AG1-118 Phase III Study Report

v1.00 released 2025-09-18 16:55

Sugar Grove-Waterman 138kV

180.0 MW Capacity / 300.0 MW Energy

Introduction

This Phase III System Impact Study Report (PH3) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 312 for New Service Requests (projects) in Transition Cycle 1. The Project Developer/Eligible Customer (developer) is Leeward Renewable Energy Development, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Commonwealth Edison Company.

Preface

New Service Requests meeting the requirements of Tariff, Part VII, Subpart D, Decision Point II, were included in the Phase III System Impact Study. The Phase III System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase III System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.7, PJM takes the following actions during the Phase III System Impact Study:
  1. PJM will retool load flow, short circuit and stability results based on decisions made by Project Developers or Eligible Customers during Decision Point II.
  2. PJM will coordinate with Affected System Operators to conduct any studies required to determine the final impact of a New Service Request on any Affected System and will include the final Affected System Study results in the Phase III System Impact Study, if available from the Affected System.
  3. The Phase III System Impact Study Results will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  4. PJM will tender draft final agreements to Project Developers or Eligible Customers.
The Transmission Owner takes the following actions during the Phase III System Impact Study:
  1. Verify Interconnection Facilities and Network Upgrades required to accommodate the New Service Request.
  2. Perform a Facilities Study. The Facilities Study in Phase III System Impact Study phase will be for the System Reliability Network Upgrades. The Facilities Study requirements are outlined in Attachment C of PJM Manual 14H. The study will be conducted pursuant to Tariff, Part VII, Subpart D, section 307(A)(7).

Decision Point III Requirements

At the close of Phase III System Impact Study, PJM will initiate Decision Point III (DP3). During DP3, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 313.A. Additional information on these elements is available in PJM Manual 14H sections 4.8, 6, and 7.

As stated in PJM Tariff, Part VII, Subpart D, section 313.C, New Service Requests may not be changed or modified in any way for any reason during Decision Point III. A New Service Request must be withdrawn and resubmitted in a subsequent Cycle to the extent a Project Developer or Eligible Customer wants to make any changes to such New Service Request at this point in the Cycle process.

Adverse Test Eligibility

This New Service Request does not meet the Adverse Study Impact Criteria and has the option to either move forward in the Cycle process or withdraw at DP3 with cumulative Readiness Deposits forfeited. See adverse study impact calculation below.

This section details whether a Project Developer or Eligible Customer qualifies for the Adverse Study Impact clause outlined in the PJM OATT, Part VII, Subpart D, section 313.B and Manual 14H, section 6.2.2. In order to qualify for an Adverse Study Impact at Decision Point III, the Network Upgrade cost from Phase II to Phase III must:

  1. Increase overall by 35% or more
  2. Increases by more than $25,000 per MW (Includes Costs identified in Affected System studies)

If a New Service Request meets the criteria above and chooses to withdraw the request, PJM will refund the cumulative Readiness Deposit amounts paid at the Application Phase, Decision Point I, and Decision Point II (RD1, and RD2 and RD3, respectively).

The below calculations show the computation of this New Service Request's Adverse Study Impact

DP3 Adverse Eligibility = DP3 Adverse Cost Alloc DP2 Adverse Cost Alloc > 1.35 AND ( DP3 Adverse Cost Alloc - DP2 Adverse Cost Alloc ) Project Size > $25,000 per MW
DP3 Adverse Eligibility = $18,737,982 $39,575,140 = 0.47 AND ( $18,737,982 - $39,575,140 ) 300.0 = $-69,457 per MW

General

The Project Developer has proposed a Solar generating facility located in the Commonwealth Edison Company zone — DeKalb County, Illinois. The installed facilities will have a total capability of 300.0 MW with 180.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG1-118
Project Name:
Sugar Grove-Waterman 138kV
Project Developer Name:
Leeward Renewable Energy Development, LLC
State:
Illinois
County:
DeKalb
Transmission Owner:
Commonwealth Edison Company
MFO:
300.0
MWE:
300.0
MWC:
180.0
Fuel Type:
Solar
Basecase Study Year:
2027

Physical Interconnection Facility Study

Report Available

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AG1-118 will interconnect on the ComEd transmission system via a newly constructed 138kV breaker-and-a-half substation, TSS 956 Rimsnider Road, tapping the TSS 113 Waterman - TDC 569 Sugar Grove 138kV line, L.11106, approximately 3.3 miles from TSS 113 Waterman and 14.5 miles from TDC 569 Sugar Grove.

 

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In Phase III SIS, the interconnected Transmission Owner has performed a facilities study for the required System Reliability Network Upgrades. The Facilities Studies for the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades were performed by the Transmission Owner in Phase II and are available for download on PJM.com (see General Section for document links).

Based on the Phase III SIS results, the AG1-118 project has the following allocation of costs for interconnection. The Security amount required at DP3 is also shown below.

Cost Summary
Description Cost Allocated to AG1-118 Cost Subject to Security
Transmission Owner Interconnection Facilities (TOIF) $0 $0
Other Scope $0 $0
Option to Build Oversight $1,810,470 $1,810,470
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades $0 $0
Network Upgrades $8,216,337 $8,216,337
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL) $9,409,866 $9,409,866
Transient Stability $0 $0
Short Circuit $0 $0
Transmission Owner Analysis
SubRegional $0 $0
Distribution $0 $0
Affected System Study Reinforcements
AFS - PJM Violatons $0 $0
AFS - Non-PJM Violations $1,111,779 $0
Total $20,548,452 $19,436,673

* Contributes to calculation for Security. See Security Section of this report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Security Requirement

Per Tariff Part VII, Subpart D, section 313 (Decision Point III) A.1.a and PJM Manual 14H, section 8.6.1, Project Developers and Eligible Customers are required to provide Security in a form acceptable to PJM at Decision Point III which runs concurrently with the projects' Final Agreement Negotiation Phase. Security may be in the form of cash, letter of credit, or other form of Security acceptable to PJM (see PJM M14H, Section 6.4).

Security is calculated for a New Service Request based on the Network Upgrade costs allocated pursuant to the Phase III System Impact Study results.

Note 1: "Network Upgrades" referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Security Due for AG1-118

Security has been calculated for the AG1-118 project(s) based on the Phase III System Impact Study results and is shown in the table below. This Security must be provided at Decision Point III through either a wire transfer or letter of credit or other form of Security deemed acceptable by PJM per Manual 14H, Section 6.4.

Security Due for AG1-118
Project(s): AG1-118
Final Agreement Security (A): $19,436,673
Portion of Costs Already Paid (B): $0
Net Security Due at DP3: A B = $19,436,673
Note: Failure to provide an acceptable form of Security by the end of Decision Point III will result in withdrawal and termination of the New Service Request.

Transmission Owner Scope of Work

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Project Developer has elected the option Option to Build where they will assume responsibility for the design, procurement and construction of the Transmission Owner Interconnection Facilities and/or Stand-Alone Network Upgrades identified in this Phase III SIS report.

The Project Developer must fulfill additional requirements in accordance to PJM Manual 14C, section 5.1 and PJM Manual 14H, section 8.6.2.

The cost estimates for eligible facilities and Option to Build oversight are highlighted below:

Network Upgrades
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
n9456.0

Cut existing L11106 138 kV transmission line between existing structures 245 and 246 to loop into the new TSS 956 Rimsnider Road Substation and break into new L95602.

$1,856,087 $486,400 $660,785 $28,997 $3,032,269 $3,032,269
n9455.0

Perform relay and communication upgrades at TSS 113 Waterman 138 kV.

$246,527 $67,369 $87,766 $4,016 $405,678 $405,678
n9454.0

Perform relay and communication upgrades at TDC 569 Sugar Grove 138 kV.

$244,069 $67,369 $86,891 $4,016 $402,345 $402,345
n9453.0

Extend distribution power to tie in the auxiliary power for the new interconnection substation.

$767,832 $492,027 $273,356 $29,333 $1,562,548 $1,562,548
n9452.0

Install fiber from TSS 956 Rimsnider Rd to TSS 113 Waterman.

$1,400,747 $356,720 $498,680 $21,266 $2,277,413 $2,277,413
n9660.0

Perform relay upgrades at TSS 56 North Aurora substation.

$157,155 $6,150 $104,370 $367 $268,042 $268,042
n9659.0

Perform relay upgrades at TSS 189 Crego Rd substation.

$157,155 $6,150 $104,370 $367 $268,042 $268,042
Option to Build Oversight
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
(Pending)

Provide oversight for the constuction of the new TSS 956 substation.

$1,275,346 $0 $454,035 $0 $1,729,381 $1,729,381
(Pending)

Provide oversight for the construction of the Transmision Owner Interconnection Facilities from the Point of Change in Ownership to the new TSS 956 substation.

$59,800 $0 $21,289 $0 $81,089 $81,089

Based on the scope of work for the Interconnection Facilities, it is expected to take 60 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase 2 of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Notes on Cost Estimate:

  1. These estimates are Order-of-Magnitude estimates of the costs that ComEd would bill to the Project Developer for this interconnection. These estimates are based on a one-line electrical diagram of the project and the information provided by the Project Developer.
  2. These estimates are not a guarantee of the maximum amount payable by the Project Developer and the actual costs of ComEd's work may differ significantly from these estimates. The Project Developer will be responsible for paying actual costs of ComEd's work in accordance with the PJM Open Access Transmission Tariff.
  3. The Project Developer is responsible for all engineering, procurement, testing and construction of all equipment on the Project Developer’s side of the Point of Change in Ownership.

These cost estimates do not include cost of acquiring right-of-way for the transmission line and purchasing any additional land, if needed, for the line terminations.

Transmission Owner Analysis

 No Transmission Owner impacts identified.

 

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. ComEd interconnection requirements can be found here. Refer to AG1-118 Physical Interconnection Facilities Study for additional requirements found in the General Section of the report.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards and in the Physical Interconnection Facilities Study.

Summer Peak Analysis

The New Service Request was evaluated as a 300.0 MW (180.0 MW Capacity) injection in the ComEd area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential summer peak period network impacts were as follows:

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
CE AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
934720 to 270926 ckt 1
COMED_P4_023-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT3-4___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Breaker AC 101.82 % 2107.0 STE 2145.27 21.7
CE AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
934720 to 270926 ckt 1
COMED_P4_023-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
END
Breaker AC 101.64 % 2107.0 STE 2141.61 21.7
CE AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
934720 to 270926 ckt 1
COMED_P4_023-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT4-5___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Breaker AC 101.58 % 2107.0 STE 2140.27 21.7
AEP/AMIL J1180 POI-05SULLIVAN 345.0 kV Ckt 1 line
956820 to 247712 ckt 1
AEP_P4_#3128_05EUGENE 345_A2_SRT-A
CONTINGENCY 'AEP_P4_#3128_05EUGENE 345_A2_SRT-A'
 OPEN BRANCH FROM BUS 243221 TO BUS 249504 CKT 1   /*05EUGENE     345.0 - 08CAYSUB     345.0
 OPEN BRANCH FROM BUS 243221 TO BUS 348885 CKT 1   /*05EUGENE     345.0 - 7BUNSONVILLE 345.0
END
Breaker AC 108.18 % 1635.0 B 1768.74 18.26
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_111-45-L11126__SRT-A
CONTINGENCY 'COMED_P4_111-45-L11126__SRT-A'
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270846 CKT 1                /*ELECT JCT; B 345.0 - PLANO    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270916 CKT 1                /*ELECT JCT; B 345.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270928 CKT 1                /*ELECT JCT; B 345.0 - WOLFS    ; B 345.0
 TRIP BRANCH FROM BUS 270916 TO BUS 270917 CKT 1                /*WAYNE    ; B 345.0 - WAYNE    ; R 345.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Breaker AC 101.9 % 1568.0 STE 1597.86 49.02
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4_111-45-L16704T_SRT-A
CONTINGENCY 'COMED_P4_111-45-L16704T_SRT-A'
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270916 CKT 1                /*ELECT JCT; B 345.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270928 CKT 1                /*ELECT JCT; B 345.0 - WOLFS    ; B 345.0
 TRIP BRANCH FROM BUS 270846 TO BUS 270730 CKT 1                /*PLANO    ; B 345.0 - ELECT JCT; B 345.0
 TRIP BRANCH FROM BUS 270846 TO BUS 272278 TO BUS 275354 CKT 1  /*PLANO    ; B 345.0 - PLANO;1I     138.0 - PLANO;1C      34.5
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
 TRIP BRANCH FROM BUS 272250 TO BUS 272278 CKT 2                /*PLANO    ; B 138.0 - PLANO;1I     138.0
 TRIP BRANCH FROM BUS 272250 TO BUS 272278 CKT Z1               /*PLANO    ; B 138.0 - PLANO;1I     138.0
END
Breaker AC 101.7 % 1568.0 STE 1594.72 55.5
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P4-6_111-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-R______SRT-A'
 DISCONNECT BUS 270731   /*ELECT JCT;4R 345.0
 DISCONNECT BUS 270733   /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183   /*ELECT JCT;3M 138.0
 DISCONNECT BUS 275184   /*ELECT JCT;4M 138.0
END
Breaker AC 100.69 % 1568.0 STE 1578.74 38.16
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
COMED_P2-2_111_EJ-345B__2_SRT-A
CONTINGENCY 'COMED_P2-2_111_EJ-345B__2_SRT-A'
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270846 CKT 1                /*ELECT JCT; B 345.0 - PLANO    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270916 CKT 1                /*ELECT JCT; B 345.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270928 CKT 1                /*ELECT JCT; B 345.0 - WOLFS    ; B 345.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Bus AC 100.26 % 1568.0 STE 1572.01 48.49
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Single AC 104.81 % 1568.0 STE 1643.5 12.33
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Single AC 104.81 % 1568.0 STE 1643.5 12.33
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Base Case Single AC 100.3 % 1201.0 A 1204.62 18.65

Details for AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line l/o COMED_P4_023-65-BT3-4___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
934720 to 270926 ckt 1
Contingency Name:
COMED_P4_023-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT3-4___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.82 %
Rating: 2107.0 MVA
Rating Type: STE
MVA to Mitigate: 2145.27 MVA
MW Contribution: 21.7 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
934720 to 270926 ckt 1
Contingency Name:
COMED_P4_023-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT3-4___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 102.9 %
Rating: 2107.0 MVA
Rating Type: STE
MVA to Mitigate: 2168.19 MVA
MW Contribution: 22.09 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.55 MW 1.32 MW
962012 AG1-044 E Adder 0.04 MW 0.03 MW
962781 AG1-127 C Adder 4.11 MW 3.5 MW
962782 AG1-127 E Adder 2.74 MW 2.33 MW
965091 AG1-374 C 50/50 23.87 MW 23.87 MW
965092 AG1-374 E 50/50 15.91 MW 15.91 MW
965911 AG1-460 C Adder 0.91 MW 0.77 MW
965912 AG1-460 E Adder 1.36 MW 1.16 MW
966091 AG1-478 C 50/50 1.6 MW 1.6 MW
966092 AG1-478 E 50/50 0.4 MW 0.4 MW
966441 AG1-513 C Adder 0.29 MW 0.25 MW
966442 AG1-513 E Adder 0.43 MW 0.37 MW
290051 GSG-6; E Adder 6.18 MW 5.25 MW
290261 S-027 E 50/50 21.64 MW 21.64 MW
290265 S-028 E 50/50 21.51 MW 21.51 MW
295109 WESTBROOK E Adder 3.31 MW 2.81 MW
295111 SUBLETTE E Adder 1.61 MW 1.37 MW
933911 AD1-013 C Adder 1.09 MW 0.93 MW
933912 AD1-013 E Adder 1.74 MW 1.48 MW
934721 AD1-100 C 50/50 7.02 MW 7.02 MW
934722 AD1-100 E 50/50 213.35 MW 213.35 MW
936771 AD2-100 C Adder 9.2 MW 7.82 MW
936772 AD2-100 E Adder 6.14 MW 5.21 MW
936971 AD2-131 C Adder 0.61 MW 0.52 MW
936972 AD2-131 E Adder 3.05 MW 2.59 MW
937002 AD2-134 E Adder 5.97 MW 5.08 MW
942111 AE2-223 C 50/50 2.75 MW 2.75 MW
942112 AE2-223 E 50/50 18.43 MW 18.43 MW
942481 AE2-261 C Adder 13.54 MW 11.51 MW
942482 AE2-261 E Adder 9.03 MW 7.67 MW
959081 AF2-199 C Adder 4.07 MW 3.46 MW
959082 AF2-199 E Adder 2.03 MW 1.73 MW
959341 AF2-225 C 50/50 8.9 MW 8.9 MW
959342 AF2-225 E 50/50 12.29 MW 12.29 MW
959611 AF2-252 C 50/50 2.65 MW 2.65 MW
959612 AF2-252 E 50/50 3.98 MW 3.98 MW
960611 AF2-352 C 50/50 2.65 MW 2.65 MW
960612 AF2-352 E 50/50 3.98 MW 3.98 MW
960751 AF2-366 C Adder 4.1 MW 3.48 MW
960752 AF2-366 E Adder 2.73 MW 2.32 MW
274654 BRAIDWOOD;1U 50/50 40.85 MW 40.85 MW
274655 BRAIDWOOD;2U 50/50 39.59 MW 39.59 MW
274660 LASCO STA;1U 50/50 30.96 MW 30.96 MW
274661 LASCO STA;2U 50/50 31.06 MW 31.06 MW
274847 GR RIDGE ;BU 50/50 0.65 MW 0.65 MW
274853 TWINGROVE;U1 50/50 0.75 MW 0.75 MW
274854 TWINGROVE;U2 50/50 0.78 MW 0.78 MW
274863 CAYUGA RI;1U 50/50 0.78 MW 0.78 MW
274864 CAYUGA RI;2U 50/50 0.78 MW 0.78 MW
274871 GR RIDGE ;2U 50/50 0.24 MW 0.24 MW
274887 PILOT HIL;1U 50/50 0.91 MW 0.91 MW
274888 KELLY CRK;1U 50/50 0.91 MW 0.91 MW
276173 Z2-081 50/50 0.2 MW 0.2 MW
276591 L-013 2 Adder 2.04 MW 1.74 MW
276615 W2-048 GEN Adder 4.77 MW 4.06 MW
276621 X2-022 GEN Adder 16.33 MW 13.88 MW
293061 N-015 E 50/50 17.44 MW 17.44 MW
293715 O-029 E Adder 5.91 MW 5.02 MW
293716 O-029 E Adder 3.24 MW 2.75 MW
293717 O-029 E Adder 2.98 MW 2.53 MW
293771 O-035 E Adder 4.89 MW 4.16 MW
294392 P-010 E 50/50 22.15 MW 22.15 MW
294401 BSHIL;1U E Adder 5.84 MW 4.96 MW
294410 BSHIL;2U E Adder 5.84 MW 4.96 MW
917502 Z2-087 E 50/50 24.58 MW 24.58 MW
925582 AC1-033 E Adder 6.4 MW 5.44 MW
933411 AC2-154 C 50/50 3.01 MW 3.01 MW
933412 AC2-154 E 50/50 4.91 MW 4.91 MW
957381 AF2-032 C Adder 1.04 MW 0.88 MW
957382 AF2-032 E Adder 0.49 MW 0.41 MW
957471 AF2-041 C Adder 12.21 MW 10.38 MW
957472 AF2-041 E Adder 6.1 MW 5.19 MW
274674 JOLIET 9 ;6U Adder 21.02 MW 17.87 MW
274890 CAYUG;1U E 50/50 25.38 MW 25.38 MW
274891 CAYUG;2U E 50/50 25.38 MW 25.38 MW
925772 AC1-053 E Adder 16.24 MW 13.8 MW
934101 AD2-000 1 Adder 3.35 MW 2.85 MW
270681 BRIGHTSTK; R 50/50 0.6 MW 0.6 MW
275149 KELLYCK ;1E 50/50 22.18 MW 22.18 MW
276174 W4-005 E Adder 25.69 MW 21.83 MW
276655 AB2-047 C1 50/50 0.38 MW 0.38 MW
276656 AB2-047 C2 50/50 0.38 MW 0.38 MW
293516 O-009 E Adder 11.43 MW 9.71 MW
293519 PILOT HIL;1E 50/50 22.18 MW 22.18 MW
916212 CRESCENT ;1U Adder 3.44 MW 2.92 MW
924048 AB2-047 E1 50/50 15.24 MW 15.24 MW
924049 AB2-047 E2 50/50 15.48 MW 15.48 MW
927208 AC1-214 E1 Adder 2.32 MW 1.97 MW
927209 AC1-214 E2 Adder 2.32 MW 1.97 MW
957751 AF2-069 C Adder 0.15 MW 0.13 MW
957752 AF2-069 E Adder 0.49 MW 0.42 MW
990901 L-005 E Adder 8.68 MW 7.38 MW
290108 LEEDK;1U E Adder 14.23 MW 12.1 MW
916221 Z1-073 E Adder 4.35 MW 3.7 MW
924266 AB2-070 E Adder 15.07 MW 12.81 MW
926821 AC1-168 C Adder 0.92 MW 0.78 MW
926822 AC1-168 E Adder 6.17 MW 5.25 MW
934051 AD1-031 C Adder 1.94 MW 1.65 MW
934052 AD1-031 E Adder 3.16 MW 2.69 MW
936371 AD2-047 C 50/50 5.39 MW 5.39 MW
936372 AD2-047 E 50/50 26.3 MW 26.3 MW
936461 AD2-060 C 50/50 3.17 MW 3.17 MW
936511 AD2-066 C Adder 5.46 MW 4.64 MW
936512 AD2-066 E Adder 3.64 MW 3.1 MW
943121 AE2-341 C Adder 8.18 MW 6.95 MW
943122 AE2-341 E Adder 4.02 MW 3.41 MW
943591 AF1-030 C Adder 5.44 MW 4.62 MW
943592 AF1-030 E Adder 2.69 MW 2.29 MW
959091 AF2-200 C Adder 8.14 MW 6.92 MW
959092 AF2-200 E Adder 5.43 MW 4.61 MW
960141 AF2-305_AG1- Adder 0.88 MW 0.75 MW
960591 AF2-350 C 50/50 9.5 MW 9.5 MW
960592 AF2-350 E 50/50 6.34 MW 6.34 MW
930481 AB1-089 C Adder 1.47 MW 1.25 MW
939351 AE1-166 C 50/50 23.77 MW 23.77 MW
939352 AE1-166 E 50/50 21.94 MW 21.94 MW
939401 AE1-172 C 50/50 10.83 MW 10.83 MW
939402 AE1-172 E 50/50 50.69 MW 50.69 MW
939741 AE1-205 C 50/50 11.86 MW 11.86 MW
939742 AE1-205 E 50/50 16.38 MW 16.38 MW
946671 AF1-331 C Adder 1.41 MW 1.2 MW
962691 AG1-118 C Adder 13.02 MW 11.07 MW
962692 AG1-118 E Adder 8.68 MW 7.38 MW
963831 AG1-236 C Adder 2.18 MW 1.86 MW
963832 AG1-236 E Adder 14.61 MW 12.42 MW
941551 AE2-152 C 50/50 27.43 MW 27.43 MW
941552 AE2-152 E 50/50 18.29 MW 18.29 MW
941731 AE2-173 C 50/50 7.06 MW 7.06 MW
944221 AF1-090 C Adder 2.32 MW 1.97 MW
944222 AF1-090 E Adder 10.86 MW 9.23 MW
958011 AF2-095 C 50/50 13.69 MW 13.69 MW
958012 AF2-095 E 50/50 9.12 MW 9.12 MW
276626 AG1-044 E Adder 0.04 MW 0.04 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 46.52 MW 46.52 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 14.13 MW 14.13 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.33 MW 1.33 MW
NY PJM->LTFIMP_NY CLTF 0.72 MW 0.72 MW
WEC LTFEXP_WEC->PJM CLTF 1.96 MW 1.96 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.26 MW 0.26 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.13 MW 0.13 MW
TVA LTFEXP_TVA->PJM CLTF 1.43 MW 1.43 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.25 MW 0.25 MW
MEC LTFEXP_MEC->PJM CLTF 8.17 MW 8.17 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.67 MW 0.67 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.97 MW 2.97 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 8.56 MW 8.56 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.41 MW 0.41 MW

Details for AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line l/o COMED_P4_023-65-BT2-3___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
934720 to 270926 ckt 1
Contingency Name:
COMED_P4_023-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.64 %
Rating: 2107.0 MVA
Rating Type: STE
MVA to Mitigate: 2141.61 MVA
MW Contribution: 21.7 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
934720 to 270926 ckt 1
Contingency Name:
COMED_P4_023-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270607 TO BUS 270630 CKT 1   /*COLLINS  ;   765.0 - PLANO    ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 102.72 %
Rating: 2107.0 MVA
Rating Type: STE
MVA to Mitigate: 2164.39 MVA
MW Contribution: 22.09 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.55 MW 1.32 MW
962012 AG1-044 E Adder 0.04 MW 0.03 MW
962781 AG1-127 C Adder 4.11 MW 3.5 MW
962782 AG1-127 E Adder 2.74 MW 2.33 MW
965091 AG1-374 C 50/50 23.87 MW 23.87 MW
965092 AG1-374 E 50/50 15.91 MW 15.91 MW
965911 AG1-460 C Adder 0.91 MW 0.77 MW
965912 AG1-460 E Adder 1.36 MW 1.16 MW
966091 AG1-478 C 50/50 1.6 MW 1.6 MW
966092 AG1-478 E 50/50 0.4 MW 0.4 MW
966441 AG1-513 C Adder 0.29 MW 0.25 MW
966442 AG1-513 E Adder 0.43 MW 0.37 MW
290051 GSG-6; E Adder 6.18 MW 5.25 MW
290261 S-027 E 50/50 21.64 MW 21.64 MW
290265 S-028 E 50/50 21.51 MW 21.51 MW
295109 WESTBROOK E Adder 3.31 MW 2.81 MW
295111 SUBLETTE E Adder 1.61 MW 1.37 MW
933911 AD1-013 C Adder 1.09 MW 0.93 MW
933912 AD1-013 E Adder 1.74 MW 1.48 MW
934721 AD1-100 C 50/50 7.02 MW 7.02 MW
934722 AD1-100 E 50/50 213.35 MW 213.35 MW
936771 AD2-100 C Adder 9.2 MW 7.82 MW
936772 AD2-100 E Adder 6.14 MW 5.21 MW
936971 AD2-131 C Adder 0.61 MW 0.52 MW
936972 AD2-131 E Adder 3.05 MW 2.59 MW
937002 AD2-134 E Adder 5.97 MW 5.08 MW
942111 AE2-223 C 50/50 2.75 MW 2.75 MW
942112 AE2-223 E 50/50 18.43 MW 18.43 MW
942481 AE2-261 C Adder 13.54 MW 11.51 MW
942482 AE2-261 E Adder 9.03 MW 7.67 MW
959081 AF2-199 C Adder 4.07 MW 3.46 MW
959082 AF2-199 E Adder 2.03 MW 1.73 MW
959341 AF2-225 C 50/50 8.9 MW 8.9 MW
959342 AF2-225 E 50/50 12.29 MW 12.29 MW
959611 AF2-252 C 50/50 2.65 MW 2.65 MW
959612 AF2-252 E 50/50 3.98 MW 3.98 MW
960611 AF2-352 C 50/50 2.65 MW 2.65 MW
960612 AF2-352 E 50/50 3.98 MW 3.98 MW
960751 AF2-366 C Adder 4.1 MW 3.48 MW
960752 AF2-366 E Adder 2.73 MW 2.32 MW
274654 BRAIDWOOD;1U 50/50 40.85 MW 40.85 MW
274655 BRAIDWOOD;2U 50/50 39.59 MW 39.59 MW
274660 LASCO STA;1U 50/50 30.96 MW 30.96 MW
274661 LASCO STA;2U 50/50 31.06 MW 31.06 MW
274847 GR RIDGE ;BU 50/50 0.65 MW 0.65 MW
274853 TWINGROVE;U1 50/50 0.75 MW 0.75 MW
274854 TWINGROVE;U2 50/50 0.78 MW 0.78 MW
274863 CAYUGA RI;1U 50/50 0.78 MW 0.78 MW
274864 CAYUGA RI;2U 50/50 0.78 MW 0.78 MW
274871 GR RIDGE ;2U 50/50 0.24 MW 0.24 MW
274887 PILOT HIL;1U 50/50 0.91 MW 0.91 MW
274888 KELLY CRK;1U 50/50 0.91 MW 0.91 MW
276173 Z2-081 50/50 0.2 MW 0.2 MW
276591 L-013 2 Adder 2.04 MW 1.74 MW
276615 W2-048 GEN Adder 4.77 MW 4.06 MW
276621 X2-022 GEN Adder 16.33 MW 13.88 MW
293061 N-015 E 50/50 17.44 MW 17.44 MW
293715 O-029 E Adder 5.91 MW 5.02 MW
293716 O-029 E Adder 3.24 MW 2.75 MW
293717 O-029 E Adder 2.98 MW 2.53 MW
293771 O-035 E Adder 4.89 MW 4.16 MW
294392 P-010 E 50/50 22.15 MW 22.15 MW
294401 BSHIL;1U E Adder 5.84 MW 4.96 MW
294410 BSHIL;2U E Adder 5.84 MW 4.96 MW
917502 Z2-087 E 50/50 24.58 MW 24.58 MW
925582 AC1-033 E Adder 6.4 MW 5.44 MW
933411 AC2-154 C 50/50 3.01 MW 3.01 MW
933412 AC2-154 E 50/50 4.91 MW 4.91 MW
957381 AF2-032 C Adder 1.04 MW 0.88 MW
957382 AF2-032 E Adder 0.49 MW 0.41 MW
957471 AF2-041 C Adder 12.21 MW 10.38 MW
957472 AF2-041 E Adder 6.1 MW 5.19 MW
274674 JOLIET 9 ;6U Adder 21.02 MW 17.87 MW
274890 CAYUG;1U E 50/50 25.38 MW 25.38 MW
274891 CAYUG;2U E 50/50 25.38 MW 25.38 MW
925772 AC1-053 E Adder 16.24 MW 13.8 MW
934101 AD2-000 1 Adder 3.35 MW 2.85 MW
270681 BRIGHTSTK; R 50/50 0.6 MW 0.6 MW
275149 KELLYCK ;1E 50/50 22.18 MW 22.18 MW
276174 W4-005 E Adder 25.69 MW 21.83 MW
276655 AB2-047 C1 50/50 0.38 MW 0.38 MW
276656 AB2-047 C2 50/50 0.38 MW 0.38 MW
293516 O-009 E Adder 11.43 MW 9.71 MW
293519 PILOT HIL;1E 50/50 22.18 MW 22.18 MW
916212 CRESCENT ;1U Adder 3.44 MW 2.92 MW
924048 AB2-047 E1 50/50 15.24 MW 15.24 MW
924049 AB2-047 E2 50/50 15.48 MW 15.48 MW
927208 AC1-214 E1 Adder 2.32 MW 1.97 MW
927209 AC1-214 E2 Adder 2.32 MW 1.97 MW
957751 AF2-069 C Adder 0.15 MW 0.13 MW
957752 AF2-069 E Adder 0.49 MW 0.42 MW
990901 L-005 E Adder 8.68 MW 7.38 MW
290108 LEEDK;1U E Adder 14.23 MW 12.1 MW
916221 Z1-073 E Adder 4.35 MW 3.7 MW
924266 AB2-070 E Adder 15.07 MW 12.81 MW
926821 AC1-168 C Adder 0.92 MW 0.78 MW
926822 AC1-168 E Adder 6.17 MW 5.25 MW
934051 AD1-031 C Adder 1.94 MW 1.65 MW
934052 AD1-031 E Adder 3.16 MW 2.69 MW
936371 AD2-047 C 50/50 5.39 MW 5.39 MW
936372 AD2-047 E 50/50 26.3 MW 26.3 MW
936461 AD2-060 C 50/50 3.17 MW 3.17 MW
936511 AD2-066 C Adder 5.46 MW 4.64 MW
936512 AD2-066 E Adder 3.64 MW 3.1 MW
943121 AE2-341 C Adder 8.18 MW 6.95 MW
943122 AE2-341 E Adder 4.02 MW 3.41 MW
943591 AF1-030 C Adder 5.44 MW 4.62 MW
943592 AF1-030 E Adder 2.69 MW 2.29 MW
959091 AF2-200 C Adder 8.14 MW 6.92 MW
959092 AF2-200 E Adder 5.43 MW 4.61 MW
960141 AF2-305_AG1- Adder 0.88 MW 0.75 MW
960591 AF2-350 C 50/50 9.5 MW 9.5 MW
960592 AF2-350 E 50/50 6.34 MW 6.34 MW
930481 AB1-089 C Adder 1.47 MW 1.25 MW
939351 AE1-166 C 50/50 23.77 MW 23.77 MW
939352 AE1-166 E 50/50 21.94 MW 21.94 MW
939401 AE1-172 C 50/50 10.83 MW 10.83 MW
939402 AE1-172 E 50/50 50.69 MW 50.69 MW
939741 AE1-205 C 50/50 11.86 MW 11.86 MW
939742 AE1-205 E 50/50 16.38 MW 16.38 MW
946671 AF1-331 C Adder 1.41 MW 1.2 MW
962691 AG1-118 C Adder 13.02 MW 11.07 MW
962692 AG1-118 E Adder 8.68 MW 7.38 MW
963831 AG1-236 C Adder 2.18 MW 1.86 MW
963832 AG1-236 E Adder 14.61 MW 12.42 MW
941551 AE2-152 C 50/50 27.43 MW 27.43 MW
941552 AE2-152 E 50/50 18.29 MW 18.29 MW
941731 AE2-173 C 50/50 7.06 MW 7.06 MW
944221 AF1-090 C Adder 2.32 MW 1.97 MW
944222 AF1-090 E Adder 10.86 MW 9.23 MW
958011 AF2-095 C 50/50 13.69 MW 13.69 MW
958012 AF2-095 E 50/50 9.12 MW 9.12 MW
276626 AG1-044 E Adder 0.04 MW 0.04 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 46.52 MW 46.52 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 14.13 MW 14.13 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.33 MW 1.33 MW
NY PJM->LTFIMP_NY CLTF 0.72 MW 0.72 MW
WEC LTFEXP_WEC->PJM CLTF 1.96 MW 1.96 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.26 MW 0.26 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.13 MW 0.13 MW
TVA LTFEXP_TVA->PJM CLTF 1.43 MW 1.43 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.25 MW 0.25 MW
MEC LTFEXP_MEC->PJM CLTF 8.17 MW 8.17 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.67 MW 0.67 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.97 MW 2.97 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 8.56 MW 8.56 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.41 MW 0.41 MW

Details for AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line l/o COMED_P4_023-65-BT4-5___SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
934720 to 270926 ckt 1
Contingency Name:
COMED_P4_023-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT4-5___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.58 %
Rating: 2107.0 MVA
Rating Type: STE
MVA to Mitigate: 2140.27 MVA
MW Contribution: 21.7 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
AD1-100 TAP-WILTON ; B 345.0 kV Ckt 1 line
934720 to 270926 ckt 1
Contingency Name:
COMED_P4_023-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_023-65-BT4-5___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270607 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275168 TO BUS 270697 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ; R 345.0
 TRIP BRANCH FROM BUS 275168 TO BUS 275268 CKT 1   /*COLLINS  ;2M 345.0 - COLLINS  ;2C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 102.66 %
Rating: 2107.0 MVA
Rating Type: STE
MVA to Mitigate: 2163.03 MVA
MW Contribution: 22.09 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.55 MW 1.32 MW
962012 AG1-044 E Adder 0.04 MW 0.03 MW
962781 AG1-127 C Adder 4.11 MW 3.5 MW
962782 AG1-127 E Adder 2.74 MW 2.33 MW
965091 AG1-374 C 50/50 23.87 MW 23.87 MW
965092 AG1-374 E 50/50 15.91 MW 15.91 MW
965911 AG1-460 C Adder 0.91 MW 0.77 MW
965912 AG1-460 E Adder 1.36 MW 1.16 MW
966091 AG1-478 C 50/50 1.6 MW 1.6 MW
966092 AG1-478 E 50/50 0.4 MW 0.4 MW
966441 AG1-513 C Adder 0.29 MW 0.25 MW
966442 AG1-513 E Adder 0.43 MW 0.37 MW
290051 GSG-6; E Adder 6.18 MW 5.25 MW
290261 S-027 E 50/50 21.64 MW 21.64 MW
290265 S-028 E 50/50 21.51 MW 21.51 MW
295109 WESTBROOK E Adder 3.31 MW 2.81 MW
295111 SUBLETTE E Adder 1.61 MW 1.37 MW
933911 AD1-013 C Adder 1.09 MW 0.93 MW
933912 AD1-013 E Adder 1.74 MW 1.48 MW
934721 AD1-100 C 50/50 7.02 MW 7.02 MW
934722 AD1-100 E 50/50 213.35 MW 213.35 MW
936771 AD2-100 C Adder 9.2 MW 7.82 MW
936772 AD2-100 E Adder 6.14 MW 5.21 MW
936971 AD2-131 C Adder 0.61 MW 0.52 MW
936972 AD2-131 E Adder 3.05 MW 2.59 MW
937002 AD2-134 E Adder 5.97 MW 5.08 MW
942111 AE2-223 C 50/50 2.75 MW 2.75 MW
942112 AE2-223 E 50/50 18.43 MW 18.43 MW
942481 AE2-261 C Adder 13.54 MW 11.51 MW
942482 AE2-261 E Adder 9.03 MW 7.67 MW
959081 AF2-199 C Adder 4.07 MW 3.46 MW
959082 AF2-199 E Adder 2.03 MW 1.73 MW
959341 AF2-225 C 50/50 8.9 MW 8.9 MW
959342 AF2-225 E 50/50 12.29 MW 12.29 MW
959611 AF2-252 C 50/50 2.65 MW 2.65 MW
959612 AF2-252 E 50/50 3.98 MW 3.98 MW
960611 AF2-352 C 50/50 2.65 MW 2.65 MW
960612 AF2-352 E 50/50 3.98 MW 3.98 MW
960751 AF2-366 C Adder 4.1 MW 3.48 MW
960752 AF2-366 E Adder 2.73 MW 2.32 MW
274654 BRAIDWOOD;1U 50/50 40.85 MW 40.85 MW
274655 BRAIDWOOD;2U 50/50 39.59 MW 39.59 MW
274660 LASCO STA;1U 50/50 30.96 MW 30.96 MW
274661 LASCO STA;2U 50/50 31.06 MW 31.06 MW
274847 GR RIDGE ;BU 50/50 0.65 MW 0.65 MW
274853 TWINGROVE;U1 50/50 0.75 MW 0.75 MW
274854 TWINGROVE;U2 50/50 0.78 MW 0.78 MW
274863 CAYUGA RI;1U 50/50 0.78 MW 0.78 MW
274864 CAYUGA RI;2U 50/50 0.78 MW 0.78 MW
274871 GR RIDGE ;2U 50/50 0.24 MW 0.24 MW
274887 PILOT HIL;1U 50/50 0.91 MW 0.91 MW
274888 KELLY CRK;1U 50/50 0.91 MW 0.91 MW
276173 Z2-081 50/50 0.2 MW 0.2 MW
276591 L-013 2 Adder 2.04 MW 1.74 MW
276615 W2-048 GEN Adder 4.77 MW 4.06 MW
276621 X2-022 GEN Adder 16.33 MW 13.88 MW
293061 N-015 E 50/50 17.44 MW 17.44 MW
293715 O-029 E Adder 5.91 MW 5.02 MW
293716 O-029 E Adder 3.24 MW 2.75 MW
293717 O-029 E Adder 2.98 MW 2.53 MW
293771 O-035 E Adder 4.89 MW 4.16 MW
294392 P-010 E 50/50 22.15 MW 22.15 MW
294401 BSHIL;1U E Adder 5.84 MW 4.96 MW
294410 BSHIL;2U E Adder 5.84 MW 4.96 MW
917502 Z2-087 E 50/50 24.58 MW 24.58 MW
925582 AC1-033 E Adder 6.4 MW 5.44 MW
933411 AC2-154 C 50/50 3.01 MW 3.01 MW
933412 AC2-154 E 50/50 4.91 MW 4.91 MW
957381 AF2-032 C Adder 1.04 MW 0.88 MW
957382 AF2-032 E Adder 0.49 MW 0.41 MW
957471 AF2-041 C Adder 12.21 MW 10.38 MW
957472 AF2-041 E Adder 6.1 MW 5.19 MW
274674 JOLIET 9 ;6U Adder 21.02 MW 17.87 MW
274890 CAYUG;1U E 50/50 25.38 MW 25.38 MW
274891 CAYUG;2U E 50/50 25.38 MW 25.38 MW
925772 AC1-053 E Adder 16.24 MW 13.8 MW
934101 AD2-000 1 Adder 3.35 MW 2.85 MW
270681 BRIGHTSTK; R 50/50 0.6 MW 0.6 MW
275149 KELLYCK ;1E 50/50 22.18 MW 22.18 MW
276174 W4-005 E Adder 25.69 MW 21.83 MW
276655 AB2-047 C1 50/50 0.38 MW 0.38 MW
276656 AB2-047 C2 50/50 0.38 MW 0.38 MW
293516 O-009 E Adder 11.43 MW 9.71 MW
293519 PILOT HIL;1E 50/50 22.18 MW 22.18 MW
916212 CRESCENT ;1U Adder 3.44 MW 2.92 MW
924048 AB2-047 E1 50/50 15.24 MW 15.24 MW
924049 AB2-047 E2 50/50 15.48 MW 15.48 MW
927208 AC1-214 E1 Adder 2.32 MW 1.97 MW
927209 AC1-214 E2 Adder 2.32 MW 1.97 MW
957751 AF2-069 C Adder 0.15 MW 0.13 MW
957752 AF2-069 E Adder 0.49 MW 0.42 MW
990901 L-005 E Adder 8.68 MW 7.38 MW
290108 LEEDK;1U E Adder 14.23 MW 12.1 MW
916221 Z1-073 E Adder 4.35 MW 3.7 MW
924266 AB2-070 E Adder 15.07 MW 12.81 MW
926821 AC1-168 C Adder 0.92 MW 0.78 MW
926822 AC1-168 E Adder 6.17 MW 5.25 MW
934051 AD1-031 C Adder 1.94 MW 1.65 MW
934052 AD1-031 E Adder 3.16 MW 2.69 MW
936371 AD2-047 C 50/50 5.39 MW 5.39 MW
936372 AD2-047 E 50/50 26.3 MW 26.3 MW
936461 AD2-060 C 50/50 3.17 MW 3.17 MW
936511 AD2-066 C Adder 5.46 MW 4.64 MW
936512 AD2-066 E Adder 3.64 MW 3.1 MW
943121 AE2-341 C Adder 8.18 MW 6.95 MW
943122 AE2-341 E Adder 4.02 MW 3.41 MW
943591 AF1-030 C Adder 5.44 MW 4.62 MW
943592 AF1-030 E Adder 2.69 MW 2.29 MW
959091 AF2-200 C Adder 8.14 MW 6.92 MW
959092 AF2-200 E Adder 5.43 MW 4.61 MW
960141 AF2-305_AG1- Adder 0.88 MW 0.75 MW
960591 AF2-350 C 50/50 9.5 MW 9.5 MW
960592 AF2-350 E 50/50 6.34 MW 6.34 MW
930481 AB1-089 C Adder 1.47 MW 1.25 MW
939351 AE1-166 C 50/50 23.77 MW 23.77 MW
939352 AE1-166 E 50/50 21.94 MW 21.94 MW
939401 AE1-172 C 50/50 10.83 MW 10.83 MW
939402 AE1-172 E 50/50 50.69 MW 50.69 MW
939741 AE1-205 C 50/50 11.86 MW 11.86 MW
939742 AE1-205 E 50/50 16.38 MW 16.38 MW
946671 AF1-331 C Adder 1.41 MW 1.2 MW
962691 AG1-118 C Adder 13.02 MW 11.07 MW
962692 AG1-118 E Adder 8.68 MW 7.38 MW
963831 AG1-236 C Adder 2.18 MW 1.86 MW
963832 AG1-236 E Adder 14.61 MW 12.42 MW
941551 AE2-152 C 50/50 27.43 MW 27.43 MW
941552 AE2-152 E 50/50 18.29 MW 18.29 MW
941731 AE2-173 C 50/50 7.06 MW 7.06 MW
944221 AF1-090 C Adder 2.32 MW 1.97 MW
944222 AF1-090 E Adder 10.86 MW 9.23 MW
958011 AF2-095 C 50/50 13.69 MW 13.69 MW
958012 AF2-095 E 50/50 9.12 MW 9.12 MW
276626 AG1-044 E Adder 0.04 MW 0.04 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 46.52 MW 46.52 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 14.13 MW 14.13 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.33 MW 1.33 MW
NY PJM->LTFIMP_NY CLTF 0.72 MW 0.72 MW
WEC LTFEXP_WEC->PJM CLTF 1.96 MW 1.96 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.26 MW 0.26 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.13 MW 0.13 MW
TVA LTFEXP_TVA->PJM CLTF 1.43 MW 1.43 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.25 MW 0.25 MW
MEC LTFEXP_MEC->PJM CLTF 8.17 MW 8.17 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.67 MW 0.67 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.97 MW 2.97 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.07 MW 0.07 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 8.56 MW 8.56 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.41 MW 0.41 MW

Details for J1180 POI-05SULLIVAN 345.0 kV Ckt 1 line l/o AEP_P4_#3128_05EUGENE 345_A2_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: AEP/AMIL
Facility Description:
J1180 POI-05SULLIVAN 345.0 kV Ckt 1 line
956820 to 247712 ckt 1
Contingency Name:
AEP_P4_#3128_05EUGENE 345_A2_SRT-A
CONTINGENCY 'AEP_P4_#3128_05EUGENE 345_A2_SRT-A'
 OPEN BRANCH FROM BUS 243221 TO BUS 249504 CKT 1   /*05EUGENE     345.0 - 08CAYSUB     345.0
 OPEN BRANCH FROM BUS 243221 TO BUS 348885 CKT 1   /*05EUGENE     345.0 - 7BUNSONVILLE 345.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 108.18 %
Rating: 1635.0 MVA
Rating Type: B
MVA to Mitigate: 1768.74 MVA
MW Contribution: 18.26 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: AEP/AMIL
Facility Description:
J1180 POI-05SULLIVAN 345.0 kV Ckt 1 line
956820 to 247712 ckt 1
Contingency Name:
AEP_P4_#3128_05EUGENE 345_A2_SRT-A
CONTINGENCY 'AEP_P4_#3128_05EUGENE 345_A2_SRT-A'
 OPEN BRANCH FROM BUS 243221 TO BUS 249504 CKT 1   /*05EUGENE     345.0 - 08CAYSUB     345.0
 OPEN BRANCH FROM BUS 243221 TO BUS 348885 CKT 1   /*05EUGENE     345.0 - 7BUNSONVILLE 345.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 108.04 %
Rating: 1635.0 MVA
Rating Type: B
MVA to Mitigate: 1766.38 MVA
MW Contribution: 18.15 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.42 MW 1.2 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C Adder 3.51 MW 2.98 MW
962782 AG1-127 E Adder 2.33 MW 1.98 MW
965091 AG1-374 C 50/50 21.92 MW 21.92 MW
965092 AG1-374 E 50/50 14.61 MW 14.61 MW
965911 AG1-460 C 50/50 2.06 MW 2.06 MW
965912 AG1-460 E 50/50 3.08 MW 3.08 MW
290021 O50 E Adder 11.02 MW 9.37 MW
290051 GSG-6; E Adder 5.65 MW 4.8 MW
290261 S-027 E 50/50 19.87 MW 19.87 MW
290265 S-028 E 50/50 19.75 MW 19.75 MW
295109 WESTBROOK E Adder 3.03 MW 2.57 MW
295111 SUBLETTE E Adder 1.47 MW 1.25 MW
918052 AA1-018 E OP Adder 8.15 MW 6.93 MW
933911 AD1-013 C Adder 0.99 MW 0.84 MW
933912 AD1-013 E Adder 1.58 MW 1.34 MW
936771 AD2-100 C 50/50 22.16 MW 22.16 MW
936772 AD2-100 E 50/50 14.77 MW 14.77 MW
936971 AD2-131 C 50/50 1.46 MW 1.46 MW
936972 AD2-131 E 50/50 7.33 MW 7.33 MW
937002 AD2-134 E Adder 5.47 MW 4.65 MW
937312 AD2-172 E Adder 1.96 MW 1.67 MW
942111 AE2-223 C 50/50 2.2 MW 2.2 MW
942112 AE2-223 E 50/50 14.73 MW 14.73 MW
942481 AE2-261 C 50/50 30.71 MW 30.71 MW
942482 AE2-261 E 50/50 20.48 MW 20.48 MW
942991 AE2-321 C Adder 4.17 MW 3.54 MW
942992 AE2-321 E Adder 2.05 MW 1.75 MW
958481 AF2-142 C Adder 5.62 MW 4.78 MW
958482 AF2-142 E Adder 3.75 MW 3.19 MW
958491 AF2-143 C Adder 6.05 MW 5.14 MW
958492 AF2-143 E Adder 4.03 MW 3.43 MW
958912 AF2-182 E Adder 21.33 MW 18.13 MW
959081 AF2-199 C Adder 3.94 MW 3.35 MW
959082 AF2-199 E Adder 1.97 MW 1.68 MW
959341 AF2-225 C 50/50 7.11 MW 7.11 MW
959342 AF2-225 E 50/50 9.82 MW 9.82 MW
959351 AF2-226 C Adder 1.23 MW 1.05 MW
959352 AF2-226 E Adder 1.85 MW 1.57 MW
959611 AF2-252 C 50/50 2.44 MW 2.44 MW
959612 AF2-252 E 50/50 3.65 MW 3.65 MW
960281 AF2-319 C Adder 1.23 MW 1.05 MW
960282 AF2-319 E Adder 1.85 MW 1.57 MW
960582 AF2-349 E Adder 18.99 MW 16.14 MW
960611 AF2-352 C 50/50 2.44 MW 2.44 MW
960612 AF2-352 E 50/50 3.65 MW 3.65 MW
960751 AF2-366 C Adder 3.5 MW 2.97 MW
960752 AF2-366 E Adder 2.33 MW 1.98 MW
274650 KINCAID ;1U 50/50 15.4 MW 15.4 MW
274651 KINCAID ;2U 50/50 15.39 MW 15.39 MW
274853 TWINGROVE;U1 50/50 0.69 MW 0.69 MW
274854 TWINGROVE;U2 50/50 0.71 MW 0.71 MW
274859 EASYR;U1 E Adder 7.36 MW 6.26 MW
274860 EASYR;U2 E Adder 7.36 MW 6.26 MW
274880 RADFORD R;1U 50/50 1.12 MW 1.12 MW
276615 W2-048 GEN 50/50 8.47 MW 8.47 MW
276621 X2-022 GEN 50/50 29.0 MW 29.0 MW
293644 O22 E1 Adder 7.09 MW 6.03 MW
293645 O22 E2 Adder 8.12 MW 6.9 MW
293715 O-029 E Adder 6.72 MW 5.71 MW
293716 O-029 E Adder 3.69 MW 3.13 MW
293717 O-029 E Adder 3.39 MW 2.88 MW
293771 O-035 E Adder 5.49 MW 4.66 MW
294401 BSHIL;1U E Adder 6.9 MW 5.87 MW
294410 BSHIL;2U E Adder 6.9 MW 5.87 MW
294763 P-046 E Adder 5.45 MW 4.63 MW
917502 Z2-087 E 50/50 19.64 MW 19.64 MW
925582 AC1-033 E Adder 7.56 MW 6.43 MW
939061 AE1-134 2 Adder 0.89 MW 0.76 MW
940502 AE2-035 E Adder 1.96 MW 1.67 MW
957381 AF2-032 C 50/50 2.31 MW 2.31 MW
957382 AF2-032 E 50/50 1.08 MW 1.08 MW
957471 AF2-041 C Adder 11.83 MW 10.06 MW
957472 AF2-041 E Adder 5.92 MW 5.03 MW
274890 CAYUG;1U E Adder 10.09 MW 8.57 MW
274891 CAYUG;2U E Adder 10.09 MW 8.57 MW
925771 AC1-053 C 50/50 0.64 MW 0.64 MW
925772 AC1-053 E 50/50 26.51 MW 26.51 MW
933441 AC2-157 C Adder -20.71 MW -17.61 MW
938851 AE1-113 C Adder 4.55 MW 3.87 MW
938852 AE1-113 E Adder 16.12 MW 13.7 MW
934101 AD2-000 1 Adder 2.96 MW 2.51 MW
270681 BRIGHTSTK; R 50/50 0.48 MW 0.48 MW
276174 W4-005 E 50/50 39.32 MW 39.32 MW
276655 AB2-047 C1 50/50 0.3 MW 0.3 MW
276656 AB2-047 C2 50/50 0.3 MW 0.3 MW
293516 O-009 E Adder 13.0 MW 11.05 MW
916212 CRESCENT ;1U Adder 3.85 MW 3.28 MW
924048 AB2-047 E1 50/50 12.18 MW 12.18 MW
924049 AB2-047 E2 50/50 12.37 MW 12.37 MW
927208 AC1-214 E1 Adder 2.6 MW 2.21 MW
927209 AC1-214 E2 Adder 2.6 MW 2.21 MW
957751 AF2-069 C Adder 0.17 MW 0.15 MW
957752 AF2-069 E Adder 0.55 MW 0.47 MW
990901 L-005 E Adder 10.69 MW 9.08 MW
290108 LEEDK;1U E Adder 12.25 MW 10.42 MW
916221 Z1-073 E Adder 3.98 MW 3.39 MW
276668 AB2-070 C 50/50 0.64 MW 0.64 MW
924266 AB2-070 E 50/50 23.67 MW 23.67 MW
926821 AC1-168 C Adder 0.83 MW 0.71 MW
926822 AC1-168 E Adder 5.6 MW 4.76 MW
934051 AD1-031 C Adder 2.3 MW 1.95 MW
934052 AD1-031 E Adder 3.75 MW 3.19 MW
935141 AD1-148 C 50/50 0.92 MW 0.92 MW
936292 AD2-038 E Adder 8.31 MW 7.06 MW
936511 AD2-066 C Adder 4.82 MW 4.1 MW
936512 AD2-066 E Adder 3.21 MW 2.73 MW
942421 AE2-255 C Adder 1.72 MW 1.46 MW
942422 AE2-255 E Adder 5.17 MW 4.39 MW
942651 AE2-281 C Adder 0.47 MW 0.4 MW
942652 AE2-281 E Adder 2.89 MW 2.46 MW
959091 AF2-200 C Adder 7.89 MW 6.71 MW
959092 AF2-200 E Adder 5.26 MW 4.47 MW
960141 AF2-305_AG1- 50/50 1.38 MW 1.38 MW
960261 AF2-317 C 50/50 0.39 MW 0.39 MW
961011 AF2-392 C Adder 2.56 MW 2.18 MW
961012 AF2-392 E Adder 11.92 MW 10.13 MW
966822 AG1-553 E Adder 20.92 MW 17.78 MW
930462 AB1-087 E Adder -6.81 MW -5.79 MW
930472 AB1-088 E Adder -6.81 MW -5.79 MW
930481 AB1-089 C Adder 35.71 MW 30.35 MW
930482 AB1-089 E Adder 1.62 MW 1.38 MW
938861 AE1-114 C Adder 2.36 MW 2.0 MW
938862 AE1-114 E Adder 8.04 MW 6.83 MW
939321 AE1-163 C Adder 3.29 MW 2.8 MW
939322 AE1-163 E Adder 20.23 MW 17.19 MW
939401 AE1-172 C Adder 3.39 MW 2.88 MW
939402 AE1-172 E Adder 15.88 MW 13.5 MW
939741 AE1-205 C 50/50 9.48 MW 9.48 MW
939742 AE1-205 E 50/50 13.09 MW 13.09 MW
946152 AF1-280 E Adder 14.22 MW 12.09 MW
946321 AF1-296 C Adder 2.66 MW 2.26 MW
946322 AF1-296 E Adder 12.47 MW 10.6 MW
946671 AF1-331 C Adder 1.29 MW 1.09 MW
962691 AG1-118 C Adder 10.95 MW 9.31 MW
962692 AG1-118 E Adder 7.3 MW 6.21 MW
963831 AG1-236 C 50/50 3.57 MW 3.57 MW
963832 AG1-236 E 50/50 23.86 MW 23.86 MW
941731 AE2-173 C 50/50 5.64 MW 5.64 MW
944221 AF1-090 C 50/50 6.67 MW 6.67 MW
944222 AF1-090 E 50/50 31.22 MW 31.22 MW
965331 AG1-398 C 50/50 0.17 MW 0.17 MW
965931 AG1-462 C Adder 12.31 MW 10.46 MW
965932 AG1-462 E Adder 8.21 MW 6.97 MW
944202 AF1-088 NFTW 50/50 272.55 MW 272.55 MW
920272 AA2-123 E Adder 1.46 MW 1.24 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
991082 J1475 G External Queue 3.86 MW 3.86 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 82.78 MW 82.78 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 52.73 MW 52.73 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 14.74 MW 14.74 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.61 MW 0.61 MW
NY PJM->LTFIMP_NY CLTF 0.34 MW 0.34 MW
WEC LTFEXP_WEC->PJM CLTF 2.11 MW 2.11 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.85 MW 0.85 MW
TVA LTFEXP_TVA->PJM CLTF 7.29 MW 7.29 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.86 MW 0.86 MW
MEC LTFEXP_MEC->PJM CLTF 14.61 MW 14.61 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.17 MW 2.17 MW
LAGN LTFEXP_LAGN->PJM CLTF 11.43 MW 11.43 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.18 MW 0.18 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.94 MW 3.94 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.39 MW 0.39 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4_111-45-L11126__SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
COMED_P4_111-45-L11126__SRT-A
CONTINGENCY 'COMED_P4_111-45-L11126__SRT-A'
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270846 CKT 1                /*ELECT JCT; B 345.0 - PLANO    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270916 CKT 1                /*ELECT JCT; B 345.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270928 CKT 1                /*ELECT JCT; B 345.0 - WOLFS    ; B 345.0
 TRIP BRANCH FROM BUS 270916 TO BUS 270917 CKT 1                /*WAYNE    ; B 345.0 - WAYNE    ; R 345.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.9 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1597.86 MVA
MW Contribution: 49.02 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
COMED_P4_111-45-L11126__SRT-A
CONTINGENCY 'COMED_P4_111-45-L11126__SRT-A'
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270846 CKT 1                /*ELECT JCT; B 345.0 - PLANO    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270916 CKT 1                /*ELECT JCT; B 345.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270928 CKT 1                /*ELECT JCT; B 345.0 - WOLFS    ; B 345.0
 TRIP BRANCH FROM BUS 270916 TO BUS 270917 CKT 1                /*WAYNE    ; B 345.0 - WAYNE    ; R 345.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.96 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1598.73 MVA
MW Contribution: 49.0 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 3.33 MW 3.33 MW
962012 AG1-044 E 50/50 0.09 MW 0.09 MW
962781 AG1-127 C 50/50 8.56 MW 8.56 MW
962782 AG1-127 E 50/50 5.69 MW 5.69 MW
966441 AG1-513 C Adder 0.25 MW 0.21 MW
966442 AG1-513 E Adder 0.37 MW 0.32 MW
290051 GSG-6; E 50/50 13.27 MW 13.27 MW
295109 WESTBROOK E 50/50 7.11 MW 7.11 MW
295111 SUBLETTE E 50/50 3.46 MW 3.46 MW
933911 AD1-013 C 50/50 2.33 MW 2.33 MW
933912 AD1-013 E 50/50 3.73 MW 3.73 MW
937001 AD2-134 C 50/50 0.52 MW 0.52 MW
937002 AD2-134 E 50/50 12.83 MW 12.83 MW
937312 AD2-172 E Adder 2.97 MW 2.53 MW
942991 AE2-321 C Adder 3.68 MW 3.13 MW
942992 AE2-321 E Adder 1.81 MW 1.54 MW
958912 AF2-182 E 50/50 46.78 MW 46.78 MW
959081 AF2-199 C 50/50 21.95 MW 21.95 MW
959082 AF2-199 E 50/50 10.98 MW 10.98 MW
960582 AF2-349 E Adder 18.14 MW 15.42 MW
960751 AF2-366 C 50/50 8.53 MW 8.53 MW
960752 AF2-366 E 50/50 5.69 MW 5.69 MW
274715 NELSON EC;1C 50/50 4.92 MW 4.92 MW
274717 NELSON EC;2C 50/50 4.96 MW 4.96 MW
274738 AURORA EC;3P 50/50 7.66 MW 7.66 MW
274740 AURORA EC;4P 50/50 7.66 MW 7.66 MW
274855 GSG-6 ;RU 50/50 0.54 MW 0.54 MW
274859 EASYR;U1 E Adder 15.27 MW 12.98 MW
274860 EASYR;U2 E Adder 15.27 MW 12.98 MW
276591 L-013 2 Adder 3.44 MW 2.93 MW
293715 O-029 E Adder 12.01 MW 10.21 MW
293716 O-029 E Adder 6.58 MW 5.6 MW
293717 O-029 E Adder 6.05 MW 5.14 MW
294401 BSHIL;1U E Adder 5.08 MW 4.32 MW
294410 BSHIL;2U E Adder 5.08 MW 4.32 MW
294763 P-046 E Adder 8.26 MW 7.02 MW
925582 AC1-033 E Adder 5.57 MW 4.74 MW
939051 AE1-134 1 50/50 0.35 MW 0.35 MW
939061 AE1-134 2 50/50 2.18 MW 2.18 MW
940502 AE2-035 E Adder 2.97 MW 2.53 MW
957471 AF2-041 C 50/50 65.86 MW 65.86 MW
957472 AF2-041 E 50/50 32.93 MW 32.93 MW
274760 LEE CO EC;1U 50/50 2.02 MW 2.02 MW
276602 WESTBROOK C 50/50 0.18 MW 0.18 MW
276603 SUBLETTE C 50/50 0.08 MW 0.08 MW
276676 AA2-030 GEN 50/50 4.59 MW 4.59 MW
276677 AA1-146 50/50 5.55 MW 5.55 MW
293516 O-009 E Adder 23.22 MW 19.73 MW
990901 L-005 E Adder 6.72 MW 5.71 MW
274872 LEE DEKAL;1U 50/50 0.99 MW 0.99 MW
290108 LEEDK;1U E 50/50 29.96 MW 29.96 MW
274850 MENDOTA H;RU 50/50 0.36 MW 0.36 MW
916221 Z1-073 E 50/50 9.35 MW 9.35 MW
274761 LEE CO EC;2U 50/50 2.02 MW 2.02 MW
274762 LEE CO EC;3U 50/50 2.02 MW 2.02 MW
274764 LEE CO EC;5U 50/50 2.03 MW 2.03 MW
274765 LEE CO EC;6U 50/50 2.03 MW 2.03 MW
934051 AD1-031 C Adder 1.67 MW 1.42 MW
934052 AD1-031 E Adder 2.72 MW 2.32 MW
943121 AE2-341 C Adder 9.97 MW 8.48 MW
943122 AE2-341 E Adder 4.9 MW 4.16 MW
943591 AF1-030 C Adder 6.63 MW 5.64 MW
943592 AF1-030 E Adder 3.28 MW 2.79 MW
959091 AF2-200 C 50/50 43.9 MW 43.9 MW
959092 AF2-200 E 50/50 29.27 MW 29.27 MW
961011 AF2-392 C 50/50 5.66 MW 5.66 MW
961012 AF2-392 E 50/50 26.32 MW 26.32 MW
966822 AG1-553 E Adder 33.82 MW 28.75 MW
930481 AB1-089 C Adder 48.25 MW 41.02 MW
930482 AB1-089 E Adder 2.19 MW 1.86 MW
938861 AE1-114 C Adder 4.2 MW 3.57 MW
938862 AE1-114 E Adder 14.33 MW 12.18 MW
946152 AF1-280 E 50/50 31.19 MW 31.19 MW
946321 AF1-296 C Adder 4.36 MW 3.7 MW
946322 AF1-296 E Adder 20.4 MW 17.34 MW
946671 AF1-331 C 50/50 3.03 MW 3.03 MW
962691 AG1-118 C 50/50 29.41 MW 29.41 MW
962692 AG1-118 E 50/50 19.61 MW 19.61 MW
965931 AG1-462 C Adder 19.9 MW 16.92 MW
965932 AG1-462 E Adder 13.27 MW 11.28 MW
274716 NELSON EC;1S 50/50 3.59 MW 3.59 MW
274718 NELSON EC;2S 50/50 3.62 MW 3.62 MW
276626 AG1-044 E 50/50 0.09 MW 0.09 MW
955972 J1084 External Queue 15.76 MW 15.76 MW
956412 J1131 External Queue 8.27 MW 8.27 MW
990947 J1432 C External Queue 3.58 MW 3.58 MW
990948 J1432 E External Queue 19.36 MW 19.36 MW
991092 J1477 External Queue 4.14 MW 4.14 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 45.88 MW 45.88 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 7.67 MW 7.67 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.79 MW 0.79 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.43 MW 0.43 MW
NY PJM->LTFIMP_NY CLTF 0.24 MW 0.24 MW
WEC LTFEXP_WEC->PJM CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.08 MW 1.08 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.14 MW 0.14 MW
MEC LTFEXP_MEC->PJM CLTF 10.06 MW 10.06 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.41 MW 0.41 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.47 MW 2.47 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.78 MW 2.78 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.03 MW 0.03 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4_111-45-L16704T_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
COMED_P4_111-45-L16704T_SRT-A
CONTINGENCY 'COMED_P4_111-45-L16704T_SRT-A'
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270916 CKT 1                /*ELECT JCT; B 345.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270928 CKT 1                /*ELECT JCT; B 345.0 - WOLFS    ; B 345.0
 TRIP BRANCH FROM BUS 270846 TO BUS 270730 CKT 1                /*PLANO    ; B 345.0 - ELECT JCT; B 345.0
 TRIP BRANCH FROM BUS 270846 TO BUS 272278 TO BUS 275354 CKT 1  /*PLANO    ; B 345.0 - PLANO;1I     138.0 - PLANO;1C      34.5
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
 TRIP BRANCH FROM BUS 272250 TO BUS 272278 CKT 2                /*PLANO    ; B 138.0 - PLANO;1I     138.0
 TRIP BRANCH FROM BUS 272250 TO BUS 272278 CKT Z1               /*PLANO    ; B 138.0 - PLANO;1I     138.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.7 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1594.72 MVA
MW Contribution: 55.5 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
COMED_P4_111-45-L16704T_SRT-A
CONTINGENCY 'COMED_P4_111-45-L16704T_SRT-A'
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270916 CKT 1                /*ELECT JCT; B 345.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270928 CKT 1                /*ELECT JCT; B 345.0 - WOLFS    ; B 345.0
 TRIP BRANCH FROM BUS 270846 TO BUS 270730 CKT 1                /*PLANO    ; B 345.0 - ELECT JCT; B 345.0
 TRIP BRANCH FROM BUS 270846 TO BUS 272278 TO BUS 275354 CKT 1  /*PLANO    ; B 345.0 - PLANO;1I     138.0 - PLANO;1C      34.5
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
 TRIP BRANCH FROM BUS 272250 TO BUS 272278 CKT 2                /*PLANO    ; B 138.0 - PLANO;1I     138.0
 TRIP BRANCH FROM BUS 272250 TO BUS 272278 CKT Z1               /*PLANO    ; B 138.0 - PLANO;1I     138.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.73 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1595.08 MVA
MW Contribution: 55.55 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 3.71 MW 3.71 MW
962012 AG1-044 E 50/50 0.09 MW 0.09 MW
962781 AG1-127 C 50/50 9.77 MW 9.77 MW
962782 AG1-127 E 50/50 6.5 MW 6.5 MW
966441 AG1-513 C Adder 0.29 MW 0.25 MW
966442 AG1-513 E Adder 0.44 MW 0.37 MW
290051 GSG-6; E 50/50 14.76 MW 14.76 MW
295109 WESTBROOK E 50/50 7.9 MW 7.9 MW
295111 SUBLETTE E 50/50 3.84 MW 3.84 MW
933911 AD1-013 C 50/50 2.6 MW 2.6 MW
933912 AD1-013 E 50/50 4.16 MW 4.16 MW
937001 AD2-134 C 50/50 0.58 MW 0.58 MW
937002 AD2-134 E 50/50 14.27 MW 14.27 MW
937312 AD2-172 E Adder 3.03 MW 2.57 MW
942991 AE2-321 C Adder 3.85 MW 3.27 MW
942992 AE2-321 E Adder 1.89 MW 1.61 MW
958912 AF2-182 E 50/50 46.98 MW 46.98 MW
959081 AF2-199 C 50/50 22.12 MW 22.12 MW
959082 AF2-199 E 50/50 11.06 MW 11.06 MW
960582 AF2-349 E Adder 18.84 MW 16.02 MW
960751 AF2-366 C 50/50 9.75 MW 9.75 MW
960752 AF2-366 E 50/50 6.5 MW 6.5 MW
274715 NELSON EC;1C 50/50 4.96 MW 4.96 MW
274717 NELSON EC;2C 50/50 5.0 MW 5.0 MW
274738 AURORA EC;3P 50/50 7.93 MW 7.93 MW
274740 AURORA EC;4P 50/50 7.93 MW 7.93 MW
274855 GSG-6 ;RU 50/50 0.6 MW 0.6 MW
274859 EASYR;U1 E Adder 15.31 MW 13.01 MW
274860 EASYR;U2 E Adder 15.31 MW 13.01 MW
276591 L-013 2 Adder 3.63 MW 3.08 MW
293715 O-029 E Adder 12.18 MW 10.35 MW
293716 O-029 E Adder 6.68 MW 5.68 MW
293717 O-029 E Adder 6.14 MW 5.22 MW
294401 BSHIL;1U E Adder 5.17 MW 4.4 MW
294410 BSHIL;2U E Adder 5.17 MW 4.4 MW
294763 P-046 E Adder 8.41 MW 7.15 MW
925582 AC1-033 E Adder 5.67 MW 4.82 MW
939051 AE1-134 1 50/50 0.35 MW 0.35 MW
939061 AE1-134 2 50/50 2.2 MW 2.2 MW
940502 AE2-035 E Adder 3.03 MW 2.57 MW
957471 AF2-041 C 50/50 66.36 MW 66.36 MW
957472 AF2-041 E 50/50 33.18 MW 33.18 MW
274760 LEE CO EC;1U 50/50 2.03 MW 2.03 MW
276602 WESTBROOK C 50/50 0.2 MW 0.2 MW
276603 SUBLETTE C 50/50 0.09 MW 0.09 MW
276676 AA2-030 GEN 50/50 4.63 MW 4.63 MW
276677 AA1-146 50/50 5.6 MW 5.6 MW
293516 O-009 E Adder 23.55 MW 20.02 MW
990901 L-005 E Adder 6.85 MW 5.82 MW
274872 LEE DEKAL;1U 50/50 1.13 MW 1.13 MW
290108 LEEDK;1U E 50/50 34.23 MW 34.23 MW
274850 MENDOTA H;RU 50/50 0.4 MW 0.4 MW
916221 Z1-073 E 50/50 10.4 MW 10.4 MW
274761 LEE CO EC;2U 50/50 2.03 MW 2.03 MW
274762 LEE CO EC;3U 50/50 2.03 MW 2.03 MW
274764 LEE CO EC;5U 50/50 2.03 MW 2.03 MW
274765 LEE CO EC;6U 50/50 2.03 MW 2.03 MW
934051 AD1-031 C Adder 1.7 MW 1.45 MW
934052 AD1-031 E Adder 2.77 MW 2.36 MW
943121 AE2-341 C 50/50 15.52 MW 15.52 MW
943122 AE2-341 E 50/50 7.62 MW 7.62 MW
943591 AF1-030 C 50/50 10.32 MW 10.32 MW
943592 AF1-030 E 50/50 5.11 MW 5.11 MW
959091 AF2-200 C 50/50 44.24 MW 44.24 MW
959092 AF2-200 E 50/50 29.5 MW 29.5 MW
961011 AF2-392 C 50/50 5.75 MW 5.75 MW
961012 AF2-392 E 50/50 26.76 MW 26.76 MW
966822 AG1-553 E Adder 34.13 MW 29.01 MW
930481 AB1-089 C Adder 46.01 MW 39.11 MW
930482 AB1-089 E Adder 2.09 MW 1.78 MW
938861 AE1-114 C Adder 4.29 MW 3.64 MW
938862 AE1-114 E Adder 14.63 MW 12.43 MW
946152 AF1-280 E 50/50 31.32 MW 31.32 MW
946321 AF1-296 C Adder 4.41 MW 3.75 MW
946322 AF1-296 E Adder 20.63 MW 17.53 MW
946671 AF1-331 C 50/50 3.38 MW 3.38 MW
962691 AG1-118 C 50/50 33.3 MW 33.3 MW
962692 AG1-118 E 50/50 22.2 MW 22.2 MW
965931 AG1-462 C Adder 20.09 MW 17.07 MW
965932 AG1-462 E Adder 13.39 MW 11.38 MW
274716 NELSON EC;1S 50/50 3.62 MW 3.62 MW
274718 NELSON EC;2S 50/50 3.65 MW 3.65 MW
920272 AA2-123 E Adder 1.31 MW 1.11 MW
276626 AG1-044 E 50/50 0.09 MW 0.09 MW
955972 J1084 External Queue 15.89 MW 15.89 MW
956412 J1131 External Queue 8.34 MW 8.34 MW
990947 J1432 C External Queue 3.61 MW 3.61 MW
990948 J1432 E External Queue 19.52 MW 19.52 MW
991092 J1477 External Queue 4.18 MW 4.18 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 46.52 MW 46.52 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 7.8 MW 7.8 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.77 MW 0.77 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.44 MW 0.44 MW
NY PJM->LTFIMP_NY CLTF 0.24 MW 0.24 MW
WEC LTFEXP_WEC->PJM CLTF 0.34 MW 0.34 MW
TVA LTFEXP_TVA->PJM CLTF 1.09 MW 1.09 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.15 MW 0.15 MW
MEC LTFEXP_MEC->PJM CLTF 10.18 MW 10.18 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.41 MW 0.41 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.5 MW 2.5 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.85 MW 2.85 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.03 MW 0.03 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P4-6_111-345-R______SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
COMED_P4-6_111-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-R______SRT-A'
 DISCONNECT BUS 270731   /*ELECT JCT;4R 345.0
 DISCONNECT BUS 270733   /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183   /*ELECT JCT;3M 138.0
 DISCONNECT BUS 275184   /*ELECT JCT;4M 138.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 100.69 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1578.74 MVA
MW Contribution: 38.16 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
COMED_P4-6_111-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_111-345-R______SRT-A'
 DISCONNECT BUS 270731   /*ELECT JCT;4R 345.0
 DISCONNECT BUS 270733   /*ELECT JCT;3R 345.0
 DISCONNECT BUS 275183   /*ELECT JCT;3M 138.0
 DISCONNECT BUS 275184   /*ELECT JCT;4M 138.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 100.37 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1573.8 MVA
MW Contribution: 38.23 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.45 MW 2.08 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C 50/50 6.82 MW 6.82 MW
962782 AG1-127 E 50/50 4.54 MW 4.54 MW
966441 AG1-513 C 50/50 0.53 MW 0.53 MW
966442 AG1-513 E 50/50 0.8 MW 0.8 MW
290051 GSG-6; E Adder 9.7 MW 8.24 MW
295109 WESTBROOK E Adder 5.19 MW 4.41 MW
295111 SUBLETTE E Adder 2.52 MW 2.15 MW
933911 AD1-013 C Adder 1.72 MW 1.46 MW
933912 AD1-013 E Adder 2.74 MW 2.33 MW
937002 AD2-134 E Adder 9.38 MW 7.97 MW
937312 AD2-172 E Adder 2.09 MW 1.77 MW
942991 AE2-321 C Adder 4.13 MW 3.51 MW
942992 AE2-321 E Adder 2.03 MW 1.73 MW
958912 AF2-182 E Adder 26.57 MW 22.58 MW
959081 AF2-199 C 50/50 9.73 MW 9.73 MW
959082 AF2-199 E 50/50 4.87 MW 4.87 MW
960582 AF2-349 E Adder 18.21 MW 15.48 MW
960751 AF2-366 C 50/50 6.8 MW 6.8 MW
960752 AF2-366 E 50/50 4.53 MW 4.53 MW
274737 AURORA EC;1P 50/50 3.23 MW 3.23 MW
274738 AURORA EC;3P 50/50 5.06 MW 5.06 MW
274740 AURORA EC;4P 50/50 5.06 MW 5.06 MW
274741 AURORA EC;5P 50/50 1.11 MW 1.11 MW
274742 AURORA EC;6P 50/50 1.11 MW 1.11 MW
274743 AURORA EC;7P 50/50 1.11 MW 1.11 MW
274744 AURORA EC;8P 50/50 1.11 MW 1.11 MW
274745 AURORA EC;9P 50/50 1.11 MW 1.11 MW
274746 AURORA EC;0P 50/50 1.11 MW 1.11 MW
274859 EASYR;U1 E Adder 9.07 MW 7.71 MW
274860 EASYR;U2 E Adder 9.07 MW 7.71 MW
276591 L-013 2 50/50 3.98 MW 3.98 MW
293715 O-029 E Adder 6.52 MW 5.54 MW
293716 O-029 E Adder 3.57 MW 3.04 MW
293717 O-029 E Adder 3.28 MW 2.79 MW
294763 P-046 E Adder 5.8 MW 4.93 MW
939061 AE1-134 2 Adder 1.14 MW 0.97 MW
940502 AE2-035 E Adder 2.09 MW 1.77 MW
957471 AF2-041 C 50/50 29.2 MW 29.2 MW
957472 AF2-041 E 50/50 14.6 MW 14.6 MW
293516 O-009 E Adder 12.6 MW 10.71 MW
274872 LEE DEKAL;1U 50/50 0.78 MW 0.78 MW
290108 LEEDK;1U E 50/50 23.48 MW 23.48 MW
916221 Z1-073 E Adder 6.83 MW 5.81 MW
943121 AE2-341 C 50/50 12.49 MW 12.49 MW
943122 AE2-341 E 50/50 6.13 MW 6.13 MW
943591 AF1-030 C 50/50 8.3 MW 8.3 MW
943592 AF1-030 E 50/50 4.11 MW 4.11 MW
959091 AF2-200 C 50/50 19.47 MW 19.47 MW
959092 AF2-200 E 50/50 12.98 MW 12.98 MW
961011 AF2-392 C Adder 3.1 MW 2.64 MW
961012 AF2-392 E Adder 14.44 MW 12.28 MW
966822 AG1-553 E Adder 17.37 MW 14.76 MW
930481 AB1-089 C Adder 45.8 MW 38.93 MW
930482 AB1-089 E Adder 2.08 MW 1.77 MW
938861 AE1-114 C Adder 2.67 MW 2.27 MW
938862 AE1-114 E Adder 9.11 MW 7.74 MW
946152 AF1-280 E Adder 17.71 MW 15.05 MW
946321 AF1-296 C Adder 2.28 MW 1.94 MW
946322 AF1-296 E Adder 10.66 MW 9.06 MW
946671 AF1-331 C Adder 2.23 MW 1.89 MW
962691 AG1-118 C 50/50 22.9 MW 22.9 MW
962692 AG1-118 E 50/50 15.26 MW 15.26 MW
965931 AG1-462 C Adder 10.22 MW 8.69 MW
965932 AG1-462 E Adder 6.81 MW 5.79 MW
276170 Z1-108 E Adder 1.19 MW 1.01 MW
920272 AA2-123 E Adder 1.45 MW 1.23 MW
276626 AG1-044 E Adder 0.06 MW 0.05 MW
955972 J1084 External Queue 8.81 MW 8.81 MW
990947 J1432 C External Queue 2.01 MW 2.01 MW
990948 J1432 E External Queue 10.88 MW 10.88 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 13.19 MW 13.19 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.57 MW 2.57 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.38 MW 0.38 MW
NY PJM->LTFIMP_NY CLTF 0.21 MW 0.21 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.09 MW 0.09 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.05 MW 0.05 MW
TVA LTFEXP_TVA->PJM CLTF 0.28 MW 0.28 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.17 MW 0.17 MW
MEC LTFEXP_MEC->PJM CLTF 4.74 MW 4.74 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.5 MW 0.5 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.91 MW 0.91 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.47 MW 2.47 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.14 MW 0.14 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o COMED_P2-2_111_EJ-345B__2_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
COMED_P2-2_111_EJ-345B__2_SRT-A
CONTINGENCY 'COMED_P2-2_111_EJ-345B__2_SRT-A'
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270846 CKT 1                /*ELECT JCT; B 345.0 - PLANO    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270916 CKT 1                /*ELECT JCT; B 345.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270928 CKT 1                /*ELECT JCT; B 345.0 - WOLFS    ; B 345.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Contingency Type: Bus
DC|AC: AC
Final Cycle Loading: 100.26 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1572.01 MVA
MW Contribution: 48.49 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
COMED_P2-2_111_EJ-345B__2_SRT-A
CONTINGENCY 'COMED_P2-2_111_EJ-345B__2_SRT-A'
 DISCONNECT BUS 275239                                          /*ELECT JCT;2M 138.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270846 CKT 1                /*ELECT JCT; B 345.0 - PLANO    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270916 CKT 1                /*ELECT JCT; B 345.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 270730 TO BUS 270928 CKT 1                /*ELECT JCT; B 345.0 - WOLFS    ; B 345.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
Contingency Type: Bus
DC|AC: AC
Final Cycle Loading: 100.31 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1572.8 MVA
MW Contribution: 48.48 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 3.29 MW 3.29 MW
962012 AG1-044 E 50/50 0.09 MW 0.09 MW
962781 AG1-127 C 50/50 8.45 MW 8.45 MW
962782 AG1-127 E 50/50 5.62 MW 5.62 MW
966441 AG1-513 C Adder 0.26 MW 0.22 MW
966442 AG1-513 E Adder 0.39 MW 0.33 MW
290051 GSG-6; E 50/50 13.08 MW 13.08 MW
295109 WESTBROOK E 50/50 7.0 MW 7.0 MW
295111 SUBLETTE E 50/50 3.4 MW 3.4 MW
933911 AD1-013 C 50/50 2.3 MW 2.3 MW
933912 AD1-013 E 50/50 3.67 MW 3.67 MW
937001 AD2-134 C 50/50 0.51 MW 0.51 MW
937002 AD2-134 E 50/50 12.65 MW 12.65 MW
937312 AD2-172 E Adder 2.86 MW 2.43 MW
942991 AE2-321 C Adder 3.53 MW 3.0 MW
942992 AE2-321 E Adder 1.74 MW 1.48 MW
958912 AF2-182 E 50/50 45.53 MW 45.53 MW
959081 AF2-199 C 50/50 21.8 MW 21.8 MW
959082 AF2-199 E 50/50 10.9 MW 10.9 MW
960582 AF2-349 E Adder 17.45 MW 14.84 MW
960751 AF2-366 C 50/50 8.42 MW 8.42 MW
960752 AF2-366 E 50/50 5.62 MW 5.62 MW
274715 NELSON EC;1C 50/50 4.83 MW 4.83 MW
274717 NELSON EC;2C 50/50 4.86 MW 4.86 MW
274738 AURORA EC;3P 50/50 7.6 MW 7.6 MW
274740 AURORA EC;4P 50/50 7.6 MW 7.6 MW
274855 GSG-6 ;RU 50/50 0.53 MW 0.53 MW
274859 EASYR;U1 E Adder 14.8 MW 12.58 MW
274860 EASYR;U2 E Adder 14.8 MW 12.58 MW
276591 L-013 2 Adder 3.4 MW 2.89 MW
293715 O-029 E Adder 11.77 MW 10.0 MW
293716 O-029 E Adder 6.45 MW 5.48 MW
293717 O-029 E Adder 5.93 MW 5.04 MW
294401 BSHIL;1U E Adder 4.98 MW 4.24 MW
294410 BSHIL;2U E Adder 4.98 MW 4.24 MW
294763 P-046 E Adder 7.94 MW 6.75 MW
925582 AC1-033 E Adder 5.46 MW 4.64 MW
939051 AE1-134 1 50/50 0.34 MW 0.34 MW
939061 AE1-134 2 50/50 2.14 MW 2.14 MW
940502 AE2-035 E Adder 2.86 MW 2.43 MW
957471 AF2-041 C 50/50 65.39 MW 65.39 MW
957472 AF2-041 E 50/50 32.7 MW 32.7 MW
274760 LEE CO EC;1U 50/50 1.96 MW 1.96 MW
276602 WESTBROOK C 50/50 0.17 MW 0.17 MW
276603 SUBLETTE C 50/50 0.08 MW 0.08 MW
276676 AA2-030 GEN 50/50 4.5 MW 4.5 MW
276677 AA1-146 50/50 5.45 MW 5.45 MW
293516 O-009 E Adder 22.75 MW 19.34 MW
990901 L-005 E Adder 6.58 MW 5.6 MW
274872 LEE DEKAL;1U 50/50 0.98 MW 0.98 MW
290108 LEEDK;1U E 50/50 29.59 MW 29.59 MW
274850 MENDOTA H;RU 50/50 0.35 MW 0.35 MW
916221 Z1-073 E 50/50 9.22 MW 9.22 MW
274761 LEE CO EC;2U 50/50 1.96 MW 1.96 MW
274762 LEE CO EC;3U 50/50 1.96 MW 1.96 MW
274764 LEE CO EC;5U 50/50 1.96 MW 1.96 MW
274765 LEE CO EC;6U 50/50 1.96 MW 1.96 MW
934051 AD1-031 C Adder 1.64 MW 1.39 MW
934052 AD1-031 E Adder 2.67 MW 2.27 MW
943121 AE2-341 C Adder 9.99 MW 8.49 MW
943122 AE2-341 E Adder 4.9 MW 4.17 MW
943591 AF1-030 C Adder 6.64 MW 5.65 MW
943592 AF1-030 E Adder 3.29 MW 2.79 MW
959091 AF2-200 C 50/50 43.59 MW 43.59 MW
959092 AF2-200 E 50/50 29.06 MW 29.06 MW
961011 AF2-392 C 50/50 5.54 MW 5.54 MW
961012 AF2-392 E 50/50 25.79 MW 25.79 MW
966822 AG1-553 E Adder 33.1 MW 28.14 MW
930481 AB1-089 C Adder 43.51 MW 36.98 MW
930482 AB1-089 E Adder 1.98 MW 1.68 MW
938861 AE1-114 C Adder 4.08 MW 3.46 MW
938862 AE1-114 E Adder 13.91 MW 11.82 MW
946152 AF1-280 E 50/50 30.35 MW 30.35 MW
946321 AF1-296 C Adder 4.26 MW 3.62 MW
946322 AF1-296 E Adder 19.95 MW 16.96 MW
946671 AF1-331 C 50/50 2.99 MW 2.99 MW
962691 AG1-118 C 50/50 29.1 MW 29.1 MW
962692 AG1-118 E 50/50 19.4 MW 19.4 MW
965931 AG1-462 C Adder 19.48 MW 16.56 MW
965932 AG1-462 E Adder 12.99 MW 11.04 MW
274716 NELSON EC;1S 50/50 3.52 MW 3.52 MW
274718 NELSON EC;2S 50/50 3.55 MW 3.55 MW
276626 AG1-044 E 50/50 0.09 MW 0.09 MW
955972 J1084 External Queue 15.5 MW 15.5 MW
956412 J1131 External Queue 8.13 MW 8.13 MW
990947 J1432 C External Queue 3.51 MW 3.51 MW
990948 J1432 E External Queue 19.0 MW 19.0 MW
991092 J1477 External Queue 4.07 MW 4.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 43.56 MW 43.56 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 7.48 MW 7.48 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.8 MW 0.8 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.42 MW 0.42 MW
NY PJM->LTFIMP_NY CLTF 0.23 MW 0.23 MW
WEC LTFEXP_WEC->PJM CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.05 MW 1.05 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.14 MW 0.14 MW
MEC LTFEXP_MEC->PJM CLTF 9.77 MW 9.77 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.39 MW 0.39 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.4 MW 2.4 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.68 MW 2.68 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.03 MW 0.03 MW

Details for GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 104.81 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1643.5 MVA
MW Contribution: 12.33 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 105.36 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1652.03 MVA
MW Contribution: 12.21 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C 80/20 4.92 MW 4.92 MW
933911 AD1-013 C 80/20 1.43 MW 1.43 MW
937001 AD2-134 C 80/20 0.32 MW 0.32 MW
942991 AE2-321 C 80/20 4.66 MW 4.66 MW
959081 AF2-199 C 80/20 3.53 MW 3.53 MW
960751 AF2-366 C 80/20 4.91 MW 4.91 MW
274656 BYRON ;1U 80/20 48.42 MW 48.42 MW
274657 BYRON ;2U 80/20 47.36 MW 47.36 MW
274662 QUAD CITI;1U 80/20 14.92 MW 14.92 MW
274663 QUAD CITI;2U 80/20 14.97 MW 14.97 MW
274699 CORDOVA ;1C 80/20 2.62 MW 2.62 MW
274700 CORDOVA ;2C 80/20 2.62 MW 2.62 MW
274701 CORDOVA ;1S 80/20 2.95 MW 2.95 MW
274715 NELSON EC;1C 80/20 3.48 MW 3.48 MW
274717 NELSON EC;2C 80/20 3.5 MW 3.5 MW
274822 ROCKFORD ;11 80/20 7.08 MW 7.08 MW
274823 ROCKFORD ;21 80/20 7.11 MW 7.11 MW
274824 ROCKFORD ;12 80/20 7.03 MW 7.03 MW
274855 GSG-6 ;RU 80/20 0.34 MW 0.34 MW
274856 ECOGROVE ;U1 80/20 0.66 MW 0.66 MW
274857 BIG SKY ;U1 80/20 0.44 MW 0.44 MW
274858 BIG SKY ;U2 80/20 0.44 MW 0.44 MW
276156 O-029 C 80/20 0.19 MW 0.19 MW
276157 O-029 C 80/20 0.34 MW 0.34 MW
276158 O-029 C 80/20 0.34 MW 0.34 MW
276590 R-018 80/20 0.26 MW 0.26 MW
939051 AE1-134 1 80/20 0.25 MW 0.25 MW
939061 AE1-134 2 80/20 1.54 MW 1.54 MW
957471 AF2-041 C 80/20 10.59 MW 10.59 MW
274760 LEE CO EC;1U 80/20 2.45 MW 2.45 MW
274881 WALNUT RG;1U 80/20 0.73 MW 0.73 MW
276602 WESTBROOK C 80/20 0.11 MW 0.11 MW
276603 SUBLETTE C 80/20 0.05 MW 0.05 MW
276611 AD2-172 C 80/20 0.72 MW 0.72 MW
276612 AE2-035 C 80/20 0.72 MW 0.72 MW
276676 AA2-030 GEN 80/20 3.24 MW 3.24 MW
276677 AA1-146 80/20 3.92 MW 3.92 MW
274872 LEE DEKAL;1U 80/20 0.52 MW 0.52 MW
274850 MENDOTA H;RU 80/20 0.22 MW 0.22 MW
274761 LEE CO EC;2U 80/20 2.45 MW 2.45 MW
274762 LEE CO EC;3U 80/20 2.45 MW 2.45 MW
274763 LEE CO EC;4U 80/20 2.43 MW 2.43 MW
274764 LEE CO EC;5U 80/20 2.46 MW 2.46 MW
274765 LEE CO EC;6U 80/20 2.46 MW 2.46 MW
274766 LEE CO EC;7U 80/20 2.42 MW 2.42 MW
274767 LEE CO EC;8U 80/20 2.42 MW 2.42 MW
959091 AF2-200 C 80/20 7.06 MW 7.06 MW
961011 AF2-392 C 80/20 4.49 MW 4.49 MW
930481 AB1-089 C 80/20 139.47 MW 139.47 MW
938861 AE1-114 C 80/20 6.03 MW 6.03 MW
946321 AF1-296 C 80/20 3.49 MW 3.49 MW
946671 AF1-331 C 80/20 1.85 MW 1.85 MW
962691 AG1-118 C 80/20 12.33 MW 12.33 MW
965931 AG1-462 C 80/20 15.38 MW 15.38 MW
274716 NELSON EC;1S 80/20 2.54 MW 2.54 MW
274718 NELSON EC;2S 80/20 2.56 MW 2.56 MW
955972 J1084 External Queue 11.01 MW 11.01 MW
956412 J1131 External Queue 5.83 MW 5.83 MW
990117 J1214 G External Queue 38.41 MW 38.41 MW
990407 J1304 G External Queue 9.36 MW 9.36 MW
990512 J1326 G External Queue 9.62 MW 9.62 MW
990727 J1377 G External Queue 16.43 MW 16.43 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
991092 J1477 External Queue 2.92 MW 2.92 MW
991777 J1629 G External Queue 10.95 MW 10.95 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.9 MW 59.9 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.75 MW 6.75 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.04 MW 0.04 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.84 MW 9.84 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.29 MW 2.29 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.09 MW 0.09 MW

Details for CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 104.81 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1643.5 MVA
MW Contribution: 12.33 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 105.36 %
Rating: 1568.0 MVA
Rating Type: STE
MVA to Mitigate: 1652.03 MVA
MW Contribution: 12.21 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C 80/20 4.92 MW 4.92 MW
933911 AD1-013 C 80/20 1.43 MW 1.43 MW
937001 AD2-134 C 80/20 0.32 MW 0.32 MW
942991 AE2-321 C 80/20 4.66 MW 4.66 MW
959081 AF2-199 C 80/20 3.53 MW 3.53 MW
960751 AF2-366 C 80/20 4.91 MW 4.91 MW
274656 BYRON ;1U 80/20 48.42 MW 48.42 MW
274657 BYRON ;2U 80/20 47.36 MW 47.36 MW
274662 QUAD CITI;1U 80/20 14.92 MW 14.92 MW
274663 QUAD CITI;2U 80/20 14.97 MW 14.97 MW
274699 CORDOVA ;1C 80/20 2.62 MW 2.62 MW
274700 CORDOVA ;2C 80/20 2.62 MW 2.62 MW
274701 CORDOVA ;1S 80/20 2.95 MW 2.95 MW
274715 NELSON EC;1C 80/20 3.48 MW 3.48 MW
274717 NELSON EC;2C 80/20 3.5 MW 3.5 MW
274822 ROCKFORD ;11 80/20 7.08 MW 7.08 MW
274823 ROCKFORD ;21 80/20 7.11 MW 7.11 MW
274824 ROCKFORD ;12 80/20 7.03 MW 7.03 MW
274855 GSG-6 ;RU 80/20 0.34 MW 0.34 MW
274856 ECOGROVE ;U1 80/20 0.66 MW 0.66 MW
274857 BIG SKY ;U1 80/20 0.44 MW 0.44 MW
274858 BIG SKY ;U2 80/20 0.44 MW 0.44 MW
276156 O-029 C 80/20 0.19 MW 0.19 MW
276157 O-029 C 80/20 0.34 MW 0.34 MW
276158 O-029 C 80/20 0.34 MW 0.34 MW
276590 R-018 80/20 0.26 MW 0.26 MW
939051 AE1-134 1 80/20 0.25 MW 0.25 MW
939061 AE1-134 2 80/20 1.54 MW 1.54 MW
957471 AF2-041 C 80/20 10.59 MW 10.59 MW
274760 LEE CO EC;1U 80/20 2.45 MW 2.45 MW
274881 WALNUT RG;1U 80/20 0.73 MW 0.73 MW
276602 WESTBROOK C 80/20 0.11 MW 0.11 MW
276603 SUBLETTE C 80/20 0.05 MW 0.05 MW
276611 AD2-172 C 80/20 0.72 MW 0.72 MW
276612 AE2-035 C 80/20 0.72 MW 0.72 MW
276676 AA2-030 GEN 80/20 3.24 MW 3.24 MW
276677 AA1-146 80/20 3.92 MW 3.92 MW
274872 LEE DEKAL;1U 80/20 0.52 MW 0.52 MW
274850 MENDOTA H;RU 80/20 0.22 MW 0.22 MW
274761 LEE CO EC;2U 80/20 2.45 MW 2.45 MW
274762 LEE CO EC;3U 80/20 2.45 MW 2.45 MW
274763 LEE CO EC;4U 80/20 2.43 MW 2.43 MW
274764 LEE CO EC;5U 80/20 2.46 MW 2.46 MW
274765 LEE CO EC;6U 80/20 2.46 MW 2.46 MW
274766 LEE CO EC;7U 80/20 2.42 MW 2.42 MW
274767 LEE CO EC;8U 80/20 2.42 MW 2.42 MW
959091 AF2-200 C 80/20 7.06 MW 7.06 MW
961011 AF2-392 C 80/20 4.49 MW 4.49 MW
930481 AB1-089 C 80/20 139.47 MW 139.47 MW
938861 AE1-114 C 80/20 6.03 MW 6.03 MW
946321 AF1-296 C 80/20 3.49 MW 3.49 MW
946671 AF1-331 C 80/20 1.85 MW 1.85 MW
962691 AG1-118 C 80/20 12.33 MW 12.33 MW
965931 AG1-462 C 80/20 15.38 MW 15.38 MW
274716 NELSON EC;1S 80/20 2.54 MW 2.54 MW
274718 NELSON EC;2S 80/20 2.56 MW 2.56 MW
955972 J1084 External Queue 11.01 MW 11.01 MW
956412 J1131 External Queue 5.83 MW 5.83 MW
990117 J1214 G External Queue 38.41 MW 38.41 MW
990407 J1304 G External Queue 9.36 MW 9.36 MW
990512 J1326 G External Queue 9.62 MW 9.62 MW
990727 J1377 G External Queue 16.43 MW 16.43 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
991092 J1477 External Queue 2.92 MW 2.92 MW
991777 J1629 G External Queue 10.95 MW 10.95 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.9 MW 59.9 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.75 MW 6.75 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.04 MW 0.04 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.84 MW 9.84 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.29 MW 2.29 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.09 MW 0.09 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
Base Case
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 100.3 %
Rating: 1201.0 MVA
Rating Type: A
MVA to Mitigate: 1204.62 MVA
MW Contribution: 18.65 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
Base Case
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 100.27 %
Rating: 1201.0 MVA
Rating Type: A
MVA to Mitigate: 1204.27 MVA
MW Contribution: 18.68 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C 80/20 5.51 MW 5.51 MW
966441 AG1-513 C 80/20 0.27 MW 0.27 MW
933911 AD1-013 C 80/20 1.4 MW 1.4 MW
937001 AD2-134 C 80/20 0.31 MW 0.31 MW
959081 AF2-199 C 80/20 8.79 MW 8.79 MW
960751 AF2-366 C 80/20 5.49 MW 5.49 MW
274656 BYRON ;1U 80/20 11.0 MW 11.0 MW
274657 BYRON ;2U 80/20 10.72 MW 10.72 MW
274662 QUAD CITI;1U 80/20 8.4 MW 8.4 MW
274663 QUAD CITI;2U 80/20 8.43 MW 8.43 MW
274699 CORDOVA ;1C 80/20 1.48 MW 1.48 MW
274700 CORDOVA ;2C 80/20 1.48 MW 1.48 MW
274701 CORDOVA ;1S 80/20 1.67 MW 1.67 MW
274715 NELSON EC;1C 80/20 2.19 MW 2.19 MW
274717 NELSON EC;2C 80/20 2.2 MW 2.2 MW
274738 AURORA EC;3P 80/20 4.34 MW 4.34 MW
274740 AURORA EC;4P 80/20 4.34 MW 4.34 MW
274741 AURORA EC;5P 80/20 0.57 MW 0.57 MW
274742 AURORA EC;6P 80/20 0.57 MW 0.57 MW
274743 AURORA EC;7P 80/20 0.57 MW 0.57 MW
274744 AURORA EC;8P 80/20 0.57 MW 0.57 MW
274745 AURORA EC;9P 80/20 0.57 MW 0.57 MW
274746 AURORA EC;0P 80/20 0.57 MW 0.57 MW
274818 ELGIN EC ;1P 80/20 1.54 MW 1.54 MW
274819 ELGIN EC ;3P 80/20 1.35 MW 1.35 MW
274820 ELGIN EC ;2P 80/20 1.54 MW 1.54 MW
274821 ELGIN EC ;4P 80/20 1.36 MW 1.36 MW
274855 GSG-6 ;RU 80/20 0.32 MW 0.32 MW
274857 BIG SKY ;U1 80/20 0.18 MW 0.18 MW
274858 BIG SKY ;U2 80/20 0.18 MW 0.18 MW
276156 O-029 C 80/20 0.12 MW 0.12 MW
276157 O-029 C 80/20 0.21 MW 0.21 MW
276158 O-029 C 80/20 0.21 MW 0.21 MW
939051 AE1-134 1 80/20 0.16 MW 0.16 MW
939061 AE1-134 2 80/20 0.97 MW 0.97 MW
957471 AF2-041 C 80/20 26.38 MW 26.38 MW
274760 LEE CO EC;1U 80/20 0.98 MW 0.98 MW
274881 WALNUT RG;1U 80/20 0.44 MW 0.44 MW
276602 WESTBROOK C 80/20 0.1 MW 0.1 MW
276603 SUBLETTE C 80/20 0.05 MW 0.05 MW
276676 AA2-030 GEN 80/20 2.04 MW 2.04 MW
276677 AA1-146 80/20 2.47 MW 2.47 MW
274872 LEE DEKAL;1U 80/20 0.63 MW 0.63 MW
274850 MENDOTA H;RU 80/20 0.21 MW 0.21 MW
274761 LEE CO EC;2U 80/20 0.98 MW 0.98 MW
274762 LEE CO EC;3U 80/20 0.98 MW 0.98 MW
274763 LEE CO EC;4U 80/20 0.97 MW 0.97 MW
274764 LEE CO EC;5U 80/20 0.98 MW 0.98 MW
274765 LEE CO EC;6U 80/20 0.98 MW 0.98 MW
274766 LEE CO EC;7U 80/20 0.97 MW 0.97 MW
274767 LEE CO EC;8U 80/20 0.97 MW 0.97 MW
943121 AE2-341 C 80/20 9.76 MW 9.76 MW
943591 AF1-030 C 80/20 6.49 MW 6.49 MW
959091 AF2-200 C 80/20 17.59 MW 17.59 MW
961011 AF2-392 C 80/20 2.62 MW 2.62 MW
930481 AB1-089 C 80/20 33.84 MW 33.84 MW
938861 AE1-114 C 80/20 2.14 MW 2.14 MW
946321 AF1-296 C 80/20 1.93 MW 1.93 MW
946671 AF1-331 C 80/20 1.82 MW 1.82 MW
962691 AG1-118 C 80/20 18.65 MW 18.65 MW
965931 AG1-462 C 80/20 8.69 MW 8.69 MW
274716 NELSON EC;1S 80/20 1.59 MW 1.59 MW
274718 NELSON EC;2S 80/20 1.61 MW 1.61 MW
955972 J1084 External Queue 7.6 MW 7.6 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 8.47 MW 8.47 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.52 MW 2.52 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.16 MW 0.16 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.06 MW 0.06 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.03 MW 0.03 MW
TVA LTFEXP_TVA->PJM CLTF 0.29 MW 0.29 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.12 MW 0.12 MW
MEC LTFEXP_MEC->PJM CLTF 3.93 MW 3.93 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.36 MW 0.36 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.82 MW 0.82 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 152.36 % 1075.0 B 1637.88 25.1
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 152.36 % 1075.0 B 1637.84 25.1
AEP/OVEC 05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line
242865 to 248000 ckt Z1
AEP_P1-2_#709_546_SRT-A
CONTINGENCY 'AEP_P1-2_#709_546_SRT-A'
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
END
Single AC 116.44 % 2255.0 B 2625.64 17.09
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
Base Case Single AC 113.67 % 1075.0 A 1221.92 14.21
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 106.66 % 1399.0 B 1492.13 22.69
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 106.66 % 1399.0 B 1492.1 22.69
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 104.99 % 971.0 B 1019.44 18.81
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 104.99 % 971.0 B 1019.44 18.81
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Breaker AC 150.27 % 971.0 B 1459.09 31.12
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Breaker AC 150.19 % 971.0 B 1458.35 31.36
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Breaker AC 150.19 % 971.0 B 1458.35 31.36
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4-6_116-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_116-345-R______SRT-A'
 DISCONNECT BUS 270767                                          /*GOODINGS ;1R 345.0
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 DISCONNECT BUS 275240                                          /*GOODINGS ;1M 138.0
 TRIP BRANCH FROM BUS 270729 TO BUS 271385 TO BUS 275351 CKT 1  /*E FRANKFO; R 345.0 - E FRANKFO; R 138.0 - E FRANKFO;3C  34.5
END
Breaker AC 111.94 % 2297.0 STE 2571.36 26.52
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Breaker AC 127.75 % 970.0 STE 1239.13 31.36
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Breaker AC 127.75 % 970.0 STE 1239.13 31.36
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Breaker AC 127.71 % 970.0 STE 1238.79 31.12
CE WILTON ;4M-WILTON ; 345.0/765.0 kV Ckt 1 transformer
275233 to 270644 ckt 1
COMED_P4_112-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Breaker AC 119.54 % 1469.0 STE 1756.0 40.22
CE WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line
270927 to 275233 ckt 1
COMED_P4_112-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Breaker AC 119.37 % 1469.0 STE 1753.58 40.22
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Breaker AC 126.8 % 1399.0 B 1773.9 37.85
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Breaker AC 126.79 % 1399.0 B 1773.83 37.85
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Breaker AC 126.77 % 1399.0 B 1773.54 37.68
CE WILTON ;3M-WILTON ; 345.0/765.0 kV Ckt 1 transformer
275232 to 270644 ckt 1
COMED_P4_112-65-BT5-6___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT5-6___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Breaker AC 116.5 % 1469.0 STE 1711.46 39.18
CE WILTON ; B-WILTON ;3M 345.0 kV Ckt 1 line
270926 to 275232 ckt 1
COMED_P4_112-65-BT5-6___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT5-6___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Breaker AC 116.34 % 1469.0 STE 1708.97 39.18
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-L11614__SRT-A
CONTINGENCY 'COMED_P4_116-45-L11614__SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270665 CKT 1   /*BLUE ISL ;RT 345.0 - BLUE ISL ; R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270927 CKT 1   /*BLUE ISL ;RT 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 270667 CKT 1   /*GOODINGS ;2R 345.0 - BLUE ISL ;RT 345.0
END
Breaker AC 107.16 % 2297.0 STE 2461.53 22.72
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-TR82____SRT-A
CONTINGENCY 'COMED_P4_116-45-TR82____SRT-A'
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 271565 TO BUS 275324 CKT 1  /*GOODINGS ;2R 345.0 - GOODINGS ; R 138.0 - GOODINGS ;2C  34.5
END
Breaker AC 103.69 % 2297.0 STE 2381.75 22.67
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P4_116-45-L0303___SRT-A
CONTINGENCY 'COMED_P4_116-45-L0303___SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 REMOVE SWSHUNT FROM BUS 270827                    /*NEVADA   ; R 345.0
 TRIP BRANCH FROM BUS 936290 TO BUS 270827 CKT 1   /*AD2-038 TP   345.0 - NEVADA   ; R 345.0
END
Breaker AC 102.07 % 2297.0 STE 2344.58 22.67
AEP 05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
AEP_P4_#7334_05JEFRSO 765_A2_SRT-A
CONTINGENCY 'AEP_P4_#7334_05JEFRSO 765_A2_SRT-A'
 OPEN BRANCH FROM BUS 242865 TO BUS 243208 CKT 2    /*05JEFRSO     345.0 - 05JEFRSO     765.0
 OPEN BRANCH FROM BUS 242865 TO BUS 248000 CKT Z1   /*05JEFRSO     345.0 - 06CLIFTY     345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1    /*05HANG R     765.0 - 05JEFRSO     765.0
END
Breaker AC 112.18 % 4142.0 B 4646.47 68.72
CE E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Breaker AC 110.79 % 1399.0 B 1549.97 38.15
CE E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Breaker AC 110.76 % 1399.0 B 1549.49 38.32
CE E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Breaker AC 110.75 % 1399.0 B 1549.42 38.32
AEP 05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
AEP_P4_#6189_05HANG R 765_D1_SRT-A
CONTINGENCY 'AEP_P4_#6189_05HANG R 765_D1_SRT-A'
 OPEN BRANCH FROM BUS 242921 TO BUS 242924 CKT 1   /*05CORNU      765.0 - 05HANG R     765.0
 OPEN BRANCH FROM BUS 242921 TO BUS 242934 CKT 1   /*05CORNU      765.0 - 05CORNU      345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
 REMOVE UNIT 1A FROM BUS 247245                    /*05HRKG1A      18.0
 REMOVE UNIT 1B FROM BUS 247246                    /*05HRKG1B      18.0
 REMOVE UNIT 1S FROM BUS 247247                    /*05HRKG1S      18.0
 REMOVE UNIT 2 FROM BUS 247249                     /*05HRKG2B      18.0
 REMOVE UNIT 2A FROM BUS 247248                    /*05HRKG2A      18.0
 REMOVE UNIT 2S FROM BUS 247250                    /*05HRKG2S      18.0
END
Breaker AC 101.0 % 4142.0 B 4183.58 62.4
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
COMED_P2-2_116_GG-345R__2_SRT-A
CONTINGENCY 'COMED_P2-2_116_GG-345R__2_SRT-A'
 DISCONNECT BUS 270769   /*GOODINGS ;2R 345.0
END
Bus AC 103.69 % 2297.0 STE 2381.82 22.67
AEP 05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
AEP_P7-1_#11046___SRT-A
CONTINGENCY 'AEP_P7-1_#11046___SRT-A'
 OPEN BRANCH FROM BUS 243219 TO BUS 246955 CKT 1   /*05DUMONT     345.0 - 05OLIVE_BP   345.0
 OPEN BRANCH FROM BUS 243228 TO BUS 243234 CKT 1   /*05MERIDN     345.0 - 05TWIN B     345.0
 OPEN BRANCH FROM BUS 243232 TO BUS 246955 CKT 1   /*05SORENS     345.0 - 05OLIVE_BP   345.0
END
Tower AC 100.58 % 4142.0 B 4166.19 61.56

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/NIPS
Facility Description:
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
Contingency Name:
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 152.36 %
Rating: 1075.0 MVA
Rating Type: B
MVA to Mitigate: 1637.88 MVA
MW Contribution: 25.1 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 7.93 MW 6.74 MW
965091 AG1-374 C Adder 19.2 MW 16.32 MW
966091 AG1-478 C Adder 2.39 MW 2.03 MW
966431 AG1-512 C Adder 2.01 MW 1.71 MW
966441 AG1-513 C Adder 0.58 MW 0.49 MW
933911 AD1-013 C Adder 2.09 MW 1.77 MW
942111 AE2-223 C Adder 2.18 MW 1.85 MW
942991 AE2-321 C Adder 9.23 MW 7.85 MW
958481 AF2-142 C Adder 12.72 MW 10.81 MW
958491 AF2-143 C Adder 12.4 MW 10.54 MW
959081 AF2-199 C Adder 8.06 MW 6.86 MW
959341 AF2-225 C Adder 7.04 MW 5.98 MW
959351 AF2-226 C Adder 2.89 MW 2.46 MW
959611 AF2-252 C Adder 2.13 MW 1.81 MW
960281 AF2-319 C Adder 2.89 MW 2.46 MW
960611 AF2-352 C Adder 2.13 MW 1.81 MW
960751 AF2-366 C Adder 7.91 MW 6.72 MW
274675 JOLIET 29;7U Adder 82.41 MW 70.05 MW
274676 JOLIET 29;8U Adder 82.42 MW 70.05 MW
274682 WAUKEGAN ;7U Adder 46.74 MW 39.73 MW
274683 WAUKEGAN ;8U Adder 50.39 MW 42.84 MW
274687 WILL CNTY;4U Adder 78.02 MW 66.31 MW
274723 RIVER EC ;12 80/20 5.12 MW 5.12 MW
274724 RIVER EC ;11 80/20 5.12 MW 5.12 MW
274752 CRETE EC ;2U 80/20 1.94 MW 1.94 MW
274753 CRETE EC ;3U 80/20 1.94 MW 1.94 MW
274754 CRETE EC ;4U 80/20 1.94 MW 1.94 MW
274788 SE CHICAG;5U 80/20 7.23 MW 7.23 MW
274789 SE CHICAG;6U 80/20 7.23 MW 7.23 MW
274790 SE CHICAG;7U 80/20 7.23 MW 7.23 MW
274791 SE CHICAG;8U 80/20 7.23 MW 7.23 MW
274792 SE CHICAG;9U 80/20 7.14 MW 7.14 MW
274793 SE CHICAG;0U 80/20 7.14 MW 7.14 MW
274794 SE CHICAG;1U 80/20 7.14 MW 7.14 MW
274795 SE CHICAG;2U 80/20 7.14 MW 7.14 MW
274799 UNIV PARK;2U 80/20 1.4 MW 1.4 MW
274800 UNIV PARK;3U 80/20 1.4 MW 1.4 MW
274801 UNIV PARK;4U 80/20 1.4 MW 1.4 MW
274826 FISK ;BP 80/20 2.65 MW 2.65 MW
274827 FISK ;RP 80/20 1.88 MW 1.88 MW
274887 PILOT HIL;1U 80/20 0.9 MW 0.9 MW
274888 KELLY CRK;1U 80/20 0.9 MW 0.9 MW
276164 X3-005 C 80/20 0.1 MW 0.1 MW
933411 AC2-154 C 80/20 2.99 MW 2.99 MW
939061 AE1-134 2 Adder 1.55 MW 1.32 MW
957331 AF2-027 C Adder 2.83 MW 2.4 MW
957471 AF2-041 C Adder 24.19 MW 20.56 MW
274674 JOLIET 9 ;6U Adder 42.33 MW 35.98 MW
938851 AE1-113 C Adder 9.03 MW 7.68 MW
934101 AD2-000 1 Adder 6.54 MW 5.56 MW
934111 AD2-000 2 Adder 6.8 MW 5.78 MW
957751 AF2-069 C Adder 0.24 MW 0.21 MW
926821 AC1-168 C Adder 1.29 MW 1.1 MW
934051 AD1-031 C Adder 3.23 MW 2.75 MW
936371 AD2-047 C 80/20 5.35 MW 5.35 MW
936461 AD2-060 C 80/20 3.15 MW 3.15 MW
936511 AD2-066 C Adder 9.54 MW 8.11 MW
942421 AE2-255 C Adder 3.42 MW 2.91 MW
942651 AE2-281 C Adder 0.96 MW 0.82 MW
943121 AE2-341 C Adder 14.46 MW 12.29 MW
943591 AF1-030 C Adder 9.62 MW 8.17 MW
959091 AF2-200 C Adder 16.13 MW 13.71 MW
960591 AF2-350 C 80/20 9.44 MW 9.44 MW
961011 AF2-392 C Adder 4.49 MW 3.81 MW
961501 AF2-441 C 80/20 14.88 MW 14.88 MW
930481 AB1-089 C Adder 74.2 MW 63.07 MW
938861 AE1-114 C Adder 4.44 MW 3.78 MW
939321 AE1-163 C Adder 6.75 MW 5.74 MW
939351 AE1-166 C Adder 11.61 MW 9.87 MW
939401 AE1-172 C Adder 6.11 MW 5.19 MW
939741 AE1-205 C Adder 9.38 MW 7.97 MW
946321 AF1-296 C Adder 4.03 MW 3.43 MW
946671 AF1-331 C Adder 2.71 MW 2.3 MW
962691 AG1-118 C Adder 25.1 MW 21.34 MW
941551 AE2-152 C Adder 13.4 MW 11.39 MW
941731 AE2-173 C Adder 5.58 MW 4.75 MW
957371 AF2-031 C 80/20 1.55 MW 1.55 MW
958011 AF2-095 C 80/20 13.6 MW 13.6 MW
965931 AG1-462 C Adder 18.16 MW 15.44 MW
274798 UNIV PARK;1U 80/20 1.41 MW 1.41 MW
274751 CRETE EC ;1U 80/20 1.94 MW 1.94 MW
955742 J1058 G External Queue 35.28 MW 35.28 MW
990547 J1333 G External Queue 40.52 MW 40.52 MW
990552 J1334 G External Queue 40.52 MW 40.52 MW
990557 J1335 G External Queue 40.52 MW 40.52 MW
990562 J1336 G External Queue 40.52 MW 40.52 MW
990577 J1339 External Queue 26.57 MW 26.57 MW
990582 J1340 External Queue 26.57 MW 26.57 MW
990647 J1355 External Queue 42.27 MW 42.27 MW
990662 J1358 External Queue 14.93 MW 14.93 MW
990762 J1386 External Queue 12.93 MW 12.93 MW
991247 J1684 G External Queue 33.62 MW 33.62 MW
991332 J1785 External Queue 13.53 MW 13.53 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 118.13 MW 118.13 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 18.89 MW 18.89 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.27 MW 1.27 MW
WEC LTFEXP_WEC->PJM CLTF 4.42 MW 4.42 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.55 MW 0.55 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.28 MW 0.28 MW
TVA LTFEXP_TVA->PJM CLTF 1.79 MW 1.79 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.51 MW 0.51 MW
MEC LTFEXP_MEC->PJM CLTF 14.93 MW 14.93 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.42 MW 1.42 MW
LAGN LTFEXP_LAGN->PJM CLTF 4.33 MW 4.33 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.83 MW 0.83 MW

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/NIPS
Facility Description:
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
Contingency Name:
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 152.36 %
Rating: 1075.0 MVA
Rating Type: B
MVA to Mitigate: 1637.84 MVA
MW Contribution: 25.1 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 7.93 MW 6.74 MW
965091 AG1-374 C Adder 19.2 MW 16.32 MW
966091 AG1-478 C Adder 2.39 MW 2.03 MW
966431 AG1-512 C Adder 2.01 MW 1.71 MW
966441 AG1-513 C Adder 0.58 MW 0.49 MW
933911 AD1-013 C Adder 2.09 MW 1.77 MW
942111 AE2-223 C Adder 2.18 MW 1.85 MW
942991 AE2-321 C Adder 9.23 MW 7.85 MW
958481 AF2-142 C Adder 12.72 MW 10.81 MW
958491 AF2-143 C Adder 12.4 MW 10.54 MW
959081 AF2-199 C Adder 8.06 MW 6.86 MW
959341 AF2-225 C Adder 7.04 MW 5.98 MW
959351 AF2-226 C Adder 2.89 MW 2.46 MW
959611 AF2-252 C Adder 2.13 MW 1.81 MW
960281 AF2-319 C Adder 2.89 MW 2.46 MW
960611 AF2-352 C Adder 2.13 MW 1.81 MW
960751 AF2-366 C Adder 7.91 MW 6.72 MW
274675 JOLIET 29;7U Adder 82.41 MW 70.05 MW
274676 JOLIET 29;8U Adder 82.42 MW 70.05 MW
274682 WAUKEGAN ;7U Adder 46.74 MW 39.73 MW
274683 WAUKEGAN ;8U Adder 50.39 MW 42.84 MW
274687 WILL CNTY;4U Adder 78.02 MW 66.31 MW
274723 RIVER EC ;12 80/20 5.12 MW 5.12 MW
274724 RIVER EC ;11 80/20 5.12 MW 5.12 MW
274752 CRETE EC ;2U 80/20 1.94 MW 1.94 MW
274753 CRETE EC ;3U 80/20 1.94 MW 1.94 MW
274754 CRETE EC ;4U 80/20 1.94 MW 1.94 MW
274788 SE CHICAG;5U 80/20 7.23 MW 7.23 MW
274789 SE CHICAG;6U 80/20 7.23 MW 7.23 MW
274790 SE CHICAG;7U 80/20 7.23 MW 7.23 MW
274791 SE CHICAG;8U 80/20 7.23 MW 7.23 MW
274792 SE CHICAG;9U 80/20 7.14 MW 7.14 MW
274793 SE CHICAG;0U 80/20 7.14 MW 7.14 MW
274794 SE CHICAG;1U 80/20 7.14 MW 7.14 MW
274795 SE CHICAG;2U 80/20 7.14 MW 7.14 MW
274799 UNIV PARK;2U 80/20 1.4 MW 1.4 MW
274800 UNIV PARK;3U 80/20 1.4 MW 1.4 MW
274801 UNIV PARK;4U 80/20 1.4 MW 1.4 MW
274826 FISK ;BP 80/20 2.65 MW 2.65 MW
274827 FISK ;RP 80/20 1.88 MW 1.88 MW
274887 PILOT HIL;1U 80/20 0.9 MW 0.9 MW
274888 KELLY CRK;1U 80/20 0.9 MW 0.9 MW
276164 X3-005 C 80/20 0.1 MW 0.1 MW
933411 AC2-154 C 80/20 2.99 MW 2.99 MW
939061 AE1-134 2 Adder 1.55 MW 1.32 MW
957331 AF2-027 C Adder 2.83 MW 2.4 MW
957471 AF2-041 C Adder 24.19 MW 20.56 MW
274674 JOLIET 9 ;6U Adder 42.33 MW 35.98 MW
938851 AE1-113 C Adder 9.03 MW 7.68 MW
934101 AD2-000 1 Adder 6.54 MW 5.56 MW
934111 AD2-000 2 Adder 6.8 MW 5.78 MW
957751 AF2-069 C Adder 0.24 MW 0.21 MW
926821 AC1-168 C Adder 1.29 MW 1.1 MW
934051 AD1-031 C Adder 3.23 MW 2.75 MW
936371 AD2-047 C 80/20 5.35 MW 5.35 MW
936461 AD2-060 C 80/20 3.15 MW 3.15 MW
936511 AD2-066 C Adder 9.54 MW 8.11 MW
942421 AE2-255 C Adder 3.42 MW 2.91 MW
942651 AE2-281 C Adder 0.96 MW 0.82 MW
943121 AE2-341 C Adder 14.46 MW 12.29 MW
943591 AF1-030 C Adder 9.62 MW 8.17 MW
959091 AF2-200 C Adder 16.13 MW 13.71 MW
960591 AF2-350 C 80/20 9.44 MW 9.44 MW
961011 AF2-392 C Adder 4.49 MW 3.81 MW
961501 AF2-441 C 80/20 14.88 MW 14.88 MW
930481 AB1-089 C Adder 74.2 MW 63.07 MW
938861 AE1-114 C Adder 4.44 MW 3.78 MW
939321 AE1-163 C Adder 6.75 MW 5.74 MW
939351 AE1-166 C Adder 11.61 MW 9.87 MW
939401 AE1-172 C Adder 6.11 MW 5.19 MW
939741 AE1-205 C Adder 9.38 MW 7.97 MW
946321 AF1-296 C Adder 4.03 MW 3.43 MW
946671 AF1-331 C Adder 2.71 MW 2.3 MW
962691 AG1-118 C Adder 25.1 MW 21.34 MW
941551 AE2-152 C Adder 13.4 MW 11.39 MW
941731 AE2-173 C Adder 5.58 MW 4.75 MW
957371 AF2-031 C 80/20 1.55 MW 1.55 MW
958011 AF2-095 C 80/20 13.6 MW 13.6 MW
965931 AG1-462 C Adder 18.16 MW 15.44 MW
274798 UNIV PARK;1U 80/20 1.41 MW 1.41 MW
274751 CRETE EC ;1U 80/20 1.94 MW 1.94 MW
955742 J1058 G External Queue 35.28 MW 35.28 MW
990547 J1333 G External Queue 40.52 MW 40.52 MW
990552 J1334 G External Queue 40.52 MW 40.52 MW
990557 J1335 G External Queue 40.52 MW 40.52 MW
990562 J1336 G External Queue 40.52 MW 40.52 MW
990577 J1339 External Queue 26.57 MW 26.57 MW
990582 J1340 External Queue 26.57 MW 26.57 MW
990647 J1355 External Queue 42.27 MW 42.27 MW
990662 J1358 External Queue 14.93 MW 14.93 MW
990762 J1386 External Queue 12.93 MW 12.93 MW
991247 J1684 G External Queue 33.62 MW 33.62 MW
991332 J1785 External Queue 13.53 MW 13.53 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 118.13 MW 118.13 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 18.89 MW 18.89 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.27 MW 1.27 MW
WEC LTFEXP_WEC->PJM CLTF 4.42 MW 4.42 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.55 MW 0.55 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.28 MW 0.28 MW
TVA LTFEXP_TVA->PJM CLTF 1.79 MW 1.79 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.51 MW 0.51 MW
MEC LTFEXP_MEC->PJM CLTF 14.93 MW 14.93 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.42 MW 1.42 MW
LAGN LTFEXP_LAGN->PJM CLTF 4.33 MW 4.33 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.83 MW 0.83 MW

Details for 05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line l/o AEP_P1-2_#709_546_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/OVEC
Facility Description:
05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line
242865 to 248000 ckt Z1
Contingency Name:
AEP_P1-2_#709_546_SRT-A
CONTINGENCY 'AEP_P1-2_#709_546_SRT-A'
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 116.44 %
Rating: 2255.0 MVA
Rating Type: B
MVA to Mitigate: 2625.64 MVA
MW Contribution: 17.09 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
243353 05OLIVE 80/20 0.08 MW 0.08 MW
962781 AG1-127 C Adder 5.41 MW 4.59 MW
966841 AG1-555 C 80/20 11.45 MW 11.45 MW
965091 AG1-374 C Adder 17.23 MW 14.65 MW
965681 AG1-436 C 80/20 7.82 MW 7.82 MW
966091 AG1-478 C Adder 1.56 MW 1.33 MW
966431 AG1-512 C Adder 1.6 MW 1.36 MW
966441 AG1-513 C Adder 0.39 MW 0.33 MW
942111 AE2-223 C Adder 1.88 MW 1.6 MW
958481 AF2-142 C Adder 8.68 MW 7.38 MW
958491 AF2-143 C Adder 8.6 MW 7.31 MW
959341 AF2-225 C Adder 6.08 MW 5.16 MW
959351 AF2-226 C Adder 1.93 MW 1.64 MW
959611 AF2-252 C Adder 1.91 MW 1.63 MW
960281 AF2-319 C Adder 1.93 MW 1.64 MW
960611 AF2-352 C Adder 1.91 MW 1.63 MW
960681 AF2-359 C 80/20 7.82 MW 7.82 MW
960751 AF2-366 C Adder 5.39 MW 4.58 MW
243441 05CKG2 80/20 20.68 MW 20.68 MW
243442 05RKG1 80/20 67.03 MW 67.03 MW
243443 05RKG2 80/20 66.14 MW 66.14 MW
243859 05FR-11G C 80/20 0.54 MW 0.54 MW
243862 05FR-12G C 80/20 0.26 MW 0.26 MW
243864 05FR-21G C 80/20 0.27 MW 0.27 MW
243866 05FR-22G C 80/20 0.27 MW 0.27 MW
243870 05FR-3G C 80/20 0.26 MW 0.26 MW
243873 05FR-4G C 80/20 0.61 MW 0.61 MW
244415 05OLIV SLR C 80/20 0.04 MW 0.04 MW
274675 JOLIET 29;7U Adder 53.94 MW 45.85 MW
274676 JOLIET 29;8U Adder 53.94 MW 45.85 MW
274682 WAUKEGAN ;7U Adder 31.34 MW 26.64 MW
274683 WAUKEGAN ;8U Adder 33.81 MW 28.74 MW
274687 WILL CNTY;4U Adder 50.12 MW 42.6 MW
274752 CRETE EC ;2U 80/20 1.24 MW 1.24 MW
274753 CRETE EC ;3U 80/20 1.24 MW 1.24 MW
274754 CRETE EC ;4U 80/20 1.24 MW 1.24 MW
274771 LINCOLN ;2U 80/20 1.26 MW 1.26 MW
274772 LINCOLN ;3U 80/20 1.26 MW 1.26 MW
274773 LINCOLN ;4U 80/20 1.26 MW 1.26 MW
274774 LINCOLN ;5U 80/20 1.26 MW 1.26 MW
274775 LINCOLN ;6U 80/20 1.26 MW 1.26 MW
274776 LINCOLN ;7U 80/20 1.26 MW 1.26 MW
274777 LINCOLN ;8U 80/20 1.26 MW 1.26 MW
274788 SE CHICAG;5U Adder 3.71 MW 3.15 MW
274789 SE CHICAG;6U Adder 3.71 MW 3.15 MW
274790 SE CHICAG;7U Adder 3.71 MW 3.15 MW
274791 SE CHICAG;8U Adder 3.71 MW 3.15 MW
274792 SE CHICAG;9U 80/20 3.71 MW 3.71 MW
274793 SE CHICAG;0U 80/20 3.71 MW 3.71 MW
274794 SE CHICAG;1U 80/20 3.71 MW 3.71 MW
274795 SE CHICAG;2U 80/20 3.71 MW 3.71 MW
933411 AC2-154 C Adder 1.89 MW 1.6 MW
946581 AF1-322 C 80/20 11.11 MW 11.11 MW
957331 AF2-027 C Adder 1.9 MW 1.61 MW
274674 JOLIET 9 ;6U Adder 27.57 MW 23.44 MW
246909 05MDL-1G C 80/20 0.56 MW 0.56 MW
246910 05MDL-2G C 80/20 0.33 MW 0.33 MW
246976 05MDL-3G C 80/20 0.33 MW 0.33 MW
246979 05MDL-4G C 80/20 0.25 MW 0.25 MW
933441 AC2-157 C 80/20 12.82 MW 12.82 MW
938851 AE1-113 C Adder 6.29 MW 5.34 MW
934101 AD2-000 1 Adder 4.53 MW 3.85 MW
934111 AD2-000 2 Adder 4.53 MW 3.85 MW
270100 AB1-080 CT1 80/20 3.96 MW 3.96 MW
270101 AB1-080 CT2 80/20 3.96 MW 3.96 MW
270102 AB1-080 ST 80/20 4.28 MW 4.28 MW
247556 05MDL-5G 80/20 0.43 MW 0.43 MW
270180 AB1-006 W1 80/20 0.49 MW 0.49 MW
270181 AB1-006 W2 80/20 0.07 MW 0.07 MW
936371 AD2-047 C Adder 3.37 MW 2.87 MW
936461 AD2-060 C Adder 1.98 MW 1.69 MW
936511 AD2-066 C Adder 6.68 MW 5.68 MW
942421 AE2-255 C Adder 2.38 MW 2.02 MW
942521 AE2-267 C Adder -3.0 MW -2.55 MW
942601 AE2-276 C 80/20 8.44 MW 8.44 MW
942651 AE2-281 C Adder 0.67 MW 0.57 MW
943121 AE2-341 C Adder 9.74 MW 8.28 MW
943591 AF1-030 C Adder 6.48 MW 5.5 MW
945391 AF1-204 C 80/20 6.56 MW 6.56 MW
945421 AF1-207 C 80/20 4.53 MW 4.53 MW
945501 AF1-215 C 80/20 3.31 MW 3.31 MW
959141 AF2-205 C 80/20 15.2 MW 15.2 MW
960591 AF2-350 C Adder 5.95 MW 5.06 MW
961501 AF2-441 C Adder 8.0 MW 6.8 MW
930461 AB1-087 C 80/20 14.7 MW 14.7 MW
930471 AB1-088 C 80/20 14.47 MW 14.47 MW
939321 AE1-163 C Adder 4.68 MW 3.98 MW
939351 AE1-166 C Adder 7.74 MW 6.58 MW
939391 AE1-170 C Adder 5.94 MW 5.05 MW
939401 AE1-172 C Adder 4.41 MW 3.75 MW
939741 AE1-205 C Adder 8.1 MW 6.89 MW
940581 AE2-045 C 80/20 10.82 MW 10.82 MW
962691 AG1-118 C Adder 17.08 MW 14.52 MW
963741 AG1-226 C 80/20 16.97 MW 16.97 MW
963841 AG1-237 C 80/20 3.23 MW 3.23 MW
964401 AG1-302 C 80/20 22.18 MW 22.18 MW
941551 AE2-152 C Adder 8.94 MW 7.59 MW
941731 AE2-173 C Adder 4.82 MW 4.1 MW
957371 AF2-031 C Adder 0.8 MW 0.68 MW
957841 AF2-078 C 80/20 16.0 MW 16.0 MW
958011 AF2-095 C Adder 8.57 MW 7.29 MW
958381 AF2-132 C 80/20 22.18 MW 22.18 MW
958391 AF2-133 C 80/20 22.59 MW 22.59 MW
958401 AF2-134 C 80/20 1.1 MW 1.1 MW
964861 AG1-349 C 80/20 19.34 MW 19.34 MW
965791 AG1-447 C 80/20 5.73 MW 5.73 MW
274751 CRETE EC ;1U 80/20 1.24 MW 1.24 MW
274770 LINCOLN ;1U 80/20 1.26 MW 1.26 MW
957141 AF2-008 FTIR 80/20 84.36 MW 84.36 MW
944201 AF1-088 FTIR 80/20 168.72 MW 168.72 MW
990742 J1381 External Queue 20.02 MW 20.02 MW
991112 J1481 External Queue 20.02 MW 20.02 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 114.41 MW 114.41 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 18.27 MW 18.27 MW
NY PJM->LTFIMP_NY CLTF 1.03 MW 1.03 MW
WEC LTFEXP_WEC->PJM CLTF 3.02 MW 3.02 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 1.29 MW 1.29 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.79 MW 0.79 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 10.29 MW 10.29 MW
MEC LTFEXP_MEC->PJM CLTF 11.45 MW 11.45 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 29.46 MW 29.46 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.75 MW 1.75 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.71 MW 1.71 MW

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/NIPS
Facility Description:
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
Contingency Name:
Base Case
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 113.67 %
Rating: 1075.0 MVA
Rating Type: A
MVA to Mitigate: 1221.92 MVA
MW Contribution: 14.21 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 4.49 MW 3.82 MW
965091 AG1-374 C Adder 11.24 MW 9.55 MW
966091 AG1-478 C Adder 1.47 MW 1.25 MW
966431 AG1-512 C Adder 1.23 MW 1.05 MW
966441 AG1-513 C Adder 0.33 MW 0.28 MW
933911 AD1-013 C Adder 1.19 MW 1.01 MW
942111 AE2-223 C Adder 1.27 MW 1.08 MW
942991 AE2-321 C Adder 5.31 MW 4.52 MW
958481 AF2-142 C Adder 7.83 MW 6.65 MW
958491 AF2-143 C Adder 7.58 MW 6.45 MW
959081 AF2-199 C Adder 4.61 MW 3.92 MW
959341 AF2-225 C Adder 4.11 MW 3.49 MW
959351 AF2-226 C Adder 1.81 MW 1.53 MW
959611 AF2-252 C Adder 1.25 MW 1.06 MW
960281 AF2-319 C Adder 1.81 MW 1.53 MW
960611 AF2-352 C Adder 1.25 MW 1.06 MW
960751 AF2-366 C Adder 4.48 MW 3.81 MW
274675 JOLIET 29;7U Adder 49.94 MW 42.45 MW
274676 JOLIET 29;8U Adder 49.95 MW 42.46 MW
274682 WAUKEGAN ;7U Adder 27.29 MW 23.2 MW
274683 WAUKEGAN ;8U Adder 29.42 MW 25.01 MW
274687 WILL CNTY;4U Adder 48.59 MW 41.3 MW
274723 RIVER EC ;12 80/20 3.9 MW 3.9 MW
274724 RIVER EC ;11 80/20 3.9 MW 3.9 MW
274752 CRETE EC ;2U 80/20 1.46 MW 1.46 MW
274753 CRETE EC ;3U 80/20 1.46 MW 1.46 MW
274754 CRETE EC ;4U 80/20 1.46 MW 1.46 MW
274788 SE CHICAG;5U 80/20 5.54 MW 5.54 MW
274789 SE CHICAG;6U 80/20 5.54 MW 5.54 MW
274790 SE CHICAG;7U 80/20 5.54 MW 5.54 MW
274791 SE CHICAG;8U 80/20 5.54 MW 5.54 MW
274792 SE CHICAG;9U 80/20 5.46 MW 5.46 MW
274793 SE CHICAG;0U 80/20 5.46 MW 5.46 MW
274794 SE CHICAG;1U 80/20 5.46 MW 5.46 MW
274795 SE CHICAG;2U 80/20 5.46 MW 5.46 MW
274799 UNIV PARK;2U 80/20 0.92 MW 0.92 MW
274800 UNIV PARK;3U 80/20 0.92 MW 0.92 MW
274801 UNIV PARK;4U 80/20 0.92 MW 0.92 MW
274826 FISK ;BP 80/20 1.77 MW 1.77 MW
274827 FISK ;RP 80/20 1.25 MW 1.25 MW
274887 PILOT HIL;1U 80/20 0.57 MW 0.57 MW
274888 KELLY CRK;1U 80/20 0.57 MW 0.57 MW
276164 X3-005 C 80/20 0.07 MW 0.07 MW
933411 AC2-154 C 80/20 1.9 MW 1.9 MW
939061 AE1-134 2 Adder 0.89 MW 0.76 MW
957331 AF2-027 C Adder 1.65 MW 1.4 MW
957471 AF2-041 C Adder 13.84 MW 11.77 MW
274674 JOLIET 9 ;6U Adder 25.73 MW 21.87 MW
938851 AE1-113 C Adder 5.43 MW 4.61 MW
934101 AD2-000 1 Adder 3.69 MW 3.14 MW
934111 AD2-000 2 Adder 4.08 MW 3.47 MW
957751 AF2-069 C Adder 0.14 MW 0.12 MW
926821 AC1-168 C Adder 0.75 MW 0.64 MW
934051 AD1-031 C Adder 1.9 MW 1.61 MW
936371 AD2-047 C 80/20 3.4 MW 3.4 MW
936461 AD2-060 C 80/20 2.0 MW 2.0 MW
936511 AD2-066 C Adder 5.68 MW 4.83 MW
942421 AE2-255 C Adder 2.06 MW 1.75 MW
942651 AE2-281 C Adder 0.59 MW 0.5 MW
943121 AE2-341 C Adder 8.0 MW 6.8 MW
943591 AF1-030 C Adder 5.32 MW 4.52 MW
959091 AF2-200 C Adder 9.23 MW 7.84 MW
960591 AF2-350 C 80/20 6.0 MW 6.0 MW
961011 AF2-392 C Adder 2.59 MW 2.2 MW
961501 AF2-441 C 80/20 10.92 MW 10.92 MW
930481 AB1-089 C Adder 42.63 MW 36.23 MW
938861 AE1-114 C Adder 2.56 MW 2.18 MW
939321 AE1-163 C Adder 4.13 MW 3.51 MW
939351 AE1-166 C Adder 6.77 MW 5.76 MW
939401 AE1-172 C Adder 3.55 MW 3.02 MW
939741 AE1-205 C Adder 5.48 MW 4.66 MW
946321 AF1-296 C Adder 2.34 MW 1.99 MW
946671 AF1-331 C Adder 1.54 MW 1.31 MW
962691 AG1-118 C Adder 14.21 MW 12.08 MW
941551 AE2-152 C Adder 7.81 MW 6.64 MW
941731 AE2-173 C Adder 3.26 MW 2.77 MW
957371 AF2-031 C 80/20 1.18 MW 1.18 MW
958011 AF2-095 C 80/20 8.64 MW 8.64 MW
965931 AG1-462 C Adder 10.55 MW 8.97 MW
274798 UNIV PARK;1U 80/20 0.92 MW 0.92 MW
274751 CRETE EC ;1U 80/20 1.46 MW 1.46 MW
955742 J1058 G External Queue 34.26 MW 34.26 MW
990547 J1333 G External Queue 40.55 MW 40.55 MW
990552 J1334 G External Queue 40.55 MW 40.55 MW
990557 J1335 G External Queue 40.55 MW 40.55 MW
990562 J1336 G External Queue 40.55 MW 40.55 MW
990577 J1339 External Queue 26.7 MW 26.7 MW
990582 J1340 External Queue 26.7 MW 26.7 MW
990647 J1355 External Queue 45.41 MW 45.41 MW
990662 J1358 External Queue 15.69 MW 15.69 MW
990762 J1386 External Queue 12.27 MW 12.27 MW
991247 J1684 G External Queue 33.69 MW 33.69 MW
991332 J1785 External Queue 15.42 MW 15.42 MW
991337 J1802 External Queue 11.4 MW 11.4 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 75.74 MW 75.74 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.86 MW 11.86 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.75 MW 0.75 MW
WEC LTFEXP_WEC->PJM CLTF 2.58 MW 2.58 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.3 MW 0.3 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.15 MW 0.15 MW
TVA LTFEXP_TVA->PJM CLTF 1.17 MW 1.17 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.23 MW 0.23 MW
MEC LTFEXP_MEC->PJM CLTF 8.77 MW 8.77 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.61 MW 0.61 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.68 MW 2.68 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.05 MW 0.05 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.45 MW 0.45 MW

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE/NIPS
Facility Description:
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
Contingency Name:
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 106.66 %
Rating: 1399.0 MVA
Rating Type: B
MVA to Mitigate: 1492.13 MVA
MW Contribution: 22.69 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 7.17 MW 6.09 MW
965091 AG1-374 C Adder 16.39 MW 13.93 MW
966091 AG1-478 C Adder 2.01 MW 1.71 MW
966431 AG1-512 C Adder 1.62 MW 1.37 MW
966441 AG1-513 C Adder 0.52 MW 0.44 MW
933911 AD1-013 C Adder 1.88 MW 1.6 MW
934721 AD1-100 C 80/20 3.01 MW 3.01 MW
937401 AD2-194 1 80/20 1.31 MW 1.31 MW
937411 AD2-194 2 80/20 1.31 MW 1.31 MW
942111 AE2-223 C Adder 1.87 MW 1.59 MW
942991 AE2-321 C Adder 8.38 MW 7.12 MW
958481 AF2-142 C Adder 10.87 MW 9.24 MW
958491 AF2-143 C Adder 10.8 MW 9.18 MW
959081 AF2-199 C Adder 7.31 MW 6.21 MW
959341 AF2-225 C Adder 6.04 MW 5.13 MW
959351 AF2-226 C 80/20 2.95 MW 2.95 MW
959611 AF2-252 C Adder 1.82 MW 1.55 MW
960281 AF2-319 C 80/20 2.95 MW 2.95 MW
960611 AF2-352 C Adder 1.82 MW 1.55 MW
960751 AF2-366 C Adder 7.15 MW 6.08 MW
274654 BRAIDWOOD;1U 80/20 27.63 MW 27.63 MW
274655 BRAIDWOOD;2U 80/20 26.88 MW 26.88 MW
274658 DRESDEN ;2U 80/20 20.0 MW 20.0 MW
274660 LASCO STA;1U 80/20 25.49 MW 25.49 MW
274661 LASCO STA;2U 80/20 25.58 MW 25.58 MW
274675 JOLIET 29;7U 80/20 76.19 MW 76.19 MW
274676 JOLIET 29;8U 80/20 76.23 MW 76.23 MW
274682 WAUKEGAN ;7U Adder 42.6 MW 36.21 MW
274683 WAUKEGAN ;8U Adder 45.92 MW 39.03 MW
274687 WILL CNTY;4U 80/20 71.93 MW 71.93 MW
274728 ELWOOD EC;5P 80/20 3.36 MW 3.36 MW
274729 ELWOOD EC;1P 80/20 3.36 MW 3.36 MW
274730 ELWOOD EC;6P 80/20 3.36 MW 3.36 MW
274731 ELWOOD EC;2P 80/20 3.36 MW 3.36 MW
274732 ELWOOD EC;7P 80/20 3.36 MW 3.36 MW
274733 ELWOOD EC;3P 80/20 3.36 MW 3.36 MW
274734 ELWOOD EC;8P 80/20 3.36 MW 3.36 MW
274735 ELWOOD EC;4P 80/20 3.36 MW 3.36 MW
274736 ELWOOD EC;9P 80/20 3.36 MW 3.36 MW
274737 AURORA EC;1P 80/20 3.56 MW 3.56 MW
274739 AURORA EC;2P 80/20 3.56 MW 3.56 MW
274743 AURORA EC;7P 80/20 1.08 MW 1.08 MW
274752 CRETE EC ;2U 80/20 6.11 MW 6.11 MW
274753 CRETE EC ;3U 80/20 6.11 MW 6.11 MW
274754 CRETE EC ;4U 80/20 6.11 MW 6.11 MW
274847 GR RIDGE ;BU 80/20 0.6 MW 0.6 MW
274861 TOP CROP ;1U 80/20 0.44 MW 0.44 MW
274862 TOP CROP ;2U 80/20 0.84 MW 0.84 MW
274871 GR RIDGE ;2U 80/20 0.22 MW 0.22 MW
933411 AC2-154 C Adder 2.25 MW 1.91 MW
939061 AE1-134 2 Adder 1.4 MW 1.19 MW
957331 AF2-027 C Adder 2.57 MW 2.19 MW
957471 AF2-041 C Adder 21.92 MW 18.63 MW
274674 JOLIET 9 ;6U Adder 35.31 MW 30.02 MW
938851 AE1-113 C Adder 8.31 MW 7.07 MW
934101 AD2-000 1 80/20 5.89 MW 5.89 MW
934111 AD2-000 2 80/20 6.31 MW 6.31 MW
274704 KENDALL ;1C 80/20 4.14 MW 4.14 MW
274705 KENDALL ;1S 80/20 2.77 MW 2.77 MW
274706 KENDALL ;2C 80/20 4.14 MW 4.14 MW
274707 KENDALL ;2S 80/20 2.77 MW 2.77 MW
274708 KENDALL ;3C 80/20 3.92 MW 3.92 MW
274709 KENDALL ;3S 80/20 2.59 MW 2.59 MW
274710 KENDALL ;4C 80/20 3.88 MW 3.88 MW
274711 KENDALL ;4S 80/20 2.59 MW 2.59 MW
276640 AC1-204 GEN1 80/20 12.49 MW 12.49 MW
276642 AC1-204 GEN2 80/20 12.51 MW 12.51 MW
276658 AB1-122 CT1 80/20 11.86 MW 11.86 MW
276660 AB1-122 CT2 80/20 12.71 MW 12.71 MW
957751 AF2-069 C Adder 0.22 MW 0.19 MW
926821 AC1-168 C Adder 1.16 MW 0.99 MW
934051 AD1-031 C Adder 2.9 MW 2.46 MW
936371 AD2-047 C Adder 4.03 MW 3.42 MW
936461 AD2-060 C Adder 2.37 MW 2.01 MW
936511 AD2-066 C Adder 8.51 MW 7.24 MW
942421 AE2-255 C Adder 3.15 MW 2.68 MW
942651 AE2-281 C Adder 0.84 MW 0.71 MW
943121 AE2-341 C Adder 13.04 MW 11.08 MW
943591 AF1-030 C Adder 8.67 MW 7.37 MW
959091 AF2-200 C Adder 14.62 MW 12.42 MW
960591 AF2-350 C Adder 7.11 MW 6.04 MW
961011 AF2-392 C Adder 4.05 MW 3.44 MW
961501 AF2-441 C Adder 6.67 MW 5.67 MW
930481 AB1-089 C Adder 67.21 MW 57.13 MW
938861 AE1-114 C Adder 4.01 MW 3.41 MW
939321 AE1-163 C Adder 5.88 MW 5.0 MW
939351 AE1-166 C 80/20 10.22 MW 10.22 MW
939401 AE1-172 C Adder 5.34 MW 4.54 MW
939741 AE1-205 C Adder 8.05 MW 6.84 MW
946321 AF1-296 C Adder 3.62 MW 3.08 MW
946671 AF1-331 C Adder 2.45 MW 2.08 MW
962691 AG1-118 C Adder 22.69 MW 19.29 MW
941551 AE2-152 C 80/20 11.8 MW 11.8 MW
941731 AE2-173 C Adder 4.79 MW 4.07 MW
958011 AF2-095 C Adder 10.24 MW 8.7 MW
965931 AG1-462 C Adder 16.29 MW 13.85 MW
274751 CRETE EC ;1U 80/20 6.11 MW 6.11 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 80.26 MW 80.26 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 13.41 MW 13.41 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.15 MW 1.15 MW
WEC LTFEXP_WEC->PJM CLTF 4.01 MW 4.01 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.58 MW 0.58 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.11 MW 1.11 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.7 MW 0.7 MW
MEC LTFEXP_MEC->PJM CLTF 13.15 MW 13.15 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.07 MW 2.07 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.28 MW 3.28 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.83 MW 0.83 MW

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE/NIPS
Facility Description:
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
Contingency Name:
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 106.66 %
Rating: 1399.0 MVA
Rating Type: B
MVA to Mitigate: 1492.1 MVA
MW Contribution: 22.69 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 7.17 MW 6.09 MW
965091 AG1-374 C Adder 16.39 MW 13.93 MW
966091 AG1-478 C Adder 2.01 MW 1.71 MW
966431 AG1-512 C Adder 1.62 MW 1.37 MW
966441 AG1-513 C Adder 0.52 MW 0.44 MW
933911 AD1-013 C Adder 1.88 MW 1.6 MW
934721 AD1-100 C 80/20 3.01 MW 3.01 MW
937401 AD2-194 1 80/20 1.31 MW 1.31 MW
937411 AD2-194 2 80/20 1.31 MW 1.31 MW
942111 AE2-223 C Adder 1.87 MW 1.59 MW
942991 AE2-321 C Adder 8.38 MW 7.12 MW
958481 AF2-142 C Adder 10.87 MW 9.24 MW
958491 AF2-143 C Adder 10.8 MW 9.18 MW
959081 AF2-199 C Adder 7.31 MW 6.21 MW
959341 AF2-225 C Adder 6.04 MW 5.13 MW
959351 AF2-226 C 80/20 2.95 MW 2.95 MW
959611 AF2-252 C Adder 1.82 MW 1.55 MW
960281 AF2-319 C 80/20 2.95 MW 2.95 MW
960611 AF2-352 C Adder 1.82 MW 1.55 MW
960751 AF2-366 C Adder 7.15 MW 6.08 MW
274654 BRAIDWOOD;1U 80/20 27.63 MW 27.63 MW
274655 BRAIDWOOD;2U 80/20 26.88 MW 26.88 MW
274658 DRESDEN ;2U 80/20 20.0 MW 20.0 MW
274660 LASCO STA;1U 80/20 25.49 MW 25.49 MW
274661 LASCO STA;2U 80/20 25.58 MW 25.58 MW
274675 JOLIET 29;7U 80/20 76.19 MW 76.19 MW
274676 JOLIET 29;8U 80/20 76.23 MW 76.23 MW
274682 WAUKEGAN ;7U Adder 42.6 MW 36.21 MW
274683 WAUKEGAN ;8U Adder 45.92 MW 39.03 MW
274687 WILL CNTY;4U 80/20 71.93 MW 71.93 MW
274728 ELWOOD EC;5P 80/20 3.36 MW 3.36 MW
274729 ELWOOD EC;1P 80/20 3.36 MW 3.36 MW
274730 ELWOOD EC;6P 80/20 3.36 MW 3.36 MW
274731 ELWOOD EC;2P 80/20 3.36 MW 3.36 MW
274732 ELWOOD EC;7P 80/20 3.36 MW 3.36 MW
274733 ELWOOD EC;3P 80/20 3.36 MW 3.36 MW
274734 ELWOOD EC;8P 80/20 3.36 MW 3.36 MW
274735 ELWOOD EC;4P 80/20 3.36 MW 3.36 MW
274736 ELWOOD EC;9P 80/20 3.36 MW 3.36 MW
274737 AURORA EC;1P 80/20 3.56 MW 3.56 MW
274739 AURORA EC;2P 80/20 3.56 MW 3.56 MW
274743 AURORA EC;7P 80/20 1.08 MW 1.08 MW
274752 CRETE EC ;2U 80/20 6.11 MW 6.11 MW
274753 CRETE EC ;3U 80/20 6.11 MW 6.11 MW
274754 CRETE EC ;4U 80/20 6.11 MW 6.11 MW
274847 GR RIDGE ;BU 80/20 0.6 MW 0.6 MW
274861 TOP CROP ;1U 80/20 0.44 MW 0.44 MW
274862 TOP CROP ;2U 80/20 0.84 MW 0.84 MW
274871 GR RIDGE ;2U 80/20 0.22 MW 0.22 MW
933411 AC2-154 C Adder 2.25 MW 1.91 MW
939061 AE1-134 2 Adder 1.4 MW 1.19 MW
957331 AF2-027 C Adder 2.57 MW 2.19 MW
957471 AF2-041 C Adder 21.92 MW 18.63 MW
274674 JOLIET 9 ;6U Adder 35.31 MW 30.02 MW
938851 AE1-113 C Adder 8.31 MW 7.07 MW
934101 AD2-000 1 80/20 5.89 MW 5.89 MW
934111 AD2-000 2 80/20 6.31 MW 6.31 MW
274704 KENDALL ;1C 80/20 4.14 MW 4.14 MW
274705 KENDALL ;1S 80/20 2.77 MW 2.77 MW
274706 KENDALL ;2C 80/20 4.14 MW 4.14 MW
274707 KENDALL ;2S 80/20 2.77 MW 2.77 MW
274708 KENDALL ;3C 80/20 3.92 MW 3.92 MW
274709 KENDALL ;3S 80/20 2.59 MW 2.59 MW
274710 KENDALL ;4C 80/20 3.88 MW 3.88 MW
274711 KENDALL ;4S 80/20 2.59 MW 2.59 MW
276640 AC1-204 GEN1 80/20 12.49 MW 12.49 MW
276642 AC1-204 GEN2 80/20 12.51 MW 12.51 MW
276658 AB1-122 CT1 80/20 11.86 MW 11.86 MW
276660 AB1-122 CT2 80/20 12.71 MW 12.71 MW
957751 AF2-069 C Adder 0.22 MW 0.19 MW
926821 AC1-168 C Adder 1.16 MW 0.99 MW
934051 AD1-031 C Adder 2.9 MW 2.46 MW
936371 AD2-047 C Adder 4.03 MW 3.42 MW
936461 AD2-060 C Adder 2.37 MW 2.01 MW
936511 AD2-066 C Adder 8.51 MW 7.24 MW
942421 AE2-255 C Adder 3.15 MW 2.68 MW
942651 AE2-281 C Adder 0.84 MW 0.71 MW
943121 AE2-341 C Adder 13.04 MW 11.08 MW
943591 AF1-030 C Adder 8.67 MW 7.37 MW
959091 AF2-200 C Adder 14.62 MW 12.42 MW
960591 AF2-350 C Adder 7.11 MW 6.04 MW
961011 AF2-392 C Adder 4.05 MW 3.44 MW
961501 AF2-441 C Adder 6.67 MW 5.67 MW
930481 AB1-089 C Adder 67.21 MW 57.13 MW
938861 AE1-114 C Adder 4.01 MW 3.41 MW
939321 AE1-163 C Adder 5.88 MW 5.0 MW
939351 AE1-166 C 80/20 10.22 MW 10.22 MW
939401 AE1-172 C Adder 5.34 MW 4.54 MW
939741 AE1-205 C Adder 8.05 MW 6.84 MW
946321 AF1-296 C Adder 3.62 MW 3.08 MW
946671 AF1-331 C Adder 2.45 MW 2.08 MW
962691 AG1-118 C Adder 22.69 MW 19.29 MW
941551 AE2-152 C 80/20 11.8 MW 11.8 MW
941731 AE2-173 C Adder 4.79 MW 4.07 MW
958011 AF2-095 C Adder 10.24 MW 8.7 MW
965931 AG1-462 C Adder 16.29 MW 13.85 MW
274751 CRETE EC ;1U 80/20 6.11 MW 6.11 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 80.26 MW 80.26 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 13.41 MW 13.41 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 1.15 MW 1.15 MW
WEC LTFEXP_WEC->PJM CLTF 4.01 MW 4.01 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.58 MW 0.58 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.11 MW 1.11 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.7 MW 0.7 MW
MEC LTFEXP_MEC->PJM CLTF 13.15 MW 13.15 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.07 MW 2.07 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.28 MW 3.28 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.83 MW 0.83 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 104.99 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1019.44 MVA
MW Contribution: 18.81 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.94 MW 5.05 MW
965681 AG1-436 C 80/20 63.95 MW 63.95 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966431 AG1-512 C 80/20 3.81 MW 3.81 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
958481 AF2-142 C 80/20 10.28 MW 10.28 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960681 AF2-359 C 80/20 63.95 MW 63.95 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
274654 BRAIDWOOD;1U 80/20 22.27 MW 22.27 MW
274655 BRAIDWOOD;2U 80/20 21.78 MW 21.78 MW
274660 LASCO STA;1U 80/20 20.81 MW 20.81 MW
274661 LASCO STA;2U 80/20 20.88 MW 20.88 MW
274675 JOLIET 29;7U 80/20 62.32 MW 62.32 MW
274676 JOLIET 29;8U 80/20 62.29 MW 62.29 MW
274682 WAUKEGAN ;7U Adder 35.09 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.83 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274799 UNIV PARK;2U 80/20 0.98 MW 0.98 MW
274800 UNIV PARK;3U 80/20 0.98 MW 0.98 MW
274801 UNIV PARK;4U 80/20 0.98 MW 0.98 MW
274802 UNIV PARK;5U 80/20 1.28 MW 1.28 MW
274803 UNIV PARK;6U 80/20 1.28 MW 1.28 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
939061 AE1-134 2 Adder 1.15 MW 0.98 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.32 MW
270839 OTTER CRK; R 80/20 0.36 MW 0.36 MW
274708 KENDALL ;3C 80/20 3.4 MW 3.4 MW
274709 KENDALL ;3S 80/20 2.25 MW 2.25 MW
274710 KENDALL ;4C 80/20 3.37 MW 3.37 MW
274711 KENDALL ;4S 80/20 2.25 MW 2.25 MW
276640 AC1-204 GEN1 80/20 10.16 MW 10.16 MW
276642 AC1-204 GEN2 80/20 10.15 MW 10.15 MW
274805 UNIV PK N;1U 80/20 1.91 MW 1.91 MW
274806 UNIV PK N;2U 80/20 1.89 MW 1.89 MW
274807 UNIV PK N;3U 80/20 1.93 MW 1.93 MW
274808 UNIV PK N;4U 80/20 1.92 MW 1.92 MW
274809 UNIV PK N;5U 80/20 1.9 MW 1.9 MW
274810 UNIV PK N;6U 80/20 1.92 MW 1.92 MW
274811 UNIV PK N;7U 80/20 1.93 MW 1.93 MW
274812 UNIV PK N;8U 80/20 1.91 MW 1.91 MW
274813 UNIV PK N;9U 80/20 1.91 MW 1.91 MW
274814 UNIV PK N;0U 80/20 1.9 MW 1.9 MW
274815 UNIV PK N;XU 80/20 1.91 MW 1.91 MW
274816 UNIV PK N;YU 80/20 1.93 MW 1.93 MW
926821 AC1-168 C Adder 0.96 MW 0.82 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
961011 AF2-392 C Adder 3.34 MW 2.84 MW
930481 AB1-089 C Adder 55.51 MW 47.18 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
965791 AG1-447 C 80/20 46.9 MW 46.9 MW
274798 UNIV PARK;1U 80/20 0.98 MW 0.98 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.52 MW 69.52 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.78 MW 11.78 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.52 MW 0.52 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.84 MW 2.84 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 104.99 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1019.44 MVA
MW Contribution: 18.81 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.94 MW 5.05 MW
965681 AG1-436 C 80/20 63.95 MW 63.95 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966431 AG1-512 C 80/20 3.81 MW 3.81 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
958481 AF2-142 C 80/20 10.28 MW 10.28 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960681 AF2-359 C 80/20 63.95 MW 63.95 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
274654 BRAIDWOOD;1U 80/20 22.27 MW 22.27 MW
274655 BRAIDWOOD;2U 80/20 21.78 MW 21.78 MW
274660 LASCO STA;1U 80/20 20.81 MW 20.81 MW
274661 LASCO STA;2U 80/20 20.88 MW 20.88 MW
274675 JOLIET 29;7U 80/20 62.32 MW 62.32 MW
274676 JOLIET 29;8U 80/20 62.29 MW 62.29 MW
274682 WAUKEGAN ;7U Adder 35.09 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.83 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274799 UNIV PARK;2U 80/20 0.98 MW 0.98 MW
274800 UNIV PARK;3U 80/20 0.98 MW 0.98 MW
274801 UNIV PARK;4U 80/20 0.98 MW 0.98 MW
274802 UNIV PARK;5U 80/20 1.28 MW 1.28 MW
274803 UNIV PARK;6U 80/20 1.28 MW 1.28 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
939061 AE1-134 2 Adder 1.15 MW 0.98 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.32 MW
270839 OTTER CRK; R 80/20 0.36 MW 0.36 MW
274708 KENDALL ;3C 80/20 3.4 MW 3.4 MW
274709 KENDALL ;3S 80/20 2.25 MW 2.25 MW
274710 KENDALL ;4C 80/20 3.37 MW 3.37 MW
274711 KENDALL ;4S 80/20 2.25 MW 2.25 MW
276640 AC1-204 GEN1 80/20 10.16 MW 10.16 MW
276642 AC1-204 GEN2 80/20 10.15 MW 10.15 MW
274805 UNIV PK N;1U 80/20 1.91 MW 1.91 MW
274806 UNIV PK N;2U 80/20 1.89 MW 1.89 MW
274807 UNIV PK N;3U 80/20 1.93 MW 1.93 MW
274808 UNIV PK N;4U 80/20 1.92 MW 1.92 MW
274809 UNIV PK N;5U 80/20 1.9 MW 1.9 MW
274810 UNIV PK N;6U 80/20 1.92 MW 1.92 MW
274811 UNIV PK N;7U 80/20 1.93 MW 1.93 MW
274812 UNIV PK N;8U 80/20 1.91 MW 1.91 MW
274813 UNIV PK N;9U 80/20 1.91 MW 1.91 MW
274814 UNIV PK N;0U 80/20 1.9 MW 1.9 MW
274815 UNIV PK N;XU 80/20 1.91 MW 1.91 MW
274816 UNIV PK N;YU 80/20 1.93 MW 1.93 MW
926821 AC1-168 C Adder 0.96 MW 0.82 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
961011 AF2-392 C Adder 3.34 MW 2.84 MW
930481 AB1-089 C Adder 55.51 MW 47.18 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
965791 AG1-447 C 80/20 46.9 MW 46.9 MW
274798 UNIV PARK;1U 80/20 0.98 MW 0.98 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.52 MW 69.52 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.78 MW 11.78 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.52 MW 0.52 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.84 MW 2.84 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o AEP_P4_#2978_05DUMONT 765_B_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 150.27 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1459.09 MVA
MW Contribution: 31.12 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.21 MW 1.88 MW
962781 AG1-127 C Adder 5.9 MW 5.01 MW
962782 AG1-127 E Adder 3.92 MW 3.34 MW
965681 AG1-436 C 50/50 63.75 MW 63.75 MW
965682 AG1-436 E 50/50 42.5 MW 42.5 MW
966091 AG1-478 C Adder 1.76 MW 1.49 MW
966092 AG1-478 E Adder 0.44 MW 0.38 MW
966431 AG1-512 C Adder 3.79 MW 3.22 MW
966432 AG1-512 E Adder 5.69 MW 4.83 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
966442 AG1-513 E Adder 0.64 MW 0.55 MW
290021 O50 E Adder 16.24 MW 13.81 MW
290051 GSG-6; E Adder 8.81 MW 7.49 MW
295109 WESTBROOK E Adder 4.72 MW 4.01 MW
295111 SUBLETTE E Adder 2.29 MW 1.95 MW
918052 AA1-018 E OP Adder 14.8 MW 12.58 MW
933911 AD1-013 C Adder 1.55 MW 1.32 MW
933912 AD1-013 E Adder 2.48 MW 2.11 MW
934722 AD1-100 E Adder 76.16 MW 64.74 MW
937002 AD2-134 E Adder 8.52 MW 7.24 MW
937312 AD2-172 E Adder 2.85 MW 2.42 MW
942991 AE2-321 C Adder 6.87 MW 5.84 MW
942992 AE2-321 E Adder 3.38 MW 2.88 MW
958481 AF2-142 C Adder 10.2 MW 8.67 MW
958482 AF2-142 E Adder 6.8 MW 5.78 MW
958491 AF2-143 C Adder 9.74 MW 8.28 MW
958492 AF2-143 E Adder 6.49 MW 5.52 MW
958912 AF2-182 E Adder 28.63 MW 24.33 MW
959081 AF2-199 C Adder 5.99 MW 5.09 MW
959082 AF2-199 E Adder 2.99 MW 2.54 MW
959351 AF2-226 C Adder 2.01 MW 1.71 MW
959352 AF2-226 E Adder 3.02 MW 2.56 MW
960281 AF2-319 C Adder 2.01 MW 1.71 MW
960282 AF2-319 E Adder 3.02 MW 2.56 MW
960582 AF2-349 E Adder 30.48 MW 25.91 MW
960681 AF2-359 C 50/50 63.75 MW 63.75 MW
960682 AF2-359 E 50/50 42.5 MW 42.5 MW
960751 AF2-366 C Adder 5.88 MW 5.0 MW
960752 AF2-366 E Adder 3.92 MW 3.33 MW
274675 JOLIET 29;7U Adder 61.79 MW 52.52 MW
274676 JOLIET 29;8U Adder 61.77 MW 52.5 MW
274682 WAUKEGAN ;7U Adder 34.82 MW 29.6 MW
274683 WAUKEGAN ;8U Adder 37.55 MW 31.91 MW
274687 WILL CNTY;4U Adder 55.58 MW 47.24 MW
274859 EASYR;U1 E Adder 10.07 MW 8.56 MW
274860 EASYR;U2 E Adder 10.07 MW 8.56 MW
276591 L-013 2 Adder 3.09 MW 2.63 MW
293061 N-015 E Adder 13.1 MW 11.14 MW
293644 O22 E1 Adder 11.55 MW 9.82 MW
293645 O22 E2 Adder 13.23 MW 11.25 MW
294392 P-010 E Adder 16.64 MW 14.14 MW
294763 P-046 E Adder 7.91 MW 6.72 MW
933411 AC2-154 C Adder 2.1 MW 1.79 MW
933412 AC2-154 E Adder 3.43 MW 2.92 MW
940502 AE2-035 E Adder 2.85 MW 2.42 MW
957331 AF2-027 C Adder 2.1 MW 1.79 MW
957332 AF2-027 E Adder 3.16 MW 2.68 MW
957471 AF2-041 C Adder 17.96 MW 15.26 MW
957472 AF2-041 E Adder 8.98 MW 7.63 MW
274674 JOLIET 9 ;6U Adder 31.03 MW 26.38 MW
274890 CAYUG;1U E Adder 3.17 MW 2.7 MW
938851 AE1-113 C Adder 6.7 MW 5.7 MW
938852 AE1-113 E Adder 23.76 MW 20.19 MW
934101 AD2-000 1 Adder 4.88 MW 4.15 MW
934111 AD2-000 2 Adder 5.05 MW 4.29 MW
275149 KELLYCK ;1E Adder 15.49 MW 13.16 MW
293519 PILOT HIL;1E Adder 15.49 MW 13.16 MW
290108 LEEDK;1U E Adder 20.22 MW 17.18 MW
916221 Z1-073 E Adder 6.21 MW 5.28 MW
274805 UNIV PK N;1U 50/50 1.9 MW 1.9 MW
274807 UNIV PK N;3U 50/50 1.92 MW 1.92 MW
274808 UNIV PK N;4U 50/50 1.91 MW 1.91 MW
274810 UNIV PK N;6U 50/50 1.91 MW 1.91 MW
274811 UNIV PK N;7U 50/50 1.92 MW 1.92 MW
274812 UNIV PK N;8U 50/50 1.9 MW 1.9 MW
274813 UNIV PK N;9U 50/50 1.9 MW 1.9 MW
274814 UNIV PK N;0U 50/50 1.89 MW 1.89 MW
274815 UNIV PK N;XU 50/50 1.9 MW 1.9 MW
274816 UNIV PK N;YU 50/50 1.92 MW 1.92 MW
936292 AD2-038 E Adder 13.38 MW 11.37 MW
936371 AD2-047 C Adder 3.76 MW 3.2 MW
936372 AD2-047 E Adder 18.37 MW 15.61 MW
936461 AD2-060 C Adder 2.21 MW 1.88 MW
936511 AD2-066 C Adder 7.13 MW 6.06 MW
936512 AD2-066 E Adder 4.75 MW 4.04 MW
942421 AE2-255 C Adder 2.54 MW 2.16 MW
942422 AE2-255 E Adder 7.61 MW 6.47 MW
942651 AE2-281 C Adder 0.76 MW 0.64 MW
942652 AE2-281 E Adder 4.65 MW 3.96 MW
943121 AE2-341 C Adder 10.77 MW 9.16 MW
943122 AE2-341 E Adder 5.29 MW 4.5 MW
943591 AF1-030 C Adder 7.16 MW 6.09 MW
943592 AF1-030 E Adder 3.54 MW 3.01 MW
959091 AF2-200 C Adder 11.97 MW 10.18 MW
959092 AF2-200 E Adder 7.98 MW 6.78 MW
960591 AF2-350 C Adder 6.64 MW 5.64 MW
960592 AF2-350 E Adder 4.42 MW 3.76 MW
930481 AB1-089 C Adder 55.14 MW 46.87 MW
930482 AB1-089 E Adder 2.51 MW 2.13 MW
938861 AE1-114 C Adder 3.3 MW 2.8 MW
938862 AE1-114 E Adder 11.24 MW 9.56 MW
939321 AE1-163 C Adder 5.3 MW 4.51 MW
939322 AE1-163 E Adder 32.57 MW 27.69 MW
939351 AE1-166 C Adder 8.49 MW 7.21 MW
939352 AE1-166 E Adder 7.83 MW 6.66 MW
939401 AE1-172 C Adder 4.45 MW 3.78 MW
939402 AE1-172 E Adder 20.84 MW 17.71 MW
946152 AF1-280 E Adder 19.08 MW 16.22 MW
946671 AF1-331 C Adder 2.01 MW 1.71 MW
962691 AG1-118 C Adder 18.68 MW 15.87 MW
962692 AG1-118 E Adder 12.45 MW 10.58 MW
941551 AE2-152 C Adder 9.79 MW 8.32 MW
941552 AE2-152 E Adder 6.53 MW 5.55 MW
958011 AF2-095 C Adder 9.56 MW 8.12 MW
958012 AF2-095 E Adder 6.37 MW 5.42 MW
965791 AG1-447 C 50/50 46.75 MW 46.75 MW
276675 AE2-062 E Adder 0.13 MW 0.11 MW
276170 Z1-108 E Adder 2.47 MW 2.1 MW
920272 AA2-123 E Adder 2.42 MW 2.06 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 68.23 MW 68.23 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 12.47 MW 12.47 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.73 MW 1.73 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.29 MW 3.29 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.41 MW 0.41 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.21 MW 0.21 MW
TVA LTFEXP_TVA->PJM CLTF 1.17 MW 1.17 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.41 MW 0.41 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.17 MW 1.17 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.99 MW 2.99 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 11.09 MW 11.09 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.61 MW 0.61 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT3-4___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 150.19 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1458.35 MVA
MW Contribution: 31.36 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.23 MW 1.9 MW
962781 AG1-127 C Adder 5.94 MW 5.05 MW
962782 AG1-127 E Adder 3.95 MW 3.36 MW
965681 AG1-436 C 50/50 63.95 MW 63.95 MW
965682 AG1-436 E 50/50 42.63 MW 42.63 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966092 AG1-478 E Adder 0.44 MW 0.38 MW
966431 AG1-512 C Adder 3.81 MW 3.24 MW
966432 AG1-512 E Adder 5.72 MW 4.86 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
966442 AG1-513 E Adder 0.65 MW 0.55 MW
290021 O50 E Adder 16.36 MW 13.9 MW
290051 GSG-6; E Adder 8.87 MW 7.54 MW
295109 WESTBROOK E Adder 4.75 MW 4.04 MW
295111 SUBLETTE E Adder 2.31 MW 1.96 MW
910542 X3-005 E Adder 0.54 MW 0.46 MW
918052 AA1-018 E OP Adder 14.9 MW 12.67 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
933912 AD1-013 E Adder 2.49 MW 2.12 MW
934722 AD1-100 E Adder 76.78 MW 65.27 MW
937002 AD2-134 E Adder 8.58 MW 7.29 MW
937312 AD2-172 E Adder 2.86 MW 2.44 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
942992 AE2-321 E Adder 3.41 MW 2.9 MW
958481 AF2-142 C Adder 10.28 MW 8.74 MW
958482 AF2-142 E Adder 6.85 MW 5.82 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
958492 AF2-143 E Adder 6.54 MW 5.56 MW
958912 AF2-182 E Adder 28.8 MW 24.48 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959082 AF2-199 E Adder 3.01 MW 2.56 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
959352 AF2-226 E Adder 3.04 MW 2.58 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960282 AF2-319 E Adder 3.04 MW 2.58 MW
960582 AF2-349 E Adder 30.7 MW 26.09 MW
960681 AF2-359 C 50/50 63.95 MW 63.95 MW
960682 AF2-359 E 50/50 42.63 MW 42.63 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
960752 AF2-366 E Adder 3.95 MW 3.36 MW
274675 JOLIET 29;7U Adder 62.32 MW 52.97 MW
274676 JOLIET 29;8U Adder 62.3 MW 52.95 MW
274682 WAUKEGAN ;7U Adder 35.1 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.84 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274859 EASYR;U1 E Adder 10.13 MW 8.61 MW
274860 EASYR;U2 E Adder 10.13 MW 8.61 MW
276591 L-013 2 Adder 3.12 MW 2.65 MW
293061 N-015 E Adder 13.2 MW 11.22 MW
293644 O22 E1 Adder 11.65 MW 9.9 MW
293645 O22 E2 Adder 13.34 MW 11.34 MW
294392 P-010 E Adder 16.77 MW 14.25 MW
294763 P-046 E Adder 7.96 MW 6.77 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
933412 AC2-154 E Adder 3.46 MW 2.94 MW
940502 AE2-035 E Adder 2.86 MW 2.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957332 AF2-027 E Adder 3.18 MW 2.71 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
957472 AF2-041 E Adder 9.04 MW 7.68 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
274891 CAYUG;2U E Adder 2.65 MW 2.26 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
938852 AE1-113 E Adder 23.92 MW 20.33 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.33 MW
275149 KELLYCK ;1E Adder 15.63 MW 13.29 MW
293519 PILOT HIL;1E Adder 15.63 MW 13.29 MW
290108 LEEDK;1U E Adder 20.36 MW 17.31 MW
916221 Z1-073 E Adder 6.25 MW 5.31 MW
274805 UNIV PK N;1U 50/50 1.91 MW 1.91 MW
274807 UNIV PK N;3U 50/50 1.93 MW 1.93 MW
274808 UNIV PK N;4U 50/50 1.92 MW 1.92 MW
274810 UNIV PK N;6U 50/50 1.92 MW 1.92 MW
274811 UNIV PK N;7U 50/50 1.93 MW 1.93 MW
274812 UNIV PK N;8U 50/50 1.91 MW 1.91 MW
274813 UNIV PK N;9U 50/50 1.91 MW 1.91 MW
274814 UNIV PK N;0U 50/50 1.9 MW 1.9 MW
274815 UNIV PK N;XU 50/50 1.91 MW 1.91 MW
274816 UNIV PK N;YU 50/50 1.93 MW 1.93 MW
936292 AD2-038 E Adder 13.47 MW 11.45 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936372 AD2-047 E Adder 18.53 MW 15.75 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
936512 AD2-066 E Adder 4.79 MW 4.07 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942422 AE2-255 E Adder 7.67 MW 6.52 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
942652 AE2-281 E Adder 4.68 MW 3.98 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943122 AE2-341 E Adder 5.33 MW 4.53 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
943592 AF1-030 E Adder 3.57 MW 3.04 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959092 AF2-200 E Adder 8.04 MW 6.83 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960592 AF2-350 E Adder 4.47 MW 3.8 MW
930481 AB1-089 C Adder 55.52 MW 47.19 MW
930482 AB1-089 E Adder 2.52 MW 2.15 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
938862 AE1-114 E Adder 11.32 MW 9.62 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939322 AE1-163 E Adder 32.8 MW 27.88 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939352 AE1-166 E Adder 7.9 MW 6.71 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
939402 AE1-172 E Adder 20.96 MW 17.82 MW
946152 AF1-280 E Adder 19.2 MW 16.32 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962692 AG1-118 E Adder 12.54 MW 10.66 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
941552 AE2-152 E Adder 6.58 MW 5.59 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
958012 AF2-095 E Adder 6.43 MW 5.47 MW
965791 AG1-447 C 50/50 46.9 MW 46.9 MW
276675 AE2-062 E Adder 0.14 MW 0.12 MW
276170 Z1-108 E Adder 2.49 MW 2.11 MW
920272 AA2-123 E Adder 2.44 MW 2.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.53 MW 69.53 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.79 MW 11.79 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.74 MW 1.74 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.85 MW 2.85 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 11.14 MW 11.14 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT4-5___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 150.19 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1458.35 MVA
MW Contribution: 31.36 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.23 MW 1.9 MW
962781 AG1-127 C Adder 5.94 MW 5.05 MW
962782 AG1-127 E Adder 3.95 MW 3.36 MW
965681 AG1-436 C 50/50 63.95 MW 63.95 MW
965682 AG1-436 E 50/50 42.63 MW 42.63 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966092 AG1-478 E Adder 0.44 MW 0.38 MW
966431 AG1-512 C Adder 3.81 MW 3.24 MW
966432 AG1-512 E Adder 5.72 MW 4.86 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
966442 AG1-513 E Adder 0.65 MW 0.55 MW
290021 O50 E Adder 16.36 MW 13.9 MW
290051 GSG-6; E Adder 8.87 MW 7.54 MW
295109 WESTBROOK E Adder 4.75 MW 4.04 MW
295111 SUBLETTE E Adder 2.31 MW 1.96 MW
910542 X3-005 E Adder 0.54 MW 0.46 MW
918052 AA1-018 E OP Adder 14.9 MW 12.67 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
933912 AD1-013 E Adder 2.49 MW 2.12 MW
934722 AD1-100 E Adder 76.78 MW 65.27 MW
937002 AD2-134 E Adder 8.58 MW 7.29 MW
937312 AD2-172 E Adder 2.86 MW 2.44 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
942992 AE2-321 E Adder 3.41 MW 2.9 MW
958481 AF2-142 C Adder 10.28 MW 8.74 MW
958482 AF2-142 E Adder 6.85 MW 5.82 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
958492 AF2-143 E Adder 6.54 MW 5.56 MW
958912 AF2-182 E Adder 28.8 MW 24.48 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959082 AF2-199 E Adder 3.01 MW 2.56 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
959352 AF2-226 E Adder 3.04 MW 2.58 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960282 AF2-319 E Adder 3.04 MW 2.58 MW
960582 AF2-349 E Adder 30.7 MW 26.09 MW
960681 AF2-359 C 50/50 63.95 MW 63.95 MW
960682 AF2-359 E 50/50 42.63 MW 42.63 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
960752 AF2-366 E Adder 3.95 MW 3.36 MW
274675 JOLIET 29;7U Adder 62.32 MW 52.97 MW
274676 JOLIET 29;8U Adder 62.3 MW 52.95 MW
274682 WAUKEGAN ;7U Adder 35.1 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.84 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274859 EASYR;U1 E Adder 10.13 MW 8.61 MW
274860 EASYR;U2 E Adder 10.13 MW 8.61 MW
276591 L-013 2 Adder 3.12 MW 2.65 MW
293061 N-015 E Adder 13.2 MW 11.22 MW
293644 O22 E1 Adder 11.65 MW 9.9 MW
293645 O22 E2 Adder 13.34 MW 11.34 MW
294392 P-010 E Adder 16.77 MW 14.25 MW
294763 P-046 E Adder 7.96 MW 6.77 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
933412 AC2-154 E Adder 3.46 MW 2.94 MW
940502 AE2-035 E Adder 2.86 MW 2.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957332 AF2-027 E Adder 3.18 MW 2.71 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
957472 AF2-041 E Adder 9.04 MW 7.68 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
274891 CAYUG;2U E Adder 2.65 MW 2.26 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
938852 AE1-113 E Adder 23.92 MW 20.33 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.33 MW
275149 KELLYCK ;1E Adder 15.63 MW 13.29 MW
293519 PILOT HIL;1E Adder 15.63 MW 13.29 MW
290108 LEEDK;1U E Adder 20.36 MW 17.31 MW
916221 Z1-073 E Adder 6.25 MW 5.31 MW
274805 UNIV PK N;1U 50/50 1.91 MW 1.91 MW
274807 UNIV PK N;3U 50/50 1.93 MW 1.93 MW
274808 UNIV PK N;4U 50/50 1.92 MW 1.92 MW
274810 UNIV PK N;6U 50/50 1.92 MW 1.92 MW
274811 UNIV PK N;7U 50/50 1.93 MW 1.93 MW
274812 UNIV PK N;8U 50/50 1.91 MW 1.91 MW
274813 UNIV PK N;9U 50/50 1.91 MW 1.91 MW
274814 UNIV PK N;0U 50/50 1.9 MW 1.9 MW
274815 UNIV PK N;XU 50/50 1.91 MW 1.91 MW
274816 UNIV PK N;YU 50/50 1.93 MW 1.93 MW
936292 AD2-038 E Adder 13.47 MW 11.45 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936372 AD2-047 E Adder 18.53 MW 15.75 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
936512 AD2-066 E Adder 4.79 MW 4.07 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942422 AE2-255 E Adder 7.67 MW 6.52 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
942652 AE2-281 E Adder 4.68 MW 3.98 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943122 AE2-341 E Adder 5.33 MW 4.53 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
943592 AF1-030 E Adder 3.57 MW 3.04 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959092 AF2-200 E Adder 8.04 MW 6.83 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960592 AF2-350 E Adder 4.47 MW 3.8 MW
930481 AB1-089 C Adder 55.52 MW 47.19 MW
930482 AB1-089 E Adder 2.52 MW 2.15 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
938862 AE1-114 E Adder 11.32 MW 9.62 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939322 AE1-163 E Adder 32.8 MW 27.88 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939352 AE1-166 E Adder 7.9 MW 6.71 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
939402 AE1-172 E Adder 20.97 MW 17.82 MW
946152 AF1-280 E Adder 19.2 MW 16.32 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962692 AG1-118 E Adder 12.54 MW 10.66 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
941552 AE2-152 E Adder 6.58 MW 5.59 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
958012 AF2-095 E Adder 6.43 MW 5.47 MW
965791 AG1-447 C 50/50 46.9 MW 46.9 MW
276675 AE2-062 E Adder 0.14 MW 0.12 MW
276170 Z1-108 E Adder 2.49 MW 2.11 MW
920272 AA2-123 E Adder 2.44 MW 2.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.53 MW 69.53 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.79 MW 11.79 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.74 MW 1.74 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.85 MW 2.85 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 11.14 MW 11.14 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4-6_116-345-R______SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
Contingency Name:
COMED_P4-6_116-345-R______SRT-A
CONTINGENCY 'COMED_P4-6_116-345-R______SRT-A'
 DISCONNECT BUS 270767                                          /*GOODINGS ;1R 345.0
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 DISCONNECT BUS 275240                                          /*GOODINGS ;1M 138.0
 TRIP BRANCH FROM BUS 270729 TO BUS 271385 TO BUS 275351 CKT 1  /*E FRANKFO; R 345.0 - E FRANKFO; R 138.0 - E FRANKFO;3C  34.5
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 111.94 %
Rating: 2297.0 MVA
Rating Type: STE
MVA to Mitigate: 2571.36 MVA
MW Contribution: 26.52 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.97 MW 1.67 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C Adder 5.05 MW 4.29 MW
962782 AG1-127 E Adder 3.36 MW 2.86 MW
966091 AG1-478 C Adder 1.17 MW 0.99 MW
966092 AG1-478 E Adder 0.29 MW 0.25 MW
966441 AG1-513 C Adder 0.36 MW 0.31 MW
966442 AG1-513 E Adder 0.55 MW 0.47 MW
290021 O50 E Adder 25.58 MW 21.74 MW
290051 GSG-6; E Adder 7.84 MW 6.66 MW
295109 WESTBROOK E Adder 4.2 MW 3.57 MW
295111 SUBLETTE E Adder 2.04 MW 1.73 MW
918052 AA1-018 E OP Adder 19.13 MW 16.26 MW
933911 AD1-013 C Adder 1.38 MW 1.17 MW
933912 AD1-013 E Adder 2.2 MW 1.87 MW
937002 AD2-134 E Adder 7.58 MW 6.44 MW
937312 AD2-172 E Adder 2.75 MW 2.34 MW
937401 AD2-194 1 50/50 1.98 MW 1.98 MW
937411 AD2-194 2 50/50 1.99 MW 1.99 MW
942991 AE2-321 C Adder 6.56 MW 5.58 MW
942992 AE2-321 E Adder 3.23 MW 2.75 MW
958481 AF2-142 C Adder 13.2 MW 11.22 MW
958482 AF2-142 E Adder 8.8 MW 7.48 MW
958491 AF2-143 C Adder 13.35 MW 11.35 MW
958492 AF2-143 E Adder 8.9 MW 7.57 MW
958912 AF2-182 E Adder 28.1 MW 23.89 MW
959081 AF2-199 C Adder 5.75 MW 4.88 MW
959082 AF2-199 E Adder 2.87 MW 2.44 MW
959351 AF2-226 C 50/50 5.83 MW 5.83 MW
959352 AF2-226 E 50/50 8.74 MW 8.74 MW
960281 AF2-319 C 50/50 5.83 MW 5.83 MW
960282 AF2-319 E 50/50 8.74 MW 8.74 MW
960582 AF2-349 E Adder 29.27 MW 24.88 MW
960751 AF2-366 C Adder 5.04 MW 4.28 MW
960752 AF2-366 E Adder 3.36 MW 2.85 MW
274675 JOLIET 29;7U Adder 83.93 MW 71.34 MW
274676 JOLIET 29;8U Adder 84.22 MW 71.59 MW
274682 WAUKEGAN ;7U Adder 34.83 MW 29.61 MW
274683 WAUKEGAN ;8U Adder 37.5 MW 31.88 MW
274728 ELWOOD EC;5P 50/50 5.11 MW 5.11 MW
274730 ELWOOD EC;6P 50/50 5.11 MW 5.11 MW
274731 ELWOOD EC;2P 50/50 5.09 MW 5.09 MW
274732 ELWOOD EC;7P 50/50 5.11 MW 5.11 MW
274733 ELWOOD EC;3P 50/50 5.09 MW 5.09 MW
274734 ELWOOD EC;8P 50/50 5.11 MW 5.11 MW
274735 ELWOOD EC;4P 50/50 5.09 MW 5.09 MW
274736 ELWOOD EC;9P 50/50 5.11 MW 5.11 MW
274859 EASYR;U1 E Adder 9.85 MW 8.37 MW
274860 EASYR;U2 E Adder 9.85 MW 8.37 MW
274861 TOP CROP ;1U 50/50 0.87 MW 0.87 MW
274862 TOP CROP ;2U 50/50 1.67 MW 1.67 MW
276591 L-013 2 Adder 2.75 MW 2.34 MW
293644 O22 E1 50/50 33.48 MW 33.48 MW
293645 O22 E2 50/50 38.35 MW 38.35 MW
293715 O-029 E Adder 8.13 MW 6.91 MW
293716 O-029 E Adder 4.46 MW 3.79 MW
293717 O-029 E Adder 4.1 MW 3.48 MW
293771 O-035 E Adder 5.68 MW 4.83 MW
294401 BSHIL;1U E Adder 7.41 MW 6.3 MW
294410 BSHIL;2U E Adder 7.41 MW 6.3 MW
294763 P-046 E Adder 7.64 MW 6.5 MW
925582 AC1-033 E Adder 8.13 MW 6.91 MW
939061 AE1-134 2 Adder 1.13 MW 0.96 MW
940502 AE2-035 E Adder 2.75 MW 2.34 MW
957331 AF2-027 C Adder 2.1 MW 1.78 MW
957332 AF2-027 E Adder 3.15 MW 2.67 MW
957471 AF2-041 C Adder 17.24 MW 14.65 MW
957472 AF2-041 E Adder 8.62 MW 7.33 MW
938851 AE1-113 C Adder 10.55 MW 8.97 MW
938852 AE1-113 E Adder 37.41 MW 31.8 MW
934101 AD2-000 1 Adder 5.89 MW 5.0 MW
934111 AD2-000 2 Adder 7.89 MW 6.71 MW
276640 AC1-204 GEN1 50/50 18.93 MW 18.93 MW
276642 AC1-204 GEN2 50/50 19.02 MW 19.02 MW
293516 O-009 E Adder 15.72 MW 13.36 MW
916212 CRESCENT ;1U Adder 3.99 MW 3.39 MW
927208 AC1-214 E1 Adder 2.69 MW 2.29 MW
927209 AC1-214 E2 Adder 2.69 MW 2.29 MW
957751 AF2-069 C Adder 0.18 MW 0.15 MW
957752 AF2-069 E Adder 0.57 MW 0.48 MW
990901 L-005 E Adder 11.32 MW 9.62 MW
290108 LEEDK;1U E Adder 17.45 MW 14.83 MW
916221 Z1-073 E Adder 5.52 MW 4.7 MW
926821 AC1-168 C Adder 0.77 MW 0.66 MW
926822 AC1-168 E Adder 5.19 MW 4.41 MW
934051 AD1-031 C Adder 2.48 MW 2.1 MW
934052 AD1-031 E Adder 4.04 MW 3.44 MW
936292 AD2-038 E Adder 18.34 MW 15.59 MW
936511 AD2-066 C Adder 7.01 MW 5.96 MW
936512 AD2-066 E Adder 4.68 MW 3.97 MW
942421 AE2-255 C Adder 4.0 MW 3.4 MW
942422 AE2-255 E Adder 11.99 MW 10.19 MW
942651 AE2-281 C Adder 1.04 MW 0.88 MW
942652 AE2-281 E Adder 6.38 MW 5.42 MW
943121 AE2-341 C Adder 7.65 MW 6.5 MW
943122 AE2-341 E Adder 3.75 MW 3.19 MW
943591 AF1-030 C Adder 5.08 MW 4.32 MW
943592 AF1-030 E Adder 2.52 MW 2.14 MW
959091 AF2-200 C Adder 11.49 MW 9.77 MW
959092 AF2-200 E Adder 7.66 MW 6.51 MW
961011 AF2-392 C Adder 3.26 MW 2.77 MW
961012 AF2-392 E Adder 15.19 MW 12.91 MW
966822 AG1-553 E Adder 23.41 MW 19.9 MW
930481 AB1-089 C Adder 52.82 MW 44.89 MW
930482 AB1-089 E Adder 2.4 MW 2.04 MW
938861 AE1-114 C Adder 3.19 MW 2.71 MW
938862 AE1-114 E Adder 10.9 MW 9.26 MW
939321 AE1-163 C Adder 7.27 MW 6.18 MW
939322 AE1-163 E Adder 44.65 MW 37.95 MW
946152 AF1-280 E Adder 18.74 MW 15.93 MW
946321 AF1-296 C Adder 3.03 MW 2.57 MW
946322 AF1-296 E Adder 14.17 MW 12.05 MW
946671 AF1-331 C Adder 1.79 MW 1.52 MW
962691 AG1-118 C Adder 15.91 MW 13.53 MW
962692 AG1-118 E Adder 10.61 MW 9.02 MW
965931 AG1-462 C Adder 13.77 MW 11.71 MW
965932 AG1-462 E Adder 9.18 MW 7.81 MW
276170 Z1-108 E Adder 2.35 MW 2.0 MW
920272 AA2-123 E Adder 2.31 MW 1.96 MW
276626 AG1-044 E Adder 0.06 MW 0.05 MW
954983 J974 C External Queue 3.29 MW 3.29 MW
954984 J974 E External Queue 17.78 MW 17.78 MW
990547 J1333 G External Queue -23.77 MW -23.77 MW
990552 J1334 G External Queue -23.77 MW -23.77 MW
990557 J1335 G External Queue -23.77 MW -23.77 MW
990562 J1336 G External Queue -23.77 MW -23.77 MW
990577 J1339 External Queue -28.12 MW -28.12 MW
990582 J1340 External Queue -28.12 MW -28.12 MW
990647 J1355 External Queue -10.19 MW -10.19 MW
990662 J1358 External Queue -12.06 MW -12.06 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 68.2 MW 68.2 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.94 MW 11.94 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.27 MW 1.27 MW
NY PJM->LTFIMP_NY CLTF 0.69 MW 0.69 MW
WEC LTFEXP_WEC->PJM CLTF 3.28 MW 3.28 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.24 MW 0.24 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.12 MW 0.12 MW
TVA LTFEXP_TVA->PJM CLTF 1.28 MW 1.28 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.4 MW 0.4 MW
MEC LTFEXP_MEC->PJM CLTF 11.31 MW 11.31 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.15 MW 1.15 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.13 MW 3.13 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 8.14 MW 8.14 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.38 MW 0.38 MW

Details for UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT4-5___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
Contingency Name:
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 127.75 %
Rating: 970.0 MVA
Rating Type: STE
MVA to Mitigate: 1239.13 MVA
MW Contribution: 31.36 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.23 MW 1.9 MW
962781 AG1-127 C Adder 5.94 MW 5.05 MW
962782 AG1-127 E Adder 3.95 MW 3.36 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966092 AG1-478 E Adder 0.44 MW 0.38 MW
966431 AG1-512 C Adder 3.81 MW 3.24 MW
966432 AG1-512 E Adder 5.72 MW 4.86 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
966442 AG1-513 E Adder 0.65 MW 0.55 MW
290021 O50 E Adder 16.36 MW 13.9 MW
290051 GSG-6; E Adder 8.87 MW 7.54 MW
295109 WESTBROOK E Adder 4.75 MW 4.04 MW
295111 SUBLETTE E Adder 2.31 MW 1.96 MW
910542 X3-005 E Adder 0.54 MW 0.46 MW
918052 AA1-018 E OP Adder 14.9 MW 12.67 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
933912 AD1-013 E Adder 2.49 MW 2.12 MW
934722 AD1-100 E Adder 76.78 MW 65.27 MW
937002 AD2-134 E Adder 8.58 MW 7.29 MW
937312 AD2-172 E Adder 2.86 MW 2.44 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
942992 AE2-321 E Adder 3.41 MW 2.9 MW
958481 AF2-142 C Adder 10.28 MW 8.74 MW
958482 AF2-142 E Adder 6.85 MW 5.82 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
958492 AF2-143 E Adder 6.54 MW 5.56 MW
958912 AF2-182 E Adder 28.8 MW 24.48 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959082 AF2-199 E Adder 3.01 MW 2.56 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
959352 AF2-226 E Adder 3.04 MW 2.58 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960282 AF2-319 E Adder 3.04 MW 2.58 MW
960582 AF2-349 E Adder 30.7 MW 26.09 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
960752 AF2-366 E Adder 3.95 MW 3.36 MW
274675 JOLIET 29;7U Adder 62.32 MW 52.97 MW
274676 JOLIET 29;8U Adder 62.3 MW 52.95 MW
274682 WAUKEGAN ;7U Adder 35.1 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.84 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274859 EASYR;U1 E Adder 10.13 MW 8.61 MW
274860 EASYR;U2 E Adder 10.13 MW 8.61 MW
276591 L-013 2 Adder 3.12 MW 2.65 MW
293061 N-015 E Adder 13.2 MW 11.22 MW
293644 O22 E1 Adder 11.65 MW 9.9 MW
293645 O22 E2 Adder 13.34 MW 11.34 MW
294392 P-010 E Adder 16.77 MW 14.25 MW
294763 P-046 E Adder 7.96 MW 6.77 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
933412 AC2-154 E Adder 3.46 MW 2.94 MW
940502 AE2-035 E Adder 2.86 MW 2.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957332 AF2-027 E Adder 3.18 MW 2.71 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
957472 AF2-041 E Adder 9.04 MW 7.68 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
274890 CAYUG;1U E Adder 11.46 MW 9.74 MW
274891 CAYUG;2U E Adder 11.46 MW 9.74 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
938852 AE1-113 E Adder 23.92 MW 20.33 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.33 MW
275149 KELLYCK ;1E Adder 15.63 MW 13.29 MW
293519 PILOT HIL;1E Adder 15.63 MW 13.29 MW
290108 LEEDK;1U E Adder 20.36 MW 17.31 MW
916221 Z1-073 E Adder 6.25 MW 5.31 MW
274805 UNIV PK N;1U 50/50 1.91 MW 1.91 MW
274807 UNIV PK N;3U 50/50 1.93 MW 1.93 MW
274808 UNIV PK N;4U 50/50 1.92 MW 1.92 MW
274810 UNIV PK N;6U 50/50 1.92 MW 1.92 MW
274811 UNIV PK N;7U 50/50 1.93 MW 1.93 MW
274812 UNIV PK N;8U 50/50 1.91 MW 1.91 MW
274813 UNIV PK N;9U 50/50 1.91 MW 1.91 MW
274814 UNIV PK N;0U 50/50 1.9 MW 1.9 MW
274815 UNIV PK N;XU 50/50 1.91 MW 1.91 MW
274816 UNIV PK N;YU 50/50 1.93 MW 1.93 MW
936292 AD2-038 E Adder 13.47 MW 11.45 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936372 AD2-047 E Adder 18.53 MW 15.75 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
936512 AD2-066 E Adder 4.79 MW 4.07 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942422 AE2-255 E Adder 7.67 MW 6.52 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
942652 AE2-281 E Adder 4.68 MW 3.98 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943122 AE2-341 E Adder 5.33 MW 4.53 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
943592 AF1-030 E Adder 3.57 MW 3.04 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959092 AF2-200 E Adder 8.04 MW 6.83 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960592 AF2-350 E Adder 4.47 MW 3.8 MW
961012 AF2-392 E Adder 13.93 MW 11.84 MW
930481 AB1-089 C Adder 55.52 MW 47.19 MW
930482 AB1-089 E Adder 2.52 MW 2.15 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
938862 AE1-114 E Adder 11.32 MW 9.62 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939322 AE1-163 E Adder 32.8 MW 27.88 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939352 AE1-166 E Adder 7.9 MW 6.71 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
939402 AE1-172 E Adder 20.97 MW 17.82 MW
946152 AF1-280 E Adder 19.2 MW 16.32 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962692 AG1-118 E Adder 12.54 MW 10.66 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
941552 AE2-152 E Adder 6.58 MW 5.59 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
958012 AF2-095 E Adder 6.43 MW 5.47 MW
276675 AE2-062 E Adder 0.14 MW 0.12 MW
276170 Z1-108 E Adder 2.49 MW 2.11 MW
920272 AA2-123 E Adder 2.44 MW 2.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.53 MW 69.53 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.79 MW 11.79 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.74 MW 1.74 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.85 MW 2.85 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 11.14 MW 11.14 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT3-4___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
Contingency Name:
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 127.75 %
Rating: 970.0 MVA
Rating Type: STE
MVA to Mitigate: 1239.13 MVA
MW Contribution: 31.36 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.23 MW 1.9 MW
962781 AG1-127 C Adder 5.94 MW 5.05 MW
962782 AG1-127 E Adder 3.95 MW 3.36 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966092 AG1-478 E Adder 0.44 MW 0.38 MW
966431 AG1-512 C Adder 3.81 MW 3.24 MW
966432 AG1-512 E Adder 5.72 MW 4.86 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
966442 AG1-513 E Adder 0.65 MW 0.55 MW
290021 O50 E Adder 16.36 MW 13.9 MW
290051 GSG-6; E Adder 8.87 MW 7.54 MW
295109 WESTBROOK E Adder 4.75 MW 4.04 MW
295111 SUBLETTE E Adder 2.31 MW 1.96 MW
910542 X3-005 E Adder 0.54 MW 0.46 MW
918052 AA1-018 E OP Adder 14.9 MW 12.67 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
933912 AD1-013 E Adder 2.49 MW 2.12 MW
934722 AD1-100 E Adder 76.78 MW 65.27 MW
937002 AD2-134 E Adder 8.58 MW 7.29 MW
937312 AD2-172 E Adder 2.86 MW 2.44 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
942992 AE2-321 E Adder 3.41 MW 2.9 MW
958481 AF2-142 C Adder 10.28 MW 8.74 MW
958482 AF2-142 E Adder 6.85 MW 5.82 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
958492 AF2-143 E Adder 6.54 MW 5.56 MW
958912 AF2-182 E Adder 28.8 MW 24.48 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959082 AF2-199 E Adder 3.01 MW 2.56 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
959352 AF2-226 E Adder 3.04 MW 2.58 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960282 AF2-319 E Adder 3.04 MW 2.58 MW
960582 AF2-349 E Adder 30.7 MW 26.09 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
960752 AF2-366 E Adder 3.95 MW 3.36 MW
274675 JOLIET 29;7U Adder 62.32 MW 52.97 MW
274676 JOLIET 29;8U Adder 62.3 MW 52.95 MW
274682 WAUKEGAN ;7U Adder 35.1 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.84 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274859 EASYR;U1 E Adder 10.13 MW 8.61 MW
274860 EASYR;U2 E Adder 10.13 MW 8.61 MW
276591 L-013 2 Adder 3.12 MW 2.65 MW
293061 N-015 E Adder 13.2 MW 11.22 MW
293644 O22 E1 Adder 11.65 MW 9.9 MW
293645 O22 E2 Adder 13.34 MW 11.34 MW
294392 P-010 E Adder 16.77 MW 14.25 MW
294763 P-046 E Adder 7.96 MW 6.77 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
933412 AC2-154 E Adder 3.46 MW 2.94 MW
940502 AE2-035 E Adder 2.86 MW 2.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957332 AF2-027 E Adder 3.18 MW 2.71 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
957472 AF2-041 E Adder 9.04 MW 7.68 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
274890 CAYUG;1U E Adder 11.46 MW 9.74 MW
274891 CAYUG;2U E Adder 11.46 MW 9.74 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
938852 AE1-113 E Adder 23.92 MW 20.33 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.33 MW
275149 KELLYCK ;1E Adder 15.63 MW 13.29 MW
293519 PILOT HIL;1E Adder 15.63 MW 13.29 MW
290108 LEEDK;1U E Adder 20.36 MW 17.31 MW
916221 Z1-073 E Adder 6.25 MW 5.31 MW
274805 UNIV PK N;1U 50/50 1.91 MW 1.91 MW
274807 UNIV PK N;3U 50/50 1.93 MW 1.93 MW
274808 UNIV PK N;4U 50/50 1.92 MW 1.92 MW
274810 UNIV PK N;6U 50/50 1.92 MW 1.92 MW
274811 UNIV PK N;7U 50/50 1.93 MW 1.93 MW
274812 UNIV PK N;8U 50/50 1.91 MW 1.91 MW
274813 UNIV PK N;9U 50/50 1.91 MW 1.91 MW
274814 UNIV PK N;0U 50/50 1.9 MW 1.9 MW
274815 UNIV PK N;XU 50/50 1.91 MW 1.91 MW
274816 UNIV PK N;YU 50/50 1.93 MW 1.93 MW
936292 AD2-038 E Adder 13.47 MW 11.45 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936372 AD2-047 E Adder 18.53 MW 15.75 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
936512 AD2-066 E Adder 4.79 MW 4.07 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942422 AE2-255 E Adder 7.67 MW 6.52 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
942652 AE2-281 E Adder 4.68 MW 3.98 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943122 AE2-341 E Adder 5.33 MW 4.53 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
943592 AF1-030 E Adder 3.57 MW 3.04 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959092 AF2-200 E Adder 8.04 MW 6.83 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960592 AF2-350 E Adder 4.47 MW 3.8 MW
961012 AF2-392 E Adder 13.93 MW 11.84 MW
930481 AB1-089 C Adder 55.52 MW 47.19 MW
930482 AB1-089 E Adder 2.52 MW 2.15 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
938862 AE1-114 E Adder 11.32 MW 9.62 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939322 AE1-163 E Adder 32.8 MW 27.88 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939352 AE1-166 E Adder 7.9 MW 6.71 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
939402 AE1-172 E Adder 20.96 MW 17.82 MW
946152 AF1-280 E Adder 19.2 MW 16.32 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962692 AG1-118 E Adder 12.54 MW 10.66 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
941552 AE2-152 E Adder 6.58 MW 5.59 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
958012 AF2-095 E Adder 6.43 MW 5.47 MW
276675 AE2-062 E Adder 0.14 MW 0.12 MW
276170 Z1-108 E Adder 2.49 MW 2.11 MW
920272 AA2-123 E Adder 2.44 MW 2.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.53 MW 69.53 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.79 MW 11.79 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.74 MW 1.74 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.85 MW 2.85 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 11.14 MW 11.14 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o AEP_P4_#2978_05DUMONT 765_B_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
Contingency Name:
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 127.71 %
Rating: 970.0 MVA
Rating Type: STE
MVA to Mitigate: 1238.79 MVA
MW Contribution: 31.12 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.21 MW 1.88 MW
962781 AG1-127 C Adder 5.9 MW 5.01 MW
962782 AG1-127 E Adder 3.92 MW 3.34 MW
966091 AG1-478 C Adder 1.76 MW 1.49 MW
966092 AG1-478 E Adder 0.44 MW 0.38 MW
966431 AG1-512 C Adder 3.79 MW 3.22 MW
966432 AG1-512 E Adder 5.69 MW 4.83 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
966442 AG1-513 E Adder 0.64 MW 0.55 MW
290021 O50 E Adder 16.24 MW 13.81 MW
290051 GSG-6; E Adder 8.81 MW 7.49 MW
295109 WESTBROOK E Adder 4.72 MW 4.01 MW
295111 SUBLETTE E Adder 2.29 MW 1.95 MW
910542 X3-005 E Adder 0.53 MW 0.45 MW
918052 AA1-018 E OP Adder 14.8 MW 12.58 MW
933911 AD1-013 C Adder 1.55 MW 1.32 MW
933912 AD1-013 E Adder 2.48 MW 2.11 MW
934722 AD1-100 E Adder 76.16 MW 64.74 MW
937002 AD2-134 E Adder 8.52 MW 7.24 MW
937312 AD2-172 E Adder 2.85 MW 2.42 MW
942991 AE2-321 C Adder 6.87 MW 5.84 MW
942992 AE2-321 E Adder 3.38 MW 2.88 MW
958481 AF2-142 C Adder 10.2 MW 8.67 MW
958482 AF2-142 E Adder 6.8 MW 5.78 MW
958491 AF2-143 C Adder 9.74 MW 8.28 MW
958492 AF2-143 E Adder 6.49 MW 5.52 MW
958912 AF2-182 E Adder 28.63 MW 24.33 MW
959081 AF2-199 C Adder 5.99 MW 5.09 MW
959082 AF2-199 E Adder 2.99 MW 2.54 MW
959351 AF2-226 C Adder 2.01 MW 1.71 MW
959352 AF2-226 E Adder 3.02 MW 2.56 MW
960281 AF2-319 C Adder 2.01 MW 1.71 MW
960282 AF2-319 E Adder 3.02 MW 2.56 MW
960582 AF2-349 E Adder 30.48 MW 25.91 MW
960751 AF2-366 C Adder 5.88 MW 5.0 MW
960752 AF2-366 E Adder 3.92 MW 3.33 MW
274675 JOLIET 29;7U Adder 61.79 MW 52.52 MW
274676 JOLIET 29;8U Adder 61.77 MW 52.5 MW
274682 WAUKEGAN ;7U Adder 34.82 MW 29.6 MW
274683 WAUKEGAN ;8U Adder 37.55 MW 31.91 MW
274687 WILL CNTY;4U Adder 55.58 MW 47.24 MW
274859 EASYR;U1 E Adder 10.07 MW 8.56 MW
274860 EASYR;U2 E Adder 10.07 MW 8.56 MW
276591 L-013 2 Adder 3.09 MW 2.63 MW
293061 N-015 E Adder 13.1 MW 11.14 MW
293644 O22 E1 Adder 11.55 MW 9.82 MW
293645 O22 E2 Adder 13.23 MW 11.25 MW
294392 P-010 E Adder 16.64 MW 14.14 MW
294763 P-046 E Adder 7.91 MW 6.72 MW
933411 AC2-154 C Adder 2.1 MW 1.79 MW
933412 AC2-154 E Adder 3.43 MW 2.92 MW
940502 AE2-035 E Adder 2.85 MW 2.42 MW
957331 AF2-027 C Adder 2.1 MW 1.79 MW
957332 AF2-027 E Adder 3.16 MW 2.68 MW
957471 AF2-041 C Adder 17.96 MW 15.26 MW
957472 AF2-041 E Adder 8.98 MW 7.63 MW
274674 JOLIET 9 ;6U Adder 31.03 MW 26.38 MW
274890 CAYUG;1U E Adder 11.4 MW 9.69 MW
274891 CAYUG;2U E Adder 11.4 MW 9.69 MW
938851 AE1-113 C Adder 6.7 MW 5.7 MW
938852 AE1-113 E Adder 23.76 MW 20.19 MW
934101 AD2-000 1 Adder 4.88 MW 4.15 MW
934111 AD2-000 2 Adder 5.05 MW 4.29 MW
275149 KELLYCK ;1E Adder 15.49 MW 13.16 MW
293519 PILOT HIL;1E Adder 15.49 MW 13.16 MW
290108 LEEDK;1U E Adder 20.22 MW 17.18 MW
916221 Z1-073 E Adder 6.21 MW 5.28 MW
274805 UNIV PK N;1U 50/50 1.9 MW 1.9 MW
274807 UNIV PK N;3U 50/50 1.92 MW 1.92 MW
274808 UNIV PK N;4U 50/50 1.91 MW 1.91 MW
274810 UNIV PK N;6U 50/50 1.91 MW 1.91 MW
274811 UNIV PK N;7U 50/50 1.92 MW 1.92 MW
274812 UNIV PK N;8U 50/50 1.9 MW 1.9 MW
274813 UNIV PK N;9U 50/50 1.9 MW 1.9 MW
274814 UNIV PK N;0U 50/50 1.89 MW 1.89 MW
274815 UNIV PK N;XU 50/50 1.9 MW 1.9 MW
274816 UNIV PK N;YU 50/50 1.92 MW 1.92 MW
936292 AD2-038 E Adder 13.38 MW 11.37 MW
936371 AD2-047 C Adder 3.76 MW 3.2 MW
936372 AD2-047 E Adder 18.37 MW 15.61 MW
936461 AD2-060 C Adder 2.21 MW 1.88 MW
936511 AD2-066 C Adder 7.13 MW 6.06 MW
936512 AD2-066 E Adder 4.75 MW 4.04 MW
942421 AE2-255 C Adder 2.54 MW 2.16 MW
942422 AE2-255 E Adder 7.61 MW 6.47 MW
942651 AE2-281 C Adder 0.76 MW 0.64 MW
942652 AE2-281 E Adder 4.65 MW 3.96 MW
943121 AE2-341 C Adder 10.77 MW 9.16 MW
943122 AE2-341 E Adder 5.29 MW 4.5 MW
943591 AF1-030 C Adder 7.16 MW 6.09 MW
943592 AF1-030 E Adder 3.54 MW 3.01 MW
959091 AF2-200 C Adder 11.97 MW 10.18 MW
959092 AF2-200 E Adder 7.98 MW 6.78 MW
960591 AF2-350 C Adder 6.64 MW 5.64 MW
960592 AF2-350 E Adder 4.42 MW 3.76 MW
961012 AF2-392 E Adder 13.85 MW 11.77 MW
930481 AB1-089 C Adder 55.14 MW 46.87 MW
930482 AB1-089 E Adder 2.51 MW 2.13 MW
938861 AE1-114 C Adder 3.3 MW 2.8 MW
938862 AE1-114 E Adder 11.24 MW 9.56 MW
939321 AE1-163 C Adder 5.3 MW 4.51 MW
939322 AE1-163 E Adder 32.57 MW 27.69 MW
939351 AE1-166 C Adder 8.49 MW 7.21 MW
939352 AE1-166 E Adder 7.83 MW 6.66 MW
939401 AE1-172 C Adder 4.45 MW 3.78 MW
939402 AE1-172 E Adder 20.84 MW 17.71 MW
946152 AF1-280 E Adder 19.08 MW 16.22 MW
946671 AF1-331 C Adder 2.01 MW 1.71 MW
962691 AG1-118 C Adder 18.68 MW 15.87 MW
962692 AG1-118 E Adder 12.45 MW 10.58 MW
941551 AE2-152 C Adder 9.79 MW 8.32 MW
941552 AE2-152 E Adder 6.53 MW 5.55 MW
958011 AF2-095 C Adder 9.56 MW 8.12 MW
958012 AF2-095 E Adder 6.37 MW 5.42 MW
276675 AE2-062 E Adder 0.13 MW 0.11 MW
276170 Z1-108 E Adder 2.47 MW 2.1 MW
920272 AA2-123 E Adder 2.42 MW 2.06 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 68.23 MW 68.23 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 12.47 MW 12.47 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.73 MW 1.73 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.29 MW 3.29 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.41 MW 0.41 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.21 MW 0.21 MW
TVA LTFEXP_TVA->PJM CLTF 1.17 MW 1.17 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.41 MW 0.41 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.17 MW 1.17 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.99 MW 2.99 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 11.09 MW 11.09 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.61 MW 0.61 MW

Details for WILTON ;4M-WILTON ; 345.0/765.0 kV Ckt 1 transformer l/o COMED_P4_112-65-BT2-3___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
WILTON ;4M-WILTON ; 345.0/765.0 kV Ckt 1 transformer
275233 to 270644 ckt 1
Contingency Name:
COMED_P4_112-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 119.54 %
Rating: 1469.0 MVA
Rating Type: STE
MVA to Mitigate: 1756.0 MVA
MW Contribution: 40.22 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.86 MW 2.44 MW
962781 AG1-127 C Adder 7.62 MW 6.48 MW
962782 AG1-127 E Adder 5.07 MW 4.31 MW
966091 AG1-478 C 50/50 2.3 MW 2.3 MW
966092 AG1-478 E 50/50 0.58 MW 0.58 MW
966441 AG1-513 C Adder 0.55 MW 0.47 MW
966442 AG1-513 E Adder 0.83 MW 0.71 MW
290021 O50 E Adder 20.94 MW 17.8 MW
290051 GSG-6; E Adder 11.4 MW 9.69 MW
295109 WESTBROOK E Adder 6.1 MW 5.19 MW
295111 SUBLETTE E Adder 2.97 MW 2.52 MW
910542 X3-005 E Adder 0.79 MW 0.67 MW
918052 AA1-018 E OP Adder 17.74 MW 15.08 MW
933911 AD1-013 C Adder 2.01 MW 1.71 MW
933912 AD1-013 E Adder 3.2 MW 2.72 MW
934721 AD1-100 C 50/50 3.98 MW 3.98 MW
934722 AD1-100 E 50/50 121.42 MW 121.42 MW
937002 AD2-134 E Adder 11.02 MW 9.37 MW
942991 AE2-321 C Adder 8.85 MW 7.52 MW
942992 AE2-321 E Adder 4.36 MW 3.71 MW
958481 AF2-142 C Adder 12.23 MW 10.4 MW
958482 AF2-142 E Adder 8.15 MW 6.93 MW
958491 AF2-143 C Adder 11.91 MW 10.13 MW
958492 AF2-143 E Adder 7.94 MW 6.75 MW
959351 AF2-226 C Adder 2.72 MW 2.31 MW
959352 AF2-226 E Adder 4.08 MW 3.47 MW
960281 AF2-319 C Adder 2.72 MW 2.31 MW
960282 AF2-319 E Adder 4.08 MW 3.47 MW
960582 AF2-349 E Adder 39.29 MW 33.4 MW
960751 AF2-366 C Adder 7.6 MW 6.46 MW
960752 AF2-366 E Adder 5.07 MW 4.31 MW
274654 BRAIDWOOD;1U 50/50 30.61 MW 30.61 MW
274655 BRAIDWOOD;2U 50/50 29.83 MW 29.83 MW
274660 LASCO STA;1U 50/50 27.98 MW 27.98 MW
274661 LASCO STA;2U 50/50 28.08 MW 28.08 MW
274675 JOLIET 29;7U Adder 78.12 MW 66.4 MW
274676 JOLIET 29;8U Adder 78.12 MW 66.4 MW
274682 WAUKEGAN ;7U Adder 44.63 MW 37.93 MW
274683 WAUKEGAN ;8U Adder 48.12 MW 40.9 MW
274687 WILL CNTY;4U Adder 72.66 MW 61.77 MW
274771 LINCOLN ;2U 50/50 3.16 MW 3.16 MW
274772 LINCOLN ;3U 50/50 3.16 MW 3.16 MW
274773 LINCOLN ;4U 50/50 3.16 MW 3.16 MW
274774 LINCOLN ;5U 50/50 3.16 MW 3.16 MW
274775 LINCOLN ;6U 50/50 3.16 MW 3.16 MW
274776 LINCOLN ;7U 50/50 3.16 MW 3.16 MW
274777 LINCOLN ;8U 50/50 3.16 MW 3.16 MW
274801 UNIV PARK;4U 50/50 1.24 MW 1.24 MW
274847 GR RIDGE ;BU 50/50 0.65 MW 0.65 MW
274863 CAYUGA RI;1U 50/50 0.53 MW 0.53 MW
274864 CAYUGA RI;2U 50/50 0.53 MW 0.53 MW
274871 GR RIDGE ;2U 50/50 0.24 MW 0.24 MW
274887 PILOT HIL;1U 50/50 0.87 MW 0.87 MW
274888 KELLY CRK;1U 50/50 0.87 MW 0.87 MW
276591 L-013 2 Adder 3.99 MW 3.39 MW
293061 N-015 E 50/50 17.58 MW 17.58 MW
293644 O22 E1 Adder 15.62 MW 13.28 MW
293645 O22 E2 Adder 17.89 MW 15.21 MW
294392 P-010 E 50/50 22.33 MW 22.33 MW
933411 AC2-154 C 50/50 2.91 MW 2.91 MW
933412 AC2-154 E 50/50 4.75 MW 4.75 MW
957331 AF2-027 C Adder 2.7 MW 2.29 MW
957332 AF2-027 E Adder 4.05 MW 3.44 MW
274674 JOLIET 9 ;6U Adder 39.73 MW 33.77 MW
274890 CAYUG;1U E 50/50 17.3 MW 17.3 MW
274891 CAYUG;2U E 50/50 17.3 MW 17.3 MW
938851 AE1-113 C Adder 8.64 MW 7.34 MW
938852 AE1-113 E Adder 30.62 MW 26.03 MW
934101 AD2-000 1 Adder 6.33 MW 5.38 MW
934111 AD2-000 2 Adder 6.48 MW 5.51 MW
275149 KELLYCK ;1E 50/50 21.43 MW 21.43 MW
293519 PILOT HIL;1E 50/50 21.43 MW 21.43 MW
290108 LEEDK;1U E Adder 26.14 MW 22.22 MW
916221 Z1-073 E Adder 8.03 MW 6.83 MW
936292 AD2-038 E Adder 16.36 MW 13.91 MW
936371 AD2-047 C 50/50 5.2 MW 5.2 MW
936372 AD2-047 E 50/50 25.41 MW 25.41 MW
936461 AD2-060 C 50/50 3.06 MW 3.06 MW
936511 AD2-066 C Adder 9.21 MW 7.83 MW
936512 AD2-066 E Adder 6.14 MW 5.22 MW
942421 AE2-255 C Adder 3.27 MW 2.78 MW
942422 AE2-255 E Adder 9.81 MW 8.34 MW
942651 AE2-281 C Adder 0.93 MW 0.79 MW
942652 AE2-281 E Adder 5.69 MW 4.84 MW
943121 AE2-341 C Adder 13.95 MW 11.86 MW
943122 AE2-341 E Adder 6.85 MW 5.82 MW
943591 AF1-030 C Adder 9.28 MW 7.88 MW
943592 AF1-030 E Adder 4.59 MW 3.9 MW
960591 AF2-350 C 50/50 9.18 MW 9.18 MW
960592 AF2-350 E 50/50 6.12 MW 6.12 MW
961501 AF2-441 C Adder 10.83 MW 9.2 MW
961502 AF2-441 E Adder 16.24 MW 13.81 MW
930481 AB1-089 C Adder 45.74 MW 38.88 MW
930482 AB1-089 E Adder 2.08 MW 1.77 MW
939321 AE1-163 C Adder 6.49 MW 5.51 MW
939322 AE1-163 E Adder 39.85 MW 33.87 MW
939351 AE1-166 C 50/50 13.53 MW 13.53 MW
939352 AE1-166 E 50/50 12.49 MW 12.49 MW
939401 AE1-172 C 50/50 6.88 MW 6.88 MW
939402 AE1-172 E 50/50 32.21 MW 32.21 MW
946671 AF1-331 C Adder 2.61 MW 2.21 MW
962691 AG1-118 C Adder 24.13 MW 20.51 MW
962692 AG1-118 E Adder 16.09 MW 13.68 MW
941551 AE2-152 C 50/50 15.61 MW 15.61 MW
941552 AE2-152 E 50/50 10.41 MW 10.41 MW
958011 AF2-095 C 50/50 13.22 MW 13.22 MW
958012 AF2-095 E 50/50 8.82 MW 8.82 MW
274798 UNIV PARK;1U 50/50 1.24 MW 1.24 MW
274770 LINCOLN ;1U 50/50 3.16 MW 3.16 MW
276675 AE2-062 E Adder 0.17 MW 0.14 MW
276170 Z1-108 E Adder 3.17 MW 2.7 MW
920272 AA2-123 E Adder 3.12 MW 2.65 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 97.73 MW 97.73 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.8 MW 16.8 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.35 MW 2.35 MW
NY PJM->LTFIMP_NY CLTF 1.26 MW 1.26 MW
WEC LTFEXP_WEC->PJM CLTF 4.23 MW 4.23 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.61 MW 0.61 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.32 MW 0.32 MW
TVA LTFEXP_TVA->PJM CLTF 1.46 MW 1.46 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.66 MW 0.66 MW
MEC LTFEXP_MEC->PJM CLTF 14.26 MW 14.26 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.9 MW 1.9 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.87 MW 3.87 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.02 MW 0.02 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 15.1 MW 15.1 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.9 MW 0.9 MW

Details for WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT2-3___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
WILTON ; R-WILTON ;4M 345.0 kV Ckt 1 line
270927 to 275233 ckt 1
Contingency Name:
COMED_P4_112-65-BT2-3___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT2-3___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 119.37 %
Rating: 1469.0 MVA
Rating Type: STE
MVA to Mitigate: 1753.58 MVA
MW Contribution: 40.22 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.86 MW 2.44 MW
962781 AG1-127 C Adder 7.62 MW 6.48 MW
962782 AG1-127 E Adder 5.07 MW 4.31 MW
966091 AG1-478 C 50/50 2.3 MW 2.3 MW
966092 AG1-478 E 50/50 0.58 MW 0.58 MW
966441 AG1-513 C Adder 0.55 MW 0.47 MW
966442 AG1-513 E Adder 0.83 MW 0.71 MW
290021 O50 E Adder 20.94 MW 17.8 MW
290051 GSG-6; E Adder 11.4 MW 9.69 MW
295109 WESTBROOK E Adder 6.1 MW 5.19 MW
295111 SUBLETTE E Adder 2.97 MW 2.52 MW
910542 X3-005 E Adder 0.79 MW 0.67 MW
918052 AA1-018 E OP Adder 17.74 MW 15.08 MW
933911 AD1-013 C Adder 2.01 MW 1.71 MW
933912 AD1-013 E Adder 3.2 MW 2.72 MW
934721 AD1-100 C 50/50 3.98 MW 3.98 MW
934722 AD1-100 E 50/50 121.42 MW 121.42 MW
937002 AD2-134 E Adder 11.02 MW 9.37 MW
942991 AE2-321 C Adder 8.85 MW 7.52 MW
942992 AE2-321 E Adder 4.36 MW 3.71 MW
958481 AF2-142 C Adder 12.23 MW 10.4 MW
958482 AF2-142 E Adder 8.15 MW 6.93 MW
958491 AF2-143 C Adder 11.91 MW 10.13 MW
958492 AF2-143 E Adder 7.94 MW 6.75 MW
959351 AF2-226 C Adder 2.72 MW 2.31 MW
959352 AF2-226 E Adder 4.08 MW 3.47 MW
960281 AF2-319 C Adder 2.72 MW 2.31 MW
960282 AF2-319 E Adder 4.08 MW 3.47 MW
960582 AF2-349 E Adder 39.29 MW 33.4 MW
960751 AF2-366 C Adder 7.6 MW 6.46 MW
960752 AF2-366 E Adder 5.07 MW 4.31 MW
274654 BRAIDWOOD;1U 50/50 30.61 MW 30.61 MW
274655 BRAIDWOOD;2U 50/50 29.83 MW 29.83 MW
274660 LASCO STA;1U 50/50 27.98 MW 27.98 MW
274661 LASCO STA;2U 50/50 28.08 MW 28.08 MW
274675 JOLIET 29;7U Adder 78.12 MW 66.4 MW
274676 JOLIET 29;8U Adder 78.12 MW 66.4 MW
274682 WAUKEGAN ;7U Adder 44.63 MW 37.93 MW
274683 WAUKEGAN ;8U Adder 48.12 MW 40.9 MW
274687 WILL CNTY;4U Adder 72.66 MW 61.77 MW
274771 LINCOLN ;2U 50/50 3.16 MW 3.16 MW
274772 LINCOLN ;3U 50/50 3.16 MW 3.16 MW
274773 LINCOLN ;4U 50/50 3.16 MW 3.16 MW
274774 LINCOLN ;5U 50/50 3.16 MW 3.16 MW
274775 LINCOLN ;6U 50/50 3.16 MW 3.16 MW
274776 LINCOLN ;7U 50/50 3.16 MW 3.16 MW
274777 LINCOLN ;8U 50/50 3.16 MW 3.16 MW
274801 UNIV PARK;4U 50/50 1.24 MW 1.24 MW
274847 GR RIDGE ;BU 50/50 0.65 MW 0.65 MW
274863 CAYUGA RI;1U 50/50 0.53 MW 0.53 MW
274864 CAYUGA RI;2U 50/50 0.53 MW 0.53 MW
274871 GR RIDGE ;2U 50/50 0.24 MW 0.24 MW
274887 PILOT HIL;1U 50/50 0.87 MW 0.87 MW
274888 KELLY CRK;1U 50/50 0.87 MW 0.87 MW
276591 L-013 2 Adder 3.99 MW 3.39 MW
293061 N-015 E 50/50 17.58 MW 17.58 MW
293644 O22 E1 Adder 15.62 MW 13.28 MW
293645 O22 E2 Adder 17.89 MW 15.21 MW
294392 P-010 E 50/50 22.33 MW 22.33 MW
933411 AC2-154 C 50/50 2.91 MW 2.91 MW
933412 AC2-154 E 50/50 4.75 MW 4.75 MW
957331 AF2-027 C Adder 2.7 MW 2.29 MW
957332 AF2-027 E Adder 4.05 MW 3.44 MW
274674 JOLIET 9 ;6U Adder 39.73 MW 33.77 MW
274890 CAYUG;1U E 50/50 17.3 MW 17.3 MW
274891 CAYUG;2U E 50/50 17.3 MW 17.3 MW
938851 AE1-113 C Adder 8.64 MW 7.34 MW
938852 AE1-113 E Adder 30.62 MW 26.03 MW
934101 AD2-000 1 Adder 6.33 MW 5.38 MW
934111 AD2-000 2 Adder 6.48 MW 5.51 MW
275149 KELLYCK ;1E 50/50 21.43 MW 21.43 MW
293519 PILOT HIL;1E 50/50 21.43 MW 21.43 MW
290108 LEEDK;1U E Adder 26.14 MW 22.22 MW
916221 Z1-073 E Adder 8.03 MW 6.83 MW
936292 AD2-038 E Adder 16.36 MW 13.91 MW
936371 AD2-047 C 50/50 5.2 MW 5.2 MW
936372 AD2-047 E 50/50 25.41 MW 25.41 MW
936461 AD2-060 C 50/50 3.06 MW 3.06 MW
936511 AD2-066 C Adder 9.21 MW 7.83 MW
936512 AD2-066 E Adder 6.14 MW 5.22 MW
942421 AE2-255 C Adder 3.27 MW 2.78 MW
942422 AE2-255 E Adder 9.81 MW 8.34 MW
942651 AE2-281 C Adder 0.93 MW 0.79 MW
942652 AE2-281 E Adder 5.69 MW 4.84 MW
943121 AE2-341 C Adder 13.95 MW 11.86 MW
943122 AE2-341 E Adder 6.85 MW 5.82 MW
943591 AF1-030 C Adder 9.28 MW 7.88 MW
943592 AF1-030 E Adder 4.59 MW 3.9 MW
960591 AF2-350 C 50/50 9.18 MW 9.18 MW
960592 AF2-350 E 50/50 6.12 MW 6.12 MW
961501 AF2-441 C Adder 10.83 MW 9.2 MW
961502 AF2-441 E Adder 16.24 MW 13.81 MW
930481 AB1-089 C Adder 45.74 MW 38.88 MW
930482 AB1-089 E Adder 2.08 MW 1.77 MW
939321 AE1-163 C Adder 6.49 MW 5.51 MW
939322 AE1-163 E Adder 39.85 MW 33.87 MW
939351 AE1-166 C 50/50 13.53 MW 13.53 MW
939352 AE1-166 E 50/50 12.49 MW 12.49 MW
939401 AE1-172 C 50/50 6.88 MW 6.88 MW
939402 AE1-172 E 50/50 32.21 MW 32.21 MW
946671 AF1-331 C Adder 2.61 MW 2.21 MW
962691 AG1-118 C Adder 24.13 MW 20.51 MW
962692 AG1-118 E Adder 16.09 MW 13.68 MW
941551 AE2-152 C 50/50 15.61 MW 15.61 MW
941552 AE2-152 E 50/50 10.41 MW 10.41 MW
958011 AF2-095 C 50/50 13.22 MW 13.22 MW
958012 AF2-095 E 50/50 8.82 MW 8.82 MW
274798 UNIV PARK;1U 50/50 1.24 MW 1.24 MW
274770 LINCOLN ;1U 50/50 3.16 MW 3.16 MW
276675 AE2-062 E Adder 0.17 MW 0.14 MW
276170 Z1-108 E Adder 3.17 MW 2.7 MW
920272 AA2-123 E Adder 3.12 MW 2.65 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 97.73 MW 97.73 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.8 MW 16.8 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.35 MW 2.35 MW
NY PJM->LTFIMP_NY CLTF 1.26 MW 1.26 MW
WEC LTFEXP_WEC->PJM CLTF 4.23 MW 4.23 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.61 MW 0.61 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.32 MW 0.32 MW
TVA LTFEXP_TVA->PJM CLTF 1.46 MW 1.46 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.66 MW 0.66 MW
MEC LTFEXP_MEC->PJM CLTF 14.26 MW 14.26 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.9 MW 1.9 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.87 MW 3.87 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.02 MW 0.02 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 15.1 MW 15.1 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.9 MW 0.9 MW

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT4-5___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE/NIPS
Facility Description:
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
Contingency Name:
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 126.8 %
Rating: 1399.0 MVA
Rating Type: B
MVA to Mitigate: 1773.9 MVA
MW Contribution: 37.85 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.69 MW 2.29 MW
962781 AG1-127 C Adder 7.17 MW 6.1 MW
962782 AG1-127 E Adder 4.77 MW 4.06 MW
966091 AG1-478 C Adder 2.01 MW 1.71 MW
966092 AG1-478 E Adder 0.51 MW 0.43 MW
966441 AG1-513 C Adder 0.52 MW 0.44 MW
966442 AG1-513 E Adder 0.78 MW 0.67 MW
290021 O50 E Adder 20.16 MW 17.14 MW
290051 GSG-6; E Adder 10.72 MW 9.11 MW
295109 WESTBROOK E Adder 5.74 MW 4.88 MW
295111 SUBLETTE E Adder 2.79 MW 2.37 MW
918052 AA1-018 E OP Adder 15.76 MW 13.4 MW
933911 AD1-013 C Adder 1.89 MW 1.6 MW
933912 AD1-013 E Adder 3.01 MW 2.56 MW
934722 AD1-100 E Adder 91.69 MW 77.94 MW
937002 AD2-134 E Adder 10.36 MW 8.81 MW
937312 AD2-172 E Adder 3.47 MW 2.95 MW
942991 AE2-321 C Adder 8.38 MW 7.12 MW
942992 AE2-321 E Adder 4.13 MW 3.51 MW
958481 AF2-142 C Adder 10.87 MW 9.24 MW
958482 AF2-142 E Adder 7.25 MW 6.16 MW
958491 AF2-143 C Adder 10.8 MW 9.18 MW
958492 AF2-143 E Adder 7.2 MW 6.12 MW
959081 AF2-199 C Adder 7.31 MW 6.22 MW
959082 AF2-199 E Adder 3.66 MW 3.11 MW
959351 AF2-226 C 50/50 2.95 MW 2.95 MW
959352 AF2-226 E 50/50 4.42 MW 4.42 MW
960281 AF2-319 C 50/50 2.95 MW 2.95 MW
960282 AF2-319 E 50/50 4.42 MW 4.42 MW
960582 AF2-349 E Adder 37.19 MW 31.61 MW
960751 AF2-366 C Adder 7.15 MW 6.08 MW
960752 AF2-366 E Adder 4.77 MW 4.05 MW
274654 BRAIDWOOD;1U 50/50 27.62 MW 27.62 MW
274655 BRAIDWOOD;2U 50/50 26.88 MW 26.88 MW
274675 JOLIET 29;7U Adder 76.21 MW 64.78 MW
274676 JOLIET 29;8U 50/50 76.25 MW 76.25 MW
274682 WAUKEGAN ;7U Adder 42.62 MW 36.23 MW
274683 WAUKEGAN ;8U Adder 45.94 MW 39.05 MW
274687 WILL CNTY;4U 50/50 71.94 MW 71.94 MW
274752 CRETE EC ;2U 50/50 6.11 MW 6.11 MW
274753 CRETE EC ;3U 50/50 6.11 MW 6.11 MW
274754 CRETE EC ;4U 50/50 6.11 MW 6.11 MW
274859 EASYR;U1 E Adder 9.39 MW 7.98 MW
274860 EASYR;U2 E Adder 12.27 MW 10.43 MW
274861 TOP CROP ;1U 50/50 0.44 MW 0.44 MW
274862 TOP CROP ;2U 50/50 0.84 MW 0.84 MW
276591 L-013 2 Adder 3.77 MW 3.2 MW
293061 N-015 E Adder 16.04 MW 13.64 MW
293644 O22 E1 50/50 16.93 MW 16.93 MW
293645 O22 E2 50/50 19.39 MW 19.39 MW
294392 P-010 E Adder 20.38 MW 17.32 MW
294763 P-046 E Adder 9.64 MW 8.2 MW
933411 AC2-154 C Adder 2.25 MW 1.91 MW
933412 AC2-154 E Adder 3.67 MW 3.12 MW
940502 AE2-035 E Adder 3.47 MW 2.95 MW
957331 AF2-027 C Adder 2.57 MW 2.19 MW
957332 AF2-027 E Adder 3.86 MW 3.28 MW
957471 AF2-041 C Adder 21.94 MW 18.65 MW
957472 AF2-041 E Adder 10.97 MW 9.32 MW
274674 JOLIET 9 ;6U Adder 35.32 MW 30.02 MW
938851 AE1-113 C Adder 8.32 MW 7.07 MW
938852 AE1-113 E Adder 29.48 MW 25.06 MW
934101 AD2-000 1 Adder 5.9 MW 5.01 MW
934111 AD2-000 2 Adder 6.31 MW 5.37 MW
274704 KENDALL ;1C 50/50 4.14 MW 4.14 MW
274705 KENDALL ;1S 50/50 2.77 MW 2.77 MW
274706 KENDALL ;2C 50/50 4.14 MW 4.14 MW
274707 KENDALL ;2S 50/50 2.77 MW 2.77 MW
275149 KELLYCK ;1E Adder 16.58 MW 14.09 MW
293519 PILOT HIL;1E Adder 16.58 MW 14.09 MW
290108 LEEDK;1U E Adder 24.58 MW 20.9 MW
916221 Z1-073 E Adder 7.55 MW 6.42 MW
936292 AD2-038 E Adder 14.84 MW 12.61 MW
936371 AD2-047 C Adder 4.03 MW 3.42 MW
936372 AD2-047 E Adder 19.66 MW 16.71 MW
936461 AD2-060 C Adder 2.37 MW 2.01 MW
936511 AD2-066 C Adder 8.52 MW 7.24 MW
936512 AD2-066 E Adder 5.68 MW 4.83 MW
942421 AE2-255 C Adder 3.15 MW 2.68 MW
942422 AE2-255 E Adder 9.45 MW 8.03 MW
942651 AE2-281 C Adder 0.84 MW 0.71 MW
942652 AE2-281 E Adder 5.16 MW 4.39 MW
943121 AE2-341 C Adder 13.05 MW 11.09 MW
943122 AE2-341 E Adder 6.41 MW 5.45 MW
943591 AF1-030 C Adder 8.68 MW 7.38 MW
943592 AF1-030 E Adder 4.29 MW 3.65 MW
959091 AF2-200 C Adder 14.62 MW 12.43 MW
959092 AF2-200 E Adder 9.75 MW 8.29 MW
960591 AF2-350 C Adder 7.11 MW 6.04 MW
960592 AF2-350 E Adder 4.74 MW 4.03 MW
930481 AB1-089 C Adder 67.25 MW 57.16 MW
930482 AB1-089 E Adder 3.06 MW 2.6 MW
938861 AE1-114 C Adder 4.02 MW 3.41 MW
938862 AE1-114 E Adder 13.7 MW 11.65 MW
939321 AE1-163 C Adder 5.88 MW 5.0 MW
939322 AE1-163 E Adder 36.13 MW 30.71 MW
939351 AE1-166 C Adder 10.22 MW 8.69 MW
939352 AE1-166 E Adder 9.43 MW 8.02 MW
939401 AE1-172 C Adder 5.34 MW 4.54 MW
939402 AE1-172 E Adder 25.01 MW 21.26 MW
946671 AF1-331 C Adder 2.45 MW 2.08 MW
962691 AG1-118 C Adder 22.71 MW 19.3 MW
962692 AG1-118 E Adder 15.14 MW 12.87 MW
941551 AE2-152 C Adder 11.79 MW 10.02 MW
941552 AE2-152 E Adder 7.86 MW 6.68 MW
958011 AF2-095 C Adder 10.23 MW 8.7 MW
958012 AF2-095 E Adder 6.82 MW 5.8 MW
274751 CRETE EC ;1U 50/50 6.11 MW 6.11 MW
276675 AE2-062 E Adder 0.15 MW 0.13 MW
276170 Z1-108 E Adder 3.01 MW 2.56 MW
920272 AA2-123 E Adder 2.95 MW 2.51 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 80.3 MW 80.3 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 13.41 MW 13.41 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.14 MW 2.14 MW
NY PJM->LTFIMP_NY CLTF 1.15 MW 1.15 MW
WEC LTFEXP_WEC->PJM CLTF 4.01 MW 4.01 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.58 MW 0.58 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.11 MW 1.11 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.71 MW 0.71 MW
MEC LTFEXP_MEC->PJM CLTF 13.16 MW 13.16 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.07 MW 2.07 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.28 MW 3.28 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 13.75 MW 13.75 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.83 MW 0.83 MW

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT3-4___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE/NIPS
Facility Description:
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
Contingency Name:
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 126.79 %
Rating: 1399.0 MVA
Rating Type: B
MVA to Mitigate: 1773.83 MVA
MW Contribution: 37.85 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.69 MW 2.29 MW
962781 AG1-127 C Adder 7.17 MW 6.1 MW
962782 AG1-127 E Adder 4.77 MW 4.06 MW
966091 AG1-478 C Adder 2.01 MW 1.71 MW
966092 AG1-478 E Adder 0.51 MW 0.43 MW
966441 AG1-513 C Adder 0.52 MW 0.44 MW
966442 AG1-513 E Adder 0.78 MW 0.67 MW
290021 O50 E Adder 20.16 MW 17.14 MW
290051 GSG-6; E Adder 10.71 MW 9.11 MW
295109 WESTBROOK E Adder 5.74 MW 4.88 MW
295111 SUBLETTE E Adder 2.79 MW 2.37 MW
918052 AA1-018 E OP Adder 15.76 MW 13.4 MW
933911 AD1-013 C Adder 1.89 MW 1.6 MW
933912 AD1-013 E Adder 3.01 MW 2.56 MW
934722 AD1-100 E Adder 91.7 MW 77.94 MW
937002 AD2-134 E Adder 10.36 MW 8.8 MW
937312 AD2-172 E Adder 3.47 MW 2.95 MW
942991 AE2-321 C Adder 8.38 MW 7.12 MW
942992 AE2-321 E Adder 4.13 MW 3.51 MW
958481 AF2-142 C Adder 10.87 MW 9.24 MW
958482 AF2-142 E Adder 7.25 MW 6.16 MW
958491 AF2-143 C Adder 10.8 MW 9.18 MW
958492 AF2-143 E Adder 7.2 MW 6.12 MW
959081 AF2-199 C Adder 7.31 MW 6.21 MW
959082 AF2-199 E Adder 3.66 MW 3.11 MW
959351 AF2-226 C 50/50 2.95 MW 2.95 MW
959352 AF2-226 E 50/50 4.42 MW 4.42 MW
960281 AF2-319 C 50/50 2.95 MW 2.95 MW
960282 AF2-319 E 50/50 4.42 MW 4.42 MW
960582 AF2-349 E Adder 37.19 MW 31.61 MW
960751 AF2-366 C Adder 7.15 MW 6.08 MW
960752 AF2-366 E Adder 4.77 MW 4.05 MW
274654 BRAIDWOOD;1U 50/50 27.62 MW 27.62 MW
274655 BRAIDWOOD;2U 50/50 26.88 MW 26.88 MW
274675 JOLIET 29;7U Adder 76.21 MW 64.78 MW
274676 JOLIET 29;8U 50/50 76.25 MW 76.25 MW
274682 WAUKEGAN ;7U Adder 42.62 MW 36.23 MW
274683 WAUKEGAN ;8U Adder 45.94 MW 39.05 MW
274687 WILL CNTY;4U 50/50 71.94 MW 71.94 MW
274752 CRETE EC ;2U 50/50 6.11 MW 6.11 MW
274753 CRETE EC ;3U 50/50 6.11 MW 6.11 MW
274754 CRETE EC ;4U 50/50 6.11 MW 6.11 MW
274859 EASYR;U1 E Adder 9.39 MW 7.98 MW
274860 EASYR;U2 E Adder 12.27 MW 10.43 MW
274861 TOP CROP ;1U 50/50 0.44 MW 0.44 MW
274862 TOP CROP ;2U 50/50 0.84 MW 0.84 MW
276591 L-013 2 Adder 3.77 MW 3.2 MW
293061 N-015 E Adder 16.04 MW 13.64 MW
293644 O22 E1 50/50 16.93 MW 16.93 MW
293645 O22 E2 50/50 19.39 MW 19.39 MW
294392 P-010 E Adder 20.38 MW 17.32 MW
294763 P-046 E Adder 9.64 MW 8.19 MW
933411 AC2-154 C Adder 2.25 MW 1.91 MW
933412 AC2-154 E Adder 3.67 MW 3.12 MW
940502 AE2-035 E Adder 3.47 MW 2.95 MW
957331 AF2-027 C Adder 2.57 MW 2.19 MW
957332 AF2-027 E Adder 3.86 MW 3.28 MW
957471 AF2-041 C Adder 21.94 MW 18.64 MW
957472 AF2-041 E Adder 10.97 MW 9.32 MW
274674 JOLIET 9 ;6U Adder 35.32 MW 30.02 MW
938851 AE1-113 C Adder 8.32 MW 7.07 MW
938852 AE1-113 E Adder 29.48 MW 25.06 MW
934101 AD2-000 1 Adder 5.9 MW 5.01 MW
934111 AD2-000 2 Adder 6.31 MW 5.37 MW
274704 KENDALL ;1C 50/50 4.14 MW 4.14 MW
274705 KENDALL ;1S 50/50 2.77 MW 2.77 MW
274706 KENDALL ;2C 50/50 4.14 MW 4.14 MW
274707 KENDALL ;2S 50/50 2.77 MW 2.77 MW
275149 KELLYCK ;1E Adder 16.58 MW 14.09 MW
293519 PILOT HIL;1E Adder 16.58 MW 14.09 MW
290108 LEEDK;1U E Adder 24.58 MW 20.89 MW
916221 Z1-073 E Adder 7.55 MW 6.42 MW
936292 AD2-038 E Adder 14.83 MW 12.61 MW
936371 AD2-047 C Adder 4.03 MW 3.42 MW
936372 AD2-047 E Adder 19.66 MW 16.71 MW
936461 AD2-060 C Adder 2.37 MW 2.01 MW
936511 AD2-066 C Adder 8.52 MW 7.24 MW
936512 AD2-066 E Adder 5.68 MW 4.83 MW
942421 AE2-255 C Adder 3.15 MW 2.68 MW
942422 AE2-255 E Adder 9.45 MW 8.03 MW
942651 AE2-281 C Adder 0.84 MW 0.71 MW
942652 AE2-281 E Adder 5.16 MW 4.39 MW
943121 AE2-341 C Adder 13.05 MW 11.09 MW
943122 AE2-341 E Adder 6.41 MW 5.45 MW
943591 AF1-030 C Adder 8.68 MW 7.38 MW
943592 AF1-030 E Adder 4.29 MW 3.65 MW
959091 AF2-200 C Adder 14.62 MW 12.43 MW
959092 AF2-200 E Adder 9.75 MW 8.29 MW
960591 AF2-350 C Adder 7.11 MW 6.04 MW
960592 AF2-350 E Adder 4.74 MW 4.03 MW
930481 AB1-089 C Adder 67.24 MW 57.16 MW
930482 AB1-089 E Adder 3.06 MW 2.6 MW
938861 AE1-114 C Adder 4.02 MW 3.41 MW
938862 AE1-114 E Adder 13.7 MW 11.64 MW
939321 AE1-163 C Adder 5.88 MW 5.0 MW
939322 AE1-163 E Adder 36.13 MW 30.71 MW
939351 AE1-166 C Adder 10.22 MW 8.69 MW
939352 AE1-166 E Adder 9.43 MW 8.02 MW
939401 AE1-172 C Adder 5.34 MW 4.54 MW
939402 AE1-172 E Adder 25.01 MW 21.26 MW
946671 AF1-331 C Adder 2.45 MW 2.08 MW
962691 AG1-118 C Adder 22.71 MW 19.3 MW
962692 AG1-118 E Adder 15.14 MW 12.87 MW
941551 AE2-152 C Adder 11.79 MW 10.02 MW
941552 AE2-152 E Adder 7.86 MW 6.68 MW
958011 AF2-095 C Adder 10.23 MW 8.7 MW
958012 AF2-095 E Adder 6.82 MW 5.8 MW
274751 CRETE EC ;1U 50/50 6.11 MW 6.11 MW
276675 AE2-062 E Adder 0.15 MW 0.13 MW
276170 Z1-108 E Adder 3.01 MW 2.56 MW
920272 AA2-123 E Adder 2.95 MW 2.51 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 80.3 MW 80.3 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 13.41 MW 13.41 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.14 MW 2.14 MW
NY PJM->LTFIMP_NY CLTF 1.15 MW 1.15 MW
WEC LTFEXP_WEC->PJM CLTF 4.01 MW 4.01 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.58 MW 0.58 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.11 MW 1.11 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.71 MW 0.71 MW
MEC LTFEXP_MEC->PJM CLTF 13.16 MW 13.16 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.07 MW 2.07 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.28 MW 3.28 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 13.75 MW 13.75 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.83 MW 0.83 MW

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o AEP_P4_#2978_05DUMONT 765_B_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE/NIPS
Facility Description:
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
Contingency Name:
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 126.77 %
Rating: 1399.0 MVA
Rating Type: B
MVA to Mitigate: 1773.54 MVA
MW Contribution: 37.68 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.68 MW 2.28 MW
962781 AG1-127 C Adder 7.14 MW 6.07 MW
962782 AG1-127 E Adder 4.75 MW 4.04 MW
966091 AG1-478 C Adder 2.0 MW 1.7 MW
966092 AG1-478 E Adder 0.5 MW 0.43 MW
966441 AG1-513 C Adder 0.52 MW 0.44 MW
966442 AG1-513 E Adder 0.78 MW 0.66 MW
290021 O50 E Adder 20.09 MW 17.07 MW
290051 GSG-6; E Adder 10.67 MW 9.07 MW
295109 WESTBROOK E Adder 5.71 MW 4.86 MW
295111 SUBLETTE E Adder 2.78 MW 2.36 MW
918052 AA1-018 E OP Adder 15.69 MW 13.34 MW
933911 AD1-013 C Adder 1.88 MW 1.6 MW
933912 AD1-013 E Adder 3.0 MW 2.55 MW
934722 AD1-100 E Adder 91.36 MW 77.66 MW
937002 AD2-134 E Adder 10.32 MW 8.77 MW
937312 AD2-172 E Adder 3.46 MW 2.94 MW
942991 AE2-321 C Adder 8.35 MW 7.09 MW
942992 AE2-321 E Adder 4.11 MW 3.5 MW
958481 AF2-142 C Adder 10.82 MW 9.2 MW
958482 AF2-142 E Adder 7.22 MW 6.13 MW
958491 AF2-143 C Adder 10.76 MW 9.15 MW
958492 AF2-143 E Adder 7.17 MW 6.1 MW
959081 AF2-199 C Adder 7.28 MW 6.19 MW
959082 AF2-199 E Adder 3.64 MW 3.1 MW
959351 AF2-226 C 50/50 2.94 MW 2.94 MW
959352 AF2-226 E 50/50 4.4 MW 4.4 MW
960281 AF2-319 C 50/50 2.94 MW 2.94 MW
960282 AF2-319 E 50/50 4.4 MW 4.4 MW
960582 AF2-349 E Adder 37.04 MW 31.48 MW
960751 AF2-366 C Adder 7.12 MW 6.05 MW
960752 AF2-366 E Adder 4.75 MW 4.04 MW
274654 BRAIDWOOD;1U 50/50 27.51 MW 27.51 MW
274655 BRAIDWOOD;2U 50/50 26.77 MW 26.77 MW
274675 JOLIET 29;7U Adder 75.87 MW 64.49 MW
274676 JOLIET 29;8U 50/50 75.91 MW 75.91 MW
274682 WAUKEGAN ;7U Adder 42.44 MW 36.07 MW
274683 WAUKEGAN ;8U Adder 45.74 MW 38.88 MW
274687 WILL CNTY;4U 50/50 71.62 MW 71.62 MW
274752 CRETE EC ;2U 50/50 6.1 MW 6.1 MW
274753 CRETE EC ;3U 50/50 6.1 MW 6.1 MW
274754 CRETE EC ;4U 50/50 6.1 MW 6.1 MW
274859 EASYR;U1 E Adder 9.36 MW 7.96 MW
274860 EASYR;U2 E Adder 12.22 MW 10.39 MW
274861 TOP CROP ;1U 50/50 0.44 MW 0.44 MW
274862 TOP CROP ;2U 50/50 0.84 MW 0.84 MW
276591 L-013 2 Adder 3.75 MW 3.19 MW
293061 N-015 E Adder 15.98 MW 13.58 MW
293644 O22 E1 50/50 16.87 MW 16.87 MW
293645 O22 E2 50/50 19.32 MW 19.32 MW
294392 P-010 E Adder 20.29 MW 17.25 MW
294763 P-046 E Adder 9.6 MW 8.16 MW
933411 AC2-154 C Adder 2.24 MW 1.9 MW
933412 AC2-154 E Adder 3.65 MW 3.1 MW
940502 AE2-035 E Adder 3.46 MW 2.94 MW
957331 AF2-027 C Adder 2.56 MW 2.18 MW
957332 AF2-027 E Adder 3.84 MW 3.27 MW
957471 AF2-041 C Adder 21.85 MW 18.57 MW
957472 AF2-041 E Adder 10.92 MW 9.29 MW
274674 JOLIET 9 ;6U Adder 35.15 MW 29.88 MW
938851 AE1-113 C Adder 8.29 MW 7.04 MW
938852 AE1-113 E Adder 29.38 MW 24.97 MW
934101 AD2-000 1 Adder 5.87 MW 4.99 MW
934111 AD2-000 2 Adder 6.29 MW 5.34 MW
274704 KENDALL ;1C 50/50 4.12 MW 4.12 MW
274705 KENDALL ;1S 50/50 2.76 MW 2.76 MW
274706 KENDALL ;2C 50/50 4.12 MW 4.12 MW
274707 KENDALL ;2S 50/50 2.76 MW 2.76 MW
275149 KELLYCK ;1E Adder 16.5 MW 14.02 MW
293519 PILOT HIL;1E Adder 16.5 MW 14.02 MW
290108 LEEDK;1U E Adder 24.48 MW 20.81 MW
916221 Z1-073 E Adder 7.52 MW 6.39 MW
936292 AD2-038 E Adder 14.78 MW 12.56 MW
936371 AD2-047 C Adder 4.01 MW 3.41 MW
936372 AD2-047 E Adder 19.56 MW 16.63 MW
936461 AD2-060 C Adder 2.36 MW 2.0 MW
936511 AD2-066 C Adder 8.48 MW 7.21 MW
936512 AD2-066 E Adder 5.66 MW 4.81 MW
942421 AE2-255 C Adder 3.14 MW 2.67 MW
942422 AE2-255 E Adder 9.42 MW 8.0 MW
942651 AE2-281 C Adder 0.84 MW 0.71 MW
942652 AE2-281 E Adder 5.14 MW 4.37 MW
943121 AE2-341 C Adder 12.99 MW 11.04 MW
943122 AE2-341 E Adder 6.38 MW 5.42 MW
943591 AF1-030 C Adder 8.64 MW 7.34 MW
943592 AF1-030 E Adder 4.27 MW 3.63 MW
959091 AF2-200 C Adder 14.57 MW 12.38 MW
959092 AF2-200 E Adder 9.71 MW 8.25 MW
960591 AF2-350 C Adder 7.07 MW 6.01 MW
960592 AF2-350 E Adder 4.71 MW 4.01 MW
930481 AB1-089 C Adder 66.98 MW 56.93 MW
930482 AB1-089 E Adder 3.04 MW 2.59 MW
938861 AE1-114 C Adder 4.0 MW 3.4 MW
938862 AE1-114 E Adder 13.65 MW 11.6 MW
939321 AE1-163 C Adder 5.86 MW 4.98 MW
939322 AE1-163 E Adder 35.99 MW 30.59 MW
939351 AE1-166 C Adder 10.18 MW 8.65 MW
939352 AE1-166 E Adder 9.4 MW 7.99 MW
939401 AE1-172 C Adder 5.33 MW 4.53 MW
939402 AE1-172 E Adder 24.94 MW 21.2 MW
946671 AF1-331 C Adder 2.44 MW 2.07 MW
962691 AG1-118 C Adder 22.61 MW 19.22 MW
962692 AG1-118 E Adder 15.07 MW 12.81 MW
941551 AE2-152 C Adder 11.75 MW 9.98 MW
941552 AE2-152 E Adder 7.83 MW 6.66 MW
958011 AF2-095 C Adder 10.18 MW 8.65 MW
958012 AF2-095 E Adder 6.79 MW 5.77 MW
274751 CRETE EC ;1U 50/50 6.1 MW 6.1 MW
276675 AE2-062 E Adder 0.15 MW 0.13 MW
276170 Z1-108 E Adder 3.0 MW 2.55 MW
920272 AA2-123 E Adder 2.94 MW 2.5 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 79.47 MW 79.47 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 13.83 MW 13.83 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.14 MW 2.14 MW
NY PJM->LTFIMP_NY CLTF 1.15 MW 1.15 MW
WEC LTFEXP_WEC->PJM CLTF 4.0 MW 4.0 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.55 MW 0.55 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.29 MW 0.29 MW
TVA LTFEXP_TVA->PJM CLTF 1.19 MW 1.19 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.63 MW 0.63 MW
MEC LTFEXP_MEC->PJM CLTF 13.16 MW 13.16 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.85 MW 1.85 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.37 MW 3.37 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 13.72 MW 13.72 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.81 MW 0.81 MW

Details for WILTON ;3M-WILTON ; 345.0/765.0 kV Ckt 1 transformer l/o COMED_P4_112-65-BT5-6___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
WILTON ;3M-WILTON ; 345.0/765.0 kV Ckt 1 transformer
275232 to 270644 ckt 1
Contingency Name:
COMED_P4_112-65-BT5-6___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT5-6___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 116.5 %
Rating: 1469.0 MVA
Rating Type: STE
MVA to Mitigate: 1711.46 MVA
MW Contribution: 39.18 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.79 MW 2.37 MW
962781 AG1-127 C Adder 7.43 MW 6.31 MW
962782 AG1-127 E Adder 4.94 MW 4.2 MW
966091 AG1-478 C 50/50 2.24 MW 2.24 MW
966092 AG1-478 E 50/50 0.56 MW 0.56 MW
966441 AG1-513 C Adder 0.54 MW 0.46 MW
966442 AG1-513 E Adder 0.81 MW 0.69 MW
290021 O50 E Adder 20.4 MW 17.34 MW
290051 GSG-6; E Adder 11.1 MW 9.44 MW
295109 WESTBROOK E Adder 5.94 MW 5.05 MW
295111 SUBLETTE E Adder 2.89 MW 2.46 MW
910542 X3-005 E Adder 0.77 MW 0.65 MW
918052 AA1-018 E OP Adder 17.27 MW 14.68 MW
933911 AD1-013 C Adder 1.95 MW 1.66 MW
933912 AD1-013 E Adder 3.12 MW 2.65 MW
934721 AD1-100 C 50/50 3.88 MW 3.88 MW
934722 AD1-100 E 50/50 118.44 MW 118.44 MW
937002 AD2-134 E Adder 10.73 MW 9.12 MW
942991 AE2-321 C Adder 8.62 MW 7.33 MW
942992 AE2-321 E Adder 4.25 MW 3.61 MW
958481 AF2-142 C Adder 11.91 MW 10.12 MW
958482 AF2-142 E Adder 7.94 MW 6.75 MW
958491 AF2-143 C Adder 11.6 MW 9.86 MW
958492 AF2-143 E Adder 7.74 MW 6.58 MW
959351 AF2-226 C Adder 2.65 MW 2.25 MW
959352 AF2-226 E Adder 3.97 MW 3.38 MW
960281 AF2-319 C Adder 2.65 MW 2.25 MW
960282 AF2-319 E Adder 3.97 MW 3.38 MW
960582 AF2-349 E Adder 38.28 MW 32.53 MW
960751 AF2-366 C Adder 7.4 MW 6.29 MW
960752 AF2-366 E Adder 4.94 MW 4.2 MW
274654 BRAIDWOOD;1U 50/50 29.85 MW 29.85 MW
274655 BRAIDWOOD;2U 50/50 29.09 MW 29.09 MW
274660 LASCO STA;1U 50/50 27.28 MW 27.28 MW
274661 LASCO STA;2U 50/50 27.37 MW 27.37 MW
274675 JOLIET 29;7U Adder 76.08 MW 64.67 MW
274676 JOLIET 29;8U Adder 76.08 MW 64.67 MW
274682 WAUKEGAN ;7U Adder 43.47 MW 36.95 MW
274683 WAUKEGAN ;8U Adder 46.87 MW 39.84 MW
274687 WILL CNTY;4U Adder 70.78 MW 60.17 MW
274771 LINCOLN ;2U 50/50 3.06 MW 3.06 MW
274772 LINCOLN ;3U 50/50 3.06 MW 3.06 MW
274773 LINCOLN ;4U 50/50 3.06 MW 3.06 MW
274774 LINCOLN ;5U 50/50 3.06 MW 3.06 MW
274775 LINCOLN ;6U 50/50 3.06 MW 3.06 MW
274776 LINCOLN ;7U 50/50 3.06 MW 3.06 MW
274777 LINCOLN ;8U 50/50 3.06 MW 3.06 MW
274799 UNIV PARK;2U 50/50 1.2 MW 1.2 MW
274847 GR RIDGE ;BU 50/50 0.64 MW 0.64 MW
274863 CAYUGA RI;1U 50/50 0.52 MW 0.52 MW
274864 CAYUGA RI;2U 50/50 0.52 MW 0.52 MW
274871 GR RIDGE ;2U 50/50 0.24 MW 0.24 MW
274887 PILOT HIL;1U 50/50 0.85 MW 0.85 MW
274888 KELLY CRK;1U 50/50 0.85 MW 0.85 MW
276591 L-013 2 Adder 3.88 MW 3.3 MW
293061 N-015 E 50/50 17.14 MW 17.14 MW
293644 O22 E1 Adder 15.22 MW 12.94 MW
293645 O22 E2 Adder 17.43 MW 14.82 MW
294392 P-010 E 50/50 21.76 MW 21.76 MW
933411 AC2-154 C 50/50 2.83 MW 2.83 MW
933412 AC2-154 E 50/50 4.62 MW 4.62 MW
957331 AF2-027 C Adder 2.63 MW 2.23 MW
957332 AF2-027 E Adder 3.94 MW 3.35 MW
274674 JOLIET 9 ;6U Adder 38.7 MW 32.9 MW
274890 CAYUG;1U E 50/50 16.87 MW 16.87 MW
274891 CAYUG;2U E 50/50 16.87 MW 16.87 MW
938851 AE1-113 C Adder 8.41 MW 7.15 MW
938852 AE1-113 E Adder 29.83 MW 25.36 MW
934101 AD2-000 1 Adder 6.17 MW 5.25 MW
934111 AD2-000 2 Adder 6.32 MW 5.37 MW
275149 KELLYCK ;1E 50/50 20.89 MW 20.89 MW
293519 PILOT HIL;1E 50/50 20.89 MW 20.89 MW
290108 LEEDK;1U E Adder 25.47 MW 21.65 MW
916221 Z1-073 E Adder 7.82 MW 6.65 MW
936292 AD2-038 E Adder 15.93 MW 13.54 MW
936371 AD2-047 C 50/50 5.07 MW 5.07 MW
936372 AD2-047 E 50/50 24.77 MW 24.77 MW
936461 AD2-060 C 50/50 2.98 MW 2.98 MW
936511 AD2-066 C Adder 8.98 MW 7.63 MW
936512 AD2-066 E Adder 5.98 MW 5.09 MW
942421 AE2-255 C Adder 3.19 MW 2.71 MW
942422 AE2-255 E Adder 9.56 MW 8.13 MW
942651 AE2-281 C Adder 0.9 MW 0.77 MW
942652 AE2-281 E Adder 5.54 MW 4.71 MW
943121 AE2-341 C Adder 13.59 MW 11.55 MW
943122 AE2-341 E Adder 6.67 MW 5.67 MW
943591 AF1-030 C Adder 9.04 MW 7.68 MW
943592 AF1-030 E Adder 4.47 MW 3.8 MW
960591 AF2-350 C 50/50 8.95 MW 8.95 MW
960592 AF2-350 E 50/50 5.97 MW 5.97 MW
961501 AF2-441 C Adder 10.55 MW 8.97 MW
961502 AF2-441 E Adder 15.83 MW 13.45 MW
930481 AB1-089 C Adder 44.56 MW 37.87 MW
930482 AB1-089 E Adder 2.03 MW 1.72 MW
939321 AE1-163 C Adder 6.32 MW 5.37 MW
939322 AE1-163 E Adder 38.8 MW 32.98 MW
939351 AE1-166 C 50/50 13.2 MW 13.2 MW
939352 AE1-166 E 50/50 12.18 MW 12.18 MW
939401 AE1-172 C 50/50 6.71 MW 6.71 MW
939402 AE1-172 E 50/50 31.41 MW 31.41 MW
946671 AF1-331 C Adder 2.54 MW 2.16 MW
962691 AG1-118 C Adder 23.51 MW 19.98 MW
962692 AG1-118 E Adder 15.67 MW 13.32 MW
941551 AE2-152 C 50/50 15.23 MW 15.23 MW
941552 AE2-152 E 50/50 10.15 MW 10.15 MW
958011 AF2-095 C 50/50 12.89 MW 12.89 MW
958012 AF2-095 E 50/50 8.59 MW 8.59 MW
274798 UNIV PARK;1U 50/50 1.21 MW 1.21 MW
274770 LINCOLN ;1U 50/50 3.06 MW 3.06 MW
276675 AE2-062 E Adder 0.16 MW 0.14 MW
276170 Z1-108 E Adder 3.09 MW 2.63 MW
920272 AA2-123 E Adder 3.04 MW 2.58 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 95.21 MW 95.21 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.37 MW 16.37 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.29 MW 2.29 MW
NY PJM->LTFIMP_NY CLTF 1.23 MW 1.23 MW
WEC LTFEXP_WEC->PJM CLTF 4.12 MW 4.12 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.6 MW 0.6 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.43 MW 1.43 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.65 MW 0.65 MW
MEC LTFEXP_MEC->PJM CLTF 13.9 MW 13.9 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.85 MW 1.85 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.77 MW 3.77 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.02 MW 0.02 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 14.71 MW 14.71 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.87 MW 0.87 MW

Details for WILTON ; B-WILTON ;3M 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT5-6___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
WILTON ; B-WILTON ;3M 345.0 kV Ckt 1 line
270926 to 275232 ckt 1
Contingency Name:
COMED_P4_112-65-BT5-6___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT5-6___SRT-A'
 TRIP BRANCH FROM BUS 270644 TO BUS 270607 CKT 1   /*WILTON   ;   765.0 - COLLINS  ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 116.34 %
Rating: 1469.0 MVA
Rating Type: STE
MVA to Mitigate: 1708.97 MVA
MW Contribution: 39.18 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.79 MW 2.37 MW
962781 AG1-127 C Adder 7.43 MW 6.31 MW
962782 AG1-127 E Adder 4.94 MW 4.2 MW
966091 AG1-478 C 50/50 2.24 MW 2.24 MW
966092 AG1-478 E 50/50 0.56 MW 0.56 MW
966441 AG1-513 C Adder 0.54 MW 0.46 MW
966442 AG1-513 E Adder 0.81 MW 0.69 MW
290021 O50 E Adder 20.4 MW 17.34 MW
290051 GSG-6; E Adder 11.1 MW 9.44 MW
295109 WESTBROOK E Adder 5.94 MW 5.05 MW
295111 SUBLETTE E Adder 2.89 MW 2.46 MW
910542 X3-005 E Adder 0.77 MW 0.65 MW
918052 AA1-018 E OP Adder 17.27 MW 14.68 MW
933911 AD1-013 C Adder 1.95 MW 1.66 MW
933912 AD1-013 E Adder 3.12 MW 2.65 MW
934721 AD1-100 C 50/50 3.88 MW 3.88 MW
934722 AD1-100 E 50/50 118.44 MW 118.44 MW
937002 AD2-134 E Adder 10.73 MW 9.12 MW
942991 AE2-321 C Adder 8.62 MW 7.33 MW
942992 AE2-321 E Adder 4.25 MW 3.61 MW
958481 AF2-142 C Adder 11.91 MW 10.12 MW
958482 AF2-142 E Adder 7.94 MW 6.75 MW
958491 AF2-143 C Adder 11.6 MW 9.86 MW
958492 AF2-143 E Adder 7.74 MW 6.58 MW
959351 AF2-226 C Adder 2.65 MW 2.25 MW
959352 AF2-226 E Adder 3.97 MW 3.38 MW
960281 AF2-319 C Adder 2.65 MW 2.25 MW
960282 AF2-319 E Adder 3.97 MW 3.38 MW
960582 AF2-349 E Adder 38.28 MW 32.53 MW
960751 AF2-366 C Adder 7.4 MW 6.29 MW
960752 AF2-366 E Adder 4.94 MW 4.2 MW
274654 BRAIDWOOD;1U 50/50 29.85 MW 29.85 MW
274655 BRAIDWOOD;2U 50/50 29.09 MW 29.09 MW
274660 LASCO STA;1U 50/50 27.28 MW 27.28 MW
274661 LASCO STA;2U 50/50 27.37 MW 27.37 MW
274675 JOLIET 29;7U Adder 76.08 MW 64.67 MW
274676 JOLIET 29;8U Adder 76.08 MW 64.67 MW
274682 WAUKEGAN ;7U Adder 43.47 MW 36.95 MW
274683 WAUKEGAN ;8U Adder 46.87 MW 39.84 MW
274687 WILL CNTY;4U Adder 70.78 MW 60.17 MW
274771 LINCOLN ;2U 50/50 3.06 MW 3.06 MW
274772 LINCOLN ;3U 50/50 3.06 MW 3.06 MW
274773 LINCOLN ;4U 50/50 3.06 MW 3.06 MW
274774 LINCOLN ;5U 50/50 3.06 MW 3.06 MW
274775 LINCOLN ;6U 50/50 3.06 MW 3.06 MW
274776 LINCOLN ;7U 50/50 3.06 MW 3.06 MW
274777 LINCOLN ;8U 50/50 3.06 MW 3.06 MW
274799 UNIV PARK;2U 50/50 1.2 MW 1.2 MW
274847 GR RIDGE ;BU 50/50 0.64 MW 0.64 MW
274863 CAYUGA RI;1U 50/50 0.52 MW 0.52 MW
274864 CAYUGA RI;2U 50/50 0.52 MW 0.52 MW
274871 GR RIDGE ;2U 50/50 0.24 MW 0.24 MW
274887 PILOT HIL;1U 50/50 0.85 MW 0.85 MW
274888 KELLY CRK;1U 50/50 0.85 MW 0.85 MW
276591 L-013 2 Adder 3.88 MW 3.3 MW
293061 N-015 E 50/50 17.14 MW 17.14 MW
293644 O22 E1 Adder 15.22 MW 12.94 MW
293645 O22 E2 Adder 17.43 MW 14.82 MW
294392 P-010 E 50/50 21.76 MW 21.76 MW
933411 AC2-154 C 50/50 2.83 MW 2.83 MW
933412 AC2-154 E 50/50 4.62 MW 4.62 MW
957331 AF2-027 C Adder 2.63 MW 2.23 MW
957332 AF2-027 E Adder 3.94 MW 3.35 MW
274674 JOLIET 9 ;6U Adder 38.7 MW 32.9 MW
274890 CAYUG;1U E 50/50 16.87 MW 16.87 MW
274891 CAYUG;2U E 50/50 16.87 MW 16.87 MW
938851 AE1-113 C Adder 8.41 MW 7.15 MW
938852 AE1-113 E Adder 29.83 MW 25.36 MW
934101 AD2-000 1 Adder 6.17 MW 5.25 MW
934111 AD2-000 2 Adder 6.32 MW 5.37 MW
275149 KELLYCK ;1E 50/50 20.89 MW 20.89 MW
293519 PILOT HIL;1E 50/50 20.89 MW 20.89 MW
290108 LEEDK;1U E Adder 25.47 MW 21.65 MW
916221 Z1-073 E Adder 7.82 MW 6.65 MW
936292 AD2-038 E Adder 15.93 MW 13.54 MW
936371 AD2-047 C 50/50 5.07 MW 5.07 MW
936372 AD2-047 E 50/50 24.77 MW 24.77 MW
936461 AD2-060 C 50/50 2.98 MW 2.98 MW
936511 AD2-066 C Adder 8.98 MW 7.63 MW
936512 AD2-066 E Adder 5.98 MW 5.09 MW
942421 AE2-255 C Adder 3.19 MW 2.71 MW
942422 AE2-255 E Adder 9.56 MW 8.13 MW
942651 AE2-281 C Adder 0.9 MW 0.77 MW
942652 AE2-281 E Adder 5.54 MW 4.71 MW
943121 AE2-341 C Adder 13.59 MW 11.55 MW
943122 AE2-341 E Adder 6.67 MW 5.67 MW
943591 AF1-030 C Adder 9.04 MW 7.68 MW
943592 AF1-030 E Adder 4.47 MW 3.8 MW
960591 AF2-350 C 50/50 8.95 MW 8.95 MW
960592 AF2-350 E 50/50 5.97 MW 5.97 MW
961501 AF2-441 C Adder 10.55 MW 8.97 MW
961502 AF2-441 E Adder 15.83 MW 13.45 MW
930481 AB1-089 C Adder 44.56 MW 37.87 MW
930482 AB1-089 E Adder 2.03 MW 1.72 MW
939321 AE1-163 C Adder 6.32 MW 5.37 MW
939322 AE1-163 E Adder 38.8 MW 32.98 MW
939351 AE1-166 C 50/50 13.2 MW 13.2 MW
939352 AE1-166 E 50/50 12.18 MW 12.18 MW
939401 AE1-172 C 50/50 6.71 MW 6.71 MW
939402 AE1-172 E 50/50 31.41 MW 31.41 MW
946671 AF1-331 C Adder 2.54 MW 2.16 MW
962691 AG1-118 C Adder 23.51 MW 19.98 MW
962692 AG1-118 E Adder 15.67 MW 13.32 MW
941551 AE2-152 C 50/50 15.23 MW 15.23 MW
941552 AE2-152 E 50/50 10.15 MW 10.15 MW
958011 AF2-095 C 50/50 12.89 MW 12.89 MW
958012 AF2-095 E 50/50 8.59 MW 8.59 MW
274798 UNIV PARK;1U 50/50 1.21 MW 1.21 MW
274770 LINCOLN ;1U 50/50 3.06 MW 3.06 MW
276675 AE2-062 E Adder 0.16 MW 0.14 MW
276170 Z1-108 E Adder 3.09 MW 2.63 MW
920272 AA2-123 E Adder 3.04 MW 2.58 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 95.21 MW 95.21 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.37 MW 16.37 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.29 MW 2.29 MW
NY PJM->LTFIMP_NY CLTF 1.23 MW 1.23 MW
WEC LTFEXP_WEC->PJM CLTF 4.12 MW 4.12 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.6 MW 0.6 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.43 MW 1.43 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.65 MW 0.65 MW
MEC LTFEXP_MEC->PJM CLTF 13.9 MW 13.9 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.85 MW 1.85 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.77 MW 3.77 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.02 MW 0.02 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 14.71 MW 14.71 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.87 MW 0.87 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_116-45-L11614__SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
Contingency Name:
COMED_P4_116-45-L11614__SRT-A
CONTINGENCY 'COMED_P4_116-45-L11614__SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270665 CKT 1   /*BLUE ISL ;RT 345.0 - BLUE ISL ; R 345.0
 TRIP BRANCH FROM BUS 270667 TO BUS 270927 CKT 1   /*BLUE ISL ;RT 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 270667 CKT 1   /*GOODINGS ;2R 345.0 - BLUE ISL ;RT 345.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 107.16 %
Rating: 2297.0 MVA
Rating Type: STE
MVA to Mitigate: 2461.53 MVA
MW Contribution: 22.72 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.7 MW 1.44 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C Adder 4.32 MW 3.67 MW
962782 AG1-127 E Adder 2.88 MW 2.44 MW
966091 AG1-478 C Adder 1.07 MW 0.91 MW
966092 AG1-478 E Adder 0.27 MW 0.23 MW
966441 AG1-513 C Adder 0.31 MW 0.26 MW
966442 AG1-513 E Adder 0.46 MW 0.39 MW
290021 O50 E Adder 24.69 MW 20.98 MW
290051 GSG-6; E Adder 6.76 MW 5.74 MW
295109 WESTBROOK E Adder 3.62 MW 3.07 MW
295111 SUBLETTE E Adder 1.76 MW 1.5 MW
918052 AA1-018 E OP Adder 18.79 MW 15.97 MW
933911 AD1-013 C Adder 1.19 MW 1.01 MW
933912 AD1-013 E Adder 1.89 MW 1.61 MW
937002 AD2-134 E Adder 6.53 MW 5.55 MW
937312 AD2-172 E Adder 2.34 MW 1.99 MW
937401 AD2-194 1 50/50 1.95 MW 1.95 MW
937411 AD2-194 2 50/50 1.96 MW 1.96 MW
942991 AE2-321 C Adder 5.48 MW 4.66 MW
942992 AE2-321 E Adder 2.7 MW 2.3 MW
958481 AF2-142 C Adder 12.96 MW 11.02 MW
958482 AF2-142 E Adder 8.64 MW 7.34 MW
958491 AF2-143 C Adder 13.1 MW 11.13 MW
958492 AF2-143 E Adder 8.73 MW 7.42 MW
958912 AF2-182 E Adder 24.3 MW 20.66 MW
959081 AF2-199 C Adder 4.98 MW 4.23 MW
959082 AF2-199 E Adder 2.49 MW 2.11 MW
959351 AF2-226 C 50/50 5.96 MW 5.96 MW
959352 AF2-226 E 50/50 8.94 MW 8.94 MW
960281 AF2-319 C 50/50 5.96 MW 5.96 MW
960282 AF2-319 E 50/50 8.94 MW 8.94 MW
960582 AF2-349 E Adder 24.51 MW 20.84 MW
960751 AF2-366 C Adder 4.31 MW 3.66 MW
960752 AF2-366 E Adder 2.87 MW 2.44 MW
274675 JOLIET 29;7U Adder 63.43 MW 53.92 MW
274676 JOLIET 29;8U Adder 63.88 MW 54.29 MW
274682 WAUKEGAN ;7U Adder 28.12 MW 23.91 MW
274683 WAUKEGAN ;8U Adder 30.27 MW 25.73 MW
274728 ELWOOD EC;5P 50/50 5.03 MW 5.03 MW
274729 ELWOOD EC;1P 50/50 5.0 MW 5.0 MW
274730 ELWOOD EC;6P 50/50 5.03 MW 5.03 MW
274731 ELWOOD EC;2P 50/50 5.0 MW 5.0 MW
274732 ELWOOD EC;7P 50/50 5.03 MW 5.03 MW
274734 ELWOOD EC;8P 50/50 5.03 MW 5.03 MW
274735 ELWOOD EC;4P 50/50 5.0 MW 5.0 MW
274736 ELWOOD EC;9P 50/50 5.03 MW 5.03 MW
274859 EASYR;U1 E Adder 8.49 MW 7.22 MW
274860 EASYR;U2 E Adder 8.49 MW 7.22 MW
274861 TOP CROP ;1U 50/50 0.89 MW 0.89 MW
274862 TOP CROP ;2U 50/50 1.7 MW 1.7 MW
276591 L-013 2 Adder 2.32 MW 1.97 MW
293644 O22 E1 50/50 34.23 MW 34.23 MW
293645 O22 E2 50/50 39.21 MW 39.21 MW
293715 O-029 E Adder 7.21 MW 6.13 MW
293716 O-029 E Adder 3.95 MW 3.36 MW
293717 O-029 E Adder 3.63 MW 3.09 MW
293771 O-035 E Adder 5.29 MW 4.49 MW
294401 BSHIL;1U E Adder 6.88 MW 5.84 MW
294410 BSHIL;2U E Adder 6.88 MW 5.84 MW
294763 P-046 E Adder 6.51 MW 5.54 MW
925582 AC1-033 E Adder 7.54 MW 6.41 MW
939061 AE1-134 2 Adder 0.99 MW 0.84 MW
940502 AE2-035 E Adder 2.34 MW 1.99 MW
957331 AF2-027 C Adder 1.7 MW 1.44 MW
957332 AF2-027 E Adder 2.54 MW 2.16 MW
957471 AF2-041 C Adder 14.92 MW 12.69 MW
957472 AF2-041 E Adder 7.46 MW 6.34 MW
938851 AE1-113 C Adder 10.18 MW 8.66 MW
938852 AE1-113 E Adder 36.1 MW 30.69 MW
934101 AD2-000 1 Adder 5.42 MW 4.6 MW
934111 AD2-000 2 Adder 7.5 MW 6.38 MW
276640 AC1-204 GEN1 50/50 18.62 MW 18.62 MW
276642 AC1-204 GEN2 50/50 18.72 MW 18.72 MW
293516 O-009 E Adder 13.94 MW 11.85 MW
916212 CRESCENT ;1U Adder 3.71 MW 3.16 MW
927208 AC1-214 E1 Adder 2.51 MW 2.13 MW
927209 AC1-214 E2 Adder 2.51 MW 2.13 MW
957751 AF2-069 C Adder 0.17 MW 0.14 MW
957752 AF2-069 E Adder 0.53 MW 0.45 MW
990901 L-005 E Adder 10.57 MW 8.99 MW
290108 LEEDK;1U E Adder 14.99 MW 12.74 MW
916221 Z1-073 E Adder 4.76 MW 4.05 MW
926821 AC1-168 C Adder 0.72 MW 0.61 MW
926822 AC1-168 E Adder 4.86 MW 4.13 MW
934051 AD1-031 C Adder 2.3 MW 1.96 MW
934052 AD1-031 E Adder 3.75 MW 3.19 MW
936292 AD2-038 E Adder 17.99 MW 15.29 MW
936511 AD2-066 C Adder 6.53 MW 5.55 MW
936512 AD2-066 E Adder 4.36 MW 3.7 MW
942421 AE2-255 C Adder 3.86 MW 3.28 MW
942422 AE2-255 E Adder 11.57 MW 9.84 MW
942651 AE2-281 C Adder 1.02 MW 0.87 MW
942652 AE2-281 E Adder 6.26 MW 5.32 MW
943121 AE2-341 C Adder 6.57 MW 5.59 MW
943122 AE2-341 E Adder 3.23 MW 2.74 MW
943591 AF1-030 C Adder 4.37 MW 3.71 MW
943592 AF1-030 E Adder 2.16 MW 1.84 MW
959091 AF2-200 C Adder 9.95 MW 8.46 MW
959092 AF2-200 E Adder 6.63 MW 5.64 MW
961011 AF2-392 C Adder 2.85 MW 2.42 MW
961012 AF2-392 E Adder 13.24 MW 11.26 MW
966822 AG1-553 E Adder 20.7 MW 17.6 MW
930481 AB1-089 C Adder 44.73 MW 38.02 MW
930482 AB1-089 E Adder 2.03 MW 1.73 MW
938861 AE1-114 C Adder 2.74 MW 2.33 MW
938862 AE1-114 E Adder 9.36 MW 7.96 MW
939321 AE1-163 C Adder 7.13 MW 6.06 MW
939322 AE1-163 E Adder 43.81 MW 37.24 MW
946152 AF1-280 E Adder 16.2 MW 13.77 MW
946321 AF1-296 C Adder 2.67 MW 2.27 MW
946322 AF1-296 E Adder 12.5 MW 10.63 MW
946671 AF1-331 C Adder 1.54 MW 1.31 MW
962691 AG1-118 C Adder 13.63 MW 11.59 MW
962692 AG1-118 E Adder 9.09 MW 7.72 MW
965931 AG1-462 C Adder 12.18 MW 10.36 MW
965932 AG1-462 E Adder 8.12 MW 6.9 MW
276170 Z1-108 E Adder 1.95 MW 1.65 MW
920272 AA2-123 E Adder 1.93 MW 1.64 MW
276626 AG1-044 E Adder 0.05 MW 0.05 MW
954983 J974 C External Queue 3.3 MW 3.3 MW
954984 J974 E External Queue 17.86 MW 17.86 MW
990547 J1333 G External Queue -22.91 MW -22.91 MW
990552 J1334 G External Queue -22.91 MW -22.91 MW
990557 J1335 G External Queue -22.91 MW -22.91 MW
990562 J1336 G External Queue -22.91 MW -22.91 MW
990577 J1339 External Queue -27.1 MW -27.1 MW
990582 J1340 External Queue -27.1 MW -27.1 MW
990647 J1355 External Queue -9.39 MW -9.39 MW
990662 J1358 External Queue -11.46 MW -11.46 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 56.87 MW 56.87 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.0 MW 11.0 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.17 MW 1.17 MW
NY PJM->LTFIMP_NY CLTF 0.63 MW 0.63 MW
WEC LTFEXP_WEC->PJM CLTF 2.69 MW 2.69 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.23 MW 0.23 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.11 MW 0.11 MW
TVA LTFEXP_TVA->PJM CLTF 1.17 MW 1.17 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.36 MW 0.36 MW
MEC LTFEXP_MEC->PJM CLTF 10.04 MW 10.04 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.04 MW 1.04 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.84 MW 2.84 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.48 MW 7.48 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.35 MW 0.35 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_116-45-TR82____SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
Contingency Name:
COMED_P4_116-45-TR82____SRT-A
CONTINGENCY 'COMED_P4_116-45-TR82____SRT-A'
 DISCONNECT BUS 270769                                          /*GOODINGS ;2R 345.0
 TRIP BRANCH FROM BUS 270769 TO BUS 271565 TO BUS 275324 CKT 1  /*GOODINGS ;2R 345.0 - GOODINGS ; R 138.0 - GOODINGS ;2C  34.5
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 103.69 %
Rating: 2297.0 MVA
Rating Type: STE
MVA to Mitigate: 2381.75 MVA
MW Contribution: 22.67 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.69 MW 1.44 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C Adder 4.31 MW 3.67 MW
962782 AG1-127 E Adder 2.87 MW 2.44 MW
966091 AG1-478 C Adder 1.08 MW 0.92 MW
966092 AG1-478 E Adder 0.27 MW 0.23 MW
966441 AG1-513 C Adder 0.31 MW 0.26 MW
966442 AG1-513 E Adder 0.46 MW 0.39 MW
290021 O50 E Adder 24.7 MW 21.0 MW
290051 GSG-6; E Adder 6.74 MW 5.73 MW
295109 WESTBROOK E Adder 3.61 MW 3.07 MW
295111 SUBLETTE E Adder 1.75 MW 1.49 MW
918052 AA1-018 E OP Adder 18.79 MW 15.97 MW
933911 AD1-013 C Adder 1.18 MW 1.01 MW
933912 AD1-013 E Adder 1.89 MW 1.61 MW
937002 AD2-134 E Adder 6.52 MW 5.54 MW
937312 AD2-172 E Adder 2.34 MW 1.99 MW
937401 AD2-194 1 50/50 1.95 MW 1.95 MW
937411 AD2-194 2 50/50 1.96 MW 1.96 MW
942991 AE2-321 C Adder 5.49 MW 4.66 MW
942992 AE2-321 E Adder 2.7 MW 2.3 MW
958481 AF2-142 C Adder 12.96 MW 11.02 MW
958482 AF2-142 E Adder 8.64 MW 7.34 MW
958491 AF2-143 C Adder 13.1 MW 11.13 MW
958492 AF2-143 E Adder 8.73 MW 7.42 MW
958912 AF2-182 E Adder 24.27 MW 20.63 MW
959081 AF2-199 C Adder 4.97 MW 4.22 MW
959082 AF2-199 E Adder 2.48 MW 2.11 MW
959351 AF2-226 C 50/50 5.97 MW 5.97 MW
959352 AF2-226 E 50/50 8.95 MW 8.95 MW
960281 AF2-319 C 50/50 5.97 MW 5.97 MW
960282 AF2-319 E 50/50 8.95 MW 8.95 MW
960582 AF2-349 E Adder 24.52 MW 20.84 MW
960751 AF2-366 C Adder 4.3 MW 3.65 MW
960752 AF2-366 E Adder 2.87 MW 2.44 MW
274675 JOLIET 29;7U Adder 63.96 MW 54.37 MW
274676 JOLIET 29;8U Adder 64.41 MW 54.74 MW
274682 WAUKEGAN ;7U Adder 28.23 MW 24.0 MW
274683 WAUKEGAN ;8U Adder 30.39 MW 25.83 MW
274728 ELWOOD EC;5P 50/50 5.04 MW 5.04 MW
274729 ELWOOD EC;1P 50/50 5.01 MW 5.01 MW
274730 ELWOOD EC;6P 50/50 5.04 MW 5.04 MW
274731 ELWOOD EC;2P 50/50 5.01 MW 5.01 MW
274732 ELWOOD EC;7P 50/50 5.04 MW 5.04 MW
274734 ELWOOD EC;8P 50/50 5.04 MW 5.04 MW
274735 ELWOOD EC;4P 50/50 5.01 MW 5.01 MW
274736 ELWOOD EC;9P 50/50 5.04 MW 5.04 MW
274859 EASYR;U1 E Adder 8.48 MW 7.21 MW
274860 EASYR;U2 E Adder 8.48 MW 7.21 MW
274861 TOP CROP ;1U 50/50 0.9 MW 0.9 MW
274862 TOP CROP ;2U 50/50 1.71 MW 1.71 MW
276591 L-013 2 Adder 2.32 MW 1.97 MW
293644 O22 E1 50/50 34.29 MW 34.29 MW
293645 O22 E2 50/50 39.28 MW 39.28 MW
293715 O-029 E Adder 7.19 MW 6.11 MW
293716 O-029 E Adder 3.94 MW 3.35 MW
293717 O-029 E Adder 3.62 MW 3.08 MW
293771 O-035 E Adder 5.26 MW 4.47 MW
294401 BSHIL;1U E Adder 6.85 MW 5.82 MW
294410 BSHIL;2U E Adder 6.85 MW 5.82 MW
294763 P-046 E Adder 6.51 MW 5.53 MW
925582 AC1-033 E Adder 7.5 MW 6.38 MW
939061 AE1-134 2 Adder 0.99 MW 0.84 MW
940502 AE2-035 E Adder 2.34 MW 1.99 MW
957331 AF2-027 C Adder 1.7 MW 1.45 MW
957332 AF2-027 E Adder 2.55 MW 2.17 MW
957471 AF2-041 C Adder 14.9 MW 12.66 MW
957472 AF2-041 E Adder 7.45 MW 6.33 MW
938851 AE1-113 C Adder 10.19 MW 8.66 MW
938852 AE1-113 E Adder 36.13 MW 30.71 MW
934101 AD2-000 1 Adder 5.39 MW 4.58 MW
934111 AD2-000 2 Adder 7.52 MW 6.39 MW
276640 AC1-204 GEN1 50/50 18.63 MW 18.63 MW
276642 AC1-204 GEN2 50/50 18.74 MW 18.74 MW
293516 O-009 E Adder 13.91 MW 11.82 MW
916212 CRESCENT ;1U Adder 3.69 MW 3.14 MW
927208 AC1-214 E1 Adder 2.49 MW 2.12 MW
927209 AC1-214 E2 Adder 2.49 MW 2.12 MW
957751 AF2-069 C Adder 0.16 MW 0.14 MW
957752 AF2-069 E Adder 0.53 MW 0.45 MW
990901 L-005 E Adder 10.52 MW 8.95 MW
290108 LEEDK;1U E Adder 14.95 MW 12.71 MW
916221 Z1-073 E Adder 4.75 MW 4.04 MW
926821 AC1-168 C Adder 0.72 MW 0.61 MW
926822 AC1-168 E Adder 4.81 MW 4.09 MW
934051 AD1-031 C Adder 2.29 MW 1.95 MW
934052 AD1-031 E Adder 3.74 MW 3.17 MW
936292 AD2-038 E Adder 17.98 MW 15.29 MW
936511 AD2-066 C Adder 6.54 MW 5.56 MW
936512 AD2-066 E Adder 4.36 MW 3.7 MW
942421 AE2-255 C Adder 3.86 MW 3.28 MW
942422 AE2-255 E Adder 11.58 MW 9.84 MW
942651 AE2-281 C Adder 1.02 MW 0.87 MW
942652 AE2-281 E Adder 6.26 MW 5.32 MW
943121 AE2-341 C Adder 6.53 MW 5.55 MW
943122 AE2-341 E Adder 3.21 MW 2.73 MW
943591 AF1-030 C Adder 4.34 MW 3.69 MW
943592 AF1-030 E Adder 2.15 MW 1.83 MW
959091 AF2-200 C Adder 9.93 MW 8.44 MW
959092 AF2-200 E Adder 6.62 MW 5.63 MW
961011 AF2-392 C Adder 2.84 MW 2.41 MW
961012 AF2-392 E Adder 13.22 MW 11.23 MW
966822 AG1-553 E Adder 20.66 MW 17.56 MW
930481 AB1-089 C Adder 44.7 MW 37.99 MW
930482 AB1-089 E Adder 2.03 MW 1.73 MW
938861 AE1-114 C Adder 2.74 MW 2.33 MW
938862 AE1-114 E Adder 9.35 MW 7.95 MW
939321 AE1-163 C Adder 7.13 MW 6.06 MW
939322 AE1-163 E Adder 43.8 MW 37.23 MW
946152 AF1-280 E Adder 16.18 MW 13.75 MW
946321 AF1-296 C Adder 2.66 MW 2.27 MW
946322 AF1-296 E Adder 12.48 MW 10.61 MW
946671 AF1-331 C Adder 1.54 MW 1.31 MW
962691 AG1-118 C Adder 13.6 MW 11.56 MW
962692 AG1-118 E Adder 9.07 MW 7.71 MW
965931 AG1-462 C Adder 12.16 MW 10.33 MW
965932 AG1-462 E Adder 8.11 MW 6.89 MW
276170 Z1-108 E Adder 1.95 MW 1.66 MW
920272 AA2-123 E Adder 1.93 MW 1.64 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
954983 J974 C External Queue 3.28 MW 3.28 MW
954984 J974 E External Queue 17.76 MW 17.76 MW
990547 J1333 G External Queue -21.52 MW -21.52 MW
990552 J1334 G External Queue -21.52 MW -21.52 MW
990557 J1335 G External Queue -21.52 MW -21.52 MW
990562 J1336 G External Queue -21.52 MW -21.52 MW
990577 J1339 External Queue -25.87 MW -25.87 MW
990582 J1340 External Queue -25.87 MW -25.87 MW
990647 J1355 External Queue -9.06 MW -9.06 MW
990662 J1358 External Queue -10.73 MW -10.73 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 57.54 MW 57.54 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.9 MW 10.9 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.16 MW 1.16 MW
NY PJM->LTFIMP_NY CLTF 0.62 MW 0.62 MW
WEC LTFEXP_WEC->PJM CLTF 2.7 MW 2.7 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.22 MW 0.22 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.11 MW 0.11 MW
TVA LTFEXP_TVA->PJM CLTF 1.16 MW 1.16 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.36 MW 0.36 MW
MEC LTFEXP_MEC->PJM CLTF 10.01 MW 10.01 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.04 MW 1.04 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.82 MW 2.82 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.42 MW 7.42 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.35 MW 0.35 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P4_116-45-L0303___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
Contingency Name:
COMED_P4_116-45-L0303___SRT-A
CONTINGENCY 'COMED_P4_116-45-L0303___SRT-A'
 DISCONNECT BUS 270769                             /*GOODINGS ;2R 345.0
 REMOVE SWSHUNT FROM BUS 270827                    /*NEVADA   ; R 345.0
 TRIP BRANCH FROM BUS 936290 TO BUS 270827 CKT 1   /*AD2-038 TP   345.0 - NEVADA   ; R 345.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 102.07 %
Rating: 2297.0 MVA
Rating Type: STE
MVA to Mitigate: 2344.58 MVA
MW Contribution: 22.67 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.69 MW 1.44 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C Adder 4.31 MW 3.67 MW
962782 AG1-127 E Adder 2.87 MW 2.44 MW
966091 AG1-478 C Adder 1.08 MW 0.92 MW
966092 AG1-478 E Adder 0.27 MW 0.23 MW
966441 AG1-513 C Adder 0.31 MW 0.26 MW
966442 AG1-513 E Adder 0.46 MW 0.39 MW
290021 O50 E Adder 24.71 MW 21.0 MW
290051 GSG-6; E Adder 6.74 MW 5.73 MW
295109 WESTBROOK E Adder 3.61 MW 3.07 MW
295111 SUBLETTE E Adder 1.75 MW 1.49 MW
933911 AD1-013 C Adder 1.18 MW 1.01 MW
933912 AD1-013 E Adder 1.89 MW 1.61 MW
937002 AD2-134 E Adder 6.52 MW 5.54 MW
937312 AD2-172 E Adder 2.34 MW 1.99 MW
937401 AD2-194 1 50/50 1.95 MW 1.95 MW
937411 AD2-194 2 50/50 1.96 MW 1.96 MW
942991 AE2-321 C Adder 5.49 MW 4.66 MW
942992 AE2-321 E Adder 2.7 MW 2.3 MW
958491 AF2-143 C Adder 13.1 MW 11.13 MW
958492 AF2-143 E Adder 8.73 MW 7.42 MW
958912 AF2-182 E Adder 24.27 MW 20.63 MW
959081 AF2-199 C Adder 4.97 MW 4.22 MW
959082 AF2-199 E Adder 2.48 MW 2.11 MW
959351 AF2-226 C 50/50 5.97 MW 5.97 MW
959352 AF2-226 E 50/50 8.95 MW 8.95 MW
960281 AF2-319 C 50/50 5.97 MW 5.97 MW
960282 AF2-319 E 50/50 8.95 MW 8.95 MW
960582 AF2-349 E Adder 24.52 MW 20.84 MW
960751 AF2-366 C Adder 4.3 MW 3.66 MW
960752 AF2-366 E Adder 2.87 MW 2.44 MW
274675 JOLIET 29;7U Adder 63.97 MW 54.38 MW
274676 JOLIET 29;8U Adder 64.41 MW 54.75 MW
274682 WAUKEGAN ;7U Adder 28.24 MW 24.0 MW
274683 WAUKEGAN ;8U Adder 30.39 MW 25.83 MW
274728 ELWOOD EC;5P 50/50 5.04 MW 5.04 MW
274729 ELWOOD EC;1P 50/50 5.01 MW 5.01 MW
274730 ELWOOD EC;6P 50/50 5.04 MW 5.04 MW
274731 ELWOOD EC;2P 50/50 5.01 MW 5.01 MW
274732 ELWOOD EC;7P 50/50 5.04 MW 5.04 MW
274734 ELWOOD EC;8P 50/50 5.04 MW 5.04 MW
274735 ELWOOD EC;4P 50/50 5.01 MW 5.01 MW
274736 ELWOOD EC;9P 50/50 5.04 MW 5.04 MW
274859 EASYR;U1 E Adder 8.48 MW 7.21 MW
274860 EASYR;U2 E Adder 8.48 MW 7.21 MW
274861 TOP CROP ;1U 50/50 0.9 MW 0.9 MW
274862 TOP CROP ;2U 50/50 1.71 MW 1.71 MW
276591 L-013 2 Adder 2.32 MW 1.97 MW
293644 O22 E1 50/50 34.3 MW 34.3 MW
293645 O22 E2 50/50 39.28 MW 39.28 MW
293715 O-029 E Adder 7.19 MW 6.11 MW
293716 O-029 E Adder 3.94 MW 3.35 MW
293717 O-029 E Adder 3.62 MW 3.08 MW
293771 O-035 E Adder 5.26 MW 4.47 MW
294401 BSHIL;1U E Adder 6.85 MW 5.82 MW
294410 BSHIL;2U E Adder 6.85 MW 5.82 MW
294763 P-046 E Adder 6.51 MW 5.53 MW
925582 AC1-033 E Adder 7.51 MW 6.38 MW
939061 AE1-134 2 Adder 0.99 MW 0.84 MW
940502 AE2-035 E Adder 2.34 MW 1.99 MW
957331 AF2-027 C Adder 1.7 MW 1.45 MW
957332 AF2-027 E Adder 2.55 MW 2.17 MW
957471 AF2-041 C Adder 14.9 MW 12.67 MW
957472 AF2-041 E Adder 7.45 MW 6.33 MW
938851 AE1-113 C Adder 10.19 MW 8.66 MW
938852 AE1-113 E Adder 36.13 MW 30.71 MW
934101 AD2-000 1 Adder 5.39 MW 4.58 MW
934111 AD2-000 2 Adder 7.52 MW 6.39 MW
276640 AC1-204 GEN1 50/50 18.63 MW 18.63 MW
276642 AC1-204 GEN2 50/50 18.74 MW 18.74 MW
293516 O-009 E Adder 13.91 MW 11.82 MW
916212 CRESCENT ;1U Adder 3.7 MW 3.14 MW
927208 AC1-214 E1 Adder 2.49 MW 2.12 MW
927209 AC1-214 E2 Adder 2.49 MW 2.12 MW
957751 AF2-069 C Adder 0.16 MW 0.14 MW
957752 AF2-069 E Adder 0.53 MW 0.45 MW
990901 L-005 E Adder 10.52 MW 8.95 MW
290108 LEEDK;1U E Adder 14.95 MW 12.71 MW
916221 Z1-073 E Adder 4.75 MW 4.04 MW
926821 AC1-168 C Adder 0.72 MW 0.61 MW
926822 AC1-168 E Adder 4.81 MW 4.09 MW
934051 AD1-031 C Adder 2.29 MW 1.95 MW
934052 AD1-031 E Adder 3.74 MW 3.17 MW
936292 AD2-038 E Adder 17.99 MW 15.29 MW
936511 AD2-066 C Adder 6.54 MW 5.56 MW
936512 AD2-066 E Adder 4.36 MW 3.71 MW
942421 AE2-255 C Adder 3.86 MW 3.28 MW
942422 AE2-255 E Adder 11.58 MW 9.84 MW
942651 AE2-281 C Adder 1.02 MW 0.87 MW
942652 AE2-281 E Adder 6.26 MW 5.32 MW
943121 AE2-341 C Adder 6.53 MW 5.55 MW
943122 AE2-341 E Adder 3.21 MW 2.73 MW
943591 AF1-030 C Adder 4.34 MW 3.69 MW
943592 AF1-030 E Adder 2.15 MW 1.83 MW
959091 AF2-200 C Adder 9.93 MW 8.44 MW
959092 AF2-200 E Adder 6.62 MW 5.63 MW
961011 AF2-392 C Adder 2.84 MW 2.42 MW
961012 AF2-392 E Adder 13.22 MW 11.24 MW
966822 AG1-553 E Adder 20.66 MW 17.57 MW
930481 AB1-089 C Adder 44.7 MW 38.0 MW
930482 AB1-089 E Adder 2.03 MW 1.73 MW
938861 AE1-114 C Adder 2.74 MW 2.33 MW
938862 AE1-114 E Adder 9.36 MW 7.95 MW
939321 AE1-163 C Adder 7.13 MW 6.06 MW
939322 AE1-163 E Adder 43.8 MW 37.23 MW
946152 AF1-280 E Adder 16.18 MW 13.76 MW
946321 AF1-296 C Adder 2.67 MW 2.27 MW
946322 AF1-296 E Adder 12.48 MW 10.61 MW
946671 AF1-331 C Adder 1.54 MW 1.31 MW
962691 AG1-118 C Adder 13.6 MW 11.56 MW
962692 AG1-118 E Adder 9.07 MW 7.71 MW
965931 AG1-462 C Adder 12.16 MW 10.34 MW
965932 AG1-462 E Adder 8.11 MW 6.89 MW
276170 Z1-108 E Adder 1.95 MW 1.66 MW
920272 AA2-123 E Adder 1.93 MW 1.64 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
954983 J974 C External Queue 3.28 MW 3.28 MW
954984 J974 E External Queue 17.76 MW 17.76 MW
990547 J1333 G External Queue -21.52 MW -21.52 MW
990552 J1334 G External Queue -21.52 MW -21.52 MW
990557 J1335 G External Queue -21.52 MW -21.52 MW
990562 J1336 G External Queue -21.52 MW -21.52 MW
990577 J1339 External Queue -25.87 MW -25.87 MW
990582 J1340 External Queue -25.87 MW -25.87 MW
990647 J1355 External Queue -9.06 MW -9.06 MW
990662 J1358 External Queue -10.73 MW -10.73 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 57.57 MW 57.57 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.91 MW 10.91 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.16 MW 1.16 MW
NY PJM->LTFIMP_NY CLTF 0.62 MW 0.62 MW
WEC LTFEXP_WEC->PJM CLTF 2.7 MW 2.7 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.22 MW 0.22 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.11 MW 0.11 MW
TVA LTFEXP_TVA->PJM CLTF 1.16 MW 1.16 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.36 MW 0.36 MW
MEC LTFEXP_MEC->PJM CLTF 10.01 MW 10.01 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.04 MW 1.04 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.82 MW 2.82 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.41 MW 7.41 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.35 MW 0.35 MW

Details for 05DUMONT-05SORENS 765.0 kV Ckt 1 line l/o AEP_P4_#7334_05JEFRSO 765_A2_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP
Facility Description:
05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
Contingency Name:
AEP_P4_#7334_05JEFRSO 765_A2_SRT-A
CONTINGENCY 'AEP_P4_#7334_05JEFRSO 765_A2_SRT-A'
 OPEN BRANCH FROM BUS 242865 TO BUS 243208 CKT 2    /*05JEFRSO     345.0 - 05JEFRSO     765.0
 OPEN BRANCH FROM BUS 242865 TO BUS 248000 CKT Z1   /*05JEFRSO     345.0 - 06CLIFTY     345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1    /*05HANG R     765.0 - 05JEFRSO     765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 112.18 %
Rating: 4142.0 MVA
Rating Type: B
MVA to Mitigate: 4646.47 MVA
MW Contribution: 68.72 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 4.94 MW 4.2 MW
962781 AG1-127 C Adder 13.04 MW 11.08 MW
962782 AG1-127 E Adder 8.68 MW 7.38 MW
965681 AG1-436 C Adder 17.86 MW 15.18 MW
965682 AG1-436 E Adder 11.9 MW 10.12 MW
966091 AG1-478 C Adder 3.73 MW 3.17 MW
966092 AG1-478 E Adder 0.94 MW 0.8 MW
966431 AG1-512 C Adder 3.79 MW 3.22 MW
966432 AG1-512 E Adder 5.69 MW 4.83 MW
966441 AG1-513 C Adder 0.94 MW 0.8 MW
966442 AG1-513 E Adder 1.41 MW 1.2 MW
247967 05OLIV SLR E Adder 0.56 MW 0.48 MW
290021 O50 E Adder 35.86 MW 30.48 MW
290051 GSG-6; E Adder 19.65 MW 16.7 MW
295109 WESTBROOK E Adder 10.52 MW 8.94 MW
295111 SUBLETTE E Adder 5.11 MW 4.35 MW
910542 X3-005 E Adder 1.33 MW 1.13 MW
918052 AA1-018 E OP Adder 29.73 MW 25.27 MW
933911 AD1-013 C Adder 3.46 MW 2.94 MW
933912 AD1-013 E Adder 5.52 MW 4.69 MW
934722 AD1-100 E Adder 166.41 MW 141.45 MW
937002 AD2-134 E Adder 19.0 MW 16.15 MW
942991 AE2-321 C Adder 15.15 MW 12.88 MW
942992 AE2-321 E Adder 7.46 MW 6.34 MW
958481 AF2-142 C Adder 20.5 MW 17.43 MW
958482 AF2-142 E Adder 13.67 MW 11.62 MW
958491 AF2-143 C Adder 20.22 MW 17.18 MW
958492 AF2-143 E Adder 13.48 MW 11.46 MW
959351 AF2-226 C Adder 4.56 MW 3.87 MW
959352 AF2-226 E Adder 6.84 MW 5.81 MW
960281 AF2-319 C Adder 4.56 MW 3.87 MW
960282 AF2-319 E Adder 6.84 MW 5.81 MW
960582 AF2-349 E Adder 67.42 MW 57.31 MW
960681 AF2-359 C Adder 17.86 MW 15.18 MW
960682 AF2-359 E Adder 11.9 MW 10.12 MW
960751 AF2-366 C Adder 13.0 MW 11.05 MW
960752 AF2-366 E Adder 8.67 MW 7.37 MW
243441 05CKG2 50/50 60.08 MW 60.08 MW
274660 LASCO STA;1U 50/50 44.09 MW 44.09 MW
274661 LASCO STA;2U 50/50 44.23 MW 44.23 MW
274675 JOLIET 29;7U Adder 129.55 MW 110.12 MW
274676 JOLIET 29;8U Adder 129.55 MW 110.12 MW
274682 WAUKEGAN ;7U Adder 75.48 MW 64.16 MW
274683 WAUKEGAN ;8U Adder 81.44 MW 69.22 MW
274687 WILL CNTY;4U Adder 120.06 MW 102.05 MW
274771 LINCOLN ;2U 50/50 3.15 MW 3.15 MW
274772 LINCOLN ;3U 50/50 3.15 MW 3.15 MW
274773 LINCOLN ;4U 50/50 3.15 MW 3.15 MW
274774 LINCOLN ;5U 50/50 3.15 MW 3.15 MW
274775 LINCOLN ;6U 50/50 3.15 MW 3.15 MW
274776 LINCOLN ;7U 50/50 3.15 MW 3.15 MW
274777 LINCOLN ;8U 50/50 3.15 MW 3.15 MW
274788 SE CHICAG;5U Adder 8.75 MW 7.43 MW
274789 SE CHICAG;6U Adder 8.75 MW 7.43 MW
274790 SE CHICAG;7U Adder 8.75 MW 7.43 MW
274791 SE CHICAG;8U Adder 8.75 MW 7.43 MW
274792 SE CHICAG;9U Adder 8.74 MW 7.43 MW
274793 SE CHICAG;0U Adder 8.74 MW 7.43 MW
274794 SE CHICAG;1U Adder 8.74 MW 7.43 MW
274795 SE CHICAG;2U Adder 8.74 MW 7.43 MW
276591 L-013 2 Adder 6.75 MW 5.74 MW
293061 N-015 E Adder 28.27 MW 24.03 MW
293644 O22 E1 Adder 26.18 MW 22.26 MW
293645 O22 E2 Adder 29.99 MW 25.49 MW
294392 P-010 E Adder 35.91 MW 30.52 MW
933411 AC2-154 C Adder 4.5 MW 3.83 MW
933412 AC2-154 E Adder 7.34 MW 6.24 MW
957331 AF2-027 C Adder 4.58 MW 3.89 MW
957332 AF2-027 E Adder 6.86 MW 5.83 MW
274674 JOLIET 9 ;6U Adder 66.1 MW 56.18 MW
274890 CAYUG;1U E Adder 26.79 MW 22.77 MW
274891 CAYUG;2U E Adder 26.79 MW 22.77 MW
938851 AE1-113 C Adder 14.79 MW 12.57 MW
938852 AE1-113 E Adder 52.45 MW 44.58 MW
934101 AD2-000 1 Adder 10.81 MW 9.19 MW
934111 AD2-000 2 Adder 10.84 MW 9.21 MW
270100 AB1-080 CT1 50/50 9.03 MW 9.03 MW
270101 AB1-080 CT2 50/50 9.03 MW 9.03 MW
270102 AB1-080 ST 50/50 9.77 MW 9.77 MW
274708 KENDALL ;3C 50/50 7.18 MW 7.18 MW
274709 KENDALL ;3S 50/50 4.75 MW 4.75 MW
274710 KENDALL ;4C 50/50 7.1 MW 7.1 MW
274711 KENDALL ;4S 50/50 4.75 MW 4.75 MW
275149 KELLYCK ;1E Adder 33.17 MW 28.2 MW
293519 PILOT HIL;1E Adder 33.17 MW 28.2 MW
290108 LEEDK;1U E Adder 44.84 MW 38.11 MW
916221 Z1-073 E Adder 13.84 MW 11.77 MW
936292 AD2-038 E Adder 27.76 MW 23.6 MW
936371 AD2-047 C Adder 8.06 MW 6.85 MW
936372 AD2-047 E Adder 39.33 MW 33.43 MW
936461 AD2-060 C Adder 4.74 MW 4.03 MW
936511 AD2-066 C Adder 15.69 MW 13.34 MW
936512 AD2-066 E Adder 10.46 MW 8.89 MW
942421 AE2-255 C Adder 5.6 MW 4.76 MW
942422 AE2-255 E Adder 16.81 MW 14.29 MW
942651 AE2-281 C Adder 1.57 MW 1.34 MW
942652 AE2-281 E Adder 9.66 MW 8.21 MW
943121 AE2-341 C Adder 23.66 MW 20.11 MW
943122 AE2-341 E Adder 11.62 MW 9.88 MW
943591 AF1-030 C Adder 15.74 MW 13.38 MW
943592 AF1-030 E Adder 7.79 MW 6.62 MW
960591 AF2-350 C Adder 14.22 MW 12.08 MW
960592 AF2-350 E Adder 9.48 MW 8.06 MW
961501 AF2-441 C Adder 18.96 MW 16.11 MW
961502 AF2-441 E Adder 28.44 MW 24.17 MW
930481 AB1-089 C Adder 48.87 MW 41.54 MW
939321 AE1-163 C Adder 11.01 MW 9.36 MW
939322 AE1-163 E Adder 67.61 MW 57.47 MW
939351 AE1-166 C Adder 18.54 MW 15.76 MW
939352 AE1-166 E Adder 17.12 MW 14.55 MW
939401 AE1-172 C Adder 10.22 MW 8.69 MW
939402 AE1-172 E Adder 47.84 MW 40.66 MW
946671 AF1-331 C Adder 4.49 MW 3.82 MW
962691 AG1-118 C Adder 41.23 MW 35.05 MW
962692 AG1-118 E Adder 27.49 MW 23.36 MW
941551 AE2-152 C Adder 21.4 MW 18.19 MW
941552 AE2-152 E Adder 14.26 MW 12.12 MW
957371 AF2-031 C Adder 1.89 MW 1.61 MW
957372 AF2-031 E Adder 2.84 MW 2.41 MW
958011 AF2-095 C Adder 20.47 MW 17.4 MW
958012 AF2-095 E Adder 13.65 MW 11.6 MW
965791 AG1-447 C Adder 13.1 MW 11.13 MW
274770 LINCOLN ;1U 50/50 3.15 MW 3.15 MW
276675 AE2-062 E Adder 0.28 MW 0.23 MW
276170 Z1-108 E Adder 5.4 MW 4.59 MW
920272 AA2-123 E Adder 5.33 MW 4.53 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 269.96 MW 269.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 58.1 MW 58.1 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.96 MW 5.96 MW
NY PJM->LTFIMP_NY CLTF 3.12 MW 3.12 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.24 MW 1.24 MW
WEC LTFEXP_WEC->PJM CLTF 7.27 MW 7.27 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 1.4 MW 1.4 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.69 MW 0.69 MW
TVA LTFEXP_TVA->PJM CLTF 5.86 MW 5.86 MW
MEC LTFEXP_MEC->PJM CLTF 27.55 MW 27.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 10.93 MW 10.93 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.75 MW 0.75 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 38.2 MW 38.2 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 2.12 MW 2.12 MW

Details for E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line l/o AEP_P4_#2978_05DUMONT 765_B_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
Contingency Name:
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 110.79 %
Rating: 1399.0 MVA
Rating Type: B
MVA to Mitigate: 1549.97 MVA
MW Contribution: 38.15 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.72 MW 2.31 MW
962781 AG1-127 C Adder 7.23 MW 6.15 MW
962782 AG1-127 E Adder 4.81 MW 4.09 MW
966091 AG1-478 C Adder 2.02 MW 1.72 MW
966092 AG1-478 E Adder 0.51 MW 0.43 MW
966441 AG1-513 C Adder 0.53 MW 0.45 MW
966442 AG1-513 E Adder 0.79 MW 0.67 MW
290021 O50 E Adder 20.34 MW 17.29 MW
290051 GSG-6; E Adder 10.81 MW 9.19 MW
295109 WESTBROOK E Adder 5.79 MW 4.92 MW
295111 SUBLETTE E Adder 2.81 MW 2.39 MW
918052 AA1-018 E OP Adder 15.9 MW 13.51 MW
933911 AD1-013 C Adder 1.9 MW 1.62 MW
933912 AD1-013 E Adder 3.04 MW 2.58 MW
934722 AD1-100 E Adder 92.46 MW 78.59 MW
937002 AD2-134 E Adder 10.45 MW 8.88 MW
937312 AD2-172 E Adder 3.5 MW 2.98 MW
942991 AE2-321 C Adder 8.45 MW 7.18 MW
942992 AE2-321 E Adder 4.16 MW 3.54 MW
958481 AF2-142 C Adder 10.96 MW 9.32 MW
958482 AF2-142 E Adder 7.31 MW 6.21 MW
958491 AF2-143 C Adder 10.9 MW 9.27 MW
958492 AF2-143 E Adder 7.27 MW 6.18 MW
959081 AF2-199 C Adder 7.38 MW 6.27 MW
959082 AF2-199 E Adder 3.69 MW 3.13 MW
959351 AF2-226 C 50/50 2.97 MW 2.97 MW
959352 AF2-226 E 50/50 4.45 MW 4.45 MW
960281 AF2-319 C 50/50 2.97 MW 2.97 MW
960282 AF2-319 E 50/50 4.45 MW 4.45 MW
960582 AF2-349 E Adder 37.51 MW 31.88 MW
960751 AF2-366 C Adder 7.21 MW 6.13 MW
960752 AF2-366 E Adder 4.81 MW 4.09 MW
274654 BRAIDWOOD;1U 50/50 27.82 MW 27.82 MW
274655 BRAIDWOOD;2U 50/50 27.07 MW 27.07 MW
274660 LASCO STA;1U 50/50 25.68 MW 25.68 MW
274661 LASCO STA;2U 50/50 25.76 MW 25.76 MW
274675 JOLIET 29;7U 50/50 76.73 MW 76.73 MW
274676 JOLIET 29;8U 50/50 76.78 MW 76.78 MW
274682 WAUKEGAN ;7U Adder 42.95 MW 36.51 MW
274683 WAUKEGAN ;8U Adder 46.3 MW 39.35 MW
274687 WILL CNTY;4U 50/50 72.42 MW 72.42 MW
274728 ELWOOD EC;5P 50/50 3.39 MW 3.39 MW
274732 ELWOOD EC;7P 50/50 3.39 MW 3.39 MW
274734 ELWOOD EC;8P 50/50 3.39 MW 3.39 MW
274861 TOP CROP ;1U 50/50 0.45 MW 0.45 MW
274862 TOP CROP ;2U 50/50 0.85 MW 0.85 MW
276591 L-013 2 Adder 3.8 MW 3.23 MW
293061 N-015 E Adder 16.16 MW 13.74 MW
293644 O22 E1 50/50 17.05 MW 17.05 MW
293645 O22 E2 50/50 19.53 MW 19.53 MW
294392 P-010 E Adder 20.53 MW 17.45 MW
294763 P-046 E Adder 9.73 MW 8.27 MW
940502 AE2-035 E Adder 3.5 MW 2.98 MW
957331 AF2-027 C Adder 2.6 MW 2.21 MW
957332 AF2-027 E Adder 3.89 MW 3.31 MW
957471 AF2-041 C Adder 22.13 MW 18.81 MW
957472 AF2-041 E Adder 11.07 MW 9.41 MW
274674 JOLIET 9 ;6U Adder 35.59 MW 30.25 MW
938851 AE1-113 C Adder 8.39 MW 7.13 MW
938852 AE1-113 E Adder 29.74 MW 25.28 MW
934101 AD2-000 1 Adder 5.94 MW 5.05 MW
934111 AD2-000 2 Adder 6.36 MW 5.41 MW
274704 KENDALL ;1C 50/50 4.17 MW 4.17 MW
274705 KENDALL ;1S 50/50 2.79 MW 2.79 MW
274706 KENDALL ;2C 50/50 4.17 MW 4.17 MW
274707 KENDALL ;2S 50/50 2.79 MW 2.79 MW
276640 AC1-204 GEN1 50/50 12.58 MW 12.58 MW
276642 AC1-204 GEN2 50/50 12.6 MW 12.6 MW
290108 LEEDK;1U E Adder 24.79 MW 21.07 MW
916221 Z1-073 E Adder 7.62 MW 6.47 MW
936292 AD2-038 E Adder 14.97 MW 12.72 MW
936372 AD2-047 E Adder 16.76 MW 14.25 MW
936511 AD2-066 C Adder 8.59 MW 7.3 MW
936512 AD2-066 E Adder 5.73 MW 4.87 MW
942421 AE2-255 C Adder 3.18 MW 2.7 MW
942422 AE2-255 E Adder 9.53 MW 8.1 MW
942651 AE2-281 C Adder 0.85 MW 0.72 MW
942652 AE2-281 E Adder 5.21 MW 4.43 MW
943121 AE2-341 C Adder 13.15 MW 11.18 MW
943122 AE2-341 E Adder 6.46 MW 5.49 MW
943591 AF1-030 C Adder 8.74 MW 7.43 MW
943592 AF1-030 E Adder 4.33 MW 3.68 MW
959091 AF2-200 C Adder 14.75 MW 12.54 MW
959092 AF2-200 E Adder 9.84 MW 8.36 MW
930481 AB1-089 C Adder 67.84 MW 57.67 MW
930482 AB1-089 E Adder 3.08 MW 2.62 MW
939321 AE1-163 C Adder 5.94 MW 5.04 MW
939322 AE1-163 E Adder 36.46 MW 30.99 MW
939351 AE1-166 C Adder 10.3 MW 8.76 MW
939352 AE1-166 E Adder 9.51 MW 8.08 MW
939401 AE1-172 C Adder 5.4 MW 4.59 MW
939402 AE1-172 E Adder 25.27 MW 21.48 MW
946671 AF1-331 C Adder 2.47 MW 2.1 MW
962691 AG1-118 C Adder 22.89 MW 19.46 MW
962692 AG1-118 E Adder 15.26 MW 12.97 MW
941551 AE2-152 C Adder 11.89 MW 10.11 MW
941552 AE2-152 E Adder 7.92 MW 6.74 MW
276675 AE2-062 E Adder 0.15 MW 0.13 MW
276170 Z1-108 E Adder 3.04 MW 2.58 MW
920272 AA2-123 E Adder 2.98 MW 2.53 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 82.12 MW 82.12 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 14.86 MW 14.86 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.97 MW 1.97 MW
NY PJM->LTFIMP_NY CLTF 1.06 MW 1.06 MW
WEC LTFEXP_WEC->PJM CLTF 4.05 MW 4.05 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.46 MW 0.46 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.24 MW 0.24 MW
TVA LTFEXP_TVA->PJM CLTF 1.41 MW 1.41 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.55 MW 0.55 MW
MEC LTFEXP_MEC->PJM CLTF 13.41 MW 13.41 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.58 MW 1.58 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.64 MW 3.64 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 12.66 MW 12.66 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.69 MW 0.69 MW

Details for E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT4-5___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
Contingency Name:
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 110.76 %
Rating: 1399.0 MVA
Rating Type: B
MVA to Mitigate: 1549.49 MVA
MW Contribution: 38.32 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.73 MW 2.32 MW
962781 AG1-127 C Adder 7.26 MW 6.17 MW
962782 AG1-127 E Adder 4.83 MW 4.11 MW
966091 AG1-478 C Adder 2.03 MW 1.73 MW
966092 AG1-478 E Adder 0.51 MW 0.43 MW
966441 AG1-513 C Adder 0.53 MW 0.45 MW
966442 AG1-513 E Adder 0.79 MW 0.67 MW
290021 O50 E Adder 20.41 MW 17.35 MW
290051 GSG-6; E Adder 10.85 MW 9.22 MW
295109 WESTBROOK E Adder 5.81 MW 4.94 MW
295111 SUBLETTE E Adder 2.82 MW 2.4 MW
918052 AA1-018 E OP Adder 15.96 MW 13.57 MW
933911 AD1-013 C Adder 1.91 MW 1.62 MW
933912 AD1-013 E Adder 3.05 MW 2.59 MW
934722 AD1-100 E Adder 92.79 MW 78.87 MW
937002 AD2-134 E Adder 10.49 MW 8.92 MW
937312 AD2-172 E Adder 3.51 MW 2.99 MW
942991 AE2-321 C Adder 8.49 MW 7.21 MW
942992 AE2-321 E Adder 4.18 MW 3.55 MW
958481 AF2-142 C Adder 11.01 MW 9.36 MW
958482 AF2-142 E Adder 7.34 MW 6.24 MW
958491 AF2-143 C Adder 10.94 MW 9.3 MW
958492 AF2-143 E Adder 7.3 MW 6.2 MW
959081 AF2-199 C Adder 7.41 MW 6.3 MW
959082 AF2-199 E Adder 3.7 MW 3.15 MW
959351 AF2-226 C 50/50 2.98 MW 2.98 MW
959352 AF2-226 E 50/50 4.47 MW 4.47 MW
960281 AF2-319 C 50/50 2.98 MW 2.98 MW
960282 AF2-319 E 50/50 4.47 MW 4.47 MW
960582 AF2-349 E Adder 37.66 MW 32.01 MW
960751 AF2-366 C Adder 7.24 MW 6.16 MW
960752 AF2-366 E Adder 4.83 MW 4.1 MW
274654 BRAIDWOOD;1U 50/50 27.92 MW 27.92 MW
274655 BRAIDWOOD;2U 50/50 27.17 MW 27.17 MW
274660 LASCO STA;1U 50/50 25.79 MW 25.79 MW
274661 LASCO STA;2U 50/50 25.88 MW 25.88 MW
274675 JOLIET 29;7U 50/50 77.08 MW 77.08 MW
274676 JOLIET 29;8U 50/50 77.12 MW 77.12 MW
274682 WAUKEGAN ;7U Adder 43.14 MW 36.67 MW
274683 WAUKEGAN ;8U Adder 46.5 MW 39.52 MW
274687 WILL CNTY;4U 50/50 72.74 MW 72.74 MW
274728 ELWOOD EC;5P 50/50 3.4 MW 3.4 MW
274732 ELWOOD EC;7P 50/50 3.4 MW 3.4 MW
274736 ELWOOD EC;9P 50/50 3.4 MW 3.4 MW
274861 TOP CROP ;1U 50/50 0.45 MW 0.45 MW
274862 TOP CROP ;2U 50/50 0.85 MW 0.85 MW
276591 L-013 2 Adder 3.81 MW 3.24 MW
293061 N-015 E Adder 16.23 MW 13.8 MW
293644 O22 E1 50/50 17.11 MW 17.11 MW
293645 O22 E2 50/50 19.59 MW 19.59 MW
294392 P-010 E Adder 20.62 MW 17.52 MW
294763 P-046 E Adder 9.77 MW 8.3 MW
940502 AE2-035 E Adder 3.51 MW 2.99 MW
957331 AF2-027 C Adder 2.61 MW 2.21 MW
957332 AF2-027 E Adder 3.91 MW 3.32 MW
957471 AF2-041 C Adder 22.22 MW 18.89 MW
957472 AF2-041 E Adder 11.11 MW 9.44 MW
274674 JOLIET 9 ;6U Adder 35.76 MW 30.4 MW
938851 AE1-113 C Adder 8.42 MW 7.16 MW
938852 AE1-113 E Adder 29.85 MW 25.38 MW
934101 AD2-000 1 Adder 5.97 MW 5.07 MW
934111 AD2-000 2 Adder 6.39 MW 5.43 MW
274704 KENDALL ;1C 50/50 4.19 MW 4.19 MW
274705 KENDALL ;1S 50/50 2.8 MW 2.8 MW
274706 KENDALL ;2C 50/50 4.19 MW 4.19 MW
274707 KENDALL ;2S 50/50 2.8 MW 2.8 MW
276640 AC1-204 GEN1 50/50 12.64 MW 12.64 MW
276642 AC1-204 GEN2 50/50 12.66 MW 12.66 MW
290108 LEEDK;1U E Adder 24.89 MW 21.16 MW
916221 Z1-073 E Adder 7.65 MW 6.5 MW
936292 AD2-038 E Adder 15.03 MW 12.78 MW
936372 AD2-047 E Adder 16.85 MW 14.32 MW
936511 AD2-066 C Adder 8.63 MW 7.33 MW
936512 AD2-066 E Adder 5.75 MW 4.89 MW
942421 AE2-255 C Adder 3.19 MW 2.71 MW
942422 AE2-255 E Adder 9.57 MW 8.13 MW
942651 AE2-281 C Adder 0.85 MW 0.72 MW
942652 AE2-281 E Adder 5.23 MW 4.44 MW
943121 AE2-341 C Adder 13.21 MW 11.23 MW
943122 AE2-341 E Adder 6.49 MW 5.51 MW
943591 AF1-030 C Adder 8.78 MW 7.47 MW
943592 AF1-030 E Adder 4.35 MW 3.69 MW
959091 AF2-200 C Adder 14.81 MW 12.59 MW
959092 AF2-200 E Adder 9.88 MW 8.39 MW
930481 AB1-089 C Adder 68.11 MW 57.9 MW
930482 AB1-089 E Adder 3.1 MW 2.63 MW
939321 AE1-163 C Adder 5.96 MW 5.06 MW
939322 AE1-163 E Adder 36.6 MW 31.11 MW
939351 AE1-166 C Adder 10.34 MW 8.79 MW
939352 AE1-166 E Adder 9.54 MW 8.11 MW
939401 AE1-172 C Adder 5.41 MW 4.6 MW
939402 AE1-172 E Adder 25.34 MW 21.54 MW
946671 AF1-331 C Adder 2.48 MW 2.11 MW
962691 AG1-118 C Adder 22.99 MW 19.54 MW
962692 AG1-118 E Adder 15.33 MW 13.03 MW
941551 AE2-152 C Adder 11.93 MW 10.14 MW
941552 AE2-152 E Adder 7.95 MW 6.76 MW
276675 AE2-062 E Adder 0.16 MW 0.13 MW
276170 Z1-108 E Adder 3.05 MW 2.59 MW
920272 AA2-123 E Adder 2.99 MW 2.54 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 82.96 MW 82.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 14.44 MW 14.44 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.98 MW 1.98 MW
NY PJM->LTFIMP_NY CLTF 1.06 MW 1.06 MW
WEC LTFEXP_WEC->PJM CLTF 4.07 MW 4.07 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.49 MW 0.49 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.25 MW 0.25 MW
TVA LTFEXP_TVA->PJM CLTF 1.33 MW 1.33 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.62 MW 0.62 MW
MEC LTFEXP_MEC->PJM CLTF 13.41 MW 13.41 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.8 MW 1.8 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.55 MW 3.55 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 12.69 MW 12.69 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.72 MW 0.72 MW

Details for E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT3-4___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line
270728 to 274750 ckt 1
Contingency Name:
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 110.75 %
Rating: 1399.0 MVA
Rating Type: B
MVA to Mitigate: 1549.42 MVA
MW Contribution: 38.32 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.73 MW 2.32 MW
962781 AG1-127 C Adder 7.26 MW 6.17 MW
962782 AG1-127 E Adder 4.83 MW 4.11 MW
966091 AG1-478 C Adder 2.03 MW 1.73 MW
966092 AG1-478 E Adder 0.51 MW 0.43 MW
966441 AG1-513 C Adder 0.53 MW 0.45 MW
966442 AG1-513 E Adder 0.79 MW 0.67 MW
290021 O50 E Adder 20.41 MW 17.35 MW
290051 GSG-6; E Adder 10.85 MW 9.22 MW
295109 WESTBROOK E Adder 5.81 MW 4.94 MW
295111 SUBLETTE E Adder 2.82 MW 2.4 MW
918052 AA1-018 E OP Adder 15.96 MW 13.57 MW
933911 AD1-013 C Adder 1.91 MW 1.62 MW
933912 AD1-013 E Adder 3.05 MW 2.59 MW
934722 AD1-100 E Adder 92.8 MW 78.88 MW
937002 AD2-134 E Adder 10.49 MW 8.92 MW
937312 AD2-172 E Adder 3.51 MW 2.99 MW
942991 AE2-321 C Adder 8.49 MW 7.21 MW
942992 AE2-321 E Adder 4.18 MW 3.55 MW
958481 AF2-142 C Adder 11.01 MW 9.36 MW
958482 AF2-142 E Adder 7.34 MW 6.24 MW
958491 AF2-143 C Adder 10.94 MW 9.3 MW
958492 AF2-143 E Adder 7.3 MW 6.2 MW
959081 AF2-199 C Adder 7.41 MW 6.29 MW
959082 AF2-199 E Adder 3.7 MW 3.15 MW
959351 AF2-226 C 50/50 2.98 MW 2.98 MW
959352 AF2-226 E 50/50 4.47 MW 4.47 MW
960281 AF2-319 C 50/50 2.98 MW 2.98 MW
960282 AF2-319 E 50/50 4.47 MW 4.47 MW
960582 AF2-349 E Adder 37.66 MW 32.01 MW
960751 AF2-366 C Adder 7.24 MW 6.16 MW
960752 AF2-366 E Adder 4.83 MW 4.1 MW
274654 BRAIDWOOD;1U 50/50 27.92 MW 27.92 MW
274655 BRAIDWOOD;2U 50/50 27.17 MW 27.17 MW
274660 LASCO STA;1U 50/50 25.79 MW 25.79 MW
274661 LASCO STA;2U 50/50 25.88 MW 25.88 MW
274675 JOLIET 29;7U 50/50 77.07 MW 77.07 MW
274676 JOLIET 29;8U 50/50 77.12 MW 77.12 MW
274682 WAUKEGAN ;7U Adder 43.14 MW 36.66 MW
274683 WAUKEGAN ;8U Adder 46.49 MW 39.52 MW
274687 WILL CNTY;4U 50/50 72.74 MW 72.74 MW
274728 ELWOOD EC;5P 50/50 3.4 MW 3.4 MW
274730 ELWOOD EC;6P 50/50 3.4 MW 3.4 MW
274732 ELWOOD EC;7P 50/50 3.4 MW 3.4 MW
274861 TOP CROP ;1U 50/50 0.45 MW 0.45 MW
274862 TOP CROP ;2U 50/50 0.85 MW 0.85 MW
276591 L-013 2 Adder 3.81 MW 3.24 MW
293061 N-015 E Adder 16.23 MW 13.8 MW
293644 O22 E1 50/50 17.11 MW 17.11 MW
293645 O22 E2 50/50 19.59 MW 19.59 MW
294392 P-010 E Adder 20.62 MW 17.52 MW
294763 P-046 E Adder 9.77 MW 8.3 MW
940502 AE2-035 E Adder 3.51 MW 2.99 MW
957331 AF2-027 C Adder 2.61 MW 2.21 MW
957332 AF2-027 E Adder 3.91 MW 3.32 MW
957471 AF2-041 C Adder 22.22 MW 18.89 MW
957472 AF2-041 E Adder 11.11 MW 9.44 MW
274674 JOLIET 9 ;6U Adder 35.76 MW 30.4 MW
938851 AE1-113 C Adder 8.42 MW 7.16 MW
938852 AE1-113 E Adder 29.85 MW 25.37 MW
934101 AD2-000 1 Adder 5.97 MW 5.07 MW
934111 AD2-000 2 Adder 6.38 MW 5.43 MW
274704 KENDALL ;1C 50/50 4.19 MW 4.19 MW
274705 KENDALL ;1S 50/50 2.8 MW 2.8 MW
274706 KENDALL ;2C 50/50 4.19 MW 4.19 MW
274707 KENDALL ;2S 50/50 2.8 MW 2.8 MW
276640 AC1-204 GEN1 50/50 12.64 MW 12.64 MW
276642 AC1-204 GEN2 50/50 12.66 MW 12.66 MW
290108 LEEDK;1U E Adder 24.89 MW 21.16 MW
916221 Z1-073 E Adder 7.65 MW 6.5 MW
936292 AD2-038 E Adder 15.03 MW 12.77 MW
936372 AD2-047 E Adder 16.85 MW 14.32 MW
936511 AD2-066 C Adder 8.63 MW 7.33 MW
936512 AD2-066 E Adder 5.75 MW 4.89 MW
942421 AE2-255 C Adder 3.19 MW 2.71 MW
942422 AE2-255 E Adder 9.57 MW 8.13 MW
942651 AE2-281 C Adder 0.85 MW 0.72 MW
942652 AE2-281 E Adder 5.23 MW 4.44 MW
943121 AE2-341 C Adder 13.21 MW 11.23 MW
943122 AE2-341 E Adder 6.49 MW 5.51 MW
943591 AF1-030 C Adder 8.78 MW 7.47 MW
943592 AF1-030 E Adder 4.35 MW 3.69 MW
959091 AF2-200 C Adder 14.81 MW 12.59 MW
959092 AF2-200 E Adder 9.87 MW 8.39 MW
930481 AB1-089 C Adder 68.11 MW 57.89 MW
930482 AB1-089 E Adder 3.1 MW 2.63 MW
939321 AE1-163 C Adder 5.96 MW 5.06 MW
939322 AE1-163 E Adder 36.6 MW 31.11 MW
939351 AE1-166 C Adder 10.34 MW 8.79 MW
939352 AE1-166 E Adder 9.54 MW 8.11 MW
939401 AE1-172 C Adder 5.41 MW 4.6 MW
939402 AE1-172 E Adder 25.34 MW 21.54 MW
946671 AF1-331 C Adder 2.48 MW 2.11 MW
962691 AG1-118 C Adder 22.99 MW 19.54 MW
962692 AG1-118 E Adder 15.33 MW 13.03 MW
941551 AE2-152 C Adder 11.93 MW 10.14 MW
941552 AE2-152 E Adder 7.95 MW 6.76 MW
276675 AE2-062 E Adder 0.16 MW 0.13 MW
276170 Z1-108 E Adder 3.05 MW 2.59 MW
920272 AA2-123 E Adder 2.99 MW 2.54 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 82.95 MW 82.95 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 14.44 MW 14.44 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.98 MW 1.98 MW
NY PJM->LTFIMP_NY CLTF 1.06 MW 1.06 MW
WEC LTFEXP_WEC->PJM CLTF 4.07 MW 4.07 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.49 MW 0.49 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.25 MW 0.25 MW
TVA LTFEXP_TVA->PJM CLTF 1.33 MW 1.33 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.62 MW 0.62 MW
MEC LTFEXP_MEC->PJM CLTF 13.41 MW 13.41 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.8 MW 1.8 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.55 MW 3.55 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 12.69 MW 12.69 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.72 MW 0.72 MW

Details for 05DUMONT-05SORENS 765.0 kV Ckt 1 line l/o AEP_P4_#6189_05HANG R 765_D1_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP
Facility Description:
05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
Contingency Name:
AEP_P4_#6189_05HANG R 765_D1_SRT-A
CONTINGENCY 'AEP_P4_#6189_05HANG R 765_D1_SRT-A'
 OPEN BRANCH FROM BUS 242921 TO BUS 242924 CKT 1   /*05CORNU      765.0 - 05HANG R     765.0
 OPEN BRANCH FROM BUS 242921 TO BUS 242934 CKT 1   /*05CORNU      765.0 - 05CORNU      345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
 REMOVE UNIT 1A FROM BUS 247245                    /*05HRKG1A      18.0
 REMOVE UNIT 1B FROM BUS 247246                    /*05HRKG1B      18.0
 REMOVE UNIT 1S FROM BUS 247247                    /*05HRKG1S      18.0
 REMOVE UNIT 2 FROM BUS 247249                     /*05HRKG2B      18.0
 REMOVE UNIT 2A FROM BUS 247248                    /*05HRKG2A      18.0
 REMOVE UNIT 2S FROM BUS 247250                    /*05HRKG2S      18.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.0 %
Rating: 4142.0 MVA
Rating Type: B
MVA to Mitigate: 4183.58 MVA
MW Contribution: 62.4 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 4.48 MW 3.81 MW
962781 AG1-127 C Adder 11.84 MW 10.06 MW
962782 AG1-127 E Adder 7.88 MW 6.7 MW
965681 AG1-436 C Adder 16.12 MW 13.71 MW
965682 AG1-436 E Adder 10.75 MW 9.14 MW
966091 AG1-478 C Adder 3.38 MW 2.87 MW
966092 AG1-478 E Adder 0.85 MW 0.72 MW
966431 AG1-512 C Adder 3.44 MW 2.92 MW
966432 AG1-512 E Adder 5.16 MW 4.38 MW
966441 AG1-513 C Adder 0.85 MW 0.72 MW
966442 AG1-513 E Adder 1.28 MW 1.08 MW
290021 O50 E Adder 32.48 MW 27.61 MW
290051 GSG-6; E Adder 17.83 MW 15.16 MW
295109 WESTBROOK E Adder 9.55 MW 8.12 MW
295111 SUBLETTE E Adder 4.64 MW 3.94 MW
910542 X3-005 E Adder 1.2 MW 1.02 MW
918052 AA1-018 E OP Adder 26.94 MW 22.9 MW
933911 AD1-013 C Adder 3.14 MW 2.67 MW
933912 AD1-013 E Adder 5.01 MW 4.26 MW
934722 AD1-100 E Adder 151.01 MW 128.36 MW
937002 AD2-134 E Adder 17.24 MW 14.66 MW
942991 AE2-321 C Adder 13.75 MW 11.69 MW
942992 AE2-321 E Adder 6.77 MW 5.76 MW
958481 AF2-142 C Adder 18.58 MW 15.79 MW
958482 AF2-142 E Adder 12.38 MW 10.53 MW
958491 AF2-143 C Adder 18.31 MW 15.56 MW
958492 AF2-143 E Adder 12.2 MW 10.37 MW
959351 AF2-226 C Adder 4.13 MW 3.51 MW
959352 AF2-226 E Adder 6.19 MW 5.26 MW
960281 AF2-319 C Adder 4.13 MW 3.51 MW
960282 AF2-319 E Adder 6.19 MW 5.26 MW
960582 AF2-349 E Adder 61.2 MW 52.02 MW
960681 AF2-359 C Adder 16.12 MW 13.71 MW
960682 AF2-359 E Adder 10.75 MW 9.14 MW
960751 AF2-366 C Adder 11.81 MW 10.04 MW
960752 AF2-366 E Adder 7.87 MW 6.69 MW
243441 05CKG2 50/50 55.5 MW 55.5 MW
274660 LASCO STA;1U 50/50 40.05 MW 40.05 MW
274661 LASCO STA;2U 50/50 40.18 MW 40.18 MW
274675 JOLIET 29;7U Adder 117.59 MW 99.95 MW
274676 JOLIET 29;8U Adder 117.59 MW 99.95 MW
274682 WAUKEGAN ;7U Adder 68.53 MW 58.25 MW
274683 WAUKEGAN ;8U Adder 73.93 MW 62.84 MW
274687 WILL CNTY;4U Adder 108.94 MW 92.6 MW
274771 LINCOLN ;2U 50/50 2.87 MW 2.87 MW
274772 LINCOLN ;3U 50/50 2.87 MW 2.87 MW
274773 LINCOLN ;4U 50/50 2.87 MW 2.87 MW
274774 LINCOLN ;5U 50/50 2.87 MW 2.87 MW
274775 LINCOLN ;6U 50/50 2.87 MW 2.87 MW
274776 LINCOLN ;7U 50/50 2.87 MW 2.87 MW
274777 LINCOLN ;8U 50/50 2.87 MW 2.87 MW
274788 SE CHICAG;5U Adder 7.92 MW 6.74 MW
274789 SE CHICAG;6U Adder 7.92 MW 6.74 MW
274790 SE CHICAG;7U Adder 7.92 MW 6.74 MW
274791 SE CHICAG;8U Adder 7.92 MW 6.74 MW
274792 SE CHICAG;9U Adder 7.91 MW 6.73 MW
274793 SE CHICAG;0U Adder 7.91 MW 6.73 MW
274794 SE CHICAG;1U Adder 7.91 MW 6.73 MW
274795 SE CHICAG;2U Adder 7.91 MW 6.73 MW
276591 L-013 2 Adder 6.13 MW 5.21 MW
293061 N-015 E Adder 25.67 MW 21.82 MW
293644 O22 E1 Adder 23.72 MW 20.17 MW
293645 O22 E2 Adder 27.17 MW 23.1 MW
294392 P-010 E Adder 32.6 MW 27.71 MW
933411 AC2-154 C Adder 4.08 MW 3.47 MW
933412 AC2-154 E Adder 6.66 MW 5.66 MW
957331 AF2-027 C Adder 4.15 MW 3.53 MW
957332 AF2-027 E Adder 6.23 MW 5.3 MW
274674 JOLIET 9 ;6U Adder 59.98 MW 50.99 MW
938851 AE1-113 C Adder 13.4 MW 11.39 MW
938852 AE1-113 E Adder 47.5 MW 40.38 MW
934101 AD2-000 1 Adder 9.8 MW 8.33 MW
934111 AD2-000 2 Adder 9.83 MW 8.36 MW
270100 AB1-080 CT1 50/50 8.15 MW 8.15 MW
270101 AB1-080 CT2 50/50 8.15 MW 8.15 MW
270102 AB1-080 ST 50/50 8.82 MW 8.82 MW
274708 KENDALL ;3C 50/50 6.53 MW 6.53 MW
274709 KENDALL ;3S 50/50 4.32 MW 4.32 MW
274710 KENDALL ;4C 50/50 6.45 MW 6.45 MW
274711 KENDALL ;4S 50/50 4.32 MW 4.32 MW
275149 KELLYCK ;1E Adder 30.09 MW 25.58 MW
293519 PILOT HIL;1E Adder 30.09 MW 25.58 MW
290108 LEEDK;1U E Adder 40.71 MW 34.6 MW
916221 Z1-073 E Adder 12.57 MW 10.68 MW
936292 AD2-038 E Adder 25.14 MW 21.37 MW
936371 AD2-047 C Adder 7.31 MW 6.21 MW
936372 AD2-047 E Adder 35.68 MW 30.33 MW
936461 AD2-060 C Adder 4.3 MW 3.65 MW
936511 AD2-066 C Adder 14.21 MW 12.08 MW
936512 AD2-066 E Adder 9.47 MW 8.05 MW
942421 AE2-255 C Adder 5.08 MW 4.31 MW
942422 AE2-255 E Adder 15.23 MW 12.94 MW
942651 AE2-281 C Adder 1.42 MW 1.21 MW
942652 AE2-281 E Adder 8.75 MW 7.43 MW
943121 AE2-341 C Adder 21.5 MW 18.28 MW
943122 AE2-341 E Adder 10.56 MW 8.97 MW
943591 AF1-030 C Adder 14.3 MW 12.15 MW
943592 AF1-030 E Adder 7.08 MW 6.01 MW
960591 AF2-350 C Adder 12.9 MW 10.96 MW
960592 AF2-350 E Adder 8.6 MW 7.31 MW
961501 AF2-441 C Adder 17.19 MW 14.61 MW
961502 AF2-441 E Adder 25.78 MW 21.91 MW
930481 AB1-089 C Adder 77.11 MW 65.54 MW
939321 AE1-163 C Adder 9.97 MW 8.47 MW
939322 AE1-163 E Adder 61.23 MW 52.04 MW
939351 AE1-166 C Adder 16.83 MW 14.3 MW
939352 AE1-166 E Adder 15.53 MW 13.2 MW
939401 AE1-172 C Adder 9.24 MW 7.86 MW
939402 AE1-172 E Adder 43.26 MW 36.77 MW
946671 AF1-331 C Adder 4.08 MW 3.46 MW
962691 AG1-118 C Adder 37.44 MW 31.82 MW
962692 AG1-118 E Adder 24.96 MW 21.21 MW
941551 AE2-152 C Adder 19.42 MW 16.5 MW
941552 AE2-152 E Adder 12.94 MW 11.0 MW
957371 AF2-031 C Adder 1.71 MW 1.46 MW
957372 AF2-031 E Adder 2.57 MW 2.19 MW
958011 AF2-095 C Adder 18.57 MW 15.79 MW
958012 AF2-095 E Adder 12.38 MW 10.52 MW
965791 AG1-447 C Adder 11.82 MW 10.05 MW
274770 LINCOLN ;1U 50/50 2.87 MW 2.87 MW
276675 AE2-062 E Adder 0.25 MW 0.21 MW
276170 Z1-108 E Adder 4.9 MW 4.17 MW
920272 AA2-123 E Adder 4.84 MW 4.11 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 244.38 MW 244.38 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 53.86 MW 53.86 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.55 MW 5.55 MW
NY PJM->LTFIMP_NY CLTF 2.92 MW 2.92 MW
LGEE LTFEXP_LGEE->PJM CLTF 3.06 MW 3.06 MW
WEC LTFEXP_WEC->PJM CLTF 6.6 MW 6.6 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 1.14 MW 1.14 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.54 MW 0.54 MW
TVA LTFEXP_TVA->PJM CLTF 5.99 MW 5.99 MW
MEC LTFEXP_MEC->PJM CLTF 25.0 MW 25.0 MW
LAGN LTFEXP_LAGN->PJM CLTF 10.48 MW 10.48 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.78 MW 0.78 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 35.62 MW 35.62 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.78 MW 1.78 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o COMED_P2-2_116_GG-345R__2_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
Contingency Name:
COMED_P2-2_116_GG-345R__2_SRT-A
CONTINGENCY 'COMED_P2-2_116_GG-345R__2_SRT-A'
 DISCONNECT BUS 270769   /*GOODINGS ;2R 345.0
END
Contingency Type: Bus
DC|AC: AC
Final Cycle Loading: 103.69 %
Rating: 2297.0 MVA
Rating Type: STE
MVA to Mitigate: 2381.82 MVA
MW Contribution: 22.67 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.69 MW 1.44 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C Adder 4.31 MW 3.67 MW
962782 AG1-127 E Adder 2.87 MW 2.44 MW
966091 AG1-478 C Adder 1.08 MW 0.92 MW
966092 AG1-478 E Adder 0.27 MW 0.23 MW
966441 AG1-513 C Adder 0.31 MW 0.26 MW
966442 AG1-513 E Adder 0.46 MW 0.39 MW
290021 O50 E Adder 24.7 MW 21.0 MW
290051 GSG-6; E Adder 6.74 MW 5.73 MW
295109 WESTBROOK E Adder 3.61 MW 3.07 MW
295111 SUBLETTE E Adder 1.75 MW 1.49 MW
918052 AA1-018 E OP Adder 18.79 MW 15.97 MW
933911 AD1-013 C Adder 1.18 MW 1.01 MW
933912 AD1-013 E Adder 1.89 MW 1.61 MW
937002 AD2-134 E Adder 6.52 MW 5.54 MW
937312 AD2-172 E Adder 2.34 MW 1.99 MW
937401 AD2-194 1 50/50 1.95 MW 1.95 MW
937411 AD2-194 2 50/50 1.96 MW 1.96 MW
942991 AE2-321 C Adder 5.49 MW 4.66 MW
942992 AE2-321 E Adder 2.7 MW 2.3 MW
958481 AF2-142 C Adder 12.96 MW 11.02 MW
958482 AF2-142 E Adder 8.64 MW 7.34 MW
958491 AF2-143 C Adder 13.1 MW 11.13 MW
958492 AF2-143 E Adder 8.73 MW 7.42 MW
958912 AF2-182 E Adder 24.27 MW 20.63 MW
959081 AF2-199 C Adder 4.97 MW 4.22 MW
959082 AF2-199 E Adder 2.48 MW 2.11 MW
959351 AF2-226 C 50/50 5.97 MW 5.97 MW
959352 AF2-226 E 50/50 8.95 MW 8.95 MW
960281 AF2-319 C 50/50 5.97 MW 5.97 MW
960282 AF2-319 E 50/50 8.95 MW 8.95 MW
960582 AF2-349 E Adder 24.52 MW 20.84 MW
960751 AF2-366 C Adder 4.3 MW 3.65 MW
960752 AF2-366 E Adder 2.87 MW 2.44 MW
274675 JOLIET 29;7U Adder 63.96 MW 54.37 MW
274676 JOLIET 29;8U Adder 64.41 MW 54.74 MW
274682 WAUKEGAN ;7U Adder 28.23 MW 24.0 MW
274683 WAUKEGAN ;8U Adder 30.39 MW 25.83 MW
274728 ELWOOD EC;5P 50/50 5.04 MW 5.04 MW
274729 ELWOOD EC;1P 50/50 5.01 MW 5.01 MW
274730 ELWOOD EC;6P 50/50 5.04 MW 5.04 MW
274731 ELWOOD EC;2P 50/50 5.01 MW 5.01 MW
274732 ELWOOD EC;7P 50/50 5.04 MW 5.04 MW
274734 ELWOOD EC;8P 50/50 5.04 MW 5.04 MW
274735 ELWOOD EC;4P 50/50 5.01 MW 5.01 MW
274736 ELWOOD EC;9P 50/50 5.04 MW 5.04 MW
274859 EASYR;U1 E Adder 8.48 MW 7.21 MW
274860 EASYR;U2 E Adder 8.48 MW 7.21 MW
274861 TOP CROP ;1U 50/50 0.9 MW 0.9 MW
274862 TOP CROP ;2U 50/50 1.71 MW 1.71 MW
276591 L-013 2 Adder 2.32 MW 1.97 MW
293644 O22 E1 50/50 34.29 MW 34.29 MW
293645 O22 E2 50/50 39.28 MW 39.28 MW
293715 O-029 E Adder 7.19 MW 6.11 MW
293716 O-029 E Adder 3.94 MW 3.35 MW
293717 O-029 E Adder 3.62 MW 3.08 MW
293771 O-035 E Adder 5.26 MW 4.47 MW
294401 BSHIL;1U E Adder 6.85 MW 5.82 MW
294410 BSHIL;2U E Adder 6.85 MW 5.82 MW
294763 P-046 E Adder 6.51 MW 5.53 MW
925582 AC1-033 E Adder 7.5 MW 6.38 MW
939061 AE1-134 2 Adder 0.99 MW 0.84 MW
940502 AE2-035 E Adder 2.34 MW 1.99 MW
957331 AF2-027 C Adder 1.7 MW 1.45 MW
957332 AF2-027 E Adder 2.55 MW 2.17 MW
957471 AF2-041 C Adder 14.9 MW 12.66 MW
957472 AF2-041 E Adder 7.45 MW 6.33 MW
938851 AE1-113 C Adder 10.19 MW 8.66 MW
938852 AE1-113 E Adder 36.13 MW 30.71 MW
934101 AD2-000 1 Adder 5.39 MW 4.58 MW
934111 AD2-000 2 Adder 7.52 MW 6.39 MW
276640 AC1-204 GEN1 50/50 18.63 MW 18.63 MW
276642 AC1-204 GEN2 50/50 18.74 MW 18.74 MW
293516 O-009 E Adder 13.91 MW 11.82 MW
916212 CRESCENT ;1U Adder 3.69 MW 3.14 MW
927208 AC1-214 E1 Adder 2.49 MW 2.12 MW
927209 AC1-214 E2 Adder 2.49 MW 2.12 MW
957751 AF2-069 C Adder 0.16 MW 0.14 MW
957752 AF2-069 E Adder 0.53 MW 0.45 MW
990901 L-005 E Adder 10.52 MW 8.95 MW
290108 LEEDK;1U E Adder 14.95 MW 12.71 MW
916221 Z1-073 E Adder 4.75 MW 4.04 MW
926821 AC1-168 C Adder 0.72 MW 0.61 MW
926822 AC1-168 E Adder 4.81 MW 4.09 MW
934051 AD1-031 C Adder 2.29 MW 1.95 MW
934052 AD1-031 E Adder 3.74 MW 3.17 MW
936292 AD2-038 E Adder 17.98 MW 15.29 MW
936511 AD2-066 C Adder 6.54 MW 5.56 MW
936512 AD2-066 E Adder 4.36 MW 3.7 MW
942421 AE2-255 C Adder 3.86 MW 3.28 MW
942422 AE2-255 E Adder 11.58 MW 9.84 MW
942651 AE2-281 C Adder 1.02 MW 0.87 MW
942652 AE2-281 E Adder 6.26 MW 5.32 MW
943121 AE2-341 C Adder 6.53 MW 5.55 MW
943122 AE2-341 E Adder 3.21 MW 2.73 MW
943591 AF1-030 C Adder 4.34 MW 3.69 MW
943592 AF1-030 E Adder 2.15 MW 1.83 MW
959091 AF2-200 C Adder 9.93 MW 8.44 MW
959092 AF2-200 E Adder 6.62 MW 5.63 MW
961011 AF2-392 C Adder 2.84 MW 2.41 MW
961012 AF2-392 E Adder 13.22 MW 11.23 MW
966822 AG1-553 E Adder 20.66 MW 17.56 MW
930481 AB1-089 C Adder 44.7 MW 37.99 MW
930482 AB1-089 E Adder 2.03 MW 1.73 MW
938861 AE1-114 C Adder 2.74 MW 2.33 MW
938862 AE1-114 E Adder 9.35 MW 7.95 MW
939321 AE1-163 C Adder 7.13 MW 6.06 MW
939322 AE1-163 E Adder 43.8 MW 37.23 MW
946152 AF1-280 E Adder 16.18 MW 13.75 MW
946321 AF1-296 C Adder 2.66 MW 2.27 MW
946322 AF1-296 E Adder 12.48 MW 10.61 MW
946671 AF1-331 C Adder 1.54 MW 1.31 MW
962691 AG1-118 C Adder 13.6 MW 11.56 MW
962692 AG1-118 E Adder 9.07 MW 7.71 MW
965931 AG1-462 C Adder 12.16 MW 10.33 MW
965932 AG1-462 E Adder 8.11 MW 6.89 MW
276170 Z1-108 E Adder 1.95 MW 1.66 MW
920272 AA2-123 E Adder 1.93 MW 1.64 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
954983 J974 C External Queue 3.28 MW 3.28 MW
954984 J974 E External Queue 17.76 MW 17.76 MW
990547 J1333 G External Queue -21.52 MW -21.52 MW
990552 J1334 G External Queue -21.52 MW -21.52 MW
990557 J1335 G External Queue -21.52 MW -21.52 MW
990562 J1336 G External Queue -21.52 MW -21.52 MW
990577 J1339 External Queue -25.87 MW -25.87 MW
990582 J1340 External Queue -25.87 MW -25.87 MW
990647 J1355 External Queue -9.06 MW -9.06 MW
990662 J1358 External Queue -10.73 MW -10.73 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 57.54 MW 57.54 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 10.9 MW 10.9 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.16 MW 1.16 MW
NY PJM->LTFIMP_NY CLTF 0.62 MW 0.62 MW
WEC LTFEXP_WEC->PJM CLTF 2.7 MW 2.7 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.22 MW 0.22 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.11 MW 0.11 MW
TVA LTFEXP_TVA->PJM CLTF 1.16 MW 1.16 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.36 MW 0.36 MW
MEC LTFEXP_MEC->PJM CLTF 10.01 MW 10.01 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.04 MW 1.04 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.82 MW 2.82 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 7.42 MW 7.42 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.35 MW 0.35 MW

Details for 05DUMONT-05SORENS 765.0 kV Ckt 1 line l/o AEP_P7-1_#11046___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP
Facility Description:
05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
Contingency Name:
AEP_P7-1_#11046___SRT-A
CONTINGENCY 'AEP_P7-1_#11046___SRT-A'
 OPEN BRANCH FROM BUS 243219 TO BUS 246955 CKT 1   /*05DUMONT     345.0 - 05OLIVE_BP   345.0
 OPEN BRANCH FROM BUS 243228 TO BUS 243234 CKT 1   /*05MERIDN     345.0 - 05TWIN B     345.0
 OPEN BRANCH FROM BUS 243232 TO BUS 246955 CKT 1   /*05SORENS     345.0 - 05OLIVE_BP   345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 100.58 %
Rating: 4142.0 MVA
Rating Type: B
MVA to Mitigate: 4166.19 MVA
MW Contribution: 61.56 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 4.41 MW 3.75 MW
962781 AG1-127 C Adder 11.68 MW 9.93 MW
962782 AG1-127 E Adder 7.77 MW 6.61 MW
965681 AG1-436 C 50/50 16.69 MW 16.69 MW
965682 AG1-436 E 50/50 11.13 MW 11.13 MW
966091 AG1-478 C Adder 3.35 MW 2.85 MW
966092 AG1-478 E Adder 0.84 MW 0.72 MW
966431 AG1-512 C Adder 3.44 MW 2.92 MW
966432 AG1-512 E Adder 5.16 MW 4.38 MW
966441 AG1-513 C Adder 0.84 MW 0.72 MW
966442 AG1-513 E Adder 1.26 MW 1.07 MW
247967 05OLIV SLR E Adder 0.53 MW 0.45 MW
290021 O50 E Adder 31.96 MW 27.16 MW
290051 GSG-6; E Adder 17.55 MW 14.92 MW
295109 WESTBROOK E Adder 9.4 MW 7.99 MW
295111 SUBLETTE E Adder 4.57 MW 3.88 MW
910542 X3-005 E Adder 1.2 MW 1.02 MW
918052 AA1-018 E OP Adder 26.6 MW 22.61 MW
933911 AD1-013 C Adder 3.09 MW 2.63 MW
933912 AD1-013 E Adder 4.93 MW 4.19 MW
934722 AD1-100 E Adder 149.51 MW 127.08 MW
937002 AD2-134 E Adder 16.97 MW 14.43 MW
942991 AE2-321 C Adder 13.56 MW 11.52 MW
942992 AE2-321 E Adder 6.68 MW 5.67 MW
958481 AF2-142 C Adder 18.35 MW 15.59 MW
958482 AF2-142 E Adder 12.23 MW 10.4 MW
958491 AF2-143 C Adder 18.03 MW 15.33 MW
958492 AF2-143 E Adder 12.02 MW 10.22 MW
959351 AF2-226 C Adder 4.08 MW 3.47 MW
959352 AF2-226 E Adder 6.12 MW 5.2 MW
960281 AF2-319 C Adder 4.08 MW 3.47 MW
960282 AF2-319 E Adder 6.12 MW 5.2 MW
960582 AF2-349 E Adder 60.29 MW 51.24 MW
960681 AF2-359 C 50/50 16.69 MW 16.69 MW
960682 AF2-359 E 50/50 11.13 MW 11.13 MW
960751 AF2-366 C Adder 11.64 MW 9.9 MW
960752 AF2-366 E Adder 7.76 MW 6.6 MW
243440 05CKG1 50/50 36.33 MW 36.33 MW
243441 05CKG2 50/50 55.71 MW 55.71 MW
274660 LASCO STA;1U 50/50 39.69 MW 39.69 MW
274661 LASCO STA;2U 50/50 39.82 MW 39.82 MW
274675 JOLIET 29;7U Adder 116.64 MW 99.14 MW
274676 JOLIET 29;8U Adder 116.63 MW 99.14 MW
274682 WAUKEGAN ;7U Adder 67.72 MW 57.56 MW
274683 WAUKEGAN ;8U Adder 73.05 MW 62.09 MW
274687 WILL CNTY;4U Adder 108.13 MW 91.91 MW
274771 LINCOLN ;2U 50/50 2.85 MW 2.85 MW
274772 LINCOLN ;3U 50/50 2.85 MW 2.85 MW
274773 LINCOLN ;4U 50/50 2.85 MW 2.85 MW
274774 LINCOLN ;5U 50/50 2.85 MW 2.85 MW
274775 LINCOLN ;6U 50/50 2.85 MW 2.85 MW
274776 LINCOLN ;7U 50/50 2.85 MW 2.85 MW
274777 LINCOLN ;8U 50/50 2.85 MW 2.85 MW
274788 SE CHICAG;5U Adder 7.94 MW 6.75 MW
274789 SE CHICAG;6U Adder 7.94 MW 6.75 MW
274790 SE CHICAG;7U Adder 7.94 MW 6.75 MW
274791 SE CHICAG;8U Adder 7.94 MW 6.75 MW
274792 SE CHICAG;9U Adder 7.93 MW 6.74 MW
274793 SE CHICAG;0U Adder 7.93 MW 6.74 MW
274794 SE CHICAG;1U Adder 7.93 MW 6.74 MW
274795 SE CHICAG;2U Adder 7.93 MW 6.74 MW
276591 L-013 2 Adder 6.06 MW 5.15 MW
293061 N-015 E Adder 25.38 MW 21.57 MW
293644 O22 E1 Adder 23.43 MW 19.92 MW
293645 O22 E2 Adder 26.84 MW 22.81 MW
294392 P-010 E Adder 32.23 MW 27.4 MW
933411 AC2-154 C Adder 4.06 MW 3.45 MW
933412 AC2-154 E Adder 6.62 MW 5.63 MW
957331 AF2-027 C Adder 4.1 MW 3.49 MW
957332 AF2-027 E Adder 6.16 MW 5.23 MW
274674 JOLIET 9 ;6U Adder 59.46 MW 50.54 MW
938851 AE1-113 C Adder 13.18 MW 11.21 MW
938852 AE1-113 E Adder 46.74 MW 39.73 MW
934101 AD2-000 1 Adder 9.67 MW 8.22 MW
934111 AD2-000 2 Adder 9.73 MW 8.27 MW
270100 AB1-080 CT1 50/50 8.49 MW 8.49 MW
270101 AB1-080 CT2 50/50 8.49 MW 8.49 MW
270102 AB1-080 ST 50/50 9.18 MW 9.18 MW
275149 KELLYCK ;1E Adder 29.89 MW 25.41 MW
293519 PILOT HIL;1E Adder 29.89 MW 25.41 MW
290108 LEEDK;1U E Adder 40.12 MW 34.1 MW
916221 Z1-073 E Adder 12.37 MW 10.51 MW
936292 AD2-038 E Adder 24.77 MW 21.05 MW
936371 AD2-047 C Adder 7.26 MW 6.17 MW
936372 AD2-047 E Adder 35.44 MW 30.13 MW
936461 AD2-060 C Adder 4.27 MW 3.63 MW
936511 AD2-066 C Adder 13.98 MW 11.88 MW
936512 AD2-066 E Adder 9.32 MW 7.92 MW
942421 AE2-255 C Adder 4.99 MW 4.24 MW
942422 AE2-255 E Adder 14.98 MW 12.73 MW
942651 AE2-281 C Adder 1.4 MW 1.19 MW
942652 AE2-281 E Adder 8.62 MW 7.32 MW
943121 AE2-341 C Adder 21.26 MW 18.07 MW
943122 AE2-341 E Adder 10.44 MW 8.88 MW
943591 AF1-030 C Adder 14.14 MW 12.02 MW
943592 AF1-030 E Adder 7.0 MW 5.95 MW
944932 AF1-158 E Adder 12.53 MW 10.65 MW
960591 AF2-350 C Adder 12.81 MW 10.89 MW
960592 AF2-350 E Adder 8.54 MW 7.26 MW
961501 AF2-441 C Adder 17.18 MW 14.61 MW
961502 AF2-441 E Adder 25.78 MW 21.91 MW
930481 AB1-089 C Adder 48.46 MW 41.19 MW
939321 AE1-163 C Adder 9.82 MW 8.35 MW
939322 AE1-163 E Adder 60.31 MW 51.27 MW
939351 AE1-166 C Adder 16.66 MW 14.16 MW
939352 AE1-166 E Adder 15.38 MW 13.07 MW
939401 AE1-172 C Adder 9.07 MW 7.71 MW
939402 AE1-172 E Adder 42.46 MW 36.09 MW
946671 AF1-331 C Adder 4.01 MW 3.41 MW
962691 AG1-118 C Adder 36.94 MW 31.39 MW
962692 AG1-118 E Adder 24.62 MW 20.93 MW
941551 AE2-152 C Adder 19.22 MW 16.34 MW
941552 AE2-152 E Adder 12.82 MW 10.89 MW
957371 AF2-031 C Adder 1.72 MW 1.46 MW
957372 AF2-031 E Adder 2.58 MW 2.19 MW
958011 AF2-095 C Adder 18.45 MW 15.68 MW
958012 AF2-095 E Adder 12.3 MW 10.45 MW
965791 AG1-447 C 50/50 12.24 MW 12.24 MW
274770 LINCOLN ;1U 50/50 2.85 MW 2.85 MW
276675 AE2-062 E Adder 0.25 MW 0.21 MW
276170 Z1-108 E Adder 4.84 MW 4.11 MW
920272 AA2-123 E Adder 4.77 MW 4.05 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 235.99 MW 235.99 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 46.63 MW 46.63 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.22 MW 5.22 MW
NY PJM->LTFIMP_NY CLTF 2.76 MW 2.76 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.66 MW 1.66 MW
WEC LTFEXP_WEC->PJM CLTF 6.5 MW 6.5 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.92 MW 0.92 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.41 MW 0.41 MW
TVA LTFEXP_TVA->PJM CLTF 5.17 MW 5.17 MW
MEC LTFEXP_MEC->PJM CLTF 23.97 MW 23.97 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.44 MW 9.44 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.56 MW 0.56 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 33.48 MW 33.48 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.47 MW 1.47 MW

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
OP AC 138.08 % 1479.0 B 2042.19 20.56
CE WATERMAN ; B-SANDWICH ; R 138.0 kV Ckt 1 line
272728 to 272445 ckt 1
COMED_P1-2_138-L11106_B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_138-L11106_B-R_SRT-A-2'
 CLOSE LINE FROM BUS 272114 TO BUS 272115 CKT Z1       /*N AURORA ; B 138.0 - N AURORA ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 271586 TO BUS 271587   /*ESS W541 ; B 138.0 - ESS W541 ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 272522 TO BUS 272523   /*SUGAR GRV; B 138.0 - SUGAR GRV; R 138.0
 TRIP BRANCH FROM BUS 271390 TO BUS 271586 CKT 1       /*ELECT JCT; B 138.0 - ESS W541 ; B 138.0
 TRIP BRANCH FROM BUS 271586 TO BUS 272114 CKT 1       /*ESS W541 ; B 138.0 - N AURORA ; B 138.0
 TRIP BRANCH FROM BUS 272114 TO BUS 272522 CKT 1       /*N AURORA ; B 138.0 - SUGAR GRV; B 138.0
 TRIP BRANCH FROM BUS 962690 TO BUS 272522 CKT 1       /*AG1-118 TP   138.0 - SUGAR GRV; B 138.0
END
OP AC 132.09 % 309.0 B 408.17 121.26
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
OP AC 127.92 % 1479.0 B 1891.97 20.56
CE GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
Base Case OP AC 123.41 % 1201.0 A 1482.14 16.95
CE AE2-341 TP-W PLANO ; R 138.0 kV Ckt 1 line
943120 to 272803 ckt 1
COMED_P1-2_138-L11106_B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_138-L11106_B-R_SRT-A-2'
 CLOSE LINE FROM BUS 272114 TO BUS 272115 CKT Z1       /*N AURORA ; B 138.0 - N AURORA ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 271586 TO BUS 271587   /*ESS W541 ; B 138.0 - ESS W541 ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 272522 TO BUS 272523   /*SUGAR GRV; B 138.0 - SUGAR GRV; R 138.0
 TRIP BRANCH FROM BUS 271390 TO BUS 271586 CKT 1       /*ELECT JCT; B 138.0 - ESS W541 ; B 138.0
 TRIP BRANCH FROM BUS 271586 TO BUS 272114 CKT 1       /*ESS W541 ; B 138.0 - N AURORA ; B 138.0
 TRIP BRANCH FROM BUS 272114 TO BUS 272522 CKT 1       /*N AURORA ; B 138.0 - SUGAR GRV; B 138.0
 TRIP BRANCH FROM BUS 962690 TO BUS 272522 CKT 1       /*AG1-118 TP   138.0 - SUGAR GRV; B 138.0
END
OP AC 121.05 % 449.0 B 543.51 121.26
CE AE2-341 TP-W PLANO ; R 138.0 kV Ckt 1 line
943120 to 272803 ckt 1
Base Case OP AC 121.1 % 351.0 A 425.07 78.85
CE SUGAR GRV; B-N AURORA ; B 138.0 kV Ckt 1 line
272522 to 272114 ckt 1
272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A
CONTINGENCY '272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A'
 OPEN BRANCH FROM BUS 272803 TO BUS 943120 CKT 1   /*W PLANO  ; R 138.0 - AE2-341 TP   138.0
END
OP AC 116.69 % 374.0 B 436.43 135.05
CE W PLANO ; R-PLANO; R 138.0 kV Ckt 1 line
272803 to 272251 ckt 1
COMED_P1-2_138-L11106_B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_138-L11106_B-R_SRT-A-2'
 CLOSE LINE FROM BUS 272114 TO BUS 272115 CKT Z1       /*N AURORA ; B 138.0 - N AURORA ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 271586 TO BUS 271587   /*ESS W541 ; B 138.0 - ESS W541 ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 272522 TO BUS 272523   /*SUGAR GRV; B 138.0 - SUGAR GRV; R 138.0
 TRIP BRANCH FROM BUS 271390 TO BUS 271586 CKT 1       /*ELECT JCT; B 138.0 - ESS W541 ; B 138.0
 TRIP BRANCH FROM BUS 271586 TO BUS 272114 CKT 1       /*ESS W541 ; B 138.0 - N AURORA ; B 138.0
 TRIP BRANCH FROM BUS 272114 TO BUS 272522 CKT 1       /*N AURORA ; B 138.0 - SUGAR GRV; B 138.0
 TRIP BRANCH FROM BUS 962690 TO BUS 272522 CKT 1       /*AG1-118 TP   138.0 - SUGAR GRV; B 138.0
END
OP AC 114.37 % 449.0 B 513.54 121.26
CE CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
Base Case OP AC 111.83 % 1201.0 A 1343.13 16.95
CE WATERMAN ; B-SANDWICH ; R 138.0 kV Ckt 1 line
272728 to 272445 ckt 1
Base Case OP AC 114.95 % 238.0 A 273.57 78.85
CE W PLANO ; R-PLANO; R 138.0 kV Ckt 1 line
272803 to 272251 ckt 1
Base Case OP AC 112.73 % 351.0 A 395.67 78.85
CE ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Base Case OP AC 110.02 % 1201.0 A 1321.35 31.09
AEP/AMIL J1180 POI-05SULLIVAN 345.0 kV Ckt 1 line
956820 to 247712 ckt 1
Base Case OP AC 110.12 % 1334.0 A 1468.99 15.26
CE/MEC QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line
270866 to 636610 ckt 1
EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S
CONTINGENCY 'EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S'
 OPEN BRANCH FROM BUS 636600 TO BUS 636605 CKT 1   /*SUB 39 3     345.0 - MEC CORDOVA3 345.0
END
OP AC 109.0 % 1471.0 B 1603.34 20.46
CE AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line
930480 to 270916 ckt 1
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A'
 TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1   /*SILVER LK; R 345.0 - GARDEN PR; R 345.0
END
OP AC 104.06 % 2058.0 B 2141.62 16.66
CE AG1-118 TP-SUGAR GRV; B 138.0 kV Ckt 1 line
962690 to 272522 ckt 1
272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A
CONTINGENCY '272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A'
 OPEN BRANCH FROM BUS 272803 TO BUS 943120 CKT 1   /*W PLANO  ; R 138.0 - AE2-341 TP   138.0
END
OP AC 100.29 % 483.0 B 484.39 135.05
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
OP AC 106.9 % 1841.0 B 1967.95 43.43

Details for GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 138.08 %
Rating: 1479.0 MVA
Rating Type: B
MVA to Mitigate: 2042.19 MVA
MW Contribution: 20.56 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 138.59 %
Rating: 1479.0 MVA
Rating Type: B
MVA to Mitigate: 2049.82 MVA
MW Contribution: 20.35 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.05 MW 1.74 MW
962012 AG1-044 E Adder 0.07 MW 0.06 MW
962781 AG1-127 C Adder 4.92 MW 4.18 MW
962782 AG1-127 E Adder 3.28 MW 2.78 MW
290051 GSG-6; E Adder 8.23 MW 6.99 MW
295109 WESTBROOK E Adder 4.4 MW 3.74 MW
295111 SUBLETTE E Adder 2.14 MW 1.82 MW
933911 AD1-013 C Adder 1.43 MW 1.21 MW
933912 AD1-013 E Adder 2.28 MW 1.94 MW
937002 AD2-134 E Adder 7.96 MW 6.76 MW
937312 AD2-172 E 50/50 6.05 MW 6.05 MW
942991 AE2-321 C Adder 4.66 MW 3.96 MW
942992 AE2-321 E Adder 2.3 MW 1.95 MW
958912 AF2-182 E Adder 48.39 MW 41.13 MW
959081 AF2-199 C Adder 3.53 MW 3.0 MW
959082 AF2-199 E Adder 1.77 MW 1.5 MW
960582 AF2-349 E 50/50 148.5 MW 148.5 MW
960751 AF2-366 C Adder 4.91 MW 4.17 MW
960752 AF2-366 E Adder 3.27 MW 2.78 MW
274656 BYRON ;1U 50/50 48.42 MW 48.42 MW
274657 BYRON ;2U 50/50 47.36 MW 47.36 MW
274822 ROCKFORD ;11 50/50 7.08 MW 7.08 MW
274823 ROCKFORD ;21 50/50 7.11 MW 7.11 MW
274824 ROCKFORD ;12 50/50 7.03 MW 7.03 MW
274856 ECOGROVE ;U1 50/50 0.66 MW 0.66 MW
274859 EASYR;U1 E Adder 18.53 MW 15.75 MW
274860 EASYR;U2 E Adder 18.53 MW 15.75 MW
276590 R-018 50/50 0.26 MW 0.26 MW
293715 O-029 E Adder 9.22 MW 7.84 MW
293716 O-029 E Adder 5.06 MW 4.3 MW
293717 O-029 E Adder 4.65 MW 3.95 MW
294763 P-046 E 50/50 16.82 MW 16.82 MW
939061 AE1-134 2 Adder 1.54 MW 1.31 MW
940502 AE2-035 E 50/50 6.05 MW 6.05 MW
957471 AF2-041 C Adder 10.59 MW 9.0 MW
957472 AF2-041 E Adder 5.3 MW 4.5 MW
274760 LEE CO EC;1U 50/50 2.45 MW 2.45 MW
276611 AD2-172 C 50/50 0.72 MW 0.72 MW
276612 AE2-035 C 50/50 0.72 MW 0.72 MW
293516 O-009 E Adder 17.84 MW 15.16 MW
290108 LEEDK;1U E Adder 15.73 MW 13.37 MW
916221 Z1-073 E Adder 5.8 MW 4.93 MW
274761 LEE CO EC;2U 50/50 2.45 MW 2.45 MW
274762 LEE CO EC;3U 50/50 2.45 MW 2.45 MW
274763 LEE CO EC;4U 50/50 2.43 MW 2.43 MW
274764 LEE CO EC;5U 50/50 2.46 MW 2.46 MW
274765 LEE CO EC;6U 50/50 2.46 MW 2.46 MW
959091 AF2-200 C Adder 7.06 MW 6.0 MW
959092 AF2-200 E Adder 4.71 MW 4.0 MW
961011 AF2-392 C Adder 4.49 MW 3.82 MW
961012 AF2-392 E Adder 20.91 MW 17.77 MW
966822 AG1-553 E Adder 26.14 MW 22.22 MW
930481 AB1-089 C 50/50 139.47 MW 139.47 MW
930482 AB1-089 E 50/50 6.34 MW 6.34 MW
938861 AE1-114 C 50/50 6.03 MW 6.03 MW
938862 AE1-114 E 50/50 20.55 MW 20.55 MW
946152 AF1-280 E Adder 32.26 MW 27.42 MW
946321 AF1-296 C Adder 3.49 MW 2.97 MW
946322 AF1-296 E Adder 16.35 MW 13.9 MW
946671 AF1-331 C Adder 1.86 MW 1.58 MW
962691 AG1-118 C Adder 12.33 MW 10.48 MW
962692 AG1-118 E Adder 8.22 MW 6.99 MW
965931 AG1-462 C Adder 15.38 MW 13.07 MW
965932 AG1-462 E Adder 10.25 MW 8.72 MW
276626 AG1-044 E Adder 0.08 MW 0.07 MW
920272 AA2-123 E Adder 1.2 MW 1.02 MW
990512 J1326 G External Queue 9.62 MW 9.62 MW
991092 J1477 External Queue 2.92 MW 2.92 MW
955972 J1084 External Queue 11.01 MW 11.01 MW
956412 J1131 External Queue 5.83 MW 5.83 MW
990117 J1214 G External Queue 38.41 MW 38.41 MW
990407 J1304 G External Queue 9.36 MW 9.36 MW
990727 J1377 G External Queue 16.43 MW 16.43 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
990948 J1432 E External Queue 15.16 MW 15.16 MW
991777 J1629 G External Queue 10.95 MW 10.95 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.9 MW 59.9 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.75 MW 6.75 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.49 MW 0.49 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.04 MW 0.04 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.84 MW 9.84 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.29 MW 2.29 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.17 MW 3.17 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.09 MW 0.09 MW

Details for WATERMAN ; B-SANDWICH ; R 138.0 kV Ckt 1 line l/o COMED_P1-2_138-L11106_B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
WATERMAN ; B-SANDWICH ; R 138.0 kV Ckt 1 line
272728 to 272445 ckt 1
Contingency Name:
COMED_P1-2_138-L11106_B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_138-L11106_B-R_SRT-A-2'
 CLOSE LINE FROM BUS 272114 TO BUS 272115 CKT Z1       /*N AURORA ; B 138.0 - N AURORA ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 271586 TO BUS 271587   /*ESS W541 ; B 138.0 - ESS W541 ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 272522 TO BUS 272523   /*SUGAR GRV; B 138.0 - SUGAR GRV; R 138.0
 TRIP BRANCH FROM BUS 271390 TO BUS 271586 CKT 1       /*ELECT JCT; B 138.0 - ESS W541 ; B 138.0
 TRIP BRANCH FROM BUS 271586 TO BUS 272114 CKT 1       /*ESS W541 ; B 138.0 - N AURORA ; B 138.0
 TRIP BRANCH FROM BUS 272114 TO BUS 272522 CKT 1       /*N AURORA ; B 138.0 - SUGAR GRV; B 138.0
 TRIP BRANCH FROM BUS 962690 TO BUS 272522 CKT 1       /*AG1-118 TP   138.0 - SUGAR GRV; B 138.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 132.09 %
Rating: 309.0 MVA
Rating Type: B
MVA to Mitigate: 408.17 MVA
MW Contribution: 121.26 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
WATERMAN ; B-SANDWICH ; R 138.0 kV Ckt 1 line
272728 to 272445 ckt 1
Contingency Name:
COMED_P1-2_138-L11106_B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_138-L11106_B-R_SRT-A-2'
 CLOSE LINE FROM BUS 272114 TO BUS 272115 CKT Z1       /*N AURORA ; B 138.0 - N AURORA ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 271586 TO BUS 271587   /*ESS W541 ; B 138.0 - ESS W541 ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 272522 TO BUS 272523   /*SUGAR GRV; B 138.0 - SUGAR GRV; R 138.0
 TRIP BRANCH FROM BUS 271390 TO BUS 271586 CKT 1       /*ELECT JCT; B 138.0 - ESS W541 ; B 138.0
 TRIP BRANCH FROM BUS 271586 TO BUS 272114 CKT 1       /*ESS W541 ; B 138.0 - N AURORA ; B 138.0
 TRIP BRANCH FROM BUS 272114 TO BUS 272522 CKT 1       /*N AURORA ; B 138.0 - SUGAR GRV; B 138.0
 TRIP BRANCH FROM BUS 962690 TO BUS 272522 CKT 1       /*AG1-118 TP   138.0 - SUGAR GRV; B 138.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 129.28 %
Rating: 309.0 MVA
Rating Type: B
MVA to Mitigate: 399.47 MVA
MW Contribution: 122.92 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 6.79 MW 6.79 MW
962781 AG1-127 C 50/50 21.96 MW 21.96 MW
962782 AG1-127 E 50/50 14.61 MW 14.61 MW
290051 GSG-6; E 50/50 26.58 MW 26.58 MW
295109 WESTBROOK E 50/50 14.23 MW 14.23 MW
295111 SUBLETTE E 50/50 6.92 MW 6.92 MW
933911 AD1-013 C 50/50 4.78 MW 4.78 MW
933912 AD1-013 E 50/50 7.63 MW 7.63 MW
937001 AD2-134 C 50/50 1.04 MW 1.04 MW
937002 AD2-134 E 50/50 25.7 MW 25.7 MW
960751 AF2-366 C 50/50 21.9 MW 21.9 MW
960752 AF2-366 E 50/50 14.6 MW 14.6 MW
274855 GSG-6 ;RU 50/50 1.09 MW 1.09 MW
276602 WESTBROOK C 50/50 0.35 MW 0.35 MW
276603 SUBLETTE C 50/50 0.16 MW 0.16 MW
274872 LEE DEKAL;1U 50/50 2.51 MW 2.51 MW
290108 LEEDK;1U E 50/50 75.94 MW 75.94 MW
274850 MENDOTA H;RU 50/50 0.71 MW 0.71 MW
916221 Z1-073 E 50/50 18.73 MW 18.73 MW
961011 AF2-392 C Adder 1.83 MW 1.55 MW
961012 AF2-392 E Adder 8.5 MW 7.23 MW
938861 AE1-114 C Adder 1.97 MW 1.68 MW
938862 AE1-114 E Adder 6.74 MW 5.73 MW
946671 AF1-331 C 50/50 6.2 MW 6.2 MW
962691 AG1-118 C 50/50 72.75 MW 72.75 MW
962692 AG1-118 E 50/50 48.5 MW 48.5 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 13.96 MW 13.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.66 MW 1.66 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.07 MW 0.07 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.11 MW 0.11 MW
NY PJM->LTFIMP_NY CLTF 0.06 MW 0.06 MW
WEC LTFEXP_WEC->PJM CLTF 0.35 MW 0.35 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.23 MW 0.23 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.04 MW 0.04 MW
MEC LTFEXP_MEC->PJM CLTF 2.22 MW 2.22 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.11 MW 0.11 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.54 MW 0.54 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.69 MW 0.69 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.01 MW 0.01 MW

Details for CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 127.92 %
Rating: 1479.0 MVA
Rating Type: B
MVA to Mitigate: 1891.97 MVA
MW Contribution: 20.56 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 930480 TO BUS 270916 CKT 1   /*AB1-089 TP   345.0 - WAYNE    ; B 345.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 128.43 %
Rating: 1479.0 MVA
Rating Type: B
MVA to Mitigate: 1899.55 MVA
MW Contribution: 20.35 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.05 MW 1.74 MW
962012 AG1-044 E Adder 0.07 MW 0.06 MW
962781 AG1-127 C Adder 4.92 MW 4.18 MW
962782 AG1-127 E Adder 3.28 MW 2.78 MW
290051 GSG-6; E Adder 8.23 MW 6.99 MW
295109 WESTBROOK E Adder 4.4 MW 3.74 MW
295111 SUBLETTE E Adder 2.14 MW 1.82 MW
933911 AD1-013 C Adder 1.43 MW 1.21 MW
933912 AD1-013 E Adder 2.28 MW 1.94 MW
937002 AD2-134 E Adder 7.96 MW 6.76 MW
937312 AD2-172 E 50/50 6.05 MW 6.05 MW
942991 AE2-321 C Adder 4.66 MW 3.96 MW
942992 AE2-321 E Adder 2.3 MW 1.95 MW
958912 AF2-182 E Adder 48.39 MW 41.13 MW
959081 AF2-199 C Adder 3.53 MW 3.0 MW
959082 AF2-199 E Adder 1.77 MW 1.5 MW
960751 AF2-366 C Adder 4.91 MW 4.17 MW
960752 AF2-366 E Adder 3.27 MW 2.78 MW
274656 BYRON ;1U 50/50 48.42 MW 48.42 MW
274657 BYRON ;2U 50/50 47.36 MW 47.36 MW
274822 ROCKFORD ;11 50/50 7.08 MW 7.08 MW
274823 ROCKFORD ;21 50/50 7.11 MW 7.11 MW
274824 ROCKFORD ;12 50/50 7.03 MW 7.03 MW
274856 ECOGROVE ;U1 50/50 0.66 MW 0.66 MW
274859 EASYR;U1 E Adder 18.53 MW 15.75 MW
274860 EASYR;U2 E Adder 18.53 MW 15.75 MW
276590 R-018 50/50 0.26 MW 0.26 MW
293715 O-029 E Adder 9.22 MW 7.84 MW
293716 O-029 E Adder 5.06 MW 4.3 MW
293717 O-029 E Adder 4.65 MW 3.95 MW
294763 P-046 E 50/50 16.82 MW 16.82 MW
939061 AE1-134 2 Adder 1.54 MW 1.31 MW
940502 AE2-035 E 50/50 6.05 MW 6.05 MW
957471 AF2-041 C Adder 10.59 MW 9.0 MW
957472 AF2-041 E Adder 5.3 MW 4.5 MW
274760 LEE CO EC;1U 50/50 2.45 MW 2.45 MW
276611 AD2-172 C 50/50 0.72 MW 0.72 MW
276612 AE2-035 C 50/50 0.72 MW 0.72 MW
293516 O-009 E Adder 17.84 MW 15.16 MW
290108 LEEDK;1U E Adder 15.73 MW 13.37 MW
916221 Z1-073 E Adder 5.8 MW 4.93 MW
274761 LEE CO EC;2U 50/50 2.45 MW 2.45 MW
274762 LEE CO EC;3U 50/50 2.45 MW 2.45 MW
274763 LEE CO EC;4U 50/50 2.43 MW 2.43 MW
274764 LEE CO EC;5U 50/50 2.46 MW 2.46 MW
274765 LEE CO EC;6U 50/50 2.46 MW 2.46 MW
959091 AF2-200 C Adder 7.06 MW 6.0 MW
959092 AF2-200 E Adder 4.71 MW 4.0 MW
961011 AF2-392 C Adder 4.49 MW 3.82 MW
961012 AF2-392 E Adder 20.91 MW 17.77 MW
966822 AG1-553 E Adder 26.14 MW 22.22 MW
930481 AB1-089 C 50/50 139.47 MW 139.47 MW
930482 AB1-089 E 50/50 6.34 MW 6.34 MW
938861 AE1-114 C 50/50 6.03 MW 6.03 MW
938862 AE1-114 E 50/50 20.55 MW 20.55 MW
946152 AF1-280 E Adder 32.26 MW 27.42 MW
946321 AF1-296 C Adder 3.49 MW 2.97 MW
946322 AF1-296 E Adder 16.35 MW 13.9 MW
946671 AF1-331 C Adder 1.86 MW 1.58 MW
962691 AG1-118 C Adder 12.33 MW 10.48 MW
962692 AG1-118 E Adder 8.22 MW 6.99 MW
965931 AG1-462 C Adder 15.38 MW 13.07 MW
965932 AG1-462 E Adder 10.25 MW 8.72 MW
276626 AG1-044 E Adder 0.08 MW 0.07 MW
920272 AA2-123 E Adder 1.2 MW 1.02 MW
955972 J1084 External Queue 11.01 MW 11.01 MW
956412 J1131 External Queue 5.83 MW 5.83 MW
990117 J1214 G External Queue 38.41 MW 38.41 MW
990407 J1304 G External Queue 9.36 MW 9.36 MW
990512 J1326 G External Queue 9.62 MW 9.62 MW
990727 J1377 G External Queue 16.43 MW 16.43 MW
990947 J1432 C External Queue 2.8 MW 2.8 MW
990948 J1432 E External Queue 15.16 MW 15.16 MW
991092 J1477 External Queue 2.92 MW 2.92 MW
991777 J1629 G External Queue 10.95 MW 10.95 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 59.9 MW 59.9 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 6.75 MW 6.75 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.49 MW 0.49 MW
NY PJM->LTFIMP_NY CLTF 0.27 MW 0.27 MW
WEC LTFEXP_WEC->PJM CLTF 0.53 MW 0.53 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.04 MW 0.04 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.92 MW 0.92 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.19 MW 0.19 MW
MEC LTFEXP_MEC->PJM CLTF 9.84 MW 9.84 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.55 MW 0.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.29 MW 2.29 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.17 MW 3.17 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.09 MW 0.09 MW

Details for GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 123.41 %
Rating: 1201.0 MVA
Rating Type: A
MVA to Mitigate: 1482.14 MVA
MW Contribution: 16.95 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
GARDEN PR; R-SILVER LK; R 345.0 kV Ckt 1 line
276670 to 270883 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 123.58 %
Rating: 1201.0 MVA
Rating Type: A
MVA to Mitigate: 1484.23 MVA
MW Contribution: 16.81 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.61 MW 1.37 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C Adder 4.02 MW 3.42 MW
962782 AG1-127 E Adder 2.68 MW 2.27 MW
290051 GSG-6; E Adder 6.45 MW 5.49 MW
295109 WESTBROOK E Adder 3.46 MW 2.94 MW
295111 SUBLETTE E Adder 1.68 MW 1.43 MW
933911 AD1-013 C Adder 1.12 MW 0.95 MW
933912 AD1-013 E Adder 1.79 MW 1.52 MW
937002 AD2-134 E Adder 6.24 MW 5.3 MW
937312 AD2-172 E 50/50 4.7 MW 4.7 MW
958912 AF2-182 E Adder 34.11 MW 28.99 MW
960582 AF2-349 E 50/50 137.35 MW 137.35 MW
960751 AF2-366 C Adder 4.01 MW 3.41 MW
960752 AF2-366 E Adder 2.67 MW 2.27 MW
274656 BYRON ;1U 50/50 33.6 MW 33.6 MW
274657 BYRON ;2U 50/50 32.94 MW 32.94 MW
274822 ROCKFORD ;11 50/50 5.63 MW 5.63 MW
274823 ROCKFORD ;21 50/50 5.66 MW 5.66 MW
274824 ROCKFORD ;12 50/50 5.59 MW 5.59 MW
274856 ECOGROVE ;U1 50/50 0.51 MW 0.51 MW
274859 EASYR;U1 E Adder 13.01 MW 11.06 MW
274860 EASYR;U2 E Adder 13.01 MW 11.06 MW
276590 R-018 50/50 0.2 MW 0.2 MW
293715 O-029 E Adder 6.69 MW 5.69 MW
293716 O-029 E Adder 3.67 MW 3.12 MW
293717 O-029 E Adder 3.37 MW 2.87 MW
294763 P-046 E 50/50 13.06 MW 13.06 MW
939061 AE1-134 2 Adder 1.1 MW 0.94 MW
940502 AE2-035 E 50/50 4.7 MW 4.7 MW
274760 LEE CO EC;1U 50/50 1.72 MW 1.72 MW
276611 AD2-172 C 50/50 0.56 MW 0.56 MW
276612 AE2-035 C 50/50 0.56 MW 0.56 MW
293516 O-009 E Adder 12.94 MW 11.0 MW
290108 LEEDK;1U E Adder 12.7 MW 10.8 MW
916221 Z1-073 E Adder 4.55 MW 3.87 MW
274761 LEE CO EC;2U 50/50 1.72 MW 1.72 MW
274762 LEE CO EC;3U 50/50 1.72 MW 1.72 MW
274763 LEE CO EC;4U 50/50 1.71 MW 1.71 MW
274764 LEE CO EC;5U 50/50 1.73 MW 1.73 MW
274765 LEE CO EC;6U 50/50 1.73 MW 1.73 MW
961011 AF2-392 C Adder 3.28 MW 2.79 MW
961012 AF2-392 E Adder 15.26 MW 12.97 MW
966822 AG1-553 E Adder 18.7 MW 15.9 MW
930481 AB1-089 C 50/50 78.03 MW 78.03 MW
930482 AB1-089 E 50/50 3.55 MW 3.55 MW
938861 AE1-114 C 50/50 4.61 MW 4.61 MW
938862 AE1-114 E 50/50 15.74 MW 15.74 MW
946152 AF1-280 E Adder 22.74 MW 19.33 MW
946321 AF1-296 C Adder 2.52 MW 2.14 MW
946322 AF1-296 E Adder 11.78 MW 10.01 MW
946671 AF1-331 C Adder 1.46 MW 1.24 MW
962691 AG1-118 C Adder 10.17 MW 8.64 MW
962692 AG1-118 E Adder 6.78 MW 5.76 MW
965931 AG1-462 C Adder 11.01 MW 9.36 MW
965932 AG1-462 E Adder 7.34 MW 6.24 MW
276626 AG1-044 E Adder 0.06 MW 0.05 MW
955972 J1084 External Queue 7.95 MW 7.95 MW
990117 J1214 G External Queue 28.89 MW 28.89 MW
990407 J1304 G External Queue 7.07 MW 7.07 MW
990512 J1326 G External Queue 7.23 MW 7.23 MW
990727 J1377 G External Queue 12.48 MW 12.48 MW
990947 J1432 C External Queue 2.03 MW 2.03 MW
990948 J1432 E External Queue 10.99 MW 10.99 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 41.78 MW 41.78 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 4.87 MW 4.87 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.04 MW 0.04 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.35 MW 0.35 MW
NY PJM->LTFIMP_NY CLTF 0.19 MW 0.19 MW
WEC LTFEXP_WEC->PJM CLTF 0.18 MW 0.18 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.03 MW 0.03 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.0 MW 0.0 MW
TVA LTFEXP_TVA->PJM CLTF 0.67 MW 0.67 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.13 MW 0.13 MW
MEC LTFEXP_MEC->PJM CLTF 7.05 MW 7.05 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.38 MW 0.38 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.65 MW 1.65 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.23 MW 2.23 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.06 MW 0.06 MW

Details for AE2-341 TP-W PLANO ; R 138.0 kV Ckt 1 line l/o COMED_P1-2_138-L11106_B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
AE2-341 TP-W PLANO ; R 138.0 kV Ckt 1 line
943120 to 272803 ckt 1
Contingency Name:
COMED_P1-2_138-L11106_B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_138-L11106_B-R_SRT-A-2'
 CLOSE LINE FROM BUS 272114 TO BUS 272115 CKT Z1       /*N AURORA ; B 138.0 - N AURORA ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 271586 TO BUS 271587   /*ESS W541 ; B 138.0 - ESS W541 ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 272522 TO BUS 272523   /*SUGAR GRV; B 138.0 - SUGAR GRV; R 138.0
 TRIP BRANCH FROM BUS 271390 TO BUS 271586 CKT 1       /*ELECT JCT; B 138.0 - ESS W541 ; B 138.0
 TRIP BRANCH FROM BUS 271586 TO BUS 272114 CKT 1       /*ESS W541 ; B 138.0 - N AURORA ; B 138.0
 TRIP BRANCH FROM BUS 272114 TO BUS 272522 CKT 1       /*N AURORA ; B 138.0 - SUGAR GRV; B 138.0
 TRIP BRANCH FROM BUS 962690 TO BUS 272522 CKT 1       /*AG1-118 TP   138.0 - SUGAR GRV; B 138.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 121.05 %
Rating: 449.0 MVA
Rating Type: B
MVA to Mitigate: 543.51 MVA
MW Contribution: 121.26 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
AE2-341 TP-W PLANO ; R 138.0 kV Ckt 1 line
943120 to 272803 ckt 1
Contingency Name:
COMED_P1-2_138-L11106_B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_138-L11106_B-R_SRT-A-2'
 CLOSE LINE FROM BUS 272114 TO BUS 272115 CKT Z1       /*N AURORA ; B 138.0 - N AURORA ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 271586 TO BUS 271587   /*ESS W541 ; B 138.0 - ESS W541 ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 272522 TO BUS 272523   /*SUGAR GRV; B 138.0 - SUGAR GRV; R 138.0
 TRIP BRANCH FROM BUS 271390 TO BUS 271586 CKT 1       /*ELECT JCT; B 138.0 - ESS W541 ; B 138.0
 TRIP BRANCH FROM BUS 271586 TO BUS 272114 CKT 1       /*ESS W541 ; B 138.0 - N AURORA ; B 138.0
 TRIP BRANCH FROM BUS 272114 TO BUS 272522 CKT 1       /*N AURORA ; B 138.0 - SUGAR GRV; B 138.0
 TRIP BRANCH FROM BUS 962690 TO BUS 272522 CKT 1       /*AG1-118 TP   138.0 - SUGAR GRV; B 138.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 119.38 %
Rating: 449.0 MVA
Rating Type: B
MVA to Mitigate: 536.03 MVA
MW Contribution: 122.92 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 6.79 MW 6.79 MW
962781 AG1-127 C 50/50 21.96 MW 21.96 MW
962782 AG1-127 E 50/50 14.61 MW 14.61 MW
290051 GSG-6; E 50/50 26.58 MW 26.58 MW
295109 WESTBROOK E 50/50 14.23 MW 14.23 MW
295111 SUBLETTE E 50/50 6.92 MW 6.92 MW
933911 AD1-013 C 50/50 4.78 MW 4.78 MW
933912 AD1-013 E 50/50 7.63 MW 7.63 MW
937001 AD2-134 C 50/50 1.04 MW 1.04 MW
937002 AD2-134 E 50/50 25.7 MW 25.7 MW
960751 AF2-366 C 50/50 21.9 MW 21.9 MW
960752 AF2-366 E 50/50 14.6 MW 14.6 MW
274855 GSG-6 ;RU 50/50 1.09 MW 1.09 MW
276602 WESTBROOK C 50/50 0.35 MW 0.35 MW
276603 SUBLETTE C 50/50 0.16 MW 0.16 MW
274872 LEE DEKAL;1U 50/50 2.51 MW 2.51 MW
290108 LEEDK;1U E 50/50 75.94 MW 75.94 MW
274850 MENDOTA H;RU 50/50 0.71 MW 0.71 MW
916221 Z1-073 E 50/50 18.73 MW 18.73 MW
943121 AE2-341 C 50/50 82.48 MW 82.48 MW
943122 AE2-341 E 50/50 40.5 MW 40.5 MW
943591 AF1-030 C 50/50 54.85 MW 54.85 MW
943592 AF1-030 E 50/50 27.14 MW 27.14 MW
946671 AF1-331 C 50/50 6.2 MW 6.2 MW
962691 AG1-118 C 50/50 72.75 MW 72.75 MW
962692 AG1-118 E 50/50 48.5 MW 48.5 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 13.96 MW 13.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.66 MW 1.66 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.07 MW 0.07 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.11 MW 0.11 MW
NY PJM->LTFIMP_NY CLTF 0.06 MW 0.06 MW
WEC LTFEXP_WEC->PJM CLTF 0.35 MW 0.35 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.23 MW 0.23 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.04 MW 0.04 MW
MEC LTFEXP_MEC->PJM CLTF 2.22 MW 2.22 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.11 MW 0.11 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.54 MW 0.54 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.69 MW 0.69 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.01 MW 0.01 MW

Details for AE2-341 TP-W PLANO ; R 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
AE2-341 TP-W PLANO ; R 138.0 kV Ckt 1 line
943120 to 272803 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 121.1 %
Rating: 351.0 MVA
Rating Type: A
MVA to Mitigate: 425.07 MVA
MW Contribution: 78.85 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
AE2-341 TP-W PLANO ; R 138.0 kV Ckt 1 line
943120 to 272803 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 119.19 %
Rating: 351.0 MVA
Rating Type: A
MVA to Mitigate: 418.35 MVA
MW Contribution: 79.64 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 4.89 MW 4.89 MW
962781 AG1-127 C 50/50 15.41 MW 15.41 MW
962782 AG1-127 E 50/50 10.26 MW 10.26 MW
290051 GSG-6; E 50/50 19.16 MW 19.16 MW
295109 WESTBROOK E 50/50 10.26 MW 10.26 MW
295111 SUBLETTE E 50/50 4.99 MW 4.99 MW
933911 AD1-013 C 50/50 3.44 MW 3.44 MW
933912 AD1-013 E 50/50 5.5 MW 5.5 MW
937001 AD2-134 C 50/50 0.75 MW 0.75 MW
937002 AD2-134 E 50/50 18.52 MW 18.52 MW
960751 AF2-366 C 50/50 15.37 MW 15.37 MW
960752 AF2-366 E 50/50 10.25 MW 10.25 MW
274855 GSG-6 ;RU 50/50 0.78 MW 0.78 MW
276602 WESTBROOK C 50/50 0.25 MW 0.25 MW
276603 SUBLETTE C 50/50 0.11 MW 0.11 MW
274872 LEE DEKAL;1U 50/50 1.81 MW 1.81 MW
290108 LEEDK;1U E 50/50 54.65 MW 54.65 MW
274850 MENDOTA H;RU 50/50 0.52 MW 0.52 MW
916221 Z1-073 E 50/50 13.5 MW 13.5 MW
943121 AE2-341 C 50/50 79.42 MW 79.42 MW
943122 AE2-341 E 50/50 39.0 MW 39.0 MW
943591 AF1-030 C 50/50 52.82 MW 52.82 MW
943592 AF1-030 E 50/50 26.13 MW 26.13 MW
946671 AF1-331 C 50/50 4.47 MW 4.47 MW
962691 AG1-118 C 50/50 47.31 MW 47.31 MW
962692 AG1-118 E 50/50 31.54 MW 31.54 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 10.97 MW 10.97 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.27 MW 1.27 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.02 MW 0.02 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.09 MW 0.09 MW
NY PJM->LTFIMP_NY CLTF 0.05 MW 0.05 MW
WEC LTFEXP_WEC->PJM CLTF 0.29 MW 0.29 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.01 MW 0.01 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.0 MW 0.0 MW
TVA LTFEXP_TVA->PJM CLTF 0.17 MW 0.17 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.03 MW 0.03 MW
MEC LTFEXP_MEC->PJM CLTF 1.72 MW 1.72 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.09 MW 0.09 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.41 MW 0.41 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.56 MW 0.56 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.01 MW 0.01 MW

Details for SUGAR GRV; B-N AURORA ; B 138.0 kV Ckt 1 line l/o 272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
SUGAR GRV; B-N AURORA ; B 138.0 kV Ckt 1 line
272522 to 272114 ckt 1
Contingency Name:
272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A
CONTINGENCY '272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A'
 OPEN BRANCH FROM BUS 272803 TO BUS 943120 CKT 1   /*W PLANO  ; R 138.0 - AE2-341 TP   138.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 116.69 %
Rating: 374.0 MVA
Rating Type: B
MVA to Mitigate: 436.43 MVA
MW Contribution: 135.05 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
SUGAR GRV; B-N AURORA ; B 138.0 kV Ckt 1 line
272522 to 272114 ckt 1
Contingency Name:
272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A
CONTINGENCY '272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A'
 OPEN BRANCH FROM BUS 272803 TO BUS 943120 CKT 1   /*W PLANO  ; R 138.0 - AE2-341 TP   138.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 114.79 %
Rating: 374.0 MVA
Rating Type: B
MVA to Mitigate: 429.31 MVA
MW Contribution: 136.59 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 6.61 MW 6.61 MW
962781 AG1-127 C 50/50 22.2 MW 22.2 MW
962782 AG1-127 E 50/50 14.78 MW 14.78 MW
290051 GSG-6; E 50/50 25.88 MW 25.88 MW
295109 WESTBROOK E 50/50 13.86 MW 13.86 MW
295111 SUBLETTE E 50/50 6.74 MW 6.74 MW
933911 AD1-013 C 50/50 4.65 MW 4.65 MW
933912 AD1-013 E 50/50 7.43 MW 7.43 MW
937001 AD2-134 C 50/50 1.01 MW 1.01 MW
937002 AD2-134 E 50/50 25.02 MW 25.02 MW
960751 AF2-366 C 50/50 22.14 MW 22.14 MW
960752 AF2-366 E 50/50 14.76 MW 14.76 MW
274855 GSG-6 ;RU 50/50 1.06 MW 1.06 MW
276602 WESTBROOK C 50/50 0.34 MW 0.34 MW
276603 SUBLETTE C 50/50 0.15 MW 0.15 MW
274872 LEE DEKAL;1U 50/50 2.45 MW 2.45 MW
290108 LEEDK;1U E 50/50 74.08 MW 74.08 MW
274850 MENDOTA H;RU 50/50 0.69 MW 0.69 MW
916221 Z1-073 E 50/50 18.24 MW 18.24 MW
943121 AE2-341 C 50/50 40.46 MW 40.46 MW
943122 AE2-341 E 50/50 19.87 MW 19.87 MW
943591 AF1-030 C 50/50 26.9 MW 26.9 MW
943592 AF1-030 E 50/50 13.31 MW 13.31 MW
938861 AE1-114 C Adder 1.85 MW 1.57 MW
938862 AE1-114 E Adder 6.31 MW 5.37 MW
946671 AF1-331 C 50/50 6.04 MW 6.04 MW
962691 AG1-118 C 50/50 81.03 MW 81.03 MW
962692 AG1-118 E 50/50 54.02 MW 54.02 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 11.77 MW 11.77 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.46 MW 1.46 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.14 MW 0.14 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.08 MW 0.08 MW
NY PJM->LTFIMP_NY CLTF 0.05 MW 0.05 MW
WEC LTFEXP_WEC->PJM CLTF 0.26 MW 0.26 MW
TVA LTFEXP_TVA->PJM CLTF 0.2 MW 0.2 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.03 MW 0.03 MW
MEC LTFEXP_MEC->PJM CLTF 1.93 MW 1.93 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.08 MW 0.08 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.47 MW 0.47 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.54 MW 0.54 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.01 MW 0.01 MW

Details for W PLANO ; R-PLANO; R 138.0 kV Ckt 1 line l/o COMED_P1-2_138-L11106_B-R_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
W PLANO ; R-PLANO; R 138.0 kV Ckt 1 line
272803 to 272251 ckt 1
Contingency Name:
COMED_P1-2_138-L11106_B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_138-L11106_B-R_SRT-A-2'
 CLOSE LINE FROM BUS 272114 TO BUS 272115 CKT Z1       /*N AURORA ; B 138.0 - N AURORA ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 271586 TO BUS 271587   /*ESS W541 ; B 138.0 - ESS W541 ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 272522 TO BUS 272523   /*SUGAR GRV; B 138.0 - SUGAR GRV; R 138.0
 TRIP BRANCH FROM BUS 271390 TO BUS 271586 CKT 1       /*ELECT JCT; B 138.0 - ESS W541 ; B 138.0
 TRIP BRANCH FROM BUS 271586 TO BUS 272114 CKT 1       /*ESS W541 ; B 138.0 - N AURORA ; B 138.0
 TRIP BRANCH FROM BUS 272114 TO BUS 272522 CKT 1       /*N AURORA ; B 138.0 - SUGAR GRV; B 138.0
 TRIP BRANCH FROM BUS 962690 TO BUS 272522 CKT 1       /*AG1-118 TP   138.0 - SUGAR GRV; B 138.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 114.37 %
Rating: 449.0 MVA
Rating Type: B
MVA to Mitigate: 513.54 MVA
MW Contribution: 121.26 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
W PLANO ; R-PLANO; R 138.0 kV Ckt 1 line
272803 to 272251 ckt 1
Contingency Name:
COMED_P1-2_138-L11106_B-R_SRT-A-2
CONTINGENCY 'COMED_P1-2_138-L11106_B-R_SRT-A-2'
 CLOSE LINE FROM BUS 272114 TO BUS 272115 CKT Z1       /*N AURORA ; B 138.0 - N AURORA ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 271586 TO BUS 271587   /*ESS W541 ; B 138.0 - ESS W541 ; R 138.0
 MOVE 100 PERCENT LOAD FROM BUS 272522 TO BUS 272523   /*SUGAR GRV; B 138.0 - SUGAR GRV; R 138.0
 TRIP BRANCH FROM BUS 271390 TO BUS 271586 CKT 1       /*ELECT JCT; B 138.0 - ESS W541 ; B 138.0
 TRIP BRANCH FROM BUS 271586 TO BUS 272114 CKT 1       /*ESS W541 ; B 138.0 - N AURORA ; B 138.0
 TRIP BRANCH FROM BUS 272114 TO BUS 272522 CKT 1       /*N AURORA ; B 138.0 - SUGAR GRV; B 138.0
 TRIP BRANCH FROM BUS 962690 TO BUS 272522 CKT 1       /*AG1-118 TP   138.0 - SUGAR GRV; B 138.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 112.71 %
Rating: 449.0 MVA
Rating Type: B
MVA to Mitigate: 506.08 MVA
MW Contribution: 122.92 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 6.79 MW 6.79 MW
962781 AG1-127 C 50/50 21.96 MW 21.96 MW
962782 AG1-127 E 50/50 14.61 MW 14.61 MW
290051 GSG-6; E 50/50 26.58 MW 26.58 MW
295109 WESTBROOK E 50/50 14.23 MW 14.23 MW
295111 SUBLETTE E 50/50 6.92 MW 6.92 MW
933911 AD1-013 C 50/50 4.78 MW 4.78 MW
933912 AD1-013 E 50/50 7.63 MW 7.63 MW
937001 AD2-134 C 50/50 1.04 MW 1.04 MW
937002 AD2-134 E 50/50 25.7 MW 25.7 MW
960751 AF2-366 C 50/50 21.9 MW 21.9 MW
960752 AF2-366 E 50/50 14.6 MW 14.6 MW
274855 GSG-6 ;RU 50/50 1.09 MW 1.09 MW
276602 WESTBROOK C 50/50 0.35 MW 0.35 MW
276603 SUBLETTE C 50/50 0.16 MW 0.16 MW
274872 LEE DEKAL;1U 50/50 2.51 MW 2.51 MW
290108 LEEDK;1U E 50/50 75.94 MW 75.94 MW
274850 MENDOTA H;RU 50/50 0.71 MW 0.71 MW
916221 Z1-073 E 50/50 18.73 MW 18.73 MW
943121 AE2-341 C 50/50 82.48 MW 82.48 MW
943122 AE2-341 E 50/50 40.5 MW 40.5 MW
943591 AF1-030 C 50/50 54.85 MW 54.85 MW
943592 AF1-030 E 50/50 27.14 MW 27.14 MW
946671 AF1-331 C 50/50 6.2 MW 6.2 MW
962691 AG1-118 C 50/50 72.75 MW 72.75 MW
962692 AG1-118 E 50/50 48.5 MW 48.5 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 13.96 MW 13.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.66 MW 1.66 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.07 MW 0.07 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.11 MW 0.11 MW
NY PJM->LTFIMP_NY CLTF 0.06 MW 0.06 MW
WEC LTFEXP_WEC->PJM CLTF 0.35 MW 0.35 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 0.23 MW 0.23 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.04 MW 0.04 MW
MEC LTFEXP_MEC->PJM CLTF 2.22 MW 2.22 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.11 MW 0.11 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.54 MW 0.54 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.69 MW 0.69 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.01 MW 0.01 MW

Details for CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 111.83 %
Rating: 1201.0 MVA
Rating Type: A
MVA to Mitigate: 1343.13 MVA
MW Contribution: 16.95 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line
270694 to 276670 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 112.01 %
Rating: 1201.0 MVA
Rating Type: A
MVA to Mitigate: 1345.19 MVA
MW Contribution: 16.81 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.61 MW 1.37 MW
962012 AG1-044 E Adder 0.05 MW 0.04 MW
962781 AG1-127 C Adder 4.02 MW 3.42 MW
962782 AG1-127 E Adder 2.68 MW 2.27 MW
290051 GSG-6; E Adder 6.45 MW 5.49 MW
295109 WESTBROOK E Adder 3.46 MW 2.94 MW
295111 SUBLETTE E Adder 1.68 MW 1.43 MW
933911 AD1-013 C Adder 1.12 MW 0.95 MW
933912 AD1-013 E Adder 1.79 MW 1.52 MW
937002 AD2-134 E Adder 6.24 MW 5.3 MW
937312 AD2-172 E 50/50 4.7 MW 4.7 MW
958912 AF2-182 E Adder 34.11 MW 28.99 MW
960751 AF2-366 C Adder 4.01 MW 3.41 MW
960752 AF2-366 E Adder 2.67 MW 2.27 MW
274656 BYRON ;1U 50/50 33.6 MW 33.6 MW
274657 BYRON ;2U 50/50 32.94 MW 32.94 MW
274822 ROCKFORD ;11 50/50 5.63 MW 5.63 MW
274823 ROCKFORD ;21 50/50 5.66 MW 5.66 MW
274824 ROCKFORD ;12 50/50 5.59 MW 5.59 MW
274856 ECOGROVE ;U1 50/50 0.51 MW 0.51 MW
274859 EASYR;U1 E Adder 13.01 MW 11.06 MW
274860 EASYR;U2 E Adder 13.01 MW 11.06 MW
276590 R-018 50/50 0.2 MW 0.2 MW
293715 O-029 E Adder 6.69 MW 5.69 MW
293716 O-029 E Adder 3.67 MW 3.12 MW
293717 O-029 E Adder 3.37 MW 2.87 MW
294763 P-046 E 50/50 13.06 MW 13.06 MW
939061 AE1-134 2 Adder 1.1 MW 0.94 MW
940502 AE2-035 E 50/50 4.7 MW 4.7 MW
274760 LEE CO EC;1U 50/50 1.72 MW 1.72 MW
276611 AD2-172 C 50/50 0.56 MW 0.56 MW
276612 AE2-035 C 50/50 0.56 MW 0.56 MW
293516 O-009 E Adder 12.94 MW 11.0 MW
290108 LEEDK;1U E Adder 12.7 MW 10.8 MW
916221 Z1-073 E Adder 4.55 MW 3.87 MW
274761 LEE CO EC;2U 50/50 1.72 MW 1.72 MW
274762 LEE CO EC;3U 50/50 1.72 MW 1.72 MW
274763 LEE CO EC;4U 50/50 1.71 MW 1.71 MW
274764 LEE CO EC;5U 50/50 1.73 MW 1.73 MW
274765 LEE CO EC;6U 50/50 1.73 MW 1.73 MW
961011 AF2-392 C Adder 3.28 MW 2.79 MW
961012 AF2-392 E Adder 15.26 MW 12.97 MW
966822 AG1-553 E Adder 18.7 MW 15.9 MW
930481 AB1-089 C 50/50 78.03 MW 78.03 MW
930482 AB1-089 E 50/50 3.55 MW 3.55 MW
938861 AE1-114 C 50/50 4.61 MW 4.61 MW
938862 AE1-114 E 50/50 15.74 MW 15.74 MW
946152 AF1-280 E Adder 22.74 MW 19.33 MW
946321 AF1-296 C Adder 2.52 MW 2.14 MW
946322 AF1-296 E Adder 11.78 MW 10.01 MW
946671 AF1-331 C Adder 1.46 MW 1.24 MW
962691 AG1-118 C Adder 10.17 MW 8.64 MW
962692 AG1-118 E Adder 6.78 MW 5.76 MW
965931 AG1-462 C Adder 11.01 MW 9.36 MW
965932 AG1-462 E Adder 7.34 MW 6.24 MW
276626 AG1-044 E Adder 0.06 MW 0.05 MW
955972 J1084 External Queue 7.95 MW 7.95 MW
990117 J1214 G External Queue 28.89 MW 28.89 MW
990407 J1304 G External Queue 7.07 MW 7.07 MW
990512 J1326 G External Queue 7.23 MW 7.23 MW
990727 J1377 G External Queue 12.48 MW 12.48 MW
990947 J1432 C External Queue 2.03 MW 2.03 MW
990948 J1432 E External Queue 10.99 MW 10.99 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 41.78 MW 41.78 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 4.87 MW 4.87 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.04 MW 0.04 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.35 MW 0.35 MW
NY PJM->LTFIMP_NY CLTF 0.19 MW 0.19 MW
WEC LTFEXP_WEC->PJM CLTF 0.18 MW 0.18 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.03 MW 0.03 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.0 MW 0.0 MW
TVA LTFEXP_TVA->PJM CLTF 0.67 MW 0.67 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.13 MW 0.13 MW
MEC LTFEXP_MEC->PJM CLTF 7.05 MW 7.05 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.38 MW 0.38 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.65 MW 1.65 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 2.23 MW 2.23 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.06 MW 0.06 MW

Details for WATERMAN ; B-SANDWICH ; R 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
WATERMAN ; B-SANDWICH ; R 138.0 kV Ckt 1 line
272728 to 272445 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 114.95 %
Rating: 238.0 MVA
Rating Type: A
MVA to Mitigate: 273.57 MVA
MW Contribution: 78.85 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
WATERMAN ; B-SANDWICH ; R 138.0 kV Ckt 1 line
272728 to 272445 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 111.95 %
Rating: 238.0 MVA
Rating Type: A
MVA to Mitigate: 266.44 MVA
MW Contribution: 79.64 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 4.89 MW 4.89 MW
962781 AG1-127 C 50/50 15.41 MW 15.41 MW
962782 AG1-127 E 50/50 10.26 MW 10.26 MW
290051 GSG-6; E 50/50 19.16 MW 19.16 MW
295109 WESTBROOK E 50/50 10.26 MW 10.26 MW
295111 SUBLETTE E 50/50 4.99 MW 4.99 MW
933911 AD1-013 C 50/50 3.44 MW 3.44 MW
933912 AD1-013 E 50/50 5.5 MW 5.5 MW
937001 AD2-134 C 50/50 0.75 MW 0.75 MW
937002 AD2-134 E 50/50 18.52 MW 18.52 MW
960751 AF2-366 C 50/50 15.37 MW 15.37 MW
960752 AF2-366 E 50/50 10.25 MW 10.25 MW
274855 GSG-6 ;RU 50/50 0.78 MW 0.78 MW
276602 WESTBROOK C 50/50 0.25 MW 0.25 MW
276603 SUBLETTE C 50/50 0.11 MW 0.11 MW
274872 LEE DEKAL;1U 50/50 1.81 MW 1.81 MW
290108 LEEDK;1U E 50/50 54.65 MW 54.65 MW
274850 MENDOTA H;RU 50/50 0.52 MW 0.52 MW
916221 Z1-073 E 50/50 13.5 MW 13.5 MW
946671 AF1-331 C 50/50 4.47 MW 4.47 MW
962691 AG1-118 C 50/50 47.31 MW 47.31 MW
962692 AG1-118 E 50/50 31.54 MW 31.54 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 10.97 MW 10.97 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.27 MW 1.27 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.02 MW 0.02 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.09 MW 0.09 MW
NY PJM->LTFIMP_NY CLTF 0.05 MW 0.05 MW
WEC LTFEXP_WEC->PJM CLTF 0.29 MW 0.29 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.01 MW 0.01 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.0 MW 0.0 MW
TVA LTFEXP_TVA->PJM CLTF 0.17 MW 0.17 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.03 MW 0.03 MW
MEC LTFEXP_MEC->PJM CLTF 1.72 MW 1.72 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.09 MW 0.09 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.41 MW 0.41 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.56 MW 0.56 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.01 MW 0.01 MW

Details for W PLANO ; R-PLANO; R 138.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
W PLANO ; R-PLANO; R 138.0 kV Ckt 1 line
272803 to 272251 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 112.73 %
Rating: 351.0 MVA
Rating Type: A
MVA to Mitigate: 395.67 MVA
MW Contribution: 78.85 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
W PLANO ; R-PLANO; R 138.0 kV Ckt 1 line
272803 to 272251 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 110.83 %
Rating: 351.0 MVA
Rating Type: A
MVA to Mitigate: 389.0 MVA
MW Contribution: 79.64 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 4.89 MW 4.89 MW
962781 AG1-127 C 50/50 15.41 MW 15.41 MW
962782 AG1-127 E 50/50 10.26 MW 10.26 MW
290051 GSG-6; E 50/50 19.16 MW 19.16 MW
295109 WESTBROOK E 50/50 10.26 MW 10.26 MW
295111 SUBLETTE E 50/50 4.99 MW 4.99 MW
933911 AD1-013 C 50/50 3.44 MW 3.44 MW
933912 AD1-013 E 50/50 5.5 MW 5.5 MW
937001 AD2-134 C 50/50 0.75 MW 0.75 MW
937002 AD2-134 E 50/50 18.52 MW 18.52 MW
960751 AF2-366 C 50/50 15.37 MW 15.37 MW
960752 AF2-366 E 50/50 10.25 MW 10.25 MW
274855 GSG-6 ;RU 50/50 0.78 MW 0.78 MW
276602 WESTBROOK C 50/50 0.25 MW 0.25 MW
276603 SUBLETTE C 50/50 0.11 MW 0.11 MW
274872 LEE DEKAL;1U 50/50 1.81 MW 1.81 MW
290108 LEEDK;1U E 50/50 54.65 MW 54.65 MW
274850 MENDOTA H;RU 50/50 0.52 MW 0.52 MW
916221 Z1-073 E 50/50 13.5 MW 13.5 MW
943121 AE2-341 C 50/50 79.42 MW 79.42 MW
943122 AE2-341 E 50/50 39.0 MW 39.0 MW
943591 AF1-030 C 50/50 52.82 MW 52.82 MW
943592 AF1-030 E 50/50 26.13 MW 26.13 MW
946671 AF1-331 C 50/50 4.47 MW 4.47 MW
962691 AG1-118 C 50/50 47.31 MW 47.31 MW
962692 AG1-118 E 50/50 31.54 MW 31.54 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 10.97 MW 10.97 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.27 MW 1.27 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.02 MW 0.02 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.09 MW 0.09 MW
NY PJM->LTFIMP_NY CLTF 0.05 MW 0.05 MW
WEC LTFEXP_WEC->PJM CLTF 0.29 MW 0.29 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.01 MW 0.01 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.0 MW 0.0 MW
TVA LTFEXP_TVA->PJM CLTF 0.17 MW 0.17 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.03 MW 0.03 MW
MEC LTFEXP_MEC->PJM CLTF 1.72 MW 1.72 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.09 MW 0.09 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.41 MW 0.41 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.56 MW 0.56 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.01 MW 0.01 MW

Details for ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 110.02 %
Rating: 1201.0 MVA
Rating Type: A
MVA to Mitigate: 1321.35 MVA
MW Contribution: 31.09 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: CE
Facility Description:
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line
270730 to 270812 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 109.95 %
Rating: 1201.0 MVA
Rating Type: A
MVA to Mitigate: 1320.5 MVA
MW Contribution: 31.14 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.99 MW 1.7 MW
962012 AG1-044 E Adder 0.04 MW 0.03 MW
962781 AG1-127 C Adder 5.51 MW 4.68 MW
962782 AG1-127 E Adder 3.67 MW 3.12 MW
966441 AG1-513 C Adder 0.27 MW 0.23 MW
966442 AG1-513 E Adder 0.41 MW 0.35 MW
290051 GSG-6; E Adder 7.91 MW 6.72 MW
295109 WESTBROOK E Adder 4.23 MW 3.6 MW
295111 SUBLETTE E Adder 2.06 MW 1.75 MW
933911 AD1-013 C Adder 1.4 MW 1.19 MW
933912 AD1-013 E Adder 2.23 MW 1.9 MW
937002 AD2-134 E Adder 7.65 MW 6.5 MW
937312 AD2-172 E Adder 1.61 MW 1.37 MW
958912 AF2-182 E Adder 22.04 MW 18.74 MW
959081 AF2-199 C 50/50 8.79 MW 8.79 MW
959082 AF2-199 E 50/50 4.4 MW 4.4 MW
960751 AF2-366 C Adder 5.49 MW 4.67 MW
960752 AF2-366 E Adder 3.66 MW 3.11 MW
274738 AURORA EC;3P 50/50 4.34 MW 4.34 MW
274740 AURORA EC;4P 50/50 4.34 MW 4.34 MW
274859 EASYR;U1 E Adder 7.42 MW 6.31 MW
274860 EASYR;U2 E Adder 7.42 MW 6.31 MW
276591 L-013 2 Adder 2.79 MW 2.37 MW
293715 O-029 E Adder 5.54 MW 4.71 MW
293716 O-029 E Adder 3.04 MW 2.58 MW
293717 O-029 E Adder 2.79 MW 2.37 MW
294763 P-046 E Adder 4.48 MW 3.81 MW
939061 AE1-134 2 Adder 0.97 MW 0.82 MW
940502 AE2-035 E Adder 1.61 MW 1.37 MW
957471 AF2-041 C 50/50 26.38 MW 26.38 MW
957472 AF2-041 E 50/50 13.19 MW 13.19 MW
293516 O-009 E Adder 10.72 MW 9.11 MW
290108 LEEDK;1U E Adder 19.04 MW 16.19 MW
916221 Z1-073 E Adder 5.57 MW 4.74 MW
943121 AE2-341 C Adder 9.76 MW 8.3 MW
943122 AE2-341 E Adder 4.79 MW 4.07 MW
943591 AF1-030 C Adder 6.49 MW 5.52 MW
943592 AF1-030 E Adder 3.21 MW 2.73 MW
959091 AF2-200 C 50/50 17.59 MW 17.59 MW
959092 AF2-200 E 50/50 11.72 MW 11.72 MW
961011 AF2-392 C Adder 2.62 MW 2.23 MW
961012 AF2-392 E Adder 12.18 MW 10.35 MW
966822 AG1-553 E Adder 14.77 MW 12.56 MW
930481 AB1-089 C Adder 33.84 MW 28.77 MW
930482 AB1-089 E Adder 1.54 MW 1.31 MW
938861 AE1-114 C Adder 2.14 MW 1.82 MW
938862 AE1-114 E Adder 7.3 MW 6.21 MW
946152 AF1-280 E Adder 14.7 MW 12.49 MW
946321 AF1-296 C Adder 1.93 MW 1.64 MW
946322 AF1-296 E Adder 9.02 MW 7.67 MW
946671 AF1-331 C Adder 1.82 MW 1.54 MW
962691 AG1-118 C 50/50 18.65 MW 18.65 MW
962692 AG1-118 E 50/50 12.43 MW 12.43 MW
965931 AG1-462 C Adder 8.69 MW 7.39 MW
965932 AG1-462 E Adder 5.8 MW 4.93 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
955972 J1084 External Queue 7.6 MW 7.6 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 8.47 MW 8.47 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 2.52 MW 2.52 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.3 MW 0.3 MW
NY PJM->LTFIMP_NY CLTF 0.16 MW 0.16 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.06 MW 0.06 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.03 MW 0.03 MW
TVA LTFEXP_TVA->PJM CLTF 0.29 MW 0.29 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.12 MW 0.12 MW
MEC LTFEXP_MEC->PJM CLTF 3.93 MW 3.93 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.36 MW 0.36 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.82 MW 0.82 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 1.92 MW 1.92 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.1 MW 0.1 MW

Details for J1180 POI-05SULLIVAN 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: AEP/AMIL
Facility Description:
J1180 POI-05SULLIVAN 345.0 kV Ckt 1 line
956820 to 247712 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 110.12 %
Rating: 1334.0 MVA
Rating Type: A
MVA to Mitigate: 1468.99 MVA
MW Contribution: 15.26 MW
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area: AEP/AMIL
Facility Description:
J1180 POI-05SULLIVAN 345.0 kV Ckt 1 line
956820 to 247712 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 109.59 %
Rating: 1334.0 MVA
Rating Type: A
MVA to Mitigate: 1461.96 MVA
MW Contribution: 15.15 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.18 MW 1.0 MW
962012 AG1-044 E Adder 0.03 MW 0.03 MW
962781 AG1-127 C Adder 2.93 MW 2.49 MW
962782 AG1-127 E Adder 1.95 MW 1.66 MW
965091 AG1-374 C Adder 16.49 MW 14.02 MW
965092 AG1-374 E Adder 10.99 MW 9.34 MW
965911 AG1-460 C 50/50 1.64 MW 1.64 MW
965912 AG1-460 E 50/50 2.46 MW 2.46 MW
290021 O50 E Adder 9.07 MW 7.71 MW
290051 GSG-6; E Adder 4.71 MW 4.01 MW
290261 S-027 E Adder 14.95 MW 12.71 MW
290265 S-028 E Adder 14.86 MW 12.63 MW
295109 WESTBROOK E Adder 2.52 MW 2.15 MW
295111 SUBLETTE E Adder 1.23 MW 1.04 MW
918052 AA1-018 E OP Adder 6.77 MW 5.75 MW
933911 AD1-013 C Adder 0.83 MW 0.7 MW
933912 AD1-013 E Adder 1.32 MW 1.12 MW
936771 AD2-100 C 50/50 17.85 MW 17.85 MW
936772 AD2-100 E 50/50 11.9 MW 11.9 MW
936971 AD2-131 C 50/50 1.18 MW 1.18 MW
936972 AD2-131 E 50/50 5.91 MW 5.91 MW
937002 AD2-134 E Adder 4.56 MW 3.88 MW
937312 AD2-172 E Adder 1.64 MW 1.39 MW
942111 AE2-223 C Adder 1.63 MW 1.39 MW
942112 AE2-223 E Adder 10.94 MW 9.3 MW
942481 AE2-261 C 50/50 24.54 MW 24.54 MW
942482 AE2-261 E 50/50 16.36 MW 16.36 MW
942991 AE2-321 C Adder 3.49 MW 2.96 MW
942992 AE2-321 E Adder 1.72 MW 1.46 MW
958481 AF2-142 C Adder 4.67 MW 3.97 MW
958482 AF2-142 E Adder 3.11 MW 2.64 MW
958491 AF2-143 C Adder 4.99 MW 4.24 MW
958492 AF2-143 E Adder 3.33 MW 2.83 MW
958912 AF2-182 E Adder 17.77 MW 15.11 MW
959081 AF2-199 C Adder 3.29 MW 2.8 MW
959082 AF2-199 E Adder 1.65 MW 1.4 MW
959341 AF2-225 C Adder 5.28 MW 4.49 MW
959342 AF2-225 E Adder 7.29 MW 6.2 MW
959351 AF2-226 C Adder 1.03 MW 0.87 MW
959352 AF2-226 E Adder 1.54 MW 1.31 MW
959611 AF2-252 C Adder 1.83 MW 1.56 MW
959612 AF2-252 E Adder 2.75 MW 2.34 MW
960281 AF2-319 C Adder 1.03 MW 0.87 MW
960282 AF2-319 E Adder 1.54 MW 1.31 MW
960582 AF2-349 E Adder 15.88 MW 13.5 MW
960611 AF2-352 C Adder 1.83 MW 1.56 MW
960612 AF2-352 E Adder 2.75 MW 2.34 MW
960751 AF2-366 C Adder 2.92 MW 2.48 MW
960752 AF2-366 E Adder 1.95 MW 1.66 MW
274650 KINCAID ;1U 50/50 12.27 MW 12.27 MW
274651 KINCAID ;2U 50/50 12.26 MW 12.26 MW
274859 EASYR;U1 E Adder 6.14 MW 5.22 MW
274860 EASYR;U2 E Adder 6.14 MW 5.22 MW
274880 RADFORD R;1U 50/50 0.84 MW 0.84 MW
276615 W2-048 GEN 50/50 6.51 MW 6.51 MW
276621 X2-022 GEN 50/50 22.27 MW 22.27 MW
293644 O22 E1 Adder 5.89 MW 5.01 MW
293645 O22 E2 Adder 6.75 MW 5.74 MW
293715 O-029 E Adder 5.53 MW 4.7 MW
293716 O-029 E Adder 3.03 MW 2.58 MW
293717 O-029 E Adder 2.79 MW 2.37 MW
293771 O-035 E Adder 4.39 MW 3.73 MW
294401 BSHIL;1U E Adder 5.56 MW 4.72 MW
294410 BSHIL;2U E Adder 5.56 MW 4.72 MW
294763 P-046 E Adder 4.54 MW 3.86 MW
917502 Z2-087 E Adder 14.58 MW 12.39 MW
925582 AC1-033 E Adder 6.09 MW 5.18 MW
939061 AE1-134 2 Adder 0.74 MW 0.63 MW
940502 AE2-035 E Adder 1.64 MW 1.39 MW
957381 AF2-032 C 50/50 1.84 MW 1.84 MW
957382 AF2-032 E 50/50 0.86 MW 0.86 MW
957471 AF2-041 C Adder 9.88 MW 8.39 MW
957472 AF2-041 E Adder 4.94 MW 4.2 MW
274890 CAYUG;1U E Adder 7.79 MW 6.62 MW
274891 CAYUG;2U E Adder 7.79 MW 6.62 MW
925771 AC1-053 C 50/50 0.48 MW 0.48 MW
925772 AC1-053 E 50/50 20.04 MW 20.04 MW
933441 AC2-157 C Adder -19.06 MW -16.2 MW
938851 AE1-113 C Adder 3.74 MW 3.18 MW
938852 AE1-113 E Adder 13.26 MW 11.27 MW
934101 AD2-000 1 Adder 2.41 MW 2.05 MW
276174 W4-005 E 50/50 29.4 MW 29.4 MW
293516 O-009 E Adder 10.7 MW 9.1 MW
916212 CRESCENT ;1U Adder 3.08 MW 2.62 MW
924048 AB2-047 E1 Adder 9.04 MW 7.69 MW
924049 AB2-047 E2 Adder 9.18 MW 7.81 MW
927208 AC1-214 E1 Adder 2.08 MW 1.77 MW
927209 AC1-214 E2 Adder 2.08 MW 1.77 MW
957751 AF2-069 C Adder 0.14 MW 0.12 MW
957752 AF2-069 E Adder 0.44 MW 0.37 MW
990901 L-005 E Adder 8.57 MW 7.28 MW
290108 LEEDK;1U E Adder 10.24 MW 8.7 MW
916221 Z1-073 E Adder 3.32 MW 2.82 MW
276668 AB2-070 C 50/50 0.48 MW 0.48 MW
924266 AB2-070 E 50/50 17.75 MW 17.75 MW
926821 AC1-168 C Adder 0.67 MW 0.57 MW
926822 AC1-168 E Adder 4.48 MW 3.8 MW
934051 AD1-031 C Adder 1.85 MW 1.57 MW
934052 AD1-031 E Adder 3.02 MW 2.56 MW
935141 AD1-148 C 50/50 0.71 MW 0.71 MW
936292 AD2-038 E Adder 6.86 MW 5.83 MW
936511 AD2-066 C Adder 3.9 MW 3.32 MW
936512 AD2-066 E Adder 2.6 MW 2.21 MW
942421 AE2-255 C Adder 1.42 MW 1.2 MW
942422 AE2-255 E Adder 4.25 MW 3.61 MW
942651 AE2-281 C Adder 0.39 MW 0.33 MW
942652 AE2-281 E Adder 2.38 MW 2.03 MW
959091 AF2-200 C Adder 6.58 MW 5.6 MW
959092 AF2-200 E Adder 4.39 MW 3.73 MW
960141 AF2-305_AG1- 50/50 1.04 MW 1.04 MW
960261 AF2-317 C 50/50 0.3 MW 0.3 MW
961011 AF2-392 C Adder 2.13 MW 1.81 MW
961012 AF2-392 E Adder 9.9 MW 8.42 MW
966822 AG1-553 E Adder 17.41 MW 14.8 MW
930462 AB1-087 E Adder -6.27 MW -5.33 MW
930472 AB1-088 E Adder -6.27 MW -5.33 MW
930481 AB1-089 C Adder 29.83 MW 25.36 MW
930482 AB1-089 E Adder 1.36 MW 1.15 MW
938861 AE1-114 C Adder 1.96 MW 1.67 MW
938862 AE1-114 E Adder 6.7 MW 5.69 MW
939321 AE1-163 C Adder 2.72 MW 2.31 MW
939322 AE1-163 E Adder 16.69 MW 14.19 MW
939401 AE1-172 C Adder 2.66 MW 2.26 MW
939402 AE1-172 E Adder 12.44 MW 10.58 MW
939741 AE1-205 C Adder 7.04 MW 5.98 MW
939742 AE1-205 E Adder 9.72 MW 8.26 MW
946152 AF1-280 E Adder 11.85 MW 10.07 MW
946321 AF1-296 C Adder 2.22 MW 1.88 MW
946322 AF1-296 E Adder 10.37 MW 8.82 MW
946671 AF1-331 C Adder 1.07 MW 0.91 MW
962691 AG1-118 C Adder 9.15 MW 7.78 MW
962692 AG1-118 E Adder 6.1 MW 5.19 MW
963831 AG1-236 C 50/50 2.69 MW 2.69 MW
963832 AG1-236 E 50/50 18.04 MW 18.04 MW
941731 AE2-173 C Adder 4.19 MW 3.56 MW
944221 AF1-090 C 50/50 5.49 MW 5.49 MW
944222 AF1-090 E 50/50 25.72 MW 25.72 MW
965331 AG1-398 C 50/50 0.13 MW 0.13 MW
965931 AG1-462 C Adder 10.25 MW 8.71 MW
965932 AG1-462 E Adder 6.83 MW 5.81 MW
276626 AG1-044 E Adder 0.04 MW 0.04 MW
944202 AF1-088 NFTW 50/50 250.78 MW 250.78 MW
920272 AA2-123 E Adder 1.22 MW 1.04 MW
990272 J1263 G External Queue 52.7 MW 52.7 MW
991082 J1475 G External Queue 38.23 MW 38.23 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 72.06 MW 72.06 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 43.82 MW 43.82 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 12.77 MW 12.77 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.47 MW 0.47 MW
NY PJM->LTFIMP_NY CLTF 0.26 MW 0.26 MW
WEC LTFEXP_WEC->PJM CLTF 1.77 MW 1.77 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.74 MW 0.74 MW
TVA LTFEXP_TVA->PJM CLTF 6.28 MW 6.28 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.9 MW 0.9 MW
MEC LTFEXP_MEC->PJM CLTF 12.35 MW 12.35 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.39 MW 2.39 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.87 MW 9.87 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.1 MW 0.1 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.02 MW 3.02 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.34 MW 0.34 MW

Details for QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line l/o EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE/MEC
Facility Description:
QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line
270866 to 636610 ckt 1
Contingency Name:
EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S
CONTINGENCY 'EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S'
 OPEN BRANCH FROM BUS 636600 TO BUS 636605 CKT 1   /*SUB 39 3     345.0 - MEC CORDOVA3 345.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 109.0 %
Rating: 1471.0 MVA
Rating Type: B
MVA to Mitigate: 1603.34 MVA
MW Contribution: 20.46 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE/MEC
Facility Description:
QUAD 6-7-SUB 91 3 345.0 kV Ckt 1 line
270866 to 636610 ckt 1
Contingency Name:
EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S
CONTINGENCY 'EXT_636600 SUB 39 3 345 636605 MEC CORDOVA3 345 1 _SRT-S'
 OPEN BRANCH FROM BUS 636600 TO BUS 636605 CKT 1   /*SUB 39 3     345.0 - MEC CORDOVA3 345.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 109.06 %
Rating: 1471.0 MVA
Rating Type: B
MVA to Mitigate: 1604.24 MVA
MW Contribution: 20.27 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.98 MW 1.68 MW
962012 AG1-044 E Adder 0.08 MW 0.07 MW
962781 AG1-127 C Adder 4.04 MW 3.44 MW
962782 AG1-127 E Adder 2.69 MW 2.29 MW
290051 GSG-6; E Adder 7.96 MW 6.77 MW
295109 WESTBROOK E Adder 4.26 MW 3.62 MW
295111 SUBLETTE E Adder 2.07 MW 1.76 MW
933911 AD1-013 C Adder 1.38 MW 1.17 MW
933912 AD1-013 E Adder 2.2 MW 1.87 MW
937002 AD2-134 E Adder 7.7 MW 6.54 MW
937312 AD2-172 E Adder 2.82 MW 2.4 MW
942991 AE2-321 C Adder 4.47 MW 3.8 MW
942992 AE2-321 E Adder 2.2 MW 1.87 MW
958912 AF2-182 E 50/50 46.4 MW 46.4 MW
959081 AF2-199 C Adder 7.13 MW 6.06 MW
959082 AF2-199 E Adder 3.57 MW 3.03 MW
960582 AF2-349 E Adder 21.96 MW 18.67 MW
960751 AF2-366 C Adder 4.03 MW 3.43 MW
960752 AF2-366 E Adder 2.69 MW 2.29 MW
274662 QUAD CITI;1U 50/50 43.85 MW 43.85 MW
274663 QUAD CITI;2U 50/50 43.32 MW 43.32 MW
274699 CORDOVA ;1C 50/50 7.57 MW 7.57 MW
274700 CORDOVA ;2C 50/50 7.57 MW 7.57 MW
274701 CORDOVA ;1S 50/50 8.51 MW 8.51 MW
274715 NELSON EC;1C 50/50 4.87 MW 4.87 MW
274717 NELSON EC;2C 50/50 4.9 MW 4.9 MW
274859 EASYR;U1 E Adder 15.17 MW 12.9 MW
274860 EASYR;U2 E Adder 15.17 MW 12.9 MW
293715 O-029 E Adder 9.76 MW 8.3 MW
293716 O-029 E Adder 5.35 MW 4.55 MW
293717 O-029 E Adder 4.92 MW 4.18 MW
294763 P-046 E Adder 7.84 MW 6.67 MW
939051 AE1-134 1 50/50 0.35 MW 0.35 MW
939061 AE1-134 2 50/50 2.16 MW 2.16 MW
940502 AE2-035 E Adder 2.82 MW 2.4 MW
957471 AF2-041 C Adder 21.4 MW 18.19 MW
957472 AF2-041 E Adder 10.7 MW 9.1 MW
274760 LEE CO EC;1U 50/50 2.01 MW 2.01 MW
276676 AA2-030 GEN 50/50 4.54 MW 4.54 MW
276677 AA1-146 50/50 5.49 MW 5.49 MW
293516 O-009 E Adder 18.88 MW 16.05 MW
290108 LEEDK;1U E Adder 14.94 MW 12.7 MW
916221 Z1-073 E Adder 5.61 MW 4.77 MW
274761 LEE CO EC;2U 50/50 2.01 MW 2.01 MW
274762 LEE CO EC;3U 50/50 2.01 MW 2.01 MW
274763 LEE CO EC;4U 50/50 1.99 MW 1.99 MW
274764 LEE CO EC;5U 50/50 2.01 MW 2.01 MW
274765 LEE CO EC;6U 50/50 2.01 MW 2.01 MW
959091 AF2-200 C Adder 14.27 MW 12.13 MW
959092 AF2-200 E Adder 9.51 MW 8.09 MW
961011 AF2-392 C 50/50 5.19 MW 5.19 MW
961012 AF2-392 E 50/50 24.17 MW 24.17 MW
966822 AG1-553 E 50/50 75.16 MW 75.16 MW
930481 AB1-089 C Adder 48.4 MW 41.14 MW
930482 AB1-089 E Adder 2.2 MW 1.87 MW
938861 AE1-114 C Adder 3.87 MW 3.29 MW
938862 AE1-114 E Adder 13.19 MW 11.21 MW
946152 AF1-280 E 50/50 30.93 MW 30.93 MW
946321 AF1-296 C Adder 2.17 MW 1.85 MW
946322 AF1-296 E Adder 10.17 MW 8.64 MW
946671 AF1-331 C Adder 1.79 MW 1.52 MW
962691 AG1-118 C Adder 12.27 MW 10.43 MW
962692 AG1-118 E Adder 8.18 MW 6.96 MW
965931 AG1-462 C 50/50 44.23 MW 44.23 MW
965932 AG1-462 E 50/50 29.48 MW 29.48 MW
274716 NELSON EC;1S 50/50 3.55 MW 3.55 MW
274718 NELSON EC;2S 50/50 3.58 MW 3.58 MW
276626 AG1-044 E Adder 0.09 MW 0.08 MW
920272 AA2-123 E Adder 1.54 MW 1.3 MW
276170 Z1-108 E Adder 1.23 MW 1.04 MW
955972 J1084 External Queue 42.92 MW 42.92 MW
990117 J1214 G External Queue 23.53 MW 23.53 MW
990407 J1304 G External Queue 5.69 MW 5.69 MW
990512 J1326 G External Queue 5.89 MW 5.89 MW
990727 J1377 G External Queue 8.93 MW 8.93 MW
990947 J1432 C External Queue 7.9 MW 7.9 MW
990948 J1432 E External Queue 42.73 MW 42.73 MW
991092 J1477 External Queue -14.1 MW -14.1 MW
991777 J1629 G External Queue 11.71 MW 11.71 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.02 MW 1.02 MW
NY PJM->LTFIMP_NY CLTF 0.52 MW 0.52 MW
WEC LTFEXP_WEC->PJM CLTF 1.14 MW 1.14 MW
COTTONWOOD PJM->LTFIMP_COTTONWOOD CLTF 7.83 MW 7.83 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.93 MW 0.93 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.59 MW 0.59 MW
PRAIRIE PJM->LTFIMP_PRAIRIE CLTF 10.87 MW 10.87 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.68 MW 0.68 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 2.17 MW 2.17 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.51 MW 6.51 MW
MDU PJM->LTFIMP_MDU CLTF 0.5 MW 0.5 MW
LTFEXP_AC1-056 LTFEXP_AC1-056->LTFIMP_AC1-056 CLTF 3.33 MW 3.33 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.15 MW 1.15 MW

Details for AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L97104__-R_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line
930480 to 270916 ckt 1
Contingency Name:
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A'
 TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1   /*SILVER LK; R 345.0 - GARDEN PR; R 345.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 104.06 %
Rating: 2058.0 MVA
Rating Type: B
MVA to Mitigate: 2141.62 MVA
MW Contribution: 16.66 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: CE
Facility Description:
AB1-089 TP-WAYNE ; B 345.0 kV Ckt 1 line
930480 to 270916 ckt 1
Contingency Name:
COMED_P1-2_345-L97104__-R_SRT-A
CONTINGENCY 'COMED_P1-2_345-L97104__-R_SRT-A'
 TRIP BRANCH FROM BUS 270883 TO BUS 276670 CKT 1   /*SILVER LK; R 345.0 - GARDEN PR; R 345.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 104.25 %
Rating: 2058.0 MVA
Rating Type: B
MVA to Mitigate: 2145.56 MVA
MW Contribution: 16.4 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.89 MW 1.6 MW
962012 AG1-044 E Adder 0.07 MW 0.06 MW
962781 AG1-127 C Adder 4.1 MW 3.48 MW
962782 AG1-127 E Adder 2.73 MW 2.32 MW
290051 GSG-6; E Adder 7.62 MW 6.48 MW
295109 WESTBROOK E Adder 4.08 MW 3.47 MW
295111 SUBLETTE E Adder 1.98 MW 1.69 MW
933911 AD1-013 C Adder 1.32 MW 1.12 MW
933912 AD1-013 E Adder 2.1 MW 1.79 MW
937002 AD2-134 E Adder 7.37 MW 6.26 MW
937312 AD2-172 E Adder 5.74 MW 4.88 MW
942991 AE2-321 C Adder 5.91 MW 5.02 MW
942992 AE2-321 E Adder 2.91 MW 2.47 MW
958912 AF2-182 E Adder 55.88 MW 47.5 MW
959081 AF2-199 C Adder 3.78 MW 3.21 MW
959082 AF2-199 E Adder 1.89 MW 1.6 MW
960582 AF2-349 E 50/50 77.41 MW 77.41 MW
960751 AF2-366 C Adder 4.09 MW 3.47 MW
960752 AF2-366 E Adder 2.72 MW 2.32 MW
274656 BYRON ;1U 50/50 57.44 MW 57.44 MW
274657 BYRON ;2U 50/50 55.96 MW 55.96 MW
274822 ROCKFORD ;11 50/50 6.33 MW 6.33 MW
274823 ROCKFORD ;21 50/50 6.37 MW 6.37 MW
274824 ROCKFORD ;12 50/50 6.29 MW 6.29 MW
274859 EASYR;U1 E Adder 21.54 MW 18.31 MW
274860 EASYR;U2 E Adder 21.54 MW 18.31 MW
276590 R-018 50/50 0.23 MW 0.23 MW
276591 L-013 2 Adder -1.64 MW -1.4 MW
293715 O-029 E Adder 10.1 MW 8.59 MW
293716 O-029 E Adder 5.54 MW 4.71 MW
293717 O-029 E Adder 5.09 MW 4.33 MW
294401 BSHIL;1U E Adder 4.21 MW 3.58 MW
294410 BSHIL;2U E Adder 4.21 MW 3.58 MW
294763 P-046 E Adder 15.95 MW 13.56 MW
925582 AC1-033 E Adder 4.62 MW 3.93 MW
939061 AE1-134 2 Adder 1.74 MW 1.48 MW
940502 AE2-035 E Adder 5.74 MW 4.88 MW
957471 AF2-041 C Adder 11.33 MW 9.63 MW
957472 AF2-041 E Adder 5.67 MW 4.82 MW
274760 LEE CO EC;1U 50/50 2.85 MW 2.85 MW
293516 O-009 E Adder 19.54 MW 16.61 MW
290108 LEEDK;1U E Adder 13.5 MW 11.48 MW
916221 Z1-073 E Adder 5.37 MW 4.56 MW
274761 LEE CO EC;2U 50/50 2.85 MW 2.85 MW
274762 LEE CO EC;3U 50/50 2.85 MW 2.85 MW
274763 LEE CO EC;4U 50/50 2.82 MW 2.82 MW
274764 LEE CO EC;5U 50/50 2.86 MW 2.86 MW
274765 LEE CO EC;6U 50/50 2.86 MW 2.86 MW
934051 AD1-031 C Adder 1.38 MW 1.18 MW
934052 AD1-031 E Adder 2.26 MW 1.92 MW
959091 AF2-200 C Adder 7.55 MW 6.42 MW
959092 AF2-200 E Adder 5.04 MW 4.28 MW
961011 AF2-392 C Adder 4.86 MW 4.13 MW
961012 AF2-392 E Adder 22.63 MW 19.23 MW
966822 AG1-553 E Adder 29.38 MW 24.97 MW
930481 AB1-089 C 50/50 219.41 MW 219.41 MW
930482 AB1-089 E 50/50 9.97 MW 9.97 MW
938861 AE1-114 C Adder 5.9 MW 5.01 MW
938862 AE1-114 E Adder 20.13 MW 17.11 MW
946152 AF1-280 E Adder 37.25 MW 31.66 MW
946321 AF1-296 C Adder 3.88 MW 3.3 MW
946322 AF1-296 E Adder 18.15 MW 15.43 MW
946671 AF1-331 C Adder 1.71 MW 1.45 MW
962691 AG1-118 C Adder 10.0 MW 8.5 MW
962692 AG1-118 E Adder 6.67 MW 5.67 MW
965931 AG1-462 C Adder 17.29 MW 14.7 MW
965932 AG1-462 E Adder 11.53 MW 9.8 MW
276626 AG1-044 E Adder 0.09 MW 0.07 MW
920272 AA2-123 E Adder 1.75 MW 1.49 MW
955972 J1084 External Queue 12.18 MW 12.18 MW
956412 J1131 External Queue 6.41 MW 6.41 MW
990117 J1214 G External Queue 39.14 MW 39.14 MW
990407 J1304 G External Queue 9.46 MW 9.46 MW
990512 J1326 G External Queue 9.8 MW 9.8 MW
990727 J1377 G External Queue 16.39 MW 16.39 MW
990947 J1432 C External Queue 3.07 MW 3.07 MW
990948 J1432 E External Queue 16.63 MW 16.63 MW
991092 J1477 External Queue 3.21 MW 3.21 MW
991777 J1629 G External Queue 12.6 MW 12.6 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 70.44 MW 70.44 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 7.47 MW 7.47 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.57 MW 0.57 MW
NY PJM->LTFIMP_NY CLTF 0.31 MW 0.31 MW
WEC LTFEXP_WEC->PJM CLTF 1.16 MW 1.16 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.05 MW 0.05 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.01 MW 0.01 MW
TVA LTFEXP_TVA->PJM CLTF 1.01 MW 1.01 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.22 MW 0.22 MW
MEC LTFEXP_MEC->PJM CLTF 11.05 MW 11.05 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.64 MW 0.64 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.55 MW 2.55 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 3.67 MW 3.67 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.11 MW 0.11 MW

Details for AG1-118 TP-SUGAR GRV; B 138.0 kV Ckt 1 line l/o 272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: CE
Facility Description:
AG1-118 TP-SUGAR GRV; B 138.0 kV Ckt 1 line
962690 to 272522 ckt 1
Contingency Name:
272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A
CONTINGENCY '272803 W PLANO ; R138.00 943120 AE2-341 TP 138.00 1 _SRT-A'
 OPEN BRANCH FROM BUS 272803 TO BUS 943120 CKT 1   /*W PLANO  ; R 138.0 - AE2-341 TP   138.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 100.29 %
Rating: 483.0 MVA
Rating Type: B
MVA to Mitigate: 484.39 MVA
MW Contribution: 135.05 MW
Impact of Topology Modeling:
Increase
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R 50/50 6.61 MW 6.61 MW
962781 AG1-127 C 50/50 22.2 MW 22.2 MW
962782 AG1-127 E 50/50 14.78 MW 14.78 MW
290051 GSG-6; E 50/50 25.88 MW 25.88 MW
295109 WESTBROOK E 50/50 13.86 MW 13.86 MW
295111 SUBLETTE E 50/50 6.74 MW 6.74 MW
933911 AD1-013 C 50/50 4.65 MW 4.65 MW
933912 AD1-013 E 50/50 7.43 MW 7.43 MW
937001 AD2-134 C 50/50 1.01 MW 1.01 MW
937002 AD2-134 E 50/50 25.02 MW 25.02 MW
960751 AF2-366 C 50/50 22.14 MW 22.14 MW
960752 AF2-366 E 50/50 14.76 MW 14.76 MW
274855 GSG-6 ;RU 50/50 1.06 MW 1.06 MW
276602 WESTBROOK C 50/50 0.34 MW 0.34 MW
276603 SUBLETTE C 50/50 0.15 MW 0.15 MW
274872 LEE DEKAL;1U 50/50 2.45 MW 2.45 MW
290108 LEEDK;1U E 50/50 74.08 MW 74.08 MW
274850 MENDOTA H;RU 50/50 0.69 MW 0.69 MW
916221 Z1-073 E 50/50 18.24 MW 18.24 MW
943121 AE2-341 C 50/50 40.46 MW 40.46 MW
943122 AE2-341 E 50/50 19.87 MW 19.87 MW
943591 AF1-030 C 50/50 26.9 MW 26.9 MW
943592 AF1-030 E 50/50 13.31 MW 13.31 MW
938861 AE1-114 C Adder 1.85 MW 1.57 MW
938862 AE1-114 E Adder 6.31 MW 5.37 MW
946671 AF1-331 C 50/50 6.04 MW 6.04 MW
962691 AG1-118 C 50/50 81.03 MW 81.03 MW
962692 AG1-118 E 50/50 54.02 MW 54.02 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 11.77 MW 11.77 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 1.46 MW 1.46 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.14 MW 0.14 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.08 MW 0.08 MW
NY PJM->LTFIMP_NY CLTF 0.05 MW 0.05 MW
WEC LTFEXP_WEC->PJM CLTF 0.26 MW 0.26 MW
TVA LTFEXP_TVA->PJM CLTF 0.2 MW 0.2 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.03 MW 0.03 MW
MEC LTFEXP_MEC->PJM CLTF 1.93 MW 1.93 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.08 MW 0.08 MW
LAGN LTFEXP_LAGN->PJM CLTF 0.47 MW 0.47 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.0 MW 0.0 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 0.54 MW 0.54 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.01 MW 0.01 MW

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: AEP/NIPS
Facility Description:
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
Contingency Name:
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 106.9 %
Rating: 1841.0 MVA
Rating Type: B
MVA to Mitigate: 1967.95 MVA
MW Contribution: 43.43 MW
Impact of Topology Modeling:
Decrease
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 3.1 MW 2.64 MW
962781 AG1-127 C Adder 8.23 MW 7.0 MW
962782 AG1-127 E Adder 5.48 MW 4.66 MW
966091 AG1-478 C Adder 2.48 MW 2.11 MW
966092 AG1-478 E Adder 0.62 MW 0.53 MW
966431 AG1-512 C Adder 2.42 MW 2.06 MW
966432 AG1-512 E Adder 3.63 MW 3.08 MW
966441 AG1-513 C Adder 0.6 MW 0.51 MW
966442 AG1-513 E Adder 0.9 MW 0.76 MW
290021 O50 E Adder 22.73 MW 19.32 MW
290051 GSG-6; E Adder 12.35 MW 10.49 MW
295109 WESTBROOK E Adder 6.61 MW 5.62 MW
295111 SUBLETTE E Adder 3.21 MW 2.73 MW
910542 X3-005 E Adder 1.02 MW 0.87 MW
918052 AA1-018 E OP Adder 19.32 MW 16.42 MW
933911 AD1-013 C Adder 2.17 MW 1.85 MW
933912 AD1-013 E Adder 3.47 MW 2.95 MW
934722 AD1-100 E Adder 108.11 MW 91.89 MW
937002 AD2-134 E Adder 11.94 MW 10.15 MW
937312 AD2-172 E Adder 3.98 MW 3.38 MW
942991 AE2-321 C Adder 9.59 MW 8.15 MW
942992 AE2-321 E Adder 4.72 MW 4.02 MW
958481 AF2-142 C Adder 13.32 MW 11.32 MW
958482 AF2-142 E Adder 8.88 MW 7.55 MW
958491 AF2-143 C Adder 12.96 MW 11.01 MW
958492 AF2-143 E Adder 8.64 MW 7.34 MW
958912 AF2-182 E Adder 22.93 MW 19.49 MW
959081 AF2-199 C Adder 8.37 MW 7.12 MW
959082 AF2-199 E Adder 4.19 MW 3.56 MW
959351 AF2-226 C Adder 2.98 MW 2.53 MW
959352 AF2-226 E Adder 4.46 MW 3.79 MW
960281 AF2-319 C Adder 2.98 MW 2.53 MW
960282 AF2-319 E Adder 4.46 MW 3.79 MW
960582 AF2-349 E Adder 42.58 MW 36.19 MW
960751 AF2-366 C Adder 8.21 MW 6.97 MW
960752 AF2-366 E Adder 5.47 MW 4.65 MW
274675 JOLIET 29;7U Adder 85.66 MW 72.81 MW
274676 JOLIET 29;8U Adder 85.66 MW 72.81 MW
274682 WAUKEGAN ;7U Adder 48.56 MW 41.27 MW
274683 WAUKEGAN ;8U Adder 52.35 MW 44.5 MW
274687 WILL CNTY;4U Adder 80.7 MW 68.59 MW
274724 RIVER EC ;11 50/50 5.19 MW 5.19 MW
274788 SE CHICAG;5U 50/50 7.3 MW 7.3 MW
274789 SE CHICAG;6U 50/50 7.3 MW 7.3 MW
274790 SE CHICAG;7U 50/50 7.3 MW 7.3 MW
274791 SE CHICAG;8U 50/50 7.3 MW 7.3 MW
274792 SE CHICAG;9U Adder 7.21 MW 6.13 MW
274793 SE CHICAG;0U Adder 7.21 MW 6.13 MW
274794 SE CHICAG;1U 50/50 7.21 MW 7.21 MW
274795 SE CHICAG;2U 50/50 7.21 MW 7.21 MW
274859 EASYR;U1 E Adder 14.09 MW 11.98 MW
274860 EASYR;U2 E Adder 14.09 MW 11.98 MW
276591 L-013 2 Adder 4.31 MW 3.67 MW
293061 N-015 E Adder 18.01 MW 15.31 MW
293644 O22 E1 Adder 17.1 MW 14.53 MW
293645 O22 E2 Adder 19.58 MW 16.64 MW
294392 P-010 E Adder 22.88 MW 19.45 MW
294763 P-046 E Adder 11.06 MW 9.4 MW
933411 AC2-154 C Adder 3.1 MW 2.63 MW
933412 AC2-154 E Adder 5.06 MW 4.3 MW
940502 AE2-035 E Adder 3.98 MW 3.38 MW
957331 AF2-027 C Adder 2.94 MW 2.5 MW
957332 AF2-027 E Adder 4.4 MW 3.74 MW
957471 AF2-041 C Adder 25.12 MW 21.36 MW
957472 AF2-041 E Adder 12.56 MW 10.68 MW
274674 JOLIET 9 ;6U Adder 43.98 MW 37.39 MW
274890 CAYUG;1U E Adder 16.24 MW 13.8 MW
274891 CAYUG;2U E Adder 16.24 MW 13.8 MW
938851 AE1-113 C Adder 9.38 MW 7.97 MW
938852 AE1-113 E Adder 33.24 MW 28.26 MW
934101 AD2-000 1 Adder 6.8 MW 5.78 MW
934111 AD2-000 2 Adder 7.06 MW 6.0 MW
275149 KELLYCK ;1E Adder 22.84 MW 19.42 MW
293519 PILOT HIL;1E Adder 22.84 MW 19.42 MW
290108 LEEDK;1U E Adder 28.34 MW 24.09 MW
916221 Z1-073 E Adder 8.7 MW 7.39 MW
936292 AD2-038 E Adder 17.79 MW 15.12 MW
936371 AD2-047 C Adder 5.55 MW 4.72 MW
936372 AD2-047 E Adder 27.09 MW 23.02 MW
936461 AD2-060 C Adder 3.26 MW 2.77 MW
936511 AD2-066 C Adder 9.91 MW 8.43 MW
936512 AD2-066 E Adder 6.61 MW 5.62 MW
942421 AE2-255 C Adder 3.55 MW 3.02 MW
942422 AE2-255 E Adder 10.66 MW 9.06 MW
942651 AE2-281 C Adder 1.01 MW 0.86 MW
942652 AE2-281 E Adder 6.19 MW 5.26 MW
943121 AE2-341 C Adder 15.02 MW 12.77 MW
943122 AE2-341 E Adder 7.38 MW 6.27 MW
943591 AF1-030 C Adder 9.99 MW 8.49 MW
943592 AF1-030 E Adder 4.94 MW 4.2 MW
959091 AF2-200 C Adder 16.75 MW 14.24 MW
959092 AF2-200 E Adder 11.17 MW 9.49 MW
960591 AF2-350 C Adder 9.79 MW 8.32 MW
960592 AF2-350 E Adder 6.53 MW 5.55 MW
961501 AF2-441 C Adder 15.1 MW 12.83 MW
961502 AF2-441 E Adder 22.65 MW 19.25 MW
930481 AB1-089 C Adder 77.06 MW 65.5 MW
930482 AB1-089 E Adder 3.5 MW 2.98 MW
938861 AE1-114 C Adder 4.61 MW 3.92 MW
938862 AE1-114 E Adder 15.74 MW 13.38 MW
939321 AE1-163 C Adder 7.05 MW 6.0 MW
939322 AE1-163 E Adder 43.33 MW 36.83 MW
939351 AE1-166 C Adder 12.05 MW 10.24 MW
939352 AE1-166 E Adder 11.12 MW 9.45 MW
939401 AE1-172 C Adder 6.34 MW 5.38 MW
939402 AE1-172 E Adder 29.66 MW 25.21 MW
946671 AF1-331 C Adder 2.82 MW 2.4 MW
962691 AG1-118 C Adder 26.06 MW 22.15 MW
962692 AG1-118 E Adder 17.37 MW 14.77 MW
941551 AE2-152 C Adder 13.9 MW 11.81 MW
941552 AE2-152 E Adder 9.27 MW 7.88 MW
957371 AF2-031 C 50/50 1.57 MW 1.57 MW
957372 AF2-031 E 50/50 2.35 MW 2.35 MW
958011 AF2-095 C Adder 14.1 MW 11.98 MW
958012 AF2-095 E Adder 9.4 MW 7.99 MW
920272 AA2-123 E Adder 3.38 MW 2.87 MW
276170 Z1-108 E Adder 3.44 MW 2.93 MW
276675 AE2-062 E Adder 0.18 MW 0.16 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 121.3 MW 121.3 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 19.28 MW 19.28 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.44 MW 2.44 MW
NY PJM->LTFIMP_NY CLTF 1.31 MW 1.31 MW
WEC LTFEXP_WEC->PJM CLTF 4.59 MW 4.59 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.59 MW 0.59 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.31 MW 0.31 MW
TVA LTFEXP_TVA->PJM CLTF 1.8 MW 1.8 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.57 MW 0.57 MW
MEC LTFEXP_MEC->PJM CLTF 15.48 MW 15.48 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.61 MW 1.61 MW
LAGN LTFEXP_LAGN->PJM CLTF 4.42 MW 4.42 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.06 MW 0.06 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 15.67 MW 15.67 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.88 MW 0.88 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
CE/NIPS CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
Base Case OP AC 115.3 % 1091.0 A 1257.9 24.78
AEP/NIPS 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
Base Case OP AC 112.9 % 1075.0 A 1213.72 23.68
CE GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
Base Case OP AC 101.29 % 1754.0 A 1776.61 21.36

Details for CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE/NIPS
Facility Description:
CRETE EC ;BP-17STJOHN 345.0 kV Ckt 1 line
274750 to 255112 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 115.3 %
Rating: 1091.0 MVA
Rating Type: A
MVA to Mitigate: 1257.9 MVA
MW Contribution: 24.78 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.77 MW 1.5 MW
962781 AG1-127 C Adder 4.7 MW 3.99 MW
962782 AG1-127 E Adder 3.13 MW 2.66 MW
966091 AG1-478 C Adder 1.35 MW 1.15 MW
966092 AG1-478 E Adder 0.34 MW 0.29 MW
966441 AG1-513 C Adder 0.34 MW 0.29 MW
966442 AG1-513 E Adder 0.51 MW 0.44 MW
290021 O50 E Adder 13.88 MW 11.79 MW
290051 GSG-6; E Adder 7.04 MW 5.98 MW
295109 WESTBROOK E Adder 3.77 MW 3.2 MW
295111 SUBLETTE E Adder 1.83 MW 1.56 MW
918052 AA1-018 E OP Adder 10.66 MW 9.06 MW
933911 AD1-013 C Adder 1.24 MW 1.05 MW
933912 AD1-013 E Adder 1.98 MW 1.68 MW
934722 AD1-100 E Adder 60.57 MW 51.49 MW
937002 AD2-134 E Adder 6.81 MW 5.79 MW
937312 AD2-172 E Adder 2.3 MW 1.96 MW
942991 AE2-321 C Adder 5.56 MW 4.73 MW
942992 AE2-321 E Adder 2.74 MW 2.33 MW
958481 AF2-142 C Adder 7.35 MW 6.25 MW
958482 AF2-142 E Adder 4.9 MW 4.17 MW
958491 AF2-143 C Adder 7.34 MW 6.24 MW
958492 AF2-143 E Adder 4.89 MW 4.16 MW
958912 AF2-182 E Adder 23.12 MW 19.65 MW
959081 AF2-199 C Adder 4.83 MW 4.11 MW
959082 AF2-199 E Adder 2.42 MW 2.05 MW
959351 AF2-226 C 50/50 2.17 MW 2.17 MW
959352 AF2-226 E 50/50 3.25 MW 3.25 MW
960281 AF2-319 C 50/50 2.17 MW 2.17 MW
960282 AF2-319 E 50/50 3.25 MW 3.25 MW
960582 AF2-349 E Adder 24.68 MW 20.98 MW
960751 AF2-366 C Adder 4.68 MW 3.98 MW
960752 AF2-366 E Adder 3.12 MW 2.65 MW
274654 BRAIDWOOD;1U 50/50 19.28 MW 19.28 MW
274675 JOLIET 29;7U Adder 52.88 MW 44.94 MW
274676 JOLIET 29;8U Adder 52.92 MW 44.98 MW
274682 WAUKEGAN ;7U Adder 28.63 MW 24.34 MW
274683 WAUKEGAN ;8U Adder 30.86 MW 26.23 MW
274687 WILL CNTY;4U Adder 50.8 MW 43.18 MW
274752 CRETE EC ;2U 50/50 5.76 MW 5.76 MW
274753 CRETE EC ;3U 50/50 5.76 MW 5.76 MW
274754 CRETE EC ;4U 50/50 5.76 MW 5.76 MW
274859 EASYR;U1 E Adder 8.13 MW 6.91 MW
274860 EASYR;U2 E Adder 8.13 MW 6.91 MW
274861 TOP CROP ;1U 50/50 0.33 MW 0.33 MW
274862 TOP CROP ;2U 50/50 0.62 MW 0.62 MW
276591 L-013 2 Adder 2.48 MW 2.11 MW
293061 N-015 E Adder 10.66 MW 9.06 MW
293644 O22 E1 50/50 12.46 MW 12.46 MW
293645 O22 E2 50/50 14.27 MW 14.27 MW
294392 P-010 E Adder 13.54 MW 11.51 MW
294763 P-046 E Adder 6.39 MW 5.43 MW
933411 AC2-154 C Adder 1.47 MW 1.25 MW
933412 AC2-154 E Adder 2.4 MW 2.04 MW
940502 AE2-035 E Adder 2.3 MW 1.96 MW
957331 AF2-027 C Adder 1.73 MW 1.47 MW
957332 AF2-027 E Adder 2.59 MW 2.2 MW
957471 AF2-041 C Adder 14.49 MW 12.32 MW
957472 AF2-041 E Adder 7.24 MW 6.16 MW
274674 JOLIET 9 ;6U Adder 23.39 MW 19.88 MW
938851 AE1-113 C Adder 5.72 MW 4.87 MW
938852 AE1-113 E Adder 20.29 MW 17.25 MW
934101 AD2-000 1 Adder 3.84 MW 3.27 MW
934111 AD2-000 2 Adder 4.35 MW 3.7 MW
275149 KELLYCK ;1E Adder 10.82 MW 9.2 MW
293519 PILOT HIL;1E Adder 10.82 MW 9.2 MW
290108 LEEDK;1U E Adder 16.11 MW 13.69 MW
916221 Z1-073 E Adder 4.96 MW 4.22 MW
936292 AD2-038 E Adder 10.08 MW 8.57 MW
936371 AD2-047 C Adder 2.63 MW 2.23 MW
936372 AD2-047 E Adder 12.83 MW 10.9 MW
936461 AD2-060 C Adder 1.55 MW 1.31 MW
936511 AD2-066 C Adder 5.74 MW 4.88 MW
936512 AD2-066 E Adder 3.83 MW 3.25 MW
942421 AE2-255 C Adder 2.17 MW 1.84 MW
942422 AE2-255 E Adder 6.5 MW 5.53 MW
942651 AE2-281 C Adder 0.57 MW 0.48 MW
942652 AE2-281 E Adder 3.51 MW 2.98 MW
943121 AE2-341 C Adder 8.4 MW 7.14 MW
943122 AE2-341 E Adder 4.12 MW 3.5 MW
943591 AF1-030 C Adder 5.58 MW 4.75 MW
943592 AF1-030 E Adder 2.76 MW 2.35 MW
959091 AF2-200 C Adder 9.66 MW 8.21 MW
959092 AF2-200 E Adder 6.44 MW 5.47 MW
960591 AF2-350 C Adder 4.64 MW 3.94 MW
960592 AF2-350 E Adder 3.09 MW 2.63 MW
961012 AF2-392 E Adder 8.2 MW 6.97 MW
930481 AB1-089 C Adder 44.53 MW 37.85 MW
930482 AB1-089 E Adder 2.02 MW 1.72 MW
938861 AE1-114 C Adder 2.66 MW 2.26 MW
938862 AE1-114 E Adder 9.08 MW 7.72 MW
939321 AE1-163 C Adder 4.0 MW 3.4 MW
939322 AE1-163 E Adder 24.55 MW 20.87 MW
939351 AE1-166 C Adder 6.75 MW 5.74 MW
939352 AE1-166 E Adder 6.23 MW 5.3 MW
939401 AE1-172 C Adder 3.51 MW 2.98 MW
939402 AE1-172 E Adder 16.43 MW 13.97 MW
946152 AF1-280 E Adder 15.41 MW 13.1 MW
946671 AF1-331 C Adder 1.61 MW 1.37 MW
962691 AG1-118 C Adder 14.87 MW 12.64 MW
962692 AG1-118 E Adder 9.91 MW 8.43 MW
941551 AE2-152 C Adder 7.79 MW 6.62 MW
941552 AE2-152 E Adder 5.19 MW 4.41 MW
958011 AF2-095 C Adder 6.68 MW 5.67 MW
958012 AF2-095 E Adder 4.45 MW 3.78 MW
274751 CRETE EC ;1U 50/50 5.76 MW 5.76 MW
276170 Z1-108 E Adder 2.0 MW 1.7 MW
920272 AA2-123 E Adder 1.96 MW 1.67 MW
276675 AE2-062 E Adder 0.1 MW 0.09 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 49.81 MW 49.81 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 8.36 MW 8.36 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.44 MW 1.44 MW
NY PJM->LTFIMP_NY CLTF 0.77 MW 0.77 MW
WEC LTFEXP_WEC->PJM CLTF 2.69 MW 2.69 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.39 MW 0.39 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.21 MW 0.21 MW
TVA LTFEXP_TVA->PJM CLTF 0.66 MW 0.66 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.5 MW 0.5 MW
MEC LTFEXP_MEC->PJM CLTF 8.73 MW 8.73 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.49 MW 1.49 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.09 MW 2.09 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 9.23 MW 9.23 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.57 MW 0.57 MW

Details for 17STILLWELL-05DUMONT 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/NIPS
Facility Description:
17STILLWELL-05DUMONT 345.0 kV Ckt 1 line
255113 to 243219 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 112.9 %
Rating: 1075.0 MVA
Rating Type: A
MVA to Mitigate: 1213.72 MVA
MW Contribution: 23.68 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.7 MW 1.44 MW
962781 AG1-127 C Adder 4.49 MW 3.82 MW
962782 AG1-127 E Adder 2.99 MW 2.54 MW
966091 AG1-478 C Adder 1.47 MW 1.25 MW
966092 AG1-478 E Adder 0.37 MW 0.31 MW
966431 AG1-512 C Adder 1.23 MW 1.05 MW
966432 AG1-512 E Adder 1.85 MW 1.57 MW
966441 AG1-513 C Adder 0.33 MW 0.28 MW
966442 AG1-513 E Adder 0.49 MW 0.42 MW
290021 O50 E Adder 13.16 MW 11.18 MW
290051 GSG-6; E Adder 6.75 MW 5.74 MW
295109 WESTBROOK E Adder 3.61 MW 3.07 MW
295111 SUBLETTE E Adder 1.76 MW 1.49 MW
910542 X3-005 E Adder 0.71 MW 0.61 MW
918052 AA1-018 E OP Adder 11.35 MW 9.65 MW
933911 AD1-013 C Adder 1.19 MW 1.01 MW
933912 AD1-013 E Adder 1.9 MW 1.61 MW
934722 AD1-100 E Adder 60.78 MW 51.66 MW
937002 AD2-134 E Adder 6.52 MW 5.55 MW
937312 AD2-172 E Adder 2.21 MW 1.88 MW
942991 AE2-321 C Adder 5.31 MW 4.52 MW
942992 AE2-321 E Adder 2.62 MW 2.23 MW
958481 AF2-142 C Adder 7.83 MW 6.65 MW
958482 AF2-142 E Adder 5.22 MW 4.43 MW
958491 AF2-143 C Adder 7.58 MW 6.45 MW
958492 AF2-143 E Adder 5.06 MW 4.3 MW
958912 AF2-182 E Adder 12.74 MW 10.83 MW
959081 AF2-199 C Adder 4.61 MW 3.92 MW
959082 AF2-199 E Adder 2.31 MW 1.96 MW
959351 AF2-226 C Adder 1.81 MW 1.53 MW
959352 AF2-226 E Adder 2.71 MW 2.3 MW
960281 AF2-319 C Adder 1.81 MW 1.53 MW
960282 AF2-319 E Adder 2.71 MW 2.3 MW
960582 AF2-349 E Adder 23.6 MW 20.06 MW
960751 AF2-366 C Adder 4.48 MW 3.81 MW
960752 AF2-366 E Adder 2.98 MW 2.54 MW
274675 JOLIET 29;7U Adder 49.94 MW 42.45 MW
274676 JOLIET 29;8U Adder 49.95 MW 42.46 MW
274682 WAUKEGAN ;7U Adder 27.29 MW 23.2 MW
274683 WAUKEGAN ;8U Adder 29.42 MW 25.01 MW
274687 WILL CNTY;4U Adder 48.59 MW 41.3 MW
274724 RIVER EC ;11 50/50 3.9 MW 3.9 MW
274788 SE CHICAG;5U 50/50 5.54 MW 5.54 MW
274789 SE CHICAG;6U 50/50 5.54 MW 5.54 MW
274790 SE CHICAG;7U 50/50 5.54 MW 5.54 MW
274791 SE CHICAG;8U 50/50 5.54 MW 5.54 MW
274792 SE CHICAG;9U Adder 5.46 MW 4.64 MW
274793 SE CHICAG;0U Adder 5.46 MW 4.64 MW
274794 SE CHICAG;1U 50/50 5.46 MW 5.46 MW
274795 SE CHICAG;2U 50/50 5.46 MW 5.46 MW
274859 EASYR;U1 E Adder 7.82 MW 6.65 MW
274860 EASYR;U2 E Adder 7.82 MW 6.65 MW
276591 L-013 2 Adder 2.36 MW 2.01 MW
293061 N-015 E Adder 9.83 MW 8.36 MW
293644 O22 E1 Adder 10.38 MW 8.82 MW
293645 O22 E2 Adder 11.89 MW 10.1 MW
294392 P-010 E Adder 12.48 MW 10.61 MW
294763 P-046 E Adder 6.14 MW 5.22 MW
933411 AC2-154 C Adder 1.9 MW 1.61 MW
933412 AC2-154 E Adder 3.1 MW 2.63 MW
940502 AE2-035 E Adder 2.21 MW 1.88 MW
957331 AF2-027 C Adder 1.65 MW 1.4 MW
957332 AF2-027 E Adder 2.47 MW 2.1 MW
957471 AF2-041 C Adder 13.84 MW 11.77 MW
957472 AF2-041 E Adder 6.92 MW 5.88 MW
274674 JOLIET 9 ;6U Adder 25.73 MW 21.87 MW
274890 CAYUG;1U E Adder 9.1 MW 7.74 MW
274891 CAYUG;2U E Adder 9.1 MW 7.74 MW
938851 AE1-113 C Adder 5.43 MW 4.61 MW
938852 AE1-113 E Adder 19.24 MW 16.35 MW
934101 AD2-000 1 Adder 3.69 MW 3.14 MW
934111 AD2-000 2 Adder 4.08 MW 3.47 MW
275149 KELLYCK ;1E Adder 14.0 MW 11.9 MW
293519 PILOT HIL;1E Adder 14.0 MW 11.9 MW
290108 LEEDK;1U E Adder 15.41 MW 13.1 MW
916221 Z1-073 E Adder 4.76 MW 4.04 MW
936292 AD2-038 E Adder 10.42 MW 8.85 MW
936371 AD2-047 C Adder 3.4 MW 2.89 MW
936372 AD2-047 E Adder 16.6 MW 14.11 MW
936461 AD2-060 C Adder 2.0 MW 1.7 MW
936511 AD2-066 C Adder 5.68 MW 4.83 MW
936512 AD2-066 E Adder 3.79 MW 3.22 MW
942421 AE2-255 C Adder 2.06 MW 1.75 MW
942422 AE2-255 E Adder 6.17 MW 5.24 MW
942651 AE2-281 C Adder 0.59 MW 0.5 MW
942652 AE2-281 E Adder 3.62 MW 3.08 MW
943121 AE2-341 C Adder 8.0 MW 6.8 MW
943122 AE2-341 E Adder 3.93 MW 3.34 MW
943591 AF1-030 C Adder 5.32 MW 4.52 MW
943592 AF1-030 E Adder 2.63 MW 2.24 MW
959091 AF2-200 C Adder 9.23 MW 7.84 MW
959092 AF2-200 E Adder 6.15 MW 5.23 MW
960591 AF2-350 C Adder 6.0 MW 5.1 MW
960592 AF2-350 E Adder 4.0 MW 3.4 MW
961501 AF2-441 C Adder 10.92 MW 9.28 MW
961502 AF2-441 E Adder 16.37 MW 13.92 MW
930481 AB1-089 C Adder 42.63 MW 36.23 MW
930482 AB1-089 E Adder 1.94 MW 1.65 MW
938861 AE1-114 C Adder 2.56 MW 2.18 MW
938862 AE1-114 E Adder 8.73 MW 7.42 MW
939321 AE1-163 C Adder 4.13 MW 3.51 MW
939322 AE1-163 E Adder 25.37 MW 21.56 MW
939351 AE1-166 C Adder 6.77 MW 5.76 MW
939352 AE1-166 E Adder 6.25 MW 5.31 MW
939401 AE1-172 C Adder 3.55 MW 3.02 MW
939402 AE1-172 E Adder 16.63 MW 14.14 MW
946671 AF1-331 C Adder 1.54 MW 1.31 MW
962691 AG1-118 C Adder 14.21 MW 12.08 MW
962692 AG1-118 E Adder 9.47 MW 8.05 MW
941551 AE2-152 C Adder 7.81 MW 6.64 MW
941552 AE2-152 E Adder 5.21 MW 4.43 MW
957371 AF2-031 C 50/50 1.18 MW 1.18 MW
957372 AF2-031 E 50/50 1.77 MW 1.77 MW
958011 AF2-095 C Adder 8.64 MW 7.34 MW
958012 AF2-095 E Adder 5.76 MW 4.9 MW
276170 Z1-108 E Adder 1.91 MW 1.62 MW
920272 AA2-123 E Adder 1.87 MW 1.59 MW
276675 AE2-062 E Adder 0.11 MW 0.09 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 75.74 MW 75.74 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.86 MW 11.86 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.39 MW 1.39 MW
NY PJM->LTFIMP_NY CLTF 0.75 MW 0.75 MW
WEC LTFEXP_WEC->PJM CLTF 2.58 MW 2.58 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.3 MW 0.3 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.15 MW 0.15 MW
TVA LTFEXP_TVA->PJM CLTF 1.17 MW 1.17 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.23 MW 0.23 MW
MEC LTFEXP_MEC->PJM CLTF 8.77 MW 8.77 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.61 MW 0.61 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.68 MW 2.68 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.05 MW 0.05 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 8.9 MW 8.9 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.45 MW 0.45 MW

Details for GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line l/o Base Case


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
GOODINGS ;4B-GOODINGS ;3B 345.0 kV Ckt 1 line
270770 to 270766 ckt 1
Contingency Name:
Base Case
Contingency Type: OP
DC|AC: AC
Final Cycle Loading: 101.29 %
Rating: 1754.0 MVA
Rating Type: A
MVA to Mitigate: 1776.61 MVA
MW Contribution: 21.36 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 1.58 MW 1.34 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
962781 AG1-127 C Adder 4.06 MW 3.45 MW
962782 AG1-127 E Adder 2.7 MW 2.3 MW
966091 AG1-478 C Adder 0.94 MW 0.8 MW
966092 AG1-478 E Adder 0.24 MW 0.2 MW
966441 AG1-513 C Adder 0.29 MW 0.25 MW
966442 AG1-513 E Adder 0.44 MW 0.37 MW
290021 O50 E Adder 19.76 MW 16.8 MW
290051 GSG-6; E Adder 6.28 MW 5.33 MW
295109 WESTBROOK E Adder 3.36 MW 2.86 MW
295111 SUBLETTE E Adder 1.63 MW 1.39 MW
933911 AD1-013 C Adder 1.1 MW 0.94 MW
933912 AD1-013 E Adder 1.76 MW 1.5 MW
937002 AD2-134 E Adder 6.07 MW 5.16 MW
937312 AD2-172 E Adder 2.19 MW 1.86 MW
937401 AD2-194 1 50/50 1.39 MW 1.39 MW
937411 AD2-194 2 50/50 1.41 MW 1.41 MW
942991 AE2-321 C Adder 5.26 MW 4.47 MW
942992 AE2-321 E Adder 2.59 MW 2.2 MW
958491 AF2-143 C Adder 5.72 MW 4.87 MW
958492 AF2-143 E Adder 3.82 MW 3.24 MW
958912 AF2-182 E Adder 22.33 MW 18.98 MW
959081 AF2-199 C Adder 4.61 MW 3.92 MW
959082 AF2-199 E Adder 2.3 MW 1.96 MW
959351 AF2-226 C 50/50 5.74 MW 5.74 MW
959352 AF2-226 E 50/50 8.6 MW 8.6 MW
960281 AF2-319 C 50/50 5.74 MW 5.74 MW
960282 AF2-319 E 50/50 8.6 MW 8.6 MW
960582 AF2-349 E Adder 23.41 MW 19.9 MW
960751 AF2-366 C Adder 4.05 MW 3.44 MW
960752 AF2-366 E Adder 2.7 MW 2.29 MW
274675 JOLIET 29;7U Adder 67.8 MW 57.63 MW
274676 JOLIET 29;8U Adder 68.21 MW 57.98 MW
274682 WAUKEGAN ;7U Adder 28.24 MW 24.0 MW
274683 WAUKEGAN ;8U Adder 30.37 MW 25.82 MW
274728 ELWOOD EC;5P 50/50 3.61 MW 3.61 MW
274729 ELWOOD EC;1P 50/50 3.56 MW 3.56 MW
274730 ELWOOD EC;6P 50/50 3.61 MW 3.61 MW
274731 ELWOOD EC;2P 50/50 3.56 MW 3.56 MW
274732 ELWOOD EC;7P 50/50 3.61 MW 3.61 MW
274733 ELWOOD EC;3P 50/50 3.56 MW 3.56 MW
274734 ELWOOD EC;8P 50/50 3.61 MW 3.61 MW
274736 ELWOOD EC;9P 50/50 3.61 MW 3.61 MW
274859 EASYR;U1 E Adder 7.83 MW 6.66 MW
274860 EASYR;U2 E Adder 7.83 MW 6.66 MW
274861 TOP CROP ;1U 50/50 0.86 MW 0.86 MW
274862 TOP CROP ;2U 50/50 1.64 MW 1.64 MW
276591 L-013 2 Adder 2.21 MW 1.88 MW
293644 O22 E1 50/50 32.95 MW 32.95 MW
293645 O22 E2 50/50 37.74 MW 37.74 MW
293715 O-029 E Adder 6.39 MW 5.43 MW
293716 O-029 E Adder 3.5 MW 2.98 MW
293717 O-029 E Adder 3.22 MW 2.74 MW
293771 O-035 E Adder 4.36 MW 3.71 MW
294401 BSHIL;1U E Adder 5.69 MW 4.84 MW
294410 BSHIL;2U E Adder 5.69 MW 4.84 MW
294763 P-046 E Adder 6.09 MW 5.18 MW
925582 AC1-033 E Adder 6.24 MW 5.3 MW
939061 AE1-134 2 Adder 0.9 MW 0.76 MW
940502 AE2-035 E Adder 2.19 MW 1.86 MW
957331 AF2-027 C Adder 1.7 MW 1.44 MW
957332 AF2-027 E Adder 2.54 MW 2.16 MW
957471 AF2-041 C Adder 13.82 MW 11.75 MW
957472 AF2-041 E Adder 6.91 MW 5.87 MW
938851 AE1-113 C Adder 8.15 MW 6.93 MW
938852 AE1-113 E Adder 28.9 MW 24.57 MW
934101 AD2-000 1 Adder 4.19 MW 3.56 MW
934111 AD2-000 2 Adder 6.27 MW 5.33 MW
274704 KENDALL ;1C 50/50 4.57 MW 4.57 MW
274705 KENDALL ;1S 50/50 3.06 MW 3.06 MW
274706 KENDALL ;2C 50/50 4.57 MW 4.57 MW
274707 KENDALL ;2S 50/50 3.06 MW 3.06 MW
276640 AC1-204 GEN1 50/50 13.26 MW 13.26 MW
276642 AC1-204 GEN2 50/50 13.44 MW 13.44 MW
293516 O-009 E Adder 12.35 MW 10.5 MW
916212 CRESCENT ;1U Adder 3.06 MW 2.6 MW
927208 AC1-214 E1 Adder 2.07 MW 1.76 MW
927209 AC1-214 E2 Adder 2.07 MW 1.76 MW
957751 AF2-069 C Adder 0.14 MW 0.12 MW
957752 AF2-069 E Adder 0.44 MW 0.37 MW
990901 L-005 E Adder 8.66 MW 7.36 MW
290108 LEEDK;1U E Adder 14.01 MW 11.91 MW
916221 Z1-073 E Adder 4.42 MW 3.76 MW
926821 AC1-168 C Adder 0.59 MW 0.5 MW
926822 AC1-168 E Adder 3.94 MW 3.35 MW
934051 AD1-031 C Adder 1.9 MW 1.62 MW
934052 AD1-031 E Adder 3.1 MW 2.64 MW
936292 AD2-038 E Adder 7.86 MW 6.68 MW
936511 AD2-066 C Adder 5.48 MW 4.66 MW
936512 AD2-066 E Adder 3.65 MW 3.1 MW
942421 AE2-255 C Adder 3.09 MW 2.62 MW
942422 AE2-255 E Adder 9.26 MW 7.87 MW
942651 AE2-281 C Adder 0.44 MW 0.38 MW
942652 AE2-281 E Adder 2.74 MW 2.33 MW
943121 AE2-341 C Adder 6.2 MW 5.27 MW
943122 AE2-341 E Adder 3.04 MW 2.59 MW
943591 AF1-030 C Adder 4.12 MW 3.5 MW
943592 AF1-030 E Adder 2.04 MW 1.73 MW
959091 AF2-200 C Adder 9.21 MW 7.83 MW
959092 AF2-200 E Adder 6.14 MW 5.22 MW
961011 AF2-392 C Adder 2.59 MW 2.2 MW
961012 AF2-392 E Adder 12.03 MW 10.23 MW
966822 AG1-553 E Adder 18.41 MW 15.65 MW
930481 AB1-089 C Adder 42.16 MW 35.84 MW
930482 AB1-089 E Adder 1.92 MW 1.63 MW
938861 AE1-114 C Adder 2.54 MW 2.16 MW
938862 AE1-114 E Adder 8.67 MW 7.37 MW
939321 AE1-163 C Adder 3.12 MW 2.65 MW
939322 AE1-163 E Adder 19.14 MW 16.27 MW
946152 AF1-280 E Adder 14.88 MW 12.65 MW
946321 AF1-296 C Adder 2.38 MW 2.03 MW
946322 AF1-296 E Adder 11.16 MW 9.48 MW
946671 AF1-331 C Adder 1.43 MW 1.22 MW
962691 AG1-118 C Adder 12.81 MW 10.89 MW
962692 AG1-118 E Adder 8.54 MW 7.26 MW
965931 AG1-462 C Adder 10.83 MW 9.21 MW
965932 AG1-462 E Adder 7.22 MW 6.14 MW
276170 Z1-108 E Adder 1.89 MW 1.61 MW
920272 AA2-123 E Adder 1.85 MW 1.57 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
954983 J974 C External Queue 2.43 MW 2.43 MW
954984 J974 E External Queue 13.15 MW 13.15 MW
990547 J1333 G External Queue -19.15 MW -19.15 MW
990552 J1334 G External Queue -19.15 MW -19.15 MW
990557 J1335 G External Queue -19.15 MW -19.15 MW
990562 J1336 G External Queue -19.15 MW -19.15 MW
990577 J1339 External Queue -23.67 MW -23.67 MW
990582 J1340 External Queue -23.67 MW -23.67 MW
990647 J1355 External Queue -7.94 MW -7.94 MW
990662 J1358 External Queue -9.29 MW -9.29 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 54.57 MW 54.57 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 9.12 MW 9.12 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 0.96 MW 0.96 MW
NY PJM->LTFIMP_NY CLTF 0.52 MW 0.52 MW
WEC LTFEXP_WEC->PJM CLTF 2.64 MW 2.64 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.18 MW 0.18 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.09 MW 0.09 MW
TVA LTFEXP_TVA->PJM CLTF 0.98 MW 0.98 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.31 MW 0.31 MW
MEC LTFEXP_MEC->PJM CLTF 8.85 MW 8.85 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 0.89 MW 0.89 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.43 MW 2.43 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 6.18 MW 6.18 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.29 MW 0.29 MW

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Light Load Analysis

Light Load Analysis is Not Required.

Light Load Potential Congestion due to Local Energy Deliverability

Light Load Analysis is Not Required.

Short Circuit Analysis

The Phase III Short circuit analysis was conducted for the following two study scenarios:

 

  • Scenario 1 - TC1 Project Impacts;
  • Scenario 2 - TC1 Topology-Changing Upgrade Impacts;

 

The starting TC1 Phase III short circuit case is an updated Phase II case that accounted for the DPII outcomes (project changes & withdrawals) and other pre-TC1 changes. The starting Phase III case was utilized for the Scenario 1 studies to determine the impact of TC1 projects without modeling any topology-changing upgrades required for TC1. To conduct the Scenario 2 studies, the required topology-changing upgrades from the latest Load Flow & Stability studies were incorporated into the Scenario 1 case and utilized for the Scenario 2 studies to determine the impact of the topology-changing upgrades on the short circuit results from Scenario 1. The result is detailed in the following table:

Short Circuit Analysis

 

 

 

 

 

 

 

Bus Name

Breaker

Interrupting Capability (Amps)

Duty Percent TC1 Phase 3 - Scenario 2 Topology Upgrades (%)

Duty Percent TC1 Phase 3 - Scenario 2 No Topology Upgrades (%)

Duty Percent Difference (%)

Reinforcement

Projected In Service Date (ISD)

GOODING 345 kV

270769

57267

100.77%

98.71%

2.06%

s3011

12/31/2028

 

 

Stability Analysis

Analysis Complete - No Issues

Executive Summary:

New Service Requests (projects) in PJM Transition Cycle 1, Cluster 01 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 01 projects.

This analysis is effectively a screening study to determine whether the addition of the cluster 01 projects will meet the dynamics requirements of the NERC, ComEd and PJM reliability standards.

The load flow scenario for the analysis was based on the RTEP 2027 summer peak load case, modified to include applicable projects. Cluster 01 projects have been dispatched online at maximum power output, with 1.0 voltage at the terminal bus.

Cluster 01 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. Steady-state condition and 140 contingencies were studied, each with a 20 second simulation time period. Studied faults included:

  1. Steady-state operation (20 second run);
  2. Three-phase faults with normal clearing time;
  3. Three-phase bus faults with normal clearing time;
  4. Three-phase faults with three-phase delayed clearing due to a stuck breaker (GO breakers with FD Logic);
  5. Three-phase faults placed at 80% of the line with delayed (Zone 2) clearing at line end remote from the fault due to primary communications/relay failure;
  6. Three-phase faults with loss of multiple-circuit tower line.

No relevant high-speed reclosing (HSR) contingencies nor single-phase bus faults were identified for this study.

For all simulations, the queue project under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance.

In the original 2027SP base case, it was found that the system becomes unstable for contingencies P1.13, P4.24, P4.29, P5.06, P5.08 and P7.03 since the units in the City of Rochelle and Mendota areas are connected to the bulk power system just through a single branch, McGirr – Dixon, during post-fault configuration. As such, it appears that local voltage collapse occurs in the weak network conditions during post-fault period. Plots from the dynamic simulations for these simulations are provided in Attachment 4.

To mitigate the instability issue, ESS H440 generating unit was turned off, and LEED (Q57), Mendota Hills (AD1-067) and AD1-013 generating units were dispatched at a reduced capacity in “Alternate Base Case” folder to satisfy the Short Term Emergency (STE) ratings of Haumesser – W. Dekalb 138 kV and McGirr Rd – Dixon 138 kV circuits, and thus secure the case for N-0 and N-1 conditions for unstable contingencies.

For all of the fault contingencies tested on the 2027 peak load case:

  1. Cluster 01 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),
  2. The system with Cluster 01 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.
  3. Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus).
  4. No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

Cluster 01 projects meet the 0.95 leading and lagging PF requirement.

The IPCMD and IQCMD states in the REGCAU model of AE2-341 GEN, AF1-030 GEN, AG1-118 GEN1, AG1-118 GEN2 and AG1-127 GEN showed erratic behavior for some contingencies in which these generators have been disconnected as part of the contingency event. Since the machine is disconnected and no active or reactive power is injected into the system, this behavior is likely fictitious and a limitation of the software. This does not cause instability in the system.

Fictitious frequency response at AE2-341 generator bus tripped the queue project due to the action of instantaneous under frequency relays when faults were applied to AF1-030/AE2-341 POI. This issue is mitigated by increasing the relay pickup time for frequency relay instance 94312513 to 20 seconds to avoid fictitious frequency tripping of the unit.

Fictitious frequency response at the AF1-030 generator bus tripped the queue project due to the action of instantaneous over frequency and under frequency relays when faults were applied to AF1-030/AE2-341 POI. This issue is mitigated by increasing the relay pickup time for frequency relay instances 94359509 and 94359511 to 20 seconds to avoid fictitious frequency tripping of the units.

AF1-030 unit tripped due to an overvoltage spike following fault clearing. This was mitigated by adding a small pick-up time of 0.113 seconds to the relay instance 94359501 to resolve the overvoltage tripping.

The AC1-110 unit tripped by angle deviation relays for 3 contingencies (P4.48.3B3, P4.50.3B3 and P4.52.3B3). The AC1-111 unit tripped by angle deviation relays for 4 contingencies (P4.39.3B3, P4.44.3B3, P4.45.3B3 and P4.46.3B3). These tripping events were observed in previous stability analysis studies for AC1-109/110/111 and AF2-363/366 and therefore are not attributed to Cluster 01 stability analysis.

The DVR (Dynamic Voltage Recovery) criteria have been violated under several contingencies due to instability and unit tripping, particularly at the Mendota location, as observed in events P1.13, P4.24, P4.29, P5.06, P5.08, and P7.03. These contingencies have been simulated with reduced dispatch for several units and no DVR violation has been observed. Additional DVR violations occurred under contingencies P4.48.3B3, P4.50.3B3, and P4.52.3B3, where the tripping of the AC1-110 unit led to angle deviations. Notably, DVR violations identified at the AC1-110 generator bus terminals during contingencies P4.42.3B3 and P4.43.3B3 were not mitigated, as generation buses and points-of-interconnection (Aurora) are not valid monitoring points for assessing DVR compliance. Similarly, violations at the Aurora and Batavia buses (P4.42.3B3 and P4.53.3B3) were not addressed, given that the DVR recovery envelope was breached at only two buses per contingency—below the threshold of ten or more applicable buses required for mitigation to be considered.

No mitigations were found to be required.

Table 1: TC1 Cluster 01 Projects

Project

Fuel Type

Transmission Owner

MFO

Point of Interconnection

AE2-341

Solar

ComEd

150

Sandwich – Plano 138 kV circuit 14609

AF1-030

Solar

ComEd

100

Sandwich – Plano 138 kV circuit 14609

AG1-118

Solar

ComEd

300

Sugar Grove – Waterman 138 kV circuit 11106

AG1-127

Solar

ComEd

95.1

Crego Road 138 kV station

 

 

 

Reactive Power Analysis

The reactive power capability of AG1-118 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project ID Project Name Status
AA1-018 Powerton-Goodings Grove In Service
AA1-146 Nelson In Service
AA2-030 Nelson In Service
AA2-123 Marengo 34kV In Service
AB1-087 Sullivan 345kV #1 Under Construction
AB1-088 Sullivan 345kV #2 Engineering & Procurement
AB1-089 Byron-Wayne 345kV #1 Withdrawn
AB2-047 Brokaw-Pontiac Midpoint In Service
AB2-070 Mt. Pulaski-Brokaw In Service
AC1-033 Kewanee 138 kV In Service
AC1-053 Lanesville-Brokaw Under Construction
AC1-168 Kewanee-Streator Suspended
AC1-214 Crescent Ridge In Service
AC2-154 Davis Creek 138kV Engineering & Procurement
AC2-157 Sullivan 345 kV Under Construction
AD1-013 Twombly Road 138kV Engineering & Procurement
AD1-031 Kewanee - E.D. Edwards 138 kV Withdrawn
AD1-100 Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV Under Construction
AD1-148 Brokaw-Lanesville In Service
AD2-038 Powerton-Nevada 345 kV Under Construction
AD2-047 Davis Creek 138 kV Suspended
AD2-060 Davis Creek 138kV Engineering & Procurement
AD2-066 Mazon-Crescent Ridge 138 kV Engineering & Procurement
AD2-100 Kincaid-Pana 345 kV Suspended
AD2-131 Kincaid-Pana 345kV Suspended
AD2-134 Shady Oaks Partially in Service - Under Construction
AD2-172 Lena 138kV In Service
AE1-113 Mole Creek 345 kV Engineering & Procurement
AE1-114 Maryland-Lancaster 138 kV Active
AE1-134 Nelson 345 kV In Service
AE1-163 Powerton-Nevada 345 kV Engineering & Procurement
AE1-166 Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV Engineering & Procurement
AE1-172 Loretto-Wilton Center Active
AE1-205 McLean 345 kV Engineering & Procurement
AE2-035 Lena 138 kV In Service
AE2-152 Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kV Engineering & Procurement
AE2-173 McLean 345 kV Active
AE2-223 McLean 345 kV Active
AE2-255 Molecreek 345 kV Engineering & Procurement
AE2-261 Kincaid-Pana 345 kV Active
AE2-281 Powerton-Nevada 345 kV Engineering & Procurement
AE2-321 Belvidere-Marengo 138 kV Active
AE2-341 Sandwich-Plano 138 kV Active
AF1-030 Sandwich-Plano 138 kV Active
AF1-088 Sullivan 345 kV Active
AF1-090 Kincaid-Pana Engineering & Procurement
AF1-280 Nelson-Lee County Active
AF1-296 Garden Plain 138 kV Active
AF1-331 Twombley Road Engineering & Procurement
AF2-032 Kincaid 345 kV Engineering & Procurement
AF2-041 Nelson-Electric Junction 345 kV Active
AF2-069 Crescent Ridge 138 kV Active
AF2-095 Davis Creek 138 kV Active
AF2-142 Nevada 345 kV Active
AF2-143 Powerton-Nevada 345 kV Active
AF2-182 Nelson-Lee County 345 kV II Active
AF2-199 Nelson-Electric Junction 345 kV Active
AF2-200 Nelson-Electric Junction 345 kV Active
AF2-225 McLean 345 kV Active
AF2-226 Katydid Road 345 kV Active
AF2-252 Blue Mound 345 kV Engineering & Procurement
AF2-305 Brokaw-Lanesville 345 kV In Service
AF2-317 Hill Topper 345 kV In Service
AF2-319 Katydid Road 345 kV Active
AF2-349 SILVER LAKE- CHERRY VALLEY 345 KV Active
AF2-350 Kensington 138 kV Active
AF2-352 Blue Mound 345 kV Engineering & Procurement
AF2-366 Crego Rd 138 kV Engineering & Procurement
AF2-392 Nelson-Dixon 138 kV Active
AG1-044 Whiteside County In Service
AG1-127 Crego Rd 138 kV Active
AG1-236 Lanesville-Brokaw 345 kV Active
AG1-374 Blue Mound 345 kV Active
AG1-398 Brokaw-Lanesville 345 kV In Service
AG1-460 Kincaid-Pana 345 kV Active
AG1-462 Cordova 345 kV Active
AG1-478 Wilmington 34.5 kV Engineering & Procurement
AG1-513 Aurora 138 kV Suspended
AG1-553 Cordova 345 kV Active
W2-048 Brokaw-Lanesville In Service
W4-005 Blue Mound-Latham In Service
X2-022 Brokaw-Lanesville In Service
Z1-073 Mendota Hills In Service
Z1-108 McHenry 34kV In Service
Z2-081 Streator 34.5kV In Service
Z2-087 Pontiac MidPoint-Brokaw 345kV In Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO) Identified Impacts
AG1-118 System Reinforcements:
TO Trans Owner ID Title Category Allocated Cost ($USD)
NIPS b3775.8 Upgrade existing terminal equipment at St. John on the existing Crete to St. John 345 kV line Contingent $0
Grand Total: $0

System Reinforcement: b3775.8
Type
Load Flow
TO
NIPS
RTEP ID / TO ID
b3775.8
Title
Upgrade existing terminal equipment at St. John on the existing Crete to St. John 345 kV line
Description
Part of b3375 Baseline project. Upgrade the existing terminal equipment (substation conductor) at St. John on the existing Crete to St. John 345 kV line with bundled 2x1590 ACSR Lapwing
Total Cost ($USD)
$0
Allocated Cost ($USD)
$0
Time Estimate
Dec 01 2026

Contingent

Note: Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line (Any)

New York Independent System Operator (NYISO) No Impact
Tennessee Valley Authority (TVA) No Impact
Louisville Gas & Electric (LG&E) No Impact
Duke Energy Carolinas (DUKE) No Impact
Duke Energy Progress – East (CPLE) No Impact
Duke Energy Progress – West (CPLW) No Impact

Affected System - Non-PJM Identified Violations

In accordance with PJM Tariff Part VII, Subpart D, section 312.A.1.b and as outlined in PJM Manual 14H, Section 13, in Phase III of the Cycle, PJM coordinates with the Affected System Operators to conduct any studies required to determine the impact of the New Service Request on any Affected System and will include the Affected System Study results in Phase III System Impact Study, if available from the Affected System Operator.

If your project required an Affected System Study, the results are shown below from the Affected System Operator.

For more details, please refer to your Affected System Study report by the Affected System Operator. If the Affected System Operator identified the need for a system reinforcement on their system due to their planning criteria, Project Developer must follow the Affected System Operator Tariff for construction of the network upgrade. PJM will list any required network upgrades identified by the Affected System Operator in the PJM Project Developer’s GIA under Schedule F.

Affected System network upgrade costs are included in the Adverse Study Impact calculation for DP3. See the Adverse Test Eligibility section of this Phase III SIS report.

Midcontinent Independent System Operator, Inc. (MISO) Identified Impacts
Note: This reflects the Affected System studies results provided by the Affected System Operator. These results may be subject to adjustments based on the outcome of any studies in the remaining phases of the Affected System Operator's Generator Interconnection Process.
Impacted Facility Transmission Owner Reinforcement Cost Cost Allocated to AG1-118 Scenarios
  • Wvrich 69.0 - Rochester TP 69.0 CKT 1
DEI DEI: Rebuild 1 mile of Wvrich - Rochester TP 69 kV
DEI: Rebuild 1 mile of 69kV with 477ACSR/VR2 @
100/120C the ratings assume that NIPSCO terminal
upgrades would not limit our T-Line rating. $1.5M
NIPSCO: Rebuild line, NIPSCO owns 0.037 miles of
0.9 mile line. NIPSCO portion included in Argos to
Rochester tap mitigation/cost.
$1,500,000 $73,305
  • NIPSCO LPC
  • Wvrich 69.0 - Rochester TP 69.0 CKT 1
NIPS NIPSCO: Rebuild line (.3miles)Wvrich - Rochester TP 69 kV
DEI: Rebuild 1 mile of 69kV with 477ACSR/VR2 @
100/120C the ratings assume that NIPSCO terminal
upgrades would not limit our T-Line rating. $1.5M
NIPSCO: Rebuild line, NIPSCO owns 0.037 miles of
0.9 mile line. NIPSCO portion included in Argos to
Rochester tap mitigation/cost.
$0 $0
  • NIPSCO LPC
  • Argos 69.0 - Plymouth 69.0 CKT 1
NIPS Rebuild Argos - Plymouth 69 kV line
Rebuild line, approx 10 miles
$12,654,948 $601,143
  • NIPSCO LPC
  • Argos 69.0 - Rochester TP 69.0 CKT 1
NIPS Rebuild Argos - Rochester TP 69 kV
Rebuild line, approx 3.2 miles
$4,049,583 $197,903
  • NIPSCO LPC
  • CAP BANK 230.0 - Gallagher 230.0 CKT 0
DEI Install 144 MVAR cap bank at Gallagher sub.
Install 144 MVAR cap bank at Gallagher sub.
$3,000,000 $83,565
  • MISO Voltage
  • CAP BANK 138.0 - Shoals 138.0 CKT 0
DEI Install 28.8 MVAR cap bank at Shoals sub
Install 28.8 MVAR cap bank at Shoals sub
$3,000,000 $82,278
  • MISO Voltage
  • CAP BANK 138.0 - Avon East 138.0 CKT 0
DEI Install 28.8 MVAR cap bank at Avon East sub
Install 28.8 MVAR cap bank at Avon East sub
$3,000,000 $73,585
  • MISO Voltage
  • Morrison Ditch 345.0 - Reynolds 345.0 CKT 1
NIPS LRTP-16: Morrison Ditch – Reynolds – Burr Oak
Install single circuit 345kV transmission line
from the existing Morrison Ditch
Substation, to the existing Reynolds Substation,
to the existing Burr Oak
Substation, to the existing Leesburg Substation,
to the existing Hiple Substation.
$0 $0
  • Contingent
  • Greentown 765.0 - Sorenson 765.0 CKT 1
ITCT LRTP-33: Greentown - Sorenson - Lulu
Install single circuit 765kV transmission line
from the existing Greentown
Substation to the existing Sorenson Substation, to
the existing Lulu Substation.
$0 $0
  • Contingent
  • Burr Oak 345.0 - Schahfer 345.0 CKT 1
NIPS LRTP-42: Burr Oak - Schahfer
Install single circuit 345kV transmission line
from the existing Burr Oak Substation to the
existing Schahfer Substation.
$0 $0
  • Contingent
New York Independent System Operator (NYISO) Not required
Tennessee Valley Authority (TVA) Not required
Louisville Gas & Electric (LG&E) Not required
Duke Energy Carolinas (DUKE) Not required
Duke Energy Progress – East (CPLE) Not required
Duke Energy Progress – West (CPLW) Not required

System Reinforcements

Based on the Phase III analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AG1-118 System Reinforcements:
TO RTEP ID Title Category Allocated Cost ($USD) Facilities Study
ComEd n7023.1 Reconductor the Electric Junction - Lombard line L11124 345 kV Line and perform associated station relay and protection upgrades. Cost Allocated $3,565,896
ComEd n9269.0 Reconductor the AD1-100 Tap - Wilton 345 kV line. Cost Allocated $3,284,503
AEP n5769.4 Reconductor ~8.58 Miles of 345 kV transmission line from Dumont Station to Structure 39 Cost Allocated $2,559,467
ComEd b3811.1 Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus. Contingent $0 N/A
ComEd s3011 Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration. Contingent $0 N/A
ComEd b3775.1 Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line Contingent $0 N/A
AEP n9243.0 Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles. Contingent $0 N/A
ComEd n9195.0 Install a new 345 kV circuit breaker at Station 12 Dresden. Contingent $0 N/A
AEP n4056.1 Replace the (1) 3000A 765kV CB at Dumont station Contingent $0 N/A
AEP b3775.11 Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating. Contingent $0 N/A
AEP b3775.6 Perform sag study mitigation work on the Dumont-Stillwell 345 kV line Contingent $0 N/A
AEP b3775.10 Perform sag study mitigation work on Olive – University Park Contingent $0 N/A
ComEd b3775.3 Rebuild ComEd’s section of 345 kV double circuit in IL from St. John to Crete Contingent $0 N/A
ComEd b3775.5 Replace E. Frankfort 345 kV circuit breaker “9-14” with 3150A SF6 circuit breaker. Contingent $0 N/A
ComEd n5145 Reconfigure Wilton 765kV bus Contingent $0 N/A
AEP n5808 CON Upgrade_AEP: eliminate the Eugene stuck breaker contingency. (AMIL upgrade will not be required) Contingent $0 N/A
Grand Total: $9,409,866

PJM evaluated the impact of topology changing reinforcements to mitigate the impacts driven by New Service Requests. PJM determined which reinforcements were eliminated as a result of modeling the topology changing reinforcements. PJM then grouped the topology changing and eliminated reinforcements by region and computed a discount factor to apply to reinforcements to reduce the cost of all these reinforcements down to the cost of contstructing only the topology changing reinforcements. For additional details, please click the icon below

Regional Topology Upgrade Conversion

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n7023.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n7023.1 / CE_NUN_L11124.1
Title
Reconductor the Electric Junction - Lombard line L11124 345 kV Line and perform associated station relay and protection upgrades.
Description
• Upgrade 13.5 Miles of 345kV transmission line 11124 from TSS 111 Electric Junction to TSS 120 Lombard • Upgrade relay & protection at 345kV substation TSS 111 Electric Junction & TSS 120 Lombard to support upgrade of 345kV transmission line, L1124
Total Cost ($USD)
$38,797,273
Discounted Total Cost ($USD)
$38,797,273
Allocated Cost ($USD)
$3,565,896
Time Estimate
36 Months

Contributor

Facility Contingency
ELECT JCT; B-LOMBARD ; B 345.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-114 18.5 MW 3.5% $1,347,650
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
14.9 MW 2.8% $1,081,553
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
9.9 MW 1.9% $721,036
AF1-280 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
31.2 MW 5.8% $2,268,876
AF1-296 24.8 MW 4.6% $1,800,625
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200, AG2-660, AH1-044, AH1-150, AH1-151
98.8 MW 18.5% $7,185,987
AF2-182 Nelson - Lee County 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF1-280, AF2-182
46.8 MW 8.8% $3,403,314
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200, AG2-660, AH1-044, AH1-150, AH1-151
32.9 MW 6.2% $2,395,305
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200, AG2-660, AH1-044, AH1-150, AH1-151
73.2 MW 13.7% $5,322,948
AF2-349 18.1 MW 3.4% $1,319,935
AF2-392 32.0 MW 6.0% $2,326,344
AG1-118 49.0 MW 9.2% $3,565,896
AG1-127 16.3 MW 3.1% $1,184,049
AG1-462 Cordova 345 kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-462, AG1-553, AG2-675
33.2 MW 6.2% $2,413,200
AG1-553 Cordova 345 kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-462, AG1-553, AG2-675
33.8 MW 6.3% $2,460,556

System Reinforcement: n9269.0
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n9269.0 / CE_NUN_L11212.5
Title
Reconductor the AD1-100 Tap - Wilton 345 kV line.
Description
• Reconductor 18.4 Miles of 345kV transmission line 11212 from TSS 112 Wilton Center to TSS 905 Essex. • Upgrade L11212 motor-operated switch and all cable conductors at line termination structure to 2-1590 kcmil ACSR.
Total Cost ($USD)
$37,989,655
Discounted Total Cost ($USD)
$37,989,655
Allocated Cost ($USD)
$3,284,503
Time Estimate
60 Months

Contributor

Facility Contingency
WILTON ; B-AD1-100 TAP 345.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-172 61.5 MW 24.5% $9,311,061
AE2-223 McLean 345kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-223, AF2-225
21.2 MW 8.4% $3,206,556
AE2-261 Kincaid Pana Tap - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-261, AG1-460
22.6 MW 9.0% $3,415,726
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200, AG2-660, AH1-044, AH1-150, AH1-151
18.3 MW 7.3% $2,771,569
AF2-095 22.8 MW 9.1% $3,452,353
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200, AG2-660, AH1-044, AH1-150, AH1-151
6.1 MW 2.4% $923,856
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200, AG2-660, AH1-044, AH1-150, AH1-151
13.6 MW 5.4% $2,052,947
AF2-225 McLean 345kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-223, AF2-225
21.2 MW 8.4% $3,206,556
AG1-118 21.7 MW 8.6% $3,284,503
AG1-374 39.8 MW 15.9% $6,021,866
AG1-460 Kincaid Pana Tap - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-261, AG1-460
2.3 MW 0.9% $342,662

System Reinforcement: n5769.4
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n5769.4 / AEPI0066a
Title
Reconductor ~8.58 Miles of 345 kV transmission line from Dumont Station to Structure 39
Description
•Remove ~8.58 miles of 954 KCM ACSR 45/7 conductor and shield wire along the AEP owned portion of the Dumont – Stillwell 345 kV line. •Remove and replace structures #1 & #38 •Modify structures #2, #3, #4, #5, #6, #7, #8, #9, #10, #11, #12, #13, #14, #15, #16, #17, #18, #19, #21, #22, #23, #24, #25, #26, #27, #28, #29, #30, #31, #33, #34, #35, #36, #37, #39 to accommodate the new line •Install ~8.58 miles of 954 KCM ACSR 54/7 conductor and shield wire on the new/modified structures •Install ~8.58 miles of dual OPGW and 144 CT fiber
Total Cost ($USD)
$31,234,000
Discounted Total Cost ($USD)
$31,234,000
Allocated Cost ($USD)
$2,559,467
Time Estimate
32 Months

Contributor

Facility Contingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
Cost Allocation
Project MW Impact Percent Allocation Allocated Cost ($USD)
AE1-114 15.2 MW 4.9% $1,545,692
AE1-172 26.9 MW 8.8% $2,738,608
AE2-223 McLean 345kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-223, AF2-225
12.8 MW 4.2% $1,303,031
AE2-341 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
14.5 MW 4.7% $1,474,423
AF1-030 Sandwich - Plano 138kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AE2-341, AF1-030, AF2-329
9.6 MW 3.1% $980,536
AF1-296 17.6 MW 5.8% $1,796,511
AF2-041 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200, AG2-660, AH1-044, AH1-150, AH1-151
24.2 MW 7.9% $2,466,685
AF2-095 13.6 MW 4.4% $1,386,331
AF2-142 12.7 MW 4.2% $1,297,117
AF2-143 12.4 MW 4.0% $1,264,491
AF2-199 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200, AG2-660, AH1-044, AH1-150, AH1-151
8.1 MW 2.6% $822,194
AF2-200 Nelson-Electric Junction 345kV - ComEd: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-041, AF2-199, AF2-200, AG2-660, AH1-044, AH1-150, AH1-151
16.1 MW 5.3% $1,644,388
AF2-226 Katydid Road 345kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-226, AF2-319
7.0 MW 2.3% $718,808
AF2-319 Katydid Road 345kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AF2-226, AF2-319
7.0 MW 2.3% $718,808
AF2-392 19.6 MW 6.4% $1,997,369
AF2-441 14.9 MW 4.9% $1,516,634
AG1-118 25.1 MW 8.2% $2,559,467
AG1-236 11.7 MW 3.8% $1,193,935
AG1-374 19.2 MW 6.3% $1,957,299
AG1-462 Cordova 345 kV (ComEd): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. The following project shared this POI:
AG1-462, AG1-553, AG2-675
18.2 MW 5.9% $1,851,670

System Reinforcement: n4056.1
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n4056.1 / AEPI0048a
Title
Replace the (1) 3000A 765kV CB at Dumont station
Description
Replace the 3000A 765kV CB A2 at Dumont station Cost Estimate updated to $3,346,389 from Facility Study
Total Cost ($USD)
$3,346,389
Discounted Total Cost ($USD)
$3,346,389
Allocated Cost ($USD)
$0
Time Estimate
18 to 24 Months

Contingent

Note: Based on PJM cost allocation criteria, AG1-118 does not receive cost allocation towards this upgrade which has been securitized by a prior Queue/Cycle.. Although AG1-118 may not have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
05DUMONT-05SORENS 765.0 kV Ckt 1 line (Any)

System Reinforcement: b3775.11
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b3775.11 / b3775.7a
Title
Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating.
Description
Upgrade the wavetrap at Dumont substation to increase the rating of the Stillwell-Dumont 345 kV line to match conductor rating.
Cost Information
Time Estimate
Dec 01 2026

Contingent

Note: Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)

System Reinforcement: b3775.6
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b3775.6
Title
Perform sag study mitigation work on the Dumont-Stillwell 345 kV line
Description
Perform sag study mitigation work on the Dumont-Stillwell 345 kV line (remove a center-pivot irrigation system from under the line, allowing for the normal and emergency ratings of the line to increase, replace two structures and modify a third structure).
Cost Information
Time Estimate
Nov 20 2026

Contingent

Note: Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)
05DUMONT-17STILLWELL 345.0 kV Ckt 1 line (Any)

System Reinforcement: b3775.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.1
Title
Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line
Description
Outside of the Green Acres substation, swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line to the University Park N-Olive 345 kV line to create a University Park N-Green Acres-Olive and St. John-Olive 345 kV lines.
Cost Information
Time Estimate
Dec 01 2026

ContingentTopology Changing

Note 1: Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line (Any)
17GREEN_ACRE-ST JOHN ; T 345.0 kV Ckt 1 line (Any)
17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line (Any)
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line (Any)
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (Any)
System Reinforcement: b3775.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.1
Title
Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line
Description
Outside of the Green Acres substation, swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line to the University Park N-Olive 345 kV line to create a University Park N-Green Acres-Olive and St. John-Olive 345 kV lines.
Cost Information
Time Estimate
Dec 01 2026
Cost Alloc Type
Contingent

System Reinforcement: b3775.10
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b3775.10
Title
Perform sag study mitigation work on Olive – University Park
Description
Perform a sag study on the Olive – University Park 345kV line to increase the operating temperature to 225 F. Remediation work includes two tower replacements on the line.
Cost Information
Time Estimate
Dec 01 2026

Contingent

Note: Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (Any)

System Reinforcement: s2509
Type
Load Flow
TO
NextEra
RTEP ID / TO ID
s2509 / (Pending)
Title
Rebuild the L97008: Univ. Park S/S-Olive S/S 345 kV
Description
Rebuild the (L97008: Univ. Park S/S-Olive S/S 345 kV) of the ~20 mile double-circuit line withmonopoles and new conductor utilizing existing ROW ( Univ. Park S/S-Olive S/S 345 kV) .
Cost Information
Time Estimate
Dec 31 2023

Not Contingent

Note: AG1-118 contributes to the loading of an overloaded facility that is being mitigated by a planned supplemental project. AG1-118 is not contingent on this supplemental project as it is already in-service.

Facility Contingency
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (Any)

System Reinforcement
Type
Load Flow
TO
AEP
RTEP ID / TO ID
(Pending)
Title
*Ameren Limit* AEP Ratings: 1443/1635 MVA SN/SE. (AMEREN: 1681/1793 MVA SN/SE)
Description
AEP Ratings: 1443/1635 MVA SN/SE. (AMEREN: 1681/1793 MVA SN/SE)
Total Cost ($USD)
$0
Discounted Total Cost ($USD)
$0
Allocated Cost ($USD)
$0
Time Estimate
0 to 1 Months

Note: This reinforcement is fictitious and will not be cost allocated to projects. It is listed for information purposes only.

Facility Contingency
05SULLIVAN-J1180 TAP 345.0 kV Ckt 1 line (Any)
05SULLIVAN-J1180 TAP 345.0 kV Ckt 1 line (Any)
05SULLIVAN-J2170 POI 345.0 kV Ckt 1 line (Any)
05SULLIVAN-J1180 POI 345.0 kV Ckt 1 line (Any)

System Reinforcement: b3775.3
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.3
Title
Rebuild ComEd’s section of 345 kV double circuit in IL from St. John to Crete
Description
Part of b3775 baseline. Rebuild ComEd’s section of 345 kV double circuit in IL from St. John to Crete (5 miles) with twin bundled 1277 ACAR conductor.
Cost Information
Time Estimate
Dec 01 2026

Contingent

Note: Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line (Any)

System Reinforcement: b3775.2
Type
Load Flow
TO
NextEra
RTEP ID / TO ID
b3775.2
Title
Reconductor NEET’s section of Crete(IN/IL border)-St. John 345 kV line (6.95 miles).
Description
Reconductor NEET’s section of Crete(IN/IL border)-St. John 345 kV line (6.95 miles).
Cost Information
Time Estimate
May 09 2023

Not Contingent

Note: AG1-118 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG1-118 is not contingent on this baseline upgrade as it is already in-service.

Facility Contingency
17STJOHN-CRETE EC ;BP 345.0 kV Ckt 1 line (Any)

System Reinforcement: b3775.5
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.5
Title
Replace E. Frankfort 345 kV circuit breaker “9-14” with 3150A SF6 circuit breaker.
Description
Part of b3775 baseline. Replace E. Frankfort 345 kV circuit breaker “9-14” with 3150A SF6 circuit breaker.
Cost Information
Time Estimate
Dec 01 2026

Contingent

Note: Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
E FRANKFO; B-CRETE EC ;BP 345.0 kV Ckt 1 line (Any)

System Reinforcement: n3515.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n3515.1 / ce-017
Title
Cherry Valley - Garden Prarie 345 kV: Line rebuild, station bus work, & Cherry Valley 345kV breaker replacement
Description
• Rebuild entire 345kV transmission line L.15616 from TSS 156 Cherry Valley to TSS 971 Prairie (approximately 15.4 miles). • Replace static wire with dual OPGW that each contain single-mode 48 count fiber. Install two (2) 48-ct FDPs at TSS 156 Cherry Valley and TSS 971 Prairie to account for new OPGW. • Upgrade the existing substation TSS 156 Cherry Valley by upgrading existing 345kV BT 4-7 circuit breaker and associated disconnect switches. • Upgrade SCADA, relay & protection at 345kV substation TSS 156 Cherry Valley to support upgrade of 345kV L.15616.
Total Cost ($USD)
$84,712,245
Discounted Total Cost ($USD)
$84,712,245
Allocated Cost ($USD)
$0
Time Estimate
50 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG1-118 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG1-118 could receive cost allocation. Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 is a potential Aggregate Pool Contributor.

Facility Contingency
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line (Any)
CHERRY VA; B-GARDEN PR; R 345.0 kV Ckt 1 line (Any)

System Reinforcement: n5318.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n5318.1 / ce-012a
Title
Garden Prarie - Silver Lake R 345 kV: Line rebuild, station bus work & Silver Lake 345kV Breaker Replacement
Description
• Rebuild entire 345kV transmission line L.97104 from TSS 971 Prairie to TSS 138 Silver Lake (approximately 24.7 miles). • Replace static wire with OPGW that contains single-mode 48 count fiber. Install 48-ct FDP at TSS 138 Silver Lake and TSS 971 Prairie to account for new OPGW. • Upgrade the existing substation TSS138 Silver Lake by replacing existing circuit breaker 345kV BT 3-4 & associated disconnect switches and replacing the line disconnect switch for 345kV line 97104. • Upgrade relay & protection at 345kV substation TSS 138 Silver Lake to support upgrade of 345kV transmission line, 97104.
Total Cost ($USD)
$163,968,683
Discounted Total Cost ($USD)
$163,968,683
Allocated Cost ($USD)
$0
Time Estimate
60 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG1-118 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG1-118 could receive cost allocation. Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 is a potential Aggregate Pool Contributor.

Facility Contingency
SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line (Any)
SILVER LK; R-GARDEN PR; R 345.0 kV Ckt 1 line (Any)

System Reinforcement: s3011
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
s3011 / CE_S3011
Title
Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration.
Description
Replace 345 kV open air straight bus with GIS in a breaker and half configuration (34 Circuit Breakers) at Goodings Grove with 80kA capability.
Cost Information
Time Estimate
Dec 31 2028

ContingentTopology Changing

Note 1: Although AG1-118 may not presently have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
(Any) COMED_P4_116-45-TR82____SRT-A
(Any) COMED_P4_116-45-L11614__SRT-A
(Any) COMED_P4-6_116-345-R______SRT-A
(Any) COMED_P2-2_116_GG-345R__2_SRT-A
(Any) COMED_P4_116-45-L0303___SRT-A
System Reinforcement: s3011
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
s3011 / CE_S3011
Title
Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration.
Description
Replace 345 kV open air straight bus with GIS in a breaker and half configuration (34 Circuit Breakers) at Goodings Grove with 80kA capability.
Cost Information
Time Estimate
Dec 31 2028
Cost Alloc Type
Contingent

System Reinforcement: n5145
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n5145
Title
Reconfigure Wilton 765kV bus
Description
Reconfigure Wilton 765kV bus thereby allowing for 765kV L11216 (currently on Bus 6) to be relocated to Bus 8. Along with this line relocation, installation of 2-765kV BT CBs (6-8 & 8-2). Cost increased from $12M to $55M. This will eliminate the stuck breaker contingencies '112-65-BT4-5__' and '112-65-BT5-6__'. No other contingency updates needed.
Total Cost ($USD)
$55,229,373
Discounted Total Cost ($USD)
$55,229,373
Allocated Cost ($USD)
$0
Time Estimate
Dec 31 2025

Contingent

Note: Based on PJM cost allocation criteria, AG1-118 does not receive cost allocation towards this upgrade which has been securitized by a prior Queue/Cycle.. Although AG1-118 may not have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
(Any) COMED_P4_112-65-BT3-4__
(Any) COMED_P4_112-65-BT2-3__
(Any) COMED_P4_112-65-BT5-6__
(Any) COMED_P4_112-65-BT4-5___SRT-A
(Any) COMED_P4_112-65-BT5-6___SRT-A
(Any) COMED_P4_112-65-BT2-3___SRT-A

System Reinforcement: n5808
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n5808 / N5808
Title
CON Upgrade_AEP: eliminate the Eugene stuck breaker contingency. (AMIL upgrade will not be required)
Description
• AEP will install two (2) new 345 kV circuit breakers into the "A1" and "B1" breaker positions at the Eugene 345 kV Station. • AEP will relocate the Bunsonville 345 kV line connection from bus #2 to bus #1. The metering associated with this line connection will also be replaced and relocated accordingly.
Total Cost ($USD)
$3,424,014
Discounted Total Cost ($USD)
$3,424,014
Allocated Cost ($USD)
$0
Time Estimate
May 15 2026

Contingent

Note: Based on PJM cost allocation criteria, AG1-118 does not receive cost allocation towards this upgrade which has been securitized by a prior Queue/Cycle.. Although AG1-118 may not have cost responsibility for this upgrade, AG1-118 may need this upgrade in-service to be deliverable to the PJM system. If AG1-118 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
(Any) AEP_P4_#3128_05EUGENE 345_A2_SRT-A

System Reinforcement: b3811.1

AG1-118 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3811.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3811.1 / CE_PJM B3811_L11323
Title
Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus.
Description
Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: n9243.0

AG1-118 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9243.0
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n9243.0 / AEPSERG13
Title
Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles.
Description
At the Jefferson Station: • Expand the northeast corner of the station • Remove Circuit breaker C1 • Install one (1) new 765/345 kV transformer and associated equipment • Install one (1) new 765 kV circuit breaker with associated control relaying and breaker disconnect switches • Install one (1) new 345 kV circuit breaker with associated control relaying and breaker disconnect switches • Install a new station service center At the Clifty Creek Station: • Extend 345 kV bus 1 and 2 to make room for a new breaker string • Move a section of the 138 kV bus underground to make room for the new breaker string • Relocate circuit breaker S to the new string • Install two (2) new 345 kV circuit breakers on the new string •Remove the existing Jefferson – Clifty Creek 345 kV line •Construct a new Jefferson – Clifty Creek 345 kV double circuit line •Evaluate line settings for all appropriate lines •Install direct fiber relaying between the Jefferson and Clifty Creek station •Associated conductors (buswork, ground grid, jumpers), telecom terminal equipment, insulators, arresters, foundations, and structures
Total Cost ($USD)
$200,238,000
Allocated Cost ($USD)
$0
Time Estimate
55 Months
Cost Alloc Type
Contingent

System Reinforcement: n9195.0

AG1-118 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9195.0
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n9195.0 / CE_NUN_STA12_345 NEW CB
Title
Install a new 345 kV circuit breaker at Station 12 Dresden.
Description
• Upgrade the existing substation STA 12 Dresden by adding 345kV BT 14-15 circuit breaker and associated disconnect switches. • Upgrade relay & protection at 345kV substation STA 12 Dresden to support installation of 345kV BT 14-15
Total Cost ($USD)
$3,357,627
Allocated Cost ($USD)
$0
Time Estimate
45 Months
Cost Alloc Type
Contingent

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AG1-118


AG1-118 Contributions into Topology or Eliminated Reinforcements:
Type TO RTEP ID / TO ID Title Topo or Elim MW Impact Percent Allocation Category Allocated Cost ($USD)
Load Flow ComEd b3775.1 Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line Topology - 0.0% Contingent $0
Load Flow ComEd s3011 / CE_S3011 Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration. Topology - 0.0% Contingent $0
Contributions into Topology or Eliminated Reinforcement Total: $0
AG1-118 Contingent Region Topology Upgrades:
TO RTEP ID Title Category Allocated Cost ($USD)
ComEd b3811.1 Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus. Contingent $0
ComEd s3011 Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration. Contingent $0
ComEd b3775.1 Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line Contingent $0
AEP n9243.0 Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles. Contingent $0
ComEd n9195.0 Install a new 345 kV circuit breaker at Station 12 Dresden. Contingent $0
Region Topology Upgrade Total: $0

Attachments

AG1-118 One Line Diagram

AG1-118 One Line Diagram.jpg

[1]Winter load flow analysis will be performed starting in Transition Cycle 2.