Transition Cycle 2
v1.00 released 2025-10-29 22:40
New Service Requests
System Impact Study Executive Summary Report
Transition Cycle 2 Phase I
Introduction
This Phase I System Impact Study executive summary report has been prepared in accordance with the PJM Open Access Transmission Tariff Part VII, Subpart D, section 309. This report presents an executive summary of Phase I System Impact Study results for New Service Requests (projects) in Transition Cycle 2.
Preface
The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.
In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
- PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
- PJM will only perform load flow analysis during the Phase I System Impact Study.
- In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Requests with Affected System impacts and provides each Affected System Operator with a list of New Service Requests in the Cycle with potential impacts to their respective system.
- PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
- The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
New Services Request List
PJM received 450 New Service Requests in Transition Cycle 2, Phase I with a combined Maximum Facility Output (MFO) of 45,977.6 MW and 33,857.2 MW as Capacity Interconnection Rights (CIRs). All of these New Service Requests are listed in table below.
| Project ID | Project Name / POI | State | Status | Transmission Owner | Maxiumum Facility Output (MFO in MW) | MW Energy (MWE) | MW Capacity (MWC) | Project Type | Resource Type |
|---|---|---|---|---|---|---|---|---|---|
| AG2-005 | Garner DP-Lancaster 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 196.0 | 20.0 | 8.4 | Generation Interconnection | Solar |
| AG2-010 | Peninsula-Whealton 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 75.96 | Generation Interconnection | Storage |
| AG2-014 | Meadow Lake 345 kV | Indiana | Active | American Electric Power | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AG2-016 | Oyster Creek-Whitings 34.5 kV | New Jersey | Active | Jersey Central Power & Light Company | 19.8 | 19.8 | 8.316 | Generation Interconnection | Solar |
| AG2-029 | Forest G. Hipple-Collingwood 345 kV | Indiana | Active | American Electric Power | 300.0 | 300.0 | 39.0 | Generation Interconnection | Solar |
| AG2-037 | Findlay-Midfield 23 kV | Pennsylvania | Active | Duquesne Light Company | 4.7 | 4.7 | 2.82 | Generation Interconnection | Solar |
| AG2-049 | Van Dorn 34.5 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 0.0 | 20.0 | Generation Interconnection | Biomass |
| AG2-057 | Cardington-Liberty 69 kV II | Ohio | Active | American Transmission Systems, Incorporated | 74.0 | 10.0 | 6.0 | Generation Interconnection | Solar |
| AG2-061 | Dana 345 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AG2-062 | William 138 kV | West Virginia | Active | The Potomac Edison Company | 147.0 | 147.0 | 21.609 | Generation Interconnection | Wind |
| AG2-063 | North Hampton 69 kV | Ohio | Active | American Transmission Systems, Incorporated | 54.0 | 54.0 | 34.5 | Generation Interconnection | Solar |
| AG2-068 | Heritage - Wake 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AG2-069 | Heritage - Wake 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 250.0 | 150.0 | 90.0 | Generation Interconnection | Solar |
| AG2-072 | Rockport 765 kV | Indiana | Active | American Electric Power | 700.0 | 700.0 | 700.0 | Generation Interconnection | Natural Gas |
| AG2-073 | Crooksville 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AG2-074 | Meckesville Tap 69kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 38.0 | 38.0 | 26.2 | Generation Interconnection | Solar |
| AG2-077 | Clover-Rawlings 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 700.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AG2-081 | Mt. Sterling-Fogg Pike 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 30.0 | 30.0 | 18.0 | Generation Interconnection | Solar |
| AG2-082 | Nottingham 138 kV | Ohio | Active | American Electric Power | 200.0 | 200.0 | 133.4 | Generation Interconnection | Solar |
| AG2-085 | Delaware-Royerton 138 kV | Indiana | Active | American Electric Power | 140.0 | 40.0 | 24.0 | Generation Interconnection | Solar |
| AG2-086 | Mt. Jackson DP-Mt. Jackson 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 75.0 | 75.0 | 45.0 | Generation Interconnection | Solar; Storage |
| AG2-088 | Midlothian 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 150.0 | 150.0 | 150.0 | Generation Interconnection | Storage |
| AG2-090 | Scalp Level 23 kV IV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 14.0 | 14.0 | 8.4 | Generation Interconnection | Solar |
| AG2-091 | Scalp Level 23 kV V | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 6.0 | 3.6 | Generation Interconnection | Solar |
| AG2-093 | Colonial Trail-Hopewell 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 100.0 | Generation Interconnection | Solar; Storage |
| AG2-095 | Hopewell 34.5 kV (Circuit 313) | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 18.0 | 18.0 | 10.8 | Generation Interconnection | Solar |
| AG2-104 | Marysville-Flatlick 765 kV | Ohio | Active | American Electric Power | 400.0 | 400.0 | 253.7 | Generation Interconnection | Solar |
| AG2-106 | Marysville-Flatlick 765 kV | Ohio | Active | American Electric Power | 400.0 | 0.0 | 150.0 | Generation Interconnection | Storage |
| AG2-107 | Marysville-Flatlick 765 kV | Ohio | Active | American Electric Power | 400.0 | 0.0 | 150.0 | Generation Interconnection | Storage |
| AG2-109 | Fitchville-New London 69 kV | Ohio | Active | American Transmission Systems, Incorporated | 40.0 | 40.0 | 28.1 | Generation Interconnection | Solar |
| AG2-111 | Perth 34.5 kV Substation (Circuit 408) | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 14.5 | 14.5 | 8.7 | Generation Interconnection | Solar |
| AG2-112 | Perth 34.5 kV Substation (Circuit 404) | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 15.2 | 15.2 | 9.12 | Generation Interconnection | Solar |
| AG2-114 | Dresden-Pontiac Midpoint 345 kV | Illinois | Active | Commonwealth Edison Company | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AG2-119 | Galion-Roberts South 138 kV II | Ohio | Active | American Transmission Systems, Incorporated | 80.0 | 80.0 | 53.6 | Generation Interconnection | Solar |
| AG2-120 | Everetts 34.5 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 21.0 | 21.0 | 14.0 | Generation Interconnection | Solar |
| AG2-121 | Mackeys 230 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 140.0 | 0.0 | 0.0 | Generation Interconnection | Storage |
| AG2-124 | Shackleford-Harmony 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 149.9 | 0.0 | 33.34 | Generation Interconnection | Solar |
| AG2-125 | Camden-Crystal 69 kV | Ohio | Active | The Dayton Power and Light Company | 69.9 | 0.0 | 15.44 | Generation Interconnection | Solar |
| AG2-126 | Eugene 345 kV | Indiana | Active | American Electric Power | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar; Storage |
| AG2-148 | S Berwick - Galion 345 kV | Ohio | Active | American Electric Power | 86.0 | 86.0 | 0.0 | Generation Interconnection | Storage |
| AG2-149 | Galion-South Berwick 345 kV | Ohio | Active | American Electric Power | 400.0 | 314.0 | 52.0 | Generation Interconnection | Solar |
| AG2-151 | Trices Lake - James River Tap 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AG2-152 | Banister-Bear Skin 138 kV | Virginia | Active | American Electric Power | 131.0 | 131.0 | 79.0 | Generation Interconnection | Solar |
| AG2-159 | Williamstown 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 61.0 | 61.0 | 57.6 | Generation Interconnection | Solar; Storage |
| AG2-161 | Wheelabrator Frackville-Gilberton 69 kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 43.0 | 43.0 | 18.06 | Generation Interconnection | Solar |
| AG2-162 | Jefferson-Greentown 765 kV | Indiana | Active | American Electric Power | 115.0 | 115.0 | 15.0 | Generation Interconnection | Solar |
| AG2-163 | Dequine-Eugene 345 kV | Indiana | Active | American Electric Power | 700.0 | 250.0 | 35.0 | Generation Interconnection | Solar |
| AG2-164 | Jefferson-Greentown 765 kV | Indiana | Active | American Electric Power | 385.0 | 270.0 | 35.1 | Generation Interconnection | Solar |
| AG2-165 | Dumont-Greentown 765 kV | Indiana | Active | American Electric Power | 200.0 | 200.0 | 26.0 | Generation Interconnection | Solar |
| AG2-166 | Newville-Nottingham Tap 1 69 kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 10.0 | 10.0 | 0.0 | Generation Interconnection | Solar |
| AG2-171 | Lunenburg-Nutbush 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 60.0 | 60.0 | 36.0 | Generation Interconnection | Solar |
| AG2-176 | Geneva 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar |
| AG2-179 | Sewellton Junction 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 60.0 | 60.0 | 57.0 | Generation Interconnection | Solar; Storage |
| AG2-181 | Airey - Golden Hill 69 kV | Maryland | Active | Delmarva Power and Light Company | 28.0 | 28.0 | 2.8 | Generation Interconnection | Solar |
| AG2-182 | Doubs-Bismark 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 200.0 | 200.0 | 133.3333 | Generation Interconnection | Solar; Storage |
| AG2-184 | Harbert Metering 138 kV | Kentucky | Active | American Electric Power | 210.0 | 210.0 | 126.0 | Generation Interconnection | Solar |
| AG2-188 | Farmville - Buckingham 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 140.0 | 140.0 | 89.0 | Generation Interconnection | Solar |
| AG2-191 | Mississinewa 138 kV | Indiana | Active | American Electric Power | 30.0 | 30.0 | 18.0 | Generation Interconnection | Solar; Storage |
| AG2-192 | Mississinewa 138 kV | Indiana | Active | American Electric Power | 19.0 | 19.0 | 11.4 | Generation Interconnection | Solar; Storage |
| AG2-193 | Turner 34.5 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AG2-198 | Briery - Finneywood 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AG2-200 | North Warren–Russell 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AG2-206 | Tennessee Gas-East Towanda 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 48.0 | 48.0 | 28.8 | Generation Interconnection | Solar |
| AG2-208 | Greenwood DP - St. Johns DP 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 70.0 | 70.0 | 44.47 | Generation Interconnection | Solar |
| AG2-212 | Dumont-Greentown 765 kV | Indiana | Active | American Electric Power | 400.0 | 200.0 | 26.0 | Generation Interconnection | Solar |
| AG2-213 | Gary D.P Tap - Gary D.P 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AG2-215 | Garner DP-Lancaster 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 196.0 | 0.0 | 36.92 | Generation Interconnection | Solar |
| AG2-216 | East Sidney-Quincy 138 kV | Ohio | Active | The Dayton Power and Light Company | 144.0 | 0.0 | 25.92 | Generation Interconnection | Solar |
| AG2-219 | Jefferson-Greentown 765 kV | Indiana | Active | American Electric Power | 715.0 | 330.0 | 42.9 | Generation Interconnection | Solar |
| AG2-220 | East Towanda-South Troy 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 31.0 | 31.0 | 19.2 | Generation Interconnection | Solar |
| AG2-221 | South Troy - North Towanda 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 13.2 | Generation Interconnection | Solar |
| AG2-230 | Dumont 345 kV | Indiana | Active | American Electric Power | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar |
| AG2-236 | Potter-Harlan 69 kV | Pennsylvania | Active | American Transmission Systems, Incorporated | 60.0 | 20.0 | 2.0 | Generation Interconnection | Solar |
| AG2-237 | Thelma 230kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 143.0 | 0.0 | 0.0 | Generation Interconnection | Storage |
| AG2-238 | Earleys 230 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 99.9 | 0.0 | 0.0 | Generation Interconnection | Storage |
| AG2-239 | Hickory-Shawboro 230 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 120.0 | 0.0 | 0.0 | Generation Interconnection | Storage |
| AG2-240 | Old Church 34.5 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 25.0 | 0.0 | 0.0 | Generation Interconnection | Storage |
| AG2-245 | Olive - Reynolds #1 345 kV | Indiana | Active | American Electric Power | 210.0 | 210.0 | 126.0 | Generation Interconnection | Solar |
| AG2-248 | East Elkhart – Elcona Tap 138 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 0.0 | Generation Interconnection | Storage |
| AG2-249 | Stoneboro-Perry 69 kV | Pennsylvania | Active | American Transmission Systems, Incorporated | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AG2-250 | Stoneboro-Perry 69 kV II | Pennsylvania | Active | American Transmission Systems, Incorporated | 40.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AG2-262 | Dryburg 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 47.0 | 11.0 | 6.6 | Generation Interconnection | Solar |
| AG2-270 | Clover 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 150.0 | 150.0 | 105.0 | Generation Interconnection | Storage |
| AG2-272 | Berry Hill 138 kV | Virginia | Active | American Electric Power | 55.0 | 55.0 | 21.3 | Generation Interconnection | Storage |
| AG2-279 | Hagerstown-Conservit 34.5 kV | Maryland | Active | The Potomac Edison Company | 20.0 | 20.0 | 12.9 | Generation Interconnection | Solar |
| AG2-281 | Church 138 kV | Maryland | Active | Delmarva Power and Light Company | 50.0 | 50.0 | 50.0 | Generation Interconnection | Storage |
| AG2-288 | Stonewall 138 kV | Virginia | Active | The Potomac Edison Company | 150.0 | 150.0 | 150.0 | Generation Interconnection | Storage |
| AG2-289 | Amsden – Fremont Center 69 kV | Ohio | Active | American Electric Power | 66.6 | 66.6 | 0.0 | Generation Interconnection | Storage |
| AG2-290 | Amsden – Fremont Center 69 kV | Ohio | Active | American Electric Power | 105.0 | 38.4 | 0.0 | Generation Interconnection | Storage |
| AG2-297 | Cumberland 230 kV | New Jersey | Active | Atlantic City Electric | 19.0 | 19.0 | 11.4 | Generation Interconnection | Solar |
| AG2-298 | Sulphur Creek-Loretto 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 60.0 | 60.0 | 40.0 | Generation Interconnection | Solar |
| AG2-300 | Meadow Brook 138 kV | Virginia | Active | The Potomac Edison Company | 100.0 | 100.0 | 70.0 | Generation Interconnection | Storage |
| AG2-304 | Liberty 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 150.0 | 150.0 | 150.0 | Generation Interconnection | Storage |
| AG2-310 | Matt Funk 138 kV | Virginia | Active | American Electric Power | 100.0 | 100.0 | 70.0 | Generation Interconnection | Storage |
| AG2-311 | Smith Mountain 138 kV | Virginia | Active | American Electric Power | 75.0 | 75.0 | 52.5 | Generation Interconnection | Storage |
| AG2-320 | Ladysmith 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 150.0 | 150.0 | 105.0 | Generation Interconnection | Storage |
| AG2-327 | Tennessee Gas-East Towanda 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 58.0 | 10.0 | 6.0 | Generation Interconnection | Solar |
| AG2-328 | Dumont - Greentown 765 kV | Indiana | Active | American Electric Power | 600.0 | 200.0 | 26.0 | Generation Interconnection | Solar |
| AG2-329 | S Berwick - Galion 345 kV | Ohio | Active | American Electric Power | 400.0 | 0.0 | 156.0 | Generation Interconnection | Storage |
| AG2-330 | Dumont - Greentown 765 kV | Indiana | Active | American Electric Power | 600.0 | 200.0 | 156.0 | Generation Interconnection | Storage |
| AG2-331 | Jefferson-Greentown 765 kV | Indiana | Active | American Electric Power | 715.0 | 200.0 | 156.0 | Generation Interconnection | Storage |
| AG2-332 | East Elkhart – Elcona Tap 138 kV | Indiana | Active | American Electric Power | 200.0 | 100.0 | 100.0 | Generation Interconnection | Storage |
| AG2-338 | Rogers Road - Carson 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 40.0 | 40.0 | 40.0 | Generation Interconnection | Storage |
| AG2-339 | Rogers Road - Carson 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 100.0 | Generation Interconnection | Storage |
| AG2-341 | Ridge Road 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AG2-343 | Eugene - Dequine 345 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 78.0 | Generation Interconnection | Storage |
| AG2-344 | Dequine 345 bkV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 78.0 | Generation Interconnection | Storage |
| AG2-345 | Eugene - Dequine 345 kV | Indiana | Active | American Electric Power | 150.0 | 50.0 | 39.0 | Generation Interconnection | Storage |
| AG2-347 | Indian River 230 kV II | Delaware | Active | Delmarva Power and Light Company | 448.8 | 448.8 | 121.2 | Generation Interconnection | Offshore Wind |
| AG2-356 | South Troy - Canton 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AG2-360 | Broadford 138 kV | Virginia | Active | American Electric Power | 250.0 | 250.0 | 250.0 | Generation Interconnection | Storage |
| AG2-363 | Powerton 345 kV | Illinois | Active | Commonwealth Edison Company | 300.0 | 300.0 | 180.0 | Generation Interconnection | Solar |
| AG2-364 | Powerton 345 kV | Illinois | Active | Commonwealth Edison Company | 500.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AG2-365 | Conneaut Tap-Werner 69 kV | Pennsylvania | Active | American Transmission Systems, Incorporated | 35.0 | 35.0 | 21.0 | Generation Interconnection | Solar |
| AG2-366 | Garner Delivery Point - Lancaster 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AG2-369 | Heritage - Wake 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 86.0 | 86.0 | 51.6 | Generation Interconnection | Solar |
| AG2-370 | Tillman 138 kV | Indiana | Active | American Electric Power | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AG2-378 | North Hampton – Medway 69 kV | Ohio | Active | American Transmission Systems, Incorporated | 74.0 | 20.0 | 13.5 | Generation Interconnection | Solar |
| AG2-380 | Carville 138 kV IV | Maryland | Active | Delmarva Power and Light Company | 106.0 | 20.0 | 20.0 | Generation Interconnection | Storage |
| AG2-382 | Cashie 230 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 70.0 | 70.0 | 42.0 | Generation Interconnection | Solar |
| AG2-384 | Chesterfield 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 60.0 | 60.0 | 24.0 | Generation Interconnection | Storage |
| AG2-385 | North Hampton 69 kV | Ohio | Active | American Transmission Systems, Incorporated | 128.0 | 54.0 | 36.5 | Generation Interconnection | Solar |
| AG2-400 | Allen 345 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AG2-401 | Losantville 345 kV | Indiana | Active | American Electric Power | 200.0 | 0.0 | 44.0 | Generation Interconnection | Solar |
| AG2-402 | Allen 345 kV | Indiana | Active | American Electric Power | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AG2-403 | Meadow Brook - Mt. Storm 500 kV | West Virginia | Active | The Potomac Edison Company | 125.0 | 125.0 | 52.5 | Generation Interconnection | Solar |
| AG2-404 | Meadow Brook - Mt. Storm 500 kV II | West Virginia | Active | The Potomac Edison Company | 250.0 | 125.0 | 52.5 | Generation Interconnection | Solar |
| AG2-405 | Continental 69 kV | Ohio | Active | American Electric Power | 49.9 | 0.0 | 10.98 | Generation Interconnection | Solar |
| AG2-406 | Payne 69 kV | Ohio | Active | American Electric Power | 49.9 | 0.0 | 10.98 | Generation Interconnection | Solar |
| AG2-408 | Allen 345 kV | Indiana | Active | American Electric Power | 100.0 | 0.0 | 18.0 | Generation Interconnection | Solar |
| AG2-411 | Statler Hill 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 63.0 | 63.0 | 40.7 | Generation Interconnection | Solar |
| AG2-418 | Blain 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 40.0 | 40.0 | 20.0 | Generation Interconnection | Solar; Storage |
| AG2-420 | Eclipse #2 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 25.0 | 25.0 | 14.0 | Generation Interconnection | Solar; Storage |
| AG2-423 | Cherry Run–Harmony 138 kV | West Virginia | Active | Monongahela Power Company | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AG2-424 | Magnolia - Summersville 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 63.25 | 63.25 | 34.95 | Generation Interconnection | Solar; Storage |
| AG2-426 | Wakefield - Waverly 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 50.0 | 50.0 | 47.66 | Generation Interconnection | Solar; Storage |
| AG2-427 | Waverly 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 85.0 | 85.0 | 66.3 | Generation Interconnection | Solar; Storage |
| AG2-428 | Wakefield 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 170.0 | 170.0 | 135.7 | Generation Interconnection | Solar; Storage |
| AG2-429 | Burma - Armstrong 138 kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 69.0 | 69.0 | 53.86 | Generation Interconnection | Solar; Storage |
| AG2-430 | Sunbury-Dalmatia 69 kV II | Pennsylvania | Active | PPL Electric Utilities Corporation | 60.0 | 60.0 | 37.7 | Generation Interconnection | Solar |
| AG2-436 | Carson - Rogers Road 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 400.0 | 400.0 | 400.0 | Generation Interconnection | Solar; Storage |
| AG2-438 | Union City 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 10.0 | 10.0 | 6.7 | Generation Interconnection | Solar |
| AG2-439 | Oxbow 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 9.8 | 9.8 | 5.3 | Generation Interconnection | Solar |
| AG2-440 | Twittys Creek - Madisonville 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AG2-441 | Twittys Creek - Madisonville 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 225.0 | 125.0 | 75.0 | Generation Interconnection | Solar |
| AG2-442 | Twittys Creek - Madisonville 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 140.0 | 140.0 | 84.0 | Generation Interconnection | Solar |
| AG2-444 | Bixby - Biers Run 345 kV | Ohio | Active | American Electric Power | 163.0 | 163.0 | 122.5 | Generation Interconnection | Solar |
| AG2-447 | Cedar Creek 138 kV VII | Delaware | Active | Delmarva Power and Light Company | 134.3 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AG2-448 | Cross School - Westvaco 138 kV | West Virginia | Active | The Potomac Edison Company | 50.0 | 50.0 | 30.0 | Generation Interconnection | Solar |
| AG2-449 | Jefferson-Greentown 765 kV | Indiana | Active | American Electric Power | 835.0 | 120.0 | 15.0 | Generation Interconnection | Solar |
| AG2-450 | Bridgeport 230 kV | New Jersey | Active | Atlantic City Electric | 219.0 | 219.0 | 115.3 | Generation Interconnection | Storage |
| AG2-451 | Chambers 230 kV | New Jersey | Active | Atlantic City Electric | 240.0 | 240.0 | 123.0 | Generation Interconnection | Storage |
| AG2-453 | Lasalle - Plano 345 kV | Illinois | Active | Commonwealth Edison Company | 280.0 | 280.0 | 196.0 | Generation Interconnection | Solar |
| AG2-456 | Pierce Brook-Lewis Run 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 80.0 | 80.0 | 55.8 | Generation Interconnection | Solar |
| AG2-457 | Pierce Brook - Lewis Run 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 160.0 | 80.0 | 55.8 | Generation Interconnection | Solar |
| AG2-458 | Kittatinny-Newton 34.5 kV II | New Jersey | Active | Jersey Central Power & Light Company | 19.8 | 0.0 | 1.89 | Generation Interconnection | Storage |
| AG2-459 | Allenwood-Larrabee 34.5 kV II | New Jersey | Active | Jersey Central Power & Light Company | 7.0 | 0.0 | 0.7 | Generation Interconnection | Storage |
| AG2-460 | East Flemington-Lebanon 34.5 kV II | New Jersey | Active | Jersey Central Power & Light Company | 20.0 | 0.0 | 2.0 | Generation Interconnection | Storage |
| AG2-469 | Westmoreland – Oak Grove 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AG2-476 | Hokes-Grantley 69 kV II | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 0.0 | 0.1 | Generation Interconnection | Solar |
| AG2-477 | Hokes-Jackson 69 kV III | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 0.0 | 0.5 | Generation Interconnection | Solar |
| AG2-478 | Hokes-Jackson 69 kV IV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 0.0 | 0.5 | Generation Interconnection | Solar |
| AG2-479 | Penns Tap-Richfield Tie 69 kV II | Pennsylvania | Active | PPL Electric Utilities Corporation | 20.0 | 0.0 | 4.1 | Generation Interconnection | Solar |
| AG2-481 | Derry Tap-Derry Bus 69 kV III | Pennsylvania | Active | PPL Electric Utilities Corporation | 20.0 | 0.0 | 4.1 | Generation Interconnection | Solar |
| AG2-484 | Mifflintown Bus-Mifflintown Tap 69 kV II | Pennsylvania | Active | PPL Electric Utilities Corporation | 20.0 | 0.0 | 4.1 | Generation Interconnection | Solar |
| AG2-487 | Madison - Tanners Creek 138 kV | Indiana | Active | American Electric Power | 152.5 | 0.0 | 10.6 | Generation Interconnection | Solar |
| AG2-491 | Meadow Lake 345 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AG2-492 | Meadow Lake 345 kV | Indiana | Active | American Electric Power | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AG2-505 | Westvaco - Mt Zion 138 kV | Maryland | Active | The Potomac Edison Company | 14.0 | 14.0 | 14.0 | Generation Interconnection | Hydro |
| AG2-515 | Midway 345 kV III | Ohio | Active | American Transmission Systems, Incorporated | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AG2-516 | Pecatonica 138kV | Illinois | Active | Commonwealth Edison Company | 120.0 | 120.0 | 72.0 | Generation Interconnection | Solar |
| AG2-518 | Tech Drive 138 kV | Virginia | Active | American Electric Power | 80.0 | 80.0 | 32.0 | Generation Interconnection | Storage |
| AG2-519 | Royerton - Desoto 138 kV | Indiana | Active | American Electric Power | 111.0 | 111.0 | 87.8 | Generation Interconnection | Solar; Storage |
| AG2-522 | Five Forks DP 115 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AG2-524 | LaSalle Station - Mazon 138 kV | Illinois | Active | Commonwealth Edison Company | 110.0 | 110.0 | 110.0 | Generation Interconnection | Solar; Storage |
| AG2-532 | Pohatcong-Newburgh Tap 34.5 kV | New Jersey | Active | Jersey Central Power & Light Company | 20.0 | 20.0 | 0.0 | Generation Interconnection | Storage |
| AG2-533 | Newburgh-Pohatcong 34.5 kV | New Jersey | Active | Jersey Central Power & Light Company | 20.0 | 20.0 | 0.0 | Generation Interconnection | Storage |
| AG2-534 | Flanders-Pohatcong Mountain R722 34.5 kV | New Jersey | Active | Jersey Central Power & Light Company | 20.0 | 20.0 | 0.0 | Generation Interconnection | Storage |
| AG2-535 | Hackettstown-Pohatcong J738-1 34.5 kV II | New Jersey | Active | Jersey Central Power & Light Company | 40.0 | 20.0 | 0.0 | Generation Interconnection | Storage |
| AG2-541 | Perth - Crystal Hill 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 65.0 | 65.0 | 39.0 | Generation Interconnection | Solar; Storage |
| AG2-544 | Silver Lake 345 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 80.0 | Generation Interconnection | Storage |
| AG2-545 | Silver Lake 345 kV | Illinois | Active | Commonwealth Edison Company | 600.0 | 400.0 | 160.0 | Generation Interconnection | Storage |
| AG2-548 | Corwin - Elk 138 kV | Ohio | Active | American Electric Power | 90.0 | 90.0 | 54.0 | Generation Interconnection | Solar; Storage |
| AG2-550 | Bluff Point - Randolph 138 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AG2-551 | Bluff Point - Randolph 138 kV | Indiana | Active | American Electric Power | 150.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AG2-553 | Bullitt County 161 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AG2-561 | Glory - Glen Campbell 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AG2-562 | Elderberry 345 kV | Indiana | Active | American Electric Power | 767.0 | 52.0 | 0.0 | Generation Interconnection | Natural Gas |
| AG2-564 | Sulphur Springs 138 kV | Ohio | Active | American Electric Power | 49.99 | 49.99 | 32.9 | Generation Interconnection | Solar |
| AG2-566 | Briery - Finneywood 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 110.0 | 30.0 | 12.0 | Generation Interconnection | Storage |
| AG2-568 | Stink Run – Sundial 138 kV | West Virginia | Active | American Electric Power | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AG2-570 | Heritage - Wake 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 400.0 | 400.0 | 100.0 | Generation Interconnection | Solar |
| AG2-571 | Heritage - Wake 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 500.0 | 100.0 | 40.0 | Generation Interconnection | Storage |
| AG2-575 | Crego Rd. 138 kV | Illinois | Active | Commonwealth Edison Company | 290.0 | 100.0 | 80.0 | Generation Interconnection | Solar; Storage |
| AG2-581 | Rawlings-Clover 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar |
| AG2-582 | Flint Run 500 kV | West Virginia | Active | Monongahela Power Company | 2100.0 | 2100.0 | 2075.0 | Generation Interconnection | Natural Gas |
| AG2-583 | Bremo - Cartersville 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 115.0 | 115.0 | 69.0 | Generation Interconnection | Solar |
| AG2-585 | Kensington 138kV | Illinois | Active | Commonwealth Edison Company | 125.0 | 125.0 | 75.0 | Generation Interconnection | Solar |
| AG2-589 | Ravenswood - Hemlock 69 kV | Ohio | Active | American Electric Power | 20.0 | 20.0 | 2.0 | Generation Interconnection | Solar |
| AG2-615 | Carlos Junction-Garrett 138 kV | Maryland | Active | The Potomac Edison Company | 100.0 | 100.0 | 62.6 | Generation Interconnection | Solar |
| AG2-616 | Churchtown - Upper Pittsgrove 138 kV | New Jersey | Active | Atlantic City Electric | 50.0 | 50.0 | 32.35 | Generation Interconnection | Solar |
| AG2-617 | Waugh Chapel 115 kV | Maryland | Active | Baltimore Gas and Electric Company | 55.0 | 55.0 | 33.0 | Generation Interconnection | Solar |
| AG2-618 | Morgantown 230 kV | Maryland | Active | Potomac Electric Power Company | 110.0 | 110.0 | 71.5 | Generation Interconnection | Solar |
| AG2-621 | Hoytdale 138 kV | Pennsylvania | Active | American Transmission Systems, Incorporated | 150.0 | 150.0 | 150.0 | Generation Interconnection | Storage |
| AG2-625 | Pequest River-Furnace Brook Tap 34.5 kV II | New Jersey | Active | Jersey Central Power & Light Company | 19.6 | 19.6 | 8.232 | Generation Interconnection | Solar |
| AG2-626 | Pequest River-Furnace Brook Tap 34.5 kV III | New Jersey | Active | Jersey Central Power & Light Company | 12.5 | 12.5 | 5.25 | Generation Interconnection | Solar |
| AG2-627 | Woodstown-High Street 69 kV | New Jersey | Active | Atlantic City Electric | 40.0 | 40.0 | 24.0 | Generation Interconnection | Solar |
| AG2-637 | Randolph - Hodgin 138 kV | Indiana | Active | American Electric Power | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar |
| AG2-646 | Chesterfield 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 200.0 | 200.0 | 200.0 | Generation Interconnection | Storage |
| AG2-654 | Craigsville - Leards Crossing 12 kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 14.7 | 14.7 | 8.8 | Generation Interconnection | Solar |
| AG2-657 | Kanawha River - Carbondale 138 kV | West Virginia | Active | American Electric Power | 90.0 | 90.0 | 37.8 | Generation Interconnection | Solar |
| AG2-658 | Cowen 138 kV | West Virginia | Active | Monongahela Power Company | 210.0 | 210.0 | 135.3 | Generation Interconnection | Solar |
| AG2-659 | Kerr Dam – Hawtree 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AG2-660 | Nelson-Electric Junction 345 kV | Illinois | Active | Commonwealth Edison Company | 600.0 | 0.0 | 20.0 | Generation Interconnection | Storage |
| AG2-661 | Hopewell - Colonial Trail 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 150.0 | 0.0 | 20.0 | Generation Interconnection | Storage |
| AG2-665 | Corwin - Elk 138 kV | Ohio | Active | American Electric Power | 180.0 | 90.0 | 54.0 | Generation Interconnection | Solar; Storage |
| AG2-670 | Green County -Taylor County Junction 161 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 75.0 | 75.0 | 45.0 | Generation Interconnection | Solar |
| AG2-675 | Cordova 345 kV | Illinois | Active | Commonwealth Edison Company | 335.0 | 80.0 | 32.0 | Generation Interconnection | Storage |
| AH1-004 | Avon - Renaker 138 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 40.0 | 40.0 | 24.0 | Generation Interconnection | Solar |
| AH1-005 | East Towanda-South Troy 115 kV II | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 51.0 | 20.0 | 14.0 | Generation Interconnection | Solar |
| AH1-012 | Louisa - North Anna 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 50.0 | 50.0 | 20.0 | Generation Interconnection | Storage |
| AH1-027 | Cartanza 230 kV | Delaware | Active | Delmarva Power and Light Company | 25.0 | 25.0 | 15.0 | Generation Interconnection | Solar |
| AH1-033 | Sligo 34.5 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 19.5 | 19.5 | 13.0 | Generation Interconnection | Solar |
| AH1-034 | Patton Road Junction - Summer Shade 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 100.0 | 100.0 | 70.0 | Generation Interconnection | Solar |
| AH1-035 | Plymouth 34.5 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 13.5 | Generation Interconnection | Solar |
| AH1-040 | Mackeys - Creswell 115 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar |
| AH1-042 | Providence Forge-Turner 115kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 154.0 | 154.0 | 99.9 | Generation Interconnection | Solar |
| AH1-044 | Nelson - Electric Junction 345 kV | Illinois | Active | Commonwealth Edison Company | 800.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AH1-047 | Marengo - Belvidere 138 kV | Illinois | Active | Commonwealth Edison Company | 58.6 | 58.6 | 37.0 | Generation Interconnection | Solar |
| AH1-050 | Eclipse-Piney 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 50.0 | 50.0 | 30.0 | Generation Interconnection | Solar |
| AH1-051 | Eclipse-Piney 115 kV II | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 80.0 | 30.0 | 18.0 | Generation Interconnection | Solar |
| AH1-054 | Upton-Whitings 34.5 kV | New Jersey | Active | Jersey Central Power & Light Company | 8.25 | 8.25 | 3.465 | Generation Interconnection | Solar |
| AH1-055 | Kyger Creek - Don Marquis 345 kV | Ohio | Active | Ohio Valley Electric Corporation | 220.0 | 220.0 | 154.0 | Generation Interconnection | Solar |
| AH1-056 | Red House DP 115kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 68.5 | Generation Interconnection | Solar |
| AH1-057 | Edgewood 12.47 kV | Maryland | Active | Delmarva Power and Light Company | 7.2 | 7.2 | 3.0 | Generation Interconnection | Solar |
| AH1-059 | Sharp Road 69 kV | Ohio | Active | American Electric Power | 120.0 | 40.0 | 24.0 | Generation Interconnection | Solar |
| AH1-060 | Cardington-Liberty 69 kV III | Ohio | Active | American Transmission Systems, Incorporated | 94.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-065 | Hopewell 34.5kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 8.0 | Generation Interconnection | Storage |
| AH1-066 | Hopewell 34.5kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 10.0 | 10.0 | 4.0 | Generation Interconnection | Storage |
| AH1-069 | Jerome – Mohicanville 69 kV | Ohio | Active | American Transmission Systems, Incorporated | 17.0 | 17.0 | 10.2 | Generation Interconnection | Solar |
| AH1-070 | Jerome – Mohicanville 69 kV | Ohio | Active | American Transmission Systems, Incorporated | 34.0 | 17.0 | 10.2 | Generation Interconnection | Solar |
| AH1-071 | Midlothian 34.5 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-072 | Red Onion - VC5 69 kV | Virginia | Active | American Electric Power | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-073 | Red Onion - VC5 69 kV | Virginia | Active | American Electric Power | 40.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-075 | North Waldo - Wild Creek 138 kV | Ohio | Active | American Electric Power | 68.0 | 8.0 | 24.7 | Generation Interconnection | Solar |
| AH1-086 | Morrisville 230kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 90.0 | 90.0 | 90.0 | Generation Interconnection | Storage |
| AH1-087 | Morrisville 230kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 110.0 | 20.0 | 20.0 | Generation Interconnection | Storage |
| AH1-088 | Morrisville 230kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 130.0 | 20.0 | 20.0 | Generation Interconnection | Storage |
| AH1-089 | Morrisville 230kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 150.0 | 20.0 | 20.0 | Generation Interconnection | Storage |
| AH1-091 | Ahoskie 34.5kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 17.0 | 0.0 | 0.0 | Generation Interconnection | Storage |
| AH1-098 | Wolf Glade-West Carroll 138 kV | Virginia | Active | American Electric Power | 40.0 | 40.0 | 24.0 | Generation Interconnection | Solar; Storage |
| AH1-102 | Seward-Glory 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 100.0 | 100.0 | 63.4 | Generation Interconnection | Solar |
| AH1-106 | Winterpock 34.5kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 26.0 | 26.0 | 15.6 | Generation Interconnection | Solar |
| AH1-107 | Winterpock 34.5kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 26.0 | 26.0 | 15.6 | Generation Interconnection | Solar |
| AH1-108 | Spruance NUG 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 66.0 | 0.0 | 9.0 | Generation Interconnection | Natural Gas |
| AH1-124 | Vint Hill 34.5kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 0.0 | Generation Interconnection | Storage |
| AH1-125 | Brambleton 34.5kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 0.0 | Generation Interconnection | Storage |
| AH1-127 | Railroad 34.5kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 0.0 | Generation Interconnection | Storage |
| AH1-128 | Railroad 34.5kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 0.0 | Generation Interconnection | Storage |
| AH1-133 | Saltville - Tazewell 138 kV | Virginia | Active | American Electric Power | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AH1-136 | Falcon - Middle Creek 46 kV | Kentucky | Active | American Electric Power | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-138 | Penniman 34.5 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 8.4 | Generation Interconnection | Solar |
| AH1-140 | Vasco 138 kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 150.0 | 150.0 | 115.0 | Generation Interconnection | Solar; Storage |
| AH1-144 | Peter's Mountain 138 kV | Virginia | Active | American Electric Power | 120.0 | 120.0 | 50.4 | Generation Interconnection | Solar |
| AH1-145 | Peter's Mountain 138 kV | Virginia | Active | American Electric Power | 200.0 | 80.0 | 80.0 | Generation Interconnection | Storage |
| AH1-146 | White Rock - Wayne 345 kV | Illinois | Active | Commonwealth Edison Company | 200.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AH1-147 | White Rock - Wayne 345 kV | Illinois | Active | Commonwealth Edison Company | 400.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AH1-150 | Nelson-Electric Junction 345 kV | Illinois | Active | Commonwealth Edison Company | 1000.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AH1-151 | Nelson-Electric Junction 345 kV | Illinois | Active | Commonwealth Edison Company | 1200.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AH1-153 | Dumont 345 kV | Indiana | Active | American Electric Power | 300.0 | 150.0 | 90.0 | Generation Interconnection | Solar |
| AH1-157 | Penniman - Waller 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 100.0 | Generation Interconnection | Storage |
| AH1-158 | Eclipse-Piney 115 kV III | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 80.0 | 0.0 | 30.0 | Generation Interconnection | Storage |
| AH1-164 | Oak Level - Tank Hill 138 kV | Virginia | Active | American Electric Power | 35.0 | 35.0 | 21.0 | Generation Interconnection | Solar |
| AH1-165 | Will County 138 kV | Illinois | Active | Commonwealth Edison Company | 72.0 | 72.0 | 0.0 | Generation Interconnection | Storage |
| AH1-170 | Columbia DP 115kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-188 | Pigeon Creek 138 kV | West Virginia | Active | American Electric Power | 140.0 | 140.0 | 84.0 | Generation Interconnection | Solar |
| AH1-196 | Prairie 345 kV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar |
| AH1-201 | Allegheny-New Baltimore 115kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 40.0 | 40.0 | 24.0 | Generation Interconnection | Solar |
| AH1-203 | Allegheny-Somerset 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 70.0 | 70.0 | 42.0 | Generation Interconnection | Solar |
| AH1-205 | Allegheny-New Baltimore 115kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 40.0 | 0.0 | 16.0 | Generation Interconnection | Storage |
| AH1-206 | Bethelboro 138 kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 60.0 | 60.0 | 60.0 | Generation Interconnection | Storage |
| AH1-212 | Bethlehem - Lilly 46 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-215 | Central VA-Twitty 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 31.5 | 31.5 | 18.9 | Generation Interconnection | Solar; Storage |
| AH1-216 | Smithfield-Surry 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 99.0 | 99.0 | 79.2 | Generation Interconnection | Solar; Storage |
| AH1-217 | Kidds Store - Fork Union 115 kV II | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 57.0 | 57.0 | 34.2 | Generation Interconnection | Solar |
| AH1-220 | Remington CT 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 0.0 | 60.0 | Generation Interconnection | Storage |
| AH1-221 | Heritage 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 75.0 | 0.0 | 45.0 | Generation Interconnection | Storage |
| AH1-223 | Poland Rd-Runway DP 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 150.0 | 0.0 | 20.0 | Generation Interconnection | Storage |
| AH1-227 | Flemming - Fremont 69 kV | Virginia | Active | American Electric Power | 51.3 | 51.3 | 30.78 | Generation Interconnection | Solar |
| AH1-234 | Wempletown - Paddock 345 kV | Illinois | Active | Commonwealth Edison Company | 224.0 | 224.0 | 29.12 | Generation Interconnection | Solar |
| AH1-239 | Upchurch - Zula 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AH1-241 | Cobbs Creek - James River Industrial 115kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AH1-247 | Lardin - Lake Lynn 138kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 40.0 | 40.0 | 24.0 | Generation Interconnection | Solar |
| AH1-248 | Lardin - Lake Lynn 138kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 65.0 | 25.0 | 15.0 | Generation Interconnection | Solar |
| AH1-249 | Lardin – Lake Lynn 138kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 145.0 | 80.0 | 80.0 | Generation Interconnection | Storage |
| AH1-251 | Todds Tavern- Spotsylvania/Goldsdale 115kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 50.0 | 50.0 | 50.0 | Generation Interconnection | Storage |
| AH1-254 | Greenland Gap 500 kV II | West Virginia | Active | Monongahela Power Company | 171.4 | 171.4 | 36.538 | Generation Interconnection | Wind |
| AH1-257 | Broadway - Washington 34.5 kV | New Jersey | Active | Jersey Central Power & Light Company | 19.25 | 19.25 | 8.085 | Generation Interconnection | Solar |
| AH1-258 | Belford - Keansburg 34.5 kV | New Jersey | Active | Jersey Central Power & Light Company | 19.25 | 19.25 | 8.085 | Generation Interconnection | Solar |
| AH1-260 | New Freedom - Monroe 230 kV | New Jersey | Active | Atlantic City Electric | 300.0 | 300.0 | 300.0 | Generation Interconnection | Storage |
| AH1-261 | Northeast - Riverside 230 kV | Maryland | Active | Baltimore Gas and Electric Company | 135.0 | 135.0 | 135.0 | Generation Interconnection | Storage |
| AH1-263 | Chancellor 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 200.0 | 200.0 | 200.0 | Generation Interconnection | Storage |
| AH1-265 | Winslow - Monroe 69kV | New Jersey | Active | Atlantic City Electric | 29.4 | 29.4 | 12.35 | Generation Interconnection | Solar |
| AH1-268 | Seward-Glory 115 kV II | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 100.0 | 0.0 | 36.6 | Generation Interconnection | Storage |
| AH1-269 | Claytor 138 kV | Virginia | Active | American Electric Power | 50.0 | 50.0 | 50.0 | Generation Interconnection | Storage |
| AH1-271 | Cashie 230 kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 110.0 | 40.0 | 24.0 | Generation Interconnection | Solar |
| AH1-272 | Argenta - Twin Branch 345 kV | Michigan | Active | American Electric Power | 185.0 | 185.0 | 123.9 | Generation Interconnection | Solar |
| AH1-274 | Butler 69 kV | New Jersey | Active | Atlantic City Electric | 16.7 | 16.7 | 7.0 | Generation Interconnection | Solar |
| AH1-280 | Jetersville-Ponton 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 106.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-281 | Bluegrass Parkway Tap - Woodlawn 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-282 | Galion - Ohio Central 345 kV | Ohio | Active | American Electric Power | 150.0 | 150.0 | 90.0 | Generation Interconnection | Solar |
| AH1-283 | Mount Storm-Pruntytown 500kV | Maryland | Active | The Potomac Edison Company | 200.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AH1-285 | Sandwich 138 kV | Illinois | Active | Commonwealth Edison Company | 86.0 | 86.0 | 11.18 | Generation Interconnection | Solar |
| AH1-292 | Sullivan 345 kV | Indiana | Active | American Electric Power | 200.0 | 0.0 | 44.0 | Generation Interconnection | Solar |
| AH1-298 | Meridian 345 kV | Indiana | Active | American Electric Power | 75.0 | 75.0 | 75.0 | Generation Interconnection | Storage |
| AH1-302 | Olive - Reynolds 345 kV | Indiana | Active | American Electric Power | 275.0 | 75.0 | 75.0 | Generation Interconnection | Storage |
| AH1-304 | Delaware-Van Buren 138 kV | Indiana | Active | American Electric Power | 163.0 | 0.0 | 9.8 | Generation Interconnection | Solar |
| AH1-305 | Olive - Reynolds 345 kV | Indiana | Active | American Electric Power | 275.0 | 0.0 | 35.72 | Generation Interconnection | Solar |
| AH1-306 | Mississinewa-Gaston 138 kV | Indiana | Active | American Electric Power | 200.0 | 0.0 | 28.8 | Generation Interconnection | Solar |
| AH1-308 | Pennville - Adams 138 kV | Indiana | Active | American Electric Power | 205.0 | 50.0 | 50.0 | Generation Interconnection | Storage |
| AH1-309 | Kenzie Creek-Colby 138 kV | Michigan | Active | American Electric Power | 150.0 | 0.0 | 27.0 | Generation Interconnection | Solar |
| AH1-311 | Heartsease DP - Mayo Dunbar 115kV | North Carolina | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 75.0 | 0.0 | 2.25 | Generation Interconnection | Solar |
| AH1-313 | Moshannon-Milesburg 230 kV VII | Pennsylvania | Active | Keystone Appalachian Transmission Company | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar; Storage |
| AH1-314 | East Danville 138 kV | Virginia | Active | American Electric Power | 100.0 | 100.0 | 100.0 | Generation Interconnection | Storage |
| AH1-323 | Elmont 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 100.0 | Generation Interconnection | Storage |
| AH1-324 | Colonial Trail – Surry 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AH1-327 | Hardin Switch 345 kV | Ohio | Active | American Electric Power | 250.0 | 0.0 | 8.44 | Generation Interconnection | Solar |
| AH1-328 | Blue Jacket - Kirby 138 kV | Ohio | Active | The Dayton Power and Light Company | 206.55 | 0.0 | 21.3 | Generation Interconnection | Solar |
| AH1-334 | Lakehurst - Whitings 34.5 kV | New Jersey | Active | Jersey Central Power & Light Company | 19.25 | 19.25 | 8.085 | Generation Interconnection | Solar |
| AH1-337 | Randolph - Hodgin 138 kV | Indiana | Active | American Electric Power | 46.0 | 46.0 | 39.0 | Generation Interconnection | Solar |
| AH1-338 | McGirr Rd - Ritchie Road 138kV | Illinois | Active | Commonwealth Edison Company | 180.0 | 180.0 | 23.4 | Generation Interconnection | Solar |
| AH1-339 | West Crawford 69 kV | Ohio | Active | American Electric Power | 80.0 | 80.0 | 6.76 | Generation Interconnection | Solar |
| AH1-340 | Cheat Lake-Ruthbelle 138 kV | West Virginia | Active | Monongahela Power Company | 48.89 | 48.89 | 29.33 | Generation Interconnection | Solar |
| AH1-341 | Stillman - Dixon 138KV | Illinois | Active | Commonwealth Edison Company | 150.0 | 150.0 | 96.6 | Generation Interconnection | Solar |
| AH1-343 | Crystal Hill DP- Perth 115kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 69.0 | 69.0 | 41.4 | Generation Interconnection | Solar |
| AH1-345 | Remington 324 34.5 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 14.0 | 14.0 | 8.4 | Generation Interconnection | Solar |
| AH1-348 | Pound 34.5 kV | Virginia | Active | American Electric Power | 10.0 | 10.0 | 6.0 | Generation Interconnection | Solar |
| AH1-357 | Pierce Brook-Lewis Run 230kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 180.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-358 | Pierce Brook-Lewis Run 230kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 200.0 | 20.0 | 20.0 | Generation Interconnection | Storage |
| AH1-359 | Pierce Brook - Lewis Run 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 220.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-360 | Pierce Brook - Lewis Run 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 240.0 | 20.0 | 20.0 | Generation Interconnection | Storage |
| AH1-367A | Franklin 138 kV II | Pennsylvania | Active | Keystone Appalachian Transmission Company | 72.0 | 72.0 | 43.2 | Generation Interconnection | Solar |
| AH1-377 | Clover- Farmville 230kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 186.0 | 186.0 | 111.6 | Generation Interconnection | Solar |
| AH1-380 | Mt Olive - Kenny 69kV | Maryland | Active | Delmarva Power and Light Company | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-387 | Meadowbrook-Greenland Gap 500kV | West Virginia | Active | The Potomac Edison Company | 150.0 | 150.0 | 22.05 | Generation Interconnection | Wind |
| AH1-391 | Olive 138 kV | Indiana | Active | American Electric Power | 100.0 | 100.0 | 67.0 | Generation Interconnection | Solar |
| AH1-392 | Gravel Pit-Kankakee 138 kV | Indiana | Active | American Electric Power | 90.0 | 90.0 | 60.0 | Generation Interconnection | Solar |
| AH1-396 | Gary 24.94 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 12.0 | 12.0 | 1.8 | Generation Interconnection | Solar |
| AH1-397 | Shacklesford 34.5 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 19.818 | 19.818 | 2.97 | Generation Interconnection | Solar |
| AH1-399 | North Doswell 12.5 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 9.87 | 9.87 | 1.48 | Generation Interconnection | Solar |
| AH1-408 | Freeman DP – Lawrenceville 115 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 120.0 | 120.0 | 75.0 | Generation Interconnection | Solar |
| AH1-426 | Gilboa-Jones Branch 138 kV IV | West Virginia | Active | Monongahela Power Company | 64.6 | 64.6 | 64.6 | Generation Interconnection | Storage |
| AH1-426A | Gilboa-Jones Branch 138 kV V | West Virginia | Active | Monongahela Power Company | 96.9 | 32.3 | 32.3 | Generation Interconnection | Storage |
| AH1-427 | Tommy Gooch - Garrard County 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 100.0 | 100.0 | 60.0 | Generation Interconnection | Solar |
| AH1-439 | Buckingham- Farmville 230kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 85.0 | 85.0 | 51.0 | Generation Interconnection | Solar |
| AH1-452 | Clementine-Clementine Jct. 25 kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 19.9 | 19.9 | 8.35 | Generation Interconnection | Solar |
| AH1-460 | Hooversville - Scalp Level 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 66.0 | 66.0 | 39.6 | Generation Interconnection | Solar |
| AH1-461 | Buckhorn 138 kV | Virginia | Active | American Electric Power | 80.0 | 80.0 | 80.0 | Generation Interconnection | Storage |
| AH1-482 | Olive - Reynolds #2 345 kV | Indiana | Active | American Electric Power | 338.0 | 78.0 | 78.0 | Generation Interconnection | Storage |
| AH1-487 | Camp Reynolds 12.5 kV | Pennsylvania | Active | American Transmission Systems, Incorporated | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-490 | Venango Junction 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-491 | Union City 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 20.0 | 20.0 | 12.0 | Generation Interconnection | Solar |
| AH1-528 | Rawlings - Unity 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 300.8 | 300.8 | 180.0 | Generation Interconnection | Solar |
| AH1-535 | Nagel - Cane River 230 kV | Tennessee | Active | American Electric Power | 100.0 | 100.0 | 40.0 | Generation Interconnection | Solar; Storage |
| AH1-536 | Church-Oil City 138kV | Maryland | Active | Delmarva Power and Light Company | 41.8 | 41.8 | 8.5 | Generation Interconnection | Solar; Storage |
| AH1-537 | Pierce - Kyger Creek 345 kV | Ohio | Active | Ohio Valley Electric Corporation | 178.5 | 178.5 | 17.85 | Generation Interconnection | Solar |
| AH1-539 | South Kenton 138 kV | Ohio | Active | American Electric Power | 129.4 | 129.4 | 25.88 | Generation Interconnection | Solar; Storage |
| AH1-541 | Chestnut 345 kV | Illinois | Active | Commonwealth Edison Company | 92.4 | 92.4 | 27.72 | Generation Interconnection | Solar; Storage |
| AH1-542 | Crissinger-Kirby 138kV | Ohio | Active | American Transmission Systems, Incorporated | 110.0 | 110.0 | 22.0 | Generation Interconnection | Solar; Storage |
| AH1-543 | Mulberry – Tazewell 345 kV | Illinois | Active | Commonwealth Edison Company | 157.4 | 157.4 | 31.48 | Generation Interconnection | Solar; Storage |
| AH1-545 | Wylie Ridge-Tidd 345kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 200.0 | 200.0 | 20.0 | Generation Interconnection | Solar |
| AH1-546 | Bremo - Buckingham 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 79.8 | 79.8 | 47.8 | Generation Interconnection | Solar |
| AH1-552 | Chalk Point 230 kV | Maryland | Active | Potomac Electric Power Company | 670.2 | 670.2 | 670.2 | Generation Interconnection | Solar; Storage |
| AH1-563 | Aurora E.C. 138kV | Illinois | Active | Commonwealth Edison Company | 1206.0 | 150.0 | 150.0 | Generation Interconnection | Storage |
| AH1-564 | Rockford II 138 kV | Illinois | Active | Commonwealth Edison Company | 330.0 | 150.0 | 150.0 | Generation Interconnection | Storage |
| AH1-567 | University Park 138 kV | Illinois | Active | Commonwealth Edison Company | 328.0 | 5.0 | 5.0 | Generation Interconnection | Natural Gas |
| AH1-570 | Headquarters - Millersburg Junction 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 25.0 | 25.0 | 15.6 | Generation Interconnection | Solar |
| AH1-571 | Headquarters - Millersburg Junction 69 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 45.0 | 20.0 | 12.5 | Generation Interconnection | Solar |
| AH1-577 | Clutch 69 kV | Ohio | Active | American Electric Power | 70.0 | 70.0 | 42.0 | Generation Interconnection | Solar |
| AH1-578 | Clutch 69 kV | Ohio | Active | American Electric Power | 98.0 | 28.0 | 28.0 | Generation Interconnection | Storage |
| AH1-580 | Nottingham 138 kV | Ohio | Active | American Electric Power | 400.0 | 200.0 | 134.0 | Generation Interconnection | Solar |
| AH1-584 | Nelson-Indian River 138kV | Delaware | Active | Delmarva Power and Light Company | 50.0 | 50.0 | 30.0 | Generation Interconnection | Solar |
| AH1-585 | Nelson-Indian River 138kV | Delaware | Active | Delmarva Power and Light Company | 100.0 | 50.0 | 30.0 | Generation Interconnection | Solar |
| AH1-586 | Nelson-Indian River 138kV | Delaware | Active | Delmarva Power and Light Company | 145.0 | 45.0 | 45.0 | Generation Interconnection | Storage |
| AH1-587 | Farmers Valley – Ridgeway 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 200.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AH1-588 | Lewis Run - Pierce Brook 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 240.0 | 240.0 | 144.0 | Generation Interconnection | Solar |
| AH1-589 | Lewis Run - Pierce Brook 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 410.0 | 170.0 | 170.0 | Generation Interconnection | Storage |
| AH1-617 | Harbert Metering 138 kV | Kentucky | Active | American Electric Power | 200.0 | 200.0 | 120.0 | Generation Interconnection | Solar |
| AH1-634 | Indian River 230kV I | Delaware | Active | Delmarva Power and Light Company | 323.1 | 68.0 | 17.7 | Generation Interconnection | Offshore Wind |
| AH1-637 | Oak Grove 34.5 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 16.0 | 16.0 | 9.6 | Generation Interconnection | Solar |
| AH1-641 | Churchtown - Upper Pittsgrove 138kV | New Jersey | Active | Atlantic City Electric | 65.0 | 15.0 | 15.0 | Generation Interconnection | Solar |
| AH1-644 | Spicewood Metering 138 kV | Kentucky | Active | American Electric Power | 100.0 | 100.0 | 65.0 | Generation Interconnection | Solar |
| AH1-661 | Cannelville 12.47 kV | Ohio | Active | American Electric Power | 10.07 | 10.07 | 9.06 | Generation Interconnection | Biomass |
| AH1-664 | Goddard-Plumville 138 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 100.0 | 100.0 | 66.8 | Generation Interconnection | Solar |
| AH1-665 | Goddard-Plumsville 138 kV II | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 180.0 | 80.0 | 53.5 | Generation Interconnection | Solar |
| AH1-666 | Flemingsburg - Spurlock 138 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 80.0 | 80.0 | 48.0 | Generation Interconnection | Solar |
| AH1-667 | Philipsburg-Shawville 34.5 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 18.0 | 18.0 | 10.8 | Generation Interconnection | Solar |
| AH1-669 | Circleville-Biers Run 138 kV | Ohio | Active | American Electric Power | 50.0 | 50.0 | 30.0 | Generation Interconnection | Solar |
| AH1-670 | Blue Mound-Chestnut 345 kV | Illinois | Active | Commonwealth Edison Company | 250.0 | 250.0 | 49.6 | Generation Interconnection | Wind |
| AH1-672 | Farmview 138 kV | Delaware | Active | Delmarva Power and Light Company | 75.0 | 75.0 | 48.9 | Generation Interconnection | Solar |
| AH1-673 | State Line - River Energy Center 138 kV | Illinois | Active | Commonwealth Edison Company | 85.0 | 85.0 | 85.0 | Generation Interconnection | Storage |
| AH1-676 | Gordonsville 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 1294.6 | 1294.6 | 1275.9 | Generation Interconnection | Natural Gas |
| AH1-677 | Rogers Road 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 1756.0 | 0.0 | 67.0 | Generation Interconnection | Natural Gas |
| AH1-678 | Heritage 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 1525.5 | 0.0 | 34.0 | Generation Interconnection | Natural Gas |
| AH1-679 | Four Rivers 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 766.0 | 20.0 | 20.0 | Generation Interconnection | Natural Gas |
| AH1-680 | Sammis - South Canton 345 kV | Ohio | Active | American Transmission Systems, Incorporated | 1300.0 | 1300.0 | 1300.0 | Generation Interconnection | Natural Gas |
| AH1-681 | Cunningham 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 1000.0 | 0.0 | 27.3 | Generation Interconnection | Natural Gas |
| AH1-682 | Ladysmith CT 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 190.0 | 0.0 | 21.0 | Generation Interconnection | Natural Gas |
| AH1-683 | Ladysmith CT 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 190.0 | 0.0 | 25.0 | Generation Interconnection | Natural Gas |
| AH1-684 | Remington CT 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 190.0 | 0.0 | 23.0 | Generation Interconnection | Natural Gas |
| AH1-685 | Remington CT 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 190.0 | 0.0 | 26.0 | Generation Interconnection | Natural Gas |
| AH1-686 | Hanging Rock 765 kV | Ohio | Active | American Electric Power | 1364.0 | 24.0 | 21.0 | Generation Interconnection | Natural Gas |
| AH1-687 | Bear Garden 230kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 682.0 | 0.0 | 51.0 | Generation Interconnection | Natural Gas |
| AH1-690 | Bay Shore - Lallendorf 345 kV | Ohio | Active | American Transmission Systems, Incorporated | 1475.0 | 1475.0 | 1440.0 | Generation Interconnection | Natural Gas |
| AH1-691 | Ladysmith CT 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 209.0 | 0.0 | 26.0 | Generation Interconnection | Natural Gas |
| AH1-692 | Ladysmith CT 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 209.0 | 0.0 | 26.0 | Generation Interconnection | Natural Gas |
| AH1-693 | Remington CT 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 190.0 | 0.0 | 20.0 | Generation Interconnection | Natural Gas |
| AH1-694 | Ladysmith CT 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 190.0 | 0.0 | 18.0 | Generation Interconnection | Natural Gas |
| AH1-695 | Three Mile Island 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 859.0 | 859.0 | 803.0 | Generation Interconnection | Nuclear |
| AH1-696 | Possum Point 230kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 668.0 | 0.0 | 94.0 | Generation Interconnection | Natural Gas |
| AH1-698 | Braidwood 345 kV | Illinois | Active | Commonwealth Edison Company | 2584.0 | 130.0 | 57.6 | Generation Interconnection | Nuclear |
| AH1-699 | Wellsville 345 kV | Ohio | Active | American Transmission Systems, Incorporated | 1210.0 | 58.0 | 69.0 | Generation Interconnection | Natural Gas |
| AH1-701 | Valero 69 kV | New Jersey | Active | Atlantic City Electric | 61.0 | 0.0 | 20.0 | Generation Interconnection | Natural Gas |
| AH1-702 | Byron 345 kV | Illinois | Active | Commonwealth Edison Company | 2530.0 | 88.0 | 43.0 | Generation Interconnection | Nuclear |
| AH1-703 | Bergen 230kV | New Jersey | Active | Public Service Electric and Gas Company | 670.61 | 35.61 | 51.254 | Generation Interconnection | Natural Gas |
| AH1-704 | Hannibal 138 kV | Ohio | Active | American Electric Power | 509.0 | 24.0 | 20.0 | Generation Interconnection | Natural Gas |
| AH1-705 | Sunbury #1 500kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 1153.4 | 32.4 | 32.4 | Generation Interconnection | Natural Gas |
| AH1-706 | Lordstown 345 kV | Ohio | Active | American Transmission Systems, Incorporated | 970.453 | 30.453 | 23.823 | Generation Interconnection | Natural Gas |
| AH1-707 | Saegers 230 kV | Pennsylvania | Active | PPL Electric Utilities Corporation | 907.0 | 0.0 | 30.0 | Generation Interconnection | Natural Gas |
| AH1-710 | Salem 500kV | New Jersey | Active | Public Service Electric and Gas Company | 2650.8 | 256.8 | 228.2 | Generation Interconnection | Nuclear |
| AH1-711 | Lemoyne 345 kV | Ohio | Active | American Transmission Systems, Incorporated | 1108.2 | 408.2 | 292.5 | Generation Interconnection | Natural Gas |
| AH1-712 | Cunningham 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 776.0 | 776.0 | 611.0 | Generation Interconnection | Natural Gas |
| AH1-713 | Mt. Storm 500kV | West Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 538.0 | 0.0 | 14.0 | Generation Interconnection | Coal |
| AH1-714 | Lasalle 345 kV | Illinois | Active | Commonwealth Edison Company | 1360.0 | 169.0 | 174.1 | Generation Interconnection | Nuclear |
| AH1-715 | Linden 230kV | New Jersey | Active | Public Service Electric and Gas Company | 803.17 | 127.17 | 149.369 | Generation Interconnection | Natural Gas |
| AH1-716 | Surry-Skiffes Creek 500kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 650.0 | 650.0 | 650.0 | Generation Interconnection | Storage |
| AH1-717 | Surry 230kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 453.0 | 85.0 | 92.7 | Generation Interconnection | Natural Gas |
| AH1-718 | Nelson 345 kV | Illinois | Active | Commonwealth Edison Company | 391.0 | 11.0 | 38.0 | Generation Interconnection | Natural Gas |
| AH1-719 | Beverly 345 kV | Ohio | Active | American Electric Power | 694.0 | 24.0 | 21.0 | Generation Interconnection | Natural Gas |
| AH1-720 | East Towanda 230 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 907.5 | 0.0 | 60.0 | Generation Interconnection | Natural Gas |
| AH1-721 | Laurel-Cooper 161 kV | Kentucky | Active | East Kentucky Power Cooperative, Inc. | 786.0 | 786.0 | 758.9507 | Generation Interconnection | Natural Gas |
| AH1-722 | Linden 230kV | New Jersey | Active | Public Service Electric and Gas Company | 806.4 | 130.4 | 158.1 | Generation Interconnection | Natural Gas |
| AH1-723 | Cunningham 500 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 776.0 | 776.0 | 712.0 | Generation Interconnection | Natural Gas |
| AH1-725 | Conastone 500 kV | Maryland | Active | Baltimore Gas and Electric Company | 500.0 | 500.0 | 500.0 | Generation Interconnection | Storage |
| AH1-727 | Brambleton-Goose Creek 500kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 425.0 | 425.0 | 425.0 | Generation Interconnection | Storage |
| AH1-729 | Ocean Court 230 kV | Virginia | Active | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) | 100.0 | 100.0 | 100.0 | Generation Interconnection | Storage |
| AH1-734 | South Bend 500 kV | Pennsylvania | Active | Keystone Appalachian Transmission Company | 1058.4 | 270.3 | 268.6 | Generation Interconnection | Natural Gas |
| AH1-735 | Richland 138 kV | Ohio | Active | American Transmission Systems, Incorporated | 447.0 | 19.0 | 55.0 | Generation Interconnection | Natural Gas |
| AH1-744 | Cheltenham 500 kV | Maryland | Active | Potomac Electric Power Company | 853.5 | 53.5 | 48.285 | Generation Interconnection | Natural Gas |
| AH1-746 | Madera - Westover South 115 kV | Pennsylvania | Active | Mid-Atlantic Interstate Transmission, LLC | 109.9 | 0.0 | 20.0 | Generation Interconnection | Wind |
Stability Clusters
Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.
CIR Claims From Deactivated Generators
The following Transition Cycle 2 Phase I projects intend to claim and transfer CIRs from deactivated capacity generation resources. PJM performed a reliability analysis of the impacts to the system capability for the proposed transfers of CIRs from the deactivated generation resources.
| Project | Status | Deactivated Generators | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| AG2-366 | Active |
| ||||||||||||
| AG2-369 | Active |
| ||||||||||||
| AG2-440 | Active |
| ||||||||||||
| AG2-069 | Active |
| ||||||||||||
| AH1-220 | Active |
| ||||||||||||
| AG2-441 | Active |
| ||||||||||||
| AH1-552 | Active |
| ||||||||||||
| AG2-384 | Active |
| ||||||||||||
| AG2-093 | Active |
| ||||||||||||
| AH1-138 | Active |
| ||||||||||||
| AG2-618 | Active |
| ||||||||||||
| AG2-152 | Active |
| ||||||||||||
| AH1-227 | Active |
| ||||||||||||
| AG2-450 | Active |
| ||||||||||||
| AH1-221 | Active |
| ||||||||||||
| AH1-071 | Active |
| ||||||||||||
| AG2-193 | Active |
| ||||||||||||
| AG2-095 | Active |
| ||||||||||||
| AG2-068 | Active |
| ||||||||||||
| AG2-077 | Active |
| ||||||||||||
| AG2-451 | Active |
| ||||||||||||
| AG2-161 | Active |
| ||||||||||||
| AG2-213 | Active |
| ||||||||||||
| AH1-721 | Active |
|
Cost Summary
Table below shows a summary of the total planning level cost estimates for each individual New Service Request received by PJM and studied in Transition Cycle 2 Phase I. These network upgrade costs are subject to change as a result of a facility study performed by the Interconnected Transmission Owner during the Phase II and III System Impact Studies.
| Project ID | Transmission Owner Interconnection Facilities (TOIF) | Physical Interconnection Network Upgrades | System Reliability Network Upgrades | Affected System Study Reinforcements | Additional Charges | Total Cost |
|---|---|---|---|---|---|---|
| AG2-005 | $0 | $0 | $57,703,292 | $0 | $0 | $57,703,292 |
| AG2-010 | $1,200,000 | $18,000,000 | $3,498,668 | $0 | $0 | $22,698,668 |
| AG2-014 | $0 | $0 | $164,294 | $0 | $352,000 | $516,294 |
| AG2-016 | $1,015,090 | $1,352,985 | $0 | $0 | $57,200 | $2,425,275 |
| AG2-029 | $0 | $31,735,000 | $114,010,999 | $0 | $0 | $145,745,999 |
| AG2-037 | $33,300 | $0 | $144,300 | $0 | $0 | $177,600 |
| AG2-049 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-057 | $29,400 | $24,500 | $0 | $0 | $3,500 | $57,400 |
| AG2-061 | $0 | $0 | $0 | $0 | $350,000 | $350,000 |
| AG2-062 | $4,374,112 | $0 | $0 | $0 | $59,600 | $4,433,712 |
| AG2-063 | $269,015 | $4,660,322 | $22,661,505 | $0 | $19,467 | $27,610,309 |
| AG2-068 | $1,100,000 | $7,500,000 | $8,118,601 | $0 | $0 | $16,718,601 |
| AG2-069 | $1,100,000 | $7,500,000 | $12,178,116 | $0 | $0 | $20,778,116 |
| AG2-072 | $0 | $13,194,000 | $242,998,405 | $222,000,000 | $0 | $478,192,405 |
| AG2-073 | $755,000 | $9,860,000 | $13,796,988 | $0 | $0 | $24,411,988 |
| AG2-074 | $922,531 | $2,109,305 | $0 | $0 | $0 | $3,031,836 |
| AG2-077 | $0 | $0 | $68,125,603 | $0 | $0 | $68,125,603 |
| AG2-081 | $755,000 | $21,340,000 | $2,500,908 | $11,571,429 | $0 | $36,167,336 |
| AG2-082 | $0 | $2,326,000 | $0 | $0 | $0 | $2,326,000 |
| AG2-085 | $0 | $0 | $0 | $0 | $176,000 | $176,000 |
| AG2-086 | $0 | $26,400,000 | $0 | $0 | $0 | $26,400,000 |
| AG2-088 | $3,500,000 | $8,000,000 | $25,765,763 | $0 | $0 | $37,265,763 |
| AG2-090 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-091 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-093 | $1,500,000 | $17,500,000 | $31,582,553 | $0 | $0 | $50,582,553 |
| AG2-095 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-104 | $0 | $0 | $62,232,419 | $0 | $2,232,000 | $64,464,419 |
| AG2-106 | $0 | $0 | $25,668,070 | $0 | $1,280,000 | $26,948,070 |
| AG2-107 | $0 | $0 | $25,668,070 | $0 | $1,280,000 | $26,948,070 |
| AG2-109 | $1,787,012 | $12,051,999 | $361,264 | $0 | $58,400 | $14,258,675 |
| AG2-111 | $0 | $0 | $4,824,591 | $0 | $0 | $4,824,591 |
| AG2-112 | $0 | $0 | $5,057,464 | $0 | $0 | $5,057,464 |
| AG2-114 | $1,800,000 | $45,000,000 | $27,967,764 | $0 | $0 | $74,767,764 |
| AG2-119 | $823,627 | $3,550,485 | $0 | $0 | $59,600 | $4,433,712 |
| AG2-120 | $0 | $16,500,000 | $0 | $0 | $0 | $16,500,000 |
| AG2-121 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-124 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-125 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-126 | $0 | $0 | $335,819 | $0 | $352,000 | $687,819 |
| AG2-148 | $0 | $10,908,000 | $646,603 | $0 | $0 | $11,554,603 |
| AG2-149 | $0 | $17,839,000 | $79,781,179 | $0 | $0 | $97,620,179 |
| AG2-151 | $1,200,000 | $16,200,000 | $19,302,389 | $0 | $0 | $36,702,389 |
| AG2-152 | $0 | $18,578,995 | $20,522,088 | $0 | $0 | $39,101,083 |
| AG2-159 | $7,125,000 | $9,685,000 | $2,002,480 | $0 | $0 | $18,812,480 |
| AG2-161 | $922,531 | $2,109,305 | $48,129,277 | $0 | $0 | $51,161,113 |
| AG2-162 | $0 | $57,163,800 | $0 | $0 | $0 | $57,163,800 |
| AG2-163 | $0 | $0 | $1,159,717 | $0 | $352,000 | $1,511,717 |
| AG2-164 | $0 | $57,163,800 | $56,120,342 | $0 | $12,890,000 | $126,174,142 |
| AG2-165 | $0 | $63,312,070 | $116,795,770 | $0 | $0 | $180,107,840 |
| AG2-166 | $922,531 | $2,109,305 | $0 | $0 | $0 | $3,031,836 |
| AG2-171 | $1,200,000 | $16,200,000 | $25,063,421 | $0 | $0 | $42,463,421 |
| AG2-176 | $807,044 | $3,478,999 | $46,764,271 | $0 | $58,400 | $51,108,714 |
| AG2-179 | $2,000,000 | $5,310,000 | $14,641,159 | $200,840 | $0 | $22,152,000 |
| AG2-181 | $0 | $25,500,000 | $19,580,000 | $0 | $0 | $45,080,000 |
| AG2-182 | $2,200,000 | $29,000,000 | $0 | $0 | $0 | $31,200,000 |
| AG2-184 | $0 | $17,307,587 | $11,352,284 | $0 | $0 | $28,659,871 |
| AG2-188 | $1,500,000 | $17,500,000 | $34,849,620 | $0 | $0 | $53,849,620 |
| AG2-191 | $0 | $0 | $400,254 | $0 | $352,000 | $752,254 |
| AG2-192 | $0 | $0 | $299,746 | $0 | $176,000 | $475,746 |
| AG2-193 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-198 | $750,000 | $8,750,000 | $25,734,941 | $0 | $0 | $35,234,941 |
| AG2-200 | $285,787 | $193,050 | $3,682,921 | $0 | $57,200 | $4,218,958 |
| AG2-206 | $411,814 | $7,363,327 | $667,118 | $0 | $29,800 | $8,472,059 |
| AG2-208 | $0 | $0 | $3,284,980 | $0 | $0 | $3,284,980 |
| AG2-212 | $0 | $63,312,070 | $116,795,770 | $0 | $304,000 | $180,411,840 |
| AG2-213 | $1,200,000 | $16,200,000 | $34,986,675 | $0 | $0 | $52,386,675 |
| AG2-215 | $0 | $0 | $48,047,118 | $0 | $0 | $48,047,118 |
| AG2-216 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-219 | $0 | $57,163,800 | $85,756,857 | $0 | $304,000 | $143,224,657 |
| AG2-220 | $411,814 | $7,479,853 | $432,571 | $0 | $29,800 | $8,354,037 |
| AG2-221 | $0 | $0 | $278,989 | $0 | $0 | $278,989 |
| AG2-230 | $0 | $3,935,000 | $9,086 | $0 | $0 | $3,944,086 |
| AG2-236 | $58,800 | $49,000 | $0 | $0 | $7,000 | $114,800 |
| AG2-237 | $0 | $0 | $2,770,165 | $0 | $0 | $2,770,165 |
| AG2-238 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-239 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-240 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-245 | $0 | $32,726,152 | $18,461,478 | $0 | $0 | $51,187,630 |
| AG2-248 | $0 | $8,930,000 | $0 | $0 | $0 | $8,930,000 |
| AG2-249 | $403,522 | $7,373,236 | $20,592,369 | $0 | $29,200 | $28,398,328 |
| AG2-250 | $403,522 | $7,373,236 | $20,592,369 | $0 | $29,200 | $28,398,328 |
| AG2-262 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-270 | $3,500,000 | $14,500,000 | $38,189,600 | $0 | $0 | $56,189,600 |
| AG2-272 | $0 | $4,652,000 | $48,651 | $0 | $0 | $4,700,651 |
| AG2-279 | $925,715 | $1,174,235 | $0 | $0 | $57,200 | $2,157,150 |
| AG2-281 | $1,250,000 | $50,250,000 | $6,552,699 | $0 | $0 | $58,052,699 |
| AG2-288 | $4,374,112 | $0 | $9,809,215 | $0 | $59,600 | $14,242,927 |
| AG2-289 | $0 | $8,548,500 | $0 | $0 | $0 | $8,548,500 |
| AG2-290 | $0 | $8,548,500 | $0 | $0 | $352,000 | $8,900,500 |
| AG2-297 | $1,250,000 | $2,500,000 | $0 | $0 | $0 | $3,750,000 |
| AG2-298 | $755,000 | $11,215,000 | $14,665,904 | $0 | $0 | $26,635,904 |
| AG2-300 | $4,374,112 | $0 | $0 | $0 | $59,600 | $4,433,712 |
| AG2-304 | $3,500,000 | $8,000,000 | $6,102,427 | $0 | $0 | $17,602,427 |
| AG2-310 | $0 | $4,720,000 | $631,209 | $0 | $0 | $5,351,209 |
| AG2-311 | $0 | $26,432,226 | $12,008,717 | $0 | $0 | $38,440,943 |
| AG2-320 | $3,500,000 | $8,000,000 | $3,449,839 | $0 | $0 | $14,949,839 |
| AG2-327 | $411,814 | $7,363,327 | $139,011 | $0 | $29,800 | $7,943,952 |
| AG2-328 | $0 | $63,312,070 | $116,795,770 | $0 | $304,000 | $180,411,840 |
| AG2-329 | $0 | $10,908,000 | $1,618,069 | $0 | $352,000 | $12,878,069 |
| AG2-330 | $0 | $63,312,070 | $0 | $0 | $12,890,000 | $76,202,070 |
| AG2-331 | $0 | $57,163,800 | $45,381 | $0 | $304,000 | $57,513,181 |
| AG2-332 | $0 | $8,930,000 | $0 | $0 | $352,000 | $9,282,000 |
| AG2-338 | $2,100,000 | $1,750,000 | $6,933,189 | $0 | $0 | $10,783,189 |
| AG2-339 | $2,100,000 | $1,750,000 | $17,333,101 | $0 | $0 | $21,183,101 |
| AG2-341 | $3,200,000 | $5,000,000 | $1,517,742 | $0 | $0 | $9,717,742 |
| AG2-343 | $0 | $5,027,000 | $412,002 | $0 | $0 | $5,439,002 |
| AG2-344 | $0 | $0 | $539,908 | $0 | $352,000 | $891,908 |
| AG2-345 | $0 | $0 | $0 | $0 | $352,000 | $352,000 |
| AG2-347 | $1,250,000 | $12,500,000 | $65,749,049 | $0 | $0 | $79,499,049 |
| AG2-356 | $0 | $0 | $278,989 | $0 | $0 | $278,989 |
| AG2-360 | $0 | $10,452,000 | $90,018 | $0 | $0 | $10,542,018 |
| AG2-363 | $900,000 | $2,050,000 | $100,482,398 | $14,193,264 | $175,000 | $117,800,662 |
| AG2-364 | $900,000 | $2,050,000 | $66,987,604 | $9,462,138 | $175,000 | $79,574,742 |
| AG2-365 | $807,044 | $13,673,373 | $11,085,734 | $0 | $58,400 | $25,624,551 |
| AG2-366 | $3,200,000 | $2,500,000 | $112,878,868 | $0 | $0 | $118,578,868 |
| AG2-369 | $2,200,000 | $15,000,000 | $8,027,404 | $0 | $0 | $25,227,404 |
| AG2-370 | $0 | $0 | $7,600,000 | $0 | $352,000 | $7,952,000 |
| AG2-378 | $269,015 | $4,660,322 | $22,661,505 | $0 | $19,467 | $27,610,309 |
| AG2-380 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-382 | $1,750,000 | $9,500,000 | $632,154 | $0 | $0 | $11,882,154 |
| AG2-384 | $3,500,000 | $14,000,000 | $43,897 | $0 | $0 | $17,543,897 |
| AG2-385 | $269,015 | $4,660,322 | $8,393,150 | $0 | $19,467 | $13,341,954 |
| AG2-400 | $0 | $0 | $3,095,410 | $0 | $176,000 | $3,271,410 |
| AG2-401 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-402 | $0 | $0 | $0 | $0 | $176,000 | $176,000 |
| AG2-403 | $442,383 | $16,348,179 | $0 | $0 | $30,400 | $16,820,962 |
| AG2-404 | $442,383 | $16,348,179 | $0 | $0 | $30,400 | $16,820,962 |
| AG2-405 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-406 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-408 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-411 | $823,627 | $3,550,485 | $10,098,813 | $0 | $59,600 | $14,532,525 |
| AG2-418 | $823,627 | $12,974,686 | $66,928,102 | $0 | $59,600 | $80,786,015 |
| AG2-420 | $285,787 | $100,100 | $1,337,050 | $0 | $57,200 | $1,780,137 |
| AG2-423 | $823,627 | $16,449,706 | $5,974,200 | $0 | $59,600 | $23,307,133 |
| AG2-424 | $755,000 | $8,385,000 | $5,174,261 | $1,891,549 | $0 | $16,205,810 |
| AG2-426 | $1,200,000 | $16,200,000 | $33,610,021 | $0 | $0 | $51,010,021 |
| AG2-427 | $3,200,000 | $20,500,000 | $50,127,691 | $0 | $0 | $73,827,691 |
| AG2-428 | $3,200,000 | $30,000,000 | $219,900,998 | $0 | $0 | $253,100,998 |
| AG2-429 | $823,627 | $16,449,706 | $28,156,946 | $0 | $59,600 | $45,489,879 |
| AG2-430 | $922,531 | $2,109,305 | $60,312,937 | $0 | $0 | $63,344,772 |
| AG2-436 | $2,200,000 | $29,000,000 | $225,783,917 | $0 | $0 | $256,983,917 |
| AG2-438 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-439 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-440 | $600,000 | $4,300,000 | $91,667,498 | $0 | $0 | $96,567,498 |
| AG2-441 | $600,000 | $4,300,000 | $114,584,719 | $0 | $0 | $119,484,719 |
| AG2-442 | $1,200,000 | $8,600,000 | $129,445,338 | $0 | $0 | $139,245,338 |
| AG2-444 | $0 | $33,079,168 | $9,582,064 | $0 | $0 | $42,661,232 |
| AG2-447 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-448 | $823,627 | $15,332,146 | $25,310,241 | $0 | $59,600 | $41,525,614 |
| AG2-449 | $0 | $57,163,800 | $0 | $0 | $304,000 | $57,467,800 |
| AG2-450 | $1,250,000 | $10,000,000 | $0 | $0 | $0 | $11,250,000 |
| AG2-451 | $300,000 | $1,500,000 | $0 | $0 | $0 | $1,800,000 |
| AG2-453 | $1,800,000 | $45,000,000 | $89,508,926 | $1,856,124 | $0 | $138,165,050 |
| AG2-456 | $140,035 | $2,432,807 | $57,889,355 | $0 | $10,133 | $60,472,330 |
| AG2-457 | $140,035 | $2,432,807 | $57,889,355 | $0 | $10,133 | $60,472,330 |
| AG2-458 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-459 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-460 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-469 | $1,500,000 | $17,500,000 | $77,231,945 | $0 | $0 | $96,231,945 |
| AG2-476 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-477 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-478 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-479 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-481 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-484 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-487 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-491 | $0 | $0 | $706,478 | $0 | $176,000 | $882,478 |
| AG2-492 | $0 | $0 | $164,294 | $0 | $176,000 | $340,294 |
| AG2-505 | $823,627 | $16,106,946 | $14,765,067 | $0 | $59,600 | $31,755,240 |
| AG2-515 | $843,231 | $5,363,341 | $9,885,273 | $0 | $60,800 | $16,152,645 |
| AG2-516 | $1,800,000 | $35,000,000 | $0 | $0 | $0 | $36,800,000 |
| AG2-518 | $0 | $3,853,000 | $3,687,496 | $0 | $0 | $7,540,496 |
| AG2-519 | $0 | $16,775,000 | $0 | $0 | $0 | $16,775,000 |
| AG2-522 | $0 | $16,200,000 | $6,240,570 | $0 | $0 | $22,440,570 |
| AG2-524 | $1,800,000 | $35,000,000 | $2,800,000 | $42,433 | $0 | $39,642,433 |
| AG2-532 | $925,715 | $1,224,285 | $39,796,796 | $0 | $57,200 | $42,003,996 |
| AG2-533 | $925,715 | $1,224,285 | $40,491,190 | $0 | $57,200 | $42,698,390 |
| AG2-534 | $925,715 | $1,224,285 | $45,127,747 | $0 | $57,200 | $47,334,947 |
| AG2-535 | $823,627 | $12,582,335 | $46,472,286 | $0 | $59,600 | $59,937,848 |
| AG2-541 | $1,200,000 | $16,200,000 | $19,973,877 | $0 | $0 | $37,373,877 |
| AG2-544 | $900,000 | $3,750,000 | $0 | $0 | $175,000 | $4,825,000 |
| AG2-545 | $900,000 | $3,750,000 | $0 | $0 | $175,000 | $4,825,000 |
| AG2-548 | $0 | $7,417,500 | $12,074,648 | $0 | $0 | $19,492,148 |
| AG2-550 | $0 | $0 | $22,991,797 | $0 | $352,000 | $23,343,797 |
| AG2-551 | $0 | $0 | $1,538,640 | $0 | $176,000 | $1,714,640 |
| AG2-553 | $1,945,000 | $6,300,000 | $0 | $0 | $0 | $8,245,000 |
| AG2-561 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-562 | $0 | $111,000 | $0 | $0 | $0 | $111,000 |
| AG2-564 | $0 | $16,698,401 | $0 | $0 | $0 | $16,698,401 |
| AG2-566 | $750,000 | $8,750,000 | $6,950,656 | $0 | $0 | $16,450,656 |
| AG2-568 | $0 | $18,139,000 | $0 | $0 | $0 | $18,139,000 |
| AG2-570 | $1,100,000 | $14,500,000 | $92,859,318 | $0 | $0 | $108,459,318 |
| AG2-571 | $1,100,000 | $14,500,000 | $18,818,261 | $0 | $0 | $34,418,261 |
| AG2-575 | $0 | $0 | $7,576,273 | $38,579 | $350,000 | $7,964,852 |
| AG2-581 | $2,200,000 | $29,000,000 | $43,714,336 | $0 | $0 | $74,914,336 |
| AG2-582 | $7,130,657 | $0 | $174,887,472 | $0 | $60,800 | $182,078,929 |
| AG2-583 | $1,500,000 | $17,500,000 | $20,995,576 | $0 | $0 | $39,995,576 |
| AG2-585 | $0 | $0 | $0 | $43,191 | $350,000 | $393,191 |
| AG2-589 | $0 | $17,647,804 | $0 | $0 | $0 | $17,647,804 |
| AG2-615 | $823,627 | $15,868,606 | $195,865,978 | $0 | $59,600 | $212,617,811 |
| AG2-616 | $625,000 | $12,000,000 | $341,652 | $0 | $0 | $12,966,652 |
| AG2-617 | $9,000,000 | $1,200,000 | $0 | $0 | $0 | $10,200,000 |
| AG2-618 | $200,000 | $3,500,000 | $0 | $0 | $0 | $3,700,000 |
| AG2-621 | $4,374,112 | $0 | $0 | $0 | $59,600 | $4,433,712 |
| AG2-625 | $943,590 | $1,260,035 | $0 | $0 | $57,200 | $2,260,825 |
| AG2-626 | $967,424 | $1,307,701 | $0 | $0 | $57,200 | $2,332,325 |
| AG2-627 | $1,250,000 | $24,250,000 | $0 | $0 | $0 | $25,500,000 |
| AG2-637 | $0 | $16,775,000 | $41,514,707 | $0 | $0 | $58,289,707 |
| AG2-646 | $3,500,000 | $7,000,000 | $104,397,510 | $0 | $0 | $114,897,510 |
| AG2-654 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-657 | $0 | $20,670,801 | $180,499 | $0 | $0 | $20,851,300 |
| AG2-658 | $4,374,112 | $0 | $252,333,790 | $0 | $59,600 | $256,767,502 |
| AG2-659 | $1,200,000 | $16,200,000 | $9,794,997 | $0 | $0 | $27,194,997 |
| AG2-660 | $0 | $0 | $14,386,707 | $1,024,494 | $87,500 | $15,498,702 |
| AG2-661 | $0 | $0 | $0 | $0 | $0 | $0 |
| AG2-665 | $0 | $7,417,500 | $12,074,648 | $0 | $352,000 | $19,844,148 |
| AG2-670 | $1,175,000 | $20,715,000 | $2,341,100 | $2,574,101 | $0 | $26,805,202 |
| AG2-675 | $0 | $0 | $0 | $0 | $350,000 | $350,000 |
| AH1-004 | $1,145,000 | $14,420,000 | $3,334,641 | $15,428,571 | $0 | $34,328,212 |
| AH1-005 | $411,814 | $7,479,853 | $279,055 | $0 | $29,800 | $8,200,521 |
| AH1-012 | $1,500,000 | $17,500,000 | $573,823 | $0 | $0 | $19,573,823 |
| AH1-027 | $1,250,000 | $6,000,000 | $0 | $0 | $0 | $7,250,000 |
| AH1-033 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-034 | $755,000 | $9,310,000 | $40,843,100 | $137,146 | $0 | $51,045,246 |
| AH1-035 | $0 | $18,000,000 | $0 | $0 | $0 | $18,000,000 |
| AH1-040 | $1,200,000 | $16,200,000 | $4,419,812 | $0 | $0 | $21,819,812 |
| AH1-042 | $1,200,000 | $16,200,000 | $79,416,415 | $0 | $0 | $96,816,415 |
| AH1-044 | $0 | $0 | $112,788,337 | $8,812,294 | $87,500 | $121,688,131 |
| AH1-047 | $1,500,000 | $35,000,000 | $0 | $0 | $0 | $36,500,000 |
| AH1-050 | $274,542 | $5,483,235 | $12,699,556 | $0 | $19,867 | $18,477,201 |
| AH1-051 | $274,542 | $5,483,235 | $7,619,826 | $0 | $19,867 | $13,397,470 |
| AH1-054 | $919,757 | $1,212,368 | $0 | $0 | $57,200 | $2,189,325 |
| AH1-055 | $0 | $32,702,000 | $1,458,266 | $0 | $0 | $34,160,266 |
| AH1-056 | $0 | $0 | $81,040,161 | $0 | $0 | $81,040,161 |
| AH1-057 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-059 | $0 | $0 | $16,000,000 | $0 | $352,000 | $16,352,000 |
| AH1-060 | $29,400 | $24,500 | $0 | $0 | $3,500 | $57,400 |
| AH1-065 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-066 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-069 | $403,522 | $7,044,736 | $0 | $0 | $29,200 | $7,477,458 |
| AH1-070 | $403,522 | $7,044,736 | $0 | $0 | $29,200 | $7,477,458 |
| AH1-071 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-072 | $0 | $24,950,750 | $0 | $0 | $0 | $24,950,750 |
| AH1-073 | $0 | $24,950,750 | $0 | $0 | $2,494,569 | $27,445,319 |
| AH1-075 | $0 | $0 | $3,540,553 | $0 | $352,000 | $3,892,553 |
| AH1-086 | $875,000 | $1,375,000 | $0 | $0 | $0 | $2,250,000 |
| AH1-087 | $875,000 | $1,375,000 | $0 | $0 | $0 | $2,250,000 |
| AH1-088 | $875,000 | $1,375,000 | $0 | $0 | $0 | $2,250,000 |
| AH1-089 | $875,000 | $1,375,000 | $0 | $0 | $0 | $2,250,000 |
| AH1-091 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-098 | $0 | $16,775,000 | $0 | $0 | $0 | $16,775,000 |
| AH1-102 | $411,814 | $8,224,853 | $16,150,053 | $0 | $29,800 | $24,816,519 |
| AH1-106 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-107 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-108 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-124 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-125 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-127 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-128 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-133 | $0 | $16,775,000 | $48,587 | $0 | $0 | $16,823,587 |
| AH1-136 | $0 | $16,762,000 | $0 | $0 | $0 | $16,762,000 |
| AH1-138 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-140 | $823,547 | $34,788,952 | $22,967,848 | $0 | $59,600 | $58,639,947 |
| AH1-144 | $0 | $9,538,600 | $57,359 | $0 | $0 | $9,595,960 |
| AH1-145 | $0 | $9,538,600 | $16,000 | $0 | $352,000 | $9,906,600 |
| AH1-146 | $750,000 | $22,500,000 | $81,978,990 | $8,681,349 | $175,000 | $114,085,339 |
| AH1-147 | $750,000 | $22,500,000 | $81,978,990 | $8,681,349 | $175,000 | $114,085,339 |
| AH1-150 | $0 | $0 | $112,788,337 | $8,812,294 | $87,500 | $121,688,131 |
| AH1-151 | $0 | $0 | $112,788,337 | $8,812,294 | $87,500 | $121,688,131 |
| AH1-153 | $0 | $3,935,000 | $9,086 | $0 | $352,000 | $4,296,086 |
| AH1-157 | $1,500,000 | $17,500,000 | $9,837,220 | $0 | $0 | $28,837,220 |
| AH1-158 | $274,542 | $5,483,235 | $9,504,953 | $0 | $19,867 | $15,282,597 |
| AH1-164 | $0 | $18,056,079 | $0 | $0 | $0 | $18,056,079 |
| AH1-165 | $1,800,000 | $2,400,000 | $0 | $0 | $0 | $4,200,000 |
| AH1-170 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-188 | $0 | $69,534,792 | $62,066 | $0 | $0 | $69,596,858 |
| AH1-196 | $0 | $0 | $0 | $46,145 | $350,000 | $396,145 |
| AH1-201 | $411,814 | $7,479,853 | $5,379,562 | $0 | $29,800 | $13,301,028 |
| AH1-203 | $823,627 | $15,570,606 | $18,687,317 | $0 | $59,600 | $35,141,150 |
| AH1-205 | $411,814 | $7,479,853 | $3,668,108 | $0 | $29,800 | $11,589,574 |
| AH1-206 | $4,374,112 | $0 | $0 | $0 | $59,600 | $4,433,712 |
| AH1-212 | $1,388,128 | $1,790,929 | $4,947,596 | $0 | $57,200 | $8,183,853 |
| AH1-215 | $1,200,000 | $16,200,000 | $19,385,442 | $0 | $0 | $36,785,442 |
| AH1-216 | $1,500,000 | $17,500,000 | $5,825,326 | $0 | $0 | $24,825,326 |
| AH1-217 | $1,200,000 | $16,200,000 | $10,238,172 | $0 | $0 | $27,638,172 |
| AH1-220 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-221 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-223 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-227 | $0 | $14,070,000 | $325,327 | $0 | $0 | $14,395,327 |
| AH1-234 | $1,500,000 | $45,000,000 | $13,625,291 | $1,349,327 | $0 | $61,474,618 |
| AH1-239 | $755,000 | $13,285,000 | $16,837,554 | $179,430 | $0 | $31,056,984 |
| AH1-241 | $1,200,000 | $16,200,000 | $20,436,221 | $0 | $0 | $37,836,221 |
| AH1-247 | $274,542 | $5,483,235 | $0 | $0 | $19,867 | $5,777,644 |
| AH1-248 | $274,542 | $5,483,235 | $0 | $0 | $19,867 | $5,777,644 |
| AH1-249 | $274,542 | $5,483,235 | $0 | $0 | $19,867 | $5,777,644 |
| AH1-251 | $1,200,000 | $16,200,000 | $0 | $0 | $0 | $17,400,000 |
| AH1-254 | $58,800 | $49,000 | $0 | $0 | $7,000 | $114,800 |
| AH1-257 | $919,757 | $1,162,317 | $4,505,192 | $0 | $57,200 | $6,644,466 |
| AH1-258 | $919,757 | $1,162,317 | $0 | $0 | $57,200 | $2,139,274 |
| AH1-260 | $1,250,000 | $24,307,000 | $0 | $0 | $0 | $25,557,000 |
| AH1-261 | $10,000,000 | $2,000,000 | $0 | $0 | $0 | $12,000,000 |
| AH1-263 | $3,200,000 | $4,500,000 | $10,204,615 | $0 | $0 | $17,904,615 |
| AH1-265 | $1,250,000 | $27,000,000 | $0 | $0 | $0 | $28,250,000 |
| AH1-268 | $411,814 | $8,224,853 | $7,396,235 | $0 | $29,800 | $16,062,702 |
| AH1-269 | $0 | $5,487,067 | $947,937 | $0 | $0 | $6,435,004 |
| AH1-271 | $1,750,000 | $9,500,000 | $361,228 | $0 | $0 | $11,611,228 |
| AH1-272 | $0 | $31,073,000 | $11,224 | $0 | $0 | $31,084,224 |
| AH1-274 | $0 | $18,300,000 | $0 | $0 | $0 | $18,300,000 |
| AH1-280 | $0 | $0 | $5,071,937 | $0 | $0 | $5,071,937 |
| AH1-281 | $755,000 | $13,495,000 | $0 | $0 | $0 | $14,250,000 |
| AH1-282 | $0 | $34,166,000 | $0 | $0 | $0 | $34,166,000 |
| AH1-283 | $884,166 | $32,396,358 | $0 | $0 | $60,800 | $33,341,324 |
| AH1-285 | $1,500,000 | $45,000,000 | $2,930,824 | $0 | $0 | $49,430,824 |
| AH1-292 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-298 | $1,000,000 | $19,000,000 | $0 | $0 | $0 | $20,000,000 |
| AH1-302 | $0 | $0 | $0 | $0 | $352,000 | $352,000 |
| AH1-304 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-305 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-306 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-308 | $0 | $0 | $4,655,658 | $0 | $352,000 | $5,007,658 |
| AH1-309 | $0 | $0 | $0 | $0 | $352,000 | $352,000 |
| AH1-311 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-313 | $823,627 | $4,006,875 | $142,145,060 | $0 | $59,600 | $147,035,162 |
| AH1-314 | $0 | $4,763,000 | $2,528,754 | $0 | $0 | $7,291,754 |
| AH1-323 | $3,500,000 | $25,000,000 | $5,811,987 | $0 | $0 | $34,311,987 |
| AH1-324 | $1,500,000 | $17,500,000 | $3,910,688 | $0 | $0 | $22,910,688 |
| AH1-327 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-328 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-334 | $985,299 | $1,293,401 | $0 | $0 | $57,200 | $2,335,900 |
| AH1-337 | $0 | $18,410,000 | $269,114 | $0 | $0 | $18,679,114 |
| AH1-338 | $1,500,000 | $35,000,000 | $24,187,953 | $610,019 | $0 | $61,297,973 |
| AH1-339 | $0 | $4,363,000 | $23,040,195 | $0 | $0 | $27,403,195 |
| AH1-340 | $823,627 | $16,104,903 | $8,699,919 | $0 | $59,600 | $25,688,049 |
| AH1-341 | $1,500,000 | $35,000,000 | $3,121,947 | $43,953 | $0 | $39,665,900 |
| AH1-343 | $1,200,000 | $16,200,000 | $23,156,036 | $0 | $0 | $40,556,036 |
| AH1-345 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-348 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-357 | $140,035 | $2,432,807 | $14,473,306 | $0 | $10,133 | $17,056,281 |
| AH1-358 | $140,035 | $2,432,807 | $16,862,525 | $0 | $10,133 | $19,445,500 |
| AH1-359 | $140,035 | $2,432,807 | $14,473,306 | $0 | $10,133 | $17,056,281 |
| AH1-360 | $140,035 | $2,432,807 | $16,862,525 | $0 | $10,133 | $19,445,500 |
| AH1-367A | $807,044 | $3,478,999 | $0 | $0 | $58,400 | $4,344,443 |
| AH1-377 | $1,500,000 | $17,500,000 | $61,547,600 | $0 | $0 | $80,547,600 |
| AH1-380 | $1,250,000 | $31,000,000 | $0 | $0 | $0 | $32,250,000 |
| AH1-387 | $884,766 | $32,396,358 | $0 | $0 | $60,800 | $33,341,924 |
| AH1-391 | $0 | $6,993,000 | $7,786,453 | $0 | $0 | $14,779,453 |
| AH1-392 | $0 | $17,748,000 | $0 | $0 | $0 | $17,748,000 |
| AH1-396 | $0 | $0 | $2,456,968 | $0 | $0 | $2,456,968 |
| AH1-397 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-399 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-408 | $1,200,000 | $16,200,000 | $15,982,827 | $0 | $0 | $33,382,827 |
| AH1-426 | $411,814 | $1,775,242 | $60,143,935 | $0 | $29,800 | $62,360,791 |
| AH1-426A | $411,814 | $1,775,242 | $30,072,346 | $0 | $29,800 | $32,289,202 |
| AH1-427 | $755,000 | $11,465,000 | $49,559,186 | $92,624 | $0 | $61,871,809 |
| AH1-439 | $1,500,000 | $17,500,000 | $20,497,788 | $0 | $0 | $39,497,788 |
| AH1-452 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-460 | $823,627 | $16,129,356 | $15,227,239 | $0 | $59,600 | $32,239,822 |
| AH1-461 | $0 | $20,819,328 | $0 | $0 | $0 | $20,819,328 |
| AH1-482 | $0 | $0 | $24,513 | $0 | $352,000 | $376,513 |
| AH1-487 | $0 | $0 | $1,735,851 | $0 | $0 | $1,735,851 |
| AH1-490 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-491 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-528 | $2,200,000 | $29,000,000 | $155,398,160 | $0 | $0 | $186,598,160 |
| AH1-535 | $0 | $32,928,423 | $25,767 | $0 | $0 | $32,954,190 |
| AH1-536 | $1,250,000 | $24,250,000 | $2,740,566 | $0 | $0 | $28,240,566 |
| AH1-537 | $0 | $32,804,000 | $1,244,140 | $0 | $0 | $34,048,140 |
| AH1-539 | $0 | $4,763,000 | $118,966,906 | $0 | $0 | $123,729,906 |
| AH1-541 | $1,800,000 | $3,400,000 | $32,897,305 | $0 | $0 | $38,097,305 |
| AH1-542 | $823,627 | $16,449,706 | $0 | $0 | $59,600 | $17,332,933 |
| AH1-543 | $1,500,000 | $45,000,000 | $3,657,373 | $413,738 | $0 | $50,571,111 |
| AH1-545 | $843,231 | $26,288,724 | $0 | $0 | $60,800 | $27,192,755 |
| AH1-546 | $1,500,000 | $17,500,000 | $16,580,024 | $0 | $0 | $35,580,024 |
| AH1-552 | $4,000,000 | $2,000,000 | $0 | $0 | $0 | $6,000,000 |
| AH1-563 | $0 | $0 | $2,600,000 | $0 | $350,000 | $2,950,000 |
| AH1-564 | $0 | $0 | $500,000 | $0 | $350,000 | $850,000 |
| AH1-567 | $0 | $0 | $0 | $0 | $350,000 | $350,000 |
| AH1-570 | $377,500 | $4,767,500 | $0 | $0 | $0 | $5,145,000 |
| AH1-571 | $377,500 | $4,767,500 | $0 | $0 | $0 | $5,145,000 |
| AH1-577 | $0 | $2,398,008 | $115,789 | $0 | $0 | $2,513,798 |
| AH1-578 | $0 | $2,398,008 | $84,211 | $0 | $528,000 | $3,010,219 |
| AH1-580 | $0 | $2,326,000 | $0 | $0 | $352,000 | $2,678,000 |
| AH1-584 | $416,667 | $37,666,667 | $38,229,021 | $0 | $0 | $76,312,354 |
| AH1-585 | $416,667 | $37,666,667 | $38,229,021 | $0 | $0 | $76,312,354 |
| AH1-586 | $416,667 | $37,666,667 | $41,400,457 | $0 | $0 | $79,483,790 |
| AH1-587 | $823,627 | $16,501,856 | $244,107,909 | $0 | $59,600 | $261,492,992 |
| AH1-588 | $420,105 | $2,432,807 | $211,443,375 | $0 | $30,400 | $214,326,687 |
| AH1-589 | $420,105 | $2,432,807 | $174,694,828 | $0 | $30,400 | $177,578,140 |
| AH1-617 | $0 | $17,307,587 | $10,811,730 | $0 | $0 | $28,119,317 |
| AH1-634 | $0 | $0 | $9,895,095 | $0 | $0 | $9,895,095 |
| AH1-637 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-641 | $625,000 | $12,000,000 | $102,506 | $0 | $0 | $12,727,506 |
| AH1-644 | $0 | $18,115,000 | $3,705,586 | $0 | $0 | $21,820,586 |
| AH1-661 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-664 | $572,500 | $8,297,500 | $22,363,686 | $0 | $0 | $31,233,686 |
| AH1-665 | $572,500 | $8,297,500 | $17,890,841 | $0 | $0 | $26,760,841 |
| AH1-666 | $1,145,000 | $18,730,000 | $16,756,003 | $0 | $0 | $36,631,003 |
| AH1-667 | $285,787 | $100,100 | $494,900 | $0 | $57,200 | $937,987 |
| AH1-669 | $0 | $16,775,000 | $14,087,980 | $0 | $0 | $30,862,980 |
| AH1-670 | $1,800,000 | $45,000,000 | $154,635,329 | $0 | $0 | $201,435,329 |
| AH1-672 | $1,250,000 | $4,000,000 | $6,548,595 | $0 | $0 | $11,798,595 |
| AH1-673 | $1,800,000 | $35,000,000 | $0 | $0 | $0 | $36,800,000 |
| AH1-676 | $3,500,000 | $8,000,000 | $293,294,893 | $0 | $0 | $304,794,893 |
| AH1-677 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-678 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-679 | $0 | $0 | $1,477,423 | $0 | $0 | $1,477,423 |
| AH1-680 | $265,631 | $27,079,653 | $0 | $0 | $60,800 | $27,406,084 |
| AH1-681 | $0 | $0 | $5,547,973 | $0 | $0 | $5,547,973 |
| AH1-682 | $0 | $0 | $15,322,887 | $0 | $0 | $15,322,887 |
| AH1-683 | $0 | $0 | $18,247,274 | $0 | $0 | $18,247,274 |
| AH1-684 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-685 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-686 | $0 | $0 | $0 | $0 | $1,228,000 | $1,228,000 |
| AH1-687 | $0 | $0 | $17,273,920 | $0 | $0 | $17,273,920 |
| AH1-690 | $843,231 | $40,872,535 | $1,253,883,889 | $0 | $60,800 | $1,295,660,455 |
| AH1-691 | $0 | $0 | $18,972,231 | $0 | $0 | $18,972,231 |
| AH1-692 | $0 | $0 | $18,972,231 | $0 | $0 | $18,972,231 |
| AH1-693 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-694 | $0 | $0 | $13,135,736 | $0 | $0 | $13,135,736 |
| AH1-695 | $790,461 | $4,345,113 | $92,018,074 | $0 | $57,200 | $97,210,848 |
| AH1-696 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-698 | $0 | $0 | $0 | $0 | $350,000 | $350,000 |
| AH1-699 | $58,800 | $49,000 | $0 | $0 | $7,000 | $114,800 |
| AH1-701 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-702 | $0 | $0 | $0 | $0 | $350,000 | $350,000 |
| AH1-703 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-704 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-705 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-706 | $58,800 | $49,000 | $0 | $0 | $7,000 | $114,800 |
| AH1-707 | $0 | $0 | $89,257,786 | $0 | $0 | $89,257,786 |
| AH1-710 | $0 | $0 | $7,020,037 | $0 | $0 | $7,020,037 |
| AH1-711 | $58,800 | $49,000 | $203,511,088 | $0 | $7,000 | $203,625,888 |
| AH1-712 | $2,100,000 | $3,500,000 | $124,170,738 | $0 | $0 | $129,770,738 |
| AH1-713 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-714 | $0 | $0 | $12,007,566 | $1,279,015 | $350,000 | $13,636,581 |
| AH1-715 | $0 | $0 | $16,575,240 | $0 | $0 | $16,575,240 |
| AH1-716 | $2,200,000 | $29,000,000 | $251,329,336 | $0 | $0 | $282,529,336 |
| AH1-717 | $1,000,000 | $1,000,000 | $17,321,591 | $0 | $0 | $19,321,591 |
| AH1-718 | $0 | $0 | $0 | $0 | $350,000 | $350,000 |
| AH1-719 | $0 | $111,000 | $0 | $0 | $0 | $111,000 |
| AH1-720 | $58,800 | $0 | $5,577,857 | $0 | $7,000 | $5,643,657 |
| AH1-721 | $3,175,000 | $22,020,000 | $80,096,578 | $6,058,310 | $0 | $111,349,888 |
| AH1-722 | $0 | $0 | $21,827,760 | $0 | $0 | $21,827,760 |
| AH1-723 | $2,100,000 | $3,500,000 | $144,696,392 | $0 | $0 | $150,296,392 |
| AH1-725 | $19,000,000 | $2,000,000 | $0 | $0 | $0 | $21,000,000 |
| AH1-727 | $2,200,000 | $29,000,000 | $14,530,198 | $0 | $0 | $45,730,198 |
| AH1-729 | $3,500,000 | $6,000,000 | $3,004,996 | $0 | $0 | $12,504,996 |
| AH1-734 | $800,083 | $51,100 | $129,735 | $0 | $7,300 | $988,218 |
| AH1-735 | $58,800 | $49,000 | $0 | $0 | $7,000 | $114,800 |
| AH1-744 | $0 | $0 | $0 | $0 | $0 | $0 |
| AH1-746 | $0 | $0 | $0 | $0 | $0 | $0 |
System Reinforcements
PJM performed generator deliverability load flow analysis for the New Service Requests in Transition Cycle 2 Phase I. Load flow analysis was performed to simulate Summer Peak, Light Load and Winter Peak conditions. The table below shows all the system reinforcements identified from generator deliverability load flow analysis. Short circuit and stability analyses are not performed as part of the Phase I System Impact Study. Short circuit and stability analyses will commence in the Phase II System Impact Study.
| TO | RTEP ID / TO ID | Title | Time Estimate | Total Cost Estimate ($) | Projects with Cost Allocation | Contingent Projects |
|---|---|---|---|---|---|---|
| AEC | n7868 / ACEMickDelcorebuildr01 | Rebuild 7.6 miles of Mickleton to Delco Tap 230 kV line. | 54 to 66 Months | $34,200,000 | AG2-347, AH1-584, AH1-585, AH1-586, AH1-634 |
|
| AEP | (Pending) / | 05PETERM 138.0 kV to 05GLENL2 138.0 kV ckt 1 - Sag Study | 12 to 24 Months | $40,000 | AH1-144, AH1-145 |
|
| AEP | (Pending) / AEP-TC2-18502 | 05OLIVE 345.0 kV to 05COOK 345.0 kV ckt 1 - Sag Study | 36 to 48 Months | $117,950 | AG2-163, AG2-245, AG2-363, AG2-364, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391, AH1-482 |
|
| AEP | (Pending) / AEP-TC2-18505 | 05MISSIS 138.0 kV to 05DEER CRK1 138.0 kV ckt 1 - Replace risers | 12 to 24 Months | $700,000 | AG2-191, AG2-192 |
|
| AEP | (Pending) / AEP-TC2-18516 | 17P9700-EAST 345.0 kV to 05OLIVE 345.0 kV ckt 1 - AEP End Ratings | 36 to 48 Months | $0 | AG2-363, AG2-364, AG2-453, AG2-524, AG2-575, AG2-585, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-196, AH1-234, AH1-338, AH1-341, AH1-543, AH1-714 |
|
| AEP | (Pending) / AEP-TC2-18621 | AE1-091_POI 138.0 kV to 05W.NEWTONSS 138.0 kV ckt 1 - Rebuild | 32 to 48 Months | $36,260,000 | AH1-075, AH1-339, AH1-539 |
|
| AEP | (Pending) / AEP-TC2-18624 | AH1-133 TP 138.0 kV to 05TAZEWE 138.0 kV ckt 1 - Sag Study | 6 to 12 Months | $10,000 | AG2-184, AG2-360, AH1-133, AH1-617, AH1-721 | AH1-644 |
| AEP | (Pending) / AEP-TC2-18625 | 05HODGIN_BP 138.0 kV to 05HAYES 138.0 kV ckt 1 - Replace Conductor | 30 to 36 Months | $100,000 | AG2-550, AG2-551, AG2-637, AH1-308, AH1-337 |
|
| AEP | (Pending) / AEP-TC2-18626 | 05FLTLCK 765.0 kV to 05GAVIN_RF 765.0 kV ckt 1 - Replace Equipment | 30 to 36 Months | $2,000,000 | AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328 |
|
| AEP | (Pending) / AEP-TC2-18627 | AH1-133 TP 138.0 kV to 05TAZEWE 138.0 kV ckt 1 - Sag study | 36 to 48 Months | $110,000 | AG2-184, AG2-360, AH1-133, AH1-617, AH1-721 | AH1-644 |
| AEP | (Pending) / AEP-TC2-18630 | 05BOXWD 138.0 kV to 05CLIFFR 138.0 kV ckt 1 - Rebuild | 24 to 36 Months | $21,800,000 | AH1-690 | AG2-164, AG2-219 |
| AEP | (Pending) / AEP-TC2-18633 | AH1-337 TP 138.0 kV to 05HODGIN_BP 138.0 kV ckt 1 - Replace conductor | 12 to 18 Months | $100,000 | AG2-550, AG2-551, AG2-637, AH1-308, AH1-337 |
|
| AEP | (Pending) / AEP-TC2-18634 | 05MARYSV 765.0 kV to 05MARYSV 345.0 kV ckt 2 - Add second XFMR | 36 to 48 Months | $23,320,000 | AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18635 | 05MARYSVL_RM 765.0 kV to 05MALIS 765.0 kV ckt 1 - Replace Equipment | 24 to 36 Months | $24,200,000 | AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18636 | 05COLLEEN SS 138.0 kV to 05JAMES RIVR 138.0 kV ckt 1 - Rebuild | 24 to 48 Months | $18,000,000 | AH1-690 | AG2-164, AG2-219 |
| AEP | (Pending) / AEP-TC2-18639 | 05HAVILAND2 138.0 kV to 05HAVILAND1 138.0 kV ckt Z1 - Replace Equipment | 24 to 36 Months | $800,000 | AG2-370 |
|
| AEP | (Pending) / AEP-TC2-18642 | 05MEADOW 345.0 kV to 17REYNOLDS 345.0 kV ckt 1 - Replace Breakers | 24 to 36 Months | $2,000,000 | AG2-014, AG2-072, AG2-126, AG2-163, AG2-343, AG2-344, AG2-491, AG2-492 |
|
| AEP | (Pending) / AEP-TC2-18647 | 05JAMES RIVR 138.0 kV to 05SOAPSTONE 138.0 kV ckt 1 - Rebuild | 24 to 48 Months | $40,000,000 | AH1-690 | AG2-164, AG2-219 |
| AEP | (Pending) / AEP-TC2-18651 | 05TWIN B 345.0 kV to 05MERIDN 345.0 kV ckt 1 - Sag Study | 36 to 48 Months | $61,000 | AG2-165, AG2-212, AG2-230, AG2-245, AG2-328, AH1-153, AH1-272 | AG2-660, AH1-044, AH1-150, AH1-151 |
| AEP | (Pending) / AEP-TC2-18653 | 05MALIS 765.0 kV to 05VASSEL 765.0 kV ckt 1 - Replace Equipment | 36 to 48 Months | $153,100,000 | AG2-029, AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18654 | 05SALTV1 138.0 kV to AH1-133 TP 138.0 kV ckt 1 - Sag Study | 6 to 12 Months | $10,000 | AG2-360, AH1-721 |
|
| AEP | (Pending) / AEP-TC2-18655 | 05MUSEVILLE 138.0 kV to 05SMITHMTN 138.0 kV ckt 1 - Replace Switch | 36 to 48 Months | $500,000 | AG2-152, AG2-272, AG2-311, AH1-314 |
|
| AEP | (Pending) / AEP-TC2-18659 | 05MARYSVL_RS 765.0 kV to 05MARYSV 765.0 kV ckt Z1 - Replace Equipment | 24 to 36 Months | $9,500,000 | AG2-029, AG2-072, AG2-164, AG2-165, AG2-212, AG2-219, AG2-245, AG2-328, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18663 | 05HAVILAND1 138.0 kV to 05E LIMA 138.0 kV ckt 1 - Sag Study / Rebuild | 24 to 36 Months | $6,800,000 | AG2-370 |
|
| AEP | (Pending) / AEP-TC2-18665 | 05CLIFFR 138.0 kV to 05COLLEEN SS 138.0 kV ckt 1 - Rebuild | 24 to 36 Months | $14,700,000 | AH1-690 | AG2-164, AG2-219 |
| AEP | (Pending) / AEP-TC2-18670 | 17STILLWELL 345.0 kV to 05DUMONT 345.0 kV ckt 1 - Reconductor and Replace Equipment | 36 to 48 Months | $26,060,000 | AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-543, AH1-714 |
|
| AEP | (Pending) / AEP-TC2-18671 | 05SOAPSTONE 138.0 kV to 05SCOTSV 138.0 kV ckt 1 - Rebuild | 32 to 48 Months | $40,000,000 | AH1-690 | AG2-164, AG2-219 |
| AEP | (Pending) / AEP-TC2-18673 | 05SCHRIS 138.0 kV to 05TECHDR 138.0 kV ckt 1 - Rebuild | 18 to 24 Months | $4,750,000 | AG2-310, AG2-518, AH1-269 | AH1-144, AH1-145 |
| AEP | (Pending) / AEP-TC2-18675 | 05HARRISON 138.0 kV to 05ZUBER 138.0 kV ckt 1 - Rebuild Line | 24 to 36 Months | $16,269,340 | AG2-548, AG2-665, AH1-669 |
|
| AEP | (Pending) / AEP-TC2-18677 | 05DUMONT_RW 765.0 kV to 05DUMONT 765.0 kV ckt Z1 - Replace Breaker | 36 to 42 Months | $4,000,000 | AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-543, AH1-714 |
|
| AEP | (Pending) / AEP-TC2-18678 | 05HARRISON 138.0 kV to 05OBETZ 138.0 kV ckt 1 - Sag Study + Rebuild | 24 to 36 Months | $31,000,000 | AG2-444, AG2-548, AG2-665, AH1-669 |
|
| AEP | (Pending) / AEP-TC2-18679 | 05GAVIN 765.0 kV to 05MOUNTN 765.0 kV ckt 1 - Replace Equipement | 48 to 72 Months | $14,200,000 | AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18680 | 05MARYSV 765.0 kV to 05MARYSVL_RM 765.0 kV ckt Z1 - Replace Equipment | 24 to 36 Months | $2,200,000 | AG2-104, AG2-106, AG2-107, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18681 | 05E LIMA 345.0 kV to 05SW LIM 345.0 kV ckt 1 - Rebuild | 24 to 36 Months | $58,640,000 | AG2-149, AH1-539, AH1-690, AH1-711 |
|
| AEP | (Pending) / AEP-TC2-18682 | 05MALISX 138.0 kV to 05MALIS 138.0 kV ckt ZB - Replace equipment | 24 to 36 Months | $3,230,000 | AG2-104, AG2-106, AG2-107 |
|
| AEP | (Pending) / AEP-TC2-18683 | 05CLNCHR 138.0 kV to 05ABINGD 138.0 kV ckt 1 - Sag Study | 24 to 36 Months | $180,000 | AG2-184, AH1-227, AH1-617, AH1-644 |
|
| AEP | (Pending) / AEP-TC2-18685 | 05TECHDR 138.0 kV to 05M FUNK 138.0 kV ckt 1 - Sag Study | 36 to 48 Months | $190,000 | AG2-310, AG2-518, AH1-269 | AH1-144, AH1-145 |
| AEP | (Pending) / AEP-TC2-18686 | 05MADDOX 345.0 kV to 05E LIMA 345.0 kV ckt 1 - String the 2nd conductor | 24 to 36 Months | $48,000,000 | AG2-029, AG2-072, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18687 | 05HANGRCK_RJ 765.0 kV to 05HANG R 765.0 kV ckt Z1 - Replace Equipment | 30 to 36 Months | $500,000 | AG2-072, AG2-164, AG2-165, AG2-212, AG2-219, AG2-328, AG2-331, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18689 | AG1-410 TP 345.0 kV to 05MADDOX 345.0 kV ckt 1 - string the 2nd circuit | 24 to 36 Months | $7,250,000 | AG2-029, AG2-072, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-400, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18690 | 05SMYTH 138.0 kV to 05ATKINS 138.0 kV ckt 1 - Sag Study | 12 to 24 Months | $70,000 | AG2-360, AH1-133, AH1-721 | AH1-227 |
| AEP | (Pending) / AEP-TC2-18693 | Greentown 765 kV to Marysville 765 kV - Greenfield Line | 72 to 120 Months | $1,000,000,000 | AG2-029, AG2-072, AG2-164, AG2-165, AG2-212, AG2-219, AG2-328, AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18695 | 05CONSTP 138.0 kV to 05BEAVER CR1 138.0 kV ckt 1 - Sag study | 12 to 24 Months | $100,000 | AG2-184, AH1-617, AH1-644 |
|
| AEP | (Pending) / AEP-TC2-18699 | AG2-548 TP 138.0 kV to 05CORWIN 138.0 kV ckt 1 - Replace Equipment | 6 to 12 Months | $300,000 | AG2-548, AG2-665 |
|
| AEP | (Pending) / AEP-TC2-18700 | 05GUNN RD SW 345.0 kV to 05BOKESCRK 345.0 kV ckt 1- Rebuild | 24 to 36 Months | $66,000,000 | AG2-029, AH1-539, AH1-690, AH1-711 |
|
| AEP | (Pending) / AEP-TC2-18701 | AF2-205 TP 345.0 kV to 17REYNOLDS 345.0 kV ckt 1 - AEP end ratings | TBD | $0 | AH1-482 |
|
| AEP | (Pending) / AEP-TC2-18702 | 05SCOTSV 138.0 kV to AE1-108 POI 138.0 kV ckt 1 - Rebuild | 24 to 36 Months | $3,800,000 | AH1-690 | AG2-164, AG2-219 |
| AEP | (Pending) / AEP-TC2-18703 | 05HARBER 138.0 kV to 05SOFTSH 138.0 kV ckt 1 - Rebuild | 48 to 72 Months | $23,000,000 | AG2-184, AH1-617, AH1-644 |
|
| AEP | (Pending) / AEP-TC2-18704 | 05SMITHMTN 138.0 kV to 05LEESVI 138.0 kV ckt 1 - Rebuild | 36 to 48 Months | $32,000,000 | AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343 |
|
| AEP | (Pending) / AEP-TC2-18707 | 05ALLEN 345.0 kV to 05RPMONE 345.0 kV ckt 1 - Replace Equipment | 36 to 48 Months | $5,000,000 | AG2-029, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-400, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18708 | 05LEBANO 138.0 kV to 05ELKGARDNSS 138.0 kV ckt 1 - Replace Equipment | 24 to 36 Months | $1,500,000 | AG2-184, AH1-227, AH1-617, AH1-644, AH1-721 | AH1-535 |
| AEP | (Pending) / AEP-TC2-18709 | AG2-152 TP 138.0 kV to 05BANSTR 138.0 kV ckt 1 - Sag Study and Upgrade Equipment | 36 to 48 Months | $50,000 | AG2-152, AG2-311, AG2-541, AH1-343 |
|
| AEP | (Pending) / AEP-TC2-18711 | 05CLNCHR 138.0 kV to 05LEBANO 138.0 kV ckt 1 - Reconductor | 36 to 48 Months | $1,600,000 | AG2-184, AH1-227, AH1-617, AH1-644, AH1-721 |
|
| AEP | (Pending) / AEP-TC2-18712 | 05SOFTSH 138.0 kV to 05CONSTP 138.0 kV ckt 1 - Sag study | 6 to 12 Months | $50,000 | AG2-184, AH1-617, AH1-644 |
|
| AEP | (Pending) / AEP-TC2-18715 | 05MEADOW 345.0 kV to 17REYNOLDS 345.0 kV ckt 2 - Replace CBs | 18 to 24 Months | $2,000,000 | AG2-014, AG2-072, AG2-126, AG2-163, AG2-343, AG2-344, AG2-491, AG2-492 |
|
| AEP | (Pending) / AEP-TC2-18717 | 05BANSTR 138.0 kV to 05EDAN 2 138.0 kV ckt 1 - Sag Study and Replace Equipment | 36 to 48 Months | $1,700,000 | AG2-152, AG2-311, AG2-541, AH1-343 |
|
| AEP | (Pending) / AEP-TC2-18727 | 05CLYTR1 138.0 to 05SCHRIS 138 ckt 1 - Sag study | 24 to 36 Months | $360,000 | AG2-310, AG2-518, AH1-144, AH1-269 | AH1-145 |
| AEP | (Pending) / AEP-TC2-18729 | 05CORWIN 138kV – 05MILTON SS 138kV - Replace Equipment | 24 to 36 Months | $250,000 | AG2-548, AG2-665 |
|
| AEP | (Pending) / AEP-TC2-18730 | 05W.NEWTONSS 138kV – 05E LIMA 138kV - Rebuild | 36 to 48 Months | $19,500,000 | AH1-075, AH1-339, AH1-539 |
|
| AEP | (Pending) / AEP-TC2-18731 | 05WOLFCK 138kV to 05W.WATERT 138kV ckt 1 - Replace Equipment | 24 to 36 Months | $100,000 | AH1-690 | AG2-660, AH1-044, AH1-150, AH1-151 |
| AEP | (Pending) / AEP-TC2-18732 | 05RPMONE 345kV to AG1-410 TP 345kV ckt 1 - Replace Equipment | 36 to 48 Months | $4,500,000 | AG2-029, AG2-072, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-400, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| AEP | (Pending) / AEP-TC2-18733 | 05BOKESCRK 345kV to 05MARYSV 345kV ckt 1 - Reconductor | 48 to 52 Months | $6,810,000 | AG2-029, AH1-539, AH1-690, AH1-711 |
|
| AEP | (Pending) / AEP-TC2-18751 | 05KYGER 345kV to 05SPORN 345kV ckt 1 - Replace Equipment and Sag Study | 48 to 60 Months | $5,052,000 | AG2-072, AG2-164, AG2-219, AG2-363, AG2-364, AG2-660, AH1-044, AH1-055, AH1-150, AH1-151, AH1-537, AH1-721 |
|
| AEP | (Pending) / AEP-TC2-18798 | 05ELDERBERRY 345kV – 05DUMONT 345kV ckt 1 - Rebuild | 60 to 72 Months | $44,100,000 | AG2-245, AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391 |
|
| AEP | (Pending) / AEP-TC2-18819 | 06PIERCE 345kV to 05MARQUIS 345kV ckt 1 - Replace Equipment | 36 to 48 Months | $3,300,000 | AG2-072, AG2-164, AG2-219, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-537 |
|
| AEP | (Pending) / AEP-TC2-18821 | AEP Reinforcements for DEOK New Sub and New 345kV Line from Tanner's Creek | 72 to 84 Months | $6,700,000 | AG2-072, AG2-165, AG2-212, AG2-328 |
|
| AEP | (Pending) / AEPAPRJV002 | Perform sag study on 397 ACSR between Clifford and Boxwood (13.7 miles) | 24 to 36 Months | $82,200 | AH1-690 | AG2-164, AG2-219 |
| AEP | (Pending) / AEPAPRJV004 | Replace wavetrap @ New London | 18 to 24 Months | $260,000 | AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343 |
|
| AEP | (Pending) / AEPAPRJV006_2 | Sag Study 397 ACSR between James River and Soapstone ~10 miles | 24 to 36 Months | $60,000 | AH1-690 | AG2-164, AG2-219 |
| AEP | (Pending) / AEPI0020K | Replace Olive Riser Sub Cond 2874 ACSR (72/7) | 12 to 18 Months | $150,000 | AG2-163, AG2-245, AG2-363, AG2-364, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391, AH1-482 |
|
| AEP | (Pending) / AEPSERG03 | AF1-268 TP 138 KV to 05DESOTO 138 KV ckt 1 - Rebuild | 18 to 24 Months | $2,047,500 | AG2-550, AG2-551, AG2-637, AH1-308, AH1-337 |
|
| AEP | b3788.1 / B3788.1 | Replace limiting station elements at Kyger Creek | Nov 18 2027 |
| AG2-072, AG2-219, AG2-363, AG2-453, AH1-055, AH1-537, AH1-721 | |
| AEP | b3851.1 / B3851.1 | Rebuild Allen-RP Mone 345kV | Jun 01 2027 |
| AG2-029, AG2-163, AG2-363, AG2-400, AG2-453, AH1-670 | |
| AEP | b3878.1 | Upgrade 765 kV circuit breakers 'B' and 'B2' to 5000A 50kA breakers at Marysville Station | Jun 01 2029 |
| AG2-029, AG2-072, AG2-363, AG2-453, AH1-670 | |
| AEP | b3888.1 | Preform sag study and complete mitigations on the 138 kV line between East Leipsic and the AE2-072 tap (Lammer) to allow line's conductor to operate to its maximum operating temperature (MOT). | Jun 01 2029 |
| AH1-690, AH1-735 | |
| AEP | b4000.1 | Add two 765 kV breakers at Amos Substation to expand the breaker and a half scheme to accommodate the new Amos-Welton Spring 765 kV line (Projected ISD 6/1/2029) | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| AEP | b4000.207 | Leesville Station Upgrade 138 kV | Jun 01 2029 |
| AG2-152, AG2-311 | |
| AEP | b4000.210 | Rebuild 7 miles of Otter - Johnson Mountain 138 kV line. | Jun 01 2029 |
| AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343 | |
| AEP | b4000.211 | Rebuild 6.5 miles of Johnson Mountain - New London 138 kV line | Jun 01 2029 |
| AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343 | |
| AEP | n5613 / AEPA0014a | Rebuild 0.9 miles of the Otter - Alta Vista 138 kV line. | Nov 21 2027 |
| AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343 | |
| AEP | n5808 / N5808 | CON Upgrade_AEP: eliminate the Eugene stuck breaker contingency. (AMIL upgrade will not be required) | May 15 2026 |
| AG2-363, AH1-670 | |
| AEP | n5857 / N5857 | Rebuild / reconductor 10 miles of ACSR ~ 477 ~ 26/7 ~ HAWK- Conductor Section 1. | 24 to 36 Months | $19,552,000 | AH1-664, AH1-665, AH1-666, AH1-721 |
|
| AEP | n6263.2 / AEPO0015b | Replace 600 Amp Sw at Harrison | 18 to 24 Months |
| AG2-548, AG2-665, AH1-669 | |
| AEP | n6525.2 / AEPO0026d | Replace three Sub Cond 1590 AAC 61 Str at Fremont | 18 to 24 Months | $390,000 | AG2-515, AH1-690, AH1-711 |
|
| AEP | n6525.3 / AEPO0026f | Rebuild 7 miles of 138 kV line between Fremont Center and First Energy's We [...] fact that they own a portion of the line conductor that limits the branch. | 24 to 36 Months | $13,650,000 | AG2-515, AH1-690, AH1-711 |
|
| AEP | n6594.1 / AEPA0044a | Rebuild 8.4 miles section of the Leesville - Alta Vista 138 kV line | Nov 21 2027 |
| AG2-152, AG2-311 | |
| AEP | n6600 / AEPI0001a | Replace Dumont Circuit Breaker B1 | 18 to 24 Months | $3,900,000 | AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-543, AH1-714 |
|
| AEP | n7619.1 / AEPI0032a | Replace 3000A non oil Circuit Breaker at Dumont | 18 to 24 Months | $1,300,000 | AG2-245, AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391 |
|
| AEP | n7619.2 / AEPI0032b | Reconductor/Rebuild 14 miles of ACSR ~ 954 ~ 45/7 ~ RAIL Dumont - Elderberry 345kV line | 24 to 36 Months | $28,000,000 | AG2-245, AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-391 |
|
| AEP | n7683 | Rebuild/reconductor 3.05 mi. of the 1275 ACSR/PE 54/19 conductor with 2-954 ACSR 54/7 conductor size with a SN rating of 1410 MVA. | 24 to 36 Months | $18,460,000 | AG2-029, AG2-072, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-400, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| AEP | n7925.1 / AEPI0010a | Reconductor ~0.41 miles of the Sullivan – West Casey (Ameren) line | 11 Months | $1,216,000 |
| AG2-363 |
| AEP | n8383 | A sag study will be required on the 3.65 miles of ACSR ~ 397.5 ~ 30/7 ~ LARK~ Conductor to determine what mitigation | 24 to 36 Months | $78,000 | AH1-690 | AG2-164, AG2-219 |
| AEP | n8386 | A sag study will be required on the ~4.0 miles of ACSR ~ 397.5 ~ 30/7 ~ LARK~ Conductor to determine what mitigation | 24 to 36 Months | $78,000 | AH1-690 | AG2-164, AG2-219 |
| AEP | n9182.0 / AEPIMJMS01 | Rebuild Olive - AF2-359 345kV | 30 to 36 Months | $35,000,000 | AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-714 |
|
| AEP | n9243.0 / AEPSERG13 | Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles. | 55 Months | $200,238,000 |
| AG2-072 |
| AEP | n9669.0 / AEPO0027e | Replace Sub cond 397.5 ACSR 26/7 at Howard | 18 to 24 Months | $130,000 | AH1-690 |
|
| AEP | n9674.0 / AEPO0026b | Replace 1200 A Switch at Fremont | 18 to 24 Months | $260,000 | AG2-515, AH1-690, AH1-711 |
|
| AEP | n9675.0 / AEPO0035a | Sag Study will be required on ACSR ~ 954 ~ 45/7, 18.3 miles line between South Berwick and Galion . | 24 to 36 Months | $229,320 | AG2-149, AG2-329, AH1-690, AH1-711 |
|
| AEP | n9676.0 / AEPO0033a | Sag Study will be required on 19.2 miles line between Fostoria and Lallen [...] tudy : S/N: 1409MVA S/E: 1887MVA.Rebuild/Reconductor, cost : $ 38.4 million | 24 to 36 Months | $99,840 | AH1-690 |
|
| AEP | s2021.3 | Rebuild the ~38.5 mile Jay – Allen 138 kV line from Pennville to the juncture west of Allen station | Dec 20 2023 |
| AG2-550, AG2-551, AG2-637, AH1-308, AH1-337 | |
| AEP | s2213.9 / (Pending) | Six-wire 71.5 miles of the Pierce-Don Marquis line. Construct 0.13 miles of line to tie into Don Marquis station. | Jun 01 2027 |
| AG2-072, AG2-163, AG2-164, AG2-219, AG2-363, AH1-537 | |
| AEP | s2887.1 / s2887 | Construct a new brownfield, breaker and a half Glen Lyn station next to the existing station | Jun 01 2026 |
| AH1-144, AH1-145 | |
| AEP | s2887.4 | Extend the Glen Lyn – Morgans Cut and Glen Lyn – Hazel Hollow lines | Apr 03 2029 |
| AH1-144, AH1-145 | |
| AEP | s3148.1 | 05WHIPPLEDTC 345.0 kV to 05DESOTO 345.0 kV ckt 1 - s3148.1 | Jun 10 2027 |
| AG2-029 | |
| AEP | s3148.1 / s3148 | Reinforcement for AF1-118 TP 345 KV to 05SORENS 345 KV ckt 2 | Jun 10 2027 |
| AG2-519, AG2-550, AG2-637 | |
| APS | (Pending) / TC1-APS-002.c | Replace/Upgrade (3) 138 kV T-Line Drops at Armstrong | 13 Months | $591,863 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AH1-313 |
| APS | (Pending) / TC1-APS-002.d | Rebuild 11.6 miles of 556.5 ACSR of the Armstrong - Kittanning 138 kV line | 28 Months | $37,921,495 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AH1-313 |
| APS | (Pending) / TC1-PH1-004 | Rebuild ~21.7 miles on Back Fork-Crupperneck 138 kV Line | 38 Months | $68,463,650 | AG2-658, AH1-426, AH1-426A | AG2-657 |
| APS | (Pending) / TC1-PH1-005 | Bays - Wolf Run 138 kV line to be reconductored with 795 ACSR. | 19 Months | $17,295,451 | AG2-658, AH1-426, AH1-426A | AG2-657 |
| APS | (Pending) / TC1-PH1-010 | Reconductor Wolf Run - Sutton Tap 138 kV line | 19 Months | $15,074,673 | AG2-658, AH1-426, AH1-426A | AG2-657 |
| APS | (Pending) / TC1-PH1-011 | Reconductor Sutton Hill - Sutton Tap 138 kV, | 18 Months | $8,545,167 | AG2-658, AH1-426, AH1-426A |
|
| APS | (Pending) / TC1-PH1-014 | Replace WT at Shingletown substation. | 17 Months | $308,526 | AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC1-PH1-066 | Reconductor (Possible Rebuild) ~4.8 miles of Blairsville - Social Hall 138 kV line including (2) T-line drops at Social Hall. | 20 Months | $18,224,602 | AG2-411, AG2-456, AG2-457, AH1-102, AH1-203, AH1-268, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 | AH1-201, AH1-205 |
| APS | (Pending) / TC1-PH1-076 | Reconductor Butler - Karns City 138 kV line. | 30 Months | $51,840,579 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AG2-206, AG2-220, AG2-327, AG2-420, AH1-005 |
| APS | (Pending) / TC1-PH1-099 | Reconductor Sutton Hill - Heater 138 kV Line, Terminal upgrades at Sutton Hill | 26 Months | $26,282,083 | AG2-658, AH1-426, AH1-426A |
|
| APS | (Pending) / TC2-APS-001.a | Upgrade 138 kV Carlos DS A-18 | 21 Months | $432,791 | AG2-615 | AG2-448, AH1-203, AH1-340 |
| APS | (Pending) / TC2-APS-001.b | Upgrade Carlos 138 kV SCCIRs 556.5 ACSR 26/7 bus including risers | 15 Months | $426,600 | AG2-615 | AH1-203 |
| APS | (Pending) / TC2-APS-002.a | Upgrade Disc Switch at Beryl | 21 Months | $432,791 | AG2-505, AG2-582, AG2-615 | AG2-062, AH1-340 |
| APS | (Pending) / TC2-APS-002.b | Reconductor (Possible Rebuild) ~3.8 miles of AG2-505 - Beryl 138kV transmission line | 19 Months | $16,807,147 | AG2-505, AG2-582 | AH1-340 |
| APS | (Pending) / TC2-APS-003 | Reconductor (Possible Rebuild) ~1.9 miles of AG2-423 tap - Harmony Jct 138 kV transmission line | 18 Months | $6,784,869 | AG2-423, AG2-615 |
|
| APS | (Pending) / TC2-APS-004 | Reconductor (Possible Rebuild) ~2.2 miles of AF2-356 - Mt Zion 138 kV transmission line | 37 Months | $8,699,919 | AH1-340 |
|
| APS | (Pending) / TC2-APS-005 | Upgrade Wave Trap at Gilboa | 19 Months | $364,562 | AG2-657, AH1-426, AH1-426A |
|
| APS | (Pending) / TC2-APS-006 | Reconductor (Possible Rebuild) ~2.7 miles of Mechanicstown - Millville 138 kV line | 18 Months | $9,809,215 | AG2-288 |
|
| APS | (Pending) / TC2-APS-008.a | Replace substation conductor at Hampshire | 12 Months | $189,159 | AG2-615 |
|
| APS | (Pending) / TC2-APS-008.b | Reconductor Hampshire - Ridgeley 138 kV Line including a line drop at Hampshire and Line drops at Ridgeley | 47 Months | $92,496,484 | AG2-615 |
|
| APS | (Pending) / TC2-APS-009.a | Reconductor Pruntytown - Shinns Run 138kV line including line drops at Shinns Run | 26 Months | $36,786,038 | AG2-582 |
|
| APS | (Pending) / TC2-APS-009.b | Upgrade Meters at Pruntytown | 13 Months | $1,098,322 | AG2-582 |
|
| APS | (Pending) / TC2-APS-010 | Reconductor French Creek - Heaters 138kV transmission line | 47 Months | $94,637,673 | AG2-658, AH1-426, AH1-426A |
|
| APS | (Pending) / TC2-APS-011.a | Reconductor Glen Falls - Mcalpin transmission line. | 19 Months | $16,988,135 | AG2-582 |
|
| APS | (Pending) / TC2-APS-011.b | Replace Breaker Failure Relaying at Mcalpin | 18 Months | $509,895 | AG2-582 |
|
| APS | (Pending) / TC2-APS-012.a | Reconductor 556.5 ACSR 26/7-line exit at Bridgeport Hill | 14 Months | $977,534 | AG2-582 |
|
| APS | (Pending) / TC2-APS-012.b | Reconductor Bridgeport Hill - Glen Falls transmission line | 19 Months | $16,031,404 | AG2-582 |
|
| APS | (Pending) / TC2-APS-012.c | Upgrade/Replace (3) 10 Amp Bitronics Meters at Glen Falls | 12 Months | $157,861 | AG2-582 |
|
| APS | (Pending) / TC2-APS-012.d | Replace SEL-321 impedance relay and 1200 CT at Glen Falls | 17 Months | $396,495 | AG2-582 |
|
| APS | (Pending) / TC2-APS-013 | Upgrade 138 kV Bus Risers at Garrett | 12 Months | $263,169 | AG2-411, AH1-201, AH1-203, AH1-205, AH1-460, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-APS-015.a | Replace 500/138 kV TR2 at Flint Run | 66 Months | $28,558,871 | AG2-582 |
|
| APS | (Pending) / TC2-APS-015.b | Replace 6 138 kV Disc Switches and 5 Breaker Leads at Flint Run | 24 Months | $1,826,164 | AG2-582 |
|
| APS | (Pending) / TC2-APS-016.a | Replace 500/138 kV TR1 at Flint Run | 66 Months | $28,558,871 | AG2-582 |
|
| APS | (Pending) / TC2-APS-016.b | Replace 6 138 kV Disc Switches and 5 Breaker Leads at Flint Run | 24 Months | $1,826,164 | AG2-582 |
|
| APS | (Pending) / TC2-APS-016.c | Replace SCCIR 3" Pipe A-frame closest to Disc SW A-39 | 18 Months | $597,737 | AG2-582 |
|
| APS | (Pending) / TC2-APS-017 | Reconductor (Possible Rebuild) ~5.9 miles of Elko - Carbon Center Jct 138 kV transmission line including (2) T-Line Drops at Elko | 21 Months | $20,614,554 | AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-APS-018 | Reconductor (Possible Rebuild) ~1.18 miles of Loyalhanna - Edgewater transmission line including (3) T-line Drops at Loyalhanna | 19 Months | $5,581,666 | AH1-102, AH1-140, AH1-268, AH1-588, AH1-589 | AG2-411, AH1-201, AH1-203, AH1-205, AH1-460 |
| APS | (Pending) / TC2-APS-019.a | Reconductor (Possible Rebuild) 8.6 miles of Black Oak - Cross School transmission line | 41 Months | $31,323,166 | AG2-448, AG2-505, AG2-615 | AG2-062 |
| APS | (Pending) / TC2-APS-019.b | Upgrade/Update (3) 8 amp KC-4 (50FD) Relay at Black Oak | 19 Months | $882,439 | AG2-448, AG2-505 |
|
| APS | (Pending) / TC2-APS-020.a | Replace Bus Risers at Shingletown substation | 13 Months | $591,863 | AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-APS-020.b | Reconductor (Possible Rebuild) ~19.4 miles of Shawville-Shingletown 230kV transmission line. [WPP side] | 69 Months | $100,349,391 | AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-APS-021 | Replace 138 kV Disc Switch at Carlos Jct T | 19 Months | $432,790 | AG2-615, AH1-203 | AG2-411, AG2-448, AH1-201, AH1-205, AH1-340, AH1-460 |
| APS | (Pending) / TC2-APS-023.b | Reconductor (Possible Rebuild) ~1 mile of Beryl - Cross School 138 kV transmission line. | 18 Months | $4,427,958 | AG2-448, AG2-505, AG2-582 | AH1-340 |
| APS | (Pending) / TC2-APS-026.a | Replace (4) 10 Amp Meters & (3) 10 Amp Relays at Kittanning | 20 Months | $1,254,982 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AH1-313 |
| APS | (Pending) / TC2-APS-026.b | Replace WHSE 1200 Amp Wave Trap at Armstrong | 18 Months | $364,562 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AH1-313 |
| APS | (Pending) / TC2-APS-027 | Upgrade/Replace 138 kV West Bus + Risers at Powell Mt. | 12 Months | $645,868 | AG2-657, AH1-426, AH1-426A |
|
| APS | (Pending) / TC2-APS-028 | Reconductor Mt Zion - AG2-505 138kV transmission line | 18 Months | $12,297,524 | AG2-582, AG2-615 | AG2-062, AH1-340 |
| APS | (Pending) / TC2-APS-029 | Reconductor (Possible Rebuild) ~3.4 mile of Barnetts Run - Bridgeport Hill 138 kV transmission line. Including Wave trap drop and transmission line drop at Barnetts Run | 20 Months | $13,223,334 | AG2-582 |
|
| APS | (Pending) / TC2-APS-031.a | Upgrade (2) 138 kV Breaker Leads at Karns City | 13 Months | $183,598 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-APS-031.b | Replace 138 kV T-line drops at Karns City | 13 Months | $579,701 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-APS-032.a | Upgrade/Replace Wave Trap at Pickens | 17 Months | $364,562 | AG2-658, AH1-426, AH1-426A | AG2-657 |
| APS | (Pending) / TC2-APS-032.b | Reconductor (possible rebuild) ~16.5miles Back Fork - Pickens 138 kV | 38 Months | $55,447,998 | AG2-658, AH1-426, AH1-426A | AG2-657 |
| APS | (Pending) / TC2-APS-032.c | Upgrade/Replace shared node at Back Fork | 12 Months | $263,169 | AG2-658, AH1-426, AH1-426A | AG2-657 |
| APS | (Pending) / TC2-APS-033 | Reconductor Cherry Run - Morgan 138 kV transmission line | 47 Months | $92,496,484 | AG2-615 |
|
| APS | (Pending) / TC2-APS-034.a | Replace Bus Riser and Bus Side Disc Leads at Shingletown | 13 Months | $427,516 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-APS-034.b | Replace Bus Riser at Shingletown | 12 Months | $263,169 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-APS-034.c | Reconductor Shingletown - Lewistown 230kV line including T-line drop at Shingletown | 55 Months | $73,419,183 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-APS-034.d | Replace Disc Switches at Shingletown | 22 Months | $711,556 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-APS-034.e | Replace Current Transformers at Shingletown | 22 Months | $1,563,362 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-APS-034.f | Replace Breaker Leads at Shingletown | 12 Months | $214,619 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-APS-034.g | Replace/Update SEL-421 Relay at Shingletown | 18 Months | $509,895 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-APS-034.h | Replace/Update SEL-421 Relay at Shingletown | 18 Months | $509,895 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-APS-034.i | Replace Circuit Breaker at Shingletown | 45 Months | $1,621,562 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-APS-036.a | Upgrade/Replace (6) 138kV Substation Conductors [(2) ACSR 954 45/7 & (4) AAC 1000 37] | 15 Months | $1,084,903 | AG2-176, AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-APS-036.b | Upgrade 345/138 kV #2 Transformer at Armstrong | 65 Months | $13,326,308 | AG2-176, AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-APS-036.c | Update/Replace 138 kV SEL-311B Relay | 18 Months | $509,895 | AG2-176, AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-APS-036.d | Upgrade/Replace (4) 138 kV SPS AL 3.00 PIPE Substation Conductors | 14 Months | $193,266 | AG2-176, AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | (Pending) / TC2-PH1-019.c | Upgrade SEL-321 (21/67NP-BLACK OAK) relay at Cross School | 18 Months | $509,895 | AG2-448, AG2-505 |
|
| APS | (Pending) / TC2-PH1-019.d | Upgrade/Update 2 relays at Black Oak (KD-11 Zone 3 & KD-10 Zone 2) | 18 Months | $509,895 | AG2-448, AG2-505 |
|
| APS | (Pending) / TC2-PH1-023.a | Upgrade 138 kV Disc Sw 1306_Q at Beryl | 19 Months | $432,790 | AG2-448, AG2-505, AG2-582, AG2-615 | AG2-062, AH1-340 |
| APS | (Pending) / TC2-PH1-025 | Reconductor (Possible Rebuild) ~2 miles of Barnetts Run-Shinns Run 138kV line including T-line drops at Barnetts Run & Shinns Run | 18 Months | $8,443,469 | AG2-582 |
|
| APS | (Pending) / TC2-PN-002.a | Reconductor Shingletown - Lewistown 230kV line [PN Side] | 49 Months | $58,911,069 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / TC2-PN-002.b | Replace/Update SEL-421 Relays at Lewistown | 12 Months | $176,953 | AG2-176, AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 |
|
| APS | (Pending) / WP-AF1-F-0001 | Replace Wave Trap at Keystone | 19 Months | $364,562 | AG2-347, AH1-634, AH1-695, AH1-710, AH1-734 |
|
| APS | (Pending) / WP-AF2-F-0010 | Reconductor 5.1 miles of Edgewater Tap - Vasco Tap 138 kV line | 21 Months | $19,555,226 | AH1-102, AH1-140, AH1-268, AH1-588, AH1-589 | AH1-201, AH1-203, AH1-205, AH1-460 |
| APS | b4000.10 | Install four 250 MVAR cap banks (two on 765 and two on 500 kV side) and a +/-500 MVAR STATCOM on the 765 kV Rocky Point yard | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| APS | b4000.11 | Expand Black Oak Substation & Loop in the 502 Jct-Woodside 500 kV line (Projected ISD 6/1/2029) | Jun 01 2029 |
| AG2-062, AG2-072, AG2-347, AG2-360, AG2-448, AG2-582, AG2-615, AH1-695, AH1-721 | |
| APS | b4000.2 | Construct a new 175 miles Amos to Welton Spring 765 kV line - AEP Section of the line is 30 miles (Projected ISD 6/1/2029) | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| APS | b4000.3 | Construct a new 175 miles Amos to Welton Spring 765 kV line - APS/FE Section of the line is 145 miles (Projected ISD 6/1/2029) | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| APS | b4000.4 | Construct a new 765 kV switchyard - Welton Spring (Projected ISD 6/1/2029) | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| APS | b4000.5 | Install four 250 MVAR shunt capacitors, and a +/-500 MVAR STATCOM at Welton Spring 765 kV substation | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| APS | b4000.6 | Construct a new 86 miles Welton Spring to Rocky Point 765 kV line (Welton Spring to DVP local area, roughly 21 miles) (VA Portion) | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| APS | b4000.7 | Construct a new 86 miles Welton Spring to Rocky Point 765 kV line - in DVP local area/Millville to Lovettsville section, roughly 10.5 miles (Projected ISD 6/1/2029) | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| APS | b4000.8 | Construct a new 86 miles Welton Spring to Rocky Point 765 kV line (DVP local area to Rocky Point, roughly 4.8 miles) | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| APS | b4000.9 | Construct a new substation called Rocky Point with a 765 kV and a 500 kV yard (Projected ISD 6/1/2029) | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-582, AH1-695, AH1-721 | |
| APS | n6183 | Rebuild 10.4 miles of 4/0 CU from Columbia Big Pine - Garretts Run Jct 138 kV (99 spans). | 26 Months | $36,946,687 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AH1-005, AH1-313 |
| APS | n7164.1 | Reconductor (Possible Rebuild) ~7.5 miles of the Karns City to Kissinger Jct 138kV line | 23 Months | $26,275,973 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | n7165.1 | Replace T-line drops at All Dam 6 | 12 Months | $427,516 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | n7165.2 | Reconductor All Dam 6 - Kittanning 138kV line | 22 Months | $21,034,523 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | n7166.1 | Replace 4/0 CU line exit at All Dam 6 Tap. | 18 Months | $922,908 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | n7166.2 | Reconductor 7.6 miles of 4/0 CU from All Dam 6 Tap to structure 84 (66 spans) | 23 Months | $26,284,067 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| APS | n7171.1 | Rebuild approximately 4.0 miles of 4/0 CU on the Kiski Valley to Columbia Big Pine 138kV line. | 20 Months | $15,258,720 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AH1-005, AH1-313 |
| APS | n7191.1 | Reconductor the Garrett - Garrett Tap 115 kV Line (~2.0 miles) | 37 Months | $7,972,991 | AG2-411, AH1-201, AH1-203, AH1-205, AH1-460, AH1-588, AH1-589 |
|
| APS | n7518 | Reconductor (Possible Rebuild) ~4.6 miles of Crupperneck-Grassy Falls 138kV line including T-Line drops at Crupperneck | 19 Months | $17,251,304 | AH1-426, AH1-426A | AG2-657 |
| APS | n9160.0 / TC1-PH1-077 | Reconductor Powell Mountain - Bays 138 kV Line | 31 Months | $38,094,411 | AG2-658, AH1-426, AH1-426A | AG2-657 |
| APS | n9240.0 / TC1-APS-002.a | Replace GE 800 Amp Wave Trap at Kittanning | 17 Months | $364,562 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AG2-206, AG2-220, AG2-327, AH1-005, AH1-313 |
| APS | n9241.0 / TC1-APS-002.b | Replace 8 Amp ITH(50FD) relay at Kittanning | 18 Months | $509,895 | AG2-176, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-158, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AG2-206, AG2-220, AG2-327, AH1-005, AH1-313 |
| APS | s3191.1 / APS-2023-056 | Harrison – Pruntytown 500 kV Misoperation Relays (Projected ISD by end of 2025) | Dec 31 2024 |
| AG2-582 | |
| APS | s3475.1 / APS-2024-024 | At Ridgeley, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying (Projected ISD 10/31/2027) | Oct 31 2027 |
| AG2-615 | |
| APS | s3483.1 / APS-2023-021 | Convert Milesburg Substation into a four-breaker 230 kV ring bus (Projected ISD 12/17/2027) | Dec 17 2027 |
| AG2-456, AG2-457, AH1-313, AH1-587, AH1-588, AH1-589 | |
| APS | s3493.1 / APS-2024-051 | Terminal Equipment Upgrades at Crupperneck, Cowen, and Back Fork 138kV substations (Projected ISD 6/30/2027) | Jul 30 2027 |
| AG2-657, AG2-658, AH1-426, AH1-426A | |
| APS | s3712.1 / APS-2024-047 | Terminal Equipment Upgrades at Morgan & Cherry Run - Misoperation Relay Project (Projected ISD 7/21/2029) | Jul 21 2029 |
| AG2-448, AG2-615 | |
| APS | s3713.1 / APS-2025-018 | Terminal Equipment Upgrades at Black Oak & Cross School - Misoperation Relay Project (Supplemental - Projected ISD 12/31/2026) | Dec 31 2026 |
| AG2-062, AG2-448, AG2-505, AG2-615, AH1-340 | |
| ATSI | (Pending) / TC2-ATSI-001 | Reconductor (possible rebuild) 1.98 miles of 795 ACSR 36/1 transmission line and 795 ACSR 36/1 line drops on the Avon-Astor T11 Ckt Q11 138 kV line | 18 Months | $7,382,665 | AH1-690 |
|
| ATSI | (Pending) / TC2-ATSI-002.a | Upgrade (4) 1024.5 ACAR 24/13 sub conductors at Davis Besse | 14 Months | $1,099,401 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.b | Upgrade (3) 345kV bus and line side disconnect switches at Davis Besse substation at Davis Besse | 37 Months | $1,324,127 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.c | Upgrade 345kV 1033.5 AAC 61 sub conductors at Davis Besse substation at Davis Besse | 13 Months | $257,762 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.d | Reconductor (possible rebuild) 345kV 20.75 miles of transmission line and line drops at both remote ends | 71 Months | $121,594,776 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.e | Upgrade 345kV 3500 SAC 127 sub conductor at Davis Besse | 13 Months | $257,762 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.f | Upgrade (2) 345kV Wave Traps at Bayshore and (2) at Davis Besse | 22 Months | $1,215,694 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.g | Upgrade (2) 345kV circuit breakers at Bayshore and (2) at Davis Besse | 60 Months | $7,786,806 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.h | Upgrade (8) 1590 AAC 61 sub conductor at BAYSHORE | 13 Months | $211,119 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.i | Upgrade B34544 CT at BAYSHORE | 20 Months | $712,356 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.j | Upgrade (1) 1590 ACSR 45/7 sub conductor at Davis Besse | 13 Months | $393,871 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.k | Upgrade the B34545 and 34562 (4) Meter and (2) Relay Thermals at Bayshore and Davis Besse | 19 Months | $998,835 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-363, AG2-364, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.l | Upgrade (5) 4.00 SPS AL PIPE 61 sub conductors at BAYSHORE on the Bayshore - Davis Besse 345kV line | 14 Months | $246,545 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-002.m | Upgrade (7) 3000A disconnect switches (D34545:N,S, D3454:W,E, A34673, D34561C, and 34623)and (2) B34545 impedance relays at Bayshore and Davis Besse | 42 Months | $3,544,138 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-003 | Reconductor (possible rebuild) 12.19 miles of transmission line on the Beaver- Johnson Ckt 1 138kV | 27 Months | $42,140,488 | AH1-690 |
|
| ATSI | (Pending) / TC2-ATSI-004.a | Upgrade D120 and D125 disconnect switches at Beaver substation | 22 Months | $929,516 | AG2-149, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-004.b | Upgrade (1) 3000 SAC 169 line drop at Beaver | 12 Months | $263,169 | AG2-149, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-004.c | Reconductor (possible rebuild) 18.22 miles of 954 ACSR 48/7 transmission line and (3) line drops at Beaver on the Beaver - Carlisle Ckt 1 345 kV | 63 Months | $109,211,408 | AG2-149, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-004.d | Upgrade (1) 3500 SAC 127 D120-to-B121 breaker lead at Beaver | 12 Months | $265,209 | AG2-149, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-005.a | Upgrade (3) disconnect switches at Beaver (D:120,166,165) | 37 Months | $1,350,788 | AG2-149, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-005.b | Upgrade (4) 954 ACSR 45/7 overhead line and line drops at Beaver Substation | 15 Months | $809,465 | AG2-149, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-005.d | Reconductor (possible rebuild) 8.37 miles of 954 ACSR 48/7 transmission line on the Beaver - Lake Avenue Ckt 1 345 kV | 38 Months | $50,053,445 | AG2-149, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-005c | Upgrade 3500 SAC 127 B161 (2) breaker leads and (1) B121-to-D120 breaker lead at Beaver | 11 Months | $191,109 | AG2-149, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.a | Reconductor (possible rebuild) 30.25 miles of 954 ACSR 48/7 transmission line and line drops (line drops at Davis Besse) on the Davis Besse-Hayes 345 kV line | 90 Months | $179,916,169 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.b | Upgrade 3500 SAC 127 OVERHEAD PIPE to disc sw. 34625 at Davis Besse and B18 breaker leads at Hayes | 18 Months | $284,061 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.c | Upgrade (2) Wave Traps at Davis Besse and (2) Wave Traps at Hayes | 20 Months | $1,215,695 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.d | Upgrade (2) B18 & B12 345 kV Ciruit Breakers at Hayes | 56 Months | $3,893,404 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.e | Upgrade (2) B12 and B18 CTs at Hayes | 21 Months | $1,258,596 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.f | Upgrade (10) 1590 ACSR sub conductor (B66 and B67 breaker leads, wave trap subconductor, Overheadline-34625) at Davis Besse and B12 breaker leads at Hayes | 18 Months | $305,149 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.g | Upgrade B66 and B67 circuit breakers at Davis Besse substation | 56 Months | $3,893,404 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.h | Upgrade B66 (1) meter and (1) relay thermals and B67 (1) meter thermal at Davis Besse substation | 19 Months | $852,462 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.i | Upgrade (2) 9.6 Ohms impedance relays at Hayes and (2) 12.9 Ohms impedance relays at Davis Besse | 19 Months | $1,019,790 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.j | Upgrade (6) disconnect switches at Davis Besse (D27,28,29,30,34625,37) and (5) disconnect switches at Hayes (D20,19,16,13,14) | 31 Months | $4,525,814 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-006.k | Upgrade (1) 1590 AACSR Phase A/C line drop at Davis Besse substation and (3) Phase 3 "B-B", Phase 1&2 "C-C", and shared node to wave trap line drops at Hayes | 18 Months | $855,032 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.a | Upgrade D41 and D42 disconnect switches at Davis Besse | 36 Months | $967,716 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.b | Upgrade (1) 1024 ACAR 6E550-52-1 "A" line drop at Davis Besse | 12 Months | $263,169 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.c | Reconductor (possible rebuild) 15.6 miles of 954 ACSR 45/7 on the Davis Besse - AC2-103 Tap 345 kV line | 57 Months | $91,775,258 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.d | Upgrade (2) 3500 SAC 127 line drops at Davis Besse | 12 Months | $263,169 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.e | Upgrade 3500 SAC B65 breaker leads and subconductor (D42 to wave trap) at Davis Besse | 13 Months | $197,592 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.f | Reconductor (possible rebuild) 18.7 miles of 954 ACSR 48/7 on the Davis Besse - AC2-103 TAP 345kV | 64 Months | $111,822,087 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.g | Upgrade (2) Wave Traps at Davis Besse | 20 Months | $620,599 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.h | Upgrade Circuit Breaker 34564 at Davis Besse | 54 Months | $2,068,856 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.i | Upgrade (4) 1590 ACSR 45/7 sub conductors at Davis Besse | 13 Months | $756,208 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.j | Upgrade (2) 13.03 Ohm B65 Impedance Relays at Davis Besse | 18 Months | $509,895 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.k | Upgrade (2) 6.65 Ohm B65 Impedance Relays at Davis Besse | 18 Months | $509,895 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.l | Upgrade Circuit Breaker B65 at Davis Besse | 54 Months | $2,068,856 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-008.m | Upgrade (2) B65 Meter Thermals at Davis Besse | 18 Months | $509,895 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-010 | Upgrade 4/0 CU sub conductor at FOWLES substation | 13 Months | $591,862 | AH1-690 |
|
| ATSI | (Pending) / TC2-ATSI-014.a | Reconductor (possible rebuild) 29.61 miles of transmission line and line drops ( line drops at Hayes) on the Beaver - Hayes Ckt 1 345 kV line | 90 Months | $175,902,477 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.b | Upgrade 3500 SAC (2) B3 and (2) B6 breaker leads at Hayes | 18 Months | $152,573 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.c | Upgrade (2) L3000 wavetraps at Beaver and Hayes | 18 Months | $729,124 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.d | Upgrade (4) circuit breakers at Beaver and Hayes (B88, B115, B3, B6) | 60 Months | $7,937,520 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.e | Upgrade the 1590 AAC (2) B88 and (2) B15 breaker leads at Beaver | 18 Months | $152,573 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.f | Upgrade the B6 CT at Hayes | 20 Months | $727,300 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.g | Upgrade (3) 1590 AAC line drops at Beaver (line drop to WT, Phase 1&3 "B-B", and SHARED NODE TO: WT, PH 2 / 5" AL, PH 1&3) | 18 Months | $591,863 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.h | Upgrade the B88 and B115 CTs at Beaver | 21 Months | $1,258,596 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.i | Upgrade the 10A B115 relay and B88 meter thermal at Beaver | 18 Months | $509,895 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.j | Upgrade the B88 and B3 impedance relays at Beaver and Hayes | 19 Months | $1,019,790 | AG2-149, AG2-165, AG2-212, AG2-328, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-014.k | Upgrade (9) 3000A disconnect switches at Beaver and Hayes (D:74,92,93,116,4,5,7,8,11) | 29 Months | $3,774,791 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-015.a | Reconductor (possible rebuild) 21.68 miles of transmission line and (1) line drop (line drop at Lemoyne) on the Davis Besse - Lemoyne 345 kV | 73 Months | $126,131,949 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-015.b | Upgrade (4) L300 wavetraps at Davis Besse and Lemoyne | 22 Months | $1,132,675 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AG2-660, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-015.c | Upgrade (2) 3000A CBs at Davis Besse and (1) 3000A CB at Lemoyne | 56 Months | $5,962,261 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-015.d | Upgrade (12) dual 1590 ACSR SCCIR at Davis Besse and Lemoyne | 12 Months | $2,070,983 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-015.e | Upgrade (2) 8.6 Ohm impedance relays at Davis Besse and (2) 7.8 Ohm impedance relays at Lemoyne | 18 Months | $1,019,790 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-015.f | Upgrade the B34502 CB at Lemoyne | 54 Months | $2,068,856 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-015.g | Upgrade (2) B34501 and B34502 relay thermals at Lemoyne and (3) 34563 relay and meter thermals at Davis Besse | 20 Months | $2,137,421 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-015.h | Upgrade (12) 4.00 SPS.AL PIPE at Lemoyne | 22 Months | $961,300 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-015.i | Upgrade (10) 3000A bus and line side disconnect switches at Davis Besse and Lemoyne (34624, A34604, D345:63A,63B,64D,64C,01N,01S,02W,02E) | 29 Months | $3,952,709 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-016.a | Upgrade (1) line drop into Lakeview and (1) line drop into Ottawa | 13 Months | $526,339 | AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-016.b | Upgrade the standalone CT at Ottawa | 20 Months | $672,402 | AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-016.c | Reconductor (possible rebuild) 10.46 miles of transmission line on the Ottawa-Lakeview 138 kV Q-121 line | 25 Months | $38,463,247 | AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-016.d | Upgrade 795 ACSR B6 and B145 breaker leads and shared and (2) shared node subconductors at Lakeview | 13 Months | $337,294 | AG2-515, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-017 | Upgrade (2) 2000A bus and line side disconnect switches at Bayshore | 36 Months | $948,616 | AH1-690 |
|
| ATSI | (Pending) / TC2-ATSI-019 | Upgrade phase 2 wave trap at Galion | 18 Months | $620,599 | AG2-149, AG2-329, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.a | Upgrade B185 and B182 circuit breakers at Beaver | 56 Months | $3,893,404 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.b | Upgrade (4) disconnect switches at Beaver (D186,184,181,183) | 25 Months | $1,699,640 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.c | Upgrade 3000 AAC B185 and B185 breaker leads at Beaver | 13 Months | $187,449 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.d | Reconductor (possible rebuild) 29.61 miles of transmission line and (4) line drops beginning at Beaver towards Davis Besse on the Beaver - Davis Besse Ckt 1 345 kV line | 82 Months | $149,403,319 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.e | Upgrade (2) L3000 wavetraps at Beaver | 18 Months | $620,600 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.f | Upgrade (2) B182 impedance relays at Beaver (SEL-321: Z2-BU & Z2-PR) | 19 Months | $509,895 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.g | Upgrade (2) B185 and B182 revenue meter CTs at Beaver | 21 Months | $1,258,596 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.h | Upgrade the B185 CT to PVD at Beaver | 17 Months | $349,952 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.i | Upgrade B182 relay thermal at Beaver | 19 Months | $509,895 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-020.j | Upgrade (2) B182 impedance relays at Beaver (SEL-321: Z4-BU & Z4-PR) | 19 Months | $509,895 | AG2-029, AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.a | Upgrade (4) circuit breakers at Beaver and Lake Ave (B:3,4,216,219) | 56 Months | $7,786,809 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.b | Upgrade 1590 AAC B3, B4, B216 and B219 breaker leads at Beaver and Lake Ave | 12 Months | $305,540 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.c | Upgrade the (3) B216, B219 and B4 1500 CTs | 16 Months | $853,850 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.d | Upgrade (3) 1590 line drops at Beaver and Lake Ave | 12 Months | $690,685 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.e | Upgrade the (1) B219 1200 CT to PVD at Beaver | 16 Months | $349,952 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.f | Upgrade the (1) B216 relay thermal at Beaver | 18 Months | $509,895 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.g | Upgrade (1) 4.00 SPS.AL PIPE at Beaver | 12 Months | $178,089 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.h | Upgrade (9) disconnect switches at Beaver and Lake Ave (D: 19,20,21,22, 212,215,217,218,220) | 39 Months | $3,850,794 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.i | Upgrade the (2) B3 SEL411L impedance relays at Lake Ave | 18 Months | $509,895 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.j | Upgrade (2) 2.50 SPS.AL PIPE SCCIR at Beaver | 12 Months | $173,391 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.k | Upgrade the (15) B216, B219, B3 and B4 2000 CTs at Beaver and Lake Ave | 17 Months | $2,701,212 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.l | Upgrade the (2) B216 SEL411L impedance relays at Lake Ave | 18 Months | $509,895 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-021.m | Upgrade (8) 5.00 SPS.AL PIPE SCCIR at Beaver | 12 Months | $250,039 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | (Pending) / TC2-ATSI-023.a | Upgrade (2) line drop strands, one into Greenfield and one into Lakeview | 12 Months | $526,339 | AG2-515, AH1-690, AH1-711 | AG2-660, AH1-044, AH1-150, AH1-151 |
| ATSI | (Pending) / TC2-ATSI.023.b | Upgrade the B242 relay thermal | 18 Months | $509,895 | AG2-515, AH1-690, AH1-711 | AG2-660, AH1-044, AH1-150, AH1-151 |
| ATSI | (Pending) / TC2-ATSI.023.c | Upgrade the (2) B96 and (2) B7 breaker leads at Lakeview and the (1) B242 to D241 lead at Greenfield | 13 Months | $218,931 | AG2-515, AH1-690, AH1-711 | AG2-660, AH1-044, AH1-150, AH1-151 |
| ATSI | b3033 | Ottawa-Lakeview 138 kV Reconductor and Substation Upgrades | Oct 31 2025 |
| AG2-515, AH1-690, AH1-711 | |
| ATSI | b3925.1 | Rebuild the 7.46 miles of Avery - Shinrock 138 kV Line with 795 kcmil 26/7 ACSS (7.46 miles) | Dec 10 2027 |
| AH1-690 | |
| ATSI | b3925.2 | Rebuild the 13.45 miles of Greenfield - Lakeview 138 kV Line from 2 x 336.4 kcmil 26/7 ACSR to 1 x 795 kcmil 26/7 ACSS | Jun 01 2029 |
| AG2-289, AG2-290, AG2-515, AH1-044, AH1-150, AH1-151, AH1-690, AH1-711 | |
| ATSI | b3925.3 | Rebuild the 6.5 miles of Avery-Hayes 138 kV Line with 795 kcmil 26/7 ACSS conductor | Jun 01 2027 |
| AH1-690 | |
| ATSI | b3925.4 | Rebuild the Greenfield - Beaver 138 kV corridor (32 miles) with 795 kcmil 26/7 ACSS | Jun 01 2029 |
| AH1-690, AH1-711 | |
| ATSI | n6511 | Reconductor the 0.8 miles of transmission line between West Fremont-Fremont [...] section of limiting conductor and provide estimates for their replacement. | 17 Months | $4,238,484 | AG2-515, AH1-690, AH1-711 |
|
| ATSI | n9227.0 / TC1-ATSI-001.b | Upgrade T-line drops, overhead substation conductor and TL reconductor | 37 Months | $48,873,856 | AG2-149, AG2-165, AG2-212, AG2-328, AH1-690, AH1-711 |
|
| ATSI | n9228.0 / TC1-ATSI-002.b | Rebuild 6.6 miles of the Lallendorf-Monroe 345 kV line and install OPGW. Replace line drops and wave traps at Lallendorf. | 29 Months | $38,362,639 |
| AH1-272 |
| ATSI | n9322.0 / TE-AG1-S-0012a | Replace Four (4) disconnect switches, four (4) breaker leads, and one (1) meter, and reconductor two (2) transmission line drops on the Morocco 345 kV line terminal at Allen Junction. | 38 Months | $1,408,997 |
| AH1-272 |
| ATSI | s3360.1 | Galion 138kV Upgrades | Jun 01 2027 |
| AG2-149, AG2-329, AH1-282, AH1-690 | |
| ATSI | s3469.1 / ATSI-2024-024 | Rebuild the double circuit Galion – Roberts North 138 kV Line and Galion – Roberts South 138 kV Line | Aug 27 2026 |
| AG2-119, AG2-149, AG2-329, AH1-282, AH1-690 | |
| BGE | b3780.13 | Batavia Road to Riverside 230 kV reconductor | Dec 31 2027 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3780.4 | Peach Bottom to Graceton (BGE Portion) – New 500kV Line | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3780.5 | Build Solley Road substation + Statcom (Projected ISD 12/31/2028) | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3780.6 | Build Granite substation + Statcom (Projected ISD 12/31/2028) | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3780.7 | Build new Batavia Road substation (Projected ISD 12/31/2028) | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3780.8 | Graceton 500 kV substation expansion (Projected ISD 12/31/2028) | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3780.9 | Graceton to Batavia Road 230 kV double circuit pole line (Projected ISD 12/31/2028) | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.26 | Build High Ridge 500 kV substation - Three bay breaker and half configuration (Projected ISD 12/31/2030) | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.27 | High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) - Waugh Chapel side (Projected ISD 12/31/2030) | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.28 | High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) -Brighton side (Projected ISD 12/31/2030) | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.29 | High Ridge termination for the North Delta-High Ridge 500 kV line (Projected ISD 12/31/2030) | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.30 | High Ridge - Install two 500/230 kV transformers (Projected ISD 12/31/2030) | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.32 | Build new North Delta-High Ridge 500 kV line - BGE Portion (Projected ISD 12/31/2030) | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.33 | Replace terminal equipment limitations at Brighton 500 kV - on the existing Brighton-Waugh Chapel 500 kV (5053) or new Brighton-High Ridge 500 kV. | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.34 | Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV and cut into North Delta 500kV (Projected ISD 12/31/2030) | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.36 | Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV (Projected ISD 12/31/2030) | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.37 | Replace terminal equipment limitations at Conastone 500 kV - on the (existing Peach Bottom-Conastone) or (new Graceton-Conastone) 500 kV line (Projected ISD 12/31/2030) | Dec 31 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| BGE | b3800.41 | Conastone-Brighton 500 kV (5011 circuit) - Replace terminal equipment limitations at Conastone 500 kV. | Dec 31 2030 |
| AG2-347, AH1-695, AH1-710, AH1-725 | |
| ComEd | (Pending) / CE_NUN_COLLINS_TR | Collins Station 23 New Transformer | 24 to 30 Months | $15,600,000 | AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-543 |
|
| ComEd | (Pending) / CE_NUN_L0627.3 | TC2 Network Upgrade L0627 | 24 to 30 Months | $30,800,000 | AG2-660, AH1-044, AH1-150, AH1-151 |
|
| ComEd | (Pending) / CE_NUN_L11103_1 | TC2 NETWORK UPGRADE - 138KV L11103 | 24 to 30 Months | $2,600,000 | AH1-563 |
|
| ComEd | (Pending) / CE_NUN_L11104-1 | TC2 NETWORK UPGRADE L11104 | 12 to 15 Months | $600,000 | AG2-575, AH1-285, AH1-338, AH1-341 |
|
| ComEd | (Pending) / CE_NUN_L11301_1 | Sandwich - Waterman L11301 138 Kv Line Upgrades | 16 to 24 Months | $9,700,000 | AG2-575, AG2-660, AH1-044, AH1-150, AH1-151, AH1-338, AH1-341 |
|
| ComEd | (Pending) / CE_NUN_L1205-1 | TC2 Network Upgrade- L1205 | 24 to 30 Months | $2,800,000 | AG2-524 |
|
| ComEd | (Pending) / CE_NUN_L14609_1 | L14609 Line Reconductor and Station Conductor Upgrade | 24 to 30 Months | $2,500,000 | AG2-575, AH1-285, AH1-338, AH1-341 | AG2-660, AH1-044, AH1-150, AH1-151 |
| ComEd | (Pending) / CE_NUN_L17705_1 | Reconductor Sheffield - Burnham and upgrade station conductor at Burnham | 24 to 30 Months | $14,000,000 | AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-714 |
|
| ComEd | (Pending) / CE_NUN_L18623.2 | Haumesser - Steward 138 kV Line Reconductor | 18 to 24 Months | $8,500,000 | AG2-575, AG2-660, AH1-044, AH1-150, AH1-151, AH1-338, AH1-341 |
|
| ComEd | (Pending) / CE_NUN_L8014.3 | L8014 Reconductor & terminal work. | 30 to 36 Months | $98,000,000 | AG2-114, AH1-541, AH1-670 |
|
| ComEd | (Pending) / CE_NUN_L95201_1 | 194 Sabrooke Station Conductor | 12 to 16 Months | $500,000 | AH1-564 |
|
| ComEd | (Pending) / CE_NUN_TSS 111 | TSS 167 Plano new circuit breaker | 12 to 18 Months | $5,000,000 | AG2-660, AH1-044, AH1-150, AH1-151 |
|
| ComEd | (Pending) / CE_NUN_TSS155_TR83 | TSS155 Nelson New Transformer | 24 to 30 Months | $15,200,000 | AG2-660, AH1-044, AH1-150, AH1-151 |
|
| ComEd | b3775.1 | Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line | Dec 01 2026 |
| AG2-029, AG2-072, AG2-400 | |
| ComEd | b3811.1 / CE_PJM B3811_L11323 | Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus. | Dec 01 2028 |
| AG2-575, AH1-338, AH1-341 | |
| ComEd | b3811.2 / CE_PJM B3811_L11323 | Additional Circuit Breaker at ESS H452 | Dec 01 2028 |
| AG2-575, AH1-338, AH1-341 | |
| ComEd | b3811.3 / CE_PJM B3811_L11323 | Rebuild 3 miles of 138 kV line 11323 from Haumesser Road to the H-452 tap | Dec 01 2028 |
| AG2-575, AH1-338, AH1-341 | |
| ComEd | b3915.1 | Reconductor 345 kV lines 1202 and 1227 from Dresden to Mulberry | Jun 01 2029 |
| AG2-363, AG2-364, AH1-543 | |
| ComEd | b3915.2 | Equipment upgrades at Dresden 345 kV Substation | Jun 01 2029 |
| AG2-363, AG2-364, AH1-543 | |
| ComEd | b3915.3 | Equipment upgrades at Mulberry 345 kV Substation | Jun 01 2029 |
| AG2-363, AG2-364, AH1-543 | |
| ComEd | n3515.1 / ce-017 | Cherry Valley - Garden Prarie 345 kV: Line rebuild, station bus work, & Cherry Valley 345kV breaker replacement | 50 Months | $84,712,245 |
| AG2-516, AH1-146, AH1-147, AH1-341, AH1-564 |
| ComEd | n5318.1 / ce-012a | Garden Prarie - Silver Lake R 345 kV: Line rebuild, station bus work & Silver Lake 345kV Breaker Replacement | 60 Months | $163,968,683 |
| AG2-516, AH1-146, AH1-147, AH1-196, AH1-341, AH1-564 |
| ComEd | n5792 / CE_NUN_L11323 | Rebuild Haumesser - West Dekalb 138 kV line (L11323) | 30 Months | $10,479,841 | AG2-575, AH1-338, AH1-341 |
|
| ComEd | n6260.1 / CE_NUN_8012 | Upgrade of TSS 80 Pontiac 345kV circuit breaker BT 4-5 and 345kV station and bus conductor | 60 Months | $3,599,608 |
| AG2-114, AH1-541, AH1-670 |
| ComEd | n6260.3 / CE_NUN_L8012_1 | Station upgrade and line re-conductoring Loretto - Pontiac 345 kV line | 30 Months | $21,600,000 | AH1-541, AH1-670 |
|
| ComEd | n6280 / ce-005 | Mitigate the sag on the ComEd Powerton - Tazewell L0304 345 kV line. | Nov 01 2026 |
| AG2-363, AG2-364 | |
| ComEd | n6779 / CE_NUN_L14609 | Plano 138 KV re-conductor a portion of the line | 30 Months | $5,600,000 | AG2-575, AH1-285, AH1-338, AH1-341 | AG2-660, AH1-044, AH1-150, AH1-151 |
| ComEd | n7023.1 / CE_NUN_L11124.1 | Reconductor the Electric Junction - Lombard line L11124 345 kV Line and perform associated station relay and protection upgrades. | 36 Months | $38,797,273 |
| AH1-044, AH1-150, AH1-151 |
| ComEd | n7941 / CE_NUN_8001 | Pontiac - Z2-087 (McLean) Sag Mitigation | 30 Months | $10,500,000 |
| AH1-670 |
| ComEd | n7941.1 / CE_NUN_8001_1 | Pontiac Line Reconductor and Station Work | 31 to 52 Months | $95,900,398 | AH1-670 |
|
| ComEd | n8379 / CE_NUN_L11212_NEW TR | Wilton Center - Install 3rd Transformer | 48 Months | $38,000,000 | AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-714 |
|
| ComEd | n8389 / CE_N8389_116BT3-4_1 | TSS 116 Replace Station Conductor | 24 Months | $1,000,000 | AG2-363, AG2-364, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151 |
|
| ComEd | n9195.0 / CE_NUN_STA12_345 NEW CB | Install a new 345 kV circuit breaker at Station 12 Dresden. | 45 Months | $3,357,627 |
| AG2-114, AH1-541, AH1-670 |
| ComEd | n9269.0 / CE_NUN_L11212.5 | Reconductorthe L11212 345 kV line. | 42 Months | $37,989,655 |
| AG2-453, AH1-714 |
| ComEd | n9315.0 / N9315.0 | Upgrade station conductors and equipment at TSS 80 Pontiac Substation | Dec 31 2027 | $914,669 |
| AH1-670 |
| ComEd | n9678.0 / CE_NUN_L11215_1 | Mitigate the sag on L11215 | 30 Months | $9,000,000 | AG2-363, AG2-364, AG2-453, AG2-660, AH1-044, AH1-146, AH1-147, AH1-150, AH1-151, AH1-234, AH1-338, AH1-714 |
|
| ComEd | s3011 / CE_S3011 | Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration. | Dec 31 2028 |
| AG2-363, AG2-364 | |
| DEOK | (Pending) / F4504 | DEOK New Sub and New 345kV Line from Tanner's Creek | 72 to 84 Months | $72,000,000 | AG2-072, AG2-165, AG2-212, AG2-328 |
|
| DEOK | n9176.0 / M240124 | Rebuild the 1.4 mile long feeder from McGuffey to Locust. | 36 to 39 Months | $5,315,554 | AG2-550, AG2-551, AG2-637 |
|
| DEOK | n9186.0 / M240135 | Rebuild ~1.40 mile DEOK portion of Longbranch-Mt. Zion with new structures and 954ACSS/TW, 200C | 30 to 36 Months | $4,803,522 | AG2-073, AG2-081, AG2-159, AH1-004, AH1-664, AH1-665, AH1-666, AH1-721 | AH1-427 |
| DEOK | n9187.0 / M220257 | Rebuild 11.9 mile DEOK portion of College Corner-Collinsville line with new structures and 954ACSS/TW Cardinal, 200C | 48 Months | $58,406,862 | AG2-550, AG2-637 | AH1-337 |
| DPL | (Pending) / | Replace terminal equipment at Cambridge Substation (Jackson to Cambridge 69 kV Line Upgrade) (In Service) | 9 to 18 Months | $1,000,000 | AG2-181 |
|
| DPL | (Pending) / | Reconductor the transmission line and replacing terminal equipment at Cambridge Substation. | 36 to 60 Months | $10,000,000 | AG2-181 |
|
| DPL | (Pending) / | Replace terminal equipment at Vienne Substation (Sharptown - Vienna 69 kV Line) (In Service) | 9 to 12 Months | $500,000 | AG2-181 |
|
| DPL | (Pending) / | Replace terminal equipment at Keeney and Red Lion West Substation (Keeney - Red Lion West 230 kV Line) | 36 to 60 Months | $8,500,000 | AG2-347, AH1-634, AH1-710 |
|
| DPL | (Pending) / 6704-2 Kent | Upgrade disconnect switch at Kent Substation | 24 to 30 Months | $200,000 | AG2-281, AH1-536 | AG2-380 |
| DPL | (Pending) / 6708-2 | Rebuild Mardela - Hebron 69kV line | 55 to 65 Months | $8,080,000 | AG2-181 |
|
| DPL | b2946 | PJM baseline upgrade b2946 conversion of Preston station to a Ring Bus | May 31 2026 |
| AG2-181, AG2-347, AH1-380, AH1-584, AH1-585, AH1-586, AH1-634 | |
| DPL | b3143.2 | B3143.2: Reconductor the Darley – Naamans Road 69 kV circuit | Dec 30 2026 |
| AG2-347 | |
| DPL | n6925 / dt22085r0001 | Rebuild Edge Moor (DPL) - Linwood (PECO) 230 kV line. | 36 to 48 Months | $71,680,000 |
| AG2-347 |
| DPL | n6926 / dt22084r0001 | Rebuild (DPL) Claymont - (PECO) Linwood line and terminal equipment at Claymont. | 36 to 48 Months | $7,100,000 | AG2-281, AG2-347, AH1-584, AH1-585, AH1-586, AH1-634, AH1-672, AH1-710 |
|
| DPL | n6927 / dt23015r0001 | Rebuild Edge Moor to Claymont 230 kV line. Upgrade terminal equipment at Claymont and Edge Moor. | 36 to 48 Months | $23,000,000 | AG2-347, AH1-584, AH1-585, AH1-586, AH1-634, AH1-672 |
|
| DPL | n7038 / dt13703r0001 | Rebuild Indian River to Nelson 138 kV circuit. | Oct 31 2026 | $85,560,000 | AH1-584, AH1-585, AH1-586 |
|
| DPL | n7039 / ds13703r0001 | Replace terminal equipment at Nelson (In Service) | 9 to 12 Months | $250,000 | AH1-584, AH1-585, AH1-586 |
|
| DPL | n7042 / dt6704r0001 | Rebuild Kent to N. Meredith Tap. Upgrade disconnect switch @ N Meredith | Oct 30 2026 | $7,600,000 | AG2-281, AH1-536 | AG2-380 |
| DPL | n7746 / ds22085r0001 | MEtering & Terminal upgrades at the Edge Moor 230kV Substation | 12 Months | $1,100,000 | AG2-347, AH1-584, AH1-585, AH1-586, AH1-634, AH1-672 |
|
| Dayton | (Pending) / Dayton-TC2-18817 | Replace Stuart Switches to 4000 A | 48 to 60 Months | $1,200,000 | AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721 |
|
| Dayton | (Pending) / Dayton-TC2-18818 | Replace Wavetrap to 4000 A | 48 to 60 Months | $100,000 | AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721 |
|
| Dayton | n9670.0 / DAYr190039 | Reconductor Stuart-Spurlock line with twin bundle 1033 Curlew ACCR conductor. | 60 to 72 Months | $50,000,000 | AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721 |
|
| Dayton | n9671.0 / DAYr190040 | Replace Stuart substation bus and conductor | 48 to 60 Months | $1,000,000 | AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721 |
|
| Dayton | n9672.0 / DAYr190041 | Replace Stuart substation breakers to 4000 A breakers | 48 to 60 Months | $2,000,000 | AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721 |
|
| Dominion | (Pending) | Dominion work to accomodate new Person - Hendrick 230 kV tie line | 42 to 48 Months | $8,894,000 |
| AG2-077, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-581, AG2-583, AG2-659, AH1-056, AH1-241, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546 |
| Dominion | (Pending) / TC1-PH1-DOM-006 | Add a 3rd new 224 MVA 115/230 kV Transformer at Cloud substation, one (1) 230 kV breaker and one (1) 115 kV breaker. | 42 to 44 Months | $11,000,000 | AG2-171, AG2-213, AG2-270, AG2-341, AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-056, AH1-408 | AH1-215 |
| Dominion | (Pending) / TC1-PH1-DOM-023 | Replace Wave Trap 153WT at Oak Green 115 kV. | 16 to 18 Months | $300,000 | AH1-676 |
|
| Dominion | (Pending) / TC1-PH1-DOM-024 | Replace 1590 ACSR line lead on Line 153 at Oak Green 115 kV | 12 to 18 Months | $400,000 | AH1-676 |
|
| Dominion | (Pending) / TC1-PH1-DOM-079 | Replace Wave Trap 567 WT at Surry 500 kV | 16 to 18 Months | $600,000 | AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-570, AG2-571, AH1-040, AH1-528, AH1-716 |
|
| Dominion | (Pending) / TC1-PH1-DOM-083 | Wreck and Rebuild 2.48 miles of 115 kV line between Oak Green and Orange Tap | 30 to 36 Months | $7,936,000 | AH1-676 |
|
| Dominion | (Pending) / TC1-PH1-DOM-096 | Wreck and rebuild 2.8 mi of 115 kV Line 15 between Huber DP and Sedgehill with (1) 768,2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C | 30 to 36 Months | $8,960,000 | AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343 |
|
| Dominion | (Pending) / TC1-PH2-DOM-0012 | Wreck and rebuild 8.1 miles of 230 kV Line 2027 (future Line 2323) between Bremo and AG2-583 with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 36 to 42 Months | $30,780,000 | AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC1-PH3-DOM-007 | Replace Wave Trap 2028WT at Charlottesville | 16 to 18 Months | $400,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0000 | Replace 1590 AAC Line Lead on Line 1045 at Chase City 115 kV. | 12 to 18 Months | $400,000 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396 | AH1-215 |
| Dominion | (Pending) / TC2-PH1-DOM-0001 | Replace Switch 104515 at Chase City 115 kV with a 3000A Switch. | 12 to 18 Months | $300,000 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396 | AH1-215 |
| Dominion | (Pending) / TC2-PH1-DOM-0002 | Wreck and Rebuild 0.88 miles of 115 kV Line 1045 between Butcher Creek and Chase City with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 30 to 36 Months | $3,234,800 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396 | AH1-215 |
| Dominion | (Pending) / TC2-PH1-DOM-0003 | Replace 1351 ACSR Line Lead on Line 154 at Pamplin 115 kV. | 12 to 18 Months | $400,000 | AG2-440, AG2-441, AG2-442, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0004 | Wreck and rebuild 5.93 miles of 115 kV Line 154 between AG2-440 and Madisonville DP with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 30 to 36 Months | $21,822,400 | AG2-440, AG2-441, AG2-442, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0007 | Replace 1351 ACSR Line Lead on Line 154 at AF2-222 115kV. | 12 to 18 Months | $400,000 | AG2-440, AG2-441, AG2-442, AH1-056 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0008 | Replace 1351 ACSR Line Lead on Line 154 at Twittys Creek 115kV. | 12 to 18 Months | $400,000 | AG2-440, AG2-441, AG2-442, AH1-056 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0009 | Wreck and Rebuild 0.05 miles of 115 kV Line 158 between Flat Creek and Moran DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE". | 30 to 36 Months | $160,000 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396, AH1-408 | AG2-341, AH1-215 |
| Dominion | (Pending) / TC2-PH1-DOM-0010 | Wreck and Rebuild 5.36 miles of 115 kV Line 158 between Farmville and Moran DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE". | 30 to 36 Months | $17,152,000 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396, AH1-408 | AG2-341, AH1-215 |
| Dominion | (Pending) / TC2-PH1-DOM-0011 | Replace 795 AAC Line Lead on Line 158 at Farmville 115 kV. | 12 to 18 Months | $400,000 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396, AH1-408 | AG2-341, AH1-215 |
| Dominion | (Pending) / TC2-PH1-DOM-0013 | Wreck and rebuild 1.51 miles of 230 kV Line 2027 (future Line 2323) between Cartersville and AG2-583 with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 36 to 42 Months | $5,738,000 | AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0014 | Wreck and rebuild 0.17 miles of 230 kV Line 2027 between Midlothian and Powhatan with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 36 to 42 Months | $646,000 | AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0018 | Replace 2-795 AAC line lead on Line 2074 at Lousia CT 230 kV. | 12 to 18 Months | $500,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0019 | Wreck and rebuild 0.4 miles of 230 kV Line 2074 between Louisa CT and South Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $1,520,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0020 | Wreck and rebuild 0.63 miles of 230 kV Line 2074 between Louisa CT and South Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $2,394,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0027 | Wreck and rebuild 13.05 miles of 230 kV Line 2202 between Desper and South Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 Degrees C. | 42 to 48 Months | $49,590,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0028 | Wreck and rebuild 0.63 miles of 230 kV Line 2202 between Desper and South Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 Degrees C | 36 to 42 Months | $2,394,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0029 | Replace Switch 220216 at South Anna 230 kV with a 4000A switch. | 12 to 18 Months | $400,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0030 | Replace (2) 3-1/2" AL Pipe Line Leads on Line 2202 and Breaker Leads at South Anna 230 kV. | 12 to 18 Months | $1,000,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0031 | Replace 2-1590 AAC Line Lead on Line 2202 at Desper 230 kV. | 12 to 18 Months | $500,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0032 | Replace Wave Trap 2202WT at Desper 230 kV. | 16 to 18 Months | $400,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0033 | Replace Wave Trap 2202WT at South Anna 230 kV. | 16 to 18 Months | $400,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0034 | Replace Breaker 2074T2202 at South Anna 230 kV. | 42 to 48 Months | $2,000,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0035 | Wreck and rebuild 0.37 miles of 115 kV Line 4 between Cobbs Creek and AH1-241 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 30 to 36 Months | $1,184,000 | AH1-241 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0043 | Wreck and rebuild 3.62 miles of 230 kV Line 2091 between Chickahominy and Elko with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $13,756,000 | AG2-010, AG2-646, AH1-042, AH1-157, AH1-716 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0044 | Wreck and rebuild 4.5 miles of 230 kV Line 2204 between Black Walnut and Edmonson with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $17,100,000 | AG2-068, AG2-069, AG2-152, AG2-369, AG2-541, AG2-570, AG2-571, AH1-314, AH1-343 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0045 | Wreck and rebuild 8.3 miles of 230 kV Line 2250 between Edmonson and Sedge Hill with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $31,540,000 | AG2-068, AG2-069, AG2-077, AG2-152, AG2-188, AG2-198, AG2-270, AG2-369, AG2-440, AG2-441, AG2-442, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AH1-056, AH1-314, AH1-343, AH1-377, AH1-439, AH1-528 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0046 | Wreck and rebuild 7.28 miles of 230 kV Line 228 between Chesterfield and Hopewell with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $27,664,000 | AG2-093, AG2-428, AG2-436, AG2-570, AG2-571, AH1-216, AH1-324, AH1-528, AH1-717 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0047 | Wreck and rebuild 0.88 miles of 230 kV Line 228 between Chesterfield and Hopewell with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C | 36 to 42 Months | $3,344,000 | AG2-093, AG2-428, AG2-436, AG2-570, AG2-571, AH1-216, AH1-324, AH1-528, AH1-717 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0048 | Replace 2-1590 AAC line lead on Line 259 at Basin 230 kV | 12 to 18 Months | $500,000 | AG2-068, AG2-069, AG2-077, AG2-093, AG2-384, AG2-427, AG2-428, AG2-436, AG2-570, AG2-571, AG2-581, AH1-528, AH1-717 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0049 | Wreck and rebuild 12.98 miles of 230 kV Line 283 between Elmont and Northeast with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees | 42 to 48 Months | $49,324,000 | AG2-428, AG2-436, AG2-570, AG2-571, AH1-042, AH1-528, AH1-717 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0050 | Wreck and rebuild 13.78 miles of 230 kV Line 287 between Chesterfield and Chickahominy with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 42 to 48 Months | $52,364,000 | AG2-093, AG2-646 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0051 | Wreck and rebuild 0.003 miles of 230 kV Line 296 between Sedge Hill and Alton Post (AC1-221) with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $11,400 | AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-343, AH1-377, AH1-439, AH1-528 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0063 | Wreck and rebuild 1.66 miles of 115 kV Line 154 between AF2-222 and Twittys Creek with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 30 to 36 Months | $6,108,800 | AG2-440, AG2-441, AG2-442, AH1-056 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0071 | Wreck and rebuild 14.02 miles of 500 kV Line 573 between Spotsylvania and North Anna with (3) 1351.5 ACSS TW/HS285 (42/19) "MARTIN". | 18 to 48 Months | $82,718,000 | AG2-088, AG2-436, AH1-528, AH1-676, AH1-681, AH1-712, AH1-716, AH1-723 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0072 | Replace 2-2500 ACAR 84/7 line lead on Line 573 at North Anna 500 kV | 12 to 18 Months | $600,000 | AG2-088, AG2-436, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0073 | Replace Wave Trap 573WT at Spotsylvania 500 KV | 16 to 18 Months | $600,000 | AG2-088, AG2-436, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0075 | Wreck and rebuild 18.75 miles of 500 kV Line 594 between Spotsylvania and Morrisville with (3) 1351.5 ACSS TW/HS285 (42/19) "MARTIN" | 18 to 60 Months | $110,625,000 | AG2-088, AG2-428, AG2-436, AG2-570, AG2-571, AH1-263, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0076 | Replace Wave Trap 594WT at Morrisville 500 KV | 16 to 18 Months | $600,000 | AG2-088, AG2-436, AH1-263, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0077 | Replace Wave Trap 594WT at Spotsylvania 500 KV | 16 to 18 Months | $600,000 | AG2-088, AG2-436, AH1-263, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0078 | Replace 3-1590 AAC 61 line lead on Line 594 at Morrisville 500 kV | 12 to 18 Months | $600,000 | AG2-088, AG2-436, AH1-263, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723 |
|
| Dominion | (Pending) / TC2-PH1-DOM-0080 | Replace switch 219326 at Bremo 230 kV | 12 to 18 Months | $400,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1000 | Wreck and rebuild 0.05 miles of 115 kV Line 44 between Oak Ridge to Myrtle with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 30 to 36 Months | $160,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1001 | Replace 795 AAC Line Lead on Line 44 at Myrtle 115 kV. | 12 to 28 Months | $400,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1002 | Wreck and rebuild 0.04 miles of 115 kV Line 44 between Myrtle and AD2-085 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 30 to 36 Months | $128,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1003 | Replace 795 AAC Line Lead on Line 44 at Myrtle 115 kV. | 12 to 18 Months | $400,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1004 | Wreck and rebuild 0.07 miles of 115 kV Line 44 between Bell Avenue to Windsor DP (CEC) with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 30 to 36 Months | $224,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1005 | Wreck and rebuild 0.10 miles of 115 kV Line 99 between Peninsula and AG2-010 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 30 to 36 Months | $320,000 | AG2-010 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1007 | Wreck and rebuild 0.87 miles of 230 kV Line 2083 between Fredericksburg to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 36 to 42 Months | $3,306,000 | AG2-005, AG2-215, AG2-366, AG2-469, AG2-646, AH1-042, AH1-157, AH1-716 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1008 | Replace 3 & 1/2" Line Lead on Line 2157 at Cranes Corner 230 kV. | 12 to 18 Months | $500,000 | AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1009 | Replace 2 x 2-1590 Line Leads on Line 2157 at Cranes Corner 230 kV. | 12 to 18 Months | $1,000,000 | AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1010 | Replace Breaker 2104T2157 at Cranes Corner 230 kV. | 42 to 48 Months | $2,000,000 | AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1011 | Replace 1033.5 ACSR Line Lead on Line 2157 at Fredericksburg 230 kV. | 12 to 18 Months | $500,000 | AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1013 | Re-conductor 5.8 mi of 230 kV underground cable 2120 from Garrisonville to Aquia Harbor with 2-5000 kcmil CU. | 36 to 42 Months | $116,000,000 | AG2-428, AG2-469, AH1-042, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1014 | Wreck and rebuild 0.73 miles of 115 kV line 1012 between AH1-215 and Twittys Creek with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C. | 30 to 36 Months | $2,686,400 | AG2-440, AG2-441, AG2-442, AH1-056 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1015 | Replace 1351.5 ACSR risers on 115 kV line 1012 between AH1-215 and Twittys Creek with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C | 12 to 18 Months | $10,000 | AG2-440, AG2-441, AG2-442, AH1-056 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1016 | Replace 1351 ACSR line lead on line 1012 at Twitty's Creek 115 kV | 12 to 18 Months | $400,000 | AG2-440, AG2-441, AG2-442, AH1-056 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1017 | Replace wave traps 1012WT and 154WT at Twitty's Creek 115 kV | 16 to 18 Months | $600,000 | AG2-440, AG2-441, AG2-442, AH1-056 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1019 | Wreck and rebuild 0.73 miles of 115 kV line 1012 between Central and AH1-215 with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C. | 30 to 36 Months | $2,686,400 | AG2-188, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215, AH1-439 | AH1-546 |
| Dominion | (Pending) / TC2-PH1-DOM-1021 | Wreck and rebuild 8.94 miles of 115 kV line 1012 between AG1-285 and Chase City with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C. | 30 to 36 Months | $32,899,200 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1023 | Replace switch 101215 at Chase City 115 kV | 12 to 18 Months | $300,000 | AG2-188, AG2-198, AG2-440, AG2-441, AG2-442, AG2-566, AH1-056, AH1-215, AH1-439, AH1-546 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1024 | Wreck and rebuild 5.62 miles of 115 kV line 1012 between Chase City and AG1-285 with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C. | 30 to 36 Months | $20,681,600 | AG2-188, AG2-198, AG2-440, AG2-441, AG2-442, AG2-566, AH1-056, AH1-215, AH1-439, AH1-546 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1025 | Replace jumper 768.2 ACSS with (2) 768.2 ACSS/TW (20/7) "Maumee" at 250 degrees C. | 12 to 18 Months | $5,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1026 | Replace wave trap 1012WT at Chase City 115 kV | 16 to 18 Months | $300,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1027 | Replace switch 101214 at Chase City 115 kV | 12 to 18 Months | $300,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1031 | Wreck and rebuild 12.94 miles of 230 kV Line 235 from Briery to Farmville with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. | 42 to 48 Months | $49,172,000 | AG2-077, AG2-198, AG2-270, AG2-566, AG2-581, AH1-377, AH1-528 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1032 | Wreck and rebuild 0.73 miles of 230 kV line 235 between AG1-098 and Finneywood with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C | 36 to 42 Months | $2,774,000 | AG2-077, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-215, AH1-217, AH1-241, AH1-280, AH1-377, AH1-439, AH1-528, AH1-546, AH1-676, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1036 | Wreck and rebuild 37.41 mi of 500 kV line 563 between Carson and Midlothian with (3) 1351.5 ACSS TW/HS285 (42/19) "MARTIN" at 145 degrees C | 48 to 60 Months | $157,122,000 | AG2-068, AG2-069, AG2-077, AG2-338, AG2-339, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-570, AG2-571, AG2-581, AH1-528, AH1-716 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1037 | Replace Breaker 56372 at Carson 500 kV with 5000 Amp device | 42 to 48 Months | $2,750,000 | AG2-068, AG2-069, AG2-338, AG2-339, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-570, AG2-571, AG2-581, AH1-528 |
|
| Dominion | (Pending) / TC2-PH1-DOM-1042 | Add a 2nd new 224 MVA 115/230 kV Transformer at Harmony Village substation and add one (1) 115 kV breaker and one (1) 230 kV breaker | 42 to 48 Months | $17,500,000 | AG2-005, AG2-366 | AH1-397 |
| Dominion | (Pending) / TC2-PH1-DOM-2001 | Wreck and rebuild 2.66 miles of 115 kV line 1016 between Crystal Hill DP and AH1-343 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 30 to 36 Months | $8,512,000 | AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2002 | Replace 556.6 ACSR line lead on line 104 at AltaVista 138 kV | 12 to 18 Months | $400,000 | AG2-152, AG2-311 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2004 | Replace 2-1590 AAC 61 line lead on line 2032 at Four Rivers 230 kV. | 12 to 18 Months | $500,000 | AG2-208, AG2-428, AG2-436, AG2-570, AG2-571, AH1-042, AH1-323, AH1-528, AH1-679, AH1-681, AH1-712, AH1-723 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2005 | Wreck and rebuild 5.74 mi of 230 kV Line 230 between Four Rivers and Hanover with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C | 36 to 42 Months | $21,812,000 | AG2-208, AG2-428, AG2-436, AG2-570, AG2-571, AH1-042, AH1-323, AH1-528, AH1-679, AH1-681, AH1-712, AH1-723 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2007 | Replace Line Lead on Line 71 at Clubhouse 115 kV | 12 to 18 Months | $400,000 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-408 | AG2-077, AH1-215 |
| Dominion | (Pending) / TC2-PH1-DOM-2008 | Wreck and rebuild 0.47 miles of 230 kV Line 2241 between Hendrick and Alton Post with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $1,786,000 | AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-343, AH1-377, AH1-439, AH1-528 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2009 | Replace Wave Trap 11WT at Oak Green 115 kV | 16 to 18 Months | $300,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2010 | Replace 1590 AAC 61 line lead on Line 11 at Oak Green 115 kV | 12 to 18 Months | $400,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2011 | Wreck and rebuild 3.25 mi of 115 kV Line 15 between Disputanta and Poe with (1) 768,2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C | 30 to 36 Months | $10,400,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2012 | Wreck and rebuild 6.68 mi of 115 kV Line 15 between Pumphouse and Poe with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C | 30 to 36 Months | $24,582,400 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2013 | Wreck and rebuild 0.05 mi of 115 kV Line 15 between Pumphouse and Poe with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C | 30 to 36 Months | $184,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2014 | Replace 795 AAC 37 line lead on Line 15 at Poe 115 kV | 12 to 18 Months | $400,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2015 | Replace switch 1554 at Poe 115 kV | 12 to 18 Months | $300,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2016 | Replace/Remove Relay Trip at Poe | 20 to 26 Months | $750,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2017 | Remove Wave Trap 15WT at Poe 115 kV | 16 to 18 Months | $300,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2018 | Wreck and rebuild 0.07 miles 115 kV Line 15 between Bell Ave and Wakefield with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C | 30 to 36 Months | $224,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2019 | Wreck and rebuild 3.85 miles 115 kV Line 15 between Wakefield and AG2-426 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C | 30 to 36 Months | $12,320,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2020 | Wreck and rebuild 2.45 miles of 115 kV Line 15 between Waverly and Waverly DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C | 30 to 36 Months | $7,840,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2021 | Wreck and rebuild 0.09 miles 115 kV Line 15 between Waverly and Waverly DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C | 30 to 36 Months | $288,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2022 | Wreck and rebuild 0.03 miles of 115 kV Line 15 between Waverly and Waverly DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C, and replace jumper with higher rated equipment | 30 to 36 Months | $101,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2023 | Wreck and rebuild 5.94 miles of 115 kV Line 15 between Waverly DP and Disputanta with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 deg. C | 30 to 36 Months | $19,008,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2024 | Wreck and rebuild 4.40 miles 115 kV Line 15 between Waverly and AG2-426 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C | 30 to 36 Months | $14,080,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2025 | Wreck and rebuild 0.07 miles 115 kV Line 15 between Waverly and AG2-426 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C | 30 to 36 Months | $224,000 | AG2-426, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2026 | Replace 115 kV Line 15 jumpers between Waverly and AG2-426 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C | 12 to 18 Months | $5,000 | AG2-426, AG2-428 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2027 | Replace switches 8434 and 8435 at Farmville 115 kV | 12 to 18 Months | $600,000 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2028 | Wreck and rebuild 4.46 miles of 115 kV line 84 between Willis Mt. and Farmville with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C | 30 to 36 Months | $16,412,800 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2029 | Replace 2-795 AAC line lead on line 84 at Farmville 115 kV | 12 to 18 Months | $400,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2030 | Replace wave trap 84WT at Farmville 115 kV | 16 to 18 Months | $300,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2031 | Replace switch 8426 at Willis Mt 115 kV | 12 to 18 Months | $300,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2032 | Replace CT primaries at Farmville 115 kV | 24 Months | $750,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2033 | Replace 2-1590 AAC line lead on line 84 at Farmville 115 kV | 12 to 18 Months | $400,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2034 | Replace CT Secondaries at Farmville 115 kV | 24 Months | $750,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2035 | Replace breaker 8432 at Farmville 115 kV | 42 to 48 Months | $1,500,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2036 | Wreck and rebuild 13.26 miles of 115 kV line 84 between Pamplin and Willis Mt. with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C | 36 to 40 Months | $48,796,800 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2037 | Wreck and rebuild 0.1 miles of 115 kV line 84 between Pamplin and Willis Mt. with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C | 30 to 36 Months | $368,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2038 | Replace wave trap 84WT at Pamplin 115 kV | 16 to 18 Months | $300,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2039 | Replace 1351 ACSR line lead on line 84 at Pamplin 115 kV | 12 to 18 Months | $400,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2040 | Replace switch 8429 at Willis Mt 115 kV | 12 to 18 Months | $300,000 | AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2042 | Replace 2-795 AAC line lead on line 1059 at Northern Neck 115 kV | 12 to 18 Months | $400,000 | AG2-005, AG2-366 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2043 | Wreck and rebuild 0.93 miles of 230 kV Line 2241 between Hendrick and Persons with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. Dominion portion of line only. | 36 to 42 Months | $3,534,000 | AG2-068, AG2-069, AG2-077, AG2-111, AG2-112, AG2-151, AG2-152, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-272, AG2-341, AG2-369, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AG2-659, AH1-056, AH1-215, AH1-241, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-535, AH1-546, AH1-687, AH1-690, AH1-721 | AG2-660, AH1-044, AH1-150, AH1-151 |
| Dominion | (Pending) / TC2-PH1-DOM-2044 | Wreck and rebuild 0.03 miles of 115 kV Line 65 between Rappahannock and White Stone with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C | 30 to 36 Months | $110,400 | AG2-005, AG2-366 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2045 | Wreck and rebuild 1.33 miles of 115 kV Line 65 between White Stone and Ocran with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C | 30 to 36 Months | $4,894,400 | AG2-005, AG2-215, AG2-366 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2047 | Wreck and rebuild 0.04 mi of 115 kV line 65 from Ocran to Lancaster with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C. | 30 to 36 Months | $147,200 | AG2-005, AG2-366 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2048 | Wreck and rebuild 2.97 mi of 115 kV line 65 from Ocran to Lancaster with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C. | 30 to 36 Months | $10,929,600 | AG2-005, AG2-215, AG2-366 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2049 | Wreck and rebuild 5.86 mi of 115 kV line 65 from Lancaster to AG1-146 with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C. and replace 636 ACSR and 1534 ACAR Jumper. | 30 to 36 Months | $21,569,800 | AG2-005, AG2-215, AG2-366, AG2-469 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2052 | Wreck and rebuild 0.74 miles of 230 kV Line 2304 between Desper and Louisa Pumping Station with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C | 36 to 42 Months | $2,812,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2053 | Replace MAINLINE JUMPER 1590 ACSR (45/7) @150 Deg. C with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C | 12 to 18 Months | $10,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2054 | Replace 2-1590 AAC 61 line lead on Line 2304 at Desper 230 kV | 12 to 18 Months | $500,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2055 | Replace wavetrap 255WT at Desper 230 kV | 16 to 18 Months | $400,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2056 | Replace switch 25599 at Louisa Pumping 230 kV | 12 to 18 Months | $400,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2057 | Wreck and rebuild 0.25 miles of 230 kV Line 2304 between Louisa Pumping Station and Louisa with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C | 36 to 42 Months | $950,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2058 | Replace MAINLINE JUMPER 1590 ACSR (45/7) @150 Deg. C with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C | 12 to 18 Months | $10,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2059 | Wreck and rebuild 7.57 miles of 230 kV Line 2304 between Louisa and AH1-012 with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C | 36 to 42 Months | $28,766,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2060 | Wreck and rebuild 7.83 miles of 230 kV Line 2304 between AH1-012 and Southall with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C | 36 to 42 Months | $29,754,000 | AH1-012, AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2061 | Wreck and rebuild 0.82 miles of 230 kV Line 255 between Southall and North Anna with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C | 36 to 42 Months | $3,116,000 | AH1-012, AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2062 | Replace 2-1590 AAC line lead on line 255 at North Anna 230 kV | 12 to 18 Months | $500,000 | AH1-012, AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2063 | Wreck and rebuild 0.11 miles of 230 kV line 2193 between Fork Union and Bremo Dist with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C | 36 to 42 Months | $418,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2064 | Replace 2-1590 line lead on line 2193 at Fork Union 230 kV | 12 to 18 Months | $500,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2065 | Replace switches 219324 and 219325 at Bremo 230 kV | 12 to 18 Months | $800,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2066 | Replace 2-636 ACSR line lead on line 2193 at Bremo 230 kV | 12 to 18 Months | $500,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2067 | Replace 3 1/2" pipe line lead on line 2193 at Bremo 230 kV | 12 to 18 Months | $500,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2068 | Wreck and rebuild 0.12 miles of 230 kV line 2028 between Fork Union and Grape Vine with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C | 36 to 42 Months | $456,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2069 | Replace 2-1590 AAC line lead on line 2028 at Fork Union 230 kV | 12 to 18 Months | $500,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2070 | Replace wave trap 2028WT at Fork Union 230 kV | 16 to 18 Months | $400,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2071 | Replace 2-1590 line lead on line 2028 at Mt. Eagle 230 kV | 12 to 18 Months | $500,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2072 | Replace 2500 ACAR line lead on line 2028 at Charlottesville 230 kV | 12 to 18 Months | $500,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2073 | Replace 2-1590 line lead on line 2028 at Charlottesville and Mt Eagle 230 kV | 12 to 18 Months | $500,000 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2074 | Rebuild underground line from Harmony Village to Greyspoint and operating the line at 230 kV. | 48 to 60 Months | $53,000,000 | AG2-005, AG2-215, AG2-366 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2076 | Replace wave trap 298 WT at Bremo 230 kV | 12 to 18 Months | $400,000 | AG2-068, AG2-069, AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2077 | Replace switches 29824 and 29825 at Bremo 230 kV | 12 to 18 Months | $800,000 | AG2-068, AG2-069, AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2078 | Replace 2-636 ACSR line lead on line 298 at Bremo 230 kV | 12 to 18 Months | $500,000 | AG2-068, AG2-069, AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2079 | Replace 3 1/2 " AL Pipe line lead on line 298 at Bremo 230 kV | 12 to 18 Months | $500,000 | AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-341, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2085 | Replace wavetrap 298WT at Farmville 230 kV | 16 to 18 Months | $400,000 | AG2-068, AG2-069, AG2-077, AG2-171, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-528 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2086 | Replace 3 1/2' AL Pipe line lead on line 298 at Farmville 230 kV | 12 to 18 Months | $500,000 | AG2-077, AG2-171, AG2-198, AG2-213, AG2-270, AG2-341, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-215, AH1-343, AH1-377, AH1-408, AH1-528 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2087 | Replace 2-1590 AAC 61 line lead on line 298 at Farmville 230 kV | 12 to 18 Months | $500,000 | AG2-077, AG2-171, AG2-198, AG2-213, AG2-270, AG2-341, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-215, AH1-343, AH1-377, AH1-408, AH1-528 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2090 | Add a 3rd new 3-480 MVA 230/500 kV Transformer at Elmont substation. Add one (1) 500 kV breaker and one (1) 230 kV breaker as required for the new transformer | 42 to 48 Months | $40,000,000 | AG2-382, AG2-427, AG2-428, AG2-436, AG2-570, AG2-571, AG2-581, AG2-646, AH1-040, AH1-042, AH1-216, AH1-271, AH1-323, AH1-324, AH1-408, AH1-528, AH1-717 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2091 | Replace the existing Finneywood 230/500 kV XFRM T1 with a 3-480 MVA rated device | 42 to 48 Months | $40,000,000 | AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-659, AH1-056, AH1-377, AH1-439 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2092 | Replace the existing Finneywood 230/500 kV XFRM T2 with a 3-480 MVA rated device | 42 to 48 Months | $40,000,000 | AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-659, AH1-056, AH1-377, AH1-439 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2094 | Replace 115 kV 768.2 Jumper on line 65 between Ocran and Lancaster with (2) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C. | 12 to 18 Months | $5,000 | AG2-005, AG2-366 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2095 | Wreck and rebuild 7.90 miles of 230 kV Line 2199 between Germanna and Cirrus with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 36 to 42 Months | $30,020,000 | AH1-676 |
|
| Dominion | (Pending) / TC2-PH1-DOM-2097 | Build a new 11.95 mile line from Aspen 230 kV to Dickerson 230 kV with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor at 250 degrees C. | 48 to 60 Months | $33,230,000 | AG2-304, AG2-436, AG2-570, AG2-571, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723, AH1-727, AH1-729 |
|
| Dominion | (Pending) / dom-164 | Wreck and rebuild 7.08 miles of 230 kV Line 208 between Ironbridge and Southwest with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $26,904,000 | AG2-093, AG2-428, AG2-646, AH1-042, AH1-717 |
|
| Dominion | (Pending) / dom-184 | Wreck and rebuild 0.97 mi of 115 kV Line 15 between Woodchuck Trail and Huber DP with (1) 768,2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C | 30 to 36 Months | $3,104,000 | AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343 |
|
| Dominion | b3692 | Rebuild approximately 27.7-miles of 500 kV transmission line from Elmont to Chickahominy. | Jun 01 2026 |
| AG2-077, AG2-428, AG2-436, AG2-570, AH1-040, AH1-528, AH1-716 | |
| Dominion | b3694.1 | Convert line #29 Aquia Harbor to Possum Point to 230 kV (Extended line #2104) and swap line #2104 and converted line #29 at Aquia Harbor backbone termination. | Sep 28 2029 |
| AG2-320, AG2-436, AG2-469, AH1-042, AH1-528 | |
| Dominion | b3694.4 | Reconductor/rebuild approx 7.6 miles of 230 kV line #2104 Cranes Corner-Stafford. Reconductor/rebuild approx 0.34 miles of 230 kV line #2104 Stafford-Aquia Harbor. Upgrade terminal equipment. | Apr 17 2026 |
| AG2-320, AG2-436, AG2-469, AH1-042, AH1-528 | |
| Dominion | b3694.8 | Partial wreck and rebuild 10.34 miles of 230 kV line #249 Carson-Locks to achieve a minimum summer emergency rating of 1572 MVA. | May 03 2025 |
| AG2-077, AG2-436, AG2-570, AH1-408, AH1-528 | |
| Dominion | b3800.242 | Upgrading switches 20366M and 20369M and line leads to 4000A continuous current rating of 230kV Line #203 at Edwards Ferry substation | Sep 13 2030 |
| AG2-436, AG2-570, AH1-528, AH1-676, AH1-712, AH1-723, AH1-727 | |
| Dominion | b3800.300 | Wreck/Rebuild 230kV Line #2135 segment Hollymeade Junction – Cash’s Corner using double-circuit capable 230 kV poles. (The second 230kV circuit will be wired but not have terminal ends.) | Jun 30 2028 |
| AG2-151, AG2-188, AG2-583, AH1-241, AH1-712, AH1-723 | |
| Dominion | b3800.302 | Upgrade Cash's Corner switches 213576 and 213579 and line leads to 4000A continuous current rating of 230kV Line #2135. | Jun 30 2028 |
| AG2-151, AG2-188, AG2-583, AH1-241, AH1-712, AH1-723 | |
| Dominion | b4000.300 | Rebuild approximately 1.71 miles of 230kV line 299 from the Marsh Run substation to the Remington CT substation. New conductor has a summer rating of 1573 MVA. | May 30 2029 |
| AH1-086, AH1-676 | |
| Dominion | b4000.303 | Uprate line #299 terminal equipment, line leads, and bus at Remington CT substation to be rated to 4000A. | May 30 2029 |
| AH1-086, AH1-676 | |
| Dominion | b4000.314 | Reconductor 230kV Line #2003 Chesterfield – Tyler segment. New conductor has a summer rating of 1573 MVA | Apr 22 2030 |
| AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-528 | |
| Dominion | b4000.315 | Reconductor 230kV Line #2003 Tyler – Poe segment. New conductor has a summer rating of 1573 MVA. | Apr 22 2030 |
| AG2-068, AG2-069, AG2-077, AG2-339, AG2-426, AG2-427, AG2-428, AG2-436, AG2-570, AG2-581, AH1-408, AH1-528 | |
| Dominion | b4000.316 | At Poe substation, uprate all Line #2003 terminal equipment, line leads, and bus to be rated to 4000A. | Apr 22 2030 |
| AG2-068, AG2-069, AG2-077, AG2-339, AG2-426, AG2-427, AG2-428, AG2-436, AG2-570, AG2-581, AH1-408, AH1-528 | |
| Dominion | b4000.317 | At Tyler substation, upgrade the necessary line terminal equipment to maintain 4000A at Tyler substation. | Apr 22 2030 |
| AG2-068, AG2-069, AG2-077, AG2-339, AG2-426, AG2-427, AG2-428, AG2-436, AG2-570, AG2-581, AH1-408, AH1-528 | |
| Dominion | b4000.317 | At Tyler substation, upgrade the necessary line terminal equipment to maintain 4000A at Tyler substation. | Apr 22 2030 |
| AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-528 | |
| Dominion | b4000.319 | Reconductor 230kV Line #2002 Carson – Poe. New conductor has a summer rating of 1573 MVA. | Mar 20 2030 |
| AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-377, AH1-408, AH1-528 | |
| Dominion | b4000.320 | At Carson substation, upgrade all line #2002 terminal equipment at Carson to 4000A. CCVTs will also be replaced due to aging. | Mar 20 2030 |
| AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-377, AH1-408, AH1-528 | |
| Dominion | b4000.321 | At Poe substation, upgrade all line #2002 terminal equipment at Carson to 4000A. CCVTs will also be replaced due to aging. | Mar 20 2030 |
| AG2-069, AG2-077, AG2-436, AG2-570, AG2-581, AH1-377, AH1-408, AH1-528 | |
| Dominion | b4000.326 | At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith. | Feb 24 2029 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.327 | Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme. | Feb 24 2029 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.334 | Reconductor 115kV line #121 from Poe - Prince George. Specifically, line #121 will be reconductored and converted to 230kV from Poe substation to Prince George substation. | Jan 10 2030 |
| AG2-093, AG2-095, AG2-427, AG2-661, AH1-216, AH1-324, AH1-717 | |
| Dominion | b4000.335 | At Poe substation, install a new 230kV six breaker ultimate ring bus which will fit the station to current 230kV standards. | Jan 10 2030 |
| AG2-093, AG2-095, AG2-427, AG2-661, AH1-216, AH1-324, AH1-717 | |
| Dominion | b4000.336 | Build a new 230-115kV Prince George substation along the existing 115 or 230kV corridor. | Jan 10 2030 |
| AG2-093, AG2-095, AG2-427, AG2-661, AH1-216, AH1-324, AH1-717 | |
| Dominion | b4000.341 | Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site. | Jul 13 2029 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.342 | Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill. | Jul 13 2029 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.343 | Uprate bus at Brambleton to support 500kV Line #558 (Aspen to Brambleton) uprate. | Nov 28 2025 |
| AG2-347, AG2-428, AG2-436, AG2-570, AH1-528, AH1-676, AH1-695, AH1-712, AH1-723, AH1-727 | |
| Dominion | b4000.344 | Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA. | Sep 16 2030 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.345 | Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA. | Sep 16 2030 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.346 | Cut-in 500kV line from Kraken substation into Yeat substation | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.348 | Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.349 | Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken. | Sep 16 2030 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.350 | Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken. | Sep 16 2030 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.351 | Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken. | Sep 16 2030 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.352 | Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point. | Sep 16 2030 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.353 | Upgrade 500kV terminal equipment at Elmont substation. | Jun 01 2028 |
| AG2-428, AG2-436, AG2-570, AH1-042, AH1-528, AH1-712, AH1-716, AH1-723 | |
| Dominion | b4000.354 | Ladysmith substation breakers replacement: 574T575 and 568T581 | Nov 14 2029 |
| AG2-088, AG2-428, AG2-436, AG2-570, AH1-042, AH1-528, AH1-676, AH1-712, AH1-723 | |
| Dominion | b4000.355 | Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section). | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.356 | Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section). | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | b4000.357 | Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat. | Jun 01 2029 |
| AG2-072, AG2-347, AG2-360, AG2-436, AG2-570, AG2-646, AH1-387, AH1-676, AH1-690, AH1-695, AH1-712, AH1-716, AH1-721, AH1-723 | |
| Dominion | n6113 | Add a 2nd new 224 MVA 115/230 kV Transformer at Carolina substation, expand 230 kV station to form a ring bus, add two (2) 230 kV breakers and one (1) 115 kV breaker. | 42 to 44 Months | $11,000,000 | AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-408 | AG2-077, AG2-213 |
| Dominion | n6114 | Add a 2nd 224 MVA 230/115 kV transformer and associated breakers at Clubhouse substation. | Feb 28 2027 | $24,500,000 | AG2-213, AG2-237, AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-056, AH1-408 | AG2-077, AG2-171 |
| Dominion | n6215 | Wreck and rebuild 18.56 miles of 230 kV Line 296 between Sedge Hill and Alton Post (AC1-221) with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 42 to 48 Months | $70,528,000 | AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-541, AG2-566, AG2-581, AG2-659, AH1-056, AH1-343, AH1-377, AH1-439, AH1-528 |
|
| Dominion | n6363 | Wreck and rebuild 2.59 miles of 115 kV Line 44 between Suffolk and Oak Ridge with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 30 to 36 Months | $8,288,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | n6365 | Wreck and rebuild 5.19 miles of 115 kV Line 44 between Oak Ridge to Myrtle with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 30 to 36 Months | $16,608,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | n6375 / dom-095 | Wreck and rebuild 1.96 mi of 115 kV Line 15 between Spotsylvania and Paytes Tap with (1) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 Deg. C | Dec 31 2028 | $6,272,000 | AH1-676 |
|
| Dominion | n6388 | Wreck and rebuild 9.32 miles of 115 kV Line 44 between Bell Avenue to Windsor DP (CEC) with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 30 to 36 Months | $29,824,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | n6389 | Wreck and rebuild 5.92 miles 115 kV Line 15 between Bell Ave and Wakefield with (1) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250 deg. C | 30 to 36 Months | $18,944,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | n6551 / dom-159 | Wreck and rebuild 7.32 miles of 230 kV Line 208 between Chesterfield and Ironbridge with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $27,816,000 | AG2-093, AG2-428, AG2-646, AH1-042, AH1-717 |
|
| Dominion | n6872 / dom-047 | Wreck and rebuild 15.05 miles of 230 kV line No. 238 between Clubhouse and AE2-033 tap with (2) 768.2 ACSS/TW (20/7) at 250C. | Dec 31 2029 | $59,572,939 |
| AG2-077, AG2-270, AG2-522, AH1-408, AH1-528 |
| Dominion | n7509 / dom-261 | Wreck and rebuild 0.06 miles of 115 kV Line 153 between Locust Grove DP and Unionville Tap with (1) 768.2 ACSS/TW (20/7) "MAUMEE" | 30 to 36 Months | $192,000 | AH1-676 |
|
| Dominion | n7511 / dom-367 | Wreck and rebuild 2.77 miles of line 1046 between Pine Glade and Paytes Tap with (1) 768.2 ACSS/TW (20/7) "Maumee" @ 250C | 30 to 36 Months | $8,864,000 | AH1-676 |
|
| Dominion | n7541 / dom-016 | Add a third 224 MVA 230/115 kV transformer at Earleys Substation and supporting equipment. | Dec 31 2029 | $22,779,395 |
| AG2-522, AG2-659, AH1-408 |
| Dominion | n7543 / dom-426 | Wreck and Rebuild 0.10 miles of 115 kV Line 1045 between Butcher Creek and Chase City with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 30 to 36 Months | $368,000 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396 | AH1-215 |
| Dominion | n7549 / dom-428 | Replace Northern Neck 115/230 kV transformer #4 with a 224 MVA (260/271/295 MVA). | 59 to 60 Months | $7,324,554 |
| AG2-005, AG2-124, AG2-215, AG2-366 |
| Dominion | n7553 / dom-427 | Replace Northern Neck 115/230 kV transformer #6 with a 224 MVA (260/271/295 MVA). | 59 to 60 Months | $7,242,347 |
| AG2-005, AG2-124, AG2-215, AG2-366 |
| Dominion | n7556 / dom-461-TC2 | Reconductor 3.53 miles of 115 kV Line 65 from AD2-074 Tap to AG1-146 Tap with (1) 768.2 ACSS/TW (20/70) ""Maumee"" conductor @ 250 degrees C | 43 to 44 Months | $16,493,251 | AG2-005, AG2-215 |
|
| Dominion | n7568 / dom-369-TC2 | Wreck and rebuild 6.47 miles of 230 kV transmission line 2028 between Charlottesville and Mt. Eagle with (2) 768.2 ACSS/TW (20/7) ""Maumee"" @ 250C and replace line lead at Mt. Eagle. | 43 to 44 Months | $36,802,018 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | n7569 / dom-490-TC2 | Upgrade a 3.78 mile segment of 230kV transmission line 2028 between Mt. Eagle and Grape Vine Substations at structure 2080/73. | 43 to 44 Months | $13,360,242 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | n7575 / dom-286-TC2 | Rebuild 6.46 mi miles of 2-545.6 ACAR (15/7) 90 MOT 230 kV Line 2083 from Fredericksburg to Fines with (2) 768.2 ACSS/TW (20/7) ""MAUMEE"" conductor @ 250 degrees C. | 43 to 44 Months | $33,559,690 | AG2-005, AG2-215, AG2-366, AG2-469, AG2-646, AH1-042, AH1-157, AH1-716 |
|
| Dominion | n7576 / dom-281-TC2 | Rebuild 7.91 miles of 230 kV Line 2083 from Birchwood to Fines with (2) 768.2 ACSS/TW (20/7) ""MAUMEE"" conductor 250 degrees C. | 43 to 44 Months | $35,735,843 | AG2-005, AG2-215, AG2-366, AG2-469, AG2-646, AH1-042, AH1-157, AH1-716 |
|
| Dominion | n7612 / dom-015-TC2 | Add a 4th 224 MVA 230/115 kV transformer at Suffolk substation and associated breakers (230 kV and 115 kV) | Dec 31 2028 | $10,061,347 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | n7615 / dom-187 | Wreck and rebuild 5.73 miles of 115 kV Line 44 between Myrtle and AD2-085 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 30 to 36 Months | $18,336,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | n7616 / dom-172 | Wreck and rebuild 0.13 miles of 115 kV Line 44 between Myrtle and AD2-085 with (1) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | 30 to 36 Months | $416,000 | AG2-426, AG2-427, AG2-428 |
|
| Dominion | n7643 / dom-480 | Add a 2nd new 224 MVA 115/230 kV Transformer at Chesterfield substation between Bus A and 115 kV station. | 42 to 48 Months | $11,000,000 | AG2-093, AG2-646 | AH1-324, AH1-717 |
| Dominion | n7675 / dom-393 | Wreck and rebuild 12.68 miles of 115 kV Line 98 between AD2-033 and Butcher Creek (AB2-060) with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C | 36 to 40 Months | $40,576,000 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-280, AH1-396 | AH1-215 |
| Dominion | n7685 / dom-283-TC2 | Rebuild 4.56 miles of 230 kV Line 2157 from Fredericksburg to Cranes Corner with (2) 768.2 ACSS/TW (20/7) ""MAUMEE"" conductor at 250 C and replace Line Lead at Cranes Corner. | 43 to 44 Months | $15,674,813 | AG2-320, AG2-436, AG2-469, AH1-528, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694 |
|
| Dominion | n7687 / dom-046-TC2 | Add a 3rd 230/115 kV transformer at Sedge Hill Substation and associated breakers (230 kV and 115 kV). | Jun 01 2029 | $10,595,849 | AG2-111, AG2-112, AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AG2-541, AH1-056, AH1-343, AH1-408 | AG2-262, AG2-522, AG2-659 |
| Dominion | n7698 / dom-394 | Rebuild 4.29 miles of 115 kV line 65 from AD2-074 Tap to AG1-135 Tap with single (1) 768.2 ACSS/TW (20/7) "Maumee" conductor. | 43 to 44 Months | $20,146,983 |
| AG2-005, AG2-366 |
| Dominion | n7796 / dom-302/3 | Wreck and rebuild 14.01 miles of 230 kV Line 2027 between Midlothian and Powhatan with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 42 to 48 Months | $53,238,000 | AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | n7827 / dom-454 | Wreck and rebuild 4.88 miles of 115 kV Line 154 between Madisonville DP and Pamplin with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 30 to 36 Months | $17,958,400 | AG2-440, AG2-441, AG2-442, AH1-215 |
|
| Dominion | n8238 / dom-294 | Wreck and rebuild 1.41 miles of 230 kV Line 217 between Charles City Road and Varina with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $5,358,000 | AG2-093, AG2-428, AG2-436, AG2-570, AG2-571, AH1-528 |
|
| Dominion | n8239 / dom-300 | Wreck and rebuild 8.84 miles of 230 kV Line 217 between Chesterfield and Varina with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 36 to 42 Months | $33,592,000 | AG2-093, AG2-428, AG2-436, AG2-570, AG2-571, AH1-528 |
|
| Dominion | n8243 / dom-389 | Wreck and rebuild 5.8 miles of 230 kV Line 2027 between AC2-165 (Sallee Creek) and Powhatan with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 36 to 42 Months | $22,040,000 | AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | n8256 / dom-277 | Wreck and rebuild 5.9 miles of 230 kV Line 2027 (future Line 2323) between Cartersville and AC2-165 (Sallee Creek) with (2) 768.2 ACSS/TW (20/7) "MAUMEE". | 36 to 42 Months | $22,420,000 | AG2-077, AG2-151, AG2-188, AG2-198, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | n8296 / dom-266 | Add a 2nd new 224 MVA 115/230 kV Transformer at Fork Union substation and add one (1) 115 kV breaker and one (1) 230 kV breaker | 42 to 48 Months | $17,500,000 | AG2-151, AG2-188, AG2-198, AG2-440, AG2-441, AG2-442, AG2-566, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-546, AH1-687 | AG2-077, AH1-170 |
| Dominion | n8423 / dom-119 | Wreck and rebuild 0.06 miles of 115 kV line 1016 between Woodchuck Trail and Crystal Hill DP with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C. | 30 to 36 Months | $192,000 | AG2-111, AG2-112, AG2-152, AG2-311, AG2-541, AH1-343 |
|
| Dominion | n9112.0 / TC1-PH2-DOM-063 | Wreck and Rebuild 12.4 miles of 230 kV line 259 with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Chesterfield. | 46 to 47 Months | $87,030,447 |
| AG2-088, AG2-093, AG2-270, AG2-428, AG2-436, AH1-528 |
| Dominion | n9132.0 / dom-122 | Add 3rd 138/115 kV transformer at Altavista substation | 42 to 44 Months | $11,000,000 | AG2-111, AG2-112, AG2-311, AH1-343 | AG2-077 |
| Dominion | n9136.0 / TC1-PH1-DOM-066 | Wreck and rebuild 1.32 miles of 115 kV line from Garner to AG1-135 with 768.2 aluminum conductor steel supported trapezoidal shaped aluminum strands ("ACSS/TW") (20/7). Replace line lead at Garner DP. | 42 to 43 Months | $8,145,385 |
| AG2-005, AG2-215, AG2-366 |
| Dominion | n9138.0 / TC1-PH1-DOM-070 | Wreck and rebuild 22.59 miles of Line #511 between Carson and Rawlings Substations with three (3) 1351 ACSS/TW and associated substation work. | 60 to 61 Months | $111,130,292 |
| AG2-069, AG2-077, AG2-339, AG2-436, AG2-570, AG2-581, AH1-528 |
| Dominion | n9139.0 / TC1-PH1-DOM-073 | Wreck and rebuild 37.41 miles of 500kV line 563 between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" and associated substation work. | 69 to 70 Months | $245,455,768 |
| AG2-436, AH1-528, AH1-712, AH1-716, AH1-723 |
| Dominion | n9145.0 / TC1-PH1-DOM-008 | Reconductor 0.11 miles of 115 kV line between Garner DP and Moon Corner with single (1) 768.2 aluminum conductor steel supported trapezoidal shaped aluminum strands ("ACSS/TW") (20/7). | 18 to 19 Months | $2,096,619 |
| AG2-005, AG2-215, AG2-366 |
| Dominion | n9146.0 / TC1-PH1-DOM-004 | Wreck and rebuild 1.51 miles of 115 kV Line No. 5 between Bremo and Fork Union with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees Celsius. Replace line lead at Bremo. | 42 to 43 Months | $7,535,533 |
| AG2-077, AG2-151, AG2-188, AG2-198, AG2-583, AH1-056, AH1-170, AH1-241, AH1-439, AH1-546, AH1-687 |
| Dominion | n9147.0 / TC1-PH1-DOM-011 | Wreck and rebuild 1.05 miles of 115 kV Line 153 between Locust Grove DP and Pine Glade with (1) 768.2 ACSS/TW (20/7) "MAUMEE". | 30 to 36 Months | $3,360,000 | AH1-676 |
|
| Dominion | n9148.0 / TC1-PH1-DOM-013-TC2 | Wreck and rebuild 5.63 miles of 115 kV line between Wan and White Marsh with (1) 768.2 ACSS/TW (20/7) ""MAUMEE"" conductor @ 250 degrees C. | 43 to 44 Months | $37,993,385 | AG2-005, AG2-366 |
|
| Dominion | n9150.0 / TC1-PH1-DOM-022 | Wreck and Rebuild 0.62 miles of 115 kV line 153 between Oak Green and Unionville Tap with (1) 768.2 ACSS/TW (20/7) "Maumee" conductor @ 250 degrees C. | 30 to 36 Months | $1,984,000 | AH1-676 |
|
| Dominion | n9151.0 / TC1-PH1-DOM-026 | Rebuild 0.76 miles of 115 kV line 93 between Southampton and Watkins Corner with single (1) 768.2 ACSS/TW (20/7) "Maumee" conductor. Replace line lead at Watkins Corner. | 42 to 43 Months | $4,174,356 |
| AG2-522, AH1-408 |
| Dominion | n9153.0 / TC1-PH1-DOM-043 | Wreck and rebuild 5.9 miles of 230 kV line 2128 between Fentress and Thrasher with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Fentress. | 43 to 44 Months | $33,297,247 |
| AH1-040 |
| Dominion | n9154.0 / TC1-PH1-DOM-025 | Replace switch 9369 at Watkins Corner 115 kV (Watkins Corner - Southampton). | 26 to 27 Months | $343,523 |
| AG2-522, AH1-408 |
| Dominion | n9191.0 / TC1-PH1-DOM-090 | Rebuild 41.13 miles of line 576 between North Anna and Midlothian with triple bundled (3) 1351.5 ACSR (45/7) "Dipper" conductor and associated substation work. | 74 to 75 Months | $256,706,175 |
| AG2-088, AG2-436, AH1-528, AH1-712, AH1-716, AH1-723 |
| Dominion | n9197.0 / TC1-PH2-DOM-001 | Wreck and rebuild 4.97 miles of 115 kV Line 153 between Locust Grove DP and Unionville Tap with (1) 768.2 ACSS/TW (20/7) "MAUMEE". | 30 to 36 Months | $15,904,000 | AH1-676 |
|
| Dominion | n9198.0 / TC1-PH2-DOM-003-TC2 | Replace Circuit Breaker 219322 and Circuit Breaker Lead at Bremo 230 kV (Bremo - Fork Union). | 40 to 41 Months | $2,113,879 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-241, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | n9199.0 / TC1-PH2-DOM-004 | Wreck and rebuild 1.63 miles of line 2193 between Fork Union and Bremo with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C and replace line lead at Bremo. | 42 to 43 Months | $7,947,612 |
| AG2-088, AG2-188, AG2-198, AG2-270, AG2-436, AG2-440, AG2-441, AG2-442, AG2-583, AH1-056, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
| Dominion | n9200.0 / TC1-PH2-DOM-005 | Rebuild 11.79 miles of line 238 between Sapony and Carson with twin bundled (2) 768.2 ACSS/TW (20/7) "Maumee" conductors. | 45 to 46 Months | $38,691,326 |
| AG2-077, AG2-270, AG2-522, AH1-408, AH1-528 |
| Dominion | n9201.0 / TC1-PH2-DOM-006 | Replace wave trap at Carson 230 kV (Carson - Sapony). | 14 to 15 Months | $521,941 |
| AG2-077, AG2-270, AG2-522, AH1-408, AH1-528 |
| Dominion | n9202.0 / TC1-PH2-DOM-007 | Replace Line Switch 23886 at Sapony 230 kV (Carson - Sapony). | 12 to 18 Months | $400,000 | AG2-077, AG2-270, AG2-382, AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-040, AH1-271, AH1-408, AH1-528 |
|
| Dominion | n9203.0 / TC1-PH2-DOM-008-TC2 | Wreck and rebuild 10.74 miles of line 2028 between Fork Union and Cunningham (Grape Vine) with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C. | 45 to 46 Months | $29,539,973 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | n9204.0 / TC1-PH2-DOM-014 | Wreck and rebuild 1.63 miles of line 238 between AE2-033 tap and Sapony with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor. | 42 to 43 Months | $6,764,273 |
| AG2-077, AG2-270, AG2-522, AH1-408, AH1-528 |
| Dominion | n9205.0 / TC1-PH2-DOM-015 | Replace Line Switch 23889 at Sapony 230 kV (Sapony - AE2-033 Tap) | 12 to 18 Months | $400,000 | AG2-077, AG2-270, AG2-382, AG2-440, AG2-441, AG2-442, AG2-522, AG2-659, AH1-040, AH1-271, AH1-408, AH1-528 |
|
| Dominion | n9208.0 / TC1-PH2-DOM-020 | Wreck and rebuild 6.87 miles of 115 kV Line 136 from Earleys to Ahoskie with single (1) 768.2 ACSS/TW (20/7) "Maumee" conductor. Replace line lead at Ahoskie. | 43 to 44 Months | $25,503,905 |
| AH1-091 |
| Dominion | n9215.0 / TC1-PH2-DOM-026 | Replace the Line Switch 9366 at Watkins 115 kV substation (Watkins - Franklin). | 12 to 18 Months | $300,000 | AG2-522, AG2-659, AH1-408 |
|
| Dominion | n9217.0 / TC1-PH2-DOM-028 | Wreck and rebuild 12.73 miles of 230 kV Line 298 from Buckingham to Farmville Substations with twin bundled (2) 768 ACSS/TW (20/7) "MAUMEE" conductor. | 45 to 46 Months | $40,414,822 |
| AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-436, AG2-440, AG2-441, AG2-442, AG2-581, AH1-056, AH1-377, AH1-439, AH1-528 |
| Dominion | n9220.0 / TC1-PH2-DOM-033 | Wreck and rebuild 15.42 miles of 230 kV Line #298 from Buckingham to Bremo Substations with twin bundled (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor. | 42 to 48 Months | $44,465,922 |
| AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-436, AG2-440, AG2-441, AG2-442, AG2-581, AH1-056, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546 |
| Dominion | n9221.0 / TC1-PH3-DOM-015-TC2 | Replace 230 kV Breaker 29822 at Bremo with a higher-rated device (Buckingham - Bremo). | 38 to 39 Months | $2,057,335 | AG2-068, AG2-069, AG2-077, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-341, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-522, AG2-541, AG2-566, AG2-570, AG2-571, AG2-581, AG2-659, AH1-056, AH1-215, AH1-314, AH1-343, AH1-377, AH1-408, AH1-439, AH1-528, AH1-546 |
|
| Dominion | n9222.0 / TC1-PH2-DOM-036-TC2 | Wreck and Rebuild 6.95 miles of 115 kV Line 89 from White Marsh to Hayes with (1) 768 ACSS/TW (20/7) ""Maumee"" conductor @ 250 degrees C. Replace Line Lead at Hayes. | 43 to 44 Months | $42,356,870 | AG2-005, AG2-366 |
|
| Dominion | n9248.0 / TC1-PH2-DOM-042 | Construct new 41.13 mile line between North Anna and Midlothian with (3) 1351.5 ACSS TW/HS285 (42/19) "MARTIN" at 145 degrees C. Station upgrades at North Anna and Midlothian to accommodate new line. | 48 to 60 Months | $345,766,000 | AG2-088, AG2-338, AG2-339, AG2-428, AG2-436, AG2-570, AG2-571, AH1-528, AH1-681, AH1-712, AH1-716, AH1-723 |
|
| Dominion | n9249.0 / TC1-PH2-DOM-043 | Construct new 37.26 mile line between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C. Station upgrades at Midlothian and Carson to accommodate new line. | 48 to 60 Months | $231,012,000 | AG2-068, AG2-069, AG2-077, AG2-369, AG2-436, AG2-440, AG2-441, AG2-442, AG2-570, AG2-571, AG2-581, AH1-528, AH1-681, AH1-712, AH1-716, AH1-723 |
|
| Dominion | n9250.0 / TC1-PH2-DOM-044 | Construct a new 22.59 mile line between Carson and Rawlings Substations. | 60 to 61 Months | $108,728,086 |
| AG2-069, AG2-077, AG2-339, AG2-436, AG2-570, AG2-581, AH1-528 |
| Dominion | n9252.0 / TC1-PH2-DOM-047 | Rebuild 3.81 miles of Line 2021 between Elizabeth City and Shawboro with double bundled (2) 768.2 ACSS/TW (20/7) "Maumee" conductor. | 15 to 16 Months | $12,801,638 |
| AG2-382, AH1-040, AH1-271 |
| Dominion | n9256.0 / TC1-PH2-DOM-049 | Re-conductor 5.8 mi of 230 kV underground cable 2119 from Garrisonville to Aquia Harbor with 2-5000 kcmil CU. | 36 to 42 Months | $116,000,000 | AG2-428, AG2-469, AH1-042, AH1-682, AH1-683, AH1-691, AH1-692, AH1-694 |
|
| Dominion | n9261.0 / TC1-PH2-DOM-060 | Replace Existing Chickahominy XFRM 1 with 3-480 MVA Single Phase XFRM. | 42 to 48 Months | $40,000,000 | AG2-010, AG2-428, AG2-436, AG2-570, AG2-571, AG2-646, AH1-040, AH1-042, AH1-157, AH1-216, AH1-528, AH1-717 |
|
| Dominion | n9264.0 / TC1-PH1-DOM-080 | Replace Line Lead at Surry for increased rating on Line 567 8SURRY 500 KV to 8CHCKAHM 500 KV ckt 1. | 12 to 13 Months | $582,006 |
| AG2-428, AG2-436, AH1-528, AH1-716 |
| Dominion | n9265.0 / TC1-PH2-DOM-064 | Replace 230 kV wave trap 259WT at Basin 230 kV (Basin - Chesterfield B). | 14 to 15 Months | $396,021 |
| AG2-088, AG2-093, AG2-270, AG2-428, AG2-436, AH1-528 |
| Dominion | n9266.0 / TC1-PH2-DOM-065 | Replace switches 25944 and 25945 at Basin 230 kV (Basin - Chesterfield B). | 38 to 39 Months | $701,120 |
| AG2-093, AG2-428, AG2-436, AH1-528 |
| Dominion | n9305.0 / TC1-PH2-DOM-037 | Replace existing 115/230 kV Transformers #4 and #5 and add two additional 115/230 kV transformers at Farmville Substation. Farmville Substation will be reconfigured as a breaker and a half. | 42 to 48 Months | $121,800,000 | AG2-171, AG2-213, AG2-341, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215, AH1-280, AH1-408 | AG2-522, AG2-566, AG2-659 |
| Dominion | n9376.0 / TC1-PH3-DOM-003-TC2 | Wreck and Rebuild 22.98 miles of 230 kV Line 235 from Briery to AG1-098 with (2) 768.2 ACSS/TW (20/7) ""MAUMEE"" at 250 C. | Dec 31 2029 | $69,323,785 | AG2-077, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-440, AG2-441, AG2-442, AG2-566, AG2-581, AG2-583, AH1-056, AH1-215, AH1-217, AH1-241, AH1-280, AH1-377, AH1-439, AH1-528, AH1-546, AH1-676, AH1-687 |
|
| Dominion | n9378.0 / TC1-PH3-DOM-010 | Replace existing 230/500 kV Carson transformer 2 with (4)-480 MVA single phase transformers. | Dec 31 2029 | $37,801,301 |
| AG2-069, AG2-077, AG2-270, AG2-339, AG2-436, AG2-570, AG2-581, AH1-528 |
| Dominion | n9379.0 / TC1-PH3-DOM-011 | Replace existing 230/500 kV Transformer 1 at Midlothian with (4)-480 MVA Single Phase transformers. | Dec 31 2029 | $37,836,293 |
| AG2-088, AG2-339, AG2-428, AG2-436, AG2-583, AH1-528 |
| Dominion | n9380.0 / TC1-PH3-DOM-012 | Replace existing Ladysmith 230/500 kV transformer 1 with four (4) 480 MVA single phase transformers. | Dec 31 2029 | $37,587,605 |
| AG2-208, AG2-320, AH1-683, AH1-691, AH1-692 |
| Dominion | n9643.0 / TC1-PH3-DOM-009-TC2 | Replace 795 AAC 37 line lead at Farmville 115 kV. | Mar 31 2027 | $391,643 | AG2-171, AG2-213, AG2-440, AG2-441, AG2-442, AH1-056, AH1-215 |
|
| Dominion | n9644.0 / TC1-PH3-DOM-006-TC2 | Upgrade a 2.73 mile segment of 230kV transmission line 2028 between Mt. Eagle and Grape Vine. This segment runs from Grape Vine substation to structure 2080/73. | Mar 31 2029 | $8,415,380 | AG2-068, AG2-069, AG2-077, AG2-088, AG2-151, AG2-171, AG2-188, AG2-198, AG2-213, AG2-270, AG2-338, AG2-339, AG2-369, AG2-428, AG2-436, AG2-440, AG2-441, AG2-442, AG2-566, AG2-570, AG2-571, AG2-581, AG2-583, AH1-056, AH1-217, AH1-241, AH1-377, AH1-439, AH1-528, AH1-546, AH1-687 |
|
| Dominion | n9651.0 / TC1-PH2-DOM-009 | Wreck and rebuild 10.05 miles of 115 kV Line 1059 between Northern Neck and Moon Corner with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 Deg. C. | Mar 31 2029 | $28,476,954 |
| AG2-005, AG2-124, AG2-215, AG2-366 |
| Dominion | n9652.0 / TC1-PH2-DOM-010 | Replace Wave Trap at Northern Neck for increased rating of Line 1059 between Northern Neck and Moon Corner | Mar 01 2027 | $1,065,776 |
| AG2-005, AG2-124, AG2-215, AG2-366 |
| Dominion | n9653.0 / TC1-PH2-DOM-011 | Replace Line Switch at Northern Neck for increased rating of Line 1059 between Northern Neck and Moon Corner | Mar 01 2027 | $454,326 |
| AG2-005, AG2-215, AG2-366 |
| Dominion | n9677.0 / dom-429 | Wreck and rebuild 0.95 miles of 115 kV Line 65 between Rappahannock and White Stone with (2) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C | 30 to 36 Months | $3,496,000 | AG2-005, AG2-366 |
|
| Dominion | s2705 | Wreck and rebuild approximately 12 miles of double circuit 230kV Line #252 and 115kV Line #29 from Aquia Harbour Switching Station to Possum Point. Upgrade station equipment. | Sep 25 2029 |
| AG2-320, AG2-436, AG2-469, AH1-042, AH1-528 | |
| EKPC | (Pending) / EKPC-tc-nu043 | AE2-254 POI (South Lancaster Substation)-Garrard County 69 kV Jumper Replacement #2 | 12 to 15 Months | $150,000 | AG2-179, AH1-427, AH1-721 |
|
| EKPC | (Pending) / EKPC-tc1-r0021a | Rebuild the AE2-254 POI (South Lancaster)-Garrard County 69 kV line (1.81 miles) using 954 MCM ACSR conductor. | 12 to 15 Months | $2,085,000 | AG2-179, AH1-427, AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu001 | Albany-Upchurch Tap 69 kV Line Section Rebuild (3.79 miles) | 12 to 20 Months | $6,035,000 | AH1-239 |
|
| EKPC | (Pending) / EKPC-tc2-nu002 | Albany-Upchurch Tap 69 kV Jumper Replacement | 9 to 15 Months | $105,000 | AH1-239 |
|
| EKPC | (Pending) / EKPC-tc2-nu003 | Cooper CCGT-Alcalde 161 kV Double-Circuit Line Addition | 22 to 36 Months | $15,730,000 | AG2-179, AG2-298, AG2-424, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu004 | Broughtontown Tap-Highland 69 kV Line Section Rebuild (3.70 miles) | 12 to 20 Months | $6,480,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu005 | Broughtontown Tap-Tommy Gooch 69 kV Line Section Rebuild (2.60 miles) | 12 to 17 Months | $4,555,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu006 | Broughtontown Tap-Tommy Gooch 69 kV Line Disconnect Upgrade | 12 to 20 Months | $220,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu007 | Charters-Rectorville 69 kV Line Conductor Temperature Upgrade (11.5 miles) | 12 to 21 Months | $650,000 | AH1-664, AH1-665 |
|
| EKPC | (Pending) / EKPC-tc2-nu008 | Cooper 161/69 kV Transformer Upgrade | 27 to 45 Months | $6,700,000 | AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu009 | Crooksville Tap (Madison County)-Crooksville 69 kV Line Rebuild | 15 to 22 Months | $7,480,000 | AG2-073 |
|
| EKPC | (Pending) / EKPC-tc2-nu010 | Summer Shade-Edmonton Industrial/JB Galloway Tap 69 kV Line Section Rebuild | 20 to 30 Months | $12,425,000 | AH1-034 |
|
| EKPC | (Pending) / EKPC-tc2-nu011 | Fox Hollow-Patton Road Junction 69 kV Line Rebuild | 13 to 20 Months | $5,795,000 | AG2-179, AG2-424, AG2-670, AH1-034, AH1-239, AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu012 | Highland-Mount Olive Junction 69 kV Line Rebuild (10.91 miles) | 21 to 34 Months | $19,105,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu013 | Highland-Mount Olive Junction 69 kV Line Disconnect Switch Upgrade | 12 to 20 Months | $220,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu014 | Green County-Summersville 69 kV Line Section Rebuild #2 (266.8 MCM ACSR section) | 12 to 18 Months | $265,000 | AG2-424 |
|
| EKPC | (Pending) / EKPC-tc2-nu016 | Laurel County 161/69 kV Transformer CT Upgrade | 12 to 15 Months | $35,000 | AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu017 | Liberty Junction-Mount Olive Junction 69 kV Line Section Rebuild (3.26 miles) | 12 to 19 Months | $5,710,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu018 | Liberty Junction-Mount Olive Junction 69 kV Jumper Replacement | 9 to 15 Months | $105,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu019 | Liberty Junction-Mount Olive Junction 69 kV Line Disconnect Switch Upgrade | 12 to 20 Months | $220,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu020 | Liberty Junction-Mount Olive Junction 69 kV Breaker CT Setting Upgrade | 9 to 12 Months | $10,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu021 | Loretto-AG2-298 Tap (West Marion County) 69 kV Line Conductor Temperature Upgrade (0.6 miles) | 12 to 15 Months | $35,000 | AG2-298, AG2-424 |
|
| EKPC | (Pending) / EKPC-tc2-nu022 | Patton Road Junction-AH1-034 Tap (East Barren County) 69 kV Line Section Rebuild (4.7 miles) | 15 to 23 Months | $8,965,000 | AG2-179, AH1-034, AH1-239, AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu023 | Patton Road Junction-AH1-034 Tap (East Barren County) 69 kV Line Disconnect Switch Upgrade | 12 to 20 Months | $220,000 | AH1-034 |
|
| EKPC | (Pending) / EKPC-tc2-nu024 | Plumville-Rectorville 69 kV Line Conductor Temperature Upgrade (2.9 miles) | 12 to 16 Months | $180,000 | AH1-664, AH1-665 |
|
| EKPC | (Pending) / EKPC-tc2-nu025 | Salem Tap-Webbs Crossroads Tap 69 kV Line Section Rebuild (2.7 miles) | 12 to 17 Months | $4,300,000 | AG2-179, AH1-034 |
|
| EKPC | (Pending) / EKPC-tc2-nu026 | Salem Tap-Windsor 69 kV Line Section Rebuild (5.31 miles) | 17 to 24 Months | $8,455,000 | AG2-179 | AH1-034 |
| EKPC | (Pending) / EKPC-tc2-nu027 | Sulphur Creek-AG2-298 Tap (West Marion County) 69 kV Line Section Rebuild (9.14 miles) | 22 to 31 Months | $14,555,000 | AG2-298 |
|
| EKPC | (Pending) / EKPC-tc2-nu028 | Summer Shade-Summer Shade Junction 69 kV Line Section Rebuild (0.15 miles) | 12 to 16 Months | $260,000 | AH1-034 |
|
| EKPC | (Pending) / EKPC-tc2-nu029 | Tommy Gooch Tap-AH1-427 Tap (North Lincoln County) 69 kV Line Section Rebuild (2.25 miles) | 12 to 16 Months | $4,335,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu030 | Tommy Gooch Tap-AH1-427 Tap 69 kV Line Disconnect Switch Upgrade | 12 to 20 Months | $220,000 | AH1-427 |
|
| EKPC | (Pending) / EKPC-tc2-nu031 | Upchurch Tap-AH1-239 Tap (Clinton County) 69 kV Line Section Rebuild (1.5 miles) | 12 to 18 Months | $2,390,000 | AH1-239, AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu032 | Wayne County-Zula Junction N.O. 69 kV Line Section Rebuild (0.78 miles) | 12 to 18 Months | $1,245,000 | AH1-034, AH1-239 |
|
| EKPC | (Pending) / EKPC-tc2-nu033 | Wayne County-Zula Junction N.O. 69 kV Jumper Replacement | 9 to 15 Months | $105,000 | AH1-034, AH1-239 |
|
| EKPC | (Pending) / EKPC-tc2-nu034 | Zula Junction N.O.-AG1-471 (Massingale Road) 69 kV Line Section Rebuild (0.6 miles) | 12 to 18 Months | $960,000 | AH1-034, AH1-239 |
|
| EKPC | (Pending) / EKPC-tc2-nu036 | AE2-071 Tap (Eighty Eight Substation)-Summer Shade Junction 69 kV Line Disconnect Switch Upgrade | 12 to 20 Months | $220,000 | AH1-034 |
|
| EKPC | (Pending) / EKPC-tc2-nu037 | AE2-071 Tap (Eighty Eight)-Summer Shade Junction 69 kV Line Section Rebuild (1.7 miles) with 954 ACSR Conductor | 12 to 15 Months | $3,130,000 | AH1-034 |
|
| EKPC | (Pending) / EKPC-tc2-nu038 | AE2-071 Tap (Eighty Eight Substation)-Summer Shade Junction 69 kV Zone 3 Relay Setting Increase | 9 to 12 Months | $10,000 | AH1-034 |
|
| EKPC | (Pending) / EKPC-tc2-nu040 | AE2-071 Tap (Eighty Eight)-AH1-034 Tap (East Barren County) 69 kV Line Section Rebuild (5.9 miles) with 795 ACSR Conductor | 15 to 22 Months | $9,870,000 | AH1-034 |
|
| EKPC | (Pending) / EKPC-tc2-nu041 | AE2-254 POI (South Lancaster Substation)-Garrard County 69 kV Breaker CT Upgrade | 12 to 15 Months | $100,000 | AG2-179, AH1-427, AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu042 | AE2-254 POI (South Lancaster Substation)-Garrard County 69 kV Jumper Replacement | 9 to 15 Months | $105,000 | AG2-179, AH1-427, AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu044 | Rebuild the AE2-254 POI (South Lancaster)-AH1-427 Tap (North Lincoln County) 69 kV line (3.34 miles) using 795 MCM ACSR conductor. | 16 to 20 Months | $3,465,000 | AG2-179, AH1-427, AH1-721 |
|
| EKPC | (Pending) / EKPC-tc2-nu045 | Rebuild the AF1-038 Tap (North Russell County)-Webbs Crossroads Tap 69 kV line (1.6 miles) using 556.5 MCM ACSR conductor. | 12 to 15 Months | $1,495,000 | AG2-179, AH1-034 |
|
| EKPC | (Pending) / EKPC-tc2-nu046 | Rebuild the AG1-471 Tap (Massingale Road)-AH1-239 Tap 69 kV line (Clinton County) (4.5 miles) using 556.5 MCM ACSR conductor. | 20 to 25 Months | $4,215,000 | AH1-239 |
|
| EKPC | (Pending) / EKPC-tc2-nu901 | Green County-Greensburg KU 69 kV Line Section EKPC Limit | 1 Months | $0 | AG2-424, AG2-670 |
|
| EKPC | (Pending) / r0067 | Replace the 500 MCM copper bus and jumpers at the Summer Shade substation using 750 MCM copper or equivalent | 12 to 15 Months | $125,000 | AH1-034 |
|
| EKPC | n6232.1 / EKPC-tc1-r0003b | Replace the 1200A interconnection metering CTs with 1600A equipment. | 12 to 15 Months | $345,000 | AG2-179, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721 |
|
| EKPC | n6460.3 | Rebuild the EKPC portion of the Longbranch-Mt. Zion 138 kV line section using 954 MCM ACSS conductor (3.7 miles). | 14 to 24 Months | $7,400,000 | AG2-073, AG2-081, AG2-159, AH1-004, AH1-664, AH1-665, AH1-666, AH1-721 | AH1-427 |
| EKPC | n6463.2 / EKPC-tc1-r0007b | Upgrade jumpers associated with Boone 138 kV bus using 2-500 MCM 37 CU conductor or equivalent | Jun 01 2022 |
| AG2-073, AG2-159, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721 | |
| EKPC | n6463.3 / EKPC-tc1-r0007a | Replace the 954 MCM ACSR line conductor in the Boone County-Longbranch 138 kV line with 795 MCM ACSS conductor (2.3 miles) | 11 to 19 Months | $5,400,000 | AG2-073, AG2-081, AG2-159, AH1-004, AH1-664, AH1-665, AH1-666, AH1-721 | AH1-427 |
| EKPC | n6480.1 / EKPC-tc1-r0002a | Rebuild the Plumville-Murphysville 69 kV line section using 556 MCM ACSR conductor at 212 degrees F (9.9 miles) | 22 to 34 Months | $15,610,000 | AH1-664, AH1-665, AH1-666 |
|
| EKPC | n6833.1 / EKPC-tc1-r0011a | Increase the maximum operating temperature of the 636 MCM ACSR conductor in the Casey County-Liberty Junction 161 kV line section to 176 degrees F. | 12 to 18 Months | $1,155,000 | AH1-721 | AG2-179, AH1-239 |
| EKPC | n6834.1 / EKPC-tc1-r0001a | Rebuild the 4/0 ACSR Green County-Summersville 69 kV line section (4.2 miles) using 556 MCM ACSR. | 18 to 24 Months | $5,585,000 | AG2-424, AG2-670, AH1-721 | AH1-034 |
| EKPC | n7771.1 / r0013 | Increase the maximum operating temperature of the Laurel County-Laurel Dam 161 kV line section 795 MCM conductor to 167 degrees F (~0.2 miles) | 6 Months | $35,000 | AG2-179, AH1-239, AH1-721 | AG2-670, AH1-034 |
| EKPC | n7771.2 / EKPC-tc1-r0014a | Increase the maximum operating temperature of the Laurel County-Laurel Dam 161 kV line section 795 MCM conductor to 212 degrees F (~4.47 miles) | 12 to 15 Months | $515,000 | AG2-179, AH1-239, AH1-721 | AG2-670, AH1-034 |
| EKPC | n7788.1 / r0071 | Rebuild the AE2-071-Summer Shade 69 kV line section using 795 MCM ACSR conductor at 212 degrees F (1.7 miles) | 8 to 12 Months | $2,708,000 |
| AH1-034 |
| EKPC | n8356 / r0050 | Increase the maximum operating temperature of the 4/0 ACSR conductor in the Patton Road Junction-Roseville Tap 69 kV line section to 212 degrees F (2.2 miles) | 10 Months | $150,000 | AH1-034 |
|
| EKPC | n8364.1 / EKPC-tc1-r0009b | Replace the 636 MCM ACSR conductor in the Marion County-KU Lebanon 138 kV line with 954 MCM ACSS conductor. | 21 to 27 Months | $200,000 | AG2-179, AG2-670, AH1-034, AH1-239, AH1-721 | AG2-424 |
| EKPC | n8368.2 / EKPC-tc1-r0012b | Rebuild the Cooper-Elihu 161 kV line section using 1272 MCM ACSS conductor (4.2 miles) | 16 to 27 Months | $10,335,000 | AG2-179, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721 |
|
| EKPC | n8368.3 / EKPC-tc1-r0012c | Change the Zone 3 relay setting at Elihu substation associated with the line protection to at least 383 MVA LTE rating. | 9 to 12 Months | $10,000 | AG2-179, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721 |
|
| EKPC | n8368.4 / EKPC-tc1-r0012d | Upgrade the existing 795 MCM ACSR jumpers at the Cooper substation associated with the Cooper-Elihu 161 kV line using bundled 500 MCM CU or equivalent | 9 to 12 Months | $35,000 | AG2-179, AG2-670, AH1-034, AH1-239, AH1-427, AH1-721 |
|
| EKPC | n8369 / EKPC-tc1-r0015a | Replace the existing Marion County 161/138 kV, 200 MVA transformer with a 300 MVA transformer. | 36 to 42 Months | $8,825,000 | AG2-179, AG2-670, AH1-034, AH1-239, AH1-721 | AG2-424 |
| EKPC | n9128.0 / EKPC-tc1-r0005c | Upgrade the 300A metering CTs at North Springfield with 800A metering CTs. | 12 to 15 Months | $370,000 | AG2-424, AG2-670, AH1-721 |
|
| EKPC | n9668.0 / r0004 | Increase the maximum operating temperature of the Summershade-Edm. JB Galloway Jct 69kV line section 266 MCM conductor to 212F (7.88 miles) | 12 to 15 Months | $420,000 | AH1-034, AH1-239 |
|
| EKPC | n9673.0 / EKPC-tc1-r0020b | Replace the 1500A interconnection metering CTs at Spurlock Station with 2000A equipment. | 18 to 21 Months | $1,295,000 | AG2-073, AG2-081, AH1-004, AH1-427, AH1-664, AH1-665, AH1-666, AH1-721 |
|
| EKPC | n9678.0 / EKPC-r0114a | Increase the maximum operating temperature of the 266 MCM ACSR conductor in the McKinney Corner Tap-Knob Lick 69 kV line section to 212 degrees F (12.53 miles) | 24 Months | $720,000 | AH1-034 |
|
| EKPC | s3165.0 / s3165 | Construct a new 161/13.8 kV distribution substation and associated 0.25 mile 161 kV double circuit tap line. | Jul 26 2024 |
| AH1-721 | |
| EKPC | s3169.0 / EKPC-tc1-r0005b | Rebuild the EKPC portion of the North Springfield-KU Springfield 69 kV line (2.6 mile) using 556 MCM ACSR conductor - Projected In-Service Date 6/1/2025 | TBD |
| AG2-424, AG2-670, AH1-427, AH1-721 | |
| EKPC | s3169.0 / s3169 | Rebuild the 14.11 mile, North Springfield-Loretto 69 kV line using 556.5 conductor and steel pole construction | TBD |
| AG2-298, AG2-424 | |
| EKPC | s3170.0 / s3170 | Rebuild the 4.4 mile, Snow Tap-North Albany 69 kV line using 556.5 conductor and steel pole construction. | Jun 01 2026 |
| AH1-239 | |
| EKPC | s3173.0 / S3173 | Rebuild the 16.3 mile, Duncannon Lane Tap-West Berea 69 KV line | Jul 12 2027 |
| AG2-073 | |
| LS Power | b3737.37 | Silver Run-Hope Creek 230kV Expansion (Projected ISD 6/1/2029) | Jun 01 2029 |
| AH1-260, AH1-710 | |
| ME | (Pending) / TC2-ME-001 | Rebuild 12.09 mi of the TMI – AE2-211_Tap 230 kV Line | 50 Months | $62,051,618 | AH1-695 |
|
| ME | (Pending) / TC2-ME-002 | Rebuild 5.95 mi of AE2-211_Tap - Jackson 230 kV Line | 32 Months | $29,829,326 | AH1-695 |
|
| OVEC | b3788.2 / B3788.2 | Replace limiting station elements at Kyger Creek | Jun 01 2028 |
| AG2-072, AG2-219, AG2-363, AG2-453, AH1-055, AH1-537, AH1-721 | |
| PECO | (Pending) / 220-97 Upgrades | Reinforcement for LINWOOD97 230 KV to POST97 230 KV ckt 1 | 48 Months | $19,750,000 | AG2-347, AH1-584, AH1-585, AH1-586, AH1-634 |
|
| PECO | (Pending) / Chichester1 | Chichester substation reinforcement | 24 to 36 Months | $750,000 | AG2-347, AH1-584, AH1-585, AH1-586, AH1-634 |
|
| PECO | b3737.23 | Rebuild the underground portion of Richmond-Waneeta 230 kV (Projected ISD 6/1/2029) | Jun 01 2029 |
| AG2-347, AH1-710 | |
| PECO | b3737.47 | Build New North Delta 500 kV substation (Four bay breaker and half configuration) | Oct 15 2027 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3737.50 | Bring the Peach Bottom-Delta Power Plant 500 kV line “in and out” of North Delta | Jun 01 2029 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3780.1 | Peach Bottom North upgrades – substation work (Projected ISD 12/31/2028) | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3780.14 | Reconfigure Cooper transmission feeds by establishing new Cooper-North Delta 230 kV line and rerouting existing transmissions lines by Cooper. | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3780.15 | Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3780.16 | Terminate new Cooper-North Delta 230 kV line (Transource Scope) at North Delta 230 kV | Oct 15 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3780.17 | Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub (Transource) | May 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3780.2 | Peach Bottom to Graceton (PECO Portion) – New 500kV Line | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.31 | Build new North Delta-High Ridge 500 kV line - PECO Portion (Projected ISD 12/1/2030) | Dec 01 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.35 | Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV (Projected ISD 12/1/2030) | Dec 01 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.42 | Peach Bottom 500kV North bus upgrade (Projected ISD 12/1/2030) | Dec 01 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.44 | North Delta termination for the North Delta-High Ridge 500 line (PECO work). | Dec 01 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.45 | North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (PECO work). | Dec 01 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.47 | Build new Peach Bottom South-North Delta 500 kV line (Projected ISD 12/1/2030) | Dec 01 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.48 | North Delta termination for the North Delta-High Ridge 500 line (Transource work). | Dec 15 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.49 | North Delta 500 kV termination for the Calpine generator (Calpine/Transource work). | Oct 06 2027 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.50 | North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (Transource work). | Jan 23 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.51 | North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (Transource work). | May 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3800.52 | Reconfigure Peach Bottom North and South 500 kV yards (Projected ISD 12/1/2030) | Dec 01 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PECO | b3907.2 | Rebuild Richmond - Waneeta 230 kV line | Jun 01 2029 |
| AG2-347, AH1-710 | |
| PECO | b3907.3 | Reconductor 2.12 miles of North Philadelphia to Waneeta 230 kV line including terminal equipment | Jun 01 2029 |
| AH1-710 | |
| PECO | n6471 / pe002 | Replace 1 piece of station cable in Richmond substation on Richmond-Camden tie line | 24 Months | $45,000 | AG2-347, AG2-616, AH1-584, AH1-585, AH1-586, AH1-634, AH1-641, AH1-710 |
|
| PECO | n6473 / pe003 | Replace reactor in Richmond substation on Richmond-Camden tie line | 36 Months | $2,254,000 | AG2-347, AG2-616, AH1-584, AH1-585, AH1-586, AH1-634, AH1-641, AH1-710 |
|
| PECO | n6474 / pe004 | Replace 2 circuit breakers in Richmond substation on Richmond-Camden tie line | 36 Months | $752,000 | AG2-347, AG2-616, AH1-584, AH1-585, AH1-586, AH1-634, AH1-641, AH1-710 |
|
| PECO | n7159 / pe023 | Reconductor 2 miles of 230 kV line from Chichester to Trainer with 2x1590 kcmil 54/19 ACSR and substation work at Chichester and Trainer. | Oct 31 2026 | $11,900,000 | AG2-347, AH1-584, AH1-585, AH1-586, AH1-634 |
|
| PECO | n7163 / pe022 | Rebuild 0.82 miles of 230 kV line from Trainer to Delco Tap with bundled 1590 kcmil 54/19 ACSR | 16 Months | $4,000,000 | AG2-347, AH1-584, AH1-585, AH1-586, AH1-634 |
|
| PECO | n7195 / pe025 | Rebuild 1.55 miles of 230 kV line from Linwood to Claymont with 2x1590 kcmil 54/19 ACSR | 36 Months | $4,500,000 | AG2-281, AG2-347, AH1-584, AH1-585, AH1-586, AH1-634, AH1-672, AH1-710 |
|
| PECO | n7866 / pe042 | Reconductor Linwood - Chichester 230 kV line. At Chichester: Upgrade #43 reactor. | Oct 31 2026 | $5,250,000 | AG2-347, AH1-584, AH1-585, AH1-586, AH1-634 |
|
| PECO | n9371.0 / PECO 220-85 | Install OPGW on PECO portion of EDGEMR 5 230.0 kV to LINWOOD85 230.0 kV ckt 1 | 36 to 60 Months | $232,164 |
| AG2-347 |
| PENELEC | (Pending) / PN-AF2-F-0017C | Replace line trap at Lewistown | 17 Months | $364,562 | AH1-313, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / PN-AF2-F-0039B | Rebuild 4.67 miles of the Penn Mar - High Point 115 kV Line. | 20 Months | $17,358,473 | AG2-411, AH1-201, AH1-203, AH1-205, AH1-460, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / PN-AG1-F-0011 | Reconductor 2.23 miles of the Farmers Valley-Piercebrook 115kV line | 19 Months | $8,857,754 | AH1-587 |
|
| PENELEC | (Pending) / TC2-PN-001.a | Replace 230 kV bus conductor at Shawville | 13 Months | $696,930 | AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / TC2-PN-001.b | Reconductor (Possible Rebuild) ~21.2 miles of Shawville-Shingletown 230kV transmission line. [PN side] | 73 Months | $107,340,814 | AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / TC2-PN-003.c | Replace substation conductor at Glade substation | 13 Months | $752,332 | AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / TC2-PN-005.a | Replace Sub conductor at Shelocta Substation (Homer City-Shelocta 230kV line terminal) | 13 Months | $869,783 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / TC2-PN-005.b | Adjust Relays at Shelocta Substation (Homer City-Shelocta 230kV line terminal) | 12 Months | $52,848 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / TC2-PN-006 | Replace Wave Trap at Shade Gap | 19 Months | $364,562 | AG2-418, AH1-313, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / TC2-PN-007.a | Adjust relay settings at Keystone and Shelocta | 11 Months | $103,523 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / TC2-PN-007.b | Replace line drops at Keystone Substation (Keystone-Shelocta 230kV line terminal) | 12 Months | $263,169 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / TC2-PN-009 | Reconductor 6.2 miles of 115 kV Line between AH1-587 and AE2-113 | 22 Months | $21,700,478 | AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AH1-313 |
| PENELEC | (Pending) / TC2-PN-010 | Reconductor FE owned 4.3 miles of Laurel Lake - Goudey (Oakdale) 115 kV Line | 20 Months | $16,174,322 | AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-588, AH1-589 |
|
| PENELEC | (Pending) / TC2-PN-011 | Replace 500/230 kV Conemaugh #3 Transformer | 66 Months | $28,558,871 | AG2-176, AG2-411, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n6816.1 | Rebuild 11.84 miles of the Lewistown - Reeds Gap Switching Station 115 kV Line | 28 Months | $39,212,597 | AH1-313, AH1-588, AH1-589 |
|
| PENELEC | n6816.2 | Rebuild 0.18 miles of line and replace line drop at Reed Gap Switching Station. | 18 Months | $1,716,483 | AH1-313, AH1-588, AH1-589 |
|
| PENELEC | n6817.1 | Rebuild 24.59 miles of the Lewistown-Juniata 230kV transmission line | 81 Months | $122,656,404 | AG2-176, AG2-418, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-203, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n6820.1 | Rebuild 22.36 miles of the Shade Gap to Reeds Gap Switching Station 115kV line | 36 Months | $70,047,107 | AG2-418, AH1-313, AH1-588, AH1-589 |
|
| PENELEC | n6820.2 | Rebuild 0.3 miles of line and replace line drop at Reed Gap Switching Station | 18 Months | $2,259,738 | AG2-418, AH1-313, AH1-588, AH1-589 |
|
| PENELEC | n6820.4 | Replace substation conductor at Shade Gap on the Shade Gap - Reeds Gap Switching Station 115 kV Line. | 14 Months | $453,060 | AG2-418, AH1-313, AH1-588, AH1-589 |
|
| PENELEC | n6855.1 | Replace substation conductor at Warren substation | 22 Months | $796,717 | AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n6855.2 | Rebuild 11.53 miles of transmission line between Warren and Glade. | 49 Months | $58,429,217 | AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n6855.3 | Replace line trap at Glade | 12 Months | $230,000 | AG2-456, AG2-457, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n6858.1 | Reconductor 1.76 miles of the Garrett - Penn Mar 115 kV line. | 37 Months | $6,867,997 | AG2-411, AH1-201, AH1-203, AH1-205, AH1-460, AH1-588, AH1-589 |
|
| PENELEC | n7114.1 | Reconductor 9.7 miles of 115 kV line between AH1-587 Tap and Farmers Valley | 25 Months | $34,336,933 | AH1-313, AH1-587 |
|
| PENELEC | n7114.2 | Replace substation conductor at Farmers Valley substation | 12 Months | $202,663 | AH1-313, AH1-587 |
|
| PENELEC | n7114.3 | Adjust line relaying at Farmers Valley substation | 12 Months | $52,848 | AH1-313, AH1-587 |
|
| PENELEC | n7641 | Reconductor 9.41 miles of transmission line. Replace line drops at Carlisle Pike substation. | 25 Months | $33,874,732 | AG2-418 |
|
| PENELEC | n7652 | Replace line trap at Shawville on the Shawville-Rockton Mountain 115kV line. | 19 Months | $364,562 | AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n7763.2 | Adjust relay settings at Roxbury 115kV Substation | 11 Months | $51,762 | AG2-418, AH1-313 |
|
| PENELEC | n8096 | Install an additional 230kV circuit breaker between the East Towanda 230kV line terminal and the North Meshoppen 230/115kV #4 transformer. | 45 Months | $1,621,562 | AG2-206, AG2-220, AG2-221, AG2-327, AG2-356, AG2-456, AG2-457, AH1-005, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589, AH1-720 | AH1-313 |
| PENELEC | n8229 | Reconductor 18.7 miles the AE2-113 (Farmers Valley) - Ridgway 115 kV Line | 32 Months | $62,172,697 | AG2-456, AG2-457, AH1-357, AH1-358, AH1-359, AH1-360, AH1-587, AH1-588, AH1-589 | AH1-313 |
| PENELEC | n8281 | Replace the Keystone #4 500/230 kV transformer with a larger unit and install a high side breaker | 67 Months | $31,322,503 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n8471 | East Sayre-North Waverly 115kV line upgrade - FirstEnergy (NYISO CY17 driven upgrade) | Nov 01 2027 |
| AG2-206, AG2-220, AG2-456, AG2-457, AG2-582, AH1-005, AH1-588, AH1-589, AH1-680, AH1-690, AH1-720 | |
| PENELEC | n9115.0 / PN-AF1-F-0022 | Replace substation conductor at the 115 kV tie at Shawville Substation | 14 Months | $509,322 |
| AG2-456, AG2-457, AH1-587, AH1-588, AH1-589, AH1-667 |
| PENELEC | n9116.0 / TC1-PN-001.d | Rebuild approximately 11 miles of the Homer City-Shelocta 230 kV line with double bundled 795 kcmil 26/7 ACSS conductor | 31 Months | $39,312,233 |
| AG2-176, AG2-411, AG2-456, AG2-457, AH1-102, AH1-203, AH1-460, AH1-587, AH1-588, AH1-589 |
| PENELEC | n9117.0 / TC1-PN-001.f | Replace disconnect switches at Homer City Substation (Homer City-Shelocta 230kV line terminal) | 24 Months | $1,254,760 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n9118.0 / TC1-PN-001.g | Replace disconnect switches and leads at Shelocta Substation (Homer City-Shelocta 230kV line terminal) | 26 Months | $1,783,345 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n9119.0 / TC1-PN-003.b | Reconductor/Rebuild the Shelocta – Keystone 230 kV Line, approximately 2.5 miles, with 1272 kcmil 45/7 ACSR 2-conductor | 23 Months | $9,533,592 |
| AG2-176, AG2-411, AG2-456, AG2-457, AH1-102, AH1-140, AH1-203, AH1-313, AH1-460, AH1-587, AH1-588, AH1-589 |
| PENELEC | n9120.0 / TC1-PN-003.c | Replace substation conductor at Keystone substation (Keystone-Shelocta 230kV line terminal) | 12 Months | $187,749 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n9121.0 / TC1-PN-003.d | Replace line drops at Keystone Substation (Keystone-Shelocta 230kV line terminal) | 11 Months | $257,762 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n9124.0 / TC1-PN-003.e | Replace bus conductor at Keystone Substation (Keystone-Shelocta 230kV line terminal) | 13 Months | $1,104,686 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n9125.0 / TC1-PN-003.f | Replace disconnect switches at Keystone Substation (Keystone-Shelocta 230kV line terminal) | 24 Months | $1,254,762 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n9126.0 / TC1-PN-003.h | Replace breaker leads at Keystone Substation (Keystone-Shelocta 230kV line terminal) | 12 Months | $152,770 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n9127.0 / TC1-PN-003.g | Replace disconnect switches and leads at Shelocta Substation (Keystone-Shelocta 230kV line terminal) | 26 Months | $1,783,345 | AG2-176, AG2-411, AG2-429, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-140, AH1-158, AH1-201, AH1-203, AH1-205, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PENELEC | n9225.0 / TC1-PN-001.e | Replace 230 kV substation conductor and line drops at Shelocta substation for the Homer City-Shelocta 230 kV line terminal | 13 Months | $107,569 |
| AG2-176, AG2-411, AG2-456, AG2-457, AH1-102, AH1-203, AH1-460, AH1-587, AH1-588, AH1-589 |
| PENELEC | s2764 / PN-2019-035 | Rebuild the Piney-Grandview-Titusville-Union City-Erie South 115 kV line using double circuit 115 kV construction | Jun 01 2034 |
| AG2-438, AH1-491 | |
| PENELEC | s3335.1 / PN-2024-007 | Replace Homer City South 345/230-23kV Transformer (Projected ISD 6/1/2027) | Jun 01 2027 |
| AG2-206, AG2-429, AG2-456, AG2-457, AH1-587, AH1-588, AH1-589 | |
| PEPCO | (Pending) / | TC2 Upgrade for BURCHES 500.0 kV to 8POSSUM 500.0 kV ckt 1 | 48 to 60 Months | $6,000,000 | AG2-436, AG2-570, AG2-571, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723 |
|
| PEPCO | (Pending) / | Additional Aspen to Dickerson H 230 kV line | 24 to 48 Months | $86,480,000 | AG2-304, AG2-436, AG2-570, AG2-571, AH1-528, AH1-676, AH1-681, AH1-712, AH1-723, AH1-727, AH1-729 |
|
| PEPCO | b3780.11 | Brighton Statcom and Capacitor (Projected ISD 12/31/2028) | Dec 31 2028 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PEPCO | b3800.243 | Rebuild 7.26 miles of existing 500 kV circuit from Dickerson Station H to Ed's Ferry | Dec 31 2030 |
| AH1-261 | |
| PEPCO | b3800.244 | Rebuild 7.26 miles of existing 230 kV circuit from Dickerson Station H to Ed's Ferry area to accommodate the new 500 kV circuit between Doubs and Aspen. (The 230kV portion of the project) | Dec 31 2030 |
| AG2-436, AG2-570, AH1-528, AH1-676, AH1-712, AH1-723, AH1-727 | |
| PEPCO | b3800.244 | Rebuild 7.26 miles of existing 230 kV circuit from Dickerson Station H to Ed's Ferry | Dec 31 2030 |
| AH1-261 | |
| PEPCO | b3800.245 | Reconfigure Dickerson H 230 kV Substation and upgrade terminal equipment. | Dec 31 2030 |
| AH1-261 | |
| PEPCO | b3800.40 | Conastone-Brighton 500 kV (5011 circuit) - Replace terminal equipment limitations at Brighton 500 kV. | Dec 31 2030 |
| AG2-347, AH1-695, AH1-710, AH1-725 | |
| PEPCO | b3800.46 | North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (PECO work). | Dec 01 2030 |
| AG2-166, AG2-206, AG2-220, AG2-347, AG2-450, AG2-451, AG2-532, AG2-533, AG2-534, AG2-535, AH1-260, AH1-261, AH1-587, AH1-588, AH1-589, AH1-695, AH1-710, AH1-725 | |
| PPL | b3774 | Reconductor/rebuild 0.64 miles of the PPL side of the Brunner Island - Yorkana 230 kV line (Projected ISD 6/1/2027) | Jun 01 2027 |
| AG2-166, AH1-695 | |
| PPL | n6818 | Rebuild PPL's ~0.9 miles LEWI-JUNI 230kV Line with a summer normal rating of at least 3000 Amps. | 24 Months | $3,600,000 | AG2-176, AG2-418, AG2-456, AG2-457, AH1-050, AH1-051, AH1-102, AH1-158, AH1-203, AH1-268, AH1-313, AH1-357, AH1-358, AH1-359, AH1-360, AH1-460, AH1-587, AH1-588, AH1-589 |
|
| PPL | n7111 / R-PL-0005 | Rebuild SUNB-ELIM 230kV line. | 48 Months | $77,100,000 | AG2-430, AH1-707 |
|
| PPL | n9114.0 / R-PL-0003 | Rebuild FRAC-SIEG 230kV Line | 72 Months | $120,600,000 | AG2-161, AG2-430, AH1-707 |
|
| PPL | s0945.1 | Rebuild the Juniata 230/69 kV Substation | Dec 31 2025 |
| AG2-176, AG2-456, AG2-457, AH1-102, AH1-313, AH1-587, AH1-588, AH1-589 | |
| PPL | s3528.4 | Susquehanna T10 Re-terminations | Jun 01 2027 |
| AG2-430, AH1-707 | |
| PSEG | (Pending) | Upgrade Linden to MinueSt Q-2348 230 kV | 30 Months | $9,183,000 | AH1-715, AH1-722 |
|
| PSEG | (Pending) | Upgrade Sewaren to MinueSt Q-2348 230 kV | 30 Months | $8,180,000 | AH1-715, AH1-722 |
|
| PSEG | (Pending) / PSEG-TC2-PHQ_LindenGen | Upgrade PSE&G portion of the Linden 230kV generator lead line | 24 Months | $3,708,000 | AH1-715, AH1-722 |
|
| PSEG | (Pending) / PSEG-TC2_PH1_LindenMinueR | Upgrade Linden to MinueSt R-2218 230 kV circuit | 30 Months | $9,000,000 | AH1-715, AH1-722 |
|
| PSEG | (Pending) / PSEG-TC2_PH1_MinueSewarenR | Upgrade Minue St to Sewaren R-2218 230kV circuit | 30 Months | $8,332,000 | AH1-715, AH1-722 |
|
Note: Additional detail can be found in each of the individual TC2 New Service Request System Impact Study reports also available on PJM.com.