AF1-125 Phase III Study Report

v1.00 released 2025-09-18 16:38

Oceana 230 kV

249.3 MW Capacity / 820.0 MW Energy

Introduction

This Phase III System Impact Study Report (PH3) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 312 for New Service Requests (projects) in Transition Cycle 1. The Project Developer/Eligible Customer (developer) is Virginia Electric and Power Company, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Virginia Electric and Power Company (Dominion Virginia Power).

Preface

New Service Requests meeting the requirements of Tariff, Part VII, Subpart D, Decision Point II, were included in the Phase III System Impact Study. The Phase III System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase III System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.7, PJM takes the following actions during the Phase III System Impact Study:
  1. PJM will retool load flow, short circuit and stability results based on decisions made by Project Developers or Eligible Customers during Decision Point II.
  2. PJM will coordinate with Affected System Operators to conduct any studies required to determine the final impact of a New Service Request on any Affected System and will include the final Affected System Study results in the Phase III System Impact Study, if available from the Affected System.
  3. The Phase III System Impact Study Results will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  4. PJM will tender draft final agreements to Project Developers or Eligible Customers.
The Transmission Owner takes the following actions during the Phase III System Impact Study:
  1. Verify Interconnection Facilities and Network Upgrades required to accommodate the New Service Request.
  2. Perform a Facilities Study. The Facilities Study in Phase III System Impact Study phase will be for the System Reliability Network Upgrades. The Facilities Study requirements are outlined in Attachment C of PJM Manual 14H. The study will be conducted pursuant to Tariff, Part VII, Subpart D, section 307(A)(7).

Decision Point III Requirements

At the close of Phase III System Impact Study, PJM will initiate Decision Point III (DP3). During DP3, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 313.A. Additional information on these elements is available in PJM Manual 14H sections 4.8, 6, and 7.

As stated in PJM Tariff, Part VII, Subpart D, section 313.C, New Service Requests may not be changed or modified in any way for any reason during Decision Point III. A New Service Request must be withdrawn and resubmitted in a subsequent Cycle to the extent a Project Developer or Eligible Customer wants to make any changes to such New Service Request at this point in the Cycle process.

Adverse Test Eligibility

This New Service Request does not meet the Adverse Study Impact Criteria and has the option to either move forward in the Cycle process or withdraw at DP3 with cumulative Readiness Deposits forfeited. See adverse study impact calculation below.

This section details whether a Project Developer or Eligible Customer qualifies for the Adverse Study Impact clause outlined in the PJM OATT, Part VII, Subpart D, section 313.B and Manual 14H, section 6.2.2. In order to qualify for an Adverse Study Impact at Decision Point III, the Network Upgrade cost from Phase II to Phase III must:

  1. Increase overall by 35% or more
  2. Increases by more than $25,000 per MW (Includes Costs identified in Affected System studies)

If a New Service Request meets the criteria above and chooses to withdraw the request, PJM will refund the cumulative Readiness Deposit amounts paid at the Application Phase, Decision Point I, and Decision Point II (RD1, and RD2 and RD3, respectively).

The below calculations show the computation of this New Service Request's Adverse Study Impact

DP3 Adverse Eligibility = DP3 Adverse Cost Alloc DP2 Adverse Cost Alloc > 1.35 AND ( DP3 Adverse Cost Alloc - DP2 Adverse Cost Alloc ) Project Size > $25,000 per MW
DP3 Adverse Eligibility = $493,685,021 $565,644,857 = 0.87 AND ( $493,685,021 - $565,644,857 ) 820.0 = $-87,756 per MW

General

The Project Developer has proposed a Offshore Wind generating facility located in the Virginia Electric and Power Company (Dominion Virginia Power) zone — City of Chesapeake County, Virginia. The installed facilities will have a total capability of 820.0 MW with 249.3 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AF1-125
Project Name:
Oceana 230 kV
Project Developer Name:
Virginia Electric and Power Company
State:
Virginia
County:
City of Chesapeake
Transmission Owner:
Virginia Electric and Power Company (Dominion Virginia Power)
MFO:
820.0
MWE:
820.0
MWC:
249.3
Fuel Type:
Offshore Wind
Basecase Study Year:
2027

Physical Interconnection Facility Study

Report Available

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AF1-123, AF1-124 and AF1-125 will interconnect on the Dominion transmission system at the Harpers (Oceana) 230 kV Substation.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In Phase III SIS, the interconnected Transmission Owner has performed a facilities study for the required System Reliability Network Upgrades. The Facilities Studies for the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades were performed by the Transmission Owner in Phase II and are available for download on PJM.com (see General Section for document links).

Based on the Phase III SIS results, the AF1-125 project has the following allocation of costs for interconnection. The Security amount required at DP3 is also shown below.

Cost Summary
Description Cost Allocated to AF1-125 Cost Subject to Security
Transmission Owner Interconnection Facilities (TOIF) $7,308,561 $7,308,561
Other Scope $0 $0
Option to Build Oversight $0 $0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades $98,140,632 $98,140,632
Network Upgrades $151,928,890 $151,928,890
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL) $208,177,574 $208,177,574
Transient Stability $35,264,546 $35,264,546
Short Circuit $173,379 $173,379
Transmission Owner Analysis
SubRegional $0 $0
Distribution $0 $0
Affected System Study Reinforcements
AFS - PJM Violatons $0 $0
AFS - Non-PJM Violations $0 $0
Total $500,993,582 $500,993,582

* Contributes to calculation for Security. See Security Section of this report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Security Requirement

Per Tariff Part VII, Subpart D, section 313 (Decision Point III) A.1.a and PJM Manual 14H, section 8.6.1, Project Developers and Eligible Customers are required to provide Security in a form acceptable to PJM at Decision Point III which runs concurrently with the projects' Final Agreement Negotiation Phase. Security may be in the form of cash, letter of credit, or other form of Security acceptable to PJM (see PJM M14H, Section 6.4).

Security is calculated for a New Service Request based on the Network Upgrade costs allocated pursuant to the Phase III System Impact Study results.

Note 1: "Network Upgrades" referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Security Due for AF1-125

Security has been calculated for the AF1-125 project(s) based on the Phase III System Impact Study results and is shown in the table below. This Security must be provided at Decision Point III through either a wire transfer or letter of credit or other form of Security deemed acceptable by PJM per Manual 14H, Section 6.4.

Security Due for AF1-125
Project(s): AF1-125
Final Agreement Security (A): $500,993,582
Portion of Costs Already Paid (B): $239,142,991
Net Security Due at DP3: A B = $261,850,591
Note: Failure to provide an acceptable form of Security by the end of Decision Point III will result in withdrawal and termination of the New Service Request.

Transmission Owner Scope of Work

The New Service Request Project will interconnect with the Dominion transmission system via a new Harpers switching station that connects at Fentress 230/500 kV substation. The required work for the interconnection of the New Service Request Project to the Dominion Transmission System is detailed in the following tables.

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Network Upgrades
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
n8317.1

Expand Fentress 500 kV and 230 kV substations to terminate three new 230 kV lines from Harpers Road substation and connect them to Fentress 500 kV

$32,089,434 $188,729,124 $3,121,660 $2,604,178 $226,544,396 $75,514,799 (See Note 1)
n8317.2

Construct three (3) overhead 230kV transmission lines that will start at the existing Fentress Substation and terminate at the new Harpers Road Substation, located approximately 14.3 miles away

$87,809,759 $122,418,217 $7,002,882 $12,011,417 $229,242,275 $76,414,092 (See Note 1)
Stand-Alone Network Upgrades
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
n8317.3

Build new 230 kV Harpers Road switching station to terminate nine offshore wind export cables for AF1-123/124/125 and consolidate to three overhead 230 kV transmission lines to go to Fentress Substation

$54,931,535 $211,895,213 $9,823,673 $17,771,475 $294,421,896 $98,140,632 (See Note 1)
Transmission Owner Interconnection Facilities
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
(Pending)

Install 230 kV backbone structures and foundations within the fence of the Interconnection Substation, to terminate the Project Developer’s generator lead lines. Line conductor from the backbone structure to the bus position in the switchyard of the interconnection substation.

$497,960 $6,185,453 $105,765 $519,383 $7,308,561 $7,308,561

Based on the scope of work for the Interconnection Facilities, it is expected to take 10 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase 2 of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.

It is estimated to take 10 months to complete this work upon execution of the Generator Interconnection Agreement (GIA).This estimated time to complete is dependent on major equipment lead times. These preliminary cost estimates are based on typical engineering costs. A more detailed engineering cost estimates are normally done when the Project Developer provides an exact site plan location for the generation substation during a future study phase.  As shown in the one line diagram, this Interconnection Request is sharing the Point of Interconnection (POI) and Interconnection Facilities with one or more other Interconnection Requests. Should other requests withdraw from Transition Cycle 1, the cost allocation for Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and applicable Network Upgrades identified in the study report will be updated for the remaining project(s). Refer to the one line for other Interconnection Requests at this POI. 


Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.
 
Remote Terminal Work: During Phase 2 of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Transmission Owner Analysis

PJM performed a power flow analysis of the transmission system using a 2027 load flow model and the results were verified by Dominion.

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. Dominion interconnection requirements can be found here. Refer to AF1-125 Physical Interconnection Facilities Study for additional requirements found in the General Section of the report.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The wind generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Wind speed (meters/second) - (Required)
  • Wind direction (decimal degrees from true north) - (Required)
  • Ambient air temperature (Fahrenheit) - (Required)
  • Air Pressure (Hectopascals) - (Required)
  • Humidity (Percent) (Accepted, not required)
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request was evaluated as a 820.0 MW (249.3 MW Capacity) injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential summer peak period network impacts were as follows:

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
314218 to 314908 ckt 1
DVP_P4-2: H2T557_SRT-S
CONTINGENCY 'DVP_P4-2: H2T557_SRT-S'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Breaker AC 134.11 % 1065.0 C 1428.3 115.96
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P4-2: 562T563_SRT-S
CONTINGENCY 'DVP_P4-2: 562T563_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1                /*8CARSON      500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 314927 CKT 1 /*8SEPTA       500.0 - 8YADKIN      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314923 TO BUS 314927 CKT 1 /*8SEPTA       500.0 - 8YADKIN      500.0
END
Breaker AC 147.68 % 812.0 C 1199.17 44.42
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Breaker AC 105.64 % 3940.0 C 4162.33 236.12
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Breaker AC 107.33 % 3940.0 C 4228.89 226.99
DVP 8CARSON-6CARSON 500.0/230.0 kV Ckt 2 transformer
314902 to 314282 ckt 2
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 118.17 % 1056.8 C 1248.84 53.47
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: 563T576_SRT-S
CONTINGENCY 'DVP_P4-2: 563T576_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 102.26 % 3144.0 C 3215.2 246.18
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 101.94 % 3144.0 C 3205.05 244.47
DVP 6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
DVP_P4-2: 2110T2128_SRT-A
CONTINGENCY 'DVP_P4-2: 2110T2128_SRT-A'
 OPEN BRANCH FROM BUS 314466 TO BUS 314508 CKT 1   /*6FENTRES     230.0 - 6THRASHER    230.0
 OPEN BRANCH FROM BUS 314480 TO BUS 314508 CKT 1   /*6HUNTSMN     230.0 - 6THRASHER    230.0
 OPEN BRANCH FROM BUS 314480 TO BUS 314537 CKT 1   /*6HUNTSMN     230.0 - 6SUFFOLK     230.0
 OPEN BUS 314480                                   /*6HUNTSMN     230.0
END
Breaker AC 122.56 % 830.0 C 1017.27 127.08
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P4-2: 224022-1_SRT-S
CONTINGENCY 'DVP_P4-2: 224022-1_SRT-S'
 OPEN BRANCH FROM BUS 314466 TO BUS 314909 CKT 1                /*6FENTRES     230.0 - 8FENTRES     500.0
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1                /*6FENTRES     230.0 - 6POCATY      230.0
 OPEN BUS 314655                                                /*6FENTR_2     230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
END
Breaker AC 145.63 % 830.0 C 1208.75 221.69
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P4-2: 224022-2_SRT-S
CONTINGENCY 'DVP_P4-2: 224022-2_SRT-S'
 OPEN BRANCH FROM BUS 314466 TO BUS 314909 CKT 2                /*6FENTRES     230.0 - 8FENTRES     500.0
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1                /*6FENTRES     230.0 - 6POCATY      230.0
 OPEN BUS 313889                                                /*6FENTRES_STC 230.0
 OPEN BUS 314654                                                /*6FENTR_1     230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
END
Breaker AC 145.47 % 830.0 C 1207.43 221.48
DVP 6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
DVP_P4-2: 212822_SRT-S
CONTINGENCY 'DVP_P4-2: 212822_SRT-S'
 OPEN BRANCH FROM BUS 314466 TO BUS 314508 CKT 1                /*6FENTRES     230.0 - 6THRASHER    230.0
 OPEN BRANCH FROM BUS 314466 TO BUS 314909 CKT 1                /*6FENTRES     230.0 - 8FENTRES     500.0
 OPEN BUS 314655                                                /*6FENTR_2     230.0
 SET POSTCONTRATING 1166 BRANCH FROM BUS 314480 TO BUS 314508 CKT 1 /*6HUNTSMN     230.0 - 6THRASHER    230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
 SET PRECONTRATING 1051 BRANCH FROM BUS 314480 TO BUS 314508 CKT 1 /*6HUNTSMN     230.0 - 6THRASHER    230.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
END
Breaker AC 120.03 % 830.0 C 996.28 157.11
DVP 6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
DVP_P4-2: 269T2128_SRT-S
CONTINGENCY 'DVP_P4-2: 269T2128_SRT-S'
 OPEN BRANCH FROM BUS 314466 TO BUS 314508 CKT 1                /*6FENTRES     230.0 - 6THRASHER    230.0
 OPEN BRANCH FROM BUS 314466 TO BUS 314645 CKT 1                /*6FENTRES     230.0 - 6SLIGO L269  230.0
 OPEN BRANCH FROM BUS 314645 TO BUS 938530 CKT 1                /*6SLIGO L269  230.0 - AE1-072 TP   230.0
 SET POSTCONTRATING 1166 BRANCH FROM BUS 314480 TO BUS 314508 CKT 1 /*6HUNTSMN     230.0 - 6THRASHER    230.0
 SET PRECONTRATING 1051 BRANCH FROM BUS 314480 TO BUS 314508 CKT 1 /*6HUNTSMN     230.0 - 6THRASHER    230.0
END
Breaker AC 116.73 % 830.0 C 968.83 147.84
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P4-2: H1T567_SRT-A
CONTINGENCY 'DVP_P4-2: H1T567_SRT-A'
 OPEN BRANCH FROM BUS 314214 TO BUS 314903 CKT 1   /*6CHCKAHM     230.0 - 8CHCKAHM     500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Breaker AC 105.01 % 3940.0 C 4137.47 230.98
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P4-2: H2T574_SRT-S_SENS
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S_SENS'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 313483 CKT 1 /*8LADYSMITH   500.0 - 8KRAKEN      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 313483 CKT 1 /*8LADYSMITH   500.0 - 8KRAKEN      500.0
END
Breaker AC 103.76 % 3940.0 C 4088.29 219.82
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: H6T576_SRT-A
CONTINGENCY 'DVP_P4-2: H6T576_SRT-A'
 OPEN BRANCH FROM BUS 314322 TO BUS 314914 CKT 1   /*6MDLTHAN     230.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Breaker AC 102.27 % 3144.0 C 3215.35 246.18
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: H6T563_SRT-S
CONTINGENCY 'DVP_P4-2: H6T563_SRT-S'
 OPEN BRANCH FROM BUS 314322 TO BUS 314914 CKT 1                /*6MDLTHAN     230.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Breaker AC 102.27 % 3144.0 C 3215.35 246.18
DVP 6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 138.18 % 663.64 B 917.03 15.08
DVP 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 105.13 % 1058.16 B 1112.41 18.54
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 271_SRT-A
CONTINGENCY 'DVP_P1-2: LN 271_SRT-A'
 OPEN BRANCH FROM BUS 314481 TO BUS 316171 CKT 1   /*6LANDSTN     230.0 - 6POCATY      230.0
END
Single AC 107.21 % 678.68 B 727.63 62.99
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1-2: LN 574_SRT-S_SENS
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S_SENS'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2598 BRANCH FROM BUS 314908 TO BUS 314903 CKT 1 /*8ELMONT      500.0 - 8CHCKAHM     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314918 TO BUS 314911 CKT 1 /*8NO ANNA     500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2598 BRANCH FROM BUS 314908 TO BUS 314903 CKT 1 /*8ELMONT      500.0 - 8CHCKAHM     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314918 TO BUS 314911 CKT 1 /*8NO ANNA     500.0 - 8LADYSMITH   500.0
END
Single AC 104.61 % 3220.44 B 3368.83 64.91
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 2240_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2240_SRT-A'
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1   /*6FENTRES     230.0 - 6POCATY      230.0
END
Single AC 104.23 % 678.68 B 707.41 63.02
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A
CONTINGENCY 'DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A'
 OPEN BRANCH FROM BUS 314218 TO BUS 314196 CKT 1   /*6ELMONT      230.0 - 6LADYSMITH   230.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1   /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Tower AC 109.61 % 3940.0 C 4318.45 233.91
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A
CONTINGENCY 'DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A'
 OPEN BRANCH FROM BUS 314218 TO BUS 314196 CKT 1   /*6ELMONT      230.0 - 6LADYSMITH   230.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1   /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Tower AC 105.56 % 3940.0 C 4158.88 206.19

Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H2T557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
314218 to 314908 ckt 1
Contingency Name:
DVP_P4-2: H2T557_SRT-S
CONTINGENCY 'DVP_P4-2: H2T557_SRT-S'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 134.11 %
Rating: 1065.0 MVA
Rating Type: C
MVA to Mitigate: 1428.3 MVA
MW Contribution: 115.96 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
314218 to 314908 ckt 1
Contingency Name:
DVP_P4-2: H2T557_SRT-S
CONTINGENCY 'DVP_P4-2: H2T557_SRT-S'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 168.67 %
Rating: 1065.0 MVA
Rating Type: C
MVA to Mitigate: 1796.38 MVA
MW Contribution: 134.79 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.36 MW 0.3 MW
961942 AG1-037 E Adder 0.24 MW 0.2 MW
962331 AG1-082 C Adder 1.43 MW 1.22 MW
962332 AG1-082 E Adder 0.95 MW 0.81 MW
965291 AG1-394 C Adder 0.62 MW 0.53 MW
965292 AG1-394 E Adder 1.14 MW 0.97 MW
966621 AG1-532 C Adder 0.95 MW 0.81 MW
966622 AG1-532 E Adder 0.63 MW 0.54 MW
314541 3WATKINS Adder 0.52 MW 0.44 MW
314572 3EMPORIA Adder 0.29 MW 0.25 MW
918492 AA1-063AE OP Adder 2.83 MW 2.41 MW
920042 AA2-088 E OP Adder 7.72 MW 6.56 MW
934521 AD1-076 C Adder 8.86 MW 7.53 MW
934522 AD1-076 E Adder 4.51 MW 3.84 MW
943172 AE2-346 E Adder 0.43 MW 0.36 MW
960081 AF2-299 C Adder 1.27 MW 1.08 MW
960082 AF2-299 E Adder 0.84 MW 0.72 MW
316141 AB2-099 E Adder 0.18 MW 0.15 MW
900672 V4-068 E Adder 0.26 MW 0.22 MW
940492 AE2-034 E Adder 2.28 MW 1.94 MW
946281 AF1-292 C Adder 1.05 MW 0.89 MW
946282 AF1-292 E Adder 0.7 MW 0.59 MW
957521 AF2-046 C Adder 10.16 MW 8.64 MW
957522 AF2-046 E Adder 5.14 MW 4.37 MW
314539 3UNCAMP Adder 4.63 MW 3.94 MW
916042 Z1-036 E Adder 21.64 MW 18.4 MW
938771 AE1-103 C Adder 2.25 MW 1.91 MW
938772 AE1-103 E Adder 3.11 MW 2.64 MW
314229 6MT RD221 50/50 0.18 MW 0.18 MW
314236 6NRTHEST 50/50 0.24 MW 0.24 MW
314331 6POE Adder 1.25 MW 1.06 MW
314507 3THOMPSN Adder 1.62 MW 1.38 MW
314525 6KINGFORK Adder 0.83 MW 0.71 MW
314550 6HICKORY Adder 1.72 MW 1.46 MW
315050 1FOURRIVERG 50/50 6.28 MW 6.28 MW
315060 1CHESTF5 Adder 70.53 MW 59.95 MW
315065 1CHESTF6 Adder 21.43 MW 18.22 MW
315067 1DARBY 1 50/50 3.25 MW 3.25 MW
315068 1DARBY 2 50/50 3.26 MW 3.26 MW
315069 1DARBY 3 50/50 3.27 MW 3.27 MW
315070 1DARBY 4 50/50 3.27 MW 3.27 MW
315073 1STONECA Adder 7.28 MW 6.19 MW
315083 1SPRUNCA Adder 10.11 MW 8.6 MW
315084 1SPRUNCB Adder 10.11 MW 8.6 MW
315092 1YORKTN3 Adder 118.93 MW 101.09 MW
925865 AC1-065 E Adder 16.6 MW 14.11 MW
926412 AC1-112 E 50/50 1.51 MW 1.51 MW
926472 AC1-118 E Adder 0.95 MW 0.81 MW
926662 AC1-147 E Adder 1.06 MW 0.9 MW
926755 AC1-161 E Adder 10.1 MW 8.59 MW
927226 AC1-216 E Adder 7.54 MW 6.41 MW
934392 AD1-063 E Adder 1.07 MW 0.91 MW
934781 AD1-105 C 50/50 1.55 MW 1.55 MW
934782 AD1-105 E 50/50 6.42 MW 6.42 MW
935112 AD1-144 E Adder 0.77 MW 0.66 MW
936582 AD2-073 E Adder 0.99 MW 0.84 MW
936591 AD2-074 C Adder 5.36 MW 4.55 MW
936592 AD2-074 E Adder 8.74 MW 7.43 MW
942341 AE2-247 C Adder 1.25 MW 1.06 MW
942342 AE2-247 E Adder 1.73 MW 1.47 MW
943461 AF1-017 C Adder 1.13 MW 0.96 MW
943462 AF1-017 E Adder 1.84 MW 1.57 MW
943612 AF1-032 E Adder 0.73 MW 0.62 MW
943741 AF1-042 C Adder 2.8 MW 2.38 MW
943742 AF1-042 E Adder 4.57 MW 3.89 MW
944491 AF1-114 C Adder 4.88 MW 4.14 MW
944492 AF1-114 E Adder 6.73 MW 5.72 MW
961951 AG1-038 C Adder 3.1 MW 2.63 MW
961952 AG1-038 E Adder 4.28 MW 3.64 MW
966661 AG1-536 C Adder 5.15 MW 4.38 MW
966662 AG1-536 E Adder 6.93 MW 5.89 MW
966871 AG1-558 C 50/50 3.55 MW 3.55 MW
966872 AG1-558 E 50/50 1.79 MW 1.79 MW
966881 AG1-559 C Adder 2.03 MW 1.73 MW
966882 AG1-559 E Adder 1.02 MW 0.87 MW
315260 1GOSPORTA Adder 1.71 MW 1.45 MW
315261 1GOSPORTB Adder 2.18 MW 1.86 MW
315262 1GOSPORTC Adder 1.85 MW 1.58 MW
316076 AC2-137 E Adder 1.54 MW 1.31 MW
316078 AC2-138 E Adder 0.89 MW 0.76 MW
316157 AD2-030 E Adder 1.16 MW 0.99 MW
913392 Y1-086 E Adder 1.71 MW 1.46 MW
916192 Z1-068 E Adder 1.5 MW 1.27 MW
923832 AB2-022 E Adder 0.97 MW 0.82 MW
923842 AB2-024 E Adder 1.81 MW 1.54 MW
923852 AB2-025 E Adder 0.86 MW 0.73 MW
930122 AB1-027 E 50/50 1.86 MW 1.86 MW
938552 AE1-074 E Adder 1.21 MW 1.03 MW
939312 AE1-162 E Adder 1.24 MW 1.06 MW
946262 AF1-291 E Adder 1.54 MW 1.31 MW
957411 AF2-035 C Adder 7.34 MW 6.24 MW
957412 AF2-035 E Adder 3.67 MW 3.12 MW
957492 AF2-043 E Adder 1.13 MW 0.96 MW
957601 AF2-054 C Adder 2.07 MW 1.76 MW
957602 AF2-054 E Adder 1.38 MW 1.17 MW
962861 AG1-135 C Adder 5.82 MW 4.95 MW
962862 AG1-135 E Adder 3.88 MW 3.3 MW
962962 AG1-145 E Adder 1.39 MW 1.18 MW
962971 AG1-146 C Adder 2.98 MW 2.53 MW
962972 AG1-146 E Adder 1.99 MW 1.69 MW
962981 AG1-147 C Adder 6.95 MW 5.91 MW
962982 AG1-147 E Adder 4.64 MW 3.94 MW
963611 AG1-210 C Adder 0.64 MW 0.54 MW
963612 AG1-210 E Adder 0.96 MW 0.81 MW
964211 AG1-282 C Adder 1.95 MW 1.66 MW
964212 AG1-282 E Adder 1.3 MW 1.1 MW
901082 W1-029 E Adder 24.7 MW 21.0 MW
917122 Z2-027 E Adder 1.04 MW 0.89 MW
925332 AB2-190 E Adder 8.13 MW 6.91 MW
925522 AC1-027 E Adder 0.97 MW 0.82 MW
942001 AE2-212 C Adder 2.19 MW 1.86 MW
942002 AE2-212 E Adder 1.46 MW 1.24 MW
957832 AF2-077 E Adder 1.33 MW 1.13 MW
957871 AF2-081 C Adder 7.85 MW 6.67 MW
957872 AF2-081 E Adder 3.36 MW 2.86 MW
957971 AF2-091 C Adder 1.66 MW 1.41 MW
957972 AF2-091 E Adder 2.29 MW 1.95 MW
958161 AF2-110 C Adder 1.1 MW 0.93 MW
958162 AF2-110 E Adder 1.74 MW 1.48 MW
313811 6ELKO L286 Adder 1.61 MW 1.37 MW
314181 3NORNECK Adder 0.85 MW 0.72 MW
933291 AC2-141 C Adder 23.67 MW 20.12 MW
933292 AC2-141 E Adder 10.1 MW 8.59 MW
939411 AE1-173 C Adder 60.71 MW 51.6 MW
939412 AE1-173 E Adder 40.47 MW 34.4 MW
934012 AD1-025 E Adder 9.76 MW 8.29 MW
927041 AC1-191 C 50/50 14.26 MW 14.26 MW
927042 AC1-191 E 50/50 7.11 MW 7.11 MW
933981 AD1-022 C Adder 6.3 MW 5.35 MW
933982 AD1-022 E Adder 3.43 MW 2.92 MW
961681 AG1-008 C Adder 10.16 MW 8.64 MW
961682 AG1-008 E Adder 5.14 MW 4.37 MW
313053 6PAPERMILL Adder 6.68 MW 5.68 MW
314594 6PLYMOUTH TP Adder 0.23 MW 0.2 MW
314632 6AYDLETT TAP Adder 1.06 MW 0.9 MW
316004 AC1-112 C 50/50 0.44 MW 0.44 MW
316160 AE1-175 E Adder 1.14 MW 0.97 MW
316169 AC1-164 GEN Adder 43.81 MW 37.24 MW
316233 AE1-074 C Adder 2.4 MW 2.04 MW
316240 AF1-291 C Adder 2.32 MW 1.97 MW
316312 AB1-027 C 50/50 0.71 MW 0.71 MW
917332 KELFORD E Adder 1.16 MW 0.99 MW
924516 AB2-100 E1 Adder 2.03 MW 1.73 MW
924517 AB2-100 E2 Adder 2.03 MW 1.73 MW
926206 AC1-098 E Adder 1.88 MW 1.6 MW
926785 AC1-164_E Adder 19.68 MW 16.73 MW
934065 AD1-033 E Adder 3.96 MW 3.37 MW
937226 AE2-253 E Adder 4.59 MW 3.9 MW
939612 AE1-191 E Adder 5.63 MW 4.78 MW
315051 AA1-145 CT1 50/50 6.56 MW 6.56 MW
315052 AA1-145 CT2 50/50 6.56 MW 6.56 MW
939246 AE1-155 E Adder 8.34 MW 7.09 MW
918512 AA1-065 E OP Adder 3.9 MW 3.32 MW
919153 AA1-139 E2 Adder 3.21 MW 2.73 MW
919152 AA1-139 E1 Adder 3.21 MW 2.73 MW
920692 AA2-178 E Adder 3.04 MW 2.58 MW
924814 AB2-134 E Adder 12.34 MW 10.49 MW
316084 AB2-161 E Adder 4.94 MW 4.2 MW
316088 AB2-174 E Adder 4.41 MW 3.75 MW
932046 AC2-012 E Adder 10.52 MW 8.94 MW
316311 AC2-079 C Adder 4.78 MW 4.06 MW
932596 AC2-079 E Adder 7.8 MW 6.63 MW
934146 AD1-041 E Adder 3.52 MW 2.99 MW
934576 AD1-082 E Adder 3.94 MW 3.35 MW
316349 AD2-085 C Adder 2.88 MW 2.45 MW
936666 AD2-085 E Adder 4.7 MW 4.0 MW
961611 AG1-000B C Adder 14.77 MW 12.55 MW
941591 AE2-156 C Adder 14.37 MW 12.21 MW
944581 AF1-123 C Adder 35.81 MW 30.43 MW
944582 AF1-123 E Adder 81.99 MW 69.69 MW
944591 AF1-124 C Adder 35.93 MW 30.54 MW
944592 AF1-124 E Adder 82.29 MW 69.95 MW
944601 AF1-125 C Adder 35.26 MW 29.97 MW
944602 AF1-125 E Adder 80.71 MW 68.6 MW
944631 AF1-128 C Adder 44.13 MW 37.51 MW
958261 AF2-120 C Adder 5.99 MW 5.09 MW
958262 AF2-120 E Adder 3.99 MW 3.4 MW
965281 AG1-393 C Adder 2.22 MW 1.89 MW
965282 AG1-393 E Adder 1.48 MW 1.26 MW
934501 AD1-074 C Adder 24.38 MW 20.73 MW
934502 AD1-074 E Adder 12.41 MW 10.55 MW
934511 AD1-075 C Adder 6.1 MW 5.18 MW
934512 AD1-075 E Adder 3.1 MW 2.64 MW
935161 AD1-151 C Adder 16.02 MW 13.61 MW
935162 AD1-151 E Adder 10.68 MW 9.08 MW
938531 AE1-072 C Adder 13.78 MW 11.71 MW
938532 AE1-072 E Adder 7.18 MW 6.11 MW
939191 AE1-149 C Adder 10.01 MW 8.51 MW
939192 AE1-149 E Adder 6.67 MW 5.67 MW
939261 AE1-157 C Adder 9.71 MW 8.26 MW
939262 AE1-157 E Adder 5.27 MW 4.48 MW
939602 AE1-190 E Adder 1.41 MW 1.2 MW
940431 AE2-027 C Adder 13.54 MW 11.51 MW
940432 AE2-027 E Adder 9.03 MW 7.67 MW
940481 AE2-033 C Adder 11.92 MW 10.13 MW
940482 AE2-033 E Adder 8.03 MW 6.83 MW
940541 AE2-040 C Adder 2.13 MW 1.81 MW
940551 AE2-041 C Adder 7.13 MW 6.06 MW
940641 AE2-051 C Adder 10.94 MW 9.3 MW
940642 AE2-051 E Adder 7.29 MW 6.2 MW
941101 AE2-104 C Adder 2.68 MW 2.28 MW
941102 AE2-104 E Adder 4.27 MW 3.63 MW
943471 AF1-018 C Adder 7.13 MW 6.06 MW
944641 AF1-129 C Adder 111.79 MW 95.02 MW
315043 1FOUR RIVERA 50/50 4.12 MW 4.12 MW
315044 1FOUR RIVERB 50/50 4.12 MW 4.12 MW
315045 1FOUR RIVERC 50/50 5.03 MW 5.03 MW
315046 1FOUR RIVERD 50/50 4.06 MW 4.06 MW
315047 1FOUR RIVERE 50/50 4.06 MW 4.06 MW
315048 1FOUR RIVERF 50/50 4.96 MW 4.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 4.44 MW 4.44 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 41.67 MW 41.67 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.59 MW 1.59 MW
NY PJM->LTFIMP_NY CLTF 0.81 MW 0.81 MW
CPLE LTFEXP_CPLE->PJM CLTF 5.58 MW 5.58 MW
TVA LTFEXP_TVA->PJM CLTF 1.58 MW 1.58 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.05 MW 0.05 MW
MEC LTFEXP_MEC->PJM CLTF 0.3 MW 0.3 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.13 MW 0.13 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.09 MW 2.09 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 10.18 MW 10.18 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.65 MW 2.65 MW

Details for 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P4-2: 562T563_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
Contingency Name:
DVP_P4-2: 562T563_SRT-S
CONTINGENCY 'DVP_P4-2: 562T563_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1                /*8CARSON      500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 314927 CKT 1 /*8SEPTA       500.0 - 8YADKIN      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314923 TO BUS 314927 CKT 1 /*8SEPTA       500.0 - 8YADKIN      500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 147.68 %
Rating: 812.0 MVA
Rating Type: C
MVA to Mitigate: 1199.17 MVA
MW Contribution: 44.42 MW
Impact of Topology Modeling:
Increase
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.36 MW 0.31 MW
961672 AG1-007 E Adder 0.2 MW 0.17 MW
961941 AG1-037 C Adder 0.2 MW 0.17 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.8 MW 0.68 MW
962332 AG1-082 E Adder 0.53 MW 0.45 MW
963041 AG1-153 C Adder 2.36 MW 2.0 MW
963042 AG1-153 E Adder 3.54 MW 3.01 MW
964791 AG1-342 C Adder 1.17 MW 0.99 MW
964792 AG1-342 E Adder 0.78 MW 0.66 MW
966801 AG1-551 C Adder 0.79 MW 0.67 MW
966802 AG1-551 E Adder 0.41 MW 0.35 MW
966811 AG1-552 C Adder 0.89 MW 0.76 MW
966812 AG1-552 E Adder 0.42 MW 0.36 MW
965291 AG1-394 C Adder 0.35 MW 0.29 MW
965292 AG1-394 E Adder 0.64 MW 0.54 MW
966621 AG1-532 C Adder 0.68 MW 0.58 MW
966622 AG1-532 E Adder 0.45 MW 0.39 MW
314541 3WATKINS Adder 0.27 MW 0.23 MW
314572 3EMPORIA Adder 0.21 MW 0.18 MW
315131 1EDGECMA Adder 6.01 MW 5.11 MW
918492 AA1-063AE OP Adder 1.72 MW 1.47 MW
918532 AA1-067 E Adder 0.27 MW 0.23 MW
919692 AA2-053 E OP Adder 1.8 MW 1.53 MW
920042 AA2-088 E OP Adder 4.28 MW 3.63 MW
925785 AC1-054 E Adder 1.34 MW 1.14 MW
926274 AC1-105 E Adder 0.88 MW 0.74 MW
927146 AC1-208 E Adder 1.75 MW 1.48 MW
934521 AD1-076 C Adder 4.44 MW 3.77 MW
934522 AD1-076 E Adder 2.26 MW 1.92 MW
943172 AE2-346 E Adder 0.24 MW 0.2 MW
944011 AF1-069 C Adder 5.55 MW 4.72 MW
944012 AF1-069 E Adder 2.16 MW 1.83 MW
960081 AF2-299 C Adder 0.91 MW 0.77 MW
960082 AF2-299 E Adder 0.61 MW 0.52 MW
316141 AB2-099 E Adder 0.1 MW 0.09 MW
900672 V4-068 E Adder 0.14 MW 0.12 MW
917342 Z2-044 E Adder 0.27 MW 0.23 MW
922923 AB1-081 E OP Adder 1.44 MW 1.23 MW
923263 AB1-132 E OP Adder 2.84 MW 2.41 MW
923573 AB1-173 E OP Adder 1.52 MW 1.29 MW
924162 AB2-060 E OP Adder 1.45 MW 1.23 MW
924302 AB2-077 E O1 Adder 0.46 MW 0.39 MW
924312 AB2-078 E O1 Adder 0.46 MW 0.39 MW
924322 AB2-079 E O1 Adder 0.46 MW 0.39 MW
939181 AE1-148 C Adder 3.19 MW 2.71 MW
939182 AE1-148 E Adder 2.13 MW 1.81 MW
940492 AE2-034 E Adder 1.09 MW 0.92 MW
941031 AE2-094 C Adder 16.98 MW 14.43 MW
941032 AE2-094 E Adder 7.6 MW 6.46 MW
946281 AF1-292 C Adder 0.75 MW 0.64 MW
946282 AF1-292 E Adder 0.5 MW 0.43 MW
957481 AF2-042 C Adder 19.92 MW 16.93 MW
957482 AF2-042 E Adder 13.28 MW 11.29 MW
957521 AF2-046 C Adder 5.67 MW 4.82 MW
957522 AF2-046 E Adder 2.87 MW 2.44 MW
957861 AF2-080 C Adder 2.9 MW 2.47 MW
957862 AF2-080 E Adder 1.29 MW 1.09 MW
314539 3UNCAMP Adder 2.36 MW 2.01 MW
916042 Z1-036 E Adder 9.71 MW 8.26 MW
938771 AE1-103 C Adder 1.13 MW 0.96 MW
938772 AE1-103 E Adder 1.56 MW 1.32 MW
314331 6POE 50/50 1.23 MW 1.23 MW
314507 3THOMPSN Adder 0.64 MW 0.54 MW
314525 6KINGFORK Adder 0.34 MW 0.29 MW
314550 6HICKORY Adder 0.66 MW 0.56 MW
315065 1CHESTF6 50/50 26.43 MW 26.43 MW
315073 1STONECA 50/50 4.75 MW 4.75 MW
315076 1HOPPOLC 50/50 1.05 MW 1.05 MW
315077 1HOPHCF1 50/50 1.68 MW 1.68 MW
315078 1HOPHCF2 50/50 1.68 MW 1.68 MW
315079 1HOPHCF3 50/50 1.68 MW 1.68 MW
315080 1HOPHCF4 50/50 2.54 MW 2.54 MW
926662 AC1-147 E Adder 0.42 MW 0.35 MW
927226 AC1-216 E Adder 4.19 MW 3.56 MW
935112 AD1-144 E Adder 0.31 MW 0.27 MW
942341 AE2-247 C Adder 0.7 MW 0.59 MW
942342 AE2-247 E Adder 0.96 MW 0.82 MW
943461 AF1-017 C Adder 0.63 MW 0.54 MW
943462 AF1-017 E Adder 1.03 MW 0.87 MW
943612 AF1-032 E Adder 0.3 MW 0.26 MW
315260 1GOSPORTA Adder 0.67 MW 0.57 MW
315261 1GOSPORTB Adder 0.86 MW 0.73 MW
315262 1GOSPORTC Adder 0.73 MW 0.62 MW
316132 AB2-190 C 50/50 2.49 MW 2.49 MW
913392 Y1-086 E Adder 0.7 MW 0.59 MW
916192 Z1-068 E Adder 0.58 MW 0.49 MW
923832 AB2-022 E Adder 0.4 MW 0.34 MW
923852 AB2-025 E 50/50 0.71 MW 0.71 MW
939312 AE1-162 E Adder 0.55 MW 0.46 MW
946262 AF1-291 E 50/50 1.87 MW 1.87 MW
957492 AF2-043 E Adder 0.47 MW 0.4 MW
901082 W1-029 E Adder 10.5 MW 8.92 MW
917122 Z2-027 E Adder 0.43 MW 0.37 MW
925332 AB2-190 E 50/50 4.84 MW 4.84 MW
925522 AC1-027 E Adder 0.38 MW 0.32 MW
942001 AE2-212 C 50/50 2.38 MW 2.38 MW
942002 AE2-212 E 50/50 1.59 MW 1.59 MW
957871 AF2-081 C Adder 3.08 MW 2.62 MW
957872 AF2-081 E Adder 1.32 MW 1.12 MW
958161 AF2-110 C Adder 0.51 MW 0.43 MW
958162 AF2-110 E Adder 0.81 MW 0.69 MW
917512 Z2-088 E OP1 Adder 1.87 MW 1.59 MW
926071 AC1-086 C Adder 9.75 MW 8.29 MW
926072 AC1-086 E Adder 4.44 MW 3.77 MW
927021 AC1-189 C Adder 3.2 MW 2.72 MW
927022 AC1-189 E Adder 1.59 MW 1.35 MW
934621 AD1-088 C Adder 4.3 MW 3.66 MW
934622 AD1-088 E Adder 2.02 MW 1.72 MW
939411 AE1-173 C Adder 34.69 MW 29.49 MW
939412 AE1-173 E Adder 23.13 MW 19.66 MW
934012 AD1-025 E Adder 5.43 MW 4.61 MW
933981 AD1-022 C Adder 3.23 MW 2.74 MW
933982 AD1-022 E Adder 1.76 MW 1.49 MW
962572 AG1-106 E Adder 0.55 MW 0.47 MW
961681 AG1-008 C Adder 5.67 MW 4.82 MW
961682 AG1-008 E Adder 2.87 MW 2.44 MW
962571 AG1-106 C Adder 1.26 MW 1.07 MW
314594 6PLYMOUTH TP Adder 0.12 MW 0.1 MW
314632 6AYDLETT TAP Adder 0.42 MW 0.36 MW
316240 AF1-291 C 50/50 2.8 MW 2.8 MW
316263 AC1-034 C Adder 2.57 MW 2.18 MW
316274 AC1-208 C Adder 3.93 MW 3.34 MW
316315 AB2-025 C 50/50 0.25 MW 0.25 MW
917332 KELFORD E Adder 0.67 MW 0.57 MW
924516 AB2-100 E1 Adder 1.53 MW 1.3 MW
924517 AB2-100 E2 Adder 1.53 MW 1.3 MW
925595 AC1-034 E Adder 1.94 MW 1.65 MW
926206 AC1-098 E Adder 1.57 MW 1.33 MW
926214 AC1-099 E Adder 0.52 MW 0.44 MW
934065 AD1-033 E Adder 1.52 MW 1.29 MW
937226 AE2-253 E Adder 1.79 MW 1.52 MW
918512 AA1-065 E OP Adder 2.13 MW 1.81 MW
919153 AA1-139 E2 Adder 1.26 MW 1.07 MW
919152 AA1-139 E1 Adder 1.26 MW 1.07 MW
919710 AA2-057 E Adder 1.76 MW 1.5 MW
920692 AA2-178 E Adder 1.45 MW 1.23 MW
923994 AB2-040_E Adder 2.84 MW 2.42 MW
924022 AB2-043 E O1 Adder 1.77 MW 1.5 MW
924152 AB2-059 E OP Adder 2.04 MW 1.74 MW
924814 AB2-134 E Adder 6.87 MW 5.84 MW
316083 AB2-161 C 50/50 0.34 MW 0.34 MW
316084 AB2-161 E 50/50 3.38 MW 3.38 MW
925122 AB2-169 E Adder 2.12 MW 1.8 MW
316088 AB2-174 E Adder 3.06 MW 2.6 MW
932046 AC2-012 E Adder 4.12 MW 3.5 MW
316311 AC2-079 C Adder 2.6 MW 2.21 MW
932596 AC2-079 E Adder 4.25 MW 3.61 MW
316381 AD1-082 C 50/50 0.77 MW 0.77 MW
934576 AD1-082 E 50/50 2.7 MW 2.7 MW
316349 AD2-085 C Adder 1.6 MW 1.36 MW
936666 AD2-085 E Adder 2.62 MW 2.22 MW
961611 AG1-000B C Adder 7.24 MW 6.16 MW
941591 AE2-156 C Adder 5.62 MW 4.78 MW
944581 AF1-123 C Adder 13.72 MW 11.66 MW
944582 AF1-123 E Adder 31.41 MW 26.7 MW
944591 AF1-124 C Adder 13.77 MW 11.7 MW
944592 AF1-124 E Adder 31.52 MW 26.8 MW
944601 AF1-125 C Adder 13.51 MW 11.48 MW
944602 AF1-125 E Adder 30.92 MW 26.28 MW
962491 AG1-098 C Adder 3.8 MW 3.23 MW
962492 AG1-098 E Adder 2.53 MW 2.15 MW
962561 AG1-105 C Adder 2.95 MW 2.51 MW
962562 AG1-105 E Adder 1.97 MW 1.67 MW
964241 AG1-285 C Adder 4.28 MW 3.64 MW
964242 AG1-285 E Adder 2.86 MW 2.43 MW
965281 AG1-393 C Adder 1.08 MW 0.92 MW
965282 AG1-393 E Adder 0.72 MW 0.61 MW
313764 3SOCKMAN Adder 0.32 MW 0.27 MW
932632 AC2-084 E Adder 1.38 MW 1.18 MW
934321 AD1-056 C Adder 2.63 MW 2.23 MW
934322 AD1-056 E Adder 1.43 MW 1.21 MW
934331 AD1-057 C Adder 1.47 MW 1.25 MW
934332 AD1-057 E Adder 0.76 MW 0.65 MW
934501 AD1-074 C Adder 12.21 MW 10.38 MW
934502 AD1-074 E Adder 6.22 MW 5.29 MW
934511 AD1-075 C Adder 3.05 MW 2.6 MW
934512 AD1-075 E Adder 1.55 MW 1.32 MW
934612 AD1-087 E Adder 1.29 MW 1.1 MW
935161 AD1-151 C 50/50 9.25 MW 9.25 MW
935162 AD1-151 E 50/50 6.17 MW 6.17 MW
935172 AD1-152 E Adder 1.9 MW 1.62 MW
937482 AD2-202 E Adder 0.38 MW 0.32 MW
938531 AE1-072 C Adder 5.45 MW 4.63 MW
938532 AE1-072 E Adder 2.84 MW 2.42 MW
939191 AE1-149 C 50/50 7.65 MW 7.65 MW
939192 AE1-149 E 50/50 5.1 MW 5.1 MW
940431 AE2-027 C Adder 5.5 MW 4.67 MW
940432 AE2-027 E Adder 3.66 MW 3.11 MW
940481 AE2-033 C 50/50 9.77 MW 9.77 MW
940482 AE2-033 E 50/50 6.59 MW 6.59 MW
940541 AE2-040 C 50/50 1.77 MW 1.77 MW
941101 AE2-104 C Adder 1.24 MW 1.06 MW
941102 AE2-104 E Adder 1.97 MW 1.68 MW
944641 AF1-129 C 50/50 137.81 MW 137.81 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 8.15 MW 8.15 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.56 MW 6.56 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 32.14 MW 32.14 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.99 MW 0.99 MW
NY PJM->LTFIMP_NY CLTF 0.47 MW 0.47 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.32 MW 0.32 MW
WEC LTFEXP_WEC->PJM CLTF 0.17 MW 0.17 MW
CPLE LTFEXP_CPLE->PJM CLTF 4.01 MW 4.01 MW
TVA LTFEXP_TVA->PJM CLTF 1.82 MW 1.82 MW
MEC LTFEXP_MEC->PJM CLTF 1.09 MW 1.09 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.34 MW 2.34 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.32 MW 6.32 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.91 MW 1.91 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P4-2: 557T574_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Contingency Name:
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 105.64 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4162.33 MVA
MW Contribution: 236.12 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Contingency Name:
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 120.37 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4742.51 MVA
MW Contribution: 243.09 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.78 MW 0.66 MW
961942 AG1-037 E Adder 0.52 MW 0.44 MW
962331 AG1-082 C Adder 3.1 MW 2.63 MW
962332 AG1-082 E Adder 2.07 MW 1.76 MW
963041 AG1-153 C 50/50 9.21 MW 9.21 MW
963042 AG1-153 E 50/50 13.82 MW 13.82 MW
966811 AG1-552 C Adder 3.12 MW 2.65 MW
966812 AG1-552 E Adder 1.48 MW 1.26 MW
965291 AG1-394 C Adder 1.32 MW 1.12 MW
965292 AG1-394 E Adder 2.43 MW 2.06 MW
966621 AG1-532 C Adder 2.13 MW 1.81 MW
966622 AG1-532 E Adder 1.42 MW 1.21 MW
314541 3WATKINS Adder 1.08 MW 0.92 MW
314572 3EMPORIA Adder 0.65 MW 0.56 MW
918492 AA1-063AE OP Adder 6.25 MW 5.31 MW
919692 AA2-053 E OP Adder 6.43 MW 5.47 MW
920042 AA2-088 E OP Adder 16.41 MW 13.95 MW
927146 AC1-208 E Adder 6.31 MW 5.36 MW
934521 AD1-076 C Adder 18.89 MW 16.05 MW
934522 AD1-076 E Adder 9.63 MW 8.18 MW
943172 AE2-346 E Adder 0.93 MW 0.79 MW
944011 AF1-069 C 50/50 21.56 MW 21.56 MW
944012 AF1-069 E 50/50 8.38 MW 8.38 MW
960081 AF2-299 C Adder 2.84 MW 2.41 MW
960082 AF2-299 E Adder 1.89 MW 1.61 MW
316141 AB2-099 E Adder 0.39 MW 0.33 MW
900672 V4-068 E Adder 0.55 MW 0.47 MW
917342 Z2-044 E Adder 0.97 MW 0.83 MW
923263 AB1-132 E OP Adder 9.18 MW 7.81 MW
923573 AB1-173 E OP Adder 4.98 MW 4.24 MW
940492 AE2-034 E Adder 4.8 MW 4.08 MW
941031 AE2-094 C 50/50 66.0 MW 66.0 MW
941032 AE2-094 E 50/50 29.56 MW 29.56 MW
946281 AF1-292 C Adder 2.35 MW 2.0 MW
946282 AF1-292 E Adder 1.57 MW 1.33 MW
957481 AF2-042 C Adder 83.41 MW 70.9 MW
957482 AF2-042 E Adder 55.61 MW 47.27 MW
957521 AF2-046 C Adder 21.85 MW 18.57 MW
957522 AF2-046 E Adder 11.04 MW 9.39 MW
314539 3UNCAMP Adder 9.51 MW 8.08 MW
916042 Z1-036 E Adder 44.91 MW 38.17 MW
938771 AE1-103 C Adder 4.59 MW 3.9 MW
938772 AE1-103 E Adder 6.34 MW 5.38 MW
314331 6POE Adder 2.06 MW 1.75 MW
314507 3THOMPSN Adder 3.23 MW 2.74 MW
314525 6KINGFORK Adder 1.59 MW 1.35 MW
314550 6HICKORY 50/50 3.5 MW 3.5 MW
315083 1SPRUNCA Adder 12.63 MW 10.73 MW
315084 1SPRUNCB Adder 12.63 MW 10.73 MW
315092 1YORKTN3 Adder 195.03 MW 165.77 MW
926662 AC1-147 E Adder 2.12 MW 1.8 MW
926755 AC1-161 E 50/50 21.07 MW 21.07 MW
927226 AC1-216 E Adder 11.16 MW 9.49 MW
935112 AD1-144 E Adder 1.48 MW 1.26 MW
942341 AE2-247 C Adder 2.32 MW 1.98 MW
942342 AE2-247 E Adder 3.21 MW 2.73 MW
943461 AF1-017 C Adder 2.1 MW 1.79 MW
943462 AF1-017 E Adder 3.43 MW 2.92 MW
943612 AF1-032 E Adder 1.47 MW 1.25 MW
958502 AF2-144 E Adder 1.76 MW 1.5 MW
315102 1BRUNSWICKG1 50/50 13.6 MW 13.6 MW
315103 1BRUNSWICKG2 50/50 13.6 MW 13.6 MW
315104 1BRUNSWICKG3 50/50 13.6 MW 13.6 MW
315105 1BRUNSWICKS1 50/50 28.26 MW 28.26 MW
315108 1ELIZAR1 50/50 5.12 MW 5.12 MW
315109 1ELIZAR2 50/50 5.03 MW 5.03 MW
315110 1ELIZAR3 50/50 5.19 MW 5.19 MW
315241 1Z1-086 GT1 50/50 17.4 MW 17.4 MW
315242 1Z1-086 GT2 50/50 17.39 MW 17.39 MW
315243 1Z1-086 GT3 50/50 17.39 MW 17.39 MW
315244 1Z1-086 ST 50/50 30.29 MW 30.29 MW
315260 1GOSPORTA Adder 3.4 MW 2.89 MW
315261 1GOSPORTB Adder 4.35 MW 3.7 MW
315262 1GOSPORTC Adder 3.69 MW 3.14 MW
913392 Y1-086 E Adder 3.5 MW 2.98 MW
916192 Z1-068 E 50/50 3.01 MW 3.01 MW
923832 AB2-022 E Adder 1.98 MW 1.68 MW
923852 AB2-025 E Adder 1.8 MW 1.53 MW
923862 AB2-026 E Adder 1.79 MW 1.52 MW
938552 AE1-074 E 50/50 1.93 MW 1.93 MW
938562 AE1-075 E Adder 1.53 MW 1.3 MW
939312 AE1-162 E Adder 2.2 MW 1.87 MW
957492 AF2-043 E Adder 2.26 MW 1.92 MW
962962 AG1-145 E Adder 2.02 MW 1.72 MW
901082 W1-029 E Adder 50.5 MW 42.93 MW
917122 Z2-027 E Adder 2.14 MW 1.81 MW
925332 AB2-190 E Adder 11.46 MW 9.74 MW
925522 AC1-027 E 50/50 1.95 MW 1.95 MW
942001 AE2-212 C Adder 3.11 MW 2.64 MW
942002 AE2-212 E Adder 2.07 MW 1.76 MW
957871 AF2-081 C Adder 16.0 MW 13.6 MW
957872 AF2-081 E Adder 6.86 MW 5.83 MW
958161 AF2-110 C Adder 2.16 MW 1.84 MW
958162 AF2-110 E Adder 3.44 MW 2.92 MW
926071 AC1-086 C Adder 31.56 MW 26.82 MW
926072 AC1-086 E Adder 14.36 MW 12.21 MW
933291 AC2-141 C 50/50 49.36 MW 49.36 MW
933292 AC2-141 E 50/50 21.07 MW 21.07 MW
934621 AD1-088 C Adder 19.05 MW 16.19 MW
934622 AD1-088 E Adder 8.96 MW 7.62 MW
939411 AE1-173 C 50/50 150.51 MW 150.51 MW
939412 AE1-173 E 50/50 100.34 MW 100.34 MW
934012 AD1-025 E Adder 14.46 MW 12.29 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 13.49 MW 11.46 MW
933982 AD1-022 E Adder 7.34 MW 6.24 MW
962572 AG1-106 E Adder 1.79 MW 1.52 MW
961681 AG1-008 C Adder 21.85 MW 18.57 MW
961682 AG1-008 E Adder 11.04 MW 9.39 MW
962571 AG1-106 C Adder 4.08 MW 3.47 MW
314594 6PLYMOUTH TP Adder 0.5 MW 0.42 MW
314632 6AYDLETT TAP Adder 2.17 MW 1.84 MW
316160 AE1-175 E Adder 0.57 MW 0.48 MW
316185 AD1-033 C 50/50 1.98 MW 1.98 MW
316233 AE1-074 C 50/50 3.83 MW 3.83 MW
316274 AC1-208 C Adder 14.2 MW 12.07 MW
316294 AC1-161 C 50/50 8.06 MW 8.06 MW
316316 AC1-027 C 50/50 0.51 MW 0.51 MW
917332 KELFORD E Adder 2.54 MW 2.16 MW
924516 AB2-100 E1 Adder 4.41 MW 3.75 MW
924517 AB2-100 E2 Adder 4.41 MW 3.75 MW
926206 AC1-098 E Adder 5.75 MW 4.88 MW
926214 AC1-099 E Adder 1.9 MW 1.61 MW
934065 AD1-033 E 50/50 8.06 MW 8.06 MW
937226 AE2-253 E 50/50 9.36 MW 9.36 MW
918512 AA1-065 E OP Adder 8.45 MW 7.18 MW
919153 AA1-139 E2 Adder 6.54 MW 5.56 MW
919152 AA1-139 E1 Adder 6.54 MW 5.56 MW
919710 AA2-057 E Adder 6.38 MW 5.43 MW
920692 AA2-178 E Adder 6.4 MW 5.44 MW
923994 AB2-040_E Adder 9.34 MW 7.94 MW
924814 AB2-134 E Adder 18.29 MW 15.55 MW
316084 AB2-161 E Adder 8.42 MW 7.16 MW
316088 AB2-174 E Adder 9.9 MW 8.41 MW
316375 AC2-012 C 50/50 2.16 MW 2.16 MW
932046 AC2-012 E 50/50 20.95 MW 20.95 MW
316311 AC2-079 C Adder 8.95 MW 7.61 MW
932596 AC2-079 E Adder 14.61 MW 12.42 MW
934576 AD1-082 E Adder 6.71 MW 5.71 MW
316349 AD2-085 C Adder 5.36 MW 4.56 MW
936666 AD2-085 E Adder 8.75 MW 7.44 MW
316388 AE2-253 GEN 50/50 3.15 MW 3.15 MW
961611 AG1-000B C Adder 23.65 MW 20.1 MW
941591 AE2-156 C 50/50 28.63 MW 28.63 MW
944581 AF1-123 C 50/50 72.91 MW 72.91 MW
944582 AF1-123 E 50/50 166.95 MW 166.95 MW
944591 AF1-124 C 50/50 73.17 MW 73.17 MW
944592 AF1-124 E 50/50 167.56 MW 167.56 MW
944601 AF1-125 C 50/50 71.78 MW 71.78 MW
944602 AF1-125 E 50/50 164.33 MW 164.33 MW
962491 AG1-098 C Adder 17.02 MW 14.47 MW
962492 AG1-098 E Adder 11.35 MW 9.65 MW
964241 AG1-285 C Adder 19.16 MW 16.29 MW
964242 AG1-285 E Adder 12.77 MW 10.86 MW
965281 AG1-393 C Adder 3.05 MW 2.59 MW
965282 AG1-393 E Adder 2.03 MW 1.73 MW
313764 3SOCKMAN Adder 1.08 MW 0.92 MW
932632 AC2-084 E Adder 5.08 MW 4.32 MW
934501 AD1-074 C Adder 52.01 MW 44.21 MW
934502 AD1-074 E Adder 26.47 MW 22.5 MW
934511 AD1-075 C Adder 13.0 MW 11.05 MW
934512 AD1-075 E Adder 6.62 MW 5.63 MW
934612 AD1-087 E Adder 5.46 MW 4.64 MW
935161 AD1-151 C Adder 23.1 MW 19.64 MW
935162 AD1-151 E Adder 15.4 MW 13.09 MW
937482 AD2-202 E Adder 1.6 MW 1.36 MW
938531 AE1-072 C Adder 28.11 MW 23.89 MW
938532 AE1-072 E Adder 14.65 MW 12.46 MW
939191 AE1-149 C Adder 16.1 MW 13.68 MW
939192 AE1-149 E Adder 10.73 MW 9.12 MW
940481 AE2-033 C Adder 25.03 MW 21.27 MW
940482 AE2-033 E Adder 16.87 MW 14.34 MW
940541 AE2-040 C Adder 4.45 MW 3.78 MW
940641 AE2-051 C 50/50 29.02 MW 29.02 MW
940642 AE2-051 E 50/50 19.35 MW 19.35 MW
941101 AE2-104 C Adder 5.3 MW 4.5 MW
941102 AE2-104 E Adder 8.42 MW 7.16 MW
316303 AF2-085 50/50 6.46 MW 6.46 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 37.65 MW 37.65 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 28.53 MW 28.53 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 130.06 MW 130.06 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.49 MW 5.49 MW
NY PJM->LTFIMP_NY CLTF 2.55 MW 2.55 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.51 MW 1.51 MW
WEC LTFEXP_WEC->PJM CLTF 0.79 MW 0.79 MW
CPLE LTFEXP_CPLE->PJM CLTF 15.92 MW 15.92 MW
TVA LTFEXP_TVA->PJM CLTF 7.82 MW 7.82 MW
MEC LTFEXP_MEC->PJM CLTF 4.88 MW 4.88 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.96 MW 9.96 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.3 MW 0.3 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 34.96 MW 34.96 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.59 MW 7.59 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P4-2: 557T574_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Contingency Name:
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 107.33 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4228.89 MVA
MW Contribution: 226.99 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Contingency Name:
DVP_P4-2: 557T574_SRT-S
CONTINGENCY 'DVP_P4-2: 557T574_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 118.29 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4660.82 MVA
MW Contribution: 230.14 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.75 MW 0.63 MW
961942 AG1-037 E Adder 0.5 MW 0.42 MW
962331 AG1-082 C Adder 2.98 MW 2.54 MW
962332 AG1-082 E Adder 1.99 MW 1.69 MW
963041 AG1-153 C 50/50 9.95 MW 9.95 MW
963042 AG1-153 E 50/50 14.93 MW 14.93 MW
964791 AG1-342 C Adder 4.89 MW 4.16 MW
964792 AG1-342 E Adder 3.26 MW 2.77 MW
966801 AG1-551 C Adder 3.05 MW 2.59 MW
966802 AG1-551 E Adder 1.6 MW 1.36 MW
966811 AG1-552 C Adder 3.01 MW 2.56 MW
966812 AG1-552 E Adder 1.43 MW 1.22 MW
965291 AG1-394 C Adder 1.26 MW 1.07 MW
965292 AG1-394 E Adder 2.32 MW 1.97 MW
966621 AG1-532 C Adder 2.04 MW 1.74 MW
966622 AG1-532 E Adder 1.36 MW 1.16 MW
314541 3WATKINS Adder 1.02 MW 0.87 MW
314572 3EMPORIA Adder 0.63 MW 0.54 MW
918492 AA1-063AE OP Adder 6.0 MW 5.1 MW
918532 AA1-067 E Adder 1.03 MW 0.87 MW
919692 AA2-053 E OP Adder 6.21 MW 5.28 MW
920042 AA2-088 E OP Adder 15.68 MW 13.33 MW
925785 AC1-054 E Adder 4.96 MW 4.21 MW
927146 AC1-208 E Adder 6.09 MW 5.17 MW
934521 AD1-076 C Adder 18.21 MW 15.48 MW
934522 AD1-076 E Adder 9.28 MW 7.89 MW
943172 AE2-346 E Adder 0.9 MW 0.76 MW
944011 AF1-069 C 50/50 23.43 MW 23.43 MW
944012 AF1-069 E 50/50 9.1 MW 9.1 MW
960081 AF2-299 C Adder 2.72 MW 2.31 MW
960082 AF2-299 E Adder 1.82 MW 1.54 MW
316141 AB2-099 E Adder 0.37 MW 0.32 MW
900672 V4-068 E Adder 0.53 MW 0.45 MW
917342 Z2-044 E Adder 0.94 MW 0.8 MW
923263 AB1-132 E OP Adder 8.87 MW 7.54 MW
923573 AB1-173 E OP Adder 4.8 MW 4.08 MW
924162 AB2-060 E OP Adder 6.0 MW 5.1 MW
924302 AB2-077 E O1 Adder 1.89 MW 1.6 MW
924312 AB2-078 E O1 Adder 1.89 MW 1.6 MW
924322 AB2-079 E O1 Adder 1.89 MW 1.6 MW
925612 AC1-036 E Adder 1.16 MW 0.99 MW
939181 AE1-148 C Adder 12.81 MW 10.89 MW
939182 AE1-148 E Adder 8.54 MW 7.26 MW
940492 AE2-034 E Adder 4.62 MW 3.92 MW
941031 AE2-094 C 50/50 71.7 MW 71.7 MW
941032 AE2-094 E 50/50 32.11 MW 32.11 MW
946281 AF1-292 C Adder 2.25 MW 1.92 MW
946282 AF1-292 E Adder 1.5 MW 1.28 MW
957481 AF2-042 C 50/50 85.34 MW 85.34 MW
957482 AF2-042 E 50/50 56.89 MW 56.89 MW
957521 AF2-046 C Adder 20.97 MW 17.83 MW
957522 AF2-046 E Adder 10.6 MW 9.01 MW
957861 AF2-080 C Adder 10.9 MW 9.26 MW
314539 3UNCAMP Adder 9.01 MW 7.66 MW
916042 Z1-036 E Adder 43.12 MW 36.66 MW
938771 AE1-103 C Adder 4.34 MW 3.69 MW
938772 AE1-103 E Adder 6.0 MW 5.1 MW
314331 6POE Adder 1.7 MW 1.45 MW
314507 3THOMPSN Adder 3.07 MW 2.61 MW
314525 6KINGFORK Adder 1.48 MW 1.26 MW
314550 6HICKORY 50/50 3.36 MW 3.36 MW
315092 1YORKTN3 Adder 167.73 MW 142.57 MW
926662 AC1-147 E Adder 2.01 MW 1.71 MW
926755 AC1-161 E 50/50 20.6 MW 20.6 MW
935112 AD1-144 E Adder 1.37 MW 1.17 MW
942341 AE2-247 C Adder 2.1 MW 1.79 MW
942342 AE2-247 E Adder 2.91 MW 2.47 MW
943461 AF1-017 C Adder 1.9 MW 1.62 MW
943462 AF1-017 E Adder 3.11 MW 2.64 MW
943612 AF1-032 E Adder 1.4 MW 1.19 MW
315102 1BRUNSWICKG1 50/50 14.69 MW 14.69 MW
315103 1BRUNSWICKG2 50/50 14.69 MW 14.69 MW
315104 1BRUNSWICKG3 50/50 14.69 MW 14.69 MW
315105 1BRUNSWICKS1 50/50 30.52 MW 30.52 MW
315108 1ELIZAR1 50/50 4.88 MW 4.88 MW
315109 1ELIZAR2 50/50 4.79 MW 4.79 MW
315110 1ELIZAR3 50/50 4.94 MW 4.94 MW
315241 1Z1-086 GT1 50/50 18.83 MW 18.83 MW
315242 1Z1-086 GT2 50/50 18.82 MW 18.82 MW
315243 1Z1-086 GT3 50/50 18.82 MW 18.82 MW
315244 1Z1-086 ST 50/50 32.77 MW 32.77 MW
315260 1GOSPORTA 50/50 3.23 MW 3.23 MW
315261 1GOSPORTB 50/50 4.13 MW 4.13 MW
315262 1GOSPORTC 50/50 3.51 MW 3.51 MW
913392 Y1-086 E Adder 3.36 MW 2.85 MW
916192 Z1-068 E 50/50 2.88 MW 2.88 MW
923832 AB2-022 E Adder 1.9 MW 1.61 MW
923852 AB2-025 E Adder 1.71 MW 1.46 MW
939312 AE1-162 E Adder 1.94 MW 1.65 MW
957492 AF2-043 E Adder 2.15 MW 1.83 MW
901082 W1-029 E Adder 48.36 MW 41.1 MW
917122 Z2-027 E Adder 2.05 MW 1.74 MW
925522 AC1-027 E 50/50 1.86 MW 1.86 MW
957871 AF2-081 C 50/50 15.37 MW 15.37 MW
957872 AF2-081 E 50/50 6.59 MW 6.59 MW
958161 AF2-110 C Adder 2.03 MW 1.73 MW
958162 AF2-110 E Adder 3.23 MW 2.75 MW
314722 3TWITTYS Adder 1.29 MW 1.09 MW
926071 AC1-086 C Adder 30.49 MW 25.91 MW
926072 AC1-086 E Adder 13.88 MW 11.79 MW
927021 AC1-189 C Adder 12.0 MW 10.2 MW
927022 AC1-189 E Adder 3.71 MW 3.15 MW
933291 AC2-141 C 50/50 48.25 MW 48.25 MW
933292 AC2-141 E 50/50 20.6 MW 20.6 MW
934621 AD1-088 C Adder 18.74 MW 15.93 MW
934622 AD1-088 E Adder 8.82 MW 7.5 MW
939411 AE1-173 C 50/50 157.55 MW 157.55 MW
939412 AE1-173 E 50/50 105.03 MW 105.03 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 13.01 MW 11.06 MW
933982 AD1-022 E Adder 7.08 MW 6.02 MW
962572 AG1-106 E Adder 1.72 MW 1.47 MW
961681 AG1-008 C Adder 20.97 MW 17.83 MW
961682 AG1-008 E Adder 10.6 MW 9.01 MW
962571 AG1-106 C Adder 3.94 MW 3.35 MW
314594 6PLYMOUTH TP Adder 0.48 MW 0.41 MW
314632 6AYDLETT TAP 50/50 2.08 MW 2.08 MW
316185 AD1-033 C 50/50 1.9 MW 1.9 MW
316274 AC1-208 C Adder 13.7 MW 11.65 MW
316294 AC1-161 C 50/50 7.88 MW 7.88 MW
316316 AC1-027 C 50/50 0.48 MW 0.48 MW
917332 KELFORD E Adder 2.45 MW 2.09 MW
924516 AB2-100 E1 Adder 4.23 MW 3.6 MW
924517 AB2-100 E2 Adder 4.23 MW 3.6 MW
926206 AC1-098 E Adder 5.54 MW 4.71 MW
926214 AC1-099 E Adder 1.83 MW 1.56 MW
934065 AD1-033 E 50/50 7.74 MW 7.74 MW
937226 AE2-253 E 50/50 9.0 MW 9.0 MW
918512 AA1-065 E OP Adder 8.15 MW 6.93 MW
316017 AA1-139 ULT1 50/50 1.66 MW 1.66 MW
316018 AA1-139 ULT2 50/50 1.66 MW 1.66 MW
919153 AA1-139 E2 50/50 6.29 MW 6.29 MW
919152 AA1-139 E1 50/50 6.29 MW 6.29 MW
919710 AA2-057 E Adder 6.16 MW 5.24 MW
920692 AA2-178 E Adder 6.16 MW 5.23 MW
923994 AB2-040_E Adder 8.99 MW 7.64 MW
924022 AB2-043 E O1 Adder 7.32 MW 6.22 MW
316084 AB2-161 E Adder 7.16 MW 6.09 MW
925122 AB2-169 E Adder 8.42 MW 7.16 MW
316088 AB2-174 E Adder 9.52 MW 8.09 MW
932046 AC2-012 E Adder 19.89 MW 16.91 MW
316311 AC2-079 C Adder 8.14 MW 6.92 MW
932596 AC2-079 E Adder 13.28 MW 11.29 MW
934576 AD1-082 E Adder 5.71 MW 4.85 MW
316349 AD2-085 C Adder 4.85 MW 4.13 MW
936666 AD2-085 E Adder 7.92 MW 6.73 MW
316388 AE2-253 GEN 50/50 3.03 MW 3.03 MW
941591 AE2-156 C 50/50 27.2 MW 27.2 MW
944581 AF1-123 C 50/50 70.09 MW 70.09 MW
944582 AF1-123 E 50/50 160.5 MW 160.5 MW
944591 AF1-124 C 50/50 70.34 MW 70.34 MW
944592 AF1-124 E 50/50 161.08 MW 161.08 MW
944601 AF1-125 C 50/50 69.01 MW 69.01 MW
944602 AF1-125 E 50/50 157.98 MW 157.98 MW
962491 AG1-098 C Adder 16.62 MW 14.13 MW
962492 AG1-098 E Adder 11.08 MW 9.42 MW
962561 AG1-105 C Adder 12.3 MW 10.46 MW
962562 AG1-105 E Adder 8.2 MW 6.97 MW
964241 AG1-285 C Adder 18.38 MW 15.63 MW
964242 AG1-285 E Adder 12.26 MW 10.42 MW
313764 3SOCKMAN Adder 1.04 MW 0.89 MW
932632 AC2-084 E Adder 4.9 MW 4.17 MW
934321 AD1-056 C Adder 8.91 MW 7.57 MW
934322 AD1-056 E Adder 4.83 MW 4.11 MW
934331 AD1-057 C Adder 4.97 MW 4.22 MW
934332 AD1-057 E Adder 2.59 MW 2.2 MW
934501 AD1-074 C Adder 50.15 MW 42.63 MW
934502 AD1-074 E Adder 25.53 MW 21.7 MW
934511 AD1-075 C Adder 12.54 MW 10.66 MW
934512 AD1-075 E Adder 6.38 MW 5.42 MW
934612 AD1-087 E Adder 5.52 MW 4.69 MW
935172 AD1-152 E Adder 8.1 MW 6.88 MW
937482 AD2-202 E Adder 1.62 MW 1.37 MW
938531 AE1-072 C 50/50 27.0 MW 27.0 MW
938532 AE1-072 E 50/50 14.07 MW 14.07 MW
940481 AE2-033 C Adder 23.87 MW 20.29 MW
940482 AE2-033 E Adder 16.09 MW 13.68 MW
940541 AE2-040 C Adder 4.24 MW 3.6 MW
940641 AE2-051 C 50/50 31.13 MW 31.13 MW
940642 AE2-051 E 50/50 20.75 MW 20.75 MW
941101 AE2-104 C Adder 4.98 MW 4.23 MW
941102 AE2-104 E Adder 7.91 MW 6.73 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 35.4 MW 35.4 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 27.72 MW 27.72 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 131.32 MW 131.32 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.67 MW 4.67 MW
NY PJM->LTFIMP_NY CLTF 2.19 MW 2.19 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.4 MW 1.4 MW
WEC LTFEXP_WEC->PJM CLTF 0.74 MW 0.74 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.18 MW 16.18 MW
TVA LTFEXP_TVA->PJM CLTF 7.65 MW 7.65 MW
MEC LTFEXP_MEC->PJM CLTF 4.67 MW 4.67 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.79 MW 9.79 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.28 MW 0.28 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 29.78 MW 29.78 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.71 MW 7.71 MW

Details for 8CARSON-6CARSON 500.0/230.0 kV Ckt 2 transformer l/o DVP_P4-2: 56372_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8CARSON-6CARSON 500.0/230.0 kV Ckt 2 transformer
314902 to 314282 ckt 2
Contingency Name:
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 118.17 %
Rating: 1056.8 MVA
Rating Type: C
MVA to Mitigate: 1248.84 MVA
MW Contribution: 53.47 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: DVP
Facility Description:
8CARSON-6CARSON 500.0/230.0 kV Ckt 2 transformer
314902 to 314282 ckt 2
Contingency Name:
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 117.25 %
Rating: 1056.8 MVA
Rating Type: C
MVA to Mitigate: 1239.09 MVA
MW Contribution: 55.94 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C Adder 0.61 MW 0.52 MW
961792 AG1-021 E Adder 0.52 MW 0.44 MW
963041 AG1-153 C 50/50 4.78 MW 4.78 MW
963042 AG1-153 E 50/50 7.17 MW 7.17 MW
963171 AG1-166 C Adder 0.34 MW 0.29 MW
963172 AG1-166 E Adder 0.8 MW 0.68 MW
963181 AG1-167 C Adder 0.26 MW 0.22 MW
963182 AG1-167 E Adder 0.6 MW 0.51 MW
963191 AG1-168 C Adder 0.26 MW 0.22 MW
963192 AG1-168 E Adder 0.6 MW 0.51 MW
964791 AG1-342 C Adder 1.5 MW 1.27 MW
964792 AG1-342 E Adder 1.0 MW 0.85 MW
966621 AG1-532 C Adder -1.15 MW -0.98 MW
313853 3PONTONDP Adder 0.23 MW 0.19 MW
314572 3EMPORIA Adder -0.33 MW -0.28 MW
314713 3PAMPLIN Adder 0.39 MW 0.33 MW
315153 1CLOVER1 50/50 8.08 MW 8.08 MW
315154 1CLOVER2 50/50 8.01 MW 8.01 MW
926274 AC1-105 E Adder 1.2 MW 1.02 MW
943902 AF1-058 E Adder 0.61 MW 0.52 MW
944011 AF1-069 C 50/50 11.48 MW 11.48 MW
944012 AF1-069 E 50/50 4.46 MW 4.46 MW
959311 AF2-222 C Adder 7.57 MW 6.44 MW
959312 AF2-222 E Adder 5.07 MW 4.31 MW
960061 AF2-297 C Adder 3.67 MW 3.12 MW
960062 AF2-297 E Adder 2.45 MW 2.08 MW
924162 AB2-060 E OP Adder 1.51 MW 1.28 MW
924302 AB2-077 E O1 Adder 0.47 MW 0.4 MW
924312 AB2-078 E O1 Adder 0.47 MW 0.4 MW
924322 AB2-079 E O1 Adder 0.47 MW 0.4 MW
925612 AC1-036 E Adder 0.4 MW 0.34 MW
938371 AE1-056 C Adder 2.55 MW 2.17 MW
938372 AE1-056 E Adder 1.39 MW 1.18 MW
941031 AE2-094 C 50/50 35.15 MW 35.15 MW
941032 AE2-094 E 50/50 15.74 MW 15.74 MW
946281 AF1-292 C Adder -1.27 MW -1.08 MW
946301 AF1-294 C Adder 1.26 MW 1.07 MW
946302 AF1-294 E Adder 1.07 MW 0.91 MW
957481 AF2-042 C 50/50 37.04 MW 37.04 MW
957482 AF2-042 E 50/50 24.7 MW 24.7 MW
958211 AF2-115 C Adder 0.77 MW 0.65 MW
958212 AF2-115 E Adder 0.65 MW 0.56 MW
314507 3THOMPSN Adder 0.66 MW 0.56 MW
314550 6HICKORY Adder 0.78 MW 0.66 MW
926662 AC1-147 E Adder 0.43 MW 0.37 MW
926755 AC1-161 E Adder 6.18 MW 5.25 MW
315102 1BRUNSWICKG1 50/50 7.05 MW 7.05 MW
315103 1BRUNSWICKG2 50/50 7.05 MW 7.05 MW
315104 1BRUNSWICKG3 50/50 7.05 MW 7.05 MW
315105 1BRUNSWICKS1 50/50 14.65 MW 14.65 MW
315241 1Z1-086 GT1 50/50 9.1 MW 9.1 MW
315242 1Z1-086 GT2 50/50 9.09 MW 9.09 MW
315243 1Z1-086 GT3 50/50 9.09 MW 9.09 MW
315244 1Z1-086 ST 50/50 15.84 MW 15.84 MW
315260 1GOSPORTA Adder 0.69 MW 0.59 MW
315261 1GOSPORTB Adder 0.88 MW 0.75 MW
315262 1GOSPORTC Adder 0.75 MW 0.64 MW
916192 Z1-068 E Adder 0.64 MW 0.55 MW
925522 AC1-027 E Adder 0.41 MW 0.35 MW
942001 AE2-212 C Adder -2.89 MW -2.46 MW
957871 AF2-081 C Adder 3.35 MW 2.84 MW
957872 AF2-081 E Adder 1.43 MW 1.22 MW
314722 3TWITTYS Adder 0.44 MW 0.37 MW
936261 AD2-033 C Adder 4.53 MW 3.85 MW
936262 AD2-033 E Adder 3.02 MW 2.56 MW
933291 AC2-141 C Adder 14.48 MW 12.31 MW
933292 AC2-141 E Adder 6.18 MW 5.25 MW
934621 AD1-088 C 50/50 7.68 MW 7.68 MW
934622 AD1-088 E 50/50 3.61 MW 3.61 MW
939411 AE1-173 C 50/50 65.67 MW 65.67 MW
939412 AE1-173 E 50/50 43.78 MW 43.78 MW
314632 6AYDLETT TAP Adder 0.44 MW 0.37 MW
316240 AF1-291 C Adder -2.29 MW -1.95 MW
927255 AC1-221 E Adder 1.77 MW 1.5 MW
927264 AC1-222 E Adder 1.85 MW 1.57 MW
932763 AC2-100 E Adder 1.19 MW 1.01 MW
934065 AD1-033 E Adder 1.81 MW 1.54 MW
937226 AE2-253 E Adder 2.0 MW 1.7 MW
919153 AA1-139 E2 Adder 1.37 MW 1.16 MW
919152 AA1-139 E1 Adder 1.37 MW 1.16 MW
924022 AB2-043 E O1 Adder 1.83 MW 1.55 MW
925997 AC1-075 E Adder 1.16 MW 0.99 MW
926024 AC1-080 E Adder 0.39 MW 0.33 MW
932046 AC2-012 E Adder 4.26 MW 3.62 MW
941591 AE2-156 C Adder 5.87 MW 4.99 MW
944581 AF1-123 C Adder 16.51 MW 14.03 MW
944582 AF1-123 E Adder 37.8 MW 32.13 MW
944591 AF1-124 C Adder 16.57 MW 14.08 MW
944592 AF1-124 E Adder 37.94 MW 32.25 MW
944601 AF1-125 C Adder 16.25 MW 13.82 MW
944602 AF1-125 E Adder 37.21 MW 31.63 MW
962491 AG1-098 C 50/50 6.8 MW 6.8 MW
962492 AG1-098 E 50/50 4.53 MW 4.53 MW
962561 AG1-105 C Adder 3.65 MW 3.1 MW
962562 AG1-105 E Adder 2.43 MW 2.07 MW
964241 AG1-285 C Adder 6.24 MW 5.3 MW
964242 AG1-285 E Adder 4.16 MW 3.53 MW
313764 3SOCKMAN Adder -0.36 MW -0.3 MW
934321 AD1-056 C Adder -2.09 MW -1.77 MW
934331 AD1-057 C Adder -1.16 MW -0.99 MW
934611 AD1-087 C 50/50 0.8 MW 0.8 MW
934612 AD1-087 E 50/50 2.29 MW 2.29 MW
935171 AD1-152 C 50/50 0.78 MW 0.78 MW
935172 AD1-152 E 50/50 3.22 MW 3.22 MW
937481 AD2-202 C 50/50 0.23 MW 0.23 MW
937482 AD2-202 E 50/50 0.67 MW 0.67 MW
938531 AE1-072 C Adder 5.73 MW 4.87 MW
938532 AE1-072 E Adder 2.99 MW 2.54 MW
940641 AE2-051 C 50/50 14.59 MW 14.59 MW
940642 AE2-051 E 50/50 9.72 MW 9.72 MW
942461 AE2-259 C Adder 3.47 MW 2.95 MW
942462 AE2-259 E Adder 2.31 MW 1.96 MW
944641 AF1-129 C Adder -100.83 MW -85.7 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 12.74 MW 12.74 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 8.87 MW 8.87 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 37.76 MW 37.76 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.0 MW 1.0 MW
NY PJM->LTFIMP_NY CLTF 0.46 MW 0.46 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.49 MW 0.49 MW
WEC LTFEXP_WEC->PJM CLTF 0.26 MW 0.26 MW
CPLE LTFEXP_CPLE->PJM CLTF 4.31 MW 4.31 MW
TVA LTFEXP_TVA->PJM CLTF 2.38 MW 2.38 MW
MEC LTFEXP_MEC->PJM CLTF 1.57 MW 1.57 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.05 MW 3.05 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.1 MW 0.1 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.34 MW 6.34 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.06 MW 2.06 MW

Details for 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P4-2: 563T576_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
Contingency Name:
DVP_P4-2: 563T576_SRT-S
CONTINGENCY 'DVP_P4-2: 563T576_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 102.26 %
Rating: 3144.0 MVA
Rating Type: C
MVA to Mitigate: 3215.2 MVA
MW Contribution: 246.18 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
Contingency Name:
DVP_P4-2: 563T576_SRT-S
CONTINGENCY 'DVP_P4-2: 563T576_SRT-S'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 107.02 %
Rating: 3144.0 MVA
Rating Type: C
MVA to Mitigate: 3364.71 MVA
MW Contribution: 249.05 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.06 MW 0.9 MW
961672 AG1-007 E Adder 0.6 MW 0.51 MW
961941 AG1-037 C Adder 0.67 MW 0.57 MW
961942 AG1-037 E Adder 0.45 MW 0.38 MW
962331 AG1-082 C Adder 2.67 MW 2.27 MW
962332 AG1-082 E Adder 1.78 MW 1.51 MW
963041 AG1-153 C Adder 6.86 MW 5.83 MW
963042 AG1-153 E Adder 10.28 MW 8.74 MW
964791 AG1-342 C Adder 3.49 MW 2.96 MW
964792 AG1-342 E Adder 2.33 MW 1.98 MW
966801 AG1-551 C Adder 2.65 MW 2.25 MW
966802 AG1-551 E Adder 1.4 MW 1.19 MW
966811 AG1-552 C Adder 2.45 MW 2.08 MW
966812 AG1-552 E Adder 1.16 MW 0.99 MW
965291 AG1-394 C Adder 1.13 MW 0.96 MW
965292 AG1-394 E Adder 2.08 MW 1.77 MW
966621 AG1-532 C Adder 1.56 MW 1.32 MW
966622 AG1-532 E Adder 1.04 MW 0.88 MW
314541 3WATKINS Adder 0.96 MW 0.81 MW
314572 3EMPORIA Adder 0.48 MW 0.41 MW
315131 1EDGECMA Adder 17.13 MW 14.56 MW
918492 AA1-063AE OP Adder 5.08 MW 4.32 MW
918532 AA1-067 E Adder 0.88 MW 0.74 MW
919692 AA2-053 E OP Adder 5.13 MW 4.36 MW
920042 AA2-088 E OP Adder 14.14 MW 12.02 MW
925785 AC1-054 E Adder 3.81 MW 3.24 MW
926274 AC1-105 E Adder 0.55 MW 0.47 MW
927146 AC1-208 E Adder 5.09 MW 4.33 MW
934521 AD1-076 C Adder 17.3 MW 14.7 MW
934522 AD1-076 E Adder 8.82 MW 7.5 MW
943172 AE2-346 E Adder 0.8 MW 0.68 MW
944011 AF1-069 C Adder 16.1 MW 13.68 MW
944012 AF1-069 E Adder 6.25 MW 5.32 MW
959311 AF2-222 C Adder 16.0 MW 13.6 MW
959312 AF2-222 E Adder 10.72 MW 9.11 MW
960081 AF2-299 C Adder 2.08 MW 1.76 MW
960082 AF2-299 E Adder 1.38 MW 1.18 MW
316141 AB2-099 E Adder 0.33 MW 0.28 MW
900672 V4-068 E Adder 0.47 MW 0.4 MW
917342 Z2-044 E Adder 0.79 MW 0.67 MW
922923 AB1-081 E OP Adder 4.22 MW 3.59 MW
923263 AB1-132 E OP Adder 7.05 MW 6.0 MW
923573 AB1-173 E OP Adder 3.76 MW 3.2 MW
924162 AB2-060 E OP Adder 4.33 MW 3.68 MW
924302 AB2-077 E O1 Adder 1.36 MW 1.16 MW
924312 AB2-078 E O1 Adder 1.36 MW 1.16 MW
924322 AB2-079 E O1 Adder 1.36 MW 1.16 MW
925612 AC1-036 E Adder 0.84 MW 0.71 MW
939181 AE1-148 C Adder 9.38 MW 7.97 MW
939182 AE1-148 E Adder 6.25 MW 5.31 MW
940492 AE2-034 E Adder 4.5 MW 3.83 MW
941031 AE2-094 C Adder 49.26 MW 41.87 MW
941032 AE2-094 E Adder 22.06 MW 18.75 MW
946281 AF1-292 C Adder 1.72 MW 1.46 MW
946282 AF1-292 E Adder 1.14 MW 0.97 MW
957481 AF2-042 C Adder 59.6 MW 50.66 MW
957482 AF2-042 E Adder 39.74 MW 33.77 MW
957521 AF2-046 C Adder 18.79 MW 15.97 MW
957522 AF2-046 E Adder 9.5 MW 8.07 MW
957861 AF2-080 C Adder 9.04 MW 7.68 MW
957862 AF2-080 E Adder 4.0 MW 3.4 MW
314539 3UNCAMP Adder 8.59 MW 7.3 MW
916042 Z1-036 E Adder 43.42 MW 36.91 MW
938771 AE1-103 C Adder 4.18 MW 3.55 MW
938772 AE1-103 E Adder 5.77 MW 4.91 MW
314507 3THOMPSN Adder 3.3 MW 2.8 MW
314525 6KINGFORK Adder 1.53 MW 1.3 MW
314550 6HICKORY 50/50 3.64 MW 3.64 MW
315092 1YORKTN3 Adder 182.37 MW 155.02 MW
926662 AC1-147 E 50/50 2.16 MW 2.16 MW
926755 AC1-161 E 50/50 24.41 MW 24.41 MW
927226 AC1-216 E Adder 7.2 MW 6.12 MW
935112 AD1-144 E Adder 1.42 MW 1.21 MW
942341 AE2-247 C Adder 2.0 MW 1.7 MW
942342 AE2-247 E Adder 2.76 MW 2.34 MW
943461 AF1-017 C Adder 1.81 MW 1.53 MW
943462 AF1-017 E Adder 2.95 MW 2.5 MW
943612 AF1-032 E Adder 1.46 MW 1.24 MW
315098 1CHESPKA 50/50 0.71 MW 0.71 MW
315099 1CHESPKB 50/50 1.18 MW 1.18 MW
315108 1ELIZAR1 50/50 5.25 MW 5.25 MW
315109 1ELIZAR2 50/50 5.16 MW 5.16 MW
315110 1ELIZAR3 50/50 5.32 MW 5.32 MW
315233 1SURRY 2 50/50 52.27 MW 52.27 MW
315260 1GOSPORTA Adder 3.48 MW 2.96 MW
315261 1GOSPORTB 50/50 4.44 MW 4.44 MW
315262 1GOSPORTC 50/50 3.77 MW 3.77 MW
913392 Y1-086 E Adder 3.54 MW 3.01 MW
916192 Z1-068 E 50/50 3.11 MW 3.11 MW
923832 AB2-022 E Adder 2.0 MW 1.7 MW
923852 AB2-025 E Adder 1.22 MW 1.03 MW
939312 AE1-162 E Adder 1.97 MW 1.67 MW
957492 AF2-043 E Adder 2.25 MW 1.91 MW
962962 AG1-145 E Adder 1.4 MW 1.19 MW
901082 W1-029 E Adder 50.02 MW 42.52 MW
917122 Z2-027 E Adder 2.14 MW 1.82 MW
925522 AC1-027 E 50/50 2.01 MW 2.01 MW
957832 AF2-077 E Adder 1.41 MW 1.2 MW
957871 AF2-081 C 50/50 16.49 MW 16.49 MW
957872 AF2-081 E 50/50 7.07 MW 7.07 MW
958161 AF2-110 C Adder 2.05 MW 1.75 MW
958162 AF2-110 E Adder 3.27 MW 2.78 MW
314722 3TWITTYS Adder 0.93 MW 0.79 MW
917512 Z2-088 E OP1 Adder 5.69 MW 4.83 MW
926071 AC1-086 C Adder 24.24 MW 20.6 MW
926072 AC1-086 E Adder 11.03 MW 9.38 MW
927021 AC1-189 C Adder 9.95 MW 8.46 MW
927022 AC1-189 E Adder 4.96 MW 4.21 MW
933291 AC2-141 C 50/50 57.19 MW 57.19 MW
933292 AC2-141 E 50/50 24.41 MW 24.41 MW
934621 AD1-088 C Adder 13.21 MW 11.23 MW
934622 AD1-088 E Adder 6.22 MW 5.28 MW
939411 AE1-173 C Adder 130.54 MW 110.96 MW
939412 AE1-173 E Adder 87.03 MW 73.97 MW
934012 AD1-025 E Adder 9.32 MW 7.92 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 12.21 MW 10.38 MW
933982 AD1-022 E Adder 6.65 MW 5.65 MW
962572 AG1-106 E Adder 1.37 MW 1.17 MW
961681 AG1-008 C Adder 18.79 MW 15.97 MW
961682 AG1-008 E Adder 9.5 MW 8.07 MW
962571 AG1-106 C Adder 3.14 MW 2.67 MW
314594 6PLYMOUTH TP Adder 0.46 MW 0.39 MW
314632 6AYDLETT TAP Adder 2.22 MW 1.89 MW
316036 AC1-147 C 50/50 0.6 MW 0.6 MW
316160 AE1-175 E Adder 1.15 MW 0.98 MW
316185 AD1-033 C 50/50 2.06 MW 2.06 MW
316263 AC1-034 C Adder 7.48 MW 6.36 MW
316274 AC1-208 C Adder 11.47 MW 9.75 MW
316294 AC1-161 C 50/50 9.35 MW 9.35 MW
316316 AC1-027 C 50/50 0.52 MW 0.52 MW
917332 KELFORD E Adder 2.16 MW 1.83 MW
924516 AB2-100 E1 Adder 3.2 MW 2.72 MW
924517 AB2-100 E2 Adder 3.2 MW 2.72 MW
925595 AC1-034 E Adder 5.65 MW 4.8 MW
926206 AC1-098 E Adder 4.71 MW 4.0 MW
926214 AC1-099 E Adder 1.56 MW 1.32 MW
934065 AD1-033 E 50/50 8.39 MW 8.39 MW
937226 AE2-253 E 50/50 9.68 MW 9.68 MW
918512 AA1-065 E OP Adder 7.39 MW 6.28 MW
316017 AA1-139 ULT1 50/50 1.78 MW 1.78 MW
316018 AA1-139 ULT2 50/50 1.78 MW 1.78 MW
919153 AA1-139 E2 50/50 6.74 MW 6.74 MW
919152 AA1-139 E1 50/50 6.74 MW 6.74 MW
919710 AA2-057 E Adder 5.17 MW 4.4 MW
920692 AA2-178 E Adder 6.0 MW 5.1 MW
923994 AB2-040_E Adder 7.06 MW 6.0 MW
924022 AB2-043 E O1 Adder 5.28 MW 4.49 MW
924152 AB2-059 E OP Adder 5.92 MW 5.03 MW
924814 AB2-134 E Adder 11.79 MW 10.02 MW
316084 AB2-161 E Adder 6.01 MW 5.11 MW
925122 AB2-169 E Adder 7.62 MW 6.47 MW
316088 AB2-174 E Adder 7.4 MW 6.29 MW
316375 AC2-012 C 50/50 2.21 MW 2.21 MW
932046 AC2-012 E 50/50 21.39 MW 21.39 MW
316311 AC2-079 C Adder 7.79 MW 6.62 MW
932596 AC2-079 E Adder 12.72 MW 10.81 MW
934576 AD1-082 E Adder 4.79 MW 4.07 MW
316349 AD2-085 C Adder 4.61 MW 3.92 MW
936666 AD2-085 E Adder 7.52 MW 6.39 MW
316388 AE2-253 GEN 50/50 3.26 MW 3.26 MW
961611 AG1-000B C Adder 18.13 MW 15.41 MW
941591 AE2-156 C 50/50 29.28 MW 29.28 MW
944581 AF1-123 C 50/50 76.02 MW 76.02 MW
944582 AF1-123 E 50/50 174.06 MW 174.06 MW
944591 AF1-124 C 50/50 76.28 MW 76.28 MW
944592 AF1-124 E 50/50 174.7 MW 174.7 MW
944601 AF1-125 C 50/50 74.84 MW 74.84 MW
944602 AF1-125 E 50/50 171.33 MW 171.33 MW
962491 AG1-098 C Adder 11.73 MW 9.97 MW
962492 AG1-098 E Adder 7.82 MW 6.65 MW
962561 AG1-105 C Adder 8.8 MW 7.48 MW
962562 AG1-105 E Adder 5.86 MW 4.98 MW
964241 AG1-285 C Adder 13.12 MW 11.15 MW
964242 AG1-285 E Adder 8.75 MW 7.43 MW
313764 3SOCKMAN Adder 0.83 MW 0.71 MW
932632 AC2-084 E Adder 4.16 MW 3.54 MW
934321 AD1-056 C Adder 7.04 MW 5.98 MW
934322 AD1-056 E Adder 3.82 MW 3.25 MW
934331 AD1-057 C Adder 3.93 MW 3.34 MW
934332 AD1-057 E Adder 2.04 MW 1.74 MW
934501 AD1-074 C Adder 47.63 MW 40.49 MW
934502 AD1-074 E Adder 24.25 MW 20.61 MW
934511 AD1-075 C Adder 11.91 MW 10.12 MW
934512 AD1-075 E Adder 6.06 MW 5.15 MW
934612 AD1-087 E Adder 3.87 MW 3.29 MW
935172 AD1-152 E Adder 5.69 MW 4.84 MW
937482 AD2-202 E Adder 1.13 MW 0.96 MW
938531 AE1-072 C 50/50 28.87 MW 28.87 MW
938532 AE1-072 E 50/50 15.05 MW 15.05 MW
939191 AE1-149 C Adder 9.8 MW 8.33 MW
939192 AE1-149 E Adder 6.53 MW 5.55 MW
940481 AE2-033 C Adder 17.07 MW 14.51 MW
940482 AE2-033 E Adder 11.51 MW 9.78 MW
940541 AE2-040 C Adder 3.01 MW 2.56 MW
940641 AE2-051 C Adder 23.72 MW 20.16 MW
940642 AE2-051 E Adder 15.81 MW 13.44 MW
941101 AE2-104 C Adder 5.03 MW 4.28 MW
941102 AE2-104 E Adder 8.0 MW 6.8 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 19.03 MW 19.03 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 17.52 MW 17.52 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 92.84 MW 92.84 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.12 MW 3.12 MW
NY PJM->LTFIMP_NY CLTF 1.49 MW 1.49 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.77 MW 0.77 MW
WEC LTFEXP_WEC->PJM CLTF 0.41 MW 0.41 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.71 MW 11.71 MW
TVA LTFEXP_TVA->PJM CLTF 4.99 MW 4.99 MW
MEC LTFEXP_MEC->PJM CLTF 2.75 MW 2.75 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.43 MW 6.43 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.16 MW 0.16 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 19.92 MW 19.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.58 MW 5.58 MW

Details for 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P4-2: 56372_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
Contingency Name:
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.94 %
Rating: 3144.0 MVA
Rating Type: C
MVA to Mitigate: 3205.05 MVA
MW Contribution: 244.47 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
Contingency Name:
DVP_P4-2: 56372_SRT-S
CONTINGENCY 'DVP_P4-2: 56372_SRT-S'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1                /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 106.06 %
Rating: 3144.0 MVA
Rating Type: C
MVA to Mitigate: 3334.59 MVA
MW Contribution: 246.73 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.03 MW 0.88 MW
961672 AG1-007 E Adder 0.58 MW 0.5 MW
961941 AG1-037 C Adder 0.65 MW 0.55 MW
961942 AG1-037 E Adder 0.43 MW 0.37 MW
962331 AG1-082 C Adder 2.6 MW 2.21 MW
962332 AG1-082 E Adder 1.73 MW 1.47 MW
963041 AG1-153 C Adder 6.95 MW 5.91 MW
963042 AG1-153 E Adder 10.42 MW 8.86 MW
964791 AG1-342 C Adder 3.46 MW 2.94 MW
964792 AG1-342 E Adder 2.31 MW 1.96 MW
966801 AG1-551 C Adder 2.59 MW 2.2 MW
966802 AG1-551 E Adder 1.36 MW 1.16 MW
966811 AG1-552 C Adder 2.34 MW 1.99 MW
966812 AG1-552 E Adder 1.11 MW 0.94 MW
965291 AG1-394 C Adder 1.1 MW 0.93 MW
965292 AG1-394 E Adder 2.02 MW 1.72 MW
966621 AG1-532 C Adder 1.45 MW 1.23 MW
966622 AG1-532 E Adder 0.97 MW 0.82 MW
314541 3WATKINS Adder 0.93 MW 0.79 MW
314572 3EMPORIA Adder 0.45 MW 0.38 MW
315131 1EDGECMA Adder 16.62 MW 14.13 MW
918492 AA1-063AE OP Adder 4.88 MW 4.15 MW
918532 AA1-067 E Adder 0.85 MW 0.73 MW
919692 AA2-053 E OP Adder 4.92 MW 4.18 MW
920042 AA2-088 E OP Adder 13.72 MW 11.66 MW
925785 AC1-054 E Adder 3.7 MW 3.15 MW
926274 AC1-105 E Adder 2.6 MW 2.21 MW
927146 AC1-208 E Adder 4.89 MW 4.16 MW
934521 AD1-076 C Adder 16.95 MW 14.41 MW
934522 AD1-076 E Adder 8.64 MW 7.34 MW
943172 AE2-346 E Adder 0.78 MW 0.66 MW
943902 AF1-058 E Adder 0.87 MW 0.74 MW
944011 AF1-069 C Adder 16.33 MW 13.88 MW
944012 AF1-069 E Adder 6.35 MW 5.39 MW
959311 AF2-222 C Adder 15.78 MW 13.42 MW
959312 AF2-222 E Adder 10.58 MW 8.99 MW
960061 AF2-297 C Adder 7.42 MW 6.31 MW
960062 AF2-297 E Adder 4.95 MW 4.21 MW
960081 AF2-299 C Adder 1.93 MW 1.64 MW
960082 AF2-299 E Adder 1.29 MW 1.09 MW
316141 AB2-099 E Adder 0.32 MW 0.28 MW
900672 V4-068 E Adder 0.46 MW 0.39 MW
917342 Z2-044 E Adder 0.76 MW 0.65 MW
922923 AB1-081 E OP Adder 4.1 MW 3.49 MW
923263 AB1-132 E OP Adder 6.64 MW 5.65 MW
923573 AB1-173 E OP Adder 3.55 MW 3.02 MW
924162 AB2-060 E OP Adder 4.27 MW 3.63 MW
924302 AB2-077 E O1 Adder 1.34 MW 1.14 MW
924312 AB2-078 E O1 Adder 1.34 MW 1.14 MW
924322 AB2-079 E O1 Adder 1.34 MW 1.14 MW
925612 AC1-036 E Adder 0.83 MW 0.7 MW
939181 AE1-148 C Adder 9.24 MW 7.85 MW
939182 AE1-148 E Adder 6.16 MW 5.23 MW
940492 AE2-034 E Adder 4.42 MW 3.76 MW
941031 AE2-094 C Adder 49.99 MW 42.49 MW
941032 AE2-094 E Adder 22.39 MW 19.03 MW
946281 AF1-292 C Adder 1.6 MW 1.36 MW
946282 AF1-292 E Adder 1.07 MW 0.91 MW
957481 AF2-042 C Adder 59.92 MW 50.93 MW
957482 AF2-042 E Adder 39.94 MW 33.95 MW
957521 AF2-046 C Adder 18.23 MW 15.5 MW
957522 AF2-046 E Adder 9.21 MW 7.83 MW
957861 AF2-080 C Adder 8.8 MW 7.48 MW
957862 AF2-080 E Adder 3.9 MW 3.32 MW
314539 3UNCAMP Adder 8.38 MW 7.12 MW
916042 Z1-036 E Adder 42.8 MW 36.38 MW
938771 AE1-103 C Adder 4.09 MW 3.47 MW
938772 AE1-103 E Adder 5.64 MW 4.8 MW
314507 3THOMPSN Adder 3.27 MW 2.78 MW
314525 6KINGFORK Adder 1.51 MW 1.28 MW
314550 6HICKORY 50/50 3.61 MW 3.61 MW
315092 1YORKTN3 Adder 179.07 MW 152.21 MW
926662 AC1-147 E 50/50 2.14 MW 2.14 MW
926755 AC1-161 E 50/50 24.36 MW 24.36 MW
927226 AC1-216 E Adder 6.77 MW 5.76 MW
935112 AD1-144 E Adder 1.4 MW 1.19 MW
942341 AE2-247 C Adder 1.93 MW 1.64 MW
942342 AE2-247 E Adder 2.66 MW 2.26 MW
943461 AF1-017 C Adder 1.74 MW 1.48 MW
943462 AF1-017 E Adder 2.85 MW 2.42 MW
943612 AF1-032 E Adder 1.44 MW 1.23 MW
315098 1CHESPKA 50/50 0.71 MW 0.71 MW
315099 1CHESPKB 50/50 1.17 MW 1.17 MW
315108 1ELIZAR1 50/50 5.21 MW 5.21 MW
315109 1ELIZAR2 50/50 5.12 MW 5.12 MW
315110 1ELIZAR3 50/50 5.28 MW 5.28 MW
315233 1SURRY 2 50/50 52.02 MW 52.02 MW
315260 1GOSPORTA Adder 3.45 MW 2.93 MW
315261 1GOSPORTB 50/50 4.4 MW 4.4 MW
315262 1GOSPORTC 50/50 3.74 MW 3.74 MW
913392 Y1-086 E Adder 3.5 MW 2.98 MW
916192 Z1-068 E 50/50 3.08 MW 3.08 MW
923832 AB2-022 E Adder 1.98 MW 1.68 MW
923852 AB2-025 E Adder 1.06 MW 0.91 MW
939312 AE1-162 E Adder 1.93 MW 1.64 MW
957492 AF2-043 E Adder 2.22 MW 1.89 MW
962962 AG1-145 E Adder 1.35 MW 1.15 MW
901082 W1-029 E Adder 49.43 MW 42.02 MW
917122 Z2-027 E Adder 2.12 MW 1.8 MW
925522 AC1-027 E 50/50 1.99 MW 1.99 MW
957832 AF2-077 E Adder 1.37 MW 1.16 MW
957871 AF2-081 C 50/50 16.36 MW 16.36 MW
957872 AF2-081 E 50/50 7.01 MW 7.01 MW
958161 AF2-110 C Adder 2.02 MW 1.72 MW
958162 AF2-110 E Adder 3.21 MW 2.73 MW
314722 3TWITTYS Adder 0.92 MW 0.78 MW
917512 Z2-088 E OP1 Adder 5.53 MW 4.7 MW
926071 AC1-086 C Adder 22.83 MW 19.4 MW
926072 AC1-086 E Adder 10.39 MW 8.83 MW
927021 AC1-189 C Adder 9.69 MW 8.24 MW
927022 AC1-189 E Adder 4.83 MW 4.1 MW
933291 AC2-141 C 50/50 57.06 MW 57.06 MW
933292 AC2-141 E 50/50 24.36 MW 24.36 MW
934621 AD1-088 C Adder 13.21 MW 11.23 MW
934622 AD1-088 E Adder 6.22 MW 5.28 MW
939411 AE1-173 C Adder 131.36 MW 111.66 MW
939412 AE1-173 E Adder 87.57 MW 74.44 MW
934012 AD1-025 E Adder 8.77 MW 7.46 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 11.94 MW 10.15 MW
933982 AD1-022 E Adder 6.5 MW 5.53 MW
962572 AG1-106 E Adder 1.29 MW 1.1 MW
961681 AG1-008 C Adder 18.23 MW 15.5 MW
961682 AG1-008 E Adder 9.21 MW 7.83 MW
962571 AG1-106 C Adder 2.95 MW 2.51 MW
314594 6PLYMOUTH TP Adder 0.45 MW 0.38 MW
314632 6AYDLETT TAP 50/50 2.21 MW 2.21 MW
316036 AC1-147 C 50/50 0.6 MW 0.6 MW
316160 AE1-175 E Adder 1.12 MW 0.95 MW
316185 AD1-033 C 50/50 2.04 MW 2.04 MW
316263 AC1-034 C Adder 7.27 MW 6.18 MW
316274 AC1-208 C Adder 11.02 MW 9.36 MW
316294 AC1-161 C 50/50 9.32 MW 9.32 MW
316316 AC1-027 C 50/50 0.52 MW 0.52 MW
917332 KELFORD E Adder 2.09 MW 1.78 MW
924516 AB2-100 E1 Adder 2.92 MW 2.49 MW
924517 AB2-100 E2 Adder 2.92 MW 2.49 MW
925595 AC1-034 E Adder 5.48 MW 4.66 MW
926206 AC1-098 E Adder 4.54 MW 3.85 MW
926214 AC1-099 E Adder 1.5 MW 1.27 MW
934065 AD1-033 E 50/50 8.33 MW 8.33 MW
937226 AE2-253 E 50/50 9.61 MW 9.61 MW
918512 AA1-065 E OP Adder 7.19 MW 6.11 MW
316017 AA1-139 ULT1 50/50 1.77 MW 1.77 MW
316018 AA1-139 ULT2 50/50 1.77 MW 1.77 MW
919153 AA1-139 E2 50/50 6.69 MW 6.69 MW
919152 AA1-139 E1 50/50 6.69 MW 6.69 MW
919710 AA2-057 E Adder 4.97 MW 4.23 MW
920692 AA2-178 E Adder 5.9 MW 5.01 MW
923994 AB2-040_E Adder 6.66 MW 5.66 MW
924022 AB2-043 E O1 Adder 5.21 MW 4.43 MW
924152 AB2-059 E OP Adder 5.75 MW 4.89 MW
924814 AB2-134 E Adder 11.1 MW 9.43 MW
316084 AB2-161 E Adder 5.59 MW 4.75 MW
925122 AB2-169 E Adder 7.45 MW 6.33 MW
316088 AB2-174 E Adder 6.96 MW 5.91 MW
316375 AC2-012 C 50/50 2.19 MW 2.19 MW
932046 AC2-012 E 50/50 21.21 MW 21.21 MW
316311 AC2-079 C Adder 7.55 MW 6.41 MW
932596 AC2-079 E Adder 12.31 MW 10.46 MW
934576 AD1-082 E Adder 4.46 MW 3.79 MW
316349 AD2-085 C Adder 4.45 MW 3.78 MW
936666 AD2-085 E Adder 7.26 MW 6.17 MW
316388 AE2-253 GEN 50/50 3.23 MW 3.23 MW
961611 AG1-000B C Adder 17.46 MW 14.84 MW
941591 AE2-156 C 50/50 29.03 MW 29.03 MW
944581 AF1-123 C 50/50 75.49 MW 75.49 MW
944582 AF1-123 E 50/50 172.86 MW 172.86 MW
944591 AF1-124 C 50/50 75.75 MW 75.75 MW
944592 AF1-124 E 50/50 173.48 MW 173.48 MW
944601 AF1-125 C 50/50 74.32 MW 74.32 MW
944602 AF1-125 E 50/50 170.14 MW 170.14 MW
962491 AG1-098 C Adder 11.72 MW 9.96 MW
962492 AG1-098 E Adder 7.81 MW 6.64 MW
962561 AG1-105 C Adder 8.72 MW 7.41 MW
962562 AG1-105 E Adder 5.81 MW 4.94 MW
964241 AG1-285 C Adder 13.02 MW 11.07 MW
964242 AG1-285 E Adder 8.68 MW 7.38 MW
313764 3SOCKMAN Adder 0.79 MW 0.67 MW
932632 AC2-084 E Adder 4.01 MW 3.41 MW
934321 AD1-056 C Adder 6.74 MW 5.73 MW
934322 AD1-056 E Adder 3.66 MW 3.11 MW
934331 AD1-057 C Adder 3.76 MW 3.2 MW
934332 AD1-057 E Adder 1.96 MW 1.67 MW
934501 AD1-074 C Adder 46.68 MW 39.68 MW
934502 AD1-074 E Adder 23.76 MW 20.2 MW
934511 AD1-075 C Adder 11.67 MW 9.92 MW
934512 AD1-075 E Adder 5.94 MW 5.05 MW
934612 AD1-087 E Adder 3.88 MW 3.3 MW
935172 AD1-152 E Adder 5.7 MW 4.84 MW
937482 AD2-202 E Adder 1.14 MW 0.97 MW
938531 AE1-072 C 50/50 28.63 MW 28.63 MW
938532 AE1-072 E 50/50 14.92 MW 14.92 MW
940481 AE2-033 C Adder 15.03 MW 12.78 MW
940482 AE2-033 E Adder 10.13 MW 8.61 MW
940541 AE2-040 C Adder 2.63 MW 2.24 MW
940641 AE2-051 C Adder 23.99 MW 20.39 MW
940642 AE2-051 E Adder 16.0 MW 13.6 MW
941101 AE2-104 C Adder 4.95 MW 4.2 MW
941102 AE2-104 E Adder 7.86 MW 6.68 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 18.96 MW 18.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 17.43 MW 17.43 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 92.34 MW 92.34 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.05 MW 3.05 MW
NY PJM->LTFIMP_NY CLTF 1.46 MW 1.46 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.77 MW 0.77 MW
WEC LTFEXP_WEC->PJM CLTF 0.4 MW 0.4 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.63 MW 11.63 MW
TVA LTFEXP_TVA->PJM CLTF 4.97 MW 4.97 MW
MEC LTFEXP_MEC->PJM CLTF 2.74 MW 2.74 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.39 MW 6.39 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.16 MW 0.16 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 19.46 MW 19.46 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.54 MW 5.54 MW

Details for 6POCATY-6LANDSTN 230.0 kV Ckt 1 line l/o DVP_P4-2: 2110T2128_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
Contingency Name:
DVP_P4-2: 2110T2128_SRT-A
CONTINGENCY 'DVP_P4-2: 2110T2128_SRT-A'
 OPEN BRANCH FROM BUS 314466 TO BUS 314508 CKT 1   /*6FENTRES     230.0 - 6THRASHER    230.0
 OPEN BRANCH FROM BUS 314480 TO BUS 314508 CKT 1   /*6HUNTSMN     230.0 - 6THRASHER    230.0
 OPEN BRANCH FROM BUS 314480 TO BUS 314537 CKT 1   /*6HUNTSMN     230.0 - 6SUFFOLK     230.0
 OPEN BUS 314480                                   /*6HUNTSMN     230.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 122.56 %
Rating: 830.0 MVA
Rating Type: C
MVA to Mitigate: 1017.27 MVA
MW Contribution: 127.08 MW
Impact of Topology Modeling:
Increase
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
916042 Z1-036 E Adder 9.45 MW 8.04 MW
313526 AB2-022 C 50/50 0.22 MW 0.22 MW
314507 3THOMPSN Adder -2.93 MW -2.49 MW
314550 6HICKORY 50/50 1.84 MW 1.84 MW
913392 Y1-086 E 50/50 1.27 MW 1.27 MW
923832 AB2-022 E 50/50 0.72 MW 0.72 MW
901082 W1-029 E Adder 10.99 MW 9.34 MW
917122 Z2-027 E Adder 0.69 MW 0.59 MW
957871 AF2-081 C 50/50 7.59 MW 7.59 MW
957872 AF2-081 E 50/50 3.25 MW 3.25 MW
314632 6AYDLETT TAP 50/50 0.97 MW 0.97 MW
316185 AD1-033 C 50/50 1.51 MW 1.51 MW
316320 Y1-086 C 50/50 0.13 MW 0.13 MW
934065 AD1-033 E 50/50 6.15 MW 6.15 MW
937226 AE2-253 E 50/50 4.63 MW 4.63 MW
316017 AA1-139 ULT1 50/50 0.82 MW 0.82 MW
316018 AA1-139 ULT2 50/50 0.82 MW 0.82 MW
919153 AA1-139 E2 50/50 3.1 MW 3.1 MW
919152 AA1-139 E1 50/50 3.1 MW 3.1 MW
316388 AE2-253 GEN 50/50 1.56 MW 1.56 MW
944581 AF1-123 C 50/50 39.24 MW 39.24 MW
944582 AF1-123 E 50/50 89.86 MW 89.86 MW
944591 AF1-124 C 50/50 39.38 MW 39.38 MW
944592 AF1-124 E 50/50 90.18 MW 90.18 MW
944601 AF1-125 C 50/50 38.63 MW 38.63 MW
944602 AF1-125 E 50/50 88.44 MW 88.44 MW
938531 AE1-072 C 50/50 12.76 MW 12.76 MW
938532 AE1-072 E 50/50 6.65 MW 6.65 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.03 MW 0.03 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 2.25 MW 2.25 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.16 MW 1.16 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 3.81 MW 3.81 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.03 MW 0.03 MW
VTF LTFEXP_VFT->PJM CMTX 0.09 MW 0.09 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.08 MW 0.08 MW
WEC LTFEXP_WEC->PJM CLTF 0.04 MW 0.04 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.47 MW 0.47 MW
TVA LTFEXP_TVA->PJM CLTF 0.28 MW 0.28 MW
MEC LTFEXP_MEC->PJM CLTF 0.24 MW 0.24 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.36 MW 0.36 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.23 MW 0.23 MW

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P4-2: 224022-1_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
DVP_P4-2: 224022-1_SRT-S
CONTINGENCY 'DVP_P4-2: 224022-1_SRT-S'
 OPEN BRANCH FROM BUS 314466 TO BUS 314909 CKT 1                /*6FENTRES     230.0 - 8FENTRES     500.0
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1                /*6FENTRES     230.0 - 6POCATY      230.0
 OPEN BUS 314655                                                /*6FENTR_2     230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 145.63 %
Rating: 830.0 MVA
Rating Type: C
MVA to Mitigate: 1208.75 MVA
MW Contribution: 221.69 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
916042 Z1-036 E Adder 10.52 MW 8.94 MW
313526 AB2-022 C 50/50 0.33 MW 0.33 MW
314507 3THOMPSN Adder -2.57 MW -2.19 MW
314550 6HICKORY 50/50 3.18 MW 3.18 MW
913392 Y1-086 E 50/50 1.95 MW 1.95 MW
923832 AB2-022 E 50/50 1.1 MW 1.1 MW
901082 W1-029 E Adder 11.66 MW 9.91 MW
917122 Z2-027 E 50/50 0.99 MW 0.99 MW
957871 AF2-081 C 50/50 12.76 MW 12.76 MW
957872 AF2-081 E 50/50 5.47 MW 5.47 MW
314632 6AYDLETT TAP 50/50 1.59 MW 1.59 MW
316320 Y1-086 C 50/50 0.2 MW 0.2 MW
316321 Z2-027 C 50/50 0.27 MW 0.27 MW
937226 AE2-253 E 50/50 7.87 MW 7.87 MW
316017 AA1-139 ULT1 50/50 1.38 MW 1.38 MW
316018 AA1-139 ULT2 50/50 1.38 MW 1.38 MW
919153 AA1-139 E2 50/50 5.22 MW 5.22 MW
919152 AA1-139 E1 50/50 5.22 MW 5.22 MW
316388 AE2-253 GEN 50/50 2.65 MW 2.65 MW
944581 AF1-123 C 50/50 68.45 MW 68.45 MW
944582 AF1-123 E 50/50 156.75 MW 156.75 MW
944591 AF1-124 C 50/50 68.7 MW 68.7 MW
944592 AF1-124 E 50/50 157.32 MW 157.32 MW
944601 AF1-125 C 50/50 67.4 MW 67.4 MW
944602 AF1-125 E 50/50 154.29 MW 154.29 MW
938531 AE1-072 C 50/50 21.15 MW 21.15 MW
938532 AE1-072 E 50/50 11.02 MW 11.02 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.08 MW 0.08 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.92 MW 1.92 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.88 MW 0.88 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 2.25 MW 2.25 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.13 MW 0.13 MW
VTF LTFEXP_VFT->PJM CMTX 0.35 MW 0.35 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.07 MW 0.07 MW
WEC LTFEXP_WEC->PJM CLTF 0.04 MW 0.04 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.24 MW 0.24 MW
TVA LTFEXP_TVA->PJM CLTF 0.21 MW 0.21 MW
MEC LTFEXP_MEC->PJM CLTF 0.19 MW 0.19 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.26 MW 0.26 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.12 MW 0.12 MW

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P4-2: 224022-2_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
DVP_P4-2: 224022-2_SRT-S
CONTINGENCY 'DVP_P4-2: 224022-2_SRT-S'
 OPEN BRANCH FROM BUS 314466 TO BUS 314909 CKT 2                /*6FENTRES     230.0 - 8FENTRES     500.0
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1                /*6FENTRES     230.0 - 6POCATY      230.0
 OPEN BUS 313889                                                /*6FENTRES_STC 230.0
 OPEN BUS 314654                                                /*6FENTR_1     230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 145.47 %
Rating: 830.0 MVA
Rating Type: C
MVA to Mitigate: 1207.43 MVA
MW Contribution: 221.48 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
916042 Z1-036 E Adder 10.5 MW 8.93 MW
313526 AB2-022 C 50/50 0.33 MW 0.33 MW
314507 3THOMPSN Adder -2.57 MW -2.19 MW
314550 6HICKORY 50/50 3.18 MW 3.18 MW
913392 Y1-086 E 50/50 1.95 MW 1.95 MW
923832 AB2-022 E 50/50 1.1 MW 1.1 MW
901082 W1-029 E Adder 11.64 MW 9.89 MW
917122 Z2-027 E 50/50 0.99 MW 0.99 MW
957871 AF2-081 C 50/50 12.75 MW 12.75 MW
957872 AF2-081 E 50/50 5.46 MW 5.46 MW
314632 6AYDLETT TAP 50/50 1.59 MW 1.59 MW
316320 Y1-086 C 50/50 0.2 MW 0.2 MW
316321 Z2-027 C 50/50 0.27 MW 0.27 MW
937226 AE2-253 E 50/50 7.86 MW 7.86 MW
316017 AA1-139 ULT1 50/50 1.38 MW 1.38 MW
316018 AA1-139 ULT2 50/50 1.38 MW 1.38 MW
919153 AA1-139 E2 50/50 5.21 MW 5.21 MW
919152 AA1-139 E1 50/50 5.21 MW 5.21 MW
316388 AE2-253 GEN 50/50 2.64 MW 2.64 MW
944581 AF1-123 C 50/50 68.39 MW 68.39 MW
944582 AF1-123 E 50/50 156.6 MW 156.6 MW
944591 AF1-124 C 50/50 68.63 MW 68.63 MW
944592 AF1-124 E 50/50 157.17 MW 157.17 MW
944601 AF1-125 C 50/50 67.34 MW 67.34 MW
944602 AF1-125 E 50/50 154.15 MW 154.15 MW
938531 AE1-072 C 50/50 21.13 MW 21.13 MW
938532 AE1-072 E 50/50 11.01 MW 11.01 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.08 MW 0.08 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.92 MW 1.92 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.88 MW 0.88 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 2.24 MW 2.24 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.13 MW 0.13 MW
VTF LTFEXP_VFT->PJM CMTX 0.35 MW 0.35 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.07 MW 0.07 MW
WEC LTFEXP_WEC->PJM CLTF 0.04 MW 0.04 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.24 MW 0.24 MW
TVA LTFEXP_TVA->PJM CLTF 0.21 MW 0.21 MW
MEC LTFEXP_MEC->PJM CLTF 0.19 MW 0.19 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.26 MW 0.26 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.12 MW 0.12 MW

Details for 6POCATY-6LANDSTN 230.0 kV Ckt 1 line l/o DVP_P4-2: 212822_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
Contingency Name:
DVP_P4-2: 212822_SRT-S
CONTINGENCY 'DVP_P4-2: 212822_SRT-S'
 OPEN BRANCH FROM BUS 314466 TO BUS 314508 CKT 1                /*6FENTRES     230.0 - 6THRASHER    230.0
 OPEN BRANCH FROM BUS 314466 TO BUS 314909 CKT 1                /*6FENTRES     230.0 - 8FENTRES     500.0
 OPEN BUS 314655                                                /*6FENTR_2     230.0
 SET POSTCONTRATING 1166 BRANCH FROM BUS 314480 TO BUS 314508 CKT 1 /*6HUNTSMN     230.0 - 6THRASHER    230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
 SET PRECONTRATING 1051 BRANCH FROM BUS 314480 TO BUS 314508 CKT 1 /*6HUNTSMN     230.0 - 6THRASHER    230.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314909 TO BUS 314927 CKT 1 /*8FENTRES     500.0 - 8YADKIN      500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 120.03 %
Rating: 830.0 MVA
Rating Type: C
MVA to Mitigate: 996.28 MVA
MW Contribution: 157.11 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
313526 AB2-022 C 50/50 0.24 MW 0.24 MW
314507 3THOMPSN Adder -2.38 MW -2.02 MW
314550 6HICKORY 50/50 2.26 MW 2.26 MW
913392 Y1-086 E 50/50 1.41 MW 1.41 MW
923832 AB2-022 E 50/50 0.79 MW 0.79 MW
917122 Z2-027 E Adder 0.72 MW 0.62 MW
957871 AF2-081 C 50/50 9.09 MW 9.09 MW
957872 AF2-081 E 50/50 3.9 MW 3.9 MW
314632 6AYDLETT TAP 50/50 1.14 MW 1.14 MW
316185 AD1-033 C 50/50 1.78 MW 1.78 MW
316320 Y1-086 C 50/50 0.14 MW 0.14 MW
934065 AD1-033 E 50/50 7.27 MW 7.27 MW
937226 AE2-253 E 50/50 5.6 MW 5.6 MW
316017 AA1-139 ULT1 50/50 0.98 MW 0.98 MW
316018 AA1-139 ULT2 50/50 0.98 MW 0.98 MW
919153 AA1-139 E2 50/50 3.72 MW 3.72 MW
919152 AA1-139 E1 50/50 3.72 MW 3.72 MW
316388 AE2-253 GEN 50/50 1.88 MW 1.88 MW
944581 AF1-123 C 50/50 48.51 MW 48.51 MW
944582 AF1-123 E 50/50 111.09 MW 111.09 MW
944591 AF1-124 C 50/50 48.68 MW 48.68 MW
944592 AF1-124 E 50/50 111.49 MW 111.49 MW
944601 AF1-125 C 50/50 47.76 MW 47.76 MW
944602 AF1-125 E 50/50 109.34 MW 109.34 MW
938531 AE1-072 C 50/50 15.1 MW 15.1 MW
938532 AE1-072 E 50/50 7.87 MW 7.87 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.04 MW 0.04 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.43 MW 1.43 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.69 MW 0.69 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 1.95 MW 1.95 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.07 MW 0.07 MW
VTF LTFEXP_VFT->PJM CMTX 0.18 MW 0.18 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.05 MW 0.05 MW
WEC LTFEXP_WEC->PJM CLTF 0.03 MW 0.03 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.22 MW 0.22 MW
TVA LTFEXP_TVA->PJM CLTF 0.16 MW 0.16 MW
MEC LTFEXP_MEC->PJM CLTF 0.15 MW 0.15 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.21 MW 0.21 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.11 MW 0.11 MW

Details for 6POCATY-6LANDSTN 230.0 kV Ckt 1 line l/o DVP_P4-2: 269T2128_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
Contingency Name:
DVP_P4-2: 269T2128_SRT-S
CONTINGENCY 'DVP_P4-2: 269T2128_SRT-S'
 OPEN BRANCH FROM BUS 314466 TO BUS 314508 CKT 1                /*6FENTRES     230.0 - 6THRASHER    230.0
 OPEN BRANCH FROM BUS 314466 TO BUS 314645 CKT 1                /*6FENTRES     230.0 - 6SLIGO L269  230.0
 OPEN BRANCH FROM BUS 314645 TO BUS 938530 CKT 1                /*6SLIGO L269  230.0 - AE1-072 TP   230.0
 SET POSTCONTRATING 1166 BRANCH FROM BUS 314480 TO BUS 314508 CKT 1 /*6HUNTSMN     230.0 - 6THRASHER    230.0
 SET PRECONTRATING 1051 BRANCH FROM BUS 314480 TO BUS 314508 CKT 1 /*6HUNTSMN     230.0 - 6THRASHER    230.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 116.73 %
Rating: 830.0 MVA
Rating Type: C
MVA to Mitigate: 968.83 MVA
MW Contribution: 147.84 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314507 3THOMPSN Adder -2.4 MW -2.04 MW
314550 6HICKORY 50/50 2.06 MW 2.06 MW
913392 Y1-086 E Adder 1.04 MW 0.89 MW
923832 AB2-022 E Adder 0.59 MW 0.5 MW
917122 Z2-027 E Adder 0.53 MW 0.45 MW
957871 AF2-081 C 50/50 7.46 MW 7.46 MW
957872 AF2-081 E 50/50 3.2 MW 3.2 MW
314632 6AYDLETT TAP 50/50 0.86 MW 0.86 MW
316185 AD1-033 C 50/50 1.71 MW 1.71 MW
934065 AD1-033 E 50/50 6.98 MW 6.98 MW
937226 AE2-253 E 50/50 4.81 MW 4.81 MW
316017 AA1-139 ULT1 50/50 0.81 MW 0.81 MW
316018 AA1-139 ULT2 50/50 0.81 MW 0.81 MW
919153 AA1-139 E2 50/50 3.05 MW 3.05 MW
919152 AA1-139 E1 50/50 3.05 MW 3.05 MW
316388 AE2-253 GEN 50/50 1.62 MW 1.62 MW
944581 AF1-123 C 50/50 45.65 MW 45.65 MW
944582 AF1-123 E 50/50 104.53 MW 104.53 MW
944591 AF1-124 C 50/50 45.81 MW 45.81 MW
944592 AF1-124 E 50/50 104.91 MW 104.91 MW
944601 AF1-125 C 50/50 44.95 MW 44.95 MW
944602 AF1-125 E 50/50 102.89 MW 102.89 MW
938531 AE1-072 C 50/50 11.16 MW 11.16 MW
938532 AE1-072 E 50/50 5.82 MW 5.82 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.06 MW 0.06 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.35 MW 1.35 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.61 MW 0.61 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 1.5 MW 1.5 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.1 MW 0.1 MW
VTF LTFEXP_VFT->PJM CMTX 0.27 MW 0.27 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.05 MW 0.05 MW
WEC LTFEXP_WEC->PJM CLTF 0.03 MW 0.03 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.16 MW 0.16 MW
TVA LTFEXP_TVA->PJM CLTF 0.14 MW 0.14 MW
MEC LTFEXP_MEC->PJM CLTF 0.14 MW 0.14 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.18 MW 0.18 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.07 MW 0.07 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P4-2: H1T567_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Contingency Name:
DVP_P4-2: H1T567_SRT-A
CONTINGENCY 'DVP_P4-2: H1T567_SRT-A'
 OPEN BRANCH FROM BUS 314214 TO BUS 314903 CKT 1   /*6CHCKAHM     230.0 - 8CHCKAHM     500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 105.01 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4137.47 MVA
MW Contribution: 230.98 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.74 MW 0.63 MW
961942 AG1-037 E Adder 0.5 MW 0.42 MW
962331 AG1-082 C Adder 2.98 MW 2.53 MW
962332 AG1-082 E Adder 1.99 MW 1.69 MW
963041 AG1-153 C 50/50 9.97 MW 9.97 MW
963042 AG1-153 E 50/50 14.95 MW 14.95 MW
964791 AG1-342 C Adder 4.84 MW 4.12 MW
964792 AG1-342 E Adder 3.23 MW 2.74 MW
966801 AG1-551 C Adder 3.04 MW 2.59 MW
966802 AG1-551 E Adder 1.6 MW 1.36 MW
966811 AG1-552 C Adder 2.99 MW 2.54 MW
966812 AG1-552 E Adder 1.42 MW 1.21 MW
965291 AG1-394 C Adder 1.26 MW 1.07 MW
965292 AG1-394 E Adder 2.32 MW 1.97 MW
966621 AG1-532 C Adder 2.01 MW 1.71 MW
966622 AG1-532 E Adder 1.34 MW 1.14 MW
314541 3WATKINS Adder 1.02 MW 0.87 MW
314572 3EMPORIA Adder 0.62 MW 0.53 MW
918492 AA1-063AE OP Adder 5.97 MW 5.07 MW
918532 AA1-067 E Adder 1.03 MW 0.87 MW
919692 AA2-053 E OP Adder 6.16 MW 5.24 MW
920042 AA2-088 E OP Adder 15.64 MW 13.3 MW
925785 AC1-054 E Adder 4.92 MW 4.18 MW
926274 AC1-105 E Adder 3.64 MW 3.1 MW
927146 AC1-208 E Adder 6.05 MW 5.14 MW
934521 AD1-076 C Adder 18.29 MW 15.54 MW
934522 AD1-076 E Adder 9.32 MW 7.92 MW
943172 AE2-346 E Adder 0.89 MW 0.76 MW
944011 AF1-069 C 50/50 23.47 MW 23.47 MW
944012 AF1-069 E 50/50 9.12 MW 9.12 MW
960081 AF2-299 C Adder 2.69 MW 2.28 MW
960082 AF2-299 E Adder 1.79 MW 1.52 MW
316141 AB2-099 E Adder 0.37 MW 0.32 MW
900672 V4-068 E Adder 0.53 MW 0.45 MW
917342 Z2-044 E Adder 0.94 MW 0.8 MW
923263 AB1-132 E OP Adder 8.78 MW 7.46 MW
923573 AB1-173 E OP Adder 4.74 MW 4.03 MW
924162 AB2-060 E OP Adder 5.93 MW 5.04 MW
924302 AB2-077 E O1 Adder 1.87 MW 1.59 MW
924312 AB2-078 E O1 Adder 1.87 MW 1.59 MW
924322 AB2-079 E O1 Adder 1.87 MW 1.59 MW
925612 AC1-036 E Adder 1.15 MW 0.97 MW
939181 AE1-148 C Adder 12.7 MW 10.79 MW
939182 AE1-148 E Adder 8.47 MW 7.2 MW
940492 AE2-034 E Adder 4.64 MW 3.95 MW
941031 AE2-094 C 50/50 71.84 MW 71.84 MW
941032 AE2-094 E 50/50 32.18 MW 32.18 MW
946281 AF1-292 C Adder 2.22 MW 1.89 MW
946282 AF1-292 E Adder 1.48 MW 1.26 MW
957481 AF2-042 C 50/50 85.03 MW 85.03 MW
957482 AF2-042 E 50/50 56.68 MW 56.68 MW
957521 AF2-046 C Adder 20.93 MW 17.79 MW
957522 AF2-046 E Adder 10.58 MW 8.99 MW
957861 AF2-080 C Adder 10.85 MW 9.22 MW
957862 AF2-080 E Adder 4.81 MW 4.09 MW
314539 3UNCAMP Adder 9.02 MW 7.67 MW
916042 Z1-036 E Adder 43.5 MW 36.98 MW
938771 AE1-103 C Adder 4.35 MW 3.69 MW
938772 AE1-103 E Adder 6.0 MW 5.1 MW
314507 3THOMPSN Adder 3.11 MW 2.64 MW
314525 6KINGFORK Adder 1.48 MW 1.26 MW
314550 6HICKORY 50/50 3.42 MW 3.42 MW
315092 1YORKTN3 Adder 100.08 MW 85.07 MW
926662 AC1-147 E Adder 2.04 MW 1.73 MW
926755 AC1-161 E 50/50 21.29 MW 21.29 MW
935112 AD1-144 E Adder 1.37 MW 1.17 MW
942341 AE2-247 C Adder 2.08 MW 1.77 MW
942342 AE2-247 E Adder 2.87 MW 2.44 MW
943461 AF1-017 C Adder 1.88 MW 1.6 MW
943462 AF1-017 E Adder 3.07 MW 2.61 MW
943612 AF1-032 E Adder 1.41 MW 1.2 MW
315102 1BRUNSWICKG1 50/50 14.71 MW 14.71 MW
315103 1BRUNSWICKG2 50/50 14.71 MW 14.71 MW
315104 1BRUNSWICKG3 50/50 14.71 MW 14.71 MW
315105 1BRUNSWICKS1 50/50 30.56 MW 30.56 MW
315108 1ELIZAR1 50/50 4.94 MW 4.94 MW
315109 1ELIZAR2 50/50 4.86 MW 4.86 MW
315110 1ELIZAR3 50/50 5.01 MW 5.01 MW
315233 1SURRY 2 50/50 38.77 MW 38.77 MW
315241 1Z1-086 GT1 50/50 18.86 MW 18.86 MW
315242 1Z1-086 GT2 50/50 18.85 MW 18.85 MW
315243 1Z1-086 GT3 50/50 18.85 MW 18.85 MW
315244 1Z1-086 ST 50/50 32.82 MW 32.82 MW
315260 1GOSPORTA 50/50 3.28 MW 3.28 MW
315261 1GOSPORTB 50/50 4.18 MW 4.18 MW
315262 1GOSPORTC 50/50 3.55 MW 3.55 MW
913392 Y1-086 E Adder 3.4 MW 2.89 MW
916192 Z1-068 E 50/50 2.92 MW 2.92 MW
923832 AB2-022 E Adder 1.92 MW 1.63 MW
923852 AB2-025 E Adder 1.68 MW 1.42 MW
939312 AE1-162 E Adder 1.91 MW 1.63 MW
957492 AF2-043 E Adder 2.17 MW 1.85 MW
901082 W1-029 E Adder 48.89 MW 41.55 MW
917122 Z2-027 E Adder 2.07 MW 1.76 MW
925522 AC1-027 E 50/50 1.89 MW 1.89 MW
957871 AF2-081 C 50/50 15.62 MW 15.62 MW
957872 AF2-081 E 50/50 6.69 MW 6.69 MW
958161 AF2-110 C Adder 2.04 MW 1.73 MW
958162 AF2-110 E Adder 3.24 MW 2.76 MW
314722 3TWITTYS Adder 1.27 MW 1.08 MW
917512 Z2-088 E OP1 Adder 6.92 MW 5.88 MW
926071 AC1-086 C Adder 30.16 MW 25.64 MW
926072 AC1-086 E Adder 13.73 MW 11.67 MW
927021 AC1-189 C Adder 11.95 MW 10.15 MW
927022 AC1-189 E Adder 5.95 MW 5.06 MW
933291 AC2-141 C 50/50 49.88 MW 49.88 MW
933292 AC2-141 E 50/50 21.29 MW 21.29 MW
934621 AD1-088 C Adder 18.6 MW 15.81 MW
934622 AD1-088 E Adder 8.76 MW 7.44 MW
939411 AE1-173 C 50/50 159.01 MW 159.01 MW
939412 AE1-173 E 50/50 106.0 MW 106.0 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 13.05 MW 11.09 MW
933982 AD1-022 E Adder 7.1 MW 6.04 MW
962572 AG1-106 E Adder 1.71 MW 1.45 MW
961681 AG1-008 C Adder 20.93 MW 17.79 MW
961682 AG1-008 E Adder 10.58 MW 8.99 MW
962571 AG1-106 C Adder 3.9 MW 3.32 MW
314594 6PLYMOUTH TP Adder 0.48 MW 0.41 MW
314632 6AYDLETT TAP 50/50 2.11 MW 2.11 MW
316185 AD1-033 C 50/50 1.93 MW 1.93 MW
316274 AC1-208 C Adder 13.62 MW 11.58 MW
316294 AC1-161 C 50/50 8.15 MW 8.15 MW
316316 AC1-027 C 50/50 0.49 MW 0.49 MW
917332 KELFORD E Adder 2.45 MW 2.08 MW
924516 AB2-100 E1 Adder 4.16 MW 3.54 MW
924517 AB2-100 E2 Adder 4.16 MW 3.54 MW
926206 AC1-098 E Adder 5.52 MW 4.69 MW
926214 AC1-099 E Adder 1.82 MW 1.55 MW
934065 AD1-033 E 50/50 7.87 MW 7.87 MW
937226 AE2-253 E 50/50 9.15 MW 9.15 MW
918512 AA1-065 E OP Adder 8.15 MW 6.93 MW
316017 AA1-139 ULT1 50/50 1.69 MW 1.69 MW
316018 AA1-139 ULT2 50/50 1.69 MW 1.69 MW
919153 AA1-139 E2 50/50 6.39 MW 6.39 MW
919152 AA1-139 E1 50/50 6.39 MW 6.39 MW
919710 AA2-057 E Adder 6.12 MW 5.21 MW
920692 AA2-178 E Adder 6.19 MW 5.26 MW
923994 AB2-040_E Adder 8.89 MW 7.56 MW
924022 AB2-043 E O1 Adder 7.24 MW 6.15 MW
316084 AB2-161 E Adder 6.88 MW 5.85 MW
925122 AB2-169 E Adder 8.43 MW 7.17 MW
316088 AB2-174 E Adder 9.4 MW 7.99 MW
932046 AC2-012 E Adder 20.16 MW 17.13 MW
316311 AC2-079 C Adder 8.06 MW 6.85 MW
932596 AC2-079 E Adder 13.16 MW 11.18 MW
934576 AD1-082 E Adder 5.48 MW 4.66 MW
316349 AD2-085 C Adder 4.8 MW 4.08 MW
936666 AD2-085 E Adder 7.83 MW 6.65 MW
316388 AE2-253 GEN 50/50 3.08 MW 3.08 MW
941591 AE2-156 C 50/50 27.57 MW 27.57 MW
944581 AF1-123 C 50/50 71.32 MW 71.32 MW
944582 AF1-123 E 50/50 163.32 MW 163.32 MW
944591 AF1-124 C 50/50 71.58 MW 71.58 MW
944592 AF1-124 E 50/50 163.91 MW 163.91 MW
944601 AF1-125 C 50/50 70.22 MW 70.22 MW
944602 AF1-125 E 50/50 160.75 MW 160.75 MW
962491 AG1-098 C Adder 16.49 MW 14.02 MW
962492 AG1-098 E Adder 10.99 MW 9.34 MW
962561 AG1-105 C Adder 12.18 MW 10.36 MW
962562 AG1-105 E Adder 8.12 MW 6.91 MW
964241 AG1-285 C Adder 18.2 MW 15.47 MW
964242 AG1-285 E Adder 12.14 MW 10.31 MW
313764 3SOCKMAN Adder 1.03 MW 0.88 MW
932632 AC2-084 E Adder 4.88 MW 4.14 MW
934321 AD1-056 C Adder 8.83 MW 7.51 MW
934322 AD1-056 E Adder 4.79 MW 4.07 MW
934331 AD1-057 C Adder 4.93 MW 4.19 MW
934332 AD1-057 E Adder 2.57 MW 2.18 MW
934501 AD1-074 C Adder 50.35 MW 42.8 MW
934502 AD1-074 E Adder 25.63 MW 21.79 MW
934511 AD1-075 C Adder 12.59 MW 10.7 MW
934512 AD1-075 E Adder 6.41 MW 5.45 MW
934612 AD1-087 E Adder 5.5 MW 4.67 MW
935172 AD1-152 E Adder 8.05 MW 6.84 MW
937482 AD2-202 E Adder 1.61 MW 1.37 MW
938531 AE1-072 C 50/50 27.42 MW 27.42 MW
938532 AE1-072 E 50/50 14.29 MW 14.29 MW
940481 AE2-033 C Adder 23.34 MW 19.84 MW
940482 AE2-033 E Adder 15.74 MW 13.38 MW
940541 AE2-040 C Adder 4.14 MW 3.52 MW
940641 AE2-051 C 50/50 31.36 MW 31.36 MW
940642 AE2-051 E 50/50 20.91 MW 20.91 MW
941101 AE2-104 C Adder 5.0 MW 4.25 MW
941102 AE2-104 E Adder 7.94 MW 6.75 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 32.86 MW 32.86 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 26.58 MW 26.58 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 129.49 MW 129.49 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.3 MW 4.3 MW
NY PJM->LTFIMP_NY CLTF 2.02 MW 2.02 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.3 MW 1.3 MW
WEC LTFEXP_WEC->PJM CLTF 0.69 MW 0.69 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.03 MW 16.03 MW
TVA LTFEXP_TVA->PJM CLTF 7.39 MW 7.39 MW
MEC LTFEXP_MEC->PJM CLTF 4.41 MW 4.41 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.47 MW 9.47 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.27 MW 0.27 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 27.38 MW 27.38 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.64 MW 7.64 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P4-2: H2T574_SRT-S_SENS


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Contingency Name:
DVP_P4-2: H2T574_SRT-S_SENS
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S_SENS'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 313483 CKT 1 /*8LADYSMITH   500.0 - 8KRAKEN      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 313483 CKT 1 /*8LADYSMITH   500.0 - 8KRAKEN      500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 103.76 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4088.29 MVA
MW Contribution: 219.82 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.74 MW 0.62 MW
961942 AG1-037 E Adder 0.49 MW 0.42 MW
962331 AG1-082 C Adder 2.94 MW 2.5 MW
962332 AG1-082 E Adder 1.96 MW 1.67 MW
963041 AG1-153 C 50/50 8.86 MW 8.86 MW
963042 AG1-153 E 50/50 13.3 MW 13.3 MW
966811 AG1-552 C Adder 2.99 MW 2.54 MW
966812 AG1-552 E Adder 1.42 MW 1.21 MW
965291 AG1-394 C Adder 1.25 MW 1.06 MW
965292 AG1-394 E Adder 2.31 MW 1.96 MW
966621 AG1-532 C Adder 2.05 MW 1.74 MW
966622 AG1-532 E Adder 1.37 MW 1.16 MW
314541 3WATKINS Adder 1.02 MW 0.87 MW
314572 3EMPORIA Adder 0.63 MW 0.54 MW
918492 AA1-063AE OP Adder 5.96 MW 5.07 MW
919692 AA2-053 E OP Adder 6.15 MW 5.23 MW
920042 AA2-088 E OP Adder 15.57 MW 13.24 MW
927146 AC1-208 E Adder 6.02 MW 5.12 MW
934521 AD1-076 C Adder 17.83 MW 15.15 MW
934522 AD1-076 E Adder 9.09 MW 7.72 MW
943172 AE2-346 E Adder 0.88 MW 0.75 MW
944011 AF1-069 C 50/50 20.73 MW 20.73 MW
944012 AF1-069 E 50/50 8.05 MW 8.05 MW
960081 AF2-299 C Adder 2.73 MW 2.32 MW
960082 AF2-299 E Adder 1.82 MW 1.55 MW
316141 AB2-099 E Adder 0.37 MW 0.31 MW
900672 V4-068 E Adder 0.52 MW 0.44 MW
917342 Z2-044 E Adder 0.93 MW 0.79 MW
923573 AB1-173 E OP Adder 4.79 MW 4.07 MW
940492 AE2-034 E Adder 4.52 MW 3.84 MW
941031 AE2-094 C 50/50 63.46 MW 63.46 MW
941032 AE2-094 E 50/50 28.42 MW 28.42 MW
946281 AF1-292 C Adder 2.26 MW 1.92 MW
946282 AF1-292 E Adder 1.51 MW 1.28 MW
957481 AF2-042 C 50/50 80.53 MW 80.53 MW
957482 AF2-042 E 50/50 53.69 MW 53.69 MW
957521 AF2-046 C Adder 20.75 MW 17.64 MW
957522 AF2-046 E Adder 10.48 MW 8.91 MW
314539 3UNCAMP Adder 8.98 MW 7.63 MW
916042 Z1-036 E Adder 42.14 MW 35.82 MW
938771 AE1-103 C Adder 4.33 MW 3.68 MW
938772 AE1-103 E Adder 5.98 MW 5.08 MW
933502 AC2-165 E Adder 10.55 MW 8.97 MW
314331 6POE 50/50 2.02 MW 2.02 MW
314507 3THOMPSN Adder 3.01 MW 2.56 MW
314525 6KINGFORK Adder 1.49 MW 1.27 MW
314550 6HICKORY 50/50 3.26 MW 3.26 MW
315065 1CHESTF6 Adder 26.83 MW 22.8 MW
315083 1SPRUNCA Adder 12.83 MW 10.9 MW
315084 1SPRUNCB Adder 12.83 MW 10.9 MW
926662 AC1-147 E Adder 1.97 MW 1.68 MW
926755 AC1-161 E 50/50 19.42 MW 19.42 MW
927226 AC1-216 E Adder 10.71 MW 9.1 MW
935112 AD1-144 E Adder 1.38 MW 1.18 MW
942341 AE2-247 C Adder 2.2 MW 1.87 MW
942342 AE2-247 E Adder 3.04 MW 2.59 MW
943461 AF1-017 C Adder 1.99 MW 1.69 MW
943462 AF1-017 E Adder 3.25 MW 2.76 MW
943612 AF1-032 E Adder 1.37 MW 1.17 MW
958502 AF2-144 E Adder 1.79 MW 1.52 MW
315102 1BRUNSWICKG1 50/50 13.08 MW 13.08 MW
315103 1BRUNSWICKG2 50/50 13.08 MW 13.08 MW
315104 1BRUNSWICKG3 50/50 13.08 MW 13.08 MW
315105 1BRUNSWICKS1 50/50 27.18 MW 27.18 MW
315108 1ELIZAR1 50/50 4.77 MW 4.77 MW
315109 1ELIZAR2 50/50 4.69 MW 4.69 MW
315110 1ELIZAR3 50/50 4.84 MW 4.84 MW
315241 1Z1-086 GT1 50/50 16.73 MW 16.73 MW
315242 1Z1-086 GT2 50/50 16.73 MW 16.73 MW
315243 1Z1-086 GT3 50/50 16.73 MW 16.73 MW
315244 1Z1-086 ST 50/50 29.13 MW 29.13 MW
315260 1GOSPORTA Adder 3.17 MW 2.7 MW
315261 1GOSPORTB Adder 4.06 MW 3.45 MW
315262 1GOSPORTC Adder 3.44 MW 2.92 MW
913392 Y1-086 E Adder 3.27 MW 2.78 MW
916192 Z1-068 E 50/50 2.81 MW 2.81 MW
923832 AB2-022 E Adder 1.84 MW 1.57 MW
923852 AB2-025 E 50/50 1.74 MW 1.74 MW
923862 AB2-026 E Adder 1.82 MW 1.54 MW
938552 AE1-074 E 50/50 1.96 MW 1.96 MW
938562 AE1-075 E Adder 1.55 MW 1.32 MW
939312 AE1-162 E Adder 2.07 MW 1.76 MW
946262 AF1-291 E Adder 1.99 MW 1.69 MW
957492 AF2-043 E Adder 2.11 MW 1.8 MW
901082 W1-029 E Adder 47.26 MW 40.17 MW
917122 Z2-027 E Adder 2.0 MW 1.7 MW
925332 AB2-190 E Adder 11.07 MW 9.41 MW
925522 AC1-027 E 50/50 1.82 MW 1.82 MW
942001 AE2-212 C Adder 3.08 MW 2.61 MW
942002 AE2-212 E Adder 2.05 MW 1.74 MW
957871 AF2-081 C Adder 14.92 MW 12.68 MW
957872 AF2-081 E Adder 6.39 MW 5.43 MW
958161 AF2-110 C Adder 2.03 MW 1.73 MW
958162 AF2-110 E Adder 3.23 MW 2.74 MW
933291 AC2-141 C 50/50 45.5 MW 45.5 MW
933292 AC2-141 E 50/50 19.42 MW 19.42 MW
934621 AD1-088 C Adder 18.44 MW 15.67 MW
934622 AD1-088 E Adder 8.68 MW 7.37 MW
939411 AE1-173 C 50/50 142.87 MW 142.87 MW
939412 AE1-173 E 50/50 95.25 MW 95.25 MW
934012 AD1-025 E Adder 13.86 MW 11.78 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 12.74 MW 10.83 MW
933982 AD1-022 E Adder 6.94 MW 5.9 MW
961681 AG1-008 C Adder 20.75 MW 17.64 MW
961682 AG1-008 E Adder 10.48 MW 8.91 MW
314594 6PLYMOUTH TP Adder 0.47 MW 0.4 MW
314632 6AYDLETT TAP Adder 2.02 MW 1.72 MW
316185 AD1-033 C 50/50 1.84 MW 1.84 MW
316233 AE1-074 C 50/50 3.89 MW 3.89 MW
316240 AF1-291 C Adder 2.98 MW 2.53 MW
316274 AC1-208 C Adder 13.57 MW 11.53 MW
316294 AC1-161 C 50/50 7.43 MW 7.43 MW
316315 AB2-025 C 50/50 0.61 MW 0.61 MW
316316 AC1-027 C 50/50 0.47 MW 0.47 MW
316336 AC2-165 C Adder 14.02 MW 11.92 MW
924516 AB2-100 E1 Adder 4.25 MW 3.61 MW
924517 AB2-100 E2 Adder 4.25 MW 3.61 MW
926206 AC1-098 E Adder 5.48 MW 4.66 MW
934065 AD1-033 E 50/50 7.5 MW 7.5 MW
937226 AE2-253 E 50/50 8.72 MW 8.72 MW
919153 AA1-139 E2 Adder 6.1 MW 5.18 MW
919152 AA1-139 E1 Adder 6.1 MW 5.18 MW
919710 AA2-057 E Adder 6.1 MW 5.18 MW
920692 AA2-178 E Adder 6.02 MW 5.12 MW
923994 AB2-040_E Adder 8.98 MW 7.63 MW
924814 AB2-134 E Adder 17.54 MW 14.91 MW
316084 AB2-161 E Adder 8.1 MW 6.88 MW
316088 AB2-174 E Adder 9.52 MW 8.09 MW
316375 AC2-012 C 50/50 2.01 MW 2.01 MW
932046 AC2-012 E 50/50 19.53 MW 19.53 MW
316311 AC2-079 C Adder 8.47 MW 7.2 MW
932596 AC2-079 E Adder 13.83 MW 11.75 MW
934576 AD1-082 E Adder 6.45 MW 5.49 MW
316349 AD2-085 C Adder 5.08 MW 4.32 MW
936666 AD2-085 E Adder 8.29 MW 7.05 MW
316388 AE2-253 GEN 50/50 2.93 MW 2.93 MW
961611 AG1-000B C Adder 22.44 MW 19.07 MW
941591 AE2-156 C 50/50 26.69 MW 26.69 MW
944581 AF1-123 C 50/50 67.88 MW 67.88 MW
944582 AF1-123 E 50/50 155.43 MW 155.43 MW
944591 AF1-124 C 50/50 68.12 MW 68.12 MW
944592 AF1-124 E 50/50 155.99 MW 155.99 MW
944601 AF1-125 C 50/50 66.83 MW 66.83 MW
944602 AF1-125 E 50/50 152.99 MW 152.99 MW
962491 AG1-098 C Adder 16.49 MW 14.01 MW
962492 AG1-098 E Adder 10.99 MW 9.34 MW
964241 AG1-285 C Adder 18.56 MW 15.78 MW
964242 AG1-285 E Adder 12.38 MW 10.52 MW
965281 AG1-393 C Adder 3.01 MW 2.56 MW
965282 AG1-393 E Adder 2.01 MW 1.71 MW
313764 3SOCKMAN Adder 1.04 MW 0.88 MW
932632 AC2-084 E Adder 4.14 MW 3.52 MW
934501 AD1-074 C Adder 49.08 MW 41.72 MW
934502 AD1-074 E Adder 24.99 MW 21.24 MW
934511 AD1-075 C Adder 12.27 MW 10.43 MW
934512 AD1-075 E Adder 6.25 MW 5.31 MW
934612 AD1-087 E Adder 5.27 MW 4.48 MW
935161 AD1-151 C Adder 22.24 MW 18.91 MW
935162 AD1-151 E Adder 14.83 MW 12.61 MW
937482 AD2-202 E Adder 1.54 MW 1.31 MW
938531 AE1-072 C Adder 26.21 MW 22.28 MW
938532 AE1-072 E Adder 13.66 MW 11.61 MW
939191 AE1-149 C Adder 15.63 MW 13.29 MW
939192 AE1-149 E Adder 10.42 MW 8.86 MW
940431 AE2-027 C Adder 17.91 MW 15.22 MW
940432 AE2-027 E Adder 11.94 MW 10.15 MW
940481 AE2-033 C 50/50 24.22 MW 24.22 MW
940482 AE2-033 E 50/50 16.33 MW 16.33 MW
940541 AE2-040 C 50/50 4.31 MW 4.31 MW
940641 AE2-051 C 50/50 27.7 MW 27.7 MW
940642 AE2-051 E 50/50 18.47 MW 18.47 MW
941101 AE2-104 C Adder 4.97 MW 4.23 MW
941102 AE2-104 E Adder 7.91 MW 6.72 MW
944641 AF1-129 C Adder 139.93 MW 118.94 MW
316303 AF2-085 50/50 6.52 MW 6.52 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 38.28 MW 38.28 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 28.32 MW 28.32 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 126.25 MW 126.25 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.54 MW 5.54 MW
NY PJM->LTFIMP_NY CLTF 2.57 MW 2.57 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.53 MW 1.53 MW
WEC LTFEXP_WEC->PJM CLTF 0.8 MW 0.8 MW
CPLE LTFEXP_CPLE->PJM CLTF 15.38 MW 15.38 MW
TVA LTFEXP_TVA->PJM CLTF 7.72 MW 7.72 MW
MEC LTFEXP_MEC->PJM CLTF 4.91 MW 4.91 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.82 MW 9.82 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.3 MW 0.3 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 35.26 MW 35.26 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.33 MW 7.33 MW

Details for 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P4-2: H6T576_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
Contingency Name:
DVP_P4-2: H6T576_SRT-A
CONTINGENCY 'DVP_P4-2: H6T576_SRT-A'
 OPEN BRANCH FROM BUS 314322 TO BUS 314914 CKT 1   /*6MDLTHAN     230.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 102.27 %
Rating: 3144.0 MVA
Rating Type: C
MVA to Mitigate: 3215.35 MVA
MW Contribution: 246.18 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.06 MW 0.9 MW
961672 AG1-007 E Adder 0.6 MW 0.51 MW
961941 AG1-037 C Adder 0.67 MW 0.57 MW
961942 AG1-037 E Adder 0.45 MW 0.38 MW
962331 AG1-082 C Adder 2.67 MW 2.27 MW
962332 AG1-082 E Adder 1.78 MW 1.51 MW
963041 AG1-153 C Adder 6.86 MW 5.83 MW
963042 AG1-153 E Adder 10.28 MW 8.74 MW
964791 AG1-342 C Adder 3.49 MW 2.96 MW
964792 AG1-342 E Adder 2.33 MW 1.98 MW
966801 AG1-551 C Adder 2.65 MW 2.25 MW
966802 AG1-551 E Adder 1.4 MW 1.19 MW
966811 AG1-552 C Adder 2.45 MW 2.08 MW
966812 AG1-552 E Adder 1.16 MW 0.99 MW
965291 AG1-394 C Adder 1.13 MW 0.96 MW
965292 AG1-394 E Adder 2.08 MW 1.77 MW
966621 AG1-532 C Adder 1.56 MW 1.32 MW
966622 AG1-532 E Adder 1.04 MW 0.88 MW
314541 3WATKINS Adder 0.96 MW 0.81 MW
314572 3EMPORIA Adder 0.48 MW 0.41 MW
315131 1EDGECMA Adder 17.13 MW 14.56 MW
918492 AA1-063AE OP Adder 5.08 MW 4.32 MW
918532 AA1-067 E Adder 0.88 MW 0.74 MW
919692 AA2-053 E OP Adder 5.13 MW 4.36 MW
920042 AA2-088 E OP Adder 14.14 MW 12.02 MW
925785 AC1-054 E Adder 3.81 MW 3.24 MW
926274 AC1-105 E Adder 0.55 MW 0.47 MW
927146 AC1-208 E Adder 5.09 MW 4.33 MW
934521 AD1-076 C Adder 17.3 MW 14.7 MW
934522 AD1-076 E Adder 8.82 MW 7.5 MW
943172 AE2-346 E Adder 0.8 MW 0.68 MW
944011 AF1-069 C Adder 16.1 MW 13.68 MW
944012 AF1-069 E Adder 6.25 MW 5.32 MW
959311 AF2-222 C Adder 16.0 MW 13.6 MW
959312 AF2-222 E Adder 10.72 MW 9.11 MW
960081 AF2-299 C Adder 2.08 MW 1.76 MW
960082 AF2-299 E Adder 1.38 MW 1.18 MW
316141 AB2-099 E Adder 0.33 MW 0.28 MW
900672 V4-068 E Adder 0.47 MW 0.4 MW
917342 Z2-044 E Adder 0.79 MW 0.67 MW
922923 AB1-081 E OP Adder 4.22 MW 3.59 MW
923263 AB1-132 E OP Adder 7.05 MW 6.0 MW
923573 AB1-173 E OP Adder 3.76 MW 3.2 MW
924162 AB2-060 E OP Adder 4.33 MW 3.68 MW
924302 AB2-077 E O1 Adder 1.36 MW 1.16 MW
924312 AB2-078 E O1 Adder 1.36 MW 1.16 MW
924322 AB2-079 E O1 Adder 1.36 MW 1.16 MW
925612 AC1-036 E Adder 0.84 MW 0.71 MW
939181 AE1-148 C Adder 9.38 MW 7.97 MW
939182 AE1-148 E Adder 6.25 MW 5.31 MW
940492 AE2-034 E Adder 4.5 MW 3.83 MW
941031 AE2-094 C Adder 49.26 MW 41.87 MW
941032 AE2-094 E Adder 22.06 MW 18.75 MW
946281 AF1-292 C Adder 1.72 MW 1.46 MW
946282 AF1-292 E Adder 1.14 MW 0.97 MW
957481 AF2-042 C Adder 59.6 MW 50.66 MW
957482 AF2-042 E Adder 39.74 MW 33.77 MW
957521 AF2-046 C Adder 18.79 MW 15.97 MW
957522 AF2-046 E Adder 9.5 MW 8.07 MW
957861 AF2-080 C Adder 9.04 MW 7.68 MW
957862 AF2-080 E Adder 4.0 MW 3.4 MW
314539 3UNCAMP Adder 8.59 MW 7.3 MW
916042 Z1-036 E Adder 43.42 MW 36.91 MW
938771 AE1-103 C Adder 4.18 MW 3.55 MW
938772 AE1-103 E Adder 5.77 MW 4.91 MW
314507 3THOMPSN Adder 3.3 MW 2.8 MW
314525 6KINGFORK Adder 1.53 MW 1.3 MW
314550 6HICKORY 50/50 3.64 MW 3.64 MW
315092 1YORKTN3 Adder 182.37 MW 155.02 MW
926662 AC1-147 E 50/50 2.16 MW 2.16 MW
926755 AC1-161 E 50/50 24.41 MW 24.41 MW
927226 AC1-216 E Adder 7.2 MW 6.12 MW
935112 AD1-144 E Adder 1.42 MW 1.21 MW
942341 AE2-247 C Adder 2.0 MW 1.7 MW
942342 AE2-247 E Adder 2.76 MW 2.34 MW
943461 AF1-017 C Adder 1.81 MW 1.53 MW
943462 AF1-017 E Adder 2.95 MW 2.5 MW
943612 AF1-032 E Adder 1.46 MW 1.24 MW
315098 1CHESPKA 50/50 0.71 MW 0.71 MW
315099 1CHESPKB 50/50 1.18 MW 1.18 MW
315108 1ELIZAR1 50/50 5.25 MW 5.25 MW
315109 1ELIZAR2 50/50 5.16 MW 5.16 MW
315110 1ELIZAR3 50/50 5.32 MW 5.32 MW
315233 1SURRY 2 50/50 52.27 MW 52.27 MW
315260 1GOSPORTA Adder 3.48 MW 2.96 MW
315261 1GOSPORTB 50/50 4.44 MW 4.44 MW
315262 1GOSPORTC 50/50 3.77 MW 3.77 MW
913392 Y1-086 E Adder 3.54 MW 3.01 MW
916192 Z1-068 E 50/50 3.11 MW 3.11 MW
923832 AB2-022 E Adder 2.0 MW 1.7 MW
923852 AB2-025 E Adder 1.22 MW 1.03 MW
939312 AE1-162 E Adder 1.97 MW 1.67 MW
957492 AF2-043 E Adder 2.25 MW 1.91 MW
962962 AG1-145 E Adder 1.4 MW 1.19 MW
901082 W1-029 E Adder 50.02 MW 42.52 MW
917122 Z2-027 E Adder 2.14 MW 1.82 MW
925522 AC1-027 E 50/50 2.01 MW 2.01 MW
957832 AF2-077 E Adder 1.41 MW 1.2 MW
957871 AF2-081 C 50/50 16.49 MW 16.49 MW
957872 AF2-081 E 50/50 7.07 MW 7.07 MW
958161 AF2-110 C Adder 2.05 MW 1.75 MW
958162 AF2-110 E Adder 3.27 MW 2.78 MW
314722 3TWITTYS Adder 0.93 MW 0.79 MW
917512 Z2-088 E OP1 Adder 5.69 MW 4.83 MW
926071 AC1-086 C Adder 24.24 MW 20.6 MW
926072 AC1-086 E Adder 11.03 MW 9.38 MW
927021 AC1-189 C Adder 9.95 MW 8.46 MW
927022 AC1-189 E Adder 4.96 MW 4.21 MW
933291 AC2-141 C 50/50 57.19 MW 57.19 MW
933292 AC2-141 E 50/50 24.41 MW 24.41 MW
934621 AD1-088 C Adder 13.21 MW 11.23 MW
934622 AD1-088 E Adder 6.22 MW 5.28 MW
939411 AE1-173 C Adder 130.54 MW 110.96 MW
939412 AE1-173 E Adder 87.03 MW 73.97 MW
934012 AD1-025 E Adder 9.32 MW 7.92 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 12.21 MW 10.38 MW
933982 AD1-022 E Adder 6.65 MW 5.65 MW
962572 AG1-106 E Adder 1.37 MW 1.17 MW
961681 AG1-008 C Adder 18.79 MW 15.97 MW
961682 AG1-008 E Adder 9.5 MW 8.07 MW
962571 AG1-106 C Adder 3.14 MW 2.67 MW
314594 6PLYMOUTH TP Adder 0.46 MW 0.39 MW
314632 6AYDLETT TAP Adder 2.22 MW 1.89 MW
316036 AC1-147 C 50/50 0.6 MW 0.6 MW
316160 AE1-175 E Adder 1.15 MW 0.98 MW
316185 AD1-033 C 50/50 2.06 MW 2.06 MW
316263 AC1-034 C Adder 7.48 MW 6.36 MW
316274 AC1-208 C Adder 11.47 MW 9.75 MW
316294 AC1-161 C 50/50 9.35 MW 9.35 MW
316316 AC1-027 C 50/50 0.52 MW 0.52 MW
917332 KELFORD E Adder 2.16 MW 1.83 MW
924516 AB2-100 E1 Adder 3.2 MW 2.72 MW
924517 AB2-100 E2 Adder 3.2 MW 2.72 MW
925595 AC1-034 E Adder 5.65 MW 4.8 MW
926206 AC1-098 E Adder 4.71 MW 4.0 MW
926214 AC1-099 E Adder 1.56 MW 1.32 MW
934065 AD1-033 E 50/50 8.39 MW 8.39 MW
937226 AE2-253 E 50/50 9.68 MW 9.68 MW
918512 AA1-065 E OP Adder 7.39 MW 6.28 MW
316017 AA1-139 ULT1 50/50 1.78 MW 1.78 MW
316018 AA1-139 ULT2 50/50 1.78 MW 1.78 MW
919153 AA1-139 E2 50/50 6.74 MW 6.74 MW
919152 AA1-139 E1 50/50 6.74 MW 6.74 MW
919710 AA2-057 E Adder 5.17 MW 4.4 MW
920692 AA2-178 E Adder 6.0 MW 5.1 MW
923994 AB2-040_E Adder 7.06 MW 6.0 MW
924022 AB2-043 E O1 Adder 5.28 MW 4.49 MW
924152 AB2-059 E OP Adder 5.92 MW 5.03 MW
924814 AB2-134 E Adder 11.79 MW 10.02 MW
316084 AB2-161 E Adder 6.01 MW 5.11 MW
925122 AB2-169 E Adder 7.62 MW 6.47 MW
316088 AB2-174 E Adder 7.4 MW 6.29 MW
316375 AC2-012 C 50/50 2.21 MW 2.21 MW
932046 AC2-012 E 50/50 21.39 MW 21.39 MW
316311 AC2-079 C Adder 7.79 MW 6.62 MW
932596 AC2-079 E Adder 12.72 MW 10.81 MW
934576 AD1-082 E Adder 4.79 MW 4.07 MW
316349 AD2-085 C Adder 4.61 MW 3.92 MW
936666 AD2-085 E Adder 7.52 MW 6.39 MW
316388 AE2-253 GEN 50/50 3.26 MW 3.26 MW
961611 AG1-000B C Adder 18.13 MW 15.41 MW
941591 AE2-156 C 50/50 29.28 MW 29.28 MW
944581 AF1-123 C 50/50 76.02 MW 76.02 MW
944582 AF1-123 E 50/50 174.06 MW 174.06 MW
944591 AF1-124 C 50/50 76.28 MW 76.28 MW
944592 AF1-124 E 50/50 174.7 MW 174.7 MW
944601 AF1-125 C 50/50 74.84 MW 74.84 MW
944602 AF1-125 E 50/50 171.33 MW 171.33 MW
962491 AG1-098 C Adder 11.73 MW 9.97 MW
962492 AG1-098 E Adder 7.82 MW 6.65 MW
962561 AG1-105 C Adder 8.8 MW 7.48 MW
962562 AG1-105 E Adder 5.86 MW 4.98 MW
964241 AG1-285 C Adder 13.12 MW 11.15 MW
964242 AG1-285 E Adder 8.75 MW 7.43 MW
313764 3SOCKMAN Adder 0.83 MW 0.71 MW
932632 AC2-084 E Adder 4.16 MW 3.54 MW
934321 AD1-056 C Adder 7.04 MW 5.98 MW
934322 AD1-056 E Adder 3.82 MW 3.25 MW
934331 AD1-057 C Adder 3.93 MW 3.34 MW
934332 AD1-057 E Adder 2.04 MW 1.74 MW
934501 AD1-074 C Adder 47.63 MW 40.49 MW
934502 AD1-074 E Adder 24.25 MW 20.61 MW
934511 AD1-075 C Adder 11.91 MW 10.12 MW
934512 AD1-075 E Adder 6.06 MW 5.15 MW
934612 AD1-087 E Adder 3.87 MW 3.29 MW
935172 AD1-152 E Adder 5.69 MW 4.84 MW
937482 AD2-202 E Adder 1.13 MW 0.96 MW
938531 AE1-072 C 50/50 28.87 MW 28.87 MW
938532 AE1-072 E 50/50 15.05 MW 15.05 MW
939191 AE1-149 C Adder 9.8 MW 8.33 MW
939192 AE1-149 E Adder 6.53 MW 5.55 MW
940481 AE2-033 C Adder 17.07 MW 14.51 MW
940482 AE2-033 E Adder 11.51 MW 9.78 MW
940541 AE2-040 C Adder 3.01 MW 2.56 MW
940641 AE2-051 C Adder 23.72 MW 20.16 MW
940642 AE2-051 E Adder 15.81 MW 13.44 MW
941101 AE2-104 C Adder 5.03 MW 4.28 MW
941102 AE2-104 E Adder 8.0 MW 6.8 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 19.03 MW 19.03 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 17.52 MW 17.52 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 92.84 MW 92.84 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.12 MW 3.12 MW
NY PJM->LTFIMP_NY CLTF 1.49 MW 1.49 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.77 MW 0.77 MW
WEC LTFEXP_WEC->PJM CLTF 0.41 MW 0.41 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.71 MW 11.71 MW
TVA LTFEXP_TVA->PJM CLTF 4.99 MW 4.99 MW
MEC LTFEXP_MEC->PJM CLTF 2.75 MW 2.75 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.43 MW 6.43 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.16 MW 0.16 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 19.92 MW 19.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.58 MW 5.58 MW

Details for 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line l/o DVP_P4-2: H6T563_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
Contingency Name:
DVP_P4-2: H6T563_SRT-S
CONTINGENCY 'DVP_P4-2: H6T563_SRT-S'
 OPEN BRANCH FROM BUS 314322 TO BUS 314914 CKT 1                /*6MDLTHAN     230.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 102.27 %
Rating: 3144.0 MVA
Rating Type: C
MVA to Mitigate: 3215.35 MVA
MW Contribution: 246.18 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.06 MW 0.9 MW
961672 AG1-007 E Adder 0.6 MW 0.51 MW
961941 AG1-037 C Adder 0.67 MW 0.57 MW
961942 AG1-037 E Adder 0.45 MW 0.38 MW
962331 AG1-082 C Adder 2.67 MW 2.27 MW
962332 AG1-082 E Adder 1.78 MW 1.51 MW
963041 AG1-153 C Adder 6.86 MW 5.83 MW
963042 AG1-153 E Adder 10.28 MW 8.74 MW
964791 AG1-342 C Adder 3.49 MW 2.96 MW
964792 AG1-342 E Adder 2.33 MW 1.98 MW
966801 AG1-551 C Adder 2.65 MW 2.25 MW
966802 AG1-551 E Adder 1.4 MW 1.19 MW
966811 AG1-552 C Adder 2.45 MW 2.08 MW
966812 AG1-552 E Adder 1.16 MW 0.99 MW
965291 AG1-394 C Adder 1.13 MW 0.96 MW
965292 AG1-394 E Adder 2.08 MW 1.77 MW
966621 AG1-532 C Adder 1.56 MW 1.32 MW
966622 AG1-532 E Adder 1.04 MW 0.88 MW
314541 3WATKINS Adder 0.96 MW 0.81 MW
314572 3EMPORIA Adder 0.48 MW 0.41 MW
315131 1EDGECMA Adder 17.13 MW 14.56 MW
918492 AA1-063AE OP Adder 5.08 MW 4.32 MW
918532 AA1-067 E Adder 0.88 MW 0.74 MW
919692 AA2-053 E OP Adder 5.13 MW 4.36 MW
920042 AA2-088 E OP Adder 14.14 MW 12.02 MW
925785 AC1-054 E Adder 3.81 MW 3.24 MW
926274 AC1-105 E Adder 0.55 MW 0.47 MW
927146 AC1-208 E Adder 5.09 MW 4.33 MW
934521 AD1-076 C Adder 17.3 MW 14.7 MW
934522 AD1-076 E Adder 8.82 MW 7.5 MW
943172 AE2-346 E Adder 0.8 MW 0.68 MW
944011 AF1-069 C Adder 16.1 MW 13.68 MW
944012 AF1-069 E Adder 6.25 MW 5.32 MW
959311 AF2-222 C Adder 16.0 MW 13.6 MW
959312 AF2-222 E Adder 10.72 MW 9.11 MW
960081 AF2-299 C Adder 2.08 MW 1.76 MW
960082 AF2-299 E Adder 1.38 MW 1.18 MW
316141 AB2-099 E Adder 0.33 MW 0.28 MW
900672 V4-068 E Adder 0.47 MW 0.4 MW
917342 Z2-044 E Adder 0.79 MW 0.67 MW
922923 AB1-081 E OP Adder 4.22 MW 3.59 MW
923263 AB1-132 E OP Adder 7.05 MW 6.0 MW
923573 AB1-173 E OP Adder 3.76 MW 3.2 MW
924162 AB2-060 E OP Adder 4.33 MW 3.68 MW
924302 AB2-077 E O1 Adder 1.36 MW 1.16 MW
924312 AB2-078 E O1 Adder 1.36 MW 1.16 MW
924322 AB2-079 E O1 Adder 1.36 MW 1.16 MW
925612 AC1-036 E Adder 0.84 MW 0.71 MW
939181 AE1-148 C Adder 9.38 MW 7.97 MW
939182 AE1-148 E Adder 6.25 MW 5.31 MW
940492 AE2-034 E Adder 4.5 MW 3.83 MW
941031 AE2-094 C Adder 49.26 MW 41.87 MW
941032 AE2-094 E Adder 22.06 MW 18.75 MW
946281 AF1-292 C Adder 1.72 MW 1.46 MW
946282 AF1-292 E Adder 1.14 MW 0.97 MW
957481 AF2-042 C Adder 59.6 MW 50.66 MW
957482 AF2-042 E Adder 39.74 MW 33.77 MW
957521 AF2-046 C Adder 18.79 MW 15.97 MW
957522 AF2-046 E Adder 9.5 MW 8.07 MW
957861 AF2-080 C Adder 9.04 MW 7.68 MW
957862 AF2-080 E Adder 4.0 MW 3.4 MW
314539 3UNCAMP Adder 8.59 MW 7.3 MW
916042 Z1-036 E Adder 43.42 MW 36.91 MW
938771 AE1-103 C Adder 4.18 MW 3.55 MW
938772 AE1-103 E Adder 5.77 MW 4.91 MW
314507 3THOMPSN Adder 3.3 MW 2.8 MW
314525 6KINGFORK Adder 1.53 MW 1.3 MW
314550 6HICKORY 50/50 3.64 MW 3.64 MW
315092 1YORKTN3 Adder 182.37 MW 155.02 MW
926662 AC1-147 E 50/50 2.16 MW 2.16 MW
926755 AC1-161 E 50/50 24.41 MW 24.41 MW
927226 AC1-216 E Adder 7.2 MW 6.12 MW
935112 AD1-144 E Adder 1.42 MW 1.21 MW
942341 AE2-247 C Adder 2.0 MW 1.7 MW
942342 AE2-247 E Adder 2.76 MW 2.34 MW
943461 AF1-017 C Adder 1.81 MW 1.53 MW
943462 AF1-017 E Adder 2.95 MW 2.5 MW
943612 AF1-032 E Adder 1.46 MW 1.24 MW
315098 1CHESPKA 50/50 0.71 MW 0.71 MW
315099 1CHESPKB 50/50 1.18 MW 1.18 MW
315108 1ELIZAR1 50/50 5.25 MW 5.25 MW
315109 1ELIZAR2 50/50 5.16 MW 5.16 MW
315110 1ELIZAR3 50/50 5.32 MW 5.32 MW
315233 1SURRY 2 50/50 52.27 MW 52.27 MW
315260 1GOSPORTA Adder 3.48 MW 2.96 MW
315261 1GOSPORTB 50/50 4.44 MW 4.44 MW
315262 1GOSPORTC 50/50 3.77 MW 3.77 MW
913392 Y1-086 E Adder 3.54 MW 3.01 MW
916192 Z1-068 E 50/50 3.11 MW 3.11 MW
923832 AB2-022 E Adder 2.0 MW 1.7 MW
923852 AB2-025 E Adder 1.22 MW 1.03 MW
939312 AE1-162 E Adder 1.97 MW 1.67 MW
957492 AF2-043 E Adder 2.25 MW 1.91 MW
962962 AG1-145 E Adder 1.4 MW 1.19 MW
901082 W1-029 E Adder 50.02 MW 42.52 MW
917122 Z2-027 E Adder 2.14 MW 1.82 MW
925522 AC1-027 E 50/50 2.01 MW 2.01 MW
957832 AF2-077 E Adder 1.41 MW 1.2 MW
957871 AF2-081 C 50/50 16.49 MW 16.49 MW
957872 AF2-081 E 50/50 7.07 MW 7.07 MW
958161 AF2-110 C Adder 2.05 MW 1.75 MW
958162 AF2-110 E Adder 3.27 MW 2.78 MW
314722 3TWITTYS Adder 0.93 MW 0.79 MW
917512 Z2-088 E OP1 Adder 5.69 MW 4.83 MW
926071 AC1-086 C Adder 24.24 MW 20.6 MW
926072 AC1-086 E Adder 11.03 MW 9.38 MW
927021 AC1-189 C Adder 9.95 MW 8.46 MW
927022 AC1-189 E Adder 4.96 MW 4.21 MW
933291 AC2-141 C 50/50 57.19 MW 57.19 MW
933292 AC2-141 E 50/50 24.41 MW 24.41 MW
934621 AD1-088 C Adder 13.21 MW 11.23 MW
934622 AD1-088 E Adder 6.22 MW 5.28 MW
939411 AE1-173 C Adder 130.54 MW 110.96 MW
939412 AE1-173 E Adder 87.03 MW 73.97 MW
934012 AD1-025 E Adder 9.32 MW 7.92 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 12.21 MW 10.38 MW
933982 AD1-022 E Adder 6.65 MW 5.65 MW
962572 AG1-106 E Adder 1.37 MW 1.17 MW
961681 AG1-008 C Adder 18.79 MW 15.97 MW
961682 AG1-008 E Adder 9.5 MW 8.07 MW
962571 AG1-106 C Adder 3.14 MW 2.67 MW
314594 6PLYMOUTH TP Adder 0.46 MW 0.39 MW
314632 6AYDLETT TAP Adder 2.22 MW 1.89 MW
316036 AC1-147 C 50/50 0.6 MW 0.6 MW
316160 AE1-175 E Adder 1.15 MW 0.98 MW
316185 AD1-033 C 50/50 2.06 MW 2.06 MW
316263 AC1-034 C Adder 7.48 MW 6.36 MW
316274 AC1-208 C Adder 11.47 MW 9.75 MW
316294 AC1-161 C 50/50 9.35 MW 9.35 MW
316316 AC1-027 C 50/50 0.52 MW 0.52 MW
917332 KELFORD E Adder 2.16 MW 1.83 MW
924516 AB2-100 E1 Adder 3.2 MW 2.72 MW
924517 AB2-100 E2 Adder 3.2 MW 2.72 MW
925595 AC1-034 E Adder 5.65 MW 4.8 MW
926206 AC1-098 E Adder 4.71 MW 4.0 MW
926214 AC1-099 E Adder 1.56 MW 1.32 MW
934065 AD1-033 E 50/50 8.39 MW 8.39 MW
937226 AE2-253 E 50/50 9.68 MW 9.68 MW
918512 AA1-065 E OP Adder 7.39 MW 6.28 MW
316017 AA1-139 ULT1 50/50 1.78 MW 1.78 MW
316018 AA1-139 ULT2 50/50 1.78 MW 1.78 MW
919153 AA1-139 E2 50/50 6.74 MW 6.74 MW
919152 AA1-139 E1 50/50 6.74 MW 6.74 MW
919710 AA2-057 E Adder 5.17 MW 4.4 MW
920692 AA2-178 E Adder 6.0 MW 5.1 MW
923994 AB2-040_E Adder 7.06 MW 6.0 MW
924022 AB2-043 E O1 Adder 5.28 MW 4.49 MW
924152 AB2-059 E OP Adder 5.92 MW 5.03 MW
924814 AB2-134 E Adder 11.79 MW 10.02 MW
316084 AB2-161 E Adder 6.01 MW 5.11 MW
925122 AB2-169 E Adder 7.62 MW 6.47 MW
316088 AB2-174 E Adder 7.4 MW 6.29 MW
316375 AC2-012 C 50/50 2.21 MW 2.21 MW
932046 AC2-012 E 50/50 21.39 MW 21.39 MW
316311 AC2-079 C Adder 7.79 MW 6.62 MW
932596 AC2-079 E Adder 12.72 MW 10.81 MW
934576 AD1-082 E Adder 4.79 MW 4.07 MW
316349 AD2-085 C Adder 4.61 MW 3.92 MW
936666 AD2-085 E Adder 7.52 MW 6.39 MW
316388 AE2-253 GEN 50/50 3.26 MW 3.26 MW
961611 AG1-000B C Adder 18.13 MW 15.41 MW
941591 AE2-156 C 50/50 29.28 MW 29.28 MW
944581 AF1-123 C 50/50 76.02 MW 76.02 MW
944582 AF1-123 E 50/50 174.06 MW 174.06 MW
944591 AF1-124 C 50/50 76.28 MW 76.28 MW
944592 AF1-124 E 50/50 174.7 MW 174.7 MW
944601 AF1-125 C 50/50 74.84 MW 74.84 MW
944602 AF1-125 E 50/50 171.33 MW 171.33 MW
962491 AG1-098 C Adder 11.73 MW 9.97 MW
962492 AG1-098 E Adder 7.82 MW 6.65 MW
962561 AG1-105 C Adder 8.8 MW 7.48 MW
962562 AG1-105 E Adder 5.86 MW 4.98 MW
964241 AG1-285 C Adder 13.12 MW 11.15 MW
964242 AG1-285 E Adder 8.75 MW 7.43 MW
313764 3SOCKMAN Adder 0.83 MW 0.71 MW
932632 AC2-084 E Adder 4.16 MW 3.54 MW
934321 AD1-056 C Adder 7.04 MW 5.98 MW
934322 AD1-056 E Adder 3.82 MW 3.25 MW
934331 AD1-057 C Adder 3.93 MW 3.34 MW
934332 AD1-057 E Adder 2.04 MW 1.74 MW
934501 AD1-074 C Adder 47.63 MW 40.49 MW
934502 AD1-074 E Adder 24.25 MW 20.61 MW
934511 AD1-075 C Adder 11.91 MW 10.12 MW
934512 AD1-075 E Adder 6.06 MW 5.15 MW
934612 AD1-087 E Adder 3.87 MW 3.29 MW
935172 AD1-152 E Adder 5.69 MW 4.84 MW
937482 AD2-202 E Adder 1.13 MW 0.96 MW
938531 AE1-072 C 50/50 28.87 MW 28.87 MW
938532 AE1-072 E 50/50 15.05 MW 15.05 MW
939191 AE1-149 C Adder 9.8 MW 8.33 MW
939192 AE1-149 E Adder 6.53 MW 5.55 MW
940481 AE2-033 C Adder 17.07 MW 14.51 MW
940482 AE2-033 E Adder 11.51 MW 9.78 MW
940541 AE2-040 C Adder 3.01 MW 2.56 MW
940641 AE2-051 C Adder 23.72 MW 20.16 MW
940642 AE2-051 E Adder 15.81 MW 13.44 MW
941101 AE2-104 C Adder 5.03 MW 4.28 MW
941102 AE2-104 E Adder 8.0 MW 6.8 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 19.03 MW 19.03 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 17.52 MW 17.52 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 92.84 MW 92.84 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.12 MW 3.12 MW
NY PJM->LTFIMP_NY CLTF 1.49 MW 1.49 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.77 MW 0.77 MW
WEC LTFEXP_WEC->PJM CLTF 0.41 MW 0.41 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.71 MW 11.71 MW
TVA LTFEXP_TVA->PJM CLTF 4.99 MW 4.99 MW
MEC LTFEXP_MEC->PJM CLTF 2.75 MW 2.75 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.43 MW 6.43 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.16 MW 0.16 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 19.92 MW 19.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.58 MW 5.58 MW

Details for 6CHESTF B-6BASIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 138.18 %
Rating: 663.64 MVA
Rating Type: B
MVA to Mitigate: 917.03 MVA
MW Contribution: 15.08 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6CHESTF B-6BASIN 230.0 kV Ckt 1 line
314287 to 314276 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 141.48 %
Rating: 663.64 MVA
Rating Type: B
MVA to Mitigate: 938.91 MVA
MW Contribution: 14.59 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.34 MW 0.29 MW
961941 AG1-037 C Adder 0.2 MW 0.17 MW
962331 AG1-082 C Adder 0.79 MW 0.67 MW
963041 AG1-153 C Adder 2.05 MW 1.74 MW
966801 AG1-551 C Adder 0.77 MW 0.66 MW
966811 AG1-552 C 80/20 0.85 MW 0.85 MW
965291 AG1-394 C 80/20 0.34 MW 0.34 MW
966621 AG1-532 C 80/20 0.65 MW 0.65 MW
313506 AB1-173 C OP 80/20 0.5 MW 0.5 MW
314704 3LAWRENC 80/20 0.13 MW 0.13 MW
315126 1ROARAP2 80/20 0.58 MW 0.58 MW
315128 1ROARAP4 80/20 0.55 MW 0.55 MW
315131 1EDGECMA Adder 5.67 MW 4.82 MW
315136 1ROSEMG1 80/20 0.89 MW 0.89 MW
315137 1ROSEMS1 80/20 0.55 MW 0.55 MW
315138 1ROSEMG2 80/20 0.42 MW 0.42 MW
315139 1GASTONA 80/20 1.36 MW 1.36 MW
934521 AD1-076 C Adder 4.52 MW 3.84 MW
944011 AF1-069 C 80/20 4.81 MW 4.81 MW
960081 AF2-299 C 80/20 0.86 MW 0.86 MW
315606 3AA2-053SOLA 80/20 0.62 MW 0.62 MW
939181 AE1-148 C Adder 2.86 MW 2.44 MW
941031 AE2-094 C 80/20 14.73 MW 14.73 MW
946281 AF1-292 C 80/20 0.71 MW 0.71 MW
957481 AF2-042 C Adder 17.33 MW 14.73 MW
957521 AF2-046 C Adder 5.63 MW 4.79 MW
957861 AF2-080 C Adder 2.79 MW 2.37 MW
938771 AE1-103 C 80/20 1.16 MW 1.16 MW
314507 3THOMPSN Adder 0.7 MW 0.6 MW
315065 1CHESTF6 80/20 26.33 MW 26.33 MW
315073 1STONECA 80/20 4.79 MW 4.79 MW
315076 1HOPPOLC 80/20 1.06 MW 1.06 MW
315077 1HOPHCF1 80/20 1.69 MW 1.69 MW
315078 1HOPHCF2 80/20 1.69 MW 1.69 MW
315079 1HOPHCF3 80/20 1.69 MW 1.69 MW
315080 1HOPHCF4 80/20 2.57 MW 2.57 MW
942341 AE2-247 C 80/20 0.71 MW 0.71 MW
943461 AF1-017 C 80/20 0.65 MW 0.65 MW
315102 1BRUNSWICKG1 80/20 3.02 MW 3.02 MW
315103 1BRUNSWICKG2 80/20 3.02 MW 3.02 MW
315104 1BRUNSWICKG3 80/20 3.02 MW 3.02 MW
315105 1BRUNSWICKS1 80/20 6.28 MW 6.28 MW
315115 1S HAMPT1 80/20 0.6 MW 0.6 MW
315116 1SURRY 1 80/20 11.05 MW 11.05 MW
315117 1GRAVELC 80/20 0.39 MW 0.39 MW
315119 1GRAVEL3 80/20 1.12 MW 1.12 MW
315120 1GRAVEL4 80/20 1.14 MW 1.14 MW
315121 1GRAVEL5 80/20 1.12 MW 1.12 MW
315122 1GRAVEL6 80/20 1.14 MW 1.14 MW
315141 1GASTONB 80/20 1.36 MW 1.36 MW
315241 1Z1-086 GT1 80/20 3.87 MW 3.87 MW
315242 1Z1-086 GT2 80/20 3.87 MW 3.87 MW
315243 1Z1-086 GT3 80/20 3.87 MW 3.87 MW
315244 1Z1-086 ST 80/20 6.74 MW 6.74 MW
315260 1GOSPORTA Adder 0.74 MW 0.63 MW
315261 1GOSPORTB Adder 0.95 MW 0.81 MW
315262 1GOSPORTC Adder 0.81 MW 0.69 MW
315607 3AA1-063SOLA 80/20 0.58 MW 0.58 MW
315608 3AA2-088SOLA 80/20 0.43 MW 0.43 MW
316132 AB2-190 C 80/20 2.54 MW 2.54 MW
942001 AE2-212 C 80/20 2.35 MW 2.35 MW
957871 AF2-081 C Adder 3.41 MW 2.9 MW
958161 AF2-110 C 80/20 0.53 MW 0.53 MW
926071 AC1-086 C 80/20 9.33 MW 9.33 MW
927021 AC1-189 C Adder 3.07 MW 2.61 MW
933291 AC2-141 C Adder 8.97 MW 7.62 MW
934621 AD1-088 C Adder 3.74 MW 3.18 MW
939411 AE1-173 C Adder 32.45 MW 27.59 MW
934011 AD1-025 C 80/20 1.45 MW 1.45 MW
933981 AD1-022 C Adder 3.27 MW 2.78 MW
961681 AG1-008 C Adder 5.63 MW 4.79 MW
962571 AG1-106 C 80/20 1.21 MW 1.21 MW
316011 AB1-132 C OP 80/20 1.04 MW 1.04 MW
316023 AB2-100 C2 80/20 0.48 MW 0.48 MW
316236 AE1-162 C 80/20 0.14 MW 0.14 MW
316240 AF1-291 C 80/20 2.79 MW 2.79 MW
316263 AC1-034 C Adder 2.43 MW 2.07 MW
316274 AC1-208 C 80/20 3.8 MW 3.8 MW
316315 AB2-025 C 80/20 0.24 MW 0.24 MW
316319 Z2-044 C 80/20 0.09 MW 0.09 MW
316365 AB2-100 C1 80/20 0.48 MW 0.48 MW
316369 AC1-216 C 80/20 0.9 MW 0.9 MW
316327 AA2-057 C 80/20 0.56 MW 0.56 MW
316181 AB2-040 GEN 80/20 0.56 MW 0.56 MW
316033 AB2-134 GEN 80/20 1.18 MW 1.18 MW
316083 AB2-161 C 80/20 0.34 MW 0.34 MW
316087 AB2-174 C 80/20 0.53 MW 0.53 MW
316311 AC2-079 C 80/20 2.68 MW 2.68 MW
316381 AD1-082 C 80/20 0.77 MW 0.77 MW
316349 AD2-085 C 80/20 1.65 MW 1.65 MW
961611 AG1-000B C 80/20 7.59 MW 7.59 MW
941591 AE2-156 C Adder 6.23 MW 5.3 MW
944581 AF1-123 C Adder 15.31 MW 13.02 MW
944591 AF1-124 C Adder 15.37 MW 13.06 MW
944601 AF1-125 C Adder 15.08 MW 12.81 MW
965281 AG1-393 C 80/20 1.07 MW 1.07 MW
313764 3SOCKMAN 80/20 0.3 MW 0.3 MW
934321 AD1-056 C Adder 2.5 MW 2.12 MW
934331 AD1-057 C Adder 1.39 MW 1.18 MW
934501 AD1-074 C Adder 12.45 MW 10.58 MW
934511 AD1-075 C Adder 3.11 MW 2.65 MW
935161 AD1-151 C 80/20 9.48 MW 9.48 MW
938531 AE1-072 C Adder 6.01 MW 5.11 MW
939191 AE1-149 C 80/20 7.58 MW 7.58 MW
940431 AE2-027 C 80/20 5.4 MW 5.4 MW
940481 AE2-033 C 80/20 9.25 MW 9.25 MW
940541 AE2-040 C 80/20 1.67 MW 1.67 MW
940641 AE2-051 C 80/20 6.29 MW 6.29 MW
941101 AE2-104 C 80/20 1.31 MW 1.31 MW
944641 AF1-129 C 80/20 137.34 MW 137.34 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 6.96 MW 6.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 5.77 MW 5.77 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 28.82 MW 28.82 MW
NY PJM->LTFIMP_NY CLTF 0.43 MW 0.43 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.28 MW 0.28 MW
WEC LTFEXP_WEC->PJM CLTF 0.15 MW 0.15 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.61 MW 3.61 MW
TVA LTFEXP_TVA->PJM CLTF 1.61 MW 1.61 MW
MEC LTFEXP_MEC->PJM CLTF 0.95 MW 0.95 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.07 MW 2.07 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.72 MW 1.72 MW

Details for 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 105.13 %
Rating: 1058.16 MVA
Rating Type: B
MVA to Mitigate: 1112.41 MVA
MW Contribution: 18.54 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 104.72 %
Rating: 1058.16 MVA
Rating Type: B
MVA to Mitigate: 1108.12 MVA
MW Contribution: 18.25 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.41 MW 0.35 MW
961941 AG1-037 C 80/20 0.21 MW 0.21 MW
962331 AG1-082 C 80/20 0.85 MW 0.85 MW
963041 AG1-153 C 80/20 3.75 MW 3.75 MW
964791 AG1-342 C 80/20 1.53 MW 1.53 MW
966801 AG1-551 C Adder 0.91 MW 0.77 MW
966811 AG1-552 C 80/20 0.89 MW 0.89 MW
965291 AG1-394 C Adder 0.35 MW 0.3 MW
966621 AG1-532 C 80/20 0.6 MW 0.6 MW
313506 AB1-173 C OP 80/20 0.49 MW 0.49 MW
314704 3LAWRENC 80/20 0.13 MW 0.13 MW
315126 1ROARAP2 80/20 0.6 MW 0.6 MW
315128 1ROARAP4 80/20 0.56 MW 0.56 MW
315131 1EDGECMA Adder 6.83 MW 5.81 MW
315136 1ROSEMG1 80/20 0.88 MW 0.88 MW
315137 1ROSEMS1 80/20 0.54 MW 0.54 MW
315138 1ROSEMG2 80/20 0.41 MW 0.41 MW
315139 1GASTONA 80/20 1.31 MW 1.31 MW
315153 1CLOVER1 80/20 6.55 MW 6.55 MW
315154 1CLOVER2 80/20 6.49 MW 6.49 MW
315158 1KERR 1 80/20 0.18 MW 0.18 MW
315159 1KERR 2 80/20 0.51 MW 0.51 MW
315160 1KERR 3 80/20 0.51 MW 0.51 MW
315161 1KERR 4 80/20 0.51 MW 0.51 MW
315162 1KERR 5 80/20 0.51 MW 0.51 MW
934521 AD1-076 C 80/20 5.13 MW 5.13 MW
943171 AE2-346 C 80/20 0.1 MW 0.1 MW
944011 AF1-069 C 80/20 8.9 MW 8.9 MW
959311 AF2-222 C Adder 5.8 MW 4.93 MW
960061 AF2-297 C 80/20 3.42 MW 3.42 MW
960081 AF2-299 C 80/20 0.8 MW 0.8 MW
315163 1KERR 6 80/20 0.51 MW 0.51 MW
315164 1KERR 7 80/20 0.51 MW 0.51 MW
315266 1PLYWOOD A 80/20 0.53 MW 0.53 MW
315606 3AA2-053SOLA 80/20 0.65 MW 0.65 MW
316118 AC1-105 C 80/20 0.4 MW 0.4 MW
316129 AC1-054 C 80/20 0.53 MW 0.53 MW
316140 AB2-099 C 80/20 0.04 MW 0.04 MW
939181 AE1-148 C 80/20 3.96 MW 3.96 MW
940491 AE2-034 C 80/20 0.48 MW 0.48 MW
941011 AE2-092 C Adder -4.44 MW -3.77 MW
941031 AE2-094 C 80/20 27.23 MW 27.23 MW
946281 AF1-292 C 80/20 0.67 MW 0.67 MW
957481 AF2-042 C 80/20 29.33 MW 29.33 MW
957521 AF2-046 C 80/20 5.93 MW 5.93 MW
957861 AF2-080 C Adder 3.33 MW 2.83 MW
938771 AE1-103 C Adder 1.16 MW 0.99 MW
313526 AB2-022 C 80/20 0.15 MW 0.15 MW
314507 3THOMPSN Adder 0.8 MW 0.68 MW
942341 AE2-247 C Adder 0.49 MW 0.42 MW
943461 AF1-017 C Adder 0.45 MW 0.38 MW
315102 1BRUNSWICKG1 80/20 5.53 MW 5.53 MW
315103 1BRUNSWICKG2 80/20 5.53 MW 5.53 MW
315104 1BRUNSWICKG3 80/20 5.53 MW 5.53 MW
315105 1BRUNSWICKS1 80/20 11.49 MW 11.49 MW
315108 1ELIZAR1 80/20 1.27 MW 1.27 MW
315109 1ELIZAR2 80/20 1.25 MW 1.25 MW
315110 1ELIZAR3 80/20 1.29 MW 1.29 MW
315141 1GASTONB 80/20 1.31 MW 1.31 MW
315241 1Z1-086 GT1 80/20 7.11 MW 7.11 MW
315242 1Z1-086 GT2 80/20 7.1 MW 7.1 MW
315243 1Z1-086 GT3 80/20 7.1 MW 7.1 MW
315244 1Z1-086 ST 80/20 12.37 MW 12.37 MW
315260 1GOSPORTA Adder 0.84 MW 0.71 MW
315261 1GOSPORTB Adder 1.08 MW 0.91 MW
315262 1GOSPORTC Adder 0.91 MW 0.78 MW
315605 6W1-029WIND 80/20 0.32 MW 0.32 MW
315607 3AA1-063SOLA 80/20 0.6 MW 0.6 MW
315611 6Z1-036WIND 80/20 0.27 MW 0.27 MW
957871 AF2-081 C 80/20 4.13 MW 4.13 MW
958161 AF2-110 C Adder 0.52 MW 0.44 MW
926071 AC1-086 C 80/20 9.03 MW 9.03 MW
927021 AC1-189 C Adder 3.67 MW 3.12 MW
936261 AD2-033 C Adder 4.4 MW 3.74 MW
933291 AC2-141 C 80/20 13.23 MW 13.23 MW
934621 AD1-088 C 80/20 5.98 MW 5.98 MW
939411 AE1-173 C 80/20 54.42 MW 54.42 MW
916191 Z1-068 C 80/20 0.02 MW 0.02 MW
933981 AD1-022 C 80/20 3.68 MW 3.68 MW
961681 AG1-008 C 80/20 5.93 MW 5.93 MW
962571 AG1-106 C 80/20 1.17 MW 1.17 MW
316011 AB1-132 C OP 80/20 1.0 MW 1.0 MW
316023 AB2-100 C2 80/20 0.41 MW 0.41 MW
316185 AD1-033 C 80/20 0.51 MW 0.51 MW
316210 AC1-098 C 80/20 0.42 MW 0.42 MW
316212 AC1-099 C 80/20 0.14 MW 0.14 MW
316222 AC1-221 C 80/20 0.65 MW 0.65 MW
316246 AF1-032 C 80/20 0.11 MW 0.11 MW
316248 AF1-058 C 80/20 0.14 MW 0.14 MW
316263 AC1-034 C Adder 2.92 MW 2.48 MW
316274 AC1-208 C 80/20 4.0 MW 4.0 MW
316294 AC1-161 C 80/20 2.16 MW 2.16 MW
316305 AF2-043 C 80/20 0.14 MW 0.14 MW
316315 AB2-025 C 80/20 0.18 MW 0.18 MW
316316 AC1-027 C 80/20 0.13 MW 0.13 MW
316317 KELFORD C 80/20 0.15 MW 0.15 MW
316318 V4-068 C 80/20 0.03 MW 0.03 MW
316319 Z2-044 C 80/20 0.1 MW 0.1 MW
316320 Y1-086 C 80/20 0.09 MW 0.09 MW
316321 Z2-027 C 80/20 0.15 MW 0.15 MW
316336 AC2-165 C Adder -10.77 MW -9.16 MW
316365 AB2-100 C1 80/20 0.41 MW 0.41 MW
315602 1HOLLOMANSOL 80/20 0.78 MW 0.78 MW
316017 AA1-139 ULT1 80/20 0.45 MW 0.45 MW
316018 AA1-139 ULT2 80/20 0.45 MW 0.45 MW
316327 AA2-057 C 80/20 0.59 MW 0.59 MW
315614 AA2-178 C 80/20 0.65 MW 0.65 MW
316181 AB2-040 GEN 80/20 0.55 MW 0.55 MW
316087 AB2-174 C 80/20 0.51 MW 0.51 MW
316311 AC2-079 C Adder 1.94 MW 1.65 MW
316349 AD2-085 C Adder 1.14 MW 0.97 MW
316388 AE2-253 GEN 80/20 0.81 MW 0.81 MW
941591 AE2-156 C 80/20 7.09 MW 7.09 MW
944581 AF1-123 C 80/20 18.83 MW 18.83 MW
944591 AF1-124 C 80/20 18.89 MW 18.89 MW
944601 AF1-125 C 80/20 18.54 MW 18.54 MW
962491 AG1-098 C 80/20 5.22 MW 5.22 MW
962561 AG1-105 C 80/20 3.83 MW 3.83 MW
964241 AG1-285 C 80/20 5.55 MW 5.55 MW
313764 3SOCKMAN 80/20 0.31 MW 0.31 MW
932631 AC2-084 C 80/20 0.44 MW 0.44 MW
934321 AD1-056 C Adder 2.73 MW 2.32 MW
934331 AD1-057 C Adder 1.52 MW 1.29 MW
934501 AD1-074 C 80/20 14.13 MW 14.13 MW
934511 AD1-075 C 80/20 3.53 MW 3.53 MW
934611 AD1-087 C 80/20 0.65 MW 0.65 MW
935171 AD1-152 C 80/20 0.66 MW 0.66 MW
936161 AD2-022 C Adder 3.15 MW 2.67 MW
936171 AD2-023 C Adder 1.84 MW 1.56 MW
937481 AD2-202 C 80/20 0.19 MW 0.19 MW
938531 AE1-072 C 80/20 7.26 MW 7.26 MW
938821 AE1-108 C Adder -4.69 MW -3.99 MW
940481 AE2-033 C 80/20 6.99 MW 6.99 MW
940541 AE2-040 C 80/20 1.24 MW 1.24 MW
940641 AE2-051 C 80/20 11.4 MW 11.4 MW
941101 AE2-104 C Adder 1.28 MW 1.09 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 11.81 MW 11.81 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 9.22 MW 9.22 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 44.44 MW 44.44 MW
NY PJM->LTFIMP_NY CLTF 0.52 MW 0.52 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.46 MW 0.46 MW
WEC LTFEXP_WEC->PJM CLTF 0.24 MW 0.24 MW
CPLE LTFEXP_CPLE->PJM CLTF 5.48 MW 5.48 MW
TVA LTFEXP_TVA->PJM CLTF 2.54 MW 2.54 MW
MEC LTFEXP_MEC->PJM CLTF 1.55 MW 1.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.27 MW 3.27 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.09 MW 0.09 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.61 MW 2.61 MW

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 271_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
DVP_P1-2: LN 271_SRT-A
CONTINGENCY 'DVP_P1-2: LN 271_SRT-A'
 OPEN BRANCH FROM BUS 314481 TO BUS 316171 CKT 1   /*6LANDSTN     230.0 - 6POCATY      230.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 107.21 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 727.63 MVA
MW Contribution: 62.99 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
313526 AB2-022 C 80/20 0.31 MW 0.31 MW
314507 3THOMPSN Adder -2.63 MW -2.24 MW
315605 6W1-029WIND 80/20 0.25 MW 0.25 MW
315611 6Z1-036WIND 80/20 0.21 MW 0.21 MW
957871 AF2-081 C 80/20 11.88 MW 11.88 MW
316185 AD1-033 C 80/20 1.75 MW 1.75 MW
316320 Y1-086 C 80/20 0.18 MW 0.18 MW
316321 Z2-027 C 80/20 0.25 MW 0.25 MW
316017 AA1-139 ULT1 80/20 1.29 MW 1.29 MW
316018 AA1-139 ULT2 80/20 1.29 MW 1.29 MW
316388 AE2-253 GEN 80/20 2.47 MW 2.47 MW
944581 AF1-123 C 80/20 63.98 MW 63.98 MW
944591 AF1-124 C 80/20 64.21 MW 64.21 MW
944601 AF1-125 C 80/20 62.99 MW 62.99 MW
938531 AE1-072 C 80/20 19.66 MW 19.66 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.07 MW 0.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.71 MW 1.71 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.78 MW 0.78 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 1.93 MW 1.93 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.12 MW 0.12 MW
VTF LTFEXP_VFT->PJM CMTX 0.32 MW 0.32 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.06 MW 0.06 MW
WEC LTFEXP_WEC->PJM CLTF 0.03 MW 0.03 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.2 MW 0.2 MW
TVA LTFEXP_TVA->PJM CLTF 0.18 MW 0.18 MW
MEC LTFEXP_MEC->PJM CLTF 0.17 MW 0.17 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.23 MW 0.23 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.1 MW 0.1 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S_SENS


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Contingency Name:
DVP_P1-2: LN 574_SRT-S_SENS
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S_SENS'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2598 BRANCH FROM BUS 314908 TO BUS 314903 CKT 1 /*8ELMONT      500.0 - 8CHCKAHM     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314918 TO BUS 314911 CKT 1 /*8NO ANNA     500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2598 BRANCH FROM BUS 314908 TO BUS 314903 CKT 1 /*8ELMONT      500.0 - 8CHCKAHM     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314918 TO BUS 314911 CKT 1 /*8NO ANNA     500.0 - 8LADYSMITH   500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 104.61 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3368.83 MVA
MW Contribution: 64.91 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.25 MW 1.06 MW
961791 AG1-021 C Adder 2.39 MW 2.03 MW
961941 AG1-037 C Adder 0.72 MW 0.61 MW
962331 AG1-082 C Adder 2.86 MW 2.44 MW
963041 AG1-153 C 80/20 8.7 MW 8.7 MW
963171 AG1-166 C Adder 1.33 MW 1.13 MW
963181 AG1-167 C Adder 1.0 MW 0.85 MW
963191 AG1-168 C Adder 1.0 MW 0.85 MW
964791 AG1-342 C Adder 4.75 MW 4.04 MW
966801 AG1-551 C Adder 2.89 MW 2.46 MW
966811 AG1-552 C Adder 2.92 MW 2.48 MW
965291 AG1-394 C Adder 1.22 MW 1.04 MW
966621 AG1-532 C Adder 2.0 MW 1.7 MW
313853 3PONTONDP Adder 0.89 MW 0.75 MW
315131 1EDGECMA Adder 20.63 MW 17.54 MW
315153 1CLOVER1 80/20 18.21 MW 18.21 MW
315154 1CLOVER2 80/20 18.04 MW 18.04 MW
934521 AD1-076 C Adder 17.34 MW 14.74 MW
944011 AF1-069 C 80/20 20.35 MW 20.35 MW
959311 AF2-222 C Adder 23.44 MW 19.92 MW
960061 AF2-297 C Adder 10.08 MW 8.56 MW
960081 AF2-299 C Adder 2.66 MW 2.27 MW
938371 AE1-056 C Adder 8.67 MW 7.37 MW
939181 AE1-148 C Adder 12.46 MW 10.59 MW
941031 AE2-094 C 80/20 62.29 MW 62.29 MW
946281 AF1-292 C Adder 2.21 MW 1.88 MW
946301 AF1-294 C Adder 4.92 MW 4.18 MW
957481 AF2-042 C 80/20 78.99 MW 78.99 MW
957521 AF2-046 C Adder 20.2 MW 17.17 MW
957861 AF2-080 C Adder 10.33 MW 8.78 MW
958211 AF2-115 C Adder 2.99 MW 2.54 MW
938771 AE1-103 C 80/20 4.21 MW 4.21 MW
313526 AB2-022 C 80/20 0.54 MW 0.54 MW
314507 3THOMPSN 80/20 2.92 MW 2.92 MW
315060 1CHESTF5 Adder 76.37 MW 64.91 MW
315065 1CHESTF6 Adder 25.69 MW 21.84 MW
315073 1STONECA Adder 8.91 MW 7.57 MW
315083 1SPRUNCA Adder 12.3 MW 10.46 MW
315084 1SPRUNCB Adder 12.3 MW 10.46 MW
315092 1YORKTN3 Adder 173.21 MW 147.23 MW
942341 AE2-247 C 80/20 2.14 MW 2.14 MW
943461 AF1-017 C 80/20 1.93 MW 1.93 MW
315098 1CHESPKA 80/20 0.63 MW 0.63 MW
315099 1CHESPKB 80/20 1.04 MW 1.04 MW
315102 1BRUNSWICKG1 80/20 12.84 MW 12.84 MW
315103 1BRUNSWICKG2 80/20 12.84 MW 12.84 MW
315104 1BRUNSWICKG3 80/20 12.84 MW 12.84 MW
315105 1BRUNSWICKS1 80/20 26.68 MW 26.68 MW
315108 1ELIZAR1 80/20 4.63 MW 4.63 MW
315109 1ELIZAR2 80/20 4.55 MW 4.55 MW
315110 1ELIZAR3 80/20 4.69 MW 4.69 MW
315233 1SURRY 2 80/20 34.31 MW 34.31 MW
315241 1Z1-086 GT1 80/20 16.43 MW 16.43 MW
315242 1Z1-086 GT2 80/20 16.42 MW 16.42 MW
315243 1Z1-086 GT3 80/20 16.42 MW 16.42 MW
315244 1Z1-086 ST 80/20 28.59 MW 28.59 MW
315260 1GOSPORTA 80/20 3.08 MW 3.08 MW
315261 1GOSPORTB 80/20 3.94 MW 3.94 MW
315262 1GOSPORTC 80/20 3.34 MW 3.34 MW
315605 6W1-029WIND 80/20 1.12 MW 1.12 MW
315611 6Z1-036WIND 80/20 0.94 MW 0.94 MW
957601 AF2-054 C Adder 2.36 MW 2.01 MW
962971 AG1-146 C Adder 3.22 MW 2.73 MW
962981 AG1-147 C Adder 7.5 MW 6.38 MW
942001 AE2-212 C Adder 2.96 MW 2.52 MW
957871 AF2-081 C 80/20 14.49 MW 14.49 MW
958161 AF2-110 C 80/20 1.97 MW 1.97 MW
926071 AC1-086 C Adder 29.52 MW 25.09 MW
927021 AC1-189 C Adder 11.38 MW 9.67 MW
936261 AD2-033 C Adder 17.84 MW 15.16 MW
933291 AC2-141 C 80/20 44.2 MW 44.2 MW
934621 AD1-088 C 80/20 18.07 MW 18.07 MW
939411 AE1-173 C 80/20 139.74 MW 139.74 MW
916191 Z1-068 C 80/20 0.06 MW 0.06 MW
933981 AD1-022 C Adder 12.4 MW 10.54 MW
961681 AG1-008 C Adder 20.2 MW 17.17 MW
962571 AG1-106 C Adder 3.82 MW 3.25 MW
316023 AB2-100 C2 80/20 1.37 MW 1.37 MW
316036 AC1-147 C 80/20 0.53 MW 0.53 MW
316072 AD1-144 C 80/20 0.4 MW 0.4 MW
316169 AC1-164 GEN Adder 44.74 MW 38.03 MW
316185 AD1-033 C 80/20 1.79 MW 1.79 MW
316233 AE1-074 C 80/20 3.77 MW 3.77 MW
316236 AE1-162 C 80/20 0.49 MW 0.49 MW
316240 AF1-291 C Adder 2.86 MW 2.43 MW
316246 AF1-032 C 80/20 0.41 MW 0.41 MW
316258 AE1-075 C 80/20 0.5 MW 0.5 MW
316263 AC1-034 C Adder 8.89 MW 7.56 MW
316274 AC1-208 C Adder 13.23 MW 11.24 MW
316294 AC1-161 C 80/20 7.22 MW 7.22 MW
316305 AF2-043 C 80/20 0.5 MW 0.5 MW
316313 AB2-026 C 80/20 0.55 MW 0.55 MW
316315 AB2-025 C 80/20 0.6 MW 0.6 MW
316316 AC1-027 C 80/20 0.46 MW 0.46 MW
316320 Y1-086 C 80/20 0.32 MW 0.32 MW
316321 Z2-027 C 80/20 0.53 MW 0.53 MW
316336 AC2-165 C Adder 13.69 MW 11.64 MW
316365 AB2-100 C1 80/20 1.37 MW 1.37 MW
316405 AF2-144 C 80/20 0.43 MW 0.43 MW
316017 AA1-139 ULT1 80/20 1.57 MW 1.57 MW
316018 AA1-139 ULT2 80/20 1.57 MW 1.57 MW
316083 AB2-161 C 80/20 0.78 MW 0.78 MW
316375 AC2-012 C 80/20 1.95 MW 1.95 MW
316311 AC2-079 C 80/20 8.22 MW 8.22 MW
316381 AD1-082 C 80/20 1.79 MW 1.79 MW
316349 AD2-085 C 80/20 4.93 MW 4.93 MW
316388 AE2-253 GEN 80/20 2.85 MW 2.85 MW
961611 AG1-000B C Adder 21.63 MW 18.38 MW
941591 AE2-156 C 80/20 25.9 MW 25.9 MW
944581 AF1-123 C 80/20 65.92 MW 65.92 MW
944591 AF1-124 C 80/20 66.16 MW 66.16 MW
944601 AF1-125 C 80/20 64.91 MW 64.91 MW
944631 AF1-128 C Adder 47.78 MW 40.62 MW
962491 AG1-098 C 80/20 16.16 MW 16.16 MW
962561 AG1-105 C Adder 12.0 MW 10.2 MW
964241 AG1-285 C Adder 18.19 MW 15.46 MW
965281 AG1-393 C Adder 2.89 MW 2.46 MW
313764 3SOCKMAN Adder 1.01 MW 0.86 MW
934321 AD1-056 C Adder 8.52 MW 7.24 MW
934331 AD1-057 C Adder 4.75 MW 4.04 MW
934501 AD1-074 C Adder 47.76 MW 40.59 MW
934511 AD1-075 C Adder 11.94 MW 10.15 MW
934611 AD1-087 C 80/20 1.79 MW 1.79 MW
935161 AD1-151 C Adder 21.37 MW 18.16 MW
937481 AD2-202 C 80/20 0.52 MW 0.52 MW
938531 AE1-072 C 80/20 25.46 MW 25.46 MW
939191 AE1-149 C 80/20 15.1 MW 15.1 MW
940431 AE2-027 C Adder 17.19 MW 14.61 MW
940481 AE2-033 C 80/20 23.6 MW 23.6 MW
940541 AE2-040 C 80/20 4.2 MW 4.2 MW
940551 AE2-041 C Adder 7.91 MW 6.73 MW
940641 AE2-051 C 80/20 27.15 MW 27.15 MW
941101 AE2-104 C 80/20 4.83 MW 4.83 MW
942461 AE2-259 C Adder 12.88 MW 10.95 MW
943471 AF1-018 C Adder 7.91 MW 6.73 MW
944641 AF1-129 C Adder 133.99 MW 113.89 MW
316303 AF2-085 80/20 6.37 MW 6.37 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 37.93 MW 37.93 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 27.88 MW 27.88 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 123.76 MW 123.76 MW
NY PJM->LTFIMP_NY CLTF 2.48 MW 2.48 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.51 MW 1.51 MW
WEC LTFEXP_WEC->PJM CLTF 0.79 MW 0.79 MW
CPLE LTFEXP_CPLE->PJM CLTF 15.06 MW 15.06 MW
TVA LTFEXP_TVA->PJM CLTF 7.58 MW 7.58 MW
MEC LTFEXP_MEC->PJM CLTF 4.84 MW 4.84 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.66 MW 9.66 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.3 MW 0.3 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.18 MW 7.18 MW

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2240_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
DVP_P1-2: LN 2240_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2240_SRT-A'
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1   /*6FENTRES     230.0 - 6POCATY      230.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 104.23 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 707.41 MVA
MW Contribution: 63.02 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
313526 AB2-022 C 80/20 0.31 MW 0.31 MW
314507 3THOMPSN Adder -2.63 MW -2.24 MW
315605 6W1-029WIND 80/20 0.25 MW 0.25 MW
315611 6Z1-036WIND 80/20 0.21 MW 0.21 MW
957871 AF2-081 C 80/20 11.89 MW 11.89 MW
316320 Y1-086 C 80/20 0.18 MW 0.18 MW
316321 Z2-027 C 80/20 0.25 MW 0.25 MW
316017 AA1-139 ULT1 80/20 1.29 MW 1.29 MW
316018 AA1-139 ULT2 80/20 1.29 MW 1.29 MW
316388 AE2-253 GEN 80/20 2.47 MW 2.47 MW
944581 AF1-123 C 80/20 64.01 MW 64.01 MW
944591 AF1-124 C 80/20 64.24 MW 64.24 MW
944601 AF1-125 C 80/20 63.02 MW 63.02 MW
938531 AE1-072 C 80/20 19.67 MW 19.67 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.09 MW 0.09 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.92 MW 1.92 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.86 MW 0.86 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 2.06 MW 2.06 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.15 MW 0.15 MW
VTF LTFEXP_VFT->PJM CMTX 0.41 MW 0.41 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.07 MW 0.07 MW
WEC LTFEXP_WEC->PJM CLTF 0.04 MW 0.04 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.21 MW 0.21 MW
TVA LTFEXP_TVA->PJM CLTF 0.2 MW 0.2 MW
MEC LTFEXP_MEC->PJM CLTF 0.19 MW 0.19 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.25 MW 0.25 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.1 MW 0.1 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Contingency Name:
DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A
CONTINGENCY 'DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A'
 OPEN BRANCH FROM BUS 314218 TO BUS 314196 CKT 1   /*6ELMONT      230.0 - 6LADYSMITH   230.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1   /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 109.61 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4318.45 MVA
MW Contribution: 233.91 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 9.27 MW 9.27 MW
963042 AG1-153 E 50/50 13.9 MW 13.9 MW
965291 AG1-394 C Adder 1.33 MW 1.13 MW
965292 AG1-394 E Adder 2.45 MW 2.08 MW
966621 AG1-532 C Adder 2.17 MW 1.84 MW
966622 AG1-532 E Adder 1.44 MW 1.23 MW
314541 3WATKINS Adder 1.08 MW 0.92 MW
314572 3EMPORIA Adder 0.67 MW 0.57 MW
920042 AA2-088 E OP Adder 16.53 MW 14.05 MW
934521 AD1-076 C Adder 18.92 MW 16.08 MW
944011 AF1-069 C 50/50 21.67 MW 21.67 MW
944012 AF1-069 E 50/50 8.42 MW 8.42 MW
960081 AF2-299 C Adder 2.89 MW 2.46 MW
960082 AF2-299 E Adder 1.93 MW 1.64 MW
900672 V4-068 E Adder 0.55 MW 0.47 MW
923573 AB1-173 E OP Adder 5.06 MW 4.3 MW
940492 AE2-034 E Adder 4.8 MW 4.08 MW
941031 AE2-094 C 50/50 66.32 MW 66.32 MW
941032 AE2-094 E 50/50 29.7 MW 29.7 MW
946281 AF1-292 C Adder 2.39 MW 2.03 MW
946282 AF1-292 E Adder 1.6 MW 1.36 MW
957481 AF2-042 C Adder 84.36 MW 71.7 MW
957482 AF2-042 E Adder 56.24 MW 47.8 MW
957521 AF2-046 C Adder 22.01 MW 18.71 MW
957522 AF2-046 E Adder 11.12 MW 9.45 MW
314539 3UNCAMP Adder 9.54 MW 8.11 MW
916042 Z1-036 E Adder 44.79 MW 38.07 MW
938771 AE1-103 C Adder 4.6 MW 3.91 MW
938772 AE1-103 E Adder 6.36 MW 5.4 MW
314331 6POE 50/50 2.17 MW 2.17 MW
314507 3THOMPSN Adder 3.2 MW 2.72 MW
314525 6KINGFORK Adder 1.59 MW 1.35 MW
314550 6HICKORY 50/50 3.47 MW 3.47 MW
315065 1CHESTF6 Adder 29.33 MW 24.93 MW
315073 1STONECA Adder 10.16 MW 8.63 MW
315083 1SPRUNCA Adder 14.01 MW 11.9 MW
315084 1SPRUNCB Adder 14.01 MW 11.9 MW
315092 1YORKTN3 Adder 193.91 MW 164.82 MW
926662 AC1-147 E Adder 2.1 MW 1.79 MW
926755 AC1-161 E 50/50 20.66 MW 20.66 MW
927226 AC1-216 E Adder 11.59 MW 9.86 MW
935112 AD1-144 E Adder 1.48 MW 1.25 MW
942341 AE2-247 C Adder 2.35 MW 2.0 MW
942342 AE2-247 E Adder 3.25 MW 2.76 MW
943461 AF1-017 C Adder 2.13 MW 1.81 MW
943462 AF1-017 E Adder 3.47 MW 2.95 MW
943612 AF1-032 E Adder 1.46 MW 1.24 MW
958502 AF2-144 E Adder 1.89 MW 1.61 MW
315102 1BRUNSWICKG1 50/50 13.68 MW 13.68 MW
315103 1BRUNSWICKG2 50/50 13.68 MW 13.68 MW
315104 1BRUNSWICKG3 50/50 13.68 MW 13.68 MW
315105 1BRUNSWICKS1 50/50 28.42 MW 28.42 MW
315108 1ELIZAR1 50/50 5.08 MW 5.08 MW
315109 1ELIZAR2 50/50 5.0 MW 5.0 MW
315110 1ELIZAR3 50/50 5.15 MW 5.15 MW
315241 1Z1-086 GT1 50/50 17.49 MW 17.49 MW
315242 1Z1-086 GT2 50/50 17.49 MW 17.49 MW
315243 1Z1-086 GT3 50/50 17.49 MW 17.49 MW
315244 1Z1-086 ST 50/50 30.45 MW 30.45 MW
315260 1GOSPORTA Adder 3.38 MW 2.87 MW
315261 1GOSPORTB Adder 4.32 MW 3.67 MW
315262 1GOSPORTC Adder 3.67 MW 3.12 MW
913392 Y1-086 E Adder 3.48 MW 2.96 MW
916192 Z1-068 E 50/50 2.99 MW 2.99 MW
923832 AB2-022 E Adder 1.96 MW 1.67 MW
923852 AB2-025 E 50/50 1.85 MW 1.85 MW
923862 AB2-026 E Adder 1.92 MW 1.63 MW
938552 AE1-074 E 50/50 2.1 MW 2.1 MW
938562 AE1-075 E Adder 1.64 MW 1.39 MW
939312 AE1-162 E Adder 2.22 MW 1.89 MW
946262 AF1-291 E Adder 2.17 MW 1.84 MW
957492 AF2-043 E Adder 2.25 MW 1.91 MW
901082 W1-029 E Adder 50.27 MW 42.73 MW
917122 Z2-027 E Adder 2.12 MW 1.8 MW
925332 AB2-190 E Adder 12.02 MW 10.22 MW
925522 AC1-027 E 50/50 1.94 MW 1.94 MW
942001 AE2-212 C Adder 3.33 MW 2.83 MW
942002 AE2-212 E Adder 2.22 MW 1.89 MW
957871 AF2-081 C Adder 15.87 MW 13.49 MW
957872 AF2-081 E Adder 6.8 MW 5.78 MW
958161 AF2-110 C Adder 2.16 MW 1.84 MW
958162 AF2-110 E Adder 3.44 MW 2.92 MW
933291 AC2-141 C 50/50 48.39 MW 48.39 MW
933292 AC2-141 E 50/50 20.66 MW 20.66 MW
934621 AD1-088 C Adder 19.33 MW 16.43 MW
934622 AD1-088 E Adder 9.1 MW 7.73 MW
939411 AE1-173 C 50/50 150.23 MW 150.23 MW
939412 AE1-173 E 50/50 100.15 MW 100.15 MW
934012 AD1-025 E Adder 15.01 MW 12.76 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
961681 AG1-008 C Adder 22.01 MW 18.71 MW
961682 AG1-008 E Adder 11.12 MW 9.45 MW
314594 6PLYMOUTH TP Adder 0.5 MW 0.42 MW
314632 6AYDLETT TAP Adder 2.15 MW 1.83 MW
316185 AD1-033 C 50/50 1.96 MW 1.96 MW
316233 AE1-074 C 50/50 4.17 MW 4.17 MW
316240 AF1-291 C Adder 3.25 MW 2.76 MW
316294 AC1-161 C 50/50 7.91 MW 7.91 MW
316315 AB2-025 C 50/50 0.65 MW 0.65 MW
316316 AC1-027 C 50/50 0.5 MW 0.5 MW
924516 AB2-100 E1 Adder 4.5 MW 3.82 MW
924517 AB2-100 E2 Adder 4.5 MW 3.82 MW
934065 AD1-033 E 50/50 7.98 MW 7.98 MW
937226 AE2-253 E Adder 9.28 MW 7.89 MW
919153 AA1-139 E2 Adder 6.49 MW 5.52 MW
919152 AA1-139 E1 Adder 6.49 MW 5.52 MW
920692 AA2-178 E Adder 6.39 MW 5.43 MW
923994 AB2-040_E Adder 9.5 MW 8.07 MW
924814 AB2-134 E Adder 18.99 MW 16.14 MW
316084 AB2-161 E Adder 8.69 MW 7.38 MW
316088 AB2-174 E Adder 10.07 MW 8.56 MW
316375 AC2-012 C 50/50 2.15 MW 2.15 MW
932046 AC2-012 E 50/50 20.8 MW 20.8 MW
316311 AC2-079 C Adder 9.05 MW 7.69 MW
932596 AC2-079 E Adder 14.76 MW 12.55 MW
934576 AD1-082 E Adder 6.92 MW 5.88 MW
316349 AD2-085 C Adder 5.43 MW 4.62 MW
936666 AD2-085 E Adder 8.86 MW 7.53 MW
961611 AG1-000B C Adder 24.18 MW 20.56 MW
941591 AE2-156 C 50/50 28.43 MW 28.43 MW
944581 AF1-123 C 50/50 72.23 MW 72.23 MW
944582 AF1-123 E 50/50 165.39 MW 165.39 MW
944591 AF1-124 C 50/50 72.48 MW 72.48 MW
944592 AF1-124 E 50/50 165.99 MW 165.99 MW
944601 AF1-125 C 50/50 71.11 MW 71.11 MW
944602 AF1-125 E 50/50 162.79 MW 162.79 MW
962491 AG1-098 C Adder 17.29 MW 14.7 MW
962492 AG1-098 E Adder 11.53 MW 9.8 MW
965281 AG1-393 C Adder 3.27 MW 2.78 MW
965282 AG1-393 E Adder 2.18 MW 1.85 MW
934501 AD1-074 C Adder 52.1 MW 44.29 MW
934502 AD1-074 E Adder 26.52 MW 22.55 MW
934612 AD1-087 E Adder 5.53 MW 4.7 MW
935161 AD1-151 C Adder 24.12 MW 20.5 MW
935162 AD1-151 E Adder 16.08 MW 13.67 MW
937482 AD2-202 E Adder 1.62 MW 1.38 MW
938531 AE1-072 C Adder 27.89 MW 23.7 MW
938532 AE1-072 E Adder 14.54 MW 12.36 MW
939191 AE1-149 C Adder 16.81 MW 14.29 MW
939192 AE1-149 E Adder 11.21 MW 9.53 MW
940431 AE2-027 C Adder 19.49 MW 16.56 MW
940432 AE2-027 E Adder 12.99 MW 11.04 MW
940481 AE2-033 C 50/50 25.66 MW 25.66 MW
940482 AE2-033 E 50/50 17.3 MW 17.3 MW
940541 AE2-040 C 50/50 4.57 MW 4.57 MW
940641 AE2-051 C 50/50 29.03 MW 29.03 MW
940642 AE2-051 E 50/50 19.35 MW 19.35 MW
941101 AE2-104 C Adder 5.3 MW 4.5 MW
941102 AE2-104 E Adder 8.43 MW 7.16 MW
944641 AF1-129 C Adder 152.97 MW 130.02 MW
316303 AF2-085 50/50 6.88 MW 6.88 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 41.29 MW 41.29 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 30.19 MW 30.19 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 133.16 MW 133.16 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.92 MW 5.92 MW
NY PJM->LTFIMP_NY CLTF 2.73 MW 2.73 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.65 MW 1.65 MW
WEC LTFEXP_WEC->PJM CLTF 0.86 MW 0.86 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.19 MW 16.19 MW
TVA LTFEXP_TVA->PJM CLTF 8.2 MW 8.2 MW
MEC LTFEXP_MEC->PJM CLTF 5.26 MW 5.26 MW
LAGN LTFEXP_LAGN->PJM CLTF 10.44 MW 10.44 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.32 MW 0.32 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 37.64 MW 37.64 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.72 MW 7.72 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Contingency Name:
DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A
CONTINGENCY 'DVP_P7-1: ELMONT-LADYSMITH_500_230_SRT-A'
 OPEN BRANCH FROM BUS 314218 TO BUS 314196 CKT 1   /*6ELMONT      230.0 - 6LADYSMITH   230.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1   /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 105.56 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4158.88 MVA
MW Contribution: 206.19 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.7 MW 0.59 MW
961942 AG1-037 E Adder 0.46 MW 0.4 MW
962331 AG1-082 C Adder 2.79 MW 2.37 MW
962332 AG1-082 E Adder 1.86 MW 1.58 MW
963041 AG1-153 C 50/50 9.53 MW 9.53 MW
963042 AG1-153 E 50/50 14.3 MW 14.3 MW
964791 AG1-342 C Adder 4.71 MW 4.0 MW
964792 AG1-342 E Adder 3.14 MW 2.67 MW
966801 AG1-551 C Adder 2.86 MW 2.43 MW
966802 AG1-551 E Adder 1.51 MW 1.28 MW
966811 AG1-552 C Adder 2.86 MW 2.43 MW
966812 AG1-552 E Adder 1.36 MW 1.15 MW
965291 AG1-394 C Adder 1.18 MW 1.0 MW
965292 AG1-394 E Adder 2.17 MW 1.84 MW
966621 AG1-532 C Adder 1.95 MW 1.66 MW
966622 AG1-532 E Adder 1.3 MW 1.1 MW
314541 3WATKINS Adder 0.95 MW 0.81 MW
314572 3EMPORIA Adder 0.6 MW 0.51 MW
315153 1CLOVER1 50/50 18.69 MW 18.69 MW
315154 1CLOVER2 50/50 18.52 MW 18.52 MW
918492 AA1-063AE OP Adder 5.66 MW 4.81 MW
918532 AA1-067 E Adder 0.97 MW 0.82 MW
919692 AA2-053 E OP Adder 5.87 MW 4.99 MW
920042 AA2-088 E OP Adder 14.65 MW 12.45 MW
925785 AC1-054 E Adder 4.73 MW 4.02 MW
926274 AC1-105 E Adder 3.54 MW 3.01 MW
927146 AC1-208 E Adder 5.74 MW 4.88 MW
934521 AD1-076 C Adder 16.89 MW 14.36 MW
934522 AD1-076 E Adder 8.61 MW 7.32 MW
943172 AE2-346 E Adder 0.84 MW 0.71 MW
943902 AF1-058 E Adder 1.69 MW 1.44 MW
944011 AF1-069 C 50/50 22.43 MW 22.43 MW
944012 AF1-069 E 50/50 8.71 MW 8.71 MW
959311 AF2-222 C Adder 21.48 MW 18.26 MW
959312 AF2-222 E Adder 14.39 MW 12.23 MW
960061 AF2-297 C Adder 10.15 MW 8.63 MW
960062 AF2-297 E Adder 6.77 MW 5.75 MW
960081 AF2-299 C Adder 2.6 MW 2.21 MW
960082 AF2-299 E Adder 1.73 MW 1.47 MW
316141 AB2-099 E Adder 0.35 MW 0.3 MW
900672 V4-068 E Adder 0.49 MW 0.42 MW
917342 Z2-044 E Adder 0.89 MW 0.75 MW
923263 AB1-132 E OP Adder 8.43 MW 7.16 MW
923573 AB1-173 E OP Adder 4.56 MW 3.88 MW
924162 AB2-060 E OP Adder 5.78 MW 4.91 MW
924302 AB2-077 E O1 Adder 1.82 MW 1.54 MW
924312 AB2-078 E O1 Adder 1.82 MW 1.54 MW
924322 AB2-079 E O1 Adder 1.82 MW 1.54 MW
925612 AC1-036 E Adder 1.12 MW 0.95 MW
939181 AE1-148 C Adder 12.3 MW 10.46 MW
939182 AE1-148 E Adder 8.2 MW 6.97 MW
940492 AE2-034 E Adder 4.26 MW 3.62 MW
941031 AE2-094 C 50/50 68.64 MW 68.64 MW
941032 AE2-094 E 50/50 30.74 MW 30.74 MW
946281 AF1-292 C Adder 2.15 MW 1.83 MW
946282 AF1-292 E Adder 1.44 MW 1.22 MW
957481 AF2-042 C 50/50 81.96 MW 81.96 MW
957482 AF2-042 E 50/50 54.64 MW 54.64 MW
957521 AF2-046 C Adder 19.61 MW 16.67 MW
957522 AF2-046 E Adder 9.91 MW 8.42 MW
957861 AF2-080 C Adder 10.3 MW 8.75 MW
957862 AF2-080 E Adder 4.56 MW 3.88 MW
314539 3UNCAMP Adder 8.35 MW 7.1 MW
916042 Z1-036 E Adder 39.63 MW 33.68 MW
938771 AE1-103 C Adder 4.02 MW 3.42 MW
938772 AE1-103 E Adder 5.55 MW 4.72 MW
313526 AB2-022 C 50/50 0.53 MW 0.53 MW
314331 6POE Adder 1.66 MW 1.41 MW
314507 3THOMPSN Adder 2.79 MW 2.37 MW
314525 6KINGFORK Adder 1.35 MW 1.15 MW
314550 6HICKORY 50/50 3.06 MW 3.06 MW
926662 AC1-147 E Adder 1.83 MW 1.55 MW
926755 AC1-161 E 50/50 18.47 MW 18.47 MW
935112 AD1-144 E Adder 1.25 MW 1.06 MW
942341 AE2-247 C Adder 1.95 MW 1.66 MW
942342 AE2-247 E Adder 2.7 MW 2.29 MW
943461 AF1-017 C Adder 1.77 MW 1.5 MW
943462 AF1-017 E Adder 2.88 MW 2.45 MW
943612 AF1-032 E Adder 1.28 MW 1.09 MW
315102 1BRUNSWICKG1 50/50 14.07 MW 14.07 MW
315103 1BRUNSWICKG2 50/50 14.07 MW 14.07 MW
315104 1BRUNSWICKG3 50/50 14.07 MW 14.07 MW
315105 1BRUNSWICKS1 50/50 29.23 MW 29.23 MW
315108 1ELIZAR1 50/50 4.43 MW 4.43 MW
315109 1ELIZAR2 50/50 4.35 MW 4.35 MW
315110 1ELIZAR3 50/50 4.49 MW 4.49 MW
315241 1Z1-086 GT1 50/50 18.03 MW 18.03 MW
315242 1Z1-086 GT2 50/50 18.02 MW 18.02 MW
315243 1Z1-086 GT3 50/50 18.02 MW 18.02 MW
315244 1Z1-086 ST 50/50 31.38 MW 31.38 MW
315260 1GOSPORTA Adder 2.94 MW 2.5 MW
315261 1GOSPORTB Adder 3.76 MW 3.19 MW
315262 1GOSPORTC Adder 3.19 MW 2.71 MW
913392 Y1-086 E 50/50 3.06 MW 3.06 MW
916192 Z1-068 E 50/50 2.62 MW 2.62 MW
923832 AB2-022 E 50/50 1.73 MW 1.73 MW
923852 AB2-025 E 50/50 1.65 MW 1.65 MW
939312 AE1-162 E Adder 1.78 MW 1.51 MW
957492 AF2-043 E Adder 1.96 MW 1.67 MW
901082 W1-029 E Adder 44.24 MW 37.6 MW
917122 Z2-027 E Adder 1.87 MW 1.59 MW
925522 AC1-027 E 50/50 1.69 MW 1.69 MW
957871 AF2-081 C 50/50 13.99 MW 13.99 MW
957872 AF2-081 E 50/50 5.99 MW 5.99 MW
958161 AF2-110 C Adder 1.86 MW 1.58 MW
958162 AF2-110 E Adder 2.97 MW 2.52 MW
314722 3TWITTYS Adder 1.25 MW 1.06 MW
917512 Z2-088 E OP1 Adder 6.58 MW 5.59 MW
926071 AC1-086 C Adder 28.96 MW 24.61 MW
926072 AC1-086 E Adder 13.18 MW 11.2 MW
927021 AC1-189 C Adder 11.34 MW 9.64 MW
927022 AC1-189 E Adder 5.65 MW 4.8 MW
936261 AD2-033 C Adder 16.34 MW 13.89 MW
936262 AD2-033 E Adder 2.66 MW 2.26 MW
933291 AC2-141 C 50/50 43.28 MW 43.28 MW
933292 AC2-141 E 50/50 18.47 MW 18.47 MW
934621 AD1-088 C 50/50 18.04 MW 18.04 MW
934622 AD1-088 E 50/50 8.49 MW 8.49 MW
939411 AE1-173 C 50/50 148.04 MW 148.04 MW
939412 AE1-173 E 50/50 98.69 MW 98.69 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
933981 AD1-022 C Adder 12.08 MW 10.27 MW
933982 AD1-022 E Adder 6.58 MW 5.59 MW
962572 AG1-106 E Adder 1.64 MW 1.39 MW
961681 AG1-008 C Adder 19.61 MW 16.67 MW
961682 AG1-008 E Adder 9.91 MW 8.42 MW
962571 AG1-106 C Adder 3.75 MW 3.18 MW
314594 6PLYMOUTH TP Adder 0.45 MW 0.38 MW
314632 6AYDLETT TAP 50/50 1.9 MW 1.9 MW
316185 AD1-033 C 50/50 1.72 MW 1.72 MW
316274 AC1-208 C Adder 12.93 MW 10.99 MW
316294 AC1-161 C 50/50 7.07 MW 7.07 MW
316315 AB2-025 C 50/50 0.58 MW 0.58 MW
316316 AC1-027 C 50/50 0.44 MW 0.44 MW
316320 Y1-086 C 50/50 0.31 MW 0.31 MW
917332 KELFORD E Adder 2.3 MW 1.96 MW
924516 AB2-100 E1 Adder 4.04 MW 3.44 MW
924517 AB2-100 E2 Adder 4.04 MW 3.44 MW
926206 AC1-098 E Adder 5.22 MW 4.44 MW
926214 AC1-099 E Adder 1.73 MW 1.47 MW
934065 AD1-033 E 50/50 7.03 MW 7.03 MW
937226 AE2-253 E 50/50 8.18 MW 8.18 MW
918512 AA1-065 E OP Adder 7.61 MW 6.47 MW
316017 AA1-139 ULT1 50/50 1.51 MW 1.51 MW
316018 AA1-139 ULT2 50/50 1.51 MW 1.51 MW
919153 AA1-139 E2 50/50 5.72 MW 5.72 MW
919152 AA1-139 E1 50/50 5.72 MW 5.72 MW
919710 AA2-057 E Adder 5.81 MW 4.94 MW
920692 AA2-178 E Adder 5.68 MW 4.83 MW
923994 AB2-040_E Adder 8.56 MW 7.27 MW
924022 AB2-043 E O1 Adder 7.04 MW 5.99 MW
316084 AB2-161 E Adder 6.78 MW 5.76 MW
925122 AB2-169 E Adder 7.87 MW 6.69 MW
316088 AB2-174 E Adder 9.07 MW 7.71 MW
932046 AC2-012 E Adder 18.08 MW 15.37 MW
316311 AC2-079 C Adder 7.55 MW 6.42 MW
932596 AC2-079 E Adder 12.32 MW 10.47 MW
934576 AD1-082 E Adder 5.4 MW 4.59 MW
316349 AD2-085 C Adder 4.51 MW 3.83 MW
936666 AD2-085 E Adder 7.35 MW 6.25 MW
316388 AE2-253 GEN 50/50 2.75 MW 2.75 MW
941591 AE2-156 C 50/50 24.73 MW 24.73 MW
944581 AF1-123 C 50/50 63.67 MW 63.67 MW
944582 AF1-123 E 50/50 145.79 MW 145.79 MW
944591 AF1-124 C 50/50 63.89 MW 63.89 MW
944592 AF1-124 E 50/50 146.32 MW 146.32 MW
944601 AF1-125 C 50/50 62.69 MW 62.69 MW
944602 AF1-125 E 50/50 143.5 MW 143.5 MW
962491 AG1-098 C 50/50 16.0 MW 16.0 MW
962492 AG1-098 E 50/50 10.67 MW 10.67 MW
962561 AG1-105 C Adder 11.85 MW 10.07 MW
962562 AG1-105 E Adder 7.9 MW 6.72 MW
964241 AG1-285 C Adder 17.71 MW 15.05 MW
964242 AG1-285 E Adder 11.81 MW 10.04 MW
313764 3SOCKMAN Adder 0.99 MW 0.84 MW
932632 AC2-084 E Adder 4.62 MW 3.92 MW
934321 AD1-056 C Adder 8.47 MW 7.2 MW
934322 AD1-056 E Adder 4.6 MW 3.91 MW
934331 AD1-057 C Adder 4.73 MW 4.02 MW
934332 AD1-057 E Adder 2.46 MW 2.09 MW
934501 AD1-074 C Adder 46.5 MW 39.53 MW
934502 AD1-074 E Adder 23.67 MW 20.12 MW
934511 AD1-075 C Adder 11.63 MW 9.88 MW
934512 AD1-075 E Adder 5.92 MW 5.03 MW
934611 AD1-087 C 50/50 1.84 MW 1.84 MW
934612 AD1-087 E 50/50 5.31 MW 5.31 MW
935172 AD1-152 E Adder 7.79 MW 6.62 MW
937481 AD2-202 C 50/50 0.53 MW 0.53 MW
937482 AD2-202 E 50/50 1.55 MW 1.55 MW
938531 AE1-072 C 50/50 24.58 MW 24.58 MW
938532 AE1-072 E 50/50 12.81 MW 12.81 MW
940481 AE2-033 C 50/50 22.94 MW 22.94 MW
940482 AE2-033 E 50/50 15.47 MW 15.47 MW
940541 AE2-040 C 50/50 4.08 MW 4.08 MW
940641 AE2-051 C 50/50 29.5 MW 29.5 MW
940642 AE2-051 E 50/50 19.67 MW 19.67 MW
941101 AE2-104 C Adder 4.57 MW 3.88 MW
941102 AE2-104 E Adder 7.27 MW 6.18 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 37.48 MW 37.48 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 28.0 MW 28.0 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 127.4 MW 127.4 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.78 MW 4.78 MW
NY PJM->LTFIMP_NY CLTF 2.22 MW 2.22 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.48 MW 1.48 MW
WEC LTFEXP_WEC->PJM CLTF 0.78 MW 0.78 MW
CPLE LTFEXP_CPLE->PJM CLTF 15.57 MW 15.57 MW
TVA LTFEXP_TVA->PJM CLTF 7.65 MW 7.65 MW
MEC LTFEXP_MEC->PJM CLTF 4.82 MW 4.82 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.76 MW 9.76 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.29 MW 0.29 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 30.41 MW 30.41 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.42 MW 7.42 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P1-2: LN 575_SRT-S
CONTINGENCY 'DVP_P1-2: LN 575_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1                /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Single AC 122.94 % 3220.44 B 3959.17 39.32
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Single AC 122.77 % 3220.44 B 3953.87 49.47
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Single AC 120.01 % 3220.44 B 3864.83 67.94
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P1-2: LN 575_SRT-S
CONTINGENCY 'DVP_P1-2: LN 575_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1                /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Single AC 118.84 % 3220.44 B 3827.26 40.3
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 117.57 % 3220.44 B 3786.34 50.51
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 113.8 % 4070.2 B 4632.05 79.0
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P1-2: LN 594_SRT-S
CONTINGENCY 'DVP_P1-2: LN 594_SRT-S'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Single AC 113.06 % 3220.44 B 3640.94 31.58
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P1-2: LN 573_SRT-A
CONTINGENCY 'DVP_P1-2: LN 573_SRT-A'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Single AC 111.16 % 3220.44 B 3579.93 33.6
DVP 6FOUR RIVERS-6STJOHN 230.0 kV Ckt 1 line
314212 to 314150 ckt 1
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Single AC 108.9 % 1123.3 B 1223.33 20.38
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Single AC 103.22 % 3220.44 B 3324.19 61.0
DVP 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 102.06 % 3220.44 B 3286.74 39.21
DVP 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Single AC 101.34 % 3220.44 B 3263.68 39.09
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Single AC 100.88 % 4070.2 B 4105.97 68.23
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P4-2: H2T574_SRT-S
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 117.91 % 3940.0 C 4645.73 225.91
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P4-2: 568T575_SRT-A
CONTINGENCY 'DVP_P4-2: 568T575_SRT-A'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 117.71 % 3940.0 C 4637.69 137.3
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P4-2: H2T574_SRT-S
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 115.67 % 3940.0 C 4557.54 202.0
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P4-2: SPOTS H1T594_SRT-S
CONTINGENCY 'DVP_P4-2: SPOTS H1T594_SRT-S'
 OPEN BRANCH FROM BUS 314755 TO BUS 314934 CKT 1                /*3SPOTSYL     115.0 - 8SPOTSYL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Breaker AC 112.93 % 3940.0 C 4449.5 109.76
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P4-2: 568T575_SRT-A
CONTINGENCY 'DVP_P4-2: 568T575_SRT-A'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 112.18 % 3940.0 C 4419.9 139.5
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P4-2: 57602_SRT-S
CONTINGENCY 'DVP_P4-2: 57602_SRT-S'
 OPEN BRANCH FROM BUS 314232 TO BUS 314918 CKT 1                /*6NO ANNA     230.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314918 TO BUS 314934 CKT 1 /*8NO ANNA     500.0 - 8SPOTSYL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314918 TO BUS 314934 CKT 1 /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Breaker AC 111.72 % 5011.0 C 5598.44 259.75
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P4-2: H1T594_SRT-S
CONTINGENCY 'DVP_P4-2: H1T594_SRT-S'
 OPEN BRANCH FROM BUS 314063 TO BUS 314916 CKT 1                /*6MORRSVL     230.0 - 8MORRSVL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 OPEN BUS 314897                                                /*8MORRS_1     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Breaker AC 108.64 % 3940.0 C 4280.5 104.14
DVP 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
DVP_P4-2: 545T552_SRT-S
CONTINGENCY 'DVP_P4-2: 545T552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314916 CKT 1                /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314934 CKT 1 /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314934 CKT 1 /*8MORRSVL     500.0 - 8SPOTSYL     500.0
END
Breaker AC 108.29 % 3940.0 C 4266.74 134.28
DVP 8OX-8CLIFTON 500.0 kV Ckt 1 line
314919 to 314904 ckt 1
DVP_P7-1: LN 2101-569_SRT-S
CONTINGENCY 'DVP_P7-1: LN 2101-569_SRT-S'
 OPEN BRANCH FROM BUS 313712 TO BUS 313716 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL DP  230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314119 CKT 1                /*6VINTHIL TP  230.0 - 6NOKESVL     230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314125 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL     230.0
 OPEN BRANCH FROM BUS 314119 TO BUS 314130 CKT 1                /*6NOKESVL     230.0 - 6BRISTER     230.0
 OPEN BRANCH FROM BUS 314913 TO BUS 314916 CKT 1                /*8LOUDOUN     500.0 - 8MORRSVL     500.0
 OPEN BUS 313712                                                /*6VINTHIL TP  230.0
 OPEN BUS 313716                                                /*6VINTHIL DP  230.0
 OPEN BUS 314119                                                /*6NOKESVL     230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Tower AC 105.67 % 3144.0 C 3322.12 96.01

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 575_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
Contingency Name:
DVP_P1-2: LN 575_SRT-S
CONTINGENCY 'DVP_P1-2: LN 575_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1                /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 122.94 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3959.17 MVA
MW Contribution: 39.32 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.81 MW 0.69 MW
961791 AG1-021 C Adder 1.58 MW 1.34 MW
961941 AG1-037 C Adder 0.44 MW 0.38 MW
962331 AG1-082 C Adder 1.77 MW 1.5 MW
963041 AG1-153 C 80/20 5.54 MW 5.54 MW
963171 AG1-166 C Adder 0.88 MW 0.75 MW
963181 AG1-167 C Adder 0.66 MW 0.56 MW
963191 AG1-168 C Adder 0.66 MW 0.56 MW
964791 AG1-342 C Adder 3.07 MW 2.61 MW
966801 AG1-551 C Adder 1.82 MW 1.55 MW
966811 AG1-552 C Adder 1.82 MW 1.54 MW
965291 AG1-394 C Adder 0.75 MW 0.64 MW
966621 AG1-532 C Adder 1.26 MW 1.07 MW
313853 3PONTONDP Adder 0.59 MW 0.5 MW
315131 1EDGECMA Adder 13.29 MW 11.3 MW
315153 1CLOVER1 80/20 11.78 MW 11.78 MW
315154 1CLOVER2 80/20 11.67 MW 11.67 MW
934521 AD1-076 C Adder 10.68 MW 9.08 MW
944011 AF1-069 C 80/20 13.04 MW 13.04 MW
959311 AF2-222 C Adder 14.69 MW 12.48 MW
960061 AF2-297 C Adder 6.63 MW 5.63 MW
960081 AF2-299 C Adder 1.67 MW 1.42 MW
938371 AE1-056 C Adder 5.68 MW 4.83 MW
939181 AE1-148 C Adder 7.94 MW 6.75 MW
941031 AE2-094 C 80/20 39.92 MW 39.92 MW
946281 AF1-292 C Adder 1.39 MW 1.18 MW
946301 AF1-294 C Adder 3.25 MW 2.76 MW
957481 AF2-042 C 80/20 51.04 MW 51.04 MW
957521 AF2-046 C Adder 12.46 MW 10.59 MW
957861 AF2-080 C Adder 6.58 MW 5.59 MW
958211 AF2-115 C Adder 1.98 MW 1.68 MW
938771 AE1-103 C Adder 2.57 MW 2.18 MW
314507 3THOMPSN Adder 1.76 MW 1.5 MW
315065 1CHESTF6 Adder 15.65 MW 13.3 MW
315073 1STONECA Adder 5.33 MW 4.53 MW
315083 1SPRUNCA Adder 7.63 MW 6.49 MW
315084 1SPRUNCB Adder 7.63 MW 6.49 MW
315092 1YORKTN3 Adder 100.44 MW 85.37 MW
934861 AD1-115 C Adder 2.85 MW 2.42 MW
942341 AE2-247 C Adder 1.3 MW 1.1 MW
943461 AF1-017 C Adder 1.18 MW 1.0 MW
315098 1CHESPKA 80/20 0.38 MW 0.38 MW
315099 1CHESPKB 80/20 0.63 MW 0.63 MW
315102 1BRUNSWICKG1 80/20 8.15 MW 8.15 MW
315103 1BRUNSWICKG2 80/20 8.15 MW 8.15 MW
315104 1BRUNSWICKG3 80/20 8.15 MW 8.15 MW
315105 1BRUNSWICKS1 80/20 16.93 MW 16.93 MW
315108 1ELIZAR1 80/20 2.78 MW 2.78 MW
315109 1ELIZAR2 80/20 2.73 MW 2.73 MW
315110 1ELIZAR3 80/20 2.82 MW 2.82 MW
315172 1LOISA A 80/20 2.69 MW 2.69 MW
315173 1LOISA B 80/20 2.71 MW 2.71 MW
315174 1LOISA C 80/20 2.71 MW 2.71 MW
315175 1LOISA D 80/20 2.71 MW 2.71 MW
315176 1LOISA E 80/20 5.52 MW 5.52 MW
315177 1S ANNAG1 80/20 2.65 MW 2.65 MW
315178 1S ANNAS1 80/20 1.36 MW 1.36 MW
315179 1S ANNAG2 80/20 2.65 MW 2.65 MW
315180 1S ANNAS2 80/20 1.36 MW 1.36 MW
315225 1N ANNA1 80/20 89.05 MW 89.05 MW
315226 1N ANNA2 80/20 89.08 MW 89.08 MW
315241 1Z1-086 GT1 80/20 10.44 MW 10.44 MW
315242 1Z1-086 GT2 80/20 10.44 MW 10.44 MW
315243 1Z1-086 GT3 80/20 10.44 MW 10.44 MW
315244 1Z1-086 ST 80/20 18.18 MW 18.18 MW
315260 1GOSPORTA Adder 1.86 MW 1.58 MW
315261 1GOSPORTB 80/20 2.37 MW 2.37 MW
315262 1GOSPORTC Adder 2.01 MW 1.71 MW
966001 AG1-469 C 80/20 1.96 MW 1.96 MW
942001 AE2-212 C Adder 1.82 MW 1.55 MW
957871 AF2-081 C Adder 8.73 MW 7.42 MW
958161 AF2-110 C Adder 1.2 MW 1.02 MW
926071 AC1-086 C Adder 18.57 MW 15.79 MW
927021 AC1-189 C Adder 7.24 MW 6.15 MW
936261 AD2-033 C Adder 11.47 MW 9.75 MW
933291 AC2-141 C 80/20 26.48 MW 26.48 MW
934621 AD1-088 C 80/20 11.86 MW 11.86 MW
939411 AE1-173 C 80/20 88.01 MW 88.01 MW
916191 Z1-068 C 80/20 0.04 MW 0.04 MW
933981 AD1-022 C Adder 7.65 MW 6.5 MW
961681 AG1-008 C Adder 12.46 MW 10.59 MW
962571 AG1-106 C Adder 2.4 MW 2.04 MW
208900 BRIS G1 80/20 -2.63 MW -2.63 MW
208901 BRIS G2 80/20 -3.11 MW -3.11 MW
316023 AB2-100 C2 80/20 0.86 MW 0.86 MW
316036 AC1-147 C 80/20 0.32 MW 0.32 MW
316164 AC1-076_C 80/20 1.11 MW 1.11 MW
316170 AC1-121 C 80/20 2.73 MW 2.73 MW
316185 AD1-033 C 80/20 1.07 MW 1.07 MW
316192 AB2-158 C 80/20 3.63 MW 3.63 MW
316233 AE1-074 C 80/20 2.42 MW 2.42 MW
316240 AF1-291 C Adder 1.74 MW 1.48 MW
316254 AC1-120 C 80/20 7.93 MW 7.93 MW
316257 AC1-043 C Adder 5.7 MW 4.84 MW
316258 AE1-075 C 80/20 0.35 MW 0.35 MW
316263 AC1-034 C Adder 5.69 MW 4.83 MW
316274 AC1-208 C Adder 7.86 MW 6.68 MW
316294 AC1-161 C 80/20 4.31 MW 4.31 MW
316313 AB2-026 C 80/20 0.38 MW 0.38 MW
316315 AB2-025 C 80/20 0.38 MW 0.38 MW
316316 AC1-027 C 80/20 0.28 MW 0.28 MW
316336 AC2-165 C 80/20 9.63 MW 9.63 MW
316365 AB2-100 C1 80/20 0.86 MW 0.86 MW
316405 AF2-144 C 80/20 0.29 MW 0.29 MW
316044 AC1-158 C1 80/20 19.42 MW 19.42 MW
316045 AC1-158 C2 80/20 19.42 MW 19.42 MW
316375 AC2-012 C 80/20 1.17 MW 1.17 MW
316311 AC2-079 C Adder 5.0 MW 4.25 MW
316349 AD2-085 C Adder 3.0 MW 2.55 MW
316388 AE2-253 GEN 80/20 1.71 MW 1.71 MW
961611 AG1-000B C Adder 12.92 MW 10.98 MW
941591 AE2-156 C 80/20 15.61 MW 15.61 MW
944581 AF1-123 C 80/20 39.93 MW 39.93 MW
944591 AF1-124 C 80/20 40.07 MW 40.07 MW
944601 AF1-125 C 80/20 39.32 MW 39.32 MW
962491 AG1-098 C 80/20 10.62 MW 10.62 MW
962561 AG1-105 C Adder 7.71 MW 6.55 MW
964241 AG1-285 C Adder 11.04 MW 9.39 MW
965281 AG1-393 C Adder 1.77 MW 1.5 MW
313764 3SOCKMAN Adder 0.63 MW 0.54 MW
934321 AD1-056 C Adder 5.44 MW 4.62 MW
934331 AD1-057 C Adder 3.03 MW 2.58 MW
934501 AD1-074 C Adder 29.42 MW 25.01 MW
934511 AD1-075 C Adder 7.36 MW 6.25 MW
934611 AD1-087 C 80/20 1.16 MW 1.16 MW
935161 AD1-151 C Adder 12.77 MW 10.86 MW
937481 AD2-202 C 80/20 0.34 MW 0.34 MW
938531 AE1-072 C Adder 15.36 MW 13.05 MW
939191 AE1-149 C Adder 9.27 MW 7.88 MW
940431 AE2-027 C Adder 10.48 MW 8.9 MW
940481 AE2-033 C 80/20 14.9 MW 14.9 MW
940541 AE2-040 C 80/20 2.65 MW 2.65 MW
940641 AE2-051 C 80/20 17.3 MW 17.3 MW
941101 AE2-104 C Adder 2.93 MW 2.49 MW
942461 AE2-259 C Adder 8.75 MW 7.44 MW
944641 AF1-129 C Adder 81.61 MW 69.36 MW
316303 AF2-085 80/20 4.19 MW 4.19 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 21.91 MW 21.91 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 18.48 MW 18.48 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 83.41 MW 83.41 MW
NY PJM->LTFIMP_NY CLTF 2.53 MW 2.53 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.97 MW 0.97 MW
WEC LTFEXP_WEC->PJM CLTF 0.47 MW 0.47 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.95 MW 9.95 MW
TVA LTFEXP_TVA->PJM CLTF 5.19 MW 5.19 MW
MEC LTFEXP_MEC->PJM CLTF 3.06 MW 3.06 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.53 MW 6.53 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.19 MW 0.19 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.74 MW 4.74 MW

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
Contingency Name:
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 122.77 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3953.87 MVA
MW Contribution: 49.47 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.93 MW 0.79 MW
961791 AG1-021 C Adder 1.7 MW 1.45 MW
961941 AG1-037 C Adder 0.53 MW 0.45 MW
962331 AG1-082 C Adder 2.11 MW 1.79 MW
963041 AG1-153 C Adder 5.77 MW 4.9 MW
963171 AG1-166 C Adder 0.95 MW 0.8 MW
963181 AG1-167 C Adder 0.71 MW 0.6 MW
963191 AG1-168 C Adder 0.71 MW 0.6 MW
964791 AG1-342 C Adder 3.32 MW 2.83 MW
966801 AG1-551 C Adder 2.15 MW 1.82 MW
966811 AG1-552 C Adder 2.1 MW 1.78 MW
965291 AG1-394 C Adder 0.9 MW 0.76 MW
966621 AG1-532 C Adder 1.44 MW 1.22 MW
313853 3PONTONDP Adder 0.63 MW 0.54 MW
934521 AD1-076 C Adder 12.97 MW 11.02 MW
944011 AF1-069 C 80/20 13.52 MW 13.52 MW
959311 AF2-222 C Adder 15.87 MW 13.49 MW
960081 AF2-299 C Adder 1.92 MW 1.63 MW
938371 AE1-056 C Adder 6.1 MW 5.18 MW
939181 AE1-148 C Adder 8.68 MW 7.38 MW
941031 AE2-094 C 80/20 41.39 MW 41.39 MW
946281 AF1-292 C Adder 1.58 MW 1.35 MW
946301 AF1-294 C Adder 3.5 MW 2.98 MW
957481 AF2-042 C Adder 53.68 MW 45.62 MW
957521 AF2-046 C Adder 14.87 MW 12.64 MW
957861 AF2-080 C Adder 7.65 MW 6.5 MW
958211 AF2-115 C Adder 2.13 MW 1.81 MW
938771 AE1-103 C Adder 3.16 MW 2.69 MW
314236 6NRTHEST 80/20 0.2 MW 0.2 MW
314309 6IRON208 80/20 0.48 MW 0.48 MW
314507 3THOMPSN Adder 2.23 MW 1.9 MW
315060 1CHESTF5 Adder 69.01 MW 58.66 MW
315065 1CHESTF6 80/20 21.77 MW 21.77 MW
315073 1STONECA 80/20 7.61 MW 7.61 MW
315076 1HOPPOLC 80/20 1.69 MW 1.69 MW
315077 1HOPHCF1 80/20 2.68 MW 2.68 MW
315078 1HOPHCF2 80/20 2.68 MW 2.68 MW
315079 1HOPHCF3 80/20 2.68 MW 2.68 MW
315080 1HOPHCF4 80/20 4.07 MW 4.07 MW
315083 1SPRUNCA 80/20 10.22 MW 10.22 MW
315084 1SPRUNCB 80/20 10.22 MW 10.22 MW
315092 1YORKTN3 Adder 144.43 MW 122.76 MW
936591 AD2-074 C Adder 5.73 MW 4.87 MW
942341 AE2-247 C Adder 1.64 MW 1.4 MW
943461 AF1-017 C Adder 1.49 MW 1.26 MW
943741 AF1-042 C Adder 3.0 MW 2.55 MW
961951 AG1-038 C Adder 3.31 MW 2.82 MW
966661 AG1-536 C Adder 5.51 MW 4.68 MW
966871 AG1-558 C Adder 2.51 MW 2.13 MW
966881 AG1-559 C Adder 2.4 MW 2.04 MW
315099 1CHESPKB 80/20 0.8 MW 0.8 MW
315108 1ELIZAR1 80/20 3.53 MW 3.53 MW
315109 1ELIZAR2 80/20 3.47 MW 3.47 MW
315110 1ELIZAR3 80/20 3.57 MW 3.57 MW
315225 1N ANNA1 80/20 55.33 MW 55.33 MW
315226 1N ANNA2 80/20 55.35 MW 55.35 MW
315233 1SURRY 2 80/20 27.3 MW 27.3 MW
315260 1GOSPORTA Adder 2.36 MW 2.0 MW
315261 1GOSPORTB Adder 3.01 MW 2.56 MW
315262 1GOSPORTC Adder 2.55 MW 2.17 MW
957411 AF2-035 C Adder 8.65 MW 7.35 MW
957601 AF2-054 C Adder 2.21 MW 1.88 MW
962861 AG1-135 C Adder 6.23 MW 5.29 MW
962971 AG1-146 C Adder 3.19 MW 2.71 MW
962981 AG1-147 C Adder 7.44 MW 6.32 MW
963051 AG1-154 C Adder 3.44 MW 2.92 MW
963611 AG1-210 C Adder 0.67 MW 0.57 MW
964211 AG1-282 C Adder 2.03 MW 1.73 MW
942001 AE2-212 C 80/20 2.4 MW 2.4 MW
957871 AF2-081 C Adder 10.98 MW 9.34 MW
958161 AF2-110 C Adder 1.5 MW 1.28 MW
926071 AC1-086 C Adder 21.52 MW 18.29 MW
927021 AC1-189 C Adder 8.42 MW 7.16 MW
936261 AD2-033 C Adder 12.42 MW 10.55 MW
933291 AC2-141 C 80/20 33.68 MW 33.68 MW
934621 AD1-088 C Adder 12.5 MW 10.63 MW
939411 AE1-173 C 80/20 97.69 MW 97.69 MW
927041 AC1-191 C Adder 10.08 MW 8.57 MW
933981 AD1-022 C Adder 9.25 MW 7.87 MW
961681 AG1-008 C Adder 14.87 MW 12.64 MW
962571 AG1-106 C Adder 2.78 MW 2.37 MW
316164 AC1-076_C 80/20 0.99 MW 0.99 MW
316169 AC1-164 GEN Adder 42.79 MW 36.37 MW
316192 AB2-158 C 80/20 2.12 MW 2.12 MW
316233 AE1-074 C 80/20 2.82 MW 2.82 MW
316240 AF1-291 C 80/20 2.4 MW 2.4 MW
316274 AC1-208 C Adder 9.1 MW 7.73 MW
316294 AC1-161 C 80/20 5.48 MW 5.48 MW
316336 AC2-165 C Adder 10.13 MW 8.61 MW
316044 AC1-158 C1 80/20 14.96 MW 14.96 MW
316045 AC1-158 C2 80/20 14.96 MW 14.96 MW
316375 AC2-012 C 80/20 1.49 MW 1.49 MW
316311 AC2-079 C Adder 6.32 MW 5.37 MW
316349 AD2-085 C Adder 3.79 MW 3.22 MW
961611 AG1-000B C Adder 17.56 MW 14.93 MW
941591 AE2-156 C 80/20 19.8 MW 19.8 MW
944581 AF1-123 C 80/20 50.24 MW 50.24 MW
944591 AF1-124 C 80/20 50.42 MW 50.42 MW
944601 AF1-125 C 80/20 49.47 MW 49.47 MW
944631 AF1-128 C Adder 43.18 MW 36.7 MW
958261 AF2-120 C Adder 6.41 MW 5.45 MW
962491 AG1-098 C Adder 11.2 MW 9.52 MW
962561 AG1-105 C Adder 8.36 MW 7.11 MW
964241 AG1-285 C Adder 11.99 MW 10.19 MW
965281 AG1-393 C 80/20 2.39 MW 2.39 MW
313764 3SOCKMAN Adder 0.73 MW 0.62 MW
934321 AD1-056 C Adder 6.26 MW 5.32 MW
934331 AD1-057 C Adder 3.49 MW 2.97 MW
934501 AD1-074 C Adder 35.71 MW 30.35 MW
934511 AD1-075 C Adder 8.93 MW 7.59 MW
935161 AD1-151 C Adder 17.8 MW 15.13 MW
938531 AE1-072 C Adder 19.3 MW 16.41 MW
939191 AE1-149 C 80/20 11.91 MW 11.91 MW
939261 AE1-157 C Adder 13.78 MW 11.71 MW
940431 AE2-027 C 80/20 14.32 MW 14.32 MW
940481 AE2-033 C Adder 17.09 MW 14.53 MW
940541 AE2-040 C Adder 3.04 MW 2.58 MW
940551 AE2-041 C Adder 7.46 MW 6.34 MW
940641 AE2-051 C 80/20 18.5 MW 18.5 MW
941101 AE2-104 C Adder 3.68 MW 3.13 MW
942461 AE2-259 C Adder 9.36 MW 7.96 MW
943471 AF1-018 C Adder 7.46 MW 6.34 MW
944641 AF1-129 C 80/20 113.54 MW 113.54 MW
315085 1SPRUNCC 80/20 0.18 MW 0.18 MW
315086 1SPRUNCD 80/20 0.18 MW 0.18 MW
316303 AF2-085 80/20 4.37 MW 4.37 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 27.62 MW 27.62 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 22.07 MW 22.07 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 94.18 MW 94.18 MW
NY PJM->LTFIMP_NY CLTF 2.81 MW 2.81 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.22 MW 1.22 MW
WEC LTFEXP_WEC->PJM CLTF 0.59 MW 0.59 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.09 MW 11.09 MW
TVA LTFEXP_TVA->PJM CLTF 6.14 MW 6.14 MW
MEC LTFEXP_MEC->PJM CLTF 3.74 MW 3.74 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.67 MW 7.67 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.24 MW 0.24 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.29 MW 5.29 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Contingency Name:
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 120.01 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3864.83 MVA
MW Contribution: 67.94 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.35 MW 1.15 MW
961791 AG1-021 C Adder 2.41 MW 2.05 MW
961941 AG1-037 C Adder 0.74 MW 0.63 MW
962331 AG1-082 C Adder 2.98 MW 2.53 MW
963041 AG1-153 C 80/20 8.78 MW 8.78 MW
963171 AG1-166 C Adder 1.34 MW 1.14 MW
963181 AG1-167 C Adder 1.0 MW 0.85 MW
963191 AG1-168 C Adder 1.0 MW 0.85 MW
964791 AG1-342 C Adder 4.88 MW 4.15 MW
966801 AG1-551 C Adder 3.07 MW 2.61 MW
966811 AG1-552 C Adder 3.01 MW 2.56 MW
965291 AG1-394 C Adder 1.27 MW 1.08 MW
966621 AG1-532 C Adder 2.06 MW 1.75 MW
313853 3PONTONDP Adder 0.89 MW 0.76 MW
315131 1EDGECMA Adder 22.17 MW 18.85 MW
934521 AD1-076 C Adder 18.18 MW 15.45 MW
944011 AF1-069 C 80/20 20.64 MW 20.64 MW
959311 AF2-222 C Adder 22.69 MW 19.29 MW
960061 AF2-297 C Adder 10.62 MW 9.03 MW
960081 AF2-299 C Adder 2.75 MW 2.34 MW
938371 AE1-056 C Adder 8.59 MW 7.3 MW
939181 AE1-148 C Adder 12.7 MW 10.79 MW
941031 AE2-094 C 80/20 63.18 MW 63.18 MW
946281 AF1-292 C Adder 2.28 MW 1.94 MW
946301 AF1-294 C Adder 4.95 MW 4.21 MW
957481 AF2-042 C 80/20 80.42 MW 80.42 MW
957521 AF2-046 C Adder 20.99 MW 17.84 MW
957861 AF2-080 C Adder 11.03 MW 9.38 MW
958211 AF2-115 C Adder 3.01 MW 2.56 MW
938771 AE1-103 C 80/20 4.38 MW 4.38 MW
313526 AB2-022 C 80/20 0.56 MW 0.56 MW
314507 3THOMPSN 80/20 3.05 MW 3.05 MW
315060 1CHESTF5 Adder 83.1 MW 70.64 MW
315065 1CHESTF6 Adder 27.68 MW 23.53 MW
315073 1STONECA Adder 9.58 MW 8.15 MW
315083 1SPRUNCA 80/20 13.16 MW 13.16 MW
315084 1SPRUNCB 80/20 13.16 MW 13.16 MW
315092 1YORKTN3 Adder 183.57 MW 156.03 MW
942341 AE2-247 C 80/20 2.24 MW 2.24 MW
943461 AF1-017 C 80/20 2.02 MW 2.02 MW
315098 1CHESPKA 80/20 0.66 MW 0.66 MW
315099 1CHESPKB 80/20 1.09 MW 1.09 MW
315102 1BRUNSWICKG1 80/20 12.92 MW 12.92 MW
315103 1BRUNSWICKG2 80/20 12.92 MW 12.92 MW
315104 1BRUNSWICKG3 80/20 12.92 MW 12.92 MW
315105 1BRUNSWICKS1 80/20 26.84 MW 26.84 MW
315108 1ELIZAR1 80/20 4.82 MW 4.82 MW
315109 1ELIZAR2 80/20 4.74 MW 4.74 MW
315110 1ELIZAR3 80/20 4.88 MW 4.88 MW
315233 1SURRY 2 80/20 35.97 MW 35.97 MW
315241 1Z1-086 GT1 80/20 16.55 MW 16.55 MW
315242 1Z1-086 GT2 80/20 16.54 MW 16.54 MW
315243 1Z1-086 GT3 80/20 16.54 MW 16.54 MW
315244 1Z1-086 ST 80/20 28.8 MW 28.8 MW
315260 1GOSPORTA 80/20 3.22 MW 3.22 MW
315261 1GOSPORTB 80/20 4.11 MW 4.11 MW
315262 1GOSPORTC 80/20 3.49 MW 3.49 MW
315605 6W1-029WIND 80/20 1.16 MW 1.16 MW
315611 6Z1-036WIND 80/20 0.98 MW 0.98 MW
957601 AF2-054 C Adder 2.53 MW 2.15 MW
942001 AE2-212 C 80/20 3.15 MW 3.15 MW
957871 AF2-081 C 80/20 15.08 MW 15.08 MW
958161 AF2-110 C 80/20 2.06 MW 2.06 MW
926071 AC1-086 C Adder 30.85 MW 26.22 MW
927021 AC1-189 C Adder 12.14 MW 10.32 MW
936261 AD2-033 C Adder 17.83 MW 15.16 MW
933291 AC2-141 C 80/20 46.1 MW 46.1 MW
934621 AD1-088 C 80/20 18.55 MW 18.55 MW
939411 AE1-173 C 80/20 143.54 MW 143.54 MW
916191 Z1-068 C 80/20 0.07 MW 0.07 MW
933981 AD1-022 C Adder 12.99 MW 11.04 MW
961681 AG1-008 C Adder 20.99 MW 17.84 MW
962571 AG1-106 C Adder 3.99 MW 3.39 MW
316023 AB2-100 C2 80/20 1.42 MW 1.42 MW
316036 AC1-147 C 80/20 0.56 MW 0.56 MW
316072 AD1-144 C 80/20 0.42 MW 0.42 MW
316169 AC1-164 GEN Adder 49.05 MW 41.69 MW
316185 AD1-033 C 80/20 1.85 MW 1.85 MW
316233 AE1-074 C 80/20 3.92 MW 3.92 MW
316236 AE1-162 C 80/20 0.51 MW 0.51 MW
316240 AF1-291 C Adder 3.07 MW 2.61 MW
316246 AF1-032 C 80/20 0.43 MW 0.43 MW
316258 AE1-075 C 80/20 0.51 MW 0.51 MW
316263 AC1-034 C Adder 9.48 MW 8.06 MW
316274 AC1-208 C Adder 13.09 MW 11.13 MW
316294 AC1-161 C 80/20 7.51 MW 7.51 MW
316305 AF2-043 C 80/20 0.52 MW 0.52 MW
316313 AB2-026 C 80/20 0.56 MW 0.56 MW
316315 AB2-025 C 80/20 0.62 MW 0.62 MW
316316 AC1-027 C 80/20 0.48 MW 0.48 MW
316320 Y1-086 C 80/20 0.33 MW 0.33 MW
316321 Z2-027 C 80/20 0.55 MW 0.55 MW
316336 AC2-165 C Adder 14.08 MW 11.97 MW
316365 AB2-100 C1 80/20 1.42 MW 1.42 MW
316405 AF2-144 C 80/20 0.44 MW 0.44 MW
316017 AA1-139 ULT1 80/20 1.63 MW 1.63 MW
316018 AA1-139 ULT2 80/20 1.63 MW 1.63 MW
316083 AB2-161 C 80/20 0.82 MW 0.82 MW
316375 AC2-012 C 80/20 2.03 MW 2.03 MW
316311 AC2-079 C 80/20 8.61 MW 8.61 MW
316381 AD1-082 C 80/20 1.88 MW 1.88 MW
316349 AD2-085 C 80/20 5.17 MW 5.17 MW
316388 AE2-253 GEN 80/20 2.96 MW 2.96 MW
961611 AG1-000B C Adder 22.92 MW 19.48 MW
941591 AE2-156 C 80/20 27.04 MW 27.04 MW
944581 AF1-123 C 80/20 69.0 MW 69.0 MW
944591 AF1-124 C 80/20 69.25 MW 69.25 MW
944601 AF1-125 C 80/20 67.94 MW 67.94 MW
944631 AF1-128 C Adder 52.0 MW 44.2 MW
962491 AG1-098 C Adder 16.59 MW 14.1 MW
962561 AG1-105 C Adder 12.27 MW 10.43 MW
964241 AG1-285 C Adder 17.33 MW 14.73 MW
965281 AG1-393 C Adder 3.09 MW 2.63 MW
313764 3SOCKMAN Adder 1.04 MW 0.89 MW
934321 AD1-056 C Adder 9.05 MW 7.69 MW
934331 AD1-057 C Adder 5.05 MW 4.29 MW
934501 AD1-074 C Adder 50.05 MW 42.54 MW
934511 AD1-075 C Adder 12.51 MW 10.64 MW
935161 AD1-151 C Adder 22.81 MW 19.39 MW
938531 AE1-072 C 80/20 26.51 MW 26.51 MW
939191 AE1-149 C 80/20 15.95 MW 15.95 MW
940431 AE2-027 C Adder 18.41 MW 15.64 MW
940481 AE2-033 C 80/20 24.51 MW 24.51 MW
940541 AE2-040 C 80/20 4.36 MW 4.36 MW
940551 AE2-041 C Adder 8.5 MW 7.22 MW
940641 AE2-051 C 80/20 27.76 MW 27.76 MW
941101 AE2-104 C 80/20 5.05 MW 5.05 MW
942461 AE2-259 C Adder 13.02 MW 11.06 MW
943471 AF1-018 C Adder 8.5 MW 7.22 MW
944641 AF1-129 C Adder 144.36 MW 122.71 MW
315085 1SPRUNCC 80/20 0.24 MW 0.24 MW
315086 1SPRUNCD 80/20 0.24 MW 0.24 MW
316303 AF2-085 80/20 6.48 MW 6.48 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 65.07 MW 65.07 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 40.2 MW 40.2 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 144.5 MW 144.5 MW
NY PJM->LTFIMP_NY CLTF 3.19 MW 3.19 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.59 MW 2.59 MW
WEC LTFEXP_WEC->PJM CLTF 1.34 MW 1.34 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.72 MW 16.72 MW
TVA LTFEXP_TVA->PJM CLTF 10.46 MW 10.46 MW
MEC LTFEXP_MEC->PJM CLTF 7.62 MW 7.62 MW
LAGN LTFEXP_LAGN->PJM CLTF 13.13 MW 13.13 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.49 MW 0.49 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.98 MW 7.98 MW

Details for 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 575_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
Contingency Name:
DVP_P1-2: LN 575_SRT-S
CONTINGENCY 'DVP_P1-2: LN 575_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1                /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 118.84 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3827.26 MVA
MW Contribution: 40.3 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.83 MW 0.7 MW
961791 AG1-021 C Adder 1.62 MW 1.37 MW
961941 AG1-037 C Adder 0.45 MW 0.39 MW
962331 AG1-082 C Adder 1.82 MW 1.54 MW
963041 AG1-153 C 80/20 5.71 MW 5.71 MW
963171 AG1-166 C Adder 0.9 MW 0.76 MW
963181 AG1-167 C Adder 0.67 MW 0.57 MW
963191 AG1-168 C Adder 0.67 MW 0.57 MW
964791 AG1-342 C Adder 3.15 MW 2.68 MW
966801 AG1-551 C Adder 1.87 MW 1.59 MW
966811 AG1-552 C Adder 1.87 MW 1.59 MW
965291 AG1-394 C Adder 0.77 MW 0.66 MW
966621 AG1-532 C Adder 1.29 MW 1.1 MW
313853 3PONTONDP Adder 0.6 MW 0.51 MW
315131 1EDGECMA Adder 13.68 MW 11.63 MW
315153 1CLOVER1 80/20 12.11 MW 12.11 MW
315154 1CLOVER2 80/20 11.99 MW 11.99 MW
934521 AD1-076 C Adder 10.97 MW 9.32 MW
944011 AF1-069 C 80/20 13.44 MW 13.44 MW
959311 AF2-222 C Adder 15.02 MW 12.77 MW
960061 AF2-297 C Adder 6.81 MW 5.79 MW
960081 AF2-299 C Adder 1.72 MW 1.46 MW
938371 AE1-056 C Adder 5.79 MW 4.92 MW
939181 AE1-148 C Adder 8.16 MW 6.93 MW
941031 AE2-094 C 80/20 41.13 MW 41.13 MW
946281 AF1-292 C Adder 1.42 MW 1.21 MW
946301 AF1-294 C Adder 3.32 MW 2.82 MW
957481 AF2-042 C 80/20 52.49 MW 52.49 MW
957521 AF2-046 C Adder 12.79 MW 10.88 MW
957861 AF2-080 C Adder 6.76 MW 5.75 MW
958211 AF2-115 C Adder 2.02 MW 1.72 MW
938771 AE1-103 C Adder 2.63 MW 2.24 MW
314507 3THOMPSN Adder 1.8 MW 1.53 MW
315060 1CHESTF5 Adder 45.32 MW 38.52 MW
315065 1CHESTF6 Adder 15.98 MW 13.58 MW
315073 1STONECA Adder 5.44 MW 4.62 MW
315083 1SPRUNCA Adder 7.8 MW 6.63 MW
315084 1SPRUNCB Adder 7.8 MW 6.63 MW
315092 1YORKTN3 Adder 102.5 MW 87.13 MW
942341 AE2-247 C Adder 1.33 MW 1.13 MW
943461 AF1-017 C Adder 1.2 MW 1.02 MW
315098 1CHESPKA 80/20 0.39 MW 0.39 MW
315099 1CHESPKB 80/20 0.64 MW 0.64 MW
315102 1BRUNSWICKG1 80/20 8.39 MW 8.39 MW
315103 1BRUNSWICKG2 80/20 8.39 MW 8.39 MW
315104 1BRUNSWICKG3 80/20 8.39 MW 8.39 MW
315105 1BRUNSWICKS1 80/20 17.44 MW 17.44 MW
315108 1ELIZAR1 80/20 2.85 MW 2.85 MW
315109 1ELIZAR2 80/20 2.8 MW 2.8 MW
315110 1ELIZAR3 80/20 2.89 MW 2.89 MW
315172 1LOISA A 80/20 2.38 MW 2.38 MW
315173 1LOISA B 80/20 2.39 MW 2.39 MW
315174 1LOISA C 80/20 2.39 MW 2.39 MW
315175 1LOISA D 80/20 2.39 MW 2.39 MW
315176 1LOISA E 80/20 4.87 MW 4.87 MW
315177 1S ANNAG1 80/20 2.37 MW 2.37 MW
315178 1S ANNAS1 80/20 1.22 MW 1.22 MW
315179 1S ANNAG2 80/20 2.37 MW 2.37 MW
315180 1S ANNAS2 80/20 1.22 MW 1.22 MW
315225 1N ANNA1 80/20 92.73 MW 92.73 MW
315226 1N ANNA2 80/20 92.77 MW 92.77 MW
315241 1Z1-086 GT1 80/20 10.76 MW 10.76 MW
315242 1Z1-086 GT2 80/20 10.76 MW 10.76 MW
315243 1Z1-086 GT3 80/20 10.76 MW 10.76 MW
315244 1Z1-086 ST 80/20 18.73 MW 18.73 MW
315260 1GOSPORTA Adder 1.9 MW 1.62 MW
315261 1GOSPORTB 80/20 2.43 MW 2.43 MW
315262 1GOSPORTC Adder 2.06 MW 1.75 MW
966001 AG1-469 C Adder 1.44 MW 1.22 MW
942001 AE2-212 C Adder 1.86 MW 1.58 MW
957871 AF2-081 C 80/20 8.95 MW 8.95 MW
958161 AF2-110 C Adder 1.23 MW 1.04 MW
926071 AC1-086 C Adder 19.09 MW 16.22 MW
927021 AC1-189 C Adder 7.45 MW 6.33 MW
936261 AD2-033 C Adder 11.74 MW 9.98 MW
933291 AC2-141 C 80/20 27.13 MW 27.13 MW
934621 AD1-088 C 80/20 12.18 MW 12.18 MW
939411 AE1-173 C 80/20 90.52 MW 90.52 MW
916191 Z1-068 C 80/20 0.04 MW 0.04 MW
933981 AD1-022 C Adder 7.85 MW 6.67 MW
961681 AG1-008 C Adder 12.79 MW 10.88 MW
962571 AG1-106 C Adder 2.47 MW 2.1 MW
208900 BRIS G1 80/20 -2.56 MW -2.56 MW
208901 BRIS G2 80/20 -3.03 MW -3.03 MW
316023 AB2-100 C2 80/20 0.89 MW 0.89 MW
316036 AC1-147 C 80/20 0.33 MW 0.33 MW
316185 AD1-033 C 80/20 1.1 MW 1.1 MW
316192 AB2-158 C 80/20 3.56 MW 3.56 MW
316233 AE1-074 C 80/20 2.48 MW 2.48 MW
316240 AF1-291 C Adder 1.78 MW 1.51 MW
316258 AE1-075 C 80/20 0.35 MW 0.35 MW
316263 AC1-034 C Adder 5.85 MW 4.98 MW
316274 AC1-208 C Adder 8.08 MW 6.87 MW
316294 AC1-161 C 80/20 4.42 MW 4.42 MW
316313 AB2-026 C 80/20 0.39 MW 0.39 MW
316315 AB2-025 C 80/20 0.39 MW 0.39 MW
316316 AC1-027 C 80/20 0.28 MW 0.28 MW
316336 AC2-165 C 80/20 9.81 MW 9.81 MW
316365 AB2-100 C1 80/20 0.89 MW 0.89 MW
316405 AF2-144 C 80/20 0.3 MW 0.3 MW
316017 AA1-139 ULT1 80/20 0.97 MW 0.97 MW
316018 AA1-139 ULT2 80/20 0.97 MW 0.97 MW
316375 AC2-012 C 80/20 1.2 MW 1.2 MW
316311 AC2-079 C Adder 5.12 MW 4.35 MW
316349 AD2-085 C Adder 3.07 MW 2.61 MW
316388 AE2-253 GEN 80/20 1.75 MW 1.75 MW
961611 AG1-000B C Adder 13.21 MW 11.23 MW
941591 AE2-156 C 80/20 15.99 MW 15.99 MW
944581 AF1-123 C 80/20 40.92 MW 40.92 MW
944591 AF1-124 C 80/20 41.07 MW 41.07 MW
944601 AF1-125 C 80/20 40.3 MW 40.3 MW
944631 AF1-128 C Adder 28.36 MW 24.11 MW
962491 AG1-098 C 80/20 10.9 MW 10.9 MW
962561 AG1-105 C Adder 7.92 MW 6.73 MW
964241 AG1-285 C Adder 11.32 MW 9.62 MW
965281 AG1-393 C Adder 1.81 MW 1.54 MW
313764 3SOCKMAN Adder 0.65 MW 0.55 MW
934321 AD1-056 C Adder 5.59 MW 4.75 MW
934331 AD1-057 C Adder 3.12 MW 2.65 MW
934501 AD1-074 C Adder 30.2 MW 25.67 MW
934511 AD1-075 C Adder 7.55 MW 6.42 MW
934611 AD1-087 C 80/20 1.19 MW 1.19 MW
935161 AD1-151 C Adder 13.05 MW 11.09 MW
937481 AD2-202 C 80/20 0.35 MW 0.35 MW
938531 AE1-072 C Adder 15.74 MW 13.38 MW
939191 AE1-149 C Adder 9.49 MW 8.07 MW
940431 AE2-027 C Adder 10.7 MW 9.1 MW
940481 AE2-033 C 80/20 15.31 MW 15.31 MW
940541 AE2-040 C 80/20 2.72 MW 2.72 MW
940641 AE2-051 C 80/20 17.81 MW 17.81 MW
941101 AE2-104 C Adder 3.0 MW 2.55 MW
942461 AE2-259 C Adder 8.91 MW 7.58 MW
944641 AF1-129 C Adder 83.34 MW 70.84 MW
316303 AF2-085 80/20 4.31 MW 4.31 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 25.14 MW 25.14 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 19.84 MW 19.84 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 86.43 MW 86.43 MW
NY PJM->LTFIMP_NY CLTF 2.45 MW 2.45 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.08 MW 1.08 MW
WEC LTFEXP_WEC->PJM CLTF 0.54 MW 0.54 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.27 MW 10.27 MW
TVA LTFEXP_TVA->PJM CLTF 5.5 MW 5.5 MW
MEC LTFEXP_MEC->PJM CLTF 3.37 MW 3.37 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.91 MW 6.91 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.21 MW 0.21 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.9 MW 4.9 MW

Details for 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
Contingency Name:
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 117.57 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3786.34 MVA
MW Contribution: 50.51 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.95 MW 0.81 MW
961791 AG1-021 C Adder 1.72 MW 1.46 MW
961941 AG1-037 C Adder 0.54 MW 0.46 MW
962331 AG1-082 C Adder 2.15 MW 1.83 MW
963041 AG1-153 C Adder 5.89 MW 5.0 MW
963171 AG1-166 C Adder 0.96 MW 0.81 MW
963181 AG1-167 C Adder 0.72 MW 0.61 MW
963191 AG1-168 C Adder 0.72 MW 0.61 MW
964791 AG1-342 C Adder 3.38 MW 2.88 MW
966801 AG1-551 C Adder 2.19 MW 1.86 MW
966811 AG1-552 C Adder 2.14 MW 1.82 MW
965291 AG1-394 C Adder 0.92 MW 0.78 MW
966621 AG1-532 C Adder 1.46 MW 1.25 MW
313853 3PONTONDP Adder 0.64 MW 0.54 MW
315131 1EDGECMA Adder 15.56 MW 13.23 MW
934521 AD1-076 C Adder 13.24 MW 11.26 MW
944011 AF1-069 C 80/20 13.81 MW 13.81 MW
959311 AF2-222 C Adder 16.08 MW 13.66 MW
960081 AF2-299 C Adder 1.95 MW 1.66 MW
938371 AE1-056 C Adder 6.16 MW 5.23 MW
939181 AE1-148 C Adder 8.84 MW 7.51 MW
941031 AE2-094 C 80/20 42.26 MW 42.26 MW
946281 AF1-292 C Adder 1.62 MW 1.38 MW
946301 AF1-294 C Adder 3.54 MW 3.01 MW
957481 AF2-042 C Adder 54.68 MW 46.48 MW
957521 AF2-046 C Adder 15.19 MW 12.91 MW
957861 AF2-080 C Adder 7.82 MW 6.64 MW
958211 AF2-115 C Adder 2.15 MW 1.83 MW
938771 AE1-103 C Adder 3.23 MW 2.74 MW
314236 6NRTHEST 80/20 0.2 MW 0.2 MW
314309 6IRON208 80/20 0.49 MW 0.49 MW
314507 3THOMPSN Adder 2.28 MW 1.94 MW
315060 1CHESTF5 Adder 70.44 MW 59.87 MW
315065 1CHESTF6 80/20 22.22 MW 22.22 MW
315073 1STONECA 80/20 7.77 MW 7.77 MW
315076 1HOPPOLC 80/20 1.72 MW 1.72 MW
315077 1HOPHCF1 80/20 2.73 MW 2.73 MW
315078 1HOPHCF2 80/20 2.73 MW 2.73 MW
315079 1HOPHCF3 80/20 2.73 MW 2.73 MW
315080 1HOPHCF4 80/20 4.15 MW 4.15 MW
315083 1SPRUNCA 80/20 10.43 MW 10.43 MW
315084 1SPRUNCB 80/20 10.43 MW 10.43 MW
315092 1YORKTN3 Adder 147.47 MW 125.35 MW
934861 AD1-115 C Adder -3.06 MW -2.6 MW
936591 AD2-074 C Adder 5.86 MW 4.98 MW
942341 AE2-247 C Adder 1.68 MW 1.43 MW
943461 AF1-017 C Adder 1.52 MW 1.29 MW
943741 AF1-042 C Adder 3.06 MW 2.6 MW
961951 AG1-038 C Adder 3.39 MW 2.88 MW
966661 AG1-536 C Adder 5.64 MW 4.79 MW
966871 AG1-558 C Adder 2.56 MW 2.18 MW
966881 AG1-559 C Adder 2.45 MW 2.08 MW
315099 1CHESPKB 80/20 0.81 MW 0.81 MW
315108 1ELIZAR1 80/20 3.6 MW 3.6 MW
315109 1ELIZAR2 80/20 3.54 MW 3.54 MW
315110 1ELIZAR3 80/20 3.65 MW 3.65 MW
315225 1N ANNA1 80/20 56.71 MW 56.71 MW
315226 1N ANNA2 80/20 56.73 MW 56.73 MW
315233 1SURRY 2 80/20 27.88 MW 27.88 MW
315260 1GOSPORTA Adder 2.4 MW 2.04 MW
315261 1GOSPORTB Adder 3.07 MW 2.61 MW
315262 1GOSPORTC Adder 2.61 MW 2.22 MW
957411 AF2-035 C Adder 8.85 MW 7.52 MW
957601 AF2-054 C Adder 2.26 MW 1.92 MW
962861 AG1-135 C Adder 6.37 MW 5.41 MW
962971 AG1-146 C Adder 3.26 MW 2.77 MW
962981 AG1-147 C Adder 7.6 MW 6.46 MW
963051 AG1-154 C Adder 3.52 MW 2.99 MW
963611 AG1-210 C Adder 0.68 MW 0.58 MW
964211 AG1-282 C Adder 2.08 MW 1.77 MW
942001 AE2-212 C 80/20 2.45 MW 2.45 MW
957871 AF2-081 C Adder 11.22 MW 9.53 MW
958161 AF2-110 C Adder 1.53 MW 1.3 MW
926071 AC1-086 C Adder 21.97 MW 18.68 MW
927021 AC1-189 C Adder 8.6 MW 7.31 MW
936261 AD2-033 C Adder 12.59 MW 10.7 MW
933291 AC2-141 C 80/20 34.38 MW 34.38 MW
934621 AD1-088 C Adder 12.72 MW 10.81 MW
939411 AE1-173 C 80/20 99.75 MW 99.75 MW
927041 AC1-191 C Adder 10.29 MW 8.75 MW
933981 AD1-022 C Adder 9.45 MW 8.03 MW
961681 AG1-008 C Adder 15.19 MW 12.91 MW
962571 AG1-106 C Adder 2.84 MW 2.42 MW
316169 AC1-164 GEN Adder 43.68 MW 37.13 MW
316233 AE1-074 C 80/20 2.88 MW 2.88 MW
316240 AF1-291 C 80/20 2.44 MW 2.44 MW
316254 AC1-120 C Adder -6.38 MW -5.42 MW
316257 AC1-043 C Adder -6.12 MW -5.2 MW
316263 AC1-034 C Adder 6.66 MW 5.66 MW
316274 AC1-208 C Adder 9.29 MW 7.89 MW
316294 AC1-161 C 80/20 5.6 MW 5.6 MW
316336 AC2-165 C Adder 10.2 MW 8.67 MW
316375 AC2-012 C 80/20 1.52 MW 1.52 MW
316311 AC2-079 C Adder 6.45 MW 5.48 MW
316349 AD2-085 C Adder 3.87 MW 3.29 MW
961611 AG1-000B C Adder 17.93 MW 15.24 MW
941591 AE2-156 C 80/20 20.22 MW 20.22 MW
944581 AF1-123 C 80/20 51.3 MW 51.3 MW
944591 AF1-124 C 80/20 51.48 MW 51.48 MW
944601 AF1-125 C 80/20 50.51 MW 50.51 MW
944631 AF1-128 C Adder 44.08 MW 37.46 MW
958261 AF2-120 C Adder 6.55 MW 5.57 MW
962491 AG1-098 C Adder 11.39 MW 9.68 MW
962561 AG1-105 C Adder 8.51 MW 7.23 MW
964241 AG1-285 C Adder 12.17 MW 10.35 MW
965281 AG1-393 C 80/20 2.44 MW 2.44 MW
313764 3SOCKMAN Adder 0.74 MW 0.63 MW
934321 AD1-056 C Adder 6.39 MW 5.43 MW
934331 AD1-057 C Adder 3.56 MW 3.03 MW
934501 AD1-074 C Adder 36.47 MW 31.0 MW
934511 AD1-075 C Adder 9.12 MW 7.75 MW
935161 AD1-151 C Adder 18.17 MW 15.44 MW
938531 AE1-072 C Adder 19.71 MW 16.75 MW
939191 AE1-149 C 80/20 12.16 MW 12.16 MW
939261 AE1-157 C Adder 14.11 MW 11.99 MW
940431 AE2-027 C 80/20 14.62 MW 14.62 MW
940481 AE2-033 C Adder 17.45 MW 14.83 MW
940541 AE2-040 C Adder 3.1 MW 2.64 MW
940551 AE2-041 C Adder 7.62 MW 6.47 MW
940641 AE2-051 C 80/20 18.89 MW 18.89 MW
941101 AE2-104 C Adder 3.76 MW 3.19 MW
942461 AE2-259 C Adder 9.42 MW 8.01 MW
943471 AF1-018 C Adder 7.62 MW 6.47 MW
944641 AF1-129 C 80/20 115.89 MW 115.89 MW
315085 1SPRUNCC 80/20 0.19 MW 0.19 MW
315086 1SPRUNCD 80/20 0.19 MW 0.19 MW
316303 AF2-085 80/20 4.45 MW 4.45 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 30.69 MW 30.69 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 23.32 MW 23.32 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 96.7 MW 96.7 MW
NY PJM->LTFIMP_NY CLTF 2.7 MW 2.7 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.33 MW 1.33 MW
WEC LTFEXP_WEC->PJM CLTF 0.65 MW 0.65 MW
CPLE LTFEXP_CPLE->PJM CLTF 11.35 MW 11.35 MW
TVA LTFEXP_TVA->PJM CLTF 6.41 MW 6.41 MW
MEC LTFEXP_MEC->PJM CLTF 4.04 MW 4.04 MW
LAGN LTFEXP_LAGN->PJM CLTF 8.02 MW 8.02 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.26 MW 0.26 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.41 MW 5.41 MW

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 113.8 %
Rating: 4070.2 MVA
Rating Type: B
MVA to Mitigate: 4632.05 MVA
MW Contribution: 79.0 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.45 MW 1.23 MW
961941 AG1-037 C Adder 0.82 MW 0.7 MW
962331 AG1-082 C Adder 3.29 MW 2.79 MW
963041 AG1-153 C Adder 8.3 MW 7.06 MW
966801 AG1-551 C Adder 3.36 MW 2.86 MW
966811 AG1-552 C Adder 3.22 MW 2.73 MW
965291 AG1-394 C Adder 1.4 MW 1.19 MW
966621 AG1-532 C Adder 2.18 MW 1.85 MW
934521 AD1-076 C Adder 20.42 MW 17.36 MW
944011 AF1-069 C Adder 19.36 MW 16.46 MW
960081 AF2-299 C Adder 2.9 MW 2.47 MW
939181 AE1-148 C Adder 12.96 MW 11.02 MW
941031 AE2-094 C Adder 59.26 MW 50.37 MW
946281 AF1-292 C Adder 2.4 MW 2.04 MW
957481 AF2-042 C Adder 77.81 MW 66.14 MW
957521 AF2-046 C Adder 23.18 MW 19.71 MW
957861 AF2-080 C Adder 11.93 MW 10.14 MW
938771 AE1-103 C Adder 4.98 MW 4.23 MW
314229 6MT RD221 80/20 0.22 MW 0.22 MW
314236 6NRTHEST 80/20 0.33 MW 0.33 MW
314309 6IRON208 80/20 0.79 MW 0.79 MW
314421 6WINCHST 80/20 0.24 MW 0.24 MW
314507 3THOMPSN Adder 3.57 MW 3.03 MW
315060 1CHESTF5 80/20 114.01 MW 114.01 MW
315061 1CHESTG7 80/20 6.93 MW 6.93 MW
315062 1CHESTS7 80/20 3.18 MW 3.18 MW
315063 1CHESTG8 80/20 6.82 MW 6.82 MW
315064 1CHESTS8 80/20 3.51 MW 3.51 MW
315065 1CHESTF6 Adder 34.49 MW 29.32 MW
315067 1DARBY 1 80/20 4.57 MW 4.57 MW
315068 1DARBY 2 80/20 4.58 MW 4.58 MW
315069 1DARBY 3 80/20 4.59 MW 4.59 MW
315070 1DARBY 4 80/20 4.6 MW 4.6 MW
315073 1STONECA 80/20 12.28 MW 12.28 MW
315076 1HOPPOLC 80/20 2.72 MW 2.72 MW
315077 1HOPHCF1 80/20 4.32 MW 4.32 MW
315078 1HOPHCF2 80/20 4.32 MW 4.32 MW
315079 1HOPHCF3 80/20 4.32 MW 4.32 MW
315080 1HOPHCF4 80/20 6.56 MW 6.56 MW
315083 1SPRUNCA Adder 15.79 MW 13.42 MW
315084 1SPRUNCB Adder 15.79 MW 13.42 MW
315092 1YORKTN3 80/20 239.44 MW 239.44 MW
936591 AD2-074 C Adder 8.71 MW 7.4 MW
942341 AE2-247 C Adder 2.6 MW 2.21 MW
943461 AF1-017 C Adder 2.35 MW 2.0 MW
943741 AF1-042 C Adder 4.56 MW 3.87 MW
961951 AG1-038 C Adder 5.04 MW 4.28 MW
966661 AG1-536 C Adder 8.21 MW 6.98 MW
966871 AG1-558 C Adder 4.08 MW 3.47 MW
315116 1SURRY 1 80/20 43.8 MW 43.8 MW
315119 1GRAVEL3 80/20 4.45 MW 4.45 MW
315120 1GRAVEL4 80/20 4.51 MW 4.51 MW
315122 1GRAVEL6 80/20 4.5 MW 4.5 MW
315233 1SURRY 2 80/20 45.83 MW 45.83 MW
315260 1GOSPORTA Adder 3.76 MW 3.2 MW
315261 1GOSPORTB Adder 4.81 MW 4.09 MW
315262 1GOSPORTC Adder 4.08 MW 3.47 MW
316075 AC2-137 C 80/20 0.69 MW 0.69 MW
316132 AB2-190 C 80/20 7.37 MW 7.37 MW
957601 AF2-054 C Adder 3.56 MW 3.03 MW
962861 AG1-135 C Adder 9.32 MW 7.92 MW
962971 AG1-146 C Adder 4.9 MW 4.16 MW
962981 AG1-147 C Adder 11.43 MW 9.72 MW
963611 AG1-210 C Adder 0.96 MW 0.81 MW
964211 AG1-282 C Adder 2.98 MW 2.54 MW
942001 AE2-212 C Adder 3.74 MW 3.18 MW
957871 AF2-081 C Adder 17.52 MW 14.89 MW
958161 AF2-110 C Adder 2.38 MW 2.03 MW
926071 AC1-086 C Adder 32.98 MW 28.04 MW
927021 AC1-189 C Adder 13.13 MW 11.16 MW
933291 AC2-141 C 80/20 54.36 MW 54.36 MW
934621 AD1-088 C Adder 18.12 MW 15.4 MW
939411 AE1-173 C Adder 145.79 MW 123.92 MW
934011 AD1-025 C 80/20 4.61 MW 4.61 MW
927041 AC1-191 C Adder 16.4 MW 13.94 MW
933981 AD1-022 C Adder 14.55 MW 12.37 MW
961681 AG1-008 C Adder 23.18 MW 19.71 MW
962571 AG1-106 C Adder 4.27 MW 3.63 MW
316004 AC1-112 C 80/20 0.6 MW 0.6 MW
316159 AE1-175 C 80/20 0.71 MW 0.71 MW
316169 AC1-164 GEN 80/20 73.92 MW 73.92 MW
316233 AE1-074 C Adder 4.09 MW 3.48 MW
316240 AF1-291 C Adder 3.78 MW 3.21 MW
316274 AC1-208 C Adder 14.05 MW 11.94 MW
316294 AC1-161 C 80/20 8.85 MW 8.85 MW
316312 AB1-027 C 80/20 0.96 MW 0.96 MW
316336 AC2-165 C Adder 13.93 MW 11.84 MW
316369 AC1-216 C 80/20 2.85 MW 2.85 MW
316382 AG1-145 C 80/20 0.64 MW 0.64 MW
316033 AB2-134 GEN 80/20 3.73 MW 3.73 MW
316311 AC2-079 C Adder 9.99 MW 8.49 MW
316349 AD2-085 C Adder 5.99 MW 5.09 MW
961611 AG1-000B C 80/20 28.36 MW 28.36 MW
941591 AE2-156 C Adder 31.66 MW 26.91 MW
944581 AF1-123 C Adder 80.24 MW 68.2 MW
944591 AF1-124 C Adder 80.52 MW 68.44 MW
944601 AF1-125 C Adder 79.0 MW 67.15 MW
944631 AF1-128 C 80/20 71.34 MW 71.34 MW
958261 AF2-120 C Adder 9.55 MW 8.12 MW
962491 AG1-098 C Adder 16.22 MW 13.79 MW
965281 AG1-393 C Adder 3.76 MW 3.19 MW
313764 3SOCKMAN Adder 1.11 MW 0.95 MW
934321 AD1-056 C Adder 9.66 MW 8.21 MW
934331 AD1-057 C Adder 5.39 MW 4.58 MW
934501 AD1-074 C Adder 56.23 MW 47.8 MW
934511 AD1-075 C Adder 14.06 MW 11.95 MW
935161 AD1-151 C 80/20 28.73 MW 28.73 MW
938531 AE1-072 C Adder 30.78 MW 26.16 MW
939191 AE1-149 C Adder 18.61 MW 15.82 MW
940431 AE2-027 C Adder 22.59 MW 19.2 MW
940481 AE2-033 C Adder 25.65 MW 21.8 MW
940541 AE2-040 C Adder 4.56 MW 3.87 MW
940551 AE2-041 C Adder 12.16 MW 10.34 MW
940641 AE2-051 C Adder 26.98 MW 22.94 MW
941101 AE2-104 C Adder 5.84 MW 4.97 MW
943471 AF1-018 C Adder 12.16 MW 10.34 MW
944641 AF1-129 C Adder 179.89 MW 152.91 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 84.24 MW 84.24 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 48.64 MW 48.64 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 156.7 MW 156.7 MW
NY PJM->LTFIMP_NY CLTF 4.13 MW 4.13 MW
LGEE LTFEXP_LGEE->PJM CLTF 3.35 MW 3.35 MW
WEC LTFEXP_WEC->PJM CLTF 1.73 MW 1.73 MW
CPLE LTFEXP_CPLE->PJM CLTF 17.61 MW 17.61 MW
TVA LTFEXP_TVA->PJM CLTF 12.4 MW 12.4 MW
MEC LTFEXP_MEC->PJM CLTF 9.56 MW 9.56 MW
LAGN LTFEXP_LAGN->PJM CLTF 15.45 MW 15.45 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.62 MW 0.62 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.41 MW 8.41 MW

Details for 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 594_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
Contingency Name:
DVP_P1-2: LN 594_SRT-S
CONTINGENCY 'DVP_P1-2: LN 594_SRT-S'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 113.06 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3640.94 MVA
MW Contribution: 31.58 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C 80/20 1.44 MW 1.44 MW
961941 AG1-037 C Adder 0.37 MW 0.32 MW
962331 AG1-082 C Adder 1.49 MW 1.27 MW
963041 AG1-153 C 80/20 5.14 MW 5.14 MW
963171 AG1-166 C 80/20 0.8 MW 0.8 MW
963181 AG1-167 C 80/20 0.6 MW 0.6 MW
963191 AG1-168 C 80/20 0.6 MW 0.6 MW
964791 AG1-342 C Adder 2.78 MW 2.36 MW
966801 AG1-551 C Adder 1.55 MW 1.31 MW
966811 AG1-552 C Adder 1.57 MW 1.33 MW
965291 AG1-394 C Adder 0.63 MW 0.54 MW
966621 AG1-532 C 80/20 1.09 MW 1.09 MW
313853 3PONTONDP 80/20 0.53 MW 0.53 MW
314429 3JTRSVLE 80/20 0.33 MW 0.33 MW
314704 3LAWRENC 80/20 0.24 MW 0.24 MW
315153 1CLOVER1 80/20 10.84 MW 10.84 MW
315154 1CLOVER2 80/20 10.74 MW 10.74 MW
934521 AD1-076 C Adder 8.86 MW 7.53 MW
944011 AF1-069 C 80/20 12.13 MW 12.13 MW
959311 AF2-222 C 80/20 13.33 MW 13.33 MW
960061 AF2-297 C Adder 6.01 MW 5.11 MW
960081 AF2-299 C 80/20 1.46 MW 1.46 MW
316131 AB2-060 C 80/20 1.18 MW 1.18 MW
938371 AE1-056 C 80/20 5.17 MW 5.17 MW
939181 AE1-148 C 80/20 7.15 MW 7.15 MW
941031 AE2-094 C 80/20 37.13 MW 37.13 MW
946281 AF1-292 C 80/20 1.21 MW 1.21 MW
946301 AF1-294 C 80/20 2.96 MW 2.96 MW
957481 AF2-042 C 80/20 47.1 MW 47.1 MW
957521 AF2-046 C Adder 10.48 MW 8.91 MW
958211 AF2-115 C 80/20 1.8 MW 1.8 MW
938771 AE1-103 C Adder 2.1 MW 1.79 MW
314507 3THOMPSN Adder 1.4 MW 1.19 MW
934861 AD1-115 C 80/20 3.31 MW 3.31 MW
942341 AE2-247 C Adder 1.04 MW 0.88 MW
943461 AF1-017 C Adder 0.94 MW 0.8 MW
315102 1BRUNSWICKG1 80/20 7.56 MW 7.56 MW
315103 1BRUNSWICKG2 80/20 7.56 MW 7.56 MW
315104 1BRUNSWICKG3 80/20 7.56 MW 7.56 MW
315105 1BRUNSWICKS1 80/20 15.71 MW 15.71 MW
315172 1LOISA A 80/20 3.33 MW 3.33 MW
315173 1LOISA B 80/20 3.35 MW 3.35 MW
315174 1LOISA C 80/20 3.35 MW 3.35 MW
315175 1LOISA D 80/20 3.35 MW 3.35 MW
315176 1LOISA E 80/20 6.83 MW 6.83 MW
315177 1S ANNAG1 80/20 3.26 MW 3.26 MW
315178 1S ANNAS1 80/20 1.68 MW 1.68 MW
315179 1S ANNAG2 80/20 3.26 MW 3.26 MW
315180 1S ANNAS2 80/20 1.68 MW 1.68 MW
315225 1N ANNA1 80/20 103.94 MW 103.94 MW
315226 1N ANNA2 80/20 103.97 MW 103.97 MW
315241 1Z1-086 GT1 80/20 9.7 MW 9.7 MW
315242 1Z1-086 GT2 80/20 9.7 MW 9.7 MW
315243 1Z1-086 GT3 80/20 9.7 MW 9.7 MW
315244 1Z1-086 ST 80/20 16.88 MW 16.88 MW
315260 1GOSPORTA Adder 1.48 MW 1.26 MW
315261 1GOSPORTB Adder 1.89 MW 1.61 MW
315262 1GOSPORTC Adder 1.6 MW 1.36 MW
966001 AG1-469 C 80/20 2.38 MW 2.38 MW
957871 AF2-081 C Adder 7.02 MW 5.96 MW
958161 AF2-110 C Adder 0.96 MW 0.82 MW
926071 AC1-086 C Adder 16.0 MW 13.6 MW
936261 AD2-033 C 80/20 10.39 MW 10.39 MW
933291 AC2-141 C Adder 21.06 MW 17.9 MW
934621 AD1-088 C 80/20 10.92 MW 10.92 MW
939411 AE1-173 C 80/20 78.16 MW 78.16 MW
933981 AD1-022 C Adder 6.36 MW 5.41 MW
961681 AG1-008 C Adder 10.48 MW 8.91 MW
962571 AG1-106 C Adder 2.07 MW 1.76 MW
208900 BRIS G1 80/20 -2.4 MW -2.4 MW
208901 BRIS G2 80/20 -2.85 MW -2.85 MW
316023 AB2-100 C2 80/20 0.75 MW 0.75 MW
316034 AC1-036 C 80/20 0.19 MW 0.19 MW
316164 AC1-076_C 80/20 1.09 MW 1.09 MW
316170 AC1-121 C 80/20 2.95 MW 2.95 MW
316192 AB2-158 C 80/20 4.33 MW 4.33 MW
316233 AE1-074 C 80/20 2.07 MW 2.07 MW
316237 AB2-079 C O1 80/20 0.26 MW 0.26 MW
316238 AB2-078 C O1 80/20 0.26 MW 0.26 MW
316239 AB2-077 C O1 80/20 0.26 MW 0.26 MW
316254 AC1-120 C 80/20 8.59 MW 8.59 MW
316257 AC1-043 C 80/20 6.62 MW 6.62 MW
316258 AE1-075 C 80/20 0.32 MW 0.32 MW
316274 AC1-208 C Adder 6.78 MW 5.77 MW
316313 AB2-026 C 80/20 0.35 MW 0.35 MW
316315 AB2-025 C 80/20 0.33 MW 0.33 MW
316336 AC2-165 C 80/20 8.9 MW 8.9 MW
316365 AB2-100 C1 80/20 0.75 MW 0.75 MW
316405 AF2-144 C 80/20 0.27 MW 0.27 MW
313527 AB2-043 C 80/20 0.41 MW 0.41 MW
316087 AB2-174 C 80/20 0.91 MW 0.91 MW
316044 AC1-158 C1 80/20 18.52 MW 18.52 MW
316045 AC1-158 C2 80/20 18.52 MW 18.52 MW
316311 AC2-079 C Adder 4.0 MW 3.4 MW
316349 AD2-085 C Adder 2.4 MW 2.04 MW
941591 AE2-156 C Adder 12.44 MW 10.58 MW
944581 AF1-123 C Adder 32.07 MW 27.26 MW
944591 AF1-124 C Adder 32.18 MW 27.36 MW
944601 AF1-125 C Adder 31.58 MW 26.84 MW
962491 AG1-098 C 80/20 9.79 MW 9.79 MW
962561 AG1-105 C Adder 6.98 MW 5.93 MW
964241 AG1-285 C 80/20 9.99 MW 9.99 MW
313764 3SOCKMAN Adder 0.55 MW 0.47 MW
934321 AD1-056 C Adder 4.71 MW 4.0 MW
934331 AD1-057 C Adder 2.63 MW 2.23 MW
934501 AD1-074 C Adder 24.4 MW 20.74 MW
934511 AD1-075 C Adder 6.1 MW 5.18 MW
934611 AD1-087 C 80/20 1.07 MW 1.07 MW
935171 AD1-152 C 80/20 1.1 MW 1.1 MW
937481 AD2-202 C 80/20 0.31 MW 0.31 MW
938531 AE1-072 C Adder 12.34 MW 10.49 MW
939191 AE1-149 C Adder 7.3 MW 6.2 MW
940481 AE2-033 C 80/20 12.92 MW 12.92 MW
940541 AE2-040 C 80/20 2.3 MW 2.3 MW
940641 AE2-051 C 80/20 15.77 MW 15.77 MW
941101 AE2-104 C Adder 2.36 MW 2.0 MW
942461 AE2-259 C 80/20 8.01 MW 8.01 MW
316303 AF2-085 80/20 3.88 MW 3.88 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 19.16 MW 19.16 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.11 MW 16.11 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 73.83 MW 73.83 MW
NY PJM->LTFIMP_NY CLTF 2.29 MW 2.29 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.83 MW 0.83 MW
WEC LTFEXP_WEC->PJM CLTF 0.41 MW 0.41 MW
CPLE LTFEXP_CPLE->PJM CLTF 8.86 MW 8.86 MW
TVA LTFEXP_TVA->PJM CLTF 4.52 MW 4.52 MW
MEC LTFEXP_MEC->PJM CLTF 2.66 MW 2.66 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.7 MW 5.7 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.17 MW 0.17 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.22 MW 4.22 MW

Details for 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 573_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
Contingency Name:
DVP_P1-2: LN 573_SRT-A
CONTINGENCY 'DVP_P1-2: LN 573_SRT-A'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 111.16 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3579.93 MVA
MW Contribution: 33.6 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.74 MW 0.63 MW
961791 AG1-021 C 80/20 1.5 MW 1.5 MW
961941 AG1-037 C Adder 0.39 MW 0.34 MW
962331 AG1-082 C Adder 1.58 MW 1.34 MW
963041 AG1-153 C 80/20 5.39 MW 5.39 MW
963171 AG1-166 C 80/20 0.83 MW 0.83 MW
963181 AG1-167 C 80/20 0.63 MW 0.63 MW
963191 AG1-168 C 80/20 0.63 MW 0.63 MW
964791 AG1-342 C Adder 2.91 MW 2.48 MW
966801 AG1-551 C Adder 1.64 MW 1.39 MW
966811 AG1-552 C Adder 1.66 MW 1.41 MW
965291 AG1-394 C Adder 0.67 MW 0.57 MW
966621 AG1-532 C 80/20 1.15 MW 1.15 MW
313506 AB1-173 C OP 80/20 0.92 MW 0.92 MW
313853 3PONTONDP 80/20 0.56 MW 0.56 MW
314429 3JTRSVLE 80/20 0.34 MW 0.34 MW
314704 3LAWRENC 80/20 0.25 MW 0.25 MW
315131 1EDGECMA Adder 12.22 MW 10.39 MW
315153 1CLOVER1 80/20 11.36 MW 11.36 MW
315154 1CLOVER2 80/20 11.25 MW 11.25 MW
934521 AD1-076 C Adder 9.4 MW 7.99 MW
944011 AF1-069 C 80/20 12.72 MW 12.72 MW
959311 AF2-222 C 80/20 13.93 MW 13.93 MW
960061 AF2-297 C Adder 6.31 MW 5.37 MW
960081 AF2-299 C 80/20 1.54 MW 1.54 MW
316131 AB2-060 C 80/20 1.24 MW 1.24 MW
938371 AE1-056 C 80/20 5.4 MW 5.4 MW
939181 AE1-148 C 80/20 7.51 MW 7.51 MW
941031 AE2-094 C 80/20 38.93 MW 38.93 MW
946281 AF1-292 C 80/20 1.27 MW 1.27 MW
946301 AF1-294 C 80/20 3.09 MW 3.09 MW
957481 AF2-042 C 80/20 49.36 MW 49.36 MW
957521 AF2-046 C Adder 11.1 MW 9.44 MW
957861 AF2-080 C Adder 5.98 MW 5.08 MW
958211 AF2-115 C 80/20 1.88 MW 1.88 MW
938771 AE1-103 C Adder 2.23 MW 1.9 MW
314507 3THOMPSN Adder 1.49 MW 1.27 MW
315083 1SPRUNCA Adder 6.17 MW 5.24 MW
315084 1SPRUNCB Adder 6.17 MW 5.24 MW
942341 AE2-247 C Adder 1.11 MW 0.94 MW
943461 AF1-017 C Adder 1.0 MW 0.85 MW
315102 1BRUNSWICKG1 80/20 7.93 MW 7.93 MW
315103 1BRUNSWICKG2 80/20 7.93 MW 7.93 MW
315104 1BRUNSWICKG3 80/20 7.93 MW 7.93 MW
315105 1BRUNSWICKS1 80/20 16.47 MW 16.47 MW
315172 1LOISA A 80/20 3.08 MW 3.08 MW
315173 1LOISA B 80/20 3.1 MW 3.1 MW
315174 1LOISA C 80/20 3.1 MW 3.1 MW
315175 1LOISA D 80/20 3.1 MW 3.1 MW
315176 1LOISA E 80/20 6.31 MW 6.31 MW
315177 1S ANNAG1 80/20 3.04 MW 3.04 MW
315178 1S ANNAS1 80/20 1.56 MW 1.56 MW
315179 1S ANNAG2 80/20 3.04 MW 3.04 MW
315180 1S ANNAS2 80/20 1.56 MW 1.56 MW
315225 1N ANNA1 80/20 106.97 MW 106.97 MW
315226 1N ANNA2 80/20 107.01 MW 107.01 MW
315241 1Z1-086 GT1 80/20 10.17 MW 10.17 MW
315242 1Z1-086 GT2 80/20 10.17 MW 10.17 MW
315243 1Z1-086 GT3 80/20 10.17 MW 10.17 MW
315244 1Z1-086 ST 80/20 17.7 MW 17.7 MW
315260 1GOSPORTA Adder 1.58 MW 1.34 MW
315261 1GOSPORTB Adder 2.01 MW 1.71 MW
315262 1GOSPORTC Adder 1.71 MW 1.45 MW
966001 AG1-469 C 80/20 1.98 MW 1.98 MW
942001 AE2-212 C Adder 1.5 MW 1.27 MW
957871 AF2-081 C Adder 7.46 MW 6.34 MW
958161 AF2-110 C Adder 1.02 MW 0.87 MW
926071 AC1-086 C Adder 16.9 MW 14.37 MW
927021 AC1-189 C Adder 6.58 MW 5.59 MW
936261 AD2-033 C 80/20 10.87 MW 10.87 MW
933291 AC2-141 C Adder 22.43 MW 19.07 MW
934621 AD1-088 C 80/20 11.44 MW 11.44 MW
939411 AE1-173 C 80/20 82.31 MW 82.31 MW
933981 AD1-022 C Adder 6.75 MW 5.74 MW
961681 AG1-008 C Adder 11.1 MW 9.44 MW
962571 AG1-106 C Adder 2.19 MW 1.86 MW
208900 BRIS G1 80/20 -2.41 MW -2.41 MW
208901 BRIS G2 80/20 -2.86 MW -2.86 MW
316023 AB2-100 C2 80/20 0.79 MW 0.79 MW
316034 AC1-036 C 80/20 0.2 MW 0.2 MW
316192 AB2-158 C 80/20 4.28 MW 4.28 MW
316233 AE1-074 C 80/20 2.18 MW 2.18 MW
316237 AB2-079 C O1 80/20 0.27 MW 0.27 MW
316238 AB2-078 C O1 80/20 0.27 MW 0.27 MW
316239 AB2-077 C O1 80/20 0.27 MW 0.27 MW
316240 AF1-291 C Adder 1.38 MW 1.17 MW
316258 AE1-075 C 80/20 0.33 MW 0.33 MW
316263 AC1-034 C Adder 5.23 MW 4.45 MW
316274 AC1-208 C Adder 7.17 MW 6.09 MW
316313 AB2-026 C 80/20 0.36 MW 0.36 MW
316315 AB2-025 C 80/20 0.34 MW 0.34 MW
316336 AC2-165 C 80/20 9.25 MW 9.25 MW
316365 AB2-100 C1 80/20 0.79 MW 0.79 MW
316405 AF2-144 C 80/20 0.28 MW 0.28 MW
316181 AB2-040 GEN 80/20 1.03 MW 1.03 MW
313527 AB2-043 C 80/20 0.43 MW 0.43 MW
316087 AB2-174 C 80/20 0.96 MW 0.96 MW
316311 AC2-079 C Adder 4.26 MW 3.62 MW
316349 AD2-085 C Adder 2.55 MW 2.17 MW
961611 AG1-000B C Adder 10.32 MW 8.77 MW
941591 AE2-156 C Adder 13.25 MW 11.26 MW
944581 AF1-123 C Adder 34.12 MW 29.0 MW
944591 AF1-124 C Adder 34.24 MW 29.11 MW
944601 AF1-125 C Adder 33.6 MW 28.56 MW
962491 AG1-098 C 80/20 10.24 MW 10.24 MW
962561 AG1-105 C Adder 7.32 MW 6.22 MW
964241 AG1-285 C 80/20 10.46 MW 10.46 MW
965281 AG1-393 C Adder 1.42 MW 1.21 MW
313764 3SOCKMAN Adder 0.58 MW 0.49 MW
934321 AD1-056 C Adder 4.98 MW 4.23 MW
934331 AD1-057 C Adder 2.78 MW 2.36 MW
934501 AD1-074 C Adder 25.89 MW 22.0 MW
934511 AD1-075 C Adder 6.47 MW 5.5 MW
934611 AD1-087 C 80/20 1.12 MW 1.12 MW
935171 AD1-152 C 80/20 1.15 MW 1.15 MW
937481 AD2-202 C 80/20 0.33 MW 0.33 MW
938531 AE1-072 C Adder 13.13 MW 11.16 MW
939191 AE1-149 C Adder 7.78 MW 6.61 MW
940431 AE2-027 C Adder 8.32 MW 7.07 MW
940481 AE2-033 C 80/20 13.64 MW 13.64 MW
940541 AE2-040 C 80/20 2.43 MW 2.43 MW
940641 AE2-051 C 80/20 16.56 MW 16.56 MW
941101 AE2-104 C Adder 2.51 MW 2.13 MW
942461 AE2-259 C Adder 8.33 MW 7.08 MW
316303 AF2-085 80/20 4.06 MW 4.06 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 22.2 MW 22.2 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 17.64 MW 17.64 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 78.28 MW 78.28 MW
NY PJM->LTFIMP_NY CLTF 2.29 MW 2.29 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.95 MW 0.95 MW
WEC LTFEXP_WEC->PJM CLTF 0.47 MW 0.47 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.36 MW 9.36 MW
TVA LTFEXP_TVA->PJM CLTF 4.89 MW 4.89 MW
MEC LTFEXP_MEC->PJM CLTF 2.98 MW 2.98 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.17 MW 6.17 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.19 MW 0.19 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.46 MW 4.46 MW

Details for 6FOUR RIVERS-6STJOHN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FOUR RIVERS-6STJOHN 230.0 kV Ckt 1 line
314212 to 314150 ckt 1
Contingency Name:
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 108.9 %
Rating: 1123.3 MVA
Rating Type: B
MVA to Mitigate: 1223.33 MVA
MW Contribution: 20.38 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314229 6MT RD221 80/20 0.1 MW 0.1 MW
314236 6NRTHEST 80/20 0.13 MW 0.13 MW
314309 6IRON208 80/20 0.29 MW 0.29 MW
314507 3THOMPSN Adder 0.94 MW 0.8 MW
315060 1CHESTF5 80/20 39.42 MW 39.42 MW
315061 1CHESTG7 80/20 2.4 MW 2.4 MW
315062 1CHESTS7 80/20 1.1 MW 1.1 MW
315063 1CHESTG8 80/20 2.36 MW 2.36 MW
315064 1CHESTS8 80/20 1.21 MW 1.21 MW
315065 1CHESTF6 80/20 11.97 MW 11.97 MW
315067 1DARBY 1 80/20 1.81 MW 1.81 MW
315068 1DARBY 2 80/20 1.81 MW 1.81 MW
315069 1DARBY 3 80/20 1.82 MW 1.82 MW
315070 1DARBY 4 80/20 1.82 MW 1.82 MW
315073 1STONECA Adder 4.08 MW 3.47 MW
315077 1HOPHCF1 80/20 1.44 MW 1.44 MW
315078 1HOPHCF2 80/20 1.44 MW 1.44 MW
315079 1HOPHCF3 80/20 1.44 MW 1.44 MW
315080 1HOPHCF4 80/20 2.18 MW 2.18 MW
315083 1SPRUNCA 80/20 5.6 MW 5.6 MW
315084 1SPRUNCB 80/20 5.6 MW 5.6 MW
315092 1YORKTN3 Adder 67.42 MW 57.31 MW
942341 AE2-247 C Adder 0.72 MW 0.61 MW
943461 AF1-017 C Adder 0.65 MW 0.55 MW
966871 AG1-558 C 80/20 1.88 MW 1.88 MW
315260 1GOSPORTA Adder 0.99 MW 0.84 MW
315261 1GOSPORTB Adder 1.26 MW 1.07 MW
315262 1GOSPORTC Adder 1.07 MW 0.91 MW
316075 AC2-137 C 80/20 0.24 MW 0.24 MW
957601 AF2-054 C Adder 1.06 MW 0.9 MW
942001 AE2-212 C Adder 1.22 MW 1.04 MW
957871 AF2-081 C Adder 4.56 MW 3.87 MW
958161 AF2-110 C Adder 0.63 MW 0.54 MW
933291 AC2-141 C Adder 13.78 MW 11.71 MW
927041 AC1-191 C 80/20 7.55 MW 7.55 MW
316004 AC1-112 C 80/20 0.25 MW 0.25 MW
316169 AC1-164 GEN 80/20 24.59 MW 24.59 MW
316233 AE1-074 C Adder 1.31 MW 1.12 MW
316240 AF1-291 C 80/20 1.29 MW 1.29 MW
316312 AB1-027 C 80/20 0.39 MW 0.39 MW
315051 AA1-145 CT1 80/20 8.68 MW 8.68 MW
315052 AA1-145 CT2 80/20 8.68 MW 8.68 MW
316311 AC2-079 C Adder 2.74 MW 2.33 MW
316349 AD2-085 C Adder 1.65 MW 1.41 MW
961611 AG1-000B C Adder 8.39 MW 7.13 MW
941591 AE2-156 C Adder 8.3 MW 7.06 MW
944581 AF1-123 C Adder 20.7 MW 17.6 MW
944591 AF1-124 C Adder 20.77 MW 17.66 MW
944601 AF1-125 C Adder 20.38 MW 17.32 MW
944631 AF1-128 C 80/20 24.67 MW 24.67 MW
965281 AG1-393 C Adder 1.24 MW 1.05 MW
935161 AD1-151 C Adder 9.03 MW 7.68 MW
938531 AE1-072 C Adder 8.0 MW 6.8 MW
939191 AE1-149 C Adder 5.64 MW 4.79 MW
940431 AE2-027 C Adder 7.54 MW 6.41 MW
940551 AE2-041 C Adder 3.71 MW 3.15 MW
941101 AE2-104 C Adder 1.55 MW 1.32 MW
943471 AF1-018 C Adder 3.71 MW 3.15 MW
944641 AF1-129 C 80/20 62.45 MW 62.45 MW
315043 1FOUR RIVERA 80/20 5.45 MW 5.45 MW
315044 1FOUR RIVERB 80/20 5.45 MW 5.45 MW
315045 1FOUR RIVERC 80/20 6.66 MW 6.66 MW
315046 1FOUR RIVERD 80/20 5.37 MW 5.37 MW
315047 1FOUR RIVERE 80/20 5.37 MW 5.37 MW
315048 1FOUR RIVERF 80/20 6.56 MW 6.56 MW
315085 1SPRUNCC 80/20 0.1 MW 0.1 MW
315086 1SPRUNCD 80/20 0.1 MW 0.1 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 19.18 MW 19.18 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.33 MW 11.33 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 37.13 MW 37.13 MW
NY PJM->LTFIMP_NY CLTF 1.14 MW 1.14 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.77 MW 0.77 MW
WEC LTFEXP_WEC->PJM CLTF 0.4 MW 0.4 MW
CPLE LTFEXP_CPLE->PJM CLTF 4.19 MW 4.19 MW
TVA LTFEXP_TVA->PJM CLTF 2.91 MW 2.91 MW
MEC LTFEXP_MEC->PJM CLTF 2.2 MW 2.2 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.62 MW 3.62 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.14 MW 0.14 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.0 MW 2.0 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Contingency Name:
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 103.22 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3324.19 MVA
MW Contribution: 61.0 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.25 MW 1.06 MW
961791 AG1-021 C Adder 1.83 MW 1.55 MW
961941 AG1-037 C Adder 0.67 MW 0.57 MW
962331 AG1-082 C Adder 2.69 MW 2.29 MW
963041 AG1-153 C 80/20 9.14 MW 9.14 MW
963171 AG1-166 C Adder 1.01 MW 0.86 MW
963181 AG1-167 C Adder 0.76 MW 0.65 MW
963191 AG1-168 C Adder 0.76 MW 0.65 MW
964791 AG1-342 C Adder 4.43 MW 3.77 MW
966801 AG1-551 C Adder 2.81 MW 2.39 MW
966811 AG1-552 C Adder 2.73 MW 2.32 MW
965291 AG1-394 C Adder 1.13 MW 0.96 MW
966621 AG1-532 C 80/20 1.86 MW 1.86 MW
313506 AB1-173 C OP 80/20 1.49 MW 1.49 MW
313853 3PONTONDP Adder 0.68 MW 0.57 MW
315131 1EDGECMA Adder 20.59 MW 17.5 MW
315153 1CLOVER1 80/20 17.95 MW 17.95 MW
315154 1CLOVER2 80/20 17.78 MW 17.78 MW
934521 AD1-076 C Adder 16.37 MW 13.92 MW
944011 AF1-069 C 80/20 21.71 MW 21.71 MW
959311 AF2-222 C Adder 18.29 MW 15.54 MW
960061 AF2-297 C Adder 9.89 MW 8.4 MW
960081 AF2-299 C 80/20 2.48 MW 2.48 MW
938371 AE1-056 C Adder 6.34 MW 5.39 MW
939181 AE1-148 C Adder 11.53 MW 9.8 MW
940491 AE2-034 C 80/20 1.54 MW 1.54 MW
941031 AE2-094 C 80/20 66.45 MW 66.45 MW
946281 AF1-292 C 80/20 2.06 MW 2.06 MW
946301 AF1-294 C Adder 3.75 MW 3.19 MW
957481 AF2-042 C 80/20 78.71 MW 78.71 MW
957521 AF2-046 C Adder 18.88 MW 16.04 MW
957861 AF2-080 C Adder 10.17 MW 8.64 MW
958211 AF2-115 C Adder 2.28 MW 1.94 MW
938771 AE1-103 C 80/20 3.87 MW 3.87 MW
313526 AB2-022 C 80/20 0.5 MW 0.5 MW
314507 3THOMPSN 80/20 2.68 MW 2.68 MW
315092 1YORKTN3 Adder 141.68 MW 120.43 MW
942341 AE2-247 C Adder 1.88 MW 1.6 MW
943461 AF1-017 C Adder 1.7 MW 1.45 MW
315098 1CHESPKA 80/20 0.58 MW 0.58 MW
315099 1CHESPKB 80/20 0.96 MW 0.96 MW
315102 1BRUNSWICKG1 80/20 13.45 MW 13.45 MW
315103 1BRUNSWICKG2 80/20 13.45 MW 13.45 MW
315104 1BRUNSWICKG3 80/20 13.45 MW 13.45 MW
315105 1BRUNSWICKS1 80/20 27.93 MW 27.93 MW
315108 1ELIZAR1 80/20 4.26 MW 4.26 MW
315109 1ELIZAR2 80/20 4.18 MW 4.18 MW
315110 1ELIZAR3 80/20 4.31 MW 4.31 MW
315115 1S HAMPT1 80/20 1.97 MW 1.97 MW
315241 1Z1-086 GT1 80/20 17.28 MW 17.28 MW
315242 1Z1-086 GT2 80/20 17.28 MW 17.28 MW
315243 1Z1-086 GT3 80/20 17.28 MW 17.28 MW
315244 1Z1-086 ST 80/20 30.08 MW 30.08 MW
315260 1GOSPORTA 80/20 2.83 MW 2.83 MW
315261 1GOSPORTB 80/20 3.62 MW 3.62 MW
315262 1GOSPORTC 80/20 3.07 MW 3.07 MW
315605 6W1-029WIND 80/20 1.04 MW 1.04 MW
315608 3AA2-088SOLA 80/20 1.41 MW 1.41 MW
315611 6Z1-036WIND 80/20 0.88 MW 0.88 MW
942001 AE2-212 C Adder 2.11 MW 1.8 MW
957871 AF2-081 C 80/20 13.43 MW 13.43 MW
958161 AF2-110 C 80/20 1.8 MW 1.8 MW
926071 AC1-086 C Adder 28.08 MW 23.86 MW
927021 AC1-189 C Adder 11.19 MW 9.52 MW
936261 AD2-033 C Adder 14.72 MW 12.52 MW
933291 AC2-141 C 80/20 41.9 MW 41.9 MW
934621 AD1-088 C 80/20 17.46 MW 17.46 MW
939411 AE1-173 C 80/20 144.1 MW 144.1 MW
916191 Z1-068 C 80/20 0.06 MW 0.06 MW
933981 AD1-022 C Adder 11.71 MW 9.96 MW
961681 AG1-008 C Adder 18.88 MW 16.04 MW
962571 AG1-106 C Adder 3.63 MW 3.09 MW
316023 AB2-100 C2 80/20 1.29 MW 1.29 MW
316036 AC1-147 C 80/20 0.49 MW 0.49 MW
316072 AD1-144 C 80/20 0.36 MW 0.36 MW
316185 AD1-033 C 80/20 1.65 MW 1.65 MW
316246 AF1-032 C 80/20 0.38 MW 0.38 MW
316263 AC1-034 C Adder 8.8 MW 7.48 MW
316274 AC1-208 C Adder 11.98 MW 10.19 MW
316294 AC1-161 C 80/20 6.82 MW 6.82 MW
316305 AF2-043 C 80/20 0.46 MW 0.46 MW
316315 AB2-025 C 80/20 0.56 MW 0.56 MW
316316 AC1-027 C 80/20 0.42 MW 0.42 MW
316320 Y1-086 C 80/20 0.29 MW 0.29 MW
316321 Z2-027 C 80/20 0.49 MW 0.49 MW
316365 AB2-100 C1 80/20 1.29 MW 1.29 MW
316017 AA1-139 ULT1 80/20 1.45 MW 1.45 MW
316018 AA1-139 ULT2 80/20 1.45 MW 1.45 MW
315614 AA2-178 C 80/20 2.09 MW 2.09 MW
316181 AB2-040 GEN 80/20 1.68 MW 1.68 MW
316087 AB2-174 C 80/20 1.56 MW 1.56 MW
316375 AC2-012 C 80/20 1.79 MW 1.79 MW
316311 AC2-079 C Adder 7.27 MW 6.18 MW
316349 AD2-085 C Adder 4.34 MW 3.69 MW
316388 AE2-253 GEN 80/20 2.63 MW 2.63 MW
961611 AG1-000B C Adder 17.07 MW 14.51 MW
941591 AE2-156 C 80/20 23.84 MW 23.84 MW
944581 AF1-123 C 80/20 61.95 MW 61.95 MW
944591 AF1-124 C 80/20 62.18 MW 62.18 MW
944601 AF1-125 C 80/20 61.0 MW 61.0 MW
962491 AG1-098 C 80/20 15.48 MW 15.48 MW
962561 AG1-105 C Adder 11.07 MW 9.41 MW
964241 AG1-285 C Adder 14.8 MW 12.58 MW
965281 AG1-393 C Adder 1.98 MW 1.68 MW
313764 3SOCKMAN Adder 0.95 MW 0.81 MW
934321 AD1-056 C Adder 8.33 MW 7.08 MW
934331 AD1-057 C Adder 4.65 MW 3.95 MW
934501 AD1-074 C Adder 45.08 MW 38.32 MW
934511 AD1-075 C Adder 11.27 MW 9.58 MW
934611 AD1-087 C 80/20 1.77 MW 1.77 MW
935161 AD1-151 C Adder 15.27 MW 12.98 MW
935171 AD1-152 C 80/20 1.83 MW 1.83 MW
937481 AD2-202 C 80/20 0.51 MW 0.51 MW
938531 AE1-072 C 80/20 23.61 MW 23.61 MW
939191 AE1-149 C Adder 11.99 MW 10.19 MW
940431 AE2-027 C Adder 11.4 MW 9.69 MW
940481 AE2-033 C 80/20 22.18 MW 22.18 MW
940541 AE2-040 C 80/20 3.94 MW 3.94 MW
940641 AE2-051 C 80/20 28.76 MW 28.76 MW
941101 AE2-104 C 80/20 4.41 MW 4.41 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 55.06 MW 55.06 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 35.38 MW 35.38 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 135.46 MW 135.46 MW
NY PJM->LTFIMP_NY CLTF 2.56 MW 2.56 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.18 MW 2.18 MW
WEC LTFEXP_WEC->PJM CLTF 1.13 MW 1.13 MW
CPLE LTFEXP_CPLE->PJM CLTF 15.91 MW 15.91 MW
TVA LTFEXP_TVA->PJM CLTF 9.31 MW 9.31 MW
MEC LTFEXP_MEC->PJM CLTF 6.56 MW 6.56 MW
LAGN LTFEXP_LAGN->PJM CLTF 11.74 MW 11.74 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.41 MW 0.41 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.59 MW 7.59 MW

Details for 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
Contingency Name:
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 102.06 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3286.74 MVA
MW Contribution: 39.21 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.42 MW 0.35 MW
962331 AG1-082 C Adder 1.66 MW 1.41 MW
963041 AG1-153 C Adder 4.27 MW 3.63 MW
966811 AG1-552 C Adder 1.64 MW 1.4 MW
965291 AG1-394 C Adder 0.71 MW 0.6 MW
966621 AG1-532 C Adder 1.12 MW 0.95 MW
934521 AD1-076 C Adder 10.28 MW 8.73 MW
944011 AF1-069 C Adder 9.93 MW 8.44 MW
960081 AF2-299 C Adder 1.49 MW 1.27 MW
941031 AE2-094 C Adder 30.4 MW 25.84 MW
946281 AF1-292 C Adder 1.23 MW 1.05 MW
957481 AF2-042 C Adder 40.42 MW 34.35 MW
957521 AF2-046 C Adder 11.73 MW 9.97 MW
938771 AE1-103 C Adder 2.5 MW 2.13 MW
314229 6MT RD221 80/20 0.11 MW 0.11 MW
314236 6NRTHEST 80/20 0.17 MW 0.17 MW
314309 6IRON208 80/20 0.4 MW 0.4 MW
314507 3THOMPSN Adder 1.77 MW 1.51 MW
315039 1LDYSMT3 80/20 4.42 MW 4.42 MW
315040 1LDYSMT4 80/20 4.43 MW 4.43 MW
315041 1LDYSMT5 80/20 4.44 MW 4.44 MW
315060 1CHESTF5 80/20 57.85 MW 57.85 MW
315061 1CHESTG7 80/20 3.52 MW 3.52 MW
315062 1CHESTS7 80/20 1.61 MW 1.61 MW
315063 1CHESTG8 80/20 3.46 MW 3.46 MW
315064 1CHESTS8 80/20 1.78 MW 1.78 MW
315065 1CHESTF6 Adder 17.75 MW 15.09 MW
315067 1DARBY 1 80/20 2.35 MW 2.35 MW
315068 1DARBY 2 80/20 2.35 MW 2.35 MW
315069 1DARBY 3 80/20 2.36 MW 2.36 MW
315070 1DARBY 4 80/20 2.37 MW 2.37 MW
315073 1STONECA Adder 6.25 MW 5.31 MW
315083 1SPRUNCA Adder 8.22 MW 6.99 MW
315084 1SPRUNCB Adder 8.22 MW 6.99 MW
315092 1YORKTN3 Adder 118.69 MW 100.89 MW
936591 AD2-074 C Adder 4.69 MW 3.99 MW
942341 AE2-247 C Adder 1.31 MW 1.11 MW
943461 AF1-017 C Adder 1.18 MW 1.0 MW
943741 AF1-042 C Adder 2.45 MW 2.09 MW
961951 AG1-038 C Adder 2.71 MW 2.31 MW
966661 AG1-536 C Adder 4.49 MW 3.82 MW
966871 AG1-558 C 80/20 2.2 MW 2.2 MW
966881 AG1-559 C 80/20 2.29 MW 2.29 MW
315225 1N ANNA1 80/20 26.09 MW 26.09 MW
315226 1N ANNA2 80/20 26.09 MW 26.09 MW
315260 1GOSPORTA Adder 1.87 MW 1.59 MW
315261 1GOSPORTB Adder 2.39 MW 2.03 MW
315262 1GOSPORTC Adder 2.03 MW 1.73 MW
316075 AC2-137 C 80/20 0.35 MW 0.35 MW
957411 AF2-035 C 80/20 8.26 MW 8.26 MW
957601 AF2-054 C Adder 1.84 MW 1.56 MW
962861 AG1-135 C Adder 5.08 MW 4.32 MW
962971 AG1-146 C Adder 2.62 MW 2.23 MW
962981 AG1-147 C Adder 6.11 MW 5.19 MW
963051 AG1-154 C 80/20 3.4 MW 3.4 MW
963611 AG1-210 C Adder 0.54 MW 0.46 MW
964211 AG1-282 C Adder 1.65 MW 1.41 MW
942001 AE2-212 C Adder 1.92 MW 1.63 MW
957871 AF2-081 C Adder 8.72 MW 7.41 MW
958161 AF2-110 C Adder 1.19 MW 1.01 MW
926071 AC1-086 C Adder 16.84 MW 14.31 MW
933291 AC2-141 C Adder 26.79 MW 22.77 MW
939411 AE1-173 C Adder 73.68 MW 62.63 MW
927041 AC1-191 C 80/20 8.82 MW 8.82 MW
933981 AD1-022 C Adder 7.33 MW 6.23 MW
961681 AG1-008 C Adder 11.73 MW 9.97 MW
962571 AG1-106 C Adder 2.18 MW 1.85 MW
316004 AC1-112 C 80/20 0.3 MW 0.3 MW
316169 AC1-164 GEN 80/20 36.81 MW 36.81 MW
316233 AE1-074 C Adder 2.16 MW 1.83 MW
316240 AF1-291 C Adder 1.94 MW 1.65 MW
316312 AB1-027 C 80/20 0.49 MW 0.49 MW
316336 AC2-165 C Adder 7.75 MW 6.59 MW
315037 1LDYSMT1 80/20 4.25 MW 4.25 MW
315038 1LDYSMT2 80/20 4.3 MW 4.3 MW
315051 AA1-145 CT1 80/20 4.7 MW 4.7 MW
315052 AA1-145 CT2 80/20 4.7 MW 4.7 MW
316311 AC2-079 C Adder 5.02 MW 4.26 MW
316349 AD2-085 C Adder 3.01 MW 2.56 MW
961611 AG1-000B C Adder 14.24 MW 12.1 MW
941591 AE2-156 C Adder 15.74 MW 13.38 MW
944581 AF1-123 C Adder 39.82 MW 33.85 MW
944591 AF1-124 C Adder 39.96 MW 33.97 MW
944601 AF1-125 C Adder 39.21 MW 33.33 MW
944631 AF1-128 C 80/20 36.2 MW 36.2 MW
958261 AF2-120 C Adder 5.22 MW 4.44 MW
965281 AG1-393 C Adder 1.93 MW 1.64 MW
313764 3SOCKMAN Adder 0.57 MW 0.48 MW
934501 AD1-074 C Adder 28.29 MW 24.05 MW
934511 AD1-075 C Adder 7.07 MW 6.01 MW
935161 AD1-151 C Adder 14.52 MW 12.34 MW
938531 AE1-072 C Adder 15.31 MW 13.02 MW
939191 AE1-149 C Adder 9.48 MW 8.06 MW
939261 AE1-157 C 80/20 13.32 MW 13.32 MW
940431 AE2-027 C Adder 11.6 MW 9.86 MW
940481 AE2-033 C Adder 13.14 MW 11.17 MW
940541 AE2-040 C Adder 2.33 MW 1.98 MW
940551 AE2-041 C Adder 6.24 MW 5.3 MW
940641 AE2-051 C Adder 13.72 MW 11.66 MW
941101 AE2-104 C Adder 2.92 MW 2.48 MW
943471 AF1-018 C Adder 6.24 MW 5.3 MW
944641 AF1-129 C Adder 92.56 MW 78.67 MW
315043 1FOUR RIVERA 80/20 2.95 MW 2.95 MW
315044 1FOUR RIVERB 80/20 2.95 MW 2.95 MW
315045 1FOUR RIVERC 80/20 3.61 MW 3.61 MW
315046 1FOUR RIVERD 80/20 2.91 MW 2.91 MW
315047 1FOUR RIVERE 80/20 2.91 MW 2.91 MW
315048 1FOUR RIVERF 80/20 3.55 MW 3.55 MW
315085 1SPRUNCC 80/20 0.15 MW 0.15 MW
315086 1SPRUNCD 80/20 0.15 MW 0.15 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 45.84 MW 45.84 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 25.97 MW 25.97 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 81.52 MW 81.52 MW
NY PJM->LTFIMP_NY CLTF 2.83 MW 2.83 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.82 MW 1.82 MW
WEC LTFEXP_WEC->PJM CLTF 0.94 MW 0.94 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.11 MW 9.11 MW
TVA LTFEXP_TVA->PJM CLTF 6.57 MW 6.57 MW
MEC LTFEXP_MEC->PJM CLTF 5.16 MW 5.16 MW
LAGN LTFEXP_LAGN->PJM CLTF 8.19 MW 8.19 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.34 MW 0.34 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.35 MW 4.35 MW

Details for 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
Contingency Name:
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 101.34 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3263.68 MVA
MW Contribution: 39.09 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.42 MW 0.35 MW
962331 AG1-082 C Adder 1.66 MW 1.41 MW
963041 AG1-153 C Adder 4.26 MW 3.62 MW
966811 AG1-552 C Adder 1.64 MW 1.4 MW
965291 AG1-394 C Adder 0.71 MW 0.6 MW
966621 AG1-532 C Adder 1.11 MW 0.95 MW
934521 AD1-076 C Adder 10.25 MW 8.71 MW
944011 AF1-069 C Adder 9.92 MW 8.43 MW
960081 AF2-299 C Adder 1.49 MW 1.26 MW
941031 AE2-094 C Adder 30.35 MW 25.8 MW
946281 AF1-292 C Adder 1.23 MW 1.04 MW
957481 AF2-042 C Adder 40.37 MW 34.31 MW
957521 AF2-046 C Adder 11.71 MW 9.95 MW
938771 AE1-103 C Adder 2.5 MW 2.12 MW
314229 6MT RD221 80/20 0.11 MW 0.11 MW
314236 6NRTHEST 80/20 0.17 MW 0.17 MW
314309 6IRON208 80/20 0.4 MW 0.4 MW
314507 3THOMPSN Adder 1.77 MW 1.5 MW
315039 1LDYSMT3 80/20 4.38 MW 4.38 MW
315040 1LDYSMT4 80/20 4.39 MW 4.39 MW
315041 1LDYSMT5 80/20 4.41 MW 4.41 MW
315060 1CHESTF5 80/20 57.63 MW 57.63 MW
315061 1CHESTG7 80/20 3.5 MW 3.5 MW
315062 1CHESTS7 80/20 1.61 MW 1.61 MW
315063 1CHESTG8 80/20 3.45 MW 3.45 MW
315064 1CHESTS8 80/20 1.77 MW 1.77 MW
315065 1CHESTF6 Adder 17.69 MW 15.03 MW
315067 1DARBY 1 80/20 2.34 MW 2.34 MW
315068 1DARBY 2 80/20 2.35 MW 2.35 MW
315069 1DARBY 3 80/20 2.35 MW 2.35 MW
315070 1DARBY 4 80/20 2.36 MW 2.36 MW
315073 1STONECA Adder 6.23 MW 5.29 MW
315083 1SPRUNCA Adder 8.2 MW 6.97 MW
315084 1SPRUNCB Adder 8.2 MW 6.97 MW
315092 1YORKTN3 Adder 118.27 MW 100.53 MW
936591 AD2-074 C Adder 4.67 MW 3.97 MW
942341 AE2-247 C Adder 1.3 MW 1.11 MW
943461 AF1-017 C Adder 1.18 MW 1.0 MW
943741 AF1-042 C Adder 2.44 MW 2.08 MW
961951 AG1-038 C Adder 2.7 MW 2.29 MW
966661 AG1-536 C Adder 4.47 MW 3.8 MW
966871 AG1-558 C 80/20 2.19 MW 2.19 MW
966881 AG1-559 C 80/20 2.27 MW 2.27 MW
315225 1N ANNA1 80/20 26.19 MW 26.19 MW
315226 1N ANNA2 80/20 26.2 MW 26.2 MW
315260 1GOSPORTA Adder 1.87 MW 1.59 MW
315261 1GOSPORTB Adder 2.38 MW 2.03 MW
315262 1GOSPORTC Adder 2.02 MW 1.72 MW
316075 AC2-137 C 80/20 0.34 MW 0.34 MW
957411 AF2-035 C 80/20 8.21 MW 8.21 MW
957601 AF2-054 C Adder 1.83 MW 1.55 MW
962861 AG1-135 C Adder 5.06 MW 4.3 MW
962971 AG1-146 C Adder 2.6 MW 2.21 MW
962981 AG1-147 C Adder 6.08 MW 5.17 MW
963051 AG1-154 C 80/20 3.37 MW 3.37 MW
964211 AG1-282 C Adder 1.65 MW 1.4 MW
942001 AE2-212 C Adder 1.92 MW 1.63 MW
957871 AF2-081 C Adder 8.69 MW 7.39 MW
958161 AF2-110 C Adder 1.19 MW 1.01 MW
926071 AC1-086 C Adder 16.8 MW 14.28 MW
933291 AC2-141 C Adder 26.71 MW 22.7 MW
939411 AE1-173 C Adder 73.52 MW 62.49 MW
927041 AC1-191 C 80/20 8.78 MW 8.78 MW
933981 AD1-022 C Adder 7.31 MW 6.21 MW
961681 AG1-008 C Adder 11.71 MW 9.95 MW
962571 AG1-106 C Adder 2.17 MW 1.85 MW
316004 AC1-112 C 80/20 0.3 MW 0.3 MW
316169 AC1-164 GEN 80/20 36.66 MW 36.66 MW
316233 AE1-074 C Adder 2.15 MW 1.83 MW
316240 AF1-291 C Adder 1.94 MW 1.65 MW
316312 AB1-027 C 80/20 0.49 MW 0.49 MW
316336 AC2-165 C Adder 7.76 MW 6.59 MW
315037 1LDYSMT1 80/20 4.21 MW 4.21 MW
315038 1LDYSMT2 80/20 4.27 MW 4.27 MW
315051 AA1-145 CT1 80/20 4.68 MW 4.68 MW
315052 AA1-145 CT2 80/20 4.67 MW 4.67 MW
316311 AC2-079 C Adder 5.0 MW 4.25 MW
316349 AD2-085 C Adder 3.0 MW 2.55 MW
961611 AG1-000B C Adder 14.19 MW 12.06 MW
941591 AE2-156 C Adder 15.69 MW 13.34 MW
944581 AF1-123 C Adder 39.7 MW 33.75 MW
944591 AF1-124 C Adder 39.85 MW 33.87 MW
944601 AF1-125 C Adder 39.09 MW 33.23 MW
944631 AF1-128 C 80/20 36.06 MW 36.06 MW
958261 AF2-120 C Adder 5.2 MW 4.42 MW
965281 AG1-393 C Adder 1.92 MW 1.63 MW
313764 3SOCKMAN Adder 0.57 MW 0.48 MW
934501 AD1-074 C Adder 28.22 MW 23.99 MW
934511 AD1-075 C Adder 7.06 MW 6.0 MW
935161 AD1-151 C Adder 14.47 MW 12.3 MW
938531 AE1-072 C Adder 15.27 MW 12.98 MW
939191 AE1-149 C Adder 9.45 MW 8.04 MW
939261 AE1-157 C 80/20 13.23 MW 13.23 MW
940431 AE2-027 C Adder 11.56 MW 9.83 MW
940481 AE2-033 C Adder 13.11 MW 11.14 MW
940541 AE2-040 C Adder 2.33 MW 1.98 MW
940551 AE2-041 C Adder 6.21 MW 5.28 MW
940641 AE2-051 C Adder 13.69 MW 11.64 MW
941101 AE2-104 C Adder 2.91 MW 2.48 MW
943471 AF1-018 C Adder 6.21 MW 5.28 MW
944641 AF1-129 C Adder 92.24 MW 78.41 MW
315043 1FOUR RIVERA 80/20 2.94 MW 2.94 MW
315044 1FOUR RIVERB 80/20 2.94 MW 2.94 MW
315045 1FOUR RIVERC 80/20 3.59 MW 3.59 MW
315046 1FOUR RIVERD 80/20 2.89 MW 2.89 MW
315047 1FOUR RIVERE 80/20 2.89 MW 2.89 MW
315048 1FOUR RIVERF 80/20 3.53 MW 3.53 MW
315085 1SPRUNCC 80/20 0.15 MW 0.15 MW
315086 1SPRUNCD 80/20 0.15 MW 0.15 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 45.83 MW 45.83 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 25.95 MW 25.95 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 81.42 MW 81.42 MW
NY PJM->LTFIMP_NY CLTF 2.83 MW 2.83 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.82 MW 1.82 MW
WEC LTFEXP_WEC->PJM CLTF 0.94 MW 0.94 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.1 MW 9.1 MW
TVA LTFEXP_TVA->PJM CLTF 6.57 MW 6.57 MW
MEC LTFEXP_MEC->PJM CLTF 5.16 MW 5.16 MW
LAGN LTFEXP_LAGN->PJM CLTF 8.18 MW 8.18 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.34 MW 0.34 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.34 MW 4.34 MW

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 100.88 %
Rating: 4070.2 MVA
Rating Type: B
MVA to Mitigate: 4105.97 MVA
MW Contribution: 68.23 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.23 MW 1.04 MW
961941 AG1-037 C Adder 0.7 MW 0.59 MW
962331 AG1-082 C Adder 2.79 MW 2.37 MW
963041 AG1-153 C Adder 7.02 MW 5.97 MW
966801 AG1-551 C Adder 2.86 MW 2.43 MW
966811 AG1-552 C Adder 2.71 MW 2.3 MW
965291 AG1-394 C Adder 1.19 MW 1.01 MW
966621 AG1-532 C Adder 1.82 MW 1.54 MW
934521 AD1-076 C Adder 17.45 MW 14.83 MW
944011 AF1-069 C Adder 16.4 MW 13.94 MW
960081 AF2-299 C Adder 2.42 MW 2.06 MW
941031 AE2-094 C Adder 50.2 MW 42.67 MW
946281 AF1-292 C Adder 2.01 MW 1.71 MW
957481 AF2-042 C Adder 64.72 MW 55.02 MW
957521 AF2-046 C Adder 19.67 MW 16.72 MW
957861 AF2-080 C Adder 10.13 MW 8.61 MW
938771 AE1-103 C Adder 4.25 MW 3.61 MW
314229 6MT RD221 80/20 0.18 MW 0.18 MW
314421 6WINCHST 80/20 0.2 MW 0.2 MW
314507 3THOMPSN 80/20 3.07 MW 3.07 MW
315060 1CHESTF5 Adder 92.3 MW 78.45 MW
315065 1CHESTF6 Adder 27.54 MW 23.41 MW
315073 1STONECA Adder 9.99 MW 8.49 MW
315083 1SPRUNCA Adder 10.61 MW 9.02 MW
315084 1SPRUNCB Adder 10.61 MW 9.02 MW
315092 1YORKTN3 80/20 206.84 MW 206.84 MW
936591 AD2-074 C Adder 7.4 MW 6.29 MW
942341 AE2-247 C Adder 2.2 MW 1.87 MW
943461 AF1-017 C Adder 1.99 MW 1.69 MW
943741 AF1-042 C Adder 3.87 MW 3.29 MW
961951 AG1-038 C Adder 4.28 MW 3.64 MW
966661 AG1-536 C Adder 6.97 MW 5.92 MW
966871 AG1-558 C Adder 3.38 MW 2.88 MW
315098 1CHESPKA 80/20 0.66 MW 0.66 MW
315099 1CHESPKB 80/20 1.1 MW 1.1 MW
315108 1ELIZAR1 80/20 4.86 MW 4.86 MW
315109 1ELIZAR2 80/20 4.77 MW 4.77 MW
315110 1ELIZAR3 80/20 4.92 MW 4.92 MW
315116 1SURRY 1 80/20 36.99 MW 36.99 MW
315120 1GRAVEL4 80/20 3.81 MW 3.81 MW
315122 1GRAVEL6 80/20 3.8 MW 3.8 MW
315216 1CUNINGA 80/20 7.92 MW 7.92 MW
315217 1CUNINGB 80/20 7.92 MW 7.92 MW
315218 1CUNINGC 80/20 7.92 MW 7.92 MW
315219 1CUNINGD 80/20 17.71 MW 17.71 MW
315233 1SURRY 2 80/20 40.27 MW 40.27 MW
315260 1GOSPORTA 80/20 3.24 MW 3.24 MW
315261 1GOSPORTB 80/20 4.14 MW 4.14 MW
315262 1GOSPORTC 80/20 3.51 MW 3.51 MW
316075 AC2-137 C 80/20 0.57 MW 0.57 MW
957601 AF2-054 C Adder 3.04 MW 2.58 MW
962861 AG1-135 C Adder 7.91 MW 6.72 MW
962971 AG1-146 C Adder 4.16 MW 3.54 MW
962981 AG1-147 C Adder 9.72 MW 8.26 MW
963611 AG1-210 C Adder 0.81 MW 0.69 MW
964211 AG1-282 C Adder 2.53 MW 2.15 MW
942001 AE2-212 C Adder 3.02 MW 2.56 MW
957871 AF2-081 C 80/20 15.09 MW 15.09 MW
958161 AF2-110 C Adder 2.04 MW 1.73 MW
926071 AC1-086 C Adder 27.76 MW 23.6 MW
927021 AC1-189 C Adder 11.15 MW 9.48 MW
933291 AC2-141 C 80/20 47.33 MW 47.33 MW
934621 AD1-088 C Adder 14.9 MW 12.66 MW
939411 AE1-173 C Adder 124.69 MW 105.99 MW
916191 Z1-068 C 80/20 0.07 MW 0.07 MW
927041 AC1-191 C Adder 13.59 MW 11.55 MW
933981 AD1-022 C Adder 12.42 MW 10.55 MW
961681 AG1-008 C Adder 19.67 MW 16.72 MW
962571 AG1-106 C Adder 3.59 MW 3.05 MW
316004 AC1-112 C 80/20 0.51 MW 0.51 MW
316036 AC1-147 C 80/20 0.56 MW 0.56 MW
316159 AE1-175 C 80/20 0.61 MW 0.61 MW
316169 AC1-164 GEN 80/20 63.01 MW 63.01 MW
316185 AD1-033 C 80/20 1.86 MW 1.86 MW
316236 AE1-162 C 80/20 0.53 MW 0.53 MW
316240 AF1-291 C Adder 3.03 MW 2.57 MW
316274 AC1-208 C Adder 11.87 MW 10.09 MW
316294 AC1-161 C 80/20 7.71 MW 7.71 MW
316312 AB1-027 C 80/20 0.81 MW 0.81 MW
316316 AC1-027 C 80/20 0.48 MW 0.48 MW
316382 AG1-145 C 80/20 0.55 MW 0.55 MW
316017 AA1-139 ULT1 80/20 1.63 MW 1.63 MW
316018 AA1-139 ULT2 80/20 1.63 MW 1.63 MW
316375 AC2-012 C 80/20 2.05 MW 2.05 MW
316311 AC2-079 C Adder 8.47 MW 7.2 MW
316349 AD2-085 C Adder 5.08 MW 4.31 MW
316388 AE2-253 GEN 80/20 2.96 MW 2.96 MW
961611 AG1-000B C Adder 23.85 MW 20.27 MW
941591 AE2-156 C 80/20 27.26 MW 27.26 MW
944581 AF1-123 C 80/20 69.3 MW 69.3 MW
944591 AF1-124 C 80/20 69.54 MW 69.54 MW
944601 AF1-125 C 80/20 68.23 MW 68.23 MW
944631 AF1-128 C Adder 57.75 MW 49.09 MW
958261 AF2-120 C Adder 8.1 MW 6.88 MW
962491 AG1-098 C Adder 13.31 MW 11.31 MW
965281 AG1-393 C Adder 3.03 MW 2.58 MW
313764 3SOCKMAN Adder 0.93 MW 0.79 MW
934321 AD1-056 C Adder 8.15 MW 6.93 MW
934331 AD1-057 C Adder 4.55 MW 3.87 MW
934501 AD1-074 C Adder 48.04 MW 40.83 MW
934511 AD1-075 C Adder 12.01 MW 10.21 MW
935161 AD1-151 C Adder 23.76 MW 20.19 MW
938531 AE1-072 C Adder 26.5 MW 22.53 MW
939191 AE1-149 C Adder 15.33 MW 13.03 MW
940431 AE2-027 C Adder 18.18 MW 15.46 MW
940481 AE2-033 C Adder 21.38 MW 18.17 MW
940541 AE2-040 C Adder 3.79 MW 3.23 MW
940551 AE2-041 C Adder 10.37 MW 8.81 MW
940641 AE2-051 C Adder 23.01 MW 19.56 MW
941101 AE2-104 C Adder 5.0 MW 4.25 MW
943471 AF1-018 C Adder 10.37 MW 8.81 MW
944641 AF1-129 C Adder 143.62 MW 122.08 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 74.17 MW 74.17 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 42.32 MW 42.32 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 133.89 MW 133.89 MW
NY PJM->LTFIMP_NY CLTF 3.6 MW 3.6 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.95 MW 2.95 MW
WEC LTFEXP_WEC->PJM CLTF 1.52 MW 1.52 MW
CPLE LTFEXP_CPLE->PJM CLTF 14.97 MW 14.97 MW
TVA LTFEXP_TVA->PJM CLTF 10.75 MW 10.75 MW
MEC LTFEXP_MEC->PJM CLTF 8.37 MW 8.37 MW
LAGN LTFEXP_LAGN->PJM CLTF 13.39 MW 13.39 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.54 MW 0.54 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.15 MW 7.15 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o DVP_P4-2: H2T574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Contingency Name:
DVP_P4-2: H2T574_SRT-S
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 117.91 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4645.73 MVA
MW Contribution: 225.91 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 8.84 MW 8.84 MW
963042 AG1-153 E 50/50 13.26 MW 13.26 MW
965291 AG1-394 C Adder 1.28 MW 1.09 MW
965292 AG1-394 E Adder 2.35 MW 2.0 MW
966621 AG1-532 C Adder 2.08 MW 1.77 MW
966622 AG1-532 E Adder 1.39 MW 1.18 MW
314541 3WATKINS Adder 1.04 MW 0.89 MW
314572 3EMPORIA Adder 0.64 MW 0.54 MW
920042 AA2-088 E OP Adder 15.9 MW 13.51 MW
934521 AD1-076 C Adder 18.36 MW 15.61 MW
934522 AD1-076 E Adder 9.36 MW 7.96 MW
944011 AF1-069 C 50/50 20.78 MW 20.78 MW
944012 AF1-069 E 50/50 8.07 MW 8.07 MW
960081 AF2-299 C Adder 2.78 MW 2.36 MW
960082 AF2-299 E Adder 1.85 MW 1.57 MW
900672 V4-068 E Adder 0.53 MW 0.45 MW
923573 AB1-173 E OP Adder 4.86 MW 4.13 MW
940492 AE2-034 E Adder 4.64 MW 3.95 MW
941031 AE2-094 C 50/50 63.59 MW 63.59 MW
941032 AE2-094 E 50/50 28.48 MW 28.48 MW
946281 AF1-292 C Adder 2.3 MW 1.95 MW
946282 AF1-292 E Adder 1.53 MW 1.3 MW
957481 AF2-042 C Adder 80.97 MW 68.83 MW
957482 AF2-042 E Adder 53.98 MW 45.89 MW
957521 AF2-046 C Adder 21.2 MW 18.02 MW
957522 AF2-046 E Adder 10.71 MW 9.11 MW
314539 3UNCAMP Adder 9.18 MW 7.81 MW
916042 Z1-036 E Adder 43.27 MW 36.78 MW
938771 AE1-103 C Adder 4.43 MW 3.77 MW
938772 AE1-103 E Adder 6.12 MW 5.2 MW
314331 6POE 50/50 2.08 MW 2.08 MW
314507 3THOMPSN Adder 3.08 MW 2.62 MW
314525 6KINGFORK Adder 1.53 MW 1.3 MW
314550 6HICKORY 50/50 3.33 MW 3.33 MW
315065 1CHESTF6 Adder 28.13 MW 23.91 MW
315073 1STONECA Adder 9.74 MW 8.28 MW
315083 1SPRUNCA Adder 13.37 MW 11.37 MW
315084 1SPRUNCB Adder 13.37 MW 11.37 MW
315092 1YORKTN3 Adder 138.57 MW 117.78 MW
926662 AC1-147 E Adder 2.02 MW 1.72 MW
926755 AC1-161 E 50/50 19.89 MW 19.89 MW
927226 AC1-216 E Adder 11.13 MW 9.46 MW
935112 AD1-144 E Adder 1.42 MW 1.21 MW
942341 AE2-247 C Adder 2.26 MW 1.93 MW
942342 AE2-247 E Adder 3.13 MW 2.66 MW
943461 AF1-017 C Adder 2.05 MW 1.74 MW
943462 AF1-017 E Adder 3.34 MW 2.84 MW
943612 AF1-032 E Adder 1.41 MW 1.2 MW
958502 AF2-144 E Adder 1.8 MW 1.53 MW
315102 1BRUNSWICKG1 50/50 13.0 MW 13.0 MW
315103 1BRUNSWICKG2 50/50 13.0 MW 13.0 MW
315104 1BRUNSWICKG3 50/50 13.0 MW 13.0 MW
315105 1BRUNSWICKS1 50/50 27.02 MW 27.02 MW
315108 1ELIZAR1 50/50 4.88 MW 4.88 MW
315109 1ELIZAR2 50/50 4.79 MW 4.79 MW
315110 1ELIZAR3 50/50 4.94 MW 4.94 MW
315241 1Z1-086 GT1 50/50 16.66 MW 16.66 MW
315242 1Z1-086 GT2 50/50 16.65 MW 16.65 MW
315243 1Z1-086 GT3 50/50 16.65 MW 16.65 MW
315244 1Z1-086 ST 50/50 28.99 MW 28.99 MW
315260 1GOSPORTA Adder 3.25 MW 2.76 MW
315261 1GOSPORTB Adder 4.15 MW 3.53 MW
315262 1GOSPORTC Adder 3.53 MW 3.0 MW
913392 Y1-086 E Adder 3.35 MW 2.84 MW
916192 Z1-068 E 50/50 2.87 MW 2.87 MW
923832 AB2-022 E Adder 1.89 MW 1.6 MW
923852 AB2-025 E 50/50 1.78 MW 1.78 MW
923862 AB2-026 E Adder 1.84 MW 1.56 MW
938552 AE1-074 E 50/50 2.0 MW 2.0 MW
938562 AE1-075 E Adder 1.56 MW 1.33 MW
939312 AE1-162 E Adder 2.13 MW 1.81 MW
946262 AF1-291 E Adder 2.08 MW 1.77 MW
957492 AF2-043 E Adder 2.17 MW 1.84 MW
901082 W1-029 E Adder 48.45 MW 41.18 MW
917122 Z2-027 E Adder 2.04 MW 1.74 MW
925332 AB2-190 E Adder 11.54 MW 9.81 MW
925522 AC1-027 E 50/50 1.86 MW 1.86 MW
942001 AE2-212 C Adder 3.2 MW 2.72 MW
942002 AE2-212 E Adder 2.13 MW 1.81 MW
957871 AF2-081 C Adder 15.25 MW 12.96 MW
957872 AF2-081 E Adder 6.53 MW 5.55 MW
958161 AF2-110 C Adder 2.08 MW 1.77 MW
958162 AF2-110 E Adder 3.31 MW 2.81 MW
933291 AC2-141 C 50/50 46.6 MW 46.6 MW
933292 AC2-141 E 50/50 19.89 MW 19.89 MW
934621 AD1-088 C Adder 18.68 MW 15.88 MW
934622 AD1-088 E Adder 8.79 MW 7.47 MW
939411 AE1-173 C 50/50 144.7 MW 144.7 MW
939412 AE1-173 E 50/50 96.46 MW 96.46 MW
934012 AD1-025 E Adder 14.41 MW 12.25 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
933981 AD1-022 C Adder 13.13 MW 11.16 MW
933982 AD1-022 E Adder 7.15 MW 6.07 MW
961681 AG1-008 C Adder 21.2 MW 18.02 MW
961682 AG1-008 E Adder 10.71 MW 9.11 MW
314594 6PLYMOUTH TP Adder 0.48 MW 0.41 MW
314632 6AYDLETT TAP Adder 2.07 MW 1.76 MW
316185 AD1-033 C 50/50 1.87 MW 1.87 MW
316233 AE1-074 C 50/50 3.96 MW 3.96 MW
316240 AF1-291 C Adder 3.12 MW 2.65 MW
316294 AC1-161 C 50/50 7.59 MW 7.59 MW
316315 AB2-025 C 50/50 0.62 MW 0.62 MW
316316 AC1-027 C 50/50 0.48 MW 0.48 MW
924516 AB2-100 E1 Adder 4.35 MW 3.69 MW
924517 AB2-100 E2 Adder 4.35 MW 3.69 MW
934065 AD1-033 E 50/50 7.67 MW 7.67 MW
937226 AE2-253 E Adder 8.92 MW 7.58 MW
919153 AA1-139 E2 Adder 6.23 MW 5.3 MW
919152 AA1-139 E1 Adder 6.23 MW 5.3 MW
920692 AA2-178 E Adder 6.19 MW 5.26 MW
923994 AB2-040_E Adder 9.12 MW 7.75 MW
924814 AB2-134 E Adder 18.24 MW 15.5 MW
316084 AB2-161 E Adder 8.35 MW 7.1 MW
316088 AB2-174 E Adder 9.67 MW 8.22 MW
316375 AC2-012 C 50/50 2.06 MW 2.06 MW
932046 AC2-012 E 50/50 20.01 MW 20.01 MW
316311 AC2-079 C Adder 8.71 MW 7.4 MW
932596 AC2-079 E Adder 14.21 MW 12.08 MW
934576 AD1-082 E Adder 6.65 MW 5.66 MW
316349 AD2-085 C Adder 5.22 MW 4.44 MW
936666 AD2-085 E Adder 8.52 MW 7.25 MW
961611 AG1-000B C Adder 23.24 MW 19.75 MW
941591 AE2-156 C 50/50 27.35 MW 27.35 MW
944581 AF1-123 C 50/50 69.75 MW 69.75 MW
944582 AF1-123 E 50/50 159.73 MW 159.73 MW
944591 AF1-124 C 50/50 70.0 MW 70.0 MW
944592 AF1-124 E 50/50 160.31 MW 160.31 MW
944601 AF1-125 C 50/50 68.68 MW 68.68 MW
944602 AF1-125 E 50/50 157.22 MW 157.22 MW
962491 AG1-098 C Adder 16.7 MW 14.2 MW
962492 AG1-098 E Adder 11.14 MW 9.47 MW
965281 AG1-393 C Adder 3.14 MW 2.67 MW
965282 AG1-393 E Adder 2.09 MW 1.78 MW
934501 AD1-074 C Adder 50.56 MW 42.98 MW
934502 AD1-074 E Adder 25.74 MW 21.88 MW
934511 AD1-075 C Adder 12.64 MW 10.74 MW
934512 AD1-075 E Adder 6.44 MW 5.47 MW
934612 AD1-087 E Adder 5.33 MW 4.53 MW
935161 AD1-151 C Adder 23.16 MW 19.68 MW
935162 AD1-151 E Adder 15.44 MW 13.12 MW
937482 AD2-202 E Adder 1.56 MW 1.33 MW
938531 AE1-072 C Adder 26.8 MW 22.78 MW
938532 AE1-072 E Adder 13.97 MW 11.88 MW
939191 AE1-149 C Adder 16.16 MW 13.73 MW
939192 AE1-149 E Adder 10.77 MW 9.15 MW
940431 AE2-027 C Adder 18.69 MW 15.89 MW
940432 AE2-027 E Adder 12.46 MW 10.59 MW
940481 AE2-033 C 50/50 24.74 MW 24.74 MW
940482 AE2-033 E 50/50 16.68 MW 16.68 MW
940541 AE2-040 C 50/50 4.4 MW 4.4 MW
940641 AE2-051 C 50/50 27.95 MW 27.95 MW
940642 AE2-051 E 50/50 18.64 MW 18.64 MW
941101 AE2-104 C Adder 5.1 MW 4.34 MW
941102 AE2-104 E Adder 8.11 MW 6.9 MW
944641 AF1-129 C Adder 146.7 MW 124.69 MW
316303 AF2-085 50/50 6.54 MW 6.54 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 65.41 MW 65.41 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 40.48 MW 40.48 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 145.6 MW 145.6 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 7.11 MW 7.11 MW
NY PJM->LTFIMP_NY CLTF 3.23 MW 3.23 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.61 MW 2.61 MW
WEC LTFEXP_WEC->PJM CLTF 1.34 MW 1.34 MW
CPLE LTFEXP_CPLE->PJM CLTF 16.85 MW 16.85 MW
TVA LTFEXP_TVA->PJM CLTF 10.54 MW 10.54 MW
MEC LTFEXP_MEC->PJM CLTF 7.66 MW 7.66 MW
LAGN LTFEXP_LAGN->PJM CLTF 13.22 MW 13.22 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.49 MW 0.49 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 45.23 MW 45.23 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.04 MW 8.04 MW

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P4-2: 568T575_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
Contingency Name:
DVP_P4-2: 568T575_SRT-A
CONTINGENCY 'DVP_P4-2: 568T575_SRT-A'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 117.71 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4637.69 MVA
MW Contribution: 137.3 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C Adder 1.66 MW 1.41 MW
961792 AG1-021 E Adder 1.41 MW 1.2 MW
961941 AG1-037 C Adder 0.47 MW 0.4 MW
961942 AG1-037 E Adder 0.31 MW 0.27 MW
962331 AG1-082 C Adder 1.87 MW 1.59 MW
962332 AG1-082 E Adder 1.25 MW 1.06 MW
963041 AG1-153 C Adder 5.78 MW 4.91 MW
963042 AG1-153 E Adder 8.67 MW 7.37 MW
963171 AG1-166 C Adder 0.92 MW 0.78 MW
963172 AG1-166 E Adder 2.15 MW 1.83 MW
963181 AG1-167 C Adder 0.69 MW 0.59 MW
963182 AG1-167 E Adder 1.61 MW 1.37 MW
963191 AG1-168 C Adder 0.69 MW 0.59 MW
963192 AG1-168 E Adder 1.61 MW 1.37 MW
966811 AG1-552 C Adder 1.92 MW 1.63 MW
966812 AG1-552 E Adder 0.91 MW 0.77 MW
965291 AG1-394 C Adder 0.8 MW 0.68 MW
965292 AG1-394 E Adder 1.46 MW 1.24 MW
966621 AG1-532 C Adder 1.32 MW 1.12 MW
966622 AG1-532 E Adder 0.88 MW 0.75 MW
313853 3PONTONDP Adder 0.62 MW 0.52 MW
314541 3WATKINS Adder 0.64 MW 0.55 MW
314572 3EMPORIA Adder 0.41 MW 0.34 MW
314713 3PAMPLIN Adder 0.92 MW 0.78 MW
918492 AA1-063AE OP Adder 3.8 MW 3.23 MW
919692 AA2-053 E OP Adder 3.93 MW 3.34 MW
920042 AA2-088 E OP Adder 9.87 MW 8.39 MW
925785 AC1-054 E Adder 3.19 MW 2.71 MW
934521 AD1-076 C Adder 11.32 MW 9.62 MW
934522 AD1-076 E Adder 5.77 MW 4.9 MW
943172 AE2-346 E Adder 0.56 MW 0.48 MW
944011 AF1-069 C 50/50 13.61 MW 13.61 MW
944012 AF1-069 E 50/50 5.29 MW 5.29 MW
959311 AF2-222 C Adder 15.42 MW 13.11 MW
959312 AF2-222 E Adder 10.33 MW 8.78 MW
960081 AF2-299 C Adder 1.76 MW 1.5 MW
960082 AF2-299 E Adder 1.18 MW 1.0 MW
316141 AB2-099 E Adder 0.23 MW 0.2 MW
900672 V4-068 E Adder 0.33 MW 0.28 MW
923263 AB1-132 E OP Adder 5.7 MW 4.84 MW
923573 AB1-173 E OP Adder 3.08 MW 2.62 MW
924162 AB2-060 E OP Adder 3.96 MW 3.37 MW
924302 AB2-077 E O1 Adder 1.24 MW 1.05 MW
924312 AB2-078 E O1 Adder 1.24 MW 1.05 MW
924322 AB2-079 E O1 Adder 1.24 MW 1.05 MW
925612 AC1-036 E Adder 0.79 MW 0.68 MW
938371 AE1-056 C Adder 5.96 MW 5.07 MW
938372 AE1-056 E Adder 3.26 MW 2.77 MW
939181 AE1-148 C Adder 8.34 MW 7.09 MW
939182 AE1-148 E Adder 5.56 MW 4.73 MW
940492 AE2-034 E Adder 2.85 MW 2.43 MW
941031 AE2-094 C 50/50 41.64 MW 41.64 MW
941032 AE2-094 E 50/50 18.65 MW 18.65 MW
946281 AF1-292 C Adder 1.46 MW 1.24 MW
946282 AF1-292 E Adder 0.97 MW 0.83 MW
946301 AF1-294 C Adder 3.41 MW 2.9 MW
946302 AF1-294 E Adder 2.89 MW 2.46 MW
957481 AF2-042 C Adder 53.37 MW 45.36 MW
957482 AF2-042 E Adder 35.58 MW 30.24 MW
957521 AF2-046 C Adder 13.18 MW 11.2 MW
957522 AF2-046 E Adder 6.66 MW 5.66 MW
958211 AF2-115 C Adder 2.08 MW 1.76 MW
958212 AF2-115 E Adder 1.77 MW 1.5 MW
314539 3UNCAMP Adder 5.66 MW 4.81 MW
916042 Z1-036 E Adder 26.48 MW 22.51 MW
938771 AE1-103 C Adder 2.72 MW 2.31 MW
938772 AE1-103 E Adder 3.76 MW 3.2 MW
933502 AC2-165 E Adder 7.59 MW 6.45 MW
314331 6POE Adder 1.29 MW 1.09 MW
314507 3THOMPSN Adder 1.87 MW 1.59 MW
314525 6KINGFORK Adder 0.92 MW 0.79 MW
314550 6HICKORY Adder 2.02 MW 1.72 MW
315065 1CHESTF6 Adder 16.78 MW 14.27 MW
315083 1SPRUNCA Adder 8.15 MW 6.93 MW
315084 1SPRUNCB Adder 8.15 MW 6.93 MW
926662 AC1-147 E Adder 1.23 MW 1.04 MW
926755 AC1-161 E Adder 12.01 MW 10.21 MW
935112 AD1-144 E Adder 0.86 MW 0.73 MW
942341 AE2-247 C Adder 1.38 MW 1.17 MW
942342 AE2-247 E Adder 1.91 MW 1.62 MW
943461 AF1-017 C Adder 1.25 MW 1.06 MW
943462 AF1-017 E Adder 2.04 MW 1.73 MW
943612 AF1-032 E Adder 0.86 MW 0.73 MW
958502 AF2-144 E Adder 1.26 MW 1.07 MW
315172 1LOISA A 50/50 2.73 MW 2.73 MW
315173 1LOISA B 50/50 2.75 MW 2.75 MW
315174 1LOISA C 50/50 2.75 MW 2.75 MW
315175 1LOISA D 50/50 2.75 MW 2.75 MW
315176 1LOISA E 50/50 5.6 MW 5.6 MW
315177 1S ANNAG1 50/50 2.69 MW 2.69 MW
315178 1S ANNAS1 50/50 1.38 MW 1.38 MW
315179 1S ANNAG2 50/50 2.69 MW 2.69 MW
315180 1S ANNAS2 50/50 1.38 MW 1.38 MW
315225 1N ANNA1 50/50 89.58 MW 89.58 MW
315226 1N ANNA2 50/50 89.62 MW 89.62 MW
315260 1GOSPORTA Adder 1.97 MW 1.68 MW
315261 1GOSPORTB Adder 2.52 MW 2.14 MW
315262 1GOSPORTC Adder 2.14 MW 1.82 MW
913392 Y1-086 E Adder 2.04 MW 1.73 MW
916192 Z1-068 E Adder 1.74 MW 1.48 MW
923832 AB2-022 E Adder 1.15 MW 0.98 MW
923852 AB2-025 E Adder 1.13 MW 0.96 MW
923862 AB2-026 E Adder 1.28 MW 1.09 MW
925022 AB2-158 E 50/50 9.72 MW 9.72 MW
938552 AE1-074 E Adder 1.28 MW 1.09 MW
938562 AE1-075 E Adder 1.09 MW 0.93 MW
939312 AE1-162 E Adder 1.28 MW 1.09 MW
946262 AF1-291 E Adder 1.25 MW 1.06 MW
957492 AF2-043 E Adder 1.32 MW 1.12 MW
966001 AG1-469 C 50/50 1.99 MW 1.99 MW
966002 AG1-469 E 50/50 0.99 MW 0.99 MW
901082 W1-029 E Adder 29.56 MW 25.12 MW
917122 Z2-027 E Adder 1.25 MW 1.06 MW
925522 AC1-027 E Adder 1.13 MW 0.96 MW
942001 AE2-212 C Adder 1.94 MW 1.65 MW
942002 AE2-212 E Adder 1.3 MW 1.1 MW
957871 AF2-081 C Adder 9.27 MW 7.88 MW
957872 AF2-081 E Adder 3.97 MW 3.38 MW
958161 AF2-110 C Adder 1.27 MW 1.08 MW
958162 AF2-110 E Adder 2.02 MW 1.72 MW
314722 3TWITTYS Adder 0.88 MW 0.75 MW
926071 AC1-086 C Adder 19.59 MW 16.65 MW
926072 AC1-086 E Adder 8.91 MW 7.58 MW
936261 AD2-033 C Adder 12.04 MW 10.23 MW
936262 AD2-033 E Adder 8.03 MW 6.82 MW
933291 AC2-141 C Adder 28.14 MW 23.92 MW
933292 AC2-141 E Adder 12.01 MW 10.21 MW
934621 AD1-088 C Adder 12.4 MW 10.54 MW
934622 AD1-088 E Adder 5.84 MW 4.96 MW
939411 AE1-173 C Adder 92.33 MW 78.48 MW
939412 AE1-173 E Adder 61.55 MW 52.32 MW
933981 AD1-022 C Adder 8.1 MW 6.88 MW
933982 AD1-022 E Adder 4.41 MW 3.75 MW
962572 AG1-106 E Adder 1.11 MW 0.94 MW
961681 AG1-008 C Adder 13.18 MW 11.2 MW
961682 AG1-008 E Adder 6.66 MW 5.66 MW
962571 AG1-106 C Adder 2.53 MW 2.15 MW
208900 BRIS G1 50/50 -2.84 MW -2.84 MW
208901 BRIS G2 50/50 -3.36 MW -3.36 MW
314594 6PLYMOUTH TP Adder 0.3 MW 0.25 MW
314632 6AYDLETT TAP Adder 1.26 MW 1.07 MW
316164 AC1-076_C 50/50 1.13 MW 1.13 MW
316170 AC1-121 C 50/50 2.77 MW 2.77 MW
316192 AB2-158 C 50/50 3.66 MW 3.66 MW
316233 AE1-074 C Adder 2.55 MW 2.17 MW
316240 AF1-291 C Adder 1.87 MW 1.59 MW
316254 AC1-120 C 50/50 8.06 MW 8.06 MW
316336 AC2-165 C Adder 10.08 MW 8.57 MW
917332 KELFORD E Adder 1.52 MW 1.29 MW
924516 AB2-100 E1 Adder 2.75 MW 2.33 MW
924517 AB2-100 E2 Adder 2.75 MW 2.33 MW
934065 AD1-033 E Adder 4.66 MW 3.96 MW
937226 AE2-253 E Adder 5.42 MW 4.61 MW
926004 AC1-076_E 50/50 6.48 MW 6.48 MW
926486 AC1-120 E 50/50 4.15 MW 4.15 MW
926502 AC1-121 E 50/50 1.3 MW 1.3 MW
918512 AA1-065 E OP Adder 5.11 MW 4.34 MW
919153 AA1-139 E2 Adder 3.79 MW 3.22 MW
919152 AA1-139 E1 Adder 3.79 MW 3.22 MW
920692 AA2-178 E Adder 3.8 MW 3.23 MW
923994 AB2-040_E Adder 5.77 MW 4.91 MW
924022 AB2-043 E O1 Adder 4.8 MW 4.08 MW
924814 AB2-134 E Adder 6.03 MW 5.12 MW
316084 AB2-161 E Adder 5.09 MW 4.33 MW
316088 AB2-174 E Adder 6.13 MW 5.21 MW
316044 AC1-158 C1 50/50 19.49 MW 19.49 MW
316045 AC1-158 C2 50/50 19.49 MW 19.49 MW
926739 AC1-158 E1 50/50 50.97 MW 50.97 MW
926740 AC1-158 E2 50/50 50.97 MW 50.97 MW
932046 AC2-012 E Adder 12.13 MW 10.31 MW
316311 AC2-079 C Adder 5.31 MW 4.51 MW
932596 AC2-079 E Adder 8.66 MW 7.36 MW
934576 AD1-082 E Adder 4.06 MW 3.45 MW
316349 AD2-085 C Adder 3.19 MW 2.71 MW
936666 AD2-085 E Adder 5.2 MW 4.42 MW
961611 AG1-000B C Adder 13.82 MW 11.75 MW
941591 AE2-156 C Adder 16.59 MW 14.1 MW
944581 AF1-123 C Adder 42.4 MW 36.04 MW
944582 AF1-123 E Adder 97.08 MW 82.52 MW
944591 AF1-124 C Adder 42.55 MW 36.16 MW
944592 AF1-124 E Adder 97.44 MW 82.82 MW
944601 AF1-125 C Adder 41.74 MW 35.48 MW
944602 AF1-125 E Adder 95.56 MW 81.23 MW
962491 AG1-098 C Adder 11.11 MW 9.45 MW
962492 AG1-098 E Adder 7.41 MW 6.3 MW
964241 AG1-285 C Adder 11.6 MW 9.86 MW
964242 AG1-285 E Adder 7.73 MW 6.57 MW
965281 AG1-393 C Adder 1.89 MW 1.61 MW
965282 AG1-393 E Adder 1.26 MW 1.07 MW
313764 3SOCKMAN Adder 0.67 MW 0.57 MW
934501 AD1-074 C Adder 31.16 MW 26.48 MW
934502 AD1-074 E Adder 15.86 MW 13.48 MW
934511 AD1-075 C Adder 7.79 MW 6.62 MW
934512 AD1-075 E Adder 3.96 MW 3.37 MW
934612 AD1-087 E Adder 3.51 MW 2.98 MW
935172 AD1-152 E Adder 5.19 MW 4.41 MW
937482 AD2-202 E Adder 1.03 MW 0.87 MW
938531 AE1-072 C Adder 16.3 MW 13.86 MW
938532 AE1-072 E Adder 8.5 MW 7.22 MW
939191 AE1-149 C Adder 9.86 MW 8.38 MW
939192 AE1-149 E Adder 6.57 MW 5.59 MW
940431 AE2-027 C Adder 11.21 MW 9.53 MW
940432 AE2-027 E Adder 7.48 MW 6.35 MW
940481 AE2-033 C Adder 15.68 MW 13.33 MW
940482 AE2-033 E Adder 10.57 MW 8.99 MW
940541 AE2-040 C Adder 2.79 MW 2.37 MW
940641 AE2-051 C 50/50 18.09 MW 18.09 MW
940642 AE2-051 E 50/50 12.06 MW 12.06 MW
941101 AE2-104 C Adder 3.11 MW 2.64 MW
941102 AE2-104 E Adder 4.95 MW 4.2 MW
942461 AE2-259 C Adder 9.19 MW 7.81 MW
942462 AE2-259 E Adder 6.13 MW 5.21 MW
944641 AF1-129 C Adder 87.53 MW 74.4 MW
316303 AF2-085 50/50 4.37 MW 4.37 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 25.18 MW 25.18 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 20.22 MW 20.22 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 88.44 MW 88.44 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.76 MW 5.76 MW
NY PJM->LTFIMP_NY CLTF 2.71 MW 2.71 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.1 MW 1.1 MW
WEC LTFEXP_WEC->PJM CLTF 0.54 MW 0.54 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.5 MW 10.5 MW
TVA LTFEXP_TVA->PJM CLTF 5.62 MW 5.62 MW
MEC LTFEXP_MEC->PJM CLTF 3.41 MW 3.41 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.07 MW 7.07 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.21 MW 0.21 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.71 MW 36.71 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.0 MW 5.0 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o DVP_P4-2: H2T574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Contingency Name:
DVP_P4-2: H2T574_SRT-S
CONTINGENCY 'DVP_P4-2: H2T574_SRT-S'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 2                /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314922 CKT 1 /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 115.67 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4557.54 MVA
MW Contribution: 202.0 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 1.25 MW 1.07 MW
961672 AG1-007 E Adder 0.71 MW 0.6 MW
961941 AG1-037 C Adder 0.68 MW 0.57 MW
961942 AG1-037 E Adder 0.45 MW 0.38 MW
962331 AG1-082 C Adder 2.71 MW 2.3 MW
962332 AG1-082 E Adder 1.8 MW 1.53 MW
963041 AG1-153 C 50/50 9.17 MW 9.17 MW
963042 AG1-153 E 50/50 13.76 MW 13.76 MW
964791 AG1-342 C Adder 4.45 MW 3.78 MW
964792 AG1-342 E Adder 2.97 MW 2.52 MW
966801 AG1-551 C Adder 2.82 MW 2.4 MW
966802 AG1-551 E Adder 1.48 MW 1.26 MW
966811 AG1-552 C Adder 2.75 MW 2.33 MW
966812 AG1-552 E Adder 1.31 MW 1.11 MW
965291 AG1-394 C Adder 1.14 MW 0.97 MW
965292 AG1-394 E Adder 2.1 MW 1.78 MW
966621 AG1-532 C Adder 1.87 MW 1.59 MW
966622 AG1-532 E Adder 1.25 MW 1.06 MW
314541 3WATKINS Adder 0.92 MW 0.78 MW
314572 3EMPORIA Adder 0.58 MW 0.49 MW
315131 1EDGECMA Adder 20.7 MW 17.59 MW
315153 1CLOVER1 50/50 18.02 MW 18.02 MW
315154 1CLOVER2 50/50 17.85 MW 17.85 MW
918492 AA1-063AE OP Adder 5.46 MW 4.64 MW
918532 AA1-067 E Adder 0.96 MW 0.81 MW
919692 AA2-053 E OP Adder 5.65 MW 4.8 MW
920042 AA2-088 E OP Adder 14.16 MW 12.04 MW
925785 AC1-054 E Adder 4.52 MW 3.84 MW
926274 AC1-105 E Adder 3.41 MW 2.9 MW
927146 AC1-208 E Adder 5.35 MW 4.55 MW
934521 AD1-076 C Adder 16.48 MW 14.0 MW
934522 AD1-076 E Adder 8.4 MW 7.14 MW
943172 AE2-346 E Adder 0.81 MW 0.69 MW
943902 AF1-058 E Adder 1.66 MW 1.41 MW
944011 AF1-069 C 50/50 21.79 MW 21.79 MW
944012 AF1-069 E 50/50 8.46 MW 8.46 MW
960061 AF2-297 C Adder 9.93 MW 8.44 MW
960062 AF2-297 E Adder 6.62 MW 5.63 MW
960081 AF2-299 C Adder 2.5 MW 2.12 MW
960082 AF2-299 E Adder 1.67 MW 1.42 MW
316141 AB2-099 E Adder 0.34 MW 0.29 MW
900672 V4-068 E Adder 0.48 MW 0.41 MW
917342 Z2-044 E Adder 0.8 MW 0.68 MW
922923 AB1-081 E OP Adder 4.97 MW 4.22 MW
923263 AB1-132 E OP Adder 8.22 MW 6.99 MW
923573 AB1-173 E OP Adder 4.39 MW 3.73 MW
924162 AB2-060 E OP Adder 5.21 MW 4.43 MW
924302 AB2-077 E O1 Adder 1.64 MW 1.4 MW
924312 AB2-078 E O1 Adder 1.64 MW 1.4 MW
924322 AB2-079 E O1 Adder 1.64 MW 1.4 MW
939181 AE1-148 C Adder 11.58 MW 9.84 MW
939182 AE1-148 E Adder 7.72 MW 6.56 MW
940492 AE2-034 E Adder 4.15 MW 3.53 MW
941031 AE2-094 C 50/50 66.68 MW 66.68 MW
941032 AE2-094 E 50/50 29.87 MW 29.87 MW
946281 AF1-292 C Adder 2.07 MW 1.76 MW
946282 AF1-292 E Adder 1.38 MW 1.17 MW
957481 AF2-042 C 50/50 79.02 MW 79.02 MW
957482 AF2-042 E 50/50 52.68 MW 52.68 MW
957521 AF2-046 C Adder 18.99 MW 16.14 MW
957522 AF2-046 E Adder 9.6 MW 8.16 MW
957861 AF2-080 C Adder 10.22 MW 8.69 MW
957862 AF2-080 E Adder 4.53 MW 3.85 MW
314539 3UNCAMP Adder 8.09 MW 6.88 MW
916042 Z1-036 E Adder 38.53 MW 32.75 MW
938771 AE1-103 C Adder 3.89 MW 3.31 MW
938772 AE1-103 E Adder 5.38 MW 4.57 MW
314331 6POE Adder 1.61 MW 1.37 MW
314507 3THOMPSN Adder 2.7 MW 2.3 MW
314525 6KINGFORK Adder 1.31 MW 1.11 MW
314550 6HICKORY 50/50 2.95 MW 2.95 MW
926662 AC1-147 E Adder 1.77 MW 1.51 MW
926755 AC1-161 E 50/50 18.01 MW 18.01 MW
935112 AD1-144 E Adder 1.21 MW 1.03 MW
942341 AE2-247 C Adder 1.89 MW 1.61 MW
942342 AE2-247 E Adder 2.62 MW 2.22 MW
943461 AF1-017 C Adder 1.71 MW 1.46 MW
943462 AF1-017 E Adder 2.8 MW 2.38 MW
943612 AF1-032 E Adder 1.24 MW 1.05 MW
315102 1BRUNSWICKG1 50/50 13.49 MW 13.49 MW
315103 1BRUNSWICKG2 50/50 13.49 MW 13.49 MW
315104 1BRUNSWICKG3 50/50 13.49 MW 13.49 MW
315105 1BRUNSWICKS1 50/50 28.03 MW 28.03 MW
315108 1ELIZAR1 50/50 4.29 MW 4.29 MW
315109 1ELIZAR2 50/50 4.21 MW 4.21 MW
315110 1ELIZAR3 50/50 4.34 MW 4.34 MW
315241 1Z1-086 GT1 50/50 17.34 MW 17.34 MW
315242 1Z1-086 GT2 50/50 17.34 MW 17.34 MW
315243 1Z1-086 GT3 50/50 17.34 MW 17.34 MW
315244 1Z1-086 ST 50/50 30.18 MW 30.18 MW
315260 1GOSPORTA Adder 2.85 MW 2.42 MW
315261 1GOSPORTB Adder 3.64 MW 3.1 MW
315262 1GOSPORTC Adder 3.09 MW 2.63 MW
913392 Y1-086 E Adder 2.97 MW 2.52 MW
916192 Z1-068 E 50/50 2.53 MW 2.53 MW
923832 AB2-022 E Adder 1.68 MW 1.42 MW
923852 AB2-025 E 50/50 1.6 MW 1.6 MW
939312 AE1-162 E Adder 1.72 MW 1.46 MW
957492 AF2-043 E Adder 1.91 MW 1.62 MW
901082 W1-029 E Adder 42.96 MW 36.51 MW
917122 Z2-027 E Adder 1.81 MW 1.54 MW
925522 AC1-027 E 50/50 1.64 MW 1.64 MW
957871 AF2-081 C 50/50 13.52 MW 13.52 MW
957872 AF2-081 E 50/50 5.79 MW 5.79 MW
958161 AF2-110 C Adder 1.81 MW 1.54 MW
958162 AF2-110 E Adder 2.88 MW 2.45 MW
917512 Z2-088 E OP1 Adder 6.55 MW 5.57 MW
926071 AC1-086 C Adder 28.24 MW 24.0 MW
926072 AC1-086 E Adder 12.85 MW 10.92 MW
927021 AC1-189 C Adder 11.26 MW 9.57 MW
927022 AC1-189 E Adder 5.61 MW 4.77 MW
933291 AC2-141 C 50/50 42.18 MW 42.18 MW
933292 AC2-141 E 50/50 18.01 MW 18.01 MW
934621 AD1-088 C 50/50 17.53 MW 17.53 MW
934622 AD1-088 E 50/50 8.25 MW 8.25 MW
939411 AE1-173 C 50/50 144.74 MW 144.74 MW
939412 AE1-173 E 50/50 96.49 MW 96.49 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
933981 AD1-022 C Adder 11.79 MW 10.02 MW
933982 AD1-022 E Adder 6.42 MW 5.46 MW
962572 AG1-106 E Adder 1.6 MW 1.36 MW
961681 AG1-008 C Adder 18.99 MW 16.14 MW
961682 AG1-008 E Adder 9.6 MW 8.16 MW
962571 AG1-106 C Adder 3.65 MW 3.1 MW
314594 6PLYMOUTH TP Adder 0.44 MW 0.37 MW
314632 6AYDLETT TAP 50/50 1.83 MW 1.83 MW
316185 AD1-033 C 50/50 1.66 MW 1.66 MW
316263 AC1-034 C Adder 8.85 MW 7.52 MW
316274 AC1-208 C Adder 12.05 MW 10.24 MW
316294 AC1-161 C 50/50 6.87 MW 6.87 MW
316315 AB2-025 C 50/50 0.56 MW 0.56 MW
316316 AC1-027 C 50/50 0.42 MW 0.42 MW
917332 KELFORD E Adder 2.2 MW 1.87 MW
924516 AB2-100 E1 Adder 3.93 MW 3.34 MW
924517 AB2-100 E2 Adder 3.93 MW 3.34 MW
925595 AC1-034 E Adder 6.68 MW 5.67 MW
926206 AC1-098 E Adder 4.88 MW 4.15 MW
926214 AC1-099 E Adder 1.61 MW 1.37 MW
927255 AC1-221 E Adder 4.85 MW 4.12 MW
932763 AC2-100 E Adder 2.91 MW 2.47 MW
934065 AD1-033 E 50/50 6.79 MW 6.79 MW
937226 AE2-253 E 50/50 7.91 MW 7.91 MW
918512 AA1-065 E OP Adder 7.43 MW 6.31 MW
316017 AA1-139 ULT1 50/50 1.46 MW 1.46 MW
316018 AA1-139 ULT2 50/50 1.46 MW 1.46 MW
919153 AA1-139 E2 50/50 5.53 MW 5.53 MW
919152 AA1-139 E1 50/50 5.53 MW 5.53 MW
919710 AA2-057 E Adder 5.3 MW 4.5 MW
920692 AA2-178 E Adder 5.54 MW 4.71 MW
923994 AB2-040_E Adder 8.22 MW 6.99 MW
924022 AB2-043 E O1 Adder 6.36 MW 5.4 MW
924152 AB2-059 E OP Adder 7.04 MW 5.98 MW
316084 AB2-161 E Adder 6.56 MW 5.57 MW
925122 AB2-169 E Adder 7.72 MW 6.56 MW
316088 AB2-174 E Adder 8.71 MW 7.41 MW
316375 AC2-012 C 50/50 1.8 MW 1.8 MW
932046 AC2-012 E 50/50 17.55 MW 17.55 MW
316311 AC2-079 C Adder 7.32 MW 6.22 MW
932596 AC2-079 E Adder 11.95 MW 10.15 MW
934576 AD1-082 E Adder 5.22 MW 4.44 MW
316349 AD2-085 C Adder 4.37 MW 3.71 MW
936666 AD2-085 E Adder 7.13 MW 6.06 MW
316388 AE2-253 GEN 50/50 2.65 MW 2.65 MW
941591 AE2-156 C 50/50 24.01 MW 24.01 MW
944581 AF1-123 C 50/50 62.37 MW 62.37 MW
944582 AF1-123 E 50/50 142.83 MW 142.83 MW
944591 AF1-124 C 50/50 62.6 MW 62.6 MW
944592 AF1-124 E 50/50 143.35 MW 143.35 MW
944601 AF1-125 C 50/50 61.41 MW 61.41 MW
944602 AF1-125 E 50/50 140.59 MW 140.59 MW
962491 AG1-098 C 50/50 15.55 MW 15.55 MW
962492 AG1-098 E 50/50 10.37 MW 10.37 MW
962561 AG1-105 C Adder 11.12 MW 9.45 MW
962562 AG1-105 E Adder 7.41 MW 6.3 MW
313764 3SOCKMAN Adder 0.95 MW 0.81 MW
932632 AC2-084 E Adder 4.32 MW 3.67 MW
934321 AD1-056 C Adder 8.38 MW 7.12 MW
934322 AD1-056 E Adder 4.54 MW 3.86 MW
934331 AD1-057 C Adder 4.67 MW 3.97 MW
934332 AD1-057 E Adder 2.43 MW 2.07 MW
934501 AD1-074 C Adder 45.36 MW 38.56 MW
934502 AD1-074 E Adder 23.09 MW 19.63 MW
934511 AD1-075 C Adder 11.34 MW 9.64 MW
934512 AD1-075 E Adder 5.77 MW 4.91 MW
934611 AD1-087 C 50/50 1.77 MW 1.77 MW
934612 AD1-087 E 50/50 5.14 MW 5.14 MW
935172 AD1-152 E Adder 7.57 MW 6.44 MW
937481 AD2-202 C 50/50 0.52 MW 0.52 MW
937482 AD2-202 E 50/50 1.5 MW 1.5 MW
938531 AE1-072 C 50/50 23.77 MW 23.77 MW
938532 AE1-072 E 50/50 12.39 MW 12.39 MW
939191 AE1-149 C Adder 12.1 MW 10.29 MW
939192 AE1-149 E Adder 8.07 MW 6.86 MW
940481 AE2-033 C 50/50 22.31 MW 22.31 MW
940482 AE2-033 E 50/50 15.04 MW 15.04 MW
940541 AE2-040 C 50/50 3.97 MW 3.97 MW
940641 AE2-051 C 50/50 28.87 MW 28.87 MW
940642 AE2-051 E 50/50 19.25 MW 19.25 MW
941101 AE2-104 C Adder 4.44 MW 3.77 MW
941102 AE2-104 E Adder 7.06 MW 6.0 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 55.26 MW 55.26 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 35.54 MW 35.54 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 136.08 MW 136.08 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.66 MW 5.66 MW
NY PJM->LTFIMP_NY CLTF 2.58 MW 2.58 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.19 MW 2.19 MW
WEC LTFEXP_WEC->PJM CLTF 1.14 MW 1.14 MW
CPLE LTFEXP_CPLE->PJM CLTF 15.98 MW 15.98 MW
TVA LTFEXP_TVA->PJM CLTF 9.35 MW 9.35 MW
MEC LTFEXP_MEC->PJM CLTF 6.59 MW 6.59 MW
LAGN LTFEXP_LAGN->PJM CLTF 11.8 MW 11.8 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.42 MW 0.42 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.0 MW 36.0 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.62 MW 7.62 MW

Details for 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P4-2: SPOTS H1T594_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
Contingency Name:
DVP_P4-2: SPOTS H1T594_SRT-S
CONTINGENCY 'DVP_P4-2: SPOTS H1T594_SRT-S'
 OPEN BRANCH FROM BUS 314755 TO BUS 314934 CKT 1                /*3SPOTSYL     115.0 - 8SPOTSYL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 112.93 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4449.5 MVA
MW Contribution: 109.76 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.73 MW 0.62 MW
961672 AG1-007 E Adder 0.41 MW 0.35 MW
961791 AG1-021 C Adder 1.49 MW 1.27 MW
961792 AG1-021 E Adder 1.27 MW 1.08 MW
961941 AG1-037 C Adder 0.39 MW 0.33 MW
961942 AG1-037 E Adder 0.26 MW 0.22 MW
962331 AG1-082 C Adder 1.57 MW 1.33 MW
962332 AG1-082 E Adder 1.04 MW 0.89 MW
963041 AG1-153 C Adder 5.36 MW 4.56 MW
963042 AG1-153 E Adder 8.04 MW 6.84 MW
963171 AG1-166 C Adder 0.83 MW 0.7 MW
963172 AG1-166 E Adder 1.94 MW 1.65 MW
963181 AG1-167 C Adder 0.62 MW 0.53 MW
963182 AG1-167 E Adder 1.45 MW 1.23 MW
963191 AG1-168 C Adder 0.62 MW 0.53 MW
963192 AG1-168 E Adder 1.45 MW 1.23 MW
964791 AG1-342 C Adder 2.89 MW 2.46 MW
964792 AG1-342 E Adder 1.93 MW 1.64 MW
966801 AG1-551 C Adder 1.62 MW 1.38 MW
966802 AG1-551 E Adder 0.85 MW 0.73 MW
966811 AG1-552 C Adder 1.64 MW 1.4 MW
966812 AG1-552 E Adder 0.78 MW 0.67 MW
965291 AG1-394 C Adder 0.66 MW 0.56 MW
965292 AG1-394 E Adder 1.22 MW 1.04 MW
966621 AG1-532 C Adder 1.14 MW 0.97 MW
966622 AG1-532 E Adder 0.76 MW 0.65 MW
313853 3PONTONDP Adder 0.55 MW 0.47 MW
314541 3WATKINS Adder 0.53 MW 0.45 MW
314572 3EMPORIA Adder 0.35 MW 0.3 MW
314713 3PAMPLIN Adder 0.83 MW 0.7 MW
315131 1EDGECMA Adder 12.12 MW 10.3 MW
918492 AA1-063AE OP Adder 3.23 MW 2.75 MW
918532 AA1-067 E Adder 0.55 MW 0.47 MW
919692 AA2-053 E OP Adder 3.36 MW 2.86 MW
920042 AA2-088 E OP Adder 8.23 MW 6.99 MW
925785 AC1-054 E Adder 2.8 MW 2.38 MW
926274 AC1-105 E Adder 2.18 MW 1.85 MW
927146 AC1-208 E Adder 3.16 MW 2.69 MW
934521 AD1-076 C Adder 9.33 MW 7.93 MW
934522 AD1-076 E Adder 4.76 MW 4.04 MW
943172 AE2-346 E Adder 0.47 MW 0.4 MW
943902 AF1-058 E Adder 1.04 MW 0.89 MW
944011 AF1-069 C 50/50 12.66 MW 12.66 MW
944012 AF1-069 E 50/50 4.92 MW 4.92 MW
959311 AF2-222 C Adder 13.84 MW 11.76 MW
959312 AF2-222 E Adder 9.27 MW 7.88 MW
960061 AF2-297 C Adder 6.26 MW 5.33 MW
960062 AF2-297 E Adder 4.18 MW 3.55 MW
960081 AF2-299 C Adder 1.53 MW 1.3 MW
960082 AF2-299 E Adder 1.02 MW 0.86 MW
316141 AB2-099 E Adder 0.2 MW 0.17 MW
900672 V4-068 E Adder 0.28 MW 0.23 MW
917342 Z2-044 E Adder 0.47 MW 0.4 MW
922923 AB1-081 E OP Adder 2.91 MW 2.48 MW
923263 AB1-132 E OP Adder 4.88 MW 4.15 MW
923573 AB1-173 E OP Adder 2.66 MW 2.26 MW
924162 AB2-060 E OP Adder 3.55 MW 3.02 MW
924302 AB2-077 E O1 Adder 1.11 MW 0.94 MW
924312 AB2-078 E O1 Adder 1.11 MW 0.94 MW
924322 AB2-079 E O1 Adder 1.11 MW 0.94 MW
925612 AC1-036 E Adder 0.71 MW 0.61 MW
938371 AE1-056 C Adder 5.36 MW 4.56 MW
938372 AE1-056 E Adder 2.93 MW 2.49 MW
939181 AE1-148 C Adder 7.46 MW 6.34 MW
939182 AE1-148 E Adder 4.97 MW 4.22 MW
940492 AE2-034 E Adder 2.34 MW 1.99 MW
941031 AE2-094 C 50/50 38.74 MW 38.74 MW
941032 AE2-094 E 50/50 17.35 MW 17.35 MW
946281 AF1-292 C Adder 1.26 MW 1.07 MW
946282 AF1-292 E Adder 0.84 MW 0.72 MW
946301 AF1-294 C Adder 3.07 MW 2.61 MW
946302 AF1-294 E Adder 2.6 MW 2.21 MW
957481 AF2-042 C Adder 49.08 MW 41.72 MW
957482 AF2-042 E Adder 32.72 MW 27.81 MW
957521 AF2-046 C Adder 11.02 MW 9.37 MW
957522 AF2-046 E Adder 5.57 MW 4.73 MW
957861 AF2-080 C Adder 5.93 MW 5.04 MW
957862 AF2-080 E Adder 2.63 MW 2.23 MW
958211 AF2-115 C Adder 1.87 MW 1.59 MW
958212 AF2-115 E Adder 1.59 MW 1.35 MW
314539 3UNCAMP Adder 4.63 MW 3.93 MW
916042 Z1-036 E Adder 21.5 MW 18.27 MW
938771 AE1-103 C Adder 2.22 MW 1.89 MW
938772 AE1-103 E Adder 3.06 MW 2.6 MW
924032 AB2-045 E Adder 1.09 MW 0.93 MW
933502 AC2-165 E Adder 6.93 MW 5.89 MW
314331 6POE Adder 1.04 MW 0.89 MW
314507 3THOMPSN Adder 1.48 MW 1.26 MW
314525 6KINGFORK Adder 0.72 MW 0.62 MW
314550 6HICKORY Adder 1.62 MW 1.37 MW
315083 1SPRUNCA Adder 6.12 MW 5.21 MW
315084 1SPRUNCB Adder 6.12 MW 5.21 MW
926662 AC1-147 E Adder 0.97 MW 0.83 MW
926755 AC1-161 E Adder 9.51 MW 8.08 MW
935112 AD1-144 E Adder 0.67 MW 0.57 MW
942341 AE2-247 C Adder 1.1 MW 0.93 MW
942342 AE2-247 E Adder 1.52 MW 1.29 MW
943461 AF1-017 C Adder 0.99 MW 0.84 MW
943462 AF1-017 E Adder 1.62 MW 1.38 MW
943612 AF1-032 E Adder 0.68 MW 0.58 MW
958502 AF2-144 E Adder 1.16 MW 0.98 MW
315172 1LOISA A 50/50 3.09 MW 3.09 MW
315173 1LOISA B 50/50 3.11 MW 3.11 MW
315174 1LOISA C 50/50 3.11 MW 3.11 MW
315175 1LOISA D 50/50 3.11 MW 3.11 MW
315176 1LOISA E 50/50 6.33 MW 6.33 MW
315177 1S ANNAG1 50/50 3.05 MW 3.05 MW
315178 1S ANNAS1 50/50 1.57 MW 1.57 MW
315179 1S ANNAG2 50/50 3.05 MW 3.05 MW
315180 1S ANNAS2 50/50 1.57 MW 1.57 MW
315225 1N ANNA1 50/50 106.86 MW 106.86 MW
315226 1N ANNA2 50/50 106.89 MW 106.89 MW
315260 1GOSPORTA Adder 1.56 MW 1.33 MW
315261 1GOSPORTB Adder 2.0 MW 1.7 MW
315262 1GOSPORTC Adder 1.7 MW 1.44 MW
913392 Y1-086 E Adder 1.64 MW 1.39 MW
916192 Z1-068 E Adder 1.39 MW 1.18 MW
923832 AB2-022 E Adder 0.92 MW 0.79 MW
923852 AB2-025 E Adder 0.98 MW 0.83 MW
923862 AB2-026 E Adder 1.18 MW 1.0 MW
925022 AB2-158 E 50/50 11.37 MW 11.37 MW
938552 AE1-074 E Adder 1.09 MW 0.93 MW
938562 AE1-075 E Adder 1.0 MW 0.85 MW
939312 AE1-162 E Adder 0.98 MW 0.83 MW
957492 AF2-043 E Adder 1.05 MW 0.9 MW
966001 AG1-469 C 50/50 2.01 MW 2.01 MW
966002 AG1-469 E 50/50 1.0 MW 1.0 MW
901082 W1-029 E Adder 23.78 MW 20.22 MW
917122 Z2-027 E Adder 1.0 MW 0.85 MW
925522 AC1-027 E Adder 0.9 MW 0.76 MW
942001 AE2-212 C Adder 1.49 MW 1.26 MW
942002 AE2-212 E Adder 0.99 MW 0.84 MW
957871 AF2-081 C Adder 7.41 MW 6.3 MW
957872 AF2-081 E Adder 3.18 MW 2.7 MW
958161 AF2-110 C Adder 1.02 MW 0.86 MW
958162 AF2-110 E Adder 1.62 MW 1.37 MW
314722 3TWITTYS Adder 0.79 MW 0.67 MW
917512 Z2-088 E OP1 Adder 3.81 MW 3.23 MW
926071 AC1-086 C Adder 16.78 MW 14.27 MW
926072 AC1-086 E Adder 7.64 MW 6.49 MW
927021 AC1-189 C Adder 6.53 MW 5.55 MW
927022 AC1-189 E Adder 3.25 MW 2.76 MW
936261 AD2-033 C Adder 10.8 MW 9.18 MW
936262 AD2-033 E Adder 7.2 MW 6.12 MW
933291 AC2-141 C Adder 22.28 MW 18.93 MW
933292 AC2-141 E Adder 9.51 MW 8.08 MW
934621 AD1-088 C Adder 11.37 MW 9.66 MW
934622 AD1-088 E Adder 5.35 MW 4.55 MW
939411 AE1-173 C Adder 81.87 MW 69.59 MW
939412 AE1-173 E Adder 54.58 MW 46.4 MW
933981 AD1-022 C Adder 6.7 MW 5.69 MW
933982 AD1-022 E Adder 3.65 MW 3.1 MW
962572 AG1-106 E Adder 0.95 MW 0.81 MW
961681 AG1-008 C Adder 11.02 MW 9.37 MW
961682 AG1-008 E Adder 5.57 MW 4.73 MW
962571 AG1-106 C Adder 2.17 MW 1.84 MW
208900 BRIS G1 50/50 -2.49 MW -2.49 MW
208901 BRIS G2 50/50 -2.94 MW -2.94 MW
314594 6PLYMOUTH TP Adder 0.25 MW 0.21 MW
314632 6AYDLETT TAP Adder 1.01 MW 0.86 MW
316192 AB2-158 C 50/50 4.28 MW 4.28 MW
316233 AE1-074 C Adder 2.17 MW 1.85 MW
316263 AC1-034 C Adder 5.19 MW 4.41 MW
316274 AC1-208 C Adder 7.11 MW 6.05 MW
316336 AC2-165 C Adder 9.2 MW 7.82 MW
917332 KELFORD E Adder 1.28 MW 1.09 MW
924516 AB2-100 E1 Adder 2.37 MW 2.01 MW
924517 AB2-100 E2 Adder 2.37 MW 2.01 MW
925595 AC1-034 E Adder 3.91 MW 3.33 MW
926206 AC1-098 E Adder 2.87 MW 2.44 MW
926214 AC1-099 E Adder 0.95 MW 0.81 MW
927255 AC1-221 E Adder 2.96 MW 2.52 MW
927264 AC1-222 E Adder 3.21 MW 2.73 MW
932763 AC2-100 E Adder 2.01 MW 1.71 MW
934065 AD1-033 E Adder 3.71 MW 3.16 MW
937226 AE2-253 E Adder 4.33 MW 3.68 MW
918512 AA1-065 E OP Adder 4.26 MW 3.62 MW
919153 AA1-139 E2 Adder 3.03 MW 2.58 MW
919152 AA1-139 E1 Adder 3.03 MW 2.58 MW
919710 AA2-057 E Adder 3.11 MW 2.65 MW
920692 AA2-178 E Adder 3.12 MW 2.65 MW
923994 AB2-040_E Adder 4.98 MW 4.23 MW
924022 AB2-043 E O1 Adder 4.3 MW 3.65 MW
924152 AB2-059 E OP Adder 4.12 MW 3.51 MW
316084 AB2-161 E Adder 4.02 MW 3.42 MW
925122 AB2-169 E Adder 4.41 MW 3.75 MW
316088 AB2-174 E Adder 5.29 MW 4.5 MW
316044 AC1-158 C1 50/50 19.57 MW 19.57 MW
316045 AC1-158 C2 50/50 19.57 MW 19.57 MW
926739 AC1-158 E1 50/50 51.19 MW 51.19 MW
926740 AC1-158 E2 50/50 51.19 MW 51.19 MW
932046 AC2-012 E Adder 9.62 MW 8.18 MW
316311 AC2-079 C Adder 4.23 MW 3.59 MW
932596 AC2-079 E Adder 6.9 MW 5.86 MW
934576 AD1-082 E Adder 3.2 MW 2.72 MW
316349 AD2-085 C Adder 2.53 MW 2.15 MW
936666 AD2-085 E Adder 4.14 MW 3.52 MW
941591 AE2-156 C Adder 13.16 MW 11.18 MW
944581 AF1-123 C Adder 33.89 MW 28.81 MW
944582 AF1-123 E Adder 77.61 MW 65.97 MW
944591 AF1-124 C Adder 34.01 MW 28.91 MW
944592 AF1-124 E Adder 77.89 MW 66.2 MW
944601 AF1-125 C Adder 33.37 MW 28.36 MW
944602 AF1-125 E Adder 76.39 MW 64.93 MW
962491 AG1-098 C Adder 10.18 MW 8.66 MW
962492 AG1-098 E Adder 6.79 MW 5.77 MW
962561 AG1-105 C Adder 7.27 MW 6.18 MW
962562 AG1-105 E Adder 4.85 MW 4.12 MW
964241 AG1-285 C Adder 10.39 MW 8.83 MW
964242 AG1-285 E Adder 6.93 MW 5.89 MW
313764 3SOCKMAN Adder 0.57 MW 0.49 MW
932632 AC2-084 E Adder 2.54 MW 2.15 MW
934321 AD1-056 C Adder 4.94 MW 4.2 MW
934322 AD1-056 E Adder 2.68 MW 2.28 MW
934331 AD1-057 C Adder 2.75 MW 2.34 MW
934332 AD1-057 E Adder 1.43 MW 1.22 MW
934501 AD1-074 C Adder 25.7 MW 21.84 MW
934502 AD1-074 E Adder 13.08 MW 11.12 MW
934511 AD1-075 C Adder 6.42 MW 5.46 MW
934512 AD1-075 E Adder 3.27 MW 2.78 MW
934612 AD1-087 E Adder 3.22 MW 2.73 MW
935172 AD1-152 E Adder 4.73 MW 4.02 MW
937482 AD2-202 E Adder 0.94 MW 0.8 MW
938531 AE1-072 C Adder 13.04 MW 11.09 MW
938532 AE1-072 E Adder 6.8 MW 5.78 MW
939191 AE1-149 C Adder 7.73 MW 6.57 MW
939192 AE1-149 E Adder 5.15 MW 4.38 MW
940481 AE2-033 C Adder 13.56 MW 11.52 MW
940482 AE2-033 E Adder 9.14 MW 7.77 MW
940541 AE2-040 C Adder 2.41 MW 2.05 MW
940641 AE2-051 C 50/50 16.48 MW 16.48 MW
940642 AE2-051 E 50/50 10.99 MW 10.99 MW
941101 AE2-104 C Adder 2.49 MW 2.12 MW
941102 AE2-104 E Adder 3.96 MW 3.36 MW
942461 AE2-259 C Adder 8.28 MW 7.04 MW
942462 AE2-259 E Adder 5.52 MW 4.69 MW
316303 AF2-085 50/50 4.05 MW 4.05 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 20.0 MW 20.0 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.82 MW 16.82 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 77.12 MW 77.12 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.06 MW 5.06 MW
NY PJM->LTFIMP_NY CLTF 2.37 MW 2.37 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.87 MW 0.87 MW
WEC LTFEXP_WEC->PJM CLTF 0.43 MW 0.43 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.25 MW 9.25 MW
TVA LTFEXP_TVA->PJM CLTF 4.72 MW 4.72 MW
MEC LTFEXP_MEC->PJM CLTF 2.78 MW 2.78 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.96 MW 5.96 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.17 MW 0.17 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 32.2 MW 32.2 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.41 MW 4.41 MW

Details for 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P4-2: 568T575_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
Contingency Name:
DVP_P4-2: 568T575_SRT-A
CONTINGENCY 'DVP_P4-2: 568T575_SRT-A'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 112.18 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4419.9 MVA
MW Contribution: 139.5 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C Adder 1.68 MW 1.43 MW
961792 AG1-021 E Adder 1.43 MW 1.22 MW
961941 AG1-037 C Adder 0.48 MW 0.41 MW
961942 AG1-037 E Adder 0.32 MW 0.27 MW
962331 AG1-082 C Adder 1.9 MW 1.62 MW
962332 AG1-082 E Adder 1.27 MW 1.08 MW
963041 AG1-153 C 50/50 5.92 MW 5.92 MW
963042 AG1-153 E 50/50 8.88 MW 8.88 MW
963171 AG1-166 C Adder 0.94 MW 0.8 MW
963172 AG1-166 E Adder 2.18 MW 1.85 MW
963181 AG1-167 C Adder 0.7 MW 0.6 MW
963182 AG1-167 E Adder 1.64 MW 1.39 MW
963191 AG1-168 C Adder 0.7 MW 0.6 MW
963192 AG1-168 E Adder 1.64 MW 1.39 MW
966811 AG1-552 C Adder 1.95 MW 1.66 MW
966812 AG1-552 E Adder 0.93 MW 0.79 MW
965291 AG1-394 C Adder 0.81 MW 0.69 MW
965292 AG1-394 E Adder 1.49 MW 1.27 MW
966621 AG1-532 C Adder 1.35 MW 1.15 MW
966622 AG1-532 E Adder 0.9 MW 0.76 MW
313853 3PONTONDP Adder 0.62 MW 0.53 MW
314541 3WATKINS Adder 0.65 MW 0.56 MW
314572 3EMPORIA Adder 0.41 MW 0.35 MW
314713 3PAMPLIN Adder 0.93 MW 0.79 MW
918492 AA1-063AE OP Adder 3.88 MW 3.29 MW
919692 AA2-053 E OP Adder 4.01 MW 3.41 MW
920042 AA2-088 E OP Adder 10.05 MW 8.54 MW
925785 AC1-054 E Adder 3.25 MW 2.76 MW
934521 AD1-076 C Adder 11.52 MW 9.79 MW
934522 AD1-076 E Adder 5.87 MW 4.99 MW
943172 AE2-346 E Adder 0.57 MW 0.49 MW
944011 AF1-069 C 50/50 13.93 MW 13.93 MW
944012 AF1-069 E 50/50 5.41 MW 5.41 MW
959311 AF2-222 C Adder 15.66 MW 13.31 MW
959312 AF2-222 E Adder 10.49 MW 8.92 MW
960081 AF2-299 C Adder 1.8 MW 1.53 MW
960082 AF2-299 E Adder 1.2 MW 1.02 MW
316141 AB2-099 E Adder 0.24 MW 0.2 MW
900672 V4-068 E Adder 0.34 MW 0.29 MW
923263 AB1-132 E OP Adder 5.81 MW 4.94 MW
923573 AB1-173 E OP Adder 3.14 MW 2.67 MW
924162 AB2-060 E OP Adder 4.03 MW 3.43 MW
924302 AB2-077 E O1 Adder 1.26 MW 1.07 MW
924312 AB2-078 E O1 Adder 1.26 MW 1.07 MW
924322 AB2-079 E O1 Adder 1.26 MW 1.07 MW
925612 AC1-036 E Adder 0.81 MW 0.69 MW
938371 AE1-056 C Adder 6.04 MW 5.13 MW
938372 AE1-056 E Adder 3.3 MW 2.81 MW
939181 AE1-148 C Adder 8.51 MW 7.23 MW
939182 AE1-148 E Adder 5.67 MW 4.82 MW
940492 AE2-034 E Adder 2.9 MW 2.47 MW
941031 AE2-094 C 50/50 42.63 MW 42.63 MW
941032 AE2-094 E 50/50 19.09 MW 19.09 MW
946281 AF1-292 C Adder 1.49 MW 1.26 MW
946282 AF1-292 E Adder 0.99 MW 0.84 MW
946301 AF1-294 C Adder 3.46 MW 2.94 MW
946302 AF1-294 E Adder 2.93 MW 2.49 MW
957481 AF2-042 C Adder 54.52 MW 46.34 MW
957482 AF2-042 E Adder 36.34 MW 30.89 MW
957521 AF2-046 C Adder 13.42 MW 11.4 MW
957522 AF2-046 E Adder 6.78 MW 5.76 MW
958211 AF2-115 C Adder 2.1 MW 1.79 MW
958212 AF2-115 E Adder 1.79 MW 1.52 MW
314539 3UNCAMP Adder 5.75 MW 4.89 MW
916042 Z1-036 E Adder 26.93 MW 22.89 MW
938771 AE1-103 C Adder 2.77 MW 2.35 MW
938772 AE1-103 E Adder 3.82 MW 3.25 MW
933502 AC2-165 E Adder 7.68 MW 6.53 MW
314331 6POE Adder 1.31 MW 1.11 MW
314507 3THOMPSN Adder 1.9 MW 1.61 MW
314525 6KINGFORK Adder 0.94 MW 0.8 MW
314550 6HICKORY Adder 2.06 MW 1.75 MW
315083 1SPRUNCA Adder 8.25 MW 7.01 MW
315084 1SPRUNCB Adder 8.25 MW 7.01 MW
926662 AC1-147 E Adder 1.25 MW 1.06 MW
926755 AC1-161 E Adder 12.2 MW 10.37 MW
935112 AD1-144 E Adder 0.87 MW 0.74 MW
942341 AE2-247 C Adder 1.4 MW 1.19 MW
942342 AE2-247 E Adder 1.94 MW 1.65 MW
943461 AF1-017 C Adder 1.27 MW 1.08 MW
943462 AF1-017 E Adder 2.07 MW 1.76 MW
943612 AF1-032 E Adder 0.87 MW 0.74 MW
958502 AF2-144 E Adder 1.28 MW 1.09 MW
315102 1BRUNSWICKG1 50/50 8.7 MW 8.7 MW
315103 1BRUNSWICKG2 50/50 8.7 MW 8.7 MW
315104 1BRUNSWICKG3 50/50 8.7 MW 8.7 MW
315105 1BRUNSWICKS1 50/50 18.08 MW 18.08 MW
315173 1LOISA B 50/50 2.42 MW 2.42 MW
315175 1LOISA D 50/50 2.42 MW 2.42 MW
315176 1LOISA E 50/50 4.93 MW 4.93 MW
315177 1S ANNAG1 50/50 2.4 MW 2.4 MW
315178 1S ANNAS1 50/50 1.23 MW 1.23 MW
315179 1S ANNAG2 50/50 2.4 MW 2.4 MW
315180 1S ANNAS2 50/50 1.23 MW 1.23 MW
315225 1N ANNA1 50/50 93.2 MW 93.2 MW
315226 1N ANNA2 50/50 93.23 MW 93.23 MW
315241 1Z1-086 GT1 50/50 11.15 MW 11.15 MW
315242 1Z1-086 GT2 50/50 11.15 MW 11.15 MW
315243 1Z1-086 GT3 50/50 11.15 MW 11.15 MW
315244 1Z1-086 ST 50/50 19.42 MW 19.42 MW
315260 1GOSPORTA Adder 2.0 MW 1.7 MW
315261 1GOSPORTB Adder 2.56 MW 2.17 MW
315262 1GOSPORTC Adder 2.17 MW 1.85 MW
913392 Y1-086 E Adder 2.07 MW 1.76 MW
916192 Z1-068 E Adder 1.77 MW 1.5 MW
923832 AB2-022 E Adder 1.17 MW 0.99 MW
923852 AB2-025 E Adder 1.15 MW 0.98 MW
923862 AB2-026 E Adder 1.3 MW 1.11 MW
925022 AB2-158 E 50/50 9.54 MW 9.54 MW
938552 AE1-074 E 50/50 1.31 MW 1.31 MW
938562 AE1-075 E Adder 1.11 MW 0.94 MW
939312 AE1-162 E Adder 1.3 MW 1.1 MW
946262 AF1-291 E Adder 1.26 MW 1.07 MW
957492 AF2-043 E Adder 1.34 MW 1.14 MW
966001 AG1-469 C Adder 1.46 MW 1.24 MW
966002 AG1-469 E Adder 0.73 MW 0.62 MW
901082 W1-029 E Adder 30.04 MW 25.54 MW
917122 Z2-027 E Adder 1.27 MW 1.08 MW
925522 AC1-027 E Adder 1.15 MW 0.97 MW
942001 AE2-212 C Adder 1.97 MW 1.68 MW
942002 AE2-212 E Adder 1.31 MW 1.12 MW
957871 AF2-081 C Adder 9.42 MW 8.01 MW
957872 AF2-081 E Adder 4.04 MW 3.43 MW
958161 AF2-110 C Adder 1.29 MW 1.1 MW
958162 AF2-110 E Adder 2.05 MW 1.74 MW
314722 3TWITTYS Adder 0.89 MW 0.76 MW
926071 AC1-086 C Adder 19.97 MW 16.98 MW
926072 AC1-086 E Adder 9.09 MW 7.73 MW
936261 AD2-033 C Adder 12.24 MW 10.4 MW
936262 AD2-033 E Adder 8.16 MW 6.93 MW
933291 AC2-141 C Adder 28.58 MW 24.29 MW
933292 AC2-141 E Adder 12.2 MW 10.37 MW
934621 AD1-088 C Adder 12.65 MW 10.76 MW
934622 AD1-088 E Adder 5.95 MW 5.06 MW
939411 AE1-173 C 50/50 94.28 MW 94.28 MW
939412 AE1-173 E 50/50 62.86 MW 62.86 MW
933981 AD1-022 C Adder 8.24 MW 7.01 MW
933982 AD1-022 E Adder 4.49 MW 3.81 MW
962572 AG1-106 E Adder 1.13 MW 0.96 MW
961681 AG1-008 C Adder 13.42 MW 11.4 MW
961682 AG1-008 E Adder 6.78 MW 5.76 MW
962571 AG1-106 C Adder 2.58 MW 2.2 MW
208901 BRIS G2 50/50 -3.24 MW -3.24 MW
314594 6PLYMOUTH TP Adder 0.3 MW 0.26 MW
314632 6AYDLETT TAP Adder 1.28 MW 1.09 MW
316192 AB2-158 C 50/50 3.59 MW 3.59 MW
316233 AE1-074 C 50/50 2.59 MW 2.59 MW
316240 AF1-291 C Adder 1.89 MW 1.61 MW
316336 AC2-165 C Adder 10.2 MW 8.67 MW
917332 KELFORD E Adder 1.55 MW 1.31 MW
924516 AB2-100 E1 Adder 2.8 MW 2.38 MW
924517 AB2-100 E2 Adder 2.8 MW 2.38 MW
934065 AD1-033 E Adder 4.73 MW 4.02 MW
937226 AE2-253 E Adder 5.51 MW 4.68 MW
918512 AA1-065 E OP Adder 5.2 MW 4.42 MW
919153 AA1-139 E2 Adder 3.85 MW 3.27 MW
919152 AA1-139 E1 Adder 3.85 MW 3.27 MW
920692 AA2-178 E Adder 3.87 MW 3.29 MW
923994 AB2-040_E Adder 5.88 MW 5.0 MW
924022 AB2-043 E O1 Adder 4.89 MW 4.15 MW
316084 AB2-161 E Adder 5.17 MW 4.4 MW
316088 AB2-174 E Adder 6.25 MW 5.31 MW
932046 AC2-012 E Adder 12.32 MW 10.47 MW
316311 AC2-079 C Adder 5.39 MW 4.58 MW
932596 AC2-079 E Adder 8.8 MW 7.48 MW
934576 AD1-082 E Adder 4.12 MW 3.5 MW
316349 AD2-085 C Adder 3.24 MW 2.75 MW
936666 AD2-085 E Adder 5.28 MW 4.49 MW
961611 AG1-000B C Adder 14.0 MW 11.9 MW
941591 AE2-156 C Adder 16.84 MW 14.32 MW
944581 AF1-123 C Adder 43.08 MW 36.62 MW
944582 AF1-123 E Adder 98.64 MW 83.84 MW
944591 AF1-124 C Adder 43.23 MW 36.74 MW
944592 AF1-124 E Adder 99.0 MW 84.15 MW
944601 AF1-125 C Adder 42.41 MW 36.05 MW
944602 AF1-125 E Adder 97.09 MW 82.53 MW
962491 AG1-098 C Adder 11.33 MW 9.63 MW
962492 AG1-098 E Adder 7.56 MW 6.42 MW
964241 AG1-285 C Adder 11.8 MW 10.03 MW
964242 AG1-285 E Adder 7.87 MW 6.69 MW
965281 AG1-393 C Adder 1.92 MW 1.63 MW
965282 AG1-393 E Adder 1.28 MW 1.08 MW
313764 3SOCKMAN Adder 0.68 MW 0.58 MW
934501 AD1-074 C Adder 31.71 MW 26.95 MW
934502 AD1-074 E Adder 16.14 MW 13.72 MW
934511 AD1-075 C Adder 7.93 MW 6.74 MW
934512 AD1-075 E Adder 4.04 MW 3.43 MW
934612 AD1-087 E Adder 3.59 MW 3.05 MW
935172 AD1-152 E Adder 5.3 MW 4.5 MW
937482 AD2-202 E Adder 1.05 MW 0.89 MW
938531 AE1-072 C Adder 16.57 MW 14.08 MW
938532 AE1-072 E Adder 8.64 MW 7.34 MW
939191 AE1-149 C Adder 10.01 MW 8.51 MW
939192 AE1-149 E Adder 6.67 MW 5.67 MW
940431 AE2-027 C Adder 11.35 MW 9.65 MW
940432 AE2-027 E Adder 7.57 MW 6.43 MW
940481 AE2-033 C Adder 15.99 MW 13.6 MW
940482 AE2-033 E Adder 10.78 MW 9.16 MW
940541 AE2-040 C Adder 2.85 MW 2.42 MW
940641 AE2-051 C 50/50 18.5 MW 18.5 MW
940642 AE2-051 E 50/50 12.33 MW 12.33 MW
941101 AE2-104 C Adder 3.16 MW 2.69 MW
941102 AE2-104 E Adder 5.02 MW 4.27 MW
944641 AF1-129 C Adder 51.45 MW 43.73 MW
316303 AF2-085 50/50 4.46 MW 4.46 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 27.98 MW 27.98 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 21.36 MW 21.36 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 90.82 MW 90.82 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.57 MW 5.57 MW
NY PJM->LTFIMP_NY CLTF 2.61 MW 2.61 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.19 MW 1.19 MW
WEC LTFEXP_WEC->PJM CLTF 0.59 MW 0.59 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.75 MW 10.75 MW
TVA LTFEXP_TVA->PJM CLTF 5.88 MW 5.88 MW
MEC LTFEXP_MEC->PJM CLTF 3.68 MW 3.68 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.38 MW 7.38 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.23 MW 0.23 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 35.46 MW 35.46 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.13 MW 5.13 MW

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P4-2: 57602_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
Contingency Name:
DVP_P4-2: 57602_SRT-S
CONTINGENCY 'DVP_P4-2: 57602_SRT-S'
 OPEN BRANCH FROM BUS 314232 TO BUS 314918 CKT 1                /*6NO ANNA     230.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1                /*8MDLTHAN     500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314918 TO BUS 314934 CKT 1 /*8NO ANNA     500.0 - 8SPOTSYL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314918 TO BUS 314934 CKT 1 /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 111.72 %
Rating: 5011.0 MVA
Rating Type: C
MVA to Mitigate: 5598.44 MVA
MW Contribution: 259.75 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.82 MW 0.7 MW
961942 AG1-037 E Adder 0.55 MW 0.47 MW
962331 AG1-082 C Adder 3.29 MW 2.79 MW
962332 AG1-082 E Adder 2.19 MW 1.86 MW
963041 AG1-153 C Adder 8.3 MW 7.06 MW
963042 AG1-153 E Adder 12.45 MW 10.59 MW
965291 AG1-394 C Adder 1.4 MW 1.19 MW
965292 AG1-394 E Adder 2.58 MW 2.19 MW
966621 AG1-532 C Adder 2.18 MW 1.85 MW
966622 AG1-532 E Adder 1.45 MW 1.23 MW
314541 3WATKINS Adder 1.16 MW 0.98 MW
314572 3EMPORIA Adder 0.67 MW 0.57 MW
918492 AA1-063AE OP Adder 6.51 MW 5.53 MW
920042 AA2-088 E OP Adder 17.45 MW 14.83 MW
934521 AD1-076 C Adder 20.42 MW 17.36 MW
934522 AD1-076 E Adder 10.41 MW 8.85 MW
943172 AE2-346 E Adder 0.99 MW 0.84 MW
944011 AF1-069 C Adder 19.36 MW 16.45 MW
944012 AF1-069 E Adder 7.52 MW 6.39 MW
960081 AF2-299 C Adder 2.9 MW 2.47 MW
960082 AF2-299 E Adder 1.93 MW 1.64 MW
316141 AB2-099 E Adder 0.41 MW 0.35 MW
900672 V4-068 E Adder 0.58 MW 0.5 MW
923263 AB1-132 E OP Adder 9.0 MW 7.65 MW
940492 AE2-034 E Adder 5.2 MW 4.42 MW
941031 AE2-094 C Adder 59.25 MW 50.36 MW
941032 AE2-094 E Adder 26.54 MW 22.56 MW
946281 AF1-292 C Adder 2.4 MW 2.04 MW
946282 AF1-292 E Adder 1.6 MW 1.36 MW
957521 AF2-046 C Adder 23.18 MW 19.7 MW
957522 AF2-046 E Adder 11.71 MW 9.96 MW
314539 3UNCAMP Adder 10.28 MW 8.74 MW
916042 Z1-036 E Adder 48.93 MW 41.59 MW
938771 AE1-103 C Adder 4.98 MW 4.23 MW
938772 AE1-103 E Adder 6.88 MW 5.84 MW
314229 6MT RD221 50/50 0.22 MW 0.22 MW
314236 6NRTHEST 50/50 0.33 MW 0.33 MW
314331 6POE Adder 2.31 MW 1.96 MW
314507 3THOMPSN Adder 3.57 MW 3.03 MW
314525 6KINGFORK Adder 1.79 MW 1.52 MW
314550 6HICKORY Adder 3.83 MW 3.26 MW
315060 1CHESTF5 50/50 113.95 MW 113.95 MW
315061 1CHESTG7 50/50 6.93 MW 6.93 MW
315062 1CHESTS7 50/50 3.18 MW 3.18 MW
315063 1CHESTG8 50/50 6.82 MW 6.82 MW
315064 1CHESTS8 50/50 3.51 MW 3.51 MW
315065 1CHESTF6 Adder 34.48 MW 29.31 MW
315067 1DARBY 1 50/50 4.57 MW 4.57 MW
315068 1DARBY 2 50/50 4.57 MW 4.57 MW
315069 1DARBY 3 50/50 4.59 MW 4.59 MW
315070 1DARBY 4 50/50 4.6 MW 4.6 MW
315073 1STONECA Adder 12.27 MW 10.43 MW
315083 1SPRUNCA Adder 15.78 MW 13.41 MW
315084 1SPRUNCB Adder 15.78 MW 13.41 MW
315092 1YORKTN3 Adder 239.32 MW 203.42 MW
925865 AC1-065 E Adder 28.23 MW 23.99 MW
926412 AC1-112 E 50/50 2.05 MW 2.05 MW
926662 AC1-147 E Adder 2.34 MW 1.99 MW
926755 AC1-161 E Adder 23.2 MW 19.72 MW
927226 AC1-216 E Adder 13.74 MW 11.68 MW
934392 AD1-063 E Adder 1.82 MW 1.55 MW
935112 AD1-144 E Adder 1.66 MW 1.41 MW
942341 AE2-247 C Adder 2.6 MW 2.21 MW
942342 AE2-247 E Adder 3.59 MW 3.05 MW
943461 AF1-017 C Adder 2.35 MW 2.0 MW
943462 AF1-017 E Adder 3.83 MW 3.26 MW
943612 AF1-032 E Adder 1.62 MW 1.38 MW
966871 AG1-558 C Adder 4.08 MW 3.47 MW
966872 AG1-558 E Adder 2.06 MW 1.75 MW
315233 1SURRY 2 50/50 45.81 MW 45.81 MW
315260 1GOSPORTA Adder 3.76 MW 3.2 MW
315261 1GOSPORTB Adder 4.81 MW 4.09 MW
315262 1GOSPORTC Adder 4.08 MW 3.47 MW
316075 AC2-137 C 50/50 0.69 MW 0.69 MW
316076 AC2-137 E 50/50 2.42 MW 2.42 MW
316157 AD2-030 E Adder 2.0 MW 1.7 MW
913392 Y1-086 E Adder 3.83 MW 3.25 MW
916192 Z1-068 E Adder 3.32 MW 2.82 MW
923832 AB2-022 E Adder 2.16 MW 1.84 MW
923842 AB2-024 E Adder 3.07 MW 2.61 MW
923852 AB2-025 E Adder 1.84 MW 1.56 MW
930122 AB1-027 E 50/50 2.52 MW 2.52 MW
938552 AE1-074 E Adder 2.06 MW 1.75 MW
939312 AE1-162 E Adder 2.54 MW 2.16 MW
946262 AF1-291 E Adder 2.52 MW 2.14 MW
957492 AF2-043 E Adder 2.49 MW 2.12 MW
957601 AF2-054 C Adder 3.56 MW 3.03 MW
957602 AF2-054 E Adder 2.37 MW 2.02 MW
962962 AG1-145 E 50/50 2.63 MW 2.63 MW
962971 AG1-146 C Adder 4.9 MW 4.16 MW
962972 AG1-146 E Adder 3.26 MW 2.77 MW
962981 AG1-147 C Adder 11.42 MW 9.71 MW
962982 AG1-147 E Adder 7.62 MW 6.47 MW
901082 W1-029 E Adder 55.27 MW 46.98 MW
917122 Z2-027 E Adder 2.34 MW 1.99 MW
925332 AB2-190 E Adder 14.36 MW 12.21 MW
925522 AC1-027 E Adder 2.15 MW 1.82 MW
942001 AE2-212 C Adder 3.74 MW 3.18 MW
942002 AE2-212 E Adder 2.49 MW 2.12 MW
957832 AF2-077 E Adder 2.49 MW 2.12 MW
957871 AF2-081 C Adder 17.52 MW 14.89 MW
957872 AF2-081 E Adder 7.51 MW 6.38 MW
958161 AF2-110 C Adder 2.38 MW 2.03 MW
958162 AF2-110 E Adder 3.79 MW 3.22 MW
313811 6ELKO L286 50/50 2.53 MW 2.53 MW
926071 AC1-086 C Adder 32.98 MW 28.03 MW
926072 AC1-086 E Adder 15.01 MW 12.76 MW
933291 AC2-141 C Adder 54.34 MW 46.19 MW
933292 AC2-141 E Adder 23.2 MW 19.72 MW
939411 AE1-173 C Adder 145.74 MW 123.88 MW
939412 AE1-173 E Adder 97.16 MW 82.59 MW
934012 AD1-025 E Adder 17.79 MW 15.12 MW
927041 AC1-191 C Adder 16.39 MW 13.93 MW
927042 AC1-191 E Adder 8.16 MW 6.94 MW
933981 AD1-022 C Adder 14.55 MW 12.36 MW
933982 AD1-022 E Adder 7.92 MW 6.73 MW
961681 AG1-008 C Adder 23.18 MW 19.7 MW
961682 AG1-008 E Adder 11.71 MW 9.96 MW
313053 6PAPERMILL Adder 11.34 MW 9.64 MW
314594 6PLYMOUTH TP Adder 0.54 MW 0.46 MW
314632 6AYDLETT TAP Adder 2.37 MW 2.02 MW
316004 AC1-112 C 50/50 0.6 MW 0.6 MW
316159 AE1-175 C 50/50 0.71 MW 0.71 MW
316160 AE1-175 E 50/50 2.17 MW 2.17 MW
316169 AC1-164 GEN 50/50 73.88 MW 73.88 MW
316233 AE1-074 C Adder 4.09 MW 3.47 MW
316240 AF1-291 C Adder 3.78 MW 3.21 MW
316312 AB1-027 C 50/50 0.96 MW 0.96 MW
316382 AG1-145 C 50/50 0.64 MW 0.64 MW
917332 KELFORD E Adder 2.64 MW 2.24 MW
924516 AB2-100 E1 Adder 4.55 MW 3.87 MW
924517 AB2-100 E2 Adder 4.55 MW 3.87 MW
926785 AC1-164_E 50/50 33.19 MW 33.19 MW
934065 AD1-033 E Adder 8.83 MW 7.5 MW
937226 AE2-253 E Adder 10.25 MW 8.71 MW
939612 AE1-191 E Adder 9.62 MW 8.18 MW
918512 AA1-065 E OP Adder 9.05 MW 7.7 MW
919153 AA1-139 E2 Adder 7.16 MW 6.09 MW
919152 AA1-139 E1 Adder 7.16 MW 6.09 MW
920692 AA2-178 E Adder 6.94 MW 5.9 MW
924814 AB2-134 E Adder 22.51 MW 19.14 MW
316084 AB2-161 E Adder 9.6 MW 8.16 MW
925122 AB2-169 E Adder 9.35 MW 7.95 MW
316088 AB2-174 E Adder 10.15 MW 8.62 MW
932046 AC2-012 E Adder 23.16 MW 19.68 MW
316311 AC2-079 C Adder 9.98 MW 8.49 MW
932596 AC2-079 E Adder 16.29 MW 13.85 MW
934146 AD1-041 E Adder 6.01 MW 5.11 MW
934576 AD1-082 E Adder 7.65 MW 6.5 MW
316349 AD2-085 C Adder 5.99 MW 5.09 MW
936666 AD2-085 E Adder 9.78 MW 8.31 MW
961611 AG1-000B C Adder 28.34 MW 24.09 MW
941591 AE2-156 C Adder 31.64 MW 26.9 MW
944581 AF1-123 C Adder 80.21 MW 68.17 MW
944582 AF1-123 E Adder 183.66 MW 156.11 MW
944591 AF1-124 C Adder 80.49 MW 68.42 MW
944592 AF1-124 E Adder 184.33 MW 156.68 MW
944601 AF1-125 C Adder 78.97 MW 67.12 MW
944602 AF1-125 E Adder 180.78 MW 153.66 MW
944631 AF1-128 C 50/50 71.3 MW 71.3 MW
965281 AG1-393 C Adder 3.75 MW 3.19 MW
965282 AG1-393 E Adder 2.5 MW 2.13 MW
934501 AD1-074 C Adder 56.22 MW 47.78 MW
934502 AD1-074 E Adder 28.62 MW 24.32 MW
934511 AD1-075 C Adder 14.05 MW 11.95 MW
934512 AD1-075 E Adder 7.15 MW 6.08 MW
935161 AD1-151 C Adder 28.71 MW 24.41 MW
935162 AD1-151 E Adder 19.14 MW 16.27 MW
938531 AE1-072 C Adder 30.76 MW 26.15 MW
938532 AE1-072 E Adder 16.04 MW 13.63 MW
939191 AE1-149 C Adder 18.6 MW 15.81 MW
939192 AE1-149 E Adder 12.4 MW 10.54 MW
939602 AE1-190 E Adder 2.41 MW 2.04 MW
940431 AE2-027 C Adder 22.58 MW 19.19 MW
940432 AE2-027 E Adder 15.05 MW 12.79 MW
940481 AE2-033 C Adder 25.64 MW 21.8 MW
940482 AE2-033 E Adder 17.29 MW 14.69 MW
940541 AE2-040 C Adder 4.55 MW 3.87 MW
940551 AE2-041 C Adder 12.16 MW 10.33 MW
940641 AE2-051 C Adder 26.98 MW 22.93 MW
940642 AE2-051 E Adder 17.98 MW 15.29 MW
941101 AE2-104 C Adder 5.84 MW 4.97 MW
941102 AE2-104 E Adder 9.29 MW 7.89 MW
943471 AF1-018 C Adder 12.16 MW 10.33 MW
944641 AF1-129 C Adder 179.81 MW 152.84 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 84.3 MW 84.3 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 48.66 MW 48.66 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 156.73 MW 156.73 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 9.22 MW 9.22 MW
NY PJM->LTFIMP_NY CLTF 4.14 MW 4.14 MW
LGEE LTFEXP_LGEE->PJM CLTF 3.36 MW 3.36 MW
WEC LTFEXP_WEC->PJM CLTF 1.73 MW 1.73 MW
CPLE LTFEXP_CPLE->PJM CLTF 17.61 MW 17.61 MW
TVA LTFEXP_TVA->PJM CLTF 12.4 MW 12.4 MW
MEC LTFEXP_MEC->PJM CLTF 9.56 MW 9.56 MW
LAGN LTFEXP_LAGN->PJM CLTF 15.46 MW 15.46 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.62 MW 0.62 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 58.6 MW 58.6 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 8.41 MW 8.41 MW

Details for 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P4-2: H1T594_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
Contingency Name:
DVP_P4-2: H1T594_SRT-S
CONTINGENCY 'DVP_P4-2: H1T594_SRT-S'
 OPEN BRANCH FROM BUS 314063 TO BUS 314916 CKT 1                /*6MORRSVL     230.0 - 8MORRSVL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 OPEN BUS 314897                                                /*8MORRS_1     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 108.64 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4280.5 MVA
MW Contribution: 104.14 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C Adder 1.45 MW 1.23 MW
961792 AG1-021 E Adder 1.23 MW 1.05 MW
961941 AG1-037 C Adder 0.37 MW 0.32 MW
961942 AG1-037 E Adder 0.25 MW 0.21 MW
962331 AG1-082 C Adder 1.49 MW 1.27 MW
962332 AG1-082 E Adder 1.0 MW 0.85 MW
963041 AG1-153 C Adder 5.15 MW 4.38 MW
963042 AG1-153 E Adder 7.73 MW 6.57 MW
963171 AG1-166 C Adder 0.8 MW 0.68 MW
963172 AG1-166 E Adder 1.88 MW 1.59 MW
963181 AG1-167 C Adder 0.6 MW 0.51 MW
963182 AG1-167 E Adder 1.41 MW 1.2 MW
963191 AG1-168 C Adder 0.6 MW 0.51 MW
963192 AG1-168 E Adder 1.41 MW 1.2 MW
964791 AG1-342 C Adder 2.78 MW 2.37 MW
964792 AG1-342 E Adder 1.86 MW 1.58 MW
966801 AG1-551 C Adder 1.55 MW 1.32 MW
966802 AG1-551 E Adder 0.82 MW 0.69 MW
966811 AG1-552 C Adder 1.57 MW 1.34 MW
966812 AG1-552 E Adder 0.75 MW 0.64 MW
965291 AG1-394 C Adder 0.63 MW 0.54 MW
965292 AG1-394 E Adder 1.16 MW 0.99 MW
966621 AG1-532 C Adder 1.1 MW 0.93 MW
966622 AG1-532 E Adder 0.73 MW 0.62 MW
313853 3PONTONDP Adder 0.54 MW 0.46 MW
314541 3WATKINS Adder 0.5 MW 0.43 MW
314572 3EMPORIA Adder 0.34 MW 0.29 MW
314713 3PAMPLIN Adder 0.8 MW 0.68 MW
918492 AA1-063AE OP Adder 3.08 MW 2.62 MW
919692 AA2-053 E OP Adder 3.22 MW 2.73 MW
920042 AA2-088 E OP Adder 7.84 MW 6.67 MW
925785 AC1-054 E Adder 2.69 MW 2.28 MW
926274 AC1-105 E Adder 2.1 MW 1.78 MW
927146 AC1-208 E Adder 3.02 MW 2.57 MW
934521 AD1-076 C Adder 8.89 MW 7.55 MW
934522 AD1-076 E Adder 4.53 MW 3.85 MW
943172 AE2-346 E Adder 0.45 MW 0.38 MW
943902 AF1-058 E Adder 1.0 MW 0.85 MW
944011 AF1-069 C 50/50 12.16 MW 12.16 MW
944012 AF1-069 E 50/50 4.72 MW 4.72 MW
959311 AF2-222 C Adder 13.38 MW 11.38 MW
959312 AF2-222 E Adder 8.97 MW 7.62 MW
960061 AF2-297 C Adder 6.03 MW 5.12 MW
960062 AF2-297 E Adder 4.02 MW 3.42 MW
960081 AF2-299 C Adder 1.46 MW 1.24 MW
960082 AF2-299 E Adder 0.97 MW 0.83 MW
316141 AB2-099 E Adder 0.19 MW 0.16 MW
900672 V4-068 E Adder 0.26 MW 0.23 MW
923263 AB1-132 E OP Adder 4.67 MW 3.97 MW
923573 AB1-173 E OP Adder 2.54 MW 2.16 MW
924162 AB2-060 E OP Adder 3.42 MW 2.91 MW
924302 AB2-077 E O1 Adder 1.07 MW 0.91 MW
924312 AB2-078 E O1 Adder 1.07 MW 0.91 MW
924322 AB2-079 E O1 Adder 1.07 MW 0.91 MW
925612 AC1-036 E Adder 0.69 MW 0.59 MW
938371 AE1-056 C Adder 5.2 MW 4.42 MW
938372 AE1-056 E Adder 2.84 MW 2.42 MW
939181 AE1-148 C Adder 7.17 MW 6.1 MW
939182 AE1-148 E Adder 4.78 MW 4.07 MW
940492 AE2-034 E Adder 2.22 MW 1.89 MW
941031 AE2-094 C 50/50 37.21 MW 37.21 MW
941032 AE2-094 E 50/50 16.67 MW 16.67 MW
946281 AF1-292 C Adder 1.21 MW 1.03 MW
946282 AF1-292 E Adder 0.81 MW 0.69 MW
946301 AF1-294 C Adder 2.97 MW 2.53 MW
946302 AF1-294 E Adder 2.52 MW 2.14 MW
957481 AF2-042 C Adder 47.23 MW 40.15 MW
957482 AF2-042 E Adder 31.49 MW 26.77 MW
957521 AF2-046 C Adder 10.51 MW 8.93 MW
957522 AF2-046 E Adder 5.31 MW 4.51 MW
958211 AF2-115 C Adder 1.81 MW 1.54 MW
958212 AF2-115 E Adder 1.54 MW 1.31 MW
314539 3UNCAMP Adder 4.4 MW 3.74 MW
916042 Z1-036 E Adder 20.43 MW 17.37 MW
938771 AE1-103 C Adder 2.11 MW 1.79 MW
938772 AE1-103 E Adder 2.91 MW 2.48 MW
924032 AB2-045 E Adder 1.07 MW 0.91 MW
933502 AC2-165 E Adder 6.73 MW 5.72 MW
314331 6POE Adder 0.99 MW 0.84 MW
314507 3THOMPSN Adder 1.41 MW 1.2 MW
314525 6KINGFORK Adder 0.69 MW 0.58 MW
314550 6HICKORY Adder 1.53 MW 1.3 MW
926662 AC1-147 E Adder 0.92 MW 0.78 MW
926755 AC1-161 E Adder 9.01 MW 7.66 MW
934861 AD1-115 C 50/50 3.52 MW 3.52 MW
934862 AD1-115 E 50/50 5.75 MW 5.75 MW
935112 AD1-144 E Adder 0.64 MW 0.54 MW
942341 AE2-247 C Adder 1.04 MW 0.89 MW
942342 AE2-247 E Adder 1.44 MW 1.22 MW
943461 AF1-017 C Adder 0.94 MW 0.8 MW
943462 AF1-017 E Adder 1.54 MW 1.31 MW
943612 AF1-032 E Adder 0.65 MW 0.55 MW
958502 AF2-144 E Adder 1.12 MW 0.95 MW
315172 1LOISA A 50/50 3.44 MW 3.44 MW
315173 1LOISA B 50/50 3.45 MW 3.45 MW
315174 1LOISA C 50/50 3.45 MW 3.45 MW
315175 1LOISA D 50/50 3.45 MW 3.45 MW
315176 1LOISA E 50/50 7.04 MW 7.04 MW
315177 1S ANNAG1 50/50 3.36 MW 3.36 MW
315178 1S ANNAS1 50/50 1.73 MW 1.73 MW
315179 1S ANNAG2 50/50 3.36 MW 3.36 MW
315180 1S ANNAS2 50/50 1.73 MW 1.73 MW
315225 1N ANNA1 50/50 104.05 MW 104.05 MW
315226 1N ANNA2 50/50 104.08 MW 104.08 MW
315260 1GOSPORTA Adder 1.48 MW 1.26 MW
315261 1GOSPORTB Adder 1.89 MW 1.61 MW
315262 1GOSPORTC Adder 1.61 MW 1.37 MW
913392 Y1-086 E Adder 1.55 MW 1.32 MW
916192 Z1-068 E Adder 1.32 MW 1.12 MW
923832 AB2-022 E Adder 0.88 MW 0.74 MW
923852 AB2-025 E Adder 0.93 MW 0.79 MW
923862 AB2-026 E Adder 1.14 MW 0.97 MW
925022 AB2-158 E 50/50 11.64 MW 11.64 MW
938552 AE1-074 E Adder 1.04 MW 0.89 MW
938562 AE1-075 E Adder 0.97 MW 0.83 MW
957492 AF2-043 E Adder 1.0 MW 0.85 MW
966001 AG1-469 C 50/50 2.46 MW 2.46 MW
966002 AG1-469 E 50/50 1.23 MW 1.23 MW
901082 W1-029 E Adder 22.59 MW 19.2 MW
917122 Z2-027 E Adder 0.95 MW 0.81 MW
925522 AC1-027 E Adder 0.85 MW 0.72 MW
925672 AC1-043 E 50/50 11.49 MW 11.49 MW
957871 AF2-081 C Adder 7.03 MW 5.98 MW
957872 AF2-081 E Adder 3.01 MW 2.56 MW
958161 AF2-110 C Adder 0.96 MW 0.82 MW
958162 AF2-110 E Adder 1.53 MW 1.3 MW
314722 3TWITTYS Adder 0.76 MW 0.65 MW
926071 AC1-086 C Adder 16.04 MW 13.63 MW
926072 AC1-086 E Adder 7.3 MW 6.21 MW
936261 AD2-033 C Adder 10.43 MW 8.87 MW
936262 AD2-033 E Adder 6.96 MW 5.91 MW
933291 AC2-141 C Adder 21.12 MW 17.95 MW
933292 AC2-141 E Adder 9.01 MW 7.66 MW
934621 AD1-088 C Adder 10.96 MW 9.31 MW
934622 AD1-088 E Adder 5.16 MW 4.38 MW
939411 AE1-173 C Adder 78.34 MW 66.59 MW
939412 AE1-173 E Adder 52.23 MW 44.39 MW
933981 AD1-022 C Adder 6.38 MW 5.42 MW
933982 AD1-022 E Adder 3.47 MW 2.95 MW
962572 AG1-106 E Adder 0.91 MW 0.77 MW
961681 AG1-008 C Adder 10.51 MW 8.93 MW
961682 AG1-008 E Adder 5.31 MW 4.51 MW
962571 AG1-106 C Adder 2.07 MW 1.76 MW
208900 BRIS G1 50/50 -2.42 MW -2.42 MW
208901 BRIS G2 50/50 -2.86 MW -2.86 MW
314594 6PLYMOUTH TP Adder 0.23 MW 0.2 MW
314632 6AYDLETT TAP Adder 0.96 MW 0.81 MW
316164 AC1-076_C 50/50 1.11 MW 1.11 MW
316170 AC1-121 C 50/50 3.08 MW 3.08 MW
316192 AB2-158 C 50/50 4.38 MW 4.38 MW
316233 AE1-074 C Adder 2.08 MW 1.76 MW
316254 AC1-120 C 50/50 8.96 MW 8.96 MW
316257 AC1-043 C 50/50 7.04 MW 7.04 MW
316274 AC1-208 C Adder 6.8 MW 5.78 MW
316336 AC2-165 C Adder 8.94 MW 7.6 MW
917332 KELFORD E Adder 1.22 MW 1.04 MW
924516 AB2-100 E1 Adder 2.26 MW 1.92 MW
924517 AB2-100 E2 Adder 2.26 MW 1.92 MW
926206 AC1-098 E Adder 2.74 MW 2.33 MW
926214 AC1-099 E Adder 0.91 MW 0.77 MW
927255 AC1-221 E Adder 2.85 MW 2.42 MW
927264 AC1-222 E Adder 3.09 MW 2.62 MW
934065 AD1-033 E Adder 3.52 MW 2.99 MW
937226 AE2-253 E Adder 4.11 MW 3.49 MW
926004 AC1-076_E 50/50 6.37 MW 6.37 MW
926486 AC1-120 E 50/50 4.61 MW 4.61 MW
926502 AC1-121 E 50/50 1.45 MW 1.45 MW
918512 AA1-065 E OP Adder 4.06 MW 3.45 MW
919153 AA1-139 E2 Adder 2.88 MW 2.44 MW
919152 AA1-139 E1 Adder 2.88 MW 2.44 MW
919710 AA2-057 E Adder 2.98 MW 2.53 MW
920692 AA2-178 E Adder 2.96 MW 2.52 MW
923994 AB2-040_E Adder 4.76 MW 4.05 MW
924022 AB2-043 E O1 Adder 4.14 MW 3.52 MW
316084 AB2-161 E Adder 3.81 MW 3.24 MW
925122 AB2-169 E Adder 4.21 MW 3.58 MW
316088 AB2-174 E Adder 5.06 MW 4.3 MW
316044 AC1-158 C1 50/50 18.54 MW 18.54 MW
316045 AC1-158 C2 50/50 18.54 MW 18.54 MW
926739 AC1-158 E1 50/50 48.5 MW 48.5 MW
926740 AC1-158 E2 50/50 48.5 MW 48.5 MW
932046 AC2-012 E Adder 9.12 MW 7.76 MW
316311 AC2-079 C Adder 4.01 MW 3.41 MW
932596 AC2-079 E Adder 6.54 MW 5.56 MW
934576 AD1-082 E Adder 3.03 MW 2.58 MW
316349 AD2-085 C Adder 2.4 MW 2.04 MW
936666 AD2-085 E Adder 3.92 MW 3.33 MW
941591 AE2-156 C Adder 12.48 MW 10.6 MW
944581 AF1-123 C Adder 32.16 MW 27.33 MW
944582 AF1-123 E Adder 73.63 MW 62.59 MW
944591 AF1-124 C Adder 32.27 MW 27.43 MW
944592 AF1-124 E Adder 73.9 MW 62.81 MW
944601 AF1-125 C Adder 31.66 MW 26.91 MW
944602 AF1-125 E Adder 72.48 MW 61.61 MW
962491 AG1-098 C Adder 9.82 MW 8.34 MW
962492 AG1-098 E Adder 6.54 MW 5.56 MW
962561 AG1-105 C Adder 7.0 MW 5.95 MW
962562 AG1-105 E Adder 4.67 MW 3.97 MW
964241 AG1-285 C Adder 10.03 MW 8.52 MW
964242 AG1-285 E Adder 6.68 MW 5.68 MW
313764 3SOCKMAN Adder 0.55 MW 0.47 MW
932632 AC2-084 E Adder 2.42 MW 2.06 MW
934321 AD1-056 C Adder 4.72 MW 4.01 MW
934322 AD1-056 E Adder 2.56 MW 2.18 MW
934331 AD1-057 C Adder 2.63 MW 2.24 MW
934332 AD1-057 E Adder 1.37 MW 1.17 MW
934501 AD1-074 C Adder 24.47 MW 20.8 MW
934502 AD1-074 E Adder 12.45 MW 10.59 MW
934511 AD1-075 C Adder 6.12 MW 5.2 MW
934512 AD1-075 E Adder 3.11 MW 2.65 MW
934612 AD1-087 E Adder 3.1 MW 2.63 MW
935172 AD1-152 E Adder 4.55 MW 3.87 MW
937482 AD2-202 E Adder 0.91 MW 0.77 MW
938531 AE1-072 C Adder 12.38 MW 10.52 MW
938532 AE1-072 E Adder 6.45 MW 5.48 MW
939191 AE1-149 C Adder 7.32 MW 6.22 MW
939192 AE1-149 E Adder 4.88 MW 4.15 MW
940481 AE2-033 C Adder 12.95 MW 11.01 MW
940482 AE2-033 E Adder 8.73 MW 7.42 MW
940541 AE2-040 C Adder 2.31 MW 1.96 MW
940641 AE2-051 C 50/50 15.8 MW 15.8 MW
940642 AE2-051 E 50/50 10.54 MW 10.54 MW
941101 AE2-104 C Adder 2.36 MW 2.01 MW
941102 AE2-104 E Adder 3.76 MW 3.19 MW
942461 AE2-259 C Adder 8.05 MW 6.84 MW
942462 AE2-259 E Adder 5.37 MW 4.56 MW
316303 AF2-085 50/50 3.89 MW 3.89 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 19.0 MW 19.0 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.09 MW 16.09 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 73.98 MW 73.98 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.92 MW 4.92 MW
NY PJM->LTFIMP_NY CLTF 2.31 MW 2.31 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.83 MW 0.83 MW
WEC LTFEXP_WEC->PJM CLTF 0.41 MW 0.41 MW
CPLE LTFEXP_CPLE->PJM CLTF 8.88 MW 8.88 MW
TVA LTFEXP_TVA->PJM CLTF 4.52 MW 4.52 MW
MEC LTFEXP_MEC->PJM CLTF 2.65 MW 2.65 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.7 MW 5.7 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.16 MW 0.16 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 31.31 MW 31.31 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.23 MW 4.23 MW

Details for 8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line l/o DVP_P4-2: 545T552_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line
314911 to 314922 ckt 1
Contingency Name:
DVP_P4-2: 545T552_SRT-S
CONTINGENCY 'DVP_P4-2: 545T552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314916 CKT 1                /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314934 CKT 1 /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314934 CKT 1 /*8MORRSVL     500.0 - 8SPOTSYL     500.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 108.29 %
Rating: 3940.0 MVA
Rating Type: C
MVA to Mitigate: 4266.74 MVA
MW Contribution: 134.28 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C Adder 4.49 MW 3.81 MW
963042 AG1-153 E Adder 6.73 MW 5.72 MW
965291 AG1-394 C Adder 0.74 MW 0.63 MW
965292 AG1-394 E Adder 1.36 MW 1.16 MW
314541 3WATKINS Adder 0.61 MW 0.52 MW
920042 AA2-088 E OP Adder 9.23 MW 7.84 MW
934521 AD1-076 C Adder 10.74 MW 9.13 MW
934522 AD1-076 E Adder 5.47 MW 4.65 MW
944011 AF1-069 C Adder 10.44 MW 8.88 MW
944012 AF1-069 E Adder 4.06 MW 3.45 MW
900672 V4-068 E Adder 0.31 MW 0.26 MW
940492 AE2-034 E Adder 2.73 MW 2.32 MW
941031 AE2-094 C Adder 31.96 MW 27.16 MW
941032 AE2-094 E Adder 14.31 MW 12.17 MW
957521 AF2-046 C Adder 7.22 MW 6.14 MW
314539 3UNCAMP Adder 5.4 MW 4.59 MW
916042 Z1-036 E Adder 25.54 MW 21.71 MW
938771 AE1-103 C Adder 2.61 MW 2.22 MW
938772 AE1-103 E Adder 3.6 MW 3.06 MW
314229 6MT RD221 50/50 0.12 MW 0.12 MW
314236 6NRTHEST 50/50 0.18 MW 0.18 MW
314331 6POE Adder 1.23 MW 1.05 MW
314507 3THOMPSN Adder 1.85 MW 1.57 MW
314525 6KINGFORK Adder 0.93 MW 0.79 MW
314550 6HICKORY Adder 1.98 MW 1.69 MW
315060 1CHESTF5 Adder 59.74 MW 50.78 MW
315065 1CHESTF6 Adder 18.4 MW 15.64 MW
315067 1DARBY 1 50/50 2.42 MW 2.42 MW
315068 1DARBY 2 50/50 2.43 MW 2.43 MW
315069 1DARBY 3 50/50 2.44 MW 2.44 MW
315070 1DARBY 4 50/50 2.44 MW 2.44 MW
315073 1STONECA Adder 6.47 MW 5.5 MW
315083 1SPRUNCA Adder 8.53 MW 7.25 MW
315084 1SPRUNCB Adder 8.53 MW 7.25 MW
315092 1YORKTN3 Adder 122.85 MW 104.42 MW
925865 AC1-065 E Adder 14.9 MW 12.66 MW
926412 AC1-112 E 50/50 1.07 MW 1.07 MW
926662 AC1-147 E Adder 1.21 MW 1.03 MW
926755 AC1-161 E Adder 11.9 MW 10.12 MW
927226 AC1-216 E Adder 7.19 MW 6.12 MW
934392 AD1-063 E Adder 0.96 MW 0.82 MW
935112 AD1-144 E Adder 0.86 MW 0.73 MW
942341 AE2-247 C Adder 1.36 MW 1.16 MW
942342 AE2-247 E Adder 1.88 MW 1.59 MW
943461 AF1-017 C Adder 1.23 MW 1.04 MW
943462 AF1-017 E Adder 2.01 MW 1.71 MW
943612 AF1-032 E Adder 0.84 MW 0.71 MW
958502 AF2-144 E Adder 1.01 MW 0.86 MW
966871 AG1-558 C Adder 2.25 MW 1.91 MW
966872 AG1-558 E Adder 1.13 MW 0.96 MW
966881 AG1-559 C 50/50 2.29 MW 2.29 MW
966882 AG1-559 E 50/50 1.16 MW 1.16 MW
315225 1N ANNA1 50/50 28.62 MW 28.62 MW
315226 1N ANNA2 50/50 28.62 MW 28.62 MW
315260 1GOSPORTA Adder 1.95 MW 1.66 MW
315261 1GOSPORTB Adder 2.49 MW 2.12 MW
315262 1GOSPORTC Adder 2.11 MW 1.79 MW
316075 AC2-137 C 50/50 0.36 MW 0.36 MW
316076 AC2-137 E 50/50 1.26 MW 1.26 MW
316157 AD2-030 E Adder 1.06 MW 0.9 MW
913392 Y1-086 E Adder 1.99 MW 1.69 MW
916192 Z1-068 E Adder 1.72 MW 1.46 MW
923832 AB2-022 E Adder 1.12 MW 0.95 MW
923842 AB2-024 E Adder 1.61 MW 1.37 MW
923852 AB2-025 E Adder 0.99 MW 0.84 MW
923862 AB2-026 E Adder 1.03 MW 0.88 MW
930122 AB1-027 E 50/50 1.32 MW 1.32 MW
938552 AE1-074 E Adder 1.13 MW 0.96 MW
938562 AE1-075 E Adder 0.88 MW 0.75 MW
939312 AE1-162 E Adder 1.32 MW 1.12 MW
946262 AF1-291 E Adder 1.34 MW 1.14 MW
957411 AF2-035 C 50/50 8.28 MW 8.28 MW
957412 AF2-035 E 50/50 4.14 MW 4.14 MW
957492 AF2-043 E Adder 1.29 MW 1.1 MW
957601 AF2-054 C Adder 1.88 MW 1.6 MW
957602 AF2-054 E Adder 1.26 MW 1.07 MW
962962 AG1-145 E Adder 1.35 MW 1.15 MW
962971 AG1-146 C Adder 2.67 MW 2.27 MW
962972 AG1-146 E Adder 1.78 MW 1.51 MW
962981 AG1-147 C Adder 6.22 MW 5.29 MW
962982 AG1-147 E Adder 4.15 MW 3.53 MW
963051 AG1-154 C Adder 3.36 MW 2.85 MW
963052 AG1-154 E Adder 5.04 MW 4.28 MW
901082 W1-029 E Adder 28.75 MW 24.44 MW
917122 Z2-027 E Adder 1.21 MW 1.03 MW
925332 AB2-190 E Adder 7.54 MW 6.41 MW
925522 AC1-027 E Adder 1.11 MW 0.94 MW
942001 AE2-212 C Adder 2.0 MW 1.7 MW
942002 AE2-212 E Adder 1.33 MW 1.13 MW
957832 AF2-077 E Adder 1.3 MW 1.1 MW
957871 AF2-081 C Adder 9.08 MW 7.71 MW
957872 AF2-081 E Adder 3.89 MW 3.31 MW
958161 AF2-110 C Adder 1.24 MW 1.05 MW
958162 AF2-110 E Adder 1.98 MW 1.68 MW
313811 6ELKO L286 50/50 1.31 MW 1.31 MW
933291 AC2-141 C Adder 27.88 MW 23.7 MW
933292 AC2-141 E Adder 11.9 MW 10.12 MW
939411 AE1-173 C Adder 77.13 MW 65.56 MW
939412 AE1-173 E Adder 51.42 MW 43.7 MW
934012 AD1-025 E Adder 9.31 MW 7.92 MW
927041 AC1-191 C Adder 9.02 MW 7.67 MW
927042 AC1-191 E Adder 4.49 MW 3.82 MW
933981 AD1-022 C Adder 7.66 MW 6.51 MW
933982 AD1-022 E Adder 4.17 MW 3.54 MW
961681 AG1-008 C Adder 12.27 MW 10.43 MW
313053 6PAPERMILL Adder 5.96 MW 5.06 MW
314594 6PLYMOUTH TP Adder 0.28 MW 0.24 MW
314632 6AYDLETT TAP Adder 1.23 MW 1.05 MW
316004 AC1-112 C 50/50 0.31 MW 0.31 MW
316160 AE1-175 E Adder 1.11 MW 0.94 MW
316169 AC1-164 GEN Adder 37.88 MW 32.2 MW
316233 AE1-074 C Adder 2.25 MW 1.91 MW
316240 AF1-291 C Adder 2.02 MW 1.72 MW
316312 AB1-027 C 50/50 0.5 MW 0.5 MW
924516 AB2-100 E1 Adder 2.44 MW 2.07 MW
924517 AB2-100 E2 Adder 2.44 MW 2.07 MW
926785 AC1-164_E Adder 17.02 MW 14.47 MW
934065 AD1-033 E Adder 4.57 MW 3.88 MW
937226 AE2-253 E Adder 5.31 MW 4.51 MW
939612 AE1-191 E Adder 5.08 MW 4.32 MW
315051 AA1-145 CT1 50/50 4.79 MW 4.79 MW
315052 AA1-145 CT2 50/50 4.78 MW 4.78 MW
919153 AA1-139 E2 Adder 3.71 MW 3.15 MW
919152 AA1-139 E1 Adder 3.71 MW 3.15 MW
920692 AA2-178 E Adder 3.64 MW 3.09 MW
924814 AB2-134 E Adder 11.78 MW 10.02 MW
316084 AB2-161 E Adder 5.06 MW 4.3 MW
932046 AC2-012 E Adder 11.99 MW 10.19 MW
316311 AC2-079 C Adder 5.22 MW 4.44 MW
932596 AC2-079 E Adder 8.52 MW 7.24 MW
934146 AD1-041 E Adder 3.18 MW 2.7 MW
934576 AD1-082 E Adder 4.03 MW 3.43 MW
316349 AD2-085 C Adder 3.14 MW 2.67 MW
936666 AD2-085 E Adder 5.12 MW 4.35 MW
961611 AG1-000B C Adder 14.77 MW 12.55 MW
941591 AE2-156 C Adder 16.38 MW 13.92 MW
944581 AF1-123 C Adder 41.46 MW 35.24 MW
944582 AF1-123 E Adder 94.95 MW 80.7 MW
944591 AF1-124 C Adder 41.61 MW 35.37 MW
944592 AF1-124 E Adder 95.29 MW 81.0 MW
944601 AF1-125 C Adder 40.82 MW 34.7 MW
944602 AF1-125 E Adder 93.46 MW 79.44 MW
944631 AF1-128 C Adder 37.38 MW 31.77 MW
965281 AG1-393 C Adder 2.0 MW 1.7 MW
965282 AG1-393 E Adder 1.33 MW 1.13 MW
934501 AD1-074 C Adder 29.56 MW 25.13 MW
934502 AD1-074 E Adder 15.05 MW 12.79 MW
934511 AD1-075 C Adder 7.39 MW 6.28 MW
934512 AD1-075 E Adder 3.76 MW 3.2 MW
935161 AD1-151 C Adder 15.05 MW 12.79 MW
935162 AD1-151 E Adder 10.04 MW 8.53 MW
938531 AE1-072 C Adder 15.95 MW 13.56 MW
938532 AE1-072 E Adder 8.31 MW 7.07 MW
939191 AE1-149 C Adder 9.86 MW 8.38 MW
939192 AE1-149 E Adder 6.57 MW 5.59 MW
939261 AE1-157 C Adder 13.29 MW 11.3 MW
939262 AE1-157 E Adder 7.21 MW 6.13 MW
939602 AE1-190 E Adder 1.27 MW 1.08 MW
940431 AE2-027 C Adder 12.03 MW 10.23 MW
940432 AE2-027 E Adder 8.02 MW 6.82 MW
940481 AE2-033 C Adder 13.75 MW 11.68 MW
940482 AE2-033 E Adder 9.27 MW 7.88 MW
940541 AE2-040 C Adder 2.44 MW 2.08 MW
940551 AE2-041 C Adder 6.4 MW 5.44 MW
940641 AE2-051 C Adder 14.39 MW 12.23 MW
940642 AE2-051 E Adder 9.59 MW 8.15 MW
941101 AE2-104 C Adder 3.04 MW 2.59 MW
941102 AE2-104 E Adder 4.84 MW 4.11 MW
943471 AF1-018 C Adder 6.4 MW 5.44 MW
944641 AF1-129 C Adder 95.94 MW 81.55 MW
315043 1FOUR RIVERA 50/50 3.0 MW 3.0 MW
315044 1FOUR RIVERB 50/50 3.0 MW 3.0 MW
315045 1FOUR RIVERC 50/50 3.67 MW 3.67 MW
315046 1FOUR RIVERD 50/50 2.96 MW 2.96 MW
315047 1FOUR RIVERE 50/50 2.96 MW 2.96 MW
315048 1FOUR RIVERF 50/50 3.61 MW 3.61 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 51.33 MW 51.33 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 28.44 MW 28.44 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 86.85 MW 86.85 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 7.06 MW 7.06 MW
NY PJM->LTFIMP_NY CLTF 3.11 MW 3.11 MW
LGEE LTFEXP_LGEE->PJM CLTF 2.02 MW 2.02 MW
WEC LTFEXP_WEC->PJM CLTF 1.05 MW 1.05 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.65 MW 9.65 MW
TVA LTFEXP_TVA->PJM CLTF 7.14 MW 7.14 MW
MEC LTFEXP_MEC->PJM CLTF 5.71 MW 5.71 MW
LAGN LTFEXP_LAGN->PJM CLTF 8.9 MW 8.9 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.37 MW 0.37 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 44.8 MW 44.8 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.61 MW 4.61 MW

Details for 8OX-8CLIFTON 500.0 kV Ckt 1 line l/o DVP_P7-1: LN 2101-569_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8OX-8CLIFTON 500.0 kV Ckt 1 line
314919 to 314904 ckt 1
Contingency Name:
DVP_P7-1: LN 2101-569_SRT-S
CONTINGENCY 'DVP_P7-1: LN 2101-569_SRT-S'
 OPEN BRANCH FROM BUS 313712 TO BUS 313716 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL DP  230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314119 CKT 1                /*6VINTHIL TP  230.0 - 6NOKESVL     230.0
 OPEN BRANCH FROM BUS 313712 TO BUS 314125 CKT 1                /*6VINTHIL TP  230.0 - 6VINTHIL     230.0
 OPEN BRANCH FROM BUS 314119 TO BUS 314130 CKT 1                /*6NOKESVL     230.0 - 6BRISTER     230.0
 OPEN BRANCH FROM BUS 314913 TO BUS 314916 CKT 1                /*8LOUDOUN     500.0 - 8MORRSVL     500.0
 OPEN BUS 313712                                                /*6VINTHIL TP  230.0
 OPEN BUS 313716                                                /*6VINTHIL DP  230.0
 OPEN BUS 314119                                                /*6NOKESVL     230.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314916 TO BUS 314929 CKT 1 /*8MORRSVL     500.0 - 8FRONT ROYAL 500.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 105.67 %
Rating: 3144.0 MVA
Rating Type: C
MVA to Mitigate: 3322.12 MVA
MW Contribution: 96.01 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314331 6POE Adder 0.89 MW 0.76 MW
314507 3THOMPSN Adder 1.32 MW 1.12 MW
314525 6KINGFORK Adder 0.67 MW 0.57 MW
314550 6HICKORY Adder 1.42 MW 1.21 MW
315007 1POSSM 5 Adder 93.74 MW 79.68 MW
315008 1POSSM6A 50/50 3.71 MW 3.71 MW
315009 1POSSM6B 50/50 3.71 MW 3.71 MW
315010 1POSSM6S 50/50 5.78 MW 5.78 MW
315018 1POSSMC2 50/50 0.82 MW 0.82 MW
315033 1BIRCHWDA Adder 28.44 MW 24.18 MW
315039 1LDYSMT3 50/50 3.92 MW 3.92 MW
315040 1LDYSMT4 50/50 3.93 MW 3.93 MW
315041 1LDYSMT5 50/50 3.94 MW 3.94 MW
315060 1CHESTF5 Adder 43.4 MW 36.89 MW
315065 1CHESTF6 Adder 13.28 MW 11.29 MW
315073 1STONECA Adder 4.68 MW 3.98 MW
315083 1SPRUNCA Adder 6.19 MW 5.26 MW
315084 1SPRUNCB Adder 6.19 MW 5.26 MW
315092 1YORKTN3 Adder 89.33 MW 75.93 MW
925865 AC1-065 E Adder 11.66 MW 9.91 MW
926412 AC1-112 E Adder 0.78 MW 0.66 MW
926472 AC1-118 E Adder 0.89 MW 0.76 MW
926662 AC1-147 E Adder 0.87 MW 0.74 MW
926755 AC1-161 E Adder 8.49 MW 7.22 MW
927226 AC1-216 E Adder 5.19 MW 4.41 MW
934392 AD1-063 E Adder 0.75 MW 0.64 MW
934782 AD1-105 E Adder 3.92 MW 3.33 MW
935112 AD1-144 E Adder 0.62 MW 0.53 MW
936582 AD2-073 E Adder 0.86 MW 0.73 MW
936591 AD2-074 C Adder 4.14 MW 3.52 MW
936592 AD2-074 E Adder 6.75 MW 5.74 MW
942341 AE2-247 C Adder 0.97 MW 0.83 MW
942342 AE2-247 E Adder 1.34 MW 1.14 MW
943461 AF1-017 C Adder 0.88 MW 0.75 MW
943462 AF1-017 E Adder 1.44 MW 1.22 MW
943612 AF1-032 E Adder 0.6 MW 0.51 MW
943741 AF1-042 C Adder 2.17 MW 1.84 MW
943742 AF1-042 E Adder 3.53 MW 3.0 MW
944491 AF1-114 C Adder 5.64 MW 4.79 MW
944492 AF1-114 E Adder 7.78 MW 6.62 MW
961951 AG1-038 C Adder 2.39 MW 2.03 MW
961952 AG1-038 E Adder 3.3 MW 2.81 MW
966661 AG1-536 C Adder 4.07 MW 3.46 MW
966662 AG1-536 E Adder 5.47 MW 4.65 MW
966871 AG1-558 C Adder 1.71 MW 1.46 MW
966872 AG1-558 E Adder 0.86 MW 0.73 MW
966881 AG1-559 C 50/50 1.9 MW 1.9 MW
966882 AG1-559 E 50/50 0.96 MW 0.96 MW
315225 1N ANNA1 50/50 23.22 MW 23.22 MW
315226 1N ANNA2 50/50 23.23 MW 23.23 MW
315260 1GOSPORTA Adder 1.39 MW 1.19 MW
315261 1GOSPORTB Adder 1.78 MW 1.51 MW
315262 1GOSPORTC Adder 1.51 MW 1.28 MW
316076 AC2-137 E Adder 0.92 MW 0.78 MW
316078 AC2-138 E Adder 0.72 MW 0.61 MW
316157 AD2-030 E Adder 0.84 MW 0.71 MW
916192 Z1-068 E Adder 1.23 MW 1.04 MW
923842 AB2-024 E Adder 1.25 MW 1.06 MW
925022 AB2-158 E Adder 3.34 MW 2.84 MW
930122 AB1-027 E Adder 0.95 MW 0.81 MW
938552 AE1-074 E Adder 0.83 MW 0.7 MW
939312 AE1-162 E Adder 0.95 MW 0.81 MW
946262 AF1-291 E Adder 0.97 MW 0.82 MW
957411 AF2-035 C 50/50 6.87 MW 6.87 MW
957412 AF2-035 E 50/50 3.43 MW 3.43 MW
957492 AF2-043 E Adder 0.92 MW 0.79 MW
957601 AF2-054 C Adder 1.49 MW 1.27 MW
957602 AF2-054 E Adder 0.99 MW 0.84 MW
962861 AG1-135 C Adder 4.57 MW 3.89 MW
962862 AG1-135 E Adder 3.05 MW 2.59 MW
962962 AG1-145 E Adder 0.98 MW 0.83 MW
962971 AG1-146 C Adder 2.27 MW 1.93 MW
962972 AG1-146 E Adder 1.52 MW 1.29 MW
962981 AG1-147 C Adder 5.31 MW 4.51 MW
962982 AG1-147 E Adder 3.54 MW 3.01 MW
963051 AG1-154 C 50/50 3.01 MW 3.01 MW
963052 AG1-154 E 50/50 4.52 MW 4.52 MW
963611 AG1-210 C Adder 0.51 MW 0.44 MW
963612 AG1-210 E Adder 0.77 MW 0.65 MW
964211 AG1-282 C Adder 1.53 MW 1.3 MW
964212 AG1-282 E Adder 1.02 MW 0.87 MW
925332 AB2-190 E Adder 5.45 MW 4.63 MW
925522 AC1-027 E Adder 0.8 MW 0.68 MW
942001 AE2-212 C Adder 1.44 MW 1.23 MW
942002 AE2-212 E Adder 0.96 MW 0.82 MW
957832 AF2-077 E Adder 0.98 MW 0.83 MW
957871 AF2-081 C Adder 6.48 MW 5.51 MW
957872 AF2-081 E Adder 2.78 MW 2.36 MW
957971 AF2-091 C Adder 1.92 MW 1.63 MW
957972 AF2-091 E Adder 2.65 MW 2.25 MW
313811 6ELKO L286 Adder 0.96 MW 0.81 MW
314181 3NORNECK Adder 0.68 MW 0.58 MW
933291 AC2-141 C Adder 19.9 MW 16.91 MW
933292 AC2-141 E Adder 8.49 MW 7.22 MW
939411 AE1-173 C Adder 55.53 MW 47.2 MW
939412 AE1-173 E Adder 37.02 MW 31.46 MW
934012 AD1-025 E Adder 6.72 MW 5.71 MW
927041 AC1-191 C Adder 6.88 MW 5.85 MW
927042 AC1-191 E Adder 3.43 MW 2.92 MW
313053 6PAPERMILL Adder 4.63 MW 3.94 MW
314632 6AYDLETT TAP Adder 0.88 MW 0.75 MW
316160 AE1-175 E Adder 0.81 MW 0.69 MW
316169 AC1-164 GEN Adder 27.66 MW 23.52 MW
316170 AC1-121 C Adder 1.59 MW 1.35 MW
316233 AE1-074 C Adder 1.64 MW 1.4 MW
316240 AF1-291 C Adder 1.46 MW 1.24 MW
316254 AC1-120 C Adder 4.62 MW 3.93 MW
926785 AC1-164_E Adder 12.43 MW 10.56 MW
934065 AD1-033 E Adder 3.27 MW 2.78 MW
937226 AE2-253 E Adder 3.8 MW 3.23 MW
939612 AE1-191 E Adder 4.0 MW 3.4 MW
926004 AC1-076_E Adder 2.94 MW 2.5 MW
926486 AC1-120 E Adder 2.38 MW 2.02 MW
926502 AC1-121 E Adder 0.75 MW 0.64 MW
315037 1LDYSMT1 50/50 3.77 MW 3.77 MW
315038 1LDYSMT2 50/50 3.82 MW 3.82 MW
316411 AF1-147_GEN1 Adder -5.71 MW -4.85 MW
316415 AF1-147_GEN2 Adder -5.71 MW -4.85 MW
939246 AE1-155 E Adder 6.59 MW 5.6 MW
919153 AA1-139 E2 Adder 2.65 MW 2.25 MW
919152 AA1-139 E1 Adder 2.65 MW 2.25 MW
924814 AB2-134 E Adder 8.51 MW 7.23 MW
316084 AB2-161 E Adder 3.64 MW 3.09 MW
316044 AC1-158 C1 50/50 4.24 MW 4.24 MW
316045 AC1-158 C2 50/50 4.24 MW 4.24 MW
926739 AC1-158 E1 50/50 11.09 MW 11.09 MW
926740 AC1-158 E2 50/50 11.09 MW 11.09 MW
932046 AC2-012 E Adder 8.58 MW 7.29 MW
316311 AC2-079 C Adder 3.74 MW 3.18 MW
932596 AC2-079 E Adder 6.1 MW 5.19 MW
934146 AD1-041 E Adder 2.5 MW 2.12 MW
934576 AD1-082 E Adder 2.9 MW 2.46 MW
316349 AD2-085 C Adder 2.25 MW 1.91 MW
936666 AD2-085 E Adder 3.67 MW 3.12 MW
961611 AG1-000B C Adder 10.65 MW 9.05 MW
941591 AE2-156 C Adder 11.72 MW 9.96 MW
944581 AF1-123 C Adder 29.65 MW 25.2 MW
944582 AF1-123 E Adder 67.89 MW 57.7 MW
944591 AF1-124 C Adder 29.75 MW 25.29 MW
944592 AF1-124 E Adder 68.13 MW 57.91 MW
944601 AF1-125 C Adder 29.19 MW 24.81 MW
944602 AF1-125 E Adder 66.82 MW 56.8 MW
944631 AF1-128 C Adder 27.16 MW 23.09 MW
958261 AF2-120 C Adder 4.73 MW 4.02 MW
958262 AF2-120 E Adder 3.15 MW 2.68 MW
965281 AG1-393 C Adder 1.45 MW 1.23 MW
965282 AG1-393 E Adder 0.97 MW 0.82 MW
935161 AD1-151 C Adder 10.87 MW 9.24 MW
935162 AD1-151 E Adder 7.25 MW 6.16 MW
938531 AE1-072 C Adder 11.39 MW 9.68 MW
938532 AE1-072 E Adder 5.94 MW 5.05 MW
939191 AE1-149 C Adder 7.11 MW 6.04 MW
939192 AE1-149 E Adder 4.74 MW 4.03 MW
939261 AE1-157 C 50/50 11.35 MW 11.35 MW
939262 AE1-157 E 50/50 6.16 MW 6.16 MW
939602 AE1-190 E Adder 1.0 MW 0.85 MW
940431 AE2-027 C Adder 8.73 MW 7.42 MW
940432 AE2-027 E Adder 5.82 MW 4.94 MW
940551 AE2-041 C Adder 5.0 MW 4.25 MW
940641 AE2-051 C Adder 10.38 MW 8.82 MW
940642 AE2-051 E Adder 0.7 MW 0.6 MW
943471 AF1-018 C Adder 5.0 MW 4.25 MW
944641 AF1-129 C Adder 69.28 MW 58.88 MW
957191 AF2-013 C Adder 13.77 MW 11.7 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 9.03 MW 9.03 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.51 MW 10.51 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 52.11 MW 52.11 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.97 MW 3.97 MW
NY PJM->LTFIMP_NY CLTF 1.96 MW 1.96 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.48 MW 0.48 MW
WEC LTFEXP_WEC->PJM CLTF 0.21 MW 0.21 MW
CPLE LTFEXP_CPLE->PJM CLTF 6.21 MW 6.21 MW
TVA LTFEXP_TVA->PJM CLTF 3.12 MW 3.12 MW
MEC LTFEXP_MEC->PJM CLTF 1.56 MW 1.56 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.88 MW 3.88 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.1 MW 0.1 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 25.38 MW 25.38 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.96 MW 2.96 MW

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
OP AC 105.67 % 3220.44 B 3403.15 137.48
DVP 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 116.33 % 4070.2 B 4735.04 246.75
DVP 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer
314218 to 314908 ckt 2
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 109.7 % 879.84 B 965.14 78.42
DVP 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
OP AC 132.32 % 1058.16 B 1400.18 60.98
DVP 6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer
314214 to 314903 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 123.73 % 934.92 B 1156.78 87.75
DVP 6CHESTF A-6IRON208 230.0 kV Ckt 1 line
314286 to 314309 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 122.25 % 663.64 B 811.33 47.22
DVP 6NRTHEST-6ELMONT 230.0 kV Ckt 1 line
314236 to 314218 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 122.86 % 678.68 B 833.8 63.22
DVP 8SEPTA-8SURRY 500.0 kV Ckt 1 line
314923 to 314924 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 110.23 % 2442.12 B 2691.94 146.39
DVP 6IRON208-6SOUWEST 230.0 kV Ckt 1 line
314309 to 314338 ckt 1
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 113.21 % 663.64 B 751.33 47.15
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Base Case OP AC 105.73 % 3220.44 A 3404.98 165.05
DVP 6LIGH209-6LANEXA 230.0 kV Ckt 1 line
314391 to 314388 ckt 1
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
OP AC 100.35 % 663.64 B 665.95 74.21
DVP 6CHESTF B-6VARINA 230.0 kV Ckt 1 line
314287 to 314260 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 107.46 % 984.18 B 1057.62 48.41
DVP 6VARINA-6CHARCTY 230.0 kV Ckt 1 line
314260 to 314225 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 107.41 % 984.18 B 1057.1 48.41
DVP 6CHARCTY-6LAKESIDE 230.0 kV Ckt 1 line
314225 to 314227 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 103.84 % 984.18 B 1021.97 48.41
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Base Case OP AC 120.45 % 678.68 A 817.5 161.24
DVP 8LADYSMITH-8KRAKEN 500.0 kV Ckt 1 line
314911 to 313483 ckt 1
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
OP AC 114.52 % 3220.44 B 3688.11 157.9

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 552_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
Contingency Name:
DVP_P1-2: LN 552_SRT-S
CONTINGENCY 'DVP_P1-2: LN 552_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 1                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314900 TO BUS 314905 CKT 1                /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 105.67 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3403.15 MVA
MW Contribution: 137.48 MW
Impact of Topology Modeling:
Decrease
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C Adder 4.86 MW 4.13 MW
963042 AG1-153 E Adder 7.3 MW 6.2 MW
965291 AG1-394 C Adder 0.76 MW 0.64 MW
965292 AG1-394 E Adder 1.4 MW 1.19 MW
314541 3WATKINS Adder 0.62 MW 0.53 MW
920042 AA2-088 E OP Adder 9.44 MW 8.02 MW
934521 AD1-076 C Adder 10.84 MW 9.21 MW
944011 AF1-069 C Adder 11.37 MW 9.66 MW
944012 AF1-069 E Adder 4.42 MW 3.75 MW
940492 AE2-034 E Adder 2.76 MW 2.35 MW
941031 AE2-094 C Adder 34.79 MW 29.57 MW
941032 AE2-094 E Adder 15.58 MW 13.24 MW
314539 3UNCAMP Adder 5.53 MW 4.7 MW
916042 Z1-036 E Adder 25.99 MW 22.09 MW
938771 AE1-103 C Adder 2.67 MW 2.27 MW
938772 AE1-103 E Adder 3.69 MW 3.14 MW
314331 6POE Adder 1.28 MW 1.09 MW
314507 3THOMPSN Adder 1.89 MW 1.61 MW
314525 6KINGFORK Adder 0.95 MW 0.81 MW
314550 6HICKORY Adder 2.04 MW 1.73 MW
315060 1CHESTF5 Adder 59.36 MW 50.46 MW
315065 1CHESTF6 Adder 18.62 MW 15.83 MW
315073 1STONECA Adder 6.51 MW 5.54 MW
315083 1SPRUNCA 50/50 8.77 MW 8.77 MW
315084 1SPRUNCB 50/50 8.77 MW 8.77 MW
315092 1YORKTN3 Adder 123.4 MW 104.89 MW
925865 AC1-065 E Adder 15.05 MW 12.79 MW
926412 AC1-112 E Adder 1.03 MW 0.88 MW
926662 AC1-147 E Adder 1.24 MW 1.06 MW
926755 AC1-161 E Adder 12.18 MW 10.36 MW
927226 AC1-216 E Adder 7.27 MW 6.18 MW
934392 AD1-063 E Adder 0.97 MW 0.82 MW
935112 AD1-144 E Adder 0.88 MW 0.75 MW
936591 AD2-074 C Adder 4.96 MW 4.22 MW
936592 AD2-074 E Adder 8.1 MW 6.88 MW
942341 AE2-247 C Adder 1.39 MW 1.18 MW
942342 AE2-247 E Adder 1.92 MW 1.64 MW
943461 AF1-017 C Adder 1.26 MW 1.07 MW
943462 AF1-017 E Adder 2.06 MW 1.75 MW
943612 AF1-032 E Adder 0.86 MW 0.73 MW
943741 AF1-042 C Adder 2.6 MW 2.21 MW
943742 AF1-042 E Adder 4.24 MW 3.6 MW
958502 AF2-144 E Adder 1.07 MW 0.91 MW
961951 AG1-038 C Adder 2.87 MW 2.44 MW
961952 AG1-038 E Adder 3.96 MW 3.37 MW
966871 AG1-558 C Adder 2.19 MW 1.86 MW
966872 AG1-558 E Adder 1.1 MW 0.94 MW
966881 AG1-559 C Adder 2.14 MW 1.82 MW
966882 AG1-559 E Adder 1.08 MW 0.92 MW
315225 1N ANNA1 50/50 47.2 MW 47.2 MW
315226 1N ANNA2 50/50 47.22 MW 47.22 MW
315260 1GOSPORTA Adder 2.0 MW 1.7 MW
315261 1GOSPORTB Adder 2.55 MW 2.17 MW
315262 1GOSPORTC Adder 2.16 MW 1.84 MW
316076 AC2-137 E Adder 1.23 MW 1.05 MW
316157 AD2-030 E Adder 1.07 MW 0.91 MW
913392 Y1-086 E Adder 2.04 MW 1.73 MW
916192 Z1-068 E Adder 1.76 MW 1.5 MW
923832 AB2-022 E Adder 1.15 MW 0.98 MW
923842 AB2-024 E Adder 1.62 MW 1.38 MW
923852 AB2-025 E Adder 1.03 MW 0.88 MW
923862 AB2-026 E Adder 1.09 MW 0.93 MW
925022 AB2-158 E 50/50 5.02 MW 5.02 MW
930122 AB1-027 E Adder 1.27 MW 1.08 MW
938552 AE1-074 E 50/50 1.22 MW 1.22 MW
938562 AE1-075 E Adder 0.93 MW 0.79 MW
939312 AE1-162 E Adder 1.34 MW 1.14 MW
946262 AF1-291 E Adder 1.36 MW 1.16 MW
957411 AF2-035 C Adder 7.74 MW 6.58 MW
957412 AF2-035 E Adder 3.87 MW 3.29 MW
957492 AF2-043 E Adder 1.32 MW 1.12 MW
957601 AF2-054 C Adder 1.91 MW 1.62 MW
957602 AF2-054 E Adder 1.27 MW 1.08 MW
962962 AG1-145 E Adder 1.34 MW 1.14 MW
962971 AG1-146 C Adder 2.76 MW 2.35 MW
962972 AG1-146 E Adder 1.84 MW 1.56 MW
962981 AG1-147 C Adder 6.44 MW 5.47 MW
962982 AG1-147 E Adder 4.29 MW 3.65 MW
963051 AG1-154 C Adder 3.13 MW 2.66 MW
963052 AG1-154 E Adder 4.69 MW 3.99 MW
901082 W1-029 E Adder 29.37 MW 24.96 MW
917122 Z2-027 E Adder 1.24 MW 1.05 MW
925332 AB2-190 E Adder 7.61 MW 6.47 MW
925522 AC1-027 E Adder 1.14 MW 0.97 MW
942001 AE2-212 C Adder 2.04 MW 1.74 MW
942002 AE2-212 E Adder 1.36 MW 1.16 MW
957832 AF2-077 E Adder 1.31 MW 1.11 MW
957871 AF2-081 C Adder 9.31 MW 7.92 MW
957872 AF2-081 E Adder 3.99 MW 3.39 MW
958161 AF2-110 C Adder 1.27 MW 1.08 MW
958162 AF2-110 E Adder 2.02 MW 1.72 MW
313811 6ELKO L286 Adder 1.28 MW 1.09 MW
933291 AC2-141 C Adder 28.54 MW 24.26 MW
933292 AC2-141 E Adder 12.18 MW 10.36 MW
939411 AE1-173 C Adder 82.19 MW 69.86 MW
939412 AE1-173 E Adder 54.8 MW 46.58 MW
934012 AD1-025 E Adder 9.42 MW 8.0 MW
927041 AC1-191 C Adder 8.8 MW 7.48 MW
927042 AC1-191 E Adder 4.38 MW 3.73 MW
313053 6PAPERMILL Adder 5.99 MW 5.09 MW
314594 6PLYMOUTH TP Adder 0.29 MW 0.24 MW
314632 6AYDLETT TAP Adder 1.26 MW 1.07 MW
316160 AE1-175 E Adder 1.1 MW 0.94 MW
316164 AC1-076_C 50/50 1.01 MW 1.01 MW
316169 AC1-164 GEN Adder 36.94 MW 31.4 MW
316170 AC1-121 C Adder 2.18 MW 1.85 MW
316192 AB2-158 C 50/50 1.9 MW 1.9 MW
316233 AE1-074 C 50/50 2.41 MW 2.41 MW
316240 AF1-291 C Adder 2.05 MW 1.74 MW
316254 AC1-120 C Adder 6.33 MW 5.38 MW
924516 AB2-100 E1 Adder 2.51 MW 2.13 MW
924517 AB2-100 E2 Adder 2.51 MW 2.13 MW
926785 AC1-164_E Adder 16.6 MW 14.11 MW
934065 AD1-033 E Adder 4.69 MW 3.99 MW
937226 AE2-253 E Adder 5.45 MW 4.63 MW
939612 AE1-191 E Adder 5.14 MW 4.37 MW
926004 AC1-076_E 50/50 5.77 MW 5.77 MW
926486 AC1-120 E Adder 3.26 MW 2.77 MW
926502 AC1-121 E Adder 1.02 MW 0.87 MW
919153 AA1-139 E2 Adder 3.81 MW 3.24 MW
919152 AA1-139 E1 Adder 3.81 MW 3.24 MW
920692 AA2-178 E Adder 3.68 MW 3.13 MW
924814 AB2-134 E Adder 11.91 MW 10.12 MW
316084 AB2-161 E Adder 5.19 MW 4.41 MW
316044 AC1-158 C1 50/50 15.0 MW 15.0 MW
316045 AC1-158 C2 50/50 15.0 MW 15.0 MW
926739 AC1-158 E1 50/50 39.1 MW 39.1 MW
926740 AC1-158 E2 50/50 39.1 MW 39.1 MW
932046 AC2-012 E Adder 12.29 MW 10.44 MW
316311 AC2-079 C Adder 5.35 MW 4.55 MW
932596 AC2-079 E Adder 8.73 MW 7.42 MW
934146 AD1-041 E Adder 3.22 MW 2.73 MW
934576 AD1-082 E Adder 4.14 MW 3.52 MW
316349 AD2-085 C Adder 3.21 MW 2.73 MW
936666 AD2-085 E Adder 5.24 MW 4.46 MW
961611 AG1-000B C Adder 14.97 MW 12.72 MW
941591 AE2-156 C Adder 16.79 MW 14.27 MW
944581 AF1-123 C Adder 42.45 MW 36.08 MW
944582 AF1-123 E Adder 97.21 MW 82.63 MW
944591 AF1-124 C Adder 42.6 MW 36.21 MW
944592 AF1-124 E Adder 97.56 MW 82.92 MW
944601 AF1-125 C Adder 41.8 MW 35.53 MW
944602 AF1-125 E Adder 95.68 MW 81.33 MW
944631 AF1-128 C Adder 37.14 MW 31.57 MW
965281 AG1-393 C Adder 2.04 MW 1.73 MW
965282 AG1-393 E Adder 1.36 MW 1.16 MW
934501 AD1-074 C Adder 29.84 MW 25.36 MW
934502 AD1-074 E Adder 15.19 MW 12.91 MW
934511 AD1-075 C Adder 3.91 MW 3.32 MW
935161 AD1-151 C Adder 15.2 MW 12.92 MW
935162 AD1-151 E Adder 10.14 MW 8.62 MW
938531 AE1-072 C Adder 16.36 MW 13.9 MW
938532 AE1-072 E Adder 8.53 MW 7.25 MW
939191 AE1-149 C Adder 10.12 MW 8.61 MW
939192 AE1-149 E Adder 6.75 MW 5.74 MW
939261 AE1-157 C Adder 12.41 MW 10.55 MW
939262 AE1-157 E Adder 6.73 MW 5.72 MW
939602 AE1-190 E Adder 1.29 MW 1.09 MW
940431 AE2-027 C Adder 12.24 MW 10.4 MW
940432 AE2-027 E Adder 8.16 MW 6.94 MW
940481 AE2-033 C Adder 14.36 MW 12.21 MW
940482 AE2-033 E Adder 9.68 MW 8.23 MW
940541 AE2-040 C Adder 2.56 MW 2.17 MW
940551 AE2-041 C Adder 6.45 MW 5.48 MW
940641 AE2-051 C 50/50 15.53 MW 15.53 MW
940642 AE2-051 E 50/50 10.36 MW 10.36 MW
941101 AE2-104 C Adder 3.12 MW 2.65 MW
941102 AE2-104 E Adder 4.95 MW 4.21 MW
943471 AF1-018 C Adder 6.45 MW 5.48 MW
944641 AF1-129 C Adder 97.11 MW 82.55 MW
315085 1SPRUNCC 50/50 0.16 MW 0.16 MW
315086 1SPRUNCD 50/50 0.16 MW 0.16 MW
316303 AF2-085 50/50 3.72 MW 3.72 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 5.32 MW 5.32 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.48 MW 10.48 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 66.43 MW 66.43 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.94 MW 3.94 MW
NY PJM->LTFIMP_NY CLTF 1.93 MW 1.93 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.31 MW 0.31 MW
WEC LTFEXP_WEC->PJM CLTF 0.14 MW 0.14 MW
CPLE LTFEXP_CPLE->PJM CLTF 8.38 MW 8.38 MW
TVA LTFEXP_TVA->PJM CLTF 3.28 MW 3.28 MW
MEC LTFEXP_MEC->PJM CLTF 1.32 MW 1.32 MW
LAGN LTFEXP_LAGN->PJM CLTF 4.19 MW 4.19 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 25.16 MW 25.16 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 3.99 MW 3.99 MW

Details for 8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line
314908 to 314911 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 116.33 %
Rating: 4070.2 MVA
Rating Type: B
MVA to Mitigate: 4735.04 MVA
MW Contribution: 246.75 MW
Impact of Topology Modeling:
Decrease
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.77 MW 0.65 MW
961942 AG1-037 E Adder 0.51 MW 0.44 MW
962331 AG1-082 C Adder 3.08 MW 2.62 MW
962332 AG1-082 E Adder 2.05 MW 1.75 MW
963041 AG1-153 C Adder 7.76 MW 6.59 MW
963042 AG1-153 E Adder 11.64 MW 9.89 MW
965291 AG1-394 C Adder 1.32 MW 1.12 MW
965292 AG1-394 E Adder 2.42 MW 2.06 MW
314541 3WATKINS Adder 1.09 MW 0.93 MW
920042 AA2-088 E OP Adder 16.4 MW 13.94 MW
934521 AD1-076 C Adder 19.06 MW 16.2 MW
934522 AD1-076 E Adder 9.72 MW 8.26 MW
943172 AE2-346 E Adder 0.92 MW 0.79 MW
944011 AF1-069 C Adder 18.06 MW 15.35 MW
944012 AF1-069 E Adder 7.01 MW 5.96 MW
316141 AB2-099 E Adder 0.38 MW 0.33 MW
900672 V4-068 E Adder 0.55 MW 0.47 MW
940492 AE2-034 E Adder 4.88 MW 4.15 MW
941031 AE2-094 C Adder 55.26 MW 46.97 MW
941032 AE2-094 E Adder 24.75 MW 21.04 MW
957521 AF2-046 C Adder 21.75 MW 18.48 MW
957522 AF2-046 E Adder 10.99 MW 9.34 MW
314539 3UNCAMP Adder 9.7 MW 8.24 MW
916042 Z1-036 E Adder 46.14 MW 39.22 MW
938771 AE1-103 C Adder 4.7 MW 4.0 MW
938772 AE1-103 E Adder 6.49 MW 5.52 MW
314331 6POE Adder 2.15 MW 1.82 MW
314421 6WINCHST 50/50 0.23 MW 0.23 MW
314507 3THOMPSN Adder 3.4 MW 2.89 MW
314525 6KINGFORK Adder 1.7 MW 1.45 MW
314550 6HICKORY Adder 3.66 MW 3.11 MW
315060 1CHESTF5 50/50 107.27 MW 107.27 MW
315061 1CHESTG7 50/50 6.54 MW 6.54 MW
315062 1CHESTS7 50/50 3.0 MW 3.0 MW
315063 1CHESTG8 50/50 6.44 MW 6.44 MW
315064 1CHESTS8 50/50 3.32 MW 3.32 MW
315065 1CHESTF6 Adder 31.93 MW 27.14 MW
315068 1DARBY 2 50/50 4.25 MW 4.25 MW
315069 1DARBY 3 50/50 4.26 MW 4.26 MW
315070 1DARBY 4 50/50 4.27 MW 4.27 MW
315073 1STONECA Adder 11.5 MW 9.77 MW
315083 1SPRUNCA Adder 14.54 MW 12.36 MW
315084 1SPRUNCB Adder 14.54 MW 12.36 MW
315092 1YORKTN3 50/50 230.1 MW 230.1 MW
925865 AC1-065 E Adder 27.3 MW 23.21 MW
926412 AC1-112 E 50/50 1.9 MW 1.9 MW
926662 AC1-147 E Adder 2.23 MW 1.9 MW
926755 AC1-161 E 50/50 22.2 MW 22.2 MW
927226 AC1-216 E Adder 12.96 MW 11.02 MW
934392 AD1-063 E Adder 1.77 MW 1.5 MW
935112 AD1-144 E Adder 1.58 MW 1.34 MW
936591 AD2-074 C Adder 8.49 MW 7.21 MW
936592 AD2-074 E Adder 13.85 MW 11.77 MW
942341 AE2-247 C Adder 2.45 MW 2.08 MW
942342 AE2-247 E Adder 3.38 MW 2.88 MW
943461 AF1-017 C Adder 2.22 MW 1.89 MW
943462 AF1-017 E Adder 3.62 MW 3.08 MW
943612 AF1-032 E Adder 1.54 MW 1.31 MW
943741 AF1-042 C Adder 4.44 MW 3.77 MW
943742 AF1-042 E Adder 7.25 MW 6.16 MW
961951 AG1-038 C Adder 4.91 MW 4.17 MW
961952 AG1-038 E Adder 6.78 MW 5.76 MW
966871 AG1-558 C Adder 3.73 MW 3.17 MW
966872 AG1-558 E Adder 1.88 MW 1.6 MW
315233 1SURRY 2 50/50 44.38 MW 44.38 MW
315260 1GOSPORTA Adder 3.58 MW 3.05 MW
315261 1GOSPORTB Adder 4.58 MW 3.89 MW
315262 1GOSPORTC Adder 3.89 MW 3.3 MW
316075 AC2-137 C 50/50 0.65 MW 0.65 MW
316076 AC2-137 E 50/50 2.29 MW 2.29 MW
316157 AD2-030 E Adder 1.94 MW 1.65 MW
913392 Y1-086 E Adder 3.64 MW 3.09 MW
916192 Z1-068 E Adder 3.16 MW 2.69 MW
923832 AB2-022 E Adder 2.05 MW 1.75 MW
923842 AB2-024 E Adder 2.98 MW 2.54 MW
923852 AB2-025 E Adder 1.71 MW 1.45 MW
930122 AB1-027 E 50/50 2.33 MW 2.33 MW
938552 AE1-074 E Adder 1.89 MW 1.61 MW
939312 AE1-162 E Adder 2.41 MW 2.05 MW
946262 AF1-291 E Adder 2.33 MW 1.98 MW
957492 AF2-043 E Adder 2.36 MW 2.01 MW
957601 AF2-054 C Adder 3.45 MW 2.93 MW
957602 AF2-054 E Adder 2.3 MW 1.96 MW
962962 AG1-145 E 50/50 2.53 MW 2.53 MW
962971 AG1-146 C Adder 4.77 MW 4.05 MW
962972 AG1-146 E Adder 3.18 MW 2.7 MW
962981 AG1-147 C Adder 11.13 MW 9.46 MW
962982 AG1-147 E Adder 7.42 MW 6.31 MW
901082 W1-029 E Adder 52.36 MW 44.51 MW
917122 Z2-027 E Adder 2.22 MW 1.88 MW
925332 AB2-190 E Adder 13.51 MW 11.48 MW
925522 AC1-027 E Adder 2.05 MW 1.74 MW
942001 AE2-212 C Adder 3.47 MW 2.95 MW
942002 AE2-212 E Adder 2.31 MW 1.96 MW
957832 AF2-077 E Adder 2.41 MW 2.04 MW
957871 AF2-081 C Adder 16.69 MW 14.19 MW
957872 AF2-081 E Adder 7.15 MW 6.08 MW
958161 AF2-110 C Adder 2.26 MW 1.92 MW
958162 AF2-110 E Adder 3.59 MW 3.05 MW
313811 6ELKO L286 50/50 2.39 MW 2.39 MW
933291 AC2-141 C 50/50 52.01 MW 52.01 MW
933292 AC2-141 E 50/50 22.2 MW 22.2 MW
939411 AE1-173 C Adder 137.04 MW 116.48 MW
939412 AE1-173 E Adder 91.36 MW 77.66 MW
934012 AD1-025 E Adder 16.78 MW 14.26 MW
927041 AC1-191 C Adder 14.97 MW 12.72 MW
927042 AC1-191 E Adder 7.46 MW 6.34 MW
933981 AD1-022 C Adder 13.57 MW 11.53 MW
933982 AD1-022 E Adder 7.39 MW 6.28 MW
961681 AG1-008 C Adder 21.75 MW 18.48 MW
961682 AG1-008 E Adder 10.99 MW 9.34 MW
313053 6PAPERMILL Adder 11.01 MW 9.36 MW
314594 6PLYMOUTH TP Adder 0.5 MW 0.43 MW
314632 6AYDLETT TAP Adder 2.26 MW 1.92 MW
316004 AC1-112 C 50/50 0.56 MW 0.56 MW
316159 AE1-175 C 50/50 0.69 MW 0.69 MW
316160 AE1-175 E 50/50 2.09 MW 2.09 MW
316169 AC1-164 GEN 50/50 70.87 MW 70.87 MW
316233 AE1-074 C Adder 3.76 MW 3.2 MW
316240 AF1-291 C Adder 3.5 MW 2.98 MW
316294 AC1-161 C 50/50 8.5 MW 8.5 MW
316312 AB1-027 C 50/50 0.89 MW 0.89 MW
316382 AG1-145 C 50/50 0.62 MW 0.62 MW
924516 AB2-100 E1 Adder 1.06 MW 0.9 MW
924517 AB2-100 E2 Adder 4.21 MW 3.58 MW
926785 AC1-164_E 50/50 31.84 MW 31.84 MW
934065 AD1-033 E Adder 8.42 MW 7.16 MW
937226 AE2-253 E Adder 9.77 MW 8.31 MW
939612 AE1-191 E Adder 9.32 MW 7.92 MW
918512 AA1-065 E OP Adder 8.42 MW 7.16 MW
919153 AA1-139 E2 Adder 6.82 MW 5.8 MW
919152 AA1-139 E1 Adder 6.82 MW 5.8 MW
920692 AA2-178 E Adder 6.5 MW 5.53 MW
924814 AB2-134 E Adder 21.23 MW 18.05 MW
316084 AB2-161 E Adder 9.01 MW 7.66 MW
932046 AC2-012 E Adder 22.06 MW 18.75 MW
316311 AC2-079 C Adder 9.43 MW 8.01 MW
932596 AC2-079 E Adder 15.38 MW 13.07 MW
934146 AD1-041 E Adder 5.82 MW 4.95 MW
934576 AD1-082 E Adder 7.18 MW 6.1 MW
316349 AD2-085 C Adder 5.66 MW 4.81 MW
936666 AD2-085 E Adder 9.23 MW 7.84 MW
961611 AG1-000B C Adder 26.84 MW 22.81 MW
941591 AE2-156 C Adder 30.14 MW 25.62 MW
944581 AF1-123 C Adder 76.19 MW 64.76 MW
944582 AF1-123 E Adder 174.47 MW 148.3 MW
944591 AF1-124 C Adder 76.46 MW 64.99 MW
944592 AF1-124 E Adder 175.1 MW 148.84 MW
944601 AF1-125 C Adder 75.02 MW 63.77 MW
944602 AF1-125 E Adder 171.74 MW 145.97 MW
944631 AF1-128 C 50/50 67.12 MW 67.12 MW
965281 AG1-393 C Adder 3.49 MW 2.97 MW
965282 AG1-393 E Adder 2.33 MW 1.98 MW
934501 AD1-074 C Adder 52.49 MW 44.62 MW
934502 AD1-074 E Adder 26.72 MW 22.71 MW
934511 AD1-075 C Adder 13.12 MW 11.15 MW
934512 AD1-075 E Adder 6.68 MW 5.68 MW
935161 AD1-151 C Adder 27.04 MW 22.98 MW
935162 AD1-151 E Adder 18.03 MW 15.32 MW
938531 AE1-072 C Adder 29.3 MW 24.9 MW
938532 AE1-072 E Adder 15.27 MW 12.98 MW
939191 AE1-149 C Adder 17.38 MW 14.78 MW
939192 AE1-149 E Adder 11.59 MW 9.85 MW
939602 AE1-190 E Adder 2.33 MW 1.98 MW
940431 AE2-027 C Adder 20.99 MW 17.84 MW
940432 AE2-027 E Adder 14.0 MW 11.9 MW
940481 AE2-033 C Adder 23.78 MW 20.21 MW
940482 AE2-033 E Adder 16.03 MW 13.63 MW
940541 AE2-040 C Adder 4.22 MW 3.59 MW
940551 AE2-041 C Adder 11.79 MW 10.02 MW
940641 AE2-051 C Adder 25.26 MW 21.47 MW
940642 AE2-051 E Adder 16.84 MW 14.31 MW
941101 AE2-104 C Adder 5.54 MW 4.71 MW
941102 AE2-104 E Adder 8.8 MW 7.48 MW
943471 AF1-018 C Adder 11.79 MW 10.02 MW
944641 AF1-129 C Adder 166.52 MW 141.54 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 45.44 MW 45.44 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 30.64 MW 30.64 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 123.31 MW 123.31 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 6.84 MW 6.84 MW
NY PJM->LTFIMP_NY CLTF 3.12 MW 3.12 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.82 MW 1.82 MW
WEC LTFEXP_WEC->PJM CLTF 0.94 MW 0.94 MW
CPLE LTFEXP_CPLE->PJM CLTF 14.74 MW 14.74 MW
TVA LTFEXP_TVA->PJM CLTF 8.16 MW 8.16 MW
MEC LTFEXP_MEC->PJM CLTF 5.56 MW 5.56 MW
LAGN LTFEXP_LAGN->PJM CLTF 10.31 MW 10.31 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.35 MW 0.35 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 43.51 MW 43.51 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 7.03 MW 7.03 MW

Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer
314218 to 314908 ckt 2
Contingency Name:
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 109.7 %
Rating: 879.84 MVA
Rating Type: B
MVA to Mitigate: 965.14 MVA
MW Contribution: 78.42 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 2 transformer
314218 to 314908 ckt 2
Contingency Name:
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 133.9 %
Rating: 879.84 MVA
Rating Type: B
MVA to Mitigate: 1178.08 MVA
MW Contribution: 88.29 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.24 MW 0.21 MW
961942 AG1-037 E Adder 0.16 MW 0.14 MW
962331 AG1-082 C Adder 0.97 MW 0.82 MW
962332 AG1-082 E Adder 0.64 MW 0.55 MW
965291 AG1-394 C Adder 0.42 MW 0.35 MW
965292 AG1-394 E Adder 0.77 MW 0.65 MW
966621 AG1-532 C Adder 0.64 MW 0.55 MW
966622 AG1-532 E Adder 0.43 MW 0.36 MW
314541 3WATKINS Adder 0.35 MW 0.3 MW
314572 3EMPORIA Adder 0.2 MW 0.17 MW
918492 AA1-063AE OP Adder 1.91 MW 1.63 MW
920042 AA2-088 E OP Adder 5.22 MW 4.44 MW
934521 AD1-076 C Adder 5.99 MW 5.09 MW
934522 AD1-076 E Adder 3.05 MW 2.6 MW
943172 AE2-346 E Adder 0.29 MW 0.25 MW
960081 AF2-299 C Adder 0.86 MW 0.73 MW
960082 AF2-299 E Adder 0.57 MW 0.48 MW
316141 AB2-099 E Adder 0.12 MW 0.1 MW
900672 V4-068 E Adder 0.17 MW 0.15 MW
940492 AE2-034 E Adder 1.54 MW 1.31 MW
946281 AF1-292 C Adder 0.71 MW 0.6 MW
946282 AF1-292 E Adder 0.47 MW 0.4 MW
957521 AF2-046 C Adder 6.87 MW 5.84 MW
957522 AF2-046 E Adder 3.47 MW 2.95 MW
314539 3UNCAMP Adder 3.13 MW 2.66 MW
916042 Z1-036 E Adder 14.64 MW 12.44 MW
938771 AE1-103 C Adder 1.52 MW 1.29 MW
938772 AE1-103 E Adder 2.1 MW 1.79 MW
314229 6MT RD221 50/50 0.12 MW 0.12 MW
314236 6NRTHEST 50/50 0.16 MW 0.16 MW
314331 6POE Adder 0.84 MW 0.72 MW
314507 3THOMPSN Adder 1.1 MW 0.93 MW
314525 6KINGFORK Adder 0.56 MW 0.48 MW
314550 6HICKORY Adder 1.16 MW 0.99 MW
315050 1FOURRIVERG 50/50 4.25 MW 4.25 MW
315060 1CHESTF5 Adder 47.7 MW 40.54 MW
315065 1CHESTF6 Adder 14.5 MW 12.32 MW
315067 1DARBY 1 50/50 2.2 MW 2.2 MW
315068 1DARBY 2 50/50 2.2 MW 2.2 MW
315069 1DARBY 3 50/50 2.21 MW 2.21 MW
315070 1DARBY 4 50/50 2.21 MW 2.21 MW
315073 1STONECA Adder 4.92 MW 4.19 MW
315083 1SPRUNCA Adder 6.84 MW 5.81 MW
315084 1SPRUNCB Adder 6.84 MW 5.81 MW
315092 1YORKTN3 Adder 80.43 MW 68.36 MW
925865 AC1-065 E Adder 11.22 MW 9.54 MW
926412 AC1-112 E 50/50 1.02 MW 1.02 MW
926472 AC1-118 E Adder 0.64 MW 0.55 MW
926662 AC1-147 E Adder 0.72 MW 0.61 MW
926755 AC1-161 E Adder 6.83 MW 5.81 MW
927226 AC1-216 E Adder 5.1 MW 4.33 MW
934392 AD1-063 E Adder 0.72 MW 0.61 MW
934781 AD1-105 C 50/50 1.05 MW 1.05 MW
934782 AD1-105 E 50/50 4.34 MW 4.34 MW
935112 AD1-144 E Adder 0.52 MW 0.44 MW
936582 AD2-073 E Adder 0.67 MW 0.57 MW
936591 AD2-074 C Adder 3.62 MW 3.08 MW
936592 AD2-074 E Adder 5.91 MW 5.02 MW
942341 AE2-247 C Adder 0.85 MW 0.72 MW
942342 AE2-247 E Adder 1.17 MW 0.99 MW
943461 AF1-017 C Adder 0.76 MW 0.65 MW
943462 AF1-017 E Adder 1.25 MW 1.06 MW
943612 AF1-032 E Adder 0.5 MW 0.42 MW
943741 AF1-042 C Adder 1.9 MW 1.61 MW
943742 AF1-042 E Adder 3.09 MW 2.63 MW
944491 AF1-114 C Adder 3.3 MW 2.8 MW
944492 AF1-114 E Adder 4.55 MW 3.87 MW
961951 AG1-038 C Adder 2.1 MW 1.78 MW
961952 AG1-038 E Adder 2.89 MW 2.46 MW
966661 AG1-536 C Adder 3.49 MW 2.96 MW
966662 AG1-536 E Adder 4.68 MW 3.98 MW
966871 AG1-558 C 50/50 2.4 MW 2.4 MW
966872 AG1-558 E 50/50 1.21 MW 1.21 MW
966881 AG1-559 C Adder 1.38 MW 1.17 MW
966882 AG1-559 E Adder 0.69 MW 0.59 MW
315260 1GOSPORTA Adder 1.16 MW 0.98 MW
315261 1GOSPORTB Adder 1.48 MW 1.25 MW
315262 1GOSPORTC Adder 1.25 MW 1.07 MW
316076 AC2-137 E Adder 1.04 MW 0.89 MW
316078 AC2-138 E Adder 0.6 MW 0.51 MW
316157 AD2-030 E Adder 0.78 MW 0.67 MW
913392 Y1-086 E Adder 1.16 MW 0.98 MW
916192 Z1-068 E Adder 1.01 MW 0.86 MW
923832 AB2-022 E Adder 0.65 MW 0.56 MW
923842 AB2-024 E Adder 1.22 MW 1.04 MW
923852 AB2-025 E Adder 0.58 MW 0.49 MW
930122 AB1-027 E 50/50 1.25 MW 1.25 MW
938552 AE1-074 E Adder 0.82 MW 0.69 MW
939312 AE1-162 E Adder 0.84 MW 0.71 MW
946262 AF1-291 E Adder 1.04 MW 0.89 MW
957411 AF2-035 C Adder 4.96 MW 4.22 MW
957412 AF2-035 E Adder 2.48 MW 2.11 MW
957492 AF2-043 E Adder 0.76 MW 0.65 MW
957601 AF2-054 C Adder 1.4 MW 1.19 MW
957602 AF2-054 E Adder 0.93 MW 0.79 MW
962861 AG1-135 C Adder 3.94 MW 3.35 MW
962862 AG1-135 E Adder 2.62 MW 2.23 MW
962962 AG1-145 E Adder 0.94 MW 0.8 MW
962971 AG1-146 C Adder 2.02 MW 1.71 MW
962972 AG1-146 E Adder 1.34 MW 1.14 MW
962981 AG1-147 C Adder 4.7 MW 4.0 MW
962982 AG1-147 E Adder 3.14 MW 2.67 MW
963611 AG1-210 C Adder 0.43 MW 0.37 MW
963612 AG1-210 E Adder 0.65 MW 0.55 MW
964211 AG1-282 C Adder 1.32 MW 1.12 MW
964212 AG1-282 E Adder 0.88 MW 0.75 MW
901082 W1-029 E Adder 16.71 MW 14.2 MW
917122 Z2-027 E Adder 0.71 MW 0.6 MW
925332 AB2-190 E Adder 5.5 MW 4.67 MW
925522 AC1-027 E Adder 0.66 MW 0.56 MW
942001 AE2-212 C Adder 1.48 MW 1.26 MW
942002 AE2-212 E Adder 0.99 MW 0.84 MW
957832 AF2-077 E Adder 0.9 MW 0.77 MW
957871 AF2-081 C Adder 5.31 MW 4.51 MW
957872 AF2-081 E Adder 2.27 MW 1.93 MW
957971 AF2-091 C Adder 1.12 MW 0.95 MW
957972 AF2-091 E Adder 1.55 MW 1.32 MW
958161 AF2-110 C Adder 0.74 MW 0.63 MW
958162 AF2-110 E Adder 1.18 MW 1.0 MW
313811 6ELKO L286 Adder 1.09 MW 0.93 MW
314181 3NORNECK Adder 0.57 MW 0.49 MW
933291 AC2-141 C Adder 16.01 MW 13.61 MW
933292 AC2-141 E Adder 6.83 MW 5.81 MW
939411 AE1-173 C Adder 41.06 MW 34.9 MW
939412 AE1-173 E Adder 27.37 MW 23.27 MW
934012 AD1-025 E Adder 6.6 MW 5.61 MW
927041 AC1-191 C 50/50 9.65 MW 9.65 MW
927042 AC1-191 E 50/50 4.8 MW 4.8 MW
933981 AD1-022 C Adder 4.26 MW 3.62 MW
933982 AD1-022 E Adder 2.32 MW 1.97 MW
961681 AG1-008 C Adder 6.87 MW 5.84 MW
961682 AG1-008 E Adder 3.47 MW 2.95 MW
313053 6PAPERMILL Adder 4.52 MW 3.84 MW
314594 6PLYMOUTH TP Adder 0.16 MW 0.14 MW
314632 6AYDLETT TAP Adder 0.72 MW 0.61 MW
316004 AC1-112 C 50/50 0.3 MW 0.3 MW
316160 AE1-175 E Adder 0.77 MW 0.66 MW
316169 AC1-164 GEN Adder 29.63 MW 25.18 MW
316233 AE1-074 C Adder 1.62 MW 1.38 MW
316240 AF1-291 C Adder 1.57 MW 1.33 MW
316312 AB1-027 C 50/50 0.48 MW 0.48 MW
917332 KELFORD E Adder 0.79 MW 0.67 MW
924516 AB2-100 E1 Adder 1.38 MW 1.17 MW
924517 AB2-100 E2 Adder 1.38 MW 1.17 MW
926206 AC1-098 E Adder 1.27 MW 1.08 MW
926785 AC1-164_E Adder 13.31 MW 11.31 MW
934065 AD1-033 E Adder 2.68 MW 2.28 MW
937226 AE2-253 E Adder 3.11 MW 2.64 MW
939612 AE1-191 E Adder 3.81 MW 3.23 MW
315051 AA1-145 CT1 50/50 4.44 MW 4.44 MW
315052 AA1-145 CT2 50/50 4.43 MW 4.43 MW
939246 AE1-155 E Adder 5.64 MW 4.8 MW
918512 AA1-065 E OP Adder 2.64 MW 2.24 MW
919153 AA1-139 E2 Adder 2.17 MW 1.84 MW
919152 AA1-139 E1 Adder 2.17 MW 1.84 MW
920692 AA2-178 E Adder 2.05 MW 1.75 MW
924814 AB2-134 E Adder 8.35 MW 7.1 MW
316084 AB2-161 E Adder 3.34 MW 2.84 MW
316088 AB2-174 E Adder 2.98 MW 2.53 MW
932046 AC2-012 E Adder 7.12 MW 6.05 MW
316311 AC2-079 C Adder 3.23 MW 2.75 MW
932596 AC2-079 E Adder 5.27 MW 4.48 MW
934146 AD1-041 E Adder 2.38 MW 2.02 MW
934576 AD1-082 E Adder 2.66 MW 2.26 MW
316349 AD2-085 C Adder 1.95 MW 1.66 MW
936666 AD2-085 E Adder 3.18 MW 2.71 MW
961611 AG1-000B C Adder 9.99 MW 8.49 MW
941591 AE2-156 C Adder 9.72 MW 8.26 MW
944581 AF1-123 C Adder 24.22 MW 20.58 MW
944582 AF1-123 E Adder 55.45 MW 47.13 MW
944591 AF1-124 C Adder 24.3 MW 20.66 MW
944592 AF1-124 E Adder 55.65 MW 47.3 MW
944601 AF1-125 C Adder 23.84 MW 20.27 MW
944602 AF1-125 E Adder 54.58 MW 46.39 MW
944631 AF1-128 C Adder 29.85 MW 25.37 MW
958261 AF2-120 C Adder 4.05 MW 3.44 MW
958262 AF2-120 E Adder 2.7 MW 2.3 MW
965281 AG1-393 C Adder 1.5 MW 1.28 MW
965282 AG1-393 E Adder 1.0 MW 0.85 MW
934501 AD1-074 C Adder 16.49 MW 14.02 MW
934502 AD1-074 E Adder 8.39 MW 7.13 MW
934511 AD1-075 C Adder 4.12 MW 3.5 MW
934512 AD1-075 E Adder 2.1 MW 1.78 MW
935161 AD1-151 C Adder 10.83 MW 9.21 MW
935162 AD1-151 E Adder 7.22 MW 6.14 MW
938531 AE1-072 C Adder 9.32 MW 7.92 MW
938532 AE1-072 E Adder 4.86 MW 4.13 MW
939191 AE1-149 C Adder 6.77 MW 5.75 MW
939192 AE1-149 E Adder 4.51 MW 3.84 MW
939261 AE1-157 C Adder 6.57 MW 5.58 MW
939262 AE1-157 E Adder 3.56 MW 3.03 MW
939602 AE1-190 E Adder 0.95 MW 0.81 MW
940431 AE2-027 C Adder 9.16 MW 7.78 MW
940432 AE2-027 E Adder 6.1 MW 5.19 MW
940481 AE2-033 C Adder 8.06 MW 6.85 MW
940482 AE2-033 E Adder 5.43 MW 4.62 MW
940541 AE2-040 C Adder 1.44 MW 1.22 MW
940551 AE2-041 C Adder 4.82 MW 4.1 MW
940641 AE2-051 C Adder 7.4 MW 6.29 MW
940642 AE2-051 E Adder 4.93 MW 4.19 MW
941101 AE2-104 C Adder 1.82 MW 1.54 MW
941102 AE2-104 E Adder 2.89 MW 2.45 MW
943471 AF1-018 C Adder 4.82 MW 4.1 MW
944641 AF1-129 C Adder 75.6 MW 64.26 MW
315043 1FOUR RIVERA 50/50 2.79 MW 2.79 MW
315044 1FOUR RIVERB 50/50 2.79 MW 2.79 MW
315045 1FOUR RIVERC 50/50 3.4 MW 3.4 MW
315046 1FOUR RIVERD 50/50 2.75 MW 2.75 MW
315047 1FOUR RIVERE 50/50 2.75 MW 2.75 MW
315048 1FOUR RIVERF 50/50 3.35 MW 3.35 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 3.0 MW 3.0 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 28.18 MW 28.18 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.08 MW 1.08 MW
NY PJM->LTFIMP_NY CLTF 0.55 MW 0.55 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.77 MW 3.77 MW
TVA LTFEXP_TVA->PJM CLTF 1.07 MW 1.07 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.04 MW 0.04 MW
MEC LTFEXP_MEC->PJM CLTF 0.21 MW 0.21 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.09 MW 0.09 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.41 MW 1.41 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.89 MW 6.89 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.79 MW 1.79 MW

Details for 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 132.32 %
Rating: 1058.16 MVA
Rating Type: B
MVA to Mitigate: 1400.18 MVA
MW Contribution: 60.98 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 131.81 %
Rating: 1058.16 MVA
Rating Type: B
MVA to Mitigate: 1394.81 MVA
MW Contribution: 60.01 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.41 MW 0.35 MW
961672 AG1-007 E Adder 0.23 MW 0.2 MW
961941 AG1-037 C Adder 0.21 MW 0.18 MW
961942 AG1-037 E Adder 0.14 MW 0.12 MW
962331 AG1-082 C Adder 0.85 MW 0.72 MW
962332 AG1-082 E Adder 0.57 MW 0.48 MW
963041 AG1-153 C 50/50 3.75 MW 3.75 MW
963042 AG1-153 E 50/50 5.62 MW 5.62 MW
964791 AG1-342 C Adder 1.53 MW 1.3 MW
964792 AG1-342 E Adder 1.02 MW 0.87 MW
966801 AG1-551 C Adder 0.91 MW 0.77 MW
966802 AG1-551 E Adder 0.48 MW 0.41 MW
966811 AG1-552 C Adder 0.89 MW 0.75 MW
966812 AG1-552 E Adder 0.42 MW 0.36 MW
965291 AG1-394 C Adder 0.35 MW 0.3 MW
965292 AG1-394 E Adder 0.65 MW 0.55 MW
966621 AG1-532 C Adder 0.6 MW 0.51 MW
966622 AG1-532 E Adder 0.4 MW 0.34 MW
314541 3WATKINS Adder 0.28 MW 0.24 MW
314572 3EMPORIA Adder 0.19 MW 0.16 MW
315131 1EDGECMA Adder 6.83 MW 5.81 MW
918492 AA1-063AE OP Adder 1.73 MW 1.47 MW
918532 AA1-067 E Adder 0.31 MW 0.26 MW
919692 AA2-053 E OP Adder 1.82 MW 1.54 MW
920042 AA2-088 E OP Adder 4.38 MW 3.72 MW
925785 AC1-054 E Adder 1.5 MW 1.28 MW
926274 AC1-105 E Adder 1.17 MW 1.0 MW
927146 AC1-208 E Adder 1.78 MW 1.51 MW
934521 AD1-076 C Adder 5.13 MW 4.36 MW
934522 AD1-076 E Adder 2.62 MW 2.22 MW
943172 AE2-346 E Adder 0.26 MW 0.22 MW
943902 AF1-058 E Adder 0.57 MW 0.48 MW
944011 AF1-069 C 50/50 8.9 MW 8.9 MW
944012 AF1-069 E 50/50 3.46 MW 3.46 MW
959311 AF2-222 C Adder 5.8 MW 4.93 MW
959312 AF2-222 E Adder 3.89 MW 3.31 MW
960061 AF2-297 C Adder 3.42 MW 2.91 MW
960062 AF2-297 E Adder 2.28 MW 1.94 MW
960081 AF2-299 C Adder 0.8 MW 0.68 MW
960082 AF2-299 E Adder 0.54 MW 0.46 MW
316141 AB2-099 E Adder 0.11 MW 0.09 MW
900672 V4-068 E Adder 0.15 MW 0.13 MW
917342 Z2-044 E Adder 0.27 MW 0.23 MW
922923 AB1-081 E OP Adder 1.64 MW 1.4 MW
923263 AB1-132 E OP Adder 2.63 MW 2.23 MW
923573 AB1-173 E OP Adder 1.41 MW 1.2 MW
924162 AB2-060 E OP Adder 1.77 MW 1.51 MW
924302 AB2-077 E O1 Adder 0.57 MW 0.48 MW
924312 AB2-078 E O1 Adder 0.57 MW 0.48 MW
924322 AB2-079 E O1 Adder 0.57 MW 0.48 MW
925612 AC1-036 E Adder 0.31 MW 0.27 MW
939181 AE1-148 C Adder 3.96 MW 3.36 MW
939182 AE1-148 E Adder 2.64 MW 2.24 MW
940492 AE2-034 E Adder 1.28 MW 1.09 MW
941011 AE2-092 C Adder -4.44 MW -3.77 MW
941031 AE2-094 C 50/50 27.23 MW 27.23 MW
941032 AE2-094 E 50/50 12.2 MW 12.2 MW
946281 AF1-292 C Adder 0.66 MW 0.56 MW
946282 AF1-292 E Adder 0.44 MW 0.38 MW
957481 AF2-042 C Adder 29.33 MW 24.93 MW
957482 AF2-042 E Adder 19.55 MW 16.62 MW
957521 AF2-046 C Adder 5.93 MW 5.04 MW
957522 AF2-046 E Adder 3.0 MW 2.55 MW
957861 AF2-080 C Adder 3.33 MW 2.83 MW
957862 AF2-080 E Adder 1.48 MW 1.25 MW
314539 3UNCAMP Adder 2.43 MW 2.06 MW
916042 Z1-036 E Adder 11.81 MW 10.04 MW
938771 AE1-103 C Adder 1.16 MW 0.99 MW
938772 AE1-103 E Adder 1.6 MW 1.36 MW
314507 3THOMPSN Adder 0.8 MW 0.68 MW
314525 6KINGFORK Adder 0.36 MW 0.31 MW
314550 6HICKORY Adder 0.9 MW 0.77 MW
926662 AC1-147 E Adder 0.52 MW 0.45 MW
926755 AC1-161 E Adder 5.65 MW 4.8 MW
935112 AD1-144 E Adder 0.34 MW 0.28 MW
942341 AE2-247 C Adder 0.49 MW 0.42 MW
942342 AE2-247 E Adder 0.68 MW 0.58 MW
943461 AF1-017 C Adder 0.45 MW 0.38 MW
943462 AF1-017 E Adder 0.73 MW 0.62 MW
943612 AF1-032 E Adder 0.37 MW 0.31 MW
315102 1BRUNSWICKG1 50/50 5.53 MW 5.53 MW
315103 1BRUNSWICKG2 50/50 5.53 MW 5.53 MW
315104 1BRUNSWICKG3 50/50 5.53 MW 5.53 MW
315105 1BRUNSWICKS1 50/50 11.49 MW 11.49 MW
315241 1Z1-086 GT1 50/50 7.11 MW 7.11 MW
315242 1Z1-086 GT2 50/50 7.1 MW 7.1 MW
315243 1Z1-086 GT3 50/50 7.1 MW 7.1 MW
315244 1Z1-086 ST 50/50 12.37 MW 12.37 MW
315260 1GOSPORTA Adder 0.84 MW 0.71 MW
315261 1GOSPORTB Adder 1.08 MW 0.91 MW
315262 1GOSPORTC Adder 0.91 MW 0.78 MW
913392 Y1-086 E Adder 0.91 MW 0.77 MW
916192 Z1-068 E Adder 0.76 MW 0.65 MW
923832 AB2-022 E Adder 0.51 MW 0.43 MW
923852 AB2-025 E Adder 0.5 MW 0.43 MW
957492 AF2-043 E Adder 0.57 MW 0.48 MW
901082 W1-029 E Adder 13.03 MW 11.07 MW
917122 Z2-027 E Adder 0.55 MW 0.47 MW
925522 AC1-027 E Adder 0.49 MW 0.42 MW
957871 AF2-081 C Adder 4.13 MW 3.51 MW
957872 AF2-081 E Adder 1.77 MW 1.51 MW
958161 AF2-110 C Adder 0.52 MW 0.44 MW
958162 AF2-110 E Adder 0.83 MW 0.71 MW
314722 3TWITTYS Adder 0.35 MW 0.29 MW
917512 Z2-088 E OP1 Adder 2.14 MW 1.82 MW
926071 AC1-086 C Adder 9.03 MW 7.67 MW
926072 AC1-086 E Adder 4.11 MW 3.49 MW
927021 AC1-189 C Adder 3.67 MW 3.12 MW
927022 AC1-189 E Adder 1.83 MW 1.55 MW
936261 AD2-033 C Adder 4.4 MW 3.74 MW
936262 AD2-033 E Adder 2.93 MW 2.49 MW
933291 AC2-141 C Adder 13.23 MW 11.25 MW
933292 AC2-141 E Adder 5.65 MW 4.8 MW
934621 AD1-088 C Adder 5.98 MW 5.08 MW
934622 AD1-088 E Adder 2.81 MW 2.39 MW
939411 AE1-173 C 50/50 54.42 MW 54.42 MW
939412 AE1-173 E 50/50 36.28 MW 36.28 MW
933981 AD1-022 C Adder 3.68 MW 3.13 MW
933982 AD1-022 E Adder 2.0 MW 1.7 MW
962572 AG1-106 E Adder 0.51 MW 0.43 MW
961681 AG1-008 C Adder 5.93 MW 5.04 MW
961682 AG1-008 E Adder 3.0 MW 2.55 MW
962571 AG1-106 C Adder 1.17 MW 0.99 MW
314594 6PLYMOUTH TP Adder 0.14 MW 0.12 MW
314632 6AYDLETT TAP Adder 0.56 MW 0.48 MW
316263 AC1-034 C Adder 2.92 MW 2.48 MW
316274 AC1-208 C Adder 4.0 MW 3.4 MW
316336 AC2-165 C Adder -10.77 MW -9.16 MW
917332 KELFORD E Adder 0.71 MW 0.6 MW
924516 AB2-100 E1 Adder 1.24 MW 1.06 MW
924517 AB2-100 E2 Adder 1.24 MW 1.06 MW
925595 AC1-034 E Adder 2.21 MW 1.88 MW
926206 AC1-098 E Adder 1.61 MW 1.37 MW
926214 AC1-099 E Adder 0.53 MW 0.45 MW
927255 AC1-221 E Adder 1.7 MW 1.44 MW
927264 AC1-222 E Adder 1.72 MW 1.46 MW
932763 AC2-100 E Adder 1.15 MW 0.98 MW
934065 AD1-033 E Adder 2.07 MW 1.76 MW
937226 AE2-253 E Adder 2.42 MW 2.06 MW
918512 AA1-065 E OP Adder 2.33 MW 1.98 MW
919153 AA1-139 E2 Adder 1.69 MW 1.44 MW
919152 AA1-139 E1 Adder 1.69 MW 1.44 MW
919710 AA2-057 E Adder 1.8 MW 1.53 MW
920692 AA2-178 E Adder 1.71 MW 1.46 MW
923994 AB2-040_E Adder 2.65 MW 2.25 MW
924022 AB2-043 E O1 Adder 2.18 MW 1.86 MW
924152 AB2-059 E OP Adder 2.32 MW 1.98 MW
925122 AB2-169 E Adder 2.45 MW 2.08 MW
316088 AB2-174 E Adder 2.8 MW 2.38 MW
932046 AC2-012 E Adder 5.18 MW 4.4 MW
316311 AC2-079 C Adder 1.94 MW 1.65 MW
932596 AC2-079 E Adder 3.16 MW 2.69 MW
316349 AD2-085 C Adder 1.14 MW 0.97 MW
936666 AD2-085 E Adder 1.86 MW 1.58 MW
941591 AE2-156 C Adder 7.09 MW 6.02 MW
944581 AF1-123 C Adder 18.83 MW 16.0 MW
944582 AF1-123 E Adder 43.11 MW 36.65 MW
944591 AF1-124 C Adder 18.9 MW 16.06 MW
944592 AF1-124 E Adder 43.27 MW 36.78 MW
944601 AF1-125 C Adder 18.54 MW 15.76 MW
944602 AF1-125 E Adder 42.44 MW 36.07 MW
962491 AG1-098 C Adder 5.22 MW 4.44 MW
962492 AG1-098 E Adder 3.48 MW 2.96 MW
962561 AG1-105 C Adder 3.83 MW 3.25 MW
962562 AG1-105 E Adder 2.55 MW 2.17 MW
964241 AG1-285 C Adder 5.56 MW 4.72 MW
964242 AG1-285 E Adder 3.7 MW 3.15 MW
313764 3SOCKMAN Adder 0.31 MW 0.26 MW
932632 AC2-084 E Adder 1.42 MW 1.21 MW
934321 AD1-056 C Adder 2.73 MW 2.32 MW
934322 AD1-056 E Adder 1.48 MW 1.26 MW
934331 AD1-057 C Adder 1.52 MW 1.29 MW
934332 AD1-057 E Adder 0.79 MW 0.67 MW
934501 AD1-074 C Adder 14.13 MW 12.01 MW
934502 AD1-074 E Adder 7.19 MW 6.11 MW
934511 AD1-075 C Adder 3.53 MW 3.0 MW
934512 AD1-075 E Adder 1.8 MW 1.53 MW
934612 AD1-087 E Adder 1.86 MW 1.58 MW
935172 AD1-152 E Adder 2.71 MW 2.31 MW
936161 AD2-022 C Adder 3.15 MW 2.67 MW
936162 AD2-022 E Adder 1.89 MW 1.6 MW
936171 AD2-023 C Adder 1.84 MW 1.56 MW
936172 AD2-023 E Adder 1.0 MW 0.85 MW
937482 AD2-202 E Adder 0.54 MW 0.46 MW
938531 AE1-072 C Adder 7.26 MW 6.17 MW
938532 AE1-072 E Adder 3.79 MW 3.22 MW
938821 AE1-108 C Adder -4.69 MW -3.99 MW
940481 AE2-033 C Adder 6.99 MW 5.94 MW
940482 AE2-033 E Adder 4.71 MW 4.0 MW
940541 AE2-040 C Adder 1.24 MW 1.05 MW
940641 AE2-051 C 50/50 11.4 MW 11.4 MW
940642 AE2-051 E 50/50 7.6 MW 7.6 MW
941101 AE2-104 C Adder 1.28 MW 1.09 MW
941102 AE2-104 E Adder 2.04 MW 1.73 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 11.81 MW 11.81 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 9.22 MW 9.22 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 44.44 MW 44.44 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.11 MW 1.11 MW
NY PJM->LTFIMP_NY CLTF 0.52 MW 0.52 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.46 MW 0.46 MW
WEC LTFEXP_WEC->PJM CLTF 0.24 MW 0.24 MW
CPLE LTFEXP_CPLE->PJM CLTF 5.48 MW 5.48 MW
TVA LTFEXP_TVA->PJM CLTF 2.54 MW 2.54 MW
MEC LTFEXP_MEC->PJM CLTF 1.55 MW 1.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.27 MW 3.27 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.09 MW 0.09 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.07 MW 7.07 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.61 MW 2.61 MW

Details for 6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 567_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer
314214 to 314903 ckt 1
Contingency Name:
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 123.73 %
Rating: 934.92 MVA
Rating Type: B
MVA to Mitigate: 1156.78 MVA
MW Contribution: 87.75 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6CHCKAHM-8CHCKAHM 230.0/500.0 kV Ckt 1 transformer
314214 to 314903 ckt 1
Contingency Name:
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 128.41 %
Rating: 934.92 MVA
Rating Type: B
MVA to Mitigate: 1200.49 MVA
MW Contribution: 89.45 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.26 MW 0.22 MW
961942 AG1-037 E Adder 0.17 MW 0.14 MW
962331 AG1-082 C Adder 1.02 MW 0.87 MW
962332 AG1-082 E Adder 0.68 MW 0.58 MW
965291 AG1-394 C Adder 0.44 MW 0.37 MW
965292 AG1-394 E Adder 0.81 MW 0.69 MW
314541 3WATKINS Adder 0.38 MW 0.32 MW
918492 AA1-063AE OP Adder 1.96 MW 1.67 MW
919692 AA2-053 E OP Adder 1.97 MW 1.67 MW
920042 AA2-088 E OP Adder 5.49 MW 4.67 MW
927146 AC1-208 E Adder 1.95 MW 1.66 MW
934521 AD1-076 C Adder 6.46 MW 5.49 MW
934522 AD1-076 E Adder 3.29 MW 2.8 MW
943172 AE2-346 E Adder 0.31 MW 0.26 MW
316141 AB2-099 E Adder 0.13 MW 0.11 MW
900672 V4-068 E Adder 0.18 MW 0.15 MW
917342 Z2-044 E Adder 0.3 MW 0.26 MW
940492 AE2-034 E Adder 1.68 MW 1.42 MW
957521 AF2-046 C Adder 7.23 MW 6.14 MW
957522 AF2-046 E Adder 3.65 MW 3.1 MW
314539 3UNCAMP Adder 3.37 MW 2.86 MW
916042 Z1-036 E Adder 16.11 MW 13.69 MW
938771 AE1-103 C Adder 1.64 MW 1.4 MW
938772 AE1-103 E Adder 2.27 MW 1.93 MW
314184 3SHACKLE 50/50 0.6 MW 0.6 MW
314331 6POE Adder 0.72 MW 0.61 MW
314507 3THOMPSN Adder 1.23 MW 1.04 MW
314525 6KINGFORK Adder 0.65 MW 0.55 MW
314550 6HICKORY Adder 1.3 MW 1.1 MW
315060 1CHESTF5 Adder 61.61 MW 52.37 MW
315065 1CHESTF6 Adder 11.1 MW 9.43 MW
315073 1STONECA Adder 5.14 MW 4.37 MW
315083 1SPRUNCA Adder 4.63 MW 3.94 MW
315084 1SPRUNCB Adder 4.63 MW 3.94 MW
315092 1YORKTN3 Adder 112.31 MW 95.46 MW
925865 AC1-065 E 50/50 18.88 MW 18.88 MW
926412 AC1-112 E Adder 0.95 MW 0.81 MW
926472 AC1-118 E Adder 1.07 MW 0.91 MW
926662 AC1-147 E Adder 0.81 MW 0.69 MW
926755 AC1-161 E Adder 7.68 MW 6.53 MW
927226 AC1-216 E Adder 5.58 MW 4.74 MW
934392 AD1-063 E 50/50 1.28 MW 1.28 MW
935112 AD1-144 E Adder 0.6 MW 0.51 MW
936582 AD2-073 E Adder 1.15 MW 0.97 MW
936591 AD2-074 C 50/50 6.21 MW 6.21 MW
936592 AD2-074 E 50/50 10.14 MW 10.14 MW
942341 AE2-247 C Adder 0.89 MW 0.75 MW
942342 AE2-247 E Adder 1.22 MW 1.04 MW
943461 AF1-017 C Adder 0.8 MW 0.68 MW
943462 AF1-017 E Adder 1.31 MW 1.11 MW
943612 AF1-032 E Adder 0.56 MW 0.47 MW
943741 AF1-042 C 50/50 3.25 MW 3.25 MW
943742 AF1-042 E 50/50 5.3 MW 5.3 MW
944491 AF1-114 C Adder 5.07 MW 4.31 MW
944492 AF1-114 E Adder 7.0 MW 5.95 MW
961951 AG1-038 C 50/50 3.59 MW 3.59 MW
961952 AG1-038 E 50/50 4.96 MW 4.96 MW
966661 AG1-536 C 50/50 6.01 MW 6.01 MW
966662 AG1-536 E 50/50 8.07 MW 8.07 MW
315260 1GOSPORTA Adder 1.3 MW 1.1 MW
315261 1GOSPORTB Adder 1.66 MW 1.41 MW
315262 1GOSPORTC Adder 1.41 MW 1.2 MW
316075 AC2-137 C 50/50 0.45 MW 0.45 MW
316076 AC2-137 E 50/50 1.58 MW 1.58 MW
316078 AC2-138 E Adder 1.04 MW 0.89 MW
316156 AD2-030 C 50/50 0.42 MW 0.42 MW
316157 AD2-030 E 50/50 1.33 MW 1.33 MW
913392 Y1-086 E Adder 1.29 MW 1.1 MW
916192 Z1-068 E Adder 1.13 MW 0.96 MW
923832 AB2-022 E Adder 0.73 MW 0.62 MW
923842 AB2-024 E 50/50 2.23 MW 2.23 MW
923852 AB2-025 E Adder 0.54 MW 0.46 MW
930122 AB1-027 E Adder 1.17 MW 0.99 MW
939312 AE1-162 E Adder 0.96 MW 0.81 MW
946262 AF1-291 E Adder 0.81 MW 0.69 MW
957492 AF2-043 E Adder 0.86 MW 0.73 MW
957601 AF2-054 C 50/50 2.37 MW 2.37 MW
957602 AF2-054 E 50/50 1.58 MW 1.58 MW
962861 AG1-135 C 50/50 6.78 MW 6.78 MW
962862 AG1-135 E 50/50 4.52 MW 4.52 MW
962962 AG1-145 E 50/50 1.53 MW 1.53 MW
962971 AG1-146 C 50/50 3.45 MW 3.45 MW
962972 AG1-146 E 50/50 2.3 MW 2.3 MW
962981 AG1-147 C 50/50 8.05 MW 8.05 MW
962982 AG1-147 E 50/50 5.36 MW 5.36 MW
963611 AG1-210 C Adder 0.74 MW 0.63 MW
963612 AG1-210 E Adder 1.12 MW 0.95 MW
964211 AG1-282 C 50/50 2.32 MW 2.32 MW
964212 AG1-282 E 50/50 1.55 MW 1.55 MW
901082 W1-029 E Adder 18.56 MW 15.78 MW
917122 Z2-027 E Adder 0.78 MW 0.67 MW
925332 AB2-190 E Adder 5.9 MW 5.02 MW
925522 AC1-027 E Adder 0.74 MW 0.62 MW
942001 AE2-212 C Adder 1.19 MW 1.01 MW
942002 AE2-212 E Adder 0.79 MW 0.67 MW
957832 AF2-077 E Adder 1.39 MW 1.18 MW
957871 AF2-081 C Adder 5.93 MW 5.04 MW
957872 AF2-081 E Adder 2.54 MW 2.16 MW
957971 AF2-091 C Adder 1.72 MW 1.46 MW
957972 AF2-091 E Adder 2.38 MW 2.02 MW
958161 AF2-110 C Adder 0.81 MW 0.69 MW
958162 AF2-110 E Adder 1.29 MW 1.1 MW
313811 6ELKO L286 50/50 1.65 MW 1.65 MW
314181 3NORNECK Adder 0.99 MW 0.84 MW
933291 AC2-141 C Adder 18.0 MW 15.3 MW
933292 AC2-141 E Adder 7.68 MW 6.53 MW
939411 AE1-173 C Adder 42.86 MW 36.43 MW
939412 AE1-173 E Adder 28.57 MW 24.29 MW
934012 AD1-025 E Adder 7.22 MW 6.14 MW
933981 AD1-022 C Adder 4.58 MW 3.89 MW
933982 AD1-022 E Adder 2.49 MW 2.12 MW
961681 AG1-008 C Adder 7.23 MW 6.14 MW
961682 AG1-008 E Adder 3.65 MW 3.1 MW
313053 6PAPERMILL 50/50 8.16 MW 8.16 MW
314594 6PLYMOUTH TP Adder 0.17 MW 0.15 MW
314632 6AYDLETT TAP Adder 0.8 MW 0.68 MW
316059 AD1-063 C 50/50 0.31 MW 0.31 MW
316159 AE1-175 C 50/50 0.42 MW 0.42 MW
316160 AE1-175 E 50/50 1.27 MW 1.27 MW
316169 AC1-164 GEN 50/50 59.58 MW 59.58 MW
316240 AF1-291 C Adder 1.21 MW 1.03 MW
316274 AC1-208 C Adder 4.4 MW 3.74 MW
316314 AB2-024 C 50/50 0.36 MW 0.36 MW
316382 AG1-145 C 50/50 0.38 MW 0.38 MW
917332 KELFORD E Adder 0.82 MW 0.7 MW
924516 AB2-100 E1 Adder 1.32 MW 1.12 MW
924517 AB2-100 E2 Adder 1.32 MW 1.12 MW
926206 AC1-098 E Adder 1.8 MW 1.53 MW
926214 AC1-099 E Adder 0.6 MW 0.51 MW
926785 AC1-164_E 50/50 26.77 MW 26.77 MW
934065 AD1-033 E Adder 3.0 MW 2.55 MW
937226 AE2-253 E Adder 3.47 MW 2.95 MW
939611 AE1-191 C 50/50 1.54 MW 1.54 MW
939612 AE1-191 E 50/50 6.42 MW 6.42 MW
316201 AC1-065 C 50/50 1.85 MW 1.85 MW
316404 AE1-155 C 50/50 2.37 MW 2.37 MW
939246 AE1-155 E 50/50 9.72 MW 9.72 MW
918512 AA1-065 E OP Adder 2.8 MW 2.38 MW
919153 AA1-139 E2 Adder 2.42 MW 2.06 MW
919152 AA1-139 E1 Adder 2.42 MW 2.06 MW
919710 AA2-057 E Adder 1.98 MW 1.69 MW
920692 AA2-178 E Adder 2.23 MW 1.9 MW
924814 AB2-134 E Adder 9.14 MW 7.77 MW
316084 AB2-161 E Adder 3.28 MW 2.79 MW
925122 AB2-169 E Adder 2.83 MW 2.4 MW
932046 AC2-012 E Adder 7.98 MW 6.79 MW
316311 AC2-079 C Adder 3.41 MW 2.9 MW
932596 AC2-079 E Adder 5.56 MW 4.73 MW
316280 AD1-041 C 50/50 0.98 MW 0.98 MW
934146 AD1-041 E 50/50 4.01 MW 4.01 MW
934576 AD1-082 E Adder 2.62 MW 2.22 MW
316349 AD2-085 C Adder 2.05 MW 1.74 MW
936666 AD2-085 E Adder 3.34 MW 2.84 MW
961611 AG1-000B C Adder 11.28 MW 9.59 MW
941591 AE2-156 C Adder 10.9 MW 9.27 MW
944581 AF1-123 C Adder 27.1 MW 23.03 MW
944582 AF1-123 E Adder 62.05 MW 52.74 MW
944591 AF1-124 C Adder 27.19 MW 23.11 MW
944592 AF1-124 E Adder 62.27 MW 52.93 MW
944601 AF1-125 C Adder 26.68 MW 22.68 MW
944602 AF1-125 E Adder 61.08 MW 51.91 MW
944631 AF1-128 C Adder 38.55 MW 32.77 MW
958261 AF2-120 C 50/50 6.98 MW 6.98 MW
958262 AF2-120 E 50/50 4.66 MW 4.66 MW
965281 AG1-393 C Adder 1.32 MW 1.12 MW
965282 AG1-393 E Adder 0.88 MW 0.75 MW
932632 AC2-084 E Adder 1.59 MW 1.35 MW
934501 AD1-074 C Adder 17.79 MW 15.12 MW
934502 AD1-074 E Adder 9.06 MW 7.7 MW
934511 AD1-075 C Adder 4.45 MW 3.78 MW
934512 AD1-075 E Adder 2.26 MW 1.93 MW
935161 AD1-151 C Adder 11.73 MW 9.97 MW
935162 AD1-151 E Adder 7.82 MW 6.65 MW
938531 AE1-072 C Adder 10.4 MW 8.84 MW
938532 AE1-072 E Adder 5.42 MW 4.61 MW
939191 AE1-149 C Adder 6.37 MW 5.41 MW
939192 AE1-149 E Adder 4.24 MW 3.61 MW
939601 AE1-190 C 50/50 0.38 MW 0.38 MW
939602 AE1-190 E 50/50 1.6 MW 1.6 MW
940431 AE2-027 C Adder 8.04 MW 6.83 MW
940432 AE2-027 E Adder 5.36 MW 4.56 MW
940481 AE2-033 C Adder 7.46 MW 6.34 MW
940482 AE2-033 E Adder 5.03 MW 4.28 MW
940541 AE2-040 C Adder 1.33 MW 1.13 MW
940551 AE2-041 C 50/50 8.53 MW 8.53 MW
940641 AE2-051 C Adder 7.5 MW 6.38 MW
940642 AE2-051 E Adder 5.0 MW 4.25 MW
941101 AE2-104 C Adder 1.99 MW 1.69 MW
941102 AE2-104 E Adder 3.17 MW 2.69 MW
943471 AF1-018 C 50/50 8.53 MW 8.53 MW
944641 AF1-129 C Adder 57.89 MW 49.2 MW
957191 AF2-013 C Adder 8.09 MW 6.87 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.13 MW 1.13 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 3.92 MW 3.92 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 29.25 MW 29.25 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.13 MW 1.13 MW
NY PJM->LTFIMP_NY CLTF 0.56 MW 0.56 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.07 MW 0.07 MW
WEC LTFEXP_WEC->PJM CLTF 0.03 MW 0.03 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.85 MW 3.85 MW
TVA LTFEXP_TVA->PJM CLTF 1.27 MW 1.27 MW
MEC LTFEXP_MEC->PJM CLTF 0.43 MW 0.43 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.66 MW 1.66 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.02 MW 0.02 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.22 MW 7.22 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.83 MW 1.83 MW

Details for 6CHESTF A-6IRON208 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6CHESTF A-6IRON208 230.0 kV Ckt 1 line
314286 to 314309 ckt 1
Contingency Name:
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 122.25 %
Rating: 663.64 MVA
Rating Type: B
MVA to Mitigate: 811.33 MVA
MW Contribution: 47.22 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: DVP
Facility Description:
6CHESTF A-6IRON208 230.0 kV Ckt 1 line
314286 to 314309 ckt 1
Contingency Name:
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 120.34 %
Rating: 663.64 MVA
Rating Type: B
MVA to Mitigate: 798.65 MVA
MW Contribution: 45.65 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314539 3UNCAMP Adder 1.77 MW 1.51 MW
916042 Z1-036 E Adder 8.51 MW 7.23 MW
938771 AE1-103 C Adder 0.87 MW 0.74 MW
938772 AE1-103 E Adder 1.2 MW 1.02 MW
314507 3THOMPSN Adder 0.68 MW 0.58 MW
314525 6KINGFORK Adder 0.36 MW 0.3 MW
314550 6HICKORY Adder 0.7 MW 0.59 MW
315060 1CHESTF5 50/50 79.72 MW 79.72 MW
315061 1CHESTG7 50/50 4.86 MW 4.86 MW
315062 1CHESTS7 50/50 2.23 MW 2.23 MW
315063 1CHESTG8 50/50 4.79 MW 4.79 MW
315064 1CHESTS8 50/50 2.46 MW 2.46 MW
315073 1STONECA 50/50 4.67 MW 4.67 MW
315076 1HOPPOLC 50/50 1.04 MW 1.04 MW
315077 1HOPHCF1 50/50 1.65 MW 1.65 MW
315078 1HOPHCF2 50/50 1.65 MW 1.65 MW
315079 1HOPHCF3 50/50 1.65 MW 1.65 MW
315080 1HOPHCF4 50/50 2.5 MW 2.5 MW
315092 1YORKTN3 Adder 54.33 MW 46.18 MW
925865 AC1-065 E Adder 7.58 MW 6.44 MW
926472 AC1-118 E Adder 0.4 MW 0.34 MW
926662 AC1-147 E Adder 0.45 MW 0.38 MW
926755 AC1-161 E Adder 3.95 MW 3.36 MW
927226 AC1-216 E 50/50 4.35 MW 4.35 MW
934392 AD1-063 E Adder 0.51 MW 0.43 MW
935112 AD1-144 E Adder 0.33 MW 0.28 MW
936582 AD2-073 E Adder 0.44 MW 0.37 MW
936591 AD2-074 C Adder 2.44 MW 2.08 MW
936592 AD2-074 E Adder 3.99 MW 3.39 MW
942341 AE2-247 C Adder 0.5 MW 0.42 MW
942342 AE2-247 E Adder 0.68 MW 0.58 MW
943461 AF1-017 C Adder 0.45 MW 0.38 MW
943462 AF1-017 E Adder 0.73 MW 0.62 MW
943612 AF1-032 E Adder 0.3 MW 0.25 MW
943741 AF1-042 C Adder 1.28 MW 1.09 MW
943742 AF1-042 E Adder 2.09 MW 1.77 MW
961951 AG1-038 C Adder 1.41 MW 1.2 MW
961952 AG1-038 E Adder 1.95 MW 1.66 MW
966661 AG1-536 C Adder 2.34 MW 1.99 MW
966662 AG1-536 E Adder 3.14 MW 2.67 MW
315260 1GOSPORTA Adder 0.72 MW 0.61 MW
315261 1GOSPORTB Adder 0.92 MW 0.78 MW
315262 1GOSPORTC Adder 0.78 MW 0.66 MW
316076 AC2-137 E Adder 0.53 MW 0.45 MW
316078 AC2-138 E Adder 0.4 MW 0.34 MW
316132 AB2-190 C 50/50 2.52 MW 2.52 MW
316157 AD2-030 E Adder 0.54 MW 0.46 MW
913392 Y1-086 E Adder 0.69 MW 0.59 MW
916192 Z1-068 E Adder 0.62 MW 0.53 MW
923832 AB2-022 E Adder 0.39 MW 0.33 MW
923842 AB2-024 E Adder 0.87 MW 0.74 MW
939312 AE1-162 E Adder 0.6 MW 0.51 MW
957492 AF2-043 E Adder 0.46 MW 0.39 MW
957601 AF2-054 C Adder 0.96 MW 0.81 MW
957602 AF2-054 E Adder 0.64 MW 0.54 MW
962861 AG1-135 C Adder 2.65 MW 2.25 MW
962862 AG1-135 E Adder 1.76 MW 1.5 MW
962962 AG1-145 E Adder 0.66 MW 0.56 MW
962971 AG1-146 C Adder 1.36 MW 1.16 MW
962972 AG1-146 E Adder 0.91 MW 0.77 MW
962981 AG1-147 C Adder 3.18 MW 2.71 MW
962982 AG1-147 E Adder 2.12 MW 1.8 MW
963611 AG1-210 C Adder 0.29 MW 0.24 MW
963612 AG1-210 E Adder 0.43 MW 0.37 MW
964211 AG1-282 C Adder 0.89 MW 0.76 MW
964212 AG1-282 E Adder 0.6 MW 0.51 MW
901082 W1-029 E Adder 9.91 MW 8.42 MW
917122 Z2-027 E Adder 0.42 MW 0.36 MW
925332 AB2-190 E 50/50 4.91 MW 4.91 MW
925522 AC1-027 E Adder 0.4 MW 0.34 MW
957832 AF2-077 E Adder 0.61 MW 0.52 MW
957871 AF2-081 C Adder 3.18 MW 2.71 MW
957872 AF2-081 E Adder 1.36 MW 1.16 MW
958161 AF2-110 C Adder 0.44 MW 0.38 MW
958162 AF2-110 E Adder 0.7 MW 0.6 MW
313811 6ELKO L286 Adder 0.55 MW 0.47 MW
314181 3NORNECK Adder 0.38 MW 0.33 MW
933291 AC2-141 C Adder 9.25 MW 7.86 MW
933292 AC2-141 E Adder 3.95 MW 3.36 MW
934011 AD1-025 C 50/50 1.46 MW 1.46 MW
934012 AD1-025 E 50/50 5.63 MW 5.63 MW
313053 6PAPERMILL Adder 3.2 MW 2.72 MW
314632 6AYDLETT TAP Adder 0.43 MW 0.37 MW
316160 AE1-175 E Adder 0.54 MW 0.46 MW
316169 AC1-164 GEN 50/50 22.39 MW 22.39 MW
316369 AC1-216 C 50/50 0.9 MW 0.9 MW
926785 AC1-164_E 50/50 10.06 MW 10.06 MW
934065 AD1-033 E Adder 1.62 MW 1.38 MW
937226 AE2-253 E Adder 1.87 MW 1.59 MW
939612 AE1-191 E Adder 2.59 MW 2.2 MW
939246 AE1-155 E Adder 3.79 MW 3.22 MW
919153 AA1-139 E2 Adder 1.3 MW 1.11 MW
919152 AA1-139 E1 Adder 1.3 MW 1.11 MW
316033 AB2-134 GEN 50/50 1.18 MW 1.18 MW
924814 AB2-134 E 50/50 7.12 MW 7.12 MW
316084 AB2-161 E Adder 1.92 MW 1.63 MW
932046 AC2-012 E Adder 4.42 MW 3.75 MW
316311 AC2-079 C Adder 1.9 MW 1.61 MW
932596 AC2-079 E Adder 3.1 MW 2.63 MW
934146 AD1-041 E Adder 1.62 MW 1.37 MW
934576 AD1-082 E Adder 1.53 MW 1.3 MW
316349 AD2-085 C Adder 1.14 MW 0.97 MW
936666 AD2-085 E Adder 1.87 MW 1.59 MW
961611 AG1-000B C Adder 7.87 MW 6.69 MW
941591 AE2-156 C Adder 6.02 MW 5.12 MW
944581 AF1-123 C Adder 14.58 MW 12.39 MW
944582 AF1-123 E Adder 33.39 MW 28.38 MW
944591 AF1-124 C Adder 14.63 MW 12.44 MW
944592 AF1-124 E Adder 33.51 MW 28.48 MW
944601 AF1-125 C Adder 14.36 MW 12.2 MW
944602 AF1-125 E Adder 32.86 MW 27.93 MW
944631 AF1-128 C 50/50 49.88 MW 49.88 MW
958261 AF2-120 C Adder 2.72 MW 2.31 MW
958262 AF2-120 E Adder 1.81 MW 1.54 MW
965281 AG1-393 C Adder 0.66 MW 0.56 MW
965282 AG1-393 E Adder 0.44 MW 0.38 MW
935161 AD1-151 C 50/50 9.47 MW 9.47 MW
935162 AD1-151 E 50/50 6.31 MW 6.31 MW
938531 AE1-072 C Adder 5.58 MW 4.75 MW
938532 AE1-072 E Adder 2.91 MW 2.47 MW
939191 AE1-149 C Adder 3.84 MW 3.26 MW
939192 AE1-149 E Adder 2.56 MW 2.17 MW
939602 AE1-190 E Adder 0.65 MW 0.55 MW
940431 AE2-027 C Adder 3.98 MW 3.38 MW
940432 AE2-027 E Adder 2.65 MW 2.25 MW
940551 AE2-041 C Adder 3.38 MW 2.88 MW
941101 AE2-104 C Adder 1.08 MW 0.92 MW
941102 AE2-104 E Adder 1.72 MW 1.46 MW
943471 AF1-018 C Adder 3.38 MW 2.88 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 0.5 MW 0.5 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.74 MW 1.74 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 12.92 MW 12.92 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.57 MW 0.57 MW
NY PJM->LTFIMP_NY CLTF 0.28 MW 0.28 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.03 MW 0.03 MW
WEC LTFEXP_WEC->PJM CLTF 0.01 MW 0.01 MW
CPLE LTFEXP_CPLE->PJM CLTF 1.71 MW 1.71 MW
TVA LTFEXP_TVA->PJM CLTF 0.56 MW 0.56 MW
MEC LTFEXP_MEC->PJM CLTF 0.19 MW 0.19 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.73 MW 0.73 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.65 MW 3.65 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.81 MW 0.81 MW

Details for 6NRTHEST-6ELMONT 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6NRTHEST-6ELMONT 230.0 kV Ckt 1 line
314236 to 314218 ckt 1
Contingency Name:
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 122.86 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 833.8 MVA
MW Contribution: 63.22 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: DVP
Facility Description:
6NRTHEST-6ELMONT 230.0 kV Ckt 1 line
314236 to 314218 ckt 1
Contingency Name:
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 116.62 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 791.44 MVA
MW Contribution: 59.59 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.2 MW 0.17 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.78 MW 0.67 MW
962332 AG1-082 E Adder 0.52 MW 0.44 MW
965291 AG1-394 C Adder 0.34 MW 0.29 MW
965292 AG1-394 E Adder 0.62 MW 0.53 MW
314541 3WATKINS Adder 0.28 MW 0.24 MW
918492 AA1-063AE OP Adder 1.55 MW 1.32 MW
920042 AA2-088 E OP Adder 4.23 MW 3.59 MW
934521 AD1-076 C Adder 4.85 MW 4.12 MW
934522 AD1-076 E Adder 2.47 MW 2.1 MW
943172 AE2-346 E Adder 0.24 MW 0.2 MW
316141 AB2-099 E Adder 0.1 MW 0.08 MW
900672 V4-068 E Adder 0.14 MW 0.12 MW
940492 AE2-034 E Adder 1.25 MW 1.06 MW
957521 AF2-046 C Adder 5.57 MW 4.73 MW
957522 AF2-046 E Adder 2.81 MW 2.39 MW
314539 3UNCAMP Adder 2.53 MW 2.15 MW
916042 Z1-036 E Adder 11.83 MW 10.05 MW
938771 AE1-103 C Adder 1.23 MW 1.05 MW
938772 AE1-103 E Adder 1.7 MW 1.45 MW
314236 6NRTHEST 50/50 0.41 MW 0.41 MW
314331 6POE Adder 0.69 MW 0.59 MW
314507 3THOMPSN Adder 0.88 MW 0.75 MW
314525 6KINGFORK Adder 0.45 MW 0.39 MW
314550 6HICKORY Adder 0.94 MW 0.8 MW
315060 1CHESTF5 Adder 33.53 MW 28.5 MW
315065 1CHESTF6 Adder 12.06 MW 10.25 MW
315067 1DARBY 1 50/50 5.13 MW 5.13 MW
315068 1DARBY 2 50/50 5.14 MW 5.14 MW
315069 1DARBY 3 50/50 5.16 MW 5.16 MW
315070 1DARBY 4 50/50 5.17 MW 5.17 MW
315073 1STONECA Adder 3.82 MW 3.25 MW
315083 1SPRUNCA 50/50 10.71 MW 10.71 MW
315084 1SPRUNCB 50/50 10.71 MW 10.71 MW
315092 1YORKTN3 Adder 65.96 MW 56.06 MW
925865 AC1-065 E Adder 9.35 MW 7.95 MW
926472 AC1-118 E Adder 0.45 MW 0.38 MW
926662 AC1-147 E Adder 0.58 MW 0.49 MW
926755 AC1-161 E Adder 5.53 MW 4.7 MW
927226 AC1-216 E Adder 4.01 MW 3.41 MW
934392 AD1-063 E Adder 0.6 MW 0.51 MW
935112 AD1-144 E Adder 0.42 MW 0.36 MW
936582 AD2-073 E Adder 0.49 MW 0.42 MW
936591 AD2-074 C Adder 2.86 MW 2.43 MW
936592 AD2-074 E Adder 4.66 MW 3.96 MW
942341 AE2-247 C Adder 0.68 MW 0.58 MW
942342 AE2-247 E Adder 0.95 MW 0.8 MW
943461 AF1-017 C Adder 0.62 MW 0.53 MW
943462 AF1-017 E Adder 1.01 MW 0.86 MW
943612 AF1-032 E Adder 0.4 MW 0.34 MW
943741 AF1-042 C Adder 1.49 MW 1.27 MW
943742 AF1-042 E Adder 2.44 MW 2.07 MW
961951 AG1-038 C Adder 1.65 MW 1.4 MW
961952 AG1-038 E Adder 2.28 MW 1.94 MW
966661 AG1-536 C Adder 2.71 MW 2.3 MW
966662 AG1-536 E Adder 3.64 MW 3.1 MW
315260 1GOSPORTA Adder 0.93 MW 0.79 MW
315261 1GOSPORTB Adder 1.19 MW 1.01 MW
315262 1GOSPORTC Adder 1.01 MW 0.86 MW
316075 AC2-137 C 50/50 0.44 MW 0.44 MW
316076 AC2-137 E 50/50 1.54 MW 1.54 MW
316078 AC2-138 E Adder 0.46 MW 0.4 MW
316157 AD2-030 E Adder 0.64 MW 0.55 MW
913392 Y1-086 E Adder 0.93 MW 0.79 MW
916192 Z1-068 E Adder 0.82 MW 0.69 MW
923832 AB2-022 E Adder 0.53 MW 0.45 MW
923842 AB2-024 E Adder 1.02 MW 0.87 MW
923852 AB2-025 E Adder 0.47 MW 0.4 MW
939312 AE1-162 E Adder 0.67 MW 0.57 MW
946262 AF1-291 E Adder 0.87 MW 0.74 MW
957492 AF2-043 E Adder 0.62 MW 0.52 MW
957601 AF2-054 C Adder 1.15 MW 0.98 MW
957602 AF2-054 E Adder 0.77 MW 0.65 MW
962861 AG1-135 C Adder 3.07 MW 2.61 MW
962862 AG1-135 E Adder 2.05 MW 1.74 MW
962962 AG1-145 E Adder 0.78 MW 0.67 MW
962971 AG1-146 C Adder 1.6 MW 1.36 MW
962972 AG1-146 E Adder 1.07 MW 0.91 MW
962981 AG1-147 C Adder 3.74 MW 3.18 MW
962982 AG1-147 E Adder 2.49 MW 2.12 MW
963611 AG1-210 C Adder 0.33 MW 0.28 MW
963612 AG1-210 E Adder 0.5 MW 0.42 MW
964211 AG1-282 C Adder 1.03 MW 0.87 MW
964212 AG1-282 E Adder 0.68 MW 0.58 MW
901082 W1-029 E Adder 13.49 MW 11.46 MW
917122 Z2-027 E Adder 0.57 MW 0.48 MW
925332 AB2-190 E Adder 4.3 MW 3.66 MW
925522 AC1-027 E Adder 0.53 MW 0.45 MW
942001 AE2-212 C Adder 1.23 MW 1.05 MW
942002 AE2-212 E Adder 0.82 MW 0.7 MW
957832 AF2-077 E Adder 0.74 MW 0.63 MW
957871 AF2-081 C Adder 4.28 MW 3.64 MW
957872 AF2-081 E Adder 1.83 MW 1.56 MW
958161 AF2-110 C Adder 0.6 MW 0.51 MW
958162 AF2-110 E Adder 0.95 MW 0.81 MW
313811 6ELKO L286 50/50 1.6 MW 1.6 MW
314181 3NORNECK Adder 0.44 MW 0.38 MW
933291 AC2-141 C Adder 12.95 MW 11.01 MW
933292 AC2-141 E Adder 5.53 MW 4.7 MW
939411 AE1-173 C Adder 32.71 MW 27.8 MW
939412 AE1-173 E Adder 21.8 MW 18.53 MW
934012 AD1-025 E Adder 5.19 MW 4.41 MW
933981 AD1-022 C Adder 3.45 MW 2.93 MW
933982 AD1-022 E Adder 1.88 MW 1.6 MW
961681 AG1-008 C Adder 5.57 MW 4.73 MW
961682 AG1-008 E Adder 2.81 MW 2.39 MW
313053 6PAPERMILL Adder 3.76 MW 3.19 MW
314594 6PLYMOUTH TP Adder 0.13 MW 0.11 MW
314632 6AYDLETT TAP Adder 0.58 MW 0.49 MW
316160 AE1-175 E Adder 0.65 MW 0.55 MW
316169 AC1-164 GEN 50/50 25.4 MW 25.4 MW
316240 AF1-291 C Adder 1.3 MW 1.11 MW
917332 KELFORD E Adder 0.64 MW 0.54 MW
924516 AB2-100 E1 Adder 1.12 MW 0.95 MW
924517 AB2-100 E2 Adder 1.12 MW 0.95 MW
926785 AC1-164_E 50/50 11.41 MW 11.41 MW
934065 AD1-033 E Adder 2.16 MW 1.84 MW
937226 AE2-253 E Adder 2.51 MW 2.13 MW
939612 AE1-191 E Adder 3.15 MW 2.68 MW
939246 AE1-155 E Adder 4.39 MW 3.73 MW
918512 AA1-065 E OP Adder 2.14 MW 1.82 MW
919153 AA1-139 E2 Adder 1.75 MW 1.49 MW
919152 AA1-139 E1 Adder 1.75 MW 1.49 MW
920692 AA2-178 E Adder 1.66 MW 1.41 MW
924814 AB2-134 E Adder 6.56 MW 5.58 MW
316084 AB2-161 E Adder 2.72 MW 2.31 MW
932046 AC2-012 E Adder 5.73 MW 4.87 MW
316311 AC2-079 C Adder 2.62 MW 2.22 MW
932596 AC2-079 E Adder 4.27 MW 3.63 MW
934146 AD1-041 E Adder 1.97 MW 1.67 MW
934576 AD1-082 E Adder 2.17 MW 1.84 MW
316349 AD2-085 C Adder 1.58 MW 1.34 MW
936666 AD2-085 E Adder 2.58 MW 2.19 MW
961611 AG1-000B C Adder 7.93 MW 6.74 MW
941591 AE2-156 C Adder 7.82 MW 6.65 MW
944581 AF1-123 C Adder 19.52 MW 16.59 MW
944582 AF1-123 E Adder 44.7 MW 37.99 MW
944591 AF1-124 C Adder 19.59 MW 16.65 MW
944592 AF1-124 E Adder 44.86 MW 38.13 MW
944601 AF1-125 C Adder 19.22 MW 16.34 MW
944602 AF1-125 E Adder 44.0 MW 37.4 MW
944631 AF1-128 C Adder 20.98 MW 17.83 MW
958261 AF2-120 C Adder 3.15 MW 2.68 MW
958262 AF2-120 E Adder 2.1 MW 1.79 MW
965281 AG1-393 C Adder 1.31 MW 1.11 MW
965282 AG1-393 E Adder 0.87 MW 0.74 MW
934501 AD1-074 C Adder 13.36 MW 11.35 MW
934502 AD1-074 E Adder 6.8 MW 5.78 MW
934511 AD1-075 C Adder 3.34 MW 2.84 MW
934512 AD1-075 E Adder 1.7 MW 1.45 MW
935161 AD1-151 C Adder 8.49 MW 7.22 MW
935162 AD1-151 E Adder 5.66 MW 4.81 MW
938531 AE1-072 C Adder 7.52 MW 6.39 MW
938532 AE1-072 E Adder 3.92 MW 3.33 MW
939191 AE1-149 C Adder 5.52 MW 4.69 MW
939192 AE1-149 E Adder 3.68 MW 3.13 MW
939602 AE1-190 E Adder 0.79 MW 0.67 MW
940431 AE2-027 C Adder 8.06 MW 6.85 MW
940432 AE2-027 E Adder 5.37 MW 4.57 MW
940481 AE2-033 C Adder 6.55 MW 5.57 MW
940482 AE2-033 E Adder 4.42 MW 3.75 MW
940541 AE2-040 C Adder 1.17 MW 0.99 MW
940551 AE2-041 C Adder 3.99 MW 3.4 MW
940641 AE2-051 C Adder 5.86 MW 4.99 MW
940642 AE2-051 E Adder 3.91 MW 3.32 MW
941101 AE2-104 C Adder 1.47 MW 1.25 MW
941102 AE2-104 E Adder 2.33 MW 1.98 MW
943471 AF1-018 C Adder 3.99 MW 3.4 MW
944641 AF1-129 C Adder 62.91 MW 53.48 MW
315085 1SPRUNCC 50/50 0.19 MW 0.19 MW
315086 1SPRUNCD 50/50 0.19 MW 0.19 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 3.49 MW 3.49 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 4.16 MW 4.16 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 24.69 MW 24.69 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.96 MW 0.96 MW
NY PJM->LTFIMP_NY CLTF 0.47 MW 0.47 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.15 MW 0.15 MW
WEC LTFEXP_WEC->PJM CLTF 0.08 MW 0.08 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.17 MW 3.17 MW
TVA LTFEXP_TVA->PJM CLTF 1.23 MW 1.23 MW
MEC LTFEXP_MEC->PJM CLTF 0.59 MW 0.59 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.59 MW 1.59 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.03 MW 0.03 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.14 MW 6.14 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.51 MW 1.51 MW

Details for 8SEPTA-8SURRY 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8SEPTA-8SURRY 500.0 kV Ckt 1 line
314923 to 314924 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 110.23 %
Rating: 2442.12 MVA
Rating Type: B
MVA to Mitigate: 2691.94 MVA
MW Contribution: 146.39 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
8SEPTA-8SURRY 500.0 kV Ckt 1 line
314923 to 314924 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 115.7 %
Rating: 2442.12 MVA
Rating Type: B
MVA to Mitigate: 2825.65 MVA
MW Contribution: 152.21 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.74 MW 0.63 MW
961672 AG1-007 E Adder 0.42 MW 0.36 MW
961791 AG1-021 C Adder 1.36 MW 1.16 MW
961792 AG1-021 E Adder 1.16 MW 0.98 MW
961941 AG1-037 C Adder 0.37 MW 0.31 MW
961942 AG1-037 E Adder 0.24 MW 0.21 MW
962331 AG1-082 C Adder 1.46 MW 1.24 MW
962332 AG1-082 E Adder 0.97 MW 0.83 MW
963041 AG1-153 C 50/50 6.65 MW 6.65 MW
963042 AG1-153 E 50/50 9.97 MW 9.97 MW
963171 AG1-166 C Adder 0.76 MW 0.64 MW
963172 AG1-166 E Adder 1.76 MW 1.5 MW
963181 AG1-167 C Adder 0.57 MW 0.48 MW
963182 AG1-167 E Adder 1.32 MW 1.12 MW
963191 AG1-168 C Adder 0.57 MW 0.48 MW
963192 AG1-168 E Adder 1.32 MW 1.12 MW
964791 AG1-342 C Adder 3.16 MW 2.69 MW
964792 AG1-342 E Adder 2.11 MW 1.79 MW
966801 AG1-551 C Adder 1.6 MW 1.36 MW
966802 AG1-551 E Adder 0.84 MW 0.72 MW
966811 AG1-552 C Adder 1.63 MW 1.39 MW
966812 AG1-552 E Adder 0.78 MW 0.66 MW
966621 AG1-532 C Adder 1.16 MW 0.98 MW
966622 AG1-532 E Adder 0.77 MW 0.66 MW
313853 3PONTONDP Adder 0.5 MW 0.43 MW
314572 3EMPORIA Adder 0.35 MW 0.3 MW
314713 3PAMPLIN Adder 0.76 MW 0.64 MW
315131 1EDGECMA Adder 12.42 MW 10.56 MW
315153 1CLOVER1 50/50 12.85 MW 12.85 MW
315154 1CLOVER2 50/50 12.73 MW 12.73 MW
918492 AA1-063AE OP Adder 3.09 MW 2.63 MW
918532 AA1-067 E Adder 0.55 MW 0.47 MW
919692 AA2-053 E OP Adder 3.31 MW 2.81 MW
925785 AC1-054 E Adder 2.91 MW 2.48 MW
926274 AC1-105 E Adder 2.39 MW 2.03 MW
927146 AC1-208 E Adder 3.21 MW 2.73 MW
934521 AD1-076 C Adder 9.07 MW 7.71 MW
934522 AD1-076 E Adder 4.62 MW 3.93 MW
943172 AE2-346 E Adder 0.44 MW 0.37 MW
943902 AF1-058 E Adder 1.14 MW 0.97 MW
944011 AF1-069 C 50/50 15.69 MW 15.69 MW
944012 AF1-069 E 50/50 6.09 MW 6.09 MW
959311 AF2-222 C Adder 14.6 MW 12.41 MW
959312 AF2-222 E Adder 9.78 MW 8.31 MW
960061 AF2-297 C Adder 6.85 MW 5.83 MW
960062 AF2-297 E Adder 4.57 MW 3.88 MW
960081 AF2-299 C Adder 1.54 MW 1.31 MW
960082 AF2-299 E Adder 1.03 MW 0.87 MW
316141 AB2-099 E Adder 0.18 MW 0.15 MW
917342 Z2-044 E Adder 0.49 MW 0.42 MW
922923 AB1-081 E OP Adder 2.97 MW 2.52 MW
923263 AB1-132 E OP Adder 4.84 MW 4.12 MW
923573 AB1-173 E OP Adder 2.66 MW 2.26 MW
924162 AB2-060 E OP Adder 3.86 MW 3.28 MW
924302 AB2-077 E O1 Adder 1.21 MW 1.03 MW
924312 AB2-078 E O1 Adder 1.21 MW 1.03 MW
924322 AB2-079 E O1 Adder 1.21 MW 1.03 MW
925612 AC1-036 E Adder 0.76 MW 0.65 MW
938371 AE1-056 C Adder 4.92 MW 4.18 MW
938372 AE1-056 E Adder 2.69 MW 2.28 MW
939181 AE1-148 C Adder 8.06 MW 6.85 MW
939182 AE1-148 E Adder 5.37 MW 4.57 MW
940492 AE2-034 E Adder 2.3 MW 1.95 MW
941031 AE2-094 C 50/50 48.01 MW 48.01 MW
941032 AE2-094 E 50/50 21.5 MW 21.5 MW
946281 AF1-292 C Adder 1.28 MW 1.08 MW
946282 AF1-292 E Adder 0.85 MW 0.72 MW
946301 AF1-294 C Adder 2.79 MW 2.38 MW
946302 AF1-294 E Adder 2.37 MW 2.01 MW
957481 AF2-042 C 50/50 56.62 MW 56.62 MW
957482 AF2-042 E 50/50 37.75 MW 37.75 MW
957521 AF2-046 C Adder 10.11 MW 8.59 MW
957522 AF2-046 E Adder 3.6 MW 3.06 MW
957861 AF2-080 C Adder 5.94 MW 5.05 MW
957862 AF2-080 E Adder 2.64 MW 2.24 MW
958211 AF2-115 C Adder 1.7 MW 1.44 MW
958212 AF2-115 E Adder 1.45 MW 1.23 MW
916042 Z1-036 E Adder 21.49 MW 18.26 MW
314507 3THOMPSN Adder 1.85 MW 1.57 MW
314550 6HICKORY 50/50 2.14 MW 2.14 MW
926662 AC1-147 E Adder 1.22 MW 1.03 MW
926755 AC1-161 E 50/50 37.0 MW 37.0 MW
315102 1BRUNSWICKG1 50/50 9.81 MW 9.81 MW
315103 1BRUNSWICKG2 50/50 9.81 MW 9.81 MW
315104 1BRUNSWICKG3 50/50 9.81 MW 9.81 MW
315105 1BRUNSWICKS1 50/50 20.39 MW 20.39 MW
315108 1ELIZAR1 50/50 3.0 MW 3.0 MW
315109 1ELIZAR2 50/50 2.95 MW 2.95 MW
315110 1ELIZAR3 50/50 3.04 MW 3.04 MW
315241 1Z1-086 GT1 50/50 12.59 MW 12.59 MW
315242 1Z1-086 GT2 50/50 12.58 MW 12.58 MW
315243 1Z1-086 GT3 50/50 12.58 MW 12.58 MW
315244 1Z1-086 ST 50/50 21.91 MW 21.91 MW
315260 1GOSPORTA Adder 1.95 MW 1.66 MW
315261 1GOSPORTB Adder 2.49 MW 2.12 MW
315262 1GOSPORTC Adder 2.12 MW 1.8 MW
913392 Y1-086 E Adder 1.87 MW 1.59 MW
916192 Z1-068 E 50/50 1.78 MW 1.78 MW
923832 AB2-022 E Adder 1.06 MW 0.9 MW
923852 AB2-025 E Adder 0.98 MW 0.83 MW
901082 W1-029 E Adder 23.29 MW 19.8 MW
917122 Z2-027 E Adder 1.1 MW 0.94 MW
925522 AC1-027 E 50/50 1.15 MW 1.15 MW
957871 AF2-081 C 50/50 9.4 MW 9.4 MW
957872 AF2-081 E 50/50 4.03 MW 4.03 MW
314722 3TWITTYS Adder 0.85 MW 0.72 MW
917512 Z2-088 E OP1 Adder 3.84 MW 3.26 MW
926071 AC1-086 C Adder 16.64 MW 14.14 MW
926072 AC1-086 E Adder 7.57 MW 6.44 MW
927021 AC1-189 C Adder 6.54 MW 5.56 MW
927022 AC1-189 E Adder 3.26 MW 2.77 MW
936261 AD2-033 C Adder 10.95 MW 9.31 MW
936262 AD2-033 E Adder 7.3 MW 6.21 MW
933291 AC2-141 C 50/50 86.68 MW 86.68 MW
933292 AC2-141 E 50/50 37.0 MW 37.0 MW
934621 AD1-088 C 50/50 12.4 MW 12.4 MW
934622 AD1-088 E 50/50 5.84 MW 5.84 MW
939411 AE1-173 C 50/50 85.83 MW 85.83 MW
939412 AE1-173 E 50/50 57.22 MW 57.22 MW
916191 Z1-068 C 50/50 0.04 MW 0.04 MW
933981 AD1-022 C Adder 6.44 MW 5.48 MW
933982 AD1-022 E Adder 3.51 MW 2.98 MW
962572 AG1-106 E Adder 0.94 MW 0.8 MW
961681 AG1-008 C Adder 10.11 MW 8.59 MW
962571 AG1-106 C Adder 2.15 MW 1.83 MW
314594 6PLYMOUTH TP Adder 0.24 MW 0.2 MW
314632 6AYDLETT TAP Adder 1.24 MW 1.06 MW
316185 AD1-033 C 50/50 1.21 MW 1.21 MW
316263 AC1-034 C Adder 5.29 MW 4.5 MW
316274 AC1-208 C Adder 7.23 MW 6.14 MW
316294 AC1-161 C 50/50 14.16 MW 14.16 MW
316316 AC1-027 C 50/50 0.3 MW 0.3 MW
917332 KELFORD E Adder 1.23 MW 1.05 MW
924516 AB2-100 E1 Adder 2.36 MW 2.01 MW
924517 AB2-100 E2 Adder 2.36 MW 2.01 MW
925595 AC1-034 E Adder 3.99 MW 3.39 MW
926206 AC1-098 E Adder 2.88 MW 2.45 MW
926214 AC1-099 E Adder 0.95 MW 0.81 MW
927255 AC1-221 E Adder 3.28 MW 2.79 MW
927264 AC1-222 E Adder 3.46 MW 2.94 MW
932763 AC2-100 E Adder 2.22 MW 1.89 MW
934065 AD1-033 E 50/50 4.96 MW 4.96 MW
937226 AE2-253 E 50/50 5.59 MW 5.59 MW
918512 AA1-065 E OP Adder 3.98 MW 3.38 MW
316017 AA1-139 ULT1 50/50 1.02 MW 1.02 MW
316018 AA1-139 ULT2 50/50 1.02 MW 1.02 MW
919153 AA1-139 E2 50/50 3.84 MW 3.84 MW
919152 AA1-139 E1 50/50 3.84 MW 3.84 MW
919710 AA2-057 E Adder 3.24 MW 2.75 MW
920692 AA2-178 E Adder 3.07 MW 2.61 MW
923994 AB2-040_E Adder 4.99 MW 4.24 MW
924022 AB2-043 E O1 Adder 4.7 MW 4.0 MW
924152 AB2-059 E OP Adder 4.21 MW 3.58 MW
925122 AB2-169 E Adder 4.33 MW 3.68 MW
316088 AB2-174 E Adder 5.31 MW 4.52 MW
316375 AC2-012 C 50/50 1.24 MW 1.24 MW
932046 AC2-012 E 50/50 12.04 MW 12.04 MW
316388 AE2-253 GEN 50/50 1.88 MW 1.88 MW
941591 AE2-156 C 50/50 16.58 MW 16.58 MW
944581 AF1-123 C 50/50 45.2 MW 45.2 MW
944582 AF1-123 E 50/50 103.51 MW 103.51 MW
944591 AF1-124 C 50/50 45.36 MW 45.36 MW
944592 AF1-124 E 50/50 103.88 MW 103.88 MW
944601 AF1-125 C 50/50 44.51 MW 44.51 MW
944602 AF1-125 E 50/50 101.88 MW 101.88 MW
962491 AG1-098 C 50/50 11.01 MW 11.01 MW
962492 AG1-098 E 50/50 7.34 MW 7.34 MW
962561 AG1-105 C Adder 7.95 MW 6.76 MW
962562 AG1-105 E Adder 5.3 MW 4.51 MW
964241 AG1-285 C Adder 12.02 MW 10.22 MW
964242 AG1-285 E Adder 8.01 MW 6.81 MW
313764 3SOCKMAN Adder 0.57 MW 0.49 MW
932632 AC2-084 E Adder 2.55 MW 2.17 MW
934321 AD1-056 C Adder 4.99 MW 4.24 MW
934322 AD1-056 E Adder 2.71 MW 2.3 MW
934331 AD1-057 C Adder 2.78 MW 2.37 MW
934332 AD1-057 E Adder 1.45 MW 1.23 MW
934501 AD1-074 C Adder 24.97 MW 21.22 MW
934502 AD1-074 E Adder 12.71 MW 10.8 MW
934511 AD1-075 C Adder 6.24 MW 5.31 MW
934512 AD1-075 E Adder 3.18 MW 2.7 MW
934611 AD1-087 C 50/50 1.26 MW 1.26 MW
934612 AD1-087 E 50/50 3.65 MW 3.65 MW
935171 AD1-152 C 50/50 1.29 MW 1.29 MW
935172 AD1-152 E 50/50 5.32 MW 5.32 MW
937481 AD2-202 C 50/50 0.37 MW 0.37 MW
937482 AD2-202 E 50/50 1.07 MW 1.07 MW
938531 AE1-072 C 50/50 16.24 MW 16.24 MW
938532 AE1-072 E 50/50 8.46 MW 8.46 MW
940481 AE2-033 C Adder 13.56 MW 11.53 MW
940482 AE2-033 E Adder 9.14 MW 7.77 MW
940541 AE2-040 C Adder 2.41 MW 2.05 MW
940641 AE2-051 C 50/50 26.25 MW 26.25 MW
940642 AE2-051 E 50/50 17.5 MW 17.5 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 24.91 MW 24.91 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 18.16 MW 18.16 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 82.64 MW 82.64 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.15 MW 2.15 MW
NY PJM->LTFIMP_NY CLTF 1.0 MW 1.0 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.96 MW 0.96 MW
WEC LTFEXP_WEC->PJM CLTF 0.51 MW 0.51 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.09 MW 10.09 MW
TVA LTFEXP_TVA->PJM CLTF 4.93 MW 4.93 MW
MEC LTFEXP_MEC->PJM CLTF 3.15 MW 3.15 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.32 MW 6.32 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.19 MW 0.19 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 13.68 MW 13.68 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.81 MW 4.81 MW

Details for 6IRON208-6SOUWEST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 557_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6IRON208-6SOUWEST 230.0 kV Ckt 1 line
314309 to 314338 ckt 1
Contingency Name:
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 113.21 %
Rating: 663.64 MVA
Rating Type: B
MVA to Mitigate: 751.33 MVA
MW Contribution: 47.15 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: DVP
Facility Description:
6IRON208-6SOUWEST 230.0 kV Ckt 1 line
314309 to 314338 ckt 1
Contingency Name:
DVP_P1-2: LN 557_SRT-S
CONTINGENCY 'DVP_P1-2: LN 557_SRT-S'
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 112.58 %
Rating: 663.64 MVA
Rating Type: B
MVA to Mitigate: 747.13 MVA
MW Contribution: 45.59 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314539 3UNCAMP Adder 1.77 MW 1.5 MW
916042 Z1-036 E Adder 8.5 MW 7.22 MW
938771 AE1-103 C Adder 0.87 MW 0.74 MW
938772 AE1-103 E Adder 1.2 MW 1.02 MW
314309 6IRON208 50/50 1.15 MW 1.15 MW
314507 3THOMPSN Adder 0.68 MW 0.58 MW
314525 6KINGFORK Adder 0.36 MW 0.3 MW
314550 6HICKORY Adder 0.7 MW 0.59 MW
315060 1CHESTF5 50/50 79.69 MW 79.69 MW
315061 1CHESTG7 50/50 4.86 MW 4.86 MW
315062 1CHESTS7 50/50 2.23 MW 2.23 MW
315063 1CHESTG8 50/50 4.79 MW 4.79 MW
315064 1CHESTS8 50/50 2.46 MW 2.46 MW
315073 1STONECA Adder 4.67 MW 3.97 MW
315077 1HOPHCF1 50/50 1.65 MW 1.65 MW
315078 1HOPHCF2 50/50 1.65 MW 1.65 MW
315079 1HOPHCF3 50/50 1.65 MW 1.65 MW
315080 1HOPHCF4 50/50 2.5 MW 2.5 MW
315092 1YORKTN3 Adder 54.27 MW 46.13 MW
925865 AC1-065 E Adder 7.57 MW 6.43 MW
926472 AC1-118 E Adder 0.4 MW 0.34 MW
926662 AC1-147 E Adder 0.45 MW 0.38 MW
926755 AC1-161 E Adder 3.94 MW 3.35 MW
927226 AC1-216 E Adder 4.34 MW 3.69 MW
934392 AD1-063 E Adder 0.51 MW 0.43 MW
935112 AD1-144 E Adder 0.33 MW 0.28 MW
936582 AD2-073 E Adder 0.44 MW 0.37 MW
936591 AD2-074 C Adder 2.44 MW 2.08 MW
936592 AD2-074 E Adder 3.98 MW 3.39 MW
942341 AE2-247 C Adder 0.5 MW 0.42 MW
942342 AE2-247 E Adder 0.68 MW 0.58 MW
943461 AF1-017 C Adder 0.45 MW 0.38 MW
943462 AF1-017 E Adder 0.73 MW 0.62 MW
943612 AF1-032 E Adder 0.3 MW 0.25 MW
943741 AF1-042 C Adder 1.28 MW 1.09 MW
943742 AF1-042 E Adder 2.08 MW 1.77 MW
961951 AG1-038 C Adder 1.41 MW 1.2 MW
961952 AG1-038 E Adder 1.95 MW 1.66 MW
966661 AG1-536 C Adder 2.34 MW 1.99 MW
966662 AG1-536 E Adder 3.14 MW 2.67 MW
315260 1GOSPORTA Adder 0.72 MW 0.61 MW
315261 1GOSPORTB Adder 0.92 MW 0.78 MW
315262 1GOSPORTC Adder 0.78 MW 0.66 MW
316076 AC2-137 E Adder 0.53 MW 0.45 MW
316078 AC2-138 E Adder 0.4 MW 0.34 MW
316157 AD2-030 E Adder 0.54 MW 0.46 MW
913392 Y1-086 E Adder 0.69 MW 0.59 MW
916192 Z1-068 E Adder 0.62 MW 0.53 MW
923832 AB2-022 E Adder 0.39 MW 0.33 MW
923842 AB2-024 E Adder 0.87 MW 0.74 MW
939312 AE1-162 E Adder 0.6 MW 0.51 MW
957492 AF2-043 E Adder 0.46 MW 0.39 MW
957601 AF2-054 C Adder 0.96 MW 0.81 MW
957602 AF2-054 E Adder 0.64 MW 0.54 MW
962861 AG1-135 C Adder 2.64 MW 2.25 MW
962862 AG1-135 E Adder 1.76 MW 1.5 MW
962962 AG1-145 E Adder 0.66 MW 0.56 MW
962971 AG1-146 C Adder 1.36 MW 1.16 MW
962972 AG1-146 E Adder 0.91 MW 0.77 MW
962981 AG1-147 C Adder 3.18 MW 2.7 MW
962982 AG1-147 E Adder 2.12 MW 1.8 MW
963611 AG1-210 C Adder 0.29 MW 0.24 MW
963612 AG1-210 E Adder 0.43 MW 0.37 MW
964211 AG1-282 C Adder 0.89 MW 0.76 MW
964212 AG1-282 E Adder 0.6 MW 0.51 MW
901082 W1-029 E Adder 9.9 MW 8.41 MW
917122 Z2-027 E Adder 0.42 MW 0.36 MW
925332 AB2-190 E Adder 4.9 MW 4.17 MW
925522 AC1-027 E Adder 0.4 MW 0.34 MW
957832 AF2-077 E Adder 0.61 MW 0.52 MW
957871 AF2-081 C Adder 3.18 MW 2.7 MW
957872 AF2-081 E Adder 1.36 MW 1.16 MW
958161 AF2-110 C Adder 0.44 MW 0.38 MW
958162 AF2-110 E Adder 0.7 MW 0.6 MW
313811 6ELKO L286 Adder 0.55 MW 0.47 MW
314181 3NORNECK Adder 0.38 MW 0.33 MW
933291 AC2-141 C Adder 9.24 MW 7.85 MW
933292 AC2-141 E Adder 3.94 MW 3.35 MW
934012 AD1-025 E Adder 5.62 MW 4.78 MW
313053 6PAPERMILL Adder 3.2 MW 2.72 MW
314632 6AYDLETT TAP Adder 0.43 MW 0.36 MW
316160 AE1-175 E Adder 0.54 MW 0.46 MW
316169 AC1-164 GEN Adder 22.37 MW 19.02 MW
926785 AC1-164_E Adder 10.05 MW 8.54 MW
934065 AD1-033 E Adder 1.62 MW 1.37 MW
937226 AE2-253 E Adder 1.86 MW 1.58 MW
939612 AE1-191 E Adder 2.58 MW 2.2 MW
939246 AE1-155 E Adder 3.78 MW 3.22 MW
919153 AA1-139 E2 Adder 1.3 MW 1.1 MW
919152 AA1-139 E1 Adder 1.3 MW 1.1 MW
924814 AB2-134 E Adder 7.12 MW 6.05 MW
316084 AB2-161 E Adder 1.92 MW 1.63 MW
932046 AC2-012 E Adder 4.41 MW 3.75 MW
316311 AC2-079 C Adder 1.9 MW 1.61 MW
932596 AC2-079 E Adder 3.09 MW 2.63 MW
934146 AD1-041 E Adder 1.61 MW 1.37 MW
934576 AD1-082 E Adder 1.53 MW 1.3 MW
316349 AD2-085 C Adder 1.14 MW 0.97 MW
936666 AD2-085 E Adder 1.86 MW 1.58 MW
961611 AG1-000B C Adder 7.86 MW 6.68 MW
941591 AE2-156 C Adder 6.02 MW 5.11 MW
944581 AF1-123 C Adder 14.56 MW 12.38 MW
944582 AF1-123 E Adder 33.34 MW 28.34 MW
944591 AF1-124 C Adder 14.61 MW 12.42 MW
944592 AF1-124 E Adder 33.46 MW 28.44 MW
944601 AF1-125 C Adder 14.34 MW 12.19 MW
944602 AF1-125 E Adder 32.82 MW 27.9 MW
944631 AF1-128 C 50/50 49.87 MW 49.87 MW
958261 AF2-120 C Adder 2.72 MW 2.31 MW
958262 AF2-120 E Adder 1.81 MW 1.54 MW
965281 AG1-393 C Adder 0.66 MW 0.56 MW
965282 AG1-393 E Adder 0.44 MW 0.38 MW
935161 AD1-151 C Adder 9.46 MW 8.04 MW
935162 AD1-151 E Adder 6.31 MW 5.36 MW
938531 AE1-072 C Adder 5.57 MW 4.74 MW
938532 AE1-072 E Adder 2.91 MW 2.47 MW
939191 AE1-149 C Adder 3.83 MW 3.26 MW
939192 AE1-149 E Adder 2.55 MW 2.17 MW
939602 AE1-190 E Adder 0.65 MW 0.55 MW
940431 AE2-027 C Adder 3.97 MW 3.38 MW
940432 AE2-027 E Adder 2.65 MW 2.25 MW
940551 AE2-041 C Adder 3.38 MW 2.87 MW
941101 AE2-104 C Adder 1.08 MW 0.92 MW
941102 AE2-104 E Adder 1.72 MW 1.46 MW
943471 AF1-018 C Adder 3.38 MW 2.87 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 0.37 MW 0.37 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.69 MW 1.69 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 12.84 MW 12.84 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.58 MW 0.58 MW
NY PJM->LTFIMP_NY CLTF 0.29 MW 0.29 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.03 MW 0.03 MW
WEC LTFEXP_WEC->PJM CLTF 0.01 MW 0.01 MW
CPLE LTFEXP_CPLE->PJM CLTF 1.7 MW 1.7 MW
TVA LTFEXP_TVA->PJM CLTF 0.55 MW 0.55 MW
MEC LTFEXP_MEC->PJM CLTF 0.18 MW 0.18 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.72 MW 0.72 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.7 MW 3.7 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.81 MW 0.81 MW

Details for 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 105.73 %
Rating: 3220.44 MVA
Rating Type: A
MVA to Mitigate: 3404.98 MVA
MW Contribution: 165.05 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 109.27 %
Rating: 3220.44 MVA
Rating Type: A
MVA to Mitigate: 3519.04 MVA
MW Contribution: 161.86 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.57 MW 0.49 MW
961942 AG1-037 E Adder 0.38 MW 0.33 MW
962331 AG1-082 C Adder 2.3 MW 1.95 MW
962332 AG1-082 E Adder 1.53 MW 1.3 MW
963041 AG1-153 C 50/50 8.47 MW 8.47 MW
963042 AG1-153 E 50/50 12.7 MW 12.7 MW
964791 AG1-342 C Adder 4.06 MW 3.45 MW
964792 AG1-342 E Adder 2.7 MW 2.3 MW
966801 AG1-551 C Adder 2.38 MW 2.02 MW
966802 AG1-551 E Adder 1.25 MW 1.06 MW
966811 AG1-552 C Adder 2.39 MW 2.03 MW
966812 AG1-552 E Adder 1.13 MW 0.96 MW
965291 AG1-394 C Adder 0.97 MW 0.82 MW
965292 AG1-394 E Adder 1.78 MW 1.51 MW
966621 AG1-532 C 50/50 1.64 MW 1.64 MW
966622 AG1-532 E 50/50 1.09 MW 1.09 MW
313506 AB1-173 C OP 50/50 1.31 MW 1.31 MW
314541 3WATKINS Adder 0.77 MW 0.66 MW
314572 3EMPORIA 50/50 0.5 MW 0.5 MW
314704 3LAWRENC 50/50 0.36 MW 0.36 MW
315153 1CLOVER1 50/50 16.33 MW 16.33 MW
315154 1CLOVER2 50/50 16.18 MW 16.18 MW
918492 AA1-063AE OP Adder 4.7 MW 3.99 MW
918532 AA1-067 E Adder 0.81 MW 0.69 MW
919692 AA2-053 E OP Adder 4.89 MW 4.16 MW
920042 AA2-088 E OP Adder 12.0 MW 10.2 MW
925785 AC1-054 E Adder 4.01 MW 3.41 MW
926274 AC1-105 E Adder 3.06 MW 2.6 MW
927146 AC1-208 E Adder 4.78 MW 4.06 MW
934521 AD1-076 C Adder 13.79 MW 11.72 MW
934522 AD1-076 E Adder 7.03 MW 5.97 MW
943172 AE2-346 E Adder 0.69 MW 0.59 MW
943902 AF1-058 E Adder 1.46 MW 1.24 MW
944011 AF1-069 C 50/50 19.96 MW 19.96 MW
944012 AF1-069 E 50/50 7.75 MW 7.75 MW
959311 AF2-222 C Adder 18.25 MW 15.51 MW
959312 AF2-222 E Adder 12.23 MW 10.39 MW
960061 AF2-297 C Adder 8.78 MW 7.46 MW
960062 AF2-297 E Adder 5.85 MW 4.98 MW
960081 AF2-299 C 50/50 2.18 MW 2.18 MW
960082 AF2-299 E 50/50 1.46 MW 1.46 MW
316141 AB2-099 E Adder 0.29 MW 0.24 MW
900672 V4-068 E Adder 0.4 MW 0.34 MW
917342 Z2-044 E Adder 0.74 MW 0.63 MW
923263 AB1-132 E OP Adder 7.04 MW 5.99 MW
923573 AB1-173 E OP 50/50 3.82 MW 3.82 MW
924162 AB2-060 E OP Adder 4.95 MW 4.21 MW
924302 AB2-077 E O1 Adder 1.56 MW 1.32 MW
924312 AB2-078 E O1 Adder 1.56 MW 1.32 MW
924322 AB2-079 E O1 Adder 1.56 MW 1.32 MW
925612 AC1-036 E Adder 0.96 MW 0.81 MW
939181 AE1-148 C Adder 10.55 MW 8.96 MW
939182 AE1-148 E Adder 7.03 MW 5.98 MW
940492 AE2-034 E Adder 3.47 MW 2.95 MW
941031 AE2-094 C 50/50 61.09 MW 61.09 MW
941032 AE2-094 E 50/50 27.36 MW 27.36 MW
946281 AF1-292 C 50/50 1.81 MW 1.81 MW
946282 AF1-292 E 50/50 1.2 MW 1.2 MW
957481 AF2-042 C 50/50 71.85 MW 71.85 MW
957482 AF2-042 E 50/50 47.9 MW 47.9 MW
957521 AF2-046 C Adder 16.11 MW 13.7 MW
957522 AF2-046 E Adder 8.14 MW 6.92 MW
957861 AF2-080 C Adder 8.62 MW 7.33 MW
957862 AF2-080 E Adder 3.82 MW 3.25 MW
314539 3UNCAMP Adder 6.76 MW 5.75 MW
916042 Z1-036 E Adder 32.03 MW 27.22 MW
938771 AE1-103 C Adder 3.24 MW 2.76 MW
938772 AE1-103 E Adder 4.48 MW 3.81 MW
313526 AB2-022 C 50/50 0.42 MW 0.42 MW
314507 3THOMPSN Adder 2.22 MW 1.88 MW
314525 6KINGFORK Adder 1.06 MW 0.9 MW
314550 6HICKORY 50/50 2.45 MW 2.45 MW
926662 AC1-147 E Adder 1.45 MW 1.24 MW
926755 AC1-161 E 50/50 14.76 MW 14.76 MW
935112 AD1-144 E Adder 0.98 MW 0.83 MW
942341 AE2-247 C Adder 1.54 MW 1.31 MW
942342 AE2-247 E Adder 2.12 MW 1.81 MW
943461 AF1-017 C Adder 1.39 MW 1.18 MW
943462 AF1-017 E Adder 2.27 MW 1.93 MW
943612 AF1-032 E Adder 1.02 MW 0.87 MW
315102 1BRUNSWICKG1 50/50 12.5 MW 12.5 MW
315103 1BRUNSWICKG2 50/50 12.5 MW 12.5 MW
315104 1BRUNSWICKG3 50/50 12.5 MW 12.5 MW
315105 1BRUNSWICKS1 50/50 25.96 MW 25.96 MW
315108 1ELIZAR1 50/50 3.53 MW 3.53 MW
315109 1ELIZAR2 50/50 3.47 MW 3.47 MW
315110 1ELIZAR3 50/50 3.57 MW 3.57 MW
315241 1Z1-086 GT1 50/50 16.02 MW 16.02 MW
315242 1Z1-086 GT2 50/50 16.02 MW 16.02 MW
315243 1Z1-086 GT3 50/50 16.02 MW 16.02 MW
315244 1Z1-086 ST 50/50 27.89 MW 27.89 MW
315260 1GOSPORTA Adder 2.34 MW 1.99 MW
315261 1GOSPORTB Adder 2.99 MW 2.54 MW
315262 1GOSPORTC Adder 2.54 MW 2.15 MW
913392 Y1-086 E 50/50 2.46 MW 2.46 MW
916192 Z1-068 E 50/50 2.09 MW 2.09 MW
923832 AB2-022 E 50/50 1.39 MW 1.39 MW
923852 AB2-025 E 50/50 1.38 MW 1.38 MW
957492 AF2-043 E Adder 1.57 MW 1.33 MW
901082 W1-029 E Adder 35.56 MW 30.22 MW
917122 Z2-027 E 50/50 1.5 MW 1.5 MW
925522 AC1-027 E 50/50 1.35 MW 1.35 MW
957871 AF2-081 C 50/50 11.21 MW 11.21 MW
957872 AF2-081 E 50/50 4.8 MW 4.8 MW
958161 AF2-110 C Adder 1.49 MW 1.26 MW
958162 AF2-110 E Adder 2.37 MW 2.01 MW
314722 3TWITTYS Adder 1.06 MW 0.9 MW
926071 AC1-086 C Adder 24.19 MW 20.57 MW
926072 AC1-086 E Adder 11.01 MW 9.36 MW
927021 AC1-189 C Adder 9.5 MW 8.07 MW
927022 AC1-189 E Adder 4.73 MW 4.02 MW
936261 AD2-033 C Adder 11.55 MW 9.82 MW
933291 AC2-141 C 50/50 34.59 MW 34.59 MW
933292 AC2-141 E 50/50 14.76 MW 14.76 MW
934621 AD1-088 C 50/50 15.66 MW 15.66 MW
934622 AD1-088 E 50/50 7.37 MW 7.37 MW
939411 AE1-173 C 50/50 127.65 MW 127.65 MW
939412 AE1-173 E 50/50 85.1 MW 85.1 MW
916191 Z1-068 C 50/50 0.05 MW 0.05 MW
933981 AD1-022 C Adder 9.88 MW 8.4 MW
933982 AD1-022 E Adder 5.38 MW 4.57 MW
962572 AG1-106 E Adder 1.37 MW 1.16 MW
961681 AG1-008 C Adder 16.11 MW 13.7 MW
961682 AG1-008 E Adder 8.14 MW 6.92 MW
962571 AG1-106 C Adder 3.13 MW 2.66 MW
314594 6PLYMOUTH TP Adder 0.36 MW 0.31 MW
314632 6AYDLETT TAP 50/50 1.52 MW 1.52 MW
316023 AB2-100 C2 50/50 1.12 MW 1.12 MW
316185 AD1-033 C 50/50 1.38 MW 1.38 MW
316274 AC1-208 C Adder 10.76 MW 9.15 MW
316294 AC1-161 C 50/50 5.65 MW 5.65 MW
316315 AB2-025 C 50/50 0.48 MW 0.48 MW
316316 AC1-027 C 50/50 0.35 MW 0.35 MW
316320 Y1-086 C 50/50 0.25 MW 0.25 MW
316321 Z2-027 C 50/50 0.41 MW 0.41 MW
316365 AB2-100 C1 50/50 1.12 MW 1.12 MW
917332 KELFORD E Adder 1.9 MW 1.61 MW
924516 AB2-100 E1 50/50 3.38 MW 3.38 MW
924517 AB2-100 E2 50/50 3.38 MW 3.38 MW
926206 AC1-098 E Adder 4.34 MW 3.69 MW
926214 AC1-099 E Adder 1.43 MW 1.22 MW
934065 AD1-033 E 50/50 5.63 MW 5.63 MW
937226 AE2-253 E 50/50 6.55 MW 6.55 MW
918512 AA1-065 E OP Adder 6.26 MW 5.32 MW
316017 AA1-139 ULT1 50/50 1.21 MW 1.21 MW
316018 AA1-139 ULT2 50/50 1.21 MW 1.21 MW
919153 AA1-139 E2 50/50 4.58 MW 4.58 MW
919152 AA1-139 E1 50/50 4.58 MW 4.58 MW
919710 AA2-057 E Adder 4.83 MW 4.11 MW
920692 AA2-178 E Adder 4.62 MW 3.93 MW
316181 AB2-040 GEN 50/50 1.48 MW 1.48 MW
923994 AB2-040_E 50/50 7.17 MW 7.17 MW
924022 AB2-043 E O1 Adder 6.04 MW 5.13 MW
925122 AB2-169 E Adder 6.49 MW 5.51 MW
316087 AB2-174 C 50/50 1.37 MW 1.37 MW
316088 AB2-174 E 50/50 7.6 MW 7.6 MW
932046 AC2-012 E Adder 14.38 MW 12.23 MW
316311 AC2-079 C Adder 5.96 MW 5.06 MW
932596 AC2-079 E Adder 9.72 MW 8.26 MW
316349 AD2-085 C Adder 3.55 MW 3.02 MW
936666 AD2-085 E Adder 5.79 MW 4.92 MW
316388 AE2-253 GEN 50/50 2.21 MW 2.21 MW
941591 AE2-156 C 50/50 19.67 MW 19.67 MW
944581 AF1-123 C 50/50 50.97 MW 50.97 MW
944582 AF1-123 E 50/50 116.7 MW 116.7 MW
944591 AF1-124 C 50/50 51.15 MW 51.15 MW
944592 AF1-124 E 50/50 117.13 MW 117.13 MW
944601 AF1-125 C 50/50 50.18 MW 50.18 MW
944602 AF1-125 E 50/50 114.87 MW 114.87 MW
962491 AG1-098 C 50/50 13.88 MW 13.88 MW
962492 AG1-098 E 50/50 9.25 MW 9.25 MW
962561 AG1-105 C Adder 10.2 MW 8.67 MW
962562 AG1-105 E Adder 6.8 MW 5.78 MW
964241 AG1-285 C 50/50 15.25 MW 15.25 MW
964242 AG1-285 E 50/50 10.17 MW 10.17 MW
313764 3SOCKMAN 50/50 0.83 MW 0.83 MW
932632 AC2-084 E Adder 3.83 MW 3.26 MW
934321 AD1-056 C Adder 7.12 MW 6.05 MW
934322 AD1-056 E Adder 3.86 MW 3.28 MW
934331 AD1-057 C Adder 3.97 MW 3.38 MW
934332 AD1-057 E Adder 2.07 MW 1.76 MW
934501 AD1-074 C Adder 37.98 MW 32.28 MW
934502 AD1-074 E Adder 19.33 MW 16.43 MW
934511 AD1-075 C Adder 9.49 MW 8.07 MW
934512 AD1-075 E Adder 4.83 MW 4.11 MW
934611 AD1-087 C 50/50 1.61 MW 1.61 MW
934612 AD1-087 E 50/50 4.64 MW 4.64 MW
935171 AD1-152 C 50/50 1.65 MW 1.65 MW
935172 AD1-152 E 50/50 6.79 MW 6.79 MW
937481 AD2-202 C 50/50 0.47 MW 0.47 MW
937482 AD2-202 E 50/50 1.36 MW 1.36 MW
938531 AE1-072 C 50/50 19.7 MW 19.7 MW
938532 AE1-072 E 50/50 10.27 MW 10.27 MW
940481 AE2-033 C 50/50 19.22 MW 19.22 MW
940482 AE2-033 E 50/50 12.96 MW 12.96 MW
940541 AE2-040 C 50/50 3.42 MW 3.42 MW
940641 AE2-051 C 50/50 25.91 MW 25.91 MW
940642 AE2-051 E 50/50 17.27 MW 17.27 MW
941101 AE2-104 C Adder 3.64 MW 3.1 MW
941102 AE2-104 E Adder 5.79 MW 4.92 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 29.97 MW 29.97 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 23.14 MW 23.14 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 108.88 MW 108.88 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 3.59 MW 3.59 MW
NY PJM->LTFIMP_NY CLTF 1.68 MW 1.68 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.18 MW 1.18 MW
WEC LTFEXP_WEC->PJM CLTF 0.62 MW 0.62 MW
CPLE LTFEXP_CPLE->PJM CLTF 13.38 MW 13.38 MW
TVA LTFEXP_TVA->PJM CLTF 6.37 MW 6.37 MW
MEC LTFEXP_MEC->PJM CLTF 3.92 MW 3.92 MW
LAGN LTFEXP_LAGN->PJM CLTF 8.15 MW 8.15 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.24 MW 0.24 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 22.86 MW 22.86 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 6.38 MW 6.38 MW

Details for 6LIGH209-6LANEXA 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 567_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6LIGH209-6LANEXA 230.0 kV Ckt 1 line
314391 to 314388 ckt 1
Contingency Name:
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 100.35 %
Rating: 663.64 MVA
Rating Type: B
MVA to Mitigate: 665.95 MVA
MW Contribution: 74.21 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6LIGH209-6LANEXA 230.0 kV Ckt 1 line
314391 to 314388 ckt 1
Contingency Name:
DVP_P1-2: LN 567_SRT-A
CONTINGENCY 'DVP_P1-2: LN 567_SRT-A'
 OPEN BRANCH FROM BUS 314903 TO BUS 314924 CKT 1   /*8CHCKAHM     500.0 - 8SURRY       500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 103.99 %
Rating: 663.64 MVA
Rating Type: B
MVA to Mitigate: 690.14 MVA
MW Contribution: 74.3 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.19 MW 0.16 MW
961942 AG1-037 E Adder 0.12 MW 0.1 MW
962331 AG1-082 C Adder 0.74 MW 0.63 MW
962332 AG1-082 E Adder 0.5 MW 0.42 MW
963041 AG1-153 C Adder 1.5 MW 1.28 MW
963042 AG1-153 E Adder 2.26 MW 1.92 MW
966801 AG1-551 C Adder 0.72 MW 0.62 MW
966802 AG1-551 E Adder 0.38 MW 0.32 MW
966811 AG1-552 C Adder 0.62 MW 0.53 MW
966812 AG1-552 E Adder 0.29 MW 0.25 MW
965291 AG1-394 C Adder 0.32 MW 0.27 MW
965292 AG1-394 E Adder 0.58 MW 0.49 MW
314541 3WATKINS Adder 0.28 MW 0.23 MW
918492 AA1-063AE OP Adder 1.34 MW 1.14 MW
918532 AA1-067 E Adder 0.24 MW 0.2 MW
919692 AA2-053 E OP Adder 1.32 MW 1.13 MW
920042 AA2-088 E OP Adder 3.96 MW 3.36 MW
927146 AC1-208 E Adder 1.33 MW 1.13 MW
934521 AD1-076 C Adder 5.01 MW 4.26 MW
934522 AD1-076 E Adder 2.55 MW 2.17 MW
943172 AE2-346 E Adder 0.22 MW 0.19 MW
944011 AF1-069 C Adder 3.52 MW 2.99 MW
944012 AF1-069 E Adder 1.37 MW 1.16 MW
316141 AB2-099 E Adder 0.09 MW 0.08 MW
900672 V4-068 E Adder 0.13 MW 0.11 MW
917342 Z2-044 E Adder 0.21 MW 0.18 MW
940492 AE2-034 E Adder 1.32 MW 1.12 MW
941031 AE2-094 C Adder 10.78 MW 9.16 MW
941032 AE2-094 E Adder 4.83 MW 4.1 MW
957521 AF2-046 C Adder 5.23 MW 4.45 MW
957522 AF2-046 E Adder 2.64 MW 2.25 MW
314539 3UNCAMP Adder 2.51 MW 2.13 MW
916042 Z1-036 E Adder 13.0 MW 11.05 MW
938771 AE1-103 C Adder 1.23 MW 1.05 MW
938772 AE1-103 E Adder 1.7 MW 1.45 MW
314421 6WINCHST 50/50 0.12 MW 0.12 MW
314507 3THOMPSN Adder 1.01 MW 0.86 MW
314525 6KINGFORK Adder 0.54 MW 0.46 MW
314550 6HICKORY Adder 1.1 MW 0.93 MW
315092 1YORKTN3 50/50 128.02 MW 128.02 MW
926662 AC1-147 E Adder 0.66 MW 0.56 MW
926755 AC1-161 E Adder 7.15 MW 6.08 MW
935112 AD1-144 E Adder 0.5 MW 0.42 MW
942341 AE2-247 C Adder 0.56 MW 0.48 MW
942342 AE2-247 E Adder 0.78 MW 0.66 MW
943461 AF1-017 C Adder 0.51 MW 0.43 MW
943462 AF1-017 E Adder 0.83 MW 0.71 MW
943612 AF1-032 E Adder 0.46 MW 0.39 MW
315233 1SURRY 2 50/50 15.99 MW 15.99 MW
315260 1GOSPORTA Adder 1.06 MW 0.9 MW
315261 1GOSPORTB Adder 1.36 MW 1.16 MW
315262 1GOSPORTC Adder 1.15 MW 0.98 MW
913392 Y1-086 E Adder 1.07 MW 0.91 MW
916192 Z1-068 E Adder 0.94 MW 0.8 MW
923832 AB2-022 E Adder 0.6 MW 0.51 MW
939312 AE1-162 E Adder 0.66 MW 0.56 MW
957492 AF2-043 E Adder 0.71 MW 0.6 MW
957601 AF2-054 C Adder -1.48 MW -1.26 MW
962962 AG1-145 E 50/50 0.87 MW 0.87 MW
964211 AG1-282 C Adder -2.27 MW -1.93 MW
901082 W1-029 E Adder 15.25 MW 12.96 MW
917122 Z2-027 E Adder 0.65 MW 0.55 MW
925522 AC1-027 E Adder 0.61 MW 0.52 MW
957871 AF2-081 C Adder 4.98 MW 4.23 MW
957872 AF2-081 E Adder 2.13 MW 1.81 MW
958161 AF2-110 C Adder 0.63 MW 0.53 MW
958162 AF2-110 E Adder 1.0 MW 0.85 MW
933291 AC2-141 C Adder 16.76 MW 14.24 MW
933292 AC2-141 E Adder 7.15 MW 6.08 MW
939411 AE1-173 C Adder 33.27 MW 28.28 MW
939412 AE1-173 E Adder 22.18 MW 18.85 MW
933981 AD1-022 C Adder 3.51 MW 2.98 MW
933982 AD1-022 E Adder 1.91 MW 1.62 MW
961681 AG1-008 C Adder 5.23 MW 4.45 MW
961682 AG1-008 E Adder 2.64 MW 2.25 MW
314594 6PLYMOUTH TP Adder 0.13 MW 0.11 MW
314632 6AYDLETT TAP Adder 0.67 MW 0.57 MW
316159 AE1-175 C 50/50 0.24 MW 0.24 MW
316160 AE1-175 E 50/50 0.72 MW 0.72 MW
316274 AC1-208 C Adder 3.0 MW 2.55 MW
316382 AG1-145 C 50/50 0.21 MW 0.21 MW
917332 KELFORD E Adder 0.59 MW 0.5 MW
926206 AC1-098 E Adder 1.25 MW 1.06 MW
926214 AC1-099 E Adder 0.41 MW 0.35 MW
934065 AD1-033 E Adder 2.53 MW 2.15 MW
937226 AE2-253 E Adder 2.92 MW 2.48 MW
918512 AA1-065 E OP Adder 2.08 MW 1.77 MW
919153 AA1-139 E2 Adder 2.04 MW 1.73 MW
919152 AA1-139 E1 Adder 2.04 MW 1.73 MW
919710 AA2-057 E Adder 1.36 MW 1.15 MW
920692 AA2-178 E Adder 1.76 MW 1.5 MW
925122 AB2-169 E Adder 2.14 MW 1.82 MW
932046 AC2-012 E Adder 6.54 MW 5.56 MW
316311 AC2-079 C Adder 2.23 MW 1.89 MW
932596 AC2-079 E Adder 3.64 MW 3.09 MW
316349 AD2-085 C Adder 1.3 MW 1.11 MW
936666 AD2-085 E Adder 2.12 MW 1.81 MW
961611 AG1-000B C Adder 6.15 MW 5.22 MW
941591 AE2-156 C Adder 8.95 MW 7.6 MW
944581 AF1-123 C Adder 22.92 MW 19.48 MW
944582 AF1-123 E Adder 52.47 MW 44.6 MW
944591 AF1-124 C Adder 23.0 MW 19.55 MW
944592 AF1-124 E Adder 52.66 MW 44.76 MW
944601 AF1-125 C Adder 22.56 MW 19.18 MW
944602 AF1-125 E Adder 51.65 MW 43.9 MW
932632 AC2-084 E Adder 1.1 MW 0.94 MW
934501 AD1-074 C Adder 13.79 MW 11.72 MW
934502 AD1-074 E Adder 7.02 MW 5.97 MW
934511 AD1-075 C Adder 3.45 MW 2.93 MW
934512 AD1-075 E Adder 1.76 MW 1.49 MW
938531 AE1-072 C Adder 8.72 MW 7.41 MW
938532 AE1-072 E Adder 4.55 MW 3.86 MW
940641 AE2-051 C Adder 5.6 MW 4.76 MW
940642 AE2-051 E Adder 3.73 MW 3.17 MW
941101 AE2-104 C Adder 1.54 MW 1.31 MW
941102 AE2-104 E Adder 2.44 MW 2.08 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 5.15 MW 5.15 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 4.35 MW 4.35 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 22.02 MW 22.02 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.72 MW 0.72 MW
NY PJM->LTFIMP_NY CLTF 0.34 MW 0.34 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.2 MW 0.2 MW
WEC LTFEXP_WEC->PJM CLTF 0.11 MW 0.11 MW
CPLE LTFEXP_CPLE->PJM CLTF 2.78 MW 2.78 MW
TVA LTFEXP_TVA->PJM CLTF 1.22 MW 1.22 MW
MEC LTFEXP_MEC->PJM CLTF 0.71 MW 0.71 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.57 MW 1.57 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.04 MW 0.04 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 4.59 MW 4.59 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.32 MW 1.32 MW

Details for 6CHESTF B-6VARINA 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6CHESTF B-6VARINA 230.0 kV Ckt 1 line
314287 to 314260 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 107.46 %
Rating: 984.18 MVA
Rating Type: B
MVA to Mitigate: 1057.62 MVA
MW Contribution: 48.41 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: DVP
Facility Description:
6CHESTF B-6VARINA 230.0 kV Ckt 1 line
314287 to 314260 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 103.86 %
Rating: 984.18 MVA
Rating Type: B
MVA to Mitigate: 1022.21 MVA
MW Contribution: 45.01 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.33 MW 0.28 MW
961672 AG1-007 E Adder 0.19 MW 0.16 MW
961941 AG1-037 C Adder 0.19 MW 0.16 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.76 MW 0.65 MW
962332 AG1-082 E Adder 0.51 MW 0.43 MW
963041 AG1-153 C Adder 1.97 MW 1.68 MW
963042 AG1-153 E Adder 2.96 MW 2.52 MW
966801 AG1-551 C Adder 0.74 MW 0.63 MW
966802 AG1-551 E Adder 0.39 MW 0.33 MW
966811 AG1-552 C Adder 0.82 MW 0.7 MW
966812 AG1-552 E Adder 0.39 MW 0.33 MW
965291 AG1-394 C Adder 0.33 MW 0.28 MW
965292 AG1-394 E Adder 0.61 MW 0.52 MW
966621 AG1-532 C Adder 0.62 MW 0.52 MW
966622 AG1-532 E Adder 0.41 MW 0.35 MW
314541 3WATKINS Adder 0.27 MW 0.23 MW
314572 3EMPORIA Adder 0.19 MW 0.16 MW
315131 1EDGECMA Adder 5.45 MW 4.63 MW
918492 AA1-063AE OP Adder 1.61 MW 1.37 MW
918532 AA1-067 E Adder 0.25 MW 0.21 MW
919692 AA2-053 E OP Adder 1.67 MW 1.42 MW
920042 AA2-088 E OP Adder 4.11 MW 3.49 MW
925785 AC1-054 E Adder 1.23 MW 1.04 MW
927146 AC1-208 E Adder 1.63 MW 1.38 MW
934521 AD1-076 C Adder 4.38 MW 3.72 MW
934522 AD1-076 E Adder 2.23 MW 1.9 MW
943172 AE2-346 E Adder 0.23 MW 0.2 MW
944011 AF1-069 C Adder 4.62 MW 3.93 MW
944012 AF1-069 E Adder 1.8 MW 1.53 MW
960081 AF2-299 C Adder 0.82 MW 0.7 MW
960082 AF2-299 E Adder 0.55 MW 0.47 MW
316141 AB2-099 E Adder 0.1 MW 0.08 MW
900672 V4-068 E Adder 0.14 MW 0.12 MW
917342 Z2-044 E Adder 0.25 MW 0.21 MW
922923 AB1-081 E OP Adder 1.32 MW 1.12 MW
923263 AB1-132 E OP Adder 2.58 MW 2.2 MW
923573 AB1-173 E OP Adder 1.38 MW 1.18 MW
924162 AB2-060 E OP Adder 1.33 MW 1.13 MW
924302 AB2-077 E O1 Adder 0.42 MW 0.36 MW
924312 AB2-078 E O1 Adder 0.42 MW 0.36 MW
924322 AB2-079 E O1 Adder 0.42 MW 0.36 MW
939181 AE1-148 C Adder 2.9 MW 2.46 MW
939182 AE1-148 E Adder 1.93 MW 1.64 MW
940492 AE2-034 E Adder 1.09 MW 0.93 MW
941031 AE2-094 C Adder 14.14 MW 12.02 MW
941032 AE2-094 E Adder 6.33 MW 5.38 MW
946281 AF1-292 C Adder 0.68 MW 0.58 MW
946282 AF1-292 E Adder 0.45 MW 0.39 MW
957481 AF2-042 C Adder 17.36 MW 14.76 MW
957482 AF2-042 E Adder 11.57 MW 9.84 MW
957521 AF2-046 C Adder 5.44 MW 4.62 MW
957522 AF2-046 E Adder 2.75 MW 2.33 MW
957861 AF2-080 C Adder 2.69 MW 2.29 MW
957862 AF2-080 E Adder 1.19 MW 1.01 MW
314539 3UNCAMP Adder 2.33 MW 1.98 MW
916042 Z1-036 E Adder 9.94 MW 8.45 MW
938771 AE1-103 C Adder 1.12 MW 0.95 MW
938772 AE1-103 E Adder 1.55 MW 1.31 MW
314331 6POE 50/50 1.08 MW 1.08 MW
314507 3THOMPSN Adder 0.69 MW 0.58 MW
314525 6KINGFORK Adder 0.36 MW 0.3 MW
314550 6HICKORY Adder 0.72 MW 0.61 MW
315065 1CHESTF6 50/50 23.03 MW 23.03 MW
315073 1STONECA 50/50 4.5 MW 4.5 MW
315076 1HOPPOLC 50/50 1.0 MW 1.0 MW
315077 1HOPHCF1 50/50 1.59 MW 1.59 MW
315078 1HOPHCF2 50/50 1.59 MW 1.59 MW
315079 1HOPHCF3 50/50 1.59 MW 1.59 MW
315080 1HOPHCF4 50/50 2.41 MW 2.41 MW
315083 1SPRUNCA Adder 2.67 MW 2.27 MW
315084 1SPRUNCB Adder 2.67 MW 2.27 MW
926662 AC1-147 E Adder 0.45 MW 0.38 MW
926755 AC1-161 E Adder 3.76 MW 3.19 MW
927226 AC1-216 E Adder 4.11 MW 3.49 MW
935112 AD1-144 E Adder 0.33 MW 0.28 MW
942341 AE2-247 C Adder 0.68 MW 0.58 MW
942342 AE2-247 E Adder 0.94 MW 0.8 MW
943461 AF1-017 C Adder 0.62 MW 0.53 MW
943462 AF1-017 E Adder 1.01 MW 0.86 MW
943612 AF1-032 E Adder 0.32 MW 0.27 MW
315260 1GOSPORTA Adder 0.72 MW 0.62 MW
315261 1GOSPORTB Adder 0.93 MW 0.79 MW
315262 1GOSPORTC Adder 0.79 MW 0.67 MW
316132 AB2-190 C 50/50 2.4 MW 2.4 MW
913392 Y1-086 E Adder 0.74 MW 0.63 MW
916192 Z1-068 E Adder 0.63 MW 0.54 MW
923832 AB2-022 E Adder 0.42 MW 0.36 MW
923852 AB2-025 E Adder 0.63 MW 0.54 MW
939312 AE1-162 E Adder 0.57 MW 0.48 MW
946262 AF1-291 E 50/50 1.63 MW 1.63 MW
957492 AF2-043 E Adder 0.49 MW 0.42 MW
901082 W1-029 E Adder 10.95 MW 9.3 MW
917122 Z2-027 E Adder 0.46 MW 0.39 MW
925332 AB2-190 E 50/50 4.68 MW 4.68 MW
925522 AC1-027 E Adder 0.41 MW 0.35 MW
942001 AE2-212 C 50/50 2.11 MW 2.11 MW
942002 AE2-212 E 50/50 1.41 MW 1.41 MW
957871 AF2-081 C Adder 3.32 MW 2.83 MW
957872 AF2-081 E Adder 1.42 MW 1.21 MW
958161 AF2-110 C Adder 0.52 MW 0.44 MW
958162 AF2-110 E Adder 0.82 MW 0.7 MW
917512 Z2-088 E OP1 Adder 1.72 MW 1.46 MW
926071 AC1-086 C Adder 8.88 MW 7.55 MW
926072 AC1-086 E Adder 4.04 MW 3.44 MW
927021 AC1-189 C Adder 2.96 MW 2.52 MW
927022 AC1-189 E Adder 1.47 MW 1.25 MW
933291 AC2-141 C Adder 8.8 MW 7.48 MW
933292 AC2-141 E Adder 3.76 MW 3.19 MW
934621 AD1-088 C Adder 3.87 MW 3.29 MW
934622 AD1-088 E Adder 1.82 MW 1.55 MW
939411 AE1-173 C Adder 31.3 MW 26.61 MW
939412 AE1-173 E Adder 20.87 MW 17.74 MW
934012 AD1-025 E Adder 5.32 MW 4.52 MW
933981 AD1-022 C Adder 3.16 MW 2.69 MW
933982 AD1-022 E Adder 1.72 MW 1.46 MW
962572 AG1-106 E Adder 0.5 MW 0.43 MW
961681 AG1-008 C Adder 5.44 MW 4.62 MW
961682 AG1-008 E Adder 2.75 MW 2.33 MW
962571 AG1-106 C Adder 1.15 MW 0.98 MW
314594 6PLYMOUTH TP Adder 0.12 MW 0.1 MW
314632 6AYDLETT TAP Adder 0.45 MW 0.39 MW
316240 AF1-291 C 50/50 2.44 MW 2.44 MW
316263 AC1-034 C Adder 2.34 MW 1.99 MW
316274 AC1-208 C Adder 3.66 MW 3.12 MW
917332 KELFORD E Adder 0.63 MW 0.54 MW
924516 AB2-100 E1 Adder 1.37 MW 1.16 MW
924517 AB2-100 E2 Adder 1.37 MW 1.16 MW
925595 AC1-034 E Adder 1.77 MW 1.5 MW
926206 AC1-098 E Adder 1.47 MW 1.25 MW
926214 AC1-099 E Adder 0.48 MW 0.41 MW
934065 AD1-033 E Adder 1.66 MW 1.41 MW
937226 AE2-253 E Adder 1.94 MW 1.65 MW
918512 AA1-065 E OP Adder 2.05 MW 1.74 MW
919153 AA1-139 E2 Adder 1.36 MW 1.16 MW
919152 AA1-139 E1 Adder 1.36 MW 1.16 MW
919710 AA2-057 E Adder 1.64 MW 1.4 MW
920692 AA2-178 E Adder 1.45 MW 1.24 MW
923994 AB2-040_E Adder 2.59 MW 2.2 MW
924022 AB2-043 E O1 Adder 1.63 MW 1.38 MW
924152 AB2-059 E OP Adder 1.86 MW 1.58 MW
924814 AB2-134 E Adder 6.73 MW 5.72 MW
316083 AB2-161 C 50/50 0.32 MW 0.32 MW
316084 AB2-161 E 50/50 3.2 MW 3.2 MW
925122 AB2-169 E Adder 2.04 MW 1.74 MW
316088 AB2-174 E Adder 2.78 MW 2.37 MW
932046 AC2-012 E Adder 4.46 MW 3.79 MW
316311 AC2-079 C Adder 2.56 MW 2.18 MW
932596 AC2-079 E Adder 4.18 MW 3.56 MW
316381 AD1-082 C 50/50 0.73 MW 0.73 MW
934576 AD1-082 E 50/50 2.55 MW 2.55 MW
316349 AD2-085 C Adder 1.57 MW 1.34 MW
936666 AD2-085 E Adder 2.57 MW 2.18 MW
961611 AG1-000B C Adder 7.32 MW 6.22 MW
941591 AE2-156 C Adder 6.08 MW 5.17 MW
944581 AF1-123 C Adder 14.95 MW 12.71 MW
944582 AF1-123 E Adder 34.23 MW 29.09 MW
944591 AF1-124 C Adder 15.0 MW 12.75 MW
944592 AF1-124 E Adder 34.35 MW 29.2 MW
944601 AF1-125 C Adder 14.72 MW 12.51 MW
944602 AF1-125 E Adder 33.69 MW 28.64 MW
962491 AG1-098 C Adder 3.44 MW 2.92 MW
962492 AG1-098 E Adder 2.29 MW 1.95 MW
964241 AG1-285 C Adder 3.93 MW 3.34 MW
964242 AG1-285 E Adder 2.62 MW 2.23 MW
965281 AG1-393 C 50/50 1.26 MW 1.26 MW
965282 AG1-393 E 50/50 0.84 MW 0.84 MW
313764 3SOCKMAN Adder 0.29 MW 0.25 MW
932632 AC2-084 E Adder 1.3 MW 1.1 MW
934321 AD1-056 C Adder 2.39 MW 2.03 MW
934322 AD1-056 E Adder 1.3 MW 1.1 MW
934331 AD1-057 C Adder 1.33 MW 1.13 MW
934332 AD1-057 E Adder 0.69 MW 0.59 MW
934501 AD1-074 C Adder 12.06 MW 10.25 MW
934502 AD1-074 E Adder 6.14 MW 5.22 MW
934511 AD1-075 C Adder 3.01 MW 2.56 MW
934512 AD1-075 E Adder 1.53 MW 1.3 MW
934612 AD1-087 E Adder 1.13 MW 0.96 MW
935161 AD1-151 C Adder 9.0 MW 7.65 MW
935162 AD1-151 E Adder 6.0 MW 5.1 MW
935172 AD1-152 E Adder 1.67 MW 1.42 MW
937482 AD2-202 E Adder 0.33 MW 0.28 MW
938531 AE1-072 C Adder 5.86 MW 4.98 MW
938532 AE1-072 E Adder 3.06 MW 2.6 MW
939191 AE1-149 C 50/50 7.12 MW 7.12 MW
939192 AE1-149 E 50/50 4.75 MW 4.75 MW
940431 AE2-027 C Adder 7.02 MW 5.97 MW
940432 AE2-027 E Adder 4.68 MW 3.98 MW
940481 AE2-033 C Adder 8.64 MW 7.34 MW
940482 AE2-033 E Adder 5.82 MW 4.95 MW
940541 AE2-040 C Adder 1.56 MW 1.32 MW
940641 AE2-051 C Adder 6.05 MW 5.14 MW
940642 AE2-051 E Adder 4.03 MW 3.43 MW
941101 AE2-104 C Adder 1.27 MW 1.08 MW
941102 AE2-104 E Adder 2.01 MW 1.71 MW
944641 AF1-129 C 50/50 120.11 MW 120.11 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 6.73 MW 6.73 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 5.61 MW 5.61 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 28.02 MW 28.02 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.93 MW 0.93 MW
NY PJM->LTFIMP_NY CLTF 0.44 MW 0.44 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.14 MW 0.14 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.51 MW 3.51 MW
TVA LTFEXP_TVA->PJM CLTF 1.57 MW 1.57 MW
MEC LTFEXP_MEC->PJM CLTF 0.92 MW 0.92 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.01 MW 2.01 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 5.92 MW 5.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.67 MW 1.67 MW

Details for 6VARINA-6CHARCTY 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6VARINA-6CHARCTY 230.0 kV Ckt 1 line
314260 to 314225 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 107.41 %
Rating: 984.18 MVA
Rating Type: B
MVA to Mitigate: 1057.1 MVA
MW Contribution: 48.41 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: DVP
Facility Description:
6VARINA-6CHARCTY 230.0 kV Ckt 1 line
314260 to 314225 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 103.82 %
Rating: 984.18 MVA
Rating Type: B
MVA to Mitigate: 1021.73 MVA
MW Contribution: 45.01 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.33 MW 0.28 MW
961672 AG1-007 E Adder 0.19 MW 0.16 MW
961941 AG1-037 C Adder 0.19 MW 0.16 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.76 MW 0.65 MW
962332 AG1-082 E Adder 0.51 MW 0.43 MW
963041 AG1-153 C Adder 1.97 MW 1.68 MW
963042 AG1-153 E Adder 2.96 MW 2.52 MW
966801 AG1-551 C Adder 0.74 MW 0.63 MW
966802 AG1-551 E Adder 0.39 MW 0.33 MW
966811 AG1-552 C Adder 0.82 MW 0.7 MW
966812 AG1-552 E Adder 0.39 MW 0.33 MW
965291 AG1-394 C Adder 0.33 MW 0.28 MW
965292 AG1-394 E Adder 0.61 MW 0.52 MW
966621 AG1-532 C Adder 0.62 MW 0.52 MW
966622 AG1-532 E Adder 0.41 MW 0.35 MW
314541 3WATKINS Adder 0.27 MW 0.23 MW
314572 3EMPORIA Adder 0.19 MW 0.16 MW
315131 1EDGECMA Adder 5.45 MW 4.63 MW
918492 AA1-063AE OP Adder 1.61 MW 1.37 MW
918532 AA1-067 E Adder 0.25 MW 0.21 MW
919692 AA2-053 E OP Adder 1.67 MW 1.42 MW
920042 AA2-088 E OP Adder 4.11 MW 3.49 MW
925785 AC1-054 E Adder 1.23 MW 1.04 MW
927146 AC1-208 E Adder 1.63 MW 1.38 MW
934521 AD1-076 C Adder 4.38 MW 3.72 MW
934522 AD1-076 E Adder 2.23 MW 1.9 MW
943172 AE2-346 E Adder 0.23 MW 0.2 MW
944011 AF1-069 C Adder 4.62 MW 3.93 MW
944012 AF1-069 E Adder 1.8 MW 1.53 MW
960081 AF2-299 C Adder 0.82 MW 0.7 MW
960082 AF2-299 E Adder 0.55 MW 0.47 MW
316141 AB2-099 E Adder 0.1 MW 0.08 MW
900672 V4-068 E Adder 0.14 MW 0.12 MW
917342 Z2-044 E Adder 0.25 MW 0.21 MW
922923 AB1-081 E OP Adder 1.32 MW 1.12 MW
923263 AB1-132 E OP Adder 2.58 MW 2.2 MW
923573 AB1-173 E OP Adder 1.38 MW 1.18 MW
924162 AB2-060 E OP Adder 1.33 MW 1.13 MW
924302 AB2-077 E O1 Adder 0.42 MW 0.36 MW
924312 AB2-078 E O1 Adder 0.42 MW 0.36 MW
924322 AB2-079 E O1 Adder 0.42 MW 0.36 MW
939181 AE1-148 C Adder 2.9 MW 2.46 MW
939182 AE1-148 E Adder 1.93 MW 1.64 MW
940492 AE2-034 E Adder 1.09 MW 0.93 MW
941031 AE2-094 C Adder 14.14 MW 12.02 MW
941032 AE2-094 E Adder 6.33 MW 5.38 MW
946281 AF1-292 C Adder 0.68 MW 0.58 MW
946282 AF1-292 E Adder 0.45 MW 0.39 MW
957481 AF2-042 C Adder 17.36 MW 14.76 MW
957482 AF2-042 E Adder 11.57 MW 9.84 MW
957521 AF2-046 C Adder 5.44 MW 4.62 MW
957522 AF2-046 E Adder 2.75 MW 2.33 MW
957861 AF2-080 C Adder 2.69 MW 2.29 MW
957862 AF2-080 E Adder 1.19 MW 1.01 MW
314539 3UNCAMP Adder 2.33 MW 1.98 MW
916042 Z1-036 E Adder 9.94 MW 8.45 MW
938771 AE1-103 C Adder 1.12 MW 0.95 MW
938772 AE1-103 E Adder 1.55 MW 1.31 MW
314331 6POE 50/50 1.08 MW 1.08 MW
314507 3THOMPSN Adder 0.69 MW 0.58 MW
314525 6KINGFORK Adder 0.36 MW 0.3 MW
314550 6HICKORY Adder 0.72 MW 0.61 MW
315065 1CHESTF6 50/50 23.03 MW 23.03 MW
315073 1STONECA 50/50 4.5 MW 4.5 MW
315076 1HOPPOLC 50/50 1.0 MW 1.0 MW
315077 1HOPHCF1 50/50 1.59 MW 1.59 MW
315078 1HOPHCF2 50/50 1.59 MW 1.59 MW
315079 1HOPHCF3 50/50 1.59 MW 1.59 MW
315080 1HOPHCF4 50/50 2.41 MW 2.41 MW
315083 1SPRUNCA Adder 2.67 MW 2.27 MW
315084 1SPRUNCB Adder 2.67 MW 2.27 MW
926662 AC1-147 E Adder 0.45 MW 0.38 MW
926755 AC1-161 E Adder 3.76 MW 3.19 MW
927226 AC1-216 E Adder 4.11 MW 3.49 MW
935112 AD1-144 E Adder 0.33 MW 0.28 MW
942341 AE2-247 C Adder 0.68 MW 0.58 MW
942342 AE2-247 E Adder 0.94 MW 0.8 MW
943461 AF1-017 C Adder 0.62 MW 0.53 MW
943462 AF1-017 E Adder 1.01 MW 0.86 MW
943612 AF1-032 E Adder 0.32 MW 0.27 MW
315260 1GOSPORTA Adder 0.72 MW 0.62 MW
315261 1GOSPORTB Adder 0.93 MW 0.79 MW
315262 1GOSPORTC Adder 0.79 MW 0.67 MW
316132 AB2-190 C 50/50 2.4 MW 2.4 MW
913392 Y1-086 E Adder 0.74 MW 0.63 MW
916192 Z1-068 E Adder 0.63 MW 0.54 MW
923832 AB2-022 E Adder 0.42 MW 0.36 MW
923852 AB2-025 E Adder 0.63 MW 0.54 MW
939312 AE1-162 E Adder 0.57 MW 0.48 MW
946262 AF1-291 E 50/50 1.63 MW 1.63 MW
957492 AF2-043 E Adder 0.49 MW 0.42 MW
901082 W1-029 E Adder 10.95 MW 9.3 MW
917122 Z2-027 E Adder 0.46 MW 0.39 MW
925332 AB2-190 E 50/50 4.68 MW 4.68 MW
925522 AC1-027 E Adder 0.41 MW 0.35 MW
942001 AE2-212 C 50/50 2.11 MW 2.11 MW
942002 AE2-212 E 50/50 1.41 MW 1.41 MW
957871 AF2-081 C Adder 3.32 MW 2.83 MW
957872 AF2-081 E Adder 1.42 MW 1.21 MW
958161 AF2-110 C Adder 0.52 MW 0.44 MW
958162 AF2-110 E Adder 0.82 MW 0.7 MW
917512 Z2-088 E OP1 Adder 1.72 MW 1.46 MW
926071 AC1-086 C Adder 8.88 MW 7.55 MW
926072 AC1-086 E Adder 4.04 MW 3.44 MW
927021 AC1-189 C Adder 2.96 MW 2.52 MW
927022 AC1-189 E Adder 1.47 MW 1.25 MW
933291 AC2-141 C Adder 8.8 MW 7.48 MW
933292 AC2-141 E Adder 3.76 MW 3.19 MW
934621 AD1-088 C Adder 3.87 MW 3.29 MW
934622 AD1-088 E Adder 1.82 MW 1.55 MW
939411 AE1-173 C Adder 31.3 MW 26.61 MW
939412 AE1-173 E Adder 20.87 MW 17.74 MW
934012 AD1-025 E Adder 5.32 MW 4.52 MW
933981 AD1-022 C Adder 3.16 MW 2.69 MW
933982 AD1-022 E Adder 1.72 MW 1.46 MW
962572 AG1-106 E Adder 0.5 MW 0.43 MW
961681 AG1-008 C Adder 5.44 MW 4.62 MW
961682 AG1-008 E Adder 2.75 MW 2.33 MW
962571 AG1-106 C Adder 1.15 MW 0.98 MW
314594 6PLYMOUTH TP Adder 0.12 MW 0.1 MW
314632 6AYDLETT TAP Adder 0.45 MW 0.39 MW
316240 AF1-291 C 50/50 2.44 MW 2.44 MW
316263 AC1-034 C Adder 2.34 MW 1.99 MW
316274 AC1-208 C Adder 3.66 MW 3.12 MW
917332 KELFORD E Adder 0.63 MW 0.54 MW
924516 AB2-100 E1 Adder 1.37 MW 1.16 MW
924517 AB2-100 E2 Adder 1.37 MW 1.16 MW
925595 AC1-034 E Adder 1.77 MW 1.5 MW
926206 AC1-098 E Adder 1.47 MW 1.25 MW
926214 AC1-099 E Adder 0.48 MW 0.41 MW
934065 AD1-033 E Adder 1.66 MW 1.41 MW
937226 AE2-253 E Adder 1.94 MW 1.65 MW
918512 AA1-065 E OP Adder 2.05 MW 1.74 MW
919153 AA1-139 E2 Adder 1.36 MW 1.16 MW
919152 AA1-139 E1 Adder 1.36 MW 1.16 MW
919710 AA2-057 E Adder 1.64 MW 1.4 MW
920692 AA2-178 E Adder 1.45 MW 1.24 MW
923994 AB2-040_E Adder 2.59 MW 2.2 MW
924022 AB2-043 E O1 Adder 1.63 MW 1.38 MW
924152 AB2-059 E OP Adder 1.86 MW 1.58 MW
924814 AB2-134 E Adder 6.73 MW 5.72 MW
316083 AB2-161 C 50/50 0.32 MW 0.32 MW
316084 AB2-161 E 50/50 3.2 MW 3.2 MW
925122 AB2-169 E Adder 2.04 MW 1.74 MW
316088 AB2-174 E Adder 2.78 MW 2.37 MW
932046 AC2-012 E Adder 4.46 MW 3.79 MW
316311 AC2-079 C Adder 2.56 MW 2.18 MW
932596 AC2-079 E Adder 4.18 MW 3.56 MW
316381 AD1-082 C 50/50 0.73 MW 0.73 MW
934576 AD1-082 E 50/50 2.55 MW 2.55 MW
316349 AD2-085 C Adder 1.57 MW 1.34 MW
936666 AD2-085 E Adder 2.57 MW 2.18 MW
961611 AG1-000B C Adder 7.32 MW 6.22 MW
941591 AE2-156 C Adder 6.08 MW 5.17 MW
944581 AF1-123 C Adder 14.95 MW 12.71 MW
944582 AF1-123 E Adder 34.23 MW 29.09 MW
944591 AF1-124 C Adder 15.0 MW 12.75 MW
944592 AF1-124 E Adder 34.35 MW 29.2 MW
944601 AF1-125 C Adder 14.72 MW 12.51 MW
944602 AF1-125 E Adder 33.69 MW 28.64 MW
962491 AG1-098 C Adder 3.44 MW 2.92 MW
962492 AG1-098 E Adder 2.29 MW 1.95 MW
964241 AG1-285 C Adder 3.93 MW 3.34 MW
964242 AG1-285 E Adder 2.62 MW 2.23 MW
965281 AG1-393 C 50/50 1.26 MW 1.26 MW
965282 AG1-393 E 50/50 0.84 MW 0.84 MW
313764 3SOCKMAN Adder 0.29 MW 0.25 MW
932632 AC2-084 E Adder 1.3 MW 1.1 MW
934321 AD1-056 C Adder 2.39 MW 2.03 MW
934322 AD1-056 E Adder 1.3 MW 1.1 MW
934331 AD1-057 C Adder 1.33 MW 1.13 MW
934332 AD1-057 E Adder 0.69 MW 0.59 MW
934501 AD1-074 C Adder 12.06 MW 10.25 MW
934502 AD1-074 E Adder 6.14 MW 5.22 MW
934511 AD1-075 C Adder 3.01 MW 2.56 MW
934512 AD1-075 E Adder 1.53 MW 1.3 MW
934612 AD1-087 E Adder 1.13 MW 0.96 MW
935161 AD1-151 C Adder 9.0 MW 7.65 MW
935162 AD1-151 E Adder 6.0 MW 5.1 MW
935172 AD1-152 E Adder 1.67 MW 1.42 MW
937482 AD2-202 E Adder 0.33 MW 0.28 MW
938531 AE1-072 C Adder 5.86 MW 4.98 MW
938532 AE1-072 E Adder 3.06 MW 2.6 MW
939191 AE1-149 C 50/50 7.12 MW 7.12 MW
939192 AE1-149 E 50/50 4.75 MW 4.75 MW
940431 AE2-027 C Adder 7.02 MW 5.97 MW
940432 AE2-027 E Adder 4.68 MW 3.98 MW
940481 AE2-033 C Adder 8.64 MW 7.34 MW
940482 AE2-033 E Adder 5.82 MW 4.95 MW
940541 AE2-040 C Adder 1.56 MW 1.32 MW
940641 AE2-051 C Adder 6.05 MW 5.14 MW
940642 AE2-051 E Adder 4.03 MW 3.43 MW
941101 AE2-104 C Adder 1.27 MW 1.08 MW
941102 AE2-104 E Adder 2.01 MW 1.71 MW
944641 AF1-129 C 50/50 120.11 MW 120.11 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 6.73 MW 6.73 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 5.61 MW 5.61 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 28.02 MW 28.02 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.93 MW 0.93 MW
NY PJM->LTFIMP_NY CLTF 0.44 MW 0.44 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.14 MW 0.14 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.51 MW 3.51 MW
TVA LTFEXP_TVA->PJM CLTF 1.57 MW 1.57 MW
MEC LTFEXP_MEC->PJM CLTF 0.92 MW 0.92 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.01 MW 2.01 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 5.92 MW 5.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.67 MW 1.67 MW

Details for 6CHARCTY-6LAKESIDE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6CHARCTY-6LAKESIDE 230.0 kV Ckt 1 line
314225 to 314227 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 103.84 %
Rating: 984.18 MVA
Rating Type: B
MVA to Mitigate: 1021.97 MVA
MW Contribution: 48.41 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: DVP
Facility Description:
6CHARCTY-6LAKESIDE 230.0 kV Ckt 1 line
314225 to 314227 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 100.23 %
Rating: 984.18 MVA
Rating Type: B
MVA to Mitigate: 986.44 MVA
MW Contribution: 45.01 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961671 AG1-007 C Adder 0.33 MW 0.28 MW
961672 AG1-007 E Adder 0.19 MW 0.16 MW
961941 AG1-037 C Adder 0.19 MW 0.16 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.76 MW 0.65 MW
962332 AG1-082 E Adder 0.51 MW 0.43 MW
963041 AG1-153 C Adder 1.97 MW 1.68 MW
963042 AG1-153 E Adder 2.96 MW 2.52 MW
966801 AG1-551 C Adder 0.74 MW 0.63 MW
966802 AG1-551 E Adder 0.39 MW 0.33 MW
966811 AG1-552 C Adder 0.82 MW 0.7 MW
966812 AG1-552 E Adder 0.39 MW 0.33 MW
965291 AG1-394 C Adder 0.33 MW 0.28 MW
965292 AG1-394 E Adder 0.61 MW 0.52 MW
966621 AG1-532 C Adder 0.62 MW 0.52 MW
966622 AG1-532 E Adder 0.41 MW 0.35 MW
314541 3WATKINS Adder 0.27 MW 0.23 MW
314572 3EMPORIA Adder 0.19 MW 0.16 MW
315131 1EDGECMA Adder 5.45 MW 4.63 MW
918492 AA1-063AE OP Adder 1.61 MW 1.37 MW
918532 AA1-067 E Adder 0.25 MW 0.21 MW
919692 AA2-053 E OP Adder 1.67 MW 1.42 MW
920042 AA2-088 E OP Adder 4.11 MW 3.49 MW
925785 AC1-054 E Adder 1.23 MW 1.04 MW
927146 AC1-208 E Adder 1.63 MW 1.38 MW
934521 AD1-076 C Adder 4.38 MW 3.72 MW
934522 AD1-076 E Adder 2.23 MW 1.9 MW
943172 AE2-346 E Adder 0.23 MW 0.2 MW
944011 AF1-069 C Adder 4.62 MW 3.93 MW
944012 AF1-069 E Adder 1.8 MW 1.53 MW
960081 AF2-299 C Adder 0.82 MW 0.7 MW
960082 AF2-299 E Adder 0.55 MW 0.47 MW
316141 AB2-099 E Adder 0.1 MW 0.08 MW
900672 V4-068 E Adder 0.14 MW 0.12 MW
917342 Z2-044 E Adder 0.25 MW 0.21 MW
922923 AB1-081 E OP Adder 1.32 MW 1.12 MW
923263 AB1-132 E OP Adder 2.58 MW 2.2 MW
923573 AB1-173 E OP Adder 1.38 MW 1.18 MW
924162 AB2-060 E OP Adder 1.33 MW 1.13 MW
924302 AB2-077 E O1 Adder 0.42 MW 0.36 MW
924312 AB2-078 E O1 Adder 0.42 MW 0.36 MW
924322 AB2-079 E O1 Adder 0.42 MW 0.36 MW
939181 AE1-148 C Adder 2.9 MW 2.46 MW
939182 AE1-148 E Adder 1.93 MW 1.64 MW
940492 AE2-034 E Adder 1.09 MW 0.93 MW
941031 AE2-094 C Adder 14.14 MW 12.02 MW
941032 AE2-094 E Adder 6.33 MW 5.38 MW
946281 AF1-292 C Adder 0.68 MW 0.58 MW
946282 AF1-292 E Adder 0.45 MW 0.39 MW
957481 AF2-042 C Adder 17.36 MW 14.76 MW
957482 AF2-042 E Adder 11.57 MW 9.84 MW
957521 AF2-046 C Adder 5.44 MW 4.62 MW
957522 AF2-046 E Adder 2.75 MW 2.33 MW
957861 AF2-080 C Adder 2.69 MW 2.29 MW
957862 AF2-080 E Adder 1.19 MW 1.01 MW
314539 3UNCAMP Adder 2.33 MW 1.98 MW
916042 Z1-036 E Adder 9.94 MW 8.45 MW
938771 AE1-103 C Adder 1.12 MW 0.95 MW
938772 AE1-103 E Adder 1.55 MW 1.31 MW
314331 6POE 50/50 1.08 MW 1.08 MW
314507 3THOMPSN Adder 0.69 MW 0.58 MW
314525 6KINGFORK Adder 0.36 MW 0.3 MW
314550 6HICKORY Adder 0.72 MW 0.61 MW
315065 1CHESTF6 50/50 23.03 MW 23.03 MW
315073 1STONECA 50/50 4.5 MW 4.5 MW
315076 1HOPPOLC 50/50 1.0 MW 1.0 MW
315077 1HOPHCF1 50/50 1.59 MW 1.59 MW
315078 1HOPHCF2 50/50 1.59 MW 1.59 MW
315079 1HOPHCF3 50/50 1.59 MW 1.59 MW
315080 1HOPHCF4 50/50 2.41 MW 2.41 MW
315083 1SPRUNCA Adder 2.67 MW 2.27 MW
315084 1SPRUNCB Adder 2.67 MW 2.27 MW
926662 AC1-147 E Adder 0.45 MW 0.38 MW
926755 AC1-161 E Adder 3.76 MW 3.19 MW
927226 AC1-216 E Adder 4.11 MW 3.49 MW
935112 AD1-144 E Adder 0.33 MW 0.28 MW
942341 AE2-247 C Adder 0.68 MW 0.58 MW
942342 AE2-247 E Adder 0.94 MW 0.8 MW
943461 AF1-017 C Adder 0.62 MW 0.53 MW
943462 AF1-017 E Adder 1.01 MW 0.86 MW
943612 AF1-032 E Adder 0.32 MW 0.27 MW
315260 1GOSPORTA Adder 0.72 MW 0.62 MW
315261 1GOSPORTB Adder 0.93 MW 0.79 MW
315262 1GOSPORTC Adder 0.79 MW 0.67 MW
316132 AB2-190 C 50/50 2.4 MW 2.4 MW
913392 Y1-086 E Adder 0.74 MW 0.63 MW
916192 Z1-068 E Adder 0.63 MW 0.54 MW
923832 AB2-022 E Adder 0.42 MW 0.36 MW
923852 AB2-025 E Adder 0.63 MW 0.54 MW
939312 AE1-162 E Adder 0.57 MW 0.48 MW
946262 AF1-291 E 50/50 1.63 MW 1.63 MW
957492 AF2-043 E Adder 0.49 MW 0.42 MW
901082 W1-029 E Adder 10.95 MW 9.3 MW
917122 Z2-027 E Adder 0.46 MW 0.39 MW
925332 AB2-190 E 50/50 4.68 MW 4.68 MW
925522 AC1-027 E Adder 0.41 MW 0.35 MW
942001 AE2-212 C 50/50 2.11 MW 2.11 MW
942002 AE2-212 E 50/50 1.41 MW 1.41 MW
957871 AF2-081 C Adder 3.32 MW 2.83 MW
957872 AF2-081 E Adder 1.42 MW 1.21 MW
958161 AF2-110 C Adder 0.52 MW 0.44 MW
958162 AF2-110 E Adder 0.82 MW 0.7 MW
917512 Z2-088 E OP1 Adder 1.72 MW 1.46 MW
926071 AC1-086 C Adder 8.88 MW 7.55 MW
926072 AC1-086 E Adder 4.04 MW 3.44 MW
927021 AC1-189 C Adder 2.96 MW 2.52 MW
927022 AC1-189 E Adder 1.47 MW 1.25 MW
933291 AC2-141 C Adder 8.8 MW 7.48 MW
933292 AC2-141 E Adder 3.76 MW 3.19 MW
934621 AD1-088 C Adder 3.87 MW 3.29 MW
934622 AD1-088 E Adder 1.82 MW 1.55 MW
939411 AE1-173 C Adder 31.3 MW 26.61 MW
939412 AE1-173 E Adder 20.87 MW 17.74 MW
934012 AD1-025 E Adder 5.32 MW 4.52 MW
933981 AD1-022 C Adder 3.16 MW 2.69 MW
933982 AD1-022 E Adder 1.72 MW 1.46 MW
962572 AG1-106 E Adder 0.5 MW 0.43 MW
961681 AG1-008 C Adder 5.44 MW 4.62 MW
961682 AG1-008 E Adder 2.75 MW 2.33 MW
962571 AG1-106 C Adder 1.15 MW 0.98 MW
314594 6PLYMOUTH TP Adder 0.12 MW 0.1 MW
314632 6AYDLETT TAP Adder 0.45 MW 0.39 MW
316240 AF1-291 C 50/50 2.44 MW 2.44 MW
316263 AC1-034 C Adder 2.34 MW 1.99 MW
316274 AC1-208 C Adder 3.66 MW 3.12 MW
917332 KELFORD E Adder 0.63 MW 0.54 MW
924516 AB2-100 E1 Adder 1.37 MW 1.16 MW
924517 AB2-100 E2 Adder 1.37 MW 1.16 MW
925595 AC1-034 E Adder 1.77 MW 1.5 MW
926206 AC1-098 E Adder 1.47 MW 1.25 MW
926214 AC1-099 E Adder 0.48 MW 0.41 MW
934065 AD1-033 E Adder 1.66 MW 1.41 MW
937226 AE2-253 E Adder 1.94 MW 1.65 MW
918512 AA1-065 E OP Adder 2.05 MW 1.74 MW
919153 AA1-139 E2 Adder 1.36 MW 1.16 MW
919152 AA1-139 E1 Adder 1.36 MW 1.16 MW
919710 AA2-057 E Adder 1.64 MW 1.4 MW
920692 AA2-178 E Adder 1.45 MW 1.24 MW
923994 AB2-040_E Adder 2.59 MW 2.2 MW
924022 AB2-043 E O1 Adder 1.63 MW 1.38 MW
924152 AB2-059 E OP Adder 1.86 MW 1.58 MW
924814 AB2-134 E Adder 6.73 MW 5.72 MW
316083 AB2-161 C 50/50 0.32 MW 0.32 MW
316084 AB2-161 E 50/50 3.2 MW 3.2 MW
925122 AB2-169 E Adder 2.04 MW 1.74 MW
316088 AB2-174 E Adder 2.78 MW 2.37 MW
932046 AC2-012 E Adder 4.46 MW 3.79 MW
316311 AC2-079 C Adder 2.56 MW 2.18 MW
932596 AC2-079 E Adder 4.18 MW 3.56 MW
316381 AD1-082 C 50/50 0.73 MW 0.73 MW
934576 AD1-082 E 50/50 2.55 MW 2.55 MW
316349 AD2-085 C Adder 1.57 MW 1.34 MW
936666 AD2-085 E Adder 2.57 MW 2.18 MW
961611 AG1-000B C Adder 7.32 MW 6.22 MW
941591 AE2-156 C Adder 6.08 MW 5.17 MW
944581 AF1-123 C Adder 14.95 MW 12.71 MW
944582 AF1-123 E Adder 34.23 MW 29.09 MW
944591 AF1-124 C Adder 15.0 MW 12.75 MW
944592 AF1-124 E Adder 34.35 MW 29.2 MW
944601 AF1-125 C Adder 14.72 MW 12.51 MW
944602 AF1-125 E Adder 33.69 MW 28.64 MW
962491 AG1-098 C Adder 3.44 MW 2.92 MW
962492 AG1-098 E Adder 2.29 MW 1.95 MW
964241 AG1-285 C Adder 3.93 MW 3.34 MW
964242 AG1-285 E Adder 2.62 MW 2.23 MW
965281 AG1-393 C 50/50 1.26 MW 1.26 MW
965282 AG1-393 E 50/50 0.84 MW 0.84 MW
313764 3SOCKMAN Adder 0.29 MW 0.25 MW
932632 AC2-084 E Adder 1.3 MW 1.1 MW
934321 AD1-056 C Adder 2.39 MW 2.03 MW
934322 AD1-056 E Adder 1.3 MW 1.1 MW
934331 AD1-057 C Adder 1.33 MW 1.13 MW
934332 AD1-057 E Adder 0.69 MW 0.59 MW
934501 AD1-074 C Adder 12.06 MW 10.25 MW
934502 AD1-074 E Adder 6.14 MW 5.22 MW
934511 AD1-075 C Adder 3.01 MW 2.56 MW
934512 AD1-075 E Adder 1.53 MW 1.3 MW
934612 AD1-087 E Adder 1.13 MW 0.96 MW
935161 AD1-151 C Adder 9.0 MW 7.65 MW
935162 AD1-151 E Adder 6.0 MW 5.1 MW
935172 AD1-152 E Adder 1.67 MW 1.42 MW
937482 AD2-202 E Adder 0.33 MW 0.28 MW
938531 AE1-072 C Adder 5.86 MW 4.98 MW
938532 AE1-072 E Adder 3.06 MW 2.6 MW
939191 AE1-149 C 50/50 7.12 MW 7.12 MW
939192 AE1-149 E 50/50 4.75 MW 4.75 MW
940431 AE2-027 C Adder 7.02 MW 5.97 MW
940432 AE2-027 E Adder 4.68 MW 3.98 MW
940481 AE2-033 C Adder 8.64 MW 7.34 MW
940482 AE2-033 E Adder 5.82 MW 4.95 MW
940541 AE2-040 C Adder 1.56 MW 1.32 MW
940641 AE2-051 C Adder 6.05 MW 5.14 MW
940642 AE2-051 E Adder 4.03 MW 3.43 MW
941101 AE2-104 C Adder 1.27 MW 1.08 MW
941102 AE2-104 E Adder 2.01 MW 1.71 MW
944641 AF1-129 C 50/50 120.11 MW 120.11 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 6.73 MW 6.73 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 5.61 MW 5.61 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 28.02 MW 28.02 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.93 MW 0.93 MW
NY PJM->LTFIMP_NY CLTF 0.44 MW 0.44 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.14 MW 0.14 MW
CPLE LTFEXP_CPLE->PJM CLTF 3.51 MW 3.51 MW
TVA LTFEXP_TVA->PJM CLTF 1.57 MW 1.57 MW
MEC LTFEXP_MEC->PJM CLTF 0.92 MW 0.92 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.01 MW 2.01 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 5.92 MW 5.92 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 1.67 MW 1.67 MW

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 120.45 %
Rating: 678.68 MVA
Rating Type: A
MVA to Mitigate: 817.5 MVA
MW Contribution: 161.24 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
313526 AB2-022 C 50/50 0.24 MW 0.24 MW
314507 3THOMPSN Adder -1.63 MW -1.38 MW
314550 6HICKORY 50/50 2.31 MW 2.31 MW
913392 Y1-086 E 50/50 1.38 MW 1.38 MW
923832 AB2-022 E 50/50 0.78 MW 0.78 MW
917122 Z2-027 E Adder 0.69 MW 0.59 MW
957871 AF2-081 C 50/50 9.21 MW 9.21 MW
957872 AF2-081 E 50/50 3.95 MW 3.95 MW
314632 6AYDLETT TAP 50/50 1.15 MW 1.15 MW
316185 AD1-033 C 50/50 1.01 MW 1.01 MW
316320 Y1-086 C 50/50 0.14 MW 0.14 MW
934065 AD1-033 E 50/50 4.11 MW 4.11 MW
937226 AE2-253 E 50/50 5.69 MW 5.69 MW
316017 AA1-139 ULT1 50/50 1.0 MW 1.0 MW
316018 AA1-139 ULT2 50/50 1.0 MW 1.0 MW
919153 AA1-139 E2 50/50 3.77 MW 3.77 MW
919152 AA1-139 E1 50/50 3.77 MW 3.77 MW
316388 AE2-253 GEN 50/50 1.91 MW 1.91 MW
944581 AF1-123 C 50/50 49.79 MW 49.79 MW
944582 AF1-123 E 50/50 114.01 MW 114.01 MW
944591 AF1-124 C 50/50 49.96 MW 49.96 MW
944592 AF1-124 E 50/50 114.42 MW 114.42 MW
944601 AF1-125 C 50/50 49.02 MW 49.02 MW
944602 AF1-125 E 50/50 112.22 MW 112.22 MW
938531 AE1-072 C 50/50 15.22 MW 15.22 MW
938532 AE1-072 E 50/50 7.93 MW 7.93 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.06 MW 0.06 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.16 MW 1.16 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.51 MW 0.51 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 1.16 MW 1.16 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.1 MW 0.1 MW
VTF LTFEXP_VFT->PJM CMTX 0.26 MW 0.26 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.04 MW 0.04 MW
WEC LTFEXP_WEC->PJM CLTF 0.02 MW 0.02 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.11 MW 0.11 MW
TVA LTFEXP_TVA->PJM CLTF 0.12 MW 0.12 MW
MEC LTFEXP_MEC->PJM CLTF 0.12 MW 0.12 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.15 MW 0.15 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.05 MW 0.05 MW

Details for 8LADYSMITH-8KRAKEN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 581_SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
8LADYSMITH-8KRAKEN 500.0 kV Ckt 1 line
314911 to 313483 ckt 1
Contingency Name:
DVP_P1-2: LN 581_SRT-S
CONTINGENCY 'DVP_P1-2: LN 581_SRT-S'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2831 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2552 BRANCH FROM BUS 314900 TO BUS 314905 CKT 1 /*8BRISTER     500.0 - 8CHANCE      500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 114.52 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3688.11 MVA
MW Contribution: 157.9 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.49 MW 0.42 MW
961942 AG1-037 E Adder 0.33 MW 0.28 MW
962331 AG1-082 C Adder 1.97 MW 1.67 MW
962332 AG1-082 E Adder 1.31 MW 1.11 MW
965291 AG1-394 C Adder 0.84 MW 0.72 MW
965292 AG1-394 E Adder 1.55 MW 1.32 MW
314541 3WATKINS Adder 0.7 MW 0.6 MW
920042 AA2-088 E OP Adder 10.51 MW 8.93 MW
934521 AD1-076 C Adder 12.18 MW 10.35 MW
934522 AD1-076 E Adder 6.21 MW 5.28 MW
943172 AE2-346 E Adder 0.59 MW 0.5 MW
316141 AB2-099 E Adder 0.25 MW 0.21 MW
900672 V4-068 E Adder 0.35 MW 0.3 MW
940492 AE2-034 E Adder 3.12 MW 2.65 MW
941031 AE2-094 C Adder 16.13 MW 13.71 MW
957521 AF2-046 C Adder 13.91 MW 11.83 MW
957522 AF2-046 E Adder 7.03 MW 5.98 MW
314539 3UNCAMP Adder 6.24 MW 5.31 MW
916042 Z1-036 E Adder 29.54 MW 25.11 MW
938771 AE1-103 C Adder 3.03 MW 2.57 MW
938772 AE1-103 E Adder 4.18 MW 3.55 MW
314229 6MT RD221 50/50 0.16 MW 0.16 MW
314236 6NRTHEST 50/50 0.23 MW 0.23 MW
314331 6POE Adder 1.46 MW 1.24 MW
314507 3THOMPSN Adder 2.18 MW 1.86 MW
314525 6KINGFORK Adder 1.1 MW 0.94 MW
314550 6HICKORY Adder 2.34 MW 1.99 MW
315039 1LDYSMT3 50/50 7.22 MW 7.22 MW
315040 1LDYSMT4 50/50 7.24 MW 7.24 MW
315041 1LDYSMT5 50/50 7.26 MW 7.26 MW
315060 1CHESTF5 Adder 77.5 MW 65.88 MW
315065 1CHESTF6 Adder 22.98 MW 19.54 MW
315070 1DARBY 4 50/50 3.26 MW 3.26 MW
315073 1STONECA Adder 8.14 MW 6.92 MW
315083 1SPRUNCA Adder 10.58 MW 8.99 MW
315084 1SPRUNCB Adder 10.58 MW 8.99 MW
315092 1YORKTN3 Adder 153.85 MW 130.77 MW
925865 AC1-065 E Adder 19.89 MW 16.91 MW
926412 AC1-112 E 50/50 1.48 MW 1.48 MW
926472 AC1-118 E Adder 1.22 MW 1.03 MW
926662 AC1-147 E Adder 1.43 MW 1.22 MW
926755 AC1-161 E Adder 14.08 MW 11.97 MW
927226 AC1-216 E Adder 8.91 MW 7.58 MW
934392 AD1-063 E Adder 1.29 MW 1.09 MW
934782 AD1-105 E Adder 6.11 MW 5.2 MW
935112 AD1-144 E Adder 1.03 MW 0.87 MW
936582 AD2-073 E Adder 1.24 MW 1.06 MW
936591 AD2-074 C Adder 6.59 MW 5.6 MW
936592 AD2-074 E Adder 10.75 MW 9.13 MW
942341 AE2-247 C Adder 1.61 MW 1.37 MW
942342 AE2-247 E Adder 2.22 MW 1.89 MW
943461 AF1-017 C Adder 1.45 MW 1.24 MW
943462 AF1-017 E Adder 2.37 MW 2.02 MW
943612 AF1-032 E Adder 0.99 MW 0.84 MW
943741 AF1-042 C Adder 3.45 MW 2.93 MW
943742 AF1-042 E Adder 5.62 MW 4.78 MW
961951 AG1-038 C Adder 3.81 MW 3.24 MW
961952 AG1-038 E Adder 5.26 MW 4.47 MW
966661 AG1-536 C Adder 6.36 MW 5.41 MW
966662 AG1-536 E Adder 8.55 MW 7.26 MW
966871 AG1-558 C 50/50 3.19 MW 3.19 MW
966872 AG1-558 E 50/50 1.6 MW 1.6 MW
966881 AG1-559 C 50/50 3.58 MW 3.58 MW
966882 AG1-559 E 50/50 1.8 MW 1.8 MW
315260 1GOSPORTA Adder 2.3 MW 1.96 MW
315261 1GOSPORTB Adder 2.94 MW 2.5 MW
315262 1GOSPORTC Adder 2.5 MW 2.12 MW
316076 AC2-137 E Adder 1.68 MW 1.43 MW
316078 AC2-138 E Adder 1.1 MW 0.94 MW
316157 AD2-030 E Adder 1.41 MW 1.2 MW
913392 Y1-086 E Adder 2.33 MW 1.98 MW
916192 Z1-068 E Adder 2.03 MW 1.72 MW
923832 AB2-022 E Adder 1.32 MW 1.12 MW
923842 AB2-024 E Adder 2.17 MW 1.84 MW
923852 AB2-025 E Adder 1.11 MW 0.94 MW
930122 AB1-027 E 50/50 1.82 MW 1.82 MW
938552 AE1-074 E Adder 1.32 MW 1.12 MW
939312 AE1-162 E Adder 1.59 MW 1.35 MW
946262 AF1-291 E Adder 1.67 MW 1.42 MW
957411 AF2-035 C 50/50 12.93 MW 12.93 MW
957412 AF2-035 E 50/50 6.47 MW 6.47 MW
957492 AF2-043 E Adder 1.52 MW 1.29 MW
957601 AF2-054 C Adder 2.52 MW 2.14 MW
957602 AF2-054 E Adder 1.68 MW 1.43 MW
962861 AG1-135 C Adder 7.18 MW 6.1 MW
962862 AG1-135 E Adder 4.79 MW 4.07 MW
962962 AG1-145 E Adder 1.73 MW 1.47 MW
962971 AG1-146 C Adder 3.66 MW 3.11 MW
962972 AG1-146 E Adder 2.44 MW 2.07 MW
962981 AG1-147 C Adder 8.53 MW 7.25 MW
962982 AG1-147 E Adder 5.69 MW 4.84 MW
963051 AG1-154 C 50/50 5.53 MW 5.53 MW
963052 AG1-154 E 50/50 8.3 MW 8.3 MW
963611 AG1-210 C Adder 0.79 MW 0.67 MW
963612 AG1-210 E Adder 1.18 MW 1.0 MW
964211 AG1-282 C Adder 2.4 MW 2.04 MW
964212 AG1-282 E Adder 1.6 MW 1.36 MW
901082 W1-029 E Adder 33.57 MW 28.53 MW
917122 Z2-027 E Adder 1.42 MW 1.21 MW
925332 AB2-190 E Adder 9.4 MW 7.99 MW
925522 AC1-027 E Adder 1.31 MW 1.12 MW
942001 AE2-212 C Adder 2.43 MW 2.07 MW
942002 AE2-212 E Adder 1.62 MW 1.38 MW
957832 AF2-077 E Adder 1.68 MW 1.42 MW
957871 AF2-081 C Adder 10.68 MW 9.08 MW
957872 AF2-081 E Adder 4.58 MW 3.89 MW
958161 AF2-110 C Adder 1.46 MW 1.24 MW
958162 AF2-110 E Adder 2.32 MW 1.97 MW
313811 6ELKO L286 Adder 1.75 MW 1.49 MW
314181 3NORNECK Adder 1.05 MW 0.89 MW
933291 AC2-141 C Adder 32.98 MW 28.04 MW
933292 AC2-141 E Adder 14.08 MW 11.97 MW
939411 AE1-173 C Adder 85.03 MW 72.28 MW
939412 AE1-173 E Adder 56.69 MW 48.19 MW
934012 AD1-025 E Adder 11.54 MW 9.81 MW
927041 AC1-191 C 50/50 12.79 MW 12.79 MW
927042 AC1-191 E 50/50 6.37 MW 6.37 MW
933981 AD1-022 C Adder 8.66 MW 7.37 MW
933982 AD1-022 E Adder 4.72 MW 4.01 MW
961681 AG1-008 C Adder 13.91 MW 11.83 MW
961682 AG1-008 E Adder 7.03 MW 5.98 MW
313053 6PAPERMILL Adder 8.0 MW 6.8 MW
314594 6PLYMOUTH TP Adder 0.32 MW 0.27 MW
314632 6AYDLETT TAP Adder 1.45 MW 1.23 MW
316004 AC1-112 C 50/50 0.43 MW 0.43 MW
316160 AE1-175 E Adder 1.42 MW 1.21 MW
316169 AC1-164 GEN Adder 50.64 MW 43.04 MW
316233 AE1-074 C Adder 2.62 MW 2.23 MW
316240 AF1-291 C Adder 2.51 MW 2.13 MW
316312 AB1-027 C 50/50 0.69 MW 0.69 MW
924516 AB2-100 E1 Adder 2.7 MW 2.3 MW
924517 AB2-100 E2 Adder 2.7 MW 2.3 MW
926785 AC1-164_E Adder 22.75 MW 19.34 MW
934065 AD1-033 E Adder 5.39 MW 4.58 MW
937226 AE2-253 E Adder 6.25 MW 5.32 MW
939612 AE1-191 E Adder 6.79 MW 5.77 MW
315037 1LDYSMT1 50/50 6.95 MW 6.95 MW
315038 1LDYSMT2 50/50 7.04 MW 7.04 MW
315051 AA1-145 CT1 50/50 7.04 MW 7.04 MW
315052 AA1-145 CT2 50/50 7.04 MW 7.04 MW
939246 AE1-155 E Adder 10.29 MW 8.75 MW
918512 AA1-065 E OP Adder 5.37 MW 4.57 MW
919153 AA1-139 E2 Adder 4.37 MW 3.71 MW
919152 AA1-139 E1 Adder 4.37 MW 3.71 MW
920692 AA2-178 E Adder 4.16 MW 3.54 MW
924814 AB2-134 E Adder 14.6 MW 12.41 MW
316084 AB2-161 E Adder 6.04 MW 5.13 MW
932046 AC2-012 E Adder 14.18 MW 12.06 MW
316311 AC2-079 C Adder 6.17 MW 5.25 MW
932596 AC2-079 E Adder 10.07 MW 8.56 MW
934146 AD1-041 E Adder 4.24 MW 3.61 MW
934576 AD1-082 E Adder 4.81 MW 4.09 MW
316349 AD2-085 C Adder 3.71 MW 3.15 MW
936666 AD2-085 E Adder 6.05 MW 5.14 MW
961611 AG1-000B C Adder 18.12 MW 15.4 MW
941591 AE2-156 C Adder 19.38 MW 16.47 MW
944581 AF1-123 C Adder 48.76 MW 41.44 MW
944582 AF1-123 E Adder 111.64 MW 94.9 MW
944591 AF1-124 C Adder 48.93 MW 41.59 MW
944592 AF1-124 E Adder 112.05 MW 95.24 MW
944601 AF1-125 C Adder 48.0 MW 40.8 MW
944602 AF1-125 E Adder 109.89 MW 93.41 MW
944631 AF1-128 C Adder 48.49 MW 41.22 MW
958261 AF2-120 C Adder 7.39 MW 6.28 MW
958262 AF2-120 E Adder 4.93 MW 4.19 MW
965281 AG1-393 C Adder 2.47 MW 2.1 MW
965282 AG1-393 E Adder 1.64 MW 1.4 MW
934501 AD1-074 C Adder 33.53 MW 28.5 MW
934502 AD1-074 E Adder 17.07 MW 14.51 MW
934511 AD1-075 C Adder 8.38 MW 7.12 MW
934512 AD1-075 E Adder 4.27 MW 3.63 MW
935161 AD1-151 C Adder 18.71 MW 15.91 MW
935162 AD1-151 E Adder 12.48 MW 10.6 MW
938531 AE1-072 C Adder 18.76 MW 15.94 MW
938532 AE1-072 E Adder 9.78 MW 8.31 MW
939191 AE1-149 C Adder 11.83 MW 10.06 MW
939192 AE1-149 E Adder 7.89 MW 6.71 MW
939261 AE1-157 C 50/50 21.17 MW 21.17 MW
939262 AE1-157 E 50/50 11.48 MW 11.48 MW
939602 AE1-190 E Adder 1.7 MW 1.44 MW
940431 AE2-027 C Adder 14.92 MW 12.68 MW
940432 AE2-027 E Adder 9.94 MW 8.45 MW
940481 AE2-033 C Adder 15.38 MW 13.07 MW
940482 AE2-033 E Adder 10.37 MW 8.81 MW
940541 AE2-040 C Adder 2.73 MW 2.32 MW
940551 AE2-041 C Adder 8.58 MW 7.29 MW
940641 AE2-051 C Adder 15.49 MW 13.17 MW
940642 AE2-051 E Adder 10.33 MW 8.78 MW
941101 AE2-104 C Adder 3.58 MW 3.04 MW
941102 AE2-104 E Adder 5.69 MW 4.83 MW
943471 AF1-018 C Adder 8.58 MW 7.29 MW
944641 AF1-129 C Adder 119.87 MW 101.89 MW
315043 1FOUR RIVERA 50/50 4.42 MW 4.42 MW
315044 1FOUR RIVERB 50/50 4.42 MW 4.42 MW
315045 1FOUR RIVERC 50/50 5.4 MW 5.4 MW
315046 1FOUR RIVERD 50/50 4.36 MW 4.36 MW
315047 1FOUR RIVERE 50/50 4.36 MW 4.36 MW
315048 1FOUR RIVERF 50/50 5.32 MW 5.32 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 24.61 MW 24.61 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 17.81 MW 17.81 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 75.41 MW 75.41 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.3 MW 5.3 MW
NY PJM->LTFIMP_NY CLTF 2.43 MW 2.43 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.01 MW 1.01 MW
WEC LTFEXP_WEC->PJM CLTF 0.52 MW 0.52 MW
CPLE LTFEXP_CPLE->PJM CLTF 9.08 MW 9.08 MW
TVA LTFEXP_TVA->PJM CLTF 4.83 MW 4.83 MW
MEC LTFEXP_MEC->PJM CLTF 3.13 MW 3.13 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.1 MW 6.1 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.2 MW 0.2 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 33.72 MW 33.72 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 4.33 MW 4.33 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 160.57 % 678.68 B 1089.78 236.24
DVP 6FOUR RIVERS-6STJOHN 230.0 kV Ckt 1 line
314212 to 314150 ckt 1
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
OP AC 128.44 % 1123.3 B 1442.76 67.04
DVP 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 1 transformer
314909 to 314466 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 117.03 % 1115.59 B 1305.6 412.54
DVP 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 2 transformer
314909 to 314466 ckt 2
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 116.88 % 1103.28 B 1289.51 407.46
DVP 6FENT1-8FENTRES 230.0/500.0 kV Ckt 3 transformer
314960 to 314909 ckt 3
DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A
CONTINGENCY 'DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314960 CKT 2   /*8FENTRES     500.0 - 6FENT1       230.0
END
OP AC 112.51 % 1130.82 B 1272.24 410.0
DVP 6FENT1-8FENTRES 230.0/500.0 kV Ckt 2 transformer
314960 to 314909 ckt 2
DVP P1-3: 8FENTRESS 500 - 6FENT1 230 XFMR 3_SRT-A
CONTINGENCY 'DVP P1-3: 8FENTRESS 500 - 6FENT1 230 XFMR 3_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314960 CKT 3   /*8FENTRES     500.0 - 6FENT1       230.0
END
OP AC 112.51 % 1130.82 B 1272.24 410.0
DVP 6FENT1-8FENTRES 230.0/500.0 kV Ckt 1 transformer
314960 to 314909 ckt 1
DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A
CONTINGENCY 'DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314960 CKT 2   /*8FENTRES     500.0 - 6FENT1       230.0
END
OP AC 112.51 % 1130.82 B 1272.24 410.0
DVP 6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer
314322 to 314914 ckt 1
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
OP AC 112.18 % 1058.16 B 1187.03 63.25
DVP 8MORRSVL-8LOUDOUN 500.0 kV Ckt 1 line
314916 to 314913 ckt 1
DVP_P1-2: LN 568_SRT-S
CONTINGENCY 'DVP_P1-2: LN 568_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1                /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
END
OP AC 111.43 % 3220.44 B 3588.51 92.28
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
Base Case OP AC 104.96 % 3220.44 A 3380.15 118.53
DVP 8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line
314911 to 314905 ckt 1
DVP_P1-2: LN 573_SRT-A
CONTINGENCY 'DVP_P1-2: LN 573_SRT-A'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
OP AC 103.76 % 4070.2 B 4223.17 161.57
DVP 8CHANCE-8BRISTER 500.0 kV Ckt 1 line
314905 to 314900 ckt 1
DVP_P1-2: LN 594_SRT-S
CONTINGENCY 'DVP_P1-2: LN 594_SRT-S'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
OP AC 103.7 % 4070.2 B 4220.84 158.5
DVP 6THRASHER-6YADKIN 230.0 kV Ckt 1 line
314508 to 314514 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 101.07 % 818.74 B 827.53 291.43
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Base Case OP AC 100.01 % 3193.18 A 3193.61 161.15

Details for 6POCATY-6LANDSTN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6POCATY-6LANDSTN 230.0 kV Ckt 1 line
316171 to 314481 ckt 1
Contingency Name:
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 160.57 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 1089.78 MVA
MW Contribution: 236.24 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
934521 AD1-076 C Adder 4.61 MW 3.92 MW
934522 AD1-076 E Adder 2.35 MW 2.0 MW
940492 AE2-034 E Adder 1.45 MW 1.24 MW
916042 Z1-036 E 50/50 17.0 MW 17.0 MW
313526 AB2-022 C 50/50 0.4 MW 0.4 MW
314507 3THOMPSN Adder -0.89 MW -0.75 MW
314550 6HICKORY 50/50 3.39 MW 3.39 MW
315605 6W1-029WIND 50/50 0.48 MW 0.48 MW
315611 6Z1-036WIND 50/50 0.39 MW 0.39 MW
913392 Y1-086 E 50/50 2.33 MW 2.33 MW
923832 AB2-022 E 50/50 1.32 MW 1.32 MW
901082 W1-029 E 50/50 19.79 MW 19.79 MW
917122 Z2-027 E 50/50 1.26 MW 1.26 MW
957871 AF2-081 C 50/50 13.98 MW 13.98 MW
957872 AF2-081 E 50/50 5.99 MW 5.99 MW
933981 AD1-022 C Adder 2.85 MW 2.42 MW
933982 AD1-022 E Adder 1.55 MW 1.32 MW
314594 6PLYMOUTH TP Adder 0.13 MW 0.11 MW
314632 6AYDLETT TAP 50/50 1.78 MW 1.78 MW
316185 AD1-033 C 50/50 2.51 MW 2.51 MW
316320 Y1-086 C 50/50 0.23 MW 0.23 MW
316321 Z2-027 C 50/50 0.34 MW 0.34 MW
934065 AD1-033 E 50/50 10.26 MW 10.26 MW
937226 AE2-253 E 50/50 8.52 MW 8.52 MW
316017 AA1-139 ULT1 50/50 1.51 MW 1.51 MW
316018 AA1-139 ULT2 50/50 1.51 MW 1.51 MW
919153 AA1-139 E2 50/50 5.72 MW 5.72 MW
919152 AA1-139 E1 50/50 5.72 MW 5.72 MW
920692 AA2-178 E Adder 1.94 MW 1.65 MW
316388 AE2-253 GEN 50/50 2.86 MW 2.86 MW
944581 AF1-123 C 50/50 72.95 MW 72.95 MW
944582 AF1-123 E 50/50 167.04 MW 167.04 MW
944591 AF1-124 C 50/50 73.21 MW 73.21 MW
944592 AF1-124 E 50/50 167.65 MW 167.65 MW
944601 AF1-125 C 50/50 71.82 MW 71.82 MW
944602 AF1-125 E 50/50 164.42 MW 164.42 MW
934501 AD1-074 C Adder 12.7 MW 10.8 MW
934502 AD1-074 E Adder 6.47 MW 5.5 MW
934511 AD1-075 C Adder 3.18 MW 2.7 MW
934512 AD1-075 E Adder 1.62 MW 1.37 MW
938531 AE1-072 C 50/50 23.46 MW 23.46 MW
938532 AE1-072 E 50/50 12.23 MW 12.23 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 1.09 MW 1.09 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 0.76 MW 0.76 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 3.5 MW 3.5 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.1 MW 0.1 MW
NY PJM->LTFIMP_NY CLTF 0.04 MW 0.04 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.04 MW 0.04 MW
WEC LTFEXP_WEC->PJM CLTF 0.02 MW 0.02 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.48 MW 0.48 MW
TVA LTFEXP_TVA->PJM CLTF 0.2 MW 0.2 MW
MEC LTFEXP_MEC->PJM CLTF 0.14 MW 0.14 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.26 MW 0.26 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.61 MW 0.61 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.23 MW 0.23 MW

Details for 6FOUR RIVERS-6STJOHN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 574_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FOUR RIVERS-6STJOHN 230.0 kV Ckt 1 line
314212 to 314150 ckt 1
Contingency Name:
DVP_P1-2: LN 574_SRT-S
CONTINGENCY 'DVP_P1-2: LN 574_SRT-S'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1                /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314905 TO BUS 314911 CKT 1 /*8CHANCE      500.0 - 8LADYSMITH   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 128.44 %
Rating: 1123.3 MVA
Rating Type: B
MVA to Mitigate: 1442.76 MVA
MW Contribution: 67.04 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
314229 6MT RD221 50/50 0.1 MW 0.1 MW
314236 6NRTHEST 50/50 0.13 MW 0.13 MW
314331 6POE Adder 0.7 MW 0.59 MW
314507 3THOMPSN Adder 0.94 MW 0.8 MW
314525 6KINGFORK Adder 0.48 MW 0.41 MW
314550 6HICKORY Adder 1.0 MW 0.85 MW
315060 1CHESTF5 Adder 39.42 MW 33.51 MW
315065 1CHESTF6 Adder 11.97 MW 10.18 MW
315067 1DARBY 1 50/50 1.81 MW 1.81 MW
315068 1DARBY 2 50/50 1.81 MW 1.81 MW
315069 1DARBY 3 50/50 1.82 MW 1.82 MW
315070 1DARBY 4 50/50 1.82 MW 1.82 MW
315073 1STONECA Adder 4.08 MW 3.47 MW
315083 1SPRUNCA Adder 5.6 MW 4.76 MW
315084 1SPRUNCB Adder 5.6 MW 4.76 MW
315092 1YORKTN3 Adder 67.42 MW 57.31 MW
925865 AC1-065 E Adder 8.62 MW 7.33 MW
926412 AC1-112 E 50/50 0.84 MW 0.84 MW
926662 AC1-147 E Adder 0.61 MW 0.52 MW
926755 AC1-161 E Adder 5.88 MW 5.0 MW
927226 AC1-216 E Adder 4.26 MW 3.62 MW
934392 AD1-063 E Adder 0.56 MW 0.47 MW
934782 AD1-105 E Adder 2.56 MW 2.17 MW
935112 AD1-144 E Adder 0.44 MW 0.38 MW
942341 AE2-247 C Adder 0.72 MW 0.61 MW
942342 AE2-247 E Adder 0.99 MW 0.84 MW
943461 AF1-017 C Adder 0.65 MW 0.55 MW
943462 AF1-017 E Adder 1.06 MW 0.9 MW
943612 AF1-032 E Adder 0.42 MW 0.36 MW
966871 AG1-558 C 50/50 1.88 MW 1.88 MW
966872 AG1-558 E 50/50 0.95 MW 0.95 MW
315260 1GOSPORTA Adder 0.99 MW 0.84 MW
315261 1GOSPORTB Adder 1.26 MW 1.07 MW
315262 1GOSPORTC Adder 1.07 MW 0.91 MW
316076 AC2-137 E Adder 0.86 MW 0.73 MW
316157 AD2-030 E Adder 0.6 MW 0.51 MW
916192 Z1-068 E Adder 0.87 MW 0.74 MW
923842 AB2-024 E Adder 0.95 MW 0.81 MW
930122 AB1-027 E 50/50 1.04 MW 1.04 MW
938552 AE1-074 E Adder 0.66 MW 0.56 MW
939312 AE1-162 E Adder 0.71 MW 0.6 MW
946262 AF1-291 E Adder 0.86 MW 0.73 MW
957492 AF2-043 E Adder 0.65 MW 0.55 MW
957601 AF2-054 C Adder 1.06 MW 0.9 MW
957602 AF2-054 E Adder 0.71 MW 0.6 MW
962962 AG1-145 E Adder 0.78 MW 0.67 MW
925332 AB2-190 E Adder 4.58 MW 3.89 MW
925522 AC1-027 E Adder 0.56 MW 0.48 MW
942001 AE2-212 C Adder 1.22 MW 1.04 MW
942002 AE2-212 E Adder 0.82 MW 0.69 MW
957832 AF2-077 E Adder 0.72 MW 0.61 MW
957871 AF2-081 C Adder 4.56 MW 3.87 MW
957872 AF2-081 E Adder 1.95 MW 1.66 MW
958161 AF2-110 C Adder 0.63 MW 0.54 MW
958162 AF2-110 E Adder 1.01 MW 0.86 MW
313811 6ELKO L286 Adder 0.9 MW 0.77 MW
933291 AC2-141 C Adder 13.78 MW 11.71 MW
933292 AC2-141 E Adder 5.88 MW 5.0 MW
934012 AD1-025 E Adder 5.51 MW 4.68 MW
927041 AC1-191 C 50/50 7.55 MW 7.55 MW
927042 AC1-191 E 50/50 3.76 MW 3.76 MW
313053 6PAPERMILL Adder 3.5 MW 2.97 MW
316004 AC1-112 C 50/50 0.25 MW 0.25 MW
316160 AE1-175 E Adder 0.65 MW 0.55 MW
316169 AC1-164 GEN Adder 24.58 MW 20.9 MW
316233 AE1-074 C Adder 1.31 MW 1.12 MW
316240 AF1-291 C Adder 1.29 MW 1.1 MW
316312 AB1-027 C 50/50 0.39 MW 0.39 MW
926785 AC1-164_E Adder 11.05 MW 9.39 MW
934065 AD1-033 E Adder 2.3 MW 1.95 MW
937226 AE2-253 E Adder 2.67 MW 2.27 MW
939612 AE1-191 E Adder 2.91 MW 2.47 MW
315051 AA1-145 CT1 50/50 8.68 MW 8.68 MW
315052 AA1-145 CT2 50/50 8.68 MW 8.68 MW
919153 AA1-139 E2 Adder 1.86 MW 1.58 MW
919152 AA1-139 E1 Adder 1.86 MW 1.58 MW
924814 AB2-134 E Adder 6.97 MW 5.93 MW
316084 AB2-161 E Adder 2.8 MW 2.38 MW
932046 AC2-012 E Adder 6.08 MW 5.17 MW
316311 AC2-079 C Adder 2.74 MW 2.33 MW
932596 AC2-079 E Adder 4.47 MW 3.8 MW
934146 AD1-041 E Adder 1.82 MW 1.54 MW
934576 AD1-082 E Adder 2.23 MW 1.9 MW
316349 AD2-085 C Adder 1.65 MW 1.41 MW
936666 AD2-085 E Adder 2.7 MW 2.29 MW
961611 AG1-000B C Adder 8.39 MW 7.13 MW
941591 AE2-156 C Adder 8.3 MW 7.06 MW
944581 AF1-123 C Adder 20.7 MW 17.6 MW
944582 AF1-123 E Adder 47.4 MW 40.29 MW
944591 AF1-124 C Adder 20.77 MW 17.66 MW
944592 AF1-124 E Adder 47.57 MW 40.44 MW
944601 AF1-125 C Adder 20.38 MW 17.32 MW
944602 AF1-125 E Adder 46.66 MW 39.66 MW
944631 AF1-128 C Adder 24.67 MW 20.97 MW
965281 AG1-393 C Adder 1.24 MW 1.05 MW
965282 AG1-393 E Adder 0.83 MW 0.7 MW
935161 AD1-151 C Adder 9.03 MW 7.68 MW
935162 AD1-151 E Adder 6.02 MW 5.12 MW
938531 AE1-072 C Adder 8.0 MW 6.8 MW
938532 AE1-072 E Adder 4.17 MW 3.55 MW
939191 AE1-149 C Adder 5.64 MW 4.79 MW
939192 AE1-149 E Adder 3.76 MW 3.2 MW
939602 AE1-190 E Adder 0.73 MW 0.62 MW
940431 AE2-027 C Adder 7.54 MW 6.41 MW
940432 AE2-027 E Adder 5.03 MW 4.28 MW
940551 AE2-041 C Adder 3.71 MW 3.15 MW
941101 AE2-104 C Adder 1.55 MW 1.32 MW
941102 AE2-104 E Adder 2.47 MW 2.1 MW
943471 AF1-018 C Adder 3.71 MW 3.15 MW
944641 AF1-129 C Adder 62.45 MW 53.08 MW
315043 1FOUR RIVERA 50/50 5.45 MW 5.45 MW
315044 1FOUR RIVERB 50/50 5.45 MW 5.45 MW
315045 1FOUR RIVERC 50/50 6.66 MW 6.66 MW
315046 1FOUR RIVERD 50/50 5.37 MW 5.37 MW
315047 1FOUR RIVERE 50/50 5.37 MW 5.37 MW
315048 1FOUR RIVERF 50/50 6.56 MW 6.56 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 19.18 MW 19.18 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.33 MW 11.33 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 37.13 MW 37.13 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.52 MW 2.52 MW
NY PJM->LTFIMP_NY CLTF 1.14 MW 1.14 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.77 MW 0.77 MW
WEC LTFEXP_WEC->PJM CLTF 0.4 MW 0.4 MW
CPLE LTFEXP_CPLE->PJM CLTF 4.19 MW 4.19 MW
TVA LTFEXP_TVA->PJM CLTF 2.91 MW 2.91 MW
MEC LTFEXP_MEC->PJM CLTF 2.2 MW 2.2 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.62 MW 3.62 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.14 MW 0.14 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 15.98 MW 15.98 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.0 MW 2.0 MW

Details for 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8FENTRES-6FENTRES 500.0/230.0 kV Ckt 1 transformer
314909 to 314466 ckt 1
Contingency Name:
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 117.03 %
Rating: 1115.59 MVA
Rating Type: B
MVA to Mitigate: 1305.6 MVA
MW Contribution: 412.54 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944581 AF1-123 C 50/50 127.39 MW 127.39 MW
944582 AF1-123 E 50/50 291.7 MW 291.7 MW
944591 AF1-124 C 50/50 127.84 MW 127.84 MW
944592 AF1-124 E 50/50 292.75 MW 292.75 MW
944601 AF1-125 C 50/50 125.42 MW 125.42 MW
944602 AF1-125 E 50/50 287.12 MW 287.12 MW

Details for 8FENTRES-6FENTRES 500.0/230.0 kV Ckt 2 transformer l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8FENTRES-6FENTRES 500.0/230.0 kV Ckt 2 transformer
314909 to 314466 ckt 2
Contingency Name:
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 116.88 %
Rating: 1103.28 MVA
Rating Type: B
MVA to Mitigate: 1289.51 MVA
MW Contribution: 407.46 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944581 AF1-123 C 50/50 125.81 MW 125.81 MW
944582 AF1-123 E 50/50 288.1 MW 288.1 MW
944591 AF1-124 C 50/50 126.26 MW 126.26 MW
944592 AF1-124 E 50/50 289.15 MW 289.15 MW
944601 AF1-125 C 50/50 123.88 MW 123.88 MW
944602 AF1-125 E 50/50 283.58 MW 283.58 MW

Details for 6FENT1-8FENTRES 230.0/500.0 kV Ckt 3 transformer l/o DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FENT1-8FENTRES 230.0/500.0 kV Ckt 3 transformer
314960 to 314909 ckt 3
Contingency Name:
DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A
CONTINGENCY 'DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314960 CKT 2   /*8FENTRES     500.0 - 6FENT1       230.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 112.51 %
Rating: 1130.82 MVA
Rating Type: B
MVA to Mitigate: 1272.24 MVA
MW Contribution: 410.0 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944581 AF1-123 C 50/50 126.6 MW 126.6 MW
944582 AF1-123 E 50/50 289.9 MW 289.9 MW
944591 AF1-124 C 50/50 127.05 MW 127.05 MW
944592 AF1-124 E 50/50 290.95 MW 290.95 MW
944601 AF1-125 C 50/50 124.65 MW 124.65 MW
944602 AF1-125 E 50/50 285.35 MW 285.35 MW

Details for 6FENT1-8FENTRES 230.0/500.0 kV Ckt 2 transformer l/o DVP P1-3: 8FENTRESS 500 - 6FENT1 230 XFMR 3_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FENT1-8FENTRES 230.0/500.0 kV Ckt 2 transformer
314960 to 314909 ckt 2
Contingency Name:
DVP P1-3: 8FENTRESS 500 - 6FENT1 230 XFMR 3_SRT-A
CONTINGENCY 'DVP P1-3: 8FENTRESS 500 - 6FENT1 230 XFMR 3_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314960 CKT 3   /*8FENTRES     500.0 - 6FENT1       230.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 112.51 %
Rating: 1130.82 MVA
Rating Type: B
MVA to Mitigate: 1272.24 MVA
MW Contribution: 410.0 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944581 AF1-123 C 50/50 126.6 MW 126.6 MW
944582 AF1-123 E 50/50 289.9 MW 289.9 MW
944591 AF1-124 C 50/50 127.05 MW 127.05 MW
944592 AF1-124 E 50/50 290.95 MW 290.95 MW
944601 AF1-125 C 50/50 124.65 MW 124.65 MW
944602 AF1-125 E 50/50 285.35 MW 285.35 MW

Details for 6FENT1-8FENTRES 230.0/500.0 kV Ckt 1 transformer l/o DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FENT1-8FENTRES 230.0/500.0 kV Ckt 1 transformer
314960 to 314909 ckt 1
Contingency Name:
DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A
CONTINGENCY 'DVP P1-3: 8FENTRESS 500 - 6FENT2 230 XFMR 2_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314960 CKT 2   /*8FENTRES     500.0 - 6FENT1       230.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 112.51 %
Rating: 1130.82 MVA
Rating Type: B
MVA to Mitigate: 1272.24 MVA
MW Contribution: 410.0 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944581 AF1-123 C 50/50 126.6 MW 126.6 MW
944582 AF1-123 E 50/50 289.9 MW 289.9 MW
944591 AF1-124 C 50/50 127.05 MW 127.05 MW
944592 AF1-124 E 50/50 290.95 MW 290.95 MW
944601 AF1-125 C 50/50 124.65 MW 124.65 MW
944602 AF1-125 E 50/50 285.35 MW 285.35 MW

Details for 6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 563_SRT-S-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer
314322 to 314914 ckt 1
Contingency Name:
DVP_P1-2: LN 563_SRT-S-1
CONTINGENCY 'DVP_P1-2: LN 563_SRT-S-1'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1                /*8CARSON      500.0 - 8MDLTHAN     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
 SET POSTCONTRATING 3118 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 940640 CKT 1 /*8CARSON      500.0 - AE2-051 TP   500.0
 SET PRECONTRATING 2858 BRANCH FROM BUS 314923 TO BUS 940640 CKT 1 /*8SEPTA       500.0 - AE2-051 TP   500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 112.18 %
Rating: 1058.16 MVA
Rating Type: B
MVA to Mitigate: 1187.03 MVA
MW Contribution: 63.25 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961791 AG1-021 C Adder 0.98 MW 0.83 MW
961792 AG1-021 E Adder 0.83 MW 0.71 MW
963041 AG1-153 C Adder 2.27 MW 1.93 MW
963042 AG1-153 E Adder 3.4 MW 2.89 MW
963171 AG1-166 C Adder 0.54 MW 0.46 MW
963172 AG1-166 E Adder 1.27 MW 1.08 MW
963181 AG1-167 C Adder 0.41 MW 0.35 MW
963182 AG1-167 E Adder 0.95 MW 0.81 MW
963191 AG1-168 C Adder 0.41 MW 0.35 MW
963192 AG1-168 E Adder 0.95 MW 0.81 MW
965291 AG1-394 C Adder 0.38 MW 0.32 MW
965292 AG1-394 E Adder 0.7 MW 0.59 MW
966621 AG1-532 C Adder 0.64 MW 0.54 MW
966622 AG1-532 E Adder 0.43 MW 0.36 MW
313853 3PONTONDP Adder 0.36 MW 0.31 MW
314541 3WATKINS Adder 0.31 MW 0.26 MW
314572 3EMPORIA Adder 0.2 MW 0.17 MW
314713 3PAMPLIN Adder 0.55 MW 0.47 MW
920042 AA2-088 E OP Adder 4.73 MW 4.02 MW
944011 AF1-069 C Adder 5.23 MW 4.45 MW
944012 AF1-069 E Adder 2.03 MW 1.73 MW
959311 AF2-222 C Adder 8.56 MW 7.28 MW
959312 AF2-222 E Adder 5.74 MW 4.88 MW
960081 AF2-299 C Adder 0.85 MW 0.72 MW
960082 AF2-299 E Adder 0.57 MW 0.48 MW
923573 AB1-173 E OP Adder 1.48 MW 1.26 MW
924162 AB2-060 E OP Adder 2.02 MW 1.72 MW
924302 AB2-077 E O1 Adder 0.62 MW 0.53 MW
924312 AB2-078 E O1 Adder 0.62 MW 0.53 MW
924322 AB2-079 E O1 Adder 0.62 MW 0.53 MW
925612 AC1-036 E Adder 0.44 MW 0.37 MW
938371 AE1-056 C Adder 3.58 MW 3.05 MW
938372 AE1-056 E Adder 1.96 MW 1.66 MW
941011 AE2-092 C Adder 6.7 MW 5.69 MW
941012 AE2-092 E Adder 4.46 MW 3.79 MW
941031 AE2-094 C Adder 16.01 MW 13.61 MW
941032 AE2-094 E Adder 7.17 MW 6.09 MW
946281 AF1-292 C Adder 0.71 MW 0.6 MW
946282 AF1-292 E Adder 0.47 MW 0.4 MW
946301 AF1-294 C Adder 2.01 MW 1.71 MW
946302 AF1-294 E Adder 1.7 MW 1.44 MW
957481 AF2-042 C Adder 23.26 MW 19.77 MW
957482 AF2-042 E Adder 15.51 MW 13.18 MW
958211 AF2-115 C Adder 1.22 MW 1.04 MW
958212 AF2-115 E Adder 1.04 MW 0.88 MW
314539 3UNCAMP Adder 2.72 MW 2.32 MW
916042 Z1-036 E Adder 12.45 MW 10.59 MW
938771 AE1-103 C Adder 1.31 MW 1.12 MW
938772 AE1-103 E Adder 1.81 MW 1.54 MW
924032 AB2-045 E Adder 0.96 MW 0.81 MW
933502 AC2-165 E 50/50 10.22 MW 10.22 MW
314309 6IRON208 50/50 0.33 MW 0.33 MW
314331 6POE Adder 0.76 MW 0.64 MW
314507 3THOMPSN Adder 0.89 MW 0.76 MW
314525 6KINGFORK Adder 0.46 MW 0.39 MW
314550 6HICKORY Adder 0.95 MW 0.8 MW
315060 1CHESTF5 Adder 39.49 MW 33.56 MW
315065 1CHESTF6 Adder 12.61 MW 10.72 MW
315073 1STONECA Adder 4.15 MW 3.53 MW
315083 1SPRUNCA 50/50 9.45 MW 9.45 MW
315084 1SPRUNCB 50/50 9.45 MW 9.45 MW
315092 1YORKTN3 Adder 58.61 MW 49.82 MW
925865 AC1-065 E Adder 7.74 MW 6.58 MW
926412 AC1-112 E Adder 0.57 MW 0.48 MW
926662 AC1-147 E Adder 0.58 MW 0.49 MW
927226 AC1-216 E Adder 4.21 MW 3.58 MW
934392 AD1-063 E Adder 0.49 MW 0.41 MW
935112 AD1-144 E Adder 0.42 MW 0.36 MW
942341 AE2-247 C Adder 0.71 MW 0.61 MW
942342 AE2-247 E Adder 0.99 MW 0.84 MW
943461 AF1-017 C Adder 0.65 MW 0.55 MW
943462 AF1-017 E Adder 1.05 MW 0.9 MW
943612 AF1-032 E Adder 0.41 MW 0.34 MW
958502 AF2-144 E 50/50 1.78 MW 1.78 MW
966871 AG1-558 C Adder 1.28 MW 1.09 MW
966872 AG1-558 E Adder 0.64 MW 0.55 MW
315260 1GOSPORTA Adder 0.94 MW 0.8 MW
315261 1GOSPORTB Adder 1.2 MW 1.02 MW
315262 1GOSPORTC Adder 1.02 MW 0.86 MW
316076 AC2-137 E Adder 0.74 MW 0.62 MW
316157 AD2-030 E Adder 0.54 MW 0.46 MW
913392 Y1-086 E Adder 0.96 MW 0.81 MW
916192 Z1-068 E Adder 0.82 MW 0.7 MW
923832 AB2-022 E Adder 0.54 MW 0.46 MW
923842 AB2-024 E Adder 0.82 MW 0.7 MW
923852 AB2-025 E Adder 0.55 MW 0.47 MW
923862 AB2-026 E 50/50 1.81 MW 1.81 MW
930122 AB1-027 E Adder 0.7 MW 0.59 MW
938552 AE1-074 E 50/50 1.88 MW 1.88 MW
938562 AE1-075 E 50/50 1.54 MW 1.54 MW
939312 AE1-162 E Adder 0.68 MW 0.58 MW
946262 AF1-291 E Adder 0.91 MW 0.78 MW
957492 AF2-043 E Adder 0.62 MW 0.53 MW
957601 AF2-054 C Adder 0.95 MW 0.81 MW
957602 AF2-054 E Adder 0.64 MW 0.54 MW
962962 AG1-145 E Adder 0.66 MW 0.56 MW
901082 W1-029 E Adder 13.92 MW 11.83 MW
917122 Z2-027 E Adder 0.58 MW 0.5 MW
925332 AB2-190 E Adder 4.58 MW 3.89 MW
925522 AC1-027 E Adder 0.53 MW 0.45 MW
942001 AE2-212 C Adder 1.31 MW 1.11 MW
942002 AE2-212 E Adder 0.87 MW 0.74 MW
957832 AF2-077 E Adder 0.64 MW 0.54 MW
957871 AF2-081 C Adder 4.34 MW 3.69 MW
957872 AF2-081 E Adder 1.86 MW 1.58 MW
958161 AF2-110 C Adder 0.62 MW 0.52 MW
958162 AF2-110 E Adder 0.98 MW 0.83 MW
313811 6ELKO L286 Adder 0.77 MW 0.65 MW
314722 3TWITTYS Adder 0.48 MW 0.41 MW
926071 AC1-086 C Adder 7.79 MW 6.62 MW
936261 AD2-033 C Adder 6.52 MW 5.54 MW
936262 AD2-033 E Adder 4.35 MW 3.69 MW
934621 AD1-088 C Adder 5.74 MW 4.88 MW
934622 AD1-088 E Adder 2.7 MW 2.3 MW
939411 AE1-173 C Adder 37.39 MW 31.78 MW
939412 AE1-173 E Adder 24.93 MW 21.19 MW
934012 AD1-025 E Adder 5.45 MW 4.63 MW
927041 AC1-191 C Adder 5.13 MW 4.36 MW
927042 AC1-191 E Adder 2.56 MW 2.17 MW
313053 6PAPERMILL Adder 3.04 MW 2.58 MW
314632 6AYDLETT TAP Adder 0.59 MW 0.5 MW
316160 AE1-175 E Adder 0.54 MW 0.46 MW
316169 AC1-164 GEN Adder 19.82 MW 16.85 MW
316233 AE1-074 C 50/50 3.73 MW 3.73 MW
316240 AF1-291 C Adder 1.37 MW 1.16 MW
316258 AE1-075 C 50/50 0.51 MW 0.51 MW
316313 AB2-026 C 50/50 0.56 MW 0.56 MW
316336 AC2-165 C 50/50 13.58 MW 13.58 MW
316405 AF2-144 C 50/50 0.43 MW 0.43 MW
924516 AB2-100 E1 Adder 1.32 MW 1.12 MW
924517 AB2-100 E2 Adder 1.32 MW 1.12 MW
926785 AC1-164_E Adder 8.9 MW 7.57 MW
934065 AD1-033 E Adder 2.18 MW 1.85 MW
937226 AE2-253 E Adder 2.54 MW 2.15 MW
939612 AE1-191 E Adder 2.61 MW 2.22 MW
919153 AA1-139 E2 Adder 1.77 MW 1.51 MW
919152 AA1-139 E1 Adder 1.77 MW 1.51 MW
923994 AB2-040_E Adder 2.77 MW 2.36 MW
924022 AB2-043 E O1 Adder 2.43 MW 2.06 MW
924814 AB2-134 E Adder 6.89 MW 5.86 MW
316084 AB2-161 E Adder 2.88 MW 2.45 MW
316088 AB2-174 E Adder 2.95 MW 2.51 MW
932046 AC2-012 E Adder 5.76 MW 4.9 MW
316311 AC2-079 C Adder 2.72 MW 2.31 MW
932596 AC2-079 E Adder 4.44 MW 3.78 MW
934146 AD1-041 E Adder 1.63 MW 1.39 MW
934576 AD1-082 E Adder 2.29 MW 1.95 MW
316349 AD2-085 C Adder 1.65 MW 1.4 MW
936666 AD2-085 E Adder 2.69 MW 2.28 MW
961611 AG1-000B C Adder 8.12 MW 6.91 MW
941591 AE2-156 C Adder 7.86 MW 6.68 MW
944581 AF1-123 C Adder 19.53 MW 16.6 MW
944582 AF1-123 E Adder 44.72 MW 38.01 MW
944591 AF1-124 C Adder 19.6 MW 16.66 MW
944592 AF1-124 E Adder 44.88 MW 38.15 MW
944601 AF1-125 C Adder 19.23 MW 16.34 MW
944602 AF1-125 E Adder 44.02 MW 37.41 MW
944631 AF1-128 C Adder 24.71 MW 21.0 MW
962491 AG1-098 C Adder 5.2 MW 4.42 MW
962492 AG1-098 E Adder 3.47 MW 2.95 MW
964241 AG1-285 C Adder 6.05 MW 5.14 MW
964242 AG1-285 E Adder 4.03 MW 3.43 MW
965281 AG1-393 C Adder 1.31 MW 1.12 MW
965282 AG1-393 E Adder 0.88 MW 0.74 MW
313764 3SOCKMAN Adder 0.32 MW 0.27 MW
934612 AD1-087 E Adder 1.56 MW 1.33 MW
935161 AD1-151 C Adder 8.99 MW 7.64 MW
935162 AD1-151 E Adder 5.99 MW 5.09 MW
937482 AD2-202 E Adder 0.46 MW 0.39 MW
938531 AE1-072 C Adder 7.63 MW 6.49 MW
938532 AE1-072 E Adder 3.98 MW 3.38 MW
938821 AE1-108 C Adder 8.07 MW 6.86 MW
938822 AE1-108 E Adder 3.85 MW 3.27 MW
939191 AE1-149 C Adder 5.9 MW 5.02 MW
939192 AE1-149 E Adder 3.94 MW 3.35 MW
939602 AE1-190 E Adder 0.65 MW 0.56 MW
940431 AE2-027 C Adder 7.98 MW 6.78 MW
940432 AE2-027 E Adder 5.32 MW 4.52 MW
940481 AE2-033 C Adder 7.63 MW 6.49 MW
940482 AE2-033 E Adder 5.14 MW 4.37 MW
940541 AE2-040 C Adder 1.36 MW 1.16 MW
940551 AE2-041 C Adder 3.26 MW 2.77 MW
940641 AE2-051 C Adder 7.03 MW 5.97 MW
940642 AE2-051 E Adder 4.68 MW 3.98 MW
941101 AE2-104 C Adder 1.51 MW 1.28 MW
941102 AE2-104 E Adder 2.4 MW 2.04 MW
942461 AE2-259 C Adder 5.86 MW 4.98 MW
942462 AE2-259 E Adder 3.91 MW 3.32 MW
943471 AF1-018 C Adder 3.26 MW 2.77 MW
944641 AF1-129 C Adder 65.79 MW 55.92 MW
315085 1SPRUNCC 50/50 0.17 MW 0.17 MW
315086 1SPRUNCD 50/50 0.17 MW 0.17 MW
316303 AF2-085 50/50 7.03 MW 7.03 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 18.02 MW 18.02 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.28 MW 11.28 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 40.63 MW 40.63 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.11 MW 2.11 MW
NY PJM->LTFIMP_NY CLTF 0.96 MW 0.96 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.72 MW 0.72 MW
WEC LTFEXP_WEC->PJM CLTF 0.37 MW 0.37 MW
CPLE LTFEXP_CPLE->PJM CLTF 4.7 MW 4.7 MW
TVA LTFEXP_TVA->PJM CLTF 2.95 MW 2.95 MW
MEC LTFEXP_MEC->PJM CLTF 2.13 MW 2.13 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.69 MW 3.69 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.14 MW 0.14 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 13.41 MW 13.41 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 2.24 MW 2.24 MW

Details for 8MORRSVL-8LOUDOUN 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 568_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8MORRSVL-8LOUDOUN 500.0 kV Ckt 1 line
314916 to 314913 ckt 1
Contingency Name:
DVP_P1-2: LN 568_SRT-S
CONTINGENCY 'DVP_P1-2: LN 568_SRT-S'
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1                /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 111.43 %
Rating: 3220.44 MVA
Rating Type: B
MVA to Mitigate: 3588.51 MVA
MW Contribution: 92.28 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944011 AF1-069 C Adder 7.52 MW 6.39 MW
944012 AF1-069 E Adder 2.92 MW 2.48 MW
941031 AE2-094 C Adder 23.0 MW 19.55 MW
941032 AE2-094 E Adder 10.3 MW 8.76 MW
314331 6POE Adder 0.85 MW 0.72 MW
314507 3THOMPSN Adder 1.27 MW 1.08 MW
314525 6KINGFORK Adder 0.64 MW 0.54 MW
314550 6HICKORY Adder 1.36 MW 1.16 MW
315021 1REMNGT1 50/50 4.05 MW 4.05 MW
315022 1REMNGT2 50/50 4.09 MW 4.09 MW
315023 1REMNGT3 50/50 4.6 MW 4.6 MW
315024 1REMNGT4 50/50 4.11 MW 4.11 MW
315028 1M RUN A 50/50 4.58 MW 4.58 MW
315029 1M RUN B 50/50 4.54 MW 4.54 MW
315030 1M RUN C 50/50 4.58 MW 4.58 MW
315060 1CHESTF5 Adder 39.76 MW 33.79 MW
315065 1CHESTF6 Adder 12.44 MW 10.57 MW
315073 1STONECA Adder 4.36 MW 3.7 MW
315083 1SPRUNCA Adder 5.81 MW 4.94 MW
315084 1SPRUNCB Adder 5.81 MW 4.94 MW
315092 1YORKTN3 Adder 82.75 MW 70.34 MW
926412 AC1-112 E Adder 0.7 MW 0.59 MW
926662 AC1-147 E Adder 0.83 MW 0.71 MW
926755 AC1-161 E Adder 8.15 MW 6.93 MW
927226 AC1-216 E Adder 4.87 MW 4.14 MW
934861 AD1-115 C 50/50 3.16 MW 3.16 MW
934862 AD1-115 E 50/50 5.16 MW 5.16 MW
935112 AD1-144 E Adder 0.59 MW 0.5 MW
942341 AE2-247 C Adder 0.93 MW 0.79 MW
942342 AE2-247 E Adder 1.29 MW 1.1 MW
943461 AF1-017 C Adder 0.85 MW 0.72 MW
943462 AF1-017 E Adder 1.38 MW 1.17 MW
943612 AF1-032 E Adder 0.58 MW 0.49 MW
958502 AF2-144 E Adder 0.75 MW 0.64 MW
966871 AG1-558 C Adder 1.46 MW 1.24 MW
966872 AG1-558 E Adder 0.74 MW 0.63 MW
315177 1S ANNAG1 50/50 1.75 MW 1.75 MW
315178 1S ANNAS1 50/50 0.9 MW 0.9 MW
315179 1S ANNAG2 50/50 1.75 MW 1.75 MW
315180 1S ANNAS2 50/50 0.9 MW 0.9 MW
315225 1N ANNA1 50/50 25.67 MW 25.67 MW
315226 1N ANNA2 50/50 25.68 MW 25.68 MW
315260 1GOSPORTA Adder 1.34 MW 1.14 MW
315261 1GOSPORTB Adder 1.71 MW 1.45 MW
315262 1GOSPORTC Adder 1.45 MW 1.23 MW
316076 AC2-137 E Adder 0.83 MW 0.7 MW
913392 Y1-086 E Adder 1.37 MW 1.16 MW
916192 Z1-068 E Adder 1.18 MW 1.0 MW
923832 AB2-022 E Adder 0.77 MW 0.66 MW
923852 AB2-025 E Adder 0.69 MW 0.59 MW
923862 AB2-026 E Adder 0.76 MW 0.65 MW
925022 AB2-158 E 50/50 4.23 MW 4.23 MW
930122 AB1-027 E Adder 0.86 MW 0.73 MW
938552 AE1-074 E Adder 0.8 MW 0.68 MW
938562 AE1-075 E Adder 0.65 MW 0.55 MW
939312 AE1-162 E Adder 0.9 MW 0.77 MW
946262 AF1-291 E Adder 0.91 MW 0.77 MW
957492 AF2-043 E Adder 0.89 MW 0.76 MW
962962 AG1-145 E Adder 0.9 MW 0.76 MW
963031 AG1-152 C 50/50 6.65 MW 6.65 MW
963032 AG1-152 E 50/50 9.98 MW 9.98 MW
966001 AG1-469 C 50/50 1.41 MW 1.41 MW
966002 AG1-469 E 50/50 0.7 MW 0.7 MW
901082 W1-029 E Adder 19.81 MW 16.84 MW
917122 Z2-027 E Adder 0.84 MW 0.71 MW
925332 AB2-190 E Adder 5.09 MW 4.33 MW
925522 AC1-027 E Adder 0.76 MW 0.65 MW
925672 AC1-043 E 50/50 10.32 MW 10.32 MW
942001 AE2-212 C Adder 1.36 MW 1.16 MW
942002 AE2-212 E Adder 0.91 MW 0.77 MW
957832 AF2-077 E Adder 0.87 MW 0.74 MW
957871 AF2-081 C Adder 6.24 MW 5.3 MW
957872 AF2-081 E Adder 2.67 MW 2.27 MW
958161 AF2-110 C Adder 0.85 MW 0.73 MW
958162 AF2-110 E Adder 1.36 MW 1.16 MW
313811 6ELKO L286 Adder 0.86 MW 0.73 MW
933291 AC2-141 C Adder 19.1 MW 16.23 MW
933292 AC2-141 E Adder 8.15 MW 6.93 MW
939411 AE1-173 C Adder 54.49 MW 46.32 MW
939412 AE1-173 E Adder 36.33 MW 30.88 MW
923892 AB2-029 E 50/50 2.04 MW 2.04 MW
934012 AD1-025 E Adder 6.3 MW 5.36 MW
927041 AC1-191 C Adder 5.88 MW 4.99 MW
927042 AC1-191 E Adder 2.93 MW 2.49 MW
314632 6AYDLETT TAP Adder 0.85 MW 0.72 MW
316160 AE1-175 E Adder 0.74 MW 0.63 MW
316164 AC1-076_C 50/50 0.66 MW 0.66 MW
316169 AC1-164 GEN Adder 24.85 MW 21.12 MW
316170 AC1-121 C 50/50 2.26 MW 2.26 MW
316192 AB2-158 C 50/50 1.59 MW 1.59 MW
316233 AE1-074 C Adder 1.58 MW 1.34 MW
316240 AF1-291 C Adder 1.37 MW 1.16 MW
316254 AC1-120 C 50/50 6.58 MW 6.58 MW
316257 AC1-043 C 50/50 6.32 MW 6.32 MW
926785 AC1-164_E Adder 11.16 MW 9.49 MW
934065 AD1-033 E Adder 3.14 MW 2.67 MW
937226 AE2-253 E Adder 3.65 MW 3.1 MW
926004 AC1-076_E 50/50 3.8 MW 3.8 MW
926486 AC1-120 E 50/50 3.39 MW 3.39 MW
926502 AC1-121 E 50/50 1.06 MW 1.06 MW
926615 AC1-143 E 50/50 3.14 MW 3.14 MW
316006 AB2-029 C 50/50 0.21 MW 0.21 MW
316267 AC1-143 C 50/50 6.88 MW 6.88 MW
316411 AF1-147_GEN1 Adder -4.05 MW -3.44 MW
316415 AF1-147_GEN2 Adder -4.05 MW -3.44 MW
919153 AA1-139 E2 Adder 2.55 MW 2.17 MW
919152 AA1-139 E1 Adder 2.55 MW 2.17 MW
924814 AB2-134 E Adder 7.97 MW 6.78 MW
316084 AB2-161 E Adder 3.48 MW 2.95 MW
316044 AC1-158 C1 50/50 5.64 MW 5.64 MW
316045 AC1-158 C2 50/50 5.64 MW 5.64 MW
926739 AC1-158 E1 50/50 14.74 MW 14.74 MW
926740 AC1-158 E2 50/50 14.74 MW 14.74 MW
932046 AC2-012 E Adder 8.23 MW 6.99 MW
316311 AC2-079 C Adder 3.59 MW 3.05 MW
932596 AC2-079 E Adder 5.86 MW 4.98 MW
934576 AD1-082 E Adder 2.77 MW 2.35 MW
316349 AD2-085 C Adder 2.16 MW 1.83 MW
936666 AD2-085 E Adder 3.52 MW 2.99 MW
961611 AG1-000B C Adder 10.02 MW 8.52 MW
941591 AE2-156 C Adder 11.24 MW 9.55 MW
944581 AF1-123 C Adder 28.49 MW 24.22 MW
944582 AF1-123 E Adder 65.25 MW 55.46 MW
944591 AF1-124 C Adder 28.59 MW 24.3 MW
944592 AF1-124 E Adder 65.48 MW 55.66 MW
944601 AF1-125 C Adder 28.05 MW 23.85 MW
944602 AF1-125 E Adder 64.22 MW 54.59 MW
944631 AF1-128 C Adder 24.88 MW 21.14 MW
965281 AG1-393 C Adder 1.36 MW 1.16 MW
965282 AG1-393 E Adder 0.91 MW 0.77 MW
935161 AD1-151 C Adder 10.18 MW 8.65 MW
935162 AD1-151 E Adder 6.78 MW 5.77 MW
938531 AE1-072 C Adder 10.97 MW 9.32 MW
938532 AE1-072 E Adder 5.72 MW 4.86 MW
939191 AE1-149 C Adder 6.76 MW 5.75 MW
939192 AE1-149 E Adder 4.51 MW 3.83 MW
939221 AE1-153 C 50/50 14.36 MW 14.36 MW
939222 AE1-153 E 50/50 9.57 MW 9.57 MW
940431 AE2-027 C Adder 8.17 MW 6.94 MW
940432 AE2-027 E Adder 5.44 MW 4.63 MW
940481 AE2-033 C Adder 9.66 MW 8.21 MW
940482 AE2-033 E Adder 6.51 MW 5.54 MW
940541 AE2-040 C Adder 1.72 MW 1.46 MW
940641 AE2-051 C Adder 10.26 MW 8.72 MW
940642 AE2-051 E Adder 6.84 MW 5.81 MW
941101 AE2-104 C Adder 2.09 MW 1.78 MW
941102 AE2-104 E Adder 3.33 MW 2.83 MW
944641 AF1-129 C Adder 64.86 MW 55.13 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 34.56 MW 34.56 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 19.68 MW 19.68 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 61.61 MW 61.61 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.77 MW 5.77 MW
NY PJM->LTFIMP_NY CLTF 2.57 MW 2.57 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.38 MW 1.38 MW
WEC LTFEXP_WEC->PJM CLTF 0.71 MW 0.71 MW
CPLE LTFEXP_CPLE->PJM CLTF 6.86 MW 6.86 MW
TVA LTFEXP_TVA->PJM CLTF 4.99 MW 4.99 MW
MEC LTFEXP_MEC->PJM CLTF 3.9 MW 3.9 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.21 MW 6.21 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.25 MW 0.25 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.63 MW 36.63 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 3.28 MW 3.28 MW

Details for 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 104.96 %
Rating: 3220.44 MVA
Rating Type: A
MVA to Mitigate: 3380.15 MVA
MW Contribution: 118.53 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C 50/50 4.35 MW 4.35 MW
963042 AG1-153 E 50/50 6.53 MW 6.53 MW
314541 3WATKINS Adder 0.54 MW 0.46 MW
944011 AF1-069 C 50/50 10.21 MW 10.21 MW
944012 AF1-069 E 50/50 3.97 MW 3.97 MW
941031 AE2-094 C 50/50 31.25 MW 31.25 MW
941032 AE2-094 E 50/50 14.0 MW 14.0 MW
314539 3UNCAMP Adder 4.78 MW 4.07 MW
916042 Z1-036 E Adder 22.56 MW 19.17 MW
938771 AE1-103 C Adder 2.31 MW 1.96 MW
938772 AE1-103 E Adder 3.19 MW 2.71 MW
314331 6POE 50/50 1.1 MW 1.1 MW
314507 3THOMPSN Adder 1.62 MW 1.38 MW
314525 6KINGFORK Adder 0.81 MW 0.69 MW
314550 6HICKORY Adder 1.75 MW 1.49 MW
315060 1CHESTF5 Adder 48.68 MW 41.38 MW
315065 1CHESTF6 Adder 15.6 MW 13.26 MW
315073 1STONECA Adder 5.43 MW 4.62 MW
315083 1SPRUNCA 50/50 7.37 MW 7.37 MW
315084 1SPRUNCB 50/50 7.37 MW 7.37 MW
315092 1YORKTN3 Adder 103.0 MW 87.55 MW
926662 AC1-147 E Adder 1.07 MW 0.91 MW
926755 AC1-161 E 50/50 10.45 MW 10.45 MW
927226 AC1-216 E Adder 6.11 MW 5.19 MW
935112 AD1-144 E Adder 0.75 MW 0.64 MW
942341 AE2-247 C Adder 1.2 MW 1.02 MW
942342 AE2-247 E Adder 1.65 MW 1.4 MW
943461 AF1-017 C Adder 1.08 MW 0.92 MW
943462 AF1-017 E Adder 1.77 MW 1.5 MW
943612 AF1-032 E Adder 0.74 MW 0.63 MW
958502 AF2-144 E Adder 0.95 MW 0.81 MW
315102 1BRUNSWICKG1 50/50 6.4 MW 6.4 MW
315103 1BRUNSWICKG2 50/50 6.4 MW 6.4 MW
315104 1BRUNSWICKG3 50/50 6.4 MW 6.4 MW
315105 1BRUNSWICKS1 50/50 13.29 MW 13.29 MW
315108 1ELIZAR1 50/50 2.57 MW 2.57 MW
315109 1ELIZAR2 50/50 2.52 MW 2.52 MW
315110 1ELIZAR3 50/50 2.6 MW 2.6 MW
315225 1N ANNA1 50/50 47.56 MW 47.56 MW
315226 1N ANNA2 50/50 47.58 MW 47.58 MW
315241 1Z1-086 GT1 50/50 8.19 MW 8.19 MW
315242 1Z1-086 GT2 50/50 8.19 MW 8.19 MW
315243 1Z1-086 GT3 50/50 8.19 MW 8.19 MW
315244 1Z1-086 ST 50/50 14.26 MW 14.26 MW
315260 1GOSPORTA Adder 1.71 MW 1.46 MW
315261 1GOSPORTB Adder 2.19 MW 1.86 MW
315262 1GOSPORTC Adder 1.86 MW 1.58 MW
316076 AC2-137 E Adder 0.99 MW 0.84 MW
913392 Y1-086 E Adder 1.75 MW 1.49 MW
916192 Z1-068 E Adder 1.51 MW 1.28 MW
923832 AB2-022 E Adder 0.99 MW 0.84 MW
923852 AB2-025 E Adder 0.91 MW 0.77 MW
923862 AB2-026 E Adder 0.97 MW 0.82 MW
925022 AB2-158 E 50/50 4.89 MW 4.89 MW
938552 AE1-074 E 50/50 1.05 MW 1.05 MW
938562 AE1-075 E Adder 0.83 MW 0.7 MW
939312 AE1-162 E Adder 1.14 MW 0.97 MW
946262 AF1-291 E Adder 1.15 MW 0.97 MW
957492 AF2-043 E Adder 1.14 MW 0.97 MW
962962 AG1-145 E Adder 1.1 MW 0.94 MW
901082 W1-029 E Adder 25.36 MW 21.56 MW
917122 Z2-027 E Adder 1.07 MW 0.91 MW
925332 AB2-190 E Adder 6.37 MW 5.42 MW
925522 AC1-027 E Adder 0.98 MW 0.83 MW
942001 AE2-212 C 50/50 1.74 MW 1.74 MW
942002 AE2-212 E 50/50 1.16 MW 1.16 MW
957832 AF2-077 E Adder 1.08 MW 0.92 MW
957871 AF2-081 C Adder 8.0 MW 6.8 MW
957872 AF2-081 E Adder 3.43 MW 2.92 MW
958161 AF2-110 C Adder 1.09 MW 0.93 MW
958162 AF2-110 E Adder 1.74 MW 1.48 MW
313811 6ELKO L286 Adder 1.03 MW 0.88 MW
933291 AC2-141 C 50/50 24.49 MW 24.49 MW
933292 AC2-141 E 50/50 10.45 MW 10.45 MW
939411 AE1-173 C 50/50 72.81 MW 72.81 MW
939412 AE1-173 E 50/50 48.54 MW 48.54 MW
934012 AD1-025 E Adder 7.91 MW 6.72 MW
314632 6AYDLETT TAP Adder 1.08 MW 0.92 MW
316160 AE1-175 E Adder 0.91 MW 0.77 MW
316164 AC1-076_C 50/50 0.82 MW 0.82 MW
316169 AC1-164 GEN Adder 29.72 MW 25.26 MW
316192 AB2-158 C 50/50 1.84 MW 1.84 MW
316233 AE1-074 C 50/50 2.08 MW 2.08 MW
316240 AF1-291 C Adder 1.72 MW 1.46 MW
316294 AC1-161 C 50/50 3.99 MW 3.99 MW
926785 AC1-164_E Adder 9.81 MW 8.34 MW
934065 AD1-033 E Adder 4.03 MW 3.42 MW
937226 AE2-253 E Adder 4.68 MW 3.98 MW
926004 AC1-076_E 50/50 4.68 MW 4.68 MW
919153 AA1-139 E2 Adder 3.27 MW 2.78 MW
919152 AA1-139 E1 Adder 3.27 MW 2.78 MW
924814 AB2-134 E Adder 10.01 MW 8.51 MW
316084 AB2-161 E Adder 4.45 MW 3.78 MW
316044 AC1-158 C1 50/50 14.73 MW 14.73 MW
316045 AC1-158 C2 50/50 14.73 MW 14.73 MW
926739 AC1-158 E1 50/50 38.53 MW 38.53 MW
926740 AC1-158 E2 50/50 38.53 MW 38.53 MW
932046 AC2-012 E Adder 10.54 MW 8.96 MW
316311 AC2-079 C Adder 4.6 MW 3.91 MW
932596 AC2-079 E Adder 7.5 MW 6.38 MW
934576 AD1-082 E Adder 3.54 MW 3.01 MW
316349 AD2-085 C Adder 2.76 MW 2.35 MW
936666 AD2-085 E Adder 4.5 MW 3.83 MW
961611 AG1-000B C Adder 12.63 MW 10.74 MW
941591 AE2-156 C Adder 14.4 MW 12.24 MW
944581 AF1-123 C 50/50 36.6 MW 36.6 MW
944582 AF1-123 E 50/50 83.81 MW 83.81 MW
944591 AF1-124 C 50/50 36.73 MW 36.73 MW
944592 AF1-124 E 50/50 84.11 MW 84.11 MW
944601 AF1-125 C 50/50 36.03 MW 36.03 MW
944602 AF1-125 E 50/50 82.49 MW 82.49 MW
944631 AF1-128 C Adder 30.46 MW 25.89 MW
965281 AG1-393 C Adder 1.72 MW 1.46 MW
965282 AG1-393 E Adder 1.15 MW 0.97 MW
935161 AD1-151 C Adder 12.75 MW 10.84 MW
935162 AD1-151 E Adder 8.5 MW 7.23 MW
938531 AE1-072 C Adder 14.06 MW 11.95 MW
938532 AE1-072 E Adder 7.33 MW 6.23 MW
939191 AE1-149 C 50/50 8.65 MW 8.65 MW
939192 AE1-149 E 50/50 5.76 MW 5.76 MW
940431 AE2-027 C Adder 10.3 MW 8.75 MW
940432 AE2-027 E Adder 6.86 MW 5.83 MW
940481 AE2-033 C Adder 12.65 MW 10.75 MW
940482 AE2-033 E Adder 8.53 MW 7.25 MW
940541 AE2-040 C Adder 2.25 MW 1.91 MW
940641 AE2-051 C 50/50 13.88 MW 13.88 MW
940642 AE2-051 E 50/50 9.26 MW 9.26 MW
941101 AE2-104 C Adder 2.68 MW 2.28 MW
941102 AE2-104 E Adder 4.26 MW 3.62 MW
944641 AF1-129 C Adder 81.38 MW 69.17 MW
315085 1SPRUNCC 50/50 0.13 MW 0.13 MW
315086 1SPRUNCD 50/50 0.13 MW 0.13 MW
316303 AF2-085 50/50 3.29 MW 3.29 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 18.45 MW 18.45 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 15.61 MW 15.61 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 69.26 MW 69.26 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.28 MW 4.28 MW
NY PJM->LTFIMP_NY CLTF 2.05 MW 2.05 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.83 MW 0.83 MW
WEC LTFEXP_WEC->PJM CLTF 0.4 MW 0.4 MW
CPLE LTFEXP_CPLE->PJM CLTF 8.21 MW 8.21 MW
TVA LTFEXP_TVA->PJM CLTF 4.39 MW 4.39 MW
MEC LTFEXP_MEC->PJM CLTF 2.58 MW 2.58 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.5 MW 5.5 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.16 MW 0.16 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 27.29 MW 27.29 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 3.91 MW 3.91 MW

Details for 8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 573_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line
314911 to 314905 ckt 1
Contingency Name:
DVP_P1-2: LN 573_SRT-A
CONTINGENCY 'DVP_P1-2: LN 573_SRT-A'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 103.76 %
Rating: 4070.2 MVA
Rating Type: B
MVA to Mitigate: 4223.17 MVA
MW Contribution: 161.57 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C Adder 5.43 MW 4.62 MW
963042 AG1-153 E Adder 8.15 MW 6.93 MW
314541 3WATKINS Adder 0.73 MW 0.62 MW
920042 AA2-088 E OP Adder 10.98 MW 9.34 MW
944011 AF1-069 C Adder 12.72 MW 10.81 MW
944012 AF1-069 E Adder 4.94 MW 4.2 MW
940492 AE2-034 E Adder 3.25 MW 2.77 MW
941031 AE2-094 C Adder 38.92 MW 33.08 MW
941032 AE2-094 E Adder 17.43 MW 14.82 MW
314539 3UNCAMP Adder 6.45 MW 5.49 MW
916042 Z1-036 E Adder 30.55 MW 25.97 MW
938771 AE1-103 C Adder 3.12 MW 2.65 MW
938772 AE1-103 E Adder 4.31 MW 3.67 MW
314229 6MT RD221 50/50 0.14 MW 0.14 MW
314236 6NRTHEST 50/50 0.21 MW 0.21 MW
314331 6POE Adder 1.49 MW 1.27 MW
314507 3THOMPSN Adder 2.22 MW 1.89 MW
314525 6KINGFORK Adder 1.12 MW 0.95 MW
314550 6HICKORY Adder 2.39 MW 2.03 MW
315039 1LDYSMT3 50/50 5.54 MW 5.54 MW
315040 1LDYSMT4 50/50 5.56 MW 5.56 MW
315041 1LDYSMT5 50/50 5.57 MW 5.57 MW
315060 1CHESTF5 Adder 71.67 MW 60.92 MW
315065 1CHESTF6 Adder 22.12 MW 18.8 MW
315070 1DARBY 4 50/50 2.91 MW 2.91 MW
315073 1STONECA Adder 7.78 MW 6.61 MW
315083 1SPRUNCA Adder 10.3 MW 8.75 MW
315084 1SPRUNCB Adder 10.3 MW 8.75 MW
315092 1YORKTN3 Adder 147.8 MW 125.63 MW
925865 AC1-065 E Adder 18.28 MW 15.54 MW
926412 AC1-112 E 50/50 1.28 MW 1.28 MW
926662 AC1-147 E Adder 1.46 MW 1.24 MW
926755 AC1-161 E Adder 14.31 MW 12.17 MW
927226 AC1-216 E Adder 8.65 MW 7.35 MW
934392 AD1-063 E Adder 1.18 MW 1.0 MW
935112 AD1-144 E Adder 1.04 MW 0.88 MW
936591 AD2-074 C Adder 6.06 MW 5.15 MW
936592 AD2-074 E Adder 9.89 MW 8.41 MW
942341 AE2-247 C Adder 1.63 MW 1.39 MW
942342 AE2-247 E Adder 2.26 MW 1.92 MW
943461 AF1-017 C Adder 1.48 MW 1.26 MW
943462 AF1-017 E Adder 2.41 MW 2.05 MW
943612 AF1-032 E Adder 1.01 MW 0.86 MW
943741 AF1-042 C Adder 3.17 MW 2.7 MW
943742 AF1-042 E Adder 5.18 MW 4.4 MW
961951 AG1-038 C Adder 3.51 MW 2.98 MW
961952 AG1-038 E Adder 4.84 MW 4.12 MW
966661 AG1-536 C Adder 5.85 MW 4.97 MW
966662 AG1-536 E Adder 7.86 MW 6.68 MW
966871 AG1-558 C Adder 2.72 MW 2.31 MW
966872 AG1-558 E Adder 1.37 MW 1.16 MW
966881 AG1-559 C 50/50 2.84 MW 2.84 MW
966882 AG1-559 E 50/50 1.43 MW 1.43 MW
315225 1N ANNA1 50/50 40.89 MW 40.89 MW
315226 1N ANNA2 50/50 40.9 MW 40.9 MW
315260 1GOSPORTA Adder 2.34 MW 1.99 MW
315261 1GOSPORTB Adder 2.99 MW 2.54 MW
315262 1GOSPORTC Adder 2.54 MW 2.16 MW
316076 AC2-137 E Adder 1.51 MW 1.28 MW
316078 AC2-138 E Adder 1.0 MW 0.85 MW
316157 AD2-030 E Adder 1.3 MW 1.11 MW
913392 Y1-086 E Adder 2.39 MW 2.03 MW
916192 Z1-068 E Adder 2.06 MW 1.75 MW
923832 AB2-022 E Adder 1.35 MW 1.15 MW
923842 AB2-024 E Adder 1.97 MW 1.68 MW
923852 AB2-025 E Adder 1.19 MW 1.01 MW
930122 AB1-027 E 50/50 1.57 MW 1.57 MW
938552 AE1-074 E Adder 1.38 MW 1.17 MW
939312 AE1-162 E Adder 1.59 MW 1.35 MW
946262 AF1-291 E Adder 1.62 MW 1.38 MW
957411 AF2-035 C 50/50 10.24 MW 10.24 MW
957412 AF2-035 E 50/50 5.12 MW 5.12 MW
957492 AF2-043 E Adder 1.55 MW 1.32 MW
957601 AF2-054 C Adder 2.32 MW 1.97 MW
957602 AF2-054 E Adder 1.55 MW 1.31 MW
962861 AG1-135 C Adder 6.6 MW 5.61 MW
962862 AG1-135 E Adder 4.4 MW 3.74 MW
962962 AG1-145 E Adder 1.62 MW 1.37 MW
962971 AG1-146 C Adder 3.37 MW 2.86 MW
962972 AG1-146 E Adder 2.25 MW 1.91 MW
962981 AG1-147 C Adder 7.86 MW 6.68 MW
962982 AG1-147 E Adder 5.24 MW 4.45 MW
963051 AG1-154 C 50/50 4.26 MW 4.26 MW
963052 AG1-154 E 50/50 6.39 MW 6.39 MW
963611 AG1-210 C Adder 0.71 MW 0.6 MW
963612 AG1-210 E Adder 1.07 MW 0.91 MW
964211 AG1-282 C Adder 2.17 MW 1.84 MW
964212 AG1-282 E Adder 1.44 MW 1.23 MW
901082 W1-029 E Adder 34.48 MW 29.31 MW
917122 Z2-027 E Adder 1.46 MW 1.24 MW
925332 AB2-190 E Adder 9.06 MW 7.7 MW
925522 AC1-027 E Adder 1.34 MW 1.14 MW
942001 AE2-212 C Adder 2.41 MW 2.04 MW
942002 AE2-212 E Adder 1.6 MW 1.36 MW
957832 AF2-077 E Adder 1.58 MW 1.34 MW
957871 AF2-081 C Adder 10.91 MW 9.27 MW
957872 AF2-081 E Adder 4.68 MW 3.97 MW
958161 AF2-110 C Adder 1.49 MW 1.27 MW
958162 AF2-110 E Adder 2.37 MW 2.02 MW
313811 6ELKO L286 Adder 1.57 MW 1.34 MW
314181 3NORNECK Adder 0.95 MW 0.81 MW
933291 AC2-141 C Adder 33.53 MW 28.5 MW
933292 AC2-141 E Adder 14.31 MW 12.17 MW
939411 AE1-173 C Adder 93.78 MW 79.71 MW
939412 AE1-173 E Adder 62.52 MW 53.14 MW
934012 AD1-025 E Adder 11.2 MW 9.52 MW
927041 AC1-191 C Adder 10.92 MW 9.28 MW
927042 AC1-191 E Adder 5.44 MW 4.62 MW
313053 6PAPERMILL Adder 7.29 MW 6.2 MW
314594 6PLYMOUTH TP Adder 0.34 MW 0.29 MW
314632 6AYDLETT TAP Adder 1.48 MW 1.26 MW
316004 AC1-112 C 50/50 0.37 MW 0.37 MW
316160 AE1-175 E Adder 1.33 MW 1.13 MW
316169 AC1-164 GEN Adder 45.35 MW 38.55 MW
316233 AE1-074 C Adder 2.74 MW 2.33 MW
316240 AF1-291 C Adder 2.43 MW 2.06 MW
316312 AB1-027 C 50/50 0.6 MW 0.6 MW
926785 AC1-164_E Adder 20.38 MW 17.32 MW
934065 AD1-033 E Adder 5.5 MW 4.67 MW
937226 AE2-253 E Adder 6.38 MW 5.43 MW
939612 AE1-191 E Adder 6.25 MW 5.31 MW
315037 1LDYSMT1 50/50 5.33 MW 5.33 MW
315038 1LDYSMT2 50/50 5.4 MW 5.4 MW
315051 AA1-145 CT1 50/50 5.75 MW 5.75 MW
315052 AA1-145 CT2 50/50 5.75 MW 5.75 MW
939246 AE1-155 E Adder 9.47 MW 8.05 MW
919153 AA1-139 E2 Adder 4.46 MW 3.79 MW
919152 AA1-139 E1 Adder 4.46 MW 3.79 MW
920692 AA2-178 E Adder 4.34 MW 3.69 MW
924814 AB2-134 E Adder 14.16 MW 12.04 MW
316084 AB2-161 E Adder 6.1 MW 5.18 MW
932046 AC2-012 E Adder 14.42 MW 12.26 MW
316311 AC2-079 C Adder 6.28 MW 5.34 MW
932596 AC2-079 E Adder 10.24 MW 8.71 MW
934146 AD1-041 E Adder 3.91 MW 3.32 MW
934576 AD1-082 E Adder 4.86 MW 4.13 MW
316349 AD2-085 C Adder 3.77 MW 3.21 MW
936666 AD2-085 E Adder 6.15 MW 5.23 MW
961611 AG1-000B C Adder 17.76 MW 15.09 MW
941591 AE2-156 C Adder 19.7 MW 16.75 MW
944581 AF1-123 C Adder 49.89 MW 42.41 MW
944582 AF1-123 E Adder 114.24 MW 97.11 MW
944591 AF1-124 C Adder 50.07 MW 42.56 MW
944592 AF1-124 E Adder 114.66 MW 97.46 MW
944601 AF1-125 C Adder 49.12 MW 41.75 MW
944602 AF1-125 E Adder 112.45 MW 95.58 MW
944631 AF1-128 C Adder 44.85 MW 38.12 MW
958261 AF2-120 C Adder 6.8 MW 5.78 MW
958262 AF2-120 E Adder 4.53 MW 3.85 MW
965281 AG1-393 C Adder 2.41 MW 2.05 MW
965282 AG1-393 E Adder 1.61 MW 1.37 MW
934501 AD1-074 C Adder 25.02 MW 21.27 MW
935161 AD1-151 C Adder 18.09 MW 15.38 MW
935162 AD1-151 E Adder 12.06 MW 10.25 MW
938531 AE1-072 C Adder 19.16 MW 16.29 MW
938532 AE1-072 E Adder 9.99 MW 8.49 MW
939191 AE1-149 C Adder 11.88 MW 10.1 MW
939192 AE1-149 E Adder 7.92 MW 6.73 MW
939261 AE1-157 C 50/50 16.59 MW 16.59 MW
939262 AE1-157 E 50/50 9.0 MW 9.0 MW
939602 AE1-190 E Adder 1.56 MW 1.33 MW
940431 AE2-027 C Adder 14.5 MW 12.32 MW
940432 AE2-027 E Adder 9.66 MW 8.21 MW
940481 AE2-033 C Adder 16.56 MW 14.08 MW
940482 AE2-033 E Adder 11.17 MW 9.49 MW
940541 AE2-040 C Adder 2.94 MW 2.5 MW
940551 AE2-041 C Adder 7.85 MW 6.67 MW
940641 AE2-051 C Adder 17.56 MW 14.92 MW
940642 AE2-051 E Adder 11.7 MW 9.95 MW
941101 AE2-104 C Adder 3.66 MW 3.11 MW
941102 AE2-104 E Adder 5.81 MW 4.94 MW
943471 AF1-018 C Adder 7.85 MW 6.67 MW
944641 AF1-129 C Adder 115.36 MW 98.05 MW
315043 1FOUR RIVERA 50/50 3.61 MW 3.61 MW
315044 1FOUR RIVERB 50/50 3.61 MW 3.61 MW
315045 1FOUR RIVERC 50/50 4.41 MW 4.41 MW
315046 1FOUR RIVERD 50/50 3.56 MW 3.56 MW
315047 1FOUR RIVERE 50/50 3.56 MW 3.56 MW
315048 1FOUR RIVERF 50/50 4.34 MW 4.34 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 31.53 MW 31.53 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 23.04 MW 23.04 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 92.19 MW 92.19 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.64 MW 5.64 MW
NY PJM->LTFIMP_NY CLTF 2.67 MW 2.67 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.35 MW 1.35 MW
WEC LTFEXP_WEC->PJM CLTF 0.67 MW 0.67 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.75 MW 10.75 MW
TVA LTFEXP_TVA->PJM CLTF 6.28 MW 6.28 MW
MEC LTFEXP_MEC->PJM CLTF 4.06 MW 4.06 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.84 MW 7.84 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.26 MW 0.26 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 35.97 MW 35.97 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.13 MW 5.13 MW

Details for 8CHANCE-8BRISTER 500.0 kV Ckt 1 line l/o DVP_P1-2: LN 594_SRT-S


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8CHANCE-8BRISTER 500.0 kV Ckt 1 line
314905 to 314900 ckt 1
Contingency Name:
DVP_P1-2: LN 594_SRT-S
CONTINGENCY 'DVP_P1-2: LN 594_SRT-S'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1                /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314900 TO BUS 314916 CKT 1 /*8BRISTER     500.0 - 8MORRSVL     500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 103.7 %
Rating: 4070.2 MVA
Rating Type: B
MVA to Mitigate: 4220.84 MVA
MW Contribution: 158.5 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
963041 AG1-153 C Adder 5.34 MW 4.54 MW
963042 AG1-153 E Adder 8.01 MW 6.81 MW
314541 3WATKINS Adder 0.72 MW 0.61 MW
944011 AF1-069 C Adder 12.5 MW 10.62 MW
944012 AF1-069 E Adder 4.85 MW 4.13 MW
941031 AE2-094 C Adder 38.24 MW 32.51 MW
941032 AE2-094 E Adder 17.13 MW 14.56 MW
314539 3UNCAMP Adder 6.34 MW 5.38 MW
916042 Z1-036 E Adder 29.98 MW 25.48 MW
938771 AE1-103 C Adder 3.07 MW 2.61 MW
938772 AE1-103 E Adder 4.23 MW 3.6 MW
314229 6MT RD221 50/50 0.14 MW 0.14 MW
314236 6NRTHEST 50/50 0.21 MW 0.21 MW
314331 6POE Adder 1.46 MW 1.24 MW
314507 3THOMPSN Adder 2.18 MW 1.85 MW
314525 6KINGFORK Adder 1.09 MW 0.93 MW
314550 6HICKORY Adder 2.34 MW 1.99 MW
315039 1LDYSMT3 50/50 5.39 MW 5.39 MW
315040 1LDYSMT4 50/50 5.4 MW 5.4 MW
315041 1LDYSMT5 50/50 5.42 MW 5.42 MW
315060 1CHESTF5 Adder 70.23 MW 59.7 MW
315065 1CHESTF6 Adder 21.69 MW 18.43 MW
315070 1DARBY 4 50/50 2.85 MW 2.85 MW
315073 1STONECA Adder 7.62 MW 6.48 MW
315083 1SPRUNCA Adder 10.1 MW 8.59 MW
315084 1SPRUNCB Adder 10.1 MW 8.59 MW
315092 1YORKTN3 Adder 144.86 MW 123.13 MW
925865 AC1-065 E Adder 17.89 MW 15.21 MW
926412 AC1-112 E 50/50 1.25 MW 1.25 MW
926662 AC1-147 E Adder 1.43 MW 1.22 MW
926755 AC1-161 E Adder 14.04 MW 11.94 MW
927226 AC1-216 E Adder 8.48 MW 7.21 MW
934392 AD1-063 E Adder 1.15 MW 0.98 MW
935112 AD1-144 E Adder 1.02 MW 0.86 MW
936591 AD2-074 C Adder 5.93 MW 5.04 MW
936592 AD2-074 E Adder 9.67 MW 8.22 MW
942341 AE2-247 C Adder 1.6 MW 1.36 MW
942342 AE2-247 E Adder 2.21 MW 1.88 MW
943461 AF1-017 C Adder 1.45 MW 1.23 MW
943462 AF1-017 E Adder 2.37 MW 2.01 MW
943612 AF1-032 E Adder 0.99 MW 0.84 MW
943741 AF1-042 C Adder 3.1 MW 2.64 MW
943742 AF1-042 E Adder 5.06 MW 4.3 MW
961951 AG1-038 C Adder 3.43 MW 2.91 MW
961952 AG1-038 E Adder 4.73 MW 4.02 MW
966661 AG1-536 C Adder 5.72 MW 4.86 MW
966662 AG1-536 E Adder 7.68 MW 6.53 MW
966871 AG1-558 C Adder 2.66 MW 2.26 MW
966872 AG1-558 E Adder 1.34 MW 1.14 MW
966881 AG1-559 C 50/50 2.77 MW 2.77 MW
966882 AG1-559 E 50/50 1.39 MW 1.39 MW
315225 1N ANNA1 50/50 40.26 MW 40.26 MW
315226 1N ANNA2 50/50 40.27 MW 40.27 MW
315260 1GOSPORTA Adder 2.3 MW 1.95 MW
315261 1GOSPORTB Adder 2.94 MW 2.5 MW
315262 1GOSPORTC Adder 2.49 MW 2.12 MW
316076 AC2-137 E Adder 1.48 MW 1.25 MW
316157 AD2-030 E Adder 1.28 MW 1.08 MW
913392 Y1-086 E Adder 2.34 MW 1.99 MW
916192 Z1-068 E Adder 2.02 MW 1.72 MW
923832 AB2-022 E Adder 1.32 MW 1.12 MW
923842 AB2-024 E Adder 1.93 MW 1.64 MW
923852 AB2-025 E Adder 1.17 MW 0.99 MW
930122 AB1-027 E 50/50 1.54 MW 1.54 MW
938552 AE1-074 E Adder 1.36 MW 1.15 MW
939312 AE1-162 E Adder 1.56 MW 1.32 MW
946262 AF1-291 E Adder 1.59 MW 1.35 MW
957411 AF2-035 C 50/50 9.98 MW 9.98 MW
957412 AF2-035 E 50/50 4.99 MW 4.99 MW
957492 AF2-043 E Adder 1.52 MW 1.29 MW
957601 AF2-054 C Adder 2.27 MW 1.93 MW
957602 AF2-054 E Adder 1.51 MW 1.29 MW
962861 AG1-135 C Adder 6.46 MW 5.49 MW
962862 AG1-135 E Adder 4.3 MW 3.66 MW
962962 AG1-145 E Adder 1.58 MW 1.35 MW
962971 AG1-146 C Adder 3.29 MW 2.8 MW
962972 AG1-146 E Adder 2.2 MW 1.87 MW
962981 AG1-147 C Adder 7.69 MW 6.53 MW
962982 AG1-147 E Adder 5.12 MW 4.36 MW
963051 AG1-154 C 50/50 4.14 MW 4.14 MW
963052 AG1-154 E 50/50 6.22 MW 6.22 MW
901082 W1-029 E Adder 33.83 MW 28.75 MW
917122 Z2-027 E Adder 1.43 MW 1.21 MW
925332 AB2-190 E Adder 8.88 MW 7.55 MW
925522 AC1-027 E Adder 1.31 MW 1.11 MW
942001 AE2-212 C Adder 2.36 MW 2.01 MW
942002 AE2-212 E Adder 1.57 MW 1.34 MW
957832 AF2-077 E Adder 1.55 MW 1.31 MW
957871 AF2-081 C Adder 10.7 MW 9.1 MW
957872 AF2-081 E Adder 4.59 MW 3.9 MW
958161 AF2-110 C Adder 1.46 MW 1.24 MW
958162 AF2-110 E Adder 2.33 MW 1.98 MW
313811 6ELKO L286 Adder 1.54 MW 1.31 MW
933291 AC2-141 C Adder 32.89 MW 27.96 MW
933292 AC2-141 E Adder 14.04 MW 11.94 MW
939411 AE1-173 C Adder 92.07 MW 78.26 MW
939412 AE1-173 E Adder 61.38 MW 52.17 MW
934012 AD1-025 E Adder 10.98 MW 9.33 MW
927041 AC1-191 C Adder 10.68 MW 9.08 MW
927042 AC1-191 E Adder 5.32 MW 4.52 MW
313053 6PAPERMILL Adder 7.13 MW 6.06 MW
314632 6AYDLETT TAP Adder 1.45 MW 1.23 MW
316004 AC1-112 C 50/50 0.36 MW 0.36 MW
316160 AE1-175 E Adder 1.31 MW 1.11 MW
316169 AC1-164 GEN Adder 44.41 MW 37.75 MW
316233 AE1-074 C Adder 2.69 MW 2.29 MW
316240 AF1-291 C Adder 2.38 MW 2.02 MW
316312 AB1-027 C 50/50 0.58 MW 0.58 MW
926785 AC1-164_E Adder 19.95 MW 16.96 MW
934065 AD1-033 E Adder 5.39 MW 4.58 MW
937226 AE2-253 E Adder 6.26 MW 5.32 MW
939612 AE1-191 E Adder 6.12 MW 5.2 MW
926004 AC1-076_E Adder 4.28 MW 3.64 MW
315037 1LDYSMT1 50/50 5.19 MW 5.19 MW
315038 1LDYSMT2 50/50 5.25 MW 5.25 MW
315051 AA1-145 CT1 50/50 5.62 MW 5.62 MW
315052 AA1-145 CT2 50/50 5.62 MW 5.62 MW
939246 AE1-155 E Adder 9.26 MW 7.87 MW
919153 AA1-139 E2 Adder 4.38 MW 3.72 MW
919152 AA1-139 E1 Adder 4.38 MW 3.72 MW
920692 AA2-178 E Adder 0.86 MW 0.73 MW
924814 AB2-134 E Adder 13.89 MW 11.8 MW
316084 AB2-161 E Adder 5.98 MW 5.08 MW
316044 AC1-158 C1 50/50 7.37 MW 7.37 MW
316045 AC1-158 C2 50/50 7.37 MW 7.37 MW
926739 AC1-158 E1 50/50 19.27 MW 19.27 MW
926740 AC1-158 E2 50/50 19.27 MW 19.27 MW
932046 AC2-012 E Adder 14.14 MW 12.02 MW
316311 AC2-079 C Adder 6.16 MW 5.24 MW
932596 AC2-079 E Adder 10.05 MW 8.54 MW
934146 AD1-041 E Adder 3.82 MW 3.25 MW
934576 AD1-082 E Adder 4.76 MW 4.05 MW
316349 AD2-085 C Adder 3.7 MW 3.14 MW
936666 AD2-085 E Adder 6.03 MW 5.13 MW
961611 AG1-000B C Adder 17.41 MW 14.8 MW
941591 AE2-156 C Adder 19.33 MW 16.43 MW
944581 AF1-123 C Adder 48.94 MW 41.6 MW
944582 AF1-123 E Adder 112.08 MW 95.26 MW
944591 AF1-124 C Adder 49.12 MW 41.75 MW
944592 AF1-124 E Adder 112.48 MW 95.61 MW
944601 AF1-125 C Adder 48.19 MW 40.96 MW
944602 AF1-125 E Adder 110.32 MW 93.77 MW
944631 AF1-128 C Adder 43.94 MW 37.35 MW
958261 AF2-120 C Adder 6.65 MW 5.65 MW
958262 AF2-120 E Adder 4.43 MW 3.77 MW
965281 AG1-393 C Adder 2.36 MW 2.01 MW
965282 AG1-393 E Adder 1.58 MW 1.34 MW
935161 AD1-151 C Adder 17.74 MW 15.08 MW
935162 AD1-151 E Adder 11.83 MW 10.05 MW
938531 AE1-072 C Adder 18.8 MW 15.98 MW
938532 AE1-072 E Adder 9.8 MW 8.33 MW
939191 AE1-149 C Adder 11.66 MW 9.91 MW
939192 AE1-149 E Adder 7.77 MW 6.61 MW
939261 AE1-157 C 50/50 16.16 MW 16.16 MW
939262 AE1-157 E 50/50 8.77 MW 8.77 MW
939602 AE1-190 E Adder 1.53 MW 1.3 MW
940431 AE2-027 C Adder 14.22 MW 12.08 MW
940432 AE2-027 E Adder 9.48 MW 8.05 MW
940481 AE2-033 C Adder 16.26 MW 13.82 MW
940482 AE2-033 E Adder 10.96 MW 9.32 MW
940541 AE2-040 C Adder 2.89 MW 2.46 MW
940551 AE2-041 C Adder 7.68 MW 6.53 MW
940641 AE2-051 C Adder 17.24 MW 14.66 MW
940642 AE2-051 E Adder 11.5 MW 9.77 MW
941101 AE2-104 C Adder 3.59 MW 3.05 MW
941102 AE2-104 E Adder 5.7 MW 4.85 MW
943471 AF1-018 C Adder 7.68 MW 6.53 MW
944641 AF1-129 C Adder 113.11 MW 96.15 MW
315043 1FOUR RIVERA 50/50 3.53 MW 3.53 MW
315044 1FOUR RIVERB 50/50 3.53 MW 3.53 MW
315045 1FOUR RIVERC 50/50 4.31 MW 4.31 MW
315046 1FOUR RIVERD 50/50 3.48 MW 3.48 MW
315047 1FOUR RIVERE 50/50 3.48 MW 3.48 MW
315048 1FOUR RIVERF 50/50 4.25 MW 4.25 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 30.04 MW 30.04 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 22.37 MW 22.37 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 90.49 MW 90.49 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.75 MW 5.75 MW
NY PJM->LTFIMP_NY CLTF 2.72 MW 2.72 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.3 MW 1.3 MW
WEC LTFEXP_WEC->PJM CLTF 0.64 MW 0.64 MW
CPLE LTFEXP_CPLE->PJM CLTF 10.56 MW 10.56 MW
TVA LTFEXP_TVA->PJM CLTF 6.12 MW 6.12 MW
MEC LTFEXP_MEC->PJM CLTF 3.91 MW 3.91 MW
LAGN LTFEXP_LAGN->PJM CLTF 7.64 MW 7.64 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.25 MW 0.25 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 36.64 MW 36.64 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 5.04 MW 5.04 MW

Details for 6THRASHER-6YADKIN 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6THRASHER-6YADKIN 230.0 kV Ckt 1 line
314508 to 314514 ckt 1
Contingency Name:
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 101.07 %
Rating: 818.74 MVA
Rating Type: B
MVA to Mitigate: 827.53 MVA
MW Contribution: 291.43 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.19 MW 0.16 MW
961942 AG1-037 E Adder 0.13 MW 0.11 MW
962331 AG1-082 C Adder 0.75 MW 0.64 MW
962332 AG1-082 E Adder 0.5 MW 0.43 MW
966801 AG1-551 C Adder 0.84 MW 0.72 MW
966802 AG1-551 E Adder 0.44 MW 0.38 MW
965291 AG1-394 C Adder 0.28 MW 0.24 MW
965292 AG1-394 E Adder 0.52 MW 0.45 MW
314541 3WATKINS Adder 0.26 MW 0.22 MW
918532 AA1-067 E Adder 0.24 MW 0.21 MW
920042 AA2-088 E OP Adder 3.61 MW 3.07 MW
934521 AD1-076 C 50/50 8.14 MW 8.14 MW
934522 AD1-076 E 50/50 4.15 MW 4.15 MW
943172 AE2-346 E Adder 0.23 MW 0.19 MW
316141 AB2-099 E Adder 0.09 MW 0.08 MW
900672 V4-068 E Adder 0.12 MW 0.11 MW
940491 AE2-034 C 50/50 0.9 MW 0.9 MW
940492 AE2-034 E 50/50 2.42 MW 2.42 MW
957521 AF2-046 C Adder 5.01 MW 4.26 MW
957522 AF2-046 E Adder 2.53 MW 2.15 MW
314539 3UNCAMP Adder 2.41 MW 2.05 MW
916042 Z1-036 E 50/50 26.86 MW 26.86 MW
938771 AE1-103 C Adder 1.2 MW 1.02 MW
938772 AE1-103 E Adder 1.65 MW 1.4 MW
313526 AB2-022 C 50/50 0.54 MW 0.54 MW
314507 3THOMPSN Adder 0.92 MW 0.78 MW
314525 6KINGFORK Adder 0.38 MW 0.32 MW
314550 6HICKORY 50/50 4.21 MW 4.21 MW
935112 AD1-144 E Adder 0.35 MW 0.3 MW
942341 AE2-247 C Adder 0.53 MW 0.45 MW
942342 AE2-247 E Adder 0.74 MW 0.63 MW
943461 AF1-017 C Adder 0.48 MW 0.41 MW
943462 AF1-017 E Adder 0.79 MW 0.67 MW
943612 AF1-032 E Adder 0.48 MW 0.4 MW
315605 6W1-029WIND 50/50 0.77 MW 0.77 MW
315611 6Z1-036WIND 50/50 0.62 MW 0.62 MW
913392 Y1-086 E 50/50 3.15 MW 3.15 MW
916192 Z1-068 E 50/50 2.7 MW 2.7 MW
923832 AB2-022 E 50/50 1.78 MW 1.78 MW
957492 AF2-043 E Adder 0.73 MW 0.62 MW
901082 W1-029 E 50/50 31.83 MW 31.83 MW
917122 Z2-027 E 50/50 1.76 MW 1.76 MW
925522 AC1-027 E 50/50 1.7 MW 1.7 MW
957871 AF2-081 C 50/50 17.72 MW 17.72 MW
957872 AF2-081 E 50/50 7.59 MW 7.59 MW
958161 AF2-110 C Adder 0.63 MW 0.54 MW
958162 AF2-110 E Adder 1.01 MW 0.85 MW
916191 Z1-068 C 50/50 0.06 MW 0.06 MW
933981 AD1-022 C 50/50 5.28 MW 5.28 MW
933982 AD1-022 E 50/50 2.87 MW 2.87 MW
961681 AG1-008 C Adder 5.01 MW 4.26 MW
961682 AG1-008 E Adder 2.53 MW 2.15 MW
314594 6PLYMOUTH TP 50/50 0.22 MW 0.22 MW
314632 6AYDLETT TAP 50/50 2.29 MW 2.29 MW
316185 AD1-033 C 50/50 2.37 MW 2.37 MW
316316 AC1-027 C 50/50 0.44 MW 0.44 MW
316320 Y1-086 C 50/50 0.32 MW 0.32 MW
316321 Z2-027 C 50/50 0.47 MW 0.47 MW
917332 KELFORD E Adder 0.56 MW 0.47 MW
934065 AD1-033 E 50/50 9.7 MW 9.7 MW
937226 AE2-253 E 50/50 10.71 MW 10.71 MW
918512 AA1-065 E OP Adder 2.35 MW 1.99 MW
316017 AA1-139 ULT1 50/50 1.91 MW 1.91 MW
316018 AA1-139 ULT2 50/50 1.91 MW 1.91 MW
919153 AA1-139 E2 50/50 7.25 MW 7.25 MW
919152 AA1-139 E1 50/50 7.25 MW 7.25 MW
315614 AA2-178 C 50/50 1.22 MW 1.22 MW
920692 AA2-178 E 50/50 3.22 MW 3.22 MW
925122 AB2-169 E Adder 2.94 MW 2.5 MW
316311 AC2-079 C Adder 2.13 MW 1.81 MW
932596 AC2-079 E Adder 3.47 MW 2.95 MW
316349 AD2-085 C Adder 1.23 MW 1.05 MW
936666 AD2-085 E Adder 2.01 MW 1.71 MW
316388 AE2-253 GEN 50/50 3.59 MW 3.59 MW
944581 AF1-123 C 50/50 89.99 MW 89.99 MW
944582 AF1-123 E 50/50 206.06 MW 206.06 MW
944591 AF1-124 C 50/50 90.31 MW 90.31 MW
944592 AF1-124 E 50/50 206.81 MW 206.81 MW
944601 AF1-125 C 50/50 88.6 MW 88.6 MW
944602 AF1-125 E 50/50 202.83 MW 202.83 MW
934501 AD1-074 C 50/50 22.42 MW 22.42 MW
934502 AD1-074 E 50/50 11.41 MW 11.41 MW
934511 AD1-075 C 50/50 5.6 MW 5.6 MW
934512 AD1-075 E 50/50 2.85 MW 2.85 MW
938531 AE1-072 C 50/50 30.04 MW 30.04 MW
938532 AE1-072 E 50/50 15.66 MW 15.66 MW
941101 AE2-104 C Adder 1.55 MW 1.32 MW
941102 AE2-104 E Adder 2.46 MW 2.09 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 2.7 MW 2.7 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.81 MW 1.81 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 8.0 MW 8.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.2 MW 0.2 MW
NY PJM->LTFIMP_NY CLTF 0.09 MW 0.09 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.1 MW 0.1 MW
WEC LTFEXP_WEC->PJM CLTF 0.06 MW 0.06 MW
CPLE LTFEXP_CPLE->PJM CLTF 1.09 MW 1.09 MW
TVA LTFEXP_TVA->PJM CLTF 0.48 MW 0.48 MW
MEC LTFEXP_MEC->PJM CLTF 0.33 MW 0.33 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.61 MW 0.61 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.02 MW 0.02 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 1.27 MW 1.27 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.52 MW 0.52 MW

Details for 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 100.01 %
Rating: 3193.18 MVA
Rating Type: A
MVA to Mitigate: 3193.61 MVA
MW Contribution: 161.15 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
961941 AG1-037 C Adder 0.56 MW 0.47 MW
961942 AG1-037 E Adder 0.37 MW 0.32 MW
962331 AG1-082 C Adder 2.23 MW 1.9 MW
962332 AG1-082 E Adder 1.49 MW 1.26 MW
963041 AG1-153 C 50/50 7.2 MW 7.2 MW
963042 AG1-153 E 50/50 10.8 MW 10.8 MW
964791 AG1-342 C Adder 3.84 MW 3.27 MW
964792 AG1-342 E Adder 2.56 MW 2.18 MW
966811 AG1-552 C Adder 2.3 MW 1.95 MW
966812 AG1-552 E Adder 1.09 MW 0.93 MW
965291 AG1-394 C Adder 0.94 MW 0.8 MW
965292 AG1-394 E Adder 1.74 MW 1.48 MW
966621 AG1-532 C 50/50 1.59 MW 1.59 MW
966622 AG1-532 E 50/50 1.06 MW 1.06 MW
314541 3WATKINS Adder 0.76 MW 0.65 MW
314572 3EMPORIA 50/50 0.49 MW 0.49 MW
315153 1CLOVER1 50/50 14.98 MW 14.98 MW
315154 1CLOVER2 50/50 14.84 MW 14.84 MW
918492 AA1-063AE OP Adder 4.54 MW 3.86 MW
919692 AA2-053 E OP Adder 4.71 MW 4.0 MW
920042 AA2-088 E OP Adder 11.73 MW 9.97 MW
925785 AC1-054 E Adder 3.82 MW 3.25 MW
927146 AC1-208 E Adder 4.43 MW 3.76 MW
934521 AD1-076 C Adder 13.43 MW 11.42 MW
934522 AD1-076 E Adder 6.85 MW 5.82 MW
943172 AE2-346 E Adder 0.67 MW 0.57 MW
944011 AF1-069 C 50/50 16.99 MW 16.99 MW
944012 AF1-069 E 50/50 6.6 MW 6.6 MW
959311 AF2-222 C Adder 11.36 MW 9.65 MW
960081 AF2-299 C 50/50 2.12 MW 2.12 MW
960082 AF2-299 E 50/50 1.41 MW 1.41 MW
316141 AB2-099 E Adder 0.28 MW 0.24 MW
900672 V4-068 E Adder 0.39 MW 0.34 MW
923263 AB1-132 E OP Adder 6.86 MW 5.83 MW
923573 AB1-173 E OP Adder 3.7 MW 3.14 MW
924162 AB2-060 E OP Adder 4.67 MW 3.97 MW
924302 AB2-077 E O1 Adder 1.46 MW 1.24 MW
924312 AB2-078 E O1 Adder 1.46 MW 1.24 MW
924322 AB2-079 E O1 Adder 1.46 MW 1.24 MW
925612 AC1-036 E Adder 0.92 MW 0.78 MW
939181 AE1-148 C Adder 9.97 MW 8.48 MW
939182 AE1-148 E Adder 6.65 MW 5.65 MW
940492 AE2-034 E Adder 3.38 MW 2.87 MW
941031 AE2-094 C 50/50 51.99 MW 51.99 MW
941032 AE2-094 E 50/50 23.29 MW 23.29 MW
946281 AF1-292 C 50/50 1.75 MW 1.75 MW
946282 AF1-292 E 50/50 1.17 MW 1.17 MW
957481 AF2-042 C 50/50 65.11 MW 65.11 MW
957482 AF2-042 E 50/50 43.41 MW 43.41 MW
957521 AF2-046 C Adder 15.69 MW 13.34 MW
957522 AF2-046 E Adder 7.93 MW 6.74 MW
314539 3UNCAMP Adder 6.68 MW 5.68 MW
916042 Z1-036 E Adder 31.25 MW 26.56 MW
938771 AE1-103 C Adder 3.21 MW 2.73 MW
938772 AE1-103 E Adder 4.44 MW 3.77 MW
933502 AC2-165 E 50/50 8.47 MW 8.47 MW
314331 6POE 50/50 1.52 MW 1.52 MW
314507 3THOMPSN Adder 2.19 MW 1.86 MW
314525 6KINGFORK Adder 1.08 MW 0.92 MW
314550 6HICKORY 50/50 2.37 MW 2.37 MW
315083 1SPRUNCA Adder 9.28 MW 7.89 MW
315084 1SPRUNCB Adder 9.28 MW 7.89 MW
926662 AC1-147 E Adder 1.44 MW 1.22 MW
926755 AC1-161 E 50/50 14.05 MW 14.05 MW
935112 AD1-144 E Adder 1.0 MW 0.85 MW
942341 AE2-247 C Adder 1.62 MW 1.37 MW
942342 AE2-247 E Adder 2.23 MW 1.9 MW
943461 AF1-017 C Adder 1.46 MW 1.24 MW
943462 AF1-017 E Adder 2.39 MW 2.03 MW
943612 AF1-032 E Adder 1.01 MW 0.85 MW
958502 AF2-144 E 50/50 1.44 MW 1.44 MW
315102 1BRUNSWICKG1 50/50 10.59 MW 10.59 MW
315103 1BRUNSWICKG2 50/50 10.59 MW 10.59 MW
315104 1BRUNSWICKG3 50/50 10.59 MW 10.59 MW
315105 1BRUNSWICKS1 50/50 22.0 MW 22.0 MW
315108 1ELIZAR1 50/50 3.46 MW 3.46 MW
315110 1ELIZAR3 50/50 3.5 MW 3.5 MW
315241 1Z1-086 GT1 50/50 13.58 MW 13.58 MW
315242 1Z1-086 GT2 50/50 13.58 MW 13.58 MW
315243 1Z1-086 GT3 50/50 13.58 MW 13.58 MW
315244 1Z1-086 ST 50/50 23.64 MW 23.64 MW
315260 1GOSPORTA Adder 2.31 MW 1.96 MW
315261 1GOSPORTB Adder 2.95 MW 2.5 MW
315262 1GOSPORTC Adder 2.5 MW 2.13 MW
913392 Y1-086 E Adder 2.4 MW 2.04 MW
916192 Z1-068 E 50/50 2.04 MW 2.04 MW
923832 AB2-022 E Adder 1.35 MW 1.15 MW
923852 AB2-025 E 50/50 1.36 MW 1.36 MW
923862 AB2-026 E 50/50 1.47 MW 1.47 MW
938552 AE1-074 E 50/50 1.53 MW 1.53 MW
938562 AE1-075 E 50/50 1.25 MW 1.25 MW
939312 AE1-162 E Adder 1.48 MW 1.25 MW
957492 AF2-043 E Adder 1.55 MW 1.32 MW
901082 W1-029 E Adder 34.77 MW 29.55 MW
917122 Z2-027 E Adder 1.46 MW 1.25 MW
925522 AC1-027 E 50/50 1.32 MW 1.32 MW
942001 AE2-212 C Adder 2.24 MW 1.9 MW
942002 AE2-212 E Adder 1.49 MW 1.27 MW
957871 AF2-081 C 50/50 10.88 MW 10.88 MW
957872 AF2-081 E 50/50 4.66 MW 4.66 MW
958161 AF2-110 C Adder 1.49 MW 1.27 MW
958162 AF2-110 E Adder 2.37 MW 2.01 MW
314722 3TWITTYS Adder 1.02 MW 0.86 MW
926071 AC1-086 C Adder 23.56 MW 20.02 MW
926072 AC1-086 E Adder 10.72 MW 9.11 MW
936261 AD2-033 C Adder 13.97 MW 11.88 MW
936262 AD2-033 E Adder 9.32 MW 7.92 MW
933291 AC2-141 C 50/50 32.91 MW 32.91 MW
933292 AC2-141 E 50/50 14.05 MW 14.05 MW
934621 AD1-088 C 50/50 14.94 MW 14.94 MW
934622 AD1-088 E 50/50 7.03 MW 7.03 MW
939411 AE1-173 C 50/50 113.08 MW 113.08 MW
939412 AE1-173 E 50/50 75.39 MW 75.39 MW
916191 Z1-068 C 50/50 0.05 MW 0.05 MW
933981 AD1-022 C Adder 9.62 MW 8.18 MW
933982 AD1-022 E Adder 5.24 MW 4.45 MW
962572 AG1-106 E Adder 1.33 MW 1.13 MW
961681 AG1-008 C Adder 15.69 MW 13.34 MW
961682 AG1-008 E Adder 7.93 MW 6.74 MW
962571 AG1-106 C Adder 3.05 MW 2.59 MW
314594 6PLYMOUTH TP Adder 0.35 MW 0.3 MW
314632 6AYDLETT TAP Adder 1.48 MW 1.25 MW
316023 AB2-100 C2 50/50 1.09 MW 1.09 MW
316185 AD1-033 C 50/50 1.33 MW 1.33 MW
316233 AE1-074 C 50/50 3.04 MW 3.04 MW
316258 AE1-075 C 50/50 0.41 MW 0.41 MW
316274 AC1-208 C Adder 9.97 MW 8.48 MW
316294 AC1-161 C 50/50 5.36 MW 5.36 MW
316313 AB2-026 C 50/50 0.45 MW 0.45 MW
316315 AB2-025 C 50/50 0.48 MW 0.48 MW
316316 AC1-027 C 50/50 0.34 MW 0.34 MW
316336 AC2-165 C 50/50 11.26 MW 11.26 MW
316365 AB2-100 C1 50/50 1.09 MW 1.09 MW
316405 AF2-144 C 50/50 0.35 MW 0.35 MW
917332 KELFORD E Adder 1.82 MW 1.54 MW
924516 AB2-100 E1 50/50 3.31 MW 3.31 MW
924517 AB2-100 E2 50/50 3.31 MW 3.31 MW
926206 AC1-098 E Adder 4.03 MW 3.43 MW
926214 AC1-099 E Adder 1.33 MW 1.13 MW
934065 AD1-033 E 50/50 5.46 MW 5.46 MW
937226 AE2-253 E 50/50 6.36 MW 6.36 MW
918512 AA1-065 E OP Adder 6.09 MW 5.18 MW
316017 AA1-139 ULT1 50/50 1.17 MW 1.17 MW
316018 AA1-139 ULT2 50/50 1.17 MW 1.17 MW
919153 AA1-139 E2 50/50 4.45 MW 4.45 MW
919152 AA1-139 E1 50/50 4.45 MW 4.45 MW
920692 AA2-178 E Adder 4.5 MW 3.83 MW
923994 AB2-040_E Adder 6.93 MW 5.89 MW
924022 AB2-043 E O1 Adder 5.67 MW 4.82 MW
316084 AB2-161 E Adder 5.94 MW 5.05 MW
925122 AB2-169 E Adder 6.3 MW 5.36 MW
316088 AB2-174 E Adder 7.36 MW 6.25 MW
932046 AC2-012 E Adder 14.2 MW 12.07 MW
316311 AC2-079 C Adder 6.22 MW 5.29 MW
932596 AC2-079 E Adder 10.14 MW 8.62 MW
934576 AD1-082 E Adder 4.74 MW 4.03 MW
316349 AD2-085 C Adder 3.73 MW 3.17 MW
936666 AD2-085 E Adder 6.08 MW 5.17 MW
316388 AE2-253 GEN 50/50 2.13 MW 2.13 MW
941591 AE2-156 C Adder 19.41 MW 16.5 MW
944581 AF1-123 C 50/50 49.76 MW 49.76 MW
944582 AF1-123 E 50/50 113.94 MW 113.94 MW
944591 AF1-124 C 50/50 49.94 MW 49.94 MW
944592 AF1-124 E 50/50 114.35 MW 114.35 MW
944601 AF1-125 C 50/50 48.99 MW 48.99 MW
944602 AF1-125 E 50/50 112.15 MW 112.15 MW
962491 AG1-098 C 50/50 13.35 MW 13.35 MW
962492 AG1-098 E 50/50 8.9 MW 8.9 MW
962561 AG1-105 C Adder 9.65 MW 8.2 MW
962562 AG1-105 E Adder 6.43 MW 5.47 MW
964241 AG1-285 C Adder 13.6 MW 11.56 MW
964242 AG1-285 E Adder 9.06 MW 7.7 MW
965281 AG1-393 C Adder 2.16 MW 1.83 MW
965282 AG1-393 E Adder 1.44 MW 1.22 MW
313764 3SOCKMAN Adder 0.8 MW 0.68 MW
932632 AC2-084 E Adder 3.56 MW 3.03 MW
934321 AD1-056 C Adder 6.92 MW 5.88 MW
934322 AD1-056 E Adder 3.75 MW 3.19 MW
934331 AD1-057 C Adder 3.86 MW 3.28 MW
934332 AD1-057 E Adder 2.01 MW 1.71 MW
934501 AD1-074 C Adder 36.98 MW 31.43 MW
934502 AD1-074 E Adder 18.83 MW 16.0 MW
934511 AD1-075 C Adder 9.25 MW 7.86 MW
934512 AD1-075 E Adder 4.71 MW 4.0 MW
934611 AD1-087 C 50/50 1.47 MW 1.47 MW
934612 AD1-087 E 50/50 4.27 MW 4.27 MW
935171 AD1-152 C 50/50 1.53 MW 1.53 MW
935172 AD1-152 E 50/50 6.3 MW 6.3 MW
937481 AD2-202 C 50/50 0.43 MW 0.43 MW
937482 AD2-202 E 50/50 1.25 MW 1.25 MW
938531 AE1-072 C Adder 19.14 MW 16.27 MW
938532 AE1-072 E Adder 9.98 MW 8.48 MW
939191 AE1-149 C Adder 11.47 MW 9.75 MW
939192 AE1-149 E Adder 7.65 MW 6.5 MW
940481 AE2-033 C 50/50 18.96 MW 18.96 MW
940482 AE2-033 E 50/50 12.78 MW 12.78 MW
940541 AE2-040 C 50/50 3.38 MW 3.38 MW
940641 AE2-051 C 50/50 22.41 MW 22.41 MW
940642 AE2-051 E 50/50 14.94 MW 14.94 MW
941101 AE2-104 C Adder 3.65 MW 3.1 MW
941102 AE2-104 E Adder 5.8 MW 4.93 MW
316303 AF2-085 50/50 5.38 MW 5.38 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 43.03 MW 43.03 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 28.14 MW 28.14 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 109.32 MW 109.32 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 4.58 MW 4.58 MW
NY PJM->LTFIMP_NY CLTF 2.1 MW 2.1 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.71 MW 1.71 MW
WEC LTFEXP_WEC->PJM CLTF 0.89 MW 0.89 MW
CPLE LTFEXP_CPLE->PJM CLTF 12.88 MW 12.88 MW
TVA LTFEXP_TVA->PJM CLTF 7.44 MW 7.44 MW
MEC LTFEXP_MEC->PJM CLTF 5.18 MW 5.18 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.38 MW 9.38 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.33 MW 0.33 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 29.16 MW 29.16 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 6.14 MW 6.14 MW

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Light Load Analysis

The New Service Request was evaluated as a 820.0 MW injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential light load period network impacts were as follows:

The following flowgates remain after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Single AC 113.24 % 678.68 B 768.53 33.71
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 106.62 % 678.68 B 723.58 36.97
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Single AC 112.77 % 678.68 B 765.38 33.71
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 106.15 % 678.68 B 720.45 36.97
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 271_SRT-A
CONTINGENCY 'DVP_P1-2: LN 271_SRT-A'
 OPEN BRANCH FROM BUS 314481 TO BUS 316171 CKT 1   /*6LANDSTN     230.0 - 6POCATY      230.0
END
Single AC 111.03 % 678.68 B 753.55 165.62
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 2240_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2240_SRT-A'
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1   /*6FENTRES     230.0 - 6POCATY      230.0
END
Single AC 111.03 % 678.68 B 753.53 165.62

Details for 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 113.24 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 768.53 MVA
MW Contribution: 33.71 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 127.79 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 867.27 MVA
MW Contribution: 39.41 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.1 MW 8.1 MW
315065 1CHESTF6 80/20 3.53 MW 3.53 MW
315083 1SPRUNCA 80/20 1.44 MW 1.44 MW
315084 1SPRUNCB 80/20 1.44 MW 1.44 MW
315605 6W1-029WIND 80/20 0.55 MW 0.55 MW
315611 6Z1-036WIND 80/20 1.0 MW 1.0 MW
901082 W1-029 E 80/20 3.7 MW 3.7 MW
916042 Z1-036 E 80/20 6.68 MW 6.68 MW
916192 Z1-068 E 80/20 0.22 MW 0.22 MW
941032 AE2-094 E 80/20 11.84 MW 11.84 MW
944012 AF1-069 E 80/20 3.87 MW 3.87 MW
961942 AG1-037 E 80/20 0.09 MW 0.09 MW
962332 AG1-082 E 80/20 0.35 MW 0.35 MW
963041 AG1-153 C 80/20 1.73 MW 1.73 MW
963042 AG1-153 E 80/20 2.6 MW 2.6 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.54 MW 1.54 MW
940541 AE2-040 C 80/20 0.88 MW 0.88 MW
941591 AE2-156 C 80/20 5.14 MW 5.14 MW
943571 AF1-028 C Adder -15.77 MW -13.4 MW
944581 AF1-123 C 80/20 10.41 MW 10.41 MW
944582 AF1-123 E 80/20 23.83 MW 23.83 MW
944591 AF1-124 C 80/20 10.44 MW 10.44 MW
944592 AF1-124 E 80/20 23.92 MW 23.92 MW
944601 AF1-125 C 80/20 10.25 MW 10.25 MW
944602 AF1-125 E 80/20 23.46 MW 23.46 MW
944631 AF1-128 C 80/20 21.16 MW 21.16 MW
944641 AF1-129 C 80/20 30.65 MW 30.65 MW
961612 AG1-000B E 80/20 2.31 MW 2.31 MW
316303 AF2-085 80/20 1.84 MW 1.84 MW
943573 AF1-028 BT 80/20 15.77 MW 15.77 MW
958502 AF2-144 E Adder 2.83 MW 2.41 MW

Details for 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 106.62 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 723.58 MVA
MW Contribution: 36.97 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 120.31 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 816.55 MVA
MW Contribution: 40.74 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 80/20 3.64 MW 3.64 MW
315083 1SPRUNCA 80/20 1.51 MW 1.51 MW
315084 1SPRUNCB 80/20 1.51 MW 1.51 MW
315131 1EDGECMA 80/20 2.39 MW 2.39 MW
315605 6W1-029WIND 80/20 0.61 MW 0.61 MW
315611 6Z1-036WIND 80/20 1.11 MW 1.11 MW
901082 W1-029 E 80/20 4.09 MW 4.09 MW
916042 Z1-036 E 80/20 7.45 MW 7.45 MW
916192 Z1-068 E 80/20 0.24 MW 0.24 MW
941032 AE2-094 E 80/20 14.5 MW 14.5 MW
944012 AF1-069 E 80/20 4.74 MW 4.74 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.4 MW 0.4 MW
963041 AG1-153 C 80/20 2.11 MW 2.11 MW
963042 AG1-153 E 80/20 3.16 MW 3.16 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.61 MW 1.61 MW
940541 AE2-040 C 80/20 1.01 MW 1.01 MW
941591 AE2-156 C 80/20 5.61 MW 5.61 MW
943571 AF1-028 C Adder -12.01 MW -10.21 MW
944581 AF1-123 C 80/20 11.41 MW 11.41 MW
944582 AF1-123 E 80/20 26.14 MW 26.14 MW
944591 AF1-124 C 80/20 11.46 MW 11.46 MW
944592 AF1-124 E 80/20 26.23 MW 26.23 MW
944601 AF1-125 C 80/20 11.24 MW 11.24 MW
944602 AF1-125 E 80/20 25.73 MW 25.73 MW
944641 AF1-129 C 80/20 31.62 MW 31.62 MW
961602 AG1-000A E 80/20 1.86 MW 1.86 MW
961612 AG1-000B E 80/20 2.42 MW 2.42 MW
316303 AF2-085 80/20 2.11 MW 2.11 MW
943573 AF1-028 BT 80/20 12.01 MW 12.01 MW
958502 AF2-144 E Adder 3.02 MW 2.57 MW

Details for 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 112.77 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 765.38 MVA
MW Contribution: 33.71 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 127.31 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 864.03 MVA
MW Contribution: 39.41 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.1 MW 8.1 MW
315065 1CHESTF6 80/20 3.53 MW 3.53 MW
315083 1SPRUNCA 80/20 1.44 MW 1.44 MW
315084 1SPRUNCB 80/20 1.44 MW 1.44 MW
315605 6W1-029WIND 80/20 0.55 MW 0.55 MW
315611 6Z1-036WIND 80/20 1.0 MW 1.0 MW
901082 W1-029 E 80/20 3.7 MW 3.7 MW
916042 Z1-036 E 80/20 6.68 MW 6.68 MW
916192 Z1-068 E 80/20 0.22 MW 0.22 MW
941032 AE2-094 E 80/20 11.84 MW 11.84 MW
944012 AF1-069 E 80/20 3.87 MW 3.87 MW
961942 AG1-037 E 80/20 0.09 MW 0.09 MW
962332 AG1-082 E 80/20 0.35 MW 0.35 MW
963041 AG1-153 C 80/20 1.73 MW 1.73 MW
963042 AG1-153 E 80/20 2.6 MW 2.6 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.54 MW 1.54 MW
940541 AE2-040 C 80/20 0.88 MW 0.88 MW
941591 AE2-156 C 80/20 5.14 MW 5.14 MW
943571 AF1-028 C Adder -15.77 MW -13.4 MW
944581 AF1-123 C 80/20 10.41 MW 10.41 MW
944582 AF1-123 E 80/20 23.83 MW 23.83 MW
944591 AF1-124 C 80/20 10.44 MW 10.44 MW
944592 AF1-124 E 80/20 23.92 MW 23.92 MW
944601 AF1-125 C 80/20 10.25 MW 10.25 MW
944602 AF1-125 E 80/20 23.46 MW 23.46 MW
944631 AF1-128 C 80/20 21.16 MW 21.16 MW
944641 AF1-129 C 80/20 30.65 MW 30.65 MW
961612 AG1-000B E 80/20 2.31 MW 2.31 MW
316303 AF2-085 80/20 1.84 MW 1.84 MW
943573 AF1-028 BT 80/20 15.77 MW 15.77 MW
958502 AF2-144 E Adder 2.83 MW 2.41 MW

Details for 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 106.15 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 720.45 MVA
MW Contribution: 36.97 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 119.84 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 813.35 MVA
MW Contribution: 40.74 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 80/20 3.64 MW 3.64 MW
315083 1SPRUNCA 80/20 1.51 MW 1.51 MW
315084 1SPRUNCB 80/20 1.51 MW 1.51 MW
315131 1EDGECMA 80/20 2.39 MW 2.39 MW
315605 6W1-029WIND 80/20 0.61 MW 0.61 MW
315611 6Z1-036WIND 80/20 1.11 MW 1.11 MW
901082 W1-029 E 80/20 4.09 MW 4.09 MW
916042 Z1-036 E 80/20 7.45 MW 7.45 MW
916192 Z1-068 E 80/20 0.24 MW 0.24 MW
941032 AE2-094 E 80/20 14.5 MW 14.5 MW
944012 AF1-069 E 80/20 4.74 MW 4.74 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.4 MW 0.4 MW
963041 AG1-153 C 80/20 2.11 MW 2.11 MW
963042 AG1-153 E 80/20 3.16 MW 3.16 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.61 MW 1.61 MW
940541 AE2-040 C 80/20 1.01 MW 1.01 MW
941591 AE2-156 C 80/20 5.61 MW 5.61 MW
943571 AF1-028 C Adder -12.01 MW -10.21 MW
944581 AF1-123 C 80/20 11.41 MW 11.41 MW
944582 AF1-123 E 80/20 26.14 MW 26.14 MW
944591 AF1-124 C 80/20 11.46 MW 11.46 MW
944592 AF1-124 E 80/20 26.23 MW 26.23 MW
944601 AF1-125 C 80/20 11.24 MW 11.24 MW
944602 AF1-125 E 80/20 25.73 MW 25.73 MW
944641 AF1-129 C 80/20 31.62 MW 31.62 MW
961602 AG1-000A E 80/20 1.86 MW 1.86 MW
961612 AG1-000B E 80/20 2.42 MW 2.42 MW
316303 AF2-085 80/20 2.11 MW 2.11 MW
943573 AF1-028 BT 80/20 12.01 MW 12.01 MW
958502 AF2-144 E Adder 3.02 MW 2.57 MW

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 271_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
DVP_P1-2: LN 271_SRT-A
CONTINGENCY 'DVP_P1-2: LN 271_SRT-A'
 OPEN BRANCH FROM BUS 314481 TO BUS 316171 CKT 1   /*6LANDSTN     230.0 - 6POCATY      230.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 111.03 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 753.55 MVA
MW Contribution: 165.62 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315605 6W1-029WIND 80/20 0.61 MW 0.61 MW
315611 6Z1-036WIND 80/20 1.11 MW 1.11 MW
901082 W1-029 E 80/20 4.09 MW 4.09 MW
916042 Z1-036 E 80/20 7.45 MW 7.45 MW
944581 AF1-123 C 80/20 51.14 MW 51.14 MW
944582 AF1-123 E 80/20 117.11 MW 117.11 MW
944591 AF1-124 C 80/20 51.32 MW 51.32 MW
944592 AF1-124 E 80/20 117.53 MW 117.53 MW
944601 AF1-125 C 80/20 50.35 MW 50.35 MW
944602 AF1-125 E 80/20 115.27 MW 115.27 MW
941593 AE2-156 BT 80/20 18.7 MW 18.7 MW
961613 AG1-000B BT 80/20 4.84 MW 4.84 MW

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2240_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
DVP_P1-2: LN 2240_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2240_SRT-A'
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1   /*6FENTRES     230.0 - 6POCATY      230.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 111.03 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 753.53 MVA
MW Contribution: 165.62 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315605 6W1-029WIND 80/20 0.61 MW 0.61 MW
315611 6Z1-036WIND 80/20 1.11 MW 1.11 MW
901082 W1-029 E 80/20 4.09 MW 4.09 MW
916042 Z1-036 E 80/20 7.45 MW 7.45 MW
944581 AF1-123 C 80/20 51.14 MW 51.14 MW
944582 AF1-123 E 80/20 117.11 MW 117.11 MW
944591 AF1-124 C 80/20 51.32 MW 51.32 MW
944592 AF1-124 E 80/20 117.53 MW 117.53 MW
944601 AF1-125 C 80/20 50.35 MW 50.35 MW
944602 AF1-125 E 80/20 115.27 MW 115.27 MW
941593 AE2-156 BT 80/20 18.7 MW 18.7 MW
961613 AG1-000B BT 80/20 4.84 MW 4.84 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Single AC 155.94 % 678.68 B 1058.32 373.01
DVP 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer
314747 to 314744 ckt 1
DVP_P1-2: LN 2193_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2193_SRT-A'
 OPEN BRANCH FROM BUS 313707 TO BUS 313867 CKT 1   /*6FORK UNION  230.0 - 6BREMODIST   230.0
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BUS 313867                                   /*6BREMODIST   230.0
END
Single AC 122.69 % 307.38 B 377.11 17.92
DVP 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Single AC 112.28 % 661.76 B 743.05 34.49
DVP 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 103.93 % 661.76 B 687.77 35.96
DVP 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Single AC 111.02 % 661.76 B 734.68 34.49
DVP 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 102.67 % 661.76 B 679.44 35.96
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Single AC 109.34 % 661.76 B 723.6 34.49
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 101.01 % 661.76 B 668.44 35.96

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 155.94 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 1058.32 MVA
MW Contribution: 373.01 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315605 6W1-029WIND 80/20 2.17 MW 2.17 MW
315611 6Z1-036WIND 80/20 3.75 MW 3.75 MW
901082 W1-029 E 80/20 14.57 MW 14.57 MW
916042 Z1-036 E 80/20 25.17 MW 25.17 MW
916192 Z1-068 E 80/20 0.48 MW 0.48 MW
916191 Z1-068 C 80/20 0.07 MW 0.07 MW
944581 AF1-123 C 80/20 115.18 MW 115.18 MW
944582 AF1-123 E 80/20 263.74 MW 263.74 MW
944591 AF1-124 C 80/20 115.59 MW 115.59 MW
944592 AF1-124 E 80/20 264.7 MW 264.7 MW
944601 AF1-125 C 80/20 113.4 MW 113.4 MW
944602 AF1-125 E 80/20 259.61 MW 259.61 MW

Details for 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 2193_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer
314747 to 314744 ckt 1
Contingency Name:
DVP_P1-2: LN 2193_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2193_SRT-A'
 OPEN BRANCH FROM BUS 313707 TO BUS 313867 CKT 1   /*6FORK UNION  230.0 - 6BREMODIST   230.0
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BUS 313867                                   /*6BREMODIST   230.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 122.69 %
Rating: 307.38 MVA
Rating Type: B
MVA to Mitigate: 377.11 MVA
MW Contribution: 17.92 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944581 AF1-123 C Adder 5.53 MW 4.7 MW
944582 AF1-123 E Adder 12.67 MW 10.77 MW
944591 AF1-124 C Adder 5.55 MW 4.72 MW
944592 AF1-124 E Adder 12.72 MW 10.81 MW
944601 AF1-125 C Adder 5.45 MW 4.63 MW
944602 AF1-125 E Adder 12.47 MW 10.6 MW
944641 AF1-129 C Adder 16.68 MW 14.18 MW
316303 AF2-085 80/20 1.1 MW 1.1 MW
958502 AF2-144 E Adder 1.78 MW 1.51 MW
966253 AG1-494 BT 80/20 3.9 MW 3.9 MW

Details for 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 112.28 %
Rating: 661.76 MVA
Rating Type: B
MVA to Mitigate: 743.05 MVA
MW Contribution: 34.49 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.47 MW 8.47 MW
315065 1CHESTF6 80/20 3.66 MW 3.66 MW
315083 1SPRUNCA 80/20 1.48 MW 1.48 MW
315084 1SPRUNCB 80/20 1.48 MW 1.48 MW
315605 6W1-029WIND 80/20 0.56 MW 0.56 MW
315611 6Z1-036WIND 80/20 1.01 MW 1.01 MW
901082 W1-029 E 80/20 3.78 MW 3.78 MW
916042 Z1-036 E 80/20 6.82 MW 6.82 MW
916192 Z1-068 E 80/20 0.22 MW 0.22 MW
941032 AE2-094 E 80/20 12.0 MW 12.0 MW
944012 AF1-069 E 80/20 3.92 MW 3.92 MW
961942 AG1-037 E 80/20 0.09 MW 0.09 MW
962332 AG1-082 E 80/20 0.36 MW 0.36 MW
963041 AG1-153 C 80/20 1.77 MW 1.77 MW
963042 AG1-153 E 80/20 2.66 MW 2.66 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.59 MW 1.59 MW
940541 AE2-040 C 80/20 0.89 MW 0.89 MW
941591 AE2-156 C 80/20 5.26 MW 5.26 MW
943571 AF1-028 C Adder -15.56 MW -13.23 MW
944581 AF1-123 C 80/20 10.65 MW 10.65 MW
944582 AF1-123 E 80/20 24.38 MW 24.38 MW
944591 AF1-124 C 80/20 10.69 MW 10.69 MW
944592 AF1-124 E 80/20 24.47 MW 24.47 MW
944601 AF1-125 C 80/20 10.48 MW 10.48 MW
944602 AF1-125 E 80/20 24.0 MW 24.0 MW
944631 AF1-128 C 80/20 22.12 MW 22.12 MW
944641 AF1-129 C 80/20 31.81 MW 31.81 MW
961612 AG1-000B E 80/20 2.39 MW 2.39 MW
316303 AF2-085 80/20 1.82 MW 1.82 MW
943573 AF1-028 BT 80/20 15.56 MW 15.56 MW
958502 AF2-144 E Adder 2.7 MW 2.3 MW

Details for 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 103.93 %
Rating: 661.76 MVA
Rating Type: B
MVA to Mitigate: 687.77 MVA
MW Contribution: 35.96 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 80/20 3.59 MW 3.59 MW
315083 1SPRUNCA 80/20 1.48 MW 1.48 MW
315084 1SPRUNCB 80/20 1.48 MW 1.48 MW
315131 1EDGECMA 80/20 2.43 MW 2.43 MW
315605 6W1-029WIND 80/20 0.6 MW 0.6 MW
315611 6Z1-036WIND 80/20 1.09 MW 1.09 MW
901082 W1-029 E 80/20 3.99 MW 3.99 MW
916042 Z1-036 E 80/20 7.29 MW 7.29 MW
916192 Z1-068 E 80/20 0.23 MW 0.23 MW
941032 AE2-094 E 80/20 14.17 MW 14.17 MW
944012 AF1-069 E 80/20 4.63 MW 4.63 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.4 MW 0.4 MW
963041 AG1-153 C 80/20 2.08 MW 2.08 MW
963042 AG1-153 E 80/20 3.13 MW 3.13 MW
966251 AG1-494 C 80/20 1.17 MW 1.17 MW
966252 AG1-494 E 80/20 1.76 MW 1.76 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.58 MW 1.58 MW
940541 AE2-040 C 80/20 0.99 MW 0.99 MW
941591 AE2-156 C 80/20 5.46 MW 5.46 MW
943571 AF1-028 C Adder -11.75 MW -9.99 MW
944581 AF1-123 C 80/20 11.1 MW 11.1 MW
944582 AF1-123 E 80/20 25.43 MW 25.43 MW
944591 AF1-124 C 80/20 11.14 MW 11.14 MW
944592 AF1-124 E 80/20 25.52 MW 25.52 MW
944601 AF1-125 C 80/20 10.93 MW 10.93 MW
944602 AF1-125 E 80/20 25.03 MW 25.03 MW
944641 AF1-129 C 80/20 31.17 MW 31.17 MW
961602 AG1-000A E 80/20 1.89 MW 1.89 MW
961612 AG1-000B E 80/20 2.37 MW 2.37 MW
316303 AF2-085 80/20 2.03 MW 2.03 MW
943573 AF1-028 BT 80/20 11.75 MW 11.75 MW
958502 AF2-144 E Adder 2.86 MW 2.43 MW

Details for 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 111.02 %
Rating: 661.76 MVA
Rating Type: B
MVA to Mitigate: 734.68 MVA
MW Contribution: 34.49 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.47 MW 8.47 MW
315065 1CHESTF6 80/20 3.66 MW 3.66 MW
315083 1SPRUNCA 80/20 1.48 MW 1.48 MW
315084 1SPRUNCB 80/20 1.48 MW 1.48 MW
315605 6W1-029WIND 80/20 0.56 MW 0.56 MW
315611 6Z1-036WIND 80/20 1.01 MW 1.01 MW
901082 W1-029 E 80/20 3.78 MW 3.78 MW
916042 Z1-036 E 80/20 6.82 MW 6.82 MW
916192 Z1-068 E 80/20 0.22 MW 0.22 MW
941032 AE2-094 E 80/20 12.0 MW 12.0 MW
944012 AF1-069 E 80/20 3.92 MW 3.92 MW
961942 AG1-037 E 80/20 0.09 MW 0.09 MW
962332 AG1-082 E 80/20 0.36 MW 0.36 MW
963041 AG1-153 C 80/20 1.77 MW 1.77 MW
963042 AG1-153 E 80/20 2.66 MW 2.66 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.59 MW 1.59 MW
940541 AE2-040 C 80/20 0.89 MW 0.89 MW
941591 AE2-156 C 80/20 5.26 MW 5.26 MW
943571 AF1-028 C Adder -15.56 MW -13.23 MW
944581 AF1-123 C 80/20 10.65 MW 10.65 MW
944582 AF1-123 E 80/20 24.38 MW 24.38 MW
944591 AF1-124 C 80/20 10.69 MW 10.69 MW
944592 AF1-124 E 80/20 24.47 MW 24.47 MW
944601 AF1-125 C 80/20 10.48 MW 10.48 MW
944602 AF1-125 E 80/20 24.0 MW 24.0 MW
944631 AF1-128 C 80/20 22.12 MW 22.12 MW
944641 AF1-129 C 80/20 31.81 MW 31.81 MW
961612 AG1-000B E 80/20 2.39 MW 2.39 MW
316303 AF2-085 80/20 1.82 MW 1.82 MW
943573 AF1-028 BT 80/20 15.56 MW 15.56 MW
958502 AF2-144 E Adder 2.7 MW 2.3 MW

Details for 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 102.67 %
Rating: 661.76 MVA
Rating Type: B
MVA to Mitigate: 679.44 MVA
MW Contribution: 35.96 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 80/20 3.59 MW 3.59 MW
315083 1SPRUNCA 80/20 1.48 MW 1.48 MW
315084 1SPRUNCB 80/20 1.48 MW 1.48 MW
315131 1EDGECMA 80/20 2.43 MW 2.43 MW
315605 6W1-029WIND 80/20 0.6 MW 0.6 MW
315611 6Z1-036WIND 80/20 1.09 MW 1.09 MW
901082 W1-029 E 80/20 3.99 MW 3.99 MW
916042 Z1-036 E 80/20 7.29 MW 7.29 MW
916192 Z1-068 E 80/20 0.23 MW 0.23 MW
941032 AE2-094 E 80/20 14.17 MW 14.17 MW
944012 AF1-069 E 80/20 4.63 MW 4.63 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.4 MW 0.4 MW
963041 AG1-153 C 80/20 2.08 MW 2.08 MW
963042 AG1-153 E 80/20 3.13 MW 3.13 MW
966251 AG1-494 C 80/20 1.17 MW 1.17 MW
966252 AG1-494 E 80/20 1.76 MW 1.76 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.58 MW 1.58 MW
940541 AE2-040 C 80/20 0.99 MW 0.99 MW
941591 AE2-156 C 80/20 5.46 MW 5.46 MW
943571 AF1-028 C Adder -11.75 MW -9.99 MW
944581 AF1-123 C 80/20 11.1 MW 11.1 MW
944582 AF1-123 E 80/20 25.43 MW 25.43 MW
944591 AF1-124 C 80/20 11.14 MW 11.14 MW
944592 AF1-124 E 80/20 25.52 MW 25.52 MW
944601 AF1-125 C 80/20 10.93 MW 10.93 MW
944602 AF1-125 E 80/20 25.03 MW 25.03 MW
944641 AF1-129 C 80/20 31.17 MW 31.17 MW
961602 AG1-000A E 80/20 1.89 MW 1.89 MW
961612 AG1-000B E 80/20 2.37 MW 2.37 MW
316303 AF2-085 80/20 2.03 MW 2.03 MW
943573 AF1-028 BT 80/20 11.75 MW 11.75 MW
958502 AF2-144 E Adder 2.86 MW 2.43 MW

Details for 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 109.34 %
Rating: 661.76 MVA
Rating Type: B
MVA to Mitigate: 723.6 MVA
MW Contribution: 34.49 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 80/20 8.47 MW 8.47 MW
315065 1CHESTF6 80/20 3.66 MW 3.66 MW
315083 1SPRUNCA 80/20 1.48 MW 1.48 MW
315084 1SPRUNCB 80/20 1.48 MW 1.48 MW
315605 6W1-029WIND 80/20 0.56 MW 0.56 MW
315611 6Z1-036WIND 80/20 1.01 MW 1.01 MW
901082 W1-029 E 80/20 3.78 MW 3.78 MW
916042 Z1-036 E 80/20 6.82 MW 6.82 MW
916192 Z1-068 E 80/20 0.22 MW 0.22 MW
941032 AE2-094 E 80/20 12.0 MW 12.0 MW
944012 AF1-069 E 80/20 3.92 MW 3.92 MW
961942 AG1-037 E 80/20 0.09 MW 0.09 MW
962332 AG1-082 E 80/20 0.36 MW 0.36 MW
963041 AG1-153 C 80/20 1.77 MW 1.77 MW
963042 AG1-153 E 80/20 2.66 MW 2.66 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.59 MW 1.59 MW
940541 AE2-040 C 80/20 0.89 MW 0.89 MW
941591 AE2-156 C 80/20 5.26 MW 5.26 MW
943571 AF1-028 C Adder -15.56 MW -13.23 MW
944581 AF1-123 C 80/20 10.65 MW 10.65 MW
944582 AF1-123 E 80/20 24.38 MW 24.38 MW
944591 AF1-124 C 80/20 10.69 MW 10.69 MW
944592 AF1-124 E 80/20 24.47 MW 24.47 MW
944601 AF1-125 C 80/20 10.48 MW 10.48 MW
944602 AF1-125 E 80/20 24.0 MW 24.0 MW
944631 AF1-128 C 80/20 22.12 MW 22.12 MW
944641 AF1-129 C 80/20 31.81 MW 31.81 MW
961612 AG1-000B E 80/20 2.39 MW 2.39 MW
316303 AF2-085 80/20 1.82 MW 1.82 MW
943573 AF1-028 BT 80/20 15.56 MW 15.56 MW
958502 AF2-144 E Adder 2.7 MW 2.3 MW

Details for 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 576_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
Contingency Name:
DVP_P1-2: LN 576_SRT-A
CONTINGENCY 'DVP_P1-2: LN 576_SRT-A'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 101.01 %
Rating: 661.76 MVA
Rating Type: B
MVA to Mitigate: 668.44 MVA
MW Contribution: 35.96 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315065 1CHESTF6 80/20 3.59 MW 3.59 MW
315083 1SPRUNCA 80/20 1.48 MW 1.48 MW
315084 1SPRUNCB 80/20 1.48 MW 1.48 MW
315131 1EDGECMA 80/20 2.43 MW 2.43 MW
315605 6W1-029WIND 80/20 0.6 MW 0.6 MW
315611 6Z1-036WIND 80/20 1.09 MW 1.09 MW
901082 W1-029 E 80/20 3.99 MW 3.99 MW
916042 Z1-036 E 80/20 7.29 MW 7.29 MW
916192 Z1-068 E 80/20 0.23 MW 0.23 MW
941032 AE2-094 E 80/20 14.17 MW 14.17 MW
944012 AF1-069 E 80/20 4.63 MW 4.63 MW
961942 AG1-037 E 80/20 0.1 MW 0.1 MW
962332 AG1-082 E 80/20 0.4 MW 0.4 MW
963041 AG1-153 C 80/20 2.08 MW 2.08 MW
963042 AG1-153 E 80/20 3.13 MW 3.13 MW
966251 AG1-494 C 80/20 1.17 MW 1.17 MW
966252 AG1-494 E 80/20 1.76 MW 1.76 MW
916191 Z1-068 C 80/20 0.03 MW 0.03 MW
961611 AG1-000B C 80/20 1.58 MW 1.58 MW
940541 AE2-040 C 80/20 0.99 MW 0.99 MW
941591 AE2-156 C 80/20 5.46 MW 5.46 MW
943571 AF1-028 C Adder -11.75 MW -9.99 MW
944581 AF1-123 C 80/20 11.1 MW 11.1 MW
944582 AF1-123 E 80/20 25.43 MW 25.43 MW
944591 AF1-124 C 80/20 11.14 MW 11.14 MW
944592 AF1-124 E 80/20 25.52 MW 25.52 MW
944601 AF1-125 C 80/20 10.93 MW 10.93 MW
944602 AF1-125 E 80/20 25.03 MW 25.03 MW
944641 AF1-129 C 80/20 31.17 MW 31.17 MW
961602 AG1-000A E 80/20 1.89 MW 1.89 MW
961612 AG1-000B E 80/20 2.37 MW 2.37 MW
316303 AF2-085 80/20 2.03 MW 2.03 MW
943573 AF1-028 BT 80/20 11.75 MW 11.75 MW
958502 AF2-144 E Adder 2.86 MW 2.43 MW

Light Load Potential Congestion due to Local Energy Deliverability

The following flowgates remain after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
OP AC 108.13 % 678.68 B 733.88 33.71
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
OP AC 107.69 % 678.68 B 730.88 33.71
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 2240_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2240_SRT-A'
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1   /*6FENTRES     230.0 - 6POCATY      230.0
END
OP AC 109.49 % 678.68 B 743.08 165.62

Details for 6BREMO-6BREMODIST 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 108.13 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 733.88 MVA
MW Contribution: 33.71 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 120.88 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 820.42 MVA
MW Contribution: 39.41 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 Adder 8.1 MW 6.88 MW
315065 1CHESTF6 Adder 3.53 MW 3.0 MW
315083 1SPRUNCA Adder 1.44 MW 1.23 MW
315084 1SPRUNCB Adder 1.44 MW 1.23 MW
315611 6Z1-036WIND Adder 1.0 MW 0.85 MW
916042 Z1-036 E Adder 6.68 MW 5.68 MW
941032 AE2-094 E Adder 11.84 MW 10.06 MW
944012 AF1-069 E Adder 3.87 MW 3.29 MW
961942 AG1-037 E Adder 0.09 MW 0.07 MW
962332 AG1-082 E Adder 0.36 MW 0.3 MW
963041 AG1-153 C Adder 1.73 MW 1.47 MW
963042 AG1-153 E Adder 2.6 MW 2.21 MW
961611 AG1-000B C Adder 1.54 MW 1.31 MW
940541 AE2-040 C Adder 0.88 MW 0.74 MW
941591 AE2-156 C Adder 5.14 MW 4.37 MW
943571 AF1-028 C Adder -15.77 MW -13.4 MW
944581 AF1-123 C Adder 10.41 MW 8.85 MW
944582 AF1-123 E Adder 23.83 MW 20.26 MW
944591 AF1-124 C Adder 10.44 MW 8.88 MW
944592 AF1-124 E Adder 23.92 MW 20.33 MW
944601 AF1-125 C Adder 10.25 MW 8.71 MW
944602 AF1-125 E Adder 23.46 MW 19.94 MW
944631 AF1-128 C Adder 21.16 MW 17.98 MW
944641 AF1-129 C Adder 30.65 MW 26.05 MW
961612 AG1-000B E Adder 2.31 MW 1.97 MW
316303 AF2-085 Adder 2.16 MW 1.84 MW
958502 AF2-144 E Adder 2.83 MW 2.41 MW

Details for 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 107.69 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 730.88 MVA
MW Contribution: 33.71 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: DVP
Facility Description:
6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 120.43 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 817.34 MVA
MW Contribution: 39.41 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 Adder 8.1 MW 6.88 MW
315065 1CHESTF6 Adder 3.53 MW 3.0 MW
315083 1SPRUNCA Adder 1.44 MW 1.23 MW
315084 1SPRUNCB Adder 1.44 MW 1.23 MW
315611 6Z1-036WIND Adder 1.0 MW 0.85 MW
916042 Z1-036 E Adder 6.68 MW 5.68 MW
941032 AE2-094 E Adder 11.84 MW 10.06 MW
944012 AF1-069 E Adder 3.87 MW 3.29 MW
961942 AG1-037 E Adder 0.09 MW 0.07 MW
962332 AG1-082 E Adder 0.36 MW 0.3 MW
963041 AG1-153 C Adder 1.73 MW 1.47 MW
963042 AG1-153 E Adder 2.6 MW 2.21 MW
961611 AG1-000B C Adder 1.54 MW 1.31 MW
940541 AE2-040 C Adder 0.88 MW 0.74 MW
941591 AE2-156 C Adder 5.14 MW 4.37 MW
943571 AF1-028 C Adder -15.77 MW -13.4 MW
944581 AF1-123 C Adder 10.41 MW 8.85 MW
944582 AF1-123 E Adder 23.83 MW 20.26 MW
944591 AF1-124 C Adder 10.44 MW 8.88 MW
944592 AF1-124 E Adder 23.92 MW 20.33 MW
944601 AF1-125 C Adder 10.25 MW 8.71 MW
944602 AF1-125 E Adder 23.46 MW 19.94 MW
944631 AF1-128 C Adder 21.16 MW 17.98 MW
944641 AF1-129 C Adder 30.65 MW 26.05 MW
961612 AG1-000B E Adder 2.31 MW 1.97 MW
316303 AF2-085 Adder 2.16 MW 1.84 MW
958502 AF2-144 E Adder 2.83 MW 2.41 MW

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 2240_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
DVP_P1-2: LN 2240_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2240_SRT-A'
 OPEN BRANCH FROM BUS 314466 TO BUS 316171 CKT 1   /*6FENTRES     230.0 - 6POCATY      230.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 109.49 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 743.08 MVA
MW Contribution: 165.62 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315611 6Z1-036WIND Adder 1.11 MW 0.94 MW
916042 Z1-036 E Adder 7.44 MW 6.33 MW
944581 AF1-123 C 50/50 51.14 MW 51.14 MW
944582 AF1-123 E 50/50 117.11 MW 117.11 MW
944591 AF1-124 C 50/50 51.32 MW 51.32 MW
944592 AF1-124 E 50/50 117.53 MW 117.53 MW
944601 AF1-125 C 50/50 50.35 MW 50.35 MW
944602 AF1-125 E 50/50 115.27 MW 115.27 MW
941593 AE2-156 BT 50/50 18.7 MW 18.7 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
OP AC 155.94 % 678.68 B 1058.32 373.01
DVP 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer
314747 to 314744 ckt 1
DVP_P1-2: LN 2193_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2193_SRT-A'
 OPEN BRANCH FROM BUS 313707 TO BUS 313867 CKT 1   /*6FORK UNION  230.0 - 6BREMODIST   230.0
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BUS 313867                                   /*6BREMODIST   230.0
END
OP AC 121.49 % 307.38 B 373.43 17.92
DVP 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
OP AC 106.02 % 661.76 B 701.57 34.49
DVP 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
OP AC 104.73 % 661.76 B 693.07 34.49
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
OP AC 103.08 % 661.76 B 682.17 34.49

Details for 6FENTRES-6THRASHER 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 588_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FENTRES-6THRASHER 230.0 kV Ckt 1 line
314466 to 314508 ckt 1
Contingency Name:
DVP_P1-2: LN 588_SRT-A
CONTINGENCY 'DVP_P1-2: LN 588_SRT-A'
 OPEN BRANCH FROM BUS 314909 TO BUS 314927 CKT 1   /*8FENTRES     500.0 - 8YADKIN      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 155.94 %
Rating: 678.68 MVA
Rating Type: B
MVA to Mitigate: 1058.32 MVA
MW Contribution: 373.01 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315605 6W1-029WIND 50/50 2.17 MW 2.17 MW
315611 6Z1-036WIND 50/50 3.75 MW 3.75 MW
901082 W1-029 E 50/50 14.57 MW 14.57 MW
916042 Z1-036 E 50/50 25.17 MW 25.17 MW
916192 Z1-068 E 50/50 0.48 MW 0.48 MW
916191 Z1-068 C 50/50 0.07 MW 0.07 MW
944581 AF1-123 C 50/50 115.18 MW 115.18 MW
944582 AF1-123 E 50/50 263.74 MW 263.74 MW
944591 AF1-124 C 50/50 115.59 MW 115.59 MW
944592 AF1-124 E 50/50 264.7 MW 264.7 MW
944601 AF1-125 C 50/50 113.4 MW 113.4 MW
944602 AF1-125 E 50/50 259.61 MW 259.61 MW

Details for 6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer l/o DVP_P1-2: LN 2193_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6BREMO-3BREMO 230.0/115.0 kV Ckt 1 transformer
314747 to 314744 ckt 1
Contingency Name:
DVP_P1-2: LN 2193_SRT-A
CONTINGENCY 'DVP_P1-2: LN 2193_SRT-A'
 OPEN BRANCH FROM BUS 313707 TO BUS 313867 CKT 1   /*6FORK UNION  230.0 - 6BREMODIST   230.0
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BUS 313867                                   /*6BREMODIST   230.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 121.49 %
Rating: 307.38 MVA
Rating Type: B
MVA to Mitigate: 373.43 MVA
MW Contribution: 17.92 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
944581 AF1-123 C Adder 5.53 MW 4.7 MW
944582 AF1-123 E Adder 12.67 MW 10.77 MW
944591 AF1-124 C Adder 5.55 MW 4.72 MW
944592 AF1-124 E Adder 12.72 MW 10.81 MW
944601 AF1-125 C Adder 5.45 MW 4.63 MW
944602 AF1-125 E Adder 12.47 MW 10.6 MW
944641 AF1-129 C Adder 16.68 MW 14.18 MW
316303 AF2-085 Adder 1.3 MW 1.1 MW
958502 AF2-144 E Adder 1.78 MW 1.51 MW

Details for 6FORK UNION-6CUNNING 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6FORK UNION-6CUNNING 230.0 kV Ckt 1 line
313707 to 313373 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 106.02 %
Rating: 661.76 MVA
Rating Type: B
MVA to Mitigate: 701.57 MVA
MW Contribution: 34.49 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 Adder 8.47 MW 7.2 MW
315065 1CHESTF6 Adder 3.66 MW 3.11 MW
315083 1SPRUNCA Adder 1.48 MW 1.26 MW
315084 1SPRUNCB Adder 1.48 MW 1.26 MW
315611 6Z1-036WIND Adder 1.02 MW 0.86 MW
916042 Z1-036 E Adder 6.82 MW 5.79 MW
941032 AE2-094 E Adder 12.0 MW 10.2 MW
944012 AF1-069 E Adder 3.92 MW 3.33 MW
961942 AG1-037 E Adder 0.09 MW 0.07 MW
962332 AG1-082 E Adder 0.36 MW 0.31 MW
963041 AG1-153 C Adder 1.77 MW 1.5 MW
963042 AG1-153 E Adder 2.66 MW 2.26 MW
961611 AG1-000B C Adder 1.59 MW 1.35 MW
940541 AE2-040 C Adder 0.89 MW 0.76 MW
941591 AE2-156 C Adder 5.26 MW 4.47 MW
943571 AF1-028 C Adder -15.56 MW -13.23 MW
944581 AF1-123 C Adder 10.65 MW 9.05 MW
944582 AF1-123 E Adder 24.38 MW 20.73 MW
944591 AF1-124 C Adder 10.69 MW 9.08 MW
944592 AF1-124 E Adder 24.47 MW 20.8 MW
944601 AF1-125 C Adder 10.48 MW 8.91 MW
944602 AF1-125 E Adder 24.0 MW 20.4 MW
944631 AF1-128 C Adder 22.12 MW 18.8 MW
944641 AF1-129 C Adder 31.81 MW 27.04 MW
961612 AG1-000B E Adder 2.39 MW 2.03 MW
316303 AF2-085 Adder 2.15 MW 1.82 MW
958502 AF2-144 E Adder 2.7 MW 2.3 MW

Details for 6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line
313373 to 314765 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 104.73 %
Rating: 661.76 MVA
Rating Type: B
MVA to Mitigate: 693.07 MVA
MW Contribution: 34.49 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 Adder 8.47 MW 7.2 MW
315065 1CHESTF6 Adder 3.66 MW 3.11 MW
315083 1SPRUNCA Adder 1.48 MW 1.26 MW
315084 1SPRUNCB Adder 1.48 MW 1.26 MW
315611 6Z1-036WIND Adder 1.02 MW 0.86 MW
916042 Z1-036 E Adder 6.82 MW 5.79 MW
941032 AE2-094 E Adder 12.0 MW 10.2 MW
944012 AF1-069 E Adder 3.92 MW 3.33 MW
961942 AG1-037 E Adder 0.09 MW 0.07 MW
962332 AG1-082 E Adder 0.36 MW 0.31 MW
963041 AG1-153 C Adder 1.77 MW 1.5 MW
963042 AG1-153 E Adder 2.66 MW 2.26 MW
961611 AG1-000B C Adder 1.59 MW 1.35 MW
940541 AE2-040 C Adder 0.89 MW 0.76 MW
941591 AE2-156 C Adder 5.26 MW 4.47 MW
943571 AF1-028 C Adder -15.56 MW -13.23 MW
944581 AF1-123 C Adder 10.65 MW 9.05 MW
944582 AF1-123 E Adder 24.38 MW 20.73 MW
944591 AF1-124 C Adder 10.69 MW 9.08 MW
944592 AF1-124 E Adder 24.47 MW 20.8 MW
944601 AF1-125 C Adder 10.48 MW 8.91 MW
944602 AF1-125 E Adder 24.0 MW 20.4 MW
944631 AF1-128 C Adder 22.12 MW 18.8 MW
944641 AF1-129 C Adder 31.81 MW 27.04 MW
961612 AG1-000B E Adder 2.39 MW 2.03 MW
316303 AF2-085 Adder 2.15 MW 1.82 MW
958502 AF2-144 E Adder 2.7 MW 2.3 MW

Details for 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line l/o DVP_P1-2: LN 534_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: DVP
Facility Description:
6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
Contingency Name:
DVP_P1-2: LN 534_SRT-L
CONTINGENCY 'DVP_P1-2: LN 534_SRT-L'
 OPEN BRANCH FROM BUS 314907 TO BUS 314910 CKT 1                /*8DOOMS       500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET POSTCONTRATING 1663 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET POSTCONTRATING 4399 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314942 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAEAS 500.0
 SET PRECONTRATING 1481 BRANCH FROM BUS 314910 TO BUS 314943 CKT 1 /*8CUNINGHAM   500.0 - 8FLUVANNAWES 500.0
 SET PRECONTRATING 4157 BRANCH FROM BUS 314907 TO BUS 314926 CKT 1 /*8DOOMS       500.0 - 8VALLEY      500.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 103.08 %
Rating: 661.76 MVA
Rating Type: B
MVA to Mitigate: 682.17 MVA
MW Contribution: 34.49 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
315060 1CHESTF5 Adder 8.47 MW 7.2 MW
315065 1CHESTF6 Adder 3.66 MW 3.11 MW
315083 1SPRUNCA Adder 1.48 MW 1.26 MW
315084 1SPRUNCB Adder 1.48 MW 1.26 MW
315611 6Z1-036WIND Adder 1.02 MW 0.86 MW
916042 Z1-036 E Adder 6.82 MW 5.79 MW
941032 AE2-094 E Adder 12.0 MW 10.2 MW
944012 AF1-069 E Adder 3.92 MW 3.33 MW
961942 AG1-037 E Adder 0.09 MW 0.07 MW
962332 AG1-082 E Adder 0.36 MW 0.31 MW
963041 AG1-153 C Adder 1.77 MW 1.5 MW
963042 AG1-153 E Adder 2.66 MW 2.26 MW
961611 AG1-000B C Adder 1.59 MW 1.35 MW
940541 AE2-040 C Adder 0.89 MW 0.76 MW
941591 AE2-156 C Adder 5.26 MW 4.47 MW
943571 AF1-028 C Adder -15.56 MW -13.23 MW
944581 AF1-123 C Adder 10.65 MW 9.05 MW
944582 AF1-123 E Adder 24.38 MW 20.73 MW
944591 AF1-124 C Adder 10.69 MW 9.08 MW
944592 AF1-124 E Adder 24.47 MW 20.8 MW
944601 AF1-125 C Adder 10.48 MW 8.91 MW
944602 AF1-125 E Adder 24.0 MW 20.4 MW
944631 AF1-128 C Adder 22.12 MW 18.8 MW
944641 AF1-129 C Adder 31.81 MW 27.04 MW
961612 AG1-000B E Adder 2.39 MW 2.03 MW
316303 AF2-085 Adder 2.15 MW 1.82 MW
958502 AF2-144 E Adder 2.7 MW 2.3 MW

Short Circuit Analysis

The Phase III Short circuit analysis was conducted for the following two study scenarios:

 

  • Scenario 1 - TC1 Project Impacts;
  • Scenario 2 - TC1 Topology-Changing Upgrade Impacts;

 

The starting TC1 Phase III short circuit case is an updated Phase II case that accounted for the DPII outcomes (project changes & withdrawals) and other pre-TC1 changes. The starting Phase III case was utilized for the Scenario 1 studies to determine the impact of TC1 projects without modeling any topology-changing upgrades required for TC1. To conduct the Scenario 2 studies, the required topology-changing upgrades from the latest Load Flow & Stability studies were incorporated into the Scenario 1 case and utilized for the Scenario 2 studies to determine the impact of the topology-changing upgrades on the short circuit results from Scenario 1. The result is detailed in the following table:

 

 Short Circuit Analysis

 

 

 

 

 

 

 

Bus Name

Breaker

Interrupting Capability (Amps)

Duty Percent TC1 Phase 3 - Scenario 2 Topology Upgrades (%)

Duty Percent TC1 Phase 3 - Scenario 2 No Topology Upgrades (%)

Duty Percent Difference (%)

Reinforcement

Projected In Service Date (ISD)

BRAMBLETON 230.kV

20102

63000

103.66%

95.89%

7.76%

b3800.405

1/8/2031

BRAMBLETON 230.kV

20602

63000

105.40%

97.28%

8.12%

b3800.405

1/8/2031

BRAMBLETON 230.kV

204502

63000

105.03%

97.32%

7.72%

b3800.405

1/8/2031

BRAMBLETON 230.kV

209402

63000

105.07%

97.35%

7.72%

b3800.405

1/8/2031

BRAMBLETON 230.kV

217202

63000

103.17%

95.89%

7.28%

b4000.103

1/8/2031

BRAMBLETON 230.kV

218302

63000

109.45%

101.02%

8.43%

b3689.2

3/31/2027

BRAMBLETON 230.kV

201T2045

63000

105.03%

97.32%

7.72%

b3800.405

1/8/2031

BRAMBLETON 230.kV

206T2094

63000

105.40%

97.35%

8.05%

b3800.405

1/8/2031

BRAMBLETON 230.kV

2172T2183

63000

107.20%

99.03%

8.17%

b4000.103

1/8/2031

BRAMBLETON 230.kV

H302

63000

109.45%

101.02%

8.43%

b3689.2

3/31/2027

BRAMBLETON 230.kV

H402

63000

109.45%

101.02%

8.43%

b3689.2

3/31/2027

BRAMBLETON 230.kV

L102

63000

103.17%

95.89%

7.28%

b4000.103

6/1/2028

BRAMBLETON 230.kV

SC102

63000

109.45%

101.02%

8.43%

b3689.2

3/31/2027

CARSON 230.kV

23872

40000

100.25%

98.16%

2.09%

b4000.108

6/12/2029

CARSON 230.kV

200272

40000

100.40%

98.51%

1.88%

b3854.1

6/1/2025

GAINESVILLE 230.kV

216192

40000

126.89%

104.16%

22.73%

b3800.406

3/15/2030

IDYLWOOD 230.kV

20212

40000

103.71%

100.35%

3.35%

b1696

12/30/2026

IDYLWOOD 230.kV

20712

40000

101.95%

98.56%

3.39%

b1696

12/30/2026

LADYSMITH 500.kV

568T575

40000

103.90%

88.38%

15.52%

b4000.354

11/14/2029

LADYSMITH 500.kV

574T581

40000

112.03%

87.44%

24.59%

b4000.115

11/27/2031

LADYSMITH S1 230.kV

GT172

40000

101.24%

94.15%

7.09%

b4000.114

7/18/2030

LADYSMITH S1 230.kV

GT272

40000

101.24%

94.15%

7.09%

b4000.114

7/18/2030

LADYSMITH S1 230.kV

GT372

40000

101.04%

93.94%

7.10%

b4000.114

7/18/2030

LADYSMITH S1 230.kV

GT472

40000

101.04%

93.94%

7.10%

b4000.114

7/18/2030

LADYSMITH S1 230.kV

GT572

40000

101.03%

93.93%

7.10%

b4000.114

7/18/2030

LADYSMITH S1 230.kV

SX1272

40000

105.46%

98.43%

7.04%

b3853.1

6/1/2025

LADYSMITH S1 230.kV

SX3472

40000

105.46%

98.43%

7.04%

b3853.1

6/1/2025

LOUDOUN 230.kV

200852

63000

103.92%

95.27%

8.65%

b3800.334

10/5/2031

LOUDOUN 230.kV

203052

63000

102.57%

95.02%

7.56%

b3800.334

10/5/2031

LOUDOUN 230.kV

204552

63000

101.56%

93.15%

8.41%

b3800.407

10/5/2031

LOUDOUN 230.kV

211752

63000

107.05%

98.13%

8.92%

b3800.235

10/5/2031

LOUDOUN 230.kV

212352

63000

107.59%

98.67%

8.92%

b3800.235

10/5/2031

LOUDOUN 230.kV

214052

63000

104.61%

96.50%

8.11%

b3800.334

10/5/2031

LOUDOUN 230.kV

217352

63000

101.82%

93.34%

8.47%

b3800.407

10/5/2031

LOUDOUN 230.kV

2008T2045

63000

103.92%

95.27%

8.65%

b3800.235

10/5/2031

LOUDOUN 230.kV

2030T2117

63000

107.05%

98.13%

8.92%

b3800.235

10/5/2031

LOUDOUN 230.kV

2094T2140

63000

104.61%

96.50%

8.11%

b3800.334

10/5/2031

LOUDOUN 230.kV

2123T2173

63000

107.59%

98.67%

8.92%

b3800.235

10/5/2031

LOUDOUN CAP 230.kV

SC352

50000

100.12%

93.62%

6.50%

b4000.119

10/31/2030

NORTH ANNA 500.kV

57502

40000

113.86%

95.53%

18.33%

b4000.128

10/13/2032

NORTH ANNA 500.kV

G102-1

40000

113.86%

95.53%

18.33%

b4000.128

10/13/2032

NORTH ANNA 500.kV

G102-2

40000

113.48%

95.12%

18.36%

b4000.128

10/13/2032

NORTH ANNA 500.kV

G202

40000

113.86%

95.53%

18.33%

b4000.128

10/13/2032

NORTH ANNA 500.kV

G2T575

40000

106.24%

87.81%

18.44%

b4000.128

10/13/2032

NORTH ANNA 500.kV

XT573

40000

113.86%

95.53%

18.33%

b4000.128

10/13/2032

OX 230.kV

22042

63000

100.37%

96.12%

4.24%

b3800.408

4/21/1931

OX 230.kV

220T2063

63000

100.37%

96.12%

4.24%

b3800.408

4/21/1931

OX 500.kV

56142

40000

105.23%

98.27%

6.96%

b3800.335

12/15/1931

OX 500.kV

H1T539

40000

104.44%

97.54%

6.90%

b3800.236

1/5/2029

OX 500.kV

H2T539

40000

104.44%

97.54%

6.90%

b3800.236

1/5/2029

OX L142 230.kV

L142

50000

108.05%

103.82%

4.22%

s2609.6

12/15/2030

PLEASANTVIEW 230.kV

L3T203

50000

108.44%

103.89%

4.56%

s2609.9

12/15/2030

PLEASANTVIEW 230.kV

L3T2180

50000

108.44%

103.89%

4.56%

s2609.9

12/15/2030

REMINGTON CT 230.kV

211462

40000

102.56%

95.98%

6.58%

b4000.134

1/9/2031

REMINGTON S1 230.kV

GT162

40000

101.45%

95.39%

6.06%

b4000.134

1/9/2031

REMINGTON S1 230.kV

GT262

40000

101.45%

95.39%

6.06%

b4000.134

1/9/2031

REMINGTON S2 230.kV

GT362

40000

101.45%

95.39%

6.06%

b4000.134

1/9/2031

REMINGTON S2 230.kV

GT462

40000

101.45%

95.39%

6.06%

b4000.134

1/9/2031

YADKIN 2&4 230.kV

210512

40000

101.22%

99.46%

1.76%

n6588

12/1/2028

 

 

Stability Analysis

Analysis Complete - Issues Found

Executive Summary for Dynamic Stability Analysis using PSSE

New Service Requests (projects) in PJM Transition Cycle 1 Cluster 29 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 29 projects.

 

Table 1: Transition Cycle 1 Cluster 29 Projects

 

 

 

 

 

 

 

Cluster

Project

Fuel Type

Transmission Owner

MFO (MW)

MWE (MW)

MWC (MW)

Point of Interconnection

29

AF1-123

Wind

Dominion

833

833

253.2

Harper 230 kV

AF1-124

Wind

Dominion

836

836

254.1

Harper 230 kV

AF1-125

Wind

Dominion

820

820

249.3

Harper 230 kV

 

This analysis is effectively a screening study to determine whether the addition of the Cluster 29 projects will meet the dynamics requirements of the NERC, Dominion Energy, and PJM reliability standards.

 

The load flow case finalized for Phase 2 was used as a starting point and was updated based on latest Cluster 29 data, Dominion Energy recommended transmission changes and withdrawn generation. Projects in vicinity of Cluster 29 have been dispatched online at maximum power output with near unity power factor measured at the high-side of the main substation transformer. The dynamic models for Cluster 29 projects were updated based on the latest DP2 data and include any tuning adjustments recommended during Phase 2.

 

This analysis currently was performed using the PSSE library models provided the developer.  Dominion Energy Transmission provided the models for the FACT’s devices for the AF1-123, AF1-124, and AF1-125 queue projects.

 

Cluster 29 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. 133 contingencies were studied, each with a 20 second simulation time period. The studied contingencies included:

  • Steady-state operation (30 seconds)
  • Three-phase faults with normal clearing time
  • Single-phase bus faults with normal clearing time
  • Single-phase faults with stuck breaker
  • Single-phase faults with delayed clearing at remote end
  • Single-phase faults with loss of multiple-circuit tower line.

For all simulations, the projects under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance.

 

The results of the analysis were evaluated against the following recovery criteria per PJM’s Regional Transmission Planning Process and Transmission Owner criteria:

  • Cluster 29 projects were able to ride through the faults (except for faults where protective action trips a generator(s)).
  • The system with Cluster 29 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.
  • Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus) and the final voltages are within the steady-state voltage ranges below per Dominion Energy’s transmission planning criteria.
    • P1 Category Contingencies:
      • 0.93 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.93 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.01 to 1.096 p.u. for 500 kV facilities
    • P2, P4, P5, and P7 Category Contingencies:
      • 0.90 to 1.05 p.u. for 230, 115, 69 kV facilities
      • 0.90 to 1.03 p.u. for 138 kV facilities due to legacy switches
      • 1.00 to 1.096 p.u. for 500 kV facilities
  • No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

AF1-123, AF1-124 and AF1-125 met the 0.95 lagging and leading power factor requirements at the point of interconnect (POI) at Harpers 230 kV substation.

 

The results of the analysis identified that the addition of the AF1-123, AF1-124 and AF1-125 queue projects resulted in instability in a majority of contingencies. The following mitigation is required to maintain stability:

  • Add a second 500 kV line from the Updated Fentress to the Yadkin substations
  • Add two 230 kV gas-insulated lines (GILs) from the existing Fentress to the New Fentress substations
  • All 230 kV breakers (212822, 269T2128, 26922, 224022-1, 224022-2, 208722, W22, L122, L322, H22, SC122, SC322, SC422, SV122, and the new breakers G1 and G2 for the gas insulated lines) at Fentress 230 kV Substation require a 14 cycle clearing time
  • Dual pilot protection is required for the Fentress to AD1-033 POI 230 kV line circuit 2240

No voltage or frequency protection trips occurred for AF1-123, AF1-124 and AF1-125 queue projects using the settings provided.

 

The AF1-123, AF1-124 and AF1-125 queue projects exhibited slow active power recovery after the fault cleared and this is recovery was expected based on the model documentation provided for the OEMs’ wind turbine. The WGOWECC controller, clamps the active power at 95% for up to 5 seconds to ensure steady recovery of the system and then releases the active power to 100% to restore full operation.

 

An EMT analysis and stability analysis using a PSS/E user defined model is recommended for AF1-123, AF1-124 and AF1-125 due to the CSCR values being less than 3. A user defined model is under development by the IC and it will be evaluated as a sensitivity once the model initializes properly.

 

AE2-156 reactive power and terminal voltage recovery was not settling to a steady state value during the analysis. However, it was observed that reactive settling doesn’t violate PJM or Dominion’s criteria. The models were tuned to achieve a faster recovery in Cluster 46 Phase 2 Stability Analysis.

 

AE2-051 reactive power and terminal voltage recovery was not settling to a steady state value during the analysis. The models can be tuned to achieve a faster recovery upon request.

 

AB2-169 generator tripped for overvoltage’s above 1.25 p.u. The unit rode through when the pickup timer  was increased from 0.0 seconds to 0.0125 seconds.

 

Executive Summary for Dynamic Stability Analysis using PSCAD/EMT

 

The EMT dynamic performance analysis was revelated with the latest PSCAD models pprovided by CVOW (AF1-123, 124 & 125) generation developer.   A detailed model quality testing was performed. Below are some deficiency and corresponding update that were applied to the plant model.

 

  • CVOW initialization issues were cured by using a stiff voltage source model at POI during the initialization period and disconnected later in the simulation.
  • Pi-circuit equivalents for 66 kV IAC cables were updated to Bergeron models using best available data.
  • Onshore cable section was updated into onshore and HDD sections using best available data.
  • Earthing transformer model was included at the 66 kV delta winding of OSS transformer.
  • OSS LTC transformer taps were set to match values used for TC1 analysis.
  • Harpers STATCOM model was updated to latest OEM model.

 

Preliminary results of CVOW performance for Summer peak and Light Load system conditions for select TPL contingencies indicate the following:

 

  • Instability of the project post-fault was observed for select P1 and P6 contingencies prior to the inclusion of all proposed upgrades.
  • With the inclusion of the proposed upgrades namely the 500 kV Line 5005 between Fentress and Yadkin and two GIL circuits between new and existing Fentress 230 kV, CVOW fully recovers post-fault for a severe P4 contingency.
  • The preliminary results demonstrate the impact of the weak system strength and the improvements provided by the proposed upgrades.
  • Analysis of CVOW performance for severe P6 contingencies with the proposed upgrades is ongoing.
  • Investigation of partial nuisance tripping of CVOW post-fault is also on-going for other contingencies and system conditions.

 

CVOW Flicker

 

Preliminary analysis shows flicker issue induced by CVOW project. Preliminary flicker analysis was conducted using a range of ramp rates in the absence of data on power fluctuation in response to wind speed variation. To assess flicker impact, MEPPI evaluated multiple wind profiles, spanning from conservative scenarios to less conservative ramp rates. Results indicate that the ramp rate significantly influences the flicker observed at the POI and we violate the criteria of 1 Pst for various profiles considered. Flicker analysis was performed in PSCAD using detailed models of the CVOW project and a system equivalent at the POI.  In order to mitigate the flicker issue an addition of 300 MVAR STATCOM will need to be installed at Fentress 230 kV Substation.

 

Note:

 

TC1 Phase 3 Dynamic  Stability analysis has been completed by using library model provided in TC1 Phase 2.  For TC1 Phase 3, a PSSE User Defined Model was requested due to low SCR concerns in the area. The CVOW project developer provided a User Defined Model that did not work properly in the TC1 base case. The CVOW  project development team is actively working on getting an updated User Defined Model for the AF1-123/AF1-124/AF1-125 projects from Siemens Gamesa Renewable Energy (SGRE). This updated model was not ready at the time TC1 Phase 3 studies concluded, and CVOW will need to initiate a Necessary Study request post GIA to have the updated User Defined Model provided to PJM to perform a Dynamic Stability analysis for the AF1-123/AF1-124/AF1-125 projects.

Also, CVOW notified PJM of a change for nineteen (19) of the GSUs that are planned to be installed for the CVOW Project for Queue Position AF1-123 (OSS T1L11). Note that these 19 GSUs – installed in 19 of the 59 wind turbine generators – have been manufactured and have higher impedance values that was in the original design. Following evaluation, it has been determined that these changes in impedances to these 19 units do not affect the MFO/gross output, have very limited changes for the  losses, and the MW output at the POI will be changed, but insubstantially. The other queues AF1-124 & AF1-125 are unchanged/unaffected. This GSU change for AF1-123 will also be evaluated as part of the Necessary Study being requested above.

 

Bellow are some of the item that will be captured during post GIA Necessary study request for CVOW project.

 

  1. The User Defined Model dynamic stability analysis for AF1-123/AF1-124/AF1-125 as well as the GSU change for AF1-123.
  2. The EMT Analysis is based on PSCAD Models provided to PJM & DEV-ET on May 19th, the developers needs to confirm that these models are still valid and if updates to these models need to be made to represent changes made in the UDM please provide updated EMT models.
  3. As identified in the TC1 Phase 2 Reports and the June 2025 “EMT Generation Model Review” Report Nuisance Tripping is still occurring which can result in up to 1600 MW Tripping Off-Line.  This tripping is being initiated by the DC Protection Scheme of the WTGs, the developer needs to provide a solution to PJM & DEV-ET for this deficiency.   This solution will be evaluated in the NSA to determine if it resolves the nuisance tripping issue.  
  4. The developer needs to indicate if margin can be increased in the Over-Voltage Ride Through, Under Voltage Ride Through & Frequency Ride-Through to increase the margins from the PRC-024 & IEEE 2800 Requirements as identified in the TC1 Phase 2 Reports and the June 2025 “EMT Generation Model Review” Report.
  5. Preliminary Study Results indicate that the CVOW Project will result in a Pst Value greater than 1.  This will adversely impact Dominion’s Customers the proposed solution to this flicker issue will be to install a 300 MVAR STATCOM at Fentress Substation on the 230 kV Bus.   The developer can provide updated Ramp Rates  as part of the NSA to determine if mitigation is still required.

Reactive Power Analysis

The reactive power capability of Cluster 29 (AF1-123/124/125) met the 0.95 leading and lagging power factor requirement at measured at the point of interconnection (POI) Harper 230 kV substation.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project ID Project Name Status
AA1-063A Carolina–Seaboard 115kV In Service
AA1-065 Earleys 230kV In Service
AA1-067 Everetts 34.5kV In Service
AA1-139 Hickory-Shawboro 230kV In Service
AA1-145 Four Rivers 230kV In Service
AA2-053 Carolina-Jackson 115kV In Service
AA2-057 Hornertown-Whitakers 115kV In Service
AA2-088 Boykins-Handsome 115kV In Service
AA2-178 Mackeys 230kV In Service
AB1-027 Old Church 34.5 KV In Service
AB1-081 Anaconda-Mayo Dunbar 115kV In Service
AB1-132 Thelma 230kV In Service
AB1-173 Brink-Trego 115kV In Service
AB2-022 Elizabeth City 34.5kV In Service
AB2-024 Correctional 34.5kV In Service
AB2-025 Sapony 34.5kV In Service
AB2-026 Powhatan 34.5kV In Service
AB2-040 Brink 115kV In Service
AB2-043 Chase City 115kV In Service
AB2-059 Benson-Dunbar 115kV In Service
AB2-060 Chase City-Lunenburg 115kV In Service
AB2-077 Buggs Island-Chase City 115kV In Service
AB2-078 Buggs Island-Chase City 115kV In Service
AB2-079 Buggs Island-Chase City 115kV In Service
AB2-099 Ahoskie 34.5kV In Service
AB2-100 Clubhouse-Lakeview 230kV In Service
AB2-134 Hopewell-Surry 230kV In Service
AB2-161 Waverly #2 DP 115kV In Service
AB2-169 Pantago-Five Points 115kV In Service
AB2-174 Emporia-Trego 115kV In Service
AB2-190 Hopewell-Surry 230kV In Service
AC1-027 Pendleton 34.5kV In Service
AC1-034 Heartsease DP - Mayo Dunbar 115kV Suspended
AC1-036 Twittys Creek 34.5kV In Service
AC1-054 Kerr Dam–Eatons Ferry 115 kV In Service
AC1-065 Harmony Village-Shackleford 115kV Under Construction
AC1-075 Perth-Hickory Grove 115kV In Service
AC1-080 Perth-Hickory Grove 115kV In Service
AC1-086 Thelma 230kV Suspended
AC1-098 Dawson-South Justice 115kV Under Construction
AC1-099 Dawson-South Justice 115kV Under Construction
AC1-105 Halifax-Mt. Laurel 115kV In Service
AC1-112 Old Church 34.5kV In Service
AC1-118 Westmoreland 34.5kV In Service
AC1-147 Grassfield 34.5kV In Service
AC1-161 Septa 500kV In Service
AC1-164 Chickahominy 230kV Partially in Service - Under Construction
AC1-189 Chinquapin-Everetts 230kV Engineering & Procurement
AC1-191 Elmont 115kV Engineering & Procurement
AC1-208 Cox-Whitakers 115kV Under Construction
AC1-216 Hopewell-Surry 230kV In Service
AC1-221 Halifax-Person 230kV In Service
AC1-222 Crystal Hill-Halifax 115kV In Service
AC2-012 Grassfield-Great Bridge 115kV In Service
AC2-079 Ivor-Oak Ridge 115kV Suspended
AC2-084 Dawson-South Justice 115kV Under Construction
AC2-100 Halifax-Person 230kV In Service
AC2-137 Elko 34.5kV In Service
AC2-138 Northern Neck 34.5kV In Service
AC2-141 Septa 500kV Engineering & Procurement
AC2-165 Bremo-Powhatan 230kV Suspended
AD1-022 Cashie-Trowbridge 230 kV Engineering & Procurement
AD1-025 Hopewell-Surry 230 kV Under Construction
AD1-033 Fentress-Landstown 230 kV In Service
AD1-041 Harmony Village-Shackleford 115 kV In Service
AD1-056 Hornertown-Hathaway 230 kV Suspended
AD1-057 Hornertown-Hathaway 230 kV Suspended
AD1-063 Harmony Village 34.5 kV In Service
AD1-074 Trowbridge 230 kV Engineering & Procurement
AD1-075 Trowbridge 230 kV Engineering & Procurement
AD1-076 Trowbridge 230 kV Engineering & Procurement
AD1-082 Bakers Pond-Ivor 115kV In Service
AD1-087 Clover-Sedge Hill 230 kV In Service
AD1-088 Briery-Clover 230 kV Suspended
AD1-105 Kings Dominion DP 115 kV Under Construction
AD1-144 Kings Fork 34.5 kV In Service
AD1-151 Hopewell-Surry 230 kV Suspended
AD1-152 Clover-Sedge Hill 230 kV In Service
AD2-022 East Danville - Roxborough 230 kV Engineering & Procurement
AD2-023 East Danville - Roxborough 230 kV Engineering & Procurement
AD2-030 Wan 34.5 kV In Service
AD2-033 Chase City-Lunenburg 115 kV Engineering & Procurement
AD2-073 Sanders DP 230 kV In Service
AD2-074 Garner DP-Lancaster 115 kV Engineering & Procurement
AD2-085 Myrtle-Windsor DP 115kV Engineering & Procurement
AD2-202 Clover-Sedge Hill 230kV In Service
AE1-056 Red House-South Creek 115 kV Suspended
AE1-072 Shawboro-Sligo 230 kV Engineering & Procurement
AE1-074 Winterpock 34.5 kV Under Construction
AE1-075 Powhatan 34.5 kV In Service
AE1-103 Holland-Union Camp 115 kV Under Construction
AE1-108 Bremo-Scottsville 138 kV Engineering & Procurement
AE1-148 Kerr Dam-Ridge Rd 115 kV Active
AE1-149 Disputanta-Poe 115 kV Suspended
AE1-155 Garner-Northern Neck 115 kV In Service
AE1-157 Ladysmith CT-St. Johns 230 kV Suspended
AE1-162 Smithfield 34.5 kV In Service
AE1-173 Carson-Suffolk 500 kV Under Construction
AE1-175 Light Foot 34.5 kV In Service
AE1-190 Harmony Village-Shackleford 115 kV Partially in Service - Under Construction
AE1-191 Harmony Village-Shackleford 115 kV Partially in Service - Under Construction
AE2-027 Harrowgate-Locks 115kV Suspended
AE2-033 Clubhouse-Sapony 230 kV Suspended
AE2-034 Mackeys 230 kV Partially in Service - Under Construction
AE2-040 Sapony 34.5 kV Under Construction
AE2-041 Harmony Village 230 kV Engineering & Procurement
AE2-051 Carson-Septa 500 kV Engineering & Procurement
AE2-092 Kidds Store-Sherwood 115 kV Engineering & Procurement
AE2-094 Carson-Rogers Road 500 kV Engineering & Procurement
AE2-104 Suffolk 115 kV Suspended
AE2-156 Yadkin 115 kV Active
AE2-212 Harrowgate 34 kV Engineering & Procurement
AE2-247 Myrtle-Windsor 115 kV Engineering & Procurement
AE2-253 Hickory-Moyock 230 kV In Service
AE2-259 Curdsville-Willis Mtn 115 kV Engineering & Procurement
AE2-346 Ahoskie 34.5 kV In Service
AF1-017 Myrtle-Windsor 115 kV Engineering & Procurement
AF1-018 Harmony Village 230 kV Engineering & Procurement
AF1-028 Endless Caverns 115 kV Under Construction
AF1-032 Suffolk 34.5 kV In Service
AF1-042 Garner DP-Lancaster 115 kV Engineering & Procurement
AF1-058 Welco 34.5 kV In Service
AF1-069 Carson-Rogers Rd 500 kV Engineering & Procurement
AF1-114 Oak Grove-Dahlgren 230 kV Engineering & Procurement
AF1-123 Oceana 230 kV Active
AF1-124 Oceana 230 kV Active
AF1-128 Chesterfield 230 kV Active
AF1-129 Chesterfield 230 kV Engineering & Procurement
AF1-291 Tyler 34.5 kV Engineering & Procurement
AF1-292 Fields 34.5kV Engineering & Procurement
AF1-294 Jetersville-Ponton 115 kV Active
AF2-035 St. Johns 115 kV Active
AF2-042 Clover-Rawlings 500 kV Active
AF2-043 Suffolk 34.5 kV In Service
AF2-046 Tunis-Mapleton 115 kV Active
AF2-054 Wan 34.5 kV In Service
AF2-077 White Marsh 34.5 kV In Service
AF2-080 Chinquapin-Everetts 230 kV Active
AF2-081 Moyock 230 kV Active
AF2-085 Midlothian 34.5 kV In Service
AF2-091 Oak Grove-Dahlgren 230 kV Engineering & Procurement
AF2-110 Suffolk 115 kV Suspended
AF2-115 Jetersville-Ponton 115 kV Active
AF2-120 Garner-Northern Neck 115 kV Active
AF2-144 Powhatan 34.5 kV In Service
AF2-222 Madisonville DP-Twitty's Creek 115 kV Active
AF2-297 Sedge Hill 115 kV Active
AF2-299 Fields 34.5 kV Active
AG1-007 Tar River 12.5 kV Engineering & Procurement
AG1-008 Tunis-Mapleton 115 kV Active
AG1-021 Jetersville-Ponton 115 kV Active
AG1-037 Ahoskie 34.5 kV Engineering & Procurement
AG1-038 Garner DP-Lancaster 115 kV Engineering & Procurement
AG1-082 Ahoskie 34.5 kV Active
AG1-098 Briery-Clover 230 kV Active
AG1-105 Mount Laurel-Barnes Junction 115 kV Active
AG1-106 Thelma 230 kV Active
AG1-135 Garner-Lancaster 115 kV Active
AG1-145 Lightfoot 34.5 kV In Service
AG1-146 Garner DP-Lancaster 115 kV Active
AG1-147 Garner DP-Lancaster 115 kV Active
AG1-153 Heritage 500 kV Active
AG1-166 Lone Pine 115 kV Active
AG1-167 Lone Pine 115 kV Active
AG1-168 Lone Pine 115 kV Active
AG1-210 Northern Neck 34.5 kV Engineering & Procurement
AG1-282 Dunnsville 34.5 kV Engineering & Procurement
AG1-285 Chase City-Central 115 kV Active
AG1-342 Dryburg 115 kV Active
AG1-393 Fort Pickett DP 34.5 kV Active
AG1-394 Boykins 34.5 kV Active
AG1-532 Fields 34.5 kV Engineering & Procurement
AG1-536 Garner-Northern Neck 115 kV Active
AG1-551 Parmele 34.5 kV Active
AG1-552 Carolina 34.5 kV Active
AG1-558 Buckner 34.5 kV Engineering & Procurement
AG1-559 Caroline Pines 22 kV Engineering & Procurement
V4-068 Murphy's 34.5kV In Service
W1-029 Winfall 230kV In Service
Y1-086 Morgans Corner In Service
Z1-036 WinFall-Chowan 230kV In Service
Z1-068 Birdneck 34.5kV In Service
Z2-027 Pasquotank 34.5kV In Service
Z2-044 Whitakers 34.5kV In Service
Z2-088 Tarboro-Everetts 230kV In Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO) No Impact
New York Independent System Operator (NYISO) No Impact
Tennessee Valley Authority (TVA) No Impact
Louisville Gas & Electric (LG&E) No Impact
Duke Energy Carolinas (DUKE) No Impact
Duke Energy Progress – East (CPLE) No Impact
Duke Energy Progress – West (CPLW) No Impact

Affected System - Non-PJM Identified Violations

In accordance with PJM Tariff Part VII, Subpart D, section 312.A.1.b and as outlined in PJM Manual 14H, Section 13, in Phase III of the Cycle, PJM coordinates with the Affected System Operators to conduct any studies required to determine the impact of the New Service Request on any Affected System and will include the Affected System Study results in Phase III System Impact Study, if available from the Affected System Operator.

If your project required an Affected System Study, the results are shown below from the Affected System Operator.

For more details, please refer to your Affected System Study report by the Affected System Operator. If the Affected System Operator identified the need for a system reinforcement on their system due to their planning criteria, Project Developer must follow the Affected System Operator Tariff for construction of the network upgrade. PJM will list any required network upgrades identified by the Affected System Operator in the PJM Project Developer’s GIA under Schedule F.

Affected System network upgrade costs are included in the Adverse Study Impact calculation for DP3. See the Adverse Test Eligibility section of this Phase III SIS report.

Midcontinent Independent System Operator, Inc. (MISO) Not required
New York Independent System Operator (NYISO) Not required
Tennessee Valley Authority (TVA) Not required
Louisville Gas & Electric (LG&E) Not required
Duke Energy Carolinas (DUKE) Not required
Duke Energy Progress – East (CPLE) Not required
Duke Energy Progress – West (CPLW) Not required

System Reinforcements

Based on the Phase III analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AF1-125 System Reinforcements:
TO RTEP ID Title Category Allocated Cost ($USD) Facilities Study
Dominion n9139.0 Wreck and rebuild 37.41 miles of 500kV line 563 between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" and associated substation work. Cost Allocated $61,821,552
Dominion n9191.0 Rebuild 41.13 miles of line 576 between North Anna and Midlothian with triple bundled (3) 1351.5 ACSR (45/7) "Dipper" conductor and associated substation work. Cost Allocated $53,077,275
Dominion n9112.0 Wreck and Rebuild 12.4 miles of 230 kV line 259 with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Chesterfield. Cost Allocated $20,884,900
Dominion n9647.0 Install a 300 MVAR STATCOM at Fentress Substation. Cost Allocated $16,196,842
Dominion n9138.0 Wreck and rebuild 22.59 miles of Line #511 between Carson and Rawlings Substations with three (3) 1351 ACSS/TW and associated substation work. Cost Allocated $11,169,384
Dominion n9250.0 Construct a new 22.59 mile line between Carson and Rawlings Substations. Cost Allocated $10,927,946
Dominion n9153.0 Wreck and rebuild 5.9 miles of 230 kV line 2128 between Fentress and Thrasher with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Fentress. Cost Allocated $10,623,251
Dominion n9207.0 Replace 6ELMONT 230 kV to 8ELMONT 500 kV circuit 1 with larger transformer (3-480 MVA single phase transformer). Cost Allocated $9,689,986
Dominion n9630.0 Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers. Cost Allocated $8,992,232
Dominion n8492 Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line. Cost Allocated $8,057,884
Dominion n9378.0 Replace existing 230/500 kV Carson transformer 2 with (4)-480 MVA single phase transformers. Cost Allocated $7,774,931
Dominion n9379.0 Replace existing 230/500 kV Transformer 1 at Midlothian with (4)-480 MVA Single Phase transformers. Cost Allocated $7,197,262
Dominion n9267.0 Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner. Cost Allocated $4,596,198
Dominion n9259.0 Install two 230 kV gas insulated switchgear ("GIS") bus ties for the Coastal Virginia Offshore Wind ("CVOW") project. Cost Allocated $2,543,323
Dominion n7541 Add a third 224 MVA 230/115 kV transformer at Earleys Substation and supporting equipment. Cost Allocated $2,289,491
Dominion n6605 Wreck and rebuild 0.99 miles of line 271 between Pocaty and Landstown with (2)-768 ACSS (20/7) “MAUMEE” conductor @ 250 degrees C. Replace the line lead at Landstown. Cost Allocated $2,100,714
Dominion n8492.1 Two Breaker Additions at Fentress Substation. Cost Allocated $2,004,703
Dominion n8492.2 Expand Yadkin Substation to accommodate the new 500 kV line. Cost Allocated $1,628,931
Dominion n9199.0 Wreck and rebuild 1.63 miles of line 2193 between Fork Union and Bremo with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C and replace line lead at Bremo. Cost Allocated $1,458,123
Dominion n6588 Replace 230 kV breaker 210512 at Yadkin 230 kV with a 63 kA breaker. Cost Allocated $173,379
Dominion n9266.0 Replace switches 25944 and 25945 at Basin 230 kV (Basin - Chesterfield B). Cost Allocated $168,249
Dominion n9264.0 Replace Line Lead at Surry for increased rating on Line 567 8SURRY 500 KV to 8CHCKAHM 500 KV ckt 1. Cost Allocated $158,640
Dominion n9265.0 Replace 230 kV wave trap 259WT at Basin 230 kV (Basin - Chesterfield B). Cost Allocated $80,304
Dominion b4000.357 Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat. Contingent $0 N/A
Dominion b4000.356 Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section). Contingent $0 N/A
Dominion b4000.355 Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section). Contingent $0 N/A
Dominion b4000.352 Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point. Contingent $0 N/A
Dominion b4000.351 Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken. Contingent $0 N/A
Dominion b4000.350 Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken. Contingent $0 N/A
Dominion b4000.349 Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken. Contingent $0 N/A
Dominion b4000.348 Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. Contingent $0 N/A
Dominion b4000.346 Cut-in 500kV line from Kraken substation into Yeat substation Contingent $0 N/A
Dominion b4000.345 Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA. Contingent $0 N/A
Dominion b4000.344 Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA. Contingent $0 N/A
Dominion b4000.342 Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill. Contingent $0 N/A
Dominion b4000.341 Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site. Contingent $0 N/A
Dominion b4000.325 Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA. Contingent $0 N/A
Dominion b3689.2 Replace 230 kV breakers SC102, H302, H402 and 218302 at Brambleton substation with 80 kA Contingent $0 N/A
Dominion b4000.103 Brambleton Sub 230kV - replace 63kA breakers 217202, 2172T2183, L102, L202 with 80kA Contingent $0 N/A
Dominion b3800.405 Replace Brambleton 230 kV breakers 20102, 20602, 204502, 209402, 201T2045, 206T2094 with breakers rated 80 kA. Contingent $0 N/A
Dominion b3854.1 Replace over duty Carson 230kV circuit breakers 200272 and 24972-3 with an interrupting rating of 63 kA Contingent $0 N/A
Dominion b4000.108 Carson Sub 230kV - replace 40kA breaker 23872 with 63kA Contingent $0 N/A
Dominion b4000.326 At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith. Contingent $0 N/A
Dominion b4000.327 Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme. Contingent $0 N/A
Dominion b3800.406 Replace Gainesville 230 kV breaker 216192 with a breaker rated 80 kA. Contingent $0 N/A
Dominion b4000.115 Ladysmith Sub 500kV - replace 40kA breaker 574T581 with 63kA Contingent $0 N/A
Dominion b4000.354 Ladysmith substation breakers replacement: 574T575 and 568T581 Contingent $0 N/A
Dominion b3853.1 Replace over duty Ladysmith CT 230kV circuit breakers SX1272 and SX3472 with an interrupting rating of 63 kA Contingent $0 N/A
Dominion b4000.114 Ladysmith S1 Sub 230kV - replace 40kA breakers 25672, 209072, 256T2090, GT172, GT272, GT372, GT472, GT572 with 63kA Contingent $0 N/A
Dominion b3800.235 Replace 5 overdutied 230kV breakers at Loudoun substation with 80kA breakers Contingent $0 N/A
Dominion b3800.334 Replace four (4) overdutied 230 kV breakers at Loudoun Substation with 80 kA breakers. Contingent $0 N/A
Dominion b3800.407 Replace Loudoun 230 kV breakers 204552 and 217352 with breakers rated 80 kA. Contingent $0 N/A
Dominion b4000.119 Loudoun Cap Substation 230kV - replace 50 kA breaker SC352 with 63 kA. Contingent $0 N/A
Dominion b4000.128 North Anna Substation 500 kV - replace 40 kA breakers 57502, G102-1, G102-2, G202, G2T575, and XT573 with 63 kA. Contingent $0 N/A
Dominion b3800.408 Replace Ox 230 kV breakers 22042, 24342, 24842, 220T2063, 243T2097, 248T2013, and H342 with breakers rated 80 kA. Contingent $0 N/A
Dominion s2609.6 Upgrade two (2) 230 kV breakers 201342 and L142 from 50 kA to 63 kA at Ox Substation due to an insufficient breaker duty rating with the expansion in place. Contingent $0 N/A
Dominion s2609.9 Upgrade 230 kV Pleasant View breakers L3T203 and L3T2180 from 50 kA to 80 kA. Contingent $0 N/A
Dominion b4000.134 Remington Substation 230 kV - replace 40 kA and 50 kA breakers 211462, GT162, GT262, GT362, GT462, 2077T2086, 208662, H962, and H9T299 with 63 kA. Contingent $0 N/A
Dominion b1696 Install a breaker and a half scheme with a minimum of eight 230 kV breakers for five existing lines at Idylwood 230 kV: 20212 and 20712 Contingent $0 N/A
Dominion b3800.236 Replace 2 overdutied 500kV breakers at Ox Substation with 63kA breakers. Contingent $0 N/A
Dominion s3047.2 Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation. Contingent $0 N/A
Dominion b3800.312 Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way. Contingent $0 N/A
Dominion b3800.313 Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW. Contingent $0 N/A
Dominion b3800.356 Build a new 500 kV line from Vint Hill to Wishing Star. Contingent $0 N/A
Dominion b3800.357 Build a new 500 kV line from Morrisville to Vint Hill. Contingent $0 N/A
Dominion b3800.354 Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590. Contingent $0 N/A
Dominion b3800.335 Replace 1 overdutied 500kV breaker at Ox Substation with a 63kA breaker Contingent $0 N/A
Grand Total: $243,615,500

PJM evaluated the impact of topology changing reinforcements to mitigate the impacts driven by New Service Requests. PJM determined which reinforcements were eliminated as a result of modeling the topology changing reinforcements. PJM then grouped the topology changing and eliminated reinforcements by region and computed a discount factor to apply to reinforcements to reduce the cost of all these reinforcements down to the cost of contstructing only the topology changing reinforcements. For additional details, please click the icon below

Regional Topology Upgrade Conversion

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n8492
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492
Title
Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.
Description
Wreck and rebuild one (1) overhead 500kV transmission line that will start at the existing Fentress 500 kV Substation and terminate at the existing Yadkin 500 kV Substation, located approximately 13.5 miles away.
Total Cost ($USD)
$80,172,278
Discounted Total Cost ($USD)
$32,762,561
Allocated Cost ($USD)
$10,793,612
Time Estimate
26 to 27 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 833.0 MW 33.5% $10,964,730
AF1-124 836.0 MW 33.6% $11,004,219
AF1-125 820.0 MW 32.9% $10,793,612
System Reinforcement: n8492
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492
Title
Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line.
Description
Wreck and rebuild one (1) overhead 500kV transmission line that will start at the existing Fentress 500 kV Substation and terminate at the existing Yadkin 500 kV Substation, located approximately 13.5 miles away.
Total Cost ($USD)
$80,172,278
Allocated Cost ($USD)
$8,057,884
Time Estimate
26 to 27 Months
Cost Alloc Type
Cost Allocated
Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.5656 % $453,444
AE2-185 0.0346 % $27,723
AE2-187 0.0300 % $24,026
AE2-283 0.0305 % $24,489
AE2-291 0.5378 % $431,191
AF1-123 10.2087 % $8,184,585
AF1-124 10.2455 % $8,214,087
AF1-125 10.0507 % $8,057,884
AF1-294 0.4085 % $327,498
AF2-035 0.2624 % $210,403
AF2-042 28.1786 % $22,591,410
AF2-046 2.8849 % $2,312,893
AF2-115 0.2488 % $199,467
AF2-120 4.5021 % $3,609,464
AF2-222 3.8795 % $3,110,259
AF2-297 0.7165 % $574,450
AG1-008 2.8849 % $2,312,893
AG1-021 0.1990 % $159,581
AG1-082 0.1873 % $150,138
AG1-098 1.6029 % $1,285,072
AG1-105 0.6819 % $546,689
AG1-124 1.0619 % $851,346
AG1-135 4.4165 % $3,540,779
AG1-146 2.1236 % $1,702,543
AG1-147 4.9550 % $3,972,502
AG1-154 0.1382 % $110,813
AG1-166 0.1304 % $104,532
AG1-167 0.0978 % $78,402
AG1-168 0.0978 % $78,402
AG1-285 2.7978 % $2,243,090
AG1-342 0.0630 % $50,509
AG1-494 0.8172 % $655,201
AG1-536 4.9600 % $3,976,511

System Reinforcement: n9647.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9647.0
Title
Install a 300 MVAR STATCOM at Fentress Substation.
Description
Install a 300 MVAR STATCOM at Fentress Substation.
Total Cost ($USD)
$49,163,341
Discounted Total Cost ($USD)
$49,163,341
Allocated Cost ($USD)
$16,196,842
Time Estimate
Mar 31 2029

Contributor

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 833.0 MW 33.5% $16,453,621
AF1-124 836.0 MW 33.6% $16,512,878
AF1-125 820.0 MW 32.9% $16,196,842

System Reinforcement: n9259.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9259.0
Title
Install two 230 kV gas insulated switchgear ("GIS") bus ties for the Coastal Virginia Offshore Wind ("CVOW") project.
Description
Install two 230 kV gas insulated switchgear ("GIS") bus ties for the Coastal Virginia Offshore Wind ("CVOW") project.
Total Cost ($USD)
$25,304,902
Discounted Total Cost ($USD)
$10,340,899
Allocated Cost ($USD)
$3,406,805
Time Estimate
38 to 39 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 833.0 MW 33.5% $3,460,815
AF1-124 836.0 MW 33.6% $3,473,279
AF1-125 820.0 MW 32.9% $3,406,805
System Reinforcement: n9259.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9259.0
Title
Install two 230 kV gas insulated switchgear ("GIS") bus ties for the Coastal Virginia Offshore Wind ("CVOW") project.
Description
Install two 230 kV gas insulated switchgear ("GIS") bus ties for the Coastal Virginia Offshore Wind ("CVOW") project.
Total Cost ($USD)
$25,304,902
Allocated Cost ($USD)
$2,543,323
Time Estimate
38 to 39 Months
Cost Alloc Type
Cost Allocated
Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.5656 % $143,121
AE2-185 0.0346 % $8,750
AE2-187 0.0300 % $7,583
AE2-283 0.0305 % $7,730
AE2-291 0.5378 % $136,097
AF1-123 10.2087 % $2,583,313
AF1-124 10.2455 % $2,592,625
AF1-125 10.0507 % $2,543,323
AF1-294 0.4085 % $103,369
AF2-035 0.2624 % $66,410
AF2-042 28.1786 % $7,130,562
AF2-046 2.8849 % $730,022
AF2-115 0.2488 % $62,958
AF2-120 4.5021 % $1,139,261
AF2-222 3.8795 % $981,696
AF2-297 0.7165 % $181,315
AG1-008 2.8849 % $730,022
AG1-021 0.1990 % $50,369
AG1-082 0.1873 % $47,388
AG1-098 1.6029 % $405,609
AG1-105 0.6819 % $172,552
AG1-124 1.0619 % $268,712
AG1-135 4.4165 % $1,117,582
AG1-146 2.1236 % $537,376
AG1-147 4.9550 % $1,253,847
AG1-154 0.1382 % $34,976
AG1-166 0.1304 % $32,994
AG1-167 0.0978 % $24,746
AG1-168 0.0978 % $24,746
AG1-285 2.7978 % $707,990
AG1-342 0.0630 % $15,942
AG1-494 0.8172 % $206,802
AG1-536 4.9600 % $1,255,112

System Reinforcement: n8492.1
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.1
Title
Two Breaker Additions at Fentress Substation.
Description
Install Two 5000 amp GIS Breakers at Fentress Substation to connect the new 500 kV line 5005.
Total Cost ($USD)
$19,945,879
Discounted Total Cost ($USD)
$8,150,923
Allocated Cost ($USD)
$2,685,318
Time Estimate
30 to 36 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 833.0 MW 33.5% $2,727,890
AF1-124 836.0 MW 33.6% $2,737,715
AF1-125 820.0 MW 32.9% $2,685,318
System Reinforcement: n8492.1
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.1
Title
Two Breaker Additions at Fentress Substation.
Description
Install Two 5000 amp GIS Breakers at Fentress Substation to connect the new 500 kV line 5005.
Total Cost ($USD)
$19,945,879
Allocated Cost ($USD)
$2,004,703
Time Estimate
30 to 36 Months
Cost Alloc Type
Cost Allocated
Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.5656 % $112,811
AE2-185 0.0346 % $6,897
AE2-187 0.0300 % $5,977
AE2-283 0.0305 % $6,093
AE2-291 0.5378 % $107,275
AF1-123 10.2087 % $2,036,224
AF1-124 10.2455 % $2,043,564
AF1-125 10.0507 % $2,004,703
AF1-294 0.4085 % $81,478
AF2-035 0.2624 % $52,346
AF2-042 28.1786 % $5,620,466
AF2-046 2.8849 % $575,419
AF2-115 0.2488 % $49,625
AF2-120 4.5021 % $897,990
AF2-222 3.8795 % $773,794
AF2-297 0.7165 % $142,916
AG1-008 2.8849 % $575,419
AG1-021 0.1990 % $39,702
AG1-082 0.1873 % $37,353
AG1-098 1.6029 % $319,710
AG1-105 0.6819 % $136,010
AG1-124 1.0619 % $211,804
AG1-135 4.4165 % $880,902
AG1-146 2.1236 % $423,572
AG1-147 4.9550 % $988,310
AG1-154 0.1382 % $27,569
AG1-166 0.1304 % $26,006
AG1-167 0.0978 % $19,506
AG1-168 0.0978 % $19,506
AG1-285 2.7978 % $558,053
AG1-342 0.0630 % $12,566
AG1-494 0.8172 % $163,006
AG1-536 4.9600 % $989,307

System Reinforcement: n8492.2
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.2
Title
Expand Yadkin Substation to accommodate the new 500 kV line.
Description
Expansion of yadkins 500 kV switchyard to accommodate the new 500 kV line which includes addition of 5000 amp GIS breakers and relocation of the existing suffolk -yadkin 500 kV line#565
Total Cost ($USD)
$16,207,123
Discounted Total Cost ($USD)
$6,623,073
Allocated Cost ($USD)
$2,181,969
Time Estimate
15 to 16 Months

ContributorTopology Changing

Note: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement. Hence, this project is receiving a cost allocation based on its MW contribution to the need for this topology changing reinforcement but at a reduced amount considering the other reinforcements that were able to be eliminated. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 833.0 MW 33.5% $2,216,561
AF1-124 836.0 MW 33.6% $2,224,544
AF1-125 820.0 MW 32.9% $2,181,969
System Reinforcement: n8492.2
Type
Stability
TO
Dominion
RTEP ID / TO ID
n8492.2
Title
Expand Yadkin Substation to accommodate the new 500 kV line.
Description
Expansion of yadkins 500 kV switchyard to accommodate the new 500 kV line which includes addition of 5000 amp GIS breakers and relocation of the existing suffolk -yadkin 500 kV line#565
Total Cost ($USD)
$16,207,123
Allocated Cost ($USD)
$1,628,931
Time Estimate
15 to 16 Months
Cost Alloc Type
Cost Allocated
Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.5656 % $91,665
AE2-185 0.0346 % $5,604
AE2-187 0.0300 % $4,857
AE2-283 0.0305 % $4,951
AE2-291 0.5378 % $87,167
AF1-123 10.2087 % $1,654,544
AF1-124 10.2455 % $1,660,508
AF1-125 10.0507 % $1,628,931
AF1-294 0.4085 % $66,205
AF2-035 0.2624 % $42,534
AF2-042 28.1786 % $4,566,937
AF2-046 2.8849 % $467,560
AF2-115 0.2488 % $40,323
AF2-120 4.5021 % $729,667
AF2-222 3.8795 % $628,750
AF2-297 0.7165 % $116,127
AG1-008 2.8849 % $467,560
AG1-021 0.1990 % $32,260
AG1-082 0.1873 % $30,351
AG1-098 1.6029 % $259,782
AG1-105 0.6819 % $110,515
AG1-124 1.0619 % $172,103
AG1-135 4.4165 % $715,782
AG1-146 2.1236 % $344,175
AG1-147 4.9550 % $803,056
AG1-154 0.1382 % $22,401
AG1-166 0.1304 % $21,132
AG1-167 0.0978 % $15,849
AG1-168 0.0978 % $15,849
AG1-285 2.7978 % $453,449
AG1-342 0.0630 % $10,211
AG1-494 0.8172 % $132,451
AG1-536 4.9600 % $803,866

System Reinforcement: n6588
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
n6588 / TC1-PH2-DOM-034
Title
Replace 230 kV breaker 210512 at Yadkin 230 kV with a 63 kA breaker.
Description
Replace 230kV breaker 210512 at Yadkin 230 kV with a 63 kA breaker.
Total Cost ($USD)
$1,725,040
Discounted Total Cost ($USD)
$1,725,040
Allocated Cost ($USD)
$173,379
Time Estimate
Dec 01 2028

Contributor

Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.57% $9,757
AE2-185 0.03% $597
AE2-187 0.03% $518
AE2-283 0.03% $526
AE2-291 0.54% $9,277
AF1-123 10.21% $176,104
AF1-124 10.25% $176,739
AF1-125 10.05% $173,379
AF1-294 0.41% $7,047
AF2-035 0.26% $4,527
AF2-042 28.18% $486,093
AF2-046 2.88% $49,766
AF2-115 0.25% $4,292
AF2-120 4.50% $77,663
AF2-222 3.88% $66,923
AF2-297 0.72% $12,360
AG1-008 2.88% $49,766
AG1-021 0.20% $3,433
AG1-082 0.19% $3,231
AG1-098 1.60% $27,651
AG1-105 0.68% $11,763
AG1-124 1.06% $18,318
AG1-135 4.42% $76,186
AG1-146 2.12% $36,633
AG1-147 4.96% $85,476
AG1-154 0.14% $2,384
AG1-166 0.13% $2,249
AG1-167 0.10% $1,687
AG1-168 0.10% $1,687
AG1-285 2.80% $48,263
AG1-342 0.06% $1,087
AG1-494 0.82% $14,097
AG1-536 4.96% $85,562

System Reinforcement: n9139.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9139.0 / TC1-PH1-DOM-073
Title
Wreck and rebuild 37.41 miles of 500kV line 563 between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" and associated substation work.
Description
Wreck and rebuild 37.41 miles of 500kV transmission line 563 between Midlothian and Carson with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA. Remove wave traps.
Total Cost ($USD)
$245,455,768
Discounted Total Cost ($USD)
$245,455,768
Allocated Cost ($USD)
$61,821,552
Time Estimate
69 to 70 Months

Contributor

Facility Contingency
8CARSON-8MDLTHAN 500.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
205.2 MW 25.6% $62,801,501
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
205.9 MW 25.7% $63,027,667
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
202.0 MW 25.2% $61,821,552
AF2-042 131.7 MW 16.4% $40,306,135
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
28.6 MW 3.6% $8,749,456
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
28.6 MW 3.6% $8,749,456

System Reinforcement: n9191.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9191.0 / TC1-PH1-DOM-090
Title
Rebuild 41.13 miles of line 576 between North Anna and Midlothian with triple bundled (3) 1351.5 ACSR (45/7) "Dipper" conductor and associated substation work.
Description
Rebuild 41.13 miles of line 576 between North Anna and Midlothian with triple bundled (3) 1351.5 ACSR (45/7) "Dipper" conductor at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA.
Total Cost ($USD)
$256,706,175
Discounted Total Cost ($USD)
$256,706,175
Allocated Cost ($USD)
$53,077,275
Time Estimate
74 to 75 Months

Contributor

Facility Contingency
8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
69.0 MW 21.0% $53,907,719
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
69.2 MW 21.1% $54,099,119
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
67.9 MW 20.7% $53,077,275
AF2-042 80.4 MW 24.5% $62,827,757
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
21.0 MW 6.4% $16,397,152
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
21.0 MW 6.4% $16,397,152

System Reinforcement: n9246.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9246.0 / TC1-PH2-DOM-040
Title
Wreck and rebuild 18.75 miles of Line 594 btwn Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA.
Description
Wreck and rebuild 18.75 miles of Line 594 between Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA.
Total Cost ($USD)
$128,018,212
Discounted Total Cost ($USD)
$52,314,898
Allocated Cost ($USD)
$9,792,900
Time Estimate
60 to 61 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
8MORRSVL-8SPOTSYL 500.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
39.9 MW 19.0% $9,946,085
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
40.1 MW 19.1% $9,981,455
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
39.3 MW 18.7% $9,792,900
AF2-042 51.0 MW 24.3% $12,713,882
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
19.8 MW 9.4% $4,940,288
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
19.8 MW 9.4% $4,940,288

System Reinforcement: n9112.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9112.0 / TC1-PH2-DOM-063
Title
Wreck and Rebuild 12.4 miles of 230 kV line 259 with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Chesterfield.
Description
Wreck and Rebuild 12.4 miles of 230 kV line 259 with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Chesterfield.
Total Cost ($USD)
$87,030,447
Discounted Total Cost ($USD)
$87,030,447
Allocated Cost ($USD)
$20,884,900
Time Estimate
46 to 47 Months

Contributor

Facility Contingency
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
45.1 MW 24.4% $21,216,354
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
45.3 MW 24.5% $21,292,518
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
44.4 MW 24.0% $20,884,900
AF2-042 33.2 MW 17.9% $15,607,492
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
8.5 MW 4.6% $4,014,591
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
8.5 MW 4.6% $4,014,591

System Reinforcement: n9247.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9247.0 / TC1-PH2-DOM-041
Title
Wreck and rebuild 14.02 miles of Line 573 btwn Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA.
Description
Wreck and rebuild 14.02 miles of Line 573 between Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and associated substation work to achieve new rating of 4356/4356/5009 MVA
Total Cost ($USD)
$99,636,684
Discounted Total Cost ($USD)
$40,716,730
Allocated Cost ($USD)
$7,624,902
Time Estimate
48 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
40.9 MW 19.0% $7,744,115
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
41.1 MW 19.1% $7,771,742
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
40.3 MW 18.7% $7,624,902
AF2-042 52.5 MW 24.4% $9,931,957
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
20.2 MW 9.4% $3,822,007
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
20.2 MW 9.4% $3,822,007

System Reinforcement: n9263.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9263.0 / TC1-PH2-DOM-062
Title
Wreck and Rebuild 14.83 miles of 230 kV line 256 with (2) 768.2 ACSS/TW (20/7) ""Maumee"" conductor @ 250 degrees C.
Description
Wreck and Rebuild 14.83 miles of 230 kV line 256 with (2) 768.2 ACSS/TW (20/7) ""Maumee"" conductor @ 250 degrees C.
Total Cost ($USD)
$41,037,004
Discounted Total Cost ($USD)
$16,769,854
Allocated Cost ($USD)
$5,525,610
Time Estimate
46 to 47 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
6STJOHN-6FOUR RIVERS 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
20.7 MW 33.5% $5,612,091
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
20.8 MW 33.6% $5,632,153
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
20.4 MW 32.9% $5,525,610

System Reinforcement: n7568
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n7568 / dom-369
Title
Wreck and rebuild 6.47 miles of 230 kV transmission line 2028 between Charlottesville and Mt. Eagle with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C and replace line lead at Mt. Eagle.
Description
Wreck and rebuild 6.47 miles of 230 kV transmission line 2028 between Charlottesville and Mt. Eagle with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C and replace line lead at Mt. Eagle.
Total Cost ($USD)
$36,802,018
Discounted Total Cost ($USD)
$15,039,218
Allocated Cost ($USD)
$4,955,126
Time Estimate
43 to 44 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
6CHARLVL-6MTEAGLE 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
35.0 MW 33.5% $5,032,707
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
35.2 MW 33.6% $5,051,384
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.5 MW 32.9% $4,955,126

System Reinforcement: n9153.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9153.0 / TC1-PH1-DOM-043
Title
Wreck and rebuild 5.9 miles of 230 kV line 2128 between Fentress and Thrasher with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Fentress.
Description
Wreck and rebuild 5.9 miles of 230 kV line 2128 between Fentress and Thrasher with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @ 250 degrees C and replace line lead at Fentress.
Total Cost ($USD)
$33,297,247
Discounted Total Cost ($USD)
$33,297,247
Allocated Cost ($USD)
$10,623,251
Time Estimate
43 to 44 Months

Contributor

Facility Contingency
6FENTRES-6THRASHER 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-156 18.7 MW 1.6% $532,572
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
378.9 MW 32.4% $10,791,567
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
380.3 MW 32.5% $10,830,584
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
373.0 MW 31.9% $10,623,251
AF2-081 18.2 MW 1.6% $519,272

System Reinforcement: n9207.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9207.0 / TC1-PH2-DOM-018
Title
Replace 6ELMONT 230 kV to 8ELMONT 500 kV circuit 1 with larger transformer (3-480 MVA single phase transformer).
Description
Replace 6ELMONT 230 KV to 8ELMONT 500 kV ckt 1 with Larger XFRM. (3-480 MVA Single Phase XFRM).
Total Cost ($USD)
$38,254,469
Discounted Total Cost ($USD)
$38,254,469
Allocated Cost ($USD)
$9,689,986
Time Estimate
59 to 60 Months

Contributor

Facility Contingency
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE2-156 14.4 MW 3.1% $1,200,552
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
117.8 MW 25.7% $9,843,658
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
118.2 MW 25.8% $9,879,089
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
116.0 MW 25.3% $9,689,986
AF2-035 11.0 MW 2.4% $919,947
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
15.3 MW 3.3% $1,278,517
AF2-081 11.2 MW 2.4% $936,743
AF2-120 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
10.0 MW 2.2% $834,462
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
15.3 MW 3.3% $1,278,517
AG1-146 AG1-146 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-146, AG1-147
5.0 MW 1.1% $415,058
AG1-147 AG1-146 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-146, AG1-147
11.6 MW 2.5% $968,497
AG1-536 AE1-155 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-120, AG1-536
12.1 MW 2.6% $1,009,443

System Reinforcement: n9378.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9378.0 / TC1-PH3-DOM-010
Title
Replace existing 230/500 kV Carson transformer 2 with (4)-480 MVA single phase transformers.
Description
Replace Existing 230/500 kV Carson transformer 2 with (4)-480 MVA Single Phase transformers.
Total Cost ($USD)
$37,801,301
Discounted Total Cost ($USD)
$37,801,301
Allocated Cost ($USD)
$7,774,931
Time Estimate
Dec 31 2029

Contributor

Facility Contingency
6CARSON-8CARSON 230.0/500.0 kV Ckt 2 transformer (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
54.3 MW 20.9% $7,898,102
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
54.5 MW 21.0% $7,926,605
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
53.5 MW 20.6% $7,774,931
AF2-042 61.7 MW 23.8% $8,977,853
AF2-222 12.6 MW 4.9% $1,839,139
AG1-098 11.3 MW 4.4% $1,648,056
AG1-153 11.9 MW 4.6% $1,736,617

System Reinforcement: n9379.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9379.0 / TC1-PH3-DOM-011
Title
Replace existing 230/500 kV Transformer 1 at Midlothian with (4)-480 MVA Single Phase transformers.
Description
Replace existing 230/500 kV Transformer 1 at Midlothian with (4)-480 MVA Single Phase 500/230 kV transformers.
Total Cost ($USD)
$37,836,293
Discounted Total Cost ($USD)
$37,836,293
Allocated Cost ($USD)
$7,197,262
Time Estimate
Dec 31 2029

Contributor

Facility Contingency
6MDLTHAN-8MDLTHAN 230.0/500.0 kV Ckt 1 transformer (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
18.8 MW 19.3% $7,309,853
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
18.9 MW 19.4% $7,335,865
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
18.5 MW 19.0% $7,197,262
AF2-042 29.3 MW 30.1% $11,386,412
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
5.9 MW 6.1% $2,303,450
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
5.9 MW 6.1% $2,303,450

System Reinforcement: n9203.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9203.0 / TC1-PH2-DOM-008
Title
Wreck and rebuild 10.74 miles of line 2028 between Fork Union and Cunningham (Grape Vine) with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C.
Description
Wreck and rebuild 10.74 miles of line 2028 between Fork Union and Cunningham (Grape Vine) with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C.
Total Cost ($USD)
$29,539,973
Discounted Total Cost ($USD)
$12,071,569
Allocated Cost ($USD)
$2,342,629
Time Estimate
45 to 46 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
6CUNNING-6FORK UNION 230.0 kV Ckt 1 line (Any)
6GRAPEVINE-6FORK UNION 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
35.0 MW 19.7% $2,379,307
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
35.2 MW 19.8% $2,388,137
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.5 MW 19.4% $2,342,629
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021, AH1-280
4.9 MW 2.8% $335,331
AF2-042 25.8 MW 14.5% $1,751,708
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021, AH1-280
3.0 MW 1.7% $203,902
AF2-222 18.4 MW 10.3% $1,248,813
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021, AH1-280
2.4 MW 1.4% $163,149
AG1-098 7.8 MW 4.4% $528,025
AG1-285 10.8 MW 6.1% $730,569

System Reinforcement: n9644.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9644.0 / TC1-PH3-DOM-006
Title
Upgrade a 2.73 mile segment of 230kV transmission line 2028 between Mt. Eagle and Grape Vine. This segment runs from Grape Vine substation to structure 2080/73.
Description
Rebuild a 2.73 mile segment of 230kV line 2028 between Mt. Eagle and Grape Vinew with (2) 768.2 ACSS/TW (20/7) "MAUMEE" conductor @250 degrees C.
Total Cost ($USD)
$8,415,380
Discounted Total Cost ($USD)
$3,438,962
Allocated Cost ($USD)
$1,133,070
Time Estimate
Mar 31 2029

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line (Any)
6GRAPEVINE-6MTEAGLE 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
35.0 MW 33.5% $1,150,810
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
35.2 MW 33.6% $1,155,081
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.5 MW 32.9% $1,133,070

System Reinforcement: n7569
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n7569 / dom-490
Title
Upgrade a 3.78 mile segment of 230kV transmission line 2028 between Mt. Eagle and Grape Vine Substations at structure 2080/73.
Description
Uograde 3.78 miles of transmission line 2028 between Mt. Eagle and Grape Vine with (2) 768.2 ACSS/TW (20/7) "MAUMEE". The segment runs from Mt Eagle to structure 2080/73.
Total Cost ($USD)
$13,360,242
Discounted Total Cost ($USD)
$5,459,690
Allocated Cost ($USD)
$1,059,517
Time Estimate
43 to 44 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
6CUNNING-6MTEAGLE 230.0 kV Ckt 1 line (Any)
6GRAPEVINE-6MTEAGLE 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
35.0 MW 19.7% $1,076,105
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
35.2 MW 19.8% $1,080,099
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
34.5 MW 19.4% $1,059,517
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021, AH1-280
4.9 MW 2.8% $151,662
AF2-042 25.8 MW 14.5% $792,257
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021, AH1-280
3.0 MW 1.7% $92,220
AF2-222 18.4 MW 10.3% $564,809
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021, AH1-280
2.4 MW 1.4% $73,788
AG1-098 7.8 MW 4.4% $238,814
AG1-285 10.8 MW 6.1% $330,419

System Reinforcement: n6605
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n6605 / dom-101
Title
Wreck and rebuild 0.99 miles of line 271 between Pocaty and Landstown with (2)-768 ACSS (20/7) “MAUMEE” conductor @ 250 degrees C. Replace the line lead at Landstown.
Description
Wreck and rebuild 0.99 miles of line 271 between Pocaty and Landstown with (2)-768 ACSS (20/7) “MAUMEE” conductor @ 250 degrees C. Replace the line lead at Landstown.
Total Cost ($USD)
$6,555,756
Discounted Total Cost ($USD)
$6,555,756
Allocated Cost ($USD)
$2,100,714
Time Estimate
Dec 31 2026

Contributor

Facility Contingency
6LANDSTN-AD1-033 TAP 230.0 kV Ckt 1 line (Any)
6LANDSTN-6POCATY 230.0 kV Ckt 1 line (Any)
6LANDSTN-6POCATY 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
129.1 MW 32.6% $2,134,024
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
129.6 MW 32.7% $2,141,694
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
127.1 MW 32.0% $2,100,714
AF2-081 10.8 MW 2.7% $179,324

System Reinforcement: n9199.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9199.0 / TC1-PH2-DOM-004
Title
Wreck and rebuild 1.63 miles of line 2193 between Fork Union and Bremo with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C and replace line lead at Bremo.
Description
Wreck and rebuild 1.63 miles of line 2193 between Fork Union and Bremo with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C and replace line lead at Bremo.
Total Cost ($USD)
$7,947,612
Discounted Total Cost ($USD)
$7,947,612
Allocated Cost ($USD)
$1,458,123
Time Estimate
42 to 43 Months

Contributor

Facility Contingency
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line (Any)
6BREMODIST-6BREMO 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
68.5 MW 18.6% $1,481,048
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
68.7 MW 18.7% $1,486,238
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
67.4 MW 18.3% $1,458,123
AF1-294 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021, AH1-280
11.0 MW 3.0% $238,032
AF2-042 57.6 MW 15.7% $1,246,476
AF2-115 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021, AH1-280
6.7 MW 1.8% $144,731
AF2-222 40.9 MW 11.1% $885,125
AG1-021 AF1-294 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-294, AF2-115, AG1-021, AH1-280
5.4 MW 1.5% $115,793
AG1-098 17.4 MW 4.7% $375,582
AG1-285 23.9 MW 6.5% $516,464

System Reinforcement: n6161
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n6161 / dom-039
Title
Replace 500 kV circuit breaker H1T561 at Clifton with a higher rated device (Clifton - Ox).
Description
Replace 500 kV circuit breaker H1T561 at Clifton with a higher rated device (Clifton - Ox).
Total Cost ($USD)
$2,634,901
Discounted Total Cost ($USD)
$1,076,758
Allocated Cost ($USD)
$354,737
Time Estimate
Dec 31 2029

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
8CLIFTON-8OX 500.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
97.5 MW 33.5% $360,360
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
97.9 MW 33.6% $361,661
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
96.0 MW 32.9% $354,737

System Reinforcement: n9198.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9198.0 / TC1-PH2-DOM-003
Title
Replace Circuit Breaker 219322 and Circuit Breaker Lead at Bremo 230 kV (Bremo - Fork Union).
Description
Replace Circuit Breaker 219322 and Circuit Breaker Lead at Bremo 230 kV (Bremo - Fork Union).
Total Cost ($USD)
$2,113,879
Discounted Total Cost ($USD)
$863,841
Allocated Cost ($USD)
$284,626
Time Estimate
40 to 41 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
6FORK UNION-6BREMODIST 230.0 kV Ckt 1 line (Any)
6BREMODIST-6BREMO 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
68.5 MW 33.5% $289,101
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
68.7 MW 33.6% $290,114
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
67.4 MW 32.9% $284,626

System Reinforcement: n9262.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9262.0 / TC1-PH2-DOM-061
Title
Replace wave trap 256WT at Four River 230 kV station (Four River - St. John).
Description
Replace wave trap 256WT at Four River 230 kV station (Four River - St. John).
Total Cost ($USD)
$514,454
Discounted Total Cost ($USD)
$210,233
Allocated Cost ($USD)
$69,271
Time Estimate
14 to 15 Months

ContributorEliminated

Note: The topology changing reinforcements listed in the Cycle executive summary report eliminated the need for this reinforcement and it is no longer required by the Cycle. However, this project is receiving cost allocation based on its MW contribution to this eliminated reinforcement to fund the topology reinforcements which together alleviated the need for this reinforcement. This project's cost allocation is based on the pro rata share of the MW impacts from all cost allocated contributors multiplied by the relevant regional discount factor listed in the executive summary report.

Since this project contributed to a violation with a reinforcement that was eliminated by the topology changing reinforcements, this project is contingent on all of the topology changing reinforcements within the region in which the eliminated reinforcement belongs.

Facility Contingency
6STJOHN-6FOUR RIVERS 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
20.7 MW 33.5% $70,355
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
20.8 MW 33.6% $70,607
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
20.4 MW 32.9% $69,271

System Reinforcement: n9266.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9266.0 / TC1-PH2-DOM-065
Title
Replace switches 25944 and 25945 at Basin 230 kV (Basin - Chesterfield B).
Description
Replace switches 25944 and 25945 at Basin 230 kV (Basin - Chesterfield B).
Total Cost ($USD)
$701,120
Discounted Total Cost ($USD)
$701,120
Allocated Cost ($USD)
$168,249
Time Estimate
38 to 39 Months

Contributor

Facility Contingency
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
45.1 MW 24.4% $170,920
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
45.3 MW 24.5% $171,533
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
44.4 MW 24.0% $168,249
AF2-042 33.2 MW 17.9% $125,734
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
8.5 MW 4.6% $32,342
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
8.5 MW 4.6% $32,342

System Reinforcement: n9264.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9264.0 / TC1-PH1-DOM-080
Title
Replace Line Lead at Surry for increased rating on Line 567 8SURRY 500 KV to 8CHCKAHM 500 KV ckt 1.
Description
Replace Line Lead at Surry for increased rating on Line 567 8SURRY 500 KV to 8CHCKAHM 500 KV ckt 1.
Total Cost ($USD)
$582,006
Discounted Total Cost ($USD)
$582,006
Allocated Cost ($USD)
$158,640
Time Estimate
12 to 13 Months

Contributor

Facility Contingency
8CHCKAHM-8SURRY 500.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
250.1 MW 27.7% $161,155
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
251.0 MW 27.8% $161,735
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
246.2 MW 27.3% $158,640
AF2-042 99.3 MW 11.0% $64,014
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
28.3 MW 3.1% $18,231
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
28.3 MW 3.1% $18,231

System Reinforcement: n9265.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9265.0 / TC1-PH2-DOM-064
Title
Replace 230 kV wave trap 259WT at Basin 230 kV (Basin - Chesterfield B).
Description
Replace 230 kV wave trap 259WT at Basin 230 kV (Basin - Chesterfield B).
Total Cost ($USD)
$396,021
Discounted Total Cost ($USD)
$396,021
Allocated Cost ($USD)
$80,304
Time Estimate
14 to 15 Months

Contributor

Facility Contingency
6BASIN-6CHESTF B 230.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AF1-123 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
15.3 MW 20.6% $81,561
AF1-124 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
15.4 MW 20.7% $81,854
AF1-125 CVOW Harpers 230 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-123, AF1-124, AF1-125
15.1 MW 20.3% $80,304
AF2-042 17.3 MW 23.3% $92,294
AF2-046 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
5.6 MW 7.6% $30,005
AG1-008 AF2-046 115 kV - Dominion: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-046, AG1-008
5.6 MW 7.6% $30,005

System Reinforcement
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
(Pending)
Title
Bremo transformer #7 is in service with ratings 290/290/332 MVA.
Description
Bremo transformer #7 is in service with ratings 290/290/332 MVA.
Total Cost ($USD)
$0
Discounted Total Cost ($USD)
$0
Allocated Cost ($USD)
$0
Time Estimate
TBD

Note: This reinforcement is fictitious and will not be cost allocated to projects. It is listed for information purposes only.

Facility Contingency
3BREMO-6BREMO 115.0/230.0 kV Ckt 1 transformer (Any)

System Reinforcement: b4000.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.357
Title
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Description
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Cost Information
Time Estimate
Jun 01 2029

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.357
Title
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Description
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Cost Information
Time Estimate
Jun 01 2029
Cost Alloc Type
Contingent

System Reinforcement: b4000.352
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.352
Title
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.
Description
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.
Cost Information
Time Estimate
Sep 16 2030

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.352
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.352
Title
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.
Description
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point.
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.351
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.351
Title
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.
Description
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.
Cost Information
Time Estimate
Sep 16 2030

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.351
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.351
Title
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.
Description
Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken.
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.350
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.350
Title
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.
Description
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.
Cost Information
Time Estimate
Sep 16 2030

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.350
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.350
Title
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.
Description
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken.
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.344
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.344
Title
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.344
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.344
Title
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.346
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.346
Title
Cut-in 500kV line from Kraken substation into Yeat substation
Description
Cut-in 500kV line from Kraken substation into Yeat substation
Cost Information
Time Estimate
Jun 01 2029

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.346
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.346
Title
Cut-in 500kV line from Kraken substation into Yeat substation
Description
Cut-in 500kV line from Kraken substation into Yeat substation
Cost Information
Time Estimate
Jun 01 2029
Cost Alloc Type
Contingent

System Reinforcement: b4000.345
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.345
Title
Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.345
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.345
Title
Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.348
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.348
Title
Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.
Description
Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. A new redundant breaker ring will be added at Kraken to accommodate the new 500kV line from North Anna to Kraken.
Cost Information
Time Estimate
Jun 01 2029

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.348
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.348
Title
Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.
Description
Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. A new redundant breaker ring will be added at Kraken to accommodate the new 500kV line from North Anna to Kraken.
Cost Information
Time Estimate
Jun 01 2029
Cost Alloc Type
Contingent

System Reinforcement: b4000.349
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.349
Title
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.
Description
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.
Cost Information
Time Estimate
Sep 16 2030

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8POSSUM 500.0 kV Ckt 1 line (Any)
8LADYSMITH-8NO ANNA 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.349
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.349
Title
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.
Description
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken.
Cost Information
Time Estimate
Sep 16 2030
Cost Alloc Type
Contingent

System Reinforcement: b4000.325
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.325
Title
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Description
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Cost Information
Time Estimate
Feb 24 2029

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.325
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.325
Title
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Description
Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA.
Cost Information
Time Estimate
Feb 24 2029
Cost Alloc Type
Contingent

System Reinforcement: b4000.326
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.326
Title
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Description
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Cost Information
Time Estimate
Feb 24 2029

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.326
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.326
Title
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Description
At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith.
Cost Information
Time Estimate
Feb 24 2029
Cost Alloc Type
Contingent

System Reinforcement: b4000.327
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.327
Title
Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.
Description
Upgrade/install equipment at Ladysmith substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230kV strings of breaker and a half scheme.
Cost Information
Time Estimate
Feb 24 2029

ContingentTopology Changing

Note 1: Although AF1-125 may not presently have cost responsibility for this upgrade, AF1-125 may need this upgrade in-service to be deliverable to the PJM system. If AF1-125 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
8ELMONT-8LADYSMITH 500.0 kV Ckt 1 line (Any)
System Reinforcement: b4000.327
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.327
Title
Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme.
Description
Upgrade/install equipment at Ladysmith substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230kV strings of breaker and a half scheme.
Cost Information
Time Estimate
Feb 24 2029
Cost Alloc Type
Contingent

System Reinforcement: n9138.0

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9138.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9138.0 / TC1-PH1-DOM-070
Title
Wreck and rebuild 22.59 miles of Line #511 between Carson and Rawlings Substations with three (3) 1351 ACSS/TW and associated substation work.
Description
Wreck and rebuild 22.59 miles of Line 511 between Carson and Rawlings with three (3) 1351 ACSS/TW and associated substation work.
Total Cost ($USD)
$111,130,292
Allocated Cost ($USD)
$11,169,384
Time Estimate
60 to 61 Months
Cost Alloc Type
Cost Allocated
Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.5656 % $628,553
AE2-185 0.0346 % $38,451
AE2-187 0.0300 % $33,339
AE2-283 0.0305 % $33,895
AE2-291 0.5378 % $597,659
AF1-123 10.2087 % $11,344,958
AF1-124 10.2455 % $11,385,854
AF1-125 10.0507 % $11,169,372
AF1-294 0.4085 % $453,967
AF2-035 0.2624 % $291,606
AF2-042 28.1786 % $31,314,960
AF2-046 2.8849 % $3,205,998
AF2-115 0.2488 % $276,492
AF2-120 4.5021 % $5,003,197
AF2-222 3.8795 % $4,311,300
AF2-297 0.7165 % $796,249
AG1-008 2.8849 % $3,205,998
AG1-021 0.1990 % $221,149
AG1-082 0.1873 % $208,147
AG1-098 1.6029 % $1,781,307
AG1-105 0.6819 % $757,797
AG1-124 1.0619 % $1,180,093
AG1-135 4.4165 % $4,908,069
AG1-146 2.1236 % $2,359,963
AG1-147 4.9550 % $5,506,506
AG1-154 0.1382 % $153,582
AG1-166 0.1304 % $144,914
AG1-167 0.0978 % $108,685
AG1-168 0.0978 % $108,685
AG1-285 2.7978 % $3,109,203
AG1-342 0.0630 % $70,012
AG1-494 0.8172 % $908,157
AG1-536 4.9600 % $5,512,062

System Reinforcement: n9250.0

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9250.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9250.0 / TC1-PH2-DOM-044
Title
Construct a new 22.59 mile line between Carson and Rawlings Substations.
Description
Construct a new 22.59 mile line between Carson and Rawlings Substations.
Total Cost ($USD)
$108,728,086
Allocated Cost ($USD)
$10,927,946
Time Estimate
60 to 61 Months
Cost Alloc Type
Cost Allocated
Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.5656 % $614,966
AE2-185 0.0346 % $37,620
AE2-187 0.0300 % $32,618
AE2-283 0.0305 % $33,162
AE2-291 0.5378 % $584,740
AF1-123 10.2087 % $11,099,724
AF1-124 10.2455 % $11,139,736
AF1-125 10.0507 % $10,927,934
AF1-294 0.4085 % $444,154
AF2-035 0.2624 % $285,302
AF2-042 28.1786 % $30,638,052
AF2-046 2.8849 % $3,136,697
AF2-115 0.2488 % $270,515
AF2-120 4.5021 % $4,895,047
AF2-222 3.8795 % $4,218,106
AF2-297 0.7165 % $779,037
AG1-008 2.8849 % $3,136,697
AG1-021 0.1990 % $216,369
AG1-082 0.1873 % $203,648
AG1-098 1.6029 % $1,742,802
AG1-105 0.6819 % $741,417
AG1-124 1.0619 % $1,154,584
AG1-135 4.4165 % $4,801,976
AG1-146 2.1236 % $2,308,950
AG1-147 4.9550 % $5,387,477
AG1-154 0.1382 % $150,262
AG1-166 0.1304 % $141,781
AG1-167 0.0978 % $106,336
AG1-168 0.0978 % $106,336
AG1-285 2.7978 % $3,041,994
AG1-342 0.0630 % $68,499
AG1-494 0.8172 % $888,526
AG1-536 4.9600 % $5,392,913

System Reinforcement: n9630.0

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9630.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9630.0 / TC1-PH3-DOM-013
Title
Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers.
Description
n9630.0 addresses both stability and load flow violations. Construct a new 230 kV Line from the AG1-285 substation to the 230 kV Finneywood substation following the Line 1012 ROW for approximately 1.0 miles, then following the Line 556 ROW for approximately 3.5 miles to terminate at Finneywood. Expand the AG1-285 115 kV substation to accommodate two (2) new 115/230 kV transformers. Build a 230 kV substation at AG1-285 to connect the 115/230 kV transformers and the new 230 kV line to Finneywood. Expand the Finneywood 230 kV substation to accommodate the new line. The existing 1.0 miles of 115 kV from AG1-285 to Chase City does not need to be rebuilt to accommodate a new structure in the same right of way and therefore will be unchanged. The existing 3.5 miles of 500 kV towers from Structure 556/46 to Finneywood substation will need to be rebuilt as a double circuit tower to accommodate the new 230 kV line.
Total Cost ($USD)
$89,468,616
Allocated Cost ($USD)
$8,992,232
Time Estimate
Dec 31 2029
Cost Alloc Type
Cost Allocated
Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.5656 % $506,034
AE2-185 0.0346 % $30,956
AE2-187 0.0300 % $26,841
AE2-283 0.0305 % $27,288
AE2-291 0.5378 % $481,162
AF1-123 10.2087 % $9,133,583
AF1-124 10.2455 % $9,166,507
AF1-125 10.0507 % $8,992,222
AF1-294 0.4085 % $365,479
AF2-035 0.2624 % $234,766
AF2-042 28.1786 % $25,211,003
AF2-046 2.8849 % $2,581,080
AF2-115 0.2488 % $222,598
AF2-120 4.5021 % $4,027,967
AF2-222 3.8795 % $3,470,935
AF2-297 0.7165 % $641,043
AG1-008 2.8849 % $2,581,080
AG1-021 0.1990 % $178,043
AG1-082 0.1873 % $167,575
AG1-098 1.6029 % $1,434,092
AG1-105 0.6819 % $610,086
AG1-124 1.0619 % $950,067
AG1-135 4.4165 % $3,951,381
AG1-146 2.1236 % $1,899,956
AG1-147 4.9550 % $4,433,170
AG1-154 0.1382 % $123,646
AG1-166 0.1304 % $116,667
AG1-167 0.0978 % $87,500
AG1-168 0.0978 % $87,500
AG1-285 2.7978 % $2,503,153
AG1-342 0.0630 % $56,365
AG1-494 0.8172 % $731,138
AG1-536 4.9600 % $4,437,643

System Reinforcement: n9267.0

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9267.0
Type
Stability
TO
Dominion
RTEP ID / TO ID
n9267.0 / TC1-PH2-DOM-067
Title
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner.
Description
Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner substations with single (1) 768.2 ACSS/TW “Maumee” at 250 degrees C. This new line will be on separate transmission towers from the existing Northern Neck and Moon Corner line 1059. Station expansion is required at Northern Neck and Moon Corner to accommodate the new line.
Total Cost ($USD)
$45,730,074
Allocated Cost ($USD)
$4,596,198
Time Estimate
45 to 46 Months
Cost Alloc Type
Cost Allocated
Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.5656 % $258,649
AE2-185 0.0346 % $15,823
AE2-187 0.0300 % $13,719
AE2-283 0.0305 % $13,948
AE2-291 0.5378 % $245,936
AF1-123 10.2087 % $4,668,446
AF1-124 10.2455 % $4,685,275
AF1-125 10.0507 % $4,596,193
AF1-294 0.4085 % $186,807
AF2-035 0.2624 % $119,996
AF2-042 28.1786 % $12,886,095
AF2-046 2.8849 % $1,319,267
AF2-115 0.2488 % $113,776
AF2-120 4.5021 % $2,058,814
AF2-222 3.8795 % $1,774,098
AF2-297 0.7165 % $327,656
AG1-008 2.8849 % $1,319,267
AG1-021 0.1990 % $91,003
AG1-082 0.1873 % $85,652
AG1-098 1.6029 % $733,007
AG1-105 0.6819 % $311,833
AG1-124 1.0619 % $485,608
AG1-135 4.4165 % $2,019,669
AG1-146 2.1236 % $971,124
AG1-147 4.9550 % $2,265,925
AG1-154 0.1382 % $63,199
AG1-166 0.1304 % $59,632
AG1-167 0.0978 % $44,724
AG1-168 0.0978 % $44,724
AG1-285 2.7978 % $1,279,436
AG1-342 0.0630 % $28,810
AG1-494 0.8172 % $373,706
AG1-536 4.9600 % $2,268,212

System Reinforcement: n7541

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n7541
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n7541 / dom-016
Title
Add a third 224 MVA 230/115 kV transformer at Earleys Substation and supporting equipment.
Description
Add a third 224 MVA 230/115 kV transformer at Earleys Substation and supporting equipment.
Total Cost ($USD)
$22,779,395
Allocated Cost ($USD)
$2,289,491
Time Estimate
Dec 31 2029
Cost Alloc Type
Cost Allocated
Cost Allocation
Project Percent Allocation Allocated Cost ($USD)
AE1-148 0.5656 % $128,840
AE2-185 0.0346 % $7,882
AE2-187 0.0300 % $6,834
AE2-283 0.0305 % $6,948
AE2-291 0.5378 % $122,508
AF1-123 10.2087 % $2,325,480
AF1-124 10.2455 % $2,333,863
AF1-125 10.0507 % $2,289,489
AF1-294 0.4085 % $93,054
AF2-035 0.2624 % $59,773
AF2-042 28.1786 % $6,418,915
AF2-046 2.8849 % $657,163
AF2-115 0.2488 % $56,675
AF2-120 4.5021 % $1,025,551
AF2-222 3.8795 % $883,727
AF2-297 0.7165 % $163,214
AG1-008 2.8849 % $657,163
AG1-021 0.1990 % $45,331
AG1-082 0.1873 % $42,666
AG1-098 1.6029 % $365,131
AG1-105 0.6819 % $155,333
AG1-124 1.0619 % $241,894
AG1-135 4.4165 % $1,006,052
AG1-146 2.1236 % $483,743
AG1-147 4.9550 % $1,128,719
AG1-154 0.1382 % $31,481
AG1-166 0.1304 % $29,704
AG1-167 0.0978 % $22,278
AG1-168 0.0978 % $22,278
AG1-285 2.7978 % $637,322
AG1-342 0.0630 % $14,351
AG1-494 0.8172 % $186,153
AG1-536 4.9600 % $1,129,858

System Reinforcement: b4000.356

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.356
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.356
Title
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
Description
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.355

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.355
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.355
Title
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
Description
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.342

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.342
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.342
Title
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Description
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.341

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.341
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.341
Title
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.
Description
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV substation and extend approximately 0.2 miles of conductor to fly-over the site.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3689.2

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3689.2
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3689.2
Title
Replace 230 kV breakers SC102, H302, H402 and 218302 at Brambleton substation with 80 kA
Description
Replace 230 kV breakers SC102, H302, H402 and 218302 at Brambleton substation with 4000A 80 kA breakers and associated equipment including breaker leads as necessary to address breaker duty issues identified in short circuit analysis.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.103

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.103
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b4000.103
Title
Brambleton Sub 230kV - replace 63kA breakers 217202, 2172T2183, L102, L202 with 80kA
Description
Brambleton Sub 230kV - replace 63kA breakers 217202, 2172T2183, L102, L202 with 80kA
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.405

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.405
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3800.405
Title
Replace Brambleton 230 kV breakers 20102, 20602, 204502, 209402, 201T2045, 206T2094 with breakers rated 80 kA.
Description
Replace Brambleton 230 kV breakers 20102, 20602, 204502, 209402, 201T2045, 206T2094 with breakers rated 80 kA.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3854.1

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3854.1
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3854.1
Title
Replace over duty Carson 230kV circuit breakers 200272 and 24972-3 with an interrupting rating of 63 kA
Description
Replace over duty Carson 230kV circuit breakers 200272 and 24972-3 with an interrupting rating of 63 kA
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.108

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.108
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b4000.108
Title
Carson Sub 230kV - replace 40kA breaker 23872 with 63kA
Description
Carson Sub 230kV - replace 40kA breaker 23872 with 63kA
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.406

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.406
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3800.406
Title
Replace Gainesville 230 kV breaker 216192 with a breaker rated 80 kA.
Description
Replace Gainesville 230 kV breaker 216192 with a breaker rated 80 kA.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.115

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.115
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b4000.115
Title
Ladysmith Sub 500kV - replace 40kA breaker 574T581 with 63kA
Description
Ladysmith Sub 500kV - replace 40kA breaker 574T581 with 63kA
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.354

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.354
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b4000.354
Title
Ladysmith substation breakers replacement: 574T575 and 568T581
Description
Expand Ladysmith substation to a add redundant circuit breakers to the middle breakers on both 500kV strings (574T575 and 568T581). The equipment including switches 57518, 57515, H115 will be replaced with 5000A equipment.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3853.1

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3853.1
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3853.1 / (Pending)
Title
Replace over duty Ladysmith CT 230kV circuit breakers SX1272 and SX3472 with an interrupting rating of 63 kA
Description
Replace over duty Ladysmith CT 230kV circuit breakers SX1272 and SX3472 with an interrupting rating of 63 kA
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.114

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.114
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b4000.114
Title
Ladysmith S1 Sub 230kV - replace 40kA breakers 25672, 209072, 256T2090, GT172, GT272, GT372, GT472, GT572 with 63kA
Description
Ladysmith S1 Sub 230kV - replace 40kA breakers 25672, 209072, 256T2090, GT172, GT272, GT372, GT472, GT572 with 63kA
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.235

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.235
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3800.235
Title
Replace 5 overdutied 230kV breakers at Loudoun substation with 80kA breakers
Description
Replace 5 overdutied 230kV breakers at Loudoun substation with 80kA breakers: 212352, 2123T2173, 2030T2117, 211752, and 2008T2045
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.334

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.334
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3800.334
Title
Replace four (4) overdutied 230 kV breakers at Loudoun Substation with 80 kA breakers.
Description
Replace 4 overdutied 230kV breakers at Loudoun Substation with 80kA breakers: 2094T2140, 214052, 200852 and 203052.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.407

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.407
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3800.407
Title
Replace Loudoun 230 kV breakers 204552 and 217352 with breakers rated 80 kA.
Description
Replace Loudoun 230 kV breakers 204552, 217352 with breakers rated 80 kA.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.119

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.119
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b4000.119
Title
Loudoun Cap Substation 230kV - replace 50 kA breaker SC352 with 63 kA.
Description
Loudoun Cap Sub 230kV - replace 50kA breaker SC352 with 63kA
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.128

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.128
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b4000.128
Title
North Anna Substation 500 kV - replace 40 kA breakers 57502, G102-1, G102-2, G202, G2T575, and XT573 with 63 kA.
Description
North Anna Sub 500kV - replace 40kA breakers 57502, G102-1, G102-2, G202, G2T575, XT573 with 63kA
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.408

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.408
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3800.408
Title
Replace Ox 230 kV breakers 22042, 24342, 24842, 220T2063, 243T2097, 248T2013, and H342 with breakers rated 80 kA.
Description
Replace Ox 230 kV breakers 22042, 24342, 24842, 220T2063, 243T2097, 248T2013, H342 with breakers rated 80 kA.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: s2609.6

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: s2609.6
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
s2609.6
Title
Upgrade two (2) 230 kV breakers 201342 and L142 from 50 kA to 63 kA at Ox Substation due to an insufficient breaker duty rating with the expansion in place.
Description
Upgrade (2) 230 kV breakers 201342 & L142 from 50kA to 63kA at Ox Substation due to an insufficient breaker duty rating with the expansion in place.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: s2609.9

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: s2609.9
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
s2609.9
Title
Upgrade 230 kV Pleasant View breakers L3T203 and L3T2180 from 50 kA to 80 kA.
Description
Upgrade 230kV Pleasant View breakers L3T203 and L3T2180 from 50kA to 80kA.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b4000.134

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b4000.134
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b4000.134
Title
Remington Substation 230 kV - replace 40 kA and 50 kA breakers 211462, GT162, GT262, GT362, GT462, 2077T2086, 208662, H962, and H9T299 with 63 kA.
Description
Remington Sub 230kV - replace 40kA and 50kA breakers 211462, GT162, GT262, GT362, GT462, 2077T2086, 208662, H962, H9T299 with 63kA
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b1696

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b1696
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b1696
Title
Install a breaker and a half scheme with a minimum of eight 230 kV breakers for five existing lines at Idylwood 230 kV: 20212 and 20712
Description
Install a breaker and a half scheme with a minimum of eight 230 kV breakers for five existing lines at Idylwood 230 kV: 20212 and 20712
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.236

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.236
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3800.236
Title
Replace 2 overdutied 500kV breakers at Ox Substation with 63kA breakers.
Description
Replace 2 overdutied 500kV breakers at Ox Substation with 63kA breakers: H1T539 and H2T539
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: s3047.2

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: s3047.2
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
s3047.2
Title
Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation.
Description
Install (2) 1400 MVA 500-230 kV transformers and associated 500 kV and 230 kV equipment (breakers, switches, leads) at Vint Hill Substation to supply the area with a 500 kV source Cut and loop 500 kV line #535 Loudoun – Meadowbrook and #569 Loudoun - Morrisville as the 500 kV sources into the proposed 500 kV ring bus Vint Hill Substation will be expanded to the north of the existing site to accommodate the 500 kV ring required for the addition of the new transformers Existing terminations for 230 kV line #2174 Wheeler – Vint Hill, line #2101 Bristers – Vint Hill, and line #2163 Liberty – Vint Hill will be rearranged to terminate into the expanded Vint Hill Substation 230 kV line #2114 Remington CT – Rollins Ford will also be cut and looped into the expanded Vint Hill Substation due to spatial constraints along the existing right-of-way.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.312

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.312
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.312
Title
Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way.
Description
Rebuild 500kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way. New conductor to have a summer rating of 4357 MVA.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.313

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.313
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.313
Title
Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.
Description
Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.356

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.356
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.356
Title
Build a new 500 kV line from Vint Hill to Wishing Star.
Description
Build a new 500kV line from Vint Hill to Wishing Star. The line will be supported on single circuit monopoles. New conductor to have a summer rating of 4357 MVA. Line length is approximately 16.59 miles
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.357

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.357
Title
Build a new 500 kV line from Morrisville to Vint Hill.
Description
Build a new 500kV line from Morrisville to Vint Hill. New conductor to have a summer rating of 4357 MVA. Line length is approximately 19.71 miles.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.354

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.354
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b3800.354
Title
Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590.
Description
Install terminal equipment at Wishing Star substation to support a 5000A line to Vint Hill. Update relay settings for 500kV Lines #546 and #590.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: b3800.335

AF1-125 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3800.335
Type
Short Circuit
TO
Dominion
RTEP ID / TO ID
b3800.335
Title
Replace 1 overdutied 500kV breaker at Ox Substation with a 63kA breaker
Description
Replace 1 overdutied 500kV breaker at Ox Substation with a 63kA breaker: 56142
Cost Information
Cost Alloc Type
Contingent

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AF1-125


AF1-125 Contributions into Topology or Eliminated Reinforcements:
Type TO RTEP ID / TO ID Title Topo or Elim MW Impact Percent Allocation Category Allocated Cost ($USD)
Stability Dominion n8492 Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line. Topology 820.0 MW 32.9% Cost Allocated $10,793,612
Stability Dominion n9259.0 Install two 230 kV gas insulated switchgear ("GIS") bus ties for the Coastal Virginia Offshore Wind ("CVOW") project. Topology 820.0 MW 32.9% Cost Allocated $3,406,805
Stability Dominion n8492.1 Two Breaker Additions at Fentress Substation. Topology 820.0 MW 32.9% Cost Allocated $2,685,318
Stability Dominion n8492.2 Expand Yadkin Substation to accommodate the new 500 kV line. Topology 820.0 MW 32.9% Cost Allocated $2,181,969
Load Flow Dominion n9246.0 / TC1-PH2-DOM-040 Wreck and rebuild 18.75 miles of Line 594 btwn Morrisville and Spotsylvania with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA. Eliminated 39.3 MW 18.7% Cost Allocated $9,792,900
Load Flow Dominion n9247.0 / TC1-PH2-DOM-041 Wreck and rebuild 14.02 miles of Line 573 btwn Spotsylvania and North Anna with (3) 1351.5 ACSR (45/7) "Dipper" at 110 degrees C and assoc substation work to achieve new rating of 4356/4356/5009 MVA. Eliminated 40.3 MW 18.7% Cost Allocated $7,624,902
Load Flow Dominion n9263.0 / TC1-PH2-DOM-062 Wreck and Rebuild 14.83 miles of 230 kV line 256 with (2) 768.2 ACSS/TW (20/7) ""Maumee"" conductor @ 250 degrees C. Eliminated 20.4 MW 32.9% Cost Allocated $5,525,610
Load Flow Dominion n7568 / dom-369 Wreck and rebuild 6.47 miles of 230 kV transmission line 2028 between Charlottesville and Mt. Eagle with (2) 768.2 ACSS/TW (20/7) "Maumee" @ 250C and replace line lead at Mt. Eagle. Eliminated 34.5 MW 32.9% Cost Allocated $4,955,126
Load Flow Dominion n9203.0 / TC1-PH2-DOM-008 Wreck and rebuild 10.74 miles of line 2028 between Fork Union and Cunningham (Grape Vine) with (2) 768.2 ACSS/TW (20/7) "MAUMEE" @ 250C. Eliminated 34.5 MW 19.4% Cost Allocated $2,342,629
Load Flow Dominion n9644.0 / TC1-PH3-DOM-006 Upgrade a 2.73 mile segment of 230kV transmission line 2028 between Mt. Eagle and Grape Vine. This segment runs from Grape Vine substation to structure 2080/73. Eliminated 34.5 MW 32.9% Cost Allocated $1,133,070
Load Flow Dominion n7569 / dom-490 Upgrade a 3.78 mile segment of 230kV transmission line 2028 between Mt. Eagle and Grape Vine Substations at structure 2080/73. Eliminated 34.5 MW 19.4% Cost Allocated $1,059,517
Load Flow Dominion n6161 / dom-039 Replace 500 kV circuit breaker H1T561 at Clifton with a higher rated device (Clifton - Ox). Eliminated 96.0 MW 32.9% Cost Allocated $354,737
Load Flow Dominion n9198.0 / TC1-PH2-DOM-003 Replace Circuit Breaker 219322 and Circuit Breaker Lead at Bremo 230 kV (Bremo - Fork Union). Eliminated 67.4 MW 32.9% Cost Allocated $284,626
Load Flow Dominion n9262.0 / TC1-PH2-DOM-061 Replace wave trap 256WT at Four River 230 kV station (Four River - St. John). Eliminated 20.4 MW 32.9% Cost Allocated $69,271
Load Flow Dominion b4000.357 Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.352 Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.351 Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.350 Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.344 Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.346 Cut-in 500kV line from Kraken substation into Yeat substation Topology - 0.0% Contingent $0
Load Flow Dominion b4000.345 Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.348 Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.349 Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.325 Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.326 At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith. Topology - 0.0% Contingent $0
Load Flow Dominion b4000.327 Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme. Topology - 0.0% Contingent $0
Contributions into Topology or Eliminated Reinforcement Total: $52,210,092
AF1-125 Contingent Region Topology Upgrades:
TO RTEP ID Title Category Allocated Cost ($USD)
Dominion n9138.0 Wreck and rebuild 22.59 miles of Line #511 between Carson and Rawlings Substations with three (3) 1351 ACSS/TW and associated substation work. Cost Allocated $11,169,384
Dominion n9250.0 Construct a new 22.59 mile line between Carson and Rawlings Substations. Cost Allocated $10,927,946
Dominion n9630.0 Construct a new 230 kV line from the AG1-285 substation to the Finneywood 230 kV Substation. Expand AG1-285 substation and add two (2) new 230/115 kV transformers. Cost Allocated $8,992,232
Dominion n8492 Wreck and rebuild the existing Yadkin to Fentress 500 kV Line #588 to share the right of way with the new Yadkin to Fentress #5005 line. Cost Allocated $8,057,884
Dominion n9267.0 Construct new 10.21 mile 115 kV line between Northern Neck and Moon Corner. Cost Allocated $4,596,198
Dominion n9259.0 Install two 230 kV gas insulated switchgear ("GIS") bus ties for the Coastal Virginia Offshore Wind ("CVOW") project. Cost Allocated $2,543,323
Dominion n7541 Add a third 224 MVA 230/115 kV transformer at Earleys Substation and supporting equipment. Cost Allocated $2,289,491
Dominion n8492.1 Two Breaker Additions at Fentress Substation. Cost Allocated $2,004,703
Dominion n8492.2 Expand Yadkin Substation to accommodate the new 500 kV line. Cost Allocated $1,628,931
Dominion b4000.357 Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat. Contingent $0
Dominion b4000.356 Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section). Contingent $0
Dominion b4000.355 Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section). Contingent $0
Dominion b4000.352 Cut in Line #568 Ladysmith - Possum Point into Kraken, creating new Line #568 Kraken to Possum Point. Contingent $0
Dominion b4000.351 Cut in Line #568 Ladysmith - Possum Point into Kraken, creating Line #9517 Ladysmith to Kraken. Contingent $0
Dominion b4000.350 Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Kraken. Contingent $0
Dominion b4000.349 Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Kraken. Contingent $0
Dominion b4000.348 Build a new 500/230kV substation called Kraken. The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. Contingent $0
Dominion b4000.346 Cut-in 500kV line from Kraken substation into Yeat substation Contingent $0
Dominion b4000.345 Build a 500kV line from a new substation called Kraken to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA. Contingent $0
Dominion b4000.344 Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Kraken. New conductor to have a minimum summer normal rating of 4357MVA. Contingent $0
Dominion b4000.342 Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill. Contingent $0
Dominion b4000.341 Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site. Contingent $0
Dominion b4000.325 Build a new 26.38mi 230kV Line from Elmont – Ladysmith on the existing 5-2 structures between the two stations. New conductor has a summer rating of 1573 MVA. Contingent $0
Dominion b3689.2 Replace 230 kV breakers SC102, H302, H402 and 218302 at Brambleton substation with 80 kA Contingent $0
Dominion b4000.103 Brambleton Sub 230kV - replace 63kA breakers 217202, 2172T2183, L102, L202 with 80kA Contingent $0
Dominion b3800.405 Replace Brambleton 230 kV breakers 20102, 20602, 204502, 209402, 201T2045, 206T2094 with breakers rated 80 kA. Contingent $0
Dominion b3854.1 Replace over duty Carson 230kV circuit breakers 200272 and 24972-3 with an interrupting rating of 63 kA Contingent $0
Dominion b4000.108 Carson Sub 230kV - replace 40kA breaker 23872 with 63kA Contingent $0
Dominion b4000.326 At Elmont substation, install/upgrade associated equipment to accommodate a 4000A line rating for the new 230kV line between Elmont - Ladysmith. Contingent $0
Dominion b4000.327 Upgrade/install equipment at Ladysmith Substation to 4000A. Expansion will be required to accommodate a total of three (3) new 230 kV strings of breaker and a half scheme. Contingent $0
Dominion b3800.406 Replace Gainesville 230 kV breaker 216192 with a breaker rated 80 kA. Contingent $0
Dominion b4000.115 Ladysmith Sub 500kV - replace 40kA breaker 574T581 with 63kA Contingent $0
Dominion b4000.354 Ladysmith substation breakers replacement: 574T575 and 568T581 Contingent $0
Dominion b3853.1 Replace over duty Ladysmith CT 230kV circuit breakers SX1272 and SX3472 with an interrupting rating of 63 kA Contingent $0
Dominion b4000.114 Ladysmith S1 Sub 230kV - replace 40kA breakers 25672, 209072, 256T2090, GT172, GT272, GT372, GT472, GT572 with 63kA Contingent $0
Dominion b3800.235 Replace 5 overdutied 230kV breakers at Loudoun substation with 80kA breakers Contingent $0
Dominion b3800.334 Replace four (4) overdutied 230 kV breakers at Loudoun Substation with 80 kA breakers. Contingent $0
Dominion b3800.407 Replace Loudoun 230 kV breakers 204552 and 217352 with breakers rated 80 kA. Contingent $0
Dominion b4000.119 Loudoun Cap Substation 230kV - replace 50 kA breaker SC352 with 63 kA. Contingent $0
Dominion b4000.128 North Anna Substation 500 kV - replace 40 kA breakers 57502, G102-1, G102-2, G202, G2T575, and XT573 with 63 kA. Contingent $0
Dominion b3800.408 Replace Ox 230 kV breakers 22042, 24342, 24842, 220T2063, 243T2097, 248T2013, and H342 with breakers rated 80 kA. Contingent $0
Dominion s2609.6 Upgrade two (2) 230 kV breakers 201342 and L142 from 50 kA to 63 kA at Ox Substation due to an insufficient breaker duty rating with the expansion in place. Contingent $0
Dominion s2609.9 Upgrade 230 kV Pleasant View breakers L3T203 and L3T2180 from 50 kA to 80 kA. Contingent $0
Dominion b4000.134 Remington Substation 230 kV - replace 40 kA and 50 kA breakers 211462, GT162, GT262, GT362, GT462, 2077T2086, 208662, H962, and H9T299 with 63 kA. Contingent $0
Dominion b1696 Install a breaker and a half scheme with a minimum of eight 230 kV breakers for five existing lines at Idylwood 230 kV: 20212 and 20712 Contingent $0
Dominion b3800.236 Replace 2 overdutied 500kV breakers at Ox Substation with 63kA breakers. Contingent $0
Dominion s3047.2 Install two (2) 1400 MVA 500-230 kV transformers at Vint Hill Substation and loop 500 kV line #535 and #569 into the proposed 500 kV ring bus at Vint Hill Substation. Contingent $0
Dominion b3800.312 Rebuild 500 kV Line #569 Loudoun - Morrisville to accommodate the new 500 kV line in the existing right-of-way. Contingent $0
Dominion b3800.313 Rebuild approximately 10.29 miles line segment of Line #535 (Meadow Brook to Loudoun) to accommodate the new 500 kV line in the existing ROW. Contingent $0
Dominion b3800.356 Build a new 500 kV line from Vint Hill to Wishing Star. Contingent $0
Dominion b3800.357 Build a new 500 kV line from Morrisville to Vint Hill. Contingent $0
Dominion b3800.354 Install terminal equipment at Wishing Star Substation to support a 5000A line to Vint Hill. Update relay settings for 500 kV Lines #546 and #590. Contingent $0
Dominion b3800.335 Replace 1 overdutied 500kV breaker at Ox Substation with a 63kA breaker Contingent $0
Region Topology Upgrade Total: $52,210,092

Attachments

AF1-125 One Line Diagram

AF1-125 One Line Diagram.pdf

[1]Winter load flow analysis will be performed starting in Transition Cycle 2.