AE2-291 Final System Impact Study (Retool 2) Report

v2.00 released 2026-05-14 11:47

Grit DP-Perth 115 kV

61.2 MW Capacity / 102.0 MW Energy

Introduction

This Final System Impact Study (SIS) Report has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 314 for New Service Requests (projects) in Transition Cycle 1 (TC1). The Project Developer/Eligible Customer (developer) is Hillandale Solar, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Virginia Electric and Power Company (d/b/a Dominion Energy Virginia).

Preface

The Final System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Final System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 5, Final Agreement Negotiation Phase, the purpose of the Final Agreement Negotiation Phase is to:

  1. Negotiate, execute and enter into the applicable final interconnection related service agreement found in Tariff, Part IX;
  2. Conduct any remaining analyses or updated analyses based on New Service Requests withdrawn during Decision Point III (DP3); and
  3. Adjust the security obligation based on New Service Requests withdrawn during Decision Point III and/or during the Final Agreement Negotiation Phase.
Retool 1:

In accordance with PJM Tariff Part VII.D 314 B(1)(a), Final Agreement Negotiation Phase:

  • PJM will perform a retool (Retool 1) after the conclusion of DP3 considering only the projects moving on in the Final Agreement Negotiation Phase (Removes DP3 withdrawals).
  • The Final System Impact Study reflecting results from the retooled analysis (Retool 1) will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • PJM will provide updated final electronic agreements to Project Developers and Eligible Customers in the Cycle reflecting updates from the Final System Impact Study after Retool 1 including the adjusted Security requirements.

The AE2-291 Final System Impact Study (Retool 1) Report is available for download here.

Retool 2 (if needed):

If particular New Service Requests do not sign their final agreements after receiving the updated information after Retool 1, there may be the need to run a second retool (Retool 2) to identify if any network upgrades are no longer necessary:

  • PJM will perform Retool 2 (if necessary) considering only the removal of projects from the model which chose not to execute their agreements after Retool 1.
  • The updated Final System Impact Study reflecting results from Retool 2 will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • If there are any adjustments to the agreements required after Retool 2, the necessary network upgrade or Security changes will be handled via the scope change process post-GIA.

General

The Project Developer has proposed a Solar generating facility located in the Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) zone — Pittsylvania County, Virginia. The installed facilities will have a total capability of 102.0 MW with 61.2 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AE2-291
Project Name:
Grit DP-Perth 115 kV
Project Developer Name:
Hillandale Solar, LLC
State:
Virginia
County:
Pittsylvania
Transmission Owner:
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
MFO:
102.0
MWE:
102.0
MWC:
61.2
Fuel Type:
Solar
Basecase Study Year:
2027

Physical Interconnection Facility Study

Received

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AE2-291 will interconnect with the Dominion’s Grit DP-Perth 115 kV transmission line through a new three breaker 115 kV switching station.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. The Facilities Studies for the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades were performed by the Transmission Owner in Phase II. Facilities Studies are available for download on PJM.com (see General Section for document links). The Interconnected Transmission Owner has performed a Facilities Study for the required System Reliability Network Upgrades in Phase III (see System Reinforcement Section for document links).

Based on the Final SIS results, the AE2-291 project has the following allocation of costs for interconnection. The Security amount required after the Final SIS and revised agreements is also shown below.

Cost Summary
DescriptionCost Allocated to AE2-291Cost Subject to Security*
Transmission Owner Interconnection Facilities (TOIF)$1,091,112$1,091,112
Other Scope$0$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$11,567,967$11,567,967
Network Upgrades$4,104,725$4,104,725
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$3,255,793$3,255,793
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violations$0$0
AFS - Non-PJM Violations$0 **$0 **
Total$20,019,597$20,019,597

* Contributes to calculation for Security. See Security Requirement Section of this report for additional detail.

** This value reflects the results at the time of the report posting and it is subject to change. AFS – Non-PJM Violations are not subject to Security. For latest AFS – Non-PJM Violations, please refer to the latest Affected System Study Report for your project.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Security Requirement

Per Tariff Part VII, Subpart D, section 314 (Final Agreement Negotiation Phase) A.1 and PJM Manual 14H, Section 5, if a Transition Cycle 1 New Service Request is withdrawn during Decision Point III and/or the Final Agreement Negotiation Phase, PJM shall remove the New Service Request from the Cycle and adjust the Security obligations of other New Service Requests based on the withdrawal. The Final System Impact Study results will reflect the updated Security amount for this project. Security may be in the form of cash, letter of credit, or other form of Security acceptable to PJM (see PJM M14H, Section 6.4).

Security is calculated for a New Service Request based on the Network Upgrade costs allocated pursuant to the Final System Impact Study results.

Note 1: "Network Upgrades" referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Security Due for AE2-291

Security has been calculated for the AE2-291 project(s) based on the Final System Impact Study results and is shown in the table below. This Security must be provided at Final SIS through either a wire transfer or letter of credit or other form of Security deemed acceptable by PJM per Manual 14H, Section 6.4.

Security Due for AE2-291
Project(s): AE2-291
Final Agreement Security (A): $20,019,597
Portion of Costs Already Paid (B): $0
Revised Net Security (C): A B = $20,019,597
Security on Hand with PJM (D): $20,019,597
Additional Security Due at Agreement Execution (E): C D = $0
Note:

In accordance with Tariff, Part VII, Subpart D, section 314(B)(4)(a) (Final Agreement Negotiation Phase) failure to provide any required adjustments to Security within the 15 Business Day period will result in the New Service Request project being terminated and withdrawn.

Please see the cover letter for more details on Letter of Credit/Wire details to satisfy the additional Security requirement.

If no additional Security is required, please coordinate with your assigned Project Manager to initiate any refunds of Security reductions.

Transmission Owner Scope of Work

The New Service Request Project will interconnect with the Dominion transmission system via a new three breaker ring bus switching station that connects on the Grit DP-Perth 115 kV Line 31. The required work for the interconnection of the New Service Request Project to the Dominion Transmission System is detailed in the following tables.

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Scope
Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
n9355.0

Remote Relay at Substation Altavista.

$119,401$28,809$22,814$5,080$176,104$176,104
n9354.0

Remote Relay at Substation Otter River.

$108,073$0$20,779$0$128,852$128,852
n9353.0

Remote Relay at Substation Perth.

$116,541$36,142$22,301$6,374$181,358$181,358
n9352.0

Re-arrange line #31 to loop into and out of the new three-breaker AE2-291 115 kV switching station.

$2,097,077$1,168,936$201,843$150,555$3,618,411$3,618,411
Stand-Alone Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
n9351.0

Build a new 115 kV three-breaker ring switching station located along VEPCO’s existing 115 kV, 31 line from Altavista Substation to Perth Substation.

$5,971,905$3,558,162$1,570,561$467,339$11,567,967$11,567,967
Transmission Owner Interconnection Facilities
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Install a 115 kV backbone structure with a line switch and foundation within the fence of the Interconnection Substation, to terminate the Project Developer’s generator lead line. Line conductor from the backbone structure to the bus position in the switchyard of the interconnection substation.

$636,537$257,162$165,330$32,083$1,091,112$1,091,112

Based on the scope of work for the Interconnection Facilities, it is expected to take 39 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase II of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

It is estimated to take 39 months to complete this work upon execution of the Generator Interconnection Agreement (GIA).This estimated time to complete is dependent on major equipment lead times. These preliminary cost estimates are based on typical engineering costs. A more detailed engineering cost estimates are normally done when the Project Developer provides an exact site plan location for the generation substation during a future study phase. As shown in the oneline diagram, this Interconnection Request is sharing the Point of Interconnection and Interconnection Facilities with one or more other Interconnection Requests. Should other requests withdraw from Transition Cycle 1, the cost allocation for Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and applicable Network Upgrades identified in the study report will be updated for the remaining project(s).   Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.
 
Remote Terminal Work: During Phase 2 of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Transmission Owner Analysis

PJM performed a power flow analysis of the transmission system using a 2027 load flow model and the results were verified by Dominion.

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. Dominion interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AE2-291 was evaluated as a 102.0 MW (61.2 MW Capacity) injection in the Dominion area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
SingleAC126.48 %245.0B309.8912.58
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Base Case
SingleAC123.38 %167.0A206.0412.87
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
AEP_P1-2_#311_5_SRT-A
SingleAC107.23 %245.0B262.7212.68
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
SingleAC127.99 %245.0B313.5812.58
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Base Case
SingleAC125.51 %167.0A209.5912.87
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
AEP_P1-2_#311_5_SRT-A
SingleAC108.71 %245.0B266.3512.68
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
SingleAC128.95 %245.0B315.9412.58
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Base Case
SingleAC126.83 %167.0A211.812.87
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
AEP_P1-2_#311_5_SRT-A
SingleAC109.65 %245.0B268.6412.68
GD1DVP
6BUCKING-6BREMO 230.0 kV Ckt 1 line
DVP_P4-2: 511T556_SRT-S-1
BreakerAC116.15 %699.0C811.9213.58
GD1DVP
6BUCKING-6BREMO 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
SingleAC112.88 %571.52B645.128.13
GD1DVP
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
DVP_P4-2: 511T556_SRT-S-1
BreakerAC117.22 %684.0C801.7913.59
GD1DVP
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
SingleAC113.89 %559.3B636.998.13

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:126.48 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:309.89
MW Contribution:12.58
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316003AC1-222 C
80/20
0.5490.549
24684405SMG2
80/20
2.8622.862
940081AE1-250 C
80/20
5.2055.205
3152661PLYWOOD A
80/20
0.4050.405
270197AC1-083 C
80/20
0.5590.559
316123AC1-075 C
80/20
1.1051.105
316205AC1-080 C
80/20
0.3690.369
942751AE2-291 C
80/20
12.5812.58
24684305SMG1
80/20
1.0391.039
3151561HALLBR1
80/20
2.6232.623
316197AC1-042 C
80/20
0.8870.887
24728405LEESVG
80/20
1.7261.726
942671AE2-283 C
80/20
9.5269.526
316248AF1-058 C
80/20
0.1210.121
941801AE2-185 C
80/20
12.24712.247
316118AC1-105 C
80/20
0.3030.303
24684505SMG3
80/20
1.7591.759
24684605SMG4
80/20
2.8622.862
24684705SMG5
80/20
1.0871.087
316217AC1-145 C
80/20
1.0561.056
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
NYPJM->LTFIMP_NY
CLTF
0.20.2
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
MECLTFEXP_MEC->PJM
CLTF
0.5260.526

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:123.38 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:206.04
MW Contribution:12.87
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316003AC1-222 C
80/20
0.5650.565
24684405SMG2
80/20
2.9182.918
940081AE1-250 C
80/20
5.1945.194
3152661PLYWOOD A
80/20
0.420.42
270197AC1-083 C
80/20
0.5650.565
316123AC1-075 C
80/20
1.1311.131
316205AC1-080 C
80/20
0.3780.378
942751AE2-291 C
80/20
12.8712.87
24684305SMG1
80/20
1.061.06
3151561HALLBR1
80/20
2.682.68
316197AC1-042 C
80/20
0.9050.905
24728405LEESVG
80/20
1.761.76
942671AE2-283 C
80/20
9.7139.713
316248AF1-058 C
80/20
0.1250.125
941801AE2-185 C
80/20
12.48912.489
316118AC1-105 C
80/20
0.3140.314
24684505SMG3
80/20
1.7941.794
24684605SMG4
80/20
2.9182.918
24684705SMG5
80/20
1.1091.109
316217AC1-145 C
80/20
1.0771.077
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
MDUPJM->LTFIMP_MDU
CLTF
00
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
NYPJM->LTFIMP_NY
CLTF
0.090.09
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o AEP_P1-2_#311_5_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#311_5_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.23 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:262.72
MW Contribution:12.68
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316003AC1-222 C
80/20
0.5530.553
24684405SMG2
80/20
2.8062.806
940081AE1-250 C
80/20
5.0765.076
3152661PLYWOOD A
80/20
0.4090.409
270197AC1-083 C
80/20
0.5470.547
316123AC1-075 C
80/20
1.1131.113
316205AC1-080 C
80/20
0.3720.372
942751AE2-291 C
80/20
12.67912.679
24684305SMG1
80/20
1.0191.019
3151561HALLBR1
80/20
2.6442.644
316197AC1-042 C
80/20
0.8930.893
24728405LEESVG
80/20
1.7271.727
942671AE2-283 C
80/20
9.5919.591
316248AF1-058 C
80/20
0.1220.122
941801AE2-185 C
80/20
12.33112.331
316118AC1-105 C
80/20
0.3060.306
24684505SMG3
80/20
1.7241.724
24684605SMG4
80/20
2.8062.806
24684705SMG5
80/20
1.0661.066
316217AC1-145 C
80/20
1.0631.063
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.9832.983
NYPJM->LTFIMP_NY
CLTF
0.1550.155
TVALTFEXP_TVA->PJM
CLTF
0.6380.638
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5820.582
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.29210.292
CPLELTFEXP_CPLE->PJM
CLTF
1.2211.221
SIGELTFEXP_SIGE->PJM
CLTF
0.0240.024
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.0630.063
LAGNLTFEXP_LAGN->PJM
CLTF
0.8020.802
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2962.296
LGEELTFEXP_LGEE->PJM
CLTF
0.1220.122
MECLTFEXP_MEC->PJM
CLTF
0.3910.391

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:127.99 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:313.58
MW Contribution:12.58
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316003AC1-222 C
80/20
0.5490.549
24684405SMG2
80/20
2.8622.862
940081AE1-250 C
80/20
5.2055.205
3152661PLYWOOD A
80/20
0.4050.405
270197AC1-083 C
80/20
0.5590.559
316123AC1-075 C
80/20
1.1051.105
316205AC1-080 C
80/20
0.3690.369
942751AE2-291 C
80/20
12.5812.58
24684305SMG1
80/20
1.0391.039
3151561HALLBR1
80/20
2.6232.623
316197AC1-042 C
80/20
0.8870.887
24728405LEESVG
80/20
1.7261.726
942671AE2-283 C
80/20
9.5269.526
316248AF1-058 C
80/20
0.1210.121
941801AE2-185 C
80/20
12.24712.247
316118AC1-105 C
80/20
0.3030.303
24684505SMG3
80/20
1.7591.759
24684605SMG4
80/20
2.8622.862
24684705SMG5
80/20
1.0871.087
316217AC1-145 C
80/20
1.0561.056
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
NYPJM->LTFIMP_NY
CLTF
0.20.2
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:125.51 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:209.59
MW Contribution:12.87
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316003AC1-222 C
80/20
0.5650.565
24684405SMG2
80/20
2.9182.918
940081AE1-250 C
80/20
5.1945.194
3152661PLYWOOD A
80/20
0.420.42
270197AC1-083 C
80/20
0.5650.565
316123AC1-075 C
80/20
1.1311.131
316205AC1-080 C
80/20
0.3780.378
942751AE2-291 C
80/20
12.8712.87
24684305SMG1
80/20
1.061.06
3151561HALLBR1
80/20
2.682.68
316197AC1-042 C
80/20
0.9050.905
24728405LEESVG
80/20
1.761.76
942671AE2-283 C
80/20
9.7139.713
316248AF1-058 C
80/20
0.1250.125
941801AE2-185 C
80/20
12.48912.489
316118AC1-105 C
80/20
0.3140.314
24684505SMG3
80/20
1.7941.794
24684605SMG4
80/20
2.9182.918
24684705SMG5
80/20
1.1091.109
316217AC1-145 C
80/20
1.0771.077
NYPJM->LTFIMP_NY
CLTF
0.090.09
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
MDUPJM->LTFIMP_MDU
CLTF
00
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o AEP_P1-2_#311_5_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#311_5_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:108.71 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:266.35
MW Contribution:12.68
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316003AC1-222 C
80/20
0.5530.553
24684405SMG2
80/20
2.8062.806
940081AE1-250 C
80/20
5.0765.076
3152661PLYWOOD A
80/20
0.4090.409
270197AC1-083 C
80/20
0.5470.547
316123AC1-075 C
80/20
1.1131.113
316205AC1-080 C
80/20
0.3720.372
942751AE2-291 C
80/20
12.67912.679
24684305SMG1
80/20
1.0191.019
3151561HALLBR1
80/20
2.6442.644
316197AC1-042 C
80/20
0.8930.893
24728405LEESVG
80/20
1.7271.727
942671AE2-283 C
80/20
9.5919.591
316248AF1-058 C
80/20
0.1220.122
941801AE2-185 C
80/20
12.33112.331
316118AC1-105 C
80/20
0.3060.306
24684505SMG3
80/20
1.7241.724
24684605SMG4
80/20
2.8062.806
24684705SMG5
80/20
1.0661.066
316217AC1-145 C
80/20
1.0631.063
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2962.296
LGEELTFEXP_LGEE->PJM
CLTF
0.1220.122
MECLTFEXP_MEC->PJM
CLTF
0.3910.391
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.9832.983
NYPJM->LTFIMP_NY
CLTF
0.1550.155
TVALTFEXP_TVA->PJM
CLTF
0.6380.638
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5820.582
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.29210.292
CPLELTFEXP_CPLE->PJM
CLTF
1.2211.221
SIGELTFEXP_SIGE->PJM
CLTF
0.0240.024
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.0630.063
LAGNLTFEXP_LAGN->PJM
CLTF
0.8020.802

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:128.95 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:315.94
MW Contribution:12.58
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316003AC1-222 C
80/20
0.5490.549
24684405SMG2
80/20
2.8622.862
940081AE1-250 C
80/20
5.2055.205
3152661PLYWOOD A
80/20
0.4050.405
270197AC1-083 C
80/20
0.5590.559
316205AC1-080 C
80/20
0.3690.369
316123AC1-075 C
80/20
1.1051.105
942751AE2-291 C
80/20
12.5812.58
3151561HALLBR1
80/20
2.6232.623
24684305SMG1
80/20
1.0391.039
316197AC1-042 C
80/20
0.8870.887
24728405LEESVG
80/20
1.7261.726
942671AE2-283 C
80/20
9.5269.526
316248AF1-058 C
80/20
0.1210.121
941801AE2-185 C
80/20
12.24712.247
316118AC1-105 C
80/20
0.3030.303
316217AC1-145 C
80/20
1.0561.056
24684605SMG4
80/20
2.8622.862
24684705SMG5
80/20
1.0871.087
24684505SMG3
80/20
1.7591.759
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
NYPJM->LTFIMP_NY
CLTF
0.20.2
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:126.83 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:211.8
MW Contribution:12.87
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316003AC1-222 C
80/20
0.5650.565
24684405SMG2
80/20
2.9182.918
940081AE1-250 C
80/20
5.1945.194
3152661PLYWOOD A
80/20
0.420.42
270197AC1-083 C
80/20
0.5650.565
316205AC1-080 C
80/20
0.3780.378
316123AC1-075 C
80/20
1.1311.131
942751AE2-291 C
80/20
12.8712.87
3151561HALLBR1
80/20
2.682.68
24684305SMG1
80/20
1.061.06
316197AC1-042 C
80/20
0.9050.905
24728405LEESVG
80/20
1.761.76
942671AE2-283 C
80/20
9.7139.713
316248AF1-058 C
80/20
0.1250.125
941801AE2-185 C
80/20
12.48912.489
316118AC1-105 C
80/20
0.3140.314
316217AC1-145 C
80/20
1.0771.077
24684605SMG4
80/20
2.9182.918
24684705SMG5
80/20
1.1091.109
24684505SMG3
80/20
1.7941.794
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
NYPJM->LTFIMP_NY
CLTF
0.090.09
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
MDUPJM->LTFIMP_MDU
CLTF
00

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o AEP_P1-2_#311_5_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#311_5_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:109.65 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:268.64
MW Contribution:12.68
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316003AC1-222 C
80/20
0.5530.553
24684405SMG2
80/20
2.8062.806
940081AE1-250 C
80/20
5.0765.076
3152661PLYWOOD A
80/20
0.4090.409
270197AC1-083 C
80/20
0.5470.547
316205AC1-080 C
80/20
0.3720.372
316123AC1-075 C
80/20
1.1131.113
942751AE2-291 C
80/20
12.67912.679
3151561HALLBR1
80/20
2.6442.644
24684305SMG1
80/20
1.0191.019
316197AC1-042 C
80/20
0.8930.893
24728405LEESVG
80/20
1.7271.727
942671AE2-283 C
80/20
9.5919.591
316248AF1-058 C
80/20
0.1220.122
941801AE2-185 C
80/20
12.33112.331
316118AC1-105 C
80/20
0.3060.306
316217AC1-145 C
80/20
1.0631.063
24684605SMG4
80/20
2.8062.806
24684705SMG5
80/20
1.0661.066
24684505SMG3
80/20
1.7241.724
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.9832.983
NYPJM->LTFIMP_NY
CLTF
0.1550.155
TVALTFEXP_TVA->PJM
CLTF
0.6380.638
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5820.582
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.29210.292
CPLELTFEXP_CPLE->PJM
CLTF
1.2211.221
SIGELTFEXP_SIGE->PJM
CLTF
0.0240.024
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.0630.063
LAGNLTFEXP_LAGN->PJM
CLTF
0.8020.802
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2962.296
LGEELTFEXP_LGEE->PJM
CLTF
0.1220.122
MECLTFEXP_MEC->PJM
CLTF
0.3910.391

Details for 6BUCKING-6BREMO 230.0 kV Ckt 1 line l/o DVP_P4-2: 511T556_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6BUCKING-6BREMO 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 511T556_SRT-S-1
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:116.15 %
Rating:699.0 MVA
Rating Type:C
MVA to Mitigate:811.92
MW Contribution:13.58
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6BUCKING-6BREMO 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 511T556_SRT-S-1
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:120.96 %
Rating:699.0 MVA
Rating Type:C
MVA to Mitigate:845.48
MW Contribution:13.85
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
924022AB2-043 E O1
Adder
9.122352941176477.754
3147223TWITTYS
50/50
2.1732.173
959312AF2-222 E
50/50
26.06826.068
926024AC1-080 E
Adder
1.09882352941176480.934
942462AE2-259 E
50/50
20.7620.76
964791AG1-342 C
Adder
5.5435294117647054.712
925997AC1-075 E
Adder
3.31294117647058832.816
937482AD2-202 E
Adder
1.86823529411764721.588
961792AG1-021 E
50/50
3.9843.984
941011AE2-092 C
Adder
-9.729411764705882-8.27
957481AF2-042 C
50/50
98.10798.107
924322AB2-079 E O1
Adder
2.3152941176470591.968
946302AF1-294 E
50/50
8.1418.141
943902AF1-058 E
Adder
1.841.564
925785AC1-054 E
Adder
3.35529411764705852.852
959311AF2-222 C
50/50
38.90838.908
942751AE2-291 C
Adder
8.1482352941176476.926
964242AG1-285 E
50/50
16.7716.77
924162AB2-060 E OP
Adder
7.6670588235294136.517
964792AG1-342 E
Adder
3.6952941176470593.141
932763AC2-100 E
Adder
2.72941176470588242.32
957482AF2-042 E
50/50
65.40565.405
934621AD1-088 C
50/50
18.90418.904
946301AF1-294 C
50/50
9.6139.613
942461AE2-259 C
50/50
31.1431.14
935172AD1-152 E
Adder
8.887.548
924302AB2-077 E O1
Adder
2.3152941176470591.968
942752AE2-291 E
Adder
5.4329411764705894.618
3147133PAMPLIN
50/50
2.7572.757
316322AB2-045 C
50/50
1.2941.294
927264AC1-222 E
Adder
5.52000000000000054.692
316336AC2-165 C
Adder
-5.905882352941176-5.02
934622AD1-088 E
50/50
9.1029.102
934612AD1-087 E
Adder
6.3835294117647065.426
927255AC1-221 E
Adder
4.1458823529411773.524
925612AC1-036 E
50/50
1.961.96
924312AB2-078 E O1
Adder
2.3152941176470591.968
926274AC1-105 E
Adder
4.0129411764705883.411
938821AE1-108 C
Adder
-10.607058823529412-9.016
964241AG1-285 C
50/50
25.15525.155
316034AC1-036 C
50/50
0.5350.535
958212AF2-115 E
50/50
4.984.98
962561AG1-105 C
Adder
14.18117647058823612.054
936261AD2-033 C
50/50
27.66927.669
3144293JTRSVLE
50/50
1.0761.076
961791AG1-021 C
50/50
4.6774.677
962562AG1-105 E
Adder
9.4541176470588238.036
924032AB2-045 E
50/50
5.85.8
3151531CLOVER1
50/50
22.49922.499
3138533PONTONDP
50/50
1.7321.732
936262AD2-033 E
50/50
18.44618.446
958211AF2-115 C
50/50
5.8465.846
CBM West 1LTFEXP_CBM-W1->PJM
CBM
9.3429.342
G-007PJM->LTFIMP_G-007
CMTX_NF
0.8050.805
CPLELTFEXP_CPLE->PJM
CLTF
4.5424.542
SIGELTFEXP_SIGE->PJM
CLTF
0.0740.074
CBM South 2LTFEXP_CBM-S2->PJM
CBM
36.04736.047
WECLTFEXP_WEC->PJM
CLTF
0.1940.194
LAGNLTFEXP_LAGN->PJM
CLTF
2.5782.578
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.3670.367
MECLTFEXP_MEC->PJM
CLTF
1.2261.226
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.1652.165
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.2887.288
NYPJM->LTFIMP_NY
CLTF
0.3840.384
TVALTFEXP_TVA->PJM
CLTF
2.0142.014
O66PJM->LTFIMP_O-066
CMTX_NF
5.1335.133

Details for 6BUCKING-6BREMO 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6BUCKING-6BREMO 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:112.88 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:645.12
MW Contribution:8.13
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6BUCKING-6BREMO 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:119.83 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:684.85
MW Contribution:8.28
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
966621AG1-532 C
80/20
0.7060.706
316003AC1-222 C
80/20
1.3481.348
936161AD2-022 C
80/20
3.6193.619
316210AC1-098 C
80/20
0.3390.339
316327AA2-057 C
80/20
0.4730.473
316239AB2-077 C O1
80/20
0.5670.567
935171AD1-152 C
80/20
2.1552.155
964791AG1-342 C
80/20
5.5355.535
932631AC2-084 C
80/20
0.3610.361
316274AC1-208 C
80/20
3.5413.541
3151311EDGECMA
80/20
5.0375.037
3151601KERR 3
80/20
1.5611.561
3151581KERR 1
80/20
0.5570.557
3152661PLYWOOD A
80/20
1.751.75
941011AE2-092 C
Adder
-9.714117647058824-8.257
313506AB1-173 C OP
80/20
0.5620.562
3151361ROSEMG1
80/20
0.6210.621
957481AF2-042 C
80/20
97.99997.999
3137643SOCKMAN
80/20
0.3520.352
316212AC1-099 C
80/20
0.1130.113
316319Z2-044 C
80/20
0.0740.074
937481AD2-202 C
80/20
0.6410.641
3151641KERR 7
80/20
1.5611.561
316205AC1-080 C
80/20
0.3190.319
316123AC1-075 C
80/20
0.9530.953
316011AB1-132 C OP
80/20
0.7050.705
316263AC1-034 C
80/20
2.2292.229
959311AF2-222 C
80/20
38.88338.883
942751AE2-291 C
80/20
8.1298.129
3151561HALLBR1
80/20
0.5580.558
316087AB2-174 C
80/20
0.5880.588
313527AB2-043 C
80/20
0.9080.908
3151591KERR 2
80/20
1.5611.561
316283AC2-100 C
80/20
1.2351.235
3156073AA1-063SOLA
80/20
0.5840.584
3151371ROSEMS1
80/20
0.3840.384
934621AD1-088 C
80/20
18.88618.886
316359AB2-059 C OP
80/20
0.5620.562
946301AF1-294 C
80/20
9.6099.609
942461AE2-259 C
80/20
31.13331.133
316197AC1-042 C
80/20
0.1420.142
3151411GASTONB
80/20
0.9230.923
3151261ROARAP2
80/20
0.6810.681
3147043LAWRENC
80/20
0.2660.266
3151621KERR 5
80/20
1.5611.561
316222AC1-221 C
80/20
1.5791.579
316322AB2-045 C
80/20
1.2941.294
316336AC2-165 C
Adder
-5.884705882352941-5.002
934611AD1-087 C
80/20
2.212.21
316049AB1-081 C OP
80/20
0.4770.477
3151611KERR 4
80/20
1.5611.561
316181AB2-040 GEN
80/20
0.6330.633
3156063AA2-053SOLA
80/20
0.6790.679
3151281ROARAP4
80/20
0.6440.644
316238AB2-078 C O1
80/20
0.5670.567
316237AB2-079 C O1
80/20
0.5670.567
938821AE1-108 C
Adder
-10.596470588235293-9.007
946281AF1-292 C
80/20
0.7790.779
926071AC1-086 C
80/20
6.3516.351
3151541CLOVER2
80/20
22.26122.261
964241AG1-285 C
80/20
25.13225.132
316034AC1-036 C
80/20
0.5340.534
962561AG1-105 C
80/20
14.16114.161
942671AE2-283 C
80/20
1.5211.521
960081AF2-299 C
80/20
0.9410.941
3151391GASTONA
80/20
0.9230.923
3151631KERR 6
80/20
1.5611.561
936261AD2-033 C
80/20
27.64927.649
3144293JTRSVLE
80/20
1.0761.076
961791AG1-021 C
80/20
4.6754.675
316248AF1-058 C
80/20
0.450.45
936171AD2-023 C
80/20
2.1112.111
941801AE2-185 C
80/20
1.9561.956
316129AC1-054 C
80/20
1.1891.189
3151531CLOVER1
80/20
22.47122.471
316131AB2-060 C
80/20
2.662.66
3138533PONTONDP
80/20
1.7311.731
316118AC1-105 C
80/20
1.3691.369
316217AC1-145 C
80/20
0.1690.169
3151381ROSEMG2
80/20
0.2910.291
934321AD1-056 C
80/20
1.9781.978
934331AD1-057 C
80/20
1.1031.103
958211AF2-115 C
80/20
5.8435.843
CBM South 2LTFEXP_CBM-S2->PJM
CBM
35.17235.172
CPLELTFEXP_CPLE->PJM
CLTF
4.444.44
SIGELTFEXP_SIGE->PJM
CLTF
0.0720.072
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.1880.188
LAGNLTFEXP_LAGN->PJM
CLTF
2.5082.508
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.0847.084
LGEELTFEXP_LGEE->PJM
CLTF
0.3550.355
MECLTFEXP_MEC->PJM
CLTF
1.1891.189
CBM West 1LTFEXP_CBM-W1->PJM
CBM
9.0479.047
NYPJM->LTFIMP_NY
CLTF
0.3750.375
TVALTFEXP_TVA->PJM
CLTF
1.9591.959
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.1162.116

Details for 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line l/o DVP_P4-2: 511T556_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 511T556_SRT-S-1
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:117.22 %
Rating:684.0 MVA
Rating Type:C
MVA to Mitigate:801.79
MW Contribution:13.59
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 511T556_SRT-S-1
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:121.59 %
Rating:684.0 MVA
Rating Type:C
MVA to Mitigate:831.68
MW Contribution:13.85
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
966621AG1-532 C
Adder
0.70470588235294120.599
924022AB2-043 E O1
Adder
9.1247058823529417.756
3147223TWITTYS
50/50
2.1732.173
959312AF2-222 E
50/50
26.07226.072
926024AC1-080 E
Adder
1.10.935
942462AE2-259 E
50/50
20.76320.763
964791AG1-342 C
Adder
5.5447058823529414.713
925997AC1-075 E
Adder
3.3141176470588242.817
937482AD2-202 E
Adder
1.86823529411764721.588
961792AG1-021 E
50/50
3.9843.984
941011AE2-092 C
Adder
-9.724705882352941-8.266
957481AF2-042 C
50/50
98.12598.125
924322AB2-079 E O1
Adder
2.3164705882352941.969
946302AF1-294 E
50/50
8.1428.142
943902AF1-058 E
Adder
1.841.564
3145723EMPORIA
Adder
0.21647058823529410.184
925785AC1-054 E
Adder
3.35647058823529452.853
959311AF2-222 C
50/50
38.91438.914
942751AE2-291 C
Adder
8.1517647058823536.929
964242AG1-285 E
50/50
16.77316.773
924162AB2-060 E OP
Adder
7.6694117647058836.519
964792AG1-342 E
Adder
3.6964705882352943.142
932763AC2-100 E
Adder
2.7305882352941182.321
957482AF2-042 E
50/50
65.41765.417
934621AD1-088 C
50/50
18.90718.907
946301AF1-294 C
50/50
9.6159.615
942461AE2-259 C
50/50
31.14431.144
935172AD1-152 E
Adder
8.8823529411764717.55
924302AB2-077 E O1
Adder
2.3164705882352941.969
942752AE2-291 E
Adder
5.4352941176470594.62
966622AG1-532 E
Adder
0.47058823529411770.4
3147133PAMPLIN
50/50
2.7572.757
927264AC1-222 E
Adder
5.5211764705882354.693
316336AC2-165 C
Adder
-5.9023529411764715-5.017
934622AD1-088 E
50/50
9.1039.103
934612AD1-087 E
Adder
6.3847058823529415.427
927255AC1-221 E
Adder
4.1470588235294123.525
925612AC1-036 E
50/50
1.961.96
924312AB2-078 E O1
Adder
2.3164705882352941.969
926274AC1-105 E
Adder
4.0141176470588233.412
938821AE1-108 C
Adder
-10.602352941176472-9.012
960082AF2-299 E
Adder
0.62705882352941180.533
946281AF1-292 C
Adder
0.77764705882352950.661
964241AG1-285 C
50/50
25.15925.159
316034AC1-036 C
50/50
0.5350.535
958212AF2-115 E
50/50
4.9814.981
962561AG1-105 C
Adder
14.18352941176470612.056
960081AF2-299 C
Adder
0.94000000000000010.799
936261AD2-033 C
50/50
27.67327.673
3144293JTRSVLE
50/50
1.0761.076
961791AG1-021 C
50/50
4.6774.677
962562AG1-105 E
Adder
9.4564705882352958.038
946282AF1-292 E
Adder
0.51882352941176470.441
3151531CLOVER1
50/50
22.50322.503
3138533PONTONDP
50/50
1.7321.732
936262AD2-033 E
50/50
18.44918.449
958211AF2-115 C
50/50
5.8475.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
36.10836.108
WECLTFEXP_WEC->PJM
CLTF
0.1960.196
LAGNLTFEXP_LAGN->PJM
CLTF
2.5882.588
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.370.37
MECLTFEXP_MEC->PJM
CLTF
1.2351.235
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.1672.167
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.3277.327
NYPJM->LTFIMP_NY
CLTF
0.3810.381
TVALTFEXP_TVA->PJM
CLTF
2.0222.022
O66PJM->LTFIMP_O-066
CMTX_NF
5.0935.093
CBM West 1LTFEXP_CBM-W1->PJM
CBM
9.4439.443
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7990.799
CPLELTFEXP_CPLE->PJM
CLTF
4.5484.548
SIGELTFEXP_SIGE->PJM
CLTF
0.0750.075

Details for 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:113.89 %
Rating:559.3 MVA
Rating Type:B
MVA to Mitigate:636.99
MW Contribution:8.13
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:120.98 %
Rating:559.3 MVA
Rating Type:B
MVA to Mitigate:676.62
MW Contribution:8.29
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
966621AG1-532 C
80/20
0.7060.706
316003AC1-222 C
80/20
1.3491.349
936161AD2-022 C
80/20
3.6223.622
316210AC1-098 C
80/20
0.3390.339
316327AA2-057 C
80/20
0.4730.473
316239AB2-077 C O1
80/20
0.5670.567
935171AD1-152 C
80/20
2.1562.156
964791AG1-342 C
80/20
5.5375.537
932631AC2-084 C
80/20
0.3610.361
316274AC1-208 C
80/20
3.5443.544
3151311EDGECMA
80/20
5.0435.043
3151601KERR 3
80/20
1.5621.562
3151581KERR 1
80/20
0.5580.558
3152661PLYWOOD A
80/20
1.751.75
941011AE2-092 C
Adder
-9.709411764705882-8.253
313506AB1-173 C OP
80/20
0.5620.562
3151361ROSEMG1
80/20
0.6210.621
957481AF2-042 C
80/20
98.01698.016
3137643SOCKMAN
80/20
0.3530.353
316212AC1-099 C
80/20
0.1140.114
316319Z2-044 C
80/20
0.0740.074
937481AD2-202 C
80/20
0.6410.641
3151641KERR 7
80/20
1.5621.562
316205AC1-080 C
80/20
0.3190.319
316123AC1-075 C
80/20
0.9540.954
316011AB1-132 C OP
80/20
0.7060.706
316263AC1-034 C
80/20
2.2322.232
959311AF2-222 C
80/20
38.88938.889
942751AE2-291 C
80/20
8.1328.132
3151561HALLBR1
80/20
0.5580.558
316087AB2-174 C
80/20
0.5890.589
313527AB2-043 C
80/20
0.9080.908
3151591KERR 2
80/20
1.5621.562
316283AC2-100 C
80/20
1.2351.235
3156073AA1-063SOLA
80/20
0.5850.585
3151371ROSEMS1
80/20
0.3850.385
934621AD1-088 C
80/20
18.88918.889
316359AB2-059 C OP
80/20
0.5630.563
946301AF1-294 C
80/20
9.619.61
942461AE2-259 C
80/20
31.13731.137
316197AC1-042 C
80/20
0.1420.142
3151411GASTONB
80/20
0.9240.924
3151261ROARAP2
80/20
0.6820.682
3147043LAWRENC
80/20
0.2660.266
3151621KERR 5
80/20
1.5621.562
316222AC1-221 C
80/20
1.581.58
316336AC2-165 C
Adder
-5.881176470588235-4.999
934611AD1-087 C
80/20
2.212.21
316049AB1-081 C OP
80/20
0.4780.478
3151611KERR 4
80/20
1.5621.562
316181AB2-040 GEN
80/20
0.6330.633
3156063AA2-053SOLA
80/20
0.680.68
3151281ROARAP4
80/20
0.6450.645
316238AB2-078 C O1
80/20
0.5670.567
316237AB2-079 C O1
80/20
0.5670.567
938821AE1-108 C
Adder
-10.591764705882353-9.003
946281AF1-292 C
80/20
0.7790.779
926071AC1-086 C
80/20
6.3586.358
3151541CLOVER2
80/20
22.26622.266
964241AG1-285 C
80/20
25.13725.137
316034AC1-036 C
80/20
0.5340.534
962561AG1-105 C
80/20
14.16414.164
942671AE2-283 C
80/20
1.5231.523
960081AF2-299 C
80/20
0.9420.942
3151391GASTONA
80/20
0.9240.924
3151631KERR 6
80/20
1.5621.562
936261AD2-033 C
80/20
27.65427.654
3144293JTRSVLE
80/20
1.0761.076
961791AG1-021 C
80/20
4.6754.675
316248AF1-058 C
80/20
0.450.45
936171AD2-023 C
80/20
2.1132.113
941801AE2-185 C
80/20
1.9581.958
316129AC1-054 C
80/20
1.1891.189
3151531CLOVER1
80/20
22.47622.476
316131AB2-060 C
80/20
2.6612.661
3138533PONTONDP
80/20
1.7321.732
316118AC1-105 C
80/20
1.3691.369
316217AC1-145 C
80/20
0.1690.169
3151381ROSEMG2
80/20
0.2910.291
934321AD1-056 C
80/20
1.981.98
934331AD1-057 C
80/20
1.1051.105
958211AF2-115 C
80/20
5.8445.844
CBM West 1LTFEXP_CBM-W1->PJM
CBM
9.1489.148
NYPJM->LTFIMP_NY
CLTF
0.3720.372
TVALTFEXP_TVA->PJM
CLTF
1.9681.968
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.1192.119
CBM South 2LTFEXP_CBM-S2->PJM
CBM
35.23335.233
CPLELTFEXP_CPLE->PJM
CLTF
4.4464.446
SIGELTFEXP_SIGE->PJM
CLTF
0.0720.072
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.190.19
LAGNLTFEXP_LAGN->PJM
CLTF
2.5182.518
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.1237.123
LGEELTFEXP_LGEE->PJM
CLTF
0.3590.359
MECLTFEXP_MEC->PJM
CLTF
1.1991.199
CONTINGENCY 'AEP_P1-2_#3174_6_SRT-A'
 OPEN BRANCH FROM BUS 242512 TO BUS 242515 CKT 1   /*05CLOVRD     765.0 - 05JOSHUA     765.0
END
CONTINGENCY 'AEP_P1-2_#311_5_SRT-A'
 OPEN BRANCH FROM BUS 242512 TO BUS 242514 CKT 1   /*05CLOVRD     765.0 - 05J.FERR     765.0
END
CONTINGENCY 'DVP_P4-2: 511T556_SRT-S-1'
 OPEN BRANCH FROM BUS 313995 TO BUS 314936 CKT 1                /*8FINNEYWOOD  500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314936 CKT 1                /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
CONTINGENCY 'DVP_P1-2: LN 556_SRT-S-3'
 OPEN BRANCH FROM BUS 313995 TO BUS 314936 CKT 1                /*8FINNEYWOOD  500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
242687 to 242734 ckt 1
242741 to 242687 ckt 1
314667 to 242741 ckt 1
314677 to 314747 ckt 1
314692 to 314677 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1DVP
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 585_SRT-A-1
SingleAC106.7 %4070.2B4342.9813.51
GD1DVP
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 585_SRT-A-2
SingleAC102.59 %4070.2B4175.6213.51
GD1DVP
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 511_SRT-S
SingleAC104.04 %4070.2B4234.712.11

Details for 8RAWLINGS-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 585_SRT-A-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 585_SRT-A-1
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:106.7 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4342.98
MW Contribution:13.51
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
3151601KERR 3
80/20
1.8191.819
3151581KERR 1
80/20
0.650.65
935171AD1-152 C
80/20
3.2243.224
936161AD2-022 C
80/20
12.80112.801
270197AC1-083 C
80/20
0.9970.997
3151041BRUNSWICKG3
80/20
25.36925.369
316239AB2-077 C O1
80/20
0.5160.516
964791AG1-342 C
80/20
6.5026.502
940081AE1-250 C
80/20
13.65313.653
957601AF2-054 C
Adder
-1.8941176470588237-1.61
3151311EDGECMA
80/20
10.35810.358
3152661PLYWOOD A
80/20
2.3542.354
3151021BRUNSWICKG1
80/20
25.36925.369
957481AF2-042 C
80/20
148.174148.174
316003AC1-222 C
80/20
1.9581.958
24684405SMG2
80/20
3.2353.235
940601AE2-047 C
80/20
4.254.25
944641AF1-129 C
Adder
-95.19529411764705-80.916
316240AF1-291 C
Adder
-2.031764705882353-1.727
316263AC1-034 C
80/20
4.5164.516
937481AD2-202 C
80/20
0.9380.938
3151591KERR 2
80/20
1.8191.819
959311AF2-222 C
80/20
25.13225.132
316205AC1-080 C
80/20
0.5050.505
316123AC1-075 C
80/20
1.5121.512
942751AE2-291 C
80/20
13.51213.512
3151561HALLBR1
80/20
1.2391.239
24684305SMG1
80/20
1.1751.175
933291AC2-141 C
Adder
-33.98823529411765-28.89
3151641KERR 7
80/20
1.8191.819
313527AB2-043 C
80/20
0.8060.806
942001AE2-212 C
Adder
-2.1176470588235294-1.8
3151031BRUNSWICKG2
80/20
25.36925.369
316359AB2-059 C OP
80/20
1.1351.135
934621AD1-088 C
80/20
24.38424.384
946301AF1-294 C
80/20
5.4265.426
942461AE2-259 C
80/20
14.02314.023
316283AC2-100 C
80/20
2.3262.326
316197AC1-042 C
80/20
0.3460.346
938531AE1-072 C
Adder
-16.896470588235296-14.362
316049AB1-081 C OP
80/20
0.9630.963
316238AB2-078 C O1
80/20
0.5160.516
316322AB2-045 C
80/20
0.2670.267
3152421Z1-086 GT2
80/20
32.07932.079
3152441Z1-086 ST
80/20
55.85555.855
3152411Z1-086 GT1
80/20
32.08832.088
940641AE2-051 C
Adder
-22.240000000000002-18.904
3152431Z1-086 GT3
80/20
32.07932.079
934611AD1-087 C
80/20
3.2323.232
3151611KERR 4
80/20
1.8191.819
3151621KERR 5
80/20
1.8191.819
316237AB2-079 C O1
80/20
0.5160.516
316222AC1-221 C
80/20
2.9052.905
24728405LEESVG
80/20
0.9740.974
964241AG1-285 C
80/20
19.39519.395
316034AC1-036 C
80/20
0.3540.354
962561AG1-105 C
80/20
15.92115.921
316118AC1-105 C
80/20
1.7691.769
3144293JTRSVLE
80/20
0.6050.605
316217AC1-145 C
80/20
0.4120.412
942671AE2-283 C
80/20
3.7323.732
943811AF1-049 C
80/20
9.4269.426
938741AE1-100 C
80/20
0.7290.729
941671AE2-166 C
80/20
5.7085.708
944011AF1-069 C
80/20
38.91238.912
963041AG1-153 C
80/20
17.24617.246
3151051BRUNSWICKS1
80/20
52.70552.705
936261AD2-033 C
80/20
19.83719.837
961791AG1-021 C
80/20
2.642.64
316248AF1-058 C
80/20
0.6420.642
936171AD2-023 C
80/20
7.4677.467
941801AE2-185 C
80/20
4.7984.798
316129AC1-054 C
80/20
1.1861.186
3151631KERR 6
80/20
1.8191.819
316131AB2-060 C
80/20
2.3152.315
3138533PONTONDP
80/20
0.9780.978
24684505SMG3
80/20
1.9881.988
24684705SMG5
80/20
1.2291.229
941431AE2-140 C
80/20
14.14314.143
941031AE2-094 C
80/20
119.094119.094
3151531CLOVER1
80/20
32.84832.848
3151541CLOVER2
80/20
32.5432.54
958211AF2-115 C
80/20
3.33.3
24684605SMG4
80/20
3.2353.235
964211AG1-282 C
Adder
-1.7882352941176471-1.52
CBM South 2LTFEXP_CBM-S2->PJM
CBM
177.277177.277
CPLELTFEXP_CPLE->PJM
CLTF
20.16220.162
SIGELTFEXP_SIGE->PJM
CLTF
0.550.55
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
1.5251.525
LAGNLTFEXP_LAGN->PJM
CLTF
15.4915.49
CBM West 2LTFEXP_CBM-W2->PJM
CBM
46.81246.812
LGEELTFEXP_LGEE->PJM
CLTF
2.8852.885
MECLTFEXP_MEC->PJM
CLTF
8.7578.757
CBM West 1LTFEXP_CBM-W1->PJM
CBM
74.77474.774
NYPJM->LTFIMP_NY
CLTF
2.1882.188
TVALTFEXP_TVA->PJM
CLTF
12.22612.226
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.6199.619

Details for 8RAWLINGS-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 585_SRT-A-2


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 585_SRT-A-2
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:102.59 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4175.62
MW Contribution:13.51
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
3151601KERR 3
80/20
1.8191.819
3151581KERR 1
80/20
0.650.65
935171AD1-152 C
80/20
3.2243.224
936161AD2-022 C
80/20
12.80112.801
270197AC1-083 C
80/20
0.9970.997
3151041BRUNSWICKG3
80/20
25.36925.369
316239AB2-077 C O1
80/20
0.5160.516
964791AG1-342 C
80/20
6.5026.502
940081AE1-250 C
80/20
13.65313.653
957601AF2-054 C
Adder
-1.8941176470588237-1.61
3151311EDGECMA
80/20
10.35810.358
3152661PLYWOOD A
80/20
2.3542.354
3151021BRUNSWICKG1
80/20
25.36925.369
957481AF2-042 C
80/20
148.174148.174
316003AC1-222 C
80/20
1.9581.958
24684405SMG2
80/20
3.2353.235
940601AE2-047 C
80/20
4.254.25
944641AF1-129 C
Adder
-95.19529411764705-80.916
316240AF1-291 C
Adder
-2.031764705882353-1.727
316263AC1-034 C
80/20
4.5164.516
937481AD2-202 C
80/20
0.9380.938
3151591KERR 2
80/20
1.8191.819
959311AF2-222 C
80/20
25.13225.132
316205AC1-080 C
80/20
0.5050.505
316123AC1-075 C
80/20
1.5121.512
942751AE2-291 C
80/20
13.51213.512
3151561HALLBR1
80/20
1.2391.239
24684305SMG1
80/20
1.1751.175
933291AC2-141 C
Adder
-33.98823529411765-28.89
3151641KERR 7
80/20
1.8191.819
313527AB2-043 C
80/20
0.8060.806
942001AE2-212 C
Adder
-2.1176470588235294-1.8
3151031BRUNSWICKG2
80/20
25.36925.369
316359AB2-059 C OP
80/20
1.1351.135
934621AD1-088 C
80/20
24.38424.384
946301AF1-294 C
80/20
5.4265.426
942461AE2-259 C
80/20
14.02314.023
316283AC2-100 C
80/20
2.3262.326
316197AC1-042 C
80/20
0.3460.346
938531AE1-072 C
Adder
-16.896470588235296-14.362
316049AB1-081 C OP
80/20
0.9630.963
316238AB2-078 C O1
80/20
0.5160.516
316322AB2-045 C
80/20
0.2670.267
3152421Z1-086 GT2
80/20
32.07932.079
3152441Z1-086 ST
80/20
55.85555.855
3152411Z1-086 GT1
80/20
32.08832.088
940641AE2-051 C
Adder
-22.240000000000002-18.904
3152431Z1-086 GT3
80/20
32.07932.079
934611AD1-087 C
80/20
3.2323.232
3151611KERR 4
80/20
1.8191.819
3151621KERR 5
80/20
1.8191.819
316237AB2-079 C O1
80/20
0.5160.516
316222AC1-221 C
80/20
2.9052.905
24728405LEESVG
80/20
0.9740.974
964241AG1-285 C
80/20
19.39519.395
316034AC1-036 C
80/20
0.3540.354
962561AG1-105 C
80/20
15.92115.921
316118AC1-105 C
80/20
1.7691.769
3144293JTRSVLE
80/20
0.6050.605
316217AC1-145 C
80/20
0.4120.412
942671AE2-283 C
80/20
3.7323.732
943811AF1-049 C
80/20
9.4269.426
938741AE1-100 C
80/20
0.7290.729
941671AE2-166 C
80/20
5.7085.708
963041AG1-153 C
80/20
17.24617.246
3151051BRUNSWICKS1
80/20
52.70552.705
936261AD2-033 C
80/20
19.83719.837
961791AG1-021 C
80/20
2.642.64
316248AF1-058 C
80/20
0.6420.642
936171AD2-023 C
80/20
7.4677.467
941801AE2-185 C
80/20
4.7984.798
316129AC1-054 C
80/20
1.1861.186
3151631KERR 6
80/20
1.8191.819
316131AB2-060 C
80/20
2.3152.315
3138533PONTONDP
80/20
0.9780.978
24684505SMG3
80/20
1.9881.988
24684705SMG5
80/20
1.2291.229
941431AE2-140 C
80/20
14.14314.143
3151531CLOVER1
80/20
32.84832.848
3151541CLOVER2
80/20
32.5432.54
958211AF2-115 C
80/20
3.33.3
24684605SMG4
80/20
3.2353.235
964211AG1-282 C
Adder
-1.7882352941176471-1.52
CBM West 2LTFEXP_CBM-W2->PJM
CBM
46.81246.812
LGEELTFEXP_LGEE->PJM
CLTF
2.8852.885
MECLTFEXP_MEC->PJM
CLTF
8.7578.757
CBM West 1LTFEXP_CBM-W1->PJM
CBM
74.77474.774
NYPJM->LTFIMP_NY
CLTF
2.1882.188
TVALTFEXP_TVA->PJM
CLTF
12.22612.226
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.6199.619
CBM South 2LTFEXP_CBM-S2->PJM
CBM
177.277177.277
CPLELTFEXP_CPLE->PJM
CLTF
20.16220.162
SIGELTFEXP_SIGE->PJM
CLTF
0.550.55
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
1.5251.525
LAGNLTFEXP_LAGN->PJM
CLTF
15.4915.49

Details for AE2-094 TP-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 511_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 511_SRT-S
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:104.04 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4234.7
MW Contribution:12.11
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
3151601KERR 3
80/20
1.6151.615
3151581KERR 1
80/20
0.5770.577
935171AD1-152 C
80/20
2.8492.849
936161AD2-022 C
80/20
12.15912.159
270197AC1-083 C
80/20
0.9340.934
3151041BRUNSWICKG3
80/20
25.15725.157
316239AB2-077 C O1
80/20
0.4550.455
964791AG1-342 C
80/20
5.7665.766
940081AE1-250 C
80/20
12.86112.861
957601AF2-054 C
Adder
-1.8-1.53
3152661PLYWOOD A
80/20
2.0932.093
3151021BRUNSWICKG1
80/20
25.15725.157
957481AF2-042 C
80/20
129.887129.887
316003AC1-222 C
80/20
1.7441.744
24684405SMG2
80/20
3.0033.003
940601AE2-047 C
80/20
4.0274.027
944641AF1-129 C
Adder
-90.49176470588236-76.918
316240AF1-291 C
Adder
-1.9317647058823528-1.642
316263AC1-034 C
80/20
4.3284.328
937481AD2-202 C
80/20
0.8240.824
3151591KERR 2
80/20
1.6151.615
959311AF2-222 C
80/20
22.05622.056
316205AC1-080 C
80/20
0.4520.452
316123AC1-075 C
80/20
1.3531.353
942751AE2-291 C
80/20
12.11212.112
3151561HALLBR1
80/20
1.1241.124
24684305SMG1
80/20
1.0911.091
933291AC2-141 C
Adder
-32.203529411764706-27.373
3151641KERR 7
80/20
1.6151.615
313527AB2-043 C
80/20
0.7110.711
942001AE2-212 C
Adder
-2.010588235294118-1.709
3151031BRUNSWICKG2
80/20
25.15725.157
316359AB2-059 C OP
80/20
1.0881.088
934621AD1-088 C
80/20
21.36821.368
946301AF1-294 C
80/20
4.7464.746
942461AE2-259 C
80/20
12.19912.199
316283AC2-100 C
80/20
2.1162.116
316197AC1-042 C
80/20
0.3150.315
938531AE1-072 C
Adder
-16.01294117647059-13.611
316049AB1-081 C OP
80/20
0.9230.923
316238AB2-078 C O1
80/20
0.4550.455
316322AB2-045 C
80/20
0.2270.227
3152421Z1-086 GT2
80/20
33.46433.464
3152441Z1-086 ST
80/20
58.26658.266
3152411Z1-086 GT1
80/20
33.47333.473
940641AE2-051 C
Adder
-21.040000000000003-17.884
3152431Z1-086 GT3
80/20
33.46433.464
934611AD1-087 C
80/20
2.842.84
3151611KERR 4
80/20
1.6151.615
3151621KERR 5
80/20
1.6151.615
316237AB2-079 C O1
80/20
0.4550.455
316222AC1-221 C
80/20
2.6372.637
24728405LEESVG
80/20
0.8940.894
964241AG1-285 C
80/20
17.07617.076
316034AC1-036 C
80/20
0.3110.311
962561AG1-105 C
80/20
14.10814.108
316118AC1-105 C
80/20
1.5721.572
3144293JTRSVLE
80/20
0.5290.529
316217AC1-145 C
80/20
0.3750.375
942671AE2-283 C
80/20
3.3963.396
943811AF1-049 C
80/20
8.9298.929
938741AE1-100 C
80/20
0.690.69
941671AE2-166 C
80/20
5.45.4
944011AF1-069 C
80/20
45.1645.16
963041AG1-153 C
80/20
17.10317.103
3151051BRUNSWICKS1
80/20
52.26552.265
936261AD2-033 C
80/20
17.43217.432
961791AG1-021 C
80/20
2.3092.309
316248AF1-058 C
80/20
0.5710.571
936171AD2-023 C
80/20
7.0937.093
941801AE2-185 C
80/20
4.3664.366
316129AC1-054 C
80/20
1.0481.048
3151631KERR 6
80/20
1.6151.615
316131AB2-060 C
80/20
2.042.04
3138533PONTONDP
80/20
0.8550.855
24684505SMG3
80/20
1.8451.845
24684705SMG5
80/20
1.1411.141
941431AE2-140 C
80/20
13.39313.393
941031AE2-094 C
80/20
138.215138.215
3151531CLOVER1
80/20
28.86828.868
3151541CLOVER2
80/20
28.59828.598
958211AF2-115 C
80/20
2.8862.886
24684605SMG4
80/20
3.0033.003
964211AG1-282 C
Adder
-1.7011764705882353-1.446
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
1.451.45
LAGNLTFEXP_LAGN->PJM
CLTF
14.84614.846
CBM West 2LTFEXP_CBM-W2->PJM
CBM
44.76444.764
LGEELTFEXP_LGEE->PJM
CLTF
2.7422.742
MECLTFEXP_MEC->PJM
CLTF
8.3488.348
CBM West 1LTFEXP_CBM-W1->PJM
CBM
71.06671.066
NYPJM->LTFIMP_NY
CLTF
2.1082.108
TVALTFEXP_TVA->PJM
CLTF
11.71211.712
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.2639.263
CBM South 2LTFEXP_CBM-S2->PJM
CBM
170.641170.641
CPLELTFEXP_CPLE->PJM
CLTF
19.41719.417
SIGELTFEXP_SIGE->PJM
CLTF
0.5240.524
CONTINGENCY 'DVP_P1-2: LN 585_SRT-A-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 941030 CKT 1   /*8CARSON      500.0 - AE2-094 TP   500.0
END
CONTINGENCY 'DVP_P1-2: LN 585_SRT-A-2'
 OPEN BRANCH FROM BUS 314940 TO BUS 941030 CKT 1   /*8ROGERS RD   500.0 - AE2-094 TP   500.0
END
CONTINGENCY 'DVP_P1-2: LN 511_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314936 CKT 1                /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
314936 to 314902 ckt 1
941030 to 314902 ckt 1

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Base Case
OPAC149.29 %167.0A249.3121.45
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
OPAC144.76 %245.0B354.6620.97
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Base Case
OPAC151.42 %167.0A252.8721.45
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
OPAC146.26 %245.0B358.3520.97
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Base Case
OPAC152.76 %167.0A255.121.45
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
OPAC147.23 %245.0B360.7120.97
GD1DVP
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC100.26 %678.68B680.457.93
GD1DVP
6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC107.58 %571.52B614.8110.52
GD1DVP
6FINNEYWOOD-6BRIERY 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC108.24 %571.52B618.6110.52
GD1DVP
6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC100.43 %661.76B664.598.12
GD1DVP
6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC107.58 %571.52B614.8110.52
GD1DVP
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
DVP_P1-2: LN 562_SRT-S
OPAC109.95 %3118.0B3428.2912.6
GD1DVP
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 585_SRT-A-1
OPAC108.69 %4070.2B4423.7121.72
GD1DVP
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 511_SRT-S
OPAC105.93 %4070.2B4311.6919.28

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:149.29 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:249.31
MW Contribution:21.45
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:116.56 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:194.66
MW Contribution:21.16
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
926646AC1-145 E
50/50
5.9155.915
316217AC1-145 C
50/50
1.0771.077
942672AE2-283 E
50/50
8.6738.673
942752AE2-291 E
50/50
8.588.58
24728405LEESVG
50/50
1.761.76
927264AC1-222 E
Adder
2.3070588235294121.961
942671AE2-283 C
50/50
9.7139.713
941801AE2-185 C
50/50
12.48912.489
926274AC1-105 E
Adder
0.920.782
925665AC1-042 E
50/50
9.0339.033
926024AC1-080 E
50/50
1.3011.301
941802AE2-185 E
50/50
8.3268.326
940081AE1-250 C
Adder
5.1941176470588244.415
925997AC1-075 E
50/50
3.9223.922
943902AF1-058 E
Adder
0.50823529411764710.432
926055AC1-083 E
Adder
5.6364705882352944.791
316123AC1-075 C
50/50
1.1311.131
316205AC1-080 C
50/50
0.3780.378
940082AE1-250 E
Adder
3.46235294117647062.943
942751AE2-291 C
50/50
12.8712.87
3151561HALLBR1
50/50
2.682.68
316197AC1-042 C
50/50
0.9050.905
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
NYPJM->LTFIMP_NY
CLTF
0.090.09
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
MDUPJM->LTFIMP_MDU
CLTF
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1740.174
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
O66PJM->LTFIMP_O-066
CMTX_NF
1.1121.112

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:144.76 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:354.66
MW Contribution:20.97
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
926646AC1-145 E
50/50
5.85.8
316217AC1-145 C
50/50
1.0561.056
942672AE2-283 E
50/50
8.5058.505
942752AE2-291 E
50/50
8.3878.387
24728405LEESVG
50/50
1.7261.726
927264AC1-222 E
Adder
2.24117647058823531.905
942671AE2-283 C
50/50
9.5269.526
941801AE2-185 C
50/50
12.24712.247
926274AC1-105 E
Adder
0.88705882352941180.754
925665AC1-042 E
50/50
8.8598.859
926024AC1-080 E
50/50
1.2711.271
941802AE2-185 E
50/50
8.1658.165
940081AE1-250 C
Adder
5.20470588235294154.424
925997AC1-075 E
50/50
3.833.83
943902AF1-058 E
Adder
0.491764705882352940.418
926055AC1-083 E
Adder
5.5800000000000014.743
316123AC1-075 C
50/50
1.1051.105
316205AC1-080 C
50/50
0.3690.369
940082AE1-250 E
Adder
3.47058823529411782.95
942751AE2-291 C
50/50
12.5812.58
3151561HALLBR1
50/50
2.6232.623
316197AC1-042 C
50/50
0.8870.887
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
G-007PJM->LTFIMP_G-007
CMTX_NF
0.4340.434
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
NYPJM->LTFIMP_NY
CLTF
0.20.2
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
O66PJM->LTFIMP_O-066
CMTX_NF
2.7632.763

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:151.42 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:252.87
MW Contribution:21.45
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:118.61 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:198.08
MW Contribution:21.16
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
926646AC1-145 E
50/50
5.9155.915
316217AC1-145 C
50/50
1.0771.077
942672AE2-283 E
50/50
8.6738.673
942752AE2-291 E
50/50
8.588.58
24728405LEESVG
50/50
1.761.76
927264AC1-222 E
Adder
2.3070588235294121.961
942671AE2-283 C
50/50
9.7139.713
941801AE2-185 C
50/50
12.48912.489
926274AC1-105 E
Adder
0.920.782
925665AC1-042 E
50/50
9.0339.033
926024AC1-080 E
50/50
1.3011.301
941802AE2-185 E
50/50
8.3268.326
940081AE1-250 C
Adder
5.1941176470588244.415
925997AC1-075 E
50/50
3.9223.922
926055AC1-083 E
Adder
5.6364705882352944.791
316123AC1-075 C
50/50
1.1311.131
316205AC1-080 C
50/50
0.3780.378
943902AF1-058 E
Adder
0.50823529411764710.432
940082AE1-250 E
Adder
3.46235294117647062.943
942751AE2-291 C
50/50
12.8712.87
3151561HALLBR1
50/50
2.682.68
316197AC1-042 C
50/50
0.9050.905
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
NYPJM->LTFIMP_NY
CLTF
0.090.09
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
MDUPJM->LTFIMP_MDU
CLTF
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1740.174
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
O66PJM->LTFIMP_O-066
CMTX_NF
1.1121.112
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:146.26 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:358.35
MW Contribution:20.97
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
926646AC1-145 E
50/50
5.85.8
316217AC1-145 C
50/50
1.0561.056
942672AE2-283 E
50/50
8.5058.505
942752AE2-291 E
50/50
8.3878.387
24728405LEESVG
50/50
1.7261.726
927264AC1-222 E
Adder
2.24117647058823531.905
942671AE2-283 C
50/50
9.5269.526
941801AE2-185 C
50/50
12.24712.247
926274AC1-105 E
Adder
0.88705882352941180.754
925665AC1-042 E
50/50
8.8598.859
926024AC1-080 E
50/50
1.2711.271
941802AE2-185 E
50/50
8.1658.165
940081AE1-250 C
Adder
5.20470588235294154.424
925997AC1-075 E
50/50
3.833.83
943902AF1-058 E
Adder
0.491764705882352940.418
926055AC1-083 E
Adder
5.5800000000000014.743
316123AC1-075 C
50/50
1.1051.105
316205AC1-080 C
50/50
0.3690.369
940082AE1-250 E
Adder
3.47058823529411782.95
942751AE2-291 C
50/50
12.5812.58
3151561HALLBR1
50/50
2.6232.623
316197AC1-042 C
50/50
0.8870.887
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
NYPJM->LTFIMP_NY
CLTF
0.20.2
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
O66PJM->LTFIMP_O-066
CMTX_NF
2.7632.763
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
G-007PJM->LTFIMP_G-007
CMTX_NF
0.4340.434
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:152.76 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:255.1
MW Contribution:21.45
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:119.87 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:200.18
MW Contribution:21.16
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
926646AC1-145 E
50/50
5.9155.915
942752AE2-291 E
50/50
8.588.58
24728405LEESVG
50/50
1.761.76
316217AC1-145 C
50/50
1.0771.077
942672AE2-283 E
50/50
8.6738.673
942671AE2-283 C
50/50
9.7139.713
927264AC1-222 E
Adder
2.3070588235294121.961
926274AC1-105 E
Adder
0.920.782
941801AE2-185 C
50/50
12.48912.489
925665AC1-042 E
50/50
9.0339.033
926024AC1-080 E
50/50
1.3011.301
941802AE2-185 E
50/50
8.3268.326
925997AC1-075 E
50/50
3.9223.922
940081AE1-250 C
Adder
5.1941176470588244.415
316205AC1-080 C
50/50
0.3780.378
316123AC1-075 C
50/50
1.1311.131
926055AC1-083 E
Adder
5.6364705882352944.791
943902AF1-058 E
Adder
0.50823529411764710.432
942751AE2-291 C
50/50
12.8712.87
940082AE1-250 E
Adder
3.46235294117647062.943
3151561HALLBR1
50/50
2.682.68
316197AC1-042 C
50/50
0.9050.905
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
NYPJM->LTFIMP_NY
CLTF
0.090.09
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
MDUPJM->LTFIMP_MDU
CLTF
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1740.174
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
O66PJM->LTFIMP_O-066
CMTX_NF
1.1121.112

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:147.23 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:360.71
MW Contribution:20.97
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
926646AC1-145 E
50/50
5.85.8
316217AC1-145 C
50/50
1.0561.056
942672AE2-283 E
50/50
8.5058.505
942752AE2-291 E
50/50
8.3878.387
24728405LEESVG
50/50
1.7261.726
927264AC1-222 E
Adder
2.24117647058823531.905
942671AE2-283 C
50/50
9.5269.526
941801AE2-185 C
50/50
12.24712.247
926274AC1-105 E
Adder
0.88705882352941180.754
925665AC1-042 E
50/50
8.8598.859
926024AC1-080 E
50/50
1.2711.271
941802AE2-185 E
50/50
8.1658.165
925997AC1-075 E
50/50
3.833.83
940081AE1-250 C
Adder
5.20470588235294154.424
316205AC1-080 C
50/50
0.3690.369
316123AC1-075 C
50/50
1.1051.105
926055AC1-083 E
Adder
5.5800000000000014.743
943902AF1-058 E
Adder
0.491764705882352940.418
942751AE2-291 C
50/50
12.5812.58
940082AE1-250 E
Adder
3.47058823529411782.95
3151561HALLBR1
50/50
2.6232.623
316197AC1-042 C
50/50
0.8870.887
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
G-007PJM->LTFIMP_G-007
CMTX_NF
0.4340.434
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
NYPJM->LTFIMP_NY
CLTF
0.20.2
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
O66PJM->LTFIMP_O-066
CMTX_NF
2.7632.763

Details for 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.26 %
Rating:678.68 MVA
Rating Type:B
MVA to Mitigate:680.45
MW Contribution:7.93
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:101.41 %
Rating:678.68 MVA
Rating Type:B
MVA to Mitigate:688.25
MW Contribution:7.99
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316336AC2-165 C
50/50
14.80214.802
934622AD1-088 E
50/50
5.0375.037
934612AD1-087 E
Adder
3.55764705882352943.024
3151931BEARGRDN S1
50/50
17.62617.626
927255AC1-221 E
Adder
2.41411764705882352.052
946282AF1-292 E
Adder
0.407058823529411750.346
3138533PONTONDP
50/50
0.9480.948
924302AB2-077 E O1
Adder
1.30823529411764721.112
942752AE2-291 E
Adder
3.1717647058823532.696
966622AG1-532 E
Adder
0.368235294117647050.313
3147133PAMPLIN
50/50
1.5021.502
316322AB2-045 C
50/50
0.6910.691
927264AC1-222 E
Adder
3.14588235294117662.674
316258AE1-075 C
50/50
0.4360.436
946281AF1-292 C
Adder
0.60941176470588240.518
960082AF2-299 E
Adder
0.491764705882352940.418
964241AG1-285 C
50/50
1414
316034AC1-036 C
50/50
0.2950.295
958212AF2-115 E
50/50
2.7252.725
962561AG1-105 C
Adder
8.0270588235294126.823
960081AF2-299 C
Adder
0.73647058823529410.626
3151531CLOVER1
50/50
12.53612.536
936261AD2-033 C
50/50
15.36515.365
3144293JTRSVLE
50/50
0.5890.589
961791AG1-021 C
50/50
2.562.56
962562AG1-105 E
Adder
5.3517647058823544.549
924032AB2-045 E
50/50
3.0983.098
925612AC1-036 E
50/50
1.0811.081
924312AB2-078 E O1
Adder
1.30823529411764721.112
926274AC1-105 E
Adder
2.2764705882352941.935
938821AE1-108 C
Adder
8.3517647058823537.099
923862AB2-026 E
50/50
1.5381.538
936262AD2-033 E
50/50
10.24310.243
958211AF2-115 C
50/50
3.1993.199
316313AB2-026 C
50/50
0.4750.475
937482AD2-202 E
Adder
1.04117647058823540.885
961792AG1-021 E
50/50
2.182.18
3151921BEARGRDN G2
50/50
13.62513.625
966621AG1-532 C
Adder
0.55294117647058830.47
3147223TWITTYS
50/50
1.1981.198
959312AF2-222 E
50/50
14.35214.352
924022AB2-043 E O1
Adder
5.1494117647058824.377
926024AC1-080 E
Adder
0.63647058823529420.541
942462AE2-259 E
50/50
11.23511.235
964791AG1-342 C
Adder
3.142.669
925997AC1-075 E
Adder
1.91882352941176481.631
938562AE1-075 E
50/50
1.3111.311
964242AG1-285 E
50/50
9.3349.334
924162AB2-060 E OP
Adder
4.3211764705882353.673
964792AG1-342 E
Adder
2.0929411764705881.779
3151911BEARGRDN G1
50/50
13.62513.625
932763AC2-100 E
Adder
1.5964705882352941.357
933502AC2-165 E
50/50
11.1411.14
316405AF2-144 C
50/50
0.370.37
957481AF2-042 C
50/50
54.50854.508
316088AB2-174 E
Adder
2.5470588235294122.165
923994AB2-040_E
Adder
2.3941176470588242.035
924322AB2-079 E O1
Adder
1.30823529411764721.112
946302AF1-294 E
50/50
4.4554.455
943902AF1-058 E
Adder
1.04588235294117650.889
3145723EMPORIA
Adder
0.169411764705882350.144
923573AB1-173 E OP
Adder
1.2764705882352941.085
925785AC1-054 E
Adder
2.0988235294117651.784
959311AF2-222 C
50/50
21.42121.421
942751AE2-291 C
Adder
4.7576470588235294.044
940451AE2-029 C
Adder
-2.123529411764706-1.805
958502AF2-144 E
50/50
1.5111.511
957482AF2-042 E
50/50
36.33936.339
934621AD1-088 C
50/50
10.46110.461
935172AD1-152 E
Adder
4.9823529411764714.235
946301AF1-294 C
50/50
5.2615.261
942461AE2-259 C
50/50
16.85316.853
938822AE1-108 E
Adder
3.98470588235294133.387
CBM South 2LTFEXP_CBM-S2->PJM
CBM
24.92724.927
TVALTFEXP_TVA->PJM
CLTF
0.9190.919
LAGNLTFEXP_LAGN->PJM
CLTF
1.2151.215
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CPLELTFEXP_CPLE->PJM
CLTF
3.3493.349
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0870.087
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.5941.594
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.5572.557
NYPJM->LTFIMP_NY
CLTF
0.3380.338
MECLTFEXP_MEC->PJM
CLTF
0.1670.167
O66PJM->LTFIMP_O-066
CMTX_NF
4.0034.003
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6230.623
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0350.035
SIGELTFEXP_SIGE->PJM
CLTF
0.0040.004

Details for 6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:107.58 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:614.81
MW Contribution:10.52
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:112.99 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:645.76
MW Contribution:10.76
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316336AC2-165 C
Adder
-4.488235294117647-3.815
934622AD1-088 E
50/50
8.0788.078
934611AD1-087 C
50/50
1.9191.919
934612AD1-087 E
50/50
5.5365.536
3151611KERR 4
50/50
1.1131.113
927255AC1-221 E
50/50
3.413.41
924302AB2-077 E O1
50/50
1.321.32
3151621KERR 5
50/50
1.1131.113
316222AC1-221 C
50/50
1.3041.304
942752AE2-291 E
50/50
4.2094.209
946282AF1-292 E
Adder
0.32235294117647060.274
316129AC1-054 C
50/50
0.8410.841
316131AB2-060 C
50/50
1.3891.389
316118AC1-105 C
50/50
0.9880.988
946281AF1-292 C
Adder
0.48352941176470590.411
960082AF2-299 E
Adder
0.38941176470588240.331
3151541CLOVER2
50/50
19.33819.338
964241AG1-285 C
50/50
16.2716.27
316034AC1-036 C
50/50
0.1660.166
962561AG1-105 C
50/50
9.2429.242
966622AG1-532 E
Adder
0.29176470588235290.248
927264AC1-222 E
50/50
4.2714.271
925612AC1-036 E
50/50
0.6080.608
316237AB2-079 C O1
50/50
0.3240.324
924312AB2-078 E O1
50/50
1.321.32
316238AB2-078 C O1
50/50
0.3240.324
926274AC1-105 E
50/50
2.892.89
938821AE1-108 C
Adder
-8.042352941176471-6.836
960081AF2-299 C
Adder
0.58352941176470590.496
3151531CLOVER1
50/50
19.51919.519
936261AD2-033 C
Adder
5.2729411764705894.482
3151631KERR 6
50/50
1.1131.113
962562AG1-105 E
50/50
6.1616.161
316248AF1-058 C
50/50
0.3490.349
936262AD2-033 E
Adder
3.5152941176470592.988
937482AD2-202 E
50/50
1.621.62
3151581KERR 1
50/50
0.3970.397
3151601KERR 3
50/50
1.1131.113
3152661PLYWOOD A
50/50
1.3061.306
941011AE2-092 C
Adder
-7.384705882352941-6.277
966621AG1-532 C
Adder
0.437647058823529440.372
3147223TWITTYS
50/50
0.6740.674
959312AF2-222 E
Adder
6.66588235294117755.666
924022AB2-043 E O1
50/50
5.1075.107
316003AC1-222 C
50/50
1.0461.046
926024AC1-080 E
50/50
0.8510.851
316239AB2-077 C O1
50/50
0.3240.324
935171AD1-152 C
50/50
1.8391.839
964791AG1-342 C
50/50
3.7243.724
925997AC1-075 E
50/50
2.5662.566
964242AG1-285 E
50/50
10.84610.846
313527AB2-043 C
50/50
0.5090.509
924162AB2-060 E OP
50/50
3.9993.999
3151591KERR 2
50/50
1.1131.113
964792AG1-342 E
50/50
2.4822.482
932763AC2-100 E
50/50
2.2422.242
316283AC2-100 C
50/50
1.0191.019
3137643SOCKMAN
Adder
0.236470588235294130.201
937481AD2-202 C
50/50
0.5570.557
3151641KERR 7
50/50
1.1131.113
316205AC1-080 C
50/50
0.2470.247
316123AC1-075 C
50/50
0.740.74
957481AF2-042 C
50/50
85.94285.942
316088AB2-174 E
Adder
2.0917647058823531.778
923994AB2-040_E
Adder
1.99764705882352931.698
924322AB2-079 E O1
50/50
1.321.32
943902AF1-058 E
50/50
1.4231.423
3145723EMPORIA
Adder
0.136470588235294120.116
923573AB1-173 E OP
Adder
1.06470588235294120.905
919692AA2-053 E OP
Adder
1.31411764705882361.117
925785AC1-054 E
50/50
2.3712.371
959311AF2-222 C
Adder
9.9482352941176468.456
942751AE2-291 C
50/50
6.3136.313
957482AF2-042 E
50/50
57.29557.295
934621AD1-088 C
50/50
16.77816.778
935172AD1-152 E
50/50
7.5637.563
942461AE2-259 C
Adder
-11.085882352941177-9.423
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.6115.611
NYPJM->LTFIMP_NY
CLTF
0.2910.291
TVALTFEXP_TVA->PJM
CLTF
1.5461.546
O66PJM->LTFIMP_O-066
CMTX_NF
3.8923.892
CBM West 1LTFEXP_CBM-W1->PJM
CBM
7.2877.287
G-007PJM->LTFIMP_G-007
CMTX_NF
0.610.61
CPLELTFEXP_CPLE->PJM
CLTF
3.4573.457
SIGELTFEXP_SIGE->PJM
CLTF
0.0570.057
CBM South 2LTFEXP_CBM-S2->PJM
CBM
27.50427.504
WECLTFEXP_WEC->PJM
CLTF
0.1510.151
LAGNLTFEXP_LAGN->PJM
CLTF
1.9781.978
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.2860.286
MECLTFEXP_MEC->PJM
CLTF
0.9490.949
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.6471.647

Details for 6FINNEYWOOD-6BRIERY 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FINNEYWOOD-6BRIERY 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:108.24 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:618.61
MW Contribution:10.52
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FINNEYWOOD-6BRIERY 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:113.66 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:649.58
MW Contribution:10.76
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316336AC2-165 C
Adder
-4.488235294117647-3.815
934622AD1-088 E
50/50
8.0788.078
934611AD1-087 C
50/50
1.9191.919
934612AD1-087 E
50/50
5.5365.536
3151611KERR 4
50/50
1.1131.113
927255AC1-221 E
50/50
3.413.41
924302AB2-077 E O1
50/50
1.321.32
3151621KERR 5
50/50
1.1131.113
316222AC1-221 C
50/50
1.3041.304
942752AE2-291 E
50/50
4.2094.209
946282AF1-292 E
Adder
0.32235294117647060.274
316129AC1-054 C
50/50
0.8410.841
316131AB2-060 C
50/50
1.3891.389
316118AC1-105 C
50/50
0.9880.988
946281AF1-292 C
Adder
0.48352941176470590.411
960082AF2-299 E
Adder
0.38941176470588240.331
3151541CLOVER2
50/50
19.33819.338
964241AG1-285 C
50/50
16.2716.27
316034AC1-036 C
50/50
0.1660.166
962561AG1-105 C
50/50
9.2429.242
966622AG1-532 E
Adder
0.29176470588235290.248
927264AC1-222 E
50/50
4.2714.271
925612AC1-036 E
50/50
0.6080.608
316237AB2-079 C O1
50/50
0.3240.324
924312AB2-078 E O1
50/50
1.321.32
316238AB2-078 C O1
50/50
0.3240.324
926274AC1-105 E
50/50
2.892.89
938821AE1-108 C
Adder
-8.042352941176471-6.836
960081AF2-299 C
Adder
0.58352941176470590.496
3151531CLOVER1
50/50
19.51919.519
936261AD2-033 C
Adder
5.2729411764705894.482
3151631KERR 6
50/50
1.1131.113
962562AG1-105 E
50/50
6.1616.161
316248AF1-058 C
50/50
0.3490.349
936262AD2-033 E
Adder
3.5152941176470592.988
937482AD2-202 E
50/50
1.621.62
3151581KERR 1
50/50
0.3970.397
3151601KERR 3
50/50
1.1131.113
3152661PLYWOOD A
50/50
1.3061.306
941011AE2-092 C
Adder
-7.384705882352941-6.277
966621AG1-532 C
Adder
0.437647058823529440.372
3147223TWITTYS
50/50
0.6740.674
959312AF2-222 E
Adder
6.66588235294117755.666
924022AB2-043 E O1
50/50
5.1075.107
316003AC1-222 C
50/50
1.0461.046
926024AC1-080 E
50/50
0.8510.851
316239AB2-077 C O1
50/50
0.3240.324
935171AD1-152 C
50/50
1.8391.839
964791AG1-342 C
50/50
3.7243.724
925997AC1-075 E
50/50
2.5662.566
964242AG1-285 E
50/50
10.84610.846
313527AB2-043 C
50/50
0.5090.509
924162AB2-060 E OP
50/50
3.9993.999
3151591KERR 2
50/50
1.1131.113
964792AG1-342 E
50/50
2.4822.482
932763AC2-100 E
50/50
2.2422.242
316283AC2-100 C
50/50
1.0191.019
3137643SOCKMAN
Adder
0.236470588235294130.201
937481AD2-202 C
50/50
0.5570.557
3151641KERR 7
50/50
1.1131.113
316205AC1-080 C
50/50
0.2470.247
316123AC1-075 C
50/50
0.740.74
957481AF2-042 C
50/50
85.94285.942
316088AB2-174 E
Adder
2.0917647058823531.778
923994AB2-040_E
Adder
1.99764705882352931.698
924322AB2-079 E O1
50/50
1.321.32
943902AF1-058 E
50/50
1.4231.423
3145723EMPORIA
Adder
0.136470588235294120.116
923573AB1-173 E OP
Adder
1.06470588235294120.905
919692AA2-053 E OP
Adder
1.31411764705882361.117
925785AC1-054 E
50/50
2.3712.371
959311AF2-222 C
Adder
9.9482352941176468.456
942751AE2-291 C
50/50
6.3136.313
957482AF2-042 E
50/50
57.29557.295
934621AD1-088 C
50/50
16.77816.778
935172AD1-152 E
50/50
7.5637.563
942461AE2-259 C
Adder
-11.085882352941177-9.423
CBM West 1LTFEXP_CBM-W1->PJM
CBM
7.2877.287
G-007PJM->LTFIMP_G-007
CMTX_NF
0.610.61
CPLELTFEXP_CPLE->PJM
CLTF
3.4573.457
SIGELTFEXP_SIGE->PJM
CLTF
0.0570.057
CBM South 2LTFEXP_CBM-S2->PJM
CBM
27.50427.504
WECLTFEXP_WEC->PJM
CLTF
0.1510.151
LAGNLTFEXP_LAGN->PJM
CLTF
1.9781.978
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.2860.286
MECLTFEXP_MEC->PJM
CLTF
0.9490.949
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.6471.647
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.6115.611
NYPJM->LTFIMP_NY
CLTF
0.2910.291
TVALTFEXP_TVA->PJM
CLTF
1.5461.546
O66PJM->LTFIMP_O-066
CMTX_NF
3.8923.892

Details for 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.43 %
Rating:661.76 MVA
Rating Type:B
MVA to Mitigate:664.59
MW Contribution:8.12
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:104.65 %
Rating:661.76 MVA
Rating Type:B
MVA to Mitigate:692.56
MW Contribution:8.31
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316336AC2-165 C
50/50
13.74413.744
934622AD1-088 E
50/50
4.7234.723
934612AD1-087 E
Adder
3.3423529411764712.841
3151931BEARGRDN S1
50/50
16.39716.397
927255AC1-221 E
Adder
2.28823529411764741.945
3138533PONTONDP
50/50
0.8860.886
924302AB2-077 E O1
Adder
1.22941176470588221.045
942752AE2-291 E
Adder
3.24941176470588242.762
958131AF2-107 C
Adder
3.683.128
3147133PAMPLIN
50/50
1.4031.403
316322AB2-045 C
50/50
0.6440.644
927264AC1-222 E
Adder
3.01882352941176452.566
958132AF2-107 E
Adder
2.01647058823529421.714
316258AE1-075 C
50/50
0.4040.404
964241AG1-285 C
50/50
13.1313.13
316034AC1-036 C
50/50
0.2760.276
958212AF2-115 E
50/50
2.5482.548
962561AG1-105 C
Adder
7.5811764705882356.444
3151531CLOVER1
50/50
11.77811.778
936261AD2-033 C
50/50
14.39414.394
3144293JTRSVLE
50/50
0.5510.551
961791AG1-021 C
50/50
2.3932.393
962562AG1-105 E
Adder
5.0541176470588244.296
924032AB2-045 E
50/50
2.8862.886
925612AC1-036 E
50/50
1.0121.012
924312AB2-078 E O1
Adder
1.22941176470588221.045
926274AC1-105 E
Adder
2.161.836
938821AE1-108 C
50/50
25.39325.393
923862AB2-026 E
50/50
1.4271.427
936262AD2-033 E
50/50
9.5969.596
958211AF2-115 C
50/50
2.9912.991
941012AE2-092 E
50/50
11.5111.51
316313AB2-026 C
50/50
0.4410.441
937482AD2-202 E
Adder
0.97882352941176460.832
961792AG1-021 E
50/50
2.0382.038
3151921BEARGRDN G2
50/50
12.67512.675
941011AE2-092 C
50/50
17.26517.265
3147223TWITTYS
50/50
1.1221.122
959312AF2-222 E
50/50
13.43613.436
924022AB2-043 E O1
Adder
4.8352941176470594.11
926024AC1-080 E
Adder
0.63882352941176480.543
942462AE2-259 E
50/50
10.48710.487
964791AG1-342 C
Adder
2.96941176470588262.524
925997AC1-075 E
Adder
1.9235294117647061.635
938562AE1-075 E
50/50
1.2171.217
964242AG1-285 E
50/50
8.7538.753
924162AB2-060 E OP
Adder
4.0564705882352943.448
964792AG1-342 E
Adder
1.98000000000000021.683
3151911BEARGRDN G1
50/50
12.67512.675
932763AC2-100 E
Adder
1.51411764705882361.287
933502AC2-165 E
50/50
10.34410.344
316405AF2-144 C
50/50
0.3440.344
957481AF2-042 C
50/50
51.1751.17
924322AB2-079 E O1
Adder
1.22941176470588221.045
946302AF1-294 E
50/50
4.1654.165
943902AF1-058 E
Adder
0.99529411764705880.846
925785AC1-054 E
Adder
1.96941176470588241.674
959311AF2-222 C
50/50
20.05320.053
942751AE2-291 C
Adder
4.8729411764705884.142
940451AE2-029 C
Adder
-2.083529411764706-1.771
958502AF2-144 E
50/50
1.4021.402
957482AF2-042 E
50/50
34.11434.114
934621AD1-088 C
50/50
9.8099.809
935172AD1-152 E
Adder
4.6929411764705893.989
946301AF1-294 C
50/50
4.9194.919
942461AE2-259 C
50/50
15.73115.731
938822AE1-108 E
50/50
12.11612.116
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.0313.031
NYPJM->LTFIMP_NY
CLTF
0.3410.341
TVALTFEXP_TVA->PJM
CLTF
1.011.01
O66PJM->LTFIMP_O-066
CMTX_NF
4.1084.108
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.2770.277
G-007PJM->LTFIMP_G-007
CMTX_NF
0.640.64
CPLELTFEXP_CPLE->PJM
CLTF
3.2143.214
SIGELTFEXP_SIGE->PJM
CLTF
0.0140.014
CBM South 2LTFEXP_CBM-S2->PJM
CBM
24.38324.383
WECLTFEXP_WEC->PJM
CLTF
0.0140.014
LAGNLTFEXP_LAGN->PJM
CLTF
1.3161.316
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.0360.036
MECLTFEXP_MEC->PJM
CLTF
0.30.3
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.531.53

Details for 6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:107.58 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:614.81
MW Contribution:10.52
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:112.99 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:645.76
MW Contribution:10.76
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316336AC2-165 C
Adder
-4.488235294117647-3.815
934622AD1-088 E
50/50
8.0788.078
934611AD1-087 C
50/50
1.9191.919
934612AD1-087 E
50/50
5.5365.536
3151611KERR 4
50/50
1.1131.113
927255AC1-221 E
50/50
3.413.41
924302AB2-077 E O1
50/50
1.321.32
3151621KERR 5
50/50
1.1131.113
316222AC1-221 C
50/50
1.3041.304
942752AE2-291 E
50/50
4.2094.209
946282AF1-292 E
Adder
0.32235294117647060.274
316129AC1-054 C
50/50
0.8410.841
316131AB2-060 C
50/50
1.3891.389
316118AC1-105 C
50/50
0.9880.988
946281AF1-292 C
Adder
0.48352941176470590.411
960082AF2-299 E
Adder
0.38941176470588240.331
3151541CLOVER2
50/50
19.33819.338
964241AG1-285 C
50/50
16.2716.27
316034AC1-036 C
50/50
0.1660.166
962561AG1-105 C
50/50
9.2429.242
966622AG1-532 E
Adder
0.29176470588235290.248
927264AC1-222 E
50/50
4.2714.271
925612AC1-036 E
50/50
0.6080.608
316237AB2-079 C O1
50/50
0.3240.324
924312AB2-078 E O1
50/50
1.321.32
316238AB2-078 C O1
50/50
0.3240.324
926274AC1-105 E
50/50
2.892.89
938821AE1-108 C
Adder
-8.042352941176471-6.836
960081AF2-299 C
Adder
0.58352941176470590.496
3151531CLOVER1
50/50
19.51919.519
936261AD2-033 C
Adder
5.2729411764705894.482
3151631KERR 6
50/50
1.1131.113
962562AG1-105 E
50/50
6.1616.161
316248AF1-058 C
50/50
0.3490.349
936262AD2-033 E
Adder
3.5152941176470592.988
937482AD2-202 E
50/50
1.621.62
3151581KERR 1
50/50
0.3970.397
3151601KERR 3
50/50
1.1131.113
3152661PLYWOOD A
50/50
1.3061.306
941011AE2-092 C
Adder
-7.384705882352941-6.277
966621AG1-532 C
Adder
0.437647058823529440.372
3147223TWITTYS
50/50
0.6740.674
959312AF2-222 E
Adder
6.66588235294117755.666
924022AB2-043 E O1
50/50
5.1075.107
316003AC1-222 C
50/50
1.0461.046
926024AC1-080 E
50/50
0.8510.851
316239AB2-077 C O1
50/50
0.3240.324
935171AD1-152 C
50/50
1.8391.839
964791AG1-342 C
50/50
3.7243.724
925997AC1-075 E
50/50
2.5662.566
964242AG1-285 E
50/50
10.84610.846
313527AB2-043 C
50/50
0.5090.509
924162AB2-060 E OP
50/50
3.9993.999
3151591KERR 2
50/50
1.1131.113
964792AG1-342 E
50/50
2.4822.482
932763AC2-100 E
50/50
2.2422.242
316283AC2-100 C
50/50
1.0191.019
3137643SOCKMAN
Adder
0.236470588235294130.201
937481AD2-202 C
50/50
0.5570.557
3151641KERR 7
50/50
1.1131.113
316205AC1-080 C
50/50
0.2470.247
316123AC1-075 C
50/50
0.740.74
957481AF2-042 C
50/50
85.94285.942
316088AB2-174 E
Adder
2.0917647058823531.778
923994AB2-040_E
Adder
1.99764705882352931.698
924322AB2-079 E O1
50/50
1.321.32
943902AF1-058 E
50/50
1.4231.423
3145723EMPORIA
Adder
0.136470588235294120.116
923573AB1-173 E OP
Adder
1.06470588235294120.905
919692AA2-053 E OP
Adder
1.31411764705882361.117
925785AC1-054 E
50/50
2.3712.371
959311AF2-222 C
Adder
9.9482352941176468.456
942751AE2-291 C
50/50
6.3136.313
957482AF2-042 E
50/50
57.29557.295
934621AD1-088 C
50/50
16.77816.778
935172AD1-152 E
50/50
7.5637.563
942461AE2-259 C
Adder
-11.085882352941177-9.423
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.2860.286
MECLTFEXP_MEC->PJM
CLTF
0.9490.949
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.6471.647
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.6115.611
NYPJM->LTFIMP_NY
CLTF
0.2910.291
TVALTFEXP_TVA->PJM
CLTF
1.5461.546
O66PJM->LTFIMP_O-066
CMTX_NF
3.8923.892
CBM West 1LTFEXP_CBM-W1->PJM
CBM
7.2877.287
G-007PJM->LTFIMP_G-007
CMTX_NF
0.610.61
CPLELTFEXP_CPLE->PJM
CLTF
3.4573.457
SIGELTFEXP_SIGE->PJM
CLTF
0.0570.057
CBM South 2LTFEXP_CBM-S2->PJM
CBM
27.50427.504
WECLTFEXP_WEC->PJM
CLTF
0.1510.151
LAGNLTFEXP_LAGN->PJM
CLTF
1.9781.978

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 562_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 562_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:109.95 %
Rating:3118.0 MVA
Rating Type:B
MVA to Mitigate:3428.29
MW Contribution:12.6
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 562_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:112.79 %
Rating:3118.0 MVA
Rating Type:B
MVA to Mitigate:3516.86
MW Contribution:13.56
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
940641AE2-051 C
Adder
11.86941176470588410.089
316084AB2-161 E
Adder
4.9458823529411764.204
3145946PLYMOUTH TP
Adder
0.33176470588235290.282
933982AD1-022 E
Adder
4.9552941176470594.212
934622AD1-088 E
50/50
6.1576.157
934611AD1-087 C
50/50
1.7341.734
934612AD1-087 E
50/50
5.0015.001
927146AC1-208 E
Adder
4.6141176470588243.922
3151611KERR 4
50/50
1.4211.421
927255AC1-221 E
Adder
4.5388235294117653.858
932046AC2-012 E
Adder
11.569.826
938531AE1-072 C
Adder
16.09529411764705713.681
958161AF2-110 C
Adder
1.28705882352941181.094
3152411Z1-086 GT1
50/50
17.59317.593
3152421Z1-086 GT2
50/50
17.58717.587
3145393UNCAMP
Adder
6.1494117647058835.227
933981AD1-022 C
Adder
9.1035294117647067.738
900672V4-068 E
Adder
0.38470588235294120.327
3147043LAWRENC
50/50
0.3770.377
944012AF1-069 E
50/50
8.6028.602
316315AB2-025 C
50/50
0.5220.522
946282AF1-292 E
50/50
1.2541.254
316129AC1-054 C
50/50
1.4721.472
316131AB2-060 C
50/50
1.841.84
3138533PONTONDP
Adder
0.6682352941176470.568
917512Z2-088 E OP1
Adder
5.5647058823529424.73
316118AC1-105 C
50/50
1.1221.122
944582AF1-123 E
Adder
93.7058823529411979.65
944592AF1-124 E
Adder
94.0458823529411879.939
935112AD1-144 E
Adder
0.82235294117647050.699
316349AD2-085 C
Adder
3.17647058823529442.7
923832AB2-022 E
Adder
1.15411764705882350.981
963042AG1-153 E
50/50
13.87613.876
938772AE1-103 E
Adder
4.043.434
916042Z1-036 E
Adder
27.86705882352941523.687
316023AB2-100 C2
50/50
1.1741.174
946281AF1-292 C
50/50
1.8821.882
960082AF2-299 E
50/50
1.5151.515
926071AC1-086 C
50/50
24.68624.686
3151541CLOVER2
50/50
17.44717.447
964241AG1-285 C
50/50
16.41216.412
316034AC1-036 C
50/50
0.2810.281
958212AF2-115 E
Adder
1.92235294117647061.634
927021AC1-189 C
Adder
9.4905882352941178.067
962561AG1-105 C
50/50
10.94410.944
924152AB2-059 E OP
Adder
6.1352941176470595.215
3151411GASTONB
50/50
3.5873.587
924302AB2-077 E O1
50/50
1.6651.665
3151621KERR 5
50/50
1.4211.421
942752AE2-291 E
Adder
5.0411764705882364.285
938532AE1-072 E
Adder
8.3905882352941187.132
3146326AYDLETT TAP
Adder
1.24352941176470581.057
943461AF1-017 C
Adder
1.24588235294117641.059
316311AC2-079 C
Adder
5.3058823529411764.51
932596AC2-079 E
Adder
8.657647058823537.359
3152431Z1-086 GT3
50/50
17.58717.587
3152441Z1-086 ST
50/50
30.62430.624
917122Z2-027 E
Adder
1.2588235294117651.07
920692AA2-178 E
Adder
4.1341176470588233.514
966622AG1-532 E
50/50
1.1371.137
3147133PAMPLIN
Adder
0.99882352941176470.849
922923AB1-081 E OP
Adder
4.3305882352941183.681
927264AC1-222 E
Adder
4.7623529411764714.048
961611AG1-000B C
Adder
10.8141176470588249.192
940541AE2-040 C
50/50
3.6773.677
940482AE2-033 E
50/50
13.89413.894
940481AE2-033 C
50/50
20.60920.609
316181AB2-040 GEN
50/50
1.5171.517
923263AB1-132 E OP
50/50
7.1847.184
936172AD2-023 E
Adder
2.6305882352941182.236
944011AF1-069 C
50/50
22.14222.142
941591AE2-156 C
Adder
15.80117647058823513.431
944591AF1-124 C
Adder
41.0670588235294134.907
944601AF1-125 C
Adder
40.2917647058823534.248
936666AD2-085 E
Adder
5.1823529411764714.405
963041AG1-153 C
50/50
9.2519.251
938771AE1-103 C
Adder
2.9258823529411772.487
3145413WATKINS
Adder
0.7117647058823530.605
960081AF2-299 C
50/50
2.2732.273
3151391GASTONA
50/50
3.5873.587
926072AC1-086 E
50/50
11.23511.235
3151531CLOVER1
50/50
17.6117.61
936261AD2-033 C
Adder
14.85882352941176512.63
3151631KERR 6
50/50
1.4211.421
961791AG1-021 C
Adder
1.80470588235294121.534
962562AG1-105 E
50/50
7.2967.296
936171AD2-023 C
Adder
4.8458823529411764.119
925612AC1-036 E
50/50
1.0321.032
316237AB2-079 C O1
50/50
0.4080.408
924312AB2-078 E O1
50/50
1.6651.665
316238AB2-078 C O1
50/50
0.4080.408
926274AC1-105 E
50/50
3.2853.285
939412AE1-173 E
50/50
87.82287.822
941032AE2-094 E
50/50
30.35130.351
941031AE2-094 C
50/50
67.76767.767
926662AC1-147 E
Adder
1.1682352941176470.993
916192Z1-068 E
Adder
1.681.428
957492AF2-043 E
Adder
1.33058823529411761.131
923852AB2-025 E
50/50
1.4871.487
3151051BRUNSWICKS1
50/50
28.36928.369
961941AG1-037 C
Adder
0.54705882352941180.465
961942AG1-037 E
Adder
0.364705882352941160.31
3151381ROSEMG2
50/50
1.121.12
936262AD2-033 E
Adder
9.9058823529411778.42
958211AF2-115 C
Adder
2.2564705882352941.918
934321AD1-056 C
Adder
7.3117647058823536.215
934331AD1-057 C
Adder
4.0788235294117653.467
934332AD1-057 E
Adder
2.12470588235294141.806
934322AD1-056 E
Adder
3.96588235294117643.371
927022AC1-189 E
Adder
4.7270588235294114.018
925595AC1-034 E
Adder
5.824.947
933292AC2-141 E
Adder
9.4658823529411768.046
944602AF1-125 E
Adder
92.2352941176470778.4
3145506HICKORY
Adder
1.97176470588235291.676
934576AD1-082 E
Adder
3.94000000000000043.349
957871AF2-081 C
Adder
9.127.752
943612AF1-032 E
Adder
0.86470588235294120.735
940492AE2-034 E
Adder
3.10117647058823562.636
934522AD1-076 E
Adder
6.4164705882352945.454
943172AE2-346 E
Adder
0.65647058823529430.558
918492AA1-063AE OP
Adder
4.6188235294117653.926
937482AD2-202 E
50/50
1.4641.464
917332KELFORD E
Adder
1.81647058823529431.544
925122AB2-169 E
Adder
6.13764705882352955.217
316274AC1-208 C
Adder
10.3917647058823548.833
3151581KERR 1
50/50
0.5070.507
3151601KERR 3
50/50
1.4211.421
961792AG1-021 E
Adder
1.53764705882352941.307
917342Z2-044 E
Adder
0.69294117647058820.589
3151311EDGECMA
Adder
18.0294117647058815.325
3152661PLYWOOD A
50/50
1.481.48
940642AE2-051 E
Adder
7.9129411764705886.726
919153AA1-139 E2
Adder
3.72941176470588243.17
943462AF1-017 E
Adder
2.03294117647058851.728
942341AE2-247 C
Adder
1.37647058823529411.17
958162AF2-110 E
Adder
2.0482352941176471.741
924516AB2-100 E1
50/50
3.5383.538
934512AD1-075 E
Adder
4.4117647058823533.75
934502AD1-074 E
Adder
17.64705882352941315
966621AG1-532 C
50/50
1.7051.705
918512AA1-065 E OP
Adder
5.9082352941176485.022
3147223TWITTYS
50/50
1.1441.144
959312AF2-222 E
50/50
13.18813.188
924022AB2-043 E O1
50/50
6.4666.466
918532AA1-067 E
Adder
0.79411764705882360.675
926024AC1-080 E
Adder
0.99529411764705880.846
936161AD2-022 C
Adder
8.3070588235294117.061
3143316POE
Adder
1.37294117647058831.167
939191AE1-149 C
Adder
9.3894117647058827.981
901082W1-029 E
Adder
30.21176470588235225.68
316365AB2-100 C1
50/50
1.1741.174
926206AC1-098 E
Adder
4.163.536
316239AB2-077 C O1
50/50
0.4080.408
935171AD1-152 C
50/50
1.7771.777
942462AE2-259 E
Adder
5.74352941176470564.882
964791AG1-342 C
50/50
4.3544.354
925997AC1-075 E
Adder
3.00117647058823562.551
926755AC1-161 E
Adder
9.4658823529411768.046
933291AC2-141 C
Adder
22.1752941176470618.849
925522AC1-027 E
Adder
1.08705882352941190.924
957872AF2-081 E
Adder
3.9082352941176473.322
3145256KINGFORK
Adder
0.88470588235294120.752
941102AE2-104 E
Adder
5.0152941176470594.263
316087AB2-174 C
50/50
1.4141.414
964242AG1-285 E
50/50
10.94110.941
926214AC1-099 E
Adder
1.37411764705882341.168
932632AC2-084 E
Adder
3.67764705882352953.126
313527AB2-043 C
50/50
0.6440.644
924162AB2-060 E OP
50/50
5.2985.298
3151591KERR 2
50/50
1.4211.421
964792AG1-342 E
50/50
2.9022.902
932763AC2-100 E
Adder
3.07764705882352942.616
939411AE1-173 C
50/50
131.733131.733
913392Y1-086 E
Adder
2.04470588235294141.738
3137643SOCKMAN
50/50
0.840.84
937481AD2-202 C
50/50
0.5030.503
3151641KERR 7
50/50
1.4211.421
919710AA2-057 E
Adder
4.582352941176473.895
942002AE2-212 E
Adder
1.10941176470588230.943
944581AF1-123 C
Adder
40.92117647058823634.783
941101AE2-104 C
Adder
3.1552941176470592.682
3151041BRUNSWICKG3
50/50
13.65513.655
3151021BRUNSWICKG1
50/50
13.65513.655
957481AF2-042 C
50/50
77.56977.569
316088AB2-174 E
50/50
7.8297.829
316141AB2-099 E
Adder
0.27411764705882360.233
923994AB2-040_E
50/50
7.3457.345
313506AB1-173 C OP
50/50
1.3471.347
3151361ROSEMG1
50/50
2.3922.392
924322AB2-079 E O1
50/50
1.6651.665
946302AF1-294 E
Adder
3.14235294117647032.671
961672AG1-007 E
Adder
0.60823529411764710.517
943902AF1-058 E
Adder
1.57294117647058831.337
919152AA1-139 E1
Adder
3.72941176470588243.17
942342AE2-247 E
Adder
1.90117647058823551.616
920042AA2-088 E OP
Adder
11.3505882352941179.648
934511AD1-075 C
Adder
8.6670588235294137.367
934521AD1-076 C
Adder
12.58941176470588310.701
3145723EMPORIA
50/50
0.5220.522
923573AB1-173 E OP
50/50
3.9183.918
316011AB1-132 C OP
50/50
2.7392.739
919692AA2-053 E OP
Adder
4.8717647058823534.141
925785AC1-054 E
50/50
4.1514.151
959311AF2-222 C
50/50
19.68319.683
316263AC1-034 C
Adder
7.7152941176470586.558
942751AE2-291 C
Adder
7.5611764705882356.427
942001AE2-212 C
Adder
1.66470588235294131.415
939192AE1-149 E
Adder
6.265.321
934065AD1-033 E
Adder
4.5188235294117653.841
939312AE1-162 E
Adder
1.10352941176470590.938
937226AE2-253 E
Adder
5.3141176470588244.517
3151031BRUNSWICKG2
50/50
13.65513.655
924517AB2-100 E2
50/50
3.5383.538
934501AD1-074 C
Adder
34.6658823529411829.466
957482AF2-042 E
50/50
51.71351.713
934621AD1-088 C
50/50
12.78812.788
3151371ROSEMS1
50/50
1.4821.482
935172AD1-152 E
50/50
7.3117.311
946301AF1-294 C
Adder
3.71058823529411753.154
942461AE2-259 C
Adder
8.6164705882352957.324
961671AG1-007 C
Adder
1.07294117647058830.912
936162AD2-022 E
Adder
4.9847058823529424.237
CBM South 2LTFEXP_CBM-S2->PJM
CBM
116.28116.28
WECLTFEXP_WEC->PJM
CLTF
0.6880.688
LAGNLTFEXP_LAGN->PJM
CLTF
8.7928.792
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.3031.303
MECLTFEXP_MEC->PJM
CLTF
4.2814.281
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
6.7816.781
CBM West 2LTFEXP_CBM-W2->PJM
CBM
25.07725.077
NYPJM->LTFIMP_NY
CLTF
1.7121.712
TVALTFEXP_TVA->PJM
CLTF
6.8686.868
O66PJM->LTFIMP_O-066
CMTX_NF
23.37723.377
CBM West 1LTFEXP_CBM-W1->PJM
CBM
33.14933.149
G-007PJM->LTFIMP_G-007
CMTX_NF
3.6713.671
CPLELTFEXP_CPLE->PJM
CLTF
14.22614.226
SIGELTFEXP_SIGE->PJM
CLTF
0.260.26

Details for 8RAWLINGS-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 585_SRT-A-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 585_SRT-A-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:108.69 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4423.71
MW Contribution:21.72
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 585_SRT-A-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:114.82 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4673.36
MW Contribution:22.52
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
940641AE2-051 C
Adder
-21.288235294117648-18.095
934622AD1-088 E
50/50
11.49611.496
934611AD1-087 C
50/50
3.233.23
934612AD1-087 E
50/50
9.3199.319
3151611KERR 4
50/50
1.991.99
927255AC1-221 E
50/50
7.6147.614
938531AE1-072 C
Adder
-16.06705882352941-13.657
3152411Z1-086 GT1
50/50
32.42432.424
3152421Z1-086 GT2
50/50
32.41332.413
924302AB2-077 E O1
50/50
2.6052.605
3151621KERR 5
50/50
1.991.99
316222AC1-221 C
50/50
2.9122.912
942752AE2-291 E
Adder
8.6882352941176467.385
944012AF1-069 E
50/50
15.22215.222
316131AB2-060 C
50/50
2.8942.894
3138533PONTONDP
Adder
1.14470588235294120.973
316118AC1-105 C
50/50
1.8951.895
963042AG1-153 E
50/50
26.04926.049
3151541CLOVER2
50/50
32.52432.524
964241AG1-285 C
50/50
28.57228.572
316034AC1-036 C
50/50
0.4960.496
958212AF2-115 E
Adder
3.2894117647058822.796
962561AG1-105 C
50/50
17.96517.965
936172AD2-023 E
Adder
3.9305882352941183.341
3152431Z1-086 GT3
50/50
32.41332.413
3152441Z1-086 ST
50/50
56.44256.442
3147133PAMPLIN
50/50
1.8091.809
927264AC1-222 E
50/50
8.2018.201
925612AC1-036 E
50/50
1.8171.817
316237AB2-079 C O1
50/50
0.6390.639
924312AB2-078 E O1
50/50
2.6052.605
316238AB2-078 C O1
50/50
0.6390.639
926274AC1-105 E
50/50
5.5465.546
944011AF1-069 C
50/50
39.18539.185
963041AG1-153 C
50/50
17.36617.366
3151531CLOVER1
50/50
32.82832.828
936261AD2-033 C
50/50
24.11624.116
3151631KERR 6
50/50
1.991.99
961791AG1-021 C
Adder
3.08941176470588232.626
962562AG1-105 E
50/50
11.97711.977
924032AB2-045 E
Adder
1.26941176470588221.079
316248AF1-058 C
50/50
0.6640.664
936171AD2-023 C
Adder
7.246.154
941032AE2-094 E
50/50
53.71353.713
941031AE2-094 C
50/50
119.928119.928
3151051BRUNSWICKS1
50/50
53.25453.254
936262AD2-033 E
50/50
16.07816.078
958211AF2-115 C
Adder
3.86117647058823543.282
937482AD2-202 E
50/50
2.7272.727
3151581KERR 1
50/50
0.7110.711
3151601KERR 3
50/50
1.991.99
961792AG1-021 E
Adder
2.6317647058823532.237
3152661PLYWOOD A
50/50
2.4812.481
3147223TWITTYS
50/50
2.0152.015
959312AF2-222 E
50/50
23.29123.291
924022AB2-043 E O1
50/50
10.1410.14
316003AC1-222 C
50/50
2.0082.008
926024AC1-080 E
Adder
1.71529411764705891.458
936161AD2-022 C
Adder
12.41176470588235310.55
957601AF2-054 C
Adder
-1.72-1.462
316239AB2-077 C O1
50/50
0.6390.639
935171AD1-152 C
50/50
3.2363.236
942462AE2-259 E
Adder
10.6764705882352939.075
964791AG1-342 C
50/50
7.2097.209
925997AC1-075 E
Adder
5.1705882352941174.395
933291AC2-141 C
Adder
-31.96117647058824-27.167
964242AG1-285 E
50/50
19.04819.048
313527AB2-043 C
50/50
1.011.01
924162AB2-060 E OP
50/50
8.3338.333
3151591KERR 2
50/50
1.991.99
964792AG1-342 E
50/50
4.8064.806
932763AC2-100 E
50/50
5.1295.129
316283AC2-100 C
50/50
2.3312.331
937481AD2-202 C
50/50
0.9370.937
3151641KERR 7
50/50
1.991.99
3151041BRUNSWICKG3
50/50
25.63425.634
3151021BRUNSWICKG1
50/50
25.63425.634
957481AF2-042 C
50/50
147.496147.496
924322AB2-079 E O1
50/50
2.6052.605
946302AF1-294 E
Adder
5.377647058823534.571
943902AF1-058 E
50/50
2.7082.708
24401205PINNACLE
Adder
1.62588235294117631.382
316240AF1-291 C
Adder
-1.863529411764706-1.584
944641AF1-129 C
Adder
-87.13882352941177-74.068
925785AC1-054 E
Adder
3.75647058823529443.193
959311AF2-222 C
50/50
34.76234.762
942751AE2-291 C
Adder
13.03294117647058811.078
942001AE2-212 C
Adder
-1.9541176470588235-1.661
3151031BRUNSWICKG2
50/50
25.63425.634
957482AF2-042 E
50/50
98.33198.331
934621AD1-088 C
50/50
23.87723.877
935172AD1-152 E
50/50
13.31413.314
946301AF1-294 C
Adder
6.3505882352941185.398
942461AE2-259 C
Adder
16.0152941176470613.613
936162AD2-022 E
Adder
7.4470588235294126.33
CBM South 2LTFEXP_CBM-S2->PJM
CBM
169.426169.426
WECLTFEXP_WEC->PJM
CLTF
1.2081.208
LAGNLTFEXP_LAGN->PJM
CLTF
13.6813.68
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
2.2642.264
MECLTFEXP_MEC->PJM
CLTF
7.1897.189
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.4399.439
CBM West 2LTFEXP_CBM-W2->PJM
CBM
40.12440.124
NYPJM->LTFIMP_NY
CLTF
1.8831.883
TVALTFEXP_TVA->PJM
CLTF
10.7110.71
O66PJM->LTFIMP_O-066
CMTX_NF
26.2626.26
CBM West 1LTFEXP_CBM-W1->PJM
CBM
59.04159.041
G-007PJM->LTFIMP_G-007
CMTX_NF
4.1284.128
CPLELTFEXP_CPLE->PJM
CLTF
19.79519.795
SIGELTFEXP_SIGE->PJM
CLTF
0.4430.443

Details for AE2-094 TP-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 511_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 511_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:105.93 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4311.69
MW Contribution:19.28
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 511_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:112.26 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4569.37
MW Contribution:20.19
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
940641AE2-051 C
Adder
-20.06823529411765-17.058
934622AD1-088 E
50/50
10.02610.026
934611AD1-087 C
50/50
2.8252.825
934612AD1-087 E
50/50
8.158.15
3151611KERR 4
50/50
1.7561.756
927255AC1-221 E
50/50
6.8776.877
944012AF1-069 E
50/50
17.73117.731
316131AB2-060 C
50/50
2.5322.532
3138533PONTONDP
Adder
0.99529411764705880.846
316118AC1-105 C
50/50
1.6721.672
938531AE1-072 C
Adder
-15.17764705882353-12.901
3152411Z1-086 GT1
50/50
33.84633.846
3152421Z1-086 GT2
50/50
33.83433.834
924302AB2-077 E O1
50/50
2.2822.282
3151621KERR 5
50/50
1.7561.756
316222AC1-221 C
50/50
2.632.63
942752AE2-291 E
Adder
7.7105882352941186.554
3152431Z1-086 GT3
50/50
33.83433.834
3152441Z1-086 ST
50/50
58.91758.917
3147133PAMPLIN
50/50
1.5711.571
927264AC1-222 E
50/50
7.2547.254
963042AG1-153 E
50/50
25.80825.808
3151541CLOVER2
50/50
28.44128.441
964241AG1-285 C
50/50
24.94424.944
316034AC1-036 C
50/50
0.4320.432
958212AF2-115 E
Adder
2.86235294117647052.433
962561AG1-105 C
50/50
15.80415.804
936172AD2-023 E
Adder
3.7223529411764713.164
944011AF1-069 C
50/50
45.64245.642
963041AG1-153 C
50/50
17.20617.206
3151531CLOVER1
50/50
28.70728.707
936261AD2-033 C
50/50
21.05721.057
3151631KERR 6
50/50
1.7561.756
961791AG1-021 C
Adder
2.68823529411764732.285
962562AG1-105 E
50/50
10.53610.536
316248AF1-058 C
50/50
0.5870.587
936171AD2-023 C
Adder
6.8564705882352955.828
925612AC1-036 E
50/50
1.5841.584
316237AB2-079 C O1
50/50
0.5590.559
924312AB2-078 E O1
50/50
2.2822.282
316238AB2-078 C O1
50/50
0.5590.559
926274AC1-105 E
50/50
4.8944.894
941032AE2-094 E
50/50
62.56462.564
941031AE2-094 C
50/50
139.691139.691
3151051BRUNSWICKS1
50/50
52.76252.762
936262AD2-033 E
50/50
14.03814.038
958211AF2-115 C
Adder
3.362.856
937482AD2-202 E
50/50
2.3852.385
3151581KERR 1
50/50
0.6270.627
3151601KERR 3
50/50
1.7561.756
961792AG1-021 E
Adder
2.28941176470588251.946
3152661PLYWOOD A
50/50
2.1912.191
3147223TWITTYS
50/50
1.7561.756
959312AF2-222 E
50/50
20.29620.296
924022AB2-043 E O1
50/50
8.8758.875
316003AC1-222 C
50/50
1.7761.776
926024AC1-080 E
Adder
1.52117647058823541.293
936161AD2-022 C
Adder
11.7541176470588239.991
957601AF2-054 C
Adder
-1.6305882352941177-1.386
316239AB2-077 C O1
50/50
0.5590.559
935171AD1-152 C
50/50
2.8452.845
942462AE2-259 E
Adder
9.2458823529411777.859
964791AG1-342 C
50/50
6.3476.347
925997AC1-075 E
Adder
4.5835294117647063.896
933291AC2-141 C
Adder
-30.18235294117647-25.655
964242AG1-285 E
50/50
16.62916.629
313527AB2-043 C
50/50
0.8840.884
924162AB2-060 E OP
50/50
7.2927.292
3151591KERR 2
50/50
1.7561.756
964792AG1-342 E
50/50
4.2324.232
932763AC2-100 E
50/50
4.6444.644
316283AC2-100 C
50/50
2.112.11
937481AD2-202 C
50/50
0.820.82
3151641KERR 7
50/50
1.7561.756
3151041BRUNSWICKG3
50/50
25.39725.397
3151021BRUNSWICKG1
50/50
25.39725.397
957481AF2-042 C
50/50
128.648128.648
924322AB2-079 E O1
50/50
2.2822.282
946302AF1-294 E
Adder
4.6788235294117653.977
943902AF1-058 E
50/50
2.3942.394
24401205PINNACLE
Adder
1.53647058823529431.306
316240AF1-291 C
Adder
-1.7670588235294118-1.502
944641AF1-129 C
Adder
-82.61058823529412-70.219
925785AC1-054 E
Adder
3.30235294117647052.807
959311AF2-222 C
50/50
30.29330.293
942751AE2-291 C
Adder
11.5670588235294139.832
942001AE2-212 C
Adder
-1.851764705882353-1.574
3151031BRUNSWICKG2
50/50
25.39725.397
957482AF2-042 E
50/50
85.76685.766
934621AD1-088 C
50/50
20.82320.823
935172AD1-152 E
50/50
11.70511.705
946301AF1-294 C
Adder
5.5247058823529414.696
942461AE2-259 C
Adder
13.86823529411764811.788
936162AD2-022 E
Adder
7.0529411764705895.995
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5656
G-007PJM->LTFIMP_G-007
CMTX_NF
3.9723.972
CPLELTFEXP_CPLE->PJM
CLTF
19.02319.023
SIGELTFEXP_SIGE->PJM
CLTF
0.4210.421
CBM South 2LTFEXP_CBM-S2->PJM
CBM
162.815162.815
WECLTFEXP_WEC->PJM
CLTF
1.1471.147
LAGNLTFEXP_LAGN->PJM
CLTF
13.09813.098
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
2.1482.148
MECLTFEXP_MEC->PJM
CLTF
6.8436.843
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.0719.071
CBM West 2LTFEXP_CBM-W2->PJM
CBM
38.3338.33
NYPJM->LTFIMP_NY
CLTF
1.8141.814
TVALTFEXP_TVA->PJM
CLTF
10.24910.249
O66PJM->LTFIMP_O-066
CMTX_NF
25.2725.27
CONTINGENCY 'AEP_P1-2_#3174_6_SRT-A'
 OPEN BRANCH FROM BUS 242512 TO BUS 242515 CKT 1   /*05CLOVRD     765.0 - 05JOSHUA     765.0
END
CONTINGENCY 'DVP_P1-2: LN 556_SRT-S-3'
 OPEN BRANCH FROM BUS 313995 TO BUS 314936 CKT 1                /*8FINNEYWOOD  500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
CONTINGENCY 'DVP_P1-2: LN 562_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1                /*8CARSON      500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 314927 CKT 1 /*8SEPTA       500.0 - 8YADKIN      500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 314914 CKT 1 /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314923 TO BUS 314927 CKT 1 /*8SEPTA       500.0 - 8YADKIN      500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 314914 CKT 1 /*8CARSON      500.0 - 8MDLTHAN     500.0
END
CONTINGENCY 'DVP_P1-2: LN 585_SRT-A-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 941030 CKT 1   /*8CARSON      500.0 - AE2-094 TP   500.0
END
CONTINGENCY 'DVP_P1-2: LN 511_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314936 CKT 1                /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
242687 to 242734 ckt 1
242741 to 242687 ckt 1
314667 to 242741 ckt 1
314747 to 313867 ckt 1
314268 to 313802 ckt 1
313996 to 314268 ckt 1
313707 to 313373 ckt 1
313802 to 314692 ckt 1
314902 to 314914 ckt 1
314936 to 314902 ckt 1
941030 to 314902 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1DVP
3HUBER DP-3SEDGE HILL 115.0 kV Ckt 1 line
AEP_P1-2_#5366_42_SRT-A-1
OPAC100.93 %285.76B288.4151.57
GD1DVP
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC100.36 %678.68B681.17.99
GD1DVP
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC101.93 %661.76B674.528.31
GD1DVP
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 line
DVP_P1-2: LN 511_SRT-S
OPAC105.31 %4070.2B4286.2720.19
GD1DVP
AC1-222 TAP-3HUBER DP 115.0 kV Ckt 1 line
AEP_P1-2_#5366_42_SRT-A-1
OPAC101.1 %285.76B288.9151.57

Details for 3HUBER DP-3SEDGE HILL 115.0 kV Ckt 1 line l/o AEP_P1-2_#5366_42_SRT-A-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3HUBER DP-3SEDGE HILL 115.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#5366_42_SRT-A-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.93 %
Rating:285.76 MVA
Rating Type:B
MVA to Mitigate:288.41
MW Contribution:51.57
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
962751AG1-124 C
Adder
3.48588235294117642.963
962752AG1-124 E
Adder
2.43294117647058842.068
926646AC1-145 E
50/50
3.7973.797
942752AE2-291 E
50/50
20.62720.627
24684705SMG5
50/50
1.2521.252
24684605SMG4
50/50
3.2973.297
24684505SMG3
50/50
2.0262.026
942672AE2-283 E
50/50
5.5685.568
316217AC1-145 C
50/50
0.6890.689
942671AE2-283 C
50/50
6.2366.236
927264AC1-222 E
50/50
20.52320.523
24728405LEESVG
50/50
1.3291.329
941801AE2-185 C
50/50
8.0188.018
925665AC1-042 E
50/50
5.85.8
926516AC1-122_E
50/50
2.5722.572
24684405SMG2
50/50
3.2973.297
941802AE2-185 E
50/50
5.3455.345
270197AC1-083 C
50/50
0.840.84
926024AC1-080 E
50/50
4.1444.144
940081AE1-250 C
50/50
10.17910.179
925997AC1-075 E
50/50
12.4912.49
926055AC1-083 E
50/50
8.4158.415
316003AC1-222 C
50/50
5.0075.007
270173AC1-122 C
50/50
0.890.89
24684305SMG1
50/50
1.1971.197
3151561HALLBR1
50/50
2.242.24
940082AE1-250 E
50/50
6.7866.786
942751AE2-291 C
50/50
30.9430.94
316205AC1-080 C
50/50
1.1991.199
316123AC1-075 C
50/50
3.5893.589
316197AC1-042 C
50/50
0.5790.579
G-007PJM->LTFIMP_G-007
CMTX_NF
0.2550.255
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.7150.715
LAGNLTFEXP_LAGN->PJM
CLTF
0.1510.151
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.1270.127
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
1.2571.257
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.451.45
LGEELTFEXP_LGEE->PJM
CLTF
0.2620.262
TVALTFEXP_TVA->PJM
CLTF
0.1930.193
O66PJM->LTFIMP_O-066
CMTX_NF
1.6111.611
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.3476.347
NYPJM->LTFIMP_NY
CLTF
0.0970.097
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.2460.246
SIGELTFEXP_SIGE->PJM
CLTF
0.0410.041

Details for 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.36 %
Rating:678.68 MVA
Rating Type:B
MVA to Mitigate:681.1
MW Contribution:7.99
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316336AC2-165 C
50/50
14.92414.924
3151931BEARGRDN S1
50/50
17.62917.629
927255AC1-221 E
Adder
2.46000000000000042.091
934622AD1-088 E
50/50
5.1675.167
934612AD1-087 E
Adder
3.63882352941176463.093
316322AB2-045 C
50/50
0.6920.692
942752AE2-291 E
Adder
3.19647058823529442.717
924302AB2-077 E O1
Adder
1.27411764705882361.083
3138533PONTONDP
50/50
0.940.94
946282AF1-292 E
Adder
0.410588235294117640.349
958212AF2-115 E
50/50
2.7042.704
3144293JTRSVLE
50/50
0.5820.582
316034AC1-036 C
50/50
0.2820.282
964241AG1-285 C
Adder
13.1552941176470611.182
962561AG1-105 C
Adder
7.92823529411764756.739
946281AF1-292 C
Adder
0.61647058823529410.524
960082AF2-299 E
Adder
0.49647058823529410.422
316233AE1-074 C
Adder
0.89882352941176480.764
3147133PAMPLIN
50/50
1.4771.477
927264AC1-222 E
Adder
3.1717647058823532.696
966622AG1-532 E
Adder
0.371764705882352940.316
938821AE1-108 C
Adder
8.4470588235294127.18
925612AC1-036 E
50/50
1.0361.036
926274AC1-105 E
Adder
2.2752941176470591.934
924312AB2-078 E O1
Adder
1.27411764705882361.083
924032AB2-045 E
50/50
3.1133.113
961791AG1-021 C
50/50
2.5392.539
936261AD2-033 C
50/50
15.09515.095
962562AG1-105 E
Adder
5.2847058823529424.492
3151531CLOVER1
50/50
12.77812.778
960081AF2-299 C
Adder
0.74352941176470590.632
316258AE1-075 C
50/50
0.4390.439
923862AB2-026 E
50/50
1.5541.554
958211AF2-115 C
50/50
3.1743.174
936262AD2-033 E
50/50
10.06310.063
316405AF2-144 C
50/50
0.3730.373
961792AG1-021 E
50/50
2.1632.163
937482AD2-202 E
Adder
1.06470588235294120.905
926024AC1-080 E
Adder
0.64117647058823530.545
959312AF2-222 E
50/50
13.80113.801
3147223TWITTYS
50/50
1.1481.148
924022AB2-043 E O1
Adder
5.0035294117647064.253
966621AG1-532 C
Adder
0.55764705882352940.474
316313AB2-026 C
50/50
0.4780.478
3151921BEARGRDN G2
50/50
13.62713.627
942462AE2-259 E
50/50
11.20111.201
925997AC1-075 E
Adder
1.93411764705882351.644
964791AG1-342 C
Adder
3.1117647058823532.645
938552AE1-074 E
Adder
0.452941176470588240.385
938562AE1-075 E
50/50
1.3251.325
932763AC2-100 E
Adder
1.6270588235294121.383
964242AG1-285 E
Adder
8.7694117647058827.454
964792AG1-342 E
Adder
2.07411764705882361.763
924162AB2-060 E OP
Adder
4.20352941176470553.573
933502AC2-165 E
50/50
11.23311.233
3151911BEARGRDN G1
50/50
13.62713.627
946302AF1-294 E
50/50
4.424.42
943902AF1-058 E
Adder
1.05411764705882360.896
924322AB2-079 E O1
Adder
1.27411764705882361.083
957481AF2-042 C
50/50
55.82355.823
316088AB2-174 E
Adder
2.5788235294117652.192
923994AB2-040_E
Adder
2.42588235294117642.062
940451AE2-029 C
Adder
-2.1141176470588237-1.797
942751AE2-291 C
Adder
4.79529411764705854.076
959311AF2-222 C
50/50
20.59920.599
925785AC1-054 E
Adder
2.10941176470588231.793
3145723EMPORIA
Adder
0.171764705882352930.146
923573AB1-173 E OP
Adder
1.29411764705882361.1
958502AF2-144 E
50/50
1.5271.527
938822AE1-108 E
Adder
4.0305882352941183.426
942461AE2-259 C
50/50
16.80116.801
946301AF1-294 C
50/50
5.2195.219
935172AD1-152 E
Adder
5.0858823529411774.323
934621AD1-088 C
50/50
10.73210.732
957482AF2-042 E
50/50
37.21537.215
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.6212.621
NYPJM->LTFIMP_NY
CLTF
0.3550.355
MECLTFEXP_MEC->PJM
CLTF
0.1680.168
O66PJM->LTFIMP_O-066
CMTX_NF
4.2154.215
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6560.656
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0370.037
SIGELTFEXP_SIGE->PJM
CLTF
0.0040.004
CBM South 2LTFEXP_CBM-S2->PJM
CBM
25.67825.678
TVALTFEXP_TVA->PJM
CLTF
0.9450.945
LAGNLTFEXP_LAGN->PJM
CLTF
1.2491.249
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CPLELTFEXP_CPLE->PJM
CLTF
3.4493.449
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0950.095
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.6411.641

Details for 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:101.93 %
Rating:661.76 MVA
Rating Type:B
MVA to Mitigate:674.52
MW Contribution:8.31
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316336AC2-165 C
50/50
13.83813.838
3151931BEARGRDN S1
50/50
16.39816.398
927255AC1-221 E
Adder
2.3423529411764711.991
934622AD1-088 E
50/50
4.8524.852
934612AD1-087 E
Adder
3.42470588235294132.911
958131AF2-107 C
Adder
3.74941176470588243.187
316322AB2-045 C
50/50
0.6450.645
942752AE2-291 E
Adder
3.3235294117647062.825
924302AB2-077 E O1
Adder
1.19882352941176461.019
3138533PONTONDP
50/50
0.880.88
958212AF2-115 E
50/50
2.532.53
3144293JTRSVLE
50/50
0.5440.544
316034AC1-036 C
50/50
0.2640.264
964241AG1-285 C
Adder
12.3576470588235310.504
962561AG1-105 C
Adder
7.5094117647058836.383
958132AF2-107 E
Adder
2.0552941176470591.747
3147133PAMPLIN
50/50
1.3811.381
927264AC1-222 E
Adder
3.062.601
938821AE1-108 C
50/50
25.54125.541
925612AC1-036 E
50/50
0.9710.971
926274AC1-105 E
Adder
2.16588235294117661.841
924312AB2-078 E O1
Adder
1.19882352941176461.019
924032AB2-045 E
50/50
2.92.9
961791AG1-021 C
50/50
2.3762.376
936261AD2-033 C
50/50
14.15914.159
962562AG1-105 E
Adder
5.00588235294117644.255
3151531CLOVER1
50/50
12.02912.029
316258AE1-075 C
50/50
0.4060.406
923862AB2-026 E
50/50
1.4391.439
941012AE2-092 E
50/50
11.57411.574
958211AF2-115 C
50/50
2.972.97
936262AD2-033 E
50/50
9.4399.439
316405AF2-144 C
50/50
0.3450.345
941011AE2-092 C
50/50
17.36117.361
961792AG1-021 E
50/50
2.0242.024
937482AD2-202 E
Adder
1.00235294117647070.852
926024AC1-080 E
Adder
0.65058823529411770.553
959312AF2-222 E
50/50
12.93512.935
3147223TWITTYS
50/50
1.0771.077
924022AB2-043 E O1
Adder
4.7070588235294134.001
316313AB2-026 C
50/50
0.4430.443
3151921BEARGRDN G2
50/50
12.67512.675
942462AE2-259 E
50/50
10.46110.461
925997AC1-075 E
Adder
1.96235294117647061.668
964791AG1-342 C
Adder
2.9517647058823532.509
946302AF1-294 E
50/50
4.1364.136
943902AF1-058 E
Adder
1.00705882352941180.856
924322AB2-079 E O1
Adder
1.19882352941176461.019
957481AF2-042 C
50/50
52.49452.494
938562AE1-075 E
50/50
1.2271.227
932763AC2-100 E
Adder
1.55058823529411781.318
964242AG1-285 E
Adder
8.237647058823537.002
964792AG1-342 E
Adder
1.9682352941176471.673
924162AB2-060 E OP
Adder
3.95294117647058843.36
933502AC2-165 E
50/50
10.41510.415
3151911BEARGRDN G1
50/50
12.67512.675
940451AE2-029 C
Adder
-2.0752941176470587-1.764
942751AE2-291 C
Adder
4.9847058823529424.237
959311AF2-222 C
50/50
19.30519.305
925785AC1-054 E
Adder
1.98117647058823531.684
958502AF2-144 E
50/50
1.4141.414
938822AE1-108 E
50/50
12.18712.187
942461AE2-259 C
50/50
15.69115.691
946301AF1-294 C
50/50
4.8844.884
935172AD1-152 E
Adder
4.8023529411764714.082
934621AD1-088 C
50/50
10.07810.078
957482AF2-042 E
50/50
34.99634.996
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.5633.563
NYPJM->LTFIMP_NY
CLTF
0.3810.381
TVALTFEXP_TVA->PJM
CLTF
1.1431.143
O66PJM->LTFIMP_O-066
CMTX_NF
4.6624.662
CBM West 1LTFEXP_CBM-W1->PJM
CBM
1.2611.261
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7270.727
CPLELTFEXP_CPLE->PJM
CLTF
3.353.35
SIGELTFEXP_SIGE->PJM
CLTF
0.0210.021
CBM South 2LTFEXP_CBM-S2->PJM
CBM
25.74725.747
WECLTFEXP_WEC->PJM
CLTF
0.0350.035
LAGNLTFEXP_LAGN->PJM
CLTF
1.4791.479
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
0.0760.076
MECLTFEXP_MEC->PJM
CLTF
0.4090.409
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.5951.595

Details for 8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 511_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 511_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:105.31 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4286.27
MW Contribution:20.19
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316222AC1-221 C
50/50
2.6372.637
927255AC1-221 E
50/50
6.9166.916
316237AB2-079 C O1
50/50
0.4550.455
934622AD1-088 E
50/50
10.28810.288
934611AD1-087 C
50/50
2.842.84
934612AD1-087 E
50/50
8.2238.223
3151621KERR 5
50/50
1.6151.615
3151611KERR 4
50/50
1.6151.615
940641AE2-051 C
Adder
-21.040000000000003-17.884
942752AE2-291 E
Adder
8.0741176470588246.863
924302AB2-077 E O1
50/50
1.8631.863
316238AB2-078 C O1
50/50
0.4550.455
3152421Z1-086 GT2
50/50
33.46533.465
938531AE1-072 C
Adder
-16.01294117647059-13.611
3138533PONTONDP
Adder
0.85529411764705890.727
316131AB2-060 C
50/50
2.042.04
3151631KERR 6
50/50
1.6151.615
936172AD2-023 E
Adder
3.8505882352941183.273
958212AF2-115 E
Adder
2.45882352941176442.09
316034AC1-036 C
50/50
0.3110.311
316118AC1-105 C
50/50
1.5721.572
964241AG1-285 C
50/50
17.07617.076
962561AG1-105 C
50/50
14.10814.108
3151541CLOVER2
50/50
28.59928.599
963042AG1-153 E
50/50
25.65425.654
3147133PAMPLIN
Adder
1.261.071
927264AC1-222 E
50/50
7.1497.149
3152411Z1-086 GT1
50/50
33.47433.474
3152441Z1-086 ST
50/50
58.26658.266
925612AC1-036 E
50/50
1.1421.142
926274AC1-105 E
50/50
4.6164.616
924312AB2-078 E O1
50/50
1.8631.863
3152431Z1-086 GT3
50/50
33.46533.465
936171AD2-023 C
Adder
7.0929411764705886.029
961791AG1-021 C
Adder
2.30941176470588251.963
936261AD2-033 C
50/50
17.43217.432
316248AF1-058 C
50/50
0.5710.571
962562AG1-105 E
50/50
9.4059.405
3151531CLOVER1
50/50
28.86828.868
963041AG1-153 C
50/50
17.10317.103
964211AG1-282 C
Adder
-1.7011764705882353-1.446
958211AF2-115 C
Adder
2.88588235294117632.453
936262AD2-033 E
50/50
11.62211.622
3151051BRUNSWICKS1
50/50
52.26552.265
961792AG1-021 E
Adder
1.96705882352941171.672
3152661PLYWOOD A
50/50
2.0932.093
937482AD2-202 E
50/50
2.4072.407
3151021BRUNSWICKG1
50/50
25.15825.158
926024AC1-080 E
50/50
1.5621.562
936161AD2-022 C
Adder
12.15882352941176610.335
959312AF2-222 E
50/50
14.77814.778
3147223TWITTYS
50/50
1.2661.266
924022AB2-043 E O1
50/50
7.1597.159
935171AD1-152 C
50/50
2.8492.849
3151601KERR 3
50/50
1.6151.615
3151581KERR 1
50/50
0.5770.577
940081AE1-250 C
Adder
12.86117647058823510.932
942462AE2-259 E
Adder
8.1329411764705886.913
925997AC1-075 E
50/50
4.7084.708
964791AG1-342 C
50/50
5.7665.766
316239AB2-077 C O1
50/50
0.4550.455
3151041BRUNSWICKG3
50/50
25.15825.158
957601AF2-054 C
Adder
-1.8-1.53
24401205PINNACLE
Adder
1.6670588235294121.417
946302AF1-294 E
Adder
4.01882352941176453.416
316003AC1-222 C
50/50
1.7441.744
943902AF1-058 E
50/50
2.342.34
924322AB2-079 E O1
50/50
1.8631.863
957481AF2-042 C
50/50
129.887129.887
932763AC2-100 E
50/50
4.6734.673
964242AG1-285 E
50/50
11.38411.384
964792AG1-342 E
50/50
3.8443.844
924162AB2-060 E OP
50/50
5.8965.896
313527AB2-043 C
50/50
0.7110.711
3151641KERR 7
50/50
1.6151.615
3151031BRUNSWICKG2
50/50
25.15825.158
933291AC2-141 C
Adder
-32.203529411764706-27.373
944641AF1-129 C
Adder
-90.49176470588236-76.918
316240AF1-291 C
Adder
-1.9317647058823528-1.642
940082AE1-250 E
Adder
8.5741176470588247.288
942751AE2-291 C
Adder
12.11176470588235310.295
316205AC1-080 C
50/50
0.4520.452
316123AC1-075 C
50/50
1.3531.353
959311AF2-222 C
50/50
22.05622.056
937481AD2-202 C
50/50
0.8240.824
3151591KERR 2
50/50
1.6151.615
925785AC1-054 E
Adder
2.96470588235294132.52
942001AE2-212 C
Adder
-2.010588235294118-1.709
942461AE2-259 C
Adder
12.19882352941176510.369
936162AD2-022 E
Adder
7.29529411764705856.201
946301AF1-294 C
Adder
4.7458823529411774.034
316283AC2-100 C
50/50
2.1162.116
935172AD1-152 E
50/50
11.76211.762
934621AD1-088 C
50/50
21.36821.368
957482AF2-042 E
50/50
86.59186.591
CBM West 1LTFEXP_CBM-W1->PJM
CBM
71.06671.066
G-007PJM->LTFIMP_G-007
CMTX_NF
4.6814.681
CPLELTFEXP_CPLE->PJM
CLTF
19.41719.417
SIGELTFEXP_SIGE->PJM
CLTF
0.5240.524
CBM South 2LTFEXP_CBM-S2->PJM
CBM
170.641170.641
WECLTFEXP_WEC->PJM
CLTF
1.451.45
LAGNLTFEXP_LAGN->PJM
CLTF
14.84614.846
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
2.7422.742
MECLTFEXP_MEC->PJM
CLTF
8.3488.348
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.2639.263
CBM West 2LTFEXP_CBM-W2->PJM
CBM
44.76444.764
NYPJM->LTFIMP_NY
CLTF
2.1082.108
TVALTFEXP_TVA->PJM
CLTF
11.71211.712
O66PJM->LTFIMP_O-066
CMTX_NF
29.75629.756

Details for AC1-222 TAP-3HUBER DP 115.0 kV Ckt 1 line l/o AEP_P1-2_#5366_42_SRT-A-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AC1-222 TAP-3HUBER DP 115.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#5366_42_SRT-A-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:101.1 %
Rating:285.76 MVA
Rating Type:B
MVA to Mitigate:288.91
MW Contribution:51.57
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
962751AG1-124 C
Adder
3.48588235294117642.963
962752AG1-124 E
Adder
2.43294117647058842.068
926646AC1-145 E
50/50
3.7973.797
942752AE2-291 E
50/50
20.62720.627
24684705SMG5
50/50
1.2521.252
24684605SMG4
50/50
3.2973.297
24684505SMG3
50/50
2.0262.026
942672AE2-283 E
50/50
5.5685.568
316217AC1-145 C
50/50
0.6890.689
942671AE2-283 C
50/50
6.2366.236
927264AC1-222 E
50/50
20.52320.523
24728405LEESVG
50/50
1.3291.329
941801AE2-185 C
50/50
8.0188.018
925665AC1-042 E
50/50
5.85.8
926516AC1-122_E
50/50
2.5722.572
24684405SMG2
50/50
3.2973.297
941802AE2-185 E
50/50
5.3455.345
270197AC1-083 C
50/50
0.840.84
926024AC1-080 E
50/50
4.1444.144
940081AE1-250 C
50/50
10.17910.179
925997AC1-075 E
50/50
12.4912.49
316003AC1-222 C
50/50
5.0075.007
926055AC1-083 E
50/50
8.4158.415
270173AC1-122 C
50/50
0.890.89
24684305SMG1
50/50
1.1971.197
3151561HALLBR1
50/50
2.242.24
940082AE1-250 E
50/50
6.7866.786
942751AE2-291 C
50/50
30.9430.94
316205AC1-080 C
50/50
1.1991.199
316123AC1-075 C
50/50
3.5893.589
316197AC1-042 C
50/50
0.5790.579
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
WECLTFEXP_WEC->PJM
CLTF
0.1270.127
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
1.2571.257
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.451.45
LGEELTFEXP_LGEE->PJM
CLTF
0.2620.262
TVALTFEXP_TVA->PJM
CLTF
0.1930.193
O66PJM->LTFIMP_O-066
CMTX_NF
1.6111.611
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.3476.347
NYPJM->LTFIMP_NY
CLTF
0.0970.097
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.2460.246
SIGELTFEXP_SIGE->PJM
CLTF
0.0410.041
G-007PJM->LTFIMP_G-007
CMTX_NF
0.2550.255
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.7150.715
LAGNLTFEXP_LAGN->PJM
CLTF
0.1510.151
CONTINGENCY 'AEP_P1-2_#5366_42_SRT-A-1'
 OPEN BRANCH FROM BUS 242549 TO BUS 242632 CKT 1    /*05BANSTR     138.0 - 05EDAN 2     138.0
 OPEN BRANCH FROM BUS 242549 TO BUS 314668 CKT Z1   /*05BANSTR     138.0 - 4BANISTR     138.0
 OPEN BRANCH FROM BUS 242549 TO BUS 940080 CKT 1    /*05BANSTR     138.0 - AE1-250 TP   138.0
END
CONTINGENCY 'DVP_P1-2: LN 556_SRT-S-3'
 OPEN BRANCH FROM BUS 313995 TO BUS 314936 CKT 1                /*8FINNEYWOOD  500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
CONTINGENCY 'DVP_P1-2: LN 511_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314936 CKT 1                /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
313168 to 314696 ckt 1
313867 to 313707 ckt 1
313373 to 314765 ckt 1
314940 to 941030 ckt 1
316000 to 313168 ckt 1

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Light Load Analysis

The New Service Request AE2-291 was evaluated as a 102.0 MW injection in the Dominion area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Light Load Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Short Circuit Analysis

Based on PJM’s Short Circuit Analysis, this project did not contribute >1% fault duty to previously identified overdutied breakers, nor did it cause any new overdutied breakers.

Stability Analysis

Analysis Complete - No Issues

Executive Summary

New Service Requests (projects) in PJM Transition Cycle 1 Cluster 34 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 34 projects.

 

Table 1: Transition Cycle 1 Cluster 34 Projects

 

 

 

 

 

 

 

Cluster

Project

Fuel Type

Transmission Owner

MFO

(MW)

MWE

(MW)

MWC

(MW)

Point of Interconnection

34

AE1-148

Solar

Dominion

90

90

54

Kerr Dam-Ridge Rd

115 kV

AE2-291

Solar

Dominion

102

102

61.2

Grit DP-Perth 115 kV

AF2-297

Solar

Dominion

80

80

48

Sedge Hill 115 kV

AG1-105

Solar

Dominion

90

90

54

Mount Laurel-Barnes Junction 115 kV

AG1-342

Solar

Dominion

36

36

21.6

Dryburg 115 kV

 

 

This analysis is effectively a screening study to determine whether the addition of the Cluster 34 projects will meet the dynamics requirements of the NERC, Dominion Energy, and PJM reliability standards.

 

The load flow case for Phase 2 was used as a starting point and was updated based on latest Cluster 34 data, recommended transmission changes incorporated based on Dominion Energy Phase 2 feedback, and withdrawn generation removed. Cluster 34 projects have been dispatched online at maximum power output with near unity power factor measured at the high-side of the main substation transformer. The dynamic models for Cluster 34 projects were updated based on the latest DP2 data and include any tuning adjustments recommended during Phase 2.  

 

Cluster 34 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. During the Phase 2 analysis contingencies were examined around the POIs and no violations were observed as a result of Cluster 34 projects interconnecting.  Due to this the Phase 3 analysis for Cluster 34 focused on the contingencies at Chase City that resulted in instability caused by Cluster 31 and Cluster 40 during Phase 2.  The Phase 3 analysis examined 217 sensitivity contingencies, each with a 30 second simulation time period. The studied contingencies included:

 

  • Steady-state operation (30 seconds)
  • Three-phase faults with normal clearing time
  • Single-phase bus faults with normal clearing time
  • Single-phase faults with stuck breaker
  • Single-phase faults with delayed clearing at remote end
  • Three-phase faults with loss of multiple-circuit tower line

 

Instability was observed for contingencies when the Chase City to AG1-285 Tap 115 kV circuit was tripped. This outage resulted in instability due to insufficient export paths for the generation along the Farmville to Chase City 115 kV path through the radial connection.  Additionally, the Farmville to Chase City 115 kV path is prone to controller instability due to weak grid conditions determined by the composite short circuit ratio assessment.  The instability was caused by the Cluster 31 queue projects. 

  

To following mitigation was tested and all maintain stability: 

  1. Adding a new 115 kV line from AG1-285 to Butcher’s Creek. 
  2. Moving AF2-222 and AG1-285 to a new 230 kV line from Farmville to Finneywood. 
  3. Updating the new AG1-285 230 kV substation to breaker and a half scheme to accommodate 2 x 230/115 kV AG1-285 transformers, and a 230 kV line from AG1-285 to Finneywood. 

 

The Transmission Owner selected the 3rd mitigation option, which updated the new AG1-285 230 kV substation to a breaker and a half scheme to accommodate 2 x 230/115 kV AG1-285 transformers, and a 230 kV line from AG1-285 to Finneywood. to maintain stability. This mitigation is required due to the interconnection of the Cluster 31 queue projects. Cluster 34 queue projects did not cause instability.

 

The REGCA1 Accel (CON J+13) parameter was set to 0.7 to improve PSS/E network solution calculations for all IBRs located in dispatch area.

 

Voltage oscillations were observed at Altavista 69 kV. It is determined that Smith Mountain, AEP generator, is the source of this oscillation. Gnetting the Smith Mountain generators improved PSS/E network solution calculations. It is recommended for Smith Mountain dynamic model to be revised.

 

Nearby projects were found to trip based on their protection settings. The protection trip times were increased during Phase 2 analysis and maintained during the Phase 3 analysis:

  • AD2-033 tripped for overvoltage protection model for voltage above 1.4 p.u. and the time delay setting was update from 0.001 to 0.0208 seconds.
  • AE2-185 tripped for overvoltage protection model for voltage above 1.2 p.u. and the time delay setting was update from 0.001 to 0.0542 seconds.
  • AE2-187 tripped for overvoltage protection model for voltage above 1.175 p.u. and the time delay setting was update from 0.21 to 0.4042 seconds.
  • AE2-187 tripped for overvoltage protection model for voltage above 1.2 p.u. and the time delay setting was update from 0.001 to 0.3875 seconds.
  • AE2-283 tripped for underfrequency protection model for frequency below 55 Hz and the time delay settings was updated from 0.01 to 0.0167 seconds.
  • AF2-404 tripped for underfrequency protection model for frequency below 55 Hz and the time delay settings was updated from 0.01 to 0.0167 seconds.  

 

With the mitigation identified above, the results of the contingencies tested on the RTEP 2027 summer peak case found: 

 

  • Cluster 34 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),
  • The system with Cluster 34 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for inter area modes and 4% for local modes in Dominion area.
  • Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds,  except where protective action isolates that bus.
  • For Dominion area, the final voltages are within the steady-state voltage ranges below per Dominion Energy’s transmission planning criteria.
    • P1 Category Contingencies:
      • 0.93 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.93 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.01 to 1.096 p.u. for 500 kV facilities
    • P2, P4, P5, and P7 Category Contingencies:
      • 0.90 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.90 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.00 to 1.096 p.u. for 500 kV facilities
  • No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

It is recommended that future model submissions be validated with the settings proposed in this study. If model data and settings differ, then a transient stability study is recommended to validate the new model data and settings.

 

No mitigation was needed to connect the Cluster 34 queue projects. 

Reactive Power Analysis

The reactive power capability of AE2-291 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AA2-057Hornertown-Whitakers 115kVIn Service
AB1-081Anaconda-Mayo Dunbar 115kVIn Service
AB1-132Thelma 230kVIn Service
AB1-173Brink-Trego 115kVIn Service
AB2-040Brink 115kVIn Service
AB2-043Chase City 115kVIn Service
AB2-045Buckingham 34.5kVIn Service
AB2-059Benson-Dunbar 115kVIn Service
AB2-060Chase City-Lunenburg 115kVIn Service
AB2-077Buggs Island-Chase City 115kVIn Service
AB2-078Buggs Island-Chase City 115kVIn Service
AB2-079Buggs Island-Chase City 115kVIn Service
AB2-174Emporia-Trego 115kVIn Service
AC1-034Heartsease DP - Mayo Dunbar 115kVEngineering & Procurement
AC1-036Twittys Creek 34.5kVIn Service
AC1-042Altavista-Mt. Airy 69kVIn Service
AC1-054Kerr Dam–Eatons Ferry 115 kVIn Service
AC1-075Perth-Hickory Grove 115kVIn Service
AC1-080Perth-Hickory Grove 115kVIn Service
AC1-083Smith Mountain-Bearskin 138kVIn Service
AC1-086Thelma 230kVUnder Construction
AC1-098Dawson-South Justice 115kVIn Service
AC1-099Dawson-South Justice 115kVIn Service
AC1-105Halifax-Mt. Laurel 115kVIn Service
AC1-145Gretna DP 69 kVIn Service
AC1-208Cox-Whitakers 115kVUnder Construction
AC1-221Halifax-Person 230kVIn Service
AC1-222Crystal Hill-Halifax 115kVIn Service
AC2-084Dawson-South Justice 115kVIn Service
AC2-100Halifax-Person 230kVIn Service
AC2-165Bremo-Powhatan 230kVSuspended
AD1-056Hornertown-Hathaway 230 kVSuspended
AD1-057Hornertown-Hathaway 230 kVSuspended
AD1-087Clover-Sedge Hill 230 kVIn Service
AD1-088Briery-Clover 230 kVSuspended
AD1-152Clover-Sedge Hill 230 kVIn Service
AD2-022East Danville - Roxborough 230 kVEngineering & Procurement
AD2-023East Danville - Roxborough 230 kVEngineering & Procurement
AD2-033Chase City-Lunenburg 115 kVUnder Construction
AD2-202Clover-Sedge Hill 230kVIn Service
AE1-108Bremo-Scottsville 138 kVUnder Construction
AE1-250Smith Mountain-E. Danville 138 kVUnder Construction
AE2-092Kidds Store-Sherwood 115 kVEngineering & Procurement
AE2-185Gladys DP-Stonemill Switching Station 69 kVEngineering & Procurement
AE2-259Curdsville-Willis Mtn 115 kVEngineering & Procurement
AE2-283Gladys-Stone Mill 69 kVEngineering & Procurement
AF1-058Welco 34.5 kVIn Service
AF1-292Fields 34.5kVUnder Construction
AF1-294Jetersville-Ponton 115 kVEngineering & Procurement
AF2-042Clover-Rawlings 500 kVEngineering & Procurement
AF2-115Jetersville-Ponton 115 kVEngineering & Procurement
AF2-222Madisonville DP-Twitty's Creek 115 kVEngineering & Procurement
AF2-299Fields 34.5 kVEngineering & Procurement
AG1-021Jetersville-Ponton 115 kVEngineering & Procurement
AG1-105Mount Laurel-Barnes Junction 115 kVUnder Construction
AG1-285Chase City-Central 115 kVEngineering & Procurement
AG1-342Dryburg 115 kVEngineering & Procurement
AG1-532Fields 34.5 kVUnder Construction
Z2-044Whitakers 34.5kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In coordination with other Affected System Operators, PJM has determined that the Affected System Operator for this project that requires an Affected System Study. For the latest Affected System Study results pertaining this project, please refer to your Affected System Study report by the Affected System Operator. If the Affected System Operator identified the need for a system reinforcement on their system due to their planning criteria, Project Developer must follow the Affected System Operator Tariff for construction of the network upgrade. PJM lists any required network upgrades identified by the Affected System Operator in the PJM Project Developer’s GIA under Schedule F.

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Final System Impact Study analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AE2-291 System Reinforcements:
TORTEP IDTitleCategoryAllocated Cost ($USD)Facilities Study
Dominionn9220.0Wreck and rebuild 15.49 miles of 230 kV Line #298 from Buckingham to Bremo Substations with twin bundled (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor.Cost Allocated$1,705,384
Dominionn9217.0Wreck and rebuild 12.73 miles of 230 kV Line 298 from Buckingham to Farmville Substations with twin bundled (2) 768 ACSS/TW (20/7) "MAUMEE" conductor.Cost Allocated$1,550,409
AEPb4000.211Rebuild 6.5 miles of Johnson Mountain - New London 138 kV lineContingent$0N/A
AEPb4000.210Rebuild 7 miles of Otter - Johnson Mountain 138 kV line.Contingent$0N/A
AEPn5613Rebuild 0.9 miles of the Otter - Alta Vista 138 kV line.Contingent$0N/A
Dominionn8492.2Expand Yadkin Substation to accommodate the new 500 kV line.Non-Contingent$0N/A
Dominionn9259.0Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.Non-Contingent$0N/A
Dominionn9267.0Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.Non-Contingent$0N/A
Dominionn9630.0Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.Non-Contingent$0N/A
Dominionb4000.357Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.Non-Contingent$0N/A
Dominionb4000.356Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).Non-Contingent$0N/A
Dominionb4000.355Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).Non-Contingent$0N/A
Dominionb4000.352Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.Non-Contingent$0N/A
Dominionb4000.351Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).Non-Contingent$0N/A
Dominionb4000.350Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).Non-Contingent$0N/A
Dominionb4000.349Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).Non-Contingent$0N/A
Dominionb4000.348Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.Non-Contingent$0N/A
Dominionb4000.346Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substationNon-Contingent$0N/A
Dominionb4000.345Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.Non-Contingent$0N/A
Dominionb4000.344Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.Non-Contingent$0N/A
Dominionb4000.342Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.Non-Contingent$0N/A
Dominionb4000.341Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.Non-Contingent$0N/A
Dominionb4000.325Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.Non-Contingent$0N/A
Dominionb4000.326At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.Non-Contingent$0N/A
Dominionb4000.327Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.Non-Contingent$0N/A
Dominions3047.2Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.Non-Contingent$0N/A
Dominionb3800.312Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.Non-Contingent$0N/A
Dominionb3800.313Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.Non-Contingent$0N/A
Dominionb3800.356Build a new 500 kV line from Vint Hill to Wishing Star.Non-Contingent$0N/A
Dominionb3800.357Build a new 500 kV line from Morrisville to Vint Hill.Non-Contingent$0N/A
Dominionb3800.354Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.Non-Contingent$0N/A
Dominionn8492Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.Non-Contingent$0N/A
Dominionn8492.1Two Breaker Additions at Fentress Substation.Non-Contingent$0N/A
Grand Total:$3,255,793

PJM evaluated the impact of topology changing reinforcements to mitigate the impacts driven by New Service Requests. PJM determined which reinforcements were eliminated as a result of modeling the topology changing reinforcements. PJM then grouped the topology changing and eliminated reinforcements by region and computed a discount factor to apply to reinforcements to reduce the cost of all these reinforcements down to the cost of contstructing only the topology changing reinforcements. For additional details, please click the icon below

Regional Topology Upgrade Conversion

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n9220.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9220.0 / TC1-PH2-DOM-033
Title
Wreck and rebuild 15.49 miles of 230 kV Line #298 from Buckingham to Bremo Substations with twin bundled (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor.
Description
Wreck and rebuild 15.42 miles of 230 kV Line #298 from Buckingham to Bremo Substations with twin bundled (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor.
Total Cost ($USD)
$44,465,922
Discounted Total Cost ($USD)
$44,465,922
Allocated Cost ($USD)
$1,705,384
Time Estimate
42 to 48 Months

Contributor

FacilityContingency
6BUCKING-6BREMO 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A796.0 MVA
(All)B796.0 MVA
(All)C964.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AE2-29113.6 MW3.8%$1,705,384
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
17.8 MW5.0%$2,229,393
AF2-042163.5 MW46.2%$20,532,412
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
10.8 MW3.1%$1,359,435
AF2-22265.0 MW18.3%$8,159,120
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
8.7 MW2.4%$1,087,573
AG1-10523.6 MW6.7%$2,967,877
AG1-28541.9 MW11.8%$5,264,576
AG1-3429.2 MW2.6%$1,160,153

System Reinforcement: n9217.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9217.0 / TC1-PH2-DOM-028
Title
Wreck and rebuild 12.73 miles of 230 kV Line 298 from Buckingham to Farmville Substations with twin bundled (2) 768 ACSS/TW (20/7) "MAUMEE" conductor.
Description
Wreck and rebuild 12.73 miles of 230 kV Line 298 from Buckingham to Farmville Substations with twin bundled (2) 768 ACSS/TW (20/7) "MAUMEE" conductor.
Total Cost ($USD)
$40,414,822
Discounted Total Cost ($USD)
$40,414,822
Allocated Cost ($USD)
$1,550,409
Time Estimate
45 to 46 Months

Contributor

FacilityContingency
6BUCKING-6FARMVIL 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A797.0 MVA
(All)B797.0 MVA
(All)C1116.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AE2-29113.6 MW3.8%$1,550,409
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
17.8 MW5.0%$2,026,247
AF2-042163.5 MW46.2%$18,661,737
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
10.8 MW3.1%$1,235,466
AF2-22265.0 MW18.3%$7,415,536
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
8.7 MW2.4%$988,419
AG1-10523.6 MW6.7%$2,697,555
AG1-28541.9 MW11.8%$4,784,850
AG1-3429.2 MW2.6%$1,054,602

System Reinforcement: b4000.211
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b4000.211
Title
Rebuild 6.5 miles of Johnson Mountain - New London 138 kV line
Description
Rebuild 6.5 miles of Johnson Mountain - New London 138 kV line Projected In Service Date: 06/01/2029
Cost Information
Time Estimate
Jun 01 2029

Contingent

Note: Although AE2-291 may not presently have cost responsibility for this upgrade, AE2-291 may need this upgrade in-service to be deliverable to the PJM system. If AE2-291 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A297.0 MVA
(All)B330.0 MVA

System Reinforcement: b4000.210
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b4000.210
Title
Rebuild 7 miles of Otter - Johnson Mountain 138 kV line.
Description
Rebuild 7 miles of Otter - Johnson Mountain 138 kV line.
Cost Information
Time Estimate
Jun 01 2029

Contingent

Note: Although AE2-291 may not presently have cost responsibility for this upgrade, AE2-291 may need this upgrade in-service to be deliverable to the PJM system. If AE2-291 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
05JOHNMT-05OTTER 138.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A297.0 MVA
(All)B414.0 MVA

System Reinforcement: n5613
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n5613 / AEPA0014a
Title
Rebuild 0.9 miles of the Otter - Alta Vista 138 kV line.
Description
Rebuild 0.9 miles of the Otter - Alta Vista 138 kV line.
Total Cost ($USD)
$2,740,849
Discounted Total Cost ($USD)
$2,740,849
Allocated Cost ($USD)
$0
Time Estimate
Nov 21 2027

Contingent

Note: Based on PJM cost allocation criteria, AE2-291 does not receive cost allocation towards this upgrade which has been securitized by a prior Queue/Cycle. Although AE2-291 may not have cost responsibility for this upgrade, AE2-291 may need this upgrade in-service to be deliverable for the reliability to the PJM system. If AE2-291 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
05OTTER-4ALTVSTA 138.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A257.0 MVA
(All)B360.0 MVA

System Reinforcement
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
(Pending)
Title
Most limiting rating on the Dominion side is the Wave Trap and Lead at Altavista: 363 / 382 /420 MVA.
Description
Most limiting rating on the Dominion side is the Wave Trap and Lead at Altavista: 363 / 382 /420 MVA.
Total Cost ($USD)
$0
Discounted Total Cost ($USD)
$0
Allocated Cost ($USD)
$0
Time Estimate
99 Months

Note: This reinforcement is fictitious and will not be cost allocated to projects. It is listed for information purposes only.

FacilityContingency
05OTTER-4ALTVSTA 138.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A363.0 MVA
(All)B382.0 MVA
(All)C420.0 MVA

System Reinforcement: n9138.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9138.0 / TC1-PH1-DOM-070
Title
ELIM TC1: Wreck and rebuild 22.59 miles of Line #511 between Carson and Rawlings Substations with three (3) 1351 ACSS/TW and associated substation work.
Description
Wreck and rebuild 22.59 miles of Line 511 between Carson and Rawlings with three (3) 1351 ACSS/TW and associated substation work.
Total Cost ($USD)
$111,130,292
Discounted Total Cost ($USD)
$111,130,292
Allocated Cost ($USD)
$0
Time Estimate
60 to 61 Months

Potential Aggregate ContributorEliminated

Note 1: Based on PJM cost allocation criteria, AE2-291 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AE2-291 could receive cost allocation. Although AE2-291 may not presently have cost responsibility for this upgrade, AE2-291 is a potential Aggregate Pool Contributor.

Note 2: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle.

FacilityContingency
8CARSON-8RAWLINGS 500.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-C
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-A
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 51192_SRT-S
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 51172_SRT-S
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 511T544_SRT-S
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-C
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-A
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA

System Reinforcement: n9250.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9250.0 / TC1-PH2-DOM-044
Title
ELIM TC1: Construct a new 22.59 mile line between Carson and Rawlings Substations.
Description
Construct a new 22.59 mile line between Carson and Rawlings Substations.
Total Cost ($USD)
$108,728,086
Discounted Total Cost ($USD)
$108,728,086
Allocated Cost ($USD)
$0
Time Estimate
60 to 61 Months

Potential Aggregate ContributorEliminated

Note 1: Based on PJM cost allocation criteria, AE2-291 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AE2-291 could receive cost allocation. Although AE2-291 may not presently have cost responsibility for this upgrade, AE2-291 is a potential Aggregate Pool Contributor.

Note 2: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle.

FacilityContingency
8CARSON-8RAWLINGS 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-C
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-A
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 51192_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 51172_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 511T544_SRT-S
No new ratings for this Flowgate.
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-C
No new ratings for this Flowgate.
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-A
No new ratings for this Flowgate.
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
No new ratings for this Flowgate.

System Reinforcement: n8492.2

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n8492.2
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.2
Title
Expand Yadkin Substation to accommodate the new 500 kV line.
Description
Expansion of yadkins 500 kV switchyard to accommodate the new 500 kV line which includes addition of 5000 amp GIS breakers and relocation of the existing suffolk -yadkin 500 kV line#565
Total Cost ($USD)
$16,207,123
Allocated Cost ($USD)
$0
Time Estimate
Dec 31 2026
Cost Alloc Type
Non-Contingent

System Reinforcement: n9259.0

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9259.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9259.0
Title
Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.
Description
Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.
Total Cost ($USD)
$25,304,902
Allocated Cost ($USD)
$0
Time Estimate
Jan 01 2030
Cost Alloc Type
Non-Contingent

System Reinforcement: n9267.0

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9267.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9267.0 / TC1-PH2-DOM-067
Title
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.
Description
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner substations with single (1) 768.2 ACSS/TW “Maumee” at 250 degrees C. This new line will be on separate transmission towers from the existing Northern Neck and Moon Corner line 1059. Station expansion is required at Northern Neck and Moon Corner to accommodate the new line.
Total Cost ($USD)
$45,730,074
Allocated Cost ($USD)
$0
Time Estimate
45 to 46 Months
Cost Alloc Type
Non-Contingent

System Reinforcement: n9630.0

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9630.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9630.0 / TC1-PH3-DOM-013
Title
Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.
Description
n9630.0 addresses both stability and load flow violations. Construct a new 230 kV Line from the AG1-285 substation to the 230 kV Finneywood substation following the Line 1012 ROW for approximately 1.0 miles, then following the Line 556 ROW for approximately 3.5 miles to terminate at Finneywood. Expand the AG1-285 115 kV substation to accommodate two (2) new 115/230 kV transformers. Build a 230 kV substation at AG1-285 to connect the 115/230 kV transformers and the new 230 kV line to Finneywood. Expand the Finneywood 230 kV substation to accommodate the new line. The existing 1.0 miles of 115 kV from AG1-285 to Chase City does not need to be rebuilt to accommodate a new structure in the same right of way and therefore will be unchanged. The existing 3.5 miles of 500 kV towers from Structure 556/46 to Finneywood substation will need to be rebuilt as a double circuit tower to accommodate the new 230 kV line.
Total Cost ($USD)
$71,697,833
Allocated Cost ($USD)
$0
Time Estimate
Dec 31 2029
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.357

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.357
Title
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Description
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.356

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.356
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.356
Title
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
Description
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.355

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.355
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.355
Title
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
Description
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.352

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.352
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.352
Title
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.
Description
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.351

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.351
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.351
Title
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).
Description
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.350

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.350
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.350
Title
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).
Description
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.349

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.349
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.349
Title
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).
Description
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.348

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.348
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.348
Title
Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.
Description
Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. A new redundant breaker ring will be added at Thornburg (formerly Kraken) to accommodate the new 500kV line from North Anna to Thornburg (formerly Kraken).
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.346

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.346
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.346
Title
Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substation
Description
Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substation
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.345

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.345
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.345
Title
Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.344

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.344
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.344
Title
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.342

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.342
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.342
Title
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Description
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.341

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.341
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.341
Title
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.
Description
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV substation and extend approximately 0.2 miles of conductor to fly-over the site.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.325

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.325
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.325
Title
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Description
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.326

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.326
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.326
Title
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Description
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.327

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.327
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.327
Title
Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.
Description
Upgrade/install equipment at Ladysmith substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230kV strings of breaker and a half scheme.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: s3047.2

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: s3047.2
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
s3047.2
Title
Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.
Description
Install (2) 1400 MVA 500-230 kV transformers and associated 500 kV and 230 kV equipment (breakers, switches, leads) at Vint Hill Substation to supply the area with a 500 kV source Cut and loop 500 kV line #535 Loudoun – Meadowbrook and #569 Loudoun - Morrisville as the 500 kV sources into the proposed 500 kV ring bus Vint Hill Substation will be expanded to the north of the existing site to accommodate the 500 kV ring required for the addition of the new transformers Existing terminations for 230 kV line #2174 Wheeler – Vint Hill, line #2101 Bristers – Vint Hill, and line #2163 Liberty – Vint Hill will be rearranged to terminate into the expanded Vint Hill Substation 230 kV line #2114 Remington CT – Rollins Ford will also be cut and looped into the expanded Vint Hill Substation due to spatial constraints along the existing right-of-way.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.312

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.312
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.312
Title
Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.
Description
Rebuild 500kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way. New conductor to have a summer rating of 4357 MVA.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.313

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.313
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.313
Title
Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.
Description
Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.356

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.356
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.356
Title
Build a new 500 kV line from Vint Hill to Wishing Star.
Description
Build a new 500kV line from Vint Hill to Wishing Star. The line will be supported on single circuit monopoles. New conductor to have a summer rating of 4357 MVA. Line length is approximately 16.59 miles
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.357

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.357
Title
Build a new 500 kV line from Morrisville to Vint Hill.
Description
Build a new 500kV line from Morrisville to Vint Hill. New conductor to have a summer rating of 4357 MVA. Line length is approximately 19.71 miles.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.354

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.354
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.354
Title
Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.
Description
Install terminal equipment at Wishing Star substation to support a 5000A line to Vint Hill. Update relay settings for 500kV Lines #546 and #590.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: n8492

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n8492
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492
Title
Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.
Description
Wreck and rebuild one (1) overhead 500kV transmission line that will start at the existing Fentress 500 kV Substation and terminate at the existing Yadkin 500 kV Substation, located approximately 13.5 miles away.
Total Cost ($USD)
$80,172,278
Allocated Cost ($USD)
$0
Time Estimate
Dec 31 2026
Cost Alloc Type
Non-Contingent

System Reinforcement: n8492.1

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n8492.1
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.1
Title
Two Breaker Additions at Fentress Substation.
Description
Install Two 5000 amp GIS Breakers at Fentress Substation to connect the new 500 kV line 5005.
Total Cost ($USD)
$19,945,879
Allocated Cost ($USD)
$0
Time Estimate
Dec 31 2026
Cost Alloc Type
Non-Contingent

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AE2-291


AE2-291 Contributions into Topology or Eliminated Reinforcements:
TypeTORTEP ID / TO IDTitleTopo or ElimMW ImpactPercent AllocationCategoryAllocated Cost ($USD)
Contributions into Topology or Eliminated Reinforcement Total:$0
AE2-291 Contingent Region Topology Upgrades:
TORTEP IDTitleCategoryAllocated Cost ($USD)
Dominionn8492.2Expand Yadkin Substation to accommodate the new 500 kV line.Non-Contingent$0
Dominionn9259.0Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.Non-Contingent$0
Dominionn9267.0Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.Non-Contingent$0
Dominionn9630.0Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.Non-Contingent$0
Dominionb4000.357Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.Non-Contingent$0
Dominionb4000.356Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).Non-Contingent$0
Dominionb4000.355Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).Non-Contingent$0
Dominionb4000.352Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.Non-Contingent$0
Dominionb4000.351Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).Non-Contingent$0
Dominionb4000.350Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).Non-Contingent$0
Dominionb4000.349Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).Non-Contingent$0
Dominionb4000.348Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.Non-Contingent$0
Dominionb4000.346Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substationNon-Contingent$0
Dominionb4000.345Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.Non-Contingent$0
Dominionb4000.344Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.Non-Contingent$0
Dominionb4000.342Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.Non-Contingent$0
Dominionb4000.341Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.Non-Contingent$0
Dominionb4000.325Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.Non-Contingent$0
Dominionb4000.326At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.Non-Contingent$0
Dominionb4000.327Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.Non-Contingent$0
Dominions3047.2Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.Non-Contingent$0
Dominionb3800.312Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.Non-Contingent$0
Dominionb3800.313Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.Non-Contingent$0
Dominionb3800.356Build a new 500 kV line from Vint Hill to Wishing Star.Non-Contingent$0
Dominionb3800.357Build a new 500 kV line from Morrisville to Vint Hill.Non-Contingent$0
Dominionb3800.354Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.Non-Contingent$0
Dominionn8492Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.Non-Contingent$0
Dominionn8492.1Two Breaker Additions at Fentress Substation.Non-Contingent$0
Region Topology Upgrade Total:$0

Attachments

AE2-291 One Line Diagram

AE2-291 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.