AE2-291 Final System Impact Study (Retool 1) Report

v1.00 released 2025-12-08 18:15

Grit DP-Perth 115 kV

61.2 MW Capacity / 102.0 MW Energy

Introduction

This Final System Impact Study (SIS) Report has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 314 for New Service Requests (projects) in Transition Cycle 1 (TC1). The Project Developer/Eligible Customer (developer) is Hillandale Solar, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Virginia Electric and Power Company (d/b/a Dominion Energy Virginia).

Preface

The Final System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Final System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 5, Final Agreement Negotiation Phase, the purpose of the Final Agreement Negotiation Phase is to:

  1. Negotiate, execute and enter into the applicable final interconnection related service agreement found in Tariff, Part IX;
  2. Conduct any remaining analyses or updated analyses based on New Service Requests withdrawn during Decision Point III (DP3); and
  3. Adjust the security obligation based on New Service Requests withdrawn during Decision Point III and/or during the Final Agreement Negotiation Phase.
Retool 1:

In accordance with PJM Tariff Part VII.D 314 B(1)(a), Final Agreement Negotiation Phase:

  • PJM will perform a retool (Retool 1) after the conclusion of DP3 considering only the TC1 projects moving on in the Final Agreement Negotiation Phase (Removes DP3 withdrawals).
  • The Final System Impact Study reflecting results from the retooled analysis (Retool 1) will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • PJM will provide updated final electronic agreements to Project Developers and Eligible Customers in the Cycle reflecting updates from the Final System Impact Study after Retool 1 including the adjusted Security requirements.
Retool 2 (if needed):

If particular New Service Requests do not sign their final agreements after receiving the updated information after Retool 1, there may be the need to run a second retool (Retool 2) to identify if any network upgrades are no longer necessary:

  • PJM will perform Retool 2 (if necessary) considering only the removal of TC1 projects from the model which chose not to execute their agreements after Retool 1.
  • The updated Final System Impact Study reflecting results from Retool 2 will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • If there are any adjustments to the agreements required after Retool 2, the necessary network upgrade or Security changes will be handled via the scope change process post-GIA.

General

The Project Developer has proposed a Solar generating facility located in the Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) zone — Pittsylvania County, Virginia. The installed facilities will have a total capability of 102.0 MW with 61.2 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AE2-291
Project Name:
Grit DP-Perth 115 kV
Project Developer Name:
Hillandale Solar, LLC
State:
Virginia
County:
Pittsylvania
Transmission Owner:
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
MFO:
102.0
MWE:
102.0
MWC:
61.2
Fuel Type:
Solar
Basecase Study Year:
2027

Physical Interconnection Facility Study

Received

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AE2-291 will interconnect with the Dominion’s Grit DP-Perth 115 kV transmission line through a new three breaker 115 kV switching station.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. The Facilities Studies for the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades were performed by the Transmission Owner in Phase II. Facilities Studies are available for download on PJM.com (see General Section for document links). The Interconnected Transmission Owner has performed a Facilities Study for the required System Reliability Network Upgrades in Phase III (see System Reinforcement Section for document links).

Based on the Final SIS results, the AE2-291 project has the following allocation of costs for interconnection. The Security amount required after the Final SIS and revised agreements is also shown below.

Cost Summary
DescriptionCost Allocated to AE2-291Cost Subject to Security*
Transmission Owner Interconnection Facilities (TOIF)$1,091,112$1,091,112
Other Scope$0$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$11,567,967$11,567,967
Network Upgrades$4,104,725$4,104,725
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$3,255,793$3,255,793
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$20,019,597$20,019,597

* Contributes to calculation for Security. See Security Section of this report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Security Requirement

Per Tariff Part VII, Subpart D, section 314 (Final Agreement Negotiation Phase) A.1 and PJM Manual 14H, Section 5, if a Transition Cycle 1 New Service Request is withdrawn during Decision Point III and/or the Final Agreement Negotiation Phase, PJM shall remove the New Service Request from the Cycle and adjust the Security obligations of other New Service Requests based on the withdrawal. The Final System Impact Study results will reflect the updated Security amount for this project. Security may be in the form of cash, letter of credit, or other form of Security acceptable to PJM (see PJM M14H, Section 6.4).

Security is calculated for a New Service Request based on the Network Upgrade costs allocated pursuant to the Final System Impact Study results.

Note 1: "Network Upgrades" referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Security Due for AE2-291

Security has been calculated for the AE2-291 project(s) based on the Final System Impact Study results and is shown in the table below. This Security must be provided at Final SIS through either a wire transfer or letter of credit or other form of Security deemed acceptable by PJM per Manual 14H, Section 6.4.

Security Due for AE2-291
Project(s): AE2-291
Final Agreement Security (A): $20,019,597
Portion of Costs Already Paid (B): $0
Revised Net Security (C): A B = $20,019,597
Security on Hand with PJM (D): $22,045,979
Additional Security Due at Agreement Execution (E): C D = $0
Note:

In accordance with Tariff, Part VII, Subpart D, section 314(B)(4)(a) (Final Agreement Negotiation Phase) failure to provide any required adjustments to Security within the 15 Business Day period will result in the New Service Request project being terminated and withdrawn.

Please see the cover letter for more details on Letter of Credit/Wire details to satisfy the additional Security requirement.

If no additional Security is required, please coordinate with your assigned Project Manager to initiate any refunds of Security reductions.

Transmission Owner Scope of Work

The New Service Request Project will interconnect with the Dominion transmission system via a new three breaker ring bus switching station that connects on the Grit DP-Perth 115 kV Line 31. The required work for the interconnection of the New Service Request Project to the Dominion Transmission System is detailed in the following tables.

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Scope
Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
n9355.0

Remote Relay at Substation Altavista.

$119,401$28,809$22,814$5,080$176,104$176,104
n9354.0

Remote Relay at Substation Otter River.

$108,073$0$20,779$0$128,852$128,852
n9353.0

Remote Relay at Substation Perth.

$116,541$36,142$22,301$6,374$181,358$181,358
n9352.0

Re-arrange line #31 to loop into and out of the new three-breaker AE2-291 115 kV switching station.

$2,097,077$1,168,936$201,843$150,555$3,618,411$3,618,411
Stand-Alone Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
n9351.0

Build a new 115 kV three-breaker ring switching station located along VEPCO’s existing 115 kV, 31 line from Altavista Substation to Perth Substation.

$5,971,905$3,558,162$1,570,561$467,339$11,567,967$11,567,967
Transmission Owner Interconnection Facilities
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Install a 115 kV backbone structure with a line switch and foundation within the fence of the Interconnection Substation, to terminate the Project Developer’s generator lead line. Line conductor from the backbone structure to the bus position in the switchyard of the interconnection substation.

$636,537$257,162$165,330$32,083$1,091,112$1,091,112

Based on the scope of work for the Interconnection Facilities, it is expected to take 39 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase II of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

It is estimated to take 39 months to complete this work upon execution of the Generator Interconnection Agreement (GIA).This estimated time to complete is dependent on major equipment lead times. These preliminary cost estimates are based on typical engineering costs. A more detailed engineering cost estimates are normally done when the Project Developer provides an exact site plan location for the generation substation during a future study phase. As shown in the oneline diagram, this Interconnection Request is sharing the Point of Interconnection and Interconnection Facilities with one or more other Interconnection Requests. Should other requests withdraw from Transition Cycle 1, the cost allocation for Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and applicable Network Upgrades identified in the study report will be updated for the remaining project(s).   Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.
 
Remote Terminal Work: During Phase 2 of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Transmission Owner Analysis

PJM performed a power flow analysis of the transmission system using a 2027 load flow model and the results were verified by Dominion.

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. Dominion interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AE2-291 was evaluated as a 102.0 MW (61.2 MW Capacity) injection in the Dominion area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
SingleAC126.48 %245.0B309.8912.58
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Base Case
SingleAC123.38 %167.0A206.0512.87
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
AEP_P1-2_#311_5_SRT-A
SingleAC107.23 %245.0B262.7212.68
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
SingleAC127.99 %245.0B313.5812.58
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Base Case
SingleAC125.51 %167.0A209.5912.87
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
AEP_P1-2_#311_5_SRT-A
SingleAC108.71 %245.0B266.3512.68
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
SingleAC128.95 %245.0B315.9412.58
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Base Case
SingleAC126.83 %167.0A211.812.87
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
AEP_P1-2_#311_5_SRT-A
SingleAC109.65 %245.0B268.6412.68
GD1DVP
6BUCKING-6BREMO 230.0 kV Ckt 1 line
DVP_P4-2: 511T556_SRT-S-1
BreakerAC116.16 %699.0C811.9713.58
GD1DVP
6BUCKING-6BREMO 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
SingleAC113.03 %571.52B645.998.13
GD1DVP
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
DVP_P4-2: 511T556_SRT-S-1
BreakerAC117.22 %684.0C801.7913.59
GD1DVP
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
SingleAC114.05 %559.3B637.868.13

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:126.48 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:309.89
MW Contribution:12.58
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
80/20
1.7261.726
3151561HALLBR1
80/20
2.6232.623
942671AE2-283 C
80/20
9.5269.526
942751AE2-291 C
80/20
12.5812.58
3152661PLYWOOD A
80/20
0.4050.405
316118AC1-105 C
80/20
0.3030.303
940081AE1-250 C
80/20
5.2055.205
941801AE2-185 C
80/20
12.24712.247
24684305SMG1
80/20
1.0391.039
24684405SMG2
80/20
2.8622.862
24684505SMG3
80/20
1.7591.759
24684605SMG4
80/20
2.8622.862
24684705SMG5
80/20
1.0871.087
316003AC1-222 C
80/20
0.5490.549
316248AF1-058 C
80/20
0.1210.121
316217AC1-145 C
80/20
1.0561.056
270197AC1-083 C
80/20
0.5590.559
316197AC1-042 C
80/20
0.8870.887
316123AC1-075 C
80/20
1.1051.105
316205AC1-080 C
80/20
0.3690.369
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
NYPJM->LTFIMP_NY
CLTF
0.20.2
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:123.38 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:206.05
MW Contribution:12.87
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
80/20
1.761.76
3151561HALLBR1
80/20
2.682.68
942671AE2-283 C
80/20
9.7139.713
942751AE2-291 C
80/20
12.8712.87
3152661PLYWOOD A
80/20
0.420.42
316118AC1-105 C
80/20
0.3140.314
940081AE1-250 C
80/20
5.1945.194
941801AE2-185 C
80/20
12.48912.489
24684305SMG1
80/20
1.061.06
24684405SMG2
80/20
2.9182.918
24684505SMG3
80/20
1.7941.794
24684605SMG4
80/20
2.9182.918
24684705SMG5
80/20
1.1091.109
316003AC1-222 C
80/20
0.5650.565
316248AF1-058 C
80/20
0.1250.125
316217AC1-145 C
80/20
1.0771.077
270197AC1-083 C
80/20
0.5650.565
316197AC1-042 C
80/20
0.9050.905
316123AC1-075 C
80/20
1.1311.131
316205AC1-080 C
80/20
0.3780.378
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
NYPJM->LTFIMP_NY
CLTF
0.090.09
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
MDUPJM->LTFIMP_MDU
CLTF
00

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o AEP_P1-2_#311_5_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#311_5_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.23 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:262.72
MW Contribution:12.68
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
80/20
1.7271.727
3151561HALLBR1
80/20
2.6442.644
942671AE2-283 C
80/20
9.5919.591
942751AE2-291 C
80/20
12.67912.679
3152661PLYWOOD A
80/20
0.4090.409
316118AC1-105 C
80/20
0.3060.306
940081AE1-250 C
80/20
5.0765.076
941801AE2-185 C
80/20
12.33112.331
24684305SMG1
80/20
1.0191.019
24684405SMG2
80/20
2.8062.806
24684505SMG3
80/20
1.7241.724
24684605SMG4
80/20
2.8062.806
24684705SMG5
80/20
1.0661.066
316003AC1-222 C
80/20
0.5530.553
316248AF1-058 C
80/20
0.1220.122
316217AC1-145 C
80/20
1.0631.063
270197AC1-083 C
80/20
0.5470.547
316197AC1-042 C
80/20
0.8930.893
316123AC1-075 C
80/20
1.1131.113
316205AC1-080 C
80/20
0.3720.372
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5820.582
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.9832.983
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2962.296
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.29210.292
NYPJM->LTFIMP_NY
CLTF
0.1550.155
LGEELTFEXP_LGEE->PJM
CLTF
0.1220.122
WECLTFEXP_WEC->PJM
CLTF
0.0630.063
CPLELTFEXP_CPLE->PJM
CLTF
1.2211.221
TVALTFEXP_TVA->PJM
CLTF
0.6380.638
MECLTFEXP_MEC->PJM
CLTF
0.3910.391
LAGNLTFEXP_LAGN->PJM
CLTF
0.8020.802
SIGELTFEXP_SIGE->PJM
CLTF
0.0240.024

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:127.99 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:313.58
MW Contribution:12.58
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
80/20
1.7261.726
3151561HALLBR1
80/20
2.6232.623
942671AE2-283 C
80/20
9.5269.526
942751AE2-291 C
80/20
12.5812.58
3152661PLYWOOD A
80/20
0.4050.405
316118AC1-105 C
80/20
0.3030.303
940081AE1-250 C
80/20
5.2055.205
941801AE2-185 C
80/20
12.24712.247
24684305SMG1
80/20
1.0391.039
24684405SMG2
80/20
2.8622.862
24684505SMG3
80/20
1.7591.759
24684605SMG4
80/20
2.8622.862
24684705SMG5
80/20
1.0871.087
316003AC1-222 C
80/20
0.5490.549
316248AF1-058 C
80/20
0.1210.121
316217AC1-145 C
80/20
1.0561.056
270197AC1-083 C
80/20
0.5590.559
316197AC1-042 C
80/20
0.8870.887
316123AC1-075 C
80/20
1.1051.105
316205AC1-080 C
80/20
0.3690.369
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
NYPJM->LTFIMP_NY
CLTF
0.20.2
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:125.51 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:209.59
MW Contribution:12.87
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
80/20
1.761.76
3151561HALLBR1
80/20
2.682.68
942671AE2-283 C
80/20
9.7139.713
942751AE2-291 C
80/20
12.8712.87
3152661PLYWOOD A
80/20
0.420.42
316118AC1-105 C
80/20
0.3140.314
940081AE1-250 C
80/20
5.1945.194
941801AE2-185 C
80/20
12.48912.489
24684305SMG1
80/20
1.061.06
24684405SMG2
80/20
2.9182.918
24684505SMG3
80/20
1.7941.794
24684605SMG4
80/20
2.9182.918
24684705SMG5
80/20
1.1091.109
316003AC1-222 C
80/20
0.5650.565
316248AF1-058 C
80/20
0.1250.125
316217AC1-145 C
80/20
1.0771.077
270197AC1-083 C
80/20
0.5650.565
316197AC1-042 C
80/20
0.9050.905
316123AC1-075 C
80/20
1.1311.131
316205AC1-080 C
80/20
0.3780.378
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
NYPJM->LTFIMP_NY
CLTF
0.090.09
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
MDUPJM->LTFIMP_MDU
CLTF
00

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o AEP_P1-2_#311_5_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#311_5_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:108.71 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:266.35
MW Contribution:12.68
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
80/20
1.7271.727
3151561HALLBR1
80/20
2.6442.644
942671AE2-283 C
80/20
9.5919.591
942751AE2-291 C
80/20
12.67912.679
3152661PLYWOOD A
80/20
0.4090.409
316118AC1-105 C
80/20
0.3060.306
940081AE1-250 C
80/20
5.0765.076
941801AE2-185 C
80/20
12.33112.331
24684305SMG1
80/20
1.0191.019
24684405SMG2
80/20
2.8062.806
24684505SMG3
80/20
1.7241.724
24684605SMG4
80/20
2.8062.806
24684705SMG5
80/20
1.0661.066
316003AC1-222 C
80/20
0.5530.553
316248AF1-058 C
80/20
0.1220.122
316217AC1-145 C
80/20
1.0631.063
270197AC1-083 C
80/20
0.5470.547
316197AC1-042 C
80/20
0.8930.893
316123AC1-075 C
80/20
1.1131.113
316205AC1-080 C
80/20
0.3720.372
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5820.582
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.9832.983
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2962.296
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.29210.292
NYPJM->LTFIMP_NY
CLTF
0.1550.155
LGEELTFEXP_LGEE->PJM
CLTF
0.1220.122
WECLTFEXP_WEC->PJM
CLTF
0.0630.063
CPLELTFEXP_CPLE->PJM
CLTF
1.2211.221
TVALTFEXP_TVA->PJM
CLTF
0.6380.638
MECLTFEXP_MEC->PJM
CLTF
0.3910.391
LAGNLTFEXP_LAGN->PJM
CLTF
0.8020.802
SIGELTFEXP_SIGE->PJM
CLTF
0.0240.024

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:128.95 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:315.94
MW Contribution:12.58
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
80/20
1.7261.726
3151561HALLBR1
80/20
2.6232.623
942671AE2-283 C
80/20
9.5269.526
942751AE2-291 C
80/20
12.5812.58
3152661PLYWOOD A
80/20
0.4050.405
316118AC1-105 C
80/20
0.3030.303
940081AE1-250 C
80/20
5.2055.205
941801AE2-185 C
80/20
12.24712.247
24684305SMG1
80/20
1.0391.039
24684405SMG2
80/20
2.8622.862
24684505SMG3
80/20
1.7591.759
24684605SMG4
80/20
2.8622.862
24684705SMG5
80/20
1.0871.087
316003AC1-222 C
80/20
0.5490.549
316248AF1-058 C
80/20
0.1210.121
316217AC1-145 C
80/20
1.0561.056
270197AC1-083 C
80/20
0.5590.559
316197AC1-042 C
80/20
0.8870.887
316123AC1-075 C
80/20
1.1051.105
316205AC1-080 C
80/20
0.3690.369
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
NYPJM->LTFIMP_NY
CLTF
0.20.2
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:126.83 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:211.8
MW Contribution:12.87
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
80/20
1.761.76
3151561HALLBR1
80/20
2.682.68
942671AE2-283 C
80/20
9.7139.713
942751AE2-291 C
80/20
12.8712.87
3152661PLYWOOD A
80/20
0.420.42
316118AC1-105 C
80/20
0.3140.314
940081AE1-250 C
80/20
5.1945.194
941801AE2-185 C
80/20
12.48912.489
24684305SMG1
80/20
1.061.06
24684405SMG2
80/20
2.9182.918
24684505SMG3
80/20
1.7941.794
24684605SMG4
80/20
2.9182.918
24684705SMG5
80/20
1.1091.109
316003AC1-222 C
80/20
0.5650.565
316248AF1-058 C
80/20
0.1250.125
316217AC1-145 C
80/20
1.0771.077
270197AC1-083 C
80/20
0.5650.565
316197AC1-042 C
80/20
0.9050.905
316123AC1-075 C
80/20
1.1311.131
316205AC1-080 C
80/20
0.3780.378
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
NYPJM->LTFIMP_NY
CLTF
0.090.09
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
MDUPJM->LTFIMP_MDU
CLTF
00

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o AEP_P1-2_#311_5_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#311_5_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:109.65 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:268.64
MW Contribution:12.68
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
80/20
1.7271.727
3151561HALLBR1
80/20
2.6442.644
942671AE2-283 C
80/20
9.5919.591
942751AE2-291 C
80/20
12.67912.679
3152661PLYWOOD A
80/20
0.4090.409
316118AC1-105 C
80/20
0.3060.306
940081AE1-250 C
80/20
5.0765.076
941801AE2-185 C
80/20
12.33112.331
24684305SMG1
80/20
1.0191.019
24684405SMG2
80/20
2.8062.806
24684505SMG3
80/20
1.7241.724
24684605SMG4
80/20
2.8062.806
24684705SMG5
80/20
1.0661.066
316003AC1-222 C
80/20
0.5530.553
316248AF1-058 C
80/20
0.1220.122
316217AC1-145 C
80/20
1.0631.063
270197AC1-083 C
80/20
0.5470.547
316197AC1-042 C
80/20
0.8930.893
316123AC1-075 C
80/20
1.1131.113
316205AC1-080 C
80/20
0.3720.372
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5820.582
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.9832.983
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2962.296
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.29210.292
NYPJM->LTFIMP_NY
CLTF
0.1550.155
LGEELTFEXP_LGEE->PJM
CLTF
0.1220.122
WECLTFEXP_WEC->PJM
CLTF
0.0630.063
CPLELTFEXP_CPLE->PJM
CLTF
1.2211.221
TVALTFEXP_TVA->PJM
CLTF
0.6380.638
MECLTFEXP_MEC->PJM
CLTF
0.3910.391
LAGNLTFEXP_LAGN->PJM
CLTF
0.8020.802
SIGELTFEXP_SIGE->PJM
CLTF
0.0240.024

Details for 6BUCKING-6BREMO 230.0 kV Ckt 1 line l/o DVP_P4-2: 511T556_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6BUCKING-6BREMO 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 511T556_SRT-S-1
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:116.16 %
Rating:699.0 MVA
Rating Type:C
MVA to Mitigate:811.97
MW Contribution:13.58
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6BUCKING-6BREMO 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 511T556_SRT-S-1
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:120.96 %
Rating:699.0 MVA
Rating Type:C
MVA to Mitigate:845.48
MW Contribution:13.85
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
50/50
4.6774.677
961792AG1-021 E
50/50
3.9843.984
964791AG1-342 C
Adder
5.5435294117647054.712
964792AG1-342 E
Adder
3.6952941176470593.141
3138533PONTONDP
50/50
1.7321.732
3144293JTRSVLE
50/50
1.0761.076
3147133PAMPLIN
50/50
2.7572.757
3151531CLOVER1
50/50
22.522.5
925785AC1-054 E
Adder
3.35529411764705852.852
926274AC1-105 E
Adder
4.0129411764705883.411
942751AE2-291 C
Adder
8.1482352941176476.926
942752AE2-291 E
Adder
5.4329411764705894.618
943902AF1-058 E
Adder
1.841.564
959311AF2-222 C
50/50
38.90838.908
959312AF2-222 E
50/50
26.06826.068
924162AB2-060 E OP
Adder
7.6670588235294136.517
924302AB2-077 E O1
Adder
2.3152941176470591.968
924312AB2-078 E O1
Adder
2.3152941176470591.968
924322AB2-079 E O1
Adder
2.3152941176470591.968
925612AC1-036 E
50/50
1.961.96
941011AE2-092 C
Adder
-9.729411764705882-8.27
946301AF1-294 C
50/50
9.6139.613
946302AF1-294 E
50/50
8.1418.141
957481AF2-042 C
50/50
98.10798.107
957482AF2-042 E
50/50
65.40565.405
958211AF2-115 C
50/50
5.8465.846
958212AF2-115 E
50/50
4.984.98
924032AB2-045 E
50/50
5.85.8
3147223TWITTYS
50/50
2.1732.173
936261AD2-033 C
50/50
27.66927.669
936262AD2-033 E
50/50
18.44618.446
934621AD1-088 C
50/50
18.90418.904
934622AD1-088 E
50/50
9.1029.102
316034AC1-036 C
50/50
0.5350.535
316322AB2-045 C
50/50
1.2941.294
316336AC2-165 C
Adder
-5.905882352941176-5.02
927255AC1-221 E
Adder
4.1458823529411773.524
927264AC1-222 E
Adder
5.52000000000000054.692
932763AC2-100 E
Adder
2.72941176470588242.32
924022AB2-043 E O1
Adder
9.122352941176477.754
925997AC1-075 E
Adder
3.31294117647058832.816
926024AC1-080 E
Adder
1.09882352941176480.934
962561AG1-105 C
Adder
14.18117647058823612.054
962562AG1-105 E
Adder
9.4541176470588238.036
964241AG1-285 C
50/50
25.15525.155
964242AG1-285 E
50/50
16.7716.77
934612AD1-087 E
Adder
6.3835294117647065.426
935172AD1-152 E
Adder
8.887.548
937482AD2-202 E
Adder
1.86823529411764721.588
938821AE1-108 C
Adder
-10.607058823529412-9.016
942461AE2-259 C
50/50
31.1431.14
942462AE2-259 E
50/50
20.7620.76
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.1652.165
CBM West 1LTFEXP_CBM-W1->PJM
CBM
9.3429.342
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.2887.288
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
36.04736.047
G-007PJM->LTFIMP_G-007
CMTX_NF
0.8050.805
NYPJM->LTFIMP_NY
CLTF
0.3840.384
LGEELTFEXP_LGEE->PJM
CLTF
0.3670.367
WECLTFEXP_WEC->PJM
CLTF
0.1940.194
CPLELTFEXP_CPLE->PJM
CLTF
4.5424.542
TVALTFEXP_TVA->PJM
CLTF
2.0142.014
MECLTFEXP_MEC->PJM
CLTF
1.2261.226
LAGNLTFEXP_LAGN->PJM
CLTF
2.5782.578
SIGELTFEXP_SIGE->PJM
CLTF
0.0740.074
O66PJM->LTFIMP_O-066
CMTX_NF
5.1335.133

Details for 6BUCKING-6BREMO 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6BUCKING-6BREMO 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:113.03 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:645.99
MW Contribution:8.13
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6BUCKING-6BREMO 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:119.98 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:685.72
MW Contribution:8.28
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
80/20
4.6754.675
964791AG1-342 C
80/20
5.5355.535
966621AG1-532 C
80/20
0.7060.706
313506AB1-173 C OP
80/20
0.5620.562
3138533PONTONDP
80/20
1.7311.731
3144293JTRSVLE
80/20
1.0761.076
3147043LAWRENC
80/20
0.2660.266
3151261ROARAP2
80/20
0.6810.681
3151281ROARAP4
80/20
0.6440.644
3151311EDGECMA
80/20
5.0375.037
3151361ROSEMG1
80/20
0.6210.621
3151371ROSEMS1
80/20
0.3840.384
3151381ROSEMG2
80/20
0.2910.291
3151391GASTONA
80/20
0.9230.923
3151531CLOVER1
80/20
22.47222.472
3151541CLOVER2
80/20
22.26222.262
3151561HALLBR1
80/20
0.5580.558
3151581KERR 1
80/20
0.5570.557
3151591KERR 2
80/20
1.5611.561
3151601KERR 3
80/20
1.5611.561
3151611KERR 4
80/20
1.5611.561
3151621KERR 5
80/20
1.5611.561
942671AE2-283 C
80/20
1.5211.521
942751AE2-291 C
80/20
8.1298.129
959311AF2-222 C
80/20
38.88338.883
960081AF2-299 C
80/20
0.9410.941
3151631KERR 6
80/20
1.5611.561
3151641KERR 7
80/20
1.5611.561
3152661PLYWOOD A
80/20
1.751.75
3156063AA2-053SOLA
80/20
0.6790.679
316118AC1-105 C
80/20
1.3691.369
316129AC1-054 C
80/20
1.1891.189
316131AB2-060 C
80/20
2.662.66
941011AE2-092 C
Adder
-9.714117647058824-8.257
941801AE2-185 C
80/20
1.9561.956
946281AF1-292 C
80/20
0.7790.779
946301AF1-294 C
80/20
9.6099.609
957481AF2-042 C
80/20
97.99997.999
958211AF2-115 C
80/20
5.8435.843
3151411GASTONB
80/20
0.9230.923
3156073AA1-063SOLA
80/20
0.5840.584
926071AC1-086 C
80/20
6.3516.351
936261AD2-033 C
80/20
27.64927.649
934621AD1-088 C
80/20
18.88618.886
962571AG1-106 C
80/20
0.8210.821
316003AC1-222 C
80/20
1.3481.348
316011AB1-132 C OP
80/20
0.7050.705
316034AC1-036 C
80/20
0.5340.534
316049AB1-081 C OP
80/20
0.4770.477
316210AC1-098 C
80/20
0.3390.339
316212AC1-099 C
80/20
0.1130.113
316222AC1-221 C
80/20
1.5791.579
316237AB2-079 C O1
80/20
0.5670.567
316238AB2-078 C O1
80/20
0.5670.567
316239AB2-077 C O1
80/20
0.5670.567
316248AF1-058 C
80/20
0.450.45
316263AC1-034 C
80/20
2.2292.229
316274AC1-208 C
80/20
3.5413.541
316283AC2-100 C
80/20
1.2351.235
316319Z2-044 C
80/20
0.0740.074
316322AB2-045 C
80/20
1.2941.294
316336AC2-165 C
Adder
-5.884705882352941-5.002
316217AC1-145 C
80/20
0.1690.169
316327AA2-057 C
80/20
0.4730.473
316181AB2-040 GEN
80/20
0.6330.633
313527AB2-043 C
80/20
0.9080.908
316359AB2-059 C OP
80/20
0.5620.562
316087AB2-174 C
80/20
0.5880.588
316197AC1-042 C
80/20
0.1420.142
316123AC1-075 C
80/20
0.9530.953
316205AC1-080 C
80/20
0.3190.319
962561AG1-105 C
80/20
14.16114.161
964241AG1-285 C
80/20
25.13225.132
3137643SOCKMAN
80/20
0.3520.352
932631AC2-084 C
80/20
0.3610.361
934321AD1-056 C
80/20
1.9781.978
934331AD1-057 C
80/20
1.1031.103
934611AD1-087 C
80/20
2.212.21
935171AD1-152 C
80/20
2.1552.155
936161AD2-022 C
80/20
3.6193.619
936171AD2-023 C
80/20
2.1112.111
937481AD2-202 C
80/20
0.6410.641
938821AE1-108 C
Adder
-10.596470588235293-9.007
942461AE2-259 C
80/20
31.13331.133
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.1162.116
CBM West 1LTFEXP_CBM-W1->PJM
CBM
9.0479.047
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.0847.084
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
35.17235.172
NYPJM->LTFIMP_NY
CLTF
0.3750.375
LGEELTFEXP_LGEE->PJM
CLTF
0.3550.355
WECLTFEXP_WEC->PJM
CLTF
0.1880.188
CPLELTFEXP_CPLE->PJM
CLTF
4.444.44
TVALTFEXP_TVA->PJM
CLTF
1.9591.959
MECLTFEXP_MEC->PJM
CLTF
1.1891.189
LAGNLTFEXP_LAGN->PJM
CLTF
2.5082.508
SIGELTFEXP_SIGE->PJM
CLTF
0.0720.072

Details for 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line l/o DVP_P4-2: 511T556_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 511T556_SRT-S-1
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:117.22 %
Rating:684.0 MVA
Rating Type:C
MVA to Mitigate:801.79
MW Contribution:13.59
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 511T556_SRT-S-1
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:121.59 %
Rating:684.0 MVA
Rating Type:C
MVA to Mitigate:831.68
MW Contribution:13.85
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
50/50
4.6774.677
961792AG1-021 E
50/50
3.9843.984
964791AG1-342 C
Adder
5.5447058823529414.713
964792AG1-342 E
Adder
3.6964705882352943.142
966621AG1-532 C
Adder
0.70470588235294120.599
966622AG1-532 E
Adder
0.47058823529411770.4
3138533PONTONDP
50/50
1.7321.732
3144293JTRSVLE
50/50
1.0761.076
3145723EMPORIA
Adder
0.21647058823529410.184
3147133PAMPLIN
50/50
2.7572.757
3151531CLOVER1
50/50
22.50522.505
925785AC1-054 E
Adder
3.35647058823529452.853
926274AC1-105 E
Adder
4.0141176470588233.412
942751AE2-291 C
Adder
8.1517647058823536.929
942752AE2-291 E
Adder
5.4352941176470594.62
943902AF1-058 E
Adder
1.841.564
959311AF2-222 C
50/50
38.91438.914
959312AF2-222 E
50/50
26.07226.072
960081AF2-299 C
Adder
0.94000000000000010.799
960082AF2-299 E
Adder
0.62705882352941180.533
924162AB2-060 E OP
Adder
7.6694117647058836.519
924302AB2-077 E O1
Adder
2.3164705882352941.969
924312AB2-078 E O1
Adder
2.3164705882352941.969
924322AB2-079 E O1
Adder
2.3164705882352941.969
925612AC1-036 E
50/50
1.961.96
941011AE2-092 C
Adder
-9.724705882352941-8.266
946281AF1-292 C
Adder
0.77764705882352950.661
946282AF1-292 E
Adder
0.51882352941176470.441
946301AF1-294 C
50/50
9.6159.615
946302AF1-294 E
50/50
8.1428.142
957481AF2-042 C
50/50
98.12598.125
957482AF2-042 E
50/50
65.41765.417
958211AF2-115 C
50/50
5.8475.847
958212AF2-115 E
50/50
4.9814.981
3147223TWITTYS
50/50
2.1732.173
936261AD2-033 C
50/50
27.67327.673
936262AD2-033 E
50/50
18.44918.449
934621AD1-088 C
50/50
18.90718.907
934622AD1-088 E
50/50
9.1039.103
316034AC1-036 C
50/50
0.5350.535
316336AC2-165 C
Adder
-5.9023529411764715-5.017
927255AC1-221 E
Adder
4.1470588235294123.525
927264AC1-222 E
Adder
5.5211764705882354.693
932763AC2-100 E
Adder
2.7305882352941182.321
924022AB2-043 E O1
Adder
9.1247058823529417.756
925997AC1-075 E
Adder
3.3141176470588242.817
926024AC1-080 E
Adder
1.10.935
962561AG1-105 C
Adder
14.18352941176470612.056
962562AG1-105 E
Adder
9.4564705882352958.038
964241AG1-285 C
50/50
25.15925.159
964242AG1-285 E
50/50
16.77316.773
934612AD1-087 E
Adder
6.3847058823529415.427
935172AD1-152 E
Adder
8.8823529411764717.55
937482AD2-202 E
Adder
1.86823529411764721.588
938821AE1-108 C
Adder
-10.602352941176472-9.012
942461AE2-259 C
50/50
31.14431.144
942462AE2-259 E
50/50
20.76320.763
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.1672.167
CBM West 1LTFEXP_CBM-W1->PJM
CBM
9.4439.443
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.3277.327
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
36.10836.108
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7990.799
NYPJM->LTFIMP_NY
CLTF
0.3810.381
LGEELTFEXP_LGEE->PJM
CLTF
0.370.37
WECLTFEXP_WEC->PJM
CLTF
0.1960.196
CPLELTFEXP_CPLE->PJM
CLTF
4.5484.548
TVALTFEXP_TVA->PJM
CLTF
2.0222.022
MECLTFEXP_MEC->PJM
CLTF
1.2351.235
LAGNLTFEXP_LAGN->PJM
CLTF
2.5882.588
SIGELTFEXP_SIGE->PJM
CLTF
0.0750.075
O66PJM->LTFIMP_O-066
CMTX_NF
5.0935.093

Details for 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:114.05 %
Rating:559.3 MVA
Rating Type:B
MVA to Mitigate:637.86
MW Contribution:8.13
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:121.13 %
Rating:559.3 MVA
Rating Type:B
MVA to Mitigate:677.49
MW Contribution:8.29
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
80/20
4.6754.675
964791AG1-342 C
80/20
5.5375.537
966621AG1-532 C
80/20
0.7060.706
313506AB1-173 C OP
80/20
0.5620.562
3138533PONTONDP
80/20
1.7321.732
3144293JTRSVLE
80/20
1.0761.076
3147043LAWRENC
80/20
0.2660.266
3151261ROARAP2
80/20
0.6820.682
3151281ROARAP4
80/20
0.6450.645
3151311EDGECMA
80/20
5.0435.043
3151361ROSEMG1
80/20
0.6210.621
3151371ROSEMS1
80/20
0.3850.385
3151381ROSEMG2
80/20
0.2910.291
3151391GASTONA
80/20
0.9240.924
3151531CLOVER1
80/20
22.47722.477
3151541CLOVER2
80/20
22.26722.267
3151561HALLBR1
80/20
0.5580.558
3151581KERR 1
80/20
0.5580.558
3151591KERR 2
80/20
1.5621.562
3151601KERR 3
80/20
1.5621.562
3151611KERR 4
80/20
1.5621.562
3151621KERR 5
80/20
1.5621.562
942671AE2-283 C
80/20
1.5231.523
942751AE2-291 C
80/20
8.1328.132
959311AF2-222 C
80/20
38.88938.889
960081AF2-299 C
80/20
0.9420.942
3151631KERR 6
80/20
1.5621.562
3151641KERR 7
80/20
1.5621.562
3152661PLYWOOD A
80/20
1.751.75
3156063AA2-053SOLA
80/20
0.680.68
316118AC1-105 C
80/20
1.3691.369
316129AC1-054 C
80/20
1.1891.189
316131AB2-060 C
80/20
2.6612.661
941011AE2-092 C
Adder
-9.709411764705882-8.253
941801AE2-185 C
80/20
1.9581.958
946281AF1-292 C
80/20
0.7790.779
946301AF1-294 C
80/20
9.619.61
957481AF2-042 C
80/20
98.01698.016
958211AF2-115 C
80/20
5.8445.844
3151411GASTONB
80/20
0.9240.924
3156073AA1-063SOLA
80/20
0.5850.585
926071AC1-086 C
80/20
6.3586.358
936261AD2-033 C
80/20
27.65427.654
934621AD1-088 C
80/20
18.88918.889
962571AG1-106 C
80/20
0.8220.822
316003AC1-222 C
80/20
1.3491.349
316011AB1-132 C OP
80/20
0.7060.706
316034AC1-036 C
80/20
0.5340.534
316049AB1-081 C OP
80/20
0.4780.478
316210AC1-098 C
80/20
0.3390.339
316212AC1-099 C
80/20
0.1140.114
316222AC1-221 C
80/20
1.581.58
316237AB2-079 C O1
80/20
0.5670.567
316238AB2-078 C O1
80/20
0.5670.567
316239AB2-077 C O1
80/20
0.5670.567
316248AF1-058 C
80/20
0.450.45
316263AC1-034 C
80/20
2.2322.232
316274AC1-208 C
80/20
3.5443.544
316283AC2-100 C
80/20
1.2351.235
316319Z2-044 C
80/20
0.0740.074
316336AC2-165 C
Adder
-5.881176470588235-4.999
316217AC1-145 C
80/20
0.1690.169
316327AA2-057 C
80/20
0.4730.473
316181AB2-040 GEN
80/20
0.6330.633
313527AB2-043 C
80/20
0.9080.908
316359AB2-059 C OP
80/20
0.5630.563
316087AB2-174 C
80/20
0.5890.589
316197AC1-042 C
80/20
0.1420.142
316123AC1-075 C
80/20
0.9540.954
316205AC1-080 C
80/20
0.3190.319
962561AG1-105 C
80/20
14.16414.164
964241AG1-285 C
80/20
25.13725.137
3137643SOCKMAN
80/20
0.3530.353
932631AC2-084 C
80/20
0.3610.361
934321AD1-056 C
80/20
1.981.98
934331AD1-057 C
80/20
1.1051.105
934611AD1-087 C
80/20
2.212.21
935171AD1-152 C
80/20
2.1562.156
936161AD2-022 C
80/20
3.6223.622
936171AD2-023 C
80/20
2.1132.113
937481AD2-202 C
80/20
0.6410.641
938821AE1-108 C
Adder
-10.591764705882353-9.003
942461AE2-259 C
80/20
31.13731.137
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.1192.119
CBM West 1LTFEXP_CBM-W1->PJM
CBM
9.1489.148
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.1237.123
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
35.23335.233
NYPJM->LTFIMP_NY
CLTF
0.3720.372
LGEELTFEXP_LGEE->PJM
CLTF
0.3590.359
WECLTFEXP_WEC->PJM
CLTF
0.190.19
CPLELTFEXP_CPLE->PJM
CLTF
4.4464.446
TVALTFEXP_TVA->PJM
CLTF
1.9681.968
MECLTFEXP_MEC->PJM
CLTF
1.1991.199
LAGNLTFEXP_LAGN->PJM
CLTF
2.5182.518
SIGELTFEXP_SIGE->PJM
CLTF
0.0720.072
CONTINGENCY 'AEP_P1-2_#3174_6_SRT-A'
 OPEN BRANCH FROM BUS 242512 TO BUS 242515 CKT 1   /*05CLOVRD     765.0 - 05JOSHUA     765.0
END
CONTINGENCY 'AEP_P1-2_#311_5_SRT-A'
 OPEN BRANCH FROM BUS 242512 TO BUS 242514 CKT 1   /*05CLOVRD     765.0 - 05J.FERR     765.0
END
CONTINGENCY 'DVP_P4-2: 511T556_SRT-S-1'
 OPEN BRANCH FROM BUS 313995 TO BUS 314936 CKT 1                /*8FINNEYWOOD  500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314936 CKT 1                /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
CONTINGENCY 'DVP_P1-2: LN 556_SRT-S-3'
 OPEN BRANCH FROM BUS 313995 TO BUS 314936 CKT 1                /*8FINNEYWOOD  500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
242687 to 242734 ckt 1
242741 to 242687 ckt 1
314667 to 242741 ckt 1
314677 to 314747 ckt 1
314692 to 314677 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1DVP
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 585_SRT-A-1
SingleAC106.7 %4070.2B4342.9713.51
GD1DVP
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 585_SRT-A-2
SingleAC102.59 %4070.2B4175.6213.51
GD1DVP
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 511_SRT-S
SingleAC104.04 %4070.2B4234.712.11

Details for 8RAWLINGS-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 585_SRT-A-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 585_SRT-A-1
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:106.7 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4342.97
MW Contribution:13.51
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
80/20
2.642.64
963041AG1-153 C
80/20
17.24617.246
964791AG1-342 C
80/20
6.5026.502
24728405LEESVG
80/20
0.9740.974
3138533PONTONDP
80/20
0.9780.978
3144293JTRSVLE
80/20
0.6050.605
3151311EDGECMA
80/20
10.35810.358
3151531CLOVER1
80/20
32.84832.848
3151541CLOVER2
80/20
32.5432.54
3151561HALLBR1
80/20
1.2391.239
3151581KERR 1
80/20
0.650.65
3151591KERR 2
80/20
1.8191.819
3151601KERR 3
80/20
1.8191.819
3151611KERR 4
80/20
1.8191.819
3151621KERR 5
80/20
1.8191.819
942671AE2-283 C
80/20
3.7323.732
942751AE2-291 C
80/20
13.51213.512
943811AF1-049 C
80/20
9.4269.426
944011AF1-069 C
80/20
38.91238.912
959311AF2-222 C
80/20
25.13225.132
3151631KERR 6
80/20
1.8191.819
3151641KERR 7
80/20
1.8191.819
3152661PLYWOOD A
80/20
2.3542.354
316118AC1-105 C
80/20
1.7691.769
316129AC1-054 C
80/20
1.1861.186
316131AB2-060 C
80/20
2.3152.315
940081AE1-250 C
80/20
13.65313.653
941031AE2-094 C
80/20
119.094119.094
941801AE2-185 C
80/20
4.7984.798
946301AF1-294 C
80/20
5.4265.426
957481AF2-042 C
80/20
148.174148.174
958211AF2-115 C
80/20
3.33.3
3151021BRUNSWICKG1
80/20
25.36825.368
3151031BRUNSWICKG2
80/20
25.36825.368
3151041BRUNSWICKG3
80/20
25.36825.368
3151051BRUNSWICKS1
80/20
52.70552.705
3152411Z1-086 GT1
80/20
32.08832.088
3152421Z1-086 GT2
80/20
32.07932.079
3152431Z1-086 GT3
80/20
32.07932.079
3152441Z1-086 ST
80/20
55.85455.854
957601AF2-054 C
Adder
-1.8941176470588237-1.61
964211AG1-282 C
Adder
-1.7882352941176471-1.52
942001AE2-212 C
Adder
-2.1176470588235294-1.8
936261AD2-033 C
80/20
19.83719.837
941671AE2-166 C
80/20
5.7085.708
933291AC2-141 C
Adder
-33.98823529411765-28.89
934621AD1-088 C
80/20
24.38424.384
24684305SMG1
80/20
1.1751.175
24684405SMG2
80/20
3.2353.235
24684505SMG3
80/20
1.9881.988
24684605SMG4
80/20
3.2353.235
24684705SMG5
80/20
1.2291.229
316003AC1-222 C
80/20
1.9581.958
316034AC1-036 C
80/20
0.3540.354
316049AB1-081 C OP
80/20
0.9630.963
316222AC1-221 C
80/20
2.9052.905
316237AB2-079 C O1
80/20
0.5160.516
316238AB2-078 C O1
80/20
0.5160.516
316239AB2-077 C O1
80/20
0.5160.516
316240AF1-291 C
Adder
-2.031764705882353-1.727
316248AF1-058 C
80/20
0.6420.642
316263AC1-034 C
80/20
4.5164.516
316283AC2-100 C
80/20
2.3262.326
316322AB2-045 C
80/20
0.2670.267
316217AC1-145 C
80/20
0.4120.412
270197AC1-083 C
80/20
0.9970.997
313527AB2-043 C
80/20
0.8060.806
316359AB2-059 C OP
80/20
1.1351.135
316197AC1-042 C
80/20
0.3460.346
316123AC1-075 C
80/20
1.5121.512
316205AC1-080 C
80/20
0.5050.505
962561AG1-105 C
80/20
15.92115.921
964241AG1-285 C
80/20
19.39519.395
934611AD1-087 C
80/20
3.2323.232
935171AD1-152 C
80/20
3.2243.224
936161AD2-022 C
80/20
12.80112.801
936171AD2-023 C
80/20
7.4677.467
937481AD2-202 C
80/20
0.9380.938
938531AE1-072 C
Adder
-16.896470588235296-14.362
940641AE2-051 C
Adder
-22.240000000000002-18.904
941431AE2-140 C
80/20
14.14314.143
942461AE2-259 C
80/20
14.02314.023
944641AF1-129 C
Adder
-95.19529411764705-80.916
938741AE1-100 C
80/20
0.7290.729
940601AE2-047 C
80/20
4.254.25
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.6199.619
CBM West 1LTFEXP_CBM-W1->PJM
CBM
74.77474.774
CBM West 2LTFEXP_CBM-W2->PJM
CBM
46.81246.812
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
177.277177.277
NYPJM->LTFIMP_NY
CLTF
2.1882.188
LGEELTFEXP_LGEE->PJM
CLTF
2.8852.885
WECLTFEXP_WEC->PJM
CLTF
1.5251.525
CPLELTFEXP_CPLE->PJM
CLTF
20.16220.162
TVALTFEXP_TVA->PJM
CLTF
12.22612.226
MECLTFEXP_MEC->PJM
CLTF
8.7578.757
LAGNLTFEXP_LAGN->PJM
CLTF
15.4915.49
SIGELTFEXP_SIGE->PJM
CLTF
0.550.55

Details for 8RAWLINGS-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 585_SRT-A-2


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 585_SRT-A-2
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:102.59 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4175.62
MW Contribution:13.51
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
80/20
2.642.64
963041AG1-153 C
80/20
17.24617.246
964791AG1-342 C
80/20
6.5026.502
24728405LEESVG
80/20
0.9740.974
3138533PONTONDP
80/20
0.9780.978
3144293JTRSVLE
80/20
0.6050.605
3151311EDGECMA
80/20
10.35810.358
3151531CLOVER1
80/20
32.84832.848
3151541CLOVER2
80/20
32.5432.54
3151561HALLBR1
80/20
1.2391.239
3151581KERR 1
80/20
0.650.65
3151591KERR 2
80/20
1.8191.819
3151601KERR 3
80/20
1.8191.819
3151611KERR 4
80/20
1.8191.819
3151621KERR 5
80/20
1.8191.819
942671AE2-283 C
80/20
3.7323.732
942751AE2-291 C
80/20
13.51213.512
943811AF1-049 C
80/20
9.4269.426
959311AF2-222 C
80/20
25.13225.132
3151631KERR 6
80/20
1.8191.819
3151641KERR 7
80/20
1.8191.819
3152661PLYWOOD A
80/20
2.3542.354
316118AC1-105 C
80/20
1.7691.769
316129AC1-054 C
80/20
1.1861.186
316131AB2-060 C
80/20
2.3152.315
940081AE1-250 C
80/20
13.65313.653
941801AE2-185 C
80/20
4.7984.798
946301AF1-294 C
80/20
5.4265.426
957481AF2-042 C
80/20
148.174148.174
958211AF2-115 C
80/20
3.33.3
3151021BRUNSWICKG1
80/20
25.36825.368
3151031BRUNSWICKG2
80/20
25.36825.368
3151041BRUNSWICKG3
80/20
25.36825.368
3151051BRUNSWICKS1
80/20
52.70552.705
3152411Z1-086 GT1
80/20
32.08832.088
3152421Z1-086 GT2
80/20
32.07932.079
3152431Z1-086 GT3
80/20
32.07932.079
3152441Z1-086 ST
80/20
55.85455.854
957601AF2-054 C
Adder
-1.8941176470588237-1.61
964211AG1-282 C
Adder
-1.7882352941176471-1.52
942001AE2-212 C
Adder
-2.1176470588235294-1.8
936261AD2-033 C
80/20
19.83719.837
941671AE2-166 C
80/20
5.7085.708
933291AC2-141 C
Adder
-33.98823529411765-28.89
934621AD1-088 C
80/20
24.38424.384
24684305SMG1
80/20
1.1751.175
24684405SMG2
80/20
3.2353.235
24684505SMG3
80/20
1.9881.988
24684605SMG4
80/20
3.2353.235
24684705SMG5
80/20
1.2291.229
316003AC1-222 C
80/20
1.9581.958
316034AC1-036 C
80/20
0.3540.354
316049AB1-081 C OP
80/20
0.9630.963
316222AC1-221 C
80/20
2.9052.905
316237AB2-079 C O1
80/20
0.5160.516
316238AB2-078 C O1
80/20
0.5160.516
316239AB2-077 C O1
80/20
0.5160.516
316240AF1-291 C
Adder
-2.031764705882353-1.727
316248AF1-058 C
80/20
0.6420.642
316263AC1-034 C
80/20
4.5164.516
316283AC2-100 C
80/20
2.3262.326
316322AB2-045 C
80/20
0.2670.267
316217AC1-145 C
80/20
0.4120.412
270197AC1-083 C
80/20
0.9970.997
313527AB2-043 C
80/20
0.8060.806
316359AB2-059 C OP
80/20
1.1351.135
316197AC1-042 C
80/20
0.3460.346
316123AC1-075 C
80/20
1.5121.512
316205AC1-080 C
80/20
0.5050.505
962561AG1-105 C
80/20
15.92115.921
964241AG1-285 C
80/20
19.39519.395
934611AD1-087 C
80/20
3.2323.232
935171AD1-152 C
80/20
3.2243.224
936161AD2-022 C
80/20
12.80112.801
936171AD2-023 C
80/20
7.4677.467
937481AD2-202 C
80/20
0.9380.938
938531AE1-072 C
Adder
-16.896470588235296-14.362
940641AE2-051 C
Adder
-22.240000000000002-18.904
941431AE2-140 C
80/20
14.14314.143
942461AE2-259 C
80/20
14.02314.023
944641AF1-129 C
Adder
-95.19529411764705-80.916
938741AE1-100 C
80/20
0.7290.729
940601AE2-047 C
80/20
4.254.25
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.6199.619
CBM West 1LTFEXP_CBM-W1->PJM
CBM
74.77474.774
CBM West 2LTFEXP_CBM-W2->PJM
CBM
46.81246.812
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
177.277177.277
NYPJM->LTFIMP_NY
CLTF
2.1882.188
LGEELTFEXP_LGEE->PJM
CLTF
2.8852.885
WECLTFEXP_WEC->PJM
CLTF
1.5251.525
CPLELTFEXP_CPLE->PJM
CLTF
20.16220.162
TVALTFEXP_TVA->PJM
CLTF
12.22612.226
MECLTFEXP_MEC->PJM
CLTF
8.7578.757
LAGNLTFEXP_LAGN->PJM
CLTF
15.4915.49
SIGELTFEXP_SIGE->PJM
CLTF
0.550.55

Details for AE2-094 TP-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 511_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 511_SRT-S
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:104.04 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4234.7
MW Contribution:12.11
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
80/20
2.3092.309
963041AG1-153 C
80/20
17.10317.103
964791AG1-342 C
80/20
5.7665.766
24728405LEESVG
80/20
0.8940.894
3138533PONTONDP
80/20
0.8550.855
3144293JTRSVLE
80/20
0.5290.529
3151531CLOVER1
80/20
28.86928.869
3151541CLOVER2
80/20
28.59828.598
3151561HALLBR1
80/20
1.1241.124
3151581KERR 1
80/20
0.5770.577
3151591KERR 2
80/20
1.6151.615
3151601KERR 3
80/20
1.6151.615
3151611KERR 4
80/20
1.6151.615
3151621KERR 5
80/20
1.6151.615
942671AE2-283 C
80/20
3.3963.396
942751AE2-291 C
80/20
12.11212.112
943811AF1-049 C
80/20
8.9298.929
944011AF1-069 C
80/20
45.1645.16
959311AF2-222 C
80/20
22.05622.056
3151631KERR 6
80/20
1.6151.615
3151641KERR 7
80/20
1.6151.615
3152661PLYWOOD A
80/20
2.0932.093
316118AC1-105 C
80/20
1.5721.572
316129AC1-054 C
80/20
1.0481.048
316131AB2-060 C
80/20
2.042.04
940081AE1-250 C
80/20
12.86112.861
941031AE2-094 C
80/20
138.215138.215
941801AE2-185 C
80/20
4.3664.366
946301AF1-294 C
80/20
4.7464.746
957481AF2-042 C
80/20
129.887129.887
958211AF2-115 C
80/20
2.8862.886
3151021BRUNSWICKG1
80/20
25.15625.156
3151031BRUNSWICKG2
80/20
25.15625.156
3151041BRUNSWICKG3
80/20
25.15625.156
3151051BRUNSWICKS1
80/20
52.26552.265
3152411Z1-086 GT1
80/20
33.47333.473
3152421Z1-086 GT2
80/20
33.46433.464
3152431Z1-086 GT3
80/20
33.46433.464
3152441Z1-086 ST
80/20
58.26658.266
957601AF2-054 C
Adder
-1.8-1.53
964211AG1-282 C
Adder
-1.7011764705882353-1.446
942001AE2-212 C
Adder
-2.010588235294118-1.709
936261AD2-033 C
80/20
17.43217.432
941671AE2-166 C
80/20
5.45.4
933291AC2-141 C
Adder
-32.203529411764706-27.373
934621AD1-088 C
80/20
21.36821.368
24684305SMG1
80/20
1.0911.091
24684405SMG2
80/20
3.0033.003
24684505SMG3
80/20
1.8451.845
24684605SMG4
80/20
3.0033.003
24684705SMG5
80/20
1.1411.141
316003AC1-222 C
80/20
1.7441.744
316034AC1-036 C
80/20
0.3110.311
316049AB1-081 C OP
80/20
0.9230.923
316222AC1-221 C
80/20
2.6372.637
316237AB2-079 C O1
80/20
0.4550.455
316238AB2-078 C O1
80/20
0.4550.455
316239AB2-077 C O1
80/20
0.4550.455
316240AF1-291 C
Adder
-1.9317647058823528-1.642
316248AF1-058 C
80/20
0.5710.571
316263AC1-034 C
80/20
4.3284.328
316283AC2-100 C
80/20
2.1162.116
316322AB2-045 C
80/20
0.2270.227
316217AC1-145 C
80/20
0.3750.375
270197AC1-083 C
80/20
0.9340.934
313527AB2-043 C
80/20
0.7110.711
316359AB2-059 C OP
80/20
1.0881.088
316197AC1-042 C
80/20
0.3150.315
316123AC1-075 C
80/20
1.3531.353
316205AC1-080 C
80/20
0.4520.452
962561AG1-105 C
80/20
14.10814.108
964241AG1-285 C
80/20
17.07617.076
934611AD1-087 C
80/20
2.842.84
935171AD1-152 C
80/20
2.8492.849
936161AD2-022 C
80/20
12.15912.159
936171AD2-023 C
80/20
7.0937.093
937481AD2-202 C
80/20
0.8240.824
938531AE1-072 C
Adder
-16.01294117647059-13.611
940641AE2-051 C
Adder
-21.040000000000003-17.884
941431AE2-140 C
80/20
13.39313.393
942461AE2-259 C
80/20
12.19912.199
944641AF1-129 C
Adder
-90.49176470588236-76.918
938741AE1-100 C
80/20
0.690.69
940601AE2-047 C
80/20
4.0274.027
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.2639.263
CBM West 1LTFEXP_CBM-W1->PJM
CBM
71.06671.066
CBM West 2LTFEXP_CBM-W2->PJM
CBM
44.76444.764
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
170.641170.641
NYPJM->LTFIMP_NY
CLTF
2.1082.108
LGEELTFEXP_LGEE->PJM
CLTF
2.7422.742
WECLTFEXP_WEC->PJM
CLTF
1.451.45
CPLELTFEXP_CPLE->PJM
CLTF
19.41719.417
TVALTFEXP_TVA->PJM
CLTF
11.71211.712
MECLTFEXP_MEC->PJM
CLTF
8.3488.348
LAGNLTFEXP_LAGN->PJM
CLTF
14.84614.846
SIGELTFEXP_SIGE->PJM
CLTF
0.5240.524
CONTINGENCY 'DVP_P1-2: LN 585_SRT-A-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 941030 CKT 1   /*8CARSON      500.0 - AE2-094 TP   500.0
END
CONTINGENCY 'DVP_P1-2: LN 585_SRT-A-2'
 OPEN BRANCH FROM BUS 314940 TO BUS 941030 CKT 1   /*8ROGERS RD   500.0 - AE2-094 TP   500.0
END
CONTINGENCY 'DVP_P1-2: LN 511_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314936 CKT 1                /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
314936 to 314902 ckt 1
941030 to 314902 ckt 1

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Base Case
OPAC149.29 %167.0A249.3121.45
GD1AEP
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
OPAC144.76 %245.0B354.6620.97
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Base Case
OPAC151.42 %167.0A252.8721.45
GD1AEP
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
OPAC146.26 %245.0B358.3520.97
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Base Case
OPAC152.76 %167.0A255.121.45
GD1AEP/DVP
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
AEP_P1-2_#3174_6_SRT-A
OPAC147.23 %245.0B360.7220.97
GD1DVP
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC100.26 %678.68B680.457.93
GD1DVP
6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC107.58 %571.52B614.8210.52
GD1DVP
6FINNEYWOOD-6BRIERY 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC108.24 %571.52B618.6110.52
GD1DVP
6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC100.43 %661.76B664.598.12
GD1DVP
6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC107.58 %571.52B614.8110.52
GD1DVP
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
DVP_P1-2: LN 562_SRT-S
OPAC110.36 %3118.0B3440.9312.6
GD1DVP
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 585_SRT-A-1
OPAC108.69 %4070.2B4423.7221.72
GD1DVP
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
DVP_P1-2: LN 511_SRT-S
OPAC105.93 %4070.2B4311.7119.28

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:149.29 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:249.31
MW Contribution:21.45
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:116.56 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:194.66
MW Contribution:21.16
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
50/50
1.761.76
3151561HALLBR1
50/50
2.682.68
926274AC1-105 E
Adder
0.920.782
926646AC1-145 E
50/50
5.9155.915
942671AE2-283 C
50/50
9.7139.713
942672AE2-283 E
50/50
8.6738.673
942751AE2-291 C
50/50
12.8712.87
942752AE2-291 E
50/50
8.588.58
943902AF1-058 E
Adder
0.50823529411764710.432
940081AE1-250 C
Adder
5.1941176470588244.415
940082AE1-250 E
Adder
3.46235294117647062.943
941801AE2-185 C
50/50
12.48912.489
941802AE2-185 E
50/50
8.3268.326
926055AC1-083 E
Adder
5.6364705882352944.791
927264AC1-222 E
Adder
2.3070588235294121.961
316217AC1-145 C
50/50
1.0771.077
316197AC1-042 C
50/50
0.9050.905
925665AC1-042 E
50/50
9.0339.033
316123AC1-075 C
50/50
1.1311.131
925997AC1-075 E
50/50
3.9223.922
316205AC1-080 C
50/50
0.3780.378
926024AC1-080 E
50/50
1.3011.301
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1740.174
NYPJM->LTFIMP_NY
CLTF
0.090.09
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
O66PJM->LTFIMP_O-066
CMTX_NF
1.1121.112
MDUPJM->LTFIMP_MDU
CLTF
00

Details for 05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:144.76 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:354.66
MW Contribution:20.97
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
50/50
1.7261.726
3151561HALLBR1
50/50
2.6232.623
926274AC1-105 E
Adder
0.88705882352941180.754
926646AC1-145 E
50/50
5.85.8
942671AE2-283 C
50/50
9.5269.526
942672AE2-283 E
50/50
8.5058.505
942751AE2-291 C
50/50
12.5812.58
942752AE2-291 E
50/50
8.3878.387
943902AF1-058 E
Adder
0.491764705882352940.418
940081AE1-250 C
Adder
5.20470588235294154.424
940082AE1-250 E
Adder
3.47058823529411782.95
941801AE2-185 C
50/50
12.24712.247
941802AE2-185 E
50/50
8.1658.165
926055AC1-083 E
Adder
5.5800000000000014.743
927264AC1-222 E
Adder
2.24117647058823531.905
316217AC1-145 C
50/50
1.0561.056
316197AC1-042 C
50/50
0.8870.887
925665AC1-042 E
50/50
8.8598.859
316123AC1-075 C
50/50
1.1051.105
925997AC1-075 E
50/50
3.833.83
316205AC1-080 C
50/50
0.3690.369
926024AC1-080 E
50/50
1.2711.271
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
G-007PJM->LTFIMP_G-007
CMTX_NF
0.4340.434
NYPJM->LTFIMP_NY
CLTF
0.20.2
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033
O66PJM->LTFIMP_O-066
CMTX_NF
2.7632.763

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:151.42 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:252.87
MW Contribution:21.45
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:118.61 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:198.08
MW Contribution:21.16
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
50/50
1.761.76
3151561HALLBR1
50/50
2.682.68
926274AC1-105 E
Adder
0.920.782
926646AC1-145 E
50/50
5.9155.915
942671AE2-283 C
50/50
9.7139.713
942672AE2-283 E
50/50
8.6738.673
942751AE2-291 C
50/50
12.8712.87
942752AE2-291 E
50/50
8.588.58
943902AF1-058 E
Adder
0.50823529411764710.432
940081AE1-250 C
Adder
5.1941176470588244.415
940082AE1-250 E
Adder
3.46235294117647062.943
941801AE2-185 C
50/50
12.48912.489
941802AE2-185 E
50/50
8.3268.326
926055AC1-083 E
Adder
5.6364705882352944.791
927264AC1-222 E
Adder
2.3070588235294121.961
316217AC1-145 C
50/50
1.0771.077
316197AC1-042 C
50/50
0.9050.905
925665AC1-042 E
50/50
9.0339.033
316123AC1-075 C
50/50
1.1311.131
925997AC1-075 E
50/50
3.9223.922
316205AC1-080 C
50/50
0.3780.378
926024AC1-080 E
50/50
1.3011.301
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1740.174
NYPJM->LTFIMP_NY
CLTF
0.090.09
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
O66PJM->LTFIMP_O-066
CMTX_NF
1.1121.112
MDUPJM->LTFIMP_MDU
CLTF
00

Details for 05OTTER-05JOHNMT 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05OTTER-05JOHNMT 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:146.26 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:358.35
MW Contribution:20.97
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
50/50
1.7261.726
3151561HALLBR1
50/50
2.6232.623
926274AC1-105 E
Adder
0.88705882352941180.754
926646AC1-145 E
50/50
5.85.8
942671AE2-283 C
50/50
9.5269.526
942672AE2-283 E
50/50
8.5058.505
942751AE2-291 C
50/50
12.5812.58
942752AE2-291 E
50/50
8.3878.387
943902AF1-058 E
Adder
0.491764705882352940.418
940081AE1-250 C
Adder
5.20470588235294154.424
940082AE1-250 E
Adder
3.47058823529411782.95
941801AE2-185 C
50/50
12.24712.247
941802AE2-185 E
50/50
8.1658.165
926055AC1-083 E
Adder
5.5800000000000014.743
927264AC1-222 E
Adder
2.24117647058823531.905
316217AC1-145 C
50/50
1.0561.056
316197AC1-042 C
50/50
0.8870.887
925665AC1-042 E
50/50
8.8598.859
316123AC1-075 C
50/50
1.1051.105
925997AC1-075 E
50/50
3.833.83
316205AC1-080 C
50/50
0.3690.369
926024AC1-080 E
50/50
1.2711.271
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
G-007PJM->LTFIMP_G-007
CMTX_NF
0.4340.434
NYPJM->LTFIMP_NY
CLTF
0.20.2
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033
O66PJM->LTFIMP_O-066
CMTX_NF
2.7632.763

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:152.76 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:255.1
MW Contribution:21.45
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:119.87 %
Rating:167.0 MVA
Rating Type:A
MVA to Mitigate:200.18
MW Contribution:21.16
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
50/50
1.761.76
3151561HALLBR1
50/50
2.682.68
926274AC1-105 E
Adder
0.920.782
926646AC1-145 E
50/50
5.9155.915
942671AE2-283 C
50/50
9.7139.713
942672AE2-283 E
50/50
8.6738.673
942751AE2-291 C
50/50
12.8712.87
942752AE2-291 E
50/50
8.588.58
943902AF1-058 E
Adder
0.50823529411764710.432
940081AE1-250 C
Adder
5.1941176470588244.415
940082AE1-250 E
Adder
3.46235294117647062.943
941801AE2-185 C
50/50
12.48912.489
941802AE2-185 E
50/50
8.3268.326
926055AC1-083 E
Adder
5.6364705882352944.791
927264AC1-222 E
Adder
2.3070588235294121.961
316217AC1-145 C
50/50
1.0771.077
316197AC1-042 C
50/50
0.9050.905
925665AC1-042 E
50/50
9.0339.033
316123AC1-075 C
50/50
1.1311.131
925997AC1-075 E
50/50
3.9223.922
316205AC1-080 C
50/50
0.3780.378
926024AC1-080 E
50/50
1.3011.301
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.010.01
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.5750.575
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
8.1328.132
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1740.174
NYPJM->LTFIMP_NY
CLTF
0.090.09
CPLELTFEXP_CPLE->PJM
CLTF
1.1261.126
TVALTFEXP_TVA->PJM
CLTF
0.2310.231
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0340.034
MECLTFEXP_MEC->PJM
CLTF
0.0010.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.10.1
LAGNLTFEXP_LAGN->PJM
CLTF
0.3230.323
O66PJM->LTFIMP_O-066
CMTX_NF
1.1121.112
MDUPJM->LTFIMP_MDU
CLTF
00

Details for 4ALTVSTA-05OTTER 138.0 kV Ckt 1 line l/o AEP_P1-2_#3174_6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DVP
Facility Description:
4ALTVSTA-05OTTER 138.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#3174_6_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:147.23 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:360.72
MW Contribution:20.97
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
50/50
1.7261.726
3151561HALLBR1
50/50
2.6232.623
926274AC1-105 E
Adder
0.88705882352941180.754
926646AC1-145 E
50/50
5.85.8
942671AE2-283 C
50/50
9.5269.526
942672AE2-283 E
50/50
8.5058.505
942751AE2-291 C
50/50
12.5812.58
942752AE2-291 E
50/50
8.3878.387
943902AF1-058 E
Adder
0.491764705882352940.418
940081AE1-250 C
Adder
5.20470588235294154.424
940082AE1-250 E
Adder
3.47058823529411782.95
941801AE2-185 C
50/50
12.24712.247
941802AE2-185 E
50/50
8.1658.165
926055AC1-083 E
Adder
5.5800000000000014.743
927264AC1-222 E
Adder
2.24117647058823531.905
316217AC1-145 C
50/50
1.0561.056
316197AC1-042 C
50/50
0.8870.887
925665AC1-042 E
50/50
8.8598.859
316123AC1-075 C
50/50
1.1051.105
925997AC1-075 E
50/50
3.833.83
316205AC1-080 C
50/50
0.3690.369
926024AC1-080 E
50/50
1.2711.271
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5940.594
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.4074.407
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.8292.829
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
10.75510.755
G-007PJM->LTFIMP_G-007
CMTX_NF
0.4340.434
NYPJM->LTFIMP_NY
CLTF
0.20.2
LGEELTFEXP_LGEE->PJM
CLTF
0.1770.177
WECLTFEXP_WEC->PJM
CLTF
0.0910.091
CPLELTFEXP_CPLE->PJM
CLTF
1.2461.246
TVALTFEXP_TVA->PJM
CLTF
0.7460.746
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LAGNLTFEXP_LAGN->PJM
CLTF
0.9350.935
SIGELTFEXP_SIGE->PJM
CLTF
0.0330.033
O66PJM->LTFIMP_O-066
CMTX_NF
2.7632.763

Details for 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.26 %
Rating:678.68 MVA
Rating Type:B
MVA to Mitigate:680.45
MW Contribution:7.93
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:101.41 %
Rating:678.68 MVA
Rating Type:B
MVA to Mitigate:688.25
MW Contribution:7.99
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
50/50
2.562.56
961792AG1-021 E
50/50
2.182.18
964791AG1-342 C
Adder
3.142.669
964792AG1-342 E
Adder
2.0929411764705881.779
966621AG1-532 C
Adder
0.55294117647058830.47
966622AG1-532 E
Adder
0.368235294117647050.313
3138533PONTONDP
50/50
0.9480.948
3144293JTRSVLE
50/50
0.5890.589
3145723EMPORIA
Adder
0.169411764705882350.144
3147133PAMPLIN
50/50
1.5021.502
3151531CLOVER1
50/50
12.53612.536
925785AC1-054 E
Adder
2.0988235294117651.784
926274AC1-105 E
Adder
2.2764705882352941.935
942751AE2-291 C
Adder
4.7576470588235294.044
942752AE2-291 E
Adder
3.1717647058823532.696
943902AF1-058 E
Adder
1.04588235294117650.889
959311AF2-222 C
50/50
21.42121.421
959312AF2-222 E
50/50
14.35214.352
960081AF2-299 C
Adder
0.73647058823529410.626
960082AF2-299 E
Adder
0.491764705882352940.418
923573AB1-173 E OP
Adder
1.2764705882352941.085
924162AB2-060 E OP
Adder
4.3211764705882353.673
924302AB2-077 E O1
Adder
1.30823529411764721.112
924312AB2-078 E O1
Adder
1.30823529411764721.112
924322AB2-079 E O1
Adder
1.30823529411764721.112
925612AC1-036 E
50/50
1.0811.081
946281AF1-292 C
Adder
0.60941176470588240.518
946282AF1-292 E
Adder
0.407058823529411750.346
946301AF1-294 C
50/50
5.2615.261
946302AF1-294 E
50/50
4.4554.455
957481AF2-042 C
50/50
54.50854.508
957482AF2-042 E
50/50
36.33936.339
958211AF2-115 C
50/50
3.1993.199
958212AF2-115 E
50/50
2.7252.725
940451AE2-029 C
Adder
-2.123529411764706-1.805
924032AB2-045 E
50/50
3.0983.098
933502AC2-165 E
50/50
11.1411.14
958502AF2-144 E
50/50
1.5111.511
3151911BEARGRDN G1
50/50
13.62513.625
3151921BEARGRDN G2
50/50
13.62513.625
923862AB2-026 E
50/50
1.5381.538
938562AE1-075 E
50/50
1.3111.311
3147223TWITTYS
50/50
1.1981.198
936261AD2-033 C
50/50
15.36515.365
936262AD2-033 E
50/50
10.24310.243
934621AD1-088 C
50/50
10.46110.461
934622AD1-088 E
50/50
5.0375.037
3151931BEARGRDN S1
50/50
17.62717.627
316034AC1-036 C
50/50
0.2950.295
316258AE1-075 C
50/50
0.4360.436
316313AB2-026 C
50/50
0.4750.475
316322AB2-045 C
50/50
0.6910.691
316336AC2-165 C
50/50
14.80214.802
316405AF2-144 C
50/50
0.370.37
927255AC1-221 E
Adder
2.41411764705882352.052
927264AC1-222 E
Adder
3.14588235294117662.674
932763AC2-100 E
Adder
1.5964705882352941.357
923994AB2-040_E
Adder
2.3941176470588242.035
924022AB2-043 E O1
Adder
5.1494117647058824.377
316088AB2-174 E
Adder
2.5470588235294122.165
925997AC1-075 E
Adder
1.91882352941176481.631
926024AC1-080 E
Adder
0.63647058823529420.541
962561AG1-105 C
Adder
8.0270588235294126.823
962562AG1-105 E
Adder
5.3517647058823544.549
964241AG1-285 C
50/50
1414
964242AG1-285 E
50/50
9.3349.334
934612AD1-087 E
Adder
3.55764705882352943.024
935172AD1-152 E
Adder
4.9823529411764714.235
937482AD2-202 E
Adder
1.04117647058823540.885
938821AE1-108 C
Adder
8.3517647058823537.099
938822AE1-108 E
Adder
3.98470588235294133.387
942461AE2-259 C
50/50
16.85316.853
942462AE2-259 E
50/50
11.23511.235
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.5941.594
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.5572.557
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
24.92724.927
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6230.623
NYPJM->LTFIMP_NY
CLTF
0.3380.338
CPLELTFEXP_CPLE->PJM
CLTF
3.3493.349
TVALTFEXP_TVA->PJM
CLTF
0.9190.919
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0350.035
MECLTFEXP_MEC->PJM
CLTF
0.1670.167
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0870.087
LAGNLTFEXP_LAGN->PJM
CLTF
1.2151.215
SIGELTFEXP_SIGE->PJM
CLTF
0.0040.004
O66PJM->LTFIMP_O-066
CMTX_NF
4.0034.003

Details for 6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:107.58 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:614.82
MW Contribution:10.52
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:112.99 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:645.76
MW Contribution:10.76
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
964791AG1-342 C
50/50
3.7243.724
964792AG1-342 E
50/50
2.4822.482
966621AG1-532 C
Adder
0.437647058823529440.372
966622AG1-532 E
Adder
0.29176470588235290.248
3145723EMPORIA
Adder
0.136470588235294120.116
3151531CLOVER1
50/50
19.51919.519
3151541CLOVER2
50/50
19.33819.338
3151581KERR 1
50/50
0.3970.397
3151591KERR 2
50/50
1.1131.113
3151601KERR 3
50/50
1.1131.113
3151611KERR 4
50/50
1.1131.113
3151621KERR 5
50/50
1.1131.113
919692AA2-053 E OP
Adder
1.31411764705882361.117
925785AC1-054 E
50/50
2.3712.371
926274AC1-105 E
50/50
2.892.89
942751AE2-291 C
50/50
6.3136.313
942752AE2-291 E
50/50
4.2094.209
943902AF1-058 E
50/50
1.4231.423
959311AF2-222 C
Adder
9.9482352941176468.456
959312AF2-222 E
Adder
6.66588235294117755.666
960081AF2-299 C
Adder
0.58352941176470590.496
960082AF2-299 E
Adder
0.38941176470588240.331
3151631KERR 6
50/50
1.1131.113
3151641KERR 7
50/50
1.1131.113
3152661PLYWOOD A
50/50
1.3061.306
316118AC1-105 C
50/50
0.9880.988
316129AC1-054 C
50/50
0.8410.841
316131AB2-060 C
50/50
1.3891.389
923573AB1-173 E OP
Adder
1.06470588235294120.905
924162AB2-060 E OP
50/50
3.9993.999
924302AB2-077 E O1
50/50
1.321.32
924312AB2-078 E O1
50/50
1.321.32
924322AB2-079 E O1
50/50
1.321.32
925612AC1-036 E
50/50
0.6080.608
941011AE2-092 C
Adder
-7.384705882352941-6.277
946281AF1-292 C
Adder
0.48352941176470590.411
946282AF1-292 E
Adder
0.32235294117647060.274
957481AF2-042 C
50/50
85.94285.942
957482AF2-042 E
50/50
57.29557.295
3147223TWITTYS
50/50
0.6740.674
936261AD2-033 C
Adder
5.2729411764705894.482
936262AD2-033 E
Adder
3.5152941176470592.988
934621AD1-088 C
50/50
16.77816.778
934622AD1-088 E
50/50
8.0788.078
316003AC1-222 C
50/50
1.0461.046
316034AC1-036 C
50/50
0.1660.166
316222AC1-221 C
50/50
1.3041.304
316237AB2-079 C O1
50/50
0.3240.324
316238AB2-078 C O1
50/50
0.3240.324
316239AB2-077 C O1
50/50
0.3240.324
316248AF1-058 C
50/50
0.3490.349
316283AC2-100 C
50/50
1.0191.019
316336AC2-165 C
Adder
-4.488235294117647-3.815
927255AC1-221 E
50/50
3.413.41
927264AC1-222 E
50/50
4.2714.271
932763AC2-100 E
50/50
2.2422.242
923994AB2-040_E
Adder
1.99764705882352931.698
313527AB2-043 C
50/50
0.5090.509
924022AB2-043 E O1
50/50
5.1075.107
316088AB2-174 E
Adder
2.0917647058823531.778
316123AC1-075 C
50/50
0.740.74
925997AC1-075 E
50/50
2.5662.566
316205AC1-080 C
50/50
0.2470.247
926024AC1-080 E
50/50
0.8510.851
962561AG1-105 C
50/50
9.2429.242
962562AG1-105 E
50/50
6.1616.161
964241AG1-285 C
50/50
16.2716.27
964242AG1-285 E
50/50
10.84610.846
3137643SOCKMAN
Adder
0.236470588235294130.201
934611AD1-087 C
50/50
1.9191.919
934612AD1-087 E
50/50
5.5365.536
935171AD1-152 C
50/50
1.8391.839
935172AD1-152 E
50/50
7.5637.563
937481AD2-202 C
50/50
0.5570.557
937482AD2-202 E
50/50
1.621.62
938821AE1-108 C
Adder
-8.042352941176471-6.836
942461AE2-259 C
Adder
-11.085882352941177-9.423
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.6471.647
CBM West 1LTFEXP_CBM-W1->PJM
CBM
7.2877.287
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.6115.611
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
27.50427.504
G-007PJM->LTFIMP_G-007
CMTX_NF
0.610.61
NYPJM->LTFIMP_NY
CLTF
0.2910.291
LGEELTFEXP_LGEE->PJM
CLTF
0.2860.286
WECLTFEXP_WEC->PJM
CLTF
0.1510.151
CPLELTFEXP_CPLE->PJM
CLTF
3.4573.457
TVALTFEXP_TVA->PJM
CLTF
1.5461.546
MECLTFEXP_MEC->PJM
CLTF
0.9490.949
LAGNLTFEXP_LAGN->PJM
CLTF
1.9781.978
SIGELTFEXP_SIGE->PJM
CLTF
0.0570.057
O66PJM->LTFIMP_O-066
CMTX_NF
3.8923.892

Details for 6FINNEYWOOD-6BRIERY 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FINNEYWOOD-6BRIERY 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:108.24 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:618.61
MW Contribution:10.52
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FINNEYWOOD-6BRIERY 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:113.66 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:649.58
MW Contribution:10.76
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
964791AG1-342 C
50/50
3.7243.724
964792AG1-342 E
50/50
2.4822.482
966621AG1-532 C
Adder
0.437647058823529440.372
966622AG1-532 E
Adder
0.29176470588235290.248
3145723EMPORIA
Adder
0.136470588235294120.116
3151531CLOVER1
50/50
19.51919.519
3151541CLOVER2
50/50
19.33819.338
3151581KERR 1
50/50
0.3970.397
3151591KERR 2
50/50
1.1131.113
3151601KERR 3
50/50
1.1131.113
3151611KERR 4
50/50
1.1131.113
3151621KERR 5
50/50
1.1131.113
919692AA2-053 E OP
Adder
1.31411764705882361.117
925785AC1-054 E
50/50
2.3712.371
926274AC1-105 E
50/50
2.892.89
942751AE2-291 C
50/50
6.3136.313
942752AE2-291 E
50/50
4.2094.209
943902AF1-058 E
50/50
1.4231.423
959311AF2-222 C
Adder
9.9482352941176468.456
959312AF2-222 E
Adder
6.66588235294117755.666
960081AF2-299 C
Adder
0.58352941176470590.496
960082AF2-299 E
Adder
0.38941176470588240.331
3151631KERR 6
50/50
1.1131.113
3151641KERR 7
50/50
1.1131.113
3152661PLYWOOD A
50/50
1.3061.306
316118AC1-105 C
50/50
0.9880.988
316129AC1-054 C
50/50
0.8410.841
316131AB2-060 C
50/50
1.3891.389
923573AB1-173 E OP
Adder
1.06470588235294120.905
924162AB2-060 E OP
50/50
3.9993.999
924302AB2-077 E O1
50/50
1.321.32
924312AB2-078 E O1
50/50
1.321.32
924322AB2-079 E O1
50/50
1.321.32
925612AC1-036 E
50/50
0.6080.608
941011AE2-092 C
Adder
-7.384705882352941-6.277
946281AF1-292 C
Adder
0.48352941176470590.411
946282AF1-292 E
Adder
0.32235294117647060.274
957481AF2-042 C
50/50
85.94285.942
957482AF2-042 E
50/50
57.29557.295
3147223TWITTYS
50/50
0.6740.674
936261AD2-033 C
Adder
5.2729411764705894.482
936262AD2-033 E
Adder
3.5152941176470592.988
934621AD1-088 C
50/50
16.77816.778
934622AD1-088 E
50/50
8.0788.078
316003AC1-222 C
50/50
1.0461.046
316034AC1-036 C
50/50
0.1660.166
316222AC1-221 C
50/50
1.3041.304
316237AB2-079 C O1
50/50
0.3240.324
316238AB2-078 C O1
50/50
0.3240.324
316239AB2-077 C O1
50/50
0.3240.324
316248AF1-058 C
50/50
0.3490.349
316283AC2-100 C
50/50
1.0191.019
316336AC2-165 C
Adder
-4.488235294117647-3.815
927255AC1-221 E
50/50
3.413.41
927264AC1-222 E
50/50
4.2714.271
932763AC2-100 E
50/50
2.2422.242
923994AB2-040_E
Adder
1.99764705882352931.698
313527AB2-043 C
50/50
0.5090.509
924022AB2-043 E O1
50/50
5.1075.107
316088AB2-174 E
Adder
2.0917647058823531.778
316123AC1-075 C
50/50
0.740.74
925997AC1-075 E
50/50
2.5662.566
316205AC1-080 C
50/50
0.2470.247
926024AC1-080 E
50/50
0.8510.851
962561AG1-105 C
50/50
9.2429.242
962562AG1-105 E
50/50
6.1616.161
964241AG1-285 C
50/50
16.2716.27
964242AG1-285 E
50/50
10.84610.846
3137643SOCKMAN
Adder
0.236470588235294130.201
934611AD1-087 C
50/50
1.9191.919
934612AD1-087 E
50/50
5.5365.536
935171AD1-152 C
50/50
1.8391.839
935172AD1-152 E
50/50
7.5637.563
937481AD2-202 C
50/50
0.5570.557
937482AD2-202 E
50/50
1.621.62
938821AE1-108 C
Adder
-8.042352941176471-6.836
942461AE2-259 C
Adder
-11.085882352941177-9.423
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.6471.647
CBM West 1LTFEXP_CBM-W1->PJM
CBM
7.2877.287
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.6115.611
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
27.50427.504
G-007PJM->LTFIMP_G-007
CMTX_NF
0.610.61
NYPJM->LTFIMP_NY
CLTF
0.2910.291
LGEELTFEXP_LGEE->PJM
CLTF
0.2860.286
WECLTFEXP_WEC->PJM
CLTF
0.1510.151
CPLELTFEXP_CPLE->PJM
CLTF
3.4573.457
TVALTFEXP_TVA->PJM
CLTF
1.5461.546
MECLTFEXP_MEC->PJM
CLTF
0.9490.949
LAGNLTFEXP_LAGN->PJM
CLTF
1.9781.978
SIGELTFEXP_SIGE->PJM
CLTF
0.0570.057
O66PJM->LTFIMP_O-066
CMTX_NF
3.8923.892

Details for 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.43 %
Rating:661.76 MVA
Rating Type:B
MVA to Mitigate:664.59
MW Contribution:8.12
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:104.65 %
Rating:661.76 MVA
Rating Type:B
MVA to Mitigate:692.56
MW Contribution:8.31
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
50/50
2.3932.393
961792AG1-021 E
50/50
2.0382.038
964791AG1-342 C
Adder
2.96941176470588262.524
964792AG1-342 E
Adder
1.98000000000000021.683
3138533PONTONDP
50/50
0.8860.886
3144293JTRSVLE
50/50
0.5510.551
3147133PAMPLIN
50/50
1.4031.403
3151531CLOVER1
50/50
11.77811.778
925785AC1-054 E
Adder
1.96941176470588241.674
926274AC1-105 E
Adder
2.161.836
942751AE2-291 C
Adder
4.8729411764705884.142
942752AE2-291 E
Adder
3.24941176470588242.762
943902AF1-058 E
Adder
0.99529411764705880.846
959311AF2-222 C
50/50
20.05320.053
959312AF2-222 E
50/50
13.43613.436
924162AB2-060 E OP
Adder
4.0564705882352943.448
924302AB2-077 E O1
Adder
1.22941176470588221.045
924312AB2-078 E O1
Adder
1.22941176470588221.045
924322AB2-079 E O1
Adder
1.22941176470588221.045
925612AC1-036 E
50/50
1.0121.012
941011AE2-092 C
50/50
17.26517.265
941012AE2-092 E
50/50
11.5111.51
946301AF1-294 C
50/50
4.9194.919
946302AF1-294 E
50/50
4.1654.165
957481AF2-042 C
50/50
51.1751.17
957482AF2-042 E
50/50
34.11434.114
958131AF2-107 C
Adder
3.683.128
958132AF2-107 E
Adder
2.01647058823529421.714
958211AF2-115 C
50/50
2.9912.991
958212AF2-115 E
50/50
2.5482.548
940451AE2-029 C
Adder
-2.083529411764706-1.771
924032AB2-045 E
50/50
2.8862.886
933502AC2-165 E
50/50
10.34410.344
958502AF2-144 E
50/50
1.4021.402
3151911BEARGRDN G1
50/50
12.67512.675
3151921BEARGRDN G2
50/50
12.67512.675
923862AB2-026 E
50/50
1.4271.427
938562AE1-075 E
50/50
1.2171.217
3147223TWITTYS
50/50
1.1221.122
936261AD2-033 C
50/50
14.39414.394
936262AD2-033 E
50/50
9.5969.596
934621AD1-088 C
50/50
9.8099.809
934622AD1-088 E
50/50
4.7234.723
3151931BEARGRDN S1
50/50
16.39716.397
316034AC1-036 C
50/50
0.2760.276
316258AE1-075 C
50/50
0.4040.404
316313AB2-026 C
50/50
0.4410.441
316322AB2-045 C
50/50
0.6440.644
316336AC2-165 C
50/50
13.74413.744
316405AF2-144 C
50/50
0.3440.344
927255AC1-221 E
Adder
2.28823529411764741.945
927264AC1-222 E
Adder
3.01882352941176452.566
932763AC2-100 E
Adder
1.51411764705882361.287
924022AB2-043 E O1
Adder
4.8352941176470594.11
925997AC1-075 E
Adder
1.9235294117647061.635
926024AC1-080 E
Adder
0.63882352941176480.543
962561AG1-105 C
Adder
7.5811764705882356.444
962562AG1-105 E
Adder
5.0541176470588244.296
964241AG1-285 C
50/50
13.1313.13
964242AG1-285 E
50/50
8.7538.753
934612AD1-087 E
Adder
3.3423529411764712.841
935172AD1-152 E
Adder
4.6929411764705893.989
937482AD2-202 E
Adder
0.97882352941176460.832
938821AE1-108 C
50/50
25.39325.393
938822AE1-108 E
50/50
12.11612.116
942461AE2-259 C
50/50
15.73115.731
942462AE2-259 E
50/50
10.48710.487
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.531.53
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.2770.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.0313.031
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
24.38324.383
G-007PJM->LTFIMP_G-007
CMTX_NF
0.640.64
NYPJM->LTFIMP_NY
CLTF
0.3410.341
LGEELTFEXP_LGEE->PJM
CLTF
0.0360.036
WECLTFEXP_WEC->PJM
CLTF
0.0140.014
CPLELTFEXP_CPLE->PJM
CLTF
3.2143.214
TVALTFEXP_TVA->PJM
CLTF
1.011.01
MECLTFEXP_MEC->PJM
CLTF
0.30.3
LAGNLTFEXP_LAGN->PJM
CLTF
1.3161.316
SIGELTFEXP_SIGE->PJM
CLTF
0.0140.014
O66PJM->LTFIMP_O-066
CMTX_NF
4.1084.108

Details for 6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:107.58 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:614.81
MW Contribution:10.52
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:112.99 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:645.76
MW Contribution:10.76
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
964791AG1-342 C
50/50
3.7243.724
964792AG1-342 E
50/50
2.4822.482
966621AG1-532 C
Adder
0.437647058823529440.372
966622AG1-532 E
Adder
0.29176470588235290.248
3145723EMPORIA
Adder
0.136470588235294120.116
3151531CLOVER1
50/50
19.51919.519
3151541CLOVER2
50/50
19.33819.338
3151581KERR 1
50/50
0.3970.397
3151591KERR 2
50/50
1.1131.113
3151601KERR 3
50/50
1.1131.113
3151611KERR 4
50/50
1.1131.113
3151621KERR 5
50/50
1.1131.113
919692AA2-053 E OP
Adder
1.31411764705882361.117
925785AC1-054 E
50/50
2.3712.371
926274AC1-105 E
50/50
2.892.89
942751AE2-291 C
50/50
6.3136.313
942752AE2-291 E
50/50
4.2094.209
943902AF1-058 E
50/50
1.4231.423
959311AF2-222 C
Adder
9.9482352941176468.456
959312AF2-222 E
Adder
6.66588235294117755.666
960081AF2-299 C
Adder
0.58352941176470590.496
960082AF2-299 E
Adder
0.38941176470588240.331
3151631KERR 6
50/50
1.1131.113
3151641KERR 7
50/50
1.1131.113
3152661PLYWOOD A
50/50
1.3061.306
316118AC1-105 C
50/50
0.9880.988
316129AC1-054 C
50/50
0.8410.841
316131AB2-060 C
50/50
1.3891.389
923573AB1-173 E OP
Adder
1.06470588235294120.905
924162AB2-060 E OP
50/50
3.9993.999
924302AB2-077 E O1
50/50
1.321.32
924312AB2-078 E O1
50/50
1.321.32
924322AB2-079 E O1
50/50
1.321.32
925612AC1-036 E
50/50
0.6080.608
941011AE2-092 C
Adder
-7.384705882352941-6.277
946281AF1-292 C
Adder
0.48352941176470590.411
946282AF1-292 E
Adder
0.32235294117647060.274
957481AF2-042 C
50/50
85.94285.942
957482AF2-042 E
50/50
57.29557.295
3147223TWITTYS
50/50
0.6740.674
936261AD2-033 C
Adder
5.2729411764705894.482
936262AD2-033 E
Adder
3.5152941176470592.988
934621AD1-088 C
50/50
16.77816.778
934622AD1-088 E
50/50
8.0788.078
316003AC1-222 C
50/50
1.0461.046
316034AC1-036 C
50/50
0.1660.166
316222AC1-221 C
50/50
1.3041.304
316237AB2-079 C O1
50/50
0.3240.324
316238AB2-078 C O1
50/50
0.3240.324
316239AB2-077 C O1
50/50
0.3240.324
316248AF1-058 C
50/50
0.3490.349
316283AC2-100 C
50/50
1.0191.019
316336AC2-165 C
Adder
-4.488235294117647-3.815
927255AC1-221 E
50/50
3.413.41
927264AC1-222 E
50/50
4.2714.271
932763AC2-100 E
50/50
2.2422.242
923994AB2-040_E
Adder
1.99764705882352931.698
313527AB2-043 C
50/50
0.5090.509
924022AB2-043 E O1
50/50
5.1075.107
316088AB2-174 E
Adder
2.0917647058823531.778
316123AC1-075 C
50/50
0.740.74
925997AC1-075 E
50/50
2.5662.566
316205AC1-080 C
50/50
0.2470.247
926024AC1-080 E
50/50
0.8510.851
962561AG1-105 C
50/50
9.2429.242
962562AG1-105 E
50/50
6.1616.161
964241AG1-285 C
50/50
16.2716.27
964242AG1-285 E
50/50
10.84610.846
3137643SOCKMAN
Adder
0.236470588235294130.201
934611AD1-087 C
50/50
1.9191.919
934612AD1-087 E
50/50
5.5365.536
935171AD1-152 C
50/50
1.8391.839
935172AD1-152 E
50/50
7.5637.563
937481AD2-202 C
50/50
0.5570.557
937482AD2-202 E
50/50
1.621.62
938821AE1-108 C
Adder
-8.042352941176471-6.836
942461AE2-259 C
Adder
-11.085882352941177-9.423
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.6471.647
CBM West 1LTFEXP_CBM-W1->PJM
CBM
7.2877.287
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.6115.611
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
27.50427.504
G-007PJM->LTFIMP_G-007
CMTX_NF
0.610.61
NYPJM->LTFIMP_NY
CLTF
0.2910.291
LGEELTFEXP_LGEE->PJM
CLTF
0.2860.286
WECLTFEXP_WEC->PJM
CLTF
0.1510.151
CPLELTFEXP_CPLE->PJM
CLTF
3.4573.457
TVALTFEXP_TVA->PJM
CLTF
1.5461.546
MECLTFEXP_MEC->PJM
CLTF
0.9490.949
LAGNLTFEXP_LAGN->PJM
CLTF
1.9781.978
SIGELTFEXP_SIGE->PJM
CLTF
0.0570.057
O66PJM->LTFIMP_O-066
CMTX_NF
3.8923.892

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 562_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 562_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:110.36 %
Rating:3118.0 MVA
Rating Type:B
MVA to Mitigate:3440.93
MW Contribution:12.6
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 562_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:113.29 %
Rating:3118.0 MVA
Rating Type:B
MVA to Mitigate:3532.41
MW Contribution:13.56
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961671AG1-007 C
Adder
1.07294117647058830.912
961672AG1-007 E
Adder
0.60823529411764710.517
961791AG1-021 C
Adder
1.80470588235294121.534
961792AG1-021 E
Adder
1.53764705882352941.307
961941AG1-037 C
Adder
0.54705882352941180.465
961942AG1-037 E
Adder
0.364705882352941160.31
963041AG1-153 C
50/50
9.2519.251
963042AG1-153 E
50/50
13.87613.876
964791AG1-342 C
50/50
4.3544.354
964792AG1-342 E
50/50
2.9022.902
966621AG1-532 C
50/50
1.7051.705
966622AG1-532 E
50/50
1.1371.137
313506AB1-173 C OP
50/50
1.3471.347
3138533PONTONDP
Adder
0.6682352941176470.568
3145413WATKINS
Adder
0.7117647058823530.605
3145723EMPORIA
50/50
0.5220.522
3147043LAWRENC
50/50
0.3770.377
3147133PAMPLIN
Adder
0.99882352941176470.849
3151311EDGECMA
Adder
18.0294117647058815.325
3151361ROSEMG1
50/50
2.3922.392
3151371ROSEMS1
50/50
1.4821.482
3151381ROSEMG2
50/50
1.121.12
3151391GASTONA
50/50
3.5873.587
3151531CLOVER1
50/50
17.61117.611
3151541CLOVER2
50/50
17.44717.447
3151581KERR 1
50/50
0.5070.507
3151591KERR 2
50/50
1.4211.421
3151601KERR 3
50/50
1.4211.421
3151611KERR 4
50/50
1.4211.421
3151621KERR 5
50/50
1.4211.421
918492AA1-063AE OP
Adder
4.6188235294117653.926
918532AA1-067 E
Adder
0.79411764705882360.675
919692AA2-053 E OP
Adder
4.8717647058823534.141
920042AA2-088 E OP
Adder
11.3505882352941179.648
925785AC1-054 E
50/50
4.1514.151
926274AC1-105 E
50/50
3.2853.285
927146AC1-208 E
Adder
4.6141176470588243.922
934521AD1-076 C
Adder
12.58941176470588310.701
934522AD1-076 E
Adder
6.4164705882352945.454
942751AE2-291 C
Adder
7.5611764705882356.427
942752AE2-291 E
Adder
5.0411764705882364.285
943172AE2-346 E
Adder
0.65647058823529430.558
943902AF1-058 E
Adder
1.57294117647058831.337
944011AF1-069 C
50/50
22.14222.142
944012AF1-069 E
50/50
8.6028.602
959311AF2-222 C
50/50
19.68319.683
959312AF2-222 E
50/50
13.18813.188
960081AF2-299 C
50/50
2.2732.273
960082AF2-299 E
50/50
1.5151.515
3151631KERR 6
50/50
1.4211.421
3151641KERR 7
50/50
1.4211.421
3152661PLYWOOD A
50/50
1.481.48
316118AC1-105 C
50/50
1.1221.122
316129AC1-054 C
50/50
1.4721.472
316131AB2-060 C
50/50
1.841.84
316141AB2-099 E
Adder
0.27411764705882360.233
900672V4-068 E
Adder
0.38470588235294120.327
917342Z2-044 E
Adder
0.69294117647058820.589
922923AB1-081 E OP
Adder
4.3305882352941183.681
923263AB1-132 E OP
50/50
7.1847.184
923573AB1-173 E OP
50/50
3.9183.918
924162AB2-060 E OP
50/50
5.2985.298
924302AB2-077 E O1
50/50
1.6651.665
924312AB2-078 E O1
50/50
1.6651.665
924322AB2-079 E O1
50/50
1.6651.665
925612AC1-036 E
50/50
1.0321.032
940492AE2-034 E
Adder
3.10117647058823562.636
941031AE2-094 C
50/50
67.76767.767
941032AE2-094 E
50/50
30.35130.351
946281AF1-292 C
50/50
1.8821.882
946282AF1-292 E
50/50
1.2541.254
946301AF1-294 C
Adder
3.71058823529411753.154
946302AF1-294 E
Adder
3.14235294117647032.671
957481AF2-042 C
50/50
77.56977.569
957482AF2-042 E
50/50
51.71351.713
957861AF2-080 C
Adder
8.6200000000000017.327
957862AF2-080 E
Adder
3.8211764705882363.248
958211AF2-115 C
Adder
2.2564705882352941.918
958212AF2-115 E
Adder
1.92235294117647061.634
3145393UNCAMP
Adder
6.1494117647058835.227
916042Z1-036 E
Adder
27.86705882352941523.687
938771AE1-103 C
Adder
2.9258823529411772.487
938772AE1-103 E
Adder
4.043.434
3143316POE
Adder
1.37294117647058831.167
3145256KINGFORK
Adder
0.88470588235294120.752
3145506HICKORY
Adder
1.97176470588235291.676
926662AC1-147 E
Adder
1.1682352941176470.993
926755AC1-161 E
Adder
9.4658823529411768.046
935112AD1-144 E
Adder
0.82235294117647050.699
942341AE2-247 C
Adder
1.37647058823529411.17
942342AE2-247 E
Adder
1.90117647058823551.616
943461AF1-017 C
Adder
1.24588235294117641.059
943462AF1-017 E
Adder
2.03294117647058851.728
943612AF1-032 E
Adder
0.86470588235294120.735
3151021BRUNSWICKG1
50/50
13.65513.655
3151031BRUNSWICKG2
50/50
13.65513.655
3151041BRUNSWICKG3
50/50
13.65513.655
3151051BRUNSWICKS1
50/50
28.36928.369
3151411GASTONB
50/50
3.5873.587
3152411Z1-086 GT1
50/50
17.59317.593
3152421Z1-086 GT2
50/50
17.58617.586
3152431Z1-086 GT3
50/50
17.58617.586
3152441Z1-086 ST
50/50
30.62530.625
913392Y1-086 E
Adder
2.04470588235294141.738
916192Z1-068 E
Adder
1.681.428
923832AB2-022 E
Adder
1.15411764705882350.981
923852AB2-025 E
50/50
1.4871.487
939312AE1-162 E
Adder
1.10352941176470590.938
957492AF2-043 E
Adder
1.33058823529411761.131
901082W1-029 E
Adder
30.21176470588235225.68
917122Z2-027 E
Adder
1.2588235294117651.07
925522AC1-027 E
Adder
1.08705882352941190.924
942001AE2-212 C
Adder
1.66470588235294131.415
942002AE2-212 E
Adder
1.10941176470588230.943
957871AF2-081 C
Adder
9.127.752
957872AF2-081 E
Adder
3.9082352941176473.322
958161AF2-110 C
Adder
1.28705882352941181.094
958162AF2-110 E
Adder
2.0482352941176471.741
3147223TWITTYS
50/50
1.1441.144
917512Z2-088 E OP1
Adder
5.5647058823529424.73
926071AC1-086 C
50/50
24.68624.686
926072AC1-086 E
50/50
11.23511.235
927021AC1-189 C
Adder
9.4905882352941178.067
927022AC1-189 E
Adder
4.7270588235294114.018
936261AD2-033 C
Adder
14.85882352941176512.63
936262AD2-033 E
Adder
9.9058823529411778.42
933291AC2-141 C
Adder
22.1752941176470618.849
933292AC2-141 E
Adder
9.4658823529411768.046
934621AD1-088 C
50/50
12.78812.788
934622AD1-088 E
50/50
6.1576.157
939411AE1-173 C
50/50
131.733131.733
939412AE1-173 E
50/50
87.82287.822
933981AD1-022 C
Adder
9.1035294117647067.738
933982AD1-022 E
Adder
4.9552941176470594.212
962572AG1-106 E
50/50
1.3971.397
962571AG1-106 C
50/50
3.1933.193
3145946PLYMOUTH TP
Adder
0.33176470588235290.282
3146326AYDLETT TAP
Adder
1.24352941176470581.057
316011AB1-132 C OP
50/50
2.7392.739
316023AB2-100 C2
50/50
1.1741.174
316034AC1-036 C
50/50
0.2810.281
316237AB2-079 C O1
50/50
0.4080.408
316238AB2-078 C O1
50/50
0.4080.408
316239AB2-077 C O1
50/50
0.4080.408
316263AC1-034 C
Adder
7.7152941176470586.558
316274AC1-208 C
Adder
10.3917647058823548.833
316315AB2-025 C
50/50
0.5220.522
316365AB2-100 C1
50/50
1.1741.174
917332KELFORD E
Adder
1.81647058823529431.544
924516AB2-100 E1
50/50
3.5383.538
924517AB2-100 E2
50/50
3.5383.538
925595AC1-034 E
Adder
5.824.947
926206AC1-098 E
Adder
4.163.536
926214AC1-099 E
Adder
1.37411764705882341.168
927255AC1-221 E
Adder
4.5388235294117653.858
927264AC1-222 E
Adder
4.7623529411764714.048
932763AC2-100 E
Adder
3.07764705882352942.616
934065AD1-033 E
Adder
4.5188235294117653.841
937226AE2-253 E
Adder
5.3141176470588244.517
918512AA1-065 E OP
Adder
5.9082352941176485.022
919153AA1-139 E2
Adder
3.72941176470588243.17
919152AA1-139 E1
Adder
3.72941176470588243.17
919710AA2-057 E
Adder
4.582352941176473.895
920692AA2-178 E
Adder
4.1341176470588233.514
316181AB2-040 GEN
50/50
1.5171.517
923994AB2-040_E
50/50
7.3457.345
313527AB2-043 C
50/50
0.6440.644
924022AB2-043 E O1
50/50
6.4666.466
924152AB2-059 E OP
Adder
6.1352941176470595.215
316084AB2-161 E
Adder
4.9458823529411764.204
925122AB2-169 E
Adder
6.13764705882352955.217
316087AB2-174 C
50/50
1.4141.414
316088AB2-174 E
50/50
7.8297.829
925997AC1-075 E
Adder
3.00117647058823562.551
926024AC1-080 E
Adder
0.99529411764705880.846
932046AC2-012 E
Adder
11.569.826
316311AC2-079 C
Adder
5.3058823529411764.51
932596AC2-079 E
Adder
8.657647058823537.359
934576AD1-082 E
Adder
3.94000000000000043.349
316349AD2-085 C
Adder
3.17647058823529442.7
936666AD2-085 E
Adder
5.1823529411764714.405
961611AG1-000B C
Adder
7.1482352941176476.076
941591AE2-156 C
Adder
15.80117647058823513.431
944581AF1-123 C
Adder
40.92117647058823634.783
944582AF1-123 E
Adder
93.7058823529411979.65
944591AF1-124 C
Adder
41.0670588235294134.907
944592AF1-124 E
Adder
94.0458823529411879.939
944601AF1-125 C
Adder
40.2917647058823534.248
944602AF1-125 E
Adder
92.2352941176470778.4
962561AG1-105 C
50/50
10.94410.944
962562AG1-105 E
50/50
7.2967.296
964241AG1-285 C
50/50
16.41216.412
964242AG1-285 E
50/50
10.94110.941
3137643SOCKMAN
50/50
0.840.84
932632AC2-084 E
Adder
3.67764705882352953.126
934321AD1-056 C
Adder
7.3117647058823536.215
934322AD1-056 E
Adder
3.96588235294117643.371
934331AD1-057 C
Adder
4.0788235294117653.467
934332AD1-057 E
Adder
2.12470588235294141.806
934501AD1-074 C
Adder
34.6658823529411829.466
934502AD1-074 E
Adder
17.64705882352941315
934511AD1-075 C
Adder
8.6670588235294137.367
934512AD1-075 E
Adder
4.4117647058823533.75
934611AD1-087 C
50/50
1.7341.734
934612AD1-087 E
50/50
5.0015.001
935171AD1-152 C
50/50
1.7771.777
935172AD1-152 E
50/50
7.3117.311
936161AD2-022 C
Adder
8.3070588235294117.061
936162AD2-022 E
Adder
4.9847058823529424.237
936171AD2-023 C
Adder
4.8458823529411764.119
936172AD2-023 E
Adder
2.6305882352941182.236
937481AD2-202 C
50/50
0.5030.503
937482AD2-202 E
50/50
1.4641.464
938531AE1-072 C
Adder
16.09529411764705713.681
938532AE1-072 E
Adder
8.3905882352941187.132
939191AE1-149 C
Adder
9.3894117647058827.981
939192AE1-149 E
Adder
6.265.321
940481AE2-033 C
50/50
20.60920.609
940482AE2-033 E
50/50
13.89413.894
940541AE2-040 C
50/50
3.6773.677
940641AE2-051 C
Adder
11.86941176470588410.089
940642AE2-051 E
Adder
7.9129411764705886.726
941101AE2-104 C
Adder
3.1552941176470592.682
941102AE2-104 E
Adder
5.0152941176470594.263
942461AE2-259 C
Adder
8.6164705882352957.324
942462AE2-259 E
Adder
5.74352941176470564.882
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
6.7816.781
CBM West 1LTFEXP_CBM-W1->PJM
CBM
33.14933.149
CBM West 2LTFEXP_CBM-W2->PJM
CBM
25.07725.077
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
116.28116.28
G-007PJM->LTFIMP_G-007
CMTX_NF
3.6713.671
NYPJM->LTFIMP_NY
CLTF
1.7121.712
LGEELTFEXP_LGEE->PJM
CLTF
1.3031.303
WECLTFEXP_WEC->PJM
CLTF
0.6880.688
CPLELTFEXP_CPLE->PJM
CLTF
14.22614.226
TVALTFEXP_TVA->PJM
CLTF
6.8686.868
MECLTFEXP_MEC->PJM
CLTF
4.2814.281
LAGNLTFEXP_LAGN->PJM
CLTF
8.7928.792
SIGELTFEXP_SIGE->PJM
CLTF
0.260.26
O66PJM->LTFIMP_O-066
CMTX_NF
23.37723.377

Details for 8RAWLINGS-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 585_SRT-A-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 585_SRT-A-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:108.69 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4423.72
MW Contribution:21.72
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
8RAWLINGS-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 585_SRT-A-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:114.82 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4673.36
MW Contribution:22.52
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
Adder
3.08941176470588232.626
961792AG1-021 E
Adder
2.6317647058823532.237
963041AG1-153 C
50/50
17.36617.366
963042AG1-153 E
50/50
26.04926.049
964791AG1-342 C
50/50
7.2097.209
964792AG1-342 E
50/50
4.8064.806
3138533PONTONDP
Adder
1.14470588235294120.973
3147133PAMPLIN
50/50
1.8091.809
3151531CLOVER1
50/50
32.82932.829
3151541CLOVER2
50/50
32.52432.524
3151581KERR 1
50/50
0.7110.711
3151591KERR 2
50/50
1.991.99
3151601KERR 3
50/50
1.991.99
3151611KERR 4
50/50
1.991.99
3151621KERR 5
50/50
1.991.99
925785AC1-054 E
Adder
3.75647058823529443.193
926274AC1-105 E
50/50
5.5465.546
942751AE2-291 C
Adder
13.03294117647058811.078
942752AE2-291 E
Adder
8.6882352941176467.385
943902AF1-058 E
50/50
2.7082.708
944011AF1-069 C
50/50
39.18539.185
944012AF1-069 E
50/50
15.22215.222
959311AF2-222 C
50/50
34.76234.762
959312AF2-222 E
50/50
23.29123.291
24401205PINNACLE
Adder
1.62588235294117631.382
3151631KERR 6
50/50
1.991.99
3151641KERR 7
50/50
1.991.99
3152661PLYWOOD A
50/50
2.4812.481
316118AC1-105 C
50/50
1.8951.895
316131AB2-060 C
50/50
2.8942.894
924162AB2-060 E OP
50/50
8.3338.333
924302AB2-077 E O1
50/50
2.6052.605
924312AB2-078 E O1
50/50
2.6052.605
924322AB2-079 E O1
50/50
2.6052.605
925612AC1-036 E
50/50
1.8171.817
941031AE2-094 C
50/50
119.928119.928
941032AE2-094 E
50/50
53.71353.713
946301AF1-294 C
Adder
6.3505882352941185.398
946302AF1-294 E
Adder
5.377647058823534.571
957481AF2-042 C
50/50
147.496147.496
957482AF2-042 E
50/50
98.33198.331
958211AF2-115 C
Adder
3.86117647058823543.282
958212AF2-115 E
Adder
3.2894117647058822.796
924032AB2-045 E
Adder
1.26941176470588221.079
3151021BRUNSWICKG1
50/50
25.63425.634
3151031BRUNSWICKG2
50/50
25.63425.634
3151041BRUNSWICKG3
50/50
25.63425.634
3151051BRUNSWICKS1
50/50
53.25453.254
3152411Z1-086 GT1
50/50
32.42432.424
3152421Z1-086 GT2
50/50
32.41332.413
3152431Z1-086 GT3
50/50
32.41332.413
3152441Z1-086 ST
50/50
56.44456.444
957601AF2-054 C
Adder
-1.72-1.462
942001AE2-212 C
Adder
-1.9541176470588235-1.661
3147223TWITTYS
50/50
2.0152.015
936261AD2-033 C
50/50
24.11624.116
936262AD2-033 E
50/50
16.07816.078
933291AC2-141 C
Adder
-31.96117647058824-27.167
934621AD1-088 C
50/50
23.87723.877
934622AD1-088 E
50/50
11.49611.496
316003AC1-222 C
50/50
2.0082.008
316034AC1-036 C
50/50
0.4960.496
316222AC1-221 C
50/50
2.9122.912
316237AB2-079 C O1
50/50
0.6390.639
316238AB2-078 C O1
50/50
0.6390.639
316239AB2-077 C O1
50/50
0.6390.639
316240AF1-291 C
Adder
-1.863529411764706-1.584
316248AF1-058 C
50/50
0.6640.664
316283AC2-100 C
50/50
2.3312.331
927255AC1-221 E
50/50
7.6147.614
927264AC1-222 E
50/50
8.2018.201
932763AC2-100 E
50/50
5.1295.129
313527AB2-043 C
50/50
1.011.01
924022AB2-043 E O1
50/50
10.1410.14
925997AC1-075 E
Adder
5.1705882352941174.395
926024AC1-080 E
Adder
1.71529411764705891.458
962561AG1-105 C
50/50
17.96517.965
962562AG1-105 E
50/50
11.97711.977
964241AG1-285 C
50/50
28.57228.572
964242AG1-285 E
50/50
19.04819.048
934611AD1-087 C
50/50
3.233.23
934612AD1-087 E
50/50
9.3199.319
935171AD1-152 C
50/50
3.2363.236
935172AD1-152 E
50/50
13.31413.314
936161AD2-022 C
Adder
12.41176470588235310.55
936162AD2-022 E
Adder
7.4470588235294126.33
936171AD2-023 C
Adder
7.246.154
936172AD2-023 E
Adder
3.9305882352941183.341
937481AD2-202 C
50/50
0.9370.937
937482AD2-202 E
50/50
2.7272.727
938531AE1-072 C
Adder
-16.06705882352941-13.657
940641AE2-051 C
Adder
-21.288235294117648-18.095
942461AE2-259 C
Adder
16.0152941176470613.613
942462AE2-259 E
Adder
10.6764705882352939.075
944641AF1-129 C
Adder
-87.13882352941177-74.068
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.4399.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
59.04159.041
CBM West 2LTFEXP_CBM-W2->PJM
CBM
40.12440.124
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
169.426169.426
G-007PJM->LTFIMP_G-007
CMTX_NF
4.1284.128
NYPJM->LTFIMP_NY
CLTF
1.8831.883
LGEELTFEXP_LGEE->PJM
CLTF
2.2642.264
WECLTFEXP_WEC->PJM
CLTF
1.2081.208
CPLELTFEXP_CPLE->PJM
CLTF
19.79519.795
TVALTFEXP_TVA->PJM
CLTF
10.7110.71
MECLTFEXP_MEC->PJM
CLTF
7.1897.189
LAGNLTFEXP_LAGN->PJM
CLTF
13.6813.68
SIGELTFEXP_SIGE->PJM
CLTF
0.4430.443
O66PJM->LTFIMP_O-066
CMTX_NF
26.2626.26

Details for AE2-094 TP-8CARSON 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 511_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 511_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:105.93 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4311.71
MW Contribution:19.28
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
AE2-094 TP-8CARSON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 511_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:112.26 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4569.37
MW Contribution:20.19
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
Adder
2.68823529411764732.285
961792AG1-021 E
Adder
2.28941176470588251.946
963041AG1-153 C
50/50
17.20617.206
963042AG1-153 E
50/50
25.80825.808
964791AG1-342 C
50/50
6.3476.347
964792AG1-342 E
50/50
4.2324.232
3138533PONTONDP
Adder
0.99529411764705880.846
3147133PAMPLIN
50/50
1.5711.571
3151531CLOVER1
50/50
28.70828.708
3151541CLOVER2
50/50
28.44128.441
3151581KERR 1
50/50
0.6270.627
3151591KERR 2
50/50
1.7561.756
3151601KERR 3
50/50
1.7561.756
3151611KERR 4
50/50
1.7561.756
3151621KERR 5
50/50
1.7561.756
925785AC1-054 E
Adder
3.30235294117647052.807
926274AC1-105 E
50/50
4.8944.894
942751AE2-291 C
Adder
11.5670588235294139.832
942752AE2-291 E
Adder
7.7105882352941186.554
943902AF1-058 E
50/50
2.3942.394
944011AF1-069 C
50/50
45.64245.642
944012AF1-069 E
50/50
17.73117.731
959311AF2-222 C
50/50
30.29330.293
959312AF2-222 E
50/50
20.29620.296
24401205PINNACLE
Adder
1.53647058823529431.306
3151631KERR 6
50/50
1.7561.756
3151641KERR 7
50/50
1.7561.756
3152661PLYWOOD A
50/50
2.1912.191
316118AC1-105 C
50/50
1.6721.672
316131AB2-060 C
50/50
2.5322.532
924162AB2-060 E OP
50/50
7.2927.292
924302AB2-077 E O1
50/50
2.2822.282
924312AB2-078 E O1
50/50
2.2822.282
924322AB2-079 E O1
50/50
2.2822.282
925612AC1-036 E
50/50
1.5841.584
941031AE2-094 C
50/50
139.691139.691
941032AE2-094 E
50/50
62.56462.564
946301AF1-294 C
Adder
5.5247058823529414.696
946302AF1-294 E
Adder
4.6788235294117653.977
957481AF2-042 C
50/50
128.648128.648
957482AF2-042 E
50/50
85.76685.766
958211AF2-115 C
Adder
3.362.856
958212AF2-115 E
Adder
2.86235294117647052.433
3151021BRUNSWICKG1
50/50
25.39725.397
3151031BRUNSWICKG2
50/50
25.39725.397
3151041BRUNSWICKG3
50/50
25.39725.397
3151051BRUNSWICKS1
50/50
52.76252.762
3152411Z1-086 GT1
50/50
33.84633.846
3152421Z1-086 GT2
50/50
33.83433.834
3152431Z1-086 GT3
50/50
33.83433.834
3152441Z1-086 ST
50/50
58.91958.919
957601AF2-054 C
Adder
-1.6305882352941177-1.386
942001AE2-212 C
Adder
-1.851764705882353-1.574
3147223TWITTYS
50/50
1.7561.756
936261AD2-033 C
50/50
21.05721.057
936262AD2-033 E
50/50
14.03814.038
933291AC2-141 C
Adder
-30.18235294117647-25.655
934621AD1-088 C
50/50
20.82320.823
934622AD1-088 E
50/50
10.02610.026
316003AC1-222 C
50/50
1.7761.776
316034AC1-036 C
50/50
0.4320.432
316222AC1-221 C
50/50
2.632.63
316237AB2-079 C O1
50/50
0.5590.559
316238AB2-078 C O1
50/50
0.5590.559
316239AB2-077 C O1
50/50
0.5590.559
316240AF1-291 C
Adder
-1.7670588235294118-1.502
316248AF1-058 C
50/50
0.5870.587
316283AC2-100 C
50/50
2.112.11
927255AC1-221 E
50/50
6.8776.877
927264AC1-222 E
50/50
7.2547.254
932763AC2-100 E
50/50
4.6444.644
313527AB2-043 C
50/50
0.8840.884
924022AB2-043 E O1
50/50
8.8758.875
925997AC1-075 E
Adder
4.5835294117647063.896
926024AC1-080 E
Adder
1.52117647058823541.293
962561AG1-105 C
50/50
15.80415.804
962562AG1-105 E
50/50
10.53610.536
964241AG1-285 C
50/50
24.94424.944
964242AG1-285 E
50/50
16.62916.629
934611AD1-087 C
50/50
2.8252.825
934612AD1-087 E
50/50
8.158.15
935171AD1-152 C
50/50
2.8452.845
935172AD1-152 E
50/50
11.70511.705
936161AD2-022 C
Adder
11.7541176470588239.991
936162AD2-022 E
Adder
7.0529411764705895.995
936171AD2-023 C
Adder
6.8564705882352955.828
936172AD2-023 E
Adder
3.7223529411764713.164
937481AD2-202 C
50/50
0.820.82
937482AD2-202 E
50/50
2.3852.385
938531AE1-072 C
Adder
-15.17764705882353-12.901
940641AE2-051 C
Adder
-20.06823529411765-17.058
942461AE2-259 C
Adder
13.86823529411764811.788
942462AE2-259 E
Adder
9.2458823529411777.859
944641AF1-129 C
Adder
-82.61058823529412-70.219
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.0719.071
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5656
CBM West 2LTFEXP_CBM-W2->PJM
CBM
38.3338.33
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
162.815162.815
G-007PJM->LTFIMP_G-007
CMTX_NF
3.9723.972
NYPJM->LTFIMP_NY
CLTF
1.8141.814
LGEELTFEXP_LGEE->PJM
CLTF
2.1482.148
WECLTFEXP_WEC->PJM
CLTF
1.1471.147
CPLELTFEXP_CPLE->PJM
CLTF
19.02319.023
TVALTFEXP_TVA->PJM
CLTF
10.24910.249
MECLTFEXP_MEC->PJM
CLTF
6.8436.843
LAGNLTFEXP_LAGN->PJM
CLTF
13.09813.098
SIGELTFEXP_SIGE->PJM
CLTF
0.4210.421
O66PJM->LTFIMP_O-066
CMTX_NF
25.2725.27
CONTINGENCY 'AEP_P1-2_#3174_6_SRT-A'
 OPEN BRANCH FROM BUS 242512 TO BUS 242515 CKT 1   /*05CLOVRD     765.0 - 05JOSHUA     765.0
END
CONTINGENCY 'DVP_P1-2: LN 556_SRT-S-3'
 OPEN BRANCH FROM BUS 313995 TO BUS 314936 CKT 1                /*8FINNEYWOOD  500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
CONTINGENCY 'DVP_P1-2: LN 562_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1                /*8CARSON      500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 314927 CKT 1 /*8SEPTA       500.0 - 8YADKIN      500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 314914 CKT 1 /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314923 TO BUS 314927 CKT 1 /*8SEPTA       500.0 - 8YADKIN      500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 314914 CKT 1 /*8CARSON      500.0 - 8MDLTHAN     500.0
END
CONTINGENCY 'DVP_P1-2: LN 585_SRT-A-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 941030 CKT 1   /*8CARSON      500.0 - AE2-094 TP   500.0
END
CONTINGENCY 'DVP_P1-2: LN 511_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314936 CKT 1                /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
242687 to 242734 ckt 1
242741 to 242687 ckt 1
314667 to 242741 ckt 1
314747 to 313867 ckt 1
314268 to 313802 ckt 1
313996 to 314268 ckt 1
313707 to 313373 ckt 1
313802 to 314692 ckt 1
314902 to 314914 ckt 1
314936 to 314902 ckt 1
941030 to 314902 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1DVP
3HUBER DP-3SEDGE HILL 115.0 kV Ckt 1 line
AEP_P1-2_#5366_42_SRT-A-1
OPAC100.93 %285.76B288.4151.57
GD1DVP
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC100.36 %678.68B681.17.99
GD1DVP
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
DVP_P1-2: LN 556_SRT-S-3
OPAC101.93 %661.76B674.528.31
GD1DVP
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 line
DVP_P1-2: LN 511_SRT-S
OPAC105.31 %4070.2B4286.2620.19
GD1DVP
AC1-222 TAP-3HUBER DP 115.0 kV Ckt 1 line
AEP_P1-2_#5366_42_SRT-A-1
OPAC101.1 %285.76B288.9151.57

Details for 3HUBER DP-3SEDGE HILL 115.0 kV Ckt 1 line l/o AEP_P1-2_#5366_42_SRT-A-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3HUBER DP-3SEDGE HILL 115.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#5366_42_SRT-A-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.93 %
Rating:285.76 MVA
Rating Type:B
MVA to Mitigate:288.41
MW Contribution:51.57
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
50/50
1.3291.329
3151561HALLBR1
50/50
2.242.24
926646AC1-145 E
50/50
3.7973.797
942671AE2-283 C
50/50
6.2366.236
942672AE2-283 E
50/50
5.5685.568
942751AE2-291 C
50/50
30.9430.94
942752AE2-291 E
50/50
20.62720.627
940081AE1-250 C
50/50
10.17910.179
940082AE1-250 E
50/50
6.7866.786
941801AE2-185 C
50/50
8.0188.018
941802AE2-185 E
50/50
5.3455.345
24684305SMG1
50/50
1.1971.197
24684405SMG2
50/50
3.2973.297
24684505SMG3
50/50
2.0262.026
24684605SMG4
50/50
3.2973.297
24684705SMG5
50/50
1.2521.252
316003AC1-222 C
50/50
5.0075.007
926055AC1-083 E
50/50
8.4158.415
927264AC1-222 E
50/50
20.52320.523
962751AG1-124 C
Adder
3.48588235294117642.963
962752AG1-124 E
Adder
2.43294117647058842.068
316217AC1-145 C
50/50
0.6890.689
270197AC1-083 C
50/50
0.840.84
270173AC1-122 C
50/50
0.890.89
926516AC1-122_E
50/50
2.5722.572
316197AC1-042 C
50/50
0.5790.579
925665AC1-042 E
50/50
5.85.8
316123AC1-075 C
50/50
3.5893.589
925997AC1-075 E
50/50
12.4912.49
316205AC1-080 C
50/50
1.1991.199
926024AC1-080 E
50/50
4.1444.144
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
1.2571.257
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.3476.347
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.451.45
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.2550.255
NYPJM->LTFIMP_NY
CLTF
0.0970.097
LGEELTFEXP_LGEE->PJM
CLTF
0.2620.262
WECLTFEXP_WEC->PJM
CLTF
0.1270.127
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.7150.715
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.2460.246
TVALTFEXP_TVA->PJM
CLTF
0.1930.193
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LAGNLTFEXP_LAGN->PJM
CLTF
0.1510.151
SIGELTFEXP_SIGE->PJM
CLTF
0.0410.041
O66PJM->LTFIMP_O-066
CMTX_NF
1.6111.611

Details for 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.36 %
Rating:678.68 MVA
Rating Type:B
MVA to Mitigate:681.1
MW Contribution:7.99
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
50/50
2.5392.539
961792AG1-021 E
50/50
2.1632.163
964791AG1-342 C
Adder
3.1117647058823532.645
964792AG1-342 E
Adder
2.07411764705882361.763
966621AG1-532 C
Adder
0.55764705882352940.474
966622AG1-532 E
Adder
0.371764705882352940.316
3138533PONTONDP
50/50
0.940.94
3144293JTRSVLE
50/50
0.5820.582
3145723EMPORIA
Adder
0.171764705882352930.146
3147133PAMPLIN
50/50
1.4771.477
3151531CLOVER1
50/50
12.77812.778
925785AC1-054 E
Adder
2.10941176470588231.793
926274AC1-105 E
Adder
2.2752941176470591.934
942751AE2-291 C
Adder
4.79529411764705854.076
942752AE2-291 E
Adder
3.19647058823529442.717
943902AF1-058 E
Adder
1.05411764705882360.896
959311AF2-222 C
50/50
20.59920.599
959312AF2-222 E
50/50
13.80113.801
960081AF2-299 C
Adder
0.74352941176470590.632
960082AF2-299 E
Adder
0.49647058823529410.422
923573AB1-173 E OP
Adder
1.29411764705882361.1
924162AB2-060 E OP
Adder
4.20352941176470553.573
924302AB2-077 E O1
Adder
1.27411764705882361.083
924312AB2-078 E O1
Adder
1.27411764705882361.083
924322AB2-079 E O1
Adder
1.27411764705882361.083
925612AC1-036 E
50/50
1.0361.036
946281AF1-292 C
Adder
0.61647058823529410.524
946282AF1-292 E
Adder
0.410588235294117640.349
946301AF1-294 C
50/50
5.2195.219
946302AF1-294 E
50/50
4.424.42
957481AF2-042 C
50/50
55.82355.823
957482AF2-042 E
50/50
37.21537.215
958211AF2-115 C
50/50
3.1743.174
958212AF2-115 E
50/50
2.7042.704
940451AE2-029 C
Adder
-2.1141176470588237-1.797
924032AB2-045 E
50/50
3.1133.113
933502AC2-165 E
50/50
11.23311.233
958502AF2-144 E
50/50
1.5271.527
3151911BEARGRDN G1
50/50
13.62713.627
3151921BEARGRDN G2
50/50
13.62713.627
923862AB2-026 E
50/50
1.5541.554
938552AE1-074 E
Adder
0.452941176470588240.385
938562AE1-075 E
50/50
1.3251.325
3147223TWITTYS
50/50
1.1481.148
936261AD2-033 C
50/50
15.09515.095
936262AD2-033 E
50/50
10.06310.063
934621AD1-088 C
50/50
10.73210.732
934622AD1-088 E
50/50
5.1675.167
3151931BEARGRDN S1
50/50
17.62917.629
316034AC1-036 C
50/50
0.2820.282
316233AE1-074 C
Adder
0.89882352941176480.764
316258AE1-075 C
50/50
0.4390.439
316313AB2-026 C
50/50
0.4780.478
316322AB2-045 C
50/50
0.6920.692
316336AC2-165 C
50/50
14.92414.924
316405AF2-144 C
50/50
0.3730.373
927255AC1-221 E
Adder
2.46000000000000042.091
927264AC1-222 E
Adder
3.1717647058823532.696
932763AC2-100 E
Adder
1.6270588235294121.383
923994AB2-040_E
Adder
2.42588235294117642.062
924022AB2-043 E O1
Adder
5.0035294117647064.253
316088AB2-174 E
Adder
2.5788235294117652.192
925997AC1-075 E
Adder
1.93411764705882351.644
926024AC1-080 E
Adder
0.64117647058823530.545
962561AG1-105 C
Adder
7.92823529411764756.739
962562AG1-105 E
Adder
5.2847058823529424.492
964241AG1-285 C
Adder
13.1552941176470611.182
964242AG1-285 E
Adder
8.7694117647058827.454
934612AD1-087 E
Adder
3.63882352941176463.093
935172AD1-152 E
Adder
5.0858823529411774.323
937482AD2-202 E
Adder
1.06470588235294120.905
938821AE1-108 C
Adder
8.4470588235294127.18
938822AE1-108 E
Adder
4.0305882352941183.426
942461AE2-259 C
50/50
16.80116.801
942462AE2-259 E
50/50
11.20111.201
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.6411.641
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.6212.621
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
25.67825.678
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6560.656
NYPJM->LTFIMP_NY
CLTF
0.3550.355
CPLELTFEXP_CPLE->PJM
CLTF
3.4493.449
TVALTFEXP_TVA->PJM
CLTF
0.9450.945
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0370.037
MECLTFEXP_MEC->PJM
CLTF
0.1680.168
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0950.095
LAGNLTFEXP_LAGN->PJM
CLTF
1.2491.249
SIGELTFEXP_SIGE->PJM
CLTF
0.0040.004
O66PJM->LTFIMP_O-066
CMTX_NF
4.2154.215

Details for 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 556_SRT-S-3


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 556_SRT-S-3
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:101.93 %
Rating:661.76 MVA
Rating Type:B
MVA to Mitigate:674.52
MW Contribution:8.31
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
50/50
2.3762.376
961792AG1-021 E
50/50
2.0242.024
964791AG1-342 C
Adder
2.9517647058823532.509
964792AG1-342 E
Adder
1.9682352941176471.673
3138533PONTONDP
50/50
0.880.88
3144293JTRSVLE
50/50
0.5440.544
3147133PAMPLIN
50/50
1.3811.381
3151531CLOVER1
50/50
12.02912.029
925785AC1-054 E
Adder
1.98117647058823531.684
926274AC1-105 E
Adder
2.16588235294117661.841
942751AE2-291 C
Adder
4.9847058823529424.237
942752AE2-291 E
Adder
3.3235294117647062.825
943902AF1-058 E
Adder
1.00705882352941180.856
959311AF2-222 C
50/50
19.30519.305
959312AF2-222 E
50/50
12.93512.935
924162AB2-060 E OP
Adder
3.95294117647058843.36
924302AB2-077 E O1
Adder
1.19882352941176461.019
924312AB2-078 E O1
Adder
1.19882352941176461.019
924322AB2-079 E O1
Adder
1.19882352941176461.019
925612AC1-036 E
50/50
0.9710.971
941011AE2-092 C
50/50
17.36117.361
941012AE2-092 E
50/50
11.57411.574
946301AF1-294 C
50/50
4.8844.884
946302AF1-294 E
50/50
4.1364.136
957481AF2-042 C
50/50
52.49452.494
957482AF2-042 E
50/50
34.99634.996
958131AF2-107 C
Adder
3.74941176470588243.187
958132AF2-107 E
Adder
2.0552941176470591.747
958211AF2-115 C
50/50
2.972.97
958212AF2-115 E
50/50
2.532.53
940451AE2-029 C
Adder
-2.0752941176470587-1.764
924032AB2-045 E
50/50
2.92.9
933502AC2-165 E
50/50
10.41510.415
958502AF2-144 E
50/50
1.4141.414
3151911BEARGRDN G1
50/50
12.67512.675
3151921BEARGRDN G2
50/50
12.67512.675
923862AB2-026 E
50/50
1.4391.439
938562AE1-075 E
50/50
1.2271.227
3147223TWITTYS
50/50
1.0771.077
936261AD2-033 C
50/50
14.15914.159
936262AD2-033 E
50/50
9.4399.439
934621AD1-088 C
50/50
10.07810.078
934622AD1-088 E
50/50
4.8524.852
3151931BEARGRDN S1
50/50
16.39816.398
316034AC1-036 C
50/50
0.2640.264
316258AE1-075 C
50/50
0.4060.406
316313AB2-026 C
50/50
0.4430.443
316322AB2-045 C
50/50
0.6450.645
316336AC2-165 C
50/50
13.83813.838
316405AF2-144 C
50/50
0.3450.345
927255AC1-221 E
Adder
2.3423529411764711.991
927264AC1-222 E
Adder
3.062.601
932763AC2-100 E
Adder
1.55058823529411781.318
924022AB2-043 E O1
Adder
4.7070588235294134.001
925997AC1-075 E
Adder
1.96235294117647061.668
926024AC1-080 E
Adder
0.65058823529411770.553
962561AG1-105 C
Adder
7.5094117647058836.383
962562AG1-105 E
Adder
5.00588235294117644.255
964241AG1-285 C
Adder
12.3576470588235310.504
964242AG1-285 E
Adder
8.237647058823537.002
934612AD1-087 E
Adder
3.42470588235294132.911
935172AD1-152 E
Adder
4.8023529411764714.082
937482AD2-202 E
Adder
1.00235294117647070.852
938821AE1-108 C
50/50
25.54125.541
938822AE1-108 E
50/50
12.18712.187
942461AE2-259 C
50/50
15.69115.691
942462AE2-259 E
50/50
10.46110.461
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.5951.595
CBM West 1LTFEXP_CBM-W1->PJM
CBM
1.2611.261
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.5633.563
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
25.74725.747
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7270.727
NYPJM->LTFIMP_NY
CLTF
0.3810.381
LGEELTFEXP_LGEE->PJM
CLTF
0.0760.076
WECLTFEXP_WEC->PJM
CLTF
0.0350.035
CPLELTFEXP_CPLE->PJM
CLTF
3.353.35
TVALTFEXP_TVA->PJM
CLTF
1.1431.143
MECLTFEXP_MEC->PJM
CLTF
0.4090.409
LAGNLTFEXP_LAGN->PJM
CLTF
1.4791.479
SIGELTFEXP_SIGE->PJM
CLTF
0.0210.021
O66PJM->LTFIMP_O-066
CMTX_NF
4.6624.662

Details for 8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 511_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 511_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:105.31 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4286.26
MW Contribution:20.19
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961791AG1-021 C
Adder
2.30941176470588251.963
961792AG1-021 E
Adder
1.96705882352941171.672
963041AG1-153 C
50/50
17.10317.103
963042AG1-153 E
50/50
25.65425.654
964791AG1-342 C
50/50
5.7665.766
964792AG1-342 E
50/50
3.8443.844
3138533PONTONDP
Adder
0.85529411764705890.727
3147133PAMPLIN
Adder
1.261.071
3151531CLOVER1
50/50
28.86828.868
3151541CLOVER2
50/50
28.59928.599
3151581KERR 1
50/50
0.5770.577
3151591KERR 2
50/50
1.6151.615
3151601KERR 3
50/50
1.6151.615
3151611KERR 4
50/50
1.6151.615
3151621KERR 5
50/50
1.6151.615
925785AC1-054 E
Adder
2.96470588235294132.52
926274AC1-105 E
50/50
4.6164.616
942751AE2-291 C
Adder
12.11176470588235310.295
942752AE2-291 E
Adder
8.0741176470588246.863
943902AF1-058 E
50/50
2.342.34
959311AF2-222 C
50/50
22.05622.056
959312AF2-222 E
50/50
14.77814.778
24401205PINNACLE
Adder
1.6670588235294121.417
3151631KERR 6
50/50
1.6151.615
3151641KERR 7
50/50
1.6151.615
3152661PLYWOOD A
50/50
2.0932.093
316118AC1-105 C
50/50
1.5721.572
316131AB2-060 C
50/50
2.042.04
924162AB2-060 E OP
50/50
5.8965.896
924302AB2-077 E O1
50/50
1.8631.863
924312AB2-078 E O1
50/50
1.8631.863
924322AB2-079 E O1
50/50
1.8631.863
925612AC1-036 E
50/50
1.1421.142
940081AE1-250 C
Adder
12.86117647058823510.932
940082AE1-250 E
Adder
8.5741176470588247.288
946301AF1-294 C
Adder
4.7458823529411774.034
946302AF1-294 E
Adder
4.01882352941176453.416
957481AF2-042 C
50/50
129.887129.887
957482AF2-042 E
50/50
86.59186.591
958211AF2-115 C
Adder
2.88588235294117632.453
958212AF2-115 E
Adder
2.45882352941176442.09
3151021BRUNSWICKG1
50/50
25.15825.158
3151031BRUNSWICKG2
50/50
25.15825.158
3151041BRUNSWICKG3
50/50
25.15825.158
3151051BRUNSWICKS1
50/50
52.26552.265
3152411Z1-086 GT1
50/50
33.47433.474
3152421Z1-086 GT2
50/50
33.46533.465
3152431Z1-086 GT3
50/50
33.46533.465
3152441Z1-086 ST
50/50
58.26658.266
957601AF2-054 C
Adder
-1.8-1.53
964211AG1-282 C
Adder
-1.7011764705882353-1.446
942001AE2-212 C
Adder
-2.010588235294118-1.709
3147223TWITTYS
50/50
1.2661.266
936261AD2-033 C
50/50
17.43217.432
936262AD2-033 E
50/50
11.62211.622
933291AC2-141 C
Adder
-32.203529411764706-27.373
934621AD1-088 C
50/50
21.36821.368
934622AD1-088 E
50/50
10.28810.288
316003AC1-222 C
50/50
1.7441.744
316034AC1-036 C
50/50
0.3110.311
316222AC1-221 C
50/50
2.6372.637
316237AB2-079 C O1
50/50
0.4550.455
316238AB2-078 C O1
50/50
0.4550.455
316239AB2-077 C O1
50/50
0.4550.455
316240AF1-291 C
Adder
-1.9317647058823528-1.642
316248AF1-058 C
50/50
0.5710.571
316283AC2-100 C
50/50
2.1162.116
927255AC1-221 E
50/50
6.9166.916
927264AC1-222 E
50/50
7.1497.149
932763AC2-100 E
50/50
4.6734.673
313527AB2-043 C
50/50
0.7110.711
924022AB2-043 E O1
50/50
7.1597.159
316123AC1-075 C
50/50
1.3531.353
925997AC1-075 E
50/50
4.7084.708
316205AC1-080 C
50/50
0.4520.452
926024AC1-080 E
50/50
1.5621.562
962561AG1-105 C
50/50
14.10814.108
962562AG1-105 E
50/50
9.4059.405
964241AG1-285 C
50/50
17.07617.076
964242AG1-285 E
50/50
11.38411.384
934611AD1-087 C
50/50
2.842.84
934612AD1-087 E
50/50
8.2238.223
935171AD1-152 C
50/50
2.8492.849
935172AD1-152 E
50/50
11.76211.762
936161AD2-022 C
Adder
12.15882352941176610.335
936162AD2-022 E
Adder
7.29529411764705856.201
936171AD2-023 C
Adder
7.0929411764705886.029
936172AD2-023 E
Adder
3.8505882352941183.273
937481AD2-202 C
50/50
0.8240.824
937482AD2-202 E
50/50
2.4072.407
938531AE1-072 C
Adder
-16.01294117647059-13.611
940641AE2-051 C
Adder
-21.040000000000003-17.884
942461AE2-259 C
Adder
12.19882352941176510.369
942462AE2-259 E
Adder
8.1329411764705886.913
944641AF1-129 C
Adder
-90.49176470588236-76.918
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
9.2639.263
CBM West 1LTFEXP_CBM-W1->PJM
CBM
71.06671.066
CBM West 2LTFEXP_CBM-W2->PJM
CBM
44.76444.764
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
170.641170.641
G-007PJM->LTFIMP_G-007
CMTX_NF
4.6814.681
NYPJM->LTFIMP_NY
CLTF
2.1082.108
LGEELTFEXP_LGEE->PJM
CLTF
2.7422.742
WECLTFEXP_WEC->PJM
CLTF
1.451.45
CPLELTFEXP_CPLE->PJM
CLTF
19.41719.417
TVALTFEXP_TVA->PJM
CLTF
11.71211.712
MECLTFEXP_MEC->PJM
CLTF
8.3488.348
LAGNLTFEXP_LAGN->PJM
CLTF
14.84614.846
SIGELTFEXP_SIGE->PJM
CLTF
0.5240.524
O66PJM->LTFIMP_O-066
CMTX_NF
29.75629.756

Details for AC1-222 TAP-3HUBER DP 115.0 kV Ckt 1 line l/o AEP_P1-2_#5366_42_SRT-A-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AC1-222 TAP-3HUBER DP 115.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#5366_42_SRT-A-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:101.1 %
Rating:285.76 MVA
Rating Type:B
MVA to Mitigate:288.91
MW Contribution:51.57
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
24728405LEESVG
50/50
1.3291.329
3151561HALLBR1
50/50
2.242.24
926646AC1-145 E
50/50
3.7973.797
942671AE2-283 C
50/50
6.2366.236
942672AE2-283 E
50/50
5.5685.568
942751AE2-291 C
50/50
30.9430.94
942752AE2-291 E
50/50
20.62720.627
940081AE1-250 C
50/50
10.17910.179
940082AE1-250 E
50/50
6.7866.786
941801AE2-185 C
50/50
8.0188.018
941802AE2-185 E
50/50
5.3455.345
24684305SMG1
50/50
1.1971.197
24684405SMG2
50/50
3.2973.297
24684505SMG3
50/50
2.0262.026
24684605SMG4
50/50
3.2973.297
24684705SMG5
50/50
1.2521.252
316003AC1-222 C
50/50
5.0075.007
926055AC1-083 E
50/50
8.4158.415
927264AC1-222 E
50/50
20.52320.523
962751AG1-124 C
Adder
3.48588235294117642.963
962752AG1-124 E
Adder
2.43294117647058842.068
316217AC1-145 C
50/50
0.6890.689
270197AC1-083 C
50/50
0.840.84
270173AC1-122 C
50/50
0.890.89
926516AC1-122_E
50/50
2.5722.572
316197AC1-042 C
50/50
0.5790.579
925665AC1-042 E
50/50
5.85.8
316123AC1-075 C
50/50
3.5893.589
925997AC1-075 E
50/50
12.4912.49
316205AC1-080 C
50/50
1.1991.199
926024AC1-080 E
50/50
4.1444.144
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
1.2571.257
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.3476.347
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.451.45
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.2550.255
NYPJM->LTFIMP_NY
CLTF
0.0970.097
LGEELTFEXP_LGEE->PJM
CLTF
0.2620.262
WECLTFEXP_WEC->PJM
CLTF
0.1270.127
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.7150.715
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.2460.246
TVALTFEXP_TVA->PJM
CLTF
0.1930.193
MECLTFEXP_MEC->PJM
CLTF
0.5260.526
LAGNLTFEXP_LAGN->PJM
CLTF
0.1510.151
SIGELTFEXP_SIGE->PJM
CLTF
0.0410.041
O66PJM->LTFIMP_O-066
CMTX_NF
1.6111.611
CONTINGENCY 'AEP_P1-2_#5366_42_SRT-A-1'
 OPEN BRANCH FROM BUS 242549 TO BUS 242632 CKT 1    /*05BANSTR     138.0 - 05EDAN 2     138.0
 OPEN BRANCH FROM BUS 242549 TO BUS 314668 CKT Z1   /*05BANSTR     138.0 - 4BANISTR     138.0
 OPEN BRANCH FROM BUS 242549 TO BUS 940080 CKT 1    /*05BANSTR     138.0 - AE1-250 TP   138.0
END
CONTINGENCY 'DVP_P1-2: LN 556_SRT-S-3'
 OPEN BRANCH FROM BUS 313995 TO BUS 314936 CKT 1                /*8FINNEYWOOD  500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314902 TO BUS 314936 CKT 1 /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
CONTINGENCY 'DVP_P1-2: LN 511_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314936 CKT 1                /*8CARSON      500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
313168 to 314696 ckt 1
313867 to 313707 ckt 1
313373 to 314765 ckt 1
314940 to 941030 ckt 1
316000 to 313168 ckt 1

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Light Load Analysis

The New Service Request AE2-291 was evaluated as a 102.0 MW injection in the Dominion area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

(No impacts were found for this analysis)

Light Load Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

(No impacts were found for this analysis)

Short Circuit Analysis

Based on PJM’s Short Circuit Analysis, this project did not contribute >1% fault duty to previously identified overdutied breakers, nor did it cause any new overdutied breakers.

Stability Analysis

Analysis Complete - No Issues

Executive Summary

New Service Requests (projects) in PJM Transition Cycle 1 Cluster 34 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 34 projects.

 

Table 1: Transition Cycle 1 Cluster 34 Projects

 

 

 

 

 

 

 

Cluster

Project

Fuel Type

Transmission Owner

MFO

(MW)

MWE

(MW)

MWC

(MW)

Point of Interconnection

34

AE1-148

Solar

Dominion

90

90

54

Kerr Dam-Ridge Rd

115 kV

AE2-291

Solar

Dominion

102

102

61.2

Grit DP-Perth 115 kV

AF2-297

Solar

Dominion

80

80

48

Sedge Hill 115 kV

AG1-105

Solar

Dominion

90

90

54

Mount Laurel-Barnes Junction 115 kV

AG1-342

Solar

Dominion

36

36

21.6

Dryburg 115 kV

 

 

This analysis is effectively a screening study to determine whether the addition of the Cluster 34 projects will meet the dynamics requirements of the NERC, Dominion Energy, and PJM reliability standards.

 

The load flow case for Phase 2 was used as a starting point and was updated based on latest Cluster 34 data, recommended transmission changes incorporated based on Dominion Energy Phase 2 feedback, and withdrawn generation removed. Cluster 34 projects have been dispatched online at maximum power output with near unity power factor measured at the high-side of the main substation transformer. The dynamic models for Cluster 34 projects were updated based on the latest DP2 data and include any tuning adjustments recommended during Phase 2.  

 

Cluster 34 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. During the Phase 2 analysis contingencies were examined around the POIs and no violations were observed as a result of Cluster 34 projects interconnecting.  Due to this the Phase 3 analysis for Cluster 34 focused on the contingencies at Chase City that resulted in instability caused by Cluster 31 and Cluster 40 during Phase 2.  The Phase 3 analysis examined 217 sensitivity contingencies, each with a 30 second simulation time period. The studied contingencies included:

 

  • Steady-state operation (30 seconds)
  • Three-phase faults with normal clearing time
  • Single-phase bus faults with normal clearing time
  • Single-phase faults with stuck breaker
  • Single-phase faults with delayed clearing at remote end
  • Three-phase faults with loss of multiple-circuit tower line

 

Instability was observed for contingencies when the Chase City to AG1-285 Tap 115 kV circuit was tripped. This outage resulted in instability due to insufficient export paths for the generation along the Farmville to Chase City 115 kV path through the radial connection.  Additionally, the Farmville to Chase City 115 kV path is prone to controller instability due to weak grid conditions determined by the composite short circuit ratio assessment.  The instability was caused by the Cluster 31 queue projects. 

  

To following mitigation was tested and all maintain stability: 

  1. Adding a new 115 kV line from AG1-285 to Butcher’s Creek. 
  2. Moving AF2-222 and AG1-285 to a new 230 kV line from Farmville to Finneywood. 
  3. Updating the new AG1-285 230 kV substation to breaker and a half scheme to accommodate 2 x 230/115 kV AG1-285 transformers, and a 230 kV line from AG1-285 to Finneywood. 

 

The Transmission Owner selected the 3rd mitigation option, which updated the new AG1-285 230 kV substation to a breaker and a half scheme to accommodate 2 x 230/115 kV AG1-285 transformers, and a 230 kV line from AG1-285 to Finneywood. to maintain stability. This mitigation is required due to the interconnection of the Cluster 31 queue projects. Cluster 34 queue projects did not cause instability.

 

The REGCA1 Accel (CON J+13) parameter was set to 0.7 to improve PSS/E network solution calculations for all IBRs located in dispatch area.

 

Voltage oscillations were observed at Altavista 69 kV. It is determined that Smith Mountain, AEP generator, is the source of this oscillation. Gnetting the Smith Mountain generators improved PSS/E network solution calculations. It is recommended for Smith Mountain dynamic model to be revised.

 

Nearby projects were found to trip based on their protection settings. The protection trip times were increased during Phase 2 analysis and maintained during the Phase 3 analysis:

  • AD2-033 tripped for overvoltage protection model for voltage above 1.4 p.u. and the time delay setting was update from 0.001 to 0.0208 seconds.
  • AE2-185 tripped for overvoltage protection model for voltage above 1.2 p.u. and the time delay setting was update from 0.001 to 0.0542 seconds.
  • AE2-187 tripped for overvoltage protection model for voltage above 1.175 p.u. and the time delay setting was update from 0.21 to 0.4042 seconds.
  • AE2-187 tripped for overvoltage protection model for voltage above 1.2 p.u. and the time delay setting was update from 0.001 to 0.3875 seconds.
  • AE2-283 tripped for underfrequency protection model for frequency below 55 Hz and the time delay settings was updated from 0.01 to 0.0167 seconds.
  • AF2-404 tripped for underfrequency protection model for frequency below 55 Hz and the time delay settings was updated from 0.01 to 0.0167 seconds.  

 

With the mitigation identified above, the results of the contingencies tested on the RTEP 2027 summer peak case found: 

 

  • Cluster 34 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),
  • The system with Cluster 34 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for inter area modes and 4% for local modes in Dominion area.
  • Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds,  except where protective action isolates that bus.
  • For Dominion area, the final voltages are within the steady-state voltage ranges below per Dominion Energy’s transmission planning criteria.
    • P1 Category Contingencies:
      • 0.93 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.93 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.01 to 1.096 p.u. for 500 kV facilities
    • P2, P4, P5, and P7 Category Contingencies:
      • 0.90 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.90 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.00 to 1.096 p.u. for 500 kV facilities
  • No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

It is recommended that future model submissions be validated with the settings proposed in this study. If model data and settings differ, then a transient stability study is recommended to validate the new model data and settings.

 

No mitigation was needed to connect the Cluster 34 queue projects. 

Reactive Power Analysis

The reactive power capability of AE2-291 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AA2-057Hornertown-Whitakers 115kVIn Service
AB1-081Anaconda-Mayo Dunbar 115kVIn Service
AB1-132Thelma 230kVIn Service
AB1-173Brink-Trego 115kVIn Service
AB2-040Brink 115kVIn Service
AB2-043Chase City 115kVIn Service
AB2-045Buckingham 34.5kVIn Service
AB2-059Benson-Dunbar 115kVIn Service
AB2-060Chase City-Lunenburg 115kVIn Service
AB2-077Buggs Island-Chase City 115kVIn Service
AB2-078Buggs Island-Chase City 115kVIn Service
AB2-079Buggs Island-Chase City 115kVIn Service
AB2-174Emporia-Trego 115kVIn Service
AC1-034Heartsease DP - Mayo Dunbar 115kVSuspended
AC1-036Twittys Creek 34.5kVIn Service
AC1-042Altavista-Mt. Airy 69kVIn Service
AC1-054Kerr Dam–Eatons Ferry 115 kVIn Service
AC1-075Perth-Hickory Grove 115kVIn Service
AC1-080Perth-Hickory Grove 115kVIn Service
AC1-083Smith Mountain-Bearskin 138kVIn Service
AC1-086Thelma 230kVSuspended
AC1-098Dawson-South Justice 115kVPartially in Service - Under Construction
AC1-099Dawson-South Justice 115kVPartially in Service - Under Construction
AC1-105Halifax-Mt. Laurel 115kVIn Service
AC1-145Gretna DP 69 kVIn Service
AC1-208Cox-Whitakers 115kVUnder Construction
AC1-221Halifax-Person 230kVIn Service
AC1-222Crystal Hill-Halifax 115kVIn Service
AC2-084Dawson-South Justice 115kVPartially in Service - Under Construction
AC2-100Halifax-Person 230kVIn Service
AC2-165Bremo-Powhatan 230kVSuspended
AD1-056Hornertown-Hathaway 230 kVSuspended
AD1-057Hornertown-Hathaway 230 kVSuspended
AD1-087Clover-Sedge Hill 230 kVIn Service
AD1-088Briery-Clover 230 kVSuspended
AD1-152Clover-Sedge Hill 230 kVIn Service
AD2-022East Danville - Roxborough 230 kVEngineering & Procurement
AD2-023East Danville - Roxborough 230 kVEngineering & Procurement
AD2-033Chase City-Lunenburg 115 kVUnder Construction
AD2-202Clover-Sedge Hill 230kVIn Service
AE1-108Bremo-Scottsville 138 kVEngineering & Procurement
AE1-250Smith Mountain-E. Danville 138 kVEngineering & Procurement
AE2-092Kidds Store-Sherwood 115 kVEngineering & Procurement
AE2-185Gladys DP-Stonemill Switching Station 69 kVActive
AE2-259Curdsville-Willis Mtn 115 kVEngineering & Procurement
AE2-283Gladys-Stone Mill 69 kVActive
AF1-058Welco 34.5 kVIn Service
AF1-292Fields 34.5kVEngineering & Procurement
AF1-294Jetersville-Ponton 115 kVActive
AF2-042Clover-Rawlings 500 kVActive
AF2-115Jetersville-Ponton 115 kVActive
AF2-222Madisonville DP-Twitty's Creek 115 kVActive
AF2-299Fields 34.5 kVActive
AG1-021Jetersville-Ponton 115 kVActive
AG1-105Mount Laurel-Barnes Junction 115 kVActive
AG1-106Thelma 230 kVActive
AG1-285Chase City-Central 115 kVActive
AG1-342Dryburg 115 kVActive
AG1-532Fields 34.5 kVEngineering & Procurement
Z2-044Whitakers 34.5kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In accordance with PJM Tariff Part VII, Subpart D, section 312.A.1.b and as outlined in PJM Manual 14H, Section 13, in Phase III of the Cycle, PJM coordinates with the Affected System Operators to conduct any studies required to determine the impact of the New Service Request on any Affected System and will include the Affected System Study results in Phase III System Impact Study, if available from the Affected System Operator.

If your project required an Affected System Study, the results are shown below from the Affected System Operator.

For more details, please refer to your Affected System Study report by the Affected System Operator. If the Affected System Operator identified the need for a system reinforcement on their system due to their planning criteria, Project Developer must follow the Affected System Operator Tariff for construction of the network upgrade. PJM will list any required network upgrades identified by the Affected System Operator in the PJM Project Developer’s GIA under Schedule F.

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Final System Impact Study analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AE2-291 System Reinforcements:
TORTEP IDTitleCategoryAllocated Cost ($USD)Facilities Study
Dominionn9220.0Wreck and rebuild 15.42 miles of 230 kV Line #298 from Buckingham to Bremo Substations with twin bundled (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor.Cost Allocated$1,705,384
Dominionn9217.0Wreck and rebuild 12.73 miles of 230 kV Line 298 from Buckingham to Farmville Substations with twin bundled (2) 768 ACSS/TW (20/7) "MAUMEE" conductor.Cost Allocated$1,550,409
AEPb4000.211Rebuild 6.5 miles of Johnson Mountain - New London 138 kV lineContingent$0N/A
AEPb4000.210Rebuild 7 miles of Otter - Johnson Mountain 138 kV line.Contingent$0N/A
AEPn5613Rebuild 0.9 miles of the Otter - Alta Vista 138 kV line.Contingent$0N/A
Dominionn8492.2Expand Yadkin Substation to accommodate the new 500 kV line.Non-Contingent$0N/A
Dominionn9259.0Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.Non-Contingent$0N/A
Dominionn9267.0Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.Non-Contingent$0N/A
Dominionn9630.0Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.Non-Contingent$0N/A
Dominionb4000.357Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.Non-Contingent$0N/A
Dominionb4000.352Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.Non-Contingent$0N/A
Dominionb4000.351Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.Non-Contingent$0N/A
Dominionb4000.350Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.Non-Contingent$0N/A
Dominionb4000.349Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.Non-Contingent$0N/A
Dominionb4000.348Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.Non-Contingent$0N/A
Dominionb4000.346Cut-in 500kV line from Kraken substation into Yeat substationNon-Contingent$0N/A
Dominionb4000.345Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.Non-Contingent$0N/A
Dominionb4000.344Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.Non-Contingent$0N/A
Dominionb4000.325Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.Non-Contingent$0N/A
Dominionb4000.326At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.Non-Contingent$0N/A
Dominionb4000.327Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.Non-Contingent$0N/A
Dominions3047.2Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.Non-Contingent$0N/A
Dominionb3800.312Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.Non-Contingent$0N/A
Dominionb3800.313Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.Non-Contingent$0N/A
Dominionb3800.356Build a new 500 kV line from Vint Hill to Wishing Star.Non-Contingent$0N/A
Dominionb3800.357Build a new 500 kV line from Morrisville to Vint Hill.Non-Contingent$0N/A
Dominionb3800.354Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.Non-Contingent$0N/A
Dominionn8492Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.Non-Contingent$0N/A
Dominionn8492.1Two Breaker Additions at Fentress Substation.Non-Contingent$0N/A
Grand Total:$3,255,793

PJM evaluated the impact of topology changing reinforcements to mitigate the impacts driven by New Service Requests. PJM determined which reinforcements were eliminated as a result of modeling the topology changing reinforcements. PJM then grouped the topology changing and eliminated reinforcements by region and computed a discount factor to apply to reinforcements to reduce the cost of all these reinforcements down to the cost of contstructing only the topology changing reinforcements. For additional details, please click the icon below

Regional Topology Upgrade Conversion

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n9220.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9220.0 / TC1-PH2-DOM-033
Title
Wreck and rebuild 15.42 miles of 230 kV Line #298 from Buckingham to Bremo Substations with twin bundled (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor.
Description
Wreck and rebuild 15.42 miles of 230 kV Line #298 from Buckingham to Bremo Substations with twin bundled (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor.
Total Cost ($USD)
$44,465,922
Discounted Total Cost ($USD)
$44,465,922
Allocated Cost ($USD)
$1,705,384
Time Estimate
42 to 48 Months

Contributor

FacilityContingency
6BUCKING-6BREMO 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A796.0 MVA
(All)B796.0 MVA
(All)C964.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AE2-29113.6 MW3.8%$1,705,384
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
17.8 MW5.0%$2,229,393
AF2-042163.5 MW46.2%$20,532,412
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
10.8 MW3.1%$1,359,435
AF2-22265.0 MW18.3%$8,159,120
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
8.7 MW2.4%$1,087,573
AG1-10523.6 MW6.7%$2,967,877
AG1-28541.9 MW11.8%$5,264,576
AG1-3429.2 MW2.6%$1,160,153

System Reinforcement: n9217.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9217.0 / TC1-PH2-DOM-028
Title
Wreck and rebuild 12.73 miles of 230 kV Line 298 from Buckingham to Farmville Substations with twin bundled (2) 768 ACSS/TW (20/7) "MAUMEE" conductor.
Description
Wreck and rebuild 12.73 miles of 230 kV Line 298 from Buckingham to Farmville Substations with twin bundled (2) 768 ACSS/TW (20/7) "MAUMEE" conductor.
Total Cost ($USD)
$40,414,822
Discounted Total Cost ($USD)
$40,414,822
Allocated Cost ($USD)
$1,550,409
Time Estimate
45 to 46 Months

Contributor

FacilityContingency
6BUCKING-6FARMVIL 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A797.0 MVA
(All)B797.0 MVA
(All)C1116.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AE2-29113.6 MW3.8%$1,550,409
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
17.8 MW5.0%$2,026,247
AF2-042163.5 MW46.2%$18,661,737
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
10.8 MW3.1%$1,235,466
AF2-22265.0 MW18.3%$7,415,536
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021
8.7 MW2.4%$988,419
AG1-10523.6 MW6.7%$2,697,555
AG1-28541.9 MW11.8%$4,784,850
AG1-3429.2 MW2.6%$1,054,602

System Reinforcement: b4000.211
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b4000.211
Title
Rebuild 6.5 miles of Johnson Mountain - New London 138 kV line
Description
Rebuild 6.5 miles of Johnson Mountain - New London 138 kV line Projected In Service Date: 06/01/2029
Cost Information
Time Estimate
Jun 01 2029

Contingent

Note: Although AE2-291 may not presently have cost responsibility for this upgrade, AE2-291 may need this upgrade in-service to be deliverable to the PJM system. If AE2-291 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
05JOHNMT-05NEWLDN 138.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A297.0 MVA
(All)B330.0 MVA

System Reinforcement: b4000.210
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b4000.210
Title
Rebuild 7 miles of Otter - Johnson Mountain 138 kV line.
Description
Rebuild 7 miles of Otter - Johnson Mountain 138 kV line.
Cost Information
Time Estimate
Jun 01 2029

Contingent

Note: Although AE2-291 may not presently have cost responsibility for this upgrade, AE2-291 may need this upgrade in-service to be deliverable to the PJM system. If AE2-291 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
05JOHNMT-05OTTER 138.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A297.0 MVA
(All)B414.0 MVA

System Reinforcement: n5613
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n5613 / AEPA0014a
Title
Rebuild 0.9 miles of the Otter - Alta Vista 138 kV line.
Description
Rebuild 0.9 miles of the Otter - Alta Vista 138 kV line.
Total Cost ($USD)
$2,740,849
Discounted Total Cost ($USD)
$2,740,849
Allocated Cost ($USD)
$0
Time Estimate
Nov 21 2027

Contingent

Note: Based on PJM cost allocation criteria, AE2-291 does not receive cost allocation towards this upgrade which has been securitized by a prior Queue/Cycle. Although AE2-291 may not have cost responsibility for this upgrade, AE2-291 may need this upgrade in-service to be deliverable for the reliability to the PJM system. If AE2-291 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
05OTTER-4ALTVSTA 138.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A257.0 MVA
(All)B360.0 MVA

System Reinforcement
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
(Pending)
Title
Most limiting rating on the Dominion side is the Wave Trap and Lead at Altavista: 363 / 382 /420 MVA.
Description
Most limiting rating on the Dominion side is the Wave Trap and Lead at Altavista: 363 / 382 /420 MVA.
Total Cost ($USD)
$0
Discounted Total Cost ($USD)
$0
Allocated Cost ($USD)
$0
Time Estimate
99 Months

Note: This reinforcement is fictitious and will not be cost allocated to projects. It is listed for information purposes only.

FacilityContingency
05OTTER-4ALTVSTA 138.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A363.0 MVA
(All)B382.0 MVA
(All)C420.0 MVA

System Reinforcement: n9138.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9138.0 / TC1-PH1-DOM-070
Title
ELIM TC1: Wreck and rebuild 22.59 miles of Line #511 between Carson and Rawlings Substations with three (3) 1351 ACSS/TW and associated substation work.
Description
Wreck and rebuild 22.59 miles of Line 511 between Carson and Rawlings with three (3) 1351 ACSS/TW and associated substation work.
Total Cost ($USD)
$111,130,292
Discounted Total Cost ($USD)
$111,130,292
Allocated Cost ($USD)
$0
Time Estimate
60 to 61 Months

Potential Aggregate ContributorEliminated

Note 1: Based on PJM cost allocation criteria, AE2-291 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AE2-291 could receive cost allocation. Although AE2-291 may not presently have cost responsibility for this upgrade, AE2-291 is a potential Aggregate Pool Contributor.

Note 2: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle.

FacilityContingency
8CARSON-8RAWLINGS 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-C
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-A
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 51192_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 51172_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 511T544_SRT-S
No new ratings for this Flowgate.
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-C
No new ratings for this Flowgate.
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-A
No new ratings for this Flowgate.
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
No new ratings for this Flowgate.

System Reinforcement: n9250.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9250.0 / TC1-PH2-DOM-044
Title
ELIM TC1: Construct a new 22.59 mile line between Carson and Rawlings Substations.
Description
Construct a new 22.59 mile line between Carson and Rawlings Substations.
Total Cost ($USD)
$108,728,086
Discounted Total Cost ($USD)
$108,728,086
Allocated Cost ($USD)
$0
Time Estimate
60 to 61 Months

Potential Aggregate ContributorEliminated

Note 1: Based on PJM cost allocation criteria, AE2-291 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AE2-291 could receive cost allocation. Although AE2-291 may not presently have cost responsibility for this upgrade, AE2-291 is a potential Aggregate Pool Contributor.

Note 2: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle.

FacilityContingency
8CARSON-8RAWLINGS 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-C
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-A
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 51192_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 51172_SRT-S
No new ratings for this Flowgate.
8CARSON-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P4-2: 511T544_SRT-S
No new ratings for this Flowgate.
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-C
No new ratings for this Flowgate.
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S-A
No new ratings for this Flowgate.
8ROGERS RD-AE2-094 TP 500.0 kV Ckt 1 lineDVP_P1-2: LN 511_SRT-S
No new ratings for this Flowgate.

System Reinforcement: n8492.2

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n8492.2
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.2
Title
Expand Yadkin Substation to accommodate the new 500 kV line.
Description
Expansion of yadkins 500 kV switchyard to accommodate the new 500 kV line which includes addition of 5000 amp GIS breakers and relocation of the existing suffolk -yadkin 500 kV line#565
Total Cost ($USD)
$16,207,123
Allocated Cost ($USD)
$0
Time Estimate
15 to 16 Months
Cost Alloc Type
Non-Contingent

System Reinforcement: n9259.0

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9259.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9259.0
Title
Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.
Description
Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.
Total Cost ($USD)
$25,304,902
Allocated Cost ($USD)
$0
Time Estimate
38 to 39 Months
Cost Alloc Type
Non-Contingent

System Reinforcement: n9267.0

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9267.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9267.0 / TC1-PH2-DOM-067
Title
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.
Description
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner substations with single (1) 768.2 ACSS/TW “Maumee” at 250 degrees C. This new line will be on separate transmission towers from the existing Northern Neck and Moon Corner line 1059. Station expansion is required at Northern Neck and Moon Corner to accommodate the new line.
Total Cost ($USD)
$45,730,074
Allocated Cost ($USD)
$0
Time Estimate
45 to 46 Months
Cost Alloc Type
Non-Contingent

System Reinforcement: n9630.0

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9630.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9630.0 / TC1-PH3-DOM-013
Title
Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.
Description
n9630.0 addresses both stability and load flow violations. Construct a new 230 kV Line from the AG1-285 substation to the 230 kV Finneywood substation following the Line 1012 ROW for approximately 1.0 miles, then following the Line 556 ROW for approximately 3.5 miles to terminate at Finneywood. Expand the AG1-285 115 kV substation to accommodate two (2) new 115/230 kV transformers. Build a 230 kV substation at AG1-285 to connect the 115/230 kV transformers and the new 230 kV line to Finneywood. Expand the Finneywood 230 kV substation to accommodate the new line. The existing 1.0 miles of 115 kV from AG1-285 to Chase City does not need to be rebuilt to accommodate a new structure in the same right of way and therefore will be unchanged. The existing 3.5 miles of 500 kV towers from Structure 556/46 to Finneywood substation will need to be rebuilt as a double circuit tower to accommodate the new 230 kV line.
Total Cost ($USD)
$71,697,833
Allocated Cost ($USD)
$0
Time Estimate
Dec 31 2029
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.357

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.357
Title
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Description
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.352

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.352
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.352
Title
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.
Description
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.351

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.351
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.351
Title
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.
Description
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.350

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.350
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.350
Title
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.
Description
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.349

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.349
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.349
Title
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.
Description
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.348

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.348
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.348
Title
Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.
Description
Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. A new redundant breaker ring will be added at Kraken to accommodate the new 500kV line from North Anna to Kraken.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.346

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.346
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.346
Title
Cut-in 500kV line from Kraken substation into Yeat substation
Description
Cut-in 500kV line from Kraken substation into Yeat substation
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.345

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.345
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.345
Title
Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.344

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.344
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.344
Title
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.325

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.325
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.325
Title
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Description
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.326

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.326
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.326
Title
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Description
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b4000.327

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.327
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.327
Title
Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.
Description
Upgrade/install equipment at Ladysmith substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230kV strings of breaker and a half scheme.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: s3047.2

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: s3047.2
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
s3047.2
Title
Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.
Description
Install (2) 1400 MVA 500-230 kV transformers and associated 500 kV and 230 kV equipment (breakers, switches, leads) at Vint Hill Substation to supply the area with a 500 kV source Cut and loop 500 kV line #535 Loudoun – Meadowbrook and #569 Loudoun - Morrisville as the 500 kV sources into the proposed 500 kV ring bus Vint Hill Substation will be expanded to the north of the existing site to accommodate the 500 kV ring required for the addition of the new transformers Existing terminations for 230 kV line #2174 Wheeler – Vint Hill, line #2101 Bristers – Vint Hill, and line #2163 Liberty – Vint Hill will be rearranged to terminate into the expanded Vint Hill Substation 230 kV line #2114 Remington CT – Rollins Ford will also be cut and looped into the expanded Vint Hill Substation due to spatial constraints along the existing right-of-way.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.312

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.312
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.312
Title
Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.
Description
Rebuild 500kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way. New conductor to have a summer rating of 4357 MVA.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.313

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.313
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.313
Title
Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.
Description
Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.356

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.356
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.356
Title
Build a new 500 kV line from Vint Hill to Wishing Star.
Description
Build a new 500kV line from Vint Hill to Wishing Star. The line will be supported on single circuit monopoles. New conductor to have a summer rating of 4357 MVA. Line length is approximately 16.59 miles
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.357

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.357
Title
Build a new 500 kV line from Morrisville to Vint Hill.
Description
Build a new 500kV line from Morrisville to Vint Hill. New conductor to have a summer rating of 4357 MVA. Line length is approximately 19.71 miles.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: b3800.354

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.354
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.354
Title
Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.
Description
Install terminal equipment at Wishing Star substation to support a 5000A line to Vint Hill. Update relay settings for 500kV Lines #546 and #590.
Cost Information
Cost Alloc Type
Non-Contingent

System Reinforcement: n8492

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n8492
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492
Title
Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.
Description
Wreck and rebuild one (1) overhead 500kV transmission line that will start at the existing Fentress 500 kV Substation and terminate at the existing Yadkin 500 kV Substation, located approximately 13.5 miles away.
Total Cost ($USD)
$80,172,278
Allocated Cost ($USD)
$0
Time Estimate
26 to 27 Months
Cost Alloc Type
Non-Contingent

System Reinforcement: n8492.1

AE2-291 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n8492.1
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.1
Title
Two Breaker Additions at Fentress Substation.
Description
Install Two 5000 amp GIS Breakers at Fentress Substation to connect the new 500 kV line 5005.
Total Cost ($USD)
$19,945,879
Allocated Cost ($USD)
$0
Time Estimate
30 to 36 Months
Cost Alloc Type
Non-Contingent

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AE2-291


AE2-291 Contributions into Topology or Eliminated Reinforcements:
TypeTORTEP ID / TO IDTitleTopo or ElimMW ImpactPercent AllocationCategoryAllocated Cost ($USD)
Contributions into Topology or Eliminated Reinforcement Total:$0
AE2-291 Contingent Region Topology Upgrades:
TORTEP IDTitleCategoryAllocated Cost ($USD)
Dominionn8492.2Expand Yadkin Substation to accommodate the new 500 kV line.Non-Contingent$0
Dominionn9259.0Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.Non-Contingent$0
Dominionn9267.0Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.Non-Contingent$0
Dominionn9630.0Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.Non-Contingent$0
Dominionb4000.357Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.Non-Contingent$0
Dominionb4000.352Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.Non-Contingent$0
Dominionb4000.351Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.Non-Contingent$0
Dominionb4000.350Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.Non-Contingent$0
Dominionb4000.349Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.Non-Contingent$0
Dominionb4000.348Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.Non-Contingent$0
Dominionb4000.346Cut-in 500kV line from Kraken substation into Yeat substationNon-Contingent$0
Dominionb4000.345Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.Non-Contingent$0
Dominionb4000.344Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.Non-Contingent$0
Dominionb4000.325Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.Non-Contingent$0
Dominionb4000.326At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.Non-Contingent$0
Dominionb4000.327Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.Non-Contingent$0
Dominions3047.2Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.Non-Contingent$0
Dominionb3800.312Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.Non-Contingent$0
Dominionb3800.313Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.Non-Contingent$0
Dominionb3800.356Build a new 500 kV line from Vint Hill to Wishing Star.Non-Contingent$0
Dominionb3800.357Build a new 500 kV line from Morrisville to Vint Hill.Non-Contingent$0
Dominionb3800.354Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.Non-Contingent$0
Dominionn8492Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.Non-Contingent$0
Dominionn8492.1Two Breaker Additions at Fentress Substation.Non-Contingent$0
Region Topology Upgrade Total:$0

Attachments

AE2-291 One Line Diagram

AE2-291 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.