938862 AE1-114 E Adder 8.06 MW 6.86 MW
946152 AF1-280 E Adder 15.98 MW 13.59 MW
946321 AF1-296 C Adder 2.31 MW 1.96 MW
946322 AF1-296 E Adder 10.79 MW 9.18 MW
946671 AF1-331 C 50/50 2.0 MW 2.0 MW
962691 AG1-118 C 50/50 20.59 MW 20.59 MW
962692 AG1-118 E 50/50 13.73 MW 13.73 MW
962711 AG1-120 C Adder 6.29 MW 5.35 MW
962712 AG1-120 E Adder 4.2 MW 3.57 MW
965661 AG1-434 C 50/50 4.79 MW 4.79 MW
965662 AG1-434 E 50/50 19.0 MW 19.0 MW
965931 AG1-462 C Adder 9.34 MW 7.94 MW
965932 AG1-462 E Adder 6.23 MW 5.29 MW
961022 AF2-393 E Adder 0.4 MW 0.34 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
920272 AA2-123 E Adder 1.18 MW 1.0 MW
945351 AF1-200 FTIR Adder 225.14 MW 191.37 MW
955972 J1084 External Queue 8.18 MW 8.18 MW
991417 J1934 External Queue -8.02 MW -8.02 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 8.87 MW 8.87 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.71 MW 2.71 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.35 MW 0.35 MW
NY PJM->LTFIMP_NY CLTF 0.19 MW 0.19 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.08 MW 0.08 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.04 MW 0.04 MW
TVA LTFEXP_TVA->PJM CLTF 0.3 MW 0.3 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.14 MW 0.14 MW
MEC LTFEXP_MEC->PJM CLTF 4.24 MW 4.24 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.42 MW 0.42 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.88 MW 0.88 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.26 MW 2.26 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.12 MW 0.12 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_116-45-TR82____SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-TR82____SRT-A
CONTINGENCY 'COMED_P4_116-45-TR82____SRT-A'
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 271565 TO BUS 275324 CKT 1  /*GOODINGS ;2R 345.0 - GOODINGS ; R 138.0 - GOODINGS ;2C  34.5
END
Breaker AC 102.37 2297.0 STE 2351.35 16.47
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-TR82____SRT-A
CONTINGENCY 'COMED_P4_116-45-TR82____SRT-A'
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 271565 TO BUS 275324 CKT 1  /*GOODINGS ;2R 345.0 - GOODINGS ; R 138.0 - GOODINGS ;2C  34.5
END
Breaker AC 104.72 2297.0 STE 2405.37 16.54
Topology Case Flowgate Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_116-45-TR82____SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.68 MW 1.43 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C Adder 2.64 MW 2.24 MW
966441 AG1-513 C Adder 0.3 MW 0.26 MW
966442 AG1-513 E Adder 0.46 MW 0.39 MW
290021 O50 E Adder 24.69 MW 20.99 MW
290051 GSG-6; E Adder 6.69 MW 5.68 MW
295109 WESTBROOK E Adder 3.58 MW 3.04 MW
295111 SUBLETTE E Adder 1.74 MW 1.48 MW
918052 AA1-018 E OP Adder 18.8 MW 15.98 MW
933911 AD1-013 C Adder 1.17 MW 1.0 MW
933912 AD1-013 E Adder 1.88 MW 1.59 MW
933932 AD1-016 E Adder 1.01 MW 0.86 MW
934972 AD1-129 E Adder 0.4 MW 0.34 MW
937002 AD2-134 E Adder 6.47 MW 5.5 MW
937312 AD2-172 E Adder 2.33 MW 1.98 MW
937401 AD2-194 1 50/50 1.82 MW 1.82 MW
937411 AD2-194 2 50/50 1.83 MW 1.83 MW
942991 AE2-321 C Adder 5.45 MW 4.63 MW
942992 AE2-321 E Adder 2.69 MW 2.28 MW
943801 AF1-048 C Adder 2.55 MW 2.17 MW
943802 AF1-048 E Adder 1.7 MW 1.44 MW
958481 AF2-142 C Adder 12.97 MW 11.02 MW
958482 AF2-142 E Adder 8.65 MW 7.35 MW
958491 AF2-143 C Adder 13.1 MW 11.14 MW
958492 AF2-143 E Adder 8.73 MW 7.42 MW
958912 AF2-182 E Adder 24.16 MW 20.53 MW
959081 AF2-199 C Adder 4.94 MW 4.2 MW
959082 AF2-199 E Adder 2.47 MW 2.1 MW
959351 AF2-226 C 50/50 5.98 MW 5.98 MW
959352 AF2-226 E 50/50 8.97 MW 8.97 MW
960281 AF2-319 C 50/50 5.98 MW 5.98 MW
960282 AF2-319 E 50/50 8.97 MW 8.97 MW
960582 AF2-349 E Adder 24.38 MW 20.72 MW
274675 JOLIET 29;7U Adder 63.51 MW 53.98 MW
274676 JOLIET 29;8U Adder 62.79 MW 53.37 MW
274682 WAUKEGAN ;7U Adder 28.05 MW 23.84 MW
274683 WAUKEGAN ;8U Adder 30.19 MW 25.66 MW
274728 ELWOOD EC;5P 50/50 4.7 MW 4.7 MW
274729 ELWOOD EC;1P 50/50 4.67 MW 4.67 MW
274730 ELWOOD EC;6P 50/50 4.7 MW 4.7 MW
274731 ELWOOD EC;2P 50/50 4.67 MW 4.67 MW
274732 ELWOOD EC;7P 50/50 4.7 MW 4.7 MW
274733 ELWOOD EC;3P 50/50 4.67 MW 4.67 MW
274734 ELWOOD EC;8P 50/50 4.7 MW 4.7 MW
274736 ELWOOD EC;9P 50/50 4.7 MW 4.7 MW
274859 EASYR;U1 E Adder 8.44 MW 7.17 MW
274860 EASYR;U2 E Adder 8.44 MW 7.17 MW
274861 TOP CROP ;1U 50/50 0.83 MW 0.83 MW
274862 TOP CROP ;2U 50/50 1.59 MW 1.59 MW
276591 L-013 2 Adder 2.31 MW 1.96 MW
293644 O22 E1 50/50 34.34 MW 34.34 MW
293645 O22 E2 50/50 39.33 MW 39.33 MW
293715 O-029 E Adder 7.16 MW 6.09 MW
293716 O-029 E Adder 3.93 MW 3.34 MW
293717 O-029 E Adder 3.61 MW 3.07 MW
293771 O-035 E Adder 5.24 MW 4.46 MW
294401 BSHIL;1U E Adder 6.83 MW 5.8 MW
294410 BSHIL;2U E Adder 6.83 MW 5.8 MW
294763 P-046 E Adder 6.47 MW 5.5 MW
925582 AC1-033 E Adder 7.49 MW 6.36 MW
938511 AE1-070 1 50/50 14.54 MW 14.54 MW
938521 AE1-070 2 50/50 13.23 MW 13.23 MW
939061 AE1-134 2 Adder 0.98 MW 0.83 MW
940502 AE2-035 E Adder 2.33 MW 1.98 MW
946501 AF1-314 C Adder 2.99 MW 2.54 MW
946502 AF1-314 E Adder 14.04 MW 11.93 MW
946661 AF1-330 C Adder 1.34 MW 1.14 MW
946662 AF1-330 E Adder 0.29 MW 0.25 MW
957331 AF2-027 C Adder 1.69 MW 1.44 MW
957332 AF2-027 E Adder 2.54 MW 2.15 MW
957401 AF2-034 C Adder 1.83 MW 1.56 MW
957402 AF2-034 E Adder 1.56 MW 1.32 MW
957471 AF2-041 C Adder 14.83 MW 12.6 MW
957472 AF2-041 E Adder 7.41 MW 6.3 MW
938851 AE1-113 C Adder 10.19 MW 8.66 MW
938852 AE1-113 E Adder 36.11 MW 30.7 MW
934101 AD2-000 1 Adder 5.38 MW 4.57 MW
934111 AD2-000 2 Adder 7.51 MW 6.38 MW
276640 AC1-204 GEN1 50/50 17.38 MW 17.38 MW
276642 AC1-204 GEN2 50/50 17.48 MW 17.48 MW
276678 AD1-016 C Adder 0.62 MW 0.53 MW
276679 AD1-129 C Adder 0.61 MW 0.52 MW
293516 O-009 E Adder 13.85 MW 11.77 MW
916212 CRESCENT ;1U Adder 3.68 MW 3.13 MW
927208 AC1-214 E1 Adder 2.49 MW 2.11 MW
927209 AC1-214 E2 Adder 2.49 MW 2.11 MW
957751 AF2-069 C Adder 0.18 MW 0.15 MW
957752 AF2-069 E Adder 0.58 MW 0.5 MW
990901 L-005 E Adder 10.5 MW 8.93 MW
916221 Z1-073 E Adder 4.71 MW 4.01 MW
934051 AD1-031 C Adder 2.28 MW 1.94 MW
934052 AD1-031 E Adder 3.73 MW 3.17 MW
936291 AD2-038 C Adder 3.84 MW 3.27 MW
936292 AD2-038 E Adder 17.99 MW 15.29 MW
936511 AD2-066 C Adder 6.52 MW 5.54 MW
936512 AD2-066 E Adder 4.34 MW 3.69 MW
942421 AE2-255 C Adder 3.86 MW 3.28 MW
942422 AE2-255 E Adder 11.57 MW 9.84 MW
942651 AE2-281 C Adder 1.02 MW 0.87 MW
942652 AE2-281 E Adder 6.26 MW 5.32 MW
959091 AF2-200 C Adder 9.88 MW 8.4 MW
959092 AF2-200 E Adder 6.59 MW 5.6 MW
959101 AF2-201 C Adder 4.13 MW 3.51 MW
959102 AF2-201 E Adder 11.85 MW 10.07 MW
960721 AF2-363 C Adder 3.77 MW 3.21 MW
960722 AF2-363 E Adder 2.52 MW 2.14 MW
961011 AF2-392 C Adder 2.83 MW 2.4 MW
961012 AF2-392 E Adder 13.16 MW 11.18 MW
961021 AF2-393 C Adder 4.42 MW 3.75 MW
961031 AF2-394 C Adder 3.21 MW 2.73 MW
961651 AG1-005 C Adder 9.37 MW 7.97 MW
961652 AG1-005 E Adder 6.25 MW 5.31 MW
966822 AG1-553 E Adder 22.48 MW 19.11 MW
930481 AB1-089 C Adder 44.46 MW 37.79 MW
930482 AB1-089 E Adder 2.02 MW 1.72 MW
938861 AE1-114 C Adder 2.73 MW 2.32 MW
938862 AE1-114 E Adder 9.31 MW 7.91 MW
939321 AE1-163 C Adder 7.13 MW 6.06 MW
939322 AE1-163 E Adder 43.82 MW 37.24 MW
946152 AF1-280 E Adder 16.1 MW 13.69 MW
946321 AF1-296 C Adder 2.95 MW 2.51 MW
946322 AF1-296 E Adder 13.81 MW 11.74 MW
946671 AF1-331 C Adder 1.52 MW 1.3 MW
962691 AG1-118 C Adder 13.53 MW 11.5 MW
962692 AG1-118 E Adder 9.02 MW 7.67 MW
962711 AG1-120 C Adder 5.5 MW 4.67 MW
962712 AG1-120 E Adder 3.66 MW 3.12 MW
957761 AF2-070 C Adder 0.26 MW 0.22 MW
957762 AF2-070 E Adder 1.24 MW 1.05 MW
965661 AG1-434 C Adder 2.88 MW 2.45 MW
965662 AG1-434 E Adder 11.45 MW 9.73 MW
965671 AG1-435 C Adder 2.92 MW 2.48 MW
965672 AG1-435 E Adder 9.52 MW 8.09 MW
965931 AG1-462 C Adder 12.11 MW 10.29 MW
965932 AG1-462 E Adder 8.07 MW 6.86 MW
961022 AF2-393 E Adder 0.4 MW 0.34 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
920272 AA2-123 E Adder 1.92 MW 1.63 MW
276170 Z1-108 E Adder 1.94 MW 1.65 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 57.57 MW 57.57 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.89 MW 10.89 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.14 MW 1.14 MW
NY PJM->LTFIMP_NY CLTF 0.62 MW 0.62 MW
WEC LTFEXP_WEC->PJM CLTF 2.69 MW 2.69 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.23 MW 0.23 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.11 MW 0.11 MW
TVA LTFEXP_TVA->PJM CLTF 1.15 MW 1.15 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.37 MW 0.37 MW
MEC LTFEXP_MEC->PJM CLTF 9.97 MW 9.97 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.06 MW 1.06 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.8 MW 2.8 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.34 MW 7.34 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.36 MW 0.36 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_116-45-L0303___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-L0303___SRT-A
CONTINGENCY 'COMED_P4_116-45-L0303___SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 REMOVE SWSHUNT FROM BUS 270827                    /*NEVADA   ; R 345.0
 TRIP BRANCH FROM BUS 936290 TO BUS 270827 CKT 1   /*AD2-038 TP   345.0 - NEVADA   ; R 345.0
END
Breaker AC 101.56 2297.0 STE 2332.79 16.48
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-L0303___SRT-A
CONTINGENCY 'COMED_P4_116-45-L0303___SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 REMOVE SWSHUNT FROM BUS 270827                    /*NEVADA   ; R 345.0
 TRIP BRANCH FROM BUS 936290 TO BUS 270827 CKT 1   /*AD2-038 TP   345.0 - NEVADA   ; R 345.0
END
Breaker AC 103.91 2297.0 STE 2386.81 16.54
Topology Case Flowgate Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_116-45-L0303___SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.68 MW 1.43 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C Adder 4.29 MW 3.65 MW
962782 AG1-127 E Adder 2.86 MW 2.43 MW
966441 AG1-513 C Adder 0.3 MW 0.26 MW
966442 AG1-513 E Adder 0.46 MW 0.39 MW
290021 O50 E Adder 24.69 MW 20.99 MW
290051 GSG-6; E Adder 6.69 MW 5.69 MW
295109 WESTBROOK E Adder 3.58 MW 3.04 MW
295111 SUBLETTE E Adder 1.74 MW 1.48 MW
933911 AD1-013 C Adder 1.17 MW 1.0 MW
933912 AD1-013 E Adder 1.88 MW 1.59 MW
933932 AD1-016 E Adder 1.01 MW 0.86 MW
934972 AD1-129 E Adder 0.4 MW 0.34 MW
937002 AD2-134 E Adder 6.47 MW 5.5 MW
937312 AD2-172 E Adder 2.33 MW 1.98 MW
937401 AD2-194 1 50/50 1.82 MW 1.82 MW
937411 AD2-194 2 50/50 1.83 MW 1.83 MW
942991 AE2-321 C Adder 5.45 MW 4.64 MW
942992 AE2-321 E Adder 2.69 MW 2.28 MW
943801 AF1-048 C Adder 2.55 MW 2.17 MW
943802 AF1-048 E Adder 1.7 MW 1.45 MW
958491 AF2-143 C Adder 13.1 MW 11.14 MW
958492 AF2-143 E Adder 8.74 MW 7.42 MW
958912 AF2-182 E Adder 24.16 MW 20.54 MW
959081 AF2-199 C Adder 4.94 MW 4.2 MW
959082 AF2-199 E Adder 2.47 MW 2.1 MW
959351 AF2-226 C 50/50 5.98 MW 5.98 MW
959352 AF2-226 E 50/50 8.97 MW 8.97 MW
960281 AF2-319 C 50/50 5.98 MW 5.98 MW
960282 AF2-319 E 50/50 8.97 MW 8.97 MW
960582 AF2-349 E Adder 24.38 MW 20.73 MW
960751 AF2-366 C Adder 4.28 MW 3.64 MW
960752 AF2-366 E Adder 2.85 MW 2.42 MW
274675 JOLIET 29;7U Adder 63.52 MW 53.99 MW
274676 JOLIET 29;8U Adder 62.8 MW 53.38 MW
274682 WAUKEGAN ;7U Adder 28.05 MW 23.84 MW
274683 WAUKEGAN ;8U Adder 30.19 MW 25.66 MW
274728 ELWOOD EC;5P 50/50 4.7 MW 4.7 MW
274729 ELWOOD EC;1P 50/50 4.67 MW 4.67 MW
274730 ELWOOD EC;6P 50/50 4.7 MW 4.7 MW
274732 ELWOOD EC;7P 50/50 4.7 MW 4.7 MW
274733 ELWOOD EC;3P 50/50 4.67 MW 4.67 MW
274734 ELWOOD EC;8P 50/50 4.7 MW 4.7 MW
274735 ELWOOD EC;4P 50/50 4.67 MW 4.67 MW
274736 ELWOOD EC;9P 50/50 4.7 MW 4.7 MW
274859 EASYR;U1 E Adder 8.44 MW 7.18 MW
274860 EASYR;U2 E Adder 8.44 MW 7.18 MW
274861 TOP CROP ;1U 50/50 0.83 MW 0.83 MW
274862 TOP CROP ;2U 50/50 1.59 MW 1.59 MW
276591 L-013 2 Adder 2.31 MW 1.96 MW
293644 O22 E1 50/50 34.34 MW 34.34 MW
293645 O22 E2 50/50 39.33 MW 39.33 MW
293715 O-029 E Adder 7.16 MW 6.09 MW
293716 O-029 E Adder 3.93 MW 3.34 MW
293717 O-029 E Adder 3.61 MW 3.07 MW
293771 O-035 E Adder 5.25 MW 4.46 MW
294401 BSHIL;1U E Adder 6.83 MW 5.8 MW
294410 BSHIL;2U E Adder 6.83 MW 5.8 MW
294763 P-046 E Adder 6.47 MW 5.5 MW
925582 AC1-033 E Adder 7.49 MW 6.36 MW
938511 AE1-070 1 50/50 14.54 MW 14.54 MW
938521 AE1-070 2 50/50 13.23 MW 13.23 MW
939061 AE1-134 2 Adder 0.98 MW 0.83 MW
940502 AE2-035 E Adder 2.33 MW 1.98 MW
946501 AF1-314 C Adder 2.99 MW 2.54 MW
946502 AF1-314 E Adder 14.04 MW 11.93 MW
946661 AF1-330 C Adder 1.34 MW 1.14 MW
946662 AF1-330 E Adder 0.29 MW 0.25 MW
957331 AF2-027 C Adder 1.69 MW 1.44 MW
957332 AF2-027 E Adder 2.54 MW 2.16 MW
957401 AF2-034 C Adder 1.83 MW 1.56 MW
957402 AF2-034 E Adder 1.56 MW 1.33 MW
957471 AF2-041 C Adder 14.83 MW 12.61 MW
957472 AF2-041 E Adder 7.41 MW 6.3 MW
938851 AE1-113 C Adder 10.19 MW 8.66 MW
938852 AE1-113 E Adder 36.12 MW 30.7 MW
934101 AD2-000 1 Adder 5.38 MW 4.57 MW
934111 AD2-000 2 Adder 7.51 MW 6.38 MW
276640 AC1-204 GEN1 50/50 17.38 MW 17.38 MW
276642 AC1-204 GEN2 50/50 17.48 MW 17.48 MW
276678 AD1-016 C Adder 0.62 MW 0.53 MW
276679 AD1-129 C Adder 0.61 MW 0.52 MW
293516 O-009 E Adder 13.85 MW 11.78 MW
916212 CRESCENT ;1U Adder 3.68 MW 3.13 MW
927208 AC1-214 E1 Adder 2.49 MW 2.11 MW
927209 AC1-214 E2 Adder 2.49 MW 2.11 MW
957751 AF2-069 C Adder 0.18 MW 0.15 MW
957752 AF2-069 E Adder 0.58 MW 0.5 MW
990901 L-005 E Adder 10.5 MW 8.93 MW
290108 LEEDK;1U E Adder 9.42 MW 8.01 MW
916221 Z1-073 E Adder 4.71 MW 4.01 MW
934051 AD1-031 C Adder 2.28 MW 1.94 MW
934052 AD1-031 E Adder 3.73 MW 3.17 MW
936291 AD2-038 C Adder 3.84 MW 3.27 MW
936292 AD2-038 E Adder 17.99 MW 15.29 MW
936511 AD2-066 C Adder 6.52 MW 5.54 MW
936512 AD2-066 E Adder 4.34 MW 3.69 MW
942421 AE2-255 C Adder 3.86 MW 3.28 MW
942422 AE2-255 E Adder 11.58 MW 9.84 MW
942651 AE2-281 C Adder 1.02 MW 0.87 MW
942652 AE2-281 E Adder 6.26 MW 5.32 MW
959091 AF2-200 C Adder 9.89 MW 8.4 MW
959092 AF2-200 E Adder 6.59 MW 5.6 MW
959101 AF2-201 C Adder 4.13 MW 3.51 MW
959102 AF2-201 E Adder 11.86 MW 10.08 MW
960721 AF2-363 C Adder 3.77 MW 3.21 MW
960722 AF2-363 E Adder 2.52 MW 2.14 MW
961011 AF2-392 C Adder 2.83 MW 2.4 MW
961012 AF2-392 E Adder 13.16 MW 11.19 MW
961021 AF2-393 C Adder 4.42 MW 3.75 MW
961031 AF2-394 C Adder 3.21 MW 2.73 MW
961651 AG1-005 C Adder 9.38 MW 7.97 MW
961652 AG1-005 E Adder 6.25 MW 5.31 MW
966822 AG1-553 E Adder 22.49 MW 19.11 MW
930481 AB1-089 C Adder 44.47 MW 37.8 MW
930482 AB1-089 E Adder 2.02 MW 1.72 MW
938861 AE1-114 C Adder 2.73 MW 2.32 MW
938862 AE1-114 E Adder 9.31 MW 7.91 MW
939321 AE1-163 C Adder 7.13 MW 6.06 MW
939322 AE1-163 E Adder 43.82 MW 37.25 MW
946152 AF1-280 E Adder 16.11 MW 13.69 MW
946321 AF1-296 C Adder 2.95 MW 2.51 MW
946322 AF1-296 E Adder 13.81 MW 11.74 MW
946671 AF1-331 C Adder 1.52 MW 1.3 MW
962691 AG1-118 C Adder 13.54 MW 11.51 MW
962692 AG1-118 E Adder 9.02 MW 7.67 MW
962711 AG1-120 C Adder 5.5 MW 4.67 MW
962712 AG1-120 E Adder 3.66 MW 3.12 MW
957761 AF2-070 C Adder 0.26 MW 0.22 MW
957762 AF2-070 E Adder 1.24 MW 1.05 MW
965661 AG1-434 C Adder 2.88 MW 2.45 MW
965662 AG1-434 E Adder 11.45 MW 9.73 MW
965671 AG1-435 C Adder 2.92 MW 2.48 MW
965672 AG1-435 E Adder 9.52 MW 8.09 MW
965931 AG1-462 C Adder 12.11 MW 10.3 MW
965932 AG1-462 E Adder 8.08 MW 6.87 MW
961022 AF2-393 E Adder 0.4 MW 0.34 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
920272 AA2-123 E Adder 1.92 MW 1.63 MW
276170 Z1-108 E Adder 1.94 MW 1.65 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 57.59 MW 57.59 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.9 MW 10.9 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.14 MW 1.14 MW
NY PJM->LTFIMP_NY CLTF 0.62 MW 0.62 MW
WEC LTFEXP_WEC->PJM CLTF 2.69 MW 2.69 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.23 MW 0.23 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.11 MW 0.11 MW
TVA LTFEXP_TVA->PJM CLTF 1.15 MW 1.15 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.37 MW 0.37 MW
MEC LTFEXP_MEC->PJM CLTF 9.98 MW 9.98 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.06 MW 1.06 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.81 MW 2.81 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.33 MW 7.33 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.36 MW 0.36 MW

Details for AURORA EC;RP-ELECT JCT;4R 345.0 kV Ckt 1 line l/o COMED_P4-6_111-345-B______SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE AURORA EC;RP-ELECT JCT;4R 345.0 kV Ckt 1 line
274749 to 270731 ckt 1
COMED_P4-6_111-345-B______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-B______SRT-A'
 DISCONNECT BUS 270730                                          /*ELECT JCT; B 345.0
 DISCONNECT BUS 275182                                          /*ELECT JCT;1M 138.0
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Breaker AC 104.35 1568.0 STE 1636.26 32.22
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE AURORA EC;RP-ELECT JCT;4R 345.0 kV Ckt 1 line
274749 to 270731 ckt 1
COMED_P4-6_111-345-B______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-B______SRT-A'
 DISCONNECT BUS 270730                                          /*ELECT JCT; B 345.0
 DISCONNECT BUS 275182                                          /*ELECT JCT;1M 138.0
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Breaker AC 107.81 1568.0 STE 1690.48 32.25
Topology Case Flowgate Details for AURORA EC;RP-ELECT JCT;4R 345.0 kV Ckt 1 line l/o COMED_P4-6_111-345-B______SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.49 MW 2.12 MW
962012 AG1-044 E Adder 0.08 MW 0.07 MW
962781 AG1-127 C Adder 5.92 MW 5.03 MW
962782 AG1-127 E Adder 3.94 MW 3.35 MW
290051 GSG-6; E Adder 10.01 MW 8.51 MW
295109 WESTBROOK E Adder 5.36 MW 4.55 MW
295111 SUBLETTE E Adder 2.6 MW 2.21 MW
933911 AD1-013 C Adder 1.74 MW 1.48 MW
933912 AD1-013 E Adder 2.78 MW 2.36 MW
933932 AD1-016 E Adder 3.11 MW 2.64 MW
934972 AD1-129 E Adder 1.18 MW 1.0 MW
937002 AD2-134 E Adder 9.68 MW 8.22 MW
937312 AD2-172 E Adder 5.85 MW 4.97 MW
942991 AE2-321 C Adder 16.71 MW 14.21 MW
942992 AE2-321 E Adder 8.23 MW 7.0 MW
943801 AF1-048 C Adder 7.81 MW 6.64 MW
943802 AF1-048 E Adder 5.21 MW 4.43 MW
958912 AF2-182 E Adder 54.61 MW 46.42 MW
959081 AF2-199 C Adder 9.67 MW 8.22 MW
959082 AF2-199 E Adder 4.83 MW 4.11 MW
960582 AF2-349 E Adder 73.65 MW 62.6 MW
960751 AF2-366 C Adder 5.9 MW 5.01 MW
960752 AF2-366 E Adder 3.93 MW 3.34 MW
274682 WAUKEGAN ;7U Adder 46.7 MW 39.69 MW
274683 WAUKEGAN ;8U Adder 50.04 MW 42.54 MW
274693 ROCKY RD ;1P 50/50 4.51 MW 4.51 MW
274695 ROCKY RD ;2P 50/50 4.56 MW 4.56 MW
274696 ROCKY RD ;4P 50/50 4.67 MW 4.67 MW
274697 ROCKY RD ;3P 50/50 1.24 MW 1.24 MW
274737 AURORA EC;1P 50/50 19.35 MW 19.35 MW
274739 AURORA EC;2P 50/50 19.35 MW 19.35 MW
274818 ELGIN EC ;1P 50/50 5.53 MW 5.53 MW
274819 ELGIN EC ;3P 50/50 5.47 MW 5.47 MW
274820 ELGIN EC ;2P 50/50 5.53 MW 5.53 MW
274821 ELGIN EC ;4P 50/50 5.52 MW 5.52 MW
274859 EASYR;U1 E Adder 20.03 MW 17.02 MW
274860 EASYR;U2 E Adder 20.03 MW 17.02 MW
276591 L-013 2 Adder 4.79 MW 4.07 MW
293715 O-029 E Adder 11.36 MW 9.66 MW
293716 O-029 E Adder 6.23 MW 5.29 MW
293717 O-029 E Adder 5.72 MW 4.87 MW
294763 P-046 E Adder 16.26 MW 13.82 MW
939061 AE1-134 2 Adder 1.97 MW 1.68 MW
940502 AE2-035 E Adder 5.85 MW 4.97 MW
946501 AF1-314 C Adder 7.51 MW 6.38 MW
946502 AF1-314 E Adder 35.27 MW 29.98 MW
946661 AF1-330 C Adder 4.12 MW 3.5 MW
946662 AF1-330 E Adder 0.9 MW 0.77 MW
957331 AF2-027 C Adder 2.91 MW 2.47 MW
957332 AF2-027 E Adder 4.36 MW 3.71 MW
957471 AF2-041 C Adder 29.0 MW 24.65 MW
957472 AF2-041 E Adder 14.5 MW 12.32 MW
276678 AD1-016 C Adder 1.91 MW 1.62 MW
276679 AD1-129 C Adder 1.77 MW 1.5 MW
293516 O-009 E Adder 21.97 MW 18.67 MW
290108 LEEDK;1U E Adder 19.65 MW 16.7 MW
916221 Z1-073 E Adder 7.05 MW 5.99 MW
959091 AF2-200 C Adder 19.33 MW 16.43 MW
959092 AF2-200 E Adder 12.89 MW 10.96 MW
959101 AF2-201 C Adder 10.37 MW 8.82 MW
959102 AF2-201 E Adder 29.78 MW 25.32 MW
960721 AF2-363 C Adder 7.37 MW 6.26 MW
960722 AF2-363 E Adder 4.91 MW 4.18 MW
961011 AF2-392 C Adder 5.47 MW 4.65 MW
961012 AF2-392 E Adder 25.44 MW 21.63 MW
961021 AF2-393 C Adder 8.54 MW 7.26 MW
961031 AF2-394 C Adder 6.21 MW 5.28 MW
966822 AG1-553 E Adder 37.04 MW 31.48 MW
930481 AB1-089 C 50/50 146.64 MW 146.64 MW
930482 AB1-089 E 50/50 6.67 MW 6.67 MW
938861 AE1-114 C Adder 6.21 MW 5.28 MW
938862 AE1-114 E Adder 21.2 MW 18.02 MW
946152 AF1-280 E Adder 36.4 MW 30.94 MW
946321 AF1-296 C Adder 4.96 MW 4.22 MW
946322 AF1-296 E Adder 23.23 MW 19.75 MW
946671 AF1-331 C Adder 2.26 MW 1.92 MW
962691 AG1-118 C Adder 16.98 MW 14.44 MW
962692 AG1-118 E Adder 11.32 MW 9.62 MW
962711 AG1-120 C Adder 10.74 MW 9.13 MW
962712 AG1-120 E Adder 7.16 MW 6.08 MW
965661 AG1-434 C Adder 5.68 MW 4.82 MW
965662 AG1-434 E Adder 22.54 MW 19.16 MW
965931 AG1-462 C Adder 19.95 MW 16.96 MW
965932 AG1-462 E Adder 13.3 MW 11.31 MW
961022 AF2-393 E Adder 0.78 MW 0.66 MW
276626 AG1-044 E Adder 0.1 MW 0.08 MW
920272 AA2-123 E Adder 5.91 MW 5.02 MW
276170 Z1-108 E Adder 6.24 MW 5.3 MW
945352 AF1-200 NFTW Adder 220.86 MW 187.73 MW
955972 J1084 External Queue 12.16 MW 12.16 MW
990117 J1214 G External Queue 39.56 MW 39.56 MW
990407 J1304 G External Queue 9.29 MW 9.29 MW
990512 J1326 G External Queue 9.9 MW 9.9 MW
990727 J1377 G External Queue 14.69 MW 14.69 MW
990947 J1432 C External Queue 3.13 MW 3.13 MW
990948 J1432 E External Queue 16.96 MW 16.96 MW
991392 J1884 External Queue 22.85 MW 22.85 MW
991417 J1934 External Queue 14.47 MW 14.47 MW
991687 J2304 G External Queue 49.21 MW 49.21 MW
991777 J1629 G External Queue 21.35 MW 21.35 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 115.16 MW 115.16 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 8.18 MW 8.18 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.92 MW 0.92 MW
NY PJM->LTFIMP_NY CLTF 0.5 MW 0.5 MW
WEC LTFEXP_WEC->PJM CLTF 4.88 MW 4.88 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.18 MW 0.18 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.08 MW 0.08 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.39 MW 0.39 MW
MEC LTFEXP_MEC->PJM CLTF 14.02 MW 14.02 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.16 MW 1.16 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.96 MW 2.96 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 5.92 MW 5.92 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.29 MW 0.29 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P2-2_111_EJ-345R__3_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P2-2_111_EJ-345R__3_SRT-A
CONTINGENCY 'COMED_P2-2_111_EJ-345R__3_SRT-A'
 DISCONNECT BUS 270733   /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183   /*ELECT JCT;3M 138.0
END
Bus AC 118.52 1568.0 STE 1858.36 30.13
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P2-2_111_EJ-345R__3_SRT-A
CONTINGENCY 'COMED_P2-2_111_EJ-345R__3_SRT-A'
 DISCONNECT BUS 270733   /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183   /*ELECT JCT;3M 138.0
END
Bus AC 116.4 1568.0 STE 1825.19 30.1
Topology Case Flowgate Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P2-2_111_EJ-345R__3_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.16 MW 1.83 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C 50/50 6.01 MW 6.01 MW
962782 AG1-127 E 50/50 4.0 MW 4.0 MW
966441 AG1-513 C 50/50 0.41 MW 0.41 MW
966442 AG1-513 E 50/50 0.61 MW 0.61 MW
290051 GSG-6; E Adder 8.55 MW 7.27 MW
295109 WESTBROOK E Adder 4.58 MW 3.89 MW
295111 SUBLETTE E Adder 2.23 MW 1.89 MW
933911 AD1-013 C Adder 1.51 MW 1.29 MW
933912 AD1-013 E Adder 2.42 MW 2.06 MW
934972 AD1-129 E Adder 0.25 MW 0.21 MW
937002 AD2-134 E Adder 8.27 MW 7.03 MW
937312 AD2-172 E Adder 1.69 MW 1.44 MW
958912 AF2-182 E Adder 22.97 MW 19.53 MW
959081 AF2-199 C 50/50 9.04 MW 9.04 MW
959082 AF2-199 E 50/50 4.52 MW 4.52 MW
960751 AF2-366 C 50/50 6.0 MW 6.0 MW
960752 AF2-366 E 50/50 4.0 MW 4.0 MW
274738 AURORA EC;3P 50/50 4.29 MW 4.29 MW
274740 AURORA EC;4P 50/50 4.29 MW 4.29 MW
274741 AURORA EC;5P 50/50 0.79 MW 0.79 MW
274742 AURORA EC;6P 50/50 0.79 MW 0.79 MW
274743 AURORA EC;7P 50/50 0.79 MW 0.79 MW
274744 AURORA EC;8P 50/50 0.79 MW 0.79 MW
274745 AURORA EC;9P 50/50 0.79 MW 0.79 MW
274746 AURORA EC;0P 50/50 0.79 MW 0.79 MW
274859 EASYR;U1 E Adder 7.76 MW 6.59 MW
274860 EASYR;U2 E Adder 7.76 MW 6.59 MW
276591 L-013 2 50/50 3.3 MW 3.3 MW
293715 O-029 E Adder 5.76 MW 4.9 MW
293716 O-029 E Adder 3.16 MW 2.69 MW
293717 O-029 E Adder 2.9 MW 2.47 MW
294763 P-046 E Adder 4.7 MW 3.99 MW
939061 AE1-134 2 Adder 1.0 MW 0.85 MW
940502 AE2-035 E Adder 1.69 MW 1.44 MW
946501 AF1-314 C Adder 2.17 MW 1.84 MW
946502 AF1-314 E Adder 10.19 MW 8.66 MW
957471 AF2-041 C 50/50 27.11 MW 27.11 MW
957472 AF2-041 E 50/50 13.56 MW 13.56 MW
276679 AD1-129 C Adder 0.38 MW 0.32 MW
293516 O-009 E Adder 11.14 MW 9.47 MW
274872 LEE DEKAL;1U 50/50 0.64 MW 0.64 MW
290108 LEEDK;1U E 50/50 20.77 MW 20.77 MW
916221 Z1-073 E Adder 6.03 MW 5.12 MW
943121 AE2-341 C 50/50 11.21 MW 11.21 MW
943122 AE2-341 E 50/50 5.5 MW 5.5 MW
943591 AF1-030 C 50/50 7.45 MW 7.45 MW
943592 AF1-030 E 50/50 3.69 MW 3.69 MW
959091 AF2-200 C 50/50 18.08 MW 18.08 MW
959092 AF2-200 E 50/50 12.05 MW 12.05 MW
959101 AF2-201 C Adder 3.0 MW 2.55 MW
959102 AF2-201 E Adder 8.6 MW 7.31 MW
960381 AF2-329 C 50/50 4.7 MW 4.7 MW
960721 AF2-363 C Adder 4.18 MW 3.55 MW
960722 AF2-363 E Adder 2.79 MW 2.37 MW
961011 AF2-392 C Adder 2.72 MW 2.32 MW
961012 AF2-392 E Adder 12.68 MW 10.78 MW
961021 AF2-393 C Adder 4.26 MW 3.62 MW
961031 AF2-394 C Adder 3.1 MW 2.63 MW
966822 AG1-553 E Adder 16.59 MW 14.1 MW
930481 AB1-089 C Adder 36.72 MW 31.21 MW
930482 AB1-089 E Adder 1.67 MW 1.42 MW
938861 AE1-114 C Adder 2.24 MW 1.91 MW
938862 AE1-114 E Adder 7.64 MW 6.5 MW
946152 AF1-280 E Adder 15.32 MW 13.02 MW
946321 AF1-296 C Adder 2.2 MW 1.87 MW
946322 AF1-296 E Adder 10.32 MW 8.77 MW
946671 AF1-331 C Adder 1.96 MW 1.67 MW
962691 AG1-118 C 50/50 20.34 MW 20.34 MW
962692 AG1-118 E 50/50 13.56 MW 13.56 MW
962711 AG1-120 C Adder 6.09 MW 5.18 MW
962712 AG1-120 E Adder 4.06 MW 3.45 MW
965661 AG1-434 C 50/50 4.7 MW 4.7 MW
965662 AG1-434 E 50/50 18.68 MW 18.68 MW
965931 AG1-462 C Adder 8.94 MW 7.6 MW
965932 AG1-462 E Adder 5.96 MW 5.06 MW
961022 AF2-393 E Adder 0.39 MW 0.33 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
945351 AF1-200 FTIR Adder 234.99 MW 199.74 MW
955972 J1084 External Queue 8.02 MW 8.02 MW
991417 J1934 External Queue -8.86 MW -8.86 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 5.18 MW 5.18 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.42 MW 2.42 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.33 MW 0.33 MW
NY PJM->LTFIMP_NY CLTF 0.18 MW 0.18 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.08 MW 0.08 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.04 MW 0.04 MW
TVA LTFEXP_TVA->PJM CLTF 0.27 MW 0.27 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.13 MW 0.13 MW
MEC LTFEXP_MEC->PJM CLTF 3.88 MW 3.88 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.4 MW 0.4 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.78 MW 0.78 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.13 MW 2.13 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.12 MW 0.12 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P2-2_116_GG-345R__2_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P2-2_116_GG-345R__2_SRT-A
CONTINGENCY 'COMED_P2-2_116_GG-345R__2_SRT-A'
 DISCONNECT BUS 270769   /*GOODINGS ;2R 345.0
END
Bus AC 102.37 2297.0 STE 2351.35 16.47
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P2-2_116_GG-345R__2_SRT-A
CONTINGENCY 'COMED_P2-2_116_GG-345R__2_SRT-A'
 DISCONNECT BUS 270769   /*GOODINGS ;2R 345.0
END
Bus AC 104.72 2297.0 STE 2405.39 16.54
Topology Case Flowgate Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P2-2_116_GG-345R__2_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.68 MW 1.43 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C Adder 2.64 MW 2.24 MW
966441 AG1-513 C Adder 0.3 MW 0.26 MW
966442 AG1-513 E Adder 0.46 MW 0.39 MW
290021 O50 E Adder 24.69 MW 20.99 MW
290051 GSG-6; E Adder 6.69 MW 5.68 MW
295109 WESTBROOK E Adder 3.58 MW 3.04 MW
295111 SUBLETTE E Adder 1.74 MW 1.48 MW
918052 AA1-018 E OP Adder 18.8 MW 15.98 MW
933911 AD1-013 C Adder 1.17 MW 1.0 MW
933912 AD1-013 E Adder 1.88 MW 1.59 MW
933932 AD1-016 E Adder 1.01 MW 0.86 MW
934972 AD1-129 E Adder 0.4 MW 0.34 MW
937002 AD2-134 E Adder 6.47 MW 5.5 MW
937312 AD2-172 E Adder 2.33 MW 1.98 MW
937401 AD2-194 1 50/50 1.82 MW 1.82 MW
937411 AD2-194 2 50/50 1.83 MW 1.83 MW
942991 AE2-321 C Adder 5.45 MW 4.63 MW
942992 AE2-321 E Adder 2.69 MW 2.28 MW
943801 AF1-048 C Adder 2.55 MW 2.17 MW
943802 AF1-048 E Adder 1.7 MW 1.44 MW
958481 AF2-142 C Adder 12.97 MW 11.02 MW
958482 AF2-142 E Adder 8.65 MW 7.35 MW
958491 AF2-143 C Adder 13.1 MW 11.14 MW
958492 AF2-143 E Adder 8.73 MW 7.42 MW
958912 AF2-182 E Adder 24.16 MW 20.53 MW
959081 AF2-199 C Adder 4.94 MW 4.2 MW
959082 AF2-199 E Adder 2.47 MW 2.1 MW
959351 AF2-226 C 50/50 5.98 MW 5.98 MW
959352 AF2-226 E 50/50 8.97 MW 8.97 MW
960281 AF2-319 C 50/50 5.98 MW 5.98 MW
960282 AF2-319 E 50/50 8.97 MW 8.97 MW
960582 AF2-349 E Adder 24.38 MW 20.72 MW
274675 JOLIET 29;7U Adder 63.51 MW 53.98 MW
274676 JOLIET 29;8U Adder 62.79 MW 53.37 MW
274682 WAUKEGAN ;7U Adder 28.05 MW 23.84 MW
274683 WAUKEGAN ;8U Adder 30.19 MW 25.66 MW
274728 ELWOOD EC;5P 50/50 4.7 MW 4.7 MW
274729 ELWOOD EC;1P 50/50 4.67 MW 4.67 MW
274730 ELWOOD EC;6P 50/50 4.7 MW 4.7 MW
274731 ELWOOD EC;2P 50/50 4.67 MW 4.67 MW
274732 ELWOOD EC;7P 50/50 4.7 MW 4.7 MW
274733 ELWOOD EC;3P 50/50 4.67 MW 4.67 MW
274734 ELWOOD EC;8P 50/50 4.7 MW 4.7 MW
274736 ELWOOD EC;9P 50/50 4.7 MW 4.7 MW
274859 EASYR;U1 E Adder 8.44 MW 7.17 MW
274860 EASYR;U2 E Adder 8.44 MW 7.17 MW
274861 TOP CROP ;1U 50/50 0.83 MW 0.83 MW
274862 TOP CROP ;2U 50/50 1.59 MW 1.59 MW
276591 L-013 2 Adder 2.31 MW 1.96 MW
293644 O22 E1 50/50 34.34 MW 34.34 MW
293645 O22 E2 50/50 39.33 MW 39.33 MW
293715 O-029 E Adder 7.16 MW 6.09 MW
293716 O-029 E Adder 3.93 MW 3.34 MW
293717 O-029 E Adder 3.61 MW 3.07 MW
293771 O-035 E Adder 5.24 MW 4.46 MW
294401 BSHIL;1U E Adder 6.83 MW 5.8 MW
294410 BSHIL;2U E Adder 6.83 MW 5.8 MW
294763 P-046 E Adder 6.47 MW 5.5 MW
925582 AC1-033 E Adder 7.49 MW 6.36 MW
938511 AE1-070 1 50/50 14.54 MW 14.54 MW
938521 AE1-070 2 50/50 13.23 MW 13.23 MW
939061 AE1-134 2 Adder 0.98 MW 0.83 MW
940502 AE2-035 E Adder 2.33 MW 1.98 MW
946501 AF1-314 C Adder 2.99 MW 2.54 MW
946502 AF1-314 E Adder 14.04 MW 11.93 MW
946661 AF1-330 C Adder 1.34 MW 1.14 MW
946662 AF1-330 E Adder 0.29 MW 0.25 MW
957331 AF2-027 C Adder 1.69 MW 1.44 MW
957332 AF2-027 E Adder 2.54 MW 2.15 MW
957401 AF2-034 C Adder 1.83 MW 1.56 MW
957402 AF2-034 E Adder 1.56 MW 1.32 MW
957471 AF2-041 C Adder 14.83 MW 12.6 MW
957472 AF2-041 E Adder 7.41 MW 6.3 MW
938851 AE1-113 C Adder 10.19 MW 8.66 MW
938852 AE1-113 E Adder 36.11 MW 30.7 MW
934101 AD2-000 1 Adder 5.38 MW 4.57 MW
934111 AD2-000 2 Adder 7.51 MW 6.38 MW
276640 AC1-204 GEN1 50/50 17.38 MW 17.38 MW
276642 AC1-204 GEN2 50/50 17.48 MW 17.48 MW
276678 AD1-016 C Adder 0.62 MW 0.53 MW
276679 AD1-129 C Adder 0.61 MW 0.52 MW
293516 O-009 E Adder 13.85 MW 11.77 MW
916212 CRESCENT ;1U Adder 3.68 MW 3.13 MW
927208 AC1-214 E1 Adder 2.49 MW 2.11 MW
927209 AC1-214 E2 Adder 2.49 MW 2.11 MW
957751 AF2-069 C Adder 0.18 MW 0.15 MW
957752 AF2-069 E Adder 0.58 MW 0.5 MW
990901 L-005 E Adder 10.5 MW 8.93 MW
916221 Z1-073 E Adder 4.71 MW 4.01 MW
934051 AD1-031 C Adder 2.28 MW 1.94 MW
934052 AD1-031 E Adder 3.73 MW 3.17 MW
936291 AD2-038 C Adder 3.84 MW 3.27 MW
936292 AD2-038 E Adder 17.99 MW 15.29 MW
936511 AD2-066 C Adder 6.52 MW 5.54 MW
936512 AD2-066 E Adder 4.34 MW 3.69 MW
942421 AE2-255 C Adder 3.86 MW 3.28 MW
942422 AE2-255 E Adder 11.57 MW 9.84 MW
942651 AE2-281 C Adder 1.02 MW 0.87 MW
942652 AE2-281 E Adder 6.26 MW 5.32 MW
959091 AF2-200 C Adder 9.88 MW 8.4 MW
959092 AF2-200 E Adder 6.59 MW 5.6 MW
959101 AF2-201 C Adder 4.13 MW 3.51 MW
959102 AF2-201 E Adder 11.85 MW 10.07 MW
960721 AF2-363 C Adder 3.77 MW 3.21 MW
960722 AF2-363 E Adder 2.52 MW 2.14 MW
961011 AF2-392 C Adder 2.83 MW 2.4 MW
961012 AF2-392 E Adder 13.16 MW 11.18 MW
961021 AF2-393 C Adder 4.42 MW 3.75 MW
961031 AF2-394 C Adder 3.21 MW 2.73 MW
961651 AG1-005 C Adder 9.37 MW 7.97 MW
961652 AG1-005 E Adder 6.25 MW 5.31 MW
966822 AG1-553 E Adder 22.48 MW 19.11 MW
930481 AB1-089 C Adder 44.46 MW 37.79 MW
930482 AB1-089 E Adder 2.02 MW 1.72 MW
938861 AE1-114 C Adder 2.73 MW 2.32 MW
938862 AE1-114 E Adder 9.31 MW 7.91 MW
939321 AE1-163 C Adder 7.13 MW 6.06 MW
939322 AE1-163 E Adder 43.82 MW 37.24 MW
946152 AF1-280 E Adder 16.1 MW 13.69 MW
946321 AF1-296 C Adder 2.95 MW 2.51 MW
946322 AF1-296 E Adder 13.81 MW 11.74 MW
946671 AF1-331 C Adder 1.52 MW 1.3 MW
962691 AG1-118 C Adder 13.53 MW 11.5 MW
962692 AG1-118 E Adder 9.02 MW 7.67 MW
962711 AG1-120 C Adder 5.5 MW 4.67 MW
962712 AG1-120 E Adder 3.66 MW 3.12 MW
957761 AF2-070 C Adder 0.26 MW 0.22 MW
957762 AF2-070 E Adder 1.24 MW 1.05 MW
965661 AG1-434 C Adder 2.88 MW 2.45 MW
965662 AG1-434 E Adder 11.45 MW 9.73 MW
965671 AG1-435 C Adder 2.92 MW 2.48 MW
965672 AG1-435 E Adder 9.52 MW 8.09 MW
965931 AG1-462 C Adder 12.11 MW 10.29 MW
965932 AG1-462 E Adder 8.07 MW 6.86 MW
961022 AF2-393 E Adder 0.4 MW 0.34 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
920272 AA2-123 E Adder 1.92 MW 1.63 MW
276170 Z1-108 E Adder 1.94 MW 1.65 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 57.57 MW 57.57 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.89 MW 10.89 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.14 MW 1.14 MW
NY PJM->LTFIMP_NY CLTF 0.62 MW 0.62 MW
WEC LTFEXP_WEC->PJM CLTF 2.69 MW 2.69 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.23 MW 0.23 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.11 MW 0.11 MW
TVA LTFEXP_TVA->PJM CLTF 1.15 MW 1.15 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.37 MW 0.37 MW
MEC LTFEXP_MEC->PJM CLTF 9.97 MW 9.97 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.06 MW 1.06 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.8 MW 2.8 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.34 MW 7.34 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.36 MW 0.36 MW

Details for GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Single AC 114.93 1568.0 STE 1802.13 7.04
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Single AC 113.18 1568.0 STE 1774.67 7.04
Topology Case Flowgate Details for GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C 80/20 4.91 MW 4.91 MW
933911 AD1-013 C 80/20 1.43 MW 1.43 MW
937001 AD2-134 C 80/20 0.3 MW 0.3 MW
942991 AE2-321 C 80/20 3.92 MW 3.92 MW
943801 AF1-048 C 80/20 1.83 MW 1.83 MW
959081 AF2-199 C 80/20 3.52 MW 3.52 MW
960751 AF2-366 C 80/20 4.89 MW 4.89 MW
274656 BYRON ;1U 80/20 44.92 MW 44.92 MW
274657 BYRON ;2U 80/20 43.93 MW 43.93 MW
274662 QUAD CITI;1U 80/20 13.83 MW 13.83 MW
274663 QUAD CITI;2U 80/20 13.88 MW 13.88 MW
274699 CORDOVA ;1C 80/20 2.43 MW 2.43 MW
274700 CORDOVA ;2C 80/20 2.43 MW 2.43 MW
274701 CORDOVA ;1S 80/20 2.74 MW 2.74 MW
274715 NELSON EC;1C 80/20 3.23 MW 3.23 MW
274716 NELSON EC;1S 80/20 2.35 MW 2.35 MW
274717 NELSON EC;2C 80/20 3.25 MW 3.25 MW
274718 NELSON EC;2S 80/20 2.37 MW 2.37 MW
274822 ROCKFORD ;11 80/20 6.55 MW 6.55 MW
274823 ROCKFORD ;21 80/20 6.59 MW 6.59 MW
274824 ROCKFORD ;12 80/20 6.5 MW 6.5 MW
274855 GSG-6 ;RU 80/20 0.31 MW 0.31 MW
274856 ECOGROVE ;U1 80/20 0.61 MW 0.61 MW
274857 BIG SKY ;U1 80/20 0.41 MW 0.41 MW
274858 BIG SKY ;U2 80/20 0.41 MW 0.41 MW
276156 O-029 C 80/20 0.18 MW 0.18 MW
276157 O-029 C 80/20 0.32 MW 0.32 MW
276158 O-029 C 80/20 0.32 MW 0.32 MW
276590 R-018 80/20 0.24 MW 0.24 MW
939051 AE1-134 1 80/20 0.23 MW 0.23 MW
939061 AE1-134 2 80/20 1.54 MW 1.54 MW
946501 AF1-314 C 80/20 7.74 MW 7.74 MW
946661 AF1-330 C 80/20 0.88 MW 0.88 MW
957471 AF2-041 C 80/20 10.57 MW 10.57 MW
274760 LEE CO EC;1U 80/20 2.28 MW 2.28 MW
274881 WALNUT RG;1U 80/20 0.68 MW 0.68 MW
276602 WESTBROOK C 80/20 0.1 MW 0.1 MW
276603 SUBLETTE C 80/20 0.05 MW 0.05 MW
276611 AD2-172 C 80/20 0.66 MW 0.66 MW
276612 AE2-035 C 80/20 0.66 MW 0.66 MW
276676 AA2-030 GEN 80/20 3.01 MW 3.01 MW
276677 AA1-146 80/20 3.64 MW 3.64 MW
276678 AD1-016 C 80/20 0.47 MW 0.47 MW
276679 AD1-129 C 80/20 1.27 MW 1.27 MW
274872 LEE DEKAL;1U 80/20 0.48 MW 0.48 MW
274850 MENDOTA H;RU 80/20 0.2 MW 0.2 MW
274761 LEE CO EC;2U 80/20 2.28 MW 2.28 MW
274762 LEE CO EC;3U 80/20 2.28 MW 2.28 MW
274763 LEE CO EC;4U 80/20 2.25 MW 2.25 MW
274764 LEE CO EC;5U 80/20 2.28 MW 2.28 MW
274765 LEE CO EC;6U 80/20 2.28 MW 2.28 MW
274766 LEE CO EC;7U 80/20 2.25 MW 2.25 MW
274767 LEE CO EC;8U 80/20 2.25 MW 2.25 MW
959091 AF2-200 C 80/20 7.04 MW 7.04 MW
959101 AF2-201 C 80/20 10.69 MW 10.69 MW
960721 AF2-363 C 80/20 7.5 MW 7.5 MW
961011 AF2-392 C 80/20 4.48 MW 4.48 MW
961021 AF2-393 C 80/20 7.0 MW 7.0 MW
961031 AF2-394 C 80/20 5.09 MW 5.09 MW
930481 AB1-089 C 80/20 139.2 MW 139.2 MW
938861 AE1-114 C 80/20 6.01 MW 6.01 MW
946321 AF1-296 C 80/20 3.87 MW 3.87 MW
946671 AF1-331 C 80/20 1.85 MW 1.85 MW
962691 AG1-118 C 80/20 12.3 MW 12.3 MW
962711 AG1-120 C 80/20 10.92 MW 10.92 MW
965661 AG1-434 C 80/20 2.66 MW 2.66 MW
965931 AG1-462 C 80/20 15.35 MW 15.35 MW
955972 J1084 External Queue 10.99 MW 10.99 MW
956412 J1131 External Queue 5.82 MW 5.82 MW
956832 J1181 C External Queue 1.66 MW 1.66 MW
990117 J1214 G External Queue 38.33 MW 38.33 MW
990407 J1304 G External Queue 9.34 MW 9.34 MW
990512 J1326 G External Queue 9.6 MW 9.6 MW
990727 J1377 G External Queue 16.4 MW 16.4 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
991092 J1477 External Queue 2.91 MW 2.91 MW
991392 J1884 External Queue 17.87 MW 17.87 MW
991667 J2272 External Queue 15.58 MW 15.58 MW
991687 J2304 G External Queue 43.39 MW 43.39 MW
991777 J1629 G External Queue 10.92 MW 10.92 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.74 MW 59.74 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.71 MW 6.71 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.05 MW 0.05 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.81 MW 9.81 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.28 MW 2.28 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

Details for CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Single AC 114.93 1568.0 STE 1802.13 7.04
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Single AC 113.18 1568.0 STE 1774.67 7.04
Topology Case Flowgate Details for CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C 80/20 4.91 MW 4.91 MW
933911 AD1-013 C 80/20 1.43 MW 1.43 MW
937001 AD2-134 C 80/20 0.3 MW 0.3 MW
942991 AE2-321 C 80/20 3.92 MW 3.92 MW
943801 AF1-048 C 80/20 1.83 MW 1.83 MW
959081 AF2-199 C 80/20 3.52 MW 3.52 MW
960751 AF2-366 C 80/20 4.89 MW 4.89 MW
274656 BYRON ;1U 80/20 44.92 MW 44.92 MW
274657 BYRON ;2U 80/20 43.93 MW 43.93 MW
274662 QUAD CITI;1U 80/20 13.83 MW 13.83 MW
274663 QUAD CITI;2U 80/20 13.88 MW 13.88 MW
274699 CORDOVA ;1C 80/20 2.43 MW 2.43 MW
274700 CORDOVA ;2C 80/20 2.43 MW 2.43 MW
274701 CORDOVA ;1S 80/20 2.74 MW 2.74 MW
274715 NELSON EC;1C 80/20 3.23 MW 3.23 MW
274716 NELSON EC;1S 80/20 2.35 MW 2.35 MW
274717 NELSON EC;2C 80/20 3.25 MW 3.25 MW
274718 NELSON EC;2S 80/20 2.37 MW 2.37 MW
274822 ROCKFORD ;11 80/20 6.55 MW 6.55 MW
274823 ROCKFORD ;21 80/20 6.59 MW 6.59 MW
274824 ROCKFORD ;12 80/20 6.5 MW 6.5 MW
274855 GSG-6 ;RU 80/20 0.31 MW 0.31 MW
274856 ECOGROVE ;U1 80/20 0.61 MW 0.61 MW
274857 BIG SKY ;U1 80/20 0.41 MW 0.41 MW
274858 BIG SKY ;U2 80/20 0.41 MW 0.41 MW
276156 O-029 C 80/20 0.18 MW 0.18 MW
276157 O-029 C 80/20 0.32 MW 0.32 MW
276158 O-029 C 80/20 0.32 MW 0.32 MW
276590 R-018 80/20 0.24 MW 0.24 MW
939051 AE1-134 1 80/20 0.23 MW 0.23 MW
939061 AE1-134 2 80/20 1.54 MW 1.54 MW
946501 AF1-314 C 80/20 7.74 MW 7.74 MW
946661 AF1-330 C 80/20 0.88 MW 0.88 MW
957471 AF2-041 C 80/20 10.57 MW 10.57 MW
274760 LEE CO EC;1U 80/20 2.28 MW 2.28 MW
274881 WALNUT RG;1U 80/20 0.68 MW 0.68 MW
276602 WESTBROOK C 80/20 0.1 MW 0.1 MW
276603 SUBLETTE C 80/20 0.05 MW 0.05 MW
276611 AD2-172 C 80/20 0.66 MW 0.66 MW
276612 AE2-035 C 80/20 0.66 MW 0.66 MW
276676 AA2-030 GEN 80/20 3.01 MW 3.01 MW
276677 AA1-146 80/20 3.64 MW 3.64 MW
276678 AD1-016 C 80/20 0.47 MW 0.47 MW
276679 AD1-129 C 80/20 1.27 MW 1.27 MW
274872 LEE DEKAL;1U 80/20 0.48 MW 0.48 MW
274850 MENDOTA H;RU 80/20 0.2 MW 0.2 MW
274761 LEE CO EC;2U 80/20 2.28 MW 2.28 MW
274762 LEE CO EC;3U 80/20 2.28 MW 2.28 MW
274763 LEE CO EC;4U 80/20 2.25 MW 2.25 MW
274764 LEE CO EC;5U 80/20 2.28 MW 2.28 MW
274765 LEE CO EC;6U 80/20 2.28 MW 2.28 MW
274766 LEE CO EC;7U 80/20 2.25 MW 2.25 MW
274767 LEE CO EC;8U 80/20 2.25 MW 2.25 MW
959091 AF2-200 C 80/20 7.04 MW 7.04 MW
959101 AF2-201 C 80/20 10.69 MW 10.69 MW
960721 AF2-363 C 80/20 7.5 MW 7.5 MW
961011 AF2-392 C 80/20 4.48 MW 4.48 MW
961021 AF2-393 C 80/20 7.0 MW 7.0 MW
961031 AF2-394 C 80/20 5.09 MW 5.09 MW
930481 AB1-089 C 80/20 139.2 MW 139.2 MW
938861 AE1-114 C 80/20 6.01 MW 6.01 MW
946321 AF1-296 C 80/20 3.87 MW 3.87 MW
946671 AF1-331 C 80/20 1.85 MW 1.85 MW
962691 AG1-118 C 80/20 12.3 MW 12.3 MW
962711 AG1-120 C 80/20 10.92 MW 10.92 MW
965661 AG1-434 C 80/20 2.66 MW 2.66 MW
965931 AG1-462 C 80/20 15.35 MW 15.35 MW
955972 J1084 External Queue 10.99 MW 10.99 MW
956412 J1131 External Queue 5.82 MW 5.82 MW
956832 J1181 C External Queue 1.66 MW 1.66 MW
990117 J1214 G External Queue 38.33 MW 38.33 MW
990407 J1304 G External Queue 9.34 MW 9.34 MW
990512 J1326 G External Queue 9.6 MW 9.6 MW
990727 J1377 G External Queue 16.4 MW 16.4 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
991092 J1477 External Queue 2.91 MW 2.91 MW
991392 J1884 External Queue 17.87 MW 17.87 MW
991667 J2272 External Queue 15.58 MW 15.58 MW
991687 J2304 G External Queue 43.39 MW 43.39 MW
991777 J1629 G External Queue 10.92 MW 10.92 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.74 MW 59.74 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.71 MW 6.71 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.05 MW 0.05 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.81 MW 9.81 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.28 MW 2.28 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Base Case Single AC 113.52 1201.0 A 1363.35 17.57
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Base Case Single AC 111.36 1201.0 A 1337.45 17.56
Topology Case Flowgate Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C 80/20 5.5 MW 5.5 MW
966441 AG1-513 C 80/20 0.27 MW 0.27 MW
933911 AD1-013 C 80/20 1.4 MW 1.4 MW
937001 AD2-134 C 80/20 0.29 MW 0.29 MW
959081 AF2-199 C 80/20 8.79 MW 8.79 MW
960751 AF2-366 C 80/20 5.49 MW 5.49 MW
274715 NELSON EC;1C 80/20 2.03 MW 2.03 MW
274716 NELSON EC;1S 80/20 1.48 MW 1.48 MW
274717 NELSON EC;2C 80/20 2.05 MW 2.05 MW
274718 NELSON EC;2S 80/20 1.5 MW 1.5 MW
274738 AURORA EC;3P 80/20 4.03 MW 4.03 MW
274740 AURORA EC;4P 80/20 4.03 MW 4.03 MW
274741 AURORA EC;5P 80/20 0.53 MW 0.53 MW
274742 AURORA EC;6P 80/20 0.53 MW 0.53 MW
274743 AURORA EC;7P 80/20 0.53 MW 0.53 MW
274744 AURORA EC;8P 80/20 0.53 MW 0.53 MW
274745 AURORA EC;9P 80/20 0.53 MW 0.53 MW
274746 AURORA EC;0P 80/20 0.53 MW 0.53 MW
274818 ELGIN EC ;1P 80/20 1.44 MW 1.44 MW
274819 ELGIN EC ;3P 80/20 1.25 MW 1.25 MW
274820 ELGIN EC ;2P 80/20 1.44 MW 1.44 MW
274821 ELGIN EC ;4P 80/20 1.26 MW 1.26 MW
274855 GSG-6 ;RU 80/20 0.3 MW 0.3 MW
274857 BIG SKY ;U1 80/20 0.16 MW 0.16 MW
274858 BIG SKY ;U2 80/20 0.16 MW 0.16 MW
276156 O-029 C 80/20 0.11 MW 0.11 MW
276157 O-029 C 80/20 0.19 MW 0.19 MW
276158 O-029 C 80/20 0.19 MW 0.19 MW
939051 AE1-134 1 80/20 0.14 MW 0.14 MW
939061 AE1-134 2 80/20 0.97 MW 0.97 MW
946501 AF1-314 C Adder 2.06 MW 1.75 MW
957471 AF2-041 C 80/20 26.36 MW 26.36 MW
274760 LEE CO EC;1U 80/20 0.91 MW 0.91 MW
274881 WALNUT RG;1U 80/20 0.41 MW 0.41 MW
276602 WESTBROOK C 80/20 0.1 MW 0.1 MW
276603 SUBLETTE C 80/20 0.04 MW 0.04 MW
276676 AA2-030 GEN 80/20 1.89 MW 1.89 MW
276677 AA1-146 80/20 2.29 MW 2.29 MW
274872 LEE DEKAL;1U 80/20 0.58 MW 0.58 MW
274850 MENDOTA H;RU 80/20 0.2 MW 0.2 MW
274761 LEE CO EC;2U 80/20 0.91 MW 0.91 MW
274762 LEE CO EC;3U 80/20 0.91 MW 0.91 MW
274763 LEE CO EC;4U 80/20 0.9 MW 0.9 MW
274764 LEE CO EC;5U 80/20 0.91 MW 0.91 MW
274765 LEE CO EC;6U 80/20 0.91 MW 0.91 MW
274766 LEE CO EC;7U 80/20 0.9 MW 0.9 MW
274767 LEE CO EC;8U 80/20 0.9 MW 0.9 MW
943121 AE2-341 C 80/20 9.74 MW 9.74 MW
943591 AF1-030 C 80/20 6.48 MW 6.48 MW
959091 AF2-200 C 80/20 17.57 MW 17.57 MW
959101 AF2-201 C Adder 2.85 MW 2.42 MW
960381 AF2-329 C 80/20 4.09 MW 4.09 MW
960721 AF2-363 C 80/20 3.86 MW 3.86 MW
961011 AF2-392 C 80/20 2.62 MW 2.62 MW
961021 AF2-393 C 80/20 4.09 MW 4.09 MW
961031 AF2-394 C 80/20 2.97 MW 2.97 MW
930481 AB1-089 C Adder 33.8 MW 28.73 MW
938861 AE1-114 C 80/20 2.14 MW 2.14 MW
946321 AF1-296 C Adder 2.14 MW 1.82 MW
946671 AF1-331 C 80/20 1.81 MW 1.81 MW
962691 AG1-118 C 80/20 18.63 MW 18.63 MW
962711 AG1-120 C 80/20 5.62 MW 5.62 MW
965661 AG1-434 C 80/20 4.57 MW 4.57 MW
965931 AG1-462 C Adder 8.68 MW 7.38 MW
945351 AF1-200 FTIR 80/20 155.69 MW 155.69 MW
955972 J1084 External Queue 7.6 MW 7.6 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 8.41 MW 8.41 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.5 MW 2.5 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.16 MW 0.16 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.07 MW 0.07 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.03 MW 0.03 MW
TVA LTFEXP_TVA->PJM CLTF 0.29 MW 0.29 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.12 MW 0.12 MW
MEC LTFEXP_MEC->PJM CLTF 3.92 MW 3.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.36 MW 0.36 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.82 MW 0.82 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

Details for GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-1
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-1'
 TRIP BRANCH FROM BUS 270678 TO BUS 930480 CKT 1   /*BYRON    ; B 345.0 - AB1-089 TP   345.0
END
Single AC 105.93 1568.0 STE 1660.97 7.04
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-1
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-1'
 TRIP BRANCH FROM BUS 270678 TO BUS 930480 CKT 1   /*BYRON    ; B 345.0 - AB1-089 TP   345.0
END
Single AC 104.21 1568.0 STE 1634.0 7.04
Topology Case Flowgate Details for GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C 80/20 4.91 MW 4.91 MW
933911 AD1-013 C 80/20 1.43 MW 1.43 MW
937001 AD2-134 C 80/20 0.3 MW 0.3 MW
942991 AE2-321 C 80/20 3.92 MW 3.92 MW
943801 AF1-048 C 80/20 1.83 MW 1.83 MW
959081 AF2-199 C 80/20 3.52 MW 3.52 MW
960751 AF2-366 C 80/20 4.89 MW 4.89 MW
274656 BYRON ;1U 80/20 44.92 MW 44.92 MW
274657 BYRON ;2U 80/20 43.93 MW 43.93 MW
274662 QUAD CITI;1U 80/20 13.83 MW 13.83 MW
274663 QUAD CITI;2U 80/20 13.88 MW 13.88 MW
274699 CORDOVA ;1C 80/20 2.43 MW 2.43 MW
274700 CORDOVA ;2C 80/20 2.43 MW 2.43 MW
274701 CORDOVA ;1S 80/20 2.74 MW 2.74 MW
274715 NELSON EC;1C 80/20 3.23 MW 3.23 MW
274716 NELSON EC;1S 80/20 2.35 MW 2.35 MW
274717 NELSON EC;2C 80/20 3.25 MW 3.25 MW
274718 NELSON EC;2S 80/20 2.37 MW 2.37 MW
274822 ROCKFORD ;11 80/20 6.55 MW 6.55 MW
274823 ROCKFORD ;21 80/20 6.59 MW 6.59 MW
274824 ROCKFORD ;12 80/20 6.5 MW 6.5 MW
274855 GSG-6 ;RU 80/20 0.31 MW 0.31 MW
274856 ECOGROVE ;U1 80/20 0.61 MW 0.61 MW
274857 BIG SKY ;U1 80/20 0.41 MW 0.41 MW
274858 BIG SKY ;U2 80/20 0.41 MW 0.41 MW
276156 O-029 C 80/20 0.18 MW 0.18 MW
276157 O-029 C 80/20 0.32 MW 0.32 MW
276158 O-029 C 80/20 0.32 MW 0.32 MW
276590 R-018 80/20 0.24 MW 0.24 MW
939051 AE1-134 1 80/20 0.23 MW 0.23 MW
939061 AE1-134 2 80/20 1.54 MW 1.54 MW
946501 AF1-314 C 80/20 7.74 MW 7.74 MW
946661 AF1-330 C 80/20 0.88 MW 0.88 MW
957471 AF2-041 C 80/20 10.57 MW 10.57 MW
274760 LEE CO EC;1U 80/20 2.28 MW 2.28 MW
274881 WALNUT RG;1U 80/20 0.68 MW 0.68 MW
276602 WESTBROOK C 80/20 0.1 MW 0.1 MW
276603 SUBLETTE C 80/20 0.05 MW 0.05 MW
276611 AD2-172 C 80/20 0.66 MW 0.66 MW
276612 AE2-035 C 80/20 0.66 MW 0.66 MW
276676 AA2-030 GEN 80/20 3.01 MW 3.01 MW
276677 AA1-146 80/20 3.64 MW 3.64 MW
276678 AD1-016 C 80/20 0.47 MW 0.47 MW
276679 AD1-129 C 80/20 1.27 MW 1.27 MW
274872 LEE DEKAL;1U 80/20 0.48 MW 0.48 MW
274850 MENDOTA H;RU 80/20 0.2 MW 0.2 MW
274761 LEE CO EC;2U 80/20 2.28 MW 2.28 MW
274762 LEE CO EC;3U 80/20 2.28 MW 2.28 MW
274763 LEE CO EC;4U 80/20 2.25 MW 2.25 MW
274764 LEE CO EC;5U 80/20 2.28 MW 2.28 MW
274765 LEE CO EC;6U 80/20 2.28 MW 2.28 MW
274766 LEE CO EC;7U 80/20 2.25 MW 2.25 MW
274767 LEE CO EC;8U 80/20 2.25 MW 2.25 MW
959091 AF2-200 C 80/20 7.04 MW 7.04 MW
959101 AF2-201 C 80/20 10.69 MW 10.69 MW
960721 AF2-363 C 80/20 7.5 MW 7.5 MW
961011 AF2-392 C 80/20 4.48 MW 4.48 MW
961021 AF2-393 C 80/20 7.0 MW 7.0 MW
961031 AF2-394 C 80/20 5.09 MW 5.09 MW
938861 AE1-114 C 80/20 6.01 MW 6.01 MW
946321 AF1-296 C 80/20 3.87 MW 3.87 MW
946671 AF1-331 C 80/20 1.85 MW 1.85 MW
962691 AG1-118 C 80/20 12.3 MW 12.3 MW
962711 AG1-120 C 80/20 10.92 MW 10.92 MW
965661 AG1-434 C 80/20 2.66 MW 2.66 MW
965931 AG1-462 C 80/20 15.35 MW 15.35 MW
955972 J1084 External Queue 10.99 MW 10.99 MW
956412 J1131 External Queue 5.82 MW 5.82 MW
956832 J1181 C External Queue 1.66 MW 1.66 MW
990117 J1214 G External Queue 38.33 MW 38.33 MW
990407 J1304 G External Queue 9.34 MW 9.34 MW
990512 J1326 G External Queue 9.6 MW 9.6 MW
990727 J1377 G External Queue 16.4 MW 16.4 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
991092 J1477 External Queue 2.91 MW 2.91 MW
991392 J1884 External Queue 17.87 MW 17.87 MW
991667 J2272 External Queue 15.58 MW 15.58 MW
991687 J2304 G External Queue 43.39 MW 43.39 MW
991777 J1629 G External Queue 10.92 MW 10.92 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.74 MW 59.74 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.71 MW 6.71 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.05 MW 0.05 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.81 MW 9.81 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.28 MW 2.28 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

Details for CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-1
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-1'
 TRIP BRANCH FROM BUS 270678 TO BUS 930480 CKT 1   /*BYRON    ; B 345.0 - AB1-089 TP   345.0
END
Single AC 105.93 1568.0 STE 1660.97 7.04
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-1
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-1'
 TRIP BRANCH FROM BUS 270678 TO BUS 930480 CKT 1   /*BYRON    ; B 345.0 - AB1-089 TP   345.0
END
Single AC 104.21 1568.0 STE 1634.0 7.04
Topology Case Flowgate Details for CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-1
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C 80/20 4.91 MW 4.91 MW
933911 AD1-013 C 80/20 1.43 MW 1.43 MW
937001 AD2-134 C 80/20 0.3 MW 0.3 MW
942991 AE2-321 C 80/20 3.92 MW 3.92 MW
943801 AF1-048 C 80/20 1.83 MW 1.83 MW
959081 AF2-199 C 80/20 3.52 MW 3.52 MW
960751 AF2-366 C 80/20 4.89 MW 4.89 MW
274656 BYRON ;1U 80/20 44.92 MW 44.92 MW
274657 BYRON ;2U 80/20 43.93 MW 43.93 MW
274662 QUAD CITI;1U 80/20 13.83 MW 13.83 MW
274663 QUAD CITI;2U 80/20 13.88 MW 13.88 MW
274699 CORDOVA ;1C 80/20 2.43 MW 2.43 MW
274700 CORDOVA ;2C 80/20 2.43 MW 2.43 MW
274701 CORDOVA ;1S 80/20 2.74 MW 2.74 MW
274715 NELSON EC;1C 80/20 3.23 MW 3.23 MW
274716 NELSON EC;1S 80/20 2.35 MW 2.35 MW
274717 NELSON EC;2C 80/20 3.25 MW 3.25 MW
274718 NELSON EC;2S 80/20 2.37 MW 2.37 MW
274822 ROCKFORD ;11 80/20 6.55 MW 6.55 MW
274823 ROCKFORD ;21 80/20 6.59 MW 6.59 MW
274824 ROCKFORD ;12 80/20 6.5 MW 6.5 MW
274855 GSG-6 ;RU 80/20 0.31 MW 0.31 MW
274856 ECOGROVE ;U1 80/20 0.61 MW 0.61 MW
274857 BIG SKY ;U1 80/20 0.41 MW 0.41 MW
274858 BIG SKY ;U2 80/20 0.41 MW 0.41 MW
276156 O-029 C 80/20 0.18 MW 0.18 MW
276157 O-029 C 80/20 0.32 MW 0.32 MW
276158 O-029 C 80/20 0.32 MW 0.32 MW
276590 R-018 80/20 0.24 MW 0.24 MW
939051 AE1-134 1 80/20 0.23 MW 0.23 MW
939061 AE1-134 2 80/20 1.54 MW 1.54 MW
946501 AF1-314 C 80/20 7.74 MW 7.74 MW
946661 AF1-330 C 80/20 0.88 MW 0.88 MW
957471 AF2-041 C 80/20 10.57 MW 10.57 MW
274760 LEE CO EC;1U 80/20 2.28 MW 2.28 MW
274881 WALNUT RG;1U 80/20 0.68 MW 0.68 MW
276602 WESTBROOK C 80/20 0.1 MW 0.1 MW
276603 SUBLETTE C 80/20 0.05 MW 0.05 MW
276611 AD2-172 C 80/20 0.66 MW 0.66 MW
276612 AE2-035 C 80/20 0.66 MW 0.66 MW
276676 AA2-030 GEN 80/20 3.01 MW 3.01 MW
276677 AA1-146 80/20 3.64 MW 3.64 MW
276678 AD1-016 C 80/20 0.47 MW 0.47 MW
276679 AD1-129 C 80/20 1.27 MW 1.27 MW
274872 LEE DEKAL;1U 80/20 0.48 MW 0.48 MW
274850 MENDOTA H;RU 80/20 0.2 MW 0.2 MW
274761 LEE CO EC;2U 80/20 2.28 MW 2.28 MW
274762 LEE CO EC;3U 80/20 2.28 MW 2.28 MW
274763 LEE CO EC;4U 80/20 2.25 MW 2.25 MW
274764 LEE CO EC;5U 80/20 2.28 MW 2.28 MW
274765 LEE CO EC;6U 80/20 2.28 MW 2.28 MW
274766 LEE CO EC;7U 80/20 2.25 MW 2.25 MW
274767 LEE CO EC;8U 80/20 2.25 MW 2.25 MW
959091 AF2-200 C 80/20 7.04 MW 7.04 MW
959101 AF2-201 C 80/20 10.69 MW 10.69 MW
960721 AF2-363 C 80/20 7.5 MW 7.5 MW
961011 AF2-392 C 80/20 4.48 MW 4.48 MW
961021 AF2-393 C 80/20 7.0 MW 7.0 MW
961031 AF2-394 C 80/20 5.09 MW 5.09 MW
938861 AE1-114 C 80/20 6.01 MW 6.01 MW
946321 AF1-296 C 80/20 3.87 MW 3.87 MW
946671 AF1-331 C 80/20 1.85 MW 1.85 MW
962691 AG1-118 C 80/20 12.3 MW 12.3 MW
962711 AG1-120 C 80/20 10.92 MW 10.92 MW
965661 AG1-434 C 80/20 2.66 MW 2.66 MW
965931 AG1-462 C 80/20 15.35 MW 15.35 MW
955972 J1084 External Queue 10.99 MW 10.99 MW
956412 J1131 External Queue 5.82 MW 5.82 MW
956832 J1181 C External Queue 1.66 MW 1.66 MW
990117 J1214 G External Queue 38.33 MW 38.33 MW
990407 J1304 G External Queue 9.34 MW 9.34 MW
990512 J1326 G External Queue 9.6 MW 9.6 MW
990727 J1377 G External Queue 16.4 MW 16.4 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
991092 J1477 External Queue 2.91 MW 2.91 MW
991392 J1884 External Queue 17.87 MW 17.87 MW
991667 J2272 External Queue 15.58 MW 15.58 MW
991687 J2304 G External Queue 43.39 MW 43.39 MW
991777 J1629 G External Queue 10.92 MW 10.92 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.74 MW 59.74 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.71 MW 6.71 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.05 MW 0.05 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.81 MW 9.81 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.28 MW 2.28 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

Details for AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
Base Case Single AC 109.81 1334.0 A 1464.93 64.89
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
Base Case Single AC 108.77 1334.0 A 1451.05 64.9
Topology Case Flowgate Details for AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
933911 AD1-013 C 80/20 1.09 MW 1.09 MW
937001 AD2-134 C 80/20 0.23 MW 0.23 MW
959081 AF2-199 C 80/20 32.45 MW 32.45 MW
274656 BYRON ;1U 80/20 16.83 MW 16.83 MW
274657 BYRON ;2U 80/20 16.4 MW 16.4 MW
274662 QUAD CITI;1U 80/20 24.02 MW 24.02 MW
274663 QUAD CITI;2U 80/20 24.11 MW 24.11 MW
274699 CORDOVA ;1C 80/20 4.24 MW 4.24 MW
274700 CORDOVA ;2C 80/20 4.24 MW 4.24 MW
274701 CORDOVA ;1S 80/20 4.77 MW 4.77 MW
274715 NELSON EC;1C 80/20 6.17 MW 6.17 MW
274716 NELSON EC;1S 80/20 4.5 MW 4.5 MW
274717 NELSON EC;2C 80/20 6.21 MW 6.21 MW
274718 NELSON EC;2S 80/20 4.54 MW 4.54 MW
274822 ROCKFORD ;11 80/20 2.06 MW 2.06 MW
274823 ROCKFORD ;21 80/20 2.07 MW 2.07 MW
274824 ROCKFORD ;12 80/20 2.04 MW 2.04 MW
274848 CAMPGROVE;RU 80/20 0.15 MW 0.15 MW
274849 CRESCENT ;1U 80/20 0.1 MW 0.1 MW
274851 PROVIDENC;RU 80/20 0.11 MW 0.11 MW
274855 GSG-6 ;RU 80/20 0.25 MW 0.25 MW
274856 ECOGROVE ;U1 80/20 0.31 MW 0.31 MW
274857 BIG SKY ;U1 80/20 0.42 MW 0.42 MW
274858 BIG SKY ;U2 80/20 0.42 MW 0.42 MW
274877 BISHOP HL;1U 80/20 0.25 MW 0.25 MW
274878 BISHOP HL;2U 80/20 0.25 MW 0.25 MW
276156 O-029 C 80/20 0.3 MW 0.3 MW
276157 O-029 C 80/20 0.54 MW 0.54 MW
276158 O-029 C 80/20 0.54 MW 0.54 MW
276590 R-018 80/20 0.07 MW 0.07 MW
925581 AC1-033 C 80/20 0.17 MW 0.17 MW
939051 AE1-134 1 80/20 0.44 MW 0.44 MW
939061 AE1-134 2 80/20 2.94 MW 2.94 MW
946501 AF1-314 C 80/20 3.96 MW 3.96 MW
957471 AF2-041 C 80/20 97.34 MW 97.34 MW
274760 LEE CO EC;1U 80/20 2.36 MW 2.36 MW
274881 WALNUT RG;1U 80/20 1.14 MW 1.14 MW
276602 WESTBROOK C 80/20 0.08 MW 0.08 MW
276603 SUBLETTE C 80/20 0.04 MW 0.04 MW
276611 AD2-172 C 80/20 0.34 MW 0.34 MW
276612 AE2-035 C 80/20 0.34 MW 0.34 MW
276645 AC1-214 C1 80/20 0.09 MW 0.09 MW
276646 AC1-214 C2 80/20 0.09 MW 0.09 MW
276676 AA2-030 GEN 80/20 5.75 MW 5.75 MW
276677 AA1-146 80/20 6.96 MW 6.96 MW
276679 AD1-129 C 80/20 0.41 MW 0.41 MW
957751 AF2-069 C 80/20 0.15 MW 0.15 MW
274850 MENDOTA H;RU 80/20 0.16 MW 0.16 MW
274761 LEE CO EC;2U 80/20 2.36 MW 2.36 MW
274762 LEE CO EC;3U 80/20 2.36 MW 2.36 MW
274763 LEE CO EC;4U 80/20 2.34 MW 2.34 MW
274764 LEE CO EC;5U 80/20 2.37 MW 2.37 MW
274765 LEE CO EC;6U 80/20 2.37 MW 2.37 MW
274766 LEE CO EC;7U 80/20 2.33 MW 2.33 MW
274767 LEE CO EC;8U 80/20 2.33 MW 2.33 MW
934051 AD1-031 C 80/20 2.19 MW 2.19 MW
959091 AF2-200 C 80/20 64.89 MW 64.89 MW
959101 AF2-201 C 80/20 5.47 MW 5.47 MW
961011 AF2-392 C 80/20 7.15 MW 7.15 MW
961021 AF2-393 C 80/20 11.17 MW 11.17 MW
961031 AF2-394 C 80/20 8.13 MW 8.13 MW
930481 AB1-089 C 80/20 41.08 MW 41.08 MW
938861 AE1-114 C 80/20 4.69 MW 4.69 MW
946321 AF1-296 C 80/20 6.39 MW 6.39 MW
946671 AF1-331 C 80/20 1.42 MW 1.42 MW
957761 AF2-070 C 80/20 0.21 MW 0.21 MW
965661 AG1-434 C 80/20 16.41 MW 16.41 MW
965671 AG1-435 C 80/20 2.51 MW 2.51 MW
965931 AG1-462 C 80/20 26.75 MW 26.75 MW
955972 J1084 External Queue 20.95 MW 20.95 MW
956412 J1131 External Queue 10.98 MW 10.98 MW
956832 J1181 C External Queue 2.06 MW 2.06 MW
990947 J1432 C External Queue 4.71 MW 4.71 MW
991092 J1477 External Queue 5.5 MW 5.5 MW
991667 J2272 External Queue 27.47 MW 27.47 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 63.35 MW 63.35 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.34 MW 11.34 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 2.91 MW 2.91 MW
NY PJM->LTFIMP_NY CLTF 0.21 MW 0.21 MW
WEC LTFEXP_WEC->PJM CLTF 0.66 MW 0.66 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.12 MW 0.12 MW
TVA LTFEXP_TVA->PJM CLTF 1.68 MW 1.68 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.08 MW 0.08 MW
MEC LTFEXP_MEC->PJM CLTF 13.46 MW 13.46 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.2 MW 0.2 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.57 MW 3.57 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.03 MW 0.03 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.06 MW 0.06 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L11120_R-N_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P1-2_345-L11120_R-N_SRT-A
CONTINGENCY 'COMED_P1-2_345-L11120_R-N_SRT-A'
 MOVE 100 PERCENT LOAD FROM BUS 270749 TO BUS 270751   /*ESS W407M; R 345.0 - ESS W407M;9T 345.0
 TRIP BRANCH FROM BUS 270733 TO BUS 270747 CKT 1       /*ELECT JCT;3R 345.0 - ESS W407K;0T 345.0
 TRIP BRANCH FROM BUS 270747 TO BUS 270753 CKT 1       /*ESS W407K;0T 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270749 CKT 1       /*ESS W407M;0T 345.0 - ESS W407M; R 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270813 CKT 1       /*ESS W407M;0T 345.0 - LOMBARD  ; R 345.0
END
Single AC 102.06 1568.0 STE 1600.22 18.16
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P1-2_345-L11120_R-N_SRT-A
CONTINGENCY 'COMED_P1-2_345-L11120_R-N_SRT-A'
 MOVE 100 PERCENT LOAD FROM BUS 270749 TO BUS 270751   /*ESS W407M; R 345.0 - ESS W407M;9T 345.0
 TRIP BRANCH FROM BUS 270733 TO BUS 270747 CKT 1       /*ELECT JCT;3R 345.0 - ESS W407K;0T 345.0
 TRIP BRANCH FROM BUS 270747 TO BUS 270753 CKT 1       /*ESS W407K;0T 345.0 - ESS W407M;0T 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270749 CKT 1       /*ESS W407M;0T 345.0 - ESS W407M; R 345.0
 TRIP BRANCH FROM BUS 270753 TO BUS 270813 CKT 1       /*ESS W407M;0T 345.0 - LOMBARD  ; R 345.0
END
Single AC 100.05 1568.0 STE 1568.73 18.14
Topology Case Flowgate Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L11120_R-N_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C 80/20 6.01 MW 6.01 MW
966441 AG1-513 C 80/20 0.4 MW 0.4 MW
933911 AD1-013 C 80/20 1.52 MW 1.52 MW
937001 AD2-134 C 80/20 0.31 MW 0.31 MW
959081 AF2-199 C 80/20 9.08 MW 9.08 MW
960751 AF2-366 C 80/20 6.0 MW 6.0 MW
274715 NELSON EC;1C 80/20 2.13 MW 2.13 MW
274716 NELSON EC;1S 80/20 1.56 MW 1.56 MW
274717 NELSON EC;2C 80/20 2.15 MW 2.15 MW
274718 NELSON EC;2S 80/20 1.57 MW 1.57 MW
274737 AURORA EC;1P 80/20 2.07 MW 2.07 MW
274738 AURORA EC;3P 80/20 4.3 MW 4.3 MW
274739 AURORA EC;2P 80/20 2.07 MW 2.07 MW
274740 AURORA EC;4P 80/20 4.3 MW 4.3 MW
274741 AURORA EC;5P 80/20 0.76 MW 0.76 MW
274742 AURORA EC;6P 80/20 0.76 MW 0.76 MW
274743 AURORA EC;7P 80/20 0.76 MW 0.76 MW
274744 AURORA EC;8P 80/20 0.76 MW 0.76 MW
274745 AURORA EC;9P 80/20 0.76 MW 0.76 MW
274746 AURORA EC;0P 80/20 0.76 MW 0.76 MW
274818 ELGIN EC ;1P 80/20 1.67 MW 1.67 MW
274819 ELGIN EC ;3P 80/20 1.52 MW 1.52 MW
274820 ELGIN EC ;2P 80/20 1.67 MW 1.67 MW
274821 ELGIN EC ;4P 80/20 1.54 MW 1.54 MW
274855 GSG-6 ;RU 80/20 0.33 MW 0.33 MW
939051 AE1-134 1 80/20 0.15 MW 0.15 MW
939061 AE1-134 2 80/20 1.02 MW 1.02 MW
946501 AF1-314 C Adder 2.22 MW 1.89 MW
957471 AF2-041 C 80/20 27.24 MW 27.24 MW
274760 LEE CO EC;1U 80/20 0.97 MW 0.97 MW
276602 WESTBROOK C 80/20 0.11 MW 0.11 MW
276603 SUBLETTE C 80/20 0.05 MW 0.05 MW
276676 AA2-030 GEN 80/20 1.99 MW 1.99 MW
276677 AA1-146 80/20 2.41 MW 2.41 MW
276679 AD1-129 C Adder 0.39 MW 0.33 MW
274872 LEE DEKAL;1U 80/20 0.64 MW 0.64 MW
274850 MENDOTA H;RU 80/20 0.21 MW 0.21 MW
274761 LEE CO EC;2U 80/20 0.97 MW 0.97 MW
274762 LEE CO EC;3U 80/20 0.97 MW 0.97 MW
274763 LEE CO EC;4U 80/20 0.96 MW 0.96 MW
274764 LEE CO EC;5U 80/20 0.97 MW 0.97 MW
274765 LEE CO EC;6U 80/20 0.97 MW 0.97 MW
943121 AE2-341 C 80/20 11.04 MW 11.04 MW
943591 AF1-030 C 80/20 7.34 MW 7.34 MW
959091 AF2-200 C 80/20 18.16 MW 18.16 MW
959101 AF2-201 C Adder 3.07 MW 2.61 MW
960381 AF2-329 C 80/20 4.63 MW 4.63 MW
960721 AF2-363 C 80/20 4.21 MW 4.21 MW
961011 AF2-392 C 80/20 2.76 MW 2.76 MW
961021 AF2-393 C 80/20 4.32 MW 4.32 MW
961031 AF2-394 C 80/20 3.14 MW 3.14 MW
930481 AB1-089 C Adder 37.83 MW 32.16 MW
938861 AE1-114 C Adder 2.28 MW 1.94 MW
946321 AF1-296 C Adder 2.24 MW 1.91 MW
946671 AF1-331 C 80/20 1.97 MW 1.97 MW
962691 AG1-118 C 80/20 20.32 MW 20.32 MW
962711 AG1-120 C 80/20 6.14 MW 6.14 MW
965661 AG1-434 C 80/20 4.73 MW 4.73 MW
965931 AG1-462 C Adder 9.09 MW 7.72 MW
945351 AF1-200 FTIR 80/20 190.36 MW 190.36 MW
955972 J1084 External Queue 8.1 MW 8.1 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 6.2 MW 6.2 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.55 MW 2.55 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.18 MW 0.18 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.08 MW 0.08 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.04 MW 0.04 MW
TVA LTFEXP_TVA->PJM CLTF 0.28 MW 0.28 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.14 MW 0.14 MW
MEC LTFEXP_MEC->PJM CLTF 4.0 MW 4.0 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.41 MW 0.41 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.82 MW 0.82 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.12 MW 0.12 MW

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 105.88 1841.0 B 1949.29 16.77
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 181.22 1075.0 B 1948.12 16.14
Topology Case Flowgate Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 8.24 MW 7.0 MW
965091 AG1-374 C Adder 19.91 MW 16.93 MW
965681 AG1-436 C Adder 9.25 MW 7.86 MW
966091 AG1-478 C Adder 2.49 MW 2.11 MW
966431 AG1-512 C Adder 2.42 MW 2.06 MW
966441 AG1-513 C Adder 0.6 MW 0.51 MW
933911 AD1-013 C Adder 2.18 MW 1.85 MW
934721 AD1-100 C Adder 23.19 MW 19.71 MW
942111 AE2-223 C Adder 2.26 MW 1.92 MW
942991 AE2-321 C Adder 9.62 MW 8.18 MW
943801 AF1-048 C Adder 4.5 MW 3.82 MW
958481 AF2-142 C Adder 13.34 MW 11.34 MW
958491 AF2-143 C Adder 12.97 MW 11.03 MW
959081 AF2-199 C Adder 8.38 MW 7.12 MW
959341 AF2-225 C Adder 7.3 MW 6.21 MW
959351 AF2-226 C Adder 2.98 MW 2.53 MW
959611 AF2-252 C Adder 2.21 MW 1.88 MW
960281 AF2-319 C Adder 2.98 MW 2.53 MW
960611 AF2-352 C Adder 2.21 MW 1.88 MW
960681 AF2-359 C Adder 9.25 MW 7.86 MW
960751 AF2-366 C Adder 8.21 MW 6.98 MW
274675 JOLIET 29;7U Adder 85.72 MW 72.86 MW
274676 JOLIET 29;8U Adder 84.16 MW 71.54 MW
274682 WAUKEGAN ;7U Adder 48.6 MW 41.31 MW
274683 WAUKEGAN ;8U Adder 52.4 MW 44.54 MW
274687 WILL CNTY;4U Adder 80.77 MW 68.65 MW
274723 RIVER EC ;12 80/20 4.83 MW 4.83 MW
274724 RIVER EC ;11 80/20 4.83 MW 4.83 MW
274770 LINCOLN ;1U 80/20 1.89 MW 1.89 MW
274775 LINCOLN ;6U 80/20 1.89 MW 1.89 MW
274777 LINCOLN ;8U 80/20 1.89 MW 1.89 MW
274788 SE CHICAG;5U 80/20 7.3 MW 7.3 MW
274789 SE CHICAG;6U 80/20 7.3 MW 7.3 MW
274790 SE CHICAG;7U 80/20 7.3 MW 7.3 MW
274791 SE CHICAG;8U 80/20 7.3 MW 7.3 MW
274792 SE CHICAG;9U 80/20 7.22 MW 7.22 MW
274793 SE CHICAG;0U 80/20 7.22 MW 7.22 MW
274794 SE CHICAG;1U 80/20 7.22 MW 7.22 MW
274795 SE CHICAG;2U 80/20 7.22 MW 7.22 MW
274798 UNIV PARK;1U 80/20 1.36 MW 1.36 MW
274799 UNIV PARK;2U 80/20 1.35 MW 1.35 MW
274800 UNIV PARK;3U 80/20 1.35 MW 1.35 MW
274801 UNIV PARK;4U 80/20 1.35 MW 1.35 MW
274826 FISK ;BP 80/20 2.56 MW 2.56 MW
274827 FISK ;RP 80/20 1.81 MW 1.81 MW
274887 PILOT HIL;1U 80/20 0.87 MW 0.87 MW
274888 KELLY CRK;1U 80/20 0.87 MW 0.87 MW
276164 X3-005 C 80/20 0.09 MW 0.09 MW
933411 AC2-154 C 80/20 3.1 MW 3.1 MW
938511 AE1-070 1 Adder 10.86 MW 9.23 MW
938521 AE1-070 2 Adder 9.93 MW 8.44 MW
939061 AE1-134 2 Adder 1.61 MW 1.37 MW
946501 AF1-314 C Adder 5.11 MW 4.35 MW
946661 AF1-330 C Adder 2.36 MW 2.0 MW
957331 AF2-027 C Adder 2.94 MW 2.5 MW
957401 AF2-034 C Adder 1.66 MW 1.41 MW
957471 AF2-041 C Adder 25.15 MW 21.38 MW
958021 AF2-096 C Adder 27.99 MW 23.79 MW
274674 JOLIET 9 ;6U Adder 44.02 MW 37.42 MW
938851 AE1-113 C Adder 9.39 MW 7.98 MW
934101 AD2-000 1 Adder 6.8 MW 5.78 MW
934111 AD2-000 2 Adder 7.07 MW 6.01 MW
276678 AD1-016 C Adder 1.09 MW 0.93 MW
276679 AD1-129 C Adder 1.06 MW 0.9 MW
957751 AF2-069 C Adder 0.28 MW 0.24 MW
926821 AC1-168 C Adder 1.34 MW 1.14 MW
934051 AD1-031 C Adder 3.36 MW 2.85 MW
936291 AD2-038 C Adder 3.81 MW 3.23 MW
936371 AD2-047 C 80/20 5.55 MW 5.55 MW
936461 AD2-060 C 80/20 3.27 MW 3.27 MW
936511 AD2-066 C Adder 9.92 MW 8.44 MW
942421 AE2-255 C Adder 3.56 MW 3.02 MW
942651 AE2-281 C Adder 1.01 MW 0.86 MW
943121 AE2-341 C Adder 15.04 MW 12.78 MW
943591 AF1-030 C Adder 10.0 MW 8.5 MW
959091 AF2-200 C Adder 16.77 MW 14.25 MW
959101 AF2-201 C Adder 7.06 MW 6.0 MW
960381 AF2-329 C Adder 6.31 MW 5.36 MW
960591 AF2-350 C 80/20 9.8 MW 9.8 MW
960721 AF2-363 C Adder 6.96 MW 5.92 MW
961011 AF2-392 C Adder 4.66 MW 3.96 MW
961021 AF2-393 C Adder 7.29 MW 6.2 MW
961031 AF2-394 C Adder 5.3 MW 4.5 MW
961501 AF2-441 C 80/20 15.11 MW 15.11 MW
961651 AG1-005 C Adder 15.42 MW 13.11 MW
930481 AB1-089 C Adder 77.14 MW 65.57 MW
938861 AE1-114 C Adder 4.62 MW 3.93 MW
939321 AE1-163 C Adder 7.06 MW 6.0 MW
939351 AE1-166 C Adder 12.06 MW 10.25 MW
939401 AE1-172 C Adder 6.34 MW 5.39 MW
939741 AE1-205 C Adder 9.73 MW 8.27 MW
946321 AF1-296 C Adder 4.65 MW 3.96 MW
946671 AF1-331 C Adder 2.83 MW 2.4 MW
962691 AG1-118 C Adder 26.08 MW 22.17 MW
962711 AG1-120 C Adder 10.15 MW 8.62 MW
964361 AG1-298 C 80/20 94.54 MW 94.54 MW
941551 AE2-152 C Adder 13.91 MW 11.83 MW
941731 AE2-173 C Adder 5.79 MW 4.92 MW
957371 AF2-031 C 80/20 1.57 MW 1.57 MW
957761 AF2-070 C Adder 0.39 MW 0.34 MW
958011 AF2-095 C 80/20 15.68 MW 15.68 MW
965661 AG1-434 C Adder 4.85 MW 4.12 MW
965671 AG1-435 C Adder 4.47 MW 3.8 MW
965791 AG1-447 C Adder 6.78 MW 5.76 MW
965931 AG1-462 C Adder 18.87 MW 16.04 MW
945351 AF1-200 FTIR Adder 363.95 MW 309.36 MW
990547 J1333 G External Queue 31.63 MW 31.63 MW
990647 J1355 External Queue 41.73 MW 41.73 MW
991377 J1861 G External Queue 12.25 MW 12.25 MW
991572 J2187 External Queue 39.47 MW 39.47 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 121.55 MW 121.55 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 19.4 MW 19.4 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.31 MW 1.31 MW
WEC LTFEXP_WEC->PJM CLTF 4.6 MW 4.6 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.6 MW 0.6 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.3 MW 0.3 MW
TVA LTFEXP_TVA->PJM CLTF 1.82 MW 1.82 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.56 MW 0.56 MW
MEC LTFEXP_MEC->PJM CLTF 15.5 MW 15.5 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.57 MW 1.57 MW
LAGN LTFEXP_LAGN->PJM CLTF 4.44 MW 4.44 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.89 MW 0.89 MW

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 105.88 1841.0 B 1949.25 16.77
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 181.22 1075.0 B 1948.07 16.14
Topology Case Flowgate Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 8.24 MW 7.0 MW
965091 AG1-374 C Adder 19.91 MW 16.93 MW
965681 AG1-436 C Adder 9.25 MW 7.86 MW
966091 AG1-478 C Adder 2.49 MW 2.11 MW
966431 AG1-512 C Adder 2.42 MW 2.06 MW
966441 AG1-513 C Adder 0.6 MW 0.51 MW
933911 AD1-013 C Adder 2.18 MW 1.85 MW
934721 AD1-100 C Adder 23.19 MW 19.71 MW
942111 AE2-223 C Adder 2.26 MW 1.92 MW
942991 AE2-321 C Adder 9.62 MW 8.18 MW
943801 AF1-048 C Adder 4.5 MW 3.82 MW
958481 AF2-142 C Adder 13.34 MW 11.34 MW
958491 AF2-143 C Adder 12.97 MW 11.03 MW
959081 AF2-199 C Adder 8.38 MW 7.12 MW
959341 AF2-225 C Adder 7.3 MW 6.21 MW
959351 AF2-226 C Adder 2.98 MW 2.53 MW
959611 AF2-252 C Adder 2.21 MW 1.88 MW
960281 AF2-319 C Adder 2.98 MW 2.53 MW
960611 AF2-352 C Adder 2.21 MW 1.88 MW
960681 AF2-359 C Adder 9.25 MW 7.86 MW
960751 AF2-366 C Adder 8.21 MW 6.98 MW
274675 JOLIET 29;7U Adder 85.72 MW 72.86 MW
274676 JOLIET 29;8U Adder 84.16 MW 71.54 MW
274682 WAUKEGAN ;7U Adder 48.6 MW 41.31 MW
274683 WAUKEGAN ;8U Adder 52.4 MW 44.54 MW
274687 WILL CNTY;4U Adder 80.77 MW 68.65 MW
274723 RIVER EC ;12 80/20 4.83 MW 4.83 MW
274724 RIVER EC ;11 80/20 4.83 MW 4.83 MW
274770 LINCOLN ;1U 80/20 1.89 MW 1.89 MW
274775 LINCOLN ;6U 80/20 1.89 MW 1.89 MW
274777 LINCOLN ;8U 80/20 1.89 MW 1.89 MW
274788 SE CHICAG;5U 80/20 7.3 MW 7.3 MW
274789 SE CHICAG;6U 80/20 7.3 MW 7.3 MW
274790 SE CHICAG;7U 80/20 7.3 MW 7.3 MW
274791 SE CHICAG;8U 80/20 7.3 MW 7.3 MW
274792 SE CHICAG;9U 80/20 7.22 MW 7.22 MW
274793 SE CHICAG;0U 80/20 7.22 MW 7.22 MW
274794 SE CHICAG;1U 80/20 7.22 MW 7.22 MW
274795 SE CHICAG;2U 80/20 7.22 MW 7.22 MW
274798 UNIV PARK;1U 80/20 1.36 MW 1.36 MW
274799 UNIV PARK;2U 80/20 1.35 MW 1.35 MW
274800 UNIV PARK;3U 80/20 1.35 MW 1.35 MW
274801 UNIV PARK;4U 80/20 1.35 MW 1.35 MW
274826 FISK ;BP 80/20 2.56 MW 2.56 MW
274827 FISK ;RP 80/20 1.81 MW 1.81 MW
274887 PILOT HIL;1U 80/20 0.87 MW 0.87 MW
274888 KELLY CRK;1U 80/20 0.87 MW 0.87 MW
276164 X3-005 C 80/20 0.09 MW 0.09 MW
933411 AC2-154 C 80/20 3.1 MW 3.1 MW
938511 AE1-070 1 Adder 10.86 MW 9.23 MW
938521 AE1-070 2 Adder 9.93 MW 8.44 MW
939061 AE1-134 2 Adder 1.61 MW 1.37 MW
946501 AF1-314 C Adder 5.11 MW 4.35 MW
946661 AF1-330 C Adder 2.36 MW 2.0 MW
957331 AF2-027 C Adder 2.94 MW 2.5 MW
957401 AF2-034 C Adder 1.66 MW 1.41 MW
957471 AF2-041 C Adder 25.15 MW 21.38 MW
958021 AF2-096 C Adder 27.99 MW 23.79 MW
274674 JOLIET 9 ;6U Adder 44.02 MW 37.42 MW
938851 AE1-113 C Adder 9.39 MW 7.98 MW
934101 AD2-000 1 Adder 6.8 MW 5.78 MW
934111 AD2-000 2 Adder 7.07 MW 6.01 MW
276678 AD1-016 C Adder 1.09 MW 0.93 MW
276679 AD1-129 C Adder 1.06 MW 0.9 MW
957751 AF2-069 C Adder 0.28 MW 0.24 MW
926821 AC1-168 C Adder 1.34 MW 1.14 MW
934051 AD1-031 C Adder 3.36 MW 2.85 MW
936291 AD2-038 C Adder 3.81 MW 3.23 MW
936371 AD2-047 C 80/20 5.55 MW 5.55 MW
936461 AD2-060 C 80/20 3.27 MW 3.27 MW
936511 AD2-066 C Adder 9.92 MW 8.44 MW
942421 AE2-255 C Adder 3.56 MW 3.02 MW
942651 AE2-281 C Adder 1.01 MW 0.86 MW
943121 AE2-341 C Adder 15.04 MW 12.78 MW
943591 AF1-030 C Adder 10.0 MW 8.5 MW
959091 AF2-200 C Adder 16.77 MW 14.25 MW
959101 AF2-201 C Adder 7.06 MW 6.0 MW
960381 AF2-329 C Adder 6.31 MW 5.36 MW
960591 AF2-350 C 80/20 9.8 MW 9.8 MW
960721 AF2-363 C Adder 6.96 MW 5.92 MW
961011 AF2-392 C Adder 4.66 MW 3.96 MW
961021 AF2-393 C Adder 7.29 MW 6.2 MW
961031 AF2-394 C Adder 5.3 MW 4.5 MW
961501 AF2-441 C 80/20 15.11 MW 15.11 MW
961651 AG1-005 C Adder 15.42 MW 13.11 MW
930481 AB1-089 C Adder 77.14 MW 65.57 MW
938861 AE1-114 C Adder 4.62 MW 3.93 MW
939321 AE1-163 C Adder 7.06 MW 6.0 MW
939351 AE1-166 C Adder 12.06 MW 10.25 MW
939401 AE1-172 C Adder 6.34 MW 5.39 MW
939741 AE1-205 C Adder 9.73 MW 8.27 MW
946321 AF1-296 C Adder 4.65 MW 3.96 MW
946671 AF1-331 C Adder 2.83 MW 2.4 MW
962691 AG1-118 C Adder 26.08 MW 22.17 MW
962711 AG1-120 C Adder 10.15 MW 8.62 MW
964361 AG1-298 C 80/20 94.54 MW 94.54 MW
941551 AE2-152 C Adder 13.91 MW 11.83 MW
941731 AE2-173 C Adder 5.79 MW 4.92 MW
957371 AF2-031 C 80/20 1.57 MW 1.57 MW
957761 AF2-070 C Adder 0.39 MW 0.34 MW
958011 AF2-095 C 80/20 15.68 MW 15.68 MW
965661 AG1-434 C Adder 4.85 MW 4.12 MW
965671 AG1-435 C Adder 4.47 MW 3.8 MW
965791 AG1-447 C Adder 6.78 MW 5.76 MW
965931 AG1-462 C Adder 18.87 MW 16.04 MW
945351 AF1-200 FTIR Adder 363.95 MW 309.36 MW
990547 J1333 G External Queue 31.63 MW 31.63 MW
990647 J1355 External Queue 41.73 MW 41.73 MW
991377 J1861 G External Queue 12.25 MW 12.25 MW
991572 J2187 External Queue 39.47 MW 39.47 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 121.55 MW 121.55 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 19.4 MW 19.4 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.31 MW 1.31 MW
WEC LTFEXP_WEC->PJM CLTF 4.6 MW 4.6 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.6 MW 0.6 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.3 MW 0.3 MW
TVA LTFEXP_TVA->PJM CLTF 1.82 MW 1.82 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.56 MW 0.56 MW
MEC LTFEXP_MEC->PJM CLTF 15.5 MW 15.5 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.57 MW 1.57 MW
LAGN LTFEXP_LAGN->PJM CLTF 4.44 MW 4.44 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.89 MW 0.89 MW

Details for GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
AEP/CE GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line
270771 to 243229 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 102.59 971.0 B 996.1 11.32
Addition
Topology Case Flowgate Details for GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.57 MW 4.74 MW
966091 AG1-478 C Adder 1.67 MW 1.42 MW
966431 AG1-512 C 80/20 2.65 MW 2.65 MW
966441 AG1-513 C Adder 0.41 MW 0.35 MW
933911 AD1-013 C Adder 1.47 MW 1.25 MW
934721 AD1-100 C Adder 15.55 MW 13.22 MW
942991 AE2-321 C Adder 6.51 MW 5.53 MW
943801 AF1-048 C Adder 3.04 MW 2.58 MW
958481 AF2-142 C Adder 9.38 MW 7.97 MW
958491 AF2-143 C Adder 9.01 MW 7.66 MW
959081 AF2-199 C Adder 5.66 MW 4.81 MW
959351 AF2-226 C Adder 1.96 MW 1.66 MW
960281 AF2-319 C Adder 1.96 MW 1.66 MW
960751 AF2-366 C Adder 5.56 MW 4.72 MW
274654 BRAIDWOOD;1U 80/20 19.3 MW 19.3 MW
274655 BRAIDWOOD;2U 80/20 18.85 MW 18.85 MW
274660 LASCO STA;1U 80/20 18.1 MW 18.1 MW
274661 LASCO STA;2U 80/20 18.16 MW 18.16 MW
274675 JOLIET 29;7U 80/20 58.37 MW 58.37 MW
274676 JOLIET 29;8U 80/20 57.3 MW 57.3 MW
274682 WAUKEGAN ;7U Adder 32.93 MW 27.99 MW
274683 WAUKEGAN ;8U Adder 35.5 MW 30.18 MW
274687 WILL CNTY;4U Adder 53.55 MW 45.52 MW
274788 SE CHICAG;5U Adder 3.61 MW 3.07 MW
274789 SE CHICAG;6U Adder 3.61 MW 3.07 MW
274790 SE CHICAG;7U Adder 3.61 MW 3.07 MW
274791 SE CHICAG;8U Adder 3.61 MW 3.07 MW
274792 SE CHICAG;9U Adder 3.69 MW 3.14 MW
274793 SE CHICAG;0U Adder 3.69 MW 3.14 MW
274794 SE CHICAG;1U Adder 3.69 MW 3.14 MW
274795 SE CHICAG;2U Adder 3.69 MW 3.14 MW
274798 UNIV PARK;1U 80/20 0.88 MW 0.88 MW
274799 UNIV PARK;2U 80/20 0.87 MW 0.87 MW
274800 UNIV PARK;3U 80/20 0.87 MW 0.87 MW
274801 UNIV PARK;4U 80/20 0.87 MW 0.87 MW
274802 UNIV PARK;5U 80/20 1.01 MW 1.01 MW
274803 UNIV PARK;6U 80/20 1.01 MW 1.01 MW
274826 FISK ;BP 80/20 1.61 MW 1.61 MW
274827 FISK ;RP 80/20 1.14 MW 1.14 MW
274887 PILOT HIL;1U 80/20 0.57 MW 0.57 MW
274888 KELLY CRK;1U 80/20 0.57 MW 0.57 MW
933411 AC2-154 C 80/20 2.03 MW 2.03 MW
938511 AE1-070 1 Adder 7.38 MW 6.28 MW
938521 AE1-070 2 Adder 6.76 MW 5.74 MW
939061 AE1-134 2 Adder 1.08 MW 0.92 MW
946501 AF1-314 C Adder 3.45 MW 2.93 MW
946661 AF1-330 C Adder 1.59 MW 1.35 MW
957331 AF2-027 C Adder 1.99 MW 1.69 MW
957401 AF2-034 C Adder 1.12 MW 0.95 MW
957471 AF2-041 C Adder 16.98 MW 14.44 MW
958021 AF2-096 C 80/20 19.19 MW 19.19 MW
274674 JOLIET 9 ;6U Adder 29.48 MW 25.06 MW
938851 AE1-113 C Adder 6.34 MW 5.39 MW
934101 AD2-000 1 Adder 4.61 MW 3.92 MW
934111 AD2-000 2 Adder 4.78 MW 4.07 MW
274708 KENDALL ;3C 80/20 2.95 MW 2.95 MW
274709 KENDALL ;3S 80/20 1.95 MW 1.95 MW
274710 KENDALL ;4C 80/20 2.92 MW 2.92 MW
274711 KENDALL ;4S 80/20 1.95 MW 1.95 MW
276678 AD1-016 C Adder 0.74 MW 0.63 MW
276679 AD1-129 C Adder 0.72 MW 0.61 MW
957751 AF2-069 C Adder 0.19 MW 0.16 MW
274805 UNIV PK N;1U 80/20 1.24 MW 1.24 MW
274806 UNIV PK N;2U 80/20 1.23 MW 1.23 MW
274807 UNIV PK N;3U 80/20 1.25 MW 1.25 MW
274808 UNIV PK N;4U 80/20 1.24 MW 1.24 MW
274809 UNIV PK N;5U 80/20 1.23 MW 1.23 MW
274810 UNIV PK N;6U 80/20 1.24 MW 1.24 MW
274811 UNIV PK N;7U 80/20 1.25 MW 1.25 MW
274812 UNIV PK N;8U 80/20 1.24 MW 1.24 MW
274813 UNIV PK N;9U 80/20 1.24 MW 1.24 MW
274814 UNIV PK N;0U 80/20 1.23 MW 1.23 MW
274815 UNIV PK N;XU 80/20 1.24 MW 1.24 MW
274816 UNIV PK N;YU 80/20 1.25 MW 1.25 MW
926821 AC1-168 C Adder 0.9 MW 0.77 MW
934051 AD1-031 C Adder 2.25 MW 1.91 MW
936291 AD2-038 C Adder 2.64 MW 2.25 MW
936371 AD2-047 C 80/20 3.63 MW 3.63 MW
936461 AD2-060 C 80/20 2.14 MW 2.14 MW
936511 AD2-066 C Adder 6.72 MW 5.71 MW
942421 AE2-255 C Adder 2.4 MW 2.04 MW
942651 AE2-281 C Adder 0.7 MW 0.6 MW
943121 AE2-341 C Adder 10.18 MW 8.66 MW
943591 AF1-030 C Adder 6.77 MW 5.76 MW
959091 AF2-200 C Adder 11.32 MW 9.62 MW
959101 AF2-201 C Adder 4.77 MW 4.05 MW
960381 AF2-329 C Adder 4.27 MW 3.63 MW
960591 AF2-350 C 80/20 6.41 MW 6.41 MW
960721 AF2-363 C Adder 4.71 MW 4.0 MW
961011 AF2-392 C Adder 3.14 MW 2.67 MW
961021 AF2-393 C Adder 4.91 MW 4.17 MW
961031 AF2-394 C Adder 3.57 MW 3.04 MW
961501 AF2-441 C Adder 8.0 MW 6.8 MW
961651 AG1-005 C Adder 10.36 MW 8.8 MW
930481 AB1-089 C Adder 52.13 MW 44.31 MW
938861 AE1-114 C Adder 3.12 MW 2.65 MW
939321 AE1-163 C Adder 4.91 MW 4.17 MW
939351 AE1-166 C Adder 8.08 MW 6.87 MW
939401 AE1-172 C Adder 4.23 MW 3.6 MW
946321 AF1-296 C Adder 1.85 MW 1.57 MW
946671 AF1-331 C Adder 1.91 MW 1.62 MW
962691 AG1-118 C Adder 17.64 MW 15.0 MW
962711 AG1-120 C Adder 6.86 MW 5.83 MW
964361 AG1-298 C Adder 51.6 MW 43.86 MW
941551 AE2-152 C Adder 9.33 MW 7.93 MW
957371 AF2-031 C Adder 0.78 MW 0.67 MW
957761 AF2-070 C Adder 0.26 MW 0.23 MW
958011 AF2-095 C 80/20 10.25 MW 10.25 MW
965661 AG1-434 C Adder 3.27 MW 2.78 MW
965671 AG1-435 C Adder 3.0 MW 2.55 MW
945351 AF1-200 FTIR Adder 246.7 MW 209.69 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 67.5 MW 67.5 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.52 MW 11.52 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.85 MW 0.85 MW
WEC LTFEXP_WEC->PJM CLTF 3.11 MW 3.11 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.41 MW 0.41 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.21 MW 0.21 MW
TVA LTFEXP_TVA->PJM CLTF 1.04 MW 1.04 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.47 MW 0.47 MW
MEC LTFEXP_MEC->PJM CLTF 10.3 MW 10.3 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.34 MW 1.34 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.76 MW 2.76 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.6 MW 0.6 MW

Details for GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
AEP/CE GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line
270771 to 243229 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 102.58 971.0 B 996.09 11.32
Addition
Topology Case Flowgate Details for GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.57 MW 4.74 MW
966091 AG1-478 C Adder 1.67 MW 1.42 MW
966431 AG1-512 C 80/20 2.65 MW 2.65 MW
966441 AG1-513 C Adder 0.41 MW 0.35 MW
933911 AD1-013 C Adder 1.47 MW 1.25 MW
934721 AD1-100 C Adder 15.55 MW 13.22 MW
942991 AE2-321 C Adder 6.51 MW 5.53 MW
943801 AF1-048 C Adder 3.04 MW 2.58 MW
958481 AF2-142 C Adder 9.38 MW 7.97 MW
958491 AF2-143 C Adder 9.01 MW 7.66 MW
959081 AF2-199 C Adder 5.66 MW 4.81 MW
959351 AF2-226 C Adder 1.96 MW 1.66 MW
960281 AF2-319 C Adder 1.96 MW 1.66 MW
960751 AF2-366 C Adder 5.56 MW 4.72 MW
274654 BRAIDWOOD;1U 80/20 19.3 MW 19.3 MW
274655 BRAIDWOOD;2U 80/20 18.85 MW 18.85 MW
274660 LASCO STA;1U 80/20 18.1 MW 18.1 MW
274661 LASCO STA;2U 80/20 18.16 MW 18.16 MW
274675 JOLIET 29;7U 80/20 58.37 MW 58.37 MW
274676 JOLIET 29;8U 80/20 57.3 MW 57.3 MW
274682 WAUKEGAN ;7U Adder 32.93 MW 27.99 MW
274683 WAUKEGAN ;8U Adder 35.5 MW 30.18 MW
274687 WILL CNTY;4U Adder 53.55 MW 45.52 MW
274788 SE CHICAG;5U Adder 3.61 MW 3.07 MW
274789 SE CHICAG;6U Adder 3.61 MW 3.07 MW
274790 SE CHICAG;7U Adder 3.61 MW 3.07 MW
274791 SE CHICAG;8U Adder 3.61 MW 3.07 MW
274792 SE CHICAG;9U Adder 3.69 MW 3.14 MW
274793 SE CHICAG;0U Adder 3.69 MW 3.14 MW
274794 SE CHICAG;1U Adder 3.69 MW 3.14 MW
274795 SE CHICAG;2U Adder 3.69 MW 3.14 MW
274798 UNIV PARK;1U 80/20 0.88 MW 0.88 MW
274799 UNIV PARK;2U 80/20 0.87 MW 0.87 MW
274800 UNIV PARK;3U 80/20 0.87 MW 0.87 MW
274801 UNIV PARK;4U 80/20 0.87 MW 0.87 MW
274802 UNIV PARK;5U 80/20 1.01 MW 1.01 MW
274803 UNIV PARK;6U 80/20 1.01 MW 1.01 MW
274826 FISK ;BP 80/20 1.61 MW 1.61 MW
274827 FISK ;RP 80/20 1.14 MW 1.14 MW
274887 PILOT HIL;1U 80/20 0.57 MW 0.57 MW
274888 KELLY CRK;1U 80/20 0.57 MW 0.57 MW
933411 AC2-154 C 80/20 2.03 MW 2.03 MW
938511 AE1-070 1 Adder 7.38 MW 6.28 MW
938521 AE1-070 2 Adder 6.76 MW 5.74 MW
939061 AE1-134 2 Adder 1.08 MW 0.92 MW
946501 AF1-314 C Adder 3.45 MW 2.93 MW
946661 AF1-330 C Adder 1.59 MW 1.35 MW
957331 AF2-027 C Adder 1.99 MW 1.69 MW
957401 AF2-034 C Adder 1.12 MW 0.95 MW
957471 AF2-041 C Adder 16.98 MW 14.44 MW
958021 AF2-096 C 80/20 19.19 MW 19.19 MW
274674 JOLIET 9 ;6U Adder 29.48 MW 25.06 MW
938851 AE1-113 C Adder 6.34 MW 5.39 MW
934101 AD2-000 1 Adder 4.61 MW 3.92 MW
934111 AD2-000 2 Adder 4.78 MW 4.07 MW
274708 KENDALL ;3C 80/20 2.95 MW 2.95 MW
274709 KENDALL ;3S 80/20 1.95 MW 1.95 MW
274710 KENDALL ;4C 80/20 2.92 MW 2.92 MW
274711 KENDALL ;4S 80/20 1.95 MW 1.95 MW
276678 AD1-016 C Adder 0.74 MW 0.63 MW
276679 AD1-129 C Adder 0.72 MW 0.61 MW
957751 AF2-069 C Adder 0.19 MW 0.16 MW
274805 UNIV PK N;1U 80/20 1.24 MW 1.24 MW
274806 UNIV PK N;2U 80/20 1.23 MW 1.23 MW
274807 UNIV PK N;3U 80/20 1.25 MW 1.25 MW
274808 UNIV PK N;4U 80/20 1.24 MW 1.24 MW
274809 UNIV PK N;5U 80/20 1.23 MW 1.23 MW
274810 UNIV PK N;6U 80/20 1.24 MW 1.24 MW
274811 UNIV PK N;7U 80/20 1.25 MW 1.25 MW
274812 UNIV PK N;8U 80/20 1.24 MW 1.24 MW
274813 UNIV PK N;9U 80/20 1.24 MW 1.24 MW
274814 UNIV PK N;0U 80/20 1.23 MW 1.23 MW
274815 UNIV PK N;XU 80/20 1.24 MW 1.24 MW
274816 UNIV PK N;YU 80/20 1.25 MW 1.25 MW
926821 AC1-168 C Adder 0.9 MW 0.77 MW
934051 AD1-031 C Adder 2.25 MW 1.91 MW
936291 AD2-038 C Adder 2.64 MW 2.25 MW
936371 AD2-047 C 80/20 3.63 MW 3.63 MW
936461 AD2-060 C 80/20 2.14 MW 2.14 MW
936511 AD2-066 C Adder 6.72 MW 5.71 MW
942421 AE2-255 C Adder 2.4 MW 2.04 MW
942651 AE2-281 C Adder 0.7 MW 0.6 MW
943121 AE2-341 C Adder 10.18 MW 8.66 MW
943591 AF1-030 C Adder 6.77 MW 5.76 MW
959091 AF2-200 C Adder 11.32 MW 9.62 MW
959101 AF2-201 C Adder 4.77 MW 4.05 MW
960381 AF2-329 C Adder 4.27 MW 3.63 MW
960591 AF2-350 C 80/20 6.41 MW 6.41 MW
960721 AF2-363 C Adder 4.71 MW 4.0 MW
961011 AF2-392 C Adder 3.14 MW 2.67 MW
961021 AF2-393 C Adder 4.91 MW 4.17 MW
961031 AF2-394 C Adder 3.57 MW 3.04 MW
961501 AF2-441 C Adder 8.0 MW 6.8 MW
961651 AG1-005 C Adder 10.36 MW 8.8 MW
930481 AB1-089 C Adder 52.13 MW 44.31 MW
938861 AE1-114 C Adder 3.12 MW 2.65 MW
939321 AE1-163 C Adder 4.91 MW 4.17 MW
939351 AE1-166 C Adder 8.08 MW 6.87 MW
939401 AE1-172 C Adder 4.23 MW 3.6 MW
946321 AF1-296 C Adder 1.85 MW 1.57 MW
946671 AF1-331 C Adder 1.91 MW 1.62 MW
962691 AG1-118 C Adder 17.64 MW 15.0 MW
962711 AG1-120 C Adder 6.86 MW 5.83 MW
964361 AG1-298 C Adder 51.6 MW 43.86 MW
941551 AE2-152 C Adder 9.33 MW 7.93 MW
957371 AF2-031 C Adder 0.78 MW 0.67 MW
957761 AF2-070 C Adder 0.26 MW 0.23 MW
958011 AF2-095 C 80/20 10.25 MW 10.25 MW
965661 AG1-434 C Adder 3.27 MW 2.78 MW
965671 AG1-435 C Adder 3.0 MW 2.55 MW
945351 AF1-200 FTIR Adder 246.7 MW 209.69 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 67.5 MW 67.5 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.52 MW 11.52 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.85 MW 0.85 MW
WEC LTFEXP_WEC->PJM CLTF 3.11 MW 3.11 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.41 MW 0.41 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.21 MW 0.21 MW
TVA LTFEXP_TVA->PJM CLTF 1.04 MW 1.04 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.47 MW 0.47 MW
MEC LTFEXP_MEC->PJM CLTF 10.3 MW 10.3 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.34 MW 1.34 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.76 MW 2.76 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.6 MW 0.6 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Summer Peak Analysis - Eliminated Flowgates
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
CE/NIPS ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line
270886 to 255104 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 101.73 1091.0 B 1109.88 10.36
CE E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 104.48 1483.0 STE 1549.48 14.8
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
Base Case Single AC 116.12 1091.0 A 1266.87 9.66
CE ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line
270731 to 270733 ckt 1
COMED_P4-6_111-345-B______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-B______SRT-A'
 DISCONNECT BUS 270730                                          /*ELECT JCT; B 345.0
 DISCONNECT BUS 275182                                          /*ELECT JCT;1M 138.0
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Breaker AC 100.12 1837.0 STE 1839.27 21.74
CE/NIPS 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line
255112 to 270886 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 101.76 1091.0 B 1110.25 10.36
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 127.0 970.0 STE 1231.93 12.05
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_112-45-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-45-BT4-5___SRT-A'
 TRIP BRANCH FROM BUS 270666 TO BUS 270664 CKT 1   /*BLUE ISL ;BT 345.0 - BLUE ISL ; B 345.0
 TRIP BRANCH FROM BUS 270666 TO BUS 270926 CKT 1   /*BLUE ISL ;BT 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 270770 TO BUS 270666 CKT 1   /*GOODINGS ;4B 345.0 - BLUE ISL ;BT 345.0
 TRIP BRANCH FROM BUS 270852 TO BUS 270704 CKT 1   /*PONTIAC  ; B 345.0 - LORETTO  ; B 345.0
END
Breaker AC 100.34 2297.0 STE 2304.71 20.89
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 128.83 1399.0 B 1802.36 14.61
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 128.83 1399.0 B 1802.33 14.61
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 143.05 971.0 B 1389.01 12.05
CE/NIPS ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line
270886 to 255104 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 101.73 1091.0 B 1109.87 10.36
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
Base Case Single AC 121.06 1075.0 A 1301.35 9.23
CE E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 104.48 1483.0 STE 1549.43 14.8
CE/NIPS 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line
255112 to 270886 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 101.76 1091.0 B 1110.24 10.36
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 127.0 970.0 STE 1231.93 12.05
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 143.05 971.0 B 1389.01 12.05

Details for ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE/NIPS ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line
270886 to 255104 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 101.73 1091.0 B 1109.88 10.36
Elimination
Base Case Details for Eliminated Flowgate ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.09 MW 4.32 MW
966091 AG1-478 C Adder 1.46 MW 1.24 MW
966441 AG1-513 C Adder 0.37 MW 0.32 MW
933911 AD1-013 C Adder 1.34 MW 1.14 MW
934721 AD1-100 C 80/20 14.07 MW 14.07 MW
937401 AD2-194 1 80/20 0.86 MW 0.86 MW
937411 AD2-194 2 80/20 0.86 MW 0.86 MW
942991 AE2-321 C Adder 5.95 MW 5.06 MW
943801 AF1-048 C Adder 2.78 MW 2.36 MW
958481 AF2-142 C Adder 7.82 MW 6.64 MW
958491 AF2-143 C Adder 7.73 MW 6.57 MW
959081 AF2-199 C Adder 5.18 MW 4.4 MW
959351 AF2-226 C 80/20 2.03 MW 2.03 MW
960281 AF2-319 C 80/20 2.03 MW 2.03 MW
960751 AF2-366 C Adder 5.07 MW 4.31 MW
274654 BRAIDWOOD;1U 80/20 17.95 MW 17.95 MW
274655 BRAIDWOOD;2U 80/20 17.47 MW 17.47 MW
274658 DRESDEN ;2U 80/20 13.12 MW 13.12 MW
274660 LASCO STA;1U 80/20 16.67 MW 16.67 MW
274661 LASCO STA;2U 80/20 16.72 MW 16.72 MW
274675 JOLIET 29;7U 80/20 53.77 MW 53.77 MW
274676 JOLIET 29;8U 80/20 52.81 MW 52.81 MW
274682 WAUKEGAN ;7U Adder 30.17 MW 25.64 MW
274683 WAUKEGAN ;8U Adder 32.52 MW 27.64 MW
274687 WILL CNTY;4U 80/20 50.84 MW 50.84 MW
274728 ELWOOD EC;5P 80/20 2.2 MW 2.2 MW
274729 ELWOOD EC;1P 80/20 2.2 MW 2.2 MW
274730 ELWOOD EC;6P 80/20 2.2 MW 2.2 MW
274731 ELWOOD EC;2P 80/20 2.2 MW 2.2 MW
274732 ELWOOD EC;7P 80/20 2.2 MW 2.2 MW
274733 ELWOOD EC;3P 80/20 2.2 MW 2.2 MW
274734 ELWOOD EC;8P 80/20 2.2 MW 2.2 MW
274735 ELWOOD EC;4P 80/20 2.2 MW 2.2 MW
274736 ELWOOD EC;9P 80/20 2.2 MW 2.2 MW
274737 AURORA EC;1P 80/20 2.35 MW 2.35 MW
274739 AURORA EC;2P 80/20 2.35 MW 2.35 MW
274745 AURORA EC;9P 80/20 0.71 MW 0.71 MW
274751 CRETE EC ;1U 80/20 3.3 MW 3.3 MW
274752 CRETE EC ;2U 80/20 3.3 MW 3.3 MW
274753 CRETE EC ;3U 80/20 3.3 MW 3.3 MW
274754 CRETE EC ;4U 80/20 3.3 MW 3.3 MW
274847 GR RIDGE ;BU 80/20 0.39 MW 0.39 MW
274861 TOP CROP ;1U 80/20 0.28 MW 0.28 MW
274862 TOP CROP ;2U 80/20 0.54 MW 0.54 MW
274871 GR RIDGE ;2U 80/20 0.15 MW 0.15 MW
933411 AC2-154 C Adder 1.69 MW 1.43 MW
938511 AE1-070 1 80/20 6.84 MW 6.84 MW
938521 AE1-070 2 80/20 6.25 MW 6.25 MW
946501 AF1-314 C Adder 1.64 MW 1.39 MW
946661 AF1-330 C Adder 1.46 MW 1.24 MW
957331 AF2-027 C Adder 1.82 MW 1.55 MW
957401 AF2-034 C 80/20 1.06 MW 1.06 MW
957471 AF2-041 C Adder 15.54 MW 13.21 MW
958021 AF2-096 C 80/20 19.19 MW 19.19 MW
274674 JOLIET 9 ;6U Adder 25.61 MW 21.77 MW
938851 AE1-113 C Adder 5.87 MW 4.99 MW
934101 AD2-000 1 80/20 4.18 MW 4.18 MW
934111 AD2-000 2 80/20 4.45 MW 4.45 MW
274704 KENDALL ;1C 80/20 2.71 MW 2.71 MW
274705 KENDALL ;1S 80/20 1.81 MW 1.81 MW
274706 KENDALL ;2C 80/20 2.71 MW 2.71 MW
274707 KENDALL ;2S 80/20 1.81 MW 1.81 MW
274708 KENDALL ;3C 80/20 2.6 MW 2.6 MW
274709 KENDALL ;3S 80/20 1.72 MW 1.72 MW
274710 KENDALL ;4C 80/20 2.57 MW 2.57 MW
274711 KENDALL ;4S 80/20 1.72 MW 1.72 MW
276640 AC1-204 GEN1 80/20 8.19 MW 8.19 MW
276642 AC1-204 GEN2 80/20 8.2 MW 8.2 MW
276658 AB1-122 CT1 80/20 7.83 MW 7.83 MW
276660 AB1-122 CT2 80/20 8.33 MW 8.33 MW
276678 AD1-016 C Adder 0.67 MW 0.57 MW
276679 AD1-129 C Adder 0.66 MW 0.56 MW
936291 AD2-038 C Adder 2.27 MW 1.93 MW
936371 AD2-047 C Adder 3.02 MW 2.57 MW
936461 AD2-060 C Adder 1.78 MW 1.51 MW
936511 AD2-066 C Adder 6.06 MW 5.15 MW
942421 AE2-255 C Adder 2.22 MW 1.89 MW
942651 AE2-281 C Adder 0.6 MW 0.51 MW
943121 AE2-341 C Adder 9.26 MW 7.87 MW
943591 AF1-030 C Adder 6.16 MW 5.24 MW
959091 AF2-200 C Adder 10.36 MW 8.81 MW
959101 AF2-201 C Adder 4.36 MW 3.7 MW
960381 AF2-329 C Adder 3.88 MW 3.3 MW
960591 AF2-350 C Adder 5.33 MW 4.53 MW
960721 AF2-363 C Adder 4.3 MW 3.65 MW
930481 AB1-089 C Adder 47.65 MW 40.51 MW
939321 AE1-163 C Adder 4.21 MW 3.58 MW
939351 AE1-166 C 80/20 7.32 MW 7.32 MW
939401 AE1-172 C Adder 3.82 MW 3.25 MW
946671 AF1-331 C Adder 1.74 MW 1.48 MW
962691 AG1-118 C Adder 16.1 MW 13.69 MW
962711 AG1-120 C Adder 6.26 MW 5.33 MW
941551 AE2-152 C 80/20 8.44 MW 8.44 MW
958011 AF2-095 C Adder 8.52 MW 7.25 MW
965661 AG1-434 C Adder 2.99 MW 2.54 MW
945351 AF1-200 FTIR 80/20 191.45 MW 191.45 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.04 MW 59.04 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 9.99 MW 9.99 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.8 MW 0.8 MW
WEC LTFEXP_WEC->PJM CLTF 2.84 MW 2.84 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.39 MW 0.39 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.2 MW 0.2 MW
TVA LTFEXP_TVA->PJM CLTF 0.87 MW 0.87 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.46 MW 0.46 MW
MEC LTFEXP_MEC->PJM CLTF 9.37 MW 9.37 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.34 MW 1.34 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.42 MW 2.42 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.56 MW 0.56 MW

Details for E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 104.48 1483.0 STE 1549.48 14.8
Elimination
Base Case Details for Eliminated Flowgate E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 7.26 MW 6.17 MW
966091 AG1-478 C Adder 2.03 MW 1.73 MW
966441 AG1-513 C Adder 0.53 MW 0.45 MW
933911 AD1-013 C Adder 1.91 MW 1.62 MW
934721 AD1-100 C 80/20 19.89 MW 19.89 MW
937401 AD2-194 1 80/20 1.23 MW 1.23 MW
937411 AD2-194 2 80/20 1.23 MW 1.23 MW
942991 AE2-321 C Adder 8.5 MW 7.22 MW
943801 AF1-048 C Adder 3.97 MW 3.38 MW
958481 AF2-142 C Adder 11.01 MW 9.36 MW
958491 AF2-143 C Adder 10.94 MW 9.3 MW
959081 AF2-199 C Adder 7.4 MW 6.29 MW
959351 AF2-226 C 80/20 2.98 MW 2.98 MW
960281 AF2-319 C 80/20 2.98 MW 2.98 MW
960751 AF2-366 C Adder 7.24 MW 6.15 MW
274654 BRAIDWOOD;1U 80/20 25.98 MW 25.98 MW
274655 BRAIDWOOD;2U 80/20 25.27 MW 25.27 MW
274658 DRESDEN ;2U 80/20 18.82 MW 18.82 MW
274660 LASCO STA;1U 80/20 23.98 MW 23.98 MW
274661 LASCO STA;2U 80/20 24.06 MW 24.06 MW
274675 JOLIET 29;7U 80/20 77.05 MW 77.05 MW
274676 JOLIET 29;8U 80/20 75.69 MW 75.69 MW
274682 WAUKEGAN ;7U Adder 43.11 MW 36.64 MW
274683 WAUKEGAN ;8U Adder 46.47 MW 39.5 MW
274687 WILL CNTY;4U 80/20 72.72 MW 72.72 MW
274728 ELWOOD EC;5P 80/20 3.16 MW 3.16 MW
274729 ELWOOD EC;1P 80/20 3.16 MW 3.16 MW
274730 ELWOOD EC;6P 80/20 3.16 MW 3.16 MW
274731 ELWOOD EC;2P 80/20 3.16 MW 3.16 MW
274732 ELWOOD EC;7P 80/20 3.16 MW 3.16 MW
274733 ELWOOD EC;3P 80/20 3.16 MW 3.16 MW
274734 ELWOOD EC;8P 80/20 3.16 MW 3.16 MW
274735 ELWOOD EC;4P 80/20 3.16 MW 3.16 MW
274736 ELWOOD EC;9P 80/20 3.16 MW 3.16 MW
274737 AURORA EC;1P 80/20 3.35 MW 3.35 MW
274739 AURORA EC;2P 80/20 3.35 MW 3.35 MW
274742 AURORA EC;6P 80/20 1.02 MW 1.02 MW
274743 AURORA EC;7P 80/20 1.02 MW 1.02 MW
274744 AURORA EC;8P 80/20 1.02 MW 1.02 MW
274745 AURORA EC;9P 80/20 1.02 MW 1.02 MW
274746 AURORA EC;0P 80/20 1.02 MW 1.02 MW
274847 GR RIDGE ;BU 80/20 0.56 MW 0.56 MW
274861 TOP CROP ;1U 80/20 0.41 MW 0.41 MW
274862 TOP CROP ;2U 80/20 0.79 MW 0.79 MW
274871 GR RIDGE ;2U 80/20 0.21 MW 0.21 MW
933411 AC2-154 C Adder 2.28 MW 1.94 MW
938511 AE1-070 1 80/20 9.82 MW 9.82 MW
938521 AE1-070 2 80/20 8.97 MW 8.97 MW
946501 AF1-314 C Adder 4.5 MW 3.83 MW
946661 AF1-330 C Adder 2.08 MW 1.77 MW
957331 AF2-027 C Adder 2.6 MW 2.21 MW
957401 AF2-034 C 80/20 1.52 MW 1.52 MW
957471 AF2-041 C Adder 22.2 MW 18.87 MW
958021 AF2-096 C 80/20 28.25 MW 28.25 MW
274674 JOLIET 9 ;6U Adder 35.75 MW 30.39 MW
938851 AE1-113 C Adder 8.42 MW 7.15 MW
934101 AD2-000 1 80/20 5.96 MW 5.96 MW
934111 AD2-000 2 80/20 6.38 MW 6.38 MW
274704 KENDALL ;1C 80/20 3.89 MW 3.89 MW
274705 KENDALL ;1S 80/20 2.6 MW 2.6 MW
274706 KENDALL ;2C 80/20 3.89 MW 3.89 MW
274707 KENDALL ;2S 80/20 2.6 MW 2.6 MW
274708 KENDALL ;3C 80/20 3.69 MW 3.69 MW
274709 KENDALL ;3S 80/20 2.44 MW 2.44 MW
274710 KENDALL ;4C 80/20 3.65 MW 3.65 MW
274711 KENDALL ;4S 80/20 2.44 MW 2.44 MW
276640 AC1-204 GEN1 80/20 11.75 MW 11.75 MW
276642 AC1-204 GEN2 80/20 11.77 MW 11.77 MW
276658 AB1-122 CT1 80/20 11.17 MW 11.17 MW
276660 AB1-122 CT2 80/20 11.95 MW 11.95 MW
276678 AD1-016 C Adder 0.96 MW 0.82 MW
276679 AD1-129 C Adder 0.94 MW 0.8 MW
936291 AD2-038 C Adder 3.21 MW 2.73 MW
936371 AD2-047 C Adder 4.08 MW 3.47 MW
936461 AD2-060 C Adder 2.4 MW 2.04 MW
936511 AD2-066 C Adder 8.62 MW 7.33 MW
942421 AE2-255 C Adder 3.19 MW 2.71 MW
942651 AE2-281 C Adder 0.85 MW 0.72 MW
943121 AE2-341 C Adder 13.2 MW 11.22 MW
943591 AF1-030 C Adder 8.78 MW 7.46 MW
959091 AF2-200 C Adder 14.8 MW 12.58 MW
959101 AF2-201 C Adder 6.22 MW 5.29 MW
960381 AF2-329 C Adder 5.54 MW 4.71 MW
960591 AF2-350 C Adder 7.2 MW 6.12 MW
960721 AF2-363 C Adder 6.14 MW 5.22 MW
930481 AB1-089 C Adder 68.06 MW 57.85 MW
938861 AE1-114 C Adder 0.63 MW 0.54 MW
939321 AE1-163 C Adder 5.96 MW 5.06 MW
939351 AE1-166 C 80/20 10.34 MW 10.34 MW
939401 AE1-172 C Adder 5.41 MW 4.6 MW
946671 AF1-331 C Adder 2.48 MW 2.11 MW
962691 AG1-118 C Adder 22.97 MW 19.53 MW
962711 AG1-120 C Adder 8.94 MW 7.6 MW
941551 AE2-152 C 80/20 11.94 MW 11.94 MW
958011 AF2-095 C Adder 11.52 MW 9.79 MW
965661 AG1-434 C Adder 4.28 MW 3.64 MW
945351 AF1-200 FTIR 80/20 273.12 MW 273.12 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 82.85 MW 82.85 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 14.43 MW 14.43 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.06 MW 1.06 MW
WEC LTFEXP_WEC->PJM CLTF 4.06 MW 4.06 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.49 MW 0.49 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.25 MW 0.25 MW
TVA LTFEXP_TVA->PJM CLTF 1.32 MW 1.32 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.62 MW 0.62 MW
MEC LTFEXP_MEC->PJM CLTF 13.4 MW 13.4 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.8 MW 1.8 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.55 MW 3.55 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.72 MW 0.72 MW

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
Base Case Single AC 116.12 1091.0 A 1266.87 9.66
Elimination
Base Case Details for Eliminated Flowgate CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
274837 EQUISTAR ; B 80/20 1.03 MW 1.03 MW
274836 EQUISTAR ; R 80/20 1.51 MW 1.51 MW
962781 AG1-127 C Adder 4.7 MW 3.99 MW
966091 AG1-478 C Adder 1.35 MW 1.15 MW
966441 AG1-513 C Adder 0.34 MW 0.29 MW
933911 AD1-013 C Adder 1.24 MW 1.05 MW
934721 AD1-100 C Adder 12.97 MW 11.03 MW
937401 AD2-194 1 80/20 0.84 MW 0.84 MW
937411 AD2-194 2 80/20 0.84 MW 0.84 MW
942991 AE2-321 C Adder 5.57 MW 4.73 MW
943801 AF1-048 C Adder 2.6 MW 2.21 MW
958481 AF2-142 C Adder 7.35 MW 6.25 MW
958491 AF2-143 C Adder 7.34 MW 6.24 MW
959081 AF2-199 C Adder 4.83 MW 4.1 MW
959351 AF2-226 C 80/20 2.17 MW 2.17 MW
960281 AF2-319 C 80/20 2.17 MW 2.17 MW
960751 AF2-366 C Adder 4.68 MW 3.98 MW
274654 BRAIDWOOD;1U 80/20 17.93 MW 17.93 MW
274655 BRAIDWOOD;2U 80/20 17.43 MW 17.43 MW
274658 DRESDEN ;2U 80/20 12.83 MW 12.83 MW
274660 LASCO STA;1U 80/20 15.76 MW 15.76 MW
274661 LASCO STA;2U 80/20 15.81 MW 15.81 MW
274675 JOLIET 29;7U 80/20 52.85 MW 52.85 MW
274676 JOLIET 29;8U 80/20 51.94 MW 51.94 MW
274682 WAUKEGAN ;7U 80/20 28.62 MW 28.62 MW
274683 WAUKEGAN ;8U Adder 30.84 MW 26.21 MW
274687 WILL CNTY;4U 80/20 50.78 MW 50.78 MW
274728 ELWOOD EC;5P 80/20 2.17 MW 2.17 MW
274729 ELWOOD EC;1P 80/20 2.16 MW 2.16 MW
274730 ELWOOD EC;6P 80/20 2.17 MW 2.17 MW
274731 ELWOOD EC;2P 80/20 2.16 MW 2.16 MW
274732 ELWOOD EC;7P 80/20 2.17 MW 2.17 MW
274733 ELWOOD EC;3P 80/20 2.16 MW 2.16 MW
274734 ELWOOD EC;8P 80/20 2.17 MW 2.17 MW
274735 ELWOOD EC;4P 80/20 2.16 MW 2.16 MW
274736 ELWOOD EC;9P 80/20 2.17 MW 2.17 MW
274751 CRETE EC ;1U 80/20 5.36 MW 5.36 MW
274752 CRETE EC ;2U 80/20 5.36 MW 5.36 MW
274753 CRETE EC ;3U 80/20 5.36 MW 5.36 MW
274754 CRETE EC ;4U 80/20 5.36 MW 5.36 MW
274847 GR RIDGE ;BU 80/20 0.37 MW 0.37 MW
274861 TOP CROP ;1U 80/20 0.3 MW 0.3 MW
274862 TOP CROP ;2U 80/20 0.58 MW 0.58 MW
274871 GR RIDGE ;2U 80/20 0.14 MW 0.14 MW
933411 AC2-154 C Adder 1.47 MW 1.25 MW
938511 AE1-070 1 80/20 6.72 MW 6.72 MW
938521 AE1-070 2 80/20 6.13 MW 6.13 MW
946501 AF1-314 C Adder 2.95 MW 2.51 MW
946661 AF1-330 C Adder 1.36 MW 1.16 MW
957331 AF2-027 C Adder 1.73 MW 1.47 MW
957401 AF2-034 C 80/20 1.05 MW 1.05 MW
957471 AF2-041 C Adder 14.48 MW 12.31 MW
958021 AF2-096 C 80/20 20.27 MW 20.27 MW
274674 JOLIET 9 ;6U Adder 23.38 MW 19.88 MW
938851 AE1-113 C Adder 5.72 MW 4.86 MW
934101 AD2-000 1 80/20 3.84 MW 3.84 MW
934111 AD2-000 2 80/20 4.35 MW 4.35 MW
274704 KENDALL ;1C 80/20 2.69 MW 2.69 MW
274705 KENDALL ;1S 80/20 1.8 MW 1.8 MW
274706 KENDALL ;2C 80/20 2.69 MW 2.69 MW
274707 KENDALL ;2S 80/20 1.8 MW 1.8 MW
276640 AC1-204 GEN1 80/20 8.04 MW 8.04 MW
276642 AC1-204 GEN2 80/20 8.06 MW 8.06 MW
276658 AB1-122 CT1 80/20 7.2 MW 7.2 MW
276660 AB1-122 CT2 80/20 8.15 MW 8.15 MW
276678 AD1-016 C Adder 0.63 MW 0.54 MW
276679 AD1-129 C Adder 0.61 MW 0.52 MW
926821 AC1-168 C Adder 0.6 MW 0.51 MW
936291 AD2-038 C Adder 2.15 MW 1.83 MW
936371 AD2-047 C Adder 2.63 MW 2.23 MW
936461 AD2-060 C Adder 1.54 MW 1.31 MW
936511 AD2-066 C Adder 5.74 MW 4.88 MW
942421 AE2-255 C Adder 2.17 MW 1.84 MW
942651 AE2-281 C Adder 0.57 MW 0.48 MW
943121 AE2-341 C Adder 8.39 MW 7.13 MW
943591 AF1-030 C Adder 5.58 MW 4.75 MW
959091 AF2-200 C Adder 9.66 MW 8.21 MW
959101 AF2-201 C Adder 4.07 MW 3.46 MW
960381 AF2-329 C Adder 3.52 MW 2.99 MW
960591 AF2-350 C Adder 4.63 MW 3.94 MW
960721 AF2-363 C Adder 3.99 MW 3.39 MW
961011 AF2-392 C Adder 2.68 MW 2.28 MW
961021 AF2-393 C Adder 4.19 MW 3.56 MW
961031 AF2-394 C Adder 3.05 MW 2.59 MW
930481 AB1-089 C Adder 44.51 MW 37.84 MW
938861 AE1-114 C Adder 2.66 MW 2.26 MW
939321 AE1-163 C Adder 4.0 MW 3.4 MW
939351 AE1-166 C Adder 6.75 MW 5.73 MW
939401 AE1-172 C Adder 3.51 MW 2.98 MW
946671 AF1-331 C Adder 1.61 MW 1.37 MW
962691 AG1-118 C Adder 14.86 MW 12.63 MW
962711 AG1-120 C Adder 5.81 MW 4.94 MW
941551 AE2-152 C Adder 7.78 MW 6.62 MW
958011 AF2-095 C Adder 7.41 MW 6.3 MW
965661 AG1-434 C Adder 2.79 MW 2.37 MW
945351 AF1-200 FTIR Adder 193.34 MW 164.34 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 49.72 MW 49.72 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 8.33 MW 8.33 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.78 MW 0.78 MW
WEC LTFEXP_WEC->PJM CLTF 2.69 MW 2.69 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.4 MW 0.4 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.21 MW 0.21 MW
TVA LTFEXP_TVA->PJM CLTF 0.66 MW 0.66 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.51 MW 0.51 MW
MEC LTFEXP_MEC->PJM CLTF 8.72 MW 8.72 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.5 MW 1.5 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.08 MW 2.08 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.57 MW 0.57 MW

Details for ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line l/o COMED_P4-6_111-345-B______SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line
270731 to 270733 ckt 1
COMED_P4-6_111-345-B______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-B______SRT-A'
 DISCONNECT BUS 270730                                          /*ELECT JCT; B 345.0
 DISCONNECT BUS 275182                                          /*ELECT JCT;1M 138.0
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Breaker AC 100.12 1837.0 STE 1839.27 21.74
Elimination
Base Case Details for Eliminated Flowgate ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line l/o COMED_P4-6_111-345-B______SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.79 MW 1.52 MW
962012 AG1-044 E Adder 0.06 MW 0.05 MW
962781 AG1-127 C Adder 4.25 MW 3.61 MW
962782 AG1-127 E Adder 2.83 MW 2.4 MW
966441 AG1-513 C Adder 0.33 MW 0.28 MW
966442 AG1-513 E Adder 0.5 MW 0.42 MW
290051 GSG-6; E Adder 7.16 MW 6.09 MW
295109 WESTBROOK E Adder 3.84 MW 3.26 MW
295111 SUBLETTE E Adder 1.86 MW 1.58 MW
933911 AD1-013 C Adder 1.25 MW 1.06 MW
933912 AD1-013 E Adder 1.99 MW 1.7 MW
933932 AD1-016 E Adder 1.98 MW 1.68 MW
934972 AD1-129 E Adder 0.75 MW 0.64 MW
937002 AD2-134 E Adder 6.93 MW 5.89 MW
937312 AD2-172 E Adder 3.79 MW 3.22 MW
942991 AE2-321 C Adder 10.65 MW 9.05 MW
942992 AE2-321 E Adder 5.24 MW 4.46 MW
943801 AF1-048 C Adder 4.98 MW 4.23 MW
943802 AF1-048 E Adder 3.32 MW 2.82 MW
958912 AF2-182 E Adder 36.36 MW 30.9 MW
959081 AF2-199 C Adder 6.52 MW 5.54 MW
959082 AF2-199 E Adder 3.26 MW 2.77 MW
960582 AF2-349 E Adder 46.52 MW 39.54 MW
960751 AF2-366 C Adder 4.23 MW 3.6 MW
960752 AF2-366 E Adder 2.82 MW 2.4 MW
274682 WAUKEGAN ;7U Adder 19.55 MW 16.61 MW
274683 WAUKEGAN ;8U Adder 20.82 MW 17.69 MW
274693 ROCKY RD ;1P 50/50 3.03 MW 3.03 MW
274695 ROCKY RD ;2P 50/50 3.06 MW 3.06 MW
274696 ROCKY RD ;4P 50/50 3.12 MW 3.12 MW
274697 ROCKY RD ;3P 50/50 0.83 MW 0.83 MW
274737 AURORA EC;1P 50/50 13.19 MW 13.19 MW
274739 AURORA EC;2P 50/50 13.19 MW 13.19 MW
274818 ELGIN EC ;1P 50/50 3.83 MW 3.83 MW
274819 ELGIN EC ;3P 50/50 3.89 MW 3.89 MW
274820 ELGIN EC ;2P 50/50 3.83 MW 3.83 MW
274821 ELGIN EC ;4P 50/50 3.92 MW 3.92 MW
274859 EASYR;U1 E Adder 13.27 MW 11.28 MW
274860 EASYR;U2 E Adder 13.27 MW 11.28 MW
276591 L-013 2 Adder 4.39 MW 3.73 MW
293715 O-029 E Adder 7.97 MW 6.77 MW
293716 O-029 E Adder 4.37 MW 3.71 MW
293717 O-029 E Adder 4.01 MW 3.41 MW
294763 P-046 E Adder 10.54 MW 8.96 MW
939061 AE1-134 2 Adder 1.33 MW 1.13 MW
940502 AE2-035 E Adder 3.79 MW 3.22 MW
946501 AF1-314 C Adder 4.86 MW 4.13 MW
946502 AF1-314 E Adder 22.85 MW 19.43 MW
946661 AF1-330 C Adder 2.62 MW 2.23 MW
946662 AF1-330 E Adder 0.58 MW 0.49 MW
957331 AF2-027 C Adder 1.25 MW 1.06 MW
957332 AF2-027 E Adder 1.87 MW 1.59 MW
957471 AF2-041 C Adder 19.56 MW 16.63 MW
957472 AF2-041 E Adder 9.78 MW 8.31 MW
934101 AD2-000 1 Adder 4.25 MW 3.61 MW
276678 AD1-016 C Adder 1.21 MW 1.03 MW
276679 AD1-129 C Adder 1.13 MW 0.96 MW
293516 O-009 E Adder 15.4 MW 13.09 MW
290108 LEEDK;1U E Adder 14.49 MW 12.31 MW
916221 Z1-073 E Adder 5.05 MW 4.29 MW
959091 AF2-200 C Adder 13.04 MW 11.09 MW
959092 AF2-200 E Adder 8.69 MW 7.39 MW
959101 AF2-201 C Adder 6.72 MW 5.71 MW
959102 AF2-201 E Adder 19.3 MW 16.4 MW
960721 AF2-363 C Adder 4.97 MW 4.22 MW
960722 AF2-363 E Adder 3.31 MW 2.82 MW
961011 AF2-392 C Adder 3.71 MW 3.15 MW
961012 AF2-392 E Adder 17.25 MW 14.66 MW
961021 AF2-393 C Adder 5.79 MW 4.92 MW
961031 AF2-394 C Adder 4.21 MW 3.58 MW
966822 AG1-553 E Adder 25.68 MW 21.83 MW
930481 AB1-089 C 50/50 96.01 MW 96.01 MW
930482 AB1-089 E 50/50 4.36 MW 4.36 MW
938861 AE1-114 C Adder 4.09 MW 3.48 MW
938862 AE1-114 E Adder 13.95 MW 11.86 MW
946152 AF1-280 E Adder 24.24 MW 20.6 MW
946321 AF1-296 C Adder 3.42 MW 2.91 MW
946322 AF1-296 E Adder 16.0 MW 13.6 MW
946671 AF1-331 C Adder 1.62 MW 1.38 MW
962691 AG1-118 C Adder 12.86 MW 10.94 MW
962692 AG1-118 E Adder 8.58 MW 7.29 MW
962711 AG1-120 C Adder 7.24 MW 6.15 MW
962712 AG1-120 E Adder 4.83 MW 4.1 MW
965661 AG1-434 C Adder 3.83 MW 3.25 MW
965662 AG1-434 E Adder 15.21 MW 12.93 MW
965931 AG1-462 C Adder 13.83 MW 11.76 MW
965932 AG1-462 E Adder 9.22 MW 7.84 MW
961022 AF2-393 E Adder 0.53 MW 0.45 MW
945352 AF1-200 NFTW 50/50 382.98 MW 382.98 MW
276170 Z1-108 E Adder 3.92 MW 3.33 MW
920272 AA2-123 E Adder 3.76 MW 3.2 MW
276626 AG1-044 E Adder 0.07 MW 0.06 MW
955972 J1084 External Queue 8.82 MW 8.82 MW
990117 J1214 G External Queue 23.96 MW 23.96 MW
990407 J1304 G External Queue 5.61 MW 5.61 MW
990512 J1326 G External Queue 6.0 MW 6.0 MW
990727 J1377 G External Queue 9.14 MW 9.14 MW
990947 J1432 C External Queue 2.22 MW 2.22 MW
990948 J1432 E External Queue 12.03 MW 12.03 MW
991392 J1884 External Queue 13.37 MW 13.37 MW
991667 J2272 External Queue 12.66 MW 12.66 MW
991687 J2304 G External Queue 29.34 MW 29.34 MW
991777 J1629 G External Queue 11.51 MW 11.51 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 67.18 MW 67.18 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 8.56 MW 8.56 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.79 MW 0.79 MW
NY PJM->LTFIMP_NY CLTF 0.42 MW 0.42 MW
WEC LTFEXP_WEC->PJM CLTF 2.42 MW 2.42 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.12 MW 0.12 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.05 MW 0.05 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.24 MW 0.24 MW
MEC LTFEXP_MEC->PJM CLTF 9.77 MW 9.77 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.67 MW 0.67 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.5 MW 2.5 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 5.04 MW 5.04 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.2 MW 0.2 MW

Details for 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE/NIPS 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line
255112 to 270886 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 101.76 1091.0 B 1110.25 10.36
Elimination
Base Case Details for Eliminated Flowgate 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.09 MW 4.32 MW
966091 AG1-478 C Adder 1.46 MW 1.24 MW
966441 AG1-513 C Adder 0.37 MW 0.32 MW
933911 AD1-013 C Adder 1.34 MW 1.14 MW
934721 AD1-100 C 80/20 14.07 MW 14.07 MW
937401 AD2-194 1 80/20 0.86 MW 0.86 MW
937411 AD2-194 2 80/20 0.86 MW 0.86 MW
942991 AE2-321 C Adder 5.95 MW 5.06 MW
943801 AF1-048 C Adder 2.78 MW 2.36 MW
958481 AF2-142 C Adder 7.82 MW 6.64 MW
958491 AF2-143 C Adder 7.73 MW 6.57 MW
959081 AF2-199 C Adder 5.18 MW 4.4 MW
959351 AF2-226 C 80/20 2.03 MW 2.03 MW
960281 AF2-319 C 80/20 2.03 MW 2.03 MW
960751 AF2-366 C Adder 5.07 MW 4.31 MW
274654 BRAIDWOOD;1U 80/20 17.95 MW 17.95 MW
274655 BRAIDWOOD;2U 80/20 17.47 MW 17.47 MW
274658 DRESDEN ;2U 80/20 13.12 MW 13.12 MW
274660 LASCO STA;1U 80/20 16.67 MW 16.67 MW
274661 LASCO STA;2U 80/20 16.72 MW 16.72 MW
274675 JOLIET 29;7U 80/20 53.77 MW 53.77 MW
274676 JOLIET 29;8U 80/20 52.81 MW 52.81 MW
274682 WAUKEGAN ;7U Adder 30.17 MW 25.64 MW
274683 WAUKEGAN ;8U Adder 32.52 MW 27.64 MW
274687 WILL CNTY;4U 80/20 50.84 MW 50.84 MW
274728 ELWOOD EC;5P 80/20 2.2 MW 2.2 MW
274729 ELWOOD EC;1P 80/20 2.2 MW 2.2 MW
274730 ELWOOD EC;6P 80/20 2.2 MW 2.2 MW
274731 ELWOOD EC;2P 80/20 2.2 MW 2.2 MW
274732 ELWOOD EC;7P 80/20 2.2 MW 2.2 MW
274733 ELWOOD EC;3P 80/20 2.2 MW 2.2 MW
274734 ELWOOD EC;8P 80/20 2.2 MW 2.2 MW
274735 ELWOOD EC;4P 80/20 2.2 MW 2.2 MW
274736 ELWOOD EC;9P 80/20 2.2 MW 2.2 MW
274737 AURORA EC;1P 80/20 2.35 MW 2.35 MW
274739 AURORA EC;2P 80/20 2.35 MW 2.35 MW
274745 AURORA EC;9P 80/20 0.71 MW 0.71 MW
274751 CRETE EC ;1U 80/20 3.3 MW 3.3 MW
274752 CRETE EC ;2U 80/20 3.3 MW 3.3 MW
274753 CRETE EC ;3U 80/20 3.3 MW 3.3 MW
274754 CRETE EC ;4U 80/20 3.3 MW 3.3 MW
274847 GR RIDGE ;BU 80/20 0.39 MW 0.39 MW
274861 TOP CROP ;1U 80/20 0.28 MW 0.28 MW
274862 TOP CROP ;2U 80/20 0.54 MW 0.54 MW
274871 GR RIDGE ;2U 80/20 0.15 MW 0.15 MW
933411 AC2-154 C Adder 1.69 MW 1.43 MW
938511 AE1-070 1 80/20 6.84 MW 6.84 MW
938521 AE1-070 2 80/20 6.25 MW 6.25 MW
946501 AF1-314 C Adder 1.64 MW 1.39 MW
946661 AF1-330 C Adder 1.46 MW 1.24 MW
957331 AF2-027 C Adder 1.82 MW 1.55 MW
957401 AF2-034 C 80/20 1.06 MW 1.06 MW
957471 AF2-041 C Adder 15.54 MW 13.21 MW
958021 AF2-096 C 80/20 19.19 MW 19.19 MW
274674 JOLIET 9 ;6U Adder 25.61 MW 21.77 MW
938851 AE1-113 C Adder 5.87 MW 4.99 MW
934101 AD2-000 1 80/20 4.18 MW 4.18 MW
934111 AD2-000 2 80/20 4.45 MW 4.45 MW
274704 KENDALL ;1C 80/20 2.71 MW 2.71 MW
274705 KENDALL ;1S 80/20 1.81 MW 1.81 MW
274706 KENDALL ;2C 80/20 2.71 MW 2.71 MW
274707 KENDALL ;2S 80/20 1.81 MW 1.81 MW
274708 KENDALL ;3C 80/20 2.6 MW 2.6 MW
274709 KENDALL ;3S 80/20 1.72 MW 1.72 MW
274710 KENDALL ;4C 80/20 2.57 MW 2.57 MW
274711 KENDALL ;4S 80/20 1.72 MW 1.72 MW
276640 AC1-204 GEN1 80/20 8.19 MW 8.19 MW
276642 AC1-204 GEN2 80/20 8.2 MW 8.2 MW
276658 AB1-122 CT1 80/20 7.83 MW 7.83 MW
276660 AB1-122 CT2 80/20 8.33 MW 8.33 MW
276678 AD1-016 C Adder 0.67 MW 0.57 MW
276679 AD1-129 C Adder 0.66 MW 0.56 MW
936291 AD2-038 C Adder 2.27 MW 1.93 MW
936371 AD2-047 C Adder 3.02 MW 2.57 MW
936461 AD2-060 C Adder 1.78 MW 1.51 MW
936511 AD2-066 C Adder 6.06 MW 5.15 MW
942421 AE2-255 C Adder 2.22 MW 1.89 MW
942651 AE2-281 C Adder 0.6 MW 0.51 MW
943121 AE2-341 C Adder 9.26 MW 7.87 MW
943591 AF1-030 C Adder 6.16 MW 5.24 MW
959091 AF2-200 C Adder 10.36 MW 8.81 MW
959101 AF2-201 C Adder 4.36 MW 3.7 MW
960381 AF2-329 C Adder 3.88 MW 3.3 MW
960591 AF2-350 C Adder 5.33 MW 4.53 MW
960721 AF2-363 C Adder 4.3 MW 3.65 MW
930481 AB1-089 C Adder 47.65 MW 40.51 MW
939321 AE1-163 C Adder 4.21 MW 3.58 MW
939351 AE1-166 C 80/20 7.32 MW 7.32 MW
939401 AE1-172 C Adder 3.82 MW 3.25 MW
946671 AF1-331 C Adder 1.74 MW 1.48 MW
962691 AG1-118 C Adder 16.1 MW 13.69 MW
962711 AG1-120 C Adder 6.26 MW 5.33 MW
941551 AE2-152 C 80/20 8.44 MW 8.44 MW
958011 AF2-095 C Adder 8.52 MW 7.25 MW
965661 AG1-434 C Adder 2.99 MW 2.54 MW
945351 AF1-200 FTIR 80/20 191.45 MW 191.45 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.04 MW 59.04 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 9.99 MW 9.99 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.8 MW 0.8 MW
WEC LTFEXP_WEC->PJM CLTF 2.84 MW 2.84 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.39 MW 0.39 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.2 MW 0.2 MW
TVA LTFEXP_TVA->PJM CLTF 0.87 MW 0.87 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.46 MW 0.46 MW
MEC LTFEXP_MEC->PJM CLTF 9.37 MW 9.37 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.34 MW 1.34 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.42 MW 2.42 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.56 MW 0.56 MW

Details for UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 127.0 970.0 STE 1231.93 12.05
Elimination
Base Case Details for Eliminated Flowgate UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.94 MW 5.05 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966431 AG1-512 C 80/20 3.81 MW 3.81 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
934721 AD1-100 C Adder 16.45 MW 13.98 MW
942991 AE2-321 C Adder 6.93 MW 5.89 MW
943801 AF1-048 C Adder 3.24 MW 2.75 MW
958481 AF2-142 C 80/20 10.28 MW 10.28 MW
958491 AF2-143 C Adder 9.8 MW 8.33 MW
959081 AF2-199 C Adder 6.02 MW 5.12 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
274654 BRAIDWOOD;1U 80/20 20.71 MW 20.71 MW
274655 BRAIDWOOD;2U 80/20 20.25 MW 20.25 MW
274660 LASCO STA;1U 80/20 19.36 MW 19.36 MW
274661 LASCO STA;2U 80/20 19.42 MW 19.42 MW
274675 JOLIET 29;7U 80/20 62.31 MW 62.31 MW
274676 JOLIET 29;8U 80/20 61.15 MW 61.15 MW
274682 WAUKEGAN ;7U Adder 35.09 MW 29.82 MW
274683 WAUKEGAN ;8U Adder 37.83 MW 32.15 MW
274687 WILL CNTY;4U Adder 56.07 MW 47.66 MW
274735 ELWOOD EC;4P 80/20 2.54 MW 2.54 MW
274798 UNIV PARK;1U 80/20 0.92 MW 0.92 MW
274799 UNIV PARK;2U 80/20 0.91 MW 0.91 MW
274800 UNIV PARK;3U 80/20 0.91 MW 0.91 MW
274801 UNIV PARK;4U 80/20 0.91 MW 0.91 MW
274802 UNIV PARK;5U 80/20 1.19 MW 1.19 MW
274803 UNIV PARK;6U 80/20 1.19 MW 1.19 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
938511 AE1-070 1 Adder 7.88 MW 6.69 MW
938521 AE1-070 2 Adder 7.21 MW 6.13 MW
939061 AE1-134 2 Adder 1.15 MW 0.98 MW
946501 AF1-314 C Adder 3.67 MW 3.12 MW
946661 AF1-330 C Adder 1.7 MW 1.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957401 AF2-034 C Adder 1.18 MW 1.01 MW
957471 AF2-041 C Adder 18.07 MW 15.36 MW
958021 AF2-096 C 80/20 20.44 MW 20.44 MW
274674 JOLIET 9 ;6U Adder 31.29 MW 26.6 MW
938851 AE1-113 C Adder 6.74 MW 5.73 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.32 MW
270839 OTTER CRK; R 80/20 0.34 MW 0.34 MW
274708 KENDALL ;3C 80/20 3.17 MW 3.17 MW
274709 KENDALL ;3S 80/20 2.1 MW 2.1 MW
274710 KENDALL ;4C 80/20 3.13 MW 3.13 MW
274711 KENDALL ;4S 80/20 2.1 MW 2.1 MW
276640 AC1-204 GEN1 80/20 9.45 MW 9.45 MW
276642 AC1-204 GEN2 80/20 9.44 MW 9.44 MW
276678 AD1-016 C Adder 0.79 MW 0.67 MW
276679 AD1-129 C Adder 0.76 MW 0.65 MW
957751 AF2-069 C Adder 0.2 MW 0.17 MW
274805 UNIV PK N;1U 80/20 1.78 MW 1.78 MW
274806 UNIV PK N;2U 80/20 1.76 MW 1.76 MW
274807 UNIV PK N;3U 80/20 1.79 MW 1.79 MW
274808 UNIV PK N;4U 80/20 1.78 MW 1.78 MW
274809 UNIV PK N;5U 80/20 1.76 MW 1.76 MW
274810 UNIV PK N;6U 80/20 1.78 MW 1.78 MW
274811 UNIV PK N;7U 80/20 1.79 MW 1.79 MW
274812 UNIV PK N;8U 80/20 1.78 MW 1.78 MW
274813 UNIV PK N;9U 80/20 1.78 MW 1.78 MW
274814 UNIV PK N;0U 80/20 1.77 MW 1.77 MW
274815 UNIV PK N;XU 80/20 1.78 MW 1.78 MW
274816 UNIV PK N;YU 80/20 1.79 MW 1.79 MW
926821 AC1-168 C Adder 0.96 MW 0.82 MW
934051 AD1-031 C Adder 2.4 MW 2.04 MW
936291 AD2-038 C Adder 2.88 MW 2.44 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959101 AF2-201 C Adder 5.08 MW 4.31 MW
960381 AF2-329 C Adder 4.55 MW 3.87 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960721 AF2-363 C Adder 5.02 MW 4.26 MW
961011 AF2-392 C Adder 3.34 MW 2.84 MW
961021 AF2-393 C Adder 5.22 MW 4.44 MW
961031 AF2-394 C Adder 3.8 MW 3.23 MW
961501 AF2-441 C Adder 7.21 MW 6.13 MW
961651 AG1-005 C Adder 11.02 MW 9.37 MW
930481 AB1-089 C Adder 55.5 MW 47.18 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
946321 AF1-296 C Adder 3.32 MW 2.83 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962711 AG1-120 C Adder 7.31 MW 6.21 MW
964361 AG1-298 C Adder 45.31 MW 38.51 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
957761 AF2-070 C Adder 0.28 MW 0.24 MW
958011 AF2-095 C Adder 10.72 MW 9.11 MW
965661 AG1-434 C Adder 3.48 MW 2.96 MW
965671 AG1-435 C Adder 3.2 MW 2.72 MW
965931 AG1-462 C Adder 5.85 MW 4.97 MW
945351 AF1-200 FTIR Adder 262.82 MW 223.39 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.47 MW 69.47 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.78 MW 11.78 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.53 MW 1.53 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.84 MW 2.84 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_112-45-BT4-5___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_112-45-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-45-BT4-5___SRT-A'
 TRIP BRANCH FROM BUS 270666 TO BUS 270664 CKT 1   /*BLUE ISL ;BT 345.0 - BLUE ISL ; B 345.0
 TRIP BRANCH FROM BUS 270666 TO BUS 270926 CKT 1   /*BLUE ISL ;BT 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 270770 TO BUS 270666 CKT 1   /*GOODINGS ;4B 345.0 - BLUE ISL ;BT 345.0
 TRIP BRANCH FROM BUS 270852 TO BUS 270704 CKT 1   /*PONTIAC  ; B 345.0 - LORETTO  ; B 345.0
END
Breaker AC 100.34 2297.0 STE 2304.71 20.89
Elimination
Base Case Details for Eliminated Flowgate GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_112-45-BT4-5___SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.15 MW 1.83 MW
962012 AG1-044 E Adder 0.06 MW 0.05 MW
962781 AG1-127 C Adder 5.52 MW 4.69 MW
962782 AG1-127 E Adder 3.67 MW 3.12 MW
966441 AG1-513 C Adder 0.4 MW 0.34 MW
966442 AG1-513 E Adder 0.59 MW 0.5 MW
290021 O50 E Adder 26.13 MW 22.21 MW
290051 GSG-6; E Adder 8.56 MW 7.28 MW
295109 WESTBROOK E Adder 4.58 MW 3.9 MW
295111 SUBLETTE E Adder 2.23 MW 1.9 MW
933911 AD1-013 C Adder 1.5 MW 1.28 MW
933912 AD1-013 E Adder 2.4 MW 2.04 MW
933932 AD1-016 E Adder 1.33 MW 1.13 MW
934972 AD1-129 E Adder 0.53 MW 0.45 MW
937002 AD2-134 E Adder 8.28 MW 7.04 MW
937312 AD2-172 E Adder 3.01 MW 2.56 MW
937401 AD2-194 1 50/50 1.68 MW 1.68 MW
937411 AD2-194 2 50/50 1.7 MW 1.7 MW
942991 AE2-321 C Adder 7.2 MW 6.12 MW
942992 AE2-321 E Adder 3.54 MW 3.01 MW
943801 AF1-048 C Adder 3.36 MW 2.86 MW
943802 AF1-048 E Adder 2.24 MW 1.91 MW
958491 AF2-143 C Adder 8.43 MW 7.17 MW
958492 AF2-143 E Adder 5.62 MW 4.78 MW
958912 AF2-182 E Adder 30.75 MW 26.14 MW
959081 AF2-199 C Adder 6.27 MW 5.33 MW
959082 AF2-199 E Adder 3.13 MW 2.66 MW
959351 AF2-226 C 50/50 7.13 MW 7.13 MW
959352 AF2-226 E 50/50 10.7 MW 10.7 MW
960281 AF2-319 C 50/50 7.13 MW 7.13 MW
960282 AF2-319 E 50/50 10.7 MW 10.7 MW
960582 AF2-349 E Adder 32.1 MW 27.28 MW
960751 AF2-366 C Adder 5.5 MW 4.67 MW
960752 AF2-366 E Adder 3.67 MW 3.12 MW
274675 JOLIET 29;7U Adder 90.97 MW 77.33 MW
274676 JOLIET 29;8U Adder 89.79 MW 76.32 MW
274682 WAUKEGAN ;7U Adder 38.81 MW 32.99 MW
274683 WAUKEGAN ;8U Adder 41.76 MW 35.49 MW
274728 ELWOOD EC;5P 50/50 4.37 MW 4.37 MW
274729 ELWOOD EC;1P 50/50 4.32 MW 4.32 MW
274730 ELWOOD EC;6P 50/50 4.37 MW 4.37 MW
274731 ELWOOD EC;2P 50/50 4.32 MW 4.32 MW
274732 ELWOOD EC;7P 50/50 4.37 MW 4.37 MW
274734 ELWOOD EC;8P 50/50 4.37 MW 4.37 MW
274735 ELWOOD EC;4P 50/50 4.32 MW 4.32 MW
274736 ELWOOD EC;9P 50/50 4.37 MW 4.37 MW
274859 EASYR;U1 E Adder 10.78 MW 9.16 MW
274860 EASYR;U2 E Adder 10.78 MW 9.16 MW
274861 TOP CROP ;1U 50/50 0.99 MW 0.99 MW
274862 TOP CROP ;2U 50/50 1.9 MW 1.9 MW
276591 L-013 2 Adder 3.0 MW 2.55 MW
293644 O22 E1 50/50 40.98 MW 40.98 MW
293645 O22 E2 50/50 46.94 MW 46.94 MW
293715 O-029 E Adder 8.86 MW 7.54 MW
293716 O-029 E Adder 4.86 MW 4.13 MW
293717 O-029 E Adder 4.47 MW 3.8 MW
293771 O-035 E Adder 6.17 MW 5.25 MW
294401 BSHIL;1U E Adder 8.03 MW 6.82 MW
294410 BSHIL;2U E Adder 8.03 MW 6.82 MW
294763 P-046 E Adder 8.37 MW 7.12 MW
925582 AC1-033 E Adder 8.8 MW 7.48 MW
938511 AE1-070 1 50/50 13.57 MW 13.57 MW
938521 AE1-070 2 50/50 12.26 MW 12.26 MW
939061 AE1-134 2 Adder 1.24 MW 1.05 MW
940502 AE2-035 E Adder 3.01 MW 2.56 MW
946501 AF1-314 C Adder 3.86 MW 3.29 MW
946502 AF1-314 E Adder 18.16 MW 15.44 MW
946661 AF1-330 C Adder 1.76 MW 1.5 MW
946662 AF1-330 E Adder 0.39 MW 0.33 MW
957331 AF2-027 C Adder 2.33 MW 1.98 MW
957332 AF2-027 E Adder 3.5 MW 2.97 MW
957401 AF2-034 C 50/50 2.15 MW 2.15 MW
957402 AF2-034 E 50/50 1.83 MW 1.83 MW
957471 AF2-041 C Adder 18.8 MW 15.98 MW
957472 AF2-041 E Adder 9.4 MW 7.99 MW
938851 AE1-113 C Adder 10.78 MW 9.16 MW
938852 AE1-113 E Adder 38.21 MW 32.48 MW
934101 AD2-000 1 Adder 5.81 MW 4.94 MW
934111 AD2-000 2 Adder 8.16 MW 6.94 MW
274704 KENDALL ;1C 50/50 5.51 MW 5.51 MW
274705 KENDALL ;1S 50/50 3.68 MW 3.68 MW
274706 KENDALL ;2C 50/50 5.51 MW 5.51 MW
274707 KENDALL ;2S 50/50 3.68 MW 3.68 MW
276640 AC1-204 GEN1 50/50 16.07 MW 16.07 MW
276642 AC1-204 GEN2 50/50 16.27 MW 16.27 MW
276678 AD1-016 C Adder 0.82 MW 0.69 MW
276679 AD1-129 C Adder 0.8 MW 0.68 MW
293516 O-009 E Adder 17.14 MW 14.57 MW
916212 CRESCENT ;1U Adder 4.34 MW 3.69 MW
927208 AC1-214 E1 Adder 2.93 MW 2.49 MW
927209 AC1-214 E2 Adder 2.93 MW 2.49 MW
957751 AF2-069 C Adder 0.21 MW 0.18 MW
957752 AF2-069 E Adder 0.69 MW 0.58 MW
990901 L-005 E Adder 12.28 MW 10.43 MW
290108 LEEDK;1U E Adder 19.06 MW 16.2 MW
916221 Z1-073 E Adder 6.04 MW 5.13 MW
934051 AD1-031 C Adder 2.68 MW 2.28 MW
934052 AD1-031 E Adder 4.37 MW 3.72 MW
936291 AD2-038 C Adder 1.27 MW 1.08 MW
936292 AD2-038 E Adder 11.58 MW 9.84 MW
936511 AD2-066 C Adder 7.33 MW 6.23 MW
936512 AD2-066 E Adder 4.89 MW 4.16 MW
942421 AE2-255 C Adder 4.08 MW 3.47 MW
942422 AE2-255 E Adder 12.25 MW 10.41 MW
942652 AE2-281 E Adder 4.03 MW 3.42 MW
959091 AF2-200 C Adder 12.54 MW 10.66 MW
959092 AF2-200 E Adder 8.36 MW 7.1 MW
959101 AF2-201 C Adder 5.34 MW 4.54 MW
959102 AF2-201 E Adder 15.34 MW 13.04 MW
960721 AF2-363 C Adder 4.88 MW 4.15 MW
960722 AF2-363 E Adder 3.25 MW 2.76 MW
961011 AF2-392 C Adder 3.57 MW 3.03 MW
961012 AF2-392 E Adder 16.6 MW 14.11 MW
961021 AF2-393 C Adder 5.58 MW 4.74 MW
961031 AF2-394 C Adder 4.05 MW 3.45 MW
966822 AG1-553 E Adder 28.01 MW 23.8 MW
930481 AB1-089 C Adder 57.77 MW 49.1 MW
930482 AB1-089 E Adder 2.63 MW 2.23 MW
938861 AE1-114 C Adder 3.5 MW 2.97 MW
938862 AE1-114 E Adder 11.93 MW 10.14 MW
939321 AE1-163 C Adder 4.59 MW 3.9 MW
939322 AE1-163 E Adder 28.2 MW 23.97 MW
946152 AF1-280 E Adder 20.5 MW 17.42 MW
946321 AF1-296 C Adder 3.68 MW 3.13 MW
946322 AF1-296 E Adder 17.25 MW 14.67 MW
946671 AF1-331 C Adder 1.95 MW 1.66 MW
962691 AG1-118 C Adder 17.38 MW 14.77 MW
962692 AG1-118 E Adder 11.59 MW 9.85 MW
962711 AG1-120 C Adder 7.11 MW 6.04 MW
962712 AG1-120 E Adder 4.74 MW 4.03 MW
957761 AF2-070 C Adder 0.3 MW 0.26 MW
957762 AF2-070 E Adder 1.46 MW 1.24 MW
965661 AG1-434 C Adder 3.65 MW 3.1 MW
965662 AG1-434 E Adder 14.51 MW 12.33 MW
965671 AG1-435 C Adder 3.42 MW 2.91 MW
965672 AG1-435 E Adder 11.17 MW 9.49 MW
965931 AG1-462 C Adder 15.09 MW 12.82 MW
965932 AG1-462 E Adder 10.06 MW 8.55 MW
961022 AF2-393 E Adder 0.51 MW 0.43 MW
276170 Z1-108 E Adder 2.58 MW 2.19 MW
920272 AA2-123 E Adder 2.53 MW 2.15 MW
276626 AG1-044 E Adder 0.07 MW 0.06 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 76.28 MW 76.28 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 15.89 MW 15.89 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.31 MW 1.31 MW
NY PJM->LTFIMP_NY CLTF 0.71 MW 0.71 MW
WEC LTFEXP_WEC->PJM CLTF 3.64 MW 3.64 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.18 MW 0.18 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.07 MW 0.07 MW
TVA LTFEXP_TVA->PJM CLTF 1.82 MW 1.82 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.31 MW 0.31 MW
MEC LTFEXP_MEC->PJM CLTF 12.67 MW 12.67 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.86 MW 0.86 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.97 MW 3.97 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.04 MW 0.04 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 8.4 MW 8.4 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.31 MW 0.31 MW

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 128.83 1399.0 B 1802.36 14.61
Elimination
Base Case Details for Eliminated Flowgate CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 7.16 MW 6.09 MW
966091 AG1-478 C Adder 2.01 MW 1.71 MW
966441 AG1-513 C Adder 0.52 MW 0.44 MW
933911 AD1-013 C Adder 1.88 MW 1.6 MW
934721 AD1-100 C 80/20 19.65 MW 19.65 MW
937401 AD2-194 1 80/20 1.21 MW 1.21 MW
937411 AD2-194 2 80/20 1.22 MW 1.22 MW
942991 AE2-321 C Adder 8.39 MW 7.13 MW
943801 AF1-048 C Adder 3.92 MW 3.33 MW
958481 AF2-142 C Adder 10.86 MW 9.23 MW
958491 AF2-143 C Adder 10.8 MW 9.18 MW
959081 AF2-199 C Adder 7.31 MW 6.21 MW
959351 AF2-226 C 80/20 2.95 MW 2.95 MW
960281 AF2-319 C 80/20 2.95 MW 2.95 MW
960751 AF2-366 C Adder 7.14 MW 6.07 MW
274654 BRAIDWOOD;1U 80/20 25.69 MW 25.69 MW
274655 BRAIDWOOD;2U 80/20 24.99 MW 24.99 MW
274658 DRESDEN ;2U 80/20 18.6 MW 18.6 MW
274660 LASCO STA;1U 80/20 23.71 MW 23.71 MW
274661 LASCO STA;2U 80/20 23.78 MW 23.78 MW
274675 JOLIET 29;7U 80/20 76.17 MW 76.17 MW
274676 JOLIET 29;8U 80/20 74.83 MW 74.83 MW
274682 WAUKEGAN ;7U Adder 42.59 MW 36.2 MW
274683 WAUKEGAN ;8U Adder 45.9 MW 39.02 MW
274687 WILL CNTY;4U 80/20 71.91 MW 71.91 MW
274728 ELWOOD EC;5P 80/20 3.13 MW 3.13 MW
274729 ELWOOD EC;1P 80/20 3.12 MW 3.12 MW
274730 ELWOOD EC;6P 80/20 3.13 MW 3.13 MW
274731 ELWOOD EC;2P 80/20 3.12 MW 3.12 MW
274732 ELWOOD EC;7P 80/20 3.13 MW 3.13 MW
274733 ELWOOD EC;3P 80/20 3.12 MW 3.12 MW
274734 ELWOOD EC;8P 80/20 3.13 MW 3.13 MW
274735 ELWOOD EC;4P 80/20 3.12 MW 3.12 MW
274736 ELWOOD EC;9P 80/20 3.13 MW 3.13 MW
274737 AURORA EC;1P 80/20 3.31 MW 3.31 MW
274739 AURORA EC;2P 80/20 3.31 MW 3.31 MW
274742 AURORA EC;6P 80/20 1.01 MW 1.01 MW
274751 CRETE EC ;1U 80/20 5.68 MW 5.68 MW
274752 CRETE EC ;2U 80/20 5.68 MW 5.68 MW
274753 CRETE EC ;3U 80/20 5.68 MW 5.68 MW
274754 CRETE EC ;4U 80/20 5.68 MW 5.68 MW
274847 GR RIDGE ;BU 80/20 0.56 MW 0.56 MW
274861 TOP CROP ;1U 80/20 0.41 MW 0.41 MW
274862 TOP CROP ;2U 80/20 0.78 MW 0.78 MW
274871 GR RIDGE ;2U 80/20 0.21 MW 0.21 MW
933411 AC2-154 C Adder 2.25 MW 1.91 MW
938511 AE1-070 1 80/20 9.71 MW 9.71 MW
938521 AE1-070 2 80/20 8.87 MW 8.87 MW
946501 AF1-314 C Adder 4.45 MW 3.78 MW
946661 AF1-330 C Adder 2.05 MW 1.75 MW
957331 AF2-027 C Adder 2.57 MW 2.19 MW
957401 AF2-034 C 80/20 1.51 MW 1.51 MW
957471 AF2-041 C Adder 21.92 MW 18.63 MW
958021 AF2-096 C 80/20 27.96 MW 27.96 MW
274674 JOLIET 9 ;6U Adder 35.3 MW 30.01 MW
938851 AE1-113 C Adder 8.31 MW 7.07 MW
934101 AD2-000 1 80/20 5.89 MW 5.89 MW
934111 AD2-000 2 80/20 6.31 MW 6.31 MW
274704 KENDALL ;1C 80/20 3.85 MW 3.85 MW
274705 KENDALL ;1S 80/20 2.58 MW 2.58 MW
274706 KENDALL ;2C 80/20 3.85 MW 3.85 MW
274707 KENDALL ;2S 80/20 2.58 MW 2.58 MW
274708 KENDALL ;3C 80/20 3.65 MW 3.65 MW
274709 KENDALL ;3S 80/20 2.41 MW 2.41 MW
274710 KENDALL ;4C 80/20 3.61 MW 3.61 MW
274711 KENDALL ;4S 80/20 2.41 MW 2.41 MW
276640 AC1-204 GEN1 80/20 11.61 MW 11.61 MW
276642 AC1-204 GEN2 80/20 11.63 MW 11.63 MW
276658 AB1-122 CT1 80/20 11.03 MW 11.03 MW
276660 AB1-122 CT2 80/20 11.81 MW 11.81 MW
276678 AD1-016 C Adder 0.95 MW 0.81 MW
276679 AD1-129 C Adder 0.92 MW 0.79 MW
936291 AD2-038 C Adder 3.17 MW 2.69 MW
936371 AD2-047 C Adder 4.03 MW 3.42 MW
936461 AD2-060 C Adder 2.37 MW 2.01 MW
936511 AD2-066 C Adder 8.51 MW 7.24 MW
942421 AE2-255 C Adder 3.15 MW 2.68 MW
942651 AE2-281 C Adder 0.84 MW 0.71 MW
943121 AE2-341 C Adder 13.04 MW 11.08 MW
943591 AF1-030 C Adder 8.67 MW 7.37 MW
959091 AF2-200 C Adder 14.61 MW 12.42 MW
959101 AF2-201 C Adder 6.14 MW 5.22 MW
960381 AF2-329 C Adder 5.47 MW 4.65 MW
960591 AF2-350 C Adder 4.99 MW 4.24 MW
960721 AF2-363 C Adder 6.06 MW 5.15 MW
930481 AB1-089 C Adder 67.19 MW 57.11 MW
939321 AE1-163 C Adder 5.88 MW 5.0 MW
939351 AE1-166 C 80/20 10.22 MW 10.22 MW
939401 AE1-172 C Adder 5.34 MW 4.54 MW
946671 AF1-331 C Adder 2.45 MW 2.08 MW
962691 AG1-118 C Adder 22.69 MW 19.28 MW
962711 AG1-120 C Adder 8.83 MW 7.5 MW
941551 AE2-152 C 80/20 11.79 MW 11.79 MW
958011 AF2-095 C Adder 11.37 MW 9.66 MW
965661 AG1-434 C Adder 4.22 MW 3.59 MW
945351 AF1-200 FTIR 80/20 269.88 MW 269.88 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 80.16 MW 80.16 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 13.38 MW 13.38 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.15 MW 1.15 MW
WEC LTFEXP_WEC->PJM CLTF 4.01 MW 4.01 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.58 MW 0.58 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.1 MW 1.1 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.71 MW 0.71 MW
MEC LTFEXP_MEC->PJM CLTF 13.15 MW 13.15 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.08 MW 2.08 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.27 MW 3.27 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.84 MW 0.84 MW

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 128.83 1399.0 B 1802.33 14.61
Elimination
Base Case Details for Eliminated Flowgate CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 7.16 MW 6.09 MW
966091 AG1-478 C Adder 2.01 MW 1.71 MW
966441 AG1-513 C Adder 0.52 MW 0.44 MW
933911 AD1-013 C Adder 1.88 MW 1.6 MW
934721 AD1-100 C 80/20 19.65 MW 19.65 MW
937401 AD2-194 1 80/20 1.21 MW 1.21 MW
937411 AD2-194 2 80/20 1.22 MW 1.22 MW
942991 AE2-321 C Adder 8.39 MW 7.13 MW
943801 AF1-048 C Adder 3.92 MW 3.33 MW
958481 AF2-142 C Adder 10.86 MW 9.23 MW
958491 AF2-143 C Adder 10.8 MW 9.18 MW
959081 AF2-199 C Adder 7.31 MW 6.21 MW
959351 AF2-226 C 80/20 2.95 MW 2.95 MW
960281 AF2-319 C 80/20 2.95 MW 2.95 MW
960751 AF2-366 C Adder 7.14 MW 6.07 MW
274654 BRAIDWOOD;1U 80/20 25.69 MW 25.69 MW
274655 BRAIDWOOD;2U 80/20 24.99 MW 24.99 MW
274658 DRESDEN ;2U 80/20 18.6 MW 18.6 MW
274660 LASCO STA;1U 80/20 23.71 MW 23.71 MW
274661 LASCO STA;2U 80/20 23.78 MW 23.78 MW
274675 JOLIET 29;7U 80/20 76.17 MW 76.17 MW
274676 JOLIET 29;8U 80/20 74.83 MW 74.83 MW
274682 WAUKEGAN ;7U Adder 42.59 MW 36.2 MW
274683 WAUKEGAN ;8U Adder 45.9 MW 39.02 MW
274687 WILL CNTY;4U 80/20 71.91 MW 71.91 MW
274728 ELWOOD EC;5P 80/20 3.13 MW 3.13 MW
274729 ELWOOD EC;1P 80/20 3.12 MW 3.12 MW
274730 ELWOOD EC;6P 80/20 3.13 MW 3.13 MW
274731 ELWOOD EC;2P 80/20 3.12 MW 3.12 MW
274732 ELWOOD EC;7P 80/20 3.13 MW 3.13 MW
274733 ELWOOD EC;3P 80/20 3.12 MW 3.12 MW
274734 ELWOOD EC;8P 80/20 3.13 MW 3.13 MW
274735 ELWOOD EC;4P 80/20 3.12 MW 3.12 MW
274736 ELWOOD EC;9P 80/20 3.13 MW 3.13 MW
274737 AURORA EC;1P 80/20 3.31 MW 3.31 MW
274739 AURORA EC;2P 80/20 3.31 MW 3.31 MW
274742 AURORA EC;6P 80/20 1.01 MW 1.01 MW
274751 CRETE EC ;1U 80/20 5.68 MW 5.68 MW
274752 CRETE EC ;2U 80/20 5.68 MW 5.68 MW
274753 CRETE EC ;3U 80/20 5.68 MW 5.68 MW
274754 CRETE EC ;4U 80/20 5.68 MW 5.68 MW
274847 GR RIDGE ;BU 80/20 0.56 MW 0.56 MW
274861 TOP CROP ;1U 80/20 0.41 MW 0.41 MW
274862 TOP CROP ;2U 80/20 0.78 MW 0.78 MW
274871 GR RIDGE ;2U 80/20 0.21 MW 0.21 MW
933411 AC2-154 C Adder 2.25 MW 1.91 MW
938511 AE1-070 1 80/20 9.71 MW 9.71 MW
938521 AE1-070 2 80/20 8.87 MW 8.87 MW
946501 AF1-314 C Adder 4.45 MW 3.78 MW
946661 AF1-330 C Adder 2.05 MW 1.75 MW
957331 AF2-027 C Adder 2.57 MW 2.19 MW
957401 AF2-034 C 80/20 1.51 MW 1.51 MW
957471 AF2-041 C Adder 21.92 MW 18.63 MW
958021 AF2-096 C 80/20 27.96 MW 27.96 MW
274674 JOLIET 9 ;6U Adder 35.3 MW 30.01 MW
938851 AE1-113 C Adder 8.31 MW 7.07 MW
934101 AD2-000 1 80/20 5.89 MW 5.89 MW
934111 AD2-000 2 80/20 6.31 MW 6.31 MW
274704 KENDALL ;1C 80/20 3.85 MW 3.85 MW
274705 KENDALL ;1S 80/20 2.58 MW 2.58 MW
274706 KENDALL ;2C 80/20 3.85 MW 3.85 MW
274707 KENDALL ;2S 80/20 2.58 MW 2.58 MW
274708 KENDALL ;3C 80/20 3.65 MW 3.65 MW
274709 KENDALL ;3S 80/20 2.41 MW 2.41 MW
274710 KENDALL ;4C 80/20 3.61 MW 3.61 MW
274711 KENDALL ;4S 80/20 2.41 MW 2.41 MW
276640 AC1-204 GEN1 80/20 11.61 MW 11.61 MW
276642 AC1-204 GEN2 80/20 11.63 MW 11.63 MW
276658 AB1-122 CT1 80/20 11.03 MW 11.03 MW
276660 AB1-122 CT2 80/20 11.81 MW 11.81 MW
276678 AD1-016 C Adder 0.95 MW 0.81 MW
276679 AD1-129 C Adder 0.92 MW 0.79 MW
936291 AD2-038 C Adder 3.17 MW 2.69 MW
936371 AD2-047 C Adder 4.03 MW 3.42 MW
936461 AD2-060 C Adder 2.37 MW 2.01 MW
936511 AD2-066 C Adder 8.51 MW 7.24 MW
942421 AE2-255 C Adder 3.15 MW 2.68 MW
942651 AE2-281 C Adder 0.84 MW 0.71 MW
943121 AE2-341 C Adder 13.04 MW 11.08 MW
943591 AF1-030 C Adder 8.67 MW 7.37 MW
959091 AF2-200 C Adder 14.61 MW 12.42 MW
959101 AF2-201 C Adder 6.14 MW 5.22 MW
960381 AF2-329 C Adder 5.47 MW 4.65 MW
960591 AF2-350 C Adder 4.99 MW 4.24 MW
960721 AF2-363 C Adder 6.06 MW 5.15 MW
930481 AB1-089 C Adder 67.19 MW 57.11 MW
939321 AE1-163 C Adder 5.88 MW 5.0 MW
939351 AE1-166 C 80/20 10.22 MW 10.22 MW
939401 AE1-172 C Adder 5.34 MW 4.54 MW
946671 AF1-331 C Adder 2.45 MW 2.08 MW
962691 AG1-118 C Adder 22.69 MW 19.28 MW
962711 AG1-120 C Adder 8.83 MW 7.5 MW
941551 AE2-152 C 80/20 11.79 MW 11.79 MW
958011 AF2-095 C Adder 11.37 MW 9.66 MW
965661 AG1-434 C Adder 4.22 MW 3.59 MW
945351 AF1-200 FTIR 80/20 269.88 MW 269.88 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 80.16 MW 80.16 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 13.38 MW 13.38 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.15 MW 1.15 MW
WEC LTFEXP_WEC->PJM CLTF 4.01 MW 4.01 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.58 MW 0.58 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.1 MW 1.1 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.71 MW 0.71 MW
MEC LTFEXP_MEC->PJM CLTF 13.15 MW 13.15 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.08 MW 2.08 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.27 MW 3.27 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.84 MW 0.84 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 143.05 971.0 B 1389.01 12.05
Elimination
Base Case Details for Eliminated Flowgate AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.94 MW 5.05 MW
965681 AG1-436 C 80/20 63.95 MW 63.95 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966431 AG1-512 C 80/20 3.81 MW 3.81 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
934721 AD1-100 C Adder 16.45 MW 13.98 MW
942991 AE2-321 C Adder 6.93 MW 5.89 MW
943801 AF1-048 C Adder 3.24 MW 2.75 MW
958481 AF2-142 C 80/20 10.28 MW 10.28 MW
958491 AF2-143 C Adder 9.8 MW 8.33 MW
959081 AF2-199 C Adder 6.02 MW 5.12 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960681 AF2-359 C 80/20 63.95 MW 63.95 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
274654 BRAIDWOOD;1U 80/20 20.71 MW 20.71 MW
274655 BRAIDWOOD;2U 80/20 20.25 MW 20.25 MW
274660 LASCO STA;1U 80/20 19.36 MW 19.36 MW
274661 LASCO STA;2U 80/20 19.42 MW 19.42 MW
274675 JOLIET 29;7U 80/20 62.31 MW 62.31 MW
274676 JOLIET 29;8U 80/20 61.15 MW 61.15 MW
274682 WAUKEGAN ;7U Adder 35.09 MW 29.82 MW
274683 WAUKEGAN ;8U Adder 37.83 MW 32.15 MW
274687 WILL CNTY;4U Adder 56.07 MW 47.66 MW
274798 UNIV PARK;1U 80/20 0.92 MW 0.92 MW
274799 UNIV PARK;2U 80/20 0.91 MW 0.91 MW
274800 UNIV PARK;3U 80/20 0.91 MW 0.91 MW
274801 UNIV PARK;4U 80/20 0.91 MW 0.91 MW
274802 UNIV PARK;5U 80/20 1.19 MW 1.19 MW
274803 UNIV PARK;6U 80/20 1.19 MW 1.19 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
938511 AE1-070 1 Adder 7.88 MW 6.69 MW
938521 AE1-070 2 Adder 7.21 MW 6.13 MW
939061 AE1-134 2 Adder 1.15 MW 0.98 MW
946501 AF1-314 C Adder 3.67 MW 3.12 MW
946661 AF1-330 C Adder 1.7 MW 1.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957401 AF2-034 C Adder 1.18 MW 1.01 MW
957471 AF2-041 C Adder 18.07 MW 15.36 MW
958021 AF2-096 C 80/20 20.44 MW 20.44 MW
274674 JOLIET 9 ;6U Adder 31.29 MW 26.6 MW
938851 AE1-113 C Adder 6.74 MW 5.73 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.32 MW
270839 OTTER CRK; R 80/20 0.34 MW 0.34 MW
274708 KENDALL ;3C 80/20 3.17 MW 3.17 MW
274709 KENDALL ;3S 80/20 2.1 MW 2.1 MW
274710 KENDALL ;4C 80/20 3.13 MW 3.13 MW
274711 KENDALL ;4S 80/20 2.1 MW 2.1 MW
276640 AC1-204 GEN1 80/20 9.45 MW 9.45 MW
276642 AC1-204 GEN2 80/20 9.44 MW 9.44 MW
276678 AD1-016 C Adder 0.79 MW 0.67 MW
276679 AD1-129 C Adder 0.76 MW 0.65 MW
957751 AF2-069 C Adder 0.2 MW 0.17 MW
274805 UNIV PK N;1U 80/20 1.78 MW 1.78 MW
274806 UNIV PK N;2U 80/20 1.76 MW 1.76 MW
274807 UNIV PK N;3U 80/20 1.79 MW 1.79 MW
274808 UNIV PK N;4U 80/20 1.78 MW 1.78 MW
274809 UNIV PK N;5U 80/20 1.76 MW 1.76 MW
274810 UNIV PK N;6U 80/20 1.78 MW 1.78 MW
274811 UNIV PK N;7U 80/20 1.79 MW 1.79 MW
274812 UNIV PK N;8U 80/20 1.78 MW 1.78 MW
274813 UNIV PK N;9U 80/20 1.78 MW 1.78 MW
274814 UNIV PK N;0U 80/20 1.77 MW 1.77 MW
274815 UNIV PK N;XU 80/20 1.78 MW 1.78 MW
274816 UNIV PK N;YU 80/20 1.79 MW 1.79 MW
926821 AC1-168 C Adder 0.96 MW 0.82 MW
936291 AD2-038 C Adder 2.88 MW 2.44 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959101 AF2-201 C Adder 5.08 MW 4.31 MW
960381 AF2-329 C Adder 4.55 MW 3.87 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960721 AF2-363 C Adder 5.02 MW 4.26 MW
961011 AF2-392 C Adder 3.34 MW 2.84 MW
961021 AF2-393 C Adder 5.22 MW 4.44 MW
961031 AF2-394 C Adder 3.8 MW 3.23 MW
961501 AF2-441 C Adder 0.46 MW 0.39 MW
961651 AG1-005 C Adder 11.02 MW 9.37 MW
930481 AB1-089 C Adder 55.5 MW 47.18 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962711 AG1-120 C Adder 7.31 MW 6.21 MW
964361 AG1-298 C Adder 45.31 MW 38.51 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
957761 AF2-070 C Adder 0.28 MW 0.24 MW
958011 AF2-095 C Adder 10.72 MW 9.11 MW
965661 AG1-434 C Adder 3.48 MW 2.96 MW
965671 AG1-435 C Adder 3.2 MW 2.72 MW
965791 AG1-447 C 80/20 46.9 MW 46.9 MW
945351 AF1-200 FTIR Adder 262.82 MW 223.39 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.47 MW 69.47 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.78 MW 11.78 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.53 MW 1.53 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.84 MW 2.84 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE/NIPS ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line
270886 to 255104 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 101.73 1091.0 B 1109.87 10.36
Elimination
Base Case Details for Eliminated Flowgate ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.09 MW 4.32 MW
966091 AG1-478 C Adder 1.46 MW 1.24 MW
966441 AG1-513 C Adder 0.37 MW 0.32 MW
933911 AD1-013 C Adder 1.34 MW 1.14 MW
934721 AD1-100 C 80/20 14.07 MW 14.07 MW
937401 AD2-194 1 80/20 0.86 MW 0.86 MW
937411 AD2-194 2 80/20 0.86 MW 0.86 MW
942991 AE2-321 C Adder 5.95 MW 5.06 MW
943801 AF1-048 C Adder 2.78 MW 2.36 MW
958481 AF2-142 C Adder 7.82 MW 6.64 MW
958491 AF2-143 C Adder 7.73 MW 6.57 MW
959081 AF2-199 C Adder 5.18 MW 4.4 MW
959351 AF2-226 C 80/20 2.03 MW 2.03 MW
960281 AF2-319 C 80/20 2.03 MW 2.03 MW
960751 AF2-366 C Adder 5.07 MW 4.31 MW
274654 BRAIDWOOD;1U 80/20 17.95 MW 17.95 MW
274655 BRAIDWOOD;2U 80/20 17.47 MW 17.47 MW
274658 DRESDEN ;2U 80/20 13.12 MW 13.12 MW
274660 LASCO STA;1U 80/20 16.67 MW 16.67 MW
274661 LASCO STA;2U 80/20 16.72 MW 16.72 MW
274675 JOLIET 29;7U 80/20 53.77 MW 53.77 MW
274676 JOLIET 29;8U 80/20 52.81 MW 52.81 MW
274682 WAUKEGAN ;7U Adder 30.17 MW 25.64 MW
274683 WAUKEGAN ;8U Adder 32.52 MW 27.64 MW
274687 WILL CNTY;4U 80/20 50.84 MW 50.84 MW
274728 ELWOOD EC;5P 80/20 2.2 MW 2.2 MW
274729 ELWOOD EC;1P 80/20 2.2 MW 2.2 MW
274730 ELWOOD EC;6P 80/20 2.2 MW 2.2 MW
274731 ELWOOD EC;2P 80/20 2.2 MW 2.2 MW
274732 ELWOOD EC;7P 80/20 2.2 MW 2.2 MW
274733 ELWOOD EC;3P 80/20 2.2 MW 2.2 MW
274734 ELWOOD EC;8P 80/20 2.2 MW 2.2 MW
274735 ELWOOD EC;4P 80/20 2.2 MW 2.2 MW
274736 ELWOOD EC;9P 80/20 2.2 MW 2.2 MW
274737 AURORA EC;1P 80/20 2.35 MW 2.35 MW
274739 AURORA EC;2P 80/20 2.35 MW 2.35 MW
274745 AURORA EC;9P 80/20 0.71 MW 0.71 MW
274751 CRETE EC ;1U 80/20 3.3 MW 3.3 MW
274752 CRETE EC ;2U 80/20 3.3 MW 3.3 MW
274753 CRETE EC ;3U 80/20 3.3 MW 3.3 MW
274754 CRETE EC ;4U 80/20 3.3 MW 3.3 MW
274847 GR RIDGE ;BU 80/20 0.39 MW 0.39 MW
274861 TOP CROP ;1U 80/20 0.28 MW 0.28 MW
274862 TOP CROP ;2U 80/20 0.54 MW 0.54 MW
274871 GR RIDGE ;2U 80/20 0.15 MW 0.15 MW
933411 AC2-154 C Adder 1.69 MW 1.43 MW
938511 AE1-070 1 80/20 6.84 MW 6.84 MW
938521 AE1-070 2 80/20 6.25 MW 6.25 MW
946501 AF1-314 C Adder 1.64 MW 1.39 MW
946661 AF1-330 C Adder 1.46 MW 1.24 MW
957331 AF2-027 C Adder 1.82 MW 1.55 MW
957401 AF2-034 C 80/20 1.06 MW 1.06 MW
957471 AF2-041 C Adder 15.54 MW 13.21 MW
958021 AF2-096 C 80/20 19.19 MW 19.19 MW
274674 JOLIET 9 ;6U Adder 25.61 MW 21.77 MW
938851 AE1-113 C Adder 5.87 MW 4.99 MW
934101 AD2-000 1 80/20 4.18 MW 4.18 MW
934111 AD2-000 2 80/20 4.45 MW 4.45 MW
274704 KENDALL ;1C 80/20 2.71 MW 2.71 MW
274705 KENDALL ;1S 80/20 1.81 MW 1.81 MW
274706 KENDALL ;2C 80/20 2.71 MW 2.71 MW
274707 KENDALL ;2S 80/20 1.81 MW 1.81 MW
274708 KENDALL ;3C 80/20 2.6 MW 2.6 MW
274709 KENDALL ;3S 80/20 1.72 MW 1.72 MW
274710 KENDALL ;4C 80/20 2.57 MW 2.57 MW
274711 KENDALL ;4S 80/20 1.72 MW 1.72 MW
276640 AC1-204 GEN1 80/20 8.19 MW 8.19 MW
276642 AC1-204 GEN2 80/20 8.2 MW 8.2 MW
276658 AB1-122 CT1 80/20 7.83 MW 7.83 MW
276660 AB1-122 CT2 80/20 8.33 MW 8.33 MW
276678 AD1-016 C Adder 0.67 MW 0.57 MW
276679 AD1-129 C Adder 0.66 MW 0.56 MW
936291 AD2-038 C Adder 2.27 MW 1.93 MW
936371 AD2-047 C Adder 3.02 MW 2.57 MW
936461 AD2-060 C Adder 1.78 MW 1.51 MW
936511 AD2-066 C Adder 6.06 MW 5.15 MW
942421 AE2-255 C Adder 2.22 MW 1.89 MW
942651 AE2-281 C Adder 0.6 MW 0.51 MW
943121 AE2-341 C Adder 9.26 MW 7.87 MW
943591 AF1-030 C Adder 6.16 MW 5.24 MW
959091 AF2-200 C Adder 10.36 MW 8.81 MW
959101 AF2-201 C Adder 4.36 MW 3.7 MW
960381 AF2-329 C Adder 3.88 MW 3.3 MW
960591 AF2-350 C Adder 5.33 MW 4.53 MW
960721 AF2-363 C Adder 4.3 MW 3.65 MW
930481 AB1-089 C Adder 47.65 MW 40.51 MW
939321 AE1-163 C Adder 4.21 MW 3.58 MW
939351 AE1-166 C 80/20 7.32 MW 7.32 MW
939401 AE1-172 C Adder 3.82 MW 3.25 MW
946671 AF1-331 C Adder 1.74 MW 1.48 MW
962691 AG1-118 C Adder 16.1 MW 13.69 MW
962711 AG1-120 C Adder 6.26 MW 5.33 MW
941551 AE2-152 C 80/20 8.44 MW 8.44 MW
958011 AF2-095 C Adder 8.52 MW 7.25 MW
965661 AG1-434 C Adder 2.99 MW 2.54 MW
945351 AF1-200 FTIR 80/20 191.45 MW 191.45 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.04 MW 59.04 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 9.99 MW 9.99 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.8 MW 0.8 MW
WEC LTFEXP_WEC->PJM CLTF 2.84 MW 2.84 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.39 MW 0.39 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.2 MW 0.2 MW
TVA LTFEXP_TVA->PJM CLTF 0.87 MW 0.87 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.46 MW 0.46 MW
MEC LTFEXP_MEC->PJM CLTF 9.37 MW 9.37 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.34 MW 1.34 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.42 MW 2.42 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.56 MW 0.56 MW

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
Base Case Single AC 121.06 1075.0 A 1301.35 9.23
Elimination
Base Case Details for Eliminated Flowgate 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 4.49 MW 3.82 MW
965091 AG1-374 C Adder 11.25 MW 9.56 MW
966091 AG1-478 C Adder 1.47 MW 1.25 MW
966431 AG1-512 C Adder 1.23 MW 1.05 MW
966441 AG1-513 C Adder 0.33 MW 0.28 MW
933911 AD1-013 C Adder 1.19 MW 1.01 MW
934721 AD1-100 C Adder 13.03 MW 11.08 MW
942111 AE2-223 C Adder 1.27 MW 1.08 MW
942991 AE2-321 C Adder 5.32 MW 4.53 MW
943801 AF1-048 C Adder 2.49 MW 2.12 MW
958481 AF2-142 C Adder 7.83 MW 6.66 MW
958491 AF2-143 C Adder 7.59 MW 6.45 MW
959081 AF2-199 C Adder 4.62 MW 3.92 MW
959341 AF2-225 C Adder 4.11 MW 3.49 MW
959351 AF2-226 C Adder 1.81 MW 1.54 MW
959611 AF2-252 C Adder 1.25 MW 1.06 MW
960281 AF2-319 C Adder 1.81 MW 1.54 MW
960611 AF2-352 C Adder 1.25 MW 1.06 MW
960751 AF2-366 C Adder 4.48 MW 3.81 MW
274675 JOLIET 29;7U Adder 49.97 MW 42.47 MW
274676 JOLIET 29;8U Adder 49.07 MW 41.71 MW
274682 WAUKEGAN ;7U Adder 27.31 MW 23.21 MW
274683 WAUKEGAN ;8U Adder 29.44 MW 25.02 MW
274687 WILL CNTY;4U Adder 48.62 MW 41.32 MW
274723 RIVER EC ;12 80/20 3.62 MW 3.62 MW
274724 RIVER EC ;11 80/20 3.63 MW 3.63 MW
274751 CRETE EC ;1U 80/20 1.35 MW 1.35 MW
274752 CRETE EC ;2U 80/20 1.35 MW 1.35 MW
274753 CRETE EC ;3U 80/20 1.35 MW 1.35 MW
274754 CRETE EC ;4U 80/20 1.35 MW 1.35 MW
274788 SE CHICAG;5U 80/20 5.54 MW 5.54 MW
274789 SE CHICAG;6U 80/20 5.54 MW 5.54 MW
274790 SE CHICAG;7U 80/20 5.54 MW 5.54 MW
274791 SE CHICAG;8U 80/20 5.54 MW 5.54 MW
274792 SE CHICAG;9U 80/20 5.47 MW 5.47 MW
274793 SE CHICAG;0U 80/20 5.47 MW 5.47 MW
274794 SE CHICAG;1U 80/20 5.47 MW 5.47 MW
274795 SE CHICAG;2U 80/20 5.47 MW 5.47 MW
274798 UNIV PARK;1U 80/20 0.86 MW 0.86 MW
274800 UNIV PARK;3U 80/20 0.85 MW 0.85 MW
274801 UNIV PARK;4U 80/20 0.85 MW 0.85 MW
274826 FISK ;BP 80/20 1.65 MW 1.65 MW
274827 FISK ;RP 80/20 1.17 MW 1.17 MW
276164 X3-005 C 80/20 0.07 MW 0.07 MW
933411 AC2-154 C Adder 1.9 MW 1.62 MW
938511 AE1-070 1 Adder 6.29 MW 5.35 MW
938521 AE1-070 2 Adder 5.75 MW 4.89 MW
939061 AE1-134 2 Adder 0.89 MW 0.76 MW
946501 AF1-314 C Adder 2.84 MW 2.41 MW
946661 AF1-330 C Adder 1.3 MW 1.11 MW
957331 AF2-027 C Adder 1.65 MW 1.4 MW
957401 AF2-034 C Adder 0.97 MW 0.82 MW
957471 AF2-041 C Adder 13.85 MW 11.77 MW
958021 AF2-096 C Adder 16.27 MW 13.83 MW
274674 JOLIET 9 ;6U Adder 25.74 MW 21.88 MW
938851 AE1-113 C Adder 5.43 MW 4.62 MW
934101 AD2-000 1 Adder 3.69 MW 3.14 MW
934111 AD2-000 2 Adder 4.08 MW 3.47 MW
276678 AD1-016 C Adder 0.6 MW 0.51 MW
276679 AD1-129 C Adder 0.59 MW 0.5 MW
957751 AF2-069 C Adder 0.16 MW 0.13 MW
926821 AC1-168 C Adder 0.75 MW 0.64 MW
934051 AD1-031 C Adder 1.9 MW 1.61 MW
936291 AD2-038 C Adder 2.23 MW 1.89 MW
936371 AD2-047 C Adder 3.4 MW 2.89 MW
936461 AD2-060 C Adder 2.0 MW 1.7 MW
936511 AD2-066 C Adder 5.68 MW 4.83 MW
942421 AE2-255 C Adder 2.06 MW 1.75 MW
942651 AE2-281 C Adder 0.59 MW 0.5 MW
943121 AE2-341 C Adder 8.0 MW 6.8 MW
943591 AF1-030 C Adder 5.32 MW 4.52 MW
959091 AF2-200 C Adder 9.23 MW 7.85 MW
959101 AF2-201 C Adder 3.92 MW 3.33 MW
960381 AF2-329 C Adder 3.36 MW 2.85 MW
960591 AF2-350 C Adder 6.0 MW 5.1 MW
960721 AF2-363 C Adder 3.82 MW 3.25 MW
961011 AF2-392 C Adder 2.59 MW 2.2 MW
961021 AF2-393 C Adder 4.05 MW 3.44 MW
961031 AF2-394 C Adder 2.94 MW 2.5 MW
961501 AF2-441 C 80/20 10.92 MW 10.92 MW
961651 AG1-005 C Adder 8.72 MW 7.42 MW
930481 AB1-089 C Adder 42.65 MW 36.26 MW
938861 AE1-114 C Adder 2.56 MW 2.18 MW
939321 AE1-163 C Adder 4.13 MW 3.51 MW
939351 AE1-166 C Adder 6.78 MW 5.76 MW
939401 AE1-172 C Adder 3.56 MW 3.02 MW
939741 AE1-205 C Adder 5.48 MW 4.66 MW
946321 AF1-296 C Adder 2.6 MW 2.21 MW
946671 AF1-331 C Adder 1.54 MW 1.31 MW
962691 AG1-118 C Adder 14.22 MW 12.08 MW
962711 AG1-120 C Adder 5.57 MW 4.73 MW
964361 AG1-298 C 80/20 68.75 MW 68.75 MW
941551 AE2-152 C Adder 7.82 MW 6.64 MW
941731 AE2-173 C Adder 3.26 MW 2.77 MW
957371 AF2-031 C 80/20 1.18 MW 1.18 MW
957761 AF2-070 C Adder 0.22 MW 0.19 MW
958011 AF2-095 C Adder 9.6 MW 8.16 MW
965661 AG1-434 C Adder 2.68 MW 2.27 MW
965671 AG1-435 C Adder 2.53 MW 2.15 MW
965931 AG1-462 C Adder 10.56 MW 8.97 MW
945351 AF1-200 FTIR Adder 177.23 MW 150.64 MW
990547 J1333 G External Queue 40.55 MW 40.55 MW
990552 J1334 G External Queue 36.92 MW 36.92 MW
990647 J1355 External Queue 45.41 MW 45.41 MW
991377 J1861 G External Queue 13.46 MW 13.46 MW
991572 J2187 External Queue 42.95 MW 42.95 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 75.78 MW 75.78 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.89 MW 11.89 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.74 MW 0.74 MW
WEC LTFEXP_WEC->PJM CLTF 2.58 MW 2.58 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.3 MW 0.3 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.15 MW 0.15 MW
TVA LTFEXP_TVA->PJM CLTF 1.18 MW 1.18 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.23 MW 0.23 MW
MEC LTFEXP_MEC->PJM CLTF 8.78 MW 8.78 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.6 MW 0.6 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.68 MW 2.68 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.05 MW 0.05 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.45 MW 0.45 MW

Details for E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 104.48 1483.0 STE 1549.43 14.8
Elimination
Base Case Details for Eliminated Flowgate E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 7.26 MW 6.17 MW
966091 AG1-478 C Adder 2.03 MW 1.73 MW
966441 AG1-513 C Adder 0.53 MW 0.45 MW
933911 AD1-013 C Adder 1.91 MW 1.62 MW
934721 AD1-100 C 80/20 19.89 MW 19.89 MW
937401 AD2-194 1 80/20 1.23 MW 1.23 MW
937411 AD2-194 2 80/20 1.23 MW 1.23 MW
942991 AE2-321 C Adder 8.5 MW 7.22 MW
943801 AF1-048 C Adder 3.97 MW 3.38 MW
958481 AF2-142 C Adder 11.01 MW 9.36 MW
958491 AF2-143 C Adder 10.94 MW 9.3 MW
959081 AF2-199 C Adder 7.4 MW 6.29 MW
959351 AF2-226 C 80/20 2.98 MW 2.98 MW
960281 AF2-319 C 80/20 2.98 MW 2.98 MW
960751 AF2-366 C Adder 7.24 MW 6.15 MW
274654 BRAIDWOOD;1U 80/20 25.98 MW 25.98 MW
274655 BRAIDWOOD;2U 80/20 25.27 MW 25.27 MW
274658 DRESDEN ;2U 80/20 18.82 MW 18.82 MW
274660 LASCO STA;1U 80/20 23.98 MW 23.98 MW
274661 LASCO STA;2U 80/20 24.06 MW 24.06 MW
274675 JOLIET 29;7U 80/20 77.05 MW 77.05 MW
274676 JOLIET 29;8U 80/20 75.69 MW 75.69 MW
274682 WAUKEGAN ;7U Adder 43.11 MW 36.64 MW
274683 WAUKEGAN ;8U Adder 46.47 MW 39.5 MW
274687 WILL CNTY;4U 80/20 72.72 MW 72.72 MW
274728 ELWOOD EC;5P 80/20 3.16 MW 3.16 MW
274729 ELWOOD EC;1P 80/20 3.16 MW 3.16 MW
274730 ELWOOD EC;6P 80/20 3.16 MW 3.16 MW
274731 ELWOOD EC;2P 80/20 3.16 MW 3.16 MW
274732 ELWOOD EC;7P 80/20 3.16 MW 3.16 MW
274733 ELWOOD EC;3P 80/20 3.16 MW 3.16 MW
274734 ELWOOD EC;8P 80/20 3.16 MW 3.16 MW
274735 ELWOOD EC;4P 80/20 3.16 MW 3.16 MW
274736 ELWOOD EC;9P 80/20 3.16 MW 3.16 MW
274737 AURORA EC;1P 80/20 3.35 MW 3.35 MW
274739 AURORA EC;2P 80/20 3.35 MW 3.35 MW
274742 AURORA EC;6P 80/20 1.02 MW 1.02 MW
274743 AURORA EC;7P 80/20 1.02 MW 1.02 MW
274744 AURORA EC;8P 80/20 1.02 MW 1.02 MW
274745 AURORA EC;9P 80/20 1.02 MW 1.02 MW
274746 AURORA EC;0P 80/20 1.02 MW 1.02 MW
274847 GR RIDGE ;BU 80/20 0.56 MW 0.56 MW
274861 TOP CROP ;1U 80/20 0.41 MW 0.41 MW
274862 TOP CROP ;2U 80/20 0.79 MW 0.79 MW
274871 GR RIDGE ;2U 80/20 0.21 MW 0.21 MW
933411 AC2-154 C Adder 2.28 MW 1.94 MW
938511 AE1-070 1 80/20 9.82 MW 9.82 MW
938521 AE1-070 2 80/20 8.97 MW 8.97 MW
946501 AF1-314 C Adder 4.5 MW 3.83 MW
946661 AF1-330 C Adder 2.08 MW 1.77 MW
957331 AF2-027 C Adder 2.6 MW 2.21 MW
957401 AF2-034 C 80/20 1.52 MW 1.52 MW
957471 AF2-041 C Adder 22.2 MW 18.87 MW
958021 AF2-096 C 80/20 28.25 MW 28.25 MW
274674 JOLIET 9 ;6U Adder 35.75 MW 30.39 MW
938851 AE1-113 C Adder 8.42 MW 7.15 MW
934101 AD2-000 1 80/20 5.96 MW 5.96 MW
934111 AD2-000 2 80/20 6.38 MW 6.38 MW
274704 KENDALL ;1C 80/20 3.89 MW 3.89 MW
274705 KENDALL ;1S 80/20 2.6 MW 2.6 MW
274706 KENDALL ;2C 80/20 3.89 MW 3.89 MW
274707 KENDALL ;2S 80/20 2.6 MW 2.6 MW
274708 KENDALL ;3C 80/20 3.69 MW 3.69 MW
274709 KENDALL ;3S 80/20 2.44 MW 2.44 MW
274710 KENDALL ;4C 80/20 3.65 MW 3.65 MW
274711 KENDALL ;4S 80/20 2.44 MW 2.44 MW
276640 AC1-204 GEN1 80/20 11.75 MW 11.75 MW
276642 AC1-204 GEN2 80/20 11.77 MW 11.77 MW
276658 AB1-122 CT1 80/20 11.17 MW 11.17 MW
276660 AB1-122 CT2 80/20 11.95 MW 11.95 MW
276678 AD1-016 C Adder 0.96 MW 0.82 MW
276679 AD1-129 C Adder 0.94 MW 0.8 MW
936291 AD2-038 C Adder 3.21 MW 2.73 MW
936371 AD2-047 C Adder 4.08 MW 3.47 MW
936461 AD2-060 C Adder 2.4 MW 2.04 MW
936511 AD2-066 C Adder 8.62 MW 7.33 MW
942421 AE2-255 C Adder 3.19 MW 2.71 MW
942651 AE2-281 C Adder 0.85 MW 0.72 MW
943121 AE2-341 C Adder 13.2 MW 11.22 MW
943591 AF1-030 C Adder 8.78 MW 7.46 MW
959091 AF2-200 C Adder 14.8 MW 12.58 MW
959101 AF2-201 C Adder 6.22 MW 5.29 MW
960381 AF2-329 C Adder 5.54 MW 4.71 MW
960591 AF2-350 C Adder 7.2 MW 6.12 MW
960721 AF2-363 C Adder 6.14 MW 5.22 MW
930481 AB1-089 C Adder 68.06 MW 57.85 MW
938861 AE1-114 C Adder 0.63 MW 0.54 MW
939321 AE1-163 C Adder 5.96 MW 5.06 MW
939351 AE1-166 C 80/20 10.34 MW 10.34 MW
939401 AE1-172 C Adder 5.41 MW 4.6 MW
946671 AF1-331 C Adder 2.48 MW 2.11 MW
962691 AG1-118 C Adder 22.97 MW 19.53 MW
962711 AG1-120 C Adder 8.94 MW 7.6 MW
941551 AE2-152 C 80/20 11.94 MW 11.94 MW
958011 AF2-095 C Adder 11.52 MW 9.79 MW
965661 AG1-434 C Adder 4.28 MW 3.64 MW
945351 AF1-200 FTIR 80/20 273.12 MW 273.12 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 82.85 MW 82.85 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 14.43 MW 14.43 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.06 MW 1.06 MW
WEC LTFEXP_WEC->PJM CLTF 4.06 MW 4.06 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.49 MW 0.49 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.25 MW 0.25 MW
TVA LTFEXP_TVA->PJM CLTF 1.32 MW 1.32 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.62 MW 0.62 MW
MEC LTFEXP_MEC->PJM CLTF 13.4 MW 13.4 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.8 MW 1.8 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.55 MW 3.55 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.72 MW 0.72 MW

Details for 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE/NIPS 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line
255112 to 270886 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 101.76 1091.0 B 1110.24 10.36
Elimination
Base Case Details for Eliminated Flowgate 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.09 MW 4.32 MW
966091 AG1-478 C Adder 1.46 MW 1.24 MW
966441 AG1-513 C Adder 0.37 MW 0.32 MW
933911 AD1-013 C Adder 1.34 MW 1.14 MW
934721 AD1-100 C 80/20 14.07 MW 14.07 MW
937401 AD2-194 1 80/20 0.86 MW 0.86 MW
937411 AD2-194 2 80/20 0.86 MW 0.86 MW
942991 AE2-321 C Adder 5.95 MW 5.06 MW
943801 AF1-048 C Adder 2.78 MW 2.36 MW
958481 AF2-142 C Adder 7.82 MW 6.64 MW
958491 AF2-143 C Adder 7.73 MW 6.57 MW
959081 AF2-199 C Adder 5.18 MW 4.4 MW
959351 AF2-226 C 80/20 2.03 MW 2.03 MW
960281 AF2-319 C 80/20 2.03 MW 2.03 MW
960751 AF2-366 C Adder 5.07 MW 4.31 MW
274654 BRAIDWOOD;1U 80/20 17.95 MW 17.95 MW
274655 BRAIDWOOD;2U 80/20 17.47 MW 17.47 MW
274658 DRESDEN ;2U 80/20 13.12 MW 13.12 MW
274660 LASCO STA;1U 80/20 16.67 MW 16.67 MW
274661 LASCO STA;2U 80/20 16.72 MW 16.72 MW
274675 JOLIET 29;7U 80/20 53.77 MW 53.77 MW
274676 JOLIET 29;8U 80/20 52.81 MW 52.81 MW
274682 WAUKEGAN ;7U Adder 30.17 MW 25.64 MW
274683 WAUKEGAN ;8U Adder 32.52 MW 27.64 MW
274687 WILL CNTY;4U 80/20 50.84 MW 50.84 MW
274728 ELWOOD EC;5P 80/20 2.2 MW 2.2 MW
274729 ELWOOD EC;1P 80/20 2.2 MW 2.2 MW
274730 ELWOOD EC;6P 80/20 2.2 MW 2.2 MW
274731 ELWOOD EC;2P 80/20 2.2 MW 2.2 MW
274732 ELWOOD EC;7P 80/20 2.2 MW 2.2 MW
274733 ELWOOD EC;3P 80/20 2.2 MW 2.2 MW
274734 ELWOOD EC;8P 80/20 2.2 MW 2.2 MW
274735 ELWOOD EC;4P 80/20 2.2 MW 2.2 MW
274736 ELWOOD EC;9P 80/20 2.2 MW 2.2 MW
274737 AURORA EC;1P 80/20 2.35 MW 2.35 MW
274739 AURORA EC;2P 80/20 2.35 MW 2.35 MW
274745 AURORA EC;9P 80/20 0.71 MW 0.71 MW
274751 CRETE EC ;1U 80/20 3.3 MW 3.3 MW
274752 CRETE EC ;2U 80/20 3.3 MW 3.3 MW
274753 CRETE EC ;3U 80/20 3.3 MW 3.3 MW
274754 CRETE EC ;4U 80/20 3.3 MW 3.3 MW
274847 GR RIDGE ;BU 80/20 0.39 MW 0.39 MW
274861 TOP CROP ;1U 80/20 0.28 MW 0.28 MW
274862 TOP CROP ;2U 80/20 0.54 MW 0.54 MW
274871 GR RIDGE ;2U 80/20 0.15 MW 0.15 MW
933411 AC2-154 C Adder 1.69 MW 1.43 MW
938511 AE1-070 1 80/20 6.84 MW 6.84 MW
938521 AE1-070 2 80/20 6.25 MW 6.25 MW
946501 AF1-314 C Adder 1.64 MW 1.39 MW
946661 AF1-330 C Adder 1.46 MW 1.24 MW
957331 AF2-027 C Adder 1.82 MW 1.55 MW
957401 AF2-034 C 80/20 1.06 MW 1.06 MW
957471 AF2-041 C Adder 15.54 MW 13.21 MW
958021 AF2-096 C 80/20 19.19 MW 19.19 MW
274674 JOLIET 9 ;6U Adder 25.61 MW 21.77 MW
938851 AE1-113 C Adder 5.87 MW 4.99 MW
934101 AD2-000 1 80/20 4.18 MW 4.18 MW
934111 AD2-000 2 80/20 4.45 MW 4.45 MW
274704 KENDALL ;1C 80/20 2.71 MW 2.71 MW
274705 KENDALL ;1S 80/20 1.81 MW 1.81 MW
274706 KENDALL ;2C 80/20 2.71 MW 2.71 MW
274707 KENDALL ;2S 80/20 1.81 MW 1.81 MW
274708 KENDALL ;3C 80/20 2.6 MW 2.6 MW
274709 KENDALL ;3S 80/20 1.72 MW 1.72 MW
274710 KENDALL ;4C 80/20 2.57 MW 2.57 MW
274711 KENDALL ;4S 80/20 1.72 MW 1.72 MW
276640 AC1-204 GEN1 80/20 8.19 MW 8.19 MW
276642 AC1-204 GEN2 80/20 8.2 MW 8.2 MW
276658 AB1-122 CT1 80/20 7.83 MW 7.83 MW
276660 AB1-122 CT2 80/20 8.33 MW 8.33 MW
276678 AD1-016 C Adder 0.67 MW 0.57 MW
276679 AD1-129 C Adder 0.66 MW 0.56 MW
936291 AD2-038 C Adder 2.27 MW 1.93 MW
936371 AD2-047 C Adder 3.02 MW 2.57 MW
936461 AD2-060 C Adder 1.78 MW 1.51 MW
936511 AD2-066 C Adder 6.06 MW 5.15 MW
942421 AE2-255 C Adder 2.22 MW 1.89 MW
942651 AE2-281 C Adder 0.6 MW 0.51 MW
943121 AE2-341 C Adder 9.26 MW 7.87 MW
943591 AF1-030 C Adder 6.16 MW 5.24 MW
959091 AF2-200 C Adder 10.36 MW 8.81 MW
959101 AF2-201 C Adder 4.36 MW 3.7 MW
960381 AF2-329 C Adder 3.88 MW 3.3 MW
960591 AF2-350 C Adder 5.33 MW 4.53 MW
960721 AF2-363 C Adder 4.3 MW 3.65 MW
930481 AB1-089 C Adder 47.65 MW 40.51 MW
939321 AE1-163 C Adder 4.21 MW 3.58 MW
939351 AE1-166 C 80/20 7.32 MW 7.32 MW
939401 AE1-172 C Adder 3.82 MW 3.25 MW
946671 AF1-331 C Adder 1.74 MW 1.48 MW
962691 AG1-118 C Adder 16.1 MW 13.69 MW
962711 AG1-120 C Adder 6.26 MW 5.33 MW
941551 AE2-152 C 80/20 8.44 MW 8.44 MW
958011 AF2-095 C Adder 8.52 MW 7.25 MW
965661 AG1-434 C Adder 2.99 MW 2.54 MW
945351 AF1-200 FTIR 80/20 191.45 MW 191.45 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.04 MW 59.04 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 9.99 MW 9.99 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.8 MW 0.8 MW
WEC LTFEXP_WEC->PJM CLTF 2.84 MW 2.84 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.39 MW 0.39 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.2 MW 0.2 MW
TVA LTFEXP_TVA->PJM CLTF 0.87 MW 0.87 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.46 MW 0.46 MW
MEC LTFEXP_MEC->PJM CLTF 9.37 MW 9.37 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.34 MW 1.34 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.42 MW 2.42 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.56 MW 0.56 MW

Details for UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 127.0 970.0 STE 1231.93 12.05
Elimination
Base Case Details for Eliminated Flowgate UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.94 MW 5.05 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966431 AG1-512 C 80/20 3.81 MW 3.81 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
934721 AD1-100 C Adder 16.45 MW 13.98 MW
942991 AE2-321 C Adder 6.93 MW 5.89 MW
943801 AF1-048 C Adder 3.24 MW 2.75 MW
958481 AF2-142 C 80/20 10.28 MW 10.28 MW
958491 AF2-143 C Adder 9.8 MW 8.33 MW
959081 AF2-199 C Adder 6.02 MW 5.12 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
274654 BRAIDWOOD;1U 80/20 20.71 MW 20.71 MW
274655 BRAIDWOOD;2U 80/20 20.25 MW 20.25 MW
274660 LASCO STA;1U 80/20 19.36 MW 19.36 MW
274661 LASCO STA;2U 80/20 19.42 MW 19.42 MW
274675 JOLIET 29;7U 80/20 62.31 MW 62.31 MW
274676 JOLIET 29;8U 80/20 61.15 MW 61.15 MW
274682 WAUKEGAN ;7U Adder 35.09 MW 29.82 MW
274683 WAUKEGAN ;8U Adder 37.83 MW 32.15 MW
274687 WILL CNTY;4U Adder 56.07 MW 47.66 MW
274735 ELWOOD EC;4P 80/20 2.54 MW 2.54 MW
274798 UNIV PARK;1U 80/20 0.92 MW 0.92 MW
274799 UNIV PARK;2U 80/20 0.91 MW 0.91 MW
274800 UNIV PARK;3U 80/20 0.91 MW 0.91 MW
274801 UNIV PARK;4U 80/20 0.91 MW 0.91 MW
274802 UNIV PARK;5U 80/20 1.19 MW 1.19 MW
274803 UNIV PARK;6U 80/20 1.19 MW 1.19 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
938511 AE1-070 1 Adder 7.88 MW 6.69 MW
938521 AE1-070 2 Adder 7.21 MW 6.13 MW
939061 AE1-134 2 Adder 1.15 MW 0.98 MW
946501 AF1-314 C Adder 3.67 MW 3.12 MW
946661 AF1-330 C Adder 1.7 MW 1.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957401 AF2-034 C Adder 1.18 MW 1.01 MW
957471 AF2-041 C Adder 18.07 MW 15.36 MW
958021 AF2-096 C 80/20 20.44 MW 20.44 MW
274674 JOLIET 9 ;6U Adder 31.29 MW 26.6 MW
938851 AE1-113 C Adder 6.74 MW 5.73 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.32 MW
270839 OTTER CRK; R 80/20 0.34 MW 0.34 MW
274708 KENDALL ;3C 80/20 3.17 MW 3.17 MW
274709 KENDALL ;3S 80/20 2.1 MW 2.1 MW
274710 KENDALL ;4C 80/20 3.13 MW 3.13 MW
274711 KENDALL ;4S 80/20 2.1 MW 2.1 MW
276640 AC1-204 GEN1 80/20 9.45 MW 9.45 MW
276642 AC1-204 GEN2 80/20 9.44 MW 9.44 MW
276678 AD1-016 C Adder 0.79 MW 0.67 MW
276679 AD1-129 C Adder 0.76 MW 0.65 MW
957751 AF2-069 C Adder 0.2 MW 0.17 MW
274805 UNIV PK N;1U 80/20 1.78 MW 1.78 MW
274806 UNIV PK N;2U 80/20 1.76 MW 1.76 MW
274807 UNIV PK N;3U 80/20 1.79 MW 1.79 MW
274808 UNIV PK N;4U 80/20 1.78 MW 1.78 MW
274809 UNIV PK N;5U 80/20 1.76 MW 1.76 MW
274810 UNIV PK N;6U 80/20 1.78 MW 1.78 MW
274811 UNIV PK N;7U 80/20 1.79 MW 1.79 MW
274812 UNIV PK N;8U 80/20 1.78 MW 1.78 MW
274813 UNIV PK N;9U 80/20 1.78 MW 1.78 MW
274814 UNIV PK N;0U 80/20 1.77 MW 1.77 MW
274815 UNIV PK N;XU 80/20 1.78 MW 1.78 MW
274816 UNIV PK N;YU 80/20 1.79 MW 1.79 MW
926821 AC1-168 C Adder 0.96 MW 0.82 MW
934051 AD1-031 C Adder 2.4 MW 2.04 MW
936291 AD2-038 C Adder 2.88 MW 2.44 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959101 AF2-201 C Adder 5.08 MW 4.31 MW
960381 AF2-329 C Adder 4.55 MW 3.87 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960721 AF2-363 C Adder 5.02 MW 4.26 MW
961011 AF2-392 C Adder 3.34 MW 2.84 MW
961021 AF2-393 C Adder 5.22 MW 4.44 MW
961031 AF2-394 C Adder 3.8 MW 3.23 MW
961501 AF2-441 C Adder 7.21 MW 6.13 MW
961651 AG1-005 C Adder 11.02 MW 9.37 MW
930481 AB1-089 C Adder 55.5 MW 47.18 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
946321 AF1-296 C Adder 3.32 MW 2.83 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962711 AG1-120 C Adder 7.31 MW 6.21 MW
964361 AG1-298 C Adder 45.31 MW 38.51 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
957761 AF2-070 C Adder 0.28 MW 0.24 MW
958011 AF2-095 C Adder 10.72 MW 9.11 MW
965661 AG1-434 C Adder 3.48 MW 2.96 MW
965671 AG1-435 C Adder 3.2 MW 2.72 MW
965931 AG1-462 C Adder 5.85 MW 4.97 MW
945351 AF1-200 FTIR Adder 262.82 MW 223.39 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.47 MW 69.47 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.78 MW 11.78 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.53 MW 1.53 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.84 MW 2.84 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 143.05 971.0 B 1389.01 12.05
Elimination
Base Case Details for Eliminated Flowgate AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.94 MW 5.05 MW
965681 AG1-436 C 80/20 63.95 MW 63.95 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966431 AG1-512 C 80/20 3.81 MW 3.81 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
934721 AD1-100 C Adder 16.45 MW 13.98 MW
942991 AE2-321 C Adder 6.93 MW 5.89 MW
943801 AF1-048 C Adder 3.24 MW 2.75 MW
958481 AF2-142 C 80/20 10.28 MW 10.28 MW
958491 AF2-143 C Adder 9.8 MW 8.33 MW
959081 AF2-199 C Adder 6.02 MW 5.12 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960681 AF2-359 C 80/20 63.95 MW 63.95 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
274654 BRAIDWOOD;1U 80/20 20.71 MW 20.71 MW
274655 BRAIDWOOD;2U 80/20 20.25 MW 20.25 MW
274660 LASCO STA;1U 80/20 19.36 MW 19.36 MW
274661 LASCO STA;2U 80/20 19.42 MW 19.42 MW
274675 JOLIET 29;7U 80/20 62.31 MW 62.31 MW
274676 JOLIET 29;8U 80/20 61.15 MW 61.15 MW
274682 WAUKEGAN ;7U Adder 35.09 MW 29.82 MW
274683 WAUKEGAN ;8U Adder 37.83 MW 32.15 MW
274687 WILL CNTY;4U Adder 56.07 MW 47.66 MW
274798 UNIV PARK;1U 80/20 0.92 MW 0.92 MW
274799 UNIV PARK;2U 80/20 0.91 MW 0.91 MW
274800 UNIV PARK;3U 80/20 0.91 MW 0.91 MW
274801 UNIV PARK;4U 80/20 0.91 MW 0.91 MW
274802 UNIV PARK;5U 80/20 1.19 MW 1.19 MW
274803 UNIV PARK;6U 80/20 1.19 MW 1.19 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
938511 AE1-070 1 Adder 7.88 MW 6.69 MW
938521 AE1-070 2 Adder 7.21 MW 6.13 MW
939061 AE1-134 2 Adder 1.15 MW 0.98 MW
946501 AF1-314 C Adder 3.67 MW 3.12 MW
946661 AF1-330 C Adder 1.7 MW 1.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957401 AF2-034 C Adder 1.18 MW 1.01 MW
957471 AF2-041 C Adder 18.07 MW 15.36 MW
958021 AF2-096 C 80/20 20.44 MW 20.44 MW
274674 JOLIET 9 ;6U Adder 31.29 MW 26.6 MW
938851 AE1-113 C Adder 6.74 MW 5.73 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.32 MW
270839 OTTER CRK; R 80/20 0.34 MW 0.34 MW
274708 KENDALL ;3C 80/20 3.17 MW 3.17 MW
274709 KENDALL ;3S 80/20 2.1 MW 2.1 MW
274710 KENDALL ;4C 80/20 3.13 MW 3.13 MW
274711 KENDALL ;4S 80/20 2.1 MW 2.1 MW
276640 AC1-204 GEN1 80/20 9.45 MW 9.45 MW
276642 AC1-204 GEN2 80/20 9.44 MW 9.44 MW
276678 AD1-016 C Adder 0.79 MW 0.67 MW
276679 AD1-129 C Adder 0.76 MW 0.65 MW
957751 AF2-069 C Adder 0.2 MW 0.17 MW
274805 UNIV PK N;1U 80/20 1.78 MW 1.78 MW
274806 UNIV PK N;2U 80/20 1.76 MW 1.76 MW
274807 UNIV PK N;3U 80/20 1.79 MW 1.79 MW
274808 UNIV PK N;4U 80/20 1.78 MW 1.78 MW
274809 UNIV PK N;5U 80/20 1.76 MW 1.76 MW
274810 UNIV PK N;6U 80/20 1.78 MW 1.78 MW
274811 UNIV PK N;7U 80/20 1.79 MW 1.79 MW
274812 UNIV PK N;8U 80/20 1.78 MW 1.78 MW
274813 UNIV PK N;9U 80/20 1.78 MW 1.78 MW
274814 UNIV PK N;0U 80/20 1.77 MW 1.77 MW
274815 UNIV PK N;XU 80/20 1.78 MW 1.78 MW
274816 UNIV PK N;YU 80/20 1.79 MW 1.79 MW
926821 AC1-168 C Adder 0.96 MW 0.82 MW
936291 AD2-038 C Adder 2.88 MW 2.44 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959101 AF2-201 C Adder 5.08 MW 4.31 MW
960381 AF2-329 C Adder 4.55 MW 3.87 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960721 AF2-363 C Adder 5.02 MW 4.26 MW
961011 AF2-392 C Adder 3.34 MW 2.84 MW
961021 AF2-393 C Adder 5.22 MW 4.44 MW
961031 AF2-394 C Adder 3.8 MW 3.23 MW
961501 AF2-441 C Adder 0.46 MW 0.39 MW
961651 AG1-005 C Adder 11.02 MW 9.37 MW
930481 AB1-089 C Adder 55.5 MW 47.18 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962711 AG1-120 C Adder 7.31 MW 6.21 MW
964361 AG1-298 C Adder 45.31 MW 38.51 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
957761 AF2-070 C Adder 0.28 MW 0.24 MW
958011 AF2-095 C Adder 10.72 MW 9.11 MW
965661 AG1-434 C Adder 3.48 MW 2.96 MW
965671 AG1-435 C Adder 3.2 MW 2.72 MW
965791 AG1-447 C 80/20 46.9 MW 46.9 MW
945351 AF1-200 FTIR Adder 262.82 MW 223.39 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.47 MW 69.47 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.78 MW 11.78 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.53 MW 1.53 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.84 MW 2.84 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

Summer Potential Congestion due to Local Energy Deliverability
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
OP AC 156.03 1479.0 B 2307.73 11.74
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
Base Case OP AC 146.24 1334.0 A 1950.91 108.15
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
OP AC 145.79 1479.0 B 2156.25 11.74
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Base Case OP AC 131.13 1201.0 A 1574.88 29.29
CE LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
274768 to 270678 ckt 1
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3'
 TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1   /*AF2-041 TP   345.0 - ELECT JCT; B 345.0
END
OP AC 129.2 1726.0 B 2229.97 76.63
CE/MEC QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line
270866 to 636610 ckt 1
EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S
CONTINGENCY 'EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S'
 OPEN BRANCH FROM BUS 636600 TO BUS 636605 CKT 1   /*SUB 39 3     345.0 - MEC CORDOVA3 345.0
END
OP AC 117.93 1471.0 B 1734.8 23.74
CE AF1-280 TP-LEE CO EC;BP 345.0 kV Ckt 1 line
946150 to 274768 ckt 1
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3'
 TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1   /*AF2-041 TP   345.0 - ELECT JCT; B 345.0
END
OP AC 117.69 1479.0 B 1740.6 77.38
CE AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line
930480 to 270916 ckt 1
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A'
 TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1   /*SILVER LK; R 345.0 - GARDEN PR; R 345.0
END
OP AC 115.72 2058.0 B 2381.42 12.56
CE LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
274768 to 270678 ckt 1
Base Case OP AC 109.41 1334.0 A 1459.48 29.25
CE BYRON ; B-AB1-089 TP 345.0 kV Ckt 1 line
270678 to 930480 ckt 1
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A'
 TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1   /*SILVER LK; R 345.0 - GARDEN PR; R 345.0
END
OP AC 104.44 2058.0 B 2149.4 12.56
CE NELSON ; B-AF1-280 TP 345.0 kV Ckt 1 line
270828 to 946150 ckt 1
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3'
 TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1   /*AF2-041 TP   345.0 - ELECT JCT; B 345.0
END
OP AC 100.5 1479.0 B 1486.41 77.38

Details for GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
OP AC 156.03 1479.0 B 2307.73 11.74
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
OP AC 154.24 1479.0 B 2281.14 11.74
Topology Case Flowgate Details for GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.04 MW 1.74 MW
962012 AG1-044 E Adder 0.07 MW 0.06 MW
962781 AG1-127 C Adder 4.91 MW 4.17 MW
962782 AG1-127 E Adder 3.27 MW 2.78 MW
290051 GSG-6; E Adder 8.21 MW 6.98 MW
295109 WESTBROOK E Adder 4.39 MW 3.73 MW
295111 SUBLETTE E Adder 2.14 MW 1.82 MW
933911 AD1-013 C Adder 1.42 MW 1.21 MW
933912 AD1-013 E Adder 2.28 MW 1.94 MW
933932 AD1-016 E Adder 0.77 MW 0.66 MW
934972 AD1-129 E Adder 0.85 MW 0.72 MW
937002 AD2-134 E Adder 7.94 MW 6.75 MW
937312 AD2-172 E 50/50 6.03 MW 6.03 MW
942991 AE2-321 C Adder 3.92 MW 3.33 MW
942992 AE2-321 E Adder 1.93 MW 1.64 MW
943801 AF1-048 C Adder 1.83 MW 1.56 MW
943802 AF1-048 E Adder 1.22 MW 1.04 MW
958912 AF2-182 E Adder 48.29 MW 41.05 MW
959081 AF2-199 C Adder 3.52 MW 2.99 MW
959082 AF2-199 E Adder 1.76 MW 1.5 MW
960582 AF2-349 E 50/50 148.41 MW 148.41 MW
960751 AF2-366 C Adder 4.9 MW 4.16 MW
960752 AF2-366 E Adder 3.26 MW 2.77 MW
274656 BYRON ;1U 50/50 44.92 MW 44.92 MW
274657 BYRON ;2U 50/50 43.94 MW 43.94 MW
274822 ROCKFORD ;11 50/50 6.55 MW 6.55 MW
274823 ROCKFORD ;21 50/50 6.59 MW 6.59 MW
274824 ROCKFORD ;12 50/50 6.51 MW 6.51 MW
274856 ECOGROVE ;U1 50/50 0.61 MW 0.61 MW
274859 EASYR;U1 E Adder 18.5 MW 15.72 MW
274860 EASYR;U2 E Adder 18.5 MW 15.72 MW
276590 R-018 50/50 0.24 MW 0.24 MW
293715 O-029 E Adder 9.2 MW 7.82 MW
293716 O-029 E Adder 5.05 MW 4.29 MW
293717 O-029 E Adder 4.64 MW 3.94 MW
294763 P-046 E 50/50 16.76 MW 16.76 MW
939061 AE1-134 2 Adder 1.54 MW 1.31 MW
940502 AE2-035 E 50/50 6.03 MW 6.03 MW
946501 AF1-314 C 50/50 7.74 MW 7.74 MW
946502 AF1-314 E 50/50 36.35 MW 36.35 MW
946661 AF1-330 C Adder 0.88 MW 0.75 MW
946662 AF1-330 E Adder 0.19 MW 0.16 MW
957471 AF2-041 C Adder 10.57 MW 8.98 MW
957472 AF2-041 E Adder 5.28 MW 4.49 MW
274760 LEE CO EC;1U 50/50 2.28 MW 2.28 MW
276611 AD2-172 C 50/50 0.66 MW 0.66 MW
276612 AE2-035 C 50/50 0.66 MW 0.66 MW
276678 AD1-016 C Adder 0.47 MW 0.4 MW
276679 AD1-129 C Adder 1.27 MW 1.08 MW
293516 O-009 E Adder 17.8 MW 15.13 MW
290108 LEEDK;1U E Adder 15.68 MW 13.33 MW
916221 Z1-073 E Adder 5.78 MW 4.92 MW
274761 LEE CO EC;2U 50/50 2.28 MW 2.28 MW
274762 LEE CO EC;3U 50/50 2.28 MW 2.28 MW
274763 LEE CO EC;4U 50/50 2.25 MW 2.25 MW
274764 LEE CO EC;5U 50/50 2.28 MW 2.28 MW
274765 LEE CO EC;6U 50/50 2.28 MW 2.28 MW
959091 AF2-200 C Adder 7.04 MW 5.99 MW
959092 AF2-200 E Adder 4.7 MW 3.99 MW
959101 AF2-201 C 50/50 10.69 MW 10.69 MW
959102 AF2-201 E 50/50 30.69 MW 30.69 MW
960721 AF2-363 C Adder 7.5 MW 6.37 MW
960722 AF2-363 E Adder 5.0 MW 4.25 MW
961011 AF2-392 C Adder 4.48 MW 3.81 MW
961012 AF2-392 E Adder 20.86 MW 17.73 MW
961021 AF2-393 C Adder 7.0 MW 5.95 MW
961031 AF2-394 C Adder 5.09 MW 4.33 MW
966822 AG1-553 E Adder 28.49 MW 24.21 MW
930481 AB1-089 C 50/50 139.2 MW 139.2 MW
930482 AB1-089 E 50/50 6.33 MW 6.33 MW
938861 AE1-114 C 50/50 6.01 MW 6.01 MW
938862 AE1-114 E 50/50 20.5 MW 20.5 MW
946152 AF1-280 E Adder 32.2 MW 27.37 MW
946321 AF1-296 C Adder 3.87 MW 3.29 MW
946322 AF1-296 E Adder 18.12 MW 15.41 MW
946671 AF1-331 C Adder 1.85 MW 1.57 MW
962691 AG1-118 C Adder 12.3 MW 10.46 MW
962692 AG1-118 E Adder 8.2 MW 6.97 MW
962711 AG1-120 C Adder 10.92 MW 9.28 MW
962712 AG1-120 E Adder 7.28 MW 6.19 MW
965661 AG1-434 C Adder 2.66 MW 2.26 MW
965662 AG1-434 E Adder 10.56 MW 8.97 MW
965931 AG1-462 C Adder 15.35 MW 13.04 MW
965932 AG1-462 E Adder 10.23 MW 8.7 MW
961022 AF2-393 E Adder 0.64 MW 0.54 MW
276626 AG1-044 E Adder 0.08 MW 0.07 MW
920272 AA2-123 E Adder 1.26 MW 1.07 MW
955972 J1084 External Queue 10.99 MW 10.99 MW
956412 J1131 External Queue 5.82 MW 5.82 MW
956832 J1181 C External Queue 1.66 MW 1.66 MW
956833 J1181 E External Queue 8.96 MW 8.96 MW
990117 J1214 G External Queue 38.33 MW 38.33 MW
990407 J1304 G External Queue 9.34 MW 9.34 MW
990512 J1326 G External Queue 9.6 MW 9.6 MW
990727 J1377 G External Queue 16.4 MW 16.4 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
990948 J1432 E External Queue 15.13 MW 15.13 MW
991092 J1477 External Queue 2.91 MW 2.91 MW
991392 J1884 External Queue 17.87 MW 17.87 MW
991417 J1934 External Queue -8.23 MW -8.23 MW
991667 J2272 External Queue 15.58 MW 15.58 MW
991687 J2304 G External Queue 43.39 MW 43.39 MW
991777 J1629 G External Queue 10.92 MW 10.92 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.74 MW 59.74 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.71 MW 6.71 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.5 MW 0.5 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.05 MW 0.05 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.81 MW 9.81 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.28 MW 2.28 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.22 MW 3.22 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

Details for AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
Base Case OP AC 146.24 1334.0 A 1950.91 108.15
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1
Base Case OP AC 145.39 1334.0 A 1939.51 108.17
Topology Case Flowgate Details for AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.58 MW 1.34 MW
962012 AG1-044 E 50/50 0.11 MW 0.11 MW
290051 GSG-6; E Adder 6.48 MW 5.51 MW
295109 WESTBROOK E Adder 3.47 MW 2.95 MW
295111 SUBLETTE E Adder 1.69 MW 1.43 MW
933911 AD1-013 C Adder 1.09 MW 0.93 MW
933912 AD1-013 E Adder 1.75 MW 1.48 MW
937002 AD2-134 E Adder 6.27 MW 5.33 MW
937312 AD2-172 E Adder 3.09 MW 2.62 MW
958912 AF2-182 E 50/50 60.31 MW 60.31 MW
959081 AF2-199 C 50/50 32.45 MW 32.45 MW
959082 AF2-199 E 50/50 16.22 MW 16.22 MW
274715 NELSON EC;1C 50/50 6.17 MW 6.17 MW
274716 NELSON EC;1S 50/50 4.5 MW 4.5 MW
274717 NELSON EC;2C 50/50 6.21 MW 6.21 MW
274718 NELSON EC;2S 50/50 4.54 MW 4.54 MW
274859 EASYR;U1 E Adder 19.2 MW 16.32 MW
274860 EASYR;U2 E Adder 19.2 MW 16.32 MW
293715 O-029 E Adder 15.51 MW 13.18 MW
293716 O-029 E Adder 8.5 MW 7.23 MW
293717 O-029 E Adder 7.81 MW 6.64 MW
293771 O-035 E Adder 4.33 MW 3.68 MW
294401 BSHIL;1U E Adder 6.66 MW 5.66 MW
294410 BSHIL;2U E Adder 6.66 MW 5.66 MW
294763 P-046 E Adder 8.58 MW 7.3 MW
925582 AC1-033 E Adder 7.3 MW 6.21 MW
939051 AE1-134 1 50/50 0.44 MW 0.44 MW
939061 AE1-134 2 50/50 2.94 MW 2.94 MW
940502 AE2-035 E Adder 3.09 MW 2.62 MW
946501 AF1-314 C Adder 3.96 MW 3.37 MW
946502 AF1-314 E Adder 18.62 MW 15.82 MW
957471 AF2-041 C 50/50 97.34 MW 97.34 MW
957472 AF2-041 E 50/50 48.67 MW 48.67 MW
274760 LEE CO EC;1U 50/50 2.36 MW 2.36 MW
276676 AA2-030 GEN 50/50 5.75 MW 5.75 MW
276677 AA1-146 50/50 6.96 MW 6.96 MW
293516 O-009 E Adder 29.98 MW 25.48 MW
916212 CRESCENT ;1U Adder 3.04 MW 2.58 MW
927208 AC1-214 E1 Adder 2.05 MW 1.74 MW
927209 AC1-214 E2 Adder 2.05 MW 1.74 MW
957751 AF2-069 C Adder 0.15 MW 0.13 MW
957752 AF2-069 E Adder 0.48 MW 0.41 MW
990901 L-005 E Adder 8.87 MW 7.54 MW
916221 Z1-073 E Adder 4.57 MW 3.88 MW
274761 LEE CO EC;2U 50/50 2.36 MW 2.36 MW
274762 LEE CO EC;3U 50/50 2.36 MW 2.36 MW
274763 LEE CO EC;4U 50/50 2.34 MW 2.34 MW
274764 LEE CO EC;5U 50/50 2.37 MW 2.37 MW
274765 LEE CO EC;6U 50/50 2.37 MW 2.37 MW
934051 AD1-031 C Adder 2.19 MW 1.86 MW
934052 AD1-031 E Adder 3.57 MW 3.04 MW
959091 AF2-200 C 50/50 64.89 MW 64.89 MW
959092 AF2-200 E 50/50 43.26 MW 43.26 MW
959101 AF2-201 C Adder 5.47 MW 4.65 MW
959102 AF2-201 E Adder 15.72 MW 13.36 MW
961011 AF2-392 C 50/50 7.15 MW 7.15 MW
961012 AF2-392 E 50/50 33.27 MW 33.27 MW
961021 AF2-393 C 50/50 11.17 MW 11.17 MW
961031 AF2-394 C 50/50 8.13 MW 8.13 MW
966822 AG1-553 E Adder 49.65 MW 42.2 MW
930481 AB1-089 C Adder 41.08 MW 34.92 MW
930482 AB1-089 E Adder 1.87 MW 1.59 MW
938861 AE1-114 C Adder 4.69 MW 3.98 MW
938862 AE1-114 E Adder 15.99 MW 13.59 MW
946152 AF1-280 E 50/50 40.21 MW 40.21 MW
946321 AF1-296 C Adder 6.39 MW 5.43 MW
946322 AF1-296 E Adder 29.9 MW 25.42 MW
946671 AF1-331 C Adder 1.42 MW 1.21 MW
957761 AF2-070 C Adder 0.21 MW 0.18 MW
957762 AF2-070 E Adder 1.02 MW 0.87 MW
965661 AG1-434 C 50/50 16.41 MW 16.41 MW
965662 AG1-434 E 50/50 65.16 MW 65.16 MW
965671 AG1-435 C Adder 2.51 MW 2.13 MW
965672 AG1-435 E Adder 8.19 MW 6.96 MW
965931 AG1-462 C Adder 26.75 MW 22.73 MW
965932 AG1-462 E Adder 17.83 MW 15.16 MW
961022 AF2-393 E 50/50 1.02 MW 1.02 MW
276626 AG1-044 E 50/50 0.11 MW 0.11 MW
955972 J1084 External Queue 20.95 MW 20.95 MW
956412 J1131 External Queue 10.98 MW 10.98 MW
956832 J1181 C External Queue 2.06 MW 2.06 MW
956833 J1181 E External Queue 11.13 MW 11.13 MW
990947 J1432 C External Queue 4.71 MW 4.71 MW
990948 J1432 E External Queue 25.5 MW 25.5 MW
991092 J1477 External Queue 5.5 MW 5.5 MW
991667 J2272 External Queue 27.47 MW 27.47 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 63.35 MW 63.35 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.34 MW 11.34 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 2.91 MW 2.91 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.37 MW 0.37 MW
NY PJM->LTFIMP_NY CLTF 0.21 MW 0.21 MW
WEC LTFEXP_WEC->PJM CLTF 0.66 MW 0.66 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.12 MW 0.12 MW
TVA LTFEXP_TVA->PJM CLTF 1.68 MW 1.68 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.08 MW 0.08 MW
MEC LTFEXP_MEC->PJM CLTF 13.46 MW 13.46 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.2 MW 0.2 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.57 MW 3.57 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.03 MW 0.03 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.38 MW 2.38 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.06 MW 0.06 MW

Details for CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
OP AC 145.79 1479.0 B 2156.25 11.74
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
OP AC 144.02 1479.0 B 2130.07 11.74
Topology Case Flowgate Details for CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.04 MW 1.74 MW
962012 AG1-044 E Adder 0.07 MW 0.06 MW
962781 AG1-127 C Adder 4.91 MW 4.17 MW
962782 AG1-127 E Adder 3.27 MW 2.78 MW
290051 GSG-6; E Adder 8.21 MW 6.98 MW
295109 WESTBROOK E Adder 4.39 MW 3.73 MW
295111 SUBLETTE E Adder 2.14 MW 1.82 MW
933911 AD1-013 C Adder 1.42 MW 1.21 MW
933912 AD1-013 E Adder 2.28 MW 1.94 MW
933932 AD1-016 E Adder 0.77 MW 0.66 MW
934972 AD1-129 E Adder 0.85 MW 0.72 MW
937002 AD2-134 E Adder 7.94 MW 6.75 MW
937312 AD2-172 E 50/50 6.03 MW 6.03 MW
942991 AE2-321 C Adder 3.92 MW 3.33 MW
942992 AE2-321 E Adder 1.93 MW 1.64 MW
943801 AF1-048 C Adder 1.83 MW 1.56 MW
943802 AF1-048 E Adder 1.22 MW 1.04 MW
958912 AF2-182 E Adder 48.29 MW 41.05 MW
959081 AF2-199 C Adder 3.52 MW 2.99 MW
959082 AF2-199 E Adder 1.76 MW 1.5 MW
960751 AF2-366 C Adder 4.9 MW 4.16 MW
960752 AF2-366 E Adder 3.26 MW 2.77 MW
274656 BYRON ;1U 50/50 44.92 MW 44.92 MW
274657 BYRON ;2U 50/50 43.94 MW 43.94 MW
274822 ROCKFORD ;11 50/50 6.55 MW 6.55 MW
274823 ROCKFORD ;21 50/50 6.59 MW 6.59 MW
274824 ROCKFORD ;12 50/50 6.51 MW 6.51 MW
274856 ECOGROVE ;U1 50/50 0.61 MW 0.61 MW
274859 EASYR;U1 E Adder 18.5 MW 15.72 MW
274860 EASYR;U2 E Adder 18.5 MW 15.72 MW
276590 R-018 50/50 0.24 MW 0.24 MW
293715 O-029 E Adder 9.2 MW 7.82 MW
293716 O-029 E Adder 5.05 MW 4.29 MW
293717 O-029 E Adder 4.64 MW 3.94 MW
294763 P-046 E 50/50 16.76 MW 16.76 MW
939061 AE1-134 2 Adder 1.54 MW 1.31 MW
940502 AE2-035 E 50/50 6.03 MW 6.03 MW
946501 AF1-314 C 50/50 7.74 MW 7.74 MW
946502 AF1-314 E 50/50 36.35 MW 36.35 MW
946661 AF1-330 C Adder 0.88 MW 0.75 MW
946662 AF1-330 E Adder 0.19 MW 0.16 MW
957471 AF2-041 C Adder 10.57 MW 8.98 MW
957472 AF2-041 E Adder 5.28 MW 4.49 MW
274760 LEE CO EC;1U 50/50 2.28 MW 2.28 MW
276611 AD2-172 C 50/50 0.66 MW 0.66 MW
276612 AE2-035 C 50/50 0.66 MW 0.66 MW
276678 AD1-016 C Adder 0.47 MW 0.4 MW
276679 AD1-129 C Adder 1.27 MW 1.08 MW
293516 O-009 E Adder 17.8 MW 15.13 MW
290108 LEEDK;1U E Adder 15.68 MW 13.33 MW
916221 Z1-073 E Adder 5.78 MW 4.92 MW
274761 LEE CO EC;2U 50/50 2.28 MW 2.28 MW
274762 LEE CO EC;3U 50/50 2.28 MW 2.28 MW
274763 LEE CO EC;4U 50/50 2.25 MW 2.25 MW
274764 LEE CO EC;5U 50/50 2.28 MW 2.28 MW
274765 LEE CO EC;6U 50/50 2.28 MW 2.28 MW
959091 AF2-200 C Adder 7.04 MW 5.99 MW
959092 AF2-200 E Adder 4.7 MW 3.99 MW
959101 AF2-201 C 50/50 10.69 MW 10.69 MW
959102 AF2-201 E 50/50 30.69 MW 30.69 MW
960721 AF2-363 C Adder 7.5 MW 6.37 MW
960722 AF2-363 E Adder 5.0 MW 4.25 MW
961011 AF2-392 C Adder 4.48 MW 3.81 MW
961012 AF2-392 E Adder 20.86 MW 17.73 MW
961021 AF2-393 C Adder 7.0 MW 5.95 MW
961031 AF2-394 C Adder 5.09 MW 4.33 MW
966822 AG1-553 E Adder 28.49 MW 24.21 MW
930481 AB1-089 C 50/50 139.2 MW 139.2 MW
930482 AB1-089 E 50/50 6.33 MW 6.33 MW
938861 AE1-114 C 50/50 6.01 MW 6.01 MW
938862 AE1-114 E 50/50 20.5 MW 20.5 MW
946152 AF1-280 E Adder 32.2 MW 27.37 MW
946321 AF1-296 C Adder 3.87 MW 3.29 MW
946322 AF1-296 E Adder 18.12 MW 15.41 MW
946671 AF1-331 C Adder 1.85 MW 1.57 MW
962691 AG1-118 C Adder 12.3 MW 10.46 MW
962692 AG1-118 E Adder 8.2 MW 6.97 MW
962711 AG1-120 C Adder 10.92 MW 9.28 MW
962712 AG1-120 E Adder 7.28 MW 6.19 MW
965661 AG1-434 C Adder 2.66 MW 2.26 MW
965662 AG1-434 E Adder 10.56 MW 8.97 MW
965931 AG1-462 C Adder 15.35 MW 13.04 MW
965932 AG1-462 E Adder 10.23 MW 8.7 MW
961022 AF2-393 E Adder 0.64 MW 0.54 MW
276626 AG1-044 E Adder 0.08 MW 0.07 MW
920272 AA2-123 E Adder 1.26 MW 1.07 MW
955972 J1084 External Queue 10.99 MW 10.99 MW
956412 J1131 External Queue 5.82 MW 5.82 MW
956832 J1181 C External Queue 1.66 MW 1.66 MW
956833 J1181 E External Queue 8.96 MW 8.96 MW
990117 J1214 G External Queue 38.33 MW 38.33 MW
990407 J1304 G External Queue 9.34 MW 9.34 MW
990512 J1326 G External Queue 9.6 MW 9.6 MW
990727 J1377 G External Queue 16.4 MW 16.4 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
990948 J1432 E External Queue 15.13 MW 15.13 MW
991092 J1477 External Queue 2.91 MW 2.91 MW
991392 J1884 External Queue 17.87 MW 17.87 MW
991417 J1934 External Queue -8.23 MW -8.23 MW
991667 J2272 External Queue 15.58 MW 15.58 MW
991687 J2304 G External Queue 43.39 MW 43.39 MW
991777 J1629 G External Queue 10.92 MW 10.92 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.74 MW 59.74 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.71 MW 6.71 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.5 MW 0.5 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.05 MW 0.05 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.81 MW 9.81 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.28 MW 2.28 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.22 MW 3.22 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Base Case OP AC 131.13 1201.0 A 1574.88 29.29
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Base Case OP AC 128.9 1201.0 A 1548.14 29.27
Topology Case Flowgate Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.99 MW 1.69 MW
962012 AG1-044 E Adder 0.04 MW 0.03 MW
962781 AG1-127 C Adder 5.5 MW 4.68 MW
962782 AG1-127 E Adder 3.66 MW 3.11 MW
966441 AG1-513 C Adder 0.27 MW 0.23 MW
966442 AG1-513 E Adder 0.41 MW 0.35 MW
290051 GSG-6; E Adder 7.9 MW 6.71 MW
295109 WESTBROOK E Adder 4.23 MW 3.6 MW
295111 SUBLETTE E Adder 2.06 MW 1.75 MW
933911 AD1-013 C Adder 1.4 MW 1.19 MW
933912 AD1-013 E Adder 2.23 MW 1.9 MW
937002 AD2-134 E Adder 7.64 MW 6.49 MW
937312 AD2-172 E Adder 1.61 MW 1.37 MW
958912 AF2-182 E Adder 22.02 MW 18.72 MW
959081 AF2-199 C 50/50 8.79 MW 8.79 MW
959082 AF2-199 E 50/50 4.39 MW 4.39 MW
960751 AF2-366 C Adder 5.49 MW 4.66 MW
960752 AF2-366 E Adder 3.66 MW 3.11 MW
274738 AURORA EC;3P 50/50 4.03 MW 4.03 MW
274740 AURORA EC;4P 50/50 4.03 MW 4.03 MW
274859 EASYR;U1 E Adder 7.41 MW 6.3 MW
274860 EASYR;U2 E Adder 7.41 MW 6.3 MW
276591 L-013 2 Adder 2.79 MW 2.37 MW
293715 O-029 E Adder 5.54 MW 4.71 MW
293716 O-029 E Adder 3.04 MW 2.58 MW
293717 O-029 E Adder 2.79 MW 2.37 MW
294763 P-046 E Adder 4.47 MW 3.8 MW
939061 AE1-134 2 Adder 0.97 MW 0.82 MW
940502 AE2-035 E Adder 1.61 MW 1.37 MW
946501 AF1-314 C Adder 2.06 MW 1.75 MW
946502 AF1-314 E Adder 9.7 MW 8.24 MW
957471 AF2-041 C 50/50 26.36 MW 26.36 MW
957472 AF2-041 E 50/50 13.18 MW 13.18 MW
293516 O-009 E Adder 10.71 MW 9.1 MW
290108 LEEDK;1U E Adder 19.02 MW 16.17 MW
916221 Z1-073 E Adder 5.57 MW 4.73 MW
943121 AE2-341 C Adder 9.74 MW 8.28 MW
943122 AE2-341 E Adder 4.78 MW 4.07 MW
943591 AF1-030 C Adder 6.48 MW 5.51 MW
943592 AF1-030 E Adder 3.21 MW 2.73 MW
959091 AF2-200 C 50/50 17.57 MW 17.57 MW
959092 AF2-200 E 50/50 11.72 MW 11.72 MW
959101 AF2-201 C Adder 2.85 MW 2.42 MW
959102 AF2-201 E Adder 8.19 MW 6.96 MW
960381 AF2-329 C Adder 4.09 MW 3.48 MW
960721 AF2-363 C Adder 3.86 MW 3.28 MW
960722 AF2-363 E Adder 2.57 MW 2.19 MW
961011 AF2-392 C Adder 2.62 MW 2.22 MW
961012 AF2-392 E Adder 12.17 MW 10.34 MW
961021 AF2-393 C Adder 4.09 MW 3.47 MW
961031 AF2-394 C Adder 2.97 MW 2.53 MW
966822 AG1-553 E Adder 16.12 MW 13.7 MW
930481 AB1-089 C Adder 33.8 MW 28.73 MW
930482 AB1-089 E Adder 1.54 MW 1.31 MW
938861 AE1-114 C Adder 2.14 MW 1.82 MW
938862 AE1-114 E Adder 7.29 MW 6.2 MW
946152 AF1-280 E Adder 14.68 MW 12.48 MW
946321 AF1-296 C Adder 2.14 MW 1.82 MW
946322 AF1-296 E Adder 10.01 MW 8.51 MW
946671 AF1-331 C Adder 1.81 MW 1.54 MW
962691 AG1-118 C 50/50 18.63 MW 18.63 MW
962692 AG1-118 E 50/50 12.42 MW 12.42 MW
962711 AG1-120 C Adder 5.62 MW 4.78 MW
962712 AG1-120 E Adder 3.75 MW 3.18 MW
965661 AG1-434 C 50/50 4.57 MW 4.57 MW
965662 AG1-434 E 50/50 18.14 MW 18.14 MW
965931 AG1-462 C Adder 8.68 MW 7.38 MW
965932 AG1-462 E Adder 5.79 MW 4.92 MW
961022 AF2-393 E Adder 0.37 MW 0.32 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
945351 AF1-200 FTIR Adder 183.16 MW 155.69 MW
955972 J1084 External Queue 7.6 MW 7.6 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 8.41 MW 8.41 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.5 MW 2.5 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.3 MW 0.3 MW
NY PJM->LTFIMP_NY CLTF 0.16 MW 0.16 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.07 MW 0.07 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.03 MW 0.03 MW
TVA LTFEXP_TVA->PJM CLTF 0.29 MW 0.29 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.12 MW 0.12 MW
MEC LTFEXP_MEC->PJM CLTF 3.92 MW 3.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.36 MW 0.36 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.82 MW 0.82 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 1.95 MW 1.95 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

Details for LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L15502_B-R_SRT-A-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
274768 to 270678 ckt 1
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3'
 TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1   /*AF2-041 TP   345.0 - ELECT JCT; B 345.0
END
OP AC 129.2 1726.0 B 2229.97 76.63
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
274768 to 270678 ckt 1
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3'
 TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1   /*AF2-041 TP   345.0 - ELECT JCT; B 345.0
END
OP AC 127.04 1726.0 B 2192.77 76.74
Topology Case Flowgate Details for LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L15502_B-R_SRT-A-3
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962012 AG1-044 E 50/50 0.17 MW 0.17 MW
958912 AF2-182 E 50/50 145.16 MW 145.16 MW
959081 AF2-199 C 50/50 22.99 MW 22.99 MW
959082 AF2-199 E 50/50 11.49 MW 11.49 MW
274715 NELSON EC;1C 50/50 9.8 MW 9.8 MW
274716 NELSON EC;1S 50/50 7.15 MW 7.15 MW
274717 NELSON EC;2C 50/50 9.87 MW 9.87 MW
274718 NELSON EC;2S 50/50 7.21 MW 7.21 MW
274857 BIG SKY ;U1 50/50 1.22 MW 1.22 MW
274858 BIG SKY ;U2 50/50 1.22 MW 1.22 MW
274859 EASYR;U1 E 50/50 55.41 MW 55.41 MW
274860 EASYR;U2 E 50/50 55.41 MW 55.41 MW
293715 O-029 E Adder 23.3 MW 19.8 MW
293716 O-029 E Adder 12.77 MW 10.86 MW
293717 O-029 E Adder 11.74 MW 9.98 MW
293771 O-035 E Adder 6.75 MW 5.74 MW
294401 BSHIL;1U E Adder 10.21 MW 8.68 MW
294410 BSHIL;2U E Adder 10.21 MW 8.68 MW
925582 AC1-033 E Adder 11.2 MW 9.52 MW
939051 AE1-134 1 50/50 0.7 MW 0.7 MW
939061 AE1-134 2 50/50 4.67 MW 4.67 MW
957471 AF2-041 C 50/50 68.97 MW 68.97 MW
957472 AF2-041 E 50/50 34.48 MW 34.48 MW
274760 LEE CO EC;1U 50/50 6.82 MW 6.82 MW
276676 AA2-030 GEN 50/50 9.14 MW 9.14 MW
276677 AA1-146 50/50 11.06 MW 11.06 MW
293516 O-009 E Adder 45.05 MW 38.29 MW
916212 CRESCENT ;1U Adder 4.74 MW 4.03 MW
927208 AC1-214 E1 Adder 3.2 MW 2.72 MW
927209 AC1-214 E2 Adder 3.2 MW 2.72 MW
957751 AF2-069 C Adder 0.23 MW 0.2 MW
957752 AF2-069 E Adder 0.75 MW 0.64 MW
990901 L-005 E Adder 13.66 MW 11.61 MW
274761 LEE CO EC;2U 50/50 6.82 MW 6.82 MW
274762 LEE CO EC;3U 50/50 6.82 MW 6.82 MW
274763 LEE CO EC;4U 50/50 6.75 MW 6.75 MW
274764 LEE CO EC;5U 50/50 6.83 MW 6.83 MW
274765 LEE CO EC;6U 50/50 6.83 MW 6.83 MW
274766 LEE CO EC;7U 50/50 6.74 MW 6.74 MW
274767 LEE CO EC;8U 50/50 6.74 MW 6.74 MW
934051 AD1-031 C Adder 3.36 MW 2.85 MW
934052 AD1-031 E Adder 5.48 MW 4.66 MW
959091 AF2-200 C 50/50 45.98 MW 45.98 MW
959092 AF2-200 E 50/50 30.65 MW 30.65 MW
961011 AF2-392 C 50/50 10.45 MW 10.45 MW
961012 AF2-392 E 50/50 48.61 MW 48.61 MW
961021 AF2-393 C Adder 16.32 MW 13.87 MW
961031 AF2-394 C Adder 11.87 MW 10.09 MW
966822 AG1-553 E Adder 73.98 MW 62.88 MW
946152 AF1-280 E 50/50 96.78 MW 96.78 MW
946321 AF1-296 C Adder 9.25 MW 7.86 MW
946322 AF1-296 E Adder 43.3 MW 36.8 MW
957761 AF2-070 C Adder 0.33 MW 0.28 MW
957762 AF2-070 E Adder 1.6 MW 1.36 MW
965661 AG1-434 C 50/50 13.49 MW 13.49 MW
965662 AG1-434 E 50/50 53.57 MW 53.57 MW
965671 AG1-435 C Adder 3.9 MW 3.31 MW
965672 AG1-435 E Adder 12.71 MW 10.8 MW
965931 AG1-462 C Adder 39.86 MW 33.88 MW
965932 AG1-462 E Adder 26.57 MW 22.59 MW
961022 AF2-393 E Adder 1.48 MW 1.26 MW
276626 AG1-044 E 50/50 0.17 MW 0.17 MW
955972 J1084 External Queue 34.57 MW 34.57 MW
956412 J1131 External Queue 18.14 MW 18.14 MW
990512 J1326 G External Queue -7.79 MW -7.79 MW
990947 J1432 C External Queue 7.21 MW 7.21 MW
990948 J1432 E External Queue 38.99 MW 38.99 MW
991092 J1477 External Queue 9.09 MW 9.09 MW
991667 J2272 External Queue 43.51 MW 43.51 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 28.15 MW 28.15 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 15.42 MW 15.42 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 6.61 MW 6.61 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.09 MW 0.09 MW
NY PJM->LTFIMP_NY CLTF 0.06 MW 0.06 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.15 MW 0.15 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.44 MW 0.44 MW
TVA LTFEXP_TVA->PJM CLTF 2.39 MW 2.39 MW
MEC LTFEXP_MEC->PJM CLTF 15.4 MW 15.4 MW
LAGN LTFEXP_LAGN->PJM CLTF 4.55 MW 4.55 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.61 MW 0.61 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.21 MW 0.21 MW

Details for QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line l/o EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE/MEC QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line
270866 to 636610 ckt 1
EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S
CONTINGENCY 'EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S'
 OPEN BRANCH FROM BUS 636600 TO BUS 636605 CKT 1   /*SUB 39 3     345.0 - MEC CORDOVA3 345.0
END
OP AC 117.93 1471.0 B 1734.8 23.74
Decrease
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE/MEC QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line
270866 to 636610 ckt 1
EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S
CONTINGENCY 'EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S'
 OPEN BRANCH FROM BUS 636600 TO BUS 636605 CKT 1   /*SUB 39 3     345.0 - MEC CORDOVA3 345.0
END
OP AC 120.43 1471.0 B 1771.48 23.77
Topology Case Flowgate Details for QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line l/o EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.97 MW 1.68 MW
962012 AG1-044 E Adder 0.08 MW 0.07 MW
962781 AG1-127 C Adder 4.03 MW 3.43 MW
962782 AG1-127 E Adder 2.68 MW 2.28 MW
290051 GSG-6; E Adder 7.94 MW 6.75 MW
295109 WESTBROOK E Adder 4.25 MW 3.62 MW
295111 SUBLETTE E Adder 2.07 MW 1.76 MW
933911 AD1-013 C Adder 1.38 MW 1.17 MW
933912 AD1-013 E Adder 2.2 MW 1.87 MW
933932 AD1-016 E Adder 0.82 MW 0.69 MW
934972 AD1-129 E Adder 0.38 MW 0.32 MW
937002 AD2-134 E Adder 7.68 MW 6.53 MW
937312 AD2-172 E Adder 2.82 MW 2.39 MW
942991 AE2-321 C Adder 4.42 MW 3.76 MW
942992 AE2-321 E Adder 2.18 MW 1.85 MW
943801 AF1-048 C Adder 2.07 MW 1.76 MW
943802 AF1-048 E Adder 1.38 MW 1.17 MW
958912 AF2-182 E 50/50 46.34 MW 46.34 MW
959081 AF2-199 C Adder 7.12 MW 6.05 MW
959082 AF2-199 E Adder 3.56 MW 3.03 MW
960582 AF2-349 E Adder 21.9 MW 18.62 MW
960751 AF2-366 C Adder 4.02 MW 3.42 MW
960752 AF2-366 E Adder 2.68 MW 2.28 MW
274662 QUAD CITI;1U 50/50 40.73 MW 40.73 MW
274663 QUAD CITI;2U 50/50 40.24 MW 40.24 MW
274699 CORDOVA ;1C 50/50 7.03 MW 7.03 MW
274700 CORDOVA ;2C 50/50 7.03 MW 7.03 MW
274701 CORDOVA ;1S 50/50 7.91 MW 7.91 MW
274715 NELSON EC;1C 50/50 4.52 MW 4.52 MW
274716 NELSON EC;1S 50/50 3.3 MW 3.3 MW
274717 NELSON EC;2C 50/50 4.55 MW 4.55 MW
274718 NELSON EC;2S 50/50 3.33 MW 3.33 MW
274859 EASYR;U1 E Adder 15.15 MW 12.88 MW
274860 EASYR;U2 E Adder 15.15 MW 12.88 MW
293715 O-029 E Adder 9.75 MW 8.28 MW
293716 O-029 E Adder 5.34 MW 4.54 MW
293717 O-029 E Adder 4.91 MW 4.17 MW
294763 P-046 E Adder 7.83 MW 6.65 MW
939051 AE1-134 1 50/50 0.32 MW 0.32 MW
939061 AE1-134 2 50/50 2.16 MW 2.16 MW
940502 AE2-035 E Adder 2.82 MW 2.39 MW
946501 AF1-314 C Adder 3.61 MW 3.07 MW
946502 AF1-314 E Adder 16.98 MW 14.43 MW
946661 AF1-330 C Adder 1.07 MW 0.91 MW
946662 AF1-330 E Adder 0.24 MW 0.2 MW
957471 AF2-041 C Adder 21.37 MW 18.16 MW
957472 AF2-041 E Adder 10.68 MW 9.08 MW
274760 LEE CO EC;1U 50/50 1.86 MW 1.86 MW
276676 AA2-030 GEN 50/50 4.21 MW 4.21 MW
276677 AA1-146 50/50 5.1 MW 5.1 MW
276678 AD1-016 C Adder 0.5 MW 0.42 MW
276679 AD1-129 C Adder 0.56 MW 0.48 MW
293516 O-009 E Adder 18.85 MW 16.02 MW
290108 LEEDK;1U E Adder 14.9 MW 12.66 MW
916221 Z1-073 E Adder 5.6 MW 4.76 MW
274761 LEE CO EC;2U 50/50 1.86 MW 1.86 MW
274762 LEE CO EC;3U 50/50 1.86 MW 1.86 MW
274764 LEE CO EC;5U 50/50 1.87 MW 1.87 MW
274765 LEE CO EC;6U 50/50 1.87 MW 1.87 MW
959091 AF2-200 C Adder 14.24 MW 12.11 MW
959092 AF2-200 E Adder 9.5 MW 8.07 MW
959101 AF2-201 C Adder 4.99 MW 4.24 MW
959102 AF2-201 E Adder 14.33 MW 12.18 MW
960721 AF2-363 C Adder 3.7 MW 3.14 MW
960722 AF2-363 E Adder 2.46 MW 2.09 MW
961011 AF2-392 C 50/50 5.19 MW 5.19 MW
961012 AF2-392 E 50/50 24.14 MW 24.14 MW
961021 AF2-393 C 50/50 8.1 MW 8.1 MW
961031 AF2-394 C 50/50 5.89 MW 5.89 MW
966822 AG1-553 E 50/50 82.04 MW 82.04 MW
930481 AB1-089 C Adder 48.29 MW 41.05 MW
930482 AB1-089 E Adder 2.2 MW 1.87 MW
938861 AE1-114 C Adder 3.86 MW 3.28 MW
938862 AE1-114 E Adder 13.16 MW 11.19 MW
946152 AF1-280 E 50/50 30.89 MW 30.89 MW
946321 AF1-296 C Adder 2.41 MW 2.05 MW
946322 AF1-296 E Adder 11.27 MW 9.58 MW
946671 AF1-331 C Adder 1.79 MW 1.52 MW
962691 AG1-118 C Adder 12.24 MW 10.4 MW
962692 AG1-118 E Adder 8.16 MW 6.94 MW
962711 AG1-120 C Adder 5.38 MW 4.58 MW
962712 AG1-120 E Adder 3.59 MW 3.05 MW
965661 AG1-434 C Adder 4.69 MW 3.98 MW
965662 AG1-434 E Adder 18.62 MW 15.82 MW
965931 AG1-462 C 50/50 44.2 MW 44.2 MW
965932 AG1-462 E 50/50 29.46 MW 29.46 MW
961022 AF2-393 E 50/50 0.74 MW 0.74 MW
276626 AG1-044 E Adder 0.09 MW 0.08 MW
920272 AA2-123 E Adder 1.54 MW 1.31 MW
276170 Z1-108 E Adder 1.22 MW 1.04 MW
955972 J1084 External Queue 42.92 MW 42.92 MW
990117 J1214 G External Queue 23.53 MW 23.53 MW
990407 J1304 G External Queue 5.69 MW 5.69 MW
990512 J1326 G External Queue 5.89 MW 5.89 MW
990727 J1377 G External Queue 8.93 MW 8.93 MW
990947 J1432 C External Queue 7.9 MW 7.9 MW
990948 J1432 E External Queue 42.73 MW 42.73 MW
991092 J1477 External Queue -14.1 MW -14.1 MW
991392 J1884 External Queue 12.81 MW 12.81 MW
991417 J1934 External Queue 9.67 MW 9.67 MW
991667 J2272 External Queue -23.29 MW -23.29 MW
991687 J2304 G External Queue 28.49 MW 28.49 MW
991777 J1629 G External Queue 11.71 MW 11.71 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.03 MW 1.03 MW
NY PJM->LTFIMP_NY CLTF 0.53 MW 0.53 MW
WEC LTFEXP_WEC->PJM CLTF 1.13 MW 1.13 MW
COTTONWOOD PJM->LTFIMP_COTTONWOOD CLTF 7.87 MW 7.87 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.93 MW 0.93 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.59 MW 0.59 MW
PRAIRIE PJM->LTFIMP_PRAIRIE CLTF 10.92 MW 10.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.69 MW 0.69 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.2 MW 2.2 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.59 MW 6.59 MW
MDU PJM->LTFIMP_MDU CLTF 0.51 MW 0.51 MW
LTFEXP_AC1-056 LTFEXP_AC1-056->LTFIMP_AC1-056 CLTF 3.34 MW 3.34 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.15 MW 1.15 MW

Details for AF1-280 TP-LEE CO EC;BP 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L15502_B-R_SRT-A-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE AF1-280 TP-LEE CO EC;BP 345.0 kV Ckt 1 line
946150 to 274768 ckt 1
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3'
 TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1   /*AF2-041 TP   345.0 - ELECT JCT; B 345.0
END
OP AC 117.69 1479.0 B 1740.6 77.38
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE AF1-280 TP-LEE CO EC;BP 345.0 kV Ckt 1 line
946150 to 274768 ckt 1
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3'
 TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1   /*AF2-041 TP   345.0 - ELECT JCT; B 345.0
END
OP AC 115.26 1479.0 B 1704.73 77.49
Topology Case Flowgate Details for AF1-280 TP-LEE CO EC;BP 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L15502_B-R_SRT-A-3
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962012 AG1-044 E 50/50 0.17 MW 0.17 MW
958912 AF2-182 E 50/50 146.28 MW 146.28 MW
959081 AF2-199 C 50/50 23.21 MW 23.21 MW
959082 AF2-199 E 50/50 11.61 MW 11.61 MW
274662 QUAD CITI;1U 50/50 36.23 MW 36.23 MW
274663 QUAD CITI;2U 50/50 36.38 MW 36.38 MW
274699 CORDOVA ;1C 50/50 6.4 MW 6.4 MW
274700 CORDOVA ;2C 50/50 6.4 MW 6.4 MW
274701 CORDOVA ;1S 50/50 7.2 MW 7.2 MW
274715 NELSON EC;1C 50/50 9.89 MW 9.89 MW
274716 NELSON EC;1S 50/50 7.22 MW 7.22 MW
274717 NELSON EC;2C 50/50 9.97 MW 9.97 MW
274718 NELSON EC;2S 50/50 7.28 MW 7.28 MW
274848 CAMPGROVE;RU 50/50 0.23 MW 0.23 MW
274849 CRESCENT ;1U 50/50 0.16 MW 0.16 MW
274851 PROVIDENC;RU 50/50 0.17 MW 0.17 MW
274877 BISHOP HL;1U 50/50 0.4 MW 0.4 MW
274878 BISHOP HL;2U 50/50 0.4 MW 0.4 MW
276156 O-029 C 50/50 0.45 MW 0.45 MW
276157 O-029 C 50/50 0.82 MW 0.82 MW
276158 O-029 C 50/50 0.82 MW 0.82 MW
293715 O-029 E 50/50 23.62 MW 23.62 MW
293716 O-029 E 50/50 12.95 MW 12.95 MW
293717 O-029 E 50/50 11.9 MW 11.9 MW
293771 O-035 E 50/50 6.99 MW 6.99 MW
294401 BSHIL;1U E 50/50 10.51 MW 10.51 MW
294410 BSHIL;2U E 50/50 10.51 MW 10.51 MW
925581 AC1-033 C 50/50 0.26 MW 0.26 MW
925582 AC1-033 E 50/50 11.53 MW 11.53 MW
939051 AE1-134 1 50/50 0.7 MW 0.7 MW
939061 AE1-134 2 50/50 4.72 MW 4.72 MW
957471 AF2-041 C 50/50 69.64 MW 69.64 MW
957472 AF2-041 E 50/50 34.82 MW 34.82 MW
274881 WALNUT RG;1U 50/50 1.74 MW 1.74 MW
276645 AC1-214 C1 50/50 0.14 MW 0.14 MW
276646 AC1-214 C2 50/50 0.14 MW 0.14 MW
276676 AA2-030 GEN 50/50 9.23 MW 9.23 MW
276677 AA1-146 50/50 11.17 MW 11.17 MW
293516 O-009 E 50/50 45.68 MW 45.68 MW
916212 CRESCENT ;1U 50/50 4.91 MW 4.91 MW
927208 AC1-214 E1 50/50 3.31 MW 3.31 MW
927209 AC1-214 E2 50/50 3.31 MW 3.31 MW
957751 AF2-069 C 50/50 0.24 MW 0.24 MW
957752 AF2-069 E 50/50 0.78 MW 0.78 MW
990901 L-005 E 50/50 14.11 MW 14.11 MW
934051 AD1-031 C 50/50 3.46 MW 3.46 MW
934052 AD1-031 E 50/50 5.64 MW 5.64 MW
959091 AF2-200 C 50/50 46.43 MW 46.43 MW
959092 AF2-200 E 50/50 30.95 MW 30.95 MW
961011 AF2-392 C 50/50 10.58 MW 10.58 MW
961012 AF2-392 E 50/50 49.23 MW 49.23 MW
961021 AF2-393 C 50/50 16.53 MW 16.53 MW
961031 AF2-394 C 50/50 12.02 MW 12.02 MW
966822 AG1-553 E 50/50 75.04 MW 75.04 MW
946152 AF1-280 E 50/50 97.52 MW 97.52 MW
946321 AF1-296 C 50/50 9.39 MW 9.39 MW
946322 AF1-296 E 50/50 43.95 MW 43.95 MW
957761 AF2-070 C 50/50 0.34 MW 0.34 MW
957762 AF2-070 E 50/50 1.65 MW 1.65 MW
965661 AG1-434 C 50/50 13.62 MW 13.62 MW
965662 AG1-434 E 50/50 54.09 MW 54.09 MW
965671 AG1-435 C 50/50 4.03 MW 4.03 MW
965672 AG1-435 E 50/50 13.14 MW 13.14 MW
965931 AG1-462 C 50/50 40.43 MW 40.43 MW
965932 AG1-462 E 50/50 26.95 MW 26.95 MW
961022 AF2-393 E 50/50 1.5 MW 1.5 MW
276626 AG1-044 E 50/50 0.17 MW 0.17 MW
955972 J1084 External Queue 34.57 MW 34.57 MW
956412 J1131 External Queue 18.14 MW 18.14 MW
990512 J1326 G External Queue -7.79 MW -7.79 MW
990947 J1432 C External Queue 7.21 MW 7.21 MW
990948 J1432 E External Queue 38.99 MW 38.99 MW
991092 J1477 External Queue 9.09 MW 9.09 MW
991667 J2272 External Queue 43.51 MW 43.51 MW
991672 J2275 C External Queue 3.74 MW 3.74 MW
991673 J2275 E External Queue 20.23 MW 20.23 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.34 MW 0.34 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 34.48 MW 34.48 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 17.87 MW 17.87 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 10.43 MW 10.43 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.68 MW 0.68 MW
VTF LTFEXP_VFT->PJM CMTX 1.83 MW 1.83 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.37 MW 0.37 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.79 MW 0.79 MW
TVA LTFEXP_TVA->PJM CLTF 2.91 MW 2.91 MW
MEC LTFEXP_MEC->PJM CLTF 15.99 MW 15.99 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.2 MW 5.2 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.11 MW 0.11 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.38 MW 0.38 MW

Details for AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L97104__-R_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line
930480 to 270916 ckt 1
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A'
 TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1   /*SILVER LK; R 345.0 - GARDEN PR; R 345.0
END
OP AC 115.72 2058.0 B 2381.42 12.56
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line
930480 to 270916 ckt 1
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A'
 TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1   /*SILVER LK; R 345.0 - GARDEN PR; R 345.0
END
OP AC 114.99 2058.0 B 2366.45 12.57
Topology Case Flowgate Details for AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L97104__-R_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.88 MW 1.6 MW
962012 AG1-044 E Adder 0.07 MW 0.06 MW
962781 AG1-127 C Adder 4.09 MW 3.47 MW
962782 AG1-127 E Adder 2.72 MW 2.31 MW
290051 GSG-6; E Adder 7.6 MW 6.46 MW
295109 WESTBROOK E Adder 4.07 MW 3.46 MW
295111 SUBLETTE E Adder 1.98 MW 1.68 MW
933911 AD1-013 C Adder 1.31 MW 1.12 MW
933912 AD1-013 E Adder 2.1 MW 1.78 MW
933932 AD1-016 E Adder 1.03 MW 0.87 MW
934972 AD1-129 E Adder 0.8 MW 0.68 MW
937002 AD2-134 E Adder 7.35 MW 6.25 MW
937312 AD2-172 E Adder 5.72 MW 4.86 MW
942991 AE2-321 C Adder 5.31 MW 4.51 MW
942992 AE2-321 E Adder 2.62 MW 2.22 MW
943801 AF1-048 C Adder 2.48 MW 2.11 MW
943802 AF1-048 E Adder 1.66 MW 1.41 MW
958912 AF2-182 E Adder 55.8 MW 47.43 MW
959081 AF2-199 C Adder 3.77 MW 3.2 MW
959082 AF2-199 E Adder 1.88 MW 1.6 MW
960582 AF2-349 E 50/50 77.25 MW 77.25 MW
960751 AF2-366 C Adder 4.07 MW 3.46 MW
960752 AF2-366 E Adder 2.72 MW 2.31 MW
274656 BYRON ;1U 50/50 53.31 MW 53.31 MW
274657 BYRON ;2U 50/50 51.94 MW 51.94 MW
274822 ROCKFORD ;11 50/50 5.87 MW 5.87 MW
274823 ROCKFORD ;21 50/50 5.89 MW 5.89 MW
274824 ROCKFORD ;12 50/50 5.82 MW 5.82 MW
274859 EASYR;U1 E Adder 21.51 MW 18.28 MW
274860 EASYR;U2 E Adder 21.51 MW 18.28 MW
276590 R-018 50/50 0.21 MW 0.21 MW
276591 L-013 2 Adder -1.64 MW -1.39 MW
293715 O-029 E Adder 10.09 MW 8.57 MW
293716 O-029 E Adder 5.53 MW 4.7 MW
293717 O-029 E Adder 5.08 MW 4.32 MW
294401 BSHIL;1U E Adder 4.2 MW 3.57 MW
294410 BSHIL;2U E Adder 4.2 MW 3.57 MW
294763 P-046 E Adder 15.9 MW 13.52 MW
925582 AC1-033 E Adder 4.61 MW 3.92 MW
939061 AE1-134 2 Adder 1.74 MW 1.48 MW
940502 AE2-035 E Adder 5.72 MW 4.86 MW
946501 AF1-314 C Adder 7.34 MW 6.24 MW
946502 AF1-314 E Adder 34.49 MW 29.31 MW
946661 AF1-330 C Adder 1.25 MW 1.06 MW
946662 AF1-330 E Adder 0.27 MW 0.23 MW
957471 AF2-041 C Adder 11.31 MW 9.61 MW
957472 AF2-041 E Adder 5.65 MW 4.81 MW
274760 LEE CO EC;1U 50/50 2.65 MW 2.65 MW
276678 AD1-016 C Adder 0.63 MW 0.53 MW
276679 AD1-129 C Adder 1.2 MW 1.02 MW
293516 O-009 E Adder 19.5 MW 16.58 MW
290108 LEEDK;1U E Adder 13.47 MW 11.45 MW
916221 Z1-073 E Adder 5.36 MW 4.55 MW
274761 LEE CO EC;2U 50/50 2.65 MW 2.65 MW
274762 LEE CO EC;3U 50/50 2.65 MW 2.65 MW
274763 LEE CO EC;4U 50/50 2.62 MW 2.62 MW
274764 LEE CO EC;5U 50/50 2.65 MW 2.65 MW
274765 LEE CO EC;6U 50/50 2.65 MW 2.65 MW
934051 AD1-031 C Adder 1.38 MW 1.17 MW
934052 AD1-031 E Adder 2.25 MW 1.92 MW
959091 AF2-200 C Adder 7.54 MW 6.41 MW
959092 AF2-200 E Adder 5.03 MW 4.27 MW
959101 AF2-201 C Adder 10.14 MW 8.62 MW
959102 AF2-201 E Adder 29.12 MW 24.75 MW
960721 AF2-363 C Adder 6.37 MW 5.42 MW
960722 AF2-363 E Adder 4.25 MW 3.61 MW
961011 AF2-392 C Adder 4.85 MW 4.13 MW
961012 AF2-392 E Adder 22.59 MW 19.2 MW
961021 AF2-393 C Adder 7.58 MW 6.45 MW
961031 AF2-394 C Adder 5.52 MW 4.69 MW
966822 AG1-553 E Adder 32.04 MW 27.23 MW
930481 AB1-089 C 50/50 219.23 MW 219.23 MW
930482 AB1-089 E 50/50 9.96 MW 9.96 MW
938861 AE1-114 C Adder 5.88 MW 5.0 MW
938862 AE1-114 E Adder 20.08 MW 17.07 MW
946152 AF1-280 E Adder 37.2 MW 31.62 MW
946321 AF1-296 C Adder 4.3 MW 3.65 MW
946322 AF1-296 E Adder 20.13 MW 17.11 MW
946671 AF1-331 C Adder 1.7 MW 1.45 MW
962691 AG1-118 C Adder 9.97 MW 8.47 MW
962692 AG1-118 E Adder 6.64 MW 5.65 MW
962711 AG1-120 C Adder 9.29 MW 7.89 MW
962712 AG1-120 E Adder 6.19 MW 5.26 MW
965661 AG1-434 C Adder 2.91 MW 2.48 MW
965662 AG1-434 E Adder 11.57 MW 9.83 MW
965931 AG1-462 C Adder 17.26 MW 14.67 MW
965932 AG1-462 E Adder 11.51 MW 9.78 MW
961022 AF2-393 E Adder 0.69 MW 0.59 MW
276626 AG1-044 E Adder 0.09 MW 0.07 MW
920272 AA2-123 E Adder 1.79 MW 1.52 MW
955972 J1084 External Queue 12.16 MW 12.16 MW
956412 J1131 External Queue 6.4 MW 6.4 MW
956832 J1181 C External Queue 1.81 MW 1.81 MW
956833 J1181 E External Queue 9.79 MW 9.79 MW
990117 J1214 G External Queue 39.07 MW 39.07 MW
990407 J1304 G External Queue 9.44 MW 9.44 MW
990512 J1326 G External Queue 9.78 MW 9.78 MW
990727 J1377 G External Queue 16.36 MW 16.36 MW
990947 J1432 C External Queue 3.07 MW 3.07 MW
990948 J1432 E External Queue 16.6 MW 16.6 MW
991092 J1477 External Queue 3.2 MW 3.2 MW
991392 J1884 External Queue 18.91 MW 18.91 MW
991667 J2272 External Queue 17.08 MW 17.08 MW
991687 J2304 G External Queue 44.92 MW 44.92 MW
991777 J1629 G External Queue 12.58 MW 12.58 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 70.3 MW 70.3 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 7.43 MW 7.43 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.58 MW 0.58 MW
NY PJM->LTFIMP_NY CLTF 0.32 MW 0.32 MW
WEC LTFEXP_WEC->PJM CLTF 1.16 MW 1.16 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.06 MW 0.06 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.02 MW 0.02 MW
TVA LTFEXP_TVA->PJM CLTF 1.0 MW 1.0 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.22 MW 0.22 MW
MEC LTFEXP_MEC->PJM CLTF 11.02 MW 11.02 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.65 MW 0.65 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.54 MW 2.54 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.73 MW 3.73 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.12 MW 0.12 MW

Details for LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
274768 to 270678 ckt 1
Base Case OP AC 109.41 1334.0 A 1459.48 29.25
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
274768 to 270678 ckt 1
Base Case OP AC 106.94 1334.0 A 1426.63 29.27
Topology Case Flowgate Details for LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962012 AG1-044 E 50/50 0.12 MW 0.12 MW
958912 AF2-182 E 50/50 118.75 MW 118.75 MW
959081 AF2-199 C Adder 8.78 MW 7.46 MW
959082 AF2-199 E Adder 4.39 MW 3.73 MW
274715 NELSON EC;1C 50/50 7.1 MW 7.1 MW
274716 NELSON EC;1S 50/50 5.18 MW 5.18 MW
274717 NELSON EC;2C 50/50 7.15 MW 7.15 MW
274718 NELSON EC;2S 50/50 5.22 MW 5.22 MW
274857 BIG SKY ;U1 50/50 1.03 MW 1.03 MW
274858 BIG SKY ;U2 50/50 1.03 MW 1.03 MW
274859 EASYR;U1 E 50/50 47.0 MW 47.0 MW
274860 EASYR;U2 E 50/50 47.0 MW 47.0 MW
293715 O-029 E Adder 16.5 MW 14.03 MW
293716 O-029 E Adder 9.05 MW 7.69 MW
293717 O-029 E Adder 8.32 MW 7.07 MW
294401 BSHIL;1U E Adder 7.3 MW 6.2 MW
294410 BSHIL;2U E Adder 7.3 MW 6.2 MW
925582 AC1-033 E Adder 8.0 MW 6.8 MW
939051 AE1-134 1 50/50 0.51 MW 0.51 MW
939061 AE1-134 2 50/50 3.39 MW 3.39 MW
957471 AF2-041 C Adder 26.33 MW 22.38 MW
957472 AF2-041 E Adder 13.16 MW 11.19 MW
274760 LEE CO EC;1U 50/50 5.78 MW 5.78 MW
276676 AA2-030 GEN 50/50 6.62 MW 6.62 MW
276677 AA1-146 50/50 8.01 MW 8.01 MW
293516 O-009 E Adder 31.91 MW 27.13 MW
990901 L-005 E Adder 9.78 MW 8.31 MW
274761 LEE CO EC;2U 50/50 5.78 MW 5.78 MW
274762 LEE CO EC;3U 50/50 5.78 MW 5.78 MW
274763 LEE CO EC;4U 50/50 5.73 MW 5.73 MW
274764 LEE CO EC;5U 50/50 5.8 MW 5.8 MW
274765 LEE CO EC;6U 50/50 5.8 MW 5.8 MW
274766 LEE CO EC;7U 50/50 5.71 MW 5.71 MW
274767 LEE CO EC;8U 50/50 5.71 MW 5.71 MW
934051 AD1-031 C Adder 2.4 MW 2.04 MW
934052 AD1-031 E Adder 3.92 MW 3.33 MW
959091 AF2-200 C Adder 17.55 MW 14.92 MW
959092 AF2-200 E Adder 11.7 MW 9.95 MW
961011 AF2-392 C 50/50 7.32 MW 7.32 MW
961012 AF2-392 E 50/50 34.04 MW 34.04 MW
961021 AF2-393 C Adder 11.43 MW 9.71 MW
961031 AF2-394 C Adder 8.31 MW 7.07 MW
966822 AG1-553 E Adder 52.23 MW 44.4 MW
946152 AF1-280 E 50/50 79.16 MW 79.16 MW
946321 AF1-296 C Adder 6.45 MW 5.48 MW
946322 AF1-296 E Adder 30.2 MW 25.67 MW
965661 AG1-434 C Adder 6.3 MW 5.36 MW
965662 AG1-434 E Adder 25.02 MW 21.27 MW
965671 AG1-435 C Adder 2.8 MW 2.38 MW
965672 AG1-435 E Adder 9.12 MW 7.75 MW
965931 AG1-462 C Adder 28.14 MW 23.92 MW
965932 AG1-462 E Adder 18.76 MW 15.95 MW
961022 AF2-393 E Adder 1.04 MW 0.88 MW
276626 AG1-044 E 50/50 0.12 MW 0.12 MW
955972 J1084 External Queue 25.39 MW 25.39 MW
956412 J1131 External Queue 13.33 MW 13.33 MW
990512 J1326 G External Queue -9.18 MW -9.18 MW
990947 J1432 C External Queue 5.14 MW 5.14 MW
990948 J1432 E External Queue 27.82 MW 27.82 MW
991092 J1477 External Queue 6.68 MW 6.68 MW
991392 J1884 External Queue -15.99 MW -15.99 MW
991667 J2272 External Queue 31.48 MW 31.48 MW
991687 J2304 G External Queue -40.39 MW -40.39 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.07 MW 0.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 0.4 MW 0.4 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.46 MW 10.46 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 5.33 MW 5.33 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.16 MW 0.16 MW
VTF LTFEXP_VFT->PJM CMTX 0.42 MW 0.42 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.17 MW 0.17 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.39 MW 0.39 MW
TVA LTFEXP_TVA->PJM CLTF 1.66 MW 1.66 MW
MEC LTFEXP_MEC->PJM CLTF 9.5 MW 9.5 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.98 MW 2.98 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.18 MW 0.18 MW

Details for BYRON ; B-AB1-089 TP 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L97104__-R_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE BYRON ; B-AB1-089 TP 345.0 kV Ckt 1 line
270678 to 930480 ckt 1
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A'
 TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1   /*SILVER LK; R 345.0 - GARDEN PR; R 345.0
END
OP AC 104.44 2058.0 B 2149.4 12.56
Increase
Base Run Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution
CE BYRON ; B-AB1-089 TP 345.0 kV Ckt 1 line
270678 to 930480 ckt 1
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A'
 TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1   /*SILVER LK; R 345.0 - GARDEN PR; R 345.0
END
OP AC 103.71 2058.0 B 2134.39 12.57
Topology Case Flowgate Details for BYRON ; B-AB1-089 TP 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L97104__-R_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.88 MW 1.6 MW
962012 AG1-044 E Adder 0.07 MW 0.06 MW
962781 AG1-127 C Adder 4.09 MW 3.47 MW
962782 AG1-127 E Adder 2.72 MW 2.31 MW
290051 GSG-6; E Adder 7.6 MW 6.46 MW
295109 WESTBROOK E Adder 4.07 MW 3.46 MW
295111 SUBLETTE E Adder 1.98 MW 1.68 MW
933911 AD1-013 C Adder 1.31 MW 1.12 MW
933912 AD1-013 E Adder 2.1 MW 1.78 MW
933932 AD1-016 E Adder 1.03 MW 0.87 MW
934972 AD1-129 E Adder 0.8 MW 0.68 MW
937002 AD2-134 E Adder 7.35 MW 6.25 MW
937312 AD2-172 E Adder 5.72 MW 4.86 MW
942991 AE2-321 C Adder 5.31 MW 4.51 MW
942992 AE2-321 E Adder 2.62 MW 2.22 MW
943801 AF1-048 C Adder 2.48 MW 2.11 MW
943802 AF1-048 E Adder 1.66 MW 1.41 MW
958912 AF2-182 E Adder 55.8 MW 47.43 MW
959081 AF2-199 C Adder 3.77 MW 3.2 MW
959082 AF2-199 E Adder 1.88 MW 1.6 MW
960582 AF2-349 E 50/50 77.25 MW 77.25 MW
960751 AF2-366 C Adder 4.07 MW 3.46 MW
960752 AF2-366 E Adder 2.72 MW 2.31 MW
274656 BYRON ;1U 50/50 53.31 MW 53.31 MW
274657 BYRON ;2U 50/50 51.94 MW 51.94 MW
274822 ROCKFORD ;11 50/50 5.87 MW 5.87 MW
274823 ROCKFORD ;21 50/50 5.89 MW 5.89 MW
274824 ROCKFORD ;12 50/50 5.82 MW 5.82 MW
274859 EASYR;U1 E Adder 21.51 MW 18.28 MW
274860 EASYR;U2 E Adder 21.51 MW 18.28 MW
276590 R-018 50/50 0.21 MW 0.21 MW
276591 L-013 2 Adder -1.64 MW -1.39 MW
293715 O-029 E Adder 10.09 MW 8.57 MW
293716 O-029 E Adder 5.53 MW 4.7 MW
293717 O-029 E Adder 5.08 MW 4.32 MW
294401 BSHIL;1U E Adder 4.2 MW 3.57 MW
294410 BSHIL;2U E Adder 4.2 MW 3.57 MW
294763 P-046 E Adder 15.9 MW 13.52 MW
925582 AC1-033 E Adder 4.61 MW 3.92 MW
939061 AE1-134 2 Adder 1.74 MW 1.48 MW
940502 AE2-035 E Adder 5.72 MW 4.86 MW
946501 AF1-314 C Adder 7.34 MW 6.24 MW
946502 AF1-314 E Adder 34.49 MW 29.31 MW
946661 AF1-330 C Adder 1.25 MW 1.06 MW
946662 AF1-330 E Adder 0.27 MW 0.23 MW
957471 AF2-041 C Adder 11.31 MW 9.61 MW
957472 AF2-041 E Adder 5.65 MW 4.81 MW
274760 LEE CO EC;1U 50/50 2.65 MW 2.65 MW
276678 AD1-016 C Adder 0.63 MW 0.53 MW
276679 AD1-129 C Adder 1.2 MW 1.02 MW
293516 O-009 E Adder 19.5 MW 16.58 MW
290108 LEEDK;1U E Adder 13.47 MW 11.45 MW
916221 Z1-073 E Adder 5.36 MW 4.55 MW
274761 LEE CO EC;2U 50/50 2.65 MW 2.65 MW
274762 LEE CO EC;3U 50/50 2.65 MW 2.65 MW
274763 LEE CO EC;4U 50/50 2.62 MW 2.62 MW
274764 LEE CO EC;5U 50/50 2.65 MW 2.65 MW
274765 LEE CO EC;6U 50/50 2.65 MW 2.65 MW
274767 LEE CO EC;8U 50/50 2.62 MW 2.62 MW
959091 AF2-200 C Adder 7.54 MW 6.41 MW
959092 AF2-200 E Adder 5.03 MW 4.27 MW
959101 AF2-201 C Adder 10.14 MW 8.62 MW
959102 AF2-201 E Adder 29.12 MW 24.75 MW
960721 AF2-363 C Adder 6.37 MW 5.42 MW
960722 AF2-363 E Adder 4.25 MW 3.61 MW
961011 AF2-392 C Adder 4.85 MW 4.13 MW
961012 AF2-392 E Adder 22.59 MW 19.2 MW
961021 AF2-393 C Adder 7.58 MW 6.45 MW
961031 AF2-394 C Adder 5.52 MW 4.69 MW
966822 AG1-553 E Adder 32.04 MW 27.23 MW
938861 AE1-114 C Adder 5.88 MW 5.0 MW
938862 AE1-114 E Adder 20.08 MW 17.07 MW
946152 AF1-280 E Adder 37.2 MW 31.62 MW
946321 AF1-296 C Adder 4.3 MW 3.65 MW
946322 AF1-296 E Adder 20.13 MW 17.11 MW
946671 AF1-331 C Adder 1.7 MW 1.45 MW
962691 AG1-118 C Adder 9.97 MW 8.47 MW
962692 AG1-118 E Adder 6.64 MW 5.65 MW
962711 AG1-120 C Adder 9.29 MW 7.89 MW
962712 AG1-120 E Adder 6.19 MW 5.26 MW
965661 AG1-434 C Adder 2.91 MW 2.48 MW
965662 AG1-434 E Adder 11.57 MW 9.83 MW
965931 AG1-462 C Adder 17.26 MW 14.67 MW
965932 AG1-462 E Adder 11.51 MW 9.78 MW
961022 AF2-393 E Adder 0.69 MW 0.59 MW
276626 AG1-044 E Adder 0.09 MW 0.07 MW
920272 AA2-123 E Adder 1.79 MW 1.52 MW
955972 J1084 External Queue 12.16 MW 12.16 MW
956412 J1131 External Queue 6.4 MW 6.4 MW
956832 J1181 C External Queue 1.81 MW 1.81 MW
956833 J1181 E External Queue 9.79 MW 9.79 MW
990117 J1214 G External Queue 39.07 MW 39.07 MW
990407 J1304 G External Queue 9.44 MW 9.44 MW
990512 J1326 G External Queue 9.78 MW 9.78 MW
990727 J1377 G External Queue 16.36 MW 16.36 MW
990947 J1432 C External Queue 3.07 MW 3.07 MW
990948 J1432 E External Queue 16.6 MW 16.6 MW
991092 J1477 External Queue 3.2 MW 3.2 MW
991392 J1884 External Queue 18.91 MW 18.91 MW
991667 J2272 External Queue 17.08 MW 17.08 MW
991687 J2304 G External Queue 44.92 MW 44.92 MW
991777 J1629 G External Queue 12.58 MW 12.58 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 70.3 MW 70.3 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 7.43 MW 7.43 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.58 MW 0.58 MW
NY PJM->LTFIMP_NY CLTF 0.32 MW 0.32 MW
WEC LTFEXP_WEC->PJM CLTF 1.16 MW 1.16 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.06 MW 0.06 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.02 MW 0.02 MW
TVA LTFEXP_TVA->PJM CLTF 1.0 MW 1.0 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.22 MW 0.22 MW
MEC LTFEXP_MEC->PJM CLTF 11.02 MW 11.02 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.65 MW 0.65 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.54 MW 2.54 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.73 MW 3.73 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.12 MW 0.12 MW

Details for NELSON ; B-AF1-280 TP 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L15502_B-R_SRT-A-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE NELSON ; B-AF1-280 TP 345.0 kV Ckt 1 line
270828 to 946150 ckt 1
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3'
 TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1   /*AF2-041 TP   345.0 - ELECT JCT; B 345.0
END
OP AC 100.5 1479.0 B 1486.41 77.38
Increase
Topology Case Flowgate Details for NELSON ; B-AF1-280 TP 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L15502_B-R_SRT-A-3
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962012 AG1-044 E 50/50 0.17 MW 0.17 MW
959081 AF2-199 C 50/50 23.21 MW 23.21 MW
959082 AF2-199 E 50/50 11.61 MW 11.61 MW
274662 QUAD CITI;1U 50/50 36.23 MW 36.23 MW
274663 QUAD CITI;2U 50/50 36.38 MW 36.38 MW
274699 CORDOVA ;1C 50/50 6.4 MW 6.4 MW
274700 CORDOVA ;2C 50/50 6.4 MW 6.4 MW
274701 CORDOVA ;1S 50/50 7.2 MW 7.2 MW
274715 NELSON EC;1C 50/50 9.89 MW 9.89 MW
274716 NELSON EC;1S 50/50 7.22 MW 7.22 MW
274717 NELSON EC;2C 50/50 9.97 MW 9.97 MW
274718 NELSON EC;2S 50/50 7.28 MW 7.28 MW
274848 CAMPGROVE;RU 50/50 0.23 MW 0.23 MW
274849 CRESCENT ;1U 50/50 0.16 MW 0.16 MW
274851 PROVIDENC;RU 50/50 0.17 MW 0.17 MW
274877 BISHOP HL;1U 50/50 0.4 MW 0.4 MW
274878 BISHOP HL;2U 50/50 0.4 MW 0.4 MW
276156 O-029 C 50/50 0.45 MW 0.45 MW
276157 O-029 C 50/50 0.82 MW 0.82 MW
276158 O-029 C 50/50 0.82 MW 0.82 MW
293715 O-029 E 50/50 23.62 MW 23.62 MW
293716 O-029 E 50/50 12.95 MW 12.95 MW
293717 O-029 E 50/50 11.9 MW 11.9 MW
293771 O-035 E 50/50 6.99 MW 6.99 MW
294401 BSHIL;1U E 50/50 10.51 MW 10.51 MW
294410 BSHIL;2U E 50/50 10.51 MW 10.51 MW
925581 AC1-033 C 50/50 0.26 MW 0.26 MW
925582 AC1-033 E 50/50 11.53 MW 11.53 MW
939051 AE1-134 1 50/50 0.7 MW 0.7 MW
939061 AE1-134 2 50/50 4.72 MW 4.72 MW
957471 AF2-041 C 50/50 69.64 MW 69.64 MW
957472 AF2-041 E 50/50 34.82 MW 34.82 MW
274881 WALNUT RG;1U 50/50 1.74 MW 1.74 MW
276645 AC1-214 C1 50/50 0.14 MW 0.14 MW
276646 AC1-214 C2 50/50 0.14 MW 0.14 MW
276676 AA2-030 GEN 50/50 9.23 MW 9.23 MW
276677 AA1-146 50/50 11.17 MW 11.17 MW
293516 O-009 E 50/50 45.68 MW 45.68 MW
916212 CRESCENT ;1U 50/50 4.91 MW 4.91 MW
927208 AC1-214 E1 50/50 3.31 MW 3.31 MW
927209 AC1-214 E2 50/50 3.31 MW 3.31 MW
957751 AF2-069 C 50/50 0.24 MW 0.24 MW
957752 AF2-069 E 50/50 0.78 MW 0.78 MW
990901 L-005 E 50/50 14.11 MW 14.11 MW
934051 AD1-031 C 50/50 3.46 MW 3.46 MW
934052 AD1-031 E 50/50 5.64 MW 5.64 MW
959091 AF2-200 C 50/50 46.43 MW 46.43 MW
959092 AF2-200 E 50/50 30.95 MW 30.95 MW
961011 AF2-392 C 50/50 10.58 MW 10.58 MW
961012 AF2-392 E 50/50 49.23 MW 49.23 MW
961021 AF2-393 C 50/50 16.53 MW 16.53 MW
961031 AF2-394 C 50/50 12.02 MW 12.02 MW
966822 AG1-553 E 50/50 75.04 MW 75.04 MW
946321 AF1-296 C 50/50 9.39 MW 9.39 MW
946322 AF1-296 E 50/50 43.95 MW 43.95 MW
957761 AF2-070 C 50/50 0.34 MW 0.34 MW
957762 AF2-070 E 50/50 1.65 MW 1.65 MW
965661 AG1-434 C 50/50 13.62 MW 13.62 MW
965662 AG1-434 E 50/50 54.09 MW 54.09 MW
965671 AG1-435 C 50/50 4.03 MW 4.03 MW
965672 AG1-435 E 50/50 13.14 MW 13.14 MW
965931 AG1-462 C 50/50 40.43 MW 40.43 MW
965932 AG1-462 E 50/50 26.95 MW 26.95 MW
961022 AF2-393 E 50/50 1.5 MW 1.5 MW
276626 AG1-044 E 50/50 0.17 MW 0.17 MW
955972 J1084 External Queue 34.57 MW 34.57 MW
956412 J1131 External Queue 18.14 MW 18.14 MW
990512 J1326 G External Queue -7.79 MW -7.79 MW
990947 J1432 C External Queue 7.21 MW 7.21 MW
990948 J1432 E External Queue 38.99 MW 38.99 MW
991092 J1477 External Queue 9.09 MW 9.09 MW
991667 J2272 External Queue 43.51 MW 43.51 MW
991672 J2275 C External Queue 3.74 MW 3.74 MW
991673 J2275 E External Queue 20.23 MW 20.23 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.34 MW 0.34 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 34.48 MW 34.48 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 17.87 MW 17.87 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 10.43 MW 10.43 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.68 MW 0.68 MW
VTF LTFEXP_VFT->PJM CMTX 1.83 MW 1.83 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.37 MW 0.37 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.79 MW 0.79 MW
TVA LTFEXP_TVA->PJM CLTF 2.91 MW 2.91 MW
MEC LTFEXP_MEC->PJM CLTF 15.99 MW 15.99 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.2 MW 5.2 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.11 MW 0.11 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.38 MW 0.38 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Summer Potential Congestion due to Local Energy Deliverability
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
765-L11216__-S_SRT-A
CONTINGENCY '765-L11216__-S_SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
END
OP AC 103.38 1399.0 B 1446.29 18.95
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
Base Case OP AC 102.98 1754.0 A 1806.27 15.34

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o 765-L11216__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
765-L11216__-S_SRT-A
CONTINGENCY '765-L11216__-S_SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
END
OP AC 103.38 1399.0 B 1446.29 18.95
Elimination
Base Case Details for Eliminated Flowgate CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o 765-L11216__-S_SRT-A
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.09 MW 1.78 MW
962781 AG1-127 C Adder 5.57 MW 4.74 MW
962782 AG1-127 E Adder 3.71 MW 3.15 MW
966091 AG1-478 C Adder 1.52 MW 1.29 MW
966092 AG1-478 E Adder 0.38 MW 0.33 MW
966441 AG1-513 C Adder 0.41 MW 0.34 MW
966442 AG1-513 E Adder 0.61 MW 0.52 MW
290021 O50 E Adder 15.74 MW 13.38 MW
290051 GSG-6; E Adder 8.32 MW 7.07 MW
295109 WESTBROOK E Adder 4.46 MW 3.79 MW
295111 SUBLETTE E Adder 2.17 MW 1.84 MW
933911 AD1-013 C Adder 1.46 MW 1.25 MW
933912 AD1-013 E Adder 2.34 MW 1.99 MW
933932 AD1-016 E Adder 1.21 MW 1.03 MW
934721 AD1-100 C Adder 2.11 MW 1.8 MW
934722 AD1-100 E Adder 9.86 MW 8.38 MW
934972 AD1-129 E Adder 0.48 MW 0.41 MW
937002 AD2-134 E Adder 8.05 MW 6.84 MW
942991 AE2-321 C Adder 6.53 MW 5.55 MW
942992 AE2-321 E Adder 3.22 MW 2.73 MW
943801 AF1-048 C Adder 3.05 MW 2.6 MW
943802 AF1-048 E Adder 2.04 MW 1.73 MW
959081 AF2-199 C Adder 5.68 MW 4.83 MW
959082 AF2-199 E Adder 2.84 MW 2.42 MW
959351 AF2-226 C 50/50 2.37 MW 2.37 MW
959352 AF2-226 E 50/50 3.56 MW 3.56 MW
960281 AF2-319 C 50/50 2.37 MW 2.37 MW
960282 AF2-319 E 50/50 3.56 MW 3.56 MW
960582 AF2-349 E Adder 28.93 MW 24.59 MW
960751 AF2-366 C Adder 5.56 MW 4.72 MW
960752 AF2-366 E Adder 3.7 MW 3.15 MW
274654 BRAIDWOOD;1U 50/50 19.65 MW 19.65 MW
274655 BRAIDWOOD;2U 50/50 19.11 MW 19.11 MW
274675 JOLIET 29;7U Adder 59.73 MW 50.77 MW
274676 JOLIET 29;8U 50/50 58.68 MW 58.68 MW
274682 WAUKEGAN ;7U Adder 33.23 MW 28.25 MW
274683 WAUKEGAN ;8U Adder 35.82 MW 30.44 MW
274687 WILL CNTY;4U 50/50 56.58 MW 56.58 MW
274751 CRETE EC ;1U 50/50 5.43 MW 5.43 MW
274752 CRETE EC ;2U 50/50 5.43 MW 5.43 MW
274753 CRETE EC ;3U 50/50 5.43 MW 5.43 MW
274754 CRETE EC ;4U 50/50 5.43 MW 5.43 MW
274861 TOP CROP ;1U 50/50 0.33 MW 0.33 MW
274862 TOP CROP ;2U 50/50 0.63 MW 0.63 MW
276591 L-013 2 Adder 2.93 MW 2.49 MW
293061 N-015 E Adder 12.34 MW 10.49 MW
293644 O22 E1 50/50 13.62 MW 13.62 MW
293645 O22 E2 50/50 15.6 MW 15.6 MW
294392 P-010 E Adder 15.67 MW 13.32 MW
938511 AE1-070 1 Adder 7.61 MW 6.47 MW
938521 AE1-070 2 Adder 6.95 MW 5.9 MW
946661 AF1-330 C Adder 1.6 MW 1.36 MW
946662 AF1-330 E Adder 0.35 MW 0.3 MW
957331 AF2-027 C Adder 2.01 MW 1.71 MW
957332 AF2-027 E Adder 3.01 MW 2.56 MW
957401 AF2-034 C 50/50 1.19 MW 1.19 MW
957402 AF2-034 E 50/50 1.01 MW 1.01 MW
957471 AF2-041 C Adder 17.06 MW 14.5 MW
957472 AF2-041 E Adder 8.53 MW 7.25 MW
958021 AF2-096 C 50/50 21.98 MW 21.98 MW
958022 AF2-096 E 50/50 14.65 MW 14.65 MW
274674 JOLIET 9 ;6U Adder 26.94 MW 22.9 MW
938851 AE1-113 C Adder 6.49 MW 5.52 MW
938852 AE1-113 E Adder 23.02 MW 19.57 MW
934101 AD2-000 1 Adder 4.57 MW 3.88 MW
934111 AD2-000 2 Adder 4.94 MW 4.2 MW
274704 KENDALL ;1C 50/50 3.03 MW 3.03 MW
274705 KENDALL ;1S 50/50 2.03 MW 2.03 MW
274706 KENDALL ;2C 50/50 3.03 MW 3.03 MW
274707 KENDALL ;2S 50/50 2.03 MW 2.03 MW
276678 AD1-016 C Adder 0.74 MW 0.63 MW
276679 AD1-129 C Adder 0.72 MW 0.61 MW
290108 LEEDK;1U E Adder 19.1 MW 16.23 MW
916221 Z1-073 E Adder 5.86 MW 4.99 MW
936511 AD2-066 C Adder 6.57 MW 5.59 MW
936512 AD2-066 E Adder 4.38 MW 3.72 MW
942421 AE2-255 C Adder 2.46 MW 2.09 MW
942422 AE2-255 E Adder 7.38 MW 6.27 MW
943121 AE2-341 C Adder 10.13 MW 8.61 MW
943122 AE2-341 E Adder 4.97 MW 4.23 MW
943591 AF1-030 C Adder 6.74 MW 5.73 MW
943592 AF1-030 E Adder 3.33 MW 2.83 MW
959091 AF2-200 C Adder 11.37 MW 9.66 MW
959092 AF2-200 E Adder 7.58 MW 6.44 MW
960381 AF2-329 C Adder 4.25 MW 3.61 MW
960721 AF2-363 C Adder 4.71 MW 4.01 MW
960722 AF2-363 E Adder 3.14 MW 2.67 MW
930481 AB1-089 C Adder 52.29 MW 44.45 MW
930482 AB1-089 E Adder 2.38 MW 2.02 MW
946671 AF1-331 C Adder 1.9 MW 1.62 MW
962691 AG1-118 C Adder 17.64 MW 15.0 MW
962692 AG1-118 E Adder 11.76 MW 10.0 MW
962711 AG1-120 C Adder 6.87 MW 5.84 MW
962712 AG1-120 E Adder 4.58 MW 3.89 MW
276170 Z1-108 E Adder 2.34 MW 1.99 MW
920272 AA2-123 E Adder 2.3 MW 1.95 MW
276675 AE2-062 E Adder 0.12 MW 0.1 MW
945351 AF1-200 FTIR Adder 246.7 MW 209.69 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.66 MW 59.66 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 9.85 MW 9.85 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.65 MW 1.65 MW
NY PJM->LTFIMP_NY CLTF 0.89 MW 0.89 MW
WEC LTFEXP_WEC->PJM CLTF 3.13 MW 3.13 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.24 MW 0.24 MW
TVA LTFEXP_TVA->PJM CLTF 0.79 MW 0.79 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.57 MW 0.57 MW
MEC LTFEXP_MEC->PJM CLTF 10.16 MW 10.16 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.68 MW 1.68 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.46 MW 2.46 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 10.6 MW 10.6 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Topology Case Flowgate
Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Impact of Topology Modeling
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
Base Case OP AC 102.98 1754.0 A 1806.27 15.34
Elimination
Base Case Details for Eliminated Flowgate GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o Base Case
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.57 MW 1.34 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C Adder 4.06 MW 3.45 MW
962782 AG1-127 E Adder 2.7 MW 2.29 MW
966441 AG1-513 C Adder 0.29 MW 0.25 MW
966442 AG1-513 E Adder 0.44 MW 0.37 MW
290021 O50 E Adder 19.75 MW 16.79 MW
290051 GSG-6; E Adder 6.27 MW 5.33 MW
295109 WESTBROOK E Adder 3.36 MW 2.85 MW
295111 SUBLETTE E Adder 1.63 MW 1.39 MW
933911 AD1-013 C Adder 1.1 MW 0.94 MW
933912 AD1-013 E Adder 1.76 MW 1.5 MW
933932 AD1-016 E Adder 0.97 MW 0.83 MW
934972 AD1-129 E Adder 0.39 MW 0.33 MW
937002 AD2-134 E Adder 6.06 MW 5.15 MW
937312 AD2-172 E Adder 2.19 MW 1.86 MW
937401 AD2-194 1 50/50 1.29 MW 1.29 MW
937411 AD2-194 2 50/50 1.31 MW 1.31 MW
942991 AE2-321 C Adder 5.25 MW 4.46 MW
942992 AE2-321 E Adder 2.59 MW 2.2 MW
943801 AF1-048 C Adder 2.46 MW 2.09 MW
943802 AF1-048 E Adder 1.64 MW 1.39 MW
958491 AF2-143 C Adder 3.53 MW 3.0 MW
958912 AF2-182 E Adder 22.3 MW 18.96 MW
959081 AF2-199 C Adder 4.6 MW 3.91 MW
959082 AF2-199 E Adder 2.3 MW 1.96 MW
959351 AF2-226 C 50/50 5.73 MW 5.73 MW
959352 AF2-226 E 50/50 8.6 MW 8.6 MW
960281 AF2-319 C 50/50 5.73 MW 5.73 MW
960282 AF2-319 E 50/50 8.6 MW 8.6 MW
960582 AF2-349 E Adder 23.39 MW 19.88 MW
960751 AF2-366 C Adder 4.04 MW 3.44 MW
960752 AF2-366 E Adder 2.7 MW 2.29 MW
274675 JOLIET 29;7U Adder 67.75 MW 57.59 MW
274676 JOLIET 29;8U Adder 66.92 MW 56.88 MW
274682 WAUKEGAN ;7U Adder 28.21 MW 23.98 MW
274683 WAUKEGAN ;8U Adder 30.34 MW 25.79 MW
274728 ELWOOD EC;5P 50/50 3.36 MW 3.36 MW
274729 ELWOOD EC;1P 50/50 3.31 MW 3.31 MW
274730 ELWOOD EC;6P 50/50 3.36 MW 3.36 MW
274731 ELWOOD EC;2P 50/50 3.31 MW 3.31 MW
274732 ELWOOD EC;7P 50/50 3.36 MW 3.36 MW
274733 ELWOOD EC;3P 50/50 3.31 MW 3.31 MW
274734 ELWOOD EC;8P 50/50 3.36 MW 3.36 MW
274736 ELWOOD EC;9P 50/50 3.36 MW 3.36 MW
274859 EASYR;U1 E Adder 7.82 MW 6.65 MW
274860 EASYR;U2 E Adder 7.82 MW 6.65 MW
274861 TOP CROP ;1U 50/50 0.8 MW 0.8 MW
274862 TOP CROP ;2U 50/50 1.52 MW 1.52 MW
276591 L-013 2 Adder 2.21 MW 1.88 MW
293644 O22 E1 50/50 32.94 MW 32.94 MW
293645 O22 E2 50/50 37.73 MW 37.73 MW
293715 O-029 E Adder 6.38 MW 5.42 MW
293716 O-029 E Adder 3.5 MW 2.97 MW
293717 O-029 E Adder 3.22 MW 2.73 MW
293771 O-035 E Adder 4.36 MW 3.7 MW
294401 BSHIL;1U E Adder 5.69 MW 4.83 MW
294410 BSHIL;2U E Adder 5.69 MW 4.83 MW
294763 P-046 E Adder 6.08 MW 5.17 MW
925582 AC1-033 E Adder 6.23 MW 5.3 MW
938511 AE1-070 1 50/50 10.42 MW 10.42 MW
938521 AE1-070 2 50/50 9.4 MW 9.4 MW
939061 AE1-134 2 Adder 0.9 MW 0.76 MW
940502 AE2-035 E Adder 2.19 MW 1.86 MW
946501 AF1-314 C Adder 2.81 MW 2.39 MW
946502 AF1-314 E Adder 13.2 MW 11.22 MW
946661 AF1-330 C Adder 1.29 MW 1.09 MW
946662 AF1-330 E Adder 0.28 MW 0.24 MW
957331 AF2-027 C Adder 1.69 MW 1.44 MW
957332 AF2-027 E Adder 2.54 MW 2.16 MW
957401 AF2-034 C 50/50 1.66 MW 1.66 MW
957402 AF2-034 E 50/50 1.42 MW 1.42 MW
957471 AF2-041 C Adder 13.8 MW 11.73 MW
957472 AF2-041 E Adder 6.9 MW 5.87 MW
938851 AE1-113 C Adder 8.15 MW 6.92 MW
938852 AE1-113 E Adder 28.88 MW 24.55 MW
934101 AD2-000 1 Adder 4.19 MW 3.56 MW
934111 AD2-000 2 Adder 6.26 MW 5.33 MW
274704 KENDALL ;1C 50/50 4.25 MW 4.25 MW
274705 KENDALL ;1S 50/50 2.84 MW 2.84 MW
274706 KENDALL ;2C 50/50 4.25 MW 4.25 MW
274707 KENDALL ;2S 50/50 2.84 MW 2.84 MW
276640 AC1-204 GEN1 50/50 12.32 MW 12.32 MW
276642 AC1-204 GEN2 50/50 12.49 MW 12.49 MW
276678 AD1-016 C Adder 0.6 MW 0.51 MW
276679 AD1-129 C Adder 0.58 MW 0.49 MW
293516 O-009 E Adder 12.34 MW 10.49 MW
916212 CRESCENT ;1U Adder 3.06 MW 2.6 MW
927208 AC1-214 E1 Adder 2.06 MW 1.75 MW
927209 AC1-214 E2 Adder 2.06 MW 1.75 MW
957751 AF2-069 C Adder 0.15 MW 0.13 MW
957752 AF2-069 E Adder 0.49 MW 0.41 MW
990901 L-005 E Adder 8.65 MW 7.36 MW
290108 LEEDK;1U E Adder 14.0 MW 11.9 MW
916221 Z1-073 E Adder 4.42 MW 3.75 MW
934051 AD1-031 C Adder 1.9 MW 1.61 MW
934052 AD1-031 E Adder 3.1 MW 2.63 MW
936292 AD2-038 E Adder 7.85 MW 6.67 MW
936511 AD2-066 C Adder 5.47 MW 4.65 MW
936512 AD2-066 E Adder 3.65 MW 3.1 MW
942421 AE2-255 C Adder 3.09 MW 2.62 MW
942422 AE2-255 E Adder 9.26 MW 7.87 MW
959091 AF2-200 C Adder 9.2 MW 7.82 MW
959092 AF2-200 E Adder 6.14 MW 5.21 MW
959101 AF2-201 C Adder 3.88 MW 3.3 MW
959102 AF2-201 E Adder 11.14 MW 9.47 MW
960721 AF2-363 C Adder 3.57 MW 3.04 MW
960722 AF2-363 E Adder 2.38 MW 2.02 MW
961011 AF2-392 C Adder 2.58 MW 2.2 MW
961012 AF2-392 E Adder 12.02 MW 10.22 MW
961021 AF2-393 C Adder 4.04 MW 3.43 MW
961031 AF2-394 C Adder 2.94 MW 2.5 MW
961651 AG1-005 C Adder 7.75 MW 6.59 MW
961652 AG1-005 E Adder 5.17 MW 4.39 MW
966822 AG1-553 E Adder 20.08 MW 17.07 MW
930481 AB1-089 C Adder 42.12 MW 35.8 MW
930482 AB1-089 E Adder 1.91 MW 1.63 MW
938861 AE1-114 C Adder 2.54 MW 2.16 MW
938862 AE1-114 E Adder 8.66 MW 7.36 MW
939322 AE1-163 E Adder 19.12 MW 16.25 MW
946152 AF1-280 E Adder 14.87 MW 12.64 MW
946321 AF1-296 C Adder 2.64 MW 2.25 MW
946322 AF1-296 E Adder 12.38 MW 10.53 MW
946671 AF1-331 C Adder 1.43 MW 1.22 MW
962691 AG1-118 C Adder 12.8 MW 10.88 MW
962692 AG1-118 E Adder 8.53 MW 7.25 MW
962711 AG1-120 C Adder 5.21 MW 4.43 MW
962712 AG1-120 E Adder 3.47 MW 2.95 MW
957761 AF2-070 C Adder 0.21 MW 0.18 MW
957762 AF2-070 E Adder 1.03 MW 0.88 MW
965661 AG1-434 C Adder 2.67 MW 2.27 MW
965662 AG1-434 E Adder 10.62 MW 9.02 MW
965671 AG1-435 C Adder 2.42 MW 2.06 MW
965672 AG1-435 E Adder 7.9 MW 6.71 MW
965931 AG1-462 C Adder 10.82 MW 9.2 MW
965932 AG1-462 E Adder 7.21 MW 6.13 MW
961022 AF2-393 E Adder 0.37 MW 0.31 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
276170 Z1-108 E Adder 1.89 MW 1.6 MW
920272 AA2-123 E Adder 1.85 MW 1.57 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 54.4 MW 54.4 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 9.07 MW 9.07 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.97 MW 0.97 MW
NY PJM->LTFIMP_NY CLTF 0.53 MW 0.53 MW
WEC LTFEXP_WEC->PJM CLTF 2.64 MW 2.64 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.19 MW 0.19 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.09 MW 0.09 MW
TVA LTFEXP_TVA->PJM CLTF 0.97 MW 0.97 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.31 MW 0.31 MW
MEC LTFEXP_MEC->PJM CLTF 8.84 MW 8.84 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.91 MW 0.91 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.41 MW 2.41 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.24 MW 6.24 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.29 MW 0.29 MW

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle #2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle #2.

Light Load Analysis

Light Load Analysis is Not Required.

Light Load Potential Congestion due to Local Energy Deliverability

Light Load Analysis is Not Required.

Short Circuit Analysis

Based on PJM Short Circuit Analysis, this project did not contribute >1% fault duty to previously identified overduty breakers, nor did it cause any new overduty breakers.

Stability Analysis

Analysis Complete - No Issues

Executive Summary

New Service Requests (projects) in PJM Transition Cycle 1, Cluster 15 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 15 projects.

This analysis is effectively a screening study to determine whether the addition of the Cluster 15 projects will meet the dynamics requirements of the NERC, ComEd and PJM reliability standards.

The load flow scenario for the analysis was based on the RTEP 2027 summer peak load case, modified to include applicable projects. Cluster 15 projects have been dispatched online at maximum power output, with 1.0 voltage at the terminal bus.

Cluster 15 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. Steady-state condition and 83 contingencies were studied, each with a 20 second simulation time period. Studied faults included:

a)       Steady-state operation (20 second run);

b)       Three-phase faults with normal clearing time;

c)       Three-phase bus faults with normal clearing time;

d)       Three-phase faults single-phase delayed clearing due to a  stuck breaker (IPO breaker with FD Logic).

e)       Three-phase faults with three-phase delayed clearing due to a stuck breaker (GO breakers with FD Logic);

f)       Three-phase faults with three-phase delayed clearing due to a stuck breaker (GO Breakers with A-contact Logic);

g)       Three-phase faults with single-phase delayed clearing due to a stuck breaker (GO Breakers with FD Logic);

h)       Three-phase faults with loss of multiple-circuit tower line.

No relevant high-speed reclosing (HSR) contingencies nor single-phase bus faults were identified for this study.

There are no delayed (Zone 2) clearing faults due to dual primary relays being employed in the ComEd 345 kV transmission system.

For all simulations, the queue project under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance.

For all of the fault contingencies tested on the 2027 peak load case:

a)       Cluster 15 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),

b)       The system with Cluster 15 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.

c)       Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus).

d)       No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

AF2-041, AF2-199, AF2-200, and AG1-434 meet the 0.95 leading and lagging PF requirement.

AF2-041[1] exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. This issue did not cause instability in the system and the models have been tuned to achieve a faster reactive power output settlement by updating Kc and VCFlag from REPCA1 module and also Kqi from REECA1 module of both generators in AF2-041.

AG1-434[2] exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. This issue did not cause instability in the system and the models have been tuned to achieve a faster reactive power output settlement by updating Kc from REPCTA1 module in generator AG1- 434.

AF2-199[3] exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. This issue did not cause instability in the system and the models have been tuned to achieve a faster reactive power output settlement by updating Kc from REPCA1 module in generator AF2-199.

AF2-200[4] exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. This issue did not cause instability in the system and the models have been tuned to achieve a faster reactive power output settlement by updating Kc from REPCA1 module and VCFlag in generator AF2-200.

 

Table 1: TC1 Cluster 15 Projects

Project

Fuel Type

Transmission Owner

MFO

Point of Interconnection

AF2-041

Solar

ComEd

300

Nelson-Electric Junction 345 kV

AF2-199

Solar

ComEd

400

Nelson-Electric Junction 345 kV

AF2-200

Solar

ComEd

600

Nelson-Electric Junction 345 kV

AG1-434

Wind

ComEd

175

Nelson-Electric Junction 345 kV

 

The stability study results in this report identified system performance issues.  PJM is actively performing simulations to assess the impacts of potential dynamic model parameter changes required to address identified stability issues. Additionally, feedback from the Transmission Owner is being incorporated into the stability study. The study will be finalized at the conclusion of Phase III of Transition Cycle 1.

The TC1 projects in Cluster15 listed above shall confirm all parameter adjustments described in this stability results summary with their DP2 data submission. 

Reactive Power Analysis

The reactive power capability of AF2-200 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project ID Project Name Status
AA1-018 Powerton-Goodings Grove In Service
AA1-146 Nelson In Service
AA2-030 Nelson In Service
AA2-123 Marengo 34kV In Service
AB1-089 Byron-Wayne 345kV #1 Suspended
AC1-033 Kewanee 138 kV In Service
AC1-168 Kewanee-Streator Suspended
AC1-204 Elwood In Service
AC1-214 Crescent Ridge In Service
AC2-154 Davis Creek 138kV Suspended
AD1-013 Twombly Road 138kV Engineering & Procurement
AD1-016 Marengo Withdrawn
AD1-031 Kewanee - E.D. Edwards 138 kV Suspended
AD1-100 Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV Under Construction
AD1-129 Belvidere 34 kV Withdrawn
AD2-038 Powerton-Nevada 345 kV Under Construction
AD2-047 Davis Creek 138 kV Suspended
AD2-060 Davis Creek 138kV Suspended
AD2-066 Mazon-Crescent Ridge 138 kV Engineering & Procurement
AD2-134 Shady Oaks Partially in Service - Under Construction
AD2-172 Lena 138kV In Service
AD2-194 Elwood 345 kV Partially in Service - Under Construction
AE1-070 Elwood 345 kV Active
AE1-113 Mole Creek 345 kV Engineering & Procurement
AE1-114 Maryland-Lancaster 138 kV Active
AE1-134 Nelson 345 kV In Service
AE1-163 Powerton-Nevada 345 kV Engineering & Procurement
AE1-166 Loretto-Wilton & Braidwood-Davis Creek Active
AE1-172 Loretto-Wilton Center Active
AE1-205 McLean 345 kV Active
AE2-035 Lena 138 kV In Service
AE2-062 Romeoville 12 kV In Service
AE2-152 Loretto-Wilton & Braidwood-Davis Creek Active
AE2-173 McLean 345 kV Active
AE2-223 McLean 345 kV Active
AE2-255 Molecreek 345 kV Engineering & Procurement
AE2-281 Powerton-Nevada 345 kV Engineering & Procurement
AE2-321 Belvidere-Marengo 138 kV Active
AE2-341 Sandwich-Plano 138 kV Active
AF1-030 Sandwich-Plano 138 kV Active
AF1-048 Belvidere-Marengo Active
AF1-200 Plano 345 kV Active
AF1-280 Nelson-Lee County Active
AF1-296 Garden Plain 138 kV Active
AF1-314 Lena - Lancaster 138 kV Active
AF1-330 Marengo 34.5 kV Active
AF1-331 Twombley Road Active
AF2-027 Zion Energy Center 345 kV Active
AF2-031 Calumet Active
AF2-034 Kendall 345kV Active
AF2-041 Nelson-Electric Junction 345 kV Active
AF2-069 Crescent Ridge 138 kV Active
AF2-070 Crescent Ridge 138 kV Active
AF2-095 Davis Creek 138 kV Active
AF2-096 Braidwood-East Frankfort 345 kV Active
AF2-142 Nevada 345 kV Active
AF2-143 Powerton-Nevada 345 kV Active
AF2-182 Nelson-Lee County 345 kV II Active
AF2-199 Nelson-Electric Junction 345 kV Active
AF2-201 Lena - Lancaster 138 kV Active
AF2-225 McLean 345 kV Active
AF2-226 Katydid Road 345 kV Active
AF2-252 Blue Mound 345 kV Engineering & Procurement
AF2-319 Katydid Road 345 kV Active
AF2-329 Sandwich-Plano 138 kV Active
AF2-349 SILVER LAKE- CHERRY VALLEY 345 KV Active
AF2-350 Kensington 138 kV Active
AF2-352 Blue Mound 345 kV Active
AF2-359 Olive-University Park 345 kV Active
AF2-363 Cherry Valley-Glidden 138 kV Withdrawn
AF2-366 Crego Rd 138 kV Active
AF2-392 Nelson-Dixon 138 kV Active
AF2-393 Nelson-Dixon 138 kV Active
AF2-394 Nelson-Dixon 138 kV Active
AF2-441 Burnham 138kV Active
AG1-005 Corbin-Crescent Ridge 138 kV Active
AG1-044 Whiteside County In Service
AG1-118 Sugar Grove-Waterman 138kV Active
AG1-120 Glidden-Cherry Valley 138 kV Active
AG1-127 Crego Rd 138 kV Active
AG1-298 Calumet-Burnham 345 kV Active
AG1-374 Blue Mound 345 kV Active
AG1-434 Electric Junction-Nelson 345 kV Active
AG1-435 Kewanee-Hennepin 138 kV Active
AG1-436 Olive-University Park 345 kV Active
AG1-447 Olive-University Park 345 kV Active
AG1-462 Cordova 345 kV Active
AG1-478 Wilmington 34.5 kV Engineering & Procurement
AG1-512 University Park North 345 kV Active
AG1-513 Aurora 138 kV Suspended
AG1-553 Cordova 345 kV Active
X3-005 Wildwood 12kV In Service
Z1-073 Mendota Hills In Service
Z1-108 McHenry 34kV In Service
Z2-081 Streator 34.5kV In Service

Affected Systems

In Phase II of the Cycle, PJM provides the Affected System Operator any updates on the PJM projects that require an Affected Systems Study based on their response at DP1. New Service Requests that require an Affected Systems Study are required to enter into an Affected Systems Study Agreement with the Affected System Operator, as applicable, prior to the close of DP2 or they will be withdrawn from the Cycle.

If the Project Developer already entered into the necessary agreement and the results are available, PJM will supply them in the Phase II SIS report. See below for the status of any required Affected Systems Study. A status of “Pending” means that the study is not yet completed by the Affected System Operator. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Midcontinent Independent System Operator (MISO) Study Pending
New York Independent System Operator (NYISO) Not required
Tennessee Valley Authority (TVA) Not required
Louisville Gas & Electric (LG&E) Not required
Duke Energy Carolinas (DUKE) Not required
Duke Energy Progress – East (CPLE) Not required
Duke Energy Progress – West (CPLW) Not required

System Reinforcements

Based on the Phase II analysis results, this project has potential cost responsibility for the following System Reinforcements:

AF2-200 System Reinforcements Cost Breakdown:
Type TO RTEP ID / TO ID Title MW Impact Percent Allocation Allocated Cost ($USD)
Load Flow ComEd n6639.2 / CE_NUN_L15502_4 Electric Junction 345kV line reconductor, upgrade 1-34kV Circuit Breaker (CB) & associated motor operated disconnect switches, replace station conductor at both terminals. 118.1 MW 8.2% $4,244,216
Load Flow ComEd n3515.3 13.8 miles of line reconductoring plus 1 CB, station conductor, and relays at Cherry Valley 7.0 MW 12.5% $3,513,405
Load Flow ComEd n7023.1 / CE_NUN_L11124.1 Reconductor Electric Junction - Lombard L11124 345 kV Line, station condctor work and 345KV CB replacement. 32.4 MW 5.8% $1,897,818
Load Flow AEP n9182 / AEPIMJMS01 Rebuild Olive - AF2-359 345kV 12.1 MW 1.5% $318,476
Load Flow ComEd n9268 / CE_NUN_L2002.2 Reconductor, CB Replacement and Station Conductor Upgrades at Braidwood. 15.3 MW 2.4% $419,534
Load Flow AEP n5769.4 / AEPI0066a Rebuild/Recondutor 8.6 miles of ACSR ~ 954 ~ 45/7 ~ RAIL conductor to mitigate the overload 9.2 MW 1.4% $319,517
Load Flow ComEd n8414 / CE_NUN_11119.1 Electric Junction - Aurora 345 kV line - Re-conductor the line and upgrade station conductor 32.2 MW 4.0% $298,230
Load Flow ComEd n6279 / CE_NUN_116BT3-4 TSS 116 Replace 345 kV Circuit Breaker 19.4 MW 6.4% $206,241
Load Flow ComEd n9192 / CE_NUN_L11124_3 Upgrade Disconnect Switches on Electric Junction - Lombard 345 kV 32.4 MW 5.8% $175,183
Load Flow NIPS n9122 / NIPS_TC1_13323 Changeout of 2.9 miles of 2-900 ACSR overhead line 9.2 MW 1.4% $71,034
Load Flow ComEd n9130 / CE_NUN_TSS 111 BT 3-4.1 Station conductor and switch upgrades at TSS 111 Electric Junction 21.7 MW 2.8% $42,567
Load Flow ComEd n8389 / CE_N8389_116BT3-4_1 TSS 116 Replace Station Conductor 19.4 MW 6.4% $64,450
Load Flow AEP n5769.1 Perform engineering study for CT limits , and and relay compliance trip limits at Dumont substation 16.8 MW 2.2% $17,424
Load Flow AEP n9183 / AEPIMJMS02 Replace 2156 KCM ACSR 84/19 at Olive 12.1 MW 1.5% $10,282
Load Flow AEP n5913 / AEPI0042a Olive - Green Acre 345 kV Line Sag Study on the 40.64 miles of conductor. 11.3 MW 2.2% $4,744
Load Flow AEP n9184 / AEPIMJMS03 Adjust Relay Compliance Trip Limit at Olive 12.1 MW 1.5% $227
Grand Total: $11,603,348
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n6639.2 / CE_NUN_L15502_4 Electric Junction 345kV line reconductor, upgrade 1-34kV Circuit Breaker (CB) & associated motor operated disconnect switches, replace station conductor at both terminals. $52,000,000 $4,244,216 36 to 42 Months

Contributor

Description: Replace existing 345kV line conductor and possibly tower structures for approx. 27 miles, Sag mitigation on existing 345kV line conductor for up to 13 miles, Upgrade station 345kV conductor and motor operated switches, Upgrade 345kV relay scheme at one terminal substation. Tower work and cost will be identified during the Facility Study Phase.

Flowgates Addressed by this Reinforcement
Facility Contingency
ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line (Any)
ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line (All) A 1683.0 MVA
ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line (All) B 2068.0 MVA
ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line (All) C 2564.0 MVA
ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line (All) STE 2367.0 MVA
ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line (All) A 1683.0 MVA
ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line (All) B 2068.0 MVA
ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line (All) C 2564.0 MVA
ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line (All) STE 2367.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-114 44.0 MW 3.0% $1,579,372
AF1-280 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
134.4 MW 9.3% $4,829,105
AF1-296 97.8 MW 6.8% $3,516,088
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
17.2 MW 1.2% $617,698
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
159.4 MW 11.0% $5,729,688
AF2-182 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
201.6 MW 13.9% $7,243,693
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
53.1 MW 3.7% $1,909,908
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
118.1 MW 8.2% $4,244,216
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
16.1 MW 1.1% $579,822
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
109.3 MW 7.6% $3,926,042
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
32.9 MW 2.3% $1,183,720
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
22.0 MW 1.5% $789,147
AG1-434 184.5 MW 12.7% $6,629,624
AG1-462 121.4 MW 8.4% $4,362,875
AG1-553 135.2 MW 9.3% $4,859,003
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n3515.3 13.8 miles of line reconductoring plus 1 CB, station conductor, and relays at Cherry Valley $28,000,000 $3,513,405 24 to 36 Months

Contributor

Description: 13.8 miles of reconductor transmission line plus 1 CB, station conductor, and relays at Cherry Valley. The estimate provided does not include transmission tower replacement. This will be determined during the Network Upgarde Facility Study.

Flowgates Addressed by this Reinforcement
Facility Contingency
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line (Any)
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line (All) B 1726.0 MVA
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line (All) A 1334.0 MVA
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line (All) C 2084.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
7.7 MW 13.8% $3,858,062
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
10.6 MW 18.8% $5,270,107
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
3.5 MW 6.3% $1,756,702
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
7.0 MW 12.5% $3,513,405
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
10.7 MW 19.0% $5,330,958
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
4.5 MW 8.0% $2,236,030
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
7.0 MW 12.5% $3,493,952
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.1 MW 9.1% $2,540,784
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n7023.1 / CE_NUN_L11124.1 Reconductor Electric Junction - Lombard L11124 345 kV Line, station condctor work and 345KV CB replacement. $32,500,000 $1,897,818 30 to 36 Months

Contributor

Description: The upgrade will be to reconductor the line along with station conductor work at both line terminals and 2-345KV BT Circuit Breakers to be upgraded. Potential transmission tower replacement required with line reconductor. The decision about tower replacement and cost for this work will not be known until the Phase 3 system upgrade Facility Study is completed per the PJM process.Upgrade 345KV disconnect switches at both terminals.

Flowgates Addressed by this Reinforcement
Facility Contingency
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line SUM A 1461.0 MVA
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line SUM B 1656.0 MVA
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line SUM C 1913.0 MVA
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line SUM STE 1909.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
18.6 MW 3.4% $1,088,850
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
12.4 MW 2.2% $725,900
AF1-200 210.5 MW 37.9% $12,322,091
AF1-280 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
17.7 MW 3.2% $1,035,520
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
15.2 MW 2.7% $891,276
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
43.8 MW 7.9% $2,562,075
AF2-182 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
26.5 MW 4.8% $1,553,250
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
14.6 MW 2.6% $854,045
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
32.4 MW 5.8% $1,897,818
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
14.3 MW 2.6% $836,600
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
5.2 MW 0.9% $306,341
AF2-349 18.2 MW 3.3% $1,063,970
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
17.5 MW 3.2% $1,026,036
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.3 MW 1.0% $309,327
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
3.5 MW 0.6% $206,238
AG1-118 38.1 MW 6.9% $2,231,732
AG1-434 25.4 MW 4.6% $1,484,290
AG1-462 17.0 MW 3.1% $995,712
AG1-553 18.9 MW 3.4% $1,108,929
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP n9182 / AEPIMJMS01 Rebuild Olive - AF2-359 345kV $35,000,000 $318,476 30 to 36 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Rebuild the ~7.3 mile 345 kV line section between Olive and AF2-359 POI. The standard conductor for 345kV lines is 2-bundle 954 ACSR 45/7 RAIL.

Flowgates Addressed by this Reinforcement
Facility Contingency
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line SUM A 1025.0 MVA
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line SUM B 1318.0 MVA
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line WIN A 1298.0 MVA
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line WIN B 1370.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-070 15.1 MW 1.8% $398,584
AE1-114 11.2 MW 1.4% $296,804
AE1-172 19.5 MW 2.4% $516,433
AE2-321 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
10.3 MW 1.2% $273,414
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
16.2 MW 1.9% $427,868
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
10.8 MW 1.3% $285,254
AF1-048 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
5.4 MW 0.6% $142,720
AF1-200 215.6 MW 25.9% $5,698,473
AF1-296 14.4 MW 1.7% $381,114
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
16.1 MW 1.9% $424,987
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
18.1 MW 2.2% $477,688
AF2-095 17.9 MW 2.1% $472,032
AF2-096 34.1 MW 4.1% $900,269
AF2-142 17.1 MW 2.1% $452,659
AF2-143 16.3 MW 2.0% $431,885
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
6.0 MW 0.7% $159,238
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
12.1 MW 1.5% $318,476
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
2.6 MW 0.3% $68,188
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
4.6 MW 0.5% $120,360
AF2-349 30.7 MW 3.7% $811,308
AF2-350 11.2 MW 1.3% $295,033
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
14.5 MW 1.7% $382,964
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.5 MW 0.7% $144,305
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
3.6 MW 0.4% $96,204
AF2-441 17.3 MW 2.1% $456,438
AG1-005 11.0 MW 1.3% $291,359
AG1-118 31.4 MW 3.8% $828,645
AG1-120 12.2 MW 1.5% $322,018
AG1-127 9.9 MW 1.2% $261,494
AG1-298 43.4 MW 5.2% $1,148,099
AG1-434 13.3 MW 1.6% $351,513
AG1-435 10.4 MW 1.3% $276,189
AG1-436 Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-436, AG1-447
106.6 MW 12.8% $2,816,860
AG1-447 Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-436, AG1-447
46.7 MW 5.6% $1,233,202
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n9268 / CE_NUN_L2002.2 Reconductor, CB Replacement and Station Conductor Upgrades at Braidwood. $17,700,000 $419,534 24 to 30 Months

Contributor

Description: The scope of work will be to re-conductor approx.. 5.8 miles of 345Kv line, replace 2-345Kv Circuit Breakers at Station 20 Braidwood along with station conductor upgrade at Station 20. Upon comopetion of this work the SST E rating will be 2293 MVA (SUMMER) .

Flowgates Addressed by this Reinforcement
Facility Contingency
BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line (All) STE 2293.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
16.3 MW 2.5% $446,025
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
10.9 MW 1.7% $297,350
AF1-200 335.2 MW 51.9% $9,182,320
AF1-280 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
13.1 MW 2.0% $358,250
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
14.8 MW 2.3% $405,781
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
20.7 MW 3.2% $566,373
AF2-096 106.9 MW 16.5% $2,927,750
AF2-182 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
19.6 MW 3.0% $537,361
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
6.9 MW 1.1% $188,782
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
15.3 MW 2.4% $419,534
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
13.9 MW 2.2% $380,906
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
4.6 MW 0.7% $125,471
AF2-349 22.5 MW 3.5% $615,192
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
12.7 MW 2.0% $347,155
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
3.8 MW 0.6% $104,678
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
2.5 MW 0.4% $69,776
AG1-118 26.5 MW 4.1% $727,294
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP n5769.4 / AEPI0066a Rebuild/Recondutor 8.6 miles of ACSR ~ 954 ~ 45/7 ~ RAIL conductor to mitigate the overload $22,360,000 $319,517 24 to 36 Months

Contributor

Description: The existing 2-954 45/7 (Rail) ACSR has SN/SE ratings of 1409/1888 MVA if no clearance issues are identified. This conductor is the maximum the present structure class was intended to carry. It may be possible to install larger or higher-tensioned conductor without rebuilding the entire line, but detailed mechanical loading analysis will be required to determine if (or how many of) the existing structures could be re-used. Cost estimate is $22.3 M assuming a complete wreck and rebuild of the AEP owned portion of the line. Using 2-954 ACSS, the new conductor rating will be 2650 MVA for both SN and SE. New overall AEP end line ratings after upgrade: S/N: 1740 MVA S/E: 2034 MVA. PJM Network Upgrade N5769.4.

Flowgates Addressed by this Reinforcement
Facility Contingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 1740.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 2034.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-070 12.0 MW 1.9% $416,773
AE1-172 27.8 MW 4.3% $961,838
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
8.0 MW 1.2% $276,823
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
5.3 MW 0.8% $184,099
AF1-200 280.0 MW 43.3% $9,688,961
AF1-296 20.3 MW 3.1% $701,657
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
22.5 MW 3.5% $777,774
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
13.9 MW 2.1% $479,258
AF2-096 16.3 MW 2.5% $562,848
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
4.6 MW 0.7% $159,741
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
9.2 MW 1.4% $319,517
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
3.6 MW 0.6% $124,901
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
3.4 MW 0.5% $116,113
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
20.3 MW 3.1% $702,349
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
7.7 MW 1.2% $264,678
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.1 MW 0.8% $176,452
AF2-441 35.2 MW 5.4% $1,217,867
AG1-118 14.2 MW 2.2% $491,852
AG1-298 88.2 MW 13.6% $3,050,549
AG1-374 11.2 MW 1.7% $389,164
AG1-434 18.6 MW 2.9% $643,878
AG1-462 18.9 MW 2.9% $652,908
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n8414 / CE_NUN_11119.1 Electric Junction - Aurora 345 kV line - Re-conductor the line and upgrade station conductor $7,500,000 $298,230 30 to 36 Months

Contributor

Description: Re-conductor the line, upgrade station conductor at TSS 111 Electric Junction, upgrade 345KV L11119 circuit breaker TSS 111 - 345KV disconnect switches. The potential for tower replacement for the reconductoring is possible. This will not be identified until the Network Upgrade Facility Study is performed. If tower replacement is required, the estimate and timeline will be amended.

Flowgates Addressed by this Reinforcement
Facility Contingency
ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line (All) A 1334.0 MVA
ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line (All) B 1726.0 MVA
ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line (All) C 2084.0 MVA
ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line (All) STE 1837.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-114 27.4 MW 3.4% $253,689
AE2-321 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
24.9 MW 3.1% $230,900
AF1-048 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
13.0 MW 1.6% $120,536
AF1-200 187.7 MW 23.2% $1,737,721
AF1-280 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
36.4 MW 4.5% $336,977
AF1-296 28.2 MW 3.5% $260,955
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
42.8 MW 5.3% $395,996
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
43.5 MW 5.4% $402,614
AF2-182 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
54.6 MW 6.7% $505,471
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
14.5 MW 1.8% $134,208
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
32.2 MW 4.0% $298,230
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
40.2 MW 5.0% $371,716
AF2-349 73.6 MW 9.1% $681,702
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
30.9 MW 3.8% $286,104
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
9.3 MW 1.2% $86,260
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
6.2 MW 0.8% $57,510
AG1-118 28.3 MW 3.5% $261,982
AG1-120 17.9 MW 2.2% $165,670
AG1-434 28.2 MW 3.5% $261,149
AG1-462 33.3 MW 4.1% $307,801
AG1-553 37.0 MW 4.6% $342,809
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n6279 / CE_NUN_116BT3-4 TSS 116 Replace 345 kV Circuit Breaker $3,200,000 $206,241 24 Months

Contributor

Description: The upgrade will be to replace the 345kV BT3-4 circuit breaker at TSS 116. A preliminary estimate for the upgrade is $3.2M. A preliminary construction timeline id 24 months. Upon completion of the upgrade the ratings will be 1754/2246/2297/2488 MVA (SN/SLTE/SSTE/SLD.

Flowgates Addressed by this Reinforcement
Facility Contingency
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (All) A 1754.0 MVA
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (All) B 2246.0 MVA
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (All) C 2488.0 MVA
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (All) STE 2297.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-070 26.0 MW 8.6% $276,591
AF1-280 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
19.0 MW 6.3% $201,718
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
20.3 MW 6.8% $216,478
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
26.2 MW 8.7% $278,432
AF2-182 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
28.4 MW 9.5% $302,577
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
8.7 MW 2.9% $92,814
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
19.4 MW 6.4% $206,241
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
19.1 MW 6.3% $203,197
AF2-349 29.6 MW 9.9% $315,347
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
18.7 MW 6.2% $198,579
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.6 MW 1.9% $59,879
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
3.8 MW 1.2% $39,916
AG1-118 26.9 MW 8.9% $286,061
AG1-462 23.2 MW 7.7% $247,040
AG1-553 25.9 MW 8.6% $275,133
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n9192 / CE_NUN_L11124_3 Upgrade Disconnect Switches on Electric Junction - Lombard 345 kV $3,000,000 $175,183 24 Months

Contributor

Description: Upgrade 345Kv motor operated disconnect switches at both line terminals. Upon completion the limit ratings will be 1560/1802/2083/2477 MVA (SN/ALTE/SSTE/SLD).

Flowgates Addressed by this Reinforcement
Facility Contingency
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line (All) A 1560.0 MVA
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line (All) B 1802.0 MVA
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line (All) C 2477.0 MVA
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line (All) STE 2083.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
18.6 MW 3.4% $100,509
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
12.4 MW 2.2% $67,006
AF1-200 210.5 MW 37.9% $1,137,424
AF1-280 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
17.7 MW 3.2% $95,586
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
15.2 MW 2.7% $82,272
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
43.8 MW 7.9% $236,499
AF2-182 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
26.5 MW 4.8% $143,377
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
14.6 MW 2.6% $78,835
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
32.4 MW 5.8% $175,183
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
14.3 MW 2.6% $77,225
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
5.2 MW 0.9% $28,278
AF2-349 18.2 MW 3.3% $98,213
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
17.5 MW 3.2% $94,711
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.3 MW 1.0% $28,553
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
3.5 MW 0.6% $19,037
AG1-118 38.1 MW 6.9% $206,006
AG1-434 25.4 MW 4.6% $137,011
AG1-462 17.0 MW 3.1% $91,912
AG1-553 18.9 MW 3.4% $102,363
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow NIPS n9122 / NIPS_TC1_13323 Changeout of 2.9 miles of 2-900 ACSR overhead line $4,971,000 $71,034 TBD

Contributor

Description: Changeout of 2.9 miles of 2-900 ACSR overhead line. Rating: SN/SE: 2133/2390

Flowgates Addressed by this Reinforcement
Facility Contingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 2133.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 2390.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 2174.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 2390.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-070 12.0 MW 1.9% $92,656
AE1-172 27.8 MW 4.3% $213,833
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
8.0 MW 1.2% $61,542
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
5.3 MW 0.8% $40,928
AF1-200 280.0 MW 43.3% $2,154,017
AF1-296 20.3 MW 3.1% $155,990
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
22.5 MW 3.5% $172,912
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
13.9 MW 2.1% $106,547
AF2-096 16.3 MW 2.5% $125,131
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
4.6 MW 0.7% $35,513
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
9.2 MW 1.4% $71,034
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
3.6 MW 0.6% $27,767
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
3.4 MW 0.5% $25,814
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
20.3 MW 3.1% $156,144
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
7.7 MW 1.2% $58,842
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.1 MW 0.8% $39,228
AF2-441 35.2 MW 5.4% $270,752
AG1-118 14.2 MW 2.2% $109,347
AG1-298 88.2 MW 13.6% $678,188
AG1-374 11.2 MW 1.7% $86,518
AG1-434 18.6 MW 2.9% $143,145
AG1-462 18.9 MW 2.9% $145,152
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n9130 / CE_NUN_TSS 111 BT 3-4.1 Station conductor and switch upgrades at TSS 111 Electric Junction $2,400,000 $42,567 24 to 28 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Upgrade station conductor 345KV bus 3 & bus4 at TSS 111 Electric Junction.

Flowgates Addressed by this Reinforcement
Facility Contingency
ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line SUM A 1560.0 MVA
ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line SUM B 1802.0 MVA
ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line SUM C 2477.0 MVA
ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line SUM STE 2083.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-321 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
15.9 MW 2.1% $31,120
AF1-048 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
8.3 MW 1.1% $16,245
AF1-200 383.0 MW 49.8% $750,009
AF1-280 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
24.2 MW 3.2% $47,467
AF1-296 19.4 MW 2.5% $38,035
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
27.7 MW 3.6% $54,278
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
29.3 MW 3.8% $57,466
AF2-182 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
36.4 MW 4.7% $71,200
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
9.8 MW 1.3% $19,155
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
21.7 MW 2.8% $42,567
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
26.0 MW 3.4% $50,951
AF2-349 46.5 MW 6.0% $91,103
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
21.0 MW 2.7% $41,047
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
6.3 MW 0.8% $12,377
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
4.2 MW 0.5% $8,251
AG1-118 21.4 MW 2.8% $41,987
AG1-434 19.0 MW 2.5% $37,277
AG1-462 23.1 MW 3.0% $45,152
AG1-553 25.7 MW 3.3% $50,287
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n8389 / CE_N8389_116BT3-4_1 TSS 116 Replace Station Conductor $1,000,000 $64,450 24 Months

Contributor

Description: PJM Network Project- N8389.ComEd 345kV BT3-4 at TSS 116 SSTE rating is 2083 MVA. The upgrade will be to replace the station conductor at TSS 116. A preliminary estimate for the upgrade is $1M. A preliminary construction timeline is 24 months. Upon completion of the upgrade the ratings will be 2236/2874/3009/3358 MVA (SN/SLTE/SSTE/SLD.

Flowgates Addressed by this Reinforcement
Facility Contingency
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (All) A 2236.0 MVA
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (All) B 2874.0 MVA
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (All) C 3358.0 MVA
GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line (All) STE 3009.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-070 26.0 MW 8.6% $86,435
AF1-280 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
19.0 MW 6.3% $63,037
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
20.3 MW 6.8% $67,649
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
26.2 MW 8.7% $87,010
AF2-182 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
28.4 MW 9.5% $94,555
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
8.7 MW 2.9% $29,004
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
19.4 MW 6.4% $64,450
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
19.1 MW 6.3% $63,499
AF2-349 29.6 MW 9.9% $98,546
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
18.7 MW 6.2% $62,056
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.6 MW 1.9% $18,712
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
3.8 MW 1.2% $12,474
AG1-118 26.9 MW 8.9% $89,394
AG1-462 23.2 MW 7.7% $77,200
AG1-553 25.9 MW 8.6% $85,979
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP n5769.1 Perform engineering study for CT limits , and and relay compliance trip limits at Dumont substation $780,000 $17,424 12 to 18 Months

Contributor

Description: An Engineering study will need to be conducted to determine if the Dumont CT Thermal Limit settings can be adjusted to mitigate the overload. New relay package will be required if the settings cannot be adjusted, Estimated Cost: $600,000. New AEP ratings: 1409/1868 MVA SN/SE.

Flowgates Addressed by this Reinforcement
Facility Contingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 1409.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 1779.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-070 20.8 MW 2.8% $21,606
AE1-172 27.8 MW 3.7% $28,892
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
15.0 MW 2.0% $15,625
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
10.0 MW 1.3% $10,391
AF1-200 300.0 MW 40.0% $311,822
AF1-296 20.3 MW 2.7% $21,076
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
22.5 MW 3.0% $23,363
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
25.1 MW 3.4% $26,137
AF2-096 28.0 MW 3.7% $29,087
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
8.4 MW 1.1% $8,712
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
16.8 MW 2.2% $17,424
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
3.6 MW 0.5% $3,752
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
6.3 MW 0.8% $6,555
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
20.3 MW 2.7% $21,097
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
7.7 MW 1.0% $7,950
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.1 MW 0.7% $5,300
AF2-441 36.9 MW 4.9% $38,380
AG1-118 26.1 MW 3.5% $27,105
AG1-298 92.5 MW 12.3% $96,080
AG1-374 19.9 MW 2.7% $20,693
AG1-434 18.6 MW 2.5% $19,341
AG1-462 18.9 MW 2.5% $19,612
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP n9183 / AEPIMJMS02 Replace 2156 KCM ACSR 84/19 at Olive $1,130,000 $10,282 18 to 24 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Replace five (5) instances of 2156 KCM ACSR 84/19 station conductor at Olive

Flowgates Addressed by this Reinforcement
Facility Contingency
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line (All) B 1370.0 MVA
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line SUM A 1188.0 MVA
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line WIN A 1370.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-070 15.1 MW 1.8% $12,869
AE1-114 11.2 MW 1.4% $9,583
AE1-172 19.5 MW 2.4% $16,673
AE2-321 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
10.3 MW 1.2% $8,827
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
16.2 MW 1.9% $13,814
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
10.8 MW 1.3% $9,210
AF1-048 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
5.4 MW 0.6% $4,608
AF1-200 215.6 MW 25.9% $183,979
AF1-296 14.4 MW 1.7% $12,305
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
16.1 MW 1.9% $13,721
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
18.1 MW 2.2% $15,422
AF2-095 17.9 MW 2.1% $15,240
AF2-096 34.1 MW 4.1% $29,066
AF2-142 17.1 MW 2.1% $14,614
AF2-143 16.3 MW 2.0% $13,944
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
6.0 MW 0.7% $5,141
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
12.1 MW 1.5% $10,282
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
2.6 MW 0.3% $2,202
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
4.6 MW 0.5% $3,886
AF2-349 30.7 MW 3.7% $26,194
AF2-350 11.2 MW 1.3% $9,525
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
14.5 MW 1.7% $12,364
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.5 MW 0.7% $4,659
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
3.6 MW 0.4% $3,106
AF2-441 17.3 MW 2.1% $14,736
AG1-005 11.0 MW 1.3% $9,407
AG1-118 31.4 MW 3.8% $26,753
AG1-120 12.2 MW 1.5% $10,397
AG1-127 9.9 MW 1.2% $8,443
AG1-298 43.4 MW 5.2% $37,067
AG1-434 13.3 MW 1.6% $11,349
AG1-435 10.4 MW 1.3% $8,917
AG1-436 Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-436, AG1-447
106.6 MW 12.8% $90,944
AG1-447 Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-436, AG1-447
46.7 MW 5.6% $39,815
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP n5913 / AEPI0042a Olive - Green Acre 345 kV Line Sag Study on the 40.64 miles of conductor. $211,328 $4,744 24 to 36 Months

Contributor

Description: A Sag Study will be required on the 40.64 miles of conductor to mitigate the overload. Depending on the sag study results, the cost for this upgrade is expected to be between $162,560 (no remediation required, just sag study) and $81.28 million (complete line Reconductor/rebuild). Time Estimate: a) Sag Study: 6-12 months b) Rebuild: The standard time required for construction differs from state to state. An approximate construction time would be 24 to 36 months after signing an interconnection agreement. Conductor will be operated at MOT.

Flowgates Addressed by this Reinforcement
Facility Contingency
05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line (All) A 971.0 MVA
05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line (All) B 1413.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-070 14.1 MW 2.8% $5,925
AE1-114 10.6 MW 2.1% $4,438
AE1-172 18.5 MW 3.7% $7,761
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
10.2 MW 2.0% $4,267
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
6.8 MW 1.3% $2,838
AF1-200 203.1 MW 40.3% $85,119
AF1-296 13.6 MW 2.7% $5,699
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
15.2 MW 3.0% $6,353
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
17.0 MW 3.4% $7,117
AF2-095 10.3 MW 2.0% $4,296
AF2-096 19.2 MW 3.8% $8,041
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
5.7 MW 1.1% $2,372
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
11.3 MW 2.2% $4,744
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
2.4 MW 0.5% $1,018
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
4.3 MW 0.8% $1,790
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
13.7 MW 2.7% $5,724
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.2 MW 1.0% $2,158
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
3.4 MW 0.7% $1,437
AF2-441 19.4 MW 3.8% $8,121
AG1-005 10.4 MW 2.1% $4,340
AG1-118 17.6 MW 3.5% $7,394
AG1-298 50.1 MW 9.9% $20,998
AG1-434 12.5 MW 2.5% $5,255
AG1-435 9.8 MW 2.0% $4,123
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP n9184 / AEPIMJMS03 Adjust Relay Compliance Trip Limit at Olive $25,000 $227 18 to 24 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Description: Adjust Relay Compliance Trip Limit at Olive

Flowgates Addressed by this Reinforcement
Facility Contingency
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line SUM A 1188.0 MVA
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line SUM B 1539.0 MVA
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line WIN A 1506.0 MVA
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line WIN B 1777.0 MVA
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-070 15.1 MW 1.8% $285
AE1-114 11.2 MW 1.4% $212
AE1-172 19.5 MW 2.4% $369
AE2-321 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
10.3 MW 1.2% $195
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
16.2 MW 1.9% $306
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
10.8 MW 1.3% $204
AF1-048 Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-321, AF1-048
5.4 MW 0.6% $102
AF1-200 215.6 MW 25.9% $4,070
AF1-296 14.4 MW 1.7% $272
AF1-314 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
16.1 MW 1.9% $304
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
18.1 MW 2.2% $341
AF2-095 17.9 MW 2.1% $337
AF2-096 34.1 MW 4.1% $643
AF2-142 17.1 MW 2.1% $323
AF2-143 16.3 MW 2.0% $308
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
6.0 MW 0.7% $114
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200
12.1 MW 1.5% $227
AF2-201 Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-314, AF2-201
2.6 MW 0.3% $49
AF2-329 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
4.6 MW 0.5% $86
AF2-349 30.7 MW 3.7% $580
AF2-350 11.2 MW 1.3% $211
AF2-392 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
14.5 MW 1.7% $274
AF2-393 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
5.5 MW 0.7% $103
AF2-394 Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-392, AF2-393, AF2-394
3.6 MW 0.4% $69
AF2-441 17.3 MW 2.1% $326
AG1-005 11.0 MW 1.3% $208
AG1-118 31.4 MW 3.8% $592
AG1-120 12.2 MW 1.5% $230
AG1-127 9.9 MW 1.2% $187
AG1-298 43.4 MW 5.2% $820
AG1-434 13.3 MW 1.6% $251
AG1-435 10.4 MW 1.3% $197
AG1-436 Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-436, AG1-447
106.6 MW 12.8% $2,012
AG1-447 Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-436, AG1-447
46.7 MW 5.6% $881
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP b3775.7 / b3775.7b Upgrade breakers at Dumont substation on the Stillwell-Dumont 345 kV line. $0 $0 Dec 01 2026

Not Contingent

Note: AF2-200 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-200 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Description: Upgrade the limiting element at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating. This includes replacement of breakers F and F1.

Flowgates Addressed by this Reinforcement
Facility Contingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 1408.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 1887.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 1408.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 1887.0 MVA
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP b3775.11 / b3775.7a Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating. $0 $0 Dec 01 2026

Not Contingent

Note: AF2-200 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-200 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Description: Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating.

Flowgates Addressed by this Reinforcement
Facility Contingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 1409.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 1737.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 1409.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 1737.0 MVA
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP b3775.6 Perform sag study mitigation work on the Dumont-Stillwell 345 kV line $0 $0 Mar 04 2027

Not Contingent

Note: AF2-200 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-200 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Description: Perform sag study mitigation work on the Dumont-Stillwell 345 kV line (remove a center-pivot irrigation system from under the line, allowing for the normal and emergency ratings of the line to increase, replace two structures and modify a third structure).

Flowgates Addressed by this Reinforcement
Facility Contingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 1409.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 1718.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) A 1409.0 MVA
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (All) B 1718.0 MVA
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd b3775.1 Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line $0 $0 Dec 01 2026

Contingent

Note: Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 may need this upgrade in-service to be deliverable to the PJM system. If AF2-200 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Description: Outside of the Green Acres substation, swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line to the University Park N-Olive 345 kV line to create a University Park N-Green Acres-Olive and St. John-Olive 345 kV lines.

Flowgates Addressed by this Reinforcement
Facility Contingency
17GREEN_ACRE-ST JOHN ; T 345.0 kV Ckt 1 line (Any)
17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line (Any)
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line (Any)
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line (All) A 9999.0 MVA
17GREEN_ACRE-ST JOHN ; T 345.0 kV Ckt 1 line (All) A 9999.0 MVA
17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line (All) B 9999.0 MVA
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line (All) ALDR 9999.0 MVA
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line (All) STE 9999.0 MVA
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (All) B 9999.0 MVA
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (All) A 9999.0 MVA
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (All) ALDR 9999.0 MVA
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (All) STE 9999.0 MVA
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line (All) A 9999.0 MVA
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (All) A 9999.0 MVA
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow NextEra s2509 / (Pending) Rebuild the L97008: Univ. Park S/S-Olive S/S 345 kV $0 $0 Dec 31 2023

Contingent

Note: Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 may need this upgrade in-service to be deliverable to the PJM system. If AF2-200 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Description: Rebuild the (L97008: Univ. Park S/S-Olive S/S 345 kV) of the ~20 mile double-circuit line withmonopoles and new conductor utilizing existing ROW ( Univ. Park S/S-Olive S/S 345 kV) .

Flowgates Addressed by this Reinforcement
Facility Contingency
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (All) B 2495.0 MVA
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (All) B 2495.0 MVA
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow AEP b3775.10 Sag study on the Olive – University Park $0 $0 Dec 01 2026

Contingent

Note: Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 may need this upgrade in-service to be deliverable to the PJM system. If AF2-200 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Description: Perform a sag study on the Olive – University Park 345kV line to increase the operating temperature to 225 F. Remediation work includes two tower replacements on the line.

Flowgates Addressed by this Reinforcement
Facility Contingency
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (All) A 1679.0 MVA
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (All) B 2058.0 MVA
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (All) A 1679.0 MVA
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (All) B 2058.0 MVA
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (All) A 1679.0 MVA
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (All) B 2058.0 MVA
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd b3775.5 Replace E. Frankfort 345 kV circuit breaker “9-14” with 3150A SF6 circuit breaker. $0 $0 Dec 01 2026

Not Contingent

Note: AF2-200 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-200 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Description: Part of b3775 baseline. Replace E. Frankfort 345 kV circuit breaker “9-14” with 3150A SF6 circuit breaker.

Flowgates Addressed by this Reinforcement
Facility Contingency
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (All) A 1826.0 MVA
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (All) B 2070.0 MVA
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (All) C 2390.0 MVA
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line SUM STE 2385.0 MVA
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd b3775.4 / CE_B3775.4 Rebuild 345 kV double circuit extending from Crete to E. Frankfort. $0 $0 Dec 01 2026

Contingent

Note: Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 may need this upgrade in-service to be deliverable to the PJM system. If AF2-200 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Description: Part of b3775 baseline. Rebuild 12.7 miles of 345 kV double circuit extending from Crete to E. Frankfort with twin bundled 1277 ACAR conductor.

Flowgates Addressed by this Reinforcement
Facility Contingency
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (Any)
(Any) 765-L11215__-S_SRT-A
New Ratings
Facility Rating Set Rating Type Rating Value
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (All) A 1679.0 MVA
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (All) B 2058.0 MVA
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (All) C 2280.0 MVA
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (All) STE 2017.0 MVA
System Reinforcement
Type TO RTEP ID / TO ID Title Total Cost ($USD) Allocated Cost ($USD) Time Estimate
Load Flow ComEd n5318.1 / ce-012a Garden Prarie - Silver Lake R 345 kV Line - Reconductor and Station Bus Work $57,000,000 $0 30 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AF2-200 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AF2-200 could receive cost allocation. Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 is a potential Aggregate Pool Contributor.

Description: The upgrade will be to re-conductor the line and station bus work. Potential transmission tower replacement required with line reconductor. The estimate for this work will not be known until the Phase 3 system upgrade Facility Study is completed per the PJM process.

Flowgates Addressed by this Reinforcement
Facility Contingency
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line (Any)
SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line (Any)
New Ratings
Facility Rating Set Rating Type Rating Value
SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line (All) A 1334.0 MVA
SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line (All) B 1726.0 MVA
SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line (All) C 2084.0 MVA
SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line (All) STE 1867.0 MVA

Attachments


[1]Winter load flow analysis will be performed starting in Transition Cycle #2.