AG1-548 Final System Impact Study (Retool 1) Report

v1.00 released 2025-12-08 18:22

Erie South-Union City 115 kV

45.0 MW Capacity / 150.0 MW Energy

Introduction

This Final System Impact Study (SIS) Report has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 314 for New Service Requests (projects) in Transition Cycle 1 (TC1). The Project Developer/Eligible Customer (developer) is French Creek Energy, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Mid-Atlantic Interstate Transmission, LLC.

Preface

The Final System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Final System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 5, Final Agreement Negotiation Phase, the purpose of the Final Agreement Negotiation Phase is to:

  1. Negotiate, execute and enter into the applicable final interconnection related service agreement found in Tariff, Part IX;
  2. Conduct any remaining analyses or updated analyses based on New Service Requests withdrawn during Decision Point III (DP3); and
  3. Adjust the security obligation based on New Service Requests withdrawn during Decision Point III and/or during the Final Agreement Negotiation Phase.
Retool 1:

In accordance with PJM Tariff Part VII.D 314 B(1)(a), Final Agreement Negotiation Phase:

  • PJM will perform a retool (Retool 1) after the conclusion of DP3 considering only the TC1 projects moving on in the Final Agreement Negotiation Phase (Removes DP3 withdrawals).
  • The Final System Impact Study reflecting results from the retooled analysis (Retool 1) will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • PJM will provide updated final electronic agreements to Project Developers and Eligible Customers in the Cycle reflecting updates from the Final System Impact Study after Retool 1 including the adjusted Security requirements.
Retool 2 (if needed):

If particular New Service Requests do not sign their final agreements after receiving the updated information after Retool 1, there may be the need to run a second retool (Retool 2) to identify if any network upgrades are no longer necessary:

  • PJM will perform Retool 2 (if necessary) considering only the removal of TC1 projects from the model which chose not to execute their agreements after Retool 1.
  • The updated Final System Impact Study reflecting results from Retool 2 will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  • If there are any adjustments to the agreements required after Retool 2, the necessary network upgrade or Security changes will be handled via the scope change process post-GIA.

General

The Project Developer has proposed a Solar/Storage generating facility located in the Mid-Atlantic Interstate Transmission, LLC zone — Erie County, Pennsylvania. The installed facilities will have a total capability of 150.0 MW with 45.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG1-548
Project Name:
Erie South-Union City 115 kV
Project Developer Name:
French Creek Energy, LLC
State:
Pennsylvania
County:
Erie
Transmission Owner:
Mid-Atlantic Interstate Transmission, LLC
MFO:
150.0
MWE:
150.0
MWC:
45.0
Battery Storage Specification:
250.0 MWh, 10.0-hr class
Grid Charging:
Yes
Fuel Type:
Solar/Storage
Basecase Study Year:
2027

Physical Interconnection Facility Study

Received

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AG1-548 will interconnect the Mid-Atlantic Interstate Transmission, LLC transmission system by constructing a new 115 kV three breaker ring bus substation and looping the Erie South – Union City 115 kV line into the new station. The new substation will be located approximately 2.8 miles from Union City Substation. The developer will be responsible for acquiring all easements, properties, and permits that may be required to construct both the new interconnection switching station and the associated interconnection facilities. The developer will also be responsible for the rough grade of the property and an access road to the proposed three-breaker ring bus site. The project will also require remote end upgrades at Erie South Substation and Union City Substation.

Attachment 1 shows a one-line diagram of the proposed interconnection facilities for the AG1-548 generation project to connect to the transmission system.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. The Facilities Studies for the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades were performed by the Transmission Owner in Phase II. Facilities Studies are available for download on PJM.com (see General Section for document links). The Interconnected Transmission Owner has performed a Facilities Study for the required System Reliability Network Upgrades in Phase III (see System Reinforcement Section for document links).

Based on the Final SIS results, the AG1-548 project has the following allocation of costs for interconnection. The Security amount required after the Final SIS and revised agreements is also shown below.

Cost Summary
DescriptionCost Allocated to AG1-548Cost Subject to Security*
Transmission Owner Interconnection Facilities (TOIF)$54,570$54,570
Other Scope$4,973$4,973
Option To Build Oversight$946,124$946,124
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$3,058,554$3,058,554
Network Upgrades$3,639,645$3,639,645
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$14,089,682$14,089,682
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$21,793,548$21,793,548

* Contributes to calculation for Security. See Security Section of this report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Security Requirement

Per Tariff Part VII, Subpart D, section 314 (Final Agreement Negotiation Phase) A.1 and PJM Manual 14H, Section 5, if a Transition Cycle 1 New Service Request is withdrawn during Decision Point III and/or the Final Agreement Negotiation Phase, PJM shall remove the New Service Request from the Cycle and adjust the Security obligations of other New Service Requests based on the withdrawal. The Final System Impact Study results will reflect the updated Security amount for this project. Security may be in the form of cash, letter of credit, or other form of Security acceptable to PJM (see PJM M14H, Section 6.4).

Security is calculated for a New Service Request based on the Network Upgrade costs allocated pursuant to the Final System Impact Study results.

Note 1: "Network Upgrades" referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Security Due for AG1-548

Security has been calculated for the AG1-548 project(s) based on the Final System Impact Study results and is shown in the table below. This Security must be provided at Final SIS through either a wire transfer or letter of credit or other form of Security deemed acceptable by PJM per Manual 14H, Section 6.4.

Security Due for AG1-548
Project(s): AG1-548
Final Agreement Security (A): $21,793,548
Portion of Costs Already Paid (B): $0
Revised Net Security (C): A B = $21,793,548
Security on Hand with PJM (D): $21,793,441
Additional Security Due at Agreement Execution (E): C D = $107
Note:

In accordance with Tariff, Part VII, Subpart D, section 314(B)(4)(a) (Final Agreement Negotiation Phase) failure to provide any required adjustments to Security within the 15 Business Day period will result in the New Service Request project being terminated and withdrawn.

Please see the cover letter for more details on Letter of Credit/Wire details to satisfy the additional Security requirement.

If no additional Security is required, please coordinate with your assigned Project Manager to initiate any refunds of Security reductions.

Transmission Owner Scope of Work

The interconnection of the project at the Primary POI will be accomplished by constructing a new 115 kV three breaker ring bus substation and looping the Erie South – Union City 115 kV line into the new station. The new substation will be located approximately 2.8 miles from Union City Substation. The developer will be responsible for acquiring all easements, properties, and permits that may be required to construct both the new interconnection switching station and the associated facilities. The developer will also be responsible for the rough grade of the property and an access road to the proposed three-breaker ring bus site. The project will also require upgrades at Erie South Substation and Union City Substation.

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

(No Transmission Owner Scope for this project.)

Developer Scope

Project Developer has elected the option Option to Build where they will assume responsibility for the design, procurement and construction of the Transmission Owner Interconnection Facilities and/or Stand-Alone Network Upgrades identified in this SIS report.

The Project Developer must fulfill additional requirements in accordance to PJM Manual 14C, section 5.1 and PJM Manual 14H, section 8.6.2.

The cost estimates for eligible facilities and Option to Build oversight are highlighted below:

Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
n9524.0

Install equipment for anti-islanding scheme at Grandview Substation.

$267,578$27,328$4,843$191$299,940$149,970 (See Note 1)
n9523.0

Install equipment for anti-islanding scheme at Erie South Substation.

$267,578$27,328$4,843$191$299,940$149,970 (See Note 1)
n9522.0

Install equipment for anti-islanding scheme at Titusville Substation.

$291,403$53,276$5,274$373$350,326$175,163 (See Note 1)
n9521.0

Install equipment for anti-islanding scheme at Union City Substation.

$412,550$53,312$7,467$373$473,702$236,851 (See Note 1)
n9494.0

Install new relaying and modify drawings for line name change at Union City Substation.

$587,515$58,316$10,634$408$656,873$656,873
n9493.0

Install new relaying and carrier equipment and modify drawings for line name change at Erie South Substation.

$751,337$146,778$13,599$1,027$912,741$912,741
n9492.0

The Erie South – Union City 115 kV, PNT-115-RC line will be cut and looped into the new interconnection substation at a point approximately 2.8 miles from Union City substation, between structures 116 and 117.

$1,046,230$286,337$18,937$6,573$1,358,077$1,358,077
Option to Build Oversight
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

FirstEnergy oversight of developer design and construction of new interconnection substation

$929,304$0$16,820$0$946,124$946,124
Other
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Support for Project Developer owned revenue metering.

$3,730$0$1,243$0$4,973$4,973
Stand-Alone Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
n9491.0

Design, installation, and testing/commissioning for Multiprotocol Label Switching (MPLS) equipment for Supervisory Control and Data Acquisition (SCADA) transport at AG1-548 Substation including: Crossbow engineering and materials, new All-Dielectric Self-Supporting (ADSS) Fiber installation, (1) in-sub fiber run from AG1-548 Substation control house to developer-built fiber run to support communications and control to generator site.

$881,648$150,039$15,958$1,050$1,048,695$1,048,695
n9490.0

Install/Test approximately 3.12 miles of new 48 count ADSS fiber from the AG1-548 substation control house to the nearest splice point on the Zayo-owned fiber backbone (near 41.914, -79.820). Utilize the Union City to Backbone ADSS fiber cable to create a full fiber path between AG1-548 and Union City.

$692,876$91,582$12,541$641$797,640$797,640
n9654.0

FirstEnergy work at new Interconnection Substation. Install (1) security system and camera system. Install (1) indoor security AC cabinet.

$937,816$255,640$16,974$1,789$1,212,219$1,212,219
Transmission Owner Interconnection Facilities
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Energize and integrate generator interconnection facilities to the transmission system.

$53,511$0$1,059$0$54,570$54,570

Based on the scope of work for the Interconnection Facilities, it is expected to take 41 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase II of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.

 

Transmission Owner Analysis

TO performed an analysis of its underlying transmission system <100 kV system. New Service Request Project AG1-548 did not contribute to any overloads on the TO transmission <100 kV system.

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. FirstEnergy interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AG1-548 was evaluated as a 150.0 MW (45.0 MW Capacity) injection in the PENELEC area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1PENELEC
26HOMER CT _-26HOMER CT 230.0 kV Ckt S line
PN_P2-3_PN-230-0183-210_SRT-A
BreakerAC105.18 %827.0B869.824.09
GD1PENELEC
26HOMER CT _-26HOMER CT 230.0 kV Ckt S line
PN_P2-2_PN-230-001T_SRT-A
BusAC105.18 %827.0B869.824.09
GD1PENELEC
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
PN_P2-3_PN-230-0347-2_SRT-A
BreakerAC112.07 %980.0B1098.2520.73
GD1PENELEC
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
PN_P2-3_PN-230-0347-A_SRT-A
BreakerAC109.08 %980.0B1068.9520.92
GD1PENELEC
26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt S transformer
PN_P2-3_PN-230-0183-210_SRT-A
BreakerAC105.11 %827.0B869.324.09
GD1PENELEC
26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt S transformer
PN_P2-2_PN-230-001T_SRT-A
BusAC105.11 %827.0B869.324.09
GD1PENELEC
26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line
PN_P2-3_PN-230-0347-2_SRT-A
BreakerAC101.62 %980.0B995.8622.71

Details for 26HOMER CT _-26HOMER CT 230.0 kV Ckt S line l/o PN_P2-3_PN-230-0183-210_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT _-26HOMER CT 230.0 kV Ckt S line
Contingency Name:
PN_P2-3_PN-230-0183-210_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.18 %
Rating:827.0 MVA
Rating Type:B
MVA to Mitigate:869.8
MW Contribution:24.09
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT _-26HOMER CT 230.0 kV Ckt S line
Contingency Name:
PN_P2-3_PN-230-0183-210_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:106.65 %
Rating:827.0 MVA
Rating Type:B
MVA to Mitigate:882.01
MW Contribution:24.09
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
2.081.768
961972AG1-040 E
Adder
1.38588235294117631.178
962511AG1-100 C
Adder
1.99411764705882361.695
962512AG1-100 E
Adder
1.32941176470588231.13
962912AG1-140 E
Adder
0.14117647058823530.12
963441AG1-193 C
Adder
1.08235294117647070.92
963442AG1-193 E
Adder
0.72235294117647060.614
963481AG1-197 C
Adder
1.57411764705882361.338
963482AG1-197 E
Adder
1.04941176470588250.892
963491AG1-198 C
Adder
1.15411764705882350.981
963492AG1-198 E
Adder
0.76941176470588240.654
963992AG1-253 E
Adder
0.22352941176470590.19
942491AE2-262 C
Adder
4.1411764705882363.52
942492AE2-262 E
Adder
2.7823529411764712.365
942501AE2-263 C
Adder
3.89294117647058833.309
942502AE2-263 E
Adder
2.5988235294117652.209
942811AE2-299 C
Adder
5.5082352941176484.682
942812AE2-299 E
Adder
22.03411764705882418.729
942961AE2-316 C
Adder
6.6564705882352955.658
942962AE2-316 E
Adder
7.8847058823529416.702
943151AE2-344 C
Adder
11.5823529411764729.845
943152AE2-344 E
Adder
7.7211764705882356.563
943352AF1-006 E
Adder
1.13764705882352950.967
944261AF1-094 C
Adder
1.9247058823529411.636
944262AF1-094 E
Adder
1.28235294117647071.09
945021AF1-167 C
Adder
1.20588235294117641.025
945022AF1-167 E
Adder
0.80352941176470590.683
958742AF2-165 E
Adder
1.18705882352941171.009
959471AF2-238 C
50/50
2.5962.596
959472AF2-238 E
50/50
1.7311.731
960031AF2-294 C
Adder
2.0882352941176471.775
960032AF2-294 E
Adder
1.39294117647058811.184
20064226SENECA#1
50/50
7.9327.932
20064326SENECA#2
50/50
7.4247.424
20082826HNSMLK 1
50/50
2.222.22
20082926HNSMLK 2
50/50
2.222.22
20083026HNSMLK 3
50/50
2.222.22
20083126HNSMLK 4
50/50
2.222.22
20083226HNSMLK 5
50/50
2.222.22
20083826HOMER C2
50/50
323.63323.63
20083926HOMER C3
50/50
342.605342.605
20088726ARMNA MT
50/50
0.5910.591
20089426K02
Adder
7.4529411764705886.335
20326126BLOSSBCT
50/50
0.8050.805
20334926Z1-069 C
50/50
0.780.78
20335026MILZ1-092
50/50
0.770.77
203999P-047 E
50/50
20.29720.297
916202Z1-069 E
50/50
20.35120.351
940861AE2-074 C
50/50
4.3044.304
940862AE2-074 E
50/50
5.6655.665
941322AE2-126 E
Adder
0.94470588235294130.803
941421AE2-139 C
Adder
8.7764705882352957.46
941422AE2-139 E
Adder
5.8517647058823544.974
946222AF1-287 E
Adder
1.33058823529411761.131
946381AF1-302 C
Adder
2.9082352941176472.472
946382AF1-302 E
Adder
3.87764705882352923.296
957161AF2-010 C
Adder
7.3682352941176476.263
957162AF2-010 E
Adder
4.9658823529411764.221
958362AF2-130 E
Adder
1.13529411764705880.965
959301AF2-221 C
Adder
-0.9811764705882353-0.834
203940AF1-140 C
Adder
-1.258823529411765-1.07
203948AG1-140 C
Adder
0.30941176470588240.263
203955AF1-039 C O1
Adder
-0.8435294117647059-0.717
203962AF1-287 C
Adder
1.99529411764705891.696
203963AG1-253 C
Adder
0.46470588235294120.395
294573P-028 E
Adder
15.4047058823529413.094
941191AE2-113 C
50/50
14.27214.272
941192AE2-113 E
50/50
13.39513.395
944301AF1-098 C
Adder
8.157647058823536.934
944302AF1-098 E
Adder
5.4388235294117654.623
944881AF1-153 C
Adder
1.59294117647058831.354
944882AF1-153 E
Adder
1.06235294117647070.903
946071AF1-272 C
Adder
-5.752941176470588-4.89
966771AG1-548 C
Adder
7.2282352941176476.144
966772AG1-548 E
Adder
16.86470588235294314.335
961581Q1080_CY23
External Queue
60.49292373657226660.492923736572266
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1430.143
CBM NorthLTFEXP_CBM-N->PJM
CBM
11.13311.133
CBM West 1LTFEXP_CBM-W1->PJM
CBM
10.98910.989
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2652.265
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6620.662
LGEELTFEXP_LGEE->PJM
CLTF
0.2480.248
WECLTFEXP_WEC->PJM
CLTF
0.1760.176
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0810.081
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0230.023
TVALTFEXP_TVA->PJM
CLTF
0.3270.327
MECLTFEXP_MEC->PJM
CLTF
0.7410.741
LAGNLTFEXP_LAGN->PJM
CLTF
0.4450.445
SIGELTFEXP_SIGE->PJM
CLTF
0.0450.045
O66PJM->LTFIMP_O-066
CMTX_NF
3.4523.452

Details for 26HOMER CT _-26HOMER CT 230.0 kV Ckt S line l/o PN_P2-2_PN-230-001T_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT _-26HOMER CT 230.0 kV Ckt S line
Contingency Name:
PN_P2-2_PN-230-001T_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:105.18 %
Rating:827.0 MVA
Rating Type:B
MVA to Mitigate:869.8
MW Contribution:24.09
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT _-26HOMER CT 230.0 kV Ckt S line
Contingency Name:
PN_P2-2_PN-230-001T_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:106.65 %
Rating:827.0 MVA
Rating Type:B
MVA to Mitigate:882.0
MW Contribution:24.09
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
2.081.768
961972AG1-040 E
Adder
1.38588235294117631.178
962511AG1-100 C
Adder
1.99411764705882361.695
962512AG1-100 E
Adder
1.32941176470588231.13
962912AG1-140 E
Adder
0.14117647058823530.12
963441AG1-193 C
Adder
1.08235294117647070.92
963442AG1-193 E
Adder
0.72235294117647060.614
963481AG1-197 C
Adder
1.57411764705882361.338
963482AG1-197 E
Adder
1.04941176470588250.892
963491AG1-198 C
Adder
1.15411764705882350.981
963492AG1-198 E
Adder
0.76941176470588240.654
963992AG1-253 E
Adder
0.22352941176470590.19
942491AE2-262 C
Adder
4.1411764705882363.52
942492AE2-262 E
Adder
2.7823529411764712.365
942501AE2-263 C
Adder
3.89294117647058833.309
942502AE2-263 E
Adder
2.5988235294117652.209
942811AE2-299 C
Adder
5.5082352941176484.682
942812AE2-299 E
Adder
22.03411764705882418.729
942961AE2-316 C
Adder
6.6564705882352955.658
942962AE2-316 E
Adder
7.8847058823529416.702
943151AE2-344 C
Adder
11.5823529411764729.845
943152AE2-344 E
Adder
7.7211764705882356.563
943352AF1-006 E
Adder
1.13764705882352950.967
944261AF1-094 C
Adder
1.9247058823529411.636
944262AF1-094 E
Adder
1.28235294117647071.09
945021AF1-167 C
Adder
1.20588235294117641.025
945022AF1-167 E
Adder
0.80352941176470590.683
958742AF2-165 E
Adder
1.18705882352941171.009
959471AF2-238 C
50/50
2.5962.596
959472AF2-238 E
50/50
1.7311.731
960031AF2-294 C
Adder
2.0882352941176471.775
960032AF2-294 E
Adder
1.39294117647058811.184
20064226SENECA#1
50/50
7.9327.932
20064326SENECA#2
50/50
7.4247.424
20082826HNSMLK 1
50/50
2.222.22
20082926HNSMLK 2
50/50
2.222.22
20083026HNSMLK 3
50/50
2.222.22
20083126HNSMLK 4
50/50
2.222.22
20083226HNSMLK 5
50/50
2.222.22
20083826HOMER C2
50/50
323.63323.63
20083926HOMER C3
50/50
342.605342.605
20088726ARMNA MT
50/50
0.5910.591
20089426K02
Adder
7.4529411764705886.335
20326126BLOSSBCT
50/50
0.8050.805
20334926Z1-069 C
50/50
0.780.78
20335026MILZ1-092
50/50
0.770.77
203999P-047 E
50/50
20.29720.297
916202Z1-069 E
50/50
20.35120.351
940861AE2-074 C
50/50
4.3044.304
940862AE2-074 E
50/50
5.6655.665
941322AE2-126 E
Adder
0.94470588235294130.803
941421AE2-139 C
Adder
8.7764705882352957.46
941422AE2-139 E
Adder
5.8517647058823544.974
946222AF1-287 E
Adder
1.33058823529411761.131
946381AF1-302 C
Adder
2.9082352941176472.472
946382AF1-302 E
Adder
3.87764705882352923.296
957161AF2-010 C
Adder
7.3682352941176476.263
957162AF2-010 E
Adder
4.9658823529411764.221
958362AF2-130 E
Adder
1.13529411764705880.965
959301AF2-221 C
Adder
-0.9811764705882353-0.834
203940AF1-140 C
Adder
-1.258823529411765-1.07
203948AG1-140 C
Adder
0.30941176470588240.263
203955AF1-039 C O1
Adder
-0.8435294117647059-0.717
203962AF1-287 C
Adder
1.99529411764705891.696
203963AG1-253 C
Adder
0.46470588235294120.395
294573P-028 E
Adder
15.4047058823529413.094
941191AE2-113 C
50/50
14.27214.272
941192AE2-113 E
50/50
13.39513.395
944301AF1-098 C
Adder
8.157647058823536.934
944302AF1-098 E
Adder
5.4388235294117654.623
944881AF1-153 C
Adder
1.59294117647058831.354
944882AF1-153 E
Adder
1.06235294117647070.903
946071AF1-272 C
Adder
-5.752941176470588-4.89
966771AG1-548 C
Adder
7.2282352941176476.144
966772AG1-548 E
Adder
16.86470588235294314.335
961581Q1080_CY23
External Queue
60.49292373657226660.492923736572266
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1430.143
CBM NorthLTFEXP_CBM-N->PJM
CBM
11.13311.133
CBM West 1LTFEXP_CBM-W1->PJM
CBM
10.98910.989
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2652.265
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6620.662
LGEELTFEXP_LGEE->PJM
CLTF
0.2480.248
WECLTFEXP_WEC->PJM
CLTF
0.1760.176
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0810.081
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0230.023
TVALTFEXP_TVA->PJM
CLTF
0.3270.327
MECLTFEXP_MEC->PJM
CLTF
0.7410.741
LAGNLTFEXP_LAGN->PJM
CLTF
0.4450.445
SIGELTFEXP_SIGE->PJM
CLTF
0.0450.045
O66PJM->LTFIMP_O-066
CMTX_NF
3.4523.452

Details for 26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line l/o PN_P2-3_PN-230-0347-2_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-2_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:112.07 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:1098.25
MW Contribution:20.73
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-2_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:112.32 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:1100.73
MW Contribution:20.73
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
1.7035294117647061.448
961972AG1-040 E
Adder
1.13529411764705880.965
962511AG1-100 C
Adder
1.63058823529411771.386
962512AG1-100 E
Adder
1.08705882352941190.924
962912AG1-140 E
Adder
0.115294117647058820.098
963441AG1-193 C
Adder
0.94000000000000010.799
963442AG1-193 E
Adder
0.62705882352941180.533
963481AG1-197 C
Adder
1.28941176470588251.096
963482AG1-197 E
Adder
0.860.731
963491AG1-198 C
Adder
0.99882352941176470.849
963492AG1-198 E
Adder
0.66588235294117650.566
963992AG1-253 E
Adder
0.183529411764705890.156
964201AG1-281 C
50/50
3.2593.259
964202AG1-281 E
50/50
2.1732.173
964391AG1-301 C
Adder
2.24823529411764731.911
964392AG1-301 E
Adder
1.49882352941176471.274
290086Q-036 E
50/50
23.83223.832
296332R-032 E
50/50
19.40319.403
942351AE2-248 C
Adder
1.26470588235294111.075
942352AE2-248 E
Adder
0.84352941176470590.717
942491AE2-262 C
Adder
7.17647058823529356.1
942492AE2-262 E
Adder
4.82235294117647054.099
942501AE2-263 C
Adder
6.7458823529411775.734
942502AE2-263 E
Adder
4.5035294117647063.828
942811AE2-299 C
Adder
4.5117647058823533.835
942812AE2-299 E
Adder
18.0447058823529415.338
942961AE2-316 C
Adder
6.7588235294117655.745
942962AE2-316 E
Adder
8.0058823529411766.805
943151AE2-344 C
Adder
9.4894117647058838.066
943152AE2-344 E
Adder
6.3258823529411775.377
943352AF1-006 E
Adder
0.93058823529411770.791
943712AF1-039 E O1
Adder
1.080.918
944261AF1-094 C
Adder
1.66470588235294131.415
944262AF1-094 E
Adder
1.10941176470588230.943
944691AF1-134 C
Adder
1.9105882352941181.624
944692AF1-134 E
Adder
1.27294117647058851.082
944752AF1-140 E
50/50
1.9091.909
944781AF1-143 C
50/50
14.19514.195
944782AF1-143 E
50/50
7.5717.571
945021AF1-167 C
Adder
1.14235294117647060.971
945022AF1-167 E
Adder
0.76117647058823530.647
958742AF2-165 E
Adder
1.13882352941176480.968
959471AF2-238 C
Adder
2.15764705882352951.834
959472AF2-238 E
Adder
1.43882352941176481.223
960031AF2-294 C
Adder
1.69647058823529421.442
960032AF2-294 E
Adder
1.13058823529411770.961
960051AF2-296 C
Adder
1.9105882352941181.624
960052AF2-296 E
Adder
1.27294117647058851.082
20050326C.SLOPE
50/50
2.4572.457
20079426CONEMAGH
50/50
0.5010.501
20080926SITHE
50/50
2.7132.713
20083426SW_E13_K22
50/50
0.0230.023
20083526ARN_Z1-066
50/50
1.8931.893
20083726HOMER C1
50/50
285.882285.882
20083826HOMER C2
50/50
237.195237.195
20083926HOMER C3
50/50
251.102251.102
20084626FORWARD
50/50
0.1660.166
20085226WARR RDG
Adder
0.46823529411764710.398
200864K-013 E
50/50
8.3198.319
200883Q-053 E
50/50
8.5478.547
20088826HIGHLAND
50/50
0.4120.412
20088926STNY CRK
50/50
0.4020.402
20089026BF_G21_K23
50/50
0.1850.185
20089126CSLMN_L13
50/50
0.2280.228
20089226LOOKOUT
50/50
0.2430.243
20089426K02
Adder
7.8176470588235296.645
20092526R32
50/50
0.6470.647
20094526CT_V3-030
50/50
0.1840.184
20222526SCI_S29B
50/50
0.0830.083
20334926Z1-069 C
50/50
0.6320.632
203999P-047 E
Adder
16.46117647058823513.992
23682801GRAYMONT
Adder
0.53294117647058830.453
292350K-023
50/50
6.0666.066
292542L-013 1
50/50
7.5717.571
293301N-039 E
50/50
16.37316.373
293393V3-030E
50/50
5.3935.393
293603O-018 E
50/50
16.94316.943
293902O-048 E
50/50
6.8146.814
294515O38_P22
50/50
15.5815.58
294903P-060 E
50/50
12.74712.747
916202Z1-069 E
50/50
16.516.5
940201AE2-001 C
Adder
1.60117647058823541.361
940202AE2-001 E
Adder
1.06823529411764720.908
940861AE2-074 C
50/50
3.523.52
940862AE2-074 E
50/50
4.6344.634
941232AE2-117 E
Adder
1.52352941176470581.295
941241AE2-118 C
50/50
2.452.45
941242AE2-118 E
50/50
1.6331.633
941322AE2-126 E
Adder
1.37294117647058831.167
941332AE2-129 E
Adder
1.52470588235294141.296
941352AE2-131 E
Adder
1.52470588235294141.296
941421AE2-139 C
Adder
8.0482352941176486.841
941422AE2-139 E
Adder
5.3658823529411774.561
946222AF1-287 E
Adder
1.09058823529411760.927
946381AF1-302 C
Adder
2.9529411764705882.51
946382AF1-302 E
Adder
3.93764705882352933.347
957161AF2-010 C
Adder
6.3964705882352955.437
957162AF2-010 E
Adder
4.3105882352941183.664
957451AF2-039 C
Adder
1.32235294117647071.124
957452AF2-039 E
Adder
0.88117647058823530.749
957941AF2-088 C
Adder
0.63647058823529420.541
957942AF2-088 E
Adder
0.424705882352941160.361
957981AF2-092 C
50/50
2.1412.141
957982AF2-092 E
50/50
1.4271.427
958362AF2-130 E
Adder
1.1882352941176471.01
20083326SEWRDB34
50/50
34.27434.274
20088626ARWF_N39
50/50
0.4640.464
20091526CHSTN_FL
50/50
0.2830.283
20303426NA_O38_P22
50/50
0.3810.381
959301AF2-221 C
50/50
2.0172.017
959302AF2-221 E
50/50
2.7852.785
913142Y1-033 E OP1
Adder
5.99411764705882365.095
957012AF2-002 E
50/50
1.2741.274
203940AF1-140 C
50/50
2.8642.864
203946AE2-131 C
Adder
2.2870588235294121.944
203948AG1-140 C
Adder
0.254117647058823560.216
203955AF1-039 C O1
Adder
1.621.377
203962AF1-287 C
Adder
1.63647058823529411.391
203963AG1-253 C
Adder
0.381176470588235340.324
293432R-040 E
50/50
0.4260.426
294573P-028 E
Adder
13.35647058823529511.353
91600426SW_E13_K22
50/50
2.2852.285
957001AF2-001 C
50/50
3.8223.822
957002AF2-001 E
50/50
2.5482.548
957011AF2-002 C
50/50
1.9111.911
957561AF2-050 C
50/50
8.8138.813
957562AF2-050 E
50/50
5.8765.876
203961AE2-224 C
50/50
2.882.88
942126AE2-224 E
50/50
11.75111.751
20090526Q36
50/50
0.7880.788
941191AE2-113 C
50/50
13.12513.125
941192AE2-113 E
50/50
12.31912.319
944182AF1-086 E
Adder
13.94941176470588211.857
944301AF1-098 C
Adder
6.8470588235294125.82
944302AF1-098 E
Adder
4.5647058823529413.88
944881AF1-153 C
Adder
1.92117647058823531.633
944882AF1-153 E
Adder
1.28117647058823541.089
946571AF1-321 C
50/50
3.8223.822
946572AF1-321 E
50/50
2.5482.548
962411AG1-090 C
Adder
5.7188235294117654.861
962412AG1-090 E
Adder
12.39058823529411810.532
965121AG1-377 C
Adder
1.1435294117647060.972
965122AG1-377 E
Adder
2.6682352941176472.268
965131AG1-378 C
Adder
1.1435294117647060.972
965132AG1-378 E
Adder
2.6682352941176472.268
966771AG1-548 C
Adder
6.2188235294117655.286
966772AG1-548 E
Adder
14.51058823529411712.334
20391526BF_Z2-108
50/50
4.2594.259
235003AC1-025 E
Adder
0.231764705882352960.197
961581Q1080_CY23
External Queue
40.35097503662109440.350975036621094
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.1360.136
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.3510.351
CBM NorthLTFEXP_CBM-N->PJM
CBM
9.1639.163
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1540.154
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.5050.505
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.2570.257
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1440.144
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.4150.415
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0910.091
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.2850.285
O66PJM->LTFIMP_O-066
CMTX_NF
0.2780.278
MDUPJM->LTFIMP_MDU
CLTF
0.0120.012

Details for 26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line l/o PN_P2-3_PN-230-0347-A_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-A_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:109.08 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:1068.95
MW Contribution:20.92
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-A_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:109.3 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:1071.14
MW Contribution:20.92
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
1.7247058823529411.466
961972AG1-040 E
Adder
1.14941176470588240.977
962511AG1-100 C
Adder
1.65176470588235281.404
962512AG1-100 E
Adder
1.10117647058823540.936
962912AG1-140 E
Adder
0.116470588235294130.099
963441AG1-193 C
Adder
0.94941176470588240.807
963442AG1-193 E
Adder
0.63294117647058830.538
963481AG1-197 C
Adder
1.30588235294117671.11
963482AG1-197 E
Adder
0.87058823529411770.74
963491AG1-198 C
Adder
1.00823529411764710.857
963492AG1-198 E
Adder
0.67176470588235290.571
963992AG1-253 E
Adder
0.185882352941176470.158
964201AG1-281 C
50/50
2.9992.999
964202AG1-281 E
50/50
22
964391AG1-301 C
Adder
2.04352941176470631.737
964392AG1-301 E
Adder
1.36235294117647051.158
290086Q-036 E
Adder
22.2858823529411818.943
296332R-032 E
50/50
17.92417.924
942351AE2-248 C
Adder
1.21294117647058821.031
942352AE2-248 E
Adder
0.80823529411764720.687
942491AE2-262 C
Adder
6.9576470588235295.914
942492AE2-262 E
Adder
4.6752941176470593.974
942501AE2-263 C
Adder
6.5411764705882355.56
942502AE2-263 E
Adder
4.3670588235294123.712
942811AE2-299 C
Adder
4.5658823529411763.881
942812AE2-299 E
Adder
18.26117647058823615.522
942961AE2-316 C
Adder
6.7411764705882365.73
942962AE2-316 E
Adder
7.9847058823529416.787
943151AE2-344 C
Adder
9.6070588235294128.166
943152AE2-344 E
Adder
6.4047058823529425.444
943352AF1-006 E
Adder
0.94235294117647060.801
943712AF1-039 E O1
Adder
1.03294117647058830.878
944261AF1-094 C
Adder
1.681.428
944262AF1-094 E
Adder
1.11999999999999990.952
944691AF1-134 C
Adder
1.82470588235294121.551
944692AF1-134 E
Adder
1.21647058823529421.034
944752AF1-140 E
50/50
1.7691.769
944781AF1-143 C
50/50
13.57113.571
944782AF1-143 E
50/50
7.2387.238
945021AF1-167 C
Adder
1.14705882352941170.975
945022AF1-167 E
Adder
0.76470588235294120.65
958742AF2-165 E
Adder
1.1435294117647060.972
959471AF2-238 C
Adder
2.1788235294117651.852
959472AF2-238 E
Adder
1.45294117647058841.235
960031AF2-294 C
Adder
1.71647058823529421.459
960032AF2-294 E
Adder
1.14470588235294120.973
960051AF2-296 C
Adder
1.82470588235294121.551
960052AF2-296 E
Adder
1.21647058823529421.034
20050326C.SLOPE
50/50
2.2442.244
20079426CONEMAGH
50/50
0.470.47
20080926SITHE
50/50
2.7692.769
20083426SW_E13_K22
50/50
0.0220.022
20083526ARN_Z1-066
50/50
1.8091.809
20083726HOMER C1
50/50
291.812291.812
20083826HOMER C2
50/50
241.852241.852
20083926HOMER C3
50/50
256.032256.032
20084626FORWARD
50/50
0.1590.159
20085226WARR RDG
Adder
0.42588235294117650.362
200864K-013 E
50/50
7.977.97
200883Q-053 E
50/50
7.8727.872
20088826HIGHLAND
50/50
0.3810.381
20088926STNY CRK
50/50
0.3820.382
20089026BF_G21_K23
50/50
0.1770.177
20089126CSLMN_L13
50/50
0.2180.218
20089226LOOKOUT
50/50
0.2330.233
20089426K02
Adder
7.7741176470588236.608
20092526R32
50/50
0.5970.597
20222526SCI_S29B
50/50
0.0790.079
20334926Z1-069 C
50/50
0.640.64
203999P-047 E
Adder
16.65411764705882514.156
23682801GRAYMONT
Adder
0.51176470588235290.435
292350K-023
50/50
5.85.8
292542L-013 1
50/50
7.2387.238
293301N-039 E
50/50
14.49614.496
293393V3-030E
Adder
5.00470588235294044.254
293603O-018 E
50/50
15.65215.652
293902O-048 E
50/50
6.5146.514
294515O38_P22
50/50
13.79413.794
294903P-060 E
50/50
12.10412.104
916202Z1-069 E
50/50
16.69416.694
940201AE2-001 C
Adder
1.53882352941176471.308
940202AE2-001 E
Adder
1.02588235294117650.872
940861AE2-074 C
50/50
3.563.56
940862AE2-074 E
50/50
4.6864.686
941232AE2-117 E
Adder
1.3882352941176471.18
941241AE2-118 C
Adder
2.2223529411764711.889
941242AE2-118 E
Adder
1.48117647058823531.259
941322AE2-126 E
Adder
1.34470588235294121.143
941332AE2-129 E
Adder
1.4435294117647061.227
941352AE2-131 E
Adder
1.4435294117647061.227
941421AE2-139 C
Adder
8.0717647058823536.861
941422AE2-139 E
Adder
5.3811764705882354.574
946222AF1-287 E
Adder
1.10470588235294120.939
946381AF1-302 C
Adder
2.94470588235294132.503
946382AF1-302 E
Adder
3.9270588235294123.338
957161AF2-010 C
Adder
6.4529411764705885.485
957162AF2-010 E
Adder
4.34941176470588253.697
957451AF2-039 C
Adder
1.27764705882352961.086
957452AF2-039 E
Adder
0.8517647058823530.724
957941AF2-088 C
Adder
0.61529411764705890.523
957942AF2-088 E
Adder
0.40941176470588230.348
957981AF2-092 C
50/50
2.012.01
957982AF2-092 E
50/50
1.341.34
958362AF2-130 E
Adder
1.1882352941176471.01
20083326SEWRDB34
50/50
27.09627.096
20088626ARWF_N39
50/50
0.4110.411
20091526CHSTN_FL
50/50
0.2610.261
20303426NA_O38_P22
50/50
0.3370.337
959301AF2-221 C
50/50
1.8941.894
959302AF2-221 E
50/50
2.6162.616
913142Y1-033 E OP1
Adder
5.7305882352941184.871
957012AF2-002 E
50/50
1.2221.222
203940AF1-140 C
50/50
2.6542.654
203946AE2-131 C
Adder
2.16588235294117661.841
203948AG1-140 C
Adder
0.25647058823529410.218
203955AF1-039 C O1
Adder
1.54823529411764721.316
203962AF1-287 C
Adder
1.65647058823529411.408
203963AG1-253 C
Adder
0.38470588235294120.327
293432R-040 E
50/50
0.4070.407
294573P-028 E
Adder
13.44941176470588411.432
91600426SW_E13_K22
50/50
2.1842.184
957001AF2-001 C
50/50
3.6663.666
957002AF2-001 E
50/50
2.4442.444
957011AF2-002 C
50/50
1.8331.833
957561AF2-050 C
50/50
7.7517.751
957562AF2-050 E
50/50
5.1675.167
203961AE2-224 C
50/50
2.5332.533
942126AE2-224 E
50/50
10.33410.334
941191AE2-113 C
50/50
13.16513.165
941192AE2-113 E
50/50
12.35712.357
944182AF1-086 E
Adder
13.20588235294117611.225
944301AF1-098 C
Adder
6.9164705882352945.879
944302AF1-098 E
Adder
4.61176470588235253.92
944881AF1-153 C
Adder
1.89764705882352951.613
944882AF1-153 E
Adder
1.26470588235294111.075
946571AF1-321 C
50/50
3.6663.666
946572AF1-321 E
50/50
2.4442.444
962411AG1-090 C
Adder
5.4152941176470594.603
962412AG1-090 E
Adder
11.732941176470599.973
965121AG1-377 C
Adder
1.08352941176470590.921
965122AG1-377 E
Adder
2.5270588235294122.148
965131AG1-378 C
Adder
1.08352941176470590.921
965132AG1-378 E
Adder
2.5270588235294122.148
966771AG1-548 C
Adder
6.277647058823535.336
966772AG1-548 E
Adder
14.64705882352941112.45
20391526BF_Z2-108
50/50
4.0714.071
235003AC1-025 E
Adder
0.22117647058823530.188
961581Q1080_CY23
External Queue
41.4661674499511741.46616744995117
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.0850.085
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.3260.326
CBM NorthLTFEXP_CBM-N->PJM
CBM
9.2659.265
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.8750.875
G-007PJM->LTFIMP_G-007
CMTX_NF
0.1790.179
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.4090.409
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.2360.236
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.130.13
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.2870.287
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0630.063
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.1970.197
O66PJM->LTFIMP_O-066
CMTX_NF
0.4370.437
MDUPJM->LTFIMP_MDU
CLTF
0.0070.007

Details for 26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt S transformer l/o PN_P2-3_PN-230-0183-210_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt S transformer
Contingency Name:
PN_P2-3_PN-230-0183-210_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.11 %
Rating:827.0 MVA
Rating Type:B
MVA to Mitigate:869.3
MW Contribution:24.09
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt S transformer
Contingency Name:
PN_P2-3_PN-230-0183-210_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:106.58 %
Rating:827.0 MVA
Rating Type:B
MVA to Mitigate:881.44
MW Contribution:24.09
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
2.081.768
961972AG1-040 E
Adder
1.38588235294117631.178
962511AG1-100 C
Adder
1.99411764705882361.695
962512AG1-100 E
Adder
1.32941176470588231.13
962912AG1-140 E
Adder
0.14117647058823530.12
963441AG1-193 C
Adder
1.08235294117647070.92
963442AG1-193 E
Adder
0.72235294117647060.614
963481AG1-197 C
Adder
1.57411764705882361.338
963482AG1-197 E
Adder
1.04941176470588250.892
963491AG1-198 C
Adder
1.15411764705882350.981
963492AG1-198 E
Adder
0.76941176470588240.654
963992AG1-253 E
Adder
0.22352941176470590.19
942491AE2-262 C
Adder
4.1411764705882363.52
942492AE2-262 E
Adder
2.7823529411764712.365
942501AE2-263 C
Adder
3.89294117647058833.309
942502AE2-263 E
Adder
2.5988235294117652.209
942811AE2-299 C
Adder
5.5082352941176484.682
942812AE2-299 E
Adder
22.03411764705882418.729
942961AE2-316 C
Adder
6.6564705882352955.658
942962AE2-316 E
Adder
7.8847058823529416.702
943151AE2-344 C
Adder
11.5823529411764729.845
943152AE2-344 E
Adder
7.7211764705882356.563
943352AF1-006 E
Adder
1.13764705882352950.967
944261AF1-094 C
Adder
1.9247058823529411.636
944262AF1-094 E
Adder
1.28235294117647071.09
945021AF1-167 C
Adder
1.20588235294117641.025
945022AF1-167 E
Adder
0.80352941176470590.683
958742AF2-165 E
Adder
1.18705882352941171.009
959471AF2-238 C
50/50
2.5962.596
959472AF2-238 E
50/50
1.7311.731
960031AF2-294 C
Adder
2.0882352941176471.775
960032AF2-294 E
Adder
1.39294117647058811.184
20064226SENECA#1
50/50
7.9327.932
20064326SENECA#2
50/50
7.4247.424
20082826HNSMLK 1
50/50
2.222.22
20082926HNSMLK 2
50/50
2.222.22
20083026HNSMLK 3
50/50
2.222.22
20083126HNSMLK 4
50/50
2.222.22
20083226HNSMLK 5
50/50
2.222.22
20083826HOMER C2
50/50
323.63323.63
20083926HOMER C3
50/50
342.605342.605
20088726ARMNA MT
50/50
0.5910.591
20089426K02
Adder
7.4529411764705886.335
20326126BLOSSBCT
50/50
0.8050.805
20334926Z1-069 C
50/50
0.780.78
20335026MILZ1-092
50/50
0.770.77
203999P-047 E
50/50
20.29720.297
916202Z1-069 E
50/50
20.35120.351
940861AE2-074 C
50/50
4.3044.304
940862AE2-074 E
50/50
5.6655.665
941322AE2-126 E
Adder
0.94470588235294130.803
941421AE2-139 C
Adder
8.7764705882352957.46
941422AE2-139 E
Adder
5.8517647058823544.974
946222AF1-287 E
Adder
1.33058823529411761.131
946381AF1-302 C
Adder
2.9082352941176472.472
946382AF1-302 E
Adder
3.87764705882352923.296
957161AF2-010 C
Adder
7.3682352941176476.263
957162AF2-010 E
Adder
4.9658823529411764.221
958362AF2-130 E
Adder
1.13529411764705880.965
959301AF2-221 C
Adder
-0.9811764705882353-0.834
203940AF1-140 C
Adder
-1.258823529411765-1.07
203948AG1-140 C
Adder
0.30941176470588240.263
203955AF1-039 C O1
Adder
-0.8435294117647059-0.717
203962AF1-287 C
Adder
1.99529411764705891.696
203963AG1-253 C
Adder
0.46470588235294120.395
294573P-028 E
Adder
15.4047058823529413.094
941191AE2-113 C
50/50
14.27214.272
941192AE2-113 E
50/50
13.39513.395
944301AF1-098 C
Adder
8.157647058823536.934
944302AF1-098 E
Adder
5.4388235294117654.623
944881AF1-153 C
Adder
1.59294117647058831.354
944882AF1-153 E
Adder
1.06235294117647070.903
946071AF1-272 C
Adder
-5.752941176470588-4.89
966771AG1-548 C
Adder
7.2282352941176476.144
966772AG1-548 E
Adder
16.86470588235294314.335
961581Q1080_CY23
External Queue
60.49292373657226660.492923736572266
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1430.143
CBM NorthLTFEXP_CBM-N->PJM
CBM
11.13311.133
CBM West 1LTFEXP_CBM-W1->PJM
CBM
10.98910.989
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2652.265
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6620.662
LGEELTFEXP_LGEE->PJM
CLTF
0.2480.248
WECLTFEXP_WEC->PJM
CLTF
0.1760.176
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0810.081
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0230.023
TVALTFEXP_TVA->PJM
CLTF
0.3270.327
MECLTFEXP_MEC->PJM
CLTF
0.7410.741
LAGNLTFEXP_LAGN->PJM
CLTF
0.4450.445
SIGELTFEXP_SIGE->PJM
CLTF
0.0450.045
O66PJM->LTFIMP_O-066
CMTX_NF
3.4523.452

Details for 26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt S transformer l/o PN_P2-2_PN-230-001T_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt S transformer
Contingency Name:
PN_P2-2_PN-230-001T_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:105.11 %
Rating:827.0 MVA
Rating Type:B
MVA to Mitigate:869.3
MW Contribution:24.09
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt S transformer
Contingency Name:
PN_P2-2_PN-230-001T_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:106.58 %
Rating:827.0 MVA
Rating Type:B
MVA to Mitigate:881.43
MW Contribution:24.09
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
2.081.768
961972AG1-040 E
Adder
1.38588235294117631.178
962511AG1-100 C
Adder
1.99411764705882361.695
962512AG1-100 E
Adder
1.32941176470588231.13
962912AG1-140 E
Adder
0.14117647058823530.12
963441AG1-193 C
Adder
1.08235294117647070.92
963442AG1-193 E
Adder
0.72235294117647060.614
963481AG1-197 C
Adder
1.57411764705882361.338
963482AG1-197 E
Adder
1.04941176470588250.892
963491AG1-198 C
Adder
1.15411764705882350.981
963492AG1-198 E
Adder
0.76941176470588240.654
963992AG1-253 E
Adder
0.22352941176470590.19
942491AE2-262 C
Adder
4.1411764705882363.52
942492AE2-262 E
Adder
2.7823529411764712.365
942501AE2-263 C
Adder
3.89294117647058833.309
942502AE2-263 E
Adder
2.5988235294117652.209
942811AE2-299 C
Adder
5.5082352941176484.682
942812AE2-299 E
Adder
22.03411764705882418.729
942961AE2-316 C
Adder
6.6564705882352955.658
942962AE2-316 E
Adder
7.8847058823529416.702
943151AE2-344 C
Adder
11.5823529411764729.845
943152AE2-344 E
Adder
7.7211764705882356.563
943352AF1-006 E
Adder
1.13764705882352950.967
944261AF1-094 C
Adder
1.9247058823529411.636
944262AF1-094 E
Adder
1.28235294117647071.09
945021AF1-167 C
Adder
1.20588235294117641.025
945022AF1-167 E
Adder
0.80352941176470590.683
958742AF2-165 E
Adder
1.18705882352941171.009
959471AF2-238 C
50/50
2.5962.596
959472AF2-238 E
50/50
1.7311.731
960031AF2-294 C
Adder
2.0882352941176471.775
960032AF2-294 E
Adder
1.39294117647058811.184
20064226SENECA#1
50/50
7.9327.932
20064326SENECA#2
50/50
7.4247.424
20082826HNSMLK 1
50/50
2.222.22
20082926HNSMLK 2
50/50
2.222.22
20083026HNSMLK 3
50/50
2.222.22
20083126HNSMLK 4
50/50
2.222.22
20083226HNSMLK 5
50/50
2.222.22
20083826HOMER C2
50/50
323.63323.63
20083926HOMER C3
50/50
342.605342.605
20088726ARMNA MT
50/50
0.5910.591
20089426K02
Adder
7.4529411764705886.335
20326126BLOSSBCT
50/50
0.8050.805
20334926Z1-069 C
50/50
0.780.78
20335026MILZ1-092
50/50
0.770.77
203999P-047 E
50/50
20.29720.297
916202Z1-069 E
50/50
20.35120.351
940861AE2-074 C
50/50
4.3044.304
940862AE2-074 E
50/50
5.6655.665
941322AE2-126 E
Adder
0.94470588235294130.803
941421AE2-139 C
Adder
8.7764705882352957.46
941422AE2-139 E
Adder
5.8517647058823544.974
946222AF1-287 E
Adder
1.33058823529411761.131
946381AF1-302 C
Adder
2.9082352941176472.472
946382AF1-302 E
Adder
3.87764705882352923.296
957161AF2-010 C
Adder
7.3682352941176476.263
957162AF2-010 E
Adder
4.9658823529411764.221
958362AF2-130 E
Adder
1.13529411764705880.965
959301AF2-221 C
Adder
-0.9811764705882353-0.834
203940AF1-140 C
Adder
-1.258823529411765-1.07
203948AG1-140 C
Adder
0.30941176470588240.263
203955AF1-039 C O1
Adder
-0.8435294117647059-0.717
203962AF1-287 C
Adder
1.99529411764705891.696
203963AG1-253 C
Adder
0.46470588235294120.395
294573P-028 E
Adder
15.4047058823529413.094
941191AE2-113 C
50/50
14.27214.272
941192AE2-113 E
50/50
13.39513.395
944301AF1-098 C
Adder
8.157647058823536.934
944302AF1-098 E
Adder
5.4388235294117654.623
944881AF1-153 C
Adder
1.59294117647058831.354
944882AF1-153 E
Adder
1.06235294117647070.903
946071AF1-272 C
Adder
-5.752941176470588-4.89
966771AG1-548 C
Adder
7.2282352941176476.144
966772AG1-548 E
Adder
16.86470588235294314.335
961581Q1080_CY23
External Queue
60.49292373657226660.492923736572266
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1430.143
CBM NorthLTFEXP_CBM-N->PJM
CBM
11.13311.133
CBM West 1LTFEXP_CBM-W1->PJM
CBM
10.98910.989
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2652.265
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6620.662
LGEELTFEXP_LGEE->PJM
CLTF
0.2480.248
WECLTFEXP_WEC->PJM
CLTF
0.1760.176
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0810.081
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0230.023
TVALTFEXP_TVA->PJM
CLTF
0.3270.327
MECLTFEXP_MEC->PJM
CLTF
0.7410.741
LAGNLTFEXP_LAGN->PJM
CLTF
0.4450.445
SIGELTFEXP_SIGE->PJM
CLTF
0.0450.045
O66PJM->LTFIMP_O-066
CMTX_NF
3.4523.452

Details for 26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line l/o PN_P2-3_PN-230-0347-2_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-2_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.62 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:995.86
MW Contribution:22.71
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line
Contingency Name:
PN_P2-3_PN-230-0347-2_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.18 %
Rating:980.0 MVA
Rating Type:B
MVA to Mitigate:1001.38
MW Contribution:22.7
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
1.81411764705882361.542
961972AG1-040 E
Adder
1.20941176470588241.028
962511AG1-100 C
Adder
1.73176470588235291.472
962512AG1-100 E
Adder
1.15411764705882350.981
962912AG1-140 E
Adder
0.121176470588235290.103
963441AG1-193 C
Adder
1.05294117647058830.895
963442AG1-193 E
Adder
0.70235294117647060.597
963481AG1-197 C
Adder
1.37411764705882341.168
963482AG1-197 E
Adder
0.91647058823529410.779
963491AG1-198 C
Adder
1.09882352941176480.934
963492AG1-198 E
Adder
0.73294117647058820.623
963992AG1-253 E
Adder
0.191764705882352950.163
964201AG1-281 C
Adder
3.623.077
964202AG1-281 E
Adder
2.41294117647058842.051
964391AG1-301 C
Adder
2.4388235294117652.073
964392AG1-301 E
Adder
1.62588235294117631.382
290086Q-036 E
Adder
27.34352941176470623.242
296332R-032 E
50/50
21.5121.51
942351AE2-248 C
Adder
1.40588235294117661.195
942352AE2-248 E
Adder
0.93764705882352950.797
942491AE2-262 C
Adder
8.0164705882352956.814
942492AE2-262 E
Adder
5.38705882352941154.579
942501AE2-263 C
Adder
7.535294117647066.405
942502AE2-263 E
Adder
5.0317647058823534.277
942811AE2-299 C
Adder
4.7129411764705884.006
942812AE2-299 E
Adder
18.85294117647058716.025
942961AE2-316 C
Adder
7.4294117647058836.315
942962AE2-316 E
Adder
8.7988235294117657.479
943151AE2-344 C
Adder
10.0670588235294138.557
943152AE2-344 E
Adder
6.7105882352941175.704
943352AF1-006 E
Adder
0.98235294117647050.835
943712AF1-039 E O1
Adder
1.21.02
944261AF1-094 C
Adder
1.8317647058823531.557
944262AF1-094 E
Adder
1.22117647058823531.038
944691AF1-134 C
Adder
2.9341176470588242.494
944692AF1-134 E
Adder
1.95647058823529421.663
944752AF1-140 E
50/50
2.1352.135
944781AF1-143 C
Adder
15.70000000000000113.345
944782AF1-143 E
Adder
8.3729411764705887.117
945021AF1-167 C
Adder
1.3529411764705881.15
945022AF1-167 E
Adder
0.90235294117647060.767
958742AF2-165 E
Adder
1.35882352941176481.155
959471AF2-238 C
Adder
2.1552941176470591.832
959472AF2-238 E
Adder
1.43647058823529421.221
960031AF2-294 C
Adder
1.68117647058823551.429
960032AF2-294 E
Adder
1.12117647058823520.953
960051AF2-296 C
Adder
2.9341176470588242.494
960052AF2-296 E
Adder
1.95647058823529421.663
20050326C.SLOPE
50/50
2.7852.785
20063626IUP CO-G
50/50
0.790.79
20079426CONEMAGH
50/50
0.6270.627
20080926SITHE
50/50
2.5982.598
20083526ARN_Z1-066
Adder
2.0929411764705881.779
20083726HOMER C1
50/50
273.814273.814
20083826HOMER C2
50/50
229.662229.662
20083926HOMER C3
50/50
243.127243.127
20084626FORWARD
50/50
0.1820.182
20085226WARR RDG
Adder
0.50823529411764710.432
200864K-013 E
50/50
9.1259.125
200883Q-053 E
Adder
9.6505882352941178.203
20088826HIGHLAND
50/50
0.4570.457
20088926STNY CRK
50/50
0.4450.445
20089426K02
Adder
8.26.97
20092526R32
50/50
0.7170.717
20215826CON.GEN1
50/50
0.1330.133
203999P-047 E
Adder
16.34941176470588413.897
23682801GRAYMONT
Adder
0.59294117647058830.504
292350K-023
Adder
6.7094117647058835.703
292542L-013 1
Adder
8.3729411764705887.117
293301N-039 E
Adder
17.0152941176470614.463
293393V3-030E
Adder
7.8447058823529416.668
293603O-018 E
50/50
18.78318.783
293902O-048 E
Adder
7.5364705882352946.406
294515O38_P22
Adder
16.19176470588235313.763
294903P-060 E
50/50
14.09714.097
916202Z1-069 E
Adder
16.49764705882352814.023
940201AE2-001 C
Adder
1.78235294117647051.515
940202AE2-001 E
Adder
1.1882352941176471.01
940861AE2-074 C
Adder
3.537647058823533.007
940862AE2-074 E
Adder
4.6564705882352953.958
941232AE2-117 E
Adder
1.66000000000000011.411
941241AE2-118 C
Adder
2.65764705882352952.259
941242AE2-118 E
Adder
1.7717647058823531.506
941322AE2-126 E
Adder
1.56235294117647071.328
941332AE2-129 E
Adder
1.77764705882352941.511
941352AE2-131 E
Adder
1.77764705882352941.511
941421AE2-139 C
Adder
8.1741176470588256.948
941422AE2-139 E
Adder
5.4494117647058824.632
946222AF1-287 E
Adder
1.15764705882352950.984
946381AF1-302 C
Adder
3.2458823529411762.759
946382AF1-302 E
Adder
4.3270588235294123.678
957161AF2-010 C
Adder
7.06000000000000056.001
957162AF2-010 E
Adder
4.7576470588235294.044
957451AF2-039 C
Adder
1.58235294117647051.345
957452AF2-039 E
Adder
1.0552941176470590.897
957941AF2-088 C
Adder
0.76235294117647070.648
957942AF2-088 E
Adder
0.50823529411764710.432
957981AF2-092 C
50/50
2.3782.378
957982AF2-092 E
50/50
1.5851.585
958362AF2-130 E
Adder
1.49058823529411751.267
20083326SEWRDB34
50/50
34.6234.62
959301AF2-221 C
50/50
2.2222.222
959302AF2-221 E
50/50
3.0683.068
913142Y1-033 E OP1
Adder
6.6576470588235295.659
957012AF2-002 E
50/50
1.41.4
203940AF1-140 C
50/50
3.2033.203
203946AE2-131 C
Adder
2.66705882352941172.267
203948AG1-140 C
Adder
0.26470588235294120.225
203955AF1-039 C O1
Adder
1.79882352941176471.529
203962AF1-287 C
Adder
1.73647058823529421.476
203963AG1-253 C
Adder
0.397647058823529460.338
293432R-040 E
Adder
0.47058823529411770.4
91600426SW_E13_K22
Adder
2.5211764705882352.143
957001AF2-001 C
50/50
4.24.2
957002AF2-001 E
50/50
2.82.8
957011AF2-002 C
50/50
2.12.1
957561AF2-050 C
Adder
9.0670588235294117.707
957562AF2-050 E
Adder
6.0447058823529415.138
942126AE2-224 E
Adder
12.08941176470588310.276
941191AE2-113 C
Adder
13.65058823529411711.603
941192AE2-113 E
Adder
12.81176470588235410.89
944182AF1-086 E
Adder
25.15176470588235321.379
944301AF1-098 C
Adder
7.2058823529411776.125
944302AF1-098 E
Adder
4.8047058823529414.084
944881AF1-153 C
Adder
2.1435294117647061.822
944882AF1-153 E
Adder
1.42941176470588241.215
946071AF1-272 C
50/50
25.825.8
946072AF1-272 E
50/50
17.217.2
946571AF1-321 C
50/50
4.24.2
946572AF1-321 E
50/50
2.82.8
962411AG1-090 C
Adder
6.6670588235294125.667
962412AG1-090 E
Adder
14.44470588235294212.278
965121AG1-377 C
Adder
1.33294117647058831.133
965122AG1-377 E
Adder
3.1105882352941182.644
965131AG1-378 C
Adder
1.33294117647058831.133
965132AG1-378 E
Adder
3.1105882352941182.644
966771AG1-548 C
Adder
6.8117647058823535.79
966772AG1-548 E
Adder
15.89411764705882413.51
20391526BF_Z2-108
Adder
5.5411764705882354.71
235003AC1-025 E
Adder
0.25764705882352940.219
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.2950.295
CBM NorthLTFEXP_CBM-N->PJM
CBM
8.788.78
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.7562.756
G-007PJM->LTFIMP_G-007
CMTX_NF
0.5210.521
WECLTFEXP_WEC->PJM
CLTF
0.0240.024
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.2320.232
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.210.21
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1120.112
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
0.0370.037
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.0070.007
MECLTFEXP_MEC->PJM
CLTF
0.040.04
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.0230.023
O66PJM->LTFIMP_O-066
CMTX_NF
2.6332.633
CONTINGENCY 'PN_P2-3_PN-230-0183-210_SRT-A'
 DISCONNECT BRANCH FROM BUS 200767 TO BUS 200769 TO BUS 202640 CKT N /*26HOMER CT   230.0 - 26HOMER CY   345.0 - 26HOMERCITYN  23.0
 DISCONNECT BRANCH FROM BUS 200767 TO BUS 200807 CKT 1          /*26HOMER CT   230.0 - 26PIERC230   230.0
 DISCONNECT BRANCH FROM BUS 200807 TO BUS 200808 CKT 1          /*26PIERC230   230.0 - 26PIERC138   138.0
 DISCONNECT BRANCH FROM BUS 200808 TO BUS 200809 CKT 1          /*26PIERC138   138.0 - 26SITHE      138.0
 REMOVE MACHINE 1 FROM BUS 200809                               /*26SITHE      138.0
END
CONTINGENCY 'PN_P2-2_PN-230-001T_SRT-A'
 DISCONNECT BRANCH FROM BUS 200767 TO BUS 200807 CKT 1          /*26HOMER CT   230.0 - 26PIERC230   230.0
 DISCONNECT BRANCH FROM BUS 200769 TO BUS 200767 TO BUS 202640 CKT N /*26HOMER CY   345.0 - 26HOMER CT   230.0 - 26HOMERCITYN  23.0
 DISCONNECT BUS 200807                                          /*26PIERC230   230.0
 DISCONNECT BUS 200808                                          /*26PIERC138   138.0
 DISCONNECT BUS 200809                                          /*26SITHE      138.0
 REMOVE MACHINE 1 FROM BUS 200809                               /*26SITHE      138.0
END
CONTINGENCY 'PN_P2-3_PN-230-0347-2_SRT-A'
 OPEN BRANCH FROM BUS 200793 TO BUS 200741 CKT 9   /*26SEWARD 2   230.0 - 26SEWARD     115.0
 OPEN BRANCH FROM BUS 200793 TO BUS 200912 CKT 1   /*26SEWARD 2   230.0 - 26CONEMAGH   230.0
END
CONTINGENCY 'PN_P2-3_PN-230-0347-A_SRT-A'
 OPEN BRANCH FROM BUS 200793 TO BUS 200767 CKT 1   /*26SEWARD 2   230.0 - 26HOMER CT   230.0
 OPEN BRANCH FROM BUS 200793 TO BUS 200912 CKT 1   /*26SEWARD 2   230.0 - 26CONEMAGH   230.0
END
999310 to 200767 ckt S
200767 to 200795 ckt 1
200769 to 999310 ckt S
200795 to 200810 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1AP
01GAR RN-01COLMBGPN 138.0 kV Ckt 1 line
PN_P1-2_PN-345-107T_SRT-A
OPAC100.73 %151.0B152.112.56
GD1PENELEC
26HOMER CT _-26HOMER CT 230.0 kV Ckt N line
PN_P1-3_DRT-230-004-DRT_SRT-SL
OPAC100.67 %854.0B859.6923.97
GD1PENELEC
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Base Case
OPAC105.47 %809.0A853.2615.76

Details for 01GAR RN-01COLMBGPN 138.0 kV Ckt 1 line l/o PN_P1-2_PN-345-107T_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AP
Facility Description:
01GAR RN-01COLMBGPN 138.0 kV Ckt 1 line
Contingency Name:
PN_P1-2_PN-345-107T_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.73 %
Rating:151.0 MVA
Rating Type:B
MVA to Mitigate:152.1
MW Contribution:12.56
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:AP
Facility Description:
01GAR RN-01COLMBGPN 138.0 kV Ckt 1 line
Contingency Name:
PN_P1-2_PN-345-107T_SRT-A
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:98.2 %
Rating:151.0 MVA
Rating Type:B
MVA to Mitigate:148.28
MW Contribution:12.57
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
1.02235294117647070.869
961972AG1-040 E
Adder
0.68117647058823530.579
962511AG1-100 C
Adder
1.00117647058823530.851
962512AG1-100 E
Adder
0.66705882352941170.567
962912AG1-140 E
Adder
0.063529411764705890.054
963441AG1-193 C
Adder
0.55764705882352940.474
963442AG1-193 E
Adder
0.371764705882352940.316
963481AG1-197 C
Adder
0.77058823529411770.655
963482AG1-197 E
Adder
0.51411764705882360.437
963491AG1-198 C
Adder
0.60705882352941180.516
963492AG1-198 E
Adder
0.404705882352941140.344
963992AG1-253 E
Adder
0.10.085
942811AE2-299 C
Adder
2.46588235294117642.096
942812AE2-299 E
Adder
9.862352941176478.383
942961AE2-316 C
50/50
4.3484.348
942962AE2-316 E
50/50
5.155.15
943151AE2-344 C
Adder
5.7941176470588234.925
943152AE2-344 E
Adder
3.86235294117647053.283
943352AF1-006 E
Adder
0.58117647058823530.494
944261AF1-094 C
Adder
1.01058823529411760.859
944262AF1-094 E
Adder
0.67411764705882350.573
945021AF1-167 C
50/50
1.0131.013
945022AF1-167 E
50/50
0.6750.675
958742AF2-165 E
Adder
0.72117647058823530.613
20060826PINEY #1
50/50
0.50.5
20083826HOMER C2
Adder
32.7482352941176527.836
20083926HOMER C3
Adder
34.6682352941176529.468
23503001MHNG-T155
50/50
0.1920.192
23513401AL&D6
50/50
0.2030.203
916202Z1-069 E
Adder
3.72117647058823533.163
940861AE2-074 C
Adder
0.82470588235294120.701
940862AE2-074 E
Adder
1.08588235294117650.923
941322AE2-126 E
Adder
0.44705882352941180.38
946222AF1-287 E
Adder
0.66352941176470580.564
946381AF1-302 C
50/50
1.91.9
946382AF1-302 E
50/50
2.5332.533
957161AF2-010 C
Adder
3.8917647058823533.308
957162AF2-010 E
Adder
2.62235294117647082.229
957451AF2-039 C
Adder
0.40941176470588230.348
957452AF2-039 E
Adder
0.272941176470588240.232
957941AF2-088 C
Adder
0.196470588235294150.167
957942AF2-088 E
Adder
0.131764705882352950.112
958362AF2-130 E
Adder
0.78823529411764710.67
203932AE1-123
50/50
0.2980.298
203948AG1-140 C
Adder
0.13882352941176470.118
203962AF1-287 C
Adder
0.99411764705882360.845
203963AG1-253 C
Adder
0.208235294117647050.177
941191AE2-113 C
Adder
3.68117647058823533.129
941192AE2-113 E
Adder
3.45529411764705862.937
944301AF1-098 C
Adder
3.7152941176470593.158
944302AF1-098 E
Adder
2.4764705882352942.105
944881AF1-153 C
Adder
0.860.731
944882AF1-153 E
Adder
0.57294117647058830.487
966771AG1-548 C
Adder
3.7682352941176473.203
966772AG1-548 E
Adder
8.7917647058823527.473
CBM NorthLTFEXP_CBM-N->PJM
CBM
2.7582.758
G-007ALTFEXP_G-007A->PJM
CMTX
1.8631.863
VTFLTFEXP_VFT->PJM
CMTX
5.1265.126
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.9510.951
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.1980.198
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1290.129
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
1.261.26
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.2790.279
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.8680.868
MDUPJM->LTFIMP_MDU
CLTF
0.0510.051
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.4970.497
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.2450.245

Details for 26HOMER CT _-26HOMER CT 230.0 kV Ckt N line l/o PN_P1-3_DRT-230-004-DRT_SRT-SL


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT _-26HOMER CT 230.0 kV Ckt N line
Contingency Name:
PN_P1-3_DRT-230-004-DRT_SRT-SL
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:100.67 %
Rating:854.0 MVA
Rating Type:B
MVA to Mitigate:859.69
MW Contribution:23.97
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT _-26HOMER CT 230.0 kV Ckt N line
Contingency Name:
PN_P1-3_DRT-230-004-DRT_SRT-SL
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:102.04 %
Rating:854.0 MVA
Rating Type:B
MVA to Mitigate:871.45
MW Contribution:23.96
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
2.06941176470588231.759
961972AG1-040 E
Adder
1.37882352941176461.172
962511AG1-100 C
Adder
1.98352941176470581.686
962512AG1-100 E
Adder
1.32235294117647071.124
962912AG1-140 E
Adder
0.139999999999999990.119
963441AG1-193 C
Adder
1.07764705882352940.916
963442AG1-193 E
Adder
0.71764705882352940.61
963481AG1-197 C
Adder
1.56588235294117651.331
963482AG1-197 E
Adder
1.04352941176470580.887
963491AG1-198 C
Adder
1.1482352941176470.976
963492AG1-198 E
Adder
0.76588235294117660.651
963992AG1-253 E
Adder
0.22235294117647060.189
942491AE2-262 C
Adder
4.1211764705882353.503
942492AE2-262 E
Adder
2.76941176470588252.354
942501AE2-263 C
Adder
3.8741176470588243.293
942502AE2-263 E
Adder
2.58588235294117652.198
942811AE2-299 C
Adder
5.484.658
942812AE2-299 E
Adder
21.9218.632
942961AE2-316 C
Adder
6.622352941176475.629
942962AE2-316 E
Adder
7.8435294117647066.667
943151AE2-344 C
Adder
11.5223529411764729.794
943152AE2-344 E
Adder
7.6823529411764716.53
943352AF1-006 E
Adder
1.1317647058823530.962
944261AF1-094 C
Adder
1.91411764705882351.627
944262AF1-094 E
Adder
1.2764705882352941.085
945021AF1-167 C
Adder
1.19882352941176461.019
945022AF1-167 E
Adder
0.80.68
958742AF2-165 E
Adder
1.18117647058823531.004
959471AF2-238 C
50/50
2.5832.583
959472AF2-238 E
50/50
1.7221.722
960031AF2-294 C
Adder
2.07764705882352941.766
960032AF2-294 E
Adder
1.38470588235294121.177
20064226SENECA#1
50/50
7.897.89
20064326SENECA#2
50/50
7.3857.385
20082826HNSMLK 1
50/50
2.2082.208
20082926HNSMLK 2
50/50
2.2082.208
20083026HNSMLK 3
50/50
2.2082.208
20083126HNSMLK 4
50/50
2.2082.208
20083226HNSMLK 5
50/50
2.2082.208
20083826HOMER C2
50/50
321.898321.898
20083926HOMER C3
50/50
340.771340.771
20088726ARMNA MT
50/50
0.5880.588
20089426K02
Adder
7.4152941176470596.303
20326126BLOSSBCT
50/50
0.8010.801
20334926Z1-069 C
50/50
0.7760.776
20335026MILZ1-092
50/50
0.7660.766
203999P-047 E
50/50
20.19120.191
916202Z1-069 E
50/50
20.24420.244
940861AE2-074 C
50/50
4.2814.281
940862AE2-074 E
50/50
5.6355.635
941322AE2-126 E
Adder
0.94000000000000010.799
941421AE2-139 C
Adder
8.7317647058823547.422
941422AE2-139 E
Adder
5.8211764705882364.948
946222AF1-287 E
Adder
1.32352941176470581.125
946381AF1-302 C
Adder
2.89294117647058832.459
946382AF1-302 E
Adder
3.8576470588235293.279
957161AF2-010 C
Adder
7.3305882352941186.231
957162AF2-010 E
Adder
4.93999999999999954.199
958362AF2-130 E
Adder
1.12941176470588230.96
959301AF2-221 C
Adder
-0.9752941176470588-0.829
203940AF1-140 C
Adder
-1.2517647058823531-1.064
203948AG1-140 C
Adder
0.308235294117647050.262
203955AF1-039 C O1
Adder
-0.8388235294117646-0.713
203962AF1-287 C
Adder
1.98470588235294131.687
203963AG1-253 C
Adder
0.462352941176470630.393
294573P-028 E
Adder
15.32705882352941313.028
941191AE2-113 C
50/50
14.19714.197
941192AE2-113 E
50/50
13.32513.325
944301AF1-098 C
Adder
8.1164705882352956.899
944302AF1-098 E
Adder
5.4105882352941184.599
944881AF1-153 C
Adder
1.58470588235294121.347
944882AF1-153 E
Adder
1.05647058823529430.898
946071AF1-272 C
Adder
-5.7176470588235295-4.86
966771AG1-548 C
Adder
7.1905882352941186.112
966772AG1-548 E
Adder
16.77882352941176714.262
961581Q1080_CY23
External Queue
60.1631889343261760.16318893432617
CBM NorthLTFEXP_CBM-N->PJM
CBM
11.07911.079
CBM West 1LTFEXP_CBM-W1->PJM
CBM
11.01611.016
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.2872.287
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.6530.653
LGEELTFEXP_LGEE->PJM
CLTF
0.2490.249
WECLTFEXP_WEC->PJM
CLTF
0.1770.177
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0770.077
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.0210.021
TVALTFEXP_TVA->PJM
CLTF
0.3320.332
MECLTFEXP_MEC->PJM
CLTF
0.7450.745
LAGNLTFEXP_LAGN->PJM
CLTF
0.4520.452
SIGELTFEXP_SIGE->PJM
CLTF
0.0450.045
O66PJM->LTFIMP_O-066
CMTX_NF
3.3983.398
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1390.139

Details for 26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:105.47 %
Rating:809.0 MVA
Rating Type:A
MVA to Mitigate:853.26
MW Contribution:15.76
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:105.11 %
Rating:809.0 MVA
Rating Type:A
MVA to Mitigate:850.35
MW Contribution:15.76
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
1.30588235294117671.11
961972AG1-040 E
Adder
0.87058823529411770.74
962511AG1-100 C
Adder
1.24941176470588241.062
962512AG1-100 E
Adder
0.83294117647058820.708
962912AG1-140 E
Adder
0.089411764705882360.076
963441AG1-193 C
Adder
0.71411764705882350.607
963442AG1-193 E
Adder
0.475294117647058870.404
963481AG1-197 C
Adder
0.98823529411764710.84
963482AG1-197 E
Adder
0.65882352941176480.56
963491AG1-198 C
Adder
0.75882352941176480.645
963492AG1-198 E
Adder
0.50588235294117640.43
963992AG1-253 E
Adder
0.14117647058823530.12
964201AG1-281 C
50/50
2.312.31
964202AG1-281 E
50/50
1.541.54
964391AG1-301 C
Adder
1.5964705882352941.357
964392AG1-301 E
Adder
1.06470588235294120.905
290086Q-036 E
Adder
17.06823529411764514.508
296332R-032 E
50/50
13.78213.782
942351AE2-248 C
Adder
0.94705882352941180.805
942352AE2-248 E
Adder
0.63058823529411770.536
942491AE2-262 C
Adder
5.3941176470588244.585
942492AE2-262 E
Adder
3.62470588235294143.081
942501AE2-263 C
Adder
5.0705882352941174.31
942502AE2-263 E
Adder
3.3858823529411772.878
942811AE2-299 C
Adder
3.47764705882352932.956
942812AE2-299 E
Adder
13.91176470588235311.825
942961AE2-316 C
Adder
5.1411764705882364.37
942962AE2-316 E
Adder
6.0894117647058835.176
943151AE2-344 C
Adder
7.2705882352941186.18
943152AE2-344 E
Adder
4.8470588235294124.12
943352AF1-006 E
Adder
0.71294117647058820.606
943712AF1-039 E O1
Adder
0.78588235294117660.668
944261AF1-094 C
Adder
1.26470588235294111.075
944262AF1-094 E
Adder
0.84235294117647050.716
944691AF1-134 C
Adder
1.29411764705882361.1
944692AF1-134 E
Adder
0.86235294117647050.733
944752AF1-140 E
50/50
1.3591.359
944781AF1-143 C
50/50
10.39710.397
944782AF1-143 E
50/50
5.5455.545
945021AF1-167 C
Adder
0.84823529411764710.721
945022AF1-167 E
Adder
0.56470588235294120.48
958742AF2-165 E
Adder
0.84823529411764710.721
959471AF2-238 C
Adder
1.7247058823529411.466
959472AF2-238 E
Adder
1.14941176470588240.977
960031AF2-294 C
Adder
1.36352941176470591.159
960032AF2-294 E
Adder
0.90941176470588240.773
960051AF2-296 C
Adder
1.29411764705882361.1
960052AF2-296 E
Adder
0.86235294117647050.733
20050326C.SLOPE
50/50
1.7181.718
20079426CONEMAGH
50/50
0.3540.354
20080926SITHE
50/50
2.1782.178
20083426SW_E13_K22
50/50
0.0170.017
20083526ARN_Z1-066
50/50
1.3861.386
20083726HOMER C1
50/50
229.56229.56
20083826HOMER C2
50/50
189.739189.739
20083926HOMER C3
50/50
200.864200.864
20084626FORWARD
50/50
0.1230.123
20085226WARR RDG
Adder
0.332941176470588240.283
200864K-013 E
50/50
6.1416.141
200883Q-053 E
50/50
6.0396.039
20088726ARMNA MT
50/50
0.3830.383
20088826HIGHLAND
50/50
0.2930.293
20088926STNY CRK
50/50
0.2940.294
20089026BF_G21_K23
50/50
0.1360.136
20089126CSLMN_L13
50/50
0.1670.167
20089226LOOKOUT
50/50
0.1780.178
20089426K02
Adder
6.1400000000000015.219
20092526R32
50/50
0.4590.459
20222526SCI_S29B
50/50
0.0610.061
20334926Z1-069 C
50/50
0.5020.502
203999P-047 E
50/50
13.16513.165
23682801GRAYMONT
Adder
0.40.34
292350K-023
50/50
4.4434.443
292542L-013 1
50/50
5.5455.545
293301N-039 E
50/50
11.33411.334
293393V3-030E
Adder
3.59647058823529433.057
293603O-018 E
50/50
12.03412.034
293902O-048 E
50/50
4.9914.991
294515O38_P22
50/50
10.78510.785
294903P-060 E
50/50
9.3059.305
916202Z1-069 E
50/50
13.0913.09
940201AE2-001 C
Adder
1.21.02
940202AE2-001 E
Adder
0.80.68
940861AE2-074 C
50/50
2.7832.783
940862AE2-074 E
50/50
3.6643.664
941232AE2-117 E
Adder
1.08235294117647070.92
941241AE2-118 C
Adder
1.73176470588235291.472
941242AE2-118 E
Adder
1.15411764705882350.981
941322AE2-126 E
Adder
1.02941176470588250.875
941332AE2-129 E
Adder
1.10235294117647080.937
941352AE2-131 E
Adder
1.10235294117647080.937
941421AE2-139 C
Adder
6.4423529411764715.476
941422AE2-139 E
Adder
4.2941176470588233.65
946222AF1-287 E
Adder
0.83529411764705890.71
946381AF1-302 C
Adder
2.24588235294117671.909
946382AF1-302 E
Adder
2.99411764705882362.545
957161AF2-010 C
Adder
4.8552941176470594.127
957162AF2-010 E
Adder
3.2717647058823532.781
957451AF2-039 C
Adder
0.97058823529411760.825
957452AF2-039 E
Adder
0.64705882352941180.55
957941AF2-088 C
Adder
0.46705882352941180.397
957942AF2-088 E
Adder
0.311764705882352940.265
957981AF2-092 C
50/50
1.5451.545
957982AF2-092 E
50/50
1.031.03
958362AF2-130 E
Adder
0.8717647058823530.741
20083326SEWRDB34
50/50
21.09621.096
20088626ARWF_N39
50/50
0.3210.321
20091526CHSTN_FL
50/50
0.20.2
20303426NA_O38_P22
50/50
0.2640.264
959301AF2-221 C
50/50
1.4581.458
959302AF2-221 E
50/50
2.0142.014
913142Y1-033 E OP1
Adder
4.3635294117647063.709
957012AF2-002 E
50/50
0.9410.941
203940AF1-140 C
50/50
2.0382.038
203946AE2-131 C
Adder
1.65411764705882351.406
203948AG1-140 C
Adder
0.195294117647058840.166
203955AF1-039 C O1
Adder
1.17882352941176481.002
203962AF1-287 C
Adder
1.25411764705882361.066
203963AG1-253 C
Adder
0.292941176470588260.249
293432R-040 E
50/50
0.3120.312
294573P-028 E
Adder
10.9470588235294129.305
91600426SW_E13_K22
50/50
1.6791.679
957001AF2-001 C
50/50
2.8242.824
957002AF2-001 E
50/50
1.8831.883
957011AF2-002 C
50/50
1.4121.412
957561AF2-050 C
50/50
6.0546.054
957562AF2-050 E
50/50
4.0364.036
203961AE2-224 C
50/50
1.9781.978
942126AE2-224 E
50/50
8.0728.072
941191AE2-113 C
50/50
10.22110.221
941192AE2-113 E
50/50
9.5939.593
944182AF1-086 E
Adder
8.8341176470588237.509
944301AF1-098 C
Adder
5.2658823529411764.476
944302AF1-098 E
Adder
3.5105882352941182.984
944881AF1-153 C
Adder
1.45294117647058841.235
944882AF1-153 E
Adder
0.96941176470588230.824
946571AF1-321 C
50/50
2.8242.824
946572AF1-321 E
50/50
1.8831.883
962411AG1-090 C
Adder
4.1352941176470593.515
962412AG1-090 E
Adder
8.9588235294117657.615
965121AG1-377 C
Adder
0.82705882352941170.703
965122AG1-377 E
Adder
1.92941176470588241.64
965131AG1-378 C
Adder
0.82705882352941170.703
965132AG1-378 E
Adder
1.92941176470588241.64
966771AG1-548 C
Adder
4.72941176470588154.02
966772AG1-548 E
Adder
11.035294117647069.38
235003AC1-025 E
Adder
0.172941176470588240.147
20391526BF_Z2-108
50/50
3.1193.119
961581Q1080_CY23
External Queue
32.49358749389648432.493587493896484
CBM NorthLTFEXP_CBM-N->PJM
CBM
7.8247.824
G-007ALTFEXP_G-007A->PJM
CMTX
1.1391.139
VTFLTFEXP_VFT->PJM
CMTX
3.393.39
COTTONWOODPJM->LTFIMP_COTTONWOOD
CLTF
0.9320.932
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.3050.305
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.1820.182
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
1.0451.045
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.2320.232
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.7220.722
MDUPJM->LTFIMP_MDU
CLTF
0.0390.039
LTFEXP_AC1-056LTFEXP_AC1-056->LTFIMP_AC1-056
CLTF
0.3910.391
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.4020.402
CONTINGENCY 'PN_P1-2_PN-345-107T_SRT-A'
 DISCONNECT BRANCH FROM BUS 200599 TO BUS 239082 CKT 1   /*26ERIE W     345.0 - 02S8-ATT     345.0
END
CONTINGENCY 'PN_P1-3_DRT-230-004-DRT_SRT-SL'
 DISCONNECT BRANCH FROM BUS 200769 TO BUS 200767 TO BUS 202641 CKT S /*26HOMER CY   345.0 - 26HOMER CT   230.0 - 26HOMERCITYS  23.0
 SET POSTCONTRATING 1434 BRANCH FROM BUS 200769 TO BUS 961580 CKT 1 /*26HOMER CY   345.0 - Q1080 TAP    345.0
END
235282 to 235240 ckt 1
999311 to 200767 ckt N
200767 to 200795 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD1PENELEC
26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt N transformer
PN_P1-3_DRT-230-004-DRT_SRT-SL
OPAC101.35 %854.0B865.5523.96

Details for 26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt N transformer l/o PN_P1-3_DRT-230-004-DRT_SRT-SL


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PENELEC
Facility Description:
26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt N transformer
Contingency Name:
PN_P1-3_DRT-230-004-DRT_SRT-SL
Contingency Type:OP
DC|AC:AC
Final Cycle Loading:101.35 %
Rating:854.0 MVA
Rating Type:B
MVA to Mitigate:865.55
MW Contribution:23.96
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeFull MW ContributionGenDeliv MW Contribution
961971AG1-040 C
Adder
2.0682352941176471.758
961972AG1-040 E
Adder
1.37882352941176461.172
962511AG1-100 C
Adder
1.98352941176470581.686
962512AG1-100 E
Adder
1.32235294117647071.124
962912AG1-140 E
Adder
0.139999999999999990.119
963441AG1-193 C
Adder
1.07647058823529430.915
963442AG1-193 E
Adder
0.71764705882352940.61
963481AG1-197 C
Adder
1.56588235294117651.331
963482AG1-197 E
Adder
1.04352941176470580.887
963491AG1-198 C
Adder
1.1482352941176470.976
963492AG1-198 E
Adder
0.76588235294117660.651
963992AG1-253 E
Adder
0.22235294117647060.189
942491AE2-262 C
Adder
4.1082352941176473.492
942492AE2-262 E
Adder
2.76117647058823532.347
942501AE2-263 C
Adder
3.86235294117647053.283
942502AE2-263 E
Adder
2.5788235294117652.192
942811AE2-299 C
Adder
5.4788235294117654.657
942812AE2-299 E
Adder
21.91647058823529518.629
942961AE2-316 C
Adder
6.615294117647065.623
942962AE2-316 E
Adder
7.8364705882352946.661
943151AE2-344 C
Adder
11.5211764705882369.793
943152AE2-344 E
Adder
7.6811764705882366.529
943352AF1-006 E
Adder
1.13058823529411770.961
944261AF1-094 C
Adder
1.91411764705882351.627
944262AF1-094 E
Adder
1.2764705882352941.085
945021AF1-167 C
Adder
1.19882352941176461.019
945022AF1-167 E
Adder
0.79882352941176480.679
958742AF2-165 E
Adder
1.18117647058823531.004
959471AF2-238 C
50/50
2.582.58
959472AF2-238 E
50/50
1.721.72
960031AF2-294 C
Adder
2.07529411764705871.764
960032AF2-294 E
Adder
1.3835294117647061.176
20064226SENECA#1
50/50
7.8587.858
20064326SENECA#2
50/50
7.3547.354
20082826HNSMLK 1
50/50
2.22.2
20082926HNSMLK 2
50/50
2.22.2
20083026HNSMLK 3
50/50
2.22.2
20083126HNSMLK 4
50/50
2.22.2
20083226HNSMLK 5
50/50
2.22.2
20083826HOMER C2
50/50
321.802321.802
20083926HOMER C3
50/50
340.67340.67
20088726ARMNA MT
50/50
0.5850.585
20089426K02
Adder
7.46.29
20326126BLOSSBCT
50/50
0.7970.797
20334926Z1-069 C
50/50
0.7730.773
20335026MILZ1-092
50/50
0.7630.763
203999P-047 E
50/50
20.1720.17
916202Z1-069 E
50/50
20.2320.23
940861AE2-074 C
50/50
4.2784.278
940862AE2-074 E
50/50
5.6325.632
941322AE2-126 E
Adder
0.93764705882352950.797
941421AE2-139 C
Adder
8.7141176470588247.407
941422AE2-139 E
Adder
5.80941176470588254.938
946222AF1-287 E
Adder
1.32352941176470581.125
946381AF1-302 C
Adder
2.89058823529411772.457
946382AF1-302 E
Adder
3.85411764705882343.276
957161AF2-010 C
Adder
7.3282352941176476.229
957162AF2-010 E
Adder
4.9388235294117654.198
958362AF2-130 E
Adder
1.12941176470588230.96
959301AF2-221 C
Adder
-0.9764705882352941-0.83
203940AF1-140 C
Adder
-1.2541176470588236-1.066
203948AG1-140 C
Adder
0.308235294117647050.262
203955AF1-039 C O1
Adder
-0.8411764705882353-0.715
203962AF1-287 C
Adder
1.98470588235294131.687
203963AG1-253 C
Adder
0.462352941176470630.393
294573P-028 E
Adder
15.28470588235294312.992
941191AE2-113 C
50/50
14.18614.186
941192AE2-113 E
50/50
13.31513.315
944301AF1-098 C
Adder
8.1141176470588256.897
944302AF1-098 E
Adder
5.4094117647058824.598
944881AF1-153 C
Adder
1.58235294117647051.345
944882AF1-153 E
Adder
1.0552941176470590.897
946071AF1-272 C
Adder
-5.729411764705882-4.87
966771AG1-548 C
Adder
7.1894117647058826.111
966772AG1-548 E
Adder
16.7752941176470614.259
961581Q1080_CY23
External Queue
60.1731452941894560.17314529418945
CBM NorthLTFEXP_CBM-N->PJM
CBM
11.0311.03
CBM West 1LTFEXP_CBM-W1->PJM
CBM
11.84511.845
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.6692.669
CBM South 1LTFEXP_CBM-S1->PJM
CBM
00
G-007PJM->LTFIMP_G-007
CMTX_NF
0.7020.702
LGEELTFEXP_LGEE->PJM
CLTF
0.2830.283
WECLTFEXP_WEC->PJM
CLTF
0.1940.194
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.0480.048
TVALTFEXP_TVA->PJM
CLTF
0.4220.422
MECLTFEXP_MEC->PJM
CLTF
0.8310.831
LAGNLTFEXP_LAGN->PJM
CLTF
0.5590.559
SIGELTFEXP_SIGE->PJM
CLTF
0.0510.051
O66PJM->LTFIMP_O-066
CMTX_NF
3.713.71
LTFEXP_AC1-131LTFEXP_AC1-131->LTFIMP_AC1-131
CLTF
0.1050.105
CONTINGENCY 'PN_P1-3_DRT-230-004-DRT_SRT-SL'
 DISCONNECT BRANCH FROM BUS 200769 TO BUS 200767 TO BUS 202641 CKT S /*26HOMER CY   345.0 - 26HOMER CT   230.0 - 26HOMERCITYS  23.0
 SET POSTCONTRATING 1434 BRANCH FROM BUS 200769 TO BUS 961580 CKT 1 /*26HOMER CY   345.0 - Q1080 TAP    345.0
END
200769 to 999311 ckt N

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Light Load Analysis

The New Service Request AG1-548 was evaluated as a 25.0 MW injection and 25.0 MW withdrawal in the PENELEC area.

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Light Load Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Short Circuit Analysis

Based on PJM’s Short Circuit Analysis, this project did not contribute >1% fault duty to previously identified overdutied breakers, nor did it cause any new overdutied breakers.

Stability Analysis

Analysis Complete - No Issues

PSSE Dynamic Study Analysis

 

Executive Summary

 

New Service Request projects in PJM Transition Cycle 1, Cluster 69 are listed in Table 1 below. The report covers the dynamic analysis of Cluster 69 projects.

 

The analysis is effectively a screening study to determine whether the addition of the Cluster 69 projects will meet the dynamics requirements of the NERC, First Energy (FE), and PJM reliability standards.

 

The load flow scenario for the analysis was based on the RTEP 2027 summer peak load case, modified to include applicable projects. Cluster 69 projects have been dispatched online at maximum power output, with approximately unity power factor at the high side of the GSUs, 1.02 pu voltage at the generator terminals, and 1.01 pu voltage at the AF2-010 POI bus, and 1.01 pu voltage at the AG1-548 POI bus.

 

Cluster 69 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. Steady-state condition and 81 contingencies were studied, each with a 20 second simulation time period (with 1.0 second initial run prior to any events). Studied faults included:

a)  Steady-state operation (Category P0);

b)  Three-phase faults with normal clearing time (Category P1);

c)  Single-phase faults with stuck breaker (Category P4);

d)  Single phase faults placed at 80% of the line with delayed (Zone 2) clearing at line end remote from the fault due to primary communications/relay failure (Category P5).

No multiple-circuit tower line faults were identified for this study.

High Speed Reclosing (HSR) facilities were found in the vicinity of TC1 Cluster 69 projects.

 

For all simulations, the projects under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance. For 75 out of 81 fault contingencies tested on the 2027 peak load case:

a)  Cluster 69 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),

b)  The system with Cluster 69 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for inter-area modes and 4% for local modes.

c)  Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus).

d)  No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

AF2-010 was tripped during the fault application closed to their POIs as a result of fictitious frequency spikes at the frequency relay monitored bus, i.e., inverter terminal bus. Therefore, frequency protection in the model was disabled for faults close to the POI of the projects due to the deficiency of PSSE frequency calculation for inverter-based generation facilities. No more tripping issue of the AF2-010 was observed.

 

For P1.27, P4.12, P4.13, P4.14, P4.15, and P5.13, after losing 115 kV circuit from Erie South to AG1-548 POI, the results show undamped oscillations indicating system instability. The CSCR assessment shows under these fault contingencies, the CSCR values would be below 1.5 which could be considered very weak grid conditions. The PSSE dynamic analysis initially shows that system reinforcement is needed to resolve the undamped oscillations. However, after an electromagnetic transient (PSCAD) study was performed, the PPC setting were tuned. Further PSSE simulation shows that system is stable with adjusted PPC setting and no reinforcement is required.   

 

PSCAD Electromagnetic Study Analysis

 

Executive Summary

 

Electromagnetic transient model quality tests were performed for the 150 MW French Creek Solar and Storage project and the Union Solar project. PSCAD models were used to perform testing and analysis to ensure compliance with PJM requirements.

 

The French Creek Solar and Storage project located in Erie County, Pennsylvania was modeled with forty-two (42) Sungrow SG4400UD-US inverters and forty-two (42) step-up transformers for the photovoltaic generation portion; eight (8) Sungrow SC4400UD-US inverters and eight (8) step-up transformers for the battery energy storage system (BESS) portion; two (2) collection systems; one (1) main power transformer; and a 1-mile (5280 ft) transmission line connected to a 115 kV tap on the Erie South to Union City transmission line.

 

The Union Solar project located in Erie County, Pennsylvania was modeled with nineteen (19) SMA SC 4600-UP inverters and nineteen (19) step-up transformers, one (1) collection system, one (1) main power transformer, and a 0.02-mile transmission line connected to the 115 kV tap on Union City to Titusville transmission line.

 

Model quality tests for the French Creek Solar and Storage project, and the Union Solar project were performed for the following scenarios:

 

•  Flat Start Test Voltage Step-Down

•  Voltage Step-Up

•  Frequency Step-Down, No Headroom

•  Frequency Step-Up/Down, Headroom (@ 80% Pmax)

•  HVRT Leading (Legacy Curve)

•  HVRT Lagging (Legacy Curve)

•  LVRT Leading (Legacy Curve)

•  LVRT Lagging (Legacy Curve)

•  Voltage Ride Through (VRT)

•  Phase Angle Step-Down

•  Phase Angle Step-Up

•  System Strength Test

 

The French Creek Solar and Storage project PSCAD model, and the Union Solar project PSCAD model, with fine tuning, both passed all the model quality tests. The undamped oscillations identified in the PSSE dynamic study are not observed in the PSCAD study with a more detailed model. It is therefore concluded that undamped oscillations under P1.27, P4.12, P4.13, P4.14, P4.15, and P5.13 can be resolved with fine tuning of the plant.

 

Table 1: TC1 Cluster 69 Projects

Cluster

Project

Fuel Type

Transmission Owner

MFO

MWE

MWC

Point of Interconnection

69

AF2-010

Solar

FirstEnergy (Mid-Atlantic Interstate Transmission, LLC - Penelec Zone)

77 MW

77 MW

46 MW

Union City –Titusville 115 kV

69

AG1-548

Solar + Storage

FirstEnergy (Mid-Atlantic Interstate Transmission, LLC - Penelec Zone)

150 MW

150 MW

45 MW

Erie South -Union City 115 kV

 

Reactive Power Analysis

The reactive power capability of AG1-548 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AC1-025Dale SummitIn Service
AE2-001Nittany-Zion 46 kVSuspended
AE2-074Potter 46 kVUnder Construction
AE2-113Farmers Valley-Ridgeway 115 kVUnder Construction
AE2-117ABW Tap-Alexandria 46 kVSuspended
AE2-118ABW Tap-Williamsburg 46 kVSuspended
AE2-126Dubois-Curwensville 34.5 kVIn Service
AE2-129Philipsburg-Clarence 34.5 kVIn Service
AE2-131Philipsburg-Karthaus 34.5Under Construction
AE2-139East Towanda-Grover 230 kVEngineering & Procurement
AE2-224Bear Rock-Johnstown 230 kVIn Service
AE2-248Fillmore-Thompson Farm 46 kVSuspended
AE2-262Moshannon-Milesburg 230 kVEngineering & Procurement
AE2-263Moshannon-Milesburg 230 kV IIEngineering & Procurement
AE2-299Erie East 230 kVSuspended
AE2-316Brookville-Squab Hollow 138 kVUnder Construction
AE2-344Edinboro South-Venango Junction 115 kVSuspended
AF1-006Fairview East 34.5 kVIn Service
AF1-039Listonburg-Highpoint 24.9 kVIn Service
AF1-086Madera-Westover South 115 kVUnder Construction
AF1-094Union City-Cambridge Springs 34.5 kVEngineering & Procurement
AF1-098Four Mile Jct-Corry East 115 kVEngineering & Procurement
AF1-134Philipsburg-Madera 34.5 kVEngineering & Procurement
AF1-140Claysburg 23 kVEngineering & Procurement
AF1-143Lick Run 115 kVEngineering & Procurement
AF1-153Motion-Ridgeway 46 kVSuspended
AF1-167West Freedom-C&K Coal 25 kVSuspended
AF1-272Lucerne 115 kVEngineering & Procurement
AF1-287Edinboro South 34.5 kV IISuspended
AF1-302Brookville-Squab Hollow 138 kVEngineering & Procurement
AF1-321Hooversville 115 kV ISuspended
AF2-001Hooversville 115 kV IISuspended
AF2-002Hooversville 115 kV IIISuspended
AF2-010Union City-Titusville 115 kVActive
AF2-039Shawville-Clearfield 34.5 kVUnder Construction
AF2-050Bear Rock-Johnstown 230 kVActive
AF2-088Shawville-Clearfield 34.5 kV IIUnder Construction
AF2-092Snake Spring-Bedford Area 23 kVSuspended
AF2-130Cobalt Corners 34.5 kVIn Service
AF2-165Clark Summit-Emlenton 34.5 kVIn Service
AF2-221Scalp Level 22.9 kVSuspended
AF2-238Mansfield-South Troy 34.5 kVEngineering & Procurement
AF2-294Thompson 34.5 kVSuspended
AF2-296Madera 34.5 kVActive
AG1-040Morgan Street-Mount Hope 34.5 kVEngineering & Procurement
AG1-090Philipsburg 115 kVActive
AG1-100Venango-Saegertown 34.5 kVEngineering & Procurement
AG1-140Union City 34.5 kVSuspended
AG1-193Utica Junction 34.5 kVSuspended
AG1-197Morgan Street-Cochranton 34.5 kVSuspended
AG1-198Union City 34.5 kVUnder Construction
AG1-253Erie East-Union City 34.5 kVSuspended
AG1-281Claysburg-HCR Tap 46 kVEngineering & Procurement
AG1-301Miller REC-Warrior Ridge 46 kVEngineering & Procurement
AG1-377Philipsburg 115 kVActive
AG1-378Philipsburg 115 kVActive
V3-030St. Benedict-Patton 46kVIn Service
Y1-033Penn Mar-Rock Wood 115kVIn Service
Z1-069Gold-Sabinsville 115kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In accordance with PJM Tariff Part VII, Subpart D, section 312.A.1.b and as outlined in PJM Manual 14H, Section 13, in Phase III of the Cycle, PJM coordinates with the Affected System Operators to conduct any studies required to determine the impact of the New Service Request on any Affected System and will include the Affected System Study results in Phase III System Impact Study, if available from the Affected System Operator.

If your project required an Affected System Study, the results are shown below from the Affected System Operator.

For more details, please refer to your Affected System Study report by the Affected System Operator. If the Affected System Operator identified the need for a system reinforcement on their system due to their planning criteria, Project Developer must follow the Affected System Operator Tariff for construction of the network upgrade. PJM will list any required network upgrades identified by the Affected System Operator in the PJM Project Developer’s GIA under Schedule F.

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Final System Impact Study analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AG1-548 System Reinforcements:
TORTEP IDTitleCategoryAllocated Cost ($USD)Facilities Study
PENELECn9116.0Rebuild approximately 11 miles of the Homer City-Shelocta 230 kV line with double bundled 795 kcmil 26/7 ACSS conductorCost Allocated$11,340,309
PENELECn9119.0Reconductor/Rebuild the Shelocta – Keystone 230 kV Line, approximately 2.5 miles, with 1272 kcmil 45/7 ACSR 2-conductorCost Allocated$2,718,342
PENELECn9225.0Replace 230 kV substation conductor and line drops at Shelocta substation for the Homer City-Shelocta 230 kV line terminalCost Allocated$31,030
PENELECs3335.1Replace Homer City South 345/230-23kV TransformerContingent$0N/A
Grand Total:$14,089,681

PJM evaluated the impact of topology changing reinforcements to mitigate the impacts driven by New Service Requests. PJM determined which reinforcements were eliminated as a result of modeling the topology changing reinforcements. PJM then grouped the topology changing and eliminated reinforcements by region and computed a discount factor to apply to reinforcements to reduce the cost of all these reinforcements down to the cost of contstructing only the topology changing reinforcements. For additional details, please click the icon below

Regional Topology Upgrade Conversion

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n9116.0
Type
Load Flow
TO
PENELEC
RTEP ID / TO ID
n9116.0 / TC1-PN-001.d
Title
Rebuild approximately 11 miles of the Homer City-Shelocta 230 kV line with double bundled 795 kcmil 26/7 ACSS conductor
Description
Rebuild the Homer City – Shelocta 230 kV Line, approximately 11 miles, with double bunded 795 kcmil 26/7 ACSS conductor. Terminate new conductor at Homer City substation. Terminate new conductor at Shelocta substation.
Total Cost ($USD)
$39,312,233
Discounted Total Cost ($USD)
$39,312,233
Allocated Cost ($USD)
$11,340,309
Time Estimate
31 Months

Contributor

FacilityContingency
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A858.0 MVA
(All)B1037.0 MVA
(All)C1095.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-01010.7 MW14.9%$5,856,981
AF2-05014.7 MW20.4%$8,035,979
AG1-090 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
18.1 MW25.2%$9,906,974
AG1-377 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
3.8 MW5.3%$2,085,995
AG1-378 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
3.8 MW5.3%$2,085,995
AG1-54820.7 MW28.8%$11,340,309

System Reinforcement: n9119.0
Type
Load Flow
TO
PENELEC
RTEP ID / TO ID
n9119.0 / TC1-PN-003.b
Title
Reconductor/Rebuild the Shelocta – Keystone 230 kV Line, approximately 2.5 miles, with 1272 kcmil 45/7 ACSR 2-conductor
Description
Reconductor/Rebuild the Shelocta – Keystone 230 kV Line, approximately 2.5 miles, with 1272 kcmil 45/7 ACSR 2-conductor. Terminate new conductor at Keystone substation. Terminate new conductor at Shelocta substation.
Total Cost ($USD)
$9,533,592
Discounted Total Cost ($USD)
$9,533,592
Allocated Cost ($USD)
$2,718,342
Time Estimate
23 Months

Contributor

FacilityContingency
26SHELOCTA-26KEYSTONE 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A820.0 MVA
(All)B1044.0 MVA
(All)C1158.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-01011.8 MW14.8%$1,414,721
AF2-05015.1 MW19.0%$1,809,075
AG1-090 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
21.1 MW26.5%$2,527,390
AG1-377 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
4.4 MW5.6%$532,032
AG1-378 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
4.4 MW5.6%$532,032
AG1-54822.7 MW28.5%$2,718,342

System Reinforcement: n9225.0
Type
Load Flow
TO
PENELEC
RTEP ID / TO ID
n9225.0 / TC1-PN-001.e
Title
Replace 230 kV substation conductor and line drops at Shelocta substation for the Homer City-Shelocta 230 kV line terminal
Description
Replace 230 kV substation conductor and line drops at Shelocta substation for the Homer City-Shelocta 230 kV line terminal
Total Cost ($USD)
$107,569
Discounted Total Cost ($USD)
$107,569
Allocated Cost ($USD)
$31,030
Time Estimate
13 Months

Contributor

FacilityContingency
26HOMER CT-26SHELOCTA 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A913.0 MVA
(All)B1147.0 MVA
(All)C1318.0 MVA
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AF2-01010.7 MW14.9%$16,026
AF2-05014.7 MW20.4%$21,989
AG1-090 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
18.1 MW25.2%$27,108
AG1-377 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
3.8 MW5.3%$5,708
AG1-378 Philipsburg 115kV yard - Penelec: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-090, AG1-377, AG1-378
3.8 MW5.3%$5,708
AG1-54820.7 MW28.8%$31,030

System Reinforcement: s3335.1
Type
Load Flow
TO
PENELEC
RTEP ID / TO ID
s3335.1 / PN-2024-007
Title
Replace Homer City South 345/230-23kV Transformer
Description
Replace the South 345/230-23kV Transformer and associated equipment with: - One(1) 345/230kV Transformer with three single-phase units - Replace 345 kV circuit switcher, disconnects, circuit breaker, and substation conductor Transformer Ratings: - Before Proposed Solution: 649/836/793/984 MVA (SN/SLTE/WN/WLTE) - After Proposed Solution: 913/1147/1201/1376 MVA (SN/SLTE/WN/WLTE)
Cost Information
Time Estimate
Jun 01 2027

Contingent

Note: Although AG1-548 may not presently have cost responsibility for this upgrade, AG1-548 may need this upgrade in-service to be deliverable to the PJM system. If AG1-548 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
26HOMER CT-26HOMER CT _ 230.0 kV Ckt S line(Any)
Rating SetRating TypeRating Value
(All)A913.0 MVA
(All)B1147.0 MVA
WINA1201.0 MVA
WINB1376.0 MVA
26HOMER CY-26HOMER CT _ 345.0/230.0 kV Ckt S transformer(Any)
Rating SetRating TypeRating Value
(All)A913.0 MVA
(All)B1147.0 MVA
WINA1201.0 MVA
WINB1376.0 MVA

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AG1-548


AG1-548 Contributions into Topology or Eliminated Reinforcements:
TypeTORTEP ID / TO IDTitleTopo or ElimMW ImpactPercent AllocationCategoryAllocated Cost ($USD)
Contributions into Topology or Eliminated Reinforcement Total:$0
AG1-548 Contingent Region Topology Upgrades:
TORTEP IDTitleCategoryAllocated Cost ($USD)
Region Topology Upgrade Total:$0

Attachments

AG1-548 One Line Diagram

AG1-548 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.