AF2-200 Phase II Study Report
v1.00 released 2024-12-18 13:43
Nelson-Electric Junction 345 kV
120.0 MW Capacity / 200.0 MW Energy
Introduction
This Phase II System Impact Study Report (PH2) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 310 for New Service Requests (projects) in Transition Cycle #1. The Project Developer/Eligible Customer (developer) is Steward Creek Solar, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Commonwealth Edison Company.
Preface
The Phase II System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase II System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.
In accordance with PJM Manual 14H, section 4.5, PJM takes the following actions during the Phase II System Impact Study:
- PJM will retool load flow results from Phase I System Impact Study (summer peak, winter peak[1] and light load) based on decisions made by Project Developers or Eligible Customers during Decision Point I.
- PJM will conduct any required voltage analyses.
- PJM will perform short circuit and stability analyses as required.
- PJM will coordinate with the Affected System to confirm which projects in PJM Cycle will require Affected System studies. If the Affected System Operator indicates that an Affected System study is required, PJM will:
- Notify the Project Developer or Eligible Customer of the need for an Affected System study and the requirement to execute an Affected System study agreement with the impacted Affected System Operator, and;
- Include the results of the Affected System Operator’s Affected System Study in the Phase II System Impact Study results, if applicable and available
- The Phase II System Impact Study Results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase II System Impact Study:
- Verify Interconnection Facilities and Network Upgrades required to accommodate the New Service Request.
- Perform a Facilities Study. The Facilities Study in Phase II System Impact Study phase will be for the physical Interconnection Facilities. The Facilities Study requirements are outlined in Attachment C of PJM Manual 14H. The study will be conducted pursuant to Tariff, Part VII, Subpart D, section 307(A)(7).
Decision Point II Requirements
At the close of Phase II System Impact Study, PJM will initiate Decision Point II (DP2). During DP2, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.A. Additional information on these elements is available in PJM Manual 14H sections 4.6, 6, and 7.
Allowable project modifications at Decision Point II are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.
Adverse Test Eligibility
This New Service Request does not meet the Adverse Study Impact Criteria and has the option to either move forward in the Cycle process or withdraw at DP2 with Readiness Deposit #1 forfeited. See adverse study impact calculation below.
This section details whether a Project Developer or Eligible Customer qualifies for the Adverse Study Impact clause outlined in the PJM OATT, Part VII, Subpart D, section 311.B and Manual 14H, section 6.2.2. In order to qualify for an Adverse Study Impact at Decision Point II, the Network Upgrade cost from Phase I to Phase II must:
- Increase overall by 25% or more
- Increases by more than $10,000 per MW (Includes Costs identified in Affected System studies)
If a New Service Request meets the criteria above and chooses to withdraw the request, PJM will refund the cumulative Readiness Deposit amounts paid at the Application Phase and at Decision Point I (RD1 and RD2, respectively).
The below calculations show the computation of this New Service Request's Adverse Study Impact
General
The Project Developer has proposed an uprate to a planned/existing Solar facility located in the Commonwealth Edison Company zone — Lee County, Illinois. This project is an increase to the developer’s AF2-041/AF2-199 project(s), which will share the same Point of Interconnection. The AF2-200 project is a 200.0 MW uprate (120.0 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 600.0 MW with 360.0 MW of this output being recognized by PJM as Capacity.
| Project Information | |
|---|---|
| New Service Request Number | AF2-200 |
| Project Name | Nelson-Electric Junction 345 kV |
| Project Developer Name | Steward Creek Solar, LLC |
| State | Illinois |
| County | Lee |
| Transmission Owner | Commonwealth Edison Company |
| MFO | 600.0 MW |
| MWE | 200.0 MW |
| MWC | 120.0 MW |
| Fuel Type | Solar |
| Basecase Study Year | 2027 |
Physical Interconnection Facility Study
The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.
Point of Interconnection
AF2-200 will interconnect with the ComEd transmission system as an uprate to AF2-041 via a newly constructed 345kV breaker and a half substation, TSS 934 Herman Road, tapping the TSS 155 Nelson – TSS 111 Electric Junction 345kV line, L.15502, approximately 32.5 miles from TSS 155 Nelson and 40.6 miles from TSS 111 Electric Junction.
Cost Summary
The table below shows a summary of the total cost estimates for this New Service Request project. In Phase II SIS, the interconnected Transmission Owner has performed a facilities study for both the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades. The System Reliability Network Upgrade shown in the table are planning level cost estimates which are subject to change as a result of a facility study performed by the TO during Phase III System Impact Study.
Based on the Phase II SIS results, the AF2-200 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit #3 are also shown below.
| Cost Summary | |||
|---|---|---|---|
| Description | Cost Allocated to AF2-200 | Cost Subject to Readiness* | |
| Transmission Owner Interconnection Facilities (TOIF) | $503,569 | $0 | |
| Other Scope | $0 | $0 | |
| Physical Interconnection Network Upgrades | |||
| Stand Alone Network Upgrades | $12,754,832 | $12,754,832 | |
| Network Upgrades | $5,069,205 | $5,069,205 | |
| System Reliability Network Upgrades | |||
| Steady State Thermal & Voltage (SP & LL) | $11,603,349 | $11,603,349 | |
| Transient Stability | $0 | $0 | |
| Short Circuit | $0 | $0 | |
| Transmission Owner Analysis | |||
| SubRegional | $0 | $0 | |
| Distribution | $0 | $0 | |
| Affected System Study Reinforcements | $0 | $0 | |
| Total | $29,930,956 | $29,427,387 | |
* Contributes to calculation for Readiness Deposit #3 (RD3). See Readiness Deposit section of report for additional detail.
Definitions
Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.
Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.
Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.
Notes
Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.
Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.
Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.
Note 4: Please see the ‘Affected Systems Studies’ section of this Phase 2 SIS report for details on your project’s need for an Affected Systems Study. If your project requires an Affected Systems Study, the Affected Systems impacts may not be available from the Affected System Operator at the time of the PJM Phase II SIS. Therefore, the cost in this section would not reflect any required upgrades by the Affected System until the study is completed. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.
Readiness Deposit
Per Tariff Part VII, Subpart D, section 311 (Decision Point II) A.1.b and PJM Manual 14H, section 6.2, Readiness Deposit #3 (RD3) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.
During Decision Point II (DP2), the Project Developer or Eligible Customer is required to submit Readiness Deposit #3, which is calculated as 20% of cost allocation for required Phase II Network Upgrades minus Readiness Deposit #1 & Readiness Deposit #2.
Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.
Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))
Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.
Note 4: Readiness Deposit #3 can be zero, but may not be a negative number.
Readiness Deposit #3 Due for Project AF2-200
Readiness Deposit #3 has been calculated for the AF2-200 project based on the Phase II System Impact Study results and is shown in the table below. This Readiness Deposit #3 must be provided at Decision Point II through either a wire transfer or letter of credit per Manual 14H, Section 6.2.
| Readiness Deposit | |||
|---|---|---|---|
| Project ID | 20% of cost allocation for Phase II Network Upgrades | Sum of Readiness Deposit #1 & Readiness Deposit #2 Received (RD1+RD2) | Readiness Deposit #3 (RD3) for AF2-200 Project due at DP2 |
| A | B | A - B | |
| AF2-200 | $5,885,477 | $4,497,775 | $1,387,702 |
Note: Failure to provide an acceptable form of Readiness Deposit #3 by the end of Decision Point II will result in withdrawal and termination of the New Service Request.
For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.
Transmission Owner Scope of Work
As shown in the one line diagram, this Interconnection Request is sharing the Point of Interconnection (POI) with one or more other Interconnection Requests. Should other requests withdraw from Transition Cycle 1, the cost allocation for Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and applicable Network Upgrades identified in the study report will be updated for the remaining project(s). Refer to the one line for other Interconnection Requests at this POI.
The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.
Transmission Owner Build Option
| Network Upgrades | |||||||
|---|---|---|---|---|---|---|---|
| RTEP ID | Description | Direct | Indirect | Total Cost ($USD) | Allocated Cost ($USD) | ||
| Labor | Materials | Labor | Materials | ||||
| (Pending) |
Distribution Aux Power (3 miles) |
$1,237,965 | $741,069 | $159,305 | $43,872 | $2,182,211 | $727,404 (See Note 1) |
| (Pending) |
Fiber Installation |
$2,834,536 | $1,432,732 | $364,757 | $84,820 | $4,716,845 | $1,572,282 (See Note 1) |
| (Pending) |
4 Remote Ends - ICON Nodes at STA 6 Byron, TSS 144 Wayne, TSS 937 Lee County and TSS 113 Waterman |
$265,891 | $48,746 | $89,871 | $2,906 | $407,414 | $135,805 (See Note 1) |
| (Pending) |
TSS155 Electric Junction - Remote End Relay Upgrades |
$531,071 | $122,825 | $68,340 | $7,271 | $729,507 | $243,169 (See Note 1) |
| (Pending) |
TSS120 Electric Junction - Remote End Relay Upgrades |
$216,488 | $12,351 | $27,858 | $731 | $257,428 | $85,809 (See Note 1) |
| (Pending) |
TSS111 Electric Junction - Remote End Relay Upgrades |
$531,071 | $122,825 | $68,340 | $7,271 | $729,507 | $243,169 (See Note 1) |
| (Pending) |
L91609 Cut-in |
$3,818,675 | $1,769,851 | $491,400 | $104,778 | $6,184,704 | $2,061,568 (See Note 1) |
| Stand-Alone Network Upgrades | |||||||
|---|---|---|---|---|---|---|---|
| RTEP ID | Description | Direct | Indirect | Total Cost ($USD) | Allocated Cost ($USD) | ||
| Labor | Materials | Labor | Materials | ||||
| (Pending) |
New Interconnection Substation, TSS934 Herman Road |
$22,552,684 | $12,093,696 | $2,902,153 | $715,964 | $38,264,497 | $12,754,832 (See Note 1) |
| Transmission Owner Interconnection Facilities | |||||||
|---|---|---|---|---|---|---|---|
| RTEP ID | Description | Direct | Indirect | Total Cost ($USD) | Allocated Cost ($USD) | ||
| Labor | Materials | Labor | Materials | ||||
| (Pending) |
TSS934 Herman Road Substation, Transmission Owner Interconnection Facilities |
$557,950 | $831,719 | $71,799 | $49,239 | $1,510,707 | $503,569 (See Note 1) |
Developer Build Option
Project Developer has the option ("Option to Build") to assume responsibility for the design, procurement and construction of Transmission Owner Interconnection Facilities and/or Stand-Alone Network Upgrades.
If Option to Build is elected, the Project Developer must fulfill additional requirements in accordance to PJM Manual 14C, section 5.1 and PJM Manual 14H, section 8.6.2.
The cost estimates for eligible facilities and Option to Build oversight are highlighted below:
| Network Upgrades | |||||||
|---|---|---|---|---|---|---|---|
| RTEP ID | Description | Direct | Indirect | Total Cost ($USD) | Allocated Cost ($USD) | ||
| Labor | Materials | Labor | Materials | ||||
| (Pending) |
4 Remote Ends - ICON Nodes at STA 6 Byron, TSS 144 Wayne, TSS 937 Lee County and TSS 113 Waterman |
$265,891 | $48,746 | $89,871 | $2,906 | $407,414 | $135,805 (See Note 1) |
| (Pending) |
TSS155 Electric Junction - Remote End Relay Upgrades |
$519,771 | $132,521 | $98,736 | $7,207 | $758,235 | $252,745 (See Note 1) |
| (Pending) |
TSS120 Electric Junction - Remote End Relay Upgrades |
$211,882 | $13,326 | $40,249 | $725 | $266,182 | $88,727 (See Note 1) |
| (Pending) |
TSS111 Electric Junction - Remote End Relay Upgrades |
$519,771 | $132,521 | $98,736 | $7,207 | $758,235 | $252,745 (See Note 1) |
| (Pending) |
L91609 Cut-in |
$3,737,427 | $1,909,568 | $709,967 | $103,843 | $6,460,805 | $2,153,602 (See Note 1) |
| (Pending) |
Fiber Installation |
$2,774,227 | $1,545,836 | $526,996 | $84,063 | $4,931,122 | $1,643,707 (See Note 1) |
| (Pending) |
Distribution Aux Power (3 miles) |
$1,211,626 | $792,167 | $230,162 | $43,078 | $2,277,033 | $759,011 (See Note 1) |
| Other | |||||||
|---|---|---|---|---|---|---|---|
| RTEP ID | Description | Direct | Indirect | Total Cost ($USD) | Allocated Cost ($USD) | ||
| Labor | Materials | Labor | Materials | ||||
| (Pending) |
TSS934 Herman Road Substation, Transmission Owner Interconnection Facilities, oversight |
$62,909 | $0 | $11,950 | $0 | $74,859 | $24,953 (See Note 1) |
| (Pending) |
New Interconnection Substation, TSS934 Herman Road, oversight |
$1,697,695 | $0 | $322,496 | $0 | $2,020,191 | $673,397 (See Note 1) |
| Build Option Price Comparison | |||||||
|---|---|---|---|---|---|---|---|
| Build Option | Total Cost | Allocated Cost | |||||
| Transmission Owner Build Option | $54,982,820 | $18,327,607 | |||||
| Developer Build Option | $17,954,076 | $5,984,692 | |||||
Based on the scope of work for the Interconnection Facilities, it is expected to take 60 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.
The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.
Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.
Notes on Cost Estimate:
- These estimates are Order-of-Magnitude estimates of the costs that ComEd would bill to the Project Developer for this interconnection. These estimates are based on a one-line electrical diagram of the project and the information provided by the Project Developer.
- There were no site visits performed for these estimates. There may be costs related to specific site related issues that are not identified in these estimates. The site reviews will be performed during the Facilities Study or during detailed engineering.
- These estimates are not a guarantee of the maximum amount payable by the Project Developer and the actual costs of ComEd's work may differ significantly from these estimates. The Project Developer will be responsible for paying actual costs of ComEd's work in accordance with the PJM Open Access Transmission Tariff.
- The Project Developer is responsible for all engineering, procurement, testing and construction of all equipment on the Project Developer’s side of the Point of Change in Ownership.
These cost estimates do not include cost of acquiring right-of-way for the transmission line and purchasing any additional land, if needed, for the line terminations.
Transmission Owner Analysis
No Transmission Owner impacts identified.
Developer Requirements
The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. ComEd interconnection requirements can be found here. Refer to AF2-200 Physical Interconnection Facilities Study for additional requirements found in the General Section of the report.
To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.
Revenue Metering and SCADA Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:Transmission Owner Requirements
- Temperature (degrees Fahrenheit)
- Atmospheric Pressure (hectopascals)
- Irradiance
- Forced outage data
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards and in the Physical Interconnection Facilities Study.
Summer Peak Analysis
The New Service Request was evaluated as a 200.0 MW (120.0 MW Capacity) injection in the ComEd area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential summer peak period network impacts were as follows:
Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).
The following flowgates remain after considering the topology reinforcements required by the cycle.
| Summer Peak Analysis | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | Facility Description | Contingency Name | Contingency Type | DC|AC | Final Cycle Loading | Rating (MVA) | Rating Type | MVA to Mitigate | MW Contribution | ||
| CE |
AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1 |
COMED_P4_006-45-BT3-8___SRT-A
CONTINGENCY 'COMED_P4_006-45-BT3-8___SRT-A' TRIP BRANCH FROM BUS 270678 TO BUS 270679 CKT Z1 /*BYRON ; B 345.0 - BYRON ; R 345.0 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1 /*LEE CO EC;BP 345.0 - BYRON ; B 345.0 END |
Breaker | AC | 128.12 | 1837.0 | STE | 2353.48 | 118.11 | ||
| CE |
AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1 |
COMED_P4_006-45-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_006-45-BT3-4___SRT-A' REMOVE UNIT 1 FROM BUS 274656 /*BYRON ;1U 25.0 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1 /*LEE CO EC;BP 345.0 - BYRON ; B 345.0 END |
Breaker | AC | 127.65 | 1837.0 | STE | 2344.89 | 118.07 | ||
| CE |
BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1 |
COMED_P4_023-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT3-4___SRT-A' TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1 /*COLLINS ; 765.0 - PLANO ; 765.0 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1 /*COLLINS ;2M 345.0 - COLLINS ; 765.0 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1 /*COLLINS ;2M 345.0 - COLLINS ; R 345.0 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1 /*COLLINS ;2M 345.0 - COLLINS ;2C 33.0 END |
Breaker | AC | 104.7 | 1837.0 | STE | 1923.35 | 15.31 | ||
| CE |
BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1 |
COMED_P4_023-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT2-3___SRT-A' TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1 /*COLLINS ; 765.0 - PLANO ; 765.0 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1 /*WILTON ; 765.0 - COLLINS ; 765.0 END |
Breaker | AC | 104.67 | 1837.0 | STE | 1922.79 | 15.31 | ||
| CE |
BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line
270670 to 934730 ckt 1 |
COMED_P4_023-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT4-5___SRT-A' TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1 /*WILTON ; 765.0 - COLLINS ; 765.0 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1 /*COLLINS ;2M 345.0 - COLLINS ; 765.0 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1 /*COLLINS ;2M 345.0 - COLLINS ; R 345.0 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1 /*COLLINS ;2M 345.0 - COLLINS ;2C 33.0 END |
Breaker | AC | 104.53 | 1837.0 | STE | 1920.2 | 15.31 | ||
| CE |
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1 |
COMED_P4-6_116-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_116-345-R______SRT-A' DISCONNECT BUS 270767 /*GOODINGS ;1R 345.0 DISCONNECT BUS 270769 /*GOODINGS ;2R 345.0 DISCONNECT BUS 275240 /*GOODINGS ;1M 138.0 TRIP BRANCH FROM BUS 270729 TO BUS 271385 TO BUS 275351 CKT 1 /*E FRANKFO; R 345.0 - E FRANKFO; R 138.0 - E FRANKFO;3C 34.5 END |
Breaker | AC | 110.44 | 2297.0 | STE | 2536.87 | 19.38 | ||
| CE |
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1 |
COMED_P4-6_111-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-R______SRT-A' DISCONNECT BUS 270731 /*ELECT JCT;4R 345.0 DISCONNECT BUS 270733 /*ELECT JCT;3R 345.0 DISCONNECT BUS 275183 /*ELECT JCT;3M 138.0 DISCONNECT BUS 275184 /*ELECT JCT;4M 138.0 END |
Breaker | AC | 122.42 | 1568.0 | STE | 1919.57 | 32.42 | ||
| CE |
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1 |
COMED_P4_116-45-L11614__SRT-A
CONTINGENCY 'COMED_P4_116-45-L11614__SRT-A' DISCONNECT BUS 270769 /*GOODINGS ;2R 345.0 TRIP BRANCH FROM BUS 270667 TO BUS 270665 CKT 1 /*BLUE ISL ;RT 345.0 - BLUE ISL ; R 345.0 TRIP BRANCH FROM BUS 270667 TO BUS 270927 CKT 1 /*BLUE ISL ;RT 345.0 - WILTON ; R 345.0 TRIP BRANCH FROM BUS 270769 TO BUS 270667 CKT 1 /*GOODINGS ;2R 345.0 - BLUE ISL ;RT 345.0 END |
Breaker | AC | 105.48 | 2297.0 | STE | 2422.86 | 16.46 | ||
| CE |
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1 |
COMED_P4_111-45-L11120__SRT-A
CONTINGENCY 'COMED_P4_111-45-L11120__SRT-A' DISCONNECT BUS 270733 /*ELECT JCT;3R 345.0 DISCONNECT BUS 275183 /*ELECT JCT;3M 138.0 MOVE 100 PERCENT LOAD FROM BUS 270749 TO BUS 270751 /*ESS W407M; R 345.0 - ESS W407M;9T 345.0 TRIP BRANCH FROM BUS 270733 TO BUS 270747 CKT 1 /*ELECT JCT;3R 345.0 - ESS W407K;0T 345.0 TRIP BRANCH FROM BUS 270747 TO BUS 270753 CKT 1 /*ESS W407K;0T 345.0 - ESS W407M;0T 345.0 TRIP BRANCH FROM BUS 270753 TO BUS 270749 CKT 1 /*ESS W407M;0T 345.0 - ESS W407M; R 345.0 TRIP BRANCH FROM BUS 270753 TO BUS 270813 CKT 1 /*ESS W407M;0T 345.0 - LOMBARD ; R 345.0 END |
Breaker | AC | 118.28 | 1568.0 | STE | 1854.57 | 30.13 | ||
| CE |
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1 |
COMED_P4_120-45-L12002__SRT-A
CONTINGENCY 'COMED_P4_120-45-L12002__SRT-A' DISCONNECT BUS 275198 /*LOMBARD ;2M 138.0 TRIP BRANCH FROM BUS 270813 TO BUS 270753 CKT 1 /*LOMBARD ; R 345.0 - ESS W407M;0T 345.0 TRIP BRANCH FROM BUS 270813 TO BUS 270781 CKT 1 /*LOMBARD ; R 345.0 - ITASCA ; R 345.0 TRIP BRANCH FROM BUS 270813 TO BUS 270809 CKT 1 /*LOMBARD ; R 345.0 - LISLE ; R 345.0 TRIP BRANCH FROM BUS 275191 TO BUS 270781 CKT 1 /*ITASCA ;2M 138.0 - ITASCA ; R 345.0 TRIP BRANCH FROM BUS 275191 TO BUS 271735 CKT 1 /*ITASCA ;2M 138.0 - ITASCA ; R 138.0 TRIP BRANCH FROM BUS 275191 TO BUS 275291 CKT 1 /*ITASCA ;2M 138.0 - ITASCA ;2C 34.5 END |
Breaker | AC | 118.84 | 1568.0 | STE | 1863.47 | 30.55 | ||
| CE |
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1 |
COMED_P4_120-38-TR82____SRT-A
CONTINGENCY 'COMED_P4_120-38-TR82____SRT-A' CLOSE LINE FROM BUS 272252 TO BUS 272253 CKT Z1 /*PL HILL ; B 138.0 - PL HILL ; R 138.0 CLOSE LINE FROM BUS 273236 TO BUS 273237 CKT Z1 /*LOMBARD ;13 13.2 - LOMBARD ;46 13.2 DISCONNECT BUS 275198 /*LOMBARD ;2M 138.0 TRIP BRANCH FROM BUS 270813 TO BUS 270753 CKT 1 /*LOMBARD ; R 345.0 - ESS W407M;0T 345.0 TRIP BRANCH FROM BUS 270813 TO BUS 270781 CKT 1 /*LOMBARD ; R 345.0 - ITASCA ; R 345.0 TRIP BRANCH FROM BUS 270813 TO BUS 270809 CKT 1 /*LOMBARD ; R 345.0 - LISLE ; R 345.0 TRIP BRANCH FROM BUS 271923 TO BUS 271569 CKT 1 /*LOMBARD ; R 138.0 - GRACE ; R 138.0 TRIP BRANCH FROM BUS 271923 TO BUS 271925 CKT Z1 /*LOMBARD ; R 138.0 - LOMBARD ;2R 138.0 TRIP BRANCH FROM BUS 271923 TO BUS 272253 CKT 1 /*LOMBARD ; R 138.0 - PL HILL ; R 138.0 TRIP BRANCH FROM BUS 271923 TO BUS 273237 CKT 2 /*LOMBARD ; R 138.0 - LOMBARD ;46 13.2 TRIP BRANCH FROM BUS 271925 TO BUS 275198 CKT 1 /*LOMBARD ;2R 138.0 - LOMBARD ;2M 138.0 END |
Breaker | AC | 118.76 | 1568.0 | STE | 1862.12 | 30.55 | ||
| CE |
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1 |
COMED_P4_116-45-TR82____SRT-A
CONTINGENCY 'COMED_P4_116-45-TR82____SRT-A' DISCONNECT BUS 270769 /*GOODINGS ;2R 345.0 TRIP BRANCH FROM BUS 270769 TO BUS 271565 TO BUS 275324 CKT 1 /*GOODINGS ;2R 345.0 - GOODINGS ; R 138.0 - GOODINGS ;2C 34.5 END |
Breaker | AC | 102.37 | 2297.0 | STE | 2351.35 | 16.47 | ||
| CE |
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1 |
COMED_P4_116-45-L0303___SRT-A
CONTINGENCY 'COMED_P4_116-45-L0303___SRT-A' DISCONNECT BUS 270769 /*GOODINGS ;2R 345.0 REMOVE SWSHUNT FROM BUS 270827 /*NEVADA ; R 345.0 TRIP BRANCH FROM BUS 936290 TO BUS 270827 CKT 1 /*AD2-038 TP 345.0 - NEVADA ; R 345.0 END |
Breaker | AC | 101.56 | 2297.0 | STE | 2332.79 | 16.48 | ||
| CE |
AURORA EC;RP-ELECT JCT;4R 345.0 kV Ckt 1 line
274749 to 270731 ckt 1 |
COMED_P4-6_111-345-B______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-B______SRT-A' DISCONNECT BUS 270730 /*ELECT JCT; B 345.0 DISCONNECT BUS 275182 /*ELECT JCT;1M 138.0 DISCONNECT BUS 275239 /*ELECT JCT;2M 138.0 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1 /*WOLFS ; B 345.0 - WOLFS ; B 138.0 - WOLFS ;1C 34.5 END |
Breaker | AC | 104.35 | 1568.0 | STE | 1636.26 | 32.22 | ||
| CE |
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1 |
COMED_P2-2_111_EJ-345R__3_SRT-A
CONTINGENCY 'COMED_P2-2_111_EJ-345R__3_SRT-A' DISCONNECT BUS 270733 /*ELECT JCT;3R 345.0 DISCONNECT BUS 275183 /*ELECT JCT;3M 138.0 END |
Bus | AC | 118.52 | 1568.0 | STE | 1858.36 | 30.13 | ||
| CE |
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1 |
COMED_P2-2_116_GG-345R__2_SRT-A
CONTINGENCY 'COMED_P2-2_116_GG-345R__2_SRT-A' DISCONNECT BUS 270769 /*GOODINGS ;2R 345.0 END |
Bus | AC | 102.37 | 2297.0 | STE | 2351.35 | 16.47 | ||
| CE |
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1 |
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2' TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1 /*AB1-089 TP 345.0 - WAYNE ; B 345.0 END |
Single | AC | 114.93 | 1568.0 | STE | 1802.13 | 7.04 | ||
| CE |
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1 |
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2' TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1 /*AB1-089 TP 345.0 - WAYNE ; B 345.0 END |
Single | AC | 114.93 | 1568.0 | STE | 1802.13 | 7.04 | ||
| CE |
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1 |
Base Case | Single | AC | 113.52 | 1201.0 | A | 1363.35 | 17.57 | ||
| CE |
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1 |
COMED_P1-2_345-L0626__B-R_SRT-A-1
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-1' TRIP BRANCH FROM BUS 270678 TO BUS 930480 CKT 1 /*BYRON ; B 345.0 - AB1-089 TP 345.0 END |
Single | AC | 105.93 | 1568.0 | STE | 1660.97 | 7.04 | ||
| CE |
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1 |
COMED_P1-2_345-L0626__B-R_SRT-A-1
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-1' TRIP BRANCH FROM BUS 270678 TO BUS 930480 CKT 1 /*BYRON ; B 345.0 - AB1-089 TP 345.0 END |
Single | AC | 105.93 | 1568.0 | STE | 1660.97 | 7.04 | ||
| CE |
AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1 |
Base Case | Single | AC | 109.81 | 1334.0 | A | 1464.93 | 64.89 | ||
| CE |
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1 |
COMED_P1-2_345-L11120_R-N_SRT-A
CONTINGENCY 'COMED_P1-2_345-L11120_R-N_SRT-A' MOVE 100 PERCENT LOAD FROM BUS 270749 TO BUS 270751 /*ESS W407M; R 345.0 - ESS W407M;9T 345.0 TRIP BRANCH FROM BUS 270733 TO BUS 270747 CKT 1 /*ELECT JCT;3R 345.0 - ESS W407K;0T 345.0 TRIP BRANCH FROM BUS 270747 TO BUS 270753 CKT 1 /*ESS W407K;0T 345.0 - ESS W407M;0T 345.0 TRIP BRANCH FROM BUS 270753 TO BUS 270749 CKT 1 /*ESS W407M;0T 345.0 - ESS W407M; R 345.0 TRIP BRANCH FROM BUS 270753 TO BUS 270813 CKT 1 /*ESS W407M;0T 345.0 - LOMBARD ; R 345.0 END |
Single | AC | 102.06 | 1568.0 | STE | 1600.22 | 18.16 | ||
| AEP/NIPS |
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1 |
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A' REMOVE SHUNT 1 FROM BUS 270644 /*WILTON ; 765.0 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1 /*WILTON ; 765.0 - 05DUMONT 765.0 END |
Single | AC | 105.88 | 1841.0 | B | 1949.29 | 16.77 | ||
| AEP/NIPS |
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1 |
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A' OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1 /*05DUMONT 765.0 - WILTON ; 765.0 END |
Single | AC | 105.88 | 1841.0 | B | 1949.25 | 16.77 | ||
| AEP/CE |
GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line
270771 to 243229 ckt 1 |
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A' REMOVE SHUNT 1 FROM BUS 270644 /*WILTON ; 765.0 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1 /*WILTON ; 765.0 - 05DUMONT 765.0 END |
Single | AC | 102.59 | 971.0 | B | 996.1 | 11.32 | ||
| AEP/CE |
GREENACRE; T-05OLIVE 345.0 kV Ckt 1 line
270771 to 243229 ckt 1 |
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A' OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1 /*05DUMONT 765.0 - WILTON ; 765.0 END |
Single | AC | 102.58 | 971.0 | B | 996.09 | 11.32 | ||
The following flowgates were eliminated after considering the topology reinforcements required by the cycle.
| Summer Peak Analysis - Eliminated Flowgates | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | Facility Description | Contingency Name | Contingency Type | DC|AC | Final Cycle Loading | Rating (MVA) | Rating Type | MVA to Mitigate | MW Contribution | ||
| CE/NIPS |
ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line
270886 to 255104 ckt 1 |
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A' OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1 /*05DUMONT 765.0 - WILTON ; 765.0 END |
Single | AC | 101.73 | 1091.0 | B | 1109.88 | 10.36 | ||
| CE |
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1 |
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A' OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1 /*05DUMONT 765.0 - WILTON ; 765.0 END |
Single | AC | 104.48 | 1483.0 | STE | 1549.48 | 14.8 | ||
| CE/NIPS |
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1 |
Base Case | Single | AC | 116.12 | 1091.0 | A | 1266.87 | 9.66 | ||
| CE |
ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line
270731 to 270733 ckt 1 |
COMED_P4-6_111-345-B______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-B______SRT-A' DISCONNECT BUS 270730 /*ELECT JCT; B 345.0 DISCONNECT BUS 275182 /*ELECT JCT;1M 138.0 DISCONNECT BUS 275239 /*ELECT JCT;2M 138.0 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1 /*WOLFS ; B 345.0 - WOLFS ; B 138.0 - WOLFS ;1C 34.5 END |
Breaker | AC | 100.12 | 1837.0 | STE | 1839.27 | 21.74 | ||
| CE/NIPS |
17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line
255112 to 270886 ckt 1 |
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A' OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1 /*05DUMONT 765.0 - WILTON ; 765.0 END |
Single | AC | 101.76 | 1091.0 | B | 1110.25 | 10.36 | ||
| CE |
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1 |
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A' REMOVE SHUNT 1 FROM BUS 270644 /*WILTON ; 765.0 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1 /*WILTON ; 765.0 - 05DUMONT 765.0 END |
Single | AC | 127.0 | 970.0 | STE | 1231.93 | 12.05 | ||
| CE |
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1 |
COMED_P4_112-45-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-45-BT4-5___SRT-A' TRIP BRANCH FROM BUS 270666 TO BUS 270664 CKT 1 /*BLUE ISL ;BT 345.0 - BLUE ISL ; B 345.0 TRIP BRANCH FROM BUS 270666 TO BUS 270926 CKT 1 /*BLUE ISL ;BT 345.0 - WILTON ; B 345.0 TRIP BRANCH FROM BUS 270770 TO BUS 270666 CKT 1 /*GOODINGS ;4B 345.0 - BLUE ISL ;BT 345.0 TRIP BRANCH FROM BUS 270852 TO BUS 270704 CKT 1 /*PONTIAC ; B 345.0 - LORETTO ; B 345.0 END |
Breaker | AC | 100.34 | 2297.0 | STE | 2304.71 | 20.89 | ||
| CE/NIPS |
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1 |
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A' OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1 /*05DUMONT 765.0 - WILTON ; 765.0 END |
Single | AC | 128.83 | 1399.0 | B | 1802.36 | 14.61 | ||
| CE/NIPS |
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1 |
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A' REMOVE SHUNT 1 FROM BUS 270644 /*WILTON ; 765.0 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1 /*WILTON ; 765.0 - 05DUMONT 765.0 END |
Single | AC | 128.83 | 1399.0 | B | 1802.33 | 14.61 | ||
| AEP/CE |
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1 |
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A' OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1 /*05DUMONT 765.0 - WILTON ; 765.0 END |
Single | AC | 143.05 | 971.0 | B | 1389.01 | 12.05 | ||
| CE/NIPS |
ST JOHN ; T-17GREEN_ACRE 345.0 kV Ckt 1 line
270886 to 255104 ckt 1 |
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A' REMOVE SHUNT 1 FROM BUS 270644 /*WILTON ; 765.0 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1 /*WILTON ; 765.0 - 05DUMONT 765.0 END |
Single | AC | 101.73 | 1091.0 | B | 1109.87 | 10.36 | ||
| AEP/NIPS |
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1 |
Base Case | Single | AC | 121.06 | 1075.0 | A | 1301.35 | 9.23 | ||
| CE |
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1 |
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A' REMOVE SHUNT 1 FROM BUS 270644 /*WILTON ; 765.0 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1 /*WILTON ; 765.0 - 05DUMONT 765.0 END |
Single | AC | 104.48 | 1483.0 | STE | 1549.43 | 14.8 | ||
| CE/NIPS |
17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line
255112 to 270886 ckt 1 |
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A' REMOVE SHUNT 1 FROM BUS 270644 /*WILTON ; 765.0 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1 /*WILTON ; 765.0 - 05DUMONT 765.0 END |
Single | AC | 101.76 | 1091.0 | B | 1110.24 | 10.36 | ||
| CE |
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1 |
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A' OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1 /*05DUMONT 765.0 - WILTON ; 765.0 END |
Single | AC | 127.0 | 970.0 | STE | 1231.93 | 12.05 | ||
| AEP/CE |
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1 |
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A' REMOVE SHUNT 1 FROM BUS 270644 /*WILTON ; 765.0 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1 /*WILTON ; 765.0 - 05DUMONT 765.0 END |
Single | AC | 143.05 | 971.0 | B | 1389.01 | 12.05 | ||
Summer Potential Congestion due to Local Energy Deliverability
PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.
Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.
The following flowgates remain after considering the topology reinforcements required by the cycle.
| Summer Potential Congestion due to Local Energy Deliverability | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | Facility Description | Contingency Name | Contingency Type | DC|AC | Final Cycle Loading | Rating (MVA) | Rating Type | MVA to Mitigate | MW Contribution | ||
| CE |
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1 |
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2' TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1 /*AB1-089 TP 345.0 - WAYNE ; B 345.0 END |
OP | AC | 156.03 | 1479.0 | B | 2307.73 | 11.74 | ||
| CE |
AF2-041 TP-ELECT JCT; B 345.0 kV Ckt 1 line
957470 to 270730 ckt 1 |
Base Case | OP | AC | 146.24 | 1334.0 | A | 1950.91 | 108.15 | ||
| CE |
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1 |
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2' TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1 /*AB1-089 TP 345.0 - WAYNE ; B 345.0 END |
OP | AC | 145.79 | 1479.0 | B | 2156.25 | 11.74 | ||
| CE |
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1 |
Base Case | OP | AC | 131.13 | 1201.0 | A | 1574.88 | 29.29 | ||
| CE |
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
274768 to 270678 ckt 1 |
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3' TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1 /*AF2-041 TP 345.0 - ELECT JCT; B 345.0 END |
OP | AC | 129.2 | 1726.0 | B | 2229.97 | 76.63 | ||
| CE/MEC |
QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line
270866 to 636610 ckt 1 |
EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S
CONTINGENCY 'EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S' OPEN BRANCH FROM BUS 636600 TO BUS 636605 CKT 1 /*SUB 39 3 345.0 - MEC CORDOVA3 345.0 END |
OP | AC | 117.93 | 1471.0 | B | 1734.8 | 23.74 | ||
| CE |
AF1-280 TP-LEE CO EC;BP 345.0 kV Ckt 1 line
946150 to 274768 ckt 1 |
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3' TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1 /*AF2-041 TP 345.0 - ELECT JCT; B 345.0 END |
OP | AC | 117.69 | 1479.0 | B | 1740.6 | 77.38 | ||
| CE |
AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line
930480 to 270916 ckt 1 |
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A' TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1 /*SILVER LK; R 345.0 - GARDEN PR; R 345.0 END |
OP | AC | 115.72 | 2058.0 | B | 2381.42 | 12.56 | ||
| CE |
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
274768 to 270678 ckt 1 |
Base Case | OP | AC | 109.41 | 1334.0 | A | 1459.48 | 29.25 | ||
| CE |
BYRON ; B-AB1-089 TP 345.0 kV Ckt 1 line
270678 to 930480 ckt 1 |
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A' TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1 /*SILVER LK; R 345.0 - GARDEN PR; R 345.0 END |
OP | AC | 104.44 | 2058.0 | B | 2149.4 | 12.56 | ||
| CE |
NELSON ; B-AF1-280 TP 345.0 kV Ckt 1 line
270828 to 946150 ckt 1 |
COMED_P1-2_345-L15502_B-R_SRT-A-3
CONTINGENCY 'COMED_P1-2_345-L15502_B-R_SRT-A-3' TRIP BRANCH FROM BUS 957470 TO BUS 270730 CKT 1 /*AF2-041 TP 345.0 - ELECT JCT; B 345.0 END |
OP | AC | 100.5 | 1479.0 | B | 1486.41 | 77.38 | ||
The following flowgates were eliminated after considering the topology reinforcements required by the cycle.
| Summer Potential Congestion due to Local Energy Deliverability | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | Facility Description | Contingency Name | Contingency Type | DC|AC | Final Cycle Loading | Rating (MVA) | Rating Type | MVA to Mitigate | MW Contribution | ||
| CE/NIPS |
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1 |
765-L11216__-S_SRT-A
CONTINGENCY '765-L11216__-S_SRT-A' TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1 /*WILTON ; 765.0 - COLLINS ; 765.0 END |
OP | AC | 103.38 | 1399.0 | B | 1446.29 | 18.95 | ||
| CE |
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1 |
Base Case | OP | AC | 102.98 | 1754.0 | A | 1806.27 | 15.34 | ||
Winter Peak Analysis
PJM will start performing Winter Peak analysis in Transition Cycle #2.
Winter Potential Congestion due to Local Energy Deliverability
PJM will start performing Winter Peak analysis in Transition Cycle #2.
Light Load Analysis
Light Load Analysis is Not Required.
Light Load Potential Congestion due to Local Energy Deliverability
Light Load Analysis is Not Required.
Short Circuit Analysis
Based on PJM Short Circuit Analysis, this project did not contribute >1% fault duty to previously identified overduty breakers, nor did it cause any new overduty breakers.
Stability Analysis
Analysis Complete - No Issues
Executive Summary
New Service Requests (projects) in PJM Transition Cycle 1, Cluster 15 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 15 projects.
This analysis is effectively a screening study to determine whether the addition of the Cluster 15 projects will meet the dynamics requirements of the NERC, ComEd and PJM reliability standards.
The load flow scenario for the analysis was based on the RTEP 2027 summer peak load case, modified to include applicable projects. Cluster 15 projects have been dispatched online at maximum power output, with 1.0 voltage at the terminal bus.
Cluster 15 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. Steady-state condition and 83 contingencies were studied, each with a 20 second simulation time period. Studied faults included:
a) Steady-state operation (20 second run);
b) Three-phase faults with normal clearing time;
c) Three-phase bus faults with normal clearing time;
d) Three-phase faults single-phase delayed clearing due to a stuck breaker (IPO breaker with FD Logic).
e) Three-phase faults with three-phase delayed clearing due to a stuck breaker (GO breakers with FD Logic);
f) Three-phase faults with three-phase delayed clearing due to a stuck breaker (GO Breakers with A-contact Logic);
g) Three-phase faults with single-phase delayed clearing due to a stuck breaker (GO Breakers with FD Logic);
h) Three-phase faults with loss of multiple-circuit tower line.
No relevant high-speed reclosing (HSR) contingencies nor single-phase bus faults were identified for this study.
There are no delayed (Zone 2) clearing faults due to dual primary relays being employed in the ComEd 345 kV transmission system.
For all simulations, the queue project under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance.
For all of the fault contingencies tested on the 2027 peak load case:
a) Cluster 15 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),
b) The system with Cluster 15 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.
c) Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus).
d) No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.
AF2-041, AF2-199, AF2-200, and AG1-434 meet the 0.95 leading and lagging PF requirement.
AF2-041[1] exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. This issue did not cause instability in the system and the models have been tuned to achieve a faster reactive power output settlement by updating Kc and VCFlag from REPCA1 module and also Kqi from REECA1 module of both generators in AF2-041.
AG1-434[2] exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. This issue did not cause instability in the system and the models have been tuned to achieve a faster reactive power output settlement by updating Kc from REPCTA1 module in generator AG1- 434.
AF2-199[3] exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. This issue did not cause instability in the system and the models have been tuned to achieve a faster reactive power output settlement by updating Kc from REPCA1 module in generator AF2-199.
AF2-200[4] exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. This issue did not cause instability in the system and the models have been tuned to achieve a faster reactive power output settlement by updating Kc from REPCA1 module and VCFlag in generator AF2-200.
Table 1: TC1 Cluster 15 Projects
Project | Fuel Type | Transmission Owner | MFO | Point of Interconnection |
AF2-041 | Solar | ComEd | 300 | Nelson-Electric Junction 345 kV |
AF2-199 | Solar | ComEd | 400 | Nelson-Electric Junction 345 kV |
AF2-200 | Solar | ComEd | 600 | Nelson-Electric Junction 345 kV |
AG1-434 | Wind | ComEd | 175 | Nelson-Electric Junction 345 kV |
The stability study results in this report identified system performance issues. PJM is actively performing simulations to assess the impacts of potential dynamic model parameter changes required to address identified stability issues. Additionally, feedback from the Transmission Owner is being incorporated into the stability study. The study will be finalized at the conclusion of Phase III of Transition Cycle 1.
The TC1 projects in Cluster15 listed above shall confirm all parameter adjustments described in this stability results summary with their DP2 data submission.
Reactive Power Analysis
The reactive power capability of AF2-200 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.
Steady-State Voltage Analysis
Steady State Voltage Analysis is Not Required.
New Service Request Dependencies
The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.
| New Service Requests Dependencies | ||
|---|---|---|
| Project ID | Project Name | Status |
| AA1-018 | Powerton-Goodings Grove | In Service |
| AA1-146 | Nelson | In Service |
| AA2-030 | Nelson | In Service |
| AA2-123 | Marengo 34kV | In Service |
| AB1-089 | Byron-Wayne 345kV #1 | Suspended |
| AC1-033 | Kewanee 138 kV | In Service |
| AC1-168 | Kewanee-Streator | Suspended |
| AC1-204 | Elwood | In Service |
| AC1-214 | Crescent Ridge | In Service |
| AC2-154 | Davis Creek 138kV | Suspended |
| AD1-013 | Twombly Road 138kV | Engineering & Procurement |
| AD1-016 | Marengo | Withdrawn |
| AD1-031 | Kewanee - E.D. Edwards 138 kV | Suspended |
| AD1-100 | Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV | Under Construction |
| AD1-129 | Belvidere 34 kV | Withdrawn |
| AD2-038 | Powerton-Nevada 345 kV | Under Construction |
| AD2-047 | Davis Creek 138 kV | Suspended |
| AD2-060 | Davis Creek 138kV | Suspended |
| AD2-066 | Mazon-Crescent Ridge 138 kV | Engineering & Procurement |
| AD2-134 | Shady Oaks | Partially in Service - Under Construction |
| AD2-172 | Lena 138kV | In Service |
| AD2-194 | Elwood 345 kV | Partially in Service - Under Construction |
| AE1-070 | Elwood 345 kV | Active |
| AE1-113 | Mole Creek 345 kV | Engineering & Procurement |
| AE1-114 | Maryland-Lancaster 138 kV | Active |
| AE1-134 | Nelson 345 kV | In Service |
| AE1-163 | Powerton-Nevada 345 kV | Engineering & Procurement |
| AE1-166 | Loretto-Wilton & Braidwood-Davis Creek | Active |
| AE1-172 | Loretto-Wilton Center | Active |
| AE1-205 | McLean 345 kV | Active |
| AE2-035 | Lena 138 kV | In Service |
| AE2-062 | Romeoville 12 kV | In Service |
| AE2-152 | Loretto-Wilton & Braidwood-Davis Creek | Active |
| AE2-173 | McLean 345 kV | Active |
| AE2-223 | McLean 345 kV | Active |
| AE2-255 | Molecreek 345 kV | Engineering & Procurement |
| AE2-281 | Powerton-Nevada 345 kV | Engineering & Procurement |
| AE2-321 | Belvidere-Marengo 138 kV | Active |
| AE2-341 | Sandwich-Plano 138 kV | Active |
| AF1-030 | Sandwich-Plano 138 kV | Active |
| AF1-048 | Belvidere-Marengo | Active |
| AF1-200 | Plano 345 kV | Active |
| AF1-280 | Nelson-Lee County | Active |
| AF1-296 | Garden Plain 138 kV | Active |
| AF1-314 | Lena - Lancaster 138 kV | Active |
| AF1-330 | Marengo 34.5 kV | Active |
| AF1-331 | Twombley Road | Active |
| AF2-027 | Zion Energy Center 345 kV | Active |
| AF2-031 | Calumet | Active |
| AF2-034 | Kendall 345kV | Active |
| AF2-041 | Nelson-Electric Junction 345 kV | Active |
| AF2-069 | Crescent Ridge 138 kV | Active |
| AF2-070 | Crescent Ridge 138 kV | Active |
| AF2-095 | Davis Creek 138 kV | Active |
| AF2-096 | Braidwood-East Frankfort 345 kV | Active |
| AF2-142 | Nevada 345 kV | Active |
| AF2-143 | Powerton-Nevada 345 kV | Active |
| AF2-182 | Nelson-Lee County 345 kV II | Active |
| AF2-199 | Nelson-Electric Junction 345 kV | Active |
| AF2-201 | Lena - Lancaster 138 kV | Active |
| AF2-225 | McLean 345 kV | Active |
| AF2-226 | Katydid Road 345 kV | Active |
| AF2-252 | Blue Mound 345 kV | Engineering & Procurement |
| AF2-319 | Katydid Road 345 kV | Active |
| AF2-329 | Sandwich-Plano 138 kV | Active |
| AF2-349 | SILVER LAKE- CHERRY VALLEY 345 KV | Active |
| AF2-350 | Kensington 138 kV | Active |
| AF2-352 | Blue Mound 345 kV | Active |
| AF2-359 | Olive-University Park 345 kV | Active |
| AF2-363 | Cherry Valley-Glidden 138 kV | Withdrawn |
| AF2-366 | Crego Rd 138 kV | Active |
| AF2-392 | Nelson-Dixon 138 kV | Active |
| AF2-393 | Nelson-Dixon 138 kV | Active |
| AF2-394 | Nelson-Dixon 138 kV | Active |
| AF2-441 | Burnham 138kV | Active |
| AG1-005 | Corbin-Crescent Ridge 138 kV | Active |
| AG1-044 | Whiteside County | In Service |
| AG1-118 | Sugar Grove-Waterman 138kV | Active |
| AG1-120 | Glidden-Cherry Valley 138 kV | Active |
| AG1-127 | Crego Rd 138 kV | Active |
| AG1-298 | Calumet-Burnham 345 kV | Active |
| AG1-374 | Blue Mound 345 kV | Active |
| AG1-434 | Electric Junction-Nelson 345 kV | Active |
| AG1-435 | Kewanee-Hennepin 138 kV | Active |
| AG1-436 | Olive-University Park 345 kV | Active |
| AG1-447 | Olive-University Park 345 kV | Active |
| AG1-462 | Cordova 345 kV | Active |
| AG1-478 | Wilmington 34.5 kV | Engineering & Procurement |
| AG1-512 | University Park North 345 kV | Active |
| AG1-513 | Aurora 138 kV | Suspended |
| AG1-553 | Cordova 345 kV | Active |
| X3-005 | Wildwood 12kV | In Service |
| Z1-073 | Mendota Hills | In Service |
| Z1-108 | McHenry 34kV | In Service |
| Z2-081 | Streator 34.5kV | In Service |
Affected Systems
In Phase II of the Cycle, PJM provides the Affected System Operator any updates on the PJM projects that require an Affected Systems Study based on their response at DP1. New Service Requests that require an Affected Systems Study are required to enter into an Affected Systems Study Agreement with the Affected System Operator, as applicable, prior to the close of DP2 or they will be withdrawn from the Cycle.
If the Project Developer already entered into the necessary agreement and the results are available, PJM will supply them in the Phase II SIS report. See below for the status of any required Affected Systems Study. A status of “Pending” means that the study is not yet completed by the Affected System Operator. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.
System Reinforcements
Based on the Phase II analysis results, this project has potential cost responsibility for the following System Reinforcements:
| AF2-200 System Reinforcements Cost Breakdown: | Type | TO | RTEP ID / TO ID | Title | MW Impact | Percent Allocation | Allocated Cost ($USD) | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Load Flow | ComEd | n6639.2 / CE_NUN_L15502_4 | Electric Junction 345kV line reconductor, upgrade 1-34kV Circuit Breaker (CB) & associated motor operated disconnect switches, replace station conductor at both terminals. | 118.1 MW | 8.2% | $4,244,216 | ||||
| Load Flow | ComEd | n3515.3 | 13.8 miles of line reconductoring plus 1 CB, station conductor, and relays at Cherry Valley | 7.0 MW | 12.5% | $3,513,405 | ||||
| Load Flow | ComEd | n7023.1 / CE_NUN_L11124.1 | Reconductor Electric Junction - Lombard L11124 345 kV Line, station condctor work and 345KV CB replacement. | 32.4 MW | 5.8% | $1,897,818 | ||||
| Load Flow | AEP | n9182 / AEPIMJMS01 | Rebuild Olive - AF2-359 345kV | 12.1 MW | 1.5% | $318,476 | ||||
| Load Flow | ComEd | n9268 / CE_NUN_L2002.2 | Reconductor, CB Replacement and Station Conductor Upgrades at Braidwood. | 15.3 MW | 2.4% | $419,534 | ||||
| Load Flow | AEP | n5769.4 / AEPI0066a | Rebuild/Recondutor 8.6 miles of ACSR ~ 954 ~ 45/7 ~ RAIL conductor to mitigate the overload | 9.2 MW | 1.4% | $319,517 | ||||
| Load Flow | ComEd | n8414 / CE_NUN_11119.1 | Electric Junction - Aurora 345 kV line - Re-conductor the line and upgrade station conductor | 32.2 MW | 4.0% | $298,230 | ||||
| Load Flow | ComEd | n6279 / CE_NUN_116BT3-4 | TSS 116 Replace 345 kV Circuit Breaker | 19.4 MW | 6.4% | $206,241 | ||||
| Load Flow | ComEd | n9192 / CE_NUN_L11124_3 | Upgrade Disconnect Switches on Electric Junction - Lombard 345 kV | 32.4 MW | 5.8% | $175,183 | ||||
| Load Flow | NIPS | n9122 / NIPS_TC1_13323 | Changeout of 2.9 miles of 2-900 ACSR overhead line | 9.2 MW | 1.4% | $71,034 | ||||
| Load Flow | ComEd | n9130 / CE_NUN_TSS 111 BT 3-4.1 | Station conductor and switch upgrades at TSS 111 Electric Junction | 21.7 MW | 2.8% | $42,567 | ||||
| Load Flow | ComEd | n8389 / CE_N8389_116BT3-4_1 | TSS 116 Replace Station Conductor | 19.4 MW | 6.4% | $64,450 | ||||
| Load Flow | AEP | n5769.1 | Perform engineering study for CT limits , and and relay compliance trip limits at Dumont substation | 16.8 MW | 2.2% | $17,424 | ||||
| Load Flow | AEP | n9183 / AEPIMJMS02 | Replace 2156 KCM ACSR 84/19 at Olive | 12.1 MW | 1.5% | $10,282 | ||||
| Load Flow | AEP | n5913 / AEPI0042a | Olive - Green Acre 345 kV Line Sag Study on the 40.64 miles of conductor. | 11.3 MW | 2.2% | $4,744 | ||||
| Load Flow | AEP | n9184 / AEPIMJMS03 | Adjust Relay Compliance Trip Limit at Olive | 12.1 MW | 1.5% | $227 | ||||
| Grand Total: | $11,603,348 | |||||||||
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n6639.2 / CE_NUN_L15502_4 | Electric Junction 345kV line reconductor, upgrade 1-34kV Circuit Breaker (CB) & associated motor operated disconnect switches, replace station conductor at both terminals. | $52,000,000 | $4,244,216 | 36 to 42 Months | |||
Contributor
Description: Replace existing 345kV line conductor and possibly tower structures for approx. 27 miles, Sag mitigation on existing 345kV line conductor for up to 13 miles, Upgrade station 345kV conductor and motor operated switches, Upgrade 345kV relay scheme at one terminal substation. Tower work and cost will be identified during the Facility Study Phase.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line | (Any) |
| ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line | (All) | A | 1683.0 MVA |
| ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line | (All) | B | 2068.0 MVA |
| ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line | (All) | C | 2564.0 MVA |
| ELECT JCT; B-AF2-041 TAP 345.0 kV Ckt 1 line | (All) | STE | 2367.0 MVA |
| ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line | (All) | A | 1683.0 MVA |
| ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line | (All) | B | 2068.0 MVA |
| ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line | (All) | C | 2564.0 MVA |
| ELECT JCT; B-AF2-041 TP 345.0 kV Ckt 1 line | (All) | STE | 2367.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-114 | 44.0 MW | 3.0% | $1,579,372 |
|
AF1-280
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
134.4 MW | 9.3% | $4,829,105 |
| AF1-296 | 97.8 MW | 6.8% | $3,516,088 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
17.2 MW | 1.2% | $617,698 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
159.4 MW | 11.0% | $5,729,688 |
|
AF2-182
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
201.6 MW | 13.9% | $7,243,693 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
53.1 MW | 3.7% | $1,909,908 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
118.1 MW | 8.2% | $4,244,216 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
16.1 MW | 1.1% | $579,822 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
109.3 MW | 7.6% | $3,926,042 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
32.9 MW | 2.3% | $1,183,720 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
22.0 MW | 1.5% | $789,147 |
| AG1-434 | 184.5 MW | 12.7% | $6,629,624 |
| AG1-462 | 121.4 MW | 8.4% | $4,362,875 |
| AG1-553 | 135.2 MW | 9.3% | $4,859,003 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n3515.3 | 13.8 miles of line reconductoring plus 1 CB, station conductor, and relays at Cherry Valley | $28,000,000 | $3,513,405 | 24 to 36 Months | |||
Contributor
Description: 13.8 miles of reconductor transmission line plus 1 CB, station conductor, and relays at Cherry Valley. The estimate provided does not include transmission tower replacement. This will be determined during the Network Upgarde Facility Study.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line | (Any) |
| CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line | (All) | B | 1726.0 MVA |
| CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line | (All) | A | 1334.0 MVA |
| CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line | (All) | C | 2084.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
7.7 MW | 13.8% | $3,858,062 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
10.6 MW | 18.8% | $5,270,107 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
3.5 MW | 6.3% | $1,756,702 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
7.0 MW | 12.5% | $3,513,405 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
10.7 MW | 19.0% | $5,330,958 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
4.5 MW | 8.0% | $2,236,030 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
7.0 MW | 12.5% | $3,493,952 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.1 MW | 9.1% | $2,540,784 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n7023.1 / CE_NUN_L11124.1 | Reconductor Electric Junction - Lombard L11124 345 kV Line, station condctor work and 345KV CB replacement. | $32,500,000 | $1,897,818 | 30 to 36 Months | |||
Contributor
Description: The upgrade will be to reconductor the line along with station conductor work at both line terminals and 2-345KV BT Circuit Breakers to be upgraded. Potential transmission tower replacement required with line reconductor. The decision about tower replacement and cost for this work will not be known until the Phase 3 system upgrade Facility Study is completed per the PJM process.Upgrade 345KV disconnect switches at both terminals.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | SUM | A | 1461.0 MVA |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | SUM | B | 1656.0 MVA |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | SUM | C | 1913.0 MVA |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | SUM | STE | 1909.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
18.6 MW | 3.4% | $1,088,850 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
12.4 MW | 2.2% | $725,900 |
| AF1-200 | 210.5 MW | 37.9% | $12,322,091 |
|
AF1-280
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
17.7 MW | 3.2% | $1,035,520 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
15.2 MW | 2.7% | $891,276 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
43.8 MW | 7.9% | $2,562,075 |
|
AF2-182
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
26.5 MW | 4.8% | $1,553,250 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
14.6 MW | 2.6% | $854,045 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
32.4 MW | 5.8% | $1,897,818 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
14.3 MW | 2.6% | $836,600 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
5.2 MW | 0.9% | $306,341 |
| AF2-349 | 18.2 MW | 3.3% | $1,063,970 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
17.5 MW | 3.2% | $1,026,036 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.3 MW | 1.0% | $309,327 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
3.5 MW | 0.6% | $206,238 |
| AG1-118 | 38.1 MW | 6.9% | $2,231,732 |
| AG1-434 | 25.4 MW | 4.6% | $1,484,290 |
| AG1-462 | 17.0 MW | 3.1% | $995,712 |
| AG1-553 | 18.9 MW | 3.4% | $1,108,929 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | n9182 / AEPIMJMS01 | Rebuild Olive - AF2-359 345kV | $35,000,000 | $318,476 | 30 to 36 Months | |||
ContributorEliminated Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report. Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.
Description: Rebuild the ~7.3 mile 345 kV line section between Olive and AF2-359 POI. The standard conductor for 345kV lines is 2-bundle 954 ACSR 45/7 RAIL.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | SUM | A | 1025.0 MVA |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | SUM | B | 1318.0 MVA |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | WIN | A | 1298.0 MVA |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | WIN | B | 1370.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-070 | 15.1 MW | 1.8% | $398,584 |
| AE1-114 | 11.2 MW | 1.4% | $296,804 |
| AE1-172 | 19.5 MW | 2.4% | $516,433 |
|
AE2-321
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
10.3 MW | 1.2% | $273,414 |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
16.2 MW | 1.9% | $427,868 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
10.8 MW | 1.3% | $285,254 |
|
AF1-048
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
5.4 MW | 0.6% | $142,720 |
| AF1-200 | 215.6 MW | 25.9% | $5,698,473 |
| AF1-296 | 14.4 MW | 1.7% | $381,114 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
16.1 MW | 1.9% | $424,987 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
18.1 MW | 2.2% | $477,688 |
| AF2-095 | 17.9 MW | 2.1% | $472,032 |
| AF2-096 | 34.1 MW | 4.1% | $900,269 |
| AF2-142 | 17.1 MW | 2.1% | $452,659 |
| AF2-143 | 16.3 MW | 2.0% | $431,885 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
6.0 MW | 0.7% | $159,238 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
12.1 MW | 1.5% | $318,476 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
2.6 MW | 0.3% | $68,188 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
4.6 MW | 0.5% | $120,360 |
| AF2-349 | 30.7 MW | 3.7% | $811,308 |
| AF2-350 | 11.2 MW | 1.3% | $295,033 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
14.5 MW | 1.7% | $382,964 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.5 MW | 0.7% | $144,305 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
3.6 MW | 0.4% | $96,204 |
| AF2-441 | 17.3 MW | 2.1% | $456,438 |
| AG1-005 | 11.0 MW | 1.3% | $291,359 |
| AG1-118 | 31.4 MW | 3.8% | $828,645 |
| AG1-120 | 12.2 MW | 1.5% | $322,018 |
| AG1-127 | 9.9 MW | 1.2% | $261,494 |
| AG1-298 | 43.4 MW | 5.2% | $1,148,099 |
| AG1-434 | 13.3 MW | 1.6% | $351,513 |
| AG1-435 | 10.4 MW | 1.3% | $276,189 |
|
AG1-436
⧉
Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AG1-436, AG1-447 |
106.6 MW | 12.8% | $2,816,860 |
|
AG1-447
⧉
Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AG1-436, AG1-447 |
46.7 MW | 5.6% | $1,233,202 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n9268 / CE_NUN_L2002.2 | Reconductor, CB Replacement and Station Conductor Upgrades at Braidwood. | $17,700,000 | $419,534 | 24 to 30 Months | |||
Contributor
Description: The scope of work will be to re-conductor approx.. 5.8 miles of 345Kv line, replace 2-345Kv Circuit Breakers at Station 20 Braidwood along with station conductor upgrade at Station 20. Upon comopetion of this work the SST E rating will be 2293 MVA (SUMMER) .
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| BRAIDWOOD; B-AD1-100 TAP 345.0 kV Ckt 1 line | (All) | STE | 2293.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
16.3 MW | 2.5% | $446,025 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
10.9 MW | 1.7% | $297,350 |
| AF1-200 | 335.2 MW | 51.9% | $9,182,320 |
|
AF1-280
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
13.1 MW | 2.0% | $358,250 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
14.8 MW | 2.3% | $405,781 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
20.7 MW | 3.2% | $566,373 |
| AF2-096 | 106.9 MW | 16.5% | $2,927,750 |
|
AF2-182
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
19.6 MW | 3.0% | $537,361 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
6.9 MW | 1.1% | $188,782 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
15.3 MW | 2.4% | $419,534 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
13.9 MW | 2.2% | $380,906 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
4.6 MW | 0.7% | $125,471 |
| AF2-349 | 22.5 MW | 3.5% | $615,192 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
12.7 MW | 2.0% | $347,155 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
3.8 MW | 0.6% | $104,678 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
2.5 MW | 0.4% | $69,776 |
| AG1-118 | 26.5 MW | 4.1% | $727,294 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | n5769.4 / AEPI0066a | Rebuild/Recondutor 8.6 miles of ACSR ~ 954 ~ 45/7 ~ RAIL conductor to mitigate the overload | $22,360,000 | $319,517 | 24 to 36 Months | |||
Contributor
Description: The existing 2-954 45/7 (Rail) ACSR has SN/SE ratings of 1409/1888 MVA if no clearance issues are identified. This conductor is the maximum the present structure class was intended to carry. It may be possible to install larger or higher-tensioned conductor without rebuilding the entire line, but detailed mechanical loading analysis will be required to determine if (or how many of) the existing structures could be re-used. Cost estimate is $22.3 M assuming a complete wreck and rebuild of the AEP owned portion of the line. Using 2-954 ACSS, the new conductor rating will be 2650 MVA for both SN and SE. New overall AEP end line ratings after upgrade: S/N: 1740 MVA S/E: 2034 MVA. PJM Network Upgrade N5769.4.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 1740.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 2034.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-070 | 12.0 MW | 1.9% | $416,773 |
| AE1-172 | 27.8 MW | 4.3% | $961,838 |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
8.0 MW | 1.2% | $276,823 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
5.3 MW | 0.8% | $184,099 |
| AF1-200 | 280.0 MW | 43.3% | $9,688,961 |
| AF1-296 | 20.3 MW | 3.1% | $701,657 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
22.5 MW | 3.5% | $777,774 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
13.9 MW | 2.1% | $479,258 |
| AF2-096 | 16.3 MW | 2.5% | $562,848 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
4.6 MW | 0.7% | $159,741 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
9.2 MW | 1.4% | $319,517 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
3.6 MW | 0.6% | $124,901 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
3.4 MW | 0.5% | $116,113 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
20.3 MW | 3.1% | $702,349 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
7.7 MW | 1.2% | $264,678 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.1 MW | 0.8% | $176,452 |
| AF2-441 | 35.2 MW | 5.4% | $1,217,867 |
| AG1-118 | 14.2 MW | 2.2% | $491,852 |
| AG1-298 | 88.2 MW | 13.6% | $3,050,549 |
| AG1-374 | 11.2 MW | 1.7% | $389,164 |
| AG1-434 | 18.6 MW | 2.9% | $643,878 |
| AG1-462 | 18.9 MW | 2.9% | $652,908 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n8414 / CE_NUN_11119.1 | Electric Junction - Aurora 345 kV line - Re-conductor the line and upgrade station conductor | $7,500,000 | $298,230 | 30 to 36 Months | |||
Contributor
Description: Re-conductor the line, upgrade station conductor at TSS 111 Electric Junction, upgrade 345KV L11119 circuit breaker TSS 111 - 345KV disconnect switches. The potential for tower replacement for the reconductoring is possible. This will not be identified until the Network Upgrade Facility Study is performed. If tower replacement is required, the estimate and timeline will be amended.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line | (All) | A | 1334.0 MVA |
| ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line | (All) | B | 1726.0 MVA |
| ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line | (All) | C | 2084.0 MVA |
| ELECT JCT;4R-AURORA EC;RP 345.0 kV Ckt 1 line | (All) | STE | 1837.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-114 | 27.4 MW | 3.4% | $253,689 |
|
AE2-321
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
24.9 MW | 3.1% | $230,900 |
|
AF1-048
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
13.0 MW | 1.6% | $120,536 |
| AF1-200 | 187.7 MW | 23.2% | $1,737,721 |
|
AF1-280
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
36.4 MW | 4.5% | $336,977 |
| AF1-296 | 28.2 MW | 3.5% | $260,955 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
42.8 MW | 5.3% | $395,996 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
43.5 MW | 5.4% | $402,614 |
|
AF2-182
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
54.6 MW | 6.7% | $505,471 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
14.5 MW | 1.8% | $134,208 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
32.2 MW | 4.0% | $298,230 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
40.2 MW | 5.0% | $371,716 |
| AF2-349 | 73.6 MW | 9.1% | $681,702 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
30.9 MW | 3.8% | $286,104 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
9.3 MW | 1.2% | $86,260 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
6.2 MW | 0.8% | $57,510 |
| AG1-118 | 28.3 MW | 3.5% | $261,982 |
| AG1-120 | 17.9 MW | 2.2% | $165,670 |
| AG1-434 | 28.2 MW | 3.5% | $261,149 |
| AG1-462 | 33.3 MW | 4.1% | $307,801 |
| AG1-553 | 37.0 MW | 4.6% | $342,809 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n6279 / CE_NUN_116BT3-4 | TSS 116 Replace 345 kV Circuit Breaker | $3,200,000 | $206,241 | 24 Months | |||
Contributor
Description: The upgrade will be to replace the 345kV BT3-4 circuit breaker at TSS 116. A preliminary estimate for the upgrade is $3.2M. A preliminary construction timeline id 24 months. Upon completion of the upgrade the ratings will be 1754/2246/2297/2488 MVA (SN/SLTE/SSTE/SLD.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (All) | A | 1754.0 MVA |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (All) | B | 2246.0 MVA |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (All) | C | 2488.0 MVA |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (All) | STE | 2297.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-070 | 26.0 MW | 8.6% | $276,591 |
|
AF1-280
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
19.0 MW | 6.3% | $201,718 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
20.3 MW | 6.8% | $216,478 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
26.2 MW | 8.7% | $278,432 |
|
AF2-182
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
28.4 MW | 9.5% | $302,577 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
8.7 MW | 2.9% | $92,814 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
19.4 MW | 6.4% | $206,241 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
19.1 MW | 6.3% | $203,197 |
| AF2-349 | 29.6 MW | 9.9% | $315,347 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
18.7 MW | 6.2% | $198,579 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.6 MW | 1.9% | $59,879 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
3.8 MW | 1.2% | $39,916 |
| AG1-118 | 26.9 MW | 8.9% | $286,061 |
| AG1-462 | 23.2 MW | 7.7% | $247,040 |
| AG1-553 | 25.9 MW | 8.6% | $275,133 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n9192 / CE_NUN_L11124_3 | Upgrade Disconnect Switches on Electric Junction - Lombard 345 kV | $3,000,000 | $175,183 | 24 Months | |||
Contributor
Description: Upgrade 345Kv motor operated disconnect switches at both line terminals. Upon completion the limit ratings will be 1560/1802/2083/2477 MVA (SN/ALTE/SSTE/SLD).
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | (All) | A | 1560.0 MVA |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | (All) | B | 1802.0 MVA |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | (All) | C | 2477.0 MVA |
| ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line | (All) | STE | 2083.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
18.6 MW | 3.4% | $100,509 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
12.4 MW | 2.2% | $67,006 |
| AF1-200 | 210.5 MW | 37.9% | $1,137,424 |
|
AF1-280
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
17.7 MW | 3.2% | $95,586 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
15.2 MW | 2.7% | $82,272 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
43.8 MW | 7.9% | $236,499 |
|
AF2-182
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
26.5 MW | 4.8% | $143,377 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
14.6 MW | 2.6% | $78,835 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
32.4 MW | 5.8% | $175,183 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
14.3 MW | 2.6% | $77,225 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
5.2 MW | 0.9% | $28,278 |
| AF2-349 | 18.2 MW | 3.3% | $98,213 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
17.5 MW | 3.2% | $94,711 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.3 MW | 1.0% | $28,553 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
3.5 MW | 0.6% | $19,037 |
| AG1-118 | 38.1 MW | 6.9% | $206,006 |
| AG1-434 | 25.4 MW | 4.6% | $137,011 |
| AG1-462 | 17.0 MW | 3.1% | $91,912 |
| AG1-553 | 18.9 MW | 3.4% | $102,363 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | NIPS | n9122 / NIPS_TC1_13323 | Changeout of 2.9 miles of 2-900 ACSR overhead line | $4,971,000 | $71,034 | TBD | |||
Contributor
Description: Changeout of 2.9 miles of 2-900 ACSR overhead line. Rating: SN/SE: 2133/2390
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 2133.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 2390.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 2174.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 2390.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-070 | 12.0 MW | 1.9% | $92,656 |
| AE1-172 | 27.8 MW | 4.3% | $213,833 |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
8.0 MW | 1.2% | $61,542 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
5.3 MW | 0.8% | $40,928 |
| AF1-200 | 280.0 MW | 43.3% | $2,154,017 |
| AF1-296 | 20.3 MW | 3.1% | $155,990 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
22.5 MW | 3.5% | $172,912 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
13.9 MW | 2.1% | $106,547 |
| AF2-096 | 16.3 MW | 2.5% | $125,131 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
4.6 MW | 0.7% | $35,513 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
9.2 MW | 1.4% | $71,034 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
3.6 MW | 0.6% | $27,767 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
3.4 MW | 0.5% | $25,814 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
20.3 MW | 3.1% | $156,144 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
7.7 MW | 1.2% | $58,842 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.1 MW | 0.8% | $39,228 |
| AF2-441 | 35.2 MW | 5.4% | $270,752 |
| AG1-118 | 14.2 MW | 2.2% | $109,347 |
| AG1-298 | 88.2 MW | 13.6% | $678,188 |
| AG1-374 | 11.2 MW | 1.7% | $86,518 |
| AG1-434 | 18.6 MW | 2.9% | $143,145 |
| AG1-462 | 18.9 MW | 2.9% | $145,152 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n9130 / CE_NUN_TSS 111 BT 3-4.1 | Station conductor and switch upgrades at TSS 111 Electric Junction | $2,400,000 | $42,567 | 24 to 28 Months | |||
ContributorEliminated Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report. Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.
Description: Upgrade station conductor 345KV bus 3 & bus4 at TSS 111 Electric Junction.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line | SUM | A | 1560.0 MVA |
| ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line | SUM | B | 1802.0 MVA |
| ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line | SUM | C | 2477.0 MVA |
| ELECT JCT;4R-ELECT JCT;3R 345.0 kV Ckt 1 line | SUM | STE | 2083.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|
AE2-321
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
15.9 MW | 2.1% | $31,120 |
|
AF1-048
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
8.3 MW | 1.1% | $16,245 |
| AF1-200 | 383.0 MW | 49.8% | $750,009 |
|
AF1-280
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
24.2 MW | 3.2% | $47,467 |
| AF1-296 | 19.4 MW | 2.5% | $38,035 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
27.7 MW | 3.6% | $54,278 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
29.3 MW | 3.8% | $57,466 |
|
AF2-182
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
36.4 MW | 4.7% | $71,200 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
9.8 MW | 1.3% | $19,155 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
21.7 MW | 2.8% | $42,567 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
26.0 MW | 3.4% | $50,951 |
| AF2-349 | 46.5 MW | 6.0% | $91,103 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
21.0 MW | 2.7% | $41,047 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
6.3 MW | 0.8% | $12,377 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
4.2 MW | 0.5% | $8,251 |
| AG1-118 | 21.4 MW | 2.8% | $41,987 |
| AG1-434 | 19.0 MW | 2.5% | $37,277 |
| AG1-462 | 23.1 MW | 3.0% | $45,152 |
| AG1-553 | 25.7 MW | 3.3% | $50,287 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n8389 / CE_N8389_116BT3-4_1 | TSS 116 Replace Station Conductor | $1,000,000 | $64,450 | 24 Months | |||
Contributor
Description: PJM Network Project- N8389.ComEd 345kV BT3-4 at TSS 116 SSTE rating is 2083 MVA. The upgrade will be to replace the station conductor at TSS 116. A preliminary estimate for the upgrade is $1M. A preliminary construction timeline is 24 months. Upon completion of the upgrade the ratings will be 2236/2874/3009/3358 MVA (SN/SLTE/SSTE/SLD.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (All) | A | 2236.0 MVA |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (All) | B | 2874.0 MVA |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (All) | C | 3358.0 MVA |
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (All) | STE | 3009.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-070 | 26.0 MW | 8.6% | $86,435 |
|
AF1-280
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
19.0 MW | 6.3% | $63,037 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
20.3 MW | 6.8% | $67,649 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
26.2 MW | 8.7% | $87,010 |
|
AF2-182
⧉
Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-280, AF2-182 |
28.4 MW | 9.5% | $94,555 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
8.7 MW | 2.9% | $29,004 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
19.4 MW | 6.4% | $64,450 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
19.1 MW | 6.3% | $63,499 |
| AF2-349 | 29.6 MW | 9.9% | $98,546 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
18.7 MW | 6.2% | $62,056 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.6 MW | 1.9% | $18,712 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
3.8 MW | 1.2% | $12,474 |
| AG1-118 | 26.9 MW | 8.9% | $89,394 |
| AG1-462 | 23.2 MW | 7.7% | $77,200 |
| AG1-553 | 25.9 MW | 8.6% | $85,979 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | n5769.1 | Perform engineering study for CT limits , and and relay compliance trip limits at Dumont substation | $780,000 | $17,424 | 12 to 18 Months | |||
Contributor
Description: An Engineering study will need to be conducted to determine if the Dumont CT Thermal Limit settings can be adjusted to mitigate the overload. New relay package will be required if the settings cannot be adjusted, Estimated Cost: $600,000. New AEP ratings: 1409/1868 MVA SN/SE.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 1409.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 1779.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-070 | 20.8 MW | 2.8% | $21,606 |
| AE1-172 | 27.8 MW | 3.7% | $28,892 |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
15.0 MW | 2.0% | $15,625 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
10.0 MW | 1.3% | $10,391 |
| AF1-200 | 300.0 MW | 40.0% | $311,822 |
| AF1-296 | 20.3 MW | 2.7% | $21,076 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
22.5 MW | 3.0% | $23,363 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
25.1 MW | 3.4% | $26,137 |
| AF2-096 | 28.0 MW | 3.7% | $29,087 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
8.4 MW | 1.1% | $8,712 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
16.8 MW | 2.2% | $17,424 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
3.6 MW | 0.5% | $3,752 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
6.3 MW | 0.8% | $6,555 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
20.3 MW | 2.7% | $21,097 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
7.7 MW | 1.0% | $7,950 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.1 MW | 0.7% | $5,300 |
| AF2-441 | 36.9 MW | 4.9% | $38,380 |
| AG1-118 | 26.1 MW | 3.5% | $27,105 |
| AG1-298 | 92.5 MW | 12.3% | $96,080 |
| AG1-374 | 19.9 MW | 2.7% | $20,693 |
| AG1-434 | 18.6 MW | 2.5% | $19,341 |
| AG1-462 | 18.9 MW | 2.5% | $19,612 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | n9183 / AEPIMJMS02 | Replace 2156 KCM ACSR 84/19 at Olive | $1,130,000 | $10,282 | 18 to 24 Months | |||
ContributorEliminated Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report. Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.
Description: Replace five (5) instances of 2156 KCM ACSR 84/19 station conductor at Olive
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | (All) | B | 1370.0 MVA |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | SUM | A | 1188.0 MVA |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | WIN | A | 1370.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-070 | 15.1 MW | 1.8% | $12,869 |
| AE1-114 | 11.2 MW | 1.4% | $9,583 |
| AE1-172 | 19.5 MW | 2.4% | $16,673 |
|
AE2-321
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
10.3 MW | 1.2% | $8,827 |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
16.2 MW | 1.9% | $13,814 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
10.8 MW | 1.3% | $9,210 |
|
AF1-048
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
5.4 MW | 0.6% | $4,608 |
| AF1-200 | 215.6 MW | 25.9% | $183,979 |
| AF1-296 | 14.4 MW | 1.7% | $12,305 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
16.1 MW | 1.9% | $13,721 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
18.1 MW | 2.2% | $15,422 |
| AF2-095 | 17.9 MW | 2.1% | $15,240 |
| AF2-096 | 34.1 MW | 4.1% | $29,066 |
| AF2-142 | 17.1 MW | 2.1% | $14,614 |
| AF2-143 | 16.3 MW | 2.0% | $13,944 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
6.0 MW | 0.7% | $5,141 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
12.1 MW | 1.5% | $10,282 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
2.6 MW | 0.3% | $2,202 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
4.6 MW | 0.5% | $3,886 |
| AF2-349 | 30.7 MW | 3.7% | $26,194 |
| AF2-350 | 11.2 MW | 1.3% | $9,525 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
14.5 MW | 1.7% | $12,364 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.5 MW | 0.7% | $4,659 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
3.6 MW | 0.4% | $3,106 |
| AF2-441 | 17.3 MW | 2.1% | $14,736 |
| AG1-005 | 11.0 MW | 1.3% | $9,407 |
| AG1-118 | 31.4 MW | 3.8% | $26,753 |
| AG1-120 | 12.2 MW | 1.5% | $10,397 |
| AG1-127 | 9.9 MW | 1.2% | $8,443 |
| AG1-298 | 43.4 MW | 5.2% | $37,067 |
| AG1-434 | 13.3 MW | 1.6% | $11,349 |
| AG1-435 | 10.4 MW | 1.3% | $8,917 |
|
AG1-436
⧉
Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AG1-436, AG1-447 |
106.6 MW | 12.8% | $90,944 |
|
AG1-447
⧉
Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AG1-436, AG1-447 |
46.7 MW | 5.6% | $39,815 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | n5913 / AEPI0042a | Olive - Green Acre 345 kV Line Sag Study on the 40.64 miles of conductor. | $211,328 | $4,744 | 24 to 36 Months | |||
Contributor
Description: A Sag Study will be required on the 40.64 miles of conductor to mitigate the overload. Depending on the sag study results, the cost for this upgrade is expected to be between $162,560 (no remediation required, just sag study) and $81.28 million (complete line Reconductor/rebuild). Time Estimate: a) Sag Study: 6-12 months b) Rebuild: The standard time required for construction differs from state to state. An approximate construction time would be 24 to 36 months after signing an interconnection agreement. Conductor will be operated at MOT.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line | (All) | A | 971.0 MVA |
| 05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line | (All) | B | 1413.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-070 | 14.1 MW | 2.8% | $5,925 |
| AE1-114 | 10.6 MW | 2.1% | $4,438 |
| AE1-172 | 18.5 MW | 3.7% | $7,761 |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
10.2 MW | 2.0% | $4,267 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
6.8 MW | 1.3% | $2,838 |
| AF1-200 | 203.1 MW | 40.3% | $85,119 |
| AF1-296 | 13.6 MW | 2.7% | $5,699 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
15.2 MW | 3.0% | $6,353 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
17.0 MW | 3.4% | $7,117 |
| AF2-095 | 10.3 MW | 2.0% | $4,296 |
| AF2-096 | 19.2 MW | 3.8% | $8,041 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
5.7 MW | 1.1% | $2,372 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
11.3 MW | 2.2% | $4,744 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
2.4 MW | 0.5% | $1,018 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
4.3 MW | 0.8% | $1,790 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
13.7 MW | 2.7% | $5,724 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.2 MW | 1.0% | $2,158 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
3.4 MW | 0.7% | $1,437 |
| AF2-441 | 19.4 MW | 3.8% | $8,121 |
| AG1-005 | 10.4 MW | 2.1% | $4,340 |
| AG1-118 | 17.6 MW | 3.5% | $7,394 |
| AG1-298 | 50.1 MW | 9.9% | $20,998 |
| AG1-434 | 12.5 MW | 2.5% | $5,255 |
| AG1-435 | 9.8 MW | 2.0% | $4,123 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | n9184 / AEPIMJMS03 | Adjust Relay Compliance Trip Limit at Olive | $25,000 | $227 | 18 to 24 Months | |||
ContributorEliminated Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report. Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.
Description: Adjust Relay Compliance Trip Limit at Olive
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | SUM | A | 1188.0 MVA |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | SUM | B | 1539.0 MVA |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | WIN | A | 1506.0 MVA |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | WIN | B | 1777.0 MVA |
| Cost Allocation | |||
|---|---|---|---|
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
| AE1-070 | 15.1 MW | 1.8% | $285 |
| AE1-114 | 11.2 MW | 1.4% | $212 |
| AE1-172 | 19.5 MW | 2.4% | $369 |
|
AE2-321
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
10.3 MW | 1.2% | $195 |
|
AE2-341
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
16.2 MW | 1.9% | $306 |
|
AF1-030
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
10.8 MW | 1.3% | $204 |
|
AF1-048
⧉
Belvidere - Marengo 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-321, AF1-048 |
5.4 MW | 0.6% | $102 |
| AF1-200 | 215.6 MW | 25.9% | $4,070 |
| AF1-296 | 14.4 MW | 1.7% | $272 |
|
AF1-314
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
16.1 MW | 1.9% | $304 |
|
AF2-041
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
18.1 MW | 2.2% | $341 |
| AF2-095 | 17.9 MW | 2.1% | $337 |
| AF2-096 | 34.1 MW | 4.1% | $643 |
| AF2-142 | 17.1 MW | 2.1% | $323 |
| AF2-143 | 16.3 MW | 2.0% | $308 |
|
AF2-199
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
6.0 MW | 0.7% | $114 |
|
AF2-200
⧉
Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-041, AF2-199, AF2-200 |
12.1 MW | 1.5% | $227 |
|
AF2-201
⧉
Lena - Lancaster 138 kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF1-314, AF2-201 |
2.6 MW | 0.3% | $49 |
|
AF2-329
⧉
Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AE2-341, AF1-030, AF2-329 |
4.6 MW | 0.5% | $86 |
| AF2-349 | 30.7 MW | 3.7% | $580 |
| AF2-350 | 11.2 MW | 1.3% | $211 |
|
AF2-392
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
14.5 MW | 1.7% | $274 |
|
AF2-393
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
5.5 MW | 0.7% | $103 |
|
AF2-394
⧉
Nelson-Dixon 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AF2-392, AF2-393, AF2-394 |
3.6 MW | 0.4% | $69 |
| AF2-441 | 17.3 MW | 2.1% | $326 |
| AG1-005 | 11.0 MW | 1.3% | $208 |
| AG1-118 | 31.4 MW | 3.8% | $592 |
| AG1-120 | 12.2 MW | 1.5% | $230 |
| AG1-127 | 9.9 MW | 1.2% | $187 |
| AG1-298 | 43.4 MW | 5.2% | $820 |
| AG1-434 | 13.3 MW | 1.6% | $251 |
| AG1-435 | 10.4 MW | 1.3% | $197 |
|
AG1-436
⧉
Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AG1-436, AG1-447 |
106.6 MW | 12.8% | $2,012 |
|
AG1-447
⧉
Olive - University Park 345kV - AEP: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI: AG1-436, AG1-447 |
46.7 MW | 5.6% | $881 |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | b3775.7 / b3775.7b | Upgrade breakers at Dumont substation on the Stillwell-Dumont 345 kV line. | $0 | $0 | Dec 01 2026 | |||
Not Contingent Note: AF2-200 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-200 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
Description: Upgrade the limiting element at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating. This includes replacement of breakers F and F1.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 1408.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 1887.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 1408.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 1887.0 MVA |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | b3775.11 / b3775.7a | Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating. | $0 | $0 | Dec 01 2026 | |||
Not Contingent Note: AF2-200 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-200 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
Description: Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 1409.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 1737.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 1409.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 1737.0 MVA |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | b3775.6 | Perform sag study mitigation work on the Dumont-Stillwell 345 kV line | $0 | $0 | Mar 04 2027 | |||
Not Contingent Note: AF2-200 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-200 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
Description: Perform sag study mitigation work on the Dumont-Stillwell 345 kV line (remove a center-pivot irrigation system from under the line, allowing for the normal and emergency ratings of the line to increase, replace two structures and modify a third structure).
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 1409.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 1718.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | A | 1409.0 MVA |
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (All) | B | 1718.0 MVA |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | b3775.1 | Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line | $0 | $0 | Dec 01 2026 | |||
Contingent Note: Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 may need this upgrade in-service to be deliverable to the PJM system. If AF2-200 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
Description: Outside of the Green Acres substation, swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line to the University Park N-Olive 345 kV line to create a University Park N-Green Acres-Olive and St. John-Olive 345 kV lines.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 17GREEN_ACRE-ST JOHN ; T 345.0 kV Ckt 1 line | (Any) |
| 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line | (Any) |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
| UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
| UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line | (Any) |
| 05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line | (Any) |
| 05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line | (Any) |
| 17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line | (All) | A | 9999.0 MVA |
| 17GREEN_ACRE-ST JOHN ; T 345.0 kV Ckt 1 line | (All) | A | 9999.0 MVA |
| 17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line | (All) | B | 9999.0 MVA |
| 17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line | (All) | ALDR | 9999.0 MVA |
| 17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line | (All) | STE | 9999.0 MVA |
| 05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | B | 9999.0 MVA |
| UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | A | 9999.0 MVA |
| UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | ALDR | 9999.0 MVA |
| UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | STE | 9999.0 MVA |
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | (All) | A | 9999.0 MVA |
| UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line | (All) | A | 9999.0 MVA |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | NextEra | s2509 / (Pending) | Rebuild the L97008: Univ. Park S/S-Olive S/S 345 kV | $0 | $0 | Dec 31 2023 | |||
Contingent Note: Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 may need this upgrade in-service to be deliverable to the PJM system. If AF2-200 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
Description: Rebuild the (L97008: Univ. Park S/S-Olive S/S 345 kV) of the ~20 mile double-circuit line withmonopoles and new conductor utilizing existing ROW ( Univ. Park S/S-Olive S/S 345 kV) .
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| 05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line | (Any) |
| UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line | (Any) |
| UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | B | 2495.0 MVA |
| UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | B | 2495.0 MVA |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | AEP | b3775.10 | Sag study on the Olive – University Park | $0 | $0 | Dec 01 2026 | |||
Contingent Note: Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 may need this upgrade in-service to be deliverable to the PJM system. If AF2-200 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
Description: Perform a sag study on the Olive – University Park 345kV line to increase the operating temperature to 225 F. Remediation work includes two tower replacements on the line.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line | (Any) |
| 05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line | (Any) |
| UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| 05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | A | 1679.0 MVA |
| 05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | B | 2058.0 MVA |
| UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | A | 1679.0 MVA |
| UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line | (All) | B | 2058.0 MVA |
| UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line | (All) | A | 1679.0 MVA |
| UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line | (All) | B | 2058.0 MVA |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | b3775.5 | Replace E. Frankfort 345 kV circuit breaker “9-14” with 3150A SF6 circuit breaker. | $0 | $0 | Dec 01 2026 | |||
Not Contingent Note: AF2-200 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-200 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
Description: Part of b3775 baseline. Replace E. Frankfort 345 kV circuit breaker “9-14” with 3150A SF6 circuit breaker.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | (All) | A | 1826.0 MVA |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | (All) | B | 2070.0 MVA |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | (All) | C | 2390.0 MVA |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | SUM | STE | 2385.0 MVA |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | b3775.4 / CE_B3775.4 | Rebuild 345 kV double circuit extending from Crete to E. Frankfort. | $0 | $0 | Dec 01 2026 | |||
Contingent Note: Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 may need this upgrade in-service to be deliverable to the PJM system. If AF2-200 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
Description: Part of b3775 baseline. Rebuild 12.7 miles of 345 kV double circuit extending from Crete to E. Frankfort with twin bundled 1277 ACAR conductor.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | (Any) |
| (Any) | 765-L11215__-S_SRT-A |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | (All) | A | 1679.0 MVA |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | (All) | B | 2058.0 MVA |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | (All) | C | 2280.0 MVA |
| E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line | (All) | STE | 2017.0 MVA |
| System Reinforcement | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Type | TO | RTEP ID / TO ID | Title | Total Cost ($USD) | Allocated Cost ($USD) | Time Estimate | |||
| Load Flow | ComEd | n5318.1 / ce-012a | Garden Prarie - Silver Lake R 345 kV Line - Reconductor and Station Bus Work | $57,000,000 | $0 | 30 Months | |||
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AF2-200 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AF2-200 could receive cost allocation. Although AF2-200 may not presently have cost responsibility for this upgrade, AF2-200 is a potential Aggregate Pool Contributor.
Description: The upgrade will be to re-conductor the line and station bus work. Potential transmission tower replacement required with line reconductor. The estimate for this work will not be known until the Phase 3 system upgrade Facility Study is completed per the PJM process.
| Flowgates Addressed by this Reinforcement | |
|---|---|
| Facility | Contingency |
| GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line | (Any) |
| SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line | (Any) |
| New Ratings | |||
|---|---|---|---|
| Facility | Rating Set | Rating Type | Rating Value |
| SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line | (All) | A | 1334.0 MVA |
| SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line | (All) | B | 1726.0 MVA |
| SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line | (All) | C | 2084.0 MVA |
| SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line | (All) | STE | 1867.0 MVA |
Attachments
[1]Winter load flow analysis will be performed starting in Transition Cycle #2.