Transition Cycle 2 Phase I

Introduction

This Phase I System Impact Study executive summary report has been prepared in accordance with the PJM Open Access Transmission Tariff Part VII, Subpart D, section 309. This report presents an executive summary of Phase I System Impact Study results for New Service Requests (projects) in Transition Cycle 2.

Preface

The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:

  1. PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
  2. PJM will only perform load flow analysis during the Phase I System Impact Study.
  3. In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Requests with Affected System impacts and provides each Affected System Operator with a list of New Service Requests in the Cycle with potential impacts to their respective system.
  4. PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
  5. The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.

New Services Request List

PJM received 450 New Service Requests in Transition Cycle 2, Phase I with a combined Maximum Facility Output (MFO) of 45,977.6 MW and 33,857.2 MW as Capacity Interconnection Rights (CIRs). All of these New Service Requests are listed in table below.

Project IDProject Name / POI
State
Status
Transmission Owner
Maxiumum Facility Output (MFO in MW)MW Energy (MWE)MW Capacity (MWC)Project TypeResource Type
AG2-005Garner DP-Lancaster 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)196.020.08.4Generation InterconnectionSolar
AG2-010Peninsula-Whealton 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.075.96Generation InterconnectionStorage
AG2-014Meadow Lake 345 kVIndianaActiveAmerican Electric Power50.050.020.0Generation InterconnectionStorage
AG2-016Oyster Creek-Whitings 34.5 kVNew JerseyActiveJersey Central Power & Light Company19.819.88.316Generation InterconnectionSolar
AG2-029Forest G. Hipple-Collingwood 345 kVIndianaActiveAmerican Electric Power300.0300.039.0Generation InterconnectionSolar
AG2-037Findlay-Midfield 23 kVPennsylvaniaActiveDuquesne Light Company4.74.72.82Generation InterconnectionSolar
AG2-049Van Dorn 34.5 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.00.020.0Generation InterconnectionBiomass
AG2-057Cardington-Liberty 69 kV IIOhioActiveAmerican Transmission Systems, Incorporated74.010.06.0Generation InterconnectionSolar
AG2-061Dana 345 kVIllinoisActiveCommonwealth Edison Company200.050.020.0Generation InterconnectionStorage
AG2-062William 138 kVWest VirginiaActiveThe Potomac Edison Company147.0147.021.609Generation InterconnectionWind
AG2-063North Hampton 69 kVOhioActiveAmerican Transmission Systems, Incorporated54.054.034.5Generation InterconnectionSolar
AG2-068Heritage - Wake 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.060.0Generation InterconnectionSolar
AG2-069Heritage - Wake 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)250.0150.090.0Generation InterconnectionSolar
AG2-072Rockport 765 kVIndianaActiveAmerican Electric Power700.0700.0700.0Generation InterconnectionNatural Gas
AG2-073Crooksville 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.100.0100.060.0Generation InterconnectionSolar
AG2-074Meckesville Tap 69kVPennsylvaniaActivePPL Electric Utilities Corporation38.038.026.2Generation InterconnectionSolar
AG2-077Clover-Rawlings 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)700.0200.0120.0Generation InterconnectionSolar
AG2-081Mt. Sterling-Fogg Pike 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.30.030.018.0Generation InterconnectionSolar
AG2-082Nottingham 138 kVOhioActiveAmerican Electric Power200.0200.0133.4Generation InterconnectionSolar
AG2-085Delaware-Royerton 138 kVIndianaActiveAmerican Electric Power140.040.024.0Generation InterconnectionSolar
AG2-086Mt. Jackson DP-Mt. Jackson 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)75.075.045.0Generation InterconnectionSolar; Storage
AG2-088Midlothian 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)150.0150.0150.0Generation InterconnectionStorage
AG2-090Scalp Level 23 kV IVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC14.014.08.4Generation InterconnectionSolar
AG2-091Scalp Level 23 kV VPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.06.03.6Generation InterconnectionSolar
AG2-093Colonial Trail-Hopewell 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.0100.0Generation InterconnectionSolar; Storage
AG2-095Hopewell 34.5 kV (Circuit 313)VirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)18.018.010.8Generation InterconnectionSolar
AG2-104Marysville-Flatlick 765 kVOhioActiveAmerican Electric Power400.0400.0253.7Generation InterconnectionSolar
AG2-106Marysville-Flatlick 765 kVOhioActiveAmerican Electric Power400.00.0150.0Generation InterconnectionStorage
AG2-107Marysville-Flatlick 765 kVOhioActiveAmerican Electric Power400.00.0150.0Generation InterconnectionStorage
AG2-109Fitchville-New London 69 kVOhioActiveAmerican Transmission Systems, Incorporated40.040.028.1Generation InterconnectionSolar
AG2-111Perth 34.5 kV Substation (Circuit 408)VirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)14.514.58.7Generation InterconnectionSolar
AG2-112Perth 34.5 kV Substation (Circuit 404)VirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)15.215.29.12Generation InterconnectionSolar
AG2-114Dresden-Pontiac Midpoint 345 kVIllinoisActiveCommonwealth Edison Company100.0100.060.0Generation InterconnectionSolar
AG2-119Galion-Roberts South 138 kV IIOhioActiveAmerican Transmission Systems, Incorporated80.080.053.6Generation InterconnectionSolar
AG2-120Everetts 34.5 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)21.021.014.0Generation InterconnectionSolar
AG2-121Mackeys 230 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)140.00.00.0Generation InterconnectionStorage
AG2-124Shackleford-Harmony 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)149.90.033.34Generation InterconnectionSolar
AG2-125Camden-Crystal 69 kVOhioActiveThe Dayton Power and Light Company69.90.015.44Generation InterconnectionSolar
AG2-126Eugene 345 kVIndianaActiveAmerican Electric Power150.0150.090.0Generation InterconnectionSolar; Storage
AG2-148S Berwick - Galion 345 kVOhioActiveAmerican Electric Power86.086.00.0Generation InterconnectionStorage
AG2-149Galion-South Berwick 345 kVOhioActiveAmerican Electric Power400.0314.052.0Generation InterconnectionSolar
AG2-151Trices Lake - James River Tap 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.060.0Generation InterconnectionSolar
AG2-152Banister-Bear Skin 138 kVVirginiaActiveAmerican Electric Power131.0131.079.0Generation InterconnectionSolar
AG2-159Williamstown 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.61.061.057.6Generation InterconnectionSolar; Storage
AG2-161Wheelabrator Frackville-Gilberton 69 kVPennsylvaniaActivePPL Electric Utilities Corporation43.043.018.06Generation InterconnectionSolar
AG2-162Jefferson-Greentown 765 kVIndianaActiveAmerican Electric Power115.0115.015.0Generation InterconnectionSolar
AG2-163Dequine-Eugene 345 kVIndianaActiveAmerican Electric Power700.0250.035.0Generation InterconnectionSolar
AG2-164Jefferson-Greentown 765 kVIndianaActiveAmerican Electric Power385.0270.035.1Generation InterconnectionSolar
AG2-165Dumont-Greentown 765 kVIndianaActiveAmerican Electric Power200.0200.026.0Generation InterconnectionSolar
AG2-166Newville-Nottingham Tap 1 69 kVPennsylvaniaActivePPL Electric Utilities Corporation10.010.00.0Generation InterconnectionSolar
AG2-171Lunenburg-Nutbush 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)60.060.036.0Generation InterconnectionSolar
AG2-176Geneva 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC150.0150.090.0Generation InterconnectionSolar
AG2-179Sewellton Junction 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.60.060.057.0Generation InterconnectionSolar; Storage
AG2-181Airey - Golden Hill 69 kVMarylandActiveDelmarva Power and Light Company28.028.02.8Generation InterconnectionSolar
AG2-182Doubs-Bismark 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)200.0200.0133.3333Generation InterconnectionSolar; Storage
AG2-184Harbert Metering 138 kVKentuckyActiveAmerican Electric Power210.0210.0126.0Generation InterconnectionSolar
AG2-188Farmville - Buckingham 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)140.0140.089.0Generation InterconnectionSolar
AG2-191Mississinewa 138 kVIndianaActiveAmerican Electric Power30.030.018.0Generation InterconnectionSolar; Storage
AG2-192Mississinewa 138 kVIndianaActiveAmerican Electric Power19.019.011.4Generation InterconnectionSolar; Storage
AG2-193Turner 34.5 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.012.0Generation InterconnectionSolar
AG2-198Briery - Finneywood 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)80.080.048.0Generation InterconnectionSolar
AG2-200North Warren–Russell 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.020.012.0Generation InterconnectionSolar
AG2-206Tennessee Gas-East Towanda 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC48.048.028.8Generation InterconnectionSolar
AG2-208Greenwood DP - St. Johns DP 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)70.070.044.47Generation InterconnectionSolar
AG2-212Dumont-Greentown 765 kVIndianaActiveAmerican Electric Power400.0200.026.0Generation InterconnectionSolar
AG2-213Gary D.P Tap - Gary D.P 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)80.080.048.0Generation InterconnectionSolar
AG2-215Garner DP-Lancaster 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)196.00.036.92Generation InterconnectionSolar
AG2-216East Sidney-Quincy 138 kVOhioActiveThe Dayton Power and Light Company144.00.025.92Generation InterconnectionSolar
AG2-219Jefferson-Greentown 765 kVIndianaActiveAmerican Electric Power715.0330.042.9Generation InterconnectionSolar
AG2-220East Towanda-South Troy 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC31.031.019.2Generation InterconnectionSolar
AG2-221South Troy - North Towanda 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.020.013.2Generation InterconnectionSolar
AG2-230Dumont 345 kVIndianaActiveAmerican Electric Power150.0150.090.0Generation InterconnectionSolar
AG2-236Potter-Harlan 69 kVPennsylvaniaActiveAmerican Transmission Systems, Incorporated60.020.02.0Generation InterconnectionSolar
AG2-237Thelma 230kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)143.00.00.0Generation InterconnectionStorage
AG2-238Earleys 230 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)99.90.00.0Generation InterconnectionStorage
AG2-239Hickory-Shawboro 230 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)120.00.00.0Generation InterconnectionStorage
AG2-240Old Church 34.5 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)25.00.00.0Generation InterconnectionStorage
AG2-245Olive - Reynolds #1 345 kVIndianaActiveAmerican Electric Power210.0210.0126.0Generation InterconnectionSolar
AG2-248East Elkhart – Elcona Tap 138 kVIndianaActiveAmerican Electric Power100.0100.00.0Generation InterconnectionStorage
AG2-249Stoneboro-Perry 69 kVPennsylvaniaActiveAmerican Transmission Systems, Incorporated20.020.012.0Generation InterconnectionSolar
AG2-250Stoneboro-Perry 69 kV IIPennsylvaniaActiveAmerican Transmission Systems, Incorporated40.020.012.0Generation InterconnectionSolar
AG2-262Dryburg 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)47.011.06.6Generation InterconnectionSolar
AG2-270Clover 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)150.0150.0105.0Generation InterconnectionStorage
AG2-272Berry Hill 138 kVVirginiaActiveAmerican Electric Power55.055.021.3Generation InterconnectionStorage
AG2-279Hagerstown-Conservit 34.5 kVMarylandActiveThe Potomac Edison Company20.020.012.9Generation InterconnectionSolar
AG2-281Church 138 kVMarylandActiveDelmarva Power and Light Company50.050.050.0Generation InterconnectionStorage
AG2-288Stonewall 138 kVVirginiaActiveThe Potomac Edison Company150.0150.0150.0Generation InterconnectionStorage
AG2-289Amsden – Fremont Center 69 kVOhioActiveAmerican Electric Power66.666.60.0Generation InterconnectionStorage
AG2-290Amsden – Fremont Center 69 kVOhioActiveAmerican Electric Power105.038.40.0Generation InterconnectionStorage
AG2-297Cumberland 230 kVNew JerseyActiveAtlantic City Electric19.019.011.4Generation InterconnectionSolar
AG2-298Sulphur Creek-Loretto 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.60.060.040.0Generation InterconnectionSolar
AG2-300Meadow Brook 138 kVVirginiaActiveThe Potomac Edison Company100.0100.070.0Generation InterconnectionStorage
AG2-304Liberty 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)150.0150.0150.0Generation InterconnectionStorage
AG2-310Matt Funk 138 kVVirginiaActiveAmerican Electric Power100.0100.070.0Generation InterconnectionStorage
AG2-311Smith Mountain 138 kVVirginiaActiveAmerican Electric Power75.075.052.5Generation InterconnectionStorage
AG2-320Ladysmith 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)150.0150.0105.0Generation InterconnectionStorage
AG2-327Tennessee Gas-East Towanda 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC58.010.06.0Generation InterconnectionSolar
AG2-328Dumont - Greentown 765 kVIndianaActiveAmerican Electric Power600.0200.026.0Generation InterconnectionSolar
AG2-329S Berwick - Galion 345 kVOhioActiveAmerican Electric Power400.00.0156.0Generation InterconnectionStorage
AG2-330Dumont - Greentown 765 kVIndianaActiveAmerican Electric Power600.0200.0156.0Generation InterconnectionStorage
AG2-331Jefferson-Greentown 765 kVIndianaActiveAmerican Electric Power715.0200.0156.0Generation InterconnectionStorage
AG2-332East Elkhart – Elcona Tap 138 kVIndianaActiveAmerican Electric Power200.0100.0100.0Generation InterconnectionStorage
AG2-338Rogers Road - Carson 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)40.040.040.0Generation InterconnectionStorage
AG2-339Rogers Road - Carson 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.0100.0Generation InterconnectionStorage
AG2-341Ridge Road 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)50.050.020.0Generation InterconnectionStorage
AG2-343Eugene - Dequine 345 kVIndianaActiveAmerican Electric Power100.0100.078.0Generation InterconnectionStorage
AG2-344Dequine 345 bkVIndianaActiveAmerican Electric Power100.0100.078.0Generation InterconnectionStorage
AG2-345Eugene - Dequine 345 kVIndianaActiveAmerican Electric Power150.050.039.0Generation InterconnectionStorage
AG2-347Indian River 230 kV IIDelawareActiveDelmarva Power and Light Company448.8448.8121.2Generation InterconnectionOffshore Wind
AG2-356South Troy - Canton 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.020.012.0Generation InterconnectionSolar
AG2-360Broadford 138 kVVirginiaActiveAmerican Electric Power250.0250.0250.0Generation InterconnectionStorage
AG2-363Powerton 345 kVIllinoisActiveCommonwealth Edison Company300.0300.0180.0Generation InterconnectionSolar
AG2-364Powerton 345 kVIllinoisActiveCommonwealth Edison Company500.0200.0120.0Generation InterconnectionSolar
AG2-365Conneaut Tap-Werner 69 kVPennsylvaniaActiveAmerican Transmission Systems, Incorporated35.035.021.0Generation InterconnectionSolar
AG2-366Garner Delivery Point - Lancaster 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)50.050.020.0Generation InterconnectionStorage
AG2-369Heritage - Wake 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)86.086.051.6Generation InterconnectionSolar
AG2-370Tillman 138 kVIndianaActiveAmerican Electric Power50.050.020.0Generation InterconnectionStorage
AG2-378North Hampton – Medway 69 kVOhioActiveAmerican Transmission Systems, Incorporated74.020.013.5Generation InterconnectionSolar
AG2-380Carville 138 kV IVMarylandActiveDelmarva Power and Light Company106.020.020.0Generation InterconnectionStorage
AG2-382Cashie 230 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)70.070.042.0Generation InterconnectionSolar
AG2-384Chesterfield 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)60.060.024.0Generation InterconnectionStorage
AG2-385North Hampton 69 kVOhioActiveAmerican Transmission Systems, Incorporated128.054.036.5Generation InterconnectionSolar
AG2-400Allen 345 kVIndianaActiveAmerican Electric Power100.0100.060.0Generation InterconnectionSolar
AG2-401Losantville 345 kVIndianaActiveAmerican Electric Power200.00.044.0Generation InterconnectionSolar
AG2-402Allen 345 kVIndianaActiveAmerican Electric Power50.050.020.0Generation InterconnectionStorage
AG2-403Meadow Brook - Mt. Storm 500 kVWest VirginiaActiveThe Potomac Edison Company125.0125.052.5Generation InterconnectionSolar
AG2-404Meadow Brook - Mt. Storm 500 kV IIWest VirginiaActiveThe Potomac Edison Company250.0125.052.5Generation InterconnectionSolar
AG2-405Continental 69 kVOhioActiveAmerican Electric Power49.90.010.98Generation InterconnectionSolar
AG2-406Payne 69 kVOhioActiveAmerican Electric Power49.90.010.98Generation InterconnectionSolar
AG2-408Allen 345 kVIndianaActiveAmerican Electric Power100.00.018.0Generation InterconnectionSolar
AG2-411Statler Hill 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC63.063.040.7Generation InterconnectionSolar
AG2-418Blain 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC40.040.020.0Generation InterconnectionSolar; Storage
AG2-420Eclipse #2 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC25.025.014.0Generation InterconnectionSolar; Storage
AG2-423Cherry Run–Harmony 138 kVWest VirginiaActiveMonongahela Power Company80.080.048.0Generation InterconnectionSolar
AG2-424Magnolia - Summersville 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.63.2563.2534.95Generation InterconnectionSolar; Storage
AG2-426Wakefield - Waverly 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)50.050.047.66Generation InterconnectionSolar; Storage
AG2-427Waverly 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)85.085.066.3Generation InterconnectionSolar; Storage
AG2-428Wakefield 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)170.0170.0135.7Generation InterconnectionSolar; Storage
AG2-429Burma - Armstrong 138 kVPennsylvaniaActiveKeystone Appalachian Transmission Company69.069.053.86Generation InterconnectionSolar; Storage
AG2-430Sunbury-Dalmatia 69 kV IIPennsylvaniaActivePPL Electric Utilities Corporation60.060.037.7Generation InterconnectionSolar
AG2-436Carson - Rogers Road 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)400.0400.0400.0Generation InterconnectionSolar; Storage
AG2-438Union City 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC10.010.06.7Generation InterconnectionSolar
AG2-439Oxbow 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC9.89.85.3Generation InterconnectionSolar
AG2-440Twittys Creek - Madisonville 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.060.0Generation InterconnectionSolar
AG2-441Twittys Creek - Madisonville 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)225.0125.075.0Generation InterconnectionSolar
AG2-442Twittys Creek - Madisonville 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)140.0140.084.0Generation InterconnectionSolar
AG2-444Bixby - Biers Run 345 kVOhioActiveAmerican Electric Power163.0163.0122.5Generation InterconnectionSolar
AG2-447Cedar Creek 138 kV VIIDelawareActiveDelmarva Power and Light Company134.320.012.0Generation InterconnectionSolar
AG2-448Cross School - Westvaco 138 kVWest VirginiaActiveThe Potomac Edison Company50.050.030.0Generation InterconnectionSolar
AG2-449Jefferson-Greentown 765 kVIndianaActiveAmerican Electric Power835.0120.015.0Generation InterconnectionSolar
AG2-450Bridgeport 230 kVNew JerseyActiveAtlantic City Electric219.0219.0115.3Generation InterconnectionStorage
AG2-451Chambers 230 kVNew JerseyActiveAtlantic City Electric240.0240.0123.0Generation InterconnectionStorage
AG2-453Lasalle - Plano 345 kVIllinoisActiveCommonwealth Edison Company280.0280.0196.0Generation InterconnectionSolar
AG2-456Pierce Brook-Lewis Run 230 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC80.080.055.8Generation InterconnectionSolar
AG2-457Pierce Brook - Lewis Run 230 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC160.080.055.8Generation InterconnectionSolar
AG2-458Kittatinny-Newton 34.5 kV IINew JerseyActiveJersey Central Power & Light Company19.80.01.89Generation InterconnectionStorage
AG2-459Allenwood-Larrabee 34.5 kV IINew JerseyActiveJersey Central Power & Light Company7.00.00.7Generation InterconnectionStorage
AG2-460East Flemington-Lebanon 34.5 kV IINew JerseyActiveJersey Central Power & Light Company20.00.02.0Generation InterconnectionStorage
AG2-469Westmoreland – Oak Grove 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)80.080.048.0Generation InterconnectionSolar
AG2-476Hokes-Grantley 69 kV IIPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.00.00.1Generation InterconnectionSolar
AG2-477Hokes-Jackson 69 kV IIIPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.00.00.5Generation InterconnectionSolar
AG2-478Hokes-Jackson 69 kV IVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.00.00.5Generation InterconnectionSolar
AG2-479Penns Tap-Richfield Tie 69 kV IIPennsylvaniaActivePPL Electric Utilities Corporation20.00.04.1Generation InterconnectionSolar
AG2-481Derry Tap-Derry Bus 69 kV IIIPennsylvaniaActivePPL Electric Utilities Corporation20.00.04.1Generation InterconnectionSolar
AG2-484Mifflintown Bus-Mifflintown Tap 69 kV IIPennsylvaniaActivePPL Electric Utilities Corporation20.00.04.1Generation InterconnectionSolar
AG2-487Madison - Tanners Creek 138 kVIndianaActiveAmerican Electric Power152.50.010.6Generation InterconnectionSolar
AG2-491Meadow Lake 345 kVIndianaActiveAmerican Electric Power100.0100.060.0Generation InterconnectionSolar
AG2-492Meadow Lake 345 kVIndianaActiveAmerican Electric Power50.050.020.0Generation InterconnectionStorage
AG2-505Westvaco - Mt Zion 138 kVMarylandActiveThe Potomac Edison Company14.014.014.0Generation InterconnectionHydro
AG2-515Midway 345 kV IIIOhioActiveAmerican Transmission Systems, Incorporated100.0100.060.0Generation InterconnectionSolar
AG2-516Pecatonica 138kVIllinoisActiveCommonwealth Edison Company120.0120.072.0Generation InterconnectionSolar
AG2-518Tech Drive 138 kVVirginiaActiveAmerican Electric Power80.080.032.0Generation InterconnectionStorage
AG2-519Royerton - Desoto 138 kVIndianaActiveAmerican Electric Power111.0111.087.8Generation InterconnectionSolar; Storage
AG2-522Five Forks DP 115 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)80.080.048.0Generation InterconnectionSolar
AG2-524LaSalle Station - Mazon 138 kVIllinoisActiveCommonwealth Edison Company110.0110.0110.0Generation InterconnectionSolar; Storage
AG2-532Pohatcong-Newburgh Tap 34.5 kVNew JerseyActiveJersey Central Power & Light Company20.020.00.0Generation InterconnectionStorage
AG2-533Newburgh-Pohatcong 34.5 kVNew JerseyActiveJersey Central Power & Light Company20.020.00.0Generation InterconnectionStorage
AG2-534Flanders-Pohatcong Mountain R722 34.5 kVNew JerseyActiveJersey Central Power & Light Company20.020.00.0Generation InterconnectionStorage
AG2-535Hackettstown-Pohatcong J738-1 34.5 kV IINew JerseyActiveJersey Central Power & Light Company40.020.00.0Generation InterconnectionStorage
AG2-541Perth - Crystal Hill 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)65.065.039.0Generation InterconnectionSolar; Storage
AG2-544Silver Lake 345 kVIllinoisActiveCommonwealth Edison Company200.0200.080.0Generation InterconnectionStorage
AG2-545Silver Lake 345 kVIllinoisActiveCommonwealth Edison Company600.0400.0160.0Generation InterconnectionStorage
AG2-548Corwin - Elk 138 kVOhioActiveAmerican Electric Power90.090.054.0Generation InterconnectionSolar; Storage
AG2-550Bluff Point - Randolph 138 kVIndianaActiveAmerican Electric Power100.0100.060.0Generation InterconnectionSolar
AG2-551Bluff Point - Randolph 138 kVIndianaActiveAmerican Electric Power150.050.020.0Generation InterconnectionStorage
AG2-553Bullitt County 161 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.50.050.020.0Generation InterconnectionStorage
AG2-561Glory - Glen Campbell 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.020.012.0Generation InterconnectionSolar
AG2-562Elderberry 345 kVIndianaActiveAmerican Electric Power767.052.00.0Generation InterconnectionNatural Gas
AG2-564Sulphur Springs 138 kVOhioActiveAmerican Electric Power49.9949.9932.9Generation InterconnectionSolar
AG2-566Briery - Finneywood 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)110.030.012.0Generation InterconnectionStorage
AG2-568Stink Run – Sundial 138 kVWest VirginiaActiveAmerican Electric Power80.080.048.0Generation InterconnectionSolar
AG2-570Heritage - Wake 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)400.0400.0100.0Generation InterconnectionSolar
AG2-571Heritage - Wake 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)500.0100.040.0Generation InterconnectionStorage
AG2-575Crego Rd. 138 kVIllinoisActiveCommonwealth Edison Company290.0100.080.0Generation InterconnectionSolar; Storage
AG2-581Rawlings-Clover 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)150.0150.090.0Generation InterconnectionSolar
AG2-582Flint Run 500 kVWest VirginiaActiveMonongahela Power Company2100.02100.02075.0Generation InterconnectionNatural Gas
AG2-583Bremo - Cartersville 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)115.0115.069.0Generation InterconnectionSolar
AG2-585Kensington 138kVIllinoisActiveCommonwealth Edison Company125.0125.075.0Generation InterconnectionSolar
AG2-589Ravenswood - Hemlock 69 kVOhioActiveAmerican Electric Power20.020.02.0Generation InterconnectionSolar
AG2-615Carlos Junction-Garrett 138 kVMarylandActiveThe Potomac Edison Company100.0100.062.6Generation InterconnectionSolar
AG2-616Churchtown - Upper Pittsgrove 138 kVNew JerseyActiveAtlantic City Electric50.050.032.35Generation InterconnectionSolar
AG2-617Waugh Chapel 115 kVMarylandActiveBaltimore Gas and Electric Company55.055.033.0Generation InterconnectionSolar
AG2-618Morgantown 230 kVMarylandActivePotomac Electric Power Company110.0110.071.5Generation InterconnectionSolar
AG2-621Hoytdale 138 kVPennsylvaniaActiveAmerican Transmission Systems, Incorporated150.0150.0150.0Generation InterconnectionStorage
AG2-625Pequest River-Furnace Brook Tap 34.5 kV IINew JerseyActiveJersey Central Power & Light Company19.619.68.232Generation InterconnectionSolar
AG2-626Pequest River-Furnace Brook Tap 34.5 kV IIINew JerseyActiveJersey Central Power & Light Company12.512.55.25Generation InterconnectionSolar
AG2-627Woodstown-High Street 69 kVNew JerseyActiveAtlantic City Electric40.040.024.0Generation InterconnectionSolar
AG2-637Randolph - Hodgin 138 kVIndianaActiveAmerican Electric Power150.0150.090.0Generation InterconnectionSolar
AG2-646Chesterfield 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)200.0200.0200.0Generation InterconnectionStorage
AG2-654Craigsville - Leards Crossing 12 kVPennsylvaniaActiveKeystone Appalachian Transmission Company14.714.78.8Generation InterconnectionSolar
AG2-657Kanawha River - Carbondale 138 kVWest VirginiaActiveAmerican Electric Power90.090.037.8Generation InterconnectionSolar
AG2-658Cowen 138 kVWest VirginiaActiveMonongahela Power Company210.0210.0135.3Generation InterconnectionSolar
AG2-659Kerr Dam – Hawtree 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)80.080.048.0Generation InterconnectionSolar
AG2-660Nelson-Electric Junction 345 kVIllinoisActiveCommonwealth Edison Company600.00.020.0Generation InterconnectionStorage
AG2-661Hopewell - Colonial Trail 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)150.00.020.0Generation InterconnectionStorage
AG2-665Corwin - Elk 138 kVOhioActiveAmerican Electric Power180.090.054.0Generation InterconnectionSolar; Storage
AG2-670Green County -Taylor County Junction 161 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.75.075.045.0Generation InterconnectionSolar
AG2-675Cordova 345 kVIllinoisActiveCommonwealth Edison Company335.080.032.0Generation InterconnectionStorage
AH1-004Avon - Renaker 138 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.40.040.024.0Generation InterconnectionSolar
AH1-005East Towanda-South Troy 115 kV IIPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC51.020.014.0Generation InterconnectionSolar
AH1-012Louisa - North Anna 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)50.050.020.0Generation InterconnectionStorage
AH1-027Cartanza 230 kVDelawareActiveDelmarva Power and Light Company25.025.015.0Generation InterconnectionSolar
AH1-033Sligo 34.5 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)19.519.513.0Generation InterconnectionSolar
AH1-034Patton Road Junction - Summer Shade 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.100.0100.070.0Generation InterconnectionSolar
AH1-035Plymouth 34.5 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.013.5Generation InterconnectionSolar
AH1-040Mackeys - Creswell 115 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)150.0150.090.0Generation InterconnectionSolar
AH1-042Providence Forge-Turner 115kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)154.0154.099.9Generation InterconnectionSolar
AH1-044Nelson - Electric Junction 345 kVIllinoisActiveCommonwealth Edison Company800.0200.0120.0Generation InterconnectionSolar
AH1-047Marengo - Belvidere 138 kVIllinoisActiveCommonwealth Edison Company58.658.637.0Generation InterconnectionSolar
AH1-050Eclipse-Piney 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC50.050.030.0Generation InterconnectionSolar
AH1-051Eclipse-Piney 115 kV IIPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC80.030.018.0Generation InterconnectionSolar
AH1-054Upton-Whitings 34.5 kVNew JerseyActiveJersey Central Power & Light Company8.258.253.465Generation InterconnectionSolar
AH1-055Kyger Creek - Don Marquis 345 kVOhioActiveOhio Valley Electric Corporation220.0220.0154.0Generation InterconnectionSolar
AH1-056Red House DP 115kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.068.5Generation InterconnectionSolar
AH1-057Edgewood 12.47 kVMarylandActiveDelmarva Power and Light Company7.27.23.0Generation InterconnectionSolar
AH1-059Sharp Road 69 kVOhioActiveAmerican Electric Power120.040.024.0Generation InterconnectionSolar
AH1-060Cardington-Liberty 69 kV IIIOhioActiveAmerican Transmission Systems, Incorporated94.020.012.0Generation InterconnectionSolar
AH1-065Hopewell 34.5kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.08.0Generation InterconnectionStorage
AH1-066Hopewell 34.5kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)10.010.04.0Generation InterconnectionStorage
AH1-069Jerome – Mohicanville 69 kVOhioActiveAmerican Transmission Systems, Incorporated17.017.010.2Generation InterconnectionSolar
AH1-070Jerome – Mohicanville 69 kVOhioActiveAmerican Transmission Systems, Incorporated34.017.010.2Generation InterconnectionSolar
AH1-071Midlothian 34.5 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.012.0Generation InterconnectionSolar
AH1-072Red Onion - VC5 69 kVVirginiaActiveAmerican Electric Power20.020.012.0Generation InterconnectionSolar
AH1-073Red Onion - VC5 69 kVVirginiaActiveAmerican Electric Power40.020.012.0Generation InterconnectionSolar
AH1-075North Waldo - Wild Creek 138 kVOhioActiveAmerican Electric Power68.08.024.7Generation InterconnectionSolar
AH1-086Morrisville 230kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)90.090.090.0Generation InterconnectionStorage
AH1-087Morrisville 230kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)110.020.020.0Generation InterconnectionStorage
AH1-088Morrisville 230kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)130.020.020.0Generation InterconnectionStorage
AH1-089Morrisville 230kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)150.020.020.0Generation InterconnectionStorage
AH1-091Ahoskie 34.5kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)17.00.00.0Generation InterconnectionStorage
AH1-098Wolf Glade-West Carroll 138 kVVirginiaActiveAmerican Electric Power40.040.024.0Generation InterconnectionSolar; Storage
AH1-102Seward-Glory 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC100.0100.063.4Generation InterconnectionSolar
AH1-106Winterpock 34.5kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)26.026.015.6Generation InterconnectionSolar
AH1-107Winterpock 34.5kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)26.026.015.6Generation InterconnectionSolar
AH1-108Spruance NUG 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)66.00.09.0Generation InterconnectionNatural Gas
AH1-124Vint Hill 34.5kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.00.0Generation InterconnectionStorage
AH1-125Brambleton 34.5kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.00.0Generation InterconnectionStorage
AH1-127Railroad 34.5kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.00.0Generation InterconnectionStorage
AH1-128Railroad 34.5kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.00.0Generation InterconnectionStorage
AH1-133Saltville - Tazewell 138 kVVirginiaActiveAmerican Electric Power100.0100.060.0Generation InterconnectionSolar
AH1-136Falcon - Middle Creek 46 kVKentuckyActiveAmerican Electric Power20.020.012.0Generation InterconnectionSolar
AH1-138Penniman 34.5 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.08.4Generation InterconnectionSolar
AH1-140Vasco 138 kVPennsylvaniaActiveKeystone Appalachian Transmission Company150.0150.0115.0Generation InterconnectionSolar; Storage
AH1-144Peter's Mountain 138 kVVirginiaActiveAmerican Electric Power120.0120.050.4Generation InterconnectionSolar
AH1-145Peter's Mountain 138 kVVirginiaActiveAmerican Electric Power200.080.080.0Generation InterconnectionStorage
AH1-146White Rock - Wayne 345 kVIllinoisActiveCommonwealth Edison Company200.0200.0120.0Generation InterconnectionSolar
AH1-147White Rock - Wayne 345 kVIllinoisActiveCommonwealth Edison Company400.0200.0120.0Generation InterconnectionSolar
AH1-150Nelson-Electric Junction 345 kVIllinoisActiveCommonwealth Edison Company1000.0200.0120.0Generation InterconnectionSolar
AH1-151Nelson-Electric Junction 345 kVIllinoisActiveCommonwealth Edison Company1200.0200.0120.0Generation InterconnectionSolar
AH1-153Dumont 345 kVIndianaActiveAmerican Electric Power300.0150.090.0Generation InterconnectionSolar
AH1-157Penniman - Waller 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.0100.0Generation InterconnectionStorage
AH1-158Eclipse-Piney 115 kV IIIPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC80.00.030.0Generation InterconnectionStorage
AH1-164Oak Level - Tank Hill 138 kVVirginiaActiveAmerican Electric Power35.035.021.0Generation InterconnectionSolar
AH1-165Will County 138 kVIllinoisActiveCommonwealth Edison Company72.072.00.0Generation InterconnectionStorage
AH1-170Columbia DP 115kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)20.020.012.0Generation InterconnectionSolar
AH1-188Pigeon Creek 138 kVWest VirginiaActiveAmerican Electric Power140.0140.084.0Generation InterconnectionSolar
AH1-196Prairie 345 kVIllinoisActiveCommonwealth Edison Company150.0150.090.0Generation InterconnectionSolar
AH1-201Allegheny-New Baltimore 115kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC40.040.024.0Generation InterconnectionSolar
AH1-203Allegheny-Somerset 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC70.070.042.0Generation InterconnectionSolar
AH1-205Allegheny-New Baltimore 115kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC40.00.016.0Generation InterconnectionStorage
AH1-206Bethelboro 138 kVPennsylvaniaActiveKeystone Appalachian Transmission Company60.060.060.0Generation InterconnectionStorage
AH1-212Bethlehem - Lilly 46 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.020.012.0Generation InterconnectionSolar
AH1-215Central VA-Twitty 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)31.531.518.9Generation InterconnectionSolar; Storage
AH1-216Smithfield-Surry 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)99.099.079.2Generation InterconnectionSolar; Storage
AH1-217Kidds Store - Fork Union 115 kV IIVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)57.057.034.2Generation InterconnectionSolar
AH1-220Remington CT 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.00.060.0Generation InterconnectionStorage
AH1-221Heritage 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)75.00.045.0Generation InterconnectionStorage
AH1-223Poland Rd-Runway DP 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)150.00.020.0Generation InterconnectionStorage
AH1-227Flemming - Fremont 69 kVVirginiaActiveAmerican Electric Power51.351.330.78Generation InterconnectionSolar
AH1-234Wempletown - Paddock 345 kVIllinoisActiveCommonwealth Edison Company224.0224.029.12Generation InterconnectionSolar
AH1-239Upchurch - Zula 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.80.080.048.0Generation InterconnectionSolar
AH1-241Cobbs Creek - James River Industrial 115kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.060.0Generation InterconnectionSolar
AH1-247Lardin - Lake Lynn 138kVPennsylvaniaActiveKeystone Appalachian Transmission Company40.040.024.0Generation InterconnectionSolar
AH1-248Lardin - Lake Lynn 138kVPennsylvaniaActiveKeystone Appalachian Transmission Company65.025.015.0Generation InterconnectionSolar
AH1-249Lardin – Lake Lynn 138kVPennsylvaniaActiveKeystone Appalachian Transmission Company145.080.080.0Generation InterconnectionStorage
AH1-251Todds Tavern- Spotsylvania/Goldsdale 115kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)50.050.050.0Generation InterconnectionStorage
AH1-254Greenland Gap 500 kV IIWest VirginiaActiveMonongahela Power Company171.4171.436.538Generation InterconnectionWind
AH1-257Broadway - Washington 34.5 kVNew JerseyActiveJersey Central Power & Light Company19.2519.258.085Generation InterconnectionSolar
AH1-258Belford - Keansburg 34.5 kVNew JerseyActiveJersey Central Power & Light Company19.2519.258.085Generation InterconnectionSolar
AH1-260New Freedom - Monroe 230 kVNew JerseyActiveAtlantic City Electric300.0300.0300.0Generation InterconnectionStorage
AH1-261Northeast - Riverside 230 kVMarylandActiveBaltimore Gas and Electric Company135.0135.0135.0Generation InterconnectionStorage
AH1-263Chancellor 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)200.0200.0200.0Generation InterconnectionStorage
AH1-265Winslow - Monroe 69kVNew JerseyActiveAtlantic City Electric29.429.412.35Generation InterconnectionSolar
AH1-268Seward-Glory 115 kV IIPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC100.00.036.6Generation InterconnectionStorage
AH1-269Claytor 138 kVVirginiaActiveAmerican Electric Power50.050.050.0Generation InterconnectionStorage
AH1-271Cashie 230 kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)110.040.024.0Generation InterconnectionSolar
AH1-272Argenta - Twin Branch 345 kVMichiganActiveAmerican Electric Power185.0185.0123.9Generation InterconnectionSolar
AH1-274Butler 69 kVNew JerseyActiveAtlantic City Electric16.716.77.0Generation InterconnectionSolar
AH1-280Jetersville-Ponton 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)106.020.012.0Generation InterconnectionSolar
AH1-281Bluegrass Parkway Tap - Woodlawn 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.20.020.012.0Generation InterconnectionSolar
AH1-282Galion - Ohio Central 345 kVOhioActiveAmerican Electric Power150.0150.090.0Generation InterconnectionSolar
AH1-283Mount Storm-Pruntytown 500kVMarylandActiveThe Potomac Edison Company200.0200.0120.0Generation InterconnectionSolar
AH1-285Sandwich 138 kVIllinoisActiveCommonwealth Edison Company86.086.011.18Generation InterconnectionSolar
AH1-292Sullivan 345 kVIndianaActiveAmerican Electric Power200.00.044.0Generation InterconnectionSolar
AH1-298Meridian 345 kVIndianaActiveAmerican Electric Power75.075.075.0Generation InterconnectionStorage
AH1-302Olive - Reynolds 345 kVIndianaActiveAmerican Electric Power275.075.075.0Generation InterconnectionStorage
AH1-304Delaware-Van Buren 138 kVIndianaActiveAmerican Electric Power163.00.09.8Generation InterconnectionSolar
AH1-305Olive - Reynolds 345 kVIndianaActiveAmerican Electric Power275.00.035.72Generation InterconnectionSolar
AH1-306Mississinewa-Gaston 138 kVIndianaActiveAmerican Electric Power200.00.028.8Generation InterconnectionSolar
AH1-308Pennville - Adams 138 kVIndianaActiveAmerican Electric Power205.050.050.0Generation InterconnectionStorage
AH1-309Kenzie Creek-Colby 138 kVMichiganActiveAmerican Electric Power150.00.027.0Generation InterconnectionSolar
AH1-311Heartsease DP - Mayo Dunbar 115kVNorth CarolinaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)75.00.02.25Generation InterconnectionSolar
AH1-313Moshannon-Milesburg 230 kV VIIPennsylvaniaActiveKeystone Appalachian Transmission Company100.0100.060.0Generation InterconnectionSolar; Storage
AH1-314East Danville 138 kVVirginiaActiveAmerican Electric Power100.0100.0100.0Generation InterconnectionStorage
AH1-323Elmont 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.0100.0Generation InterconnectionStorage
AH1-324Colonial Trail – Surry 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)80.080.048.0Generation InterconnectionSolar
AH1-327Hardin Switch 345 kVOhioActiveAmerican Electric Power250.00.08.44Generation InterconnectionSolar
AH1-328Blue Jacket - Kirby 138 kVOhioActiveThe Dayton Power and Light Company206.550.021.3Generation InterconnectionSolar
AH1-334Lakehurst - Whitings 34.5 kVNew JerseyActiveJersey Central Power & Light Company19.2519.258.085Generation InterconnectionSolar
AH1-337Randolph - Hodgin 138 kVIndianaActiveAmerican Electric Power46.046.039.0Generation InterconnectionSolar
AH1-338McGirr Rd - Ritchie Road 138kVIllinoisActiveCommonwealth Edison Company180.0180.023.4Generation InterconnectionSolar
AH1-339West Crawford 69 kVOhioActiveAmerican Electric Power80.080.06.76Generation InterconnectionSolar
AH1-340Cheat Lake-Ruthbelle 138 kVWest VirginiaActiveMonongahela Power Company48.8948.8929.33Generation InterconnectionSolar
AH1-341Stillman - Dixon 138KVIllinoisActiveCommonwealth Edison Company150.0150.096.6Generation InterconnectionSolar
AH1-343Crystal Hill DP- Perth 115kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)69.069.041.4Generation InterconnectionSolar
AH1-345Remington 324 34.5 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)14.014.08.4Generation InterconnectionSolar
AH1-348Pound 34.5 kVVirginiaActiveAmerican Electric Power10.010.06.0Generation InterconnectionSolar
AH1-357Pierce Brook-Lewis Run 230kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC180.020.012.0Generation InterconnectionSolar
AH1-358Pierce Brook-Lewis Run 230kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC200.020.020.0Generation InterconnectionStorage
AH1-359Pierce Brook - Lewis Run 230 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC220.020.012.0Generation InterconnectionSolar
AH1-360Pierce Brook - Lewis Run 230 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC240.020.020.0Generation InterconnectionStorage
AH1-367AFranklin 138 kV IIPennsylvaniaActiveKeystone Appalachian Transmission Company72.072.043.2Generation InterconnectionSolar
AH1-377Clover- Farmville 230kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)186.0186.0111.6Generation InterconnectionSolar
AH1-380Mt Olive - Kenny 69kVMarylandActiveDelmarva Power and Light Company20.020.012.0Generation InterconnectionSolar
AH1-387Meadowbrook-Greenland Gap 500kVWest VirginiaActiveThe Potomac Edison Company150.0150.022.05Generation InterconnectionWind
AH1-391Olive 138 kVIndianaActiveAmerican Electric Power100.0100.067.0Generation InterconnectionSolar
AH1-392Gravel Pit-Kankakee 138 kVIndianaActiveAmerican Electric Power90.090.060.0Generation InterconnectionSolar
AH1-396Gary 24.94 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)12.012.01.8Generation InterconnectionSolar
AH1-397Shacklesford 34.5 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)19.81819.8182.97Generation InterconnectionSolar
AH1-399North Doswell 12.5 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)9.879.871.48Generation InterconnectionSolar
AH1-408Freeman DP – Lawrenceville 115 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)120.0120.075.0Generation InterconnectionSolar
AH1-426Gilboa-Jones Branch 138 kV IVWest VirginiaActiveMonongahela Power Company64.664.664.6Generation InterconnectionStorage
AH1-426AGilboa-Jones Branch 138 kV VWest VirginiaActiveMonongahela Power Company96.932.332.3Generation InterconnectionStorage
AH1-427Tommy Gooch - Garrard County 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.100.0100.060.0Generation InterconnectionSolar
AH1-439Buckingham- Farmville 230kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)85.085.051.0Generation InterconnectionSolar
AH1-452Clementine-Clementine Jct. 25 kVPennsylvaniaActiveKeystone Appalachian Transmission Company19.919.98.35Generation InterconnectionSolar
AH1-460Hooversville - Scalp Level 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC66.066.039.6Generation InterconnectionSolar
AH1-461Buckhorn 138 kVVirginiaActiveAmerican Electric Power80.080.080.0Generation InterconnectionStorage
AH1-482Olive - Reynolds #2 345 kVIndianaActiveAmerican Electric Power338.078.078.0Generation InterconnectionStorage
AH1-487Camp Reynolds 12.5 kVPennsylvaniaActiveAmerican Transmission Systems, Incorporated20.020.012.0Generation InterconnectionSolar
AH1-490Venango Junction 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.020.012.0Generation InterconnectionSolar
AH1-491Union City 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC20.020.012.0Generation InterconnectionSolar
AH1-528Rawlings - Unity 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)300.8300.8180.0Generation InterconnectionSolar
AH1-535Nagel - Cane River 230 kVTennesseeActiveAmerican Electric Power100.0100.040.0Generation InterconnectionSolar; Storage
AH1-536Church-Oil City 138kVMarylandActiveDelmarva Power and Light Company41.841.88.5Generation InterconnectionSolar; Storage
AH1-537Pierce - Kyger Creek 345 kVOhioActiveOhio Valley Electric Corporation178.5178.517.85Generation InterconnectionSolar
AH1-539South Kenton 138 kVOhioActiveAmerican Electric Power129.4129.425.88Generation InterconnectionSolar; Storage
AH1-541Chestnut 345 kVIllinoisActiveCommonwealth Edison Company92.492.427.72Generation InterconnectionSolar; Storage
AH1-542Crissinger-Kirby 138kVOhioActiveAmerican Transmission Systems, Incorporated110.0110.022.0Generation InterconnectionSolar; Storage
AH1-543Mulberry – Tazewell 345 kVIllinoisActiveCommonwealth Edison Company157.4157.431.48Generation InterconnectionSolar; Storage
AH1-545Wylie Ridge-Tidd 345kVPennsylvaniaActiveKeystone Appalachian Transmission Company200.0200.020.0Generation InterconnectionSolar
AH1-546Bremo - Buckingham 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)79.879.847.8Generation InterconnectionSolar
AH1-552Chalk Point 230 kVMarylandActivePotomac Electric Power Company670.2670.2670.2Generation InterconnectionSolar; Storage
AH1-563Aurora E.C. 138kVIllinoisActiveCommonwealth Edison Company1206.0150.0150.0Generation InterconnectionStorage
AH1-564Rockford II 138 kVIllinoisActiveCommonwealth Edison Company330.0150.0150.0Generation InterconnectionStorage
AH1-567University Park 138 kVIllinoisActiveCommonwealth Edison Company328.05.05.0Generation InterconnectionNatural Gas
AH1-570Headquarters - Millersburg Junction 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.25.025.015.6Generation InterconnectionSolar
AH1-571Headquarters - Millersburg Junction 69 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.45.020.012.5Generation InterconnectionSolar
AH1-577Clutch 69 kVOhioActiveAmerican Electric Power70.070.042.0Generation InterconnectionSolar
AH1-578Clutch 69 kVOhioActiveAmerican Electric Power98.028.028.0Generation InterconnectionStorage
AH1-580Nottingham 138 kVOhioActiveAmerican Electric Power400.0200.0134.0Generation InterconnectionSolar
AH1-584Nelson-Indian River 138kVDelawareActiveDelmarva Power and Light Company50.050.030.0Generation InterconnectionSolar
AH1-585Nelson-Indian River 138kVDelawareActiveDelmarva Power and Light Company100.050.030.0Generation InterconnectionSolar
AH1-586Nelson-Indian River 138kVDelawareActiveDelmarva Power and Light Company145.045.045.0Generation InterconnectionStorage
AH1-587Farmers Valley – Ridgeway 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC200.0200.0120.0Generation InterconnectionSolar
AH1-588Lewis Run - Pierce Brook 230 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC240.0240.0144.0Generation InterconnectionSolar
AH1-589Lewis Run - Pierce Brook 230 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC410.0170.0170.0Generation InterconnectionStorage
AH1-617Harbert Metering 138 kVKentuckyActiveAmerican Electric Power200.0200.0120.0Generation InterconnectionSolar
AH1-634Indian River 230kV IDelawareActiveDelmarva Power and Light Company323.168.017.7Generation InterconnectionOffshore Wind
AH1-637Oak Grove 34.5 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)16.016.09.6Generation InterconnectionSolar
AH1-641Churchtown - Upper Pittsgrove 138kVNew JerseyActiveAtlantic City Electric65.015.015.0Generation InterconnectionSolar
AH1-644Spicewood Metering 138 kVKentuckyActiveAmerican Electric Power100.0100.065.0Generation InterconnectionSolar
AH1-661Cannelville 12.47 kVOhioActiveAmerican Electric Power10.0710.079.06Generation InterconnectionBiomass
AH1-664Goddard-Plumville 138 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.100.0100.066.8Generation InterconnectionSolar
AH1-665Goddard-Plumsville 138 kV IIKentuckyActiveEast Kentucky Power Cooperative, Inc.180.080.053.5Generation InterconnectionSolar
AH1-666Flemingsburg - Spurlock 138 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.80.080.048.0Generation InterconnectionSolar
AH1-667Philipsburg-Shawville 34.5 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC18.018.010.8Generation InterconnectionSolar
AH1-669Circleville-Biers Run 138 kVOhioActiveAmerican Electric Power50.050.030.0Generation InterconnectionSolar
AH1-670Blue Mound-Chestnut 345 kVIllinoisActiveCommonwealth Edison Company250.0250.049.6Generation InterconnectionWind
AH1-672Farmview 138 kVDelawareActiveDelmarva Power and Light Company75.075.048.9Generation InterconnectionSolar
AH1-673State Line - River Energy Center 138 kVIllinoisActiveCommonwealth Edison Company85.085.085.0Generation InterconnectionStorage
AH1-676Gordonsville 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)1294.61294.61275.9Generation InterconnectionNatural Gas
AH1-677Rogers Road 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)1756.00.067.0Generation InterconnectionNatural Gas
AH1-678Heritage 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)1525.50.034.0Generation InterconnectionNatural Gas
AH1-679Four Rivers 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)766.020.020.0Generation InterconnectionNatural Gas
AH1-680Sammis - South Canton 345 kVOhioActiveAmerican Transmission Systems, Incorporated1300.01300.01300.0Generation InterconnectionNatural Gas
AH1-681Cunningham 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)1000.00.027.3Generation InterconnectionNatural Gas
AH1-682Ladysmith CT 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)190.00.021.0Generation InterconnectionNatural Gas
AH1-683Ladysmith CT 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)190.00.025.0Generation InterconnectionNatural Gas
AH1-684Remington CT 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)190.00.023.0Generation InterconnectionNatural Gas
AH1-685Remington CT 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)190.00.026.0Generation InterconnectionNatural Gas
AH1-686Hanging Rock 765 kVOhioActiveAmerican Electric Power1364.024.021.0Generation InterconnectionNatural Gas
AH1-687Bear Garden 230kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)682.00.051.0Generation InterconnectionNatural Gas
AH1-690Bay Shore - Lallendorf 345 kVOhioActiveAmerican Transmission Systems, Incorporated1475.01475.01440.0Generation InterconnectionNatural Gas
AH1-691Ladysmith CT 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)209.00.026.0Generation InterconnectionNatural Gas
AH1-692Ladysmith CT 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)209.00.026.0Generation InterconnectionNatural Gas
AH1-693Remington CT 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)190.00.020.0Generation InterconnectionNatural Gas
AH1-694Ladysmith CT 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)190.00.018.0Generation InterconnectionNatural Gas
AH1-695Three Mile Island 230 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC859.0859.0803.0Generation InterconnectionNuclear
AH1-696Possum Point 230kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)668.00.094.0Generation InterconnectionNatural Gas
AH1-698Braidwood 345 kVIllinoisActiveCommonwealth Edison Company2584.0130.057.6Generation InterconnectionNuclear
AH1-699Wellsville 345 kVOhioActiveAmerican Transmission Systems, Incorporated1210.058.069.0Generation InterconnectionNatural Gas
AH1-701Valero 69 kVNew JerseyActiveAtlantic City Electric61.00.020.0Generation InterconnectionNatural Gas
AH1-702Byron 345 kVIllinoisActiveCommonwealth Edison Company2530.088.043.0Generation InterconnectionNuclear
AH1-703Bergen 230kVNew JerseyActivePublic Service Electric and Gas Company670.6135.6151.254Generation InterconnectionNatural Gas
AH1-704Hannibal 138 kVOhioActiveAmerican Electric Power509.024.020.0Generation InterconnectionNatural Gas
AH1-705Sunbury #1 500kVPennsylvaniaActivePPL Electric Utilities Corporation1153.432.432.4Generation InterconnectionNatural Gas
AH1-706Lordstown 345 kVOhioActiveAmerican Transmission Systems, Incorporated970.45330.45323.823Generation InterconnectionNatural Gas
AH1-707Saegers 230 kVPennsylvaniaActivePPL Electric Utilities Corporation907.00.030.0Generation InterconnectionNatural Gas
AH1-710Salem 500kVNew JerseyActivePublic Service Electric and Gas Company2650.8256.8228.2Generation InterconnectionNuclear
AH1-711Lemoyne 345 kVOhioActiveAmerican Transmission Systems, Incorporated1108.2408.2292.5Generation InterconnectionNatural Gas
AH1-712Cunningham 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)776.0776.0611.0Generation InterconnectionNatural Gas
AH1-713Mt. Storm 500kVWest VirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)538.00.014.0Generation InterconnectionCoal
AH1-714Lasalle 345 kVIllinoisActiveCommonwealth Edison Company1360.0169.0174.1Generation InterconnectionNuclear
AH1-715Linden 230kVNew JerseyActivePublic Service Electric and Gas Company803.17127.17149.369Generation InterconnectionNatural Gas
AH1-716Surry-Skiffes Creek 500kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)650.0650.0650.0Generation InterconnectionStorage
AH1-717Surry 230kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)453.085.092.7Generation InterconnectionNatural Gas
AH1-718Nelson 345 kVIllinoisActiveCommonwealth Edison Company391.011.038.0Generation InterconnectionNatural Gas
AH1-719Beverly 345 kVOhioActiveAmerican Electric Power694.024.021.0Generation InterconnectionNatural Gas
AH1-720East Towanda 230 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC907.50.060.0Generation InterconnectionNatural Gas
AH1-721Laurel-Cooper 161 kVKentuckyActiveEast Kentucky Power Cooperative, Inc.786.0786.0758.9507Generation InterconnectionNatural Gas
AH1-722Linden 230kVNew JerseyActivePublic Service Electric and Gas Company806.4130.4158.1Generation InterconnectionNatural Gas
AH1-723Cunningham 500 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)776.0776.0712.0Generation InterconnectionNatural Gas
AH1-725Conastone 500 kVMarylandActiveBaltimore Gas and Electric Company500.0500.0500.0Generation InterconnectionStorage
AH1-727Brambleton-Goose Creek 500kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)425.0425.0425.0Generation InterconnectionStorage
AH1-729Ocean Court 230 kVVirginiaActiveVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)100.0100.0100.0Generation InterconnectionStorage
AH1-734South Bend 500 kVPennsylvaniaActiveKeystone Appalachian Transmission Company1058.4270.3268.6Generation InterconnectionNatural Gas
AH1-735Richland 138 kVOhioActiveAmerican Transmission Systems, Incorporated447.019.055.0Generation InterconnectionNatural Gas
AH1-744Cheltenham 500 kVMarylandActivePotomac Electric Power Company853.553.548.285Generation InterconnectionNatural Gas
AH1-746Madera - Westover South 115 kVPennsylvaniaActiveMid-Atlantic Interstate Transmission, LLC109.90.020.0Generation InterconnectionWind

Stability Clusters

Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.

Shared POIs

At PJM's discretion, New Service Requests in a Cycle at the same Point of Interconnection may be aggregated for the purposes of Phase I System Impact Studies, in accordance with PJM Open Access Transmission Tariff, Part VIII, Subpart C, section 404.2.a.iii.

List of Shared POIs Studied in Transition Cycle 2 Phase I
Shared POI NameNew Service Requests Aggregated
AD2-074 115 kV - DominionAG2-005, AG2-215
AE2-094 500 kV - DominionAG2-338, AG2-339
AF1-122 / AG2-056 / AH1-060 (ATSI)AG2-057, AH1-060
AG2-068 500 kV - DominionAG2-068, AG2-069, AG2-369
AG2-198 230 kV - DominionAG2-198, AG2-566
AG2-440 115 kV - DominionAG2-440, AG2-441, AG2-442
AG2-570 500 kV - DominionAG2-570, AG2-571
AG2-580 500 kV - DominionAG2-581
AH1-439 230 kV - DominionAH1-439
AH1-716 / AH1-726 (Dominion)AH1-716
Byron - Wayne 345 kV - ComEdAH1-146, AH1-147
Cashie 230 kV - DominionAG2-382, AH1-271
Cunningham 500 kV (Dominion)AH1-681, AH1-712, AH1-723
Deepwater - Upper Pittsgrove 138 kV - AECAG2-616, AH1-641
Hopewell 34kV - DominionAH1-065, AH1-066
Indian River 230 kV (DPL)AG2-347, AH1-634
Ladysmith CT (Dominion)AH1-682, AH1-683, AH1-691, AH1-692, AH1-694
Meadowlake 345kV (AEP)AG2-014, AG2-491, AG2-492
Mississinewa 138kV (AEP)AG2-191, AG2-192
Morrisville 230 kV - DominionAH1-086, AH1-087, AH1-088, AH1-089
Nelson - Indian River 138 kV (DPL)AH1-584, AH1-585, AH1-586
Nelson-Electric Junction 345kV - ComEdAG2-660, AH1-044, AH1-150, AH1-151
New AE2-262/263 230kV swyd - PenelecAH1-313
New AF2-311 138kV swyd - APSAH1-426, AH1-426A
New AG2-063 69kV swyd (ATSI)AG2-063, AG2-378, AG2-385
New AG2-081 138kV swydAG2-081, AH1-004
New AG2-165 765kV swyd - AEPAG2-165, AG2-212, AG2-328
New AG2-206 115kV swyd - PenelecAG2-206, AG2-327
New AG2-220 115kV swyd - PenelecAG2-220, AH1-005
New AG2-249 69kV swyd (ATSI)AG2-249, AG2-250
New AG2-403 500kV swyd - APSAG2-403, AG2-404
New AG2-456 230kV swyd - PenelecAG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-588, AH1-589
New AH1-050 115kV swyd - PenelecAH1-050, AH1-051, AH1-158
New AH1-069 69kV swyd (ATSI)AH1-069, AH1-070
New AH1-102 115kV swyd - PenelecAH1-102, AH1-268
New AH1-247 138kV swyd - APSAH1-247, AH1-248, AH1-249
New Baltimore 115kV sub - PenelecAH1-201, AH1-205
Perth 115 kV - DominionAG2-111, AG2-112
Powerton ;B 345 kV (ComEd)AG2-363, AG2-364
Remington CT (Dominion)AH1-684, AH1-685, AH1-693
Scalp Level 23kV Express Feed - PenelecAG2-090, AG2-091
Silver Lake 345 kV (ComEd)AG2-544, AG2-545
South Troy 34.5kV - PenelecAG2-221, AG2-356
Union City 34.5kV - PenelecAG2-438, AH1-491
Winterpock 230kV - DominionAH1-106, AH1-107

CIR Claims From Deactivated Generators

The following Transition Cycle 2 Phase I projects intend to claim and transfer CIRs from deactivated capacity generation resources. PJM performed a reliability analysis of the impacts to the system capability for the proposed transfers of CIRs from the deactivated generation resources.

List of Transition Cycle 2 Phase I Projects Claiming CIRs from Deactivated Generators
ProjectStatusDeactivated Generators
AG2-366Active
Unit NameStatusCIR ClaimedPOI Transfer
Possum Point 5Deactivated Generator20.0Yes
AG2-369Active
Unit NameStatusCIR ClaimedPOI Transfer
Chesterfield 6Deactivated Generator51.6Yes
AG2-440Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator60.0Yes
AG2-069Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator90.0Yes
AH1-220Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator60.0Yes
AG2-441Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator75.0Yes
AH1-552Active
Unit NameStatusCIR ClaimedPOI Transfer
Chalk Point Unit 1Deactivated Generator333.0No
Chalk Point Unit 2Deactivated Generator337.2No
AG2-384Active
Unit NameStatusCIR ClaimedPOI Transfer
Possum Point 5Deactivated Generator24.0Yes
AG2-093Active
Unit NameStatusCIR ClaimedPOI Transfer
Spruance NUG 1Deactivated Generator100.0Yes
AH1-138Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator8.4Yes
AG2-618Active
Unit NameStatusCIR ClaimedPOI Transfer
Morgantown Unit 1Deactivated Generator35.75No
Morgantown Unit 2Deactivated Generator35.75No
AG2-152Active
Unit NameStatusCIR ClaimedPOI Transfer
Chesterfield 6Deactivated Generator52.0Yes
Yorktown 3Deactivated Generator27.0Yes
AH1-227Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator30.78Yes
AG2-450Active
Unit NameStatusCIR ClaimedPOI Transfer
LoganDeactivated Generator115.3No
AH1-221Active
Unit NameStatusCIR ClaimedPOI Transfer
Possum Point 5Deactivated Generator45.0Yes
AH1-071Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator12.0Yes
AG2-193Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator12.0Yes
AG2-095Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator10.8Yes
AG2-068Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator60.0Yes
AG2-077Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator120.0Yes
AG2-451Active
Unit NameStatusCIR ClaimedPOI Transfer
Chambers CCLPDeactivated Generator123.0No
AG2-161Active
Unit NameStatusCIR ClaimedPOI Transfer
FRACKVILLE WHEELABRATOR 1Deactivated Generator18.1No
AG2-213Active
Unit NameStatusCIR ClaimedPOI Transfer
Yorktown 3Deactivated Generator48.0Yes
AH1-721Active
Unit NameStatusCIR ClaimedPOI Transfer
Cooper 1Future Deactivation116.0Yes

Cost Summary

Table below shows a summary of the total planning level cost estimates for each individual New Service Request received by PJM and studied in Transition Cycle 2 Phase I. These network upgrade costs are subject to change as a result of a facility study performed by the Interconnected Transmission Owner during the Phase II and III System Impact Studies.

Network Cost Summary for all projects of Transition Cycle 2 Phase I
Project IDTransmission Owner Interconnection Facilities (TOIF)Physical Interconnection Network UpgradesSystem Reliability Network UpgradesAffected System Study ReinforcementsAdditional ChargesTotal CostCost Details
AG2-005$0$0$57,703,292$0$0$57,703,292
AG2-010$1,200,000$18,000,000$3,498,668$0$0$22,698,668
AG2-014$0$0$164,294$0$352,000$516,294
AG2-016$1,015,090$1,352,985$0$0$57,200$2,425,275
AG2-029$0$31,735,000$114,010,999$0$0$145,745,999
AG2-037$33,300$0$144,300$0$0$177,600
AG2-049$0$0$0$0$0$0
AG2-057$29,400$24,500$0$0$3,500$57,400
AG2-061$0$0$0$0$350,000$350,000
AG2-062$4,374,112$0$0$0$59,600$4,433,712
AG2-063$269,015$4,660,322$22,661,505$0$19,467$27,610,309
AG2-068$1,100,000$7,500,000$8,118,601$0$0$16,718,601
AG2-069$1,100,000$7,500,000$12,178,116$0$0$20,778,116
AG2-072$0$13,194,000$242,998,405$222,000,000$0$478,192,405
AG2-073$755,000$9,860,000$13,796,988$0$0$24,411,988
AG2-074$922,531$2,109,305$0$0$0$3,031,836
AG2-077$0$0$68,125,603$0$0$68,125,603
AG2-081$755,000$21,340,000$2,500,908$11,571,429$0$36,167,336
AG2-082$0$2,326,000$0$0$0$2,326,000
AG2-085$0$0$0$0$176,000$176,000
AG2-086$0$26,400,000$0$0$0$26,400,000
AG2-088$3,500,000$8,000,000$25,765,763$0$0$37,265,763
AG2-090$0$0$0$0$0$0
AG2-091$0$0$0$0$0$0
AG2-093$1,500,000$17,500,000$31,582,553$0$0$50,582,553
AG2-095$0$0$0$0$0$0
AG2-104$0$0$62,232,419$0$2,232,000$64,464,419
AG2-106$0$0$25,668,070$0$1,280,000$26,948,070
AG2-107$0$0$25,668,070$0$1,280,000$26,948,070
AG2-109$1,787,012$12,051,999$361,264$0$58,400$14,258,675
AG2-111$0$0$4,824,591$0$0$4,824,591
AG2-112$0$0$5,057,464$0$0$5,057,464
AG2-114$1,800,000$45,000,000$27,967,764$0$0$74,767,764
AG2-119$823,627$3,550,485$0$0$59,600$4,433,712
AG2-120$0$16,500,000$0$0$0$16,500,000
AG2-121$0$0$0$0$0$0
AG2-124$0$0$0$0$0$0
AG2-125$0$0$0$0$0$0
AG2-126$0$0$335,819$0$352,000$687,819
AG2-148$0$10,908,000$646,603$0$0$11,554,603
AG2-149$0$17,839,000$79,781,179$0$0$97,620,179
AG2-151$1,200,000$16,200,000$19,302,389$0$0$36,702,389
AG2-152$0$18,578,995$20,522,088$0$0$39,101,083
AG2-159$7,125,000$9,685,000$2,002,480$0$0$18,812,480
AG2-161$922,531$2,109,305$48,129,277$0$0$51,161,113
AG2-162$0$57,163,800$0$0$0$57,163,800
AG2-163$0$0$1,159,717$0$352,000$1,511,717
AG2-164$0$57,163,800$56,120,342$0$12,890,000$126,174,142
AG2-165$0$63,312,070$116,795,770$0$0$180,107,840
AG2-166$922,531$2,109,305$0$0$0$3,031,836
AG2-171$1,200,000$16,200,000$25,063,421$0$0$42,463,421
AG2-176$807,044$3,478,999$46,764,271$0$58,400$51,108,714
AG2-179$2,000,000$5,310,000$14,641,159$200,840$0$22,152,000
AG2-181$0$25,500,000$19,580,000$0$0$45,080,000
AG2-182$2,200,000$29,000,000$0$0$0$31,200,000
AG2-184$0$17,307,587$11,352,284$0$0$28,659,871
AG2-188$1,500,000$17,500,000$34,849,620$0$0$53,849,620
AG2-191$0$0$400,254$0$352,000$752,254
AG2-192$0$0$299,746$0$176,000$475,746
AG2-193$0$0$0$0$0$0
AG2-198$750,000$8,750,000$25,734,941$0$0$35,234,941
AG2-200$285,787$193,050$3,682,921$0$57,200$4,218,958
AG2-206$411,814$7,363,327$667,118$0$29,800$8,472,059
AG2-208$0$0$3,284,980$0$0$3,284,980
AG2-212$0$63,312,070$116,795,770$0$304,000$180,411,840
AG2-213$1,200,000$16,200,000$34,986,675$0$0$52,386,675
AG2-215$0$0$48,047,118$0$0$48,047,118
AG2-216$0$0$0$0$0$0
AG2-219$0$57,163,800$85,756,857$0$304,000$143,224,657
AG2-220$411,814$7,479,853$432,571$0$29,800$8,354,037
AG2-221$0$0$278,989$0$0$278,989
AG2-230$0$3,935,000$9,086$0$0$3,944,086
AG2-236$58,800$49,000$0$0$7,000$114,800
AG2-237$0$0$2,770,165$0$0$2,770,165
AG2-238$0$0$0$0$0$0
AG2-239$0$0$0$0$0$0
AG2-240$0$0$0$0$0$0
AG2-245$0$32,726,152$18,461,478$0$0$51,187,630
AG2-248$0$8,930,000$0$0$0$8,930,000
AG2-249$403,522$7,373,236$20,592,369$0$29,200$28,398,328
AG2-250$403,522$7,373,236$20,592,369$0$29,200$28,398,328
AG2-262$0$0$0$0$0$0
AG2-270$3,500,000$14,500,000$38,189,600$0$0$56,189,600
AG2-272$0$4,652,000$48,651$0$0$4,700,651
AG2-279$925,715$1,174,235$0$0$57,200$2,157,150
AG2-281$1,250,000$50,250,000$6,552,699$0$0$58,052,699
AG2-288$4,374,112$0$9,809,215$0$59,600$14,242,927
AG2-289$0$8,548,500$0$0$0$8,548,500
AG2-290$0$8,548,500$0$0$352,000$8,900,500
AG2-297$1,250,000$2,500,000$0$0$0$3,750,000
AG2-298$755,000$11,215,000$14,665,904$0$0$26,635,904
AG2-300$4,374,112$0$0$0$59,600$4,433,712
AG2-304$3,500,000$8,000,000$6,102,427$0$0$17,602,427
AG2-310$0$4,720,000$631,209$0$0$5,351,209
AG2-311$0$26,432,226$12,008,717$0$0$38,440,943
AG2-320$3,500,000$8,000,000$3,449,839$0$0$14,949,839
AG2-327$411,814$7,363,327$139,011$0$29,800$7,943,952
AG2-328$0$63,312,070$116,795,770$0$304,000$180,411,840
AG2-329$0$10,908,000$1,618,069$0$352,000$12,878,069
AG2-330$0$63,312,070$0$0$12,890,000$76,202,070
AG2-331$0$57,163,800$45,381$0$304,000$57,513,181
AG2-332$0$8,930,000$0$0$352,000$9,282,000
AG2-338$2,100,000$1,750,000$6,933,189$0$0$10,783,189
AG2-339$2,100,000$1,750,000$17,333,101$0$0$21,183,101
AG2-341$3,200,000$5,000,000$1,517,742$0$0$9,717,742
AG2-343$0$5,027,000$412,002$0$0$5,439,002
AG2-344$0$0$539,908$0$352,000$891,908
AG2-345$0$0$0$0$352,000$352,000
AG2-347$1,250,000$12,500,000$65,749,049$0$0$79,499,049
AG2-356$0$0$278,989$0$0$278,989
AG2-360$0$10,452,000$90,018$0$0$10,542,018
AG2-363$900,000$2,050,000$100,482,398$14,193,264$175,000$117,800,662
AG2-364$900,000$2,050,000$66,987,604$9,462,138$175,000$79,574,742
AG2-365$807,044$13,673,373$11,085,734$0$58,400$25,624,551
AG2-366$3,200,000$2,500,000$112,878,868$0$0$118,578,868
AG2-369$2,200,000$15,000,000$8,027,404$0$0$25,227,404
AG2-370$0$0$7,600,000$0$352,000$7,952,000
AG2-378$269,015$4,660,322$22,661,505$0$19,467$27,610,309
AG2-380$0$0$0$0$0$0
AG2-382$1,750,000$9,500,000$632,154$0$0$11,882,154
AG2-384$3,500,000$14,000,000$43,897$0$0$17,543,897
AG2-385$269,015$4,660,322$8,393,150$0$19,467$13,341,954
AG2-400$0$0$3,095,410$0$176,000$3,271,410
AG2-401$0$0$0$0$0$0
AG2-402$0$0$0$0$176,000$176,000
AG2-403$442,383$16,348,179$0$0$30,400$16,820,962
AG2-404$442,383$16,348,179$0$0$30,400$16,820,962
AG2-405$0$0$0$0$0$0
AG2-406$0$0$0$0$0$0
AG2-408$0$0$0$0$0$0
AG2-411$823,627$3,550,485$10,098,813$0$59,600$14,532,525
AG2-418$823,627$12,974,686$66,928,102$0$59,600$80,786,015
AG2-420$285,787$100,100$1,337,050$0$57,200$1,780,137
AG2-423$823,627$16,449,706$5,974,200$0$59,600$23,307,133
AG2-424$755,000$8,385,000$5,174,261$1,891,549$0$16,205,810
AG2-426$1,200,000$16,200,000$33,610,021$0$0$51,010,021
AG2-427$3,200,000$20,500,000$50,127,691$0$0$73,827,691
AG2-428$3,200,000$30,000,000$219,900,998$0$0$253,100,998
AG2-429$823,627$16,449,706$28,156,946$0$59,600$45,489,879
AG2-430$922,531$2,109,305$60,312,937$0$0$63,344,772
AG2-436$2,200,000$29,000,000$225,783,917$0$0$256,983,917
AG2-438$0$0$0$0$0$0
AG2-439$0$0$0$0$0$0
AG2-440$600,000$4,300,000$91,667,498$0$0$96,567,498
AG2-441$600,000$4,300,000$114,584,719$0$0$119,484,719
AG2-442$1,200,000$8,600,000$129,445,338$0$0$139,245,338
AG2-444$0$33,079,168$9,582,064$0$0$42,661,232
AG2-447$0$0$0$0$0$0
AG2-448$823,627$15,332,146$25,310,241$0$59,600$41,525,614
AG2-449$0$57,163,800$0$0$304,000$57,467,800
AG2-450$1,250,000$10,000,000$0$0$0$11,250,000
AG2-451$300,000$1,500,000$0$0$0$1,800,000
AG2-453$1,800,000$45,000,000$89,508,926$1,856,124$0$138,165,050
AG2-456$140,035$2,432,807$57,889,355$0$10,133$60,472,330
AG2-457$140,035$2,432,807$57,889,355$0$10,133$60,472,330
AG2-458$0$0$0$0$0$0
AG2-459$0$0$0$0$0$0
AG2-460$0$0$0$0$0$0
AG2-469$1,500,000$17,500,000$77,231,945$0$0$96,231,945
AG2-476$0$0$0$0$0$0
AG2-477$0$0$0$0$0$0
AG2-478$0$0$0$0$0$0
AG2-479$0$0$0$0$0$0
AG2-481$0$0$0$0$0$0
AG2-484$0$0$0$0$0$0
AG2-487$0$0$0$0$0$0
AG2-491$0$0$706,478$0$176,000$882,478
AG2-492$0$0$164,294$0$176,000$340,294
AG2-505$823,627$16,106,946$14,765,067$0$59,600$31,755,240
AG2-515$843,231$5,363,341$9,885,273$0$60,800$16,152,645
AG2-516$1,800,000$35,000,000$0$0$0$36,800,000
AG2-518$0$3,853,000$3,687,496$0$0$7,540,496
AG2-519$0$16,775,000$0$0$0$16,775,000
AG2-522$0$16,200,000$6,240,570$0$0$22,440,570
AG2-524$1,800,000$35,000,000$2,800,000$42,433$0$39,642,433
AG2-532$925,715$1,224,285$39,796,796$0$57,200$42,003,996
AG2-533$925,715$1,224,285$40,491,190$0$57,200$42,698,390
AG2-534$925,715$1,224,285$45,127,747$0$57,200$47,334,947
AG2-535$823,627$12,582,335$46,472,286$0$59,600$59,937,848
AG2-541$1,200,000$16,200,000$19,973,877$0$0$37,373,877
AG2-544$900,000$3,750,000$0$0$175,000$4,825,000
AG2-545$900,000$3,750,000$0$0$175,000$4,825,000
AG2-548$0$7,417,500$12,074,648$0$0$19,492,148
AG2-550$0$0$22,991,797$0$352,000$23,343,797
AG2-551$0$0$1,538,640$0$176,000$1,714,640
AG2-553$1,945,000$6,300,000$0$0$0$8,245,000
AG2-561$0$0$0$0$0$0
AG2-562$0$111,000$0$0$0$111,000
AG2-564$0$16,698,401$0$0$0$16,698,401
AG2-566$750,000$8,750,000$6,950,656$0$0$16,450,656
AG2-568$0$18,139,000$0$0$0$18,139,000
AG2-570$1,100,000$14,500,000$92,859,318$0$0$108,459,318
AG2-571$1,100,000$14,500,000$18,818,261$0$0$34,418,261
AG2-575$0$0$7,576,273$38,579$350,000$7,964,852
AG2-581$2,200,000$29,000,000$43,714,336$0$0$74,914,336
AG2-582$7,130,657$0$174,887,472$0$60,800$182,078,929
AG2-583$1,500,000$17,500,000$20,995,576$0$0$39,995,576
AG2-585$0$0$0$43,191$350,000$393,191
AG2-589$0$17,647,804$0$0$0$17,647,804
AG2-615$823,627$15,868,606$195,865,978$0$59,600$212,617,811
AG2-616$625,000$12,000,000$341,652$0$0$12,966,652
AG2-617$9,000,000$1,200,000$0$0$0$10,200,000
AG2-618$200,000$3,500,000$0$0$0$3,700,000
AG2-621$4,374,112$0$0$0$59,600$4,433,712
AG2-625$943,590$1,260,035$0$0$57,200$2,260,825
AG2-626$967,424$1,307,701$0$0$57,200$2,332,325
AG2-627$1,250,000$24,250,000$0$0$0$25,500,000
AG2-637$0$16,775,000$41,514,707$0$0$58,289,707
AG2-646$3,500,000$7,000,000$104,397,510$0$0$114,897,510
AG2-654$0$0$0$0$0$0
AG2-657$0$20,670,801$180,499$0$0$20,851,300
AG2-658$4,374,112$0$252,333,790$0$59,600$256,767,502
AG2-659$1,200,000$16,200,000$9,794,997$0$0$27,194,997
AG2-660$0$0$14,386,707$1,024,494$87,500$15,498,702
AG2-661$0$0$0$0$0$0
AG2-665$0$7,417,500$12,074,648$0$352,000$19,844,148
AG2-670$1,175,000$20,715,000$2,341,100$2,574,101$0$26,805,202
AG2-675$0$0$0$0$350,000$350,000
AH1-004$1,145,000$14,420,000$3,334,641$15,428,571$0$34,328,212
AH1-005$411,814$7,479,853$279,055$0$29,800$8,200,521
AH1-012$1,500,000$17,500,000$573,823$0$0$19,573,823
AH1-027$1,250,000$6,000,000$0$0$0$7,250,000
AH1-033$0$0$0$0$0$0
AH1-034$755,000$9,310,000$40,843,100$137,146$0$51,045,246
AH1-035$0$18,000,000$0$0$0$18,000,000
AH1-040$1,200,000$16,200,000$4,419,812$0$0$21,819,812
AH1-042$1,200,000$16,200,000$79,416,415$0$0$96,816,415
AH1-044$0$0$112,788,337$8,812,294$87,500$121,688,131
AH1-047$1,500,000$35,000,000$0$0$0$36,500,000
AH1-050$274,542$5,483,235$12,699,556$0$19,867$18,477,201
AH1-051$274,542$5,483,235$7,619,826$0$19,867$13,397,470
AH1-054$919,757$1,212,368$0$0$57,200$2,189,325
AH1-055$0$32,702,000$1,458,266$0$0$34,160,266
AH1-056$0$0$81,040,161$0$0$81,040,161
AH1-057$0$0$0$0$0$0
AH1-059$0$0$16,000,000$0$352,000$16,352,000
AH1-060$29,400$24,500$0$0$3,500$57,400
AH1-065$0$0$0$0$0$0
AH1-066$0$0$0$0$0$0
AH1-069$403,522$7,044,736$0$0$29,200$7,477,458
AH1-070$403,522$7,044,736$0$0$29,200$7,477,458
AH1-071$0$0$0$0$0$0
AH1-072$0$24,950,750$0$0$0$24,950,750
AH1-073$0$24,950,750$0$0$2,494,569$27,445,319
AH1-075$0$0$3,540,553$0$352,000$3,892,553
AH1-086$875,000$1,375,000$0$0$0$2,250,000
AH1-087$875,000$1,375,000$0$0$0$2,250,000
AH1-088$875,000$1,375,000$0$0$0$2,250,000
AH1-089$875,000$1,375,000$0$0$0$2,250,000
AH1-091$0$0$0$0$0$0
AH1-098$0$16,775,000$0$0$0$16,775,000
AH1-102$411,814$8,224,853$16,150,053$0$29,800$24,816,519
AH1-106$0$0$0$0$0$0
AH1-107$0$0$0$0$0$0
AH1-108$0$0$0$0$0$0
AH1-124$0$0$0$0$0$0
AH1-125$0$0$0$0$0$0
AH1-127$0$0$0$0$0$0
AH1-128$0$0$0$0$0$0
AH1-133$0$16,775,000$48,587$0$0$16,823,587
AH1-136$0$16,762,000$0$0$0$16,762,000
AH1-138$0$0$0$0$0$0
AH1-140$823,547$34,788,952$22,967,848$0$59,600$58,639,947
AH1-144$0$9,538,600$57,359$0$0$9,595,960
AH1-145$0$9,538,600$16,000$0$352,000$9,906,600
AH1-146$750,000$22,500,000$81,978,990$8,681,349$175,000$114,085,339
AH1-147$750,000$22,500,000$81,978,990$8,681,349$175,000$114,085,339
AH1-150$0$0$112,788,337$8,812,294$87,500$121,688,131
AH1-151$0$0$112,788,337$8,812,294$87,500$121,688,131
AH1-153$0$3,935,000$9,086$0$352,000$4,296,086
AH1-157$1,500,000$17,500,000$9,837,220$0$0$28,837,220
AH1-158$274,542$5,483,235$9,504,953$0$19,867$15,282,597
AH1-164$0$18,056,079$0$0$0$18,056,079
AH1-165$1,800,000$2,400,000$0$0$0$4,200,000
AH1-170$0$0$0$0$0$0
AH1-188$0$69,534,792$62,066$0$0$69,596,858
AH1-196$0$0$0$46,145$350,000$396,145
AH1-201$411,814$7,479,853$5,379,562$0$29,800$13,301,028
AH1-203$823,627$15,570,606$18,687,317$0$59,600$35,141,150
AH1-205$411,814$7,479,853$3,668,108$0$29,800$11,589,574
AH1-206$4,374,112$0$0$0$59,600$4,433,712
AH1-212$1,388,128$1,790,929$4,947,596$0$57,200$8,183,853
AH1-215$1,200,000$16,200,000$19,385,442$0$0$36,785,442
AH1-216$1,500,000$17,500,000$5,825,326$0$0$24,825,326
AH1-217$1,200,000$16,200,000$10,238,172$0$0$27,638,172
AH1-220$0$0$0$0$0$0
AH1-221$0$0$0$0$0$0
AH1-223$0$0$0$0$0$0
AH1-227$0$14,070,000$325,327$0$0$14,395,327
AH1-234$1,500,000$45,000,000$13,625,291$1,349,327$0$61,474,618
AH1-239$755,000$13,285,000$16,837,554$179,430$0$31,056,984
AH1-241$1,200,000$16,200,000$20,436,221$0$0$37,836,221
AH1-247$274,542$5,483,235$0$0$19,867$5,777,644
AH1-248$274,542$5,483,235$0$0$19,867$5,777,644
AH1-249$274,542$5,483,235$0$0$19,867$5,777,644
AH1-251$1,200,000$16,200,000$0$0$0$17,400,000
AH1-254$58,800$49,000$0$0$7,000$114,800
AH1-257$919,757$1,162,317$4,505,192$0$57,200$6,644,466
AH1-258$919,757$1,162,317$0$0$57,200$2,139,274
AH1-260$1,250,000$24,307,000$0$0$0$25,557,000
AH1-261$10,000,000$2,000,000$0$0$0$12,000,000
AH1-263$3,200,000$4,500,000$10,204,615$0$0$17,904,615
AH1-265$1,250,000$27,000,000$0$0$0$28,250,000
AH1-268$411,814$8,224,853$7,396,235$0$29,800$16,062,702
AH1-269$0$5,487,067$947,937$0$0$6,435,004
AH1-271$1,750,000$9,500,000$361,228$0$0$11,611,228
AH1-272$0$31,073,000$11,224$0$0$31,084,224
AH1-274$0$18,300,000$0$0$0$18,300,000
AH1-280$0$0$5,071,937$0$0$5,071,937
AH1-281$755,000$13,495,000$0$0$0$14,250,000
AH1-282$0$34,166,000$0$0$0$34,166,000
AH1-283$884,166$32,396,358$0$0$60,800$33,341,324
AH1-285$1,500,000$45,000,000$2,930,824$0$0$49,430,824
AH1-292$0$0$0$0$0$0
AH1-298$1,000,000$19,000,000$0$0$0$20,000,000
AH1-302$0$0$0$0$352,000$352,000
AH1-304$0$0$0$0$0$0
AH1-305$0$0$0$0$0$0
AH1-306$0$0$0$0$0$0
AH1-308$0$0$4,655,658$0$352,000$5,007,658
AH1-309$0$0$0$0$352,000$352,000
AH1-311$0$0$0$0$0$0
AH1-313$823,627$4,006,875$142,145,060$0$59,600$147,035,162
AH1-314$0$4,763,000$2,528,754$0$0$7,291,754
AH1-323$3,500,000$25,000,000$5,811,987$0$0$34,311,987
AH1-324$1,500,000$17,500,000$3,910,688$0$0$22,910,688
AH1-327$0$0$0$0$0$0
AH1-328$0$0$0$0$0$0
AH1-334$985,299$1,293,401$0$0$57,200$2,335,900
AH1-337$0$18,410,000$269,114$0$0$18,679,114
AH1-338$1,500,000$35,000,000$24,187,953$610,019$0$61,297,973
AH1-339$0$4,363,000$23,040,195$0$0$27,403,195
AH1-340$823,627$16,104,903$8,699,919$0$59,600$25,688,049
AH1-341$1,500,000$35,000,000$3,121,947$43,953$0$39,665,900
AH1-343$1,200,000$16,200,000$23,156,036$0$0$40,556,036
AH1-345$0$0$0$0$0$0
AH1-348$0$0$0$0$0$0
AH1-357$140,035$2,432,807$14,473,306$0$10,133$17,056,281
AH1-358$140,035$2,432,807$16,862,525$0$10,133$19,445,500
AH1-359$140,035$2,432,807$14,473,306$0$10,133$17,056,281
AH1-360$140,035$2,432,807$16,862,525$0$10,133$19,445,500
AH1-367A$807,044$3,478,999$0$0$58,400$4,344,443
AH1-377$1,500,000$17,500,000$61,547,600$0$0$80,547,600
AH1-380$1,250,000$31,000,000$0$0$0$32,250,000
AH1-387$884,766$32,396,358$0$0$60,800$33,341,924
AH1-391$0$6,993,000$7,786,453$0$0$14,779,453
AH1-392$0$17,748,000$0$0$0$17,748,000
AH1-396$0$0$2,456,968$0$0$2,456,968
AH1-397$0$0$0$0$0$0
AH1-399$0$0$0$0$0$0
AH1-408$1,200,000$16,200,000$15,982,827$0$0$33,382,827
AH1-426$411,814$1,775,242$60,143,935$0$29,800$62,360,791
AH1-426A$411,814$1,775,242$30,072,346$0$29,800$32,289,202
AH1-427$755,000$11,465,000$49,559,186$92,624$0$61,871,809
AH1-439$1,500,000$17,500,000$20,497,788$0$0$39,497,788
AH1-452$0$0$0$0$0$0
AH1-460$823,627$16,129,356$15,227,239$0$59,600$32,239,822
AH1-461$0$20,819,328$0$0$0$20,819,328
AH1-482$0$0$24,513$0$352,000$376,513
AH1-487$0$0$1,735,851$0$0$1,735,851
AH1-490$0$0$0$0$0$0
AH1-491$0$0$0$0$0$0
AH1-528$2,200,000$29,000,000$155,398,160$0$0$186,598,160
AH1-535$0$32,928,423$25,767$0$0$32,954,190
AH1-536$1,250,000$24,250,000$2,740,566$0$0$28,240,566
AH1-537$0$32,804,000$1,244,140$0$0$34,048,140
AH1-539$0$4,763,000$118,966,906$0$0$123,729,906
AH1-541$1,800,000$3,400,000$32,897,305$0$0$38,097,305
AH1-542$823,627$16,449,706$0$0$59,600$17,332,933
AH1-543$1,500,000$45,000,000$3,657,373$413,738$0$50,571,111
AH1-545$843,231$26,288,724$0$0$60,800$27,192,755
AH1-546$1,500,000$17,500,000$16,580,024$0$0$35,580,024
AH1-552$4,000,000$2,000,000$0$0$0$6,000,000
AH1-563$0$0$2,600,000$0$350,000$2,950,000
AH1-564$0$0$500,000$0$350,000$850,000
AH1-567$0$0$0$0$350,000$350,000
AH1-570$377,500$4,767,500$0$0$0$5,145,000
AH1-571$377,500$4,767,500$0$0$0$5,145,000
AH1-577$0$2,398,008$115,789$0$0$2,513,798
AH1-578$0$2,398,008$84,211$0$528,000$3,010,219
AH1-580$0$2,326,000$0$0$352,000$2,678,000
AH1-584$416,667$37,666,667$38,229,021$0$0$76,312,354
AH1-585$416,667$37,666,667$38,229,021$0$0$76,312,354
AH1-586$416,667$37,666,667$41,400,457$0$0$79,483,790
AH1-587$823,627$16,501,856$244,107,909$0$59,600$261,492,992
AH1-588$420,105$2,432,807$211,443,375$0$30,400$214,326,687
AH1-589$420,105$2,432,807$174,694,828$0$30,400$177,578,140
AH1-617$0$17,307,587$10,811,730$0$0$28,119,317
AH1-634$0$0$9,895,095$0$0$9,895,095
AH1-637$0$0$0$0$0$0
AH1-641$625,000$12,000,000$102,506$0$0$12,727,506
AH1-644$0$18,115,000$3,705,586$0$0$21,820,586
AH1-661$0$0$0$0$0$0
AH1-664$572,500$8,297,500$22,363,686$0$0$31,233,686
AH1-665$572,500$8,297,500$17,890,841$0$0$26,760,841
AH1-666$1,145,000$18,730,000$16,756,003$0$0$36,631,003
AH1-667$285,787$100,100$494,900$0$57,200$937,987
AH1-669$0$16,775,000$14,087,980$0$0$30,862,980
AH1-670$1,800,000$45,000,000$154,635,329$0$0$201,435,329
AH1-672$1,250,000$4,000,000$6,548,595$0$0$11,798,595
AH1-673$1,800,000$35,000,000$0$0$0$36,800,000
AH1-676$3,500,000$8,000,000$293,294,893$0$0$304,794,893
AH1-677$0$0$0$0$0$0
AH1-678$0$0$0$0$0$0
AH1-679$0$0$1,477,423$0$0$1,477,423
AH1-680$265,631$27,079,653$0$0$60,800$27,406,084
AH1-681$0$0$5,547,973$0$0$5,547,973
AH1-682$0$0$15,322,887$0$0$15,322,887
AH1-683$0$0$18,247,274$0$0$18,247,274
AH1-684$0$0$0$0$0$0
AH1-685$0$0$0$0$0$0
AH1-686$0$0$0$0$1,228,000$1,228,000
AH1-687$0$0$17,273,920$0$0$17,273,920
AH1-690$843,231$40,872,535$1,253,883,889$0$60,800$1,295,660,455
AH1-691$0$0$18,972,231$0$0$18,972,231
AH1-692$0$0$18,972,231$0$0$18,972,231
AH1-693$0$0$0$0$0$0
AH1-694$0$0$13,135,736$0$0$13,135,736
AH1-695$790,461$4,345,113$92,018,074$0$57,200$97,210,848
AH1-696$0$0$0$0$0$0
AH1-698$0$0$0$0$350,000$350,000
AH1-699$58,800$49,000$0$0$7,000$114,800
AH1-701$0$0$0$0$0$0
AH1-702$0$0$0$0$350,000$350,000
AH1-703$0$0$0$0$0$0
AH1-704$0$0$0$0$0$0
AH1-705$0$0$0$0$0$0
AH1-706$58,800$49,000$0$0$7,000$114,800
AH1-707$0$0$89,257,786$0$0$89,257,786
AH1-710$0$0$7,020,037$0$0$7,020,037
AH1-711$58,800$49,000$203,511,088$0$7,000$203,625,888
AH1-712$2,100,000$3,500,000$124,170,738$0$0$129,770,738
AH1-713$0$0$0$0$0$0
AH1-714$0$0$12,007,566$1,279,015$350,000$13,636,581
AH1-715$0$0$16,575,240$0$0$16,575,240
AH1-716$2,200,000$29,000,000$251,329,336$0$0$282,529,336
AH1-717$1,000,000$1,000,000$17,321,591$0$0$19,321,591
AH1-718$0$0$0$0$350,000$350,000
AH1-719$0$111,000$0$0$0$111,000
AH1-720$58,800$0$5,577,857$0$7,000$5,643,657
AH1-721$3,175,000$22,020,000$80,096,578$6,058,310$0$111,349,888
AH1-722$0$0$21,827,760$0$0$21,827,760
AH1-723$2,100,000$3,500,000$144,696,392$0$0$150,296,392
AH1-725$19,000,000$2,000,000$0$0$0$21,000,000
AH1-727$2,200,000$29,000,000$14,530,198$0$0$45,730,198
AH1-729$3,500,000$6,000,000$3,004,996$0$0$12,504,996
AH1-734$800,083$51,100$129,735$0$7,300$988,218
AH1-735$58,800$49,000$0$0$7,000$114,800
AH1-744$0$0$0$0$0$0
AH1-746$0$0$0$0$0$0

System Reinforcements

PJM performed generator deliverability load flow analysis for the New Service Requests in Transition Cycle 2 Phase I. Load flow analysis was performed to simulate Summer Peak, Light Load and Winter Peak conditions. The table below shows all the system reinforcements identified from generator deliverability load flow analysis. Short circuit and stability analyses are not performed as part of the Phase I System Impact Study. Short circuit and stability analyses will commence in the Phase II System Impact Study.

TORTEP ID / TO IDTitleTime EstimateTotal Cost Estimate ($)Projects with Cost AllocationContingent Projects
AECn7868 / ACEMickDelcorebuildr01

Rebuild 7.6 miles of Mickleton to Delco Tap 230 kV line.

54 to 66 Months
$34,200,000

AG2-347, AH1-584, AH1-585, AH1-586, AH1-634

AEP(Pending) /

05PETERM 138.0 kV to 05GLENL2 138.0 kV ckt 1 - Sag Study

12 to 24 Months
$40,000

AH1-144, AH1-145

AEP(Pending) / AEP-TC2-18502

05OLIVE 345.0 kV to 05COOK 345.0 kV ckt 1 - Sag Study

36 to 48 Months
$117,950

AG2-163, AG2-245, AG2-363, AG2-364, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391, AH1-482

AEP(Pending) / AEP-TC2-18505

05MISSIS 138.0 kV to 05DEER CRK1 138.0 kV ckt 1 - Replace risers

12 to 24 Months
$700,000

AG2-191, AG2-192

AEP(Pending) / AEP-TC2-18516

17P9700-EAST 345.0 kV to 05OLIVE 345.0 kV ckt 1 - AEP End Ratings

36 to 48 Months
$0

AG2-363, AG2-364, AG2-453, AG2-524, AG2-575, AG2-585, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-196, AH1-234, AH1-338, AH1-341, AH1-543, AH1-714

AEP(Pending) / AEP-TC2-18621

AE1-091_POI 138.0 kV to 05W.NEWTONSS 138.0 kV ckt 1 - Rebuild

32 to 48 Months
$36,260,000

AH1-075, AH1-339, AH1-539

AEP(Pending) / AEP-TC2-18624

AH1-133 TP 138.0 kV to 05TAZEWE 138.0 kV ckt 1 - Sag Study

6 to 12 Months
$10,000

AG2-184, AG2-360, AH1-133, AH1-617, AH1-721

AH1-644

AEP(Pending) / AEP-TC2-18625

05HODGIN_BP 138.0 kV to 05HAYES 138.0 kV ckt 1 - Replace Conductor

30 to 36 Months
$100,000

AG2-550, AG2-551, AG2-637, AH1-308, AH1-337

AEP(Pending) / AEP-TC2-18626

05FLTLCK 765.0 kV to 05GAVIN_RF 765.0 kV ckt 1 - Replace Equipment

30 to 36 Months
$2,000,000

AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328

AEP(Pending) / AEP-TC2-18627

AH1-133 TP 138.0 kV to 05TAZEWE 138.0 kV ckt 1 - Sag study

36 to 48 Months
$110,000

AG2-184, AG2-360, AH1-133, AH1-617, AH1-721

AH1-644

AEP(Pending) / AEP-TC2-18630

05BOXWD 138.0 kV to 05CLIFFR 138.0 kV ckt 1 - Rebuild

24 to 36 Months
$21,800,000

AH1-690

AG2-164, AG2-219

AEP(Pending) / AEP-TC2-18633

AH1-337 TP 138.0 kV to 05HODGIN_BP 138.0 kV ckt 1 - Replace conductor

12 to 18 Months
$100,000

AG2-550, AG2-551, AG2-637, AH1-308, AH1-337

AEP(Pending) / AEP-TC2-18634

05MARYSV 765.0 kV to 05MARYSV 345.0 kV ckt 2 - Add second XFMR

36 to 48 Months
$23,320,000

AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18635

05MARYSVL_RM 765.0 kV to 05MALIS 765.0 kV ckt 1 - Replace Equipment

24 to 36 Months
$24,200,000

AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18636

05COLLEEN SS 138.0 kV to 05JAMES RIVR 138.0 kV ckt 1 - Rebuild

24 to 48 Months
$18,000,000

AH1-690

AG2-164, AG2-219

AEP(Pending) / AEP-TC2-18639

05HAVILAND2 138.0 kV to 05HAVILAND1 138.0 kV ckt Z1 - Replace Equipment

24 to 36 Months
$800,000

AG2-370

AEP(Pending) / AEP-TC2-18642

05MEADOW 345.0 kV to 17REYNOLDS 345.0 kV ckt 1 - Replace Breakers

24 to 36 Months
$2,000,000

AG2-014, AG2-072, AG2-126, AG2-163, AG2-343, AG2-344, AG2-491, AG2-492

AEP(Pending) / AEP-TC2-18647

05JAMES RIVR 138.0 kV to 05SOAPSTONE 138.0 kV ckt 1 - Rebuild

24 to 48 Months
$40,000,000

AH1-690

AG2-164, AG2-219

AEP(Pending) / AEP-TC2-18651

05TWIN B 345.0 kV to 05MERIDN 345.0 kV ckt 1 - Sag Study

36 to 48 Months
$61,000

AG2-165, AG2-212, AG2-230, AG2-245, AG2-328, AH1-153, AH1-272

AG2-660, AH1-044, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18653

05MALIS 765.0 kV to 05VASSEL 765.0 kV ckt 1 - Replace Equipment

36 to 48 Months
$153,100,000

AG2-029, AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18654

05SALTV1 138.0 kV to AH1-133 TP 138.0 kV ckt 1 - Sag Study

6 to 12 Months
$10,000

AG2-360, AH1-721

AEP(Pending) / AEP-TC2-18655

05MUSEVILLE 138.0 kV to 05SMITHMTN 138.0 kV ckt 1 - Replace Switch

36 to 48 Months
$500,000

AG2-152, AG2-272, AG2-311, AH1-314

AEP(Pending) / AEP-TC2-18659

05MARYSVL_RS 765.0 kV to 05MARYSV 765.0 kV ckt Z1 - Replace Equipment

24 to 36 Months
$9,500,000

AG2-029, AG2-072, AG2-164, AG2-165, AG2-212, AG2-219, AG2-245, AG2-328, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18663

05HAVILAND1 138.0 kV to 05E LIMA 138.0 kV ckt 1 - Sag Study / Rebuild

24 to 36 Months
$6,800,000

AG2-370

AEP(Pending) / AEP-TC2-18665

05CLIFFR 138.0 kV to 05COLLEEN SS 138.0 kV ckt 1 - Rebuild

24 to 36 Months
$14,700,000

AH1-690

AG2-164, AG2-219

AEP(Pending) / AEP-TC2-18670

17STILLWELL 345.0 kV to 05DUMONT 345.0 kV ckt 1 - Reconductor and Replace Equipment

36 to 48 Months
$26,060,000

AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-543, AH1-714

AEP(Pending) / AEP-TC2-18671

05SOAPSTONE 138.0 kV to 05SCOTSV 138.0 kV ckt 1 - Rebuild

32 to 48 Months
$40,000,000

AH1-690

AG2-164, AG2-219

AEP(Pending) / AEP-TC2-18673

05SCHRIS 138.0 kV to 05TECHDR 138.0 kV ckt 1 - Rebuild

18 to 24 Months
$4,750,000

AG2-310, AG2-518, AH1-269

AH1-144, AH1-145

AEP(Pending) / AEP-TC2-18675

05HARRISON 138.0 kV to 05ZUBER 138.0 kV ckt 1 - Rebuild Line

24 to 36 Months
$16,269,340

AG2-548, AG2-665, AH1-669

AEP(Pending) / AEP-TC2-18677

05DUMONT_RW 765.0 kV to 05DUMONT 765.0 kV ckt Z1 - Replace Breaker

36 to 42 Months
$4,000,000

AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-543, AH1-714

AEP(Pending) / AEP-TC2-18678

05HARRISON 138.0 kV to 05OBETZ 138.0 kV ckt 1 - Sag Study + Rebuild

24 to 36 Months
$31,000,000

AG2-444, AG2-548, AG2-665, AH1-669

AEP(Pending) / AEP-TC2-18679

05GAVIN 765.0 kV to 05MOUNTN 765.0 kV ckt 1 - Replace Equipement

48 to 72 Months
$14,200,000

AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18680

05MARYSV 765.0 kV to 05MARYSVL_RM 765.0 kV ckt Z1 - Replace Equipment

24 to 36 Months
$2,200,000

AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18681

05E LIMA 345.0 kV to 05SW LIM 345.0 kV ckt 1 - Rebuild

24 to 36 Months
$58,640,000

AG2-149, AH1-539, AH1-690, AH1-711

AEP(Pending) / AEP-TC2-18682

05MALISX 138.0 kV to 05MALIS 138.0 kV ckt ZB - Replace equipment

24 to 36 Months
$3,230,000

AG2-104, AG2-106, AG2-107

AEP(Pending) / AEP-TC2-18683

05CLNCHR 138.0 kV to 05ABINGD 138.0 kV ckt 1 - Sag Study

24 to 36 Months
$180,000

AG2-184, AH1-227, AH1-617, AH1-644

AEP(Pending) / AEP-TC2-18685

05TECHDR 138.0 kV to 05M FUNK 138.0 kV ckt 1 - Sag Study

36 to 48 Months
$190,000

AG2-310, AG2-518, AH1-269

AH1-144, AH1-145

AEP(Pending) / AEP-TC2-18686

05MADDOX 345.0 kV to 05E LIMA 345.0 kV ckt 1 - String the 2nd conductor

24 to 36 Months
$48,000,000

AG2-029, AG2-072, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18687

05HANGRCK_RJ 765.0 kV to 05HANG R 765.0 kV ckt Z1 - Replace Equipment

30 to 36 Months
$500,000

AG2-072, AG2-164, AG2-165, AG2-212, AG2-219, AG2-328, AG2-331, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18689

AG1-410 TP 345.0 kV to 05MADDOX 345.0 kV ckt 1 - string the 2nd circuit

24 to 36 Months
$7,250,000

AG2-029, AG2-072, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-400, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18690

05SMYTH 138.0 kV to 05ATKINS 138.0 kV ckt 1 - Sag Study

12 to 24 Months
$70,000

AG2-360, AH1-133, AH1-721

AH1-227

AEP(Pending) / AEP-TC2-18693

Greentown 765 kV to Marysville 765 kV - Greenfield Line

72 to 120 Months
$1,000,000,000

AG2-029, AG2-072, AG2-164, AG2-165, AG2-212, AG2-219, AG2-328, AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18695

05CONSTP 138.0 kV to 05BEAVER CR1 138.0 kV ckt 1 - Sag study

12 to 24 Months
$100,000

AG2-184, AH1-617, AH1-644

AEP(Pending) / AEP-TC2-18699

AG2-548 TP 138.0 kV to 05CORWIN 138.0 kV ckt 1 - Replace Equipment

6 to 12 Months
$300,000

AG2-548, AG2-665

AEP(Pending) / AEP-TC2-18700

05GUNN RD SW 345.0 kV to 05BOKESCRK 345.0 kV ckt 1- Rebuild

24 to 36 Months
$66,000,000

AG2-029, AH1-539, AH1-690, AH1-711

AEP(Pending) / AEP-TC2-18701

AF2-205 TP 345.0 kV to 17REYNOLDS 345.0 kV ckt 1 - AEP end ratings

TBD
$0

AH1-482

AEP(Pending) / AEP-TC2-18702

05SCOTSV 138.0 kV to AE1-108 POI 138.0 kV ckt 1 - Rebuild

24 to 36 Months
$3,800,000

AH1-690

AG2-164, AG2-219

AEP(Pending) / AEP-TC2-18703

05HARBER 138.0 kV to 05SOFTSH 138.0 kV ckt 1 - Rebuild

48 to 72 Months
$23,000,000

AG2-184, AH1-617, AH1-644

AEP(Pending) / AEP-TC2-18704

05SMITHMTN 138.0 kV to 05LEESVI 138.0 kV ckt 1 - Rebuild

36 to 48 Months
$32,000,000

AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343

AEP(Pending) / AEP-TC2-18707

05ALLEN 345.0 kV to 05RPMONE 345.0 kV ckt 1 - Replace Equipment

36 to 48 Months
$5,000,000

AG2-029, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-400, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18708

05LEBANO 138.0 kV to 05ELKGARDNSS 138.0 kV ckt 1 - Replace Equipment

24 to 36 Months
$1,500,000

AG2-184, AH1-227, AH1-617, AH1-644, AH1-721

AH1-535

AEP(Pending) / AEP-TC2-18709

AG2-152 TP 138.0 kV to 05BANSTR 138.0 kV ckt 1 - Sag Study and Upgrade Equipment

36 to 48 Months
$50,000

AG2-152, AG2-311, AG2-541, AH1-343

AEP(Pending) / AEP-TC2-18711

05CLNCHR 138.0 kV to 05LEBANO 138.0 kV ckt 1 - Reconductor

36 to 48 Months
$1,600,000

AG2-184, AH1-227, AH1-617, AH1-644, AH1-721

AEP(Pending) / AEP-TC2-18712

05SOFTSH 138.0 kV to 05CONSTP 138.0 kV ckt 1 - Sag study

6 to 12 Months
$50,000

AG2-184, AH1-617, AH1-644

AEP(Pending) / AEP-TC2-18715

05MEADOW 345.0 kV to 17REYNOLDS 345.0 kV ckt 2 - Replace CBs

18 to 24 Months
$2,000,000

AG2-014, AG2-072, AG2-126, AG2-163, AG2-343, AG2-344, AG2-491, AG2-492

AEP(Pending) / AEP-TC2-18717

05BANSTR 138.0 kV to 05EDAN 2 138.0 kV ckt 1 - Sag Study and Replace Equipment

36 to 48 Months
$1,700,000

AG2-152, AG2-311, AG2-541, AH1-343

AEP(Pending) / AEP-TC2-18727

05CLYTR1 138.0 to 05SCHRIS 138 ckt 1 - Sag study

24 to 36 Months
$360,000

AG2-310, AG2-518, AH1-144, AH1-269

AH1-145

AEP(Pending) / AEP-TC2-18729

05CORWIN 138kV – 05MILTON SS 138kV - Replace Equipment

24 to 36 Months
$250,000

AG2-548, AG2-665

AEP(Pending) / AEP-TC2-18730

05W.NEWTONSS 138kV – 05E LIMA 138kV - Rebuild

36 to 48 Months
$19,500,000

AH1-075, AH1-339, AH1-539

AEP(Pending) / AEP-TC2-18731

05WOLFCK 138kV to 05W.WATERT 138kV ckt 1 - Replace Equipment

24 to 36 Months
$100,000

AH1-690

AG2-660, AH1-044, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18732

05RPMONE 345kV to AG1-410 TP 345kV ckt 1 - Replace Equipment

36 to 48 Months
$4,500,000

AG2-029, AG2-072, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-400, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

AEP(Pending) / AEP-TC2-18733

05BOKESCRK 345kV to 05MARYSV 345kV ckt 1 - Reconductor

48 to 52 Months
$6,810,000

AG2-029, AH1-539, AH1-690, AH1-711

AEP(Pending) / AEP-TC2-18751

05KYGER 345kV to 05SPORN 345kV ckt 1 - Replace Equipment and Sag Study

48 to 60 Months
$5,052,000

AG2-072, AG2-164, AG2-219, AG2-363, AG2-364, AG2-660, AH1-044, AH1-055, AH1-150, AH1-151, AH1-537, AH1-721

AEP(Pending) / AEP-TC2-18798

05ELDERBERRY 345kV – 05DUMONT 345kV ckt 1 - Rebuild

60 to 72 Months
$44,100,000

AG2-245, AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391

AEP(Pending) / AEP-TC2-18819

06PIERCE 345kV to 05MARQUIS 345kV ckt 1 - Replace Equipment

36 to 48 Months
$3,300,000

AG2-072, AG2-164, AG2-219, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-537

AEP(Pending) / AEP-TC2-18821

AEP Reinforcements for DEOK New Sub and New 345kV Line from Tanner's Creek

72 to 84 Months
$6,700,000

AG2-072, AG2-165, AG2-212, AG2-328

AEP(Pending) / AEPAPRJV002

Perform sag study on 397 ACSR between Clifford and Boxwood (13.7 miles)

24 to 36 Months
$82,200

AH1-690

AG2-164, AG2-219

AEP(Pending) / AEPAPRJV004

Replace wavetrap @ New London

18 to 24 Months
$260,000

AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343

AEP(Pending) / AEPAPRJV006_2

Sag Study 397 ACSR between James River and Soapstone ~10 miles

24 to 36 Months
$60,000

AH1-690

AG2-164, AG2-219

AEP(Pending) / AEPI0020K

Replace Olive Riser Sub Cond 2874 ACSR (72/7)

12 to 18 Months
$150,000

AG2-163, AG2-245, AG2-363, AG2-364, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391, AH1-482

AEP(Pending) / AEPSERG03

AF1-268 TP 138 KV to 05DESOTO 138 KV ckt 1 - Rebuild

18 to 24 Months
$2,047,500

AG2-550, AG2-551, AG2-637, AH1-308, AH1-337

AEPb3788.1 / B3788.1

Replace limiting station elements at Kyger Creek

Nov 18 2027
Contingent

AG2-072, AG2-219, AG2-363, AG2-453, AH1-055, AH1-537, AH1-721

AEPb3851.1 / B3851.1

Rebuild Allen-RP Mone 345kV

Jun 01 2027
Contingent

AG2-029, AG2-163, AG2-363, AG2-400, AG2-453, AH1-670

AEPb3878.1

Upgrade 765 kV circuit breakers 'B' and 'B2' to 5000A 50kA breakers at Marysville Station

Jun 01 2029
Contingent

AG2-029, AG2-072, AG2-363, AG2-453, AH1-670

AEPb3888.1

Preform sag study and complete mitigations on the 138 kV line between East Leipsic and the AE2-072 tap (Lammer) to allow line's conductor to operate to its maximum operating temperature (MOT).

Jun 01 2029
Contingent

AH1-690, AH1-735

AEPb4000.1

Add two 765 kV breakers at Amos Substation to expand the breaker and a half scheme to accommodate the new Amos-Welton Spring 765 kV line (Projected ISD 6/1/2029)

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

AEPb4000.207

Leesville Station Upgrade 138 kV

Jun 01 2029
Contingent

AG2-152, AG2-311

AEPb4000.210

Rebuild 7 miles of Otter - Johnson Mountain 138 kV line.

Jun 01 2029
Contingent

AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343

AEPb4000.211

Rebuild 6.5 miles of Johnson Mountain - New London 138 kV line

Jun 01 2029
Contingent

AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343

AEPn5613 / AEPA0014a

Rebuild 0.9 miles of the Otter - Alta Vista 138 kV line.

Nov 21 2027
Contingent

AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343

AEPn5808 / N5808

CON Upgrade_AEP: eliminate the Eugene stuck breaker contingency. (AMIL upgrade will not be required)

May 15 2026
Contingent

AG2-363, AH1-670

AEPn5857 / N5857

Rebuild / reconductor 10 miles of ACSR ~ 477 ~ 26/7 ~ HAWK- Conductor Section 1.

24 to 36 Months
$19,552,000

AH1-664, AH1-665, AH1-666, AH1-721

AEPn6263.2 / AEPO0015b

Replace 600 Amp Sw at Harrison

18 to 24 Months
Contingent

AG2-548, AG2-665, AH1-669

AEPn6525.2 / AEPO0026d

Replace three Sub Cond 1590 AAC 61 Str at Fremont

18 to 24 Months
$390,000

AG2-515, AH1-690, AH1-711

AEPn6525.3 / AEPO0026f

Rebuild 7 miles of 138 kV line between Fremont Center and First Energy's We [...] fact that they own a portion of the line conductor that limits the branch.

24 to 36 Months
$13,650,000

AG2-515, AH1-690, AH1-711

AEPn6594.1 / AEPA0044a

Rebuild 8.4 miles section of the Leesville - Alta Vista 138 kV line

Nov 21 2027
Contingent

AG2-152, AG2-311

AEPn6600 / AEPI0001a

Replace Dumont Circuit Breaker B1

18 to 24 Months
$3,900,000

AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-543, AH1-714

AEPn7619.1 / AEPI0032a

Replace 3000A non oil Circuit Breaker at Dumont

18 to 24 Months
$1,300,000

AG2-245, AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391

AEPn7619.2 / AEPI0032b

Reconductor/Rebuild 14 miles of ACSR ~ 954 ~ 45/7 ~ RAIL Dumont - Elderberry 345kV line

24 to 36 Months
$28,000,000

AG2-245, AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391

AEPn7683

Rebuild/reconductor 3.05 mi. of the 1275 ACSR/PE 54/19 conductor with 2-954 ACSR 54/7 conductor size with a SN rating of 1410 MVA.

24 to 36 Months
$18,460,000

AG2-029, AG2-072, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-400, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

AEPn7925.1 / AEPI0010a

Reconductor ~0.41 miles of the Sullivan – West Casey (Ameren) line

11 Months
$1,216,000

AG2-363

AEPn8383

A sag study will be required on the 3.65 miles of ACSR ~ 397.5 ~ 30/7 ~ LARK~ Conductor to determine what mitigation

24 to 36 Months
$78,000

AH1-690

AG2-164, AG2-219

AEPn8386

A sag study will be required on the ~4.0 miles of ACSR ~ 397.5 ~ 30/7 ~ LARK~ Conductor to determine what mitigation

24 to 36 Months
$78,000

AH1-690

AG2-164, AG2-219

AEPn9182.0 / AEPIMJMS01

Rebuild Olive - AF2-359 345kV

30 to 36 Months
$35,000,000

AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-714

AEPn9243.0 / AEPSERG13

Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles.

55 Months
$200,238,000

AG2-072

AEPn9669.0 / AEPO0027e

Replace Sub cond 397.5 ACSR 26/7 at Howard

18 to 24 Months
$130,000

AH1-690

AEPn9674.0 / AEPO0026b

Replace 1200 A Switch at Fremont

18 to 24 Months
$260,000

AG2-515, AH1-690, AH1-711

AEPn9675.0 / AEPO0035a

Sag Study will be required on ACSR ~ 954 ~ 45/7, 18.3 miles line between South Berwick and Galion .

24 to 36 Months
$229,320

AG2-149, AG2-329, AH1-690, AH1-711

AEPn9676.0 / AEPO0033a

Sag Study will be required on 19.2 miles line between Fostoria and Lallen [...] tudy : S/N: 1409MVA S/E: 1887MVA.Rebuild/Reconductor, cost : $ 38.4 million

24 to 36 Months
$99,840

AH1-690

AEPs2021.3

Rebuild the ~38.5 mile Jay – Allen 138 kV line from Pennville to the juncture west of Allen station

Dec 20 2023
Contingent

AG2-550, AG2-551, AG2-637, AH1-308, AH1-337

AEPs2213.9 / (Pending)

Six-wire 71.5 miles of the Pierce-Don Marquis line. Construct 0.13 miles of line to tie into Don Marquis station.

Jun 01 2027
Contingent

AG2-072, AG2-163, AG2-164, AG2-219, AG2-363, AH1-537

AEPs2887.1 / s2887

Construct a new brownfield, breaker and a half Glen Lyn station next to the existing station

Jun 01 2026
Contingent

AH1-144, AH1-145

AEPs2887.4

Extend the Glen Lyn – Morgans Cut and Glen Lyn – Hazel Hollow lines

Apr 03 2029
Contingent

AH1-144, AH1-145

AEPs3148.1

05WHIPPLEDTC 345.0 kV to 05DESOTO 345.0 kV ckt 1 - s3148.1

Jun 10 2027
Contingent

AG2-029

AEPs3148.1 / s3148

Reinforcement for AF1-118 TP 345 KV to 05SORENS 345 KV ckt 2

Jun 10 2027
Contingent

AG2-519, AG2-550, AG2-637

APS(Pending) / TC1-APS-002.c

Replace/Upgrade (3) 138 kV T-Line Drops at Armstrong

13 Months
$591,863

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AH1-313

APS(Pending) / TC1-APS-002.d

Rebuild 11.6 miles of 556.5 ACSR of the Armstrong - Kittanning 138 kV line

28 Months
$37,921,495

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AH1-313

APS(Pending) / TC1-PH1-004

Rebuild ~21.7 miles on Back Fork-Crupperneck 138 kV Line

38 Months
$68,463,650

AG2-658, AH1-426, AH1-426A

AG2-657

APS(Pending) / TC1-PH1-005

Bays - Wolf Run 138 kV line to be reconductored with 795 ACSR.

19 Months
$17,295,451

AG2-658, AH1-426, AH1-426A

AG2-657

APS(Pending) / TC1-PH1-010

Reconductor Wolf Run - Sutton Tap 138 kV line

19 Months
$15,074,673

AG2-658, AH1-426, AH1-426A

AG2-657

APS(Pending) / TC1-PH1-011

Reconductor Sutton Hill - Sutton Tap 138 kV,

18 Months
$8,545,167

AG2-658, AH1-426, AH1-426A

APS(Pending) / TC1-PH1-014

Replace WT at Shingletown substation.

17 Months
$308,526

AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC1-PH1-066

Reconductor (Possible Rebuild) ~4.8 miles of Blairsville - Social Hall 138 kV line including (2) T-line drops at Social Hall.

20 Months
$18,224,602

AG2-411, AG2-456, AG2-457, AH1-102, AH1-203, AH1-268, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

AH1-201, AH1-205

APS(Pending) / TC1-PH1-076

Reconductor Butler - Karns City 138 kV line.

30 Months
$51,840,579

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AG2-206, AG2-220, AG2-327, AG2-420, AH1-005

APS(Pending) / TC1-PH1-099

Reconductor Sutton Hill - Heater 138 kV Line, Terminal upgrades at Sutton Hill

26 Months
$26,282,083

AG2-658, AH1-426, AH1-426A

APS(Pending) / TC2-APS-001.a

Upgrade 138 kV Carlos DS A-18

21 Months
$432,791

AG2-615

AG2-448, AH1-203, AH1-340

APS(Pending) / TC2-APS-001.b

Upgrade Carlos 138 kV SCCIRs 556.5 ACSR 26/7 bus including risers

15 Months
$426,600

AG2-615

AH1-203

APS(Pending) / TC2-APS-002.a

Upgrade Disc Switch at Beryl

21 Months
$432,791

AG2-505, AG2-582, AG2-615

AG2-062, AH1-340

APS(Pending) / TC2-APS-002.b

Reconductor (Possible Rebuild) ~3.8 miles of AG2-505 - Beryl 138kV transmission line

19 Months
$16,807,147

AG2-505, AG2-582

AH1-340

APS(Pending) / TC2-APS-003

Reconductor (Possible Rebuild) ~1.9 miles of AG2-423 tap - Harmony Jct 138 kV transmission line

18 Months
$6,784,869

AG2-423, AG2-615

APS(Pending) / TC2-APS-004

Reconductor (Possible Rebuild) ~2.2 miles of AF2-356 - Mt Zion 138 kV transmission line

37 Months
$8,699,919

AH1-340

APS(Pending) / TC2-APS-005

Upgrade Wave Trap at Gilboa

19 Months
$364,562

AG2-657, AH1-426, AH1-426A

APS(Pending) / TC2-APS-006

Reconductor (Possible Rebuild) ~2.7 miles of Mechanicstown - Millville 138 kV line

18 Months
$9,809,215

AG2-288

APS(Pending) / TC2-APS-008.a

Replace substation conductor at Hampshire

12 Months
$189,159

AG2-615

APS(Pending) / TC2-APS-008.b

Reconductor Hampshire - Ridgeley 138 kV Line including a line drop at Hampshire and Line drops at Ridgeley

47 Months
$92,496,484

AG2-615

APS(Pending) / TC2-APS-009.a

Reconductor Pruntytown - Shinns Run 138kV line including line drops at Shinns Run

26 Months
$36,786,038

AG2-582

APS(Pending) / TC2-APS-009.b

Upgrade Meters at Pruntytown

13 Months
$1,098,322

AG2-582

APS(Pending) / TC2-APS-010

Reconductor French Creek - Heaters 138kV transmission line

47 Months
$94,637,673

AG2-658, AH1-426, AH1-426A

APS(Pending) / TC2-APS-011.a

Reconductor Glen Falls - Mcalpin transmission line.

19 Months
$16,988,135

AG2-582

APS(Pending) / TC2-APS-011.b

Replace Breaker Failure Relaying at Mcalpin

18 Months
$509,895

AG2-582

APS(Pending) / TC2-APS-012.a

Reconductor 556.5 ACSR 26/7-line exit at Bridgeport Hill

14 Months
$977,534

AG2-582

APS(Pending) / TC2-APS-012.b

Reconductor Bridgeport Hill - Glen Falls transmission line

19 Months
$16,031,404

AG2-582

APS(Pending) / TC2-APS-012.c

Upgrade/Replace (3) 10 Amp Bitronics Meters at Glen Falls

12 Months
$157,861

AG2-582

APS(Pending) / TC2-APS-012.d

Replace SEL-321 impedance relay and 1200 CT at Glen Falls

17 Months
$396,495

AG2-582

APS(Pending) / TC2-APS-013

Upgrade 138 kV Bus Risers at Garrett

12 Months
$263,169

AG2-411, AH1-201, AH1-203, AH1-205, AH1-460, AH1-588, AH1-589

APS(Pending) / TC2-APS-015.a

Replace 500/138 kV TR2 at Flint Run

66 Months
$28,558,871

AG2-582

APS(Pending) / TC2-APS-015.b

Replace 6 138 kV Disc Switches and 5 Breaker Leads at Flint Run

24 Months
$1,826,164

AG2-582

APS(Pending) / TC2-APS-016.a

Replace 500/138 kV TR1 at Flint Run

66 Months
$28,558,871

AG2-582

APS(Pending) / TC2-APS-016.b

Replace 6 138 kV Disc Switches and 5 Breaker Leads at Flint Run

24 Months
$1,826,164

AG2-582

APS(Pending) / TC2-APS-016.c

Replace SCCIR 3" Pipe A-frame closest to Disc SW A-39

18 Months
$597,737

AG2-582

APS(Pending) / TC2-APS-017

Reconductor (Possible Rebuild) ~5.9 miles of Elko - Carbon Center Jct 138 kV transmission line including (2) T-Line Drops at Elko

21 Months
$20,614,554

AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC2-APS-018

Reconductor (Possible Rebuild) ~1.18 miles of Loyalhanna - Edgewater transmission line including (3) T-line Drops at Loyalhanna

19 Months
$5,581,666

AH1-102, AH1-140, AH1-268, AH1-588, AH1-589

AG2-411, AH1-201, AH1-203, AH1-205, AH1-460

APS(Pending) / TC2-APS-019.a

Reconductor (Possible Rebuild) 8.6 miles of Black Oak - Cross School transmission line

41 Months
$31,323,166

AG2-448, AG2-505, AG2-615

AG2-062

APS(Pending) / TC2-APS-019.b

Upgrade/Update (3) 8 amp KC-4 (50FD) Relay at Black Oak

19 Months
$882,439

AG2-448, AG2-505

APS(Pending) / TC2-APS-020.a

Replace Bus Risers at Shingletown substation

13 Months
$591,863

AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC2-APS-020.b

Reconductor (Possible Rebuild) ~19.4 miles of Shawville-Shingletown 230kV transmission line. [WPP side]

69 Months
$100,349,391

AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC2-APS-021

Replace 138 kV Disc Switch at Carlos Jct T

19 Months
$432,790

AG2-615, AH1-203

AG2-411, AG2-448, AH1-201, AH1-205, AH1-340, AH1-460

APS(Pending) / TC2-APS-023.b

Reconductor (Possible Rebuild) ~1 mile of Beryl - Cross School 138 kV transmission line.

18 Months
$4,427,958

AG2-448, AG2-505, AG2-582

AH1-340

APS(Pending) / TC2-APS-026.a

Replace (4) 10 Amp Meters & (3) 10 Amp Relays at Kittanning

20 Months
$1,254,982

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AH1-313

APS(Pending) / TC2-APS-026.b

Replace WHSE 1200 Amp Wave Trap at Armstrong

18 Months
$364,562

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AH1-313

APS(Pending) / TC2-APS-027

Upgrade/Replace 138 kV West Bus + Risers at Powell Mt.

12 Months
$645,868

AG2-657, AH1-426, AH1-426A

APS(Pending) / TC2-APS-028

Reconductor Mt Zion - AG2-505 138kV transmission line

18 Months
$12,297,524

AG2-582, AG2-615

AG2-062, AH1-340

APS(Pending) / TC2-APS-029

Reconductor (Possible Rebuild) ~3.4 mile of Barnetts Run - Bridgeport Hill 138 kV transmission line. Including Wave trap drop and transmission line drop at Barnetts Run

20 Months
$13,223,334

AG2-582

APS(Pending) / TC2-APS-031.a

Upgrade (2) 138 kV Breaker Leads at Karns City

13 Months
$183,598

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC2-APS-031.b

Replace 138 kV T-line drops at Karns City

13 Months
$579,701

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC2-APS-032.a

Upgrade/Replace Wave Trap at Pickens

17 Months
$364,562

AG2-658, AH1-426, AH1-426A

AG2-657

APS(Pending) / TC2-APS-032.b

Reconductor (possible rebuild) ~16.5miles Back Fork - Pickens 138 kV

38 Months
$55,447,998

AG2-658, AH1-426, AH1-426A

AG2-657

APS(Pending) / TC2-APS-032.c

Upgrade/Replace shared node at Back Fork

12 Months
$263,169

AG2-658, AH1-426, AH1-426A

AG2-657

APS(Pending) / TC2-APS-033

Reconductor Cherry Run - Morgan 138 kV transmission line

47 Months
$92,496,484

AG2-615

APS(Pending) / TC2-APS-034.a

Replace Bus Riser and Bus Side Disc Leads at Shingletown

13 Months
$427,516

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-APS-034.b

Replace Bus Riser at Shingletown

12 Months
$263,169

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-APS-034.c

Reconductor Shingletown - Lewistown 230kV line including T-line drop at Shingletown

55 Months
$73,419,183

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-APS-034.d

Replace Disc Switches at Shingletown

22 Months
$711,556

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-APS-034.e

Replace Current Transformers at Shingletown

22 Months
$1,563,362

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-APS-034.f

Replace Breaker Leads at Shingletown

12 Months
$214,619

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-APS-034.g

Replace/Update SEL-421 Relay at Shingletown

18 Months
$509,895

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-APS-034.h

Replace/Update SEL-421 Relay at Shingletown

18 Months
$509,895

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-APS-034.i

Replace Circuit Breaker at Shingletown

45 Months
$1,621,562

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-APS-036.a

Upgrade/Replace (6) 138kV Substation Conductors [(2) ACSR 954 45/7 & (4) AAC 1000 37]

15 Months
$1,084,903

AG2-176, AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC2-APS-036.b

Upgrade 345/138 kV #2 Transformer at Armstrong

65 Months
$13,326,308

AG2-176, AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC2-APS-036.c

Update/Replace 138 kV SEL-311B Relay

18 Months
$509,895

AG2-176, AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC2-APS-036.d

Upgrade/Replace (4) 138 kV SPS AL 3.00 PIPE Substation Conductors

14 Months
$193,266

AG2-176, AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APS(Pending) / TC2-PH1-019.c

Upgrade SEL-321 (21/67NP-BLACK OAK) relay at Cross School

18 Months
$509,895

AG2-448, AG2-505

APS(Pending) / TC2-PH1-019.d

Upgrade/Update 2 relays at Black Oak (KD-11 Zone 3 & KD-10 Zone 2)

18 Months
$509,895

AG2-448, AG2-505

APS(Pending) / TC2-PH1-023.a

Upgrade 138 kV Disc Sw 1306_Q at Beryl

19 Months
$432,790

AG2-448, AG2-505, AG2-582, AG2-615

AG2-062, AH1-340

APS(Pending) / TC2-PH1-025

Reconductor (Possible Rebuild) ~2 miles of Barnetts Run-Shinns Run 138kV line including T-line drops at Barnetts Run & Shinns Run

18 Months
$8,443,469

AG2-582

APS(Pending) / TC2-PN-002.a

Reconductor Shingletown - Lewistown 230kV line [PN Side]

49 Months
$58,911,069

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / TC2-PN-002.b

Replace/Update SEL-421 Relays at Lewistown

12 Months
$176,953

AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

APS(Pending) / WP-AF1-F-0001

Replace Wave Trap at Keystone

19 Months
$364,562

AG2-347, AH1-634, AH1-695, AH1-710, AH1-734

APS(Pending) / WP-AF2-F-0010

Reconductor 5.1 miles of Edgewater Tap - Vasco Tap 138 kV line

21 Months
$19,555,226

AH1-102, AH1-140, AH1-268, AH1-588, AH1-589

AH1-201, AH1-203, AH1-205, AH1-460

APSb4000.10

Install four 250 MVAR cap banks (two on 765 and two on 500 kV side) and a +/-500 MVAR STATCOM on the 765 kV Rocky Point yard

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

APSb4000.11

Expand Black Oak Substation & Loop in the 502 Jct-Woodside 500 kV line (Projected ISD 6/1/2029)

Jun 01 2029
Contingent

AG2-062, AG2-072, AG2-347, AG2-360, AG2-448, AG2-582, AG2-615, AH1-695, AH1-721

APSb4000.2

Construct a new 175 miles Amos to Welton Spring 765 kV line - AEP Section of the line is 30 miles (Projected ISD 6/1/2029)

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

APSb4000.3

Construct a new 175 miles Amos to Welton Spring 765 kV line - APS/FE Section of the line is 145 miles (Projected ISD 6/1/2029)

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

APSb4000.4

Construct a new 765 kV switchyard - Welton Spring (Projected ISD 6/1/2029)

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

APSb4000.5

Install four 250 MVAR shunt capacitors, and a +/-500 MVAR STATCOM at Welton Spring 765 kV substation

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

APSb4000.6

Construct a new 86 miles Welton Spring to Rocky Point 765 kV line (Welton Spring to DVP local area, roughly 21 miles) (VA Portion)

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

APSb4000.7

Construct a new 86 miles Welton Spring to Rocky Point 765 kV line - in DVP local area/Millville to Lovettsville section, roughly 10.5 miles (Projected ISD 6/1/2029)

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

APSb4000.8

Construct a new 86 miles Welton Spring to Rocky Point 765 kV line (DVP local area to Rocky Point, roughly 4.8 miles)

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

APSb4000.9

Construct a new substation called Rocky Point with a 765 kV and a 500 kV yard (Projected ISD 6/1/2029)

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721

APSn6183

Rebuild 10.4 miles of 4/0 CU from Columbia Big Pine - Garretts Run Jct 138 kV (99 spans).

26 Months
$36,946,687

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AH1-005, AH1-313

APSn7164.1

Reconductor (Possible Rebuild) ~7.5 miles of the Karns City to Kissinger Jct 138kV line

23 Months
$26,275,973

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APSn7165.1

Replace T-line drops at All Dam 6

12 Months
$427,516

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APSn7165.2

Reconductor All Dam 6 - Kittanning 138kV line

22 Months
$21,034,523

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APSn7166.1

Replace 4/0 CU line exit at All Dam 6 Tap.

18 Months
$922,908

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APSn7166.2

Reconductor 7.6 miles of 4/0 CU from All Dam 6 Tap to structure 84 (66 spans)

23 Months
$26,284,067

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

APSn7171.1

Rebuild approximately 4.0 miles of 4/0 CU on the Kiski Valley to Columbia Big Pine 138kV line.

20 Months
$15,258,720

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AH1-005, AH1-313

APSn7191.1

Reconductor the Garrett - Garrett Tap 115 kV Line (~2.0 miles)

37 Months
$7,972,991

AG2-411, AH1-201, AH1-203, AH1-205, AH1-460, AH1-588, AH1-589

APSn7518

Reconductor (Possible Rebuild) ~4.6 miles of Crupperneck-Grassy Falls 138kV line including T-Line drops at Crupperneck

19 Months
$17,251,304

AH1-426, AH1-426A

AG2-657

APSn9160.0 / TC1-PH1-077

Reconductor Powell Mountain - Bays 138 kV Line

31 Months
$38,094,411

AG2-658, AH1-426, AH1-426A

AG2-657

APSn9240.0 / TC1-APS-002.a

Replace GE 800 Amp Wave Trap at Kittanning

17 Months
$364,562

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AG2-206, AG2-220, AG2-327, AH1-005, AH1-313

APSn9241.0 / TC1-APS-002.b

Replace 8 Amp ITH(50FD) relay at Kittanning

18 Months
$509,895

AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AG2-206, AG2-220, AG2-327, AH1-005, AH1-313

APSs3191.1 / APS-2023-056

Harrison – Pruntytown 500 kV Misoperation Relays (Projected ISD by end of 2025)

Dec 31 2024
Contingent

AG2-582

APSs3475.1 / APS-2024-024

At Ridgeley, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying (Projected ISD 10/31/2027)

Oct 31 2027
Contingent

AG2-615

APSs3483.1 / APS-2023-021

Convert Milesburg Substation into a four-breaker 230 kV ring bus (Projected ISD 12/17/2027)

Dec 17 2027
Contingent

AG2-456, AG2-457, AH1-313, AH1-587, AH1-588, AH1-589

APSs3493.1 / APS-2024-051

Terminal Equipment Upgrades at Crupperneck, Cowen, and Back Fork 138kV substations (Projected ISD 6/30/2027)

Jul 30 2027
Contingent

AG2-657, AG2-658, AH1-426, AH1-426A

APSs3712.1 / APS-2024-047

Terminal Equipment Upgrades at Morgan & Cherry Run - Misoperation Relay Project (Projected ISD 7/21/2029)

Jul 21 2029
Contingent

AG2-448, AG2-615

APSs3713.1 / APS-2025-018

Terminal Equipment Upgrades at Black Oak & Cross School - Misoperation Relay Project (Supplemental - Projected ISD 12/31/2026)

Dec 31 2026
Contingent

AG2-062, AG2-448, AG2-505, AG2-615, AH1-340

ATSI(Pending) / TC2-ATSI-001

Reconductor (possible rebuild) 1.98 miles of 795 ACSR 36/1 transmission line and 795 ACSR 36/1 line drops on the Avon-Astor T11 Ckt Q11 138 kV line

18 Months
$7,382,665

AH1-690

ATSI(Pending) / TC2-ATSI-002.a

Upgrade (4) 1024.5 ACAR 24/13 sub conductors at Davis Besse

14 Months
$1,099,401

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.b

Upgrade (3) 345kV bus and line side disconnect switches at Davis Besse substation at Davis Besse

37 Months
$1,324,127

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.c

Upgrade 345kV 1033.5 AAC 61 sub conductors at Davis Besse substation at Davis Besse

13 Months
$257,762

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.d

Reconductor (possible rebuild) 345kV 20.75 miles of transmission line and line drops at both remote ends

71 Months
$121,594,776

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.e

Upgrade 345kV 3500 SAC 127 sub conductor at Davis Besse

13 Months
$257,762

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.f

Upgrade (2) 345kV Wave Traps at Bayshore and (2) at Davis Besse

22 Months
$1,215,694

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.g

Upgrade (2) 345kV circuit breakers at Bayshore and (2) at Davis Besse

60 Months
$7,786,806

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.h

Upgrade (8) 1590 AAC 61 sub conductor at BAYSHORE

13 Months
$211,119

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.i

Upgrade B34544 CT at BAYSHORE

20 Months
$712,356

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.j

Upgrade (1) 1590 ACSR 45/7 sub conductor at Davis Besse

13 Months
$393,871

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.k

Upgrade the B34545 and 34562 (4) Meter and (2) Relay Thermals at Bayshore and Davis Besse

19 Months
$998,835

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.l

Upgrade (5) 4.00 SPS AL PIPE 61 sub conductors at BAYSHORE on the Bayshore - Davis Besse 345kV line

14 Months
$246,545

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-002.m

Upgrade (7) 3000A disconnect switches (D34545:N,S, D3454:W,E, A34673, D34561C, and 34623)and (2) B34545 impedance relays at Bayshore and Davis Besse

42 Months
$3,544,138

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-003

Reconductor (possible rebuild) 12.19 miles of transmission line on the Beaver- Johnson Ckt 1 138kV

27 Months
$42,140,488

AH1-690

ATSI(Pending) / TC2-ATSI-004.a

Upgrade D120 and D125 disconnect switches at Beaver substation

22 Months
$929,516

AG2-149, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-004.b

Upgrade (1) 3000 SAC 169 line drop at Beaver

12 Months
$263,169

AG2-149, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-004.c

Reconductor (possible rebuild) 18.22 miles of 954 ACSR 48/7 transmission line and (3) line drops at Beaver on the Beaver - Carlisle Ckt 1 345 kV

63 Months
$109,211,408

AG2-149, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-004.d

Upgrade (1) 3500 SAC 127 D120-to-B121 breaker lead at Beaver

12 Months
$265,209

AG2-149, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-005.a

Upgrade (3) disconnect switches at Beaver (D:120,166,165)

37 Months
$1,350,788

AG2-149, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-005.b

Upgrade (4) 954 ACSR 45/7 overhead line and line drops at Beaver Substation

15 Months
$809,465

AG2-149, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-005.d

Reconductor (possible rebuild) 8.37 miles of 954 ACSR 48/7 transmission line on the Beaver - Lake Avenue Ckt 1 345 kV

38 Months
$50,053,445

AG2-149, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-005c

Upgrade 3500 SAC 127 B161 (2) breaker leads and (1) B121-to-D120 breaker lead at Beaver

11 Months
$191,109

AG2-149, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.a

Reconductor (possible rebuild) 30.25 miles of 954 ACSR 48/7 transmission line and line drops (line drops at Davis Besse) on the Davis Besse-Hayes 345 kV line

90 Months
$179,916,169

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.b

Upgrade 3500 SAC 127 OVERHEAD PIPE to disc sw. 34625 at Davis Besse and B18 breaker leads at Hayes

18 Months
$284,061

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.c

Upgrade (2) Wave Traps at Davis Besse and (2) Wave Traps at Hayes

20 Months
$1,215,695

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.d

Upgrade (2) B18 & B12 345 kV Ciruit Breakers at Hayes

56 Months
$3,893,404

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.e

Upgrade (2) B12 and B18 CTs at Hayes

21 Months
$1,258,596

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.f

Upgrade (10) 1590 ACSR sub conductor (B66 and B67 breaker leads, wave trap subconductor, Overheadline-34625) at Davis Besse and B12 breaker leads at Hayes

18 Months
$305,149

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.g

Upgrade B66 and B67 circuit breakers at Davis Besse substation

56 Months
$3,893,404

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.h

Upgrade B66 (1) meter and (1) relay thermals and B67 (1) meter thermal at Davis Besse substation

19 Months
$852,462

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.i

Upgrade (2) 9.6 Ohms impedance relays at Hayes and (2) 12.9 Ohms impedance relays at Davis Besse

19 Months
$1,019,790

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.j

Upgrade (6) disconnect switches at Davis Besse (D27,28,29,30,34625,37) and (5) disconnect switches at Hayes (D20,19,16,13,14)

31 Months
$4,525,814

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-006.k

Upgrade (1) 1590 AACSR Phase A/C line drop at Davis Besse substation and (3) Phase 3 "B-B", Phase 1&2 "C-C", and shared node to wave trap line drops at Hayes

18 Months
$855,032

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.a

Upgrade D41 and D42 disconnect switches at Davis Besse

36 Months
$967,716

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.b

Upgrade (1) 1024 ACAR 6E550-52-1 "A" line drop at Davis Besse

12 Months
$263,169

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.c

Reconductor (possible rebuild) 15.6 miles of 954 ACSR 45/7 on the Davis Besse - AC2-103 Tap 345 kV line

57 Months
$91,775,258

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.d

Upgrade (2) 3500 SAC 127 line drops at Davis Besse

12 Months
$263,169

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.e

Upgrade 3500 SAC B65 breaker leads and subconductor (D42 to wave trap) at Davis Besse

13 Months
$197,592

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.f

Reconductor (possible rebuild) 18.7 miles of 954 ACSR 48/7 on the Davis Besse - AC2-103 TAP 345kV

64 Months
$111,822,087

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.g

Upgrade (2) Wave Traps at Davis Besse

20 Months
$620,599

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.h

Upgrade Circuit Breaker 34564 at Davis Besse

54 Months
$2,068,856

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.i

Upgrade (4) 1590 ACSR 45/7 sub conductors at Davis Besse

13 Months
$756,208

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.j

Upgrade (2) 13.03 Ohm B65 Impedance Relays at Davis Besse

18 Months
$509,895

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.k

Upgrade (2) 6.65 Ohm B65 Impedance Relays at Davis Besse

18 Months
$509,895

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.l

Upgrade Circuit Breaker B65 at Davis Besse

54 Months
$2,068,856

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-008.m

Upgrade (2) B65 Meter Thermals at Davis Besse

18 Months
$509,895

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-010

Upgrade 4/0 CU sub conductor at FOWLES substation

13 Months
$591,862

AH1-690

ATSI(Pending) / TC2-ATSI-014.a

Reconductor (possible rebuild) 29.61 miles of transmission line and line drops ( line drops at Hayes) on the Beaver - Hayes Ckt 1 345 kV line

90 Months
$175,902,477

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.b

Upgrade 3500 SAC (2) B3 and (2) B6 breaker leads at Hayes

18 Months
$152,573

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.c

Upgrade (2) L3000 wavetraps at Beaver and Hayes

18 Months
$729,124

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.d

Upgrade (4) circuit breakers at Beaver and Hayes (B88, B115, B3, B6)

60 Months
$7,937,520

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.e

Upgrade the 1590 AAC (2) B88 and (2) B15 breaker leads at Beaver

18 Months
$152,573

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.f

Upgrade the B6 CT at Hayes

20 Months
$727,300

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.g

Upgrade (3) 1590 AAC line drops at Beaver (line drop to WT, Phase 1&3 "B-B", and SHARED NODE TO: WT, PH 2 / 5" AL, PH 1&3)

18 Months
$591,863

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.h

Upgrade the B88 and B115 CTs at Beaver

21 Months
$1,258,596

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.i

Upgrade the 10A B115 relay and B88 meter thermal at Beaver

18 Months
$509,895

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.j

Upgrade the B88 and B3 impedance relays at Beaver and Hayes

19 Months
$1,019,790

AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-014.k

Upgrade (9) 3000A disconnect switches at Beaver and Hayes (D:74,92,93,116,4,5,7,8,11)

29 Months
$3,774,791

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-015.a

Reconductor (possible rebuild) 21.68 miles of transmission line and (1) line drop (line drop at Lemoyne) on the Davis Besse - Lemoyne 345 kV

73 Months
$126,131,949

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-015.b

Upgrade (4) L300 wavetraps at Davis Besse and Lemoyne

22 Months
$1,132,675

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-015.c

Upgrade (2) 3000A CBs at Davis Besse and (1) 3000A CB at Lemoyne

56 Months
$5,962,261

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-015.d

Upgrade (12) dual 1590 ACSR SCCIR at Davis Besse and Lemoyne

12 Months
$2,070,983

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-015.e

Upgrade (2) 8.6 Ohm impedance relays at Davis Besse and (2) 7.8 Ohm impedance relays at Lemoyne

18 Months
$1,019,790

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-015.f

Upgrade the B34502 CB at Lemoyne

54 Months
$2,068,856

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-015.g

Upgrade (2) B34501 and B34502 relay thermals at Lemoyne and (3) 34563 relay and meter thermals at Davis Besse

20 Months
$2,137,421

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-015.h

Upgrade (12) 4.00 SPS.AL PIPE at Lemoyne

22 Months
$961,300

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-015.i

Upgrade (10) 3000A bus and line side disconnect switches at Davis Besse and Lemoyne (34624, A34604, D345:63A,63B,64D,64C,01N,01S,02W,02E)

29 Months
$3,952,709

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-016.a

Upgrade (1) line drop into Lakeview and (1) line drop into Ottawa

13 Months
$526,339

AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-016.b

Upgrade the standalone CT at Ottawa

20 Months
$672,402

AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-016.c

Reconductor (possible rebuild) 10.46 miles of transmission line on the Ottawa-Lakeview 138 kV Q-121 line

25 Months
$38,463,247

AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-016.d

Upgrade 795 ACSR B6 and B145 breaker leads and shared and (2) shared node subconductors at Lakeview

13 Months
$337,294

AG2-515, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-017

Upgrade (2) 2000A bus and line side disconnect switches at Bayshore

36 Months
$948,616

AH1-690

ATSI(Pending) / TC2-ATSI-019

Upgrade phase 2 wave trap at Galion

18 Months
$620,599

AG2-149, AG2-329, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.a

Upgrade B185 and B182 circuit breakers at Beaver

56 Months
$3,893,404

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.b

Upgrade (4) disconnect switches at Beaver (D186,184,181,183)

25 Months
$1,699,640

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.c

Upgrade 3000 AAC B185 and B185 breaker leads at Beaver

13 Months
$187,449

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.d

Reconductor (possible rebuild) 29.61 miles of transmission line and (4) line drops beginning at Beaver towards Davis Besse on the Beaver - Davis Besse Ckt 1 345 kV line

82 Months
$149,403,319

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.e

Upgrade (2) L3000 wavetraps at Beaver

18 Months
$620,600

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.f

Upgrade (2) B182 impedance relays at Beaver (SEL-321: Z2-BU & Z2-PR)

19 Months
$509,895

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.g

Upgrade (2) B185 and B182 revenue meter CTs at Beaver

21 Months
$1,258,596

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.h

Upgrade the B185 CT to PVD at Beaver

17 Months
$349,952

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.i

Upgrade B182 relay thermal at Beaver

19 Months
$509,895

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-020.j

Upgrade (2) B182 impedance relays at Beaver (SEL-321: Z4-BU & Z4-PR)

19 Months
$509,895

AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.a

Upgrade (4) circuit breakers at Beaver and Lake Ave (B:3,4,216,219)

56 Months
$7,786,809

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.b

Upgrade 1590 AAC B3, B4, B216 and B219 breaker leads at Beaver and Lake Ave

12 Months
$305,540

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.c

Upgrade the (3) B216, B219 and B4 1500 CTs

16 Months
$853,850

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.d

Upgrade (3) 1590 line drops at Beaver and Lake Ave

12 Months
$690,685

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.e

Upgrade the (1) B219 1200 CT to PVD at Beaver

16 Months
$349,952

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.f

Upgrade the (1) B216 relay thermal at Beaver

18 Months
$509,895

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.g

Upgrade (1) 4.00 SPS.AL PIPE at Beaver

12 Months
$178,089

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.h

Upgrade (9) disconnect switches at Beaver and Lake Ave (D: 19,20,21,22, 212,215,217,218,220)

39 Months
$3,850,794

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.i

Upgrade the (2) B3 SEL411L impedance relays at Lake Ave

18 Months
$509,895

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.j

Upgrade (2) 2.50 SPS.AL PIPE SCCIR at Beaver

12 Months
$173,391

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.k

Upgrade the (15) B216, B219, B3 and B4 2000 CTs at Beaver and Lake Ave

17 Months
$2,701,212

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.l

Upgrade the (2) B216 SEL411L impedance relays at Lake Ave

18 Months
$509,895

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-021.m

Upgrade (8) 5.00 SPS.AL PIPE SCCIR at Beaver

12 Months
$250,039

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSI(Pending) / TC2-ATSI-023.a

Upgrade (2) line drop strands, one into Greenfield and one into Lakeview

12 Months
$526,339

AG2-515, AH1-690, AH1-711

AG2-660, AH1-044, AH1-150, AH1-151

ATSI(Pending) / TC2-ATSI.023.b

Upgrade the B242 relay thermal

18 Months
$509,895

AG2-515, AH1-690, AH1-711

AG2-660, AH1-044, AH1-150, AH1-151

ATSI(Pending) / TC2-ATSI.023.c

Upgrade the (2) B96 and (2) B7 breaker leads at Lakeview and the (1) B242 to D241 lead at Greenfield

13 Months
$218,931

AG2-515, AH1-690, AH1-711

AG2-660, AH1-044, AH1-150, AH1-151

ATSIb3033

Ottawa-Lakeview 138 kV Reconductor and Substation Upgrades

Oct 31 2025
Contingent

AG2-515, AH1-690, AH1-711

ATSIb3925.1

Rebuild the 7.46 miles of Avery - Shinrock 138 kV Line with 795 kcmil 26/7 ACSS (7.46 miles)

Dec 10 2027
Contingent

AH1-690

ATSIb3925.2

Rebuild the 13.45 miles of Greenfield - Lakeview 138 kV Line from 2 x 336.4 kcmil 26/7 ACSR to 1 x 795 kcmil 26/7 ACSS

Jun 01 2029
Contingent

AG2-289, AG2-290, AG2-515, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711

ATSIb3925.3

Rebuild the 6.5 miles of Avery-Hayes 138 kV Line with 795 kcmil 26/7 ACSS conductor

Jun 01 2027
Contingent

AH1-690

ATSIb3925.4

Rebuild the Greenfield - Beaver 138 kV corridor (32 miles) with 795 kcmil 26/7 ACSS

Jun 01 2029
Contingent

AH1-690, AH1-711

ATSIn6511

Reconductor the 0.8 miles of transmission line between West Fremont-Fremont [...] section of limiting conductor and provide estimates for their replacement.

17 Months
$4,238,484

AG2-515, AH1-690, AH1-711

ATSIn9227.0 / TC1-ATSI-001.b

Upgrade T-line drops, overhead substation conductor and TL reconductor

37 Months
$48,873,856

AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711

ATSIn9228.0 / TC1-ATSI-002.b

Rebuild 6.6 miles of the Lallendorf-Monroe 345 kV line and install OPGW. Replace line drops and wave traps at Lallendorf.

29 Months
$38,362,639

AH1-272

ATSIn9322.0 / TE-AG1-S-0012a

Replace Four (4) disconnect switches, four (4) breaker leads, and one (1) meter, and reconductor two (2) transmission line drops on the Morocco 345 kV line terminal at Allen Junction.

38 Months
$1,408,997

AH1-272

ATSIs3360.1

Galion 138kV Upgrades

Jun 01 2027
Contingent

AG2-149, AG2-329, AH1-282, AH1-690

ATSIs3469.1 / ATSI-2024-024

Rebuild the double circuit Galion – Roberts North 138 kV Line and Galion – Roberts South 138 kV Line

Aug 27 2026
Contingent

AG2-119, AG2-149, AG2-329, AH1-282, AH1-690

BGEb3780.13

Batavia Road to Riverside 230 kV reconductor

Dec 31 2027
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3780.4

Peach Bottom to Graceton (BGE Portion) – New 500kV Line

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3780.5

Build Solley Road substation + Statcom (Projected ISD 12/31/2028)

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3780.6

Build Granite substation + Statcom (Projected ISD 12/31/2028)

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3780.7

Build new Batavia Road substation (Projected ISD 12/31/2028)

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3780.8

Graceton 500 kV substation expansion (Projected ISD 12/31/2028)

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3780.9

Graceton to Batavia Road 230 kV double circuit pole line (Projected ISD 12/31/2028)

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.26

Build High Ridge 500 kV substation - Three bay breaker and half configuration (Projected ISD 12/31/2030)

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.27

High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) - Waugh Chapel side (Projected ISD 12/31/2030)

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.28

High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) -Brighton side (Projected ISD 12/31/2030)

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.29

High Ridge termination for the North Delta-High Ridge 500 kV line (Projected ISD 12/31/2030)

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.30

High Ridge - Install two 500/230 kV transformers (Projected ISD 12/31/2030)

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.32

Build new North Delta-High Ridge 500 kV line - BGE Portion (Projected ISD 12/31/2030)

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.33

Replace terminal equipment limitations at Brighton 500 kV - on the existing Brighton-Waugh Chapel 500 kV (5053) or new Brighton-High Ridge 500 kV.

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.34

Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV and cut into North Delta 500kV (Projected ISD 12/31/2030)

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.36

Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV (Projected ISD 12/31/2030)

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.37

Replace terminal equipment limitations at Conastone 500 kV - on the (existing Peach Bottom-Conastone) or (new Graceton-Conastone) 500 kV line (Projected ISD 12/31/2030)

Dec 31 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

BGEb3800.41

Conastone-Brighton 500 kV (5011 circuit) - Replace terminal equipment limitations at Conastone 500 kV.

Dec 31 2030
Contingent

AG2-347, AH1-695, AH1-710, AH1-725

ComEd(Pending) / CE_NUN_COLLINS_TR

Collins Station 23 New Transformer

24 to 30 Months
$15,600,000

AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-543

ComEd(Pending) / CE_NUN_L0627.3

TC2 Network Upgrade L0627

24 to 30 Months
$30,800,000

AG2-660, AH1-044, AH1-150, AH1-151

ComEd(Pending) / CE_NUN_L11103_1

TC2 NETWORK UPGRADE - 138KV L11103

24 to 30 Months
$2,600,000

AH1-563

ComEd(Pending) / CE_NUN_L11104-1

TC2 NETWORK UPGRADE L11104

12 to 15 Months
$600,000

AG2-575, AH1-285, AH1-338, AH1-341

ComEd(Pending) / CE_NUN_L11301_1

Sandwich - Waterman L11301 138 Kv Line Upgrades

16 to 24 Months
$9,700,000

AG2-575, AG2-660, AH1-044, AH1-150, AH1-151, AH1-338, AH1-341

ComEd(Pending) / CE_NUN_L1205-1

TC2 Network Upgrade- L1205

24 to 30 Months
$2,800,000

AG2-524

ComEd(Pending) / CE_NUN_L14609_1

L14609 Line Reconductor and Station Conductor Upgrade

24 to 30 Months
$2,500,000

AG2-575, AH1-285, AH1-338, AH1-341

AG2-660, AH1-044, AH1-150, AH1-151

ComEd(Pending) / CE_NUN_L17705_1

Reconductor Sheffield - Burnham and upgrade station conductor at Burnham

24 to 30 Months
$14,000,000

AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-714

ComEd(Pending) / CE_NUN_L18623.2

Haumesser - Steward 138 kV Line Reconductor

18 to 24 Months
$8,500,000

AG2-575, AG2-660, AH1-044, AH1-150, AH1-151, AH1-338, AH1-341

ComEd(Pending) / CE_NUN_L8014.3

L8014 Reconductor & terminal work.

30 to 36 Months
$98,000,000

AG2-114, AH1-541, AH1-670

ComEd(Pending) / CE_NUN_L95201_1

194 Sabrooke Station Conductor

12 to 16 Months
$500,000

AH1-564

ComEd(Pending) / CE_NUN_TSS 111

TSS 167 Plano new circuit breaker

12 to 18 Months
$5,000,000

AG2-660, AH1-044, AH1-150, AH1-151

ComEd(Pending) / CE_NUN_TSS155_TR83

TSS155 Nelson New Transformer

24 to 30 Months
$15,200,000

AG2-660, AH1-044, AH1-150, AH1-151

ComEdb3775.1

Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line

Dec 01 2026
Contingent

AG2-029, AG2-072, AG2-400

ComEdb3811.1 / CE_PJM B3811_L11323

Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus.

Dec 01 2028
Contingent

AG2-575, AH1-338, AH1-341

ComEdb3811.2 / CE_PJM B3811_L11323

Additional Circuit Breaker at ESS H452

Dec 01 2028
Contingent

AG2-575, AH1-338, AH1-341

ComEdb3811.3 / CE_PJM B3811_L11323

Rebuild 3 miles of 138 kV line 11323 from Haumesser Road to the H-452 tap

Dec 01 2028
Contingent

AG2-575, AH1-338, AH1-341

ComEdb3915.1

Reconductor 345 kV lines 1202 and 1227 from Dresden to Mulberry

Jun 01 2029
Contingent

AG2-363, AG2-364, AH1-543

ComEdb3915.2

Equipment upgrades at Dresden 345 kV Substation

Jun 01 2029
Contingent

AG2-363, AG2-364, AH1-543

ComEdb3915.3

Equipment upgrades at Mulberry 345 kV Substation

Jun 01 2029
Contingent

AG2-363, AG2-364, AH1-543

ComEdn3515.1 / ce-017

Cherry Valley - Garden Prarie 345 kV: Line rebuild, station bus work, & Cherry Valley 345kV breaker replacement

50 Months
$84,712,245

AG2-516, AH1-146, AH1-147, AH1-341, AH1-564

ComEdn5318.1 / ce-012a

Garden Prarie - Silver Lake R 345 kV: Line rebuild, station bus work & Silver Lake 345kV Breaker Replacement

60 Months
$163,968,683

AG2-516, AH1-146, AH1-147, AH1-196, AH1-341, AH1-564

ComEdn5792 / CE_NUN_L11323

Rebuild Haumesser - West Dekalb 138 kV line (L11323)

30 Months
$10,479,841

AG2-575, AH1-338, AH1-341

ComEdn6260.1 / CE_NUN_8012

Upgrade of TSS 80 Pontiac 345kV circuit breaker BT 4-5 and 345kV station and bus conductor

60 Months
$3,599,608

AG2-114, AH1-541, AH1-670

ComEdn6260.3 / CE_NUN_L8012_1

Station upgrade and line re-conductoring Loretto - Pontiac 345 kV line

30 Months
$21,600,000

AH1-541, AH1-670

ComEdn6280 / ce-005

Mitigate the sag on the ComEd Powerton - Tazewell L0304 345 kV line.

Nov 01 2026
Contingent

AG2-363, AG2-364

ComEdn6779 / CE_NUN_L14609

Plano 138 KV re-conductor a portion of the line

30 Months
$5,600,000

AG2-575, AH1-285, AH1-338, AH1-341

AG2-660, AH1-044, AH1-150, AH1-151

ComEdn7023.1 / CE_NUN_L11124.1

Reconductor the Electric Junction - Lombard line L11124 345 kV Line and perform associated station relay and protection upgrades.

36 Months
$38,797,273

AH1-044, AH1-150, AH1-151

ComEdn7941 / CE_NUN_8001

Pontiac - Z2-087 (McLean) Sag Mitigation

30 Months
$10,500,000

AH1-670

ComEdn7941.1 / CE_NUN_8001_1

Pontiac Line Reconductor and Station Work

31 to 52 Months
$95,900,398

AH1-670

ComEdn8379 / CE_NUN_L11212_NEW TR

Wilton Center - Install 3rd Transformer

48 Months
$38,000,000

AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-714

ComEdn8389 / CE_N8389_116BT3-4_1

TSS 116 Replace Station Conductor

24 Months
$1,000,000

AG2-363, AG2-364, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151

ComEdn9195.0 / CE_NUN_STA12_345 NEW CB

Install a new 345 kV circuit breaker at Station 12 Dresden.

45 Months
$3,357,627

AG2-114, AH1-541, AH1-670

ComEdn9269.0 / CE_NUN_L11212.5

Reconductorthe L11212 345 kV line.

42 Months
$37,989,655

AG2-453, AH1-714

ComEdn9315.0 / N9315.0

Upgrade station conductors and equipment at TSS 80 Pontiac Substation

Dec 31 2027
$914,669

AH1-670

ComEdn9678.0 / CE_NUN_L11215_1

Mitigate the sag on L11215

30 Months
$9,000,000

AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-714

ComEds3011 / CE_S3011

Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration.

Dec 31 2028
Contingent

AG2-363, AG2-364

DEOK(Pending) / F4504

DEOK New Sub and New 345kV Line from Tanner's Creek

72 to 84 Months
$72,000,000

AG2-072, AG2-165, AG2-212, AG2-328

DEOKn9176.0 / M240124

Rebuild the 1.4 mile long feeder from McGuffey to Locust.

36 to 39 Months
$5,315,554

AG2-550, AG2-551, AG2-637

DEOKn9186.0 / M240135

Rebuild ~1.40 mile DEOK portion of Longbranch-Mt. Zion with new structures and 954ACSS/TW, 200C

30 to 36 Months
$4,803,522

AG2-073, AG2-081, AG2-159, AH1-004, AH1-664, AH1-665, AH1-666, AH1-721

AH1-427

DEOKn9187.0 / M220257

Rebuild 11.9 mile DEOK portion of College Corner-Collinsville line with new structures and 954ACSS/TW Cardinal, 200C

48 Months
$58,406,862

AG2-550, AG2-637

AH1-337

DPL(Pending) /

Replace terminal equipment at Cambridge Substation (Jackson to Cambridge 69 kV Line Upgrade) (In Service)

9 to 18 Months
$1,000,000

AG2-181

DPL(Pending) /

Reconductor the transmission line and replacing terminal equipment at Cambridge Substation.

36 to 60 Months
$10,000,000

AG2-181

DPL(Pending) /

Replace terminal equipment at Vienne Substation (Sharptown - Vienna 69 kV Line) (In Service)

9 to 12 Months
$500,000

AG2-181

DPL(Pending) /

Replace terminal equipment at Keeney and Red Lion West Substation (Keeney - Red Lion West 230 kV Line)

36 to 60 Months
$8,500,000

AG2-347, AH1-634, AH1-710

DPL(Pending) / 6704-2 Kent

Upgrade disconnect switch at Kent Substation

24 to 30 Months
$200,000

AG2-281, AH1-536

AG2-380

DPL(Pending) / 6708-2

Rebuild Mardela - Hebron 69kV line

55 to 65 Months
$8,080,000

AG2-181

DPLb2946

PJM baseline upgrade b2946 conversion of Preston station to a Ring Bus

May 31 2026
Contingent

AG2-181, AG2-347, AH1-380, AH1-584, AH1-585, AH1-586, AH1-634

DPLb3143.2

B3143.2: Reconductor the Darley – Naamans Road 69 kV circuit

Dec 30 2026
Contingent

AG2-347

DPLn6925 / dt22085r0001

Rebuild Edge Moor (DPL) - Linwood (PECO) 230 kV line.

36 to 48 Months
$71,680,000

AG2-347

DPLn6926 / dt22084r0001

Rebuild (DPL) Claymont - (PECO) Linwood line and terminal equipment at Claymont.

36 to 48 Months
$7,100,000

AG2-281, AG2-347, AH1-584, AH1-585, AH1-586, AH1-634, AH1-672, AH1-710

DPLn6927 / dt23015r0001

Rebuild Edge Moor to Claymont 230 kV line. Upgrade terminal equipment at Claymont and Edge Moor.

36 to 48 Months
$23,000,000

AG2-347, AH1-584, AH1-585, AH1-586, AH1-634, AH1-672

DPLn7038 / dt13703r0001

Rebuild Indian River to Nelson 138 kV circuit.

Oct 31 2026
$85,560,000

AH1-584, AH1-585, AH1-586

DPLn7039 / ds13703r0001

Replace terminal equipment at Nelson (In Service)

9 to 12 Months
$250,000

AH1-584, AH1-585, AH1-586

DPLn7042 / dt6704r0001

Rebuild Kent to N. Meredith Tap. Upgrade disconnect switch @ N Meredith

Oct 30 2026
$7,600,000

AG2-281, AH1-536

AG2-380

DPLn7746 / ds22085r0001

MEtering & Terminal upgrades at the Edge Moor 230kV Substation

12 Months
$1,100,000

AG2-347, AH1-584, AH1-585, AH1-586, AH1-634, AH1-672

Dayton(Pending) / Dayton-TC2-18817

Replace Stuart Switches to 4000 A

48 to 60 Months
$1,200,000

AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721

Dayton(Pending) / Dayton-TC2-18818

Replace Wavetrap to 4000 A

48 to 60 Months
$100,000

AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721

Daytonn9670.0 / DAYr190039

Reconductor Stuart-Spurlock line with twin bundle 1033 Curlew ACCR conductor.

60 to 72 Months
$50,000,000

AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721

Daytonn9671.0 / DAYr190040

Replace Stuart substation bus and conductor

48 to 60 Months
$1,000,000

AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721

Daytonn9672.0 / DAYr190041

Replace Stuart substation breakers to 4000 A breakers

48 to 60 Months
$2,000,000

AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721

Dominion(Pending)

Dominion work to accomodate new Person - Hendrick 230 kV tie line

42 to 48 Months
$8,894,000

AG2-077, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-581, AG2-583, AG2-659, AH1-056, AH1-241, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546

Dominion(Pending) / TC1-PH1-DOM-006

Add a 3rd new 224 MVA 115/230 kV Transformer at Cloud substation, one (1) 230 kV breaker and one (1) 115 kV breaker.

42 to 44 Months
$11,000,000

AG2-171, AG2-213, AG2-270, AG2-341, AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-056, AH1-408

AH1-215

Dominion(Pending) / TC1-PH1-DOM-023

Replace Wave Trap 153WT at Oak Green 115 kV.

16 to 18 Months
$300,000

AH1-676

Dominion(Pending) / TC1-PH1-DOM-024

Replace 1590 ACSR line lead on Line 153 at Oak Green 115 kV

12 to 18 Months
$400,000

AH1-676

Dominion(Pending) / TC1-PH1-DOM-079

Replace Wave Trap 567 WT at Surry 500 kV

16 to 18 Months
$600,000

AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-570, AG2-571, AH1-040, AH1-528, AH1-716

Dominion(Pending) / TC1-PH1-DOM-083

Wreck and Rebuild 2.48 miles of 115 kV line between Oak Green and Orange Tap

30 to 36 Months
$7,936,000

AH1-676

Dominion(Pending) / TC1-PH1-DOM-096

Wreck and rebuild 2.8 mi of 115 kV Line 15 between Huber DP and Sedgehill with (1) 768,2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C

30 to 36 Months
$8,960,000

AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343

Dominion(Pending) / TC1-PH2-DOM-0012

Wreck and rebuild 8.1 miles of 230 kV Line 2027 (future Line 2323) between Bremo and AG2-583 with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

36 to 42 Months
$30,780,000

AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC1-PH3-DOM-007

Replace Wave Trap 2028WT at Charlottesville

16 to 18 Months
$400,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-0000

Replace 1590 AAC Line Lead on Line 1045 at Chase City 115 kV.

12 to 18 Months
$400,000

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396

AH1-215

Dominion(Pending) / TC2-PH1-DOM-0001

Replace Switch 104515 at Chase City 115 kV with a 3000A Switch.

12 to 18 Months
$300,000

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396

AH1-215

Dominion(Pending) / TC2-PH1-DOM-0002

Wreck and Rebuild 0.88 miles of 115 kV Line 1045 between Butcher Creek and Chase City with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

30 to 36 Months
$3,234,800

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396

AH1-215

Dominion(Pending) / TC2-PH1-DOM-0003

Replace 1351 ACSR Line Lead on Line 154 at Pamplin 115 kV.

12 to 18 Months
$400,000

AG2-440, AG2-441, AG2-442, AH1-215

Dominion(Pending) / TC2-PH1-DOM-0004

Wreck and rebuild 5.93 miles of 115 kV Line 154 between AG2-440 and Madisonville DP with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

30 to 36 Months
$21,822,400

AG2-440, AG2-441, AG2-442, AH1-215

Dominion(Pending) / TC2-PH1-DOM-0007

Replace 1351 ACSR Line Lead on Line 154 at AF2-222 115kV.

12 to 18 Months
$400,000

AG2-440, AG2-441, AG2-442, AH1-056

Dominion(Pending) / TC2-PH1-DOM-0008

Replace 1351 ACSR Line Lead on Line 154 at Twittys Creek 115kV.

12 to 18 Months
$400,000

AG2-440, AG2-441, AG2-442, AH1-056

Dominion(Pending) / TC2-PH1-DOM-0009

Wreck and Rebuild 0.05 miles of 115 kV Line 158 between Flat Creek and Moran DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE".

30 to 36 Months
$160,000

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396, AH1-408

AG2-341, AH1-215

Dominion(Pending) / TC2-PH1-DOM-0010

Wreck and Rebuild 5.36 miles of 115 kV Line 158 between Farmville and Moran DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE".

30 to 36 Months
$17,152,000

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396, AH1-408

AG2-341, AH1-215

Dominion(Pending) / TC2-PH1-DOM-0011

Replace 795 AAC Line Lead on Line 158 at Farmville 115 kV.

12 to 18 Months
$400,000

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396, AH1-408

AG2-341, AH1-215

Dominion(Pending) / TC2-PH1-DOM-0013

Wreck and rebuild 1.51 miles of 230 kV Line 2027 (future Line 2323) between Cartersville and AG2-583 with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

36 to 42 Months
$5,738,000

AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-0014

Wreck and rebuild 0.17 miles of 230 kV Line 2027 between Midlothian and Powhatan with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

36 to 42 Months
$646,000

AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-0018

Replace 2-795 AAC line lead on Line 2074 at Lousia CT 230 kV.

12 to 18 Months
$500,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0019

Wreck and rebuild 0.4 miles of 230 kV Line 2074 between Louisa CT and South Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$1,520,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0020

Wreck and rebuild 0.63 miles of 230 kV Line 2074 between Louisa CT and South Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$2,394,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0027

Wreck and rebuild 13.05 miles of 230 kV Line 2202 between Desper and South Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 Degrees C.

42 to 48 Months
$49,590,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0028

Wreck and rebuild 0.63 miles of 230 kV Line 2202 between Desper and South Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 Degrees C

36 to 42 Months
$2,394,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0029

Replace Switch 220216 at South Anna 230 kV with a 4000A switch.

12 to 18 Months
$400,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0030

Replace (2) 3-1/2" AL Pipe Line Leads on Line 2202 and Breaker Leads at South Anna 230 kV.

12 to 18 Months
$1,000,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0031

Replace 2-1590 AAC Line Lead on Line 2202 at Desper 230 kV.

12 to 18 Months
$500,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0032

Replace Wave Trap 2202WT at Desper 230 kV.

16 to 18 Months
$400,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0033

Replace Wave Trap 2202WT at South Anna 230 kV.

16 to 18 Months
$400,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0034

Replace Breaker 2074T2202 at South Anna 230 kV.

42 to 48 Months
$2,000,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-0035

Wreck and rebuild 0.37 miles of 115 kV Line 4 between Cobbs Creek and AH1-241 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

30 to 36 Months
$1,184,000

AH1-241

Dominion(Pending) / TC2-PH1-DOM-0043

Wreck and rebuild 3.62 miles of 230 kV Line 2091 between Chickahominy and Elko with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$13,756,000

AG2-010, AG2-646, AH1-042, AH1-157, AH1-716

Dominion(Pending) / TC2-PH1-DOM-0044

Wreck and rebuild 4.5 miles of 230 kV Line 2204 between Black Walnut and Edmonson with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$17,100,000

AG2-068, AG2-069, AG2-152, AG2-369, AG2-541, AG2-570, AG2-571, AH1-314, AH1-343

Dominion(Pending) / TC2-PH1-DOM-0045

Wreck and rebuild 8.3 miles of 230 kV Line 2250 between Edmonson and Sedge Hill with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$31,540,000

AG2-068, AG2-069, AG2-077, AG2-152, AG2-188, AG2-198, AG2-270, AG2-369, AG2-440, AG2-441, AG2-442, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AH1-056, AH1-314, AH1-343, AH1-377, AH1-439, AH1-528

Dominion(Pending) / TC2-PH1-DOM-0046

Wreck and rebuild 7.28 miles of 230 kV Line 228 between Chesterfield and Hopewell with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$27,664,000

AG2-093, AG2-428, AG2-436, AG2-570, AG2-571, AH1-216, AH1-324, AH1-528, AH1-717

Dominion(Pending) / TC2-PH1-DOM-0047

Wreck and rebuild 0.88 miles of 230 kV Line 228 between Chesterfield and Hopewell with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C

36 to 42 Months
$3,344,000

AG2-093, AG2-428, AG2-436, AG2-570, AG2-571, AH1-216, AH1-324, AH1-528, AH1-717

Dominion(Pending) / TC2-PH1-DOM-0048

Replace 2-1590 AAC line lead on Line 259 at Basin 230 kV

12 to 18 Months
$500,000

AG2-068, AG2-069, AG2-077, AG2-093, AG2-384, AG2-427, AG2-428, AG2-436, AG2-570, AG2-571, AG2-581, AH1-528, AH1-717

Dominion(Pending) / TC2-PH1-DOM-0049

Wreck and rebuild 12.98 miles of 230 kV Line 283 between Elmont and Northeast with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees

42 to 48 Months
$49,324,000

AG2-428, AG2-436, AG2-570, AG2-571, AH1-042, AH1-528, AH1-717

Dominion(Pending) / TC2-PH1-DOM-0050

Wreck and rebuild 13.78 miles of 230 kV Line 287 between Chesterfield and Chickahominy with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

42 to 48 Months
$52,364,000

AG2-093, AG2-646

Dominion(Pending) / TC2-PH1-DOM-0051

Wreck and rebuild 0.003 miles of 230 kV Line 296 between Sedge Hill and Alton Post (AC1-221) with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$11,400

AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-343, AH1-377, AH1-439, AH1-528

Dominion(Pending) / TC2-PH1-DOM-0063

Wreck and rebuild 1.66 miles of 115 kV Line 154 between AF2-222 and Twittys Creek with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

30 to 36 Months
$6,108,800

AG2-440, AG2-441, AG2-442, AH1-056

Dominion(Pending) / TC2-PH1-DOM-0071

Wreck and rebuild 14.02 miles of 500 kV Line 573 between Spotsylvania and North Anna with (3) 1351.5 ACSS TW/HS285 (42/19) "MARTIN".

18 to 48 Months
$82,718,000

AG2-088, AG2-436, AH1-528, AH1-676, AH1-681, AH1-712, AH1-716, AH1-723

Dominion(Pending) / TC2-PH1-DOM-0072

Replace 2-2500 ACAR 84/7 line lead on Line 573 at North Anna 500 kV

12 to 18 Months
$600,000

AG2-088, AG2-436, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723

Dominion(Pending) / TC2-PH1-DOM-0073

Replace Wave Trap 573WT at Spotsylvania 500 KV

16 to 18 Months
$600,000

AG2-088, AG2-436, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723

Dominion(Pending) / TC2-PH1-DOM-0075

Wreck and rebuild 18.75 miles of 500 kV Line 594 between Spotsylvania and Morrisville with (3) 1351.5 ACSS TW/HS285 (42/19) "MARTIN"

18 to 60 Months
$110,625,000

AG2-088, AG2-428, AG2-436, AG2-570, AG2-571, AH1-263, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723

Dominion(Pending) / TC2-PH1-DOM-0076

Replace Wave Trap 594WT at Morrisville 500 KV

16 to 18 Months
$600,000

AG2-088, AG2-436, AH1-263, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723

Dominion(Pending) / TC2-PH1-DOM-0077

Replace Wave Trap 594WT at Spotsylvania 500 KV

16 to 18 Months
$600,000

AG2-088, AG2-436, AH1-263, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723

Dominion(Pending) / TC2-PH1-DOM-0078

Replace 3-1590 AAC 61 line lead on Line 594 at Morrisville 500 kV

12 to 18 Months
$600,000

AG2-088, AG2-436, AH1-263, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723

Dominion(Pending) / TC2-PH1-DOM-0080

Replace switch 219326 at Bremo 230 kV

12 to 18 Months
$400,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-1000

Wreck and rebuild 0.05 miles of 115 kV Line 44 between Oak Ridge to Myrtle with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

30 to 36 Months
$160,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-1001

Replace 795 AAC Line Lead on Line 44 at Myrtle 115 kV.

12 to 28 Months
$400,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-1002

Wreck and rebuild 0.04 miles of 115 kV Line 44 between Myrtle and AD2-085 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

30 to 36 Months
$128,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-1003

Replace 795 AAC Line Lead on Line 44 at Myrtle 115 kV.

12 to 18 Months
$400,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-1004

Wreck and rebuild 0.07 miles of 115 kV Line 44 between Bell Avenue to Windsor DP (CEC) with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

30 to 36 Months
$224,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-1005

Wreck and rebuild 0.10 miles of 115 kV Line 99 between Peninsula and AG2-010 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

30 to 36 Months
$320,000

AG2-010

Dominion(Pending) / TC2-PH1-DOM-1007

Wreck and rebuild 0.87 miles of 230 kV Line 2083 between Fredericksburg to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

36 to 42 Months
$3,306,000

AG2-005, AG2-215, AG2-366, AG2-469, AG2-646, AH1-042, AH1-157, AH1-716

Dominion(Pending) / TC2-PH1-DOM-1008

Replace 3 & 1/2" Line Lead on Line 2157 at Cranes Corner 230 kV.

12 to 18 Months
$500,000

AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694

Dominion(Pending) / TC2-PH1-DOM-1009

Replace 2 x 2-1590 Line Leads on Line 2157 at Cranes Corner 230 kV.

12 to 18 Months
$1,000,000

AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694

Dominion(Pending) / TC2-PH1-DOM-1010

Replace Breaker 2104T2157 at Cranes Corner 230 kV.

42 to 48 Months
$2,000,000

AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694

Dominion(Pending) / TC2-PH1-DOM-1011

Replace 1033.5 ACSR Line Lead on Line 2157 at Fredericksburg 230 kV.

12 to 18 Months
$500,000

AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694

Dominion(Pending) / TC2-PH1-DOM-1013

Re-conductor 5.8 mi of 230 kV underground cable 2120 from Garrisonville to Aquia Harbor with 2-5000 kcmil CU.

36 to 42 Months
$116,000,000

AG2-428, AG2-469, AH1-042, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694

Dominion(Pending) / TC2-PH1-DOM-1014

Wreck and rebuild 0.73 miles of 115 kV line 1012 between AH1-215 and Twittys Creek with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C.

30 to 36 Months
$2,686,400

AG2-440, AG2-441, AG2-442, AH1-056

Dominion(Pending) / TC2-PH1-DOM-1015

Replace 1351.5 ACSR risers on 115 kV line 1012 between AH1-215 and Twittys Creek with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C

12 to 18 Months
$10,000

AG2-440, AG2-441, AG2-442, AH1-056

Dominion(Pending) / TC2-PH1-DOM-1016

Replace 1351 ACSR line lead on line 1012 at Twitty's Creek 115 kV

12 to 18 Months
$400,000

AG2-440, AG2-441, AG2-442, AH1-056

Dominion(Pending) / TC2-PH1-DOM-1017

Replace wave traps 1012WT and 154WT at Twitty's Creek 115 kV

16 to 18 Months
$600,000

AG2-440, AG2-441, AG2-442, AH1-056

Dominion(Pending) / TC2-PH1-DOM-1019

Wreck and rebuild 0.73 miles of 115 kV line 1012 between Central and AH1-215 with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C.

30 to 36 Months
$2,686,400

AG2-188, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215, AH1-439

AH1-546

Dominion(Pending) / TC2-PH1-DOM-1021

Wreck and rebuild 8.94 miles of 115 kV line 1012 between AG1-285 and Chase City with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C.

30 to 36 Months
$32,899,200

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-1023

Replace switch 101215 at Chase City 115 kV

12 to 18 Months
$300,000

AG2-188, AG2-198, AG2-440, AG2-441, AG2-442, AG2-566, AH1-056, AH1-215, AH1-439, AH1-546

Dominion(Pending) / TC2-PH1-DOM-1024

Wreck and rebuild 5.62 miles of 115 kV line 1012 between Chase City and AG1-285 with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C.

30 to 36 Months
$20,681,600

AG2-188, AG2-198, AG2-440, AG2-441, AG2-442, AG2-566, AH1-056, AH1-215, AH1-439, AH1-546

Dominion(Pending) / TC2-PH1-DOM-1025

Replace jumper 768.2 ACSS with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C.

12 to 18 Months
$5,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-1026

Replace wave trap 1012WT at Chase City 115 kV

16 to 18 Months
$300,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-1027

Replace switch 101214 at Chase City 115 kV

12 to 18 Months
$300,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-1031

Wreck and rebuild 12.94 miles of 230 kV Line 235 from Briery to Farmville with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C.

42 to 48 Months
$49,172,000

AG2-077, AG2-198, AG2-270, AG2-566, AG2-581, AH1-377, AH1-528

Dominion(Pending) / TC2-PH1-DOM-1032

Wreck and rebuild 0.73 miles of 230 kV line 235 between AG1-098 and Finneywood with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C

36 to 42 Months
$2,774,000

AG2-077, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-215, AH1-217, AH1-241, AH1-280, AH1-377, AH1-439, AH1-528, AH1-546, AH1-676, AH1-687

Dominion(Pending) / TC2-PH1-DOM-1036

Wreck and rebuild 37.41 mi of 500 kV line 563 between Carson and Midlothian with (3) 1351.5 ACSS TW/HS285 (42/19) "MARTIN" at 145 degrees C

48 to 60 Months
$157,122,000

AG2-068, AG2-069, AG2-077, AG2-338, AG2-339, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-570, AG2-571, AG2-581, AH1-528, AH1-716

Dominion(Pending) / TC2-PH1-DOM-1037

Replace Breaker 56372 at Carson 500 kV with 5000 Amp device

42 to 48 Months
$2,750,000

AG2-068, AG2-069, AG2-338, AG2-339, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-570, AG2-571, AG2-581, AH1-528

Dominion(Pending) / TC2-PH1-DOM-1042

Add a 2nd new 224 MVA 115/230 kV Transformer at Harmony Village substation and add one (1) 115 kV breaker and one (1) 230 kV breaker

42 to 48 Months
$17,500,000

AG2-005, AG2-366

AH1-397

Dominion(Pending) / TC2-PH1-DOM-2001

Wreck and rebuild 2.66 miles of 115 kV line 1016 between Crystal Hill DP and AH1-343 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

30 to 36 Months
$8,512,000

AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343

Dominion(Pending) / TC2-PH1-DOM-2002

Replace 556.6 ACSR line lead on line 104 at AltaVista 138 kV

12 to 18 Months
$400,000

AG2-152, AG2-311

Dominion(Pending) / TC2-PH1-DOM-2004

Replace 2-1590 AAC 61 line lead on line 2032 at Four Rivers 230 kV.

12 to 18 Months
$500,000

AG2-208, AG2-428, AG2-436, AG2-570, AG2-571, AH1-042, AH1-323, AH1-528, AH1-679, AH1-681, AH1-712, AH1-723

Dominion(Pending) / TC2-PH1-DOM-2005

Wreck and rebuild 5.74 mi of 230 kV Line 230 between Four Rivers and Hanover with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C

36 to 42 Months
$21,812,000

AG2-208, AG2-428, AG2-436, AG2-570, AG2-571, AH1-042, AH1-323, AH1-528, AH1-679, AH1-681, AH1-712, AH1-723

Dominion(Pending) / TC2-PH1-DOM-2007

Replace Line Lead on Line 71 at Clubhouse 115 kV

12 to 18 Months
$400,000

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-408

AG2-077, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2008

Wreck and rebuild 0.47 miles of 230 kV Line 2241 between Hendrick and Alton Post with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$1,786,000

AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-343, AH1-377, AH1-439, AH1-528

Dominion(Pending) / TC2-PH1-DOM-2009

Replace Wave Trap 11WT at Oak Green 115 kV

16 to 18 Months
$300,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2010

Replace 1590 AAC 61 line lead on Line 11 at Oak Green 115 kV

12 to 18 Months
$400,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2011

Wreck and rebuild 3.25 mi of 115 kV Line 15 between Disputanta and Poe with (1) 768,2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C

30 to 36 Months
$10,400,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2012

Wreck and rebuild 6.68 mi of 115 kV Line 15 between Pumphouse and Poe with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C

30 to 36 Months
$24,582,400

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2013

Wreck and rebuild 0.05 mi of 115 kV Line 15 between Pumphouse and Poe with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C

30 to 36 Months
$184,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2014

Replace 795 AAC 37 line lead on Line 15 at Poe 115 kV

12 to 18 Months
$400,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2015

Replace switch 1554 at Poe 115 kV

12 to 18 Months
$300,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2016

Replace/Remove Relay Trip at Poe

20 to 26 Months
$750,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2017

Remove Wave Trap 15WT at Poe 115 kV

16 to 18 Months
$300,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2018

Wreck and rebuild 0.07 miles 115 kV Line 15 between Bell Ave and Wakefield with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C

30 to 36 Months
$224,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2019

Wreck and rebuild 3.85 miles 115 kV Line 15 between Wakefield and AG2-426 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C

30 to 36 Months
$12,320,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2020

Wreck and rebuild 2.45 miles of 115 kV Line 15 between Waverly and Waverly DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C

30 to 36 Months
$7,840,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2021

Wreck and rebuild 0.09 miles 115 kV Line 15 between Waverly and Waverly DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C

30 to 36 Months
$288,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2022

Wreck and rebuild 0.03 miles of 115 kV Line 15 between Waverly and Waverly DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C, and replace jumper with higher rated equipment

30 to 36 Months
$101,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2023

Wreck and rebuild 5.94 miles of 115 kV Line 15 between Waverly DP and Disputanta with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 deg. C

30 to 36 Months
$19,008,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2024

Wreck and rebuild 4.40 miles 115 kV Line 15 between Waverly and AG2-426 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C

30 to 36 Months
$14,080,000

AG2-426, AG2-427, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2025

Wreck and rebuild 0.07 miles 115 kV Line 15 between Waverly and AG2-426 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C

30 to 36 Months
$224,000

AG2-426, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2026

Replace 115 kV Line 15 jumpers between Waverly and AG2-426 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C

12 to 18 Months
$5,000

AG2-426, AG2-428

Dominion(Pending) / TC2-PH1-DOM-2027

Replace switches 8434 and 8435 at Farmville 115 kV

12 to 18 Months
$600,000

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2028

Wreck and rebuild 4.46 miles of 115 kV line 84 between Willis Mt. and Farmville with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C

30 to 36 Months
$16,412,800

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2029

Replace 2-795 AAC line lead on line 84 at Farmville 115 kV

12 to 18 Months
$400,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2030

Replace wave trap 84WT at Farmville 115 kV

16 to 18 Months
$300,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2031

Replace switch 8426 at Willis Mt 115 kV

12 to 18 Months
$300,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2032

Replace CT primaries at Farmville 115 kV

24 Months
$750,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2033

Replace 2-1590 AAC line lead on line 84 at Farmville 115 kV

12 to 18 Months
$400,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2034

Replace CT Secondaries at Farmville 115 kV

24 Months
$750,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2035

Replace breaker 8432 at Farmville 115 kV

42 to 48 Months
$1,500,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2036

Wreck and rebuild 13.26 miles of 115 kV line 84 between Pamplin and Willis Mt. with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C

36 to 40 Months
$48,796,800

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2037

Wreck and rebuild 0.1 miles of 115 kV line 84 between Pamplin and Willis Mt. with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C

30 to 36 Months
$368,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2038

Replace wave trap 84WT at Pamplin 115 kV

16 to 18 Months
$300,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2039

Replace 1351 ACSR line lead on line 84 at Pamplin 115 kV

12 to 18 Months
$400,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2040

Replace switch 8429 at Willis Mt 115 kV

12 to 18 Months
$300,000

AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominion(Pending) / TC2-PH1-DOM-2042

Replace 2-795 AAC line lead on line 1059 at Northern Neck 115 kV

12 to 18 Months
$400,000

AG2-005, AG2-366

Dominion(Pending) / TC2-PH1-DOM-2043

Wreck and rebuild 0.93 miles of 230 kV Line 2241 between Hendrick and Persons with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. Dominion portion of line only.

36 to 42 Months
$3,534,000

AG2-068, AG2-069, AG2-077, AG2-111, AG2-112, AG2-151, AG2-152, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-272, AG2-341, AG2-369, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AG2-659, AH1-056, AH1-215, AH1-241, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-535, AH1-546, AH1-687, AH1-690, AH1-721

AG2-660, AH1-044, AH1-150, AH1-151

Dominion(Pending) / TC2-PH1-DOM-2044

Wreck and rebuild 0.03 miles of 115 kV Line 65 between Rappahannock and White Stone with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C

30 to 36 Months
$110,400

AG2-005, AG2-366

Dominion(Pending) / TC2-PH1-DOM-2045

Wreck and rebuild 1.33 miles of 115 kV Line 65 between White Stone and Ocran with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C

30 to 36 Months
$4,894,400

AG2-005, AG2-215, AG2-366

Dominion(Pending) / TC2-PH1-DOM-2047

Wreck and rebuild 0.04 mi of 115 kV line 65 from Ocran to Lancaster with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C.

30 to 36 Months
$147,200

AG2-005, AG2-366

Dominion(Pending) / TC2-PH1-DOM-2048

Wreck and rebuild 2.97 mi of 115 kV line 65 from Ocran to Lancaster with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C.

30 to 36 Months
$10,929,600

AG2-005, AG2-215, AG2-366

Dominion(Pending) / TC2-PH1-DOM-2049

Wreck and rebuild 5.86 mi of 115 kV line 65 from Lancaster to AG1-146 with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C. and replace 636 ACSR and 1534 ACAR Jumper.

30 to 36 Months
$21,569,800

AG2-005, AG2-215, AG2-366, AG2-469

Dominion(Pending) / TC2-PH1-DOM-2052

Wreck and rebuild 0.74 miles of 230 kV Line 2304 between Desper and Louisa Pumping Station with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C

36 to 42 Months
$2,812,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2053

Replace MAINLINE JUMPER 1590 ACSR (45/7) @150 Deg. C with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C

12 to 18 Months
$10,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2054

Replace 2-1590 AAC 61 line lead on Line 2304 at Desper 230 kV

12 to 18 Months
$500,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2055

Replace wavetrap 255WT at Desper 230 kV

16 to 18 Months
$400,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2056

Replace switch 25599 at Louisa Pumping 230 kV

12 to 18 Months
$400,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2057

Wreck and rebuild 0.25 miles of 230 kV Line 2304 between Louisa Pumping Station and Louisa with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C

36 to 42 Months
$950,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2058

Replace MAINLINE JUMPER 1590 ACSR (45/7) @150 Deg. C with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C

12 to 18 Months
$10,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2059

Wreck and rebuild 7.57 miles of 230 kV Line 2304 between Louisa and AH1-012 with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C

36 to 42 Months
$28,766,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2060

Wreck and rebuild 7.83 miles of 230 kV Line 2304 between AH1-012 and Southall with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C

36 to 42 Months
$29,754,000

AH1-012, AH1-676

Dominion(Pending) / TC2-PH1-DOM-2061

Wreck and rebuild 0.82 miles of 230 kV Line 255 between Southall and North Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C

36 to 42 Months
$3,116,000

AH1-012, AH1-676

Dominion(Pending) / TC2-PH1-DOM-2062

Replace 2-1590 AAC line lead on line 255 at North Anna 230 kV

12 to 18 Months
$500,000

AH1-012, AH1-676

Dominion(Pending) / TC2-PH1-DOM-2063

Wreck and rebuild 0.11 miles of 230 kV line 2193 between Fork Union and Bremo Dist with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C

36 to 42 Months
$418,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2064

Replace 2-1590 line lead on line 2193 at Fork Union 230 kV

12 to 18 Months
$500,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2065

Replace switches 219324 and 219325 at Bremo 230 kV

12 to 18 Months
$800,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2066

Replace 2-636 ACSR line lead on line 2193 at Bremo 230 kV

12 to 18 Months
$500,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2067

Replace 3 1/2" pipe line lead on line 2193 at Bremo 230 kV

12 to 18 Months
$500,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2068

Wreck and rebuild 0.12 miles of 230 kV line 2028 between Fork Union and Grape Vine with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C

36 to 42 Months
$456,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2069

Replace 2-1590 AAC line lead on line 2028 at Fork Union 230 kV

12 to 18 Months
$500,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2070

Replace wave trap 2028WT at Fork Union 230 kV

16 to 18 Months
$400,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2071

Replace 2-1590 line lead on line 2028 at Mt. Eagle 230 kV

12 to 18 Months
$500,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2072

Replace 2500 ACAR line lead on line 2028 at Charlottesville 230 kV

12 to 18 Months
$500,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2073

Replace 2-1590 line lead on line 2028 at Charlottesville and Mt Eagle 230 kV

12 to 18 Months
$500,000

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominion(Pending) / TC2-PH1-DOM-2074

Rebuild underground line from Harmony Village to Greyspoint and operating the line at 230 kV.

48 to 60 Months
$53,000,000

AG2-005, AG2-215, AG2-366

Dominion(Pending) / TC2-PH1-DOM-2076

Replace wave trap 298 WT at Bremo 230 kV

12 to 18 Months
$400,000

AG2-068, AG2-069, AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546

Dominion(Pending) / TC2-PH1-DOM-2077

Replace switches 29824 and 29825 at Bremo 230 kV

12 to 18 Months
$800,000

AG2-068, AG2-069, AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546

Dominion(Pending) / TC2-PH1-DOM-2078

Replace 2-636 ACSR line lead on line 298 at Bremo 230 kV

12 to 18 Months
$500,000

AG2-068, AG2-069, AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546

Dominion(Pending) / TC2-PH1-DOM-2079

Replace 3 1/2 " AL Pipe line lead on line 298 at Bremo 230 kV

12 to 18 Months
$500,000

AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-341, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546

Dominion(Pending) / TC2-PH1-DOM-2085

Replace wavetrap 298WT at Farmville 230 kV

16 to 18 Months
$400,000

AG2-068, AG2-069, AG2-077, AG2-171, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-528

Dominion(Pending) / TC2-PH1-DOM-2086

Replace 3 1/2' AL Pipe line lead on line 298 at Farmville 230 kV

12 to 18 Months
$500,000

AG2-077, AG2-171, AG2-198, AG2-213, AG2-270, AG2-341, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-215, AH1-343, AH1-377, AH1-408, AH1-528

Dominion(Pending) / TC2-PH1-DOM-2087

Replace 2-1590 AAC 61 line lead on line 298 at Farmville 230 kV

12 to 18 Months
$500,000

AG2-077, AG2-171, AG2-198, AG2-213, AG2-270, AG2-341, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-215, AH1-343, AH1-377, AH1-408, AH1-528

Dominion(Pending) / TC2-PH1-DOM-2090

Add a 3rd new 3-480 MVA 230/500 kV Transformer at Elmont substation. Add one (1) 500 kV breaker and one (1) 230 kV breaker as required for the new transformer

42 to 48 Months
$40,000,000

AG2-382, AG2-427, AG2-428, AG2-436, AG2-570, AG2-571, AG2-581, AG2-646, AH1-040, AH1-042, AH1-216, AH1-271, AH1-323, AH1-324, AH1-408, AH1-528, AH1-717

Dominion(Pending) / TC2-PH1-DOM-2091

Replace the existing Finneywood 230/500 kV XFRM T1 with a 3-480 MVA rated device

42 to 48 Months
$40,000,000

AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-659, AH1-056, AH1-377, AH1-439

Dominion(Pending) / TC2-PH1-DOM-2092

Replace the existing Finneywood 230/500 kV XFRM T2 with a 3-480 MVA rated device

42 to 48 Months
$40,000,000

AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-659, AH1-056, AH1-377, AH1-439

Dominion(Pending) / TC2-PH1-DOM-2094

Replace 115 kV 768.2 Jumper on line 65 between Ocran and Lancaster with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C.

12 to 18 Months
$5,000

AG2-005, AG2-366

Dominion(Pending) / TC2-PH1-DOM-2095

Wreck and rebuild 7.90 miles of 230 kV Line 2199 between Germanna and Cirrus with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

36 to 42 Months
$30,020,000

AH1-676

Dominion(Pending) / TC2-PH1-DOM-2097

Build a new 11.95 mile line from Aspen 230 kV to Dickerson 230 kV with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C.

48 to 60 Months
$33,230,000

AG2-304, AG2-436, AG2-570, AG2-571, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723, AH1-727, AH1-729

Dominion(Pending) / dom-164

Wreck and rebuild 7.08 miles of 230 kV Line 208 between Ironbridge and Southwest with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$26,904,000

AG2-093, AG2-428, AG2-646, AH1-042, AH1-717

Dominion(Pending) / dom-184

Wreck and rebuild 0.97 mi of 115 kV Line 15 between Woodchuck Trail and Huber DP with (1) 768,2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C

30 to 36 Months
$3,104,000

AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343

Dominionb3692

Rebuild approximately 27.7-miles of 500 kV transmission line from Elmont to Chickahominy.

Jun 01 2026
Contingent

AG2-077, AG2-428, AG2-436, AG2-570, AH1-040, AH1-528, AH1-716

Dominionb3694.1

Convert line #29 Aquia Harbor to Possum Point to 230 kV (Extended line #2104) and swap line #2104 and converted line #29 at Aquia Harbor backbone termination.

Sep 28 2029
Contingent

AG2-320, AG2-436, AG2-469, AH1-042, AH1-528

Dominionb3694.4

Reconductor/rebuild approx 7.6 miles of 230 kV line #2104 Cranes Corner-Stafford. Reconductor/rebuild approx 0.34 miles of 230 kV line #2104 Stafford-Aquia Harbor. Upgrade terminal equipment.

Apr 17 2026
Contingent

AG2-320, AG2-436, AG2-469, AH1-042, AH1-528

Dominionb3694.8

Partial wreck and rebuild 10.34 miles of 230 kV line #249 Carson-Locks to achieve a minimum summer emergency rating of 1572 MVA.

May 03 2025
Contingent

AG2-077, AG2-436, AG2-570, AH1-408, AH1-528

Dominionb3800.242

Upgrading switches 20366M and 20369M and line leads to 4000A continuous current rating of 230kV Line #203 at Edwards Ferry substation

Sep 13 2030
Contingent

AG2-436, AG2-570, AH1-528, AH1-676, AH1-712, AH1-723, AH1-727

Dominionb3800.300

Wreck/Rebuild 230kV Line #2135 segment Hollymeade Junction – Cash’s Corner using double-circuit capable 230 kV poles. (The second 230kV circuit will be wired but not have terminal ends.)

Jun 30 2028
Contingent

AG2-151, AG2-188, AG2-583, AH1-241, AH1-712, AH1-723

Dominionb3800.302

Upgrade Cash's Corner switches 213576 and 213579 and line leads to 4000A continuous current rating of 230kV Line #2135.

Jun 30 2028
Contingent

AG2-151, AG2-188, AG2-583, AH1-241, AH1-712, AH1-723

Dominionb4000.300

Rebuild approximately 1.71 miles of 230kV line 299 from the Marsh Run substation to the Remington CT substation. New conductor has a summer rating of 1573 MVA.

May 30 2029
Contingent

AH1-086, AH1-676

Dominionb4000.303

Uprate line #299 terminal equipment, line leads, and bus at Remington CT substation to be rated to 4000A.

May 30 2029
Contingent

AH1-086, AH1-676

Dominionb4000.314

Reconductor 230kV Line #2003 Chesterfield – Tyler segment. New conductor has a summer rating of 1573 MVA

Apr 22 2030
Contingent

AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-528

Dominionb4000.315

Reconductor 230kV Line #2003 Tyler – Poe segment. New conductor has a summer rating of 1573 MVA.

Apr 22 2030
Contingent

AG2-068, AG2-069, AG2-077, AG2-339, AG2-426, AG2-427, AG2-428, AG2-436, AG2-570, AG2-581, AH1-408, AH1-528

Dominionb4000.316

At Poe substation, uprate all Line #2003 terminal equipment, line leads, and bus to be rated to 4000A.

Apr 22 2030
Contingent

AG2-068, AG2-069, AG2-077, AG2-339, AG2-426, AG2-427, AG2-428, AG2-436, AG2-570, AG2-581, AH1-408, AH1-528

Dominionb4000.317

At Tyler substation, upgrade the necessary line terminal equipment to maintain 4000A at Tyler substation.

Apr 22 2030
Contingent

AG2-068, AG2-069, AG2-077, AG2-339, AG2-426, AG2-427, AG2-428, AG2-436, AG2-570, AG2-581, AH1-408, AH1-528

Dominionb4000.317

At Tyler substation, upgrade the necessary line terminal equipment to maintain 4000A at Tyler substation.

Apr 22 2030
Contingent

AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-528

Dominionb4000.319

Reconductor 230kV Line #2002 Carson – Poe. New conductor has a summer rating of 1573 MVA.

Mar 20 2030
Contingent

AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-377, AH1-408, AH1-528

Dominionb4000.320

At Carson substation, upgrade all line #2002 terminal equipment at Carson to 4000A. CCVTs will also be replaced due to aging.

Mar 20 2030
Contingent

AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-377, AH1-408, AH1-528

Dominionb4000.321

At Poe substation, upgrade all line #2002 terminal equipment at Carson to 4000A. CCVTs will also be replaced due to aging.

Mar 20 2030
Contingent

AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-377, AH1-408, AH1-528

Dominionb4000.326

At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.

Feb 24 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.327

Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.

Feb 24 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.334

Reconductor 115kV line #121 from Poe - Prince George. Specifically, line #121 will be reconductored and converted to 230kV from Poe substation to Prince George substation.

Jan 10 2030
Contingent

AG2-093, AG2-095, AG2-427, AG2-661, AH1-216, AH1-324, AH1-717

Dominionb4000.335

At Poe substation, install a new 230kV six breaker ultimate ring bus which will fit the station to current 230kV standards.

Jan 10 2030
Contingent

AG2-093, AG2-095, AG2-427, AG2-661, AH1-216, AH1-324, AH1-717

Dominionb4000.336

Build a new 230-115kV Prince George substation along the existing 115 or 230kV corridor.

Jan 10 2030
Contingent

AG2-093, AG2-095, AG2-427, AG2-661, AH1-216, AH1-324, AH1-717

Dominionb4000.341

Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.

Jul 13 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.342

Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.

Jul 13 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.343

Uprate bus at Brambleton to support 500kV Line #558 (Aspen to Brambleton) uprate.

Nov 28 2025
Contingent

AG2-347, AG2-428, AG2-436, AG2-570, AH1-528, AH1-676, AH1-695, AH1-712, AH1-723, AH1-727

Dominionb4000.344

Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.

Sep 16 2030
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.345

Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.

Sep 16 2030
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.346

Cut-in 500kV line from Kraken substation into Yeat substation

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.348

Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.349

Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.

Sep 16 2030
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.350

Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.

Sep 16 2030
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.351

Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.

Sep 16 2030
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.352

Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.

Sep 16 2030
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.353

Upgrade 500kV terminal equipment at Elmont substation.

Jun 01 2028
Contingent

AG2-428, AG2-436, AG2-570, AH1-042, AH1-528, AH1-712, AH1-716, AH1-723

Dominionb4000.354

Ladysmith substation breakers replacement: 574T575 and 568T581

Nov 14 2029
Contingent

AG2-088, AG2-428, AG2-436, AG2-570, AH1-042, AH1-528, AH1-676, AH1-712, AH1-723

Dominionb4000.355

Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.356

Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionb4000.357

Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.

Jun 01 2029
Contingent

AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723

Dominionn6113

Add a 2nd new 224 MVA 115/230 kV Transformer at Carolina substation, expand 230 kV station to form a ring bus, add two (2) 230 kV breakers and one (1) 115 kV breaker.

42 to 44 Months
$11,000,000

AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-408

AG2-077, AG2-213

Dominionn6114

Add a 2nd 224 MVA 230/115 kV transformer and associated breakers at Clubhouse substation.

Feb 28 2027
$24,500,000

AG2-213, AG2-237, AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-056, AH1-408

AG2-077, AG2-171

Dominionn6215

Wreck and rebuild 18.56 miles of 230 kV Line 296 between Sedge Hill and Alton Post (AC1-221) with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

42 to 48 Months
$70,528,000

AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-343, AH1-377, AH1-439, AH1-528

Dominionn6363

Wreck and rebuild 2.59 miles of 115 kV Line 44 between Suffolk and Oak Ridge with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

30 to 36 Months
$8,288,000

AG2-426, AG2-427, AG2-428

Dominionn6365

Wreck and rebuild 5.19 miles of 115 kV Line 44 between Oak Ridge to Myrtle with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

30 to 36 Months
$16,608,000

AG2-426, AG2-427, AG2-428

Dominionn6375 / dom-095

Wreck and rebuild 1.96 mi of 115 kV Line 15 between Spotsylvania and Paytes Tap with (1) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C

Dec 31 2028
$6,272,000

AH1-676

Dominionn6388

Wreck and rebuild 9.32 miles of 115 kV Line 44 between Bell Avenue to Windsor DP (CEC) with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

30 to 36 Months
$29,824,000

AG2-426, AG2-427, AG2-428

Dominionn6389

Wreck and rebuild 5.92 miles 115 kV Line 15 between Bell Ave and Wakefield with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C

30 to 36 Months
$18,944,000

AG2-426, AG2-427, AG2-428

Dominionn6551 / dom-159

Wreck and rebuild 7.32 miles of 230 kV Line 208 between Chesterfield and Ironbridge with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$27,816,000

AG2-093, AG2-428, AG2-646, AH1-042, AH1-717

Dominionn6872 / dom-047

Wreck and rebuild 15.05 miles of 230 kV line No. 238 between Clubhouse and AE2-033 tap with (2) 768.2 ACSS/TW (20/7) at 250C.

Dec 31 2029
$59,572,939

AG2-077, AG2-270, AG2-522, AH1-408, AH1-528

Dominionn7509 / dom-261

Wreck and rebuild 0.06 miles of 115 kV Line 153 between Locust Grove DP and Unionville Tap with (1) 768.2 ACSS/TW (20/7) "MAUMEE"

30 to 36 Months
$192,000

AH1-676

Dominionn7511 / dom-367

Wreck and rebuild 2.77 miles of line 1046 between Pine Glade and Paytes Tap with (1) 768.2 ACSS/TW (20/7) "Maumee" @ 250C

30 to 36 Months
$8,864,000

AH1-676

Dominionn7541 / dom-016

Add a third 224 MVA 230/115 kV transformer at Earleys Substation and supporting equipment.

Dec 31 2029
$22,779,395

AG2-522, AG2-659, AH1-408

Dominionn7543 / dom-426

Wreck and Rebuild 0.10 miles of 115 kV Line 1045 between Butcher Creek and Chase City with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

30 to 36 Months
$368,000

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396

AH1-215

Dominionn7549 / dom-428

Replace Northern Neck 115/230 kV transformer #4 with a 224 MVA (260/271/295 MVA).

59 to 60 Months
$7,324,554

AG2-005, AG2-124, AG2-215, AG2-366

Dominionn7553 / dom-427

Replace Northern Neck 115/230 kV transformer #6 with a 224 MVA (260/271/295 MVA).

59 to 60 Months
$7,242,347

AG2-005, AG2-124, AG2-215, AG2-366

Dominionn7556 / dom-461-TC2

Reconductor 3.53 miles of 115 kV Line 65 from AD2-074 Tap to AG1-146 Tap with (1) 768.2 ACSS/TW (20/70) ""Maumee"" conductor @ 250 degrees C

43 to 44 Months
$16,493,251

AG2-005, AG2-215

Dominionn7568 / dom-369-TC2

Wreck and rebuild 6.47 miles of 230 kV transmission line 2028 between Charlottesville and Mt. Eagle with (2) 768.2 ACSS/TW (20/7) ""Maumee"" @ 250C and replace line lead at Mt. Eagle.

43 to 44 Months
$36,802,018

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominionn7569 / dom-490-TC2

Upgrade a 3.78 mile segment of 230kV transmission line 2028 between Mt. Eagle and Grape Vine Substations at structure 2080/73.

43 to 44 Months
$13,360,242

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominionn7575 / dom-286-TC2

Rebuild 6.46 mi miles of 2-545.6 ACAR (15/7) 90 MOT 230 kV Line 2083 from Fredericksburg to Fines with (2) 768.2 ACSS/TW (20/7) ""MAUMEE"" conductor @ 250 degrees C.

43 to 44 Months
$33,559,690

AG2-005, AG2-215, AG2-366, AG2-469, AG2-646, AH1-042, AH1-157, AH1-716

Dominionn7576 / dom-281-TC2

Rebuild 7.91 miles of 230 kV Line 2083 from Birchwood to Fines with (2) 768.2 ACSS/TW (20/7) ""MAUMEE"" conductor 250 degrees C.

43 to 44 Months
$35,735,843

AG2-005, AG2-215, AG2-366, AG2-469, AG2-646, AH1-042, AH1-157, AH1-716

Dominionn7612 / dom-015-TC2

Add a 4th 224 MVA 230/115 kV transformer at Suffolk substation and associated breakers (230 kV and 115 kV)

Dec 31 2028
$10,061,347

AG2-426, AG2-427, AG2-428

Dominionn7615 / dom-187

Wreck and rebuild 5.73 miles of 115 kV Line 44 between Myrtle and AD2-085 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

30 to 36 Months
$18,336,000

AG2-426, AG2-427, AG2-428

Dominionn7616 / dom-172

Wreck and rebuild 0.13 miles of 115 kV Line 44 between Myrtle and AD2-085 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

30 to 36 Months
$416,000

AG2-426, AG2-427, AG2-428

Dominionn7643 / dom-480

Add a 2nd new 224 MVA 115/230 kV Transformer at Chesterfield substation between Bus A and 115 kV station.

42 to 48 Months
$11,000,000

AG2-093, AG2-646

AH1-324, AH1-717

Dominionn7675 / dom-393

Wreck and rebuild 12.68 miles of 115 kV Line 98 between AD2-033 and Butcher Creek (AB2-060) with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C

36 to 40 Months
$40,576,000

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396

AH1-215

Dominionn7685 / dom-283-TC2

Rebuild 4.56 miles of 230 kV Line 2157 from Fredericksburg to Cranes Corner with (2) 768.2 ACSS/TW (20/7) ""MAUMEE"" conductor at 250 C and replace Line Lead at Cranes Corner.

43 to 44 Months
$15,674,813

AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694

Dominionn7687 / dom-046-TC2

Add a 3rd 230/115 kV transformer at Sedge Hill Substation and associated breakers (230 kV and 115 kV).

Jun 01 2029
$10,595,849

AG2-111, AG2-112, AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AG2-541, AH1-056, AH1-343, AH1-408

AG2-262, AG2-522, AG2-659

Dominionn7698 / dom-394

Rebuild 4.29 miles of 115 kV line 65 from AD2-074 Tap to AG1-135 Tap with single (1) 768.2 ACSS/TW (20/7) "Maumee" conductor.

43 to 44 Months
$20,146,983

AG2-005, AG2-366

Dominionn7796 / dom-302/3

Wreck and rebuild 14.01 miles of 230 kV Line 2027 between Midlothian and Powhatan with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

42 to 48 Months
$53,238,000

AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominionn7827 / dom-454

Wreck and rebuild 4.88 miles of 115 kV Line 154 between Madisonville DP and Pamplin with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

30 to 36 Months
$17,958,400

AG2-440, AG2-441, AG2-442, AH1-215

Dominionn8238 / dom-294

Wreck and rebuild 1.41 miles of 230 kV Line 217 between Charles City Road and Varina with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$5,358,000

AG2-093, AG2-428, AG2-436, AG2-570, AG2-571, AH1-528

Dominionn8239 / dom-300

Wreck and rebuild 8.84 miles of 230 kV Line 217 between Chesterfield and Varina with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

36 to 42 Months
$33,592,000

AG2-093, AG2-428, AG2-436, AG2-570, AG2-571, AH1-528

Dominionn8243 / dom-389

Wreck and rebuild 5.8 miles of 230 kV Line 2027 between AC2-165 (Sallee Creek) and Powhatan with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

36 to 42 Months
$22,040,000

AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominionn8256 / dom-277

Wreck and rebuild 5.9 miles of 230 kV Line 2027 (future Line 2323) between Cartersville and AC2-165 (Sallee Creek) with (2) 768.2 ACSS/TW (20/7) "MAUMEE".

36 to 42 Months
$22,420,000

AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominionn8296 / dom-266

Add a 2nd new 224 MVA 115/230 kV Transformer at Fork Union substation and add one (1) 115 kV breaker and one (1) 230 kV breaker

42 to 48 Months
$17,500,000

AG2-151, AG2-188, AG2-198, AG2-440, AG2-441, AG2-442, AG2-566, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-546, AH1-687

AG2-077, AH1-170

Dominionn8423 / dom-119

Wreck and rebuild 0.06 miles of 115 kV line 1016 between Woodchuck Trail and Crystal Hill DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C.

30 to 36 Months
$192,000

AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343

Dominionn9112.0 / TC1-PH2-DOM-063

Wreck and Rebuild 12.4 miles of 230 kV line 259 with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Chesterfield.

46 to 47 Months
$87,030,447

AG2-088, AG2-093, AG2-270, AG2-428, AG2-436, AH1-528

Dominionn9132.0 / dom-122

Add 3rd 138/115 kV transformer at Altavista substation

42 to 44 Months
$11,000,000

AG2-111, AG2-112, AG2-311, AH1-343

AG2-077

Dominionn9136.0 / TC1-PH1-DOM-066

Wreck and rebuild 1.32 miles of 115 kV line from Garner to AG1-135 with 768.2 aluminum conductor steel supported trapezoidal shaped aluminum strands ("ACSS/TW") (20/7). Replace line lead at Garner DP.

42 to 43 Months
$8,145,385

AG2-005, AG2-215, AG2-366

Dominionn9138.0 / TC1-PH1-DOM-070

Wreck and rebuild 22.59 miles of Line #511 between Carson and Rawlings Substations with three (3) 1351 ACSS/TW and associated substation work.

60 to 61 Months
$111,130,292

AG2-069, AG2-077, AG2-339, AG2-436, AG2-570, AG2-581, AH1-528

Dominionn9139.0 / TC1-PH1-DOM-073

Wreck and rebuild 37.41 miles of 500kV line 563 between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" and associated substation work.

69 to 70 Months
$245,455,768

AG2-436, AH1-528, AH1-712, AH1-716, AH1-723

Dominionn9145.0 / TC1-PH1-DOM-008

Reconductor 0.11 miles of 115 kV line between Garner DP and Moon Corner with single (1) 768.2 aluminum conductor steel supported trapezoidal shaped aluminum strands ("ACSS/TW") (20/7).

18 to 19 Months
$2,096,619

AG2-005, AG2-215, AG2-366

Dominionn9146.0 / TC1-PH1-DOM-004

Wreck and rebuild 1.51 miles of 115 kV Line No. 5 between Bremo and Fork Union with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees Celsius. Replace line lead at Bremo.

42 to 43 Months
$7,535,533

AG2-077, AG2-151, AG2-188, AG2-198, AG2-583, AH1-056, AH1-170, AH1-241, AH1-439, AH1-546, AH1-687

Dominionn9147.0 / TC1-PH1-DOM-011

Wreck and rebuild 1.05 miles of 115 kV Line 153 between Locust Grove DP and Pine Glade with (1) 768.2 ACSS/TW (20/7) "MAUMEE".

30 to 36 Months
$3,360,000

AH1-676

Dominionn9148.0 / TC1-PH1-DOM-013-TC2

Wreck and rebuild 5.63 miles of 115 kV line between Wan and White Marsh with (1) 768.2 ACSS/TW (20/7) ""MAUMEE"" conductor @ 250 degrees C.

43 to 44 Months
$37,993,385

AG2-005, AG2-366

Dominionn9150.0 / TC1-PH1-DOM-022

Wreck and Rebuild 0.62 miles of 115 kV line 153 between Oak Green and Unionville Tap with (1) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C.

30 to 36 Months
$1,984,000

AH1-676

Dominionn9151.0 / TC1-PH1-DOM-026

Rebuild 0.76 miles of 115 kV line 93 between Southampton and Watkins Corner with single (1) 768.2 ACSS/TW (20/7) "Maumee" conductor. Replace line lead at Watkins Corner.

42 to 43 Months
$4,174,356

AG2-522, AH1-408

Dominionn9153.0 / TC1-PH1-DOM-043

Wreck and rebuild 5.9 miles of 230 kV line 2128 between Fentress and Thrasher with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Fentress.

43 to 44 Months
$33,297,247

AH1-040

Dominionn9154.0 / TC1-PH1-DOM-025

Replace switch 9369 at Watkins Corner 115 kV (Watkins Corner - Southampton).

26 to 27 Months
$343,523

AG2-522, AH1-408

Dominionn9191.0 / TC1-PH1-DOM-090

Rebuild 41.13 miles of line 576 between North Anna and Midlothian with triple bundled (3) 1351.5 ACSR (45/7) "Dipper" conductor and associated substation work.

74 to 75 Months
$256,706,175

AG2-088, AG2-436, AH1-528, AH1-712, AH1-716, AH1-723

Dominionn9197.0 / TC1-PH2-DOM-001

Wreck and rebuild 4.97 miles of 115 kV Line 153 between Locust Grove DP and Unionville Tap with (1) 768.2 ACSS/TW (20/7) "MAUMEE".

30 to 36 Months
$15,904,000

AH1-676

Dominionn9198.0 / TC1-PH2-DOM-003-TC2

Replace Circuit Breaker 219322 and Circuit Breaker Lead at Bremo 230 kV (Bremo - Fork Union).

40 to 41 Months
$2,113,879

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687

Dominionn9199.0 / TC1-PH2-DOM-004

Wreck and rebuild 1.63 miles of line 2193 between Fork Union and Bremo with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C and replace line lead at Bremo.

42 to 43 Months
$7,947,612

AG2-088, AG2-188, AG2-198, AG2-270, AG2-436, AG2-440, AG2-441, AG2-442, AG2-583, AH1-056, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominionn9200.0 / TC1-PH2-DOM-005

Rebuild 11.79 miles of line 238 between Sapony and Carson with twin bundled (2) 768.2 ACSS/TW (20/7) "Maumee" conductors.

45 to 46 Months
$38,691,326

AG2-077, AG2-270, AG2-522, AH1-408, AH1-528

Dominionn9201.0 / TC1-PH2-DOM-006

Replace wave trap at Carson 230 kV (Carson - Sapony).

14 to 15 Months
$521,941

AG2-077, AG2-270, AG2-522, AH1-408, AH1-528

Dominionn9202.0 / TC1-PH2-DOM-007

Replace Line Switch 23886 at Sapony 230 kV (Carson - Sapony).

12 to 18 Months
$400,000

AG2-077, AG2-270, AG2-382, AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-040, AH1-271, AH1-408, AH1-528

Dominionn9203.0 / TC1-PH2-DOM-008-TC2

Wreck and rebuild 10.74 miles of line 2028 between Fork Union and Cunningham (Grape Vine) with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C.

45 to 46 Months
$29,539,973

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominionn9204.0 / TC1-PH2-DOM-014

Wreck and rebuild 1.63 miles of line 238 between AE2-033 tap and Sapony with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor.

42 to 43 Months
$6,764,273

AG2-077, AG2-270, AG2-522, AH1-408, AH1-528

Dominionn9205.0 / TC1-PH2-DOM-015

Replace Line Switch 23889 at Sapony 230 kV (Sapony - AE2-033 Tap)

12 to 18 Months
$400,000

AG2-077, AG2-270, AG2-382, AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-040, AH1-271, AH1-408, AH1-528

Dominionn9208.0 / TC1-PH2-DOM-020

Wreck and rebuild 6.87 miles of 115 kV Line 136 from Earleys to Ahoskie with single (1) 768.2 ACSS/TW (20/7) "Maumee" conductor. Replace line lead at Ahoskie.

43 to 44 Months
$25,503,905

AH1-091

Dominionn9215.0 / TC1-PH2-DOM-026

Replace the Line Switch 9366 at Watkins 115 kV substation (Watkins - Franklin).

12 to 18 Months
$300,000

AG2-522, AG2-659, AH1-408

Dominionn9217.0 / TC1-PH2-DOM-028

Wreck and rebuild 12.73 miles of 230 kV Line 298 from Buckingham to Farmville Substations with twin bundled (2) 768 ACSS/TW (20/7) "MAUMEE" conductor.

45 to 46 Months
$40,414,822

AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-436, AG2-440, AG2-441, AG2-442, AG2-581, AH1-056, AH1-377, AH1-439, AH1-528

Dominionn9220.0 / TC1-PH2-DOM-033

Wreck and rebuild 15.42 miles of 230 kV Line #298 from Buckingham to Bremo Substations with twin bundled (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor.

42 to 48 Months
$44,465,922

AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-436, AG2-440, AG2-441, AG2-442, AG2-581, AH1-056, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546

Dominionn9221.0 / TC1-PH3-DOM-015-TC2

Replace 230 kV Breaker 29822 at Bremo with a higher-rated device (Buckingham - Bremo).

38 to 39 Months
$2,057,335

AG2-068, AG2-069, AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546

Dominionn9222.0 / TC1-PH2-DOM-036-TC2

Wreck and Rebuild 6.95 miles of 115 kV Line 89 from White Marsh to Hayes with (1) 768 ACSS/TW (20/7) ""Maumee"" conductor @ 250 degrees C. Replace Line Lead at Hayes.

43 to 44 Months
$42,356,870

AG2-005, AG2-366

Dominionn9248.0 / TC1-PH2-DOM-042

Construct new 41.13 mile line between North Anna and Midlothian with (3) 1351.5 ACSS TW/HS285 (42/19) "MARTIN" at 145 degrees C. Station upgrades at North Anna and Midlothian to accommodate new line.

48 to 60 Months
$345,766,000

AG2-088, AG2-338, AG2-339, AG2-428, AG2-436, AG2-570, AG2-571, AH1-528, AH1-681, AH1-712, AH1-716, AH1-723

Dominionn9249.0 / TC1-PH2-DOM-043

Construct new 37.26 mile line between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Midlothian and Carson to accommodate new line.

48 to 60 Months
$231,012,000

AG2-068, AG2-069, AG2-077, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-570, AG2-571, AG2-581, AH1-528, AH1-681, AH1-712, AH1-716, AH1-723

Dominionn9250.0 / TC1-PH2-DOM-044

Construct a new 22.59 mile line between Carson and Rawlings Substations.

60 to 61 Months
$108,728,086

AG2-069, AG2-077, AG2-339, AG2-436, AG2-570, AG2-581, AH1-528

Dominionn9252.0 / TC1-PH2-DOM-047

Rebuild 3.81 miles of Line 2021 between Elizabeth City and Shawboro with double bundled (2) 768.2 ACSS/TW (20/7) "Maumee" conductor.

15 to 16 Months
$12,801,638

AG2-382, AH1-040, AH1-271

Dominionn9256.0 / TC1-PH2-DOM-049

Re-conductor 5.8 mi of 230 kV underground cable 2119 from Garrisonville to Aquia Harbor with 2-5000 kcmil CU.

36 to 42 Months
$116,000,000

AG2-428, AG2-469, AH1-042, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694

Dominionn9261.0 / TC1-PH2-DOM-060

Replace Existing Chickahominy XFRM 1 with 3-480 MVA Single Phase XFRM.

42 to 48 Months
$40,000,000

AG2-010, AG2-428, AG2-436, AG2-570, AG2-571, AG2-646, AH1-040, AH1-042, AH1-157, AH1-216, AH1-528, AH1-717

Dominionn9264.0 / TC1-PH1-DOM-080

Replace Line Lead at Surry for increased rating on Line 567 8SURRY 500 KV to 8CHCKAHM 500 KV ckt 1.

12 to 13 Months
$582,006

AG2-428, AG2-436, AH1-528, AH1-716

Dominionn9265.0 / TC1-PH2-DOM-064

Replace 230 kV wave trap 259WT at Basin 230 kV (Basin - Chesterfield B).

14 to 15 Months
$396,021

AG2-088, AG2-093, AG2-270, AG2-428, AG2-436, AH1-528

Dominionn9266.0 / TC1-PH2-DOM-065

Replace switches 25944 and 25945 at Basin 230 kV (Basin - Chesterfield B).

38 to 39 Months
$701,120

AG2-093, AG2-428, AG2-436, AH1-528

Dominionn9305.0 / TC1-PH2-DOM-037

Replace existing 115/230 kV Transformers #4 and #5 and add two additional 115/230 kV transformers at Farmville Substation. Farmville Substation will be reconfigured as a breaker and a half.

42 to 48 Months
$121,800,000

AG2-171, AG2-213, AG2-341, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215, AH1-280, AH1-408

AG2-522, AG2-566, AG2-659

Dominionn9376.0 / TC1-PH3-DOM-003-TC2

Wreck and Rebuild 22.98 miles of 230 kV Line 235 from Briery to AG1-098 with (2) 768.2 ACSS/TW (20/7) ""MAUMEE"" at 250 C.

Dec 31 2029
$69,323,785

AG2-077, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-215, AH1-217, AH1-241, AH1-280, AH1-377, AH1-439, AH1-528, AH1-546, AH1-676, AH1-687

Dominionn9378.0 / TC1-PH3-DOM-010

Replace existing 230/500 kV Carson transformer 2 with (4)-480 MVA single phase transformers.

Dec 31 2029
$37,801,301

AG2-069, AG2-077, AG2-270, AG2-339, AG2-436, AG2-570, AG2-581, AH1-528

Dominionn9379.0 / TC1-PH3-DOM-011

Replace existing 230/500 kV Transformer 1 at Midlothian with (4)-480 MVA Single Phase transformers.

Dec 31 2029
$37,836,293

AG2-088, AG2-339, AG2-428, AG2-436, AG2-583, AH1-528

Dominionn9380.0 / TC1-PH3-DOM-012

Replace existing Ladysmith 230/500 kV transformer 1 with four (4) 480 MVA single phase transformers.

Dec 31 2029
$37,587,605

AG2-208, AG2-320, AH1-683, AH1-691, AH1-692

Dominionn9643.0 / TC1-PH3-DOM-009-TC2

Replace 795 AAC 37 line lead at Farmville 115 kV.

Mar 31 2027
$391,643

AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215

Dominionn9644.0 / TC1-PH3-DOM-006-TC2

Upgrade a 2.73 mile segment of 230kV transmission line 2028 between Mt. Eagle and Grape Vine. This segment runs from Grape Vine substation to structure 2080/73.

Mar 31 2029
$8,415,380

AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687

Dominionn9651.0 / TC1-PH2-DOM-009

Wreck and rebuild 10.05 miles of 115 kV Line 1059 between Northern Neck and Moon Corner with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C.

Mar 31 2029
$28,476,954

AG2-005, AG2-124, AG2-215, AG2-366

Dominionn9652.0 / TC1-PH2-DOM-010

Replace Wave Trap at Northern Neck for increased rating of Line 1059 between Northern Neck and Moon Corner

Mar 01 2027
$1,065,776

AG2-005, AG2-124, AG2-215, AG2-366

Dominionn9653.0 / TC1-PH2-DOM-011

Replace Line Switch at Northern Neck for increased rating of Line 1059 between Northern Neck and Moon Corner

Mar 01 2027
$454,326

AG2-005, AG2-215, AG2-366

Dominionn9677.0 / dom-429

Wreck and rebuild 0.95 miles of 115 kV Line 65 between Rappahannock and White Stone with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C

30 to 36 Months
$3,496,000

AG2-005, AG2-366

Dominions2705

Wreck and rebuild approximately 12 miles of double circuit 230kV Line #252 and 115kV Line #29 from Aquia Harbour Switching Station to Possum Point. Upgrade station equipment.

Sep 25 2029
Contingent

AG2-320, AG2-436, AG2-469, AH1-042, AH1-528

EKPC(Pending) / EKPC-tc-nu043

AE2-254 POI (South Lancaster Substation)-Garrard County 69 kV Jumper Replacement #2

12 to 15 Months
$150,000

AG2-179, AH1-427, AH1-721

EKPC(Pending) / EKPC-tc1-r0021a

Rebuild the AE2-254 POI (South Lancaster)-Garrard County 69 kV line (1.81 miles) using 954 MCM ACSR conductor.

12 to 15 Months
$2,085,000

AG2-179, AH1-427, AH1-721

EKPC(Pending) / EKPC-tc2-nu001

Albany-Upchurch Tap 69 kV Line Section Rebuild (3.79 miles)

12 to 20 Months
$6,035,000

AH1-239

EKPC(Pending) / EKPC-tc2-nu002

Albany-Upchurch Tap 69 kV Jumper Replacement

9 to 15 Months
$105,000

AH1-239

EKPC(Pending) / EKPC-tc2-nu003

Cooper CCGT-Alcalde 161 kV Double-Circuit Line Addition

22 to 36 Months
$15,730,000

AG2-179, AG2-298, AG2-424, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721

EKPC(Pending) / EKPC-tc2-nu004

Broughtontown Tap-Highland 69 kV Line Section Rebuild (3.70 miles)

12 to 20 Months
$6,480,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu005

Broughtontown Tap-Tommy Gooch 69 kV Line Section Rebuild (2.60 miles)

12 to 17 Months
$4,555,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu006

Broughtontown Tap-Tommy Gooch 69 kV Line Disconnect Upgrade

12 to 20 Months
$220,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu007

Charters-Rectorville 69 kV Line Conductor Temperature Upgrade (11.5 miles)

12 to 21 Months
$650,000

AH1-664, AH1-665

EKPC(Pending) / EKPC-tc2-nu008

Cooper 161/69 kV Transformer Upgrade

27 to 45 Months
$6,700,000

AH1-721

EKPC(Pending) / EKPC-tc2-nu009

Crooksville Tap (Madison County)-Crooksville 69 kV Line Rebuild

15 to 22 Months
$7,480,000

AG2-073

EKPC(Pending) / EKPC-tc2-nu010

Summer Shade-Edmonton Industrial/JB Galloway Tap 69 kV Line Section Rebuild

20 to 30 Months
$12,425,000

AH1-034

EKPC(Pending) / EKPC-tc2-nu011

Fox Hollow-Patton Road Junction 69 kV Line Rebuild

13 to 20 Months
$5,795,000

AG2-179, AG2-424, AG2-670, AH1-034, AH1-239, AH1-721

EKPC(Pending) / EKPC-tc2-nu012

Highland-Mount Olive Junction 69 kV Line Rebuild (10.91 miles)

21 to 34 Months
$19,105,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu013

Highland-Mount Olive Junction 69 kV Line Disconnect Switch Upgrade

12 to 20 Months
$220,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu014

Green County-Summersville 69 kV Line Section Rebuild #2 (266.8 MCM ACSR section)

12 to 18 Months
$265,000

AG2-424

EKPC(Pending) / EKPC-tc2-nu016

Laurel County 161/69 kV Transformer CT Upgrade

12 to 15 Months
$35,000

AH1-721

EKPC(Pending) / EKPC-tc2-nu017

Liberty Junction-Mount Olive Junction 69 kV Line Section Rebuild (3.26 miles)

12 to 19 Months
$5,710,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu018

Liberty Junction-Mount Olive Junction 69 kV Jumper Replacement

9 to 15 Months
$105,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu019

Liberty Junction-Mount Olive Junction 69 kV Line Disconnect Switch Upgrade

12 to 20 Months
$220,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu020

Liberty Junction-Mount Olive Junction 69 kV Breaker CT Setting Upgrade

9 to 12 Months
$10,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu021

Loretto-AG2-298 Tap (West Marion County) 69 kV Line Conductor Temperature Upgrade (0.6 miles)

12 to 15 Months
$35,000

AG2-298, AG2-424

EKPC(Pending) / EKPC-tc2-nu022

Patton Road Junction-AH1-034 Tap (East Barren County) 69 kV Line Section Rebuild (4.7 miles)

15 to 23 Months
$8,965,000

AG2-179, AH1-034, AH1-239, AH1-721

EKPC(Pending) / EKPC-tc2-nu023

Patton Road Junction-AH1-034 Tap (East Barren County) 69 kV Line Disconnect Switch Upgrade

12 to 20 Months
$220,000

AH1-034

EKPC(Pending) / EKPC-tc2-nu024

Plumville-Rectorville 69 kV Line Conductor Temperature Upgrade (2.9 miles)

12 to 16 Months
$180,000

AH1-664, AH1-665

EKPC(Pending) / EKPC-tc2-nu025

Salem Tap-Webbs Crossroads Tap 69 kV Line Section Rebuild (2.7 miles)

12 to 17 Months
$4,300,000

AG2-179, AH1-034

EKPC(Pending) / EKPC-tc2-nu026

Salem Tap-Windsor 69 kV Line Section Rebuild (5.31 miles)

17 to 24 Months
$8,455,000

AG2-179

AH1-034

EKPC(Pending) / EKPC-tc2-nu027

Sulphur Creek-AG2-298 Tap (West Marion County) 69 kV Line Section Rebuild (9.14 miles)

22 to 31 Months
$14,555,000

AG2-298

EKPC(Pending) / EKPC-tc2-nu028

Summer Shade-Summer Shade Junction 69 kV Line Section Rebuild (0.15 miles)

12 to 16 Months
$260,000

AH1-034

EKPC(Pending) / EKPC-tc2-nu029

Tommy Gooch Tap-AH1-427 Tap (North Lincoln County) 69 kV Line Section Rebuild (2.25 miles)

12 to 16 Months
$4,335,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu030

Tommy Gooch Tap-AH1-427 Tap 69 kV Line Disconnect Switch Upgrade

12 to 20 Months
$220,000

AH1-427

EKPC(Pending) / EKPC-tc2-nu031

Upchurch Tap-AH1-239 Tap (Clinton County) 69 kV Line Section Rebuild (1.5 miles)

12 to 18 Months
$2,390,000

AH1-239, AH1-721

EKPC(Pending) / EKPC-tc2-nu032

Wayne County-Zula Junction N.O. 69 kV Line Section Rebuild (0.78 miles)

12 to 18 Months
$1,245,000

AH1-034, AH1-239

EKPC(Pending) / EKPC-tc2-nu033

Wayne County-Zula Junction N.O. 69 kV Jumper Replacement

9 to 15 Months
$105,000

AH1-034, AH1-239

EKPC(Pending) / EKPC-tc2-nu034

Zula Junction N.O.-AG1-471 (Massingale Road) 69 kV Line Section Rebuild (0.6 miles)

12 to 18 Months
$960,000

AH1-034, AH1-239

EKPC(Pending) / EKPC-tc2-nu036

AE2-071 Tap (Eighty Eight Substation)-Summer Shade Junction 69 kV Line Disconnect Switch Upgrade

12 to 20 Months
$220,000

AH1-034

EKPC(Pending) / EKPC-tc2-nu037

AE2-071 Tap (Eighty Eight)-Summer Shade Junction 69 kV Line Section Rebuild (1.7 miles) with 954 ACSR Conductor

12 to 15 Months
$3,130,000

AH1-034

EKPC(Pending) / EKPC-tc2-nu038

AE2-071 Tap (Eighty Eight Substation)-Summer Shade Junction 69 kV Zone 3 Relay Setting Increase

9 to 12 Months
$10,000

AH1-034

EKPC(Pending) / EKPC-tc2-nu040

AE2-071 Tap (Eighty Eight)-AH1-034 Tap (East Barren County) 69 kV Line Section Rebuild (5.9 miles) with 795 ACSR Conductor

15 to 22 Months
$9,870,000

AH1-034

EKPC(Pending) / EKPC-tc2-nu041

AE2-254 POI (South Lancaster Substation)-Garrard County 69 kV Breaker CT Upgrade

12 to 15 Months
$100,000

AG2-179, AH1-427, AH1-721

EKPC(Pending) / EKPC-tc2-nu042

AE2-254 POI (South Lancaster Substation)-Garrard County 69 kV Jumper Replacement

9 to 15 Months
$105,000

AG2-179, AH1-427, AH1-721

EKPC(Pending) / EKPC-tc2-nu044

Rebuild the AE2-254 POI (South Lancaster)-AH1-427 Tap (North Lincoln County) 69 kV line (3.34 miles) using 795 MCM ACSR conductor.

16 to 20 Months
$3,465,000

AG2-179, AH1-427, AH1-721

EKPC(Pending) / EKPC-tc2-nu045

Rebuild the AF1-038 Tap (North Russell County)-Webbs Crossroads Tap 69 kV line (1.6 miles) using 556.5 MCM ACSR conductor.

12 to 15 Months
$1,495,000

AG2-179, AH1-034

EKPC(Pending) / EKPC-tc2-nu046

Rebuild the AG1-471 Tap (Massingale Road)-AH1-239 Tap 69 kV line (Clinton County) (4.5 miles) using 556.5 MCM ACSR conductor.

20 to 25 Months
$4,215,000

AH1-239

EKPC(Pending) / EKPC-tc2-nu901

Green County-Greensburg KU 69 kV Line Section EKPC Limit

1 Months
$0

AG2-424, AG2-670

EKPC(Pending) / r0067

Replace the 500 MCM copper bus and jumpers at the Summer Shade substation using 750 MCM copper or equivalent

12 to 15 Months
$125,000

AH1-034

EKPCn6232.1 / EKPC-tc1-r0003b

Replace the 1200A interconnection metering CTs with 1600A equipment.

12 to 15 Months
$345,000

AG2-179, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721

EKPCn6460.3

Rebuild the EKPC portion of the Longbranch-Mt. Zion 138 kV line section using 954 MCM ACSS conductor (3.7 miles).

14 to 24 Months
$7,400,000

AG2-073, AG2-081, AG2-159, AH1-004, AH1-664, AH1-665, AH1-666, AH1-721

AH1-427

EKPCn6463.2 / EKPC-tc1-r0007b

Upgrade jumpers associated with Boone 138 kV bus using 2-500 MCM 37 CU conductor or equivalent

Jun 01 2022
Contingent

AG2-073, AG2-159, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721

EKPCn6463.3 / EKPC-tc1-r0007a

Replace the 954 MCM ACSR line conductor in the Boone County-Longbranch 138 kV line with 795 MCM ACSS conductor (2.3 miles)

11 to 19 Months
$5,400,000

AG2-073, AG2-081, AG2-159, AH1-004, AH1-664, AH1-665, AH1-666, AH1-721

AH1-427

EKPCn6480.1 / EKPC-tc1-r0002a

Rebuild the Plumville-Murphysville 69 kV line section using 556 MCM ACSR conductor at 212 degrees F (9.9 miles)

22 to 34 Months
$15,610,000

AH1-664, AH1-665, AH1-666

EKPCn6833.1 / EKPC-tc1-r0011a

Increase the maximum operating temperature of the 636 MCM ACSR conductor in the Casey County-Liberty Junction 161 kV line section to 176 degrees F.

12 to 18 Months
$1,155,000

AH1-721

AG2-179, AH1-239

EKPCn6834.1 / EKPC-tc1-r0001a

Rebuild the 4/0 ACSR Green County-Summersville 69 kV line section (4.2 miles) using 556 MCM ACSR.

18 to 24 Months
$5,585,000

AG2-424, AG2-670, AH1-721

AH1-034

EKPCn7771.1 / r0013

Increase the maximum operating temperature of the Laurel County-Laurel Dam 161 kV line section 795 MCM conductor to 167 degrees F (~0.2 miles)

6 Months
$35,000

AG2-179, AH1-239, AH1-721

AG2-670, AH1-034

EKPCn7771.2 / EKPC-tc1-r0014a

Increase the maximum operating temperature of the Laurel County-Laurel Dam 161 kV line section 795 MCM conductor to 212 degrees F (~4.47 miles)

12 to 15 Months
$515,000

AG2-179, AH1-239, AH1-721

AG2-670, AH1-034

EKPCn7788.1 / r0071

Rebuild the AE2-071-Summer Shade 69 kV line section using 795 MCM ACSR conductor at 212 degrees F (1.7 miles)

8 to 12 Months
$2,708,000

AH1-034

EKPCn8356 / r0050

Increase the maximum operating temperature of the 4/0 ACSR conductor in the Patton Road Junction-Roseville Tap 69 kV line section to 212 degrees F (2.2 miles)

10 Months
$150,000

AH1-034

EKPCn8364.1 / EKPC-tc1-r0009b

Replace the 636 MCM ACSR conductor in the Marion County-KU Lebanon 138 kV line with 954 MCM ACSS conductor.

21 to 27 Months
$200,000

AG2-179, AG2-670, AH1-034, AH1-239, AH1-721

AG2-424

EKPCn8368.2 / EKPC-tc1-r0012b

Rebuild the Cooper-Elihu 161 kV line section using 1272 MCM ACSS conductor (4.2 miles)

16 to 27 Months
$10,335,000

AG2-179, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721

EKPCn8368.3 / EKPC-tc1-r0012c

Change the Zone 3 relay setting at Elihu substation associated with the line protection to at least 383 MVA LTE rating.

9 to 12 Months
$10,000

AG2-179, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721

EKPCn8368.4 / EKPC-tc1-r0012d

Upgrade the existing 795 MCM ACSR jumpers at the Cooper substation associated with the Cooper-Elihu 161 kV line using bundled 500 MCM CU or equivalent

9 to 12 Months
$35,000

AG2-179, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721

EKPCn8369 / EKPC-tc1-r0015a

Replace the existing Marion County 161/138 kV, 200 MVA transformer with a 300 MVA transformer.

36 to 42 Months
$8,825,000

AG2-179, AG2-670, AH1-034, AH1-239, AH1-721

AG2-424

EKPCn9128.0 / EKPC-tc1-r0005c

Upgrade the 300A metering CTs at North Springfield with 800A metering CTs.

12 to 15 Months
$370,000

AG2-424, AG2-670, AH1-721

EKPCn9668.0 / r0004

Increase the maximum operating temperature of the Summershade-Edm. JB Galloway Jct 69kV line section 266 MCM conductor to 212F (7.88 miles)

12 to 15 Months
$420,000

AH1-034, AH1-239

EKPCn9673.0 / EKPC-tc1-r0020b

Replace the 1500A interconnection metering CTs at Spurlock Station with 2000A equipment.

18 to 21 Months
$1,295,000

AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721

EKPCn9678.0 / EKPC-r0114a

Increase the maximum operating temperature of the 266 MCM ACSR conductor in the McKinney Corner Tap-Knob Lick 69 kV line section to 212 degrees F (12.53 miles)

24 Months
$720,000

AH1-034

EKPCs3165.0 / s3165

Construct a new 161/13.8 kV distribution substation and associated 0.25 mile 161 kV double circuit tap line.

Jul 26 2024
Contingent

AH1-721

EKPCs3169.0 / EKPC-tc1-r0005b

Rebuild the EKPC portion of the North Springfield-KU Springfield 69 kV line (2.6 mile) using 556 MCM ACSR conductor - Projected In-Service Date 6/1/2025

TBD
Contingent

AG2-424, AG2-670, AH1-427, AH1-721

EKPCs3169.0 / s3169

Rebuild the 14.11 mile, North Springfield-Loretto 69 kV line using 556.5 conductor and steel pole construction

TBD
Contingent

AG2-298, AG2-424

EKPCs3170.0 / s3170

Rebuild the 4.4 mile, Snow Tap-North Albany 69 kV line using 556.5 conductor and steel pole construction.

Jun 01 2026
Contingent

AH1-239

EKPCs3173.0 / S3173

Rebuild the 16.3 mile, Duncannon Lane Tap-West Berea 69 KV line

Jul 12 2027
Contingent

AG2-073

LS Powerb3737.37

Silver Run-Hope Creek 230kV Expansion (Projected ISD 6/1/2029)

Jun 01 2029
Contingent

AH1-260, AH1-710

ME(Pending) / TC2-ME-001

Rebuild 12.09 mi of the TMI – AE2-211_Tap 230 kV Line

50 Months
$62,051,618

AH1-695

ME(Pending) / TC2-ME-002

Rebuild 5.95 mi of AE2-211_Tap - Jackson 230 kV Line

32 Months
$29,829,326

AH1-695

OVECb3788.2 / B3788.2

Replace limiting station elements at Kyger Creek

Jun 01 2028
Contingent

AG2-072, AG2-219, AG2-363, AG2-453, AH1-055, AH1-537, AH1-721

PECO(Pending) / 220-97 Upgrades

Reinforcement for LINWOOD97 230 KV to POST97 230 KV ckt 1

48 Months
$19,750,000

AG2-347, AH1-584, AH1-585, AH1-586, AH1-634

PECO(Pending) / Chichester1

Chichester substation reinforcement

24 to 36 Months
$750,000

AG2-347, AH1-584, AH1-585, AH1-586, AH1-634

PECOb3737.23

Rebuild the underground portion of Richmond-Waneeta 230 kV (Projected ISD 6/1/2029)

Jun 01 2029
Contingent

AG2-347, AH1-710

PECOb3737.47

Build New North Delta 500 kV substation (Four bay breaker and half configuration)

Oct 15 2027
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3737.50

Bring the Peach Bottom-Delta Power Plant 500 kV line “in and out” of North Delta

Jun 01 2029
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3780.1

Peach Bottom North upgrades – substation work (Projected ISD 12/31/2028)

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3780.14

Reconfigure Cooper transmission feeds by establishing new Cooper-North Delta 230 kV line and rerouting existing transmissions lines by Cooper.

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3780.15

Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3780.16

Terminate new Cooper-North Delta 230 kV line (Transource Scope) at North Delta 230 kV

Oct 15 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3780.17

Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub (Transource)

May 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3780.2

Peach Bottom to Graceton (PECO Portion) – New 500kV Line

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.31

Build new North Delta-High Ridge 500 kV line - PECO Portion (Projected ISD 12/1/2030)

Dec 01 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.35

Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV (Projected ISD 12/1/2030)

Dec 01 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.42

Peach Bottom 500kV North bus upgrade (Projected ISD 12/1/2030)

Dec 01 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.44

North Delta termination for the North Delta-High Ridge 500 line (PECO work).

Dec 01 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.45

North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (PECO work).

Dec 01 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.47

Build new Peach Bottom South-North Delta 500 kV line (Projected ISD 12/1/2030)

Dec 01 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.48

North Delta termination for the North Delta-High Ridge 500 line (Transource work).

Dec 15 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.49

North Delta 500 kV termination for the Calpine generator (Calpine/Transource work).

Oct 06 2027
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.50

North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (Transource work).

Jan 23 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.51

North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (Transource work).

May 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3800.52

Reconfigure Peach Bottom North and South 500 kV yards (Projected ISD 12/1/2030)

Dec 01 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PECOb3907.2

Rebuild Richmond - Waneeta 230 kV line

Jun 01 2029
Contingent

AG2-347, AH1-710

PECOb3907.3

Reconductor 2.12 miles of North Philadelphia to Waneeta 230 kV line including terminal equipment

Jun 01 2029
Contingent

AH1-710

PECOn6471 / pe002

Replace 1 piece of station cable in Richmond substation on Richmond-Camden tie line

24 Months
$45,000

AG2-347, AG2-616, AH1-584, AH1-585, AH1-586, AH1-634, AH1-641, AH1-710

PECOn6473 / pe003

Replace reactor in Richmond substation on Richmond-Camden tie line

36 Months
$2,254,000

AG2-347, AG2-616, AH1-584, AH1-585, AH1-586, AH1-634, AH1-641, AH1-710

PECOn6474 / pe004

Replace 2 circuit breakers in Richmond substation on Richmond-Camden tie line

36 Months
$752,000

AG2-347, AG2-616, AH1-584, AH1-585, AH1-586, AH1-634, AH1-641, AH1-710

PECOn7159 / pe023

Reconductor 2 miles of 230 kV line from Chichester to Trainer with 2x1590 kcmil 54/19 ACSR and substation work at Chichester and Trainer.

Oct 31 2026
$11,900,000

AG2-347, AH1-584, AH1-585, AH1-586, AH1-634

PECOn7163 / pe022

Rebuild 0.82 miles of 230 kV line from Trainer to Delco Tap with bundled 1590 kcmil 54/19 ACSR

16 Months
$4,000,000

AG2-347, AH1-584, AH1-585, AH1-586, AH1-634

PECOn7195 / pe025

Rebuild 1.55 miles of 230 kV line from Linwood to Claymont with 2x1590 kcmil 54/19 ACSR

36 Months
$4,500,000

AG2-281, AG2-347, AH1-584, AH1-585, AH1-586, AH1-634, AH1-672, AH1-710

PECOn7866 / pe042

Reconductor Linwood - Chichester 230 kV line. At Chichester: Upgrade #43 reactor.

Oct 31 2026
$5,250,000

AG2-347, AH1-584, AH1-585, AH1-586, AH1-634

PECOn9371.0 / PECO 220-85

Install OPGW on PECO portion of EDGEMR 5 230.0 kV to LINWOOD85 230.0 kV ckt 1

36 to 60 Months
$232,164

AG2-347

PENELEC(Pending) / PN-AF2-F-0017C

Replace line trap at Lewistown

17 Months
$364,562

AH1-313, AH1-588, AH1-589

PENELEC(Pending) / PN-AF2-F-0039B

Rebuild 4.67 miles of the Penn Mar - High Point 115 kV Line.

20 Months
$17,358,473

AG2-411, AH1-201, AH1-203, AH1-205, AH1-460, AH1-588, AH1-589

PENELEC(Pending) / PN-AG1-F-0011

Reconductor 2.23 miles of the Farmers Valley-Piercebrook 115kV line

19 Months
$8,857,754

AH1-587

PENELEC(Pending) / TC2-PN-001.a

Replace 230 kV bus conductor at Shawville

13 Months
$696,930

AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

PENELEC(Pending) / TC2-PN-001.b

Reconductor (Possible Rebuild) ~21.2 miles of Shawville-Shingletown 230kV transmission line. [PN side]

73 Months
$107,340,814

AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

PENELEC(Pending) / TC2-PN-003.c

Replace substation conductor at Glade substation

13 Months
$752,332

AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

PENELEC(Pending) / TC2-PN-005.a

Replace Sub conductor at Shelocta Substation (Homer City-Shelocta 230kV line terminal)

13 Months
$869,783

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELEC(Pending) / TC2-PN-005.b

Adjust Relays at Shelocta Substation (Homer City-Shelocta 230kV line terminal)

12 Months
$52,848

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELEC(Pending) / TC2-PN-006

Replace Wave Trap at Shade Gap

19 Months
$364,562

AG2-418, AH1-313, AH1-588, AH1-589

PENELEC(Pending) / TC2-PN-007.a

Adjust relay settings at Keystone and Shelocta

11 Months
$103,523

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELEC(Pending) / TC2-PN-007.b

Replace line drops at Keystone Substation (Keystone-Shelocta 230kV line terminal)

12 Months
$263,169

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELEC(Pending) / TC2-PN-009

Reconductor 6.2 miles of 115 kV Line between AH1-587 and AE2-113

22 Months
$21,700,478

AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AH1-313

PENELEC(Pending) / TC2-PN-010

Reconductor FE owned 4.3 miles of Laurel Lake - Goudey (Oakdale) 115 kV Line

20 Months
$16,174,322

AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-588, AH1-589

PENELEC(Pending) / TC2-PN-011

Replace 500/230 kV Conemaugh #3 Transformer

66 Months
$28,558,871

AG2-176, AG2-411, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn6816.1

Rebuild 11.84 miles of the Lewistown - Reeds Gap Switching Station 115 kV Line

28 Months
$39,212,597

AH1-313, AH1-588, AH1-589

PENELECn6816.2

Rebuild 0.18 miles of line and replace line drop at Reed Gap Switching Station.

18 Months
$1,716,483

AH1-313, AH1-588, AH1-589

PENELECn6817.1

Rebuild 24.59 miles of the Lewistown-Juniata 230kV transmission line

81 Months
$122,656,404

AG2-176, AG2-418, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-203, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn6820.1

Rebuild 22.36 miles of the Shade Gap to Reeds Gap Switching Station 115kV line

36 Months
$70,047,107

AG2-418, AH1-313, AH1-588, AH1-589

PENELECn6820.2

Rebuild 0.3 miles of line and replace line drop at Reed Gap Switching Station

18 Months
$2,259,738

AG2-418, AH1-313, AH1-588, AH1-589

PENELECn6820.4

Replace substation conductor at Shade Gap on the Shade Gap - Reeds Gap Switching Station 115 kV Line.

14 Months
$453,060

AG2-418, AH1-313, AH1-588, AH1-589

PENELECn6855.1

Replace substation conductor at Warren substation

22 Months
$796,717

AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

PENELECn6855.2

Rebuild 11.53 miles of transmission line between Warren and Glade.

49 Months
$58,429,217

AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

PENELECn6855.3

Replace line trap at Glade

12 Months
$230,000

AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

PENELECn6858.1

Reconductor 1.76 miles of the Garrett - Penn Mar 115 kV line.

37 Months
$6,867,997

AG2-411, AH1-201, AH1-203, AH1-205, AH1-460, AH1-588, AH1-589

PENELECn7114.1

Reconductor 9.7 miles of 115 kV line between AH1-587 Tap and Farmers Valley

25 Months
$34,336,933

AH1-313, AH1-587

PENELECn7114.2

Replace substation conductor at Farmers Valley substation

12 Months
$202,663

AH1-313, AH1-587

PENELECn7114.3

Adjust line relaying at Farmers Valley substation

12 Months
$52,848

AH1-313, AH1-587

PENELECn7641

Reconductor 9.41 miles of transmission line. Replace line drops at Carlisle Pike substation.

25 Months
$33,874,732

AG2-418

PENELECn7652

Replace line trap at Shawville on the Shawville-Rockton Mountain 115kV line.

19 Months
$364,562

AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

PENELECn7763.2

Adjust relay settings at Roxbury 115kV Substation

11 Months
$51,762

AG2-418, AH1-313

PENELECn8096

Install an additional 230kV circuit breaker between the East Towanda 230kV line terminal and the North Meshoppen 230/115kV #4 transformer.

45 Months
$1,621,562

AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720

AH1-313

PENELECn8229

Reconductor 18.7 miles the AE2-113 (Farmers Valley) - Ridgway 115 kV Line

32 Months
$62,172,697

AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589

AH1-313

PENELECn8281

Replace the Keystone #4 500/230 kV transformer with a larger unit and install a high side breaker

67 Months
$31,322,503

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn8471

East Sayre-North Waverly 115kV line upgrade - FirstEnergy (NYISO CY17 driven upgrade)

Nov 01 2027
Contingent

AG2-206, AG2-220, AG2-456, AG2-457, AG2-582, AH1-005, AH1-588, AH1-589, AH1-680, AH1-690, AH1-720

PENELECn9115.0 / PN-AF1-F-0022

Replace substation conductor at the 115 kV tie at Shawville Substation

14 Months
$509,322

AG2-456, AG2-457, AH1-587, AH1-588, AH1-589, AH1-667

PENELECn9116.0 / TC1-PN-001.d

Rebuild approximately 11 miles of the Homer City-Shelocta 230 kV line with double bundled 795 kcmil 26/7 ACSS conductor

31 Months
$39,312,233

AG2-176, AG2-411, AG2-456, AG2-457, AH1-102, AH1-203, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9117.0 / TC1-PN-001.f

Replace disconnect switches at Homer City Substation (Homer City-Shelocta 230kV line terminal)

24 Months
$1,254,760

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9118.0 / TC1-PN-001.g

Replace disconnect switches and leads at Shelocta Substation (Homer City-Shelocta 230kV line terminal)

26 Months
$1,783,345

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9119.0 / TC1-PN-003.b

Reconductor/Rebuild the Shelocta – Keystone 230 kV Line, approximately 2.5 miles, with 1272 kcmil 45/7 ACSR 2-conductor

23 Months
$9,533,592

AG2-176, AG2-411, AG2-456, AG2-457, AH1-102, AH1-140, AH1-203, AH1-313, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9120.0 / TC1-PN-003.c

Replace substation conductor at Keystone substation (Keystone-Shelocta 230kV line terminal)

12 Months
$187,749

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9121.0 / TC1-PN-003.d

Replace line drops at Keystone Substation (Keystone-Shelocta 230kV line terminal)

11 Months
$257,762

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9124.0 / TC1-PN-003.e

Replace bus conductor at Keystone Substation (Keystone-Shelocta 230kV line terminal)

13 Months
$1,104,686

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9125.0 / TC1-PN-003.f

Replace disconnect switches at Keystone Substation (Keystone-Shelocta 230kV line terminal)

24 Months
$1,254,762

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9126.0 / TC1-PN-003.h

Replace breaker leads at Keystone Substation (Keystone-Shelocta 230kV line terminal)

12 Months
$152,770

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9127.0 / TC1-PN-003.g

Replace disconnect switches and leads at Shelocta Substation (Keystone-Shelocta 230kV line terminal)

26 Months
$1,783,345

AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PENELECn9225.0 / TC1-PN-001.e

Replace 230 kV substation conductor and line drops at Shelocta substation for the Homer City-Shelocta 230 kV line terminal

13 Months
$107,569

AG2-176, AG2-411, AG2-456, AG2-457, AH1-102, AH1-203, AH1-460, AH1-587, AH1-588, AH1-589

PENELECs2764 / PN-2019-035

Rebuild the Piney-Grandview-Titusville-Union City-Erie South 115 kV line using double circuit 115 kV construction

Jun 01 2034
Contingent

AG2-438, AH1-491

PENELECs3335.1 / PN-2024-007

Replace Homer City South 345/230-23kV Transformer (Projected ISD 6/1/2027)

Jun 01 2027
Contingent

AG2-206, AG2-429, AG2-456, AG2-457, AH1-587, AH1-588, AH1-589

PEPCO(Pending) /

TC2 Upgrade for BURCHES 500.0 kV to 8POSSUM 500.0 kV ckt 1

48 to 60 Months
$6,000,000

AG2-436, AG2-570, AG2-571, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723

PEPCO(Pending) /

Additional Aspen to Dickerson H 230 kV line

24 to 48 Months
$86,480,000

AG2-304, AG2-436, AG2-570, AG2-571, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723, AH1-727, AH1-729

PEPCOb3780.11

Brighton Statcom and Capacitor (Projected ISD 12/31/2028)

Dec 31 2028
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PEPCOb3800.243

Rebuild 7.26 miles of existing 500 kV circuit from Dickerson Station H to Ed's Ferry

Dec 31 2030
Contingent

AH1-261

PEPCOb3800.244

Rebuild 7.26 miles of existing 230 kV circuit from Dickerson Station H to Ed's Ferry area to accommodate the new 500 kV circuit between Doubs and Aspen. (The 230kV portion of the project)

Dec 31 2030
Contingent

AG2-436, AG2-570, AH1-528, AH1-676, AH1-712, AH1-723, AH1-727

PEPCOb3800.244

Rebuild 7.26 miles of existing 230 kV circuit from Dickerson Station H to Ed's Ferry

Dec 31 2030
Contingent

AH1-261

PEPCOb3800.245

Reconfigure Dickerson H 230 kV Substation and upgrade terminal equipment.

Dec 31 2030
Contingent

AH1-261

PEPCOb3800.40

Conastone-Brighton 500 kV (5011 circuit) - Replace terminal equipment limitations at Brighton 500 kV.

Dec 31 2030
Contingent

AG2-347, AH1-695, AH1-710, AH1-725

PEPCOb3800.46

North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (PECO work).

Dec 01 2030
Contingent

AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725

PPLb3774

Reconductor/rebuild 0.64 miles of the PPL side of the Brunner Island - Yorkana 230 kV line (Projected ISD 6/1/2027)

Jun 01 2027
Contingent

AG2-166, AH1-695

PPLn6818

Rebuild PPL's ~0.9 miles LEWI-JUNI 230kV Line with a summer normal rating of at least 3000 Amps.

24 Months
$3,600,000

AG2-176, AG2-418, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-203, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589

PPLn7111 / R-PL-0005

Rebuild SUNB-ELIM 230kV line.

48 Months
$77,100,000

AG2-430, AH1-707

PPLn9114.0 / R-PL-0003

Rebuild FRAC-SIEG 230kV Line

72 Months
$120,600,000

AG2-161, AG2-430, AH1-707

PPLs0945.1

Rebuild the Juniata 230/69 kV Substation

Dec 31 2025
Contingent

AG2-176, AG2-456, AG2-457, AH1-102, AH1-313, AH1-587, AH1-588, AH1-589

PPLs3528.4

Susquehanna T10 Re-terminations

Jun 01 2027
Contingent

AG2-430, AH1-707

PSEG(Pending)

Upgrade Linden to MinueSt Q-2348 230 kV

30 Months
$9,183,000

AH1-715, AH1-722

PSEG(Pending)

Upgrade Sewaren to MinueSt Q-2348 230 kV

30 Months
$8,180,000

AH1-715, AH1-722

PSEG(Pending) / PSEG-TC2-PHQ_LindenGen

Upgrade PSE&G portion of the Linden 230kV generator lead line

24 Months
$3,708,000

AH1-715, AH1-722

PSEG(Pending) / PSEG-TC2_PH1_LindenMinueR

Upgrade Linden to MinueSt R-2218 230 kV circuit

30 Months
$9,000,000

AH1-715, AH1-722

PSEG(Pending) / PSEG-TC2_PH1_MinueSewarenR

Upgrade Minue St to Sewaren R-2218 230kV circuit

30 Months
$8,332,000

AH1-715, AH1-722

Cost Allocation details for n7868 / ACEMickDelcorebuildr01


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34763.23%$21,625,740
AH1-5848.92%$3,052,232
AH1-5858.92%$3,052,232
AH1-5869.34%$3,193,494
AH1-6349.58%$3,276,303

Cost Allocation details for (Pending) /


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-14460.00%$24,000
AH1-14540.00%$16,000

Cost Allocation details for (Pending) / AEP-TC2-18502


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1638.98%$10,595
AG2-24529.84%$35,202
AG2-36310.00%$11,799
AG2-3646.67%$7,866
AG2-6600.50%$591
AH1-0444.31%$5,084
AH1-1466.43%$7,585
AH1-1476.43%$7,585
AH1-1504.31%$5,084
AH1-1514.31%$5,084
AH1-3919.06%$10,685
AH1-4829.15%$10,790

Cost Allocation details for (Pending) / AEP-TC2-18505


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-19157.18%$400,254
AG2-19242.82%$299,746

Cost Allocation details for (Pending) / AEP-TC2-18516


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-3638.78%$0
AG2-3645.86%$0
AG2-4539.37%$0
AG2-5244.24%$0
AG2-5753.86%$0
AG2-5854.32%$0
AG2-6600.70%$0
AH1-0446.05%$0
AH1-1466.13%$0
AH1-1476.13%$0
AH1-1506.05%$0
AH1-1516.05%$0
AH1-1964.61%$0
AH1-2346.66%$0
AH1-3385.51%$0
AH1-3414.40%$0
AH1-5434.78%$0
AH1-7146.49%$0

Cost Allocation details for (Pending) / AEP-TC2-18621


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-0755.18%$1,878,293
AH1-3399.77%$3,542,020
AH1-53985.05%$30,839,687

Cost Allocation details for (Pending) / AEP-TC2-18624


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1849.67%$967
AG2-36032.43%$3,243
AH1-13333.91%$3,391
AH1-6179.21%$921
AH1-72114.78%$1,478

Cost Allocation details for (Pending) / AEP-TC2-18625


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-55028.70%$28,703
AG2-5519.22%$9,222
AG2-63743.95%$43,946
AH1-3084.38%$4,378
AH1-33713.75%$13,751

Cost Allocation details for (Pending) / AEP-TC2-18626


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-10448.56%$971,218
AG2-10617.15%$342,914
AG2-10717.15%$342,914
AG2-1655.72%$114,318
AG2-2125.72%$114,318
AG2-3285.72%$114,318

Cost Allocation details for (Pending) / AEP-TC2-18627


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1849.67%$10,642
AG2-36032.43%$35,668
AH1-13333.91%$37,296
AH1-6179.21%$10,135
AH1-72114.78%$16,259

Cost Allocation details for (Pending) / AEP-TC2-18630


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$21,800,000

Cost Allocation details for (Pending) / AEP-TC2-18633


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-55028.70%$28,703
AG2-5519.22%$9,222
AG2-63743.95%$43,946
AH1-3084.38%$4,378
AH1-33713.75%$13,751

Cost Allocation details for (Pending) / AEP-TC2-18634


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-10442.30%$9,863,852
AG2-10614.93%$3,482,723
AG2-10714.93%$3,482,723
AG2-1654.75%$1,107,466
AG2-2124.75%$1,107,466
AG2-3284.75%$1,107,466
AG2-6600.51%$118,252
AH1-0444.36%$1,016,684
AH1-1504.36%$1,016,684
AH1-1514.36%$1,016,684

Cost Allocation details for (Pending) / AEP-TC2-18635


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-10429.85%$7,224,603
AG2-10613.05%$3,157,906
AG2-10713.05%$3,157,906
AG2-1656.06%$1,465,331
AG2-2126.06%$1,465,331
AG2-3286.06%$1,465,331
AG2-6600.72%$173,249
AH1-0444.30%$1,039,432
AH1-1466.14%$1,486,023
AH1-1476.14%$1,486,023
AH1-1504.30%$1,039,432
AH1-1514.30%$1,039,432

Cost Allocation details for (Pending) / AEP-TC2-18636


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$18,000,000

Cost Allocation details for (Pending) / AEP-TC2-18639


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-370100.00%$800,000

Cost Allocation details for (Pending) / AEP-TC2-18642


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0144.11%$82,147
AG2-07213.54%$270,778
AG2-1268.40%$167,910
AG2-16328.39%$567,824
AG2-34310.30%$206,001
AG2-34413.50%$269,954
AG2-49117.66%$353,239
AG2-4924.11%$82,147

Cost Allocation details for (Pending) / AEP-TC2-18647


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$40,000,000

Cost Allocation details for (Pending) / AEP-TC2-18651


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-16512.22%$7,452
AG2-21212.22%$7,452
AG2-23014.89%$9,086
AG2-24515.16%$9,248
AG2-32812.22%$7,452
AH1-15314.89%$9,086
AH1-27218.40%$11,224

Cost Allocation details for (Pending) / AEP-TC2-18653


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0299.38%$14,361,607
AG2-10423.53%$36,021,171
AG2-10610.29%$15,751,205
AG2-10710.29%$15,751,205
AG2-1655.12%$7,831,194
AG2-2125.12%$7,831,194
AG2-3285.12%$7,831,194
AG2-3635.46%$8,360,122
AG2-3643.64%$5,573,304
AG2-6600.61%$934,905
AH1-0443.66%$5,609,097
AH1-1465.23%$8,012,806
AH1-1475.23%$8,012,806
AH1-1503.66%$5,609,097
AH1-1513.66%$5,609,097

Cost Allocation details for (Pending) / AEP-TC2-18654


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36068.69%$6,869
AH1-72131.31%$3,131

Cost Allocation details for (Pending) / AEP-TC2-18655


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-15274.04%$370,179
AG2-2725.12%$25,589
AG2-31112.73%$63,625
AH1-3148.12%$40,607

Cost Allocation details for (Pending) / AEP-TC2-18659


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0298.23%$782,187
AG2-07218.83%$1,788,915
AG2-1647.09%$673,560
AG2-1655.73%$544,470
AG2-2125.73%$544,470
AG2-2198.67%$823,250
AG2-2456.05%$574,740
AG2-3285.73%$544,470
AG2-4537.93%$752,978
AG2-6600.58%$54,650
AH1-0444.91%$466,912
AH1-1465.35%$507,787
AH1-1475.35%$507,787
AH1-1504.91%$466,912
AH1-1514.91%$466,912

Cost Allocation details for (Pending) / AEP-TC2-18663


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-370100.00%$6,800,000

Cost Allocation details for (Pending) / AEP-TC2-18665


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$14,700,000

Cost Allocation details for (Pending) / AEP-TC2-18670


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36311.23%$2,925,482
AG2-3647.48%$1,950,266
AG2-45311.84%$3,085,186
AG2-6600.90%$233,917
AH1-0447.72%$2,011,774
AH1-1467.82%$2,038,027
AH1-1477.82%$2,038,027
AH1-1507.72%$2,011,774
AH1-1517.72%$2,011,774
AH1-2348.50%$2,214,222
AH1-3387.02%$1,829,773
AH1-5436.10%$1,589,376
AH1-7148.14%$2,120,403

Cost Allocation details for (Pending) / AEP-TC2-18671


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$40,000,000

Cost Allocation details for (Pending) / AEP-TC2-18673


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-31011.96%$567,968
AG2-51870.05%$3,327,344
AH1-26917.99%$854,688

Cost Allocation details for (Pending) / AEP-TC2-18675


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-54828.81%$4,687,328
AG2-66528.81%$4,687,328
AH1-66942.38%$6,894,685

Cost Allocation details for (Pending) / AEP-TC2-18677


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36310.54%$421,558
AG2-3647.03%$281,039
AG2-45312.82%$512,720
AG2-6600.89%$35,738
AH1-0447.68%$307,333
AH1-1467.76%$310,580
AH1-1477.76%$310,580
AH1-1507.68%$307,333
AH1-1517.68%$307,333
AH1-2348.38%$335,185
AH1-3387.04%$281,438
AH1-5435.99%$239,681
AH1-7148.74%$349,484

Cost Allocation details for (Pending) / AEP-TC2-18678


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44430.91%$9,582,064
AG2-54822.94%$7,112,320
AG2-66522.94%$7,112,320
AH1-66923.20%$7,193,296

Cost Allocation details for (Pending) / AEP-TC2-18679


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-10439.45%$5,601,667
AG2-10613.93%$1,977,802
AG2-10713.93%$1,977,802
AG2-1655.65%$801,735
AG2-2125.65%$801,735
AG2-3285.65%$801,735
AG2-6600.59%$83,493
AH1-0445.06%$718,010
AH1-1505.06%$718,010
AH1-1515.06%$718,010

Cost Allocation details for (Pending) / AEP-TC2-18680


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-10429.85%$656,782
AG2-10613.05%$287,082
AG2-10713.05%$287,082
AG2-1656.06%$133,212
AG2-2126.06%$133,212
AG2-3286.06%$133,212
AG2-6600.72%$15,750
AH1-0444.30%$94,494
AH1-1466.14%$135,093
AH1-1476.14%$135,093
AH1-1504.30%$94,494
AH1-1514.30%$94,494

Cost Allocation details for (Pending) / AEP-TC2-18681


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-14910.36%$6,072,657
AH1-5396.25%$3,662,823
AH1-69068.65%$40,254,475
AH1-71114.75%$8,650,044

Cost Allocation details for (Pending) / AEP-TC2-18682


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-10458.61%$1,893,125
AG2-10620.69%$668,438
AG2-10720.69%$668,438

Cost Allocation details for (Pending) / AEP-TC2-18683


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-18435.43%$63,773
AH1-22713.95%$25,117
AH1-61733.74%$60,740
AH1-64416.87%$30,370

Cost Allocation details for (Pending) / AEP-TC2-18685


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-31012.73%$24,186
AG2-51869.13%$131,354
AH1-26918.14%$34,459

Cost Allocation details for (Pending) / AEP-TC2-18686


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-02921.28%$10,215,121
AG2-07222.43%$10,764,049
AG2-1658.01%$3,845,946
AG2-2128.01%$3,845,946
AG2-3288.01%$3,845,946
AG2-3638.49%$4,075,984
AG2-3645.66%$2,717,323
AG2-6600.95%$457,488
AH1-0445.72%$2,744,065
AH1-1505.72%$2,744,065
AH1-1515.72%$2,744,065

Cost Allocation details for (Pending) / AEP-TC2-18687


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07233.45%$167,271
AG2-16411.14%$55,708
AG2-1654.90%$24,516
AG2-2124.90%$24,516
AG2-21913.62%$68,088
AG2-3284.90%$24,516
AG2-3319.08%$45,381
AG2-3634.79%$23,947
AG2-3643.19%$15,965
AG2-6600.53%$2,637
AH1-0443.16%$15,819
AH1-1503.16%$15,819
AH1-1513.16%$15,819

Cost Allocation details for (Pending) / AEP-TC2-18689


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-02915.67%$1,136,386
AG2-07216.67%$1,208,588
AG2-1655.92%$429,462
AG2-2125.92%$429,462
AG2-3285.92%$429,462
AG2-3636.28%$455,647
AG2-3644.19%$303,744
AG2-4008.57%$621,248
AG2-4538.93%$647,116
AG2-6600.71%$51,546
AH1-0444.23%$306,731
AH1-1464.26%$308,574
AH1-1474.26%$308,574
AH1-1504.23%$306,731
AH1-1514.23%$306,731

Cost Allocation details for (Pending) / AEP-TC2-18690


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36063.20%$44,238
AH1-13311.29%$7,900
AH1-72125.52%$17,861

Cost Allocation details for (Pending) / AEP-TC2-18693


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0295.73%$57,344,152
AG2-07217.73%$177,273,817
AG2-1645.47%$54,704,127
AG2-1656.60%$65,982,922
AG2-2126.60%$65,982,922
AG2-2198.40%$84,044,734
AG2-3286.60%$65,982,922
AG2-3635.70%$56,958,574
AG2-3643.80%$37,971,836
AG2-4535.86%$58,593,344
AG2-6600.66%$6,591,210
AH1-0445.47%$54,655,930
AH1-1465.23%$52,300,825
AH1-1475.23%$52,300,825
AH1-1505.47%$54,655,930
AH1-1515.47%$54,655,930

Cost Allocation details for (Pending) / AEP-TC2-18695


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-18441.18%$41,177
AH1-61739.22%$39,216
AH1-64419.61%$19,608

Cost Allocation details for (Pending) / AEP-TC2-18699


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-54850.00%$150,000
AG2-66550.00%$150,000

Cost Allocation details for (Pending) / AEP-TC2-18700


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-02911.65%$7,690,422
AH1-5398.04%$5,308,563
AH1-69066.04%$43,588,025
AH1-71114.26%$9,412,990

Cost Allocation details for (Pending) / AEP-TC2-18701


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-482100.00%$0

Cost Allocation details for (Pending) / AEP-TC2-18702


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$3,800,000

Cost Allocation details for (Pending) / AEP-TC2-18703


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-18444.21%$10,168,421
AH1-61742.11%$9,684,211
AH1-64413.68%$3,147,368

Cost Allocation details for (Pending) / AEP-TC2-18704


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1115.35%$1,710,840
AG2-1125.60%$1,793,537
AG2-15241.39%$13,245,672
AG2-31119.29%$6,172,896
AG2-54118.91%$6,049,740
AH1-3439.46%$3,027,315

Cost Allocation details for (Pending) / AEP-TC2-18707


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-02918.67%$933,382
AG2-1657.13%$356,344
AG2-2127.13%$356,344
AG2-3287.13%$356,344
AG2-3637.58%$379,162
AG2-3645.06%$252,766
AG2-40010.13%$506,712
AG2-45310.75%$537,555
AG2-6600.85%$42,534
AH1-0445.10%$255,176
AH1-1465.13%$256,663
AH1-1475.13%$256,663
AH1-1505.10%$255,176
AH1-1515.10%$255,176

Cost Allocation details for (Pending) / AEP-TC2-18708


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-18426.00%$389,971
AH1-22710.00%$150,058
AH1-61724.76%$371,393
AH1-64412.38%$185,706
AH1-72126.86%$402,872

Cost Allocation details for (Pending) / AEP-TC2-18709


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-15268.66%$34,332
AG2-31116.26%$8,132
AG2-5417.31%$3,656
AH1-3437.76%$3,881

Cost Allocation details for (Pending) / AEP-TC2-18711


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-18424.89%$398,197
AH1-2279.38%$150,152
AH1-61723.70%$379,233
AH1-64411.85%$189,617
AH1-72130.18%$482,801

Cost Allocation details for (Pending) / AEP-TC2-18712


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-18441.18%$20,588
AH1-61739.22%$19,608
AH1-64419.61%$9,804

Cost Allocation details for (Pending) / AEP-TC2-18715


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0144.11%$82,147
AG2-07213.54%$270,778
AG2-1268.40%$167,910
AG2-16328.39%$567,824
AG2-34310.30%$206,001
AG2-34413.50%$269,954
AG2-49117.66%$353,239
AG2-4924.11%$82,147

Cost Allocation details for (Pending) / AEP-TC2-18717


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-15268.66%$1,167,298
AG2-31116.26%$276,475
AG2-5417.31%$124,289
AH1-3437.76%$131,938

Cost Allocation details for (Pending) / AEP-TC2-18727


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-31010.85%$39,055
AG2-51863.55%$228,797
AH1-1449.27%$33,359
AH1-26916.33%$58,789

Cost Allocation details for (Pending) / AEP-TC2-18729


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-54850.00%$125,000
AG2-66550.00%$125,000

Cost Allocation details for (Pending) / AEP-TC2-18730


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-0755.18%$1,010,114
AH1-3399.77%$1,904,837
AH1-53985.05%$16,585,049

Cost Allocation details for (Pending) / AEP-TC2-18731


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$100,000

Cost Allocation details for (Pending) / AEP-TC2-18732


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-02915.68%$705,383
AG2-07216.67%$750,201
AG2-1655.92%$266,578
AG2-2125.92%$266,578
AG2-3285.92%$266,578
AG2-3636.29%$282,832
AG2-3644.19%$188,541
AG2-4008.57%$385,624
AG2-4538.93%$401,681
AG2-6600.71%$31,739
AH1-0444.23%$190,396
AH1-1464.26%$191,540
AH1-1474.26%$191,540
AH1-1504.23%$190,396
AH1-1514.23%$190,396

Cost Allocation details for (Pending) / AEP-TC2-18733


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-02911.66%$794,214
AH1-5398.04%$547,769
AH1-69066.19%$4,507,618
AH1-71114.10%$960,398

Cost Allocation details for (Pending) / AEP-TC2-18751


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07215.86%$801,284
AG2-1645.54%$280,050
AG2-2196.40%$323,479
AG2-3633.62%$182,685
AG2-3642.41%$121,784
AG2-6600.40%$20,099
AH1-0442.39%$120,609
AH1-05528.87%$1,458,266
AH1-1502.39%$120,609
AH1-1512.39%$120,609
AH1-53717.00%$858,815
AH1-72112.74%$643,710

Cost Allocation details for (Pending) / AEP-TC2-18798


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-24524.25%$10,693,061
AG2-36310.54%$4,647,505
AG2-3647.03%$3,098,416
AG2-45310.89%$4,804,242
AG2-6600.83%$366,433
AH1-0447.15%$3,151,374
AH1-1467.23%$3,186,284
AH1-1477.23%$3,186,284
AH1-1507.15%$3,151,374
AH1-1517.15%$3,151,374
AH1-39110.58%$4,663,654

Cost Allocation details for (Pending) / AEP-TC2-18819


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07237.17%$1,226,646
AG2-16412.33%$406,897
AG2-21915.07%$497,307
AG2-3636.35%$209,698
AG2-3644.24%$139,813
AG2-6600.69%$22,859
AH1-0444.16%$137,152
AH1-1504.16%$137,152
AH1-1514.16%$137,152
AH1-53711.68%$385,325

Cost Allocation details for (Pending) / AEP-TC2-18821


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07257.69%$3,864,952
AG2-16514.10%$945,016
AG2-21214.10%$945,016
AG2-32814.10%$945,016

Cost Allocation details for (Pending) / AEPAPRJV002


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$82,200

Cost Allocation details for (Pending) / AEPAPRJV004


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1117.07%$18,378
AG2-1127.41%$19,267
AG2-1529.98%$25,960
AG2-31110.21%$26,550
AG2-54131.69%$82,388
AH1-34333.64%$87,457

Cost Allocation details for (Pending) / AEPAPRJV006_2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$60,000

Cost Allocation details for (Pending) / AEPI0020K


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1638.98%$13,474
AG2-24529.84%$44,767
AG2-36310.00%$15,005
AG2-3646.67%$10,003
AG2-6600.50%$752
AH1-0444.31%$6,465
AH1-1466.43%$9,646
AH1-1476.43%$9,646
AH1-1504.31%$6,465
AH1-1514.31%$6,465
AH1-3919.06%$13,588
AH1-4829.15%$13,722

Cost Allocation details for (Pending) / AEPSERG03


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-55022.34%$457,372
AG2-55120.31%$415,776
AG2-63726.51%$542,877
AH1-30823.30%$477,070
AH1-3377.54%$154,404

Cost Allocation details for n5857 / N5857


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-66421.49%$4,201,238
AH1-66517.19%$3,360,662
AH1-66616.79%$3,282,457
AH1-72144.54%$8,707,643

Cost Allocation details for n6525.2 / AEPO0026d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.83%$18,855
AH1-69078.99%$308,043
AH1-71116.18%$63,102

Cost Allocation details for n6525.3 / AEPO0026f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.83%$659,940
AH1-69078.99%$10,781,492
AH1-71116.18%$2,208,568

Cost Allocation details for n6600 / AEPI0001a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36310.54%$411,019
AG2-3647.03%$274,013
AG2-45312.82%$499,902
AG2-6600.89%$34,844
AH1-0447.68%$299,650
AH1-1467.76%$302,815
AH1-1477.76%$302,815
AH1-1507.68%$299,650
AH1-1517.68%$299,650
AH1-2348.38%$326,805
AH1-3387.04%$274,402
AH1-5435.99%$233,689
AH1-7148.74%$340,747

Cost Allocation details for n7619.1 / AEPI0032a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-24524.25%$315,215
AG2-36310.54%$137,001
AG2-3647.03%$91,337
AG2-45310.89%$141,622
AG2-6600.83%$10,802
AH1-0447.15%$92,898
AH1-1467.23%$93,927
AH1-1477.23%$93,927
AH1-1507.15%$92,898
AH1-1517.15%$92,898
AH1-39110.58%$137,477

Cost Allocation details for n7619.2 / AEPI0032b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-24524.25%$6,789,245
AG2-36310.54%$2,950,797
AG2-3647.03%$1,967,248
AG2-45310.89%$3,050,313
AG2-6600.83%$232,656
AH1-0447.15%$2,000,872
AH1-1467.23%$2,023,037
AH1-1477.23%$2,023,037
AH1-1507.15%$2,000,872
AH1-1517.15%$2,000,872
AH1-39110.58%$2,961,050

Cost Allocation details for n7683


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-02915.67%$2,893,473
AG2-07216.67%$3,077,314
AG2-1655.92%$1,093,498
AG2-2125.92%$1,093,498
AG2-3285.92%$1,093,498
AG2-3636.28%$1,160,173
AG2-3644.19%$773,395
AG2-4008.57%$1,581,826
AG2-4538.93%$1,647,691
AG2-6600.71%$131,246
AH1-0444.23%$781,001
AH1-1464.26%$785,694
AH1-1474.26%$785,694
AH1-1504.23%$781,001
AH1-1514.23%$781,001

Cost Allocation details for n8383


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$78,000

Cost Allocation details for n8386


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$78,000

Cost Allocation details for n9182.0 / AEPIMJMS01


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36312.92%$4,521,241
AG2-3648.61%$3,014,160
AG2-45313.69%$4,791,085
AG2-6601.03%$360,193
AH1-0448.85%$3,097,898
AH1-1468.98%$3,141,770
AH1-1478.98%$3,141,770
AH1-1508.85%$3,097,898
AH1-1518.85%$3,097,898
AH1-2349.74%$3,410,012
AH1-7149.50%$3,326,074

Cost Allocation details for n9669.0 / AEPO0027e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$130,000

Cost Allocation details for n9674.0 / AEPO0026b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.83%$12,570
AH1-69078.99%$205,362
AH1-71116.18%$42,068

Cost Allocation details for n9675.0 / AEPO0035a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-14929.75%$68,228
AG2-32913.49%$30,940
AH1-69047.03%$107,857
AH1-7119.72%$22,295

Cost Allocation details for n9676.0 / AEPO0033a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$99,840

Cost Allocation details for (Pending) / TC1-APS-002.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.58%$74,428
AG2-4299.80%$58,004
AG2-4566.19%$36,643
AG2-4576.19%$36,643
AH1-0503.97%$23,518
AH1-0512.38%$14,109
AH1-1582.77%$16,408
AH1-3571.55%$9,165
AH1-3581.80%$10,653
AH1-3591.55%$9,165
AH1-3601.80%$10,653
AH1-58715.54%$91,986
AH1-58818.57%$109,937
AH1-58915.30%$90,553

Cost Allocation details for (Pending) / TC1-APS-002.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.58%$4,768,689
AG2-4299.80%$3,716,379
AG2-4566.19%$2,347,771
AG2-4576.19%$2,347,771
AH1-0503.97%$1,506,831
AH1-0512.38%$903,998
AH1-1582.77%$1,051,301
AH1-3571.55%$587,195
AH1-3581.80%$682,538
AH1-3591.55%$587,195
AH1-3601.80%$682,538
AH1-58715.54%$5,893,642
AH1-58818.57%$7,043,817
AH1-58915.30%$5,801,829

Cost Allocation details for (Pending) / TC1-PH1-004


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65895.09%$65,100,586
AH1-4263.27%$2,241,969
AH1-426A1.64%$1,121,095

Cost Allocation details for (Pending) / TC1-PH1-005


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65869.84%$12,078,387
AH1-42620.11%$3,478,042
AH1-426A10.05%$1,739,021

Cost Allocation details for (Pending) / TC1-PH1-010


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65869.84%$10,527,493
AH1-42620.11%$3,031,453
AH1-426A10.05%$1,515,727

Cost Allocation details for (Pending) / TC1-PH1-011


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65869.84%$5,967,522
AH1-42620.11%$1,718,430
AH1-426A10.05%$859,215

Cost Allocation details for (Pending) / TC1-PH1-014


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4565.77%$17,795
AG2-4575.77%$17,795
AH1-31331.67%$97,708
AH1-3571.44%$4,448
AH1-3581.68%$5,171
AH1-3591.44%$4,448
AH1-3601.68%$5,171
AH1-58719.00%$58,633
AH1-58817.30%$53,385
AH1-58914.25%$43,971

Cost Allocation details for (Pending) / TC1-PH1-066


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4118.42%$1,534,022
AG2-4564.96%$904,307
AG2-4574.96%$904,307
AH1-10213.55%$2,468,724
AH1-2038.57%$1,561,819
AH1-2685.76%$1,050,565
AH1-3571.24%$226,012
AH1-3581.44%$262,901
AH1-3591.24%$226,012
AH1-3601.44%$262,901
AH1-4608.96%$1,632,480
AH1-58712.31%$2,243,751
AH1-58814.88%$2,712,661
AH1-58912.26%$2,234,139

Cost Allocation details for (Pending) / TC1-PH1-076


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.89%$6,681,371
AG2-42912.33%$6,391,032
AG2-4564.89%$2,532,941
AG2-4574.89%$2,532,941
AH1-0504.64%$2,406,396
AH1-0512.79%$1,444,041
AH1-1023.51%$1,818,574
AH1-1583.24%$1,678,762
AH1-2681.49%$774,067
AH1-3135.11%$2,646,729
AH1-3571.22%$633,235
AH1-3581.42%$736,308
AH1-3591.22%$633,235
AH1-3601.42%$736,308
AH1-58712.23%$6,337,964
AH1-58814.66%$7,598,312
AH1-58912.07%$6,258,364

Cost Allocation details for (Pending) / TC1-PH1-099


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65869.86%$18,360,016
AH1-42620.09%$5,281,378
AH1-426A10.05%$2,640,689

Cost Allocation details for (Pending) / TC2-APS-001.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-615100.00%$432,791

Cost Allocation details for (Pending) / TC2-APS-001.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-615100.00%$426,600

Cost Allocation details for (Pending) / TC2-APS-002.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-50533.16%$143,517
AG2-58243.76%$189,395
AG2-61523.08%$99,879

Cost Allocation details for (Pending) / TC2-APS-002.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-50543.11%$7,245,478
AG2-58256.89%$9,561,669

Cost Allocation details for (Pending) / TC2-APS-003


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42388.05%$5,974,200
AG2-61511.95%$810,669

Cost Allocation details for (Pending) / TC2-APS-004


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-340100.00%$8,699,919

Cost Allocation details for (Pending) / TC2-APS-005


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65717.10%$62,330
AH1-42655.27%$201,490
AH1-426A27.63%$100,742

Cost Allocation details for (Pending) / TC2-APS-006


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-288100.00%$9,809,215

Cost Allocation details for (Pending) / TC2-APS-008.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-615100.00%$189,159

Cost Allocation details for (Pending) / TC2-APS-008.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-615100.00%$92,496,484

Cost Allocation details for (Pending) / TC2-APS-009.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$36,786,038

Cost Allocation details for (Pending) / TC2-APS-009.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$1,098,322

Cost Allocation details for (Pending) / TC2-APS-010


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65869.86%$66,111,548
AH1-42620.09%$19,017,417
AH1-426A10.05%$9,508,708

Cost Allocation details for (Pending) / TC2-APS-011.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$16,988,135

Cost Allocation details for (Pending) / TC2-APS-011.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$509,895

Cost Allocation details for (Pending) / TC2-APS-012.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$977,534

Cost Allocation details for (Pending) / TC2-APS-012.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$16,031,404

Cost Allocation details for (Pending) / TC2-APS-012.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$157,861

Cost Allocation details for (Pending) / TC2-APS-012.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$396,495

Cost Allocation details for (Pending) / TC2-APS-013


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-41115.60%$41,051
AH1-20111.40%$29,993
AH1-20327.09%$71,304
AH1-2055.30%$13,948
AH1-46014.95%$39,335
AH1-58814.07%$37,032
AH1-58911.59%$30,506

Cost Allocation details for (Pending) / TC2-APS-015.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$28,558,871

Cost Allocation details for (Pending) / TC2-APS-015.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$1,826,164

Cost Allocation details for (Pending) / TC2-APS-016.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$28,558,871

Cost Allocation details for (Pending) / TC2-APS-016.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$1,826,164

Cost Allocation details for (Pending) / TC2-APS-016.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$597,737

Cost Allocation details for (Pending) / TC2-APS-017


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4568.58%$1,768,665
AG2-4578.58%$1,768,665
AH1-3572.15%$442,274
AH1-3582.49%$513,971
AH1-3592.15%$442,274
AH1-3602.49%$513,971
AH1-58726.62%$5,488,260
AH1-58825.74%$5,305,994
AH1-58921.20%$4,370,481

Cost Allocation details for (Pending) / TC2-APS-018


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-1024.82%$269,164
AH1-14078.77%$4,396,628
AH1-2684.13%$230,720
AH1-5886.16%$343,894
AH1-5896.11%$341,261

Cost Allocation details for (Pending) / TC2-APS-019.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44866.93%$20,964,865
AG2-50519.51%$6,109,785
AG2-61513.56%$4,248,516

Cost Allocation details for (Pending) / TC2-APS-019.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44877.43%$683,304
AG2-50522.57%$199,135

Cost Allocation details for (Pending) / TC2-APS-020.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4566.55%$38,765
AG2-4576.55%$38,765
AH1-31322.13%$130,996
AH1-3571.64%$9,690
AH1-3581.90%$11,272
AH1-3591.64%$9,690
AH1-3601.90%$11,272
AH1-58721.85%$129,320
AH1-58819.65%$116,302
AH1-58916.18%$95,792

Cost Allocation details for (Pending) / TC2-APS-020.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4566.55%$6,572,556
AG2-4576.55%$6,572,556
AH1-31322.13%$22,210,191
AH1-3571.64%$1,642,873
AH1-3581.90%$1,911,184
AH1-3591.64%$1,642,873
AH1-3601.90%$1,911,184
AH1-58721.85%$21,925,909
AH1-58819.65%$19,718,731
AH1-58916.18%$16,241,335

Cost Allocation details for (Pending) / TC2-APS-021


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-61586.11%$372,672
AH1-20313.89%$60,118

Cost Allocation details for (Pending) / TC2-APS-023.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44859.67%$2,642,052
AG2-50517.39%$769,895
AG2-58222.95%$1,016,011

Cost Allocation details for (Pending) / TC2-APS-026.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.58%$157,816
AG2-4299.80%$122,991
AG2-4566.19%$77,698
AG2-4576.19%$77,698
AH1-0503.97%$49,867
AH1-0512.38%$29,917
AH1-1582.77%$34,792
AH1-3571.55%$19,433
AH1-3581.80%$22,588
AH1-3591.55%$19,433
AH1-3601.80%$22,588
AH1-58715.54%$195,045
AH1-58818.57%$233,110
AH1-58915.30%$192,007

Cost Allocation details for (Pending) / TC2-APS-026.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.58%$45,844
AG2-4299.80%$35,728
AG2-4566.19%$22,571
AG2-4576.19%$22,571
AH1-0503.97%$14,486
AH1-0512.38%$8,691
AH1-1582.77%$10,107
AH1-3571.55%$5,645
AH1-3581.80%$6,562
AH1-3591.55%$5,645
AH1-3601.80%$6,562
AH1-58715.54%$56,659
AH1-58818.57%$67,716
AH1-58915.30%$55,776

Cost Allocation details for (Pending) / TC2-APS-027


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65718.30%$118,169
AH1-42654.47%$351,804
AH1-426A27.23%$175,895

Cost Allocation details for (Pending) / TC2-APS-028


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-58265.47%$8,051,517
AG2-61534.53%$4,246,007

Cost Allocation details for (Pending) / TC2-APS-029


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$13,223,334

Cost Allocation details for (Pending) / TC2-APS-031.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.88%$23,651
AG2-42912.32%$22,617
AG2-4564.89%$8,972
AG2-4574.89%$8,972
AH1-0504.64%$8,519
AH1-0512.78%$5,111
AH1-1023.51%$6,453
AH1-1583.24%$5,944
AH1-2681.50%$2,746
AH1-3135.11%$9,378
AH1-3571.22%$2,243
AH1-3581.42%$2,608
AH1-3591.22%$2,243
AH1-3601.42%$2,608
AH1-58712.23%$22,448
AH1-58814.66%$26,916
AH1-58912.08%$22,170

Cost Allocation details for (Pending) / TC2-APS-031.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.88%$74,676
AG2-42912.32%$71,413
AG2-4564.89%$28,328
AG2-4574.89%$28,328
AH1-0504.64%$26,900
AH1-0512.78%$16,136
AH1-1023.51%$20,374
AH1-1583.24%$18,766
AH1-2681.50%$8,669
AH1-3135.11%$29,611
AH1-3571.22%$7,083
AH1-3581.42%$8,236
AH1-3591.22%$7,083
AH1-3601.42%$8,236
AH1-58712.23%$70,877
AH1-58814.66%$84,984
AH1-58912.08%$70,000

Cost Allocation details for (Pending) / TC2-APS-032.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65884.86%$309,360
AH1-42610.09%$36,800
AH1-426A5.05%$18,402

Cost Allocation details for (Pending) / TC2-APS-032.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65884.86%$47,052,085
AH1-42610.09%$5,597,092
AH1-426A5.05%$2,798,821

Cost Allocation details for (Pending) / TC2-APS-032.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65884.86%$223,320
AH1-42610.09%$26,565
AH1-426A5.05%$13,284

Cost Allocation details for (Pending) / TC2-APS-033


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-615100.00%$92,496,484

Cost Allocation details for (Pending) / TC2-APS-034.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$23,212
AG2-4565.72%$24,457
AG2-4575.72%$24,457
AH1-31323.31%$99,664
AH1-3571.43%$6,115
AH1-3581.66%$7,109
AH1-3591.43%$6,115
AH1-3601.66%$7,109
AH1-58718.47%$78,969
AH1-58817.16%$73,370
AH1-58914.14%$60,433
AH1-7203.86%$16,507

Cost Allocation details for (Pending) / TC2-APS-034.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$14,289
AG2-4565.72%$15,055
AG2-4575.72%$15,055
AH1-31323.31%$61,351
AH1-3571.43%$3,764
AH1-3581.66%$4,376
AH1-3591.43%$3,764
AH1-3601.66%$4,376
AH1-58718.47%$48,611
AH1-58817.16%$45,165
AH1-58914.14%$37,201
AH1-7203.86%$10,161

Cost Allocation details for (Pending) / TC2-APS-034.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$3,986,293
AG2-4565.72%$4,200,034
AG2-4575.72%$4,200,034
AH1-31323.31%$17,115,709
AH1-3571.43%$1,050,141
AH1-3581.66%$1,220,922
AH1-3591.43%$1,050,141
AH1-3601.66%$1,220,922
AH1-58718.47%$13,561,671
AH1-58817.16%$12,600,102
AH1-58914.14%$10,378,364
AH1-7203.86%$2,834,851

Cost Allocation details for (Pending) / TC2-APS-034.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$38,634
AG2-4565.72%$40,705
AG2-4575.72%$40,705
AH1-31323.31%$165,880
AH1-3571.43%$10,178
AH1-3581.66%$11,833
AH1-3591.43%$10,178
AH1-3601.66%$11,833
AH1-58718.47%$131,436
AH1-58817.16%$122,116
AH1-58914.14%$100,584
AH1-7203.86%$27,474

Cost Allocation details for (Pending) / TC2-APS-034.e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$84,883
AG2-4565.72%$89,434
AG2-4575.72%$89,434
AH1-31323.31%$364,456
AH1-3571.43%$22,361
AH1-3581.66%$25,998
AH1-3591.43%$22,361
AH1-3601.66%$25,998
AH1-58718.47%$288,777
AH1-58817.16%$268,302
AH1-58914.14%$220,993
AH1-7203.86%$60,364

Cost Allocation details for (Pending) / TC2-APS-034.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$11,653
AG2-4565.72%$12,278
AG2-4575.72%$12,278
AH1-31323.31%$50,033
AH1-3571.43%$3,070
AH1-3581.66%$3,569
AH1-3591.43%$3,070
AH1-3601.66%$3,569
AH1-58718.47%$39,643
AH1-58817.16%$36,833
AH1-58914.14%$30,338
AH1-7203.86%$8,287

Cost Allocation details for (Pending) / TC2-APS-034.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$27,685
AG2-4565.72%$29,169
AG2-4575.72%$29,169
AH1-31323.31%$118,868
AH1-3571.43%$7,293
AH1-3581.66%$8,479
AH1-3591.43%$7,293
AH1-3601.66%$8,479
AH1-58718.47%$94,186
AH1-58817.16%$87,507
AH1-58914.14%$72,078
AH1-7203.86%$19,688

Cost Allocation details for (Pending) / TC2-APS-034.h


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$27,685
AG2-4565.72%$29,169
AG2-4575.72%$29,169
AH1-31323.31%$118,868
AH1-3571.43%$7,293
AH1-3581.66%$8,479
AH1-3591.43%$7,293
AH1-3601.66%$8,479
AH1-58718.47%$94,186
AH1-58817.16%$87,507
AH1-58914.14%$72,078
AH1-7203.86%$19,688

Cost Allocation details for (Pending) / TC2-APS-034.i


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$88,043
AG2-4565.72%$92,763
AG2-4575.72%$92,763
AH1-31323.31%$378,024
AH1-3571.43%$23,194
AH1-3581.66%$26,966
AH1-3591.43%$23,194
AH1-3601.66%$26,966
AH1-58718.47%$299,528
AH1-58817.16%$278,290
AH1-58914.14%$229,220
AH1-7203.86%$62,612

Cost Allocation details for (Pending) / TC2-APS-036.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.39%$134,446
AG2-2063.41%$36,943
AG2-2202.21%$24,018
AG2-2211.46%$15,835
AG2-3270.71%$7,698
AG2-3561.46%$15,835
AG2-4567.33%$79,512
AG2-4577.33%$79,512
AH1-0051.43%$15,493
AH1-3571.83%$19,881
AH1-3582.13%$23,114
AH1-3591.83%$19,881
AH1-3602.13%$23,114
AH1-58714.25%$154,598
AH1-58821.99%$238,544
AH1-58918.11%$196,477

Cost Allocation details for (Pending) / TC2-APS-036.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.39%$1,651,452
AG2-2063.41%$453,783
AG2-2202.21%$295,018
AG2-2211.46%$194,512
AG2-3270.71%$94,561
AG2-3561.46%$194,512
AG2-4567.33%$976,683
AG2-4577.33%$976,683
AH1-0051.43%$190,311
AH1-3571.83%$244,210
AH1-3582.13%$283,921
AH1-3591.83%$244,210
AH1-3602.13%$283,921
AH1-58714.25%$1,898,991
AH1-58821.99%$2,930,128
AH1-58918.11%$2,413,410

Cost Allocation details for (Pending) / TC2-APS-036.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.39%$63,188
AG2-2063.41%$17,363
AG2-2202.21%$11,288
AG2-2211.46%$7,442
AG2-3270.71%$3,618
AG2-3561.46%$7,442
AG2-4567.33%$37,370
AG2-4577.33%$37,370
AH1-0051.43%$7,282
AH1-3571.83%$9,344
AH1-3582.13%$10,863
AH1-3591.83%$9,344
AH1-3602.13%$10,863
AH1-58714.25%$72,660
AH1-58821.99%$112,113
AH1-58918.11%$92,343

Cost Allocation details for (Pending) / TC2-APS-036.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.39%$23,950
AG2-2063.41%$6,581
AG2-2202.21%$4,279
AG2-2211.46%$2,821
AG2-3270.71%$1,371
AG2-3561.46%$2,821
AG2-4567.33%$14,164
AG2-4577.33%$14,164
AH1-0051.43%$2,760
AH1-3571.83%$3,542
AH1-3582.13%$4,118
AH1-3591.83%$3,542
AH1-3602.13%$4,118
AH1-58714.25%$27,540
AH1-58821.99%$42,494
AH1-58918.11%$35,001

Cost Allocation details for (Pending) / TC2-PH1-019.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44877.43%$394,830
AG2-50522.57%$115,065

Cost Allocation details for (Pending) / TC2-PH1-019.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44877.43%$394,830
AG2-50522.57%$115,065

Cost Allocation details for (Pending) / TC2-PH1-023.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44853.23%$230,361
AG2-50515.51%$67,127
AG2-58220.47%$88,586
AG2-61510.79%$46,716

Cost Allocation details for (Pending) / TC2-PH1-025


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-582100.00%$8,443,469

Cost Allocation details for (Pending) / TC2-PN-002.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$3,198,575
AG2-4565.72%$3,370,080
AG2-4575.72%$3,370,080
AH1-31323.31%$13,733,532
AH1-3571.43%$842,626
AH1-3581.66%$979,659
AH1-3591.43%$842,626
AH1-3601.66%$979,659
AH1-58718.47%$10,881,795
AH1-58817.16%$10,110,239
AH1-58914.14%$8,327,531
AH1-7203.86%$2,274,665

Cost Allocation details for (Pending) / TC2-PN-002.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.43%$9,608
AG2-4565.72%$10,123
AG2-4575.72%$10,123
AH1-31323.31%$41,252
AH1-3571.43%$2,531
AH1-3581.66%$2,943
AH1-3591.43%$2,531
AH1-3601.66%$2,943
AH1-58718.47%$32,686
AH1-58817.16%$30,368
AH1-58914.14%$25,014
AH1-7203.86%$6,832

Cost Allocation details for (Pending) / WP-AF1-F-0001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34714.50%$52,856
AH1-6342.20%$8,009
AH1-69537.61%$137,130
AH1-71010.10%$36,833
AH1-73435.59%$129,735

Cost Allocation details for (Pending) / WP-AF2-F-0010


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-1024.82%$943,010
AH1-14078.77%$15,403,474
AH1-2684.13%$808,320
AH1-5886.16%$1,204,823
AH1-5896.11%$1,195,598

Cost Allocation details for n6183


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17611.15%$4,121,135
AG2-42911.35%$4,194,031
AG2-4566.25%$2,308,687
AG2-4576.25%$2,308,687
AH1-0503.72%$1,375,976
AH1-0512.23%$825,404
AH1-1583.19%$1,178,114
AH1-3571.56%$577,285
AH1-3581.82%$671,009
AH1-3591.56%$577,285
AH1-3601.82%$671,009
AH1-58714.90%$5,506,619
AH1-58818.75%$6,926,513
AH1-58915.44%$5,704,933

Cost Allocation details for n7164.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.88%$3,384,815
AG2-42912.32%$3,236,913
AG2-4564.89%$1,284,022
AG2-4574.89%$1,284,022
AH1-0504.64%$1,219,269
AH1-0512.78%$731,414
AH1-1023.51%$923,466
AH1-1583.24%$850,619
AH1-2681.50%$392,933
AH1-3135.11%$1,342,153
AH1-3571.22%$321,067
AH1-3581.42%$373,311
AH1-3591.22%$321,067
AH1-3601.42%$373,311
AH1-58712.23%$3,212,631
AH1-58814.66%$3,852,066
AH1-58912.08%$3,172,896

Cost Allocation details for n7165.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17611.82%$50,539
AG2-42914.61%$62,471
AG2-4565.64%$24,102
AG2-4575.64%$24,102
AH1-0504.49%$19,181
AH1-0512.69%$11,511
AH1-1583.82%$16,338
AH1-3571.41%$6,026
AH1-3581.64%$7,005
AH1-3591.41%$6,026
AH1-3601.64%$7,005
AH1-58714.35%$61,366
AH1-58816.91%$72,300
AH1-58913.93%$59,546

Cost Allocation details for n7165.2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17611.82%$2,486,603
AG2-42914.61%$3,073,666
AG2-4565.64%$1,185,861
AG2-4575.64%$1,185,861
AH1-0504.49%$943,748
AH1-0512.69%$566,372
AH1-1583.82%$803,853
AH1-3571.41%$296,465
AH1-3581.64%$344,641
AH1-3591.41%$296,465
AH1-3601.64%$344,641
AH1-58714.35%$3,019,314
AH1-58816.91%$3,557,275
AH1-58913.93%$2,929,757

Cost Allocation details for n7166.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17611.82%$109,103
AG2-42914.61%$134,878
AG2-4565.64%$52,024
AG2-4575.64%$52,024
AH1-0504.49%$41,413
AH1-0512.69%$24,840
AH1-1583.82%$35,274
AH1-3571.41%$13,009
AH1-3581.64%$15,123
AH1-3591.41%$13,009
AH1-3601.64%$15,123
AH1-58714.35%$132,465
AH1-58816.91%$156,072
AH1-58913.93%$128,549

Cost Allocation details for n7166.2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17611.82%$3,107,204
AG2-42914.61%$3,841,262
AG2-4565.64%$1,481,624
AG2-4575.64%$1,481,624
AH1-0504.49%$1,179,433
AH1-0512.69%$707,428
AH1-1583.82%$1,004,602
AH1-3571.41%$370,503
AH1-3581.64%$430,709
AH1-3591.41%$370,503
AH1-3601.64%$430,709
AH1-58714.35%$3,772,565
AH1-58816.91%$4,444,873
AH1-58913.93%$3,661,028

Cost Allocation details for n7171.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17611.15%$1,702,000
AG2-42911.35%$1,732,105
AG2-4566.25%$953,471
AG2-4576.25%$953,471
AH1-0503.72%$568,268
AH1-0512.23%$340,886
AH1-1583.19%$486,553
AH1-3571.56%$238,415
AH1-3581.82%$277,122
AH1-3591.56%$238,415
AH1-3601.82%$277,122
AH1-58714.90%$2,274,195
AH1-58818.75%$2,860,601
AH1-58915.44%$2,356,097

Cost Allocation details for n7191.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-41112.33%$982,690
AH1-20110.55%$840,851
AH1-20322.23%$1,772,272
AH1-20519.53%$1,557,191
AH1-46015.17%$1,209,740
AH1-58811.08%$883,010
AH1-5899.12%$727,237

Cost Allocation details for n7518


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-42666.67%$11,500,869
AH1-426A33.33%$5,750,435

Cost Allocation details for n9160.0 / TC1-PH1-077


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-65869.84%$26,603,473
AH1-42620.11%$7,660,626
AH1-426A10.05%$3,830,313

Cost Allocation details for n9240.0 / TC1-APS-002.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.58%$45,844
AG2-4299.80%$35,728
AG2-4566.19%$22,571
AG2-4576.19%$22,571
AH1-0503.97%$14,486
AH1-0512.38%$8,691
AH1-1582.77%$10,107
AH1-3571.55%$5,645
AH1-3581.80%$6,562
AH1-3591.55%$5,645
AH1-3601.80%$6,562
AH1-58715.54%$56,659
AH1-58818.57%$67,716
AH1-58915.30%$55,776

Cost Allocation details for n9241.0 / TC1-APS-002.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17612.58%$64,120
AG2-4299.80%$49,971
AG2-4566.19%$31,568
AG2-4576.19%$31,568
AH1-0503.97%$20,261
AH1-0512.38%$12,155
AH1-1582.77%$14,136
AH1-3571.55%$7,895
AH1-3581.80%$9,177
AH1-3591.55%$7,895
AH1-3601.80%$9,177
AH1-58715.54%$79,246
AH1-58818.57%$94,712
AH1-58915.30%$78,012

Cost Allocation details for (Pending) / TC2-ATSI-001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$7,382,665

Cost Allocation details for (Pending) / TC2-ATSI-002.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$33,696
AG2-1494.04%$44,435
AG2-1651.51%$16,642
AG2-2121.51%$16,642
AG2-3281.51%$16,642
AG2-3631.78%$19,609
AG2-3641.19%$13,073
AG2-6600.20%$2,187
AH1-0441.19%$13,121
AH1-1501.19%$13,121
AH1-1511.19%$13,121
AH1-69073.92%$812,704
AH1-7117.68%$84,407

Cost Allocation details for (Pending) / TC2-ATSI-002.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$40,584
AG2-1494.04%$53,518
AG2-1651.51%$20,044
AG2-2121.51%$20,044
AG2-3281.51%$20,044
AG2-3631.78%$23,617
AG2-3641.19%$15,746
AG2-6600.20%$2,634
AH1-0441.19%$15,803
AH1-1501.19%$15,803
AH1-1511.19%$15,803
AH1-69073.92%$978,827
AH1-7117.68%$101,661

Cost Allocation details for (Pending) / TC2-ATSI-002.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$7,900
AG2-1494.04%$10,418
AG2-1651.51%$3,902
AG2-2121.51%$3,902
AG2-3281.51%$3,902
AG2-3631.78%$4,597
AG2-3641.19%$3,065
AG2-6600.20%$513
AH1-0441.19%$3,076
AH1-1501.19%$3,076
AH1-1511.19%$3,076
AH1-69073.92%$190,544
AH1-7117.68%$19,790

Cost Allocation details for (Pending) / TC2-ATSI-002.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$3,726,804
AG2-1494.04%$4,914,548
AG2-1651.51%$1,840,616
AG2-2121.51%$1,840,616
AG2-3281.51%$1,840,616
AG2-3631.78%$2,168,781
AG2-3641.19%$1,445,922
AG2-6600.20%$241,903
AH1-0441.19%$1,451,212
AH1-1501.19%$1,451,212
AH1-1511.19%$1,451,212
AH1-69073.92%$89,885,811
AH1-7117.68%$9,335,525

Cost Allocation details for (Pending) / TC2-ATSI-002.e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$7,900
AG2-1494.04%$10,418
AG2-1651.51%$3,902
AG2-2121.51%$3,902
AG2-3281.51%$3,902
AG2-3631.78%$4,597
AG2-3641.19%$3,065
AG2-6600.20%$513
AH1-0441.19%$3,076
AH1-1501.19%$3,076
AH1-1511.19%$3,076
AH1-69073.92%$190,544
AH1-7117.68%$19,790

Cost Allocation details for (Pending) / TC2-ATSI-002.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$37,260
AG2-1494.04%$49,135
AG2-1651.51%$18,402
AG2-2121.51%$18,402
AG2-3281.51%$18,402
AG2-3631.78%$21,683
AG2-3641.19%$14,456
AG2-6600.20%$2,419
AH1-0441.19%$14,509
AH1-1501.19%$14,509
AH1-1511.19%$14,509
AH1-69073.92%$898,671
AH1-7117.68%$93,336

Cost Allocation details for (Pending) / TC2-ATSI-002.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$238,661
AG2-1494.04%$314,723
AG2-1651.51%$117,871
AG2-2121.51%$117,871
AG2-3281.51%$117,871
AG2-3631.78%$138,887
AG2-3641.19%$92,595
AG2-6600.20%$15,491
AH1-0441.19%$92,934
AH1-1501.19%$92,934
AH1-1511.19%$92,934
AH1-69073.92%$5,756,196
AH1-7117.68%$597,838

Cost Allocation details for (Pending) / TC2-ATSI-002.h


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$6,471
AG2-1494.04%$8,533
AG2-1651.51%$3,196
AG2-2121.51%$3,196
AG2-3281.51%$3,196
AG2-3631.78%$3,766
AG2-3641.19%$2,510
AG2-6600.20%$420
AH1-0441.19%$2,520
AH1-1501.19%$2,520
AH1-1511.19%$2,520
AH1-69073.92%$156,064
AH1-7117.68%$16,209

Cost Allocation details for (Pending) / TC2-ATSI-002.i


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$21,833
AG2-1494.04%$28,792
AG2-1651.51%$10,783
AG2-2121.51%$10,783
AG2-3281.51%$10,783
AG2-3631.78%$12,706
AG2-3641.19%$8,471
AG2-6600.20%$1,417
AH1-0441.19%$8,502
AH1-1501.19%$8,502
AH1-1511.19%$8,502
AH1-69073.92%$526,591
AH1-7117.68%$54,692

Cost Allocation details for (Pending) / TC2-ATSI-002.j


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$12,072
AG2-1494.04%$15,919
AG2-1651.51%$5,962
AG2-2121.51%$5,962
AG2-3281.51%$5,962
AG2-3631.78%$7,025
AG2-3641.19%$4,684
AG2-6600.20%$784
AH1-0441.19%$4,701
AH1-1501.19%$4,701
AH1-1511.19%$4,701
AH1-69073.92%$291,159
AH1-7117.68%$30,240

Cost Allocation details for (Pending) / TC2-ATSI-002.k


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.06%$30,614
AG2-1494.04%$40,370
AG2-1651.51%$15,120
AG2-2121.51%$15,120
AG2-3281.51%$15,120
AG2-3631.78%$17,815
AG2-3641.19%$11,877
AG2-6600.20%$1,987
AH1-0441.19%$11,921
AH1-1501.19%$11,921
AH1-1511.19%$11,921
AH1-69073.92%$738,363
AH1-7117.68%$76,686

Cost Allocation details for (Pending) / TC2-ATSI-002.l


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.29%$8,104
AG2-1494.33%$10,686
AG2-1651.62%$4,002
AG2-2121.62%$4,002
AG2-3281.62%$4,002
AH1-69079.28%$195,449
AH1-7118.23%$20,299

Cost Allocation details for (Pending) / TC2-ATSI-002.m


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.29%$116,491
AG2-1494.33%$153,617
AG2-1651.62%$57,533
AG2-2121.62%$57,533
AG2-3281.62%$57,533
AH1-69079.28%$2,809,622
AH1-7118.23%$291,807

Cost Allocation details for (Pending) / TC2-ATSI-003


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$42,140,488

Cost Allocation details for (Pending) / TC2-ATSI-004.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1497.41%$68,868
AH1-69078.23%$727,201
AH1-71114.36%$133,446

Cost Allocation details for (Pending) / TC2-ATSI-004.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1497.41%$19,498
AH1-69078.23%$205,889
AH1-71114.36%$37,782

Cost Allocation details for (Pending) / TC2-ATSI-004.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1497.41%$8,091,541
AH1-69078.23%$85,440,891
AH1-71114.36%$15,678,976

Cost Allocation details for (Pending) / TC2-ATSI-004.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1497.41%$19,649
AH1-69078.23%$207,485
AH1-71114.36%$38,075

Cost Allocation details for (Pending) / TC2-ATSI-005.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1497.45%$100,649
AH1-69078.20%$1,056,291
AH1-71114.35%$193,848

Cost Allocation details for (Pending) / TC2-ATSI-005.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1497.16%$57,986
AH1-69078.47%$635,147
AH1-71114.37%$116,332

Cost Allocation details for (Pending) / TC2-ATSI-005.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1497.16%$3,585,590
AH1-69078.47%$39,274,455
AH1-71114.37%$7,193,400

Cost Allocation details for (Pending) / TC2-ATSI-005c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1497.16%$13,690
AH1-69078.47%$149,954
AH1-71114.37%$27,465

Cost Allocation details for (Pending) / TC2-ATSI-006.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$9,354,606
AG2-1651.87%$3,373,039
AG2-2121.87%$3,373,039
AG2-3281.87%$3,373,039
AG2-6600.24%$427,374
AH1-0441.43%$2,563,827
AH1-1501.43%$2,563,827
AH1-1511.43%$2,563,827
AH1-69071.19%$128,073,552
AH1-71113.48%$24,250,037

Cost Allocation details for (Pending) / TC2-ATSI-006.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$14,770
AG2-1651.87%$5,326
AG2-2121.87%$5,326
AG2-3281.87%$5,326
AG2-6600.24%$675
AH1-0441.43%$4,048
AH1-1501.43%$4,048
AH1-1511.43%$4,048
AH1-69071.19%$202,209
AH1-71113.48%$38,287

Cost Allocation details for (Pending) / TC2-ATSI-006.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$63,209
AG2-1651.87%$22,792
AG2-2121.87%$22,792
AG2-3281.87%$22,792
AG2-6600.24%$2,888
AH1-0441.43%$17,324
AH1-1501.43%$17,324
AH1-1511.43%$17,324
AH1-69071.19%$865,394
AH1-71113.48%$163,858

Cost Allocation details for (Pending) / TC2-ATSI-006.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$202,435
AG2-1651.87%$72,993
AG2-2121.87%$72,993
AG2-3281.87%$72,993
AG2-6600.24%$9,248
AH1-0441.43%$55,481
AH1-1501.43%$55,481
AH1-1511.43%$55,481
AH1-69071.19%$2,771,525
AH1-71113.48%$524,773

Cost Allocation details for (Pending) / TC2-ATSI-006.e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$65,440
AG2-1651.87%$23,596
AG2-2121.87%$23,596
AG2-3281.87%$23,596
AG2-6600.24%$2,990
AH1-0441.43%$17,935
AH1-1501.43%$17,935
AH1-1511.43%$17,935
AH1-69071.19%$895,933
AH1-71113.48%$169,640

Cost Allocation details for (Pending) / TC2-ATSI-006.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$15,866
AG2-1651.87%$5,721
AG2-2121.87%$5,721
AG2-3281.87%$5,721
AG2-6600.24%$725
AH1-0441.43%$4,348
AH1-1501.43%$4,348
AH1-1511.43%$4,348
AH1-69071.19%$217,221
AH1-71113.48%$41,130

Cost Allocation details for (Pending) / TC2-ATSI-006.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$202,435
AG2-1651.87%$72,993
AG2-2121.87%$72,993
AG2-3281.87%$72,993
AG2-6600.24%$9,248
AH1-0441.43%$55,481
AH1-1501.43%$55,481
AH1-1511.43%$55,481
AH1-69071.19%$2,771,525
AH1-71113.48%$524,773

Cost Allocation details for (Pending) / TC2-ATSI-006.h


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$44,323
AG2-1651.87%$15,982
AG2-2121.87%$15,982
AG2-3281.87%$15,982
AG2-6600.24%$2,025
AH1-0441.43%$12,148
AH1-1501.43%$12,148
AH1-1511.43%$12,148
AH1-69071.19%$606,826
AH1-71113.48%$114,899

Cost Allocation details for (Pending) / TC2-ATSI-006.i


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$53,023
AG2-1651.87%$19,119
AG2-2121.87%$19,119
AG2-3281.87%$19,119
AG2-6600.24%$2,422
AH1-0441.43%$14,532
AH1-1501.43%$14,532
AH1-1511.43%$14,532
AH1-69071.19%$725,939
AH1-71113.48%$137,453

Cost Allocation details for (Pending) / TC2-ATSI-006.j


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.20%$235,316
AG2-1651.87%$84,849
AG2-2121.87%$84,849
AG2-3281.87%$84,849
AG2-6600.24%$10,751
AH1-0441.43%$64,493
AH1-1501.43%$64,493
AH1-1511.43%$64,493
AH1-69071.19%$3,221,706
AH1-71113.48%$610,013

Cost Allocation details for (Pending) / TC2-ATSI-006.k


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.45%$46,558
AG2-1651.96%$16,788
AG2-2121.96%$16,788
AG2-3281.96%$16,788
AH1-69074.55%$637,420
AH1-71114.12%$120,692

Cost Allocation details for (Pending) / TC2-ATSI-008.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$54,846
AG2-1652.02%$19,549
AG2-2122.02%$19,549
AG2-3282.02%$19,549
AH1-69074.13%$717,344
AH1-71114.14%$136,879

Cost Allocation details for (Pending) / TC2-ATSI-008.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$14,915
AG2-1652.02%$5,316
AG2-2122.02%$5,316
AG2-3282.02%$5,316
AH1-69074.13%$195,081
AH1-71114.14%$37,224

Cost Allocation details for (Pending) / TC2-ATSI-008.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$5,201,428
AG2-1652.02%$1,853,953
AG2-2122.02%$1,853,953
AG2-3282.02%$1,853,953
AH1-69074.13%$68,030,782
AH1-71114.14%$12,981,188

Cost Allocation details for (Pending) / TC2-ATSI-008.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$14,915
AG2-1652.02%$5,316
AG2-2122.02%$5,316
AG2-3282.02%$5,316
AH1-69074.13%$195,081
AH1-71114.14%$37,224

Cost Allocation details for (Pending) / TC2-ATSI-008.e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$11,199
AG2-1652.02%$3,992
AG2-2122.02%$3,992
AG2-3282.02%$3,992
AH1-69074.13%$146,470
AH1-71114.14%$27,948

Cost Allocation details for (Pending) / TC2-ATSI-008.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$6,337,596
AG2-1652.02%$2,258,920
AG2-2122.02%$2,258,920
AG2-3282.02%$2,258,920
AH1-69074.13%$82,891,012
AH1-71114.14%$15,816,720

Cost Allocation details for (Pending) / TC2-ATSI-008.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$35,173
AG2-1652.02%$12,537
AG2-2122.02%$12,537
AG2-3282.02%$12,537
AH1-69074.13%$460,035
AH1-71114.14%$87,781

Cost Allocation details for (Pending) / TC2-ATSI-008.h


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$117,254
AG2-1652.02%$41,793
AG2-2122.02%$41,793
AG2-3282.02%$41,793
AH1-69074.13%$1,533,593
AH1-71114.14%$292,630

Cost Allocation details for (Pending) / TC2-ATSI-008.i


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$42,859
AG2-1652.02%$15,276
AG2-2122.02%$15,276
AG2-3282.02%$15,276
AH1-69074.13%$560,559
AH1-71114.14%$106,962

Cost Allocation details for (Pending) / TC2-ATSI-008.j


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$28,899
AG2-1652.02%$10,300
AG2-2122.02%$10,300
AG2-3282.02%$10,300
AH1-69074.13%$377,973
AH1-71114.14%$72,122

Cost Allocation details for (Pending) / TC2-ATSI-008.k


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$28,899
AG2-1652.02%$10,300
AG2-2122.02%$10,300
AG2-3282.02%$10,300
AH1-69074.13%$377,973
AH1-71114.14%$72,122

Cost Allocation details for (Pending) / TC2-ATSI-008.l


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$117,254
AG2-1652.02%$41,793
AG2-2122.02%$41,793
AG2-3282.02%$41,793
AH1-69074.13%$1,533,593
AH1-71114.14%$292,630

Cost Allocation details for (Pending) / TC2-ATSI-008.m


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.67%$28,899
AG2-1652.02%$10,300
AG2-2122.02%$10,300
AG2-3282.02%$10,300
AH1-69074.13%$377,973
AH1-71114.14%$72,122

Cost Allocation details for (Pending) / TC2-ATSI-010


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$591,862

Cost Allocation details for (Pending) / TC2-ATSI-014.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$10,237,972
AG2-1652.00%$3,519,183
AG2-2122.00%$3,519,183
AG2-3282.00%$3,519,183
AG2-6600.25%$446,130
AH1-0441.52%$2,675,499
AH1-1501.52%$2,675,499
AH1-1511.52%$2,675,499
AH1-69069.81%$122,797,286
AH1-71113.55%$23,837,042

Cost Allocation details for (Pending) / TC2-ATSI-014.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$8,880
AG2-1652.00%$3,052
AG2-2122.00%$3,052
AG2-3282.00%$3,052
AG2-6600.25%$387
AH1-0441.52%$2,321
AH1-1501.52%$2,321
AH1-1511.52%$2,321
AH1-69069.81%$106,511
AH1-71113.55%$20,676

Cost Allocation details for (Pending) / TC2-ATSI-014.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$42,437
AG2-1652.00%$14,587
AG2-2122.00%$14,587
AG2-3282.00%$14,587
AG2-6600.25%$1,849
AH1-0441.52%$11,090
AH1-1501.52%$11,090
AH1-1511.52%$11,090
AH1-69069.81%$509,000
AH1-71113.55%$98,806

Cost Allocation details for (Pending) / TC2-ATSI-014.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$461,984
AG2-1652.00%$158,802
AG2-2122.00%$158,802
AG2-3282.00%$158,802
AG2-6600.25%$20,131
AH1-0441.52%$120,731
AH1-1501.52%$120,731
AH1-1511.52%$120,731
AH1-69069.81%$5,541,172
AH1-71113.55%$1,075,636

Cost Allocation details for (Pending) / TC2-ATSI-014.e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$8,880
AG2-1652.00%$3,052
AG2-2122.00%$3,052
AG2-3282.00%$3,052
AG2-6600.25%$387
AH1-0441.52%$2,321
AH1-1501.52%$2,321
AH1-1511.52%$2,321
AH1-69069.81%$106,511
AH1-71113.55%$20,676

Cost Allocation details for (Pending) / TC2-ATSI-014.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$42,331
AG2-1652.00%$14,551
AG2-2122.00%$14,551
AG2-3282.00%$14,551
AG2-6600.25%$1,845
AH1-0441.52%$11,062
AH1-1501.52%$11,062
AH1-1511.52%$11,062
AH1-69069.81%$507,727
AH1-71113.55%$98,558

Cost Allocation details for (Pending) / TC2-ATSI-014.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$34,448
AG2-1652.00%$11,841
AG2-2122.00%$11,841
AG2-3282.00%$11,841
AG2-6600.25%$1,501
AH1-0441.52%$9,002
AH1-1501.52%$9,002
AH1-1511.52%$9,002
AH1-69069.81%$413,179
AH1-71113.55%$80,205

Cost Allocation details for (Pending) / TC2-ATSI-014.h


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$73,253
AG2-1652.00%$25,180
AG2-2122.00%$25,180
AG2-3282.00%$25,180
AG2-6600.25%$3,192
AH1-0441.52%$19,143
AH1-1501.52%$19,143
AH1-1511.52%$19,143
AH1-69069.81%$878,624
AH1-71113.55%$170,556

Cost Allocation details for (Pending) / TC2-ATSI-014.i


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$29,677
AG2-1652.00%$10,201
AG2-2122.00%$10,201
AG2-3282.00%$10,201
AG2-6600.25%$1,293
AH1-0441.52%$7,756
AH1-1501.52%$7,756
AH1-1511.52%$7,756
AH1-69069.81%$355,957
AH1-71113.55%$69,097

Cost Allocation details for (Pending) / TC2-ATSI-014.j


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1495.82%$59,354
AG2-1652.00%$20,402
AG2-2122.00%$20,402
AG2-3282.00%$20,402
AG2-6600.25%$2,586
AH1-0441.52%$15,511
AH1-1501.52%$15,511
AH1-1511.52%$15,511
AH1-69069.81%$711,914
AH1-71113.55%$138,195

Cost Allocation details for (Pending) / TC2-ATSI-014.k


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.11%$230,820
AG2-1652.10%$79,342
AG2-2122.10%$79,342
AG2-3282.10%$79,342
AH1-69073.34%$2,768,527
AH1-71114.24%$537,418

Cost Allocation details for (Pending) / TC2-ATSI-015.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.54%$5,726,959
AG2-1496.10%$7,692,075
AG2-1652.15%$2,716,066
AG2-2122.15%$2,716,066
AG2-3282.15%$2,716,066
AG2-5154.77%$6,022,672
AG2-6600.28%$356,864
AH1-0441.70%$2,142,071
AH1-1501.70%$2,142,071
AH1-1511.70%$2,142,071
AH1-69054.01%$68,126,768
AH1-71118.74%$23,632,200

Cost Allocation details for (Pending) / TC2-ATSI-015.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.54%$51,429
AG2-1496.10%$69,075
AG2-1652.15%$24,390
AG2-2122.15%$24,390
AG2-3282.15%$24,390
AG2-5154.77%$54,084
AG2-6600.28%$3,205
AH1-0441.70%$19,236
AH1-1501.70%$19,236
AH1-1511.70%$19,236
AH1-69054.01%$611,784
AH1-71118.74%$212,219

Cost Allocation details for (Pending) / TC2-ATSI-015.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.80%$286,099
AG2-1496.45%$384,270
AG2-1652.28%$135,685
AG2-2122.28%$135,685
AG2-3282.28%$135,685
AG2-5155.05%$300,872
AH1-69057.08%$3,403,380
AH1-71119.80%$1,180,584

Cost Allocation details for (Pending) / TC2-ATSI-015.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.80%$99,376
AG2-1496.45%$133,476
AG2-1652.28%$47,130
AG2-2122.28%$47,130
AG2-3282.28%$47,130
AG2-5155.05%$104,507
AH1-69057.08%$1,182,159
AH1-71119.80%$410,074

Cost Allocation details for (Pending) / TC2-ATSI-015.e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.80%$48,935
AG2-1496.45%$65,726
AG2-1652.28%$23,208
AG2-2122.28%$23,208
AG2-3282.28%$23,208
AG2-5155.05%$51,461
AH1-69057.08%$582,117
AH1-71119.80%$201,928

Cost Allocation details for (Pending) / TC2-ATSI-015.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.80%$99,274
AG2-1496.45%$133,338
AG2-1652.28%$47,082
AG2-2122.28%$47,082
AG2-3282.28%$47,082
AG2-5155.05%$104,400
AH1-69057.08%$1,180,945
AH1-71119.80%$409,653

Cost Allocation details for (Pending) / TC2-ATSI-015.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.80%$102,564
AG2-1496.45%$137,758
AG2-1652.28%$48,642
AG2-2122.28%$48,642
AG2-3282.28%$48,642
AG2-5155.05%$107,860
AH1-69057.08%$1,220,083
AH1-71119.80%$423,229

Cost Allocation details for (Pending) / TC2-ATSI-015.h


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.80%$46,128
AG2-1496.45%$61,956
AG2-1652.28%$21,877
AG2-2122.28%$21,877
AG2-3282.28%$21,877
AG2-5155.05%$48,510
AH1-69057.08%$548,730
AH1-71119.80%$190,346

Cost Allocation details for (Pending) / TC2-ATSI-015.i


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.80%$189,671
AG2-1496.45%$254,753
AG2-1652.28%$89,953
AG2-2122.28%$89,953
AG2-3282.28%$89,953
AG2-5155.05%$199,465
AH1-69057.08%$2,256,287
AH1-71119.80%$782,674

Cost Allocation details for (Pending) / TC2-ATSI-016.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.84%$25,455
AH1-69080.00%$421,055
AH1-71115.17%$79,829

Cost Allocation details for (Pending) / TC2-ATSI-016.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.84%$32,519
AH1-69080.00%$537,901
AH1-71115.17%$101,982

Cost Allocation details for (Pending) / TC2-ATSI-016.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.84%$1,860,168
AH1-69080.00%$30,769,431
AH1-71115.17%$5,833,648

Cost Allocation details for (Pending) / TC2-ATSI-016.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.84%$16,312
AH1-69080.00%$269,825
AH1-71115.17%$51,157

Cost Allocation details for (Pending) / TC2-ATSI-017


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-690100.00%$948,616

Cost Allocation details for (Pending) / TC2-ATSI-019


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-14929.75%$184,641
AG2-32913.49%$83,732
AH1-69047.03%$291,889
AH1-7119.72%$60,337

Cost Allocation details for (Pending) / TC2-ATSI-020.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.07%$158,348
AG2-1495.75%$223,755
AG2-1651.99%$77,540
AG2-2121.99%$77,540
AG2-3281.99%$77,540
AH1-69070.60%$2,748,721
AH1-71113.61%$529,961

Cost Allocation details for (Pending) / TC2-ATSI-020.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.91%$66,391
AG2-1495.44%$92,436
AG2-1651.94%$32,895
AG2-2121.94%$32,895
AG2-3281.94%$32,895
AH1-69071.25%$1,211,059
AH1-71113.60%$231,070

Cost Allocation details for (Pending) / TC2-ATSI-020.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.91%$7,322
AG2-1495.44%$10,195
AG2-1651.94%$3,628
AG2-2121.94%$3,628
AG2-3281.94%$3,628
AH1-69071.25%$133,565
AH1-71113.60%$25,484

Cost Allocation details for (Pending) / TC2-ATSI-020.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.91%$5,835,961
AG2-1495.44%$8,125,408
AG2-1651.94%$2,891,547
AG2-2121.94%$2,891,547
AG2-3281.94%$2,891,547
AH1-69071.25%$106,455,624
AH1-71113.60%$20,311,685

Cost Allocation details for (Pending) / TC2-ATSI-020.e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0294.07%$25,240
AG2-1495.75%$35,666
AG2-1651.99%$12,360
AG2-2121.99%$12,360
AG2-3281.99%$12,360
AH1-69070.60%$438,140
AH1-71113.61%$84,475

Cost Allocation details for (Pending) / TC2-ATSI-020.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.91%$19,917
AG2-1495.44%$27,731
AG2-1651.94%$9,868
AG2-2121.94%$9,868
AG2-3281.94%$9,868
AH1-69071.25%$363,320
AH1-71113.60%$69,321

Cost Allocation details for (Pending) / TC2-ATSI-020.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.91%$49,163
AG2-1495.44%$68,450
AG2-1651.94%$24,359
AG2-2121.94%$24,359
AG2-3281.94%$24,359
AH1-69071.25%$896,798
AH1-71113.60%$171,109

Cost Allocation details for (Pending) / TC2-ATSI-020.h


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.91%$13,670
AG2-1495.44%$19,032
AG2-1651.94%$6,773
AG2-2121.94%$6,773
AG2-3281.94%$6,773
AH1-69071.25%$249,354
AH1-71113.60%$47,577

Cost Allocation details for (Pending) / TC2-ATSI-020.i


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.91%$19,917
AG2-1495.44%$27,731
AG2-1651.94%$9,868
AG2-2121.94%$9,868
AG2-3281.94%$9,868
AH1-69071.25%$363,320
AH1-71113.60%$69,321

Cost Allocation details for (Pending) / TC2-ATSI-020.j


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0293.91%$19,917
AG2-1495.44%$27,731
AG2-1651.94%$9,868
AG2-2121.94%$9,868
AG2-3281.94%$9,868
AH1-69071.25%$363,320
AH1-71113.60%$69,321

Cost Allocation details for (Pending) / TC2-ATSI-021.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$540,728
AG2-1652.19%$170,330
AG2-2122.19%$170,330
AG2-3282.19%$170,330
AH1-69073.08%$5,690,758
AH1-71113.41%$1,044,335

Cost Allocation details for (Pending) / TC2-ATSI-021.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$21,217
AG2-1652.19%$6,683
AG2-2122.19%$6,683
AG2-3282.19%$6,683
AH1-69073.08%$223,295
AH1-71113.41%$40,978

Cost Allocation details for (Pending) / TC2-ATSI-021.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$59,293
AG2-1652.19%$18,677
AG2-2122.19%$18,677
AG2-3282.19%$18,677
AH1-69073.08%$624,011
AH1-71113.41%$114,515

Cost Allocation details for (Pending) / TC2-ATSI-021.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$47,962
AG2-1652.19%$15,108
AG2-2122.19%$15,108
AG2-3282.19%$15,108
AH1-69073.08%$504,767
AH1-71113.41%$92,632

Cost Allocation details for (Pending) / TC2-ATSI-021.e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$24,301
AG2-1652.19%$7,655
AG2-2122.19%$7,655
AG2-3282.19%$7,655
AH1-69073.08%$255,752
AH1-71113.41%$46,934

Cost Allocation details for (Pending) / TC2-ATSI-021.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$35,408
AG2-1652.19%$11,153
AG2-2122.19%$11,153
AG2-3282.19%$11,153
AH1-69073.08%$372,642
AH1-71113.41%$68,385

Cost Allocation details for (Pending) / TC2-ATSI-021.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$12,367
AG2-1652.19%$3,896
AG2-2122.19%$3,896
AG2-3282.19%$3,896
AH1-69073.08%$130,151
AH1-71113.41%$23,885

Cost Allocation details for (Pending) / TC2-ATSI-021.h


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$267,405
AG2-1652.19%$84,233
AG2-2122.19%$84,233
AG2-3282.19%$84,233
AH1-69073.08%$2,814,238
AH1-71113.41%$516,453

Cost Allocation details for (Pending) / TC2-ATSI-021.i


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$35,408
AG2-1652.19%$11,153
AG2-2122.19%$11,153
AG2-3282.19%$11,153
AH1-69073.08%$372,642
AH1-71113.41%$68,385

Cost Allocation details for (Pending) / TC2-ATSI-021.j


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$12,041
AG2-1652.19%$3,793
AG2-2122.19%$3,793
AG2-3282.19%$3,793
AH1-69073.08%$126,718
AH1-71113.41%$23,254

Cost Allocation details for (Pending) / TC2-ATSI-021.k


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$187,576
AG2-1652.19%$59,087
AG2-2122.19%$59,087
AG2-3282.19%$59,087
AH1-69073.08%$1,974,100
AH1-71113.41%$362,275

Cost Allocation details for (Pending) / TC2-ATSI-021.l


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$35,408
AG2-1652.19%$11,153
AG2-2122.19%$11,153
AG2-3282.19%$11,153
AH1-69073.08%$372,642
AH1-71113.41%$68,385

Cost Allocation details for (Pending) / TC2-ATSI-021.m


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$17,363
AG2-1652.19%$5,469
AG2-2122.19%$5,469
AG2-3282.19%$5,469
AH1-69073.08%$182,734
AH1-71113.41%$33,534

Cost Allocation details for (Pending) / TC2-ATSI-023.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.84%$25,455
AH1-69080.00%$421,055
AH1-71115.17%$79,829

Cost Allocation details for (Pending) / TC2-ATSI.023.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.84%$24,660
AH1-69080.00%$407,901
AH1-71115.17%$77,335

Cost Allocation details for (Pending) / TC2-ATSI.023.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.84%$10,588
AH1-69080.00%$175,138
AH1-71115.17%$33,205

Cost Allocation details for n6511


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5154.83%$204,919
AH1-69078.99%$3,347,779
AH1-71116.18%$685,786

Cost Allocation details for n9227.0 / TC1-ATSI-001.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1496.94%$3,393,878
AG2-1652.19%$1,069,072
AG2-2122.19%$1,069,072
AG2-3282.19%$1,069,072
AH1-69073.08%$35,718,003
AH1-71113.41%$6,554,759

Cost Allocation details for (Pending) / CE_NUN_COLLINS_TR


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36313.26%$2,068,748
AG2-3648.84%$1,379,165
AG2-45311.48%$1,790,407
AG2-6601.04%$161,901
AH1-0448.92%$1,392,229
AH1-1469.22%$1,437,690
AH1-1479.22%$1,437,690
AH1-1508.92%$1,392,229
AH1-1518.92%$1,392,229
AH1-2349.96%$1,553,085
AH1-54310.22%$1,594,627

Cost Allocation details for (Pending) / CE_NUN_L0627.3


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-6603.73%$1,149,257
AH1-04432.09%$9,883,581
AH1-15032.09%$9,883,581
AH1-15132.09%$9,883,581

Cost Allocation details for (Pending) / CE_NUN_L11103_1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-563100.00%$2,600,000

Cost Allocation details for (Pending) / CE_NUN_L11104-1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-57543.06%$258,353
AH1-28520.05%$120,327
AH1-33831.08%$186,480
AH1-3415.81%$34,839

Cost Allocation details for (Pending) / CE_NUN_L11301_1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-57533.60%$3,259,051
AG2-6600.70%$67,470
AH1-0445.99%$580,562
AH1-1505.99%$580,562
AH1-1515.99%$580,562
AH1-33839.37%$3,819,213
AH1-3418.38%$812,580

Cost Allocation details for (Pending) / CE_NUN_L1205-1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-524100.00%$2,800,000

Cost Allocation details for (Pending) / CE_NUN_L14609_1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-57526.97%$674,276
AH1-28534.70%$867,437
AH1-33831.61%$790,169
AH1-3416.72%$168,117

Cost Allocation details for (Pending) / CE_NUN_L17705_1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36312.94%$1,811,230
AG2-3648.62%$1,207,430
AG2-45313.51%$1,891,460
AG2-6601.04%$145,328
AH1-0448.93%$1,249,617
AH1-1469.05%$1,267,455
AH1-1479.05%$1,267,455
AH1-1508.93%$1,249,617
AH1-1518.93%$1,249,617
AH1-2349.83%$1,376,514
AH1-7149.17%$1,284,279

Cost Allocation details for (Pending) / CE_NUN_L18623.2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-5756.92%$588,089
AG2-6600.81%$69,239
AH1-0445.60%$475,670
AH1-1505.60%$475,670
AH1-1515.60%$475,670
AH1-33866.70%$5,669,142
AH1-3418.78%$746,520

Cost Allocation details for (Pending) / CE_NUN_L8014.3


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-11428.54%$27,967,764
AH1-54125.64%$25,124,559
AH1-67045.82%$44,907,677

Cost Allocation details for (Pending) / CE_NUN_L95201_1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-564100.00%$500,000

Cost Allocation details for (Pending) / CE_NUN_TSS 111


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-6603.23%$161,317
AH1-04432.26%$1,612,894
AH1-15032.26%$1,612,894
AH1-15132.26%$1,612,894

Cost Allocation details for (Pending) / CE_NUN_TSS155_TR83


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-6603.73%$567,029
AH1-04432.09%$4,877,657
AH1-15032.09%$4,877,657
AH1-15132.09%$4,877,657

Cost Allocation details for n5792 / CE_NUN_L11323


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-57512.27%$1,286,126
AH1-33878.34%$8,210,407
AH1-3419.38%$983,308

Cost Allocation details for n6260.3 / CE_NUN_L8012_1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-54135.98%$7,772,746
AH1-67064.02%$13,827,254

Cost Allocation details for n6779 / CE_NUN_L14609


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-57526.97%$1,510,378
AH1-28534.70%$1,943,060
AH1-33831.61%$1,769,980
AH1-3416.72%$376,583

Cost Allocation details for n7941.1 / CE_NUN_8001_1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-670100.00%$95,900,398

Cost Allocation details for n8379 / CE_NUN_L11212_NEW TR


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36312.56%$4,773,801
AG2-3648.38%$3,182,520
AG2-45313.51%$5,134,475
AG2-6601.00%$381,546
AH1-0448.63%$3,281,263
AH1-1468.74%$3,321,582
AH1-1478.74%$3,321,582
AH1-1508.63%$3,281,263
AH1-1518.63%$3,281,263
AH1-2349.49%$3,607,233
AH1-3381.80%$683,349
AH1-7149.87%$3,750,120

Cost Allocation details for n8389 / CE_N8389_116BT3-4_1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36326.63%$266,339
AG2-36417.76%$177,561
AG2-6601.25%$12,521
AH1-04410.77%$107,699
AH1-14611.02%$110,242
AH1-14711.02%$110,242
AH1-15010.77%$107,699
AH1-15110.77%$107,699

Cost Allocation details for n9678.0 / CE_NUN_L11215_1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-36311.21%$1,008,964
AG2-3647.47%$672,642
AG2-45313.64%$1,227,150
AG2-6600.95%$85,535
AH1-0448.17%$735,575
AH1-1468.26%$743,346
AH1-1478.26%$743,346
AH1-1508.17%$735,575
AH1-1518.17%$735,575
AH1-2348.91%$802,235
AH1-3387.48%$673,598
AH1-7149.29%$836,460

Cost Allocation details for (Pending) / F4504


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07257.69%$41,533,813
AG2-16514.10%$10,155,396
AG2-21214.10%$10,155,396
AG2-32814.10%$10,155,396

Cost Allocation details for n9176.0 / M240124


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-55029.14%$1,549,119
AG2-55117.34%$921,806
AG2-63753.52%$2,844,629

Cost Allocation details for n9186.0 / M240135


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0738.04%$386,145
AG2-0813.74%$179,673
AG2-15911.38%$546,422
AH1-0044.99%$239,629
AH1-66412.52%$601,333
AH1-66510.02%$481,093
AH1-66610.20%$489,742
AH1-72139.13%$1,879,485

Cost Allocation details for n9187.0 / M220257


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-55035.40%$20,673,478
AG2-63764.60%$37,733,384

Cost Allocation details for (Pending) /


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-181100.00%$1,000,000

Cost Allocation details for (Pending) /


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-181100.00%$10,000,000

Cost Allocation details for (Pending) /


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-181100.00%$500,000

Cost Allocation details for (Pending) /


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34745.63%$3,878,663
AH1-6346.91%$587,699
AH1-71047.45%$4,033,638

Cost Allocation details for (Pending) / 6704-2 Kent


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-28164.86%$129,729
AH1-53635.14%$70,271

Cost Allocation details for (Pending) / 6708-2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-181100.00%$8,080,000

Cost Allocation details for n6926 / dt22084r0001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-28112.87%$913,981
AG2-34727.15%$1,927,545
AH1-5846.88%$488,145
AH1-5856.88%$488,145
AH1-58610.31%$732,218
AH1-6343.96%$281,458
AH1-67214.34%$1,018,279
AH1-71017.61%$1,250,227

Cost Allocation details for n6927 / dt23015r0001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34739.05%$8,981,905
AH1-5849.89%$2,275,077
AH1-5859.89%$2,275,077
AH1-58614.84%$3,412,911
AH1-6345.70%$1,311,884
AH1-67220.62%$4,743,147

Cost Allocation details for n7038 / dt13703r0001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-58432.82%$28,084,358
AH1-58532.82%$28,084,358
AH1-58634.35%$29,391,283

Cost Allocation details for n7039 / ds13703r0001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-58432.82%$82,060
AH1-58532.82%$82,060
AH1-58634.35%$85,879

Cost Allocation details for n7042 / dt6704r0001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-28164.86%$4,929,705
AH1-53635.14%$2,670,295

Cost Allocation details for n7746 / ds22085r0001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34755.18%$606,982
AH1-5847.74%$85,106
AH1-5857.74%$85,106
AH1-5868.10%$89,063
AH1-6348.36%$91,962
AH1-67212.89%$141,781

Cost Allocation details for (Pending) / Dayton-TC2-18817


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0738.86%$106,368
AG2-0813.28%$39,417
AH1-0044.38%$52,552
AH1-4276.28%$75,388
AH1-66416.46%$197,560
AH1-66513.17%$158,047
AH1-66613.67%$164,023
AH1-72133.89%$406,644

Cost Allocation details for (Pending) / Dayton-TC2-18818


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0738.86%$8,864
AG2-0813.28%$3,285
AH1-0044.38%$4,379
AH1-4276.28%$6,282
AH1-66416.46%$16,463
AH1-66513.17%$13,171
AH1-66613.67%$13,669
AH1-72133.89%$33,887

Cost Allocation details for n9670.0 / DAYr190039


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0738.86%$4,431,988
AG2-0813.28%$1,642,356
AH1-0044.38%$2,189,680
AH1-4276.28%$3,141,183
AH1-66416.46%$8,231,683
AH1-66513.17%$6,585,308
AH1-66613.67%$6,834,283
AH1-72133.89%$16,943,518

Cost Allocation details for n9671.0 / DAYr190040


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0738.86%$88,640
AG2-0813.28%$32,847
AH1-0044.38%$43,794
AH1-4276.28%$62,824
AH1-66416.46%$164,634
AH1-66513.17%$131,706
AH1-66613.67%$136,686
AH1-72133.89%$338,870

Cost Allocation details for n9672.0 / DAYr190041


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0738.86%$177,280
AG2-0813.28%$65,694
AH1-0044.38%$87,587
AH1-4276.28%$125,647
AH1-66416.46%$329,267
AH1-66513.17%$263,412
AH1-66613.67%$273,371
AH1-72133.89%$677,741

Cost Allocation details for (Pending) / TC1-PH1-DOM-006


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1716.05%$665,506
AG2-2138.07%$887,405
AG2-2707.43%$816,814
AG2-34110.60%$1,165,567
AG2-4408.44%$928,289
AG2-44110.55%$1,160,313
AG2-44211.81%$1,299,585
AG2-52211.03%$1,213,328
AG2-65912.37%$1,360,337
AH1-0565.80%$637,995
AH1-4087.86%$864,862

Cost Allocation details for (Pending) / TC1-PH1-DOM-023


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$300,000

Cost Allocation details for (Pending) / TC1-PH1-DOM-024


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$400,000

Cost Allocation details for (Pending) / TC1-PH1-DOM-079


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-3381.89%$11,323
AG2-3394.72%$28,307
AG2-3692.21%$13,250
AG2-4285.49%$32,911
AG2-43618.44%$110,658
AG2-5704.30%$25,801
AG2-5711.72%$10,320
AH1-0406.02%$36,133
AH1-5288.09%$48,534
AH1-71647.13%$282,762

Cost Allocation details for (Pending) / TC1-PH1-DOM-083


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$7,936,000

Cost Allocation details for (Pending) / TC1-PH1-DOM-096


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1115.76%$516,143
AG2-1126.04%$541,145
AG2-15214.91%$1,335,495
AG2-3116.95%$622,404
AG2-54130.90%$2,768,644
AH1-34335.45%$3,176,168

Cost Allocation details for (Pending) / TC1-PH2-DOM-0012


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0774.40%$1,353,455
AG2-1518.79%$2,704,358
AG2-18810.60%$3,262,332
AG2-1983.18%$979,384
AG2-2703.60%$1,107,594
AG2-4403.26%$1,003,054
AG2-4414.07%$1,253,788
AG2-4424.56%$1,404,275
AG2-5660.80%$244,817
AG2-5813.36%$1,035,193
AH1-0564.53%$1,395,689
AH1-2174.68%$1,440,592
AH1-2418.79%$2,704,358
AH1-3776.38%$1,964,802
AH1-4396.33%$1,948,442
AH1-5286.73%$2,070,270
AH1-5467.54%$2,321,469
AH1-6878.40%$2,586,127

Cost Allocation details for (Pending) / TC1-PH3-DOM-007


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.05%$4,203
AG2-0691.58%$6,305
AG2-0772.99%$11,942
AG2-0883.93%$15,708
AG2-1515.51%$22,048
AG2-1712.07%$8,298
AG2-1887.02%$28,085
AG2-1982.44%$9,766
AG2-2131.89%$7,542
AG2-2703.66%$14,632
AG2-3380.72%$2,862
AG2-3391.79%$7,153
AG2-3690.22%$865
AG2-4281.99%$7,975
AG2-4367.21%$28,851
AG2-4402.60%$10,419
AG2-4413.26%$13,024
AG2-4423.65%$14,586
AG2-5661.51%$6,047
AG2-5701.76%$7,033
AG2-5710.70%$2,813
AG2-5811.90%$7,607
AG2-5835.91%$23,660
AH1-0563.43%$13,705
AH1-2172.89%$11,553
AH1-2415.51%$22,048
AH1-3775.14%$20,562
AH1-4394.16%$16,641
AH1-5283.49%$13,973
AH1-5464.76%$19,032
AH1-6875.27%$21,064

Cost Allocation details for (Pending) / TC2-PH1-DOM-0000


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17118.98%$75,908
AG2-21325.30%$101,210
AG2-4409.07%$36,261
AG2-44111.33%$45,326
AG2-44212.69%$50,766
AH1-05613.55%$54,203
AH1-2805.48%$21,913
AH1-3963.60%$14,413

Cost Allocation details for (Pending) / TC2-PH1-DOM-0001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17118.98%$56,931
AG2-21325.30%$75,908
AG2-4409.07%$27,195
AG2-44111.33%$33,995
AG2-44212.69%$38,075
AH1-05613.55%$40,652
AH1-2805.48%$16,434
AH1-3963.60%$10,810

Cost Allocation details for (Pending) / TC2-PH1-DOM-0002


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17118.98%$613,872
AG2-21325.30%$818,485
AG2-4409.07%$293,240
AG2-44111.33%$366,554
AG2-44212.69%$410,545
AH1-05613.55%$438,341
AH1-2805.48%$177,207
AH1-3963.60%$116,557

Cost Allocation details for (Pending) / TC2-PH1-DOM-0003


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44025.22%$100,883
AG2-44131.53%$126,103
AG2-44235.31%$141,235
AH1-2157.94%$31,778

Cost Allocation details for (Pending) / TC2-PH1-DOM-0004


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44025.22%$5,503,760
AG2-44131.53%$6,879,700
AG2-44235.31%$7,705,237
AH1-2157.94%$1,733,703

Cost Allocation details for (Pending) / TC2-PH1-DOM-0007


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44021.51%$86,021
AG2-44126.88%$107,527
AG2-44230.11%$120,430
AH1-05621.51%$86,021

Cost Allocation details for (Pending) / TC2-PH1-DOM-0008


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44021.51%$86,021
AG2-44126.88%$107,527
AG2-44230.11%$120,430
AH1-05621.51%$86,021

Cost Allocation details for (Pending) / TC2-PH1-DOM-0009


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17124.99%$39,978
AG2-21333.32%$53,304
AG2-4405.57%$8,915
AG2-4416.96%$11,144
AG2-4427.80%$12,481
AH1-0565.57%$8,915
AH1-2808.33%$13,326
AH1-3964.74%$7,591
AH1-4082.72%$4,348

Cost Allocation details for (Pending) / TC2-PH1-DOM-0010


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17124.99%$4,285,625
AG2-21333.32%$5,714,197
AG2-4405.57%$955,638
AG2-4416.96%$1,194,593
AG2-4427.80%$1,337,912
AH1-0565.57%$955,638
AH1-2808.33%$1,428,572
AH1-3964.74%$813,767
AH1-4082.72%$466,057

Cost Allocation details for (Pending) / TC2-PH1-DOM-0011


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17124.99%$99,945
AG2-21333.32%$133,260
AG2-4405.57%$22,286
AG2-4416.96%$27,859
AG2-4427.80%$31,201
AH1-0565.57%$22,286
AH1-2808.33%$33,316
AH1-3964.74%$18,978
AH1-4082.72%$10,869

Cost Allocation details for (Pending) / TC2-PH1-DOM-0013


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0773.85%$221,076
AG2-1517.70%$441,734
AG2-1889.29%$532,875
AG2-1982.79%$159,974
AG2-2703.15%$180,916
AG2-4402.86%$163,841
AG2-4413.57%$204,796
AG2-4424.00%$229,377
AG2-5660.70%$39,989
AG2-5812.95%$169,090
AG2-58312.38%$710,342
AH1-0563.97%$227,974
AH1-2174.10%$235,309
AH1-2417.70%$441,734
AH1-3775.59%$320,934
AH1-4395.55%$318,262
AH1-5285.89%$338,162
AH1-5466.61%$379,193
AH1-6877.36%$422,422

Cost Allocation details for (Pending) / TC2-PH1-DOM-0014


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0773.84%$24,815
AG2-1517.71%$49,788
AG2-1889.29%$60,040
AG2-1982.79%$18,000
AG2-2703.14%$20,299
AG2-4402.85%$18,423
AG2-4413.56%$23,029
AG2-4423.99%$25,792
AG2-5660.70%$4,501
AG2-5812.94%$18,982
AG2-58312.40%$80,094
AH1-0563.97%$25,651
AH1-2174.11%$26,520
AH1-2417.71%$49,788
AH1-3775.59%$36,094
AH1-4395.55%$35,863
AH1-5285.88%$37,959
AH1-5466.62%$42,742
AH1-6877.37%$47,619

Cost Allocation details for (Pending) / TC2-PH1-DOM-0018


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$500,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0019


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$1,520,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0020


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$2,394,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0027


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$49,590,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0028


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$2,394,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0029


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$400,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0030


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$1,000,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0031


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$500,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0032


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$400,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0033


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$400,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0034


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$2,000,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0035


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-241100.00%$1,184,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-0043


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0107.20%$990,601
AG2-64617.19%$2,364,804
AH1-0428.98%$1,235,020
AH1-15711.04%$1,518,347
AH1-71655.59%$7,647,227

Cost Allocation details for (Pending) / TC2-PH1-DOM-0044


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0687.35%$1,256,962
AG2-06911.03%$1,885,444
AG2-1529.88%$1,689,186
AG2-3696.32%$1,081,064
AG2-54110.46%$1,788,832
AG2-57029.40%$5,027,723
AG2-5713.72%$636,448
AH1-3149.98%$1,705,751
AH1-34311.86%$2,028,591

Cost Allocation details for (Pending) / TC2-PH1-DOM-0045


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.58%$498,905
AG2-0692.37%$748,333
AG2-07712.82%$4,042,771
AG2-1522.13%$670,515
AG2-1883.54%$1,116,290
AG2-1983.43%$1,082,038
AG2-2709.02%$2,844,056
AG2-3691.36%$429,050
AG2-4402.08%$656,895
AG2-4412.60%$821,143
AG2-4422.92%$919,642
AG2-5412.25%$709,124
AG2-5660.65%$205,461
AG2-5706.33%$1,995,421
AG2-5710.80%$252,582
AG2-5819.44%$2,977,307
AH1-0562.39%$754,092
AH1-3142.15%$676,925
AH1-3432.55%$804,067
AH1-3778.63%$2,722,822
AH1-4392.04%$641,972
AH1-52818.93%$5,970,589

Cost Allocation details for (Pending) / TC2-PH1-DOM-0046


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-09321.08%$5,832,804
AG2-42812.50%$3,458,340
AG2-43616.88%$4,669,857
AG2-57012.47%$3,449,986
AG2-5711.58%$436,737
AH1-2166.97%$1,929,373
AH1-3249.49%$2,624,111
AH1-5289.77%$2,702,793
AH1-7179.25%$2,559,999

Cost Allocation details for (Pending) / TC2-PH1-DOM-0047


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-09321.08%$705,064
AG2-42812.50%$418,041
AG2-43616.88%$564,488
AG2-57012.47%$417,031
AG2-5711.58%$52,792
AH1-2166.97%$233,221
AH1-3249.49%$317,200
AH1-5289.77%$326,711
AH1-7179.25%$309,450

Cost Allocation details for (Pending) / TC2-PH1-DOM-0048


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0683.45%$17,255
AG2-0695.18%$25,884
AG2-0775.98%$29,905
AG2-0936.72%$33,604
AG2-3848.78%$43,897
AG2-4275.30%$26,484
AG2-4289.57%$47,860
AG2-43618.87%$94,366
AG2-57013.87%$69,363
AG2-5711.76%$8,781
AG2-5815.15%$25,760
AH1-52810.87%$54,374
AH1-7174.49%$22,467

Cost Allocation details for (Pending) / TC2-PH1-DOM-0049


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42815.90%$7,841,590
AG2-43632.58%$16,067,991
AG2-5707.66%$3,775,788
AG2-5713.06%$1,510,456
AH1-04215.85%$7,817,012
AH1-52814.39%$7,097,246
AH1-71710.57%$5,213,916

Cost Allocation details for (Pending) / TC2-PH1-DOM-0050


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-09317.23%$9,024,587
AG2-64682.77%$43,339,413

Cost Allocation details for (Pending) / TC2-PH1-DOM-0051


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07712.28%$1,399
AG2-1712.37%$270
AG2-1883.88%$442
AG2-1983.52%$402
AG2-2133.16%$360
AG2-2708.53%$972
AG2-4403.87%$441
AG2-4414.83%$551
AG2-4425.41%$617
AG2-5413.45%$393
AG2-5660.67%$76
AG2-5819.08%$1,035
AG2-6592.05%$234
AH1-0563.74%$427
AH1-3433.98%$454
AH1-3778.75%$997
AH1-4392.23%$254
AH1-52818.21%$2,075

Cost Allocation details for (Pending) / TC2-PH1-DOM-0063


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44021.51%$1,313,720
AG2-44126.88%$1,642,154
AG2-44230.11%$1,839,205
AH1-05621.51%$1,313,720

Cost Allocation details for (Pending) / TC2-PH1-DOM-0071


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0885.91%$4,892,618
AG2-43614.15%$11,707,917
AH1-5286.29%$5,201,462
AH1-67622.76%$18,825,984
AH1-6810.56%$462,576
AH1-71212.52%$10,354,029
AH1-71623.22%$19,207,896
AH1-72314.59%$12,065,519

Cost Allocation details for (Pending) / TC2-PH1-DOM-0072


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0887.83%$47,005
AG2-43618.75%$112,489
AH1-5288.33%$49,971
AH1-67628.16%$168,963
AH1-6810.75%$4,480
AH1-71216.71%$100,259
AH1-72319.47%$116,833

Cost Allocation details for (Pending) / TC2-PH1-DOM-0073


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0887.83%$47,005
AG2-43618.75%$112,489
AH1-5288.33%$49,971
AH1-67628.16%$168,963
AH1-6810.75%$4,480
AH1-71216.71%$100,259
AH1-72319.47%$116,833

Cost Allocation details for (Pending) / TC2-PH1-DOM-0075


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0885.32%$5,883,523
AG2-4285.07%$5,604,107
AG2-43612.69%$14,035,461
AG2-5709.46%$10,463,443
AG2-5711.20%$1,324,471
AH1-2639.05%$10,010,303
AH1-5287.44%$8,233,540
AH1-67624.68%$27,304,435
AH1-6810.51%$561,378
AH1-71211.36%$12,563,732
AH1-72313.23%$14,640,609

Cost Allocation details for (Pending) / TC2-PH1-DOM-0076


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0886.32%$37,901
AG2-43615.09%$90,521
AH1-26310.80%$64,771
AH1-5286.71%$40,233
AH1-67631.06%$186,369
AH1-6810.61%$3,643
AH1-71213.59%$81,542
AH1-72315.84%$95,021

Cost Allocation details for (Pending) / TC2-PH1-DOM-0077


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0886.32%$37,901
AG2-43615.09%$90,521
AH1-26310.80%$64,771
AH1-5286.71%$40,233
AH1-67631.06%$186,369
AH1-6810.61%$3,643
AH1-71213.59%$81,542
AH1-72315.84%$95,021

Cost Allocation details for (Pending) / TC2-PH1-DOM-0078


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0886.32%$37,901
AG2-43615.09%$90,521
AH1-26310.80%$64,771
AH1-5286.71%$40,233
AH1-67631.06%$186,369
AH1-6810.61%$3,643
AH1-71213.59%$81,542
AH1-72315.84%$95,021

Cost Allocation details for (Pending) / TC2-PH1-DOM-0080


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.70%$2,803
AG2-0691.05%$4,205
AG2-0772.63%$10,534
AG2-0884.25%$16,982
AG2-1513.52%$14,079
AG2-1712.22%$8,865
AG2-1887.52%$30,090
AG2-1982.61%$10,449
AG2-2132.24%$8,977
AG2-2703.89%$15,569
AG2-3380.77%$3,074
AG2-3391.92%$7,685
AG2-3690.52%$2,080
AG2-4282.16%$8,649
AG2-4367.74%$30,957
AG2-4402.66%$10,630
AG2-4413.32%$13,286
AG2-4423.89%$15,559
AG2-5661.62%$6,472
AG2-5701.88%$7,518
AG2-5710.75%$3,007
AG2-5812.04%$8,140
AG2-5836.35%$25,382
AH1-0563.66%$14,640
AH1-2413.52%$14,079
AH1-3775.50%$21,991
AH1-4082.13%$8,502
AH1-4394.46%$17,832
AH1-5283.74%$14,977
AH1-5465.10%$20,404
AH1-6875.65%$22,584

Cost Allocation details for (Pending) / TC2-PH1-DOM-1000


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$27,690
AG2-42727.56%$44,103
AG2-42855.13%$88,207

Cost Allocation details for (Pending) / TC2-PH1-DOM-1001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$69,224
AG2-42727.56%$110,259
AG2-42855.13%$220,517

Cost Allocation details for (Pending) / TC2-PH1-DOM-1002


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.61%$21,267
AG2-42726.46%$33,874
AG2-42856.92%$72,859

Cost Allocation details for (Pending) / TC2-PH1-DOM-1003


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.61%$66,459
AG2-42726.46%$105,855
AG2-42856.92%$227,685

Cost Allocation details for (Pending) / TC2-PH1-DOM-1004


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.62%$37,233
AG2-42726.46%$59,281
AG2-42856.91%$127,486

Cost Allocation details for (Pending) / TC2-PH1-DOM-1005


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-010100.00%$320,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-1007


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0051.51%$50,027
AG2-2156.65%$219,850
AG2-3668.45%$279,473
AG2-46924.82%$820,480
AG2-64610.37%$342,916
AH1-04210.85%$358,654
AH1-1576.96%$230,057
AH1-71630.39%$1,004,544

Cost Allocation details for (Pending) / TC2-PH1-DOM-1008


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-32017.57%$87,867
AG2-43628.92%$144,608
AG2-46914.48%$72,403
AH1-52816.99%$84,971
AH1-6823.99%$19,942
AH1-6834.75%$23,738
AH1-6914.94%$24,687
AH1-6924.94%$24,687
AH1-6943.42%$17,095

Cost Allocation details for (Pending) / TC2-PH1-DOM-1009


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-32016.80%$168,029
AG2-43627.65%$276,535
AG2-46918.23%$182,305
AH1-52816.25%$162,491
AH1-6823.81%$38,136
AH1-6834.54%$45,395
AH1-6914.72%$47,209
AH1-6924.72%$47,209
AH1-6943.27%$32,692

Cost Allocation details for (Pending) / TC2-PH1-DOM-1010


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-32017.57%$351,469
AG2-43628.92%$578,434
AG2-46914.48%$289,611
AH1-52816.99%$339,885
AH1-6823.99%$79,769
AH1-6834.75%$94,953
AH1-6914.94%$98,749
AH1-6924.94%$98,749
AH1-6943.42%$68,382

Cost Allocation details for (Pending) / TC2-PH1-DOM-1011


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-32017.57%$87,867
AG2-43628.92%$144,608
AG2-46914.48%$72,403
AH1-52816.99%$84,971
AH1-6823.99%$19,942
AH1-6834.75%$23,738
AH1-6914.94%$24,687
AH1-6924.94%$24,687
AH1-6943.42%$17,095

Cost Allocation details for (Pending) / TC2-PH1-DOM-1013


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42821.01%$24,370,315
AG2-46923.27%$26,998,306
AH1-04221.09%$24,468,558
AH1-6826.27%$7,269,956
AH1-6837.46%$8,657,633
AH1-6917.76%$9,001,482
AH1-6927.76%$9,001,482
AH1-6945.37%$6,232,268

Cost Allocation details for (Pending) / TC2-PH1-DOM-1014


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44021.51%$577,719
AG2-44126.88%$722,151
AG2-44230.11%$808,810
AH1-05621.51%$577,719

Cost Allocation details for (Pending) / TC2-PH1-DOM-1015


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44021.51%$2,151
AG2-44126.88%$2,688
AG2-44230.11%$3,011
AH1-05621.51%$2,151

Cost Allocation details for (Pending) / TC2-PH1-DOM-1016


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44021.51%$86,021
AG2-44126.88%$107,527
AG2-44230.11%$120,430
AH1-05621.51%$86,021

Cost Allocation details for (Pending) / TC2-PH1-DOM-1017


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44021.51%$129,032
AG2-44126.88%$161,290
AG2-44230.11%$180,645
AH1-05621.51%$129,032

Cost Allocation details for (Pending) / TC2-PH1-DOM-1019


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1882.56%$68,773
AG2-44019.01%$510,650
AG2-44123.76%$638,315
AG2-44226.61%$714,913
AH1-05619.01%$510,650
AH1-2157.58%$203,571
AH1-4391.47%$39,528

Cost Allocation details for (Pending) / TC2-PH1-DOM-1021


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$6,516,425
AG2-44124.76%$8,145,551
AG2-44227.73%$9,123,027
AH1-05619.81%$6,516,425
AH1-2157.90%$2,597,772

Cost Allocation details for (Pending) / TC2-PH1-DOM-1023


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1882.50%$7,505
AG2-1980.63%$1,881
AG2-44018.57%$55,724
AG2-44123.22%$69,655
AG2-44226.00%$78,014
AG2-5660.39%$1,178
AH1-05618.57%$55,724
AH1-2157.40%$22,214
AH1-4391.44%$4,313
AH1-5461.26%$3,790

Cost Allocation details for (Pending) / TC2-PH1-DOM-1024


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1882.50%$517,371
AG2-1980.63%$129,708
AG2-44018.57%$3,841,554
AG2-44123.22%$4,801,955
AG2-44226.00%$5,378,195
AG2-5660.39%$81,201
AH1-05618.57%$3,841,554
AH1-2157.40%$1,531,435
AH1-4391.44%$297,364
AH1-5461.26%$261,264

Cost Allocation details for (Pending) / TC2-PH1-DOM-1025


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$990
AG2-44124.76%$1,238
AG2-44227.73%$1,387
AH1-05619.81%$990
AH1-2157.90%$395

Cost Allocation details for (Pending) / TC2-PH1-DOM-1026


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$59,422
AG2-44124.76%$74,277
AG2-44227.73%$83,191
AH1-05619.81%$59,422
AH1-2157.90%$23,688

Cost Allocation details for (Pending) / TC2-PH1-DOM-1027


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$59,422
AG2-44124.76%$74,277
AG2-44227.73%$83,191
AH1-05619.81%$59,422
AH1-2157.90%$23,688

Cost Allocation details for (Pending) / TC2-PH1-DOM-1031


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07715.44%$7,591,871
AG2-19810.80%$5,309,855
AG2-27012.49%$6,140,173
AG2-5662.70%$1,327,464
AG2-58111.85%$5,826,660
AH1-37723.03%$11,322,866
AH1-52823.70%$11,653,111

Cost Allocation details for (Pending) / TC2-PH1-DOM-1032


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0774.22%$116,992
AG2-1511.62%$44,900
AG2-1711.79%$49,715
AG2-18810.34%$286,703
AG2-1986.40%$177,623
AG2-2132.39%$66,284
AG2-2703.41%$94,621
AG2-4403.66%$101,480
AG2-4414.57%$126,851
AG2-4425.12%$142,074
AG2-5663.04%$84,275
AG2-5813.24%$89,790
AG2-5831.66%$46,105
AH1-0564.73%$131,257
AH1-2150.92%$25,594
AH1-2170.87%$24,240
AH1-2411.54%$42,628
AH1-2800.86%$23,805
AH1-37715.25%$422,936
AH1-4396.27%$174,068
AH1-5286.47%$179,576
AH1-5465.89%$163,420
AH1-6764.56%$126,371
AH1-6871.18%$32,691

Cost Allocation details for (Pending) / TC2-PH1-DOM-1036


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.92%$3,017,571
AG2-0692.88%$4,526,357
AG2-0777.15%$11,239,940
AG2-3382.16%$3,388,274
AG2-3395.39%$8,470,817
AG2-3692.26%$3,558,016
AG2-43621.06%$33,090,702
AG2-4401.72%$2,697,502
AG2-4412.15%$3,372,271
AG2-4422.45%$3,855,785
AG2-5704.90%$7,697,403
AG2-5711.96%$3,078,961
AG2-5815.74%$9,015,459
AH1-5289.23%$14,501,499
AH1-71629.03%$45,611,444

Cost Allocation details for (Pending) / TC2-PH1-DOM-1037


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0683.58%$98,425
AG2-0695.37%$147,638
AG2-3382.71%$74,455
AG2-3396.77%$186,137
AG2-3694.12%$113,248
AG2-43626.38%$725,541
AG2-4401.44%$39,470
AG2-4411.79%$49,340
AG2-4423.70%$101,818
AG2-57019.26%$529,615
AG2-5712.44%$67,040
AG2-5817.22%$198,584
AH1-52815.23%$418,689

Cost Allocation details for (Pending) / TC2-PH1-DOM-1042


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00524.05%$4,208,995
AG2-36675.95%$13,291,005

Cost Allocation details for (Pending) / TC2-PH1-DOM-2001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1115.76%$490,200
AG2-1126.04%$513,936
AG2-15214.92%$1,270,297
AG2-3116.96%$592,053
AG2-54130.89%$2,629,314
AH1-34335.43%$3,016,201

Cost Allocation details for (Pending) / TC2-PH1-DOM-2002


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-15239.60%$158,414
AG2-31160.40%$241,586

Cost Allocation details for (Pending) / TC2-PH1-DOM-2004


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-20814.72%$73,615
AG2-4285.62%$28,088
AG2-43611.09%$55,474
AG2-5708.39%$41,962
AG2-5711.06%$5,311
AH1-0424.76%$23,797
AH1-3235.99%$29,949
AH1-5286.53%$32,660
AH1-6796.62%$33,108
AH1-6810.71%$3,559
AH1-71215.93%$79,655
AH1-72318.56%$92,821

Cost Allocation details for (Pending) / TC2-PH1-DOM-2005


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-20814.72%$3,211,365
AG2-4285.62%$1,225,332
AG2-43611.09%$2,420,004
AG2-5708.39%$1,830,551
AG2-5711.06%$231,698
AH1-0424.76%$1,038,099
AH1-3235.99%$1,306,488
AH1-5286.53%$1,424,771
AH1-6796.62%$1,444,315
AH1-6810.71%$155,264
AH1-71215.93%$3,474,886
AH1-72318.56%$4,049,226

Cost Allocation details for (Pending) / TC2-PH1-DOM-2007


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1714.76%$19,033
AG2-2136.34%$25,376
AG2-4407.14%$28,568
AG2-4418.93%$35,710
AG2-44210.00%$39,995
AH1-0565.87%$23,480
AH1-40856.96%$227,838

Cost Allocation details for (Pending) / TC2-PH1-DOM-2008


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07712.28%$219,287
AG2-1712.37%$42,258
AG2-1883.88%$69,220
AG2-1983.52%$62,923
AG2-2133.15%$56,344
AG2-2708.53%$152,347
AG2-4403.87%$69,049
AG2-4414.83%$86,314
AG2-4425.41%$96,671
AG2-5413.45%$61,605
AG2-5660.67%$11,946
AG2-5819.08%$162,164
AG2-6592.05%$36,664
AH1-0563.74%$66,866
AH1-3433.98%$71,074
AH1-3778.75%$156,225
AH1-4392.23%$39,842
AH1-52818.21%$325,201

Cost Allocation details for (Pending) / TC2-PH1-DOM-2009


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$300,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2010


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$400,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2011


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$1,799,820
AG2-42727.56%$2,866,727
AG2-42855.13%$5,733,453

Cost Allocation details for (Pending) / TC2-PH1-DOM-2012


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$4,254,221
AG2-42727.56%$6,776,060
AG2-42855.13%$13,552,119

Cost Allocation details for (Pending) / TC2-PH1-DOM-2013


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$31,843
AG2-42727.56%$50,719
AG2-42855.13%$101,438

Cost Allocation details for (Pending) / TC2-PH1-DOM-2014


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$69,224
AG2-42727.56%$110,259
AG2-42855.13%$220,517

Cost Allocation details for (Pending) / TC2-PH1-DOM-2015


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$51,918
AG2-42727.56%$82,694
AG2-42855.13%$165,388

Cost Allocation details for (Pending) / TC2-PH1-DOM-2016


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$129,795
AG2-42727.56%$206,735
AG2-42855.13%$413,470

Cost Allocation details for (Pending) / TC2-PH1-DOM-2017


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$51,935
AG2-42727.56%$82,688
AG2-42855.13%$165,377

Cost Allocation details for (Pending) / TC2-PH1-DOM-2018


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.62%$37,233
AG2-42726.46%$59,281
AG2-42856.91%$127,486

Cost Allocation details for (Pending) / TC2-PH1-DOM-2019


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.62%$2,047,834
AG2-42726.46%$3,260,449
AG2-42856.91%$7,011,717

Cost Allocation details for (Pending) / TC2-PH1-DOM-2020


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.61%$1,302,580
AG2-42726.46%$2,074,730
AG2-42856.92%$4,462,689

Cost Allocation details for (Pending) / TC2-PH1-DOM-2021


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.61%$47,850
AG2-42726.46%$76,215
AG2-42856.92%$163,936

Cost Allocation details for (Pending) / TC2-PH1-DOM-2022


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.61%$16,781
AG2-42726.46%$26,728
AG2-42856.92%$57,491

Cost Allocation details for (Pending) / TC2-PH1-DOM-2023


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$3,289,517
AG2-42727.56%$5,239,494
AG2-42855.13%$10,478,989

Cost Allocation details for (Pending) / TC2-PH1-DOM-2024


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42621.56%$3,036,234
AG2-4274.56%$641,513
AG2-42873.88%$10,402,253

Cost Allocation details for (Pending) / TC2-PH1-DOM-2025


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42622.59%$50,610
AG2-42877.41%$173,390

Cost Allocation details for (Pending) / TC2-PH1-DOM-2026


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42622.59%$1,130
AG2-42877.41%$3,870

Cost Allocation details for (Pending) / TC2-PH1-DOM-2027


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1711.59%$9,513
AG2-2132.11%$12,684
AG2-44018.11%$108,681
AG2-44122.64%$135,850
AG2-44225.36%$152,152
AH1-05620.68%$124,076
AH1-2159.51%$57,045

Cost Allocation details for (Pending) / TC2-PH1-DOM-2028


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1711.28%$209,671
AG2-2131.70%$279,575
AG2-44019.22%$3,154,017
AG2-44124.02%$3,942,531
AG2-44226.90%$4,415,640
AH1-05619.22%$3,154,017
AH1-2157.66%$1,257,349

Cost Allocation details for (Pending) / TC2-PH1-DOM-2029


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$79,229
AG2-44124.76%$99,036
AG2-44227.73%$110,921
AH1-05619.81%$79,229
AH1-2157.90%$31,585

Cost Allocation details for (Pending) / TC2-PH1-DOM-2030


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44018.81%$56,428
AG2-44123.51%$70,534
AG2-44226.33%$78,998
AH1-05621.47%$64,421
AH1-2159.87%$29,618

Cost Allocation details for (Pending) / TC2-PH1-DOM-2031


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44018.81%$56,428
AG2-44123.51%$70,534
AG2-44226.33%$78,998
AH1-05621.47%$64,421
AH1-2159.87%$29,618

Cost Allocation details for (Pending) / TC2-PH1-DOM-2032


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44018.81%$141,069
AG2-44123.51%$176,336
AG2-44226.33%$197,496
AH1-05621.47%$161,053
AH1-2159.87%$74,046

Cost Allocation details for (Pending) / TC2-PH1-DOM-2033


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$79,229
AG2-44124.76%$99,036
AG2-44227.73%$110,921
AH1-05619.81%$79,229
AH1-2157.90%$31,585

Cost Allocation details for (Pending) / TC2-PH1-DOM-2034


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$148,554
AG2-44124.76%$185,693
AG2-44227.73%$207,977
AH1-05619.81%$148,554
AH1-2157.90%$59,221

Cost Allocation details for (Pending) / TC2-PH1-DOM-2035


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$297,109
AG2-44124.76%$371,387
AG2-44227.73%$415,954
AH1-05619.81%$297,109
AH1-2157.90%$118,442

Cost Allocation details for (Pending) / TC2-PH1-DOM-2036


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$9,665,091
AG2-44124.76%$12,081,395
AG2-44227.73%$13,531,153
AH1-05619.81%$9,665,091
AH1-2157.90%$3,854,069

Cost Allocation details for (Pending) / TC2-PH1-DOM-2037


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$72,889
AG2-44124.76%$91,112
AG2-44227.73%$102,045
AH1-05619.81%$72,889
AH1-2157.90%$29,065

Cost Allocation details for (Pending) / TC2-PH1-DOM-2038


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$59,420
AG2-44124.76%$74,276
AG2-44227.73%$83,189
AH1-05619.81%$59,420
AH1-2157.90%$23,695

Cost Allocation details for (Pending) / TC2-PH1-DOM-2039


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$79,227
AG2-44124.76%$99,034
AG2-44227.73%$110,918
AH1-05619.81%$79,227
AH1-2157.90%$31,593

Cost Allocation details for (Pending) / TC2-PH1-DOM-2040


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44019.81%$59,420
AG2-44124.76%$74,276
AG2-44227.73%$83,189
AH1-05619.81%$59,420
AH1-2157.90%$23,695

Cost Allocation details for (Pending) / TC2-PH1-DOM-2042


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00524.03%$96,129
AG2-36675.97%$303,871

Cost Allocation details for (Pending) / TC2-PH1-DOM-2043


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.12%$39,652
AG2-0691.68%$59,477
AG2-0778.29%$292,796
AG2-1110.43%$15,101
AG2-1120.45%$15,830
AG2-1510.88%$31,260
AG2-1521.79%$63,434
AG2-1711.60%$56,405
AG2-1882.61%$92,359
AG2-1982.38%$83,993
AG2-2132.13%$75,209
AG2-2705.76%$203,423
AG2-2720.65%$23,062
AG2-3410.79%$27,834
AG2-3690.96%$34,099
AG2-4402.61%$92,165
AG2-4413.26%$115,205
AG2-4423.65%$129,034
AG2-5221.22%$43,134
AG2-5412.33%$82,250
AG2-5661.13%$39,936
AG2-5704.36%$154,059
AG2-5711.90%$67,037
AG2-5816.13%$216,526
AG2-5830.92%$32,494
AG2-6591.38%$48,915
AH1-0562.53%$89,249
AH1-2151.06%$37,455
AH1-2410.84%$29,676
AH1-3141.91%$67,343
AH1-3432.69%$94,896
AH1-3775.90%$208,557
AH1-4081.29%$45,498
AH1-4391.50%$53,152
AH1-52812.29%$434,213
AH1-5350.73%$25,767
AH1-5460.89%$31,579
AH1-6870.64%$22,479
AH1-6903.50%$123,688
AH1-7213.84%$135,756

Cost Allocation details for (Pending) / TC2-PH1-DOM-2044


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00524.03%$26,530
AG2-36675.97%$83,870

Cost Allocation details for (Pending) / TC2-PH1-DOM-2045


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00515.39%$753,242
AG2-21535.96%$1,760,093
AG2-36648.65%$2,381,066

Cost Allocation details for (Pending) / TC2-PH1-DOM-2047


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00524.03%$35,375
AG2-36675.97%$111,825

Cost Allocation details for (Pending) / TC2-PH1-DOM-2048


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00515.39%$1,682,034
AG2-21535.96%$3,930,500
AG2-36648.65%$5,317,065

Cost Allocation details for (Pending) / TC2-PH1-DOM-2049


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00513.73%$2,960,851
AG2-21532.08%$6,918,781
AG2-36643.39%$9,359,524
AG2-46910.81%$2,330,644

Cost Allocation details for (Pending) / TC2-PH1-DOM-2052


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$2,812,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2053


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$10,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2054


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$500,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2055


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$400,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2056


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$400,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2057


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$950,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2058


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$10,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2059


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$28,766,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2060


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-0121.72%$511,643
AH1-67698.28%$29,242,357

Cost Allocation details for (Pending) / TC2-PH1-DOM-2061


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-0121.72%$53,582
AH1-67698.28%$3,062,418

Cost Allocation details for (Pending) / TC2-PH1-DOM-2062


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-0121.72%$8,598
AH1-67698.28%$491,402

Cost Allocation details for (Pending) / TC2-PH1-DOM-2063


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.70%$2,929
AG2-0691.05%$4,394
AG2-0772.63%$11,008
AG2-0884.25%$17,747
AG2-1513.52%$14,712
AG2-1712.22%$9,264
AG2-1887.52%$31,444
AG2-1982.61%$10,919
AG2-2132.24%$9,381
AG2-2703.89%$16,270
AG2-3380.77%$3,212
AG2-3391.92%$8,031
AG2-3690.52%$2,174
AG2-4282.16%$9,038
AG2-4367.74%$32,350
AG2-4402.66%$11,108
AG2-4413.32%$13,884
AG2-4423.89%$16,259
AG2-5661.62%$6,763
AG2-5701.88%$7,857
AG2-5710.75%$3,142
AG2-5812.04%$8,507
AG2-5836.35%$26,524
AH1-0563.66%$15,298
AH1-2413.52%$14,712
AH1-3775.50%$22,981
AH1-4082.13%$8,885
AH1-4394.46%$18,634
AH1-5283.74%$15,651
AH1-5465.10%$21,322
AH1-6875.65%$23,600

Cost Allocation details for (Pending) / TC2-PH1-DOM-2064


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.59%$2,954
AG2-0690.89%$4,432
AG2-0772.22%$11,102
AG2-0883.58%$17,891
AG2-1512.97%$14,838
AG2-1711.87%$9,343
AG2-1887.87%$39,350
AG2-1982.90%$14,479
AG2-2132.49%$12,458
AG2-2703.28%$16,409
AG2-3380.65%$3,240
AG2-3391.62%$8,100
AG2-3690.44%$2,192
AG2-4282.12%$10,624
AG2-4366.52%$32,614
AG2-4402.43%$12,126
AG2-4413.03%$15,157
AG2-4424.31%$21,562
AG2-5661.36%$6,821
AG2-5705.00%$25,024
AG2-5710.63%$3,168
AG2-5812.26%$11,289
AG2-5837.03%$35,169
AH1-0563.55%$17,769
AH1-2412.97%$14,838
AH1-3776.10%$30,476
AH1-4081.79%$8,960
AH1-4394.94%$24,707
AH1-5284.17%$20,828
AH1-5465.66%$28,317
AH1-6874.75%$23,765

Cost Allocation details for (Pending) / TC2-PH1-DOM-2065


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.70%$5,606
AG2-0691.05%$8,410
AG2-0772.63%$21,068
AG2-0884.25%$33,965
AG2-1513.52%$28,157
AG2-1712.22%$17,731
AG2-1887.52%$60,179
AG2-1982.61%$20,897
AG2-2132.24%$17,955
AG2-2703.89%$31,138
AG2-3380.77%$6,148
AG2-3391.92%$15,371
AG2-3690.52%$4,160
AG2-4282.16%$17,297
AG2-4367.74%$61,914
AG2-4402.66%$21,260
AG2-4413.32%$26,573
AG2-4423.89%$31,118
AG2-5661.62%$12,943
AG2-5701.88%$15,037
AG2-5710.75%$6,013
AG2-5812.04%$16,281
AG2-5836.35%$50,763
AH1-0563.66%$29,279
AH1-2413.52%$28,157
AH1-3775.50%$43,982
AH1-4082.13%$17,004
AH1-4394.46%$35,663
AH1-5283.74%$29,953
AH1-5465.10%$40,807
AH1-6875.65%$45,167

Cost Allocation details for (Pending) / TC2-PH1-DOM-2066


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.59%$2,954
AG2-0690.89%$4,432
AG2-0772.22%$11,102
AG2-0883.58%$17,891
AG2-1512.97%$14,838
AG2-1711.87%$9,343
AG2-1887.87%$39,350
AG2-1982.90%$14,479
AG2-2132.49%$12,458
AG2-2703.28%$16,409
AG2-3380.65%$3,240
AG2-3391.62%$8,100
AG2-3690.44%$2,192
AG2-4282.12%$10,624
AG2-4366.52%$32,614
AG2-4402.43%$12,126
AG2-4413.03%$15,157
AG2-4424.31%$21,562
AG2-5661.36%$6,821
AG2-5705.00%$25,024
AG2-5710.63%$3,168
AG2-5812.26%$11,289
AG2-5837.03%$35,169
AH1-0563.55%$17,769
AH1-2412.97%$14,838
AH1-3776.10%$30,476
AH1-4081.79%$8,960
AH1-4394.94%$24,707
AH1-5284.17%$20,828
AH1-5465.66%$28,317
AH1-6874.75%$23,765

Cost Allocation details for (Pending) / TC2-PH1-DOM-2067


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.59%$2,954
AG2-0690.89%$4,432
AG2-0772.22%$11,102
AG2-0883.58%$17,891
AG2-1512.97%$14,838
AG2-1711.87%$9,343
AG2-1887.87%$39,350
AG2-1982.90%$14,479
AG2-2132.49%$12,458
AG2-2703.28%$16,409
AG2-3380.65%$3,240
AG2-3391.62%$8,100
AG2-3690.44%$2,192
AG2-4282.12%$10,624
AG2-4366.52%$32,614
AG2-4402.43%$12,126
AG2-4413.03%$15,157
AG2-4424.31%$21,562
AG2-5661.36%$6,821
AG2-5705.00%$25,024
AG2-5710.63%$3,168
AG2-5812.26%$11,289
AG2-5837.03%$35,169
AH1-0563.55%$17,769
AH1-2412.97%$14,838
AH1-3776.10%$30,476
AH1-4081.79%$8,960
AH1-4394.94%$24,707
AH1-5284.17%$20,828
AH1-5465.66%$28,317
AH1-6874.75%$23,765

Cost Allocation details for (Pending) / TC2-PH1-DOM-2068


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.07%$4,893
AG2-0691.61%$7,340
AG2-0773.05%$13,902
AG2-0884.01%$18,287
AG2-1515.63%$25,667
AG2-1887.17%$32,695
AG2-1982.49%$11,369
AG2-2131.93%$8,780
AG2-2703.74%$17,034
AG2-3380.73%$3,331
AG2-3391.83%$8,327
AG2-3690.22%$1,007
AG2-4282.04%$9,284
AG2-4367.37%$33,587
AG2-4402.66%$12,129
AG2-4413.32%$15,162
AG2-4423.72%$16,980
AG2-5661.54%$7,040
AG2-5701.80%$8,187
AG2-5710.72%$3,274
AG2-5811.94%$8,856
AG2-5836.04%$27,544
AH1-0563.50%$15,954
AH1-2172.95%$13,450
AH1-2415.63%$25,667
AH1-3775.25%$23,937
AH1-4394.25%$19,373
AH1-5283.57%$16,266
AH1-5464.86%$22,156
AH1-6875.38%$24,522

Cost Allocation details for (Pending) / TC2-PH1-DOM-2069


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.13%$5,636
AG2-0691.69%$8,454
AG2-0773.20%$16,005
AG2-0883.20%$15,999
AG2-1515.91%$29,526
AG2-1887.10%$35,506
AG2-1982.62%$13,084
AG2-2132.02%$10,104
AG2-2702.98%$14,911
AG2-3380.58%$2,916
AG2-3391.46%$7,289
AG2-3690.41%$2,042
AG2-4281.89%$9,472
AG2-4365.88%$29,388
AG2-4402.79%$13,958
AG2-4413.49%$17,448
AG2-4423.91%$19,541
AG2-5661.23%$6,162
AG2-5704.53%$22,634
AG2-5710.57%$2,865
AG2-5812.04%$10,199
AG2-5836.34%$31,692
AH1-0563.22%$16,081
AH1-2173.09%$15,470
AH1-2415.61%$28,031
AH1-3775.51%$27,548
AH1-4394.46%$22,291
AH1-5283.76%$18,786
AH1-5465.11%$25,534
AH1-6874.29%$21,427

Cost Allocation details for (Pending) / TC2-PH1-DOM-2070


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.07%$4,292
AG2-0691.61%$6,439
AG2-0773.05%$12,195
AG2-0884.01%$16,041
AG2-1515.63%$22,515
AG2-1887.17%$28,680
AG2-1982.49%$9,973
AG2-2131.93%$7,702
AG2-2703.74%$14,942
AG2-3380.73%$2,922
AG2-3391.83%$7,304
AG2-3690.22%$884
AG2-4282.04%$8,144
AG2-4367.37%$29,462
AG2-4402.66%$10,640
AG2-4413.32%$13,300
AG2-4423.72%$14,895
AG2-5661.54%$6,175
AG2-5701.80%$7,182
AG2-5710.72%$2,872
AG2-5811.94%$7,769
AG2-5836.04%$24,161
AH1-0563.50%$13,995
AH1-2172.95%$11,798
AH1-2415.63%$22,515
AH1-3775.25%$20,997
AH1-4394.25%$16,994
AH1-5283.57%$14,269
AH1-5464.86%$19,435
AH1-6875.38%$21,511

Cost Allocation details for (Pending) / TC2-PH1-DOM-2071


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.11%$5,542
AG2-0691.66%$8,314
AG2-0773.15%$15,739
AG2-0883.15%$15,733
AG2-1515.81%$29,035
AG2-1711.66%$8,316
AG2-1886.98%$34,915
AG2-1982.57%$12,866
AG2-2131.99%$9,936
AG2-2702.93%$14,663
AG2-3380.57%$2,868
AG2-3391.43%$7,168
AG2-3690.40%$2,008
AG2-4281.86%$9,314
AG2-4365.78%$28,899
AG2-4402.75%$13,726
AG2-4413.43%$17,157
AG2-4423.84%$19,216
AG2-5661.21%$6,060
AG2-5704.45%$22,257
AG2-5710.56%$2,818
AG2-5812.01%$10,029
AG2-5836.23%$31,165
AH1-0563.16%$15,813
AH1-2173.04%$15,213
AH1-2415.51%$27,565
AH1-3775.42%$27,090
AH1-4394.38%$21,920
AH1-5283.69%$18,474
AH1-5465.02%$25,110
AH1-6874.21%$21,071

Cost Allocation details for (Pending) / TC2-PH1-DOM-2072


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.05%$5,253
AG2-0691.58%$7,881
AG2-0772.99%$14,927
AG2-0883.93%$19,635
AG2-1515.51%$27,560
AG2-1712.07%$10,373
AG2-1887.02%$35,106
AG2-1982.44%$12,207
AG2-2131.89%$9,428
AG2-2703.66%$18,290
AG2-3380.72%$3,577
AG2-3391.79%$8,941
AG2-3690.22%$1,081
AG2-4281.99%$9,969
AG2-4367.21%$36,064
AG2-4402.60%$13,024
AG2-4413.26%$16,280
AG2-4423.65%$18,233
AG2-5661.51%$7,559
AG2-5701.76%$8,791
AG2-5710.70%$3,516
AG2-5811.90%$9,509
AG2-5835.91%$29,575
AH1-0563.43%$17,131
AH1-2172.89%$14,442
AH1-2415.51%$27,560
AH1-3775.14%$25,702
AH1-4394.16%$20,802
AH1-5283.49%$17,466
AH1-5464.76%$23,790
AH1-6875.27%$26,330

Cost Allocation details for (Pending) / TC2-PH1-DOM-2073


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.11%$5,542
AG2-0691.66%$8,314
AG2-0773.15%$15,739
AG2-0883.15%$15,733
AG2-1515.81%$29,035
AG2-1711.66%$8,316
AG2-1886.98%$34,915
AG2-1982.57%$12,866
AG2-2131.99%$9,936
AG2-2702.93%$14,663
AG2-3380.57%$2,868
AG2-3391.43%$7,168
AG2-3690.40%$2,008
AG2-4281.86%$9,314
AG2-4365.78%$28,899
AG2-4402.75%$13,726
AG2-4413.43%$17,157
AG2-4423.84%$19,216
AG2-5661.21%$6,060
AG2-5704.45%$22,257
AG2-5710.56%$2,818
AG2-5812.01%$10,029
AG2-5836.23%$31,165
AH1-0563.16%$15,813
AH1-2173.04%$15,213
AH1-2415.51%$27,565
AH1-3775.42%$27,090
AH1-4394.38%$21,920
AH1-5283.69%$18,474
AH1-5465.02%$25,110
AH1-6874.21%$21,071

Cost Allocation details for (Pending) / TC2-PH1-DOM-2074


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00515.39%$8,156,529
AG2-21535.96%$19,059,373
AG2-36648.65%$25,784,098

Cost Allocation details for (Pending) / TC2-PH1-DOM-2076


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.56%$2,260
AG2-0690.85%$3,390
AG2-0776.22%$24,866
AG2-1712.07%$8,292
AG2-1889.33%$37,308
AG2-1983.81%$15,255
AG2-2132.76%$11,057
AG2-2703.89%$15,561
AG2-3380.36%$1,430
AG2-3390.89%$3,576
AG2-3411.01%$4,052
AG2-3690.49%$1,944
AG2-4363.72%$14,862
AG2-4403.81%$15,244
AG2-4414.76%$19,055
AG2-4425.34%$21,341
AG2-5221.27%$5,097
AG2-5411.04%$4,167
AG2-5661.36%$5,425
AG2-5700.94%$3,778
AG2-5710.38%$1,511
AG2-5814.75%$18,985
AG2-6591.40%$5,596
AH1-0564.38%$17,519
AH1-2151.08%$4,315
AH1-3140.77%$3,092
AH1-3431.19%$4,774
AH1-3778.28%$33,117
AH1-4081.48%$5,905
AH1-4395.82%$23,289
AH1-5289.52%$38,070
AH1-5466.47%$25,868

Cost Allocation details for (Pending) / TC2-PH1-DOM-2077


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.56%$4,520
AG2-0690.85%$6,780
AG2-0776.22%$49,733
AG2-1712.07%$16,585
AG2-1889.33%$74,615
AG2-1983.81%$30,510
AG2-2132.76%$22,113
AG2-2703.89%$31,121
AG2-3380.36%$2,861
AG2-3390.89%$7,152
AG2-3411.01%$8,105
AG2-3690.49%$3,887
AG2-4363.72%$29,724
AG2-4403.81%$30,488
AG2-4414.76%$38,110
AG2-4425.34%$42,683
AG2-5221.27%$10,193
AG2-5411.04%$8,333
AG2-5661.36%$10,850
AG2-5700.94%$7,555
AG2-5710.38%$3,023
AG2-5814.75%$37,970
AG2-6591.40%$11,193
AH1-0564.38%$35,038
AH1-2151.08%$8,629
AH1-3140.77%$6,185
AH1-3431.19%$9,548
AH1-3778.28%$66,233
AH1-4081.48%$11,809
AH1-4395.82%$46,578
AH1-5289.52%$76,140
AH1-5466.47%$51,736

Cost Allocation details for (Pending) / TC2-PH1-DOM-2078


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.56%$2,825
AG2-0690.85%$4,237
AG2-0776.22%$31,083
AG2-1712.07%$10,365
AG2-1889.33%$46,635
AG2-1983.81%$19,069
AG2-2132.76%$13,821
AG2-2703.89%$19,451
AG2-3380.36%$1,788
AG2-3390.89%$4,470
AG2-3411.01%$5,065
AG2-3690.49%$2,429
AG2-4363.72%$18,577
AG2-4403.81%$19,055
AG2-4414.76%$23,819
AG2-4425.34%$26,677
AG2-5221.27%$6,371
AG2-5411.04%$5,208
AG2-5661.36%$6,781
AG2-5700.94%$4,722
AG2-5710.38%$1,889
AG2-5814.75%$23,731
AG2-6591.40%$6,996
AH1-0564.38%$21,899
AH1-2151.08%$5,393
AH1-3140.77%$3,865
AH1-3431.19%$5,967
AH1-3778.28%$41,396
AH1-4081.48%$7,381
AH1-4395.82%$29,111
AH1-5289.52%$47,587
AH1-5466.47%$32,335

Cost Allocation details for (Pending) / TC2-PH1-DOM-2079


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0776.77%$33,855
AG2-1712.26%$11,290
AG2-18810.16%$50,793
AG2-1984.15%$20,769
AG2-2133.01%$15,053
AG2-2704.24%$21,185
AG2-3411.10%$5,517
AG2-4404.15%$20,754
AG2-4415.19%$25,943
AG2-4425.81%$29,056
AG2-5221.39%$6,939
AG2-5411.13%$5,673
AG2-5661.48%$7,386
AG2-5815.17%$25,847
AG2-6591.52%$7,619
AH1-0564.77%$23,852
AH1-2151.17%$5,874
AH1-3140.84%$4,210
AH1-3431.30%$6,500
AH1-3779.02%$45,087
AH1-4081.61%$8,039
AH1-4396.34%$31,708
AH1-52810.37%$51,831
AH1-5467.04%$35,219

Cost Allocation details for (Pending) / TC2-PH1-DOM-2085


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.89%$3,558
AG2-0691.33%$5,337
AG2-0777.41%$29,621
AG2-1712.47%$9,886
AG2-1984.55%$18,192
AG2-2133.30%$13,181
AG2-2706.10%$24,400
AG2-3380.56%$2,252
AG2-3391.41%$5,631
AG2-3411.59%$6,369
AG2-3690.76%$3,060
AG2-4365.85%$23,401
AG2-4404.54%$18,175
AG2-4415.68%$22,719
AG2-4426.36%$25,446
AG2-5221.52%$6,073
AG2-5411.24%$4,955
AG2-5662.13%$8,523
AG2-5701.49%$5,948
AG2-5710.59%$2,379
AG2-5815.65%$22,616
AG2-6591.67%$6,667
AH1-0565.96%$23,852
AH1-2151.29%$5,144
AH1-3141.22%$4,871
AH1-3431.42%$5,678
AH1-3779.87%$39,485
AH1-4081.84%$7,347
AH1-52811.31%$45,231

Cost Allocation details for (Pending) / TC2-PH1-DOM-2086


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0778.95%$44,774
AG2-1712.99%$14,930
AG2-1985.49%$27,463
AG2-2133.98%$19,907
AG2-2705.60%$28,019
AG2-3411.46%$7,298
AG2-4405.49%$27,445
AG2-4416.86%$34,306
AG2-4427.68%$38,422
AG2-5221.84%$9,183
AG2-5411.50%$7,507
AG2-5661.95%$9,766
AG2-5816.84%$34,184
AG2-6592.02%$10,082
AH1-0566.31%$31,539
AH1-2151.55%$7,769
AH1-3431.72%$8,600
AH1-37711.92%$59,618
AH1-4082.13%$10,641
AH1-52813.71%$68,548

Cost Allocation details for (Pending) / TC2-PH1-DOM-2087


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0778.95%$44,774
AG2-1712.99%$14,930
AG2-1985.49%$27,463
AG2-2133.98%$19,907
AG2-2705.60%$28,019
AG2-3411.46%$7,298
AG2-4405.49%$27,445
AG2-4416.86%$34,306
AG2-4427.68%$38,422
AG2-5221.84%$9,183
AG2-5411.50%$7,507
AG2-5661.95%$9,766
AG2-5816.84%$34,184
AG2-6592.02%$10,082
AH1-0566.31%$31,539
AH1-2151.55%$7,769
AH1-3431.72%$8,600
AH1-37711.92%$59,618
AH1-4082.13%$10,641
AH1-52813.71%$68,548

Cost Allocation details for (Pending) / TC2-PH1-DOM-2090


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-3821.49%$595,372
AG2-4272.85%$1,140,094
AG2-4288.63%$3,450,641
AG2-43616.39%$6,557,254
AG2-5708.86%$3,545,687
AG2-5711.53%$613,832
AG2-5812.80%$1,120,642
AG2-6468.93%$3,573,758
AH1-0405.42%$2,167,139
AH1-0427.94%$3,175,648
AH1-2164.51%$1,805,263
AH1-2710.85%$340,213
AH1-32311.19%$4,475,550
AH1-3242.42%$969,377
AH1-4082.29%$917,659
AH1-5288.65%$3,461,778
AH1-7175.23%$2,090,095

Cost Allocation details for (Pending) / TC2-PH1-DOM-2091


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07715.91%$6,362,347
AG2-1713.31%$1,325,489
AG2-1886.97%$2,789,224
AG2-1986.83%$2,730,042
AG2-2134.42%$1,767,319
AG2-27010.57%$4,228,310
AG2-4405.65%$2,258,912
AG2-4417.06%$2,823,524
AG2-4427.91%$3,162,454
AG2-5661.30%$518,336
AG2-6593.12%$1,246,076
AH1-0565.85%$2,338,325
AH1-37717.14%$6,854,754
AH1-4393.99%$1,594,889

Cost Allocation details for (Pending) / TC2-PH1-DOM-2092


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07715.91%$6,362,337
AG2-1713.31%$1,325,453
AG2-1886.97%$2,789,190
AG2-1986.83%$2,730,058
AG2-2134.42%$1,767,309
AG2-27010.57%$4,228,366
AG2-4405.65%$2,258,869
AG2-4417.06%$2,823,644
AG2-4427.91%$3,162,370
AG2-5661.30%$518,332
AG2-6593.12%$1,246,068
AH1-0565.85%$2,338,371
AH1-37717.14%$6,854,712
AH1-4393.99%$1,594,920

Cost Allocation details for (Pending) / TC2-PH1-DOM-2094


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00524.03%$1,202
AG2-36675.97%$3,798

Cost Allocation details for (Pending) / TC2-PH1-DOM-2095


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$30,020,000

Cost Allocation details for (Pending) / TC2-PH1-DOM-2097


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-3045.10%$1,693,958
AG2-4369.50%$3,157,785
AG2-5707.28%$2,418,025
AG2-5710.92%$306,076
AH1-5282.81%$933,235
AH1-67631.73%$10,543,706
AH1-6810.57%$188,205
AH1-71212.68%$4,212,557
AH1-72314.77%$4,908,903
AH1-72712.14%$4,033,401
AH1-7292.51%$834,149

Cost Allocation details for (Pending) / dom-164


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-09314.04%$3,776,781
AG2-42810.36%$2,786,404
AG2-64657.29%$15,413,876
AH1-0429.22%$2,479,313
AH1-7179.10%$2,447,626

Cost Allocation details for (Pending) / dom-184


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1115.76%$178,807
AG2-1126.04%$187,468
AG2-15214.91%$462,654
AG2-3116.95%$215,619
AG2-54130.90%$959,137
AH1-34335.45%$1,100,315

Cost Allocation details for n6113


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4409.13%$1,004,028
AG2-44111.41%$1,255,091
AG2-44212.78%$1,405,684
AG2-52229.15%$3,206,981
AG2-65925.11%$2,762,363
AH1-40812.42%$1,365,854

Cost Allocation details for n6114


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-2136.60%$1,616,530
AG2-23711.31%$2,770,165
AG2-4405.68%$1,390,489
AG2-4417.09%$1,738,047
AG2-4427.95%$1,946,582
AG2-5226.30%$1,544,444
AG2-6595.81%$1,422,413
AH1-0566.20%$1,519,214
AH1-40843.07%$10,552,115

Cost Allocation details for n6215


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-07712.28%$8,657,819
AG2-1712.37%$1,668,999
AG2-1883.88%$2,735,027
AG2-1983.52%$2,484,894
AG2-2133.16%$2,225,332
AG2-2708.53%$6,014,792
AG2-4403.87%$2,727,254
AG2-4414.83%$3,409,100
AG2-4425.41%$3,818,131
AG2-5413.45%$2,432,523
AG2-5660.67%$471,851
AG2-5819.08%$6,402,670
AG2-6592.05%$1,448,938
AH1-0563.74%$2,641,116
AH1-3433.98%$2,806,257
AH1-3778.75%$6,169,230
AH1-4392.23%$1,574,323
AH1-52818.21%$12,839,745

Cost Allocation details for n6363


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$1,434,318
AG2-42727.56%$2,284,561
AG2-42855.13%$4,569,121

Cost Allocation details for n6365


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42617.31%$2,874,174
AG2-42727.56%$4,577,942
AG2-42855.13%$9,155,884

Cost Allocation details for n6375 / dom-095


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$6,272,000

Cost Allocation details for n6388


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.62%$4,957,354
AG2-42726.46%$7,892,826
AG2-42856.91%$16,973,820

Cost Allocation details for n6389


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.62%$3,148,877
AG2-42726.46%$5,013,469
AG2-42856.91%$10,781,654

Cost Allocation details for n6551 / dom-159


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-09314.04%$3,904,807
AG2-42810.36%$2,880,858
AG2-64657.29%$15,936,381
AH1-0429.22%$2,563,357
AH1-7179.10%$2,530,597

Cost Allocation details for n7509 / dom-261


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$192,000

Cost Allocation details for n7511 / dom-367


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$8,864,000

Cost Allocation details for n7543 / dom-426


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17118.98%$69,836
AG2-21325.30%$93,113
AG2-4409.07%$33,360
AG2-44111.33%$41,700
AG2-44212.69%$46,705
AH1-05613.55%$49,867
AH1-2805.48%$20,160
AH1-3963.60%$13,260

Cost Allocation details for n7556 / dom-461-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00529.97%$4,942,903
AG2-21570.03%$11,550,348

Cost Allocation details for n7568 / dom-369-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.05%$386,666
AG2-0691.58%$580,093
AG2-0772.99%$1,098,680
AG2-0883.93%$1,445,217
AG2-1515.51%$2,028,498
AG2-1712.07%$763,488
AG2-1887.02%$2,583,932
AG2-1982.44%$898,502
AG2-2131.89%$693,918
AG2-2703.66%$1,346,206
AG2-3380.72%$263,278
AG2-3391.79%$658,101
AG2-3690.22%$79,602
AG2-4281.99%$733,766
AG2-4367.21%$2,654,439
AG2-4402.60%$958,602
AG2-4413.26%$1,198,253
AG2-4423.65%$1,341,987
AG2-5661.51%$556,372
AG2-5701.76%$647,038
AG2-5710.70%$258,778
AG2-5811.90%$699,918
AG2-5835.91%$2,176,826
AH1-0563.43%$1,260,884
AH1-2172.89%$1,062,957
AH1-2415.51%$2,028,498
AH1-3775.14%$1,891,795
AH1-4394.16%$1,531,101
AH1-5283.49%$1,285,543
AH1-5464.76%$1,751,062
AH1-6875.27%$1,938,019

Cost Allocation details for n7569 / dom-490-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.05%$140,371
AG2-0691.58%$210,591
AG2-0772.99%$398,854
AG2-0883.93%$524,657
AG2-1515.51%$736,406
AG2-1712.07%$277,169
AG2-1887.02%$938,045
AG2-1982.44%$326,183
AG2-2131.89%$251,913
AG2-2703.66%$488,713
AG2-3380.72%$95,578
AG2-3391.79%$238,911
AG2-3690.22%$28,898
AG2-4281.99%$266,379
AG2-4367.21%$963,641
AG2-4402.60%$348,002
AG2-4413.26%$435,002
AG2-4423.65%$487,182
AG2-5661.51%$201,980
AG2-5701.76%$234,894
AG2-5710.70%$93,944
AG2-5811.90%$254,091
AG2-5835.91%$790,253
AH1-0563.43%$457,739
AH1-2172.89%$385,885
AH1-2415.51%$736,406
AH1-3775.14%$686,779
AH1-4394.16%$555,836
AH1-5283.49%$466,691
AH1-5464.76%$635,688
AH1-6875.27%$703,559

Cost Allocation details for n7575 / dom-286-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0051.51%$507,832
AG2-2156.65%$2,231,729
AG2-3668.45%$2,836,970
AG2-46924.82%$8,328,809
AG2-64610.37%$3,480,988
AH1-04210.85%$3,640,752
AH1-1576.96%$2,335,342
AH1-71630.39%$10,197,269

Cost Allocation details for n7576 / dom-281-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0051.51%$540,761
AG2-2156.65%$2,376,443
AG2-3668.45%$3,020,931
AG2-46924.82%$8,868,884
AG2-64610.37%$3,706,710
AH1-04210.85%$3,876,834
AH1-1576.96%$2,486,776
AH1-71630.39%$10,858,503

Cost Allocation details for n7612 / dom-015-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.29%$1,639,260
AG2-42723.08%$2,322,149
AG2-42860.63%$6,099,939

Cost Allocation details for n7615 / dom-187


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.61%$3,046,494
AG2-42726.46%$4,852,410
AG2-42856.92%$10,437,096

Cost Allocation details for n7616 / dom-172


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42616.62%$69,148
AG2-42726.46%$110,093
AG2-42856.91%$236,759

Cost Allocation details for n7643 / dom-480


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-09315.39%$1,693,296
AG2-64684.61%$9,306,704

Cost Allocation details for n7675 / dom-393


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17118.97%$7,697,286
AG2-21325.29%$10,263,235
AG2-4409.07%$3,680,250
AG2-44111.34%$4,600,172
AG2-44212.70%$5,152,162
AH1-05613.55%$5,499,080
AH1-2805.48%$2,222,222
AH1-3963.60%$1,461,593

Cost Allocation details for n7685 / dom-283-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-32017.57%$2,754,607
AG2-43628.92%$4,533,421
AG2-46914.48%$2,269,796
AH1-52816.99%$2,663,815
AH1-6823.99%$625,185
AH1-6834.75%$744,185
AH1-6914.94%$773,934
AH1-6924.94%$773,934
AH1-6943.42%$535,936

Cost Allocation details for n7687 / dom-046-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1113.79%$401,172
AG2-1123.97%$420,554
AG2-1715.55%$588,191
AG2-2136.54%$693,355
AG2-4406.92%$732,873
AG2-4418.65%$916,066
AG2-4429.68%$1,026,062
AG2-54120.37%$2,157,893
AH1-0565.89%$623,682
AH1-34323.39%$2,478,216
AH1-4085.26%$557,785

Cost Allocation details for n7796 / dom-302/3


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0773.84%$2,045,039
AG2-1517.71%$4,103,123
AG2-1889.29%$4,948,039
AG2-1982.79%$1,483,407
AG2-2703.14%$1,672,909
AG2-4402.85%$1,518,311
AG2-4413.56%$1,897,844
AG2-4423.99%$2,125,600
AG2-5660.70%$370,896
AG2-5812.94%$1,564,320
AG2-58312.40%$6,600,676
AH1-0563.97%$2,113,965
AH1-2174.11%$2,185,535
AH1-2417.71%$4,103,123
AH1-3775.59%$2,974,570
AH1-4395.55%$2,955,532
AH1-5285.88%$3,128,287
AH1-5466.62%$3,522,452
AH1-6877.37%$3,924,374

Cost Allocation details for n7827 / dom-454


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-44025.22%$4,529,233
AG2-44131.53%$5,661,541
AG2-44235.31%$6,340,903
AH1-2157.94%$1,426,723

Cost Allocation details for n8238 / dom-294


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-09316.97%$909,500
AG2-42821.10%$1,130,458
AG2-43625.61%$1,372,065
AG2-57019.06%$1,021,104
AG2-5712.41%$129,230
AH1-52814.85%$795,643

Cost Allocation details for n8239 / dom-300


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-09316.97%$5,702,110
AG2-42821.10%$7,087,410
AG2-43625.61%$8,602,165
AG2-57019.06%$6,401,818
AG2-5712.41%$810,209
AH1-52814.85%$4,988,288

Cost Allocation details for n8243 / dom-389


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0773.85%$847,583
AG2-1517.70%$1,697,936
AG2-1889.29%$2,047,833
AG2-1982.79%$614,270
AG2-2703.15%$693,450
AG2-4402.85%$628,852
AG2-4413.57%$786,047
AG2-4423.99%$880,393
AG2-5660.70%$153,549
AG2-5812.94%$648,319
AG2-58312.39%$2,731,003
AH1-0563.97%$875,362
AH1-2174.10%$904,453
AH1-2417.70%$1,697,936
AH1-3775.59%$1,231,893
AH1-4395.55%$1,223,144
AH1-5285.88%$1,296,492
AH1-5466.61%$1,457,624
AH1-6877.37%$1,623,860

Cost Allocation details for n8256 / dom-277


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0773.85%$863,806
AG2-1517.70%$1,725,982
AG2-1889.29%$2,082,094
AG2-1982.79%$625,065
AG2-2703.15%$706,892
AG2-4402.86%$640,172
AG2-4413.57%$800,196
AG2-4424.00%$896,240
AG2-5660.70%$156,248
AG2-5812.95%$660,684
AG2-58312.38%$2,775,508
AH1-0563.97%$890,760
AH1-2174.10%$919,418
AH1-2417.70%$1,725,982
AH1-3775.59%$1,253,981
AH1-4395.55%$1,243,540
AH1-5285.89%$1,321,293
AH1-5466.61%$1,481,614
AH1-6877.36%$1,650,524

Cost Allocation details for n8296 / dom-266


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-15113.85%$2,423,123
AG2-1889.36%$1,637,293
AG2-1983.12%$545,492
AG2-4403.30%$577,356
AG2-4414.12%$721,694
AG2-4424.62%$808,298
AG2-5661.93%$337,562
AG2-5837.88%$1,379,253
AH1-0564.40%$770,307
AH1-2177.97%$1,395,049
AH1-24113.85%$2,423,123
AH1-3776.48%$1,133,605
AH1-4395.56%$972,517
AH1-5466.44%$1,126,252
AH1-6877.14%$1,249,076

Cost Allocation details for n8423 / dom-119


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1115.76%$11,057
AG2-1126.04%$11,593
AG2-15214.92%$28,653
AG2-3116.96%$13,355
AG2-54130.89%$59,308
AH1-34335.43%$68,035

Cost Allocation details for n9132.0 / dom-122


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-11113.48%$1,482,894
AG2-11214.13%$1,554,135
AG2-31134.33%$3,776,023
AH1-34338.06%$4,186,949

Cost Allocation details for n9147.0 / TC1-PH1-DOM-011


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$3,360,000

Cost Allocation details for n9148.0 / TC1-PH1-DOM-013-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00540.95%$15,556,660
AG2-36659.05%$22,436,725

Cost Allocation details for n9150.0 / TC1-PH1-DOM-022


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$1,984,000

Cost Allocation details for n9197.0 / TC1-PH2-DOM-001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-676100.00%$15,904,000

Cost Allocation details for n9198.0 / TC1-PH2-DOM-003-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.70%$14,813
AG2-0691.05%$22,223
AG2-0772.63%$55,670
AG2-0884.25%$89,747
AG2-1513.52%$74,401
AG2-1712.22%$46,851
AG2-1887.52%$159,015
AG2-1982.61%$55,218
AG2-2132.24%$47,443
AG2-2703.89%$82,279
AG2-3380.77%$16,245
AG2-3391.92%$40,615
AG2-3690.52%$10,993
AG2-4282.16%$45,705
AG2-4367.74%$163,599
AG2-4402.66%$56,176
AG2-4413.32%$70,215
AG2-4423.89%$82,225
AG2-5661.62%$34,201
AG2-5701.88%$39,732
AG2-5710.75%$15,890
AG2-5812.04%$43,020
AG2-5836.35%$134,134
AH1-0563.66%$77,366
AH1-2413.52%$74,401
AH1-3775.50%$116,216
AH1-4082.13%$44,930
AH1-4394.46%$94,235
AH1-5283.74%$79,147
AH1-5465.10%$107,827
AH1-6875.65%$119,347

Cost Allocation details for n9202.0 / TC1-PH2-DOM-007


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0777.75%$31,019
AG2-2706.83%$27,316
AG2-3824.60%$18,393
AG2-4405.33%$21,315
AG2-4416.66%$26,644
AG2-4427.46%$29,840
AG2-5227.82%$31,297
AG2-6597.17%$28,669
AH1-0408.39%$33,575
AH1-2712.63%$10,509
AH1-40823.75%$95,005
AH1-52811.60%$46,418

Cost Allocation details for n9203.0 / TC1-PH2-DOM-008-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.07%$316,942
AG2-0691.61%$475,489
AG2-0773.05%$900,563
AG2-0884.01%$1,184,612
AG2-1515.63%$1,662,714
AG2-1887.17%$2,117,991
AG2-1982.49%$736,482
AG2-2131.93%$568,789
AG2-2703.74%$1,103,455
AG2-3380.73%$215,803
AG2-3391.83%$539,431
AG2-3690.22%$65,248
AG2-4282.04%$601,451
AG2-4367.37%$2,175,784
AG2-4402.66%$785,745
AG2-4413.32%$982,181
AG2-4423.72%$1,099,996
AG2-5661.54%$456,045
AG2-5701.80%$530,362
AG2-5710.72%$212,114
AG2-5811.94%$573,707
AG2-5836.04%$1,784,295
AH1-0563.50%$1,033,519
AH1-2172.95%$871,282
AH1-2415.63%$1,662,714
AH1-3775.25%$1,550,662
AH1-4394.25%$1,255,009
AH1-5283.57%$1,053,731
AH1-5464.86%$1,435,306
AH1-6875.38%$1,588,551

Cost Allocation details for n9205.0 / TC1-PH2-DOM-015


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0777.76%$31,042
AG2-2706.83%$27,336
AG2-3824.60%$18,389
AG2-4405.33%$21,319
AG2-4416.66%$26,649
AG2-4427.46%$29,844
AG2-5227.82%$31,283
AG2-6597.16%$28,659
AH1-0408.40%$33,599
AH1-2712.63%$10,507
AH1-40823.73%$94,919
AH1-52811.61%$46,453

Cost Allocation details for n9215.0 / TC1-PH2-DOM-026


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-52230.28%$90,851
AG2-65926.21%$78,642
AH1-40843.50%$130,507

Cost Allocation details for n9221.0 / TC1-PH3-DOM-015-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.56%$11,624
AG2-0690.85%$17,436
AG2-0776.22%$127,897
AG2-1712.07%$42,650
AG2-1889.33%$191,886
AG2-1983.81%$78,462
AG2-2132.76%$56,868
AG2-2703.89%$80,033
AG2-3380.36%$7,356
AG2-3390.89%$18,392
AG2-3411.01%$20,843
AG2-3690.49%$9,996
AG2-4363.72%$76,439
AG2-4403.81%$78,406
AG2-4414.76%$98,006
AG2-4425.34%$109,766
AG2-5221.27%$26,214
AG2-5411.04%$21,431
AG2-5661.36%$27,902
AG2-5700.94%$19,429
AG2-5710.38%$7,773
AG2-5814.75%$97,645
AG2-6591.40%$28,784
AH1-0564.38%$90,107
AH1-2151.08%$22,192
AH1-3140.77%$15,905
AH1-3431.19%$24,554
AH1-3778.28%$170,330
AH1-4081.48%$30,369
AH1-4395.82%$119,784
AH1-5289.52%$195,806
AH1-5466.47%$133,048

Cost Allocation details for n9222.0 / TC1-PH2-DOM-036-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00540.95%$17,344,099
AG2-36659.05%$25,012,771

Cost Allocation details for n9248.0 / TC1-PH2-DOM-042


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0883.17%$10,967,705
AG2-3380.80%$2,748,846
AG2-3391.99%$6,872,339
AG2-4285.13%$17,734,681
AG2-43615.19%$52,507,120
AG2-5707.38%$25,532,306
AG2-5711.44%$4,965,737
AH1-5286.73%$23,286,172
AH1-6810.67%$2,301,272
AH1-71214.90%$51,504,150
AH1-71625.26%$87,327,776
AH1-72317.36%$60,017,895

Cost Allocation details for n9249.0 / TC1-PH2-DOM-043


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0680.94%$2,162,271
AG2-0691.40%$3,243,406
AG2-0773.49%$8,054,092
AG2-3691.10%$2,549,532
AG2-43618.19%$42,020,468
AG2-4400.56%$1,283,978
AG2-4410.69%$1,605,066
AG2-4421.20%$2,762,902
AG2-5702.39%$5,515,652
AG2-5710.96%$2,206,261
AG2-5812.80%$6,460,118
AH1-5288.01%$18,504,880
AH1-6810.57%$1,323,268
AH1-71212.82%$29,616,268
AH1-71629.95%$69,191,915
AH1-72314.94%$34,511,925

Cost Allocation details for n9256.0 / TC1-PH2-DOM-049


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42821.01%$24,370,315
AG2-46923.27%$26,998,306
AH1-04221.09%$24,468,558
AH1-6826.27%$7,269,956
AH1-6837.46%$8,657,633
AH1-6917.76%$9,001,482
AH1-6927.76%$9,001,482
AH1-6945.37%$6,232,268

Cost Allocation details for n9261.0 / TC1-PH2-DOM-060


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0105.47%$2,188,067
AG2-4288.16%$3,263,616
AG2-43614.41%$5,763,027
AG2-57010.67%$4,267,154
AG2-5711.35%$540,085
AG2-64617.33%$6,931,960
AH1-0405.37%$2,149,366
AH1-04210.68%$4,270,813
AH1-1578.17%$3,266,697
AH1-2164.64%$1,857,469
AH1-5288.39%$3,354,305
AH1-7175.37%$2,147,440

Cost Allocation details for n9305.0 / TC1-PH2-DOM-037


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1712.71%$3,303,063
AG2-2133.62%$4,404,084
AG2-3410.21%$259,794
AG2-44018.97%$23,109,441
AG2-44123.72%$28,886,885
AG2-44226.56%$32,353,277
AH1-05618.97%$23,109,441
AH1-2154.32%$5,262,957
AH1-2800.54%$659,877
AH1-4080.37%$451,180

Cost Allocation details for n9376.0 / TC1-PH3-DOM-003-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0779.33%$6,468,244
AG2-1511.19%$827,471
AG2-1711.97%$1,365,259
AG2-1883.67%$2,546,266
AG2-1985.61%$3,889,072
AG2-2132.63%$1,820,365
AG2-2707.55%$5,231,403
AG2-4403.28%$2,275,471
AG2-4414.10%$2,844,324
AG2-4424.60%$3,185,624
AG2-5661.20%$829,075
AG2-5817.16%$4,964,291
AG2-5831.23%$849,686
AH1-0563.28%$2,275,471
AH1-2151.03%$716,753
AH1-2170.64%$446,731
AH1-2411.13%$785,596
AH1-2800.66%$455,106
AH1-37717.85%$12,372,387
AH1-4392.11%$1,462,909
AH1-52814.32%$9,928,404
AH1-5461.23%$852,477
AH1-6763.36%$2,328,929
AH1-6870.87%$602,472

Cost Allocation details for n9643.0 / TC1-PH3-DOM-009-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1711.28%$5,003
AG2-2131.70%$6,671
AG2-44019.22%$75,261
AG2-44124.02%$94,077
AG2-44226.90%$105,366
AH1-05619.22%$75,261
AH1-2157.66%$30,003

Cost Allocation details for n9644.0 / TC1-PH3-DOM-006-TC2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0681.05%$88,418
AG2-0691.58%$132,648
AG2-0772.99%$251,231
AG2-0883.93%$330,472
AG2-1515.51%$463,849
AG2-1712.07%$174,584
AG2-1887.02%$590,858
AG2-1982.44%$205,457
AG2-2131.89%$158,676
AG2-2703.66%$307,832
AG2-3380.72%$60,203
AG2-3391.79%$150,486
AG2-3690.22%$18,202
AG2-4281.99%$167,787
AG2-4367.21%$606,981
AG2-4402.60%$219,200
AG2-4413.26%$274,000
AG2-4423.65%$306,867
AG2-5661.51%$127,223
AG2-5701.76%$147,956
AG2-5710.70%$59,174
AG2-5811.90%$160,048
AG2-5835.91%$497,767
AH1-0563.43%$288,322
AH1-2172.89%$243,062
AH1-2415.51%$463,849
AH1-3775.14%$432,590
AH1-4394.16%$350,111
AH1-5283.49%$293,960
AH1-5464.76%$400,409
AH1-6875.27%$443,160

Cost Allocation details for n9677.0 / dom-429


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-00524.03%$840,124
AG2-36675.97%$2,655,876

Cost Allocation details for (Pending) / EKPC-tc-nu043


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1792.39%$3,592
AH1-42776.36%$114,541
AH1-72121.24%$31,867

Cost Allocation details for (Pending) / EKPC-tc1-r0021a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1792.39%$49,930
AH1-42776.36%$1,592,118
AH1-72121.24%$442,952

Cost Allocation details for (Pending) / EKPC-tc2-nu001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-239100.00%$6,035,000

Cost Allocation details for (Pending) / EKPC-tc2-nu002


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-239100.00%$105,000

Cost Allocation details for (Pending) / EKPC-tc2-nu003


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1791.10%$172,619
AG2-2980.50%$78,102
AG2-4240.08%$12,126
AG2-6700.57%$90,148
AH1-0341.89%$296,637
AH1-2392.47%$388,355
AH1-4271.52%$239,579
AH1-72191.88%$14,452,434

Cost Allocation details for (Pending) / EKPC-tc2-nu004


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$6,480,000

Cost Allocation details for (Pending) / EKPC-tc2-nu005


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$4,555,000

Cost Allocation details for (Pending) / EKPC-tc2-nu006


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$220,000

Cost Allocation details for (Pending) / EKPC-tc2-nu007


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-66455.56%$361,130
AH1-66544.44%$288,870

Cost Allocation details for (Pending) / EKPC-tc2-nu008


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-721100.00%$6,700,000

Cost Allocation details for (Pending) / EKPC-tc2-nu009


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-073100.00%$7,480,000

Cost Allocation details for (Pending) / EKPC-tc2-nu010


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$12,425,000

Cost Allocation details for (Pending) / EKPC-tc2-nu011


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1797.03%$407,416
AG2-4243.59%$208,056
AG2-6705.13%$297,402
AH1-03459.55%$3,450,687
AH1-23910.04%$582,014
AH1-72114.66%$849,424

Cost Allocation details for (Pending) / EKPC-tc2-nu012


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$19,105,000

Cost Allocation details for (Pending) / EKPC-tc2-nu013


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$220,000

Cost Allocation details for (Pending) / EKPC-tc2-nu014


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-424100.00%$265,000

Cost Allocation details for (Pending) / EKPC-tc2-nu016


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-721100.00%$35,000

Cost Allocation details for (Pending) / EKPC-tc2-nu017


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$5,710,000

Cost Allocation details for (Pending) / EKPC-tc2-nu018


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$105,000

Cost Allocation details for (Pending) / EKPC-tc2-nu019


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$220,000

Cost Allocation details for (Pending) / EKPC-tc2-nu020


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$10,000

Cost Allocation details for (Pending) / EKPC-tc2-nu021


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-29893.72%$32,802
AG2-4246.28%$2,198

Cost Allocation details for (Pending) / EKPC-tc2-nu022


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1793.09%$277,116
AH1-03486.05%$7,714,660
AH1-2394.42%$395,847
AH1-7216.44%$577,377

Cost Allocation details for (Pending) / EKPC-tc2-nu023


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$220,000

Cost Allocation details for (Pending) / EKPC-tc2-nu024


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-66455.56%$100,005
AH1-66544.44%$79,995

Cost Allocation details for (Pending) / EKPC-tc2-nu025


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17978.91%$3,393,236
AH1-03421.09%$906,764

Cost Allocation details for (Pending) / EKPC-tc2-nu026


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-179100.00%$8,455,000

Cost Allocation details for (Pending) / EKPC-tc2-nu027


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-298100.00%$14,555,000

Cost Allocation details for (Pending) / EKPC-tc2-nu028


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$260,000

Cost Allocation details for (Pending) / EKPC-tc2-nu029


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$4,335,000

Cost Allocation details for (Pending) / EKPC-tc2-nu030


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-427100.00%$220,000

Cost Allocation details for (Pending) / EKPC-tc2-nu031


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-23988.60%$2,117,433
AH1-72111.40%$272,567

Cost Allocation details for (Pending) / EKPC-tc2-nu032


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-0345.27%$65,576
AH1-23994.73%$1,179,424

Cost Allocation details for (Pending) / EKPC-tc2-nu033


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-0345.27%$5,531
AH1-23994.73%$99,469

Cost Allocation details for (Pending) / EKPC-tc2-nu034


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-0345.27%$50,565
AH1-23994.73%$909,435

Cost Allocation details for (Pending) / EKPC-tc2-nu036


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$220,000

Cost Allocation details for (Pending) / EKPC-tc2-nu037


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$3,130,000

Cost Allocation details for (Pending) / EKPC-tc2-nu038


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$10,000

Cost Allocation details for (Pending) / EKPC-tc2-nu040


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$9,870,000

Cost Allocation details for (Pending) / EKPC-tc2-nu041


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1792.39%$2,395
AH1-42776.36%$76,361
AH1-72121.24%$21,245

Cost Allocation details for (Pending) / EKPC-tc2-nu042


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1792.39%$2,514
AH1-42776.36%$80,179
AH1-72121.24%$22,307

Cost Allocation details for (Pending) / EKPC-tc2-nu044


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1792.40%$83,139
AH1-42776.29%$2,643,545
AH1-72121.31%$738,316

Cost Allocation details for (Pending) / EKPC-tc2-nu045


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-17978.91%$1,179,741
AH1-03421.09%$315,259

Cost Allocation details for (Pending) / EKPC-tc2-nu046


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-239100.00%$4,215,000

Cost Allocation details for (Pending) / EKPC-tc2-nu901


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42443.02%$0
AG2-67056.98%$0

Cost Allocation details for (Pending) / r0067


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$125,000

Cost Allocation details for n6232.1 / EKPC-tc1-r0003b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1793.60%$12,414
AG2-6702.08%$7,172
AH1-0342.39%$8,230
AH1-2393.41%$11,752
AH1-4272.18%$7,510
AH1-72186.35%$297,922

Cost Allocation details for n6460.3


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0738.04%$594,871
AG2-0813.74%$276,792
AG2-15911.38%$841,783
AH1-0044.99%$369,157
AH1-66412.52%$926,375
AH1-66510.02%$741,141
AH1-66610.20%$754,465
AH1-72139.13%$2,895,415

Cost Allocation details for n6463.3 / EKPC-tc1-r0007a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0738.04%$434,095
AG2-0813.74%$201,983
AG2-15911.38%$614,274
AH1-0044.99%$269,385
AH1-66412.52%$676,004
AH1-66510.02%$540,832
AH1-66610.20%$550,556
AH1-72139.13%$2,112,871

Cost Allocation details for n6480.1 / EKPC-tc1-r0002a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-66440.88%$6,380,689
AH1-66532.70%$5,104,602
AH1-66626.42%$4,124,709

Cost Allocation details for n6833.1 / EKPC-tc1-r0011a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-721100.00%$1,155,000

Cost Allocation details for n6834.1 / EKPC-tc1-r0001a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42482.92%$4,631,163
AG2-6709.90%$552,957
AH1-7217.18%$400,879

Cost Allocation details for n7771.1 / r0013


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1790.69%$241
AH1-2390.76%$264
AH1-72198.56%$34,495

Cost Allocation details for n7771.2 / EKPC-tc1-r0014a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1790.69%$3,546
AH1-2390.76%$3,892
AH1-72198.56%$507,562

Cost Allocation details for n8356 / r0050


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$150,000

Cost Allocation details for n8364.1 / EKPC-tc1-r0009b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1794.79%$9,590
AG2-67013.24%$26,470
AH1-0345.31%$10,621
AH1-2394.57%$9,140
AH1-72172.09%$144,180

Cost Allocation details for n8368.2 / EKPC-tc1-r0012b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1791.59%$164,815
AG2-6701.33%$137,359
AH1-0341.57%$162,401
AH1-2392.11%$218,122
AH1-4270.98%$101,011
AH1-72192.42%$9,551,291

Cost Allocation details for n8368.3 / EKPC-tc1-r0012c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1791.59%$159
AG2-6701.33%$133
AH1-0341.57%$157
AH1-2392.11%$211
AH1-4270.98%$98
AH1-72192.42%$9,242

Cost Allocation details for n8368.4 / EKPC-tc1-r0012d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1791.59%$558
AG2-6701.33%$465
AH1-0341.57%$550
AH1-2392.11%$739
AH1-4270.98%$342
AH1-72192.42%$32,346

Cost Allocation details for n8369 / EKPC-tc1-r0015a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1794.79%$423,137
AG2-67013.24%$1,168,004
AH1-0345.31%$468,635
AH1-2394.57%$403,283
AH1-72172.09%$6,361,942

Cost Allocation details for n9128.0 / EKPC-tc1-r0005c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-42415.06%$55,718
AG2-67016.48%$60,989
AH1-72168.46%$253,293

Cost Allocation details for n9668.0 / r0004


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-03461.15%$256,828
AH1-23938.85%$163,172

Cost Allocation details for n9673.0 / EKPC-tc1-r0020b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-0736.85%$88,738
AG2-0814.55%$58,861
AH1-0046.06%$78,477
AH1-4278.69%$112,578
AH1-66413.69%$177,304
AH1-66510.97%$142,002
AH1-66610.20%$132,043
AH1-72139.00%$504,997

Cost Allocation details for n9678.0 / EKPC-r0114a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-034100.00%$720,000

Cost Allocation details for (Pending) / TC2-ME-001


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-695100.00%$62,051,618

Cost Allocation details for (Pending) / TC2-ME-002


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-695100.00%$29,829,326

Cost Allocation details for (Pending) / 220-97 Upgrades


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34763.36%$12,512,705
AH1-5848.88%$1,753,348
AH1-5858.88%$1,753,348
AH1-5869.29%$1,834,842
AH1-6349.60%$1,895,756

Cost Allocation details for (Pending) / Chichester1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34763.36%$475,166
AH1-5848.88%$66,583
AH1-5858.88%$66,583
AH1-5869.29%$69,678
AH1-6349.60%$71,991

Cost Allocation details for n6471 / pe002


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34735.57%$16,005
AG2-61611.20%$5,039
AH1-5844.85%$2,180
AH1-5854.85%$2,180
AH1-5865.07%$2,282
AH1-6345.39%$2,425
AH1-6413.36%$1,512
AH1-71029.73%$13,377

Cost Allocation details for n6473 / pe003


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34735.57%$801,666
AG2-61611.20%$252,404
AH1-5844.85%$109,208
AH1-5854.85%$109,208
AH1-5865.07%$114,295
AH1-6345.39%$121,466
AH1-6413.36%$75,728
AH1-71029.73%$670,025

Cost Allocation details for n6474 / pe004


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34735.57%$267,459
AG2-61611.20%$84,209
AH1-5844.85%$36,435
AH1-5854.85%$36,435
AH1-5865.07%$38,132
AH1-6345.39%$40,525
AH1-6413.36%$25,265
AH1-71029.73%$223,540

Cost Allocation details for n7159 / pe023


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34763.24%$7,525,119
AH1-5848.92%$1,061,874
AH1-5858.92%$1,061,874
AH1-5869.34%$1,111,076
AH1-6349.58%$1,140,057

Cost Allocation details for n7163 / pe022


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34763.24%$2,529,452
AH1-5848.92%$356,932
AH1-5858.92%$356,932
AH1-5869.34%$373,471
AH1-6349.58%$383,213

Cost Allocation details for n7195 / pe025


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-28112.87%$579,284
AG2-34727.15%$1,221,684
AH1-5846.88%$309,388
AH1-5856.88%$309,388
AH1-58610.31%$464,082
AH1-6343.96%$178,389
AH1-67214.34%$645,388
AH1-71017.61%$792,397

Cost Allocation details for n7866 / pe042


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-34763.35%$3,326,102
AH1-5848.88%$466,093
AH1-5858.88%$466,093
AH1-5869.29%$487,752
AH1-6349.60%$503,959

Cost Allocation details for (Pending) / PN-AF2-F-0017C


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-31336.65%$133,609
AH1-58834.74%$126,652
AH1-58928.61%$104,302

Cost Allocation details for (Pending) / PN-AF2-F-0039B


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-41115.58%$2,705,304
AH1-20111.38%$1,975,794
AH1-20327.06%$4,696,840
AH1-2055.29%$918,859
AH1-46014.93%$2,592,415
AH1-58814.12%$2,450,740
AH1-58911.63%$2,018,521

Cost Allocation details for (Pending) / PN-AG1-F-0011


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-587100.00%$8,857,754

Cost Allocation details for (Pending) / TC2-PN-001.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4566.55%$45,647
AG2-4576.55%$45,647
AH1-31322.13%$154,251
AH1-3571.64%$11,410
AH1-3581.90%$13,273
AH1-3591.64%$11,410
AH1-3601.90%$13,273
AH1-58721.85%$152,276
AH1-58819.65%$136,947
AH1-58916.18%$112,797

Cost Allocation details for (Pending) / TC2-PN-001.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4566.55%$7,030,471
AG2-4576.55%$7,030,471
AH1-31322.13%$23,757,593
AH1-3571.64%$1,757,333
AH1-3581.90%$2,044,337
AH1-3591.64%$1,757,333
AH1-3601.90%$2,044,337
AH1-58721.85%$23,453,505
AH1-58819.65%$21,092,551
AH1-58916.18%$17,372,882

Cost Allocation details for (Pending) / TC2-PN-003.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-45610.15%$76,394
AG2-45710.15%$76,394
AH1-3133.55%$26,714
AH1-3572.54%$19,098
AH1-3582.95%$22,207
AH1-3592.54%$19,098
AH1-3602.95%$22,207
AH1-5879.61%$72,270
AH1-58830.46%$229,183
AH1-58925.09%$188,765

Cost Allocation details for (Pending) / TC2-PN-005.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1766.20%$53,906
AG2-4115.51%$47,925
AG2-4293.36%$29,251
AG2-4565.02%$43,671
AG2-4575.02%$43,671
AH1-0501.69%$14,718
AH1-0511.02%$8,832
AH1-1025.04%$43,862
AH1-1581.18%$10,270
AH1-2012.54%$22,083
AH1-2035.55%$48,258
AH1-2051.18%$10,270
AH1-2682.15%$18,666
AH1-3134.08%$35,518
AH1-3571.26%$10,917
AH1-3581.46%$12,693
AH1-3591.26%$10,917
AH1-3601.46%$12,693
AH1-4605.79%$50,403
AH1-58711.77%$102,341
AH1-58815.06%$131,011
AH1-58912.41%$107,905

Cost Allocation details for (Pending) / TC2-PN-005.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1766.20%$3,275
AG2-4115.51%$2,912
AG2-4293.36%$1,777
AG2-4565.02%$2,653
AG2-4575.02%$2,653
AH1-0501.69%$894
AH1-0511.02%$537
AH1-1025.04%$2,665
AH1-1581.18%$624
AH1-2012.54%$1,342
AH1-2035.55%$2,932
AH1-2051.18%$624
AH1-2682.15%$1,134
AH1-3134.08%$2,158
AH1-3571.26%$663
AH1-3581.46%$771
AH1-3591.26%$663
AH1-3601.46%$771
AH1-4605.79%$3,062
AH1-58711.77%$6,218
AH1-58815.06%$7,960
AH1-58912.41%$6,556

Cost Allocation details for (Pending) / TC2-PN-006


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-41830.97%$112,898
AH1-31325.30%$92,232
AH1-58823.98%$87,430
AH1-58919.75%$72,001

Cost Allocation details for (Pending) / TC2-PN-007.a


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.79%$5,994
AG2-4115.25%$5,430
AG2-4293.38%$3,502
AG2-4564.47%$4,628
AG2-4574.47%$4,628
AH1-0501.76%$1,826
AH1-0511.06%$1,096
AH1-1026.52%$6,750
AH1-1404.92%$5,088
AH1-1581.23%$1,274
AH1-2012.44%$2,521
AH1-2035.32%$5,506
AH1-2051.13%$1,173
AH1-2682.77%$2,872
AH1-3133.98%$4,125
AH1-3571.12%$1,157
AH1-3581.30%$1,345
AH1-3591.12%$1,157
AH1-3601.30%$1,345
AH1-4605.54%$5,732
AH1-58710.68%$11,057
AH1-58813.41%$13,883
AH1-58911.05%$11,434

Cost Allocation details for (Pending) / TC2-PN-007.b


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.79%$15,237
AG2-4115.25%$13,805
AG2-4293.38%$8,902
AG2-4564.47%$11,764
AG2-4574.47%$11,764
AH1-0501.76%$4,643
AH1-0511.06%$2,786
AH1-1026.52%$17,158
AH1-1404.92%$12,935
AH1-1581.23%$3,239
AH1-2012.44%$6,410
AH1-2035.32%$13,998
AH1-2051.13%$2,981
AH1-2682.77%$7,302
AH1-3133.98%$10,485
AH1-3571.12%$2,941
AH1-3581.30%$3,420
AH1-3591.12%$2,941
AH1-3601.30%$3,420
AH1-4605.54%$14,571
AH1-58710.68%$28,108
AH1-58813.41%$35,291
AH1-58911.05%$29,067

Cost Allocation details for (Pending) / TC2-PN-009


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4563.52%$764,264
AG2-4573.52%$764,264
AH1-3570.88%$191,085
AH1-3581.07%$231,170
AH1-3590.88%$191,085
AH1-3601.07%$231,170
AH1-58769.44%$15,069,776
AH1-58810.57%$2,292,866
AH1-5899.05%$1,964,797

Cost Allocation details for (Pending) / TC2-PN-010


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-45611.69%$1,890,925
AG2-45711.69%$1,890,925
AH1-3572.92%$472,938
AH1-3583.40%$549,967
AH1-3592.92%$472,938
AH1-3603.40%$549,967
AH1-58835.08%$5,673,602
AH1-58928.89%$4,673,060

Cost Allocation details for (Pending) / TC2-PN-011


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.76%$1,644,796
AG2-4115.98%$1,706,593
AG2-4564.37%$1,248,996
AG2-4574.37%$1,248,996
AH1-0501.76%$502,748
AH1-0511.06%$301,709
AH1-1027.48%$2,135,683
AH1-1404.83%$1,379,567
AH1-1581.23%$350,748
AH1-2012.81%$801,866
AH1-2036.12%$1,748,356
AH1-2051.31%$372,975
AH1-2683.18%$908,914
AH1-3134.14%$1,183,213
AH1-3571.09%$312,274
AH1-3581.27%$363,107
AH1-3591.09%$312,274
AH1-3601.27%$363,107
AH1-4606.39%$1,826,300
AH1-58710.55%$3,013,300
AH1-58813.12%$3,747,089
AH1-58910.81%$3,086,260

Cost Allocation details for n6816.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-31336.65%$14,371,061
AH1-58834.74%$13,622,778
AH1-58928.61%$11,218,758

Cost Allocation details for n6816.2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-31336.65%$629,075
AH1-58834.74%$596,320
AH1-58928.61%$491,087

Cost Allocation details for n6817.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.11%$6,270,835
AG2-4188.22%$10,085,515
AG2-4564.68%$5,741,839
AG2-4574.68%$5,741,839
AH1-0501.63%$2,002,833
AH1-0510.98%$1,202,132
AH1-1024.03%$4,938,255
AH1-1581.14%$1,397,443
AH1-2033.84%$4,704,748
AH1-2681.71%$2,101,569
AH1-31315.30%$18,769,262
AH1-3571.17%$1,435,640
AH1-3581.36%$1,669,148
AH1-3591.17%$1,435,640
AH1-3601.36%$1,669,148
AH1-4603.76%$4,608,894
AH1-58714.24%$17,466,952
AH1-58814.04%$17,226,238
AH1-58911.57%$14,188,475

Cost Allocation details for n6820.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-41830.97%$21,692,313
AH1-31325.30%$17,721,593
AH1-58823.98%$16,798,852
AH1-58919.75%$13,834,349

Cost Allocation details for n6820.2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-41830.97%$699,800
AH1-31325.30%$571,703
AH1-58823.98%$541,935
AH1-58919.75%$446,300

Cost Allocation details for n6820.4


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-41830.97%$140,304
AH1-31325.30%$114,622
AH1-58823.98%$108,654
AH1-58919.75%$89,480

Cost Allocation details for n6855.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-45610.15%$80,901
AG2-45710.15%$80,901
AH1-3133.55%$28,290
AH1-3572.54%$20,225
AH1-3582.95%$23,518
AH1-3592.54%$20,225
AH1-3602.95%$23,518
AH1-5879.61%$76,533
AH1-58830.46%$242,704
AH1-58925.09%$199,902

Cost Allocation details for n6855.2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-45610.15%$5,933,100
AG2-45710.15%$5,933,100
AH1-3133.55%$2,074,750
AH1-3572.54%$1,483,232
AH1-3582.95%$1,724,721
AH1-3592.54%$1,483,232
AH1-3602.95%$1,724,721
AH1-5879.61%$5,612,766
AH1-58830.46%$17,799,300
AH1-58925.09%$14,660,295

Cost Allocation details for n6855.3


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-45610.15%$23,355
AG2-45710.15%$23,355
AH1-3133.55%$8,167
AH1-3572.54%$5,839
AH1-3582.95%$6,789
AH1-3592.54%$5,839
AH1-3602.95%$6,789
AH1-5879.61%$22,094
AH1-58830.46%$70,065
AH1-58925.09%$57,709

Cost Allocation details for n6858.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-41115.59%$1,070,543
AH1-20111.39%$781,943
AH1-20327.07%$1,858,896
AH1-2055.30%$363,732
AH1-46014.94%$1,026,033
AH1-58814.11%$968,883
AH1-58911.62%$797,967

Cost Allocation details for n7114.1


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-3133.20%$1,097,446
AH1-58796.80%$33,239,487

Cost Allocation details for n7114.2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-3133.20%$6,477
AH1-58796.80%$196,186

Cost Allocation details for n7114.3


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-3133.20%$1,689
AH1-58796.80%$51,159

Cost Allocation details for n7641


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-418100.00%$33,874,732

Cost Allocation details for n7652


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4567.77%$28,339
AG2-4577.77%$28,339
AH1-3571.94%$7,085
AH1-3582.26%$8,238
AH1-3591.94%$7,085
AH1-3602.26%$8,238
AH1-58733.52%$122,206
AH1-58823.32%$85,013
AH1-58919.21%$70,018

Cost Allocation details for n7763.2


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-41851.25%$26,528
AH1-31348.75%$25,234

Cost Allocation details for n8096


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-2069.40%$152,449
AG2-2206.04%$97,969
AG2-2213.60%$58,378
AG2-3271.96%$31,762
AG2-3563.60%$58,378
AG2-4565.16%$83,645
AG2-4575.16%$83,645
AH1-0053.90%$63,208
AH1-3571.29%$20,920
AH1-3581.50%$24,317
AH1-3591.29%$20,920
AH1-3601.50%$24,317
AH1-58712.78%$207,280
AH1-58815.48%$250,951
AH1-58912.75%$206,697
AH1-72014.60%$236,727

Cost Allocation details for n8229


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-4563.52%$2,186,533
AG2-4573.52%$2,186,533
AH1-3570.88%$546,741
AH1-3581.06%$659,763
AH1-3590.88%$546,741
AH1-3601.06%$659,763
AH1-58769.51%$43,218,927
AH1-58810.55%$6,559,599
AH1-5899.02%$5,608,096

Cost Allocation details for n8281


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.88%$1,841,952
AG2-4115.02%$1,572,439
AG2-4293.42%$1,071,784
AG2-4564.59%$1,437,300
AG2-4574.59%$1,437,300
AH1-0501.79%$559,511
AH1-0511.07%$335,706
AH1-1026.22%$1,948,656
AH1-1404.91%$1,537,125
AH1-1581.25%$390,434
AH1-2012.31%$724,153
AH1-2035.06%$1,583,446
AH1-2051.08%$336,776
AH1-2682.65%$829,329
AH1-3133.95%$1,237,650
AH1-3571.15%$359,401
AH1-3581.33%$417,798
AH1-3591.15%$359,401
AH1-3601.33%$417,798
AH1-4605.25%$1,644,441
AH1-58710.91%$3,416,378
AH1-58813.77%$4,312,053
AH1-58911.34%$3,551,669

Cost Allocation details for n9117.0 / TC1-PN-001.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1766.20%$77,766
AG2-4115.51%$69,137
AG2-4293.36%$42,197
AG2-4565.02%$63,001
AG2-4575.02%$63,001
AH1-0501.69%$21,232
AH1-0511.02%$12,742
AH1-1025.04%$63,276
AH1-1581.18%$14,816
AH1-2012.54%$31,857
AH1-2035.55%$69,617
AH1-2051.18%$14,816
AH1-2682.15%$26,928
AH1-3134.08%$51,239
AH1-3571.26%$15,749
AH1-3581.46%$18,312
AH1-3591.26%$15,749
AH1-3601.46%$18,312
AH1-4605.79%$72,711
AH1-58711.77%$147,639
AH1-58815.06%$188,998
AH1-58912.41%$155,665

Cost Allocation details for n9118.0 / TC1-PN-001.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1766.20%$110,525
AG2-4115.51%$98,262
AG2-4293.36%$59,973
AG2-4565.02%$89,540
AG2-4575.02%$89,540
AH1-0501.69%$30,177
AH1-0511.02%$18,109
AH1-1025.04%$89,932
AH1-1581.18%$21,058
AH1-2012.54%$45,277
AH1-2035.55%$98,945
AH1-2051.18%$21,058
AH1-2682.15%$38,272
AH1-3134.08%$72,824
AH1-3571.26%$22,384
AH1-3581.46%$26,026
AH1-3591.26%$22,384
AH1-3601.46%$26,026
AH1-4605.79%$103,342
AH1-58711.77%$209,834
AH1-58815.06%$268,616
AH1-58912.41%$221,241

Cost Allocation details for n9120.0 / TC1-PN-003.c


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.79%$10,870
AG2-4115.25%$9,849
AG2-4293.38%$6,351
AG2-4564.47%$8,392
AG2-4574.47%$8,392
AH1-0501.76%$3,312
AH1-0511.06%$1,987
AH1-1026.52%$12,241
AH1-1404.92%$9,228
AH1-1581.23%$2,311
AH1-2012.44%$4,573
AH1-2035.32%$9,986
AH1-2051.13%$2,127
AH1-2682.77%$5,209
AH1-3133.98%$7,480
AH1-3571.12%$2,098
AH1-3581.30%$2,440
AH1-3591.12%$2,098
AH1-3601.30%$2,440
AH1-4605.54%$10,395
AH1-58710.68%$20,053
AH1-58813.41%$25,177
AH1-58911.05%$20,737

Cost Allocation details for n9121.0 / TC1-PN-003.d


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.79%$14,924
AG2-4115.25%$13,521
AG2-4293.38%$8,719
AG2-4564.47%$11,522
AG2-4574.47%$11,522
AH1-0501.76%$4,547
AH1-0511.06%$2,729
AH1-1026.52%$16,806
AH1-1404.92%$12,669
AH1-1581.23%$3,173
AH1-2012.44%$6,278
AH1-2035.32%$13,710
AH1-2051.13%$2,920
AH1-2682.77%$7,152
AH1-3133.98%$10,270
AH1-3571.12%$2,881
AH1-3581.30%$3,350
AH1-3591.12%$2,881
AH1-3601.30%$3,350
AH1-4605.54%$14,272
AH1-58710.68%$27,530
AH1-58813.41%$34,566
AH1-58911.05%$28,470

Cost Allocation details for n9124.0 / TC1-PN-003.e


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.79%$63,960
AG2-4115.25%$57,948
AG2-4293.38%$37,367
AG2-4564.47%$49,380
AG2-4574.47%$49,380
AH1-0501.76%$19,488
AH1-0511.06%$11,694
AH1-1026.52%$72,024
AH1-1404.92%$54,297
AH1-1581.23%$13,597
AH1-2012.44%$26,906
AH1-2035.32%$58,758
AH1-2051.13%$12,513
AH1-2682.77%$30,651
AH1-3133.98%$44,014
AH1-3571.12%$12,346
AH1-3581.30%$14,356
AH1-3591.12%$12,346
AH1-3601.30%$14,356
AH1-4605.54%$61,165
AH1-58710.68%$117,987
AH1-58813.41%$148,140
AH1-58911.05%$122,014

Cost Allocation details for n9125.0 / TC1-PN-003.f


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.79%$72,649
AG2-4115.25%$65,820
AG2-4293.38%$42,444
AG2-4564.47%$56,088
AG2-4574.47%$56,088
AH1-0501.76%$22,135
AH1-0511.06%$13,283
AH1-1026.52%$81,809
AH1-1404.92%$61,673
AH1-1581.23%$15,444
AH1-2012.44%$30,561
AH1-2035.32%$66,741
AH1-2051.13%$14,213
AH1-2682.77%$34,815
AH1-3133.98%$49,993
AH1-3571.12%$14,024
AH1-3581.30%$16,306
AH1-3591.12%$14,024
AH1-3601.30%$16,306
AH1-4605.54%$69,474
AH1-58710.68%$134,016
AH1-58813.41%$168,265
AH1-58911.05%$138,590

Cost Allocation details for n9126.0 / TC1-PN-003.h


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.79%$8,845
AG2-4115.25%$8,014
AG2-4293.38%$5,168
AG2-4564.47%$6,829
AG2-4574.47%$6,829
AH1-0501.76%$2,695
AH1-0511.06%$1,617
AH1-1026.52%$9,960
AH1-1404.92%$7,509
AH1-1581.23%$1,880
AH1-2012.44%$3,721
AH1-2035.32%$8,126
AH1-2051.13%$1,731
AH1-2682.77%$4,239
AH1-3133.98%$6,087
AH1-3571.12%$1,707
AH1-3581.30%$1,985
AH1-3591.12%$1,707
AH1-3601.30%$1,985
AH1-4605.54%$8,459
AH1-58710.68%$16,317
AH1-58813.41%$20,487
AH1-58911.05%$16,874

Cost Allocation details for n9127.0 / TC1-PN-003.g


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.79%$103,254
AG2-4115.25%$93,548
AG2-4293.38%$60,324
AG2-4564.47%$79,716
AG2-4574.47%$79,716
AH1-0501.76%$31,460
AH1-0511.06%$18,878
AH1-1026.52%$116,272
AH1-1404.92%$87,654
AH1-1581.23%$21,950
AH1-2012.44%$43,435
AH1-2035.32%$94,856
AH1-2051.13%$20,201
AH1-2682.77%$49,481
AH1-3133.98%$71,054
AH1-3571.12%$19,932
AH1-3581.30%$23,175
AH1-3591.12%$19,932
AH1-3601.30%$23,175
AH1-4605.54%$98,741
AH1-58710.68%$190,471
AH1-58813.41%$239,149
AH1-58911.05%$196,973

Cost Allocation details for (Pending) /


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-43611.73%$703,728
AG2-5709.02%$541,355
AG2-5711.14%$68,527
AH1-5286.94%$416,240
AH1-67635.91%$2,154,606
AH1-6810.71%$42,766
AH1-71215.95%$957,274
AH1-72318.59%$1,115,503

Cost Allocation details for (Pending) /


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-3045.10%$4,408,470
AG2-4369.50%$8,218,034
AG2-5707.28%$6,292,831
AG2-5710.92%$796,553
AH1-5282.81%$2,428,713
AH1-67631.73%$27,439,654
AH1-6810.57%$489,797
AH1-71212.68%$10,963,043
AH1-72314.77%$12,775,261
AH1-72712.14%$10,496,797
AH1-7292.51%$2,170,846

Cost Allocation details for n6818


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-1765.11%$184,051
AG2-4188.22%$296,013
AG2-4564.68%$168,525
AG2-4574.68%$168,525
AH1-0501.63%$58,784
AH1-0510.98%$35,283
AH1-1024.03%$144,939
AH1-1581.14%$41,015
AH1-2033.84%$138,086
AH1-2681.71%$61,682
AH1-31315.30%$550,883
AH1-3571.17%$42,136
AH1-3581.36%$48,990
AH1-3591.17%$42,136
AH1-3601.36%$48,990
AH1-4603.76%$135,272
AH1-58714.24%$512,660
AH1-58814.04%$505,595
AH1-58911.57%$416,436

Cost Allocation details for n7111 / R-PL-0005


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-43022.39%$17,262,849
AH1-70777.61%$59,837,151

Cost Allocation details for n9114.0 / R-PL-0003


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AG2-16139.91%$48,129,277
AG2-43035.70%$43,050,087
AH1-70724.40%$29,420,635

Cost Allocation details for (Pending)


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-71544.53%$4,089,311
AH1-72255.47%$5,093,689

Cost Allocation details for (Pending)


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-71544.53%$3,642,662
AH1-72255.47%$4,537,338

Cost Allocation details for (Pending) / PSEG-TC2-PHQ_LindenGen


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-71530.34%$1,125,072
AH1-72269.66%$2,582,928

Cost Allocation details for (Pending) / PSEG-TC2_PH1_LindenMinueR


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-71544.53%$4,007,832
AH1-72255.47%$4,992,168

Cost Allocation details for (Pending) / PSEG-TC2_PH1_MinueSewarenR


Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AH1-71544.53%$3,710,362
AH1-72255.47%$4,621,638
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.

Note: Additional detail can be found in each of the individual TC2 New Service Request System Impact Study reports also available on PJM.com.