Transition Cycle #1
v1.00 released 2024-05-16 02:03
New Service Requests
System Impact Study Executive Summary Report
Transition Cycle #1 Phase I
1.0 Introduction
This Phase I System Impact Study executive summary report has been prepared in accordance with the PJM Open Access Transmission Tariff Part VII, Subpart D, sections 307 and 308. This report presents an executive summary of Phase I System Impact Study results for New Service Requests (projects) in Transition Cycle #1.
2.0 Preface
The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.
In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
- PJM studies each New Service Request on a summer peak, winter peak[1] and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
- PJM will only perform load flow analysis during the Phase I System Impact Study.
- In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Requests with Affected System impacts and provides each Affected System Operator with a list of New Service Requests in the Cycle with potential impacts to their respective system.
- PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
- The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
3.0 New Services Request List
PJM received 306 New Service Requests to be studied in Transition Cycle #1, Phase I with a combined Maximum Facility Output (MFO) of 45,469.5 MW and 27,684.3 MW as Capacity Interconnection Rights (CIRs). All these New Service Requests are listed in Table 1 below.
Table 1: List of Projects Studied in Transition Cycle #1 / Phase I | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Project ID | Project Name / POI | State[2] | Status | Transmission Owner[3] | Maxiumum Facility Output (MFO in MW) | MW Energy (MWE) | MW Capacity (MWC) | Project Type | Resource Type | ||
AE1-070 | Elwood 345 kV | Illinois | Active | Commonwealth Edison Company | 1610.0 | 0.0 | 135.0 | Generation Interconnection | Natural Gas | ||
AE1-114 | Maryland-Lancaster 138 kV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 34.0 | Generation Interconnection | Wind | ||
AE1-144 | Goddard-Plumville 138 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 100.0 | 100.0 | 66.8 | Generation Interconnection | Solar | ||
AE1-148 | Kerr Dam-Ridge Rd 115 kV | Virginia | Active | Virginia Electric and Power Company | 90.0 | 90.0 | 54.0 | Generation Interconnection | Solar | ||
AE1-172 | Loretto-Wilton Center | Illinois | Active | Commonwealth Edison Company | 255.0 | 255.0 | 44.88 | Generation Interconnection | Wind | ||
AE2-038 | Goddard-Plumsville 138 kV II | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 180.0 | 80.0 | 53.5 | Generation Interconnection | Solar | ||
AE2-053 | Kerr Dam-Ridge Road 115 kV | Virginia | Active | Virginia Electric and Power Company | 110.0 | 20.0 | 20.0 | Generation Interconnection | Storage | ||
AE2-107 | Haumesser Road 138 kV | Illinois | Active | Commonwealth Edison Company | 90.0 | 90.0 | 54.0 | Generation Interconnection | Solar | ||
AE2-123 | Birdneck-Landstown 230 kV | Virginia | Active | Virginia Electric and Power Company | 800.1 | 800.1 | 163.3 | Generation Interconnection | Offshore Wind | ||
AE2-124 | Landstown 230 kV | Virginia | Active | Virginia Electric and Power Company | 800.1 | 800.1 | 148.5 | Generation Interconnection | Offshore Wind | ||
AE2-130 | Rockport 765 kV | Indiana | Active | American Electric Power | 800.0 | 800.0 | 480.0 | Generation Interconnection | Solar; Storage | ||
AE2-138 | Avon-North Clark 345 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 260.0 | 260.0 | 189.8 | Generation Interconnection | Solar | ||
AE2-147 | Swamp 230 kV | North Carolina | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AE2-156 | Yadkin 115 kV | Virginia | Active | Virginia Electric and Power Company | 100.0 | 100.0 | 100.0 | Generation Interconnection | Storage | ||
AE2-185 | Gladys DP-Stonemill Switching Station 69 kV | Virginia | Active | Virginia Electric and Power Company | 60.0 | 60.0 | 36.0 | Generation Interconnection | Solar | ||
AE2-187 | Shockoe DP-Chatham 69 kV | Virginia | Active | Virginia Electric and Power Company | 60.0 | 60.0 | 36.0 | Generation Interconnection | Solar | ||
AE2-210 | Avon-North Clark 345 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 90.0 | 90.0 | 65.4 | Generation Interconnection | Solar | ||
AE2-223 | McLean 345 kV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 19.5 | Generation Interconnection | Wind | ||
AE2-250 | Purdy Sw.-Reams 115 kV | Virginia | Active | Virginia Electric and Power Company | 82.5 | 82.5 | 54.0 | Generation Interconnection | Solar | ||
AE2-261 | Kincaid-Pana 345 kV | Illinois | Active | Commonwealth Edison Company | 299.0 | 299.0 | 179.4 | Generation Interconnection | Solar | ||
AE2-270 | Hopewell-Surry 230 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 150.0 | Generation Interconnection | Solar; Storage | ||
AE2-275 | JK Smith-Fawkes 138 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 90.0 | 90.0 | 65.4 | Generation Interconnection | Solar | ||
AE2-283 | Gladys-Stone Mill 69 kV | Virginia | Active | Virginia Electric and Power Company | 60.4 | 60.4 | 39.6 | Generation Interconnection | Solar | ||
AE2-291 | Grit DP-Perth 115 kV | Virginia | Active | Virginia Electric and Power Company | 102.0 | 102.0 | 61.2 | Generation Interconnection | Solar | ||
AE2-292 | Grit DP-Perth 115 kV | Virginia | Active | Virginia Electric and Power Company | 127.0 | 127.0 | 76.2 | Generation Interconnection | Solar | ||
AE2-308 | Three Forks-Dale 138 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 150.0 | 150.0 | 110.0 | Generation Interconnection | Solar; Storage | ||
AE2-313 | Carson-Rawlings 500 kV | Virginia | Active | Virginia Electric and Power Company | 314.0 | 314.0 | 188.4 | Generation Interconnection | Solar | ||
AE2-321 | Belvidere-Marengo 138 kV | Illinois | Active | Commonwealth Edison Company | 100.0 | 100.0 | 67.0 | Generation Interconnection | Solar | ||
AE2-325 | Valley 138 kV | Michigan | Active | American Electric Power | 152.2 | 52.2 | 31.32 | Generation Interconnection | Storage | ||
AE2-341 | Sandwich-Plano 138 kV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 100.6 | Generation Interconnection | Solar | ||
AF1-030 | Sandwich-Plano 138 kV | Illinois | Active | Commonwealth Edison Company | 250.0 | 100.0 | 66.9 | Generation Interconnection | Solar | ||
AF1-048 | Belvidere-Marengo | Illinois | Active | Commonwealth Edison Company | 152.2 | 52.2 | 31.32 | Generation Interconnection | Storage | ||
AF1-088 | Sullivan 345 kV | Indiana | Active | American Electric Power | 1000.0 | 1000.0 | 1000.0 | Merchant Transmission | None | ||
AF1-099 | Moshannon-Milesburg 230 kV III | Pennsylvania | Active | Keystone Appalachian Transmission Company | 126.5 | 126.5 | 75.9 | Generation Interconnection | Solar; Storage | ||
AF1-100 | Shawville-Moshannon 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 250.0 | 250.0 | 150.0 | Generation Interconnection | Solar; Storage | ||
AF1-123 | Oceana 230 kV | Virginia | Active | Virginia Electric and Power Company | 880.0 | 880.0 | 267.5 | Generation Interconnection | Offshore Wind | ||
AF1-124 | Oceana 230 kV | Virginia | Active | Virginia Electric and Power Company | 880.0 | 880.0 | 267.5 | Generation Interconnection | Offshore Wind | ||
AF1-125 | Oceana 230 kV | Virginia | Active | Virginia Electric and Power Company | 880.0 | 880.0 | 267.5 | Generation Interconnection | Offshore Wind | ||
AF1-128 | Chesterfield 230 kV | Virginia | Active | Virginia Electric and Power Company | 569.0 | 569.0 | 569.0 | Generation Interconnection | Natural Gas | ||
AF1-142 | Moshannon-Milesburg 230 kV IV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 202.4 | 202.4 | 121.44 | Generation Interconnection | Solar; Storage | ||
AF1-152 | Swamp 230 kV | North Carolina | Active | Virginia Electric and Power Company | 50.0 | 50.0 | 30.0 | Generation Interconnection | Solar | ||
AF1-161 | Valley 138 kV | Michigan | Active | American Electric Power | 50.0 | 50.0 | 25.0 | Generation Interconnection | Storage | ||
AF1-176 | Corey 138 kV | Michigan | Active | American Electric Power | 300.0 | 300.0 | 155.684 | Generation Interconnection | Solar; Storage | ||
AF1-200 | Plano 345 kV | Illinois | Active | Commonwealth Edison Company | 2100.0 | 2100.0 | 2035.0 | Merchant Transmission | None | ||
AF1-201 | Hayes-White Marsh 115 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar; Storage | ||
AF1-204 | Eugene 345 kV | Indiana | Active | American Electric Power | 255.0 | 255.0 | 63.75 | Generation Interconnection | Wind | ||
AF1-221 | College Corner-Drewersburg 138 kV | Indiana | Active | American Electric Power | 180.0 | 180.0 | 138.4 | Generation Interconnection | Solar | ||
AF1-233 | Flemingsburg – Spurlock 138kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 225.0 | 225.0 | 150.6 | Generation Interconnection | Solar; Storage | ||
AF1-238 | Sherman Ave - West Vineland 69 kV | New Jersey | Active | Atlantic City Electric | 77.7 | 77.7 | 31.0 | Generation Interconnection | Storage | ||
AF1-240 | Timblin 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AF1-252 | Kincaid-Pana | Illinois | Active | Commonwealth Edison Company | 262.4 | 62.4 | 62.4 | Generation Interconnection | Storage | ||
AF1-253 | Kincaid-Pana | Illinois | Active | Commonwealth Edison Company | 305.6 | 43.2 | 43.2 | Generation Interconnection | Storage | ||
AF1-256 | Flemingsburg-Spurlock 138 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar | ||
AF1-266 | Clubhouse-Sapony 230 kV | Virginia | Active | Virginia Electric and Power Company | 223.5 | 74.5 | 74.5 | Generation Interconnection | Storage | ||
AF1-276 | Lewis Run-Pierce Brook 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 100.0 | 100.0 | 67.0 | Generation Interconnection | Solar | ||
AF1-277 | Lewis Run-Pierce Brook 2 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 200.0 | 100.0 | 67.0 | Generation Interconnection | Solar | ||
AF1-278 | Lewis Run-Pierce Brook 3 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 280.0 | 80.0 | 53.44 | Generation Interconnection | Solar | ||
AF1-280 | Nelson-Lee County | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 137.0 | Generation Interconnection | Solar | ||
AF1-281 | Nelson-Lee County | Illinois | Active | Commonwealth Edison Company | 220.0 | 20.0 | 3.0 | Generation Interconnection | Storage | ||
AF1-293 | Kidds Store-Fort Union 115 kV | Virginia | Active | Virginia Electric and Power Company | 127.86 | 127.86 | 108.37 | Generation Interconnection | Solar; Storage | ||
AF1-294 | Jetersville-Ponton 115 kV | Virginia | Active | Virginia Electric and Power Company | 41.0 | 41.0 | 24.6 | Generation Interconnection | Solar | ||
AF1-296 | Garden Plain 138 kV | Illinois | Active | Commonwealth Edison Company | 212.1 | 212.1 | 37.3296 | Generation Interconnection | Wind | ||
AF1-301 | Louisa-South Anna 230 kV | Virginia | Active | Virginia Electric and Power Company | 117.0 | 117.0 | 70.0 | Generation Interconnection | Solar | ||
AF1-306 | Squab Hollow 230 kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 197.2 | 197.2 | 49.3 | Generation Interconnection | Storage | ||
AF1-314 | Lena - Lancaster 138 kV | Illinois | Active | Commonwealth Edison Company | 212.0 | 212.0 | 37.2 | Generation Interconnection | Wind | ||
AF1-318 | Crescent Ridge-Corbin | Illinois | Active | Commonwealth Edison Company | 299.97 | 299.97 | 52.7947 | Generation Interconnection | Wind | ||
AF1-323 | Scottsville-Colleen 138 kV | Virginia | Active | American Electric Power | 55.0 | 55.0 | 33.0 | Generation Interconnection | Solar | ||
AF2-008 | Sullivan 345 kV | Indiana | Active | American Electric Power | 2000.0 | 1000.0 | 500.0 | Merchant Transmission | None | ||
AF2-010 | Union City-Titusville 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 77.0 | 77.0 | 46.0 | Generation Interconnection | Solar | ||
AF2-016 | Lewis 138 kV | New Jersey | Active | Atlantic City Electric | 240.0 | 240.0 | 96.0 | Generation Interconnection | Storage | ||
AF2-021 | Cedar 69 kV | New Jersey | Active | Atlantic City Electric | 20.0 | 20.0 | 8.0 | Generation Interconnection | Storage | ||
AF2-025 | Ontario 69 kV | New Jersey | Active | Atlantic City Electric | 20.0 | 20.0 | 8.0 | Generation Interconnection | Storage | ||
AF2-034 | Kendall 345kV | Illinois | Active | Commonwealth Edison Company | 1238.8 | 20.0 | 10.8 | Generation Interconnection | Solar; Storage | ||
AF2-035 | St. Johns 115 kV | Virginia | Active | Virginia Electric and Power Company | 72.0 | 72.0 | 48.0 | Generation Interconnection | Solar | ||
AF2-037 | Louisa-North Anna 230 kV | Virginia | Active | Virginia Electric and Power Company | 94.0 | 94.0 | 56.4 | Generation Interconnection | Solar | ||
AF2-041 | Nelson-Electric Junction 345 kV | Illinois | Active | Commonwealth Edison Company | 300.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AF2-042 | Clover-Rawlings 500 kV | Virginia | Active | Virginia Electric and Power Company | 500.0 | 500.0 | 300.0 | Generation Interconnection | Solar | ||
AF2-046 | Tunis-Mapleton 115 kV | North Carolina | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 99.8 | Generation Interconnection | Solar | ||
AF2-047 | Creswell-Riders Creek 115 kV | North Carolina | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 99.8 | Generation Interconnection | Solar | ||
AF2-050 | Bearrock-Johnstown 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 150.0 | 50.0 | 30.0 | Generation Interconnection | Solar | ||
AF2-056 | Shenandoah Tap 1– Mahanoy Tap 2 69 kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 50.0 | 50.0 | 33.0 | Generation Interconnection | Solar | ||
AF2-063 | Louisa-North Anna 230 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AF2-065 | Surry-Hopewell 230 kV | Virginia | Active | Virginia Electric and Power Company | 300.0 | 150.0 | 76.5 | Generation Interconnection | Solar | ||
AF2-068 | Jay 138 kV | Indiana | Active | American Electric Power | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AF2-069 | Crescent Ridge 138 kV | Illinois | Active | Commonwealth Edison Company | 88.7 | 9.3 | 2.2 | Generation Interconnection | Wind | ||
AF2-070 | Crescent Ridge 138 kV | Illinois | Active | Commonwealth Edison Company | 72.6 | 18.15 | 3.1 | Generation Interconnection | Wind | ||
AF2-080 | Chinquapin-Everetts 230 kV | North Carolina | Active | Virginia Electric and Power Company | 150.0 | 70.0 | 48.5 | Generation Interconnection | Solar | ||
AF2-081 | Moyock 230 kV | North Carolina | Active | Virginia Electric and Power Company | 80.0 | 80.0 | 56.0 | Generation Interconnection | Solar | ||
AF2-095 | Davis Creek 138 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 136.0 | Generation Interconnection | Solar; Storage | ||
AF2-096 | Braidwood-East Frankfort 345 kV | Illinois | Active | Commonwealth Edison Company | 375.0 | 375.0 | 255.0 | Generation Interconnection | Solar; Storage | ||
AF2-111 | North Clark-Spurlock 345 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 250.0 | 250.0 | 150.0 | Generation Interconnection | Solar | ||
AF2-115 | Jetersville-Ponton 115 kV | Virginia | Active | Virginia Electric and Power Company | 66.0 | 25.0 | 15.0 | Generation Interconnection | Solar | ||
AF2-120 | Garner-Northern Neck 115 kV | Virginia | Active | Virginia Electric and Power Company | 62.0 | 62.0 | 37.2 | Generation Interconnection | Solar | ||
AF2-121 | Philipsburg-Shawville 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AF2-126 | Weston 69 kV II | Ohio | Active | American Transmission Systems, Incorporated | 101.0 | 51.0 | 34.0 | Generation Interconnection | Solar | ||
AF2-128 | Crescent Ridge-Corbin 138 kV | Illinois | Active | Commonwealth Edison Company | 79.5 | 79.5 | 13.992 | Generation Interconnection | Wind | ||
AF2-142 | Nevada 345 kV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AF2-143 | Powerton-Nevada 345 kV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AF2-164 | Handsome Lake 345 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar | ||
AF2-171 | Madisonville 115 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AF2-173 | Desoto 345 kV | Indiana | Active | American Electric Power | 200.0 | 200.0 | 84.0 | Generation Interconnection | Solar | ||
AF2-176 | Masury-Maysville 138 kV | Pennsylvania | Active | American Transmission Systems, Incorporated | 60.0 | 60.0 | 36.0 | Generation Interconnection | Solar | ||
AF2-177 | Sorenson-DeSoto #2 345 kV | Indiana | Active | American Electric Power | 200.0 | 200.0 | 26.0 | Generation Interconnection | Wind | ||
AF2-182 | Nelson-Lee County 345 kV II | Illinois | Active | Commonwealth Edison Company | 520.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AF2-183 | Nelson-Lee County 345 kV | Illinois | Active | Commonwealth Edison Company | 600.0 | 80.0 | 32.0 | Generation Interconnection | Storage | ||
AF2-193 | Indian River 230 kV I | Delaware | Active | Delmarva Power and Light Company | 440.0 | 440.0 | 119.0 | Generation Interconnection | Offshore Wind | ||
AF2-194 | Indian River 230 kV II | Delaware | Active | Delmarva Power and Light Company | 880.0 | 440.0 | 119.0 | Generation Interconnection | Offshore Wind | ||
AF2-199 | Nelson-Electric Junction 345 kV | Illinois | Active | Commonwealth Edison Company | 400.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AF2-200 | Nelson-Electric Junction 345 kV | Illinois | Active | Commonwealth Edison Company | 600.0 | 200.0 | 120.0 | Generation Interconnection | Solar | ||
AF2-201 | Lena - Lancaster 138 kV | Illinois | Active | Commonwealth Edison Company | 199.0 | 199.0 | 51.4 | Generation Interconnection | Wind; Solar | ||
AF2-209 | South Hicksville-Sowers 138 kV | Ohio | Active | American Electric Power | 140.0 | 140.0 | 95.4 | Generation Interconnection | Solar; Storage | ||
AF2-222 | Madisonville DP-Twitty's Creek 115 kV | Virginia | Active | Virginia Electric and Power Company | 167.0 | 167.0 | 100.0 | Generation Interconnection | Solar | ||
AF2-225 | McLean 345 kV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 63.0 | Generation Interconnection | Solar | ||
AF2-226 | Katydid Road 345 kV | Illinois | Active | Commonwealth Edison Company | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage | ||
AF2-263 | Shelby 138 kV | Ohio | Active | The Dayton Power and Light Company | 98.0 | 98.0 | 58.8 | Generation Interconnection | Solar | ||
AF2-296 | Madera 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AF2-297 | Sedge Hill 115 kV | Virginia | Active | Virginia Electric and Power Company | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar | ||
AF2-299 | Fields 34.5 kV | Virginia | Active | Virginia Electric and Power Company | 25.0 | 25.0 | 15.0 | Generation Interconnection | Solar | ||
AF2-302 | Scottsville-Colleen 138 kV | Virginia | Active | American Electric Power | 75.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AF2-307 | Hope-Blevins Valley Tap 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 66.0 | 66.0 | 39.6 | Generation Interconnection | Solar | ||
AF2-319 | Katydid Road 345 kV | Illinois | Active | Commonwealth Edison Company | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage | ||
AF2-321 | Stryker-Ridgeville 138 kV | Ohio | Active | American Transmission Systems, Incorporated | 148.0 | 148.0 | 88.8 | Generation Interconnection | Solar | ||
AF2-324 | Edgecombe 230 kV | North Carolina | Active | Virginia Electric and Power Company | 75.0 | 75.0 | 45.0 | Generation Interconnection | Solar | ||
AF2-329 | Sandwich-Plano 138 kV | Illinois | Active | Commonwealth Edison Company | 292.2 | 42.2 | 42.2 | Generation Interconnection | Storage | ||
AF2-335 | Delaware-Royerton 138 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AF2-348 | North Clark-Spurlock 345 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 250.0 | 250.0 | 150.0 | Generation Interconnection | Solar | ||
AF2-349 | SILVER LAKE- CHERRY VALLEY 345 KV | Illinois | Active | Commonwealth Edison Company | 300.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AF2-350 | Kensington 138 kV | Illinois | Active | Commonwealth Edison Company | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AF2-351 | Kensington 138 kV | Illinois | Active | Commonwealth Edison Company | 120.0 | 20.0 | 8.0 | Generation Interconnection | Storage | ||
AF2-355 | West Gerrard-J.K. Smith 345 nkV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 225.0 | 225.0 | 135.0 | Generation Interconnection | Solar | ||
AF2-358 | Airey-Vienna 69 kV | Maryland | Active | Delmarva Power and Light Company | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AF2-370 | Delaware-Royerton 138 kV | Indiana | Active | American Electric Power | 100.0 | 0.0 | 20.0 | Generation Interconnection | Storage | ||
AF2-381 | Bedford North-Central City West 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 60.0 | 60.0 | 40.2 | Generation Interconnection | Solar | ||
AF2-388 | Keystone-Desoto 345 kV | Indiana | Active | American Electric Power | 200.0 | 200.0 | 35.2 | Generation Interconnection | Wind | ||
AF2-392 | Nelson-Dixon 138 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 35.2 | Generation Interconnection | Wind | ||
AF2-393 | Nelson-Dixon 138 kV | Illinois | Active | Commonwealth Edison Company | 260.0 | 60.0 | 55.0 | Generation Interconnection | Storage | ||
AF2-394 | Nelson-Dixon 138 kV | Illinois | Active | Commonwealth Edison Company | 300.0 | 40.0 | 40.0 | Generation Interconnection | Storage | ||
AF2-396 | Stinger 138 kV | Michigan | Active | American Electric Power | 200.0 | 200.0 | 200.0 | Generation Interconnection | Solar; Storage | ||
AF2-397 | Fork Union-Mt. Eagle 230 kV | Virginia | Active | Virginia Electric and Power Company | 130.0 | 130.0 | 78.0 | Generation Interconnection | Solar; Storage | ||
AF2-403 | Shockoe DP-Chatham 69 kV | Virginia | Active | Virginia Electric and Power Company | 60.0 | 0.0 | 8.0 | Generation Interconnection | Storage | ||
AF2-404 | Gladys DP-Stonemill 69 kV | Virginia | Active | Virginia Electric and Power Company | 60.0 | 0.0 | 0.0 | Generation Interconnection | Storage | ||
AF2-406 | Sayre 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 75.0 | 75.0 | 75.0 | Generation Interconnection | Storage | ||
AF2-407 | Fall Creek 345 kV | Indiana | Active | American Electric Power | 300.0 | 300.0 | 300.0 | Generation Interconnection | Storage | ||
AF2-412 | Mainesburg 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 130.0 | 130.0 | 130.0 | Generation Interconnection | Storage | ||
AF2-441 | Burnham 138kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 80.0 | Generation Interconnection | Storage | ||
AG1-005 | Corbin-Crescent Ridge 138 kV | Illinois | Active | Commonwealth Edison Company | 250.0 | 250.0 | 150.0 | Generation Interconnection | Solar | ||
AG1-008 | Tunis-Mapleton 115 kV | North Carolina | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 100.0 | Generation Interconnection | Solar | ||
AG1-011 | Colonial Trail 230 kV | Virginia | Active | Virginia Electric and Power Company | 160.0 | 160.0 | 160.0 | Generation Interconnection | Storage | ||
AG1-019 | Arnold's Corner-Dahlgren 230 kV | Virginia | Active | Virginia Electric and Power Company | 200.0 | 100.0 | 100.0 | Generation Interconnection | Storage | ||
AG1-021 | Jetersville-Ponton 115 kV | Virginia | Active | Virginia Electric and Power Company | 86.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-022 | Scottsville-Colleen 138 kV | Virginia | Active | American Electric Power | 95.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-030 | Victoria DP-Martin DP 115 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AG1-051 | Maysville 69 kV III | Pennsylvania | Active | American Transmission Systems, Incorporated | 70.0 | 20.0 | 20.0 | Generation Interconnection | Storage | ||
AG1-060 | Eldred 69 kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 174.8 | 174.8 | 25.7 | Generation Interconnection | Solar | ||
AG1-061 | Laurel-Sharptown 69 kV | Delaware | Active | Delmarva Power and Light Company | 109.3 | 109.3 | 65.58 | Generation Interconnection | Solar | ||
AG1-075 | Purdy-Sapony 115 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 93.2 | Generation Interconnection | Solar | ||
AG1-082 | Ahoskie 34.5 kV | North Carolina | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar; Storage | ||
AG1-083 | Ahoskie 34.5 kV | North Carolina | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar; Storage | ||
AG1-090 | Philipsburg 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 100.0 | 100.0 | 80.0 | Generation Interconnection | Solar; Storage | ||
AG1-098 | Briery-Clover 230 kV | Virginia | Active | Virginia Electric and Power Company | 107.0 | 107.0 | 64.2 | Generation Interconnection | Solar | ||
AG1-105 | Mount Laurel-Barnes Junction 115 kV | Virginia | Active | Virginia Electric and Power Company | 90.0 | 90.0 | 54.0 | Generation Interconnection | Solar | ||
AG1-106 | Thelma 230 kV | North Carolina | Active | Virginia Electric and Power Company | 350.0 | 50.0 | 34.4 | Generation Interconnection | Solar | ||
AG1-109 | Valley 138 kV | Michigan | Active | American Electric Power | 50.0 | 0.0 | 25.0 | Generation Interconnection | Storage | ||
AG1-118 | Sugar Grove-Waterman 138kV | Illinois | Active | Commonwealth Edison Company | 300.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AG1-119 | Wayne-Byron 345 kV | Illinois | Active | Commonwealth Edison Company | 300.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AG1-120 | Glidden-Cherry Valley 138 kV | Illinois | Active | Commonwealth Edison Company | 118.6 | 118.6 | 71.16 | Generation Interconnection | Solar | ||
AG1-121 | Kewanee-Streator 138 kV | Illinois | Active | Commonwealth Edison Company | 294.7 | 294.7 | 51.9 | Generation Interconnection | Wind | ||
AG1-123 | Amherst 69 kV | Virginia | Active | American Electric Power | 65.0 | 65.0 | 38.5 | Generation Interconnection | Solar | ||
AG1-124 | Gladstone 138 kV | Virginia | Active | American Electric Power | 90.0 | 90.0 | 53.01 | Generation Interconnection | Solar | ||
AG1-127 | Crego Rd 138 kV | Illinois | Active | Commonwealth Edison Company | 190.0 | 95.1 | 57.1 | Generation Interconnection | Solar | ||
AG1-133 | North Anna-Ladysmith 500 kV | Virginia | Active | Virginia Electric and Power Company | 128.0 | 128.0 | 76.8 | Generation Interconnection | Solar | ||
AG1-134 | Kings Dominion DP 115 kV | Virginia | Active | Virginia Electric and Power Company | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AG1-135 | Garner-Lancaster 115 kV | Virginia | Active | Virginia Electric and Power Company | 60.0 | 60.0 | 36.0 | Generation Interconnection | Solar | ||
AG1-146 | Garner DP-Lancaster 115 kV | Virginia | Active | Virginia Electric and Power Company | 30.0 | 30.0 | 18.0 | Generation Interconnection | Solar | ||
AG1-147 | Garner DP-Lancaster 115 kV | Virginia | Active | Virginia Electric and Power Company | 100.0 | 70.0 | 42.0 | Generation Interconnection | Solar | ||
AG1-151 | Endless Caverns 115 kV | Virginia | Active | Virginia Electric and Power Company | 300.0 | 100.0 | 100.0 | Generation Interconnection | Storage | ||
AG1-153 | Heritage 500 kV | Virginia | Active | Virginia Electric and Power Company | 75.0 | 75.0 | 30.0 | Generation Interconnection | Storage | ||
AG1-154 | Ladysmith CT 230 kV | Virginia | Active | Virginia Electric and Power Company | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage | ||
AG1-160 | Rogers Road 500 kV | Virginia | Active | Virginia Electric and Power Company | 75.0 | 75.0 | 30.0 | Generation Interconnection | Storage | ||
AG1-166 | Lone Pine 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-167 | Lone Pine 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-168 | Lone Pine 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-169 | Lone Pine 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-170 | Lone Pine 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-174 | Hopewell-Surry 230 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-178 | Carson-Suffolk 500 kV | Virginia | Active | Virginia Electric and Power Company | 500.0 | 500.0 | 324.94 | Generation Interconnection | Solar | ||
AG1-179 | Brunswick-Gasburg 69 kV | Virginia | Active | Virginia Electric and Power Company | 50.0 | 50.0 | 33.66 | Generation Interconnection | Solar | ||
AG1-180 | Brunswick-Gasburg 69 kV | Virginia | Active | Virginia Electric and Power Company | 50.0 | 0.0 | 16.4 | Generation Interconnection | Storage | ||
AG1-181 | Pamplin-Chase City 115 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 101.09 | Generation Interconnection | Solar | ||
AG1-184 | Carson-Suffolk 500 kV | Virginia | Active | Virginia Electric and Power Company | 500.0 | 0.0 | 175.06 | Generation Interconnection | Storage | ||
AG1-185 | Pamplin-Chase City 115 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 0.0 | 48.91 | Generation Interconnection | Storage | ||
AG1-194 | Nuttall 138 kV | West Virginia | Active | American Electric Power | 200.0 | 200.0 | 104.0 | Generation Interconnection | Solar; Storage | ||
AG1-195 | Valley 230 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 150.0 | Generation Interconnection | Solar; Storage | ||
AG1-196 | Grottoes 115 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 150.0 | Generation Interconnection | Solar; Storage | ||
AG1-199 | Allen Junction 345 kV | Ohio | Active | American Transmission Systems, Incorporated | 300.0 | 300.0 | 300.0 | Generation Interconnection | Storage | ||
AG1-219 | Layland 69 kV | West Virginia | Active | American Electric Power | 75.0 | 75.0 | 39.5 | Generation Interconnection | Solar; Storage | ||
AG1-224 | Pendleton-Tanners Creek 138 kV | Indiana | Active | American Electric Power | 210.0 | 210.0 | 126.0 | Generation Interconnection | Solar | ||
AG1-225 | Adams 138 kV | Indiana | Active | American Electric Power | 346.0 | 346.0 | 207.0 | Generation Interconnection | Solar | ||
AG1-226 | Eugene-Dequine 345 kV | Indiana | Active | American Electric Power | 450.0 | 450.0 | 331.5 | Generation Interconnection | Solar | ||
AG1-236 | Lanesville-Brokaw 345 kV | Illinois | Active | Commonwealth Edison Company | 400.0 | 200.0 | 26.0 | Generation Interconnection | Wind | ||
AG1-257 | Madisonburg Jct-Millheim 46 kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 19.9 | 19.9 | 8.3 | Generation Interconnection | Solar | ||
AG1-272 | Twitty's Creek 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 15.42 | Generation Interconnection | Solar; Storage | ||
AG1-273 | Twitty's Creek 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 15.42 | Generation Interconnection | Solar; Storage | ||
AG1-274 | Twitty's Creek 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 15.42 | Generation Interconnection | Solar; Storage | ||
AG1-277 | Salem-Beacon Power 69 kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 40.0 | 40.0 | 32.0 | Generation Interconnection | Solar; Storage | ||
AG1-278 | Salem-Beacon Power 69 kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 60.0 | 20.0 | 15.42 | Generation Interconnection | Solar; Storage | ||
AG1-279 | Salem-Beacon Power 69 kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 80.0 | 20.0 | 15.42 | Generation Interconnection | Solar; Storage | ||
AG1-284 | Fork Union 115 kV | Virginia | Active | Virginia Electric and Power Company | 70.0 | 70.0 | 42.0 | Generation Interconnection | Solar | ||
AG1-285 | Chase City-Central 115 kV | Virginia | Active | Virginia Electric and Power Company | 125.0 | 125.0 | 75.0 | Generation Interconnection | Solar | ||
AG1-288 | Lake of the Woods DP-Wilderness DP 115 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 96.59 | Generation Interconnection | Solar | ||
AG1-289 | Lake of the Woods DP-Wilderness DP 115 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 0.0 | 53.41 | Generation Interconnection | Storage | ||
AG1-297 | Hanna-Tanners Creek 345 kV | Indiana | Active | American Electric Power | 500.0 | 500.0 | 200.0 | Generation Interconnection | Storage | ||
AG1-298 | Calumet-Burnham 345 kV | Illinois | Active | Commonwealth Edison Company | 500.0 | 500.0 | 500.0 | Generation Interconnection | Storage | ||
AG1-305 | Louisa-North Anna 230 kV | Virginia | Active | Virginia Electric and Power Company | 118.0 | 118.0 | 70.8 | Generation Interconnection | Solar | ||
AG1-306 | Fawkes-Dale 138 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 65.0 | 65.0 | 39.0 | Generation Interconnection | Solar | ||
AG1-308 | Shawville-Philipsburg 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 19.9 | 19.9 | 8.3 | Generation Interconnection | Solar | ||
AG1-319 | Napoleon Muni 138 kV | Ohio | Active | American Municipal Power, Inc. | 206.0 | 166.0 | 99.6 | Generation Interconnection | Solar | ||
AG1-321 | Dresden-Pontiac Midpoint 345 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 126.4 | Generation Interconnection | Solar | ||
AG1-342 | Dryburg 115 kV | Virginia | Active | Virginia Electric and Power Company | 45.0 | 45.0 | 25.2 | Generation Interconnection | Solar; Storage | ||
AG1-343 | Boykins-Murphy 115 kV | Virginia | Active | Virginia Electric and Power Company | 62.5 | 62.5 | 35.0 | Generation Interconnection | Solar; Storage | ||
AG1-346 | Mount Jackson DP 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-353 | Greene County-Marion County 161 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 98.0 | 98.0 | 58.8 | Generation Interconnection | Solar | ||
AG1-354 | Summershade-Green County 161 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AG1-359 | Fentress 230 kV | Virginia | Active | Virginia Electric and Power Company | 127.5 | 127.5 | 127.5 | Generation Interconnection | Storage | ||
AG1-364 | Deep Creek 115 kV | Virginia | Active | Virginia Electric and Power Company | 100.0 | 100.0 | 40.0 | Generation Interconnection | Storage | ||
AG1-367 | DeSoto 345 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AG1-371 | Nelson-Electric Junction 345 kV | Illinois | Active | Commonwealth Edison Company | 600.0 | 0.0 | 30.0 | Generation Interconnection | Storage | ||
AG1-373 | Nelson-Electric Junction 345 kV | Illinois | Active | Commonwealth Edison Company | 600.0 | 0.0 | 10.0 | Generation Interconnection | Storage | ||
AG1-374 | Blue Mound 345 kV | Illinois | Active | Commonwealth Edison Company | 300.0 | 300.0 | 180.0 | Generation Interconnection | Solar; Storage | ||
AG1-375 | Sorenson-Desoto 345 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AG1-377 | Philipsburg 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 120.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-378 | Philipsburg 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 140.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-379 | Minonk 345 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 137.2 | Generation Interconnection | Solar | ||
AG1-384 | Twitty's Creek 115 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 15.42 | Generation Interconnection | Solar; Storage | ||
AG1-389 | Gold 115 kV IV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 120.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-390 | Gold 115 kV III | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 100.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-391 | Gold 115 kV II | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 80.0 | 40.0 | 24.0 | Generation Interconnection | Solar | ||
AG1-392 | Gold 115 kV I | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 40.0 | 40.0 | 24.0 | Generation Interconnection | Solar | ||
AG1-393 | Fort Pickett DP 34.5 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-394 | Boykins 34.5 kV | Virginia | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar | ||
AG1-399 | Blue Mound-Chestnut 345 kV | Illinois | Active | Commonwealth Edison Company | 300.0 | 300.0 | 52.8 | Generation Interconnection | Wind | ||
AG1-400 | Blue Mound-Chestnut 345 kV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 150.0 | Generation Interconnection | Storage | ||
AG1-402 | Blue Mound-Chestnut 345 kV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 150.0 | Generation Interconnection | Storage | ||
AG1-404 | Blue Mound-Chestnut 345 kV | Illinois | Active | Commonwealth Edison Company | 100.0 | 100.0 | 100.0 | Generation Interconnection | Storage | ||
AG1-410 | Maddox Creek-RP Mone 345 kV | Ohio | Active | American Electric Power | 300.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AG1-411 | Maddox Creek-RP Mone 345 kV | Ohio | Active | American Electric Power | 100.0 | 100.0 | 100.0 | Generation Interconnection | Storage | ||
AG1-412 | Ladysmith CT-Mine Road 230 kV | Virginia | Active | Virginia Electric and Power Company | 200.0 | 200.0 | 80.0 | Generation Interconnection | Storage | ||
AG1-421 | Lexington-Dooms 230 kV | Virginia | Active | Virginia Electric and Power Company | 200.0 | 200.0 | 120.0 | Generation Interconnection | Solar | ||
AG1-422 | Lexington-Dooms 230 kV | Virginia | Active | Virginia Electric and Power Company | 50.0 | 50.0 | 50.0 | Generation Interconnection | Storage | ||
AG1-423 | Byron-Wayne 345 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 120.0 | Generation Interconnection | Solar | ||
AG1-424 | Sowers 138 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AG1-425 | Groton 138 kV | Ohio | Active | American Transmission Systems, Incorporated | 125.0 | 0.0 | 20.0 | Generation Interconnection | Storage | ||
AG1-426 | Bremo-Scottsville 138 kV | Virginia | Active | American Electric Power | 149.5 | 0.0 | 17.0 | Generation Interconnection | Storage | ||
AG1-427 | Chase City-Drakes Branch 115 kV | Virginia | Active | Virginia Electric and Power Company | 118.56 | 118.56 | 71.136 | Generation Interconnection | Solar | ||
AG1-428 | Danieltown DP–Brunswick 69 kV | Virginia | Active | Virginia Electric and Power Company | 46.8 | 46.8 | 28.08 | Generation Interconnection | Solar | ||
AG1-432 | Curdsville DP-Willis Mt. 115 kV | Virginia | Active | Virginia Electric and Power Company | 200.0 | 200.0 | 120.0 | Generation Interconnection | Solar | ||
AG1-433 | Keystone - DeSoto 345 kV | Indiana | Active | American Electric Power | 300.0 | 100.0 | 17.6 | Generation Interconnection | Wind | ||
AG1-434 | Electric Junction-Nelson 345 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 35.2 | Generation Interconnection | Wind | ||
AG1-435 | Kewanee-Hennepin 138 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 35.2 | Generation Interconnection | Wind | ||
AG1-436 | Olive-University Park 345 kV | Indiana | Active | American Electric Power | 250.0 | 125.0 | 75.0 | Generation Interconnection | Solar | ||
AG1-437 | Cashie-Earleys 230 kV | North Carolina | Active | Virginia Electric and Power Company | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AG1-438 | Cashie-Earleys 230 kV | North Carolina | Active | Virginia Electric and Power Company | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar | ||
AG1-439 | Chinquapin 230 kV | North Carolina | Active | Virginia Electric and Power Company | 250.0 | 250.0 | 150.0 | Generation Interconnection | Solar | ||
AG1-440 | Palmer Springs 115 kV | Virginia | Active | Virginia Electric and Power Company | 75.0 | 75.0 | 45.0 | Generation Interconnection | Solar | ||
AG1-441 | Palmer Springs 115 kV | Virginia | Active | Virginia Electric and Power Company | 75.0 | 75.0 | 45.0 | Generation Interconnection | Solar | ||
AG1-442 | Cashie-Earleys 230 kV | North Carolina | Active | Virginia Electric and Power Company | 135.0 | 35.0 | 35.0 | Generation Interconnection | Storage | ||
AG1-443 | Cashie-Earleys 230 kV | North Carolina | Active | Virginia Electric and Power Company | 135.0 | 35.0 | 35.0 | Generation Interconnection | Storage | ||
AG1-444 | Chinquapin 230 kV | North Carolina | Active | Virginia Electric and Power Company | 330.0 | 80.0 | 80.0 | Generation Interconnection | Storage | ||
AG1-445 | Palmer Springs 115 kV | Virginia | Active | Virginia Electric and Power Company | 101.0 | 26.0 | 26.0 | Generation Interconnection | Storage | ||
AG1-446 | Palmer Springs 115 kV | Virginia | Active | Virginia Electric and Power Company | 101.0 | 26.0 | 26.0 | Generation Interconnection | Storage | ||
AG1-447 | Olive-University Park 345 kV | Indiana | Active | American Electric Power | 305.0 | 55.0 | 55.0 | Generation Interconnection | Storage | ||
AG1-449 | Rawlings-Carson 500 kV | Virginia | Active | Virginia Electric and Power Company | 436.0 | 122.0 | 122.0 | Generation Interconnection | Storage | ||
AG1-450 | Airey-Vienna 69 kV II | Maryland | Active | Delmarva Power and Light Company | 125.0 | 25.0 | 25.0 | Generation Interconnection | Storage | ||
AG1-451 | Curdsville DP-Willis Mt. 115 kV | Virginia | Active | Virginia Electric and Power Company | 120.0 | 20.0 | 20.0 | Generation Interconnection | Storage | ||
AG1-453 | Guardian 138 kV | Indiana | Active | American Electric Power | 140.0 | 140.0 | 84.0 | Generation Interconnection | Solar | ||
AG1-454 | Guardian 138 kV | Indiana | Active | American Electric Power | 190.0 | 50.0 | 50.0 | Generation Interconnection | Storage | ||
AG1-456 | Wildcat 138 kV | Ohio | Active | American Electric Power | 180.0 | 30.0 | 30.0 | Generation Interconnection | Storage | ||
AG1-460 | Kincaid-Pana 345 kV | Illinois | Active | Commonwealth Edison Company | 329.0 | 30.0 | 12.0 | Generation Interconnection | Storage | ||
AG1-462 | Cordova 345 kV | Illinois | Active | Commonwealth Edison Company | 255.0 | 255.0 | 153.0 | Generation Interconnection | Solar | ||
AG1-471 | Up Church-Wayne County 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 60.0 | 60.0 | 36.0 | Generation Interconnection | Solar | ||
AG1-473 | Shingletown-Lewistown 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 53.9 | 53.9 | 32.34 | Generation Interconnection | Solar; Storage | ||
AG1-483 | Dickerson 230 kV | Maryland | Active | Potomac Electric Power Company | 542.5 | 542.5 | 542.5 | Generation Interconnection | Solar; Storage | ||
AG1-488 | Marion Co 161 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 70.0 | 70.0 | 42.0 | Generation Interconnection | Solar | ||
AG1-494 | Boxwood-Riverville 138 kV | Virginia | Active | American Electric Power | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage | ||
AG1-497 | Cartanza 230 kV | Delaware | Active | Delmarva Power and Light Company | 120.0 | 120.0 | 84.0 | Generation Interconnection | Solar; Storage | ||
AG1-505 | Rawlings-Clover 500 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AG1-506 | Rawlings-Clover 500 kV | Virginia | Active | Virginia Electric and Power Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar | ||
AG1-522 | Sullivan-Rockport 765 kV | Indiana | Active | American Electric Power | 300.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AG1-523 | Sullivan-Rockport 765 kV | Indiana | Active | American Electric Power | 600.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AG1-524 | Sullivan-Rockport 765 kV | Indiana | Active | American Electric Power | 900.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AG1-525 | Sullivan-Rockport 765 kV | Indiana | Active | American Electric Power | 1200.0 | 300.0 | 180.0 | Generation Interconnection | Solar | ||
AG1-526 | West Garrard 345 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 222.0 | 222.0 | 133.2 | Generation Interconnection | Solar | ||
AG1-529 | Farmview 138 kV | Delaware | Active | Delmarva Power and Light Company | 75.0 | 75.0 | 48.9 | Generation Interconnection | Solar | ||
AG1-531 | Poolesville-Winchester 230 kV | Virginia | Active | Virginia Electric and Power Company | 54.0 | 54.0 | 32.4 | Generation Interconnection | Solar | ||
AG1-535 | State Line-S. Chicago Properties 138 kV | Illinois | Active | Commonwealth Edison Company | 85.0 | 85.0 | 85.0 | Generation Interconnection | Storage | ||
AG1-536 | Garner-Northern Neck 115 kV | Virginia | Active | Virginia Electric and Power Company | 75.0 | 75.0 | 32.0 | Generation Interconnection | Storage | ||
AG1-537 | Barterbrook-Stuarts Draft 115 kV | Virginia | Active | Virginia Electric and Power Company | 75.0 | 75.0 | 32.0 | Generation Interconnection | Storage | ||
AG1-538 | Remington-Gordonsville 230 kV | Virginia | Active | Virginia Electric and Power Company | 75.0 | 75.0 | 32.0 | Generation Interconnection | Storage | ||
AG1-539 | Grit DP-Perth 115 kV | Virginia | Active | Virginia Electric and Power Company | 75.0 | 75.0 | 32.0 | Generation Interconnection | Storage | ||
AG1-547 | Mount Airy-Chatham 69 kV | Virginia | Active | Virginia Electric and Power Company | 50.0 | 50.0 | 32.54 | Generation Interconnection | Solar; Storage | ||
AG1-548 | Erie South-Union City 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 150.0 | 150.0 | 115.0 | Generation Interconnection | Solar; Storage | ||
AG1-549 | Keystone 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 100.0 | 100.0 | 85.0 | Generation Interconnection | Solar; Storage | ||
AG1-551 | Parmele 12.5 kV | North Carolina | Active | Virginia Electric and Power Company | 20.0 | 20.0 | 13.1 | Generation Interconnection | Solar | ||
AG1-552 | Carolina 13.2 kV | North Carolina | Active | Virginia Electric and Power Company | 18.0 | 18.0 | 12.2 | Generation Interconnection | Solar | ||
AG1-553 | Cordova 345 kV | Illinois | Active | Commonwealth Edison Company | 284.0 | 284.0 | 236.4 | Generation Interconnection | Solar; Storage | ||
AG1-556 | Lexington 115 kV | Virginia | Active | Virginia Electric and Power Company | 100.0 | 100.0 | 100.0 | Generation Interconnection | Storage |
4.0 Total Network Upgrade Cost Summary for All Projects
Table 2 shows a summary of the total planning level cost estimates for each individual New Service Request received by PJM and studied in Transition Cycle #1 Phase I. These network upgrade costs are subject to change as a result of a facility study performed by the Interconnected Transmission Owner during the Phase II or Phase III System Impact Study.
Table 2: Network Cost Summary for all projects of Transition Cycle #1 Phase I | ||||||
---|---|---|---|---|---|---|
Project ID | Transmission Owner Interconnection Facilities (TOIF) | Physical Interconnection Network Upgrades | System Reliability Network Upgrades | Affected System Study Reinforcements | Total Cost | |
AE1-070 | $4,414,472 | $0 | $1,221,597 | $0 | $5,636,069 | |
AE1-114 | $892,199 | $45,075,784 | $17,552,573 | $0 | $63,520,556 | |
AE1-144 | $705,000 | $5,880,000 | $7,453,956 | $0 | $14,038,956 | |
AE1-148 | $350,000 | $5,000,000 | $10,841,991 | $0 | $16,191,991 | |
AE1-172 | $1,000,000 | $48,975,335 | $39,257,365 | $0 | $89,232,700 | |
AE2-038 | $705,000 | $5,880,000 | $5,964,202 | $0 | $12,549,202 | |
AE2-053 | $350,000 | $5,000,000 | $514,940 | $0 | $5,864,940 | |
AE2-107 | $1,000,000 | $6,000,000 | $3,386,367 | $0 | $10,386,367 | |
AE2-123 | $1,600,000 | $4,500,000 | $257,723,140 | $0 | $263,823,140 | |
AE2-124 | $800,000 | $3,000,000 | $216,765,086 | $0 | $220,565,086 | |
AE2-130 | $3,210,000 | $4,620,000 | $46,273,216 | $0 | $54,103,216 | |
AE2-138 | $1,010,000 | $6,900,000 | $9,648,915 | $0 | $17,558,915 | |
AE2-147 | $0 | $0 | $20,801,352 | $0 | $20,801,352 | |
AE2-156 | $700,000 | $3,800,000 | $2,987,420 | $0 | $7,487,420 | |
AE2-185 | $350,000 | $2,000,000 | $28,671,510 | $0 | $31,021,510 | |
AE2-187 | $350,000 | $2,000,000 | $7,388,943 | $0 | $9,738,943 | |
AE2-210 | $1,010,000 | $6,900,000 | $2,502,282 | $0 | $10,412,282 | |
AE2-223 | $200,087 | $0 | $27,770,026 | $0 | $27,970,113 | |
AE2-250 | $700,000 | $10,000,000 | $8,539,885 | $0 | $19,239,885 | |
AE2-261 | $550,000 | $12,000,000 | $16,841,989 | $0 | $29,391,989 | |
AE2-270 | $400,000 | $5,350,000 | $68,062,820 | $0 | $73,812,820 | |
AE2-275 | $1,755,000 | $8,895,000 | $1,735,286 | $0 | $12,385,286 | |
AE2-283 | $700,000 | $4,000,000 | $31,271,107 | $0 | $35,971,107 | |
AE2-291 | $2,100,000 | $5,500,000 | $17,630,806 | $0 | $25,230,806 | |
AE2-292 | $2,100,000 | $5,500,000 | $21,952,103 | $0 | $29,552,103 | |
AE2-308 | $1,490,000 | $10,175,000 | $2,923,232 | $0 | $14,588,232 | |
AE2-313 | $400,000 | $12,500,000 | $129,719,022 | $0 | $142,619,022 | |
AE2-321 | $500,000 | $9,625,000 | $1,014,101 | $0 | $11,139,101 | |
AE2-325 | $249,000 | $70,000 | $0 | $0 | $319,000 | |
AE2-341 | $198,469 | $11,495,441 | $4,768,803 | $0 | $16,462,713 | |
AF1-030 | $198,469 | $11,495,441 | $1,470,166 | $0 | $13,164,076 | |
AF1-048 | $500,000 | $9,625,000 | $0 | $0 | $10,125,000 | |
AF1-088 | $2,340,000 | $3,170,000 | $84,553,208 | $0 | $90,063,208 | |
AF1-099 | $32,000 | $6,400,500 | $91,398,222 | $0 | $97,830,722 | |
AF1-100 | $125,763 | $16,127,747 | $201,634,669 | $0 | $217,888,179 | |
AF1-123 | $4,833,333 | $263,300,000 | $217,174,869 | $0 | $485,308,203 | |
AF1-124 | $4,833,333 | $263,300,000 | $218,341,969 | $0 | $486,475,302 | |
AF1-125 | $4,833,333 | $263,300,000 | $217,838,669 | $0 | $485,972,003 | |
AF1-128 | $1,200,000 | $2,600,000 | $11,116,649 | $0 | $14,916,649 | |
AF1-142 | $32,000 | $6,400,500 | $157,803,346 | $0 | $164,235,846 | |
AF1-152 | $0 | $0 | $5,456,340 | $0 | $5,456,340 | |
AF1-161 | $800,000 | $605,000 | $0 | $0 | $1,405,000 | |
AF1-176 | $1,600,000 | $1,140,000 | $60,104,975 | $0 | $62,844,975 | |
AF1-200 | $2,000,000 | $6,000,000 | $198,152,703 | $0 | $206,152,703 | |
AF1-201 | $700,000 | $10,000,000 | $14,027,405 | $0 | $24,727,405 | |
AF1-204 | $2,380,000 | $70,000 | $215,512 | $0 | $2,665,512 | |
AF1-221 | $1,920,000 | $10,690,000 | $56,997,037 | $0 | $69,607,037 | |
AF1-233 | $1,425,000 | $17,700,000 | $16,770,840 | $0 | $35,895,840 | |
AF1-238 | $0 | $0 | $59,012 | $0 | $59,012 | |
AF1-240 | $504,368 | $0 | $5,458,292 | $0 | $5,962,660 | |
AF1-252 | $100,000 | $0 | $856,337 | $0 | $956,337 | |
AF1-253 | $100,000 | $0 | $592,826 | $0 | $692,826 | |
AF1-256 | $1,545,000 | $17,175,000 | $5,966,007 | $0 | $24,686,007 | |
AF1-266 | $0 | $0 | $19,753,615 | $0 | $19,753,615 | |
AF1-276 | $25,242 | $6,387,982 | $57,769,893 | $0 | $64,183,118 | |
AF1-277 | $25,242 | $6,387,982 | $57,769,893 | $0 | $64,183,118 | |
AF1-278 | $25,242 | $6,387,982 | $39,925,233 | $0 | $46,338,458 | |
AF1-280 | $250,000 | $10,900,610 | $63,835,661 | $0 | $74,986,271 | |
AF1-281 | $250,000 | $10,900,610 | $0 | $0 | $11,150,610 | |
AF1-293 | $700,000 | $10,000,000 | $22,923,253 | $0 | $33,623,253 | |
AF1-294 | $233,333 | $3,333,333 | $16,306,140 | $0 | $19,872,807 | |
AF1-296 | $1,000,000 | $12,000,000 | $22,979,191 | $0 | $35,979,191 | |
AF1-301 | $800,000 | $10,700,000 | $13,789,662 | $0 | $25,289,662 | |
AF1-306 | $91,035 | $3,512,322 | $136,666,685 | $0 | $140,270,042 | |
AF1-314 | $1,000,000 | $19,000,000 | $26,243,389 | $0 | $46,243,389 | |
AF1-318 | $1,000,000 | $13,500,000 | $163,317,597 | $0 | $177,817,597 | |
AF1-323 | $640,000 | $5,436,667 | $14,530,870 | $0 | $20,607,536 | |
AF2-008 | $2,340,000 | $6,270,000 | $43,059,688 | $0 | $51,669,688 | |
AF2-010 | $80,781 | $14,065,914 | $4,272,798 | $0 | $18,419,493 | |
AF2-016 | $800,000 | $1,650,000 | $74,453,987 | $0 | $76,903,987 | |
AF2-021 | $800,000 | $1,600,000 | $17,843,420 | $0 | $20,243,420 | |
AF2-025 | $800,000 | $1,150,000 | $0 | $0 | $1,950,000 | |
AF2-034 | $200,000 | $0 | $0 | $0 | $200,000 | |
AF2-035 | $0 | $0 | $3,180,804 | $0 | $3,180,804 | |
AF2-037 | $400,000 | $3,050,000 | $18,961,345 | $0 | $22,411,345 | |
AF2-041 | $175,943 | $17,396,777 | $37,040,368 | $0 | $54,613,089 | |
AF2-042 | $900,000 | $25,000,000 | $231,855,254 | $0 | $257,755,254 | |
AF2-046 | $700,000 | $5,150,000 | $60,915,299 | $0 | $66,765,299 | |
AF2-047 | $700,000 | $10,000,000 | $135,664,955 | $0 | $146,364,955 | |
AF2-050 | $78,332 | $156,960 | $11,153,458 | $0 | $11,388,750 | |
AF2-056 | $1,257,409 | $234,600 | $91,209,479 | $0 | $92,701,488 | |
AF2-063 | $400,000 | $3,050,000 | $25,366,186 | $0 | $28,816,186 | |
AF2-065 | $400,000 | $5,350,000 | $33,767,655 | $0 | $39,517,655 | |
AF2-068 | $1,600,000 | $2,358,000 | $20,008,483 | $0 | $23,966,483 | |
AF2-069 | $200,000 | $0 | $1,923,279 | $0 | $2,123,279 | |
AF2-070 | $200,000 | $0 | $4,475,349 | $0 | $4,675,349 | |
AF2-080 | $0 | $0 | $12,882,229 | $0 | $12,882,229 | |
AF2-081 | $800,000 | $4,000,000 | $1,004,459 | $0 | $5,804,459 | |
AF2-095 | $3,073,151 | $1,100,913 | $8,966,058 | $0 | $13,140,122 | |
AF2-096 | $1,200,000 | $31,500,000 | $32,164,360 | $0 | $64,864,360 | |
AF2-111 | $1,715,000 | $16,405,000 | $14,912,441 | $0 | $33,032,441 | |
AF2-115 | $233,333 | $3,333,333 | $9,779,526 | $0 | $13,346,193 | |
AF2-120 | $350,000 | $1,900,000 | $23,480,339 | $0 | $25,730,339 | |
AF2-121 | $294,407 | $89,311 | $7,167,226 | $0 | $7,550,944 | |
AF2-126 | $50,962 | $152,886 | $11,994,284 | $0 | $12,198,132 | |
AF2-128 | $1,000,000 | $17,500,000 | $36,928,243 | $0 | $55,428,243 | |
AF2-142 | $200,000 | $0 | $20,943,261 | $0 | $21,143,261 | |
AF2-143 | $200,000 | $0 | $18,526,163 | $0 | $18,726,163 | |
AF2-164 | $67,873 | $6,850,601 | $33,070,134 | $0 | $39,988,608 | |
AF2-171 | $700,000 | $11,300,000 | $73,413,076 | $0 | $85,413,076 | |
AF2-173 | $189,000 | $70,000 | $3,135,323 | $0 | $3,394,323 | |
AF2-176 | $61,616 | $17,088,270 | $7,606,398 | $0 | $24,756,284 | |
AF2-177 | $1,365,000 | $9,940,000 | $2,623,502 | $0 | $13,928,502 | |
AF2-182 | $250,000 | $10,900,610 | $105,943,445 | $0 | $117,094,055 | |
AF2-183 | $250,000 | $10,900,610 | $8,504,684 | $0 | $19,655,294 | |
AF2-193 | $350,000 | $1,750,000 | $122,945,008 | $0 | $125,045,008 | |
AF2-194 | $350,000 | $1,750,000 | $122,945,008 | $0 | $125,045,008 | |
AF2-199 | $175,343 | $17,396,777 | $13,760,030 | $0 | $31,332,150 | |
AF2-200 | $175,943 | $17,396,777 | $36,531,258 | $0 | $54,103,979 | |
AF2-201 | $1,100,000 | $19,000,000 | $19,252,590 | $0 | $39,352,590 | |
AF2-209 | $1,920,000 | $11,366,247 | $53,100,680 | $0 | $66,386,927 | |
AF2-222 | $700,000 | $10,000,000 | $85,439,954 | $0 | $96,139,954 | |
AF2-225 | $200,087 | $0 | $19,495,574 | $0 | $19,695,661 | |
AF2-226 | $200,000 | $0 | $1,967,870 | $0 | $2,167,870 | |
AF2-263 | $250,000 | $4,600,000 | $0 | $0 | $4,850,000 | |
AF2-296 | $238,297 | $1,389,983 | $0 | $0 | $1,628,280 | |
AF2-297 | $700,000 | $3,800,000 | $6,657,756 | $0 | $11,157,756 | |
AF2-299 | $0 | $0 | $2,164,851 | $0 | $2,164,851 | |
AF2-302 | $889,000 | $5,506,667 | $3,703,550 | $0 | $10,099,217 | |
AF2-307 | $0 | $278,000 | $1,701,354 | $0 | $1,979,354 | |
AF2-319 | $200,000 | $0 | $1,967,870 | $0 | $2,167,870 | |
AF2-321 | $73,058 | $16,827,533 | $170,286,336 | $0 | $187,186,927 | |
AF2-324 | $800,000 | $4,000,000 | $10,549,564 | $0 | $15,349,564 | |
AF2-329 | $198,469 | $11,495,441 | $438,603 | $0 | $12,132,513 | |
AF2-335 | $960,000 | $5,690,000 | $244,706 | $0 | $6,894,706 | |
AF2-348 | $1,560,000 | $15,530,000 | $14,622,346 | $0 | $31,712,346 | |
AF2-349 | $1,000,000 | $26,000,000 | $116,085,368 | $0 | $143,085,368 | |
AF2-350 | $550,000 | $9,500,000 | $445,638 | $0 | $10,495,638 | |
AF2-351 | $550,000 | $9,500,000 | $0 | $0 | $10,050,000 | |
AF2-355 | $1,480,000 | $11,010,000 | $5,165,072 | $0 | $17,655,072 | |
AF2-358 | $350,000 | $7,775,000 | $72,067,013 | $0 | $80,192,013 | |
AF2-370 | $1,279,000 | $5,690,000 | $0 | $0 | $6,969,000 | |
AF2-381 | $85,426 | $16,223,038 | $10,781,966 | $0 | $27,090,430 | |
AF2-388 | $1,170,000 | $1,620,000 | $2,558,906 | $0 | $5,348,906 | |
AF2-392 | $333,333 | $6,333,333 | $27,458,940 | $0 | $34,125,606 | |
AF2-393 | $333,333 | $6,333,333 | $2,125,929 | $0 | $8,792,595 | |
AF2-394 | $333,333 | $6,333,333 | $375,073 | $0 | $7,041,740 | |
AF2-396 | $2,670,000 | $1,140,000 | $41,924,420 | $0 | $45,734,420 | |
AF2-397 | $800,000 | $10,700,000 | $27,255,586 | $0 | $38,755,586 | |
AF2-403 | $350,000 | $2,000,000 | $928,096 | $0 | $3,278,096 | |
AF2-404 | $350,000 | $2,000,000 | $418,333 | $0 | $2,768,333 | |
AF2-406 | $80,213 | $24,927,434 | $37,820,860 | $0 | $62,828,507 | |
AF2-407 | $2,340,000 | $6,596,000 | $3,537,326 | $0 | $12,473,326 | |
AF2-412 | $85,426 | $2,250,278 | $94,543,723 | $0 | $96,879,427 | |
AF2-441 | $6,000,000 | $3,000,000 | $5,645,071 | $0 | $14,645,071 | |
AG1-005 | $1,000,000 | $13,500,000 | $99,260,125 | $0 | $113,760,125 | |
AG1-008 | $700,000 | $5,650,000 | $62,093,132 | $0 | $68,443,132 | |
AG1-011 | $800,000 | $4,000,000 | $78,687,193 | $0 | $83,487,193 | |
AG1-019 | $0 | $0 | $57,759,099 | $0 | $57,759,099 | |
AG1-021 | $233,333 | $3,333,333 | $6,838,807 | $0 | $10,405,474 | |
AG1-022 | $829,000 | $5,506,667 | $3,703,550 | $0 | $10,039,217 | |
AG1-030 | $700,000 | $10,000,000 | $77,128,141 | $0 | $87,828,141 | |
AG1-051 | $71,307 | $0 | $1,953,602 | $0 | $2,024,909 | |
AG1-060 | $868,964 | $16,034,931 | $123,589,033 | $0 | $140,492,928 | |
AG1-061 | $700,000 | $16,750,000 | $62,423,133 | $0 | $79,873,133 | |
AG1-075 | $700,000 | $4,000,000 | $18,456,597 | $0 | $23,156,597 | |
AG1-082 | $0 | $0 | $1,179,458 | $0 | $1,179,458 | |
AG1-083 | $0 | $0 | $1,179,458 | $0 | $1,179,458 | |
AG1-090 | $188,000 | $507,287 | $81,396,426 | $0 | $82,091,714 | |
AG1-098 | $800,000 | $10,700,000 | $20,435,502 | $0 | $31,935,502 | |
AG1-105 | $700,000 | $10,000,000 | $12,675,617 | $0 | $23,375,617 | |
AG1-106 | $0 | $0 | $34,599,456 | $0 | $34,599,456 | |
AG1-109 | $1,049,000 | $605,000 | $0 | $0 | $1,654,000 | |
AG1-118 | $1,200,000 | $34,000,000 | $11,079,233 | $0 | $46,279,233 | |
AG1-119 | $600,000 | $17,000,000 | $115,213,682 | $0 | $132,813,682 | |
AG1-120 | $1,200,000 | $30,400,000 | $707,583 | $0 | $32,307,583 | |
AG1-121 | $1,200,000 | $29,200,000 | $160,551,312 | $0 | $190,951,312 | |
AG1-123 | $1,540,000 | $1,770,000 | $2,521,747 | $0 | $5,831,747 | |
AG1-124 | $1,920,000 | $10,990,000 | $35,608,777 | $0 | $48,518,777 | |
AG1-127 | $200,000 | $0 | $732,025 | $0 | $932,025 | |
AG1-133 | $900,000 | $25,000,000 | $14,482,111 | $0 | $40,382,111 | |
AG1-134 | $0 | $0 | $30,641,541 | $0 | $30,641,541 | |
AG1-135 | $700,000 | $10,000,000 | $23,853,777 | $0 | $34,553,777 | |
AG1-146 | $350,000 | $5,000,000 | $9,269,327 | $0 | $14,619,327 | |
AG1-147 | $350,000 | $5,000,000 | $26,675,210 | $0 | $32,025,210 | |
AG1-151 | $0 | $0 | $36,331,305 | $0 | $36,331,305 | |
AG1-153 | $900,000 | $5,000,000 | $1,428,508 | $0 | $7,328,508 | |
AG1-154 | $800,000 | $4,000,000 | $0 | $0 | $4,800,000 | |
AG1-160 | $900,000 | $5,000,000 | $1,455,904 | $0 | $7,355,904 | |
AG1-166 | $140,000 | $1,020,000 | $6,838,807 | $0 | $7,998,807 | |
AG1-167 | $140,000 | $1,020,000 | $6,838,807 | $0 | $7,998,807 | |
AG1-168 | $140,000 | $1,020,000 | $6,838,807 | $0 | $7,998,807 | |
AG1-169 | $140,000 | $1,020,000 | $6,838,807 | $0 | $7,998,807 | |
AG1-170 | $140,000 | $1,020,000 | $6,838,807 | $0 | $7,998,807 | |
AG1-174 | $0 | $0 | $0 | $0 | $0 | |
AG1-178 | $450,000 | $12,500,000 | $177,759,000 | $0 | $190,709,000 | |
AG1-179 | $350,000 | $5,000,000 | $7,375,537 | $0 | $12,725,537 | |
AG1-180 | $350,000 | $5,000,000 | $2,540,033 | $0 | $7,890,033 | |
AG1-181 | $350,000 | $5,000,000 | $55,810,718 | $0 | $61,160,718 | |
AG1-184 | $450,000 | $12,500,000 | $79,114,654 | $0 | $92,064,654 | |
AG1-185 | $350,000 | $5,000,000 | $23,722,850 | $0 | $29,072,850 | |
AG1-194 | $1,600,000 | $1,140,000 | $85,841,657 | $0 | $88,581,657 | |
AG1-195 | $800,000 | $5,500,000 | $8,289,996 | $0 | $14,589,996 | |
AG1-196 | $700,000 | $5,100,000 | $62,174,188 | $0 | $67,974,188 | |
AG1-199 | $85,655 | $4,111,360 | $146,926,223 | $0 | $151,123,238 | |
AG1-219 | $2,390,000 | $70,000 | $20,149,773 | $0 | $22,609,773 | |
AG1-224 | $1,920,000 | $11,040,000 | $4,184,038 | $0 | $17,144,038 | |
AG1-225 | $1,600,000 | $1,140,000 | $64,358,891 | $0 | $67,098,891 | |
AG1-226 | $2,730,000 | $21,470,000 | $6,175,774 | $0 | $30,375,774 | |
AG1-236 | $350,000 | $0 | $0 | $0 | $350,000 | |
AG1-257 | $149,063 | $583,939 | $3,212,516 | $0 | $3,945,518 | |
AG1-272 | $175,000 | $950,000 | $7,026,559 | $0 | $8,151,559 | |
AG1-273 | $175,000 | $950,000 | $7,026,559 | $0 | $8,151,559 | |
AG1-274 | $175,000 | $950,000 | $7,026,559 | $0 | $8,151,559 | |
AG1-277 | $9,144,677 | $234,552 | $27,751,488 | $0 | $37,130,717 | |
AG1-278 | $9,144,677 | $234,552 | $0 | $0 | $9,379,229 | |
AG1-279 | $9,144,677 | $234,552 | $0 | $0 | $9,379,229 | |
AG1-284 | $700,000 | $3,800,000 | $12,008,296 | $0 | $16,508,296 | |
AG1-285 | $700,000 | $10,000,000 | $50,815,924 | $0 | $61,515,924 | |
AG1-288 | $350,000 | $2,000,000 | $2,746,879 | $0 | $5,096,879 | |
AG1-289 | $35,000 | $2,000,000 | $0 | $0 | $2,035,000 | |
AG1-297 | $2,730,000 | $21,995,000 | $9,114,890 | $0 | $33,839,890 | |
AG1-298 | $1,200,000 | $31,500,000 | $58,350,790 | $0 | $91,050,790 | |
AG1-305 | $800,000 | $6,100,000 | $22,495,732 | $0 | $29,395,732 | |
AG1-306 | $745,000 | $4,782,500 | $864,084 | $0 | $6,391,584 | |
AG1-308 | $2,600,049 | $0 | $3,961,753 | $0 | $6,561,802 | |
AG1-319 | $0 | $0 | $122,161,653 | $0 | $122,161,653 | |
AG1-321 | $1,200,000 | $32,000,000 | $101,304,652 | $0 | $134,504,652 | |
AG1-342 | $700,000 | $3,800,000 | $5,167,411 | $0 | $9,667,411 | |
AG1-343 | $700,000 | $10,000,000 | $15,696,859 | $0 | $26,396,859 | |
AG1-346 | $700,000 | $3,800,000 | $155,397 | $0 | $4,655,397 | |
AG1-353 | $1,605,000 | $13,235,000 | $12,560,134 | $0 | $27,400,134 | |
AG1-354 | $1,575,000 | $12,025,000 | $19,714,601 | $0 | $33,314,601 | |
AG1-359 | $800,000 | $4,000,000 | $16,863,825 | $0 | $21,663,825 | |
AG1-364 | $700,000 | $3,800,000 | $2,990,733 | $0 | $7,490,733 | |
AG1-367 | $189,000 | $70,000 | $1,576,816 | $0 | $1,835,816 | |
AG1-371 | $175,943 | $17,396,777 | $4,199,248 | $0 | $21,771,968 | |
AG1-373 | $175,943 | $17,396,777 | $0 | $0 | $17,572,721 | |
AG1-374 | $1,200,000 | $6,000,000 | $51,200,084 | $0 | $58,400,084 | |
AG1-375 | $1,614,000 | $10,010,000 | $1,324,365 | $0 | $12,948,365 | |
AG1-377 | $188,000 | $507,287 | $3,981,796 | $0 | $4,677,084 | |
AG1-378 | $188,000 | $507,287 | $3,981,796 | $0 | $4,677,084 | |
AG1-379 | $350,000 | $0 | $110,002,278 | $0 | $110,352,278 | |
AG1-384 | $175,000 | $950,000 | $7,026,559 | $0 | $8,151,559 | |
AG1-389 | $21,118 | $3,879,238 | $8,771,528 | $0 | $12,671,884 | |
AG1-390 | $21,118 | $3,879,238 | $8,771,528 | $0 | $12,671,884 | |
AG1-391 | $21,118 | $3,879,238 | $21,203,880 | $0 | $25,104,236 | |
AG1-392 | $21,118 | $3,879,238 | $21,203,880 | $0 | $25,104,236 | |
AG1-393 | $0 | $0 | $1,643,367 | $0 | $1,643,367 | |
AG1-394 | $0 | $0 | $2,191,054 | $0 | $2,191,054 | |
AG1-399 | $300,000 | $7,875,000 | $55,903,351 | $0 | $64,078,351 | |
AG1-400 | $300,000 | $7,875,000 | $25,682,199 | $0 | $33,857,199 | |
AG1-402 | $300,000 | $7,875,000 | $25,682,199 | $0 | $33,857,199 | |
AG1-404 | $300,000 | $7,875,000 | $27,751,092 | $0 | $35,926,092 | |
AG1-410 | $1,365,000 | $12,407,621 | $10,412,047 | $0 | $24,184,668 | |
AG1-411 | $1,684,000 | $12,407,621 | $3,470,682 | $0 | $17,562,303 | |
AG1-412 | $800,000 | $10,700,000 | $19,535,212 | $0 | $31,035,212 | |
AG1-421 | $400,000 | $5,350,000 | $77,740,797 | $0 | $83,490,797 | |
AG1-422 | $400,000 | $5,350,000 | $30,221,776 | $0 | $35,971,776 | |
AG1-423 | $600,000 | $17,000,000 | $68,589,756 | $0 | $86,189,756 | |
AG1-424 | $1,670,000 | $1,070,000 | $29,849,990 | $0 | $32,589,990 | |
AG1-425 | $0 | $0 | $9,700,000 | $0 | $9,700,000 | |
AG1-426 | $319,000 | $0 | $1,527,106 | $0 | $1,846,106 | |
AG1-427 | $700,000 | $10,000,000 | $46,076,402 | $0 | $56,776,402 | |
AG1-428 | $0 | $0 | $5,010,999 | $0 | $5,010,999 | |
AG1-432 | $700,000 | $10,000,000 | $106,831,109 | $0 | $117,531,109 | |
AG1-433 | $1,419,000 | $1,620,000 | $420,857 | $0 | $3,459,857 | |
AG1-434 | $1,200,000 | $31,500,000 | $40,438,481 | $0 | $73,138,481 | |
AG1-435 | $1,200,000 | $26,500,000 | $102,153,362 | $0 | $129,853,362 | |
AG1-436 | $319,000 | $0 | $4,264,839 | $0 | $4,583,839 | |
AG1-437 | $200,000 | $2,675,000 | $39,349,099 | $0 | $42,224,099 | |
AG1-438 | $200,000 | $2,675,000 | $39,349,099 | $0 | $42,224,099 | |
AG1-439 | $400,000 | $2,000,000 | $70,698,788 | $0 | $73,098,788 | |
AG1-440 | $175,000 | $950,000 | $8,043,377 | $0 | $9,168,377 | |
AG1-441 | $175,000 | $950,000 | $8,043,377 | $0 | $9,168,377 | |
AG1-442 | $200,000 | $2,675,000 | $13,191,579 | $0 | $16,066,579 | |
AG1-443 | $200,000 | $2,675,000 | $13,191,579 | $0 | $16,066,579 | |
AG1-444 | $400,000 | $2,000,000 | $22,827,449 | $0 | $25,227,449 | |
AG1-445 | $175,000 | $950,000 | $586,530 | $0 | $1,711,530 | |
AG1-446 | $175,000 | $950,000 | $586,530 | $0 | $1,711,530 | |
AG1-447 | $259,000 | $0 | $1,867,731 | $0 | $2,126,731 | |
AG1-449 | $450,000 | $12,500,000 | $48,576,814 | $0 | $61,526,814 | |
AG1-450 | $350,000 | $7,775,000 | $5,092,059 | $0 | $13,217,059 | |
AG1-451 | $0 | $0 | $7,575,004 | $0 | $7,575,004 | |
AG1-453 | $1,355,000 | $535,000 | $1,103,159 | $0 | $2,993,159 | |
AG1-454 | $1,604,000 | $535,000 | $48,507 | $0 | $2,187,507 | |
AG1-456 | $319,000 | $0 | $3,601,024 | $0 | $3,920,024 | |
AG1-460 | $550,000 | $12,000,000 | $155,779 | $0 | $12,705,779 | |
AG1-462 | $2,000,000 | $12,000,000 | $37,283,341 | $0 | $51,283,341 | |
AG1-471 | $1,455,000 | $20,815,000 | $1,536,084 | $0 | $23,806,084 | |
AG1-473 | $75,727 | $18,313,740 | $35,882,893 | $0 | $54,272,360 | |
AG1-483 | $0 | $1,200,000 | $0 | $0 | $1,200,000 | |
AG1-488 | $3,420,000 | $0 | $33,504,182 | $0 | $36,924,182 | |
AG1-494 | $1,920,000 | $10,860,000 | $2,527,400 | $0 | $15,307,400 | |
AG1-497 | $700,000 | $4,500,000 | $6,685,664 | $0 | $11,885,664 | |
AG1-505 | $450,000 | $12,500,000 | $66,272,446 | $0 | $79,222,446 | |
AG1-506 | $450,000 | $12,500,000 | $66,272,446 | $0 | $79,222,446 | |
AG1-522 | $682,500 | $12,155,000 | $15,364,291 | $0 | $28,201,791 | |
AG1-523 | $1,001,500 | $12,155,000 | $15,364,291 | $0 | $28,520,791 | |
AG1-524 | $941,500 | $12,155,000 | $15,364,291 | $0 | $28,460,791 | |
AG1-525 | $941,500 | $12,155,000 | $15,364,291 | $0 | $28,460,791 | |
AG1-526 | $520,000 | $4,635,000 | $3,991,541 | $0 | $9,146,541 | |
AG1-529 | $700,000 | $4,500,000 | $4,121,115 | $0 | $9,321,115 | |
AG1-531 | $800,000 | $10,700,000 | $6,739,210 | $0 | $18,239,210 | |
AG1-535 | $1,200,000 | $26,500,000 | $2,333,537 | $0 | $30,033,537 | |
AG1-536 | $350,000 | $1,900,000 | $25,164,263 | $0 | $27,414,263 | |
AG1-537 | $700,000 | $1,300,000 | $1,131,808 | $0 | $3,131,808 | |
AG1-538 | $800,000 | $1,500,000 | $3,170,303 | $0 | $5,470,303 | |
AG1-539 | $2,100,000 | $5,500,000 | $13,789,681 | $0 | $21,389,681 | |
AG1-547 | $700,000 | $10,000,000 | $6,855,791 | $0 | $17,555,791 | |
AG1-548 | $186,070 | $16,026,744 | $43,051,228 | $0 | $59,264,042 | |
AG1-549 | $90,384 | $3,385,634 | $7,652,885 | $0 | $11,128,903 | |
AG1-551 | $0 | $0 | $0 | $0 | $0 | |
AG1-552 | $0 | $0 | $502,049 | $0 | $502,049 | |
AG1-553 | $2,000,000 | $12,000,000 | $94,228,595 | $0 | $108,228,595 | |
AG1-556 | $700,000 | $5,100,000 | $118,800,022 | $0 | $124,600,022 |
Note 1: "PJM Identified Cost Allocation of Network Upgrades ($)” identifies each individual project’s cost allocation towards a required network upgrade to address reliability criteria violations identified by PJM.
Note 2: “TO Network Upgrades” identifies (i) each individual project’s physical interconnection facility cost as well as (ii) each individual project’s cost allocation for any network upgrades required to address TO reliability criteria violations.
5.0 Network Impacts Identified for Transition Cycle #1, Phase I
5.1 Violations identified by Thermal Analysis (Load flow)
PJM performed generator deliverability load flow analysis for the New Service Requests in Transition Cycle #1 Phase I. Load flow analysis was performed to simulate Summer Peak, Light Load and Winter Peak[1] conditions. Table 3 below shows all the system reinforcements identified from generator deliverability load flow analysis.
Table 3: System reinforcements identified from generator deliverability load flow analysis for Transition Cycle #1 Phase I | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
TO | RTEP ID / TO ID | Title | Time Estimate | Total Cost Estimate ($) | Projects with Cost Allocation | Contingent Projects | |||||
AEC | (Pending) / AEC_TC1_CircuitSwitcher |
Upgrade circuit switcher at Mickleton for DELCOTAP 230 KV to MCKLTON 230 KV ckt 1 |
TBD | $600,000 |
AF2-193, AF2-194, AG1-061 |
|
|||||
AEC | b3737.26 |
To mitigate the relay limits on this line the relay settings will be changed (Projected ISD 4/30/2028) |
Apr 30 2028 | $300,000 |
|
AF1-238, AF2-016, AF2-021 |
|||||
AEC | n6342 / at2310r0001 |
Rebuild Cardiff New Freedom 230 kV line. (Securitized by AE2-021) |
60 Months | $105,000,000 |
|
AF2-016, AF2-021 |
|||||
AEC | n7868 / ACEMickDelcorebuildr01 |
ACEMickDelcorebuildr01: Rebuild 7.6 miles of Mickleton to Delco Tap 230 kV line. |
54 to 66 Months | $34,200,000 |
AF2-193, AF2-194, AG1-061 |
|
|||||
AEP | (Pending) / AEPAPRJV001 |
Replace first span out of East Danville consisting of 1033 ACSR |
18 to 24 Months | $812,500 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-124, AG1-539, AG1-547 |
AG1-123, AG1-494 |
|||||
AEP | (Pending) / AEPAPRJV002 |
Perform sag study on 397 ACSR between Clifford and Boxwood (13.7 miles) |
24 to 36 Months | $82,200 |
AF1-323, AF2-302, AG1-022, AG1-426 |
|
|||||
AEP | (Pending) / AEPAPRJV004 |
Replace wavetrap @ New London |
18 to 24 Months | $260,000 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
AF2-403 |
|||||
AEP | (Pending) / AEPAPRJV005 |
Replace 1590 AAC station conductor @ New London |
18 to 24 Months | $227,500 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
AF2-403 |
|||||
AEP | (Pending) / AEPAPRJV006 |
Replace 795 AAC station conductor @ Otter |
18 to 24 Months | $227,500 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
AF2-403 |
|||||
AEP | (Pending) / AEPAPRJV007 |
Sag study AE1-108-Bremo AEP-owned portion of line segment (0.6 miles) |
24 to 36 Months | $25,000 |
AF1-323, AF2-302, AG1-022, AG1-123, AG1-124, AG1-426, AG1-494 |
AE2-185, AE2-187, AE2-283 |
|||||
AEP | (Pending) / AEPAPRJV008 |
Rebuild AEP owned portion of AE1-108 TP 138 KV to 4BREMO 138 KV ckt 1 (0.6 miles) |
24 to 36 Months | $1,950,000 |
AF1-323, AF2-302, AG1-022, AG1-123, AG1-124, AG1-426, AG1-494 |
AE2-185, AE2-187, AE2-283 |
|||||
AEP | (Pending) / AEPIMJMS01 |
Rebuild Olive - AF2-359 345kV |
30 to 36 Months | $35,000,000 |
AE1-070, AE1-114, AE1-172, AE2-321, AE2-341, AF1-030, AF1-200, AF1-296, AF1-314, AF1-318, AF2-041, AF2-095, AF2-096, AF2-142, AF2-143, AF2-200, AF2-201, AF2-349, AF2-350, AF2-392, AF2-441, AG1-118, AG1-119, AG1-121, AG1-127, AG1-298, AG1-379, AG1-423, AG1-434, AG1-435, AG1-436, AG1-447, AG1-553 |
|
|||||
AEP | (Pending) / AEPIMJMS02 |
Replace 2156 KCM ACSR 84/19 at Olive |
18 to 24 Months | $1,130,000 |
AE1-070, AE1-114, AE1-172, AE2-321, AE2-341, AF1-030, AF1-200, AF1-296, AF1-314, AF1-318, AF2-041, AF2-095, AF2-096, AF2-142, AF2-143, AF2-200, AF2-201, AF2-349, AF2-350, AF2-392, AF2-441, AG1-118, AG1-119, AG1-121, AG1-127, AG1-298, AG1-379, AG1-423, AG1-434, AG1-435, AG1-436, AG1-447, AG1-553 |
|
|||||
AEP | (Pending) / AEPIMJMS03 |
Adjust Relay Compliance Trip Limit at Olive |
18 to 24 Months | $25,000 |
AE1-070, AE1-114, AE1-172, AE2-321, AE2-341, AF1-030, AF1-200, AF1-296, AF1-314, AF1-318, AF2-041, AF2-095, AF2-096, AF2-142, AF2-143, AF2-200, AF2-201, AF2-349, AF2-350, AF2-392, AF2-441, AG1-118, AG1-119, AG1-121, AG1-127, AG1-298, AG1-379, AG1-423, AG1-434, AG1-435, AG1-436, AG1-447, AG1-553 |
|
|||||
AEP | (Pending) / AEPIMJMS04 |
Replace 2874 KCM ACSR 72/7 at Olive |
18 to 24 Months | $455,000 |
AE1-070, AE1-114, AE1-172, AE2-321, AE2-341, AF1-030, AF1-200, AF1-296, AF1-314, AF1-318, AF2-041, AF2-095, AF2-096, AF2-142, AF2-143, AF2-200, AF2-201, AF2-349, AF2-350, AF2-392, AF2-441, AG1-118, AG1-119, AG1-121, AG1-127, AG1-298, AG1-379, AG1-423, AG1-434, AG1-435, AG1-436, AG1-447, AG1-553 |
|
|||||
AEP | (Pending) / AEPOPJSL01 |
Reconductor/rebuild; use at least ACSR 1272 |
24 to 36 Months | $31,395,000 |
AF2-209, AF2-321, AG1-319, AG1-424 |
AF2-126 |
|||||
AEP | (Pending) / AEPSERG01 |
Rebuild 0.22 miles of the College Corner - Collinsville 138 kV AEP section with 556 ACSR 26/7 Dove conductor. |
18 to 24 Months | $500,000 |
AF1-221, AF2-068 |
|
|||||
AEP | (Pending) / AEPSERG04 |
Rebuild ~4.6 miles of the Pennville - AE2-089 138 kV line conductor |
24 to 36 Months | $11,960,000 |
AG1-225 |
|
|||||
AEP | (Pending) / AEPSERG05 |
Upgrade Pennville 138 kV bus currently 2 IPS Sch 40. |
18 to 24 Months | $227,500 |
AG1-225 |
|
|||||
AEP | (Pending) / AEPSERG06 |
Replace (2) Pennville 138 kV 2000 kCM AAC 91-Str risers |
18 to 24 Months | $455,000 |
AG1-225 |
|
|||||
AEP | (Pending) / AEPSERG07 |
Replace Pennville 138 kV bus 2 IPS Sch. 40 |
18 to 24 Months | $227,500 |
AG1-225 |
|
|||||
AEP | (Pending) / AEPSERG08 |
Replace Jefferson risers 3-2500 kCM AAC 91-Str |
18 to 24 Months | $682,500 |
AE2-130, AE2-261, AF1-088, AF1-204, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | (Pending) / AEPSERG09 |
Jefferson CT thermal limit |
12 to 18 Months | $25,000 |
AE2-130, AE2-261, AF1-088, AF1-204, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | (Pending) / AEPSERG10 |
Clifty relay thermal limit |
12 to 18 Months | $25,000 |
AE2-130, AE2-261, AF1-088, AF1-204, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | (Pending) / AEPSERG11 |
Jefferson - Clifty OVEC conductor - line rebuild |
18 to 24 Months | $3,380,000 |
AE2-130, AE2-261, AF1-088, AF1-204, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | (Pending) / AEPSERG12 |
Replace (3) Jefferson 345 kV 5000 A switches |
24 to 30 Months | $1,950,000 |
AE2-130, AE2-261, AF1-088, AF1-204, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | (Pending) / AEPSERG13 |
At Jefferson station install a second 765/345 kV 750 MVA transformer to connect to the Jefferson 765 kV bus #1 and a second Jefferson - Clifty 345 kV line to connect to the Jefferson 345 kV bus 1 |
36 to 48 Months | $35,000,000 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | (Pending) / AEPSERG14 |
Replace 4 Pennville 795 AAC risers |
18 to 24 Months | $910,000 |
AG1-225 |
|
|||||
AEP | (Pending) / AEPSERG15 |
Replace 2 Pennville 795 ACSR 26/7 risers |
18 to 24 Months | $455,000 |
AG1-225 |
|
|||||
AEP | (Pending) / AEPSERG16 |
Replace 138 kV goab switch. |
18 to 24 Months | $325,000 |
AG1-225 |
|
|||||
AEP | (Pending) / AEPSERG17 |
Upgrade Jefferson 345kV 3-2500 AAC risers |
18 to 24 Months | $682,500 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | (Pending) / AEP_TC1_15474 |
Replace 345kV CB A1 and Tie CB A at Meadow Lake |
18 to 24 Months | $6,500,000 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | (Pending) / AEP_TC1_15494 |
Replacement of the 138 kV Gang-operated Air-break (GOAB) switch at Otter |
12 to 18 Months | $325,000 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
AF2-403 |
|||||
AEP | b3748 |
Replace four Clifty Creek 345 kV 3000A switches with 5000 A 345 kV switches |
Jun 28 2024 | $850,000 |
|
AE2-130, AE2-261, AF1-088, AF1-200, AF2-008, AF2-096, AG1-226, AG1-298, AG1-522, AG1-523, AG1-524, AG1-525 |
|||||
AEP | b3775.10 |
Sag study on the Olive – University Park |
Dec 01 2026 | $0 |
|
AE1-070, AE1-114, AE2-341, AF1-200, AF1-296, AF1-314, AF1-318, AF2-041, AF2-142, AF2-143, AF2-200, AF2-349, AF2-392, AF2-441, AG1-118, AG1-119, AG1-121, AG1-298, AG1-321, AG1-379, AG1-423, AG1-435, AG1-553 |
|||||
AEP | b3775.11 |
Upgrade the limiting element at Stillwell substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating. NIPS SN/SE ratings of 1525/1832 MVA post upgrade. |
Dec 01 2026 | $0 |
|
AE1-070, AE2-223, AF1-200, AF1-296, AF1-318, AF2-041, AF2-182, AF2-349, AF2-441, AG1-118, AG1-119, AG1-121, AG1-298, AG1-379, AG1-435, AG1-535, AG1-553 |
|||||
AEP | b3775.6 |
Perform sag study mitigation work on the Dumont-Stillwell 345 kV line |
Dec 01 2026 | $0 |
|
AE1-070, AF1-200, AF2-041, AF2-182, AF2-349, AF2-441, AG1-118, AG1-119, AG1-298, AG1-379, AG1-535 |
|||||
AEP | b3775.7 |
Upgrade limiting element at Dumont substation on the Stillwell-Dumont 345 kV line. |
Dec 01 2026 | $0 |
|
AE1-070, AF1-200, AF2-041, AF2-182, AF2-349, AF2-441, AG1-118, AG1-119, AG1-298, AG1-379, AG1-535 |
|||||
AEP | b3788.1 / B3788 |
Replace limiting station elements at Kyger Creek |
Jun 01 2028 | $0 |
|
AE2-130, AF1-088, AF1-204, AF2-008, AF2-111, AF2-348, AF2-407, AG1-297 |
|||||
AEP | n4056.1 / AEPI0048a |
Replace the (1) 3000A 765kV CB at Dumont station |
18 to 24 Months | $3,900,000 |
|
AF1-200, AF2-095, AF2-096, AF2-441, AG1-298 |
|||||
AEP | n4106.3 |
Extend One (1) Tower on the Jefferson - Clifty Creek (IKEC) 345 kV Circuit |
12 to 18 Months | $409,714 |
|
AE2-130, AE2-261, AF1-088, AF1-200, AF2-008, AF2-096, AG1-226, AG1-298, AG1-522, AG1-523, AG1-524, AG1-525 |
|||||
AEP | n4106.4 |
Rebuild 0.75 miles of ACSR ~ 2156 ~ 64/19 ~ BLUEBIRD conductor to mitigate the overload. |
24 to 36 Months | $3,250,000 |
AE2-130, AE2-261, AF1-088, AF1-204, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n4106.5 / AEPI0045c |
Replace Clifty Bus 5"0 AL Tubular Sch 40 |
18 to 24 Months | $130,000 |
AE2-130, AE2-261, AF1-088, AF1-204, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n4106.6 / AEPI0045e |
Replace Jefferson Breaker (5000A) |
18 to 24 Months | $1,560,000 |
AE2-130, AE2-261, AF1-088, AF1-204, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n4106.7 / AEPI0045f |
An engineering study will need to be conducted to determine if the Jefferso [...] l be required if the settings cannot be adjusted. Estimated Cost: $600,000. |
12 to 18 Months | $32,500 |
AE2-130, AE2-261, AF1-088, AF1-204, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n5472 / N5472 |
A Sag Study will be required on the 10 miles ofACSR ~ 477 ~ 26/7 ~ HA [...] n time would be 24 to 36 months after signing an interconnection agreement. |
6 to 12 Months | $186,000 |
|
AE1-144, AE2-038, AE2-138, AE2-210, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AG1-456 |
|||||
AEP | n5613 / AEPA0014a |
Rebuild 0.9 miles of the Otter - Alta Vista 138 kV line |
24 to 36 Months | $2,740,849 |
|
AE2-292, AF2-403, AG1-539, AG1-547 |
|||||
AEP | n5769.1 |
Perform engineering study for CT limits , and and relay compliance trip limits at Dumont substation |
12 to 18 Months | $780,000 |
AE1-070, AE1-114, AE1-172, AE2-223, AE2-341, AF1-200, AF1-280, AF1-296, AF1-314, AF1-318, AF2-041, AF2-095, AF2-096, AF2-142, AF2-143, AF2-182, AF2-200, AF2-349, AF2-392, AF2-441, AG1-118, AG1-119, AG1-121, AG1-298, AG1-321, AG1-379, AG1-423, AG1-434, AG1-435, AG1-535, AG1-553 |
|
|||||
AEP | n5769.3 |
Replace 11 jumpers/risers at Dumont substation |
18 to 24 Months | $357,500 |
AE1-070, AE1-114, AE1-172, AE2-341, AF1-200, AF1-280, AF1-314, AF2-041, AF2-095, AF2-096, AF2-142, AF2-143, AF2-182, AF2-200, AF2-349, AF2-392, AF2-441, AG1-118, AG1-119, AG1-298, AG1-321, AG1-379, AG1-423, AG1-434, AG1-535 |
|
|||||
AEP | n5769.4 / AEPI0066a |
Rebuild/Recondutor 8.6 miles of ACSR ~ 954 ~ 45/7 ~ RAIL conductor to mitigate the overload |
24 to 36 Months | $22,360,000 |
AE1-070, AE1-114, AE1-172, AE2-341, AF1-200, AF1-280, AF1-314, AF2-041, AF2-095, AF2-096, AF2-142, AF2-143, AF2-182, AF2-200, AF2-349, AF2-392, AF2-441, AG1-118, AG1-119, AG1-298, AG1-321, AG1-379, AG1-423, AG1-434, AG1-535 |
|
|||||
AEP | n5769.5 / AEP_AD2_REF_r0001 |
Replace 4 Dumont switches (3000 A). |
TBD | $3,120,000 |
AE1-070, AE1-114, AE1-172, AE2-341, AF1-200, AF1-280, AF1-314, AF2-041, AF2-095, AF2-096, AF2-142, AF2-143, AF2-182, AF2-200, AF2-349, AF2-392, AF2-441, AG1-118, AG1-119, AG1-298, AG1-321, AG1-379, AG1-423, AG1-434, AG1-535 |
|
|||||
AEP | n5857 / N5857 |
Rebuild / reconductor 10 miles of ACSR ~ 477 ~ 26/7 ~ HAWK- Conductor Section 1. Estimated cost: $15 million. |
24 to 36 Months | $19,552,000 |
AE1-144, AE2-038, AE2-138, AF1-233, AF1-256, AF2-111, AF2-348, AG1-456 |
AE2-210, AF2-307 |
|||||
AEP | n5913 / AEPI0042a |
Olive - Green Acre 345 kV Line Sag Study on the 40.64 miles of conductor. |
24 to 36 Months | $211,328 |
AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-392, AF2-441, AG1-121, AG1-298, AG1-434, AG1-435, AG1-553 |
|
|||||
AEP | n6123 / AEPI0005a |
A Sag Study will be required on the 0.15 mile section of line to mitigate t [...] n time would be 24 to 36 months after signing an interconnection agreement. |
24 to 36 Months | $26,000 |
AF1-221, AF2-068 |
|
|||||
AEP | n6224 / AEPA0020a |
Rebuild/reconductor ACSR ~ 397.5 ~ 6.6 miles |
18 to 24 Months | $12,675,000 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
AF2-297, AF2-403, AG1-105 |
|||||
AEP | n6241 / AEPA0019a and AEPA0019b |
AEPA0019a and AEPA0019b |
24 to 36 Months | $13,877,500 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
AF2-297, AF2-403, AG1-105 |
|||||
AEP | n6457.2 / AEPA0010b |
Replace 138 kV station conductor at Banister (Sub cond 1590 AAC 61 Str.) |
18 to 24 Months | $130,000 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-124, AG1-539, AG1-547 |
AG1-123, AG1-494 |
|||||
AEP | n6461 / AEPO0040a |
A Sag Study will be required on the 24 miles ofACSR ~ 477 ~ 26/7 ~ HA [...] n time would be 24 to 36 months after signing an interconnection agreement. |
24 to 36 Months | $124,800 |
AE1-144, AE2-038, AE2-138, AF1-233, AF1-256, AF2-111, AF2-348 |
AE2-210, AF2-307 |
|||||
AEP | n6497.4 / AEPI0002e/f |
AEPI0002e: Replace 3 3000A Wavetraps at Rockport $150k; AEPI0002f Replace 3 3000A Wavetraps at Jefferson $150k |
18 to 24 Months | $554,446 |
AE2-130, AF1-088, AF2-008, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n6600 / AEPI0001a |
Replace Dumont Circuit Breaker B1 |
18 to 24 Months | $3,900,000 |
AE1-172, AF1-200, AF1-314, AF1-318, AF2-441, AG1-121, AG1-298, AG1-434 |
|
|||||
AEP | n6999 / AEPI0024a |
Replace Tanner's Creek 345 kV Riser (Sub Cond 2870 MCM ACSR) |
18 to 24 Months | $130,000 |
|
AG1-225, AG1-297, AG1-367, AG1-375, AG1-433 |
|||||
AEP | n7079 |
Replace 10 345 kV Desoto Risers (Sub Cond 22156 ACSR 84/19 STD). |
18 to 24 Months | $1,300,000 |
AF1-221, AF2-068, AF2-173, AF2-177, AF2-335, AF2-388, AG1-225, AG1-367, AG1-375, AG1-433 |
|
|||||
AEP | n7467 / AEPO0047a |
Replace one Marysville 765kV CB |
18 to 24 Months | $3,900,000 |
|
AF1-176, AF1-200, AF2-095, AF2-096, AF2-396, AF2-441, AG1-298 |
|||||
AEP | n7467.1 |
Replace three Marysville 765kV Wavetraps (3000A) |
Dec 31 2024 | $1,950,000 |
AF1-176, AF1-200, AF2-095, AF2-096, AF2-396, AF2-441, AG1-298 |
|
|||||
AEP | n7516 / AEPA0039a |
Replace 4Bradley Sub cond 300 MCM CU 37 Str |
18 to 24 Months | $520,000 |
AG1-194, AG1-219 |
|
|||||
AEP | n7618 / AEPI0081a |
Replace two Meadowlake CBs (3000A) |
Dec 31 2024 | $6,500,000 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n7672 / AEPI0054a |
Replace 765 AAC 37 STR Riser at Dupont station toward WoodsRd |
18 to 24 Months | $130,000 |
AG1-453, AG1-454 |
|
|||||
AEP | n7683 |
Rebuild/reconductor 3.05 mi. of the 1275 ACSR/PE 54/19 conductor with 2-954 ACSR 54/7 conductor size with a SN rating of 1410 MVA. |
Jan 31 2025 | $18,460,000 |
AF2-396, AG1-225, AG1-410, AG1-411, AG1-453 |
|
|||||
AEP | n7751 / AEPI0077a |
Replace 1600A Switches at Sorenson 345kV |
18 to 24 Months | $130,000 |
AF2-173, AF2-177, AF2-388, AF2-407, AG1-224, AG1-367, AG1-375, AG1-433 |
|
|||||
AEP | n7751.1 |
Replace 2156 ACSR 84/19 Bus at Sorenson 345kV |
18 to 24 Months | $130,000 |
AF2-173, AF2-177, AF2-388, AF2-407, AG1-224, AG1-367, AG1-375, AG1-433 |
|
|||||
AEP | n7757 / AEPI0063a |
Replace the Desoto 138 kV bus 3' AL tubular |
Dec 31 2024 | $130,000 |
AF2-173, AF2-177, AF2-388, AG1-367, AG1-375, AG1-433 |
|
|||||
AEP | n7811 / AEPA0034a |
A sag study will be required on the 0.85 miles of ACSR ~ 397.5 ~ 30/7 |
Sep 01 2024 | $4,420 |
AF1-323, AF2-302, AG1-022, AG1-123, AG1-124, AG1-494 |
AE2-185, AE2-187, AE2-283, AG1-547 |
|||||
AEP | n7925.1 / AEPI0010a |
Reconductor/rebuild 0.17 miles of ACAR ~ 1024.5 ~ 30/7 ~ conductor section 5 |
24 to 36 Months | $2,132,000 |
|
AE2-130, AE2-261, AF1-088 |
|||||
AEP | n7925.2 / AEPI0010b |
Reconductor/rebuild 1 miles of ACAR ~ 1024.5 ~ 30/7 ~ RAIL1 conductor section 6 |
24 to 36 Months | $2,600,000 |
AE1-172, AE2-223, AE2-261, AF1-088, AF1-296, AF1-318, AF2-182, AF2-225, AG1-005, AG1-121, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404, AG1-435, AG1-462, AG1-553 |
|
|||||
AEP | n7925.3 / AEPI0010c |
Replace two sullivan 3000A Wavetrap |
18 to 24 Months | $520,000 |
AE1-172, AE2-223, AE2-261, AF1-088, AF1-296, AF1-318, AF2-182, AF2-225, AG1-005, AG1-121, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404, AG1-435, AG1-462, AG1-553 |
|
|||||
AEP | n7925.4 / AEPI0010d |
Replace three 2-2000 AAC 91 Str |
18 to 24 Months | $390,000 |
AE1-172, AE2-223, AE2-261, AF1-088, AF1-296, AF1-318, AF2-182, AF2-225, AG1-005, AG1-121, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404, AG1-435, AG1-462, AG1-553 |
|
|||||
AEP | n7925.5 / AEPI0010e |
Reconductor/rebuild 0.2 miles of ACAR ~ 1315.5 ~ 45/7 ~ DIPPER conductor sec 3, 1 |
24 to 36 Months | $520,000 |
AE1-172, AE2-223, AE2-261, AF1-088, AF1-296, AF1-318, AF2-182, AF2-225, AG1-005, AG1-121, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404, AG1-435, AG1-462, AG1-553 |
|
|||||
AEP | n7943.2 / AEPI0025b |
Replace Jefferson 345kV Circuit Breaker (5000A) |
18 to 24 Months | $1,560,000 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n7943.3 / AEPI0025c |
An engineering study will need to be conducted to determine if the Jefferso [...] l be required if the settings cannot be adjusted. Estimated Cost: $600,000. |
12 to 18 Months | $32,500 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n7943.4 / AEPI0025d |
Replace 9 Jefferson 5000 A switches |
18 to 24 Months | $5,850,000 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n7943.5 / AEPI0025e |
Replace 2 Jefferson (Sub cond 3-2500 kcm AAC 91 Str) |
18 to 24 Months | $260,000 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n7964 / AEPI0025a |
Replace 765/345 Transformer |
24 to 36 Months | $7,800,000 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n7980.1 / AEPI0036a |
Rebuild 3.83 miles of 2303.5 ACAR , conductor section 1 |
24 to 36 Months | $9,958,000 |
AE2-130, AF1-088, AF2-008, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n7980.2 / AEPI0036b |
Rebuild 47.02 miles of 1414 ACSR/PE, conductor section 2 |
24 to 36 Months | $122,200,000 |
AE2-130, AF1-088, AF2-008, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
AEP | n8319 |
CON Upgrade: Relocate the East Bend 345kV line from the T bay to the R bay at the Tanners Creek 345kV substation. |
12 to 18 Months | $3,100,000 |
|
AF1-221, AF2-068, AF2-173, AF2-177, AF2-388, AF2-407, AG1-224, AG1-225, AG1-297, AG1-367, AG1-375 |
|||||
AEP | n8347.1 / AEPA0041a |
A sag study will be required on the 6.5 miles of ACSR ~ 397.5 ~ 30/7 ~ LARK ~ Conductor |
24 to 36 Months | $50,700 |
AF1-323, AF2-302, AG1-022, AG1-123, AG1-124, AG1-494 |
AE2-185, AE2-187, AE2-283, AG1-547 |
|||||
AEP | n8347.2 / AEP_AE1_REF_r0008 |
Replace 7.21 miles of ACSR ~ 397.5 ~ 30/7 ~ LARK, Conductor Section 1 |
24 to 36 Months | $12,675,000 |
AF1-323, AF2-302, AG1-022, AG1-123, AG1-124, AG1-494 |
AE2-185, AE2-187, AE2-283, AG1-547 |
|||||
AEP | n8395 / AEPO0043a |
Perform Sag Study on 10.2 miles of line with ACSR " 636 " 26/7 " GROSBEAK-Conductor to mitigate the overload. |
24 to 36 Months | $53,040 |
|
AF2-321, AG1-319, AG1-424 |
|||||
AEP | s2280 / S2280 |
Replace Rockport CB’s B, B2, C and C2 with 765kV SFMT 4000A Cb’s |
Jun 16 2023 | $0 |
|
AE2-130, AF1-088, AF2-008, AG1-522, AG1-523, AG1-524, AG1-525 |
|||||
AEP | s2832.1 / s2832 |
Replace (2) Clifty Creek 345 kV breakers |
Jun 07 2024 | $7,150,000 |
|
AE2-130, AE2-261, AF1-088, AF1-200, AF2-008, AF2-096, AG1-226, AG1-298, AG1-522, AG1-523, AG1-524, AG1-525 |
|||||
AEP | s2832.2 / AEPO0051a |
Replace E Lima Riser Sub Cond 1000 MCM CU |
Feb 28 2025 | $130,000 |
|
AG1-410, AG1-411 |
|||||
AEP | s2832.2 / AEPO0051b |
Replace three E Lima 138kV Riser Sub Cond 1590 AAC Str |
Feb 28 2025 | $390,000 |
|
AG1-410, AG1-411 |
|||||
AMIL | (Pending) |
AMIL limit is the line conductor between TWRL to Str1 on TWRL-PWRT-1404, 325MVA SE, 5.18 miles, need to rebuild to be 1600A/382 MVA. |
TBD | $10,000,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
AMIL | (Pending) / AMIL_TC1_13785 |
AMIL SE: 189 MVA. Rebuild 0.15 miles of 138 kV line between str 8 (Ameren) and CE tower on Edwards-Kewanee-7423 to be 1200 A, 286 MVA capable |
TBD | $1,000,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
AMIL | (Pending) / AMIL_TC1_15165 |
Replace Corbin Wave trap and switch to 3000 A capabile, update relay load limit to be above 3000 A, |
TBD | $250,000 |
AF1-318, AF2-069, AF2-070, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
AMIL | (Pending) / AMIL_TC1_15166 |
Replace Putnam Wave trap and switch to 3000 A capabile, update relay load limit to be above 3000 A, |
TBD | $250,000 |
AG1-121, AG1-435 |
|
|||||
AMIL | (Pending) / AMIL_TC1_15167 |
AMIL is 1793MVA, limited by switch and bus conductor at Snyder.in that case the mitigation is to build a second 345 kV line between Snyder (J1180 POI) and Sullivan, it is 5 miles long |
TBD | $15,000,000 |
AE1-172, AE2-130, AE2-223, AE2-261, AF1-088, AF1-296, AF1-318, AF2-182, AF2-225, AG1-005, AG1-121, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404, AG1-435, AG1-462, AG1-553 |
|
|||||
AMIL | (Pending) / AMIL_TC1_15168 |
Upgrade E Kewanee 138 kV bus conductor to be 3000A SE. (BT 105) |
TBD | $250,000 |
AF1-318, AF2-070, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
AMIL | (Pending) / AMIL__TC1_15169 |
AMIL limit is 1512 MVA 0.64 miles. (PWRT-TAZW-0304). Need to rebuild to be 4500 A/2688 MVA SE, upgrade TAZW 345 kV buses A and B, the leg that Powerton line is connected to to be 5000 A. |
TBD | $8,000,000 |
AF2-142, AF2-143, AF2-226, AF2-319, AG1-379 |
|
|||||
AMPT | (Pending) / AMPT |
Reinforcement of Sullivan 138kV ring bus and 138kV line terminals. |
24 to 36 Months | $4,750,000 |
AF2-209, AF2-321, AG1-319 |
AG1-424 |
|||||
APS | (Pending) / CE_NUN_STA7_TR82 |
Replace Exisiting Stateline Transformer 82 |
30 Months | $10,000,000 |
AF1-200, AG1-298, AG1-535 |
|
|||||
APS | (Pending) / TC1-PH1-004 |
Rebuild Back Fork - Crupperneck 138 kV Line and upgrade terminal ends |
40 to 42 Months | $56,608,948 |
AG1-194, AG1-219 |
|
|||||
APS | (Pending) / TC1-PH1-005 |
Bays - Wolf Run 138 kV line to be reconductored with 795 ACSR. Misc switcher to be replaced at Bays |
26 to 28 Months | $6,122,309 |
AG1-194 |
AG1-219 |
|||||
APS | (Pending) / TC1-PH1-006 |
Rebuild Page - Bethel 138 kV Line, terminal upgrades at page |
40 to 42 Months | $56,886,955 |
AG1-151, AG1-196 |
|
|||||
APS | (Pending) / TC1-PH1-007 |
Rebuild the Armstrong - Kittanning 138 kV Line and upgrade terminal ends. |
33 to 35 Months | $32,101,533 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-306, AF2-164, AG1-548 |
AF1-278, AF2-010, AG1-391, AG1-392 |
|||||
APS | (Pending) / TC1-PH1-008 |
Rebuild the Bethel - Riverton 138kV Line, Terminal Upgrades at Riverton |
28 to 30 Months | $11,614,746 |
AG1-151, AG1-196 |
|
|||||
APS | (Pending) / TC1-PH1-009 |
Terminal Upgrades at Pickens and Back Fork 138 kV |
25 to 27 Months | $584,775 |
AG1-194, AG1-219 |
|
|||||
APS | (Pending) / TC1-PH1-010 |
Reconductor Wolf Run - Sutton Tap 138 kV line |
26 to 28 Months | $5,704,879 |
AG1-194 |
AG1-219 |
|||||
APS | (Pending) / TC1-PH1-011 |
Reconductor Sutton Hill - Sutton Tap 138 kV, Terminal upgrades at Sutton Hill |
25 to 27 Months | $4,669,439 |
AG1-194 |
AG1-219 |
|||||
APS | (Pending) / TC1-PH1-040 |
Terminal Upgrades at Strasburg |
29 to 31 Months | $1,026,605 |
AG1-151, AG1-195, AG1-196, AG1-346 |
AG1-537 |
|||||
APS | (Pending) / TC1-PH1-050 |
Upgrade terminal equipment on the Shawville - Shingletown 230kV Line |
24 to 26 Months | $402,845 |
AF1-099, AF1-100, AF1-142, AF1-306, AF2-412, AG1-090 |
|
|||||
APS | (Pending) / TC1-PH1-062 |
Upgrade 345/138 kV #2 Transformer at Armstrong |
60 to 62 Months | $11,475,603 |
AF2-164, AF2-412 |
|
|||||
APS | (Pending) / TC1-PH1-066 |
Reconductor 4.83 miles of transmission line. Terminal Upgrades at Blairsville East and Social Hall substations. |
32 to 34 Months | $7,877,760 |
AG1-090 |
AF1-276, AF1-277, AF2-381 |
|||||
APS | (Pending) / TC1-PH1-072 |
Reconductor Potter - Two mile 115 kV Line. Terminal upgrades at Two Mile. |
33 to 35 Months | $39,019,441 |
AF2-412, AG1-389, AG1-390, AG1-391, AG1-392 |
|
|||||
APS | (Pending) / TC1-PH1-077 |
Reconductor Power Elm - Bays 138 kV Line |
29 to 31 Months | $15,723,202 |
AG1-194 |
AG1-219 |
|||||
APS | b3782 |
Adjust relay settings at Riverton substation on the Riverton-Bethel Tap 138 kV line (Projected ISD 6/1/2025) |
Jun 01 2025 | $78,000 |
|
AG1-151, AG1-196 |
|||||
APS | n6183 |
Reconductor 10.4 miles of 4/0 CU from Columbia Big Pine - Garretts Run Jct 138 kV (99 spans). |
28 to 30 Months | $38,879,028 |
AF1-100, AF1-142, AF2-164, AG1-548 |
AF1-099, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010 |
|||||
APS | n7165.1 |
Replace 4/0 CU line exit at All Dam 6 Tap. |
24 to 26 Months | $202,722 |
AF1-100, AF1-276, AF1-277, AF1-306, AF2-164, AG1-548 |
AF1-240, AF1-278, AF2-010 |
|||||
APS | n7165.2 |
Reconductor 6 miles of 4/0 CU from All Dam 6 Tap to Kittaning (49 spans). |
26 to 28 Months | $22,430,208 |
AF1-100, AF1-276, AF1-277, AF1-306, AF2-164, AG1-548 |
AF1-240, AF1-278, AF2-010 |
|||||
APS | n7166.1 |
Replace 4/0 CU line exit at All Dam 6 Tap. |
24 to 26 Months | $202,722 |
AF1-100, AF1-276, AF1-277, AF1-306, AF2-164, AG1-548 |
AF1-240, AF1-278, AF2-010 |
|||||
APS | n7166.2 |
Reconductor 7.6 miles of 4/0 CU from All Dam 6 Tap to structure 84 (66 spans) |
27 to 29 Months | $28,411,597 |
AF1-100, AF1-276, AF1-277, AF1-306, AF2-164, AG1-548 |
AF1-240, AF1-278, AF2-010 |
|||||
APS | n7171.1 |
Reconductor 3.7 miles of 4/0 CU on the Kiski Valley to Columbia Big Pine 138kV line. |
25 to 27 Months | $13,831,962 |
AF1-100, AF1-142, AF2-164, AG1-548 |
AF1-099, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010 |
|||||
APS | n7518 |
Reconductor approximately 3.33 miles of the Crupperneck-Nettie 138kV line |
25 to 27 Months | $16,027,878 |
AG1-194, AG1-219 |
|
|||||
APS | n7577 |
Replace 4/0 CU bus conductor at Ridgway substation. |
12 Months | $130,252 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306 |
|
|||||
APS | n7578 |
Replace 4/0 CW line riser at Ridgway substation. |
24 to 26 Months | $101,361 |
AF1-099, AF1-100, AF1-142, AF1-306 |
|
|||||
APS | n7579 |
Reconductor 8.89 miles of 4/0 CW (63 spans) on the Elko-Ridgway 138kV line. |
28 to 30 Months | $36,926,355 |
AF1-099, AF1-100, AF1-142, AF1-306 |
|
|||||
APS | s2987 |
Replace circuit breaker, wave trap, and relaying at Shawville. Replace limiting substation conductor and relaying at Moshannon. (Project is In-Service) |
TBD | $2,532,797 |
|
AF1-100, AF2-121, AG1-090, AG1-308, AG1-377, AG1-378 |
|||||
ATSI | (Pending) / TC1-PH1-036A |
Upgrade 4 Disconnects(D74, D92, D116, D93) at Beaver. |
31 to 33 Months | $2,422,258 |
AF2-321, AG1-199, AG1-319 |
|
|||||
ATSI | (Pending) / TC1-PH1-036B |
Update relays (5.8Amps) at Beaver |
23 to 25 Months | $861,365 |
AF2-321, AG1-199, AG1-319 |
|
|||||
ATSI | (Pending) / TC1-PH1-074 |
Reconductor the existing 3.25 miles of ATSI owned Lallendorf-Monroe 345kV line with bundled (2) 795 26/7 ACSS |
27 to 29 Months | $25,547,591 |
AF1-176, AF2-396, AG1-298 |
|
|||||
ATSI | (Pending) / TC1-PH1-079 |
Reconductor 17.1 miles of Napoleon – Stryker 138 kV line |
32 to 34 Months | $23,235,858 |
AF2-209, AF2-321 |
|
|||||
ATSI | (Pending) / TC1-PH1-080 |
Reconductor 1.5 miles of Ridgeville - AF2-321 TP 138 kV line with 795 ACSR conductor |
24 to 26 Months | $2,038,233 |
AF2-321, AG1-319 |
|
|||||
ATSI | (Pending) / TE-008A |
For the Davis Besse-Hayes 345 kV line, reconductor the substation conductor [...] line drop at Hayes 345 kV with 1590 ACSS bundled (2 conductors per phase). |
24 to 26 Months | $515,901 |
AF2-321, AG1-199, AG1-319 |
|
|||||
ATSI | (Pending) / TE-008B |
Reconductor the existing 30.3 miles of the Davis Besse-Hayes 345 kV line wi [...] 345 kV and at Hayes 345 kV with 1590 ACSS bundled (2 conductors per phase). |
38 to 40 Months | $121,181,726 |
AF2-321, AG1-199, AG1-319 |
|
|||||
ATSI | (Pending) / TE-AG1-F-0001 |
Reconductor (1) existing section of subconductor circular with a conductor about to meet or exceed 351 MVA STE. Replace (1)switcher at Lyons. |
32 to 34 Months | $748,531 |
AF2-321, AG1-319 |
|
|||||
ATSI | (Pending) / TE-AG1-F-0003a |
Reconductor section of 8.5 miles of transmission line from Richland to Ridgeville Tap to meet or exceed 286 MVA STE. |
48 Months | $21,352,000 |
AF2-321, AG1-319 |
|
|||||
ATSI | (Pending) / TE-AG1-F-0006a |
Reconductor (2) existing sections of subconductor circular with a conductor able to meet or exceed 359 MVA STE. |
26 to 28 Months | $515,902 |
AF2-321, AG1-319 |
|
|||||
ATSI | (Pending) / TE-AG1-F-0009 |
Reconductor approx. 17.6 miles of transmission line from Silica Tap to Lyons. Reconductor existing section of transmission line at Lyons. |
34 to 36 Months | $24,540,423 |
AF2-321, AG1-319 |
|
|||||
ATSI | (Pending) / TE-AG1-S-0003 |
Reconductor 11.2 miles of transmission line from Allen Junction to Jackman |
29 to 31 Months | $15,218,808 |
AG1-199 |
|
|||||
ATSI | (Pending) / TE-AG1-S-0014 |
Reconductor 19.4 miles of transmission line from Lemoyne to Majestic |
61 to 63 Months | $74,457,638 |
AF1-176, AF2-396 |
|
|||||
ATSI | n6186 |
Reconductor the existing Beaver-Lake Ave #2 345 kV line. Reconductor substation conductor, line drop and switches at both terminals. |
36 to 38 Months | $68,060,502 |
AF2-321, AG1-199, AG1-319 |
|
|||||
ATSI | n6486 / TE-010A |
For the Lakeview-Ottawa 138 kV line, reconductor the substation conductor a [...] rox 2.7 miles). Replace the wave trap at Lakeview 138 kV with a 2000A unit. |
27 to 29 Months | $15,423,112 |
AF2-321, AG1-199, AG1-319 |
|
|||||
ATSI | n7216 |
Reconductor roughly 13.58 miles of the Greenfield-Lakeview 138 kV Line. |
34 to 36 Months | $54,138,412 |
AF2-321, AG1-199, AG1-319 |
|
|||||
ATSI | n7546 |
Reconductor the Richland-Wauseon 138 kV line. |
Dec 31 2024 | $82,718,582 |
AF2-209, AF2-321, AG1-424 |
|
|||||
ATSI | n7547 |
Reconductor the line from Stryker 138 kV substation to the new 3 breaker ring for the AF2-321 gen queue project of the Richland-Stryker 138 kV line. |
Dec 31 2024 | $14,131,750 |
AF2-209, AF2-321, AG1-424 |
|
|||||
ATSI | n8394 / TE-AG1-S-0011 |
Reconductor 0.2 miles of (2) existing sections of transmission line at East Fayette |
24 to 26 Months | $787,666 |
AF2-321, AG1-319 |
|
|||||
ATSI | n8409 / TE-016A |
For the Napoleon Muni-Midway 138 kV Line, reconductor 10.2miles of 336 ACSR 30/7 of the transmission line with795kcmil 26/7 ACSS. |
31 to 33 Months | $23,956,853 |
AF2-209, AF2-321, AG1-319 |
AG1-424 |
|||||
BGE | b3780.4 |
Peach Bottom to Graceton (BGE Portion) – New 500kV Line |
Dec 31 2028 | $17,000,000 |
|
AF2-193, AF2-194, AG1-497 |
|||||
CPLE | (Pending) / DEP0004-1 |
Reconductor 4.86 miles Person-Hendrick with 6-795 ACSS-TW and replace 2000A switches at Person |
48 Months | $17,940,000 |
|
AE1-148, AE2-053, AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AF1-293, AF1-294, AF2-042, AF2-115, AF2-171, AF2-222, AF2-297, AF2-299, AF2-397, AF2-403, AG1-021, AG1-030, AG1-098, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-179, AG1-180, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-284, AG1-285, AG1-342, AG1-384, AG1-426, AG1-427, AG1-428, AG1-432, AG1-440, AG1-441, AG1-445, AG1-446, AG1-451, AG1-505, AG1-506, AG1-539, AG1-547 |
|||||
CPLE | (Pending) / dep0001 |
dep0001: Reconductor 8.5 miles RockyMt-Battleborro with single 795 ACSS-TW per phase, upgrade disconnect switches and CT ratios. |
36 Months | $31,000,000 |
|
AF2-046, AF2-080, AF2-299, AF2-324, AG1-008, AG1-082, AG1-083, AG1-106, AG1-343, AG1-394, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444, AG1-551, AG1-552 |
|||||
CPLE | (Pending) / dep0002 |
Reconductor 20 miles with single 795 ACSS-TW per phase, replace breaker, disconnect switches, wave trap, line switch |
48 Months | $60,000,000 |
|
AE1-148, AE2-053, AF1-294, AF2-042, AF2-115, AF2-171, AF2-222, AF2-297, AG1-021, AG1-030, AG1-098, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-179, AG1-180, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-342, AG1-384, AG1-427, AG1-428, AG1-432, AG1-440, AG1-441, AG1-445, AG1-446, AG1-451, AG1-505, AG1-506 |
|||||
CPLE | (Pending) / dep0003-1 |
Rebuild aging double circuit 230kV towers of Everets to Greenvile Line |
TBD | $19,000,000 |
|
AE2-147, AF1-152, AF1-266, AF2-046, AF2-047, AF2-080, AF2-081, AF2-299, AF2-324, AG1-008, AG1-082, AG1-083, AG1-106, AG1-179, AG1-180, AG1-343, AG1-394, AG1-428, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444, AG1-551, AG1-552 |
|||||
CPLE | (Pending) / dep0003-2 |
Reconductor one side of Everets to Greenvile 230 kV Line. |
30 to 36 Months | $350,000 |
|
AE2-147, AF1-152, AF1-266, AF2-046, AF2-047, AF2-080, AF2-081, AF2-299, AF2-324, AG1-008, AG1-082, AG1-083, AG1-106, AG1-179, AG1-180, AG1-343, AG1-394, AG1-428, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444, AG1-551, AG1-552 |
|||||
ComEd | (Pending) / CE_NUN_L0112.1 |
L0112 reconductor & station work. |
24 to 30 Months | $15,100,000 |
AF1-318, AF2-128, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L0626.1 |
L0626 reconductor & station terminal upgrades. |
30 to 36 Months | $54,000,000 |
AF1-280, AF2-182, AF2-349, AG1-119, AG1-423, AG1-553 |
|
|||||
ComEd | (Pending) / CE_NUN_L11124_3 |
Upgrade Disconnect Switches on Electric Junction - Lombard 345 kV |
24 Months | $3,000,000 |
AE2-341, AF1-200, AF1-280, AF2-041, AF2-182, AF2-200, AF2-349, AF2-392, AG1-118, AG1-119, AG1-423, AG1-434, AG1-462, AG1-553 |
|
|||||
ComEd | (Pending) / CE_NUN_L11212.1 |
Circuit Breaker Replacements at TSS 112 345KV Substation |
24 to 30 Months | $7,000,000 |
AE1-172, AE2-223, AF1-200, AF2-095, AF2-096, AF2-225, AG1-321, AG1-374, AG1-399, AG1-404 |
|
|||||
ComEd | (Pending) / CE_NUN_L11212.2 |
Wilton Relay Upgrade |
18 to 24 Months | $1,000,000 |
AE1-172, AE2-223, AF1-200, AF2-095, AF2-096, AF2-225, AG1-321, AG1-374, AG1-399, AG1-404 |
|
|||||
ComEd | (Pending) / CE_NUN_L11212.3 |
TSS 112 Station Conductor and L11212 Line Reconductor |
30 to 36 Months | $75,000,000 |
AE1-172, AE2-223, AF1-200, AF2-095, AF2-096, AF2-225, AG1-321, AG1-374, AG1-399, AG1-404 |
|
|||||
ComEd | (Pending) / CE_NUN_L11323.1 |
Reconductor W DEKALB ;3T 138 KV to ESS H452 ;RT 138 KV ckt 1 |
24 to 36 Months | $4,500,000 |
AE1-114, AE2-107, AF2-392, AF2-393 |
|
|||||
ComEd | (Pending) / CE_NUN_L11323_1 |
Reconductor ESS H452 - Waterman 138 kV Line |
30 to 36 Months | $5,400,000 |
AE1-114 |
|
|||||
ComEd | (Pending) / CE_NUN_L11620.1 |
Re-conductor a portion of the line and additional substation upgrades. |
30 to 36 Months | $36,000,000 |
AG1-321 |
|
|||||
ComEd | (Pending) / CE_NUN_L11622.1 |
Re-conductor a portion of the line, upgrade 1-345kV circuit breaker and station conductor at both terminals. |
30 to 36 Months | $36,000,000 |
AG1-321, AG1-379 |
|
|||||
ComEd | (Pending) / CE_NUN_L11622.2 |
Upgrade existing 345kV line conductor for L11622. Upgrade existing station conductor at both terminals. Upgrade at TSS 116 Goodings Grove, 1-345kV circuit breaker and line switch. |
30 Months | $60,200,000 |
AG1-321, AG1-379 |
|
|||||
ComEd | (Pending) / CE_NUN_L1202.1 |
Reconductor AB1-122 TAP2 345 KV to DRESDEN ; B 345 KV ckt 1 |
24 to 30 Months | $8,500,000 |
AF2-142, AF2-143, AG1-379 |
|
|||||
ComEd | (Pending) / CE_NUN_L1206 |
Reconductor L1206 138 kV |
24 to 30 Months | $5,400,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L1206.1 |
L1206 reconductor a portion of te line along with station conductor work. |
24 to 30 Months | $3,500,000 |
AF1-318, AF2-128, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L1206.2 |
L1206 sag mitigation on a portion of the line conductor. |
18 to 24 Months | $750,000 |
AF1-318, AF2-128, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L1404.2 |
Upgrade will require new line upgrade for 138kV L1404, station conductor upgrade |
24 Months | $14,400,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L15502.1 |
Station reconductor upgrades Nelson - AG1-343 345 kV line |
20 to 24 Months | $1,800,000 |
AE1-114, AF1-280, AF1-296, AF2-182, AF2-183, AF2-392, AG1-121, AG1-435, AG1-462, AG1-553 |
|
|||||
ComEd | (Pending) / CE_NUN_L15502.1 |
Station reconductor upgrades. |
20 to 24 Months | $1,800,000 |
AE1-114, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-183, AF2-199, AF2-200, AF2-201, AF2-349, AF2-392, AG1-119, AG1-121, AG1-371, AG1-423, AG1-434, AG1-435, AG1-462, AG1-553 |
|
|||||
ComEd | (Pending) / CE_NUN_L15502.2 |
L15502 reconductor and station upgrades |
24 to 36 Months | $85,500,000 |
AE1-114, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-183, AF2-199, AF2-200, AF2-201, AF2-349, AF2-392, AG1-119, AG1-121, AG1-371, AG1-423, AG1-434, AG1-435, AG1-462, AG1-553 |
|
|||||
ComEd | (Pending) / CE_NUN_L15518.1 |
Reconductor ROCK FALL;8T 138 KV to NELSON ; B 138 KV ckt 1 |
24 to 30 Months | $12,500,000 |
AF1-296, AF1-318, AF2-128, AF2-393, AF2-394, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L15518.1 |
Reconductor ROCK FALL; B 138 KV to ROCK FALL;8T 138 KV ckt Z1 |
24 to 30 Months | $1,100,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L15616.1 |
L15616 Line & terminal upgrades. |
28 to 36 Months | $72,000,000 |
AF1-280, AF2-182, AF2-349, AG1-119, AG1-423, AG1-553 |
|
|||||
ComEd | (Pending) / CE_NUN_L16914.1 |
Reconductor MCGIRR RD; 138 KV to ESS H447 ;RT 138 KV ckt 1 |
24 to 30 Months | $6,000,000 |
AE1-114, AF2-392, AF2-393 |
|
|||||
ComEd | (Pending) / CE_NUN_L17701.2 |
TSS 177 Burnham 345KV CB Upgrades. |
24 to 30 Months | $8,000,000 |
AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-392, AF2-441, AG1-121, AG1-298, AG1-434, AG1-435, AG1-553 |
|
|||||
ComEd | (Pending) / CE_NUN_L17703.3 |
L17703 & TSS 177 Burnham Upgrades |
30 to 36 Months | $26,500,000 |
AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-392, AF2-441, AG1-121, AG1-298, AG1-434, AG1-435, AG1-553 |
|
|||||
ComEd | (Pending) / CE_NUN_L18702.1 |
Reconductor L18702 138 kV line |
24 to 36 Months | $20,500,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L18806 |
L1 8806-Brokaw - AB2-070 - AC1-053 345 Kv Line - Mitigate Sag on the Line. |
24 Months | $5,000,000 |
|
AE2-261, AG1-236 |
|||||
ComEd | (Pending) / CE_NUN_L2105.1 |
Sag Mitigation L2105 345 kV line |
20 to 30 Months | $7,500,000 |
AE1-172, AF1-200, AF1-252, AF1-253, AF1-318, AG1-121, AG1-399, AG1-400, AG1-402, AG1-404, AG1-460 |
|
|||||
ComEd | (Pending) / CE_NUN_L6101.1 |
Reconductor L6101 138 kV line |
24 to 30 Months | $24,000,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L6101.3 |
L6101 reconductor. |
30 to 36 Months | $30,000,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L7404.1 |
Reconductor AG1-435 TP 138 KV to AG1-121 TP 138 KV ckt 1 |
24 to 30 Months | $35,500,000 |
AF1-318, AF2-128, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L7404.2 |
Reconductor AG1-121 TP 138 KV to 4PUTNAM 138 KV ckt 1 |
TBD | $31,500,000 |
AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L7411.1 |
Reconductor and CB Replacement L7411 138 kV line |
30 to 36 Months | $25,000,000 |
AF1-318, AF2-070, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L7413.1 |
Reinforcement for CRESCENT ; R 138 KV to KEWANEE ;11 138 KV ckt 1 |
28 to 36 Months | $16,000,000 |
AF1-318, AF2-069, AF2-070, AF2-128, AG1-005 |
|
|||||
ComEd | (Pending) / CE_NUN_L7413.A |
Reconductor TSS 981 CRESCENT ; R 138 KV to TSS 74 KEWANEE ;11 138 KV ckt 1 |
TBD | $40,500,000 |
AF1-318, AF2-069, AF2-070, AF2-128, AG1-005 |
|
|||||
ComEd | (Pending) / CE_NUN_L7413.B |
Line trap and station conductor upgrades CRESCENT ; R 138 KV to AF1-318 TP 138 KV ckt 1 |
20 to 28 Months | $1,500,000 |
AF1-318, AF2-070, AF2-128, AG1-121, AG1-435 |
AF2-069 |
|||||
ComEd | (Pending) / CE_NUN_L7713.3 |
Reconductor AF2-128 TP 138 KV to 4CORBIN 138 KV ckt 1 |
30 to 36 Months | $16,200,000 |
AF1-318, AF2-069, AF2-070, AF2-128 |
|
|||||
ComEd | (Pending) / CE_NUN_L7713.4 |
Upgrade for 4CORBIN 138 KV to AD2-066 TP 138 KV ckt 1 |
24 to 30 Months | $1,000,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / CE_NUN_L8002.1 |
L8002- Station upgrades. |
24 to 30 Months | $12,500,000 |
AE2-223, AE2-261, AF2-225, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|
|||||
ComEd | (Pending) / CE_NUN_L8002.2 |
L8002 reconductor & station upgrades. |
24 to 30 Months | $63,800,000 |
AE2-223, AE2-261, AF2-225, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|
|||||
ComEd | (Pending) / CE_NUN_L8014.1 |
Sag Mitigation and upgrades AG1-321 TP 345 KV to DRESDEN ; R 345 KV ckt 1 |
24 to 30 Months | $21,500,000 |
AE1-172, AE2-223, AG1-298, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|
|||||
ComEd | (Pending) / CE_NUN_L8104.2 |
Reconductor and switch upgrade PONTIAC ; R 345 KV to AG1-321 TP 345 KV to DRESDEN ; R 345 KV ckt 1 |
30 to 36 Months | $53,200,000 |
AE1-172, AE2-223, AG1-298, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|
|||||
ComEd | (Pending) / CE_NUN_L9515.1 |
Sag MItigation L9515 345 kV line |
24 to 30 Months | $10,000,000 |
AE2-223, AE2-261, AF2-225, AG1-399, AG1-400, AG1-402, AG1-404 |
|
|||||
ComEd | (Pending) / CE_NUN_L9806.1 |
Sag Mitigation and Reconductor L9806 345 kV line |
24 to 36 Months | $30,000,000 |
AF2-142, AF2-143, AG1-121, AG1-379 |
|
|||||
ComEd | (Pending) / CE_NUN_STA12_NEW BT CB |
Installation of a new 345KV Bus Tie Circuit Breaker (BT CB) at the Dresden Station 12 345KV Red Bus. |
60 Months | $4,500,000 |
|
AE1-172, AE2-223, AE2-261, AF1-088, AF2-008, AF2-225, AG1-321, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|||||
ComEd | (Pending) / CE_NUN_TSS 111 BT 3-4.1 |
Station conductor and switch upgrades at TSS 111 Electric Junction |
24 to 28 Months | $3,800,000 |
AF1-200, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-200, AF2-201, AF2-349, AF2-392, AG1-118, AG1-119, AG1-423, AG1-434, AG1-462, AG1-553 |
|
|||||
ComEd | (Pending) / CE_NUN_TSS 112_1 |
TSS 112 Wilton Center upgrades. |
24 to 36 Months | $7,500,000 |
AE1-172, AE2-223, AE2-261, AF1-088, AF2-008, AF2-225, AF2-441, AG1-298, AG1-321, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|
|||||
ComEd | (Pending) / NUN6101 |
Sag Mitigation on 4PUTNAM 138 KV to AC1-168 TP 138 KV ckt 1 |
24 to 30 Months | $6,500,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | (Pending) / NUN_L10805_1 |
Reconductor KENDALL ;BU 345.0 - LOCKPORT ; B 345.0 ckt 1 |
30 Months | $42,500,000 |
AG1-379 |
|
|||||
ComEd | b3677 / (Pending) |
Mazon - Lasalle 138 kV line rebuild |
Jun 01 2025 | $42,060,000 |
|
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|||||
ComEd | b3775.1 |
Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line |
Dec 01 2026 | $0 |
|
AE1-070, AF1-200, AF1-296, AF1-318, AF2-041, AF2-182, AF2-349, AF2-392, AG1-118, AG1-119, AG1-121, AG1-298, AG1-321, AG1-379, AG1-435, AG1-436, AG1-553 |
|||||
ComEd | b3775.3 |
Rebuild ComEd’s section of 345 kV double circuit in IL from St. John to Crete |
Dec 01 2026 | $0 |
|
AE1-070, AE1-172, AF1-200, AF1-296, AF1-318, AF2-041, AF2-182, AF2-349, AF2-392, AG1-118, AG1-119, AG1-121, AG1-298, AG1-379, AG1-435, AG1-553 |
|||||
ComEd | b3775.4 |
Rebuild 345 kV double circuit extending from Crete to E. Frankfort. |
Dec 01 2026 | $0 |
|
AE1-070, AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-041, AF2-349, AF2-392, AG1-118, AG1-119, AG1-121, AG1-298, AG1-379, AG1-423, AG1-434, AG1-435, AG1-553 |
|||||
ComEd | b3775.5 |
Replace E. Frankfort 345 kV circuit breaker “9-14” with 3150A SF6 circuit breaker. |
Dec 01 2026 | $0 |
|
AE1-070, AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-041, AF2-349, AF2-392, AG1-118, AG1-119, AG1-121, AG1-298, AG1-379, AG1-423, AG1-434, AG1-435, AG1-553 |
|||||
ComEd | b3811.1 / CE_PJM B3811_L11323 |
Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus. |
Dec 01 2028 | $15,910,000 |
|
AE1-114, AE2-107, AF2-392 |
|||||
ComEd | b3811.2 / CE_PJM B3811_L11323 |
Additional Circuit Breaker at ESS H452 |
Dec 01 2028 | $1,980,000 |
|
AE1-114, AE2-107, AF2-392 |
|||||
ComEd | b3811.3 / CE_PJM B3811_L11323 |
Rebuild 3 miles of 138 kV line 11323 from Haumesser Road to the H-452 tap |
Dec 01 2028 | $10,200,000 |
|
AE1-114, AE2-107, AF2-392 |
|||||
ComEd | n3515.1 / ce-017 |
Cherry Valley - Garden Prarie 345 kV line - reconductoring and sag mitigation. |
30 Months | $19,400,000 |
|
AF1-280, AF2-182, AG1-119, AG1-553 |
|||||
ComEd | n3515.2 / (Pending) |
Cherry Valley - Garden Prarie 345 kV Line Circuit Breaker Replacement |
TBD | $3,000,000 |
AF1-280, AF2-182, AG1-119, AG1-423, AG1-553 |
|
|||||
ComEd | n3515.3 |
13.8 miles of rebuild plus 1 CB, station conductor, and relays at Cherry Valley |
TBD | $88,000,000 |
AF1-280, AF2-182, AG1-119, AG1-423, AG1-553 |
|
|||||
ComEd | n5145 |
Reconfigure Wilton 765kV bus |
Dec 01 2026 | $55,229,373 |
|
AF2-142, AF2-441, AG1-298 |
|||||
ComEd | n5318.1 / ce-012a |
Garden Prarie - Silver Lake R 345 kV Line - Reconductor and Station Bus Work |
30 Months | $45,700,000 |
|
AF1-280, AF2-182, AF2-349, AG1-119, AG1-553 |
|||||
ComEd | n5318.2 / ce-012 |
Reconductor 26.7 miles of 2338 kcmil. Mitigate sag limits. Upgrade relay package. Replace station conductor at both line terminals. Replace 2-345 kV breakers and CT's at TSS 138 Silver Lake. |
36 Months | $170,000,000 |
AF1-280, AF2-182, AF2-349, AG1-119, AG1-423, AG1-553 |
|
|||||
ComEd | n5912 / N5912 |
Re-conductor of the line along with station conductor upgrade at Burnham |
30 Months | $1,000,000 |
AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-392, AF2-441, AG1-121, AG1-298, AG1-434, AG1-435, AG1-553 |
|
|||||
ComEd | n5912.1 / (Pending) |
Replace station conductor, line reconductor and upgrade CBs. |
Dec 31 2024 | $18,000,000 |
AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-392, AF2-441, AG1-121, AG1-298, AG1-434, AG1-435, AG1-553 |
|
|||||
ComEd | n5912.2 / CE_NUN_17703.1 |
L17701 Overhead line reconductor and TSS 177 Burnham station consductor upgrades. |
30 to 36 Months | $18,000,000 |
AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-392, AF2-441, AG1-121, AG1-298, AG1-434, AG1-435, AG1-553 |
|
|||||
ComEd | n5912.3 / N5912.3 |
Reconductor Munster - Burnham 345 kV line and replace the 345kV BT 10-11 & BT 9-10 CB disconnect switches at TSS 177 |
30 Months | $18,400,000 |
AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-392, AF2-441, AG1-121, AG1-298, AG1-434, AG1-435, AG1-553 |
|
|||||
ComEd | n5919 / CE_NUN_L93505.1 |
Sag Mitigation for DRESDEN ; B 345 KV to KENDALL ;BU 345 KV ckt 1 |
24 to 30 Months | $10,500,000 |
AF1-318, AG1-005, AG1-379 |
|
|||||
ComEd | n6260.1 / CE_NUN_8012 |
Upgrade of TSS 80 Pontiac 345kV circuit breaker BT 4-5 and 345kV station and bus conductor |
24 Months | $4,000,000 |
|
AE2-261, AF1-088, AF2-008, AF2-225, AG1-298, AG1-321, AG1-374, AG1-400, AG1-402, AG1-404 |
|||||
ComEd | n6260.2 / N6260.2 |
Replace a line disconnect switch to upgrade the Pontiac - Loretto 345 kV line. |
24 Months | $500,000 |
AE2-223, AE2-261, AF1-088, AF2-008, AF2-225, AF2-441, AG1-298, AG1-321, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|
|||||
ComEd | n6260.3 / CE_NUN_L8012_1 |
Station upgrade and line re-conductoring Loretto - Pontiac 345 kV line |
Dec 31 2024 | $61,500,000 |
AE2-223, AE2-261, AF1-088, AF2-008, AF2-225, AF2-441, AG1-298, AG1-321, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|
|||||
ComEd | n6261.1 / CE_NUN_8014_1 |
Mitigate Sag on the Pontiac - AD1-133 Tap 345 kV Line |
Dec 31 2025 | $12,300,000 |
|
AE1-172, AE2-223, AG1-298, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|||||
ComEd | n6262 / CE_NUN_L2002_1 |
Re-conductor the 345kV line, upgrade station conductor at line terminals and upgrade 2-345kV CB’s at Station 20 Braidwood |
24 to 30 Months | $52,400,000 |
AF1-200, AF2-041, AF2-096, AF2-182, AF2-349, AG1-118, AG1-119 |
|
|||||
ComEd | n6270 / CE_NUN_L0321 |
Disconnect Switch Upgrade on Toulon - Powerton 138 kV line |
24 Months | $600,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | n6279 / CE_NUN_116BT3-4 |
TSS 116 Replace 345 kV Circuit Breaker |
24 Months | $3,200,000 |
AF2-041, AF2-182, AF2-349, AG1-119, AG1-121, AG1-379, AG1-462, AG1-553 |
AE2-107, AE2-341, AF1-030, AF1-200, AF1-318, AF2-128, AF2-329, AG1-005, AG1-118 |
|||||
ComEd | n6280 / ce-005 |
Mitigate the sag on the ComEd Powerton - Tazewell L0304 345 kV line. |
Nov 01 2026 | $2,470,796 |
|
AF2-142, AF2-143, AG1-379 |
|||||
ComEd | n6563 / ce-019 |
Reconductor and terminal upgrades at Wilton Center. |
36 Months | $43,200,000 |
AE1-172, AE2-223, AF1-200, AF2-095, AF2-096, AF2-225, AG1-321, AG1-374, AG1-399, AG1-404 |
|
|||||
ComEd | n6639 / CE_NUN_15502 |
Re-conductor ComEd L15502 345 kV Line and station work. |
30 Months | $72,500,000 |
AE1-114, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-183, AF2-199, AF2-200, AF2-201, AF2-349, AF2-392, AG1-119, AG1-121, AG1-371, AG1-423, AG1-434, AG1-435, AG1-462, AG1-553 |
|
|||||
ComEd | n6639.1 / CE_NUN_L15502_3 |
Replace station conductor at TSS111 EJ, replace MOD. Relay upgrades, re-conductor part of the line. |
36 Months | $22,300,000 |
AE1-114, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-183, AF2-199, AF2-200, AF2-201, AF2-349, AF2-392, AG1-119, AG1-121, AG1-371, AG1-423, AG1-434, AG1-435, AG1-462, AG1-553 |
|
|||||
ComEd | n6639.2 / CE_NUN_L15502_4 |
Electric Junction 345kV line reconductor, upgrade 1-34kV Circuit Breaker (CB) & associated motor operated disconnect switches, replace station conductor at both terminals. |
36 to 42 Months | $140,300,000 |
AE1-114, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-183, AF2-199, AF2-200, AF2-201, AF2-349, AF2-392, AG1-119, AG1-121, AG1-371, AG1-423, AG1-434, AG1-435, AG1-462, AG1-553 |
|
|||||
ComEd | n6752 / CE_NUN_1404 |
Powerton 138 KV Reconductoring |
24 to 30 Months | $4,600,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | n6840 / CE_NUN_Sta. 12 Dresden |
Install a new 345kV bus tie circuit breaker at Station 12 Dresden |
Nov 24 2026 | $3,444,645 |
|
AE1-172, AE2-261, AF2-225, AG1-321, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|||||
ComEd | n6991 / CE_NUN_L7713_4 |
AF1-318 - Corbin 138 kV line Reconductoring |
30 to 36 Months | $15,100,000 |
AF1-318, AF2-069, AF2-070, AG1-121, AG1-435 |
|
|||||
ComEd | n6992 / CE_NUN_L7713_2 |
Re-conductor a portion of the AF2-128 Tap - Corbin 138 kV line |
30 to 36 Months | $12,500,000 |
AF1-318, AF2-069, AF2-070, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | n6993 / CE_NUN_L7413 |
Kewanee L7413 re-conductor a portion of the line, upgrade a disconnect switch and line trap, upgrade station conductor |
24 to 30 Months | $9,100,000 |
AF1-318, AF2-069, AF2-070, AF2-128, AG1-005 |
|
|||||
ComEd | n7023.1 / CE_NUN_L11124.1 |
Reconductor Electric Junction - Lombard L11124 345 kV Line, station condctor work and 345KV CB replacement. |
30 to 36 Months | $46,500,000 |
AE2-341, AF1-200, AF1-280, AF2-041, AF2-182, AF2-200, AF2-349, AF2-392, AG1-118, AG1-119, AG1-423, AG1-434, AG1-462, AG1-553 |
|
|||||
ComEd | n7023.2 / CE_NUN_L11124_2 |
Replace 2-345 kV CB and Station conductor - Electric Junction - Lombard L11124 345 kV Line |
30 Months | $7,000,000 |
AE2-341, AF1-200, AF1-280, AF2-041, AF2-182, AF2-200, AF2-349, AF2-392, AG1-118, AG1-119, AG1-423, AG1-434, AG1-462, AG1-553 |
|
|||||
ComEd | n7093 / CE_NUN_L7713 |
4Corbin-AD2-066 138 kV Line - Mitigate Sag and Reconductor |
24 Months | $22,400,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | n7094.1 / CE_NUN_L7713_3 |
Perform sag mitigation on AF1-318 - Crescent 138 kV line |
30 Months | $5,600,000 |
AF1-318, AF2-070, AF2-128, AG1-005, AG1-121, AG1-435 |
AF2-069 |
|||||
ComEd | n7094.2 / CE_NUN_L7713.4 |
Reconductor Line - AF1-318 Tap - Crescent 138 kV Line |
Aug 26 2024 | $16,700,000 |
AF1-318, AF2-070, AF2-128, AG1-121, AG1-435 |
AF2-069 |
|||||
ComEd | n7207 / CE_NUN_L11212_3 |
TSS 112 & L11212-replace-4-345kV circuit breakers, upgrade a line relay scheme, station conductor upgrades at both terminals |
Dec 31 2025 | $80,000,000 |
|
AG1-404 |
|||||
ComEd | n7941 / CE_NUN_8001 |
Pontiac - Z2-087 (McLean) Sag Mitigation |
30 Months | $10,500,000 |
|
AE2-223, AE2-261, AF2-225, AG1-298, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|||||
ComEd | n7941.1 / CE_NUN_8001_1 |
Pontiac Line Reconductor and Station Work |
24 to 36 Months | $26,000,000 |
AE2-223, AE2-261, AF2-225, AG1-298, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|
|||||
ComEd | n7945 / CE_NUN_L7713.1 |
Channahon - Mazon 138 kV line conductor and circuit breaker upgrades |
30 to 36 Months | $17,500,000 |
|
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|||||
ComEd | n8091 / CE_NUN_L8002 |
The upgrade will be to mitigate sag on the line, upgrade station conductor at both terminals and upgrade two 345 kV CBs at Pontiac. |
24 to 30 Months | $21,800,000 |
|
AE2-223, AE2-261, AF2-225, AG1-374, AG1-399, AG1-400, AG1-402, AG1-404 |
|||||
ComEd | n8162 / CE_NUN_0304.1 |
Powerton - Tazewell 345 kV Line Sag Mitigation and Disconnect Switch Replacement |
30 Months | $12,500,000 |
AF2-142, AF2-143, AF2-226, AF2-319, AG1-379 |
|
|||||
ComEd | n8348 / CE_NUN_17121_1 |
ComEd L17121 138 kV line reconductor |
30 Months | $16,500,000 |
AE1-114, AF1-314, AF2-201 |
|
|||||
ComEd | n8349 / CE_NUN_17121 |
ComEd L17121 138 kV line reconductor |
24 Months | $6,400,000 |
AE1-114, AF1-314, AF2-201 |
|
|||||
ComEd | n8350 / CE_NUN_L11904_1 |
Freeport - Lancaster 138 kV - Mitigate Sag and upgrade station conductor |
24 Months | $750,000 |
AE1-114, AF1-314, AF2-201 |
|
|||||
ComEd | n8377 / CE_NUN_L0321_1 |
Powerton - Toulon 138 kV line Reconductor and upgrades |
36 to 40 Months | $82,000,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | n8388 / CE_NUN_L14304 |
L14304 Montgomery - Oswego section- Reconductor |
30 to 36 Months | $5,000,000 |
AE2-107, AE2-341, AF1-030, AF2-329, AG1-118, AG1-120, AG1-127 |
|
|||||
ComEd | n8389 / CE_NUN_116BT3-4_1 |
TSS 116 Replace Station Conductor |
24 Months | $1,000,000 |
AF2-041, AF2-182, AF2-349, AG1-119, AG1-121, AG1-379, AG1-462, AG1-553 |
AE2-107, AE2-341, AF1-030, AF1-200, AF1-318, AF2-128, AF2-329, AG1-005, AG1-118 |
|||||
ComEd | n8399 / CE_NUN_L7411 |
Kewanee - 4 Kemin 138 kV line Mitigate Sag |
30 Months | $2,800,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
AF2-070, AF2-393, AF2-394 |
|||||
ComEd | n8400 / CE_NUN_L7423 |
Mitigate Sag Kewanee - AD1-031 - Edwards 138 kV line |
36 Months | $20,800,000 |
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|
|||||
ComEd | n8400.1 / CE_NUN_L6101 |
Re-conductor the line - Kewanee - AG1-435 138 kV line |
30 Months | $7,800,000 |
AF1-318, AF2-128, AG1-121, AG1-435 |
|
|||||
ComEd | n8401 / CE_NUN_L6101_1 |
Re-conductor the line, upgrade a line trap and install new station bus at TSS 74 Kewanee. |
36 Months | $16,500,000 |
AF1-318, AF2-128, AG1-121, AG1-435 |
|
|||||
ComEd | n8403 / CE_NUN_L112XX_NEW LINE |
Construct a new 345kV line from TSS 93 Loretto to TSS 905 Essex (AD1-100 Interconnection Substation) |
72 to 120 Months | $127,000,000 |
|
AE1-172, AE2-261, AF1-088, AF2-008, AF2-225, AG1-298, AG1-321, AG1-374, AG1-400, AG1-402, AG1-404 |
|||||
ComEd | n8408 / CE_NUN_L6608 |
Re-conductor E Frankfort - University Park North 345 kV line |
30 Months | $5,500,000 |
AE1-172, AF1-200, AF1-314, AF1-318, AF2-441, AG1-121, AG1-298, AG1-434 |
|
|||||
ComEd | n8414 / CE_NUN_11119.1 |
Electric Junction - Aurora 345 kV line - Re-conductor the line and upgrade station conductor |
30 to 36 Months | $7,500,000 |
AE1-114, AE2-321, AF1-200, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-200, AF2-201, AF2-349, AF2-392, AG1-118, AG1-119, AG1-120, AG1-423, AG1-434, AG1-462, AG1-553 |
|
|||||
ComEd | n8414.1 / CE_NUN_11119 |
Replacement of motor operated 345kV disconnect switches on L11119 at TSS 111 Electric Junction along with a new 345kV Circuit Breaker. |
30 Months | $7,200,000 |
AE1-114, AE2-321, AF1-200, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-200, AF2-201, AF2-349, AF2-392, AG1-118, AG1-119, AG1-120, AG1-423, AG1-434, AG1-462, AG1-553 |
|
|||||
ComEd | n8428 / CE_NUN_L14419_1 |
Reconductor the Auora EC - ESS W407K 345 kV Line. |
30 Months | $1,100,000 |
AE1-114, AE2-321, AF1-200, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-200, AF2-201, AF2-349, AF2-392, AG1-118, AG1-119, AG1-120, AG1-423, AG1-434, AG1-462, AG1-553 |
|
|||||
ComEd | n8429 / CE_NUN_L14419_4 |
Reconductor ESS W407K - ESS W407M 345 kV line |
30 Months | $3,300,000 |
AE1-114, AE2-321, AF1-200, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-200, AF2-201, AF2-349, AF2-392, AG1-118, AG1-119, AG1-120, AG1-423, AG1-434, AG1-462, AG1-553 |
|
|||||
ComEd | n8430 / CE_NUN_L14419_2 |
Reconductor ESS W407M - Wayne 345 kV line |
30 Months | $3,300,000 |
AE1-114, AE2-321, AF1-200, AF1-280, AF1-296, AF1-314, AF2-041, AF2-182, AF2-200, AF2-201, AF2-349, AF2-392, AG1-118, AG1-119, AG1-120, AG1-423, AG1-434, AG1-462, AG1-553 |
|
|||||
ComEd | n8440 / CE-NUN_L17705 |
Reconductor Sheffield - Burnham 345 kV line and Upgrade CB |
TBD | $24,000,000 |
AE1-172, AF1-200, AF1-314, AF1-318, AG1-121 |
|
|||||
ComEd | s2768 / (Pending) |
Mazon Circuit Breaker Replacement |
Dec 31 2024 | $2,500,000 |
|
AF1-318, AF2-128, AG1-005, AG1-121, AG1-435 |
|||||
DEI | (Pending) / DEI_TC1_13416 |
MISO end upgrade: Mitigation would be add a new 345kV Circuit in Parallel of existing 345kV line from Cayuga to Eugene. AEP SE rating is 1868 MVA . |
TBD | $12,095,000 |
|
AE2-261, AF1-088, AF1-200, AF1-204, AF1-318, AF2-008, AF2-407, AG1-226, AG1-297, AG1-399, AG1-522, AG1-523, AG1-524, AG1-525 |
|||||
DEOK | (Pending) / M220257 |
Rebuild 13 mile DEOK portion of College Corner-Collinsville line with new structures and 954ACSS/TW Cardinal, 200C |
54 to 60 Months | $56,364,644 |
AF1-221, AF2-068 |
|
|||||
DEOK | (Pending) / M24004501 |
Rebuild the 1.4 mile long feeder from McGuffey to Locust. |
36 to 39 Months | $5,315,554 |
AF1-221 |
|
|||||
DEOK | (Pending) / M24004503 |
Replace Switch 193, Line scope and Switch scope |
36 to 39 Months | $1,106,840 |
AF1-221 |
|
|||||
DEOK | (Pending) / M24004504 |
Replace Switch 363, Line Scope and Switch Scope |
36 to 39 Months | $1,106,840 |
AF1-221 |
|
|||||
DEOK | (Pending) / M240135 |
Rebuild 1.25 mile DEOK portion of Longbranch-Mt. Zion with new structures and 954ACSS/TW, 200C |
30 to 36 Months | $4,803,522 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-526 |
AG1-306 |
|||||
DEOK | (Pending) / M240136 |
Replace Mt. Zion ABS880 |
30 to 36 Months | $141,814 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-526 |
AG1-306 |
|||||
DEOK | (Pending) / M240137 |
Rebuild 2.25 mile Mt. Zion-Buffingtong line with new structures and 954ACSS/TW, 200C. |
30 to 36 Months | $8,566,326 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-526 |
AG1-306 |
|||||
DEOK | (Pending) / M240138 |
Replace Mt. Zion ABS882 |
30 to 36 Months | $229,120 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-526 |
AG1-306 |
|||||
DPL | (Pending) / 13747 Line |
Rebuild Indian River 138kV UG line |
55 to 65 Months | $12,850,000 |
AF2-193, AF2-194 |
|
|||||
DPL | (Pending) / 6704-2 Kent |
Upgrade disconnect switch at Kent Substation |
24 to 30 Months | $200,000 |
AF2-193, AF2-194, AG1-061, AG1-529 |
|
|||||
DPL | (Pending) / 6708-2 |
Rebuild Mardela - Hebron 69kV line |
55 to 65 Months | $8,080,000 |
AF2-358, AG1-061, AG1-450 |
|
|||||
DPL | (Pending) / 6716-6 |
Reconductor Preston - Todd line & Terminal Upgrades at Todd |
55 to 65 Months | $25,080,000 |
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450, AG1-529 |
|
|||||
DPL | b2946 |
PJM baseline upgrade b2946 conversion of Preston station to a Ring Bus |
May 31 2025 | $6,000,000 |
|
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450, AG1-529 |
|||||
DPL | b3669.1 |
Reinforcement baseline project for CHURCH 138 KV to TOWNSEND 138 KV ckt 1 |
Dec 01 2026 | $1,000,000 |
|
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450, AG1-497, AG1-529 |
|||||
DPL | b3669.2 |
Reinforcement baseline project for CHURCH 138 KV to TOWNSEND 138 KV ckt 1 |
Dec 01 2026 | $450,000 |
|
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450, AG1-497, AG1-529 |
|||||
DPL | n7038 / dt13703r0001 |
Rebuild Indian River to Nelson 138 kV circuit. |
Oct 31 2026 | $85,560,000 |
AF2-358, AG1-061 |
AG1-450 |
|||||
DPL | n7040 / dt6716r0003 |
Rebuild Tanyard - Talbot 69 kV line. |
Oct 30 2026 | $7,499,000 |
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450 |
AG1-529 |
|||||
DPL | n7041 / ds6716r0003 |
Replace terminal equipment at the Tanyard and Talbot taps. |
12 to 18 Months | $400,000 |
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450 |
AG1-529 |
|||||
DPL | n7047 / dt6716r0004 |
Reconductor the (DPL) Trappe Tap - Trappe Tap Alt 69 kV line and replace disconnect switches. |
55 to 65 Months | $400,000 |
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450 |
AG1-529 |
|||||
DPL | n7104 / dt23034r0001 |
Reconductor the Indian River - Milford 230 kV line with HTLS conductor. In addition terminal upgrades will be required at Milford and Indian River |
Oct 31 2026 | $106,500,000 |
AF2-193, AF2-194, AF2-358, AG1-061 |
|
|||||
DPL | n7105 / dt6716r0001 |
Reconductor the (DP&L) Preston - Tanyard 69 kV line. |
Oct 31 2026 | $18,400,000 |
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450 |
AG1-529 |
|||||
DPL | n7106 / ds6716r0006 |
Upgrade disconnect at Tanyard. |
24 to 30 Months | $200,000 |
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450 |
AG1-529 |
|||||
DPL | n7146 / ds13780r0001 |
Upgrade terminal equipment at Vienna Substation. |
Oct 31 2026 | $125,000 |
AF2-193, AF2-194 |
|
|||||
DPL | n7749 / dt6716r0008 |
Rebuild line and replace disconnect switch. |
55 to 65 Months | $4,750,000 |
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450 |
AG1-529 |
|||||
DPL | n7799 / dt23045r0001 |
Rebuild 23045 Red Lion - Silver Run line & terminal upgrades |
55 to 65 Months | $53,755,000 |
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450, AG1-497, AG1-529 |
|
|||||
Dayton | n5780 / DAYr190039 |
Reconductor Stuart-Spurlock line with twin bundle 1033 Curlew ACCR conductor. |
18 to 36 Months | $25,000,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-306, AG1-526 |
|
|||||
Dayton | n5780.1 / DAYr190040 |
Replace Stuart substation riser conductor with 2500AAC (parallel) |
12 to 18 Months | $300,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-306, AG1-526 |
|
|||||
Dayton | n5780.2 / DAYr190041 |
Reconductor Stuart substation conductor with twin bundle 1033 Curlew ACCR conductor Reconductor Stuart Substation conductor with a bundled 795 hi-temperature conductor. |
18 to 24 Months | $650,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-306, AG1-526 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-001 |
Wreck and rebuild 1.45 miles of 69 kV line 35 between AltaVista and Gladys Tap |
30 to 36 Months | $3,045,000 |
AE2-185, AE2-187, AE2-283, AF2-403, AG1-547 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-002 |
Replace Wave Trap at Altavista 69 kV for increased rating on 2ALTVSTA 69.0 - 2GLADYS TAP 69.0 ckt 1 |
16 to 18 Months | $150,000 |
AE2-185, AE2-187, AE2-283, AF2-403, AG1-547 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-003 |
Wreck and rebuild 0.1 miles of 115 kV line between Boydton Plank and Boydton Tap |
30 to 36 Months | $210,000 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-342, AG1-384, AG1-427, AG1-428, AG1-432, AG1-451 |
AG1-179 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-004 |
Wreck and rebuild 1.44 miles of 115 kV line 5 between Bremo and Fork Union |
30 to 36 Months | $3,024,000 |
AF1-323, AF2-302, AG1-022, AG1-123, AG1-124, AG1-494 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-005 |
Wreck and rebuild 10.51 miles of 115 kV line 171 between Chase City and Herbert |
36 to 40 Months | $25,381,650 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-342, AG1-384, AG1-427, AG1-428, AG1-432, AG1-451 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-006 |
Add third 115/230 kV Transformer at Cloud substation |
42 to 44 Months | $6,500,000 |
AE1-148, AF1-294, AF2-171, AF2-222, AG1-030, AG1-105, AG1-181, AG1-185, AG1-285, AG1-427, AG1-432, AG1-440, AG1-441 |
AE2-053, AF2-115, AG1-021, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-179, AG1-272, AG1-273, AG1-274, AG1-342, AG1-384, AG1-428, AG1-445, AG1-446, AG1-451 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-007 |
Wreck and rebuild 2.94 miles of 115 kV line between Franklin and Union Camp / additional station upgrades |
30 to 36 Months | $6,394,000 |
AF2-046, AG1-008, AG1-343, AG1-394 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-008 |
Wreck and rebuild 0.11 miles of 115 kV line 65 between Garner DP and Moon Corner |
30 to 36 Months | $231,000 |
AG1-135, AG1-146, AG1-147 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-009 |
Wreck and rebuild 3.90 miles of 115 kV line between Grit Tap and Otter River |
30 to 36 Months | $9,418,500 |
AE1-148, AE2-291, AE2-292, AF2-042, AF2-171, AF2-222, AF2-297, AG1-030, AG1-098, AG1-105, AG1-181, AG1-285, AG1-342, AG1-427, AG1-432, AG1-440, AG1-441, AG1-505, AG1-506, AG1-539 |
AG1-185 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-010 |
Wreck and rebuild 0.86 miles of 115 kV line between Hathaway and Battleboro |
30 to 36 Months | $1,806,000 |
AF2-080, AF2-324, AG1-439, AG1-444 |
AG1-106 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-011 |
Wreck and Rebuild 1.05 miles of 115 kV line between Pine Glade and Locust Grove |
30 to 36 Months | $2,205,000 |
AF1-301, AG1-538 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-012 |
Wreck and rebuild 12.3 miles of 69 kV line 35 between Stonemill and Gladys Tap |
36 to 40 Months | $25,830,000 |
AE2-185, AE2-283 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-013 |
Wreck and rebuild 5.63 miles of 115 kV line between Wan and White Marsh |
36 to 40 Months | $11,823,000 |
AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-017 |
Wreck and rebuild 2.69 miles of 230 kV line 2090 between Summit and Mine Rd |
36 to 42 Months | $7,791,250 |
AF2-035, AG1-412 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-018 |
Wreck and rebuild 2.58 miles of 230 kV line between Arnold's Corner to AF2-013 |
42 to 48 Months | $7,417,500 |
AF1-201, AF2-120, AG1-019, AG1-135, AG1-147, AG1-536 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-019 |
Wreck and rebuild 5.86 miles of 230 kV line 2028 between AF2-397 Tap to Grape Vine (Cunningham) |
42 to 48 Months | $16,847,500 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AF1-293, AF1-323, AF2-042, AF2-171, AF2-222, AF2-397, AG1-011, AG1-030, AG1-098, AG1-151, AG1-181, AG1-184, AG1-185, AG1-195, AG1-196, AG1-284, AG1-285, AG1-427, AG1-432, AG1-449, AG1-505, AG1-506, AG1-537, AG1-556 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-020 |
Replace Circuit Breaker Lead at Herbert for increased rating on line 1026 3HERBERT 115 KV to 3BOYDPLK 115 KV ckt 1 |
12 to 18 Months | $100,000 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-342, AG1-384, AG1-427, AG1-428, AG1-432, AG1-451 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-021 |
Wreck and rebuild 0.97 miles of 115 kV line between Herbert and Boydton Plank |
30 to 36 Months | $2,342,550 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-342, AG1-384, AG1-427, AG1-428, AG1-432, AG1-451 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-022 |
Wreck and Rebuild 0.62 miles of 115 kV line 153 between Oak Green and Unionville D.P |
30 to 36 Months | $1,302,000 |
AF1-301, AG1-538 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-023 |
Replace Wave Trap at Oak Green for increased rating on Line 153 3OAK GRE 115 KV to 3UNIONVIL TP 115 KV ckt 1 |
16 to 18 Months | $150,000 |
AF1-301, AG1-538 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-024 |
Replace Circuit Breaker Lead at Oak Green for increased rating on Line 153 3OAK GRE 115 KV to 3UNIONVIL TP 115 KV ckt 1 |
12 to 18 Months | $100,000 |
AF1-301, AG1-538 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-025 |
Replace Line Switch at Watkins for increased rating on Line 93 3S HAMPT 115 KV to 3WATKINS 115 KV ckt 1 |
12 to 18 Months | $220,000 |
AF2-046, AG1-008, AG1-343, AG1-394 |
AF1-266 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-026 |
Wreck and rebuild 0.76 miles of 115 kV line 93 between South Hampton and Watkins / additional station upgrades |
30 to 36 Months | $1,696,000 |
AF2-046, AG1-008, AG1-343, AG1-394 |
AF1-266 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-027 |
Replace Circuit Breaker for increased rating on Line 93 3S HAMPT 115 KV to 3WATKINS 115 KV ckt 1 |
42 to 48 Months | $1,300,000 |
AF2-046, AG1-008, AG1-343, AG1-394 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-028 |
Replace Circuit Breaker Line Lead at Altavista 138 kV for increased rating on Line 13 4ALTVSTA 138 KV to 05OTTER 138 KV ckt 1 |
12 to 18 Months | $100,000 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
AF2-403 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-029 |
Wreck and rebuild 2.63 miles of 230 kV line between Birdneck and Virginia Beach |
36 to 42 Months | $7,561,250 |
AE2-123 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-030 |
Replace Circuit Breaker at VA Beach for increased rating on Line 2118 6BIRDNECK 230 KV to 6VA BCH 230 KV ckt 1 |
42 to 48 Months | $1,500,000 |
AE2-123 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-033 |
Replace Wave Trap at Carson f |
16 to 18 Months | $200,000 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-034 |
Replace Circuit Breaker Switch at Carson and Line Switch at Chaparral |
12 to 18 Months | $825,000 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-035 |
Replace Circuit Breaker at Carson |
42 to 48 Months | $1,500,000 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-036 |
Wreck and rebuild 2.86 miles of 230 kV line between Locks and Chaparal |
36 to 42 Months | $8,222,500 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-037 |
Replace Wave Trap at Locks |
16 to 18 Months | $200,000 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-038 |
Replace Line Switch at Chaparral and Circuit Breaker Switch at Locks |
12 to 18 Months | $825,000 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-039 |
Replace CT Relay at Locks |
12 to 18 Months | $150,000 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-040 |
Replace Circuit Breaker at Locks |
42 to 48 Months | $1,500,000 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-041 |
Replace SEC Relay at Locks |
12 to 18 Months | $150,000 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-042 |
Wreck and rebuild 1.74 miles of 230 kV line between Chuckatuck and Benns Church |
36 to 42 Months | $5,002,500 |
AE2-123, AE2-124, AE2-147, AF2-047 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-043 |
Wreck and rebuild 5.7 miles of 230 kV line 2128 between Fentress and Thrasher |
42 to 48 Months | $34,040,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-044 |
Replace Circuit Breaker Switch at Fentress for increased rating on Line 2128 6FENTRES 230 KV to 6THRASHER 230 KV ckt 1 |
12 to 18 Months | $550,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-045 |
Repalce CT Relay at Fentress for increased rating on Line 2128 6FENTRES 230 KV to 6THRASHER 230 KV ckt 1 |
12 to 18 Months | $150,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-046 |
Replace Circuit Breaker Lead at Thrasher for increased rating on Line 2128 6FENTRES 230 KV to 6THRASHER 230 KV ckt 1 |
12 to 18 Months | $100,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-047 |
Replace Wave Trap at Fentress and Thrasher for increased rating on Line 2128 6FENTRES 230 KV to 6THRASHER 230 KV ckt 1 |
16 to 18 Months | $400,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-048 |
Replace Circuit Breaker at Fentress for increased rating on Line 2128 6FENTRES 230 KV to 6THRASHER 230 KV ckt 1 |
42 to 48 Months | $1,500,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-049 |
Replace Circuit Breaker Switch at Thrasher for increased rating on Line 2128 6FENTRES 230 KV to 6THRASHER 230 KV ckt 1 |
12 to 18 Months | $275,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-050 |
Upgrade Circuit Breaker Switch at Landstown for increased rating on Line 231 6LANDSTN 230 KV to 6STUMPY 230 KV ckt 1 |
12 to 18 Months | $550,000 |
AE2-123, AE2-124, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-051 |
Wreck and rebuild 10.7 miles of 230 kV line between Lanex and Lightfoot |
42 to 48 Months | $30,762,500 |
AE2-123, AE2-124, AE2-156, AF1-123, AF1-124, AF1-125, AG1-184, AG1-359, AG1-364, AG1-536 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-052 |
Wreck and rebuild 9.02 miles of 230kV line 2003 between Poe and Tyler / additional station upgrades |
42 to 48 Months | $25,932,500 |
AE2-313, AF1-266, AF2-042, AF2-046, AG1-008, AG1-153, AG1-160, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-053 |
Wreck and rebuild 13.8 miles of 230kV line between Poolesville and AG1-531 TAP |
42 to 48 Months | $79,350,000 |
AE2-123, AE2-124, AE2-270, AF2-065, AG1-011 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-054 |
Upgrade line lead equipment at Lake Ridge and Possum Point for increased rating on Line 237 6POSSUM 230 KV to 6LAKERD 230 KV ckt 1 |
12 to 18 Months | $200,000 |
AG1-019, AG1-412 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-055 |
Wreck and rebuild 4.82 miles of 230 kV line 2105 between Thrasher and Yadkin / additional station upgrades |
36 to 42 Months | $15,357,500 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-056 |
Replace Circuit Breaker Lead at Thrasher for increased rating on Line 2105 6THRASHER 230 KV to 6YADKIN 230 KV ckt 1 |
12 to 18 Months | $100,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-057 |
Replace Wave Trap at Yadkin and Thrasher for increased rating on Line 2015 6THRASHER 230 KV to 6YADKIN 230 KV ckt 1 |
16 to 18 Months | $400,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-359 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-058 |
Replace the Circuit Breaker at Chesterfield for increased rating on Line 2003 6TYLER 230 KV to 6CHESTF B 230 KV ckt 1 |
42 to 48 Months | $1,500,000 |
AE2-250, AE2-313, AF2-042, AG1-075, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-059 |
Replace Circuit Breaker Switch at Chesterfield for increased rating on Line 2003 6TYLER 230 KV to 6CHESTF B 230 KV ckt 1 |
12 to 18 Months | $550,000 |
AE2-250, AE2-313, AF2-042, AG1-075, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-060 |
Wreck and rebuild 2.58 miles of 230 kV line between Tyler and Chesterfield |
36 to 42 Months | $7,417,500 |
AE2-250, AE2-313, AF2-042, AG1-075, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-062 |
Replace Wave Trap at Landstown Substation |
16 to 18 Months | $200,000 |
AE2-123 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-063 |
Wreck and rebuild 3.65 miles of 230 kV Line 2118 between Birdneck and AE2-122 |
36 to 42 Months | $10,493,750 |
AE2-123 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-064 |
Replace Circuit Breaker at Landstown |
42 to 48 Months | $1,500,000 |
AE2-123 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-065 |
Replace Circuit Breaker Switch at Landstown |
12 to 18 Months | $550,000 |
AE2-123 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-066 |
Wreck and rebuild 1.25 miles of 115 kV line 65 between Garner and Lancaster |
30 to 36 Months | $2,625,000 |
AG1-135, AG1-146, AG1-147 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-067 |
Upgrade Farmville 115/230 kV transformer #1 to 260/271/295 MVA |
42 to 44 Months | $5,300,000 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-384, AG1-427, AG1-432, AG1-451 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-068 |
Upgrade Farmville 115/230 kV transformer #2 to 260/271/295 MVA |
42 to 44 Months | $5,300,000 |
AE1-148, AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-384, AG1-427, AG1-432, AG1-451 |
AF2-297, AG1-179, AG1-440, AG1-441, AG1-445, AG1-446 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-069 |
Build a second 18.75 mile Spotsylvania to Morrisville 500 kV (same ROW as Line 594) |
48 to 60 Months | $106,875,000 |
AE2-123, AE2-124, AE2-313, AF1-123, AF1-124, AF1-125, AF2-037, AF2-042, AF2-063, AG1-133, AG1-178, AG1-184, AG1-288, AG1-305 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-070 |
Wreck and rebuild the 16.52 miles of 511 Line and build a second circuit between Rawlings and Carson Line 511 |
48 to 60 Months | $94,164,000 |
AE2-313, AF2-042, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-071 |
Add a second line between Spotsylvania and North Anna (same ROW as Line 573) |
48 to 60 Months | $79,914,000 |
AE2-123, AE2-124, AE2-313, AF1-123, AF1-124, AF1-125, AF2-037, AF2-042, AF2-063, AG1-011, AG1-133, AG1-178, AG1-184, AG1-305 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-072 |
Build a second Lexington to Dooms 500 kV Line 555 |
48 to 60 Months | $248,665,000 |
AG1-124, AG1-421, AG1-422, AG1-556 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-073 |
Wreck and Rebuild the existing 37.41 mile line to monopole from Midlothian to Carson, and build a second line in existing ROW (Line 563) |
48 to 60 Months | $213,237,000 |
AE2-123, AE2-124, AE2-313, AF1-123, AF1-124, AF1-125, AF2-042, AG1-011, AG1-178, AG1-184, AG1-359, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-074 |
Wreck and rebuild existing Line 568 Ladysmith - Possum Point for single circuit |
48 to 60 Months | $273,296,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AG1-178 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-075 |
Farmville to Chase City upgrades: wreck and rebuild 115kV as DCT 115kV and 230kV |
42 to 48 Months | $243,000,000 |
AE1-148, AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-384, AG1-427, AG1-432, AG1-451 |
AF2-297, AG1-179, AG1-440, AG1-441, AG1-445, AG1-446 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-076 |
Wreck and rebuild 3.7 miles of Line 235 AG1-098 TP to Cloud Substation |
36 to 42 Months | $10,637,500 |
AF1-293, AF1-294, AF2-115, AF2-171, AF2-222, AF2-397, AG1-021, AG1-030, AG1-098, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-284, AG1-285, AG1-384, AG1-427, AG1-432, AG1-451 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-077 |
Wreck and rebuild 12.5 miles of 230 kV line 2104 between Stafford and Possum Point |
42 to 48 Months | $35,937,500 |
AG1-019, AG1-134, AG1-412 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-079 |
Replace Wave Trap at Surry for increased rating on Line 567 8SURRY 500 KV to 8CHCKAHM 500 KV ckt 1 |
16 to 18 Months | $300,000 |
AE2-123, AE2-124, AE2-147, AE2-156, AE2-313, AF1-123, AF1-124, AF1-125, AF2-042, AF2-047, AG1-178, AG1-184, AG1-359, AG1-364, AG1-439, AG1-449 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-080 |
Replace Line Lead at Surry for increased rating on Line 567 8SURRY 500 KV to 8CHCKAHM 500 KV ckt 1 |
12 to 18 Months | $100,000 |
AE2-123, AE2-124, AE2-147, AE2-156, AE2-313, AF1-123, AF1-124, AF1-125, AF2-042, AF2-047, AG1-178, AG1-184, AG1-359, AG1-364, AG1-439, AG1-449 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-081 |
Replace Circuit Breaker and Relay at Surry for increased rating on Line 567 8SURRY 500 KV to 8CHCKAHM 500 KV ckt 1 |
42 to 48 Months | $2,650,000 |
AE2-123, AE2-124, AE2-147, AE2-156, AE2-313, AF1-123, AF1-124, AF1-125, AF2-042, AF2-047, AG1-178, AG1-184, AG1-359, AG1-364, AG1-439, AG1-449 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-082 |
Replace Circuit Breaker Switch at Surry for increased rating on 8SURRY 500 KV to 8CHCKAHM 500 KV ckt 1 |
12 to 18 Months | $900,000 |
AE2-123, AE2-124, AE2-147, AE2-156, AE2-313, AF1-123, AF1-124, AF1-125, AF2-042, AF2-047, AG1-178, AG1-184, AG1-359, AG1-364, AG1-439, AG1-449 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-083 |
Wreck and Rebuild 2.48 miles of 115 kV line between Oak Green and Orange Tap |
30 to 36 Months | $5,208,000 |
AF1-301 |
AF2-037, AF2-063, AG1-305, AG1-538 |
|||||
Dominion | (Pending) / TC1-PH1-DOM-084 |
Wreck and rebuild 5.88 miles of Line 235 AD1-088 TP to Briery |
42 to 48 Months | $16,910,750 |
AE1-148, AE2-291, AE2-292, AF2-042, AF2-297, AG1-098, AG1-105, AG1-427, AG1-440, AG1-441, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-085 |
Wreck and rebuild 16.65 miles of Line 235 AD1-088 TP to AG1-098 TP |
42 to 48 Months | $47,863,000 |
AF1-293, AF1-294, AF2-115, AF2-171, AF2-222, AF2-397, AG1-021, AG1-030, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-284, AG1-285, AG1-384, AG1-427, AG1-432, AG1-451 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-087 |
Addition of 230/500 kV Transformer at Carson Substation. |
42 to 44 Months | $40,000,000 |
AE2-123, AE2-124, AE2-313, AF1-123, AF1-124, AF1-125, AF1-266, AF2-042, AG1-153, AG1-160, AG1-178, AG1-184, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-089 |
Substation Expansion work at Morrisville 500 kV Substation |
36 to 40 Months | $40,000,000 |
AF1-123, AF1-124, AF1-125, AG1-178 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-090 |
Wreck and Rebuild the existing 41.13 mile line to monopole from North Anna to Midlothian and build a second line in existing ROW (Line 576) |
48 to 60 Months | $234,441,000 |
AE2-123, AE2-124, AE2-270, AE2-313, AF1-123, AF1-124, AF1-125, AF2-042, AG1-011, AG1-178, AG1-184, AG1-359, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-091 |
Early Sub CB Switch Replacement |
12 to 18 Months | $550,000 |
AF2-046, AF2-047, AF2-080, AF2-324, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-092 |
Wreck and rebuild 2.38 miles of 230 kV Line 2131 between Perquimanns and West Albemarle |
36 to 42 Months | $8,342,500 |
AF2-046, AF2-047, AF2-080, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-093 |
Wreck and rebuild 2.58 miles of 230 kV Line 2131 between West Albemarle and Chowan |
36 to 42 Months | $7,417,500 |
AF2-046, AF2-047, AF2-080, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-094 |
Wreck and rebuild 0.09 miles of 230 kV Line 2131 between Chowan and Edenton |
36 to 42 Months | $258,750 |
AF2-046, AF2-047, AF2-080, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-095 |
Wreck and rebuild 10.58 miles of 230 kV Line 2131 between Edenton and Mackeys |
36 to 42 Months | $31,917,500 |
AF2-046, AF2-047, AF2-080, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-096 |
Reconductor 115 kV Line #1047 From Huber DP to Sedge Hill. |
30 to 36 Months | $3,861,000 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
|
|||||
Dominion | (Pending) / TC1-PH1-DOM-097 |
Substation work for Energizing the bremo Tx#7 |
6 to 12 Months | $100,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AF1-293, AF2-171, AF2-222, AF2-397, AG1-030, AG1-098, AG1-181, AG1-285, AG1-426, AG1-427, AG1-432, AG1-537 |
AE1-148, AF1-294, AG1-105, AG1-185, AG1-451, AG1-494 |
|||||
Dominion | (Pending) / dom-022 |
Add additional 500/230 kV transformer at Chickahominy substation. |
42 to 44 Months | $40,000,000 |
AE2-123, AE2-124, AE2-156, AE2-270, AF1-123, AF1-124, AF1-125, AF1-201, AF2-065, AF2-120, AG1-011, AG1-075, AG1-135, AG1-147, AG1-359, AG1-364, AG1-536 |
|
|||||
Dominion | (Pending) / dom-122 |
Add additional 138/115 kV transformer at Altavista substation |
42 to 44 Months | $6,500,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AF2-403, AF2-404, AG1-539 |
AG1-547 |
|||||
Dominion | (Pending) / dom-164 |
Rebuild 7.0 miles of 230 kV Line 208 from Iron Bridge to Southwest with (2) 768.2 ACSS |
42 to 48 Months | $20,355,000 |
AE2-123, AE2-124, AE2-270, AF1-123, AF1-124, AF1-125, AF1-128, AF1-201, AF2-065, AG1-011, AG1-359 |
|
|||||
Dominion | (Pending) / dom-184 |
Reconductor 15 kV Line 1016 from AC1-222 Tap to Huber DP |
30 to 36 Months | $1,261,000 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
|
|||||
Dominion | (Pending) / dom-216 |
Rebuild 7.8 miles of 230 kV Line 289 from Kings Fork to Chuckatuck with (2) 768.2 ACSS. |
42 to 48 Months | $22,425,000 |
AE2-123, AE2-124, AE2-147, AF1-123, AF1-124, AF1-125, AF2-046, AF2-047, AG1-008, AG1-359, AG1-437, AG1-438, AG1-439 |
|
|||||
Dominion | (Pending) / dom-269 |
Reconductor 5.04 miles of 115 kV line 189 from Terra to Five Point with 768 ACSS. |
30 to 36 Months | $6,772,000 |
AF2-047 |
|
|||||
Dominion | (Pending) / dom-301 |
Rebuild 12.4 miles of 230 kV Line 259 from Chesterfield to Basin with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. And breaker equipment. |
36 to 40 Months | $38,450,000 |
AE2-123, AE2-124, AE2-147, AE2-270, AE2-313, AF1-123, AF1-124, AF1-125, AF1-266, AF2-042, AF2-046, AF2-047, AF2-065, AG1-008, AG1-011, AG1-075, AG1-178, AG1-184, AG1-359, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | (Pending) / dom-311 |
Rebuild 6.8 miles of 230 kV Line 289 from Suffolk to Kings Fork with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 deg C |
36 to 40 Months | $17,000,000 |
AE2-123, AE2-124, AE2-147, AF1-123, AF1-124, AF1-125, AF2-046, AF2-047, AG1-008, AG1-359, AG1-437, AG1-438, AG1-439 |
|
|||||
Dominion | (Pending) / dom-329 |
Rebuild 2.0 miles of 230 kV Line 2034 from Cashie to AG1-437 Tap with 2-768.2 ACSS 250 C. Replace Line Switch and Line Lead at Cashie terminal. |
30 to 36 Months | $6,025,000 |
AF2-047 |
|
|||||
Dominion | (Pending) / dom-470 |
Rebuild 7.33 miles of 230 kV Line 2160 from Chinquapin to AC1-189 Tap. |
36 to 40 Months | $21,073,750 |
AF2-324, AG1-106, AG1-439, AG1-444 |
|
|||||
Dominion | b3211 |
Rebuild the 1.3 mile section of 500 kV Line No.569 (Loudoun - Morrisville) |
Dec 31 2025 | $0 |
|
AF1-123, AF1-124, AF1-125, AG1-178 |
|||||
Dominion | b3694.8 / dom-298 |
Partial wreck and rebuild 10.34 miles of 230 kV line #249 Carson-Locks to achieve a minimum summer emergency rating of 1047 MVA. |
Jun 30 2025 | $15,365,000 |
|
AE2-313, AF1-266, AF2-042, AG1-178, AG1-184, AG1-439, AG1-449 |
|||||
Dominion | b3800.359 |
Wreck and rebuild Line #2090 Ladysmith CT – Summit D.P. segment as a double circuit 230kV line to achieve a summer rating of 1573 MVA. |
Jun 29 2027 | $0 |
|
AG1-412 |
|||||
Dominion | n6113 |
Add additional 230/115 kV transformer at Carolina substation. |
42 to 44 Months | $6,500,000 |
AE1-148, AF2-046, AG1-008, AG1-343, AG1-440, AG1-441, AG1-552 |
AG1-394, AG1-428, AG1-445, AG1-446 |
|||||
Dominion | n6114 |
Add additional 230/115 kV transformer at Clubhouse substation. |
16 to 18 Months | $13,653,448 |
AE1-148, AF2-042, AF2-046, AF2-171, AF2-222, AF2-299, AG1-008, AG1-030, AG1-105, AG1-179, AG1-180, AG1-181, AG1-185, AG1-285, AG1-427, AG1-428, AG1-432, AG1-440, AG1-441, AG1-505, AG1-506 |
AF2-297, AG1-098, AG1-106, AG1-343, AG1-445, AG1-446 |
|||||
Dominion | n6118 |
Upgrade the breaker leads at DVPs Battleboro terminal will bring the rating to 239/239/239 MVA (Limited by terminal equipment at Rocky Mount) |
Jan 01 2025 | $100,000 |
|
AF2-046, AF2-080, AF2-299, AF2-324, AG1-008, AG1-082, AG1-083, AG1-106, AG1-343, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444, AG1-552 |
|||||
Dominion | n6138 / dom-017 |
Rebuild 13.7 miles of 230 kV Line 246 from Earleys to Nucor Tap with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
36 to 40 Months | $39,387,500 |
AF1-266, AF2-046, AF2-047, AF2-080, AF2-324, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | n6138.1 / dom-315 |
Replace wave trap at Earleys. |
Nov 15 2024 | $200,000 |
AF1-266, AF2-046, AF2-047, AF2-080, AF2-324, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | n6143 / dom-087 |
Rebuild 5.88 miles of 115 kV Line 189 from Five Points DP to Wharton with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
30 to 36 Months | $12,348,000 |
AF2-047 |
|
|||||
Dominion | n6144 / dom-173 |
Rebuild 20.5 miles of 230 kV Line #218 from Everetts to Greenville with 2-636 ACSR |
30 to 36 Months | $39,923,299 |
|
AG1-443, AG1-444 |
|||||
Dominion | n6161 / dom-039 |
Replace Circuit Breaker at Clifton |
42 to 48 Months | $2,500,000 |
AF1-123, AF1-124, AF1-125, AG1-178 |
|
|||||
Dominion | n6163 / dom-008 |
Rebuild 5.67 miles of 115 kV Line 73 from Four Rivers to Hanover with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
36 to 40 Months | $13,693,050 |
AG1-134 |
|
|||||
Dominion | n6164 |
Rebuild 3.3 miles of 115 kV Line 73 from Hanover to Elmont with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
30 to 36 Months | $7,969,500 |
AG1-134 |
|
|||||
Dominion | n6219 / dom-034 |
Rebuild 15.49 miles of 230 kV Line 298 from Buckingham to Bremo with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor 250 degrees C. |
30 to 36 Months | $46,841,250 |
AE1-148, AE2-291, AE2-292, AF1-294, AF2-042, AF2-115, AF2-171, AF2-222, AF2-297, AG1-021, AG1-030, AG1-098, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-342, AG1-384, AG1-427, AG1-428, AG1-432, AG1-440, AG1-441, AG1-451, AG1-505, AG1-506, AG1-539 |
|
|||||
Dominion | n6221 |
Rebuild 11.79 miles of 230 kV Line 238 from Sapony to Carson with 2-795 150C ACSR. |
30 to 36 Months | $17,685,000 |
AE1-148, AF1-266, AF2-046, AF2-047, AF2-080, AF2-171, AF2-222, AF2-324, AG1-008, AG1-030, AG1-106, AG1-179, AG1-181, AG1-285, AG1-427, AG1-428, AG1-437, AG1-438, AG1-439, AG1-444 |
|
|||||
Dominion | n6245 / dom-346 |
Rebuild 12.76 miles of 230 kV Line 298 from Buckingham to Farmville with 2-768.2 ACSS 250 C. Replace Line Lead, Line Switch, Relay (CT), Wave trap at Farmville terminal |
Dec 30 2025 | $19,710,000 |
AE1-148, AE2-291, AE2-292, AF1-294, AF2-042, AF2-115, AF2-171, AF2-222, AF2-297, AG1-021, AG1-030, AG1-098, AG1-105, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-272, AG1-273, AG1-274, AG1-285, AG1-342, AG1-384, AG1-427, AG1-428, AG1-432, AG1-440, AG1-441, AG1-451, AG1-505, AG1-506, AG1-539 |
|
|||||
Dominion | n6314 / dom-011 |
Rebuild 10.28 miles of 230 kV Line 2021 from Elizabeth City to Shawboro with 2-636 ACSR. |
30 to 36 Months | $15,420,000 |
AE2-147, AF1-152, AF2-046, AF2-047, AF2-080, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | n6438 / dom-090 |
Rebuild 4.65 miles of 230 kV Line 2131 from Perquimans to South Hertford with 2-636 ACSR. |
30 to 36 Months | $6,975,000 |
AF2-046, AF2-047, AF2-080, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | n6439 / dom-094 |
Rebuild 3.3 miles of 230 kV Line 2131 from South Hertford to Winfall with 2-636 ACSR. |
30 to 36 Months | $4,950,000 |
AF2-046, AF2-047, AF2-080, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | n6452 |
Rebuild 2.47 miles of 230 kV Line 238 from AE2-033 TAP to Sapony with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C and Line Switch at Sapony. |
30 to 36 Months | $7,451,250 |
AE1-148, AF1-266, AF2-046, AF2-047, AF2-080, AF2-171, AF2-222, AF2-324, AG1-008, AG1-030, AG1-106, AG1-179, AG1-181, AG1-285, AG1-427, AG1-428, AG1-437, AG1-438, AG1-439, AG1-444 |
|
|||||
Dominion | n6551 / dom-159 |
Rebuild 7.32 miles of 230 kV Line 208 from Chesterfield to Iron Bridge with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
36 to 40 Months | $21,045,000 |
AE2-123, AE2-124, AE2-270, AF1-123, AF1-124, AF1-125, AF1-128, AF1-201, AF2-065, AG1-011, AG1-359 |
|
|||||
Dominion | n6581 / dom-120 |
Rebuild 12.68 miles of 230 kV Line 2002 from Carson to Poe with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
36 to 40 Months | $36,455,000 |
AE2-313, AF1-266, AF2-042, AF2-222, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | n6605 / dom-101 |
Wreck and rebuild 7.2 miles of line 271 between Pocaty and Landstown |
Dec 31 2026 | $20,700,000 |
AE2-123, AE2-124, AE2-156, AF1-123, AF1-124, AF1-125, AG1-359, AG1-364 |
|
|||||
Dominion | n6606 / dom-100 |
Rebuild 1.76 miles of 230 kV Line 2240 from Pocaty to Fentress |
Dec 31 2026 | $5,060,000 |
AE2-123, AE2-124, AE2-156, AF1-123, AF1-124, AF1-125, AG1-359, AG1-364 |
|
|||||
Dominion | n6607 / dom-116 |
Rebuild 5.88 miles of 230 kV Line 2026 from Landstown to Lynnhaven with (2) 768.2 ACSS/TW (20/7) "MAUMEE" |
Dec 31 2026 | $16,905,000 |
AE2-123, AE2-124, AE2-147, AF1-123, AF1-124, AF1-125, AF2-081, AG1-359 |
|
|||||
Dominion | n6608 / dom-148 |
Reconductor 2.88 miles of 115 kV Line 27 from Virginia Beach to Bains Store with 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
Dec 31 2026 | $3,744,000 |
AE2-123, AE2-124 |
|
|||||
Dominion | n6610 / dom-123 |
Rebuild 7.4 miles of 69 kV Line 35 from AE2-283 Tap to Stone Mill with (1) 768.2 ACSS/TW (20/7) "MAUMEE". |
30 to 36 Months | $17,871,000 |
AE2-185, AE2-283 |
|
|||||
Dominion | n6613 / dom-169 |
Rebuild 4.4 miles of 230 kV Line 2072 from Virginia Beach to Lynnhaven. |
Dec 31 2027 | $13,200,000 |
AE2-123 |
|
|||||
Dominion | n6618.1 |
Hathaway 115 kV Bus Split. |
30 to 36 Months | $20,749 |
|
AF2-046, AF2-080, AF2-299, AF2-324, AG1-008, AG1-082, AG1-083, AG1-106, AG1-343, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444, AG1-552 |
|||||
Dominion | n6846 / dom-209 |
Rebuild 14.7 miles of 230 kV Line 256 from Four Rivers to St Johns with 2-768 |
36 to 40 Months | $44,611,250 |
AE2-270, AG1-011 |
|
|||||
Dominion | n6849 / dom-221 |
Rebuild 30.6 miles of 230 kV Line 246 from Nuco TP to Suffolk with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 C. |
48 to 60 Months | $45,900,000 |
AF1-266, AF2-046, AF2-047, AF2-080, AF2-324, AG1-008, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444 |
|
|||||
Dominion | n6872 / dom-047 |
Rebuild 14.28 miles of 230 kV Line 238 from Clubhouse to AE2-033 Tap with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
36 to 40 Months | $41,055,000 |
AE1-148, AF2-046, AF2-047, AF2-080, AF2-171, AF2-222, AF2-299, AF2-324, AG1-008, AG1-030, AG1-106, AG1-179, AG1-181, AG1-285, AG1-343, AG1-427, AG1-428, AG1-437, AG1-438, AG1-439, AG1-440, AG1-441, AG1-444 |
|
|||||
Dominion | n6873 / dom-223 |
Rebuild 9.2 miles of 230 kV Line 2034 from Trowbridge to AD1-022 with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 C. |
36 to 40 Months | $26,450,000 |
AF2-047 |
|
|||||
Dominion | n6875 / dom-233 |
Rebuild 5.3 miles of 230 kV line 2034 from AD1-022 Tap to Cashie with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor 250 C. |
36 to 40 Months | $15,237,500 |
AF2-047 |
|
|||||
Dominion | n6879 / dom-200 |
Wreck and rebuild 5.6 miles of existing single circuit line 2020 between El [...] ts. Add a three breaker station at Pasquotank and Elizabeth City DP 230 kV. |
36 to 40 Months | $32,200,000 |
AE2-147, AF1-152, AF2-046, AF2-047, AG1-008, AG1-437, AG1-438, AG1-439 |
|
|||||
Dominion | n7029 / dom-121 |
Add additional 138/69 kV transformer at Altavista substation |
42 to 44 Months | $6,500,000 |
AE2-185, AE2-187, AE2-283, AF2-403, AG1-547 |
|
|||||
Dominion | n7180 / dom-199 |
Rebuild 7.2 miles of 230 kV Line 235 from Prince EDW to Farmville with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 C. |
30 to 36 Months | $20,700,000 |
AE1-148, AE2-291, AE2-292, AF2-042, AF2-297, AG1-098, AG1-105, AG1-427, AG1-440, AG1-441, AG1-505, AG1-506 |
|
|||||
Dominion | n7509 / dom-261 |
Reconductor 5.0 miles of 115 kV line 153 from Unionville to Locust Grove with 768.2 ACSS 250 C. |
30 to 36 Months | $3,300,000 |
|
AF1-301, AG1-538 |
|||||
Dominion | n7511 / dom-367 |
Reconductor 3.2 miles of 115 kV Line 153 from Pine Glade to Paytes Tap with 768.2 ACSS 250 C. Replace Line switch at Locust Grove. |
30 to 36 Months | $4,380,000 |
|
AF1-301, AG1-538 |
|||||
Dominion | n7513 / dom-474 |
Rebuild 1.07 miles of 230 kV Line 299 from Marsh Run to Remington CT with (2) 768.2 ACSS/TW (20/7) "MAUMEE" 250 C. |
36 to 42 Months | $2,900,000 |
|
AF1-301, AG1-538 |
|||||
Dominion | n7526 / dom-429 |
Reconductor 0.877 miles of 115 kV Line 65 from Whitestone to Rappahannock with 768.2 ACSS 250 C. |
30 to 36 Months | $1,140,100 |
AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
|
|||||
Dominion | n7541 / dom-016 |
230/115 kV Transformer Addition at Earleys Substation |
42 to 44 Months | $6,500,000 |
AF2-046, AG1-008, AG1-082, AG1-083, AG1-343 |
AG1-394 |
|||||
Dominion | n7543 / dom-426 |
Rebuild 115 kV Line 1045 from Butcher Creek to Chase City |
36 to 40 Months | $4,865,550 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-432, AG1-451 |
|
|||||
Dominion | n7549 / dom-428 |
Replace Northern Neck 115/230 kV Transformer #1 |
42 to 44 Months | $6,500,000 |
AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
AF1-201 |
|||||
Dominion | n7553 / dom-427 |
Replace Northern Neck 115/230 kV Transformer #2 with a 224 MVA (299/313/345 MVA) |
42 to 44 Months | $6,500,000 |
AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
AF1-201 |
|||||
Dominion | n7555 / dom-414 |
Reconductor 5.9 miles of 115 kV Line 65 from AG1-146 Tap to Lancaster with 768.2 ACSS 250 C. replace Line Switch at Lancaster terminal. |
Dec 01 2024 | $7,890,000 |
AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
|
|||||
Dominion | n7556 / dom-461 |
Reconductor 6.038 miles of 115 kV Line 65 from AD2-074 Tap to AG1-146 Tap with 768.2 ACSS 250 C. |
30 to 36 Months | $7,849,400 |
AF2-120, AG1-135, AG1-536 |
|
|||||
Dominion | n7566 / dom-265 |
Rebuild 5 miles of 230 kV Line 2028 from Fork Union to AF2-397 Tap with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
36 to 42 Months | $12,500,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AF1-293, AF1-323, AF2-042, AF2-171, AF2-222, AF2-397, AG1-011, AG1-030, AG1-098, AG1-151, AG1-181, AG1-184, AG1-185, AG1-195, AG1-196, AG1-284, AG1-285, AG1-427, AG1-432, AG1-449, AG1-505, AG1-506, AG1-537, AG1-556 |
|
|||||
Dominion | n7567 / dom-276 |
Rebuild 1.63 miles of 230 kV Line 2028 from Fork Union to Bremo Dist with 2-795 ACSR (26/7) 150 C |
30 to 36 Months | $4,686,250 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AF1-293, AF1-294, AF2-042, AF2-171, AF2-222, AF2-397, AG1-011, AG1-030, AG1-098, AG1-151, AG1-181, AG1-184, AG1-185, AG1-195, AG1-196, AG1-285, AG1-359, AG1-426, AG1-427, AG1-432, AG1-449, AG1-451, AG1-505, AG1-506, AG1-537, AG1-556 |
|
|||||
Dominion | n7568 / dom-369 |
Rebuild 6.47 miles of 230 kV Line 2028 from Mt Eagle to Charlottesville with 2-768.2 ACSS 250 C. Replace Wave Trap and CB Switch at Charlottesville terminal |
36 to 40 Months | $19,351,250 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AF1-293, AF1-323, AF2-042, AF2-171, AF2-222, AF2-397, AG1-011, AG1-030, AG1-098, AG1-151, AG1-181, AG1-184, AG1-185, AG1-195, AG1-196, AG1-284, AG1-285, AG1-427, AG1-432, AG1-449, AG1-505, AG1-506, AG1-537, AG1-556 |
|
|||||
Dominion | n7569 / dom-490 |
Reconductor 6.51 miles of line between Mt. Eagle and Cunningham |
36 to 40 Months | $37,432,500 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AF1-293, AF1-323, AF2-042, AF2-171, AF2-222, AF2-397, AG1-011, AG1-030, AG1-098, AG1-151, AG1-181, AG1-184, AG1-185, AG1-195, AG1-196, AG1-284, AG1-285, AG1-427, AG1-432, AG1-449, AG1-505, AG1-506, AG1-537, AG1-556 |
|
|||||
Dominion | n7575 / dom-286 |
Rebuild 7.24 mi miles of 230 kV Line 2083 from Fredericksburg to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor 250 degrees C. |
Dec 01 2024 | $20,815,000 |
AF1-201, AF2-120, AG1-019, AG1-135, AG1-147, AG1-536 |
|
|||||
Dominion | n7576 / dom-281 |
Rebuild 7.91 miles of 230 kV Line 2083 from Birchwood to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor 250 degrees C. |
Dec 01 2024 | $22,741,250 |
AF1-201, AF2-120, AG1-019, AG1-135, AG1-147, AG1-536 |
|
|||||
Dominion | n7580 / dom-365 |
Rebuild 8.72 miles of 230 kV Line 2054 from Charlottesville to Profit D.P. with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
36 to 40 Months | $25,156,250 |
AF1-293, AF2-397, AG1-151, AG1-195, AG1-196, AG1-421, AG1-432, AG1-556 |
|
|||||
Dominion | n7581 / dom-366 |
Rebuild 4.27 miles of 230 kV Line 2135 from Hollymead to Cashs Corner D.P. with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
Dec 31 2024 | $12,276,250 |
AF1-293, AF2-397, AG1-151, AG1-195, AG1-196, AG1-421, AG1-556 |
|
|||||
Dominion | n7610 / dom-435 |
Rebuild Line 230 kV Line #249 from Carson to Chaparral |
Dec 01 2024 | $44,092,500 |
AE2-313, AF1-266, AF2-042, AF2-046, AF2-222, AG1-008, AG1-178, AG1-184, AG1-439, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | n7611 / dom-413 |
Rebuild 9.1 miles of 500 kV Line 575 from Ladysmith to AG1-133 Tap with 3-1351.5 113C ACSR. Replace wave Trap, Line lead at Ladysmith terminal. |
Dec 01 2024 | $52,170,000 |
AE2-313, AF1-123, AF1-124, AF1-125, AF2-037, AF2-042, AF2-063, AG1-133, AG1-178, AG1-184, AG1-305 |
|
|||||
Dominion | n7612 / dom-015 |
Add additional 230/115 kV transformer at Suffolk substation. |
42 to 44 Months | $6,500,000 |
AF2-046, AG1-008, AG1-343 |
AG1-394 |
|||||
Dominion | n7613 / dom-398 |
Reconductor 10.06 miles of 138 kV line 65 from AE1-155 Tap to Northern Neck with (2) 768 ACSS 250 C. Replace Line Switch and wave trap at Northern neck terminal |
Dec 01 2024 | $24,713,200 |
AF1-201, AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
|
|||||
Dominion | n7614 / dom-404 |
Reconductor 1.4 miles of 115 kV Line 89 from Hayes to AF1-201 Tap with (1) 768.2 ACSS 250 C. Replace Line Switch at Hayes terminal. |
30 to 36 Months | $2,040,000 |
AF1-201, AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
|
|||||
Dominion | n7631 / dom-504 |
Reconductor 115 kV Line #118 from Merck to N. Shenanddah . |
36 to 40 Months | $15,665,000 |
AG1-196 |
|
|||||
Dominion | n7634 / dom-379 |
Rebuild 500 kV Line #575 from North Anna to AG1-133 Tap. |
48 to 60 Months | $31,165,500 |
AE2-313, AF1-123, AF1-124, AF1-125, AF2-037, AF2-042, AF2-063, AG1-178, AG1-184, AG1-305 |
|
|||||
Dominion | n7645 / dom-484 |
Add additional 500/230 kV transformer Suffolk Substation |
Dec 31 2024 | $40,000,000 |
AE2-123, AE2-124, AE2-147, AE2-156, AE2-270, AF1-123, AF1-124, AF1-125, AF1-152, AF2-046, AF2-047, AF2-081, AG1-008, AG1-343, AG1-359, AG1-364, AG1-437, AG1-438, AG1-439 |
|
|||||
Dominion | n7660 / dom-371 |
Brunswick Substation: 115/69 kV Transformer Addition |
42 to 44 Months | $6,500,000 |
AG1-179, AG1-180 |
|
|||||
Dominion | n7661 / dom-501 |
Rebuild 115 kV Line #1034 from Victoria to Lunenburg |
36 to 40 Months | $5,586,400 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-432, AG1-451 |
|
|||||
Dominion | n7662 / dom-512 |
Rebuild 115 kV Line #1034 from AG1-030 Tap to Victoria DP |
36 to 40 Months | $14,492,650 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-432, AG1-451 |
|
|||||
Dominion | n7667 / dom-448 |
Rebuild 115 kV Line #33 from Mt. Laurel -AC1-105 Tap -Sedge Hill. |
Dec 01 2024 | $26,505,400 |
AE1-148, AF1-294, AF2-115, AF2-171, AF2-222, AG1-030, AG1-105, AG1-181, AG1-185, AG1-285, AG1-342, AG1-427, AG1-428, AG1-432, AG1-440, AG1-441 |
AG1-272, AG1-273, AG1-274, AG1-384 |
|||||
Dominion | n7675 / dom-393 |
Reconductor 115 kV Line#98 from AD2-033 Tap to Butcher Creek. |
36 to 40 Months | $16,634,000 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-432, AG1-451 |
|
|||||
Dominion | n7676 / dom-271 A |
Rebuild 17.89 miles of 115 kV line 158 from Farmville - Moran DP - Flat Creek - Lone Pine |
36 to 40 Months | $44,014,350 |
AF1-294, AF2-115, AG1-021, AG1-030, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170 |
|
|||||
Dominion | n7681 / dom-482 |
Rebuild 115 kV line #98 from Lunenburg to AD2-033 Tap |
30 to 36 Months | $7,153,500 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-432, AG1-451 |
|
|||||
Dominion | n7685 / dom-283 |
Rebuild 4.56 miles of 230 kV Line 2157 from Fredericksburg to Cranes Corner with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 C. |
30 to 36 Months | $13,110,000 |
AG1-019, AG1-134, AG1-412 |
|
|||||
Dominion | n7687 / dom-046 |
Add additional 230/115 kV transformer at Sedge Hill substation. |
42 to 44 Months | $6,500,000 |
AE1-148, AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AF2-171, AF2-222, AF2-297, AG1-030, AG1-105, AG1-181, AG1-185, AG1-285, AG1-342, AG1-427, AG1-432, AG1-539, AG1-547 |
AF2-404, AG1-440, AG1-441 |
|||||
Dominion | n7688 / dom-502 |
Rebuild 115 kV Line #1034 from Victoria to Victoria DP |
36 to 40 Months | $5,801,300 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-030, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-432, AG1-451 |
|
|||||
Dominion | n7691 / dom-499 |
Rebuild 115 kV Line #1034 from Martin Tap to AG1-030 Tap. |
36 to 42 Months | $700,350 |
AF1-294, AF2-115, AF2-171, AF2-222, AG1-021, AG1-166, AG1-167, AG1-168, AG1-169, AG1-170, AG1-181, AG1-185, AG1-432, AG1-451 |
|
|||||
Dominion | n7694 / dom-486 |
Reconductor 115 kV line #65 from Lancaster to Ocran. |
30 to 36 Months | $4,133,000 |
AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
|
|||||
Dominion | n7695 / dom-274 |
Reconductor 5.59 miles of 115 kV line 89 from White Marsh to AF1-201 Tap with 768 ACSS/TW (20/7) "MAUMEE" |
Dec 01 2024 | $7,267,000 |
AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
|
|||||
Dominion | n7697 / dom-522 |
Hayes Substation : Transformer Addition |
Dec 01 2024 | $6,500,000 |
AF1-201, AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
|
|||||
Dominion | n7698 / dom-394 |
Reconductor 1.732 miles of 115 kV Line 65 from AD2-074 Tap to AG1-135 Tap with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
Dec 01 2024 | $2,251,600 |
AG1-146, AG1-147 |
|
|||||
Dominion | n7741 / dom-327 |
Reconductor 115 kV Line #136 from Tunis to Ahoskie. |
30 to 36 Months | $17,498,000 |
AF2-046, AG1-008, AG1-343 |
AG1-394 |
|||||
Dominion | n7765 / dom-356 |
Reconductor 115 kV Line 31 from Perth to AE2-291 Tap. |
30 to 36 Months | $7,371,000 |
AE1-148, AF2-042, AF2-171, AF2-222, AF2-297, AG1-030, AG1-098, AG1-105, AG1-181, AG1-285, AG1-342, AG1-427, AG1-432, AG1-440, AG1-441, AG1-505, AG1-506 |
AG1-185 |
|||||
Dominion | n7785 / dom-364 |
Rebuild 9.46 miles of 230 kV Line 2027 from Bremo to Cartersville with 2-768 ACSS 250 C. |
36 to 40 Months | $27,197,500 |
AF1-293, AF1-323, AF2-042, AF2-171, AF2-222, AF2-397, AG1-030, AG1-098, AG1-181, AG1-284, AG1-285, AG1-427, AG1-432, AG1-505, AG1-506 |
|
|||||
Dominion | n7789 / dom-363 |
Rebuild 0.16 miles of Line 2193 from Bremo to Bremo Dist |
30 to 36 Months | $1,948,000 |
AE2-123, AE2-124, AF1-123, AF1-124, AF1-125, AF1-293, AF1-294, AF2-042, AF2-171, AF2-222, AF2-397, AG1-011, AG1-030, AG1-098, AG1-151, AG1-181, AG1-184, AG1-185, AG1-195, AG1-196, AG1-285, AG1-359, AG1-426, AG1-427, AG1-432, AG1-449, AG1-451, AG1-505, AG1-506, AG1-537, AG1-556 |
|
|||||
Dominion | n7796 / dom-302/3 |
Rebuild 14.18 miles of 230 kV Line 2027 from Powhatan to Midlothian with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 C. |
36 to 40 Months | $40,767,500 |
AF1-293, AF1-323, AF2-042, AF2-171, AF2-222, AF2-397, AG1-030, AG1-098, AG1-181, AG1-195, AG1-196, AG1-284, AG1-285, AG1-427, AG1-432, AG1-505, AG1-506 |
|
|||||
Dominion | n7812 / dom-397 |
Reconductor 7.3 miles of 138 kV Line 8 from AE1-108 Tap to Bremo with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor. |
Dec 01 2024 | $9,490,000 |
AF1-323, AF2-302, AG1-022, AG1-123, AG1-124, AG1-426, AG1-494 |
AE2-185, AE2-187, AE2-283 |
|||||
Dominion | n8056 |
Wreck and rebuild the existing 115 kV Line and Add new 230 kV Circuit |
36 to 42 Months | $32,493,499 |
AE2-123, AE2-124, AE2-270, AF1-123, AF1-124, AF1-125, AF2-065, AG1-011 |
AG1-174, AG1-531 |
|||||
Dominion | n8149 / dom-013 |
Add Additional 500/230 kV Transformer at Elmont Substation |
42 to 44 Months | $40,000,000 |
AE2-123, AE2-124, AE2-147, AE2-156, AE2-250, AE2-270, AE2-313, AF1-123, AF1-124, AF1-125, AF1-201, AF1-266, AF2-046, AF2-047, AF2-065, AF2-120, AG1-008, AG1-011, AG1-075, AG1-134, AG1-135, AG1-147, AG1-178, AG1-184, AG1-359, AG1-364, AG1-449, AG1-536 |
|
|||||
Dominion | n8152 / dom-378 |
Add additional 500/230 kV transformer at Midlothian Substation |
42 to 44 Months | $40,000,000 |
AE2-123, AE2-124, AE2-270, AE2-313, AF1-123, AF1-124, AF1-125, AF1-293, AF2-042, AG1-011, AG1-178, AG1-184, AG1-432, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | n8164 / dom-241 |
Rebuild 9.6 miles of 230 kV Line 255 from AF2-037 Tap to North Anna with 2-768 ACSR. Upgrade Relay and Wave trap at North Anna. |
Dec 30 2025 | $27,950,000 |
AF1-301, AF2-037, AF2-063, AG1-305, AG1-538 |
|
|||||
Dominion | n8238 / dom-294 |
Rebuild 1.38 mi miles of 230 kV Line 217 from Varina to Charles City with 2-768.2 ACSS 250 C |
Dec 01 2024 | $3,967,500 |
AE2-123, AE2-124, AE2-270, AE2-313, AF1-123, AF1-124, AF1-125, AF1-128, AF2-042, AF2-065, AG1-011, AG1-075, AG1-178, AG1-184 |
|
|||||
Dominion | n8239 / dom-300 |
Rebuild 9.46 miles of 230 kV Line 217 from Chesterfield to Varina with 2-768.2 ACSS 250 C |
Dec 01 2024 | $14,190,000 |
AE2-123, AE2-124, AE2-270, AE2-313, AF1-123, AF1-124, AF1-125, AF1-128, AF2-042, AF2-065, AG1-011, AG1-075, AG1-178, AG1-184 |
|
|||||
Dominion | n8243 / dom-389 |
Rebuild 4.01 miles of 230 kV Line 2027 from Powhatan to AC2-165 Tap |
Dec 01 2024 | $11,528,750 |
AF1-293, AF1-323, AF2-042, AF2-171, AF2-222, AF2-397, AG1-030, AG1-098, AG1-181, AG1-284, AG1-285, AG1-427, AG1-432, AG1-505, AG1-506 |
|
|||||
Dominion | n8245 / dom-523 |
Reconductor 115 kV Line #31 from Otter River to Altavista |
Dec 01 2024 | $805,000 |
AE1-148, AE2-291, AE2-292, AF2-042, AF2-171, AF2-222, AF2-297, AG1-030, AG1-098, AG1-105, AG1-181, AG1-285, AG1-342, AG1-427, AG1-432, AG1-440, AG1-441, AG1-505, AG1-506, AG1-539 |
AG1-185 |
|||||
Dominion | n8248 / dom-383 |
Reconductor 0.94 miles of 115 kV Line 69 from Frog Lick to Reams D.P. with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
Dec 01 2024 | $1,222,000 |
AE2-250, AG1-075, AG1-393 |
|
|||||
Dominion | n8250 / dom-527 |
Wreck and Rebuild both line 1&2 from Thelma to Lakeview. |
Dec 01 2024 | $30,000,000 |
AG1-106 |
|
|||||
Dominion | n8256 / dom-277 |
Rebuild 230 kV Line #2027 from Carterville to AC2-165 Tap. |
Dec 01 2024 | $22,051,250 |
AF1-293, AF1-323, AF2-042, AF2-171, AF2-222, AF2-397, AG1-030, AG1-098, AG1-181, AG1-284, AG1-285, AG1-427, AG1-432, AG1-505, AG1-506 |
|
|||||
Dominion | n8260 / dom-457 |
Replace Wave Traps at Surry and Septa |
Dec 01 2024 | $600,000 |
AE2-123, AE2-313, AF1-123, AF1-124, AF1-125, AF2-042, AG1-178, AG1-184, AG1-449 |
|
|||||
Dominion | n8267 / dom-263 |
Reconductor 9.4 miles of 115 kV line 193 from Kerr DP to Kerr Dam with 768 ACSS @ 250 C. |
Dec 01 2024 | $19,740,000 |
AE1-148, AE2-053, AF2-171, AF2-222, AF2-297, AG1-030, AG1-105, AG1-181, AG1-185, AG1-285, AG1-342, AG1-427, AG1-432, AG1-440, AG1-441, AG1-445, AG1-446 |
AF1-294, AF2-115, AG1-179, AG1-272, AG1-273, AG1-274, AG1-384, AG1-428 |
|||||
Dominion | n8269 / dom-262 |
Reconductor 115 kV line 193 from Kerr DP to Island Creek DP. |
Dec 01 2024 | $2,847,000 |
AF2-171, AF2-222, AF2-297, AG1-030, AG1-105, AG1-181, AG1-185, AG1-285, AG1-342, AG1-427, AG1-432 |
AF1-294, AF2-115, AG1-179, AG1-272, AG1-273, AG1-274, AG1-384, AG1-428 |
|||||
Dominion | n8270 / dom-332 |
Reconductor 0.39 miles of 115 kV Line 193 from Clarksville to Buggs Island P.S. with (1) 768.2 ACSS |
Dec 01 2024 | $819,000 |
AF2-171, AF2-222, AF2-297, AG1-030, AG1-105, AG1-181, AG1-185, AG1-285, AG1-342, AG1-427, AG1-432 |
AF1-294, AF2-115, AG1-179, AG1-272, AG1-273, AG1-274, AG1-384, AG1-428 |
|||||
Dominion | n8271 / dom-333 |
Reconductor 5.28 miles of 115 kV Line 193 from Clarksville to Island Creek D.P with 768.2 ACSS 250 C |
Dec 01 2024 | $7,176,000 |
AF2-171, AF2-222, AF2-297, AG1-030, AG1-105, AG1-181, AG1-185, AG1-285, AG1-342, AG1-427, AG1-432 |
AF1-294, AF2-115, AG1-179, AG1-272, AG1-273, AG1-274, AG1-384, AG1-428 |
|||||
Dominion | n8286 / dom-529 |
Wreck and Rebuild 2.16 miles of Line #93. |
Dec 01 2024 | $4,756,000 |
AF2-046, AG1-008, AG1-343, AG1-394 |
AF1-266 |
|||||
Dominion | n8288 / dom-489 |
Wreck and rebuild 18.67 miles of the line 2034 from Earleys to AG1-437. |
Dec 01 2024 | $56,676,250 |
AF2-047, AG1-437, AG1-438, AG1-442, AG1-443 |
|
|||||
Dominion | n8294 / dom-510 |
Rebuild 115 kV Line #31 from Grit to AE2-291 Tap. |
Dec 01 2024 | $20,527,500 |
AE1-148, AE2-291, AE2-292, AF2-042, AF2-171, AF2-222, AF2-297, AG1-030, AG1-098, AG1-105, AG1-181, AG1-285, AG1-342, AG1-427, AG1-432, AG1-440, AG1-441, AG1-505, AG1-506, AG1-539 |
AG1-185 |
|||||
Dominion | n8301 / dom-386 |
Rebuild 115 kV Line 2160 from AC1-189 Tap to Everetts. |
Dec 01 2024 | $22,815,000 |
AF2-080, AF2-324, AG1-439, AG1-444 |
|
|||||
Dominion | n8304 / dom-420 |
Rebuild 17.5 miles of 230 kV Line 214 from AG1-531 Tap to Winchester with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
Dec 01 2024 | $50,312,500 |
AE2-123, AE2-124, AE2-270, AF2-065, AG1-011, AG1-531 |
|
|||||
Dominion | n8305 / dom-471 |
Reconductor 115 kV Line #65 from Ocran to Whitestone. |
Dec 01 2024 | $1,729,000 |
AF2-120, AG1-135, AG1-146, AG1-147, AG1-536 |
|
|||||
Dominion | n8323 / dom-530 |
Wreck and rebuild 5.03 miles of 115 kV Line 140 from Newsoms to Handsom with 768.2 ACSS 250 C |
Dec 31 2024 | $10,563,000 |
AF2-046, AG1-008, AG1-343, AG1-394 |
|
|||||
Dominion | n8324 / dom-532 |
Wreck and rebuild 5.09 miles of 115 kV Line 140 from Southampton and Handsom DP with 768.2 ACSS 250 C |
30 to 36 Months | $10,689,000 |
AF2-046, AG1-008, AG1-343, AG1-394 |
|
|||||
Dominion | n8325 / dom-533 |
Wreck and rebuild 6.87 miles of 115 kV Line 136 from Earleys to Ahoskie with 768.2 ACSS 250 C. Replace Wave Trap at Earleys. Replace Line Switch at Ahoskie. |
30 to 36 Months | $15,017,000 |
AF2-046, AG1-008, AG1-082, AG1-083, AG1-343 |
AG1-394 |
|||||
Dominion | n8422 / dom-496 |
Reconductor 115 kV Line #1016 from Crystal Hill to Perth. |
Dec 01 2024 | $16,432,000 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
|
|||||
Dominion | n8423 / dom-119 |
Rebuild 0.5 miles of 115 kV Line 1016 from Crystal Hill DP to AC1-222 Tap |
Dec 01 2024 | $1,050,000 |
AE2-185, AE2-187, AE2-283, AE2-291, AE2-292, AG1-539, AG1-547 |
|
|||||
Dominion | n8424 / dom-423 |
Rebuild 5.7 miles of 230 kV Line 235 from Prince EDW to Briery with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. |
Dec 01 2024 | $16,387,500 |
AE1-148, AE2-291, AE2-292, AF2-042, AF2-297, AG1-098, AG1-105, AG1-427, AG1-440, AG1-441, AG1-505, AG1-506 |
|
|||||
Dominion | n8425 / dom-509 |
Rebuild 35.68 miles of 500 kV Line 544 from AE1-173 Tap to Suffolk with 3-1351.5 ACSR 110 C. |
Dec 01 2024 | $203,376,000 |
AE2-313, AF2-042, AG1-178, AG1-184, AG1-449, AG1-505, AG1-506 |
|
|||||
Dominion | n8487 |
Wreck and rebuild approximately 9.8 miles of 115 kV line #69 between Frog Lick and Sapony substations with 768.2 ACSS |
Mar 01 2027 | $20,580,000 |
AE2-250, AG1-075, AG1-393 |
|
|||||
Dominion | s2824 |
Rebuild 230 kV Line #2056 from Hornertown to Hathaway. |
Dec 31 2026 | $49,100,000 |
|
AF1-266, AF2-046, AG1-008, AG1-106, AG1-179, AG1-181, AG1-428 |
|||||
Dominion | s2825.1 |
Rebuild entire line#2167 Edgecombe NUG to Hathaway. |
TBD | $39,500,000 |
|
AF2-080, AF2-324, AG1-439, AG1-444 |
|||||
Dominion | s2825.2 |
Rebuild line #55 Tarboro to Hart Mills. |
TBD | $3,500,000 |
|
AF2-046, AF2-080, AF2-299, AF2-324, AG1-008, AG1-082, AG1-083, AG1-106, AG1-343, AG1-437, AG1-438, AG1-439, AG1-442, AG1-443, AG1-444, AG1-552 |
|||||
EKPC | (Pending) / EKPC-tc1-r0009a |
LGE/KU to address limiting element. |
TBD | $0 |
|
AG1-353, AG1-354, AG1-488 |
|||||
EKPC | (Pending) / EKPC-tc1-r0015b |
Replace the 636 MCM ACSR jumpers at the Marion County substation associated with the Marion County 161/138 kV transformer. |
12 to 15 Months | $70,000 |
AG1-353, AG1-354, AG1-488 |
|
|||||
EKPC | (Pending) / EKPC-tc1-r0016b |
Rebuild the 636 MCM ACSR portion (17.2 miles) of the Marion County-Casey County 161 kV line using 795 MCM ACSR conductor. |
24 to 30 Months | $19,870,000 |
AG1-488 |
|
|||||
EKPC | (Pending) / EKPC-tc1-r0019a |
Rebuild the Summer Shade EKPC-Summer Shade TVA 161 kV line (0.13 mile) using 556 MCM ACSR conductor. |
18 to 24 Months | $185,000 |
AG1-353, AG1-354, AG1-488 |
|
|||||
EKPC | (Pending) / EKPC-tc1-r0020a |
Re-conductor the EKPC portion of the Spurlock-Meldahl Dam 345 kV line (3.81 miles) using 954 MCM ACSS conductor. |
24 to 30 Months | $3,535,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-526 |
|
|||||
EKPC | (Pending) / EKPC-tc1-r0020c |
Increase the maximum operating temperature of the 954 MCM ACSS transmission line conductor (3.8 miles) in the Spurlock-Stuart 345 kV line to 392 degrees F. |
24 to 30 Months | $10,115,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-306, AG1-526 |
|
|||||
EKPC | (Pending) / EKPC-tc1-r0021a |
Rebuild the AE2-254 POI (South Lancaster)-Garrard County 69 kV line (1.78 miles) using 556 MCM ACSR conductor. |
18 to 24 Months | $1,615,000 |
AG1-488 |
|
|||||
EKPC | (Pending) / EKPC-tc1-r0022a |
Rebuild the AG1-354 TP-Summer Shade 161 kV line section (19.5 miles) using 556 MCM ACSS conductor. |
24 to 30 Months | $27,790,000 |
AG1-353, AG1-354, AG1-488 |
|
|||||
EKPC | (Pending) / N6460.4 |
Replace the bus conductors at the Longbranch substation |
12 to 18 Months | $875,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-526 |
AG1-306 |
|||||
EKPC | n5780.3 / EKPC-tc1-r0020b |
Replace the 1500A interconnection metering CTs at Spurlock Station with 2000A equipment. |
12 to 15 Months | $175,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-306, AG1-526 |
|
|||||
EKPC | n5780.4 / EKPC-tc1-r0020d |
Replace the 3000A wave trap at Spurlock Station associated with the Spurlock-Stuart 345 kV line with 3600A equipment. |
15 to 18 Months | $195,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-306, AG1-526 |
|
|||||
EKPC | n6232 / EKPC-tc1-r0003a |
Replace the 500 MCM copper jumpers at the Somerset substation using 750 MCM copper or equivalent |
Dec 31 2024 | $250,000 |
|
AG1-353, AG1-354, AG1-471, AG1-488 |
|||||
EKPC | n6232.1 / EKPC-tc1-r0003b |
Replace the 1200A interconnection metering CTs with 2000A equipment. |
Sep 25 2024 | $85,000 |
AG1-353, AG1-354, AG1-471, AG1-488 |
|
|||||
EKPC | n6460.3 |
Rebuild the EKPC portion of the Longbranch-Mt. Zion 138 kV line section using 954 MCM ACSS conductor (3.7 miles). |
0 to 22 Months | $5,415,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-526 |
AG1-306 |
|||||
EKPC | n6463.2 / EKPC-tc1-r0007b |
Upgrade jumpers associated with Boone 138 kV bus using 2-500 MCM 37 CU conductor or equivalent |
6 to 9 Months | $70,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-526 |
AG1-306 |
|||||
EKPC | n6463.3 / EKPC-tc1-r0007a |
Replace the 954 MCM ACSR line conductor in the Boone County-Longbranch 138 kV line with 795 MCM ACSS conductor (2.3 miles) |
18 to 24 Months | $2,870,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AE2-275, AE2-308, AF1-233, AF1-256, AF2-111, AF2-307, AF2-348, AF2-355, AG1-526 |
AG1-306 |
|||||
EKPC | n6480.1 / EKPC-tc1-r0002a |
Rebuild the Plumville-Murphysville 69 kV line section using 556 MCM ACSR conductor at 212 degrees F (9.9 miles) |
24 to 30 Months | $9,975,000 |
AE1-144, AE2-038, AF1-233, AF1-256 |
|
|||||
EKPC | n6831.1 / EKPC-tc1-r0017a |
Increase the maximum operating temperature of the 795 MCM ACSR conductor in the Marion County-Marion County Industrial Tap 161 kV line section to 212 degrees F. |
18 to 24 Months | $510,000 |
|
AG1-488 |
|||||
EKPC | n6832.2 / EKPC-tc1-r0016a |
Increase the maximum operating temperature of the 636 MCM ACSR conductor in the Marion County-Casey County 161 kV line section to 212 degrees F (17.2 miles) |
18 to 24 Months | $1,940,000 |
|
AG1-488 |
|||||
EKPC | n6833.1 / EKPC-tc1-r0011a |
Increase the maximum operating temperature of the 636 MCM ACSR conductor in the Casey County-Liberty Junction 161 kV line section to 212 degrees F. |
18 to 24 Months | $75,000 |
|
AG1-488 |
|||||
EKPC | n6834.1 / EKPC-tc1-r0001a |
Rebuild the 4/0 ACSR Green County-Summersville 69 kV line section (4.2 miles) using 556 MCM ACSR/TW. |
18 to 24 Months | $4,230,000 |
|
AG1-354, AG1-488 |
|||||
EKPC | n7617.1 / EKPC-tc1-r0010a |
Replace the 795 MCM ACSR line conductor in the Spurlock-Kenton 138 kV line with 954 MCM ACSR conductor (4.4 miles) |
24 to 28 Months | $5,230,000 |
AE1-144, AE2-038, AE2-138, AE2-210, AF1-233, AF1-256, AF2-111, AF2-348 |
|
|||||
EKPC | n7771.2 / EKPC-tc1-r0014a |
Increase the maximum operating temperature of the Laurel County-Laurel Dam 161 kV line section 795 MCM conductor to 212 degrees F (~4.47 miles) |
Sep 25 2024 | $1,035,000 |
|
AG1-471, AG1-488 |
|||||
EKPC | n7773.1 / EKPC-tc1-r0004b |
Change the 69 kV current transformer settings associated with circuit breaker S7-654 from 600A to at least 800A. |
Sep 25 2024 | $10,000 |
|
AG1-353, AG1-354, AG1-471, AG1-488 |
|||||
EKPC | n8352 / EKPC-tc1-r0018a |
Increase the maximum operating temperature of the 795 MCM ACSR conductor in the Marion County Industrial Park Tap-Saloma Tap 161 kV line section to 212 degrees F (11.59 miles) |
Dec 31 2024 | $1,210,000 |
AG1-488 |
|
|||||
EKPC | n8364.1 / EKPC-tc1-r0009b |
Replace the 636 MCM ACSR conductor in the Marion County-KU Lebanon 138 kV line with 954 MCM ACSS conductor. |
Dec 31 2024 | $185,000 |
AG1-353, AG1-354, AG1-488 |
|
|||||
EKPC | n8368.2 / EKPC-tc1-r0012b |
Rebuild the Cooper-Elihu 161 kV line section using 795 MCM ACSS conductor (4.2 miles) |
24 to 30 Months | $6,650,000 |
AG1-353, AG1-354, AG1-471, AG1-488 |
|
|||||
EKPC | n8368.3 / EKPC-tc1-r0012c |
Change the Zone 3 relay setting at Elihu substation associated with the line protection to at least 392 MVA LTE rating. |
6 Months | $10,000 |
AG1-353, AG1-354, AG1-471, AG1-488 |
|
|||||
EKPC | n8368.4 / EKPC-tc1-r0012d |
Upgrade the existing 795 MCM ACSR jumpers at the Cooper substation associated with the Cooper-Elihu 161 kV line using bundled 500 MCM CU or equivalent |
9 to 12 Months | $35,000 |
AG1-353, AG1-354, AG1-471, AG1-488 |
|
|||||
EKPC | n8369 / EKPC-tc1-r0015a |
Replace the existing Marion County 161/138 kV, 200 MVA transformer with a 300 MVA transformer. |
Dec 31 2024 | $9,610,000 |
AG1-353, AG1-354, AG1-488 |
|
|||||
EKPC | n8391 / EKPC-tc1-r0005b |
Rebuild the EKPC portion of the North Springfield-KU Springfield 69 kV line (2.6 mile) using 556 MCM ACSR conductor |
12 to 18 Months | $3,585,000 |
|
AG1-488 |
|||||
EKPC | n8396 / EKPC-tc1-r0013a |
Replace the existing Green County 161/69 kV, 93 MVA transformer with a 150 MVA transformer. |
Dec 31 2024 | $2,555,000 |
|
AG1-354, AG1-488 |
|||||
IPL | (Pending) / IPL_TC1_13514 |
Replace Fall Creek Circuit Breaker, Cts and Relay. |
12 to 18 Months | $738,000 |
AF1-221, AF2-068, AF2-173, AF2-177, AF2-335, AF2-388, AG1-225, AG1-367, AG1-375, AG1-433 |
|
|||||
IPL | (Pending) / IPL_TC1_15157 |
Reconductor this line to meet at minimum rating of 1624 MVA. |
TBD | $14,600,000 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
IPL | (Pending) / IPL_TC1_15158 |
Replace substation terminal equipment to meet at minimum rating of 1624 MVA |
TBD | $500,000 |
AE2-130, AF1-088, AF2-008, AG1-226, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
ITCT | (Pending) / ITCT_TC1_13819 |
Maple end rating limited by sag, 852/852 MVA. Remediate the sag limit. New MISO SE rating 1758 MVA. |
TBD | $625,000 |
|
AF1-176, AF2-396 |
|||||
ITCT | (Pending) / ITCT_TC1_15156 |
Reconductor Monroe-J2486 Line |
TBD | $12,850,000 |
AF1-176, AF2-396, AG1-298 |
|
|||||
JCPL | (Pending) / TC1-PH1-001 |
Reconductor Oyster Creek - Manitou #1 230 kV Line. Terminal Upgrades. |
29 to 31 Months | $45,903,114 |
AF2-016, AF2-021 |
|
|||||
JCPL | (Pending) / TC1-PH1-002 |
Reconductor Oyster Creek - Manitou #2 230 kV Line. Terminal Upgrades. |
29 to 31 Months | $45,903,114 |
AF2-016, AF2-021 |
|
|||||
JCPL | n6587 |
Reconductor 0.08 miles of Oyster creek – Cedar 230 kV Line transmission line. Upgrade Cedar Terminal at Oyster Creek 230 kV Sub (Securitized by AE1-020). |
16 Months | $645,190 |
|
AF2-016, AF2-021 |
|||||
LGEE | (Pending) / LGEE_TC1_13411 |
Build new 345kV substation in Clark CO, IN by tapping the existing Trimble-Speed & Trimble-Ghent 345kV line near Miles Rd. Build new 345kV line between new 345kV station and OVEC Clifty Creek 345kV. |
36 to 48 Months | $90,000,000 |
|
AE2-130, AE2-138, AF1-088, AF2-008, AF2-355, AG1-526 |
|||||
LGEE | (Pending) / LGEE_TC1_15505 |
Reconductor Springfield-N Springfiled (EKPC) 69kV (3.24 miles) with a minimum of 397.5 MCM 26X7 ACSR and upgrade terminal equipment. |
0 to 36 Months | $4,500,000 |
|
AG1-353, AG1-488 |
|||||
LGEE | (Pending) / LGEE_TC1_15510 |
Upgrade terminal equipment at Elihu 161kV associated with the Elihu-Cooper (EKPC) 161kV line to a minimum SE rating of 1200 amps. |
TBD | $100,000 |
|
AG1-353, AG1-354, AG1-471, AG1-488 |
|||||
LS Power | n7800 / SR003 |
SR003: Replace terminal jumpers. |
12 Months | $30,000 |
AF2-193, AF2-194, AF2-358, AG1-061, AG1-450, AG1-497, AG1-529 |
|
|||||
NIPS | (Pending) / NIPS_TC1_15151 |
NIPS SN/SE ratings of 1538/1877 MVA achieved by change out of 2156 ACSR line conductor with 2-1590 ACSR conductor and change out of 2156 ACSR conductor drop with 3000 AL conductor |
TBD | $6,200,000 |
AE1-172, AF1-200, AF1-314, AF1-318, AG1-121 |
|
|||||
NIPS | (Pending) / NIPS_TC1_15152 |
NIPS SN/SE ratings of 2133/2577 MVA achieved by change out of 2156 ACSR line conductor with 2-1590 ACSR conductor. |
TBD | $1,800,000 |
AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-392, AF2-441, AG1-121, AG1-298, AG1-434, AG1-435, AG1-553 |
|
|||||
NIPS | (Pending) / NIPS_TC1_15480 |
Station equipment upgrade and reconductor to achieve NIPS SN/SE ratings of 2807/2807. |
TBD | $12,700,000 |
|
AE1-070, AE2-223, AF1-200, AF1-296, AF1-318, AF2-041, AF2-182, AF2-349, AF2-441, AG1-118, AG1-119, AG1-121, AG1-298, AG1-379, AG1-435, AG1-535, AG1-553 |
|||||
NIPS | b3775.8 |
Upgrade existing terminal equipment at St. John on the existing Crete to St. John 345 kV line |
Dec 01 2026 | $0 |
|
AE1-070, AE1-172, AF1-200, AF1-296, AF1-318, AF2-041, AF2-182, AF2-349, AF2-392, AG1-118, AG1-119, AG1-121, AG1-298, AG1-379, AG1-435, AG1-553 |
|||||
NIPS | b3775.9 |
Upgrade existing terminal equipment (substation conductor) at Green Acres on the St. John to Green Acres 345 kV lin |
Dec 01 2026 | $0 |
|
AE1-070, AE1-172, AF1-200, AF1-296, AF1-314, AF1-318, AF2-349, AF2-392, AF2-441, AG1-118, AG1-119, AG1-121, AG1-298, AG1-379, AG1-434, AG1-435, AG1-553 |
|||||
NYISO | (Pending) / NYISO_CY17_13387 |
East Sayre-North Waverly 115kV line upgrade - NYSEG (NYISO CY17 driven upgrade) |
32 Months | $10,525,000 |
|
AF2-406, AF2-412 |
|||||
NextEra | b3775.2 |
Reconductor NEET’s section of Crete(IN/IL border)-St. John 345 kV line (6.95 miles). |
May 09 2023 | $0 |
|
AE1-070, AE1-172, AF1-200, AF1-296, AF1-318, AF2-041, AF2-182, AF2-349, AF2-392, AG1-118, AG1-119, AG1-121, AG1-298, AG1-379, AG1-435, AG1-553 |
|||||
OVEC | (Pending) / OVECPJH01 |
Replace 5" Al Tubing 345 kV bus at Clifty Creek |
18 to 24 Months | $500,000 |
AE2-130, AE2-261, AF1-088, AF1-200, AF1-204, AF2-008, AF2-096, AG1-226, AG1-298, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
OVEC | (Pending) / OVECPJH03 |
Sag study Clifty Creek-Dearborn |
24 to 36 Months | $253,200 |
AE2-130, AF1-088, AF2-008, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
OVEC | (Pending) / OVECPJH04 |
Replace two (2) 1600 A switches at Dearborn |
18 to 24 Months | $800,000 |
AE2-130, AF1-088, AF2-008, AG1-522, AG1-523, AG1-524, AG1-525 |
|
|||||
OVEC | b3788.2 / B3788 |
Replace limiting station elements at Kyger Creek |
Jun 01 2028 | $0 |
|
AE2-130, AF1-088, AF1-204, AF2-008, AF2-111, AF2-348, AF2-407, AG1-297 |
|||||
OVEC | n4106 / N4106 |
Replace Two (2) Switches at the Clifty Creek 345 kV Station |
18 to 24 Months | $536,791 |
|
AE2-130, AE2-261, AF1-088, AF1-200, AF2-008, AF2-096, AG1-226, AG1-298, AG1-522, AG1-523, AG1-524, AG1-525 |
|||||
OVEC | n6759.2 / OVEC0001b |
Replace 2 1600 A switches at Dearborn 345 kV and 4 1600 A switches at Pierce 345kV |
18 to 24 Months | $11,700,000 |
AF1-221, AF2-068, AF2-173, AF2-177, AF2-388, AF2-407, AG1-224, AG1-225, AG1-297, AG1-367, AG1-375 |
|
|||||
OVEC | n7881 / OVEC0001a |
Replace 16 tangent structures, 3 dead end structures, and conductor over one Ohio river crossing |
24 to 36 Months | $14,979,900 |
AF1-221, AF2-068, AF2-173, AF2-177, AF2-388, AF2-407, AG1-224, AG1-225, AG1-297, AG1-367, AG1-375 |
|
|||||
OVEC | n8358.1 / OVECI0024b |
Replace 4 1600 A switches at Dearborn 345 kV |
18 to 24 Months | $520,000 |
|
AG1-225, AG1-297, AG1-367, AG1-375, AG1-433 |
|||||
OVEC | n8358.2 / OVEC0002b |
Replace Dearborn 345 kV Bus (Sub Cond 2870 MCM ACSR) |
18 to 24 Months | $1,000,000 |
AF1-221, AF2-068, AF2-173, AF2-177, AF2-335, AF2-388, AF2-407, AG1-224, AG1-225, AG1-297, AG1-367, AG1-375, AG1-433 |
|
|||||
OVEC | n8358.3 / OVECI0024d |
Replace Dearborn 2500 Amp Wave Traps |
18 to 24 Months | $260,000 |
AF1-221, AF2-068, AF2-173, AF2-177, AF2-335, AF2-388, AF2-407, AG1-224, AG1-225, AG1-297, AG1-367, AG1-375, AG1-433 |
|
|||||
OVEC | n8358.4 / OVECI0024e |
Replace 2 Dearborn 3000 Amp Circuit Breakers |
24 to 36 Months | $5,200,000 |
AF1-221, AF2-068, AF2-173, AF2-177, AF2-335, AF2-388, AF2-407, AG1-224, AG1-225, AG1-297, AG1-367, AG1-375, AG1-433 |
|
|||||
PECO | (Pending) / 220-97 Upgrades |
Reinforcement for LINWOOD97 230 KV to POST97 230 KV ckt 1 |
48 Months | $19,750,000 |
AF2-193, AF2-194 |
|
|||||
PECO | (Pending) / Chichester1 |
Chichester substation reinforcement |
24 to 36 Months | $750,000 |
AF2-193, AF2-194, AG1-061, AG1-497 |
|
|||||
PECO | (Pending) / b3800-5014/5034 |
PECO Baseline series b3800 required. (b3800.5, b3800.31, b3800.35, b3800.42, b3800.44-b3800.47,b3800.52) |
60 Months | $0 |
|
AF2-016, AF2-193, AF2-194, AF2-358, AG1-061, AG1-497 |
|||||
PECO | b3780.2 |
Peach Bottom to Graceton (PECO Portion) – New 500kV Line |
Dec 31 2027 | $48,000,000 |
|
AF2-193, AF2-194, AG1-497 |
|||||
PECO | n7159 / pe023 |
Reconductor 2 miles of 230 kV line from Chichester to Trainer with 2x1590 kcmil 54/19 ACSR and substation work at Chichester and Trainer. |
Oct 31 2026 | $11,900,000 |
AF2-193, AF2-194 |
|
|||||
PECO | n7866 / pe042 |
Reconductor Linwood - Chichester 230 kV line. At Chichester: Upgrade #43 reactor. |
Oct 31 2026 | $5,250,000 |
AF2-193, AF2-194 |
|
|||||
PENELEC | (Pending) / PN-2023-030 (Supplemental) |
Replace the existing Shawville 1A Transformer (Projected ISD 12/31/2025) |
TBD | $8,800,000 |
|
AF1-099, AF1-100, AF1-142, AF2-121, AF2-296, AG1-090, AG1-308, AG1-377, AG1-378 |
|||||
PENELEC | (Pending) / PN-2024-007 (Supplemental) |
Replace Homer City South 345/230-23kV Transformer (Projected ISD 6/1/2027) |
TBD | $19,100,000 |
|
AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF2-164, AF2-406, AF2-412, AG1-548 |
|||||
PENELEC | (Pending) / PN-AF1-F-0022 |
Replace substation conductor at Shawville |
6 Months | $515,901 |
AF2-121, AG1-090, AG1-308, AG1-377, AG1-378 |
|
|||||
PENELEC | (Pending) / PN-AG1-0030A |
Reconductor 14.4 miles of line of the Tyrone North - Westfall 115kV line. |
60 Months | $35,300,000 |
AF2-121, AG1-090, AG1-308, AG1-377, AG1-378 |
|
|||||
PENELEC | b3751 |
Rebuild 6.4 miles of the Roxbury - Shade Gap 115 kV line from Roxbury to the AE1-071 115 kV ring bus with single circuit 115 kV construction (Projected ISD 6/1/2027) |
TBD | $15,030,000 |
|
AF1-099, AF1-100, AF1-142, AF1-306, AF2-050, AG1-090, AG1-473 |
|||||
PENELEC | n6506.1 |
Reconductor 4.62 miles of transmission line. Replace line drops at Four Mile and Erie South substations |
26 to 28 Months | $16,942,702 |
|
AF1-276, AF1-277, AF1-278, AF1-306, AF2-406, AF2-412, AG1-391, AG1-392 |
|||||
PENELEC | n6816.1 |
Rebuild 11.84 miles of the Lewistown - Reeds Gap Switching Station 115 kV Line |
32 to 34 Months | $40,857,487 |
AF1-099, AF1-100, AF1-142, AF1-306, AG1-090, AG1-473 |
AF2-050 |
|||||
PENELEC | n6816.2 |
Rebuild 0.18 miles of line and replace line drop at Reed Gap Switching Station. |
18 Months | $650,000 |
AF1-099, AF1-100, AF1-142, AF1-306, AG1-090, AG1-473 |
AF2-050 |
|||||
PENELEC | n6817.1 |
Rebuild 24.59 miles of the Lewistown-Juniata 230kV transmission line |
49 to 51 Months | $127,043,034 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-050, AF2-381, AG1-090, AG1-257, AG1-473 |
|
|||||
PENELEC | n6820.1 |
Rebuild 22.36 miles of the Shade Gap to Reeds Gap Switching Station 115kV line |
41 to 43 Months | $77,159,917 |
AF1-099, AF1-100, AF1-142, AF1-306, AG1-090, AG1-473 |
AF2-050, AG1-257 |
|||||
PENELEC | n6855.1 |
Replace substation conductor at Warren and Glade substations |
25 to 27 Months | $402,846 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-412, AG1-090, AG1-473 |
|
|||||
PENELEC | n6855.2 |
Rebuild 11.53 miles of transmission line between Warren and Glade. |
35 to 37 Months | $59,569,182 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-412, AG1-090, AG1-473 |
|
|||||
PENELEC | n7114.1 |
Reconductor 5.6 miles of 115 kV line between AE2-113 Tap and Farmers Valley |
26 to 28 Months | $20,934,861 |
AF1-099, AF1-100, AF1-142, AF1-306, AG1-090 |
|
|||||
PENELEC | n7127.2 |
Reconductor 13.01 miles of the East Towanda - Canyon 230 kV Line. Replace transmission line drop at East Towanda. |
32 to 34 Months | $89,224,154 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-406, AF2-412, AG1-090, AG1-391, AG1-392, AG1-473, AG1-548 |
|
|||||
PENELEC | n7127.3 |
Replace disconnect switch at Canyon |
31 to 33 Months | $1,056,970 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-406, AF2-412, AG1-090, AG1-391, AG1-392, AG1-473, AG1-548 |
|
|||||
PENELEC | n7127.4 |
Replace line trap at East Towanda |
12 Months | $225,000 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-406, AF2-412, AG1-090, AG1-391, AG1-392, AG1-473, AG1-548 |
|
|||||
PENELEC | n7132.1 |
Construct a new 230 kV circuit (approximately 27 miles) between North Meshoppen and Lackawanna 230 kV. |
43 to 45 Months | $179,206,462 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-406, AF2-412, AG1-090 |
|
|||||
PENELEC | n7605 |
Reconductor 9.24 miles of the Canyon - North Meshoppen 230 kV Line |
27 to 29 Months | $27,029,524 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-406, AF2-412, AG1-090, AG1-391, AG1-392, AG1-473, AG1-548 |
|
|||||
PENELEC | n7606 |
Replace disconnect switch at Canyon |
31 to 33 Months | $1,056,970 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-406, AF2-412, AG1-090, AG1-391, AG1-392, AG1-473, AG1-548 |
|
|||||
PENELEC | n7652 |
Replace line trap at Shawville. |
22 to 24 Months | $259,900 |
AF1-099, AF1-100, AF1-142, AG1-090 |
AF2-121, AF2-296, AG1-308, AG1-377, AG1-378, AG1-473 |
|||||
PENELEC | n7763.2 |
Adjust relay settings at Roxbury 115kV Substation |
12 Months | $917,100 |
AF1-099, AF1-100, AF1-142, AF1-306, AG1-090, AG1-473 |
AF2-050 |
|||||
PENELEC | n8096 |
Install an additional 230kV circuit breaker between the East Towanda 230kV line terminal and the North Meshoppen 230/115kV #4 transformer. |
54 to 56 Months | $2,899,462 |
AF1-276, AF1-277, AF1-278, AF2-406, AF2-412, AG1-391, AG1-392 |
|
|||||
PENELEC | n8112 |
Reconductor/rebuild the Homer City - Shelocta 230 kV (~11 miles) |
35 to 37 Months | $56,830,963 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8112.1 |
Adjust/replace relays at Homer City and Shelocta substations. |
23 to 25 Months | $2,668,506 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8112.2 |
Replace disconnect switches and substation conductor at Homer City Substation. |
31 to 33 Months | $3,333,312 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8112.3 |
Replace disconnect switches and leads at Shelocta Substation |
31 to 33 Months | $1,744,708 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8192 |
Reconductor/rebuild the Shelocta - Keystone 230 kV line (~2.5 miles) |
28 to 30 Months | $17,145,302 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8192.1 |
Adjust/replace relaying at Keystone and Shelocta substations. |
23 to 25 Months | $2,668,506 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8192.2 |
Replace substation conductor at Keystone substation |
25 to 27 Months | $1,142,812 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8192.3 |
Replace line drops at Keystone Substation |
25 to 27 Months | $430,625 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8192.4 |
Replace bus conductor at Keystone Substation |
20 Months | $1,142,812 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8192.5 |
Replace disconnect switches at Keystone Substation |
20 Months | $2,629,706 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8192.6 |
Replace breaker leads at Keystone Substation |
18 Months | $430,625 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8192.7 |
Replace disconnect switches and leads at Shelocta Substation |
24 Months | $1,744,708 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8219 |
Reconductor 13.9 miles of transmission line on the AG1-473 (Shingletown) - Lewistown 230 kV Line. |
Jun 01 2024 | $59,790,000 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-406, AF2-412, AG1-090, AG1-473 |
|
|||||
PENELEC | n8229 |
Reconductor 18.7 miles the AE2-113 (Farmers Valley) - Ridgway 115 kV Line |
Jun 01 2024 | $69,907,482 |
AF1-276, AF1-277, AF1-278, AF2-412, AG1-389, AG1-390, AG1-391, AG1-392 |
|
|||||
PENELEC | n8281 |
Replace the Keystone #4 500/230 kV transformer with a larger unit and install a high side breaker |
62 to 64 Months | $41,580,000 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-010, AF2-050, AF2-164, AF2-381, AF2-406, AF2-412, AG1-090, AG1-548, AG1-549 |
|
|||||
PENELEC | n8328 |
Shelocta 230kV: Convert station to double breaker double bus |
60 to 62 Months | $16,472,562 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-050, AF2-164, AF2-381, AF2-412, AG1-090, AG1-548 |
|
|||||
PENELEC | n8471 |
East Sayre-North Waverly 115kV line upgrade - FirstEnergy (NYISO CY17 driven upgrade) |
24 to 26 Months | $1,417,388 |
|
AF2-406, AF2-412 |
|||||
PENELEC | s2053 |
Replace the Homer City North 345/230-23 kV transformer with three (3) single phase units (Projected ISD 12/15/2023) |
TBD | $17,700,000 |
|
AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF2-164, AF2-406, AF2-412, AG1-548 |
|||||
PENELEC | s2964 |
Replace circuit breaker, wave trap, and relaying at Shawville (Projected ISD 12/8/2023) |
Nov 06 2024 | $1,050,000 |
|
AF1-100, AF2-121, AG1-090, AG1-308, AG1-377, AG1-378 |
|||||
PEPCO | (Pending) |
PEPCO b3800 series (b3800.243, b3800.244, b3800.245) |
72 to 80 Months | $0 |
|
AG1-483 |
|||||
PPL | (Pending) / R-PL-0003 |
Rebuild FRAC-SIEG 230kV Line |
72 Months | $120,600,000 |
AF2-056, AG1-060 |
|
|||||
PPL | (Pending) / R-PL-0014 - Alternate |
Separate the Gen1 lead line from GLBR-SUSQ. Replace 13 structures with two pole dead-end structures. |
36 Months | $9,750,000 |
AF2-056, AG1-060 |
|
|||||
PPL | b3730 |
Reterminate the Lackawanna T3 and T4 500 / 230 kV transformers on the 230 kV side |
Dec 31 2025 | $10,700,000 |
|
AF2-406, AF2-412 |
|||||
PPL | n6818 |
Rebuild PPL's ~0.9 miles LEWI-JUNI 230kV Line with a summer normal rating of at least 3000 Amps. |
24 Months | $3,600,000 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-050, AF2-381, AG1-090, AG1-257, AG1-473 |
|
|||||
PPL | n7111 / R-PL-0005 |
Rebuild SUNB-ELIM 230kV line. |
48 Months | $77,100,000 |
AF2-056, AG1-277 |
|
|||||
PPL | n7132.2 |
Install a new 230kV terminal at LACK 230kV yard for First Energy's new North Meshoppen-Lackawanna #2 230 kV line. |
24 Months | $2,100,000 |
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-406, AF2-412, AG1-090 |
|
|||||
PPL | n7497 / R-PL-0026 |
Re-terminate the SUNB 500/230 kV Transformers at Sunbury. |
36 Months | $35,100,000 |
AF2-056, AG1-060 |
|
|||||
PPL | s0945.1 |
Rebuild the Juniata 230/69 kV Substation (Projected ISD 12/15/2026) |
Dec 15 2026 | $36,000,000 |
|
AF1-099, AF1-100, AF1-142, AF1-276, AF1-277, AF1-278, AF1-306, AF2-050, AF2-381, AG1-090, AG1-257, AG1-473 |
|||||
PSEG | (Pending) / PSEG-TC1_PH1_03-29-24 |
Transmission Line Drop Reinforcement at New Freedom for CARDIFF 230 KV to NEWFRDM 230 KV ckt 1 |
12 to 18 Months | $457,000 |
AF1-238, AF2-016, AF2-021 |
|
|||||
PSEG | (Pending) / r_PS_AE2_FES_09_Nfreed |
Replace Line Drops |
1 Months | $93,191 |
AF1-238, AF2-016, AF2-021 |
|
|||||
PSEG | n8310 / N8310 |
Replacement of PSEG equipment for the 2310 line termination at New Freedom Switching Station to accomodate AEC rebuild - n6342. (Secured by AE2-022) |
Jun 01 2029 | $2,730,000 |
|
AF2-016, AF2-021 |
|||||
TVA | (Pending) / TVA_TC1_15534 |
Replace breaker 924 and 944, switches 929, 943, 945, 947, 949 , 923 and 925, and line CT to a minimum of 2,000 amps. |
TBD | $8,200,000 |
|
AG1-353, AG1-354, AG1-488 |
|||||
WEC | (Pending) |
New switching station "ROSECRANS" (required for MISO DPP 2020) |
72 Months | $51,900,000 |
|
AF2-182, AG1-462, AG1-553 |
[1]Winter load flow analysis will be performed starting in Transition Cycle #2.
[2]State - The state in which the generator or merchant transmission facility is located.
[3]The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Note: Additional detail can be found in each of the individual TC1 New Service Request System Impact Study reports also available on PJM.com.