AH1-150 Phase I Study Report
v1.00 released 2025-10-29 21:33
Nelson-Electric Junction 345 kV
120.0 MW Capacity / 200.0 MW Energy
Introduction
This Phase I System Impact Study Report (PH1) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, sections 307 and 308 for New Service Requests (projects) in Transition Cycle 2. The Project Developer/Eligible Customer (developer) is Steward Creek Solar, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Commonwealth Edison Company.
Preface
The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.
In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
- PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
- PJM will only perform load flow analysis during the Phase I System Impact Study.
- In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with Affected System impacts and provides each Affected System Operator with a list of New Service Request in the Cycle with potential impacts to their respective system.
- PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
- The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase I System Impact Study:
- Identify required Interconnection Facilities to accommodate the New Service Request.
- Identify required Network Upgrades to mitigate system violations from the Phase I System Impact Study.
- Provide planning-level preliminary estimates of Interconnection Facilities and Network Upgrades including scope, cost and elapsed time to complete the work.
Decision Point I Requirements
At the close of Phase I System Impact Study, PJM will initiate Decision Point I (DP1). During DP1, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.A.1. Additional information on these elements is available in PJM Manual 14H sections 4.4, 6, and 7.
Allowable project modifications at Decision Point I are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.
General
The Project Developer has proposed an uprate to a planned/existing Solar/Storage facility located in the Commonwealth Edison Company zone — Lee County, Illinois. This project is an increase to the developer’s AF2-041/AF2-199/AF2-200/AG2-660/AH1-044 project(s), which will share the same Point of Interconnection. The AH1-150 project is a 200.0 MW uprate (120.0 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 1000.0 MW with 620.0 MW of this output being recognized by PJM as Capacity.Project Information
Physical Interconnection Facility Study
Physical Interconnection Facilities Study is not performed as part of the Phase I System Impact Study. Physical Interconnection Facilities Study will commence in the Phase II System Impact Study.
Point of Interconnection
AH1-150 will interconnect on the Commonwealth Edison Company transmission system a the Herman Road 345 kV substation which taps the Nelson - Electric Junction 345 kV circuit.
Cost Summary
The table below shows a summary of the total cost estimates for this New Service Request project. In the Phase I SIS, the costs shown are subject to change as a result of a facility study performed by the TO during the Phase II or Phase III System Impact Study.
Based on the Phase I SIS results, the AH1-150 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit are also shown below.
| Cost Summary | |||
|---|---|---|---|
| Description | Cost Allocated to AH1-150 | Cost Subject to Readiness* | |
| Transmission Owner Interconnection Facilities (TOIF) | $0 | $0 | |
| Other Scope | $87,500 | $0 | |
| Option To Build Oversight | $0 | $0 | |
| Physical Interconnection Network Upgrades | |||
| Stand Alone Network Upgrades | $0 | $0 | |
| Network Upgrades | $0 | $0 | |
| System Reliability Network Upgrades | |||
| Steady State Thermal & Voltage (SP & LL) | $112,788,337 | $112,788,337 | |
| Transient Stability | $0 | $0 | |
| Short Circuit | $0 | $0 | |
| Transmission Owner Analysis | |||
| SubRegional | $0 | $0 | |
| Distribution | $0 | $0 | |
| Affected System Reinforcements | |||
| AFS - PJM Violatons | $8,812,294 | $0 | |
| AFS - Non-PJM Violations | $0 | $0 | |
| Total | $121,688,131 | $112,788,337 | |
* Contributes to calculation for Readiness Deposit #2 (RD2). See Readiness Deposit section of report for additional detail.
Definitions
Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.
Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.
Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.
Notes
Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.
Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.
Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.
Readiness Deposit
Per Tariff Part VII, Subpart D, section 309 (Decision Point I) A.1.a.i and PJM Manual 14H, section 6.2, Readiness Deposit #2 (RD2) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.
During Decision Point I (DP1), the Project Developer or Eligible Customer is required to submit Readiness Deposit #2, which is calculated as 10% of cost allocation for required Phase I Network Upgrades minus Readiness Deposit #1.
Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.
Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))
Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.
Readiness Deposit #2 Due for Project AH1-150
Readiness Deposit #2 has been calculated for the project based on the Phase I System Impact Study results and is shown in the table below. This Readiness Deposit #2 must be provided at Decision Point I through either a wire transfer or letter of credit per Manual 14H, Section 6.2.
| Readiness Deposit | |||
|---|---|---|---|
| Project ID | 10% of cost allocation for Phase I Network Upgrades | Readiness Deposit #1 Received (RD1) | Readiness Deposit #2 (RD2) for AH1-150 Project due at DP1 |
| A | B | A - B | |
| AH1-150 | $11,278,834 | $800,000 | $10,478,834 |
Note: Failure to provide an acceptable form of Readiness Deposit #2 by the end of Decision Point I will result in withdrawal and termination of the New Service Request.
For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.
Transmission Owner Scope of Work
If your project relies on Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and/or Network Upgrades that will be constructed by another New Service Request and the other New Service Request withdraws, the scope and costs will be allocated to your project, unless the Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and/or applicable Network Upgrades have been securitized in an ISA/GIA.
The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.
| Physical Interconnection | |||
|---|---|---|---|
| RTEP ID | Description | Total Cost ($USD) | Allocated Cost ($USD) |
| (Pending) | SCADA, Relay and Comm' review/updates. | $350,000 | $87,500 (See Note 1) |
Based on the scope of work for the Interconnection Facilities, it is expected to take a range of 12 to 15 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.
The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.
Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.
Notes on Cost Estimate:
- These estimates are order-of-magnitude estimates of the costs that ComEd would bill to the Project Developer for this interconnection. These estimates are based on a one-line electrical diagram of the project and the information provided by the Project Developer.
- There were no site visits performed for these estimates. There may be costs related to specific site related issues that are not identified in these estimates. The site reviews will be performed during the Facilities Study or during detailed engineering.
- These estimates are not a guarantee of the maximum amount payable by the Project Developer and the actual costs of ComEd's work may differ significantly from these estimates. The Project Developer will be responsible for paying actual costs of ComEd's work in accordance with the PJM Open Access Transmission Tariff.
- The Project Developer is responsible for all engineering, procurement, testing and construction of all equipment on the Project Developer’s side of the Point of Change in Ownership.
Transmission Owner Analysis
No Transmission Owner impacts identified.
Developer Requirements
The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. ComEd interconnection requirements can be found here.
To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.
Revenue Metering and SCADA Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:Transmission Owner Requirements
- Temperature (degrees Fahrenheit)
- Atmospheric Pressure (hectopascals)
- Irradiance
- Forced outage data
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.
Summer Peak Analysis
The New Service Request AH1-150 was evaluated as a 200.0 MW (120.0 MW Capacity) injection in the ComEd area.
AH1-150 was evaluated as part of a plant. The plant consists of AH1-150, AG2-660, AH1-151, AH1-044. The total Energy output of the plant was evaluated at its maximum seasonal capability of 1200.0 MW (620.0 MW under study).
Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.
| Study | Area | Facility Description | Contingency Name | Contingency Type | DC|AC | Final Cycle Loading | Rating (MVA) | Rating Type | MVA to Mitigate | MW Contribution | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| GD2 | ATSI | 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | ATSI_P1-2_TE-345-602_SRT-A | Single | AC | 142.52 % | 1683.0 | B | 2398.59 | 7.13 | |
| GD2 | ATSI | 02BRWELL-02FORD 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-030_SRT-A | Tower | AC | 170.25 % | 230.0 | B | 391.56 | 2.07 | |
| GD2 | ATSI | 02BRWELL-02FORD 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-031_SRT-A | Tower | AC | 166.37 % | 230.0 | B | 382.65 | 2.07 | |
| GD2 | ATSI | 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | ATSI_P1-2_OEC-345-825_SRT-A | Single | AC | 136.86 % | 1892.0 | B | 2589.31 | 6.14 | |
| GD2 | ATSI | 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | ATSI_P1-2_OEC-345-824_SRT-A | Single | AC | 136.39 % | 1892.0 | B | 2580.58 | 6.15 | |
| GD2 | ATSI | 02GRNFLD-02N DEPT 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-030_SRT-A | Tower | AC | 157.88 % | 242.0 | B | 382.07 | 2.07 | |
| GD2 | ATSI | 02GRNFLD-02N DEPT 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-031_SRT-A | Tower | AC | 154.19 % | 242.0 | B | 373.15 | 2.07 | |
| GD2 | ATSI | 02GRNFLD-02NASA 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-030_SRT-A | Tower | AC | 179.06 % | 192.0 | B | 343.8 | 1.85 | |
| GD2 | ATSI | 02GRNFLD-02NASA 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-031_SRT-A | Tower | AC | 177.37 % | 192.0 | B | 340.55 | 1.85 | |
| GD2 | ATSI | 02HAYES-02BEAVER 345.0 kV Ckt 1 line | ATSI_P1-2_OEC-345-825_SRT-A | Single | AC | 136.05 % | 1878.0 | B | 2554.95 | 6.28 | |
| GD2 | ATSI | 02HAYES-02BEAVER 345.0 kV Ckt 1 line | ATSI_P1-2_OEC-345-824_SRT-A | Single | AC | 135.68 % | 1878.0 | B | 2548.09 | 6.29 | |
| GD2 | ATSI | 02LAKVEW-02GRNFLD 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-027A_SRT-A | Tower | AC | 175.39 % | 352.0 | B | 617.37 | 3.09 | |
| GD2 | ATSI | 02LEMOYN-02DAV-BE 345.0 kV Ckt 1 line | ATSI_P1-2_TE-345-601_SRT-A | Single | AC | 113.99 % | 1878.0 | B | 2140.73 | 7.25 | |
| GD2 | ATSI | 02N DEPT-02BRWELL 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-030_SRT-A | Tower | AC | 171.21 % | 230.0 | B | 393.79 | 2.07 | |
| GD2 | ATSI | 02N DEPT-02BRWELL 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-031_SRT-A | Tower | AC | 167.34 % | 230.0 | B | 384.88 | 2.07 | |
| GD2 | ATSI | 02NASA-02BEAVER 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-030_SRT-A | Tower | AC | 178.12 % | 192.0 | B | 341.99 | 1.85 | |
| GD2 | ATSI | 02NASA-02BEAVER 138.0 kV Ckt 1 line | ATSI_P7-1_TE-345-031_SRT-A | Tower | AC | 176.43 % | 192.0 | B | 338.74 | 1.85 | |
| GD2 | AEP | 05ALLEN-05RPMONE 345.0 kV Ckt 1 line | AEP_P1-2_#7441_100545_SRT-A | Single | AC | 121.78 % | 1737.0 | B | 2115.3 | 9.95 | |
| GD2 | AEP | 05CLOV17_XFL-05CLOVRD 345.0 kV Ckt 17 line | AEP_P1-3_#7421_05CLOVRD 765_14_SRT-A | Single | AC | 106.66 % | 2320.0 | B | 2474.48 | 6.48 | |
| GD2 | AEP/DVP | 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | AP_P1-3_MP-765-501T_SRT-A | Single | AC | 121.06 % | 3393.4 | B | 4107.97 | 12.27 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P4_#7334_05JEFRSO 765_A2_SRT-A | Breaker | AC | 135.7 % | 5001.0 | B | 6786.3 | 38.79 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P4_#6189_05HANG R 765_D1_SRT-A | Breaker | AC | 121.54 % | 5001.0 | B | 6078.08 | 35.29 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P4_#1760_05JEFRSO 765_A_SRT-A | Breaker | AC | 121.53 % | 5001.0 | B | 6077.9 | 37.92 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P4_#709_05HANG R 765_D2_SRT-A | Breaker | AC | 120.42 % | 5001.0 | B | 6022.03 | 35.36 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P7-1_#11046___SRT-A | Tower | AC | 114.89 % | 5001.0 | B | 5745.77 | 34.74 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P4_#17234_05GRNTWN 765_N_SRT-A | Breaker | AC | 113.26 % | 5001.0 | B | 5664.12 | 36.8 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P7-1_#11001___SRT-A | Tower | AC | 113.17 % | 5001.0 | B | 5659.45 | 34.74 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P2-2_#6229_05MERIDN 345_1_SRT-A | Bus | AC | 108.21 % | 5001.0 | B | 5411.41 | 33.05 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P1-2_#709_546_SRT-A | Single | AC | 107.02 % | 5001.0 | B | 5352.14 | 24.67 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P2-2_#702_05JEFRSO 765_2_SRT-A | Bus | AC | 106.61 % | 5001.0 | B | 5331.65 | 32.42 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | Base Case | Single | AC | 100.56 % | 4558.0 | A | 4583.47 | 22.17 | |
| GD2 | AEP | 05DUMONT_RS-05SORENS 765.0 kV Ckt 1 line | AEP_P4_#7334_05JEFRSO 765_A2_SRT-A | Breaker | AC | 122.87 % | 5523.0 | B | 6786.3 | 38.79 | |
| GD2 | AEP | 05DUMONT_RS-05SORENS 765.0 kV Ckt 1 line | AEP_P4_#6189_05HANG R 765_D1_SRT-A | Breaker | AC | 110.05 % | 5523.0 | B | 6078.08 | 35.29 | |
| GD2 | AEP | 05DUMONT_RS-05SORENS 765.0 kV Ckt 1 line | AEP_P4_#1760_05JEFRSO 765_A_SRT-A | Breaker | AC | 110.05 % | 5523.0 | B | 6077.9 | 37.92 | |
| GD2 | AEP | 05DUMONT_RS-05SORENS 765.0 kV Ckt 1 line | AEP_P4_#709_05HANG R 765_D2_SRT-A | Breaker | AC | 109.04 % | 5523.0 | B | 6022.03 | 35.36 | |
| GD2 | AEP | 05DUMONT_RS-05SORENS 765.0 kV Ckt 1 line | AEP_P7-1_#11046___SRT-A | Tower | AC | 104.03 % | 5523.0 | B | 5745.77 | 34.74 | |
| GD2 | AEP | 05DUMONT_RS-05SORENS 765.0 kV Ckt 1 line | AEP_P4_#17234_05GRNTWN 765_N_SRT-A | Breaker | AC | 102.56 % | 5523.0 | B | 5664.12 | 36.8 | |
| GD2 | AEP | 05DUMONT_RS-05SORENS 765.0 kV Ckt 1 line | AEP_P7-1_#11001___SRT-A | Tower | AC | 102.47 % | 5523.0 | B | 5659.45 | 34.74 | |
| GD2 | AEP | 05DUMONT_RW-05DUMONT 765.0 kV Ckt Z1 line | COMED_P7-1_345-L94507_B-S_+_345-L97008_R-S_SRT-A | Tower | AC | 132.6 % | 4142.0 | B | 5492.34 | 53.86 | |
| GD2 | AEP | 05DUMONT_RW-05DUMONT 765.0 kV Ckt Z1 line | COMED_P7-1_345-L6607__B-S_+_345-L97008_R-S_SRT-A | Tower | AC | 130.85 % | 4142.0 | B | 5419.75 | 53.86 | |
| GD2 | AEP | 05DUMONT_RW-05DUMONT 765.0 kV Ckt Z1 line | AEP_P4_#2973_05DUMONT 345_F1_SRT-A | Breaker | AC | 120.9 % | 4142.0 | B | 5007.64 | 49.46 | |
| GD2 | AEP | 05DUMONT_RW-05DUMONT 765.0 kV Ckt Z1 line | AEP_P4_#2976_05DUMONT 345_F_SRT-A | Breaker | AC | 120.56 % | 4142.0 | B | 4993.52 | 49.37 | |
| GD2 | AEP | 05DUMONT_RW-05DUMONT 765.0 kV Ckt Z1 line | AEP_P2-2_#286_05EUGENE 345_2_SRT-A | Bus | AC | 114.72 % | 4142.0 | B | 4751.76 | 47.02 | |
| GD2 | AEP | 05DUMONT_RW-05DUMONT 765.0 kV Ckt Z1 line | AEP_P2-2_#15388_05ELDERBERRY 345_1_SRT-A | Bus | AC | 114.52 % | 4142.0 | B | 4743.27 | 46.66 | |
| GD2 | AEP | 05ELDERBERRY-05DUMONT 345.0 kV Ckt 1 line | COMED_P4_112-65-BT4-5___SRT-A | Breaker | AC | 115.77 % | 1868.0 | B | 2162.5 | 13.27 | |
| GD2 | AEP | 05ELDERBERRY-05DUMONT 345.0 kV Ckt 1 line | COMED_P4_112-65-BT3-4___SRT-A | Breaker | AC | 115.77 % | 1868.0 | B | 2162.5 | 13.27 | |
| GD2 | AEP | 05ELDERBERRY-05DUMONT 345.0 kV Ckt 1 line | AEP_P4_#2978_05DUMONT 765_B_SRT-A | Breaker | AC | 115.41 % | 1868.0 | B | 2155.91 | 12.38 | |
| GD2 | AEP | 05ELDERBERRY-05DUMONT 345.0 kV Ckt 1 line | AEP_P4_#671_05COOK 345_M2_SRT-A | Breaker | AC | 105.64 % | 1868.0 | B | 1973.33 | 9.58 | |
| GD2 | AEP | 05ELDERBERRY-05DUMONT 345.0 kV Ckt 1 line | AEP_P7-1_#10997___SRT-A | Tower | AC | 105.54 % | 1868.0 | B | 1971.58 | 9.58 | |
| GD2 | AEP | 05ELDERBERRY-05DUMONT 345.0 kV Ckt 1 line | AEP_P4_#6560_05COOK 345_M_SRT-A | Breaker | AC | 105.53 % | 1868.0 | B | 1971.3 | 9.58 | |
| GD2 | AEP | 05GAVIN-05MOUNTN 765.0 kV Ckt 1 line | AEP_P4_#8075_05MARYSV 765_A2_SRT-A | Breaker | AC | 123.29 % | 4571.0 | B | 5635.54 | 18.64 | |
| GD2 | AEP | 05HANGRCK_RJ-05HANG R 765.0 kV Ckt Z1 line | AEP_P1-2_#7441_100545_SRT-A | Single | AC | 106.88 % | 4571.0 | B | 4885.66 | 18.92 | |
| GD2 | AEP | 05JEFRSO-05JEFRSO 765.0/345.0 kV Ckt 2 transformer | AEP_P1-2_#709_546_SRT-A | Single | AC | 118.09 % | 3039.0 | B | 3588.67 | 11.07 | |
| GD2 | AEP/OVEC | 05JEFRSO-06CLIFTY 345.0 kV Ckt 1 line | AEP_P1-2_#709_546_SRT-A | Single | AC | 127.46 % | 2826.0 | B | 3601.92 | 11.07 | |
| GD2 | AEP | 05KAMMER_RG-05KAMMER 765.0 kV Ckt Z1 line | AP_P1-3_MP-765-501T_SRT-A | Single | AC | 118.76 % | 4142.0 | B | 4919.18 | 16.66 | |
| GD2 | AEP | 05MADDOX-05E LIMA 345.0 kV Ckt 1 line | AEP_P1-2_#7441_100545_SRT-A | Single | AC | 120.12 % | 2246.0 | B | 2697.98 | 9.54 | |
| GD2 | AEP | 05MALIS-05VASSEL 765.0 kV Ckt 1 line | AP_P1-3_MP-765-501T_SRT-A | Single | AC | 130.8 % | 4142.0 | B | 5417.86 | 16.93 | |
| GD2 | AEP | 05MALIS-05VASSEL 765.0 kV Ckt 1 line | AEP_P2-2_#8072_05MARYSV 765_2_SRT-A | Bus | AC | 114.32 % | 4142.0 | B | 4735.25 | 15.5 | |
| GD2 | AEP | 05MALIS-05VASSEL 765.0 kV Ckt 1 line | AEP_P1-2_#706_SRT-A | Single | AC | 114.0 % | 4142.0 | B | 4722.06 | 17.82 | |
| GD2 | AEP | 05MALIS-05VASSEL 765.0 kV Ckt 1 line | Base Case | Single | AC | 100.2 % | 4142.0 | A | 4150.44 | 13.93 | |
| GD2 | AEP | 05MARYSV-05MARYSV 765.0/345.0 kV Ckt 2 transformer | AEP_P4_#711_05MARYSV 765_A1_SRT-A | Breaker | AC | 109.69 % | 3097.0 | B | 3397.1 | 9.96 | |
| GD2 | AEP | 05MARYSV-05MARYSV 765.0/345.0 kV Ckt 2 transformer | AEP_P2-2_#7222_05MALIS 765_1_SRT-A | Bus | AC | 109.6 % | 3097.0 | B | 3394.36 | 9.8 | |
| GD2 | AEP | 05MARYSV-05MARYSV 765.0/345.0 kV Ckt 2 transformer | AEP_P4_#7222_05MALIS 765_D_SRT-A | Breaker | AC | 109.59 % | 3097.0 | B | 3394.1 | 9.8 | |
| GD2 | AEP | 05MARYSV-05MARYSV 765.0/345.0 kV Ckt 2 transformer | AEP_P4_#9729_05MALIS 138_M1_SRT-A | Breaker | AC | 109.53 % | 3097.0 | B | 3392.25 | 9.79 | |
| GD2 | AEP | 05MARYSV-05MARYSV 765.0/345.0 kV Ckt 2 transformer | AEP_P4_#9730_05MALIS 138_P1_SRT-A | Breaker | AC | 109.53 % | 3097.0 | B | 3392.06 | 9.79 | |
| GD2 | AEP | 05MARYSV-05MARYSV 765.0/345.0 kV Ckt 2 transformer | AEP_P4_#9728_05MALIS 138_L1_SRT-A | Breaker | AC | 109.5 % | 3097.0 | B | 3391.13 | 9.79 | |
| GD2 | AEP | 05MARYSV-05MARYSV 765.0/345.0 kV Ckt 2 transformer | AEP_P1-2_#711_6224_SRT-A | Single | AC | 105.12 % | 3097.0 | B | 3255.61 | 6.95 | |
| GD2 | AEP | 05MARYSV-05MARYSV 765.0/345.0 kV Ckt 2 transformer | AEP_P1-3_#7222_05MALIS 765_1_SRT-A | Single | AC | 104.65 % | 3097.0 | B | 3241.06 | 6.84 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AEP_P4_#2942_05KAMMER 765_PP_SRT-A | Breaker | AC | 134.69 % | 4571.0 | B | 6156.87 | 0.77 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AP_P2-3_MP-500-020_SRT-SL | Breaker | AC | 132.13 % | 4571.0 | B | 6039.56 | 0.78 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AP_P2-3_MP-500-021_SRT-SL | Breaker | AC | 132.1 % | 4571.0 | B | 6038.29 | 0.78 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AEP_P4_#37_05MOUNTN 765_B1_SRT-A | Breaker | AC | 132.09 % | 4571.0 | B | 6037.73 | 0.78 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AP_P1-3_MP-765-501T_SRT-A | Single | AC | 130.64 % | 4571.0 | B | 5971.43 | 16.98 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AEP_P4_#8085_05MARYSV 345_H_SRT-A | Breaker | AC | 120.72 % | 4571.0 | B | 5518.14 | 15.93 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AEP_P2-2_#8072_05MARYSV 765_2_SRT-A | Bus | AC | 119.53 % | 4571.0 | B | 5463.93 | 18.92 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AEP_P1-2_#706_SRT-A | Single | AC | 116.18 % | 4571.0 | B | 5310.77 | 18.29 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | Base Case | Single | AC | 114.73 % | 4047.0 | A | 4643.02 | 14.01 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AEP_P7-1_#10944___SRT-A | Tower | AC | 111.6 % | 4571.0 | B | 5101.3 | 0.66 | |
| GD2 | AEP | 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | AP_P2-2_WP-500-DRT14_SRT-SL | Bus | AC | 107.3 % | 4571.0 | B | 4904.47 | 0.64 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AEP_P4_#2942_05KAMMER 765_PP_SRT-A | Breaker | AC | 134.71 % | 4571.0 | B | 6157.38 | 0.77 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AP_P2-3_MP-500-020_SRT-SL | Breaker | AC | 132.15 % | 4571.0 | B | 6040.67 | 0.78 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AP_P2-3_MP-500-021_SRT-SL | Breaker | AC | 132.12 % | 4571.0 | B | 6039.4 | 0.78 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AEP_P4_#37_05MOUNTN 765_B1_SRT-A | Breaker | AC | 132.11 % | 4571.0 | B | 6038.85 | 0.78 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AP_P1-3_MP-765-501T_SRT-A | Single | AC | 130.66 % | 4571.0 | B | 5972.54 | 16.98 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AEP_P4_#8085_05MARYSV 345_H_SRT-A | Breaker | AC | 120.94 % | 4571.0 | B | 5528.24 | 15.93 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AEP_P2-2_#8072_05MARYSV 765_2_SRT-A | Bus | AC | 119.76 % | 4571.0 | B | 5474.17 | 18.92 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AEP_P1-2_#706_SRT-A | Single | AC | 116.43 % | 4571.0 | B | 5322.01 | 18.29 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | Base Case | Single | AC | 114.86 % | 4047.0 | A | 4648.25 | 14.01 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AEP_P7-1_#10944___SRT-A | Tower | AC | 111.67 % | 4571.0 | B | 5104.52 | 0.66 | |
| GD2 | AEP | 05MARYSVL_RM-05MALIS 765.0 kV Ckt 1 line | AP_P2-2_WP-500-DRT14_SRT-SL | Bus | AC | 107.38 % | 4571.0 | B | 4908.33 | 0.64 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P4_#7334_05JEFRSO 765_A2_SRT-A | Breaker | AC | 166.87 % | 4142.0 | B | 6911.8 | 0.7 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P4_#6189_05HANG R 765_D1_SRT-A | Breaker | AC | 153.33 % | 4142.0 | B | 6350.84 | 37.42 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P4_#709_05HANG R 765_D2_SRT-A | Breaker | AC | 151.73 % | 4142.0 | B | 6284.8 | 37.51 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P1-2_#709_546_SRT-A | Single | AC | 145.65 % | 4142.0 | B | 6032.93 | 26.17 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P4_#2995_05E LIMA 345_M_SRT-A | Breaker | AC | 145.3 % | 4142.0 | B | 6018.36 | 13.31 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P7-1_#11010___SRT-A | Tower | AC | 141.23 % | 4142.0 | B | 5849.93 | 28.2 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P1-2_#6463_16757_SRT-A | Single | AC | 140.14 % | 4142.0 | B | 5804.66 | 24.74 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P7-1_#17567_SRT-SL | Tower | AC | 140.03 % | 4142.0 | B | 5799.9 | 27.18 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P2-2_#16655_05GUNN RD SW 345_2_SRT-A | Bus | AC | 135.98 % | 4142.0 | B | 5632.19 | 32.58 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P2-2_#16654_05GUNN RD SW 345_1_SRT-A | Bus | AC | 135.75 % | 4142.0 | B | 5622.57 | 32.6 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | Base Case | Single | AC | 130.5 % | 4047.0 | A | 5281.19 | 23.07 | |
| GD2 | AEP | 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | AEP_P1-2_#17217_SRT-A | Single | AC | 115.67 % | 5523.0 | B | 6388.32 | 4.0 | |
| GD2 | AEP | 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | Base Case | Single | AC | 108.86 % | 4558.0 | A | 4961.85 | 12.59 | |
| GD2 | AEP | 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | AEP_P1-2_#7422_16_SRT-A | Single | AC | 106.56 % | 5523.0 | B | 5885.34 | 15.3 | |
| GD2 | AEP | 05OLIVE-05COOK 345.0 kV Ckt 1 line | AEP_P2-2_#15388_05ELDERBERRY 345_1_SRT-A | Bus | AC | 110.5 % | 1409.0 | B | 1556.92 | 6.82 | |
| GD2 | AEP | 05OLIVE-05COOK 345.0 kV Ckt 1 line | AEP_P4_#8817_05DUMONT 345_G2_SRT-A | Breaker | AC | 110.48 % | 1409.0 | B | 1556.69 | 6.82 | |
| GD2 | AEP | 05OLIVE-05COOK 345.0 kV Ckt 1 line | AEP_P7-1_#11000___SRT-A | Tower | AC | 110.08 % | 1409.0 | B | 1551.05 | 6.58 | |
| GD2 | AEP | 05OLIVE-05COOK 345.0 kV Ckt 1 line | AEP_P4_#14455_05DUMONT 345_G_SRT-A | Breaker | AC | 110.06 % | 1409.0 | B | 1550.78 | 6.58 | |
| GD2 | AEP | 05RPMONE-AG1-410 TP 345.0 kV Ckt 1 line | AEP_P1-2_#7441_100545_SRT-A | Single | AC | 132.35 % | 1868.0 | B | 2472.27 | 9.65 | |
| GD2 | AEP | 05SORENS-05SORENS 345.0/765.0 kV Ckt 3 transformer | AEP_P1-2_#7442_200545_SRT-A | Single | AC | 111.07 % | 3097.0 | B | 3439.74 | 14.29 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P4_#7334_05JEFRSO 765_A2_SRT-A | Breaker | AC | 125.19 % | 5523.0 | B | 6914.12 | 0.7 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P4_#6189_05HANG R 765_D1_SRT-A | Breaker | AC | 114.88 % | 5523.0 | B | 6345.03 | 37.42 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P4_#709_05HANG R 765_D2_SRT-A | Breaker | AC | 113.61 % | 5523.0 | B | 6274.56 | 37.51 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P1-2_#709_546_SRT-A | Single | AC | 109.05 % | 5523.0 | B | 6022.77 | 26.17 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P4_#2995_05E LIMA 345_M_SRT-A | Breaker | AC | 108.54 % | 5523.0 | B | 5994.88 | 13.31 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P7-1_#11010___SRT-A | Tower | AC | 105.44 % | 5523.0 | B | 5823.68 | 28.2 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P1-2_#6463_16757_SRT-A | Single | AC | 104.68 % | 5523.0 | B | 5781.3 | 24.74 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P7-1_#17567_SRT-SL | Tower | AC | 104.6 % | 5523.0 | B | 5777.18 | 27.18 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P2-2_#16655_05GUNN RD SW 345_2_SRT-A | Bus | AC | 101.5 % | 5523.0 | B | 5605.79 | 32.58 | |
| GD2 | AEP | 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | AEP_P2-2_#16654_05GUNN RD SW 345_1_SRT-A | Bus | AC | 101.3 % | 5523.0 | B | 5594.78 | 32.6 | |
| GD2 | AEP | 05SORENSN_RM-05MARYSVL_RS 765.0 kV Ckt 1 line | AEP_P4_#7334_05JEFRSO 765_A2_SRT-A | Breaker | AC | 113.98 % | 6066.0 | B | 6914.12 | 0.7 | |
| GD2 | AEP | 05SORENSN_RM-05MARYSVL_RS 765.0 kV Ckt 1 line | AEP_P4_#6189_05HANG R 765_D1_SRT-A | Breaker | AC | 104.7 % | 6066.0 | B | 6350.84 | 37.42 | |
| GD2 | AEP | 05SORENSN_RM-05MARYSVL_RS 765.0 kV Ckt 1 line | AEP_P4_#709_05HANG R 765_D2_SRT-A | Breaker | AC | 103.61 % | 6066.0 | B | 6284.8 | 37.51 | |
| GD2 | AEP/DEO&K | 05TANNER-08M.FORT 345.0 kV Ckt 1 line | AEP_P1-2_#7441_100545_SRT-A | Single | AC | 118.23 % | 2317.0 | B | 2739.4 | 6.58 | |
| GD2 | AEP | 05TWIN B-05MERIDN 345.0 kV Ckt 1 line | AEP_P4_#7442_05SORENS 765_K2_SRT-A | Breaker | AC | 105.25 % | 897.0 | B | 944.12 | 7.64 | |
| GD2 | AEP | 05WOLFCK-05W.WATERT 138.0 kV Ckt 1 line | AEP_P4_#37_05MOUNTN 765_B1_SRT-A | Breaker | AC | 103.4 % | 255.0 | B | 263.67 | 2.28 | |
| GD2 | AEP | 05WOLFCK-05W.WATERT 138.0 kV Ckt 1 line | AEP_P4_#2942_05KAMMER 765_PP_SRT-A | Breaker | AC | 102.5 % | 255.0 | B | 261.36 | 2.28 | |
| GD2 | AEP | 05WOLFCK-05W.WATERT 138.0 kV Ckt 1 line | AP_P2-3_MP-500-021_SRT-SL | Breaker | AC | 102.45 % | 255.0 | B | 261.25 | 2.2 | |
| GD2 | AEP/OVEC | 06KYGER-05SPORN 345.0 kV Ckt 1 line | AEP_P1-2_#7441_100545_SRT-A | Single | AC | 145.41 % | 1540.0 | B | 2239.27 | 6.98 | |
| GD2 | AEP/OVEC | 06KYGER-05SPORN 345.0 kV Ckt 1 line | AEP_P1-2_#309_15_SRT-A | Single | AC | 141.78 % | 1540.0 | B | 2183.34 | 6.1 | |
| GD2 | AEP/OVEC | 06PIERCE-05MARQUI 345.0 kV Ckt 1 line | AEP_P1-2_#709_546_SRT-A | Single | AC | 101.36 % | 1540.0 | B | 1561.02 | 6.29 | |
| GD2 | AEP/NIPS | 17P9700-EAST-05OLIVE 345.0 kV Ckt 1 line | COMED_P4_112-65-BT3-4___SRT-A | Breaker | AC | 143.98 % | 971.0 | B | 1398.09 | 15.88 | |
| GD2 | AEP/NIPS | 17P9700-EAST-05OLIVE 345.0 kV Ckt 1 line | COMED_P4_112-65-BT4-5___SRT-A | Breaker | AC | 143.98 % | 971.0 | B | 1398.08 | 15.88 | |
| GD2 | AEP/NIPS | 17P9700-EAST-05OLIVE 345.0 kV Ckt 1 line | AEP_P4_#2978_05DUMONT 765_B_SRT-A | Breaker | AC | 143.68 % | 971.0 | B | 1395.14 | 15.75 | |
| GD2 | AEP/NIPS | 17P9700-EAST-05OLIVE 345.0 kV Ckt 1 line | AEP_P4_#1750_05DUMONT 765_B1_SRT-A | Breaker | AC | 142.91 % | 971.0 | B | 1387.63 | 15.79 | |
| GD2 | AEP/NIPS | 17P9700-EAST-05OLIVE 345.0 kV Ckt 1 line | AEP_P1-2_#695_1681_SRT-A | Single | AC | 110.12 % | 971.0 | B | 1069.26 | 11.08 | |
| GD2 | AEP/NIPS | 17P9700-EAST-05OLIVE 345.0 kV Ckt 1 line | 765-L11215__-S_SRT-A | Single | AC | 110.11 % | 971.0 | B | 1069.22 | 11.08 | |
| GD2 | AEP/NIPS | 17P9700-EAST-05OLIVE 345.0 kV Ckt 1 line | AEP_P4_#2973_05DUMONT 345_F1_SRT-A | Breaker | AC | 102.04 % | 971.0 | B | 990.84 | 11.37 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | COMED_P4_112-65-BT3-4___SRT-A | Breaker | AC | 148.76 % | 1841.0 | B | 2738.58 | 23.91 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | COMED_P4_112-65-BT4-5___SRT-A | Breaker | AC | 148.75 % | 1841.0 | B | 2738.57 | 23.91 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | AEP_P4_#2978_05DUMONT 765_B_SRT-A | Breaker | AC | 147.24 % | 1841.0 | B | 2710.62 | 23.39 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | AEP_P4_#1750_05DUMONT 765_B1_SRT-A | Breaker | AC | 143.24 % | 1841.0 | B | 2637.11 | 23.09 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | 765-L11215__-S_SRT-A | Single | AC | 124.81 % | 1841.0 | B | 2297.73 | 16.7 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | AEP_P1-2_#695_1681_SRT-A | Single | AC | 124.8 % | 1841.0 | B | 2297.61 | 16.7 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | AEP_P7-1_#11009___SRT-A-1 | Tower | AC | 118.06 % | 1841.0 | B | 2173.47 | 17.84 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | AEP_P7-1_#11009___SRT-A-2 | Tower | AC | 116.53 % | 1841.0 | B | 2145.4 | 17.86 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | COMED_P4_023-65-BT3-4___SRT-A | Breaker | AC | 109.12 % | 1841.0 | B | 2008.87 | 16.52 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | AEP_P2-2_#15388_05ELDERBERRY 345_1_SRT-A | Bus | AC | 107.24 % | 1841.0 | B | 1974.3 | 14.31 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | Base Case | Single | AC | 106.35 % | 1385.0 | A | 1472.96 | 9.32 | |
| GD2 | AEP/NIPS | 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line | AEP_P2-2_#15389_05ELDERBERRY 345_2_SRT-A | Bus | AC | 101.5 % | 1841.0 | B | 1868.7 | 14.43 | |
| GD2 | AEP/NIPS | 17STJOHN-AF2-359 TP 345.0 kV Ckt 1 line | COMED_P4_112-65-BT4-5___SRT-A | Breaker | AC | 131.35 % | 1046.0 | B | 1373.94 | 15.54 | |
| GD2 | AEP/NIPS | 17STJOHN-AF2-359 TP 345.0 kV Ckt 1 line | COMED_P4_112-65-BT3-4___SRT-A | Breaker | AC | 131.35 % | 1046.0 | B | 1373.94 | 15.54 | |
| GD2 | AEP/NIPS | 17STJOHN-AF2-359 TP 345.0 kV Ckt 1 line | AEP_P4_#2978_05DUMONT 765_B_SRT-A | Breaker | AC | 131.08 % | 1046.0 | B | 1371.09 | 15.42 | |
| GD2 | AEP/NIPS | 17STJOHN-AF2-359 TP 345.0 kV Ckt 1 line | AEP_P4_#1750_05DUMONT 765_B1_SRT-A | Breaker | AC | 130.39 % | 1046.0 | B | 1363.91 | 15.45 | |
| GD2 | ATSI/METC | 18MOROCCO-02ALLEN 345.0 kV Ckt 1 line | ATSI_P2-3_TE-345-034T_SRT-A | Breaker | AC | 108.58 % | 1793.0 | B | 1946.81 | 4.17 | |
| GD2 | ATSI/METC | 18MOROCCO-02ALLEN 345.0 kV Ckt 1 line | ATSI_P2-3_TE-345-033T_SRT-A | Breaker | AC | 108.35 % | 1793.0 | B | 1942.65 | 4.11 | |
| GD2 | ATSI/ITCT | 19MON12-02LALLENDORF 345.0 kV Ckt 1 line | ATSI_P2-3_TE-345-023T_SRT-SL | Breaker | AC | 117.29 % | 1660.0 | B | 1946.94 | 4.35 | |
| GD2 | ATSI/ITCT | 19MON12-02LALLENDORF 345.0 kV Ckt 1 line | ATSI_P2-3_TE-345-022T_SRT-A | Breaker | AC | 117.16 % | 1660.0 | B | 1944.85 | 4.36 | |
| GD2 | CPLE/DVP | 6PERSON230 T-AC2-100 TAP 230.0 kV Ckt 1 line | DVP_P1-2: LN 570_SRT-A-3 | Single | AC | 182.88 % | 508.54 | B | 930.03 | 4.14 | |
| GD2 | CPLE/DVP | 6PERSON230 T-AC2-100 TAP 230.0 kV Ckt 1 line | DVP_P1-2: LN 570_SRT-A-2 | Single | AC | 178.67 % | 508.54 | B | 908.59 | 4.14 | |
| GD2 | AEP/AMIL | 7SNYDER-05SULLIVAN 345.0 kV Ckt 1 line | AEP_P4_#1750_05DUMONT 765_B1_SRT-A | Breaker | AC | 110.0 % | 1635.0 | B | 1798.48 | 12.71 | |
| GD2 | AEP/AMIL | 7SNYDER-05SULLIVAN 345.0 kV Ckt 1 line | AEP_P4_#2978_05DUMONT 765_B_SRT-A | Breaker | AC | 109.1 % | 1635.0 | B | 1783.79 | 12.77 | |
| GD2 | AEP/AMIL | 7SNYDER-05SULLIVAN 345.0 kV Ckt 1 line | COMED_P4_112-65-BT4-5___SRT-A | Breaker | AC | 108.37 % | 1635.0 | B | 1771.85 | 12.59 | |
| GD2 | AEP/AMIL | 7SNYDER-05SULLIVAN 345.0 kV Ckt 1 line | COMED_P4_112-65-BT3-4___SRT-A | Breaker | AC | 108.37 % | 1635.0 | B | 1771.85 | 12.59 | |
| GD2 | AEP/AMIL | 7SNYDER-05SULLIVAN 345.0 kV Ckt 1 line | AEP_P4_#3128_05EUGENE 345_A2_SRT-A | Breaker | AC | 107.8 % | 1635.0 | B | 1762.5 | 11.3 | |
| GD2 | AEP/AMIL | 7SNYDER-05SULLIVAN 345.0 kV Ckt 1 line | AEP_P2-2_#286_05EUGENE 345_2_SRT-A | Bus | AC | 106.68 % | 1635.0 | B | 1744.26 | 11.59 | |
| GD2 | CE | AD1-100 TAP1-WILTON ; B 345.0 kV Ckt 1 line | COMED_P4_023-65-BT3-4___SRT-A | Breaker | AC | 103.63 % | 2107.0 | STE | 2183.5 | 10.56 | |
| GD2 | CE | AD1-100 TAP1-WILTON ; B 345.0 kV Ckt 1 line | COMED_P4_023-65-BT2-3___SRT-A | Breaker | AC | 103.62 % | 2107.0 | STE | 2183.36 | 10.56 | |
| GD2 | CE | AD1-100 TAP1-WILTON ; B 345.0 kV Ckt 1 line | COMED_P4_023-65-BT4-5___SRT-A | Breaker | AC | 103.57 % | 2107.0 | STE | 2182.3 | 10.56 | |
| GD2 | CE | AE2-341 TP-W PLANO ; R 138.0 kV Ckt 1 line | COMED_P7-1_138-L11106_B-R_+_345-L93407_B-R_SRT-A-2 | Tower | AC | 108.52 % | 573.0 | ALDR | 621.85 | 7.31 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P4_144-45-BT5-8___SRT-A | Breaker | AC | 116.91 % | 1837.0 | STE | 2147.61 | 93.49 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P4_006-45-BT3-8___SRT-A | Breaker | AC | 116.25 % | 1837.0 | STE | 2135.59 | 101.02 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P4_006-45-BT3-4___SRT-A | Breaker | AC | 115.97 % | 1837.0 | STE | 2130.28 | 101.0 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P4_144-45-BT7-8___SRT-A | Breaker | AC | 115.82 % | 1837.0 | STE | 2127.56 | 94.06 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P4-6_006-345-BT78___SRT-A | Breaker | AC | 115.12 % | 1837.0 | STE | 2114.81 | 95.34 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | Base Case | Single | AC | 113.9 % | 1334.0 | A | 1519.44 | 64.55 | |
| IPD | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | Base Case | Single | AC | 104.07 % | 1334.0 | A | 1388.27 | 105.82 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P2-2_141_PV-138R__1_SRT-A | Bus | AC | 101.14 % | 1837.0 | STE | 1858.03 | 92.63 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P2-2_154_LV-345R__3_SRT-A | Bus | AC | 101.06 % | 1837.0 | STE | 1856.54 | 92.68 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P2-2_116_GG-345R__2_SRT-A | Bus | AC | 101.04 % | 1837.0 | STE | 1856.04 | 92.52 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P2-2_116_GG-345B__4_SRT-A | Bus | AC | 100.99 % | 1837.0 | STE | 1855.19 | 92.43 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P2-2_951_AR-345R__3_SRT-A | Bus | AC | 100.85 % | 1837.0 | STE | 1852.6 | 92.64 | |
| GD2 | CE | AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line | COMED_P4_144-45-BT7-8___SRT-A | Breaker | AC | 121.54 % | 1568.0 | STE | 1905.67 | 10.17 | |
| GD2 | CE | AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line | COMED_P4_144-45-BT5-8___SRT-A | Breaker | AC | 121.25 % | 1568.0 | STE | 1901.13 | 10.9 | |
| GD2 | CE | AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line | COMED_P4-6_006-345-BT78___SRT-A | Breaker | AC | 114.6 % | 1568.0 | STE | 1796.94 | 9.37 | |
| GD2 | CE | AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line | COMED_P2-2_111_EJ-345B__1_SRT-A | Bus | AC | 108.49 % | 1568.0 | STE | 1701.11 | 21.84 | |
| GD2 | CE | AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line | COMED_P4_111-45-L11124__SRT-A | Breaker | AC | 108.48 % | 1568.0 | STE | 1701.01 | 21.84 | |
| GD2 | CE | AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line | COMED_P4_111-45-TR81____SRT-A | Breaker | AC | 108.48 % | 1568.0 | STE | 1701.01 | 21.84 | |
| GD2 | CE | AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line | COMED_P1-2_345-L92805__B-R_SRT-A-2 | Single | AC | 107.3 % | 1568.0 | STE | 1682.43 | 7.11 | |
| GD2 | CE | AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line | COMED_P1-2_345-L0626__B-R_SRT-A | Single | AC | 103.44 % | 1568.0 | STE | 1621.92 | 7.11 | |
| GD2 | AEP | AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line | COMED_P4_112-65-BT4-5___SRT-A | Breaker | AC | 112.57 % | 1413.0 | B | 1590.63 | 15.46 | |
| GD2 | AEP | AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line | COMED_P4_112-65-BT3-4___SRT-A | Breaker | AC | 112.57 % | 1413.0 | B | 1590.62 | 15.46 | |
| GD2 | AEP | AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line | AEP_P4_#2978_05DUMONT 765_B_SRT-A | Breaker | AC | 112.38 % | 1413.0 | B | 1587.99 | 15.34 | |
| GD2 | AEP | AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line | AEP_P4_#1750_05DUMONT 765_B1_SRT-A | Breaker | AC | 111.86 % | 1413.0 | B | 1580.57 | 15.38 | |
| GD2 | AEP | AG1-410 TP-05MADDOX 345.0 kV Ckt 1 line | AEP_P1-2_#7441_100545_SRT-A | Single | AC | 138.82 % | 1868.0 | B | 2593.18 | 9.65 | |
| GD2 | CE/NIPS | BURNHAM ; B-17SHEFFIELD 345.0 kV Ckt 1 line | AEP_P4_#2978_05DUMONT 765_B_SRT-A | Breaker | AC | 116.17 % | 1441.0 | B | 1673.97 | 14.78 | |
| GD2 | CE/NIPS | BURNHAM ; B-17SHEFFIELD 345.0 kV Ckt 1 line | COMED_P4_112-65-BT4-5___SRT-A | Breaker | AC | 115.82 % | 1441.0 | B | 1668.91 | 14.83 | |
| GD2 | CE/NIPS | BURNHAM ; B-17SHEFFIELD 345.0 kV Ckt 1 line | COMED_P4_112-65-BT3-4___SRT-A | Breaker | AC | 115.81 % | 1441.0 | B | 1668.79 | 14.83 | |
| GD2 | CE/NIPS | BURNHAM ; B-17SHEFFIELD 345.0 kV Ckt 1 line | AEP_P4_#1750_05DUMONT 765_B1_SRT-A | Breaker | AC | 115.34 % | 1441.0 | B | 1662.03 | 14.76 | |
| GD2 | CE/NIPS | BURNHAM ; B-17SHEFFIELD 345.0 kV Ckt 1 line | COMED_P7-1_345-L94507_B-S_+_345-L97008_R-S_SRT-A | Tower | AC | 115.28 % | 1441.0 | B | 1661.12 | 14.04 | |
| GD2 | CE/NIPS | BURNHAM ; B-17SHEFFIELD 345.0 kV Ckt 1 line | COMED_P7-1_345-L6607__B-S_+_345-L97008_R-S_SRT-A | Tower | AC | 113.22 % | 1441.0 | B | 1631.55 | 14.04 | |
| GD2 | CE/NIPS | BURNHAM ;0R-17MUNSTER 345.0 kV Ckt 1 line | COMED_P7-1_345-L94507_B-S_+_345-L97008_R-S_SRT-A | Tower | AC | 121.82 % | 1591.0 | B | 1938.19 | 18.58 | |
| GD2 | CE/NIPS | BURNHAM ;0R-17MUNSTER 345.0 kV Ckt 1 line | COMED_P7-1_345-L6607__B-S_+_345-L97008_R-S_SRT-A | Tower | AC | 119.96 % | 1591.0 | B | 1908.56 | 18.58 | |
| GD2 | CE/NIPS | BURNHAM ;0R-17MUNSTER 345.0 kV Ckt 1 line | COMED_P4_112-65-BT3-4___SRT-A | Breaker | AC | 112.09 % | 1591.0 | B | 1783.3 | 18.44 | |
| GD2 | CE/NIPS | BURNHAM ;0R-17MUNSTER 345.0 kV Ckt 1 line | COMED_P4_112-65-BT4-5___SRT-A | Breaker | AC | 112.08 % | 1591.0 | B | 1783.23 | 18.44 | |
| GD2 | CE | CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line | COMED_P4_144-45-BT7-8___SRT-A | Breaker | AC | 117.47 % | 1568.0 | STE | 1841.95 | 10.17 | |
| GD2 | CE | CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line | COMED_P4_144-45-BT5-8___SRT-A | Breaker | AC | 117.23 % | 1568.0 | STE | 1838.11 | 10.9 | |
| GD2 | CE | CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line | COMED_P4-6_006-345-BT78___SRT-A | Breaker | AC | 110.49 % | 1568.0 | STE | 1732.54 | 9.37 | |
| GD2 | CE | CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line | COMED_P2-2_111_EJ-345B__1_SRT-A | Bus | AC | 104.67 % | 1568.0 | STE | 1641.15 | 21.84 | |
| GD2 | CE | CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line | COMED_P4_111-45-TR81____SRT-A | Breaker | AC | 104.66 % | 1568.0 | STE | 1641.05 | 21.84 | |
| GD2 | CE | CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line | COMED_P4_111-45-L11124__SRT-A | Breaker | AC | 104.66 % | 1568.0 | STE | 1641.05 | 21.84 | |
| GD2 | CE | CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line | COMED_P1-2_345-L92805__B-R_SRT-A-2 | Single | AC | 104.46 % | 1568.0 | STE | 1638.0 | 7.11 | |
| GD2 | CE | CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line | COMED_P1-2_345-L0626__B-R_SRT-A | Single | AC | 100.61 % | 1568.0 | STE | 1577.49 | 7.11 | |
| GD2 | CE | COLLINS ; R-COLLINS ;2M 345.0 kV Ckt 1 line | COMED_P4_167-65-BT3-4___SRT-A | Breaker | AC | 112.09 % | 1469.0 | STE | 1646.66 | 15.99 | |
| GD2 | CE | COLLINS ; R-COLLINS ;2M 345.0 kV Ckt 1 line | COMED_P4_167-65-BT4-5___SRT-A | Breaker | AC | 112.09 % | 1469.0 | STE | 1646.66 | 15.99 | |
| GD2 | CE | COLLINS ;2M-COLLINS ; 345.0/765.0 kV Ckt 1 transformer | COMED_P4_167-65-BT3-4___SRT-A | Breaker | AC | 112.27 % | 1469.0 | STE | 1649.17 | 15.99 | |
| GD2 | CE | COLLINS ;2M-COLLINS ; 345.0/765.0 kV Ckt 1 transformer | COMED_P4_167-65-BT4-5___SRT-A | Breaker | AC | 112.27 % | 1469.0 | STE | 1649.17 | 15.99 | |
| IPD | CE | ELECT JCT;1B-ELECT JCT;2B 138.0 kV Ckt Z1 line | COMED_P4_111-45-L16704T_SRT-A | Breaker | AC | 109.41 % | 536.0 | B | 586.43 | 15.65 | |
| GD2 | CE | ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | Base Case | Single | AC | 106.4 % | 1201.0 | A | 1277.87 | 16.73 | |
| GD2 | CE | ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | COMED_P4-6_111-345-R______SRT-A | Breaker | AC | 106.31 % | 1568.0 | STE | 1666.98 | 26.3 | |
| GD2 | CE | ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | COMED_P4_120-45-L12002__SRT-A | Breaker | AC | 104.58 % | 1568.0 | STE | 1639.84 | 24.95 | |
| GD2 | CE | ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | COMED_P4_120-38-TR82____SRT-A | Breaker | AC | 104.24 % | 1568.0 | STE | 1634.43 | 25.0 | |
| GD2 | CE | ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | COMED_P2-2_120_LO-345R__2_SRT-A | Bus | AC | 104.22 % | 1568.0 | STE | 1634.13 | 24.94 | |
| GD2 | CE | ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | COMED_P4_120-45-L10322__SRT-A | Breaker | AC | 104.22 % | 1568.0 | STE | 1634.1 | 24.94 | |
| GD2 | CE | ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | COMED_P4_120-45-L11120__SRT-A | Breaker | AC | 104.21 % | 1568.0 | STE | 1633.94 | 24.94 | |
| GD2 | CE | ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | COMED_P2-2_111_EJ-345R__3_SRT-A | Bus | AC | 103.45 % | 1568.0 | STE | 1622.09 | 24.43 | |
| GD2 | CE | ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | COMED_P2-2_111_EJ-345B__2_SRT-A | Bus | AC | 100.02 % | 1568.0 | STE | 1568.24 | 60.51 | |
| GD2 | CE | GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line | COMED_P4-6_116-345-R______SRT-A | Breaker | AC | 115.96 % | 2297.0 | STE | 2663.58 | 16.56 | |
| GD2 | CE | GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line | COMED_P4_116-45-L11614__SRT-A | Breaker | AC | 112.76 % | 2297.0 | STE | 2590.15 | 14.13 | |
| GD2 | CE | GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line | COMED_P2-2_116_GG-345R__2_SRT-A | Bus | AC | 107.78 % | 2297.0 | STE | 2475.7 | 14.16 | |
| GD2 | CE | GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line | COMED_P4_116-45-TR82____SRT-A | Breaker | AC | 107.77 % | 2297.0 | STE | 2475.59 | 14.16 | |
| GD2 | CE | GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line | COMED_P4_116-45-L0303___SRT-A | Breaker | AC | 103.98 % | 2297.0 | STE | 2388.45 | 14.17 | |
| GD2 | CE | GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line | AEP_P4_#2978_05DUMONT 765_B_SRT-A | Breaker | AC | 102.92 % | 2297.0 | STE | 2364.12 | 18.32 | |
| GD2 | CE | LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line | COMED_P4-6_111-345-B______SRT-A | Breaker | AC | 101.74 % | 1837.0 | STE | 1869.05 | 64.22 | |
| GD2 | CE | LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line | COMED_P2-2_111_EJ-345B__1_SRT-A | Bus | AC | 101.1 % | 1837.0 | STE | 1857.24 | 65.41 | |
| GD2 | CE | LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line | COMED_P4_111-45-L11124__SRT-A | Breaker | AC | 101.09 % | 1837.0 | STE | 1857.09 | 65.41 | |
| GD2 | CE | LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line | COMED_P4_111-45-TR81____SRT-A | Breaker | AC | 101.09 % | 1837.0 | STE | 1857.09 | 65.41 | |
| GD2 | CE | NELSON ; B-NELSON ;2M 345.0/138.0 kV Ckt 1 transformer | COMED_P4-6_155-138-B______SRT-A | Breaker | AC | 113.05 % | 493.0 | STE | 557.33 | 11.29 | |
| GD2 | CE | NELSON ;2M-NELSON ; R 138.0 kV Ckt 1 line | COMED_P4-6_155-138-B______SRT-A | Breaker | AC | 113.05 % | 493.0 | STE | 557.33 | 11.29 | |
| GD2 | CE | STEWARD ; B-HAUMESSER; B 138.0 kV Ckt 1 line | COMED_P4-6_111-345-B______SRT-A | Breaker | AC | 104.55 % | 455.0 | STE | 475.7 | 7.56 | |
| GD2 | CE | STEWARD ; B-HAUMESSER; B 138.0 kV Ckt 1 line | COMED_P2-2_111_EJ-345B__1_SRT-A | Bus | AC | 101.61 % | 455.0 | STE | 462.33 | 7.6 | |
| GD2 | CE | STEWARD ; B-HAUMESSER; B 138.0 kV Ckt 1 line | COMED_P4_111-45-TR81____SRT-A | Breaker | AC | 101.61 % | 455.0 | STE | 462.31 | 7.6 | |
| GD2 | CE | STEWARD ; B-HAUMESSER; B 138.0 kV Ckt 1 line | COMED_P4_111-45-L11124__SRT-A | Breaker | AC | 101.61 % | 455.0 | STE | 462.31 | 7.6 | |
| GD2 | CE | W PLANO ; R-PLANO; R 138.0 kV Ckt 1 line | COMED_P7-1_138-L11106_B-R_+_345-L93407_B-R_SRT-A-2 | Tower | AC | 105.74 % | 573.0 | ALDR | 605.9 | 7.31 | |
| GD2 | CE | WATERMAN ; R-SANDWICH ; R 138.0 kV Ckt 1 line | COMED_P7-1_138-L11106_B-R_+_345-L93407_B-R_SRT-A-2 | Tower | AC | 118.07 % | 381.0 | ALDR | 449.83 | 7.31 | |
| GD2 | CE | WILTON ; B-WILTON ;3M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT3-4___SRT-A | Breaker | AC | 116.36 % | 1469.0 | STE | 1709.33 | 15.58 | |
| GD2 | CE | WILTON ; B-WILTON ;3M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT2-3___SRT-A | Breaker | AC | 115.09 % | 1469.0 | STE | 1690.72 | 15.58 | |
| GD2 | CE | WILTON ; B-WILTON ;3M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT4-5___SRT-A | Breaker | AC | 115.09 % | 1469.0 | STE | 1690.68 | 15.58 | |
| GD2 | CE | WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT3-4___SRT-A | Breaker | AC | 116.32 % | 1469.0 | STE | 1708.81 | 15.53 | |
| GD2 | CE | WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT2-3___SRT-A | Breaker | AC | 114.6 % | 1469.0 | STE | 1683.43 | 15.53 | |
| GD2 | CE | WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT4-5___SRT-A | Breaker | AC | 114.59 % | 1469.0 | STE | 1683.4 | 15.53 | |
| GD2 | AEP/CE | WILTON ;-05DUMONT_RW 765.0 kV Ckt 1 line | COMED_P7-1_345-L94507_B-S_+_345-L97008_R-S_SRT-A | Tower | AC | 124.6 % | 4460.0 | B | 5557.2 | 53.86 | |
| GD2 | AEP/CE | WILTON ;-05DUMONT_RW 765.0 kV Ckt 1 line | COMED_P7-1_345-L6607__B-S_+_345-L97008_R-S_SRT-A | Tower | AC | 122.97 % | 4460.0 | B | 5484.63 | 53.86 | |
| GD2 | AEP/CE | WILTON ;-05DUMONT_RW 765.0 kV Ckt 1 line | AEP_P4_#2973_05DUMONT 345_F1_SRT-A | Breaker | AC | 114.03 % | 4460.0 | B | 5085.85 | 49.46 | |
| GD2 | AEP/CE | WILTON ;-05DUMONT_RW 765.0 kV Ckt 1 line | AEP_P4_#2976_05DUMONT 345_F_SRT-A | Breaker | AC | 113.85 % | 4460.0 | B | 5077.67 | 49.37 | |
| GD2 | AEP/CE | WILTON ;-05DUMONT_RW 765.0 kV Ckt 1 line | AEP_P2-2_#15388_05ELDERBERRY 345_1_SRT-A | Bus | AC | 108.23 % | 4460.0 | B | 4826.97 | 46.66 | |
| GD2 | AEP/CE | WILTON ;-05DUMONT_RW 765.0 kV Ckt 1 line | AEP_P2-2_#286_05EUGENE 345_2_SRT-A | Bus | AC | 108.12 % | 4460.0 | B | 4822.13 | 47.02 | |
| GD2 | CE | WILTON ;3M-WILTON ; 345.0/765.0 kV Ckt 1 transformer | COMED_P4_023-65-BT3-4___SRT-A | Breaker | AC | 116.6 % | 1469.0 | STE | 1712.79 | 15.58 | |
| GD2 | CE | WILTON ;3M-WILTON ; 345.0/765.0 kV Ckt 1 transformer | COMED_P4_023-65-BT2-3___SRT-A | Breaker | AC | 115.23 % | 1469.0 | STE | 1692.67 | 15.58 | |
| GD2 | CE | WILTON ;3M-WILTON ; 345.0/765.0 kV Ckt 1 transformer | COMED_P4_023-65-BT4-5___SRT-A | Breaker | AC | 115.22 % | 1469.0 | STE | 1692.63 | 15.58 | |
| GD2 | CE | WILTON ;4M-WILTON ; 345.0/765.0 kV Ckt 1 transformer | COMED_P4_023-65-BT3-4___SRT-A | Breaker | AC | 116.51 % | 1469.0 | STE | 1711.56 | 15.53 | |
| GD2 | CE | WILTON ;4M-WILTON ; 345.0/765.0 kV Ckt 1 transformer | COMED_P4_023-65-BT2-3___SRT-A | Breaker | AC | 114.7 % | 1469.0 | STE | 1684.87 | 15.53 | |
| GD2 | CE | WILTON ;4M-WILTON ; 345.0/765.0 kV Ckt 1 transformer | COMED_P4_023-65-BT4-5___SRT-A | Breaker | AC | 114.69 % | 1469.0 | STE | 1684.84 | 15.53 |
Winter Peak Analysis
The New Service Request AH1-150 was evaluated as a 200.0 MW (120.0 MW Capacity) injection in the ComEd area.
AH1-150 was evaluated as part of a plant. The plant consists of AH1-150, AG2-660, AH1-151, AH1-044. The total Energy output of the plant was evaluated at its maximum seasonal capability of 1200.0 MW (620.0 MW under study).
Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.
| Study | Area | Facility Description | Contingency Name | Contingency Type | DC|AC | Final Cycle Loading | Rating (MVA) | Rating Type | MVA to Mitigate | MW Contribution | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| GD2 | AEP | 05ALLEN-05RPMONE 345.0 kV Ckt 1 line | AEP_P4_#7445_05MARYSV 765_B_SRT-A | Breaker | AC | 120.08 % | 1737.0 | B | 2085.73 | 0.81 | |
| GD2 | AEP | 05ALLEN-05RPMONE 345.0 kV Ckt 1 line | AEP_P1-2_#7441_100545_SRT-A | Single | AC | 117.93 % | 1737.0 | B | 2048.41 | 0.81 | |
| GD2 | AEP | 05ALLEN-05RPMONE 345.0 kV Ckt 1 line | AEP_P4_#7441_05SORENS 765_J1_SRT-A | Breaker | AC | 115.82 % | 1737.0 | B | 2011.72 | 0.81 | |
| GD2 | AEP | 05ALLEN-05RPMONE 345.0 kV Ckt 1 line | AEP_P4_#7446_05MARYSV 765_B2_SRT-A | Breaker | AC | 115.73 % | 1737.0 | B | 2010.18 | 0.78 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P4_#7334_05JEFRSO 765_A2_SRT-A | Breaker | AC | 115.1 % | 5133.0 | B | 5908.33 | 2.25 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P4_#6189_05HANG R 765_D1_SRT-A | Breaker | AC | 102.6 % | 5133.0 | B | 5266.31 | 2.04 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P4_#1760_05JEFRSO 765_A_SRT-A | Breaker | AC | 102.42 % | 5133.0 | B | 5257.21 | 2.2 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P4_#709_05HANG R 765_D2_SRT-A | Breaker | AC | 101.4 % | 5133.0 | B | 5204.92 | 2.05 | |
| GD2 | AEP | 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | AEP_P1-2_#709_546_SRT-A | Single | AC | 101.4 % | 5133.0 | B | 5204.83 | 2.05 | |
| GD2 | AEP | 05JEFRSO-05JEFRSO 765.0/345.0 kV Ckt 2 transformer | AEP_P4_#6189_05HANG R 765_D1_SRT-A | Breaker | AC | 112.15 % | 3276.0 | B | 3674.0 | 0.91 | |
| GD2 | AEP | 05JEFRSO-05JEFRSO 765.0/345.0 kV Ckt 2 transformer | AEP_P1-2_#709_546_SRT-A | Single | AC | 110.76 % | 3276.0 | B | 3628.46 | 0.92 | |
| GD2 | AEP | 05JEFRSO-05JEFRSO 765.0/345.0 kV Ckt 2 transformer | AEP_P4_#709_05HANG R 765_D2_SRT-A | Breaker | AC | 110.76 % | 3276.0 | B | 3628.46 | 0.92 | |
| GD2 | AEP/OVEC | 05JEFRSO-06CLIFTY 345.0 kV Ckt 1 line | AEP_P4_#6189_05HANG R 765_D1_SRT-A | Breaker | AC | 121.71 % | 2991.0 | B | 3640.25 | 0.91 | |
| GD2 | AEP/OVEC | 05JEFRSO-06CLIFTY 345.0 kV Ckt 1 line | AEP_P4_#709_05HANG R 765_D2_SRT-A | Breaker | AC | 120.0 % | 2991.0 | B | 3589.25 | 0.92 | |
| GD2 | AEP/OVEC | 05JEFRSO-06CLIFTY 345.0 kV Ckt 1 line | AEP_P1-2_#709_546_SRT-A | Single | AC | 120.0 % | 2991.0 | B | 3589.24 | 0.92 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P4_#7334_05JEFRSO 765_A2_SRT-A | Breaker | AC | 114.0 % | 4961.0 | B | 5655.61 | 2.37 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P4_#6189_05HANG R 765_D1_SRT-A | Breaker | AC | 104.24 % | 4961.0 | B | 5171.46 | 2.19 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P4_#709_05HANG R 765_D2_SRT-A | Breaker | AC | 102.76 % | 4961.0 | B | 5098.14 | 2.2 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P1-2_#709_546_SRT-A | Single | AC | 102.76 % | 4961.0 | B | 5098.11 | 2.2 | |
| GD2 | AEP | 05MARYSVL_RS-05MARYSV 765.0 kV Ckt Z1 line | AEP_P4_#1760_05JEFRSO 765_A_SRT-A | Breaker | AC | 100.41 % | 4961.0 | B | 4981.37 | 2.32 | |
| GD2 | AEP | 05RPMONE-AG1-410 TP 345.0 kV Ckt 1 line | AEP_P4_#7445_05MARYSV 765_B_SRT-A | Breaker | AC | 103.24 % | 2219.0 | B | 2290.85 | 0.81 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P4_006-45-BT3-8___SRT-A | Breaker | AC | 101.03 % | 1912.0 | STE | 1931.75 | 5.86 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P4_006-45-BT3-4___SRT-A | Breaker | AC | 100.75 % | 1912.0 | STE | 1926.37 | 5.85 | |
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | COMED_P1-2_345-L0627__B-R_SRT-A | Single | AC | 100.59 % | 1912.0 | STE | 1923.25 | 5.85 | |
| GD2 | AEP | AG1-410 TP-05MADDOX 345.0 kV Ckt 1 line | AEP_P4_#7445_05MARYSV 765_B_SRT-A | Breaker | AC | 105.42 % | 2219.0 | B | 2339.21 | 0.81 | |
| GD2 | AEP | AG1-410 TP-05MADDOX 345.0 kV Ckt 1 line | AEP_P4_#7441_05SORENS 765_J1_SRT-A | Breaker | AC | 102.19 % | 2219.0 | B | 2267.59 | 0.81 | |
| GD2 | AEP | AG1-410 TP-05MADDOX 345.0 kV Ckt 1 line | AEP_P1-2_#7441_100545_SRT-A | Single | AC | 102.19 % | 2219.0 | B | 2267.56 | 0.81 | |
| GD2 | AEP | AG1-410 TP-05MADDOX 345.0 kV Ckt 1 line | AEP_P4_#7446_05MARYSV 765_B2_SRT-A | Breaker | AC | 101.94 % | 2219.0 | B | 2262.15 | 0.78 | |
| IPD | CE | ELECT JCT;1B-ELECT JCT;1M 345.0/138.0 kV Ckt 1 transformer | COMED_P4_111-45-L16704T_SRT-A | Breaker | AC | 101.88 % | 480.0 | B | 489.01 | 21.96 | |
| IPD | CE | ELECT JCT;1M-ELECT JCT;1B 138.0 kV Ckt 1 line | COMED_P4_111-45-L16704T_SRT-A | Breaker | AC | 101.88 % | 480.0 | B | 489.01 | 21.96 |
Light Load Analysis
The New Service Request AH1-150 was evaluated as a 200.0 MW injection
AH1-150 was evaluated as part of a plant. The plant consists of AH1-150, AG2-660, AH1-151, AH1-044. The total Energy output of the plant was evaluated at its maximum seasonal capability of 1200.0 MW (650.0 MW under study).
Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.
| Study | Area | Facility Description | Contingency Name | Contingency Type | DC|AC | Final Cycle Loading | Rating (MVA) | Rating Type | MVA to Mitigate | MW Contribution | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| GD2 | CE | AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line | Base Case | Single | AC | 104.17 % | 1553.0 | A | 1617.79 | 59.04 | |
| GD2 | CE | STEWARD ; B-HAUMESSER; B 138.0 kV Ckt 1 line | COMED_P4-6_111-345-B______SRT-A | Breaker | AC | 112.83 % | 468.0 | STE | 528.05 | 2.42 | |
| GD2 | CE | STEWARD ; B-HAUMESSER; B 138.0 kV Ckt 1 line | COMED_P1-2_345-L15502_B-R_SRT-A-2 | Single | AC | 111.35 % | 468.0 | STE | 521.14 | 2.45 | |
| GD2 | CE | WATERMAN ; R-SANDWICH ; R 138.0 kV Ckt 1 line | COMED_P7-1_138-L11106_B-R_+_345-L93407_B-R_SRT-A-2 | Tower | AC | 117.49 % | 423.0 | ALDR | 496.97 | 0.38 | |
| GD2 | CE | WATERMAN ; R-SANDWICH ; R 138.0 kV Ckt 1 line | COMED_P7-1_138-L11106_B-R_+_345-L93407_B-R_SRT-A-1 | Tower | AC | 103.55 % | 423.0 | ALDR | 438.01 | 1.44 | |
| GD2 | CE | WATERMAN ; R-SANDWICH ; R 138.0 kV Ckt 1 line | COMED_P4-6_111-345-B______SRT-A | Breaker | AC | 101.87 % | 347.0 | STE | 353.48 | 1.28 |
Short Circuit Analysis
Short Circuit analysis is not performed as part of the Phase I System Impact Study. Short Circuit analysis will commence in the Phase II System Impact Study.
Stability Analysis
Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.
Reactive Power Analysis
Reactive Power analysis is not performed as part of the Phase I System Impact Study. Reactive Power analysis will commence in the Phase II System Impact Study.
Steady-State Voltage Analysis
Steady State Voltage Analysis is Not Required.
New Service Request Dependencies
The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.
| New Service Requests Dependencies | ||
|---|---|---|
| Project ID | Project Name | Status |
| AA1-018 | Powerton-Goodings Grove | In Service |
| AA1-038 | Lexington-Low Moor 230kV | Under Construction |
| AA1-050 | Tarboro-Everetts 230kV | In Service |
| AA1-095 | Halfway-Marlowe 34.5kV | In Service |
| AA1-139 | Hickory-Shawboro 230kV | In Service |
| AA1-146 | Nelson | In Service |
| AA2-030 | Nelson | In Service |
| AA2-184 | Atlantic-Red Bank 34kV | In Service |
| AB1-001 | Absecon 12 kV | In Service |
| AB1-006 | Meadow Lake 345kV | In Service |
| AB1-027 | Old Church 34.5 KV | In Service |
| AB1-081 | Anaconda-Mayo Dunbar 115kV | In Service |
| AB1-087 | Sullivan 345kV #1 | Under Construction |
| AB1-088 | Sullivan 345kV #2 | Engineering & Procurement |
| AB1-096 | Carroll-Mt. Airy 34.5kV | In Service |
| AB1-124 | Carroll-Monocacy 34.5kV | Partially in Service - Under Construction |
| AB1-125 | Carroll-Monocacy 34.5kV | In Service |
| AB1-127 | St. Thomas-Guilford 34.5kV | In Service |
| AB1-128 | St. Thomas-Mercersburg 34.5kV | In Service |
| AB1-138 | Navy 34.5kV | In Service |
| AB1-139 | Metuchen 26kV | In Service |
| AB1-141 | Church-Wye Mills 138 kV I | In Service |
| AB1-142 | Church-Wye Mills 138 kV II | In Service |
| AB1-150 | Grassy Falls 138kV | In Service |
| AB1-176 | Price 25kV II | Engineering & Procurement |
| AB1-180 | Pine View 12kV | In Service |
| AB2-022 | Elizabeth City 34.5kV | In Service |
| AB2-025 | Sapony 34.5kV | In Service |
| AB2-026 | Powhatan 34.5kV | In Service |
| AB2-029 | Remington 34.5kV | In Service |
| AB2-032 | Church-Wye Mills 138 kV | In Service |
| AB2-037 | Keeney-Steele 230kV | Under Construction |
| AB2-045 | Buckingham 34.5kV | In Service |
| AB2-049 | Gloucester Township 12kV | In Service |
| AB2-059 | Benson-Dunbar 115kV | In Service |
| AB2-060 | Chase City-Lunenburg 115kV | In Service |
| AB2-067 | Kammer-Vassell 765kV | In Service |
| AB2-070 | Mt. Pulaski-Brokaw | In Service |
| AB2-077 | Buggs Island-Chase City 115kV | In Service |
| AB2-078 | Buggs Island-Chase City 115kV | In Service |
| AB2-079 | Buggs Island-Chase City 115kV | In Service |
| AB2-133 | Chestertown 69kV | Under Construction |
| AB2-134 | Hopewell-Surry 230kV | In Service |
| AB2-135 | Church-Kent 69kV | In Service |
| AB2-136 | Cambridge-West Cambridge 69kV | Under Construction |
| AB2-153 | Church-Wye Mills 138 kV | In Service |
| AB2-158 | Louisa-South Anna 230kV | In Service |
| AB2-170 | East Lima-Marysville 345kV | In Service |
| AB2-179 | Townsend 138kV | In Service |
| AB2-190 | Hopewell-Surry 230kV | In Service |
| AC1-001 | Delano 138kV | In Service |
| AC1-010 | Gloucester 26kV | Under Construction |
| AC1-017 | Levittown 13 kV | In Service |
| AC1-027 | Pendleton 34.5kV | In Service |
| AC1-030 | Cinnaminson 13kV | In Service |
| AC1-033 | Kewanee 138 kV | In Service |
| AC1-034 | Heartsease DP - Mayo Dunbar 115kV | Suspended |
| AC1-036 | Twittys Creek 34.5kV | In Service |
| AC1-042 | Altavista-Mt. Airy 69kV | In Service |
| AC1-044 | Kammer-Vassell 765kV | In Service |
| AC1-053 | Lanesville-Brokaw | Partially in Service - Under Construction |
| AC1-054 | Kerr Dam–Eatons Ferry 115 kV | In Service |
| AC1-068 | Atlanta 69kV I | In Service |
| AC1-069 | Atlanta 69kV II | In Service |
| AC1-074 | Jacksonville-Renaker 138kV I | In Service |
| AC1-075 | Perth-Hickory Grove 115kV | In Service |
| AC1-076 | Locust Grove-Paytes 115kV | In Service |
| AC1-078 | Beatty-London 138kV | In Service |
| AC1-082 | Ravenswood-Hemlock 69kV | Under Construction |
| AC1-085 | Stuart-Clinton 345kV | In Service |
| AC1-089 | Hillsboro-Wildcat 138kV | In Service |
| AC1-091 | Cedar Creek 138kV I | Engineering & Procurement |
| AC1-092 | Cedar Creek 138kV II | Engineering & Procurement |
| AC1-093 | Cedar Creek 138kV III | Engineering & Procurement |
| AC1-094 | Cedar Creek 138kV IV | Engineering & Procurement |
| AC1-101 | Johns Creek-Excel 138kV I | Suspended |
| AC1-102 | Johns Creek-Excel 138kV II | Suspended |
| AC1-105 | Halifax-Mt. Laurel 115kV | In Service |
| AC1-111 | Aurora 138kV | In Service |
| AC1-118 | Westmoreland 34.5kV | In Service |
| AC1-120 | Mitchell-Mountain Run 115kV | Engineering & Procurement |
| AC1-121 | Mitchell-Mountain Run 115kV | Engineering & Procurement |
| AC1-122 | Smith Mountain-Candler's Mountain 138kV | In Service |
| AC1-141 | Cook-East Elkhart 345kV | In Service |
| AC1-145 | Gretna DP 69 kV | In Service |
| AC1-147 | Grassfield 34.5kV | In Service |
| AC1-158 | Spotsylvania 500kV | In Service |
| AC1-161 | Septa 500kV | In Service |
| AC1-165 | Atlanta 69kV III | In Service |
| AC1-166 | Atlanta 69kV IV | In Service |
| AC1-167 | Mark Center 69kV | Under Construction |
| AC1-168 | Kewanee-Streator | Suspended |
| AC1-174 | Losantville 345kV | In Service |
| AC1-175 | Losantville 345kV | In Service |
| AC1-188 | Rio-Lick 138kV | Engineering & Procurement |
| AC1-191 | Elmont 115kV | Engineering & Procurement |
| AC1-194 | Elk 138kV | Active |
| AC1-214 | Crescent Ridge | In Service |
| AC1-221 | Halifax-Person 230kV | In Service |
| AC1-222 | Crystal Hill-Halifax 115kV | In Service |
| AC2-012 | Grassfield-Great Bridge 115kV | In Service |
| AC2-015 | Chatfield-Howard 138kV | Partially in Service - Under Construction |
| AC2-023 | Hebron 69kV | Engineering & Procurement |
| AC2-029 | Circleville 138kV | Suspended |
| AC2-044 | Maddox Creek 345kV | Suspended |
| AC2-059 | Biers Run-Circleville 138kV | In Service |
| AC2-060 | Buckskin 69kV | In Service |
| AC2-061 | Hillsboro-Clinton 138kV | In Service |
| AC2-067 | Camden-Crystal I 69kV | Engineering & Procurement |
| AC2-068 | Camden-Crystal II 69kV | Engineering & Procurement |
| AC2-075 | Jacksonville-Renaker 138 kV | In Service |
| AC2-088 | S. Bethel-Brown 69kV | In Service |
| AC2-090 | Losantville 345kV | In Service |
| AC2-100 | Halifax-Person 230kV | In Service |
| AC2-103 | Beaver-Davis Besse 345 kV I | Engineering & Procurement |
| AC2-111 | College Corner 138kV | Engineering & Procurement |
| AC2-136 | East Hagerstown 12kV | Under Construction |
| AC2-137 | Elko 34.5kV | In Service |
| AC2-138 | Northern Neck 34.5kV | In Service |
| AC2-141 | Septa 500kV | Engineering & Procurement |
| AC2-154 | Davis Creek 138kV | Engineering & Procurement |
| AC2-157 | Sullivan 345 kV | Under Construction |
| AC2-165 | Bremo-Powhatan 230kV | Suspended |
| AC2-168 | Clinton 23kV | In Service |
| AC2-176 | Jay 138 kV | In Service |
| AC2-186 | Harrington 25kV | Under Construction |
| AC2-187 | Harrington 69kV | Under Construction |
| AC2-188 | Harrington 69 kV | Under Construction |
| AC2-195 | Galion-Roberts South 138 kV | Under Construction |
| AD1-013 | Twombly Road 138kV | Engineering & Procurement |
| AD1-017 | Smith Mountain-Bearskin 138 kV | In Service |
| AD1-020 | Hunterstown-Lincoln 115 kV | In Service |
| AD1-025 | Hopewell-Surry 230 kV | Under Construction |
| AD1-033 | Fentress-Landstown 230 kV | In Service |
| AD1-041 | Harmony Village-Shackleford 115 kV | In Service |
| AD1-060 | Mercersburg-Milnor 34.5 kV | In Service |
| AD1-061 | McConnelsburg-Mercersburg 34 kV | In Service |
| AD1-063 | Harmony Village 34.5 kV | In Service |
| AD1-082 | Bakers Pond-Ivor 115kV | In Service |
| AD1-087 | Clover-Sedge Hill 230 kV | In Service |
| AD1-100 | Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV | Under Construction |
| AD1-101 | Continental 69 kV | In Service |
| AD1-105 | Kings Dominion DP 115 kV | Under Construction |
| AD1-106 | North Waldo-Wild Creek 138 kV | Suspended |
| AD1-115 | Mountain Run-Mitchell 115 kV | Engineering & Procurement |
| AD1-119 | Payne 69 kV | In Service |
| AD1-128 | Modoc-Delaware 138 kV | Partially in Service - Under Construction |
| AD1-130 | Hardin Switch 345 kV | In Service |
| AD1-136 | South Bethel-Brown 69 kV | In Service |
| AD1-140 | Greene-Clark 138 kV | Engineering & Procurement |
| AD1-144 | Kings Fork 34.5 kV | In Service |
| AD1-152 | Clover-Sedge Hill 230 kV | In Service |
| AD1-155 | Meadow Brook-Strasburg 138 kV | In Service |
| AD2-009 | McConnellsburg 138 kV | In Service |
| AD2-016 | Biers Run-Circleville 138 kV | In Service |
| AD2-020 | Valley 138 kV | Engineering & Procurement |
| AD2-027 | Camden Switch 26 kV | In Service |
| AD2-030 | Wan 34.5 kV | In Service |
| AD2-031 | Martinsville-Wilmington 69 kV | In Service |
| AD2-033 | Chase City-Lunenburg 115 kV | Under Construction |
| AD2-038 | Powerton-Nevada 345 kV | Under Construction |
| AD2-042 | Camden Switch 26 kV II | In Service |
| AD2-047 | Davis Creek 138 kV | Suspended |
| AD2-048 | Cynthia-Headquarters 69 kV | Under Construction |
| AD2-060 | Davis Creek 138kV | Engineering & Procurement |
| AD2-065 | Atco 12 kV | In Service |
| AD2-066 | Mazon-Crescent Ridge 138 kV | Engineering & Procurement |
| AD2-067 | Centerburg 138kV | Engineering & Procurement |
| AD2-070 | Gilbert-Morris Park 34.5kV | In Service |
| AD2-071 | Strawton-Deer Creek 138 kV | Suspended |
| AD2-073 | Sanders DP 230 kV | In Service |
| AD2-074 | Garner DP-Lancaster 115 kV | Engineering & Procurement |
| AD2-079 | Capitol Ave 34.5kV | In Service |
| AD2-085 | Myrtle-Windsor DP 115kV | Engineering & Procurement |
| AD2-086 | Hardin Switch 345 kV | In Service |
| AD2-091 | Hardin Tap 345kV | Suspended |
| AD2-092 | Marysville 345kV | Under Construction |
| AD2-093 | Marysville 345kV | Under Construction |
| AD2-096 | Marysville 345kV | Suspended |
| AD2-100 | Kincaid-Pana 345 kV | Suspended |
| AD2-115 | Lyons-Moselem 69kV | In Service |
| AD2-116 | Hokes-Grantley 69 kV | In Service |
| AD2-131 | Kincaid-Pana 345kV | Suspended |
| AD2-133 | Eagle Valley 115kV | In Service |
| AD2-134 | Shady Oaks | Partially in Service - Under Construction |
| AD2-135 | Williamstown 12kV | Partially in Service - Under Construction |
| AD2-160 | Hickory-Moyock 230kV | In Service |
| AD2-163 | Broadview-Tangy 138 kV | In Service |
| AD2-172 | Lena 138kV | In Service |
| AD2-179 | Morgans Cut-Glen Lyn 138kV | Suspended |
| AD2-180 | Elk Garden-Parr Run 138kV | In Service |
| AD2-194 | Elwood 345 kV | Partially in Service - Under Construction |
| AD2-202 | Clover-Sedge Hill 230kV | In Service |
| AE1-040 | Greenfield 69 kV | In Service |
| AE1-041 | Edison 4kV | In Service |
| AE1-071 | Shade Gap-Roxbury 115 kV | In Service |
| AE1-072 | Shawboro-Sligo 230 kV | Under Construction |
| AE1-074 | Winterpock 34.5 kV | Under Construction |
| AE1-075 | Powhatan 34.5 kV | In Service |
| AE1-079 | Maysville-Sharon 69 kV | Under Construction |
| AE1-081 | Landing 12.47 kV | In Service |
| AE1-090 | Hardin Switch 345 kV | In Service |
| AE1-091 | West Newton-Lynn 138 kV | Suspended |
| AE1-092 | Blue Jacket-Kirby 138 kV | Active |
| AE1-100 | Axton 138 kV | In Service |
| AE1-101 | McConnellsburg-Texas Eastern 138 kV | In Service |
| AE1-102 | Maddox Creek 345 kV | Suspended |
| AE1-109 | Frenchs Mill 34 kV | In Service |
| AE1-113 | Mole Creek 345 kV | Engineering & Procurement |
| AE1-114 | Maryland-Lancaster 138 kV | Active |
| AE1-142 | Manitou-Pleasant Plains 34.5 kV | In Service |
| AE1-143 | Marion County 161 kV | Engineering & Procurement |
| AE1-146 | Ebersole #2-Fostoria Central 138 kV | Under Construction |
| AE1-155 | Garner-Northern Neck 115 kV | In Service |
| AE1-156 | Quakertown Solar II 34.5 kV | Partially in Service - Under Construction |
| AE1-162 | Smithfield 34.5 kV | In Service |
| AE1-163 | Powerton-Nevada 345 kV | Engineering & Procurement |
| AE1-166 | Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV | Engineering & Procurement |
| AE1-170 | Kenzie Creek-Colby 138 kV | Suspended |
| AE1-172 | Loretto-Wilton Center | Active |
| AE1-175 | Light Foot 34.5 kV | In Service |
| AE1-176 | Roanoke-Vinton 12 kV (Niagara Hydro) | In Service |
| AE1-183 | Maysville-McDowell 69 kV | Engineering & Procurement |
| AE1-185 | Hokes-Jackson 69 kV | In Service |
| AE1-190 | Harmony Village-Shackleford 115 kV | Partially in Service - Under Construction |
| AE1-191 | Harmony Village-Shackleford 115 kV | Partially in Service - Under Construction |
| AE1-196 | Hokes-Jackson 69 kV II | In Service |
| AE1-205 | McLean 345 kV | Engineering & Procurement |
| AE1-207 | Mississinewa-Gaston 138 kV | Suspended |
| AE1-208 | Delaware-Van Buren 138 kV | Suspended |
| AE1-209 | Desoto 345 kV | Suspended |
| AE1-210 | Desoto 345 kV | Suspended |
| AE1-212 | Grandview-Clifftop 138 kV | Suspended |
| AE1-229 | Deepwater-Upper Pittsgrove 138 kV | Suspended |
| AE1-237 | Andover (Maysville) 69kV I | Under Construction |
| AE1-245 | Haviland 138 kV | Under Construction |
| AE1-250 | Smith Mountain-E. Danville 138 kV | Engineering & Procurement |
| AE2-029 | Grottoes-Merck 115kV | Under Construction |
| AE2-035 | Lena 138 kV | In Service |
| AE2-042 | Milton 69 kV | In Service |
| AE2-045 | Olive-Reynolds 345 kV | Engineering & Procurement |
| AE2-047 | Ridgeway-Solite 69 kV | Engineering & Procurement |
| AE2-054 | Warfordsburg 34 kV | In Service |
| AE2-059 | Derry Tap-Derry Bus 69 kV | In Service |
| AE2-060 | Mifflintown Bus-Mifflintown Tap 69 kV | In Service |
| AE2-071 | Patton Rd-Summer Shade 69 kV | In Service |
| AE2-072 | East Leipsic-Richland 138 kV | In Service |
| AE2-089 | Pennville-Adams 138 kV | Engineering & Procurement |
| AE2-092 | Kidds Store-Sherwood 115 kV | Engineering & Procurement |
| AE2-113 | Farmers Valley-Ridgeway 115 kV | Under Construction |
| AE2-114 | Midland 23 kV I | In Service |
| AE2-115 | Midland 23 kV II | In Service |
| AE2-117 | ABW Tap-Alexandria 46 kV | Suspended |
| AE2-125 | Stahlstown-Ligonier 25 kV | In Service |
| AE2-126 | Dubois-Curwensville 34.5 kV | In Service |
| AE2-129 | Philipsburg-Clarence 34.5 kV | In Service |
| AE2-131 | Philipsburg-Karthaus 34.5 | Under Construction |
| AE2-133 | Penns Tap-Richfield Tie 69 kV | In Service |
| AE2-139 | East Towanda-Grover 230 kV | Engineering & Procurement |
| AE2-140 | Axton-Danville 138 kV | Suspended |
| AE2-148 | Beatty-Greene 345 kV | In Service |
| AE2-152 | Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV | Engineering & Procurement |
| AE2-160 | Kanawha River 138 kV | Engineering & Procurement |
| AE2-166 | Stockton 138 kV | Suspended |
| AE2-169 | Delaware-Van Buren 138 kV | Suspended |
| AE2-172 | Mississinewa-Gaston 138 kV | Suspended |
| AE2-173 | McLean 345 kV | Active |
| AE2-175 | Jackson-Long Pond 69 kV | Partially in Service - Under Construction |
| AE2-176 | Groton 138 kV Solar | In Service |
| AE2-181 | Snyder 69kV | Under Construction |
| AE2-185 | Gladys DP-Stonemill Switching Station 69 kV | Active |
| AE2-187 | Shockoe DP-Chatham 69 kV | Active |
| AE2-206 | East Sidney-Quincy 138 kV | In Service |
| AE2-212 | Harrowgate 34 kV | Engineering & Procurement |
| AE2-214 | Cole 345 kV | Engineering & Procurement |
| AE2-216 | Hardin Switch 345 kV | Engineering & Procurement |
| AE2-217 | East Springfield-London 138 kV | Engineering & Procurement |
| AE2-219 | Bluff Point-Randolph 138 kV | Suspended |
| AE2-220 | Losantville 345 kV | Engineering & Procurement |
| AE2-221 | Clinton-Stuart 345 kV | Under Construction |
| AE2-223 | McLean 345 kV | Active |
| AE2-224 | Bear Rock-Johnstown 230 kV | In Service |
| AE2-226 | Millville-Old Chapel 138 kV | Engineering & Procurement |
| AE2-230 | Bartonsville-Meadow Brook 138 kV | In Service |
| AE2-234 | Liberty Center-Buckeye Tap 69 kV | Engineering & Procurement |
| AE2-236 | Columbia-Northeast 138 kV | Suspended |
| AE2-253 | Hickory-Moyock 230 kV | In Service |
| AE2-254 | Garrard County-Tommy-Gooch 69 kV | In Service |
| AE2-255 | Molecreek 345 kV | Engineering & Procurement |
| AE2-259 | Curdsville-Willis Mtn 115 kV | Engineering & Procurement |
| AE2-261 | Kincaid-Pana 345 kV | Active |
| AE2-262 | Moshannon-Milesburg 230 kV | Engineering & Procurement |
| AE2-263 | Moshannon-Milesburg 230 kV II | Engineering & Procurement |
| AE2-267 | Woodsdale 345 kV | Engineering & Procurement |
| AE2-276 | Sullivan 345kV | Engineering & Procurement |
| AE2-281 | Powerton-Nevada 345 kV | Engineering & Procurement |
| AE2-282 | East Fayette 138 kV | In Service |
| AE2-283 | Gladys-Stone Mill 69 kV | Active |
| AE2-285 | Maysville 69 kV | Engineering & Procurement |
| AE2-291 | Grit DP-Perth 115 kV | Active |
| AE2-297 | Madison-Tanners Creek 138 kV | In Service |
| AE2-305 | Givens-Mechanicsburg 138 kV | Engineering & Procurement |
| AE2-306 | Gunn Road 345 kV | Under Construction |
| AE2-308 | Three Forks-Dale 138 kV | Active |
| AE2-309 | Carlos Junction-Lonaconing 34.5 kV | In Service |
| AE2-315 | Yankee Tap 69 kV | In Service |
| AE2-318 | Ford-Cedarville 138 kV | Suspended |
| AE2-321 | Belvidere-Marengo 138 kV | Active |
| AE2-323 | Twin Branch-Guardian 138 kV | Under Construction |
| AE2-325 | Valley 138 kV | Active |
| AE2-326 | Jacksons Ferry 138 kV | Engineering & Procurement |
| AE2-339 | Avon 138 kV | Engineering & Procurement |
| AE2-341 | Sandwich-Plano 138 kV | Active |
| AE2-342 | Woodstock 69 kV | Engineering & Procurement |
| AE2-343 | Andover (Maysville) 69 kV II | Under Construction |
| AF1-006 | Fairview East 34.5 kV | In Service |
| AF1-007 | Indian River 230 kV I | Suspended |
| AF1-021 | Bethelboro-Connellsville #1 25 kV | In Service |
| AF1-022 | Lake Lynn-Uniontown 25 kV | In Service |
| AF1-030 | Sandwich-Plano 138 kV | Active |
| AF1-032 | Suffolk 34.5 kV | In Service |
| AF1-038 | Sewellton Jct-Webbs Crossroads 69 kV | Engineering & Procurement |
| AF1-039 | Listonburg-Highpoint 24.9 kV | In Service |
| AF1-042 | Garner DP-Lancaster 115 kV | Engineering & Procurement |
| AF1-045 | Cedarville-Ford 138 kV | Suspended |
| AF1-049 | Berry Hill 138 kV | Under Construction |
| AF1-050 | Summer Shade - Green County 161 kV | Engineering & Procurement |
| AF1-051 | Gavin 765 kV | In Service |
| AF1-053 | Givens-Mechanicsburg 138 kV | Engineering & Procurement |
| AF1-054 | Givens-Mechanicsburg 138 kV | Engineering & Procurement |
| AF1-058 | Welco 34.5 kV | In Service |
| AF1-062 | Jug Street 138 kV | Engineering & Procurement |
| AF1-064 | Weston 69 kV | Under Construction |
| AF1-071 | College Corner 138 kV | Engineering & Procurement |
| AF1-078 | East Sidney-Quincy 138 kV | In Service |
| AF1-083 | Green County-Saloma 161 kV | Engineering & Procurement |
| AF1-084 | Hartford-Almena 69 kV | Engineering & Procurement |
| AF1-086 | Madera-Westover South 115 kV | Under Construction |
| AF1-088 | Sullivan 345 kV | Active |
| AF1-090 | Kincaid-Pana | Engineering & Procurement |
| AF1-091 | Varner - Sowers 138 kV | Engineering & Procurement |
| AF1-092 | Huntington Jct. 138 kV | Suspended |
| AF1-093 | Henderson-Stoneboro 69 kV | Engineering & Procurement |
| AF1-094 | Union City-Cambridge Springs 34.5 kV | Engineering & Procurement |
| AF1-098 | Four Mile Jct-Corry East 115 kV | Engineering & Procurement |
| AF1-118 | Sorenson-Desoto 345 kV | Engineering & Procurement |
| AF1-119 | Keystone-Desoto 345 kV | Engineering & Procurement |
| AF1-120 | East Fayette 2 138 kV | In Service |
| AF1-130 | Inez 138 kV | Suspended |
| AF1-134 | Philipsburg-Madera 34.5 kV | Engineering & Procurement |
| AF1-136 | Warfordsburg-Purcell Junction 34.5 kV | Engineering & Procurement |
| AF1-140 | Claysburg 23 kV | Engineering & Procurement |
| AF1-143 | Lick Run 115 kV | Engineering & Procurement |
| AF1-153 | Motion-Ridgeway 46 kV | Suspended |
| AF1-158 | Edison-Gravel Pit 138 kV | In Service |
| AF1-161 | Valley 138 kV | Active |
| AF1-162 | Inez 138 kV | Engineering & Procurement |
| AF1-176 | Corey 138 kV | Active |
| AF1-202 | Keystone-Desoto 345 kV | Under Construction |
| AF1-203 | Patton Rd-Summer Shade 69 kV | In Service |
| AF1-204 | Eugene 345 kV | Active |
| AF1-205 | Napoleon Muni 138 kV | Suspended |
| AF1-206 | East Fayette 138 kV | Engineering & Procurement |
| AF1-207 | Reynolds-Olive #1 345 kV | Engineering & Procurement |
| AF1-215 | Olive-Reynolds 345 kV | In Service |
| AF1-223 | Keystone-Desoto 345 kV | Under Construction |
| AF1-227 | Marysville – Gunn Road 345 kV | In Service |
| AF1-228 | Beatty-Greene 345 kV | Engineering & Procurement |
| AF1-229 | Galion-South Berwick 345 kV | Engineering & Procurement |
| AF1-233 | Flemingsburg – Spurlock 138kV | Active |
| AF1-249 | Nickel 12.47 kV | In Service |
| AF1-254 | Milnor-Huyetts 34.5 kV | Under Construction |
| AF1-262 | Upper Pittsgrove 12 kV | In Service |
| AF1-264 | Runnemede 13 kV | In Service |
| AF1-268 | Desoto-Jay 138 kV | Engineering & Procurement |
| AF1-272 | Lucerne 115 kV | Engineering & Procurement |
| AF1-275 | Cole 345 kV | Engineering & Procurement |
| AF1-282 | Stuart-Clinton 345 kV | Engineering & Procurement |
| AF1-283 | Stuart-Clinton 345 kV | Engineering & Procurement |
| AF1-285 | Gunn Road 345 kV | Under Construction |
| AF1-290 | Feagans Mill-Millville 138 kV | In Service |
| AF1-291 | Tyler 34.5 kV | Engineering & Procurement |
| AF1-291A | Bartonsville-Meadow Brook 138 kV | In Service |
| AF1-296 | Garden Plain 138 kV | Active |
| AF1-299 | Otter Point 34.5 kV I | In Service |
| AF1-300 | Otter Point 34.5 kV II | In Service |
| AF1-302 | Brookville-Squab Hollow 138 kV | Engineering & Procurement |
| AF1-320 | Merrill Creek 115 kV | Engineering & Procurement |
| AF1-322 | Meadow Lake 345 kV | Engineering & Procurement |
| AF1-331 | Twombley Road | Engineering & Procurement |
| AF1-333 | Laurelton-Mifflinburg 69 kV | Engineering & Procurement |
| AF1-337 | Laurelton-Mifflinburg 69 kV | Engineering & Procurement |
| AF1-338 | Laurelton-Mifflinburg 69 kV | Engineering & Procurement |
| AF1-339 | Laurelton-Mifflinburg 69 kV | Engineering & Procurement |
| AF2-008 | Sullivan 345 kV | Active |
| AF2-014 | Maddox Creek 345 kV | Engineering & Procurement |
| AF2-018 | Inez 138 kV | Engineering & Procurement |
| AF2-031 | Calumet | Engineering & Procurement |
| AF2-032 | Kincaid 345 kV | Engineering & Procurement |
| AF2-039 | Shawville-Clearfield 34.5 kV | Engineering & Procurement |
| AF2-041 | Nelson-Electric Junction 345 kV | Active |
| AF2-043 | Suffolk 34.5 kV | In Service |
| AF2-048 | Rio-Lick 138 kV | Engineering & Procurement |
| AF2-054 | Wan 34.5 kV | In Service |
| AF2-068 | Jay 138 kV | Active |
| AF2-069 | Crescent Ridge 138 kV | Active |
| AF2-075 | Bartonsville-Meadow Brook 138 kV III | In Service |
| AF2-077 | White Marsh 34.5 kV | In Service |
| AF2-078 | Reynolds-Olive #1 345 kV | Engineering & Procurement |
| AF2-083 | Kenzie Creek-Stone Lake 69 kV | Under Construction |
| AF2-086 | Scott Tap-Bowmans Mill Tap 69 kV | Engineering & Procurement |
| AF2-088 | Shawville-Clearfield 34.5 kV II | Engineering & Procurement |
| AF2-095 | Davis Creek 138 kV | Active |
| AF2-106 | Hazel Hollow-Glen Lyn #1 138 kV | Engineering & Procurement |
| AF2-107 | Clifford 138 kV | Engineering & Procurement |
| AF2-111 | North Clark-Spurlock 345 kV | Active |
| AF2-122 | Kirk 138 kV | Under Construction |
| AF2-126 | Weston 69 kV II | Active |
| AF2-130 | Cobalt Corners 34.5 kV | In Service |
| AF2-132 | Reynolds-Olive #1 345 kV | Under Construction |
| AF2-133 | Reynolds-Olive #2 345 kV | Under Construction |
| AF2-134 | Olive-Reynolds #2 345 kV | In Service |
| AF2-138 | Flanders-West Wharton 34.5 kV | In Service |
| AF2-139 | Gilbert-Warren Glen 34.5 kV | In Service |
| AF2-142 | Nevada 345 kV | Active |
| AF2-143 | Powerton-Nevada 345 kV | Active |
| AF2-144 | Powhatan 34.5 kV | In Service |
| AF2-149 | Sharp Road 69 kV | Engineering & Procurement |
| AF2-150 | Galion 138 kV | Under Construction |
| AF2-162 | Keystone-Desoto 345 kV | Engineering & Procurement |
| AF2-173 | Desoto 345 kV | Active |
| AF2-177 | Sorenson-DeSoto #2 345 kV | Active |
| AF2-187 | Brookside-Cloverdale 138 kV | Engineering & Procurement |
| AF2-192 | Frenchtown Solar-West Flemington 34.5 kV | Suspended |
| AF2-199 | Nelson-Electric Junction 345 kV | Active |
| AF2-200 | Nelson-Electric Junction 345 kV | Active |
| AF2-205 | Olive-Reynolds #2 345 kV | Engineering & Procurement |
| AF2-224 | Allen 345 kV | Engineering & Procurement |
| AF2-225 | McLean 345 kV | Active |
| AF2-226 | Katydid Road 345 kV | Active |
| AF2-229 | Roxbury 23 kV | Engineering & Procurement |
| AF2-233 | Penns-Richfield Tie #1 69 kV | Engineering & Procurement |
| AF2-234 | Sunbury Yard #1-Richfield Tie #2 69 kV | Engineering & Procurement |
| AF2-235 | Titusville-Oil Creek 34.5 kV | Withdrawn |
| AF2-238 | Mansfield-South Troy 34.5 kV | Engineering & Procurement |
| AF2-247 | Bustleton 13.2 kV | In Service |
| AF2-250 | Edgewood 12 kV III | In Service |
| AF2-252 | Blue Mound 345 kV | Engineering & Procurement |
| AF2-291 | Sporn South-Leon 138 kV | Engineering & Procurement |
| AF2-298 | Crown-New Lebanon 69 kV | Engineering & Procurement |
| AF2-307 | Hope-Belvins Valley Tap 69 kV | Active |
| AF2-311 | Gilboa-Jones Branch 138 kV | Engineering & Procurement |
| AF2-316 | Gilboa-Jones Branch 138 kV II | Engineering & Procurement |
| AF2-319 | Katydid Road 345 kV | Active |
| AF2-325 | Jacktown 12 kV | Engineering & Procurement |
| AF2-335 | Delaware-Royerton 138 kV | Active |
| AF2-350 | Kensington 138 kV | Active |
| AF2-352 | Blue Mound 345 kV | Engineering & Procurement |
| AF2-354 | Washington 34.5 kV II | Engineering & Procurement |
| AF2-356 | Albright-Mt. Zion 138 kV | Under Construction |
| AF2-359 | Olive-University Park 345 kV | Engineering & Procurement |
| AF2-361 | Mifflintown Tap 69 kV | Engineering & Procurement |
| AF2-365 | Munfordville KU Tap-Horse Cave Jct. 69 kV | Active |
| AF2-366 | Crego Rd 138 kV | Engineering & Procurement |
| AF2-370 | Delaware-Royerton 138 kV | Active |
| AF2-371 | Harrison-Good Hope 138 kV | Engineering & Procurement |
| AF2-375 | Ebersole-Fostoria 138 kV | Engineering & Procurement |
| AF2-376 | Timber Switch 138 kV | Active |
| AF2-377 | Logtown 138 kV | Engineering & Procurement |
| AF2-378 | Cambridge 12 kV | Engineering & Procurement |
| AF2-379 | Princess Anne 25 kV | Under Construction |
| AF2-382 | Hurley 69 kV | Engineering & Procurement |
| AF2-383 | Tolna 115 kV | Withdrawn |
| AF2-388 | Keystone-Desoto 345 kV | Active |
| AF2-389 | Kenzie Creek-Stone Lake 69 kV | Withdrawn |
| AF2-392 | Nelson-Dixon 138 kV | Active |
| AF2-396 | Stinger 138 kV | Active |
| AF2-407 | Fall Creek 345 kV | Active |
| AF2-408 | Fall Creek 138 kV | Engineering & Procurement |
| AF2-417 | West Damascus Tap-West Damascus 69 kV | Engineering & Procurement |
| AF2-421 | East Hazelton-Weatherly Tap 69 | Engineering & Procurement |
| AF2-424 | Reed-Reed Tap #1 69 kV | Engineering & Procurement |
| AF2-425 | Reed-Reed Tap#1 69 kV | Engineering & Procurement |
| AF2-433 | Columbia-Geisinger Tap #1 69 kV | Engineering & Procurement |
| AF2-434 | Columbia-Geisinger Tap #1 69 kV | Engineering & Procurement |
| AF2-440 | Hillsboro-Middleboro 138 kV | Engineering & Procurement |
| AF2-441 | Burnham 138kV | Active |
| AG1-007 | Tar River 12.5 kV | Engineering & Procurement |
| AG1-017 | Jay 138 kV | Under Construction |
| AG1-024 | Centerburg 138 kV | Engineering & Procurement |
| AG1-034 | Centerburg 138 kV | Engineering & Procurement |
| AG1-039 | Galion 138 kV II | Under Construction |
| AG1-040 | Morgan Street-Mount Hope 34.5 kV | Engineering & Procurement |
| AG1-047 | Jay 138 kV | Engineering & Procurement |
| AG1-054 | Potter-Harlan 69 kV | Engineering & Procurement |
| AG1-066 | Bonnyman 69 kV | Engineering & Procurement |
| AG1-070 | Bon Ayr 69 kV | Active |
| AG1-071 | Bon Ayr 69 kV | Active |
| AG1-100 | Venango-Saegertown 34.5 kV | Engineering & Procurement |
| AG1-107 | Hillsboro-Middleboro 138 kV | Engineering & Procurement |
| AG1-109 | Valley 138 kV | Active |
| AG1-118 | Sugar Grove-Waterman 138kV | Active |
| AG1-124 | Gladstone 138 kV | Active |
| AG1-125 | Marysville-Flatlick 765 kV | Engineering & Procurement |
| AG1-126 | Marysville-Flatlick 765 kV | Engineering & Procurement |
| AG1-127 | Crego Rd 138 kV | Active |
| AG1-145 | Lightfoot 34.5 kV | In Service |
| AG1-156 | Jack Frost-Lake Harmony 69 kV | Engineering & Procurement |
| AG1-164 | East Hazelton-Weatherly Tap 69 kV | Engineering & Procurement |
| AG1-165 | East Hazelton-Weatherly Tap 69 kV | Engineering & Procurement |
| AG1-188 | Manitou-Oyster Creek 34.5 kV | Engineering & Procurement |
| AG1-189 | Oyster Creek-Bamber Lake 34.5 | Engineering & Procurement |
| AG1-191 | Chester-Pohatcong Mountain 34.5 kV | Partially in Service - Under Construction |
| AG1-193 | Utica Junction 34.5 kV | Suspended |
| AG1-197 | Morgan Street-Cochranton 34.5 kV | Suspended |
| AG1-198 | Union City 34.5 kV | Under Construction |
| AG1-223 | Larrabee-Allaire 34.5 kV | Under Construction |
| AG1-226 | Dequine-Eugene 345 kV | Active |
| AG1-232 | Magley 138 kV | Engineering & Procurement |
| AG1-236 | Lanesville-Brokaw 345 kV | Active |
| AG1-237 | Dequine-Eugene 345 kV | Engineering & Procurement |
| AG1-254 | Salem-Woodstown 69 kV | Engineering & Procurement |
| AG1-259 | Sunbury-Dalmatia 69 kV | Engineering & Procurement |
| AG1-260 | Sunbury-Dalmatia 69 kV | Engineering & Procurement |
| AG1-281 | Claysburg-HCR Tap 46 kV | Engineering & Procurement |
| AG1-282 | Dunnsville 34.5 kV | Engineering & Procurement |
| AG1-297 | Hanna-Tanners Creek 345 kV | Active |
| AG1-301 | Miller REC-Warrior Ridge 46 kV | Engineering & Procurement |
| AG1-302 | Olive-Reynolds #1 345 kV | Under Construction |
| AG1-320 | Glendale-Stephensburg 69 kV | Active |
| AG1-323 | Blue Jacket 138 kV | Active |
| AG1-324 | Jay-Desoto 138 kV | Engineering & Procurement |
| AG1-341 | Summer Shade 161 kV | Active |
| AG1-348 | Pequest River-Washington 34.5 kV | In Service |
| AG1-349 | Olive-Reynolds #2 345 kV | Engineering & Procurement |
| AG1-351 | Harrison-Good Hope 138 kV | Engineering & Procurement |
| AG1-354 | Summershade-Green County 161 kV | Active |
| AG1-363 | Black Oak-Hatfield 500 kV | Engineering & Procurement |
| AG1-365 | Allen 345 kV | Engineering & Procurement |
| AG1-366 | Allen 345 kV | Engineering & Procurement |
| AG1-367 | DeSoto 345 kV | Active |
| AG1-368 | Tillman 138 kV | Engineering & Procurement |
| AG1-369 | Logtown 138 kV | Engineering & Procurement |
| AG1-374 | Blue Mound 345 kV | Active |
| AG1-375 | Sorenson-Desoto 345 kV | Active |
| AG1-386 | Smith-Francis Junction 25 kV | In Service |
| AG1-397 | Walston 12 kV | Withdrawn |
| AG1-405 | Walnut Grove-Asahi 69 kV | Active |
| AG1-406 | Walnut Grove-Asahi 69 kV | Active |
| AG1-410 | Maddox Creek-RP Mone 345 kV | Active |
| AG1-411 | Maddox Creek-RP Mone 345 kV | Active |
| AG1-433 | Keystone-DeSoto 345 kV | Active |
| AG1-436 | Olive-University Park 345 kV | Active |
| AG1-447 | Olive-University Park 345 kV | Active |
| AG1-460 | Kincaid-Pana 345 kV | Active |
| AG1-462 | Cordova 345 kV | Active |
| AG1-469 | Gordonsville 34.5 kV | Engineering & Procurement |
| AG1-471 | Up Church-Wayne County 69 kV | Active |
| AG1-478 | Wilmington 34.5 kV | Engineering & Procurement |
| AG1-480 | Shawnee 34.5 kV | Engineering & Procurement |
| AG1-482 | Hamilton 115 kV | Withdrawn |
| AG1-494 | Boxwood-Riverville 138 kV | Active |
| AG1-495 | Gilbert-Rocktown 34.5 kV | Engineering & Procurement |
| AG1-499 | Lambs 12.47 kV | Under Construction |
| AG1-508 | Point Lookout 69 kV | Engineering & Procurement |
| AG1-512 | University Park North 345 kV | Withdrawn |
| AG1-513 | Aurora 138 kV | Suspended |
| AG1-526 | West Garrard 345 kV | Active |
| AG1-554 | South Kenton 138 kV | Engineering & Procurement |
| AG1-555 | Dequine 345 kV | Engineering & Procurement |
| AG1-558 | Buckner 34.5 kV | Engineering & Procurement |
| AG1-559 | Caroline Pines 22 kV | Engineering & Procurement |
| AG2-014 | Meadow Lake 345 kV | Active |
| AG2-029 | Forest G. Hipple-Collingwood 345 kV | Active |
| AG2-063 | North Hampton 69 kV | Active |
| AG2-068 | Heritage - Wake 500 kV | Active |
| AG2-069 | Heritage - Wake 500 kV | Active |
| AG2-072 | Rockport 765 kV | Active |
| AG2-073 | Crooksville 69 kV | Active |
| AG2-081 | Mt. Sterling-Fogg Pike 69 kV | Active |
| AG2-085 | Delaware-Royerton 138 kV | Active |
| AG2-104 | Marysville-Flatlick 765 kV | Active |
| AG2-106 | Marysville-Flatlick 765 kV | Active |
| AG2-107 | Marysville-Flatlick 765 kV | Active |
| AG2-111 | Perth 34.5 kV Substation (Circuit 408) | Active |
| AG2-112 | Perth 34.5 kV Substation (Circuit 404) | Active |
| AG2-114 | Dresden-Pontiac Midpoint 345 kV | Active |
| AG2-125 | Camden-Crystal 69 kV | Active |
| AG2-126 | Eugene 345 kV | Active |
| AG2-149 | Galion-South Berwick 345 kV | Active |
| AG2-152 | Banister-Bear Skin 138 kV | Active |
| AG2-159 | Williamstown 69 kV | Active |
| AG2-162 | Jefferson-Greentown 765 kV | Active |
| AG2-163 | Dequine-Eugene 345 kV | Active |
| AG2-164 | Jefferson-Greentown 765 kV | Active |
| AG2-165 | Dumont-Greentown 765 kV | Active |
| AG2-179 | Sewellton Junction 69 kV | Active |
| AG2-184 | Harbert Metering 138 kV | Active |
| AG2-191 | Mississinewa 138 kV | Active |
| AG2-192 | Mississinewa 138 kV | Active |
| AG2-212 | Dumont-Greentown 765 kV | Active |
| AG2-216 | East Sidney-Quincy 138 kV | Active |
| AG2-219 | Jefferson-Greentown 765 kV | Active |
| AG2-230 | Dumont 345 kV | Active |
| AG2-245 | Olive - Reynolds #1 345 kV | Active |
| AG2-272 | Berry Hill 138 kV | Active |
| AG2-298 | Sulphur Creek-Loretto 69 kV | Active |
| AG2-310 | Matt Funk 138 kV | Active |
| AG2-311 | Smith Mountain 138 kV | Active |
| AG2-328 | Dumont - Greentown 765 kV | Active |
| AG2-329 | S Berwick - Galion 345 kV | Active |
| AG2-330 | Dumont - Greentown 765 kV | Active |
| AG2-331 | Jefferson-Greentown 765 kV | Active |
| AG2-332 | East Elkhart – Elcona Tap 138 kV | Active |
| AG2-343 | Eugene - Dequine 345 kV | Active |
| AG2-344 | Dequine 345 bkV | Active |
| AG2-345 | Eugene - Dequine 345 kV | Active |
| AG2-360 | Broadford 138 kV | Active |
| AG2-363 | Powerton 345 kV | Active |
| AG2-364 | Powerton 345 kV | Active |
| AG2-369 | Heritage - Wake 500 kV | Active |
| AG2-370 | Tillman 138 kV | Active |
| AG2-378 | North Hampton – Medway 69 kV | Active |
| AG2-385 | North Hampton 69 kV | Active |
| AG2-400 | Allen 345 kV | Active |
| AG2-401 | Losantville 345 kV | Active |
| AG2-402 | Allen 345 kV | Active |
| AG2-405 | Continental 69 kV | Active |
| AG2-406 | Payne 69 kV | Active |
| AG2-408 | Allen 345 kV | Active |
| AG2-424 | Magnolia - Summersville 69 kV | Active |
| AG2-444 | Bixby - Biers Run 345 kV | Active |
| AG2-449 | Jefferson-Greentown 765 kV | Active |
| AG2-453 | Lasalle - Plano 345 kV | Active |
| AG2-487 | Madison - Tanners Creek 138 kV | Active |
| AG2-491 | Meadow Lake 345 kV | Active |
| AG2-492 | Meadow Lake 345 kV | Active |
| AG2-515 | Midway 345 kV III | Active |
| AG2-516 | Pecatonica 138kV | Active |
| AG2-518 | Tech Drive 138 kV | Active |
| AG2-519 | Royerton - Desoto 138 kV | Active |
| AG2-524 | LaSalle Station - Mazon 138 kV | Active |
| AG2-548 | Corwin - Elk 138 kV | Active |
| AG2-550 | Bluff Point - Randolph 138 kV | Active |
| AG2-551 | Bluff Point - Randolph 138 kV | Active |
| AG2-562 | Elderberry 345 kV | Active |
| AG2-564 | Sulphur Springs 138 kV | Active |
| AG2-568 | Stink Run – Sundial 138 kV | Active |
| AG2-570 | Heritage - Wake 500 kV | Active |
| AG2-571 | Heritage - Wake 500 kV | Active |
| AG2-575 | Crego Rd. 138 kV | Active |
| AG2-585 | Kensington 138kV | Active |
| AG2-589 | Ravenswood - Hemlock 69 kV | Active |
| AG2-637 | Randolph - Hodgin 138 kV | Active |
| AG2-657 | Kanawha River - Carbondale 138 kV | Active |
| AG2-660 | Nelson-Electric Junction 345 kV | Active |
| AG2-665 | Corwin - Elk 138 kV | Active |
| AG2-670 | Green County -Taylor County Junction 161 kV | Active |
| AG2-675 | Cordova 345 kV | Active |
| AH1-004 | Avon - Renaker 138 kV | Active |
| AH1-034 | Patton Road Junction - Summer Shade 69 kV | Active |
| AH1-044 | Nelson - Electric Junction 345 kV | Active |
| AH1-047 | Marengo - Belvidere 138 kV | Active |
| AH1-055 | Kyger Creek - Don Marquis 345 kV | Active |
| AH1-072 | Red Onion - VC5 69 kV | Active |
| AH1-073 | Red Onion - VC5 69 kV | Active |
| AH1-075 | North Waldo - Wild Creek 138 kV | Active |
| AH1-098 | Wolf Glade-West Carroll 138 kV | Active |
| AH1-133 | Saltville - Tazewell 138 kV | Active |
| AH1-136 | Falcon - Middle Creek 46 kV | Active |
| AH1-144 | Peter's Mountain 138 kV | Active |
| AH1-145 | Peter's Mountain 138 kV | Active |
| AH1-146 | White Rock - Wayne 345 kV | Active |
| AH1-147 | White Rock - Wayne 345 kV | Active |
| AH1-151 | Nelson-Electric Junction 345 kV | Active |
| AH1-153 | Dumont 345 kV | Active |
| AH1-164 | Oak Level - Tank Hill 138 kV | Active |
| AH1-188 | Pigeon Creek 138 kV | Active |
| AH1-196 | Prairie 345 kV | Active |
| AH1-227 | Flemming - Fremont 69 kV | Active |
| AH1-234 | Wempletown - Paddock 345 kV | Active |
| AH1-239 | Upchurch - Zula 69 kV | Active |
| AH1-269 | Claytor 138 kV | Active |
| AH1-272 | Argenta - Twin Branch 345 kV | Active |
| AH1-281 | Bluegrass Parkway Tap - Woodlawn 69 kV | Active |
| AH1-282 | Galion - Ohio Central 345 kV | Active |
| AH1-285 | Sandwich 138 kV | Active |
| AH1-292 | Sullivan 345 kV | Active |
| AH1-298 | Meridian 345 kV | Active |
| AH1-302 | Olive - Reynolds 345 kV | Active |
| AH1-304 | Delaware-Van Buren 138 kV | Active |
| AH1-305 | Olive - Reynolds 345 kV | Active |
| AH1-306 | Mississinewa-Gaston 138 kV | Active |
| AH1-308 | Pennville - Adams 138 kV | Active |
| AH1-309 | Kenzie Creek-Colby 138 kV | Active |
| AH1-311 | Heartsease DP - Mayo Dunbar 115kV | Active |
| AH1-314 | East Danville 138 kV | Active |
| AH1-327 | Hardin Switch 345 kV | Active |
| AH1-328 | Blue Jacket - Kirby 138 kV | Active |
| AH1-337 | Randolph - Hodgin 138 kV | Active |
| AH1-338 | McGirr Rd - Ritchie Road 138kV | Active |
| AH1-339 | West Crawford 69 kV | Active |
| AH1-341 | Stillman - Dixon 138KV | Active |
| AH1-348 | Pound 34.5 kV | Active |
| AH1-391 | Olive 138 kV | Active |
| AH1-392 | Gravel Pit-Kankakee 138 kV | Active |
| AH1-427 | Tommy Gooch - Garrard County 69 kV | Active |
| AH1-482 | Olive - Reynolds #2 345 kV | Active |
| AH1-535 | Nagel - Cane River 230 kV | Active |
| AH1-537 | Pierce - Kyger Creek 345 kV | Active |
| AH1-539 | South Kenton 138 kV | Active |
| AH1-541 | Chestnut 345 kV | Active |
| AH1-542 | Crissinger-Kirby 138kV | Active |
| AH1-543 | Mulberry – Tazewell 345 kV | Active |
| AH1-563 | Aurora E.C. 138kV | Active |
| AH1-564 | Rockford II 138 kV | Active |
| AH1-567 | University Park 138 kV | Active |
| AH1-570 | Headquarters - Millersburg Junction 69 kV | Active |
| AH1-571 | Headquarters - Millersburg Junction 69 kV | Active |
| AH1-617 | Harbert Metering 138 kV | Active |
| AH1-644 | Spicewood Metering 138 kV | Active |
| AH1-664 | Goddard-Plumville 138 kV | Active |
| AH1-665 | Goddard-Plumsville 138 kV II | Active |
| AH1-666 | Flemingsburg - Spurlock 138 kV | Active |
| AH1-669 | Circleville-Biers Run 138 kV | Active |
| AH1-670 | Blue Mound-Chestnut 345 kV | Active |
| AH1-673 | State Line - River Energy Center 138 kV | Active |
| AH1-686 | Hanging Rock 765 kV | Active |
| AH1-690 | Bay Shore - Lallendorf 345 kV | Active |
| AH1-698 | Braidwood 345 kV | Active |
| AH1-702 | Byron 345 kV | Active |
| AH1-711 | Lemoyne 345 kV | Active |
| AH1-714 | Lasalle 345 kV | Active |
| AH1-718 | Nelson 345 kV | Active |
| AH1-721 | Laurel-Cooper 161 kV | Active |
| AH1-735 | Richland 138 kV | Active |
| U2-030 | Four Mile Ridge Wind 138kV | In Service |
| U2-072 | East Lima-Marysville 345kV | In Service |
| U2-073 | Frostburg 138kV II | In Service |
| V1-011 | Haviland 138kV | In Service |
| V3-007 | Desoto-Tanners Creek #1 345kV | In Service |
| V4-067 | Cates Road Egg Harbor Township 12kV | Deactivated |
| V4-073 | Yankee 12.5kV | In Service |
| W1-003 | Oak Hall | In Service |
| W1-004 | Oak Hall | In Service |
| W1-005 | Oak Hall | In Service |
| W1-006 | Oak Hall | In Service |
| W1-056 | Ada-Dunkirk 69kV | In Service |
| W1-130 | Vine Road 12kV | In Service |
| W2-030 | Egg Harbor Township | In Service |
| W2-048 | Brokaw-Lanesville | In Service |
| W3-077 | Broadway-Stewartsville 34.5kV | In Service |
| W4-005 | Blue Mound-Latham | In Service |
| X1-042 | Watervliet | In Service |
| X2-022 | Brokaw-Lanesville | In Service |
| X2-052 | Dumont-Olive 345kV | In Service |
| X3-005 | Wildwood 12kV | In Service |
| X3-066 | Church Hill 69kV | In Service |
| Y1-033 | Penn Mar-Rock Wood 115kV | In Service |
| Y1-049 | Wurno 34.5kV | In Service |
| Y1-079 | Wye Mills 69kV | In Service |
| Y1-080 | Dorchester 12kV | In Service |
| Y1-086 | Morgans Corner | In Service |
| Y3-023 | Country Side 12kV | In Service |
| Y3-024 | Bluff Point 12kV | In Service |
| Y3-058 | Rockawalkin 69kV | In Service |
| Z2-044 | Whitakers 34.5kV | In Service |
| Z2-076 | Worcester South 25kV | In Service |
| Z2-077 | Worcester North 25kV | In Service |
| Z2-087 | Pontiac MidPoint-Brokaw 345kV | In Service |
| Z2-115 | Deer Creek 12.47kV | In Service |
| Z2-116 | Twin Branch 12.47kV | In Service |
Affected System - PJM Identified Violations
As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.
| AH1-150 System Reinforcements: | TO | Trans Owner ID | Title | Allocated Cost ($USD) |
|---|---|---|---|
| AMIL | AMIL_TC2_18783 | Build second 345 kV line between Snyder (J1180 POI) and Sullivan | $7,587,550 |
| NIPS | NIPS_TC1_15151 | NIPS SN/SE ratings of 1538/1877 MVA achieved by change out of 2156 ACSR line conductor with 2-1590 ACSR conductor and change out of 2156 ACSR conductor drop with 3000 AL conductor | $553,402 |
| NIPS | NIPS_TC2_18494 | Reconductor 2.9 miles of overhead line to 2-795 ACSS@ 250°C. | $463,187 |
| NIPS | NIPS_TC1_15152 | NIPS SN/SE ratings of 2133/2577 MVA achieved by change out of 2156 ACSR line conductor with 2-1590 ACSR conductor. | $147,630 |
| NIPS | NIPS_TC1_12093 | Upgrade 2000A wave trap and line switch at Green Acres substation. | $60,525 |
| NIPS | NIPS_TC2_18520 | Existing NIPS rating: SN/SE: 1538/1877 MVA | $0 |
| Grand Total: | $8,812,294 | ||
System Reinforcement
- Type
- Load Flow
- TO
- AMIL
- RTEP ID / TO ID
- (Pending) / AMIL_TC2_18783
- Title
- Build second 345 kV line between Snyder (J1180 POI) and Sullivan
- Description
- Build second 345 kV line between Snyder (J1180 POI) and Sullivan. For Ameren's portion of line, river crossing needed for this upgrade. Estimating 5 miles long.
- Total Cost ($USD)
- $59,202,000
- Allocated Cost ($USD)
- $7,587,550
- Time Estimate
- TBD
Contributor
| Facility | Contingency | |
|---|---|---|
| 05SULLIVAN-7SNYDER 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 20.8 MW | 21.0% | $12,407,033 |
AG2-364 | 13.8 MW | 14.0% | $8,271,355 |
AG2-660 | 1.5 MW | 1.5% | $882,079 |
AH1-044 | 12.7 MW | 12.8% | $7,587,550 |
AH1-146 | 12.5 MW | 12.6% | $7,439,442 |
AH1-147 | 12.5 MW | 12.6% | $7,439,442 |
AH1-150 | 12.7 MW | 12.8% | $7,587,550 |
AH1-151 | 12.7 MW | 12.8% | $7,587,550 |
System Reinforcement
- Type
- Load Flow
- TO
- NIPS
- RTEP ID / TO ID
- (Pending) / NIPS_TC1_15151
- Title
- NIPS SN/SE ratings of 1538/1877 MVA achieved by change out of 2156 ACSR line conductor with 2-1590 ACSR conductor and change out of 2156 ACSR conductor drop with 3000 AL conductor
- Description
- NIPS SN/SE ratings of 1538/1877 MVA achieved by change out of 2156 ACSR line conductor with 2-1590 ACSR conductor and change out of 2156 ACSR conductor drop with 3000 AL conductor
- Total Cost ($USD)
- $6,200,000
- Allocated Cost ($USD)
- $553,402
- Time Estimate
- TBD
Contributor
| Facility | Contingency | |
|---|---|---|
| 17SHEFFIELD-BURNHAM ; B 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 21.4 MW | 12.9% | $802,116 |
AG2-364 | 14.3 MW | 8.6% | $534,719 |
AG2-453 | 22.4 MW | 13.5% | $837,647 |
AG2-660 | 1.7 MW | 1.0% | $64,359 |
AH1-044 | 14.8 MW | 8.9% | $553,402 |
AH1-146 | 15.0 MW | 9.1% | $561,301 |
AH1-147 | 15.0 MW | 9.1% | $561,301 |
AH1-150 | 14.8 MW | 8.9% | $553,402 |
AH1-151 | 14.8 MW | 8.9% | $553,402 |
AH1-234 | 16.3 MW | 9.8% | $609,599 |
AH1-714 | 15.2 MW | 9.2% | $568,752 |
System Reinforcement
- Type
- Load Flow
- TO
- NIPS
- RTEP ID / TO ID
- (Pending) / NIPS_TC2_18494
- Title
- Reconductor 2.9 miles of overhead line to 2-795 ACSS@ 250°C.
- Description
- Reconductor 2.9 miles of overhead line to 2-795 ACSS@ 250°C.
- Total Cost ($USD)
- $6,000,000
- Allocated Cost ($USD)
- $463,187
- Time Estimate
- TBD
Contributor
| Facility | Contingency | |
|---|---|---|
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 34.8 MW | 11.2% | $673,557 |
AG2-364 | 23.2 MW | 7.5% | $449,025 |
AG2-453 | 36.7 MW | 11.8% | $710,327 |
AG2-660 | 2.8 MW | 0.9% | $53,857 |
AH1-044 | 23.9 MW | 7.7% | $463,187 |
AH1-146 | 24.2 MW | 7.8% | $469,231 |
AH1-147 | 24.2 MW | 7.8% | $469,231 |
AH1-150 | 23.9 MW | 7.7% | $463,187 |
AH1-151 | 23.9 MW | 7.7% | $463,187 |
AH1-234 | 26.3 MW | 8.5% | $509,798 |
AH1-338 | 21.7 MW | 7.0% | $421,283 |
AH1-543 | 18.9 MW | 6.1% | $365,935 |
AH1-714 | 25.2 MW | 8.1% | $488,197 |
System Reinforcement: n9133.0
- Type
- Load Flow
- TO
- NIPS
- RTEP ID / TO ID
- n9133.0 / NIPS_TC1_15152
- Title
- NIPS SN/SE ratings of 2133/2577 MVA achieved by change out of 2156 ACSR line conductor with 2-1590 ACSR conductor.
- Description
- NIPS SN/SE ratings of 2133/2577 MVA achieved by change out of 2156 ACSR line conductor with 2-1590 ACSR conductor.
- Total Cost ($USD)
- $1,800,000
- Allocated Cost ($USD)
- $147,630
- Time Estimate
- TBD
Contributor
| Facility | Contingency | |
|---|---|---|
| 17MUNSTER-BURNHAM ;0R 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 28.0 MW | 12.4% | $222,720 |
AG2-364 | 18.7 MW | 8.2% | $148,480 |
AG2-453 | 27.0 MW | 11.9% | $214,496 |
AG2-660 | 2.2 MW | 1.0% | $17,164 |
AH1-044 | 18.6 MW | 8.2% | $147,630 |
AH1-146 | 18.9 MW | 8.3% | $150,030 |
AH1-147 | 18.9 MW | 8.3% | $150,030 |
AH1-150 | 18.6 MW | 8.2% | $147,630 |
AH1-151 | 18.6 MW | 8.2% | $147,630 |
AH1-234 | 20.6 MW | 9.1% | $163,371 |
AH1-338 | 16.8 MW | 7.4% | $133,669 |
AH1-714 | 19.8 MW | 8.7% | $157,149 |
System Reinforcement: n9113.0
- Type
- Load Flow
- TO
- NIPS
- RTEP ID / TO ID
- n9113.0 / NIPS_TC1_12093
- Title
- Upgrade 2000A wave trap and line switch at Green Acres substation.
- Description
- Upgrade wave trap and M.O. at GreenAcres substation. Current MISO end ratings are Rate A = 1195 and Rate B = 1195 MVA
- Total Cost ($USD)
- $1,000,000
- Allocated Cost ($USD)
- $60,525
- Time Estimate
- 12 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05OLIVE-17P9700-EAST 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 23.0 MW | 8.8% | $87,838 |
AG2-364 | 15.4 MW | 5.9% | $58,559 |
AG2-453 | 24.6 MW | 9.4% | $93,654 |
AG2-524 | 11.1 MW | 4.2% | $42,433 |
AG2-575 | 10.1 MW | 3.9% | $38,579 |
AG2-585 | 11.3 MW | 4.3% | $43,191 |
AG2-660 | 1.8 MW | 0.7% | $7,036 |
AH1-044 | 15.9 MW | 6.1% | $60,525 |
AH1-146 | 16.1 MW | 6.1% | $61,345 |
AH1-147 | 16.1 MW | 6.1% | $61,345 |
AH1-150 | 15.9 MW | 6.1% | $60,525 |
AH1-151 | 15.9 MW | 6.1% | $60,525 |
AH1-196 | 12.1 MW | 4.6% | $46,145 |
AH1-234 | 17.5 MW | 6.7% | $66,559 |
AH1-338 | 14.4 MW | 5.5% | $55,067 |
AH1-341 | 11.5 MW | 4.4% | $43,953 |
AH1-543 | 12.5 MW | 4.8% | $47,803 |
AH1-714 | 17.0 MW | 6.5% | $64,916 |
System Reinforcement
- Type
- Load Flow
- TO
- METC
- RTEP ID / TO ID
- (Pending) / METC_TC1_16078
- Title
- Perform sag mitigation on Allen Junction - Morocco 345kV line. New ratings will be 1861/2124 MVA.
- Description
- Perform sag mitigation on Allen Junction - Morocco 345kV line. New ratings will be 1861/2124 MVA.
- Total Cost ($USD)
- $625,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 18 Months
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 is a potential Aggregate Pool Contributor.
| Facility | Contingency | |
|---|---|---|
| 02ALLEN-18MOROCCO 345.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- ITCT
- RTEP ID / TO ID
- (Pending) / ITCT_TC1_15164
- Title
- Reconductor ITCT section of Lallendorf-Monroe line. Post upgrade ratings will be 1677/2124.
- Description
- Reconductor ITCT section of Lallendorf-Monroe line. Post upgrade ratings will be 1677/2124.
- Total Cost ($USD)
- $43,500,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 36 Months
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 is a potential Aggregate Pool Contributor.
| Facility | Contingency | |
|---|---|---|
| 02LALLENDORF-19MON12 345.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- NIPS
- RTEP ID / TO ID
- (Pending) / NIPS_TC2_18520
- Title
- Existing NIPS rating: SN/SE: 1538/1877 MVA
- Description
- Existing NIPS rating: SN/SE: 1538/1877 MVA
- Total Cost ($USD)
- $0
- Allocated Cost ($USD)
- $0
- Time Estimate
- TBD
Note: This reinforcement is fictitious and will not be cost allocated to projects. It is listed for information purposes only.
| Facility | Contingency | |
|---|---|---|
| 17STJOHN-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
No cost allocated AFS Tie Line reinforcements were identified for this project in the Phase I System Impact Study load flow analysis.
System Reinforcement
- Type
- Load Flow
- TO
- CPLE
- RTEP ID / TO ID
- (Pending) / TC2-CPLE-0001
- Title
- Person - VP Hendrick 230kV Line (Existing Line Uprate)
- Description
- Currently no costs since there is already a DEP project to reconductor to upgrade this line. This is the estimated ISD for the current project CPLE is developing. The Person - Hendrick 230 kV line will be reconductored with bundled 795 ACSS/TW and will have a rating 1195MVA.
- Total Cost ($USD)
- $0
- Allocated Cost ($USD)
- $0
- Time Estimate
- 0 to 48 Months
Info Note: AH1-150 contributes to the loading of an overloaded tie line facility between PJM and an affected system entity, which was identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line and will be confirmed in subsequent study phases, along with cost allocation of such upgrade if applicable, in coordination with the affected system.
| Facility | Contingency | |
|---|---|---|
| 6PERSON230 T-AC2-100 TAP 230.0 kV Ckt 1 line | (Any) |
Affected System - Non-PJM Identified Violations
In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with potential Affected System impacts. PJM initiates coordination with each Affected System Operator by providing a list of New Service Requests in the Cycle with potential impacts to their respective system. If the Affected System Operator indicates an Affected System Study is required, PJM will notify the Project Developer or Eligible Customer of the need for an Affected System Study. See below if any Affected System Operator requires a study for this project:
System Reinforcements
Based on the Phase I analysis results, this project may have a cost responsibility for the following System Reinforcements:
| TO | RTEP ID | Title | Allocated Cost ($USD) |
|---|---|---|---|
| AEP | (Pending) / AEP-TC2-18693 | Greentown 765 kV to Marysville 765 kV - Greenfield Line | $54,655,930 |
| ComEd | (Pending) / CE_NUN_L0627.3 | TC2 Network Upgrade L0627 | $9,883,581 |
| AEP | (Pending) / AEP-TC2-18653 | 05MALIS 765.0 kV to 05VASSEL 765.0 kV ckt 1 - Replace Equipment | $5,609,097 |
| ComEd | (Pending) / CE_NUN_TSS155_TR83 | TSS155 Nelson New Transformer | $4,877,657 |
| ComEd | n8379 / CE_NUN_L11212_NEW TR | Wilton Center - Install 3rd Transformer | $3,281,263 |
| AEP | (Pending) / AEP-TC2-18798 | 05ELDERBERRY 345kV – 05DUMONT 345kV ckt 1 - Rebuild | $3,151,374 |
| AEP | n9182.0 / AEPIMJMS01 | Rebuild Olive - AF2-359 345kV | $3,097,898 |
| AEP | (Pending) / AEP-TC2-18686 | 05MADDOX 345.0 kV to 05E LIMA 345.0 kV ckt 1 - String the 2nd conductor | $2,744,065 |
| ATSI | (Pending) / TC2-ATSI-014.a | Reconductor (possible rebuild) 29.61 miles of transmission line and line drops ( line drops at Hayes) on the Beaver - Hayes Ckt 1 345 kV line | $2,675,499 |
| ATSI | (Pending) / TC2-ATSI-006.a | Reconductor (possible rebuild) 30.25 miles of 954 ACSR 48/7 transmission line and line drops (line drops at Davis Besse) on the Davis Besse-Hayes 345 kV line | $2,563,827 |
| ATSI | (Pending) / TC2-ATSI-015.a | Reconductor (possible rebuild) 21.68 miles of transmission line and (1) line drop (line drop at Lemoyne) on the Davis Besse - Lemoyne 345 kV | $2,142,071 |
| AEP | (Pending) / AEP-TC2-18670 | 17STILLWELL 345.0 kV to 05DUMONT 345.0 kV ckt 1 - Reconductor and Replace Equipment | $2,011,774 |
| AEP | n7619.2 / AEPI0032b | Reconductor/Rebuild 14 miles of ACSR ~ 954 ~ 45/7 ~ RAIL Dumont - Elderberry 345kV line | $2,000,872 |
| ComEd | (Pending) / CE_NUN_TSS 111 | TSS 167 Plano new circuit breaker | $1,612,894 |
| ATSI | (Pending) / TC2-ATSI-002.d | Reconductor (possible rebuild) 345kV 20.75 miles of transmission line and line drops at both remote ends | $1,451,212 |
| ComEd | (Pending) / CE_NUN_COLLINS_TR | Collins Station 23 New Transformer | $1,392,229 |
| ComEd | (Pending) / CE_NUN_L17705_1 | Reconductor Sheffield - Burnham and upgrade station conductor at Burnham | $1,249,617 |
| AEP | (Pending) / AEP-TC2-18635 | 05MARYSVL_RM 765.0 kV to 05MALIS 765.0 kV ckt 1 - Replace Equipment | $1,039,432 |
| AEP | (Pending) / AEP-TC2-18634 | 05MARYSV 765.0 kV to 05MARYSV 345.0 kV ckt 2 - Add second XFMR | $1,016,684 |
| AEP | n7683 | Rebuild/reconductor 3.05 mi. of the 1275 ACSR/PE 54/19 conductor with 2-954 ACSR 54/7 conductor size with a SN rating of 1410 MVA. | $781,001 |
| ComEd | n9678.0 / CE_NUN_L11215_1 | Mitigate the sag on L11215 | $735,575 |
| AEP | (Pending) / AEP-TC2-18679 | 05GAVIN 765.0 kV to 05MOUNTN 765.0 kV ckt 1 - Replace Equipement | $718,010 |
| ComEd | (Pending) / CE_NUN_L11301_1 | Sandwich - Waterman L11301 138 Kv Line Upgrades | $580,562 |
| ComEd | (Pending) / CE_NUN_L18623.2 | Haumesser - Steward 138 kV Line Reconductor | $475,670 |
| AEP | (Pending) / AEP-TC2-18659 | 05MARYSVL_RS 765.0 kV to 05MARYSV 765.0 kV ckt Z1 - Replace Equipment | $466,912 |
| AEP | (Pending) / AEP-TC2-18677 | 05DUMONT_RW 765.0 kV to 05DUMONT 765.0 kV ckt Z1 - Replace Breaker | $307,333 |
| AEP | (Pending) / AEP-TC2-18689 | AG1-410 TP 345.0 kV to 05MADDOX 345.0 kV ckt 1 - string the 2nd circuit | $306,731 |
| AEP | n6600 / AEPI0001a | Replace Dumont Circuit Breaker B1 | $299,650 |
| AEP | (Pending) / AEP-TC2-18707 | 05ALLEN 345.0 kV to 05RPMONE 345.0 kV ckt 1 - Replace Equipment | $255,176 |
| AEP | (Pending) / AEP-TC2-18732 | 05RPMONE 345kV to AG1-410 TP 345kV ckt 1 - Replace Equipment | $190,396 |
| AEP | (Pending) / AEP-TC2-18819 | 06PIERCE 345kV to 05MARQUIS 345kV ckt 1 - Replace Equipment | $137,152 |
| ATSI | (Pending) / TC2-ATSI-014.d | Upgrade (4) circuit breakers at Beaver and Hayes (B88, B115, B3, B6) | $120,731 |
| AEP | (Pending) / AEP-TC2-18751 | 05KYGER 345kV to 05SPORN 345kV ckt 1 - Replace Equipment and Sag Study | $120,609 |
| ComEd | n8389 / CE_N8389_116BT3-4_1 | TSS 116 Replace Station Conductor | $107,699 |
| AEP | (Pending) / AEP-TC2-18680 | 05MARYSV 765.0 kV to 05MARYSVL_RM 765.0 kV ckt Z1 - Replace Equipment | $94,494 |
| ATSI | (Pending) / TC2-ATSI-002.g | Upgrade (2) 345kV circuit breakers at Bayshore and (2) at Davis Besse | $92,934 |
| AEP | n7619.1 / AEPI0032a | Replace 3000A non oil Circuit Breaker at Dumont | $92,898 |
| ATSI | (Pending) / TC2-ATSI-006.j | Upgrade (6) disconnect switches at Davis Besse (D27,28,29,30,34625,37) and (5) disconnect switches at Hayes (D20,19,16,13,14) | $64,493 |
| ATSI | (Pending) / TC2-ATSI-006.g | Upgrade B66 and B67 circuit breakers at Davis Besse substation | $55,481 |
| ATSI | (Pending) / TC2-ATSI-006.d | Upgrade (2) B18 & B12 345 kV Ciruit Breakers at Hayes | $55,481 |
| ATSI | (Pending) / TC2-ATSI-015.b | Upgrade (4) L300 wavetraps at Davis Besse and Lemoyne | $19,236 |
| ATSI | (Pending) / TC2-ATSI-014.h | Upgrade the B88 and B115 CTs at Beaver | $19,143 |
| ATSI | (Pending) / TC2-ATSI-006.e | Upgrade (2) B12 and B18 CTs at Hayes | $17,935 |
| ATSI | (Pending) / TC2-ATSI-006.c | Upgrade (2) Wave Traps at Davis Besse and (2) Wave Traps at Hayes | $17,324 |
| AEP | (Pending) / AEP-TC2-18687 | 05HANGRCK_RJ 765.0 kV to 05HANG R 765.0 kV ckt Z1 - Replace Equipment | $15,819 |
| ATSI | (Pending) / TC2-ATSI-002.b | Upgrade (3) 345kV bus and line side disconnect switches at Davis Besse substation at Davis Besse | $15,803 |
| ATSI | (Pending) / TC2-ATSI-014.j | Upgrade the B88 and B3 impedance relays at Beaver and Hayes | $15,511 |
| ATSI | (Pending) / TC2-ATSI-006.i | Upgrade (2) 9.6 Ohms impedance relays at Hayes and (2) 12.9 Ohms impedance relays at Davis Besse | $14,532 |
| ATSI | (Pending) / TC2-ATSI-002.f | Upgrade (2) 345kV Wave Traps at Bayshore and (2) at Davis Besse | $14,509 |
| ATSI | (Pending) / TC2-ATSI-002.a | Upgrade (4) 1024.5 ACAR 24/13 sub conductors at Davis Besse | $13,121 |
| ATSI | (Pending) / TC2-ATSI-006.h | Upgrade B66 (1) meter and (1) relay thermals and B67 (1) meter thermal at Davis Besse substation | $12,148 |
| ATSI | (Pending) / TC2-ATSI-002.k | Upgrade the B34545 and 34562 (4) Meter and (2) Relay Thermals at Bayshore and Davis Besse | $11,921 |
| ATSI | (Pending) / TC2-ATSI-014.c | Upgrade (2) L3000 wavetraps at Beaver and Hayes | $11,090 |
| ATSI | (Pending) / TC2-ATSI-014.f | Upgrade the B6 CT at Hayes | $11,062 |
| ATSI | (Pending) / TC2-ATSI-014.g | Upgrade (3) 1590 AAC line drops at Beaver (line drop to WT, Phase 1&3 "B-B", and SHARED NODE TO: WT, PH 2 / 5" AL, PH 1&3) | $9,002 |
| ATSI | (Pending) / TC2-ATSI-002.i | Upgrade B34544 CT at BAYSHORE | $8,502 |
| ATSI | (Pending) / TC2-ATSI-014.i | Upgrade the 10A B115 relay and B88 meter thermal at Beaver | $7,756 |
| AEP | (Pending) / AEPI0020K | Replace Olive Riser Sub Cond 2874 ACSR (72/7) | $6,465 |
| AEP | (Pending) / AEP-TC2-18502 | 05OLIVE 345.0 kV to 05COOK 345.0 kV ckt 1 - Sag Study | $5,084 |
| ATSI | (Pending) / TC2-ATSI-002.j | Upgrade (1) 1590 ACSR 45/7 sub conductor at Davis Besse | $4,701 |
| ATSI | (Pending) / TC2-ATSI-006.f | Upgrade (10) 1590 ACSR sub conductor (B66 and B67 breaker leads, wave trap subconductor, Overheadline-34625) at Davis Besse and B12 breaker leads at Hayes | $4,348 |
| ATSI | (Pending) / TC2-ATSI-006.b | Upgrade 3500 SAC 127 OVERHEAD PIPE to disc sw. 34625 at Davis Besse and B18 breaker leads at Hayes | $4,048 |
| ATSI | (Pending) / TC2-ATSI-002.e | Upgrade 345kV 3500 SAC 127 sub conductor at Davis Besse | $3,076 |
| ATSI | (Pending) / TC2-ATSI-002.c | Upgrade 345kV 1033.5 AAC 61 sub conductors at Davis Besse substation at Davis Besse | $3,076 |
| ATSI | (Pending) / TC2-ATSI-002.h | Upgrade (8) 1590 AAC 61 sub conductor at BAYSHORE | $2,520 |
| ATSI | (Pending) / TC2-ATSI-014.b | Upgrade 3500 SAC (2) B3 and (2) B6 breaker leads at Hayes | $2,321 |
| ATSI | (Pending) / TC2-ATSI-014.e | Upgrade the 1590 AAC (2) B88 and (2) B15 breaker leads at Beaver | $2,321 |
| AEP | (Pending) / AEP-TC2-18516 | 17P9700-EAST 345.0 kV to 05OLIVE 345.0 kV ckt 1 - AEP End Ratings | $0 |
| AEP | (Pending) | AEP end ratings are 1413 MVA | $0 |
| AEP | (Pending) / (Pending) | WILTON ; 765.0 kV to 05DUMONT_RW 765.0 kV ckt 1 - AEP End Ratings | $0 |
| Grand Total: | $112,788,338 | ||
Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18693
- Title
- Greentown 765 kV to Marysville 765 kV - Greenfield Line
- Description
- Construct a new greenfield 765kV line from Greentown to Marysville (~160 miles). Install 2 new 765kV breakers at Marysville and 2 new 765kV breakers at Greentown. Install 765kV shunt reactors at both Marysville and Greentown The new 765kV line reduces equipment at Dumont to be replaced to CB A2 and switch A2S2. s3442.26 replaces Dumont 765kV CB A2 and A2S2 "CONTINGENCY 'AEP_P1-2_GREENTOWN TO MARYSVILLE 765_SRT-A' OPEN BRANCH FROM BUS 242928 TO BUS 243207 CKT 1 / 242928 05MARYSV 765 243207 05GRNTWN 765 1 END CONTINGENCY 'AEP_P4_GREENTOWN CB 765_SRT-A' OPEN BRANCH FROM BUS 242928 TO BUS 243207 CKT 1 / 242928 05MARYSV 765 243207 05GRNTWN 765 1 END CONTINGENCY 'AEP_P4_MARYSVILLE CB 765_SRT-A' OPEN BRANCH FROM BUS 242928 TO BUS 243207 CKT 1 / 242928 05MARYSV 765 243207 05GRNTWN 765 1 END"
- Total Cost ($USD)
- $1,000,000,000
- Allocated Cost ($USD)
- $54,655,930
- Time Estimate
- 72 to 120 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05SORENS-05SORENS 345.0/765.0 kV Ckt 3 transformer | (Any) | |
| 05SORENSN_RM-05MARYSVL_RS 765.0 kV Ckt 1 line | (Any) | |
| 05DUMONT-05DUMONT_RS 765.0 kV Ckt Z1 line | (Any) | |
| 05SORENS-05DUMONT_RS 765.0 kV Ckt 1 line | (Any) | |
| 05SORENS-05SORENSN_RM 765.0 kV Ckt Z1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 174.9 MW | 5.7% | $57,344,152 |
AG2-072 | 540.7 MW | 17.7% | $177,273,817 |
AG2-164 | 166.8 MW | 5.5% | $54,704,127 |
AG2-165 | 201.2 MW | 6.6% | $65,982,922 |
AG2-212 | 201.2 MW | 6.6% | $65,982,922 |
AG2-219 | 256.3 MW | 8.4% | $84,044,734 |
AG2-328 | 201.2 MW | 6.6% | $65,982,922 |
AG2-363 | 173.7 MW | 5.7% | $56,958,574 |
AG2-364 | 115.8 MW | 3.8% | $37,971,836 |
AG2-453 | 178.7 MW | 5.9% | $58,593,344 |
AG2-660 | 20.1 MW | 0.7% | $6,591,210 |
AH1-044 | 166.7 MW | 5.5% | $54,655,930 |
AH1-146 | 159.5 MW | 5.2% | $52,300,825 |
AH1-147 | 159.5 MW | 5.2% | $52,300,825 |
AH1-150 | 166.7 MW | 5.5% | $54,655,930 |
AH1-151 | 166.7 MW | 5.5% | $54,655,930 |
System Reinforcement
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- (Pending) / CE_NUN_L0627.3
- Title
- TC2 Network Upgrade L0627
- Description
- Reconductor L0527 & station conductor work at both line terminals. Possible transmission tower replacement required. This cost and timeline will be determined during PJM PH III Facility Study. The estimate provided below does not include that tower work.
- Total Cost ($USD)
- $30,800,000
- Allocated Cost ($USD)
- $9,883,581
- Time Estimate
- 24 to 30 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| BYRON ; B-LEE CO EC;BP 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-660 | 7.5 MW | 3.7% | $1,149,257 |
AH1-044 | 64.2 MW | 32.1% | $9,883,581 |
AH1-150 | 64.2 MW | 32.1% | $9,883,581 |
AH1-151 | 64.2 MW | 32.1% | $9,883,581 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18653
- Title
- 05MALIS 765.0 kV to 05VASSEL 765.0 kV ckt 1 - Replace Equipment
- Description
- Replace circuit breaker B, Disconnects, and reconductor between structures 432-453 to bring rating up to the sub conductor.
- Total Cost ($USD)
- $153,100,000
- Allocated Cost ($USD)
- $5,609,097
- Time Estimate
- 36 to 48 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05MALIS-05VASSEL 765.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 43.3 MW | 9.4% | $14,361,607 |
AG2-104 | 108.7 MW | 23.5% | $36,021,171 |
AG2-106 | 47.5 MW | 10.3% | $15,751,205 |
AG2-107 | 47.5 MW | 10.3% | $15,751,205 |
AG2-165 | 23.6 MW | 5.1% | $7,831,194 |
AG2-212 | 23.6 MW | 5.1% | $7,831,194 |
AG2-328 | 23.6 MW | 5.1% | $7,831,194 |
AG2-363 | 25.2 MW | 5.5% | $8,360,122 |
AG2-364 | 16.8 MW | 3.6% | $5,573,304 |
AG2-660 | 2.8 MW | 0.6% | $934,905 |
AH1-044 | 16.9 MW | 3.7% | $5,609,097 |
AH1-146 | 24.2 MW | 5.2% | $8,012,806 |
AH1-147 | 24.2 MW | 5.2% | $8,012,806 |
AH1-150 | 16.9 MW | 3.7% | $5,609,097 |
AH1-151 | 16.9 MW | 3.7% | $5,609,097 |
System Reinforcement
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- (Pending) / CE_NUN_TSS155_TR83
- Title
- TSS155 Nelson New Transformer
- Description
- INSTALL NEW AUTO TRANSFORMER AT TSS155, 34KV-138KV WITH TERTIARY. INCLUDE ALL SUPORTIVE ELECTRIC FACILITIES AND 139KV WORK. SITE GRADING AND CIVIL WORK NOT INCLUDED. THESE VALUES WILL BE DETERMINED DURING PHASE III OF THE PJM PROCESS DURING THE FACILITY STUDY.
- Total Cost ($USD)
- $15,200,000
- Allocated Cost ($USD)
- $4,877,657
- Time Estimate
- 24 to 30 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| NELSON ; B-NELSON ;2M 345.0/138.0 kV Ckt 1 transformer | (Any) | |
| NELSON ; R-NELSON ;2M 138.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-660 | 2.6 MW | 3.7% | $567,029 |
AH1-044 | 22.6 MW | 32.1% | $4,877,657 |
AH1-150 | 22.6 MW | 32.1% | $4,877,657 |
AH1-151 | 22.6 MW | 32.1% | $4,877,657 |
System Reinforcement: n8379
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- n8379 / CE_NUN_L11212_NEW TR
- Title
- Wilton Center - Install 3rd Transformer
- Description
- Install 3rd Transforner 1120 MVA at TSS 112 Wilton Center. New breaker installations and bus work at 765kV and 345kV. New relay scheme, foundation work and TSS 112 control building upgrades. A preliminary estimate of $38 M with a preliminary construction timelline of 48 months. This is a resolution to the contingency thererfore the ratings will not change.
- Total Cost ($USD)
- $38,000,000
- Allocated Cost ($USD)
- $3,281,263
- Time Estimate
- 48 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 17MUNSTER-BURNHAM ;0R 345.0 kV Ckt 1 line | COMED_P4_112-65-BT3-4___SRT-A | |
| 17MUNSTER-BURNHAM ;0R 345.0 kV Ckt 1 line | COMED_P4_112-65-BT4-5___SRT-A | |
| WILTON ;-WILTON ;3M 765.0/345.0 kV Ckt 1 transformer | (Any) | |
| WILTON ;-WILTON ;4M 765.0/345.0 kV Ckt 1 transformer | COMED_P4_023-65-BT2-3__ | |
| WILTON ;-WILTON ;4M 765.0/345.0 kV Ckt 1 transformer | COMED_P4_023-65-BT2-3__ | |
| WILTON ;-WILTON ;4M 765.0/345.0 kV Ckt 1 transformer | COMED_P4_023-65-BT3-4__ | |
| WILTON ;-WILTON ;4M 765.0/345.0 kV Ckt 1 transformer | COMED_P4_023-65-BT4-5__ | |
| WILTON ;-WILTON ;4M 765.0/345.0 kV Ckt 1 transformer | COMED_P4_023-65-BT4-5__ | |
| WILTON ;-WILTON ;4M 765.0/345.0 kV Ckt 1 transformer | (Any) | |
| WILTON ; B-WILTON ;3M 345.0 kV Ckt 1 line | (Any) | |
| WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT2-3__ | |
| WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT4-5__ | |
| WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT2-3__ | |
| WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT4-5__ | |
| WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line | COMED_P4_023-65-BT3-4__ | |
| WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 117.3 MW | 12.6% | $4,773,801 |
AG2-364 | 78.2 MW | 8.4% | $3,182,520 |
AG2-453 | 126.2 MW | 13.5% | $5,134,475 |
AG2-660 | 9.4 MW | 1.0% | $381,546 |
AH1-044 | 80.7 MW | 8.6% | $3,281,263 |
AH1-146 | 81.6 MW | 8.7% | $3,321,582 |
AH1-147 | 81.6 MW | 8.7% | $3,321,582 |
AH1-150 | 80.7 MW | 8.6% | $3,281,263 |
AH1-151 | 80.7 MW | 8.6% | $3,281,263 |
AH1-234 | 88.7 MW | 9.5% | $3,607,233 |
AH1-338 | 16.8 MW | 1.8% | $683,349 |
AH1-714 | 92.2 MW | 9.9% | $3,750,120 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18798
- Title
- 05ELDERBERRY 345kV – 05DUMONT 345kV ckt 1 - Rebuild
- Description
- Rebuild ~14.27 miles of 345kV line from Elderberry to Dumont utilizing 2-1590 FALCON ACSR 54/19. At Dumont, replace the 2-1700 KCM AAC 61 str station conductor and the wavetrap facing Elderberry, and CB G2. At Elderberry, replace the wavetrap facing Dumont
- Total Cost ($USD)
- $44,100,000
- Allocated Cost ($USD)
- $3,151,374
- Time Estimate
- 60 to 72 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05DUMONT-05ELDERBERRY 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-245 | 45.0 MW | 24.2% | $10,693,061 |
AG2-363 | 19.6 MW | 10.5% | $4,647,505 |
AG2-364 | 13.0 MW | 7.0% | $3,098,416 |
AG2-453 | 20.2 MW | 10.9% | $4,804,242 |
AG2-660 | 1.5 MW | 0.8% | $366,433 |
AH1-044 | 13.3 MW | 7.1% | $3,151,374 |
AH1-146 | 13.4 MW | 7.2% | $3,186,284 |
AH1-147 | 13.4 MW | 7.2% | $3,186,284 |
AH1-150 | 13.3 MW | 7.1% | $3,151,374 |
AH1-151 | 13.3 MW | 7.1% | $3,151,374 |
AH1-391 | 19.6 MW | 10.6% | $4,663,654 |
System Reinforcement: n9182.0
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- n9182.0 / AEPIMJMS01
- Title
- Rebuild Olive - AF2-359 345kV
- Description
- Rebuild the ~7.3 mile 345 kV line section between Olive and AF2-359 POI. The standard conductor for 345kV lines is 2-bundle 954 ACSR 45/7 RAIL.
- Total Cost ($USD)
- $35,000,000
- Allocated Cost ($USD)
- $3,097,898
- Time Estimate
- 30 to 36 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 22.6 MW | 12.9% | $4,521,241 |
AG2-364 | 15.0 MW | 8.6% | $3,014,160 |
AG2-453 | 23.9 MW | 13.7% | $4,791,085 |
AG2-660 | 1.8 MW | 1.0% | $360,193 |
AH1-044 | 15.5 MW | 8.9% | $3,097,898 |
AH1-146 | 15.7 MW | 9.0% | $3,141,770 |
AH1-147 | 15.7 MW | 9.0% | $3,141,770 |
AH1-150 | 15.5 MW | 8.9% | $3,097,898 |
AH1-151 | 15.5 MW | 8.9% | $3,097,898 |
AH1-234 | 17.0 MW | 9.7% | $3,410,012 |
AH1-714 | 16.6 MW | 9.5% | $3,326,074 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18686
- Title
- 05MADDOX 345.0 kV to 05E LIMA 345.0 kV ckt 1 - String the 2nd conductor
- Description
- AEP owned line; string the 2nd conductor (2-bundle 954 ACSS) ~30.28 miles on the double circuit line & six wire, At East Lima station replace sub conductor & relay trip limit and at Maddox Creek replace 5.0 IPS Sch. 40 bus work, sub conductor & relay trip limit
- Total Cost ($USD)
- $48,000,000
- Allocated Cost ($USD)
- $2,744,065
- Time Estimate
- 24 to 36 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05E LIMA-05MADDOX 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 35.5 MW | 21.3% | $10,215,121 |
AG2-072 | 37.4 MW | 22.4% | $10,764,049 |
AG2-165 | 13.4 MW | 8.0% | $3,845,946 |
AG2-212 | 13.4 MW | 8.0% | $3,845,946 |
AG2-328 | 13.4 MW | 8.0% | $3,845,946 |
AG2-363 | 14.2 MW | 8.5% | $4,075,984 |
AG2-364 | 9.4 MW | 5.7% | $2,717,323 |
AG2-660 | 1.6 MW | 1.0% | $457,488 |
AH1-044 | 9.5 MW | 5.7% | $2,744,065 |
AH1-150 | 9.5 MW | 5.7% | $2,744,065 |
AH1-151 | 9.5 MW | 5.7% | $2,744,065 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.a
- Title
- Reconductor (possible rebuild) 29.61 miles of transmission line and line drops ( line drops at Hayes) on the Beaver - Hayes Ckt 1 345 kV line
- Description
- Reconductor (possible rebuild) 29.61 miles of transmission line and line drops ( line drops at Hayes) on the Beaver - Hayes Ckt 1 345 kV line using dual (2) 954 54/7 "Cardinal" ACSS
- Total Cost ($USD)
- $175,902,477
- Allocated Cost ($USD)
- $2,675,499
- Time Estimate
- 90 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $10,237,972 |
AG2-165 | 8.3 MW | 2.0% | $3,519,183 |
AG2-212 | 8.3 MW | 2.0% | $3,519,183 |
AG2-328 | 8.3 MW | 2.0% | $3,519,183 |
AG2-660 | 1.0 MW | 0.3% | $446,130 |
AH1-044 | 6.3 MW | 1.5% | $2,675,499 |
AH1-150 | 6.3 MW | 1.5% | $2,675,499 |
AH1-151 | 6.3 MW | 1.5% | $2,675,499 |
AH1-690 | 288.2 MW | 69.8% | $122,797,286 |
AH1-711 | 55.9 MW | 13.6% | $23,837,042 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.a
- Title
- Reconductor (possible rebuild) 30.25 miles of 954 ACSR 48/7 transmission line and line drops (line drops at Davis Besse) on the Davis Besse-Hayes 345 kV line
- Description
- Reconductor (possible rebuild) 30.25 miles of 954 ACSR 48/7 transmission line and line drops (line drops at Davis Besse) on the Davis Besse-Hayes 345 kV line using dual (2) 1590 54/19 "Falcon" ACSS
- Total Cost ($USD)
- $179,916,169
- Allocated Cost ($USD)
- $2,563,827
- Time Estimate
- 90 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $9,354,606 |
AG2-165 | 8.1 MW | 1.9% | $3,373,039 |
AG2-212 | 8.1 MW | 1.9% | $3,373,039 |
AG2-328 | 8.1 MW | 1.9% | $3,373,039 |
AG2-660 | 1.0 MW | 0.2% | $427,374 |
AH1-044 | 6.1 MW | 1.4% | $2,563,827 |
AH1-150 | 6.1 MW | 1.4% | $2,563,827 |
AH1-151 | 6.1 MW | 1.4% | $2,563,827 |
AH1-690 | 306.6 MW | 71.2% | $128,073,552 |
AH1-711 | 58.0 MW | 13.5% | $24,250,037 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-015.a
- Title
- Reconductor (possible rebuild) 21.68 miles of transmission line and (1) line drop (line drop at Lemoyne) on the Davis Besse - Lemoyne 345 kV
- Description
- Reconductor (possible rebuild) 21.68 miles of transmission line and (1) line drop (line drop at Lemoyne) on the Davis Besse - Lemoyne 345 kV using dual (2) 1272 54/19 "Pheasant" ACSS
- Total Cost ($USD)
- $126,131,949
- Allocated Cost ($USD)
- $2,142,071
- Time Estimate
- 73 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02LEMOYN 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 19.4 MW | 4.5% | $5,726,959 |
AG2-149 | 26.0 MW | 6.1% | $7,692,075 |
AG2-165 | 9.2 MW | 2.2% | $2,716,066 |
AG2-212 | 9.2 MW | 2.2% | $2,716,066 |
AG2-328 | 9.2 MW | 2.2% | $2,716,066 |
AG2-515 | 20.4 MW | 4.8% | $6,022,672 |
AG2-660 | 1.2 MW | 0.3% | $356,864 |
AH1-044 | 7.3 MW | 1.7% | $2,142,071 |
AH1-150 | 7.3 MW | 1.7% | $2,142,071 |
AH1-151 | 7.3 MW | 1.7% | $2,142,071 |
AH1-690 | 230.6 MW | 54.0% | $68,126,768 |
AH1-711 | 80.0 MW | 18.7% | $23,632,200 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18670
- Title
- 17STILLWELL 345.0 kV to 05DUMONT 345.0 kV ckt 1 - Reconductor and Replace Equipment
- Description
- Rebuild ~8.62 miles of AEP owned 345kV line from Dumont to Stillwell utilizing 3-954 CARDINAL ACSR 54/7. At Dumont, replace the 2-1700 KCM AAC 61 str station conductor, the wavetrap facing Stillwell, the switches for CBs F and F1, and increase the CT thermal limit above 2739.336 MVA. NIPSCO will have to address their elements below 2739.336 SE MVA.
- Total Cost ($USD)
- $26,060,000
- Allocated Cost ($USD)
- $2,011,774
- Time Estimate
- 36 to 48 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05DUMONT-17STILLWELL 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 34.8 MW | 11.2% | $2,925,482 |
AG2-364 | 23.2 MW | 7.5% | $1,950,266 |
AG2-453 | 36.7 MW | 11.8% | $3,085,186 |
AG2-660 | 2.8 MW | 0.9% | $233,917 |
AH1-044 | 23.9 MW | 7.7% | $2,011,774 |
AH1-146 | 24.2 MW | 7.8% | $2,038,027 |
AH1-147 | 24.2 MW | 7.8% | $2,038,027 |
AH1-150 | 23.9 MW | 7.7% | $2,011,774 |
AH1-151 | 23.9 MW | 7.7% | $2,011,774 |
AH1-234 | 26.3 MW | 8.5% | $2,214,222 |
AH1-338 | 21.7 MW | 7.0% | $1,829,773 |
AH1-543 | 18.9 MW | 6.1% | $1,589,376 |
AH1-714 | 25.2 MW | 8.1% | $2,120,403 |
System Reinforcement: n7619.2
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- n7619.2 / AEPI0032b
- Title
- Reconductor/Rebuild 14 miles of ACSR ~ 954 ~ 45/7 ~ RAIL Dumont - Elderberry 345kV line
- Description
- Reconductor/Rebuild 14 miles of ACSR ~ 954 ~ 45/7 ~ RAIL Dumont - Elderberry 345kV line
- Total Cost ($USD)
- $28,000,000
- Allocated Cost ($USD)
- $2,000,872
- Time Estimate
- 24 to 36 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05DUMONT-05ELDERBERRY 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-245 | 45.0 MW | 24.2% | $6,789,245 |
AG2-363 | 19.6 MW | 10.5% | $2,950,797 |
AG2-364 | 13.0 MW | 7.0% | $1,967,248 |
AG2-453 | 20.2 MW | 10.9% | $3,050,313 |
AG2-660 | 1.5 MW | 0.8% | $232,656 |
AH1-044 | 13.3 MW | 7.1% | $2,000,872 |
AH1-146 | 13.4 MW | 7.2% | $2,023,037 |
AH1-147 | 13.4 MW | 7.2% | $2,023,037 |
AH1-150 | 13.3 MW | 7.1% | $2,000,872 |
AH1-151 | 13.3 MW | 7.1% | $2,000,872 |
AH1-391 | 19.6 MW | 10.6% | $2,961,050 |
System Reinforcement
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- (Pending) / CE_NUN_TSS 111
- Title
- TSS 167 Plano new circuit breaker
- Description
- Install a new 345KV Line Circuit Breaker on L16704 at TSS 167 Plano.
- Total Cost ($USD)
- $5,000,000
- Allocated Cost ($USD)
- $1,612,894
- Time Estimate
- 12 to 18 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| ELECT JCT;2B-ELECT JCT;1B 138.0 kV Ckt Z1 line | COMED_P4_111-45-L16704T_SRT-A | |
| ELECT JCT;1B-ELECT JCT;1M 345.0/138.0 kV Ckt 1 transformer | COMED_P4_111-45-L16704T_SRT-A | |
| ELECT JCT;1B-ELECT JCT;1M 138.0 kV Ckt 1 line | COMED_P4_111-45-L16704T_SRT-A |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-660 | 6.0 MW | 3.2% | $161,317 |
AH1-044 | 59.6 MW | 32.3% | $1,612,894 |
AH1-150 | 59.6 MW | 32.3% | $1,612,894 |
AH1-151 | 59.6 MW | 32.3% | $1,612,894 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.d
- Title
- Reconductor (possible rebuild) 345kV 20.75 miles of transmission line and line drops at both remote ends
- Description
- Reconductor (possible rebuild) 345kV 20.75 miles of transmission line and line drops at both remote ends using dual (2) 1590 54/19 "Falcon" ACSS
- Total Cost ($USD)
- $121,594,776
- Allocated Cost ($USD)
- $1,451,212
- Time Estimate
- 71 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $3,726,804 |
AG2-149 | 24.2 MW | 4.0% | $4,914,548 |
AG2-165 | 9.0 MW | 1.5% | $1,840,616 |
AG2-212 | 9.0 MW | 1.5% | $1,840,616 |
AG2-328 | 9.0 MW | 1.5% | $1,840,616 |
AG2-363 | 10.7 MW | 1.8% | $2,168,781 |
AG2-364 | 7.1 MW | 1.2% | $1,445,922 |
AG2-660 | 1.2 MW | 0.2% | $241,903 |
AH1-044 | 7.1 MW | 1.2% | $1,451,212 |
AH1-150 | 7.1 MW | 1.2% | $1,451,212 |
AH1-151 | 7.1 MW | 1.2% | $1,451,212 |
AH1-690 | 441.8 MW | 73.9% | $89,885,811 |
AH1-711 | 45.9 MW | 7.7% | $9,335,525 |
System Reinforcement
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- (Pending) / CE_NUN_COLLINS_TR
- Title
- Collins Station 23 New Transformer
- Description
- Installation of 2nd transformer at Station 23 Collins. Installation to include station work, new breakers, switches and supporting facilities at both 345KV & 765KV level. Possible station civil, grading and yard expansion work required. The estimate given will not include this price and time. Facility Study at Phase III will provide further information.
- Total Cost ($USD)
- $15,600,000
- Allocated Cost ($USD)
- $1,392,229
- Time Estimate
- 24 to 30 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| COLLINS ;-COLLINS ;2M 765.0/345.0 kV Ckt 1 transformer | (Any) | |
| COLLINS ; R-COLLINS ;2M 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 47.5 MW | 13.3% | $2,068,748 |
AG2-364 | 31.7 MW | 8.8% | $1,379,165 |
AG2-453 | 41.1 MW | 11.5% | $1,790,407 |
AG2-660 | 3.7 MW | 1.0% | $161,901 |
AH1-044 | 32.0 MW | 8.9% | $1,392,229 |
AH1-146 | 33.0 MW | 9.2% | $1,437,690 |
AH1-147 | 33.0 MW | 9.2% | $1,437,690 |
AH1-150 | 32.0 MW | 8.9% | $1,392,229 |
AH1-151 | 32.0 MW | 8.9% | $1,392,229 |
AH1-234 | 35.7 MW | 10.0% | $1,553,085 |
AH1-543 | 36.6 MW | 10.2% | $1,594,627 |
System Reinforcement
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- (Pending) / CE_NUN_L17705_1
- Title
- Reconductor Sheffield - Burnham and upgrade station conductor at Burnham
- Description
- This upgrade will be to reconductor the line and upgrade station conductor at Burnham Potential transmission tower replacement required with line reconductor. The estimate for this work will not be known until the Phase 3 system upgrade Facility Study is complete per the PJM process.
- Total Cost ($USD)
- $14,000,000
- Allocated Cost ($USD)
- $1,249,617
- Time Estimate
- 24 to 30 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 17SHEFFIELD-BURNHAM ; B 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 21.4 MW | 12.9% | $1,811,230 |
AG2-364 | 14.3 MW | 8.6% | $1,207,430 |
AG2-453 | 22.4 MW | 13.5% | $1,891,460 |
AG2-660 | 1.7 MW | 1.0% | $145,328 |
AH1-044 | 14.8 MW | 8.9% | $1,249,617 |
AH1-146 | 15.0 MW | 9.1% | $1,267,455 |
AH1-147 | 15.0 MW | 9.1% | $1,267,455 |
AH1-150 | 14.8 MW | 8.9% | $1,249,617 |
AH1-151 | 14.8 MW | 8.9% | $1,249,617 |
AH1-234 | 16.3 MW | 9.8% | $1,376,514 |
AH1-714 | 15.2 MW | 9.2% | $1,284,279 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18635
- Title
- 05MARYSVL_RM 765.0 kV to 05MALIS 765.0 kV ckt 1 - Replace Equipment
- Description
- Replace wave tap at Maliszewski towards Marysville along with circuit breakers, disconnects, and Sub Conductor.
- Total Cost ($USD)
- $24,200,000
- Allocated Cost ($USD)
- $1,039,432
- Time Estimate
- 24 to 36 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05MALIS-05MARYSVL_RM 765.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-104 | 118.0 MW | 29.9% | $7,224,603 |
AG2-106 | 51.6 MW | 13.0% | $3,157,906 |
AG2-107 | 51.6 MW | 13.0% | $3,157,906 |
AG2-165 | 23.9 MW | 6.1% | $1,465,331 |
AG2-212 | 23.9 MW | 6.1% | $1,465,331 |
AG2-328 | 23.9 MW | 6.1% | $1,465,331 |
AG2-660 | 2.8 MW | 0.7% | $173,249 |
AH1-044 | 17.0 MW | 4.3% | $1,039,432 |
AH1-146 | 24.3 MW | 6.1% | $1,486,023 |
AH1-147 | 24.3 MW | 6.1% | $1,486,023 |
AH1-150 | 17.0 MW | 4.3% | $1,039,432 |
AH1-151 | 17.0 MW | 4.3% | $1,039,432 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18634
- Title
- 05MARYSV 765.0 kV to 05MARYSV 345.0 kV ckt 2 - Add second XFMR
- Description
- Add secondary 765/345 kV Transformer to Marysville. Add additional breakers to accommodate new transformer.
- Total Cost ($USD)
- $23,320,000
- Allocated Cost ($USD)
- $1,016,684
- Time Estimate
- 36 to 48 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05MARYSV-05MARYSV 765.0/345.0 kV Ckt 2 transformer | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-104 | 96.6 MW | 42.3% | $9,863,852 |
AG2-106 | 34.1 MW | 14.9% | $3,482,723 |
AG2-107 | 34.1 MW | 14.9% | $3,482,723 |
AG2-165 | 10.8 MW | 4.7% | $1,107,466 |
AG2-212 | 10.8 MW | 4.7% | $1,107,466 |
AG2-328 | 10.8 MW | 4.7% | $1,107,466 |
AG2-660 | 1.2 MW | 0.5% | $118,252 |
AH1-044 | 10.0 MW | 4.4% | $1,016,684 |
AH1-150 | 10.0 MW | 4.4% | $1,016,684 |
AH1-151 | 10.0 MW | 4.4% | $1,016,684 |
System Reinforcement: n7683
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- n7683
- Title
- Rebuild/reconductor 3.05 mi. of the 1275 ACSR/PE 54/19 conductor with 2-954 ACSR 54/7 conductor size with a SN rating of 1410 MVA.
- Description
- Rebuild/reconductor 3.05 mi. of the 1275 ACSR/PE 54/19 conductor with 2-954 ACSR 54/7 conductor size with a SN rating of 1410 MVA.
- Total Cost ($USD)
- $18,460,000
- Allocated Cost ($USD)
- $781,001
- Time Estimate
- 24 to 36 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05MADDOX-AG1-410 TP 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 35.8 MW | 15.7% | $2,893,473 |
AG2-072 | 38.0 MW | 16.7% | $3,077,314 |
AG2-165 | 13.5 MW | 5.9% | $1,093,498 |
AG2-212 | 13.5 MW | 5.9% | $1,093,498 |
AG2-328 | 13.5 MW | 5.9% | $1,093,498 |
AG2-363 | 14.3 MW | 6.3% | $1,160,173 |
AG2-364 | 9.6 MW | 4.2% | $773,395 |
AG2-400 | 19.5 MW | 8.6% | $1,581,826 |
AG2-453 | 20.4 MW | 8.9% | $1,647,691 |
AG2-660 | 1.6 MW | 0.7% | $131,246 |
AH1-044 | 9.7 MW | 4.2% | $781,001 |
AH1-146 | 9.7 MW | 4.3% | $785,694 |
AH1-147 | 9.7 MW | 4.3% | $785,694 |
AH1-150 | 9.7 MW | 4.2% | $781,001 |
AH1-151 | 9.7 MW | 4.2% | $781,001 |
System Reinforcement: n9678.0
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- n9678.0 / CE_NUN_L11215_1
- Title
- Mitigate the sag on L11215
- Description
- Mitigate the sag on L11215. A preliminary estimate for this work is $9M with an estimated construction timeline of 30 months. Upon completion of this work the new line ratings will be 4142/4460/5331/6368/7323 MVA (SN/SLTE/SSTE/SLD/ALDR).
- Total Cost ($USD)
- $9,000,000
- Allocated Cost ($USD)
- $735,575
- Time Estimate
- 30 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| WILTON ;-05DUMONT_RW 765.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 73.9 MW | 11.2% | $1,008,964 |
AG2-364 | 49.3 MW | 7.5% | $672,642 |
AG2-453 | 89.9 MW | 13.6% | $1,227,150 |
AG2-660 | 6.3 MW | 1.0% | $85,535 |
AH1-044 | 53.9 MW | 8.2% | $735,575 |
AH1-146 | 54.4 MW | 8.3% | $743,346 |
AH1-147 | 54.4 MW | 8.3% | $743,346 |
AH1-150 | 53.9 MW | 8.2% | $735,575 |
AH1-151 | 53.9 MW | 8.2% | $735,575 |
AH1-234 | 58.7 MW | 8.9% | $802,235 |
AH1-338 | 49.3 MW | 7.5% | $673,598 |
AH1-714 | 61.2 MW | 9.3% | $836,460 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18679
- Title
- 05GAVIN 765.0 kV to 05MOUNTN 765.0 kV ckt 1 - Replace Equipement
- Description
- At Mountaineer Station replace the following equipment: Gavin D1, Gavin D2, Gavin PH A Trap, Gavin PH C Trap. At Gavin Station Replace the following equipment: Mountaineer CB-B1, Trap - Phase 1, Trap - Phase 2, Trap - Phase 3, Unit 1 Mountaineer B
- Total Cost ($USD)
- $14,200,000
- Allocated Cost ($USD)
- $718,010
- Time Estimate
- 48 to 72 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05GAVIN 765.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-104 | 145.5 MW | 39.4% | $5,601,667 |
AG2-106 | 51.4 MW | 13.9% | $1,977,802 |
AG2-107 | 51.4 MW | 13.9% | $1,977,802 |
AG2-165 | 20.8 MW | 5.6% | $801,735 |
AG2-212 | 20.8 MW | 5.6% | $801,735 |
AG2-328 | 20.8 MW | 5.6% | $801,735 |
AG2-660 | 2.2 MW | 0.6% | $83,493 |
AH1-044 | 18.6 MW | 5.1% | $718,010 |
AH1-150 | 18.6 MW | 5.1% | $718,010 |
AH1-151 | 18.6 MW | 5.1% | $718,010 |
System Reinforcement
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- (Pending) / CE_NUN_L11301_1
- Title
- Sandwich - Waterman L11301 138 Kv Line Upgrades
- Description
- SAG MITIGATION ON A PORTION OF 138KV L11301. STATION CONDUCTOR UPGRADE AT TSS 113 WATERMAN LINE TRAP UPGRADE FOR L11301 AT TSS 113 WATERMAN RECONDUCTOR A PORTION OF L11301, THE ESTIMATE IN COST AND TIME GIVEN DOES NOT INCLUDE POSSIBLE TRANSMISSION TOWER REPLACEMENT. THIS DETERMINATION WILL BE AVAILABLE AT PJM'S PHASE III FACILITY STUDY.
- Total Cost ($USD)
- $9,700,000
- Allocated Cost ($USD)
- $580,562
- Time Estimate
- 16 to 24 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| SANDWICH ; R-WATERMAN ; R 138.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-575 | 41.1 MW | 33.6% | $3,259,051 |
AG2-660 | 0.8 MW | 0.7% | $67,470 |
AH1-044 | 7.3 MW | 6.0% | $580,562 |
AH1-150 | 7.3 MW | 6.0% | $580,562 |
AH1-151 | 7.3 MW | 6.0% | $580,562 |
AH1-338 | 48.1 MW | 39.4% | $3,819,213 |
AH1-341 | 10.2 MW | 8.4% | $812,580 |
System Reinforcement
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- (Pending) / CE_NUN_L18623.2
- Title
- Haumesser - Steward 138 kV Line Reconductor
- Description
- Reconductor line between the two terminal points. Transmission tower replacement might be required. This will be determined during the network upgrade Facility Study per the PJM process. The estimate provided here does not include the tower work. Substation conductor upgrades at TSS 186 Steward & TSS 94 Haumesser Rd.
- Total Cost ($USD)
- $8,500,000
- Allocated Cost ($USD)
- $475,670
- Time Estimate
- 18 to 24 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| HAUMESSER; B-STEWARD ; B 138.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-575 | 9.3 MW | 6.9% | $588,089 |
AG2-660 | 1.1 MW | 0.8% | $69,239 |
AH1-044 | 7.6 MW | 5.6% | $475,670 |
AH1-150 | 7.6 MW | 5.6% | $475,670 |
AH1-151 | 7.6 MW | 5.6% | $475,670 |
AH1-338 | 90.1 MW | 66.7% | $5,669,142 |
AH1-341 | 11.9 MW | 8.8% | $746,520 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18659
- Title
- 05MARYSVL_RS 765.0 kV to 05MARYSV 765.0 kV ckt Z1 - Replace Equipment
- Description
- Replace wave trap, CB-B, and disconnect swiches at Marysville.
- Total Cost ($USD)
- $9,500,000
- Allocated Cost ($USD)
- $466,912
- Time Estimate
- 24 to 36 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05MARYSV-05MARYSVL_RS 765.0 kV Ckt Z1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 62.7 MW | 8.2% | $782,187 |
AG2-072 | 143.4 MW | 18.8% | $1,788,915 |
AG2-164 | 54.0 MW | 7.1% | $673,560 |
AG2-165 | 43.6 MW | 5.7% | $544,470 |
AG2-212 | 43.6 MW | 5.7% | $544,470 |
AG2-219 | 66.0 MW | 8.7% | $823,250 |
AG2-245 | 46.1 MW | 6.0% | $574,740 |
AG2-328 | 43.6 MW | 5.7% | $544,470 |
AG2-453 | 60.3 MW | 7.9% | $752,978 |
AG2-660 | 4.4 MW | 0.6% | $54,650 |
AH1-044 | 37.4 MW | 4.9% | $466,912 |
AH1-146 | 40.7 MW | 5.3% | $507,787 |
AH1-147 | 40.7 MW | 5.3% | $507,787 |
AH1-150 | 37.4 MW | 4.9% | $466,912 |
AH1-151 | 37.4 MW | 4.9% | $466,912 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18677
- Title
- 05DUMONT_RW 765.0 kV to 05DUMONT 765.0 kV ckt Z1 - Replace Breaker
- Description
- Replace 765kV CB B at Dumont
- Total Cost ($USD)
- $4,000,000
- Allocated Cost ($USD)
- $307,333
- Time Estimate
- 36 to 42 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05DUMONT-05DUMONT_RW 765.0 kV Ckt Z1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 73.9 MW | 10.5% | $421,558 |
AG2-364 | 49.3 MW | 7.0% | $281,039 |
AG2-453 | 89.9 MW | 12.8% | $512,720 |
AG2-660 | 6.3 MW | 0.9% | $35,738 |
AH1-044 | 53.9 MW | 7.7% | $307,333 |
AH1-146 | 54.4 MW | 7.8% | $310,580 |
AH1-147 | 54.4 MW | 7.8% | $310,580 |
AH1-150 | 53.9 MW | 7.7% | $307,333 |
AH1-151 | 53.9 MW | 7.7% | $307,333 |
AH1-234 | 58.7 MW | 8.4% | $335,185 |
AH1-338 | 49.3 MW | 7.0% | $281,438 |
AH1-543 | 42.0 MW | 6.0% | $239,681 |
AH1-714 | 61.2 MW | 8.7% | $349,484 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18689
- Title
- AG1-410 TP 345.0 kV to 05MADDOX 345.0 kV ckt 1 - string the 2nd circuit
- Description
- AEP owned line; string the 2nd circuit on the rebuilt double circuit line, ~ 2.85 miles of 2-bundle 1590 ACSR conductor. At Maddox Creek: Replace 345kV circuit breaker B2, subconductor, disconnect switches.
- Total Cost ($USD)
- $7,250,000
- Allocated Cost ($USD)
- $306,731
- Time Estimate
- 24 to 36 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05MADDOX-AG1-410 TP 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 35.8 MW | 15.7% | $1,136,386 |
AG2-072 | 38.0 MW | 16.7% | $1,208,588 |
AG2-165 | 13.5 MW | 5.9% | $429,462 |
AG2-212 | 13.5 MW | 5.9% | $429,462 |
AG2-328 | 13.5 MW | 5.9% | $429,462 |
AG2-363 | 14.3 MW | 6.3% | $455,647 |
AG2-364 | 9.6 MW | 4.2% | $303,744 |
AG2-400 | 19.5 MW | 8.6% | $621,248 |
AG2-453 | 20.4 MW | 8.9% | $647,116 |
AG2-660 | 1.6 MW | 0.7% | $51,546 |
AH1-044 | 9.7 MW | 4.2% | $306,731 |
AH1-146 | 9.7 MW | 4.3% | $308,574 |
AH1-147 | 9.7 MW | 4.3% | $308,574 |
AH1-150 | 9.7 MW | 4.2% | $306,731 |
AH1-151 | 9.7 MW | 4.2% | $306,731 |
System Reinforcement: n6600
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- n6600 / AEPI0001a
- Title
- Replace Dumont Circuit Breaker B1
- Description
- Replace Dumont Circuit Breaker B1 [Breaker (3000A) Non oil - Dumont]
- Total Cost ($USD)
- $3,900,000
- Allocated Cost ($USD)
- $299,650
- Time Estimate
- 18 to 24 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05DUMONT-05DUMONT_RW 765.0 kV Ckt Z1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 73.9 MW | 10.5% | $411,019 |
AG2-364 | 49.3 MW | 7.0% | $274,013 |
AG2-453 | 89.9 MW | 12.8% | $499,902 |
AG2-660 | 6.3 MW | 0.9% | $34,844 |
AH1-044 | 53.9 MW | 7.7% | $299,650 |
AH1-146 | 54.4 MW | 7.8% | $302,815 |
AH1-147 | 54.4 MW | 7.8% | $302,815 |
AH1-150 | 53.9 MW | 7.7% | $299,650 |
AH1-151 | 53.9 MW | 7.7% | $299,650 |
AH1-234 | 58.7 MW | 8.4% | $326,805 |
AH1-338 | 49.3 MW | 7.0% | $274,402 |
AH1-543 | 42.0 MW | 6.0% | $233,689 |
AH1-714 | 61.2 MW | 8.7% | $340,747 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18707
- Title
- 05ALLEN 345.0 kV to 05RPMONE 345.0 kV ckt 1 - Replace Equipment
- Description
- At RP Mone: Replace CB B and B2 and associated disconnect switches. Replace 2 - 1700 KCM AAC station conductor. At Allen: Replace the disconnect switches for CBs C and C2 at Allen. Replace 2 - 2000 KCM AAC station conductor. B3851.1 to rebuild the Allen - RP Mone line needs to be completed. CB B is also be proposed to be replaced on another flowgate
- Total Cost ($USD)
- $5,000,000
- Allocated Cost ($USD)
- $255,176
- Time Estimate
- 36 to 48 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05RPMONE-05ALLEN 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 36.4 MW | 18.7% | $933,382 |
AG2-165 | 13.9 MW | 7.1% | $356,344 |
AG2-212 | 13.9 MW | 7.1% | $356,344 |
AG2-328 | 13.9 MW | 7.1% | $356,344 |
AG2-363 | 14.8 MW | 7.6% | $379,162 |
AG2-364 | 9.9 MW | 5.1% | $252,766 |
AG2-400 | 19.8 MW | 10.1% | $506,712 |
AG2-453 | 21.0 MW | 10.8% | $537,555 |
AG2-660 | 1.7 MW | 0.9% | $42,534 |
AH1-044 | 10.0 MW | 5.1% | $255,176 |
AH1-146 | 10.0 MW | 5.1% | $256,663 |
AH1-147 | 10.0 MW | 5.1% | $256,663 |
AH1-150 | 10.0 MW | 5.1% | $255,176 |
AH1-151 | 10.0 MW | 5.1% | $255,176 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18732
- Title
- 05RPMONE 345kV to AG1-410 TP 345kV ckt 1 - Replace Equipment
- Description
- At R.P. Mone: Replace 345kV circuit breakers B & B1, Bus bar 4 x 3/4 Ph C, angle bus buar 4x4x1/4 Ph B, sub conductor, disconnect switches on B and B1 breakers
- Total Cost ($USD)
- $4,500,000
- Allocated Cost ($USD)
- $190,396
- Time Estimate
- 36 to 48 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05RPMONE-AG1-410 TP 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 35.8 MW | 15.7% | $705,383 |
AG2-072 | 38.0 MW | 16.7% | $750,201 |
AG2-165 | 13.5 MW | 5.9% | $266,578 |
AG2-212 | 13.5 MW | 5.9% | $266,578 |
AG2-328 | 13.5 MW | 5.9% | $266,578 |
AG2-363 | 14.3 MW | 6.3% | $282,832 |
AG2-364 | 9.6 MW | 4.2% | $188,541 |
AG2-400 | 19.5 MW | 8.6% | $385,624 |
AG2-453 | 20.4 MW | 8.9% | $401,681 |
AG2-660 | 1.6 MW | 0.7% | $31,739 |
AH1-044 | 9.7 MW | 4.2% | $190,396 |
AH1-146 | 9.7 MW | 4.3% | $191,540 |
AH1-147 | 9.7 MW | 4.3% | $191,540 |
AH1-150 | 9.7 MW | 4.2% | $190,396 |
AH1-151 | 9.7 MW | 4.2% | $190,396 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18819
- Title
- 06PIERCE 345kV to 05MARQUIS 345kV ckt 1 - Replace Equipment
- Description
- At Pierce replace the following equipment: Switch 444, 446, 447, and 449, Bus, Risers, Jumpers, Wave Trap, and Line Relay At Don Marquis 345kV replace the following equipment: Circuit Breaker B2, Risers, and Line Reactor.
- Total Cost ($USD)
- $3,300,000
- Allocated Cost ($USD)
- $137,152
- Time Estimate
- 36 to 48 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05MARQUI-06PIERCE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-072 | 56.2 MW | 37.2% | $1,226,646 |
AG2-164 | 18.7 MW | 12.3% | $406,897 |
AG2-219 | 22.8 MW | 15.1% | $497,307 |
AG2-363 | 9.6 MW | 6.4% | $209,698 |
AG2-364 | 6.4 MW | 4.2% | $139,813 |
AG2-660 | 1.0 MW | 0.7% | $22,859 |
AH1-044 | 6.3 MW | 4.2% | $137,152 |
AH1-150 | 6.3 MW | 4.2% | $137,152 |
AH1-151 | 6.3 MW | 4.2% | $137,152 |
AH1-537 | 17.7 MW | 11.7% | $385,325 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.d
- Title
- Upgrade (4) circuit breakers at Beaver and Hayes (B88, B115, B3, B6)
- Description
- Upgrade (4) circuit breakers at Beaver and Hayes (B88, B115, B3, B6)
- Total Cost ($USD)
- $7,937,520
- Allocated Cost ($USD)
- $120,731
- Time Estimate
- 60 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $461,984 |
AG2-165 | 8.3 MW | 2.0% | $158,802 |
AG2-212 | 8.3 MW | 2.0% | $158,802 |
AG2-328 | 8.3 MW | 2.0% | $158,802 |
AG2-660 | 1.0 MW | 0.3% | $20,131 |
AH1-044 | 6.3 MW | 1.5% | $120,731 |
AH1-150 | 6.3 MW | 1.5% | $120,731 |
AH1-151 | 6.3 MW | 1.5% | $120,731 |
AH1-690 | 288.2 MW | 69.8% | $5,541,172 |
AH1-711 | 55.9 MW | 13.6% | $1,075,636 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18751
- Title
- 05KYGER 345kV to 05SPORN 345kV ckt 1 - Replace Equipment and Sag Study
- Description
- Sag study Sporn - Kyger Creek line and at Kyger Creek Replace the following equipment: 2156.0 KCM ACSR (84/19), 3000A Switch, CB-BB, 2870 MCM ACSR (Bus), GCB AA, Wave Trap, Line Relay/CT, Meters, Switch 104, and Switch 10
- Total Cost ($USD)
- $5,052,000
- Allocated Cost ($USD)
- $120,609
- Time Estimate
- 48 to 60 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05SPORN-06KYGER 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-072 | 46.4 MW | 15.9% | $801,284 |
AG2-164 | 16.2 MW | 5.5% | $280,050 |
AG2-219 | 18.7 MW | 6.4% | $323,479 |
AG2-363 | 10.6 MW | 3.6% | $182,685 |
AG2-364 | 7.0 MW | 2.4% | $121,784 |
AG2-660 | 1.2 MW | 0.4% | $20,099 |
AH1-044 | 7.0 MW | 2.4% | $120,609 |
AH1-055 | 84.4 MW | 28.9% | $1,458,266 |
AH1-150 | 7.0 MW | 2.4% | $120,609 |
AH1-151 | 7.0 MW | 2.4% | $120,609 |
AH1-537 | 49.7 MW | 17.0% | $858,815 |
AH1-721 | 37.2 MW | 12.7% | $643,710 |
System Reinforcement: n8389
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- n8389 / CE_N8389_116BT3-4_1
- Title
- TSS 116 Replace Station Conductor
- Description
- ComEd 345kV BT3-4 at TSS 116 SSTE rating is 2083 MVA. The upgrade will be to replace the station conductor at TSS 116. A preliminary estimate for the upgrade is $1M. A preliminary construction timeline is 24 months. Upon completion of the upgrade the ratings will be 2236/2874/3009/3358 MVA (SN/SLTE/SSTE/SLD.
- Total Cost ($USD)
- $1,000,000
- Allocated Cost ($USD)
- $107,699
- Time Estimate
- 24 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| GOODINGS ;3B-GOODINGS ;4B 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 40.9 MW | 26.6% | $266,339 |
AG2-364 | 27.3 MW | 17.8% | $177,561 |
AG2-660 | 1.9 MW | 1.3% | $12,521 |
AH1-044 | 16.6 MW | 10.8% | $107,699 |
AH1-146 | 16.9 MW | 11.0% | $110,242 |
AH1-147 | 16.9 MW | 11.0% | $110,242 |
AH1-150 | 16.6 MW | 10.8% | $107,699 |
AH1-151 | 16.6 MW | 10.8% | $107,699 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18680
- Title
- 05MARYSV 765.0 kV to 05MARYSVL_RM 765.0 kV ckt Z1 - Replace Equipment
- Description
- Replace wave trap and associated equipment on Marysville Reactor towards Maliszewski.
- Total Cost ($USD)
- $2,200,000
- Allocated Cost ($USD)
- $94,494
- Time Estimate
- 24 to 36 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05MARYSV-05MARYSVL_RM 765.0 kV Ckt Z1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-104 | 118.0 MW | 29.9% | $656,782 |
AG2-106 | 51.6 MW | 13.0% | $287,082 |
AG2-107 | 51.6 MW | 13.0% | $287,082 |
AG2-165 | 23.9 MW | 6.1% | $133,212 |
AG2-212 | 23.9 MW | 6.1% | $133,212 |
AG2-328 | 23.9 MW | 6.1% | $133,212 |
AG2-660 | 2.8 MW | 0.7% | $15,750 |
AH1-044 | 17.0 MW | 4.3% | $94,494 |
AH1-146 | 24.3 MW | 6.1% | $135,093 |
AH1-147 | 24.3 MW | 6.1% | $135,093 |
AH1-150 | 17.0 MW | 4.3% | $94,494 |
AH1-151 | 17.0 MW | 4.3% | $94,494 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.g
- Title
- Upgrade (2) 345kV circuit breakers at Bayshore and (2) at Davis Besse
- Description
- Upgrade (2) 345kV circuit breakers at Bayshore and (2) at Davis Besse
- Total Cost ($USD)
- $7,786,806
- Allocated Cost ($USD)
- $92,934
- Time Estimate
- 60 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $238,661 |
AG2-149 | 24.2 MW | 4.0% | $314,723 |
AG2-165 | 9.0 MW | 1.5% | $117,871 |
AG2-212 | 9.0 MW | 1.5% | $117,871 |
AG2-328 | 9.0 MW | 1.5% | $117,871 |
AG2-363 | 10.7 MW | 1.8% | $138,887 |
AG2-364 | 7.1 MW | 1.2% | $92,595 |
AG2-660 | 1.2 MW | 0.2% | $15,491 |
AH1-044 | 7.1 MW | 1.2% | $92,934 |
AH1-150 | 7.1 MW | 1.2% | $92,934 |
AH1-151 | 7.1 MW | 1.2% | $92,934 |
AH1-690 | 441.8 MW | 73.9% | $5,756,196 |
AH1-711 | 45.9 MW | 7.7% | $597,838 |
System Reinforcement: n7619.1
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- n7619.1 / AEPI0032a
- Title
- Replace 3000A non oil Circuit Breaker at Dumont
- Description
- Total Cost ($USD)
- $1,300,000
- Allocated Cost ($USD)
- $92,898
- Time Estimate
- 18 to 24 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05DUMONT-05ELDERBERRY 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-245 | 45.0 MW | 24.2% | $315,215 |
AG2-363 | 19.6 MW | 10.5% | $137,001 |
AG2-364 | 13.0 MW | 7.0% | $91,337 |
AG2-453 | 20.2 MW | 10.9% | $141,622 |
AG2-660 | 1.5 MW | 0.8% | $10,802 |
AH1-044 | 13.3 MW | 7.1% | $92,898 |
AH1-146 | 13.4 MW | 7.2% | $93,927 |
AH1-147 | 13.4 MW | 7.2% | $93,927 |
AH1-150 | 13.3 MW | 7.1% | $92,898 |
AH1-151 | 13.3 MW | 7.1% | $92,898 |
AH1-391 | 19.6 MW | 10.6% | $137,477 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.j
- Title
- Upgrade (6) disconnect switches at Davis Besse (D27,28,29,30,34625,37) and (5) disconnect switches at Hayes (D20,19,16,13,14)
- Description
- Upgrade (6) disconnect switches at Davis Besse (D27,28,29,30,34625,37) and (5) disconnect switches at Hayes (D20,19,16,13,14)
- Total Cost ($USD)
- $4,525,814
- Allocated Cost ($USD)
- $64,493
- Time Estimate
- 31 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $235,316 |
AG2-165 | 8.1 MW | 1.9% | $84,849 |
AG2-212 | 8.1 MW | 1.9% | $84,849 |
AG2-328 | 8.1 MW | 1.9% | $84,849 |
AG2-660 | 1.0 MW | 0.2% | $10,751 |
AH1-044 | 6.1 MW | 1.4% | $64,493 |
AH1-150 | 6.1 MW | 1.4% | $64,493 |
AH1-151 | 6.1 MW | 1.4% | $64,493 |
AH1-690 | 306.6 MW | 71.2% | $3,221,706 |
AH1-711 | 58.0 MW | 13.5% | $610,013 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.g
- Title
- Upgrade B66 and B67 circuit breakers at Davis Besse substation
- Description
- Upgrade B66 and B67 circuit breakers at Davis Besse substation
- Total Cost ($USD)
- $3,893,404
- Allocated Cost ($USD)
- $55,481
- Time Estimate
- 56 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $202,435 |
AG2-165 | 8.1 MW | 1.9% | $72,993 |
AG2-212 | 8.1 MW | 1.9% | $72,993 |
AG2-328 | 8.1 MW | 1.9% | $72,993 |
AG2-660 | 1.0 MW | 0.2% | $9,248 |
AH1-044 | 6.1 MW | 1.4% | $55,481 |
AH1-150 | 6.1 MW | 1.4% | $55,481 |
AH1-151 | 6.1 MW | 1.4% | $55,481 |
AH1-690 | 306.6 MW | 71.2% | $2,771,525 |
AH1-711 | 58.0 MW | 13.5% | $524,773 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.d
- Title
- Upgrade (2) B18 & B12 345 kV Ciruit Breakers at Hayes
- Description
- Upgrade (2) B18 & B12 345 kV Ciruit Breakers at Hayes
- Total Cost ($USD)
- $3,893,404
- Allocated Cost ($USD)
- $55,481
- Time Estimate
- 56 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $202,435 |
AG2-165 | 8.1 MW | 1.9% | $72,993 |
AG2-212 | 8.1 MW | 1.9% | $72,993 |
AG2-328 | 8.1 MW | 1.9% | $72,993 |
AG2-660 | 1.0 MW | 0.2% | $9,248 |
AH1-044 | 6.1 MW | 1.4% | $55,481 |
AH1-150 | 6.1 MW | 1.4% | $55,481 |
AH1-151 | 6.1 MW | 1.4% | $55,481 |
AH1-690 | 306.6 MW | 71.2% | $2,771,525 |
AH1-711 | 58.0 MW | 13.5% | $524,773 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-015.b
- Title
- Upgrade (4) L300 wavetraps at Davis Besse and Lemoyne
- Description
- Upgrade (4) L300 wavetraps at Davis Besse and Lemoyne
- Total Cost ($USD)
- $1,132,675
- Allocated Cost ($USD)
- $19,236
- Time Estimate
- 22 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02LEMOYN 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 19.4 MW | 4.5% | $51,429 |
AG2-149 | 26.0 MW | 6.1% | $69,075 |
AG2-165 | 9.2 MW | 2.2% | $24,390 |
AG2-212 | 9.2 MW | 2.2% | $24,390 |
AG2-328 | 9.2 MW | 2.2% | $24,390 |
AG2-515 | 20.4 MW | 4.8% | $54,084 |
AG2-660 | 1.2 MW | 0.3% | $3,205 |
AH1-044 | 7.3 MW | 1.7% | $19,236 |
AH1-150 | 7.3 MW | 1.7% | $19,236 |
AH1-151 | 7.3 MW | 1.7% | $19,236 |
AH1-690 | 230.6 MW | 54.0% | $611,784 |
AH1-711 | 80.0 MW | 18.7% | $212,219 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.h
- Title
- Upgrade the B88 and B115 CTs at Beaver
- Description
- Upgrade the B88 and B115 CTs at Beaver
- Total Cost ($USD)
- $1,258,596
- Allocated Cost ($USD)
- $19,143
- Time Estimate
- 21 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $73,253 |
AG2-165 | 8.3 MW | 2.0% | $25,180 |
AG2-212 | 8.3 MW | 2.0% | $25,180 |
AG2-328 | 8.3 MW | 2.0% | $25,180 |
AG2-660 | 1.0 MW | 0.3% | $3,192 |
AH1-044 | 6.3 MW | 1.5% | $19,143 |
AH1-150 | 6.3 MW | 1.5% | $19,143 |
AH1-151 | 6.3 MW | 1.5% | $19,143 |
AH1-690 | 288.2 MW | 69.8% | $878,624 |
AH1-711 | 55.9 MW | 13.6% | $170,556 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.e
- Title
- Upgrade (2) B12 and B18 CTs at Hayes
- Description
- Upgrade (2) B12 and B18 CTs at Hayes
- Total Cost ($USD)
- $1,258,596
- Allocated Cost ($USD)
- $17,935
- Time Estimate
- 21 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $65,440 |
AG2-165 | 8.1 MW | 1.9% | $23,596 |
AG2-212 | 8.1 MW | 1.9% | $23,596 |
AG2-328 | 8.1 MW | 1.9% | $23,596 |
AG2-660 | 1.0 MW | 0.2% | $2,990 |
AH1-044 | 6.1 MW | 1.4% | $17,935 |
AH1-150 | 6.1 MW | 1.4% | $17,935 |
AH1-151 | 6.1 MW | 1.4% | $17,935 |
AH1-690 | 306.6 MW | 71.2% | $895,933 |
AH1-711 | 58.0 MW | 13.5% | $169,640 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.c
- Title
- Upgrade (2) Wave Traps at Davis Besse and (2) Wave Traps at Hayes
- Description
- Upgrade (2) Wave Traps at Davis Besse and (2) Wave Traps at Hayes
- Total Cost ($USD)
- $1,215,695
- Allocated Cost ($USD)
- $17,324
- Time Estimate
- 20 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $63,209 |
AG2-165 | 8.1 MW | 1.9% | $22,792 |
AG2-212 | 8.1 MW | 1.9% | $22,792 |
AG2-328 | 8.1 MW | 1.9% | $22,792 |
AG2-660 | 1.0 MW | 0.2% | $2,888 |
AH1-044 | 6.1 MW | 1.4% | $17,324 |
AH1-150 | 6.1 MW | 1.4% | $17,324 |
AH1-151 | 6.1 MW | 1.4% | $17,324 |
AH1-690 | 306.6 MW | 71.2% | $865,394 |
AH1-711 | 58.0 MW | 13.5% | $163,858 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18687
- Title
- 05HANGRCK_RJ 765.0 kV to 05HANG R 765.0 kV ckt Z1 - Replace Equipment
- Description
- At Hanging Rock Station replace the following equipment: D1S1 PH A, D1S1 PH B, D1S1 PH C, D1S2 PH A, D1S2 PH B, D1S2 PH C, D2S1 PH A, D2S1 PH B, D2S1 PH C, D2S2 PH A, D2S2 PH B, D2S2 PH C, Jefferson Trap PH A, Jefferson Trap PH B, Jefferson Trap PH C
- Total Cost ($USD)
- $500,000
- Allocated Cost ($USD)
- $15,819
- Time Estimate
- 30 to 36 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05HANG R-05HANGRCK_RJ 765.0 kV Ckt Z1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-072 | 200.1 MW | 33.5% | $167,271 |
AG2-164 | 66.6 MW | 11.1% | $55,708 |
AG2-165 | 29.3 MW | 4.9% | $24,516 |
AG2-212 | 29.3 MW | 4.9% | $24,516 |
AG2-219 | 81.4 MW | 13.6% | $68,088 |
AG2-328 | 29.3 MW | 4.9% | $24,516 |
AG2-331 | 54.3 MW | 9.1% | $45,381 |
AG2-363 | 28.6 MW | 4.8% | $23,947 |
AG2-364 | 19.1 MW | 3.2% | $15,965 |
AG2-660 | 3.2 MW | 0.5% | $2,637 |
AH1-044 | 18.9 MW | 3.2% | $15,819 |
AH1-150 | 18.9 MW | 3.2% | $15,819 |
AH1-151 | 18.9 MW | 3.2% | $15,819 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.b
- Title
- Upgrade (3) 345kV bus and line side disconnect switches at Davis Besse substation at Davis Besse
- Description
- Upgrade (3) 345kV bus and line side disconnect switches at Davis Besse substation at Davis Besse
- Total Cost ($USD)
- $1,324,127
- Allocated Cost ($USD)
- $15,803
- Time Estimate
- 37 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $40,584 |
AG2-149 | 24.2 MW | 4.0% | $53,518 |
AG2-165 | 9.0 MW | 1.5% | $20,044 |
AG2-212 | 9.0 MW | 1.5% | $20,044 |
AG2-328 | 9.0 MW | 1.5% | $20,044 |
AG2-363 | 10.7 MW | 1.8% | $23,617 |
AG2-364 | 7.1 MW | 1.2% | $15,746 |
AG2-660 | 1.2 MW | 0.2% | $2,634 |
AH1-044 | 7.1 MW | 1.2% | $15,803 |
AH1-150 | 7.1 MW | 1.2% | $15,803 |
AH1-151 | 7.1 MW | 1.2% | $15,803 |
AH1-690 | 441.8 MW | 73.9% | $978,827 |
AH1-711 | 45.9 MW | 7.7% | $101,661 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.j
- Title
- Upgrade the B88 and B3 impedance relays at Beaver and Hayes
- Description
- Upgrade the B88 and B3 impedance relays at Beaver and Hayes
- Total Cost ($USD)
- $1,019,790
- Allocated Cost ($USD)
- $15,511
- Time Estimate
- 19 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $59,354 |
AG2-165 | 8.3 MW | 2.0% | $20,402 |
AG2-212 | 8.3 MW | 2.0% | $20,402 |
AG2-328 | 8.3 MW | 2.0% | $20,402 |
AG2-660 | 1.0 MW | 0.3% | $2,586 |
AH1-044 | 6.3 MW | 1.5% | $15,511 |
AH1-150 | 6.3 MW | 1.5% | $15,511 |
AH1-151 | 6.3 MW | 1.5% | $15,511 |
AH1-690 | 288.2 MW | 69.8% | $711,914 |
AH1-711 | 55.9 MW | 13.6% | $138,195 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.i
- Title
- Upgrade (2) 9.6 Ohms impedance relays at Hayes and (2) 12.9 Ohms impedance relays at Davis Besse
- Description
- Upgrade (2) 9.6 Ohms impedance relays at Hayes and (2) 12.9 Ohms impedance relays at Davis Besse
- Total Cost ($USD)
- $1,019,790
- Allocated Cost ($USD)
- $14,532
- Time Estimate
- 19 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $53,023 |
AG2-165 | 8.1 MW | 1.9% | $19,119 |
AG2-212 | 8.1 MW | 1.9% | $19,119 |
AG2-328 | 8.1 MW | 1.9% | $19,119 |
AG2-660 | 1.0 MW | 0.2% | $2,422 |
AH1-044 | 6.1 MW | 1.4% | $14,532 |
AH1-150 | 6.1 MW | 1.4% | $14,532 |
AH1-151 | 6.1 MW | 1.4% | $14,532 |
AH1-690 | 306.6 MW | 71.2% | $725,939 |
AH1-711 | 58.0 MW | 13.5% | $137,453 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.f
- Title
- Upgrade (2) 345kV Wave Traps at Bayshore and (2) at Davis Besse
- Description
- Upgrade (2) 345kV Wave Traps at Bayshore and (2) at Davis Besse
- Total Cost ($USD)
- $1,215,694
- Allocated Cost ($USD)
- $14,509
- Time Estimate
- 22 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $37,260 |
AG2-149 | 24.2 MW | 4.0% | $49,135 |
AG2-165 | 9.0 MW | 1.5% | $18,402 |
AG2-212 | 9.0 MW | 1.5% | $18,402 |
AG2-328 | 9.0 MW | 1.5% | $18,402 |
AG2-363 | 10.7 MW | 1.8% | $21,683 |
AG2-364 | 7.1 MW | 1.2% | $14,456 |
AG2-660 | 1.2 MW | 0.2% | $2,419 |
AH1-044 | 7.1 MW | 1.2% | $14,509 |
AH1-150 | 7.1 MW | 1.2% | $14,509 |
AH1-151 | 7.1 MW | 1.2% | $14,509 |
AH1-690 | 441.8 MW | 73.9% | $898,671 |
AH1-711 | 45.9 MW | 7.7% | $93,336 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.a
- Title
- Upgrade (4) 1024.5 ACAR 24/13 sub conductors at Davis Besse
- Description
- Upgrade (4) 1024.5 ACAR 24/13 sub conductors at Davis Besse
- Total Cost ($USD)
- $1,099,401
- Allocated Cost ($USD)
- $13,121
- Time Estimate
- 14 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $33,696 |
AG2-149 | 24.2 MW | 4.0% | $44,435 |
AG2-165 | 9.0 MW | 1.5% | $16,642 |
AG2-212 | 9.0 MW | 1.5% | $16,642 |
AG2-328 | 9.0 MW | 1.5% | $16,642 |
AG2-363 | 10.7 MW | 1.8% | $19,609 |
AG2-364 | 7.1 MW | 1.2% | $13,073 |
AG2-660 | 1.2 MW | 0.2% | $2,187 |
AH1-044 | 7.1 MW | 1.2% | $13,121 |
AH1-150 | 7.1 MW | 1.2% | $13,121 |
AH1-151 | 7.1 MW | 1.2% | $13,121 |
AH1-690 | 441.8 MW | 73.9% | $812,704 |
AH1-711 | 45.9 MW | 7.7% | $84,407 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.h
- Title
- Upgrade B66 (1) meter and (1) relay thermals and B67 (1) meter thermal at Davis Besse substation
- Description
- Upgrade B66 (1) meter and (1) relay thermals and B67 (1) meter thermal at Davis Besse substation
- Total Cost ($USD)
- $852,462
- Allocated Cost ($USD)
- $12,148
- Time Estimate
- 19 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $44,323 |
AG2-165 | 8.1 MW | 1.9% | $15,982 |
AG2-212 | 8.1 MW | 1.9% | $15,982 |
AG2-328 | 8.1 MW | 1.9% | $15,982 |
AG2-660 | 1.0 MW | 0.2% | $2,025 |
AH1-044 | 6.1 MW | 1.4% | $12,148 |
AH1-150 | 6.1 MW | 1.4% | $12,148 |
AH1-151 | 6.1 MW | 1.4% | $12,148 |
AH1-690 | 306.6 MW | 71.2% | $606,826 |
AH1-711 | 58.0 MW | 13.5% | $114,899 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.k
- Title
- Upgrade the B34545 and 34562 (4) Meter and (2) Relay Thermals at Bayshore and Davis Besse
- Description
- Upgrade the B34545 and 34562 (4) Meter and (2) Relay Thermals at Bayshore and Davis Besse
- Total Cost ($USD)
- $998,835
- Allocated Cost ($USD)
- $11,921
- Time Estimate
- 19 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $30,614 |
AG2-149 | 24.2 MW | 4.0% | $40,370 |
AG2-165 | 9.0 MW | 1.5% | $15,120 |
AG2-212 | 9.0 MW | 1.5% | $15,120 |
AG2-328 | 9.0 MW | 1.5% | $15,120 |
AG2-363 | 10.7 MW | 1.8% | $17,815 |
AG2-364 | 7.1 MW | 1.2% | $11,877 |
AG2-660 | 1.2 MW | 0.2% | $1,987 |
AH1-044 | 7.1 MW | 1.2% | $11,921 |
AH1-150 | 7.1 MW | 1.2% | $11,921 |
AH1-151 | 7.1 MW | 1.2% | $11,921 |
AH1-690 | 441.8 MW | 73.9% | $738,363 |
AH1-711 | 45.9 MW | 7.7% | $76,686 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.c
- Title
- Upgrade (2) L3000 wavetraps at Beaver and Hayes
- Description
- Upgrade (2) L3000 wavetraps at Beaver and Hayes
- Total Cost ($USD)
- $729,124
- Allocated Cost ($USD)
- $11,090
- Time Estimate
- 18 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $42,437 |
AG2-165 | 8.3 MW | 2.0% | $14,587 |
AG2-212 | 8.3 MW | 2.0% | $14,587 |
AG2-328 | 8.3 MW | 2.0% | $14,587 |
AG2-660 | 1.0 MW | 0.3% | $1,849 |
AH1-044 | 6.3 MW | 1.5% | $11,090 |
AH1-150 | 6.3 MW | 1.5% | $11,090 |
AH1-151 | 6.3 MW | 1.5% | $11,090 |
AH1-690 | 288.2 MW | 69.8% | $509,000 |
AH1-711 | 55.9 MW | 13.6% | $98,806 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.f
- Title
- Upgrade the B6 CT at Hayes
- Description
- Upgrade the B6 CT at Hayes
- Total Cost ($USD)
- $727,300
- Allocated Cost ($USD)
- $11,062
- Time Estimate
- 20 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $42,331 |
AG2-165 | 8.3 MW | 2.0% | $14,551 |
AG2-212 | 8.3 MW | 2.0% | $14,551 |
AG2-328 | 8.3 MW | 2.0% | $14,551 |
AG2-660 | 1.0 MW | 0.3% | $1,845 |
AH1-044 | 6.3 MW | 1.5% | $11,062 |
AH1-150 | 6.3 MW | 1.5% | $11,062 |
AH1-151 | 6.3 MW | 1.5% | $11,062 |
AH1-690 | 288.2 MW | 69.8% | $507,727 |
AH1-711 | 55.9 MW | 13.6% | $98,558 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.g
- Title
- Upgrade (3) 1590 AAC line drops at Beaver (line drop to WT, Phase 1&3 "B-B", and SHARED NODE TO: WT, PH 2 / 5" AL, PH 1&3)
- Description
- Upgrade (3) 1590 AAC line drops at Beaver (line drop to WT, Phase 1&3 "B-B", and SHARED NODE TO: WT, PH 2 / 5" AL, PH 1&3) using dual (2) 954 54/7 "Cardinal" ACSS
- Total Cost ($USD)
- $591,863
- Allocated Cost ($USD)
- $9,002
- Time Estimate
- 18 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $34,448 |
AG2-165 | 8.3 MW | 2.0% | $11,841 |
AG2-212 | 8.3 MW | 2.0% | $11,841 |
AG2-328 | 8.3 MW | 2.0% | $11,841 |
AG2-660 | 1.0 MW | 0.3% | $1,501 |
AH1-044 | 6.3 MW | 1.5% | $9,002 |
AH1-150 | 6.3 MW | 1.5% | $9,002 |
AH1-151 | 6.3 MW | 1.5% | $9,002 |
AH1-690 | 288.2 MW | 69.8% | $413,179 |
AH1-711 | 55.9 MW | 13.6% | $80,205 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.i
- Title
- Upgrade B34544 CT at BAYSHORE
- Description
- Upgrade B34544 CT at BAYSHORE
- Total Cost ($USD)
- $712,356
- Allocated Cost ($USD)
- $8,502
- Time Estimate
- 20 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $21,833 |
AG2-149 | 24.2 MW | 4.0% | $28,792 |
AG2-165 | 9.0 MW | 1.5% | $10,783 |
AG2-212 | 9.0 MW | 1.5% | $10,783 |
AG2-328 | 9.0 MW | 1.5% | $10,783 |
AG2-363 | 10.7 MW | 1.8% | $12,706 |
AG2-364 | 7.1 MW | 1.2% | $8,471 |
AG2-660 | 1.2 MW | 0.2% | $1,417 |
AH1-044 | 7.1 MW | 1.2% | $8,502 |
AH1-150 | 7.1 MW | 1.2% | $8,502 |
AH1-151 | 7.1 MW | 1.2% | $8,502 |
AH1-690 | 441.8 MW | 73.9% | $526,591 |
AH1-711 | 45.9 MW | 7.7% | $54,692 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.i
- Title
- Upgrade the 10A B115 relay and B88 meter thermal at Beaver
- Description
- Upgrade the 10A B115 relay and B88 meter thermal at Beaver
- Total Cost ($USD)
- $509,895
- Allocated Cost ($USD)
- $7,756
- Time Estimate
- 18 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $29,677 |
AG2-165 | 8.3 MW | 2.0% | $10,201 |
AG2-212 | 8.3 MW | 2.0% | $10,201 |
AG2-328 | 8.3 MW | 2.0% | $10,201 |
AG2-660 | 1.0 MW | 0.3% | $1,293 |
AH1-044 | 6.3 MW | 1.5% | $7,756 |
AH1-150 | 6.3 MW | 1.5% | $7,756 |
AH1-151 | 6.3 MW | 1.5% | $7,756 |
AH1-690 | 288.2 MW | 69.8% | $355,957 |
AH1-711 | 55.9 MW | 13.6% | $69,097 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEPI0020K
- Title
- Replace Olive Riser Sub Cond 2874 ACSR (72/7)
- Description
- Total Cost ($USD)
- $150,000
- Allocated Cost ($USD)
- $6,465
- Time Estimate
- 12 to 18 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05COOK-05OLIVE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-163 | 14.2 MW | 9.0% | $13,474 |
AG2-245 | 47.2 MW | 29.8% | $44,767 |
AG2-363 | 15.8 MW | 10.0% | $15,005 |
AG2-364 | 10.6 MW | 6.7% | $10,003 |
AG2-660 | 0.8 MW | 0.5% | $752 |
AH1-044 | 6.8 MW | 4.3% | $6,465 |
AH1-146 | 10.2 MW | 6.4% | $9,646 |
AH1-147 | 10.2 MW | 6.4% | $9,646 |
AH1-150 | 6.8 MW | 4.3% | $6,465 |
AH1-151 | 6.8 MW | 4.3% | $6,465 |
AH1-391 | 14.3 MW | 9.1% | $13,588 |
AH1-482 | 14.5 MW | 9.1% | $13,722 |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18502
- Title
- 05OLIVE 345.0 kV to 05COOK 345.0 kV ckt 1 - Sag Study
- Description
- Perform a sag study and mitigate the sag de-rated 2-954 RAIL ACSR 45/7 (~23.59 miles)
- Total Cost ($USD)
- $117,950
- Allocated Cost ($USD)
- $5,084
- Time Estimate
- 36 to 48 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05COOK-05OLIVE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-163 | 14.2 MW | 9.0% | $10,595 |
AG2-245 | 47.2 MW | 29.8% | $35,202 |
AG2-363 | 15.8 MW | 10.0% | $11,799 |
AG2-364 | 10.6 MW | 6.7% | $7,866 |
AG2-660 | 0.8 MW | 0.5% | $591 |
AH1-044 | 6.8 MW | 4.3% | $5,084 |
AH1-146 | 10.2 MW | 6.4% | $7,585 |
AH1-147 | 10.2 MW | 6.4% | $7,585 |
AH1-150 | 6.8 MW | 4.3% | $5,084 |
AH1-151 | 6.8 MW | 4.3% | $5,084 |
AH1-391 | 14.3 MW | 9.1% | $10,685 |
AH1-482 | 14.5 MW | 9.1% | $10,790 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.j
- Title
- Upgrade (1) 1590 ACSR 45/7 sub conductor at Davis Besse
- Description
- Upgrade (1) 1590 ACSR 45/7 sub conductor at Davis Besse
- Total Cost ($USD)
- $393,871
- Allocated Cost ($USD)
- $4,701
- Time Estimate
- 13 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $12,072 |
AG2-149 | 24.2 MW | 4.0% | $15,919 |
AG2-165 | 9.0 MW | 1.5% | $5,962 |
AG2-212 | 9.0 MW | 1.5% | $5,962 |
AG2-328 | 9.0 MW | 1.5% | $5,962 |
AG2-363 | 10.7 MW | 1.8% | $7,025 |
AG2-364 | 7.1 MW | 1.2% | $4,684 |
AG2-660 | 1.2 MW | 0.2% | $784 |
AH1-044 | 7.1 MW | 1.2% | $4,701 |
AH1-150 | 7.1 MW | 1.2% | $4,701 |
AH1-151 | 7.1 MW | 1.2% | $4,701 |
AH1-690 | 441.8 MW | 73.9% | $291,159 |
AH1-711 | 45.9 MW | 7.7% | $30,240 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.f
- Title
- Upgrade (10) 1590 ACSR sub conductor (B66 and B67 breaker leads, wave trap subconductor, Overheadline-34625) at Davis Besse and B12 breaker leads at Hayes
- Description
- Upgrade (10) 1590 ACSR sub conductor (B66 and B67 breaker leads, wave trap subconductor, Overheadline-34625) at Davis Besse and B12 breaker leads at Hayes
- Total Cost ($USD)
- $305,149
- Allocated Cost ($USD)
- $4,348
- Time Estimate
- 18 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $15,866 |
AG2-165 | 8.1 MW | 1.9% | $5,721 |
AG2-212 | 8.1 MW | 1.9% | $5,721 |
AG2-328 | 8.1 MW | 1.9% | $5,721 |
AG2-660 | 1.0 MW | 0.2% | $725 |
AH1-044 | 6.1 MW | 1.4% | $4,348 |
AH1-150 | 6.1 MW | 1.4% | $4,348 |
AH1-151 | 6.1 MW | 1.4% | $4,348 |
AH1-690 | 306.6 MW | 71.2% | $217,221 |
AH1-711 | 58.0 MW | 13.5% | $41,130 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-006.b
- Title
- Upgrade 3500 SAC 127 OVERHEAD PIPE to disc sw. 34625 at Davis Besse and B18 breaker leads at Hayes
- Description
- Upgrade 3500 SAC 127 OVERHEAD PIPE to disc sw. 34625 at Davis Besse and B18 breaker leads at Hayes
- Total Cost ($USD)
- $284,061
- Allocated Cost ($USD)
- $4,048
- Time Estimate
- 18 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02DAV-BE-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 22.4 MW | 5.2% | $14,770 |
AG2-165 | 8.1 MW | 1.9% | $5,326 |
AG2-212 | 8.1 MW | 1.9% | $5,326 |
AG2-328 | 8.1 MW | 1.9% | $5,326 |
AG2-660 | 1.0 MW | 0.2% | $675 |
AH1-044 | 6.1 MW | 1.4% | $4,048 |
AH1-150 | 6.1 MW | 1.4% | $4,048 |
AH1-151 | 6.1 MW | 1.4% | $4,048 |
AH1-690 | 306.6 MW | 71.2% | $202,209 |
AH1-711 | 58.0 MW | 13.5% | $38,287 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.e
- Title
- Upgrade 345kV 3500 SAC 127 sub conductor at Davis Besse
- Description
- Upgrade 345kV 3500 SAC 127 sub conductor at Davis Besse
- Total Cost ($USD)
- $257,762
- Allocated Cost ($USD)
- $3,076
- Time Estimate
- 13 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $7,900 |
AG2-149 | 24.2 MW | 4.0% | $10,418 |
AG2-165 | 9.0 MW | 1.5% | $3,902 |
AG2-212 | 9.0 MW | 1.5% | $3,902 |
AG2-328 | 9.0 MW | 1.5% | $3,902 |
AG2-363 | 10.7 MW | 1.8% | $4,597 |
AG2-364 | 7.1 MW | 1.2% | $3,065 |
AG2-660 | 1.2 MW | 0.2% | $513 |
AH1-044 | 7.1 MW | 1.2% | $3,076 |
AH1-150 | 7.1 MW | 1.2% | $3,076 |
AH1-151 | 7.1 MW | 1.2% | $3,076 |
AH1-690 | 441.8 MW | 73.9% | $190,544 |
AH1-711 | 45.9 MW | 7.7% | $19,790 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.c
- Title
- Upgrade 345kV 1033.5 AAC 61 sub conductors at Davis Besse substation at Davis Besse
- Description
- Upgrade 345kV 1033.5 AAC 61 sub conductors at Davis Besse substation at Davis Besse
- Total Cost ($USD)
- $257,762
- Allocated Cost ($USD)
- $3,076
- Time Estimate
- 13 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $7,900 |
AG2-149 | 24.2 MW | 4.0% | $10,418 |
AG2-165 | 9.0 MW | 1.5% | $3,902 |
AG2-212 | 9.0 MW | 1.5% | $3,902 |
AG2-328 | 9.0 MW | 1.5% | $3,902 |
AG2-363 | 10.7 MW | 1.8% | $4,597 |
AG2-364 | 7.1 MW | 1.2% | $3,065 |
AG2-660 | 1.2 MW | 0.2% | $513 |
AH1-044 | 7.1 MW | 1.2% | $3,076 |
AH1-150 | 7.1 MW | 1.2% | $3,076 |
AH1-151 | 7.1 MW | 1.2% | $3,076 |
AH1-690 | 441.8 MW | 73.9% | $190,544 |
AH1-711 | 45.9 MW | 7.7% | $19,790 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-002.h
- Title
- Upgrade (8) 1590 AAC 61 sub conductor at BAYSHORE
- Description
- Upgrade (8) 1590 AAC 61 sub conductor at BAYSHORE
- Total Cost ($USD)
- $211,119
- Allocated Cost ($USD)
- $2,520
- Time Estimate
- 13 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BAY SH-02DAV-BE 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-029 | 18.3 MW | 3.1% | $6,471 |
AG2-149 | 24.2 MW | 4.0% | $8,533 |
AG2-165 | 9.0 MW | 1.5% | $3,196 |
AG2-212 | 9.0 MW | 1.5% | $3,196 |
AG2-328 | 9.0 MW | 1.5% | $3,196 |
AG2-363 | 10.7 MW | 1.8% | $3,766 |
AG2-364 | 7.1 MW | 1.2% | $2,510 |
AG2-660 | 1.2 MW | 0.2% | $420 |
AH1-044 | 7.1 MW | 1.2% | $2,520 |
AH1-150 | 7.1 MW | 1.2% | $2,520 |
AH1-151 | 7.1 MW | 1.2% | $2,520 |
AH1-690 | 441.8 MW | 73.9% | $156,064 |
AH1-711 | 45.9 MW | 7.7% | $16,209 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.b
- Title
- Upgrade 3500 SAC (2) B3 and (2) B6 breaker leads at Hayes
- Description
- Upgrade 3500 SAC (2) B3 and (2) B6 breaker leads at Hayes
- Total Cost ($USD)
- $152,573
- Allocated Cost ($USD)
- $2,321
- Time Estimate
- 18 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $8,880 |
AG2-165 | 8.3 MW | 2.0% | $3,052 |
AG2-212 | 8.3 MW | 2.0% | $3,052 |
AG2-328 | 8.3 MW | 2.0% | $3,052 |
AG2-660 | 1.0 MW | 0.3% | $387 |
AH1-044 | 6.3 MW | 1.5% | $2,321 |
AH1-150 | 6.3 MW | 1.5% | $2,321 |
AH1-151 | 6.3 MW | 1.5% | $2,321 |
AH1-690 | 288.2 MW | 69.8% | $106,511 |
AH1-711 | 55.9 MW | 13.6% | $20,676 |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-014.e
- Title
- Upgrade the 1590 AAC (2) B88 and (2) B15 breaker leads at Beaver
- Description
- Upgrade the 1590 AAC (2) B88 and (2) B15 breaker leads at Beaver
- Total Cost ($USD)
- $152,573
- Allocated Cost ($USD)
- $2,321
- Time Estimate
- 18 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02HAYES 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-149 | 24.0 MW | 5.8% | $8,880 |
AG2-165 | 8.3 MW | 2.0% | $3,052 |
AG2-212 | 8.3 MW | 2.0% | $3,052 |
AG2-328 | 8.3 MW | 2.0% | $3,052 |
AG2-660 | 1.0 MW | 0.3% | $387 |
AH1-044 | 6.3 MW | 1.5% | $2,321 |
AH1-150 | 6.3 MW | 1.5% | $2,321 |
AH1-151 | 6.3 MW | 1.5% | $2,321 |
AH1-690 | 288.2 MW | 69.8% | $106,511 |
AH1-711 | 55.9 MW | 13.6% | $20,676 |
System Reinforcement: b4000.1
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- b4000.1
- Title
- Add two 765 kV breakers at Amos Substation to expand the breaker and a half scheme to accommodate the new Amos-Welton Spring 765 kV line (Projected ISD 6/1/2029)
- Description
- 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) |
System Reinforcement: b4000.3
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.3
- Title
- Construct a new 175 miles Amos to Welton Spring 765 kV line - APS/FE Section of the line is 145 miles (Projected ISD 6/1/2029)
- Description
- 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) |
System Reinforcement: b4000.7
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.7
- Title
- Construct a new 86 miles Welton Spring to Rocky Point 765 kV line - in DVP local area/Millville to Lovettsville section, roughly 10.5 miles (Projected ISD 6/1/2029)
- Description
- 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) |
System Reinforcement: b4000.10
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.10
- Title
- Install four 250 MVAR cap banks (two on 765 and two on 500 kV side) and a +/-500 MVAR STATCOM on the 765 kV Rocky Point yard
- Description
- 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) |
System Reinforcement: n9322.0
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- n9322.0 / TE-AG1-S-0012a
- Title
- Replace Four (4) disconnect switches, four (4) breaker leads, and one (1) meter, and reconductor two (2) transmission line drops on the Morocco 345 kV line terminal at Allen Junction.
- Description
- Replace (4) disconnect switches at Allen Junction Replace (4) breaker leads at Allen Junction Reconductor (2) TL Drops at Allen Junction Replace (1) meter at Allen Junction New FE Ratings 1868 / 2249 / 2586 MVA SN/SE/SLD
- Total Cost ($USD)
- $1,408,997
- Allocated Cost ($USD)
- $0
- Time Estimate
- 38 Months
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 is a potential Aggregate Pool Contributor.
| Facility | Contingency | |
|---|---|---|
| 02ALLEN-18MOROCCO 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: b3925.4
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- b3925.4
- Title
- Rebuild the Greenfield - Beaver 138 kV corridor (32 miles) with 795 kcmil 26/7 ACSS
- Description
- Rebuild the Greenfield - Beaver 138 kV corridor (32 miles) with 795 kcmil 26/7 ACSS. This corridor encompasses multiple 138 kV lines that are constructed on common towers.
- Cost Information
- Time Estimate
- Jun 01 2029
Contingent Note: Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| 02BEAVER-02NASA 138.0 kV Ckt 1 line | (Any) | |
| 02BRWELL-02FORD 138.0 kV Ckt 1 line | (Any) | |
| 02BRWELL-02N DEPT 138.0 kV Ckt 1 line | (Any) | |
| 02GRNFLD-02N DEPT 138.0 kV Ckt 1 line | (Any) | |
| 02GRNFLD-02NASA 138.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI.023.c
- Title
- Upgrade the (2) B96 and (2) B7 breaker leads at Lakeview and the (1) B242 to D241 lead at Greenfield
- Description
- Upgrade the (2) B96 and (2) B7 breaker leads at Lakeview and the (1) B242 to D241 lead at Greenfield
- Total Cost ($USD)
- $218,931
- Allocated Cost ($USD)
- $0
- Time Estimate
- 13 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| 02GRNFLD-02LAKVEW 138.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI.023.b
- Title
- Upgrade the B242 relay thermal
- Description
- Upgrade the B242 relay thermal
- Total Cost ($USD)
- $509,895
- Allocated Cost ($USD)
- $0
- Time Estimate
- 18 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| 02GRNFLD-02LAKVEW 138.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- (Pending) / TC2-ATSI-023.a
- Title
- Upgrade (2) line drop strands, one into Greenfield and one into Lakeview
- Description
- Upgrade (2) line drop strands, one into Greenfield and one into Lakeview using single (1) 954 45/7 "Rail" ACSR
- Total Cost ($USD)
- $526,339
- Allocated Cost ($USD)
- $0
- Time Estimate
- 12 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| 02GRNFLD-02LAKVEW 138.0 kV Ckt 1 line | (Any) |
System Reinforcement: b3925.2
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- b3925.2
- Title
- Rebuild the 13.45 miles of Greenfield - Lakeview 138 kV Line from 2 x 336.4 kcmil 26/7 ACSR to 1 x 795 kcmil 26/7 ACSS
- Description
- Rebuild the 13.45 miles of Greenfield - Lakeview 138 kV Line from 2 x 336.4 kcmil 26/7 ACSR to 1 x 795 kcmil 26/7 ACSS
- Cost Information
- Time Estimate
- Jun 01 2029
Contingent Note: Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| 02GRNFLD-02LAKVEW 138.0 kV Ckt 1 line | (Any) |
System Reinforcement: n9228.0
- Type
- Load Flow
- TO
- ATSI
- RTEP ID / TO ID
- n9228.0 / TC1-ATSI-002.b
- Title
- Rebuild 6.6 miles of the Lallendorf-Monroe 345 kV line and install OPGW. Replace line drops and wave traps at Lallendorf.
- Description
- Rebuild approximately 6.6 miles of the Lallendorf-Monroe 345 kV line from Lallendorf to the state line. Transfer and reuse approximately 0.9 miles of existing conductor on the Fostoria Central – Lallendorf 345 kV line to maintain double circuit with Lallendorf – Monroe line. Transfer and reuse approximately 5.7 miles of existing conductor on the Lemoyne – Majestic 345 kV line to maintain double circuit with Lallendorf – Monroe line. At Lallendorf substation, Replace line drops and (2) wave traps on the Monroe terminal.
- Total Cost ($USD)
- $38,362,639
- Allocated Cost ($USD)
- $0
- Time Estimate
- 29 Months
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 is a potential Aggregate Pool Contributor.
| Facility | Contingency | |
|---|---|---|
| 02LALLENDORF-19MON12 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: n9243.0
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- n9243.0 / AEPSERG13
- Title
- Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles.
- Description
- At the Jefferson Station: • Expand the northeast corner of the station • Remove Circuit breaker C1 • Install one (1) new 765/345 kV transformer and associated equipment • Install one (1) new 765 kV circuit breaker with associated control relaying and breaker disconnect switches • Install one (1) new 345 kV circuit breaker with associated control relaying and breaker disconnect switches • Install a new station service center At the Clifty Creek Station: • Extend 345 kV bus 1 and 2 to make room for a new breaker string • Move a section of the 138 kV bus underground to make room for the new breaker string • Relocate circuit breaker S to the new string • Install two (2) new 345 kV circuit breakers on the new string •Remove the existing Jefferson – Clifty Creek 345 kV line •Construct a new Jefferson – Clifty Creek 345 kV double circuit line •Evaluate line settings for all appropriate lines •Install direct fiber relaying between the Jefferson and Clifty Creek station •Associated conductors (buswork, ground grid, jumpers), telecom terminal equipment, insulators, arresters, foundations, and structures
- Total Cost ($USD)
- $200,238,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 55 Months
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 is a potential Aggregate Pool Contributor.
| Facility | Contingency | |
|---|---|---|
| 05JEFRSO-06CLIFTY 345.0 kV Ckt 1 line | (Any) | |
| 05JEFRSO-05JEFRSO 345.0/765.0 kV Ckt 2 transformer | (Any) |
System Reinforcement: b4000.11
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.11
- Title
- Expand Black Oak Substation & Loop in the 502 Jct-Woodside 500 kV line (Projected ISD 6/1/2029)
- Description
- Expand Black Oak Substation to accommodate the connection of the 502 Jct-Woodside 500 kV line and loop the 502 Jct-Woodside 500 kV line into the Black Oak substation by constructing ~0.85 miles of new 500 kV line into and out of Black Oak 500 kV substation
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) | |
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) |
System Reinforcement: s2213.9
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- s2213.9 / (Pending)
- Title
- Six-wire 71.5 miles of the Pierce-Don Marquis line. Construct 0.13 miles of line to tie into Don Marquis station.
- Description
- Six-wire 71.5 miles of the Pierce-Don Marquis line. Construct 0.13 miles of line to tie into Don Marquis station.
- Cost Information
- Time Estimate
- Jun 01 2027
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned supplemental project. AH1-150 is not contingent on this supplemental project as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MARQUI-06PIERCE 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: b3878.1
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- b3878.1
- Title
- Upgrade 765 kV circuit breakers 'B' and 'B2' to 5000A 50kA breakers at Marysville Station
- Description
- Upgrade 765 kV circuit breakers 'B' and 'B2' to 5000A 50kA breakers at Marysville Station. In addition, the project will upgrade the existing wavetrap towards Sorenson.
- Cost Information
- Time Estimate
- Jun 01 2029
Contingent Note: Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| 05MARYSV-05MARYSVL_RS 765.0 kV Ckt Z1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18651
- Title
- 05TWIN B 345.0 kV to 05MERIDN 345.0 kV ckt 1 - Sag Study
- Description
- Perform a sag study and mitigate the sag de-rated 1275 ACSR/PE 54/19 conductor sections (~12.2 miles).
- Total Cost ($USD)
- $61,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 36 to 48 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| 05MERIDN-05TWIN B 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.6
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.6
- Title
- Construct a new 86 miles Welton Spring to Rocky Point 765 kV line (Welton Spring to DVP local area, roughly 21 miles) (VA Portion)
- Description
- 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) |
System Reinforcement: b4000.5
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.5
- Title
- Install four 250 MVAR shunt capacitors, and a +/-500 MVAR STATCOM at Welton Spring 765 kV substation
- Description
- 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) |
System Reinforcement: b4000.9
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.9
- Title
- Construct a new substation called Rocky Point with a 765 kV and a 500 kV yard (Projected ISD 6/1/2029)
- Description
- Construct a new substation called Rocky Point with a 765 kV and a 500 kV yard. Loop in the Doubs-Goose Creek 500 kV line, the Doubs-Aspen 500 kV line, and the Woodside-Goose Creek 500 kV line. Install two 765/500 kV transformer at Rocky Point substation. 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) |
System Reinforcement: b4000.2
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.2
- Title
- Construct a new 175 miles Amos to Welton Spring 765 kV line - AEP Section of the line is 30 miles (Projected ISD 6/1/2029)
- Description
- 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) |
System Reinforcement: b4000.4
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.4
- Title
- Construct a new 765 kV switchyard - Welton Spring (Projected ISD 6/1/2029)
- Description
- 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) |
System Reinforcement: b4000.8
- Type
- Load Flow
- TO
- APS
- RTEP ID / TO ID
- b4000.8
- Title
- Construct a new 86 miles Welton Spring to Rocky Point 765 kV line (DVP local area to Rocky Point, roughly 4.8 miles)
- Description
- 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05MOUNTN-05BELMON 765.0 kV Ckt 1 line | (Any) | |
| 05CLOVRD-05CLOV17_XFL 345.0 kV Ckt 17 line | (Any) | |
| 05KAMMER-05KAMMER_RG 765.0 kV Ckt Z1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18516
- Title
- 17P9700-EAST 345.0 kV to 05OLIVE 345.0 kV ckt 1 - AEP End Ratings
- Description
- AEP end rating is 1413 MVA Rate B.
- Total Cost ($USD)
- $0
- Allocated Cost ($USD)
- $0
- Time Estimate
- 36 to 48 Months
Contributor
| Facility | Contingency | |
|---|---|---|
| 05OLIVE-17P9700-EAST 345.0 kV Ckt 1 line | (Any) |
| Project | MW Impact | Percent Allocation | Allocated Cost ($USD) |
|---|---|---|---|
AG2-363 | 23.0 MW | 8.8% | $0 |
AG2-364 | 15.4 MW | 5.9% | $0 |
AG2-453 | 24.6 MW | 9.4% | $0 |
AG2-524 | 11.1 MW | 4.2% | $0 |
AG2-575 | 10.1 MW | 3.9% | $0 |
AG2-585 | 11.3 MW | 4.3% | $0 |
AG2-660 | 1.8 MW | 0.7% | $0 |
AH1-044 | 15.9 MW | 6.1% | $0 |
AH1-146 | 16.1 MW | 6.1% | $0 |
AH1-147 | 16.1 MW | 6.1% | $0 |
AH1-150 | 15.9 MW | 6.1% | $0 |
AH1-151 | 15.9 MW | 6.1% | $0 |
AH1-196 | 12.1 MW | 4.6% | $0 |
AH1-234 | 17.5 MW | 6.7% | $0 |
AH1-338 | 14.4 MW | 5.5% | $0 |
AH1-341 | 11.5 MW | 4.4% | $0 |
AH1-543 | 12.5 MW | 4.8% | $0 |
AH1-714 | 17.0 MW | 6.5% | $0 |
System Reinforcement: b3851.1
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- b3851.1 / B3851.1
- Title
- Rebuild Allen-RP Mone 345kV
- Description
- Rebuild Allen –R.P. Mone 345kV line (18.6 miles).
- Cost Information
- Time Estimate
- Jun 01 2027
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05RPMONE-05ALLEN 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: b3788.1
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- b3788.1 / B3788.1
- Title
- Replace limiting station elements at Kyger Creek
- Description
- Upgrade existing 345 kV terminal equipment at Kyger Creek on the Kyger Creek-Sporn 345 kV line. Projected in-service date 6/1/2028 Replace AEP-owned station takeoff riser and breaker BB risers at OVEC-owned Kyger Creek station.
- Cost Information
- Time Estimate
- Nov 18 2027
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05SPORN-06KYGER 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: b3788.2
- Type
- Load Flow
- TO
- OVEC
- RTEP ID / TO ID
- b3788.2 / B3788.2
- Title
- Replace limiting station elements at Kyger Creek
- Description
- Upgrade existing 345 kV terminal equipment at Kyger Creek on the Kyger Creek-Sporn 345 kV line. Projected in-service date 6/1/2028 Replace OVEC-owned breaker AA risers, bus work, and breaker AA disconnect switches at OVEC-owned Kyger Creek station.
- Cost Information
- Time Estimate
- Jun 01 2028
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05SPORN-06KYGER 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: n7925.1
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- n7925.1 / AEPI0010a
- Title
- Reconductor ~0.41 miles of the Sullivan – West Casey (Ameren) line
- Description
- •Remove ~0.41 miles of 1024.5 ACAR 30/7 conductor on the Sullivan – West Casey (Ameren) 345 kV line. •Rebuild line with ACSS Cardinal 974 KCM (54/7) •Evaluate line settings
- Total Cost ($USD)
- $1,216,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 11 Months
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 is a potential Aggregate Pool Contributor.
| Facility | Contingency | |
|---|---|---|
| 05SULLIVAN-7SNYDER 345.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18821
- Title
- AEP Reinforcements for DEOK New Sub and New 345kV Line from Tanner's Creek
- Description
- AEP Scope of Work: At Tanners Creek station- install a 345 kV circuit breaker "T", relocate Lawrenceburg #1 345 kV line (between breakers T and T2), relocate Miami Fort 345 kV line (between breakers T and T1), relocate formerly East Bend 345 kV line (to Idlewild Duke station) (between breakers S and S1), and install new Tanners Creek - Idlewild 345 kV line #2 (between breakers R and R1), ~0.35 miles of AEP install and ~2.48 miles of Duke install.
- Total Cost ($USD)
- $6,700,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 72 to 84 Months
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 is a potential Aggregate Pool Contributor.
| Facility | Contingency | |
|---|---|---|
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- DEOK
- RTEP ID / TO ID
- (Pending) / F4504
- Title
- DEOK New Sub and New 345kV Line from Tanner's Creek
- Description
- This Network Upgrade will be joint effort between DEOK & AEP to mitigate the Miami Fort - Tanner's Creek 345kV violations. DEOK Scope of Work: - DEOK will construct a new 5-breaker Ring Bus, 345kV Switching Station in Northern Kentucky called 'Idlewild'(Lat: 39° 5'15.11"N, Long: 84°49'10.14"W) - DEOK will loop the Tanner's Creek (AEP) - East Bend (DEOK) and Miami Fort (DEOK) - Terminal (DEOK) 345kV circuits into Idlewild Substation - In order to loop the Miami Fort - Terminal circuit into Idlewild Substation, DEOK will retire ~0.68 miles of the Miami Fort - Terminal circuit and add ~0.95 miles of new 345kV conductor (954ACSR 45x7, 2cond/ph, 100C). The new conductor will be built on existing DEOK easement. - DEOK will construct a new 345kV circuit from Idlewild substation to a pole that is just outside AEP's Tanner's Creek Substation. This circuit will be ~2.48 miles long with (1) Ohio River Crossing. The new 345kV circuit will be built will 954ACSS/TW, 2-conductor/phase, 200C conductor. Part of the new 345kV circuit will be built on existing DEOK easement, but DEOK will need to obtain ~1.0 mile of new easement. Line ownership for this new circuit will change at the tower which is just outside AEP's Tanner's Creek Substation in Lawrenceburg, Indiana.
- Total Cost ($USD)
- $72,000,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 72 to 84 Months
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 is a potential Aggregate Pool Contributor.
| Facility | Contingency | |
|---|---|---|
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | AEP_P1-2_#7441_100545_SRT-A | |
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | AEP_P4_#7445_05MARYSV 765_B_SRT-A | |
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | AEP_P4_#7441_05SORENS 765_J1_SRT-A | |
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | AEP_P2-2_#9456_06DEARB1 345_1_SRT-A | |
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | AEP_P7-1_#485___SRT-A | |
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | AEP_P4_#7446_05MARYSV 765_B2_SRT-A | |
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | DEOK_P_4519BUFFCLIFTYPIERCEDEAR1OVEC_SRT-A | |
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | AEP_P4_#9456_06DEARB1 345_DC_SRT-A | |
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | DEOK_P4_1579_EASTBEND_SRT-A | |
| 05TANNER-08M.FORT 345.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / AEP-TC2-18731
- Title
- 05WOLFCK 138kV to 05W.WATERT 138kV ckt 1 - Replace Equipment
- Description
- At Wolf Creek Station replace 795 KCM AAC, 37-Str.
- Total Cost ($USD)
- $100,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 24 to 36 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| 05WOLFCK-05W.WATERT 138.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending)
- Title
- AEP end ratings are 1413 MVA
- Description
- AEP end ratings are 1413 MVA
- Total Cost ($USD)
- $0
- Allocated Cost ($USD)
- $0
- Time Estimate
- TBD
Note: This reinforcement is fictitious and will not be cost allocated to projects. It is listed for information purposes only.
| Facility | Contingency | |
|---|---|---|
| 17STJOHN-AF2-359 TP 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.355
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.355
- Title
- Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
- Description
- Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.350
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.350
- Title
- Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.
- Description
- Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.
- Cost Information
- Time Estimate
- Sep 16 2030
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.342
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.342
- Title
- Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
- Description
- Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
- Cost Information
- Time Estimate
- Jul 13 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.326
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.326
- Title
- At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
- Description
- At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
- Cost Information
- Time Estimate
- Feb 24 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.345
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.345
- Title
- Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
- Description
- Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
- Cost Information
- Time Estimate
- Sep 16 2030
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.351
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.351
- Title
- Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.
- Description
- Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.
- Cost Information
- Time Estimate
- Sep 16 2030
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.344
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.344
- Title
- Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.
- Description
- Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.
- Cost Information
- Time Estimate
- Sep 16 2030
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.325
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.325
- Title
- Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
- Description
- Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
- Cost Information
- Time Estimate
- Feb 24 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.352
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.352
- Title
- Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.
- Description
- Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.
- Cost Information
- Time Estimate
- Sep 16 2030
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.346
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.346
- Title
- Cut-in 500kV line from Kraken substation into Yeat substation
- Description
- Cut-in 500kV line from Kraken substation into Yeat substation
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.356
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.356
- Title
- Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
- Description
- Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.348
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.348
- Title
- Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.
- Description
- Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. A new redundant breaker ring will be added at Kraken to accommodate the new 500kV line from North Anna to Kraken.
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.341
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.341
- Title
- Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.
- Description
- Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV substation and extend approximately 0.2 miles of conductor to fly-over the site.
- Cost Information
- Time Estimate
- Jul 13 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.327
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.327
- Title
- Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.
- Description
- Upgrade/install equipment at Ladysmith substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230kV strings of breaker and a half scheme.
- Cost Information
- Time Estimate
- Feb 24 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.357
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.357
- Title
- Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
- Description
- Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
- Cost Information
- Time Estimate
- Jun 01 2029
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement: b4000.349
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- b4000.349
- Title
- Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.
- Description
- Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.
- Cost Information
- Time Estimate
- Sep 16 2030
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-150 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| 05CLOVRD-8LEXNGTN 500.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- Dominion
- RTEP ID / TO ID
- (Pending) / TC2-PH1-DOM-2043
- Title
- Wreck and rebuild 0.93 miles of 230 kV Line 2241 between Hendrick and Persons with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. Dominion portion of line only.
- Description
- Wreck and rebuild 0.93 miles of 230 kV Line 2241 between Hendrick and Persons with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. Dominion portion of line only.
- Total Cost ($USD)
- $3,534,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 36 to 42 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| 6PERSON230 T-AC2-100 TAP 230.0 kV Ckt 1 line | (Any) |
System Reinforcement: n3515.1
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- n3515.1 / ce-017
- Title
- Cherry Valley - Garden Prarie 345 kV: Line rebuild, station bus work, & Cherry Valley 345kV breaker replacement
- Description
- • Rebuild entire 345kV transmission line L.15616 from TSS 156 Cherry Valley to TSS 971 Prairie (approximately 15.4 miles). • Replace static wire with dual OPGW that each contain single-mode 48 count fiber. Install two (2) 48-ct FDPs at TSS 156 Cherry Valley and TSS 971 Prairie to account for new OPGW. • Upgrade the existing substation TSS 156 Cherry Valley by upgrading existing 345kV BT 4-7 circuit breaker and associated disconnect switches. • Upgrade SCADA, relay & protection at 345kV substation TSS 156 Cherry Valley to support upgrade of 345kV L.15616.
- Total Cost ($USD)
- $84,712,245
- Allocated Cost ($USD)
- $0
- Time Estimate
- 50 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: n6639.2
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- n6639.2 / CE_NUN_L15502_4
- Title
- Reconductor the Electric Junction 345 kV line 93407, perform sag mitigation on 345 kV line 93407, upgrade one 345 kV circuit breaker and associated motor operated disconnect switches.
- Description
- • Reconductor 27.2 Miles of 345kV transmission line 93407 from structure 339 to structure 454 • Perform sag mitigation on 13.5 miles of 345kV transmission line 93407 from structure 454 to TSS 111 Electric Junction • Upgrade the existing substation TSS 111 Electric Junction by replacing L.93407 CB motor-operated disconnect switches on both sides of the breaker.
- Total Cost ($USD)
- $146,197,759
- Allocated Cost ($USD)
- $0
- Time Estimate
- 42 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| ELECT JCT;1B-AF2-041 TP 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: n7023.1
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- n7023.1 / CE_NUN_L11124.1
- Title
- Reconductor the Electric Junction - Lombard line L11124 345 kV Line and perform associated station relay and protection upgrades.
- Description
- • Upgrade 13.5 Miles of 345kV transmission line 11124 from TSS 111 Electric Junction to TSS 120 Lombard • Upgrade relay & protection at 345kV substation TSS 111 Electric Junction & TSS 120 Lombard to support upgrade of 345kV transmission line, L1124
- Total Cost ($USD)
- $38,797,273
- Allocated Cost ($USD)
- $0
- Time Estimate
- 36 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| ELECT JCT;1B-LOMBARD ;4B 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: n5318.1
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- n5318.1 / ce-012a
- Title
- Garden Prarie - Silver Lake R 345 kV: Line rebuild, station bus work & Silver Lake 345kV Breaker Replacement
- Description
- • Rebuild entire 345kV transmission line L.97104 from TSS 971 Prairie to TSS 138 Silver Lake (approximately 24.7 miles). • Replace static wire with OPGW that contains single-mode 48 count fiber. Install 48-ct FDP at TSS 138 Silver Lake and TSS 971 Prairie to account for new OPGW. • Upgrade the existing substation TSS138 Silver Lake by replacing existing circuit breaker 345kV BT 3-4 & associated disconnect switches and replacing the line disconnect switch for 345kV line 97104. • Upgrade relay & protection at 345kV substation TSS 138 Silver Lake to support upgrade of 345kV transmission line, 97104.
- Total Cost ($USD)
- $163,968,683
- Allocated Cost ($USD)
- $0
- Time Estimate
- 60 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| SILVER LK; R-AF2-349 TP 345.0 kV Ckt 1 line | (Any) |
System Reinforcement: n6779
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- n6779 / CE_NUN_L14609
- Title
- Plano 138 KV re-conductor a portion of the line
- Description
- The upgrade will be to re-conductor a portion of the line. Potential transmission tower replacement required with line reconductor. The estimate for this work will not be known until the Phase 3 system upgrade Facility Study is completed per the PJM process.Based on the conductor upgrade the scope of work might include multiple tower upgrades. This cost is not included in the preliminary estimate. A more thorough engineering study will be performed during the Facility Study Phase. It is at this time any tower upgrades/replacements will be determined.
- Total Cost ($USD)
- $5,600,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 30 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| PLANO; R-W PLANO ; R 138.0 kV Ckt 1 line | (Any) | |
| W PLANO ; R-AE2-341 TP 138.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- (Pending) / CE_NUN_L14609_1
- Title
- L14609 Line Reconductor and Station Conductor Upgrade
- Description
- STATION CONDUCTOR UPGRADE. LINE RECONDUCTOR WORK WHICH MIGHT REQUIRE TRANSMISSION TOWER REPLACEMENT. THIS COST AND TIMLINE IS NOT INCLUDED IN THIS ESTIMTAE. TEH FACILITY STUDY DURING PHASE 3 WILL IDENTIFY DETAILS.
- Total Cost ($USD)
- $2,500,000
- Allocated Cost ($USD)
- $0
- Time Estimate
- 24 to 30 Months
Contingent Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| W PLANO ; R-AE2-341 TP 138.0 kV Ckt 1 line | (Any) |
System Reinforcement: n9269.0
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- n9269.0 / CE_NUN_L11212.5
- Title
- Reconductorthe L11212 345 kV line.
- Description
- • Reconductor 18.4 Miles of 345kV transmission line 11212 from TSS 112 Wilton Center to TSS 905 Essex. • Upgrade L11212 motor-operated switch and all cable conductors at line termination structure to 2-1590 kcmil ACSR.
- Total Cost ($USD)
- $37,989,655
- Allocated Cost ($USD)
- $0
- Time Estimate
- 42 Months
Potential Aggregate Contributor Note: Based on PJM cost allocation criteria, AH1-150 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-150 could receive cost allocation. Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 is a potential Aggregate Pool Contributor.
| Facility | Contingency | |
|---|---|---|
| WILTON ; B-AD1-100 TAP1 345.0 kV Ckt 1 line | (Any) |
System Reinforcement
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- (Pending) / (Pending)
- Title
- WILTON ; 765.0 kV to 05DUMONT_RW 765.0 kV ckt 1 - AEP End Ratings
- Description
- Limited by non-AEP equipment, AEP End ratings: 5496.0, 6143.0, 6328.0
- Total Cost ($USD)
- $0
- Allocated Cost ($USD)
- $0
- Time Estimate
- 0 to 12 Months
Note: This reinforcement is fictitious and will not be cost allocated to projects. It is listed for information purposes only.
| Facility | Contingency | |
|---|---|---|
| WILTON ;-05DUMONT_RW 765.0 kV Ckt 1 line | (Any) |
System Reinforcement: n5808
- Type
- Load Flow
- TO
- AEP
- RTEP ID / TO ID
- n5808 / N5808
- Title
- CON Upgrade_AEP: eliminate the Eugene stuck breaker contingency. (AMIL upgrade will not be required)
- Description
- • AEP will install two (2) new 345 kV circuit breakers into the "A1" and "B1" breaker positions at the Eugene 345 kV Station. • AEP will relocate the Bunsonville 345 kV line connection from bus #2 to bus #1. The metering associated with this line connection will also be replaced and relocated accordingly.
- Total Cost ($USD)
- $3,424,014
- Allocated Cost ($USD)
- $0
- Time Estimate
- May 15 2026
Not Contingent Note: AH1-150 contributes to the loading of an overloaded facility that is being mitigated by a network upgrade that was securitized by a prior Queue/Cycle. AH1-150 is not contingent on this network upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.
| Facility | Contingency | |
|---|---|---|
| (Any) | AEP_P4_#3128_05EUGENE 345_A2_SRT-A |
System Reinforcement: s3011
- Type
- Load Flow
- TO
- ComEd
- RTEP ID / TO ID
- s3011 / CE_S3011
- Title
- Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration.
- Description
- Replace 345 kV open air straight bus with GIS in a breaker and half configuration (34 Circuit Breakers) at Goodings Grove with 80kA capability.
- Cost Information
- Time Estimate
- Dec 31 2028
Contingent Note: Although AH1-150 may not presently have cost responsibility for this upgrade, AH1-150 may need this upgrade in-service to be deliverable to the PJM system. If AH1-150 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.
| Facility | Contingency | |
|---|---|---|
| (Any) | COMED_P4-6_116-345-R______SRT-A | |
| (Any) | COMED_P4_116-45-TR82____SRT-A | |
| (Any) | COMED_P4_116-45-L11614__SRT-A | |
| (Any) | COMED_P2-2_116_GG-345R__2_SRT-A | |
| (Any) | COMED_P2-2_116_GG-345B__4_SRT-A |