AG1-378 Final System Impact Study (Retool 2) Report

v2.00 released 2026-05-14 11:56

Philipsburg 115 kV

6.0 MW Capacity / 20.0 MW Energy

Introduction

This Final System Impact Study (SIS) Report has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 314 for New Service Requests (projects) in Transition Cycle 1 (TC1). The Project Developer/Eligible Customer (developer) is CE-Black Moshannon OZ LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Mid-Atlantic Interstate Transmission, LLC.

Preface

The Final System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Final System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 5, Final Agreement Negotiation Phase, the purpose of the Final Agreement Negotiation Phase is to:

  1. Negotiate, execute and enter into the applicable final interconnection related service agreement found in Tariff, Part IX;
  2. Conduct any remaining analyses or updated analyses based on New Service Requests withdrawn during Decision Point III (DP3); and
  3. Adjust the security obligation based on New Service Requests withdrawn during Decision Point III and/or during the Final Agreement Negotiation Phase.
Retool 1:

In accordance with PJM Tariff Part VII.D 314 B(1)(a), Final Agreement Negotiation Phase:

  • PJM will perform a retool (Retool 1) after the conclusion of DP3 considering only the projects moving on in the Final Agreement Negotiation Phase (Removes DP3 withdrawals).
  • The Final System Impact Study reflecting results from the retooled analysis (Retool 1) will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • PJM will provide updated final electronic agreements to Project Developers and Eligible Customers in the Cycle reflecting updates from the Final System Impact Study after Retool 1 including the adjusted Security requirements.

The AG1-378 Final System Impact Study (Retool 1) Report is available for download here.

Retool 2 (if needed):

If particular New Service Requests do not sign their final agreements after receiving the updated information after Retool 1, there may be the need to run a second retool (Retool 2) to identify if any network upgrades are no longer necessary:

  • PJM will perform Retool 2 (if necessary) considering only the removal of projects from the model which chose not to execute their agreements after Retool 1.
  • The updated Final System Impact Study reflecting results from Retool 2 will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • If there are any adjustments to the agreements required after Retool 2, the necessary network upgrade or Security changes will be handled via the scope change process post-GIA.

General

The Project Developer has proposed an uprate to a planned/existing Solar/Storage facility located in the Mid-Atlantic Interstate Transmission, LLC zone — Centre County, Pennsylvania. This project is an increase to the developer’s AG1-090/AG1-377 project(s), which will share the same Point of Interconnection. The AG1-378 project is a 20.0 MW uprate (6.0 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 135.0 MW with 42.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG1-378
Project Name:
Philipsburg 115 kV
Project Developer Name:
CE-Black Moshannon OZ LLC
State:
Pennsylvania
County:
Centre
Transmission Owner:
Mid-Atlantic Interstate Transmission, LLC
MFO:
135.0
MWE:
20.0
MWC:
6.0
Fuel Type:
Solar
Basecase Study Year:
2027

Physical Interconnection Facility Study

Received

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

The interconnection of the project at the Primary POI will be accomplished by installing one 115 kV breaker at Philipsburg Substation to expand the station from a four breaker to a five breaker ring bus. AG1-090, AG1-377, and AG1-378 are behind the same POI. All three projects are in Transition Cycle 1 and will share costs for the required Transmission Owner Interconnection Facilities and physical interconnection network upgrades.

Attachment 1 shows a one-line diagram of the proposed interconnection facilities for the AG1-378 generation project to connect to the transmission system.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. The Facilities Studies for the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades were performed by the Transmission Owner in Phase II. Facilities Studies are available for download on PJM.com (see General Section for document links). The Interconnected Transmission Owner has performed a Facilities Study for the required System Reliability Network Upgrades in Phase III (see System Reinforcement Section for document links).

Based on the Final SIS results, the AG1-378 project has the following allocation of costs for interconnection. The Security amount required after the Final SIS and revised agreements is also shown below.

Cost Summary
DescriptionCost Allocated to AG1-378Cost Subject to Security*
Transmission Owner Interconnection Facilities (TOIF)$84,934$84,934
Other Scope$1,658$1,658
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0
Network Upgrades$1,099,479$1,099,479
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$3,082,635$3,082,635
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violations$0$0
AFS - Non-PJM Violations$0 **$0 **
Total$4,268,705$4,268,705

* Contributes to calculation for Security. See Security Requirement Section of this report for additional detail.

** This value reflects the results at the time of the report posting and it is subject to change. AFS – Non-PJM Violations are not subject to Security. For latest AFS – Non-PJM Violations, please refer to the latest Affected System Study Report for your project.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Security Requirement

Per Tariff Part VII, Subpart D, section 314 (Final Agreement Negotiation Phase) A.1 and PJM Manual 14H, Section 5, if a Transition Cycle 1 New Service Request is withdrawn during Decision Point III and/or the Final Agreement Negotiation Phase, PJM shall remove the New Service Request from the Cycle and adjust the Security obligations of other New Service Requests based on the withdrawal. The Final System Impact Study results will reflect the updated Security amount for this project. Security may be in the form of cash, letter of credit, or other form of Security acceptable to PJM (see PJM M14H, Section 6.4).

Security is calculated for a New Service Request based on the Network Upgrade costs allocated pursuant to the Final System Impact Study results.

Note 1: "Network Upgrades" referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Security Due for AG1-090/AG1-377/AG1-378

Security has been calculated for the AG1-090/AG1-377/AG1-378 project(s) based on the Final System Impact Study results and is shown in the table below. This Security must be provided at Final SIS through either a wire transfer or letter of credit or other form of Security deemed acceptable by PJM per Manual 14H, Section 6.4.

Security Due for AG1-090/AG1-377/AG1-378
Project(s): AG1-090/AG1-377/AG1-378
Final Agreement Security (A): $24,364,504
Portion of Costs Already Paid (B): $0
Revised Net Security (C): A B = $24,364,504
Security on Hand with PJM (D): $21,776,738
Additional Security Due at Agreement Execution (E): C D = $2,587,766
Note:

In accordance with Tariff, Part VII, Subpart D, section 314(B)(4)(a) (Final Agreement Negotiation Phase) failure to provide any required adjustments to Security within the 15 Business Day period will result in the New Service Request project being terminated and withdrawn.

Please see the cover letter for more details on Letter of Credit/Wire details to satisfy the additional Security requirement.

If no additional Security is required, please coordinate with your assigned Project Manager to initiate any refunds of Security reductions.

Transmission Owner Scope of Work

The interconnection of the project at the Primary POI will be accomplished by installing one 115 kV breaker at Philipsburg Substation to expand the station from a four breaker to a five breaker ring bus. AG1-090, AG1-377, and AG1-378 are behind the same POI. All three projects are in Transition Cycle 1 and will share costs for the required Transmission Owner Interconnection Facilities and physical interconnection network upgrades. Philipsburg Substation is planned to be converted to a four breaker ring bus with supplemental project s1919. Changes, deferral, or cancelation of this supplemental project could result in additional scope for AG1-090/AG1-377/AG1-378 to interconnect at Philipsburg Substation.

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Scope
Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
n9617.0

Install a new 115 kV breaker and associated controls direct connection of AG1-090/AG1-377/AG1-378 Generating Facility to the existing Philipsburg Substation.

$1,334,522$408,830$24,155$4,444$1,771,951$590,650 (See Note 1)
n9616.0

Install carrier equipment at Shawville Substation.

$704,108$63,203$12,744$442$780,497$260,166 (See Note 1)
n9615.0

Install carrier equipment at Eagle Valley Substation.

$679,882$53,426$12,306$374$745,988$248,663 (See Note 1)
Other
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Support for Project Developer-owned revenue metering.

$3,730$0$1,243$0$4,973$1,658 (See Note 1)
Transmission Owner Interconnection Facilities
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Philipsburg Substation Expansion – New 115kV Generator Tie Line Terminal: Construct one span of 115kV conductor from Philipsburg Substation to the Project Developer-owned dead-end structure outside the substation.

$183,511$6,813$3,322$1,499$195,145$65,048 (See Note 1)
(Pending)

Energize and integrate generator interconnection facilities to the Transmission System.

$58,509$0$1,149$0$59,658$19,886 (See Note 1)

Based on the scope of work for the Interconnection Facilities, it is expected to take 35 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase II of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.

 

Transmission Owner Analysis

TO performed an analysis of its underlying transmission system <100 kV system. New Service Request Project AG1-378 did not contribute to any overloads on the TO transmission <100 kV system.

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. FirstEnergy interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AG1-378 was evaluated as a 20.0 MW (6.0 MW Capacity) injection in the PENELEC area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1PENELEC
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
PN_P2-3_PN-230-0347-2_SRT-A
BreakerAC111.13 %980.0B1089.053.81
GD1PENELEC
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
PN_P2-3_PN-230-0347-A_SRT-A
BreakerAC108.13 %980.0B1059.683.61
GD1PENELEC
26SHAWVL 1-26SHAWVL 1 115.0/230.0 kV Ckt 1A transformer
PN_P2-2_PN-230-014T_SRT-A
BusAC104.41 %201.0B209.876.35
GD1PENELEC
26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line
PN_P2-3_PN-230-0347-2_SRT-A
BreakerAC100.58 %980.0B985.724.44

Details for 26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line l/o PN_P2-3_PN-230-0347-2_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-2_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:111.13 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:1089.05
MW Contribution:3.81
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-2_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:111.38 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:1091.53
MW Contribution:3.81
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
1.7035294117647061.448
961972AG1-040 E
Adder
1.13529411764705880.965
962511AG1-100 C
Adder
1.63058823529411771.386
962512AG1-100 E
Adder
1.08705882352941190.924
962912AG1-140 E
Adder
0.115294117647058820.098
963441AG1-193 C
Adder
0.94000000000000010.799
963442AG1-193 E
Adder
0.62705882352941180.533
963481AG1-197 C
Adder
1.28941176470588251.096
963482AG1-197 E
Adder
0.860.731
963491AG1-198 C
Adder
0.99882352941176470.849
963492AG1-198 E
Adder
0.66588235294117650.566
963992AG1-253 E
Adder
0.183529411764705890.156
964201AG1-281 C
50/50
3.2593.259
964202AG1-281 E
50/50
2.1732.173
964391AG1-301 C
Adder
2.24823529411764731.911
964392AG1-301 E
Adder
1.49882352941176471.274
290086Q-036 E
50/50
23.83223.832
296332R-032 E
50/50
19.40319.403
942351AE2-248 C
Adder
1.26470588235294111.075
942352AE2-248 E
Adder
0.84352941176470590.717
942491AE2-262 C
Adder
7.17647058823529356.1
942492AE2-262 E
Adder
4.82235294117647054.099
942501AE2-263 C
Adder
6.7458823529411775.734
942502AE2-263 E
Adder
4.5035294117647063.828
942811AE2-299 C
Adder
4.5117647058823533.835
942812AE2-299 E
Adder
18.0447058823529415.338
942961AE2-316 C
Adder
6.7588235294117655.745
942962AE2-316 E
Adder
8.0058823529411766.805
943151AE2-344 C
Adder
9.4894117647058838.066
943152AE2-344 E
Adder
6.3258823529411775.377
943352AF1-006 E
Adder
0.93058823529411770.791
943712AF1-039 E O1
Adder
1.080.918
944261AF1-094 C
Adder
1.66470588235294131.415
944262AF1-094 E
Adder
1.10941176470588230.943
944691AF1-134 C
Adder
1.9105882352941181.624
944692AF1-134 E
Adder
1.27294117647058851.082
944752AF1-140 E
50/50
1.9091.909
944781AF1-143 C
50/50
14.19514.195
944782AF1-143 E
50/50
7.5717.571
945021AF1-167 C
Adder
1.14235294117647060.971
945022AF1-167 E
Adder
0.76117647058823530.647
958742AF2-165 E
Adder
1.13882352941176480.968
959471AF2-238 C
Adder
2.15764705882352951.834
959472AF2-238 E
Adder
1.43882352941176481.223
960031AF2-294 C
Adder
1.69647058823529421.442
960032AF2-294 E
Adder
1.13058823529411770.961
960051AF2-296 C
Adder
1.9105882352941181.624
960052AF2-296 E
Adder
1.27294117647058851.082
20050326C.SLOPE
50/50
2.4572.457
20079426CONEMAGH
50/50
0.5010.501
20080926SITHE
50/50
2.7132.713
20083426SW_E13_K22
50/50
0.0230.023
20083526ARN_Z1-066
50/50
1.8931.893
20083726HOMER C1
50/50
285.882285.882
20083826HOMER C2
50/50
237.195237.195
20083926HOMER C3
50/50
251.102251.102
20084626FORWARD
50/50
0.1660.166
20085226WARR RDG
Adder
0.46823529411764710.398
200864K-013 E
50/50
8.3198.319
200883Q-053 E
50/50
8.5478.547
20088826HIGHLAND
50/50
0.4120.412
20088926STNY CRK
50/50
0.4020.402
20089026BF_G21_K23
50/50
0.1850.185
20089126CSLMN_L13
50/50
0.2280.228
20089226LOOKOUT
50/50
0.2430.243
20089426K02
Adder
7.8176470588235296.645
20092526R32
50/50
0.6470.647
20094526CT_V3-030
50/50
0.1840.184
20222526SCI_S29B
50/50
0.0830.083
20334926Z1-069 C
50/50
0.6320.632
203999P-047 E
Adder
16.46117647058823513.992
23682801GRAYMONT
Adder
0.53294117647058830.453
292350K-023
50/50
6.0666.066
292542L-013 1
50/50
7.5717.571
293301N-039 E
50/50
16.37316.373
293393V3-030E
50/50
5.3935.393
293603O-018 E
50/50
16.94316.943
293902O-048 E
50/50
6.8146.814
294515O38_P22
50/50
15.5815.58
294903P-060 E
50/50
12.74712.747
916202Z1-069 E
50/50
16.516.5
940201AE2-001 C
Adder
1.60117647058823541.361
940202AE2-001 E
Adder
1.06823529411764720.908
940861AE2-074 C
50/50
3.523.52
940862AE2-074 E
50/50
4.6344.634
941232AE2-117 E
Adder
1.52352941176470581.295
941241AE2-118 C
50/50
2.452.45
941242AE2-118 E
50/50
1.6331.633
941322AE2-126 E
Adder
1.37294117647058831.167
941332AE2-129 E
Adder
1.52470588235294141.296
941352AE2-131 E
Adder
1.52470588235294141.296
941421AE2-139 C
Adder
8.0482352941176486.841
941422AE2-139 E
Adder
5.3658823529411774.561
946222AF1-287 E
Adder
1.09058823529411760.927
946381AF1-302 C
Adder
2.9529411764705882.51
946382AF1-302 E
Adder
3.93764705882352933.347
957451AF2-039 C
Adder
1.32235294117647071.124
957452AF2-039 E
Adder
0.88117647058823530.749
957941AF2-088 C
Adder
0.63647058823529420.541
957942AF2-088 E
Adder
0.424705882352941160.361
957981AF2-092 C
50/50
2.1412.141
957982AF2-092 E
50/50
1.4271.427
958362AF2-130 E
Adder
1.1882352941176471.01
20083326SEWRDB34
50/50
34.27434.274
20088626ARWF_N39
50/50
0.4640.464
20091526CHSTN_FL
50/50
0.2830.283
20303426NA_O38_P22
50/50
0.3810.381
959301AF2-221 C
50/50
2.0172.017
959302AF2-221 E
50/50
2.7852.785
913142Y1-033 E OP1
Adder
5.99411764705882365.095
957012AF2-002 E
50/50
1.2741.274
203940AF1-140 C
50/50
2.8642.864
203946AE2-131 C
Adder
2.2870588235294121.944
203948AG1-140 C
Adder
0.254117647058823560.216
203955AF1-039 C O1
Adder
1.621.377
203962AF1-287 C
Adder
1.63647058823529411.391
203963AG1-253 C
Adder
0.381176470588235340.324
293432R-040 E
50/50
0.4260.426
294573P-028 E
Adder
13.35647058823529511.353
91600426SW_E13_K22
50/50
2.2852.285
957001AF2-001 C
50/50
3.8223.822
957002AF2-001 E
50/50
2.5482.548
957011AF2-002 C
50/50
1.9111.911
957561AF2-050 C
50/50
8.8138.813
957562AF2-050 E
50/50
5.8765.876
203961AE2-224 C
50/50
2.882.88
942126AE2-224 E
50/50
11.75111.751
20090526Q36
50/50
0.7880.788
941191AE2-113 C
50/50
13.12513.125
941192AE2-113 E
50/50
12.31912.319
944182AF1-086 E
Adder
13.94941176470588211.857
944301AF1-098 C
Adder
6.8470588235294125.82
944302AF1-098 E
Adder
4.5647058823529413.88
944881AF1-153 C
Adder
1.92117647058823531.633
944882AF1-153 E
Adder
1.28117647058823541.089
946571AF1-321 C
50/50
3.8223.822
946572AF1-321 E
50/50
2.5482.548
962411AG1-090 C
Adder
5.7188235294117654.861
962412AG1-090 E
Adder
12.39058823529411810.532
965121AG1-377 C
Adder
1.1435294117647060.972
965122AG1-377 E
Adder
2.6682352941176472.268
965131AG1-378 C
Adder
1.1435294117647060.972
965132AG1-378 E
Adder
2.6682352941176472.268
966771AG1-548 C
Adder
6.2188235294117655.286
966772AG1-548 E
Adder
14.51058823529411712.334
20391526BF_Z2-108
50/50
4.2594.259
235003AC1-025 E
Adder
0.231764705882352960.197
961581Q1080_CY23
External Queue
40.35097503662109440.350975036621094
CBM NorthLTFEXP_CBM-N->PJM
CBM
9.1639.163
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1540.154
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.5050.505
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.2570.257
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1440.144
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.4150.415
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0910.091
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.2850.285
O66PJM->LTFIMP_O-066
CMTX_NF
0.2780.278
MDUPJM->LTFIMP_MDU
CLTF
0.0120.012
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.1360.136
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.3510.351

Details for 26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line l/o PN_P2-3_PN-230-0347-A_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-A_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.13 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:1059.68
MW Contribution:3.61
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-A_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.36 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:1061.88
MW Contribution:3.61
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
1.7247058823529411.466
961972AG1-040 E
Adder
1.14941176470588240.977
962511AG1-100 C
Adder
1.65176470588235281.404
962512AG1-100 E
Adder
1.10117647058823540.936
962912AG1-140 E
Adder
0.116470588235294130.099
963441AG1-193 C
Adder
0.94941176470588240.807
963442AG1-193 E
Adder
0.63294117647058830.538
963481AG1-197 C
Adder
1.30588235294117671.11
963482AG1-197 E
Adder
0.87058823529411770.74
963491AG1-198 C
Adder
1.00823529411764710.857
963492AG1-198 E
Adder
0.67176470588235290.571
963992AG1-253 E
Adder
0.185882352941176470.158
964201AG1-281 C
50/50
2.9992.999
964202AG1-281 E
50/50
22
964391AG1-301 C
Adder
2.04352941176470631.737
964392AG1-301 E
Adder
1.36235294117647051.158
290086Q-036 E
Adder
22.2858823529411818.943
296332R-032 E
50/50
17.92417.924
942351AE2-248 C
Adder
1.21294117647058821.031
942352AE2-248 E
Adder
0.80823529411764720.687
942491AE2-262 C
Adder
6.9576470588235295.914
942492AE2-262 E
Adder
4.6752941176470593.974
942501AE2-263 C
Adder
6.5411764705882355.56
942502AE2-263 E
Adder
4.3670588235294123.712
942811AE2-299 C
Adder
4.5658823529411763.881
942812AE2-299 E
Adder
18.26117647058823615.522
942961AE2-316 C
Adder
6.7411764705882365.73
942962AE2-316 E
Adder
7.9847058823529416.787
943151AE2-344 C
Adder
9.6070588235294128.166
943152AE2-344 E
Adder
6.4047058823529425.444
943352AF1-006 E
Adder
0.94235294117647060.801
943712AF1-039 E O1
Adder
1.03294117647058830.878
944261AF1-094 C
Adder
1.681.428
944262AF1-094 E
Adder
1.11999999999999990.952
944691AF1-134 C
Adder
1.82470588235294121.551
944692AF1-134 E
Adder
1.21647058823529421.034
944752AF1-140 E
50/50
1.7691.769
944781AF1-143 C
50/50
13.57113.571
944782AF1-143 E
50/50
7.2387.238
945021AF1-167 C
Adder
1.14705882352941170.975
945022AF1-167 E
Adder
0.76470588235294120.65
958742AF2-165 E
Adder
1.1435294117647060.972
959471AF2-238 C
Adder
2.1788235294117651.852
959472AF2-238 E
Adder
1.45294117647058841.235
960031AF2-294 C
Adder
1.71647058823529421.459
960032AF2-294 E
Adder
1.14470588235294120.973
960051AF2-296 C
Adder
1.82470588235294121.551
960052AF2-296 E
Adder
1.21647058823529421.034
20050326C.SLOPE
50/50
2.2442.244
20079426CONEMAGH
50/50
0.470.47
20080926SITHE
50/50
2.7692.769
20083426SW_E13_K22
50/50
0.0220.022
20083526ARN_Z1-066
50/50
1.8091.809
20083726HOMER C1
50/50
291.812291.812
20083826HOMER C2
50/50
241.852241.852
20083926HOMER C3
50/50
256.032256.032
20084626FORWARD
50/50
0.1590.159
20085226WARR RDG
Adder
0.42588235294117650.362
200864K-013 E
50/50
7.977.97
200883Q-053 E
50/50
7.8727.872
20088826HIGHLAND
50/50
0.3810.381
20088926STNY CRK
50/50
0.3820.382
20089026BF_G21_K23
50/50
0.1770.177
20089126CSLMN_L13
50/50
0.2180.218
20089226LOOKOUT
50/50
0.2330.233
20089426K02
Adder
7.7741176470588236.608
20092526R32
50/50
0.5970.597
20222526SCI_S29B
50/50
0.0790.079
20334926Z1-069 C
50/50
0.640.64
203999P-047 E
Adder
16.65411764705882514.156
23682801GRAYMONT
Adder
0.51176470588235290.435
292350K-023
50/50
5.85.8
292542L-013 1
50/50
7.2387.238
293301N-039 E
50/50
14.49614.496
293393V3-030E
Adder
5.00470588235294044.254
293603O-018 E
50/50
15.65215.652
293902O-048 E
50/50
6.5146.514
294515O38_P22
50/50
13.79413.794
294903P-060 E
50/50
12.10412.104
916202Z1-069 E
50/50
16.69416.694
940201AE2-001 C
Adder
1.53882352941176471.308
940202AE2-001 E
Adder
1.02588235294117650.872
940861AE2-074 C
50/50
3.563.56
940862AE2-074 E
50/50
4.6864.686
941232AE2-117 E
Adder
1.3882352941176471.18
941241AE2-118 C
Adder
2.2223529411764711.889
941242AE2-118 E
Adder
1.48117647058823531.259
941322AE2-126 E
Adder
1.34470588235294121.143
941332AE2-129 E
Adder
1.4435294117647061.227
941352AE2-131 E
Adder
1.4435294117647061.227
941421AE2-139 C
Adder
8.0717647058823536.861
941422AE2-139 E
Adder
5.3811764705882354.574
946222AF1-287 E
Adder
1.10470588235294120.939
946381AF1-302 C
Adder
2.94470588235294132.503
946382AF1-302 E
Adder
3.9270588235294123.338
957451AF2-039 C
Adder
1.27764705882352961.086
957452AF2-039 E
Adder
0.8517647058823530.724
957941AF2-088 C
Adder
0.61529411764705890.523
957942AF2-088 E
Adder
0.40941176470588230.348
957981AF2-092 C
50/50
2.012.01
957982AF2-092 E
50/50
1.341.34
958362AF2-130 E
Adder
1.1882352941176471.01
20083326SEWRDB34
50/50
27.09627.096
20088626ARWF_N39
50/50
0.4110.411
20091526CHSTN_FL
50/50
0.2610.261
20303426NA_O38_P22
50/50
0.3370.337
959301AF2-221 C
50/50
1.8941.894
959302AF2-221 E
50/50
2.6162.616
913142Y1-033 E OP1
Adder
5.7305882352941184.871
957012AF2-002 E
50/50
1.2221.222
203940AF1-140 C
50/50
2.6542.654
203946AE2-131 C
Adder
2.16588235294117661.841
203948AG1-140 C
Adder
0.25647058823529410.218
203955AF1-039 C O1
Adder
1.54823529411764721.316
203962AF1-287 C
Adder
1.65647058823529411.408
203963AG1-253 C
Adder
0.38470588235294120.327
293432R-040 E
50/50
0.4070.407
294573P-028 E
Adder
13.44941176470588411.432
91600426SW_E13_K22
50/50
2.1842.184
957001AF2-001 C
50/50
3.6663.666
957002AF2-001 E
50/50
2.4442.444
957011AF2-002 C
50/50
1.8331.833
957561AF2-050 C
50/50
7.7517.751
957562AF2-050 E
50/50
5.1675.167
203961AE2-224 C
50/50
2.5332.533
942126AE2-224 E
50/50
10.33410.334
941191AE2-113 C
50/50
13.16513.165
941192AE2-113 E
50/50
12.35712.357
944182AF1-086 E
Adder
13.20588235294117611.225
944301AF1-098 C
Adder
6.9164705882352945.879
944302AF1-098 E
Adder
4.61176470588235253.92
944881AF1-153 C
Adder
1.89764705882352951.613
944882AF1-153 E
Adder
1.26470588235294111.075
946571AF1-321 C
50/50
3.6663.666
946572AF1-321 E
50/50
2.4442.444
962411AG1-090 C
Adder
5.4152941176470594.603
962412AG1-090 E
Adder
11.732941176470599.973
965121AG1-377 C
Adder
1.08352941176470590.921
965122AG1-377 E
Adder
2.5270588235294122.148
965131AG1-378 C
Adder
1.08352941176470590.921
965132AG1-378 E
Adder
2.5270588235294122.148
966771AG1-548 C
Adder
6.277647058823535.336
966772AG1-548 E
Adder
14.64705882352941112.45
20391526BF_Z2-108
50/50
4.0714.071
235003AC1-025 E
Adder
0.22117647058823530.188
961581Q1080_CY23
External Queue
41.4661674499511741.46616744995117
CBM NorthLTFEXP_CBM-N->PJM
CBM
9.2659.265
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.8750.875
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1790.179
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.4090.409
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.2360.236
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.130.13
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.2870.287
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0630.063
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.1970.197
O66PJM->LTFIMP_O-066
CMTX_NF
0.4370.437
MDUPJM->LTFIMP_MDU
CLTF
0.0070.007
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0850.085
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.3260.326

Details for 26SHAWVL 1-26SHAWVL 1 115.0/230.0 kV Ckt 1A transformer l/o PN_P2-2_PN-230-014T_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26SHAWVL 1-26SHAWVL 1 115.0/230.0 kV Ckt 1A transformer
Contingency Name:
PN_P2-2_PN-230-014T_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:104.41 %
Rating:201.0 MVA
Rating Type:B
MVA to Mitigate:209.87
MW Contribution:6.35
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26SHAWVL 1-26SHAWVL 1 115.0/230.0 kV Ckt 1A transformer
Contingency Name:
PN_P2-2_PN-230-014T_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:105.49 %
Rating:201.0 MVA
Rating Type:B
MVA to Mitigate:212.03
MW Contribution:6.35
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
290086Q-036 E
50/50
26.01626.016
942491AE2-262 C
Adder
-5.852941176470588-4.975
942501AE2-263 C
Adder
-5.50235294117647-4.677
944691AF1-134 C
50/50
3.3443.344
944692AF1-134 E
50/50
2.2292.229
960051AF2-296 C
50/50
3.3443.344
960052AF2-296 E
50/50
2.2292.229
20071526SHAWVL 1
50/50
12.27812.278
20072226SHAWVL 2
50/50
8.6158.615
200883Q-053 E
Adder
2.57411764705882362.188
20091326SHAW-D
50/50
0.4150.415
293393V3-030E
Adder
2.1823529411764711.855
941322AE2-126 E
50/50
1.7731.773
941332AE2-129 E
50/50
2.5422.542
941352AE2-131 E
50/50
2.5422.542
957451AF2-039 C
50/50
3.4253.425
957452AF2-039 E
50/50
2.2832.283
957941AF2-088 C
50/50
1.6491.649
957942AF2-088 E
50/50
1.0991.099
203946AE2-131 C
50/50
3.8123.812
203952AE2-129 C
50/50
0.6230.623
203954AE2-126 C
50/50
0.4350.435
20090526Q36
50/50
0.860.86
944181AF1-086 C
50/50
0.530.53
944182AF1-086 E
50/50
15.19115.191
962411AG1-090 C
50/50
9.5319.531
962412AG1-090 E
50/50
20.65120.651
965121AG1-377 C
50/50
1.9061.906
965122AG1-377 E
50/50
4.4484.448
965131AG1-378 C
50/50
1.9061.906
965132AG1-378 E
50/50
4.4484.448
CBM West 1LTFEXP_CBM-W1->PJM
CBM
1.9991.999
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.6990.699
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.7610.761
G-007PJM->LTFIMP_G-007
CMTX_NF
0.4960.496
NYPJM->LTFIMP_NY
CLTF
0.4150.415
LGEELTFEXP_LGEE->PJM
CLTF
0.0680.068
WECLTFEXP_WEC->PJM
CLTF
0.0390.039
CPLELTFEXP_CPLE->PJM
CLTF
0.060.06
TVALTFEXP_TVA->PJM
CLTF
0.140.14
MECLTFEXP_MEC->PJM
CLTF
0.180.18
LAGNLTFEXP_LAGN->PJM
CLTF
0.1760.176
SIGELTFEXP_SIGE->PJM
CLTF
0.0120.012
O66PJM->LTFIMP_O-066
CMTX_NF
3.3393.339
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.0290.029

Details for 26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line l/o PN_P2-3_PN-230-0347-2_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-2_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.58 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:985.72
MW Contribution:4.44
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-2_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.15 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:991.25
MW Contribution:4.44
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
1.81411764705882361.542
961972AG1-040 E
Adder
1.20941176470588241.028
962511AG1-100 C
Adder
1.73176470588235291.472
962512AG1-100 E
Adder
1.15411764705882350.981
962912AG1-140 E
Adder
0.121176470588235290.103
963441AG1-193 C
Adder
1.05294117647058830.895
963442AG1-193 E
Adder
0.70235294117647060.597
963481AG1-197 C
Adder
1.37411764705882341.168
963482AG1-197 E
Adder
0.91647058823529410.779
963491AG1-198 C
Adder
1.09882352941176480.934
963492AG1-198 E
Adder
0.73294117647058820.623
963992AG1-253 E
Adder
0.191764705882352950.163
964201AG1-281 C
Adder
3.623.077
964202AG1-281 E
Adder
2.41294117647058842.051
964391AG1-301 C
Adder
2.4388235294117652.073
964392AG1-301 E
Adder
1.62588235294117631.382
290086Q-036 E
Adder
27.34352941176470623.242
296332R-032 E
50/50
21.5121.51
942351AE2-248 C
Adder
1.40588235294117661.195
942352AE2-248 E
Adder
0.93764705882352950.797
942491AE2-262 C
Adder
8.0164705882352956.814
942492AE2-262 E
Adder
5.38705882352941154.579
942501AE2-263 C
Adder
7.535294117647066.405
942502AE2-263 E
Adder
5.0317647058823534.277
942811AE2-299 C
Adder
4.7129411764705884.006
942812AE2-299 E
Adder
18.85294117647058716.025
942961AE2-316 C
Adder
7.4294117647058836.315
942962AE2-316 E
Adder
8.7988235294117657.479
943151AE2-344 C
Adder
10.0670588235294138.557
943152AE2-344 E
Adder
6.7105882352941175.704
943352AF1-006 E
Adder
0.98235294117647050.835
943712AF1-039 E O1
Adder
1.21.02
944261AF1-094 C
Adder
1.8317647058823531.557
944262AF1-094 E
Adder
1.22117647058823531.038
944691AF1-134 C
Adder
2.9341176470588242.494
944692AF1-134 E
Adder
1.95647058823529421.663
944752AF1-140 E
50/50
2.1352.135
944781AF1-143 C
Adder
15.70000000000000113.345
944782AF1-143 E
Adder
8.3729411764705887.117
945021AF1-167 C
Adder
1.3529411764705881.15
945022AF1-167 E
Adder
0.90235294117647060.767
958742AF2-165 E
Adder
1.35882352941176481.155
959471AF2-238 C
Adder
2.1552941176470591.832
959472AF2-238 E
Adder
1.43647058823529421.221
960031AF2-294 C
Adder
1.68117647058823551.429
960032AF2-294 E
Adder
1.12117647058823520.953
960051AF2-296 C
Adder
2.9341176470588242.494
960052AF2-296 E
Adder
1.95647058823529421.663
20050326C.SLOPE
50/50
2.7852.785
20063626IUP CO-G
50/50
0.790.79
20079426CONEMAGH
50/50
0.6270.627
20080926SITHE
50/50
2.5982.598
20083526ARN_Z1-066
Adder
2.0929411764705881.779
20083726HOMER C1
50/50
273.814273.814
20083826HOMER C2
50/50
229.662229.662
20083926HOMER C3
50/50
243.127243.127
20084626FORWARD
50/50
0.1820.182
20085226WARR RDG
Adder
0.50823529411764710.432
200864K-013 E
50/50
9.1259.125
200883Q-053 E
Adder
9.6505882352941178.203
20088826HIGHLAND
50/50
0.4570.457
20088926STNY CRK
50/50
0.4450.445
20089426K02
Adder
8.26.97
20092526R32
50/50
0.7170.717
20215826CON.GEN1
50/50
0.1330.133
203999P-047 E
Adder
16.34941176470588413.897
23682801GRAYMONT
Adder
0.59294117647058830.504
292350K-023
Adder
6.7094117647058835.703
292542L-013 1
Adder
8.3729411764705887.117
293301N-039 E
Adder
17.0152941176470614.463
293393V3-030E
Adder
7.8447058823529416.668
293603O-018 E
50/50
18.78318.783
293902O-048 E
Adder
7.5364705882352946.406
294515O38_P22
Adder
16.19176470588235313.763
294903P-060 E
50/50
14.09714.097
916202Z1-069 E
Adder
16.49764705882352814.023
940201AE2-001 C
Adder
1.78235294117647051.515
940202AE2-001 E
Adder
1.1882352941176471.01
940861AE2-074 C
Adder
3.537647058823533.007
940862AE2-074 E
Adder
4.6564705882352953.958
941232AE2-117 E
Adder
1.66000000000000011.411
941241AE2-118 C
Adder
2.65764705882352952.259
941242AE2-118 E
Adder
1.7717647058823531.506
941322AE2-126 E
Adder
1.56235294117647071.328
941332AE2-129 E
Adder
1.77764705882352941.511
941352AE2-131 E
Adder
1.77764705882352941.511
941421AE2-139 C
Adder
8.1741176470588256.948
941422AE2-139 E
Adder
5.4494117647058824.632
946222AF1-287 E
Adder
1.15764705882352950.984
946381AF1-302 C
Adder
3.2458823529411762.759
946382AF1-302 E
Adder
4.3270588235294123.678
957451AF2-039 C
Adder
1.58235294117647051.345
957452AF2-039 E
Adder
1.0552941176470590.897
957941AF2-088 C
Adder
0.76235294117647070.648
957942AF2-088 E
Adder
0.50823529411764710.432
957981AF2-092 C
50/50
2.3782.378
957982AF2-092 E
50/50
1.5851.585
958362AF2-130 E
Adder
1.49058823529411751.267
20083326SEWRDB34
50/50
34.6234.62
959301AF2-221 C
50/50
2.2222.222
959302AF2-221 E
50/50
3.0683.068
913142Y1-033 E OP1
Adder
6.6576470588235295.659
957012AF2-002 E
50/50
1.41.4
203940AF1-140 C
50/50
3.2033.203
203946AE2-131 C
Adder
2.66705882352941172.267
203948AG1-140 C
Adder
0.26470588235294120.225
203955AF1-039 C O1
Adder
1.79882352941176471.529
203962AF1-287 C
Adder
1.73647058823529421.476
203963AG1-253 C
Adder
0.397647058823529460.338
293432R-040 E
Adder
0.47058823529411770.4
91600426SW_E13_K22
Adder
2.5211764705882352.143
957001AF2-001 C
50/50
4.24.2
957002AF2-001 E
50/50
2.82.8
957011AF2-002 C
50/50
2.12.1
957561AF2-050 C
Adder
9.0670588235294117.707
957562AF2-050 E
Adder
6.0447058823529415.138
942126AE2-224 E
Adder
12.08941176470588310.276
941191AE2-113 C
Adder
13.65058823529411711.603
941192AE2-113 E
Adder
12.81176470588235410.89
944182AF1-086 E
Adder
25.15176470588235321.379
944301AF1-098 C
Adder
7.2058823529411776.125
944302AF1-098 E
Adder
4.8047058823529414.084
944881AF1-153 C
Adder
2.1435294117647061.822
944882AF1-153 E
Adder
1.42941176470588241.215
946071AF1-272 C
50/50
25.825.8
946072AF1-272 E
50/50
17.217.2
946571AF1-321 C
50/50
4.24.2
946572AF1-321 E
50/50
2.82.8
962411AG1-090 C
Adder
6.6670588235294125.667
962412AG1-090 E
Adder
14.44470588235294212.278
965121AG1-377 C
Adder
1.33294117647058831.133
965122AG1-377 E
Adder
3.1105882352941182.644
965131AG1-378 C
Adder
1.33294117647058831.133
965132AG1-378 E
Adder
3.1105882352941182.644
966771AG1-548 C
Adder
6.8117647058823535.79
966772AG1-548 E
Adder
15.89411764705882413.51
20391526BF_Z2-108
Adder
5.5411764705882354.71
235003AC1-025 E
Adder
0.25764705882352940.219
CBM NorthLTFEXP_CBM-N->PJM
CBM
8.788.78
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.7562.756
G-007PJM->LTFIMP_G-007
CMTX_NF
0.5210.521
WECLTFEXP_WEC->PJM
CLTF
0.0240.024
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.2320.232
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.210.21
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1120.112
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0370.037
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0070.007
MECLTFEXP_MEC->PJM
CLTF
0.040.04
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0230.023
O66PJM->LTFIMP_O-066
CMTX_NF
2.6332.633
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.2950.295
CONTINGENCY 'PN_P2-3_PN-230-0347-2_SRT-A'
 OPEN BRANCH FROM BUS 200793 TO BUS 200741 CKT 9   /*26SEWARD 2   230.0 - 26SEWARD     115.0
 OPEN BRANCH FROM BUS 200793 TO BUS 200912 CKT 1   /*26SEWARD 2   230.0 - 26CONEMAGH   230.0
END
CONTINGENCY 'PN_P2-3_PN-230-0347-A_SRT-A'
 OPEN BRANCH FROM BUS 200793 TO BUS 200767 CKT 1   /*26SEWARD 2   230.0 - 26HOMER CT   230.0
 OPEN BRANCH FROM BUS 200793 TO BUS 200912 CKT 1   /*26SEWARD 2   230.0 - 26CONEMAGH   230.0
END
CONTINGENCY 'PN_P2-2_PN-230-014T_SRT-A'
 DISCONNECT BRANCH FROM BUS 200726 TO BUS 200666 CKT 1    /*26SHAWVL 2   230.0 - 26SHAWVL 4    22.0
 DISCONNECT BRANCH FROM BUS 200726 TO BUS 200710 CKT ZB   /*26SHAWVL 2   230.0 - 26SHAWVL 1   230.0
 DISCONNECT BRANCH FROM BUS 200726 TO BUS 235175 CKT 1    /*26SHAWVL 2   230.0 - 01ELKO       230.0
 DISCONNECT BRANCH FROM BUS 200726 TO BUS 235248 CKT 1    /*26SHAWVL 2   230.0 - 01SHINGL     230.0
END
200767 to 200795 ckt 1
999312 to 200710 ckt 1A
200795 to 200810 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1AP/PENELEC
26BLAIRSVL-01SOCIAL 138.0 kV Ckt 1 line
PN_P1-2_PN-230-038_SRT-A
OPAC110.37 %294.0B324.481.34
GD1PENELEC
26CANYON-26N.MESHPN 230.0 kV Ckt 1 line
Base Case
OPAC100.84 %546.0A550.591.54
GD1PENELEC
26E.TWANDA-26CANYON 230.0 kV Ckt 1 line
Base Case
OPAC102.24 %546.0A558.221.54
GD1PENELEC
26EAGL VAL-26TYRONE N 115.0 kV Ckt 1 line
PN_P1-2_PN-115-050_SRT-A
OPAC116.27 %245.0B284.8720.0
GD1PENELEC
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Base Case
OPAC104.61 %809.0A846.292.76
GD1PENELEC
26PHILIPSB-26SHAW. 2 115.0 kV Ckt 1 line
PN_P1-2_PN-115-052A_SRT-A
OPAC139.29 %202.0B281.3720.0

Details for 26BLAIRSVL-01SOCIAL 138.0 kV Ckt 1 line l/o PN_P1-2_PN-230-038_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AP/PENELEC
Facility Description:
26BLAIRSVL-01SOCIAL 138.0 kV Ckt 1 line
Contingency Name:
PN_P1-2_PN-230-038_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:110.37 %
Rating:294.0 MVA
Rating Type:B
MVA to Mitigate:324.48
MW Contribution:1.34
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AP/PENELEC
Facility Description:
26BLAIRSVL-01SOCIAL 138.0 kV Ckt 1 line
Contingency Name:
PN_P1-2_PN-230-038_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:108.44 %
Rating:294.0 MVA
Rating Type:B
MVA to Mitigate:318.81
MW Contribution:1.34
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
964201AG1-281 C
Adder
1.1435294117647060.972
964202AG1-281 E
Adder
0.76235294117647070.648
964391AG1-301 C
Adder
0.740.629
964392AG1-301 E
Adder
0.494117647058823550.42
290086Q-036 E
Adder
8.4341176470588237.169
296332R-032 E
50/50
6.8656.865
943712AF1-039 E O1
Adder
0.35882352941176470.305
944691AF1-134 C
Adder
1.0352941176470590.88
944692AF1-134 E
Adder
0.69058823529411760.587
944752AF1-140 E
50/50
0.6860.686
944781AF1-143 C
Adder
4.8705882352941174.14
944782AF1-143 E
Adder
2.597647058823532.208
960051AF2-296 C
Adder
1.0352941176470590.88
960052AF2-296 E
Adder
0.69058823529411760.587
20050326C.SLOPE
50/50
0.920.92
20063626IUP CO-G
50/50
0.3750.375
20079426CONEMAGH
50/50
0.2610.261
20080526COLVER13
50/50
2.3172.317
20083526ARN_Z1-066
Adder
0.64941176470588250.552
20083726HOMER C1
Adder
58.76235294117647449.948
20083826HOMER C2
Adder
47.97058823529411640.775
20083926HOMER C3
Adder
50.7823529411764743.165
20084626FORWARD
50/50
0.0570.057
20085226WARR RDG
Adder
0.154117647058823530.131
200864K-013 E
50/50
2.8792.879
200883Q-053 E
Adder
3.1035294117647062.638
20088826HIGHLAND
50/50
0.1460.146
20088926STNY CRK
50/50
0.1410.141
20092526R32
50/50
0.2290.229
20094526CT_V3-030
50/50
0.0990.099
20215826CON.GEN1
50/50
0.0660.066
20216026CON.GEN2
50/50
0.1240.124
292350K-023
Adder
2.0811764705882351.769
292542L-013 1
Adder
2.597647058823532.208
293301N-039 E
Adder
4.6435294117647063.947
293393V3-030E
50/50
2.8862.886
293603O-018 E
50/50
5.9945.994
293902O-048 E
Adder
2.33764705882352961.987
294515O38_P22
Adder
4.4188235294117653.756
294903P-060 E
50/50
4.4714.471
916202Z1-069 E
Adder
3.70705882352941173.151
940861AE2-074 C
Adder
0.78470588235294130.667
940862AE2-074 E
Adder
1.03294117647058830.878
941232AE2-117 E
Adder
0.50588235294117640.43
941241AE2-118 C
Adder
0.80352941176470590.683
941242AE2-118 E
Adder
0.53647058823529410.456
941322AE2-126 E
Adder
0.41647058823529410.354
941332AE2-129 E
Adder
0.53647058823529410.456
941352AE2-131 E
Adder
0.53647058823529410.456
957451AF2-039 C
Adder
0.46117647058823530.392
957452AF2-039 E
Adder
0.308235294117647050.262
957941AF2-088 C
Adder
0.22235294117647060.189
957942AF2-088 E
Adder
0.148235294117647080.126
957981AF2-092 C
50/50
0.7590.759
957982AF2-092 E
50/50
0.5060.506
959301AF2-221 C
50/50
0.7060.706
959302AF2-221 E
50/50
0.9750.975
913142Y1-033 E OP1
Adder
1.98941176470588241.691
957012AF2-002 E
50/50
0.4450.445
203940AF1-140 C
50/50
1.0291.029
203946AE2-131 C
Adder
0.80470588235294130.684
203955AF1-039 C O1
Adder
0.53764705882352950.457
293432R-040 E
Adder
0.145882352941176460.124
91600426SW_E13_K22
Adder
0.79647058823529420.677
957001AF2-001 C
50/50
1.3351.335
957002AF2-001 E
50/50
0.890.89
957011AF2-002 C
50/50
0.6670.667
957561AF2-050 C
Adder
2.38588235294117632.028
957562AF2-050 E
Adder
1.59058823529411791.352
942126AE2-224 E
Adder
3.18117647058823572.704
941191AE2-113 C
Adder
3.12235294117647082.654
941192AE2-113 E
Adder
2.93058823529411772.491
944181AF1-086 C
50/50
0.3370.337
944182AF1-086 E
50/50
9.6789.678
946071AF1-272 C
50/50
12.65612.656
946072AF1-272 E
50/50
8.4388.438
946571AF1-321 C
50/50
1.3351.335
946572AF1-321 E
50/50
0.890.89
962411AG1-090 C
Adder
2.0117647058823531.71
962412AG1-090 E
Adder
4.3588235294117653.705
965121AG1-377 C
Adder
0.402352941176470640.342
965122AG1-377 E
Adder
0.93882352941176480.798
965131AG1-378 C
Adder
0.402352941176470640.342
965132AG1-378 E
Adder
0.93882352941176480.798
20391526BF_Z2-108
Adder
1.71882352941176491.461
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.6390.639
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.3530.353
CBM NorthLTFEXP_CBM-N->PJM
CBM
3.0293.029
G-007ALTFEXP_G-007A->PJM
CMTX
2.532.53
VTFLTFEXP_VFT->PJM
CMTX
6.9286.928
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
1.2581.258
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.2820.282
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1810.181
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
1.631.63
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.3620.362
BlueGrassPJM->LTFIMP_BlueG
CLTF
1.1251.125
MDUPJM->LTFIMP_MDU
CLTF
0.0650.065

Details for 26CANYON-26N.MESHPN 230.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26CANYON-26N.MESHPN 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.84 %
Rating:546.0 MVA
Rating Type:A
MVA to Mitigate:550.59
MW Contribution:1.54
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26CANYON-26N.MESHPN 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:103.29 %
Rating:546.0 MVA
Rating Type:A
MVA to Mitigate:563.95
MW Contribution:1.54
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
290086Q-036 E
Adder
7.2929411764705886.199
942351AE2-248 C
Adder
0.76352941176470590.649
942352AE2-248 E
Adder
0.50941176470588230.433
942491AE2-262 C
50/50
5.0755.075
942492AE2-262 E
50/50
3.4113.411
942501AE2-263 C
50/50
4.7714.771
942502AE2-263 E
50/50
3.1853.185
942961AE2-316 C
Adder
3.02941176470588272.575
942962AE2-316 E
Adder
3.58823529411764673.05
944691AF1-134 C
Adder
0.86235294117647050.733
944692AF1-134 E
Adder
0.57411764705882350.488
959471AF2-238 C
50/50
3.3043.304
959472AF2-238 E
50/50
2.2032.203
960051AF2-296 C
Adder
0.86235294117647050.733
960052AF2-296 E
Adder
0.57411764705882350.488
20066526SHAWVL 3
50/50
2.8972.897
20066626SHAWVL 4
50/50
2.8762.876
20088726ARMNA MT
50/50
0.6220.622
20089426K02
50/50
18.03218.032
20326126BLOSSBCT
50/50
0.90.9
20328326MANOR_T86
50/50
0.0680.068
20334926Z1-069 C
50/50
0.4480.448
20335026MILZ1-092
50/50
0.8630.863
20335126GROZ1-110
50/50
1.1471.147
20335226CANZ2-011
50/50
1.1251.125
203999P-047 E
50/50
21.35621.356
23682801GRAYMONT
Adder
0.33058823529411770.281
916202Z1-069 E
50/50
11.69211.692
940201AE2-001 C
Adder
0.99411764705882360.845
940202AE2-001 E
Adder
0.66235294117647060.563
940861AE2-074 C
50/50
1.9711.971
940862AE2-074 E
50/50
2.5952.595
941322AE2-126 E
Adder
0.74823529411764710.636
941332AE2-129 E
Adder
0.61764705882352940.525
941352AE2-131 E
Adder
0.61764705882352940.525
941421AE2-139 C
50/50
24.88424.884
941422AE2-139 E
50/50
16.58916.589
946381AF1-302 C
Adder
1.32352941176470581.125
946382AF1-302 E
Adder
1.76470588235294111.5
957451AF2-039 C
Adder
0.74352941176470590.632
957452AF2-039 E
Adder
0.49647058823529410.422
957941AF2-088 C
Adder
0.35882352941176470.305
957942AF2-088 E
Adder
0.238823529411764740.203
918602AA1-077 E
Adder
-6.191764705882353-5.263
203922AA1-082 G1
50/50
27.48127.481
203923AA1-082 G2
50/50
27.48127.481
203946AE2-131 C
Adder
0.92705882352941180.788
203926AA2-133 GEN
50/50
0.4410.441
941191AE2-113 C
Adder
6.0541176470588235.146
941192AE2-113 E
Adder
5.6823529411764714.83
944881AF1-153 C
Adder
1.09058823529411760.927
944882AF1-153 E
Adder
0.72705882352941180.618
962411AG1-090 C
Adder
2.3164705882352941.969
962412AG1-090 E
Adder
5.01882352941176454.266
965121AG1-377 C
Adder
0.46352941176470590.394
965122AG1-377 E
Adder
1.08117647058823540.919
965131AG1-378 C
Adder
0.46352941176470590.394
965132AG1-378 E
Adder
1.08117647058823540.919
235003AC1-025 E
Adder
0.13882352941176470.118
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.2650.265
CBM NorthLTFEXP_CBM-N->PJM
CBM
3.4453.445
CBM West 1LTFEXP_CBM-W1->PJM
CBM
17.58517.585
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.9455.945
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
6.6856.685
G-007PJM->LTFIMP_G-007
CMTX_NF
3.5283.528
LGEELTFEXP_LGEE->PJM
CLTF
0.5730.573
WECLTFEXP_WEC->PJM
CLTF
0.330.33
CPLELTFEXP_CPLE->PJM
CLTF
0.5460.546
TVALTFEXP_TVA->PJM
CLTF
1.1881.188
MECLTFEXP_MEC->PJM
CLTF
1.5411.541
LAGNLTFEXP_LAGN->PJM
CLTF
1.51.5
SIGELTFEXP_SIGE->PJM
CLTF
0.1010.101
O66PJM->LTFIMP_O-066
CMTX_NF
24.35124.351

Details for 26E.TWANDA-26CANYON 230.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26E.TWANDA-26CANYON 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:102.24 %
Rating:546.0 MVA
Rating Type:A
MVA to Mitigate:558.22
MW Contribution:1.54
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26E.TWANDA-26CANYON 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:104.68 %
Rating:546.0 MVA
Rating Type:A
MVA to Mitigate:571.58
MW Contribution:1.54
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
290086Q-036 E
Adder
7.2929411764705886.199
942351AE2-248 C
Adder
0.76352941176470590.649
942352AE2-248 E
Adder
0.50941176470588230.433
942491AE2-262 C
50/50
5.0755.075
942492AE2-262 E
50/50
3.4113.411
942501AE2-263 C
50/50
4.7714.771
942502AE2-263 E
50/50
3.1853.185
942961AE2-316 C
Adder
3.02941176470588272.575
942962AE2-316 E
Adder
3.58823529411764673.05
944691AF1-134 C
Adder
0.86235294117647050.733
944692AF1-134 E
Adder
0.57411764705882350.488
959471AF2-238 C
50/50
3.3043.304
959472AF2-238 E
50/50
2.2032.203
960051AF2-296 C
Adder
0.86235294117647050.733
960052AF2-296 E
Adder
0.57411764705882350.488
20066526SHAWVL 3
50/50
2.8972.897
20066626SHAWVL 4
50/50
2.8762.876
20088726ARMNA MT
50/50
0.6220.622
20089426K02
50/50
18.03218.032
20326126BLOSSBCT
50/50
0.90.9
20328326MANOR_T86
50/50
0.0680.068
20334926Z1-069 C
50/50
0.4480.448
20335026MILZ1-092
50/50
0.8630.863
20335126GROZ1-110
50/50
1.1471.147
20335226CANZ2-011
50/50
1.1251.125
203999P-047 E
50/50
21.35621.356
23682801GRAYMONT
Adder
0.33058823529411770.281
916202Z1-069 E
50/50
11.69211.692
940201AE2-001 C
Adder
0.99411764705882360.845
940202AE2-001 E
Adder
0.66235294117647060.563
940861AE2-074 C
50/50
1.9711.971
940862AE2-074 E
50/50
2.5952.595
941322AE2-126 E
Adder
0.74823529411764710.636
941332AE2-129 E
Adder
0.61764705882352940.525
941352AE2-131 E
Adder
0.61764705882352940.525
941421AE2-139 C
50/50
24.88424.884
941422AE2-139 E
50/50
16.58916.589
946381AF1-302 C
Adder
1.32352941176470581.125
946382AF1-302 E
Adder
1.76470588235294111.5
957451AF2-039 C
Adder
0.74352941176470590.632
957452AF2-039 E
Adder
0.49647058823529410.422
957941AF2-088 C
Adder
0.35882352941176470.305
957942AF2-088 E
Adder
0.238823529411764740.203
918602AA1-077 E
Adder
-6.191764705882353-5.263
203922AA1-082 G1
50/50
27.48127.481
203923AA1-082 G2
50/50
27.48127.481
203946AE2-131 C
Adder
0.92705882352941180.788
203926AA2-133 GEN
50/50
0.4410.441
941191AE2-113 C
Adder
6.0541176470588235.146
941192AE2-113 E
Adder
5.6823529411764714.83
944881AF1-153 C
Adder
1.09058823529411760.927
944882AF1-153 E
Adder
0.72705882352941180.618
962411AG1-090 C
Adder
2.3164705882352941.969
962412AG1-090 E
Adder
5.01882352941176454.266
965121AG1-377 C
Adder
0.46352941176470590.394
965122AG1-377 E
Adder
1.08117647058823540.919
965131AG1-378 C
Adder
0.46352941176470590.394
965132AG1-378 E
Adder
1.08117647058823540.919
235003AC1-025 E
Adder
0.13882352941176470.118
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.2650.265
CBM NorthLTFEXP_CBM-N->PJM
CBM
3.4453.445
CBM West 1LTFEXP_CBM-W1->PJM
CBM
17.58517.585
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.9455.945
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
6.6856.685
G-007PJM->LTFIMP_G-007
CMTX_NF
3.5283.528
LGEELTFEXP_LGEE->PJM
CLTF
0.5730.573
WECLTFEXP_WEC->PJM
CLTF
0.330.33
CPLELTFEXP_CPLE->PJM
CLTF
0.5460.546
TVALTFEXP_TVA->PJM
CLTF
1.1881.188
MECLTFEXP_MEC->PJM
CLTF
1.5411.541
LAGNLTFEXP_LAGN->PJM
CLTF
1.51.5
SIGELTFEXP_SIGE->PJM
CLTF
0.1010.101
O66PJM->LTFIMP_O-066
CMTX_NF
24.35124.351

Details for 26EAGL VAL-26TYRONE N 115.0 kV Ckt 1 line l/o PN_P1-2_PN-115-050_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26EAGL VAL-26TYRONE N 115.0 kV Ckt 1 line
Contingency Name:
PN_P1-2_PN-115-050_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:116.27 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:284.87
MW Contribution:20.0
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26EAGL VAL-26TYRONE N 115.0 kV Ckt 1 line
Contingency Name:
PN_P1-2_PN-115-050_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:116.29 %
Rating:245.0 MVA
Rating Type:B
MVA to Mitigate:284.91
MW Contribution:20.0
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
290086Q-036 E
50/50
111.878111.878
941332AE2-129 E
50/50
7.9987.998
941352AE2-131 E
50/50
7.9987.998
203946AE2-131 C
50/50
11.99811.998
203952AE2-129 C
50/50
1.9611.961
20090526Q36
50/50
3.6973.697
962411AG1-090 C
50/50
29.99429.994
962412AG1-090 E
50/50
64.98764.987
965121AG1-377 C
50/50
5.9995.999
965122AG1-377 E
50/50
13.99713.997
965131AG1-378 C
50/50
5.9995.999
965132AG1-378 E
50/50
13.99713.997
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.020.02
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.0150.015
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0210.021
NYPJM->LTFIMP_NY
CLTF
0.0110.011
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0420.042
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0120.012
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0070.007
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0520.052
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0110.011
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0350.035
O66PJM->LTFIMP_O-066
CMTX_NF
0.1340.134
MDUPJM->LTFIMP_MDU
CLTF
0.0020.002

Details for 26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:104.61 %
Rating:809.0 MVA
Rating Type:A
MVA to Mitigate:846.29
MW Contribution:2.76
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:104.25 %
Rating:809.0 MVA
Rating Type:A
MVA to Mitigate:843.38
MW Contribution:2.76
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
1.30588235294117671.11
961972AG1-040 E
Adder
0.87058823529411770.74
962511AG1-100 C
Adder
1.24941176470588241.062
962512AG1-100 E
Adder
0.83294117647058820.708
962912AG1-140 E
Adder
0.089411764705882360.076
963441AG1-193 C
Adder
0.71411764705882350.607
963442AG1-193 E
Adder
0.475294117647058870.404
963481AG1-197 C
Adder
0.98823529411764710.84
963482AG1-197 E
Adder
0.65882352941176480.56
963491AG1-198 C
Adder
0.75882352941176480.645
963492AG1-198 E
Adder
0.50588235294117640.43
963992AG1-253 E
Adder
0.14117647058823530.12
964201AG1-281 C
50/50
2.312.31
964202AG1-281 E
50/50
1.541.54
964391AG1-301 C
Adder
1.5964705882352941.357
964392AG1-301 E
Adder
1.06470588235294120.905
290086Q-036 E
Adder
17.06823529411764514.508
296332R-032 E
50/50
13.78213.782
942351AE2-248 C
Adder
0.94705882352941180.805
942352AE2-248 E
Adder
0.63058823529411770.536
942491AE2-262 C
Adder
5.3941176470588244.585
942492AE2-262 E
Adder
3.62470588235294143.081
942501AE2-263 C
Adder
5.0705882352941174.31
942502AE2-263 E
Adder
3.3858823529411772.878
942811AE2-299 C
Adder
3.47764705882352932.956
942812AE2-299 E
Adder
13.91176470588235311.825
942961AE2-316 C
Adder
5.1411764705882364.37
942962AE2-316 E
Adder
6.0894117647058835.176
943151AE2-344 C
Adder
7.2705882352941186.18
943152AE2-344 E
Adder
4.8470588235294124.12
943352AF1-006 E
Adder
0.71294117647058820.606
943712AF1-039 E O1
Adder
0.78588235294117660.668
944261AF1-094 C
Adder
1.26470588235294111.075
944262AF1-094 E
Adder
0.84235294117647050.716
944691AF1-134 C
Adder
1.29411764705882361.1
944692AF1-134 E
Adder
0.86235294117647050.733
944752AF1-140 E
50/50
1.3591.359
944781AF1-143 C
50/50
10.39710.397
944782AF1-143 E
50/50
5.5455.545
945021AF1-167 C
Adder
0.84823529411764710.721
945022AF1-167 E
Adder
0.56470588235294120.48
958742AF2-165 E
Adder
0.84823529411764710.721
959471AF2-238 C
Adder
1.7247058823529411.466
959472AF2-238 E
Adder
1.14941176470588240.977
960031AF2-294 C
Adder
1.36352941176470591.159
960032AF2-294 E
Adder
0.90941176470588240.773
960051AF2-296 C
Adder
1.29411764705882361.1
960052AF2-296 E
Adder
0.86235294117647050.733
20050326C.SLOPE
50/50
1.7181.718
20079426CONEMAGH
50/50
0.3540.354
20080926SITHE
50/50
2.1782.178
20083426SW_E13_K22
50/50
0.0170.017
20083526ARN_Z1-066
50/50
1.3861.386
20083726HOMER C1
50/50
229.56229.56
20083826HOMER C2
50/50
189.739189.739
20083926HOMER C3
50/50
200.864200.864
20084626FORWARD
50/50
0.1230.123
20085226WARR RDG
Adder
0.332941176470588240.283
200864K-013 E
50/50
6.1416.141
200883Q-053 E
50/50
6.0396.039
20088726ARMNA MT
50/50
0.3830.383
20088826HIGHLAND
50/50
0.2930.293
20088926STNY CRK
50/50
0.2940.294
20089026BF_G21_K23
50/50
0.1360.136
20089126CSLMN_L13
50/50
0.1670.167
20089226LOOKOUT
50/50
0.1780.178
20089426K02
Adder
6.1400000000000015.219
20092526R32
50/50
0.4590.459
20222526SCI_S29B
50/50
0.0610.061
20334926Z1-069 C
50/50
0.5020.502
203999P-047 E
50/50
13.16513.165
23682801GRAYMONT
Adder
0.40.34
292350K-023
50/50
4.4434.443
292542L-013 1
50/50
5.5455.545
293301N-039 E
50/50
11.33411.334
293393V3-030E
Adder
3.59647058823529433.057
293603O-018 E
50/50
12.03412.034
293902O-048 E
50/50
4.9914.991
294515O38_P22
50/50
10.78510.785
294903P-060 E
50/50
9.3059.305
916202Z1-069 E
50/50
13.0913.09
940201AE2-001 C
Adder
1.21.02
940202AE2-001 E
Adder
0.80.68
940861AE2-074 C
50/50
2.7832.783
940862AE2-074 E
50/50
3.6643.664
941232AE2-117 E
Adder
1.08235294117647070.92
941241AE2-118 C
Adder
1.73176470588235291.472
941242AE2-118 E
Adder
1.15411764705882350.981
941322AE2-126 E
Adder
1.02941176470588250.875
941332AE2-129 E
Adder
1.10235294117647080.937
941352AE2-131 E
Adder
1.10235294117647080.937
941421AE2-139 C
Adder
6.4423529411764715.476
941422AE2-139 E
Adder
4.2941176470588233.65
946222AF1-287 E
Adder
0.83529411764705890.71
946381AF1-302 C
Adder
2.24588235294117671.909
946382AF1-302 E
Adder
2.99411764705882362.545
957451AF2-039 C
Adder
0.97058823529411760.825
957452AF2-039 E
Adder
0.64705882352941180.55
957941AF2-088 C
Adder
0.46705882352941180.397
957942AF2-088 E
Adder
0.311764705882352940.265
957981AF2-092 C
50/50
1.5451.545
957982AF2-092 E
50/50
1.031.03
958362AF2-130 E
Adder
0.8717647058823530.741
20083326SEWRDB34
50/50
21.09621.096
20088626ARWF_N39
50/50
0.3210.321
20091526CHSTN_FL
50/50
0.20.2
20303426NA_O38_P22
50/50
0.2640.264
959301AF2-221 C
50/50
1.4581.458
959302AF2-221 E
50/50
2.0142.014
913142Y1-033 E OP1
Adder
4.3635294117647063.709
957012AF2-002 E
50/50
0.9410.941
203940AF1-140 C
50/50
2.0382.038
203946AE2-131 C
Adder
1.65411764705882351.406
203948AG1-140 C
Adder
0.195294117647058840.166
203955AF1-039 C O1
Adder
1.17882352941176481.002
203962AF1-287 C
Adder
1.25411764705882361.066
203963AG1-253 C
Adder
0.292941176470588260.249
293432R-040 E
50/50
0.3120.312
294573P-028 E
Adder
10.9470588235294129.305
91600426SW_E13_K22
50/50
1.6791.679
957001AF2-001 C
50/50
2.8242.824
957002AF2-001 E
50/50
1.8831.883
957011AF2-002 C
50/50
1.4121.412
957561AF2-050 C
50/50
6.0546.054
957562AF2-050 E
50/50
4.0364.036
203961AE2-224 C
50/50
1.9781.978
942126AE2-224 E
50/50
8.0728.072
941191AE2-113 C
50/50
10.22110.221
941192AE2-113 E
50/50
9.5939.593
944182AF1-086 E
Adder
8.8341176470588237.509
944301AF1-098 C
Adder
5.2658823529411764.476
944302AF1-098 E
Adder
3.5105882352941182.984
944881AF1-153 C
Adder
1.45294117647058841.235
944882AF1-153 E
Adder
0.96941176470588230.824
946571AF1-321 C
50/50
2.8242.824
946572AF1-321 E
50/50
1.8831.883
962411AG1-090 C
Adder
4.1352941176470593.515
962412AG1-090 E
Adder
8.9588235294117657.615
965121AG1-377 C
Adder
0.82705882352941170.703
965122AG1-377 E
Adder
1.92941176470588241.64
965131AG1-378 C
Adder
0.82705882352941170.703
965132AG1-378 E
Adder
1.92941176470588241.64
966771AG1-548 C
Adder
4.72941176470588154.02
966772AG1-548 E
Adder
11.035294117647069.38
20391526BF_Z2-108
50/50
3.1193.119
235003AC1-025 E
Adder
0.172941176470588240.147
961581Q1080_CY23
External Queue
32.49358749389648432.493587493896484
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.3910.391
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.4020.402
CBM NorthLTFEXP_CBM-N->PJM
CBM
7.8247.824
G-007ALTFEXP_G-007A->PJM
CMTX
1.1391.139
VTFLTFEXP_VFT->PJM
CMTX
3.393.39
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.9320.932
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.3050.305
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1820.182
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
1.0451.045
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.2320.232
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.7220.722
MDUPJM->LTFIMP_MDU
CLTF
0.0390.039

Details for 26PHILIPSB-26SHAW. 2 115.0 kV Ckt 1 line l/o PN_P1-2_PN-115-052A_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26PHILIPSB-26SHAW. 2 115.0 kV Ckt 1 line
Contingency Name:
PN_P1-2_PN-115-052A_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:139.29 %
Rating:202.0 MVA
Rating Type:B
MVA to Mitigate:281.37
MW Contribution:20.0
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:PENELEC
Facility Description:
26PHILIPSB-26SHAW. 2 115.0 kV Ckt 1 line
Contingency Name:
PN_P1-2_PN-115-052A_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:139.28 %
Rating:202.0 MVA
Rating Type:B
MVA to Mitigate:281.34
MW Contribution:20.0
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
290086Q-036 E
50/50
111.878111.878
941332AE2-129 E
50/50
7.9987.998
941352AE2-131 E
50/50
7.9987.998
203946AE2-131 C
50/50
11.99811.998
203952AE2-129 C
50/50
1.9611.961
20090526Q36
50/50
3.6973.697
962411AG1-090 C
50/50
29.99429.994
962412AG1-090 E
50/50
64.98764.987
965121AG1-377 C
50/50
5.9995.999
965122AG1-377 E
50/50
13.99713.997
965131AG1-378 C
50/50
5.9995.999
965132AG1-378 E
50/50
13.99713.997
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.020.02
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.0150.015
G-007PJM->LTFIMP_G-007
CMTX_NF
0.0210.021
NYPJM->LTFIMP_NY
CLTF
0.0110.011
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.0420.042
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0120.012
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0070.007
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0520.052
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0110.011
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0350.035
O66PJM->LTFIMP_O-066
CMTX_NF
0.1340.134
MDUPJM->LTFIMP_MDU
CLTF
0.0020.002
CONTINGENCY 'PN_P1-2_PN-230-038_SRT-A'
 DISCONNECT BRANCH FROM BUS 200795 TO BUS 200810 CKT 1   /*26SHELOCTA   230.0 - 26KEYSTONE   230.0
END
CONTINGENCY 'PN_P1-2_PN-115-050_SRT-A'
 DISCONNECT BRANCH FROM BUS 200727 TO BUS 200716 CKT 1   /*26SHAW. 2    115.0 - 26PHILIPSB   115.0
END
CONTINGENCY 'PN_P1-2_PN-115-052A_SRT-A'
 DISCONNECT BRANCH FROM BUS 200904 TO BUS 200527 CKT 1   /*26EAGL VAL   115.0 - 26TYRONE N   115.0
END
200763 to 235253 ckt 1
200924 to 200706 ckt 1
200675 to 200924 ckt 1
200904 to 200527 ckt 1
200767 to 200795 ckt 1
200716 to 200727 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1PENELEC
26E.TWANDA-26CANYON 230.0 kV Ckt 1 line
PL_02_P12_001029_SRT-A
OPAC100.31 %666.0B668.031.53

Details for 26E.TWANDA-26CANYON 230.0 kV Ckt 1 line l/o PL_02_P12_001029_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PENELEC
Facility Description:
26E.TWANDA-26CANYON 230.0 kV Ckt 1 line
Contingency Name:
PL_02_P12_001029_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.31 %
Rating:666.0 MVA
Rating Type:B
MVA to Mitigate:668.03
MW Contribution:1.53
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
290086Q-036 E
Adder
7.1988235294117656.119
942351AE2-248 C
Adder
0.75529411764705890.642
942352AE2-248 E
Adder
0.50352941176470590.428
942491AE2-262 C
50/50
5.0325.032
942492AE2-262 E
50/50
3.3823.382
942501AE2-263 C
50/50
4.734.73
942502AE2-263 E
50/50
3.1583.158
942961AE2-316 C
Adder
2.9964705882352942.547
942962AE2-316 E
Adder
3.54941176470588233.017
944691AF1-134 C
Adder
0.8517647058823530.724
944692AF1-134 E
Adder
0.56823529411764710.483
959471AF2-238 C
50/50
3.2933.293
959472AF2-238 E
50/50
2.1962.196
960051AF2-296 C
Adder
0.8517647058823530.724
960052AF2-296 E
Adder
0.56823529411764710.483
20066526SHAWVL 3
50/50
2.8622.862
20088726ARMNA MT
50/50
0.6170.617
20089426K02
50/50
17.98217.982
20326126BLOSSBCT
50/50
0.8940.894
20328326MANOR_T86
50/50
0.0670.067
20334926Z1-069 C
50/50
0.4440.444
20335026MILZ1-092
50/50
0.8570.857
20335126GROZ1-110
50/50
1.141.14
20335226CANZ2-011
50/50
1.1191.119
203999P-047 E
50/50
21.28221.282
23682801GRAYMONT
Adder
0.32705882352941180.278
916202Z1-069 E
50/50
11.63211.632
940201AE2-001 C
Adder
0.98352941176470590.836
940202AE2-001 E
Adder
0.65529411764705890.557
940861AE2-074 C
50/50
1.9591.959
940862AE2-074 E
50/50
2.5782.578
941322AE2-126 E
Adder
0.74117647058823530.63
941332AE2-129 E
Adder
0.61058823529411770.519
941352AE2-131 E
Adder
0.61058823529411770.519
941421AE2-139 C
50/50
24.82924.829
941422AE2-139 E
50/50
16.55316.553
946381AF1-302 C
Adder
1.30941176470588231.113
946382AF1-302 E
Adder
1.74588235294117641.484
957451AF2-039 C
Adder
0.73764705882352940.627
957452AF2-039 E
Adder
0.491764705882352940.418
957941AF2-088 C
Adder
0.35529411764705880.302
957942AF2-088 E
Adder
0.236470588235294130.201
918602AA1-077 E
Adder
-6.261176470588236-5.322
203922AA1-082 G1
50/50
27.32927.329
203923AA1-082 G2
50/50
27.32927.329
203946AE2-131 C
Adder
0.91647058823529410.779
203926AA2-133 GEN
50/50
0.4360.436
941191AE2-113 C
Adder
6.0047058823529415.104
941192AE2-113 E
Adder
5.6364705882352944.791
944881AF1-153 C
Adder
1.080.918
944882AF1-153 E
Adder
0.720.612
962411AG1-090 C
Adder
2.29058823529411761.947
962412AG1-090 E
Adder
4.9635294117647064.219
965121AG1-377 C
Adder
0.457647058823529460.389
965122AG1-377 E
Adder
1.06941176470588250.909
965131AG1-378 C
Adder
0.457647058823529460.389
965132AG1-378 E
Adder
1.06941176470588250.909
235003AC1-025 E
Adder
0.136470588235294120.116
LTFEXP_AA2-074LTFEXP_AA2-074->LTFIMP_AA2-074
CLTF
0.250.25
CBM NorthLTFEXP_CBM-N->PJM
CBM
3.3173.317
CBM West 1LTFEXP_CBM-W1->PJM
CBM
17.16717.167
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.8275.827
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
CBM South 2LTFEXP_CBM-S2->PJM
CBM
6.4746.474
G-007PJM->LTFIMP_G-007
CMTX_NF
3.6383.638
LGEELTFEXP_LGEE->PJM
CLTF
0.5610.561
WECLTFEXP_WEC->PJM
CLTF
0.3230.323
CPLELTFEXP_CPLE->PJM
CLTF
0.5150.515
TVALTFEXP_TVA->PJM
CLTF
1.1691.169
MECLTFEXP_MEC->PJM
CLTF
1.5071.507
LAGNLTFEXP_LAGN->PJM
CLTF
1.4711.471
SIGELTFEXP_SIGE->PJM
CLTF
0.0990.099
O66PJM->LTFIMP_O-066
CMTX_NF
25.05325.053
CONTINGENCY 'PL_02_P12_001029_SRT-A'
 DISCONNECT BRANCH FROM BUS 208010 TO BUS 208014 CKT 0   /*LACK_EBUS_B4 230.0 - LAEN_B4      230.0
 DISCONNECT BRANCH FROM BUS 208013 TO BUS 208014 CKT 0   /*SUMT2_B4     230.0 - LAEN_B4      230.0
 DISCONNECT BUS 208054                                   /*LAEN         230.0
END
200675 to 200924 ckt 1

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Light Load Analysis

The New Service Request AG1-378 was evaluated as a 20.0 MW injection in the PENELEC area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Light Load Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Short Circuit Analysis

Based on PJM’s Short Circuit Analysis, this project did not contribute >1% fault duty to previously identified overdutied breakers, nor did it cause any new overdutied breakers.

Stability Analysis

Analysis Complete - No Issues

Executive Summary

 

New Service Request projects in PJM Transition Cycle 1, Cluster 71 are listed in Table 1 below. The report covers the dynamic analysis of the Cluster 71 projects.

The analysis is effectively a screening study to determine whether the addition of the Cluster 71 projects meet the dynamics requirements of the NERC, First Energy (FE), and PJM reliability standards.

 

The load flow scenario for the analysis was based on the RTEP 2027 summer peak load case, modified to include applicable projects. Cluster 71 projects were dispatched online at maximum power output, with approximately unity power factor at the high side of the GSUs, 1.02 pu voltage at the generator terminals, and 1.02 pu voltage at the POI bus for AG1-090, AG1-377, and AG1-378.

 

Cluster 71 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. Steady-state condition and 101 contingencies were studied, each with a 20 second simulation time period (with 1.0 second initial run prior to any events). Studied faults included:

a) Steady-state operation (Category P0);

b) Three-phase faults with normal clearing time (Category P1);

c) Single-phase faults with stuck breaker (Category P4);

d) Single phase faults placed at 80% of the line with delayed (Zone 2) clearing at line end remote from the fault due to primary communications/relay failure (Category P5).

No multiple-circuit tower line faults were identified for this study.

High Speed Reclosing (HSR) facilities were found in the vicinity of TC1 Cluster 71 projects.

 

For all simulations, the projects under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance. For all of the fault contingencies tested on the 2027 peak load case:

a) Cluster 71 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),

b) The system with Cluster 71 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.

c) Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus).

d) No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

No mitigation is required for TC1 Cluster 71. 

 

 Table 1: TC1 Cluster 71 Projects 

Cluster

Project

Fuel Type

Transmission Owner

MFO

MWE

MWC

Point of Interconnection

71

AG1-090

Solar + Storage

FirstEnergy (FE) Transmission System, Pennsylvania Electric Company (PENELEC) zone

95 MW

95

MW

30

MW

Philipsburg 115 kV Substation

AG1-377

Solar

FirstEnergy (FE) Transmission System, Pennsylvania Electric Company (PENELEC) zone

20

MW

20 MW

6

MW

Philipsburg 115 kV Substation

AG1-378

Solar

FirstEnergy (FE) Transmission System, Pennsylvania Electric Company (PENELEC) zone

20

MW

20 MW

6

MW

Philipsburg 115 kV Substation

 

Reactive Power Analysis

The reactive power capability of AG1-378 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AC1-025Dale SummitIn Service
AE2-001Nittany-Zion 46 kVSuspended
AE2-074Potter 46 kVUnder Construction
AE2-113Farmers Valley-Ridgeway 115 kVUnder Construction
AE2-117ABW Tap-Alexandria 46 kVSuspended
AE2-118ABW Tap-Williamsburg 46 kVEngineering & Procurement
AE2-126Dubois-Curwensville 34.5 kVIn Service
AE2-129Philipsburg-Clarence 34.5 kVIn Service
AE2-131Philipsburg-Karthaus 34.5Under Construction
AE2-139East Towanda-Grover 230 kVEngineering & Procurement
AE2-224Bear Rock-Johnstown 230 kVIn Service
AE2-248Fillmore-Thompson Farm 46 kVSuspended
AE2-262Moshannon-Milesburg 230 kVEngineering & Procurement
AE2-263Moshannon-Milesburg 230 kV IIEngineering & Procurement
AE2-299Erie East 230 kVSuspended
AE2-316Brookville-Squab Hollow 138 kVUnder Construction
AE2-344Edinboro South-Venango Junction 115 kVWithdrawn
AF1-006Fairview East 34.5 kVIn Service
AF1-039Listonburg-Highpoint 24.9 kVIn Service
AF1-086Madera-Westover South 115 kVUnder Construction
AF1-094Union City-Cambridge Springs 34.5 kVEngineering & Procurement
AF1-098Four Mile Jct-Corry East 115 kVSuspended
AF1-134Philipsburg-Madera 34.5 kVUnder Construction
AF1-140Claysburg 23 kVEngineering & Procurement
AF1-143Lick Run 115 kVEngineering & Procurement
AF1-153Motion-Ridgeway 46 kVSuspended
AF1-167West Freedom-C&K Coal 25 kVSuspended
AF1-272Lucerne 115 kVEngineering & Procurement
AF1-287Edinboro South 34.5 kV IIWithdrawn
AF1-302Brookville-Squab Hollow 138 kVUnder Construction
AF1-321Hooversville 115 kV ISuspended
AF2-001Hooversville 115 kV IISuspended
AF2-002Hooversville 115 kV IIISuspended
AF2-039Shawville-Clearfield 34.5 kVUnder Construction
AF2-050Bear Rock-Johnstown 230 kVEngineering & Procurement
AF2-088Shawville-Clearfield 34.5 kV IIUnder Construction
AF2-092Snake Spring-Bedford Area 23 kVWithdrawn
AF2-130Cobalt Corners 34.5 kVIn Service
AF2-165Clark Summit-Emlenton 34.5 kVIn Service
AF2-221Scalp Level 22.9 kVSuspended
AF2-238Mansfield-South Troy 34.5 kVEngineering & Procurement
AF2-294Thompson 34.5 kVSuspended
AF2-296Madera 34.5 kVEngineering & Procurement
AG1-040Morgan Street-Mount Hope 34.5 kVEngineering & Procurement
AG1-090Philipsburg 115 kVEngineering & Procurement
AG1-100Venango-Saegertown 34.5 kVEngineering & Procurement
AG1-140Union City 34.5 kVSuspended
AG1-193Utica Junction 34.5 kVWithdrawn
AG1-197Morgan Street-Cochranton 34.5 kVSuspended
AG1-198Union City 34.5 kVIn Service
AG1-253Erie East-Union City 34.5 kVSuspended
AG1-281Claysburg-HCR Tap 46 kVEngineering & Procurement
AG1-301Miller REC-Warrior Ridge 46 kVWithdrawn
AG1-377Philipsburg 115 kVEngineering & Procurement
AG1-548Erie South-Union City 115 kVEngineering & Procurement
V3-030St. Benedict-Patton 46kVIn Service
Y1-033Penn Mar-Rock Wood 115kVIn Service
Z1-069Gold-Sabinsville 115kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In coordination with other Affected System Operators, PJM has determined that the Affected System Operator for this project that requires an Affected System Study. For the latest Affected System Study results pertaining this project, please refer to your Affected System Study report by the Affected System Operator. If the Affected System Operator identified the need for a system reinforcement on their system due to their planning criteria, Project Developer must follow the Affected System Operator Tariff for construction of the network upgrade. PJM lists any required network upgrades identified by the Affected System Operator in the PJM Project Developer’s GIA under Schedule F.

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Final System Impact Study analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AG1-378 System Reinforcements:
TORTEP IDTitleCategoryAllocated Cost ($USD)Facilities Study
PENELECn9116.0Rebuild approximately 11 miles of the Homer City-Shelocta 230 kV line with double bundled 795 kcmil 26/7 ACSS conductorCost Allocated$2,451,189
PENELECn9119.0Reconductor/Rebuild the Shelocta – Keystone 230 kV Line, approximately 2.5 miles, with 1272 kcmil 45/7 ACSR 2-conductorCost Allocated$624,739
PENELECn9225.0Replace 230 kV substation conductor and line drops at Shelocta substation for the Homer City-Shelocta 230 kV line terminalCost Allocated$6,707
PENELECs3334.1Replace the existing Shawville 1A TransformerContingent$0N/A
Grand Total:$3,082,635

PJM evaluated the impact of topology changing reinforcements to mitigate the impacts driven by New Service Requests. PJM determined which reinforcements were eliminated as a result of modeling the topology changing reinforcements. PJM then grouped the topology changing and eliminated reinforcements by region and computed a discount factor to apply to reinforcements to reduce the cost of all these reinforcements down to the cost of contstructing only the topology changing reinforcements. For additional details, please click the icon below

Regional Topology Upgrade Conversion

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n9116.0
Type
Load Flow
TO
PENELEC
RTEP ID / TO ID
n9116.0 / TC1-PN-001.d
Title
Rebuild approximately 11 miles of the Homer City-Shelocta 230 kV line with double bundled 795 kcmil 26/7 ACSS conductor
Description
Rebuild the Homer City – Shelocta 230 kV Line, approximately 11 miles, with double bunded 795 kcmil 26/7 ACSS conductor. Terminate new conductor at Homer City substation. Terminate new conductor at Shelocta substation.
Total Cost ($USD)
$39,312,233
Discounted Total Cost ($USD)
$39,312,233
Allocated Cost ($USD)
$2,451,189
Time Estimate
31 Months

Contributor

FacilityContingency
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A858.0 MVA
(All)B1037.0 MVA
(All)C1095.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-05014.7 MW24.0%$9,442,830
AG1-090 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
18.1 MW29.6%$11,641,379
AG1-377 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
3.8 MW6.2%$2,451,189
AG1-378 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
3.8 MW6.2%$2,451,189
AG1-54820.7 MW33.9%$13,325,647

System Reinforcement: n9119.0
Type
Load Flow
TO
PENELEC
RTEP ID / TO ID
n9119.0 / TC1-PN-003.b
Title
Reconductor/Rebuild the Shelocta – Keystone 230 kV Line, approximately 2.5 miles, with 1272 kcmil 45/7 ACSR 2-conductor
Description
Reconductor/Rebuild the Shelocta – Keystone 230 kV Line, approximately 2.5 miles, with 1272 kcmil 45/7 ACSR 2-conductor. Terminate new conductor at Keystone substation. Terminate new conductor at Shelocta substation.
Total Cost ($USD)
$9,533,592
Discounted Total Cost ($USD)
$9,533,592
Allocated Cost ($USD)
$624,739
Time Estimate
23 Months

Contributor

FacilityContingency
26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A820.0 MVA
(All)B1044.0 MVA
(All)C1158.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-05015.1 MW22.3%$2,124,309
AG1-090 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
21.1 MW31.1%$2,967,790
AG1-377 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
4.4 MW6.6%$624,739
AG1-378 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
4.4 MW6.6%$624,739
AG1-54822.7 MW33.5%$3,192,016

System Reinforcement: n9225.0
Type
Load Flow
TO
PENELEC
RTEP ID / TO ID
n9225.0 / TC1-PN-001.e
Title
Replace 230 kV substation conductor and line drops at Shelocta substation for the Homer City-Shelocta 230 kV line terminal
Description
Replace 230 kV substation conductor and line drops at Shelocta substation for the Homer City-Shelocta 230 kV line terminal
Total Cost ($USD)
$107,569
Discounted Total Cost ($USD)
$107,569
Allocated Cost ($USD)
$6,707
Time Estimate
13 Months

Contributor

FacilityContingency
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A913.0 MVA
(All)B1147.0 MVA
(All)C1318.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-05014.7 MW24.0%$25,838
AG1-090 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
18.1 MW29.6%$31,854
AG1-377 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
3.8 MW6.2%$6,707
AG1-378 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
3.8 MW6.2%$6,707
AG1-54820.7 MW33.9%$36,463

System Reinforcement: s3334.1
Type
Load Flow
TO
PENELEC
RTEP ID / TO ID
s3334.1 / PN-2023-030
Title
Replace the existing Shawville 1A Transformer
Description
Replace the existing Shawville 1A Transformer with a 3-winding, 230/115-17.2kV, 180/240/300 MVA transformer. Install a 17.2 kV circuit breaker. Replace disconnect switches, bus conductor, insulators, surge arresters, and the 230 kV breaker. Transformer will be limited by relay panels owned by FE and the Plant.
Cost Information
Time Estimate
Jun 30 2027

Contingent

Note: Although AG1-378 may not presently have cost responsibility for this upgrade, AG1-378 may need this upgrade in-service to be deliverable to the PJM system. If AG1-378 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
26SHAWVL 1-26SHAWVL 1 230.0/115.0 kV Ckt 1A transformer(Any)
Rating SetRating TypeRating Value
(All)A222.0 MVA
(All)B222.0 MVA

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AG1-378


AG1-378 Contributions into Topology or Eliminated Reinforcements:
TypeTORTEP ID / TO IDTitleTopo or ElimMW ImpactPercent AllocationCategoryAllocated Cost ($USD)
Contributions into Topology or Eliminated Reinforcement Total:$0
AG1-378 Contingent Region Topology Upgrades:
TORTEP IDTitleCategoryAllocated Cost ($USD)
Region Topology Upgrade Total:$0

Attachments

AG1-378 One Line Diagram

AG1-378 One Line Diagram.pdf
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.