AF2-120 Final System Impact Study (Retool 2) Report

v2.00 released 2026-05-14 11:52

Garner-Northern Neck 115 kV

37.2 MW Capacity / 62.0 MW Energy

Introduction

This Final System Impact Study (SIS) Report has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 314 for New Service Requests (projects) in Transition Cycle 1 (TC1). The Project Developer/Eligible Customer (developer) is Virginia Electric and Power Company (d/b/a Dominion Energy Virginia), and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Virginia Electric and Power Company (d/b/a Dominion Energy Virginia).

Preface

The Final System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Final System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 5, Final Agreement Negotiation Phase, the purpose of the Final Agreement Negotiation Phase is to:

  1. Negotiate, execute and enter into the applicable final interconnection related service agreement found in Tariff, Part IX;
  2. Conduct any remaining analyses or updated analyses based on New Service Requests withdrawn during Decision Point III (DP3); and
  3. Adjust the security obligation based on New Service Requests withdrawn during Decision Point III and/or during the Final Agreement Negotiation Phase.
Retool 1:

In accordance with PJM Tariff Part VII.D 314 B(1)(a), Final Agreement Negotiation Phase:

  • PJM will perform a retool (Retool 1) after the conclusion of DP3 considering only the projects moving on in the Final Agreement Negotiation Phase (Removes DP3 withdrawals).
  • The Final System Impact Study reflecting results from the retooled analysis (Retool 1) will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • PJM will provide updated final electronic agreements to Project Developers and Eligible Customers in the Cycle reflecting updates from the Final System Impact Study after Retool 1 including the adjusted Security requirements.

The AF2-120 Final System Impact Study (Retool 1) Report is available for download here.

Retool 2 (if needed):

If particular New Service Requests do not sign their final agreements after receiving the updated information after Retool 1, there may be the need to run a second retool (Retool 2) to identify if any network upgrades are no longer necessary:

  • PJM will perform Retool 2 (if necessary) considering only the removal of projects from the model which chose not to execute their agreements after Retool 1.
  • The updated Final System Impact Study reflecting results from Retool 2 will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • If there are any adjustments to the agreements required after Retool 2, the necessary network upgrade or Security changes will be handled via the scope change process post-GIA.

General

The Project Developer has proposed a Solar generating facility located in the Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) zone — Richmond County, Virginia. The installed facilities will have a total capability of 62.0 MW with 37.2 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AF2-120
Project Name:
Garner-Northern Neck 115 kV
Project Developer Name:
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
State:
Virginia
County:
Richmond
Transmission Owner:
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
MFO:
62.0
MWE:
62.0
MWC:
37.2
Fuel Type:
Solar
Basecase Study Year:
2027

Physical Interconnection Facility Study

Received

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AF2-120 will interconnect on the Dominion transmission system via a direct connection to the new substation constructed for the AE1-155 project (Moon Corner) located between Garner and Northern Neck 115 kV substations, sharing interconnection facilities with AG1-536.

 

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. The Facilities Studies for the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades were performed by the Transmission Owner in Phase II. Facilities Studies are available for download on PJM.com (see General Section for document links). The Interconnected Transmission Owner has performed a Facilities Study for the required System Reliability Network Upgrades in Phase III (see System Reinforcement Section for document links).

Based on the Final SIS results, the AF2-120 project has the following allocation of costs for interconnection. The Security amount required after the Final SIS and revised agreements is also shown below.

Cost Summary
DescriptionCost Allocated to AF2-120Cost Subject to Security*
Transmission Owner Interconnection Facilities (TOIF)$1,219,290$1,219,290
Other Scope$0$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0
Network Upgrades$1,219,184$1,219,184
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$24,958,287$24,958,287
Transient Stability$3,965,684$3,965,684
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violations$0$0
AFS - Non-PJM Violations$0 **$0 **
Total$31,362,445$31,362,445

* Contributes to calculation for Security. See Security Requirement Section of this report for additional detail.

** This value reflects the results at the time of the report posting and it is subject to change. AFS – Non-PJM Violations are not subject to Security. For latest AFS – Non-PJM Violations, please refer to the latest Affected System Study Report for your project.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Security Requirement

Per Tariff Part VII, Subpart D, section 314 (Final Agreement Negotiation Phase) A.1 and PJM Manual 14H, Section 5, if a Transition Cycle 1 New Service Request is withdrawn during Decision Point III and/or the Final Agreement Negotiation Phase, PJM shall remove the New Service Request from the Cycle and adjust the Security obligations of other New Service Requests based on the withdrawal. The Final System Impact Study results will reflect the updated Security amount for this project. Security may be in the form of cash, letter of credit, or other form of Security acceptable to PJM (see PJM M14H, Section 6.4).

Security is calculated for a New Service Request based on the Network Upgrade costs allocated pursuant to the Final System Impact Study results.

Note 1: "Network Upgrades" referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Security Due for AF2-120/AG1-536

Security has been calculated for the AF2-120/AG1-536 project(s) based on the Final System Impact Study results and is shown in the table below. This Security must be provided at Final SIS through either a wire transfer or letter of credit or other form of Security deemed acceptable by PJM per Manual 14H, Section 6.4.

Security Due for AF2-120/AG1-536
Project(s): AF2-120/AG1-536
Final Agreement Security (A): $63,989,297
Portion of Costs Already Paid (B): $3,055,600
Revised Net Security (C): A B = $60,933,697
Security on Hand with PJM (D): $59,437,216
Additional Security Due at Agreement Execution (E): C D = $1,496,481
Note:

In accordance with Tariff, Part VII, Subpart D, section 314(B)(4)(a) (Final Agreement Negotiation Phase) failure to provide any required adjustments to Security within the 15 Business Day period will result in the New Service Request project being terminated and withdrawn.

Please see the cover letter for more details on Letter of Credit/Wire details to satisfy the additional Security requirement.

If no additional Security is required, please coordinate with your assigned Project Manager to initiate any refunds of Security reductions.

Transmission Owner Scope of Work

The New Service Request Project will interconnect with the Dominion transmission system via a direct connect to the Moon Corner Substation along the Garner-Northern Neck 115 kV Line. The required work for the interconnection of the New Service Request Project to the Dominion Transmission System is detailed in the following tables.

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Scope
Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
n8218

Expansion of Existing Moon Corner Substation

$1,400,804$846,686$120,017$70,861$2,438,368$1,219,184 (See Note 1)
Transmission Owner Interconnection Facilities
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

The installation of two new backbone structures and line conductor at the existing Moon Corner Substation.

$1,757,687$475,788$168,899$36,205$2,438,579$1,219,290 (See Note 1)

Based on the scope of work for the Interconnection Facilities, it is expected to take 43 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase II of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.

 

Transmission Owner Analysis

PJM performed a power flow analysis of the transmission system using a 2027 load flow model and the results were verified by Dominion.

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. Dominion interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AF2-120 was evaluated as a 62.0 MW (37.2 MW Capacity) injection in the Dominion area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1DVP
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer
DVP_P1-3: 6NORNECK-TX#4_SRT-A
SingleAC104.41 %177.38B185.2123.95
GD1DVP
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
DVP_P4-2: H2T557_SRT-S
BreakerAC132.13 %1065.0C1407.2110.04
GD1DVP
6LADYSMITH-8LADYSMITH 230.0/500.0 kV Ckt 1 transformer
DVP_P4-2: H2T574_SRT-S_SENS
BreakerAC134.99 %1031.0C1391.737.89
GD1DVP
AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line
DVP_P4-1: G_SRT-A
BreakerAC131.48 %249.0C327.3939.66

Details for 3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer l/o DVP_P1-3: 6NORNECK-TX#4_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer
Contingency Name:
DVP_P1-3: 6NORNECK-TX#4_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:104.41 %
Rating:177.38 MVA
Rating Type:B
MVA to Mitigate:185.21
MW Contribution:23.95
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer
Contingency Name:
DVP_P1-3: 6NORNECK-TX#4_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:97.53 %
Rating:177.38 MVA
Rating Type:B
MVA to Mitigate:172.99
MW Contribution:21.84
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
80/20
2.8872.887
316059AD1-063 C
80/20
0.1060.106
957831AF2-077 C
80/20
0.1570.157
963611AG1-210 C
80/20
2.9722.972
939601AE1-190 C
80/20
0.2530.253
961951AG1-038 C
80/20
10.05410.054
316077AC2-138 C
80/20
1.0191.019
3150351NORNECKC2
80/20
2.9142.914
940551AE2-041 C
80/20
2.8872.887
316156AD2-030 C
80/20
0.3580.358
966661AG1-536 C
80/20
20.60720.607
943741AF1-042 C
80/20
9.0979.097
962861AG1-135 C
80/20
22.23822.238
316280AD1-041 C
80/20
0.6470.647
939611AE1-191 C
80/20
1.0221.022
936591AD2-074 C
80/20
17.38517.385
316201AC1-065 C
80/20
0.9660.966
3141843SHACKLE
80/20
0.3150.315
957601AF2-054 C
80/20
1.9971.997
958261AF2-120 C
80/20
23.95523.955
316404AE1-155 C
80/20
8.1268.126
3150341NORNECKC1
80/20
3.0233.023
NYPJM->LTFIMP_NY
CLTF
0.0570.057
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0270.027
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0210.021
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0660.066
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0370.037
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.4760.476
CPLELTFEXP_CPLE->PJM
CLTF
0.0770.077
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0340.034
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0770.077
MDUPJM->LTFIMP_MDU
CLTF
0.0030.003

Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H2T557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
Contingency Name:
DVP_P4-2: H2T557_SRT-S
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:132.13 %
Rating:1065.0 MVA
Rating Type:C
MVA to Mitigate:1407.21
MW Contribution:10.04
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
Contingency Name:
DVP_P4-2: H2T557_SRT-S
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:167.15 %
Rating:1065.0 MVA
Rating Type:C
MVA to Mitigate:1780.14
MW Contribution:11.41
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
926785AC1-164_E
Adder
19.72000000000000216.762
943471AF1-018 C
Adder
7.1435294117647066.072
316084AB2-161 E
Adder
4.9517647058823524.209
3145946PLYMOUTH TP
Adder
0.234117647058823540.199
933982AD1-022 E
Adder
3.4235294117647062.91
940641AE2-051 C
Adder
10.9988235294117669.349
926472AC1-118 E
Adder
0.95294117647058830.81
3150701DARBY 4
50/50
3.2783.278
3150731STONECA
Adder
7.29647058823529456.202
935161AD1-151 C
Adder
16.05058823529411813.643
932046AC2-012 E
Adder
10.5517647058823528.969
958161AF2-110 C
Adder
1.09647058823529430.932
938531AE1-072 C
Adder
13.81411764705882611.742
3145393UNCAMP
Adder
4.6082352941176473.917
933981AD1-022 C
Adder
6.2894117647058835.346
900672V4-068 E
Adder
0.25294117647058820.215
315051AA1-145 CT1
50/50
6.5696.569
927041AC1-191 C
50/50
14.27914.279
3142366NRTHEST
50/50
0.2420.242
3138116ELKO L286
Adder
1.61294117647058831.371
961611AG1-000B C
Adder
14.80117647058823512.581
940541AE2-040 C
Adder
2.13058823529411741.811
940482AE2-033 E
Adder
8.0388235294117656.833
940481AE2-033 C
Adder
11.9247058823529410.136
923263AB1-132 E OP
Adder
4.1247058823529413.506
963611AG1-210 C
Adder
0.63764705882352950.542
3150431FOUR RIVERA
50/50
4.1244.124
925865AC1-065 E
Adder
16.6414.144
961951AG1-038 C
Adder
3.1117647058823532.645
961952AG1-038 E
Adder
4.297647058823533.653
946282AF1-292 E
Adder
0.69294117647058820.589
936582AD2-073 E
Adder
0.99294117647058820.844
939262AE1-157 E
Adder
5.2788235294117654.487
930122AB1-027 E
50/50
1.8591.859
316169AC1-164 GEN
Adder
43.8917647058823537.308
316349AD2-085 C
Adder
2.8882352941176472.455
935112AD1-144 E
Adder
0.77529411764705890.659
944582AF1-123 E
Adder
82.2352941176470769.9
944592AF1-124 E
Adder
82.532941176470670.153
923832AB2-022 E
Adder
0.96823529411764710.823
938772AE1-103 E
Adder
3.09647058823529432.632
916042Z1-036 E
Adder
21.6647058823529418.415
960082AF2-299 E
Adder
0.83647058823529410.711
946281AF1-292 C
Adder
1.03882352941176470.883
926071AC1-086 C
Adder
14.17176470588235312.046
957971AF2-091 C
Adder
1.66117647058823531.412
939261AE1-157 C
Adder
9.7317647058823548.272
966882AG1-559 E
Adder
1.02588235294117650.872
966872AG1-558 E
50/50
1.7921.792
966871AG1-558 C
50/50
3.5563.556
316076AC2-137 E
Adder
1.54705882352941181.315
3150831SPRUNCA
Adder
10.1282352941176488.609
3150841SPRUNCB
Adder
10.1282352941176488.609
923842AB2-024 E
Adder
1.81529411764705871.543
316157AD2-030 E
Adder
1.1635294117647060.989
926662AC1-147 E
Adder
1.06705882352941180.907
916192Z1-068 E
Adder
1.50117647058823531.276
957492AF2-043 E
Adder
1.12941176470588230.96
923852AB2-025 E
Adder
0.86235294117647050.733
939412AE1-173 E
Adder
40.66352941176470634.564
964211AG1-282 C
Adder
1.95411764705882351.661
961941AG1-037 C
Adder
0.352941176470588260.3
961942AG1-037 E
Adder
0.235294117647058850.2
941032AE2-094 E
Adder
10.4941176470588248.92
941031AE2-094 C
Adder
23.43176470588235519.917
3150481FOUR RIVERF
50/50
4.9634.963
927042AC1-191 E
50/50
7.1137.113
3150691DARBY 3
50/50
3.2743.274
935162AD1-151 E
Adder
10.7000000000000019.095
316233AE1-074 C
Adder
2.40235294117647062.042
940551AE2-041 C
Adder
7.1435294117647066.072
957832AF2-077 E
Adder
1.33764705882352941.137
943461AF1-017 C
Adder
1.13294117647058810.963
932596AC2-079 E
Adder
7.8070588235294126.636
316311AC2-079 C
Adder
4.7847058823529424.067
938532AE1-072 E
Adder
7.2011764705882366.121
3146326AYDLETT TAP
Adder
1.06588235294117650.906
917122Z2-027 E
Adder
1.04588235294117650.889
920692AA2-178 E
Adder
3.0352941176470592.58
966622AG1-532 E
Adder
0.62705882352941180.533
3150601CHESTF5
Adder
70.6552941176470660.057
925332AB2-190 E
Adder
8.1470588235294116.925
927226AC1-216 E
Adder
7.5517647058823536.419
962962AG1-145 E
Adder
1.38941176470588231.181
936666AD2-085 E
Adder
4.7117647058823534.005
941591AE2-156 C
Adder
14.40941176470588112.248
944601AF1-125 C
Adder
35.35882352941176530.055
944591AF1-124 C
Adder
36.0430.634
938771AE1-103 C
Adder
2.24235294117647041.906
3145413WATKINS
Adder
0.51529411764705880.438
964212AG1-282 E
Adder
1.30235294117647071.107
960081AF2-299 C
Adder
1.2552941176470591.067
926072AC1-086 E
Adder
6.4505882352941175.483
944011AF1-069 C
Adder
7.0176470588235295.965
966881AG1-559 C
Adder
2.03647058823529431.731
316312AB1-027 C
50/50
0.7090.709
944631AF1-128 C
Adder
44.20941176470588437.578
938552AE1-074 E
Adder
1.21058823529411751.029
316160AE1-175 E
Adder
1.14588235294117660.974
3150921YORKTN3
Adder
107.5905882352941291.452
934782AD1-105 E
50/50
6.4256.425
3145256KINGFORK
Adder
0.83411764705882350.709
925522AC1-027 E
Adder
0.97294117647058820.827
926755AC1-161 E
Adder
10.1388235294117658.618
933291AC2-141 C
Adder
23.7529411764705920.19
941102AE2-104 E
Adder
4.2741176470588243.633
957872AF2-081 E
Adder
3.3717647058823532.866
936592AD2-074 E
Adder
8.7800000000000017.463
3150671DARBY 1
50/50
3.2593.259
940432AE2-027 E
Adder
9.0447058823529417.688
934012AD1-025 E
Adder
9.777647058823538.311
939612AE1-191 E
Adder
5.6423529411764714.796
957602AF2-054 E
Adder
1.38235294117647081.175
913392Y1-086 E
Adder
1.71647058823529421.459
939411AE1-173 C
Adder
60.99529411764705651.846
958262AF2-120 E
Adder
4.0152941176470593.413
966661AG1-536 C
Adder
5.184.403
316078AC2-138 E
Adder
0.89294117647058820.759
944491AF1-114 C
Adder
4.88705882352941154.154
315052AA1-145 CT2
50/50
6.5666.566
3150471FOUR RIVERE
50/50
4.0644.064
3142296MT RD221
50/50
0.1860.186
316004AC1-112 C
50/50
0.4420.442
942001AE2-212 C
Adder
2.1905882352941181.862
939192AE1-149 E
Adder
6.6870588235294125.684
939312AE1-162 E
Adder
1.24705882352941181.06
934065AD1-033 E
Adder
3.9752941176470593.379
937226AE2-253 E
Adder
4.6070588235294123.916
943741AF1-042 C
Adder
2.81529411764705852.393
934501AD1-074 C
Adder
24.36705882352941220.712
962861AG1-135 C
Adder
5.8517647058823544.974
924517AB2-100 E2
Adder
2.0282352941176471.724
3141813NORNECK
Adder
0.84941176470588230.722
3150451FOUR RIVERC
50/50
5.0385.038
944641AF1-129 C
Adder
111.9952941176470695.196
316240AF1-291 C
Adder
2.32117647058823541.973
3150501FOURRIVERG
50/50
6.2856.285
924814AB2-134 E
Adder
12.37058823529411810.515
942342AE2-247 E
Adder
1.7282352941176471.469
919152AA1-139 E1
Adder
3.21764705882352952.735
920042AA2-088 E OP
Adder
7.6305882352941186.486
934511AD1-075 C
Adder
6.0917647058823535.178
934521AD1-076 C
Adder
8.8494117647058837.522
939246AE1-155 E
Adder
8.3858823529411777.128
3145723EMPORIA
Adder
0.289411764705882370.246
923573AB1-173 E OP
Adder
2.1847058823529411.857
957972AF2-091 E
Adder
2.29411764705882341.95
3150441FOUR RIVERB
50/50
4.1244.124
3150651CHESTF6
Adder
20.39176470588235217.333
946262AF1-291 E
Adder
1.54705882352941181.315
3130536PAPERMILL
Adder
6.6941176470588245.69
939602AE1-190 E
Adder
1.41058823529411771.199
934576AD1-082 E
Adder
3.94470588235294173.353
933292AC2-141 E
Adder
10.1388235294117658.618
944602AF1-125 E
Adder
80.9447058823529368.803
3145506HICKORY
Adder
1.7235294117647061.465
943612AF1-032 E
Adder
0.73411764705882350.624
957871AF2-081 C
Adder
7.8682352941176476.688
936591AD2-074 C
Adder
5.3811764705882354.574
940492AE2-034 E
Adder
2.2764705882352941.935
934522AD1-076 E
Adder
4.5105882352941183.834
943172AE2-346 E
Adder
0.42235294117647060.359
918492AA1-063AE OP
Adder
2.78000000000000022.363
926412AC1-112 E
50/50
1.5121.512
3150681DARBY 2
50/50
3.2633.263
934781AD1-105 C
50/50
1.5491.549
942341AE2-247 C
Adder
1.25176470588235311.064
943462AF1-017 E
Adder
1.8482352941176471.571
958162AF2-110 E
Adder
1.74470588235294131.483
919153AA1-139 E2
Adder
3.21764705882352952.735
934512AD1-075 E
Adder
3.10117647058823562.636
934502AD1-074 E
Adder
12.40352941176470510.543
924516AB2-100 E1
Adder
2.0282352941176471.724
918512AA1-065 E OP
Adder
3.88823529411764753.305
940642AE2-051 E
Adder
7.3317647058823536.232
966621AG1-532 C
Adder
0.94117647058823540.8
963612AG1-210 E
Adder
0.95647058823529410.813
3150461FOUR RIVERD
50/50
4.0644.064
940431AE2-027 C
Adder
13.56705882352941311.532
942002AE2-212 E
Adder
1.46000000000000021.241
934392AD1-063 E
Adder
1.0717647058823530.911
944581AF1-123 C
Adder
35.91176470588235530.525
941101AE2-104 C
Adder
2.68823529411764732.285
943742AF1-042 E
Adder
4.5941176470588233.905
962862AG1-135 E
Adder
3.9011764705882353.316
966662AG1-536 E
Adder
6.9611764705882355.917
316141AB2-099 E
Adder
0.176470588235294130.15
316088AB2-174 E
Adder
4.3517647058823533.699
923994AB2-040_E
Adder
4.0952941176470593.481
944492AF1-114 E
Adder
6.7482352941176475.736
939191AE1-149 C
Adder
10.0305882352941188.526
3143316POE
Adder
1.24941176470588241.062
934146AD1-041 E
Adder
3.52588235294117652.997
957601AF2-054 C
Adder
2.07411764705882361.763
901082W1-029 E
Adder
24.7470588235294121.035
958261AF2-120 C
Adder
6.0223529411764715.119
NYPJM->LTFIMP_NY
CLTF
0.8060.806
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.3964.396
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0520.052
MECLTFEXP_MEC->PJM
CLTF
0.2980.298
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.1280.128
LAGNLTFEXP_LAGN->PJM
CLTF
2.0762.076
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.6452.645
CBM South 2LTFEXP_CBM-S2->PJM
CBM
41.47141.471
CPLELTFEXP_CPLE->PJM
CLTF
5.5585.558
TVALTFEXP_TVA->PJM
CLTF
1.5691.569
O66PJM->LTFIMP_O-066
CMTX_NF
10.11910.119
G-007PJM->LTFIMP_G-007
CMTX_NF
1.5811.581
SIGELTFEXP_SIGE->PJM
CLTF
0.0090.009

Details for 6LADYSMITH-8LADYSMITH 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H2T574_SRT-S_SENS


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6LADYSMITH-8LADYSMITH 230.0/500.0 kV Ckt 1 transformer
Contingency Name:
DVP_P4-2: H2T574_SRT-S_SENS
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:134.99 %
Rating:1031.0 MVA
Rating Type:C
MVA to Mitigate:1391.73
MW Contribution:7.89
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
926785AC1-164_E
Adder
12.38352941176470510.526
943471AF1-018 C
Adder
4.8258823529411774.102
316084AB2-161 E
Adder
2.89176470588235322.458
926472AC1-118 E
Adder
0.93294117647058830.793
3150731STONECA
Adder
4.3176470588235293.67
935161AD1-151 C
Adder
9.5447058823529418.113
932046AC2-012 E
Adder
6.28352941176470655.341
958161AF2-110 C
Adder
0.65058823529411770.553
938531AE1-072 C
Adder
8.2164705882352946.984
315051AA1-145 CT1
50/50
6.0866.086
927041AC1-191 C
50/50
8.7048.704
3138116ELKO L286
Adder
0.98705882352941180.839
961611AG1-000B C
Adder
8.8552941176470597.527
963611AG1-210 C
Adder
0.51647058823529410.439
3150371LDYSMT1
50/50
9.8049.804
3150431FOUR RIVERA
50/50
3.823.82
925865AC1-065 E
Adder
11.2164705882352949.534
961951AG1-038 C
Adder
2.37058823529411772.015
961952AG1-038 E
Adder
3.27294117647058822.782
936582AD2-073 E
Adder
0.880.748
3150391LDYSMT3
50/50
10.19310.193
939262AE1-157 E
50/50
14.45514.455
930122AB1-027 E
Adder
1.10941176470588230.943
316169AC1-164 GEN
Adder
27.56470588235294323.43
316349AD2-085 C
Adder
1.70235294117647061.447
935112AD1-144 E
Adder
0.46352941176470590.394
944582AF1-123 E
Adder
48.92705882352941441.588
944592AF1-124 E
Adder
49.10352941176470441.738
923832AB2-022 E
Adder
0.57647058823529410.49
957971AF2-091 C
Adder
2.08705882352941161.774
939261AE1-157 C
50/50
26.64926.649
966882AG1-559 E
50/50
2.1092.109
966872AG1-558 E
50/50
1.0921.092
966871AG1-558 C
50/50
2.1682.168
316076AC2-137 E
Adder
0.94588235294117650.804
3150831SPRUNCA
Adder
5.78235294117647054.915
3150841SPRUNCB
Adder
5.78235294117647054.915
923842AB2-024 E
Adder
1.21529411764705891.033
316157AD2-030 E
Adder
0.79764705882352950.678
926662AC1-147 E
Adder
0.63529411764705890.54
916192Z1-068 E
Adder
0.89294117647058820.759
957492AF2-043 E
Adder
0.67176470588235290.571
964211AG1-282 C
Adder
1.54470588235294121.313
957191AF2-013 C
Adder
15.57176470588235313.236
3141316ARNOLDS
50/50
0.2260.226
3150481FOUR RIVERF
50/50
4.5984.598
927042AC1-191 E
50/50
4.3364.336
935162AD1-151 E
Adder
6.3635294117647065.409
316233AE1-074 C
Adder
1.32470588235294121.126
940551AE2-041 C
Adder
4.8258823529411774.102
957832AF2-077 E
Adder
0.87647058823529410.745
943461AF1-017 C
Adder
0.66705882352941170.567
932596AC2-079 E
Adder
4.6035294117647063.913
316311AC2-079 C
Adder
2.82235294117647052.399
938532AE1-072 E
Adder
4.2835294117647063.641
3146326AYDLETT TAP
Adder
0.63411764705882360.539
917122Z2-027 E
Adder
0.62117647058823530.528
3150381LDYSMT2
50/50
9.9319.931
3150601CHESTF5
Adder
42.53058823529412536.151
925332AB2-190 E
Adder
4.8388235294117664.113
927226AC1-216 E
Adder
4.497647058823533.823
962962AG1-145 E
Adder
0.87058823529411770.74
936666AD2-085 E
Adder
2.7764705882352942.36
941591AE2-156 C
Adder
8.587.293
944601AF1-125 C
Adder
21.0376470588235317.882
944591AF1-124 C
Adder
21.4423529411764718.226
964212AG1-282 E
Adder
1.02941176470588250.875
966881AG1-559 C
50/50
4.1864.186
944631AF1-128 C
Adder
26.61176470588235422.62
938552AE1-074 E
Adder
0.66705882352941170.567
316160AE1-175 E
Adder
0.71882352941176480.611
3150921YORKTN3
Adder
67.1576470588235357.084
934782AD1-105 E
50/50
4.8864.886
3145256KINGFORK
Adder
0.49882352941176470.424
925522AC1-027 E
Adder
0.57882352941176470.492
926755AC1-161 E
Adder
6.0694117647058825.159
933291AC2-141 C
Adder
14.21882352941176512.086
941102AE2-104 E
Adder
2.53411764705882362.154
957872AF2-081 E
Adder
2.00588235294117641.705
936592AD2-074 E
Adder
6.6858823529411765.683
3150411LDYSMT5
50/50
10.24410.244
940432AE2-027 E
Adder
5.2776470588235294.486
934012AD1-025 E
Adder
5.82352941176470654.95
939612AE1-191 E
Adder
3.8317647058823533.257
957602AF2-054 E
Adder
0.94823529411764720.806
913392Y1-086 E
Adder
1.020.867
958262AF2-120 E
Adder
3.15764705882352952.684
966661AG1-536 C
Adder
4.0741176470588243.463
316078AC2-138 E
Adder
0.72235294117647060.614
944491AF1-114 C
Adder
6.13764705882352955.217
3150331BIRCHWDA
50/50
33.12333.123
315052AA1-145 CT2
50/50
6.0836.083
3150471FOUR RIVERE
50/50
3.7653.765
3142296MT RD221
50/50
0.1070.107
942001AE2-212 C
Adder
1.26117647058823531.072
939192AE1-149 E
Adder
3.88470588235294123.302
939312AE1-162 E
Adder
0.74588235294117660.634
934065AD1-033 E
Adder
2.36588235294117682.011
937226AE2-253 E
Adder
2.742.329
943741AF1-042 C
Adder
2.1447058823529411.823
962861AG1-135 C
Adder
4.5670588235294123.882
3141813NORNECK
Adder
0.68705882352941170.584
3150451FOUR RIVERC
50/50
4.6684.668
944641AF1-129 C
Adder
64.8858823529411855.153
316240AF1-291 C
Adder
1.34352941176470591.142
3150501FOURRIVERG
50/50
4.5754.575
924814AB2-134 E
Adder
7.3670588235294126.262
942342AE2-247 E
Adder
1.01882352941176470.866
919152AA1-139 E1
Adder
1.91411764705882351.627
939246AE1-155 E
Adder
6.5952941176470595.606
957972AF2-091 E
Adder
2.8811764705882352.449
3150441FOUR RIVERB
50/50
3.823.82
3150651CHESTF6
Adder
11.81411764705882410.042
946262AF1-291 E
Adder
0.89529411764705890.761
3130536PAPERMILL
Adder
4.4917647058823533.818
939602AE1-190 E
Adder
0.95764705882352940.814
934576AD1-082 E
Adder
2.3047058823529411.959
933292AC2-141 E
Adder
6.0694117647058825.159
944602AF1-125 E
Adder
48.1588235294117740.935
3145506HICKORY
Adder
1.02470588235294110.871
943612AF1-032 E
Adder
0.43647058823529410.371
957871AF2-081 C
Adder
4.6800000000000013.978
936591AD2-074 C
Adder
4.0976470588235293.483
926412AC1-112 E
Adder
0.90235294117647060.767
934781AD1-105 C
50/50
1.1781.178
942341AE2-247 C
Adder
0.73764705882352940.627
943462AF1-017 E
Adder
1.08941176470588250.926
958162AF2-110 E
Adder
1.0352941176470590.88
919153AA1-139 E2
Adder
1.91411764705882351.627
963612AG1-210 E
Adder
0.77411764705882360.658
3150461FOUR RIVERD
50/50
3.7653.765
940431AE2-027 C
Adder
7.917647058823536.73
942002AE2-212 E
Adder
0.84117647058823530.715
934392AD1-063 E
Adder
0.72352941176470590.615
944581AF1-123 C
Adder
21.36588235294117818.161
941101AE2-104 C
Adder
1.59411764705882361.355
943742AF1-042 E
Adder
3.4988235294117652.974
962862AG1-135 E
Adder
3.04470588235294142.588
966662AG1-536 E
Adder
5.4752941176470594.654
944492AF1-114 E
Adder
8.4752941176470587.204
3150401LDYSMT4
50/50
10.21210.212
939191AE1-149 C
Adder
5.8258823529411774.952
3143316POE
Adder
0.71411764705882350.607
934146AD1-041 E
Adder
2.3952941176470592.036
957601AF2-054 C
Adder
1.42235294117647081.209
958261AF2-120 C
Adder
4.7364705882352944.026
NYPJM->LTFIMP_NY
CLTF
0.920.92
LGEELTFEXP_LGEE->PJM
CLTF
0.1870.187
WECLTFEXP_WEC->PJM
CLTF
0.0880.088
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.7883.788
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.7974.797
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.6820.682
LAGNLTFEXP_LAGN->PJM
CLTF
1.8271.827
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.6281.628
CBM South 2LTFEXP_CBM-S2->PJM
CBM
27.18327.183
CPLELTFEXP_CPLE->PJM
CLTF
3.4193.419
TVALTFEXP_TVA->PJM
CLTF
1.4341.434
O66PJM->LTFIMP_O-066
CMTX_NF
12.34612.346
G-007PJM->LTFIMP_G-007
CMTX_NF
1.9371.937
SIGELTFEXP_SIGE->PJM
CLTF
0.040.04

Details for AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line l/o DVP_P4-1: G_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line
Contingency Name:
DVP_P4-1: G_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:131.48 %
Rating:249.0 MVA
Rating Type:C
MVA to Mitigate:327.39
MW Contribution:39.66
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
2.8752941176470592.444
925865AC1-065 E
50/50
9.839.83
939601AE1-190 C
50/50
0.2520.252
961951AG1-038 C
50/50
9.9899.989
961952AG1-038 E
50/50
13.79413.794
316157AD2-030 E
50/50
1.1141.114
940551AE2-041 C
Adder
2.8752941176470592.444
957832AF2-077 E
Adder
0.6764705882352940.575
316156AD2-030 C
50/50
0.3560.356
936592AD2-074 E
50/50
28.18128.181
939612AE1-191 E
50/50
4.224.22
957602AF2-054 E
50/50
1.3241.324
958262AF2-120 E
50/50
15.86515.865
966661AG1-536 C
50/50
20.47120.471
943741AF1-042 C
50/50
9.0389.038
962861AG1-135 C
50/50
22.09222.092
316280AD1-041 C
50/50
0.6440.644
939246AE1-155 E
50/50
33.13733.137
939602AE1-190 E
50/50
1.0551.055
939611AE1-191 C
50/50
1.0161.016
936591AD2-074 C
50/50
17.27217.272
934392AD1-063 E
Adder
0.431764705882352940.367
943742AF1-042 E
50/50
14.74614.746
962862AG1-135 E
50/50
14.72814.728
966662AG1-536 E
50/50
27.50827.508
316201AC1-065 C
50/50
0.9610.961
3141843SHACKLE
50/50
0.3130.313
934146AD1-041 E
50/50
2.6382.638
957601AF2-054 C
50/50
1.9861.986
958261AF2-120 C
50/50
23.79823.798
316404AE1-155 C
50/50
8.0738.073
NYPJM->LTFIMP_NY
CLTF
0.0440.044
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.0030.003
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0090.009
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0260.026
LAGNLTFEXP_LAGN->PJM
CLTF
0.020.02
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0470.047
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.7050.705
CPLELTFEXP_CPLE->PJM
CLTF
0.0980.098
TVALTFEXP_TVA->PJM
CLTF
0.0150.015
O66PJM->LTFIMP_O-066
CMTX_NF
0.5760.576
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0110.011
G-007PJM->LTFIMP_G-007
CMTX_NF
0.090.09
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0180.018
MDUPJM->LTFIMP_MDU
CLTF
0.0010.001
CONTINGENCY 'DVP_P1-3: 6NORNECK-TX#4_SRT-A'
 OPEN BRANCH FROM BUS 314181 TO BUS 314182 CKT 1   /*3NORNECK     115.0 - 6NORNECK     230.0
END
CONTINGENCY 'DVP_P4-2: H2T557_SRT-S'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S_SENS'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 313483 CKT 1 /*8LADYSMITH   500.0 - 8KRAKEN      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 313483 CKT 1 /*8LADYSMITH   500.0 - 8KRAKEN      500.0
END
CONTINGENCY 'DVP_P4-1: G_SRT-A'
 OPEN BRANCH FROM BUS 314181 TO BUS 315034 CKT 1   /*3NORNECK     115.0 - 1NORNECKC1    13.2
 OPEN BRANCH FROM BUS 314181 TO BUS 315035 CKT 1   /*3NORNECK     115.0 - 1NORNECKC2    13.2
 OPEN BRANCH FROM BUS 314181 TO BUS 316399 CKT 2   /*3NORNECK     115.0 - AE1-155 TAP  115.0
 OPEN BUS 315034                                   /*1NORNECKC1    13.2
 OPEN BUS 315035                                   /*1NORNECKC2    13.2
END
314181 to 314182 ckt 2
314218 to 314908 ckt 1
314196 to 314911 ckt 1
316399 to 314181 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1DVP
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
DVP_P1-2: LN 574_SRT-S
SingleAC102.41 %548.02B561.237.82
GD1DVP
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
DVP_P4-2: 574T581_SRT-S
BreakerAC102.09 %671.0C684.9913.04
GD1DVP
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
DVP_P4-2: H1T574_SRT-S
BreakerAC102.01 %671.0C684.5113.03
GD1DVP
6FINES-6FREDBRG 230.0 kV Ckt 1 line
DVP_P1-2: LN 574_SRT-S
SingleAC102.36 %548.02B560.957.82
GD1DVP
6FINES-6FREDBRG 230.0 kV Ckt 1 line
DVP_P4-2: 574T581_SRT-S
BreakerAC102.05 %671.0C684.7713.04
GD1DVP
6FINES-6FREDBRG 230.0 kV Ckt 1 line
DVP_P4-2: H1T574_SRT-S
BreakerAC101.97 %671.0C684.2513.03
GD1DVP
8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line
DVP_P4-2: 563T576_SRT-S
BreakerAC104.31 %3637.0C3793.6515.33
GD1DVP
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
DVP_P1-2: LN 576_SRT-A
SingleAC111.58 %4070.2B4541.479.54
GD1DVP
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
DVP_P1-2: LN 563_SRT-S-1
SingleAC100.74 %4070.2B4100.488.1
GD1DVP
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
DVP_P1-2: LN 581_SRT-S
SingleAC100.26 %3220.44B3228.895.22
GD1DVP
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
DVP_P1-2: LN 581_SRT-S
SingleAC113.93 %3220.44B3669.136.55
GD1DVP
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
DVP_P1-2: LN 552_SRT-S
SingleAC111.75 %3220.44B3598.916.41
GD1DVP
8OX-8CLIFTON 500.0 kV Ckt 1 line
DVP_P7-1: LN 2101-569_SRT-S
TowerAC105.43 %3144.0C3314.567.88
GD1DVP
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
DVP_P1-2: LN 552_SRT-S
SingleAC119.78 %3220.44B3857.576.4
GD1DVP
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
DVP_P1-2: LN 581_SRT-S
SingleAC118.71 %3220.44B3823.16.3
GD1DVP
AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
SingleAC116.08 %203.98B236.7837.19
GD1DVP
AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line
DVP_P4-2: 65T1021_SRT-A
BreakerAC195.84 %249.0C487.6361.98
GD1DVP
AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-A
SingleAC118.26 %203.98B241.2337.19

Details for 6BIRCHWD-6FINES 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 574_SRT-S
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:102.41 %
Rating:548.02 MVA
Rating Type:B
MVA to Mitigate:561.23
MW Contribution:7.82
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
80/20
4.7754.775
963611AG1-210 C
80/20
0.9780.978
316059AD1-063 C
80/20
0.1750.175
957831AF2-077 C
80/20
0.1730.173
961951AG1-038 C
80/20
3.6023.602
3141316ARNOLDS
80/20
1.0061.006
316223AC1-118 C
80/20
0.7780.778
316314AB2-024 C
80/20
0.1870.187
957971AF2-091 C
80/20
7.1897.189
316077AC2-138 C
80/20
0.3340.334
939601AE1-190 C
80/20
0.2320.232
957191AF2-013 C
80/20
65.4565.45
964211AG1-282 C
80/20
2.7362.736
3150351NORNECKC2
80/20
0.9550.955
316156AD2-030 C
80/20
0.270.27
940551AE2-041 C
80/20
4.7754.775
966661AG1-536 C
80/20
6.7266.726
3150331BIRCHWDA
80/20
157.915157.915
944491AF1-114 C
80/20
21.14321.143
316337AD2-073 C
80/20
0.6540.654
962861AG1-135 C
80/20
7.4027.402
943741AF1-042 C
80/20
3.2593.259
316280AD1-041 C
80/20
0.5940.594
936591AD2-074 C
80/20
6.2296.229
3141843SHACKLE
80/20
0.3510.351
3150341NORNECKC1
80/20
0.9910.991
316201AC1-065 C
80/20
1.0771.077
939611AE1-191 C
80/20
0.9370.937
316404AE1-155 C
80/20
2.6442.644
958261AF2-120 C
80/20
7.827.82
957601AF2-054 C
80/20
1.5141.514
NYPJM->LTFIMP_NY
CLTF
0.5030.503
LGEELTFEXP_LGEE->PJM
CLTF
0.330.33
WECLTFEXP_WEC->PJM
CLTF
0.1690.169
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.1858.185
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.0175.017
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.9570.957
LAGNLTFEXP_LAGN->PJM
CLTF
1.6281.628
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.9610.961
CBM South 2LTFEXP_CBM-S2->PJM
CBM
17.50517.505
CPLELTFEXP_CPLE->PJM
CLTF
2.0152.015
TVALTFEXP_TVA->PJM
CLTF
1.3021.302
SIGELTFEXP_SIGE->PJM
CLTF
0.0620.062

Details for 6BIRCHWD-6FINES 230.0 kV Ckt 1 line l/o DVP_P4-2: 574T581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 574T581_SRT-S
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.09 %
Rating:671.0 MVA
Rating Type:C
MVA to Mitigate:684.99
MW Contribution:13.04
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
50/50
4.7784.778
926472AC1-118 E
50/50
2.4632.463
963611AG1-210 C
50/50
0.9780.978
316059AD1-063 C
50/50
0.1750.175
961952AG1-038 E
50/50
4.9764.976
961951AG1-038 C
50/50
3.6043.604
925865AC1-065 E
50/50
11.05611.056
3141316ARNOLDS
50/50
1.0071.007
316223AC1-118 C
50/50
0.7780.778
936582AD2-073 E
50/50
1.9881.988
957971AF2-091 C
50/50
7.1897.189
316077AC2-138 C
50/50
0.3340.334
939601AE1-190 C
50/50
0.2330.233
923842AB2-024 E
Adder
1.14941176470588240.977
316157AD2-030 E
50/50
0.850.85
957191AF2-013 C
50/50
65.45565.455
964211AG1-282 C
50/50
2.7362.736
3150351NORNECKC2
50/50
0.9560.956
316156AD2-030 C
50/50
0.2710.271
964212AG1-282 E
50/50
1.8241.824
940551AE2-041 C
50/50
4.7784.778
957832AF2-077 E
Adder
0.74823529411764710.636
936592AD2-074 E
50/50
10.16610.166
316078AC2-138 E
50/50
1.3691.369
966661AG1-536 C
50/50
6.7286.728
958262AF2-120 E
50/50
5.2155.215
939612AE1-191 E
50/50
3.9083.908
957602AF2-054 E
50/50
1.011.01
3150331BIRCHWDA
50/50
157.926157.926
944491AF1-114 C
50/50
21.14521.145
316337AD2-073 C
50/50
0.6540.654
3141813NORNECK
50/50
1.3031.303
962861AG1-135 C
50/50
7.4047.404
943741AF1-042 C
50/50
3.263.26
316280AD1-041 C
50/50
0.5940.594
939246AE1-155 E
50/50
10.89210.892
957972AF2-091 E
50/50
9.9289.928
936591AD2-074 C
50/50
6.2316.231
939602AE1-190 E
50/50
0.9770.977
3130536PAPERMILL
Adder
4.2870588235294123.644
963612AG1-210 E
50/50
1.4671.467
3150341NORNECKC1
50/50
0.9910.991
316201AC1-065 C
50/50
1.0771.077
966662AG1-536 E
50/50
9.0419.041
962862AG1-135 E
50/50
4.9364.936
943742AF1-042 E
50/50
5.325.32
939611AE1-191 C
50/50
0.9380.938
934392AD1-063 E
50/50
0.7170.717
944492AF1-114 E
50/50
29.20129.201
316404AE1-155 C
50/50
2.6442.644
958261AF2-120 C
50/50
7.8227.822
934146AD1-041 E
50/50
2.4422.442
957601AF2-054 C
50/50
1.5141.514
NYPJM->LTFIMP_NY
CLTF
0.5040.504
LGEELTFEXP_LGEE->PJM
CLTF
0.330.33
WECLTFEXP_WEC->PJM
CLTF
0.1690.169
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.1928.192
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.0235.023
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.9580.958
LAGNLTFEXP_LAGN->PJM
CLTF
1.631.63
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.9630.963
CBM South 2LTFEXP_CBM-S2->PJM
CBM
17.53417.534
CPLELTFEXP_CPLE->PJM
CLTF
2.0182.018
TVALTFEXP_TVA->PJM
CLTF
1.3041.304
O66PJM->LTFIMP_O-066
CMTX_NF
7.0667.066
G-007PJM->LTFIMP_G-007
CMTX_NF
1.1121.112
SIGELTFEXP_SIGE->PJM
CLTF
0.0620.062

Details for 6BIRCHWD-6FINES 230.0 kV Ckt 1 line l/o DVP_P4-2: H1T574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: H1T574_SRT-S
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.01 %
Rating:671.0 MVA
Rating Type:C
MVA to Mitigate:684.51
MW Contribution:13.03
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
50/50
4.7734.773
926472AC1-118 E
50/50
2.4622.462
963611AG1-210 C
50/50
0.9780.978
316059AD1-063 C
50/50
0.1750.175
961952AG1-038 E
50/50
4.9734.973
961951AG1-038 C
50/50
3.6013.601
925865AC1-065 E
50/50
11.04511.045
3141316ARNOLDS
50/50
1.0061.006
316223AC1-118 C
50/50
0.7780.778
936582AD2-073 E
50/50
1.9871.987
957971AF2-091 C
50/50
7.1887.188
316077AC2-138 C
50/50
0.3340.334
939601AE1-190 C
50/50
0.2320.232
923842AB2-024 E
Adder
1.1482352941176470.976
316157AD2-030 E
50/50
0.8490.849
957191AF2-013 C
50/50
65.44365.443
964211AG1-282 C
50/50
2.7352.735
3150351NORNECKC2
50/50
0.9550.955
940551AE2-041 C
50/50
4.7734.773
957832AF2-077 E
Adder
0.74705882352941180.635
316156AD2-030 C
50/50
0.270.27
964212AG1-282 E
50/50
1.8231.823
936592AD2-074 E
50/50
10.1610.16
316078AC2-138 E
50/50
1.3691.369
966661AG1-536 C
50/50
6.7256.725
958262AF2-120 E
50/50
5.2125.212
939612AE1-191 E
50/50
3.9043.904
957602AF2-054 E
50/50
1.0091.009
3150331BIRCHWDA
50/50
157.902157.902
944491AF1-114 C
50/50
21.1421.14
316337AD2-073 C
50/50
0.6530.653
3141813NORNECK
50/50
1.3021.302
962861AG1-135 C
50/50
7.47.4
943741AF1-042 C
50/50
3.2583.258
316280AD1-041 C
50/50
0.5940.594
939246AE1-155 E
50/50
10.88610.886
957972AF2-091 E
50/50
9.9269.926
936591AD2-074 C
50/50
6.2276.227
939602AE1-190 E
50/50
0.9760.976
3130536PAPERMILL
Adder
4.2835294117647063.641
963612AG1-210 E
50/50
1.4661.466
3150341NORNECKC1
50/50
0.9910.991
316201AC1-065 C
50/50
1.0761.076
966662AG1-536 E
50/50
9.0369.036
962862AG1-135 E
50/50
4.9334.933
943742AF1-042 E
50/50
5.3165.316
939611AE1-191 C
50/50
0.9370.937
934392AD1-063 E
50/50
0.7160.716
944492AF1-114 E
50/50
29.19429.194
316404AE1-155 C
50/50
2.6432.643
958261AF2-120 C
50/50
7.8187.818
934146AD1-041 E
50/50
2.442.44
957601AF2-054 C
50/50
1.5131.513
NYPJM->LTFIMP_NY
CLTF
0.5030.503
LGEELTFEXP_LGEE->PJM
CLTF
0.3310.331
WECLTFEXP_WEC->PJM
CLTF
0.1690.169
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.2078.207
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.0255.025
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.9590.959
LAGNLTFEXP_LAGN->PJM
CLTF
1.631.63
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.9610.961
CBM South 2LTFEXP_CBM-S2->PJM
CBM
17.50917.509
CPLELTFEXP_CPLE->PJM
CLTF
2.0152.015
TVALTFEXP_TVA->PJM
CLTF
1.3041.304
O66PJM->LTFIMP_O-066
CMTX_NF
7.0617.061
G-007PJM->LTFIMP_G-007
CMTX_NF
1.1111.111
SIGELTFEXP_SIGE->PJM
CLTF
0.0620.062

Details for 6FINES-6FREDBRG 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6FINES-6FREDBRG 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 574_SRT-S
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:102.36 %
Rating:548.02 MVA
Rating Type:B
MVA to Mitigate:560.95
MW Contribution:7.82
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
80/20
4.7754.775
963611AG1-210 C
80/20
0.9780.978
316059AD1-063 C
80/20
0.1750.175
957831AF2-077 C
80/20
0.1730.173
940551AE2-041 C
80/20
4.7754.775
961951AG1-038 C
80/20
3.6023.602
3141316ARNOLDS
80/20
1.0061.006
316223AC1-118 C
80/20
0.7780.778
316314AB2-024 C
80/20
0.1870.187
957971AF2-091 C
80/20
7.1897.189
316077AC2-138 C
80/20
0.3340.334
939601AE1-190 C
80/20
0.2320.232
957191AF2-013 C
80/20
65.4565.45
964211AG1-282 C
80/20
2.7362.736
3150351NORNECKC2
80/20
0.9550.955
316156AD2-030 C
80/20
0.270.27
966661AG1-536 C
80/20
6.7266.726
3150331BIRCHWDA
80/20
157.915157.915
944491AF1-114 C
80/20
21.14321.143
316337AD2-073 C
80/20
0.6540.654
962861AG1-135 C
80/20
7.4027.402
943741AF1-042 C
80/20
3.2593.259
316280AD1-041 C
80/20
0.5940.594
936591AD2-074 C
80/20
6.2296.229
3141843SHACKLE
80/20
0.3510.351
3150341NORNECKC1
80/20
0.9910.991
316201AC1-065 C
80/20
1.0771.077
939611AE1-191 C
80/20
0.9370.937
316404AE1-155 C
80/20
2.6442.644
958261AF2-120 C
80/20
7.827.82
957601AF2-054 C
80/20
1.5141.514
NYPJM->LTFIMP_NY
CLTF
0.5030.503
LGEELTFEXP_LGEE->PJM
CLTF
0.330.33
WECLTFEXP_WEC->PJM
CLTF
0.1690.169
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.1858.185
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.0175.017
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.9570.957
LAGNLTFEXP_LAGN->PJM
CLTF
1.6281.628
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.9610.961
CBM South 2LTFEXP_CBM-S2->PJM
CBM
17.50517.505
CPLELTFEXP_CPLE->PJM
CLTF
2.0152.015
TVALTFEXP_TVA->PJM
CLTF
1.3021.302
SIGELTFEXP_SIGE->PJM
CLTF
0.0620.062

Details for 6FINES-6FREDBRG 230.0 kV Ckt 1 line l/o DVP_P4-2: 574T581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6FINES-6FREDBRG 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 574T581_SRT-S
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.05 %
Rating:671.0 MVA
Rating Type:C
MVA to Mitigate:684.77
MW Contribution:13.04
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
50/50
4.7784.778
926472AC1-118 E
50/50
2.4632.463
963611AG1-210 C
50/50
0.9780.978
316059AD1-063 C
50/50
0.1750.175
961952AG1-038 E
50/50
4.9764.976
961951AG1-038 C
50/50
3.6043.604
925865AC1-065 E
50/50
11.05611.056
3141316ARNOLDS
50/50
1.0071.007
316223AC1-118 C
50/50
0.7780.778
936582AD2-073 E
50/50
1.9881.988
957971AF2-091 C
50/50
7.1897.189
316077AC2-138 C
50/50
0.3340.334
939601AE1-190 C
50/50
0.2330.233
923842AB2-024 E
Adder
1.14941176470588240.977
316157AD2-030 E
50/50
0.850.85
957191AF2-013 C
50/50
65.45565.455
964211AG1-282 C
50/50
2.7362.736
3150351NORNECKC2
50/50
0.9560.956
316156AD2-030 C
50/50
0.2710.271
964212AG1-282 E
50/50
1.8241.824
940551AE2-041 C
50/50
4.7784.778
957832AF2-077 E
Adder
0.74823529411764710.636
936592AD2-074 E
50/50
10.16610.166
316078AC2-138 E
50/50
1.3691.369
966661AG1-536 C
50/50
6.7286.728
958262AF2-120 E
50/50
5.2155.215
939612AE1-191 E
50/50
3.9083.908
957602AF2-054 E
50/50
1.011.01
3150331BIRCHWDA
50/50
157.926157.926
944491AF1-114 C
50/50
21.14521.145
316337AD2-073 C
50/50
0.6540.654
3141813NORNECK
50/50
1.3031.303
962861AG1-135 C
50/50
7.4047.404
943741AF1-042 C
50/50
3.263.26
316280AD1-041 C
50/50
0.5940.594
939246AE1-155 E
50/50
10.89210.892
957972AF2-091 E
50/50
9.9289.928
936591AD2-074 C
50/50
6.2316.231
939602AE1-190 E
50/50
0.9770.977
3130536PAPERMILL
Adder
4.2870588235294123.644
963612AG1-210 E
50/50
1.4671.467
3150341NORNECKC1
50/50
0.9910.991
316201AC1-065 C
50/50
1.0771.077
966662AG1-536 E
50/50
9.0419.041
962862AG1-135 E
50/50
4.9364.936
943742AF1-042 E
50/50
5.325.32
939611AE1-191 C
50/50
0.9380.938
934392AD1-063 E
50/50
0.7170.717
944492AF1-114 E
50/50
29.20129.201
316404AE1-155 C
50/50
2.6442.644
958261AF2-120 C
50/50
7.8227.822
934146AD1-041 E
50/50
2.4422.442
957601AF2-054 C
50/50
1.5141.514
NYPJM->LTFIMP_NY
CLTF
0.5040.504
LGEELTFEXP_LGEE->PJM
CLTF
0.330.33
WECLTFEXP_WEC->PJM
CLTF
0.1690.169
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.1928.192
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.0235.023
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.9580.958
LAGNLTFEXP_LAGN->PJM
CLTF
1.631.63
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.9630.963
CBM South 2LTFEXP_CBM-S2->PJM
CBM
17.53417.534
CPLELTFEXP_CPLE->PJM
CLTF
2.0182.018
TVALTFEXP_TVA->PJM
CLTF
1.3041.304
O66PJM->LTFIMP_O-066
CMTX_NF
7.0667.066
G-007PJM->LTFIMP_G-007
CMTX_NF
1.1121.112
SIGELTFEXP_SIGE->PJM
CLTF
0.0620.062

Details for 6FINES-6FREDBRG 230.0 kV Ckt 1 line l/o DVP_P4-2: H1T574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6FINES-6FREDBRG 230.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: H1T574_SRT-S
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.97 %
Rating:671.0 MVA
Rating Type:C
MVA to Mitigate:684.25
MW Contribution:13.03
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
50/50
4.7734.773
926472AC1-118 E
50/50
2.4622.462
963611AG1-210 C
50/50
0.9780.978
316059AD1-063 C
50/50
0.1750.175
961952AG1-038 E
50/50
4.9734.973
961951AG1-038 C
50/50
3.6013.601
925865AC1-065 E
50/50
11.04511.045
3141316ARNOLDS
50/50
1.0061.006
316223AC1-118 C
50/50
0.7780.778
936582AD2-073 E
50/50
1.9871.987
957971AF2-091 C
50/50
7.1887.188
316077AC2-138 C
50/50
0.3340.334
939601AE1-190 C
50/50
0.2320.232
923842AB2-024 E
Adder
1.1482352941176470.976
316157AD2-030 E
50/50
0.8490.849
957191AF2-013 C
50/50
65.44365.443
964211AG1-282 C
50/50
2.7352.735
3150351NORNECKC2
50/50
0.9550.955
316156AD2-030 C
50/50
0.270.27
964212AG1-282 E
50/50
1.8231.823
940551AE2-041 C
50/50
4.7734.773
957832AF2-077 E
Adder
0.74705882352941180.635
936592AD2-074 E
50/50
10.1610.16
316078AC2-138 E
50/50
1.3691.369
966661AG1-536 C
50/50
6.7256.725
958262AF2-120 E
50/50
5.2125.212
939612AE1-191 E
50/50
3.9043.904
957602AF2-054 E
50/50
1.0091.009
3150331BIRCHWDA
50/50
157.902157.902
944491AF1-114 C
50/50
21.1421.14
316337AD2-073 C
50/50
0.6530.653
3141813NORNECK
50/50
1.3021.302
962861AG1-135 C
50/50
7.47.4
943741AF1-042 C
50/50
3.2583.258
316280AD1-041 C
50/50
0.5940.594
939246AE1-155 E
50/50
10.88610.886
957972AF2-091 E
50/50
9.9269.926
936591AD2-074 C
50/50
6.2276.227
939602AE1-190 E
50/50
0.9760.976
3130536PAPERMILL
Adder
4.2835294117647063.641
963612AG1-210 E
50/50
1.4661.466
3150341NORNECKC1
50/50
0.9910.991
316201AC1-065 C
50/50
1.0761.076
966662AG1-536 E
50/50
9.0369.036
962862AG1-135 E
50/50
4.9334.933
943742AF1-042 E
50/50
5.3165.316
939611AE1-191 C
50/50
0.9370.937
934392AD1-063 E
50/50
0.7160.716
944492AF1-114 E
50/50
29.19429.194
316404AE1-155 C
50/50
2.6432.643
958261AF2-120 C
50/50
7.8187.818
934146AD1-041 E
50/50
2.442.44
957601AF2-054 C
50/50
1.5131.513
NYPJM->LTFIMP_NY
CLTF
0.5030.503
LGEELTFEXP_LGEE->PJM
CLTF
0.3310.331
WECLTFEXP_WEC->PJM
CLTF
0.1690.169
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.2078.207
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.0255.025
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.9590.959
LAGNLTFEXP_LAGN->PJM
CLTF
1.631.63
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.9610.961
CBM South 2LTFEXP_CBM-S2->PJM
CBM
17.50917.509
CPLELTFEXP_CPLE->PJM
CLTF
2.0152.015
TVALTFEXP_TVA->PJM
CLTF
1.3041.304
O66PJM->LTFIMP_O-066
CMTX_NF
7.0617.061
G-007PJM->LTFIMP_G-007
CMTX_NF
1.1111.111
SIGELTFEXP_SIGE->PJM
CLTF
0.0620.062

Details for 8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line l/o DVP_P4-2: 563T576_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 563T576_SRT-S
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.31 %
Rating:3637.0 MVA
Rating Type:C
MVA to Mitigate:3793.65
MW Contribution:15.33
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
11.3211764705882359.623
926785AC1-164_E
50/50
29.20829.208
316236AE1-162 C
50/50
0.5940.594
316084AB2-161 E
Adder
8.0411764705882356.835
3152331SURRY 2
50/50
52.5452.54
316017AA1-139 ULT1
50/50
1.9391.939
313526AB2-022 C
50/50
0.6650.665
3145946PLYMOUTH TP
Adder
0.51882352941176470.441
933982AD1-022 E
Adder
7.5341176470588246.404
940641AE2-051 C
50/50
26.37426.374
935161AD1-151 C
Adder
22.94117647058823619.5
932046AC2-012 E
50/50
23.72823.728
958161AF2-110 C
50/50
2.3482.348
938531AE1-072 C
50/50
31.50731.507
3145393UNCAMP
Adder
9.815294117647068.343
933981AD1-022 C
Adder
13.8411.764
900672V4-068 E
Adder
0.53882352941176470.458
963611AG1-210 C
Adder
0.93294117647058830.793
3138116ELKO L286
Adder
1.84941176470588251.572
961611AG1-000B C
Adder
25.22588235294117721.442
316072AD1-144 C
50/50
0.4940.494
316375AC2-012 C
50/50
2.4382.438
940541AE2-040 C
Adder
3.79058823529411763.222
940481AE2-033 C
Adder
21.4117647058823518.2
940482AE2-033 E
Adder
14.43529411764705912.27
923263AB1-132 E OP
Adder
8.3529411764705897.1
957831AF2-077 C
50/50
0.570.57
961952AG1-038 E
Adder
6.66352941176470555.664
961951AG1-038 C
Adder
4.8258823529411774.102
925865AC1-065 E
Adder
25.8294117647058821.955
3144216WINCHST
50/50
0.2410.241
316316AC1-027 C
50/50
0.5710.571
944012AF1-069 E
Adder
7.04588235294117655.989
316169AC1-164 GEN
50/50
65.01265.012
935112AD1-144 E
50/50
1.661.66
316349AD2-085 C
Adder
5.5541176470588244.721
3151091ELIZAR2
50/50
5.6915.691
944582AF1-123 E
50/50
191.735191.735
944592AF1-124 E
50/50
192.429192.429
923832AB2-022 E
50/50
2.1962.196
938772AE1-103 E
Adder
6.6011764705882355.611
916042Z1-036 E
50/50
48.46248.462
960082AF2-299 E
Adder
1.01882352941176470.866
946281AF1-292 C
Adder
2.03764705882352941.732
926071AC1-086 C
Adder
28.7023529411764724.397
963042AG1-153 E
Adder
11.4941176470588249.77
923842AB2-024 E
Adder
2.84000000000000032.414
316076AC2-137 E
Adder
1.77294117647058821.507
926662AC1-147 E
50/50
2.3992.399
3151081ELIZAR1
50/50
5.7935.793
916192Z1-068 E
50/50
3.4083.408
957492AF2-043 E
50/50
2.5222.522
923852AB2-025 E
Adder
1.53294117647058831.303
939412AE1-173 E
50/50
96.4696.46
961942AG1-037 E
Adder
0.50470588235294120.429
961941AG1-037 C
Adder
0.75764705882352950.644
941031AE2-094 C
Adder
55.5058823529411847.18
941032AE2-094 E
Adder
24.8621.131
316157AD2-030 E
Adder
1.88588235294117661.603
964211AG1-282 C
Adder
2.87176470588235282.441
962962AG1-145 E
50/50
2.6032.603
3150601CHESTF5
Adder
80.1388235294117768.118
925332AB2-190 E
Adder
11.1811764705882369.504
927226AC1-216 E
Adder
11.3047058823529419.609
936666AD2-085 E
Adder
9.0611764705882357.702
941591AE2-156 C
50/50
32.45632.456
3151101ELIZAR3
50/50
5.8665.866
944591AF1-124 C
50/50
84.02984.029
944601AF1-125 C
50/50
82.44182.441
938771AE1-103 C
Adder
4.7799999999999994.063
3145413WATKINS
Adder
1.09647058823529430.932
960081AF2-299 C
Adder
2.46117647058823552.092
926072AC1-086 E
Adder
13.06352941176470511.104
944011AF1-069 C
Adder
18.13647058823529415.416
963041AG1-153 C
Adder
7.662352941176476.513
964212AG1-282 E
Adder
1.91529411764705881.628
940551AE2-041 C
Adder
11.3211764705882359.623
935162AD1-151 E
Adder
15.29411764705882413
943461AF1-017 C
Adder
2.17764705882352951.851
932596AC2-079 E
Adder
15.21999999999999912.937
316311AC2-079 C
Adder
9.3282352941176477.929
938532AE1-072 E
50/50
16.42416.424
3146326AYDLETT TAP
50/50
2.4292.429
917122Z2-027 E
50/50
2.3642.364
3156056W1-029WIND
50/50
1.351.35
920692AA2-178 E
Adder
6.7435294117647065.732
957832AF2-077 E
50/50
2.4692.469
936592AD2-074 E
Adder
13.61411764705882311.572
316160AE1-175 E
50/50
2.1482.148
944631AF1-128 C
Adder
50.1435294117647142.622
3150921YORKTN3
50/50
222.183222.183
3145256KINGFORK
50/50
1.7881.788
925522AC1-027 E
50/50
2.2062.206
941102AE2-104 E
50/50
9.159.15
957872AF2-081 E
50/50
7.7017.701
316018AA1-139 ULT2
50/50
1.9391.939
933291AC2-141 C
50/50
59.4559.45
926755AC1-161 E
50/50
25.37725.377
316078AC2-138 E
Adder
1.30588235294117671.11
966661AG1-536 C
Adder
7.9129411764705886.726
958262AF2-120 E
Adder
6.1329411764705885.213
939612AE1-191 E
Adder
8.9247058823529427.586
934012AD1-025 E
Adder
14.63647058823529612.441
3151161SURRY 1
50/50
40.01540.015
3150991CHESPKB
50/50
1.3041.304
913392Y1-086 E
50/50
3.893.89
939411AE1-173 C
50/50
144.69144.69
3137643SOCKMAN
Adder
0.96588235294117640.821
957602AF2-054 E
Adder
2.24117647058823531.905
3141813NORNECK
Adder
1.24235294117647071.056
962861AG1-135 C
Adder
8.9694117647058827.624
943741AF1-042 C
Adder
4.3658823529411773.711
939192AE1-149 E
Adder
9.628.177
939312AE1-162 E
50/50
2.4312.431
934065AD1-033 E
50/50
9.1079.107
937226AE2-253 E
50/50
10.53510.535
3156116Z1-036WIND
50/50
1.1111.111
934501AD1-074 C
Adder
53.8447058823529445.768
924517AB2-100 E2
Adder
3.87764705882352923.296
939246AE1-155 E
Adder
12.80941176470588310.888
924814AB2-134 E
Adder
18.51882352941176515.741
942342AE2-247 E
Adder
3.3247058823529412.826
316036AC1-147 C
50/50
0.6650.665
316305AF2-043 C
50/50
0.6160.616
919152AA1-139 E1
50/50
7.3487.348
316321Z2-027 C
50/50
0.6380.638
934521AD1-076 C
Adder
19.5552941176470616.622
934511AD1-075 C
Adder
13.46117647058823511.442
920042AA2-088 E OP
Adder
16.1705882352941213.745
3145723EMPORIA
Adder
0.57058823529411760.485
923573AB1-173 E OP
Adder
4.3988235294117643.739
919692AA2-053 E OP
Adder
5.8800000000000014.998
936591AD2-074 C
Adder
8.3435294117647067.092
939602AE1-190 E
Adder
2.23058823529411751.896
3130536PAPERMILL
Adder
10.4988235294117648.924
934576AD1-082 E
Adder
6.4070588235294125.446
943612AF1-032 E
50/50
1.6391.639
3145506HICKORY
50/50
3.9493.949
944602AF1-125 E
50/50
188.725188.725
957871AF2-081 C
50/50
17.9717.97
933292AC2-141 E
50/50
25.37725.377
940492AE2-034 E
Adder
5.057647058823534.299
934522AD1-076 E
Adder
9.9670588235294128.472
943172AE2-346 E
Adder
0.90941176470588240.773
918492AA1-063AE OP
Adder
5.82352941176470654.95
925122AB2-169 E
Adder
8.6941176470588237.39
917332KELFORD E
Adder
2.42.04
963612AG1-210 E
Adder
1.39882352941176481.189
316159AE1-175 C
50/50
0.7040.704
943462AF1-017 E
Adder
3.55294117647058853.02
942341AE2-247 C
Adder
2.40705882352941152.046
316246AF1-032 C
50/50
0.5030.503
958162AF2-110 E
50/50
3.7353.735
316388AE2-253 GEN
50/50
3.5313.531
919153AA1-139 E2
50/50
7.3487.348
316320Y1-086 C
50/50
0.3880.388
934502AD1-074 E
Adder
27.4094117647058823.298
934512AD1-075 E
Adder
6.8529411764705895.825
918512AA1-065 E OP
Adder
8.4494117647058827.182
924516AB2-100 E1
Adder
3.87764705882352923.296
940642AE2-051 E
50/50
17.58317.583
966621AG1-532 C
Adder
1.84588235294117651.569
966662AG1-536 E
Adder
10.6329411764705889.038
962862AG1-135 E
Adder
5.985.083
943742AF1-042 E
Adder
7.1235294117647056.055
934392AD1-063 E
Adder
1.69764705882352951.443
916191Z1-068 C
50/50
0.0790.079
941101AE2-104 C
50/50
5.7555.755
316185AD1-033 C
50/50
2.2242.224
944581AF1-123 C
50/50
83.73183.731
316294AC1-161 C
50/50
9.6819.681
316141AB2-099 E
Adder
0.37882352941176470.322
316088AB2-174 E
Adder
8.6929411764705897.389
923994AB2-040_E
Adder
8.2482352941176477.011
958261AF2-120 C
Adder
9.1988235294117657.819
934146AD1-041 E
Adder
5.5776470588235294.741
316382AG1-145 C
50/50
0.6360.636
939191AE1-149 C
Adder
14.42941176470588312.265
3150981CHESPKA
50/50
0.7870.787
901082W1-029 E
50/50
55.655.6
957601AF2-054 C
Adder
3.36117647058823542.857
NYPJM->LTFIMP_NY
CLTF
2.0382.038
LGEELTFEXP_LGEE->PJM
CLTF
1.1621.162
WECLTFEXP_WEC->PJM
CLTF
0.5990.599
CBM West 1LTFEXP_CBM-W1->PJM
CBM
28.41628.416
CBM West 2LTFEXP_CBM-W2->PJM
CBM
23.24623.246
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
3.853.85
LAGNLTFEXP_LAGN->PJM
CLTF
8.2678.267
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
6.5566.556
CBM South 2LTFEXP_CBM-S2->PJM
CBM
111.34111.34
CPLELTFEXP_CPLE->PJM
CLTF
13.75813.758
TVALTFEXP_TVA->PJM
CLTF
6.4816.481
O66PJM->LTFIMP_O-066
CMTX_NF
27.4327.43
G-007PJM->LTFIMP_G-007
CMTX_NF
4.3044.304
SIGELTFEXP_SIGE->PJM
CLTF
0.2340.234

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 576_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:111.58 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4541.47
MW Contribution:9.54
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
12.16117647058823610.337
3151221GRAVEL6
80/20
4.54.5
3151201GRAVEL4
80/20
4.5054.505
3152331SURRY 2
80/20
45.81645.816
940641AE2-051 C
Adder
26.97529411764705622.929
316336AC2-165 C
Adder
13.90823529411764711.822
3150731STONECA
80/20
12.27512.275
935161AD1-151 C
80/20
28.71928.719
3150701DARBY 4
80/20
4.5974.597
3142366NRTHEST
80/20
0.330.33
958161AF2-110 C
Adder
2.38352941176470572.026
938531AE1-072 C
Adder
30.76823529411764526.153
933981AD1-022 C
Adder
14.54588235294117712.364
963611AG1-210 C
Adder
0.95764705882352940.814
961611AG1-000B C
80/20
28.34928.349
940541AE2-040 C
Adder
4.5529411764705883.87
940481AE2-033 C
Adder
25.6411764705882421.795
927041AC1-191 C
Adder
16.39529411764705813.936
940551AE2-041 C
Adder
12.16117647058823610.337
3150691DARBY 3
80/20
4.5924.592
943461AF1-017 C
Adder
2.34941176470588251.997
316311AC2-079 C
Adder
9.984705882352948.487
316233AE1-074 C
Adder
4.08588235294117653.473
961951AG1-038 C
Adder
5.035294117647064.28
3144216WINCHST
80/20
0.2370.237
3150791HOPHCF3
80/20
4.324.32
316169AC1-164 GEN
80/20
73.90473.904
316349AD2-085 C
Adder
5.9917647058823535.093
946281AF1-292 C
Adder
2.40117647058823552.041
926071AC1-086 C
Adder
32.9752941176470628.029
927021AC1-189 C
Adder
13.13058823529411811.161
964241AG1-285 C
Adder
17.71058823529411815.054
316075AC2-137 C
80/20
0.6870.687
3150611CHESTG7
80/20
6.9316.931
3150801HOPHCF4
80/20
6.5586.558
316369AC1-216 C
80/20
2.8462.846
3150831SPRUNCA
Adder
15.78000000000000113.413
3150841SPRUNCB
Adder
15.78000000000000113.413
961941AG1-037 C
Adder
0.82117647058823530.698
941031AE2-094 C
Adder
59.24117647058823650.355
934331AD1-057 C
Adder
5.3847058823529414.577
934321AD1-056 C
Adder
9.6541176470588248.206
966871AG1-558 C
Adder
4.0835294117647063.471
964211AG1-282 C
Adder
2.9811764705882352.534
3150601CHESTF5
80/20
113.981113.981
3150631CHESTG8
80/20
6.826.82
3150621CHESTS7
80/20
3.1823.182
941591AE2-156 C
Adder
31.64823529411764726.901
944591AF1-124 C
Adder
80.4988235294117868.424
944601AF1-125 C
Adder
78.9788235294117767.132
938771AE1-103 C
Adder
4.9788235294117654.232
960081AF2-299 C
Adder
2.92.465
944011AF1-069 C
Adder
19.35647058823529316.453
963041AG1-153 C
Adder
8.3011764705882357.056
936261AD2-033 C
Adder
18.25529411764705815.517
944631AF1-128 C
80/20
71.31971.319
3150921YORKTN3
80/20
215.99215.99
3151191GRAVEL3
80/20
4.4484.448
933291AC2-141 C
80/20
54.34454.344
966661AG1-536 C
Adder
8.2105882352941186.979
316312AB1-027 C
80/20
0.9570.957
3151161SURRY 1
80/20
43.78843.788
939411AE1-173 C
Adder
145.74235294117648123.881
3137643SOCKMAN
Adder
1.1117647058823530.945
962861AG1-135 C
Adder
9.3188235294117667.921
943741AF1-042 C
Adder
4.5552941176470593.872
3150641CHESTS8
80/20
3.5113.511
3150671DARBY 1
80/20
4.574.57
942001AE2-212 C
Adder
3.73882352941176473.178
934501AD1-074 C
Adder
56.2176470588235347.785
961671AG1-007 C
Adder
1.44941176470588241.232
934621AD1-088 C
Adder
13.69294117647058911.639
3150781HOPHCF2
80/20
4.324.32
3150761HOPPOLC
80/20
2.7172.717
316004AC1-112 C
80/20
0.5960.596
944641AF1-129 C
Adder
179.8423529411765152.866
316240AF1-291 C
Adder
3.78000000000000023.213
934521AD1-076 C
Adder
20.41647058823529517.354
934511AD1-075 C
Adder
14.05411764705882411.946
3142296MT RD221
80/20
0.2170.217
316263AC1-034 C
Adder
10.102352941176478.587
936591AD2-074 C
Adder
8.7058823529411787.4
934011AD1-025 C
80/20
4.6114.611
316033AB2-134 GEN
80/20
3.7293.729
3150651CHESTF6
Adder
32.7447058823529427.833
957871AF2-081 C
Adder
17.51647058823529314.889
316274AC1-208 C
Adder
14.04588235294117711.939
3151311EDGECMA
Adder
23.6270588235294120.083
316159AE1-175 C
80/20
0.7120.712
3150771HOPHCF1
80/20
4.324.32
942341AE2-247 C
Adder
2.5964705882352942.207
966621AG1-532 C
Adder
2.1752941176470591.849
940431AE2-027 C
Adder
22.58000000000000219.193
3150681DARBY 2
80/20
4.5764.576
941101AE2-104 C
Adder
5.8423529411764714.966
944581AF1-123 C
Adder
80.2141176470588368.182
316294AC1-161 C
80/20
8.8498.849
957481AF2-042 C
Adder
77.7682352941176466.103
958261AF2-120 C
Adder
9.5447058823529418.113
316382AG1-145 C
80/20
0.6420.642
3143096IRON208
80/20
0.7870.787
316132AB2-190 C
80/20
7.3677.367
939191AE1-149 C
Adder
18.60588235294117615.815
957601AF2-054 C
Adder
3.56235294117647073.028
NYPJM->LTFIMP_NY
CLTF
4.1344.134
LGEELTFEXP_LGEE->PJM
CLTF
3.3563.356
WECLTFEXP_WEC->PJM
CLTF
1.7261.726
CBM West 1LTFEXP_CBM-W1->PJM
CBM
84.27284.272
CBM West 2LTFEXP_CBM-W2->PJM
CBM
48.64648.646
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
9.5619.561
LAGNLTFEXP_LAGN->PJM
CLTF
15.45715.457
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
8.4058.405
CBM South 2LTFEXP_CBM-S2->PJM
CBM
156.686156.686
CPLELTFEXP_CPLE->PJM
CLTF
17.60717.607
TVALTFEXP_TVA->PJM
CLTF
12.412.4
SIGELTFEXP_SIGE->PJM
CLTF
0.620.62

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:100.74 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4100.48
MW Contribution:8.1
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
10.3670588235294128.812
3151221GRAVEL6
80/20
3.8023.802
3151201GRAVEL4
80/20
3.8063.806
3151211GRAVEL5
80/20
3.7583.758
316236AE1-162 C
80/20
0.5280.528
3152331SURRY 2
80/20
40.26840.268
316017AA1-139 ULT1
80/20
1.6281.628
313526AB2-022 C
80/20
0.5630.563
940641AE2-051 C
Adder
23.00823529411764719.557
3150731STONECA
Adder
9.9858823529411778.488
935161AD1-151 C
80/20
23.75423.754
958161AF2-110 C
80/20
2.042.04
938531AE1-072 C
80/20
26.50226.502
933981AD1-022 C
Adder
12.41647058823529510.554
963611AG1-210 C
Adder
0.81058823529411760.689
961611AG1-000B C
80/20
23.84623.846
316072AD1-144 C
80/20
0.4250.425
316375AC2-012 C
80/20
2.0492.049
940541AE2-040 C
Adder
3.7941176470588243.225
940481AE2-033 C
Adder
21.37647058823529618.17
927041AC1-191 C
Adder
13.58823529411764911.55
957831AF2-077 C
80/20
0.4940.494
940551AE2-041 C
Adder
10.3670588235294128.812
961951AG1-038 C
Adder
4.277647058823533.636
3144216WINCHST
80/20
0.2040.204
316316AC1-027 C
80/20
0.4790.479
3152161CUNINGA
80/20
7.9167.916
3152171CUNINGB
80/20
7.9167.916
316169AC1-164 GEN
80/20
63.00863.008
316349AD2-085 C
Adder
5.0752941176470594.314
3151091ELIZAR2
80/20
4.7734.773
946281AF1-292 C
Adder
2.00588235294117641.705
926071AC1-086 C
Adder
27.76352941176470823.599
927021AC1-189 C
Adder
11.1482352941176499.476
316075AC2-137 C
80/20
0.5730.573
3150611CHESTG7
80/20
5.6125.612
316369AC1-216 C
80/20
2.3642.364
3150831SPRUNCA
Adder
10.6141176470588259.022
3150841SPRUNCB
Adder
10.6141176470588259.022
3151081ELIZAR1
80/20
4.8584.858
961941AG1-037 C
Adder
0.69764705882352940.593
941031AE2-094 C
Adder
50.196470588235342.667
934331AD1-057 C
Adder
4.5482352941176483.866
934321AD1-056 C
Adder
8.1541176470588246.931
966871AG1-558 C
Adder
3.3847058823529412.877
964211AG1-282 C
Adder
2.5270588235294122.148
3150601CHESTF5
80/20
92.29692.296
3150631CHESTG8
80/20
5.5225.522
3150621CHESTS7
80/20
2.5762.576
941591AE2-156 C
80/20
27.25627.256
3151101ELIZAR3
80/20
4.9194.919
944591AF1-124 C
80/20
69.53869.538
944601AF1-125 C
80/20
68.22568.225
938771AE1-103 C
Adder
4.2458823529411773.609
960081AF2-299 C
Adder
2.4235294117647062.06
944011AF1-069 C
Adder
16.40117647058823613.941
963041AG1-153 C
Adder
7.0223529411764725.969
943461AF1-017 C
Adder
1.99058823529411751.692
316311AC2-079 C
Adder
8.4682352941176487.198
944631AF1-128 C
80/20
57.75157.751
3150921YORKTN3
80/20
186.63186.63
3151191GRAVEL3
80/20
3.7583.758
316018AA1-139 ULT2
80/20
1.6281.628
933291AC2-141 C
80/20
47.32947.329
3152181CUNINGC
80/20
7.9167.916
966661AG1-536 C
Adder
6.96705882352941155.922
316312AB1-027 C
80/20
0.8120.812
3151161SURRY 1
80/20
36.99436.994
3150991CHESPKB
80/20
1.0961.096
939411AE1-173 C
Adder
124.68470588235294105.982
3137643SOCKMAN
Adder
0.93411764705882360.794
962861AG1-135 C
Adder
7.9105882352941186.724
943741AF1-042 C
Adder
3.87058823529411773.29
3150641CHESTS8
80/20
2.8432.843
942001AE2-212 C
Adder
3.01764705882352932.565
934501AD1-074 C
Adder
48.0341176470588340.829
961671AG1-007 C
Adder
1.22941176470588221.045
934621AD1-088 C
Adder
11.2658823529411789.576
316004AC1-112 C
80/20
0.5060.506
944641AF1-129 C
Adder
143.61529411764707122.073
316240AF1-291 C
Adder
3.02705882352941162.573
316036AC1-147 C
80/20
0.5590.559
316305AF2-043 C
80/20
0.5230.523
316321Z2-027 C
80/20
0.5420.542
934521AD1-076 C
Adder
17.4447058823529414.828
934511AD1-075 C
Adder
12.00823529411764810.207
3142296MT RD221
80/20
0.180.18
316263AC1-034 C
Adder
8.5517647058823547.269
936591AD2-074 C
Adder
7.3964705882352946.287
934011AD1-025 C
80/20
3.8313.831
316033AB2-134 GEN
80/20
3.0983.098
3150651CHESTF6
Adder
26.14823529411764722.226
957871AF2-081 C
80/20
15.09215.092
316274AC1-208 C
Adder
11.86588235294117810.086
3151311EDGECMA
Adder
20.00352941176470617.003
316159AE1-175 C
80/20
0.6130.613
942341AE2-247 C
Adder
2.21.87
316246AF1-032 C
80/20
0.4270.427
316388AE2-253 GEN
80/20
2.9612.961
316320Y1-086 C
80/20
0.3290.329
966621AG1-532 C
Adder
1.81764705882352941.545
940431AE2-027 C
Adder
18.18117647058823715.454
916191Z1-068 C
80/20
0.0660.066
941101AE2-104 C
80/20
55
316185AD1-033 C
80/20
1.8591.859
944581AF1-123 C
80/20
69.29269.292
316294AC1-161 C
80/20
7.7077.707
957481AF2-042 C
Adder
64.7188235294117655.011
3152191CUNINGD
80/20
17.70617.706
958261AF2-120 C
Adder
8.16.885
316382AG1-145 C
80/20
0.5540.554
3151171GRAVELC
80/20
1.2921.292
939191AE1-149 C
Adder
15.33294117647058713.033
3150981CHESPKA
80/20
0.6610.661
957601AF2-054 C
Adder
3.03647058823529432.581
NYPJM->LTFIMP_NY
CLTF
3.5973.597
LGEELTFEXP_LGEE->PJM
CLTF
2.952.95
WECLTFEXP_WEC->PJM
CLTF
1.5171.517
CBM West 1LTFEXP_CBM-W1->PJM
CBM
74.17274.172
CBM West 2LTFEXP_CBM-W2->PJM
CBM
42.32542.325
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
8.3698.369
LAGNLTFEXP_LAGN->PJM
CLTF
13.38813.388
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
7.1467.146
CBM South 2LTFEXP_CBM-S2->PJM
CBM
133.887133.887
CPLELTFEXP_CPLE->PJM
CLTF
14.96914.969
TVALTFEXP_TVA->PJM
CLTF
10.74810.748
SIGELTFEXP_SIGE->PJM
CLTF
0.5440.544

Details for 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 581_SRT-S
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:100.26 %
Rating:3220.44 MVA
Rating Type:B
MVA to Mitigate:3228.89
MW Contribution:5.22
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
6.2364705882352955.301
940641AE2-051 C
Adder
13.71529411764705811.658
316336AC2-165 C
Adder
7.7411764705882356.58
3150481FOUR RIVERF
80/20
3.5533.553
3150731STONECA
Adder
6.2458823529411775.309
935161AD1-151 C
Adder
14.5176470588235312.34
3150701DARBY 4
80/20
2.3652.365
3142366NRTHEST
80/20
0.1710.171
958161AF2-110 C
Adder
1.19176470588235281.013
938531AE1-072 C
Adder
15.30823529411764713.012
933981AD1-022 C
Adder
7.3258823529411776.227
315051AA1-145 CT1
80/20
4.7034.703
963611AG1-210 C
Adder
0.53882352941176470.458
961611AG1-000B C
Adder
14.23176470588235412.097
940541AE2-040 C
Adder
2.33294117647058831.983
940481AE2-033 C
Adder
13.13529411764705811.165
927041AC1-191 C
80/20
8.8178.817
3150371LDYSMT1
80/20
4.2494.249
961951AG1-038 C
Adder
2.7117647058823532.305
3150431FOUR RIVERA
80/20
2.9522.952
316169AC1-164 GEN
80/20
36.80636.806
316349AD2-085 C
Adder
3.0105882352941182.559
946281AF1-292 C
Adder
1.23176470588235291.047
926071AC1-086 C
Adder
16.83294117647058714.308
939261AE1-157 C
80/20
13.3213.32
316075AC2-137 C
80/20
0.3470.347
3150611CHESTG7
80/20
3.5173.517
3150831SPRUNCA
Adder
8.2188235294117656.986
3150841SPRUNCB
80/20
8.2198.219
961941AG1-037 C
Adder
0.41529411764705880.353
941031AE2-094 C
Adder
30.39411764705882425.835
966871AG1-558 C
80/20
2.1962.196
3150391LDYSMT3
80/20
4.4174.417
964211AG1-282 C
Adder
1.65294117647058841.405
3150601CHESTF5
80/20
57.83757.837
3150631CHESTG8
80/20
3.4613.461
3150621CHESTS7
80/20
1.6141.614
941591AE2-156 C
Adder
15.7305882352941213.371
944591AF1-124 C
Adder
39.9505882352941233.958
944601AF1-125 C
Adder
39.1964705882352933.317
938771AE1-103 C
Adder
2.5011764705882352.126
960081AF2-299 C
Adder
1.48823529411764691.265
944011AF1-069 C
Adder
9.9305882352941198.441
963041AG1-153 C
Adder
4.2658823529411763.626
966881AG1-559 C
80/20
2.2882.288
940551AE2-041 C
Adder
6.2364705882352955.301
3150691DARBY 3
80/20
2.3622.362
943461AF1-017 C
Adder
1.18117647058823531.004
316311AC2-079 C
Adder
5.0141176470588234.262
316233AE1-074 C
Adder
2.1552941176470591.832
3150381LDYSMT2
80/20
4.3034.303
944631AF1-128 C
80/20
36.1936.19
3150921YORKTN3
Adder
107.0694117647058991.009
3150851SPRUNCC
80/20
0.1470.147
933291AC2-141 C
Adder
26.7822.763
3150471FOUR RIVERE
80/20
2.9092.909
315052AA1-145 CT2
80/20
4.74.7
3152251N ANNA1
80/20
26.07926.079
966661AG1-536 C
Adder
4.4905882352941183.817
316312AB1-027 C
80/20
0.4890.489
939411AE1-173 C
Adder
73.6611764705882562.612
3137643SOCKMAN
Adder
0.56941176470588240.484
3150451FOUR RIVERC
80/20
3.6073.607
962861AG1-135 C
Adder
5.0788235294117654.317
943741AF1-042 C
Adder
2.45411764705882352.086
3150641CHESTS8
80/20
1.7811.781
3150671DARBY 1
80/20
2.3512.351
942001AE2-212 C
Adder
1.92117647058823531.633
934501AD1-074 C
Adder
28.28352941176470724.041
934621AD1-088 C
Adder
7.1611764705882356.087
316004AC1-112 C
80/20
0.3050.305
944641AF1-129 C
Adder
92.5282352941176578.649
316240AF1-291 C
Adder
1.94470588235294131.653
934521AD1-076 C
Adder
10.2717647058823538.731
934511AD1-075 C
Adder
7.0705882352941176.01
3142296MT RD221
80/20
0.1140.114
3150411LDYSMT5
80/20
4.4394.439
936591AD2-074 C
Adder
4.6894117647058823.986
3150651CHESTF6
Adder
16.84705882352941214.32
3150861SPRUNCD
80/20
0.1470.147
957871AF2-081 C
Adder
8.7129411764705887.406
3150461FOUR RIVERD
80/20
2.9092.909
3150441FOUR RIVERB
80/20
2.9522.952
942341AE2-247 C
Adder
1.30470588235294121.109
966621AG1-532 C
Adder
1.1164705882352940.949
3152261N ANNA2
80/20
26.0926.09
940431AE2-027 C
Adder
11.5988235294117659.859
3150681DARBY 2
80/20
2.3542.354
941101AE2-104 C
Adder
2.92000000000000042.482
944581AF1-123 C
Adder
39.80941176470588533.838
957481AF2-042 C
Adder
40.39647058823529634.337
3150401LDYSMT4
80/20
4.4254.425
958261AF2-120 C
Adder
5.2200000000000014.437
3143096IRON208
80/20
0.4040.404
939191AE1-149 C
Adder
9.4788235294117668.057
957601AF2-054 C
Adder
1.83764705882352961.562
NYPJM->LTFIMP_NY
CLTF
2.8322.832
LGEELTFEXP_LGEE->PJM
CLTF
1.8211.821
WECLTFEXP_WEC->PJM
CLTF
0.9380.938
CBM West 1LTFEXP_CBM-W1->PJM
CBM
45.86545.865
CBM West 2LTFEXP_CBM-W2->PJM
CBM
25.97725.977
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
5.1595.159
LAGNLTFEXP_LAGN->PJM
CLTF
8.1928.192
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
4.3484.348
CBM South 2LTFEXP_CBM-S2->PJM
CBM
81.51781.517
CPLELTFEXP_CPLE->PJM
CLTF
9.1099.109
TVALTFEXP_TVA->PJM
CLTF
6.5746.574
SIGELTFEXP_SIGE->PJM
CLTF
0.3350.335

Details for 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 581_SRT-S
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:113.93 %
Rating:3220.44 MVA
Rating Type:B
MVA to Mitigate:3669.13
MW Contribution:6.55
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
7.6152941176470596.473
3152331SURRY 2
80/20
27.86527.865
940641AE2-051 C
80/20
18.8818.88
316336AC2-165 C
Adder
10.1788235294117648.652
3150731STONECA
80/20
7.7657.765
935161AD1-151 C
Adder
18.16235294117647215.438
3142366NRTHEST
80/20
0.2040.204
958161AF2-110 C
Adder
1.53294117647058831.303
938531AE1-072 C
Adder
19.70000000000000316.745
933981AD1-022 C
Adder
9.4470588235294128.03
963611AG1-210 C
Adder
0.68235294117647060.58
961611AG1-000B C
Adder
17.92352941176470415.235
316375AC2-012 C
80/20
1.521.52
940541AE2-040 C
Adder
3.10117647058823562.636
940481AE2-033 C
Adder
17.43882352941176714.823
927041AC1-191 C
Adder
10.2870588235294128.744
940551AE2-041 C
Adder
7.6152941176470596.473
943461AF1-017 C
Adder
1.51764705882352961.29
316311AC2-079 C
Adder
6.4458823529411775.479
316233AE1-074 C
80/20
2.8742.874
961951AG1-038 C
Adder
3.3858823529411772.878
3150791HOPHCF3
80/20
2.7332.733
3138533PONTONDP
Adder
0.63647058823529420.541
316254AC1-120 C
Adder
-6.376470588235295-5.42
316257AC1-043 C
Adder
-6.121176470588236-5.203
316169AC1-164 GEN
Adder
43.66588235294117537.116
316349AD2-085 C
Adder
3.87058823529411773.29
3151091ELIZAR2
80/20
3.5383.538
946281AF1-292 C
Adder
1.61647058823529431.374
926071AC1-086 C
Adder
21.9611764705882418.667
927021AC1-189 C
Adder
8.6023529411764727.312
964241AG1-285 C
Adder
12.1610.336
962561AG1-105 C
Adder
8.5058823529411767.23
939261AE1-157 C
Adder
14.10235294117647211.987
3150801HOPHCF4
80/20
4.1494.149
3150831SPRUNCA
80/20
10.42510.425
3150841SPRUNCB
80/20
10.42510.425
3151081ELIZAR1
80/20
3.6013.601
961941AG1-037 C
Adder
0.53764705882352950.457
941031AE2-094 C
80/20
42.24742.247
934331AD1-057 C
Adder
3.5635294117647063.029
934321AD1-056 C
Adder
6.3870588235294125.429
966871AG1-558 C
Adder
2.56235294117647072.178
958211AF2-115 C
Adder
2.14705882352941171.825
964211AG1-282 C
Adder
2.07882352941176451.767
3150601CHESTF5
Adder
70.4105882352941159.849
941591AE2-156 C
80/20
20.20920.209
3151101ELIZAR3
80/20
3.6473.647
944591AF1-124 C
80/20
51.4651.46
944601AF1-125 C
80/20
50.48850.488
938771AE1-103 C
Adder
3.22705882352941182.743
960081AF2-299 C
Adder
1.95294117647058821.66
944011AF1-069 C
80/20
13.80413.804
963041AG1-153 C
Adder
5.8858823529411765.003
936261AD2-033 C
Adder
12.57294117647058810.687
961791AG1-021 C
Adder
1.71764705882352931.46
966881AG1-559 C
Adder
2.45176470588235332.084
944631AF1-128 C
Adder
44.0564705882352937.448
3150921YORKTN3
Adder
133.0105882352941113.059
3150851SPRUNCC
80/20
0.1870.187
933291AC2-141 C
80/20
34.37234.372
3152251N ANNA1
80/20
56.69756.697
966661AG1-536 C
Adder
5.6341176470588234.789
3150991CHESPKB
80/20
0.8130.813
939411AE1-173 C
80/20
99.71499.714
3137643SOCKMAN
Adder
0.74235294117647070.631
962861AG1-135 C
Adder
6.3647058823529425.41
943741AF1-042 C
Adder
3.06352941176470632.604
942001AE2-212 C
80/20
2.4472.447
934501AD1-074 C
Adder
36.4552941176470630.987
961671AG1-007 C
Adder
0.95176470588235310.809
934621AD1-088 C
Adder
9.6105882352941188.169
946301AF1-294 C
Adder
3.5305882352941183.001
942461AE2-259 C
Adder
9.4035294117647077.993
3150781HOPHCF2
80/20
2.7332.733
3150761HOPPOLC
80/20
1.7191.719
944641AF1-129 C
80/20
115.84115.84
316240AF1-291 C
80/20
2.4442.444
934521AD1-076 C
Adder
13.2411.254
934511AD1-075 C
Adder
9.1141176470588237.747
316263AC1-034 C
Adder
6.6529411764705895.655
959311AF2-222 C
Adder
16.0552941176470613.647
936591AD2-074 C
Adder
5.8552941176470594.977
3150651CHESTF6
80/20
21.09121.091
3150861SPRUNCD
80/20
0.1870.187
957871AF2-081 C
Adder
11.2117647058823529.53
316274AC1-208 C
Adder
9.2835294117647067.891
3151311EDGECMA
Adder
15.55647058823529613.223
3150771HOPHCF1
80/20
2.7332.733
942341AE2-247 C
Adder
1.67764705882352931.426
966621AG1-532 C
Adder
1.46470588235294131.245
3152261N ANNA2
80/20
56.72156.721
934861AD1-115 C
Adder
-3.06-2.601
940431AE2-027 C
80/20
14.61614.616
941101AE2-104 C
Adder
3.75764705882352963.194
944581AF1-123 C
80/20
51.27751.277
316294AC1-161 C
80/20
5.5975.597
957481AF2-042 C
Adder
54.6470588235294146.45
958261AF2-120 C
Adder
6.5505882352941175.568
3143096IRON208
80/20
0.4940.494
939191AE1-149 C
80/20
12.15312.153
964791AG1-342 C
Adder
3.38000000000000032.873
957601AF2-054 C
Adder
2.26000000000000021.921
316303AF2-085
80/20
4.4474.447
NYPJM->LTFIMP_NY
CLTF
2.72.7
LGEELTFEXP_LGEE->PJM
CLTF
1.331.33
WECLTFEXP_WEC->PJM
CLTF
0.6540.654
CBM West 1LTFEXP_CBM-W1->PJM
CBM
30.72830.728
CBM West 2LTFEXP_CBM-W2->PJM
CBM
23.33523.335
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
4.0414.041
LAGNLTFEXP_LAGN->PJM
CLTF
8.0268.026
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
5.4135.413
CBM South 2LTFEXP_CBM-S2->PJM
CBM
96.69496.694
CPLELTFEXP_CPLE->PJM
CLTF
11.35211.352
TVALTFEXP_TVA->PJM
CLTF
6.4156.415
SIGELTFEXP_SIGE->PJM
CLTF
0.2560.256

Details for 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 552_SRT-S
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:111.75 %
Rating:3220.44 MVA
Rating Type:B
MVA to Mitigate:3598.91
MW Contribution:6.41
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
7.4600000000000016.341
3152331SURRY 2
80/20
27.3627.36
940641AE2-051 C
80/20
18.60118.601
316336AC2-165 C
Adder
10.0541176470588228.546
3150731STONECA
Adder
7.6200000000000016.477
935161AD1-151 C
Adder
17.8305882352941215.156
958161AF2-110 C
Adder
1.50705882352941181.281
938531AE1-072 C
Adder
19.36470588235294316.46
933981AD1-022 C
Adder
9.2917647058823527.898
963611AG1-210 C
Adder
0.6682352941176470.568
961611AG1-000B C
Adder
17.60117647058823614.961
316375AC2-012 C
80/20
1.4941.494
940541AE2-040 C
Adder
3.05294117647058852.595
940481AE2-033 C
Adder
17.16588235294117514.591
927041AC1-191 C
Adder
10.0611764705882358.552
961951AG1-038 C
Adder
3.3164705882352942.819
3150791HOPHCF3
80/20
2.6822.682
3138533PONTONDP
Adder
0.62823529411764710.534
316169AC1-164 GEN
Adder
42.76588235294117636.351
316349AD2-085 C
Adder
3.8035294117647063.233
3151091ELIZAR2
80/20
3.4783.478
946281AF1-292 C
Adder
1.5917647058823531.353
926071AC1-086 C
Adder
21.61647058823529518.374
927021AC1-189 C
Adder
8.4670588235294127.197
964241AG1-285 C
Adder
11.9929411764705910.194
962561AG1-105 C
Adder
8.3858823529411777.128
939261AE1-157 C
Adder
13.69647058823529311.642
3150801HOPHCF4
80/20
4.0724.072
3150831SPRUNCA
80/20
10.2410.24
3150841SPRUNCB
80/20
10.2410.24
3151081ELIZAR1
80/20
3.543.54
961941AG1-037 C
Adder
0.52941176470588240.45
941031AE2-094 C
80/20
41.64641.646
934331AD1-057 C
Adder
3.50823529411764762.982
934321AD1-056 C
Adder
6.2882352941176475.345
966871AG1-558 C
Adder
2.50588235294117642.13
958211AF2-115 C
Adder
2.121.802
964211AG1-282 C
Adder
2.03411764705882361.729
3150601CHESTF5
Adder
69.0399999999999958.684
941591AE2-156 C
80/20
19.86319.863
3151101ELIZAR3
80/20
3.5843.584
944591AF1-124 C
80/20
50.58450.584
944601AF1-125 C
80/20
49.62849.628
938771AE1-103 C
Adder
3.17294117647058862.697
960081AF2-299 C
Adder
1.92235294117647061.634
944011AF1-069 C
80/20
13.60713.607
963041AG1-153 C
Adder
5.8023529411764714.932
936261AD2-033 C
Adder
12.40352941176470510.543
961791AG1-021 C
Adder
1.69529411764705881.441
966881AG1-559 C
Adder
2.38352941176470572.026
940551AE2-041 C
Adder
7.4600000000000016.341
943461AF1-017 C
Adder
1.4917647058823531.268
316311AC2-079 C
Adder
6.33529411764705855.385
316233AE1-074 C
80/20
2.8282.828
944631AF1-128 C
Adder
43.236.72
3150921YORKTN3
Adder
130.52823529411765110.949
3150851SPRUNCC
80/20
0.1840.184
933291AC2-141 C
80/20
33.78233.782
3152251N ANNA1
80/20
56.43856.438
966661AG1-536 C
Adder
5.5164705882352944.689
3150991CHESPKB
80/20
0.7990.799
939411AE1-173 C
80/20
98.18998.189
3137643SOCKMAN
Adder
0.73058823529411760.621
962861AG1-135 C
Adder
6.2317647058823535.297
943741AF1-042 C
Adder
3.02.55
942001AE2-212 C
80/20
2.4042.404
934501AD1-074 C
Adder
35.856470588235330.478
961671AG1-007 C
Adder
0.93647058823529420.796
934621AD1-088 C
Adder
9.4776470588235288.056
946301AF1-294 C
Adder
3.48470588235294132.962
942461AE2-259 C
Adder
9.2882352941176467.895
3150781HOPHCF2
80/20
2.6822.682
3150761HOPPOLC
80/20
1.6871.687
944641AF1-129 C
80/20
113.726113.726
316240AF1-291 C
80/20
2.42.4
316036AC1-147 C
80/20
0.4070.407
934521AD1-076 C
Adder
13.02235294117647211.069
934511AD1-075 C
Adder
8.9635294117647057.619
316263AC1-034 C
Adder
6.5505882352941175.568
959311AF2-222 C
Adder
15.84117647058823613.465
936591AD2-074 C
Adder
5.7329411764705894.873
3150651CHESTF6
80/20
20.70720.707
3150861SPRUNCD
80/20
0.1840.184
957871AF2-081 C
Adder
11.0211764705882369.368
316274AC1-208 C
Adder
9.1388235294117657.768
3151311EDGECMA
Adder
15.3152941176470613.018
3150771HOPHCF1
80/20
2.6822.682
942341AE2-247 C
Adder
1.6482352941176471.401
966621AG1-532 C
Adder
1.44235294117647061.226
3152261N ANNA2
80/20
56.46256.462
940431AE2-027 C
80/20
14.35214.352
941101AE2-104 C
Adder
3.69411764705882373.14
944581AF1-123 C
80/20
50.40550.405
316294AC1-161 C
80/20
5.5015.501
957481AF2-042 C
Adder
53.8847058823529445.802
958261AF2-120 C
Adder
6.4129411764705885.451
3143096IRON208
80/20
0.4840.484
939191AE1-149 C
80/20
11.94411.944
3150981CHESPKA
80/20
0.4820.482
964791AG1-342 C
Adder
3.33294117647058872.833
957601AF2-054 C
Adder
2.21411764705882331.882
316303AF2-085
80/20
4.3844.384
NYPJM->LTFIMP_NY
CLTF
2.6642.664
LGEELTFEXP_LGEE->PJM
CLTF
1.3091.309
WECLTFEXP_WEC->PJM
CLTF
0.6440.644
CBM West 1LTFEXP_CBM-W1->PJM
CBM
30.23930.239
CBM West 2LTFEXP_CBM-W2->PJM
CBM
22.97722.977
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
3.9783.978
LAGNLTFEXP_LAGN->PJM
CLTF
7.9047.904
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
5.3325.332
CBM South 2LTFEXP_CBM-S2->PJM
CBM
95.25595.255
CPLELTFEXP_CPLE->PJM
CLTF
11.18311.183
TVALTFEXP_TVA->PJM
CLTF
6.3186.318
SIGELTFEXP_SIGE->PJM
CLTF
0.2520.252

Details for 8OX-8CLIFTON 500.0 kV Ckt 1 line l/o DVP_P7-1: LN 2101-569_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8OX-8CLIFTON 500.0 kV Ckt 1 line
Contingency Name:
DVP_P7-1: LN 2101-569_SRT-S
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:105.43 %
Rating:3144.0 MVA
Rating Type:C
MVA to Mitigate:3314.56
MW Contribution:7.88
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
5.002352941176474.252
926785AC1-164_E
Adder
12.42470588235294210.561
316084AB2-161 E
Adder
3.63882352941176463.093
940641AE2-051 C
Adder
10.3776470588235298.821
926004AC1-076_E
Adder
2.9364705882352942.496
926472AC1-118 E
Adder
0.89058823529411770.757
3150731STONECA
Adder
4.6788235294117653.977
935161AD1-151 C
Adder
10.8658823529411789.236
932046AC2-012 E
Adder
8.5752941176470587.289
958161AF2-110 C
Adder
0.88705882352941180.754
938531AE1-072 C
Adder
11.3870588235294139.679
926486AC1-120 E
Adder
2.38235294117647062.025
963611AG1-210 C
Adder
0.51294117647058820.436
3138116ELKO L286
Adder
0.9552941176470590.812
961611AG1-000B C
Adder
10.6435294117647079.047
940541AE2-040 C
Adder
1.7482352941176471.486
927041AC1-191 C
Adder
6.8811764705882365.849
926740AC1-158 E2
50/50
11.0911.09
3150371LDYSMT1
50/50
3.7683.768
961952AG1-038 E
Adder
3.30470588235294162.809
961951AG1-038 C
Adder
2.3929411764705882.034
925865AC1-065 E
Adder
11.6529411764705889.905
316254AC1-120 C
Adder
4.6235294117647063.93
939262AE1-157 E
50/50
6.1536.153
936582AD2-073 E
Adder
0.85411764705882350.726
316169AC1-164 GEN
Adder
27.6552941176470623.507
930122AB1-027 E
Adder
0.95294117647058830.81
935112AD1-144 E
Adder
0.61764705882352940.525
316349AD2-085 C
Adder
2.24588235294117671.909
944582AF1-123 E
Adder
67.8623529411764757.683
944592AF1-124 E
Adder
68.1082352941176557.892
923832AB2-022 E
Adder
0.80.68
925022AB2-158 E
Adder
3.342.839
316044AC1-158 C1
50/50
4.244.24
966882AG1-559 E
50/50
0.9590.959
316415AF1-147_GEN2
Adder
-5.709411764705882-4.853
939261AE1-157 C
50/50
11.34411.344
957971AF2-091 C
Adder
1.91529411764705881.628
923842AB2-024 E
Adder
1.25176470588235311.064
316076AC2-137 E
Adder
0.91529411764705890.778
3150831SPRUNCA
Adder
6.19058823529411755.262
3150841SPRUNCB
Adder
6.19058823529411755.262
926662AC1-147 E
Adder
0.86705882352941180.737
916192Z1-068 E
Adder
1.22705882352941181.043
957492AF2-043 E
Adder
0.92352941176470590.785
923852AB2-025 E
Adder
0.70705882352941170.601
939412AE1-173 E
Adder
37.00235294117647631.452
941031AE2-094 C
Adder
7.7070588235294126.551
966871AG1-558 C
Adder
1.71411764705882371.457
966872AG1-558 E
Adder
0.86352941176470590.734
316157AD2-030 E
Adder
0.83647058823529410.711
316411AF1-147_GEN1
Adder
-5.709411764705882-4.853
3150391LDYSMT3
50/50
3.9183.918
3150081POSSM6A
50/50
3.7073.707
957191AF2-013 C
Adder
13.7647058823529411.7
964211AG1-282 C
Adder
1.53411764705882361.304
962962AG1-145 E
Adder
0.980.833
3150601CHESTF5
Adder
43.3882352941176536.88
925332AB2-190 E
Adder
5.4447058823529424.628
927226AC1-216 E
Adder
5.19058823529411754.412
936666AD2-085 E
Adder
3.66470588235294153.115
941591AE2-156 C
Adder
11.7164705882352949.959
944591AF1-124 C
Adder
29.74117647058823625.28
944601AF1-125 C
Adder
29.17882352941176524.802
316045AC1-158 C2
50/50
4.244.24
316170AC1-121 C
Adder
1.58823529411764721.35
966881AG1-559 C
50/50
1.9031.903
3150071POSSM 5
Adder
89.4835294117647276.061
964212AG1-282 E
Adder
1.02235294117647070.869
940551AE2-041 C
Adder
5.002352941176474.252
935162AD1-151 E
Adder
7.24470588235294166.158
943461AF1-017 C
Adder
0.88117647058823530.749
932596AC2-079 E
Adder
6.1011764705882365.186
316311AC2-079 C
Adder
3.73882352941176473.178
938532AE1-072 E
Adder
5.9364705882352945.046
3146326AYDLETT TAP
Adder
0.87882352941176480.747
917122Z2-027 E
Adder
0.86470588235294120.735
316233AE1-074 C
Adder
1.6435294117647061.397
927042AC1-191 E
Adder
3.42823529411764752.914
957832AF2-077 E
Adder
0.98235294117647050.835
926739AC1-158 E1
50/50
11.0911.09
3150381LDYSMT2
50/50
3.8173.817
936592AD2-074 E
Adder
6.7505882352941185.738
316160AE1-175 E
Adder
0.80823529411764720.687
944631AF1-128 C
Adder
27.14823529411764723.076
3150921YORKTN3
Adder
80.576470588235368.49
3145256KINGFORK
Adder
0.66470588235294110.565
925522AC1-027 E
Adder
0.79411764705882360.675
941102AE2-104 E
Adder
3.4564705882352942.938
957872AF2-081 E
Adder
2.77764705882352962.361
933291AC2-141 C
Adder
19.89058823529411816.907
926755AC1-161 E
Adder
8.4905882352941177.217
938552AE1-074 E
Adder
0.82823529411764710.704
3152251N ANNA1
50/50
23.21323.213
934782AD1-105 E
Adder
3.91411764705882353.327
316078AC2-138 E
Adder
0.71764705882352940.61
966661AG1-536 C
Adder
4.0682352941176473.458
958262AF2-120 E
Adder
3.15294117647058862.68
939612AE1-191 E
Adder
3.99529411764705873.396
940432AE2-027 E
Adder
5.8152941176470594.943
934012AD1-025 E
Adder
6.725.712
913392Y1-086 E
Adder
1.41764705882352951.205
939411AE1-173 C
Adder
55.50470588235294447.179
957602AF2-054 E
Adder
0.99411764705882360.845
3150091POSSM6B
50/50
3.7073.707
3150331BIRCHWDA
Adder
28.4352941176470624.17
944491AF1-114 C
Adder
5.6352941176470594.79
3141813NORNECK
Adder
0.68235294117647060.58
962861AG1-135 C
Adder
4.57294117647058853.887
943741AF1-042 C
Adder
2.16470588235294151.84
939192AE1-149 E
Adder
4.7364705882352944.026
939312AE1-162 E
Adder
0.94823529411764720.806
942001AE2-212 C
Adder
1.44117647058823551.225
934065AD1-033 E
Adder
3.2670588235294122.777
937226AE2-253 E
Adder
3.79294117647058873.224
939246AE1-155 E
Adder
6.58588235294117655.598
924814AB2-134 E
Adder
8.5035294117647067.228
944641AF1-129 C
Adder
69.2494117647058858.862
316240AF1-291 C
Adder
1.4552941176470591.237
942342AE2-247 E
Adder
1.34470588235294121.143
919152AA1-139 E1
Adder
2.6505882352941182.253
926502AC1-121 E
Adder
0.74705882352941180.635
3150411LDYSMT5
50/50
3.9383.938
957972AF2-091 E
Adder
2.64588235294117662.249
936591AD2-074 C
Adder
4.13764705882352953.517
939602AE1-190 E
Adder
0.99882352941176470.849
3130536PAPERMILL
Adder
4.6305882352941183.936
3150651CHESTF6
Adder
12.60823529411764810.717
946262AF1-291 E
Adder
0.97058823529411760.825
934576AD1-082 E
Adder
2.8988235294117652.464
943612AF1-032 E
Adder
0.60.51
3145506HICKORY
Adder
1.41764705882352951.205
944602AF1-125 E
Adder
66.7976470588235356.778
957871AF2-081 C
Adder
6.4823529411764715.51
933292AC2-141 E
Adder
8.4905882352941177.217
963612AG1-210 E
Adder
0.76823529411764710.653
926412AC1-112 E
Adder
0.77529411764705890.659
943462AF1-017 E
Adder
1.43647058823529421.221
942341AE2-247 C
Adder
0.97294117647058820.827
958162AF2-110 E
Adder
1.4117647058823531.2
919153AA1-139 E2
Adder
2.6505882352941182.253
940642AE2-051 E
Adder
6.9188235294117655.881
3152261N ANNA2
50/50
23.22323.223
966662AG1-536 E
Adder
5.4670588235294124.647
962862AG1-135 E
Adder
3.0482352941176472.591
943742AF1-042 E
Adder
3.5317647058823533.002
934392AD1-063 E
Adder
0.75058823529411770.638
940431AE2-027 C
Adder
8.722352941176477.414
942002AE2-212 E
Adder
0.96117647058823530.817
941101AE2-104 C
Adder
2.17411764705882371.848
944581AF1-123 C
Adder
29.6352941176470625.19
3150401LDYSMT4
50/50
3.9253.925
944492AF1-114 E
Adder
7.7811764705882356.614
958261AF2-120 C
Adder
4.72941176470588154.02
934146AD1-041 E
Adder
2.49764705882352982.123
939191AE1-149 C
Adder
7.1058823529411776.04
3143316POE
Adder
0.89058823529411770.757
901082W1-029 E
Adder
20.48235294117647217.41
957601AF2-054 C
Adder
1.49058823529411751.267
3150181POSSMC2
50/50
0.8240.824
3150101POSSM6S
50/50
5.7795.779
NYPJM->LTFIMP_NY
CLTF
1.9611.961
LGEELTFEXP_LGEE->PJM
CLTF
0.4830.483
WECLTFEXP_WEC->PJM
CLTF
0.2130.213
CBM West 1LTFEXP_CBM-W1->PJM
CBM
9.0499.049
CBM West 2LTFEXP_CBM-W2->PJM
CBM
10.51310.513
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
1.5641.564
LAGNLTFEXP_LAGN->PJM
CLTF
3.8863.886
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
2.9592.959
CBM South 2LTFEXP_CBM-S2->PJM
CBM
52.10752.107
CPLELTFEXP_CPLE->PJM
CLTF
6.2066.206
TVALTFEXP_TVA->PJM
CLTF
3.123.12
O66PJM->LTFIMP_O-066
CMTX_NF
25.38725.387
G-007PJM->LTFIMP_G-007
CMTX_NF
3.9723.972
SIGELTFEXP_SIGE->PJM
CLTF
0.0980.098

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 552_SRT-S
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:119.78 %
Rating:3220.44 MVA
Rating Type:B
MVA to Mitigate:3857.57
MW Contribution:6.4
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
7.4541176470588246.336
3152331SURRY 2
80/20
27.29427.294
940641AE2-051 C
80/20
18.48818.488
316336AC2-165 C
Adder
10.1094117647058828.593
3150731STONECA
80/20
7.6067.606
935161AD1-151 C
Adder
17.79176470588235415.123
3142366NRTHEST
80/20
0.20.2
958161AF2-110 C
Adder
1.50117647058823531.276
938531AE1-072 C
Adder
19.2929411764705916.399
933981AD1-022 C
Adder
9.2505882352941197.863
963611AG1-210 C
Adder
0.66705882352941170.567
961611AG1-000B C
Adder
17.55647058823529614.923
316375AC2-012 C
80/20
1.4881.488
940541AE2-040 C
Adder
3.03764705882352942.582
940481AE2-033 C
Adder
17.08117647058823614.519
927041AC1-191 C
Adder
10.0729411764705888.562
940551AE2-041 C
Adder
7.4541176470588246.336
943461AF1-017 C
Adder
1.48588235294117641.263
316311AC2-079 C
Adder
6.3129411764705885.366
316233AE1-074 C
80/20
2.8192.819
961951AG1-038 C
Adder
3.3117647058823532.815
3150791HOPHCF3
80/20
2.6772.677
3138533PONTONDP
Adder
0.62941176470588240.535
316169AC1-164 GEN
Adder
42.77176470588235436.356
316349AD2-085 C
Adder
3.79058823529411763.222
3151091ELIZAR2
80/20
3.4653.465
946281AF1-292 C
Adder
1.58470588235294121.347
926071AC1-086 C
Adder
21.50823529411764718.282
927021AC1-189 C
Adder
8.4188235294117647.156
964241AG1-285 C
Adder
11.97764705882352810.181
962561AG1-105 C
Adder
8.3588235294117657.105
316044AC1-158 C1
80/20
14.96214.962
939261AE1-157 C
Adder
13.77647058823529511.71
3150801HOPHCF4
80/20
4.0644.064
3150831SPRUNCA
80/20
10.21910.219
3150841SPRUNCB
80/20
10.21910.219
3151081ELIZAR1
80/20
3.5273.527
961941AG1-037 C
Adder
0.52705882352941180.448
941031AE2-094 C
80/20
41.37341.373
934331AD1-057 C
Adder
3.4882352941176472.965
934321AD1-056 C
Adder
6.2529411764705895.315
966871AG1-558 C
Adder
2.50941176470588222.133
958211AF2-115 C
Adder
2.12470588235294141.806
964211AG1-282 C
Adder
2.0317647058823531.727
3150601CHESTF5
Adder
68.9811764705882458.634
941591AE2-156 C
80/20
19.79319.793
3151101ELIZAR3
80/20
3.5723.572
944591AF1-124 C
80/20
50.39950.399
944601AF1-125 C
80/20
49.44749.447
938771AE1-103 C
Adder
3.162.686
960081AF2-299 C
Adder
1.91411764705882351.627
944011AF1-069 C
80/20
13.51813.518
963041AG1-153 C
Adder
5.7647058823529424.9
936261AD2-033 C
Adder
12.4023529411764710.542
961791AG1-021 C
Adder
1.70000000000000021.445
316045AC1-158 C2
80/20
14.96214.962
966881AG1-559 C
Adder
2.3964705882352942.037
944631AF1-128 C
Adder
43.1623529411764736.688
3150921YORKTN3
Adder
130.26705882352942110.727
3150851SPRUNCC
80/20
0.1830.183
933291AC2-141 C
80/20
33.66433.664
3152251N ANNA1
80/20
55.32355.323
966661AG1-536 C
Adder
5.5082352941176484.682
3150991CHESPKB
80/20
0.7960.796
939411AE1-173 C
80/20
97.64897.648
3137643SOCKMAN
Adder
0.72705882352941180.618
962861AG1-135 C
Adder
6.222352941176475.289
943741AF1-042 C
Adder
2.9964705882352942.547
942001AE2-212 C
80/20
2.3972.397
934501AD1-074 C
Adder
35.6976470588235330.343
961671AG1-007 C
Adder
0.9317647058823530.792
934621AD1-088 C
Adder
9.4482352941176488.031
946301AF1-294 C
Adder
3.4941176470588242.97
942461AE2-259 C
Adder
9.347.939
316192AB2-158 C
80/20
2.1182.118
3150781HOPHCF2
80/20
2.6772.677
3150761HOPPOLC
80/20
1.6841.684
944641AF1-129 C
80/20
113.49113.49
316240AF1-291 C
80/20
2.3942.394
934521AD1-076 C
Adder
12.96470588235294111.02
934511AD1-075 C
Adder
8.9247058823529427.586
316263AC1-034 C
Adder
6.5105882352941185.534
959311AF2-222 C
Adder
15.85294117647058913.475
936591AD2-074 C
Adder
5.7258823529411764.867
3150651CHESTF6
80/20
20.66420.664
3150861SPRUNCD
80/20
0.1830.183
957871AF2-081 C
Adder
10.989.333
316274AC1-208 C
Adder
9.0917647058823537.728
3151311EDGECMA
Adder
15.22352941176470512.94
3150771HOPHCF1
80/20
2.6772.677
942341AE2-247 C
Adder
1.64235294117647061.396
966621AG1-532 C
Adder
1.43529411764705881.22
3152261N ANNA2
80/20
55.34655.346
940431AE2-027 C
80/20
14.31814.318
941101AE2-104 C
Adder
3.683.128
944581AF1-123 C
80/20
50.22150.221
316294AC1-161 C
80/20
5.4825.482
957481AF2-042 C
Adder
53.64117647058823545.595
958261AF2-120 C
Adder
6.4035294117647065.443
3143096IRON208
80/20
0.4840.484
939191AE1-149 C
80/20
11.90511.905
964791AG1-342 C
Adder
3.32117647058823542.823
957601AF2-054 C
Adder
2.2117647058823531.88
316164AC1-076_C
80/20
0.9930.993
316303AF2-085
80/20
4.3634.363
NYPJM->LTFIMP_NY
CLTF
2.8062.806
LGEELTFEXP_LGEE->PJM
CLTF
1.2221.222
WECLTFEXP_WEC->PJM
CLTF
0.5950.595
CBM West 1LTFEXP_CBM-W1->PJM
CBM
27.65727.657
CBM West 2LTFEXP_CBM-W2->PJM
CBM
22.08222.082
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
3.7473.747
LAGNLTFEXP_LAGN->PJM
CLTF
7.6777.677
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
5.2865.286
CBM South 2LTFEXP_CBM-S2->PJM
CBM
94.17394.173
CPLELTFEXP_CPLE->PJM
CLTF
11.08811.088
TVALTFEXP_TVA->PJM
CLTF
6.1396.139
SIGELTFEXP_SIGE->PJM
CLTF
0.2370.237

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 581_SRT-S
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:118.71 %
Rating:3220.44 MVA
Rating Type:B
MVA to Mitigate:3823.1
MW Contribution:6.3
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943471AF1-018 C
Adder
7.3364705882352946.236
3152331SURRY 2
80/20
26.86726.867
940641AE2-051 C
80/20
18.21118.211
316336AC2-165 C
Adder
9.9329411764705898.443
3150731STONECA
80/20
7.4877.487
935161AD1-151 C
Adder
17.51294117647058714.886
3142366NRTHEST
80/20
0.1970.197
958161AF2-110 C
Adder
1.47882352941176461.257
938531AE1-072 C
Adder
18.9952941176470616.146
933981AD1-022 C
Adder
9.1070588235294127.741
963611AG1-210 C
Adder
0.65647058823529430.558
961611AG1-000B C
Adder
17.2823529411764714.69
316375AC2-012 C
80/20
1.4651.465
940541AE2-040 C
Adder
2.99176470588235332.543
940481AE2-033 C
Adder
16.8214.297
927041AC1-191 C
Adder
9.9117647058823538.425
961951AG1-038 C
Adder
3.262.771
3150791HOPHCF3
80/20
2.6352.635
3138533PONTONDP
Adder
0.61882352941176480.526
316169AC1-164 GEN
Adder
42.0870588235294135.774
316349AD2-085 C
Adder
3.7317647058823533.172
3151091ELIZAR2
80/20
3.4123.412
946281AF1-292 C
Adder
1.561.326
926071AC1-086 C
Adder
21.1752941176470617.999
927021AC1-189 C
Adder
8.2870588235294127.044
964241AG1-285 C
Adder
11.7810.013
962561AG1-105 C
Adder
8.2235294117647076.99
316044AC1-158 C1
80/20
14.84214.842
939261AE1-157 C
Adder
13.54823529411764811.516
3150801HOPHCF4
80/20
44
3150831SPRUNCA
80/20
10.0610.06
3150841SPRUNCB
80/20
10.0610.06
3151081ELIZAR1
80/20
3.4733.473
961941AG1-037 C
Adder
0.51882352941176470.441
941031AE2-094 C
80/20
40.75440.754
934331AD1-057 C
Adder
3.43411764705882352.919
934321AD1-056 C
Adder
6.1552941176470595.232
966871AG1-558 C
Adder
2.4682352941176472.098
958211AF2-115 C
Adder
2.0882352941176471.775
964211AG1-282 C
Adder
2.01.7
3150601CHESTF5
Adder
67.8894117647058857.706
941591AE2-156 C
80/20
19.48719.487
3151101ELIZAR3
80/20
3.5173.517
944591AF1-124 C
80/20
49.62249.622
944601AF1-125 C
80/20
48.68548.685
938771AE1-103 C
Adder
3.1117647058823532.645
960081AF2-299 C
Adder
1.88470588235294121.602
944011AF1-069 C
80/20
13.31613.316
963041AG1-153 C
Adder
5.67764705882352954.826
936261AD2-033 C
Adder
12.19529411764705910.366
961791AG1-021 C
Adder
1.67058823529411771.42
316045AC1-158 C2
80/20
14.84214.842
966881AG1-559 C
Adder
2.3564705882352942.003
940551AE2-041 C
Adder
7.3364705882352946.236
943461AF1-017 C
Adder
1.4635294117647061.244
316311AC2-079 C
Adder
6.2152941176470595.283
316233AE1-074 C
80/20
2.7762.776
944631AF1-128 C
Adder
42.4788235294117636.107
3150921YORKTN3
Adder
128.2270588235294108.993
3150851SPRUNCC
80/20
0.180.18
933291AC2-141 C
80/20
33.14533.145
3152251N ANNA1
80/20
54.66754.667
966661AG1-536 C
Adder
5.4223529411764714.609
3150991CHESPKB
80/20
0.7840.784
939411AE1-173 C
80/20
96.17696.176
3137643SOCKMAN
Adder
0.71647058823529410.609
962861AG1-135 C
Adder
6.1258823529411775.207
943741AF1-042 C
Adder
2.94941176470588262.507
942001AE2-212 C
80/20
2.362.36
934501AD1-074 C
Adder
35.143529411764729.872
961671AG1-007 C
Adder
0.91647058823529410.779
934621AD1-088 C
Adder
9.2976470588235297.903
946301AF1-294 C
Adder
3.43411764705882352.919
942461AE2-259 C
Adder
9.1741176470588237.798
316192AB2-158 C
80/20
2.0492.049
3150781HOPHCF2
80/20
2.6352.635
3150761HOPPOLC
80/20
1.6581.658
944641AF1-129 C
80/20
111.715111.715
316240AF1-291 C
80/20
2.3572.357
934521AD1-076 C
Adder
12.76352941176470610.849
934511AD1-075 C
Adder
8.7858823529411767.468
316263AC1-034 C
Adder
6.4082352941176475.447
959311AF2-222 C
Adder
15.58470588235294213.247
936591AD2-074 C
Adder
5.6364705882352944.791
3150651CHESTF6
80/20
20.3420.34
3150861SPRUNCD
80/20
0.180.18
957871AF2-081 C
Adder
10.8105882352941189.189
316274AC1-208 C
Adder
8.9494117647058827.607
3151311EDGECMA
Adder
14.9847058823529412.737
3150771HOPHCF1
80/20
2.6352.635
942341AE2-247 C
Adder
1.61764705882352941.375
966621AG1-532 C
Adder
1.41294117647058841.201
3152261N ANNA2
80/20
54.6954.69
940431AE2-027 C
80/20
14.09514.095
941101AE2-104 C
Adder
3.6235294117647063.08
944581AF1-123 C
80/20
49.44649.446
316294AC1-161 C
80/20
5.3975.397
957481AF2-042 C
Adder
52.8047058823529444.884
958261AF2-120 C
Adder
6.3035294117647065.358
3143096IRON208
80/20
0.4760.476
939191AE1-149 C
80/20
11.72111.721
964791AG1-342 C
Adder
3.26823529411764732.778
957601AF2-054 C
Adder
2.17647058823529441.85
316303AF2-085
80/20
4.2974.297
NYPJM->LTFIMP_NY
CLTF
2.7522.752
LGEELTFEXP_LGEE->PJM
CLTF
1.1961.196
WECLTFEXP_WEC->PJM
CLTF
0.5820.582
CBM West 1LTFEXP_CBM-W1->PJM
CBM
27.04727.047
CBM West 2LTFEXP_CBM-W2->PJM
CBM
21.66521.665
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
3.6713.671
LAGNLTFEXP_LAGN->PJM
CLTF
7.5387.538
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
5.2015.201
CBM South 2LTFEXP_CBM-S2->PJM
CBM
92.61992.619
CPLELTFEXP_CPLE->PJM
CLTF
10.9110.91
TVALTFEXP_TVA->PJM
CLTF
6.0276.027
SIGELTFEXP_SIGE->PJM
CLTF
0.2320.232

Details for AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:116.08 %
Rating:203.98 MVA
Rating Type:B
MVA to Mitigate:236.78
MW Contribution:37.19
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961951AG1-038 C
80/20
18.89318.893
966661AG1-536 C
80/20
31.98731.987
962861AG1-135 C
80/20
35.98635.986
943741AF1-042 C
80/20
17.09317.093
936591AD2-074 C
80/20
32.66732.667
316404AE1-155 C
80/20
12.57112.571
958261AF2-120 C
80/20
37.18537.185
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004

Details for AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line l/o DVP_P4-2: 65T1021_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 65T1021_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:195.84 %
Rating:249.0 MVA
Rating Type:C
MVA to Mitigate:487.63
MW Contribution:61.98
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961952AG1-038 E
50/50
26.0926.09
961951AG1-038 C
50/50
18.89318.893
936592AD2-074 E
50/50
53.29953.299
966661AG1-536 C
50/50
31.98731.987
958262AF2-120 E
50/50
24.7924.79
962861AG1-135 C
50/50
35.98635.986
943741AF1-042 C
50/50
17.09317.093
939246AE1-155 E
50/50
51.77951.779
936591AD2-074 C
50/50
32.66732.667
966662AG1-536 E
50/50
42.98342.983
962862AG1-135 E
50/50
23.9923.99
943742AF1-042 E
50/50
27.88927.889
316404AE1-155 C
50/50
12.57112.571
958261AF2-120 C
50/50
37.18537.185
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
O66PJM->LTFIMP_O-066
CMTX_NF
0.2670.267
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0420.042
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004

Details for AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:118.26 %
Rating:203.98 MVA
Rating Type:B
MVA to Mitigate:241.23
MW Contribution:37.19
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961951AG1-038 C
80/20
18.89318.893
966661AG1-536 C
80/20
31.98731.987
962861AG1-135 C
80/20
35.98635.986
943741AF1-042 C
80/20
17.09317.093
936591AD2-074 C
80/20
32.66732.667
316404AE1-155 C
80/20
12.57112.571
958261AF2-120 C
80/20
37.18537.185
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
CONTINGENCY 'DVP_P4-2: 574T581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
END
CONTINGENCY 'DVP_P4-2: H1T574_SRT-S'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 1                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
END
CONTINGENCY 'DVP_P4-2: 563T576_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
CONTINGENCY 'DVP_P7-1: LN 2101-569_SRT-S'
 OPEN BRANCH FROM BUS 313712 TO BUS 313716 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL DP  230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314119 CKT 1                /*6VINTHIL TP  230.0 - 6NOKESVL     230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314125 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL     230.0
 OPEN BRANCH FROM BUS 314119 TO BUS 314130 CKT 1                /*6NOKESVL     230.0 - 6BRISTER     230.0
 OPEN BRANCH FROM BUS 314913 TO BUS 314916 CKT 1                /*8LOUDOUN     500.0 - 8MORRSVL     500.0
 OPEN BUS 313712                                                /*6VINTHIL TP  230.0
 OPEN BUS 313716                                                /*6VINTHIL DP  230.0
 OPEN BUS 314119                                                /*6NOKESVL     230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
CONTINGENCY 'DVP_P1-2: LN 65_SRT-SW-E'
 OPEN BRANCH FROM BUS 314181 TO BUS 316399 CKT 1   /*3NORNECK     115.0 - AE1-155 TAP  115.0
END
CONTINGENCY 'DVP_P4-2: 65T1021_SRT-A'
 OPEN BRANCH FROM BUS 313813 TO BUS 314178 CKT 1    /*3OCRAN       115.0 - 3LANCAST     115.0
 OPEN BRANCH FROM BUS 313813 TO BUS 314191 CKT 1    /*3OCRAN       115.0 - 3WHIT STONE  115.0
 OPEN BRANCH FROM BUS 313842 TO BUS 313870 CKT Z1   /*3RAPPAHNCK_1 115.0 - 3RAPPAHNCK   115.0
 OPEN BRANCH FROM BUS 313843 TO BUS 313870 CKT Z1   /*3RAPPAHNCK_2 115.0 - 3RAPPAHNCK   115.0
 OPEN BRANCH FROM BUS 313870 TO BUS 313900 CKT Z1   /*3RAPPAHNCK   115.0 - 3RAPP TR     115.0
 OPEN BRANCH FROM BUS 313870 TO BUS 314191 CKT 1    /*3RAPPAHNCK   115.0 - 3WHIT STONE  115.0
 OPEN BRANCH FROM BUS 313886 TO BUS 314174 CKT 1    /*3GREYSPT     115.0 - 3HARMONY     115.0
 OPEN BRANCH FROM BUS 313900 TO BUS 313886 CKT 1    /*3RAPP TR     115.0 - 3GREYSPT     115.0
 OPEN BRANCH FROM BUS 313900 TO BUS 313886 CKT 2    /*3RAPP TR     115.0 - 3GREYSPT     115.0
 OPEN BRANCH FROM BUS 314178 TO BUS 314400 CKT 1    /*3LANCAST     115.0 - 3LANCA_1     115.0
 OPEN BRANCH FROM BUS 936590 TO BUS 314178 CKT 1    /*AD2-074 TP   115.0 - 3LANCAST     115.0
 OPEN BUS 313813                                    /*3OCRAN       115.0
 OPEN BUS 313842                                    /*3RAPPAHNCK_1 115.0
 OPEN BUS 313843                                    /*3RAPPAHNCK_2 115.0
 OPEN BUS 313886                                    /*3GREYSPT     115.0
 OPEN BUS 314178                                    /*3LANCAST     115.0
 OPEN BUS 314191                                    /*3WHIT STONE  115.0
 OPEN BUS 314400                                    /*3LANCA_1     115.0
END
CONTINGENCY 'DVP_P1-2: LN 65_SRT-SW-A'
 OPEN BRANCH FROM BUS 313813 TO BUS 314178 CKT 1   /*3OCRAN       115.0 - 3LANCAST     115.0
 OPEN BRANCH FROM BUS 313813 TO BUS 314191 CKT 1   /*3OCRAN       115.0 - 3WHIT STONE  115.0
 OPEN BRANCH FROM BUS 313870 TO BUS 314191 CKT 1   /*3RAPPAHNCK   115.0 - 3WHIT STONE  115.0
 OPEN BRANCH FROM BUS 314178 TO BUS 314400 CKT 1   /*3LANCAST     115.0 - 3LANCA_1     115.0
 OPEN BRANCH FROM BUS 936590 TO BUS 314178 CKT 1   /*AD2-074 TP   115.0 - 3LANCAST     115.0
 OPEN BUS 313813                                   /*3OCRAN       115.0
 OPEN BUS 314178                                   /*3LANCAST     115.0
 OPEN BUS 314191                                   /*3WHIT STONE  115.0
 OPEN BUS 314400                                   /*3LANCA_1     115.0
END
314132 to 314163 ckt 1
314163 to 314137 ckt 1
314903 to 314908 ckt 1
314908 to 314911 ckt 1
314911 to 314922 ckt 1
314918 to 314934 ckt 1
314919 to 314904 ckt 1
314934 to 314916 ckt 1
936590 to 314178 ckt 1
316399 to 314181 ckt 1

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1DVP
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 1 transformer
DVP_P1-3: 6NORNECK-TX#6_SRT-A
OPAC200.74 %179.92B361.1838.39
GD1DVP
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 1 transformer
Base Case
OPAC110.23 %171.17A188.6719.91
GD1DVP
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer
DVP_P1-3: 6NORNECK-TX#4_SRT-A
OPAC206.3 %177.38B365.9339.93
GD1DVP
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer
Base Case
OPAC123.29 %170.05A209.6623.95
GD1DVP
6AQUI_HARB_B-6GARSVL 230.0 kV Ckt 1 line
DVP_P1-2: LN 2157_SRT-A
OPAC100.58 %898.64B903.817.51
GD1DVP
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
DVP_P1-2: LN 2090_SRT-A
OPAC111.99 %548.02B613.7212.66
GD1DVP
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer
DVP_P1-2: LN 567_SRT-A
OPAC117.56 %934.92B1099.1111.68
GD1DVP
6CHESTF A-6IRON208 230.0 kV Ckt 1 line
DVP_P1-2: LN 557_SRT-S
OPAC119.65 %663.64B794.054.56
GD1DVP
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer
DVP_P1-2: LN 557_SRT-S
OPAC108.08 %879.84B950.896.79
GD1DVP
6FINES-6FREDBRG 230.0 kV Ckt 1 line
DVP_P1-2: LN 2090_SRT-A
OPAC111.92 %548.02B613.3612.66
GD1DVP
6FREDBRG-6CRANES 230.0 kV Ckt 1 line
DVP_P1-2: LN 9296_SRT-A
OPAC103.41 %984.18B1017.758.21
GD1DVP
6IRON208-6SOUWEST 230.0 kV Ckt 1 line
DVP_P1-2: LN 557_SRT-S
OPAC110.61 %663.64B734.044.55
GD1DVP
6LADYSMITH-8LADYSMITH 230.0/500.0 kV Ckt 2 transformer
DVP_P1-2: LN 574_SRT-S_SENS
OPAC103.88 %889.43B923.975.24
GD1DVP
6NRTHEST-6ELMONT 230.0 kV Ckt 1 line
DVP_P1-2: LN 557_SRT-S
OPAC117.46 %678.68B797.165.29
GD1DVP
8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line
DVP_P1-2: LN 563_SRT-S-1
OPAC136.2 %2442.12B3326.1514.45
GD1DVP
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
DVP_P1-2: LN 576_SRT-A
OPAC115.81 %4070.2B4713.5815.68
GD1DVP
8LADYSMITH-8KRAKEN 500.0 kV Ckt 1 line
DVP_P1-2: LN 581_SRT-S
OPAC113.6 %3220.44B3658.5512.37
GD1DVP
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
DVP_P1-2: LN 552_SRT-S
OPAC105.29 %3220.44B3390.969.31
GD1DVP
AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line
DVP_P1-2: LN 2083_SRT-S
OPAC111.39 %203.98B227.219.22

Details for 3NORNECK-6NORNECK 115.0/230.0 kV Ckt 1 transformer l/o DVP_P1-3: 6NORNECK-TX#6_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 1 transformer
Contingency Name:
DVP_P1-3: 6NORNECK-TX#6_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:200.74 %
Rating:179.92 MVA
Rating Type:B
MVA to Mitigate:361.18
MW Contribution:38.39
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 1 transformer
Contingency Name:
DVP_P1-3: 6NORNECK-TX#6_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:185.75 %
Rating:179.92 MVA
Rating Type:B
MVA to Mitigate:334.21
MW Contribution:35.12
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
939612AE1-191 E
50/50
4.0794.079
957602AF2-054 E
50/50
1.281.28
966661AG1-536 C
50/50
19.81219.812
958262AF2-120 E
50/50
15.35415.354
316078AC2-138 E
50/50
44
939602AE1-190 E
50/50
1.021.02
939611AE1-191 C
50/50
0.9820.982
936591AD2-074 C
50/50
16.71516.715
943742AF1-042 E
50/50
14.2714.27
962862AG1-135 E
50/50
14.25414.254
966662AG1-536 E
50/50
26.62226.622
316157AD2-030 E
50/50
1.0781.078
316156AD2-030 C
50/50
0.3440.344
925865AC1-065 E
50/50
9.4969.496
939601AE1-190 C
50/50
0.2430.243
961951AG1-038 C
50/50
9.6679.667
961952AG1-038 E
50/50
13.34913.349
316077AC2-138 C
50/50
0.980.98
936592AD2-074 E
50/50
27.27127.271
3141843SHACKLE
50/50
0.3030.303
316201AC1-065 C
50/50
0.9290.929
934146AD1-041 E
50/50
2.5492.549
957601AF2-054 C
50/50
1.921.92
316404AE1-155 C
50/50
7.8137.813
958261AF2-120 C
50/50
23.03223.032
3150341NORNECKC1
50/50
2.9062.906
943741AF1-042 C
50/50
8.7468.746
962861AG1-135 C
50/50
21.38121.381
3141813NORNECK
50/50
3.8063.806
316280AD1-041 C
50/50
0.6220.622
939246AE1-155 E
50/50
32.07132.071
3150351NORNECKC2
50/50
2.8012.801
963611AG1-210 C
50/50
2.8572.857
963612AG1-210 E
50/50
4.2864.286
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0210.021
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0350.035
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.4570.457
CPLELTFEXP_CPLE->PJM
CLTF
0.0740.074
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0630.063
O66PJM->LTFIMP_O-066
CMTX_NF
0.7060.706
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0330.033
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1110.111
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0740.074
MDUPJM->LTFIMP_MDU
CLTF
0.0030.003
NYPJM->LTFIMP_NY
CLTF
0.0550.055
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0260.026

Details for 3NORNECK-6NORNECK 115.0/230.0 kV Ckt 1 transformer l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 1 transformer
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:110.23 %
Rating:171.17 MVA
Rating Type:A
MVA to Mitigate:188.67
MW Contribution:19.91
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 1 transformer
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:102.28 %
Rating:171.17 MVA
Rating Type:A
MVA to Mitigate:175.07
MW Contribution:18.0
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943741AF1-042 C
50/50
4.5364.536
962861AG1-135 C
50/50
11.08911.089
3141813NORNECK
50/50
1.9741.974
936592AD2-074 E
50/50
14.14514.145
316157AD2-030 E
Adder
0.55882352941176470.475
963611AG1-210 C
50/50
1.4821.482
943742AF1-042 E
50/50
7.4017.401
962862AG1-135 E
50/50
7.3937.393
966662AG1-536 E
50/50
13.80813.808
939612AE1-191 E
Adder
2.11529411764705881.798
957602AF2-054 E
Adder
0.66352941176470580.564
966661AG1-536 C
50/50
10.27610.276
958262AF2-120 E
50/50
7.9647.964
316078AC2-138 E
50/50
2.0752.075
939602AE1-190 E
Adder
0.52941176470588240.45
936591AD2-074 C
50/50
8.6698.669
963612AG1-210 E
50/50
2.2232.223
939246AE1-155 E
50/50
16.63416.634
934146AD1-041 E
Adder
1.32235294117647071.124
957601AF2-054 C
Adder
0.99647058823529410.847
316404AE1-155 C
50/50
4.0524.052
958261AF2-120 C
50/50
11.94611.946
3150341NORNECKC1
50/50
1.5071.507
925865AC1-065 E
Adder
4.9258823529411774.187
961951AG1-038 C
50/50
5.0145.014
961952AG1-038 E
50/50
6.9246.924
316077AC2-138 C
50/50
0.5080.508
3150351NORNECKC2
50/50
1.4531.453
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0110.011
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0180.018
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.2370.237
CPLELTFEXP_CPLE->PJM
CLTF
0.0390.039
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0330.033
O66PJM->LTFIMP_O-066
CMTX_NF
0.3660.366
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0170.017
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0570.057
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0380.038
MDUPJM->LTFIMP_MDU
CLTF
0.0020.002
NYPJM->LTFIMP_NY
CLTF
0.0280.028
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0130.013

Details for 3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer l/o DVP_P1-3: 6NORNECK-TX#4_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer
Contingency Name:
DVP_P1-3: 6NORNECK-TX#4_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:206.3 %
Rating:177.38 MVA
Rating Type:B
MVA to Mitigate:365.93
MW Contribution:39.93
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer
Contingency Name:
DVP_P1-3: 6NORNECK-TX#4_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:189.76 %
Rating:177.38 MVA
Rating Type:B
MVA to Mitigate:336.59
MW Contribution:36.41
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
939612AE1-191 E
50/50
4.2424.242
957602AF2-054 E
50/50
1.3321.332
966661AG1-536 C
50/50
20.60720.607
958262AF2-120 E
50/50
15.9715.97
316078AC2-138 E
50/50
4.164.16
939602AE1-190 E
50/50
1.0611.061
939611AE1-191 C
50/50
1.0221.022
936591AD2-074 C
50/50
17.38517.385
943742AF1-042 E
50/50
14.84214.842
962862AG1-135 E
50/50
14.82514.825
966662AG1-536 E
50/50
27.6927.69
316157AD2-030 E
50/50
1.1211.121
316156AD2-030 C
50/50
0.3580.358
925865AC1-065 E
50/50
9.8779.877
939601AE1-190 C
50/50
0.2530.253
961951AG1-038 C
50/50
10.05410.054
961952AG1-038 E
50/50
13.88513.885
316077AC2-138 C
50/50
1.0191.019
936592AD2-074 E
50/50
28.36528.365
3141843SHACKLE
50/50
0.3150.315
316201AC1-065 C
50/50
0.9660.966
934146AD1-041 E
50/50
2.6512.651
957601AF2-054 C
50/50
1.9971.997
316404AE1-155 C
50/50
8.1268.126
958261AF2-120 C
50/50
23.95523.955
3150341NORNECKC1
50/50
3.0233.023
943741AF1-042 C
50/50
9.0979.097
962861AG1-135 C
50/50
22.23822.238
3141813NORNECK
50/50
3.9583.958
316280AD1-041 C
50/50
0.6470.647
939246AE1-155 E
50/50
33.35733.357
3150351NORNECKC2
50/50
2.9142.914
963611AG1-210 C
50/50
2.9722.972
963612AG1-210 E
50/50
4.4574.457
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0210.021
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0370.037
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.4760.476
CPLELTFEXP_CPLE->PJM
CLTF
0.0770.077
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0660.066
O66PJM->LTFIMP_O-066
CMTX_NF
0.7340.734
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0340.034
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1150.115
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0770.077
MDUPJM->LTFIMP_MDU
CLTF
0.0030.003
NYPJM->LTFIMP_NY
CLTF
0.0570.057
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0270.027

Details for 3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:123.29 %
Rating:170.05 MVA
Rating Type:A
MVA to Mitigate:209.66
MW Contribution:23.95
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:DVP
Facility Description:
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:110.16 %
Rating:170.05 MVA
Rating Type:A
MVA to Mitigate:187.32
MW Contribution:21.65
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943741AF1-042 C
50/50
5.4575.457
962861AG1-135 C
50/50
13.3413.34
3141813NORNECK
50/50
2.3742.374
936592AD2-074 E
50/50
17.01617.016
316157AD2-030 E
50/50
0.6720.672
925865AC1-065 E
Adder
5.9247058823529415.036
961951AG1-038 C
50/50
6.0316.031
961952AG1-038 E
50/50
8.3298.329
316077AC2-138 C
50/50
0.6110.611
963611AG1-210 C
50/50
1.7831.783
943742AF1-042 E
50/50
8.9048.904
962862AG1-135 E
50/50
8.8938.893
966662AG1-536 E
50/50
16.61116.611
939612AE1-191 E
Adder
2.5447058823529412.163
957602AF2-054 E
50/50
0.7990.799
966661AG1-536 C
50/50
12.36212.362
958262AF2-120 E
50/50
9.589.58
316078AC2-138 E
50/50
2.4962.496
939246AE1-155 E
50/50
20.0120.01
939602AE1-190 E
Adder
0.63647058823529420.541
936591AD2-074 C
50/50
10.42910.429
963612AG1-210 E
50/50
2.6742.674
934146AD1-041 E
Adder
1.59058823529411791.352
957601AF2-054 C
50/50
1.1981.198
316404AE1-155 C
50/50
4.8754.875
958261AF2-120 C
50/50
14.3714.37
3150341NORNECKC1
50/50
1.8131.813
3150351NORNECKC2
50/50
1.7481.748
316156AD2-030 C
50/50
0.2150.215
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0130.013
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0220.022
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.2850.285
CPLELTFEXP_CPLE->PJM
CLTF
0.0460.046
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.040.04
O66PJM->LTFIMP_O-066
CMTX_NF
0.440.44
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.020.02
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0690.069
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0460.046
MDUPJM->LTFIMP_MDU
CLTF
0.0020.002
NYPJM->LTFIMP_NY
CLTF
0.0340.034
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0160.016

Details for 6AQUI_HARB_B-6GARSVL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2157_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6AQUI_HARB_B-6GARSVL 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 2157_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.58 %
Rating:898.64 MVA
Rating Type:B
MVA to Mitigate:903.81
MW Contribution:7.51
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6AQUI_HARB_B-6GARSVL 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 2157_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:104.26 %
Rating:898.64 MVA
Rating Type:B
MVA to Mitigate:936.9
MW Contribution:7.25
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943741AF1-042 C
Adder
1.92588235294117661.637
962861AG1-135 C
Adder
4.2882352941176473.645
3141813NORNECK
Adder
0.68588235294117650.583
3150501FOURRIVERG
50/50
3.8763.876
316337AD2-073 C
50/50
0.330.33
944631AF1-128 C
Adder
12.9976470588235311.048
3150921YORKTN3
Adder
37.3682352941176531.763
316160AE1-175 E
Adder
0.38705882352941180.329
936592AD2-074 E
Adder
6.0047058823529415.104
3150411LDYSMT5
50/50
3.8273.827
934782AD1-105 E
50/50
4.5084.508
3150831SPRUNCA
Adder
2.71647058823529442.309
3150841SPRUNCB
Adder
2.71647058823529442.309
316076AC2-137 E
Adder
0.457647058823529460.389
966872AG1-558 E
Adder
0.55058823529411770.468
966871AG1-558 C
Adder
1.09294117647058830.929
923842AB2-024 E
Adder
0.79882352941176480.679
316157AD2-030 E
Adder
0.56941176470588240.484
964211AG1-282 C
Adder
1.47882352941176461.257
957191AF2-013 C
50/50
28.85628.856
3141316ARNOLDS
50/50
0.4410.441
3138116ELKO L286
Adder
0.47764705882352950.406
927041AC1-191 C
Adder
4.3905882352941183.732
3150371LDYSMT1
50/50
3.6633.663
963611AG1-210 C
Adder
0.51411764705882360.437
926785AC1-164_E
Adder
6.33529411764705855.385
943471AF1-018 C
Adder
3.2717647058823532.781
926472AC1-118 E
50/50
1.1911.191
940431AE2-027 C
Adder
3.91411764705882353.327
934392AD1-063 E
Adder
0.490588235294117660.417
943742AF1-042 E
Adder
3.14235294117647032.671
962862AG1-135 E
Adder
2.85882352941176482.43
966662AG1-536 E
Adder
5.2082352941176474.427
944492AF1-114 E
50/50
13.33713.337
940432AE2-027 E
Adder
2.60941176470588232.218
934012AD1-025 E
Adder
2.9611764705882352.517
939612AE1-191 E
Adder
2.66117647058823532.262
957602AF2-054 E
Adder
0.6764705882352940.575
966661AG1-536 C
Adder
3.8752941176470593.294
958262AF2-120 E
Adder
3.0035294117647062.553
316078AC2-138 E
Adder
0.720.612
944491AF1-114 C
50/50
9.6589.658
3150331BIRCHWDA
50/50
68.27168.271
316240AF1-291 C
Adder
0.64117647058823530.545
944641AF1-129 C
Adder
30.7070588235294126.101
946262AF1-291 E
Adder
0.427058823529411770.363
3150651CHESTF6
Adder
5.5905882352941184.752
3130536PAPERMILL
Adder
2.96941176470588262.524
939602AE1-190 E
Adder
0.66588235294117650.566
936591AD2-074 C
Adder
3.683.128
926412AC1-112 E
Adder
0.38941176470588240.331
963612AG1-210 E
Adder
0.7717647058823530.656
934781AD1-105 C
50/50
1.0871.087
3150731STONECA
Adder
2.11764705882352941.8
935161AD1-151 C
Adder
4.8152941176470594.093
935162AD1-151 E
Adder
3.2105882352941182.729
957832AF2-077 E
Adder
0.55882352941176470.475
927042AC1-191 E
Adder
2.18705882352941171.859
940551AE2-041 C
Adder
3.2717647058823532.781
3150381LDYSMT2
50/50
3.713.71
924814AB2-134 E
Adder
3.74588235294117673.184
939246AE1-155 E
Adder
6.2741176470588245.333
957972AF2-091 E
50/50
4.5344.534
934146AD1-041 E
Adder
1.6635294117647061.414
957601AF2-054 C
Adder
1.01411764705882360.862
3150401LDYSMT4
50/50
3.8153.815
958261AF2-120 C
Adder
4.50588235294117643.83
925865AC1-065 E
Adder
7.6305882352941186.486
939262AE1-157 E
Adder
5.3976470588235294.588
961951AG1-038 C
Adder
2.12823529411764721.809
961952AG1-038 E
Adder
2.94000000000000042.499
936582AD2-073 E
50/50
11
316223AC1-118 C
50/50
0.3780.378
930122AB1-027 E
Adder
0.47882352941176470.407
316169AC1-164 GEN
Adder
14.10117647058823611.986
966882AG1-559 E
Adder
0.78705882352941180.669
939261AE1-157 C
Adder
9.9505882352941188.458
3150391LDYSMT3
50/50
3.8083.808
957971AF2-091 C
50/50
3.2843.284
925332AB2-190 E
Adder
2.42470588235294132.061
927226AC1-216 E
Adder
2.2870588235294121.944
3150601CHESTF5
Adder
20.7717647058823517.656
962962AG1-145 E
Adder
0.46941176470588240.399
966881AG1-559 C
Adder
1.56235294117647071.328
964212AG1-282 E
Adder
0.98588235294117640.838
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.8766.876
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.6814.681
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.8480.848
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.061.06
CBM South 2LTFEXP_CBM-S2->PJM
CBM
18.66918.669
CPLELTFEXP_CPLE->PJM
CLTF
2.2232.223
LAGNLTFEXP_LAGN->PJM
CLTF
1.5741.574
TVALTFEXP_TVA->PJM
CLTF
1.2491.249
O66PJM->LTFIMP_O-066
CMTX_NF
9.0369.036
G-007PJM->LTFIMP_G-007
CMTX_NF
1.4221.422
SIGELTFEXP_SIGE->PJM
CLTF
0.0540.054
NYPJM->LTFIMP_NY
CLTF
0.6450.645
LGEELTFEXP_LGEE->PJM
CLTF
0.280.28
WECLTFEXP_WEC->PJM
CLTF
0.1430.143

Details for 6BIRCHWD-6FINES 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2090_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 2090_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:111.99 %
Rating:548.02 MVA
Rating Type:B
MVA to Mitigate:613.72
MW Contribution:12.66
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 2090_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:120.47 %
Rating:548.02 MVA
Rating Type:B
MVA to Mitigate:660.22
MW Contribution:12.01
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
925865AC1-065 E
50/50
9.9089.908
939601AE1-190 C
50/50
0.210.21
961951AG1-038 C
50/50
3.4653.465
961952AG1-038 E
50/50
4.7854.785
316077AC2-138 C
50/50
0.3060.306
936582AD2-073 E
50/50
1.8441.844
316223AC1-118 C
50/50
0.7290.729
936592AD2-074 E
50/50
9.7769.776
316201AC1-065 C
50/50
0.9690.969
934146AD1-041 E
50/50
2.2042.204
957601AF2-054 C
50/50
1.3771.377
316404AE1-155 C
50/50
2.5772.577
958261AF2-120 C
50/50
7.5977.597
3150341NORNECKC1
50/50
0.9060.906
943741AF1-042 C
50/50
3.1353.135
962861AG1-135 C
50/50
7.1767.176
3141813NORNECK
50/50
1.1861.186
316337AD2-073 C
50/50
0.6080.608
316280AD1-041 C
50/50
0.5380.538
939246AE1-155 E
50/50
10.57910.579
957972AF2-091 E
50/50
9.3619.361
3150351NORNECKC2
50/50
0.8730.873
957971AF2-091 C
50/50
6.7796.779
923842AB2-024 E
Adder
1.00941176470588250.858
316157AD2-030 E
50/50
0.7730.773
964211AG1-282 C
50/50
2.5072.507
957191AF2-013 C
50/50
62.06862.068
3141316ARNOLDS
50/50
0.9590.959
957832AF2-077 E
Adder
0.65764705882352950.559
940551AE2-041 C
50/50
4.2554.255
963611AG1-210 C
50/50
0.8910.891
943471AF1-018 C
50/50
4.2554.255
926472AC1-118 E
50/50
2.32.3
316059AD1-063 C
50/50
0.1560.156
963612AG1-210 E
50/50
1.3361.336
934392AD1-063 E
50/50
0.6380.638
943742AF1-042 E
50/50
5.1155.115
962862AG1-135 E
50/50
4.7844.784
966662AG1-536 E
50/50
8.7828.782
944492AF1-114 E
50/50
27.53327.533
3130536PAPERMILL
Adder
3.7752941176470593.209
939602AE1-190 E
50/50
0.8810.881
939612AE1-191 E
50/50
3.5263.526
957602AF2-054 E
50/50
0.9180.918
966661AG1-536 C
50/50
6.5356.535
958262AF2-120 E
50/50
5.0655.065
316078AC2-138 E
50/50
1.2471.247
944491AF1-114 C
50/50
19.93819.938
3150331BIRCHWDA
50/50
150.208150.208
939611AE1-191 C
50/50
0.8490.849
936591AD2-074 C
50/50
5.9925.992
316156AD2-030 C
50/50
0.2470.247
964212AG1-282 E
50/50
1.6711.671
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.7873.787
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.7822.782
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.4850.485
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.7010.701
CBM South 2LTFEXP_CBM-S2->PJM
CBM
12.08512.085
CPLELTFEXP_CPLE->PJM
CLTF
1.471.47
LAGNLTFEXP_LAGN->PJM
CLTF
0.9590.959
TVALTFEXP_TVA->PJM
CLTF
0.7570.757
O66PJM->LTFIMP_O-066
CMTX_NF
4.8694.869
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7660.766
SIGELTFEXP_SIGE->PJM
CLTF
0.030.03
NYPJM->LTFIMP_NY
CLTF
0.3510.351
LGEELTFEXP_LGEE->PJM
CLTF
0.1550.155
WECLTFEXP_WEC->PJM
CLTF
0.0790.079

Details for 6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 567_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer
Contingency Name:
DVP_P1-2: LN 567_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:117.56 %
Rating:934.92 MVA
Rating Type:B
MVA to Mitigate:1099.11
MW Contribution:11.68
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer
Contingency Name:
DVP_P1-2: LN 567_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:123.89 %
Rating:934.92 MVA
Rating Type:B
MVA to Mitigate:1158.26
MW Contribution:11.79
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
941591AE2-156 C
Adder
10.929411764705889.29
925332AB2-190 E
Adder
5.91411764705882355.027
944591AF1-124 C
Adder
27.26470588235294223.175
944601AF1-125 C
Adder
26.7494117647058822.737
927226AC1-216 E
Adder
5.5894117647058834.751
3150601CHESTF5
Adder
61.6852.428
936666AD2-085 E
Adder
3.34117647058823542.84
962962AG1-145 E
50/50
1.5371.537
938771AE1-103 C
Adder
1.63411764705882371.389
316156AD2-030 C
50/50
0.4250.425
316075AC2-137 C
50/50
0.4510.451
925865AC1-065 E
50/50
18.90818.908
939601AE1-190 C
50/50
0.3840.384
961951AG1-038 C
50/50
3.6043.604
961952AG1-038 E
50/50
4.9774.977
936582AD2-073 E
Adder
1.1482352941176470.976
926755AC1-161 E
Adder
7.7070588235294126.551
933291AC2-141 C
Adder
18.0552941176470615.347
925522AC1-027 E
Adder
0.73647058823529410.626
944631AF1-128 C
Adder
38.5941176470588232.805
957872AF2-081 E
Adder
2.5458823529411772.164
3145256KINGFORK
Adder
0.64941176470588250.552
3150921YORKTN3
Adder
101.5176470588235486.29
316160AE1-175 E
50/50
1.2681.268
941102AE2-104 E
Adder
3.1717647058823532.696
936592AD2-074 E
50/50
10.16810.168
3143316POE
Adder
0.72470588235294120.616
939191AE1-149 C
Adder
6.3788235294117655.422
316159AE1-175 C
50/50
0.4180.418
901082W1-029 E
Adder
18.5929411764705915.804
3141843SHACKLE
50/50
0.6030.603
316201AC1-065 C
50/50
1.8491.849
934146AD1-041 E
50/50
4.0174.017
957601AF2-054 C
50/50
2.372.37
316404AE1-155 C
50/50
2.3762.376
958261AF2-120 C
50/50
7.0057.005
942001AE2-212 C
Adder
1.18941176470588221.011
939192AE1-149 E
Adder
4.2529411764705883.615
934065AD1-033 E
Adder
3.0082352941176472.557
939312AE1-162 E
Adder
0.95764705882352940.814
937226AE2-253 E
Adder
3.48117647058823552.959
924517AB2-100 E2
Adder
1.31411764705882361.117
934501AD1-074 C
Adder
17.7847058823529415.117
943741AF1-042 C
50/50
3.2613.261
962861AG1-135 C
50/50
6.7996.799
3141813NORNECK
Adder
0.99176470588235290.843
316240AF1-291 C
Adder
1.21647058823529421.034
944641AF1-129 C
Adder
58.0164705882352949.314
924814AB2-134 E
Adder
9.155294117647067.782
919152AA1-139 E1
Adder
2.4294117647058822.065
942342AE2-247 E
Adder
1.22588235294117661.042
316280AD1-041 C
50/50
0.9810.981
920042AA2-088 E OP
Adder
5.4247058823529414.611
934511AD1-075 C
Adder
4.4458823529411773.779
934521AD1-076 C
Adder
6.4588235294117655.49
939246AE1-155 E
50/50
9.7559.755
919692AA2-053 E OP
Adder
1.9247058823529411.636
957972AF2-091 E
Adder
2.38117647058823542.024
944582AF1-123 E
Adder
62.2117647058823652.88
944592AF1-124 E
Adder
62.43647058823529553.071
935112AD1-144 E
Adder
0.60235294117647060.512
316349AD2-085 C
Adder
2.0482352941176471.741
930122AB1-027 E
Adder
1.1682352941176470.993
316169AC1-164 GEN
50/50
59.62859.628
923832AB2-022 E
Adder
0.72941176470588230.62
316314AB2-024 C
50/50
0.3640.364
938772AE1-103 E
Adder
2.25764705882352961.919
916042Z1-036 E
Adder
16.12117647058823513.703
926071AC1-086 C
Adder
9.502352941176478.077
957971AF2-091 C
Adder
1.7247058823529411.466
3150831SPRUNCA
Adder
4.643.944
3150841SPRUNCB
Adder
4.643.944
939412AE1-173 E
Adder
28.724.395
926662AC1-147 E
Adder
0.80941176470588230.688
916192Z1-068 E
Adder
1.13647058823529410.966
316076AC2-137 E
50/50
1.5851.585
957492AF2-043 E
Adder
0.85647058823529410.728
923852AB2-025 E
Adder
0.53647058823529410.456
923842AB2-024 E
50/50
2.2272.227
316157AD2-030 E
50/50
1.331.33
964211AG1-282 C
50/50
2.3232.323
961941AG1-037 C
Adder
0.250588235294117670.213
961942AG1-037 E
Adder
0.167058823529411760.142
957191AF2-013 C
Adder
8.1011764705882366.886
935162AD1-151 E
Adder
7.837647058823536.662
938532AE1-072 E
Adder
5.4352941176470594.62
3146326AYDLETT TAP
Adder
0.80352941176470590.683
943461AF1-017 C
Adder
0.80352941176470590.683
316311AC2-079 C
Adder
3.4117647058823532.9
932596AC2-079 E
Adder
5.5670588235294124.732
917122Z2-027 E
Adder
0.78588235294117660.668
957832AF2-077 E
Adder
1.39411764705882371.185
940551AE2-041 C
50/50
8.5438.543
920692AA2-178 E
Adder
2.23411764705882381.899
961611AG1-000B C
Adder
11.3023529411764719.607
3138116ELKO L286
50/50
1.6531.653
940541AE2-040 C
Adder
1.32705882352941161.128
940482AE2-033 E
Adder
5.0317647058823534.277
940481AE2-033 C
Adder
7.4635294117647066.344
963611AG1-210 C
Adder
0.74470588235294120.633
923263AB1-132 E OP
Adder
2.76588235294117672.351
940641AE2-051 C
Adder
7.5435294117647066.412
316084AB2-161 E
Adder
3.2882352941176472.795
926785AC1-164_E
50/50
26.78926.789
943471AF1-018 C
50/50
8.5438.543
3145946PLYMOUTH TP
Adder
0.171764705882352930.146
933982AD1-022 E
Adder
2.48823529411764752.115
926472AC1-118 E
Adder
1.07411764705882360.913
3150731STONECA
Adder
5.1505882352941184.378
932046AC2-012 E
Adder
8.0047058823529426.804
935161AD1-151 C
Adder
11.755294117647069.992
938531AE1-072 C
Adder
10.4258823529411768.862
958161AF2-110 C
Adder
0.81411764705882350.692
316059AD1-063 C
50/50
0.3140.314
3145393UNCAMP
Adder
3.34588235294117632.844
933981AD1-022 C
Adder
4.5705882352941173.885
900672V4-068 E
Adder
0.178823529411764710.152
940642AE2-051 E
Adder
5.0282352941176474.274
919153AA1-139 E2
Adder
2.4294117647058822.065
943462AF1-017 E
Adder
1.31058823529411781.114
942341AE2-247 C
Adder
0.88823529411764710.755
316382AG1-145 C
50/50
0.3770.377
926412AC1-112 E
Adder
0.95058823529411770.808
958162AF2-110 E
Adder
1.29411764705882361.1
924516AB2-100 E1
Adder
1.31411764705882361.117
934512AD1-075 E
Adder
2.2635294117647061.924
934502AD1-074 E
Adder
9.0529411764705887.695
918512AA1-065 E OP
Adder
2.78823529411764742.37
963612AG1-210 E
Adder
1.11764705882352940.95
942002AE2-212 E
Adder
0.79294117647058830.674
940431AE2-027 C
Adder
8.0564705882352946.848
944581AF1-123 C
Adder
27.16823529411764723.093
941101AE2-104 C
Adder
1.99529411764705891.696
934392AD1-063 E
50/50
1.2811.281
943742AF1-042 E
50/50
5.3215.321
962862AG1-135 E
50/50
4.5334.533
966662AG1-536 E
50/50
8.0978.097
316141AB2-099 E
Adder
0.124705882352941180.106
944492AF1-114 E
Adder
7.0035294117647065.953
933292AC2-141 E
Adder
7.7070588235294126.551
946262AF1-291 E
Adder
0.81058823529411760.689
3150651CHESTF6
Adder
10.5635294117647058.979
944602AF1-125 E
Adder
61.2352941176470652.05
3145506HICKORY
Adder
1.3035294117647061.108
934576AD1-082 E
Adder
2.622.227
957871AF2-081 C
Adder
5.94117647058823555.05
943612AF1-032 E
Adder
0.5564705882352940.473
3130536PAPERMILL
50/50
8.178.17
939602AE1-190 E
50/50
1.6071.607
939611AE1-191 C
50/50
1.5481.548
940492AE2-034 E
Adder
1.67529411764705881.424
934522AD1-076 E
Adder
3.2917647058823532.798
936591AD2-074 C
50/50
6.2326.232
943172AE2-346 E
Adder
0.30.255
918492AA1-063AE OP
Adder
1.9235294117647061.635
917332KELFORD E
Adder
0.78588235294117660.668
925122AB2-169 E
Adder
2.8305882352941182.406
939411AE1-173 C
Adder
43.0494117647058836.592
940432AE2-027 E
Adder
5.3717647058823534.566
934012AD1-025 E
Adder
7.2364705882352946.151
913392Y1-086 E
Adder
1.29176470588235311.098
939612AE1-191 E
50/50
6.4276.427
957602AF2-054 E
50/50
1.581.58
966661AG1-536 C
50/50
6.0266.026
958262AF2-120 E
50/50
4.674.67
316078AC2-138 E
Adder
1.04235294117647070.886
944491AF1-114 C
Adder
5.0717647058823534.311
3145413WATKINS
Adder
0.371764705882352940.316
964212AG1-282 E
50/50
1.5491.549
926072AC1-086 E
Adder
4.3247058823529423.676
CBM West 1LTFEXP_CBM-W1->PJM
CBM
1.0931.093
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.8973.897
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.4280.428
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.8251.825
CBM South 2LTFEXP_CBM-S2->PJM
CBM
29.11329.113
CPLELTFEXP_CPLE->PJM
CLTF
3.8353.835
LAGNLTFEXP_LAGN->PJM
CLTF
1.6451.645
TVALTFEXP_TVA->PJM
CLTF
1.2591.259
O66PJM->LTFIMP_O-066
CMTX_NF
7.1797.179
G-007PJM->LTFIMP_G-007
CMTX_NF
1.1231.123
SIGELTFEXP_SIGE->PJM
CLTF
0.0210.021
NYPJM->LTFIMP_NY
CLTF
0.5590.559
LGEELTFEXP_LGEE->PJM
CLTF
0.0680.068
WECLTFEXP_WEC->PJM
CLTF
0.0320.032

Details for 6CHESTF A-6IRON208 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6CHESTF A-6IRON208 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 557_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:119.65 %
Rating:663.64 MVA
Rating Type:B
MVA to Mitigate:794.05
MW Contribution:4.56
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:DVP
Facility Description:
6CHESTF A-6IRON208 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 557_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:118.19 %
Rating:663.64 MVA
Rating Type:B
MVA to Mitigate:784.36
MW Contribution:4.5
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
3150621CHESTS7
50/50
2.2342.234
3150611CHESTG7
50/50
4.8674.867
925865AC1-065 E
Adder
7.5929411764705886.454
961951AG1-038 C
Adder
1.42000000000000021.207
961952AG1-038 E
Adder
1.96117647058823531.667
936582AD2-073 E
Adder
0.43647058823529410.371
926755AC1-161 E
Adder
3.96117647058823553.367
933291AC2-141 C
Adder
9.287.888
3150761HOPPOLC
50/50
1.0381.038
925522AC1-027 E
Adder
0.402352941176470640.342
944631AF1-128 C
50/50
49.90849.908
957872AF2-081 E
Adder
1.36705882352941171.162
3145256KINGFORK
Adder
0.360.306
3150921YORKTN3
Adder
49.1152941176470641.748
316160AE1-175 E
Adder
0.54352941176470590.462
941102AE2-104 E
Adder
1.72117647058823551.463
936592AD2-074 E
Adder
4.00705882352941253.406
939191AE1-149 C
Adder
3.84235294117647053.266
934011AD1-025 C
50/50
1.4651.465
316033AB2-134 GEN
50/50
1.1851.185
901082W1-029 E
Adder
9.9247058823529428.436
934146AD1-041 E
Adder
1.621.377
957601AF2-054 C
Adder
0.96117647058823530.817
924814AB2-134 E
50/50
7.137.13
3150641CHESTS8
50/50
2.4652.465
919152AA1-139 E1
Adder
1.30470588235294121.109
942342AE2-247 E
Adder
0.68588235294117650.583
939246AE1-155 E
Adder
3.80823529411764743.237
939192AE1-149 E
Adder
2.56235294117647072.178
3150781HOPHCF2
50/50
1.6511.651
934065AD1-033 E
Adder
1.62117647058823521.378
939312AE1-162 E
Adder
0.60.51
937226AE2-253 E
Adder
1.86941176470588231.589
943741AF1-042 C
Adder
1.28470588235294141.092
962861AG1-135 C
Adder
2.66117647058823532.262
3141813NORNECK
Adder
0.38352941176470590.326
944582AF1-123 E
Adder
33.4682352941176528.448
944592AF1-124 E
Adder
33.5894117647058828.551
3150631CHESTG8
50/50
4.7894.789
935112AD1-144 E
Adder
0.33411764705882350.284
316349AD2-085 C
Adder
1.14470588235294120.973
316169AC1-164 GEN
50/50
22.41822.418
923832AB2-022 E
Adder
0.39058823529411770.332
938772AE1-103 E
Adder
1.19411764705882351.015
916042Z1-036 E
Adder
8.517647058823537.24
3150801HOPHCF4
50/50
2.5062.506
3150791HOPHCF3
50/50
1.6511.651
926662AC1-147 E
Adder
0.44705882352941180.38
916192Z1-068 E
Adder
0.620.527
316369AC1-216 C
50/50
0.9040.904
316076AC2-137 E
Adder
0.52823529411764710.449
957492AF2-043 E
Adder
0.46117647058823530.392
923842AB2-024 E
Adder
0.87294117647058820.742
316157AD2-030 E
Adder
0.53882352941176470.458
964211AG1-282 C
Adder
0.89529411764705890.761
935162AD1-151 E
50/50
6.3216.321
938532AE1-072 E
Adder
2.9164705882352942.479
3146326AYDLETT TAP
Adder
0.431764705882352940.367
943461AF1-017 C
Adder
0.44941176470588240.382
316311AC2-079 C
Adder
1.90117647058823551.616
932596AC2-079 E
Adder
3.10117647058823562.636
917122Z2-027 E
Adder
0.420.357
957832AF2-077 E
Adder
0.61529411764705890.523
940551AE2-041 C
Adder
3.3882352941176472.88
961611AG1-000B C
Adder
7.877647058823536.696
3138116ELKO L286
Adder
0.55176470588235290.469
963611AG1-210 C
Adder
0.288235294117647030.245
316084AB2-161 E
Adder
1.92235294117647061.634
926785AC1-164_E
50/50
10.07210.072
943471AF1-018 C
Adder
3.3882352941176472.88
926472AC1-118 E
Adder
0.40352941176470590.343
3150731STONECA
50/50
4.6744.674
932046AC2-012 E
Adder
4.42705882352941153.763
935161AD1-151 C
50/50
9.4829.482
938531AE1-072 C
Adder
5.5941176470588234.755
958161AF2-110 C
Adder
0.44117647058823530.375
3145393UNCAMP
Adder
1.761.496
316132AB2-190 C
50/50
2.5252.525
919153AA1-139 E2
Adder
1.30470588235294121.109
943462AF1-017 E
Adder
0.73294117647058820.623
942341AE2-247 C
Adder
0.49647058823529410.422
958162AF2-110 E
Adder
0.70235294117647060.597
963612AG1-210 E
Adder
0.43294117647058820.368
940431AE2-027 C
Adder
3.98470588235294133.387
3150771HOPHCF1
50/50
1.6511.651
944581AF1-123 C
Adder
14.61529411764705912.423
941101AE2-104 C
Adder
1.08235294117647070.92
934392AD1-063 E
Adder
0.50823529411764710.432
943742AF1-042 E
Adder
2.09647058823529431.782
962862AG1-135 E
Adder
1.77411764705882361.508
966662AG1-536 E
Adder
3.16117647058823532.687
940432AE2-027 E
Adder
2.65647058823529442.258
934012AD1-025 E
50/50
5.6355.635
913392Y1-086 E
Adder
0.6917647058823530.588
939612AE1-191 E
Adder
2.5917647058823532.203
957602AF2-054 E
Adder
0.64117647058823530.545
966661AG1-536 C
Adder
2.35294117647058832
958262AF2-120 E
Adder
1.8235294117647061.55
316078AC2-138 E
Adder
0.40352941176470590.343
933292AC2-141 E
Adder
3.96117647058823553.367
944602AF1-125 E
Adder
32.9423529411764728.001
3145506HICKORY
Adder
0.70117647058823530.596
934576AD1-082 E
Adder
1.53176470588235311.302
957871AF2-081 C
Adder
3.1905882352941182.712
943612AF1-032 E
Adder
0.30.255
3130536PAPERMILL
Adder
3.2082352941176472.727
939602AE1-190 E
Adder
0.64823529411764710.551
936591AD2-074 C
Adder
2.4564705882352942.088
958261AF2-120 C
Adder
2.73529411764705932.325
941591AE2-156 C
Adder
6.0388235294117655.133
925332AB2-190 E
50/50
4.9124.912
944591AF1-124 C
Adder
14.66705882352941312.467
944601AF1-125 C
Adder
14.39058823529411812.232
927226AC1-216 E
50/50
4.3534.353
3150601CHESTF5
50/50
79.76279.762
936666AD2-085 E
Adder
1.86823529411764721.588
962962AG1-145 E
Adder
0.65882352941176480.56
938771AE1-103 C
Adder
0.86470588235294120.735
964212AG1-282 E
Adder
0.59647058823529410.507
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.4860.486
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.7321.732
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.1910.191
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.8090.809
CBM South 2LTFEXP_CBM-S2->PJM
CBM
12.85612.856
CPLELTFEXP_CPLE->PJM
CLTF
1.71.7
LAGNLTFEXP_LAGN->PJM
CLTF
0.7290.729
TVALTFEXP_TVA->PJM
CLTF
0.5590.559
O66PJM->LTFIMP_O-066
CMTX_NF
3.6293.629
G-007PJM->LTFIMP_G-007
CMTX_NF
0.5680.568
SIGELTFEXP_SIGE->PJM
CLTF
0.010.01
NYPJM->LTFIMP_NY
CLTF
0.280.28
LGEELTFEXP_LGEE->PJM
CLTF
0.0310.031
WECLTFEXP_WEC->PJM
CLTF
0.0140.014

Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer
Contingency Name:
DVP_P1-2: LN 557_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:108.08 %
Rating:879.84 MVA
Rating Type:B
MVA to Mitigate:950.89
MW Contribution:6.79
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer
Contingency Name:
DVP_P1-2: LN 557_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:132.69 %
Rating:879.84 MVA
Rating Type:B
MVA to Mitigate:1167.49
MW Contribution:7.47
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
933292AC2-141 E
Adder
6.8564705882352955.828
946262AF1-291 E
Adder
1.04588235294117650.889
3150651CHESTF6
Adder
13.78941176470588211.721
944602AF1-125 E
Adder
54.7376470588235346.527
3145506HICKORY
Adder
1.16588235294117660.991
934576AD1-082 E
Adder
2.6682352941176472.268
957871AF2-081 C
Adder
5.3211764705882354.523
943612AF1-032 E
Adder
0.49647058823529410.422
942002AE2-212 E
Adder
0.98705882352941180.839
3150831SPRUNCA
Adder
6.84941176470588255.822
3150841SPRUNCB
Adder
6.84941176470588255.822
939412AE1-173 E
Adder
27.4976470588235323.373
941032AE2-094 E
Adder
7.0964705882352946.032
941031AE2-094 C
Adder
15.84470588235294213.468
944011AF1-069 C
Adder
4.7458823529411774.034
941591AE2-156 C
Adder
9.744705882352948.283
925332AB2-190 E
Adder
5.5094117647058834.683
944591AF1-124 C
Adder
24.37176470588235620.716
944601AF1-125 C
Adder
23.9117647058823520.325
927226AC1-216 E
Adder
5.1070588235294124.341
3150601CHESTF5
Adder
47.7840.613
936666AD2-085 E
Adder
3.18705882352941172.709
962962AG1-145 E
Adder
0.94000000000000010.799
938771AE1-103 C
Adder
1.5164705882352941.289
3145413WATKINS
Adder
0.348235294117647030.296
966881AG1-559 C
Adder
1.37764705882352941.171
960081AF2-299 C
Adder
0.84823529411764710.721
964212AG1-282 E
Adder
0.88117647058823530.749
926072AC1-086 E
Adder
4.36235294117647053.708
3150431FOUR RIVERA
50/50
2.7882.788
925865AC1-065 E
Adder
11.2529411764705879.565
939262AE1-157 E
Adder
3.56941176470588233.034
961951AG1-038 C
Adder
2.1047058823529411.789
961952AG1-038 E
Adder
2.9058823529411772.47
946282AF1-292 E
Adder
0.46823529411764710.398
936582AD2-073 E
Adder
0.67176470588235290.571
939411AE1-173 C
Adder
41.24705882352941435.06
940432AE2-027 E
Adder
6.1164705882352945.199
934012AD1-025 E
Adder
6.6117647058823535.62
938552AE1-074 E
Adder
0.81882352941176460.696
926755AC1-161 E
Adder
6.8564705882352955.828
933291AC2-141 C
Adder
16.0623529411764713.653
925522AC1-027 E
Adder
0.65764705882352950.559
944631AF1-128 C
Adder
29.89647058823529225.412
957872AF2-081 E
Adder
2.281.938
3145256KINGFORK
Adder
0.56470588235294120.48
3150921YORKTN3
Adder
72.7576470588235461.844
316160AE1-175 E
Adder
0.77529411764705890.659
316312AB1-027 C
50/50
0.4790.479
941102AE2-104 E
Adder
2.89058823529411772.457
315052AA1-145 CT2
50/50
4.444.44
936592AD2-074 E
Adder
5.9376470588235295.047
934782AD1-105 E
50/50
4.3454.345
3143316POE
Adder
0.84470588235294120.718
939191AE1-149 C
Adder
6.78235294117647055.765
901082W1-029 E
Adder
16.73529411764705814.225
934146AD1-041 E
Adder
2.38470588235294122.027
957601AF2-054 C
Adder
1.40235294117647061.192
958261AF2-120 C
Adder
4.07294117647058853.462
316233AE1-074 C
Adder
1.62470588235294121.381
935162AD1-151 E
Adder
7.235294117647066.15
3150691DARBY 3
50/50
2.2142.214
938532AE1-072 E
Adder
4.8694117647058834.139
3146326AYDLETT TAP
Adder
0.720.612
943461AF1-017 C
Adder
0.76588235294117660.651
316311AC2-079 C
Adder
3.2352941176470592.75
932596AC2-079 E
Adder
5.284.488
917122Z2-027 E
Adder
0.70705882352941170.601
957832AF2-077 E
Adder
0.90470588235294120.769
3150481FOUR RIVERF
50/50
3.3563.356
315051AA1-145 CT1
50/50
4.4424.442
927042AC1-191 E
50/50
4.814.81
940551AE2-041 C
Adder
4.8305882352941174.106
942001AE2-212 C
Adder
1.48117647058823531.259
939192AE1-149 E
Adder
4.5223529411764713.844
934065AD1-033 E
Adder
2.68823529411764732.285
939312AE1-162 E
Adder
0.84352941176470590.717
937226AE2-253 E
Adder
3.1152941176470592.648
3142296MT RD221
50/50
0.1260.126
316004AC1-112 C
50/50
0.2990.299
3150471FOUR RIVERE
50/50
2.7482.748
924517AB2-100 E2
Adder
1.3717647058823531.166
934501AD1-074 C
Adder
16.4776470588235314.006
943741AF1-042 C
Adder
1.90352941176470611.618
962861AG1-135 C
Adder
3.9564705882352943.363
3141813NORNECK
Adder
0.57411764705882350.488
3150501FOURRIVERG
50/50
4.254.25
316240AF1-291 C
Adder
1.56941176470588251.334
944641AF1-129 C
Adder
75.7352941176470664.375
924814AB2-134 E
Adder
8.3647058823529427.11
919152AA1-139 E1
Adder
2.1752941176470591.849
942342AE2-247 E
Adder
1.16941176470588240.994
920042AA2-088 E OP
Adder
5.164.386
934511AD1-075 C
Adder
4.1188235294117653.501
934521AD1-076 C
Adder
5.9847058823529415.087
3145723EMPORIA
Adder
0.195294117647058840.166
939246AE1-155 E
Adder
5.6705882352941184.82
923573AB1-173 E OP
Adder
1.4764705882352941.255
957972AF2-091 E
Adder
1.5517647058823531.319
944582AF1-123 E
Adder
55.6105882352941247.269
944592AF1-124 E
Adder
55.81176470588235447.44
935112AD1-144 E
Adder
0.52352941176470590.445
316349AD2-085 C
Adder
1.95294117647058821.66
930122AB1-027 E
50/50
1.2571.257
316169AC1-164 GEN
Adder
29.68117647058823425.229
923832AB2-022 E
Adder
0.65529411764705890.557
938772AE1-103 E
Adder
2.09411764705882361.78
916042Z1-036 E
Adder
14.65058823529411712.453
966882AG1-559 E
Adder
0.69411764705882350.59
939261AE1-157 C
Adder
6.5811764705882365.594
946281AF1-292 C
Adder
0.70235294117647060.597
960082AF2-299 E
Adder
0.56588235294117650.481
926071AC1-086 C
Adder
9.5835294117647068.146
957971AF2-091 C
Adder
1.12352941176470590.955
926662AC1-147 E
Adder
0.72117647058823530.613
916192Z1-068 E
Adder
1.0152941176470590.863
316076AC2-137 E
Adder
1.04588235294117650.889
957492AF2-043 E
Adder
0.76352941176470590.649
923852AB2-025 E
Adder
0.58235294117647060.495
966872AG1-558 E
50/50
1.2121.212
966871AG1-558 C
50/50
2.4052.405
923842AB2-024 E
Adder
1.2282352941176471.044
316157AD2-030 E
Adder
0.78705882352941180.669
964211AG1-282 C
Adder
1.32117647058823541.123
961941AG1-037 C
Adder
0.238823529411764740.203
961942AG1-037 E
Adder
0.158823529411764720.135
920692AA2-178 E
Adder
2.05294117647058851.745
966622AG1-532 E
Adder
0.424705882352941160.361
3142366NRTHEST
50/50
0.1640.164
961611AG1-000B C
Adder
10.0094117647058818.508
3138116ELKO L286
Adder
1.09058823529411760.927
940541AE2-040 C
Adder
1.44117647058823551.225
940482AE2-033 E
Adder
5.4364705882352954.621
940481AE2-033 C
Adder
8.0647058823529436.855
927041AC1-191 C
50/50
9.6569.656
963611AG1-210 C
Adder
0.431764705882352940.367
923263AB1-132 E OP
Adder
2.78941176470588252.371
940641AE2-051 C
Adder
7.4376470588235296.322
316084AB2-161 E
Adder
3.34823529411764742.846
926785AC1-164_E
Adder
13.3352941176470611.335
943471AF1-018 C
Adder
4.8305882352941174.106
3145946PLYMOUTH TP
Adder
0.158823529411764720.135
933982AD1-022 E
Adder
2.3152941176470591.968
926472AC1-118 E
Adder
0.64470588235294120.548
3150731STONECA
Adder
4.9341176470588244.194
932046AC2-012 E
Adder
7.1352941176470596.065
935161AD1-151 C
Adder
10.8541176470588259.226
3150701DARBY 4
50/50
2.2172.217
938531AE1-072 C
Adder
9.3411764705882367.94
958161AF2-110 C
Adder
0.74235294117647070.631
3145393UNCAMP
Adder
3.11647058823529432.649
933981AD1-022 C
Adder
4.2529411764705883.615
900672V4-068 E
Adder
0.170588235294117650.145
940642AE2-051 E
Adder
4.9588235294117654.215
3150681DARBY 2
50/50
2.2072.207
919153AA1-139 E2
Adder
2.1752941176470591.849
943462AF1-017 E
Adder
1.24941176470588241.062
942341AE2-247 C
Adder
0.84705882352941180.72
926412AC1-112 E
50/50
1.0221.022
958162AF2-110 E
Adder
1.181.003
924516AB2-100 E1
Adder
1.3717647058823531.166
934512AD1-075 E
Adder
2.09647058823529431.782
934502AD1-074 E
Adder
8.3882352941176477.13
966621AG1-532 C
Adder
0.63647058823529420.541
918512AA1-065 E OP
Adder
2.62941176470588232.235
963612AG1-210 E
Adder
0.64705882352941180.55
934781AD1-105 C
50/50
1.0481.048
940431AE2-027 C
Adder
9.175294117647067.799
944581AF1-123 C
Adder
24.2847058823529420.642
941101AE2-104 C
Adder
1.81764705882352941.545
3150461FOUR RIVERD
50/50
2.7482.748
934392AD1-063 E
Adder
0.72470588235294120.616
943742AF1-042 E
Adder
3.10705882352941172.641
962862AG1-135 E
Adder
2.63764705882352952.242
966662AG1-536 E
Adder
4.7070588235294134.001
316088AB2-174 E
Adder
2.94235294117647062.501
316141AB2-099 E
Adder
0.118823529411764720.101
923994AB2-040_E
Adder
2.76941176470588252.354
944492AF1-114 E
Adder
4.5635294117647063.879
3150441FOUR RIVERB
50/50
2.7882.788
3130536PAPERMILL
Adder
4.5270588235294123.848
939602AE1-190 E
Adder
0.95411764705882360.811
940492AE2-034 E
Adder
1.53882352941176471.308
934522AD1-076 E
Adder
3.0505882352941182.593
936591AD2-074 C
Adder
3.63882352941176463.093
943172AE2-346 E
Adder
0.28588235294117650.243
918492AA1-063AE OP
Adder
1.88000000000000011.598
3150671DARBY 1
50/50
2.2042.204
913392Y1-086 E
Adder
1.160.986
3150451FOUR RIVERC
50/50
3.4073.407
939612AE1-191 E
Adder
3.8152941176470593.243
957602AF2-054 E
Adder
0.93529411764705890.795
966661AG1-536 C
Adder
3.50352941176470622.978
958262AF2-120 E
Adder
2.7152941176470592.308
316078AC2-138 E
Adder
0.60352941176470590.513
944491AF1-114 C
Adder
3.30470588235294162.809
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.9732.973
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0350.035
MECLTFEXP_MEC->PJM
CLTF
0.2010.201
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.7881.788
CBM South 2LTFEXP_CBM-S2->PJM
CBM
28.04428.044
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0870.087
LAGNLTFEXP_LAGN->PJM
CLTF
1.4041.404
CPLELTFEXP_CPLE->PJM
CLTF
3.7593.759
TVALTFEXP_TVA->PJM
CLTF
1.0611.061
O66PJM->LTFIMP_O-066
CMTX_NF
6.8436.843
G-007PJM->LTFIMP_G-007
CMTX_NF
1.0691.069
SIGELTFEXP_SIGE->PJM
CLTF
0.0060.006
NYPJM->LTFIMP_NY
CLTF
0.5450.545

Details for 6FINES-6FREDBRG 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2090_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FINES-6FREDBRG 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 2090_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:111.92 %
Rating:548.02 MVA
Rating Type:B
MVA to Mitigate:613.36
MW Contribution:12.66
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FINES-6FREDBRG 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 2090_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:120.42 %
Rating:548.02 MVA
Rating Type:B
MVA to Mitigate:659.91
MW Contribution:12.01
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
925865AC1-065 E
50/50
9.9089.908
939601AE1-190 C
50/50
0.210.21
961951AG1-038 C
50/50
3.4653.465
961952AG1-038 E
50/50
4.7854.785
316077AC2-138 C
50/50
0.3060.306
936582AD2-073 E
50/50
1.8441.844
316223AC1-118 C
50/50
0.7290.729
936592AD2-074 E
50/50
9.7769.776
316201AC1-065 C
50/50
0.9690.969
934146AD1-041 E
50/50
2.2042.204
957601AF2-054 C
50/50
1.3771.377
316404AE1-155 C
50/50
2.5772.577
958261AF2-120 C
50/50
7.5977.597
3150341NORNECKC1
50/50
0.9060.906
316280AD1-041 C
50/50
0.5380.538
939246AE1-155 E
50/50
10.57910.579
957972AF2-091 E
50/50
9.3619.361
943741AF1-042 C
50/50
3.1353.135
962861AG1-135 C
50/50
7.1767.176
3141813NORNECK
50/50
1.1861.186
316337AD2-073 C
50/50
0.6080.608
3150351NORNECKC2
50/50
0.8730.873
957971AF2-091 C
50/50
6.7796.779
923842AB2-024 E
Adder
1.00941176470588250.858
316157AD2-030 E
50/50
0.7730.773
964211AG1-282 C
50/50
2.5072.507
957191AF2-013 C
50/50
62.06862.068
3141316ARNOLDS
50/50
0.9590.959
957832AF2-077 E
Adder
0.65764705882352950.559
940551AE2-041 C
50/50
4.2554.255
963611AG1-210 C
50/50
0.8910.891
943471AF1-018 C
50/50
4.2554.255
926472AC1-118 E
50/50
2.32.3
316059AD1-063 C
50/50
0.1560.156
963612AG1-210 E
50/50
1.3361.336
934392AD1-063 E
50/50
0.6380.638
943742AF1-042 E
50/50
5.1155.115
962862AG1-135 E
50/50
4.7844.784
966662AG1-536 E
50/50
8.7828.782
944492AF1-114 E
50/50
27.53327.533
939612AE1-191 E
50/50
3.5263.526
957602AF2-054 E
50/50
0.9180.918
966661AG1-536 C
50/50
6.5356.535
958262AF2-120 E
50/50
5.0655.065
316078AC2-138 E
50/50
1.2471.247
944491AF1-114 C
50/50
19.93819.938
3150331BIRCHWDA
50/50
150.208150.208
3130536PAPERMILL
Adder
3.7752941176470593.209
939602AE1-190 E
50/50
0.8810.881
939611AE1-191 C
50/50
0.8490.849
936591AD2-074 C
50/50
5.9925.992
316156AD2-030 C
50/50
0.2470.247
964212AG1-282 E
50/50
1.6711.671
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.7873.787
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.7822.782
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.7010.701
CBM South 2LTFEXP_CBM-S2->PJM
CBM
12.08512.085
CPLELTFEXP_CPLE->PJM
CLTF
1.471.47
MECLTFEXP_MEC->PJM
CLTF
0.4850.485
LAGNLTFEXP_LAGN->PJM
CLTF
0.9590.959
TVALTFEXP_TVA->PJM
CLTF
0.7570.757
O66PJM->LTFIMP_O-066
CMTX_NF
4.8694.869
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7660.766
SIGELTFEXP_SIGE->PJM
CLTF
0.030.03
NYPJM->LTFIMP_NY
CLTF
0.3510.351
LGEELTFEXP_LGEE->PJM
CLTF
0.1550.155
WECLTFEXP_WEC->PJM
CLTF
0.0790.079

Details for 6FREDBRG-6CRANES 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 9296_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6FREDBRG-6CRANES 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 9296_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:103.41 %
Rating:984.18 MVA
Rating Type:B
MVA to Mitigate:1017.75
MW Contribution:8.21
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
6FREDBRG-6CRANES 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 9296_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:106.95 %
Rating:984.18 MVA
Rating Type:B
MVA to Mitigate:1052.62
MW Contribution:7.92
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
943741AF1-042 C
Adder
2.1047058823529411.789
962861AG1-135 C
Adder
4.6870588235294123.984
3141813NORNECK
Adder
0.74941176470588230.637
3150501FOURRIVERG
50/50
4.2364.236
316337AD2-073 C
50/50
0.360.36
944631AF1-128 C
Adder
14.20352941176470712.073
3150921YORKTN3
Adder
40.83647058823529434.711
316160AE1-175 E
Adder
0.42352941176470590.36
936592AD2-074 E
Adder
6.5623529411764715.578
3150411LDYSMT5
50/50
4.1824.182
934782AD1-105 E
50/50
4.9274.927
3150831SPRUNCA
Adder
2.9682352941176472.523
3150841SPRUNCB
Adder
2.9682352941176472.523
316076AC2-137 E
Adder
0.50117647058823530.426
966872AG1-558 E
Adder
0.60235294117647060.512
966871AG1-558 C
Adder
1.19529411764705881.016
923842AB2-024 E
Adder
0.87294117647058820.742
316157AD2-030 E
Adder
0.62235294117647070.529
964211AG1-282 C
Adder
1.61647058823529431.374
957191AF2-013 C
50/50
31.53231.532
3141316ARNOLDS
50/50
0.4820.482
925865AC1-065 E
Adder
8.3388235294117667.088
939262AE1-157 E
Adder
5.8988235294117655.014
961951AG1-038 C
Adder
2.32588235294117671.977
961952AG1-038 E
Adder
3.2117647058823532.73
3138116ELKO L286
Adder
0.52235294117647060.444
927041AC1-191 C
Adder
4.797647058823534.078
3150371LDYSMT1
50/50
4.0024.002
963611AG1-210 C
Adder
0.56235294117647060.478
926785AC1-164_E
Adder
6.9235294117647065.885
943471AF1-018 C
Adder
3.5752941176470593.039
926472AC1-118 E
50/50
1.3011.301
940431AE2-027 C
Adder
4.2764705882352943.635
934392AD1-063 E
Adder
0.53647058823529410.456
943742AF1-042 E
Adder
3.43411764705882352.919
962862AG1-135 E
Adder
3.12470588235294142.656
966662AG1-536 E
Adder
5.69176470588235354.838
944492AF1-114 E
50/50
14.57414.574
940432AE2-027 E
Adder
2.85176470588235282.424
934012AD1-025 E
Adder
3.2352941176470592.75
939612AE1-191 E
Adder
2.9082352941176472.472
957602AF2-054 E
Adder
0.73882352941176480.628
966661AG1-536 C
Adder
4.2352941176470593.6
958262AF2-120 E
Adder
3.2823529411764712.79
316078AC2-138 E
Adder
0.78705882352941180.669
944491AF1-114 C
50/50
10.55310.553
3150331BIRCHWDA
50/50
74.60374.603
316240AF1-291 C
Adder
0.70.595
944641AF1-129 C
Adder
33.5564705882352928.523
924814AB2-134 E
Adder
4.0941176470588233.48
939246AE1-155 E
Adder
6.8564705882352955.828
957972AF2-091 E
50/50
4.9554.955
946262AF1-291 E
Adder
0.46705882352941180.397
3150651CHESTF6
Adder
6.1094117647058825.193
3130536PAPERMILL
Adder
3.2447058823529412.758
939602AE1-190 E
Adder
0.72705882352941180.618
936591AD2-074 C
Adder
4.0223529411764713.419
926412AC1-112 E
Adder
0.42588235294117650.362
963612AG1-210 E
Adder
0.84352941176470590.717
934781AD1-105 C
50/50
1.1881.188
3150731STONECA
Adder
2.3152941176470591.968
935161AD1-151 C
Adder
5.2623529411764714.473
935162AD1-151 E
Adder
3.50823529411764762.982
957832AF2-077 E
Adder
0.61058823529411770.519
927042AC1-191 E
Adder
2.38941176470588262.031
940551AE2-041 C
Adder
3.5752941176470593.039
3150381LDYSMT2
50/50
4.0544.054
934146AD1-041 E
Adder
1.81764705882352941.545
957601AF2-054 C
Adder
1.1082352941176470.942
3150401LDYSMT4
50/50
4.1694.169
958261AF2-120 C
Adder
4.9235294117647054.185
936582AD2-073 E
50/50
1.0931.093
316223AC1-118 C
50/50
0.4130.413
930122AB1-027 E
Adder
0.52352941176470590.445
316169AC1-164 GEN
Adder
15.41058823529411913.099
966882AG1-559 E
Adder
0.860.731
939261AE1-157 C
Adder
10.8741176470588249.243
3150391LDYSMT3
50/50
4.1614.161
957971AF2-091 C
50/50
3.5883.588
925332AB2-190 E
Adder
2.64941176470588242.252
927226AC1-216 E
Adder
2.4988235294117652.124
3150601CHESTF5
Adder
22.70000000000000319.295
962962AG1-145 E
Adder
0.51294117647058820.436
966881AG1-559 C
Adder
1.7082352941176471.452
964212AG1-282 E
Adder
1.07764705882352940.916
CBM West 1LTFEXP_CBM-W1->PJM
CBM
7.527.52
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.1185.118
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.1581.158
CBM South 2LTFEXP_CBM-S2->PJM
CBM
20.40420.404
CPLELTFEXP_CPLE->PJM
CLTF
2.432.43
MECLTFEXP_MEC->PJM
CLTF
0.9270.927
LAGNLTFEXP_LAGN->PJM
CLTF
1.7211.721
TVALTFEXP_TVA->PJM
CLTF
1.3651.365
O66PJM->LTFIMP_O-066
CMTX_NF
9.8729.872
G-007PJM->LTFIMP_G-007
CMTX_NF
1.5531.553
SIGELTFEXP_SIGE->PJM
CLTF
0.0590.059
NYPJM->LTFIMP_NY
CLTF
0.7040.704
LGEELTFEXP_LGEE->PJM
CLTF
0.3060.306
WECLTFEXP_WEC->PJM
CLTF
0.1570.157

Details for 6IRON208-6SOUWEST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6IRON208-6SOUWEST 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 557_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:110.61 %
Rating:663.64 MVA
Rating Type:B
MVA to Mitigate:734.04
MW Contribution:4.55
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:DVP
Facility Description:
6IRON208-6SOUWEST 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 557_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:110.43 %
Rating:663.64 MVA
Rating Type:B
MVA to Mitigate:732.86
MW Contribution:4.5
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
3150621CHESTS7
50/50
2.2332.233
3150611CHESTG7
50/50
4.8654.865
925865AC1-065 E
Adder
7.5847058823529416.447
961951AG1-038 C
Adder
1.41882352941176461.206
961952AG1-038 E
Adder
1.961.666
936582AD2-073 E
Adder
0.43647058823529410.371
924814AB2-134 E
Adder
7.1247058823529416.056
3150641CHESTS8
50/50
2.4642.464
919152AA1-139 E1
Adder
1.30235294117647071.107
942342AE2-247 E
Adder
0.68470588235294120.582
939246AE1-155 E
Adder
3.8047058823529413.234
939192AE1-149 E
Adder
2.55882352941176452.175
3150781HOPHCF2
50/50
1.651.65
934065AD1-033 E
Adder
1.61882352941176461.376
939312AE1-162 E
Adder
0.60.51
937226AE2-253 E
Adder
1.86705882352941191.587
943741AF1-042 C
Adder
1.28352941176470581.091
962861AG1-135 C
Adder
2.65764705882352952.259
3141813NORNECK
Adder
0.38352941176470590.326
926755AC1-161 E
Adder
3.9564705882352943.363
933291AC2-141 C
Adder
9.2670588235294127.877
925522AC1-027 E
Adder
0.401176470588235360.341
944631AF1-128 C
50/50
49.89149.891
957872AF2-081 E
Adder
1.36588235294117651.161
3145256KINGFORK
Adder
0.35882352941176470.305
3150921YORKTN3
Adder
49.06352941176470541.704
316160AE1-175 E
Adder
0.54235294117647060.461
941102AE2-104 E
Adder
1.71882352941176491.461
936592AD2-074 E
Adder
4.0035294117647063.403
3150801HOPHCF4
50/50
2.5042.504
3150791HOPHCF3
50/50
1.651.65
926662AC1-147 E
Adder
0.44705882352941180.38
916192Z1-068 E
Adder
0.61882352941176480.526
316076AC2-137 E
Adder
0.52823529411764710.449
957492AF2-043 E
Adder
0.46117647058823530.392
923842AB2-024 E
Adder
0.8717647058823530.741
316157AD2-030 E
Adder
0.53882352941176470.458
964211AG1-282 C
Adder
0.89411764705882360.76
961611AG1-000B C
Adder
7.8705882352941186.69
3138116ELKO L286
Adder
0.55058823529411770.468
963611AG1-210 C
Adder
0.288235294117647030.245
316084AB2-161 E
Adder
1.921.632
926785AC1-164_E
Adder
10.0635294117647078.554
943471AF1-018 C
Adder
3.3847058823529412.877
926472AC1-118 E
Adder
0.402352941176470640.342
3150731STONECA
Adder
4.6705882352941183.97
919153AA1-139 E2
Adder
1.30235294117647071.107
943462AF1-017 E
Adder
0.7317647058823530.622
940431AE2-027 C
Adder
3.9788235294117653.382
3150771HOPHCF1
50/50
1.651.65
944581AF1-123 C
Adder
14.5952941176470612.406
941101AE2-104 C
Adder
1.08117647058823540.919
934392AD1-063 E
Adder
0.50823529411764710.432
943742AF1-042 E
Adder
2.09529411764705881.781
962862AG1-135 E
Adder
1.7717647058823531.506
966662AG1-536 E
Adder
3.1588235294117652.685
940432AE2-027 E
Adder
2.6529411764705882.255
934012AD1-025 E
Adder
5.6305882352941174.786
913392Y1-086 E
Adder
0.69058823529411760.587
939612AE1-191 E
Adder
2.58941176470588232.201
957602AF2-054 E
Adder
0.640.544
966661AG1-536 C
Adder
2.35058823529411761.998
958262AF2-120 E
Adder
1.82117647058823541.548
316078AC2-138 E
Adder
0.40352941176470590.343
933292AC2-141 E
Adder
3.9564705882352943.363
944602AF1-125 E
Adder
32.8976470588235327.963
3145506HICKORY
Adder
0.70.595
934576AD1-082 E
Adder
1.52941176470588251.3
957871AF2-081 C
Adder
3.18588235294117662.708
943612AF1-032 E
Adder
0.30.255
3130536PAPERMILL
Adder
3.20588235294117662.725
939602AE1-190 E
Adder
0.64705882352941180.55
936591AD2-074 C
Adder
2.45411764705882352.086
942341AE2-247 C
Adder
0.495294117647058830.421
958162AF2-110 E
Adder
0.70117647058823530.596
963612AG1-210 E
Adder
0.431764705882352940.367
3143096IRON208
50/50
1.1521.152
939191AE1-149 C
Adder
3.83764705882352963.262
901082W1-029 E
Adder
9.9105882352941178.424
934146AD1-041 E
Adder
1.61882352941176461.376
957601AF2-054 C
Adder
0.960.816
958261AF2-120 C
Adder
2.7317647058823532.322
932046AC2-012 E
Adder
4.4211764705882353.758
935161AD1-151 C
Adder
9.475294117647068.054
938531AE1-072 C
Adder
5.58588235294117654.748
958161AF2-110 C
Adder
0.44117647058823530.375
3145393UNCAMP
Adder
1.75764705882352961.494
935162AD1-151 E
Adder
6.3164705882352945.369
938532AE1-072 E
Adder
2.91176470588235332.475
3146326AYDLETT TAP
Adder
0.430588235294117660.366
943461AF1-017 C
Adder
0.448235294117647070.381
316311AC2-079 C
Adder
1.89882352941176481.614
932596AC2-079 E
Adder
3.09764705882352942.633
917122Z2-027 E
Adder
0.420.357
957832AF2-077 E
Adder
0.61529411764705890.523
940551AE2-041 C
Adder
3.3847058823529412.877
944582AF1-123 E
Adder
33.4223529411764728.409
944592AF1-124 E
Adder
33.5435294117647128.512
3150631CHESTG8
50/50
4.7884.788
935112AD1-144 E
Adder
0.332941176470588240.283
316349AD2-085 C
Adder
1.1435294117647060.972
316169AC1-164 GEN
Adder
22.40117647058823619.041
923832AB2-022 E
Adder
0.38941176470588240.331
938772AE1-103 E
Adder
1.19294117647058821.014
916042Z1-036 E
Adder
8.5047058823529427.229
941591AE2-156 C
Adder
6.0305882352941185.126
925332AB2-190 E
Adder
4.9082352941176474.172
944591AF1-124 C
Adder
14.64823529411764712.451
944601AF1-125 C
Adder
14.37058823529411812.215
927226AC1-216 E
Adder
4.34941176470588253.697
3150601CHESTF5
50/50
79.73479.734
936666AD2-085 E
Adder
1.86588235294117651.586
962962AG1-145 E
Adder
0.65764705882352950.559
938771AE1-103 C
Adder
0.86352941176470590.734
964212AG1-282 E
Adder
0.59647058823529410.507
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.3540.354
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.6811.681
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.1790.179
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.8060.806
CBM South 2LTFEXP_CBM-S2->PJM
CBM
12.77712.777
CPLELTFEXP_CPLE->PJM
CLTF
1.6931.693
LAGNLTFEXP_LAGN->PJM
CLTF
0.7160.716
TVALTFEXP_TVA->PJM
CLTF
0.5480.548
O66PJM->LTFIMP_O-066
CMTX_NF
3.6813.681
G-007PJM->LTFIMP_G-007
CMTX_NF
0.5760.576
SIGELTFEXP_SIGE->PJM
CLTF
0.0090.009
NYPJM->LTFIMP_NY
CLTF
0.2840.284
LGEELTFEXP_LGEE->PJM
CLTF
0.0270.027
WECLTFEXP_WEC->PJM
CLTF
0.0120.012

Details for 6LADYSMITH-8LADYSMITH 230.0/500.0 kV Ckt 2 transformer l/o DVP_P1-2: LN 574_SRT-S_SENS


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6LADYSMITH-8LADYSMITH 230.0/500.0 kV Ckt 2 transformer
Contingency Name:
DVP_P1-2: LN 574_SRT-S_SENS
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:103.88 %
Rating:889.43 MVA
Rating Type:B
MVA to Mitigate:923.97
MW Contribution:5.24
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
942001AE2-212 C
Adder
0.83647058823529410.711
939192AE1-149 E
Adder
2.57647058823529432.19
934065AD1-033 E
Adder
1.56941176470588251.334
939312AE1-162 E
Adder
0.494117647058823550.42
937226AE2-253 E
Adder
1.81764705882352941.545
3142296MT RD221
50/50
0.0710.071
3150471FOUR RIVERE
50/50
2.4972.497
943741AF1-042 C
Adder
1.42235294117647081.209
962861AG1-135 C
Adder
3.02941176470588272.575
3141813NORNECK
Adder
0.456470588235294130.388
3150501FOURRIVERG
50/50
3.0343.034
938552AE1-074 E
Adder
0.44235294117647060.376
926755AC1-161 E
Adder
4.0258823529411773.422
933291AC2-141 C
Adder
9.4305882352941198.016
925522AC1-027 E
Adder
0.38352941176470590.326
944631AF1-128 C
Adder
17.6505882352941215.003
957872AF2-081 E
Adder
1.33058823529411761.131
3145256KINGFORK
Adder
0.33176470588235290.282
3150921YORKTN3
Adder
44.5435294117647137.862
316160AE1-175 E
Adder
0.476470588235294150.405
941102AE2-104 E
Adder
1.68117647058823551.429
315052AA1-145 CT2
50/50
4.0344.034
3150831SPRUNCA
Adder
3.83529411764705853.26
3150841SPRUNCB
Adder
3.83529411764705853.26
926662AC1-147 E
Adder
0.421176470588235260.358
916192Z1-068 E
Adder
0.59294117647058830.504
316076AC2-137 E
Adder
0.62823529411764710.534
957492AF2-043 E
Adder
0.44588235294117650.379
966872AG1-558 E
50/50
0.7240.724
966871AG1-558 C
50/50
1.4381.438
923842AB2-024 E
Adder
0.80588235294117660.685
316157AD2-030 E
Adder
0.52941176470588240.45
964211AG1-282 C
Adder
1.02470588235294110.871
957191AF2-013 C
Adder
10.3282352941176478.779
3141316ARNOLDS
50/50
0.150.15
961611AG1-000B C
Adder
5.8729411764705884.992
3138116ELKO L286
Adder
0.65411764705882360.556
927041AC1-191 C
50/50
5.7735.773
3150371LDYSMT1
50/50
6.5036.503
963611AG1-210 C
Adder
0.34235294117647060.291
316084AB2-161 E
Adder
1.91764705882352931.63
926785AC1-164_E
Adder
8.2141176470588246.982
943471AF1-018 C
Adder
3.20117647058823532.721
926472AC1-118 E
Adder
0.61882352941176480.526
942002AE2-212 E
Adder
0.55764705882352940.474
940431AE2-027 C
Adder
5.2517647058823544.464
944581AF1-123 C
Adder
14.17176470588235312.046
941101AE2-104 C
Adder
1.05764705882352940.899
3150461FOUR RIVERD
50/50
2.4972.497
934392AD1-063 E
Adder
0.480.408
943742AF1-042 E
Adder
2.321.972
962862AG1-135 E
Adder
2.021.717
966662AG1-536 E
Adder
3.63176470588235353.087
944492AF1-114 E
Adder
5.6211764705882354.778
936592AD2-074 E
Adder
4.4352941176470593.77
3150411LDYSMT5
50/50
6.7946.794
934782AD1-105 E
50/50
3.2413.241
940432AE2-027 E
Adder
3.50117647058823562.976
934012AD1-025 E
Adder
3.86235294117647053.283
913392Y1-086 E
Adder
0.6764705882352940.575
3150451FOUR RIVERC
50/50
3.0963.096
939612AE1-191 E
Adder
2.54117647058823562.16
957602AF2-054 E
Adder
0.62941176470588240.535
966661AG1-536 C
Adder
2.7023529411764712.297
958262AF2-120 E
Adder
2.09411764705882361.78
316078AC2-138 E
Adder
0.47882352941176470.407
944491AF1-114 C
Adder
4.0705882352941173.46
3150331BIRCHWDA
50/50
21.96921.969
933292AC2-141 E
Adder
4.0258823529411773.422
946262AF1-291 E
Adder
0.59411764705882350.505
3150651CHESTF6
Adder
7.8352941176470596.66
944602AF1-125 E
Adder
31.9423529411764727.151
3145506HICKORY
Adder
0.67999999999999990.578
934576AD1-082 E
Adder
1.5282352941176471.299
957871AF2-081 C
Adder
3.1047058823529412.639
943612AF1-032 E
Adder
0.289411764705882370.246
3150441FOUR RIVERB
50/50
2.5342.534
3130536PAPERMILL
Adder
2.9788235294117652.532
939602AE1-190 E
Adder
0.63529411764705890.54
936591AD2-074 C
Adder
2.71764705882352952.31
919153AA1-139 E2
Adder
1.26941176470588221.079
943462AF1-017 E
Adder
0.72235294117647060.614
942341AE2-247 C
Adder
0.48941176470588230.416
926412AC1-112 E
Adder
0.59882352941176480.509
958162AF2-110 E
Adder
0.68588235294117650.583
963612AG1-210 E
Adder
0.51294117647058820.436
934781AD1-105 C
50/50
0.7810.781
3150731STONECA
Adder
2.8635294117647062.434
932046AC2-012 E
Adder
4.1682352941176483.543
935161AD1-151 C
Adder
6.3305882352941185.381
938531AE1-072 C
Adder
5.4494117647058824.632
958161AF2-110 C
Adder
0.431764705882352940.367
316233AE1-074 C
Adder
0.87882352941176480.747
935162AD1-151 E
Adder
4.2200000000000013.587
938532AE1-072 E
Adder
2.84117647058823542.415
3146326AYDLETT TAP
Adder
0.420.357
943461AF1-017 C
Adder
0.44235294117647060.376
316311AC2-079 C
Adder
1.8717647058823531.591
932596AC2-079 E
Adder
3.05411764705882362.596
917122Z2-027 E
Adder
0.41176470588235290.35
957832AF2-077 E
Adder
0.58117647058823530.494
3150481FOUR RIVERF
50/50
3.0493.049
315051AA1-145 CT1
50/50
4.0364.036
927042AC1-191 E
50/50
2.8762.876
940551AE2-041 C
Adder
3.20117647058823532.721
3150381LDYSMT2
50/50
6.5876.587
316240AF1-291 C
Adder
0.89058823529411770.757
944641AF1-129 C
Adder
43.036470588235336.581
924814AB2-134 E
Adder
4.88705882352941154.154
919152AA1-139 E1
Adder
1.26941176470588221.079
942342AE2-247 E
Adder
0.67529411764705880.574
939246AE1-155 E
Adder
4.3741176470588233.718
957972AF2-091 E
Adder
1.9117647058823531.625
3143316POE
Adder
0.47411764705882360.403
939191AE1-149 C
Adder
3.86470588235294173.285
934146AD1-041 E
Adder
1.58823529411764721.35
957601AF2-054 C
Adder
0.9435294117647060.802
3150401LDYSMT4
50/50
6.7736.773
958261AF2-120 C
Adder
3.14117647058823522.67
3150431FOUR RIVERA
50/50
2.5342.534
925865AC1-065 E
Adder
7.446.324
939262AE1-157 E
50/50
9.5879.587
961951AG1-038 C
Adder
1.57176470588235321.336
961952AG1-038 E
Adder
2.17058823529411751.845
936582AD2-073 E
Adder
0.58352941176470590.496
944582AF1-123 E
Adder
32.4505882352941227.583
944592AF1-124 E
Adder
32.5682352941176527.683
935112AD1-144 E
Adder
0.30705882352941180.261
316349AD2-085 C
Adder
1.1282352941176470.959
930122AB1-027 E
Adder
0.73529411764705890.625
316169AC1-164 GEN
Adder
18.2823529411764715.54
923832AB2-022 E
Adder
0.38235294117647060.325
966882AG1-559 E
50/50
1.3991.399
939261AE1-157 C
50/50
17.67517.675
3150391LDYSMT3
50/50
6.7616.761
957971AF2-091 C
Adder
1.3835294117647061.176
941591AE2-156 C
Adder
5.69058823529411754.837
925332AB2-190 E
Adder
3.2094117647058832.728
944591AF1-124 C
Adder
14.2223529411764712.089
944601AF1-125 C
Adder
13.95294117647058811.86
927226AC1-216 E
Adder
2.9835294117647062.536
3150601CHESTF5
Adder
28.20941176470588423.978
936666AD2-085 E
Adder
1.84117647058823521.565
962962AG1-145 E
Adder
0.57764705882352940.491
966881AG1-559 C
50/50
2.7772.777
964212AG1-282 E
Adder
0.68352941176470580.581
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.5122.512
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.1823.182
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.4520.452
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.081.08
CBM South 2LTFEXP_CBM-S2->PJM
CBM
18.02918.029
LAGNLTFEXP_LAGN->PJM
CLTF
1.2121.212
CPLELTFEXP_CPLE->PJM
CLTF
2.2672.267
TVALTFEXP_TVA->PJM
CLTF
0.9510.951
O66PJM->LTFIMP_O-066
CMTX_NF
8.1888.188
G-007PJM->LTFIMP_G-007
CMTX_NF
1.2851.285
SIGELTFEXP_SIGE->PJM
CLTF
0.0270.027
NYPJM->LTFIMP_NY
CLTF
0.610.61
LGEELTFEXP_LGEE->PJM
CLTF
0.1240.124
WECLTFEXP_WEC->PJM
CLTF
0.0580.058

Details for 6NRTHEST-6ELMONT 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
6NRTHEST-6ELMONT 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 557_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:117.46 %
Rating:678.68 MVA
Rating Type:B
MVA to Mitigate:797.16
MW Contribution:5.29
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:DVP
Facility Description:
6NRTHEST-6ELMONT 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 557_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:112.99 %
Rating:678.68 MVA
Rating Type:B
MVA to Mitigate:766.86
MW Contribution:5.06
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
316075AC2-137 C
50/50
0.4380.438
925865AC1-065 E
Adder
9.377647058823537.971
961951AG1-038 C
Adder
1.66235294117647061.413
961952AG1-038 E
Adder
2.2952941176470591.951
946282AF1-292 E
Adder
0.380.323
936582AD2-073 E
Adder
0.494117647058823550.42
926755AC1-161 E
Adder
5.5482352941176484.716
316240AF1-291 C
Adder
1.30470588235294121.109
944641AF1-129 C
Adder
63.01529411764706653.563
924814AB2-134 E
Adder
6.5788235294117645.592
919152AA1-139 E1
Adder
1.75411764705882381.491
942342AE2-247 E
Adder
0.94705882352941180.805
920042AA2-088 E OP
Adder
4.1788235294117653.552
934511AD1-075 C
Adder
3.3364705882352942.836
934521AD1-076 C
Adder
4.8470588235294124.12
939246AE1-155 E
Adder
4.423.757
942001AE2-212 C
Adder
1.23176470588235291.047
939192AE1-149 E
Adder
3.68588235294117663.133
934065AD1-033 E
Adder
2.16705882352941171.842
939312AE1-162 E
Adder
0.67411764705882350.573
937226AE2-253 E
Adder
2.5117647058823532.135
924517AB2-100 E2
Adder
1.11411764705882340.947
934501AD1-074 C
Adder
13.34588235294117611.344
943741AF1-042 C
Adder
1.5035294117647061.278
962861AG1-135 C
Adder
3.09411764705882362.63
3141813NORNECK
Adder
0.44235294117647060.376
933291AC2-141 C
Adder
12.9976470588235311.048
925522AC1-027 E
Adder
0.52941176470588240.45
944631AF1-128 C
Adder
21.0152941176470617.863
957872AF2-081 E
Adder
1.83882352941176471.563
3145256KINGFORK
Adder
0.455294117647058850.387
3150921YORKTN3
Adder
59.65411764705882550.706
316160AE1-175 E
Adder
0.64705882352941180.55
941102AE2-104 E
Adder
2.33411764705882341.984
936592AD2-074 E
Adder
4.6894117647058823.986
944582AF1-123 E
Adder
44.8238.097
944592AF1-124 E
Adder
44.9823529411764738.235
935112AD1-144 E
Adder
0.42235294117647060.359
316349AD2-085 C
Adder
1.58235294117647051.345
316169AC1-164 GEN
50/50
25.43925.439
923832AB2-022 E
Adder
0.52823529411764710.449
938772AE1-103 E
Adder
1.69294117647058841.439
916042Z1-036 E
Adder
11.8376470588235310.062
946281AF1-292 C
Adder
0.56941176470588240.484
960082AF2-299 E
Adder
0.458823529411764740.39
3150831SPRUNCA
50/50
10.71910.719
3150841SPRUNCB
50/50
10.71910.719
939412AE1-173 E
Adder
21.918.615
926662AC1-147 E
Adder
0.580.493
916192Z1-068 E
Adder
0.81764705882352940.695
316076AC2-137 E
50/50
1.5391.539
957492AF2-043 E
Adder
0.61647058823529410.524
923852AB2-025 E
Adder
0.47411764705882360.403
923842AB2-024 E
Adder
1.02235294117647070.869
316157AD2-030 E
Adder
0.64705882352941180.55
964211AG1-282 C
Adder
1.02941176470588250.875
961941AG1-037 C
Adder
0.192941176470588250.164
961942AG1-037 E
Adder
0.129411764705882370.11
935162AD1-151 E
Adder
5.6729411764705884.822
3150691DARBY 3
50/50
5.1615.161
938532AE1-072 E
Adder
3.9270588235294123.338
3146326AYDLETT TAP
Adder
0.58117647058823530.494
943461AF1-017 C
Adder
0.620.527
316311AC2-079 C
Adder
2.622.227
3142366NRTHEST
50/50
0.4150.415
961611AG1-000B C
Adder
7.94235294117647156.751
3138116ELKO L286
50/50
1.6051.605
940541AE2-040 C
Adder
1.1717647058823530.996
940482AE2-033 E
Adder
4.4188235294117653.756
940481AE2-033 C
Adder
6.5541176470588235.571
963611AG1-210 C
Adder
0.33176470588235290.282
940641AE2-051 C
Adder
5.8941176470588235.01
316084AB2-161 E
Adder
2.7223529411764712.314
926785AC1-164_E
50/50
11.42911.429
943471AF1-018 C
Adder
4.0035294117647063.403
3145946PLYMOUTH TP
Adder
0.128235294117647060.109
933982AD1-022 E
Adder
1.87647058823529411.595
926472AC1-118 E
Adder
0.448235294117647070.381
3150731STONECA
Adder
3.82941176470588253.255
932046AC2-012 E
Adder
5.74352941176470564.882
935161AD1-151 C
Adder
8.5094117647058837.233
3150701DARBY 4
50/50
5.1675.167
938531AE1-072 C
Adder
7.5329411764705886.403
958161AF2-110 C
Adder
0.59882352941176480.509
3145393UNCAMP
Adder
2.522.142
933981AD1-022 C
Adder
3.44588235294117642.929
900672V4-068 E
Adder
0.13882352941176470.118
940642AE2-051 E
Adder
3.9294117647058823.34
3150681DARBY 2
50/50
5.1435.143
919153AA1-139 E2
Adder
1.75411764705882381.491
943462AF1-017 E
Adder
1.0117647058823530.86
942341AE2-247 C
Adder
0.68588235294117650.583
958162AF2-110 E
Adder
0.95294117647058830.81
924516AB2-100 E1
Adder
1.11411764705882340.947
934512AD1-075 E
Adder
1.69882352941176461.444
934502AD1-074 E
Adder
6.7941176470588245.775
966621AG1-532 C
Adder
0.51647058823529410.439
918512AA1-065 E OP
Adder
2.1329411764705881.813
963612AG1-210 E
Adder
0.49764705882352940.423
3150861SPRUNCD
50/50
0.1930.193
942002AE2-212 E
Adder
0.82117647058823530.698
940431AE2-027 C
Adder
8.0694117647058836.859
944581AF1-123 C
Adder
19.5729411764705916.637
941101AE2-104 C
Adder
1.4682352941176471.248
934392AD1-063 E
Adder
0.60.51
943742AF1-042 E
Adder
2.45411764705882352.086
962862AG1-135 E
Adder
2.06235294117647071.753
966662AG1-536 E
Adder
3.6694117647058833.119
316141AB2-099 E
Adder
0.096470588235294130.082
3150851SPRUNCC
50/50
0.1930.193
939411AE1-173 C
Adder
32.84941176470588427.922
940432AE2-027 E
Adder
5.3800000000000014.573
934012AD1-025 E
Adder
5.1988235294117644.419
3150671DARBY 1
50/50
5.1375.137
913392Y1-086 E
Adder
0.93647058823529420.796
939612AE1-191 E
Adder
3.16117647058823532.687
957602AF2-054 E
Adder
0.76823529411764710.653
966661AG1-536 C
Adder
2.7305882352941182.321
958262AF2-120 E
Adder
2.1164705882352941.799
316078AC2-138 E
Adder
0.46470588235294120.395
933292AC2-141 E
Adder
5.5482352941176484.716
946262AF1-291 E
Adder
0.86941176470588230.739
3150651CHESTF6
Adder
11.472941176470599.752
944602AF1-125 E
Adder
44.11647058823529537.499
3145506HICKORY
Adder
0.93882352941176480.798
934576AD1-082 E
Adder
2.16941176470588241.844
957871AF2-081 C
Adder
4.2894117647058823.646
943612AF1-032 E
Adder
0.40.34
3130536PAPERMILL
Adder
3.7670588235294123.202
939602AE1-190 E
Adder
0.79058823529411770.672
940492AE2-034 E
Adder
1.24588235294117641.059
934522AD1-076 E
Adder
2.47058823529411782.1
936591AD2-074 C
Adder
2.8741176470588242.443
943172AE2-346 E
Adder
0.231764705882352960.197
3143316POE
Adder
0.69294117647058820.589
939191AE1-149 C
Adder
5.5294117647058834.7
901082W1-029 E
Adder
13.50705882352941211.481
934146AD1-041 E
Adder
1.97529411764705891.679
957601AF2-054 C
Adder
1.15294117647058810.98
958261AF2-120 C
Adder
3.17411764705882372.698
932596AC2-079 E
Adder
4.2752941176470593.634
917122Z2-027 E
Adder
0.57058823529411760.485
957832AF2-077 E
Adder
0.74235294117647070.631
940551AE2-041 C
Adder
4.0035294117647063.403
920692AA2-178 E
Adder
1.66000000000000011.411
966622AG1-532 E
Adder
0.343529411764705860.292
941591AE2-156 C
Adder
7.8423529411764716.666
925332AB2-190 E
Adder
4.3082352941176473.662
944591AF1-124 C
Adder
19.64235294117647316.696
944601AF1-125 C
Adder
19.27176470588235416.381
927226AC1-216 E
Adder
4.0164705882352943.414
3150601CHESTF5
Adder
33.5858823529411828.548
936666AD2-085 E
Adder
2.5811764705882352.194
962962AG1-145 E
Adder
0.78470588235294130.667
938771AE1-103 C
Adder
1.22588235294117661.042
3145413WATKINS
Adder
0.28235294117647060.24
960081AF2-299 C
Adder
0.68823529411764710.585
964212AG1-282 E
Adder
0.68588235294117650.583
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.4653.465
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.1394.139
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.590.59
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
1.5041.504
CBM South 2LTFEXP_CBM-S2->PJM
CBM
24.58824.588
CPLELTFEXP_CPLE->PJM
CLTF
3.1573.157
LAGNLTFEXP_LAGN->PJM
CLTF
1.5871.587
TVALTFEXP_TVA->PJM
CLTF
1.2281.228
O66PJM->LTFIMP_O-066
CMTX_NF
6.1076.107
G-007PJM->LTFIMP_G-007
CMTX_NF
0.9570.957
SIGELTFEXP_SIGE->PJM
CLTF
0.0340.034
NYPJM->LTFIMP_NY
CLTF
0.4630.463
LGEELTFEXP_LGEE->PJM
CLTF
0.150.15
WECLTFEXP_WEC->PJM
CLTF
0.0770.077

Details for 8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:136.2 %
Rating:2442.12 MVA
Rating Type:B
MVA to Mitigate:3326.15
MW Contribution:14.45
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:145.97 %
Rating:2442.12 MVA
Rating Type:B
MVA to Mitigate:3564.81
MW Contribution:14.51
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
939411AE1-173 C
50/50
137.269137.269
933292AC2-141 E
50/50
24.37824.378
316294AC1-161 C
50/50
9.3329.332
944602AF1-125 E
50/50
179.158179.158
916191Z1-068 C
50/50
0.0760.076
3145506HICKORY
50/50
3.8083.808
934576AD1-082 E
Adder
5.9741176470588245.078
957871AF2-081 C
50/50
17.30217.302
943612AF1-032 E
50/50
1.5651.565
3130536PAPERMILL
Adder
9.9929411764705888.494
939602AE1-190 E
Adder
2.1164705882352941.799
940492AE2-034 E
Adder
4.8058823529411764.085
934522AD1-076 E
Adder
9.4435294117647068.027
936591AD2-074 C
Adder
7.8788235294117656.697
943172AE2-346 E
Adder
0.85647058823529410.728
918492AA1-063AE OP
Adder
5.464705882352944.645
917332KELFORD E
Adder
2.25294117647058821.915
925122AB2-169 E
Adder
8.1847058823529426.957
3150981CHESPKA
50/50
0.7560.756
944581AF1-123 C
50/50
79.48679.486
316185AD1-033 C
50/50
2.1522.152
941101AE2-104 C
50/50
5.4755.475
316320Y1-086 C
50/50
0.3740.374
934392AD1-063 E
Adder
1.61529411764705881.373
943742AF1-042 E
Adder
6.7258823529411765.717
962862AG1-135 E
Adder
5.63764705882352954.792
966662AG1-536 E
Adder
10.0188235294117658.516
316088AB2-174 E
Adder
8.1305882352941186.911
316141AB2-099 E
Adder
0.35647058823529410.303
923994AB2-040_E
Adder
7.7152941176470586.558
939412AE1-173 E
50/50
91.51291.512
941032AE2-094 E
Adder
23.3529411764705919.85
941031AE2-094 C
Adder
52.14117647058823544.32
926662AC1-147 E
50/50
2.2972.297
916192Z1-068 E
50/50
3.2743.274
316076AC2-137 E
Adder
1.64117647058823551.395
957492AF2-043 E
50/50
2.4072.407
923852AB2-025 E
Adder
1.42470588235294131.211
923842AB2-024 E
Adder
2.7035294117647062.298
316157AD2-030 E
Adder
1.7917647058823531.523
964211AG1-282 C
Adder
2.76588235294117672.351
961941AG1-037 C
Adder
0.71294117647058820.606
961942AG1-037 E
Adder
0.475294117647058870.404
944011AF1-069 C
Adder
17.03647058823529314.481
3151091ELIZAR2
50/50
5.4685.468
3151081ELIZAR1
50/50
5.5655.565
941591AE2-156 C
50/50
31.07431.074
925332AB2-190 E
Adder
10.335294117647068.785
944591AF1-124 C
50/50
79.76979.769
944601AF1-125 C
50/50
78.26278.262
316316AC1-027 C
50/50
0.550.55
927226AC1-216 E
Adder
10.5317647058823528.952
3150601CHESTF5
Adder
72.936470588235361.996
936666AD2-085 E
Adder
8.5588235294117647.275
962962AG1-145 E
50/50
2.4882.488
963041AG1-153 C
Adder
7.1717647058823536.096
938771AE1-103 C
Adder
4.5305882352941173.851
3145413WATKINS
Adder
1.03764705882352940.882
960081AF2-299 C
Adder
2.3023529411764711.957
964212AG1-282 E
Adder
1.84352941176470591.567
926072AC1-086 E
Adder
12.19176470588235310.363
944012AF1-069 E
Adder
6.6188235294117655.626
925865AC1-065 E
Adder
24.48470588235294420.812
961951AG1-038 C
Adder
4.5564705882352943.873
961952AG1-038 E
Adder
6.2929411764705885.349
946282AF1-292 E
Adder
1.27058823529411781.08
934012AD1-025 E
Adder
13.63529411764705811.59
913392Y1-086 E
50/50
3.7343.734
939612AE1-191 E
Adder
8.4670588235294127.197
3156116Z1-036WIND
50/50
1.0631.063
957602AF2-054 E
Adder
2.12823529411764721.809
966661AG1-536 C
Adder
7.4564705882352956.338
958262AF2-120 E
Adder
5.7788235294117654.912
316078AC2-138 E
Adder
1.26470588235294111.075
3137643SOCKMAN
Adder
0.90352941176470590.768
926755AC1-161 E
50/50
24.37824.378
933291AC2-141 C
50/50
57.10857.108
925522AC1-027 E
50/50
2.1192.119
944631AF1-128 C
Adder
31.06000000000000226.401
3151161SURRY 1
50/50
37.9237.92
957872AF2-081 E
50/50
7.4157.415
3145256KINGFORK
50/50
1.7041.704
3150921YORKTN3
50/50
212.818212.818
316305AF2-043 C
50/50
0.590.59
316160AE1-175 E
50/50
2.0532.053
941102AE2-104 E
50/50
8.7058.705
936592AD2-074 E
Adder
12.85529411764705910.927
926214AC1-099 E
Adder
1.56235294117647071.328
932632AC2-084 E
Adder
4.183.553
939191AE1-149 C
Adder
13.30705882352941111.311
316159AE1-175 C
50/50
0.6760.676
901082W1-029 E
50/50
53.16253.162
934146AD1-041 E
Adder
5.2917647058823534.498
957601AF2-054 C
Adder
3.1929411764705882.714
958261AF2-120 C
Adder
8.6682352941176477.368
926206AC1-098 E
Adder
4.72941176470588154.02
3152331SURRY 2
50/50
50.93450.934
935162AD1-151 E
Adder
14.19058823529411712.062
938532AE1-072 E
50/50
15.80515.805
3146326AYDLETT TAP
50/50
2.3362.336
943461AF1-017 C
Adder
2.05764705882352941.749
316311AC2-079 C
Adder
8.827.497
932596AC2-079 E
Adder
14.39058823529411812.232
917122Z2-027 E
50/50
2.2672.267
3156056W1-029WIND
50/50
1.2961.296
957832AF2-077 E
50/50
2.3562.356
940551AE2-041 C
Adder
10.7682352941176489.153
920692AA2-178 E
Adder
6.4070588235294125.446
966622AG1-532 E
Adder
1.1517647058823530.979
939192AE1-149 E
Adder
8.8705882352941187.54
3150991CHESPKB
50/50
1.2531.253
934065AD1-033 E
50/50
8.788.78
939312AE1-162 E
50/50
2.3092.309
937226AE2-253 E
50/50
10.1510.15
316321Z2-027 C
50/50
0.6140.614
924517AB2-100 E2
Adder
3.61411764705882373.072
934501AD1-074 C
Adder
51.01411764705882543.362
943741AF1-042 C
Adder
4.122352941176473.504
962861AG1-135 C
Adder
8.4564705882352957.188
3141813NORNECK
Adder
1.20352941176470571.023
316036AC1-147 C
50/50
0.6390.639
924814AB2-134 E
Adder
17.2517647058823514.664
919152AA1-139 E1
50/50
7.0757.075
316018AA1-139 ULT2
50/50
1.8731.873
942342AE2-247 E
Adder
3.142.669
920042AA2-088 E OP
Adder
15.25058823529411712.963
934511AD1-075 C
Adder
12.75411764705882310.841
934521AD1-076 C
Adder
18.52705882352941215.748
3145723EMPORIA
Adder
0.53411764705882360.454
939246AE1-155 E
Adder
12.06941176470588310.259
923573AB1-173 E OP
Adder
4.1152941176470593.498
919692AA2-053 E OP
Adder
5.50588235294117644.68
3151101ELIZAR3
50/50
5.6365.636
944582AF1-123 E
50/50
182.015182.015
944592AF1-124 E
50/50
182.674182.674
3144216WINCHST
50/50
0.2310.231
935112AD1-144 E
50/50
1.5821.582
316349AD2-085 C
Adder
5.2458823529411764.459
316169AC1-164 GEN
50/50
61.5761.57
923832AB2-022 E
50/50
2.1082.108
963042AG1-153 E
Adder
10.757647058823539.144
938772AE1-103 E
Adder
6.257647058823535.319
916042Z1-036 E
50/50
46.21946.219
946281AF1-292 C
Adder
1.90588235294117661.62
960082AF2-299 E
Adder
1.53529411764705871.305
926071AC1-086 C
Adder
26.78823529411764822.77
316375AC2-012 C
50/50
2.3432.343
316236AE1-162 C
50/50
0.5660.566
961611AG1-000B C
Adder
23.74470588235294220.183
3138116ELKO L286
Adder
1.71058823529411771.454
313526AB2-022 C
50/50
0.640.64
940541AE2-040 C
Adder
3.5223529411764712.994
940482AE2-033 E
Adder
13.4152941176470611.403
940481AE2-033 C
Adder
19.89882352941176816.914
957831AF2-077 C
50/50
0.5460.546
963611AG1-210 C
Adder
0.90352941176470590.768
923263AB1-132 E OP
Adder
7.79647058823529456.627
940641AE2-051 C
50/50
24.9624.96
316084AB2-161 E
Adder
7.497647058823536.373
316072AD1-144 C
50/50
0.4730.473
926785AC1-164_E
50/50
27.66227.662
943471AF1-018 C
Adder
10.7682352941176489.153
3145946PLYMOUTH TP
Adder
0.491764705882352940.418
933982AD1-022 E
Adder
7.1294117647058826.06
932046AC2-012 E
50/50
22.72422.724
935161AD1-151 C
Adder
21.28588235294117618.093
316017AA1-139 ULT1
50/50
1.8731.873
938531AE1-072 C
50/50
30.31830.318
958161AF2-110 C
50/50
2.2342.234
3145393UNCAMP
Adder
9.2964705882352947.902
933981AD1-022 C
Adder
13.0952941176470611.131
900672V4-068 E
Adder
0.50705882352941180.431
940642AE2-051 E
50/50
16.6416.64
316388AE2-253 GEN
50/50
3.4133.413
919153AA1-139 E2
50/50
7.0757.075
943462AF1-017 E
Adder
3.35647058823529452.853
942341AE2-247 C
Adder
2.2741176470588241.933
316246AF1-032 C
50/50
0.4820.482
316382AG1-145 C
50/50
0.610.61
958162AF2-110 E
50/50
3.5543.554
924516AB2-100 E1
Adder
3.61411764705882373.072
934512AD1-075 E
Adder
6.4917647058823525.518
934502AD1-074 E
Adder
25.96941176470588522.074
966621AG1-532 C
Adder
1.72705882352941181.468
918512AA1-065 E OP
Adder
7.9635294117647066.769
963612AG1-210 E
Adder
1.35529411764705881.152
918532AA1-067 E
Adder
0.94588235294117650.804
CBM West 1LTFEXP_CBM-W1->PJM
CBM
15.55415.554
CBM West 2LTFEXP_CBM-W2->PJM
CBM
16.85316.853
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
2.4842.484
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
5.8765.876
CBM South 2LTFEXP_CBM-S2->PJM
CBM
96.69696.696
CPLELTFEXP_CPLE->PJM
CLTF
12.33712.337
LAGNLTFEXP_LAGN->PJM
CLTF
6.3726.372
TVALTFEXP_TVA->PJM
CLTF
4.9324.932
O66PJM->LTFIMP_O-066
CMTX_NF
21.46821.468
G-007PJM->LTFIMP_G-007
CMTX_NF
3.3653.365
SIGELTFEXP_SIGE->PJM
CLTF
0.1430.143
NYPJM->LTFIMP_NY
CLTF
1.6271.627
LGEELTFEXP_LGEE->PJM
CLTF
0.6520.652
WECLTFEXP_WEC->PJM
CLTF
0.3380.338

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 576_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:115.81 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4713.58
MW Contribution:15.68
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 576_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:137.16 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:5582.72
MW Contribution:No Reportable Contribution
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
933292AC2-141 E
50/50
22.27722.277
316294AC1-161 C
50/50
8.5288.528
946262AF1-291 E
Adder
2.34117647058823541.99
3150651CHESTF6
Adder
30.4035294117647125.843
944602AF1-125 E
Adder
172.25764705882355146.419
3145506HICKORY
Adder
3.66705882352941173.117
934576AD1-082 E
Adder
7.1941176470588246.115
957871AF2-081 C
Adder
16.73529411764705814.225
943612AF1-032 E
Adder
1.54117647058823541.31
3130536PAPERMILL
Adder
11.0400000000000019.384
939602AE1-190 E
Adder
2.33764705882352961.987
940492AE2-034 E
Adder
4.8823529411764714.15
934522AD1-076 E
Adder
9.7164705882352948.259
936591AD2-074 C
Adder
8.5505882352941187.268
943172AE2-346 E
Adder
0.91294117647058830.776
918492AA1-063AE OP
Adder
6.0129411764705885.111
917332KELFORD E
Adder
2.43058823529411772.066
925122AB2-169 E
Adder
8.6200000000000017.327
942002AE2-212 E
Adder
2.31764705882352961.97
940431AE2-027 C
Adder
21.05411764705882417.896
944581AF1-123 C
Adder
76.4247058823529464.961
941101AE2-104 C
Adder
5.5447058823529414.713
934392AD1-063 E
Adder
1.77411764705882361.508
943742AF1-042 E
Adder
7.3000000000000016.205
962862AG1-135 E
Adder
6.1188235294117645.201
966662AG1-536 E
Adder
10.8741176470588249.243
316088AB2-174 E
Adder
9.3494117647058837.947
316141AB2-099 E
Adder
0.380.323
923994AB2-040_E
Adder
8.8282352941176477.504
3150831SPRUNCA
Adder
14.5823529411764712.395
3150841SPRUNCB
Adder
14.5823529411764712.395
939412AE1-173 E
Adder
91.772941176470678.007
941032AE2-094 E
Adder
24.70588235294117821
941031AE2-094 C
Adder
55.1635294117647146.889
926662AC1-147 E
Adder
2.2364705882352941.901
916192Z1-068 E
Adder
3.16941176470588242.694
316076AC2-137 E
50/50
2.32.3
957492AF2-043 E
Adder
2.37058823529411772.015
923852AB2-025 E
Adder
1.7117647058823531.455
966872AG1-558 E
Adder
1.88235294117647081.6
966871AG1-558 C
Adder
3.73647058823529443.176
923842AB2-024 E
Adder
2.99058823529411732.542
316157AD2-030 E
Adder
1.94470588235294131.653
964211AG1-282 C
Adder
3.02000000000000052.567
961941AG1-037 C
Adder
0.76117647058823530.647
961942AG1-037 E
Adder
0.50705882352941180.431
944011AF1-069 C
Adder
18.02352941176470615.32
941591AE2-156 C
Adder
30.2317647058823525.697
925332AB2-190 E
Adder
13.54588235294117611.514
944591AF1-124 C
Adder
76.6964705882352965.192
944601AF1-125 C
Adder
75.2470588235294163.96
927226AC1-216 E
Adder
12.9976470588235311.048
3150601CHESTF5
50/50
107.532107.532
936666AD2-085 E
Adder
9.244705882352947.858
962962AG1-145 E
50/50
2.5352.535
963041AG1-153 C
Adder
7.67882352941176556.527
938771AE1-103 C
Adder
4.6882352941176473.985
3145413WATKINS
Adder
1.08705882352941190.924
960081AF2-299 C
Adder
2.6764705882352942.275
964212AG1-282 E
Adder
2.01294117647058851.711
944012AF1-069 E
Adder
7.0023529411764715.952
3150621CHESTS7
50/50
3.0123.012
3150611CHESTG7
50/50
6.5626.562
316075AC2-137 C
50/50
0.6540.654
925865AC1-065 E
Adder
27.3976470588235323.288
961951AG1-038 C
Adder
4.9458823529411764.204
961952AG1-038 E
Adder
6.8294117647058825.805
946282AF1-292 E
Adder
1.47764705882352951.256
939411AE1-173 C
Adder
137.65882352941176117.01
940432AE2-027 E
Adder
14.03647058823529311.931
934012AD1-025 E
Adder
16.82705882352941314.303
913392Y1-086 E
Adder
3.6470588235294123.1
939612AE1-191 E
Adder
9.3494117647058837.947
957602AF2-054 E
Adder
2.31058823529411761.964
966661AG1-536 C
Adder
8.0929411764705876.879
958262AF2-120 E
Adder
6.2717647058823545.331
316078AC2-138 E
Adder
1.37294117647058831.167
938552AE1-074 E
Adder
1.90000000000000011.615
926755AC1-161 E
50/50
22.27722.277
933291AC2-141 C
50/50
52.18752.187
925522AC1-027 E
Adder
2.05294117647058851.745
944631AF1-128 C
50/50
67.28467.284
957872AF2-081 E
Adder
7.1717647058823536.096
3145256KINGFORK
Adder
1.70470588235294131.449
3150921YORKTN3
50/50
208.205208.205
316160AE1-175 E
50/50
2.0922.092
316312AB1-027 C
50/50
0.8920.892
941102AE2-104 E
Adder
8.815294117647067.493
936592AD2-074 E
Adder
13.95176470588235211.859
3143316POE
Adder
2.15411764705882371.831
939191AE1-149 C
Adder
17.43176470588235514.817
316159AE1-175 C
50/50
0.6890.689
901082W1-029 E
Adder
52.4682352941176544.598
934146AD1-041 E
Adder
5.8435294117647054.967
957601AF2-054 C
Adder
3.4647058823529412.945
958261AF2-120 C
Adder
9.4070588235294137.996
316233AE1-074 C
Adder
3.7705882352941183.205
3152331SURRY 2
50/50
44.51344.513
935162AD1-151 E
Adder
18.0752941176470615.364
3150691DARBY 3
50/50
4.2724.272
938532AE1-072 E
Adder
15.31411764705882413.017
3146326AYDLETT TAP
Adder
2.26588235294117621.926
943461AF1-017 C
Adder
2.2223529411764711.889
316311AC2-079 C
Adder
9.4458823529411768.029
932596AC2-079 E
Adder
15.41176470588235313.1
917122Z2-027 E
Adder
2.22117647058823531.888
957832AF2-077 E
Adder
2.41411764705882352.052
927042AC1-191 E
Adder
7.4741176470588236.353
940551AE2-041 C
Adder
11.82823529411764710.054
920692AA2-178 E
Adder
6.5094117647058835.533
966622AG1-532 E
Adder
1.33882352941176451.138
942001AE2-212 C
Adder
3.4764705882352942.955
939192AE1-149 E
Adder
11.6211764705882359.878
934065AD1-033 E
Adder
8.4505882352941187.183
939312AE1-162 E
Adder
2.4211764705882352.058
937226AE2-253 E
Adder
9.88.33
316004AC1-112 C
50/50
0.5560.556
924517AB2-100 E2
Adder
4.20352941176470553.573
934501AD1-074 C
Adder
52.4929411764705944.619
943741AF1-042 C
Adder
4.4741176470588243.803
962861AG1-135 C
Adder
9.177647058823537.801
3141813NORNECK
Adder
1.30588235294117671.11
316240AF1-291 C
Adder
3.5117647058823532.985
944641AF1-129 C
Adder
166.98352941176472141.936
924814AB2-134 E
Adder
21.28941176470588218.096
3150641CHESTS8
50/50
3.3243.324
919152AA1-139 E1
Adder
6.8435294117647065.817
942342AE2-247 E
Adder
3.39176470588235322.883
920042AA2-088 E OP
Adder
16.25647058823529513.818
934511AD1-075 C
Adder
13.12352941176470511.155
934521AD1-076 C
Adder
19.0647058823529416.205
3145723EMPORIA
Adder
0.61764705882352940.525
939246AE1-155 E
Adder
13.111.135
923573AB1-173 E OP
Adder
4.7082352941176474.002
944582AF1-123 E
Adder
175.0035294117647148.753
944592AF1-124 E
Adder
175.63764705882355149.292
3150631CHESTG8
50/50
6.4576.457
3144216WINCHST
50/50
0.2290.229
935112AD1-144 E
Adder
1.58235294117647051.345
316349AD2-085 C
Adder
5.6658823529411774.816
930122AB1-027 E
50/50
2.342.34
316169AC1-164 GEN
50/50
71.02671.026
923832AB2-022 E
Adder
2.0588235294117651.75
963042AG1-153 E
Adder
11.517647058823539.79
938772AE1-103 E
Adder
6.4741176470588245.503
916042Z1-036 E
Adder
46.2035294117647139.273
946281AF1-292 C
Adder
2.2152941176470591.883
960082AF2-299 E
Adder
1.78470588235294111.517
926071AC1-086 C
Adder
8.492941176470597.219
961611AG1-000B C
Adder
26.9129411764705922.876
3138116ELKO L286
50/50
2.3992.399
940541AE2-040 C
Adder
4.2317647058823533.597
940482AE2-033 E
Adder
16.0529411764705913.645
940481AE2-033 C
Adder
23.8117647058823520.24
927041AC1-191 C
Adder
15.00352941176470612.753
963611AG1-210 C
Adder
0.980.833
940641AE2-051 C
Adder
25.38941176470588321.581
316084AB2-161 E
Adder
9.0294117647058827.675
926785AC1-164_E
50/50
31.9131.91
943471AF1-018 C
Adder
11.82823529411764710.054
3145946PLYMOUTH TP
Adder
0.50470588235294120.429
933982AD1-022 E
Adder
7.3811764705882366.274
3150731STONECA
Adder
11.5258823529411789.797
932046AC2-012 E
Adder
22.12352941176470718.805
935161AD1-151 C
Adder
27.11411764705882623.047
3150701DARBY 4
50/50
4.2774.277
938531AE1-072 C
Adder
29.3776470588235324.971
958161AF2-110 C
Adder
2.2623529411764711.923
3145393UNCAMP
Adder
9.664705882352948.215
933981AD1-022 C
Adder
13.55882352941176611.525
900672V4-068 E
Adder
0.54235294117647060.461
940642AE2-051 E
Adder
16.92588235294117614.387
3150681DARBY 2
50/50
4.2574.257
919153AA1-139 E2
Adder
6.8435294117647065.817
943462AF1-017 E
Adder
3.62470588235294143.081
942341AE2-247 C
Adder
2.4552941176470592.087
316382AG1-145 C
50/50
0.6220.622
926412AC1-112 E
50/50
1.9031.903
958162AF2-110 E
Adder
3.5988235294117653.059
924516AB2-100 E1
Adder
4.20352941176470553.573
934512AD1-075 E
Adder
6.685.678
934502AD1-074 E
Adder
26.72117647058823722.713
966621AG1-532 C
Adder
2.00705882352941161.706
918512AA1-065 E OP
Adder
8.397647058823537.138
963612AG1-210 E
Adder
1.47058823529411781.25
CBM West 1LTFEXP_CBM-W1->PJM
CBM
45.3345.33
CBM West 2LTFEXP_CBM-W2->PJM
CBM
30.55730.557
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
5.5435.543
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
7.017.01
CBM South 2LTFEXP_CBM-S2->PJM
CBM
122.912122.912
LAGNLTFEXP_LAGN->PJM
CLTF
10.28110.281
CPLELTFEXP_CPLE->PJM
CLTF
14.714.7
TVALTFEXP_TVA->PJM
CLTF
8.1358.135
O66PJM->LTFIMP_O-066
CMTX_NF
43.443.4
G-007PJM->LTFIMP_G-007
CMTX_NF
6.8256.825
SIGELTFEXP_SIGE->PJM
CLTF
0.3490.349
NYPJM->LTFIMP_NY
CLTF
3.1153.115
LGEELTFEXP_LGEE->PJM
CLTF
1.8191.819
WECLTFEXP_WEC->PJM
CLTF
0.9390.939

Details for 8LADYSMITH-8KRAKEN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
8LADYSMITH-8KRAKEN 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 581_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:113.6 %
Rating:3220.44 MVA
Rating Type:B
MVA to Mitigate:3658.55
MW Contribution:12.37
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
942001AE2-212 C
Adder
2.4364705882352942.071
939192AE1-149 E
Adder
7.9023529411764716.717
934065AD1-033 E
Adder
5.4035294117647064.593
939312AE1-162 E
Adder
1.5964705882352941.357
937226AE2-253 E
Adder
6.2658823529411765.326
3142296MT RD221
50/50
0.1630.163
316004AC1-112 C
50/50
0.4320.432
3150471FOUR RIVERE
50/50
4.3614.361
958502AF2-144 E
Adder
1.0717647058823530.911
924517AB2-100 E2
Adder
2.69764705882352952.293
934501AD1-074 C
Adder
33.50117647058823428.476
943741AF1-042 C
Adder
3.4588235294117652.94
962861AG1-135 C
Adder
7.2058823529411776.125
3141813NORNECK
Adder
1.05058823529411760.893
938552AE1-074 E
Adder
1.32352941176470581.125
926755AC1-161 E
Adder
14.11411764705882511.997
933291AC2-141 C
Adder
33.06352941176470528.104
925522AC1-027 E
Adder
1.3152941176470591.118
944631AF1-128 C
Adder
48.5670588235294141.282
957872AF2-081 E
Adder
4.58588235294117653.898
3145256KINGFORK
Adder
1.10588235294117650.94
3150921YORKTN3
Adder
139.0764705882353118.215
316160AE1-175 E
Adder
1.4270588235294121.213
316312AB1-027 C
50/50
0.6940.694
941102AE2-104 E
Adder
5.69058823529411754.837
315052AA1-145 CT2
50/50
7.0467.046
938562AE1-075 E
Adder
0.92941176470588240.79
936592AD2-074 E
Adder
10.7858823529411769.168
3150411LDYSMT5
50/50
7.2687.268
934782AD1-105 E
Adder
6.1211764705882365.203
3150831SPRUNCA
Adder
10.5929411764705879.004
3150841SPRUNCB
Adder
10.5929411764705879.004
939412AE1-173 E
Adder
56.8788235294117748.347
941032AE2-094 E
Adder
15.02823529411764612.774
941031AE2-094 C
Adder
33.5552941176470628.522
926662AC1-147 E
Adder
1.43647058823529421.221
916192Z1-068 E
Adder
2.0305882352941181.726
316076AC2-137 E
Adder
1.6835294117647061.431
957492AF2-043 E
Adder
1.52235294117647071.294
923852AB2-025 E
Adder
1.10705882352941170.941
966872AG1-558 E
50/50
1.6071.607
966871AG1-558 C
50/50
3.1913.191
923842AB2-024 E
Adder
2.16941176470588241.844
923862AB2-026 E
Adder
1.09058823529411760.927
316157AD2-030 E
Adder
1.4152941176470591.203
964211AG1-282 C
Adder
2.3988235294117652.039
961941AG1-037 C
Adder
0.485882352941176430.413
961942AG1-037 E
Adder
0.32352941176470590.275
3142366NRTHEST
50/50
0.2360.236
961611AG1-000B C
Adder
18.15411764705882215.431
3138116ELKO L286
Adder
1.75647058823529421.493
940541AE2-040 C
Adder
2.73647058823529442.326
940482AE2-033 E
Adder
10.3694117647058828.814
940481AE2-033 C
Adder
15.38117647058823513.074
927041AC1-191 C
50/50
12.81112.811
3150371LDYSMT1
50/50
6.9556.955
963611AG1-210 C
Adder
0.78823529411764710.67
940641AE2-051 C
Adder
15.55529411764705813.222
316084AB2-161 E
Adder
6.0470588235294125.14
926785AC1-164_E
Adder
22.7847058823529419.367
943471AF1-018 C
Adder
8.5917647058823537.303
3145946PLYMOUTH TP
Adder
0.32235294117647060.274
933982AD1-022 E
Adder
4.7105882352941174.004
926472AC1-118 E
Adder
1.221.037
942002AE2-212 E
Adder
1.62470588235294121.381
940431AE2-027 C
Adder
14.94470588235294212.703
944581AF1-123 C
Adder
48.8541176470588341.526
941101AE2-104 C
Adder
3.57882352941176453.042
3150461FOUR RIVERD
50/50
4.3614.361
934392AD1-063 E
Adder
1.28823529411764711.095
943742AF1-042 E
Adder
5.6435294117647064.797
962862AG1-135 E
Adder
4.8047058823529414.084
966662AG1-536 E
Adder
8.587.293
316088AB2-174 E
Adder
5.9647058823529415.07
316141AB2-099 E
Adder
0.242352941176470580.206
923994AB2-040_E
Adder
5.6294117647058834.785
944492AF1-114 E
Adder
9.1505882352941177.778
939411AE1-173 C
Adder
85.3176470588235272.52
940432AE2-027 E
Adder
9.9623529411764718.468
934012AD1-025 E
Adder
11.569.826
913392Y1-086 E
Adder
2.33294117647058831.983
3150451FOUR RIVERC
50/50
5.4065.406
939612AE1-191 E
Adder
6.8023529411764715.782
957602AF2-054 E
Adder
1.68117647058823551.429
966661AG1-536 C
Adder
6.3847058823529415.427
958262AF2-120 E
Adder
4.9482352941176484.206
316078AC2-138 E
Adder
1.10352941176470590.938
944491AF1-114 C
Adder
6.6258823529411775.632
933292AC2-141 E
Adder
14.11411764705882511.997
946262AF1-291 E
Adder
1.67294117647058821.422
3150651CHESTF6
Adder
21.86235294117646818.583
944602AF1-125 E
Adder
110.112941176470693.596
3145506HICKORY
Adder
2.3435294117647061.992
934576AD1-082 E
Adder
4.8176470588235294.095
957871AF2-081 C
Adder
10.7011764705882359.096
943612AF1-032 E
Adder
0.98941176470588230.841
3150441FOUR RIVERB
50/50
4.4254.425
3130536PAPERMILL
Adder
8.0105882352941196.809
939602AE1-190 E
Adder
1.70117647058823531.446
940492AE2-034 E
Adder
3.11882352941176462.651
934522AD1-076 E
Adder
6.2011764705882355.271
936591AD2-074 C
Adder
6.6105882352941175.619
943172AE2-346 E
Adder
0.58235294117647060.495
918492AA1-063AE OP
Adder
3.83529411764705853.26
925122AB2-169 E
Adder
5.48117647058823554.659
940642AE2-051 E
Adder
10.3694117647058828.814
919153AA1-139 E2
Adder
4.3764705882352953.72
943462AF1-017 E
Adder
2.37411764705882342.018
942341AE2-247 C
Adder
1.6082352941176471.367
926412AC1-112 E
50/50
1.481.48
958162AF2-110 E
Adder
2.3235294117647061.975
924516AB2-100 E1
Adder
2.69764705882352952.293
934512AD1-075 E
Adder
4.2635294117647063.624
934502AD1-074 E
Adder
17.05411764705882414.496
966621AG1-532 C
Adder
1.28235294117647071.09
918512AA1-065 E OP
Adder
5.3564705882352944.553
963612AG1-210 E
Adder
1.18235294117647041.005
3150731STONECA
Adder
8.157647058823536.934
932046AC2-012 E
Adder
14.21176470588235412.08
935161AD1-151 C
Adder
18.74470588235294215.933
3150701DARBY 4
50/50
3.2653.265
938531AE1-072 C
Adder
18.7870588235294115.969
958161AF2-110 C
Adder
1.46000000000000021.241
3145393UNCAMP
Adder
6.2117647058823535.28
933981AD1-022 C
Adder
8.6517647058823537.354
900672V4-068 E
Adder
0.34588235294117650.294
316233AE1-074 C
Adder
2.6270588235294122.233
935162AD1-151 E
Adder
12.49647058823529410.622
3150691DARBY 3
50/50
3.2613.261
938532AE1-072 E
Adder
9.7941176470588228.325
3146326AYDLETT TAP
Adder
1.44941176470588241.232
943461AF1-017 C
Adder
1.4552941176470591.237
316311AC2-079 C
Adder
6.1752941176470585.249
932596AC2-079 E
Adder
10.0764705882352948.565
917122Z2-027 E
Adder
1.42117647058823531.208
957832AF2-077 E
Adder
1.67882352941176481.427
3150481FOUR RIVERF
50/50
5.3255.325
315051AA1-145 CT1
50/50
7.0497.049
927042AC1-191 E
50/50
6.3816.381
940551AE2-041 C
Adder
8.5917647058823537.303
920692AA2-178 E
Adder
4.1576470588235293.534
966622AG1-532 E
Adder
0.85529411764705890.727
3150381LDYSMT2
50/50
7.0467.046
316240AF1-291 C
Adder
2.5105882352941182.134
944641AF1-129 C
Adder
120.07411764705883102.063
924814AB2-134 E
Adder
14.62588235294117712.432
919152AA1-139 E1
Adder
4.3764705882352953.72
942342AE2-247 E
Adder
2.22117647058823531.888
920042AA2-088 E OP
Adder
10.4070588235294138.846
934511AD1-075 C
Adder
8.3752941176470597.119
934521AD1-076 C
Adder
12.16705882352941310.342
3145723EMPORIA
Adder
0.39411764705882360.335
939246AE1-155 E
Adder
10.3364705882352948.786
923573AB1-173 E OP
Adder
3.00235294117647072.552
957972AF2-091 E
Adder
3.1105882352941182.644
3143316POE
Adder
1.46235294117647091.243
939191AE1-149 C
Adder
11.85294117647058710.075
901082W1-029 E
Adder
33.6023529411764728.562
934146AD1-041 E
Adder
4.2517647058823533.614
957601AF2-054 C
Adder
2.5211764705882352.143
3150401LDYSMT4
50/50
7.2457.245
958261AF2-120 C
Adder
7.4223529411764716.309
944012AF1-069 E
Adder
4.2588235294117653.62
3150431FOUR RIVERA
50/50
4.4254.425
925865AC1-065 E
Adder
19.93176470588235516.942
939262AE1-157 E
50/50
11.49311.493
961951AG1-038 C
Adder
3.8235294117647063.25
961952AG1-038 E
Adder
5.2788235294117654.487
946282AF1-292 E
Adder
0.9435294117647060.802
936582AD2-073 E
Adder
1.24588235294117641.059
944582AF1-123 E
Adder
111.8694117647058995.089
944592AF1-124 E
Adder
112.2741176470588395.433
935112AD1-144 E
Adder
1.02705882352941180.873
316349AD2-085 C
Adder
3.71176470588235263.155
930122AB1-027 E
50/50
1.821.82
316169AC1-164 GEN
Adder
50.7141176470588243.107
923832AB2-022 E
Adder
1.31764705882352961.12
938772AE1-103 E
Adder
4.16470588235294153.54
916042Z1-036 E
Adder
29.55058823529411825.118
966882AG1-559 E
50/50
1.8071.807
939261AE1-157 C
50/50
21.18921.189
946281AF1-292 C
Adder
1.4152941176470591.203
960082AF2-299 E
Adder
1.140.969
3150391LDYSMT3
50/50
7.2317.231
926071AC1-086 C
Adder
1.16117647058823530.987
957971AF2-091 C
Adder
2.25294117647058821.915
944011AF1-069 C
Adder
10.9635294117647079.319
941591AE2-156 C
Adder
19.41529411764705816.503
925332AB2-190 E
Adder
9.4164705882352948.004
944591AF1-124 C
Adder
49.02705882352941641.673
944601AF1-125 C
Adder
48.1011764705882440.886
927226AC1-216 E
Adder
8.9282352941176487.589
3150601CHESTF5
Adder
77.6188235294117765.976
936666AD2-085 E
Adder
6.0552941176470595.147
962962AG1-145 E
Adder
1.73058823529411781.471
938771AE1-103 C
Adder
3.0152941176470592.563
3145413WATKINS
Adder
0.69764705882352940.593
966881AG1-559 C
50/50
3.5873.587
960081AF2-299 C
Adder
1.71058823529411771.454
964212AG1-282 E
Adder
1.59882352941176481.359
CBM West 1LTFEXP_CBM-W1->PJM
CBM
24.54824.548
CBM West 2LTFEXP_CBM-W2->PJM
CBM
17.76217.762
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
3.1253.125
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
4.3184.318
CBM South 2LTFEXP_CBM-S2->PJM
CBM
75.17775.177
CPLELTFEXP_CPLE->PJM
CLTF
9.069.06
LAGNLTFEXP_LAGN->PJM
CLTF
6.0826.082
TVALTFEXP_TVA->PJM
CLTF
4.8114.811
O66PJM->LTFIMP_O-066
CMTX_NF
33.64633.646
G-007PJM->LTFIMP_G-007
CMTX_NF
5.2915.291
SIGELTFEXP_SIGE->PJM
CLTF
0.1960.196
NYPJM->LTFIMP_NY
CLTF
2.4212.421
LGEELTFEXP_LGEE->PJM
CLTF
1.011.01
WECLTFEXP_WEC->PJM
CLTF
0.5150.515

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 552_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:105.29 %
Rating:3220.44 MVA
Rating Type:B
MVA to Mitigate:3390.96
MW Contribution:9.31
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 552_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:138.84 %
Rating:3220.44 MVA
Rating Type:B
MVA to Mitigate:4471.41
MW Contribution:No Reportable Contribution
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
933292AC2-141 E
Adder
12.22823529411764710.394
946262AF1-291 E
Adder
1.36823529411764721.163
3150651CHESTF6
Adder
17.73411764705882415.074
944602AF1-125 E
Adder
95.9941176470588381.595
3145506HICKORY
Adder
2.04352941176470631.737
934576AD1-082 E
Adder
4.1482352941176473.526
957871AF2-081 C
Adder
9.347.939
943612AF1-032 E
Adder
0.86235294117647050.733
3130536PAPERMILL
Adder
6.0070588235294125.106
939602AE1-190 E
Adder
1.29058823529411761.097
940492AE2-034 E
Adder
2.7635294117647062.349
936591AD2-074 C
Adder
4.9882352941176474.24
3152261N ANNA2
50/50
47.2747.27
3150861SPRUNCD
50/50
0.1580.158
942002AE2-212 E
Adder
1.36705882352941171.162
940431AE2-027 C
Adder
12.27647058823529510.435
944581AF1-123 C
Adder
42.58941176470588636.201
941101AE2-104 C
Adder
3.1211764705882352.653
934392AD1-063 E
Adder
0.97058823529411760.825
943742AF1-042 E
Adder
4.2588235294117653.62
962862AG1-135 E
Adder
3.6188235294117653.076
966662AG1-536 E
Adder
6.4588235294117655.49
3150831SPRUNCA
50/50
8.7958.795
3150841SPRUNCB
50/50
8.7958.795
939412AE1-173 E
50/50
55.04655.046
941032AE2-094 E
Adder
15.53882352941176513.208
941031AE2-094 C
Adder
34.69411764705882529.49
926662AC1-147 E
Adder
1.24588235294117641.059
916192Z1-068 E
Adder
1.76588235294117651.501
316076AC2-137 E
Adder
1.23411764705882351.049
957492AF2-043 E
Adder
1.32705882352941161.128
923852AB2-025 E
Adder
1.0352941176470590.88
966872AG1-558 E
Adder
1.10705882352941170.941
966871AG1-558 C
Adder
2.1964705882352941.867
923842AB2-024 E
Adder
1.62470588235294121.381
923862AB2-026 E
Adder
1.08941176470588250.926
316157AD2-030 E
Adder
1.07647058823529430.915
316044AC1-158 C1
50/50
15.00715.007
944011AF1-069 C
Adder
11.3364705882352949.636
941591AE2-156 C
Adder
16.84235294117647214.316
925332AB2-190 E
Adder
7.6305882352941186.486
944591AF1-124 C
Adder
42.74117647058823636.33
944601AF1-125 C
Adder
41.9329411764705935.643
927226AC1-216 E
Adder
7.2941176470588246.2
3150601CHESTF5
Adder
59.5223529411764750.594
936666AD2-085 E
Adder
5.2529411764705884.465
962962AG1-145 E
Adder
1.34235294117647071.141
963041AG1-153 C
Adder
4.8047058823529414.084
938771AE1-103 C
Adder
2.66470588235294152.265
3145413WATKINS
Adder
0.62117647058823530.528
966881AG1-559 C
Adder
2.14941176470588241.827
316170AC1-121 C
Adder
2.1788235294117651.852
316045AC1-158 C2
50/50
15.00715.007
944012AF1-069 E
Adder
4.4035294117647063.743
925865AC1-065 E
Adder
15.09882352941176512.834
316254AC1-120 C
Adder
6.3435294117647065.392
939262AE1-157 E
Adder
6.7447058823529415.733
961951AG1-038 C
Adder
2.88470588235294122.452
961952AG1-038 E
Adder
3.98470588235294133.387
3150851SPRUNCC
50/50
0.1580.158
939411AE1-173 C
50/50
82.56982.569
940432AE2-027 E
Adder
8.1835294117647066.956
934012AD1-025 E
Adder
9.442352941176478.026
913392Y1-086 E
Adder
2.041.734
939612AE1-191 E
Adder
5.162352941176474.388
957602AF2-054 E
Adder
1.27882352941176471.087
966661AG1-536 C
Adder
4.8058823529411764.085
958262AF2-120 E
Adder
3.7247058823529413.166
3152251N ANNA1
50/50
47.25147.251
316192AB2-158 C
50/50
1.8991.899
938552AE1-074 E
50/50
1.2191.219
926755AC1-161 E
Adder
12.22823529411764710.394
933291AC2-141 C
Adder
28.64705882352941324.35
925522AC1-027 E
Adder
1.1435294117647060.972
944631AF1-128 C
Adder
37.24352941176470531.657
957872AF2-081 E
Adder
4.0035294117647063.403
3145256KINGFORK
Adder
0.94941176470588240.807
3150921YORKTN3
Adder
111.6988235294117794.944
316160AE1-175 E
Adder
1.10705882352941170.941
941102AE2-104 E
Adder
4.9623529411764714.218
938562AE1-075 E
Adder
0.92941176470588240.79
936592AD2-074 E
Adder
8.1388235294117656.918
3143316POE
Adder
1.28352941176470581.091
939191AE1-149 C
Adder
10.152941176470598.63
901082W1-029 E
Adder
29.42941176470588325.015
934146AD1-041 E
Adder
3.22588235294117662.742
957601AF2-054 C
Adder
1.91764705882352931.63
958261AF2-120 C
Adder
5.5870588235294124.749
926739AC1-158 E1
50/50
39.12239.122
316233AE1-074 C
50/50
2.4192.419
935162AD1-151 E
Adder
10.1647058823529428.64
938532AE1-072 E
Adder
8.5517647058823547.269
3146326AYDLETT TAP
Adder
1.26470588235294111.075
943461AF1-017 C
Adder
1.26235294117647071.073
316311AC2-079 C
Adder
5.3611764705882364.557
932596AC2-079 E
Adder
8.7482352941176477.436
917122Z2-027 E
Adder
1.24470588235294131.058
957832AF2-077 E
Adder
1.31411764705882361.117
927042AC1-191 E
Adder
4.3941176470588243.735
940551AE2-041 C
Adder
6.4717647058823545.501
920692AA2-178 E
Adder
3.6835294117647063.131
942001AE2-212 C
Adder
2.0505882352941181.743
939192AE1-149 E
Adder
6.7682352941176475.753
934065AD1-033 E
Adder
4.7094117647058834.003
939312AE1-162 E
Adder
1.3482352941176471.146
937226AE2-253 E
Adder
5.4670588235294124.647
958502AF2-144 E
Adder
1.07058823529411760.91
924517AB2-100 E2
Adder
2.50705882352941162.131
934501AD1-074 C
Adder
29.82235294117647225.349
943741AF1-042 C
Adder
2.61058823529411742.219
962861AG1-135 C
Adder
5.42823529411764754.614
316240AF1-291 C
Adder
2.05294117647058851.745
944641AF1-129 C
Adder
97.3976470588235282.788
924814AB2-134 E
Adder
11.94705882352941210.155
919152AA1-139 E1
Adder
3.823.247
942342AE2-247 E
Adder
1.92705882352941171.638
926502AC1-121 E
Adder
1.02470588235294110.871
920042AA2-088 E OP
Adder
9.3552941176470597.952
934511AD1-075 C
Adder
3.1717647058823532.696
934521AD1-076 C
Adder
10.8305882352941179.206
939246AE1-155 E
Adder
7.7800000000000016.613
925022AB2-158 E
50/50
5.0315.031
944582AF1-123 E
Adder
97.5247058823529582.896
944592AF1-124 E
Adder
97.8776470588235383.196
935112AD1-144 E
Adder
0.88235294117647060.75
316349AD2-085 C
Adder
3.222.737
930122AB1-027 E
Adder
1.27058823529411781.08
316169AC1-164 GEN
Adder
37.0447058823529431.488
923832AB2-022 E
Adder
1.1517647058823530.979
963042AG1-153 E
Adder
7.2070588235294136.126
938772AE1-103 E
Adder
3.67882352941176463.127
916042Z1-036 E
Adder
26.0235294117647122.12
966882AG1-559 E
Adder
1.08235294117647070.92
939261AE1-157 C
Adder
12.43411764705882510.569
926740AC1-158 E2
50/50
39.12239.122
961611AG1-000B C
Adder
15.01294117647058712.761
3138116ELKO L286
Adder
1.28705882352941181.094
940541AE2-040 C
Adder
2.562.176
940482AE2-033 E
Adder
9.6941176470588258.24
940481AE2-033 C
Adder
14.37882352941176512.222
927041AC1-191 C
Adder
8.827.497
926004AC1-076_E
50/50
5.7785.778
940641AE2-051 C
50/50
15.61115.611
316084AB2-161 E
Adder
5.2058823529411774.425
926785AC1-164_E
Adder
16.64352941176470714.147
943471AF1-018 C
Adder
6.4717647058823545.501
3145946PLYMOUTH TP
Adder
0.287058823529411760.244
3150731STONECA
Adder
6.53294117647058855.553
932046AC2-012 E
Adder
12.32588235294117710.477
935161AD1-151 C
Adder
15.24705882352941312.96
938531AE1-072 C
Adder
16.40352941176470513.943
958161AF2-110 C
Adder
1.27411764705882361.083
3145393UNCAMP
Adder
5.5035294117647064.678
926486AC1-120 E
Adder
3.26823529411764732.778
316164AC1-076_C
50/50
1.0121.012
940642AE2-051 E
50/50
10.40710.407
919153AA1-139 E2
Adder
3.823.247
943462AF1-017 E
Adder
2.061.751
942341AE2-247 C
Adder
1.39529411764705881.186
926412AC1-112 E
Adder
1.03294117647058830.878
958162AF2-110 E
Adder
2.02588235294117651.722
924516AB2-100 E1
Adder
2.50705882352941162.131
934502AD1-074 E
Adder
15.18117647058823612.904
316303AF2-085
50/50
3.7313.731
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.2045.204
CBM West 2LTFEXP_CBM-W2->PJM
CBM
10.39910.399
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
1.3051.305
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
3.9713.971
CBM South 2LTFEXP_CBM-S2->PJM
CBM
66.04366.043
CPLELTFEXP_CPLE->PJM
CLTF
8.348.34
LAGNLTFEXP_LAGN->PJM
CLTF
4.1614.161
TVALTFEXP_TVA->PJM
CLTF
3.2553.255
O66PJM->LTFIMP_O-066
CMTX_NF
25.06225.062
G-007PJM->LTFIMP_G-007
CMTX_NF
3.9253.925
SIGELTFEXP_SIGE->PJM
CLTF
0.0740.074
NYPJM->LTFIMP_NY
CLTF
1.9221.922
LGEELTFEXP_LGEE->PJM
CLTF
0.310.31
WECLTFEXP_WEC->PJM
CLTF
0.1350.135

Details for AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 2083_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:DVP
Facility Description:
AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 2083_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:111.39 %
Rating:203.98 MVA
Rating Type:B
MVA to Mitigate:227.2
MW Contribution:19.22
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:DVP
Facility Description:
AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 2083_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:123.34 %
Rating:203.98 MVA
Rating Type:B
MVA to Mitigate:251.59
MW Contribution:23.27
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961951AG1-038 C
50/50
8.1488.148
961952AG1-038 E
50/50
11.25211.252
316077AC2-138 C
50/50
0.2790.279
936582AD2-073 E
Adder
0.56941176470588240.484
936592AD2-074 E
50/50
22.98722.987
957601AF2-054 C
Adder
-2.083529411764706-1.771
316404AE1-155 C
50/50
3.9123.912
958261AF2-120 C
50/50
11.53211.532
3150341NORNECKC1
50/50
0.8260.826
943741AF1-042 C
50/50
7.3727.372
962861AG1-135 C
50/50
12.18212.182
3141813NORNECK
50/50
1.0821.082
939246AE1-155 E
50/50
16.05816.058
957972AF2-091 E
Adder
1.70117647058823531.446
3150351NORNECKC2
50/50
0.7960.796
957971AF2-091 C
Adder
1.23176470588235291.047
964211AG1-282 C
Adder
0.81294117647058820.691
957191AF2-013 C
Adder
8.6294117647058827.335
963611AG1-210 C
50/50
0.8120.812
926472AC1-118 E
Adder
0.58705882352941170.499
963612AG1-210 E
50/50
1.2181.218
943742AF1-042 E
50/50
12.02812.028
962862AG1-135 E
50/50
8.1218.121
966662AG1-536 E
50/50
13.3313.33
944492AF1-114 E
Adder
5.00470588235294044.254
936591AD2-074 C
50/50
14.08914.089
966661AG1-536 C
50/50
9.929.92
958262AF2-120 E
50/50
7.6887.688
316078AC2-138 E
50/50
1.1371.137
944491AF1-114 C
Adder
3.62470588235294143.081
3150331BIRCHWDA
Adder
17.45647058823529514.838
964212AG1-282 E
Adder
0.54235294117647060.461
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.0010.001
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0060.006
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.0340.034
G-007ALTFEXP_G-007A->PJM
CMTX
0.0040.004
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0190.019
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0120.012
VTFLTFEXP_VFT->PJM
CMTX
0.0120.012
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0110.011
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0340.034
MDUPJM->LTFIMP_MDU
CLTF
0.0010.001
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0380.038
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023
CONTINGENCY 'DVP_P1-3: 6NORNECK-TX#6_SRT-A'
 OPEN BRANCH FROM BUS 314181 TO BUS 314182 CKT 2   /*3NORNECK     115.0 - 6NORNECK     230.0
END
CONTINGENCY 'DVP_P1-3: 6NORNECK-TX#4_SRT-A'
 OPEN BRANCH FROM BUS 314181 TO BUS 314182 CKT 1   /*3NORNECK     115.0 - 6NORNECK     230.0
END
CONTINGENCY 'DVP_P1-2: LN 2157_SRT-A'
 OPEN BRANCH FROM BUS 314134 TO BUS 314137 CKT 1   /*6CRANES      230.0 - 6FREDBRG     230.0
END
CONTINGENCY 'DVP_P1-2: LN 2090_SRT-A'
 OPEN BRANCH FROM BUS 313837 TO BUS 314138 CKT 1   /*6SUMMIT      230.0 - 6MINE RD     230.0
 OPEN BRANCH FROM BUS 313837 TO BUS 314197 CKT 1   /*6SUMMIT      230.0 - 6LDYSMITH CT 230.0
 OPEN BRANCH FROM BUS 314137 TO BUS 314138 CKT 1   /*6FREDBRG     230.0 - 6MINE RD     230.0
 OPEN BUS 313837                                   /*6SUMMIT      230.0
 OPEN BUS 314138                                   /*6MINE RD     230.0
END
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
CONTINGENCY 'DVP_P1-2: LN 9296_SRT-A'
 OPEN BRANCH FROM BUS 314137 TO BUS 314145 CKT 1   /*6FREDBRG     230.0 - 6AQUI_HARB_B 230.0
END
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S_SENS'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2598 BRANCH FROM BUS 314908 TO BUS 314903 CKT 1 /*8ELMONT      500.0 - 8CHCKAHM     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314918 TO BUS 314911 CKT 1 /*8NO ANNA     500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2598 BRANCH FROM BUS 314908 TO BUS 314903 CKT 1 /*8ELMONT      500.0 - 8CHCKAHM     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314918 TO BUS 314911 CKT 1 /*8NO ANNA     500.0 - 8LADYSMITH   500.0
END
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
CONTINGENCY 'DVP_P1-2: LN 2083_SRT-S'
 OPEN BRANCH FROM BUS 314132 TO BUS 314163 CKT 1                /*6BIRCHWD     230.0 - 6FINES       230.0
 OPEN BRANCH FROM BUS 314137 TO BUS 314163 CKT 1                /*6FREDBRG     230.0 - 6FINES       230.0
 OPEN BUS 314163                                                /*6FINES       230.0
 SET POSTCONTRATING 956 BRANCH FROM BUS 314137 TO BUS 314138 CKT 1 /*6FREDBRG     230.0 - 6MINE RD     230.0
 SET PRECONTRATING 876 BRANCH FROM BUS 314137 TO BUS 314138 CKT 1 /*6FREDBRG     230.0 - 6MINE RD     230.0
END
314181 to 314182 ckt 1
314181 to 314182 ckt 2
314145 to 314140 ckt 1
314132 to 314163 ckt 1
314214 to 314903 ckt 1
314286 to 314309 ckt 1
314218 to 314908 ckt 2
314163 to 314137 ckt 1
314137 to 314134 ckt 1
314309 to 314338 ckt 1
314196 to 314911 ckt 2
314236 to 314218 ckt 1
314903 to 314908 ckt 1
314908 to 314911 ckt 1
314911 to 313483 ckt 1
314934 to 314916 ckt 1
936590 to 314178 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1DVP
3GARNER-AG1-135 TP 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC123.78 %203.98B252.4961.98
GD1DVP
3GREYSPT-3HARMONY 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC157.98 %269.78B426.1961.98
GD1DVP
3HARMONY-6HARMONY 115.0/230.0 kV Ckt 1 transformer
DVP_P1-2: LN 65_SRT-SW-E
OPAC132.35 %224.38B296.9629.74
GD1DVP
3LANCAST-3OCRAN 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC204.17 %219.96B449.0861.98
GD1DVP
3OCRAN-3WHIT STONE 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC198.94 %219.96B437.5961.98
GD1DVP
3RAPP TR-3GREYSPT 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC162.34 %132.54B215.1730.99
GD1DVP
3RAPP TR-3GREYSPT 115.0 kV Ckt 2 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC162.34 %132.54B215.1730.99
GD1DVP
3WAN 89-3WHITEMARSH 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC120.03 %169.2B203.116.92
GD1DVP
3WEST PT-3LANEXA 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC110.04 %224.66B247.2115.26
GD1DVP
3WHIT STONE-3RAPPAHNCK 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC136.26 %315.84B430.3761.98
GD1DVP
3WHITEMARSH-3HAYES89 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC115.52 %169.2B195.4516.91
GD1DVP
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
Base Case
OPAC104.63 %548.02A573.412.37
GD1DVP
6FINES-6FREDBRG 230.0 kV Ckt 1 line
Base Case
OPAC104.58 %548.02A573.1112.37
GD1DVP
8CHANCE-8BRISTER 500.0 kV Ckt 1 line
DVP_P1-2: LN 594_SRT-S
OPAC103.49 %4070.2B4212.3111.07
GD1DVP
8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line
Base Case
OPAC104.09 %2442.12A2541.9913.4
GD1DVP
8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line
DVP_P1-2: LN 573_SRT-A
OPAC103.53 %4070.2B4213.911.33
GD1DVP
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
DVP_P1-2: LN 581_SRT-S
OPAC117.72 %3220.44B3790.958.7
GD1DVP
AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line
Base Case
OPAC101.31 %203.98A206.6522.31
GD1DVP
AE1-155 TAP-3GARNER 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC129.26 %203.98B263.6661.98
GD1DVP
AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line
Base Case
OPAC159.51 %203.98A325.3639.67
GD1DVP
AF1-114 TP-6DAHLGREN 230.0 kV Ckt 1 line
DVP_P1-2: LN 574_SRT-S
OPAC100.66 %571.52B575.2813.04
GD1DVP
AF2-013 TP-6ARNOLDS 230.0 kV Ckt 1 line
DVP_P1-2: LN 574_SRT-S
OPAC102.08 %559.3B570.9213.04
GD1DVP
AG1-135 TP-AD2-074 TP 115.0 kV Ckt 1 line
DVP_P1-2: LN 65_SRT-SW-E
OPAC153.07 %203.98B312.2261.98

Details for 3GARNER-AG1-135 TP 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3GARNER-AG1-135 TP 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:123.78 %
Rating:203.98 MVA
Rating Type:B
MVA to Mitigate:252.49
MW Contribution:61.98
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
24.7924.79
966661AG1-536 C
50/50
31.98731.987
966662AG1-536 E
50/50
42.98342.983
316404AE1-155 C
50/50
12.57112.571
958261AF2-120 C
50/50
37.18537.185
939246AE1-155 E
50/50
51.77951.779
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
O66PJM->LTFIMP_O-066
CMTX_NF
0.2670.267
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0420.042
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023

Details for 3GREYSPT-3HARMONY 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3GREYSPT-3HARMONY 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:157.98 %
Rating:269.78 MVA
Rating Type:B
MVA to Mitigate:426.19
MW Contribution:61.98
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
24.7924.79
966661AG1-536 C
50/50
31.98731.987
936591AD2-074 C
50/50
32.66732.667
943742AF1-042 E
50/50
27.88927.889
962862AG1-135 E
50/50
23.9923.99
966662AG1-536 E
50/50
42.98342.983
316404AE1-155 C
50/50
12.57112.571
958261AF2-120 C
50/50
37.18537.185
961952AG1-038 E
50/50
26.0926.09
961951AG1-038 C
50/50
18.89318.893
936592AD2-074 E
50/50
53.29953.299
943741AF1-042 C
50/50
17.09317.093
962861AG1-135 C
50/50
35.98635.986
939246AE1-155 E
50/50
51.77951.779
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
O66PJM->LTFIMP_O-066
CMTX_NF
0.2670.267
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0420.042
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023

Details for 3HARMONY-6HARMONY 115.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3HARMONY-6HARMONY 115.0/230.0 kV Ckt 1 transformer
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:132.35 %
Rating:224.38 MVA
Rating Type:B
MVA to Mitigate:296.96
MW Contribution:29.74
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
11.89511.895
966661AG1-536 C
50/50
15.34915.349
939612AE1-191 E
50/50
12.04512.045
957602AF2-054 E
50/50
3.8183.818
936591AD2-074 C
50/50
15.67515.675
3141843SHACKLE
50/50
0.880.88
939602AE1-190 E
50/50
3.0113.011
943742AF1-042 E
50/50
13.38213.382
962862AG1-135 E
50/50
11.51211.512
966662AG1-536 E
50/50
20.62520.625
939611AE1-191 C
50/50
2.892.89
316404AE1-155 C
50/50
6.0326.032
958261AF2-120 C
50/50
17.84317.843
934146AD1-041 E
50/50
7.5287.528
957601AF2-054 C
50/50
5.7275.727
939601AE1-190 C
50/50
0.7170.717
316157AD2-030 E
50/50
3.2143.214
316156AD2-030 C
50/50
1.0231.023
961952AG1-038 E
50/50
12.51912.519
961951AG1-038 C
50/50
9.0659.065
925865AC1-065 E
50/50
27.70627.706
936592AD2-074 E
50/50
25.57525.575
943741AF1-042 C
50/50
8.2028.202
962861AG1-135 C
50/50
17.26717.267
316280AD1-041 C
50/50
1.8311.831
316201AC1-065 C
50/50
2.72.7
957832AF2-077 E
50/50
1.9131.913
939246AE1-155 E
50/50
24.84624.846
957831AF2-077 C
50/50
0.4420.442
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0170.017
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0390.039
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.5360.536
CPLELTFEXP_CPLE->PJM
CLTF
0.0820.082
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0520.052
O66PJM->LTFIMP_O-066
CMTX_NF
0.6190.619
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0260.026
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0970.097
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0560.056
MDUPJM->LTFIMP_MDU
CLTF
0.0030.003
NYPJM->LTFIMP_NY
CLTF
0.0480.048
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.010.01

Details for 3LANCAST-3OCRAN 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3LANCAST-3OCRAN 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:204.17 %
Rating:219.96 MVA
Rating Type:B
MVA to Mitigate:449.08
MW Contribution:61.98
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
24.7924.79
966661AG1-536 C
50/50
31.98731.987
936591AD2-074 C
50/50
32.66732.667
943742AF1-042 E
50/50
27.88927.889
962862AG1-135 E
50/50
23.9923.99
966662AG1-536 E
50/50
42.98342.983
316404AE1-155 C
50/50
12.57112.571
958261AF2-120 C
50/50
37.18537.185
961952AG1-038 E
50/50
26.0926.09
961951AG1-038 C
50/50
18.89318.893
936592AD2-074 E
50/50
53.29953.299
943741AF1-042 C
50/50
17.09317.093
962861AG1-135 C
50/50
35.98635.986
939246AE1-155 E
50/50
51.77951.779
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
O66PJM->LTFIMP_O-066
CMTX_NF
0.2670.267
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0420.042
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023

Details for 3OCRAN-3WHIT STONE 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3OCRAN-3WHIT STONE 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:198.94 %
Rating:219.96 MVA
Rating Type:B
MVA to Mitigate:437.59
MW Contribution:61.98
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
24.7924.79
966661AG1-536 C
50/50
31.98731.987
936591AD2-074 C
50/50
32.66732.667
943742AF1-042 E
50/50
27.88927.889
962862AG1-135 E
50/50
23.9923.99
966662AG1-536 E
50/50
42.98342.983
316404AE1-155 C
50/50
12.57112.571
958261AF2-120 C
50/50
37.18537.185
961952AG1-038 E
50/50
26.0926.09
961951AG1-038 C
50/50
18.89318.893
936592AD2-074 E
50/50
53.29953.299
943741AF1-042 C
50/50
17.09317.093
962861AG1-135 C
50/50
35.98635.986
939246AE1-155 E
50/50
51.77951.779
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
O66PJM->LTFIMP_O-066
CMTX_NF
0.2670.267
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0420.042
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023

Details for 3RAPP TR-3GREYSPT 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3RAPP TR-3GREYSPT 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:162.34 %
Rating:132.54 MVA
Rating Type:B
MVA to Mitigate:215.17
MW Contribution:30.99
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
12.39512.395
966661AG1-536 C
50/50
15.99415.994
936591AD2-074 C
50/50
16.33416.334
943742AF1-042 E
50/50
13.94413.944
962862AG1-135 E
50/50
11.99511.995
966662AG1-536 E
50/50
21.49121.491
316404AE1-155 C
50/50
6.2866.286
958261AF2-120 C
50/50
18.59318.593
961952AG1-038 E
50/50
13.04513.045
961951AG1-038 C
50/50
9.4469.446
936592AD2-074 E
50/50
26.64926.649
943741AF1-042 C
50/50
8.5478.547
962861AG1-135 C
50/50
17.99317.993
939246AE1-155 E
50/50
25.8925.89
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0110.011
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.0150.015
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0340.034
O66PJM->LTFIMP_O-066
CMTX_NF
0.1330.133
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.020.02
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0210.021
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0070.007
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0510.051
MDUPJM->LTFIMP_MDU
CLTF
0.0020.002
NYPJM->LTFIMP_NY
CLTF
0.0110.011
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0420.042
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0110.011

Details for 3RAPP TR-3GREYSPT 115.0 kV Ckt 2 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3RAPP TR-3GREYSPT 115.0 kV Ckt 2 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:162.34 %
Rating:132.54 MVA
Rating Type:B
MVA to Mitigate:215.17
MW Contribution:30.99
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
12.39512.395
966661AG1-536 C
50/50
15.99415.994
936591AD2-074 C
50/50
16.33416.334
943742AF1-042 E
50/50
13.94413.944
962862AG1-135 E
50/50
11.99511.995
966662AG1-536 E
50/50
21.49121.491
316404AE1-155 C
50/50
6.2866.286
958261AF2-120 C
50/50
18.59318.593
961952AG1-038 E
50/50
13.04513.045
961951AG1-038 C
50/50
9.4469.446
936592AD2-074 E
50/50
26.64926.649
943741AF1-042 C
50/50
8.5478.547
962861AG1-135 C
50/50
17.99317.993
939246AE1-155 E
50/50
25.8925.89
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0110.011
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.0150.015
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0340.034
O66PJM->LTFIMP_O-066
CMTX_NF
0.1330.133
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.020.02
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0210.021
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0070.007
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0510.051
MDUPJM->LTFIMP_MDU
CLTF
0.0020.002
NYPJM->LTFIMP_NY
CLTF
0.0110.011
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0420.042
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0110.011

Details for 3WAN 89-3WHITEMARSH 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3WAN 89-3WHITEMARSH 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:120.03 %
Rating:169.2 MVA
Rating Type:B
MVA to Mitigate:203.1
MW Contribution:16.92
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
6.7676.767
966661AG1-536 C
50/50
8.7318.731
939612AE1-191 E
50/50
7.0567.056
957602AF2-054 E
50/50
2.1722.172
936591AD2-074 C
50/50
8.9178.917
3130536PAPERMILL
Adder
2.3364705882352941.986
3141843SHACKLE
50/50
0.5340.534
939602AE1-190 E
50/50
1.7641.764
943742AF1-042 E
50/50
7.6127.612
962862AG1-135 E
50/50
6.5486.548
966662AG1-536 E
50/50
11.73211.732
934392AD1-063 E
50/50
0.7880.788
939611AE1-191 C
50/50
1.6931.693
316404AE1-155 C
50/50
3.4313.431
958261AF2-120 C
50/50
10.1510.15
934146AD1-041 E
50/50
4.414.41
957601AF2-054 C
50/50
3.2583.258
939601AE1-190 C
50/50
0.420.42
316157AD2-030 E
50/50
1.8281.828
316156AD2-030 C
50/50
0.5820.582
961952AG1-038 E
50/50
7.1217.121
961951AG1-038 C
50/50
5.1575.157
925865AC1-065 E
50/50
16.81316.813
936592AD2-074 E
50/50
14.54814.548
943741AF1-042 C
50/50
4.6664.666
962861AG1-135 C
50/50
9.8229.822
316280AD1-041 C
50/50
1.0731.073
316201AC1-065 C
50/50
1.6391.639
940551AE2-041 C
50/50
5.2515.251
939246AE1-155 E
50/50
14.13314.133
316059AD1-063 C
50/50
0.1920.192
943471AF1-018 C
50/50
5.2515.251
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.0280.028
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0330.033
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1720.172
G-007ALTFEXP_G-007A->PJM
CMTX
0.0660.066
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.1050.105
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0660.066
VTFLTFEXP_VFT->PJM
CMTX
0.1770.177
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0580.058
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1860.186
MDUPJM->LTFIMP_MDU
CLTF
0.0070.007
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.2020.202
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.1170.117

Details for 3WEST PT-3LANEXA 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3WEST PT-3LANEXA 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:110.04 %
Rating:224.66 MVA
Rating Type:B
MVA to Mitigate:247.21
MW Contribution:15.26
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
6.1056.105
966661AG1-536 C
50/50
7.8787.878
939612AE1-191 E
50/50
12.85712.857
957602AF2-054 E
50/50
1.961.96
936591AD2-074 C
50/50
8.0458.045
3141843SHACKLE
50/50
1.5461.546
939602AE1-190 E
50/50
3.2143.214
943742AF1-042 E
50/50
6.8686.868
962862AG1-135 E
50/50
5.9085.908
966662AG1-536 E
50/50
10.58610.586
934392AD1-063 E
50/50
0.6210.621
939611AE1-191 C
50/50
3.0853.085
316404AE1-155 C
50/50
3.0963.096
958261AF2-120 C
50/50
9.1589.158
934146AD1-041 E
50/50
8.0358.035
957601AF2-054 C
50/50
2.9392.939
939601AE1-190 C
50/50
0.7650.765
316157AD2-030 E
50/50
1.6491.649
316156AD2-030 C
50/50
0.5250.525
961952AG1-038 E
50/50
6.4256.425
961951AG1-038 C
50/50
4.6534.653
925865AC1-065 E
50/50
48.65748.657
936592AD2-074 E
50/50
13.12613.126
943741AF1-042 C
50/50
4.214.21
962861AG1-135 C
50/50
8.8628.862
316280AD1-041 C
50/50
1.9551.955
316201AC1-065 C
50/50
4.7424.742
940551AE2-041 C
50/50
4.1424.142
957832AF2-077 E
50/50
0.9870.987
939246AE1-155 E
50/50
12.75212.752
316059AD1-063 C
50/50
0.1520.152
957831AF2-077 C
50/50
0.2280.228
943471AF1-018 C
50/50
4.1424.142
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0240.024
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0040.004
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0740.074
CPLELTFEXP_CPLE->PJM
CLTF
0.0090.009
O66PJM->LTFIMP_O-066
CMTX_NF
0.4580.458
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0410.041
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0720.072
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0040.004
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1010.101
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004
NYPJM->LTFIMP_NY
CLTF
0.0370.037
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0660.066

Details for 3WHIT STONE-3RAPPAHNCK 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3WHIT STONE-3RAPPAHNCK 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:136.26 %
Rating:315.84 MVA
Rating Type:B
MVA to Mitigate:430.37
MW Contribution:61.98
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
24.7924.79
966661AG1-536 C
50/50
31.98731.987
936591AD2-074 C
50/50
32.66732.667
943742AF1-042 E
50/50
27.88927.889
962862AG1-135 E
50/50
23.9923.99
966662AG1-536 E
50/50
42.98342.983
316404AE1-155 C
50/50
12.57112.571
958261AF2-120 C
50/50
37.18537.185
961952AG1-038 E
50/50
26.0926.09
961951AG1-038 C
50/50
18.89318.893
936592AD2-074 E
50/50
53.29953.299
943741AF1-042 C
50/50
17.09317.093
962861AG1-135 C
50/50
35.98635.986
939246AE1-155 E
50/50
51.77951.779
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
O66PJM->LTFIMP_O-066
CMTX_NF
0.2670.267
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0420.042
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023

Details for 3WHITEMARSH-3HAYES89 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
3WHITEMARSH-3HAYES89 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:115.52 %
Rating:169.2 MVA
Rating Type:B
MVA to Mitigate:195.45
MW Contribution:16.91
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
6.7656.765
966661AG1-536 C
50/50
8.7298.729
939612AE1-191 E
50/50
7.0547.054
957602AF2-054 E
50/50
2.1712.171
936591AD2-074 C
50/50
8.9148.914
3130536PAPERMILL
Adder
2.33411764705882341.984
3141843SHACKLE
50/50
0.5340.534
939602AE1-190 E
50/50
1.7631.763
943742AF1-042 E
50/50
7.6117.611
962862AG1-135 E
50/50
6.5476.547
966662AG1-536 E
50/50
11.7311.73
934392AD1-063 E
50/50
0.7870.787
939611AE1-191 C
50/50
1.6931.693
316404AE1-155 C
50/50
3.4313.431
958261AF2-120 C
50/50
10.14710.147
934146AD1-041 E
50/50
4.4094.409
957601AF2-054 C
50/50
3.2573.257
939601AE1-190 C
50/50
0.420.42
316157AD2-030 E
50/50
1.8281.828
316156AD2-030 C
50/50
0.5820.582
961952AG1-038 E
50/50
7.127.12
961951AG1-038 C
50/50
5.1565.156
925865AC1-065 E
50/50
16.80816.808
936592AD2-074 E
50/50
14.54514.545
943741AF1-042 C
50/50
4.6654.665
962861AG1-135 C
50/50
9.829.82
316280AD1-041 C
50/50
1.0721.072
316201AC1-065 C
50/50
1.6381.638
940551AE2-041 C
50/50
5.2495.249
957832AF2-077 E
50/50
5.0895.089
939246AE1-155 E
50/50
14.1314.13
316059AD1-063 C
50/50
0.1920.192
957831AF2-077 C
50/50
1.1751.175
943471AF1-018 C
50/50
5.2495.249
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.0190.019
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0370.037
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1770.177
G-007ALTFEXP_G-007A->PJM
CMTX
0.0510.051
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.1160.116
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0730.073
VTFLTFEXP_VFT->PJM
CMTX
0.1360.136
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.060.06
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.2020.202
MDUPJM->LTFIMP_MDU
CLTF
0.0070.007
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.2150.215
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.1210.121

Details for 6BIRCHWD-6FINES 230.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6BIRCHWD-6FINES 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:104.63 %
Rating:548.02 MVA
Rating Type:A
MVA to Mitigate:573.4
MW Contribution:12.37
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
4.9474.947
966661AG1-536 C
50/50
6.3836.383
316078AC2-138 E
50/50
1.3131.313
3150331BIRCHWDA
50/50
158.261158.261
944491AF1-114 C
50/50
20.95820.958
316337AD2-073 C
50/50
0.6340.634
939612AE1-191 E
50/50
3.5063.506
957602AF2-054 E
50/50
0.9110.911
936591AD2-074 C
50/50
5.8665.866
3130536PAPERMILL
Adder
3.80705882352941233.236
939602AE1-190 E
50/50
0.8770.877
943742AF1-042 E
50/50
5.0085.008
962862AG1-135 E
50/50
4.6754.675
966662AG1-536 E
50/50
8.5778.577
944492AF1-114 E
50/50
28.94228.942
934392AD1-063 E
50/50
0.640.64
939611AE1-191 C
50/50
0.8410.841
316404AE1-155 C
50/50
2.5082.508
958261AF2-120 C
50/50
7.427.42
934146AD1-041 E
50/50
2.1912.191
957601AF2-054 C
50/50
1.3661.366
316077AC2-138 C
50/50
0.320.32
957191AF2-013 C
50/50
65.34365.343
964211AG1-282 C
50/50
2.612.61
923842AB2-024 E
Adder
1.01882352941176470.866
939601AE1-190 C
50/50
0.2090.209
316157AD2-030 E
50/50
0.7670.767
3150351NORNECKC2
50/50
0.9160.916
964212AG1-282 E
50/50
1.741.74
316156AD2-030 C
50/50
0.2440.244
961952AG1-038 E
50/50
4.6854.685
961951AG1-038 C
50/50
3.3923.392
3141316ARNOLDS
50/50
1.0071.007
316223AC1-118 C
50/50
0.7620.762
936582AD2-073 E
50/50
1.9291.929
925865AC1-065 E
50/50
9.8759.875
957971AF2-091 C
50/50
7.1267.126
936592AD2-074 E
50/50
9.579.57
943741AF1-042 C
50/50
3.0693.069
962861AG1-135 C
50/50
7.0127.012
3141813NORNECK
50/50
1.2491.249
316280AD1-041 C
50/50
0.5330.533
3150341NORNECKC1
50/50
0.950.95
963612AG1-210 E
50/50
1.4061.406
316201AC1-065 C
50/50
0.9620.962
940551AE2-041 C
50/50
4.2664.266
957832AF2-077 E
Adder
0.64705882352941180.55
939246AE1-155 E
50/50
10.33210.332
957972AF2-091 E
50/50
9.849.84
963611AG1-210 C
50/50
0.9380.938
316059AD1-063 C
50/50
0.1560.156
926472AC1-118 E
50/50
2.4112.411
943471AF1-018 C
50/50
4.2664.266
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.8864.886
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.213.21
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.6870.687
CBM South 2LTFEXP_CBM-S2->PJM
CBM
12.2412.24
CPLELTFEXP_CPLE->PJM
CLTF
1.4411.441
MECLTFEXP_MEC->PJM
CLTF
0.5910.591
LAGNLTFEXP_LAGN->PJM
CLTF
1.0671.067
TVALTFEXP_TVA->PJM
CLTF
0.850.85
O66PJM->LTFIMP_O-066
CMTX_NF
4.744.74
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7450.745
SIGELTFEXP_SIGE->PJM
CLTF
0.0380.038
NYPJM->LTFIMP_NY
CLTF
0.3410.341
LGEELTFEXP_LGEE->PJM
CLTF
0.1980.198
WECLTFEXP_WEC->PJM
CLTF
0.1010.101

Details for 6FINES-6FREDBRG 230.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6FINES-6FREDBRG 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:104.58 %
Rating:548.02 MVA
Rating Type:A
MVA to Mitigate:573.11
MW Contribution:12.37
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
4.9474.947
966661AG1-536 C
50/50
6.3836.383
316078AC2-138 E
50/50
1.3131.313
3150331BIRCHWDA
50/50
158.261158.261
944491AF1-114 C
50/50
20.95820.958
316337AD2-073 C
50/50
0.6340.634
939612AE1-191 E
50/50
3.5063.506
957602AF2-054 E
50/50
0.9110.911
936591AD2-074 C
50/50
5.8665.866
3130536PAPERMILL
Adder
3.80705882352941233.236
939602AE1-190 E
50/50
0.8770.877
943742AF1-042 E
50/50
5.0085.008
962862AG1-135 E
50/50
4.6754.675
966662AG1-536 E
50/50
8.5778.577
944492AF1-114 E
50/50
28.94228.942
934392AD1-063 E
50/50
0.640.64
939611AE1-191 C
50/50
0.8410.841
316404AE1-155 C
50/50
2.5082.508
958261AF2-120 C
50/50
7.427.42
934146AD1-041 E
50/50
2.1912.191
957601AF2-054 C
50/50
1.3661.366
316077AC2-138 C
50/50
0.320.32
957191AF2-013 C
50/50
65.34365.343
964211AG1-282 C
50/50
2.612.61
923842AB2-024 E
Adder
1.01882352941176470.866
939601AE1-190 C
50/50
0.2090.209
316157AD2-030 E
50/50
0.7670.767
3150351NORNECKC2
50/50
0.9160.916
964212AG1-282 E
50/50
1.741.74
316156AD2-030 C
50/50
0.2440.244
961952AG1-038 E
50/50
4.6854.685
961951AG1-038 C
50/50
3.3923.392
3141316ARNOLDS
50/50
1.0071.007
316223AC1-118 C
50/50
0.7620.762
936582AD2-073 E
50/50
1.9291.929
925865AC1-065 E
50/50
9.8759.875
957971AF2-091 C
50/50
7.1267.126
936592AD2-074 E
50/50
9.579.57
943741AF1-042 C
50/50
3.0693.069
962861AG1-135 C
50/50
7.0127.012
3141813NORNECK
50/50
1.2491.249
316280AD1-041 C
50/50
0.5330.533
3150341NORNECKC1
50/50
0.950.95
963612AG1-210 E
50/50
1.4061.406
316201AC1-065 C
50/50
0.9620.962
940551AE2-041 C
50/50
4.2664.266
957832AF2-077 E
Adder
0.64705882352941180.55
939246AE1-155 E
50/50
10.33210.332
957972AF2-091 E
50/50
9.849.84
963611AG1-210 C
50/50
0.9380.938
316059AD1-063 C
50/50
0.1560.156
926472AC1-118 E
50/50
2.4112.411
943471AF1-018 C
50/50
4.2664.266
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.8864.886
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.213.21
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.5910.591
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.6870.687
CBM South 2LTFEXP_CBM-S2->PJM
CBM
12.2412.24
LAGNLTFEXP_LAGN->PJM
CLTF
1.0671.067
CPLELTFEXP_CPLE->PJM
CLTF
1.4411.441
TVALTFEXP_TVA->PJM
CLTF
0.850.85
O66PJM->LTFIMP_O-066
CMTX_NF
4.744.74
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7450.745
SIGELTFEXP_SIGE->PJM
CLTF
0.0380.038
NYPJM->LTFIMP_NY
CLTF
0.3410.341
LGEELTFEXP_LGEE->PJM
CLTF
0.1980.198
WECLTFEXP_WEC->PJM
CLTF
0.1010.101

Details for 8CHANCE-8BRISTER 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 594_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8CHANCE-8BRISTER 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 594_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:103.49 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4212.31
MW Contribution:11.07
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
Adder
4.4294117647058833.765
966661AG1-536 C
Adder
5.7152941176470584.858
316078AC2-138 E
Adder
0.97411764705882350.828
316312AB1-027 C
50/50
0.5850.585
3150451FOUR RIVERC
50/50
4.314.31
940432AE2-027 E
Adder
9.4729411764705888.052
939411AE1-173 C
Adder
92.0364705882352978.231
934012AD1-025 E
Adder
10.9729411764705889.327
913392Y1-086 E
Adder
2.34117647058823541.99
939612AE1-191 E
Adder
6.1141176470588245.197
957602AF2-054 E
Adder
1.51411764705882361.287
936591AD2-074 C
Adder
5.9258823529411765.037
3150461FOUR RIVERD
50/50
3.4763.476
3150651CHESTF6
Adder
20.5870588235294117.499
946262AF1-291 E
Adder
1.58588235294117651.348
934576AD1-082 E
Adder
4.7623529411764714.048
933292AC2-141 E
Adder
14.03647058823529311.931
940492AE2-034 E
Adder
3.1905882352941182.712
944602AF1-125 E
Adder
110.2776470588235393.736
957871AF2-081 C
Adder
10.6988235294117659.094
3145506HICKORY
Adder
2.34000000000000031.989
943612AF1-032 E
Adder
0.99058823529411770.842
3130536PAPERMILL
Adder
7.1317647058823546.062
939602AE1-190 E
Adder
1.5282352941176471.299
943742AF1-042 E
Adder
5.05882352941176454.3
962862AG1-135 E
Adder
4.3023529411764713.657
966662AG1-536 E
Adder
7.686.528
3150401LDYSMT4
50/50
5.4015.401
942002AE2-212 E
Adder
1.57294117647058831.337
940431AE2-027 C
Adder
14.21058823529411812.079
944581AF1-123 C
Adder
48.9258823529411841.587
941101AE2-104 C
Adder
3.58470588235294143.047
934392AD1-063 E
Adder
1.1517647058823530.979
964211AG1-282 C
Adder
2.11764705882352941.8
316076AC2-137 E
Adder
1.47529411764705891.254
966872AG1-558 E
Adder
1.341.139
966871AG1-558 C
Adder
2.662.261
3150831SPRUNCA
Adder
10.0964705882352958.582
3150841SPRUNCB
Adder
10.0964705882352958.582
3150391LDYSMT3
50/50
5.3915.391
316045AC1-158 C2
50/50
7.3677.367
316044AC1-158 C1
50/50
7.3677.367
923852AB2-025 E
Adder
1.16941176470588240.994
941032AE2-094 E
Adder
17.12117647058823514.553
941031AE2-094 C
Adder
38.2270588235294232.493
939412AE1-173 E
Adder
61.3576470588235452.154
916192Z1-068 E
Adder
2.0235294117647061.72
926662AC1-147 E
Adder
1.42941176470588241.215
957492AF2-043 E
Adder
1.52352941176470581.295
923842AB2-024 E
Adder
1.92941176470588241.64
316157AD2-030 E
Adder
1.27411764705882361.083
964212AG1-282 E
Adder
1.4117647058823531.2
3150601CHESTF5
Adder
70.2058823529411759.675
3150431FOUR RIVERA
50/50
3.5273.527
966881AG1-559 C
50/50
2.7662.766
925332AB2-190 E
Adder
8.8811764705882377.549
963041AG1-153 C
Adder
5.3364705882352944.536
944011AF1-069 C
Adder
12.49058823529411910.617
927226AC1-216 E
Adder
8.4752941176470587.204
3145413WATKINS
Adder
0.71529411764705890.608
936666AD2-085 E
Adder
6.03294117647058855.128
962962AG1-145 E
Adder
1.5835294117647061.346
938771AE1-103 C
Adder
3.06470588235294142.605
944591AF1-124 C
Adder
49.141.735
944601AF1-125 C
Adder
48.17294117647059440.947
941591AE2-156 C
Adder
19.3216.422
961952AG1-038 E
Adder
4.7329411764705884.023
961951AG1-038 C
Adder
3.42705882352941152.913
939262AE1-157 E
50/50
8.7638.763
944012AF1-069 E
Adder
4.8517647058823534.124
925865AC1-065 E
Adder
17.8870588235294115.204
936592AD2-074 E
Adder
9.6694117647058818.219
944631AF1-128 C
Adder
43.9294117647058937.34
315052AA1-145 CT2
50/50
5.6165.616
3150471FOUR RIVERE
50/50
3.4763.476
938552AE1-074 E
Adder
1.35529411764705881.152
3150411LDYSMT5
50/50
5.4185.418
316160AE1-175 E
Adder
1.30705882352941181.111
933291AC2-141 C
Adder
32.8811764705882427.949
926755AC1-161 E
Adder
14.03647058823529311.931
957872AF2-081 E
Adder
4.5847058823529413.897
925522AC1-027 E
Adder
1.31058823529411781.114
941102AE2-104 E
Adder
5.6988235294117654.844
3145256KINGFORK
Adder
1.09411764705882360.93
3150921YORKTN3
Adder
130.66235294117647111.063
958261AF2-120 C
Adder
6.6447058823529415.648
3143316POE
Adder
1.4635294117647061.244
939191AE1-149 C
Adder
11.6529411764705889.905
901082W1-029 E
Adder
33.8176470588235328.745
934146AD1-041 E
Adder
3.8211764705882363.248
957601AF2-054 C
Adder
2.2717647058823531.931
927042AC1-191 E
Adder
5.3188235294117654.521
316233AE1-074 C
Adder
2.69176470588235262.288
3150381LDYSMT2
50/50
5.2525.252
926739AC1-158 E1
50/50
19.2719.27
935162AD1-151 E
Adder
11.82117647058823610.048
943461AF1-017 C
Adder
1.44941176470588241.232
316311AC2-079 C
Adder
6.1564705882352945.233
932596AC2-079 E
Adder
10.0458823529411768.539
920692AA2-178 E
Adder
4.2541176470588233.616
917122Z2-027 E
Adder
1.4282352941176471.214
3146326AYDLETT TAP
Adder
1.44941176470588241.232
938532AE1-072 E
Adder
9.7976470588235298.328
940551AE2-041 C
Adder
7.67764705882352956.526
957832AF2-077 E
Adder
1.54588235294117651.314
943741AF1-042 C
Adder
3.10117647058823562.636
962861AG1-135 C
Adder
6.4529411764705885.485
3141813NORNECK
Adder
0.92588235294117650.787
3152251N ANNA1
50/50
40.24640.246
942001AE2-212 C
Adder
2.35882352941176482.005
939192AE1-149 E
Adder
7.7682352941176476.603
934501AD1-074 C
Adder
34.51411764705882529.337
937226AE2-253 E
Adder
6.265.321
934065AD1-033 E
Adder
5.3894117647058834.581
939312AE1-162 E
Adder
1.5552941176470591.322
939246AE1-155 E
Adder
9.2517647058823537.864
316004AC1-112 C
50/50
0.3640.364
3142296MT RD221
50/50
0.1350.135
944641AF1-129 C
Adder
113.0705882352941296.11
316240AF1-291 C
Adder
2.37882352941176432.022
924814AB2-134 E
Adder
13.88352941176470711.801
920042AA2-088 E OP
Adder
10.782352941176479.165
942342AE2-247 E
Adder
2.2129411764705881.881
919152AA1-139 E1
Adder
4.3752941176470593.719
316169AC1-164 GEN
Adder
44.39529411764705537.736
930122AB1-027 E
50/50
1.5391.539
966882AG1-559 E
50/50
1.3931.393
939261AE1-157 C
50/50
16.15516.155
963042AG1-153 E
Adder
8.0047058823529426.804
316349AD2-085 C
Adder
3.6976470588235293.143
938772AE1-103 E
Adder
4.2317647058823533.597
916042Z1-036 E
Adder
29.97176470588235425.476
944592AF1-124 E
Adder
112.4411764705882595.575
944582AF1-123 E
Adder
112.0352941176470795.23
923832AB2-022 E
Adder
1.32117647058823541.123
935112AD1-144 E
Adder
1.0152941176470590.863
963611AG1-210 C
Adder
0.69529411764705880.591
3138116ELKO L286
Adder
1.53882352941176471.308
927041AC1-191 C
Adder
10.6788235294117659.077
3150371LDYSMT1
50/50
5.1855.185
926740AC1-158 E2
50/50
19.2719.27
940541AE2-040 C
Adder
2.89058823529411772.457
940481AE2-033 C
Adder
16.25647058823529513.818
940482AE2-033 E
Adder
10.969.316
961611AG1-000B C
Adder
17.4070588235294114.796
926785AC1-164_E
Adder
19.94588235294117616.954
926004AC1-076_E
Adder
4.277647058823533.636
316084AB2-161 E
Adder
5.9764705882352945.08
940641AE2-051 C
Adder
17.23529411764705814.65
3145946PLYMOUTH TP
Adder
0.33176470588235290.282
943471AF1-018 C
Adder
7.67764705882352956.526
3150701DARBY 4
50/50
2.8532.853
3142366NRTHEST
50/50
0.2060.206
315051AA1-145 CT1
50/50
5.6195.619
3150481FOUR RIVERF
50/50
4.2454.245
3150731STONECA
Adder
7.6200000000000016.477
935161AD1-151 C
Adder
17.7317647058823515.072
3145393UNCAMP
Adder
6.3329411764705885.383
938531AE1-072 C
Adder
18.79411764705882215.975
932046AC2-012 E
Adder
14.1412.019
958161AF2-110 C
Adder
1.46235294117647091.243
963612AG1-210 E
Adder
1.04352941176470580.887
926412AC1-112 E
50/50
1.2521.252
3150441FOUR RIVERB
50/50
3.5273.527
3152261N ANNA2
50/50
40.26240.262
940642AE2-051 E
Adder
11.4905882352941179.767
934502AD1-074 E
Adder
8.9670588235294127.622
943462AF1-017 E
Adder
2.36588235294117682.011
942341AE2-247 C
Adder
1.60235294117647081.362
919153AA1-139 E2
Adder
4.3752941176470593.719
958162AF2-110 E
Adder
2.3270588235294121.978
CBM West 1LTFEXP_CBM-W1->PJM
CBM
30.06830.068
CBM West 2LTFEXP_CBM-W2->PJM
CBM
22.37922.379
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
5.0355.035
CBM South 2LTFEXP_CBM-S2->PJM
CBM
90.48890.488
CPLELTFEXP_CPLE->PJM
CLTF
10.55810.558
MECLTFEXP_MEC->PJM
CLTF
3.9143.914
LAGNLTFEXP_LAGN->PJM
CLTF
7.6467.646
TVALTFEXP_TVA->PJM
CLTF
6.1246.124
O66PJM->LTFIMP_O-066
CMTX_NF
36.64136.641
G-007PJM->LTFIMP_G-007
CMTX_NF
5.7495.749
SIGELTFEXP_SIGE->PJM
CLTF
0.2490.249
NYPJM->LTFIMP_NY
CLTF
2.722.72
LGEELTFEXP_LGEE->PJM
CLTF
1.3021.302
WECLTFEXP_WEC->PJM
CLTF
0.640.64

Details for 8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:104.09 %
Rating:2442.12 MVA
Rating Type:A
MVA to Mitigate:2541.99
MW Contribution:13.4
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
Adder
5.3588235294117644.555
966661AG1-536 C
Adder
6.91529411764705955.878
316078AC2-138 E
Adder
1.1482352941176470.976
940432AE2-027 E
Adder
7.2905882352941186.197
919710AA2-057 E
Adder
3.71882352941176463.161
3137643SOCKMAN
Adder
0.6764705882352940.575
939411AE1-173 C
Adder
101.4858823529411986.263
934012AD1-025 E
Adder
11.69.86
913392Y1-086 E
Adder
3.0235294117647062.57
3150991CHESPKB
50/50
1.0231.023
939612AE1-191 E
Adder
7.76.545
957602AF2-054 E
Adder
1.93294117647058841.643
936591AD2-074 C
Adder
7.2670588235294116.177
316274AC1-208 C
Adder
8.6647058823529427.365
934576AD1-082 E
Adder
4.80941176470588254.088
918492AA1-063AE OP
Adder
4.17764705882352953.551
917332KELFORD E
Adder
1.74000000000000021.479
925122AB2-169 E
Adder
6.3976470588235295.438
943172AE2-346 E
Adder
0.66705882352941170.567
934522AD1-076 E
Adder
7.48117647058823556.359
933292AC2-141 E
50/50
20.21420.214
940492AE2-034 E
Adder
3.8317647058823533.257
944602AF1-125 E
50/50
147.882147.882
957871AF2-081 C
50/50
14.02714.027
3145506HICKORY
50/50
3.0893.089
943612AF1-032 E
Adder
1.2764705882352941.085
3130536PAPERMILL
50/50
9.1469.146
939602AE1-190 E
Adder
1.9247058823529411.636
943742AF1-042 E
Adder
6.20470588235294155.274
962862AG1-135 E
Adder
5.2211764705882354.438
966662AG1-536 E
Adder
9.2917647058823527.898
940431AE2-027 C
Adder
10.9364705882352939.296
316088AB2-174 E
Adder
6.03294117647058855.128
923994AB2-040_E
Adder
5.7423529411764714.881
316141AB2-099 E
Adder
0.27764705882352940.236
316294AC1-161 C
50/50
7.7117.711
944581AF1-123 C
50/50
65.6165.61
316185AD1-033 C
50/50
1.7411.741
916191Z1-068 C
50/50
0.0620.062
941101AE2-104 C
Adder
4.4482352941176473.781
934392AD1-063 E
50/50
1.4751.475
958261AF2-120 C
Adder
8.0388235294117656.833
3143316POE
Adder
1.19294117647058821.014
939191AE1-149 C
Adder
10.6576470588235289.059
926206AC1-098 E
Adder
3.5952941176470593.056
316382AG1-145 C
50/50
0.5420.542
901082W1-029 E
Adder
43.0176470588235336.565
3150981CHESPKA
50/50
0.6170.617
934146AD1-041 E
Adder
4.8129411764705894.091
957601AF2-054 C
Adder
2.92.465
964211AG1-282 C
Adder
2.5270588235294122.148
316076AC2-137 E
Adder
1.53647058823529431.306
923852AB2-025 E
Adder
1.040.884
941032AE2-094 E
Adder
15.80941176470588313.438
941031AE2-094 C
Adder
35.2988235294117730.004
934321AD1-056 C
Adder
2.15411764705882371.831
927022AC1-189 E
Adder
4.1023529411764713.487
939412AE1-173 E
Adder
67.656470588235357.508
961942AG1-037 E
Adder
0.370588235294117660.315
961941AG1-037 C
Adder
0.55529411764705880.472
916192Z1-068 E
50/50
2.672.67
3151081ELIZAR1
50/50
4.5444.544
926662AC1-147 E
50/50
1.8821.882
957492AF2-043 E
Adder
1.9635294117647061.669
923842AB2-024 E
50/50
2.4762.476
316157AD2-030 E
Adder
1.6270588235294121.383
964212AG1-282 E
Adder
1.6847058823529411.432
3150601CHESTF5
Adder
66.756.695
925332AB2-190 E
Adder
8.8411764705882367.515
963041AG1-153 C
Adder
4.884.148
960081AF2-299 C
Adder
1.69647058823529421.442
944011AF1-069 C
Adder
11.532941176470599.803
926072AC1-086 E
Adder
9.1682352941176477.793
927226AC1-216 E
Adder
8.9599999999999997.616
3145413WATKINS
Adder
0.82235294117647050.699
936666AD2-085 E
Adder
6.9317647058823545.892
962962AG1-145 E
50/50
2.2212.221
938771AE1-103 C
Adder
3.62470588235294143.081
944591AF1-124 C
50/50
65.84465.844
944601AF1-125 C
50/50
64.664.6
3151101ELIZAR3
50/50
4.6014.601
941591AE2-156 C
50/50
25.46125.461
961952AG1-038 E
Adder
5.8035294117647064.933
961951AG1-038 C
Adder
4.20352941176470553.573
936582AD2-073 E
Adder
1.23176470588235291.047
946282AF1-292 E
Adder
0.93647058823529420.796
944012AF1-069 E
Adder
4.47999999999999953.808
917512Z2-088 E OP1
Adder
4.702352941176473.997
316316AC1-027 C
50/50
0.4470.447
3144216WINCHST
50/50
0.20.2
925865AC1-065 E
Adder
22.29058823529411618.947
316169AC1-164 GEN
50/50
57.50657.506
963042AG1-153 E
Adder
7.3188235294117656.221
946281AF1-292 C
Adder
1.40470588235294121.194
960082AF2-299 E
Adder
1.13058823529411770.961
926071AC1-086 C
Adder
20.14470588235294517.123
927021AC1-189 C
Adder
8.235294117647067
316349AD2-085 C
Adder
4.2482352941176483.611
938772AE1-103 E
Adder
5.00588235294117644.255
916042Z1-036 E
Adder
37.13529411764706431.565
944592AF1-124 E
50/50
150.785150.785
944582AF1-123 E
50/50
150.24150.24
923832AB2-022 E
Adder
1.7070588235294121.451
3151091ELIZAR2
50/50
4.4644.464
935112AD1-144 E
50/50
1.3041.304
316314AB2-024 C
50/50
0.4030.403
936592AD2-074 E
Adder
11.85764705882353110.079
944631AF1-128 C
Adder
41.73529411764706535.475
926214AC1-099 E
Adder
1.18705882352941171.009
932632AC2-084 E
Adder
3.17764705882352952.701
316160AE1-175 E
50/50
1.8321.832
933291AC2-141 C
50/50
47.35447.354
926755AC1-161 E
50/50
20.21420.214
957872AF2-081 E
50/50
6.0126.012
316018AA1-139 ULT2
50/50
1.5131.513
925522AC1-027 E
50/50
1.7291.729
941102AE2-104 E
Adder
7.0717647058823536.011
3145256KINGFORK
50/50
1.4051.405
3150921YORKTN3
50/50
185.501185.501
943741AF1-042 C
Adder
3.8023529411764713.232
962861AG1-135 C
Adder
7.8329411764705896.658
3141813NORNECK
Adder
1.09294117647058830.929
939192AE1-149 E
Adder
7.1047058823529416.039
924517AB2-100 E2
Adder
2.6788235294117652.277
934501AD1-074 C
Adder
40.41176470588235534.35
937226AE2-253 E
50/50
8.238.23
934065AD1-033 E
50/50
7.137.13
939312AE1-162 E
Adder
1.9235294117647061.635
963612AG1-210 E
Adder
1.23058823529411781.046
924516AB2-100 E1
Adder
2.6788235294117652.277
966621AG1-532 C
Adder
1.27294117647058851.082
940642AE2-051 E
Adder
11.79999999999999910.03
918532AA1-067 E
Adder
0.72588235294117650.617
918512AA1-065 E OP
Adder
6.2364705882352955.301
934502AD1-074 E
Adder
20.57176470588235517.486
934512AD1-075 E
Adder
5.1435294117647064.372
943462AF1-017 E
Adder
2.71882352941176462.311
942341AE2-247 C
Adder
1.84117647058823521.565
316159AE1-175 C
50/50
0.6010.601
919153AA1-139 E2
50/50
5.7365.736
316388AE2-253 GEN
50/50
2.7582.758
966622AG1-532 E
Adder
0.84823529411764710.721
935162AD1-151 E
Adder
12.10588235294117610.29
943461AF1-017 C
Adder
1.66588235294117641.416
316311AC2-079 C
Adder
7.1458823529411766.074
932596AC2-079 E
Adder
11.6588235294117669.91
920692AA2-178 E
Adder
5.1082352941176474.342
3152331SURRY 2
50/50
43.89143.891
917122Z2-027 E
Adder
1.83411764705882341.559
3146326AYDLETT TAP
50/50
1.8931.893
938532AE1-072 E
50/50
12.8112.81
940551AE2-041 C
Adder
9.8305882352941178.356
957832AF2-077 E
50/50
2.0912.091
939246AE1-155 E
Adder
11.1941176470588259.515
3145723EMPORIA
Adder
0.39411764705882360.335
923573AB1-173 E OP
Adder
3.06235294117647072.603
919692AA2-053 E OP
Adder
4.1705882352941183.545
924814AB2-134 E
Adder
14.67647058823529312.475
920042AA2-088 E OP
Adder
11.93294117647058910.143
934521AD1-076 C
Adder
14.67647058823529312.475
934511AD1-075 C
Adder
10.102352941176478.587
942342AE2-247 E
Adder
2.54235294117647072.161
919152AA1-139 E1
50/50
5.7365.736
316036AC1-147 C
50/50
0.5220.522
963611AG1-210 C
Adder
0.820.697
3138116ELKO L286
Adder
1.60117647058823541.361
940541AE2-040 C
Adder
2.5717647058823532.186
940481AE2-033 C
Adder
14.5623529411764712.378
940482AE2-033 E
Adder
9.817647058823538.345
923263AB1-132 E OP
Adder
5.86235294117647054.983
316375AC2-012 C
50/50
1.9131.913
961611AG1-000B C
Adder
20.0529411764705917.045
316072AD1-144 C
50/50
0.3890.389
316059AD1-063 C
50/50
0.360.36
957831AF2-077 C
50/50
0.4830.483
926472AC1-118 E
Adder
1.13411764705882350.964
926785AC1-164_E
50/50
25.83625.836
927146AC1-208 E
Adder
3.8470588235294123.27
316084AB2-161 E
Adder
6.0352941176470595.13
940641AE2-051 C
Adder
17.715.045
933982AD1-022 E
Adder
5.6317647058823534.787
3145946PLYMOUTH TP
Adder
0.38941176470588240.331
316017AA1-139 ULT1
50/50
1.5131.513
943471AF1-018 C
Adder
9.8305882352941178.356
3150731STONECA
Adder
6.8694117647058835.839
935161AD1-151 C
Adder
18.1615.436
900672V4-068 E
Adder
0.395294117647058850.336
933981AD1-022 C
Adder
10.3435294117647068.792
3145393UNCAMP
Adder
7.4105882352941186.299
938531AE1-072 C
50/50
24.57324.573
932046AC2-012 E
50/50
18.61318.613
958161AF2-110 C
Adder
1.81529411764705871.543
958162AF2-110 E
Adder
2.8870588235294122.454
CBM West 1LTFEXP_CBM-W1->PJM
CBM
13.05913.059
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.06213.062
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
4.274.27
CBM South 2LTFEXP_CBM-S2->PJM
CBM
70.8670.86
CPLELTFEXP_CPLE->PJM
CLTF
8.9638.963
MECLTFEXP_MEC->PJM
CLTF
1.9921.992
LAGNLTFEXP_LAGN->PJM
CLTF
4.854.85
TVALTFEXP_TVA->PJM
CLTF
3.7783.778
O66PJM->LTFIMP_O-066
CMTX_NF
17.37617.376
G-007PJM->LTFIMP_G-007
CMTX_NF
2.7242.724
SIGELTFEXP_SIGE->PJM
CLTF
0.1170.117
NYPJM->LTFIMP_NY
CLTF
1.3121.312
LGEELTFEXP_LGEE->PJM
CLTF
0.5530.553
WECLTFEXP_WEC->PJM
CLTF
0.2830.283

Details for 8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 573_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 573_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:103.53 %
Rating:4070.2 MVA
Rating Type:B
MVA to Mitigate:4213.9
MW Contribution:11.33
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
Adder
4.53176470588235253.852
966661AG1-536 C
Adder
5.8482352941176474.971
316078AC2-138 E
Adder
0.99647058823529410.847
316312AB1-027 C
50/50
0.5970.597
3150451FOUR RIVERC
50/50
4.414.41
940432AE2-027 E
Adder
9.6611764705882348.212
939411AE1-173 C
Adder
93.7423529411764679.681
934012AD1-025 E
Adder
11.1917647058823539.513
913392Y1-086 E
Adder
2.38588235294117632.028
939612AE1-191 E
Adder
6.2458823529411775.309
957602AF2-054 E
Adder
1.54705882352941181.315
936591AD2-074 C
Adder
6.0611764705882365.152
3150461FOUR RIVERD
50/50
3.5573.557
3150651CHESTF6
Adder
20.99647058823529717.847
946262AF1-291 E
Adder
1.61764705882352941.375
934576AD1-082 E
Adder
4.8541176470588244.126
934522AD1-076 E
Adder
6.5094117647058835.533
933292AC2-141 E
Adder
14.30941176470588312.163
940492AE2-034 E
Adder
3.25176470588235272.764
944602AF1-125 E
Adder
112.412941176470695.551
957871AF2-081 C
Adder
10.904705882352949.269
3145506HICKORY
Adder
2.38470588235294122.027
943612AF1-032 E
Adder
1.00941176470588250.858
3130536PAPERMILL
Adder
7.2870588235294126.194
939602AE1-190 E
Adder
1.56117647058823541.327
943742AF1-042 E
Adder
5.1741176470588234.398
962862AG1-135 E
Adder
4.40117647058823553.741
966662AG1-536 E
Adder
7.857647058823536.679
3150401LDYSMT4
50/50
5.5555.555
942002AE2-212 E
Adder
1.60352941176470591.363
940431AE2-027 C
Adder
14.49176470588235312.318
944581AF1-123 C
Adder
49.87411764705882442.393
941101AE2-104 C
Adder
3.65411764705882373.106
934392AD1-063 E
Adder
1.17647058823529421
958261AF2-120 C
Adder
6.7976470588235295.778
3143316POE
Adder
1.4917647058823531.268
939191AE1-149 C
Adder
11.8810.098
901082W1-029 E
Adder
34.4682352941176529.298
934146AD1-041 E
Adder
3.9035294117647063.318
964211AG1-282 C
Adder
2.16705882352941171.842
316076AC2-137 E
Adder
1.50588235294117641.28
966872AG1-558 E
Adder
1.36941176470588231.164
966871AG1-558 C
Adder
2.71882352941176462.311
3150831SPRUNCA
Adder
10.2905882352941188.747
3150841SPRUNCB
Adder
10.2905882352941188.747
3150391LDYSMT3
50/50
5.5445.544
923852AB2-025 E
Adder
1.19058823529411771.012
941032AE2-094 E
Adder
17.42588235294117614.812
941031AE2-094 C
Adder
38.9070588235294133.071
939412AE1-173 E
Adder
62.4952941176470653.121
916192Z1-068 E
Adder
2.0635294117647061.754
926662AC1-147 E
Adder
1.45764705882352951.239
957492AF2-043 E
Adder
1.55294117647058831.32
923842AB2-024 E
Adder
1.97176470588235291.676
316157AD2-030 E
Adder
1.30235294117647071.107
964212AG1-282 E
Adder
1.44470588235294131.228
3150601CHESTF5
Adder
71.6458823529411960.899
3150431FOUR RIVERA
50/50
3.613.61
966881AG1-559 C
50/50
2.8382.838
925332AB2-190 E
Adder
9.057647058823537.699
963041AG1-153 C
Adder
5.4305882352941184.616
944011AF1-069 C
Adder
12.71176470588235210.805
927226AC1-216 E
Adder
8.6447058823529417.348
3145413WATKINS
Adder
0.72823529411764710.619
936666AD2-085 E
Adder
6.1494117647058835.227
962962AG1-145 E
Adder
1.61647058823529431.374
938771AE1-103 C
Adder
3.12235294117647082.654
944591AF1-124 C
Adder
50.0517647058823542.544
944601AF1-125 C
Adder
49.1058823529411841.74
941591AE2-156 C
Adder
19.6952941176470616.741
961952AG1-038 E
Adder
4.8411764705882364.115
961951AG1-038 C
Adder
3.50588235294117642.98
939262AE1-157 E
50/50
8.9998.999
944012AF1-069 E
Adder
4.9388235294117654.198
925865AC1-065 E
Adder
18.27411764705882315.533
316169AC1-164 GEN
Adder
45.3376470588235338.537
930122AB1-027 E
50/50
1.5721.572
966882AG1-559 E
50/50
1.431.43
939261AE1-157 C
50/50
16.59116.591
936592AD2-074 E
Adder
9.8894117647058838.406
944631AF1-128 C
Adder
44.8294117647058838.105
315052AA1-145 CT2
50/50
5.7475.747
3150471FOUR RIVERE
50/50
3.5573.557
934782AD1-105 E
Adder
2.9682352941176472.523
938552AE1-074 E
Adder
1.38000000000000011.173
3150411LDYSMT5
50/50
5.5725.572
316160AE1-175 E
Adder
1.33411764705882341.134
933291AC2-141 C
Adder
33.5211764705882428.493
926755AC1-161 E
Adder
14.30941176470588312.163
957872AF2-081 E
Adder
4.6741176470588233.973
925522AC1-027 E
Adder
1.3364705882352941.136
941102AE2-104 E
Adder
5.80941176470588254.938
3145256KINGFORK
Adder
1.11529411764705880.948
3150921YORKTN3
Adder
133.3164705882353113.319
943741AF1-042 C
Adder
3.1717647058823532.696
962861AG1-135 C
Adder
6.6023529411764715.612
3141813NORNECK
Adder
0.94823529411764720.806
3152251N ANNA1
50/50
40.87840.878
942001AE2-212 C
Adder
2.40588235294117642.045
939192AE1-149 E
Adder
7.9200000000000016.732
924517AB2-100 E2
Adder
2.91411764705882352.477
934501AD1-074 C
Adder
35.1647058823529429.89
937226AE2-253 E
Adder
6.3811764705882365.424
934065AD1-033 E
Adder
5.49411764705882364.67
939312AE1-162 E
Adder
1.58588235294117651.348
957601AF2-054 C
Adder
2.321.972
927042AC1-191 E
Adder
5.4376470588235294.622
316233AE1-074 C
Adder
2.73882352941176472.328
3150381LDYSMT2
50/50
5.4025.402
935162AD1-151 E
Adder
12.0576470588235310.249
943461AF1-017 C
Adder
1.47764705882352951.256
316311AC2-079 C
Adder
6.2752941176470595.334
932596AC2-079 E
Adder
10.2388235294117648.703
920692AA2-178 E
Adder
4.3352941176470593.685
917122Z2-027 E
Adder
1.4552941176470591.237
3146326AYDLETT TAP
Adder
1.47764705882352951.256
938532AE1-072 E
Adder
9.9870588235294138.489
940551AE2-041 C
Adder
7.8435294117647066.667
957832AF2-077 E
Adder
1.57882352941176471.342
939246AE1-155 E
Adder
9.4658823529411768.046
316004AC1-112 C
50/50
0.3720.372
3142296MT RD221
50/50
0.1380.138
944641AF1-129 C
Adder
115.3152941176470698.018
316240AF1-291 C
Adder
2.42588235294117642.062
924814AB2-134 E
Adder
14.1612.036
920042AA2-088 E OP
Adder
10.9811764705882359.334
934521AD1-076 C
Adder
12.77058823529411810.855
934511AD1-075 C
Adder
8.7917647058823527.473
942342AE2-247 E
Adder
2.2552941176470591.917
919152AA1-139 E1
Adder
4.463.791
963042AG1-153 E
Adder
8.1447058823529416.923
316349AD2-085 C
Adder
3.7682352941176473.203
938772AE1-103 E
Adder
4.3117647058823533.665
916042Z1-036 E
Adder
30.54352941176470525.962
944592AF1-124 E
Adder
114.6297.427
944582AF1-123 E
Adder
114.2058823529411997.075
923832AB2-022 E
Adder
1.34705882352941191.145
935112AD1-144 E
Adder
1.0352941176470590.88
963611AG1-210 C
Adder
0.7117647058823530.605
3138116ELKO L286
Adder
1.57058823529411761.335
927041AC1-191 C
Adder
10.915294117647069.278
3150371LDYSMT1
50/50
5.3335.333
940541AE2-040 C
Adder
2.94352941176470572.502
940481AE2-033 C
Adder
16.55647058823529614.073
940482AE2-033 E
Adder
11.1611764705882369.487
961611AG1-000B C
Adder
17.75176470588235515.089
926785AC1-164_E
Adder
20.36941176470588417.314
316084AB2-161 E
Adder
6.0929411764705895.179
940641AE2-051 C
Adder
17.55058823529411814.918
3145946PLYMOUTH TP
Adder
0.33764705882352940.287
943471AF1-018 C
Adder
7.8435294117647066.667
3150701DARBY 4
50/50
2.9132.913
3142366NRTHEST
50/50
0.2110.211
315051AA1-145 CT1
50/50
5.755.75
3150481FOUR RIVERF
50/50
4.3444.344
3150731STONECA
Adder
7.7717647058823536.606
935161AD1-151 C
Adder
18.08588235294117715.373
3145393UNCAMP
Adder
6.4517647058823535.484
938531AE1-072 C
Adder
19.15764705882352816.284
932046AC2-012 E
Adder
14.41411764705882512.252
958161AF2-110 C
Adder
1.49058823529411751.267
963612AG1-210 E
Adder
1.06823529411764720.908
926412AC1-112 E
50/50
1.2791.279
3150441FOUR RIVERB
50/50
3.613.61
3152261N ANNA2
50/50
40.89340.893
924516AB2-100 E1
Adder
2.91411764705882352.477
940642AE2-051 E
Adder
11.7000000000000019.945
934502AD1-074 E
Adder
17.90117647058823615.216
934512AD1-075 E
Adder
4.4752941176470593.804
943462AF1-017 E
Adder
2.4117647058823532.05
942341AE2-247 C
Adder
1.63294117647058811.388
919153AA1-139 E2
Adder
4.463.791
958162AF2-110 E
Adder
2.3717647058823532.016
CBM West 1LTFEXP_CBM-W1->PJM
CBM
31.55931.559
CBM West 2LTFEXP_CBM-W2->PJM
CBM
23.04923.049
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
4.0634.063
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
5.1265.126
CBM South 2LTFEXP_CBM-S2->PJM
CBM
92.18992.189
CPLELTFEXP_CPLE->PJM
CLTF
10.74810.748
LAGNLTFEXP_LAGN->PJM
CLTF
7.8427.842
TVALTFEXP_TVA->PJM
CLTF
6.2796.279
O66PJM->LTFIMP_O-066
CMTX_NF
35.97435.974
G-007PJM->LTFIMP_G-007
CMTX_NF
5.6455.645
SIGELTFEXP_SIGE->PJM
CLTF
0.2590.259
NYPJM->LTFIMP_NY
CLTF
2.6672.667
LGEELTFEXP_LGEE->PJM
CLTF
1.3551.355
WECLTFEXP_WEC->PJM
CLTF
0.6690.669

Details for 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 581_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:117.72 %
Rating:3220.44 MVA
Rating Type:B
MVA to Mitigate:3790.95
MW Contribution:8.7
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
Adder
3.48000000000000042.958
966661AG1-536 C
Adder
4.4905882352941183.817
316312AB1-027 C
50/50
0.4890.489
3150451FOUR RIVERC
50/50
3.6073.607
940432AE2-027 E
Adder
7.7329411764705896.573
939411AE1-173 C
Adder
73.6611764705882562.612
934012AD1-025 E
Adder
8.987.633
913392Y1-086 E
Adder
1.90823529411764731.622
939612AE1-191 E
Adder
4.9541176470588244.211
957602AF2-054 E
Adder
1.2247058823529411.041
936591AD2-074 C
Adder
4.6894117647058823.986
3150461FOUR RIVERD
50/50
2.9092.909
3150651CHESTF6
Adder
16.84705882352941214.32
946262AF1-291 E
Adder
1.29647058823529431.102
934576AD1-082 E
Adder
3.8752941176470593.294
918492AA1-063AE OP
Adder
3.31294117647058832.816
943172AE2-346 E
Adder
0.49882352941176470.424
934522AD1-076 E
Adder
5.2352941176470594.45
933292AC2-141 E
Adder
11.4317647058823559.717
940492AE2-034 E
Adder
2.61058823529411742.219
944602AF1-125 E
Adder
89.7282352941176576.269
957871AF2-081 C
Adder
8.7129411764705887.406
3145506HICKORY
Adder
1.90470588235294121.619
943612AF1-032 E
Adder
0.80705882352941180.686
3130536PAPERMILL
Adder
5.8047058823529414.934
939602AE1-190 E
Adder
1.23882352941176471.053
943742AF1-042 E
Adder
4.0035294117647063.403
962862AG1-135 E
Adder
3.3858823529411772.878
966662AG1-536 E
Adder
6.0341176470588245.129
3150401LDYSMT4
50/50
4.4254.425
942002AE2-212 E
Adder
1.28117647058823541.089
940431AE2-027 C
Adder
11.5988235294117659.859
316088AB2-174 E
Adder
5.1988235294117644.419
923994AB2-040_E
Adder
4.9094117647058824.173
316141AB2-099 E
Adder
0.208235294117647050.177
944581AF1-123 C
Adder
39.80941176470588533.838
941101AE2-104 C
Adder
2.92000000000000042.482
934392AD1-063 E
Adder
0.93529411764705890.795
958261AF2-120 C
Adder
5.2200000000000014.437
3143316POE
Adder
1.18588235294117661.008
939191AE1-149 C
Adder
9.4788235294117668.057
901082W1-029 E
Adder
27.57882352941176423.442
934146AD1-041 E
Adder
3.09647058823529432.632
957601AF2-054 C
Adder
1.83764705882352961.562
964211AG1-282 C
Adder
1.65294117647058841.405
316076AC2-137 E
Adder
1.22235294117647041.039
966872AG1-558 E
Adder
1.10588235294117650.94
966871AG1-558 C
Adder
2.1964705882352941.867
3150831SPRUNCA
Adder
8.2188235294117656.986
3150841SPRUNCB
Adder
8.2188235294117656.986
3150391LDYSMT3
50/50
4.4174.417
923862AB2-026 E
Adder
0.97294117647058820.827
923852AB2-025 E
Adder
0.9435294117647060.802
941032AE2-094 E
Adder
13.61294117647058911.571
941031AE2-094 C
Adder
30.39411764705882425.835
939412AE1-173 E
Adder
49.10705882352941441.741
961942AG1-037 E
Adder
0.27764705882352940.236
961941AG1-037 C
Adder
0.41529411764705880.353
916192Z1-068 E
Adder
1.6482352941176471.401
926662AC1-147 E
Adder
1.1635294117647060.989
957492AF2-043 E
Adder
1.24117647058823531.055
923842AB2-024 E
Adder
1.57176470588235321.336
316157AD2-030 E
Adder
1.03058823529411760.876
964212AG1-282 E
Adder
1.10235294117647080.937
3150601CHESTF5
Adder
57.8376470588235349.162
3150431FOUR RIVERA
50/50
2.9522.952
966881AG1-559 C
50/50
2.2882.288
925332AB2-190 E
Adder
7.2729411764705896.182
963041AG1-153 C
Adder
4.2658823529411763.626
960081AF2-299 C
Adder
1.48823529411764691.265
944011AF1-069 C
Adder
9.9305882352941198.441
926072AC1-086 E
Adder
7.6611764705882356.512
927226AC1-216 E
Adder
6.9364705882352945.896
3145413WATKINS
Adder
0.58352941176470590.496
936666AD2-085 E
Adder
4.9129411764705884.176
962962AG1-145 E
Adder
1.3035294117647061.108
938771AE1-103 C
Adder
2.5011764705882352.126
944591AF1-124 C
Adder
39.9505882352941233.958
944601AF1-125 C
Adder
39.1964705882352933.317
941591AE2-156 C
Adder
15.7305882352941213.371
961952AG1-038 E
Adder
3.74588235294117673.184
961951AG1-038 C
Adder
2.7117647058823532.305
939262AE1-157 E
50/50
7.2257.225
946282AF1-292 E
Adder
0.82117647058823530.698
944012AF1-069 E
Adder
3.8576470588235293.279
925865AC1-065 E
Adder
14.5152941176470612.338
316169AC1-164 GEN
Adder
36.80588235294117531.285
930122AB1-027 E
50/50
1.2861.286
966882AG1-559 E
50/50
1.1531.153
939261AE1-157 C
50/50
13.3213.32
963042AG1-153 E
Adder
6.3988235294117655.439
946281AF1-292 C
Adder
1.23176470588235291.047
960082AF2-299 E
Adder
0.99176470588235290.843
926071AC1-086 C
Adder
16.83294117647058714.308
316349AD2-085 C
Adder
3.0105882352941182.559
938772AE1-103 E
Adder
3.45411764705882352.936
916042Z1-036 E
Adder
24.4823529411764720.81
944592AF1-124 E
Adder
91.4894117647058977.766
944582AF1-123 E
Adder
91.1600000000000177.486
923832AB2-022 E
Adder
1.07647058823529430.915
935112AD1-144 E
Adder
0.82823529411764710.704
936592AD2-074 E
Adder
7.6517647058823536.504
944631AF1-128 C
Adder
36.1894117647058830.761
315052AA1-145 CT2
50/50
4.74.7
3150471FOUR RIVERE
50/50
2.9092.909
938552AE1-074 E
Adder
1.08588235294117650.923
3150411LDYSMT5
50/50
4.4394.439
938562AE1-075 E
Adder
0.82941176470588230.705
316160AE1-175 E
Adder
1.0752941176470590.914
933291AC2-141 C
Adder
26.7822.763
926755AC1-161 E
Adder
11.4317647058823559.717
957872AF2-081 E
Adder
3.73411764705882383.174
925522AC1-027 E
Adder
1.06705882352941180.907
941102AE2-104 E
Adder
4.6435294117647063.947
3145256KINGFORK
Adder
0.8917647058823530.758
3150921YORKTN3
Adder
107.0694117647058991.009
943741AF1-042 C
Adder
2.45411764705882352.086
962861AG1-135 C
Adder
5.0788235294117654.317
958502AF2-144 E
Adder
0.95647058823529410.813
942001AE2-212 C
Adder
1.92117647058823531.633
939192AE1-149 E
Adder
6.3188235294117655.371
924517AB2-100 E2
Adder
2.32823529411764741.979
934501AD1-074 C
Adder
28.28352941176470724.041
937226AE2-253 E
Adder
5.0976470588235294.333
934065AD1-033 E
Adder
4.38823529411764753.73
939312AE1-162 E
Adder
1.26941176470588221.079
926412AC1-112 E
50/50
1.0461.046
3150441FOUR RIVERB
50/50
2.9522.952
924516AB2-100 E1
Adder
2.32823529411764741.979
966621AG1-532 C
Adder
1.1164705882352940.949
940642AE2-051 E
Adder
9.1435294117647077.772
918512AA1-065 E OP
Adder
4.5741176470588243.888
934502AD1-074 E
Adder
14.3976470588235312.238
934512AD1-075 E
Adder
3.63.06
943462AF1-017 E
Adder
1.92588235294117661.637
942341AE2-247 C
Adder
1.30470588235294121.109
919153AA1-139 E2
Adder
3.5635294117647063.029
958162AF2-110 E
Adder
1.89529411764705881.611
3150691DARBY 3
50/50
2.3622.362
927042AC1-191 E
Adder
4.3917647058823533.733
316233AE1-074 C
Adder
2.1552941176470591.832
3150381LDYSMT2
50/50
4.3044.304
966622AG1-532 E
Adder
0.74470588235294120.633
935162AD1-151 E
Adder
9.6788235294117658.227
943461AF1-017 C
Adder
1.18117647058823531.004
316311AC2-079 C
Adder
5.0141176470588234.262
932596AC2-079 E
Adder
8.186.953
920692AA2-178 E
Adder
3.48117647058823552.959
917122Z2-027 E
Adder
1.16470588235294130.99
3146326AYDLETT TAP
Adder
1.18117647058823531.004
938532AE1-072 E
Adder
7.986.783
940551AE2-041 C
Adder
6.2364705882352955.301
957832AF2-077 E
Adder
1.2588235294117651.07
939246AE1-155 E
Adder
7.26941176470588256.179
316004AC1-112 C
50/50
0.3050.305
3142296MT RD221
50/50
0.1140.114
944641AF1-129 C
Adder
92.5282352941176578.649
316240AF1-291 C
Adder
1.94470588235294131.653
3145723EMPORIA
Adder
0.343529411764705860.292
923573AB1-173 E OP
Adder
2.61882352941176462.226
924814AB2-134 E
Adder
11.362352941176479.658
920042AA2-088 E OP
Adder
8.822352941176477.499
934521AD1-076 C
Adder
10.2717647058823538.731
934511AD1-075 C
Adder
7.0705882352941176.01
942342AE2-247 E
Adder
1.80235294117647071.532
919152AA1-139 E1
Adder
3.5635294117647063.029
3138116ELKO L286
Adder
1.2752941176470591.084
927041AC1-191 C
Adder
8.817647058823537.495
3150371LDYSMT1
50/50
4.2494.249
940541AE2-040 C
Adder
2.33294117647058831.983
940481AE2-033 C
Adder
13.13529411764705811.165
940482AE2-033 E
Adder
8.8552941176470597.527
923263AB1-132 E OP
Adder
0.58823529411764710.5
961611AG1-000B C
Adder
14.23176470588235412.097
926785AC1-164_E
Adder
16.5352941176470614.055
316084AB2-161 E
Adder
4.86352941176470654.134
940641AE2-051 C
Adder
13.71529411764705811.658
933982AD1-022 E
Adder
3.9882352941176473.39
3145946PLYMOUTH TP
Adder
0.271764705882352960.231
943471AF1-018 C
Adder
6.2364705882352955.301
3150701DARBY 4
50/50
2.3652.365
3142366NRTHEST
50/50
0.1710.171
315051AA1-145 CT1
50/50
4.7034.703
3150481FOUR RIVERF
50/50
3.5533.553
3150731STONECA
Adder
6.2458823529411775.309
935161AD1-151 C
Adder
14.5176470588235312.34
900672V4-068 E
Adder
0.29529411764705880.251
933981AD1-022 C
Adder
7.3258823529411776.227
3145393UNCAMP
Adder
5.1717647058823534.396
938531AE1-072 C
Adder
15.30823529411764713.012
932046AC2-012 E
Adder
11.5129411764705899.786
958161AF2-110 C
Adder
1.19176470588235281.013
CBM West 1LTFEXP_CBM-W1->PJM
CBM
45.86545.865
CBM West 2LTFEXP_CBM-W2->PJM
CBM
25.97725.977
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
5.1595.159
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
4.3484.348
CBM South 2LTFEXP_CBM-S2->PJM
CBM
81.51781.517
CPLELTFEXP_CPLE->PJM
CLTF
9.1099.109
LAGNLTFEXP_LAGN->PJM
CLTF
8.1928.192
TVALTFEXP_TVA->PJM
CLTF
6.5746.574
O66PJM->LTFIMP_O-066
CMTX_NF
40.55440.554
G-007PJM->LTFIMP_G-007
CMTX_NF
6.3886.388
SIGELTFEXP_SIGE->PJM
CLTF
0.3350.335
NYPJM->LTFIMP_NY
CLTF
2.8322.832
LGEELTFEXP_LGEE->PJM
CLTF
1.8211.821
WECLTFEXP_WEC->PJM
CLTF
0.9380.938

Details for AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AD2-074 TP-3LANCAST 115.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:101.31 %
Rating:203.98 MVA
Rating Type:A
MVA to Mitigate:206.65
MW Contribution:22.31
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
8.9228.922
966661AG1-536 C
50/50
11.51311.513
316078AC2-138 E
50/50
0.9270.927
936591AD2-074 C
50/50
15.39115.391
943742AF1-042 E
50/50
13.1413.14
962862AG1-135 E
50/50
9.269.26
966662AG1-536 E
50/50
15.4715.47
316077AC2-138 C
50/50
0.2260.226
3150351NORNECKC2
50/50
0.6470.647
961952AG1-038 E
50/50
12.29212.292
961951AG1-038 C
50/50
8.9018.901
936582AD2-073 E
Adder
0.364705882352941160.31
936592AD2-074 E
50/50
25.11225.112
316404AE1-155 C
50/50
4.5244.524
958261AF2-120 C
50/50
13.38413.384
957601AF2-054 C
Adder
-1.9929411764705882-1.694
943741AF1-042 C
50/50
8.0538.053
962861AG1-135 C
50/50
13.8913.89
3141813NORNECK
50/50
0.8820.882
939246AE1-155 E
50/50
18.63618.636
963611AG1-210 C
50/50
0.6620.662
926472AC1-118 E
Adder
0.343529411764705860.292
3150341NORNECKC1
50/50
0.6710.671
963612AG1-210 E
50/50
0.9930.993
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.060.06
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1230.123
G-007ALTFEXP_G-007A->PJM
CMTX
0.130.13
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.070.07
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0440.044
VTFLTFEXP_VFT->PJM
CMTX
0.3460.346
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0420.042
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1260.126
MDUPJM->LTFIMP_MDU
CLTF
0.0050.005
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.1420.142
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0850.085

Details for AE1-155 TAP-3GARNER 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AE1-155 TAP-3GARNER 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:129.26 %
Rating:203.98 MVA
Rating Type:B
MVA to Mitigate:263.66
MW Contribution:61.98
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
24.7924.79
966661AG1-536 C
50/50
31.98731.987
966662AG1-536 E
50/50
42.98342.983
316404AE1-155 C
50/50
12.57112.571
958261AF2-120 C
50/50
37.18537.185
939246AE1-155 E
50/50
51.77951.779
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
O66PJM->LTFIMP_O-066
CMTX_NF
0.2670.267
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0420.042
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023

Details for AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AE1-155 TAP-3NORNECK 115.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:159.51 %
Rating:203.98 MVA
Rating Type:A
MVA to Mitigate:325.36
MW Contribution:39.67
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
15.86815.868
966661AG1-536 C
50/50
20.47520.475
939612AE1-191 E
50/50
4.2254.225
957602AF2-054 E
50/50
1.3251.325
936591AD2-074 C
50/50
17.27617.276
3141843SHACKLE
50/50
0.3130.313
939602AE1-190 E
50/50
1.0561.056
943742AF1-042 E
50/50
14.74914.749
962862AG1-135 E
50/50
14.73114.731
966662AG1-536 E
50/50
27.51327.513
934392AD1-063 E
Adder
0.431764705882352940.367
939611AE1-191 C
50/50
1.0141.014
316404AE1-155 C
50/50
8.0478.047
958261AF2-120 C
50/50
23.80223.802
934146AD1-041 E
50/50
2.6412.641
957601AF2-054 C
50/50
1.9881.988
939601AE1-190 C
50/50
0.2510.251
316157AD2-030 E
50/50
1.1161.116
316156AD2-030 C
50/50
0.3550.355
961952AG1-038 E
50/50
13.79713.797
961951AG1-038 C
50/50
9.9919.991
925865AC1-065 E
50/50
9.8459.845
936592AD2-074 E
50/50
28.18728.187
943741AF1-042 C
50/50
9.049.04
962861AG1-135 C
50/50
22.09622.096
316280AD1-041 C
50/50
0.6420.642
316201AC1-065 C
50/50
0.9590.959
940551AE2-041 C
Adder
2.8823529411764712.45
957832AF2-077 E
Adder
0.67764705882352940.576
939246AE1-155 E
50/50
33.14333.143
943471AF1-018 C
Adder
2.8823529411764712.45
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.1130.113
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0560.056
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.9170.917
CPLELTFEXP_CPLE->PJM
CLTF
0.1180.118
MECLTFEXP_MEC->PJM
CLTF
0.0090.009
LAGNLTFEXP_LAGN->PJM
CLTF
0.0510.051
TVALTFEXP_TVA->PJM
CLTF
0.040.04
O66PJM->LTFIMP_O-066
CMTX_NF
0.6270.627
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0980.098
SIGELTFEXP_SIGE->PJM
CLTF
00
NYPJM->LTFIMP_NY
CLTF
0.0470.047
LGEELTFEXP_LGEE->PJM
CLTF
0.0010.001

Details for AF1-114 TP-6DAHLGREN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AF1-114 TP-6DAHLGREN 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 574_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.66 %
Rating:571.52 MVA
Rating Type:B
MVA to Mitigate:575.28
MW Contribution:13.04
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
5.2145.214
966661AG1-536 C
50/50
6.7286.728
316078AC2-138 E
50/50
1.3691.369
944491AF1-114 C
50/50
21.14521.145
316337AD2-073 C
50/50
0.6540.654
939612AE1-191 E
50/50
3.9073.907
957602AF2-054 E
50/50
1.011.01
936591AD2-074 C
50/50
6.236.23
3130536PAPERMILL
Adder
4.2870588235294123.644
939602AE1-190 E
50/50
0.9770.977
943742AF1-042 E
50/50
5.3195.319
962862AG1-135 E
50/50
4.9364.936
966662AG1-536 E
50/50
9.0419.041
944492AF1-114 E
50/50
29.229.2
934392AD1-063 E
50/50
0.7170.717
939611AE1-191 C
50/50
0.9380.938
316077AC2-138 C
50/50
0.3340.334
964211AG1-282 C
50/50
2.7362.736
316076AC2-137 E
Adder
0.457647058823529460.389
923842AB2-024 E
Adder
1.14941176470588240.977
939601AE1-190 C
50/50
0.2320.232
316157AD2-030 E
50/50
0.850.85
3150351NORNECKC2
50/50
0.9550.955
964212AG1-282 E
50/50
1.8241.824
962962AG1-145 E
Adder
0.52705882352941180.448
316156AD2-030 C
50/50
0.2710.271
961952AG1-038 E
50/50
4.9764.976
961951AG1-038 C
50/50
3.6033.603
316223AC1-118 C
50/50
0.7780.778
936582AD2-073 E
50/50
1.9881.988
925865AC1-065 E
50/50
11.05411.054
936592AD2-074 E
50/50
10.16510.165
316160AE1-175 E
Adder
0.435294117647058830.37
3150921YORKTN3
Adder
42.0694117647058835.759
316404AE1-155 C
50/50
2.6442.644
958261AF2-120 C
50/50
7.8217.821
934146AD1-041 E
50/50
2.4422.442
957601AF2-054 C
50/50
1.5141.514
940551AE2-041 C
50/50
4.7774.777
957832AF2-077 E
Adder
0.74823529411764710.636
943741AF1-042 C
50/50
3.263.26
962861AG1-135 C
50/50
7.4047.404
3141813NORNECK
50/50
1.3031.303
316280AD1-041 C
50/50
0.5940.594
939246AE1-155 E
50/50
10.89110.891
957972AF2-091 E
50/50
9.9289.928
957971AF2-091 C
50/50
7.1897.189
316169AC1-164 GEN
Adder
15.66117647058823413.312
963611AG1-210 C
50/50
0.9780.978
3138116ELKO L286
Adder
0.476470588235294150.405
316059AD1-063 C
50/50
0.1750.175
926472AC1-118 E
50/50
2.4632.463
926785AC1-164_E
Adder
7.0364705882352945.981
943471AF1-018 C
50/50
4.7774.777
3150341NORNECKC1
50/50
0.9910.991
963612AG1-210 E
50/50
1.4671.467
316201AC1-065 C
50/50
1.0771.077
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.2618.261
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.0475.047
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.9630.963
CBM South 2LTFEXP_CBM-S2->PJM
CBM
17.55217.552
CPLELTFEXP_CPLE->PJM
CLTF
2.0192.019
MECLTFEXP_MEC->PJM
CLTF
0.9640.964
LAGNLTFEXP_LAGN->PJM
CLTF
1.6361.636
TVALTFEXP_TVA->PJM
CLTF
1.3091.309
O66PJM->LTFIMP_O-066
CMTX_NF
7.0247.024
G-007PJM->LTFIMP_G-007
CMTX_NF
1.1051.105
SIGELTFEXP_SIGE->PJM
CLTF
0.0620.062
NYPJM->LTFIMP_NY
CLTF
0.50.5
LGEELTFEXP_LGEE->PJM
CLTF
0.3320.332
WECLTFEXP_WEC->PJM
CLTF
0.170.17

Details for AF2-013 TP-6ARNOLDS 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AF2-013 TP-6ARNOLDS 230.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 574_SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:102.08 %
Rating:559.3 MVA
Rating Type:B
MVA to Mitigate:570.92
MW Contribution:13.04
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
5.2145.214
966661AG1-536 C
50/50
6.7286.728
316078AC2-138 E
50/50
1.3691.369
944491AF1-114 C
50/50
21.14521.145
316337AD2-073 C
50/50
0.6540.654
939612AE1-191 E
50/50
3.9073.907
957602AF2-054 E
50/50
1.011.01
936591AD2-074 C
50/50
6.236.23
3130536PAPERMILL
Adder
4.2870588235294123.644
939602AE1-190 E
50/50
0.9770.977
943742AF1-042 E
50/50
5.3195.319
962862AG1-135 E
50/50
4.9364.936
966662AG1-536 E
50/50
9.0419.041
944492AF1-114 E
50/50
29.229.2
934392AD1-063 E
50/50
0.7170.717
939611AE1-191 C
50/50
0.9380.938
316077AC2-138 C
50/50
0.3340.334
957191AF2-013 C
50/50
65.45465.454
964211AG1-282 C
50/50
2.7362.736
923842AB2-024 E
Adder
1.14941176470588240.977
939601AE1-190 C
50/50
0.2320.232
316157AD2-030 E
50/50
0.850.85
3150351NORNECKC2
50/50
0.9550.955
964212AG1-282 E
50/50
1.8241.824
316156AD2-030 C
50/50
0.2710.271
961952AG1-038 E
50/50
4.9764.976
961951AG1-038 C
50/50
3.6033.603
316223AC1-118 C
50/50
0.7780.778
936582AD2-073 E
50/50
1.9881.988
925865AC1-065 E
50/50
11.05411.054
936592AD2-074 E
50/50
10.16510.165
316404AE1-155 C
50/50
2.6442.644
958261AF2-120 C
50/50
7.8217.821
934146AD1-041 E
50/50
2.4422.442
957601AF2-054 C
50/50
1.5141.514
940551AE2-041 C
50/50
4.7774.777
957832AF2-077 E
Adder
0.74823529411764710.636
943741AF1-042 C
50/50
3.263.26
962861AG1-135 C
50/50
7.4047.404
3141813NORNECK
50/50
1.3031.303
316280AD1-041 C
50/50
0.5940.594
939246AE1-155 E
50/50
10.89110.891
957972AF2-091 E
50/50
9.9289.928
957971AF2-091 C
50/50
7.1897.189
316169AC1-164 GEN
Adder
15.66117647058823413.312
963611AG1-210 C
50/50
0.9780.978
316059AD1-063 C
50/50
0.1750.175
926472AC1-118 E
50/50
2.4632.463
926785AC1-164_E
Adder
7.0364705882352945.981
943471AF1-018 C
50/50
4.7774.777
3150341NORNECKC1
50/50
0.9910.991
963612AG1-210 E
50/50
1.4671.467
316201AC1-065 C
50/50
1.0771.077
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.2618.261
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.0475.047
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
MECLTFEXP_MEC->PJM
CLTF
0.9640.964
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.9630.963
CBM South 2LTFEXP_CBM-S2->PJM
CBM
17.55217.552
LAGNLTFEXP_LAGN->PJM
CLTF
1.6361.636
CPLELTFEXP_CPLE->PJM
CLTF
2.0192.019
TVALTFEXP_TVA->PJM
CLTF
1.3091.309
O66PJM->LTFIMP_O-066
CMTX_NF
7.0247.024
G-007PJM->LTFIMP_G-007
CMTX_NF
1.1051.105
SIGELTFEXP_SIGE->PJM
CLTF
0.0620.062
NYPJM->LTFIMP_NY
CLTF
0.50.5
LGEELTFEXP_LGEE->PJM
CLTF
0.3320.332
WECLTFEXP_WEC->PJM
CLTF
0.170.17

Details for AG1-135 TP-AD2-074 TP 115.0 kV Ckt 1 line l/o DVP_P1-2: LN 65_SRT-SW-E


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
AG1-135 TP-AD2-074 TP 115.0 kV Ckt 1 line
Contingency Name:
DVP_P1-2: LN 65_SRT-SW-E
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:153.07 %
Rating:203.98 MVA
Rating Type:B
MVA to Mitigate:312.22
MW Contribution:61.98
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
958262AF2-120 E
50/50
24.7924.79
966661AG1-536 C
50/50
31.98731.987
962862AG1-135 E
50/50
23.9923.99
966662AG1-536 E
50/50
42.98342.983
316404AE1-155 C
50/50
12.57112.571
958261AF2-120 C
50/50
37.18537.185
962861AG1-135 C
50/50
35.98635.986
939246AE1-155 E
50/50
51.77951.779
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0220.022
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.030.03
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0690.069
O66PJM->LTFIMP_O-066
CMTX_NF
0.2670.267
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.040.04
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0420.042
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0140.014
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.1020.102
MDUPJM->LTFIMP_MDU
CLTF
0.0040.004
NYPJM->LTFIMP_NY
CLTF
0.0220.022
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0830.083
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0230.023
CONTINGENCY 'DVP_P1-2: LN 65_SRT-SW-E'
 OPEN BRANCH FROM BUS 314181 TO BUS 316399 CKT 1   /*3NORNECK     115.0 - AE1-155 TAP  115.0
END
CONTINGENCY 'DVP_P1-2: LN 594_SRT-S'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
CONTINGENCY 'DVP_P1-2: LN 573_SRT-A'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
314173 to 962860 ckt 1
313886 to 314174 ckt 1
314174 to 314176 ckt 1
314178 to 313813 ckt 1
313813 to 314191 ckt 1
313900 to 313886 ckt 1
313900 to 313886 ckt 2
313284 to 313828 ckt 1
314188 to 314387 ckt 1
314191 to 313870 ckt 1
313828 to 314177 ckt 1
314132 to 314163 ckt 1
314163 to 314137 ckt 1
314905 to 314900 ckt 1
314903 to 314908 ckt 1
314911 to 314905 ckt 1
314911 to 314922 ckt 1
936590 to 314178 ckt 1
316399 to 314173 ckt 1
316399 to 314181 ckt 1
944490 to 313810 ckt 1
957190 to 314131 ckt 1
962860 to 936590 ckt 1

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Light Load Analysis

The New Service Request AF2-120 was evaluated as a 62.0 MW injection in the Dominion area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Light Load Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Short Circuit Analysis

Based on PJM’s Short Circuit Analysis, this project did not contribute >1% fault duty to previously identified overdutied breakers, nor did it cause any new overdutied breakers.

Stability Analysis

Analysis Complete - Issues Found

Executive Summary for Dynamic Stability Analysis using PSSE

New Service Requests (projects) in PJM Transition Cycle 1 Cluster 32 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 32 projects.

This analysis is effectively a screening study to determine whether the addition of the Cluster 32 projects will meet the dynamics requirements of the NERC, Dominion Energy, and PJM reliability standards.

 

 

 Table 1: Transition Cycle 1 Cluster 32 Projects 

 

 

 

 

 

 

 

Cluster

Project

Fuel Type

Transmission Owner

MFO

(MW)

MWE

(MW)

MWC

(MW)

Point of Interconnection

32

AF2-120

Solar

Dominion

62

62

37.2

Garner – Northern Neck 115 kV

AG1-135

Solar

Dominion

60

60

36

Garner – Lancaster

115 kV

AG1-536

Battery

Dominion

75

75

32

Garner – Northern Neck 115 kV

 

For the Cluster 32 base run, the latest data from DP3 was used to update the models for the Cluster 32 generation in addition to removing withdrawn generation from the dispatch. Contingencies were updated to account for withdrawn projects.

 

Cluster 32 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. 105 initial contingencies were studied, each with a 20 second simulation time period. The contingencies studied included:

 

  • Steady-state operation (30 seconds)
  • Three-phase faults with normal clearing time
  • Single-phase bus faults with normal clearing time
  • Single-phase faults with stuck breaker
  • Single-phase faults with delayed clearing at remote end
  • Three-phase faults with loss of multiple-circuit tower line.

The results of the analysis identified TO criteria violations for outages of the Northern Neck – AE1-155 Tap 115 kV circuit (P103, P105, P409, P410, P412, P423, P501, P502) as observed in the Phase 3 analysis. The mitigation recommended from the Phase 3 analysis resolved the violations. It is recommended that a new second 115 kV transmission line be constructed from Northern Neck to AE1-155 Tap on a separate tower or structure, not sharing with the existing 115 kV transmission line from Northern Neck to AE1-155 Tap, to mitigate voltage instability. A new 115 kV breakers will be required at Northern Neck to complete a 5-breaker ring bus and AE1-155 to complete a 5-breaker ring bus. The two 115 kV line shall not share a common breaker such that a breaker failure or breaker stuck event could take out the two 115 kV lines from Northern Neck to AE1-155 Tap.

 

With the mitigation identified above, the results of the contingencies tested on the RTEP 2027 summer peak case found:

 

  • Cluster 32 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),
  • The system with Cluster 32 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.
  • Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus) and the final voltages are within the steady-state voltage ranges below per Dominion Energy’s transmission planning criteria.
    • P1 Category Contingencies:
      • 0.93 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.93 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.01 to 1.096 p.u. for 500 kV facilities
    • P2, P4, P5, and P7 Category Contingencies:
      • 0.90 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.90 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.00 to 1.096 p.u. for 500 kV facilities
  • No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

 

Protection trips for AF1-114 and AF2-091 were observed for some contingencies (P109, P110, P111, P112, P113, P115, P116) in both the pre and post network upgrade analysis. These protection trips were not investigated further for this analysis to determine if the network upgrade was still required after DP3 data changes.

Executive Summary for Dynamic Stability Analysis using PSCAD/EMT

 

Model Quality Testing Report

 

PSCAD model for Queue project AF2-120, AG1-135, AG1-146/147 and AG1-536 was developed and tested individually to ensure the model was in compliance with the PJM requirements. Test summary and result of test been summarized below in table 2. it is confirmed that PSCAD model was set up properly and satisfied the PJM requirement.

 

Table 2. MQT Result for each project

 

Test

Status

Flat Start Test 

Pass 

Voltage Step-Down 

Pass 

Voltage Step-Up 

Pass 

Frequency Step-Down, No Headroom

Pass 

Frequency Step-Down, Headroom

Pass 

Frequency Step-Up, Headroom 

Pass 

HVRT Leading

Pass 

HVRT Lagging

Pass 

LVRT Leading

Pass 

LVRT Lagging

Pass 

System Strength Test 

Pass 

Voltage Ride Through

Pass 

Phase Angle Step-Down 

Pass 

Phase Angle Step-Up 

Pass 

 

Weak Grid Assessment

 

This Weak Grid Assessment evaluates five projects from PJM Transition Cycle 1 (TC1) Cluster 32 for risk of voltage instability due to weak grid conditions in an EMT simulation environment.  The five projects, AF2-120, AG1-135, AG1-146, AG1-147, and AG1-536, were identified in the Cluster Study as having risk of undamped oscillations in multiple contingency cases, indicating system instability after dynamic simulation analysis in PSS/E. A network upgrade, a new second 115 kV transmission line from Northern Neck to AE1-155 Tap, was recommended along with evaluation using detailed models in an EMT simulation.

This assessment, completed by INS Engineering, aims to evaluate the risk of weak grid instability and verify the effectiveness of the recommended network upgrade in EMT simulation.  A summary description of each project is listed below:

 

 

Table 3. Summary Description of TC1 Cluster 32 Projects

 

 

 

 

Project Name

Project Type

Project Size (MW)

POI

POI Bus Number

AF2-120 Cerulean Solar

PV

62

Garner – Northern Neck 115 kV

939240

AG1-135 Moon Corner

PV

60

Garner – Lancaster

115 kV

962860

AG1-146/AG1-147 Merry Point 1 and 2 Solar

PV

100

Garner – Lancaster

115 kV

962970

AG1-536 Mulberry

BESS

75

Garner – Northern Neck 115 kV

939240

 

First, the individual project PSCAD models were evaluated for data consistency and model performance as part of the standard Model Quality Tests process, model updates being made where needed.  INS confirmed that the PSCAD models were set up properly and satisfied the requirements of PJM. After satisfactory configuration and performance of the individual project models were obtained, the models were integrated into a translated reduced network in PSCAD to create an overall detailed system model. 

 

A representative contingency case from the Cluster Study, considered effectively the worst case in terms of risk for weak grid instability, was then simulated in the PSCAD detailed system model. For Cluster 32, the following contingency case was chosen.

 

  • Fault ID P1.03: Fault at AE1-155 Tap 115 kV on AE1-155 Tap – Northern Neck 115 kV circuit #1059. Fault cleared with loss of Northen Neck 115/34.5 kV Transformer #1

 

Simulation results in PSCAD are summarized below.  In Case 1a with the PSCAD detailed system model, weak grid oscillations and unstable recovery are observed without the network upgrade. With the network upgrade added in Case 1b, stable recovery is observed due to sufficient grid strength. These results are consistent with the results in the Cluster Study.

 

Table 4. Summary of cases tested in PSCAD system study

 

 

 

Case ID

Fault Description

Cluster Study Result [1]

PSCAD Study Result

Case 1a

P1.03, without network upgrade

Unstable

Unstable

Case 1b

P1.03, with network upgrade

Stable

Stable

Case 2a

P1.03, without network upgrade, modified PPC tuning

-

Stable*

* Details in Appendix B. Although a stable response was observed in this case, a detailed tuning evaluation over multiple operating conditions would be needed to verify robustness of the modified tuning.

 

As a potential alternative solution, PPC parameter were tuned to be more appropriate for weak grid conditions and this configuration was evaluated in base case P1.03, without the network upgrade – Case 2a. A stable response was observed in Case 2a, however, a detailed tuning evaluation over multiple operating conditions would be needed to verify robustness of this modified tuning.  As such, the modified tuning results in Appendix B should be considered for information only.

Based on the simulation results described above, the results of this assessment show stable recovery in the worst-case contingency when the network upgrade is included.  These results support the conclusion from the Cluster Study that the proposed network upgrade mitigates potential weak grid instability issues.

Reactive Power Analysis

The reactive power capability of AF2-120 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AA1-063ACarolina–Seaboard 115kVIn Service
AA1-065Earleys 230kVIn Service
AA1-139Hickory-Shawboro 230kVIn Service
AA1-145Four Rivers 230kVIn Service
AA2-088Boykins-Handsome 115kVIn Service
AA2-178Mackeys 230kVIn Service
AB1-027Old Church 34.5 KVIn Service
AB1-132Thelma 230kVIn Service
AB1-173Brink-Trego 115kVIn Service
AB2-022Elizabeth City 34.5kVIn Service
AB2-024Correctional 34.5kVIn Service
AB2-025Sapony 34.5kVIn Service
AB2-040Brink 115kVIn Service
AB2-099Ahoskie 34.5kVIn Service
AB2-100Clubhouse-Lakeview 230kVIn Service
AB2-134Hopewell-Surry 230kVIn Service
AB2-161Waverly #2 DP 115kVIn Service
AB2-174Emporia-Trego 115kVIn Service
AB2-190Hopewell-Surry 230kVIn Service
AC1-027Pendleton 34.5kVIn Service
AC1-065Harmony Village-Shackleford 115kVSuspended
AC1-086Thelma 230kVUnder Construction
AC1-112Old Church 34.5kVIn Service
AC1-118Westmoreland 34.5kVIn Service
AC1-147Grassfield 34.5kVIn Service
AC1-161Septa 500kVIn Service
AC1-164Chickahominy 230kVPartially in Service - Under Construction
AC1-191Elmont 115kVEngineering & Procurement
AC1-216Hopewell-Surry 230kVIn Service
AC2-012Grassfield-Great Bridge 115kVIn Service
AC2-079Ivor-Oak Ridge 115kVUnder Construction
AC2-137Elko 34.5kVIn Service
AC2-138Northern Neck 34.5kVIn Service
AC2-141Septa 500kVEngineering & Procurement
AD1-022Cashie-Trowbridge 230 kVEngineering & Procurement
AD1-025Hopewell-Surry 230 kVIn Service
AD1-033Fentress-Landstown 230 kVIn Service
AD1-041Harmony Village-Shackleford 115 kVIn Service
AD1-063Harmony Village 34.5 kVIn Service
AD1-074Trowbridge 230 kVEngineering & Procurement
AD1-075Trowbridge 230 kVEngineering & Procurement
AD1-076Trowbridge 230 kVEngineering & Procurement
AD1-082Bakers Pond-Ivor 115kVIn Service
AD1-105Kings Dominion DP 115 kVUnder Construction
AD1-144Kings Fork 34.5 kVIn Service
AD1-151Hopewell-Surry 230 kVSuspended
AD2-030Wan 34.5 kVIn Service
AD2-073Sanders DP 230 kVIn Service
AD2-074Garner DP-Lancaster 115 kVUnder Construction
AD2-085Myrtle-Windsor DP 115kVEngineering & Procurement
AE1-072Shawboro-Sligo 230 kVUnder Construction
AE1-074Winterpock 34.5 kVUnder Construction
AE1-103Holland-Union Camp 115 kVSuspended
AE1-149Disputanta-Poe 115 kVSuspended
AE1-155Garner-Northern Neck 115 kVIn Service
AE1-157Ladysmith CT-St. Johns 230 kVUnder Construction
AE1-162Smithfield 34.5 kVIn Service
AE1-173Carson-Suffolk 500 kVUnder Construction
AE1-175Light Foot 34.5 kVIn Service
AE1-190Harmony Village-Shackleford 115 kVIn Service
AE1-191Harmony Village-Shackleford 115 kVIn Service
AE2-027Harrowgate-Locks 115kVSuspended
AE2-033Clubhouse-Sapony 230 kVSuspended
AE2-034Mackeys 230 kVPartially in Service - Under Construction
AE2-040Sapony 34.5 kVIn Service
AE2-041Harmony Village 230 kVEngineering & Procurement
AE2-051Carson-Septa 500 kVEngineering & Procurement
AE2-094Carson-Rogers Road 500 kVEngineering & Procurement
AE2-104Suffolk 115 kVWithdrawn
AE2-156Yadkin 115 kVEngineering & Procurement
AE2-212Harrowgate 34 kVEngineering & Procurement
AE2-247Myrtle-Windsor 115 kVEngineering & Procurement
AE2-253Hickory-Moyock 230 kVIn Service
AE2-346Ahoskie 34.5 kVIn Service
AF1-017Myrtle-Windsor 115 kVEngineering & Procurement
AF1-018Harmony Village 230 kVEngineering & Procurement
AF1-032Suffolk 34.5 kVIn Service
AF1-042Garner DP-Lancaster 115 kVEngineering & Procurement
AF1-069Carson-Rogers Rd 500 kVEngineering & Procurement
AF1-114Oak Grove-Dahlgren 230 kVEngineering & Procurement
AF1-123Harper 230 kVUnder Construction
AF1-124Harper 230 kVPartially in Service - Under Construction
AF1-125Harper 230 kVUnder Construction
AF1-128Chesterfield 230 kVUnder Construction
AF1-129Chesterfield 230 kVEngineering & Procurement
AF1-291Tyler 34.5 kVEngineering & Procurement
AF1-292Fields 34.5kVUnder Construction
AF2-013Arnold's Corner-Dahlgren 230 kVEngineering & Procurement
AF2-043Suffolk 34.5 kVIn Service
AF2-054Wan 34.5 kVIn Service
AF2-077White Marsh 34.5 kVIn Service
AF2-081Moyock 230 kVEngineering & Procurement
AF2-091Oak Grove-Dahlgren 230 kVEngineering & Procurement
AF2-110Suffolk 115 kVWithdrawn
AF2-299Fields 34.5 kVEngineering & Procurement
AG1-037Ahoskie 34.5 kVWithdrawn
AG1-038Garner DP-Lancaster 115 kVEngineering & Procurement
AG1-135Garner-Lancaster 115 kVUnder Construction
AG1-145Lightfoot 34.5 kVIn Service
AG1-210Northern Neck 34.5 kVWithdrawn
AG1-282Dunnsville 34.5 kVWithdrawn
AG1-532Fields 34.5 kVUnder Construction
AG1-536Garner-Northern Neck 115 kVEngineering & Procurement
AG1-558Buckner 34.5 kVWithdrawn
AG1-559Caroline Pines 22 kVWithdrawn
V4-068Murphy's 34.5kVIn Service
W1-029Winfall 230kVIn Service
Y1-086Morgans CornerIn Service
Z1-036WinFall-Chowan 230kVIn Service
Z1-068Birdneck 34.5kVIn Service
Z2-027Pasquotank 34.5kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In coordination with other Affected System Operators, PJM has determined that the Affected System Operator for this project that requires an Affected System Study. For the latest Affected System Study results pertaining this project, please refer to your Affected System Study report by the Affected System Operator. If the Affected System Operator identified the need for a system reinforcement on their system due to their planning criteria, Project Developer must follow the Affected System Operator Tariff for construction of the network upgrade. PJM lists any required network upgrades identified by the Affected System Operator in the PJM Project Developer’s GIA under Schedule F.

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Final System Impact Study analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AF2-120 System Reinforcements:
TORTEP IDTitleCategoryAllocated Cost ($USD)Facilities Study
Dominionn9651.0Wreck and rebuild 10.05 miles of Line 1059 between Northern Neck and Moon Corner with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C and replace line lead at Moon Corner (AE1-155).Cost Allocated$8,962,270
Dominionn8492Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.Cost Allocated$4,673,802
Dominionn9630.0Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.Cost Allocated$4,179,767
Dominionn9267.0Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.Cost Allocated$2,665,925
Dominionn7553Replace Northern Neck 115/230 kV transformer #6 with a 224 MVA (260/271/295 MVA).Cost Allocated$2,597,162
Dominionn9259.0Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.Cost Allocated$1,475,199
Dominionn9380.0Replace existing Ladysmith 230/500 kV transformer 1 with four (4) 480 MVA single phase transformers.Cost Allocated$1,304,375
Dominionn8492.1Two Breaker Additions at Fentress Substation.Cost Allocated$1,162,785
Dominionn9207.0Replace 6ELMONT 230 kV to 8ELMONT 500 kV circuit 1 with larger transformer (3-480 MVA single phase transformer).Cost Allocated$957,860
Dominionn8492.2Expand Yadkin Substation to accommodate the new 500 kV line.Cost Allocated$944,826
Dominionb4000.357Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.Contingent$0N/A
Dominionb4000.356Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).Contingent$0N/A
Dominionb4000.355Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).Contingent$0N/A
Dominionb4000.352Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.Contingent$0N/A
Dominionb4000.351Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).Contingent$0N/A
Dominionb4000.350Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).Contingent$0N/A
Dominionb4000.349Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).Contingent$0N/A
Dominionb4000.348Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.Contingent$0N/A
Dominionb4000.346Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substationContingent$0N/A
Dominionb4000.345Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.Contingent$0N/A
Dominionb4000.344Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.Contingent$0N/A
Dominionb4000.342Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.Contingent$0N/A
Dominionb4000.341Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.Contingent$0N/A
Dominionb4000.325Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.Contingent$0N/A
Dominionb4000.326At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.Contingent$0N/A
Dominionb4000.327Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.Contingent$0N/A
Dominions3047.2Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.Contingent$0N/A
Dominionb3800.312Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.Contingent$0N/A
Dominionb3800.313Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.Contingent$0N/A
Dominionb3800.356Build a new 500 kV line from Vint Hill to Wishing Star.Contingent$0N/A
Dominionb3800.357Build a new 500 kV line from Morrisville to Vint Hill.Contingent$0N/A
Dominionb3800.354Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.Contingent$0N/A
Grand Total:$28,923,971

PJM evaluated the impact of topology changing reinforcements to mitigate the impacts driven by New Service Requests. PJM determined which reinforcements were eliminated as a result of modeling the topology changing reinforcements. PJM then grouped the topology changing and eliminated reinforcements by region and computed a discount factor to apply to reinforcements to reduce the cost of all these reinforcements down to the cost of contstructing only the topology changing reinforcements. For additional details, please click the icon below

Regional Topology Upgrade Conversion

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n9267.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9267.0 / TC1-PH2-DOM-067
Title
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.
Description
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner substations with single (1) 768.2 ACSS/TW “Maumee” at 250 degrees C. This new line will be on separate transmission towers from the existing Northern Neck and Moon Corner line 1059. Station expansion is required at Northern Neck and Moon Corner to accommodate the new line.
Total Cost ($USD)
$45,730,074
Discounted Total Cost ($USD)
$12,600,436
Allocated Cost ($USD)
$3,965,684
Time Estimate
45 to 46 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

FacilityContingency
3HARMONY-6HARMONY 115.0/230.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
3NORNECK-AE1-155 TAP 115.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A786.0 MVA
(All)B786.0 MVA
(All)C904.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-120124.0 MW31.5%$3,965,684
AG1-135120.0 MW30.5%$3,837,738
AG1-536150.0 MW38.1%$4,797,013
System Reinforcement: n9267.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9267.0 / TC1-PH2-DOM-067
Title
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.
Description
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner substations with single (1) 768.2 ACSS/TW “Maumee” at 250 degrees C. This new line will be on separate transmission towers from the existing Northern Neck and Moon Corner line 1059. Station expansion is required at Northern Neck and Moon Corner to accommodate the new line.
Total Cost ($USD)
$45,730,074
Allocated Cost ($USD)
$2,665,925
Time Estimate
45 to 46 Months
Cost Alloc Type
Cost Allocated
Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AF1-12313.4501 %$6,150,726
AF1-12413.4979 %$6,172,618
AF1-12513.2418 %$6,055,486
AF1-2940.3249 %$148,594
AF2-04231.9983 %$14,632,826
AF2-1150.1981 %$90,608
AF2-1205.8297 %$2,665,925
AF2-2223.9954 %$1,827,098
AG1-0210.1585 %$72,486
AG1-1243.1793 %$1,453,884
AG1-1355.5860 %$2,554,482
AG1-2852.9906 %$1,367,604
AG1-5365.5494 %$2,537,736

System Reinforcement
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
(Pending) / dom-281
Title
ELIMINATED FOR TC1 - Rebuild 7.91 miles of 230 kV Line 2083 from Birchwood to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor 250 degrees C.
Description
Rebuild 7.91 miles of 230 kV Line 2083 from Birchwood to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor 250 degrees C.
Total Cost ($USD)
$35,735,843
Discounted Total Cost ($USD)
$9,846,632
Allocated Cost ($USD)
$3,508,322
Time Estimate
43 to 44 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A876.0 MVA
(All)B956.0 MVA
(All)C1163.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
7.8 MW35.6%$3,508,322
AG1-1357.4 MW33.7%$3,320,793
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
6.7 MW30.6%$3,017,516

System Reinforcement
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
(Pending) / dom-286
Title
ELIMINATED FOR TC1: Rebuild 6.46 mi miles of 2-545.6 ACAR (15/7) 90 MOT 230 kV Line 2083 from Fredericksburg to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C.
Description
Rebuild 6.46 mi miles of 2-545.6 ACAR (15/7) 90 MOT 230 kV Line 2083 from Fredericksburg to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C.
Total Cost ($USD)
$33,559,690
Discounted Total Cost ($USD)
$9,247,016
Allocated Cost ($USD)
$3,294,681
Time Estimate
43 to 44 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

FacilityContingency
6FREDBRG-6FINES 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A721.0 MVA
(All)B721.0 MVA
(All)C829.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
7.8 MW35.6%$3,294,681
AG1-1357.4 MW33.7%$3,118,572
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
6.7 MW30.6%$2,833,763

System Reinforcement
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
(Pending) / TC1-PH2-DOM-030
Title
ELIMINATED FOR TC1: Reconductor 6.01 miles of 115 kV Line 65 from AG1-146 Tap to Lancaster with (1) 768.2 ACSS/TW (20/70 "Maumee" conductor @ 250 degrees C.
Description
Reconductor 6.01 miles of 115 kV Line 65 from AG1-146 Tap to Lancaster with (1) 768.2 ACSS/TW (20/70 "Maumee" conductor @ 250 degrees C.
Total Cost ($USD)
$27,984,346
Discounted Total Cost ($USD)
$7,710,789
Allocated Cost ($USD)
$2,726,618
Time Estimate
43 to 44 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

FacilityContingency
3LANCAST-AD2-074 TP 115.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A393.0 MVA
(All)B393.0 MVA
(All)C452.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
37.2 MW35.4%$2,726,618
AG1-13536.0 MW34.2%$2,638,700
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
32.0 MW30.4%$2,345,471

System Reinforcement: n9651.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9651.0 / TC1-PH2-DOM-009
Title
Wreck and rebuild 10.05 miles of Line 1059 between Northern Neck and Moon Corner with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C and replace line lead at Moon Corner (AE1-155).
Description
Wreck and rebuild 10.05 miles of Line 1059 between Northern Neck and Moon Corner with (1) 768.2 ACSS/TW (20/7) "MAUMEE" at 250 degrees C and replace line lead at Moon Corner (AE1-155).
Total Cost ($USD)
$28,476,954
Discounted Total Cost ($USD)
$28,476,954
Allocated Cost ($USD)
$8,962,270
Time Estimate
Mar 31 2029

Contributor

FacilityContingency
3NORNECK-AE1-155 TAP 115.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
LLA282.0 MVA
LLB296.0 MVA
LLC348.0 MVA
SUMA243.0 MVA
SUMB260.0 MVA
SUMC337.0 MVA
WINA289.0 MVA
WINB303.0 MVA
WINC351.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
62.0 MW31.5%$8,962,270
AG1-13560.0 MW30.5%$8,673,193
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
75.0 MW38.1%$10,841,491

System Reinforcement
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
(Pending) / dom-461
Title
ELIMINATED FOR TC1: Reconductor 3.53 miles of 115 kV Line 65 from AD2-074 Tap to AG1-146 Tap with (1) 768.2 ACSS/TW (20/70) "Maumee" conductor @ 250 degrees C
Description
Reconductor 3.53 miles of 115 kV Line 65 from AD2-074 Tap to AG1-146 Tap with (1) 768.2 ACSS/TW (20/70) "Maumee" conductor @ 250 degrees C
Total Cost ($USD)
$16,493,251
Discounted Total Cost ($USD)
$4,544,540
Allocated Cost ($USD)
$1,606,998
Time Estimate
43 to 44 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

FacilityContingency
3LANCAST-AD2-074 TP 115.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A393.0 MVA
(All)B393.0 MVA
(All)C452.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
37.2 MW35.4%$1,606,998
AG1-13536.0 MW34.2%$1,555,182
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
32.0 MW30.4%$1,382,360

System Reinforcement: n7553
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n7553 / dom-427
Title
Replace Northern Neck 115/230 kV transformer #6 with a 224 MVA (260/271/295 MVA).
Description
Replace Northern Neck 115/230 kV transformer #6 with a 224 MVA (260/271/295 MVA).
Total Cost ($USD)
$7,242,347
Discounted Total Cost ($USD)
$7,242,347
Allocated Cost ($USD)
$2,597,162
Time Estimate
59 to 60 Months

Contributor

FacilityContingency
3NORNECK-6NORNECK 115.0/230.0 kV Ckt 2 transformer(Any)
Rating SetRating TypeRating Value
LLA310.0 MVA
LLB320.0 MVA
LLC344.0 MVA
SUMA260.0 MVA
SUMB271.0 MVA
SUMC295.0 MVA
WINA332.0 MVA
WINB340.0 MVA
WINC358.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
24.0 MW35.9%$2,597,162
AG1-13522.2 MW33.3%$2,411,008
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
20.6 MW30.8%$2,234,177

System Reinforcement: n9380.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9380.0 / TC1-PH3-DOM-012
Title
Replace existing Ladysmith 230/500 kV transformer 1 with four (4) 480 MVA single phase transformers.
Description
Replace existing Ladysmith 230/500 kV transformer 1 with four (4) 480 MVA single phase transformers.
Total Cost ($USD)
$37,587,605
Discounted Total Cost ($USD)
$37,587,605
Allocated Cost ($USD)
$1,304,375
Time Estimate
Dec 31 2029

Contributor

FacilityContingency
6LADYSMITH-8LADYSMITH 230.0/500.0 kV Ckt 1 transformer(Any)
Rating SetRating TypeRating Value
(All)A1707.0 MVA
(All)B1758.0 MVA
(All)C1873.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
70.3 MW30.9%$11,614,950
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
70.5 MW31.0%$11,656,754
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
69.2 MW30.4%$11,433,686
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
7.9 MW3.5%$1,304,375
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
9.5 MW4.2%$1,577,841

System Reinforcement: n9207.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9207.0 / TC1-PH2-DOM-018
Title
Replace 6ELMONT 230 kV to 8ELMONT 500 kV circuit 1 with larger transformer (3-480 MVA single phase transformer).
Description
Replace 6ELMONT 230 KV to 8ELMONT 500 kV ckt 1 with Larger XFRM. (3-480 MVA Single Phase XFRM).
Total Cost ($USD)
$38,254,469
Discounted Total Cost ($USD)
$38,254,469
Allocated Cost ($USD)
$957,860
Time Estimate
Dec 31 2028

Contributor

FacilityContingency
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer(Any)
Rating SetRating TypeRating Value
(All)A1707.0 MVA
(All)B1758.0 MVA
(All)C1873.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AE2-15614.4 MW3.6%$1,375,093
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
118.1 MW29.5%$11,275,111
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
118.6 MW29.6%$11,315,765
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
116.3 MW29.0%$11,099,228
AF2-08111.2 MW2.8%$1,072,666
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
10.0 MW2.5%$957,860
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
12.1 MW3.0%$1,158,746

System Reinforcement: b4000.344
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.344
Title
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.344
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.344
Title
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.345
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.345
Title
Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.345
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.345
Title
Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.346
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.346
Title
Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substation
Description
Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substation
Cost Information
Time Estimate
Jun 01 2029

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.346
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.346
Title
Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substation
Description
Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substation
Cost Information
Time Estimate
Jun 01 2029
Cost Alloc Type
Contingent

System Reinforcement: b4000.348
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.348
Title
Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.
Description
Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. A new redundant breaker ring will be added at Thornburg (formerly Kraken) to accommodate the new 500kV line from North Anna to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Jun 01 2029

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.348
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.348
Title
Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.
Description
Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. A new redundant breaker ring will be added at Thornburg (formerly Kraken) to accommodate the new 500kV line from North Anna to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Jun 01 2029
Cost Alloc Type
Contingent

System Reinforcement: b4000.349
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.349
Title
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).
Description
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.349
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.349
Title
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).
Description
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.350
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.350
Title
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).
Description
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.350
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.350
Title
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).
Description
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.351
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.351
Title
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).
Description
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.351
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.351
Title
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).
Description
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.352
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.352
Title
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.
Description
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.352
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.352
Title
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.
Description
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.357
Title
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Description
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Cost Information
Time Estimate
Jun 01 2029

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.357
Title
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Description
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Cost Information
Time Estimate
Jun 01 2029
Cost Alloc Type
Contingent

System Reinforcement: b4000.341
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.341
Title
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.
Description
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV substation and extend approximately 0.2 miles of conductor to fly-over the site.
Cost Information
Time Estimate
Jul 13 2029

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.341
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.341
Title
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.
Description
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV substation and extend approximately 0.2 miles of conductor to fly-over the site.
Cost Information
Time Estimate
Jul 13 2029
Cost Alloc Type
Contingent

System Reinforcement: b4000.342
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.342
Title
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Description
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Cost Information
Time Estimate
Jul 13 2029

Not ContingentTopology Changing

Note 1: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6BIRCHWD-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6CRANES-6FREDBRG 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: 574T575_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H1T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P4-2: H2T574_SRT-S
No new ratings for this Flowgate.
6FREDBRG-6FINES 230.0 kV Ckt 1 lineDVP_P1-2: LN 574_SRT-L
No new ratings for this Flowgate.
6GARSVL-6AQUI_HARB_B 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8BRISTER-8CHANCE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8CHANCE-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P1-2: LN 557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-L
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer(Any)
No new ratings for this Flowgate.
6ARNOLDS-AF2-013 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6DAHLGREN-AF1-114 TP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
System Reinforcement: b4000.342
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.342
Title
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Description
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Cost Information
Time Estimate
Jul 13 2029
Cost Alloc Type
Contingent

System Reinforcement: b3692
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3692
Title
Rebuild approximately 27.7-miles of 500 kV transmission line from Elmont to Chickahominy.
Description
Rebuild approximately 27.7-miles of 500 kV transmission line from Elmont to Chickahominy with current 500 kV standards construction practices to achieve a summer rating of 4330 MVA. Projected ISD: 06/01/2026
Cost Information
Time Estimate
Jun 01 2026

Not Contingent

Note: AF2-120 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AF2-120 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
8CHCKAHM-8ELMONT 500.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A4330.0 MVA
(All)B4330.0 MVA
(All)C5011.0 MVA

System Reinforcement: n6161
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n6161 / dom-039
Title
ELIMINATED FOR TC1: Replace 500 kV circuit breaker H1T561 at Clifton with a higher rated device (Clifton - Ox).
Description
Replace 500 kV circuit breaker H1T561 at Clifton with a higher rated device (Clifton - Ox).
Total Cost ($USD)
$2,634,901
Discounted Total Cost ($USD)
$2,634,901
Allocated Cost ($USD)
$0
Time Estimate
Dec 31 2029

Potential Aggregate ContributorEliminated

Note 1: Based on PJM cost allocation criteria, AF2-120 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AF2-120 could receive cost allocation. Although AF2-120 may not presently have cost responsibility for this upgrade, AF2-120 is a potential Aggregate Pool Contributor.

Note 2: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle.

FacilityContingency
8CLIFTON-8OX 500.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A2857.0 MVA
(All)B3117.0 MVA
(All)C3793.0 MVA

System Reinforcement
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
(Pending) / TC1-PH2-DOM-040
Title
ELIM TC1: Wreck and rebuild 18.75 miles of Line 594 btwn Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) Dipper at 110 degrees C and assoc substation work (new rating: 4356/4356/5009 MVA)
Description
Wreck and rebuild 18.75 miles of Line 594 between Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA.
Total Cost ($USD)
$128,018,212
Discounted Total Cost ($USD)
$128,018,212
Allocated Cost ($USD)
$0
Time Estimate
60 to 61 Months

Potential Aggregate ContributorEliminated

Note 1: Based on PJM cost allocation criteria, AF2-120 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AF2-120 could receive cost allocation. Although AF2-120 may not presently have cost responsibility for this upgrade, AF2-120 is a potential Aggregate Pool Contributor.

Note 2: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle.

FacilityContingency
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA

System Reinforcement: n9247.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9247.0 / TC1-PH2-DOM-041
Title
ELIM TC1: Wreck and rebuild 14.02 miles of Line 573 btwn Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work (new rating: 4356/4356/5009 MVA)
Description
Wreck and rebuild 14.02 miles of Line 573 between Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA
Total Cost ($USD)
$99,636,684
Discounted Total Cost ($USD)
$99,636,684
Allocated Cost ($USD)
$0
Time Estimate
48 Months

Potential Aggregate ContributorEliminated

Note 1: Based on PJM cost allocation criteria, AF2-120 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AF2-120 could receive cost allocation. Although AF2-120 may not presently have cost responsibility for this upgrade, AF2-120 is a potential Aggregate Pool Contributor.

Note 2: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A4356.0 MVA
(All)B4356.0 MVA
(All)C5009.0 MVA

System Reinforcement: n8492

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n8492
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492
Title
Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.
Description
Wreck and rebuild one (1) overhead 500kV transmission line that will start at the existing Fentress 500 kV Substation and terminate at the existing Yadkin 500 kV Substation, located approximately 13.5 miles away.
Total Cost ($USD)
$80,172,278
Allocated Cost ($USD)
$4,673,802
Time Estimate
Dec 31 2026
Cost Alloc Type
Cost Allocated
Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AF1-12313.4501 %$10,783,252
AF1-12413.4979 %$10,821,574
AF1-12513.2418 %$10,616,253
AF1-2940.3249 %$260,480
AF2-04231.9983 %$25,653,766
AF2-1150.1981 %$158,821
AF2-1205.8297 %$4,673,803
AF2-2223.9954 %$3,203,203
AG1-0210.1585 %$127,073
AG1-1243.1793 %$2,548,917
AG1-1355.5860 %$4,478,423
AG1-2852.9906 %$2,397,632
AG1-5365.5494 %$4,449,080

System Reinforcement: n9630.0

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9630.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9630.0 / TC1-PH3-DOM-013
Title
Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.
Description
n9630.0 addresses both stability and load flow violations. Construct a new 230 kV Line from the AG1-285 substation to the 230 kV Finneywood substation following the Line 1012 ROW for approximately 1.0 miles, then following the Line 556 ROW for approximately 3.5 miles to terminate at Finneywood. Expand the AG1-285 115 kV substation to accommodate two (2) new 115/230 kV transformers. Build a 230 kV substation at AG1-285 to connect the 115/230 kV transformers and the new 230 kV line to Finneywood. Expand the Finneywood 230 kV substation to accommodate the new line. The existing 1.0 miles of 115 kV from AG1-285 to Chase City does not need to be rebuilt to accommodate a new structure in the same right of way and therefore will be unchanged. The existing 3.5 miles of 500 kV towers from Structure 556/46 to Finneywood substation will need to be rebuilt as a double circuit tower to accommodate the new 230 kV line.
Total Cost ($USD)
$71,697,833
Allocated Cost ($USD)
$4,179,767
Time Estimate
Dec 31 2029
Cost Alloc Type
Cost Allocated
Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AF1-12313.4501 %$9,643,430
AF1-12413.4979 %$9,677,702
AF1-12513.2418 %$9,494,084
AF1-2940.3249 %$232,946
AF2-04231.9983 %$22,942,088
AF2-1150.1981 %$142,033
AF2-1205.8297 %$4,179,769
AF2-2223.9954 %$2,864,615
AG1-0210.1585 %$113,641
AG1-1243.1793 %$2,279,489
AG1-1355.5860 %$4,005,041
AG1-2852.9906 %$2,144,195
AG1-5365.5494 %$3,978,800

System Reinforcement: n9259.0

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9259.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9259.0
Title
Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.
Description
Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.
Total Cost ($USD)
$25,304,902
Allocated Cost ($USD)
$1,475,199
Time Estimate
Jan 01 2030
Cost Alloc Type
Cost Allocated
Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AF1-12313.4501 %$3,403,535
AF1-12413.4979 %$3,415,630
AF1-12513.2418 %$3,350,825
AF1-2940.3249 %$82,216
AF2-04231.9983 %$8,097,138
AF2-1150.1981 %$50,129
AF2-1205.8297 %$1,475,200
AF2-2223.9954 %$1,011,032
AG1-0210.1585 %$40,108
AG1-1243.1793 %$804,519
AG1-1355.5860 %$1,413,532
AG1-2852.9906 %$756,768
AG1-5365.5494 %$1,404,270

System Reinforcement: n8492.1

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n8492.1
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.1
Title
Two Breaker Additions at Fentress Substation.
Description
Install Two 5000 amp GIS Breakers at Fentress Substation to connect the new 500 kV line 5005.
Total Cost ($USD)
$19,945,879
Allocated Cost ($USD)
$1,162,785
Time Estimate
Dec 31 2026
Cost Alloc Type
Cost Allocated
Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AF1-12313.4501 %$2,682,741
AF1-12413.4979 %$2,692,275
AF1-12513.2418 %$2,641,193
AF1-2940.3249 %$64,804
AF2-04231.9983 %$6,382,342
AF2-1150.1981 %$39,513
AF2-1205.8297 %$1,162,785
AF2-2223.9954 %$796,918
AG1-0210.1585 %$31,614
AG1-1243.1793 %$634,139
AG1-1355.5860 %$1,114,177
AG1-2852.9906 %$596,501
AG1-5365.5494 %$1,106,877

System Reinforcement: n8492.2

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n8492.2
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.2
Title
Expand Yadkin Substation to accommodate the new 500 kV line.
Description
Expansion of yadkins 500 kV switchyard to accommodate the new 500 kV line which includes addition of 5000 amp GIS breakers and relocation of the existing suffolk -yadkin 500 kV line#565
Total Cost ($USD)
$16,207,123
Allocated Cost ($USD)
$944,826
Time Estimate
Dec 31 2026
Cost Alloc Type
Cost Allocated
Cost Allocation
ProjectPercent AllocationAllocated Cost ($USD)
AF1-12313.4501 %$2,179,874
AF1-12413.4979 %$2,187,621
AF1-12513.2418 %$2,146,115
AF1-2940.3249 %$52,657
AF2-04231.9983 %$5,186,004
AF2-1150.1981 %$32,106
AF2-1205.8297 %$944,827
AF2-2223.9954 %$647,539
AG1-0210.1585 %$25,688
AG1-1243.1793 %$515,273
AG1-1355.5860 %$905,330
AG1-2852.9906 %$484,690
AG1-5365.5494 %$899,398

System Reinforcement: b4000.356

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.356
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.356
Title
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
Description
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.355

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.355
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.355
Title
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
Description
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.325

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.325
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.325
Title
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Description
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.326

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.326
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.326
Title
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Description
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.327

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.327
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.327
Title
Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.
Description
Upgrade/install equipment at Ladysmith substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230kV strings of breaker and a half scheme.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: s3047.2

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: s3047.2
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
s3047.2
Title
Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.
Description
Install (2) 1400 MVA 500-230 kV transformers and associated 500 kV and 230 kV equipment (breakers, switches, leads) at Vint Hill Substation to supply the area with a 500 kV source Cut and loop 500 kV line #535 Loudoun – Meadowbrook and #569 Loudoun - Morrisville as the 500 kV sources into the proposed 500 kV ring bus Vint Hill Substation will be expanded to the north of the existing site to accommodate the 500 kV ring required for the addition of the new transformers Existing terminations for 230 kV line #2174 Wheeler – Vint Hill, line #2101 Bristers – Vint Hill, and line #2163 Liberty – Vint Hill will be rearranged to terminate into the expanded Vint Hill Substation 230 kV line #2114 Remington CT – Rollins Ford will also be cut and looped into the expanded Vint Hill Substation due to spatial constraints along the existing right-of-way.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.312

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.312
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.312
Title
Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.
Description
Rebuild 500kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way. New conductor to have a summer rating of 4357 MVA.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.313

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.313
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.313
Title
Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.
Description
Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.356

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.356
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.356
Title
Build a new 500 kV line from Vint Hill to Wishing Star.
Description
Build a new 500kV line from Vint Hill to Wishing Star. The line will be supported on single circuit monopoles. New conductor to have a summer rating of 4357 MVA. Line length is approximately 16.59 miles
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.357

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.357
Title
Build a new 500 kV line from Morrisville to Vint Hill.
Description
Build a new 500kV line from Morrisville to Vint Hill. New conductor to have a summer rating of 4357 MVA. Line length is approximately 19.71 miles.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.354

AF2-120 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.354
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.354
Title
Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.
Description
Install terminal equipment at Wishing Star substation to support a 5000A line to Vint Hill. Update relay settings for 500kV Lines #546 and #590.
Cost Information
Cost Alloc Type
Contingent

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AF2-120


AF2-120 Contributions into Topology or Eliminated Reinforcements:
TypeTORTEP ID / TO IDTitleTopo or ElimMW ImpactPercent AllocationCategoryAllocated Cost ($USD)
StabilityDominionn9267.0 / TC1-PH2-DOM-067Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.Topology124.0 MW31.5%Cost Allocated$3,965,684
Load FlowDominion(Pending) / dom-281ELIMINATED FOR TC1 - Rebuild 7.91 miles of 230 kV Line 2083 from Birchwood to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor 250 degrees C.Eliminated7.8 MW35.6%Cost Allocated$3,508,322
Load FlowDominion(Pending) / dom-286ELIMINATED FOR TC1: Rebuild 6.46 mi miles of 2-545.6 ACAR (15/7) 90 MOT 230 kV Line 2083 from Fredericksburg to Fines with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C.Eliminated7.8 MW35.6%Cost Allocated$3,294,681
Load FlowDominion(Pending) / TC1-PH2-DOM-030ELIMINATED FOR TC1: Reconductor 6.01 miles of 115 kV Line 65 from AG1-146 Tap to Lancaster with (1) 768.2 ACSS/TW (20/70 "Maumee" conductor @ 250 degrees C.Eliminated37.2 MW35.4%Cost Allocated$2,726,618
Load FlowDominion(Pending) / dom-461ELIMINATED FOR TC1: Reconductor 3.53 miles of 115 kV Line 65 from AD2-074 Tap to AG1-146 Tap with (1) 768.2 ACSS/TW (20/70) "Maumee" conductor @ 250 degrees CEliminated37.2 MW35.4%Cost Allocated$1,606,998
Contributions into Topology or Eliminated Reinforcement Total:$15,102,303
AF2-120 Contingent Region Topology Upgrades:
TORTEP IDTitleCategoryAllocated Cost ($USD)
Dominionn8492Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.Cost Allocated$4,673,802
Dominionn9630.0Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.Cost Allocated$4,179,767
Dominionn9267.0Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.Cost Allocated$2,665,925
Dominionn9259.0Install two 230 kV gas insulated switchgear ("GIS") bus ties at the Fentress 230 kV substation.Cost Allocated$1,475,199
Dominionn8492.1Two Breaker Additions at Fentress Substation.Cost Allocated$1,162,785
Dominionn8492.2Expand Yadkin Substation to accommodate the new 500 kV line.Cost Allocated$944,826
Dominionb4000.357Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.Contingent$0
Dominionb4000.356Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).Contingent$0
Dominionb4000.355Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).Contingent$0
Dominionb4000.352Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.Contingent$0
Dominionb4000.351Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).Contingent$0
Dominionb4000.350Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).Contingent$0
Dominionb4000.349Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).Contingent$0
Dominionb4000.348Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.Contingent$0
Dominionb4000.346Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substationContingent$0
Dominionb4000.345Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.Contingent$0
Dominionb4000.344Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.Contingent$0
Dominionb4000.342Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.Contingent$0
Dominionb4000.341Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.Contingent$0
Dominionb4000.325Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.Contingent$0
Dominionb4000.326At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.Contingent$0
Dominionb4000.327Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.Contingent$0
Dominions3047.2Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.Contingent$0
Dominionb3800.312Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.Contingent$0
Dominionb3800.313Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.Contingent$0
Dominionb3800.356Build a new 500 kV line from Vint Hill to Wishing Star.Contingent$0
Dominionb3800.357Build a new 500 kV line from Morrisville to Vint Hill.Contingent$0
Dominionb3800.354Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.Contingent$0
Region Topology Upgrade Total:$15,102,304

Attachments

AF2-120 One Line Diagram

AF2-120 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.