AG1-374 Final System Impact Study (Retool 2) Report

v2.00 released 2026-05-14 11:56

Blue Mound 345 kV

180.0 MW Capacity / 300.0 MW Energy

Introduction

This Final System Impact Study (SIS) Report has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 314 for New Service Requests (projects) in Transition Cycle 1 (TC1). The Project Developer/Eligible Customer (developer) is Deriva Energy Solar, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Commonwealth Edison Company.

Preface

The Final System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Final System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 5, Final Agreement Negotiation Phase, the purpose of the Final Agreement Negotiation Phase is to:

  1. Negotiate, execute and enter into the applicable final interconnection related service agreement found in Tariff, Part IX;
  2. Conduct any remaining analyses or updated analyses based on New Service Requests withdrawn during Decision Point III (DP3); and
  3. Adjust the security obligation based on New Service Requests withdrawn during Decision Point III and/or during the Final Agreement Negotiation Phase.
Retool 1:

In accordance with PJM Tariff Part VII.D 314 B(1)(a), Final Agreement Negotiation Phase:

  • PJM will perform a retool (Retool 1) after the conclusion of DP3 considering only the projects moving on in the Final Agreement Negotiation Phase (Removes DP3 withdrawals).
  • The Final System Impact Study reflecting results from the retooled analysis (Retool 1) will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • PJM will provide updated final electronic agreements to Project Developers and Eligible Customers in the Cycle reflecting updates from the Final System Impact Study after Retool 1 including the adjusted Security requirements.

The AG1-374 Final System Impact Study (Retool 1) Report is available for download here.

Retool 2 (if needed):

If particular New Service Requests do not sign their final agreements after receiving the updated information after Retool 1, there may be the need to run a second retool (Retool 2) to identify if any network upgrades are no longer necessary:

  • PJM will perform Retool 2 (if necessary) considering only the removal of projects from the model which chose not to execute their agreements after Retool 1.
  • The updated Final System Impact Study reflecting results from Retool 2 will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • If there are any adjustments to the agreements required after Retool 2, the necessary network upgrade or Security changes will be handled via the scope change process post-GIA.

General

The Project Developer has proposed a Solar generating facility located in the Commonwealth Edison Company zone — McLean County, Illinois. The installed facilities will have a total capability of 300.0 MW with 180.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG1-374
Project Name:
Blue Mound 345 kV
Project Developer Name:
Deriva Energy Solar, LLC
State:
Illinois
County:
McLean
Transmission Owner:
Commonwealth Edison Company
MFO:
300.0
MWE:
300.0
MWC:
180.0
Fuel Type:
Solar
Basecase Study Year:
2027

Physical Interconnection Facility Study

Received

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AG1-374 will interconnect on the ComEd transmission system via a direct connection into the TSS 178 Blue Mound 345 kV substation.

 

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. The Facilities Studies for the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades were performed by the Transmission Owner in Phase II. Facilities Studies are available for download on PJM.com (see General Section for document links). The Interconnected Transmission Owner has performed a Facilities Study for the required System Reliability Network Upgrades in Phase III (see System Reinforcement Section for document links).

Based on the Final SIS results, the AG1-374 project has the following allocation of costs for interconnection. The Security amount required after the Final SIS and revised agreements is also shown below.

Cost Summary
DescriptionCost Allocated to AG1-374Cost Subject to Security*
Transmission Owner Interconnection Facilities (TOIF)$2,382,120$2,382,120
Other Scope$0$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0
Network Upgrades$19,794,599$19,794,599
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$1,285,183$1,285,183
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violations$1,210,019$0
AFS - Non-PJM Violations$695,326 **$0 **
Total$25,367,248$23,461,902

* Contributes to calculation for Security. See Security Requirement Section of this report for additional detail.

** This value reflects the results at the time of the report posting and it is subject to change. AFS – Non-PJM Violations are not subject to Security. For latest AFS – Non-PJM Violations, please refer to the latest Affected System Study Report for your project.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Security Requirement

Per Tariff Part VII, Subpart D, section 314 (Final Agreement Negotiation Phase) A.1 and PJM Manual 14H, Section 5, if a Transition Cycle 1 New Service Request is withdrawn during Decision Point III and/or the Final Agreement Negotiation Phase, PJM shall remove the New Service Request from the Cycle and adjust the Security obligations of other New Service Requests based on the withdrawal. The Final System Impact Study results will reflect the updated Security amount for this project. Security may be in the form of cash, letter of credit, or other form of Security acceptable to PJM (see PJM M14H, Section 6.4).

Security is calculated for a New Service Request based on the Network Upgrade costs allocated pursuant to the Final System Impact Study results.

Note 1: "Network Upgrades" referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Security Due for AG1-374

Security has been calculated for the AG1-374 project(s) based on the Final System Impact Study results and is shown in the table below. This Security must be provided at Final SIS through either a wire transfer or letter of credit or other form of Security deemed acceptable by PJM per Manual 14H, Section 6.4.

Security Due for AG1-374
Project(s): AG1-374
Final Agreement Security (A): $23,461,902
Portion of Costs Already Paid (B): $0
Revised Net Security (C): A B = $23,461,902
Security on Hand with PJM (D): $29,211,687
Additional Security Due at Agreement Execution (E): C D = $0
Note:

In accordance with Tariff, Part VII, Subpart D, section 314(B)(4)(a) (Final Agreement Negotiation Phase) failure to provide any required adjustments to Security within the 15 Business Day period will result in the New Service Request project being terminated and withdrawn.

Please see the cover letter for more details on Letter of Credit/Wire details to satisfy the additional Security requirement.

If no additional Security is required, please coordinate with your assigned Project Manager to initiate any refunds of Security reductions.

Transmission Owner Scope of Work

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Scope
Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
n9366.0

Expand the 345 kV ring bus TSS178 Blue Mound substation with a new breaker and bay position

$8,619,492$4,071,499$2,138,068$241,534$15,070,593$15,070,593
n9365.0

Reroute L9515 transmission line for approximately 0.17 miles

$2,542,006$1,071,909$630,546$63,589$4,308,050$4,308,050
n9364.0

Perform Relaying Upgrades at TSS95 Chestnut

$281,309$61,235$69,779$3,633$415,956$415,956
Transmission Owner Interconnection Facilities
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Construct Transmission Owner Interconnection Facilities from the Point of Change in Ownership to the TSS178 Blue Mound substation

$405,535$1,770,935$100,593$105,057$2,382,120$2,382,120

Based on the scope of work for the Interconnection Facilities, it is expected to take 24 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase II of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Notes on Cost Estimate:

  1. These estimates are Order-of-Magnitude estimates of the costs that ComEd would bill to the Project Developer for this interconnection. These estimates are based on a one-line electrical diagram of the project and the information provided by the Project Developer.
  2. There were no site visits performed for these estimates. There may be costs related to specific site related issues that are not identified in these estimates. The site reviews will be performed during the Facilities Study or during detailed engineering.
  3. These estimates are not a guarantee of the maximum amount payable by the Project Developer and the actual costs of ComEd's work may differ significantly from these estimates. The Project Developer will be responsible for paying actual costs of ComEd's work in accordance with the PJM Open Access Transmission Tariff.
  4. The Project Developer is responsible for all engineering, procurement, testing and construction of all equipment on the Project Developer’s side of the Point of Change in Ownership.

These cost estimates do not include cost of acquiring right-of-way for the transmission line and purchasing any additional land, if needed, for the line terminations.

 

Transmission Owner Analysis

No Transmission Owner impacts identified.

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. ComEd interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AG1-374 was evaluated as a 300.0 MW (180.0 MW Capacity) injection in the ComEd area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1AEP/DEI
05EUGENE-08CAYSUB 345.0 kV Ckt 1 line
AEP_P7-1_#11014___SRT-A-1
TowerAC106.03 %1374.0B1456.8923.44
GD1AEP/DEI
05EUGENE-08CAYSUB 345.0 kV Ckt 1 line
AEP_P7-1_#11042___SRT-A
TowerAC104.37 %1374.0B1434.020.63

Details for 05EUGENE-08CAYSUB 345.0 kV Ckt 1 line l/o AEP_P7-1_#11014___SRT-A-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DEI
Facility Description:
05EUGENE-08CAYSUB 345.0 kV Ckt 1 line
Contingency Name:
AEP_P7-1_#11014___SRT-A-1
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:106.03 %
Rating:1374.0 MVA
Rating Type:B
MVA to Mitigate:1456.89
MW Contribution:23.44
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:AEP/DEI
Facility Description:
05EUGENE-08CAYSUB 345.0 kV Ckt 1 line
Contingency Name:
AEP_P7-1_#11014___SRT-A-1
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:106.52 %
Rating:1374.0 MVA
Rating Type:B
MVA to Mitigate:1463.53
MW Contribution:23.51
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
925772AC1-053 E
Adder
16.4529411764705913.985
939742AE1-205 E
Adder
8.7811764705882357.464
957382AF2-032 E
Adder
0.56470588235294120.48
965911AG1-460 C
Adder
1.05647058823529430.898
942112AE2-223 E
Adder
9.8788235294117658.397
959612AF2-252 E
Adder
2.3435294117647061.992
930461AB1-087 C
50/50
11.00811.008
942601AE2-276 C
50/50
6.2976.297
963742AG1-226 E
50/50
163.607163.607
939741AE1-205 C
Adder
6.3588235294117655.405
917502Z2-087 E
Adder
13.17176470588235311.196
942111AE2-223 C
Adder
1.4764705882352941.255
960612AF2-352 E
Adder
2.3435294117647061.992
942481AE2-261 C
Adder
15.78941176470588213.421
959611AF2-252 C
Adder
1.56235294117647071.328
924266AB2-070 E
Adder
15.03529411764705912.78
957381AF2-032 C
Adder
1.21.02
965912AG1-460 E
Adder
1.58470588235294121.347
936971AD2-131 C
Adder
0.72588235294117650.617
963841AG1-237 C
50/50
13.81113.811
942482AE2-261 E
Adder
10.5258823529411768.947
936972AD2-131 E
Adder
3.6470588235294123.1
960611AF2-352 C
Adder
1.56235294117647071.328
274891CAYUG;2U E
Adder
6.3117647058823545.365
930462AB1-087 E
50/50
3.1493.149
959341AF2-225 C
Adder
4.76941176470588254.054
924048AB2-047 E1
Adder
8.1682352941176476.943
965091AG1-374 C
Adder
14.06117647058823611.952
965092AG1-374 E
Adder
9.3741176470588247.968
960141AF2-305_AG1-
Adder
0.87882352941176480.747
936772AD2-100 E
Adder
7.3470588235294126.245
945391AF1-204 C
50/50
33.86833.868
930472AB1-088 E
50/50
3.1493.149
290261S-027 E
Adder
12.74941176470588310.837
290265S-028 E
Adder
12.67058823529411710.77
936771AD2-100 C
Adder
11.0211764705882369.368
930471AB1-088 C
50/50
10.83910.839
963842AG1-237 E
50/50
92.42492.424
274890CAYUG;1U E
Adder
6.3117647058823545.365
959342AF2-225 E
Adder
6.58588235294117655.598
924049AB2-047 E2
Adder
8.2964705882352947.052
945392AF1-204 E
50/50
101.603101.603
944222AF1-090 E
Adder
14.15411764705882512.031
933441AC2-157 C
50/50
9.5729.572
276174W4-005 E
Adder
25.1282352941176521.359
276615W2-048 GEN
Adder
5.00470588235294044.254
933442AC2-157 E
50/50
15.61715.617
963741AG1-226 C
50/50
75.42975.429
276621X2-022 GEN
Adder
17.1305882352941214.561
944221AF1-090 C
Adder
3.0235294117647062.57
991267J1714
External Queue
6.6428618431091316.642861843109131
991278J1725 C
External Queue
0.89081788063049320.8908178806304932
991279J1725 E
External Queue
4.8195528984069824.819552898406982
992572J1022
External Queue
23.22961807250976623.229618072509766
954822J955
External Queue
78.483375549316478.4833755493164
991037J1464 G
External Queue
40.3800392150878940.38003921508789
991082J1475 G
External Queue
7.53433370590217.5343337059021
956452J1139
External Queue
34.8682594299316434.86825942993164
990353J1289 C
External Queue
1.89602935314178471.8960293531417847
956282J1115 C
External Queue
3.15266180038452153.1526618003845215
990672J1360
External Queue
49.1416816711425849.14168167114258
990272J1263 G
External Queue
34.4398612976074234.43986129760742
956283J1115 E
External Queue
17.0567092895507817.05670928955078
991192J1610 G
External Queue
7.133558273315437.13355827331543
990354J1289 E
External Queue
10.25800514221191410.258005142211914
990057J1201
External Queue
2.86680364608764652.8668036460876465
991197J1626
External Queue
9.9642925262451179.964292526245117
991217J1653
External Queue
8.5655565261840828.565556526184082
CBM West 1LTFEXP_CBM-W1->PJM
CBM
29.38929.389
NYPJM->LTFIMP_NY
CLTF
0.3780.378
TVALTFEXP_TVA->PJM
CLTF
1.1281.128
LAGNLTFEXP_LAGN->PJM
CLTF
2.632.63
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0860.086
MECLTFEXP_MEC->PJM
CLTF
5.8845.884
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1550.155
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6960.696
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0330.033
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.8452.845
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.0794.079
WECLTFEXP_WEC->PJM
CLTF
1.0231.023
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.8660.866
O66PJM->LTFIMP_O-066
CMTX_NF
4.4694.469

Details for 05EUGENE-08CAYSUB 345.0 kV Ckt 1 line l/o AEP_P7-1_#11042___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP/DEI
Facility Description:
05EUGENE-08CAYSUB 345.0 kV Ckt 1 line
Contingency Name:
AEP_P7-1_#11042___SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:104.37 %
Rating:1374.0 MVA
Rating Type:B
MVA to Mitigate:1434.0
MW Contribution:20.63
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:AEP/DEI
Facility Description:
05EUGENE-08CAYSUB 345.0 kV Ckt 1 line
Contingency Name:
AEP_P7-1_#11042___SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:104.68 %
Rating:1374.0 MVA
Rating Type:B
MVA to Mitigate:1438.33
MW Contribution:20.68
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
925772AC1-053 E
Adder
14.23647058823529612.101
24386605FR-22G C
50/50
0.5890.589
946581AF1-322 C
50/50
23.27323.273
939742AE1-205 E
Adder
7.7894117647058836.621
957382AF2-032 E
Adder
0.481176470588235260.409
965911AG1-460 C
Adder
0.90.765
24790405FR-3G E
50/50
46.21546.215
24691005MDL-2G C
50/50
0.6880.688
930041AB1-006 E1
50/50
42.18242.182
942112AE2-223 E
Adder
8.7623529411764727.448
959612AF2-252 E
Adder
2.0635294117647061.754
930461AB1-087 C
50/50
10.5810.58
942601AE2-276 C
50/50
6.0526.052
963742AG1-226 E
50/50
107.265107.265
24791305MDL-4G E
50/50
24.43624.436
939741AE1-205 C
Adder
5.644.794
917502Z2-087 E
Adder
11.6835294117647069.931
942111AE2-223 C
Adder
1.30941176470588231.113
960612AF2-352 E
Adder
2.0635294117647061.754
24791205MDL-3G E
50/50
23.46723.467
942481AE2-261 C
Adder
13.44941176470588411.432
24790305FR-22G E
50/50
23.82823.828
24387305FR-4G C
50/50
1.3181.318
24790105FR-12G E
50/50
23.32923.329
966841AG1-555 C
50/50
24.49324.493
24690905MDL-1G C
50/50
1.1731.173
959611AF2-252 C
Adder
1.3752941176470591.169
924266AB2-070 E
Adder
13.03176470588235211.077
957381AF2-032 C
Adder
1.02352941176470580.87
965912AG1-460 E
Adder
1.34941176470588231.147
936971AD2-131 C
Adder
0.61647058823529410.524
963841AG1-237 C
50/50
8.1778.177
942482AE2-261 E
Adder
8.9658823529411777.621
936972AD2-131 E
Adder
3.09764705882352942.633
24790205FR-21G E
50/50
24.79824.798
966842AG1-555 E
50/50
8.7558.755
960611AF2-352 C
Adder
1.3752941176470591.169
24387005FR-3G C
50/50
0.5660.566
946582AF1-322 E
50/50
32.13932.139
930042AB1-006 E2
50/50
6.0266.026
247943T-127 E
50/50
22.10922.109
930462AB1-087 E
50/50
3.0263.026
24386205FR-12G C
50/50
0.5660.566
24697605MDL-3G C
50/50
0.6930.693
959341AF2-225 C
Adder
4.23058823529411753.596
924048AB2-047 E1
Adder
7.24470588235294166.158
965091AG1-374 C
Adder
12.3810.523
965092AG1-374 E
Adder
8.2529411764705877.015
960141AF2-305_AG1-
Adder
0.76117647058823530.647
936772AD2-100 E
Adder
6.2388235294117655.303
945391AF1-204 C
50/50
29.75729.757
930472AB1-088 E
50/50
3.0263.026
24385905FR-11G C
50/50
1.1631.163
290261S-027 E
Adder
11.2247058823529419.541
290265S-028 E
Adder
11.1564705882352969.483
936771AD2-100 C
Adder
9.3588235294117657.955
930471AB1-088 C
50/50
10.41710.417
963842AG1-237 E
50/50
54.72654.726
24790005FR-11G E
50/50
23.68923.689
959342AF2-225 E
Adder
5.8423529411764714.966
924049AB2-047 E2
Adder
7.3588235294117656.255
945392AF1-204 E
50/50
89.27189.271
24386405FR-21G C
50/50
0.5890.589
24755605MDL-5G
50/50
0.9150.915
24697905MDL-4G C
50/50
0.5340.534
944222AF1-090 E
Adder
11.90588235294117510.12
933441AC2-157 C
50/50
9.1999.199
24790605MDL-1G E
50/50
48.7948.79
276174W4-005 E
Adder
21.75294117647058618.49
276615W2-048 GEN
Adder
4.3141176470588243.667
933442AC2-157 E
50/50
15.00915.009
963741AG1-226 C
50/50
49.45349.453
270180AB1-006 W1
50/50
1.031.03
24790705MDL-2G E
50/50
23.49423.494
270181AB1-006 W2
50/50
0.1470.147
276621X2-022 GEN
Adder
14.76705882352941212.552
944221AF1-090 C
Adder
2.54235294117647072.161
24790505FR-4G E
50/50
36.62836.628
992572J1022
External Queue
20.71624565124511720.716245651245117
954822J955
External Queue
70.3055114746093870.30551147460938
991037J1464 G
External Queue
36.4587669372558636.45876693725586
991082J1475 G
External Queue
7.1702575683593757.170257568359375
956452J1139
External Queue
30.61046409606933630.610464096069336
956282J1115 C
External Queue
2.8334677219390872.833467721939087
990672J1360
External Queue
43.548694610595743.5486946105957
990272J1263 G
External Queue
28.79624748229980528.796247482299805
956283J1115 E
External Queue
15.32978725433349615.329787254333496
991192J1610 G
External Queue
6.4510769844055186.451076984405518
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7110.711
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1160.116
BlueGrassPJM->LTFIMP_BlueG
CLTF
3.6773.677
WECLTFEXP_WEC->PJM
CLTF
0.9720.972
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
1.1131.113
O66PJM->LTFIMP_O-066
CMTX_NF
4.5614.561
CBM West 1LTFEXP_CBM-W1->PJM
CBM
28.12128.121
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.210.21
MECLTFEXP_MEC->PJM
CLTF
5.0675.067
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.2990.299
NYPJM->LTFIMP_NY
CLTF
0.3810.381
TVALTFEXP_TVA->PJM
CLTF
0.3420.342
LAGNLTFEXP_LAGN->PJM
CLTF
1.6091.609
CONTINGENCY 'AEP_P7-1_#11014___SRT-A-1'
 OPEN BRANCH FROM BUS 243217 TO BUS 247712 CKT 1   /*05DEQUIN     345.0 - 05SULLIVAN   345.0
 OPEN BRANCH FROM BUS 243217 TO BUS 963840 CKT 1   /*05DEQUIN     345.0 - AG1-237 TP   345.0
END
CONTINGENCY 'AEP_P7-1_#11042___SRT-A'
 OPEN BRANCH FROM BUS 243878 TO BUS 255205 CKT 1   /*05MEADOW     345.0 - 17REYNOLDS   345.0
 OPEN BRANCH FROM BUS 243878 TO BUS 255205 CKT 2   /*05MEADOW     345.0 - 17REYNOLDS   345.0
END
243221 to 249504 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1AEP/NIPS
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
765-L11215__-S_SRT-A
SingleAC143.99 %1075.0B1547.9119.2
GD1AEP/NIPS
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
AEP_P1-2_#695_1681_SRT-A
SingleAC143.99 %1075.0B1547.8719.2
GD1AEP/NIPS
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
Base Case
SingleAC108.83 %1075.0A1169.9311.24
GD1CE/NIPS
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
AEP_P1-2_#695_1681_SRT-A
SingleAC100.5 %1399.0B1405.9516.39
GD1CE/NIPS
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
765-L11215__-S_SRT-A
SingleAC100.5 %1399.0B1405.9316.39
GD1CE
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
COMED_P4_112-45-BT4-5___SRT-A
BreakerAC100.41 %2297.0STE2306.4723.01
GD1CE
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
COMED_P4_012-45-BT12-14_SRT-A
BreakerAC130.94 %2107.0STE2758.84124.66
GD1CE
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
COMED_P4_012-45-BT14-15_SRT-A
BreakerAC127.29 %2107.0STE2682.0124.27
GD1CE
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
COMED_P4_012-45-BT12-14_SRT-A
BreakerAC139.84 %1837.0STE2568.92124.73
GD1CE
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
COMED_P4_012-45-BT14-15_SRT-A
BreakerAC135.76 %1837.0STE2493.84124.34

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:AEP/NIPS
Facility Description:
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
Contingency Name:
765-L11215__-S_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:143.99 %
Rating:1075.0 MVA
Rating Type:B
MVA to Mitigate:1547.91
MW Contribution:19.2
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
274753CRETE EC ;3U
80/20
1.941.94
274793SE CHICAG;0U
80/20
7.1437.143
274795SE CHICAG;2U
80/20
7.1437.143
962781AG1-127 C
Adder
7.92823529411764756.739
933911AD1-013 C
Adder
2.08705882352941161.774
274788SE CHICAG;5U
80/20
7.2327.232
274798UNIV PARK;1U
80/20
1.4061.406
958011AF2-095 C
80/20
13.59713.597
933411AC2-154 C
80/20
2.992.99
274687WILL CNTY;4U
Adder
78.0176470588235366.315
966091AG1-478 C
Adder
2.38941176470588262.031
966441AG1-513 C
Adder
0.57647058823529410.49
959081AF2-199 C
Adder
8.0647058823529436.855
942111AE2-223 C
Adder
2.17764705882352951.851
939741AE1-205 C
Adder
9.3811764705882357.974
959351AF2-226 C
Adder
2.89058823529411772.457
958491AF2-143 C
Adder
12.40117647058823610.541
965931AG1-462 C
Adder
18.16117647058823415.437
274754CRETE EC ;4U
80/20
1.941.94
274887PILOT HIL;1U
80/20
0.8970.897
934111AD2-000 2
Adder
6.8035294117647065.783
274683WAUKEGAN ;8U
Adder
50.3941176470588342.835
961501AF2-441 C
80/20
14.87514.875
274826FISK ;BP
80/20
2.6552.655
939351AE1-166 C
Adder
11.6094117647058829.868
274675JOLIET 29;7U
Adder
82.4117647058823570.05
274674JOLIET 9 ;6U
Adder
42.3282352941176535.979
943121AE2-341 C
Adder
14.46117647058823512.292
939321AE1-163 C
Adder
6.7517647058823535.739
946321AF1-296 C
Adder
4.0305882352941183.426
934101AD2-000 1
Adder
6.542352941176475.561
942421AE2-255 C
Adder
3.42117647058823552.908
926821AC1-168 C
Adder
1.28941176470588251.096
959611AF2-252 C
Adder
2.1329411764705881.813
274752CRETE EC ;2U
80/20
1.941.94
274794SE CHICAG;1U
80/20
7.1437.143
936371AD2-047 C
80/20
5.355.35
936461AD2-060 C
80/20
3.1473.147
946671AF1-331 C
Adder
2.71058823529411752.304
960611AF2-352 C
Adder
2.1329411764705881.813
274800UNIV PARK;3U
80/20
1.3961.396
941551AE2-152 C
Adder
13.39529411764705811.386
274676JOLIET 29;8U
Adder
82.4152941176470670.053
958481AF2-142 C
Adder
12.7223529411764710.814
274790SE CHICAG;7U
80/20
7.2327.232
274791SE CHICAG;8U
80/20
7.2327.232
274789SE CHICAG;6U
80/20
7.2327.232
274682WAUKEGAN ;7U
Adder
46.7423529411764739.731
942651AE2-281 C
Adder
0.96470588235294120.82
962691AG1-118 C
Adder
25.1023529411764721.337
938851AE1-113 C
Adder
9.0329411764705887.678
959091AF2-200 C
Adder
16.12823529411764813.709
959341AF2-225 C
Adder
7.0364705882352945.981
965091AG1-374 C
Adder
19.1976470588235316.318
276164X3-005 C
80/20
0.0990.099
274827FISK ;RP
80/20
1.8821.882
957331AF2-027 C
Adder
2.82588235294117672.402
936511AD2-066 C
Adder
9.5376470588235298.107
939061AE1-134 2
Adder
1.54823529411764721.316
274792SE CHICAG;9U
80/20
7.1437.143
274799UNIV PARK;2U
80/20
1.3961.396
274801UNIV PARK;4U
80/20
1.3961.396
274751CRETE EC ;1U
80/20
1.941.94
274723RIVER EC ;12
80/20
5.1225.122
274724RIVER EC ;11
80/20
5.1235.123
960281AF2-319 C
Adder
2.89058823529411772.457
957471AF2-041 C
Adder
24.1929411764705920.564
938861AE1-114 C
Adder
4.4423529411764713.776
274888KELLY CRK;1U
80/20
0.8970.897
943591AF1-030 C
Adder
9.6164705882352938.174
957371AF2-031 C
80/20
1.5531.553
960591AF2-350 C
80/20
9.4429.442
960751AF2-366 C
Adder
7.9070588235294126.721
990552J1334 G
External Queue
40.5239410400390640.52394104003906
990557J1335 G
External Queue
40.5239410400390640.52394104003906
990562J1336 G
External Queue
40.5239410400390640.52394104003906
990577J1339
External Queue
26.57409286499023426.574092864990234
991247J1684 G
External Queue
33.61624908447265633.616249084472656
990647J1355
External Queue
42.268421173095742.2684211730957
955742J1058 G
External Queue
35.2828559875488335.28285598754883
990762J1386
External Queue
12.93081378936767612.930813789367676
990547J1333 G
External Queue
40.5239410400390640.52394104003906
990582J1340
External Queue
26.57409286499023426.574092864990234
990662J1358
External Queue
14.93047237396240214.930472373962402
991332J1785
External Queue
13.53217792510986313.532177925109863
CBM West 1LTFEXP_CBM-W1->PJM
CBM
118.129118.129
WECLTFEXP_WEC->PJM
CLTF
4.4234.423
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.510.51
SIGELTFEXP_SIGE->PJM
CLTF
0.060.06
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.2810.281
BlueGrassPJM->LTFIMP_BlueG
CLTF
1.4171.417
NYPJM->LTFIMP_NY
CLTF
1.271.27
TVALTFEXP_TVA->PJM
CLTF
1.7951.795
LAGNLTFEXP_LAGN->PJM
CLTF
4.3274.327
CBM West 2LTFEXP_CBM-W2->PJM
CBM
18.88718.887
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.5520.552
MECLTFEXP_MEC->PJM
CLTF
14.93414.934
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.8260.826

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:AEP/NIPS
Facility Description:
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#695_1681_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:143.99 %
Rating:1075.0 MVA
Rating Type:B
MVA to Mitigate:1547.87
MW Contribution:19.2
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
274753CRETE EC ;3U
80/20
1.941.94
274793SE CHICAG;0U
80/20
7.1437.143
274795SE CHICAG;2U
80/20
7.1437.143
962781AG1-127 C
Adder
7.92823529411764756.739
933911AD1-013 C
Adder
2.08705882352941161.774
274788SE CHICAG;5U
80/20
7.2327.232
274798UNIV PARK;1U
80/20
1.4061.406
958011AF2-095 C
80/20
13.59713.597
933411AC2-154 C
80/20
2.992.99
274687WILL CNTY;4U
Adder
78.0176470588235366.315
966091AG1-478 C
Adder
2.38941176470588262.031
966441AG1-513 C
Adder
0.57647058823529410.49
959081AF2-199 C
Adder
8.0647058823529436.855
942111AE2-223 C
Adder
2.17764705882352951.851
939741AE1-205 C
Adder
9.3811764705882357.974
959351AF2-226 C
Adder
2.89058823529411772.457
958491AF2-143 C
Adder
12.40117647058823610.541
965931AG1-462 C
Adder
18.16117647058823415.437
274754CRETE EC ;4U
80/20
1.941.94
274887PILOT HIL;1U
80/20
0.8970.897
934111AD2-000 2
Adder
6.8035294117647065.783
274683WAUKEGAN ;8U
Adder
50.3941176470588342.835
961501AF2-441 C
80/20
14.87514.875
274826FISK ;BP
80/20
2.6552.655
939351AE1-166 C
Adder
11.6094117647058829.868
274675JOLIET 29;7U
Adder
82.4117647058823570.05
274674JOLIET 9 ;6U
Adder
42.3282352941176535.979
943121AE2-341 C
Adder
14.46117647058823512.292
946321AF1-296 C
Adder
4.0305882352941183.426
934101AD2-000 1
Adder
6.542352941176475.561
942421AE2-255 C
Adder
3.42117647058823552.908
926821AC1-168 C
Adder
1.28941176470588251.096
959611AF2-252 C
Adder
2.1329411764705881.813
939321AE1-163 C
Adder
6.7517647058823535.739
274752CRETE EC ;2U
80/20
1.941.94
274794SE CHICAG;1U
80/20
7.1437.143
936371AD2-047 C
80/20
5.355.35
936461AD2-060 C
80/20
3.1473.147
946671AF1-331 C
Adder
2.71058823529411752.304
960611AF2-352 C
Adder
2.1329411764705881.813
274800UNIV PARK;3U
80/20
1.3961.396
941551AE2-152 C
Adder
13.39529411764705811.386
274676JOLIET 29;8U
Adder
82.4152941176470670.053
958481AF2-142 C
Adder
12.7223529411764710.814
274790SE CHICAG;7U
80/20
7.2327.232
274791SE CHICAG;8U
80/20
7.2327.232
274789SE CHICAG;6U
80/20
7.2327.232
274682WAUKEGAN ;7U
Adder
46.7423529411764739.731
942651AE2-281 C
Adder
0.96470588235294120.82
962691AG1-118 C
Adder
25.1023529411764721.337
938851AE1-113 C
Adder
9.0329411764705887.678
959091AF2-200 C
Adder
16.12823529411764813.709
959341AF2-225 C
Adder
7.0364705882352945.981
965091AG1-374 C
Adder
19.1976470588235316.318
276164X3-005 C
80/20
0.0990.099
274827FISK ;RP
80/20
1.8821.882
957331AF2-027 C
Adder
2.82588235294117672.402
936511AD2-066 C
Adder
9.5376470588235298.107
939061AE1-134 2
Adder
1.54823529411764721.316
274792SE CHICAG;9U
80/20
7.1437.143
274799UNIV PARK;2U
80/20
1.3961.396
274801UNIV PARK;4U
80/20
1.3961.396
274751CRETE EC ;1U
80/20
1.941.94
274723RIVER EC ;12
80/20
5.1225.122
274724RIVER EC ;11
80/20
5.1235.123
960281AF2-319 C
Adder
2.89058823529411772.457
957471AF2-041 C
Adder
24.1929411764705920.564
938861AE1-114 C
Adder
4.4423529411764713.776
274888KELLY CRK;1U
80/20
0.8970.897
943591AF1-030 C
Adder
9.6164705882352938.174
957371AF2-031 C
80/20
1.5531.553
960591AF2-350 C
80/20
9.4429.442
960751AF2-366 C
Adder
7.9070588235294126.721
990552J1334 G
External Queue
40.5239410400390640.52394104003906
990557J1335 G
External Queue
40.5239410400390640.52394104003906
990562J1336 G
External Queue
40.5239410400390640.52394104003906
990577J1339
External Queue
26.57409286499023426.574092864990234
991247J1684 G
External Queue
33.61624908447265633.616249084472656
990647J1355
External Queue
42.268421173095742.2684211730957
955742J1058 G
External Queue
35.2828559875488335.28285598754883
990762J1386
External Queue
12.93081378936767612.930813789367676
990547J1333 G
External Queue
40.5239410400390640.52394104003906
990582J1340
External Queue
26.57409286499023426.574092864990234
990662J1358
External Queue
14.93047237396240214.930472373962402
991332J1785
External Queue
13.53217792510986313.532177925109863
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.2810.281
BlueGrassPJM->LTFIMP_BlueG
CLTF
1.4171.417
CBM West 1LTFEXP_CBM-W1->PJM
CBM
118.129118.129
WECLTFEXP_WEC->PJM
CLTF
4.4234.423
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.510.51
SIGELTFEXP_SIGE->PJM
CLTF
0.060.06
CBM West 2LTFEXP_CBM-W2->PJM
CBM
18.88718.887
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.5520.552
MECLTFEXP_MEC->PJM
CLTF
14.93414.934
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.8260.826
NYPJM->LTFIMP_NY
CLTF
1.271.27
TVALTFEXP_TVA->PJM
CLTF
1.7951.795
LAGNLTFEXP_LAGN->PJM
CLTF
4.3274.327

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:AEP/NIPS
Facility Description:
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:108.83 %
Rating:1075.0 MVA
Rating Type:A
MVA to Mitigate:1169.93
MW Contribution:11.24
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
274753CRETE EC ;3U
80/20
1.4551.455
274793SE CHICAG;0U
80/20
5.4655.465
274795SE CHICAG;2U
80/20
5.4655.465
962781AG1-127 C
Adder
4.4894117647058823.816
933911AD1-013 C
Adder
1.18705882352941171.009
274788SE CHICAG;5U
80/20
5.5385.538
274798UNIV PARK;1U
80/20
0.9230.923
958011AF2-095 C
80/20
8.6418.641
933411AC2-154 C
80/20
1.91.9
274687WILL CNTY;4U
Adder
48.5929411764705941.304
966091AG1-478 C
Adder
1.46941176470588241.249
966441AG1-513 C
Adder
0.32705882352941180.278
959081AF2-199 C
Adder
4.6141176470588243.922
942111AE2-223 C
Adder
1.2717647058823531.081
939741AE1-205 C
Adder
5.4776470588235294.656
959351AF2-226 C
Adder
1.80588235294117651.535
958491AF2-143 C
Adder
7.5847058823529416.447
965931AG1-462 C
Adder
10.5505882352941188.968
274754CRETE EC ;4U
80/20
1.4551.455
274887PILOT HIL;1U
80/20
0.570.57
934111AD2-000 2
Adder
4.077647058823533.466
274683WAUKEGAN ;8U
Adder
29.42352941176470825.01
946321AF1-296 C
Adder
2.34000000000000031.989
934101AD2-000 1
Adder
3.68941176470588243.136
942421AE2-255 C
Adder
2.0552941176470591.747
926821AC1-168 C
Adder
0.75294117647058820.64
959611AF2-252 C
Adder
1.24941176470588241.062
961501AF2-441 C
80/20
10.91610.916
274826FISK ;BP
80/20
1.7681.768
939351AE1-166 C
Adder
6.7717647058823545.756
274675JOLIET 29;7U
Adder
49.9447058823529542.453
274674JOLIET 9 ;6U
Adder
25.73058823529411821.871
943121AE2-341 C
Adder
7.99529411764705966.796
939321AE1-163 C
Adder
4.1294117647058823.51
274752CRETE EC ;2U
80/20
1.4551.455
274794SE CHICAG;1U
80/20
5.4655.465
936371AD2-047 C
80/20
3.43.4
936461AD2-060 C
80/20
22
946671AF1-331 C
Adder
1.54235294117647051.311
960611AF2-352 C
Adder
1.24941176470588241.062
274800UNIV PARK;3U
80/20
0.9170.917
941551AE2-152 C
Adder
7.8141176470588246.642
274676JOLIET 29;8U
Adder
49.9529411764705942.46
958481AF2-142 C
Adder
7.8258823529411776.652
274790SE CHICAG;7U
80/20
5.5385.538
274791SE CHICAG;8U
80/20
5.5385.538
274789SE CHICAG;6U
80/20
5.5385.538
274682WAUKEGAN ;7U
Adder
27.29294117647059223.199
942651AE2-281 C
Adder
0.58941176470588240.501
962691AG1-118 C
Adder
14.20823529411764812.077
938851AE1-113 C
Adder
5.4270588235294124.613
959091AF2-200 C
Adder
9.2294117647058827.845
959341AF2-225 C
Adder
4.1082352941176473.492
965091AG1-374 C
Adder
11.249.554
276164X3-005 C
80/20
0.070.07
274827FISK ;RP
80/20
1.2531.253
957331AF2-027 C
Adder
1.64941176470588241.402
936511AD2-066 C
Adder
5.6788235294117654.827
939061AE1-134 2
Adder
0.89294117647058820.759
274792SE CHICAG;9U
80/20
5.4655.465
274799UNIV PARK;2U
80/20
0.9170.917
274801UNIV PARK;4U
80/20
0.9170.917
274751CRETE EC ;1U
80/20
1.4551.455
274723RIVER EC ;12
80/20
3.8963.896
274724RIVER EC ;11
80/20
3.9023.902
960281AF2-319 C
Adder
1.80588235294117651.535
957471AF2-041 C
Adder
13.84352941176470611.767
938861AE1-114 C
Adder
2.562.176
274888KELLY CRK;1U
80/20
0.570.57
943591AF1-030 C
Adder
5.3176470588235294.52
957371AF2-031 C
80/20
1.1831.183
960591AF2-350 C
80/20
66
960751AF2-366 C
Adder
4.4776470588235293.806
990552J1334 G
External Queue
40.5459747314453140.54597473144531
990557J1335 G
External Queue
40.5459747314453140.54597473144531
990562J1336 G
External Queue
40.5459747314453140.54597473144531
990577J1339
External Queue
26.6973209381103526.69732093811035
991247J1684 G
External Queue
33.68902206420898433.689022064208984
990647J1355
External Queue
45.41125869750976645.411258697509766
955742J1058 G
External Queue
34.2569389343261734.25693893432617
990762J1386
External Queue
12.26621055603027312.266210556030273
990547J1333 G
External Queue
40.5459747314453140.54597473144531
990582J1340
External Queue
26.6973209381103526.69732093811035
990662J1358
External Queue
15.6888904571533215.68889045715332
991332J1785
External Queue
15.41609477996826215.416094779968262
991337J1802
External Queue
11.39966201782226611.399662017822266
CBM West 1LTFEXP_CBM-W1->PJM
CBM
75.73675.736
WECLTFEXP_WEC->PJM
CLTF
2.5782.578
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.2290.229
SIGELTFEXP_SIGE->PJM
CLTF
0.0530.053
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1480.148
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.6110.611
NYPJM->LTFIMP_NY
CLTF
0.7460.746
TVALTFEXP_TVA->PJM
CLTF
1.1741.174
LAGNLTFEXP_LAGN->PJM
CLTF
2.6762.676
CBM West 2LTFEXP_CBM-W2->PJM
CBM
11.85611.856
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.2990.299
MECLTFEXP_MEC->PJM
CLTF
8.7698.769
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.4540.454

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:CE/NIPS
Facility Description:
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#695_1681_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:100.5 %
Rating:1399.0 MVA
Rating Type:B
MVA to Mitigate:1405.95
MW Contribution:16.39
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
274753CRETE EC ;3U
80/20
6.1116.111
274654BRAIDWOOD;1U
80/20
27.62627.626
274731ELWOOD EC;2P
80/20
3.3583.358
274861TOP CROP ;1U
80/20
0.4420.442
962781AG1-127 C
Adder
7.1670588235294126.092
933911AD1-013 C
Adder
1.88470588235294121.602
958011AF2-095 C
Adder
10.2352941176470588.7
933411AC2-154 C
Adder
2.25058823529411761.913
274687WILL CNTY;4U
80/20
71.92771.927
966091AG1-478 C
Adder
2.00941176470588221.708
274733ELWOOD EC;3P
80/20
3.3583.358
966441AG1-513 C
Adder
0.52117647058823540.443
959081AF2-199 C
Adder
7.3070588235294126.211
942111AE2-223 C
Adder
1.86941176470588231.589
939741AE1-205 C
Adder
8.0529411764705886.845
274655BRAIDWOOD;2U
80/20
26.8826.88
276640AC1-204 GEN1
80/20
12.4912.49
959351AF2-226 C
80/20
2.9462.946
958491AF2-143 C
Adder
10.89.18
965931AG1-462 C
Adder
16.29411764705882213.85
274754CRETE EC ;4U
80/20
6.1116.111
934111AD2-000 2
80/20
6.316.31
274683WAUKEGAN ;8U
Adder
45.9152941176470639.028
274661LASCO STA;2U
80/20
25.57725.577
276658AB1-122 CT1
80/20
11.86311.863
946321AF1-296 C
Adder
3.6188235294117653.076
274711KENDALL ;4S
80/20
2.5942.594
934101AD2-000 1
80/20
5.8925.892
942421AE2-255 C
Adder
3.14941176470588242.677
926821AC1-168 C
Adder
1.16117647058823530.987
959611AF2-252 C
Adder
1.82117647058823541.548
961501AF2-441 C
Adder
6.6670588235294125.667
939351AE1-166 C
80/20
10.22310.223
274675JOLIET 29;7U
80/20
76.19176.191
274674JOLIET 9 ;6U
Adder
35.31176470588235430.015
943121AE2-341 C
Adder
13.0411.084
274862TOP CROP ;2U
80/20
0.8420.842
939321AE1-163 C
Adder
5.8800000000000014.998
274752CRETE EC ;2U
80/20
6.1116.111
936371AD2-047 C
Adder
4.0282352941176473.424
936461AD2-060 C
Adder
2.3694117647058822.014
274732ELWOOD EC;7P
80/20
3.3643.364
274730ELWOOD EC;6P
80/20
3.3643.364
276660AB1-122 CT2
80/20
12.70612.706
274739AURORA EC;2P
80/20
3.5563.556
946671AF1-331 C
Adder
2.4482352941176472.081
960611AF2-352 C
Adder
1.82117647058823541.548
941551AE2-152 C
80/20
11.79611.796
274676JOLIET 29;8U
80/20
76.23476.234
937401AD2-194 1
80/20
1.3081.308
274704KENDALL ;1C
80/20
4.1394.139
274706KENDALL ;2C
80/20
4.1394.139
274705KENDALL ;1S
80/20
2.7682.768
274847GR RIDGE ;BU
80/20
0.5960.596
958481AF2-142 C
Adder
10.8682352941176469.238
274708KENDALL ;3C
80/20
3.9223.922
274734ELWOOD EC;8P
80/20
3.3643.364
274736ELWOOD EC;9P
80/20
3.3643.364
274735ELWOOD EC;4P
80/20
3.3583.358
274682WAUKEGAN ;7U
Adder
42.636.21
942651AE2-281 C
Adder
0.840.714
962691AG1-118 C
Adder
22.6929411764705919.289
938851AE1-113 C
Adder
8.3141176470588247.067
959091AF2-200 C
Adder
14.61529411764705912.423
959341AF2-225 C
Adder
6.0400000000000015.134
965091AG1-374 C
Adder
16.39058823529411813.932
274710KENDALL ;4C
80/20
3.8793.879
274709KENDALL ;3S
80/20
2.5942.594
276642AC1-204 GEN2
80/20
12.51212.512
274707KENDALL ;2S
80/20
2.7682.768
274871GR RIDGE ;2U
80/20
0.2220.222
957331AF2-027 C
Adder
2.5729411764705882.187
936511AD2-066 C
Adder
8.5141176470588237.237
939061AE1-134 2
Adder
1.39647058823529411.187
937411AD2-194 2
80/20
1.3111.311
274737AURORA EC;1P
80/20
3.5563.556
274751CRETE EC ;1U
80/20
6.1116.111
274729ELWOOD EC;1P
80/20
3.3583.358
960281AF2-319 C
80/20
2.9462.946
957471AF2-041 C
Adder
21.9223529411764718.634
938861AE1-114 C
Adder
4.0129411764705883.411
274660LASCO STA;1U
80/20
25.49425.494
943591AF1-030 C
Adder
8.6717647058823537.371
960591AF2-350 C
Adder
7.1082352941176476.042
934721AD1-100 C
80/20
3.0093.009
274728ELWOOD EC;5P
80/20
3.3643.364
274745AURORA EC;9P
80/20
1.0831.083
960751AF2-366 C
Adder
7.1470588235294126.075
274658DRESDEN ;2U
80/20
19.99619.996
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.3070.307
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.0682.068
CBM West 1LTFEXP_CBM-W1->PJM
CBM
80.25680.256
WECLTFEXP_WEC->PJM
CLTF
4.0134.013
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.7050.705
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.8350.835
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.40713.407
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.5760.576
MECLTFEXP_MEC->PJM
CLTF
13.15513.155
NYPJM->LTFIMP_NY
CLTF
1.1511.151
TVALTFEXP_TVA->PJM
CLTF
1.1071.107
LAGNLTFEXP_LAGN->PJM
CLTF
3.2763.276

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:CE/NIPS
Facility Description:
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
Contingency Name:
765-L11215__-S_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:100.5 %
Rating:1399.0 MVA
Rating Type:B
MVA to Mitigate:1405.93
MW Contribution:16.39
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
274753CRETE EC ;3U
80/20
6.1116.111
274654BRAIDWOOD;1U
80/20
27.62627.626
274731ELWOOD EC;2P
80/20
3.3583.358
274861TOP CROP ;1U
80/20
0.4420.442
962781AG1-127 C
Adder
7.1670588235294126.092
933911AD1-013 C
Adder
1.88470588235294121.602
958011AF2-095 C
Adder
10.2352941176470588.7
933411AC2-154 C
Adder
2.25058823529411761.913
274687WILL CNTY;4U
80/20
71.92771.927
966091AG1-478 C
Adder
2.00941176470588221.708
274733ELWOOD EC;3P
80/20
3.3583.358
966441AG1-513 C
Adder
0.52117647058823540.443
959081AF2-199 C
Adder
7.3070588235294126.211
942111AE2-223 C
Adder
1.86941176470588231.589
939741AE1-205 C
Adder
8.0529411764705886.845
274655BRAIDWOOD;2U
80/20
26.8826.88
276640AC1-204 GEN1
80/20
12.4912.49
959351AF2-226 C
80/20
2.9462.946
958491AF2-143 C
Adder
10.89.18
965931AG1-462 C
Adder
16.29411764705882213.85
274754CRETE EC ;4U
80/20
6.1116.111
934111AD2-000 2
80/20
6.316.31
274683WAUKEGAN ;8U
Adder
45.9152941176470639.028
274661LASCO STA;2U
80/20
25.57725.577
276658AB1-122 CT1
80/20
11.86311.863
946321AF1-296 C
Adder
3.6188235294117653.076
274711KENDALL ;4S
80/20
2.5942.594
934101AD2-000 1
80/20
5.8925.892
942421AE2-255 C
Adder
3.14941176470588242.677
926821AC1-168 C
Adder
1.16117647058823530.987
959611AF2-252 C
Adder
1.82117647058823541.548
961501AF2-441 C
Adder
6.6670588235294125.667
939351AE1-166 C
80/20
10.22310.223
274675JOLIET 29;7U
80/20
76.19176.191
274674JOLIET 9 ;6U
Adder
35.31176470588235430.015
943121AE2-341 C
Adder
13.0411.084
274862TOP CROP ;2U
80/20
0.8420.842
939321AE1-163 C
Adder
5.8800000000000014.998
274752CRETE EC ;2U
80/20
6.1116.111
936371AD2-047 C
Adder
4.0282352941176473.424
936461AD2-060 C
Adder
2.3694117647058822.014
274732ELWOOD EC;7P
80/20
3.3643.364
274730ELWOOD EC;6P
80/20
3.3643.364
276660AB1-122 CT2
80/20
12.70612.706
274739AURORA EC;2P
80/20
3.5563.556
946671AF1-331 C
Adder
2.4482352941176472.081
960611AF2-352 C
Adder
1.82117647058823541.548
941551AE2-152 C
80/20
11.79611.796
274676JOLIET 29;8U
80/20
76.23476.234
937401AD2-194 1
80/20
1.3081.308
274704KENDALL ;1C
80/20
4.1394.139
274706KENDALL ;2C
80/20
4.1394.139
274705KENDALL ;1S
80/20
2.7682.768
274847GR RIDGE ;BU
80/20
0.5960.596
958481AF2-142 C
Adder
10.8682352941176469.238
274708KENDALL ;3C
80/20
3.9223.922
274734ELWOOD EC;8P
80/20
3.3643.364
274736ELWOOD EC;9P
80/20
3.3643.364
274735ELWOOD EC;4P
80/20
3.3583.358
274682WAUKEGAN ;7U
Adder
42.636.21
942651AE2-281 C
Adder
0.840.714
962691AG1-118 C
Adder
22.6929411764705919.289
938851AE1-113 C
Adder
8.3141176470588247.067
959091AF2-200 C
Adder
14.61529411764705912.423
959341AF2-225 C
Adder
6.0400000000000015.134
965091AG1-374 C
Adder
16.39058823529411813.932
274710KENDALL ;4C
80/20
3.8793.879
274709KENDALL ;3S
80/20
2.5942.594
276642AC1-204 GEN2
80/20
12.51212.512
274707KENDALL ;2S
80/20
2.7682.768
274871GR RIDGE ;2U
80/20
0.2220.222
957331AF2-027 C
Adder
2.5729411764705882.187
936511AD2-066 C
Adder
8.5141176470588237.237
939061AE1-134 2
Adder
1.39647058823529411.187
937411AD2-194 2
80/20
1.3111.311
274737AURORA EC;1P
80/20
3.5563.556
274751CRETE EC ;1U
80/20
6.1116.111
274729ELWOOD EC;1P
80/20
3.3583.358
960281AF2-319 C
80/20
2.9462.946
957471AF2-041 C
Adder
21.9223529411764718.634
938861AE1-114 C
Adder
4.0129411764705883.411
274660LASCO STA;1U
80/20
25.49425.494
943591AF1-030 C
Adder
8.6717647058823537.371
960591AF2-350 C
Adder
7.1082352941176476.042
934721AD1-100 C
80/20
3.0093.009
274728ELWOOD EC;5P
80/20
3.3643.364
274745AURORA EC;9P
80/20
1.0831.083
960751AF2-366 C
Adder
7.1470588235294126.075
274658DRESDEN ;2U
80/20
19.99619.996
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.40713.407
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.5760.576
MECLTFEXP_MEC->PJM
CLTF
13.15513.155
NYPJM->LTFIMP_NY
CLTF
1.1511.151
TVALTFEXP_TVA->PJM
CLTF
1.1071.107
LAGNLTFEXP_LAGN->PJM
CLTF
3.2763.276
CBM West 1LTFEXP_CBM-W1->PJM
CBM
80.25680.256
WECLTFEXP_WEC->PJM
CLTF
4.0134.013
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.7050.705
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.8350.835
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.3070.307
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.0682.068

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_112-45-BT4-5___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:CE
Facility Description:
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_112-45-BT4-5___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.41 %
Rating:2297.0 MVA
Rating Type:STE
MVA to Mitigate:2306.47
MW Contribution:23.01
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
274731ELWOOD EC;2P
50/50
4.6474.647
274861TOP CROP ;1U
50/50
1.0691.069
276591L-013 2
Adder
3.00235294117647072.552
962781AG1-127 C
Adder
5.5211764705882354.693
933911AD1-013 C
Adder
1.50588235294117641.28
966441AG1-513 C
Adder
0.396470588235294130.337
959081AF2-199 C
Adder
6.2741176470588245.333
276640AC1-204 GEN1
50/50
17.28517.285
959351AF2-226 C
50/50
7.1367.136
958491AF2-143 C
Adder
8.4411764705882367.175
933912AD1-013 E
Adder
2.40470588235294122.044
946152AF1-280 E
Adder
20.51882352941176517.441
293771O-035 E
Adder
6.177647058823535.251
293716O-029 E
Adder
4.8658823529411774.136
939742AE1-205 E
Adder
9.247.854
965931AG1-462 C
Adder
15.10352941176470612.838
934111AD2-000 2
Adder
8.1694117647058836.944
966442AG1-513 E
Adder
0.59411764705882350.505
274683WAUKEGAN ;8U
Adder
41.79647058823529435.527
290051GSG-6; E
Adder
8.5729411764705887.287
959082AF2-199 E
Adder
3.13764705882352952.667
958912AF2-182 E
Adder
30.77764705882353326.161
294401BSHIL;1U E
Adder
8.0376470588235296.832
942112AE2-223 E
Adder
10.3941176470588268.835
959612AF2-252 E
Adder
2.30117647058823541.956
916212CRESCENT ;1U
Adder
4.343.689
294410BSHIL;2U E
Adder
8.0376470588235296.832
917502Z2-087 E
Adder
13.85882352941176311.78
942111AE2-223 C
Adder
1.55294117647058831.32
939741AE1-205 C
Adder
6.6905882352941185.687
960612AF2-352 E
Adder
2.30117647058823541.956
966822AG1-553 E
Adder
25.66705882352941321.817
943122AE2-341 E
Adder
4.0811764705882353.469
939322AE1-163 E
Adder
28.22941176470588323.995
927208AC1-214 E1
Adder
2.92941176470588262.49
293516O-009 E
Adder
17.15882352941176614.585
293717O-029 E
Adder
4.4717647058823533.801
946321AF1-296 C
Adder
3.32000000000000032.822
959352AF2-226 E
50/50
10.70410.704
934101AD2-000 1
Adder
5.8152941176470594.943
958492AF2-143 E
Adder
5.6270588235294134.783
942421AE2-255 C
Adder
4.0847058823529413.472
290108LEEDK;1U E
Adder
19.07882352941176416.217
916221Z1-073 E
Adder
6.0411764705882355.135
957472AF2-041 E
Adder
9.4117647058823538
959092AF2-200 E
Adder
8.3658823529411767.111
926821AC1-168 C
Adder
0.8317647058823530.707
938862AE1-114 E
Adder
11.94117647058823610.15
959611AF2-252 C
Adder
1.53411764705882361.304
274675JOLIET 29;7U
Adder
91.0294117647058877.375
943121AE2-341 C
Adder
8.3105882352941187.064
274862TOP CROP ;2U
50/50
2.0392.039
939321AE1-163 C
Adder
4.5952941176470593.906
295111SUBLETTE E
Adder
2.2317647058823531.897
274860EASYR;U2 E
Adder
10.7905882352941189.172
927209AC1-214 E2
Adder
2.92941176470588262.49
946322AF1-296 E
Adder
15.54588235294117713.214
274732ELWOOD EC;7P
50/50
4.7054.705
274730ELWOOD EC;6P
50/50
4.7054.705
962782AG1-127 E
Adder
3.67411764705882373.123
946671AF1-331 C
Adder
1.95529411764705881.662
960611AF2-352 C
Adder
1.53411764705882361.304
274676JOLIET 29;8U
Adder
91.5117647058823677.785
937401AD2-194 1
50/50
1.8111.811
274704KENDALL ;1C
50/50
5.9235.923
274706KENDALL ;2C
50/50
5.9235.923
274705KENDALL ;1S
50/50
3.9613.961
957332AF2-027 E
Adder
3.50235294117647072.977
926822AC1-168 E
Adder
5.5847058823529414.747
274734ELWOOD EC;8P
50/50
4.7054.705
274736ELWOOD EC;9P
50/50
4.7054.705
274735ELWOOD EC;4P
50/50
4.6474.647
274682WAUKEGAN ;7U
Adder
38.8423529411764733.016
942651AE2-281 C
Adder
0.65647058823529430.558
942652AE2-281 E
Adder
4.03294117647058853.428
962691AG1-118 C
Adder
17.414.79
962692AG1-118 E
Adder
11.69.86
938851AE1-113 C
Adder
10.7835294117647079.166
272363ESS H440 ; R
Adder
2.1517647058823531.829
959091AF2-200 C
Adder
12.54823529411764810.666
940502AE2-035 E
Adder
3.01647058823529422.564
924048AB2-047 E1
Adder
8.5941176470588237.305
959341AF2-225 C
Adder
5.0176470588235294.265
965092AG1-374 E
Adder
9.2023529411764717.822
965091AG1-374 C
Adder
13.80470588235294111.734
965932AG1-462 E
Adder
10.0694117647058818.559
276642AC1-204 GEN2
50/50
17.50217.502
274707KENDALL ;2S
50/50
3.9613.961
957331AF2-027 C
Adder
2.3352941176470591.985
936511AD2-066 C
Adder
7.3411764705882366.24
936512AD2-066 E
Adder
4.8941176470588244.16
295109WESTBROOK E
Adder
4.5905882352941183.902
939061AE1-134 2
Adder
1.24117647058823531.055
990901L-005 E
Adder
12.28823529411764810.445
290261S-027 E
Adder
12.5152941176470610.638
290265S-028 E
Adder
12.43882352941176510.573
937411AD2-194 2
50/50
1.8341.834
938852AE1-113 E
Adder
38.2329411764705932.498
962012AG1-044 E
Adder
0.056470588235294120.048
925582AC1-033 E
Adder
8.8105882352941187.489
924049AB2-047 E2
Adder
8.7294117647058837.42
959342AF2-225 E
Adder
6.9294117647058825.89
274729ELWOOD EC;1P
50/50
4.6474.647
293644O22 E1
50/50
40.99540.995
960281AF2-319 C
50/50
7.1367.136
960752AF2-366 E
Adder
3.6705882352941183.12
957471AF2-041 C
Adder
18.82352941176470716
294763P-046 E
Adder
8.3823529411764717.125
938861AE1-114 C
Adder
3.52.975
943592AF1-030 E
Adder
2.73411764705882332.324
943591AF1-030 C
Adder
5.5270588235294124.698
936292AD2-038 E
Adder
11.5917647058823539.853
290021O50 E
Adder
26.14235294117647322.221
937002AD2-134 E
Adder
8.2894117647058827.046
274728ELWOOD EC;5P
50/50
4.7054.705
960751AF2-366 C
Adder
5.50588235294117644.68
942422AE2-255 E
Adder
12.25411764705882510.416
960582AF2-349 E
Adder
32.12588235294117627.307
937312AD2-172 E
Adder
3.01647058823529422.564
274859EASYR;U1 E
Adder
10.7905882352941189.172
293645O22 E2
50/50
46.95446.954
960282AF2-319 E
50/50
10.70410.704
293715O-029 E
Adder
8.8741176470588247.543
276170Z1-108 E
Adder
2.58588235294117652.198
276626AG1-044 E
Adder
0.067058823529411770.057
920272AA2-123 E
Adder
2.53411764705882362.154
990552J1334 G
External Queue
-25.95514488220215-25.95514488220215
990557J1335 G
External Queue
-25.95514488220215-25.95514488220215
990562J1336 G
External Queue
-25.95514488220215-25.95514488220215
990577J1339
External Queue
-28.660625457763672-28.660625457763672
990647J1355
External Queue
-11.565272331237793-11.565272331237793
990497J1323
External Queue
-1.8008151054382324-1.8008151054382324
990547J1333 G
External Queue
-25.95514488220215-25.95514488220215
990582J1340
External Queue
-28.660625457763672-28.660625457763672
990662J1358
External Queue
-13.962589263916016-13.962589263916016
991182J1586 G
External Queue
-35.323299407958984-35.323299407958984
CBM West 1LTFEXP_CBM-W1->PJM
CBM
76.48876.488
NYPJM->LTFIMP_NY
CLTF
0.7040.704
TVALTFEXP_TVA->PJM
CLTF
1.831.83
LAGNLTFEXP_LAGN->PJM
CLTF
3.9933.993
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.1710.171
MECLTFEXP_MEC->PJM
CLTF
12.68312.683
O66PJM->LTFIMP_O-066
CMTX_NF
8.3278.327
G-007PJM->LTFIMP_G-007
CMTX_NF
1.2971.297
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0650.065
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.8420.842
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.2990.299
CBM West 2LTFEXP_CBM-W2->PJM
CBM
15.95815.958
WECLTFEXP_WEC->PJM
CLTF
3.6463.646
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.3060.306
SIGELTFEXP_SIGE->PJM
CLTF
0.0390.039

Details for LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o COMED_P4_012-45-BT12-14_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:CE
Facility Description:
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_012-45-BT12-14_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:130.94 %
Rating:2107.0 MVA
Rating Type:STE
MVA to Mitigate:2758.84
MW Contribution:124.66
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
270681BRIGHTSTK; R
50/50
1.8921.892
925772AC1-053 E
50/50
46.7246.72
917502Z2-087 E
50/50
77.77477.774
942111AE2-223 C
50/50
8.7168.716
939741AE1-205 C
50/50
37.54637.546
274854TWINGROVE;U2
50/50
2.4232.423
960612AF2-352 E
50/50
12.46612.466
274880RADFORD R;1U
50/50
2.1692.169
274650KINCAID ;1U
50/50
18.79818.798
939742AE1-205 E
50/50
51.84951.849
935141AD1-148 C
50/50
1.4641.464
957382AF2-032 E
50/50
1.3291.329
965911AG1-460 C
50/50
2.4622.462
276656AB2-047 C2
50/50
1.1831.183
942112AE2-223 E
50/50
58.3358.33
959612AF2-252 E
50/50
12.46612.466
274853TWINGROVE;U1
50/50
2.3552.355
276668AB2-070 C
50/50
1.1751.175
274863CAYUGA RI;1U
50/50
2.282.28
960261AF2-317 C
50/50
0.6160.616
942481AE2-261 C
50/50
36.81436.814
959611AF2-252 C
50/50
8.3118.311
924266AB2-070 E
50/50
43.6943.69
957381AF2-032 C
50/50
2.8242.824
965912AG1-460 E
50/50
3.6943.694
936971AD2-131 C
50/50
1.6491.649
925771AC1-053 C
50/50
1.1181.118
942482AE2-261 E
50/50
24.54324.543
936972AD2-131 E
50/50
8.2838.283
960611AF2-352 C
50/50
8.3118.311
274651KINCAID ;2U
50/50
18.79318.793
274891CAYUG;2U E
50/50
74.65174.651
276655AB2-047 C1
50/50
1.1831.183
924048AB2-047 E1
50/50
48.22948.229
959341AF2-225 C
50/50
28.15928.159
965092AG1-374 E
50/50
49.86549.865
965091AG1-374 C
50/50
74.79774.797
960141AF2-305_AG1-
50/50
2.5532.553
936772AD2-100 E
50/50
16.68616.686
274864CAYUGA RI;2U
50/50
2.282.28
290261S-027 E
50/50
67.81667.816
290265S-028 E
50/50
67.40167.401
936771AD2-100 C
50/50
25.02825.028
274890CAYUG;1U E
50/50
74.65174.651
924049AB2-047 E2
50/50
48.98848.988
959342AF2-225 E
50/50
38.88738.887
944222AF1-090 E
50/50
29.56329.563
276174W4-005 E
50/50
76.07176.071
965331AG1-398 C
50/50
0.3190.319
276615W2-048 GEN
50/50
13.48613.486
276621X2-022 GEN
50/50
46.15946.159
944221AF1-090 C
50/50
6.3156.315
991267J1714
External Queue
10.46212959289550810.462129592895508
991278J1725 C
External Queue
1.57691919803619381.5769191980361938
991279J1725 E
External Queue
8.5315370559692388.531537055969238
992572J1022
External Queue
30.9326515197753930.93265151977539
954822J955
External Queue
185.20120239257812185.20120239257812
991037J1464 G
External Queue
89.2741317749023489.27413177490234
956452J1139
External Queue
17.96219444274902317.962194442749023
990353J1289 C
External Queue
3.84124183654785163.8412418365478516
956282J1115 C
External Queue
7.6581282615661627.658128261566162
990672J1360
External Queue
58.19924163818359458.199241638183594
956283J1115 E
External Queue
41.43243789672851641.432437896728516
991192J1610 G
External Queue
16.27075004577636716.270750045776367
990354J1289 E
External Queue
20.78210258483886720.782102584838867
990057J1201
External Queue
5.1005334854125985.100533485412598
991197J1626
External Queue
15.69319438934326215.693194389343262
991217J1653
External Queue
15.16268444061279315.162684440612793
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.9770.977
G-007ALTFEXP_G-007A->PJM
CMTX
1.9011.901
TVALTFEXP_TVA->PJM
CLTF
5.2445.244
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.8120.812
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.561.56
LAGNLTFEXP_LAGN->PJM
CLTF
6.8336.833
CBM South 2LTFEXP_CBM-S2->PJM
CBM
21.10821.108
CPLELTFEXP_CPLE->PJM
CLTF
1.691.69
SIGELTFEXP_SIGE->PJM
CLTF
0.4550.455
CBM West 2LTFEXP_CBM-W2->PJM
CBM
36.07136.071
VTFLTFEXP_VFT->PJM
CMTX
5.1065.106
MECLTFEXP_MEC->PJM
CLTF
2.8282.828

Details for LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o COMED_P4_012-45-BT14-15_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:CE
Facility Description:
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_012-45-BT14-15_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:127.29 %
Rating:2107.0 MVA
Rating Type:STE
MVA to Mitigate:2682.0
MW Contribution:124.27
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
270681BRIGHTSTK; R
50/50
1.8881.888
925772AC1-053 E
50/50
46.30646.306
917502Z2-087 E
50/50
77.58377.583
942111AE2-223 C
50/50
8.6958.695
939741AE1-205 C
50/50
37.45437.454
274854TWINGROVE;U2
50/50
2.4152.415
960612AF2-352 E
50/50
12.42712.427
274880RADFORD R;1U
50/50
2.1542.154
274650KINCAID ;1U
50/50
18.5518.55
939742AE1-205 E
50/50
51.72251.722
935141AD1-148 C
50/50
1.4491.449
957382AF2-032 E
50/50
1.3111.311
965911AG1-460 C
50/50
2.432.43
276656AB2-047 C2
50/50
1.181.18
942112AE2-223 E
50/50
58.18758.187
959612AF2-252 E
50/50
12.42712.427
274853TWINGROVE;U1
50/50
2.3482.348
276668AB2-070 C
50/50
1.1651.165
274863CAYUGA RI;1U
50/50
2.282.28
960261AF2-317 C
50/50
0.610.61
942481AE2-261 C
50/50
36.32636.326
959611AF2-252 C
50/50
8.2858.285
924266AB2-070 E
50/50
43.32743.327
957381AF2-032 C
50/50
2.7862.786
965912AG1-460 E
50/50
3.6453.645
936971AD2-131 C
50/50
1.6271.627
925771AC1-053 C
50/50
1.1081.108
942482AE2-261 E
50/50
24.21724.217
936972AD2-131 E
50/50
8.1738.173
960611AF2-352 C
50/50
8.2858.285
274651KINCAID ;2U
50/50
18.54418.544
274891CAYUG;2U E
50/50
74.65874.658
276655AB2-047 C1
50/50
1.181.18
924048AB2-047 E1
50/50
48.1148.11
959341AF2-225 C
50/50
28.0928.09
965092AG1-374 E
50/50
49.7149.71
965091AG1-374 C
50/50
74.56474.564
960141AF2-305_AG1-
50/50
2.5312.531
936772AD2-100 E
50/50
16.46316.463
274864CAYUGA RI;2U
50/50
2.282.28
290261S-027 E
50/50
67.60567.605
290265S-028 E
50/50
67.19167.191
936771AD2-100 C
50/50
24.69424.694
274890CAYUG;1U E
50/50
74.65874.658
924049AB2-047 E2
50/50
48.86848.868
959342AF2-225 E
50/50
38.79138.791
944222AF1-090 E
50/50
29.15729.157
276174W4-005 E
50/50
75.52575.525
965331AG1-398 C
50/50
0.3160.316
276615W2-048 GEN
50/50
13.34913.349
276621X2-022 GEN
50/50
45.68945.689
944221AF1-090 C
50/50
6.2286.228
991267J1714
External Queue
10.35616111755371110.356161117553711
991278J1725 C
External Queue
1.4686489105224611.468648910522461
991279J1725 E
External Queue
7.9457669258117687.945766925811768
992572J1022
External Queue
30.7744674682617230.77446746826172
954822J955
External Queue
182.9213104248047182.9213104248047
991037J1464 G
External Queue
87.473609924316487.4736099243164
956452J1139
External Queue
17.89773559570312517.897735595703125
990353J1289 C
External Queue
3.7201089859008793.720108985900879
956282J1115 C
External Queue
7.6140823364257817.614082336425781
990672J1360
External Queue
57.91726684570312557.917266845703125
956283J1115 E
External Queue
41.1941375732421941.19413757324219
991192J1610 G
External Queue
15.96568870544433615.965688705444336
990354J1289 E
External Queue
20.1267433166503920.12674331665039
990057J1201
External Queue
5.0432085990905765.043208599090576
991197J1626
External Queue
15.53424167633056615.534241676330566
991217J1653
External Queue
14.12162399291992214.121623992919922
CBM South 2LTFEXP_CBM-S2->PJM
CBM
20.85920.859
CPLELTFEXP_CPLE->PJM
CLTF
1.6751.675
SIGELTFEXP_SIGE->PJM
CLTF
0.450.45
CBM West 2LTFEXP_CBM-W2->PJM
CBM
35.24435.244
VTFLTFEXP_VFT->PJM
CMTX
5.1995.199
MECLTFEXP_MEC->PJM
CLTF
2.4732.473
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.5511.551
LAGNLTFEXP_LAGN->PJM
CLTF
6.6476.647
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.9970.997
G-007ALTFEXP_G-007A->PJM
CMTX
1.9361.936
TVALTFEXP_TVA->PJM
CLTF
5.1355.135
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.8050.805

Details for PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line l/o COMED_P4_012-45-BT12-14_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:CE
Facility Description:
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_012-45-BT12-14_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:139.84 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:2568.92
MW Contribution:124.73
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
270681BRIGHTSTK; R
50/50
1.8931.893
925772AC1-053 E
50/50
46.76146.761
966091AG1-478 C
Adder
-1.4364705882352942-1.221
917502Z2-087 E
50/50
77.81477.814
942111AE2-223 C
50/50
8.7218.721
939741AE1-205 C
50/50
37.56637.566
274854TWINGROVE;U2
50/50
2.4242.424
960612AF2-352 E
50/50
12.47312.473
274880RADFORD R;1U
50/50
2.1712.171
274650KINCAID ;1U
50/50
18.8218.82
939742AE1-205 E
50/50
51.87651.876
935141AD1-148 C
50/50
1.4651.465
957382AF2-032 E
50/50
1.331.33
965911AG1-460 C
50/50
2.4652.465
276656AB2-047 C2
50/50
1.1831.183
942112AE2-223 E
50/50
58.36158.361
959612AF2-252 E
50/50
12.47312.473
274853TWINGROVE;U1
50/50
2.3562.356
276668AB2-070 C
50/50
1.1761.176
960261AF2-317 C
50/50
0.6160.616
942481AE2-261 C
50/50
36.85636.856
959611AF2-252 C
50/50
8.3158.315
924266AB2-070 E
50/50
43.72743.727
957381AF2-032 C
50/50
2.8272.827
965912AG1-460 E
50/50
3.6983.698
936971AD2-131 C
50/50
1.6511.651
925771AC1-053 C
50/50
1.1191.119
942482AE2-261 E
50/50
24.57124.571
936972AD2-131 E
50/50
8.2938.293
960611AF2-352 C
50/50
8.3158.315
274651KINCAID ;2U
50/50
18.81418.814
276655AB2-047 C1
50/50
1.1831.183
924048AB2-047 E1
50/50
48.25448.254
959341AF2-225 C
50/50
28.17428.174
965092AG1-374 E
50/50
49.89349.893
965091AG1-374 C
50/50
74.83974.839
960141AF2-305_AG1-
50/50
2.5552.555
936772AD2-100 E
50/50
16.70516.705
290261S-027 E
50/50
67.85467.854
290265S-028 E
50/50
67.43967.439
936771AD2-100 C
50/50
25.05825.058
924049AB2-047 E2
50/50
49.01449.014
959342AF2-225 E
50/50
38.90738.907
944222AF1-090 E
50/50
29.60229.602
276174W4-005 E
50/50
76.13276.132
965331AG1-398 C
50/50
0.3190.319
276615W2-048 GEN
50/50
13.49913.499
276621X2-022 GEN
50/50
46.20246.202
944221AF1-090 C
50/50
6.3236.323
991267J1714
External Queue
10.46212959289550810.462129592895508
991278J1725 C
External Queue
1.57691919803619381.5769191980361938
991279J1725 E
External Queue
8.5315370559692388.531537055969238
992572J1022
External Queue
30.9326515197753930.93265151977539
954822J955
External Queue
185.20120239257812185.20120239257812
991037J1464 G
External Queue
89.2741317749023489.27413177490234
956452J1139
External Queue
17.96219444274902317.962194442749023
990353J1289 C
External Queue
3.84124183654785163.8412418365478516
956282J1115 C
External Queue
7.6581282615661627.658128261566162
990672J1360
External Queue
58.19924163818359458.199241638183594
956283J1115 E
External Queue
41.43243789672851641.432437896728516
991192J1610 G
External Queue
16.27075004577636716.270750045776367
990354J1289 E
External Queue
20.78210258483886720.782102584838867
990057J1201
External Queue
5.1005334854125985.100533485412598
991197J1626
External Queue
15.69319438934326215.693194389343262
991217J1653
External Queue
15.16268444061279315.162684440612793
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.5741.574
LAGNLTFEXP_LAGN->PJM
CLTF
6.8746.874
CBM NorthLTFEXP_CBM-N->PJM
CBM
1.0081.008
G-007ALTFEXP_G-007A->PJM
CMTX
1.9581.958
TVALTFEXP_TVA->PJM
CLTF
5.2775.277
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.8230.823
CBM West 2LTFEXP_CBM-W2->PJM
CBM
36.22536.225
VTFLTFEXP_VFT->PJM
CMTX
5.2585.258
MECLTFEXP_MEC->PJM
CLTF
2.8662.866
CBM South 2LTFEXP_CBM-S2->PJM
CBM
21.34821.348
CPLELTFEXP_CPLE->PJM
CLTF
1.7121.712
SIGELTFEXP_SIGE->PJM
CLTF
0.4580.458

Details for PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line l/o COMED_P4_012-45-BT14-15_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:CE
Facility Description:
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_012-45-BT14-15_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:135.76 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:2493.84
MW Contribution:124.34
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
270681BRIGHTSTK; R
50/50
1.8891.889
925772AC1-053 E
50/50
46.34746.347
917502Z2-087 E
50/50
77.62377.623
942111AE2-223 C
50/50
8.6998.699
939741AE1-205 C
50/50
37.47337.473
274854TWINGROVE;U2
50/50
2.4162.416
960612AF2-352 E
50/50
12.43412.434
274880RADFORD R;1U
50/50
2.1562.156
274650KINCAID ;1U
50/50
18.57118.571
939742AE1-205 E
50/50
51.74951.749
935141AD1-148 C
50/50
1.4511.451
957382AF2-032 E
50/50
1.3131.313
965911AG1-460 C
50/50
2.4332.433
276656AB2-047 C2
50/50
1.181.18
942112AE2-223 E
50/50
58.21858.218
959612AF2-252 E
50/50
12.43412.434
274853TWINGROVE;U1
50/50
2.3492.349
276668AB2-070 C
50/50
1.1661.166
960261AF2-317 C
50/50
0.610.61
942481AE2-261 C
50/50
36.36836.368
959611AF2-252 C
50/50
8.298.29
924266AB2-070 E
50/50
43.36443.364
957381AF2-032 C
50/50
2.792.79
965912AG1-460 E
50/50
3.6493.649
936971AD2-131 C
50/50
1.6291.629
925771AC1-053 C
50/50
1.1091.109
942482AE2-261 E
50/50
24.24624.246
936972AD2-131 E
50/50
8.1828.182
960611AF2-352 C
50/50
8.298.29
274651KINCAID ;2U
50/50
18.56518.565
276655AB2-047 C1
50/50
1.181.18
924048AB2-047 E1
50/50
48.13548.135
959341AF2-225 C
50/50
28.10528.105
965092AG1-374 E
50/50
49.73849.738
965091AG1-374 C
50/50
74.60774.607
960141AF2-305_AG1-
50/50
2.5342.534
936772AD2-100 E
50/50
16.48216.482
290261S-027 E
50/50
67.64367.643
290265S-028 E
50/50
67.22967.229
936771AD2-100 C
50/50
24.72324.723
924049AB2-047 E2
50/50
48.89448.894
959342AF2-225 E
50/50
38.81238.812
944222AF1-090 E
50/50
29.19529.195
276174W4-005 E
50/50
75.58675.586
965331AG1-398 C
50/50
0.3170.317
276615W2-048 GEN
50/50
13.36213.362
276621X2-022 GEN
50/50
45.73245.732
944221AF1-090 C
50/50
6.2366.236
991267J1714
External Queue
10.35616111755371110.356161117553711
991278J1725 C
External Queue
1.4686489105224611.468648910522461
991279J1725 E
External Queue
7.9457669258117687.945766925811768
992572J1022
External Queue
30.7744674682617230.77446746826172
954822J955
External Queue
182.9213104248047182.9213104248047
991037J1464 G
External Queue
87.473609924316487.4736099243164
956452J1139
External Queue
17.89773559570312517.897735595703125
990353J1289 C
External Queue
3.7201089859008793.720108985900879
956282J1115 C
External Queue
7.6140823364257817.614082336425781
990672J1360
External Queue
57.91726684570312557.917266845703125
956283J1115 E
External Queue
41.1941375732421941.19413757324219
991192J1610 G
External Queue
15.96568870544433615.965688705444336
990354J1289 E
External Queue
20.1267433166503920.12674331665039
990057J1201
External Queue
5.0432085990905765.043208599090576
991197J1626
External Queue
15.53424167633056615.534241676330566
991217J1653
External Queue
14.12162399291992214.121623992919922
CBM West 2LTFEXP_CBM-W2->PJM
CBM
35.39735.397
VTFLTFEXP_VFT->PJM
CMTX
5.3515.351
MECLTFEXP_MEC->PJM
CLTF
2.5112.511
CBM South 2LTFEXP_CBM-S2->PJM
CBM
21.09921.099
CPLELTFEXP_CPLE->PJM
CLTF
1.6981.698
SIGELTFEXP_SIGE->PJM
CLTF
0.4530.453
CBM NorthLTFEXP_CBM-N->PJM
CBM
1.0281.028
G-007ALTFEXP_G-007A->PJM
CMTX
1.9921.992
TVALTFEXP_TVA->PJM
CLTF
5.1685.168
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.8160.816
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.5651.565
LAGNLTFEXP_LAGN->PJM
CLTF
6.6886.688
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
CONTINGENCY 'COMED_P4_112-45-BT4-5___SRT-A'
 TRIP BRANCH FROM BUS 270666 TO BUS 270664 CKT 1   /*BLUE ISL ;BT 345.0 - BLUE ISL ; B 345.0
 TRIP BRANCH FROM BUS 270666 TO BUS 270926 CKT 1   /*BLUE ISL ;BT 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 270770 TO BUS 270666 CKT 1   /*GOODINGS ;4B 345.0 - BLUE ISL ;BT 345.0
 TRIP BRANCH FROM BUS 270852 TO BUS 270704 CKT 1   /*PONTIAC  ; B 345.0 - LORETTO  ; B 345.0
END
CONTINGENCY 'COMED_P4_012-45-BT12-14_SRT-A'
 TRIP BRANCH FROM BUS 270717 TO BUS 276657 CKT 1   /*DRESDEN  ; R 345.0 - AB1-122 TAP1 345.0
 TRIP BRANCH FROM BUS 270853 TO BUS 270717 CKT 1   /*PONTIAC  ; R 345.0 - DRESDEN  ; R 345.0
END
CONTINGENCY 'COMED_P4_012-45-BT14-15_SRT-A'
 TRIP BRANCH FROM BUS 270697 TO BUS 270717 CKT 1   /*COLLINS  ; R 345.0 - DRESDEN  ; R 345.0
 TRIP BRANCH FROM BUS 270853 TO BUS 270717 CKT 1   /*PONTIAC  ; R 345.0 - DRESDEN  ; R 345.0
END
255113 to 243219 ckt 1
274750 to 255112 ckt 1
270770 to 270766 ckt 1
270704 to 934720 ckt 1
270852 to 270704 ckt 1

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1AMIL/CE
7BROKAW-MCLEAN ; R 345.0 kV Ckt 1 line
COMED_P1-2_345-L8002___-S_SRT-A
OPAC106.74 %1793.0B1913.7866.09
GD1CE
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
765-L11216__-S_SRT-A
OPAC136.42 %1528.0B2084.539.9
GD1CE
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
Base Case
OPAC118.44 %1364.0A1615.5433.26
GD1CE
AD2-100 TP-AF1-090 TP 345.0 kV Ckt 1 line
EXT_347945 7PANA 345 347955 7AUSTIN 345 1 _SRT-S
OPAC103.32 %1201.0B1240.8933.12
GD1AMIL/CE
AF1-090 TP-7PANA 345.0 kV Ckt 1 line
EXT_347945 7PANA 345 347955 7AUSTIN 345 1 _SRT-S
OPAC111.16 %1201.0B1334.9733.12
GD1CE
BLUEMOUND; B-PONTIAC ; B 345.0 kV Ckt 1 line
COMED_P1-2_345-L8001___-S_SRT-A
OPAC130.87 %1528.0B1999.69170.44
GD1AMIL/CE
KINCAID ; B-7AUSTIN 345.0 kV Ckt 1 line
COMED_P1-2_345-L2105___-S_SRT-A-4
OPAC101.25 %1319.0B1335.4851.88
GD1CE
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
COMED_P1-2_345-L8014__R-S_SRT-A
OPAC173.47 %1528.0B2650.62124.25
GD1CE
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
Base Case
OPAC139.62 %1364.0A1904.3586.43
GD1CE
MCLEAN ; R-PONTIAC ; R 345.0 kV Ckt 1 line
COMED_P1-2_345-L8002___-S_SRT-A
OPAC141.56 %1726.0B2443.2466.0
GD1CE
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
COMED_P1-2_345-L8014__R-S_SRT-A
OPAC162.71 %1528.0B2486.15124.33
GD1CE
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
Base Case
OPAC130.92 %1334.0A1746.4686.5
GD1CE
PONTIAC ; R-DRESDEN ; R 345.0 kV Ckt 1 line
COMED_P1-2_345-L11212_B-S_SRT-A-2
OPAC139.52 %1656.0B2310.44111.08

Details for 7BROKAW-MCLEAN ; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L8002___-S_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AMIL/CE
Facility Description:
7BROKAW-MCLEAN ; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8002___-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:106.74 %
Rating:1793.0 MVA
Rating Type:B
MVA to Mitigate:1913.78
MW Contribution:66.09
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:AMIL/CE
Facility Description:
7BROKAW-MCLEAN ; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8002___-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:106.87 %
Rating:1793.0 MVA
Rating Type:B
MVA to Mitigate:1916.11
MW Contribution:66.1
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
14.26114.261
276174W4-005 E
50/50
57.3857.38
944222AF1-090 E
50/50
27.74227.742
965331AG1-398 C
50/50
0.3590.359
944221AF1-090 C
50/50
5.9265.926
276621X2-022 GEN
50/50
48.8148.81
936772AD2-100 E
50/50
15.59515.595
960141AF2-305_AG1-
50/50
2.8562.856
965091AG1-374 C
50/50
39.65439.654
965092AG1-374 E
50/50
26.43626.436
936771AD2-100 C
50/50
23.39223.392
290265S-028 E
50/50
35.73335.733
290261S-027 E
50/50
35.95335.953
960261AF2-317 C
50/50
0.6540.654
274880RADFORD R;1U
50/50
1.6421.642
960612AF2-352 E
50/50
6.6096.609
966091AG1-478 C
Adder
-1.3894117647058823-1.181
274650KINCAID ;1U
50/50
17.60217.602
925772AC1-053 E
50/50
51.42651.426
942481AE2-261 C
50/50
34.36634.366
274854TWINGROVE;U2
50/50
1.2891.289
936971AD2-131 C
50/50
1.5411.541
965912AG1-460 E
50/50
3.4483.448
957381AF2-032 C
50/50
2.6352.635
924266AB2-070 E
50/50
48.89148.891
959611AF2-252 C
50/50
4.4064.406
934101AD2-000 1
Adder
-4.918823529411765-4.181
274853TWINGROVE;U1
50/50
1.2531.253
959612AF2-252 E
50/50
6.6096.609
934111AD2-000 2
Adder
-3.688235294117647-3.135
965911AG1-460 C
50/50
2.2992.299
957382AF2-032 E
50/50
1.241.24
935141AD1-148 C
50/50
1.5531.553
276668AB2-070 C
50/50
1.3191.319
936972AD2-131 E
50/50
7.7427.742
942482AE2-261 E
50/50
22.91122.911
274651KINCAID ;2U
50/50
17.57617.576
925771AC1-053 C
50/50
1.2351.235
960611AF2-352 C
50/50
4.4064.406
991267J1714
External Queue
10.1913213729858410.19132137298584
991278J1725 C
External Queue
1.40026152133941651.4002615213394165
991279J1725 E
External Queue
7.57577371597297.5757737159729
992572J1022
External Queue
35.38640975952148435.386409759521484
954822J955
External Queue
174.54541015625174.54541015625
991037J1464 G
External Queue
83.0289993286132883.02899932861328
956452J1139
External Queue
19.09152412414550819.091524124145508
990353J1289 C
External Queue
3.5035326480865483.503532648086548
956282J1115 C
External Queue
6.8979754447937016.897975444793701
990672J1360
External Queue
60.49182510375976660.491825103759766
990272J1263 G
External Queue
33.9719314575195333.97193145751953
956283J1115 E
External Queue
37.3198165893554737.31981658935547
991192J1610 G
External Queue
15.35127735137939515.351277351379395
990354J1289 E
External Queue
18.9550094604492218.95500946044922
990057J1201
External Queue
4.9176378250122074.917637825012207
991197J1626
External Queue
15.28698158264160215.286981582641602
991217J1653
External Queue
13.46405220031738313.464052200317383
CBM NorthLTFEXP_CBM-N->PJM
CBM
1.2061.206
G-007ALTFEXP_G-007A->PJM
CMTX
2.3192.319
TVALTFEXP_TVA->PJM
CLTF
5.0055.005
MDUPJM->LTFIMP_MDU
CLTF
0.0230.023
CBM West 2LTFEXP_CBM-W2->PJM
CBM
34.41934.419
VTFLTFEXP_VFT->PJM
CMTX
6.2296.229
MECLTFEXP_MEC->PJM
CLTF
1.5021.502
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.830.83
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.6041.604
LAGNLTFEXP_LAGN->PJM
CLTF
6.3376.337
CBM South 2LTFEXP_CBM-S2->PJM
CBM
21.16921.169
CPLELTFEXP_CPLE->PJM
CLTF
1.7271.727
SIGELTFEXP_SIGE->PJM
CLTF
0.4550.455

Details for AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line l/o 765-L11216__-S_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
Contingency Name:
765-L11216__-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:136.42 %
Rating:1528.0 MVA
Rating Type:B
MVA to Mitigate:2084.5
MW Contribution:39.9
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
Contingency Name:
765-L11216__-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:138.03 %
Rating:1528.0 MVA
Rating Type:B
MVA to Mitigate:2109.1
MW Contribution:40.16
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
937002AD2-134 E
Adder
5.8717647058823524.991
276615W2-048 GEN
Adder
4.7835294117647064.066
276174W4-005 E
Adder
25.75411764705882321.891
274888KELLY CRK;1U
50/50
0.9040.904
943592AF1-030 E
Adder
2.62117647058823572.228
943591AF1-030 C
Adder
5.297647058823534.503
938861AE1-114 C
Adder
2.21.87
294763P-046 E
Adder
5.1811764705882364.404
957471AF2-041 C
Adder
12.02000000000000110.217
944222AF1-090 E
Adder
10.8870588235294119.254
934721AD1-100 C
50/50
7.0137.013
274660LASCO STA;1U
50/50
30.56730.567
960752AF2-366 E
Adder
2.68235294117647042.28
937312AD2-172 E
Adder
1.8635294117647061.584
274859EASYR;U1 E
Adder
6.7258823529411765.717
934722AD1-100 E
50/50
213.036213.036
960592AF2-350 E
50/50
6.3246.324
275149KELLYCK ;1E
50/50
22.13322.133
960591AF2-350 C
50/50
9.4869.486
960751AF2-366 C
Adder
4.0235294117647063.42
293715O-029 E
Adder
5.8564705882352944.978
944221AF1-090 C
Adder
2.32588235294117671.977
276621X2-022 GEN
Adder
16.37176470588235213.916
940502AE2-035 E
Adder
1.8635294117647061.584
959091AF2-200 C
Adder
8.0129411764705896.811
936772AD2-100 E
Adder
6.1494117647058835.227
960141AF2-305_AG1-
Adder
0.88235294117647060.75
965091AG1-374 C
50/50
23.9423.94
965092AG1-374 E
50/50
15.9615.96
924048AB2-047 E1
50/50
15.28415.284
959341AF2-225 C
50/50
8.9248.924
276655AB2-047 C1
50/50
0.3760.376
966092AG1-478 E
50/50
0.4020.402
962692AG1-118 E
Adder
8.515294117647067.238
962691AG1-118 C
Adder
12.77176470588235310.856
272363ESS H440 ; R
Adder
1.52705882352941181.298
926822AC1-168 E
Adder
6.1435294117647075.222
274891CAYUG;2U E
50/50
25.40125.401
274864CAYUGA RI;2U
50/50
0.7780.778
941551AE2-152 C
50/50
27.3927.39
295109WESTBROOK E
Adder
3.25176470588235272.764
990901L-005 E
Adder
8.6541176470588247.356
936771AD2-100 C
Adder
9.2247058823529417.841
936512AD2-066 E
Adder
3.63882352941176463.093
936511AD2-066 C
Adder
5.4588235294117654.64
290265S-028 E
50/50
21.57221.572
290261S-027 E
50/50
21.70521.705
274871GR RIDGE ;2U
50/50
0.240.24
962012AG1-044 E
Adder
0.0364705882352941160.031
925582AC1-033 E
Adder
6.385.423
959342AF2-225 E
50/50
12.32412.324
924049AB2-047 E2
50/50
15.52515.525
274890CAYUG;1U E
50/50
25.40125.401
274847GR RIDGE ;BU
50/50
0.6440.644
941552AE2-152 E
50/50
18.2618.26
294410BSHIL;2U E
Adder
5.824.947
916212CRESCENT ;1U
Adder
3.42588235294117642.912
959081AF2-199 C
Adder
4.00705882352941253.406
960612AF2-352 E
50/50
3.993.99
939741AE1-205 C
50/50
11.89911.899
942111AE2-223 C
50/50
2.7622.762
917502Z2-087 E
50/50
24.64724.647
966091AG1-478 C
50/50
1.5961.596
933411AC2-154 C
50/50
3.0043.004
958011AF2-095 C
50/50
13.65913.659
966441AG1-513 C
Adder
0.28470588235294120.242
925772AC1-053 E
Adder
16.27882352941176313.837
936372AD2-047 E
50/50
26.24526.245
274654BRAIDWOOD;1U
50/50
40.69940.699
276591L-013 2
Adder
2.00705882352941161.706
962781AG1-127 C
Adder
4.0341176470588243.429
933911AD1-013 C
Adder
1.06941176470588250.909
293717O-029 E
Adder
2.9517647058823532.509
293516O-009 E
Adder
11.324705882352949.626
927208AC1-214 E1
Adder
2.3117647058823531.965
276173Z2-081
50/50
0.1940.194
942481AE2-261 C
Adder
13.5729411764705911.537
274854TWINGROVE;U2
50/50
0.7780.778
274863CAYUGA RI;1U
50/50
0.7780.778
943122AE2-341 E
Adder
3.91176470588235333.325
916221Z1-073 E
Adder
4.283.638
938862AE1-114 E
Adder
7.50470588235294046.379
959092AF2-200 E
Adder
5.3423529411764714.541
957472AF2-041 E
Adder
6.0094117647058825.108
926821AC1-168 C
Adder
0.91529411764705890.778
936971AD2-131 C
Adder
0.60823529411764710.517
965912AG1-460 E
Adder
1.36235294117647051.158
957381AF2-032 C
Adder
1.04117647058823540.885
924266AB2-070 E
Adder
15.10823529411764812.842
959611AF2-252 C
50/50
2.662.66
270681BRIGHTSTK; R
50/50
0.6020.602
934101AD2-000 1
Adder
3.4423529411764712.926
294392P-010 E
50/50
21.92721.927
939352AE1-166 E
50/50
21.91221.912
274661LASCO STA;2U
50/50
30.67130.671
290108LEEDK;1U E
Adder
13.96705882352941211.872
290051GSG-6; E
Adder
6.07294117647058855.162
958912AF2-182 E
Adder
6.0364705882352955.131
294401BSHIL;1U E
Adder
5.824.947
959082AF2-199 E
Adder
2.00352941176470621.703
274853TWINGROVE;U1
50/50
0.7560.756
959612AF2-252 E
50/50
3.993.99
276656AB2-047 C2
50/50
0.3760.376
942112AE2-223 E
50/50
18.48618.486
274887PILOT HIL;1U
50/50
0.9040.904
958012AF2-095 E
50/50
9.1069.106
966442AG1-513 E
Adder
0.427058823529411770.363
293716O-029 E
Adder
3.2117647058823532.73
293771O-035 E
Adder
4.8764705882352944.145
965911AG1-460 C
Adder
0.90823529411764710.772
957382AF2-032 E
Adder
0.48941176470588230.416
939742AE1-205 E
50/50
16.43216.432
933912AD1-013 E
Adder
1.7082352941176471.452
295111SUBLETTE E
Adder
1.58117647058823541.344
274860EASYR;U2 E
Adder
6.7258823529411765.717
927209AC1-214 E2
Adder
2.3117647058823531.965
936972AD2-131 E
Adder
3.05294117647058852.595
942482AE2-261 E
Adder
9.0482352941176487.691
293061N-015 E
50/50
17.26517.265
939351AE1-166 C
50/50
23.73823.738
293519PILOT HIL;1E
50/50
22.13322.133
274674JOLIET 9 ;6U
Adder
21.01647058823529717.864
943121AE2-341 C
Adder
7.9658823529411766.771
960611AF2-352 C
50/50
2.662.66
936461AD2-060 C
50/50
3.1623.162
936371AD2-047 C
50/50
5.3765.376
933412AC2-154 E
50/50
4.9014.901
274655BRAIDWOOD;2U
50/50
39.44139.441
962782AG1-127 E
Adder
2.68470588235294152.282
946671AF1-331 C
Adder
1.3882352941176471.18
276170Z1-108 E
Adder
1.51058823529411781.284
920272AA2-123 E
Adder
1.5152941176470591.288
276626AG1-044 E
Adder
0.043529411764705880.037
CBM West 2LTFEXP_CBM-W2->PJM
CBM
14.15914.159
WECLTFEXP_WEC->PJM
CLTF
1.9381.938
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.2330.233
SIGELTFEXP_SIGE->PJM
CLTF
0.0690.069
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.2610.261
MECLTFEXP_MEC->PJM
CLTF
8.128.12
O66PJM->LTFIMP_O-066
CMTX_NF
8.5428.542
G-007PJM->LTFIMP_G-007
CMTX_NF
1.3311.331
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1240.124
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.6030.603
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.4090.409
CBM West 1LTFEXP_CBM-W1->PJM
CBM
46.09146.091
NYPJM->LTFIMP_NY
CLTF
0.7180.718
TVALTFEXP_TVA->PJM
CLTF
1.4341.434
LAGNLTFEXP_LAGN->PJM
CLTF
2.9712.971

Details for AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:118.44 %
Rating:1364.0 MVA
Rating Type:A
MVA to Mitigate:1615.54
MW Contribution:33.26
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:119.45 %
Rating:1364.0 MVA
Rating Type:A
MVA to Mitigate:1629.34
MW Contribution:33.43
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
Adder
3.81058823529411763.239
276174W4-005 E
Adder
20.91647058823529517.779
274888KELLY CRK;1U
50/50
0.7710.771
944222AF1-090 E
Adder
8.4882352941176477.215
934721AD1-100 C
50/50
6.5466.546
274660LASCO STA;1U
50/50
23.3723.37
934722AD1-100 E
50/50
198.856198.856
960592AF2-350 E
50/50
5.3895.389
275149KELLYCK ;1E
50/50
18.86218.862
960591AF2-350 C
50/50
8.0848.084
944221AF1-090 C
Adder
1.81294117647058831.541
276621X2-022 GEN
Adder
13.04117647058823711.085
936772AD2-100 E
Adder
4.8070588235294124.086
960141AF2-305_AG1-
Adder
0.71058823529411760.604
965091AG1-374 C
50/50
19.95319.953
965092AG1-374 E
50/50
13.30213.302
924048AB2-047 E1
50/50
12.78112.781
959341AF2-225 C
50/50
7.4627.462
276655AB2-047 C1
50/50
0.3150.315
966092AG1-478 E
Adder
0.28235294117647060.24
926822AC1-168 E
Adder
3.99529411764705873.396
274891CAYUG;2U E
50/50
22.61422.614
274864CAYUGA RI;2U
50/50
0.6930.693
941551AE2-152 C
50/50
25.56725.567
936771AD2-100 C
Adder
7.2094117647058836.128
290265S-028 E
50/50
17.9817.98
290261S-027 E
50/50
18.09118.091
274871GR RIDGE ;2U
50/50
0.1770.177
959342AF2-225 E
50/50
10.30510.305
924049AB2-047 E2
50/50
12.98212.982
274890CAYUG;1U E
50/50
22.61422.614
274847GR RIDGE ;BU
50/50
0.4750.475
941552AE2-152 E
50/50
17.04517.045
960612AF2-352 E
50/50
3.3253.325
939741AE1-205 C
50/50
9.959.95
942111AE2-223 C
50/50
2.312.31
917502Z2-087 E
50/50
20.6120.61
966091AG1-478 C
Adder
1.12235294117647060.954
933411AC2-154 C
50/50
2.562.56
958011AF2-095 C
50/50
11.6411.64
925772AC1-053 E
Adder
13.06941176470588311.109
936372AD2-047 E
50/50
22.36722.367
274654BRAIDWOOD;1U
50/50
35.7235.72
942481AE2-261 C
Adder
10.6152941176470599.023
274854TWINGROVE;U2
50/50
0.6480.648
274863CAYUGA RI;1U
50/50
0.6930.693
926821AC1-168 C
Adder
0.59529411764705890.506
936971AD2-131 C
Adder
0.475294117647058870.404
965912AG1-460 E
Adder
1.06470588235294120.905
957381AF2-032 C
Adder
0.81411764705882350.692
924266AB2-070 E
Adder
12.17058823529411910.345
959611AF2-252 C
50/50
2.2172.217
270681BRIGHTSTK; R
50/50
0.5030.503
294392P-010 E
50/50
16.15716.157
939352AE1-166 E
50/50
20.45420.454
274661LASCO STA;2U
50/50
23.4523.45
274853TWINGROVE;U1
50/50
0.630.63
959612AF2-252 E
50/50
3.3253.325
276656AB2-047 C2
50/50
0.3150.315
942112AE2-223 E
50/50
15.45815.458
274887PILOT HIL;1U
50/50
0.7710.771
958012AF2-095 E
50/50
7.767.76
965911AG1-460 C
Adder
0.71058823529411760.604
957382AF2-032 E
Adder
0.38352941176470590.326
939742AE1-205 E
50/50
13.7413.74
936972AD2-131 E
Adder
2.38588235294117632.028
942482AE2-261 E
Adder
7.0764705882352946.015
293061N-015 E
50/50
12.72212.722
939351AE1-166 C
50/50
22.15822.158
293519PILOT HIL;1E
50/50
18.86218.862
960611AF2-352 C
50/50
2.2172.217
936461AD2-060 C
50/50
2.6952.695
936371AD2-047 C
50/50
4.5814.581
933412AC2-154 E
50/50
4.1774.177
274655BRAIDWOOD;2U
50/50
34.57234.572
956282J1115 C
External Queue
1.80338597297668461.8033859729766846
956283J1115 E
External Queue
9.7567806243896489.756780624389648
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.1160.116
MECLTFEXP_MEC->PJM
CLTF
4.254.25
O66PJM->LTFIMP_O-066
CMTX_NF
4.964.96
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7730.773
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0480.048
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.1150.115
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1960.196
CBM West 1LTFEXP_CBM-W1->PJM
CBM
19.23219.232
NYPJM->LTFIMP_NY
CLTF
0.4180.418
TVALTFEXP_TVA->PJM
CLTF
1.0661.066
LAGNLTFEXP_LAGN->PJM
CLTF
1.9731.973
CBM West 2LTFEXP_CBM-W2->PJM
CBM
10.09110.091
WECLTFEXP_WEC->PJM
CLTF
0.7530.753
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0640.064
SIGELTFEXP_SIGE->PJM
CLTF
0.0670.067

Details for AD2-100 TP-AF1-090 TP 345.0 kV Ckt 1 line l/o EXT_347945 7PANA 345 347955 7AUSTIN 345 1 _SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
AD2-100 TP-AF1-090 TP 345.0 kV Ckt 1 line
Contingency Name:
EXT_347945 7PANA 345 347955 7AUSTIN 345 1 _SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:103.32 %
Rating:1201.0 MVA
Rating Type:B
MVA to Mitigate:1240.89
MW Contribution:33.12
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:CE
Facility Description:
AD2-100 TP-AF1-090 TP 345.0 kV Ckt 1 line
Contingency Name:
EXT_347945 7PANA 345 347955 7AUSTIN 345 1 _SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:103.23 %
Rating:1201.0 MVA
Rating Type:B
MVA to Mitigate:1239.82
MW Contribution:33.13
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
10.85110.851
276174W4-005 E
50/50
37.70537.705
936292AD2-038 E
Adder
6.78352941176470655.766
290021O50 E
Adder
8.8917647058823547.558
965331AG1-398 C
50/50
0.1890.189
942422AE2-255 E
Adder
4.1682352941176483.543
276621X2-022 GEN
50/50
37.1437.14
918052AA1-018 E OP
Adder
6.7294117647058825.72
936772AD2-100 E
50/50
31.79731.797
960141AF2-305_AG1-
50/50
1.5051.505
942652AE2-281 E
Adder
2.362.006
942651AE2-281 C
Adder
0.38470588235294120.327
938851AE1-113 C
Adder
3.6682352941176473.118
965091AG1-374 C
50/50
19.87419.874
965092AG1-374 E
50/50
13.24913.249
924048AB2-047 E1
Adder
9.9435294117647068.452
959341AF2-225 C
Adder
5.8058823529411764.935
926822AC1-168 E
Adder
4.1882352941176473.56
958481AF2-142 C
Adder
4.6411764705882353.945
274891CAYUG;2U E
Adder
8.577647058823537.291
990901L-005 E
Adder
7.8164705882352946.644
936771AD2-100 C
50/50
47.69547.695
936512AD2-066 E
Adder
2.50235294117647022.127
936511AD2-066 C
Adder
3.75411764705882333.191
290265S-028 E
50/50
17.90917.909
290261S-027 E
50/50
18.01918.019
925582AC1-033 E
Adder
5.4317647058823534.617
938852AE1-113 E
Adder
13.00352941176470811.053
959342AF2-225 E
Adder
8.017647058823536.815
924049AB2-047 E2
Adder
10.1000000000000018.585
958482AF2-142 E
Adder
3.09411764705882362.63
274890CAYUG;1U E
Adder
8.577647058823537.291
294410BSHIL;2U E
Adder
4.9564705882352954.213
916212CRESCENT ;1U
Adder
2.7952941176470592.376
960261AF2-317 C
50/50
0.4970.497
274880RADFORD R;1U
50/50
1.0791.079
960612AF2-352 E
50/50
3.3123.312
939741AE1-205 C
Adder
7.7411764705882356.58
942111AE2-223 C
Adder
1.7964705882352941.527
917502Z2-087 E
Adder
16.03411764705882413.629
274650KINCAID ;1U
50/50
25.63925.639
925772AC1-053 E
50/50
30.53230.532
927208AC1-214 E1
Adder
1.88588235294117661.603
942481AE2-261 C
50/50
55.28655.286
939322AE1-163 E
Adder
16.5214.042
274854TWINGROVE;U2
50/50
0.6460.646
926821AC1-168 C
Adder
0.62352941176470590.53
936971AD2-131 C
50/50
3.1423.142
965912AG1-460 E
50/50
5.5475.547
957381AF2-032 C
50/50
3.8383.838
924266AB2-070 E
50/50
25.75725.757
958492AF2-143 E
Adder
3.29294117647058832.799
942421AE2-255 C
Adder
1.38941176470588231.181
294401BSHIL;1U E
Adder
4.9564705882352954.213
274853TWINGROVE;U1
50/50
0.6280.628
959612AF2-252 E
50/50
3.3123.312
942112AE2-223 E
Adder
12.02588235294117610.222
293771O-035 E
Adder
3.9788235294117653.382
965911AG1-460 C
50/50
3.6983.698
957382AF2-032 E
50/50
1.8061.806
935141AD1-148 C
50/50
1.1821.182
276668AB2-070 C
50/50
0.6950.695
958491AF2-143 C
Adder
4.93999999999999954.199
939742AE1-205 E
Adder
10.6894117647058829.086
959611AF2-252 C
50/50
2.2082.208
934101AD2-000 1
Adder
2.45058823529411772.083
927209AC1-214 E2
Adder
1.88588235294117661.603
936972AD2-131 E
50/50
15.78515.785
942482AE2-261 E
50/50
36.85736.857
939321AE1-163 C
Adder
2.68941176470588242.286
274651KINCAID ;2U
50/50
25.48325.483
925771AC1-053 C
50/50
0.7330.733
960611AF2-352 C
50/50
2.2082.208
991278J1725 C
External Queue
1.44371831417083741.4437183141708374
991279J1725 E
External Queue
7.8108863830566417.810886383056641
954822J955
External Queue
262.7981262207031262.7981262207031
991037J1464 G
External Queue
126.00550842285156126.00550842285156
990353J1289 C
External Queue
5.3797950744628915.379795074462891
990752J1383
External Queue
12.49752712249755912.497527122497559
991303J1755 C
External Queue
1.32411563396453861.3241156339645386
956282J1115 C
External Queue
3.62764692306518553.6276469230651855
990272J1263 G
External Queue
-30.302356719970703-30.302356719970703
991304J1755 E
External Queue
7.163879394531257.16387939453125
956283J1115 E
External Queue
19.6264991760253919.62649917602539
991192J1610 G
External Queue
16.49483680725097716.494836807250977
990354J1289 E
External Queue
29.10606956481933629.106069564819336
990052J1200
External Queue
1.41204094886779791.4120409488677979
990057J1201
External Queue
-9.258943557739258-9.258943557739258
991217J1653
External Queue
13.88190650939941413.881906509399414
NYPJM->LTFIMP_NY
CLTF
0.4980.498
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.5690.569
BlueGrassPJM->LTFIMP_BlueG
CLTF
3.3633.363
WECLTFEXP_WEC->PJM
CLTF
1.3471.347
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
17.01817.018
O66PJM->LTFIMP_O-066
CMTX_NF
6.2466.246
CBM West 1LTFEXP_CBM-W1->PJM
CBM
35.35535.355
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
4.9624.962
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
1.0421.042
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
2.5412.541
G-007PJM->LTFIMP_G-007
CMTX_NF
0.9760.976
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.8960.896
MECLTFEXP_MEC->PJM
CLTF
3.7833.783
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
1.1141.114

Details for AF1-090 TP-7PANA 345.0 kV Ckt 1 line l/o EXT_347945 7PANA 345 347955 7AUSTIN 345 1 _SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AMIL/CE
Facility Description:
AF1-090 TP-7PANA 345.0 kV Ckt 1 line
Contingency Name:
EXT_347945 7PANA 345 347955 7AUSTIN 345 1 _SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:111.16 %
Rating:1201.0 MVA
Rating Type:B
MVA to Mitigate:1334.97
MW Contribution:33.12
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AMIL/CE
Facility Description:
AF1-090 TP-7PANA 345.0 kV Ckt 1 line
Contingency Name:
EXT_347945 7PANA 345 347955 7AUSTIN 345 1 _SRT-S
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:111.05 %
Rating:1201.0 MVA
Rating Type:B
MVA to Mitigate:1333.77
MW Contribution:33.13
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
10.85110.851
276174W4-005 E
50/50
37.70537.705
936292AD2-038 E
Adder
6.78352941176470655.766
290021O50 E
Adder
8.8917647058823547.558
944222AF1-090 E
50/50
96.36896.368
965331AG1-398 C
50/50
0.1890.189
942422AE2-255 E
Adder
4.1682352941176483.543
944221AF1-090 C
50/50
20.58320.583
276621X2-022 GEN
50/50
37.1437.14
936772AD2-100 E
50/50
31.79731.797
960141AF2-305_AG1-
50/50
1.5051.505
942652AE2-281 E
Adder
2.362.006
942651AE2-281 C
Adder
0.38470588235294120.327
938851AE1-113 C
Adder
3.6682352941176473.118
965091AG1-374 C
50/50
19.87419.874
965092AG1-374 E
50/50
13.24913.249
924048AB2-047 E1
Adder
9.9435294117647068.452
959341AF2-225 C
Adder
5.8058823529411764.935
926822AC1-168 E
Adder
4.1882352941176473.56
274891CAYUG;2U E
Adder
8.577647058823537.291
990901L-005 E
Adder
7.8164705882352946.644
936771AD2-100 C
50/50
47.69547.695
290265S-028 E
50/50
17.90917.909
290261S-027 E
50/50
18.01918.019
925582AC1-033 E
Adder
5.4317647058823534.617
938852AE1-113 E
Adder
13.00352941176470811.053
959342AF2-225 E
Adder
8.017647058823536.815
924049AB2-047 E2
Adder
10.1000000000000018.585
274890CAYUG;1U E
Adder
8.577647058823537.291
294410BSHIL;2U E
Adder
4.9564705882352954.213
916212CRESCENT ;1U
Adder
2.7952941176470592.376
960261AF2-317 C
50/50
0.4970.497
274880RADFORD R;1U
50/50
1.0791.079
960612AF2-352 E
50/50
3.3123.312
939741AE1-205 C
Adder
7.7411764705882356.58
942111AE2-223 C
Adder
1.7964705882352941.527
917502Z2-087 E
Adder
16.03411764705882413.629
274650KINCAID ;1U
50/50
25.63925.639
925772AC1-053 E
50/50
30.53230.532
927208AC1-214 E1
Adder
1.88588235294117661.603
942481AE2-261 C
50/50
55.28655.286
939322AE1-163 E
Adder
16.5214.042
274854TWINGROVE;U2
50/50
0.6460.646
926821AC1-168 C
Adder
0.62352941176470590.53
936971AD2-131 C
50/50
3.1423.142
965912AG1-460 E
50/50
5.5475.547
957381AF2-032 C
50/50
3.8383.838
924266AB2-070 E
50/50
25.75725.757
958492AF2-143 E
Adder
3.29294117647058832.799
942421AE2-255 C
Adder
1.38941176470588231.181
959611AF2-252 C
50/50
2.2082.208
294401BSHIL;1U E
Adder
4.9564705882352954.213
274853TWINGROVE;U1
50/50
0.6280.628
959612AF2-252 E
50/50
3.3123.312
942112AE2-223 E
Adder
12.02588235294117610.222
293771O-035 E
Adder
3.9788235294117653.382
965911AG1-460 C
50/50
3.6983.698
957382AF2-032 E
50/50
1.8061.806
935141AD1-148 C
50/50
1.1821.182
276668AB2-070 C
50/50
0.6950.695
958491AF2-143 C
Adder
4.93999999999999954.199
939742AE1-205 E
Adder
10.6894117647058829.086
927209AC1-214 E2
Adder
1.88588235294117661.603
936972AD2-131 E
50/50
15.78515.785
942482AE2-261 E
50/50
36.85736.857
939321AE1-163 C
Adder
2.68941176470588242.286
274651KINCAID ;2U
50/50
25.48325.483
925771AC1-053 C
50/50
0.7330.733
960611AF2-352 C
50/50
2.2082.208
991278J1725 C
External Queue
1.44371831417083741.4437183141708374
991279J1725 E
External Queue
7.8108863830566417.810886383056641
954822J955
External Queue
262.7981262207031262.7981262207031
991037J1464 G
External Queue
126.00550842285156126.00550842285156
990353J1289 C
External Queue
5.3797950744628915.379795074462891
990752J1383
External Queue
12.49752712249755912.497527122497559
991303J1755 C
External Queue
1.32411563396453861.3241156339645386
956282J1115 C
External Queue
3.62764692306518553.6276469230651855
990272J1263 G
External Queue
-30.302356719970703-30.302356719970703
991304J1755 E
External Queue
7.163879394531257.16387939453125
956283J1115 E
External Queue
19.6264991760253919.62649917602539
991192J1610 G
External Queue
16.49483680725097716.494836807250977
990354J1289 E
External Queue
29.10606956481933629.106069564819336
990052J1200
External Queue
1.41204094886779791.4120409488677979
990057J1201
External Queue
-9.258943557739258-9.258943557739258
991217J1653
External Queue
13.88190650939941413.881906509399414
NYPJM->LTFIMP_NY
CLTF
0.4980.498
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.5690.569
BlueGrassPJM->LTFIMP_BlueG
CLTF
3.3633.363
WECLTFEXP_WEC->PJM
CLTF
1.3471.347
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
17.01817.018
O66PJM->LTFIMP_O-066
CMTX_NF
6.2466.246
CBM West 1LTFEXP_CBM-W1->PJM
CBM
35.35535.355
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
4.9624.962
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
1.0421.042
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
2.5412.541
G-007PJM->LTFIMP_G-007
CMTX_NF
0.9760.976
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.8960.896
MECLTFEXP_MEC->PJM
CLTF
3.7833.783
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
1.1141.114

Details for BLUEMOUND; B-PONTIAC ; B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L8001___-S_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
BLUEMOUND; B-PONTIAC ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8001___-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:130.87 %
Rating:1528.0 MVA
Rating Type:B
MVA to Mitigate:1999.69
MW Contribution:170.44
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:CE
Facility Description:
BLUEMOUND; B-PONTIAC ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8001___-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:131.04 %
Rating:1528.0 MVA
Rating Type:B
MVA to Mitigate:2002.28
MW Contribution:170.41
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
8.9088.908
276174W4-005 E
50/50
80.84980.849
944222AF1-090 E
50/50
23.63523.635
965331AG1-398 C
50/50
0.1890.189
944221AF1-090 C
50/50
5.0485.048
276621X2-022 GEN
50/50
30.48930.489
936772AD2-100 E
50/50
13.44513.445
960141AF2-305_AG1-
50/50
1.5031.503
965091AG1-374 C
50/50
102.264102.264
965092AG1-374 E
50/50
68.17668.176
924048AB2-047 E1
50/50
17.39317.393
959341AF2-225 C
50/50
10.15510.155
276655AB2-047 C1
50/50
0.4280.428
936771AD2-100 C
50/50
20.16820.168
290265S-028 E
50/50
92.15192.151
290261S-027 E
50/50
92.7292.72
959342AF2-225 E
50/50
14.02414.024
924049AB2-047 E2
50/50
17.66717.667
960261AF2-317 C
50/50
0.4080.408
274880RADFORD R;1U
50/50
2.3142.314
960612AF2-352 E
50/50
17.04417.044
939741AE1-205 C
50/50
13.5413.54
942111AE2-223 C
50/50
3.1433.143
917502Z2-087 E
50/50
28.04828.048
274650KINCAID ;1U
50/50
15.24815.248
925772AC1-053 E
50/50
28.50428.504
942481AE2-261 C
50/50
29.73329.733
274854TWINGROVE;U2
50/50
3.3243.324
936971AD2-131 C
50/50
1.3281.328
965912AG1-460 E
50/50
2.9832.983
957381AF2-032 C
50/50
2.2832.283
924266AB2-070 E
50/50
25.72325.723
959611AF2-252 C
50/50
11.36311.363
270681BRIGHTSTK; R
50/50
0.6850.685
934101AD2-000 1
Adder
-3.7282352941176473-3.169
274853TWINGROVE;U1
50/50
3.2313.231
959612AF2-252 E
50/50
17.04417.044
276656AB2-047 C2
50/50
0.4280.428
942112AE2-223 E
50/50
21.03621.036
965911AG1-460 C
50/50
1.9891.989
957382AF2-032 E
50/50
1.0741.074
935141AD1-148 C
50/50
0.970.97
276668AB2-070 C
50/50
0.6940.694
939742AE1-205 E
50/50
18.69818.698
936972AD2-131 E
50/50
6.6756.675
942482AE2-261 E
50/50
19.82219.822
274651KINCAID ;2U
50/50
15.26815.268
925771AC1-053 C
50/50
0.6850.685
960611AF2-352 C
50/50
11.36311.363
991267J1714
External Queue
8.4490737915039068.449073791503906
992572J1022
External Queue
18.277105331420918.2771053314209
954822J955
External Queue
152.35487365722656152.35487365722656
991037J1464 G
External Queue
72.3532104492187572.35321044921875
956452J1139
External Queue
12.93863773345947312.938637733459473
990353J1289 C
External Queue
3.04548144340515143.0454814434051514
956282J1115 C
External Queue
6.8694252967834476.869425296783447
990672J1360
External Queue
42.3807449340820342.38074493408203
956283J1115 E
External Queue
37.1653518676757837.16535186767578
991192J1610 G
External Queue
12.97992038726806612.979920387268066
990354J1289 E
External Queue
16.47683525085449216.476835250854492
990057J1201
External Queue
4.1351618766784674.135161876678467
991197J1626
External Queue
12.6736106872558612.67361068725586
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.8630.863
G-007ALTFEXP_G-007A->PJM
CMTX
1.6691.669
TVALTFEXP_TVA->PJM
CLTF
3.9413.941
MDUPJM->LTFIMP_MDU
CLTF
0.0070.007
CBM West 2LTFEXP_CBM-W2->PJM
CBM
26.51726.517
VTFLTFEXP_VFT->PJM
CMTX
4.4844.484
MECLTFEXP_MEC->PJM
CLTF
1.3441.344
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.6310.631
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.1951.195
LAGNLTFEXP_LAGN->PJM
CLTF
5.0515.051
CBM South 2LTFEXP_CBM-S2->PJM
CBM
16.22316.223
CPLELTFEXP_CPLE->PJM
CLTF
1.3131.313
SIGELTFEXP_SIGE->PJM
CLTF
0.3440.344

Details for KINCAID ; B-7AUSTIN 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L2105___-S_SRT-A-4


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AMIL/CE
Facility Description:
KINCAID ; B-7AUSTIN 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L2105___-S_SRT-A-4
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:101.25 %
Rating:1319.0 MVA
Rating Type:B
MVA to Mitigate:1335.48
MW Contribution:51.88
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AMIL/CE
Facility Description:
KINCAID ; B-7AUSTIN 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L2105___-S_SRT-A-4
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.95 %
Rating:1319.0 MVA
Rating Type:B
MVA to Mitigate:1331.48
MW Contribution:51.87
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
17.52417.524
276174W4-005 E
50/50
63.44763.447
944222AF1-090 E
50/50
79.54479.544
965331AG1-398 C
50/50
0.3050.305
944221AF1-090 C
50/50
16.9916.99
276621X2-022 GEN
50/50
59.97859.978
936772AD2-100 E
50/50
40.54540.545
960141AF2-305_AG1-
50/50
2.4272.427
965091AG1-374 C
50/50
31.13131.131
965092AG1-374 E
50/50
20.75420.754
924048AB2-047 E1
50/50
14.78514.785
959341AF2-225 C
50/50
8.6338.633
276655AB2-047 C1
50/50
0.3640.364
274891CAYUG;2U E
Adder
11.249.554
936771AD2-100 C
50/50
60.81760.817
290265S-028 E
50/50
28.05228.052
290261S-027 E
50/50
28.22528.225
959342AF2-225 E
50/50
11.92111.921
924049AB2-047 E2
50/50
15.01815.018
274890CAYUG;1U E
Adder
11.249.554
960261AF2-317 C
50/50
0.8030.803
274880RADFORD R;1U
50/50
1.8161.816
960612AF2-352 E
50/50
5.1885.188
939741AE1-205 C
50/50
11.5111.51
942111AE2-223 C
50/50
2.6722.672
917502Z2-087 E
50/50
23.84223.842
274650KINCAID ;1U
50/50
43.85343.853
925772AC1-053 E
50/50
49.26549.265
942481AE2-261 C
50/50
86.59286.592
274854TWINGROVE;U2
50/50
1.0121.012
274853TWINGROVE;U1
50/50
0.9840.984
959612AF2-252 E
50/50
5.1885.188
276656AB2-047 C2
50/50
0.3640.364
942112AE2-223 E
50/50
17.88217.882
965911AG1-460 C
50/50
5.7925.792
957382AF2-032 E
50/50
3.0893.089
935141AD1-148 C
50/50
1.9091.909
936971AD2-131 C
50/50
4.0064.006
965912AG1-460 E
50/50
8.6888.688
957381AF2-032 C
50/50
6.5646.564
924266AB2-070 E
50/50
41.54241.542
959611AF2-252 C
50/50
3.4593.459
270681BRIGHTSTK; R
50/50
0.5820.582
276668AB2-070 C
50/50
1.1211.121
939742AE1-205 E
50/50
15.89515.895
936972AD2-131 E
50/50
20.12820.128
942482AE2-261 E
50/50
57.72857.728
274651KINCAID ;2U
50/50
43.97343.973
925771AC1-053 C
50/50
1.1841.184
960611AF2-352 C
50/50
3.4593.459
992572J1022
External Queue
19.09697341918945319.096973419189453
956282J1115 C
External Queue
7.1962580680847177.196258068084717
990672J1360
External Queue
39.93163681030273439.931636810302734
956283J1115 E
External Queue
38.9336013793945338.93360137939453
990057J1201
External Queue
-5.927828311920166-5.927828311920166
G-007PJM->LTFIMP_G-007
CMTX_NF
0.80.8
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.9820.982
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.3542.354
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
1.1961.196
NYPJM->LTFIMP_NY
CLTF
0.4010.401
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.6350.635
O66PJM->LTFIMP_O-066
CMTX_NF
5.1175.117
WECLTFEXP_WEC->PJM
CLTF
0.3780.378
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
19.73919.739
MDUPJM->LTFIMP_MDU
CLTF
0.2940.294
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
8.7418.741
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.7180.718
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
3.6163.616

Details for LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L8014__R-S_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8014__R-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:173.47 %
Rating:1528.0 MVA
Rating Type:B
MVA to Mitigate:2650.62
MW Contribution:124.25
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:CE
Facility Description:
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8014__R-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:173.7 %
Rating:1528.0 MVA
Rating Type:B
MVA to Mitigate:2654.12
MW Contribution:124.24
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
13.34113.341
276174W4-005 E
50/50
75.49175.491
944222AF1-090 E
50/50
29.12629.126
965331AG1-398 C
50/50
0.3180.318
944221AF1-090 C
50/50
6.2216.221
276621X2-022 GEN
50/50
45.66145.661
936772AD2-100 E
50/50
16.44816.448
960141AF2-305_AG1-
50/50
2.532.53
965091AG1-374 C
50/50
74.55274.552
965092AG1-374 E
50/50
49.70249.702
924048AB2-047 E1
50/50
48.10548.105
959341AF2-225 C
50/50
28.08728.087
276655AB2-047 C1
50/50
1.1841.184
274891CAYUG;2U E
50/50
74.66274.662
274864CAYUGA RI;2U
50/50
2.2882.288
936771AD2-100 C
50/50
24.67224.672
290265S-028 E
50/50
67.1867.18
290261S-027 E
50/50
67.59467.594
959342AF2-225 E
50/50
38.78738.787
924049AB2-047 E2
50/50
48.86348.863
274890CAYUG;1U E
50/50
74.66274.662
960261AF2-317 C
50/50
0.6110.611
274880RADFORD R;1U
50/50
2.162.16
960612AF2-352 E
50/50
12.42512.425
939741AE1-205 C
50/50
37.4537.45
942111AE2-223 C
50/50
8.6948.694
917502Z2-087 E
50/50
77.57477.574
274650KINCAID ;1U
50/50
18.59918.599
925772AC1-053 E
50/50
46.28246.282
942481AE2-261 C
50/50
36.29636.296
274854TWINGROVE;U2
50/50
2.4232.423
274863CAYUGA RI;1U
50/50
2.2882.288
936971AD2-131 C
50/50
1.6251.625
965912AG1-460 E
50/50
3.6423.642
957381AF2-032 C
50/50
2.7842.784
924266AB2-070 E
50/50
43.30643.306
959611AF2-252 C
50/50
8.2848.284
270681BRIGHTSTK; R
50/50
1.8941.894
274853TWINGROVE;U1
50/50
2.3552.355
959612AF2-252 E
50/50
12.42512.425
276656AB2-047 C2
50/50
1.1841.184
942112AE2-223 E
50/50
58.1858.18
965911AG1-460 C
50/50
2.4282.428
957382AF2-032 E
50/50
1.311.31
935141AD1-148 C
50/50
1.4531.453
276668AB2-070 C
50/50
1.1691.169
939742AE1-205 E
50/50
51.71651.716
936972AD2-131 E
50/50
8.1658.165
942482AE2-261 E
50/50
24.19724.197
274651KINCAID ;2U
50/50
18.59318.593
925771AC1-053 C
50/50
1.1121.112
960611AF2-352 C
50/50
8.2848.284
991267J1714
External Queue
10.35322666168212910.353226661682129
992572J1022
External Queue
30.7763137817382830.77631378173828
954822J955
External Queue
182.93043518066406182.93043518066406
991037J1464 G
External Queue
87.4724197387695387.47241973876953
956452J1139
External Queue
17.89175987243652317.891759872436523
990353J1289 C
External Queue
3.7197101116180423.719710111618042
956282J1115 C
External Queue
7.6152749061584477.615274906158447
990672J1360
External Queue
57.91892242431640657.918922424316406
956283J1115 E
External Queue
41.20059204101562541.200592041015625
991192J1610 G
External Queue
15.96590614318847715.965906143188477
990354J1289 E
External Queue
20.12458419799804720.124584197998047
990057J1201
External Queue
5.0422406196594245.042240619659424
991197J1626
External Queue
15.52983951568603515.529839515686035
CBM NorthLTFEXP_CBM-N->PJM
CBM
1.0171.017
G-007ALTFEXP_G-007A->PJM
CMTX
1.9791.979
TVALTFEXP_TVA->PJM
CLTF
5.0975.097
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.7950.795
CBM West 2LTFEXP_CBM-W2->PJM
CBM
35.08535.085
VTFLTFEXP_VFT->PJM
CMTX
5.3165.316
MECLTFEXP_MEC->PJM
CLTF
2.4482.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.5361.536
LAGNLTFEXP_LAGN->PJM
CLTF
6.6036.603
CBM South 2LTFEXP_CBM-S2->PJM
CBM
20.57620.576
CPLELTFEXP_CPLE->PJM
CLTF
1.6531.653
SIGELTFEXP_SIGE->PJM
CLTF
0.4480.448

Details for LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:139.62 %
Rating:1364.0 MVA
Rating Type:A
MVA to Mitigate:1904.35
MW Contribution:86.43
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:CE
Facility Description:
LORETTO ; B-AD1-100 TAP 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:139.86 %
Rating:1364.0 MVA
Rating Type:A
MVA to Mitigate:1907.72
MW Contribution:86.43
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
9.4099.409
276174W4-005 E
50/50
52.93852.938
944222AF1-090 E
50/50
20.72920.729
965331AG1-398 C
50/50
0.2230.223
944221AF1-090 C
50/50
4.4284.428
276621X2-022 GEN
50/50
32.20332.203
936772AD2-100 E
50/50
11.69611.696
960141AF2-305_AG1-
50/50
1.7761.776
965091AG1-374 C
50/50
51.8651.86
965092AG1-374 E
50/50
34.57434.574
924048AB2-047 E1
50/50
33.29233.292
959341AF2-225 C
50/50
19.43819.438
276655AB2-047 C1
50/50
0.8190.819
274891CAYUG;2U E
50/50
61.70461.704
274864CAYUGA RI;2U
50/50
1.8911.891
936771AD2-100 C
50/50
17.54317.543
290265S-028 E
50/50
46.73246.732
290261S-027 E
50/50
47.0247.02
959342AF2-225 E
50/50
26.84326.843
924049AB2-047 E2
50/50
33.81633.816
274890CAYUG;1U E
50/50
61.70461.704
960261AF2-317 C
50/50
0.4310.431
274880RADFORD R;1U
50/50
1.5151.515
960612AF2-352 E
50/50
8.6438.643
939741AE1-205 C
50/50
25.91825.918
942111AE2-223 C
50/50
6.0176.017
917502Z2-087 E
50/50
53.68653.686
274650KINCAID ;1U
50/50
13.22113.221
925772AC1-053 E
50/50
32.53332.533
942481AE2-261 C
50/50
25.80225.802
274854TWINGROVE;U2
50/50
1.6851.685
274863CAYUGA RI;1U
50/50
1.8911.891
936971AD2-131 C
50/50
1.1561.156
965912AG1-460 E
50/50
2.5892.589
957381AF2-032 C
50/50
1.9791.979
924266AB2-070 E
50/50
30.39830.398
959611AF2-252 C
50/50
5.7625.762
270681BRIGHTSTK; R
50/50
1.3111.311
274853TWINGROVE;U1
50/50
1.6381.638
959612AF2-252 E
50/50
8.6438.643
276656AB2-047 C2
50/50
0.8190.819
942112AE2-223 E
50/50
40.26540.265
965911AG1-460 C
50/50
1.7261.726
957382AF2-032 E
50/50
0.9310.931
935141AD1-148 C
50/50
1.0251.025
276668AB2-070 C
50/50
0.820.82
939742AE1-205 E
50/50
35.79135.791
936972AD2-131 E
50/50
5.8065.806
942482AE2-261 E
50/50
17.20117.201
274651KINCAID ;2U
50/50
13.21713.217
925771AC1-053 C
50/50
0.7820.782
960611AF2-352 C
50/50
5.7625.762
991267J1714
External Queue
6.9448180198669436.944818019866943
991278J1725 C
External Queue
1.11648941040039061.1164894104003906
991279J1725 E
External Queue
6.0404939651489266.040493965148926
992572J1022
External Queue
20.8600940704345720.86009407043457
954822J955
External Queue
126.01656341552734126.01656341552734
991037J1464 G
External Queue
61.1200218200683661.12002182006836
956452J1139
External Queue
11.79973888397216811.799738883972168
990353J1289 C
External Queue
2.65318965911865232.6531896591186523
956282J1115 C
External Queue
5.2040333747863775.204033374786377
990672J1360
External Queue
39.1722908020019539.17229080200195
956283J1115 E
External Queue
28.15515518188476628.155155181884766
991192J1610 G
External Queue
11.13375091552734411.133750915527344
990354J1289 E
External Queue
14.35443592071533214.354435920715332
990057J1201
External Queue
3.4138562679290773.413856267929077
991197J1626
External Queue
10.41722679138183610.417226791381836
991217J1653
External Queue
10.73547458648681610.735474586486816
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.5230.523
G-007ALTFEXP_G-007A->PJM
CMTX
1.0491.049
TVALTFEXP_TVA->PJM
CLTF
3.73.7
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5260.526
CBM West 2LTFEXP_CBM-W2->PJM
CBM
25.825.8
VTFLTFEXP_VFT->PJM
CMTX
2.8132.813
MECLTFEXP_MEC->PJM
CLTF
3.233.23
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.021.02
LAGNLTFEXP_LAGN->PJM
CLTF
4.9884.988
CBM South 2LTFEXP_CBM-S2->PJM
CBM
13.9613.96
CPLELTFEXP_CPLE->PJM
CLTF
1.0941.094
SIGELTFEXP_SIGE->PJM
CLTF
0.310.31

Details for MCLEAN ; R-PONTIAC ; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L8002___-S_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
MCLEAN ; R-PONTIAC ; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8002___-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:141.56 %
Rating:1726.0 MVA
Rating Type:B
MVA to Mitigate:2443.24
MW Contribution:66.0
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:CE
Facility Description:
MCLEAN ; R-PONTIAC ; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8002___-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:141.71 %
Rating:1726.0 MVA
Rating Type:B
MVA to Mitigate:2445.96
MW Contribution:66.01
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
14.24414.244
276174W4-005 E
50/50
57.357.3
944222AF1-090 E
50/50
27.69227.692
965331AG1-398 C
50/50
0.3580.358
944221AF1-090 C
50/50
5.9155.915
276621X2-022 GEN
50/50
48.75448.754
936772AD2-100 E
50/50
15.56915.569
960141AF2-305_AG1-
50/50
2.8542.854
965091AG1-374 C
50/50
39.59939.599
965092AG1-374 E
50/50
26.39926.399
924048AB2-047 E1
50/50
63.34663.346
959341AF2-225 C
50/50
36.98636.986
276655AB2-047 C1
50/50
1.5591.559
936771AD2-100 C
50/50
23.35423.354
290265S-028 E
50/50
35.68335.683
290261S-027 E
50/50
35.90335.903
959342AF2-225 E
50/50
51.07651.076
924049AB2-047 E2
50/50
64.34464.344
960261AF2-317 C
50/50
0.6530.653
274880RADFORD R;1U
50/50
1.641.64
960612AF2-352 E
50/50
6.66.6
939741AE1-205 C
50/50
49.31449.314
942111AE2-223 C
50/50
11.44811.448
917502Z2-087 E
50/50
102.151102.151
274650KINCAID ;1U
50/50
17.57417.574
925772AC1-053 E
50/50
51.37351.373
942481AE2-261 C
50/50
34.31134.311
274854TWINGROVE;U2
50/50
1.2871.287
936971AD2-131 C
50/50
1.5381.538
965912AG1-460 E
50/50
3.4433.443
957381AF2-032 C
50/50
2.6312.631
924266AB2-070 E
50/50
48.84348.843
959611AF2-252 C
50/50
4.44.4
270681BRIGHTSTK; R
50/50
2.4942.494
934101AD2-000 1
Adder
-4.932941176470588-4.193
274853TWINGROVE;U1
50/50
1.2511.251
959612AF2-252 E
50/50
6.66.6
276656AB2-047 C2
50/50
1.5591.559
942112AE2-223 E
50/50
76.61376.613
965911AG1-460 C
50/50
2.2952.295
957382AF2-032 E
50/50
1.2381.238
935141AD1-148 C
50/50
1.5521.552
276668AB2-070 C
50/50
1.3181.318
939742AE1-205 E
50/50
68.10168.101
936972AD2-131 E
50/50
7.7297.729
942482AE2-261 E
50/50
22.87422.874
274651KINCAID ;2U
50/50
17.54917.549
925771AC1-053 C
50/50
1.2341.234
960611AF2-352 C
50/50
4.44.4
991267J1714
External Queue
10.1913213729858410.19132137298584
992572J1022
External Queue
35.38640975952148435.386409759521484
954822J955
External Queue
174.54541015625174.54541015625
991037J1464 G
External Queue
83.0289993286132883.02899932861328
956452J1139
External Queue
19.09152412414550819.091524124145508
990353J1289 C
External Queue
3.5035326480865483.503532648086548
956282J1115 C
External Queue
6.8979754447937016.897975444793701
990672J1360
External Queue
60.49182510375976660.491825103759766
956283J1115 E
External Queue
37.3198165893554737.31981658935547
991192J1610 G
External Queue
15.35127735137939515.351277351379395
990354J1289 E
External Queue
18.9550094604492218.95500946044922
990057J1201
External Queue
4.9176378250122074.917637825012207
991197J1626
External Queue
15.28698158264160215.286981582641602
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.5861.586
LAGNLTFEXP_LAGN->PJM
CLTF
6.2836.283
CBM South 2LTFEXP_CBM-S2->PJM
CBM
20.85720.857
CPLELTFEXP_CPLE->PJM
CLTF
1.6981.698
SIGELTFEXP_SIGE->PJM
CLTF
0.4520.452
CBM NorthLTFEXP_CBM-N->PJM
CBM
1.1661.166
G-007ALTFEXP_G-007A->PJM
CMTX
2.2462.246
TVALTFEXP_TVA->PJM
CLTF
4.9634.963
MDUPJM->LTFIMP_MDU
CLTF
0.0260.026
CBM West 2LTFEXP_CBM-W2->PJM
CBM
34.21934.219
VTFLTFEXP_VFT->PJM
CMTX
6.0326.032
MECLTFEXP_MEC->PJM
CLTF
1.4531.453
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.8170.817

Details for PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L8014__R-S_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8014__R-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:162.71 %
Rating:1528.0 MVA
Rating Type:B
MVA to Mitigate:2486.15
MW Contribution:124.33
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:CE
Facility Description:
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L8014__R-S_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:162.93 %
Rating:1528.0 MVA
Rating Type:B
MVA to Mitigate:2489.52
MW Contribution:124.31
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
13.35413.354
276174W4-005 E
50/50
75.55275.552
944222AF1-090 E
50/50
29.16529.165
965331AG1-398 C
50/50
0.3180.318
944221AF1-090 C
50/50
6.2296.229
276621X2-022 GEN
50/50
45.70545.705
936772AD2-100 E
50/50
16.46816.468
960141AF2-305_AG1-
50/50
2.5322.532
965091AG1-374 C
50/50
74.59574.595
965092AG1-374 E
50/50
49.7349.73
924048AB2-047 E1
50/50
48.1348.13
959341AF2-225 C
50/50
28.10228.102
276655AB2-047 C1
50/50
1.1851.185
936771AD2-100 C
50/50
24.70224.702
290265S-028 E
50/50
67.21867.218
290261S-027 E
50/50
67.63367.633
959342AF2-225 E
50/50
38.80738.807
924049AB2-047 E2
50/50
48.88848.888
960261AF2-317 C
50/50
0.6120.612
274880RADFORD R;1U
50/50
2.1622.162
960612AF2-352 E
50/50
12.43212.432
939741AE1-205 C
50/50
37.46937.469
942111AE2-223 C
50/50
8.6988.698
917502Z2-087 E
50/50
77.61577.615
274650KINCAID ;1U
50/50
18.62118.621
925772AC1-053 E
50/50
46.32346.323
942481AE2-261 C
50/50
36.33836.338
274854TWINGROVE;U2
50/50
2.4242.424
936971AD2-131 C
50/50
1.6271.627
965912AG1-460 E
50/50
3.6463.646
957381AF2-032 C
50/50
2.7872.787
924266AB2-070 E
50/50
43.34343.343
959611AF2-252 C
50/50
8.2888.288
270681BRIGHTSTK; R
50/50
1.8951.895
274853TWINGROVE;U1
50/50
2.3572.357
959612AF2-252 E
50/50
12.43212.432
276656AB2-047 C2
50/50
1.1851.185
942112AE2-223 E
50/50
58.21158.211
965911AG1-460 C
50/50
2.4312.431
957382AF2-032 E
50/50
1.3121.312
935141AD1-148 C
50/50
1.4551.455
276668AB2-070 C
50/50
1.171.17
939742AE1-205 E
50/50
51.74351.743
936972AD2-131 E
50/50
8.1758.175
942482AE2-261 E
50/50
24.22524.225
274651KINCAID ;2U
50/50
18.61518.615
925771AC1-053 C
50/50
1.1131.113
960611AF2-352 C
50/50
8.2888.288
991267J1714
External Queue
10.35322666168212910.353226661682129
991278J1725 C
External Queue
1.4680987596511841.468098759651184
991279J1725 E
External Queue
7.9427909851074227.942790985107422
992572J1022
External Queue
30.7763137817382830.77631378173828
954822J955
External Queue
182.93043518066406182.93043518066406
991037J1464 G
External Queue
87.4724197387695387.47241973876953
956452J1139
External Queue
17.89175987243652317.891759872436523
990353J1289 C
External Queue
3.7197101116180423.719710111618042
956282J1115 C
External Queue
7.6152749061584477.615274906158447
990672J1360
External Queue
57.91892242431640657.918922424316406
956283J1115 E
External Queue
41.20059204101562541.200592041015625
991192J1610 G
External Queue
15.96590614318847715.965906143188477
990354J1289 E
External Queue
20.12458419799804720.124584197998047
990057J1201
External Queue
5.0422406196594245.042240619659424
991197J1626
External Queue
15.52983951568603515.529839515686035
991217J1653
External Queue
14.11633396148681614.116333961486816
CBM South 2LTFEXP_CBM-S2->PJM
CBM
20.81620.816
CPLELTFEXP_CPLE->PJM
CLTF
1.6751.675
SIGELTFEXP_SIGE->PJM
CLTF
0.450.45
CBM NorthLTFEXP_CBM-N->PJM
CBM
1.0471.047
G-007ALTFEXP_G-007A->PJM
CMTX
2.0362.036
TVALTFEXP_TVA->PJM
CLTF
5.135.13
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.8050.805
CBM West 2LTFEXP_CBM-W2->PJM
CBM
35.23835.238
VTFLTFEXP_VFT->PJM
CMTX
5.4675.467
MECLTFEXP_MEC->PJM
CLTF
2.4852.485
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.551.55
LAGNLTFEXP_LAGN->PJM
CLTF
6.6446.644

Details for PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:130.92 %
Rating:1334.0 MVA
Rating Type:A
MVA to Mitigate:1746.46
MW Contribution:86.5
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:CE
Facility Description:
PONTIAC ; B-LORETTO ; B 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:131.17 %
Rating:1334.0 MVA
Rating Type:A
MVA to Mitigate:1749.77
MW Contribution:86.5
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
9.4219.421
276174W4-005 E
50/50
52.99952.999
944222AF1-090 E
50/50
20.76820.768
965331AG1-398 C
50/50
0.2230.223
944221AF1-090 C
50/50
4.4364.436
276621X2-022 GEN
50/50
32.24632.246
936772AD2-100 E
50/50
11.71511.715
960141AF2-305_AG1-
50/50
1.7781.778
965091AG1-374 C
50/50
51.90351.903
965092AG1-374 E
50/50
34.60234.602
924048AB2-047 E1
50/50
33.31733.317
959341AF2-225 C
50/50
19.45319.453
276655AB2-047 C1
50/50
0.820.82
936771AD2-100 C
50/50
17.57317.573
290265S-028 E
50/50
46.7746.77
290261S-027 E
50/50
47.05847.058
959342AF2-225 E
50/50
26.86426.864
924049AB2-047 E2
50/50
33.84233.842
960261AF2-317 C
50/50
0.4320.432
274880RADFORD R;1U
50/50
1.5171.517
960612AF2-352 E
50/50
8.658.65
939741AE1-205 C
50/50
25.93725.937
942111AE2-223 C
50/50
6.0216.021
917502Z2-087 E
50/50
53.72753.727
274650KINCAID ;1U
50/50
13.24213.242
925772AC1-053 E
50/50
32.57332.573
942481AE2-261 C
50/50
25.84425.844
274854TWINGROVE;U2
50/50
1.6871.687
936971AD2-131 C
50/50
1.1581.158
965912AG1-460 E
50/50
2.5932.593
957381AF2-032 C
50/50
1.9821.982
924266AB2-070 E
50/50
30.43530.435
959611AF2-252 C
50/50
5.7675.767
270681BRIGHTSTK; R
50/50
1.3121.312
274853TWINGROVE;U1
50/50
1.641.64
959612AF2-252 E
50/50
8.658.65
276656AB2-047 C2
50/50
0.820.82
942112AE2-223 E
50/50
40.29540.295
965911AG1-460 C
50/50
1.7291.729
957382AF2-032 E
50/50
0.9330.933
935141AD1-148 C
50/50
1.0261.026
276668AB2-070 C
50/50
0.8210.821
939742AE1-205 E
50/50
35.81835.818
936972AD2-131 E
50/50
5.8165.816
942482AE2-261 E
50/50
17.22917.229
274651KINCAID ;2U
50/50
13.23813.238
925771AC1-053 C
50/50
0.7830.783
960611AF2-352 C
50/50
5.7675.767
991267J1714
External Queue
6.9448180198669436.944818019866943
991278J1725 C
External Queue
1.11648941040039061.1164894104003906
991279J1725 E
External Queue
6.0404939651489266.040493965148926
992572J1022
External Queue
20.8600940704345720.86009407043457
954822J955
External Queue
126.01656341552734126.01656341552734
991037J1464 G
External Queue
61.1200218200683661.12002182006836
956452J1139
External Queue
11.79973888397216811.799738883972168
990353J1289 C
External Queue
2.65318965911865232.6531896591186523
956282J1115 C
External Queue
5.2040333747863775.204033374786377
990672J1360
External Queue
39.1722908020019539.17229080200195
956283J1115 E
External Queue
28.15515518188476628.155155181884766
991192J1610 G
External Queue
11.13375091552734411.133750915527344
990354J1289 E
External Queue
14.35443592071533214.354435920715332
990057J1201
External Queue
3.4138562679290773.413856267929077
991197J1626
External Queue
10.41722679138183610.417226791381836
991217J1653
External Queue
10.73547458648681610.735474586486816
CBM West 2LTFEXP_CBM-W2->PJM
CBM
25.95325.953
VTFLTFEXP_VFT->PJM
CMTX
2.9652.965
MECLTFEXP_MEC->PJM
CLTF
3.2673.267
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.0341.034
LAGNLTFEXP_LAGN->PJM
CLTF
5.0295.029
CBM South 2LTFEXP_CBM-S2->PJM
CBM
14.214.2
CPLELTFEXP_CPLE->PJM
CLTF
1.1161.116
SIGELTFEXP_SIGE->PJM
CLTF
0.3120.312
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.5540.554
G-007ALTFEXP_G-007A->PJM
CMTX
1.1051.105
TVALTFEXP_TVA->PJM
CLTF
3.7323.732
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.5360.536

Details for PONTIAC ; R-DRESDEN ; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L11212_B-S_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:CE
Facility Description:
PONTIAC ; R-DRESDEN ; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L11212_B-S_SRT-A-2
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:139.52 %
Rating:1656.0 MVA
Rating Type:B
MVA to Mitigate:2310.44
MW Contribution:111.08
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:CE
Facility Description:
PONTIAC ; R-DRESDEN ; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L11212_B-S_SRT-A-2
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:139.45 %
Rating:1656.0 MVA
Rating Type:B
MVA to Mitigate:2309.22
MW Contribution:111.06
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
276615W2-048 GEN
50/50
11.77211.772
276174W4-005 E
50/50
66.97466.974
944222AF1-090 E
50/50
25.47425.474
965331AG1-398 C
50/50
0.2820.282
944221AF1-090 C
50/50
5.4415.441
276621X2-022 GEN
50/50
40.2940.29
936772AD2-100 E
50/50
14.39814.398
960141AF2-305_AG1-
50/50
2.2432.243
965091AG1-374 C
50/50
66.64566.645
965092AG1-374 E
50/50
44.4344.43
924048AB2-047 E1
50/50
43.20843.208
959341AF2-225 C
50/50
25.22825.228
276655AB2-047 C1
50/50
1.0641.064
274891CAYUG;2U E
50/50
55.00655.006
274864CAYUGA RI;2U
50/50
1.6851.685
936771AD2-100 C
50/50
21.59721.597
290265S-028 E
50/50
60.05560.055
290261S-027 E
50/50
60.42560.425
959342AF2-225 E
50/50
34.83934.839
924049AB2-047 E2
50/50
43.88943.889
274890CAYUG;1U E
50/50
55.00655.006
960261AF2-317 C
50/50
0.5390.539
274880RADFORD R;1U
50/50
1.9171.917
960612AF2-352 E
50/50
11.10811.108
939741AE1-205 C
50/50
33.63733.637
942111AE2-223 C
50/50
7.8097.809
917502Z2-087 E
50/50
69.67869.678
274650KINCAID ;1U
50/50
16.28716.287
925772AC1-053 E
50/50
40.96740.967
942481AE2-261 C
50/50
31.78131.781
274854TWINGROVE;U2
50/50
2.1662.166
274863CAYUGA RI;1U
50/50
1.6851.685
936971AD2-131 C
50/50
1.4231.423
965912AG1-460 E
50/50
3.1893.189
957381AF2-032 C
50/50
2.4382.438
924266AB2-070 E
50/50
38.38438.384
959611AF2-252 C
50/50
7.4057.405
270681BRIGHTSTK; R
50/50
1.7011.701
934101AD2-000 1
Adder
-6.687058823529412-5.684
274853TWINGROVE;U1
50/50
2.1062.106
959612AF2-252 E
50/50
11.10811.108
276656AB2-047 C2
50/50
1.0641.064
942112AE2-223 E
50/50
52.25852.258
965911AG1-460 C
50/50
2.1262.126
957382AF2-032 E
50/50
1.1471.147
935141AD1-148 C
50/50
1.2821.282
276668AB2-070 C
50/50
1.0361.036
939742AE1-205 E
50/50
46.45246.452
936972AD2-131 E
50/50
7.1487.148
942482AE2-261 E
50/50
21.18721.187
274651KINCAID ;2U
50/50
16.28116.281
925771AC1-053 C
50/50
0.9840.984
960611AF2-352 C
50/50
7.4057.405
991267J1714
External Queue
9.5641126632690439.564112663269043
992572J1022
External Queue
28.17133712768554728.171337127685547
954822J955
External Queue
165.01107788085938165.01107788085938
991037J1464 G
External Queue
77.8676147460937577.86761474609375
956452J1139
External Queue
16.77061462402343816.770614624023438
990353J1289 C
External Queue
3.24625945091247563.2462594509124756
956282J1115 C
External Queue
6.91972112655639656.9197211265563965
990672J1360
External Queue
53.1186676025390653.11866760253906
956283J1115 E
External Queue
37.4374656677246137.43746566772461
991192J1610 G
External Queue
14.23944854736328114.239448547363281
990354J1289 E
External Queue
17.5630970001220717.56309700012207
990057J1201
External Queue
4.6199717521667484.619971752166748
991197J1626
External Queue
14.34616947174072314.346169471740723
CBM South 2LTFEXP_CBM-S2->PJM
CBM
18.81818.818
CPLELTFEXP_CPLE->PJM
CLTF
1.5441.544
SIGELTFEXP_SIGE->PJM
CLTF
0.4020.402
CBM NorthLTFEXP_CBM-N->PJM
CBM
1.131.13
G-007ALTFEXP_G-007A->PJM
CMTX
2.1642.164
TVALTFEXP_TVA->PJM
CLTF
4.3714.371
MDUPJM->LTFIMP_MDU
CLTF
0.0880.088
CBM West 2LTFEXP_CBM-W2->PJM
CBM
29.68829.688
VTFLTFEXP_VFT->PJM
CMTX
5.8145.814
MECLTFEXP_MEC->PJM
CLTF
0.3530.353
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.7430.743
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
LGEELTFEXP_LGEE->PJM
CLTF
1.4321.432
LAGNLTFEXP_LAGN->PJM
CLTF
5.4285.428
CONTINGENCY 'COMED_P1-2_345-L8002___-S_SRT-A'
 TRIP BRANCH FROM BUS 270852 TO BUS 270668 CKT 1   /*PONTIAC  ; B 345.0 - BLUEMOUND; B 345.0
END
CONTINGENCY '765-L11216__-S_SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
END
CONTINGENCY 'EXT_347945 7PANA 345 347955 7AUSTIN 345 1 _SRT-S'
 OPEN BRANCH FROM BUS 347945 TO BUS 347955 CKT 1   /*7PANA        345.0 - 7AUSTIN      345.0
END
CONTINGENCY 'COMED_P1-2_345-L8001___-S_SRT-A'
 TRIP BRANCH FROM BUS 270853 TO BUS 270819 CKT 1   /*PONTIAC  ; R 345.0 - MCLEAN ; R   345.0
END
CONTINGENCY 'COMED_P1-2_345-L2105___-S_SRT-A-4'
 TRIP BRANCH FROM BUS 944220 TO BUS 347945 CKT 1   /*AF1-090 TP   345.0 - 7PANA        345.0
END
CONTINGENCY 'COMED_P1-2_345-L8014__R-S_SRT-A'
 TRIP BRANCH FROM BUS 270853 TO BUS 270717 CKT 1   /*PONTIAC  ; R 345.0 - DRESDEN  ; R 345.0
END
CONTINGENCY 'COMED_P1-2_345-L11212_B-S_SRT-A-2'
 TRIP BRANCH FROM BUS 934720 TO BUS 270704 CKT 1   /*AD1-100 TAP  345.0 - LORETTO  ; B 345.0
END
348847 to 270819 ckt 1
934720 to 270926 ckt 1
936770 to 944220 ckt 1
944220 to 347945 ckt 1
270668 to 270852 ckt 1
270796 to 347955 ckt 1
270704 to 934720 ckt 1
270819 to 270853 ckt 1
270852 to 270704 ckt 1
270853 to 270717 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Light Load Analysis

The New Service Request AG1-374 was evaluated as a 300.0 MW injection in the ComEd area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Light Load Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Short Circuit Analysis

Based on PJM’s Short Circuit Analysis, this project did not contribute >1% fault duty to previously identified overdutied breakers, nor did it cause any new overdutied breakers.

Stability Analysis

Analysis Complete - No Issues

Executive Summary

New Service Requests (projects) in PJM Transition Cycle 1, Cluster 21 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 21 projects.

This analysis is effectively a screening study to determine whether the addition of the Cluster 21 projects will meet the dynamics requirements of the NERC, ComEd and PJM reliability standards.

The load flow scenario for the analysis was based on the RTEP 2027 summer peak load case, modified to include applicable projects. Cluster 21 projects have been dispatched online at maximum power output, with 1.0 voltage at the terminal bus.

Cluster 21 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. Steady-state condition and 39 contingencies were studied, each with a 20 second simulation time period. Studied faults included:

  1. Steady-state operation (20 second run),
  2. Three-phase faults with normal clearing time,
  3. Three-phase faults with single-phase delayed clearing due to a stuck breaker (IPO breaker with FD Logic),
  4. Three-phase faults with three-phase delayed clearing due to a stuck breaker (GO breakers with FD Logic).

No relevant high-speed reclosing (HSR) contingencies nor single-phase bus faults were identified for this study.

There are no delayed (Zone 2) clearing faults due to dual primary relays being employed in the ComEd 345 kV transmission system.

For all simulations, the queue project under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance.

For all of the fault contingencies tested on the 2027 peak load case:

  1. Cluster 21 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),
  2. The system with Cluster 21 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.
  3. Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus).
  4. No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

AG1-374 meets the 0.95 leading and lagging PF requirement.

 

 

 

The AE1-205 unit tripped by undervoltage relays for 4 contingencies (P4.23, P4.24, P4.25, and P4.26). Contingencies P4.23, P4.24, P4.25, and P4.26 involved a three-phase stuck breaker fault at Pontiac Midpoint 345 kV clearing in 13 cycles. As per NERC Standard PRC-024 requirements, these contingencies were found to meet the corresponding NERC PRC-024 LVRT criteria. A similar tripping issue was observed in AF2-252/AF2-352 dynamic study.

 

Fictitious post-fault overvoltage tripping at AF2-252 and AF2-352 generator buses tripped the queue projects due to the action of instantaneous over-voltage relays for contingencies P1.02, P1.03, P4.10, P4.25 and P4.26. Therefore, the relay pickup times for voltage relay instances 96061504 and 95961504 were set to 0.0305 seconds to avoid fictitious voltage tripping of the units. With this updated relay settings only P1.03 was tripping. Both relay instances have been updated to 0.035 seconds to avoid this tripping.

 

The IPCMD and IQCMD states in the REGCAU model of AG1-374 GEN showed erratic behavior for some contingencies in which these generators have been disconnected as part of the contingency event. Since the machine is disconnected and no active or reactive power is injected into the system, this behavior is likely fictitious and a limitation of the software. This does not cause instability in the system.

 

The composite short-circuit ratio (CSCR) assessment was performed for inverter-based renewable generation units which are within one (1) substation away from Cluster 21. The CSCR results are summarized in Table 8 through Table 11 and revealed a minimum and maximum CSCR values of 3.11 for P4.15, P4.16, P4.19 and P4.20 and 7.02 for P1.04, respectively.

 

No mitigations were found to be required.

Table 1: TC1 Cluster 21 Projects

Cluster

Project

Fuel Type

Transmission Owner

MFO

MWE

MWC

Point of Interconnection

21

AG1-374

Solar

ComEd

300

300

180

Blue Mound 345 kV

 

 

Reactive Power Analysis

The reactive power capability of AG1-374 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AB1-006Meadow Lake 345kVIn Service
AB1-080Dumont-Olive 345kVIn Service
AB1-087Sullivan 345kV #1Under Construction
AB1-088Sullivan 345kV #2Engineering & Procurement
AB2-047Brokaw-Pontiac MidpointIn Service
AB2-070Mt. Pulaski-BrokawIn Service
AC1-053Lanesville-BrokawIn Service
AC1-168Kewanee-StreatorSuspended
AC2-154Davis Creek 138kVEngineering & Procurement
AC2-157Sullivan 345 kVPartially in Service - Under Construction
AD1-013Twombly Road 138kVEngineering & Procurement
AD2-047Davis Creek 138 kVSuspended
AD2-060Davis Creek 138kVEngineering & Procurement
AD2-066Mazon-Crescent Ridge 138 kVUnder Construction
AD2-100Kincaid-Pana 345 kVSuspended
AD2-131Kincaid-Pana 345kVSuspended
AE1-113Mole Creek 345 kVUnder Construction
AE1-163Powerton-Nevada 345 kVUnder Construction
AE1-166Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kVEngineering & Procurement
AE1-170Kenzie Creek-Colby 138 kVSuspended
AE1-205McLean 345 kVEngineering & Procurement
AE2-045Olive-Reynolds 345 kVEngineering & Procurement
AE2-152Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kVEngineering & Procurement
AE2-223McLean 345 kVEngineering & Procurement
AE2-255Molecreek 345 kVUnder Construction
AE2-261Kincaid-Pana 345 kVEngineering & Procurement
AE2-267Woodsdale 345 kVEngineering & Procurement
AE2-276Sullivan 345kVEngineering & Procurement
AE2-281Powerton-Nevada 345 kVUnder Construction
AE2-341Sandwich-Plano 138 kVEngineering & Procurement
AF1-030Sandwich-Plano 138 kVEngineering & Procurement
AF1-090Kincaid-PanaEngineering & Procurement
AF1-204Eugene 345 kVEngineering & Procurement
AF1-207Reynolds-Olive #1 345 kVEngineering & Procurement
AF1-215Olive-Reynolds 345 kVIn Service
AF1-322Meadow Lake 345 kVEngineering & Procurement
AF1-331Twombley RoadEngineering & Procurement
AF2-027Zion Energy Center 345 kVEngineering & Procurement
AF2-031CalumetEngineering & Procurement
AF2-032Kincaid 345 kVWithdrawn
AF2-078Reynolds-Olive #1 345 kVEngineering & Procurement
AF2-083Kenzie Creek-Stone Lake 69 kVUnder Construction
AF2-095Davis Creek 138 kVEngineering & Procurement
AF2-132Reynolds-Olive #1 345 kVUnder Construction
AF2-133Reynolds-Olive #2 345 kVUnder Construction
AF2-134Olive-Reynolds #2 345 kVIn Service
AF2-142Nevada 345 kVEngineering & Procurement
AF2-143Powerton-Nevada 345 kVEngineering & Procurement
AF2-205Olive-Reynolds #2 345 kVEngineering & Procurement
AF2-225McLean 345 kVEngineering & Procurement
AF2-226Katydid Road 345 kVEngineering & Procurement
AF2-252Blue Mound 345 kVEngineering & Procurement
AF2-305Brokaw-Lanesville 345 kVIn Service
AF2-319Katydid Road 345 kVEngineering & Procurement
AF2-350Kensington 138 kVEngineering & Procurement
AF2-352Blue Mound 345 kVEngineering & Procurement
AF2-359Olive-University Park 345 kVEngineering & Procurement
AF2-366Crego Rd 138 kVEngineering & Procurement
AF2-441Burnham 138kVEngineering & Procurement
AG1-118Sugar Grove-Waterman 138kVEngineering & Procurement
AG1-127Crego Rd 138 kVEngineering & Procurement
AG1-226Dequine-Eugene 345 kVEngineering & Procurement
AG1-237Dequine-Eugene 345 kVEngineering & Procurement
AG1-302Olive-Reynolds #1 345 kVUnder Construction
AG1-349Olive-Reynolds #2 345 kVEngineering & Procurement
AG1-436Olive-University Park 345 kVEngineering & Procurement
AG1-447Olive-University Park 345 kVEngineering & Procurement
AG1-460Kincaid-Pana 345 kVEngineering & Procurement
AG1-478Wilmington 34.5 kVEngineering & Procurement
AG1-513Aurora 138 kVSuspended
AG1-555Dequine 345 kVEngineering & Procurement
W2-048Brokaw-LanesvilleIn Service
W4-005Blue Mound-LathamIn Service
X2-022Brokaw-LanesvilleIn Service
Y1-054Rochelle 138kVIn Service
Z2-087Pontiac MidPoint-Brokaw 345kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)Identified Impacts
AG1-374 System Reinforcements:
TOTrans Owner IDTitleCategoryAllocated Cost ($USD)
DEIDEI_TC1_16079Reconductor Eugene to Cayuga 345kV #1 line with 4000A conductor.Cost Allocated$1,210,019
Grand Total:$1,210,019

System Reinforcement
Type
Load Flow
TO
DEI
RTEP ID / TO ID
(Pending) / DEI_TC1_16079
Title
Reconductor Eugene to Cayuga 345kV #1 line with 4000A conductor.
Description
Reconductor Eugene to Cayuga 345kV #1 line with 4000A conductor. Projected in-service date is 6/1/2030.
Total Cost ($USD)
$23,213,515
Allocated Cost ($USD)
$1,210,019
Time Estimate
48 Months

Contributor

FacilityContingency
05EUGENE-08CAYSUB 345.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A2262.0 MVA
(All)B2262.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AE2-223 McLean 345kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-223, AF2-225
11.4 MW2.5%$586,216
AE2-261 Kincaid Pana Tap - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-261, AG1-460
26.3 MW5.9%$1,358,664
AF1-204135.5 MW30.1%$6,994,424
AF2-225 McLean 345kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-223, AF2-225
11.4 MW2.5%$586,216
AG1-226239.0 MW53.2%$12,341,670
AG1-37423.4 MW5.2%$1,210,019
AG1-460 Kincaid Pana Tap - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-261, AG1-460
2.6 MW0.6%$136,305

New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In coordination with other Affected System Operators, PJM has determined that the Affected System Operator for this project that requires an Affected System Study. For the latest Affected System Study results pertaining this project, please refer to your Affected System Study report by the Affected System Operator. If the Affected System Operator identified the need for a system reinforcement on their system due to their planning criteria, Project Developer must follow the Affected System Operator Tariff for construction of the network upgrade. PJM lists any required network upgrades identified by the Affected System Operator in the PJM Project Developer’s GIA under Schedule F.

Midcontinent Independent System Operator, Inc. (MISO) Identified Impacts
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Final System Impact Study analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AG1-374 System Reinforcements:
TORTEP IDTitleCategoryAllocated Cost ($USD)Facilities Study
ComEdn9195.0Install a new 345 kV circuit breaker at Station 12 Dresden.Cost Allocated$1,285,183
AEPb3775.11Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating.Contingent$0N/A
AEPb3775.6Perform sag study mitigation work on the Dumont-Stillwell 345 kV lineContingent$0N/A
AEPb3775.7Upgrade breakers at Dumont substation on the Stillwell-Dumont 345 kV line.Contingent$0N/A
ComEdb3775.1Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV lineContingent$0N/A
ComEdb3775.3Rebuild ComEd’s section of 345 kV double circuit in IL from St. John to CreteContingent$0N/A
ComEds3011Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration.Contingent$0N/A
ComEdb3775.4Rebuild 345 kV double circuit extending from Crete to E. Frankfort.Contingent$0N/A
Grand Total:$1,285,183

PJM evaluated the impact of topology changing reinforcements to mitigate the impacts driven by New Service Requests. PJM determined which reinforcements were eliminated as a result of modeling the topology changing reinforcements. PJM then grouped the topology changing and eliminated reinforcements by region and computed a discount factor to apply to reinforcements to reduce the cost of all these reinforcements down to the cost of contstructing only the topology changing reinforcements. For additional details, please click the icon below

Regional Topology Upgrade Conversion

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n9195.0
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n9195.0 / CE_NUN_STA12_345 NEW CB
Title
Install a new 345 kV circuit breaker at Station 12 Dresden.
Description
• Upgrade the existing substation STA 12 Dresden by adding 345kV BT 14-15 circuit breaker and associated disconnect switches. • Upgrade relay & protection at 345kV substation STA 12 Dresden to support installation of 345kV BT 14-15
Total Cost ($USD)
$3,357,627
Discounted Total Cost ($USD)
$3,357,627
Allocated Cost ($USD)
$1,285,183
Time Estimate
Dec 15 2030

Contributor

FacilityContingency
(Any)COMED_P4_012-45-BT14-15_SRT-A
No new ratings for this Flowgate.
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AE2-223 McLean 345kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-223, AF2-225
133.8 MW20.6%$691,648
AE2-261 Kincaid Pana Tap - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-261, AG1-460
121.2 MW18.7%$626,303
AF2-225 McLean 345kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-223, AF2-225
133.8 MW20.6%$691,648
AG1-374248.6 MW38.3%$1,285,183
AG1-460 Kincaid Pana Tap - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-261, AG1-460
12.2 MW1.9%$62,843

System Reinforcement: b3775.11
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b3775.11 / b3775.7a
Title
Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating.
Description
Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating.
Cost Information
Time Estimate
Dec 01 2026

Contingent

Note: Although AG1-374 may not presently have cost responsibility for this upgrade, AG1-374 may need this upgrade in-service to be deliverable to the PJM system. If AG1-374 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A1409.0 MVA
(All)B1737.0 MVA

System Reinforcement: b3775.6
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b3775.6
Title
Perform sag study mitigation work on the Dumont-Stillwell 345 kV line
Description
Perform sag study mitigation work on the Dumont-Stillwell 345 kV line (remove a center-pivot irrigation system from under the line, allowing for the normal and emergency ratings of the line to increase, replace two structures and modify a third structure).
Cost Information
Time Estimate
Nov 20 2026

Contingent

Note: Although AG1-374 may not presently have cost responsibility for this upgrade, AG1-374 may need this upgrade in-service to be deliverable to the PJM system. If AG1-374 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A1409.0 MVA
(All)B1718.0 MVA

System Reinforcement: b3775.7
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b3775.7 / b3775.7b
Title
Upgrade breakers at Dumont substation on the Stillwell-Dumont 345 kV line.
Description
Upgrade the limiting element at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating. This includes replacement of breakers F and F1.
Cost Information
Time Estimate
Dec 01 2026

Contingent

Note: Although AG1-374 may not presently have cost responsibility for this upgrade, AG1-374 may need this upgrade in-service to be deliverable to the PJM system. If AG1-374 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A1408.0 MVA
(All)B1887.0 MVA

System Reinforcement
Type
Load Flow
TO
AEP
RTEP ID / TO ID
(Pending) / AEP_TC1_13727
Title
AEP SE rating is 1868 MVA
Description
AEP SE rating is 1868 MVA
Total Cost ($USD)
$0
Discounted Total Cost ($USD)
$0
Allocated Cost ($USD)
$0
Time Estimate
0 to 1 Months

Note: This reinforcement is fictitious and will not be cost allocated to projects. It is listed for information purposes only.

FacilityContingency
05EUGENE-08CAYSUB 345.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)B1868.0 MVA

System Reinforcement: b3775.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.1
Title
Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line
Description
Outside of the Green Acres substation, swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line to the University Park N-Olive 345 kV line to create a University Park N-Green Acres-Olive and St. John-Olive 345 kV lines.
Cost Information
Time Estimate
Mar 30 2027

Contingent

Note: Although AG1-374 may not presently have cost responsibility for this upgrade, AG1-374 may need this upgrade in-service to be deliverable to the PJM system. If AG1-374 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)ALDR9999.0 MVA
(All)STE9999.0 MVA

System Reinforcement: b3775.2
Type
Load Flow
TO
NextEra
RTEP ID / TO ID
b3775.2
Title
Reconductor NEET’s section of Crete(IN/IL border)-St. John 345 kV line (6.95 miles).
Description
Reconductor NEET’s section of Crete(IN/IL border)-St. John 345 kV line (6.95 miles).
Cost Information
Time Estimate
May 09 2023

Not Contingent

Note: AG1-374 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG1-374 is not contingent on this baseline upgrade as it is already in-service.

FacilityContingency
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A1679.0 MVA
(All)B2058.0 MVA
(All)C2280.0 MVA
(All)STE2107.0 MVA

System Reinforcement: b3775.3
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.3
Title
Rebuild ComEd’s section of 345 kV double circuit in IL from St. John to Crete
Description
Part of b3775 baseline. Rebuild ComEd’s section of 345 kV double circuit in IL from St. John to Crete (5 miles) with twin bundled 1277 ACAR conductor.
Cost Information
Time Estimate
Dec 01 2026

Contingent

Note: Although AG1-374 may not presently have cost responsibility for this upgrade, AG1-374 may need this upgrade in-service to be deliverable to the PJM system. If AG1-374 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A1679.0 MVA
(All)B2058.0 MVA
(All)C2280.0 MVA
(All)STE2107.0 MVA

System Reinforcement: s3011
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
s3011 / CE_S3011
Title
Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration.
Description
Replace 345 kV open air straight bus with GIS in a breaker and half configuration (34 Circuit Breakers) at Goodings Grove with 80kA capability.
Cost Information
Time Estimate
Dec 31 2029

Contingent

Note: Although AG1-374 may not presently have cost responsibility for this upgrade, AG1-374 may need this upgrade in-service to be deliverable to the PJM system. If AG1-374 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
(Any)COMED_P4_112-45-BT4-5___SRT-A
No new ratings for this Flowgate.

System Reinforcement: n6840
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n6840 / CE_NUN_Sta. 12 Dresden
Title
Install a new 345kV bus tie circuit breaker at Station 12 Dresden
Description
For Dresden stuck breaker (COMED_P4_012-45-BT12-14): The upgrade will be to install a new 345kV bus tie circuit breaker at Station 12 Dresden. The new 345kV breaker will be installed as BT CB 12-13. The ratings for L11212 will not change rather the contingency as stated above will be revised.
Total Cost ($USD)
$0
Discounted Total Cost ($USD)
$0
Allocated Cost ($USD)
$0
Time Estimate
Dec 18 2024

Not Contingent

Note: Based on PJM cost allocation criteria, AG1-374 does not receive cost allocation towards this upgrade which is already in-service.

FacilityContingency
(Any)COMED_P4_012-45-BT12-14_SRT-A
No new ratings for this Flowgate.

System Reinforcement: b3775.4
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.4 / CE_B3775.4
Title
Rebuild 345 kV double circuit extending from Crete to E. Frankfort.
Description
Part of b3775 baseline. Rebuild 12.7 miles of 345 kV double circuit extending from Crete to E. Frankfort with twin bundled 1277 ACAR conductor.
Cost Information
Time Estimate
Jun 01 2026

Contingent

Note: Although AG1-374 may not presently have cost responsibility for this upgrade, AG1-374 may need this upgrade in-service to be deliverable to the PJM system. If AG1-374 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
(Any)765-L11215__-S_SRT-A
No new ratings for this Flowgate.

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AG1-374


AG1-374 Contributions into Topology or Eliminated Reinforcements:
TypeTORTEP ID / TO IDTitleTopo or ElimMW ImpactPercent AllocationCategoryAllocated Cost ($USD)
Contributions into Topology or Eliminated Reinforcement Total:$0
AG1-374 Contingent Region Topology Upgrades:
TORTEP IDTitleCategoryAllocated Cost ($USD)
Region Topology Upgrade Total:$0

Attachments

AG1-374 One Line Diagram

AG1-374 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.