AG1-447 Phase III Study Report

v1.00 released 2025-09-18 17:10

Olive-University Park 345 kV

55.0 MW Capacity / 55.0 MW Energy

Introduction

This Phase III System Impact Study Report (PH3) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 312 for New Service Requests (projects) in Transition Cycle 1. The Project Developer/Eligible Customer (developer) is RWE Solar Development, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is AEP Indiana Michigan Transmission Company, Inc..

Preface

New Service Requests meeting the requirements of Tariff, Part VII, Subpart D, Decision Point II, were included in the Phase III System Impact Study. The Phase III System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase III System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.7, PJM takes the following actions during the Phase III System Impact Study:
  1. PJM will retool load flow, short circuit and stability results based on decisions made by Project Developers or Eligible Customers during Decision Point II.
  2. PJM will coordinate with Affected System Operators to conduct any studies required to determine the final impact of a New Service Request on any Affected System and will include the final Affected System Study results in the Phase III System Impact Study, if available from the Affected System.
  3. The Phase III System Impact Study Results will be publicly available on PJM’s website; Project Developers and Eligible Customers must obtain the results from the website.
  4. PJM will tender draft final agreements to Project Developers or Eligible Customers.
The Transmission Owner takes the following actions during the Phase III System Impact Study:
  1. Verify Interconnection Facilities and Network Upgrades required to accommodate the New Service Request.
  2. Perform a Facilities Study. The Facilities Study in Phase III System Impact Study phase will be for the System Reliability Network Upgrades. The Facilities Study requirements are outlined in Attachment C of PJM Manual 14H. The study will be conducted pursuant to Tariff, Part VII, Subpart D, section 307(A)(7).

Decision Point III Requirements

At the close of Phase III System Impact Study, PJM will initiate Decision Point III (DP3). During DP3, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 313.A. Additional information on these elements is available in PJM Manual 14H sections 4.8, 6, and 7.

As stated in PJM Tariff, Part VII, Subpart D, section 313.C, New Service Requests may not be changed or modified in any way for any reason during Decision Point III. A New Service Request must be withdrawn and resubmitted in a subsequent Cycle to the extent a Project Developer or Eligible Customer wants to make any changes to such New Service Request at this point in the Cycle process.

Adverse Test Eligibility

This New Service Request does not meet the Adverse Study Impact Criteria and has the option to either move forward in the Cycle process or withdraw at DP3 with cumulative Readiness Deposits forfeited. See adverse study impact calculation below.

This section details whether a Project Developer or Eligible Customer qualifies for the Adverse Study Impact clause outlined in the PJM OATT, Part VII, Subpart D, section 313.B and Manual 14H, section 6.2.2. In order to qualify for an Adverse Study Impact at Decision Point III, the Network Upgrade cost from Phase II to Phase III must:

  1. Increase overall by 35% or more
  2. Increases by more than $25,000 per MW (Includes Costs identified in Affected System studies)

If a New Service Request meets the criteria above and chooses to withdraw the request, PJM will refund the cumulative Readiness Deposit amounts paid at the Application Phase, Decision Point I, and Decision Point II (RD1, and RD2 and RD3, respectively).

The below calculations show the computation of this New Service Request's Adverse Study Impact

DP3 Adverse Eligibility = DP3 Adverse Cost Alloc DP2 Adverse Cost Alloc > 1.35 AND ( DP3 Adverse Cost Alloc - DP2 Adverse Cost Alloc ) Project Size > $25,000 per MW
DP3 Adverse Eligibility = $352,634 $1,334,662 = 0.26 AND ( $352,634 - $1,334,662 ) 55.0 = $-17,855 per MW

General

The Project Developer has proposed an uprate to a planned/existing Solar facility located in the American Electric Power zone — LaPorte County, Indiana. This project is an increase to the developer’s AF2-359/AG1-436 project(s), which will share the same Point of Interconnection. The AG1-447 project is a 55.0 MW uprate (55.0 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 305.0 MW with 205.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG1-447
Project Name:
Olive-University Park 345 kV
Project Developer Name:
RWE Solar Development, LLC
State:
Indiana
County:
LaPorte
Transmission Owner:
AEP Indiana Michigan Transmission Company, Inc.
MFO:
305.0
MWE:
55.0
MWC:
55.0
Battery Storage Specification:
220.0 MWh, 4.0-hr class
Grid Charging:
Yes
Fuel Type:
Storage
Basecase Study Year:
2027

Physical Interconnection Facility Study

Report Available

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AG1-447 will interconnect on the AEP Indiana Michigan Transmission Company, Inc. transmission system as an uprate to AF2-359 tapping the Olive to University Park 345 kV line.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In Phase III SIS, the interconnected Transmission Owner has performed a facilities study for the required System Reliability Network Upgrades. The Facilities Studies for the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades were performed by the Transmission Owner in Phase II and are available for download on PJM.com (see General Section for document links).

Based on the Phase III SIS results, the AG1-447 project has the following allocation of costs for interconnection. The Security amount required at DP3 is also shown below.

Cost Summary
Description Cost Allocated to AG1-447 Cost Subject to Security
Transmission Owner Interconnection Facilities (TOIF) $138,247 $138,247
Other Scope $0 $0
Option to Build Oversight $0 $0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades $0 $0
Network Upgrades $60,764 $60,764
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL) $0 $0
Transient Stability $0 $0
Short Circuit $0 $0
Transmission Owner Analysis
SubRegional $0 $0
Distribution $0 $0
Affected System Study Reinforcements
AFS - PJM Violatons $0 $0
AFS - Non-PJM Violations $291,870 $0
Total $490,881 $199,011

* Contributes to calculation for Security. See Security Section of this report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Security Requirement

Per Tariff Part VII, Subpart D, section 313 (Decision Point III) A.1.a and PJM Manual 14H, section 8.6.1, Project Developers and Eligible Customers are required to provide Security in a form acceptable to PJM at Decision Point III which runs concurrently with the projects' Final Agreement Negotiation Phase. Security may be in the form of cash, letter of credit, or other form of Security acceptable to PJM (see PJM M14H, Section 6.4).

Security is calculated for a New Service Request based on the Network Upgrade costs allocated pursuant to the Phase III System Impact Study results.

Note 1: "Network Upgrades" referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Security Due for AF2-359/AG1-436/AG1-447

Security has been calculated for the AF2-359/AG1-436/AG1-447 project(s) based on the Phase III System Impact Study results and is shown in the table below. This Security must be provided at Decision Point III through either a wire transfer or letter of credit or other form of Security deemed acceptable by PJM per Manual 14H, Section 6.4.

Security Due for AF2-359/AG1-436/AG1-447
Project(s): AF2-359/AG1-436/AG1-447
Final Agreement Security (A): $3,007,904
Portion of Costs Already Paid (B): $0
Net Security Due at DP3: A B = $3,007,904
Note: Failure to provide an acceptable form of Security by the end of Decision Point III will result in withdrawal and termination of the New Service Request.

Transmission Owner Scope of Work

AG1-447 will interconnect with the AEP transmission system as an uprate to a previous interconnection at the Olive - University Park 345 kV Station. The estimates provided in this report are preliminary in nature, as they were determined without the benefit of detailed engineering studies. Final estimates will require an on-site review and coordination to determine final construction requirements.

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Network Upgrades
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
n9567.0

Proposed AF2-359 345 kV Station: Review and revise the protective relay settings at the AF2-359 proposed 345 kV Station to account for the additional generation of AG1-436. o Settings will need to be revised for each generation project (AG1-436 & AG1-447) unless they share an in-service date.

$36,901 $7,080 $14,081 $2,702 $60,764 $30,382 (See Note 1)
n9566.0

Proposed AF2-359 345 kV Station: Review and revise the protective relay settings at the AF2-359 proposed 345 kV Station to account for the additional generation of AG1-447. o Settings will need to be revised for each generation project (AG1-436 & AG1-447) unless they share an in-service date.

$36,901 $7,080 $14,081 $2,702 $60,764 $30,382 (See Note 1)
Transmission Owner Interconnection Facilities
RTEP ID Description Direct Indirect Total Cost ($USD) Allocated Cost ($USD)
Labor Materials Labor Materials
(Pending)

AG1-436 Transmission Owner Interconnection Facilities. • IMTCo will procure one (1) metering panel with three (3) primary meters and two (2) ethernet switches to be installed in the AG1-436 and AG1-447 Project Developer's collector stations. • IMTCo will procure one (1) connected grid router (CGR) to be installed in the Project Developer's originating project collector station (AF2-359).

$106,608 $51,442 $23,199 $12,553 $193,802 $96,901 (See Note 1)
(Pending)

AG1-447 Transmission Owner Interconnection Facilities. • IMTCo will procure one (1) metering panel with three (3) primary meters and two (2) ethernet switches to be installed in the AG1-436 and AG1-447 Project Developer's collector stations. • IMTCo will procure one (1) connected grid router (CGR) to be installed in the Project Developer's originating project collector station (AF2-359).

$48,465 $21,971 $8,433 $3,823 $82,692 $41,346 (See Note 1)

Based on the scope of work for the Interconnection Facilities, it is expected to take 4 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase 2 of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.

The minimum and maximum schedules reflect the amount of time (in months) that AEP projects their portion of the construction project scope elapsing from the time of agreement assuming commercial operation of the preceding project has been achieved. The minimum schedule assumes that the Transmission Owners only scope of work is review and revision of relay settings at the interconnection station. The maximum schedule assumes the need for additional work being required at the interconnection station.  Any material ordering or construction work done prior to Engineering and Procurement or Generation Interconnection Agreements is done solely at the Project Developers risk. There is a potential that any work done or materials ordered prior to agreements and the ensuing detailed engineering processes does not meet AEP specifications, resulting in rejection of the completed work.

Transmission Owner Analysis

No Transmission Owner impacts identified.

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. AEP interconnection requirements can be found here. Refer to AG1-447 Physical Interconnection Facilities Study for additional requirements found in the General Section of the report.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards and in the Physical Interconnection Facilities Study.

Summer Peak Analysis

The New Service Request was evaluated as a 55.0 MW (55.0 MW Capacity) injection in the AEP area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential summer peak period network impacts were as follows:

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The full energy output of Generation Interconnection Requests are evaluated for multiple facility contingencies (double circuit tower line, fault with a stuck breaker, and bus fault).

The following flowgates remain after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
ATSI/ITCT 19MON12-02LALLENDORF 345.0 kV Ckt 1 line
264612 to 241901 ckt 1
ATSI_P7-1_TE-345-025T_SRT-A-2
CONTINGENCY 'ATSI_P7-1_TE-345-025T_SRT-A-2'
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 256583 CKT 1   /*19LULU       345.0 - 18MOROCCO    345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264613 CKT 1   /*19LULU       345.0 - 19MON34      345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264839 CKT 1   /*19LULU       345.0 - 19MILAN      345.0
 DISCONNECT BRANCH FROM BUS 264599 TO BUS 955780 CKT 1   /*19MAJTC      345.0 - J1062 POI    345.0
END
Tower AC 101.76 % 1660.0 B 1689.24 4.12
ATSI/METC 18MOROCCO-02ALLEN 345.0 kV Ckt 1 line
256583 to 238530 ckt 1
ATSI_P7-1_TE-345-022T_SRT-A-1_SENS
CONTINGENCY 'ATSI_P7-1_TE-345-022T_SRT-A-1_SENS'
 DISCONNECT BRANCH FROM BUS 238889 TO BUS 264594 CKT 1   /*02LEMOYN     345.0 - 19LULU       345.0
 DISCONNECT BRANCH FROM BUS 241901 TO BUS 264612 CKT 1   /*02LALLENDORF 345.0 - 19MON12      345.0
END
Tower AC 111.86 % 1793.0 B 2005.59 4.8
ATSI/ITCT 19MON12-02LALLENDORF 345.0 kV Ckt 1 line
264612 to 241901 ckt 1
ATSI_P7-1_TE-345-025T_SRT-A-1_SENS
CONTINGENCY 'ATSI_P7-1_TE-345-025T_SRT-A-1_SENS'
 DISCONNECT BRANCH FROM BUS 238889 TO BUS 264594 CKT 1   /*02LEMOYN     345.0 - 19LULU       345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 256583 CKT 1   /*19LULU       345.0 - 18MOROCCO    345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264613 CKT 1   /*19LULU       345.0 - 19MON34      345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264839 CKT 1   /*19LULU       345.0 - 19MILAN      345.0
END
Tower AC 104.14 % 1660.0 B 1728.76 4.12

Details for 19MON12-02LALLENDORF 345.0 kV Ckt 1 line l/o ATSI_P7-1_TE-345-025T_SRT-A-2


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: ATSI/ITCT
Facility Description:
19MON12-02LALLENDORF 345.0 kV Ckt 1 line
264612 to 241901 ckt 1
Contingency Name:
ATSI_P7-1_TE-345-025T_SRT-A-2
CONTINGENCY 'ATSI_P7-1_TE-345-025T_SRT-A-2'
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 256583 CKT 1   /*19LULU       345.0 - 18MOROCCO    345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264613 CKT 1   /*19LULU       345.0 - 19MON34      345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264839 CKT 1   /*19LULU       345.0 - 19MILAN      345.0
 DISCONNECT BRANCH FROM BUS 264599 TO BUS 955780 CKT 1   /*19MAJTC      345.0 - J1062 POI    345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 101.76 %
Rating: 1660.0 MVA
Rating Type: B
MVA to Mitigate: 1689.24 MVA
MW Contribution: 4.12 MW
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area: ATSI/ITCT
Facility Description:
19MON12-02LALLENDORF 345.0 kV Ckt 1 line
264612 to 241901 ckt 1
Contingency Name:
ATSI_P7-1_TE-345-025T_SRT-A-2
CONTINGENCY 'ATSI_P7-1_TE-345-025T_SRT-A-2'
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 256583 CKT 1   /*19LULU       345.0 - 18MOROCCO    345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264613 CKT 1   /*19LULU       345.0 - 19MON34      345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264839 CKT 1   /*19LULU       345.0 - 19MILAN      345.0
 DISCONNECT BRANCH FROM BUS 264599 TO BUS 955780 CKT 1   /*19MAJTC      345.0 - J1062 POI    345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 112.55 %
Rating: 1660.0 MVA
Rating Type: B
MVA to Mitigate: 1868.38 MVA
MW Contribution: 4.5 MW
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
965681 AG1-436 C Adder 5.61 MW 4.77 MW
965682 AG1-436 E Adder 3.74 MW 3.18 MW
966431 AG1-512 C Adder 1.14 MW 0.96 MW
966432 AG1-512 E Adder 1.7 MW 1.45 MW
247528 05COVRT1 50/50 4.64 MW 4.64 MW
247529 05COVRT2 50/50 4.64 MW 4.64 MW
247530 05COVRT3 50/50 4.64 MW 4.64 MW
247531 05COVRT4 50/50 2.79 MW 2.79 MW
247532 05COVRT5 50/50 2.77 MW 2.77 MW
247533 05COVRT6 50/50 2.27 MW 2.27 MW
247966 05WTRV SLR E 50/50 0.25 MW 0.25 MW
247967 05OLIV SLR E Adder 0.21 MW 0.18 MW
247969 Z2-116 E Adder 0.12 MW 0.1 MW
910542 X3-005 E Adder 0.4 MW 0.34 MW
943001 AE2-323 C Adder 5.11 MW 4.34 MW
943002 AE2-323 E Adder 2.51 MW 2.13 MW
943021 AE2-325 C 50/50 3.15 MW 3.15 MW
943022 AE2-325 E 50/50 2.1 MW 2.1 MW
944161 AF1-084 C 50/50 5.55 MW 5.55 MW
944162 AF1-084 E 50/50 3.17 MW 3.17 MW
944961 AF1-161 C 50/50 2.51 MW 2.51 MW
945641 AF1-229 C Adder -7.25 MW -6.16 MW
960681 AF2-359 C Adder 5.61 MW 4.77 MW
960682 AF2-359 E Adder 3.74 MW 3.18 MW
960841 AF2-375 C Adder -7.25 MW -6.16 MW
960981 AF2-389 C Adder 2.89 MW 2.46 MW
960982 AF2-389 E Adder 1.93 MW 1.64 MW
243071 05BERRINSP G 50/50 0.05 MW 0.05 MW
244412 05WTRV SLR C 50/50 0.04 MW 0.04 MW
274675 JOLIET 29;7U Adder 37.59 MW 31.95 MW
274676 JOLIET 29;8U Adder 37.59 MW 31.95 MW
274687 WILL CNTY;4U Adder 34.99 MW 29.74 MW
274788 SE CHICAG;5U Adder 2.64 MW 2.25 MW
274789 SE CHICAG;6U Adder 2.64 MW 2.25 MW
274790 SE CHICAG;7U Adder 2.64 MW 2.25 MW
274791 SE CHICAG;8U Adder 2.64 MW 2.25 MW
274792 SE CHICAG;9U Adder 2.65 MW 2.25 MW
274793 SE CHICAG;0U Adder 2.65 MW 2.25 MW
274794 SE CHICAG;1U Adder 2.65 MW 2.25 MW
274795 SE CHICAG;2U Adder 2.65 MW 2.25 MW
933411 AC2-154 C Adder 1.31 MW 1.11 MW
933412 AC2-154 E Adder 2.14 MW 1.82 MW
941781 AE2-181 C Adder -2.72 MW -2.31 MW
247604 X1-042 50/50 0.07 MW 0.07 MW
275149 KELLYCK ;1E Adder 9.67 MW 8.22 MW
293519 PILOT HIL;1E Adder 9.67 MW 8.22 MW
936632 AD2-079 E O1 Adder 0.72 MW 0.62 MW
936141 AD2-020 C 50/50 6.22 MW 6.22 MW
936371 AD2-047 C Adder 2.35 MW 2.0 MW
936372 AD2-047 E Adder 11.47 MW 9.75 MW
936461 AD2-060 C Adder 1.38 MW 1.17 MW
944932 AF1-158 E Adder 5.19 MW 4.41 MW
945111 AF1-176 C Adder 15.19 MW 12.91 MW
945112 AF1-176 E Adder 14.08 MW 11.97 MW
945421 AF1-207 C Adder 2.36 MW 2.01 MW
945422 AF1-207 E Adder 10.16 MW 8.63 MW
945502 AF1-215 E Adder 9.05 MW 7.69 MW
959141 AF2-205 C Adder 8.69 MW 7.38 MW
959142 AF2-205 E Adder 5.79 MW 4.92 MW
960591 AF2-350 C Adder 4.14 MW 3.52 MW
960592 AF2-350 E Adder 2.76 MW 2.35 MW
961051 AF2-396 C Adder 19.89 MW 16.91 MW
961501 AF2-441 C Adder 5.67 MW 4.82 MW
961502 AF2-441 E Adder 8.5 MW 7.22 MW
939391 AE1-170 C Adder 6.1 MW 5.19 MW
939392 AE1-170 E Adder 8.43 MW 7.17 MW
940581 AE2-045 C Adder 6.04 MW 5.13 MW
940582 AE2-045 E Adder 8.29 MW 7.05 MW
962601 AG1-109 C 50/50 2.51 MW 2.51 MW
964401 AG1-302 C Adder 13.3 MW 11.3 MW
964402 AG1-302 E Adder 8.87 MW 7.54 MW
936142 AD2-020 E 50/50 3.83 MW 3.83 MW
957371 AF2-031 C Adder 0.57 MW 0.49 MW
957372 AF2-031 E Adder 0.86 MW 0.73 MW
957841 AF2-078 C Adder 8.35 MW 7.09 MW
957842 AF2-078 E Adder 5.56 MW 4.73 MW
957891 AF2-083 C Adder 9.63 MW 8.19 MW
957892 AF2-083 E Adder 4.82 MW 4.09 MW
958011 AF2-095 C Adder 5.97 MW 5.07 MW
958012 AF2-095 E Adder 3.98 MW 3.38 MW
958381 AF2-132 C Adder 13.3 MW 11.3 MW
958382 AF2-132 E Adder 8.87 MW 7.54 MW
958391 AF2-133 C Adder 13.12 MW 11.16 MW
958392 AF2-133 E Adder 8.75 MW 7.44 MW
958402 AF2-134 E Adder 3.02 MW 2.56 MW
964861 AG1-349 C Adder 11.48 MW 9.76 MW
964862 AG1-349 E Adder 7.65 MW 6.5 MW
965791 AG1-447 C Adder 4.12 MW 3.5 MW
939161 AE1-146 C Adder -6.96 MW -5.92 MW
943961 AF1-064 C Adder -3.65 MW -3.1 MW
990142 J1224 G External Queue 34.11 MW 34.11 MW
990527 J1329 G External Queue 4.03 MW 4.03 MW
991182 J1586 G External Queue 48.2 MW 48.2 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 217.98 MW 217.98 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 24.24 MW 24.24 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 8.23 MW 8.23 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.0 MW 2.0 MW
NY PJM->LTFIMP_NY CLTF 1.23 MW 1.23 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.74 MW 1.74 MW
WEC LTFEXP_WEC->PJM CLTF 2.13 MW 2.13 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.39 MW 0.39 MW
TVA LTFEXP_TVA->PJM CLTF 3.62 MW 3.62 MW
MEC LTFEXP_MEC->PJM CLTF 8.66 MW 8.66 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.24 MW 5.24 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.39 MW 0.39 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 12.9 MW 12.9 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.19 MW 0.19 MW

Details for 18MOROCCO-02ALLEN 345.0 kV Ckt 1 line l/o ATSI_P7-1_TE-345-022T_SRT-A-1_SENS


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: ATSI/METC
Facility Description:
18MOROCCO-02ALLEN 345.0 kV Ckt 1 line
256583 to 238530 ckt 1
Contingency Name:
ATSI_P7-1_TE-345-022T_SRT-A-1_SENS
CONTINGENCY 'ATSI_P7-1_TE-345-022T_SRT-A-1_SENS'
 DISCONNECT BRANCH FROM BUS 238889 TO BUS 264594 CKT 1   /*02LEMOYN     345.0 - 19LULU       345.0
 DISCONNECT BRANCH FROM BUS 241901 TO BUS 264612 CKT 1   /*02LALLENDORF 345.0 - 19MON12      345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 111.86 %
Rating: 1793.0 MVA
Rating Type: B
MVA to Mitigate: 2005.59 MVA
MW Contribution: 4.8 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
243353 05OLIVE 50/50 0.08 MW 0.08 MW
965681 AG1-436 C Adder 6.55 MW 5.56 MW
965682 AG1-436 E Adder 4.36 MW 3.71 MW
246397 05ELKHART HY 50/50 0.03 MW 0.03 MW
246422 05MAYFLWER 50/50 0.1 MW 0.1 MW
246431 05BUCHANAN 50/50 0.04 MW 0.04 MW
247528 05COVRT1 50/50 5.45 MW 5.45 MW
247529 05COVRT2 50/50 5.45 MW 5.45 MW
247530 05COVRT3 50/50 5.45 MW 5.45 MW
247531 05COVRT4 50/50 3.28 MW 3.28 MW
247532 05COVRT5 50/50 3.25 MW 3.25 MW
247533 05COVRT6 50/50 2.67 MW 2.67 MW
247620 Y3-023 50/50 0.08 MW 0.08 MW
247643 Z2-116 C 50/50 0.02 MW 0.02 MW
247966 05WTRV SLR E 50/50 0.29 MW 0.29 MW
247967 05OLIV SLR E 50/50 0.25 MW 0.25 MW
247969 Z2-116 E 50/50 0.14 MW 0.14 MW
943001 AE2-323 C Adder 5.81 MW 4.94 MW
943002 AE2-323 E Adder 2.85 MW 2.42 MW
943021 AE2-325 C 50/50 3.69 MW 3.69 MW
943022 AE2-325 E 50/50 2.46 MW 2.46 MW
944161 AF1-084 C 50/50 6.5 MW 6.5 MW
944162 AF1-084 E 50/50 3.71 MW 3.71 MW
944961 AF1-161 C 50/50 2.94 MW 2.94 MW
945641 AF1-229 C Adder -8.62 MW -7.32 MW
960681 AF2-359 C Adder 6.55 MW 5.56 MW
960682 AF2-359 E Adder 4.36 MW 3.71 MW
960841 AF2-375 C Adder -9.3 MW -7.9 MW
960981 AF2-389 C 50/50 3.38 MW 3.38 MW
960982 AF2-389 E 50/50 2.26 MW 2.26 MW
243071 05BERRINSP G 50/50 0.06 MW 0.06 MW
243440 05CKG1 50/50 18.64 MW 18.64 MW
244412 05WTRV SLR C 50/50 0.05 MW 0.05 MW
244415 05OLIV SLR C 50/50 0.04 MW 0.04 MW
270142 AA2-116_CT1 50/50 6.83 MW 6.83 MW
270143 AA2-116_CT2 50/50 6.83 MW 6.83 MW
270144 AA2-116_ST 50/50 6.04 MW 6.04 MW
274788 SE CHICAG;5U Adder 3.08 MW 2.62 MW
274789 SE CHICAG;6U Adder 3.08 MW 2.62 MW
274790 SE CHICAG;7U Adder 3.08 MW 2.62 MW
274791 SE CHICAG;8U Adder 3.08 MW 2.62 MW
274792 SE CHICAG;9U Adder 3.09 MW 2.62 MW
274793 SE CHICAG;0U Adder 3.09 MW 2.62 MW
274794 SE CHICAG;1U Adder 3.09 MW 2.62 MW
274795 SE CHICAG;2U Adder 3.09 MW 2.62 MW
941781 AE2-181 C Adder -7.38 MW -6.27 MW
243352 05NTRDAM 50/50 0.97 MW 0.97 MW
246416 05TWIN BRNCH 50/50 0.03 MW 0.03 MW
246476 05NILES 50/50 0.02 MW 0.02 MW
246477 05NILES 50/50 0.02 MW 0.02 MW
246536 05MOTTVILLE 50/50 0.01 MW 0.01 MW
247604 X1-042 50/50 0.08 MW 0.08 MW
270216 AD2-079_C O1 50/50 0.21 MW 0.21 MW
936632 AD2-079 E O1 50/50 0.85 MW 0.85 MW
936141 AD2-020 C 50/50 7.29 MW 7.29 MW
944931 AF1-158 C 50/50 1.45 MW 1.45 MW
944932 AF1-158 E 50/50 6.06 MW 6.06 MW
945111 AF1-176 C 50/50 17.78 MW 17.78 MW
945112 AF1-176 E 50/50 16.48 MW 16.48 MW
945502 AF1-215 E Adder 10.56 MW 8.97 MW
959141 AF2-205 C Adder 10.13 MW 8.61 MW
959142 AF2-205 E Adder 6.75 MW 5.74 MW
961051 AF2-396 C 50/50 23.29 MW 23.29 MW
939391 AE1-170 C 50/50 7.15 MW 7.15 MW
939392 AE1-170 E 50/50 9.87 MW 9.87 MW
940581 AE2-045 C Adder 7.04 MW 5.99 MW
940582 AE2-045 E Adder 9.67 MW 8.22 MW
962601 AG1-109 C 50/50 2.94 MW 2.94 MW
964401 AG1-302 C Adder 15.51 MW 13.18 MW
964402 AG1-302 E Adder 10.34 MW 8.79 MW
936142 AD2-020 E 50/50 4.49 MW 4.49 MW
957371 AF2-031 C Adder 0.67 MW 0.57 MW
957372 AF2-031 E Adder 1.0 MW 0.85 MW
957891 AF2-083 C 50/50 11.27 MW 11.27 MW
957892 AF2-083 E 50/50 5.64 MW 5.64 MW
958381 AF2-132 C Adder 15.51 MW 13.18 MW
958382 AF2-132 E Adder 10.34 MW 8.79 MW
958391 AF2-133 C Adder 15.3 MW 13.01 MW
958392 AF2-133 E Adder 10.2 MW 8.67 MW
958402 AF2-134 E Adder 3.52 MW 2.99 MW
964861 AG1-349 C Adder 13.39 MW 11.38 MW
964862 AG1-349 E Adder 8.92 MW 7.58 MW
965791 AG1-447 C Adder 4.8 MW 4.08 MW
939161 AE1-146 C Adder -9.08 MW -7.71 MW
943961 AF1-064 C Adder -7.63 MW -6.49 MW
955182 J996 G External Queue 27.58 MW 27.58 MW
990142 J1224 G External Queue 46.72 MW 46.72 MW
990152 J1226 External Queue 85.53 MW 85.53 MW
990527 J1329 G External Queue 5.52 MW 5.52 MW
991177 J1571 G External Queue 66.23 MW 66.23 MW
991182 J1586 G External Queue 63.3 MW 63.3 MW
991227 J1663 G External Queue 17.12 MW 17.12 MW
955782 J1062 G External Queue 59.26 MW 59.26 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 232.96 MW 232.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 27.98 MW 27.98 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 9.28 MW 9.28 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.29 MW 2.29 MW
NY PJM->LTFIMP_NY CLTF 1.41 MW 1.41 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.98 MW 1.98 MW
WEC LTFEXP_WEC->PJM CLTF 2.48 MW 2.48 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.43 MW 0.43 MW
TVA LTFEXP_TVA->PJM CLTF 4.16 MW 4.16 MW
MEC LTFEXP_MEC->PJM CLTF 10.05 MW 10.05 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.04 MW 6.04 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.45 MW 0.45 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 14.77 MW 14.77 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.21 MW 0.21 MW

Details for 19MON12-02LALLENDORF 345.0 kV Ckt 1 line l/o ATSI_P7-1_TE-345-025T_SRT-A-1_SENS


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area: ATSI/ITCT
Facility Description:
19MON12-02LALLENDORF 345.0 kV Ckt 1 line
264612 to 241901 ckt 1
Contingency Name:
ATSI_P7-1_TE-345-025T_SRT-A-1_SENS
CONTINGENCY 'ATSI_P7-1_TE-345-025T_SRT-A-1_SENS'
 DISCONNECT BRANCH FROM BUS 238889 TO BUS 264594 CKT 1   /*02LEMOYN     345.0 - 19LULU       345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 256583 CKT 1   /*19LULU       345.0 - 18MOROCCO    345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264613 CKT 1   /*19LULU       345.0 - 19MON34      345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264839 CKT 1   /*19LULU       345.0 - 19MILAN      345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 104.14 %
Rating: 1660.0 MVA
Rating Type: B
MVA to Mitigate: 1728.76 MVA
MW Contribution: 4.12 MW
Impact of Topology Modeling:
Addition
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
965681 AG1-436 C Adder 5.61 MW 4.77 MW
965682 AG1-436 E Adder 3.74 MW 3.18 MW
966431 AG1-512 C Adder 1.14 MW 0.96 MW
966432 AG1-512 E Adder 1.7 MW 1.45 MW
247528 05COVRT1 50/50 4.64 MW 4.64 MW
247529 05COVRT2 50/50 4.64 MW 4.64 MW
247530 05COVRT3 50/50 4.64 MW 4.64 MW
247531 05COVRT4 50/50 2.79 MW 2.79 MW
247532 05COVRT5 50/50 2.77 MW 2.77 MW
247533 05COVRT6 50/50 2.27 MW 2.27 MW
247966 05WTRV SLR E 50/50 0.25 MW 0.25 MW
247967 05OLIV SLR E Adder 0.21 MW 0.18 MW
247969 Z2-116 E Adder 0.12 MW 0.1 MW
910542 X3-005 E Adder 0.4 MW 0.34 MW
943001 AE2-323 C Adder 5.11 MW 4.34 MW
943002 AE2-323 E Adder 2.51 MW 2.13 MW
943021 AE2-325 C 50/50 3.15 MW 3.15 MW
943022 AE2-325 E 50/50 2.1 MW 2.1 MW
944161 AF1-084 C 50/50 5.55 MW 5.55 MW
944162 AF1-084 E 50/50 3.17 MW 3.17 MW
944961 AF1-161 C 50/50 2.51 MW 2.51 MW
945641 AF1-229 C Adder -7.25 MW -6.16 MW
960681 AF2-359 C Adder 5.61 MW 4.77 MW
960682 AF2-359 E Adder 3.74 MW 3.18 MW
960841 AF2-375 C Adder -7.25 MW -6.16 MW
960981 AF2-389 C Adder 2.89 MW 2.46 MW
960982 AF2-389 E Adder 1.93 MW 1.64 MW
243071 05BERRINSP G 50/50 0.05 MW 0.05 MW
244412 05WTRV SLR C 50/50 0.04 MW 0.04 MW
274675 JOLIET 29;7U Adder 37.59 MW 31.95 MW
274676 JOLIET 29;8U Adder 37.59 MW 31.95 MW
274687 WILL CNTY;4U Adder 34.99 MW 29.74 MW
274788 SE CHICAG;5U Adder 2.64 MW 2.25 MW
274789 SE CHICAG;6U Adder 2.64 MW 2.25 MW
274790 SE CHICAG;7U Adder 2.64 MW 2.25 MW
274791 SE CHICAG;8U Adder 2.64 MW 2.25 MW
274792 SE CHICAG;9U Adder 2.65 MW 2.25 MW
274793 SE CHICAG;0U Adder 2.65 MW 2.25 MW
274794 SE CHICAG;1U Adder 2.65 MW 2.25 MW
274795 SE CHICAG;2U Adder 2.65 MW 2.25 MW
933411 AC2-154 C Adder 1.31 MW 1.11 MW
933412 AC2-154 E Adder 2.14 MW 1.82 MW
941781 AE2-181 C Adder -2.72 MW -2.31 MW
247604 X1-042 50/50 0.07 MW 0.07 MW
275149 KELLYCK ;1E Adder 9.67 MW 8.22 MW
293519 PILOT HIL;1E Adder 9.67 MW 8.22 MW
936632 AD2-079 E O1 Adder 0.72 MW 0.62 MW
936141 AD2-020 C 50/50 6.22 MW 6.22 MW
936371 AD2-047 C Adder 2.35 MW 2.0 MW
936372 AD2-047 E Adder 11.47 MW 9.75 MW
936461 AD2-060 C Adder 1.38 MW 1.17 MW
944932 AF1-158 E Adder 5.19 MW 4.41 MW
945111 AF1-176 C Adder 15.19 MW 12.91 MW
945112 AF1-176 E Adder 14.08 MW 11.97 MW
945421 AF1-207 C Adder 2.36 MW 2.01 MW
945422 AF1-207 E Adder 10.16 MW 8.63 MW
945502 AF1-215 E Adder 9.05 MW 7.69 MW
959141 AF2-205 C Adder 8.69 MW 7.38 MW
959142 AF2-205 E Adder 5.79 MW 4.92 MW
960591 AF2-350 C Adder 4.14 MW 3.52 MW
960592 AF2-350 E Adder 2.76 MW 2.35 MW
961051 AF2-396 C Adder 19.89 MW 16.91 MW
961501 AF2-441 C Adder 5.67 MW 4.82 MW
961502 AF2-441 E Adder 8.5 MW 7.22 MW
939391 AE1-170 C Adder 6.1 MW 5.19 MW
939392 AE1-170 E Adder 8.43 MW 7.17 MW
940581 AE2-045 C Adder 6.04 MW 5.13 MW
940582 AE2-045 E Adder 8.29 MW 7.05 MW
962601 AG1-109 C 50/50 2.51 MW 2.51 MW
964401 AG1-302 C Adder 13.3 MW 11.3 MW
964402 AG1-302 E Adder 8.87 MW 7.54 MW
936142 AD2-020 E 50/50 3.83 MW 3.83 MW
957371 AF2-031 C Adder 0.57 MW 0.49 MW
957372 AF2-031 E Adder 0.86 MW 0.73 MW
957841 AF2-078 C Adder 8.35 MW 7.09 MW
957842 AF2-078 E Adder 5.56 MW 4.73 MW
957891 AF2-083 C Adder 9.63 MW 8.19 MW
957892 AF2-083 E Adder 4.82 MW 4.09 MW
958011 AF2-095 C Adder 5.97 MW 5.07 MW
958012 AF2-095 E Adder 3.98 MW 3.38 MW
958381 AF2-132 C Adder 13.3 MW 11.3 MW
958382 AF2-132 E Adder 8.87 MW 7.54 MW
958391 AF2-133 C Adder 13.12 MW 11.16 MW
958392 AF2-133 E Adder 8.75 MW 7.44 MW
958402 AF2-134 E Adder 3.02 MW 2.56 MW
964861 AG1-349 C Adder 11.48 MW 9.76 MW
964862 AG1-349 E Adder 7.65 MW 6.5 MW
965791 AG1-447 C Adder 4.12 MW 3.5 MW
939161 AE1-146 C Adder -6.96 MW -5.92 MW
943961 AF1-064 C Adder -3.65 MW -3.1 MW
990142 J1224 G External Queue 34.11 MW 34.11 MW
990527 J1329 G External Queue 4.03 MW 4.03 MW
991182 J1586 G External Queue 48.2 MW 48.2 MW
955782 J1062 G External Queue 39.23 MW 39.23 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 217.98 MW 217.98 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 24.24 MW 24.24 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 8.23 MW 8.23 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.0 MW 2.0 MW
NY PJM->LTFIMP_NY CLTF 1.23 MW 1.23 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.74 MW 1.74 MW
WEC LTFEXP_WEC->PJM CLTF 2.13 MW 2.13 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.39 MW 0.39 MW
TVA LTFEXP_TVA->PJM CLTF 3.62 MW 3.62 MW
MEC LTFEXP_MEC->PJM CLTF 8.66 MW 8.66 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.24 MW 5.24 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.39 MW 0.39 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 12.9 MW 12.9 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.19 MW 0.19 MW

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
AEP/OVEC 05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line
242865 to 248000 ckt Z1
AEP_P1-2_#709_546_SRT-A
CONTINGENCY 'AEP_P1-2_#709_546_SRT-A'
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
END
Single AC 116.44 % 2255.0 B 2625.64 5.73
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 104.99 % 971.0 B 1019.44 46.9
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 104.99 % 971.0 B 1019.44 46.9
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Breaker AC 150.27 % 971.0 B 1459.09 46.75
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Breaker AC 150.19 % 971.0 B 1458.35 46.9
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Breaker AC 150.19 % 971.0 B 1458.35 46.9
AEP/OVEC 05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line
242865 to 248000 ckt Z1
AEP_P4_#6189_05HANG R 765_D1_SRT-A
CONTINGENCY 'AEP_P4_#6189_05HANG R 765_D1_SRT-A'
 OPEN BRANCH FROM BUS 242921 TO BUS 242924 CKT 1   /*05CORNU      765.0 - 05HANG R     765.0
 OPEN BRANCH FROM BUS 242921 TO BUS 242934 CKT 1   /*05CORNU      765.0 - 05CORNU      345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
 REMOVE UNIT 1A FROM BUS 247245                    /*05HRKG1A      18.0
 REMOVE UNIT 1B FROM BUS 247246                    /*05HRKG1B      18.0
 REMOVE UNIT 1S FROM BUS 247247                    /*05HRKG1S      18.0
 REMOVE UNIT 2 FROM BUS 247249                     /*05HRKG2B      18.0
 REMOVE UNIT 2A FROM BUS 247248                    /*05HRKG2A      18.0
 REMOVE UNIT 2S FROM BUS 247250                    /*05HRKG2S      18.0
END
Breaker AC 128.54 % 2255.0 B 2898.49 5.72
AEP 05OLIVE-05NEW CARLI1 138.0 kV Ckt 1 line
243353 to 244930 ckt 1
AEP_P4_#9247_05OLIVE 138_R1_SRT-SL
CONTINGENCY 'AEP_P4_#9247_05OLIVE 138_R1_SRT-SL'
 OPEN BRANCH FROM BUS 243297 TO BUS 243352 CKT 1                /*05GERMAN     138.0 - 05NTRDAM     138.0
 OPEN BRANCH FROM BUS 243297 TO BUS 243353 CKT 1                /*05GERMAN     138.0 - 05OLIVE      138.0
 OPEN BRANCH FROM BUS 243353 TO BUS 244173 CKT 1                /*05OLIVE      138.0 - 05SILVER LAK 138.0
 REMOVE LOAD D5 FROM BUS 243353                                 /*05OLIVE      138.0
 SET POSTCONTRATING 337 BRANCH FROM BUS 243353 TO BUS 244930 CKT 1 /*05OLIVE      138.0 - 05NEW CARLI1 138.0
 SET PRECONTRATING 287 BRANCH FROM BUS 243353 TO BUS 244930 CKT 1 /*05OLIVE      138.0 - 05NEW CARLI1 138.0
END
Breaker AC 113.25 % 337.0 B 381.65 2.83
AEP 05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
AEP_P4_#7334_05JEFRSO 765_A2_SRT-A
CONTINGENCY 'AEP_P4_#7334_05JEFRSO 765_A2_SRT-A'
 OPEN BRANCH FROM BUS 242865 TO BUS 243208 CKT 2    /*05JEFRSO     345.0 - 05JEFRSO     765.0
 OPEN BRANCH FROM BUS 242865 TO BUS 248000 CKT Z1   /*05JEFRSO     345.0 - 06CLIFTY     345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1    /*05HANG R     765.0 - 05JEFRSO     765.0
END
Breaker AC 112.18 % 4142.0 B 4646.47 13.1
AEP 05SORENS-05MARYSV 765.0 kV Ckt 1 line
246999 to 242928 ckt 1
AEP_P4_#7334_05JEFRSO 765_A2_SRT-A
CONTINGENCY 'AEP_P4_#7334_05JEFRSO 765_A2_SRT-A'
 OPEN BRANCH FROM BUS 242865 TO BUS 243208 CKT 2    /*05JEFRSO     345.0 - 05JEFRSO     765.0
 OPEN BRANCH FROM BUS 242865 TO BUS 248000 CKT Z1   /*05JEFRSO     345.0 - 06CLIFTY     345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1    /*05HANG R     765.0 - 05JEFRSO     765.0
END
Breaker AC 103.54 % 4142.0 B 4288.52 14.39
AEP 05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
AEP_P4_#6189_05HANG R 765_D1_SRT-A
CONTINGENCY 'AEP_P4_#6189_05HANG R 765_D1_SRT-A'
 OPEN BRANCH FROM BUS 242921 TO BUS 242924 CKT 1   /*05CORNU      765.0 - 05HANG R     765.0
 OPEN BRANCH FROM BUS 242921 TO BUS 242934 CKT 1   /*05CORNU      765.0 - 05CORNU      345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
 REMOVE UNIT 1A FROM BUS 247245                    /*05HRKG1A      18.0
 REMOVE UNIT 1B FROM BUS 247246                    /*05HRKG1B      18.0
 REMOVE UNIT 1S FROM BUS 247247                    /*05HRKG1S      18.0
 REMOVE UNIT 2 FROM BUS 247249                     /*05HRKG2B      18.0
 REMOVE UNIT 2A FROM BUS 247248                    /*05HRKG2A      18.0
 REMOVE UNIT 2S FROM BUS 247250                    /*05HRKG2S      18.0
END
Breaker AC 101.0 % 4142.0 B 4183.58 11.82
ATSI/ITCT 19MON12-02LALLENDORF 345.0 kV Ckt 1 line
264612 to 241901 ckt 1
ATSI_P7-1_TE-345-025T_SRT-A-1
CONTINGENCY 'ATSI_P7-1_TE-345-025T_SRT-A-1'
 DISCONNECT BRANCH FROM BUS 238889 TO BUS 955780 CKT 1   /*02LEMOYN     345.0 - J1062 POI    345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 256583 CKT 1   /*19LULU       345.0 - 18MOROCCO    345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264613 CKT 1   /*19LULU       345.0 - 19MON34      345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264839 CKT 1   /*19LULU       345.0 - 19MILAN      345.0
END
Tower AC 114.87 % 1660.0 B 1906.81 4.5
ATSI/METC 18MOROCCO-02ALLEN 345.0 kV Ckt 1 line
256583 to 238530 ckt 1
ATSI_P7-1_TE-345-022T_SRT-A-1
CONTINGENCY 'ATSI_P7-1_TE-345-022T_SRT-A-1'
 DISCONNECT BRANCH FROM BUS 238889 TO BUS 955780 CKT 1   /*02LEMOYN     345.0 - J1062 POI    345.0
 DISCONNECT BRANCH FROM BUS 241901 TO BUS 264612 CKT 1   /*02LALLENDORF 345.0 - 19MON12      345.0
END
Tower AC 112.32 % 1793.0 B 2013.98 5.05
ATSI/METC 18MOROCCO-02ALLEN 345.0 kV Ckt 1 line
256583 to 238530 ckt 1
ATSI_P7-1_TE-345-022T_SRT-A-2
CONTINGENCY 'ATSI_P7-1_TE-345-022T_SRT-A-2'
 DISCONNECT BRANCH FROM BUS 241901 TO BUS 264612 CKT 1   /*02LALLENDORF 345.0 - 19MON12      345.0
 DISCONNECT BRANCH FROM BUS 264599 TO BUS 955780 CKT 1   /*19MAJTC      345.0 - J1062 POI    345.0
END
Tower AC 109.89 % 1793.0 B 1970.28 5.05
ATSI/ITCT J1062 POI-02LEMOYN 345.0 kV Ckt 1 line
955780 to 238889 ckt 1
ATSI_P7-1_TE-345-032T_SRT-A-1
CONTINGENCY 'ATSI_P7-1_TE-345-032T_SRT-A-1'
 OPEN BRANCH FROM BUS 241901 TO BUS 264612 CKT 1   /*02LALLENDORF 345.0 - 19MON12      345.0
 OPEN BRANCH FROM BUS 256583 TO BUS 264594 CKT 1   /*18MOROCCO    345.0 - 19LULU       345.0
 OPEN BRANCH FROM BUS 264594 TO BUS 264613 CKT 1   /*19LULU       345.0 - 19MON34      345.0
 OPEN BRANCH FROM BUS 264594 TO BUS 264839 CKT 1   /*19LULU       345.0 - 19MILAN      345.0
END
Tower AC 104.1 % 852.0 B 886.89 2.98
AEP 05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
AEP_P7-1_#11046___SRT-A
CONTINGENCY 'AEP_P7-1_#11046___SRT-A'
 OPEN BRANCH FROM BUS 243219 TO BUS 246955 CKT 1   /*05DUMONT     345.0 - 05OLIVE_BP   345.0
 OPEN BRANCH FROM BUS 243228 TO BUS 243234 CKT 1   /*05MERIDN     345.0 - 05TWIN B     345.0
 OPEN BRANCH FROM BUS 243232 TO BUS 246955 CKT 1   /*05SORENS     345.0 - 05OLIVE_BP   345.0
END
Tower AC 100.58 % 4142.0 B 4166.19 12.24

Details for 05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line l/o AEP_P1-2_#709_546_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/OVEC
Facility Description:
05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line
242865 to 248000 ckt Z1
Contingency Name:
AEP_P1-2_#709_546_SRT-A
CONTINGENCY 'AEP_P1-2_#709_546_SRT-A'
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 116.44 %
Rating: 2255.0 MVA
Rating Type: B
MVA to Mitigate: 2625.64 MVA
MW Contribution: 5.73 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
243353 05OLIVE 80/20 0.08 MW 0.08 MW
962781 AG1-127 C Adder 5.41 MW 4.59 MW
966841 AG1-555 C 80/20 11.45 MW 11.45 MW
965091 AG1-374 C Adder 17.23 MW 14.65 MW
965681 AG1-436 C 80/20 7.82 MW 7.82 MW
966091 AG1-478 C Adder 1.56 MW 1.33 MW
966431 AG1-512 C Adder 1.6 MW 1.36 MW
966441 AG1-513 C Adder 0.39 MW 0.33 MW
942111 AE2-223 C Adder 1.88 MW 1.6 MW
958481 AF2-142 C Adder 8.68 MW 7.38 MW
958491 AF2-143 C Adder 8.6 MW 7.31 MW
959341 AF2-225 C Adder 6.08 MW 5.16 MW
959351 AF2-226 C Adder 1.93 MW 1.64 MW
959611 AF2-252 C Adder 1.91 MW 1.63 MW
960281 AF2-319 C Adder 1.93 MW 1.64 MW
960611 AF2-352 C Adder 1.91 MW 1.63 MW
960681 AF2-359 C 80/20 7.82 MW 7.82 MW
960751 AF2-366 C Adder 5.39 MW 4.58 MW
243441 05CKG2 80/20 20.68 MW 20.68 MW
243442 05RKG1 80/20 67.03 MW 67.03 MW
243443 05RKG2 80/20 66.14 MW 66.14 MW
243859 05FR-11G C 80/20 0.54 MW 0.54 MW
243862 05FR-12G C 80/20 0.26 MW 0.26 MW
243864 05FR-21G C 80/20 0.27 MW 0.27 MW
243866 05FR-22G C 80/20 0.27 MW 0.27 MW
243870 05FR-3G C 80/20 0.26 MW 0.26 MW
243873 05FR-4G C 80/20 0.61 MW 0.61 MW
244415 05OLIV SLR C 80/20 0.04 MW 0.04 MW
274675 JOLIET 29;7U Adder 53.94 MW 45.85 MW
274676 JOLIET 29;8U Adder 53.94 MW 45.85 MW
274682 WAUKEGAN ;7U Adder 31.34 MW 26.64 MW
274683 WAUKEGAN ;8U Adder 33.81 MW 28.74 MW
274687 WILL CNTY;4U Adder 50.12 MW 42.6 MW
274752 CRETE EC ;2U 80/20 1.24 MW 1.24 MW
274753 CRETE EC ;3U 80/20 1.24 MW 1.24 MW
274754 CRETE EC ;4U 80/20 1.24 MW 1.24 MW
274771 LINCOLN ;2U 80/20 1.26 MW 1.26 MW
274772 LINCOLN ;3U 80/20 1.26 MW 1.26 MW
274773 LINCOLN ;4U 80/20 1.26 MW 1.26 MW
274774 LINCOLN ;5U 80/20 1.26 MW 1.26 MW
274775 LINCOLN ;6U 80/20 1.26 MW 1.26 MW
274776 LINCOLN ;7U 80/20 1.26 MW 1.26 MW
274777 LINCOLN ;8U 80/20 1.26 MW 1.26 MW
274788 SE CHICAG;5U Adder 3.71 MW 3.15 MW
274789 SE CHICAG;6U Adder 3.71 MW 3.15 MW
274790 SE CHICAG;7U Adder 3.71 MW 3.15 MW
274791 SE CHICAG;8U Adder 3.71 MW 3.15 MW
274792 SE CHICAG;9U 80/20 3.71 MW 3.71 MW
274793 SE CHICAG;0U 80/20 3.71 MW 3.71 MW
274794 SE CHICAG;1U 80/20 3.71 MW 3.71 MW
274795 SE CHICAG;2U 80/20 3.71 MW 3.71 MW
933411 AC2-154 C Adder 1.89 MW 1.6 MW
946581 AF1-322 C 80/20 11.11 MW 11.11 MW
957331 AF2-027 C Adder 1.9 MW 1.61 MW
274674 JOLIET 9 ;6U Adder 27.57 MW 23.44 MW
246909 05MDL-1G C 80/20 0.56 MW 0.56 MW
246910 05MDL-2G C 80/20 0.33 MW 0.33 MW
246976 05MDL-3G C 80/20 0.33 MW 0.33 MW
246979 05MDL-4G C 80/20 0.25 MW 0.25 MW
933441 AC2-157 C 80/20 12.82 MW 12.82 MW
938851 AE1-113 C Adder 6.29 MW 5.34 MW
934101 AD2-000 1 Adder 4.53 MW 3.85 MW
934111 AD2-000 2 Adder 4.53 MW 3.85 MW
270100 AB1-080 CT1 80/20 3.96 MW 3.96 MW
270101 AB1-080 CT2 80/20 3.96 MW 3.96 MW
270102 AB1-080 ST 80/20 4.28 MW 4.28 MW
247556 05MDL-5G 80/20 0.43 MW 0.43 MW
270180 AB1-006 W1 80/20 0.49 MW 0.49 MW
270181 AB1-006 W2 80/20 0.07 MW 0.07 MW
936371 AD2-047 C Adder 3.37 MW 2.87 MW
936461 AD2-060 C Adder 1.98 MW 1.69 MW
936511 AD2-066 C Adder 6.68 MW 5.68 MW
942421 AE2-255 C Adder 2.38 MW 2.02 MW
942521 AE2-267 C Adder -3.0 MW -2.55 MW
942601 AE2-276 C 80/20 8.44 MW 8.44 MW
942651 AE2-281 C Adder 0.67 MW 0.57 MW
943121 AE2-341 C Adder 9.74 MW 8.28 MW
943591 AF1-030 C Adder 6.48 MW 5.5 MW
945391 AF1-204 C 80/20 6.56 MW 6.56 MW
945421 AF1-207 C 80/20 4.53 MW 4.53 MW
945501 AF1-215 C 80/20 3.31 MW 3.31 MW
959141 AF2-205 C 80/20 15.2 MW 15.2 MW
960591 AF2-350 C Adder 5.95 MW 5.06 MW
961501 AF2-441 C Adder 8.0 MW 6.8 MW
930461 AB1-087 C 80/20 14.7 MW 14.7 MW
930471 AB1-088 C 80/20 14.47 MW 14.47 MW
939321 AE1-163 C Adder 4.68 MW 3.98 MW
939351 AE1-166 C Adder 7.74 MW 6.58 MW
939391 AE1-170 C Adder 5.94 MW 5.05 MW
939401 AE1-172 C Adder 4.41 MW 3.75 MW
939741 AE1-205 C Adder 8.1 MW 6.89 MW
940581 AE2-045 C 80/20 10.82 MW 10.82 MW
962691 AG1-118 C Adder 17.08 MW 14.52 MW
963741 AG1-226 C 80/20 16.97 MW 16.97 MW
963841 AG1-237 C 80/20 3.23 MW 3.23 MW
964401 AG1-302 C 80/20 22.18 MW 22.18 MW
941551 AE2-152 C Adder 8.94 MW 7.59 MW
941731 AE2-173 C Adder 4.82 MW 4.1 MW
957371 AF2-031 C Adder 0.8 MW 0.68 MW
957841 AF2-078 C 80/20 16.0 MW 16.0 MW
958011 AF2-095 C Adder 8.57 MW 7.29 MW
958381 AF2-132 C 80/20 22.18 MW 22.18 MW
958391 AF2-133 C 80/20 22.59 MW 22.59 MW
958401 AF2-134 C 80/20 1.1 MW 1.1 MW
964861 AG1-349 C 80/20 19.34 MW 19.34 MW
965791 AG1-447 C 80/20 5.73 MW 5.73 MW
274751 CRETE EC ;1U 80/20 1.24 MW 1.24 MW
274770 LINCOLN ;1U 80/20 1.26 MW 1.26 MW
957141 AF2-008 FTIR 80/20 84.36 MW 84.36 MW
944201 AF1-088 FTIR 80/20 168.72 MW 168.72 MW
990742 J1381 External Queue 20.02 MW 20.02 MW
991112 J1481 External Queue 20.02 MW 20.02 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 114.41 MW 114.41 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 18.27 MW 18.27 MW
NY PJM->LTFIMP_NY CLTF 1.03 MW 1.03 MW
WEC LTFEXP_WEC->PJM CLTF 3.02 MW 3.02 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 1.29 MW 1.29 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.79 MW 0.79 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 10.29 MW 10.29 MW
MEC LTFEXP_MEC->PJM CLTF 11.45 MW 11.45 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 29.46 MW 29.46 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.75 MW 1.75 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.71 MW 1.71 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 104.99 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1019.44 MVA
MW Contribution: 46.9 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.94 MW 5.05 MW
965681 AG1-436 C 80/20 63.95 MW 63.95 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966431 AG1-512 C 80/20 3.81 MW 3.81 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
958481 AF2-142 C 80/20 10.28 MW 10.28 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960681 AF2-359 C 80/20 63.95 MW 63.95 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
274654 BRAIDWOOD;1U 80/20 22.27 MW 22.27 MW
274655 BRAIDWOOD;2U 80/20 21.78 MW 21.78 MW
274660 LASCO STA;1U 80/20 20.81 MW 20.81 MW
274661 LASCO STA;2U 80/20 20.88 MW 20.88 MW
274675 JOLIET 29;7U 80/20 62.32 MW 62.32 MW
274676 JOLIET 29;8U 80/20 62.29 MW 62.29 MW
274682 WAUKEGAN ;7U Adder 35.09 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.83 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274799 UNIV PARK;2U 80/20 0.98 MW 0.98 MW
274800 UNIV PARK;3U 80/20 0.98 MW 0.98 MW
274801 UNIV PARK;4U 80/20 0.98 MW 0.98 MW
274802 UNIV PARK;5U 80/20 1.28 MW 1.28 MW
274803 UNIV PARK;6U 80/20 1.28 MW 1.28 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
939061 AE1-134 2 Adder 1.15 MW 0.98 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.32 MW
270839 OTTER CRK; R 80/20 0.36 MW 0.36 MW
274708 KENDALL ;3C 80/20 3.4 MW 3.4 MW
274709 KENDALL ;3S 80/20 2.25 MW 2.25 MW
274710 KENDALL ;4C 80/20 3.37 MW 3.37 MW
274711 KENDALL ;4S 80/20 2.25 MW 2.25 MW
276640 AC1-204 GEN1 80/20 10.16 MW 10.16 MW
276642 AC1-204 GEN2 80/20 10.15 MW 10.15 MW
274805 UNIV PK N;1U 80/20 1.91 MW 1.91 MW
274806 UNIV PK N;2U 80/20 1.89 MW 1.89 MW
274807 UNIV PK N;3U 80/20 1.93 MW 1.93 MW
274808 UNIV PK N;4U 80/20 1.92 MW 1.92 MW
274809 UNIV PK N;5U 80/20 1.9 MW 1.9 MW
274810 UNIV PK N;6U 80/20 1.92 MW 1.92 MW
274811 UNIV PK N;7U 80/20 1.93 MW 1.93 MW
274812 UNIV PK N;8U 80/20 1.91 MW 1.91 MW
274813 UNIV PK N;9U 80/20 1.91 MW 1.91 MW
274814 UNIV PK N;0U 80/20 1.9 MW 1.9 MW
274815 UNIV PK N;XU 80/20 1.91 MW 1.91 MW
274816 UNIV PK N;YU 80/20 1.93 MW 1.93 MW
926821 AC1-168 C Adder 0.96 MW 0.82 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
961011 AF2-392 C Adder 3.34 MW 2.84 MW
930481 AB1-089 C Adder 55.51 MW 47.18 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
965791 AG1-447 C 80/20 46.9 MW 46.9 MW
274798 UNIV PARK;1U 80/20 0.98 MW 0.98 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.52 MW 69.52 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.78 MW 11.78 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.52 MW 0.52 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.84 MW 2.84 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 104.99 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1019.44 MVA
MW Contribution: 46.9 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
962781 AG1-127 C Adder 5.94 MW 5.05 MW
965681 AG1-436 C 80/20 63.95 MW 63.95 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966431 AG1-512 C 80/20 3.81 MW 3.81 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
958481 AF2-142 C 80/20 10.28 MW 10.28 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960681 AF2-359 C 80/20 63.95 MW 63.95 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
274654 BRAIDWOOD;1U 80/20 22.27 MW 22.27 MW
274655 BRAIDWOOD;2U 80/20 21.78 MW 21.78 MW
274660 LASCO STA;1U 80/20 20.81 MW 20.81 MW
274661 LASCO STA;2U 80/20 20.88 MW 20.88 MW
274675 JOLIET 29;7U 80/20 62.32 MW 62.32 MW
274676 JOLIET 29;8U 80/20 62.29 MW 62.29 MW
274682 WAUKEGAN ;7U Adder 35.09 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.83 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274799 UNIV PARK;2U 80/20 0.98 MW 0.98 MW
274800 UNIV PARK;3U 80/20 0.98 MW 0.98 MW
274801 UNIV PARK;4U 80/20 0.98 MW 0.98 MW
274802 UNIV PARK;5U 80/20 1.28 MW 1.28 MW
274803 UNIV PARK;6U 80/20 1.28 MW 1.28 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
939061 AE1-134 2 Adder 1.15 MW 0.98 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.32 MW
270839 OTTER CRK; R 80/20 0.36 MW 0.36 MW
274708 KENDALL ;3C 80/20 3.4 MW 3.4 MW
274709 KENDALL ;3S 80/20 2.25 MW 2.25 MW
274710 KENDALL ;4C 80/20 3.37 MW 3.37 MW
274711 KENDALL ;4S 80/20 2.25 MW 2.25 MW
276640 AC1-204 GEN1 80/20 10.16 MW 10.16 MW
276642 AC1-204 GEN2 80/20 10.15 MW 10.15 MW
274805 UNIV PK N;1U 80/20 1.91 MW 1.91 MW
274806 UNIV PK N;2U 80/20 1.89 MW 1.89 MW
274807 UNIV PK N;3U 80/20 1.93 MW 1.93 MW
274808 UNIV PK N;4U 80/20 1.92 MW 1.92 MW
274809 UNIV PK N;5U 80/20 1.9 MW 1.9 MW
274810 UNIV PK N;6U 80/20 1.92 MW 1.92 MW
274811 UNIV PK N;7U 80/20 1.93 MW 1.93 MW
274812 UNIV PK N;8U 80/20 1.91 MW 1.91 MW
274813 UNIV PK N;9U 80/20 1.91 MW 1.91 MW
274814 UNIV PK N;0U 80/20 1.9 MW 1.9 MW
274815 UNIV PK N;XU 80/20 1.91 MW 1.91 MW
274816 UNIV PK N;YU 80/20 1.93 MW 1.93 MW
926821 AC1-168 C Adder 0.96 MW 0.82 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
961011 AF2-392 C Adder 3.34 MW 2.84 MW
930481 AB1-089 C Adder 55.51 MW 47.18 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
965791 AG1-447 C 80/20 46.9 MW 46.9 MW
274798 UNIV PARK;1U 80/20 0.98 MW 0.98 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.52 MW 69.52 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.78 MW 11.78 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.52 MW 0.52 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.84 MW 2.84 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o AEP_P4_#2978_05DUMONT 765_B_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
AEP_P4_#2978_05DUMONT 765_B_SRT-A
CONTINGENCY 'AEP_P4_#2978_05DUMONT 765_B_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 243207 CKT 1   /*05DUMONT     765.0 - 05GRNTWN     765.0
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 150.27 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1459.09 MVA
MW Contribution: 46.75 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.21 MW 1.88 MW
962781 AG1-127 C Adder 5.9 MW 5.01 MW
962782 AG1-127 E Adder 3.92 MW 3.34 MW
965681 AG1-436 C 50/50 63.75 MW 63.75 MW
965682 AG1-436 E 50/50 42.5 MW 42.5 MW
966091 AG1-478 C Adder 1.76 MW 1.49 MW
966092 AG1-478 E Adder 0.44 MW 0.38 MW
966431 AG1-512 C Adder 3.79 MW 3.22 MW
966432 AG1-512 E Adder 5.69 MW 4.83 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
966442 AG1-513 E Adder 0.64 MW 0.55 MW
290021 O50 E Adder 16.24 MW 13.81 MW
290051 GSG-6; E Adder 8.81 MW 7.49 MW
295109 WESTBROOK E Adder 4.72 MW 4.01 MW
295111 SUBLETTE E Adder 2.29 MW 1.95 MW
918052 AA1-018 E OP Adder 14.8 MW 12.58 MW
933911 AD1-013 C Adder 1.55 MW 1.32 MW
933912 AD1-013 E Adder 2.48 MW 2.11 MW
934722 AD1-100 E Adder 76.16 MW 64.74 MW
937002 AD2-134 E Adder 8.52 MW 7.24 MW
937312 AD2-172 E Adder 2.85 MW 2.42 MW
942991 AE2-321 C Adder 6.87 MW 5.84 MW
942992 AE2-321 E Adder 3.38 MW 2.88 MW
958481 AF2-142 C Adder 10.2 MW 8.67 MW
958482 AF2-142 E Adder 6.8 MW 5.78 MW
958491 AF2-143 C Adder 9.74 MW 8.28 MW
958492 AF2-143 E Adder 6.49 MW 5.52 MW
958912 AF2-182 E Adder 28.63 MW 24.33 MW
959081 AF2-199 C Adder 5.99 MW 5.09 MW
959082 AF2-199 E Adder 2.99 MW 2.54 MW
959351 AF2-226 C Adder 2.01 MW 1.71 MW
959352 AF2-226 E Adder 3.02 MW 2.56 MW
960281 AF2-319 C Adder 2.01 MW 1.71 MW
960282 AF2-319 E Adder 3.02 MW 2.56 MW
960582 AF2-349 E Adder 30.48 MW 25.91 MW
960681 AF2-359 C 50/50 63.75 MW 63.75 MW
960682 AF2-359 E 50/50 42.5 MW 42.5 MW
960751 AF2-366 C Adder 5.88 MW 5.0 MW
960752 AF2-366 E Adder 3.92 MW 3.33 MW
274675 JOLIET 29;7U Adder 61.79 MW 52.52 MW
274676 JOLIET 29;8U Adder 61.77 MW 52.5 MW
274682 WAUKEGAN ;7U Adder 34.82 MW 29.6 MW
274683 WAUKEGAN ;8U Adder 37.55 MW 31.91 MW
274687 WILL CNTY;4U Adder 55.58 MW 47.24 MW
274859 EASYR;U1 E Adder 10.07 MW 8.56 MW
274860 EASYR;U2 E Adder 10.07 MW 8.56 MW
276591 L-013 2 Adder 3.09 MW 2.63 MW
293061 N-015 E Adder 13.1 MW 11.14 MW
293644 O22 E1 Adder 11.55 MW 9.82 MW
293645 O22 E2 Adder 13.23 MW 11.25 MW
294392 P-010 E Adder 16.64 MW 14.14 MW
294763 P-046 E Adder 7.91 MW 6.72 MW
933411 AC2-154 C Adder 2.1 MW 1.79 MW
933412 AC2-154 E Adder 3.43 MW 2.92 MW
940502 AE2-035 E Adder 2.85 MW 2.42 MW
957331 AF2-027 C Adder 2.1 MW 1.79 MW
957332 AF2-027 E Adder 3.16 MW 2.68 MW
957471 AF2-041 C Adder 17.96 MW 15.26 MW
957472 AF2-041 E Adder 8.98 MW 7.63 MW
274674 JOLIET 9 ;6U Adder 31.03 MW 26.38 MW
274890 CAYUG;1U E Adder 3.17 MW 2.7 MW
938851 AE1-113 C Adder 6.7 MW 5.7 MW
938852 AE1-113 E Adder 23.76 MW 20.19 MW
934101 AD2-000 1 Adder 4.88 MW 4.15 MW
934111 AD2-000 2 Adder 5.05 MW 4.29 MW
275149 KELLYCK ;1E Adder 15.49 MW 13.16 MW
293519 PILOT HIL;1E Adder 15.49 MW 13.16 MW
290108 LEEDK;1U E Adder 20.22 MW 17.18 MW
916221 Z1-073 E Adder 6.21 MW 5.28 MW
274805 UNIV PK N;1U 50/50 1.9 MW 1.9 MW
274807 UNIV PK N;3U 50/50 1.92 MW 1.92 MW
274808 UNIV PK N;4U 50/50 1.91 MW 1.91 MW
274810 UNIV PK N;6U 50/50 1.91 MW 1.91 MW
274811 UNIV PK N;7U 50/50 1.92 MW 1.92 MW
274812 UNIV PK N;8U 50/50 1.9 MW 1.9 MW
274813 UNIV PK N;9U 50/50 1.9 MW 1.9 MW
274814 UNIV PK N;0U 50/50 1.89 MW 1.89 MW
274815 UNIV PK N;XU 50/50 1.9 MW 1.9 MW
274816 UNIV PK N;YU 50/50 1.92 MW 1.92 MW
936292 AD2-038 E Adder 13.38 MW 11.37 MW
936371 AD2-047 C Adder 3.76 MW 3.2 MW
936372 AD2-047 E Adder 18.37 MW 15.61 MW
936461 AD2-060 C Adder 2.21 MW 1.88 MW
936511 AD2-066 C Adder 7.13 MW 6.06 MW
936512 AD2-066 E Adder 4.75 MW 4.04 MW
942421 AE2-255 C Adder 2.54 MW 2.16 MW
942422 AE2-255 E Adder 7.61 MW 6.47 MW
942651 AE2-281 C Adder 0.76 MW 0.64 MW
942652 AE2-281 E Adder 4.65 MW 3.96 MW
943121 AE2-341 C Adder 10.77 MW 9.16 MW
943122 AE2-341 E Adder 5.29 MW 4.5 MW
943591 AF1-030 C Adder 7.16 MW 6.09 MW
943592 AF1-030 E Adder 3.54 MW 3.01 MW
959091 AF2-200 C Adder 11.97 MW 10.18 MW
959092 AF2-200 E Adder 7.98 MW 6.78 MW
960591 AF2-350 C Adder 6.64 MW 5.64 MW
960592 AF2-350 E Adder 4.42 MW 3.76 MW
930481 AB1-089 C Adder 55.14 MW 46.87 MW
930482 AB1-089 E Adder 2.51 MW 2.13 MW
938861 AE1-114 C Adder 3.3 MW 2.8 MW
938862 AE1-114 E Adder 11.24 MW 9.56 MW
939321 AE1-163 C Adder 5.3 MW 4.51 MW
939322 AE1-163 E Adder 32.57 MW 27.69 MW
939351 AE1-166 C Adder 8.49 MW 7.21 MW
939352 AE1-166 E Adder 7.83 MW 6.66 MW
939401 AE1-172 C Adder 4.45 MW 3.78 MW
939402 AE1-172 E Adder 20.84 MW 17.71 MW
946152 AF1-280 E Adder 19.08 MW 16.22 MW
946671 AF1-331 C Adder 2.01 MW 1.71 MW
962691 AG1-118 C Adder 18.68 MW 15.87 MW
962692 AG1-118 E Adder 12.45 MW 10.58 MW
941551 AE2-152 C Adder 9.79 MW 8.32 MW
941552 AE2-152 E Adder 6.53 MW 5.55 MW
958011 AF2-095 C Adder 9.56 MW 8.12 MW
958012 AF2-095 E Adder 6.37 MW 5.42 MW
965791 AG1-447 C 50/50 46.75 MW 46.75 MW
276675 AE2-062 E Adder 0.13 MW 0.11 MW
276170 Z1-108 E Adder 2.47 MW 2.1 MW
920272 AA2-123 E Adder 2.42 MW 2.06 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 68.23 MW 68.23 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 12.47 MW 12.47 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.73 MW 1.73 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.29 MW 3.29 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.41 MW 0.41 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.21 MW 0.21 MW
TVA LTFEXP_TVA->PJM CLTF 1.17 MW 1.17 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.41 MW 0.41 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.17 MW 1.17 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.99 MW 2.99 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 11.09 MW 11.09 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.61 MW 0.61 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT3-4___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 150.19 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1458.35 MVA
MW Contribution: 46.9 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.23 MW 1.9 MW
962781 AG1-127 C Adder 5.94 MW 5.05 MW
962782 AG1-127 E Adder 3.95 MW 3.36 MW
965681 AG1-436 C 50/50 63.95 MW 63.95 MW
965682 AG1-436 E 50/50 42.63 MW 42.63 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966092 AG1-478 E Adder 0.44 MW 0.38 MW
966431 AG1-512 C Adder 3.81 MW 3.24 MW
966432 AG1-512 E Adder 5.72 MW 4.86 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
966442 AG1-513 E Adder 0.65 MW 0.55 MW
290021 O50 E Adder 16.36 MW 13.9 MW
290051 GSG-6; E Adder 8.87 MW 7.54 MW
295109 WESTBROOK E Adder 4.75 MW 4.04 MW
295111 SUBLETTE E Adder 2.31 MW 1.96 MW
910542 X3-005 E Adder 0.54 MW 0.46 MW
918052 AA1-018 E OP Adder 14.9 MW 12.67 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
933912 AD1-013 E Adder 2.49 MW 2.12 MW
934722 AD1-100 E Adder 76.78 MW 65.27 MW
937002 AD2-134 E Adder 8.58 MW 7.29 MW
937312 AD2-172 E Adder 2.86 MW 2.44 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
942992 AE2-321 E Adder 3.41 MW 2.9 MW
958481 AF2-142 C Adder 10.28 MW 8.74 MW
958482 AF2-142 E Adder 6.85 MW 5.82 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
958492 AF2-143 E Adder 6.54 MW 5.56 MW
958912 AF2-182 E Adder 28.8 MW 24.48 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959082 AF2-199 E Adder 3.01 MW 2.56 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
959352 AF2-226 E Adder 3.04 MW 2.58 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960282 AF2-319 E Adder 3.04 MW 2.58 MW
960582 AF2-349 E Adder 30.7 MW 26.09 MW
960681 AF2-359 C 50/50 63.95 MW 63.95 MW
960682 AF2-359 E 50/50 42.63 MW 42.63 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
960752 AF2-366 E Adder 3.95 MW 3.36 MW
274675 JOLIET 29;7U Adder 62.32 MW 52.97 MW
274676 JOLIET 29;8U Adder 62.3 MW 52.95 MW
274682 WAUKEGAN ;7U Adder 35.1 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.84 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274859 EASYR;U1 E Adder 10.13 MW 8.61 MW
274860 EASYR;U2 E Adder 10.13 MW 8.61 MW
276591 L-013 2 Adder 3.12 MW 2.65 MW
293061 N-015 E Adder 13.2 MW 11.22 MW
293644 O22 E1 Adder 11.65 MW 9.9 MW
293645 O22 E2 Adder 13.34 MW 11.34 MW
294392 P-010 E Adder 16.77 MW 14.25 MW
294763 P-046 E Adder 7.96 MW 6.77 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
933412 AC2-154 E Adder 3.46 MW 2.94 MW
940502 AE2-035 E Adder 2.86 MW 2.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957332 AF2-027 E Adder 3.18 MW 2.71 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
957472 AF2-041 E Adder 9.04 MW 7.68 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
274891 CAYUG;2U E Adder 2.65 MW 2.26 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
938852 AE1-113 E Adder 23.92 MW 20.33 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.33 MW
275149 KELLYCK ;1E Adder 15.63 MW 13.29 MW
293519 PILOT HIL;1E Adder 15.63 MW 13.29 MW
290108 LEEDK;1U E Adder 20.36 MW 17.31 MW
916221 Z1-073 E Adder 6.25 MW 5.31 MW
274805 UNIV PK N;1U 50/50 1.91 MW 1.91 MW
274807 UNIV PK N;3U 50/50 1.93 MW 1.93 MW
274808 UNIV PK N;4U 50/50 1.92 MW 1.92 MW
274810 UNIV PK N;6U 50/50 1.92 MW 1.92 MW
274811 UNIV PK N;7U 50/50 1.93 MW 1.93 MW
274812 UNIV PK N;8U 50/50 1.91 MW 1.91 MW
274813 UNIV PK N;9U 50/50 1.91 MW 1.91 MW
274814 UNIV PK N;0U 50/50 1.9 MW 1.9 MW
274815 UNIV PK N;XU 50/50 1.91 MW 1.91 MW
274816 UNIV PK N;YU 50/50 1.93 MW 1.93 MW
936292 AD2-038 E Adder 13.47 MW 11.45 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936372 AD2-047 E Adder 18.53 MW 15.75 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
936512 AD2-066 E Adder 4.79 MW 4.07 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942422 AE2-255 E Adder 7.67 MW 6.52 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
942652 AE2-281 E Adder 4.68 MW 3.98 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943122 AE2-341 E Adder 5.33 MW 4.53 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
943592 AF1-030 E Adder 3.57 MW 3.04 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959092 AF2-200 E Adder 8.04 MW 6.83 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960592 AF2-350 E Adder 4.47 MW 3.8 MW
930481 AB1-089 C Adder 55.52 MW 47.19 MW
930482 AB1-089 E Adder 2.52 MW 2.15 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
938862 AE1-114 E Adder 11.32 MW 9.62 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939322 AE1-163 E Adder 32.8 MW 27.88 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939352 AE1-166 E Adder 7.9 MW 6.71 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
939402 AE1-172 E Adder 20.96 MW 17.82 MW
946152 AF1-280 E Adder 19.2 MW 16.32 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962692 AG1-118 E Adder 12.54 MW 10.66 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
941552 AE2-152 E Adder 6.58 MW 5.59 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
958012 AF2-095 E Adder 6.43 MW 5.47 MW
965791 AG1-447 C 50/50 46.9 MW 46.9 MW
276675 AE2-062 E Adder 0.14 MW 0.12 MW
276170 Z1-108 E Adder 2.49 MW 2.11 MW
920272 AA2-123 E Adder 2.44 MW 2.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.53 MW 69.53 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.79 MW 11.79 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.74 MW 1.74 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.85 MW 2.85 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 11.14 MW 11.14 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT4-5___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 150.19 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1458.35 MVA
MW Contribution: 46.9 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 2.23 MW 1.9 MW
962781 AG1-127 C Adder 5.94 MW 5.05 MW
962782 AG1-127 E Adder 3.95 MW 3.36 MW
965681 AG1-436 C 50/50 63.95 MW 63.95 MW
965682 AG1-436 E 50/50 42.63 MW 42.63 MW
966091 AG1-478 C Adder 1.77 MW 1.5 MW
966092 AG1-478 E Adder 0.44 MW 0.38 MW
966431 AG1-512 C Adder 3.81 MW 3.24 MW
966432 AG1-512 E Adder 5.72 MW 4.86 MW
966441 AG1-513 C Adder 0.43 MW 0.37 MW
966442 AG1-513 E Adder 0.65 MW 0.55 MW
290021 O50 E Adder 16.36 MW 13.9 MW
290051 GSG-6; E Adder 8.87 MW 7.54 MW
295109 WESTBROOK E Adder 4.75 MW 4.04 MW
295111 SUBLETTE E Adder 2.31 MW 1.96 MW
910542 X3-005 E Adder 0.54 MW 0.46 MW
918052 AA1-018 E OP Adder 14.9 MW 12.67 MW
933911 AD1-013 C Adder 1.56 MW 1.33 MW
933912 AD1-013 E Adder 2.49 MW 2.12 MW
934722 AD1-100 E Adder 76.78 MW 65.27 MW
937002 AD2-134 E Adder 8.58 MW 7.29 MW
937312 AD2-172 E Adder 2.86 MW 2.44 MW
942991 AE2-321 C Adder 6.92 MW 5.88 MW
942992 AE2-321 E Adder 3.41 MW 2.9 MW
958481 AF2-142 C Adder 10.28 MW 8.74 MW
958482 AF2-142 E Adder 6.85 MW 5.82 MW
958491 AF2-143 C Adder 9.81 MW 8.34 MW
958492 AF2-143 E Adder 6.54 MW 5.56 MW
958912 AF2-182 E Adder 28.8 MW 24.48 MW
959081 AF2-199 C Adder 6.03 MW 5.12 MW
959082 AF2-199 E Adder 3.01 MW 2.56 MW
959351 AF2-226 C Adder 2.03 MW 1.72 MW
959352 AF2-226 E Adder 3.04 MW 2.58 MW
960281 AF2-319 C Adder 2.03 MW 1.72 MW
960282 AF2-319 E Adder 3.04 MW 2.58 MW
960582 AF2-349 E Adder 30.7 MW 26.09 MW
960681 AF2-359 C 50/50 63.95 MW 63.95 MW
960682 AF2-359 E 50/50 42.63 MW 42.63 MW
960751 AF2-366 C Adder 5.92 MW 5.04 MW
960752 AF2-366 E Adder 3.95 MW 3.36 MW
274675 JOLIET 29;7U Adder 62.32 MW 52.97 MW
274676 JOLIET 29;8U Adder 62.3 MW 52.95 MW
274682 WAUKEGAN ;7U Adder 35.1 MW 29.83 MW
274683 WAUKEGAN ;8U Adder 37.84 MW 32.16 MW
274687 WILL CNTY;4U Adder 56.08 MW 47.67 MW
274859 EASYR;U1 E Adder 10.13 MW 8.61 MW
274860 EASYR;U2 E Adder 10.13 MW 8.61 MW
276591 L-013 2 Adder 3.12 MW 2.65 MW
293061 N-015 E Adder 13.2 MW 11.22 MW
293644 O22 E1 Adder 11.65 MW 9.9 MW
293645 O22 E2 Adder 13.34 MW 11.34 MW
294392 P-010 E Adder 16.77 MW 14.25 MW
294763 P-046 E Adder 7.96 MW 6.77 MW
933411 AC2-154 C Adder 2.12 MW 1.8 MW
933412 AC2-154 E Adder 3.46 MW 2.94 MW
940502 AE2-035 E Adder 2.86 MW 2.44 MW
957331 AF2-027 C Adder 2.12 MW 1.8 MW
957332 AF2-027 E Adder 3.18 MW 2.71 MW
957471 AF2-041 C Adder 18.08 MW 15.37 MW
957472 AF2-041 E Adder 9.04 MW 7.68 MW
274674 JOLIET 9 ;6U Adder 31.3 MW 26.6 MW
274891 CAYUG;2U E Adder 2.65 MW 2.26 MW
938851 AE1-113 C Adder 6.75 MW 5.73 MW
938852 AE1-113 E Adder 23.92 MW 20.33 MW
934101 AD2-000 1 Adder 4.91 MW 4.18 MW
934111 AD2-000 2 Adder 5.09 MW 4.33 MW
275149 KELLYCK ;1E Adder 15.63 MW 13.29 MW
293519 PILOT HIL;1E Adder 15.63 MW 13.29 MW
290108 LEEDK;1U E Adder 20.36 MW 17.31 MW
916221 Z1-073 E Adder 6.25 MW 5.31 MW
274805 UNIV PK N;1U 50/50 1.91 MW 1.91 MW
274807 UNIV PK N;3U 50/50 1.93 MW 1.93 MW
274808 UNIV PK N;4U 50/50 1.92 MW 1.92 MW
274810 UNIV PK N;6U 50/50 1.92 MW 1.92 MW
274811 UNIV PK N;7U 50/50 1.93 MW 1.93 MW
274812 UNIV PK N;8U 50/50 1.91 MW 1.91 MW
274813 UNIV PK N;9U 50/50 1.91 MW 1.91 MW
274814 UNIV PK N;0U 50/50 1.9 MW 1.9 MW
274815 UNIV PK N;XU 50/50 1.91 MW 1.91 MW
274816 UNIV PK N;YU 50/50 1.93 MW 1.93 MW
936292 AD2-038 E Adder 13.47 MW 11.45 MW
936371 AD2-047 C Adder 3.8 MW 3.23 MW
936372 AD2-047 E Adder 18.53 MW 15.75 MW
936461 AD2-060 C Adder 2.23 MW 1.9 MW
936511 AD2-066 C Adder 7.18 MW 6.1 MW
936512 AD2-066 E Adder 4.79 MW 4.07 MW
942421 AE2-255 C Adder 2.56 MW 2.17 MW
942422 AE2-255 E Adder 7.67 MW 6.52 MW
942651 AE2-281 C Adder 0.76 MW 0.65 MW
942652 AE2-281 E Adder 4.68 MW 3.98 MW
943121 AE2-341 C Adder 10.86 MW 9.23 MW
943122 AE2-341 E Adder 5.33 MW 4.53 MW
943591 AF1-030 C Adder 7.22 MW 6.14 MW
943592 AF1-030 E Adder 3.57 MW 3.04 MW
959091 AF2-200 C Adder 12.05 MW 10.24 MW
959092 AF2-200 E Adder 8.04 MW 6.83 MW
960591 AF2-350 C Adder 6.7 MW 5.69 MW
960592 AF2-350 E Adder 4.47 MW 3.8 MW
930481 AB1-089 C Adder 55.52 MW 47.19 MW
930482 AB1-089 E Adder 2.52 MW 2.15 MW
938861 AE1-114 C Adder 3.32 MW 2.82 MW
938862 AE1-114 E Adder 11.32 MW 9.62 MW
939321 AE1-163 C Adder 5.34 MW 4.54 MW
939322 AE1-163 E Adder 32.8 MW 27.88 MW
939351 AE1-166 C Adder 8.56 MW 7.27 MW
939352 AE1-166 E Adder 7.9 MW 6.71 MW
939401 AE1-172 C Adder 4.48 MW 3.81 MW
939402 AE1-172 E Adder 20.97 MW 17.82 MW
946152 AF1-280 E Adder 19.2 MW 16.32 MW
946671 AF1-331 C Adder 2.03 MW 1.72 MW
962691 AG1-118 C Adder 18.81 MW 15.99 MW
962692 AG1-118 E Adder 12.54 MW 10.66 MW
941551 AE2-152 C Adder 9.87 MW 8.39 MW
941552 AE2-152 E Adder 6.58 MW 5.59 MW
958011 AF2-095 C Adder 9.65 MW 8.2 MW
958012 AF2-095 E Adder 6.43 MW 5.47 MW
965791 AG1-447 C 50/50 46.9 MW 46.9 MW
276675 AE2-062 E Adder 0.14 MW 0.12 MW
276170 Z1-108 E Adder 2.49 MW 2.11 MW
920272 AA2-123 E Adder 2.44 MW 2.07 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 69.53 MW 69.53 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 11.79 MW 11.79 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.74 MW 1.74 MW
NY PJM->LTFIMP_NY CLTF 0.93 MW 0.93 MW
WEC LTFEXP_WEC->PJM CLTF 3.31 MW 3.31 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.45 MW 0.45 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.23 MW 0.23 MW
TVA LTFEXP_TVA->PJM CLTF 1.03 MW 1.03 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 0.53 MW 0.53 MW
MEC LTFEXP_MEC->PJM CLTF 10.92 MW 10.92 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 1.52 MW 1.52 MW
LAGN LTFEXP_LAGN->PJM CLTF 2.85 MW 2.85 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 11.14 MW 11.14 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 0.65 MW 0.65 MW

Details for 05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line l/o AEP_P4_#6189_05HANG R 765_D1_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/OVEC
Facility Description:
05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line
242865 to 248000 ckt Z1
Contingency Name:
AEP_P4_#6189_05HANG R 765_D1_SRT-A
CONTINGENCY 'AEP_P4_#6189_05HANG R 765_D1_SRT-A'
 OPEN BRANCH FROM BUS 242921 TO BUS 242924 CKT 1   /*05CORNU      765.0 - 05HANG R     765.0
 OPEN BRANCH FROM BUS 242921 TO BUS 242934 CKT 1   /*05CORNU      765.0 - 05CORNU      345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
 REMOVE UNIT 1A FROM BUS 247245                    /*05HRKG1A      18.0
 REMOVE UNIT 1B FROM BUS 247246                    /*05HRKG1B      18.0
 REMOVE UNIT 1S FROM BUS 247247                    /*05HRKG1S      18.0
 REMOVE UNIT 2 FROM BUS 247249                     /*05HRKG2B      18.0
 REMOVE UNIT 2A FROM BUS 247248                    /*05HRKG2A      18.0
 REMOVE UNIT 2S FROM BUS 247250                    /*05HRKG2S      18.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 128.54 %
Rating: 2255.0 MVA
Rating Type: B
MVA to Mitigate: 2898.49 MVA
MW Contribution: 5.72 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
966841 AG1-555 C 50/50 11.42 MW 11.42 MW
966842 AG1-555 E 50/50 4.08 MW 4.08 MW
965681 AG1-436 C 50/50 7.8 MW 7.8 MW
965682 AG1-436 E 50/50 5.2 MW 5.2 MW
966431 AG1-512 C Adder 1.59 MW 1.35 MW
966432 AG1-512 E Adder 2.39 MW 2.03 MW
247900 05FR-11G E 50/50 11.04 MW 11.04 MW
247901 05FR-12G E 50/50 10.88 MW 10.88 MW
247902 05FR-21G E 50/50 11.56 MW 11.56 MW
247903 05FR-22G E 50/50 11.11 MW 11.11 MW
247904 05FR-3G E 50/50 21.54 MW 21.54 MW
247905 05FR-4G E 50/50 17.07 MW 17.07 MW
247906 05MDL-1G E 50/50 23.24 MW 23.24 MW
247907 05MDL-2G E 50/50 11.19 MW 11.19 MW
247912 05MDL-3G E 50/50 11.18 MW 11.18 MW
247913 05MDL-4G E 50/50 11.64 MW 11.64 MW
247967 05OLIV SLR E Adder 0.25 MW 0.21 MW
910542 X3-005 E Adder 0.56 MW 0.47 MW
934722 AD1-100 E Adder 64.94 MW 55.2 MW
960681 AF2-359 C 50/50 7.8 MW 7.8 MW
960682 AF2-359 E 50/50 5.2 MW 5.2 MW
243441 05CKG2 50/50 20.62 MW 20.62 MW
243442 05RKG1 50/50 66.97 MW 66.97 MW
243443 05RKG2 50/50 66.07 MW 66.07 MW
243859 05FR-11G C 50/50 0.54 MW 0.54 MW
243862 05FR-12G C 50/50 0.26 MW 0.26 MW
243864 05FR-21G C 50/50 0.27 MW 0.27 MW
243866 05FR-22G C 50/50 0.27 MW 0.27 MW
243870 05FR-3G C 50/50 0.26 MW 0.26 MW
243873 05FR-4G C 50/50 0.61 MW 0.61 MW
274753 CRETE EC ;3U 50/50 1.23 MW 1.23 MW
274754 CRETE EC ;4U 50/50 1.23 MW 1.23 MW
274788 SE CHICAG;5U Adder 3.7 MW 3.14 MW
274789 SE CHICAG;6U Adder 3.7 MW 3.14 MW
274790 SE CHICAG;7U Adder 3.7 MW 3.14 MW
274791 SE CHICAG;8U Adder 3.7 MW 3.14 MW
274792 SE CHICAG;9U Adder 3.7 MW 3.15 MW
274793 SE CHICAG;0U Adder 3.7 MW 3.15 MW
274794 SE CHICAG;1U Adder 3.7 MW 3.15 MW
274795 SE CHICAG;2U Adder 3.7 MW 3.15 MW
946581 AF1-322 C 50/50 11.09 MW 11.09 MW
946582 AF1-322 E 50/50 15.31 MW 15.31 MW
246909 05MDL-1G C 50/50 0.56 MW 0.56 MW
246910 05MDL-2G C 50/50 0.33 MW 0.33 MW
246976 05MDL-3G C 50/50 0.33 MW 0.33 MW
246979 05MDL-4G C 50/50 0.25 MW 0.25 MW
933441 AC2-157 C 50/50 12.8 MW 12.8 MW
933442 AC2-157 E 50/50 20.88 MW 20.88 MW
270100 AB1-080 CT1 50/50 3.94 MW 3.94 MW
270101 AB1-080 CT2 50/50 3.94 MW 3.94 MW
270102 AB1-080 ST 50/50 4.27 MW 4.27 MW
247556 05MDL-5G 50/50 0.43 MW 0.43 MW
247943 T-127 E 50/50 10.53 MW 10.53 MW
930041 AB1-006 E1 50/50 20.09 MW 20.09 MW
930042 AB1-006 E2 50/50 2.87 MW 2.87 MW
252511 Y1-054 E Adder -2.36 MW -2.0 MW
270180 AB1-006 W1 50/50 0.49 MW 0.49 MW
270181 AB1-006 W2 50/50 0.07 MW 0.07 MW
942521 AE2-267 C Adder -3.01 MW -2.56 MW
942601 AE2-276 C 50/50 8.42 MW 8.42 MW
944932 AF1-158 E Adder 5.95 MW 5.06 MW
945391 AF1-204 C 50/50 6.54 MW 6.54 MW
945392 AF1-204 E 50/50 19.62 MW 19.62 MW
945421 AF1-207 C 50/50 4.52 MW 4.52 MW
945422 AF1-207 E 50/50 19.42 MW 19.42 MW
945501 AF1-215 C 50/50 3.31 MW 3.31 MW
945502 AF1-215 E 50/50 14.32 MW 14.32 MW
959141 AF2-205 C 50/50 15.17 MW 15.17 MW
959142 AF2-205 E 50/50 10.11 MW 10.11 MW
961501 AF2-441 C Adder 7.97 MW 6.78 MW
961502 AF2-441 E Adder 11.96 MW 10.16 MW
930461 AB1-087 C 50/50 14.67 MW 14.67 MW
930462 AB1-087 E 50/50 4.21 MW 4.21 MW
930471 AB1-088 C 50/50 14.44 MW 14.44 MW
930472 AB1-088 E 50/50 4.21 MW 4.21 MW
940581 AE2-045 C 50/50 10.79 MW 10.79 MW
940582 AE2-045 E 50/50 14.82 MW 14.82 MW
963741 AG1-226 C 50/50 16.93 MW 16.93 MW
963742 AG1-226 E 50/50 36.71 MW 36.71 MW
963841 AG1-237 C 50/50 3.22 MW 3.22 MW
963842 AG1-237 E 50/50 21.56 MW 21.56 MW
964401 AG1-302 C 50/50 22.13 MW 22.13 MW
964402 AG1-302 E 50/50 14.75 MW 14.75 MW
957371 AF2-031 C Adder 0.8 MW 0.68 MW
957372 AF2-031 E Adder 1.2 MW 1.02 MW
957841 AF2-078 C 50/50 15.96 MW 15.96 MW
957842 AF2-078 E 50/50 10.64 MW 10.64 MW
958381 AF2-132 C 50/50 22.13 MW 22.13 MW
958382 AF2-132 E 50/50 14.75 MW 14.75 MW
958391 AF2-133 C 50/50 22.54 MW 22.54 MW
958392 AF2-133 E 50/50 15.02 MW 15.02 MW
958401 AF2-134 C 50/50 1.1 MW 1.1 MW
958402 AF2-134 E 50/50 4.77 MW 4.77 MW
964861 AG1-349 C 50/50 19.29 MW 19.29 MW
964862 AG1-349 E 50/50 12.86 MW 12.86 MW
965791 AG1-447 C 50/50 5.72 MW 5.72 MW
274751 CRETE EC ;1U 50/50 1.23 MW 1.23 MW
957141 AF2-008 FTIR 50/50 84.21 MW 84.21 MW
944201 AF1-088 FTIR 50/50 168.41 MW 168.41 MW
957142 AF2-008 NFTI 50/50 84.21 MW 84.21 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 113.88 MW 113.88 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 18.07 MW 18.07 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.08 MW 2.08 MW
NY PJM->LTFIMP_NY CLTF 1.05 MW 1.05 MW
WEC LTFEXP_WEC->PJM CLTF 3.01 MW 3.01 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 1.31 MW 1.31 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.8 MW 0.8 MW
TRIMBLE PJM->LTFIMP_TRIMBLE CLTF 10.3 MW 10.3 MW
MEC LTFEXP_MEC->PJM CLTF 11.4 MW 11.4 MW
BlueGrass PJM->LTFIMP_BlueG CLTF 29.51 MW 29.51 MW
LAGN LTFEXP_LAGN->PJM CLTF 1.69 MW 1.69 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 13.3 MW 13.3 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.73 MW 1.73 MW

Details for 05OLIVE-05NEW CARLI1 138.0 kV Ckt 1 line l/o AEP_P4_#9247_05OLIVE 138_R1_SRT-SL


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP
Facility Description:
05OLIVE-05NEW CARLI1 138.0 kV Ckt 1 line
243353 to 244930 ckt 1
Contingency Name:
AEP_P4_#9247_05OLIVE 138_R1_SRT-SL
CONTINGENCY 'AEP_P4_#9247_05OLIVE 138_R1_SRT-SL'
 OPEN BRANCH FROM BUS 243297 TO BUS 243352 CKT 1                /*05GERMAN     138.0 - 05NTRDAM     138.0
 OPEN BRANCH FROM BUS 243297 TO BUS 243353 CKT 1                /*05GERMAN     138.0 - 05OLIVE      138.0
 OPEN BRANCH FROM BUS 243353 TO BUS 244173 CKT 1                /*05OLIVE      138.0 - 05SILVER LAK 138.0
 REMOVE LOAD D5 FROM BUS 243353                                 /*05OLIVE      138.0
 SET POSTCONTRATING 337 BRANCH FROM BUS 243353 TO BUS 244930 CKT 1 /*05OLIVE      138.0 - 05NEW CARLI1 138.0
 SET PRECONTRATING 287 BRANCH FROM BUS 243353 TO BUS 244930 CKT 1 /*05OLIVE      138.0 - 05NEW CARLI1 138.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 113.25 %
Rating: 337.0 MVA
Rating Type: B
MVA to Mitigate: 381.65 MVA
MW Contribution: 2.83 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
243353 05OLIVE 50/50 0.26 MW 0.26 MW
965681 AG1-436 C Adder 3.86 MW 3.28 MW
965682 AG1-436 E Adder 2.57 MW 2.19 MW
247967 05OLIV SLR E 50/50 0.8 MW 0.8 MW
960681 AF2-359 C Adder 3.86 MW 3.28 MW
960682 AF2-359 E Adder 2.57 MW 2.19 MW
244415 05OLIV SLR C 50/50 0.13 MW 0.13 MW
944931 AF1-158 C 50/50 3.56 MW 3.56 MW
944932 AF1-158 E 50/50 14.96 MW 14.96 MW
965791 AG1-447 C Adder 2.83 MW 2.4 MW
990647 J1355 External Queue -11.76 MW -11.76 MW
990662 J1358 External Queue -25.99 MW -25.99 MW
CBM North LTFEXP_CBM-N->PJM CBM 0.18 MW 0.18 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 0.67 MW 0.67 MW
G-007A LTFEXP_G-007A->PJM CMTX 0.34 MW 0.34 MW
VTF LTFEXP_VFT->PJM CMTX 0.91 MW 0.91 MW
LGEE LTFEXP_LGEE->PJM CLTF 0.08 MW 0.08 MW
COTTONWOOD PJM->LTFIMP_COTTONWOOD CLTF 0.38 MW 0.38 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.08 MW 0.08 MW
PRAIRIE PJM->LTFIMP_PRAIRIE CLTF 0.7 MW 0.7 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.01 MW 0.01 MW
MDU PJM->LTFIMP_MDU CLTF 0.08 MW 0.08 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.04 MW 0.04 MW
LTFEXP_AC1-056 LTFEXP_AC1-056->LTFIMP_AC1-056 CLTF 0.36 MW 0.36 MW

Details for 05DUMONT-05SORENS 765.0 kV Ckt 1 line l/o AEP_P4_#7334_05JEFRSO 765_A2_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP
Facility Description:
05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
Contingency Name:
AEP_P4_#7334_05JEFRSO 765_A2_SRT-A
CONTINGENCY 'AEP_P4_#7334_05JEFRSO 765_A2_SRT-A'
 OPEN BRANCH FROM BUS 242865 TO BUS 243208 CKT 2    /*05JEFRSO     345.0 - 05JEFRSO     765.0
 OPEN BRANCH FROM BUS 242865 TO BUS 248000 CKT Z1   /*05JEFRSO     345.0 - 06CLIFTY     345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1    /*05HANG R     765.0 - 05JEFRSO     765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 112.18 %
Rating: 4142.0 MVA
Rating Type: B
MVA to Mitigate: 4646.47 MVA
MW Contribution: 13.1 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 4.94 MW 4.2 MW
962781 AG1-127 C Adder 13.04 MW 11.08 MW
962782 AG1-127 E Adder 8.68 MW 7.38 MW
965681 AG1-436 C Adder 17.86 MW 15.18 MW
965682 AG1-436 E Adder 11.9 MW 10.12 MW
966091 AG1-478 C Adder 3.73 MW 3.17 MW
966092 AG1-478 E Adder 0.94 MW 0.8 MW
966431 AG1-512 C Adder 3.79 MW 3.22 MW
966432 AG1-512 E Adder 5.69 MW 4.83 MW
966441 AG1-513 C Adder 0.94 MW 0.8 MW
966442 AG1-513 E Adder 1.41 MW 1.2 MW
247967 05OLIV SLR E Adder 0.56 MW 0.48 MW
290021 O50 E Adder 35.86 MW 30.48 MW
290051 GSG-6; E Adder 19.65 MW 16.7 MW
295109 WESTBROOK E Adder 10.52 MW 8.94 MW
295111 SUBLETTE E Adder 5.11 MW 4.35 MW
910542 X3-005 E Adder 1.33 MW 1.13 MW
918052 AA1-018 E OP Adder 29.73 MW 25.27 MW
933911 AD1-013 C Adder 3.46 MW 2.94 MW
933912 AD1-013 E Adder 5.52 MW 4.69 MW
934722 AD1-100 E Adder 166.41 MW 141.45 MW
937002 AD2-134 E Adder 19.0 MW 16.15 MW
942991 AE2-321 C Adder 15.15 MW 12.88 MW
942992 AE2-321 E Adder 7.46 MW 6.34 MW
958481 AF2-142 C Adder 20.5 MW 17.43 MW
958482 AF2-142 E Adder 13.67 MW 11.62 MW
958491 AF2-143 C Adder 20.22 MW 17.18 MW
958492 AF2-143 E Adder 13.48 MW 11.46 MW
959351 AF2-226 C Adder 4.56 MW 3.87 MW
959352 AF2-226 E Adder 6.84 MW 5.81 MW
960281 AF2-319 C Adder 4.56 MW 3.87 MW
960282 AF2-319 E Adder 6.84 MW 5.81 MW
960582 AF2-349 E Adder 67.42 MW 57.31 MW
960681 AF2-359 C Adder 17.86 MW 15.18 MW
960682 AF2-359 E Adder 11.9 MW 10.12 MW
960751 AF2-366 C Adder 13.0 MW 11.05 MW
960752 AF2-366 E Adder 8.67 MW 7.37 MW
243441 05CKG2 50/50 60.08 MW 60.08 MW
274660 LASCO STA;1U 50/50 44.09 MW 44.09 MW
274661 LASCO STA;2U 50/50 44.23 MW 44.23 MW
274675 JOLIET 29;7U Adder 129.55 MW 110.12 MW
274676 JOLIET 29;8U Adder 129.55 MW 110.12 MW
274682 WAUKEGAN ;7U Adder 75.48 MW 64.16 MW
274683 WAUKEGAN ;8U Adder 81.44 MW 69.22 MW
274687 WILL CNTY;4U Adder 120.06 MW 102.05 MW
274771 LINCOLN ;2U 50/50 3.15 MW 3.15 MW
274772 LINCOLN ;3U 50/50 3.15 MW 3.15 MW
274773 LINCOLN ;4U 50/50 3.15 MW 3.15 MW
274774 LINCOLN ;5U 50/50 3.15 MW 3.15 MW
274775 LINCOLN ;6U 50/50 3.15 MW 3.15 MW
274776 LINCOLN ;7U 50/50 3.15 MW 3.15 MW
274777 LINCOLN ;8U 50/50 3.15 MW 3.15 MW
274788 SE CHICAG;5U Adder 8.75 MW 7.43 MW
274789 SE CHICAG;6U Adder 8.75 MW 7.43 MW
274790 SE CHICAG;7U Adder 8.75 MW 7.43 MW
274791 SE CHICAG;8U Adder 8.75 MW 7.43 MW
274792 SE CHICAG;9U Adder 8.74 MW 7.43 MW
274793 SE CHICAG;0U Adder 8.74 MW 7.43 MW
274794 SE CHICAG;1U Adder 8.74 MW 7.43 MW
274795 SE CHICAG;2U Adder 8.74 MW 7.43 MW
276591 L-013 2 Adder 6.75 MW 5.74 MW
293061 N-015 E Adder 28.27 MW 24.03 MW
293644 O22 E1 Adder 26.18 MW 22.26 MW
293645 O22 E2 Adder 29.99 MW 25.49 MW
294392 P-010 E Adder 35.91 MW 30.52 MW
933411 AC2-154 C Adder 4.5 MW 3.83 MW
933412 AC2-154 E Adder 7.34 MW 6.24 MW
957331 AF2-027 C Adder 4.58 MW 3.89 MW
957332 AF2-027 E Adder 6.86 MW 5.83 MW
274674 JOLIET 9 ;6U Adder 66.1 MW 56.18 MW
274890 CAYUG;1U E Adder 26.79 MW 22.77 MW
274891 CAYUG;2U E Adder 26.79 MW 22.77 MW
938851 AE1-113 C Adder 14.79 MW 12.57 MW
938852 AE1-113 E Adder 52.45 MW 44.58 MW
934101 AD2-000 1 Adder 10.81 MW 9.19 MW
934111 AD2-000 2 Adder 10.84 MW 9.21 MW
270100 AB1-080 CT1 50/50 9.03 MW 9.03 MW
270101 AB1-080 CT2 50/50 9.03 MW 9.03 MW
270102 AB1-080 ST 50/50 9.77 MW 9.77 MW
274708 KENDALL ;3C 50/50 7.18 MW 7.18 MW
274709 KENDALL ;3S 50/50 4.75 MW 4.75 MW
274710 KENDALL ;4C 50/50 7.1 MW 7.1 MW
274711 KENDALL ;4S 50/50 4.75 MW 4.75 MW
275149 KELLYCK ;1E Adder 33.17 MW 28.2 MW
293519 PILOT HIL;1E Adder 33.17 MW 28.2 MW
290108 LEEDK;1U E Adder 44.84 MW 38.11 MW
916221 Z1-073 E Adder 13.84 MW 11.77 MW
936292 AD2-038 E Adder 27.76 MW 23.6 MW
936371 AD2-047 C Adder 8.06 MW 6.85 MW
936372 AD2-047 E Adder 39.33 MW 33.43 MW
936461 AD2-060 C Adder 4.74 MW 4.03 MW
936511 AD2-066 C Adder 15.69 MW 13.34 MW
936512 AD2-066 E Adder 10.46 MW 8.89 MW
942421 AE2-255 C Adder 5.6 MW 4.76 MW
942422 AE2-255 E Adder 16.81 MW 14.29 MW
942651 AE2-281 C Adder 1.57 MW 1.34 MW
942652 AE2-281 E Adder 9.66 MW 8.21 MW
943121 AE2-341 C Adder 23.66 MW 20.11 MW
943122 AE2-341 E Adder 11.62 MW 9.88 MW
943591 AF1-030 C Adder 15.74 MW 13.38 MW
943592 AF1-030 E Adder 7.79 MW 6.62 MW
960591 AF2-350 C Adder 14.22 MW 12.08 MW
960592 AF2-350 E Adder 9.48 MW 8.06 MW
961501 AF2-441 C Adder 18.96 MW 16.11 MW
961502 AF2-441 E Adder 28.44 MW 24.17 MW
930481 AB1-089 C Adder 48.87 MW 41.54 MW
939321 AE1-163 C Adder 11.01 MW 9.36 MW
939322 AE1-163 E Adder 67.61 MW 57.47 MW
939351 AE1-166 C Adder 18.54 MW 15.76 MW
939352 AE1-166 E Adder 17.12 MW 14.55 MW
939401 AE1-172 C Adder 10.22 MW 8.69 MW
939402 AE1-172 E Adder 47.84 MW 40.66 MW
946671 AF1-331 C Adder 4.49 MW 3.82 MW
962691 AG1-118 C Adder 41.23 MW 35.05 MW
962692 AG1-118 E Adder 27.49 MW 23.36 MW
941551 AE2-152 C Adder 21.4 MW 18.19 MW
941552 AE2-152 E Adder 14.26 MW 12.12 MW
957371 AF2-031 C Adder 1.89 MW 1.61 MW
957372 AF2-031 E Adder 2.84 MW 2.41 MW
958011 AF2-095 C Adder 20.47 MW 17.4 MW
958012 AF2-095 E Adder 13.65 MW 11.6 MW
965791 AG1-447 C Adder 13.1 MW 11.13 MW
274770 LINCOLN ;1U 50/50 3.15 MW 3.15 MW
276675 AE2-062 E Adder 0.28 MW 0.23 MW
276170 Z1-108 E Adder 5.4 MW 4.59 MW
920272 AA2-123 E Adder 5.33 MW 4.53 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 269.96 MW 269.96 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 58.1 MW 58.1 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.96 MW 5.96 MW
NY PJM->LTFIMP_NY CLTF 3.12 MW 3.12 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.24 MW 1.24 MW
WEC LTFEXP_WEC->PJM CLTF 7.27 MW 7.27 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 1.4 MW 1.4 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.69 MW 0.69 MW
TVA LTFEXP_TVA->PJM CLTF 5.86 MW 5.86 MW
MEC LTFEXP_MEC->PJM CLTF 27.55 MW 27.55 MW
LAGN LTFEXP_LAGN->PJM CLTF 10.93 MW 10.93 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.75 MW 0.75 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 38.2 MW 38.2 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 2.12 MW 2.12 MW

Details for 05SORENS-05MARYSV 765.0 kV Ckt 1 line l/o AEP_P4_#7334_05JEFRSO 765_A2_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP
Facility Description:
05SORENS-05MARYSV 765.0 kV Ckt 1 line
246999 to 242928 ckt 1
Contingency Name:
AEP_P4_#7334_05JEFRSO 765_A2_SRT-A
CONTINGENCY 'AEP_P4_#7334_05JEFRSO 765_A2_SRT-A'
 OPEN BRANCH FROM BUS 242865 TO BUS 243208 CKT 2    /*05JEFRSO     345.0 - 05JEFRSO     765.0
 OPEN BRANCH FROM BUS 242865 TO BUS 248000 CKT Z1   /*05JEFRSO     345.0 - 06CLIFTY     345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1    /*05HANG R     765.0 - 05JEFRSO     765.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 103.54 %
Rating: 4142.0 MVA
Rating Type: B
MVA to Mitigate: 4288.52 MVA
MW Contribution: 14.39 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
243353 05OLIVE 50/50 0.21 MW 0.21 MW
965681 AG1-436 C 50/50 19.62 MW 19.62 MW
965682 AG1-436 E 50/50 13.08 MW 13.08 MW
966091 AG1-478 C Adder 3.89 MW 3.31 MW
966092 AG1-478 E Adder 0.98 MW 0.83 MW
966431 AG1-512 C Adder 3.99 MW 3.39 MW
966432 AG1-512 E Adder 5.98 MW 5.09 MW
966441 AG1-513 C Adder 0.97 MW 0.83 MW
966442 AG1-513 E Adder 1.46 MW 1.24 MW
246422 05MAYFLWER 50/50 0.24 MW 0.24 MW
246431 05BUCHANAN 50/50 0.08 MW 0.08 MW
247643 Z2-116 C 50/50 0.06 MW 0.06 MW
247966 05WTRV SLR E Adder 0.58 MW 0.49 MW
247967 05OLIV SLR E 50/50 0.65 MW 0.65 MW
247969 Z2-116 E 50/50 0.34 MW 0.34 MW
910542 X3-005 E Adder 1.4 MW 1.19 MW
918052 AA1-018 E OP Adder 31.26 MW 26.57 MW
934722 AD1-100 E Adder 172.7 MW 146.79 MW
943001 AE2-323 C Adder 16.55 MW 14.07 MW
943002 AE2-323 E Adder 8.12 MW 6.9 MW
943021 AE2-325 C 50/50 7.96 MW 7.96 MW
943022 AE2-325 E 50/50 5.31 MW 5.31 MW
944161 AF1-084 C Adder 13.7 MW 11.65 MW
944162 AF1-084 E Adder 7.83 MW 6.65 MW
944961 AF1-161 C 50/50 6.36 MW 6.36 MW
958481 AF2-142 C Adder 21.56 MW 18.32 MW
958482 AF2-142 E Adder 14.37 MW 12.22 MW
959351 AF2-226 C Adder 4.8 MW 4.08 MW
959352 AF2-226 E Adder 7.2 MW 6.12 MW
960281 AF2-319 C Adder 4.8 MW 4.08 MW
960282 AF2-319 E Adder 7.2 MW 6.12 MW
960681 AF2-359 C 50/50 19.62 MW 19.62 MW
960682 AF2-359 E 50/50 13.08 MW 13.08 MW
960981 AF2-389 C 50/50 7.68 MW 7.68 MW
960982 AF2-389 E 50/50 5.12 MW 5.12 MW
243071 05BERRINSP G 50/50 0.14 MW 0.14 MW
243440 05CKG1 50/50 43.35 MW 43.35 MW
243441 05CKG2 50/50 55.77 MW 55.77 MW
244415 05OLIV SLR C 50/50 0.1 MW 0.1 MW
270142 AA2-116_CT1 50/50 15.9 MW 15.9 MW
270143 AA2-116_CT2 50/50 15.9 MW 15.9 MW
270144 AA2-116_ST 50/50 14.09 MW 14.09 MW
274675 JOLIET 29;7U Adder 134.93 MW 114.69 MW
274676 JOLIET 29;8U Adder 134.93 MW 114.69 MW
274682 WAUKEGAN ;7U Adder 78.66 MW 66.86 MW
274683 WAUKEGAN ;8U Adder 79.26 MW 67.37 MW
274687 WILL CNTY;4U Adder 125.3 MW 106.51 MW
274771 LINCOLN ;2U 50/50 3.19 MW 3.19 MW
274772 LINCOLN ;3U 50/50 3.19 MW 3.19 MW
274773 LINCOLN ;4U 50/50 3.19 MW 3.19 MW
274775 LINCOLN ;6U 50/50 3.19 MW 3.19 MW
274777 LINCOLN ;8U 50/50 3.19 MW 3.19 MW
274788 SE CHICAG;5U Adder 9.28 MW 7.89 MW
274789 SE CHICAG;6U Adder 9.28 MW 7.89 MW
274790 SE CHICAG;7U Adder 9.28 MW 7.89 MW
274791 SE CHICAG;8U Adder 9.28 MW 7.89 MW
274792 SE CHICAG;9U Adder 9.28 MW 7.89 MW
274793 SE CHICAG;0U Adder 9.28 MW 7.89 MW
274794 SE CHICAG;1U Adder 9.28 MW 7.89 MW
274795 SE CHICAG;2U Adder 9.28 MW 7.89 MW
276591 L-013 2 Adder 7.01 MW 5.96 MW
293061 N-015 E Adder 29.32 MW 24.93 MW
293644 O22 E1 Adder 27.56 MW 23.43 MW
293645 O22 E2 Adder 31.56 MW 26.83 MW
294392 P-010 E Adder 37.24 MW 31.66 MW
933411 AC2-154 C Adder 4.7 MW 4.0 MW
933412 AC2-154 E Adder 7.67 MW 6.52 MW
274674 JOLIET 9 ;6U Adder 68.86 MW 58.53 MW
934101 AD2-000 1 Adder 11.24 MW 9.56 MW
934111 AD2-000 2 Adder 11.3 MW 9.61 MW
243352 05NTRDAM 50/50 2.43 MW 2.43 MW
246416 05TWIN BRNCH 50/50 0.07 MW 0.07 MW
246476 05NILES 50/50 0.06 MW 0.06 MW
246477 05NILES 50/50 0.06 MW 0.06 MW
270100 AB1-080 CT1 50/50 9.96 MW 9.96 MW
270101 AB1-080 CT2 50/50 9.96 MW 9.96 MW
270102 AB1-080 ST 50/50 10.77 MW 10.77 MW
270216 AD2-079_C O1 50/50 0.5 MW 0.5 MW
275149 KELLYCK ;1E Adder 34.63 MW 29.44 MW
293519 PILOT HIL;1E Adder 34.63 MW 29.44 MW
936632 AD2-079 E O1 50/50 2.05 MW 2.05 MW
936141 AD2-020 C 50/50 15.74 MW 15.74 MW
936371 AD2-047 C Adder 8.41 MW 7.15 MW
936372 AD2-047 E Adder 41.06 MW 34.91 MW
936461 AD2-060 C Adder 4.95 MW 4.21 MW
942241 AE2-236 C Adder 9.78 MW 8.31 MW
942242 AE2-236 E Adder 4.19 MW 3.56 MW
943121 AE2-341 C Adder 24.45 MW 20.79 MW
943122 AE2-341 E Adder 12.01 MW 10.21 MW
943591 AF1-030 C Adder 16.26 MW 13.82 MW
943592 AF1-030 E Adder 8.05 MW 6.84 MW
944241 AF1-092 C Adder 29.05 MW 24.69 MW
944242 AF1-092 E Adder 8.84 MW 7.52 MW
944931 AF1-158 C 50/50 3.71 MW 3.71 MW
944932 AF1-158 E 50/50 15.58 MW 15.58 MW
945111 AF1-176 C 50/50 39.6 MW 39.6 MW
945112 AF1-176 E 50/50 36.71 MW 36.71 MW
945421 AF1-207 C Adder 8.2 MW 6.97 MW
945422 AF1-207 E Adder 35.22 MW 29.94 MW
945502 AF1-215 E Adder 30.2 MW 25.67 MW
959141 AF2-205 C Adder 29.56 MW 25.12 MW
959142 AF2-205 E Adder 19.7 MW 16.75 MW
960591 AF2-350 C Adder 14.84 MW 12.62 MW
960592 AF2-350 E Adder 9.9 MW 8.41 MW
961051 AF2-396 C 50/50 50.86 MW 50.86 MW
961501 AF2-441 C Adder 20.01 MW 17.0 MW
961502 AF2-441 E Adder 30.01 MW 25.51 MW
939351 AE1-166 C Adder 19.24 MW 16.36 MW
939352 AE1-166 E Adder 17.76 MW 15.1 MW
939391 AE1-170 C 50/50 16.18 MW 16.18 MW
939392 AE1-170 E 50/50 22.34 MW 22.34 MW
940581 AE2-045 C Adder 20.65 MW 17.55 MW
940582 AE2-045 E Adder 28.35 MW 24.1 MW
962601 AG1-109 C 50/50 6.36 MW 6.36 MW
964401 AG1-302 C Adder 44.81 MW 38.09 MW
964402 AG1-302 E Adder 29.87 MW 25.39 MW
936142 AD2-020 E 50/50 9.69 MW 9.69 MW
941551 AE2-152 C Adder 22.2 MW 18.87 MW
941552 AE2-152 E Adder 14.8 MW 12.58 MW
957371 AF2-031 C Adder 2.01 MW 1.71 MW
957372 AF2-031 E Adder 3.01 MW 2.56 MW
957841 AF2-078 C Adder 28.95 MW 24.61 MW
957842 AF2-078 E Adder 19.3 MW 16.41 MW
957891 AF2-083 C 50/50 25.62 MW 25.62 MW
957892 AF2-083 E 50/50 12.81 MW 12.81 MW
958011 AF2-095 C Adder 21.37 MW 18.17 MW
958012 AF2-095 E Adder 14.25 MW 12.11 MW
958381 AF2-132 C Adder 44.81 MW 38.09 MW
958382 AF2-132 E Adder 29.87 MW 25.39 MW
958391 AF2-133 C Adder 44.5 MW 37.82 MW
958392 AF2-133 E Adder 29.67 MW 25.22 MW
958402 AF2-134 E Adder 10.07 MW 8.56 MW
964861 AG1-349 C Adder 38.75 MW 32.94 MW
964862 AG1-349 E Adder 25.83 MW 21.96 MW
965791 AG1-447 C 50/50 14.39 MW 14.39 MW
276675 AE2-062 E Adder 0.29 MW 0.24 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 321.03 MW 321.03 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 75.8 MW 75.8 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 7.05 MW 7.05 MW
NY PJM->LTFIMP_NY CLTF 3.66 MW 3.66 MW
LGEE LTFEXP_LGEE->PJM CLTF 3.88 MW 3.88 MW
WEC LTFEXP_WEC->PJM CLTF 7.63 MW 7.63 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 1.49 MW 1.49 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.7 MW 0.7 MW
TVA LTFEXP_TVA->PJM CLTF 8.29 MW 8.29 MW
MEC LTFEXP_MEC->PJM CLTF 30.19 MW 30.19 MW
LAGN LTFEXP_LAGN->PJM CLTF 13.89 MW 13.89 MW
SIGE LTFEXP_SIGE->PJM CLTF 1.24 MW 1.24 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 45.17 MW 45.17 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 2.34 MW 2.34 MW

Details for 05DUMONT-05SORENS 765.0 kV Ckt 1 line l/o AEP_P4_#6189_05HANG R 765_D1_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP
Facility Description:
05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
Contingency Name:
AEP_P4_#6189_05HANG R 765_D1_SRT-A
CONTINGENCY 'AEP_P4_#6189_05HANG R 765_D1_SRT-A'
 OPEN BRANCH FROM BUS 242921 TO BUS 242924 CKT 1   /*05CORNU      765.0 - 05HANG R     765.0
 OPEN BRANCH FROM BUS 242921 TO BUS 242934 CKT 1   /*05CORNU      765.0 - 05CORNU      345.0
 OPEN BRANCH FROM BUS 242924 TO BUS 243208 CKT 1   /*05HANG R     765.0 - 05JEFRSO     765.0
 REMOVE UNIT 1A FROM BUS 247245                    /*05HRKG1A      18.0
 REMOVE UNIT 1B FROM BUS 247246                    /*05HRKG1B      18.0
 REMOVE UNIT 1S FROM BUS 247247                    /*05HRKG1S      18.0
 REMOVE UNIT 2 FROM BUS 247249                     /*05HRKG2B      18.0
 REMOVE UNIT 2A FROM BUS 247248                    /*05HRKG2A      18.0
 REMOVE UNIT 2S FROM BUS 247250                    /*05HRKG2S      18.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 101.0 %
Rating: 4142.0 MVA
Rating Type: B
MVA to Mitigate: 4183.58 MVA
MW Contribution: 11.82 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 4.48 MW 3.81 MW
962781 AG1-127 C Adder 11.84 MW 10.06 MW
962782 AG1-127 E Adder 7.88 MW 6.7 MW
965681 AG1-436 C Adder 16.12 MW 13.71 MW
965682 AG1-436 E Adder 10.75 MW 9.14 MW
966091 AG1-478 C Adder 3.38 MW 2.87 MW
966092 AG1-478 E Adder 0.85 MW 0.72 MW
966431 AG1-512 C Adder 3.44 MW 2.92 MW
966432 AG1-512 E Adder 5.16 MW 4.38 MW
966441 AG1-513 C Adder 0.85 MW 0.72 MW
966442 AG1-513 E Adder 1.28 MW 1.08 MW
290021 O50 E Adder 32.48 MW 27.61 MW
290051 GSG-6; E Adder 17.83 MW 15.16 MW
295109 WESTBROOK E Adder 9.55 MW 8.12 MW
295111 SUBLETTE E Adder 4.64 MW 3.94 MW
910542 X3-005 E Adder 1.2 MW 1.02 MW
918052 AA1-018 E OP Adder 26.94 MW 22.9 MW
933911 AD1-013 C Adder 3.14 MW 2.67 MW
933912 AD1-013 E Adder 5.01 MW 4.26 MW
934722 AD1-100 E Adder 151.01 MW 128.36 MW
937002 AD2-134 E Adder 17.24 MW 14.66 MW
942991 AE2-321 C Adder 13.75 MW 11.69 MW
942992 AE2-321 E Adder 6.77 MW 5.76 MW
958481 AF2-142 C Adder 18.58 MW 15.79 MW
958482 AF2-142 E Adder 12.38 MW 10.53 MW
958491 AF2-143 C Adder 18.31 MW 15.56 MW
958492 AF2-143 E Adder 12.2 MW 10.37 MW
959351 AF2-226 C Adder 4.13 MW 3.51 MW
959352 AF2-226 E Adder 6.19 MW 5.26 MW
960281 AF2-319 C Adder 4.13 MW 3.51 MW
960282 AF2-319 E Adder 6.19 MW 5.26 MW
960582 AF2-349 E Adder 61.2 MW 52.02 MW
960681 AF2-359 C Adder 16.12 MW 13.71 MW
960682 AF2-359 E Adder 10.75 MW 9.14 MW
960751 AF2-366 C Adder 11.81 MW 10.04 MW
960752 AF2-366 E Adder 7.87 MW 6.69 MW
243441 05CKG2 50/50 55.5 MW 55.5 MW
274660 LASCO STA;1U 50/50 40.05 MW 40.05 MW
274661 LASCO STA;2U 50/50 40.18 MW 40.18 MW
274675 JOLIET 29;7U Adder 117.59 MW 99.95 MW
274676 JOLIET 29;8U Adder 117.59 MW 99.95 MW
274682 WAUKEGAN ;7U Adder 68.53 MW 58.25 MW
274683 WAUKEGAN ;8U Adder 73.93 MW 62.84 MW
274687 WILL CNTY;4U Adder 108.94 MW 92.6 MW
274771 LINCOLN ;2U 50/50 2.87 MW 2.87 MW
274772 LINCOLN ;3U 50/50 2.87 MW 2.87 MW
274773 LINCOLN ;4U 50/50 2.87 MW 2.87 MW
274774 LINCOLN ;5U 50/50 2.87 MW 2.87 MW
274775 LINCOLN ;6U 50/50 2.87 MW 2.87 MW
274776 LINCOLN ;7U 50/50 2.87 MW 2.87 MW
274777 LINCOLN ;8U 50/50 2.87 MW 2.87 MW
274788 SE CHICAG;5U Adder 7.92 MW 6.74 MW
274789 SE CHICAG;6U Adder 7.92 MW 6.74 MW
274790 SE CHICAG;7U Adder 7.92 MW 6.74 MW
274791 SE CHICAG;8U Adder 7.92 MW 6.74 MW
274792 SE CHICAG;9U Adder 7.91 MW 6.73 MW
274793 SE CHICAG;0U Adder 7.91 MW 6.73 MW
274794 SE CHICAG;1U Adder 7.91 MW 6.73 MW
274795 SE CHICAG;2U Adder 7.91 MW 6.73 MW
276591 L-013 2 Adder 6.13 MW 5.21 MW
293061 N-015 E Adder 25.67 MW 21.82 MW
293644 O22 E1 Adder 23.72 MW 20.17 MW
293645 O22 E2 Adder 27.17 MW 23.1 MW
294392 P-010 E Adder 32.6 MW 27.71 MW
933411 AC2-154 C Adder 4.08 MW 3.47 MW
933412 AC2-154 E Adder 6.66 MW 5.66 MW
957331 AF2-027 C Adder 4.15 MW 3.53 MW
957332 AF2-027 E Adder 6.23 MW 5.3 MW
274674 JOLIET 9 ;6U Adder 59.98 MW 50.99 MW
938851 AE1-113 C Adder 13.4 MW 11.39 MW
938852 AE1-113 E Adder 47.5 MW 40.38 MW
934101 AD2-000 1 Adder 9.8 MW 8.33 MW
934111 AD2-000 2 Adder 9.83 MW 8.36 MW
270100 AB1-080 CT1 50/50 8.15 MW 8.15 MW
270101 AB1-080 CT2 50/50 8.15 MW 8.15 MW
270102 AB1-080 ST 50/50 8.82 MW 8.82 MW
274708 KENDALL ;3C 50/50 6.53 MW 6.53 MW
274709 KENDALL ;3S 50/50 4.32 MW 4.32 MW
274710 KENDALL ;4C 50/50 6.45 MW 6.45 MW
274711 KENDALL ;4S 50/50 4.32 MW 4.32 MW
275149 KELLYCK ;1E Adder 30.09 MW 25.58 MW
293519 PILOT HIL;1E Adder 30.09 MW 25.58 MW
290108 LEEDK;1U E Adder 40.71 MW 34.6 MW
916221 Z1-073 E Adder 12.57 MW 10.68 MW
936292 AD2-038 E Adder 25.14 MW 21.37 MW
936371 AD2-047 C Adder 7.31 MW 6.21 MW
936372 AD2-047 E Adder 35.68 MW 30.33 MW
936461 AD2-060 C Adder 4.3 MW 3.65 MW
936511 AD2-066 C Adder 14.21 MW 12.08 MW
936512 AD2-066 E Adder 9.47 MW 8.05 MW
942421 AE2-255 C Adder 5.08 MW 4.31 MW
942422 AE2-255 E Adder 15.23 MW 12.94 MW
942651 AE2-281 C Adder 1.42 MW 1.21 MW
942652 AE2-281 E Adder 8.75 MW 7.43 MW
943121 AE2-341 C Adder 21.5 MW 18.28 MW
943122 AE2-341 E Adder 10.56 MW 8.97 MW
943591 AF1-030 C Adder 14.3 MW 12.15 MW
943592 AF1-030 E Adder 7.08 MW 6.01 MW
960591 AF2-350 C Adder 12.9 MW 10.96 MW
960592 AF2-350 E Adder 8.6 MW 7.31 MW
961501 AF2-441 C Adder 17.19 MW 14.61 MW
961502 AF2-441 E Adder 25.78 MW 21.91 MW
930481 AB1-089 C Adder 77.11 MW 65.54 MW
939321 AE1-163 C Adder 9.97 MW 8.47 MW
939322 AE1-163 E Adder 61.23 MW 52.04 MW
939351 AE1-166 C Adder 16.83 MW 14.3 MW
939352 AE1-166 E Adder 15.53 MW 13.2 MW
939401 AE1-172 C Adder 9.24 MW 7.86 MW
939402 AE1-172 E Adder 43.26 MW 36.77 MW
946671 AF1-331 C Adder 4.08 MW 3.46 MW
962691 AG1-118 C Adder 37.44 MW 31.82 MW
962692 AG1-118 E Adder 24.96 MW 21.21 MW
941551 AE2-152 C Adder 19.42 MW 16.5 MW
941552 AE2-152 E Adder 12.94 MW 11.0 MW
957371 AF2-031 C Adder 1.71 MW 1.46 MW
957372 AF2-031 E Adder 2.57 MW 2.19 MW
958011 AF2-095 C Adder 18.57 MW 15.79 MW
958012 AF2-095 E Adder 12.38 MW 10.52 MW
965791 AG1-447 C Adder 11.82 MW 10.05 MW
274770 LINCOLN ;1U 50/50 2.87 MW 2.87 MW
276675 AE2-062 E Adder 0.25 MW 0.21 MW
276170 Z1-108 E Adder 4.9 MW 4.17 MW
920272 AA2-123 E Adder 4.84 MW 4.11 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 244.38 MW 244.38 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 53.86 MW 53.86 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.55 MW 5.55 MW
NY PJM->LTFIMP_NY CLTF 2.92 MW 2.92 MW
LGEE LTFEXP_LGEE->PJM CLTF 3.06 MW 3.06 MW
WEC LTFEXP_WEC->PJM CLTF 6.6 MW 6.6 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 1.14 MW 1.14 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.54 MW 0.54 MW
TVA LTFEXP_TVA->PJM CLTF 5.99 MW 5.99 MW
MEC LTFEXP_MEC->PJM CLTF 25.0 MW 25.0 MW
LAGN LTFEXP_LAGN->PJM CLTF 10.48 MW 10.48 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.78 MW 0.78 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 35.62 MW 35.62 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.78 MW 1.78 MW

Details for 19MON12-02LALLENDORF 345.0 kV Ckt 1 line l/o ATSI_P7-1_TE-345-025T_SRT-A-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: ATSI/ITCT
Facility Description:
19MON12-02LALLENDORF 345.0 kV Ckt 1 line
264612 to 241901 ckt 1
Contingency Name:
ATSI_P7-1_TE-345-025T_SRT-A-1
CONTINGENCY 'ATSI_P7-1_TE-345-025T_SRT-A-1'
 DISCONNECT BRANCH FROM BUS 238889 TO BUS 955780 CKT 1   /*02LEMOYN     345.0 - J1062 POI    345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 256583 CKT 1   /*19LULU       345.0 - 18MOROCCO    345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264613 CKT 1   /*19LULU       345.0 - 19MON34      345.0
 DISCONNECT BRANCH FROM BUS 264594 TO BUS 264839 CKT 1   /*19LULU       345.0 - 19MILAN      345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 114.87 %
Rating: 1660.0 MVA
Rating Type: B
MVA to Mitigate: 1906.81 MVA
MW Contribution: 4.5 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
965681 AG1-436 C Adder 6.13 MW 5.21 MW
965682 AG1-436 E Adder 4.09 MW 3.48 MW
966091 AG1-478 C Adder 1.1 MW 0.94 MW
966092 AG1-478 E Adder 0.28 MW 0.24 MW
966431 AG1-512 C Adder 1.15 MW 0.98 MW
966432 AG1-512 E Adder 1.73 MW 1.47 MW
247528 05COVRT1 50/50 4.67 MW 4.67 MW
247529 05COVRT2 50/50 4.67 MW 4.67 MW
247530 05COVRT3 50/50 4.67 MW 4.67 MW
247531 05COVRT4 50/50 2.81 MW 2.81 MW
247532 05COVRT5 50/50 2.79 MW 2.79 MW
247533 05COVRT6 50/50 2.28 MW 2.28 MW
247906 05MDL-1G E Adder 12.22 MW 10.38 MW
247907 05MDL-2G E Adder 5.88 MW 5.0 MW
247912 05MDL-3G E Adder 5.88 MW 4.99 MW
247913 05MDL-4G E Adder 6.12 MW 5.2 MW
247966 05WTRV SLR E 50/50 0.25 MW 0.25 MW
247967 05OLIV SLR E Adder 0.22 MW 0.18 MW
247969 Z2-116 E Adder 0.12 MW 0.1 MW
910542 X3-005 E Adder 0.4 MW 0.34 MW
934722 AD1-100 E Adder 48.52 MW 41.24 MW
943001 AE2-323 C Adder 5.18 MW 4.41 MW
943002 AE2-323 E Adder 2.54 MW 2.16 MW
943021 AE2-325 C 50/50 3.19 MW 3.19 MW
943022 AE2-325 E 50/50 2.12 MW 2.12 MW
944161 AF1-084 C 50/50 5.61 MW 5.61 MW
944162 AF1-084 E 50/50 3.21 MW 3.21 MW
944961 AF1-161 C 50/50 2.54 MW 2.54 MW
945641 AF1-229 C Adder -7.21 MW -6.13 MW
960681 AF2-359 C Adder 6.13 MW 5.21 MW
960682 AF2-359 E Adder 4.09 MW 3.48 MW
960841 AF2-375 C Adder -7.2 MW -6.12 MW
960981 AF2-389 C Adder 2.93 MW 2.49 MW
960982 AF2-389 E Adder 1.95 MW 1.66 MW
243071 05BERRINSP G 50/50 0.05 MW 0.05 MW
244412 05WTRV SLR C 50/50 0.04 MW 0.04 MW
274675 JOLIET 29;7U Adder 38.19 MW 32.46 MW
274676 JOLIET 29;8U Adder 38.19 MW 32.46 MW
274687 WILL CNTY;4U Adder 35.55 MW 30.22 MW
274788 SE CHICAG;5U Adder 2.69 MW 2.29 MW
274789 SE CHICAG;6U Adder 2.69 MW 2.29 MW
274790 SE CHICAG;7U Adder 2.69 MW 2.29 MW
274791 SE CHICAG;8U Adder 2.69 MW 2.29 MW
274792 SE CHICAG;9U Adder 2.7 MW 2.29 MW
274793 SE CHICAG;0U Adder 2.7 MW 2.29 MW
274794 SE CHICAG;1U Adder 2.7 MW 2.29 MW
274795 SE CHICAG;2U Adder 2.7 MW 2.29 MW
933411 AC2-154 C Adder 1.33 MW 1.13 MW
933412 AC2-154 E Adder 2.18 MW 1.85 MW
941781 AE2-181 C Adder -2.69 MW -2.29 MW
946581 AF1-322 C Adder 5.83 MW 4.95 MW
946582 AF1-322 E Adder 8.05 MW 6.84 MW
274674 JOLIET 9 ;6U Adder 19.47 MW 16.55 MW
247604 X1-042 50/50 0.07 MW 0.07 MW
275149 KELLYCK ;1E Adder 9.82 MW 8.35 MW
293519 PILOT HIL;1E Adder 9.82 MW 8.35 MW
936632 AD2-079 E O1 Adder 0.73 MW 0.62 MW
247943 T-127 E Adder 5.54 MW 4.71 MW
930041 AB1-006 E1 Adder 10.56 MW 8.98 MW
930042 AB1-006 E2 Adder 1.51 MW 1.28 MW
936141 AD2-020 C 50/50 6.29 MW 6.29 MW
936371 AD2-047 C Adder 2.39 MW 2.03 MW
936372 AD2-047 E Adder 11.65 MW 9.9 MW
936461 AD2-060 C Adder 1.4 MW 1.19 MW
944932 AF1-158 E Adder 5.26 MW 4.47 MW
945111 AF1-176 C Adder 15.37 MW 13.06 MW
945112 AF1-176 E Adder 14.25 MW 12.11 MW
945421 AF1-207 C Adder 2.41 MW 2.05 MW
945422 AF1-207 E Adder 10.34 MW 8.79 MW
945502 AF1-215 E Adder 9.19 MW 7.82 MW
959141 AF2-205 C Adder 8.84 MW 7.51 MW
959142 AF2-205 E Adder 5.89 MW 5.01 MW
960591 AF2-350 C Adder 4.21 MW 3.58 MW
960592 AF2-350 E Adder 2.81 MW 2.39 MW
961051 AF2-396 C 50/50 20.12 MW 20.12 MW
961501 AF2-441 C Adder 5.76 MW 4.9 MW
961502 AF2-441 E Adder 8.64 MW 7.35 MW
939351 AE1-166 C Adder 5.41 MW 4.6 MW
939352 AE1-166 E Adder 4.99 MW 4.24 MW
939391 AE1-170 C Adder 6.18 MW 5.25 MW
939392 AE1-170 E Adder 8.53 MW 7.25 MW
940581 AE2-045 C Adder 6.15 MW 5.22 MW
940582 AE2-045 E Adder 8.44 MW 7.17 MW
962601 AG1-109 C 50/50 2.54 MW 2.54 MW
964401 AG1-302 C Adder 13.52 MW 11.49 MW
964402 AG1-302 E Adder 9.01 MW 7.66 MW
936142 AD2-020 E 50/50 3.88 MW 3.88 MW
941551 AE2-152 C Adder 6.24 MW 5.3 MW
941552 AE2-152 E Adder 4.16 MW 3.54 MW
957371 AF2-031 C Adder 0.58 MW 0.49 MW
957372 AF2-031 E Adder 0.87 MW 0.74 MW
957841 AF2-078 C Adder 8.5 MW 7.23 MW
957842 AF2-078 E Adder 5.67 MW 4.82 MW
957891 AF2-083 C Adder 9.75 MW 8.28 MW
957892 AF2-083 E Adder 4.87 MW 4.14 MW
958011 AF2-095 C Adder 6.06 MW 5.15 MW
958012 AF2-095 E Adder 4.04 MW 3.44 MW
958381 AF2-132 C Adder 13.52 MW 11.49 MW
958382 AF2-132 E Adder 9.01 MW 7.66 MW
958391 AF2-133 C Adder 13.35 MW 11.34 MW
958392 AF2-133 E Adder 8.9 MW 7.56 MW
958402 AF2-134 E Adder 3.06 MW 2.6 MW
964861 AG1-349 C Adder 11.67 MW 9.92 MW
964862 AG1-349 E Adder 7.78 MW 6.61 MW
965791 AG1-447 C Adder 4.5 MW 3.82 MW
939161 AE1-146 C Adder -6.91 MW -5.88 MW
943961 AF1-064 C Adder -3.62 MW -3.08 MW
276675 AE2-062 E Adder 0.08 MW 0.07 MW
990142 J1224 G External Queue 34.18 MW 34.18 MW
990527 J1329 G External Queue 4.04 MW 4.04 MW
991182 J1586 G External Queue 48.19 MW 48.19 MW
955782 J1062 G External Queue 38.12 MW 38.12 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 219.9 MW 219.9 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 24.94 MW 24.94 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 9.34 MW 9.34 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.09 MW 2.09 MW
NY PJM->LTFIMP_NY CLTF 1.27 MW 1.27 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.75 MW 1.75 MW
WEC LTFEXP_WEC->PJM CLTF 2.16 MW 2.16 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.47 MW 0.47 MW
TVA LTFEXP_TVA->PJM CLTF 3.77 MW 3.77 MW
MEC LTFEXP_MEC->PJM CLTF 8.83 MW 8.83 MW
LAGN LTFEXP_LAGN->PJM CLTF 5.43 MW 5.43 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.4 MW 0.4 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 13.5 MW 13.5 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.23 MW 0.23 MW

Details for 18MOROCCO-02ALLEN 345.0 kV Ckt 1 line l/o ATSI_P7-1_TE-345-022T_SRT-A-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: ATSI/METC
Facility Description:
18MOROCCO-02ALLEN 345.0 kV Ckt 1 line
256583 to 238530 ckt 1
Contingency Name:
ATSI_P7-1_TE-345-022T_SRT-A-1
CONTINGENCY 'ATSI_P7-1_TE-345-022T_SRT-A-1'
 DISCONNECT BRANCH FROM BUS 238889 TO BUS 955780 CKT 1   /*02LEMOYN     345.0 - J1062 POI    345.0
 DISCONNECT BRANCH FROM BUS 241901 TO BUS 264612 CKT 1   /*02LALLENDORF 345.0 - 19MON12      345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 112.32 %
Rating: 1793.0 MVA
Rating Type: B
MVA to Mitigate: 2013.98 MVA
MW Contribution: 5.05 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
965681 AG1-436 C Adder 6.89 MW 5.86 MW
965682 AG1-436 E Adder 4.59 MW 3.9 MW
246397 05ELKHART HY 50/50 0.03 MW 0.03 MW
246422 05MAYFLWER 50/50 0.1 MW 0.1 MW
246431 05BUCHANAN 50/50 0.03 MW 0.03 MW
247528 05COVRT1 50/50 5.28 MW 5.28 MW
247529 05COVRT2 50/50 5.28 MW 5.28 MW
247530 05COVRT3 50/50 5.28 MW 5.28 MW
247531 05COVRT4 50/50 3.17 MW 3.17 MW
247532 05COVRT5 50/50 3.15 MW 3.15 MW
247533 05COVRT6 50/50 2.58 MW 2.58 MW
247620 Y3-023 50/50 0.07 MW 0.07 MW
247643 Z2-116 C 50/50 0.02 MW 0.02 MW
247966 05WTRV SLR E 50/50 0.28 MW 0.28 MW
247967 05OLIV SLR E Adder 0.24 MW 0.21 MW
247969 Z2-116 E 50/50 0.13 MW 0.13 MW
943001 AE2-323 C Adder 5.67 MW 4.82 MW
943002 AE2-323 E Adder 2.78 MW 2.36 MW
943021 AE2-325 C 50/50 3.59 MW 3.59 MW
943022 AE2-325 E 50/50 2.39 MW 2.39 MW
944161 AF1-084 C 50/50 6.33 MW 6.33 MW
944162 AF1-084 E 50/50 3.62 MW 3.62 MW
944961 AF1-161 C 50/50 2.87 MW 2.87 MW
945641 AF1-229 C Adder -8.25 MW -7.01 MW
960681 AF2-359 C Adder 6.89 MW 5.86 MW
960682 AF2-359 E Adder 4.59 MW 3.9 MW
960841 AF2-375 C Adder -8.9 MW -7.57 MW
960981 AF2-389 C 50/50 3.3 MW 3.3 MW
960982 AF2-389 E 50/50 2.2 MW 2.2 MW
243071 05BERRINSP G 50/50 0.06 MW 0.06 MW
243440 05CKG1 50/50 18.09 MW 18.09 MW
244412 05WTRV SLR C 50/50 0.05 MW 0.05 MW
270142 AA2-116_CT1 50/50 6.62 MW 6.62 MW
270143 AA2-116_CT2 50/50 6.62 MW 6.62 MW
270144 AA2-116_ST 50/50 5.87 MW 5.87 MW
274788 SE CHICAG;5U Adder 3.02 MW 2.56 MW
274789 SE CHICAG;6U Adder 3.02 MW 2.56 MW
274790 SE CHICAG;7U Adder 3.02 MW 2.56 MW
274791 SE CHICAG;8U Adder 3.02 MW 2.56 MW
274792 SE CHICAG;9U Adder 3.02 MW 2.57 MW
274793 SE CHICAG;0U Adder 3.02 MW 2.57 MW
274794 SE CHICAG;1U Adder 3.02 MW 2.57 MW
274795 SE CHICAG;2U Adder 3.02 MW 2.57 MW
941781 AE2-181 C Adder -7.07 MW -6.01 MW
243352 05NTRDAM 50/50 0.94 MW 0.94 MW
246416 05TWIN BRNCH 50/50 0.03 MW 0.03 MW
246476 05NILES 50/50 0.02 MW 0.02 MW
246477 05NILES 50/50 0.02 MW 0.02 MW
246536 05MOTTVILLE 50/50 0.01 MW 0.01 MW
247604 X1-042 50/50 0.08 MW 0.08 MW
270216 AD2-079_C O1 50/50 0.2 MW 0.2 MW
936632 AD2-079 E O1 50/50 0.82 MW 0.82 MW
936141 AD2-020 C 50/50 7.1 MW 7.1 MW
944932 AF1-158 E Adder 5.91 MW 5.02 MW
945111 AF1-176 C 50/50 17.31 MW 17.31 MW
945112 AF1-176 E 50/50 16.05 MW 16.05 MW
945502 AF1-215 E Adder 10.32 MW 8.77 MW
959141 AF2-205 C Adder 9.91 MW 8.43 MW
959142 AF2-205 E Adder 6.61 MW 5.62 MW
961051 AF2-396 C 50/50 22.68 MW 22.68 MW
961501 AF2-441 C Adder 6.46 MW 5.49 MW
961502 AF2-441 E Adder 9.69 MW 8.24 MW
939391 AE1-170 C 50/50 6.96 MW 6.96 MW
939392 AE1-170 E 50/50 9.61 MW 9.61 MW
940581 AE2-045 C Adder 6.89 MW 5.86 MW
940582 AE2-045 E Adder 9.46 MW 8.04 MW
962601 AG1-109 C 50/50 2.87 MW 2.87 MW
964401 AG1-302 C Adder 15.17 MW 12.89 MW
964402 AG1-302 E Adder 10.11 MW 8.59 MW
936142 AD2-020 E 50/50 4.37 MW 4.37 MW
957371 AF2-031 C Adder 0.65 MW 0.55 MW
957372 AF2-031 E Adder 0.98 MW 0.83 MW
957891 AF2-083 C 50/50 10.98 MW 10.98 MW
957892 AF2-083 E 50/50 5.49 MW 5.49 MW
958381 AF2-132 C Adder 15.17 MW 12.89 MW
958382 AF2-132 E Adder 10.11 MW 8.59 MW
958391 AF2-133 C Adder 14.97 MW 12.73 MW
958392 AF2-133 E Adder 9.98 MW 8.48 MW
958402 AF2-134 E Adder 3.44 MW 2.92 MW
964861 AG1-349 C Adder 13.09 MW 11.13 MW
964862 AG1-349 E Adder 8.73 MW 7.42 MW
965791 AG1-447 C Adder 5.05 MW 4.29 MW
939161 AE1-146 C Adder -8.68 MW -7.38 MW
943961 AF1-064 C Adder -7.32 MW -6.22 MW
955182 J996 G External Queue 28.62 MW 28.62 MW
990142 J1224 G External Queue 46.49 MW 46.49 MW
990152 J1226 External Queue 89.71 MW 89.71 MW
990527 J1329 G External Queue 5.5 MW 5.5 MW
991177 J1571 G External Queue 68.56 MW 68.56 MW
991182 J1586 G External Queue 60.05 MW 60.05 MW
991227 J1663 G External Queue 16.32 MW 16.32 MW
955782 J1062 G External Queue 43.45 MW 43.45 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 229.18 MW 229.18 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 27.68 MW 27.68 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 10.13 MW 10.13 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.31 MW 2.31 MW
NY PJM->LTFIMP_NY CLTF 1.4 MW 1.4 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.92 MW 1.92 MW
WEC LTFEXP_WEC->PJM CLTF 2.42 MW 2.42 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.5 MW 0.5 MW
TVA LTFEXP_TVA->PJM CLTF 4.17 MW 4.17 MW
MEC LTFEXP_MEC->PJM CLTF 9.87 MW 9.87 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.02 MW 6.02 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.44 MW 0.44 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 14.87 MW 14.87 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.25 MW 0.25 MW

Details for 18MOROCCO-02ALLEN 345.0 kV Ckt 1 line l/o ATSI_P7-1_TE-345-022T_SRT-A-2


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: ATSI/METC
Facility Description:
18MOROCCO-02ALLEN 345.0 kV Ckt 1 line
256583 to 238530 ckt 1
Contingency Name:
ATSI_P7-1_TE-345-022T_SRT-A-2
CONTINGENCY 'ATSI_P7-1_TE-345-022T_SRT-A-2'
 DISCONNECT BRANCH FROM BUS 241901 TO BUS 264612 CKT 1   /*02LALLENDORF 345.0 - 19MON12      345.0
 DISCONNECT BRANCH FROM BUS 264599 TO BUS 955780 CKT 1   /*19MAJTC      345.0 - J1062 POI    345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 109.89 %
Rating: 1793.0 MVA
Rating Type: B
MVA to Mitigate: 1970.28 MVA
MW Contribution: 5.05 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
965681 AG1-436 C Adder 6.89 MW 5.86 MW
965682 AG1-436 E Adder 4.59 MW 3.9 MW
246397 05ELKHART HY 50/50 0.03 MW 0.03 MW
246422 05MAYFLWER 50/50 0.1 MW 0.1 MW
246431 05BUCHANAN 50/50 0.03 MW 0.03 MW
247528 05COVRT1 50/50 5.28 MW 5.28 MW
247529 05COVRT2 50/50 5.28 MW 5.28 MW
247530 05COVRT3 50/50 5.28 MW 5.28 MW
247531 05COVRT4 50/50 3.17 MW 3.17 MW
247532 05COVRT5 50/50 3.15 MW 3.15 MW
247533 05COVRT6 50/50 2.58 MW 2.58 MW
247620 Y3-023 50/50 0.07 MW 0.07 MW
247643 Z2-116 C 50/50 0.02 MW 0.02 MW
247966 05WTRV SLR E 50/50 0.28 MW 0.28 MW
247967 05OLIV SLR E Adder 0.24 MW 0.21 MW
247969 Z2-116 E 50/50 0.13 MW 0.13 MW
943001 AE2-323 C Adder 5.67 MW 4.82 MW
943002 AE2-323 E Adder 2.78 MW 2.36 MW
943021 AE2-325 C 50/50 3.59 MW 3.59 MW
943022 AE2-325 E 50/50 2.39 MW 2.39 MW
944161 AF1-084 C 50/50 6.33 MW 6.33 MW
944162 AF1-084 E 50/50 3.62 MW 3.62 MW
944961 AF1-161 C 50/50 2.87 MW 2.87 MW
945641 AF1-229 C Adder -8.25 MW -7.01 MW
960681 AF2-359 C Adder 6.89 MW 5.86 MW
960682 AF2-359 E Adder 4.59 MW 3.9 MW
960841 AF2-375 C Adder -8.9 MW -7.57 MW
960981 AF2-389 C 50/50 3.3 MW 3.3 MW
960982 AF2-389 E 50/50 2.2 MW 2.2 MW
243071 05BERRINSP G 50/50 0.06 MW 0.06 MW
243440 05CKG1 50/50 18.09 MW 18.09 MW
244412 05WTRV SLR C 50/50 0.05 MW 0.05 MW
270142 AA2-116_CT1 50/50 6.62 MW 6.62 MW
270143 AA2-116_CT2 50/50 6.62 MW 6.62 MW
270144 AA2-116_ST 50/50 5.87 MW 5.87 MW
274788 SE CHICAG;5U Adder 3.02 MW 2.56 MW
274789 SE CHICAG;6U Adder 3.02 MW 2.56 MW
274790 SE CHICAG;7U Adder 3.02 MW 2.56 MW
274791 SE CHICAG;8U Adder 3.02 MW 2.56 MW
274792 SE CHICAG;9U Adder 3.02 MW 2.57 MW
274793 SE CHICAG;0U Adder 3.02 MW 2.57 MW
274794 SE CHICAG;1U Adder 3.02 MW 2.57 MW
274795 SE CHICAG;2U Adder 3.02 MW 2.57 MW
941781 AE2-181 C Adder -7.07 MW -6.01 MW
243352 05NTRDAM 50/50 0.94 MW 0.94 MW
246416 05TWIN BRNCH 50/50 0.03 MW 0.03 MW
246476 05NILES 50/50 0.02 MW 0.02 MW
246477 05NILES 50/50 0.02 MW 0.02 MW
246536 05MOTTVILLE 50/50 0.01 MW 0.01 MW
247604 X1-042 50/50 0.08 MW 0.08 MW
270216 AD2-079_C O1 50/50 0.2 MW 0.2 MW
936632 AD2-079 E O1 50/50 0.82 MW 0.82 MW
936141 AD2-020 C 50/50 7.1 MW 7.1 MW
944932 AF1-158 E Adder 5.91 MW 5.02 MW
945111 AF1-176 C 50/50 17.31 MW 17.31 MW
945112 AF1-176 E 50/50 16.05 MW 16.05 MW
945502 AF1-215 E Adder 10.32 MW 8.77 MW
959141 AF2-205 C Adder 9.91 MW 8.43 MW
959142 AF2-205 E Adder 6.61 MW 5.62 MW
961051 AF2-396 C 50/50 22.68 MW 22.68 MW
961501 AF2-441 C Adder 6.46 MW 5.49 MW
961502 AF2-441 E Adder 9.69 MW 8.24 MW
939391 AE1-170 C 50/50 6.96 MW 6.96 MW
939392 AE1-170 E 50/50 9.61 MW 9.61 MW
940581 AE2-045 C Adder 6.89 MW 5.86 MW
940582 AE2-045 E Adder 9.46 MW 8.04 MW
962601 AG1-109 C 50/50 2.87 MW 2.87 MW
964401 AG1-302 C Adder 15.17 MW 12.89 MW
964402 AG1-302 E Adder 10.11 MW 8.59 MW
936142 AD2-020 E 50/50 4.37 MW 4.37 MW
957371 AF2-031 C Adder 0.65 MW 0.55 MW
957372 AF2-031 E Adder 0.98 MW 0.83 MW
957891 AF2-083 C 50/50 10.98 MW 10.98 MW
957892 AF2-083 E 50/50 5.49 MW 5.49 MW
958381 AF2-132 C Adder 15.17 MW 12.89 MW
958382 AF2-132 E Adder 10.11 MW 8.59 MW
958391 AF2-133 C Adder 14.97 MW 12.73 MW
958392 AF2-133 E Adder 9.98 MW 8.48 MW
958402 AF2-134 E Adder 3.44 MW 2.92 MW
964861 AG1-349 C Adder 13.09 MW 11.13 MW
964862 AG1-349 E Adder 8.73 MW 7.42 MW
965791 AG1-447 C Adder 5.05 MW 4.29 MW
939161 AE1-146 C Adder -8.68 MW -7.38 MW
943961 AF1-064 C Adder -7.32 MW -6.22 MW
955182 J996 G External Queue 28.62 MW 28.62 MW
990142 J1224 G External Queue 46.49 MW 46.49 MW
990152 J1226 External Queue 89.71 MW 89.71 MW
990527 J1329 G External Queue 5.5 MW 5.5 MW
991177 J1571 G External Queue 68.56 MW 68.56 MW
991182 J1586 G External Queue 60.05 MW 60.05 MW
991227 J1663 G External Queue 16.32 MW 16.32 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 229.18 MW 229.18 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 27.68 MW 27.68 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 10.13 MW 10.13 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 2.31 MW 2.31 MW
NY PJM->LTFIMP_NY CLTF 1.4 MW 1.4 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.92 MW 1.92 MW
WEC LTFEXP_WEC->PJM CLTF 2.42 MW 2.42 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.5 MW 0.5 MW
TVA LTFEXP_TVA->PJM CLTF 4.17 MW 4.17 MW
MEC LTFEXP_MEC->PJM CLTF 9.87 MW 9.87 MW
LAGN LTFEXP_LAGN->PJM CLTF 6.02 MW 6.02 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.44 MW 0.44 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 14.87 MW 14.87 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.25 MW 0.25 MW

Details for J1062 POI-02LEMOYN 345.0 kV Ckt 1 line l/o ATSI_P7-1_TE-345-032T_SRT-A-1


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: ATSI/ITCT
Facility Description:
J1062 POI-02LEMOYN 345.0 kV Ckt 1 line
955780 to 238889 ckt 1
Contingency Name:
ATSI_P7-1_TE-345-032T_SRT-A-1
CONTINGENCY 'ATSI_P7-1_TE-345-032T_SRT-A-1'
 OPEN BRANCH FROM BUS 241901 TO BUS 264612 CKT 1   /*02LALLENDORF 345.0 - 19MON12      345.0
 OPEN BRANCH FROM BUS 256583 TO BUS 264594 CKT 1   /*18MOROCCO    345.0 - 19LULU       345.0
 OPEN BRANCH FROM BUS 264594 TO BUS 264613 CKT 1   /*19LULU       345.0 - 19MON34      345.0
 OPEN BRANCH FROM BUS 264594 TO BUS 264839 CKT 1   /*19LULU       345.0 - 19MILAN      345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 104.1 %
Rating: 852.0 MVA
Rating Type: B
MVA to Mitigate: 886.89 MVA
MW Contribution: 2.98 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
965681 AG1-436 C Adder 4.06 MW 3.45 MW
965682 AG1-436 E Adder 2.71 MW 2.3 MW
247966 05WTRV SLR E Adder 0.17 MW 0.14 MW
247967 05OLIV SLR E Adder 0.14 MW 0.12 MW
247969 Z2-116 E Adder 0.08 MW 0.07 MW
943001 AE2-323 C Adder 3.4 MW 2.89 MW
943002 AE2-323 E Adder 1.67 MW 1.42 MW
943021 AE2-325 C Adder 2.11 MW 1.8 MW
943022 AE2-325 E Adder 1.41 MW 1.2 MW
944161 AF1-084 C Adder 3.72 MW 3.16 MW
944162 AF1-084 E Adder 2.12 MW 1.81 MW
944961 AF1-161 C Adder 1.69 MW 1.43 MW
945641 AF1-229 C Adder -5.08 MW -4.31 MW
960681 AF2-359 C Adder 4.06 MW 3.45 MW
960682 AF2-359 E Adder 2.71 MW 2.3 MW
960841 AF2-375 C Adder -5.21 MW -4.42 MW
960981 AF2-389 C Adder 1.94 MW 1.65 MW
960982 AF2-389 E Adder 1.29 MW 1.1 MW
941781 AE2-181 C Adder -2.5 MW -2.12 MW
936632 AD2-079 E O1 Adder 0.49 MW 0.41 MW
936141 AD2-020 C Adder 4.18 MW 3.55 MW
944932 AF1-158 E Adder 3.48 MW 2.96 MW
945111 AF1-176 C Adder 10.2 MW 8.67 MW
945112 AF1-176 E Adder 9.46 MW 8.04 MW
945502 AF1-215 E Adder 6.09 MW 5.18 MW
961051 AF2-396 C Adder 13.35 MW 11.35 MW
939391 AE1-170 C Adder 4.1 MW 3.48 MW
939392 AE1-170 E Adder 5.66 MW 4.81 MW
962601 AG1-109 C Adder 1.69 MW 1.43 MW
936142 AD2-020 E Adder 2.57 MW 2.18 MW
957891 AF2-083 C Adder 6.47 MW 5.5 MW
957892 AF2-083 E Adder 3.23 MW 2.75 MW
958402 AF2-134 E Adder 2.03 MW 1.73 MW
965791 AG1-447 C Adder 2.98 MW 2.53 MW
939161 AE1-146 C Adder -5.03 MW -4.28 MW
943961 AF1-064 C Adder -3.2 MW -2.72 MW
990142 J1224 G External Queue 26.81 MW 26.81 MW
990527 J1329 G External Queue 3.17 MW 3.17 MW
991182 J1586 G External Queue 38.05 MW 38.05 MW
955782 J1062 G External Queue 96.06 MW 96.06 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 127.81 MW 127.81 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 16.34 MW 16.34 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
CBM South 2 LTFEXP_CBM-S2->PJM CBM 5.9 MW 5.9 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 1.38 MW 1.38 MW
NY PJM->LTFIMP_NY CLTF 0.84 MW 0.84 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.14 MW 1.14 MW
WEC LTFEXP_WEC->PJM CLTF 1.43 MW 1.43 MW
CPLE LTFEXP_CPLE->PJM CLTF 0.28 MW 0.28 MW
TVA LTFEXP_TVA->PJM CLTF 2.46 MW 2.46 MW
MEC LTFEXP_MEC->PJM CLTF 5.82 MW 5.82 MW
LAGN LTFEXP_LAGN->PJM CLTF 3.55 MW 3.55 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.26 MW 0.26 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 8.88 MW 8.88 MW
LTFEXP_AA2-074 LTFEXP_AA2-074->LTFIMP_AA2-074 CLTF 0.14 MW 0.14 MW

Details for 05DUMONT-05SORENS 765.0 kV Ckt 1 line l/o AEP_P7-1_#11046___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP
Facility Description:
05DUMONT-05SORENS 765.0 kV Ckt 1 line
243206 to 246999 ckt 1
Contingency Name:
AEP_P7-1_#11046___SRT-A
CONTINGENCY 'AEP_P7-1_#11046___SRT-A'
 OPEN BRANCH FROM BUS 243219 TO BUS 246955 CKT 1   /*05DUMONT     345.0 - 05OLIVE_BP   345.0
 OPEN BRANCH FROM BUS 243228 TO BUS 243234 CKT 1   /*05MERIDN     345.0 - 05TWIN B     345.0
 OPEN BRANCH FROM BUS 243232 TO BUS 246955 CKT 1   /*05SORENS     345.0 - 05OLIVE_BP   345.0
END
Contingency Type: Tower
DC|AC: AC
Final Cycle Loading: 100.58 %
Rating: 4142.0 MVA
Rating Type: B
MVA to Mitigate: 4166.19 MVA
MW Contribution: 12.24 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
272363 ESS H440 ; R Adder 4.41 MW 3.75 MW
962781 AG1-127 C Adder 11.68 MW 9.93 MW
962782 AG1-127 E Adder 7.77 MW 6.61 MW
965681 AG1-436 C 50/50 16.69 MW 16.69 MW
965682 AG1-436 E 50/50 11.13 MW 11.13 MW
966091 AG1-478 C Adder 3.35 MW 2.85 MW
966092 AG1-478 E Adder 0.84 MW 0.72 MW
966431 AG1-512 C Adder 3.44 MW 2.92 MW
966432 AG1-512 E Adder 5.16 MW 4.38 MW
966441 AG1-513 C Adder 0.84 MW 0.72 MW
966442 AG1-513 E Adder 1.26 MW 1.07 MW
247967 05OLIV SLR E Adder 0.53 MW 0.45 MW
290021 O50 E Adder 31.96 MW 27.16 MW
290051 GSG-6; E Adder 17.55 MW 14.92 MW
295109 WESTBROOK E Adder 9.4 MW 7.99 MW
295111 SUBLETTE E Adder 4.57 MW 3.88 MW
910542 X3-005 E Adder 1.2 MW 1.02 MW
918052 AA1-018 E OP Adder 26.6 MW 22.61 MW
933911 AD1-013 C Adder 3.09 MW 2.63 MW
933912 AD1-013 E Adder 4.93 MW 4.19 MW
934722 AD1-100 E Adder 149.51 MW 127.08 MW
937002 AD2-134 E Adder 16.97 MW 14.43 MW
942991 AE2-321 C Adder 13.56 MW 11.52 MW
942992 AE2-321 E Adder 6.68 MW 5.67 MW
958481 AF2-142 C Adder 18.35 MW 15.59 MW
958482 AF2-142 E Adder 12.23 MW 10.4 MW
958491 AF2-143 C Adder 18.03 MW 15.33 MW
958492 AF2-143 E Adder 12.02 MW 10.22 MW
959351 AF2-226 C Adder 4.08 MW 3.47 MW
959352 AF2-226 E Adder 6.12 MW 5.2 MW
960281 AF2-319 C Adder 4.08 MW 3.47 MW
960282 AF2-319 E Adder 6.12 MW 5.2 MW
960582 AF2-349 E Adder 60.29 MW 51.24 MW
960681 AF2-359 C 50/50 16.69 MW 16.69 MW
960682 AF2-359 E 50/50 11.13 MW 11.13 MW
960751 AF2-366 C Adder 11.64 MW 9.9 MW
960752 AF2-366 E Adder 7.76 MW 6.6 MW
243440 05CKG1 50/50 36.33 MW 36.33 MW
243441 05CKG2 50/50 55.71 MW 55.71 MW
274660 LASCO STA;1U 50/50 39.69 MW 39.69 MW
274661 LASCO STA;2U 50/50 39.82 MW 39.82 MW
274675 JOLIET 29;7U Adder 116.64 MW 99.14 MW
274676 JOLIET 29;8U Adder 116.63 MW 99.14 MW
274682 WAUKEGAN ;7U Adder 67.72 MW 57.56 MW
274683 WAUKEGAN ;8U Adder 73.05 MW 62.09 MW
274687 WILL CNTY;4U Adder 108.13 MW 91.91 MW
274771 LINCOLN ;2U 50/50 2.85 MW 2.85 MW
274772 LINCOLN ;3U 50/50 2.85 MW 2.85 MW
274773 LINCOLN ;4U 50/50 2.85 MW 2.85 MW
274774 LINCOLN ;5U 50/50 2.85 MW 2.85 MW
274775 LINCOLN ;6U 50/50 2.85 MW 2.85 MW
274776 LINCOLN ;7U 50/50 2.85 MW 2.85 MW
274777 LINCOLN ;8U 50/50 2.85 MW 2.85 MW
274788 SE CHICAG;5U Adder 7.94 MW 6.75 MW
274789 SE CHICAG;6U Adder 7.94 MW 6.75 MW
274790 SE CHICAG;7U Adder 7.94 MW 6.75 MW
274791 SE CHICAG;8U Adder 7.94 MW 6.75 MW
274792 SE CHICAG;9U Adder 7.93 MW 6.74 MW
274793 SE CHICAG;0U Adder 7.93 MW 6.74 MW
274794 SE CHICAG;1U Adder 7.93 MW 6.74 MW
274795 SE CHICAG;2U Adder 7.93 MW 6.74 MW
276591 L-013 2 Adder 6.06 MW 5.15 MW
293061 N-015 E Adder 25.38 MW 21.57 MW
293644 O22 E1 Adder 23.43 MW 19.92 MW
293645 O22 E2 Adder 26.84 MW 22.81 MW
294392 P-010 E Adder 32.23 MW 27.4 MW
933411 AC2-154 C Adder 4.06 MW 3.45 MW
933412 AC2-154 E Adder 6.62 MW 5.63 MW
957331 AF2-027 C Adder 4.1 MW 3.49 MW
957332 AF2-027 E Adder 6.16 MW 5.23 MW
274674 JOLIET 9 ;6U Adder 59.46 MW 50.54 MW
938851 AE1-113 C Adder 13.18 MW 11.21 MW
938852 AE1-113 E Adder 46.74 MW 39.73 MW
934101 AD2-000 1 Adder 9.67 MW 8.22 MW
934111 AD2-000 2 Adder 9.73 MW 8.27 MW
270100 AB1-080 CT1 50/50 8.49 MW 8.49 MW
270101 AB1-080 CT2 50/50 8.49 MW 8.49 MW
270102 AB1-080 ST 50/50 9.18 MW 9.18 MW
275149 KELLYCK ;1E Adder 29.89 MW 25.41 MW
293519 PILOT HIL;1E Adder 29.89 MW 25.41 MW
290108 LEEDK;1U E Adder 40.12 MW 34.1 MW
916221 Z1-073 E Adder 12.37 MW 10.51 MW
936292 AD2-038 E Adder 24.77 MW 21.05 MW
936371 AD2-047 C Adder 7.26 MW 6.17 MW
936372 AD2-047 E Adder 35.44 MW 30.13 MW
936461 AD2-060 C Adder 4.27 MW 3.63 MW
936511 AD2-066 C Adder 13.98 MW 11.88 MW
936512 AD2-066 E Adder 9.32 MW 7.92 MW
942421 AE2-255 C Adder 4.99 MW 4.24 MW
942422 AE2-255 E Adder 14.98 MW 12.73 MW
942651 AE2-281 C Adder 1.4 MW 1.19 MW
942652 AE2-281 E Adder 8.62 MW 7.32 MW
943121 AE2-341 C Adder 21.26 MW 18.07 MW
943122 AE2-341 E Adder 10.44 MW 8.88 MW
943591 AF1-030 C Adder 14.14 MW 12.02 MW
943592 AF1-030 E Adder 7.0 MW 5.95 MW
944932 AF1-158 E Adder 12.53 MW 10.65 MW
960591 AF2-350 C Adder 12.81 MW 10.89 MW
960592 AF2-350 E Adder 8.54 MW 7.26 MW
961501 AF2-441 C Adder 17.18 MW 14.61 MW
961502 AF2-441 E Adder 25.78 MW 21.91 MW
930481 AB1-089 C Adder 48.46 MW 41.19 MW
939321 AE1-163 C Adder 9.82 MW 8.35 MW
939322 AE1-163 E Adder 60.31 MW 51.27 MW
939351 AE1-166 C Adder 16.66 MW 14.16 MW
939352 AE1-166 E Adder 15.38 MW 13.07 MW
939401 AE1-172 C Adder 9.07 MW 7.71 MW
939402 AE1-172 E Adder 42.46 MW 36.09 MW
946671 AF1-331 C Adder 4.01 MW 3.41 MW
962691 AG1-118 C Adder 36.94 MW 31.39 MW
962692 AG1-118 E Adder 24.62 MW 20.93 MW
941551 AE2-152 C Adder 19.22 MW 16.34 MW
941552 AE2-152 E Adder 12.82 MW 10.89 MW
957371 AF2-031 C Adder 1.72 MW 1.46 MW
957372 AF2-031 E Adder 2.58 MW 2.19 MW
958011 AF2-095 C Adder 18.45 MW 15.68 MW
958012 AF2-095 E Adder 12.3 MW 10.45 MW
965791 AG1-447 C 50/50 12.24 MW 12.24 MW
274770 LINCOLN ;1U 50/50 2.85 MW 2.85 MW
276675 AE2-062 E Adder 0.25 MW 0.21 MW
276170 Z1-108 E Adder 4.84 MW 4.11 MW
920272 AA2-123 E Adder 4.77 MW 4.05 MW
CBM West 1 LTFEXP_CBM-W1->PJM CBM 235.99 MW 235.99 MW
CBM West 2 LTFEXP_CBM-W2->PJM CBM 46.63 MW 46.63 MW
CBM South 1 LTFEXP_CBM-S1->PJM CBM 0.0 MW 0.0 MW
G-007 PJM->LTFIMP_G-007 CMTX_NF 5.22 MW 5.22 MW
NY PJM->LTFIMP_NY CLTF 2.76 MW 2.76 MW
LGEE LTFEXP_LGEE->PJM CLTF 1.66 MW 1.66 MW
WEC LTFEXP_WEC->PJM CLTF 6.5 MW 6.5 MW
HAMLET PJM->LTFIMP_HAMLET CLTF 0.92 MW 0.92 MW
CATAWBA PJM->LTFIMP_CATAWBA CLTF 0.41 MW 0.41 MW
TVA LTFEXP_TVA->PJM CLTF 5.17 MW 5.17 MW
MEC LTFEXP_MEC->PJM CLTF 23.97 MW 23.97 MW
LAGN LTFEXP_LAGN->PJM CLTF 9.44 MW 9.44 MW
SIGE LTFEXP_SIGE->PJM CLTF 0.56 MW 0.56 MW
O66 PJM->LTFIMP_O-066 CMTX_NF 33.48 MW 33.48 MW
LTFEXP_AC1-131 LTFEXP_AC1-131->LTFIMP_AC1-131 CLTF 1.47 MW 1.47 MW

Summer Potential Congestion due to Local Energy Deliverability

PJM also studied the delivery of the energy portion of this interconnection request. Any problems identified below are likely to result in operational restrictions to the project under study. The developer can proceed with network upgrades to eliminate the operational restriction at their discretion by submitting an Upgrade Request into the New Service Request process.

Note: Only the most severely overloaded conditions are listed below. There is no guarantee of full delivery of energy for this project by fixing only the conditions listed in this section. With an Upgrade Request, a subsequent analysis will be performed which shall study all overload conditions associated with the overloaded element(s) identified.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

Winter Peak Analysis

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Winter Potential Congestion due to Local Energy Deliverability

PJM will start performing Winter Peak analysis in Transition Cycle 2.

Light Load Analysis

The New Service Request was evaluated as a 55.0 MW injection and 55.0 MW withdrawal in the AEP area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential light load period network impacts were as follows:

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

Area Facility Description Contingency Name Contingency Type DC|AC Final Cycle Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single AC 123.83 % 970.0 STE 1201.18 8.32
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single AC 123.71 % 970.0 STE 1200.03 8.32
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Single DC 123.08 % 971.0 B 1195.08 46.68
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Single DC 123.08 % 971.0 B 1195.08 46.68
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Breaker AC 115.29 % 971.0 B 1119.5 46.68
AEP/CE AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Breaker AC 115.29 % 971.0 B 1119.49 46.68
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Breaker AC 112.39 % 970.0 STE 1090.2 8.32
CE UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Breaker AC 112.39 % 970.0 STE 1090.18 8.32

Details for UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
Contingency Name:
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 123.83 %
Rating: 970.0 MVA
Rating Type: STE
MVA to Mitigate: 1201.18 MVA
MW Contribution: 8.32 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
274847 GR RIDGE ;BU 80/20 0.73 MW 0.73 MW
274848 CAMPGROVE;RU 80/20 0.28 MW 0.28 MW
274849 CRESCENT ;1U 80/20 0.21 MW 0.21 MW
274850 MENDOTA H;RU 80/20 0.35 MW 0.35 MW
274851 PROVIDENC;RU 80/20 0.23 MW 0.23 MW
274853 TWINGROVE;U1 80/20 0.63 MW 0.63 MW
274854 TWINGROVE;U2 80/20 0.65 MW 0.65 MW
274855 GSG-6 ;RU 80/20 0.54 MW 0.54 MW
274856 ECOGROVE ;U1 80/20 0.46 MW 0.46 MW
274857 BIG SKY ;U1 80/20 0.35 MW 0.35 MW
274858 BIG SKY ;U2 80/20 0.35 MW 0.35 MW
274859 EASYR;U1 E 80/20 2.44 MW 2.44 MW
274860 EASYR;U2 E 80/20 2.44 MW 2.44 MW
274861 TOP CROP ;1U 80/20 0.45 MW 0.45 MW
274862 TOP CROP ;2U 80/20 0.86 MW 0.86 MW
274863 CAYUGA RI;1U 80/20 0.52 MW 0.52 MW
274864 CAYUGA RI;2U 80/20 0.52 MW 0.52 MW
274871 GR RIDGE ;2U 80/20 0.27 MW 0.27 MW
274872 LEE DEKAL;1U 80/20 0.99 MW 0.99 MW
274877 BISHOP HL;1U 80/20 0.43 MW 0.43 MW
274878 BISHOP HL;2U 80/20 0.43 MW 0.43 MW
274879 MINONK ;1U 80/20 0.99 MW 0.99 MW
274880 RADFORD R;1U 80/20 0.66 MW 0.66 MW
274887 PILOT HIL;1U 80/20 0.95 MW 0.95 MW
274888 KELLY CRK;1U 80/20 0.95 MW 0.95 MW
276156 O-029 C 80/20 0.25 MW 0.25 MW
276157 O-029 C 80/20 0.45 MW 0.45 MW
276158 O-029 C 80/20 0.45 MW 0.45 MW
276615 W2-048 GEN 80/20 0.89 MW 0.89 MW
276621 X2-022 GEN 80/20 2.54 MW 2.54 MW
290021 O50 E 80/20 3.96 MW 3.96 MW
290051 GSG-6; E 80/20 2.14 MW 2.14 MW
290108 LEEDK;1U E 80/20 4.91 MW 4.91 MW
290261 S-027 E 80/20 2.96 MW 2.96 MW
290265 S-028 E 80/20 2.94 MW 2.94 MW
293061 N-015 E 80/20 3.2 MW 3.2 MW
293644 O22 E1 80/20 2.82 MW 2.82 MW
293645 O22 E2 80/20 3.23 MW 3.23 MW
293715 O-029 E 80/20 1.97 MW 1.97 MW
293716 O-029 E 80/20 1.08 MW 1.08 MW
293717 O-029 E 80/20 0.99 MW 0.99 MW
293771 O-035 E 80/20 1.39 MW 1.39 MW
294392 P-010 E 80/20 4.06 MW 4.06 MW
294401 BSHIL;1U E 80/20 1.73 MW 1.73 MW
294410 BSHIL;2U E 80/20 1.73 MW 1.73 MW
294763 P-046 E 80/20 1.92 MW 1.92 MW
295109 WESTBROOK E 80/20 1.15 MW 1.15 MW
295111 SUBLETTE E 80/20 0.56 MW 0.56 MW
917502 Z2-087 E 80/20 3.33 MW 3.33 MW
918052 AA1-018 E OP 80/20 3.62 MW 3.62 MW
925581 AC1-033 C 80/20 0.46 MW 0.46 MW
925582 AC1-033 E 80/20 3.04 MW 3.04 MW
934721 AD1-100 C 80/20 3.82 MW 3.82 MW
934722 AD1-100 E 80/20 59.45 MW 59.45 MW
937001 AD2-134 C 80/20 0.83 MW 0.83 MW
937002 AD2-134 E 80/20 3.31 MW 3.31 MW
942111 AE2-223 C 80/20 1.2 MW 1.2 MW
942112 AE2-223 E 80/20 8.0 MW 8.0 MW
957331 AF2-027 C 80/20 2.05 MW 2.05 MW
957332 AF2-027 E 80/20 3.08 MW 3.08 MW
959351 AF2-226 C 80/20 1.96 MW 1.96 MW
959352 AF2-226 E 80/20 2.94 MW 2.94 MW
959611 AF2-252 C 80/20 1.45 MW 1.45 MW
959612 AF2-252 E 80/20 2.18 MW 2.18 MW
960281 AF2-319 C 80/20 1.96 MW 1.96 MW
960282 AF2-319 E 80/20 2.94 MW 2.94 MW
960611 AF2-352 C 80/20 1.45 MW 1.45 MW
960612 AF2-352 E 80/20 2.18 MW 2.18 MW
962012 AG1-044 E 80/20 0.04 MW 0.04 MW
966091 AG1-478 C 80/20 0.43 MW 0.43 MW
966092 AG1-478 E 80/20 0.65 MW 0.65 MW
966431 AG1-512 C 80/20 3.76 MW 3.76 MW
966432 AG1-512 E 80/20 5.63 MW 5.63 MW
966441 AG1-513 C 80/20 0.42 MW 0.42 MW
966442 AG1-513 E 80/20 0.63 MW 0.63 MW
274674 JOLIET 9 ;6U 80/20 13.64 MW 13.64 MW
274675 JOLIET 29;7U 80/20 36.25 MW 36.25 MW
274676 JOLIET 29;8U 80/20 36.24 MW 36.24 MW
274682 WAUKEGAN ;7U 80/20 15.27 MW 15.27 MW
274683 WAUKEGAN ;8U 80/20 16.46 MW 16.46 MW
274687 WILL CNTY;4U 80/20 32.59 MW 32.59 MW
274890 CAYUG;1U E 80/20 2.75 MW 2.75 MW
274891 CAYUG;2U E 80/20 2.75 MW 2.75 MW
925771 AC1-053 C 80/20 0.59 MW 0.59 MW
925772 AC1-053 E 80/20 3.95 MW 3.95 MW
938851 AE1-113 C 80/20 5.23 MW 5.23 MW
938852 AE1-113 E 80/20 18.55 MW 18.55 MW
939401 AE1-172 C 80/20 3.45 MW 3.45 MW
939402 AE1-172 E 80/20 16.15 MW 16.15 MW
942651 AE2-281 C 80/20 0.59 MW 0.59 MW
942652 AE2-281 E 80/20 3.64 MW 3.64 MW
270681 BRIGHTSTK; R 80/20 0.5 MW 0.5 MW
270839 OTTER CRK; R 80/20 0.54 MW 0.54 MW
274881 WALNUT RG;1U 80/20 0.95 MW 0.95 MW
275149 KELLYCK ;1E 80/20 3.79 MW 3.79 MW
276174 W4-005 E 80/20 3.77 MW 3.77 MW
276602 WESTBROOK C 80/20 0.17 MW 0.17 MW
276603 SUBLETTE C 80/20 0.08 MW 0.08 MW
276626 AG1-044 E 80/20 0.05 MW 0.05 MW
276627 AG1-044 BAT 80/20 0.01 MW 0.01 MW
276645 AC1-214 C1 80/20 0.19 MW 0.19 MW
276646 AC1-214 C2 80/20 0.19 MW 0.19 MW
276655 AB2-047 C1 80/20 0.31 MW 0.31 MW
276656 AB2-047 C2 80/20 0.31 MW 0.31 MW
276668 AB2-070 C 80/20 0.38 MW 0.38 MW
276675 AE2-062 E 80/20 0.11 MW 0.11 MW
293516 O-009 E 80/20 3.81 MW 3.81 MW
293519 PILOT HIL;1E 80/20 3.79 MW 3.79 MW
916212 CRESCENT ;1U 80/20 0.98 MW 0.98 MW
916221 Z1-073 E 80/20 1.51 MW 1.51 MW
924048 AB2-047 E1 80/20 2.07 MW 2.07 MW
924049 AB2-047 E2 80/20 2.1 MW 2.1 MW
924266 AB2-070 E 80/20 2.27 MW 2.27 MW
926821 AC1-168 C 80/20 0.74 MW 0.74 MW
926822 AC1-168 E 80/20 4.98 MW 4.98 MW
927208 AC1-214 E1 80/20 0.66 MW 0.66 MW
927209 AC1-214 E2 80/20 0.66 MW 0.66 MW
935141 AD1-148 C 80/20 0.8 MW 0.8 MW
936371 AD2-047 C 80/20 2.94 MW 2.94 MW
936372 AD2-047 E 80/20 14.37 MW 14.37 MW
938861 AE1-114 C 80/20 2.56 MW 2.56 MW
938862 AE1-114 E 80/20 8.72 MW 8.72 MW
939321 AE1-163 C 80/20 4.15 MW 4.15 MW
939322 AE1-163 E 80/20 25.5 MW 25.5 MW
941731 AE2-173 C 80/20 3.83 MW 3.83 MW
942421 AE2-255 C 80/20 1.98 MW 1.98 MW
942422 AE2-255 E 80/20 5.95 MW 5.95 MW
946321 AF1-296 C 80/20 2.29 MW 2.29 MW
946322 AF1-296 E 80/20 10.74 MW 10.74 MW
957371 AF2-031 C 80/20 0.64 MW 0.64 MW
957372 AF2-031 E 80/20 0.95 MW 0.95 MW
957751 AF2-069 C 80/20 0.14 MW 0.14 MW
957752 AF2-069 E 80/20 0.45 MW 0.45 MW
960261 AF2-317 C 80/20 0.34 MW 0.34 MW
961011 AF2-392 C 80/20 2.57 MW 2.57 MW
961012 AF2-392 E 80/20 11.97 MW 11.97 MW
961501 AF2-441 C 80/20 6.93 MW 6.93 MW
961502 AF2-441 E 80/20 10.4 MW 10.4 MW
963831 AG1-236 C 80/20 1.06 MW 1.06 MW
963832 AG1-236 E 80/20 7.11 MW 7.11 MW
965331 AG1-398 C 80/20 0.17 MW 0.17 MW
990901 L-005 E 80/20 2.56 MW 2.56 MW
276170 Z1-108 E 80/20 2.04 MW 2.04 MW
920272 AA2-123 E 80/20 2.0 MW 2.0 MW
965793 AG1-447 BT 80/20 8.32 MW 8.32 MW

Details for UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
Contingency Name:
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Single
DC|AC: AC
Final Cycle Loading: 123.71 %
Rating: 970.0 MVA
Rating Type: STE
MVA to Mitigate: 1200.03 MVA
MW Contribution: 8.32 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
274847 GR RIDGE ;BU 80/20 0.73 MW 0.73 MW
274848 CAMPGROVE;RU 80/20 0.28 MW 0.28 MW
274849 CRESCENT ;1U 80/20 0.21 MW 0.21 MW
274850 MENDOTA H;RU 80/20 0.35 MW 0.35 MW
274851 PROVIDENC;RU 80/20 0.23 MW 0.23 MW
274853 TWINGROVE;U1 80/20 0.63 MW 0.63 MW
274854 TWINGROVE;U2 80/20 0.65 MW 0.65 MW
274855 GSG-6 ;RU 80/20 0.54 MW 0.54 MW
274856 ECOGROVE ;U1 80/20 0.46 MW 0.46 MW
274857 BIG SKY ;U1 80/20 0.35 MW 0.35 MW
274858 BIG SKY ;U2 80/20 0.35 MW 0.35 MW
274859 EASYR;U1 E 80/20 2.44 MW 2.44 MW
274860 EASYR;U2 E 80/20 2.44 MW 2.44 MW
274861 TOP CROP ;1U 80/20 0.45 MW 0.45 MW
274862 TOP CROP ;2U 80/20 0.86 MW 0.86 MW
274863 CAYUGA RI;1U 80/20 0.52 MW 0.52 MW
274864 CAYUGA RI;2U 80/20 0.52 MW 0.52 MW
274871 GR RIDGE ;2U 80/20 0.27 MW 0.27 MW
274872 LEE DEKAL;1U 80/20 0.99 MW 0.99 MW
274877 BISHOP HL;1U 80/20 0.43 MW 0.43 MW
274878 BISHOP HL;2U 80/20 0.43 MW 0.43 MW
274879 MINONK ;1U 80/20 0.99 MW 0.99 MW
274880 RADFORD R;1U 80/20 0.66 MW 0.66 MW
274887 PILOT HIL;1U 80/20 0.95 MW 0.95 MW
274888 KELLY CRK;1U 80/20 0.95 MW 0.95 MW
276156 O-029 C 80/20 0.25 MW 0.25 MW
276157 O-029 C 80/20 0.45 MW 0.45 MW
276158 O-029 C 80/20 0.45 MW 0.45 MW
276615 W2-048 GEN 80/20 0.89 MW 0.89 MW
276621 X2-022 GEN 80/20 2.54 MW 2.54 MW
290021 O50 E 80/20 3.96 MW 3.96 MW
290051 GSG-6; E 80/20 2.14 MW 2.14 MW
290108 LEEDK;1U E 80/20 4.91 MW 4.91 MW
290261 S-027 E 80/20 2.96 MW 2.96 MW
290265 S-028 E 80/20 2.94 MW 2.94 MW
293061 N-015 E 80/20 3.2 MW 3.2 MW
293644 O22 E1 80/20 2.82 MW 2.82 MW
293645 O22 E2 80/20 3.23 MW 3.23 MW
293715 O-029 E 80/20 1.97 MW 1.97 MW
293716 O-029 E 80/20 1.08 MW 1.08 MW
293717 O-029 E 80/20 0.99 MW 0.99 MW
293771 O-035 E 80/20 1.39 MW 1.39 MW
294392 P-010 E 80/20 4.06 MW 4.06 MW
294401 BSHIL;1U E 80/20 1.73 MW 1.73 MW
294410 BSHIL;2U E 80/20 1.73 MW 1.73 MW
294763 P-046 E 80/20 1.92 MW 1.92 MW
295109 WESTBROOK E 80/20 1.15 MW 1.15 MW
295111 SUBLETTE E 80/20 0.56 MW 0.56 MW
917502 Z2-087 E 80/20 3.33 MW 3.33 MW
918052 AA1-018 E OP 80/20 3.62 MW 3.62 MW
925581 AC1-033 C 80/20 0.46 MW 0.46 MW
925582 AC1-033 E 80/20 3.04 MW 3.04 MW
934721 AD1-100 C 80/20 3.82 MW 3.82 MW
934722 AD1-100 E 80/20 59.45 MW 59.45 MW
937001 AD2-134 C 80/20 0.83 MW 0.83 MW
937002 AD2-134 E 80/20 3.31 MW 3.31 MW
942111 AE2-223 C 80/20 1.2 MW 1.2 MW
942112 AE2-223 E 80/20 8.0 MW 8.0 MW
957331 AF2-027 C 80/20 2.05 MW 2.05 MW
957332 AF2-027 E 80/20 3.08 MW 3.08 MW
959351 AF2-226 C 80/20 1.96 MW 1.96 MW
959352 AF2-226 E 80/20 2.94 MW 2.94 MW
959611 AF2-252 C 80/20 1.45 MW 1.45 MW
959612 AF2-252 E 80/20 2.18 MW 2.18 MW
960281 AF2-319 C 80/20 1.96 MW 1.96 MW
960282 AF2-319 E 80/20 2.94 MW 2.94 MW
960611 AF2-352 C 80/20 1.45 MW 1.45 MW
960612 AF2-352 E 80/20 2.18 MW 2.18 MW
962012 AG1-044 E 80/20 0.04 MW 0.04 MW
966091 AG1-478 C 80/20 0.43 MW 0.43 MW
966092 AG1-478 E 80/20 0.65 MW 0.65 MW
966431 AG1-512 C 80/20 3.76 MW 3.76 MW
966432 AG1-512 E 80/20 5.63 MW 5.63 MW
966441 AG1-513 C 80/20 0.42 MW 0.42 MW
966442 AG1-513 E 80/20 0.63 MW 0.63 MW
274674 JOLIET 9 ;6U 80/20 13.64 MW 13.64 MW
274675 JOLIET 29;7U 80/20 36.25 MW 36.25 MW
274676 JOLIET 29;8U 80/20 36.24 MW 36.24 MW
274682 WAUKEGAN ;7U 80/20 15.27 MW 15.27 MW
274683 WAUKEGAN ;8U 80/20 16.46 MW 16.46 MW
274687 WILL CNTY;4U 80/20 32.59 MW 32.59 MW
274890 CAYUG;1U E 80/20 2.75 MW 2.75 MW
274891 CAYUG;2U E 80/20 2.75 MW 2.75 MW
925771 AC1-053 C 80/20 0.59 MW 0.59 MW
925772 AC1-053 E 80/20 3.95 MW 3.95 MW
938851 AE1-113 C 80/20 5.23 MW 5.23 MW
938852 AE1-113 E 80/20 18.55 MW 18.55 MW
939401 AE1-172 C 80/20 3.45 MW 3.45 MW
939402 AE1-172 E 80/20 16.15 MW 16.15 MW
942651 AE2-281 C 80/20 0.59 MW 0.59 MW
942652 AE2-281 E 80/20 3.64 MW 3.64 MW
270681 BRIGHTSTK; R 80/20 0.5 MW 0.5 MW
270839 OTTER CRK; R 80/20 0.54 MW 0.54 MW
274881 WALNUT RG;1U 80/20 0.95 MW 0.95 MW
275149 KELLYCK ;1E 80/20 3.79 MW 3.79 MW
276174 W4-005 E 80/20 3.77 MW 3.77 MW
276602 WESTBROOK C 80/20 0.17 MW 0.17 MW
276603 SUBLETTE C 80/20 0.08 MW 0.08 MW
276626 AG1-044 E 80/20 0.05 MW 0.05 MW
276627 AG1-044 BAT 80/20 0.01 MW 0.01 MW
276645 AC1-214 C1 80/20 0.19 MW 0.19 MW
276646 AC1-214 C2 80/20 0.19 MW 0.19 MW
276655 AB2-047 C1 80/20 0.31 MW 0.31 MW
276656 AB2-047 C2 80/20 0.31 MW 0.31 MW
276668 AB2-070 C 80/20 0.38 MW 0.38 MW
276675 AE2-062 E 80/20 0.11 MW 0.11 MW
293516 O-009 E 80/20 3.81 MW 3.81 MW
293519 PILOT HIL;1E 80/20 3.79 MW 3.79 MW
916212 CRESCENT ;1U 80/20 0.98 MW 0.98 MW
916221 Z1-073 E 80/20 1.51 MW 1.51 MW
924048 AB2-047 E1 80/20 2.07 MW 2.07 MW
924049 AB2-047 E2 80/20 2.1 MW 2.1 MW
924266 AB2-070 E 80/20 2.27 MW 2.27 MW
926821 AC1-168 C 80/20 0.74 MW 0.74 MW
926822 AC1-168 E 80/20 4.98 MW 4.98 MW
927208 AC1-214 E1 80/20 0.66 MW 0.66 MW
927209 AC1-214 E2 80/20 0.66 MW 0.66 MW
935141 AD1-148 C 80/20 0.8 MW 0.8 MW
936371 AD2-047 C 80/20 2.94 MW 2.94 MW
936372 AD2-047 E 80/20 14.37 MW 14.37 MW
938861 AE1-114 C 80/20 2.56 MW 2.56 MW
938862 AE1-114 E 80/20 8.72 MW 8.72 MW
939321 AE1-163 C 80/20 4.15 MW 4.15 MW
939322 AE1-163 E 80/20 25.5 MW 25.5 MW
941731 AE2-173 C 80/20 3.83 MW 3.83 MW
942421 AE2-255 C 80/20 1.98 MW 1.98 MW
942422 AE2-255 E 80/20 5.95 MW 5.95 MW
946321 AF1-296 C 80/20 2.29 MW 2.29 MW
946322 AF1-296 E 80/20 10.74 MW 10.74 MW
957371 AF2-031 C 80/20 0.64 MW 0.64 MW
957372 AF2-031 E 80/20 0.95 MW 0.95 MW
957751 AF2-069 C 80/20 0.14 MW 0.14 MW
957752 AF2-069 E 80/20 0.45 MW 0.45 MW
960261 AF2-317 C 80/20 0.34 MW 0.34 MW
961011 AF2-392 C 80/20 2.57 MW 2.57 MW
961012 AF2-392 E 80/20 11.97 MW 11.97 MW
961501 AF2-441 C 80/20 6.93 MW 6.93 MW
961502 AF2-441 E 80/20 10.4 MW 10.4 MW
963831 AG1-236 C 80/20 1.06 MW 1.06 MW
963832 AG1-236 E 80/20 7.11 MW 7.11 MW
965331 AG1-398 C 80/20 0.17 MW 0.17 MW
990901 L-005 E 80/20 2.56 MW 2.56 MW
276170 Z1-108 E 80/20 2.04 MW 2.04 MW
920272 AA2-123 E 80/20 2.0 MW 2.0 MW
965793 AG1-447 BT 80/20 8.32 MW 8.32 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o 765-L11215__-S_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
765-L11215__-S_SRT-A
CONTINGENCY '765-L11215__-S_SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
END
Contingency Type: Single
DC|AC: DC
Final Cycle Loading: 123.08 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1195.08 MVA
MW Contribution: 46.68 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
274847 GR RIDGE ;BU 80/20 0.73 MW 0.73 MW
274848 CAMPGROVE;RU 80/20 0.28 MW 0.28 MW
274849 CRESCENT ;1U 80/20 0.21 MW 0.21 MW
274850 MENDOTA H;RU 80/20 0.35 MW 0.35 MW
274851 PROVIDENC;RU 80/20 0.23 MW 0.23 MW
274853 TWINGROVE;U1 80/20 0.63 MW 0.63 MW
274854 TWINGROVE;U2 80/20 0.65 MW 0.65 MW
274855 GSG-6 ;RU 80/20 0.54 MW 0.54 MW
274856 ECOGROVE ;U1 80/20 0.46 MW 0.46 MW
274857 BIG SKY ;U1 80/20 0.35 MW 0.35 MW
274858 BIG SKY ;U2 80/20 0.35 MW 0.35 MW
274859 EASYR;U1 E 80/20 2.44 MW 2.44 MW
274860 EASYR;U2 E 80/20 2.44 MW 2.44 MW
274861 TOP CROP ;1U 80/20 0.45 MW 0.45 MW
274862 TOP CROP ;2U 80/20 0.86 MW 0.86 MW
274863 CAYUGA RI;1U 80/20 0.52 MW 0.52 MW
274864 CAYUGA RI;2U 80/20 0.52 MW 0.52 MW
274871 GR RIDGE ;2U 80/20 0.27 MW 0.27 MW
274872 LEE DEKAL;1U 80/20 0.99 MW 0.99 MW
274877 BISHOP HL;1U 80/20 0.43 MW 0.43 MW
274878 BISHOP HL;2U 80/20 0.43 MW 0.43 MW
274879 MINONK ;1U 80/20 0.99 MW 0.99 MW
274880 RADFORD R;1U 80/20 0.66 MW 0.66 MW
274887 PILOT HIL;1U 80/20 0.95 MW 0.95 MW
274888 KELLY CRK;1U 80/20 0.95 MW 0.95 MW
276156 O-029 C 80/20 0.25 MW 0.25 MW
276157 O-029 C 80/20 0.45 MW 0.45 MW
276158 O-029 C 80/20 0.45 MW 0.45 MW
276615 W2-048 GEN 80/20 0.89 MW 0.89 MW
276621 X2-022 GEN 80/20 2.54 MW 2.54 MW
290021 O50 E 80/20 3.96 MW 3.96 MW
290051 GSG-6; E 80/20 2.14 MW 2.14 MW
290108 LEEDK;1U E 80/20 4.91 MW 4.91 MW
290261 S-027 E 80/20 2.96 MW 2.96 MW
290265 S-028 E 80/20 2.94 MW 2.94 MW
293061 N-015 E 80/20 3.2 MW 3.2 MW
293644 O22 E1 80/20 2.82 MW 2.82 MW
293645 O22 E2 80/20 3.23 MW 3.23 MW
293715 O-029 E 80/20 1.97 MW 1.97 MW
293716 O-029 E 80/20 1.08 MW 1.08 MW
293717 O-029 E 80/20 0.99 MW 0.99 MW
293771 O-035 E 80/20 1.39 MW 1.39 MW
294392 P-010 E 80/20 4.06 MW 4.06 MW
294401 BSHIL;1U E 80/20 1.73 MW 1.73 MW
294410 BSHIL;2U E 80/20 1.73 MW 1.73 MW
294763 P-046 E 80/20 1.92 MW 1.92 MW
295109 WESTBROOK E 80/20 1.15 MW 1.15 MW
295111 SUBLETTE E 80/20 0.56 MW 0.56 MW
917502 Z2-087 E 80/20 3.33 MW 3.33 MW
918052 AA1-018 E OP 80/20 3.62 MW 3.62 MW
925581 AC1-033 C 80/20 0.46 MW 0.46 MW
925582 AC1-033 E 80/20 3.04 MW 3.04 MW
934721 AD1-100 C 80/20 3.82 MW 3.82 MW
934722 AD1-100 E 80/20 59.45 MW 59.45 MW
937001 AD2-134 C 80/20 0.83 MW 0.83 MW
937002 AD2-134 E 80/20 3.31 MW 3.31 MW
942111 AE2-223 C 80/20 1.2 MW 1.2 MW
942112 AE2-223 E 80/20 8.0 MW 8.0 MW
957331 AF2-027 C 80/20 2.05 MW 2.05 MW
957332 AF2-027 E 80/20 3.08 MW 3.08 MW
959351 AF2-226 C 80/20 1.96 MW 1.96 MW
959352 AF2-226 E 80/20 2.94 MW 2.94 MW
959611 AF2-252 C 80/20 1.45 MW 1.45 MW
959612 AF2-252 E 80/20 2.18 MW 2.18 MW
960281 AF2-319 C 80/20 1.96 MW 1.96 MW
960282 AF2-319 E 80/20 2.94 MW 2.94 MW
960611 AF2-352 C 80/20 1.45 MW 1.45 MW
960612 AF2-352 E 80/20 2.18 MW 2.18 MW
962012 AG1-044 E 80/20 0.04 MW 0.04 MW
966091 AG1-478 C 80/20 0.43 MW 0.43 MW
966092 AG1-478 E 80/20 0.65 MW 0.65 MW
966431 AG1-512 C 80/20 3.76 MW 3.76 MW
966432 AG1-512 E 80/20 5.63 MW 5.63 MW
966441 AG1-513 C 80/20 0.42 MW 0.42 MW
966442 AG1-513 E 80/20 0.63 MW 0.63 MW
274674 JOLIET 9 ;6U 80/20 13.64 MW 13.64 MW
274675 JOLIET 29;7U 80/20 36.25 MW 36.25 MW
274676 JOLIET 29;8U 80/20 36.24 MW 36.24 MW
274682 WAUKEGAN ;7U 80/20 15.27 MW 15.27 MW
274683 WAUKEGAN ;8U 80/20 16.46 MW 16.46 MW
274687 WILL CNTY;4U 80/20 32.59 MW 32.59 MW
274890 CAYUG;1U E 80/20 2.75 MW 2.75 MW
274891 CAYUG;2U E 80/20 2.75 MW 2.75 MW
925771 AC1-053 C 80/20 0.59 MW 0.59 MW
925772 AC1-053 E 80/20 3.95 MW 3.95 MW
938851 AE1-113 C 80/20 5.23 MW 5.23 MW
938852 AE1-113 E 80/20 18.55 MW 18.55 MW
939401 AE1-172 C 80/20 3.45 MW 3.45 MW
939402 AE1-172 E 80/20 16.15 MW 16.15 MW
942651 AE2-281 C 80/20 0.59 MW 0.59 MW
942652 AE2-281 E 80/20 3.64 MW 3.64 MW
270681 BRIGHTSTK; R 80/20 0.5 MW 0.5 MW
270839 OTTER CRK; R 80/20 0.54 MW 0.54 MW
274881 WALNUT RG;1U 80/20 0.95 MW 0.95 MW
275149 KELLYCK ;1E 80/20 3.79 MW 3.79 MW
276174 W4-005 E 80/20 3.77 MW 3.77 MW
276602 WESTBROOK C 80/20 0.17 MW 0.17 MW
276603 SUBLETTE C 80/20 0.08 MW 0.08 MW
276626 AG1-044 E 80/20 0.05 MW 0.05 MW
276627 AG1-044 BAT 80/20 0.01 MW 0.01 MW
276645 AC1-214 C1 80/20 0.19 MW 0.19 MW
276646 AC1-214 C2 80/20 0.19 MW 0.19 MW
276655 AB2-047 C1 80/20 0.31 MW 0.31 MW
276656 AB2-047 C2 80/20 0.31 MW 0.31 MW
276668 AB2-070 C 80/20 0.38 MW 0.38 MW
276675 AE2-062 E 80/20 0.11 MW 0.11 MW
293516 O-009 E 80/20 3.81 MW 3.81 MW
293519 PILOT HIL;1E 80/20 3.79 MW 3.79 MW
916212 CRESCENT ;1U 80/20 0.98 MW 0.98 MW
916221 Z1-073 E 80/20 1.51 MW 1.51 MW
924048 AB2-047 E1 80/20 2.07 MW 2.07 MW
924049 AB2-047 E2 80/20 2.1 MW 2.1 MW
924266 AB2-070 E 80/20 2.27 MW 2.27 MW
926821 AC1-168 C 80/20 0.74 MW 0.74 MW
926822 AC1-168 E 80/20 4.98 MW 4.98 MW
927208 AC1-214 E1 80/20 0.66 MW 0.66 MW
927209 AC1-214 E2 80/20 0.66 MW 0.66 MW
935141 AD1-148 C 80/20 0.8 MW 0.8 MW
936371 AD2-047 C 80/20 2.94 MW 2.94 MW
936372 AD2-047 E 80/20 14.37 MW 14.37 MW
938861 AE1-114 C 80/20 2.56 MW 2.56 MW
938862 AE1-114 E 80/20 8.72 MW 8.72 MW
939321 AE1-163 C 80/20 4.15 MW 4.15 MW
939322 AE1-163 E 80/20 25.5 MW 25.5 MW
941731 AE2-173 C 80/20 3.83 MW 3.83 MW
942421 AE2-255 C 80/20 1.98 MW 1.98 MW
942422 AE2-255 E 80/20 5.95 MW 5.95 MW
946321 AF1-296 C 80/20 2.29 MW 2.29 MW
946322 AF1-296 E 80/20 10.74 MW 10.74 MW
957371 AF2-031 C 80/20 0.64 MW 0.64 MW
957372 AF2-031 E 80/20 0.95 MW 0.95 MW
957751 AF2-069 C 80/20 0.14 MW 0.14 MW
957752 AF2-069 E 80/20 0.45 MW 0.45 MW
960261 AF2-317 C 80/20 0.34 MW 0.34 MW
961011 AF2-392 C 80/20 2.57 MW 2.57 MW
961012 AF2-392 E 80/20 11.97 MW 11.97 MW
961501 AF2-441 C 80/20 6.93 MW 6.93 MW
961502 AF2-441 E 80/20 10.4 MW 10.4 MW
963831 AG1-236 C 80/20 1.06 MW 1.06 MW
963832 AG1-236 E 80/20 7.11 MW 7.11 MW
965331 AG1-398 C 80/20 0.17 MW 0.17 MW
965791 AG1-447 C 80/20 46.68 MW 46.68 MW
990901 L-005 E 80/20 2.56 MW 2.56 MW
276170 Z1-108 E 80/20 2.04 MW 2.04 MW
920272 AA2-123 E 80/20 2.0 MW 2.0 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o AEP_P1-2_#695_1681_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
AEP_P1-2_#695_1681_SRT-A
CONTINGENCY 'AEP_P1-2_#695_1681_SRT-A'
 OPEN BRANCH FROM BUS 243206 TO BUS 270644 CKT 1   /*05DUMONT     765.0 - WILTON   ;   765.0
END
Contingency Type: Single
DC|AC: DC
Final Cycle Loading: 123.08 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1195.08 MVA
MW Contribution: 46.68 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
274847 GR RIDGE ;BU 80/20 0.73 MW 0.73 MW
274848 CAMPGROVE;RU 80/20 0.28 MW 0.28 MW
274849 CRESCENT ;1U 80/20 0.21 MW 0.21 MW
274850 MENDOTA H;RU 80/20 0.35 MW 0.35 MW
274851 PROVIDENC;RU 80/20 0.23 MW 0.23 MW
274853 TWINGROVE;U1 80/20 0.63 MW 0.63 MW
274854 TWINGROVE;U2 80/20 0.65 MW 0.65 MW
274855 GSG-6 ;RU 80/20 0.54 MW 0.54 MW
274856 ECOGROVE ;U1 80/20 0.46 MW 0.46 MW
274857 BIG SKY ;U1 80/20 0.35 MW 0.35 MW
274858 BIG SKY ;U2 80/20 0.35 MW 0.35 MW
274859 EASYR;U1 E 80/20 2.44 MW 2.44 MW
274860 EASYR;U2 E 80/20 2.44 MW 2.44 MW
274861 TOP CROP ;1U 80/20 0.45 MW 0.45 MW
274862 TOP CROP ;2U 80/20 0.86 MW 0.86 MW
274863 CAYUGA RI;1U 80/20 0.52 MW 0.52 MW
274864 CAYUGA RI;2U 80/20 0.52 MW 0.52 MW
274871 GR RIDGE ;2U 80/20 0.27 MW 0.27 MW
274872 LEE DEKAL;1U 80/20 0.99 MW 0.99 MW
274877 BISHOP HL;1U 80/20 0.43 MW 0.43 MW
274878 BISHOP HL;2U 80/20 0.43 MW 0.43 MW
274879 MINONK ;1U 80/20 0.99 MW 0.99 MW
274880 RADFORD R;1U 80/20 0.66 MW 0.66 MW
274887 PILOT HIL;1U 80/20 0.95 MW 0.95 MW
274888 KELLY CRK;1U 80/20 0.95 MW 0.95 MW
276156 O-029 C 80/20 0.25 MW 0.25 MW
276157 O-029 C 80/20 0.45 MW 0.45 MW
276158 O-029 C 80/20 0.45 MW 0.45 MW
276615 W2-048 GEN 80/20 0.89 MW 0.89 MW
276621 X2-022 GEN 80/20 2.54 MW 2.54 MW
290021 O50 E 80/20 3.96 MW 3.96 MW
290051 GSG-6; E 80/20 2.14 MW 2.14 MW
290108 LEEDK;1U E 80/20 4.91 MW 4.91 MW
290261 S-027 E 80/20 2.96 MW 2.96 MW
290265 S-028 E 80/20 2.94 MW 2.94 MW
293061 N-015 E 80/20 3.2 MW 3.2 MW
293644 O22 E1 80/20 2.82 MW 2.82 MW
293645 O22 E2 80/20 3.23 MW 3.23 MW
293715 O-029 E 80/20 1.97 MW 1.97 MW
293716 O-029 E 80/20 1.08 MW 1.08 MW
293717 O-029 E 80/20 0.99 MW 0.99 MW
293771 O-035 E 80/20 1.39 MW 1.39 MW
294392 P-010 E 80/20 4.06 MW 4.06 MW
294401 BSHIL;1U E 80/20 1.73 MW 1.73 MW
294410 BSHIL;2U E 80/20 1.73 MW 1.73 MW
294763 P-046 E 80/20 1.92 MW 1.92 MW
295109 WESTBROOK E 80/20 1.15 MW 1.15 MW
295111 SUBLETTE E 80/20 0.56 MW 0.56 MW
917502 Z2-087 E 80/20 3.33 MW 3.33 MW
918052 AA1-018 E OP 80/20 3.62 MW 3.62 MW
925581 AC1-033 C 80/20 0.46 MW 0.46 MW
925582 AC1-033 E 80/20 3.04 MW 3.04 MW
934721 AD1-100 C 80/20 3.82 MW 3.82 MW
934722 AD1-100 E 80/20 59.45 MW 59.45 MW
937001 AD2-134 C 80/20 0.83 MW 0.83 MW
937002 AD2-134 E 80/20 3.31 MW 3.31 MW
942111 AE2-223 C 80/20 1.2 MW 1.2 MW
942112 AE2-223 E 80/20 8.0 MW 8.0 MW
957331 AF2-027 C 80/20 2.05 MW 2.05 MW
957332 AF2-027 E 80/20 3.08 MW 3.08 MW
959351 AF2-226 C 80/20 1.96 MW 1.96 MW
959352 AF2-226 E 80/20 2.94 MW 2.94 MW
959611 AF2-252 C 80/20 1.45 MW 1.45 MW
959612 AF2-252 E 80/20 2.18 MW 2.18 MW
960281 AF2-319 C 80/20 1.96 MW 1.96 MW
960282 AF2-319 E 80/20 2.94 MW 2.94 MW
960611 AF2-352 C 80/20 1.45 MW 1.45 MW
960612 AF2-352 E 80/20 2.18 MW 2.18 MW
962012 AG1-044 E 80/20 0.04 MW 0.04 MW
966091 AG1-478 C 80/20 0.43 MW 0.43 MW
966092 AG1-478 E 80/20 0.65 MW 0.65 MW
966431 AG1-512 C 80/20 3.76 MW 3.76 MW
966432 AG1-512 E 80/20 5.63 MW 5.63 MW
966441 AG1-513 C 80/20 0.42 MW 0.42 MW
966442 AG1-513 E 80/20 0.63 MW 0.63 MW
274674 JOLIET 9 ;6U 80/20 13.64 MW 13.64 MW
274675 JOLIET 29;7U 80/20 36.25 MW 36.25 MW
274676 JOLIET 29;8U 80/20 36.24 MW 36.24 MW
274682 WAUKEGAN ;7U 80/20 15.27 MW 15.27 MW
274683 WAUKEGAN ;8U 80/20 16.46 MW 16.46 MW
274687 WILL CNTY;4U 80/20 32.59 MW 32.59 MW
274890 CAYUG;1U E 80/20 2.75 MW 2.75 MW
274891 CAYUG;2U E 80/20 2.75 MW 2.75 MW
925771 AC1-053 C 80/20 0.59 MW 0.59 MW
925772 AC1-053 E 80/20 3.95 MW 3.95 MW
938851 AE1-113 C 80/20 5.23 MW 5.23 MW
938852 AE1-113 E 80/20 18.55 MW 18.55 MW
939401 AE1-172 C 80/20 3.45 MW 3.45 MW
939402 AE1-172 E 80/20 16.15 MW 16.15 MW
942651 AE2-281 C 80/20 0.59 MW 0.59 MW
942652 AE2-281 E 80/20 3.64 MW 3.64 MW
270681 BRIGHTSTK; R 80/20 0.5 MW 0.5 MW
270839 OTTER CRK; R 80/20 0.54 MW 0.54 MW
274881 WALNUT RG;1U 80/20 0.95 MW 0.95 MW
275149 KELLYCK ;1E 80/20 3.79 MW 3.79 MW
276174 W4-005 E 80/20 3.77 MW 3.77 MW
276602 WESTBROOK C 80/20 0.17 MW 0.17 MW
276603 SUBLETTE C 80/20 0.08 MW 0.08 MW
276626 AG1-044 E 80/20 0.05 MW 0.05 MW
276627 AG1-044 BAT 80/20 0.01 MW 0.01 MW
276645 AC1-214 C1 80/20 0.19 MW 0.19 MW
276646 AC1-214 C2 80/20 0.19 MW 0.19 MW
276655 AB2-047 C1 80/20 0.31 MW 0.31 MW
276656 AB2-047 C2 80/20 0.31 MW 0.31 MW
276668 AB2-070 C 80/20 0.38 MW 0.38 MW
276675 AE2-062 E 80/20 0.11 MW 0.11 MW
293516 O-009 E 80/20 3.81 MW 3.81 MW
293519 PILOT HIL;1E 80/20 3.79 MW 3.79 MW
916212 CRESCENT ;1U 80/20 0.98 MW 0.98 MW
916221 Z1-073 E 80/20 1.51 MW 1.51 MW
924048 AB2-047 E1 80/20 2.07 MW 2.07 MW
924049 AB2-047 E2 80/20 2.1 MW 2.1 MW
924266 AB2-070 E 80/20 2.27 MW 2.27 MW
926821 AC1-168 C 80/20 0.74 MW 0.74 MW
926822 AC1-168 E 80/20 4.98 MW 4.98 MW
927208 AC1-214 E1 80/20 0.66 MW 0.66 MW
927209 AC1-214 E2 80/20 0.66 MW 0.66 MW
935141 AD1-148 C 80/20 0.8 MW 0.8 MW
936371 AD2-047 C 80/20 2.94 MW 2.94 MW
936372 AD2-047 E 80/20 14.37 MW 14.37 MW
938861 AE1-114 C 80/20 2.56 MW 2.56 MW
938862 AE1-114 E 80/20 8.72 MW 8.72 MW
939321 AE1-163 C 80/20 4.15 MW 4.15 MW
939322 AE1-163 E 80/20 25.5 MW 25.5 MW
941731 AE2-173 C 80/20 3.83 MW 3.83 MW
942421 AE2-255 C 80/20 1.98 MW 1.98 MW
942422 AE2-255 E 80/20 5.95 MW 5.95 MW
946321 AF1-296 C 80/20 2.29 MW 2.29 MW
946322 AF1-296 E 80/20 10.74 MW 10.74 MW
957371 AF2-031 C 80/20 0.64 MW 0.64 MW
957372 AF2-031 E 80/20 0.95 MW 0.95 MW
957751 AF2-069 C 80/20 0.14 MW 0.14 MW
957752 AF2-069 E 80/20 0.45 MW 0.45 MW
960261 AF2-317 C 80/20 0.34 MW 0.34 MW
961011 AF2-392 C 80/20 2.57 MW 2.57 MW
961012 AF2-392 E 80/20 11.97 MW 11.97 MW
961501 AF2-441 C 80/20 6.93 MW 6.93 MW
961502 AF2-441 E 80/20 10.4 MW 10.4 MW
963831 AG1-236 C 80/20 1.06 MW 1.06 MW
963832 AG1-236 E 80/20 7.11 MW 7.11 MW
965331 AG1-398 C 80/20 0.17 MW 0.17 MW
965791 AG1-447 C 80/20 46.68 MW 46.68 MW
990901 L-005 E 80/20 2.56 MW 2.56 MW
276170 Z1-108 E 80/20 2.04 MW 2.04 MW
920272 AA2-123 E 80/20 2.0 MW 2.0 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT4-5___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 115.29 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1119.5 MVA
MW Contribution: 46.68 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
274847 GR RIDGE ;BU 50/50 0.73 MW 0.73 MW
274871 GR RIDGE ;2U 50/50 0.27 MW 0.27 MW
274887 PILOT HIL;1U 50/50 0.95 MW 0.95 MW
274888 KELLY CRK;1U 50/50 0.95 MW 0.95 MW
293061 N-015 E 50/50 3.2 MW 3.2 MW
294392 P-010 E 50/50 4.06 MW 4.06 MW
918052 AA1-018 E OP 50/50 3.62 MW 3.62 MW
934721 AD1-100 C 50/50 3.82 MW 3.82 MW
934722 AD1-100 E 50/50 59.44 MW 59.44 MW
942111 AE2-223 C Adder 1.2 MW 1.02 MW
942112 AE2-223 E Adder 8.0 MW 6.8 MW
957331 AF2-027 C 50/50 2.05 MW 2.05 MW
957332 AF2-027 E 50/50 3.08 MW 3.08 MW
959351 AF2-226 C Adder 1.96 MW 1.67 MW
959352 AF2-226 E Adder 2.95 MW 2.5 MW
959611 AF2-252 C Adder 1.45 MW 1.23 MW
959612 AF2-252 E Adder 2.18 MW 1.85 MW
960281 AF2-319 C Adder 1.96 MW 1.67 MW
960282 AF2-319 E Adder 2.95 MW 2.5 MW
960611 AF2-352 C Adder 1.45 MW 1.23 MW
960612 AF2-352 E Adder 2.18 MW 1.85 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
966091 AG1-478 C 50/50 0.43 MW 0.43 MW
966092 AG1-478 E 50/50 0.65 MW 0.65 MW
966431 AG1-512 C 50/50 3.76 MW 3.76 MW
966432 AG1-512 E 50/50 5.63 MW 5.63 MW
966441 AG1-513 C 50/50 0.42 MW 0.42 MW
966442 AG1-513 E 50/50 0.63 MW 0.63 MW
274674 JOLIET 9 ;6U 50/50 13.64 MW 13.64 MW
274675 JOLIET 29;7U 50/50 36.25 MW 36.25 MW
274676 JOLIET 29;8U 50/50 36.24 MW 36.24 MW
274682 WAUKEGAN ;7U 50/50 15.27 MW 15.27 MW
274683 WAUKEGAN ;8U 50/50 16.47 MW 16.47 MW
274687 WILL CNTY;4U 50/50 32.59 MW 32.59 MW
938851 AE1-113 C Adder 5.23 MW 4.45 MW
938852 AE1-113 E Adder 18.56 MW 15.77 MW
939401 AE1-172 C Adder 3.45 MW 2.93 MW
939402 AE1-172 E Adder 16.15 MW 13.73 MW
942651 AE2-281 C 50/50 0.59 MW 0.59 MW
942652 AE2-281 E 50/50 3.64 MW 3.64 MW
270839 OTTER CRK; R 50/50 0.54 MW 0.54 MW
275149 KELLYCK ;1E 50/50 3.79 MW 3.79 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
276627 AG1-044 BAT Adder 0.01 MW 0.01 MW
276675 AE2-062 E 50/50 0.11 MW 0.11 MW
293519 PILOT HIL;1E 50/50 3.79 MW 3.79 MW
926821 AC1-168 C Adder 0.74 MW 0.63 MW
926822 AC1-168 E Adder 4.98 MW 4.23 MW
936371 AD2-047 C 50/50 2.94 MW 2.94 MW
936372 AD2-047 E 50/50 14.37 MW 14.37 MW
938861 AE1-114 C Adder 2.56 MW 2.17 MW
938862 AE1-114 E Adder 8.72 MW 7.41 MW
939321 AE1-163 C 50/50 4.15 MW 4.15 MW
939322 AE1-163 E 50/50 25.5 MW 25.5 MW
941731 AE2-173 C Adder 3.83 MW 3.26 MW
942421 AE2-255 C Adder 1.98 MW 1.69 MW
942422 AE2-255 E Adder 5.95 MW 5.06 MW
946321 AF1-296 C Adder 2.29 MW 1.95 MW
946322 AF1-296 E Adder 10.74 MW 9.13 MW
957371 AF2-031 C Adder 0.64 MW 0.54 MW
957372 AF2-031 E Adder 0.95 MW 0.81 MW
957751 AF2-069 C Adder 0.14 MW 0.12 MW
957752 AF2-069 E Adder 0.45 MW 0.38 MW
961011 AF2-392 C Adder 2.57 MW 2.19 MW
961012 AF2-392 E Adder 11.97 MW 10.18 MW
961501 AF2-441 C Adder 6.93 MW 5.89 MW
961502 AF2-441 E Adder 10.4 MW 8.84 MW
963831 AG1-236 C Adder 1.06 MW 0.9 MW
963832 AG1-236 E Adder 7.11 MW 6.04 MW
965791 AG1-447 C 50/50 46.67 MW 46.67 MW
276170 Z1-108 E Adder 2.4 MW 2.04 MW
920272 AA2-123 E Adder 2.35 MW 2.0 MW
954982 J974 External Queue 12.97 MW 12.97 MW
990052 J1200 External Queue 0.35 MW 0.35 MW
990512 J1326 G External Queue 4.44 MW 4.44 MW
990947 J1432 G External Queue 12.5 MW 12.5 MW
991302 J1755 External Queue 8.08 MW 8.08 MW

Details for AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT3-4___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: AEP/CE
Facility Description:
AF2-359 TP-05OLIVE 345.0 kV Ckt 1 line
960680 to 243229 ckt 1
Contingency Name:
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 115.29 %
Rating: 971.0 MVA
Rating Type: B
MVA to Mitigate: 1119.49 MVA
MW Contribution: 46.68 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
274847 GR RIDGE ;BU 50/50 0.73 MW 0.73 MW
274871 GR RIDGE ;2U 50/50 0.27 MW 0.27 MW
274887 PILOT HIL;1U 50/50 0.95 MW 0.95 MW
274888 KELLY CRK;1U 50/50 0.95 MW 0.95 MW
293061 N-015 E 50/50 3.2 MW 3.2 MW
294392 P-010 E 50/50 4.06 MW 4.06 MW
918052 AA1-018 E OP 50/50 3.62 MW 3.62 MW
934721 AD1-100 C 50/50 3.82 MW 3.82 MW
934722 AD1-100 E 50/50 59.44 MW 59.44 MW
942111 AE2-223 C Adder 1.2 MW 1.02 MW
942112 AE2-223 E Adder 8.0 MW 6.8 MW
957331 AF2-027 C 50/50 2.05 MW 2.05 MW
957332 AF2-027 E 50/50 3.08 MW 3.08 MW
959351 AF2-226 C Adder 1.96 MW 1.67 MW
959352 AF2-226 E Adder 2.95 MW 2.5 MW
959611 AF2-252 C Adder 1.45 MW 1.23 MW
959612 AF2-252 E Adder 2.18 MW 1.85 MW
960281 AF2-319 C Adder 1.96 MW 1.67 MW
960282 AF2-319 E Adder 2.95 MW 2.5 MW
960611 AF2-352 C Adder 1.45 MW 1.23 MW
960612 AF2-352 E Adder 2.18 MW 1.85 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
966091 AG1-478 C 50/50 0.43 MW 0.43 MW
966092 AG1-478 E 50/50 0.65 MW 0.65 MW
966431 AG1-512 C 50/50 3.76 MW 3.76 MW
966432 AG1-512 E 50/50 5.63 MW 5.63 MW
966441 AG1-513 C 50/50 0.42 MW 0.42 MW
966442 AG1-513 E 50/50 0.63 MW 0.63 MW
274674 JOLIET 9 ;6U 50/50 13.64 MW 13.64 MW
274675 JOLIET 29;7U 50/50 36.25 MW 36.25 MW
274676 JOLIET 29;8U 50/50 36.24 MW 36.24 MW
274682 WAUKEGAN ;7U 50/50 15.27 MW 15.27 MW
274683 WAUKEGAN ;8U 50/50 16.47 MW 16.47 MW
274687 WILL CNTY;4U 50/50 32.59 MW 32.59 MW
938851 AE1-113 C Adder 5.23 MW 4.45 MW
938852 AE1-113 E Adder 18.56 MW 15.77 MW
939401 AE1-172 C Adder 3.45 MW 2.93 MW
939402 AE1-172 E Adder 16.15 MW 13.73 MW
942651 AE2-281 C 50/50 0.59 MW 0.59 MW
942652 AE2-281 E 50/50 3.64 MW 3.64 MW
270839 OTTER CRK; R 50/50 0.54 MW 0.54 MW
275149 KELLYCK ;1E 50/50 3.79 MW 3.79 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
276627 AG1-044 BAT Adder 0.01 MW 0.01 MW
276675 AE2-062 E 50/50 0.11 MW 0.11 MW
293519 PILOT HIL;1E 50/50 3.79 MW 3.79 MW
926821 AC1-168 C Adder 0.74 MW 0.63 MW
926822 AC1-168 E Adder 4.98 MW 4.23 MW
936371 AD2-047 C 50/50 2.94 MW 2.94 MW
936372 AD2-047 E 50/50 14.37 MW 14.37 MW
938861 AE1-114 C Adder 2.56 MW 2.17 MW
938862 AE1-114 E Adder 8.72 MW 7.41 MW
939321 AE1-163 C 50/50 4.15 MW 4.15 MW
939322 AE1-163 E 50/50 25.5 MW 25.5 MW
941731 AE2-173 C Adder 3.83 MW 3.26 MW
942421 AE2-255 C Adder 1.98 MW 1.69 MW
942422 AE2-255 E Adder 5.95 MW 5.06 MW
946321 AF1-296 C Adder 2.29 MW 1.95 MW
946322 AF1-296 E Adder 10.74 MW 9.13 MW
957371 AF2-031 C Adder 0.64 MW 0.54 MW
957372 AF2-031 E Adder 0.95 MW 0.81 MW
957751 AF2-069 C Adder 0.14 MW 0.12 MW
957752 AF2-069 E Adder 0.45 MW 0.38 MW
961011 AF2-392 C Adder 2.57 MW 2.19 MW
961012 AF2-392 E Adder 11.97 MW 10.18 MW
961501 AF2-441 C Adder 6.93 MW 5.89 MW
961502 AF2-441 E Adder 10.4 MW 8.84 MW
963831 AG1-236 C Adder 1.06 MW 0.9 MW
963832 AG1-236 E Adder 7.11 MW 6.04 MW
965791 AG1-447 C 50/50 46.67 MW 46.67 MW
276170 Z1-108 E Adder 2.4 MW 2.04 MW
920272 AA2-123 E Adder 2.35 MW 2.0 MW
954982 J974 External Queue 12.97 MW 12.97 MW
990052 J1200 External Queue 0.35 MW 0.35 MW
990512 J1326 G External Queue 4.44 MW 4.44 MW
990947 J1432 G External Queue 12.5 MW 12.5 MW
991302 J1755 External Queue 8.08 MW 8.08 MW

Details for UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT4-5___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
Contingency Name:
COMED_P4_112-65-BT4-5___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT4-5___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270644 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275233 TO BUS 270927 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ; R 345.0
 TRIP BRANCH FROM BUS 275233 TO BUS 275333 CKT 1   /*WILTON   ;4M 345.0 - WILTON   ;4C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 112.39 %
Rating: 970.0 MVA
Rating Type: STE
MVA to Mitigate: 1090.2 MVA
MW Contribution: 8.32 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
274847 GR RIDGE ;BU 50/50 0.73 MW 0.73 MW
274871 GR RIDGE ;2U 50/50 0.27 MW 0.27 MW
274887 PILOT HIL;1U 50/50 0.95 MW 0.95 MW
274888 KELLY CRK;1U 50/50 0.95 MW 0.95 MW
293061 N-015 E 50/50 3.2 MW 3.2 MW
294392 P-010 E 50/50 4.06 MW 4.06 MW
918052 AA1-018 E OP 50/50 3.62 MW 3.62 MW
934721 AD1-100 C 50/50 3.82 MW 3.82 MW
934722 AD1-100 E 50/50 59.44 MW 59.44 MW
942111 AE2-223 C Adder 1.2 MW 1.02 MW
942112 AE2-223 E Adder 8.0 MW 6.8 MW
957331 AF2-027 C 50/50 2.05 MW 2.05 MW
957332 AF2-027 E 50/50 3.08 MW 3.08 MW
959351 AF2-226 C Adder 1.96 MW 1.67 MW
959352 AF2-226 E Adder 2.95 MW 2.5 MW
959611 AF2-252 C Adder 1.45 MW 1.23 MW
959612 AF2-252 E Adder 2.18 MW 1.85 MW
960281 AF2-319 C Adder 1.96 MW 1.67 MW
960282 AF2-319 E Adder 2.95 MW 2.5 MW
960611 AF2-352 C Adder 1.45 MW 1.23 MW
960612 AF2-352 E Adder 2.18 MW 1.85 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
966091 AG1-478 C 50/50 0.43 MW 0.43 MW
966092 AG1-478 E 50/50 0.65 MW 0.65 MW
966431 AG1-512 C 50/50 3.76 MW 3.76 MW
966432 AG1-512 E 50/50 5.63 MW 5.63 MW
966441 AG1-513 C 50/50 0.42 MW 0.42 MW
966442 AG1-513 E 50/50 0.63 MW 0.63 MW
274674 JOLIET 9 ;6U 50/50 13.64 MW 13.64 MW
274675 JOLIET 29;7U 50/50 36.25 MW 36.25 MW
274676 JOLIET 29;8U 50/50 36.24 MW 36.24 MW
274682 WAUKEGAN ;7U 50/50 15.27 MW 15.27 MW
274683 WAUKEGAN ;8U 50/50 16.47 MW 16.47 MW
274687 WILL CNTY;4U 50/50 32.59 MW 32.59 MW
938851 AE1-113 C Adder 5.23 MW 4.45 MW
938852 AE1-113 E Adder 18.56 MW 15.77 MW
939401 AE1-172 C Adder 3.45 MW 2.93 MW
939402 AE1-172 E Adder 16.15 MW 13.73 MW
942651 AE2-281 C 50/50 0.59 MW 0.59 MW
942652 AE2-281 E 50/50 3.64 MW 3.64 MW
270839 OTTER CRK; R 50/50 0.54 MW 0.54 MW
275149 KELLYCK ;1E 50/50 3.79 MW 3.79 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
276627 AG1-044 BAT Adder 0.01 MW 0.01 MW
276675 AE2-062 E 50/50 0.11 MW 0.11 MW
293519 PILOT HIL;1E 50/50 3.79 MW 3.79 MW
926821 AC1-168 C Adder 0.74 MW 0.63 MW
926822 AC1-168 E Adder 4.98 MW 4.23 MW
936371 AD2-047 C 50/50 2.94 MW 2.94 MW
936372 AD2-047 E 50/50 14.37 MW 14.37 MW
938861 AE1-114 C Adder 2.56 MW 2.17 MW
938862 AE1-114 E Adder 8.72 MW 7.41 MW
939321 AE1-163 C 50/50 4.15 MW 4.15 MW
939322 AE1-163 E 50/50 25.5 MW 25.5 MW
941731 AE2-173 C Adder 3.83 MW 3.26 MW
942421 AE2-255 C Adder 1.98 MW 1.69 MW
942422 AE2-255 E Adder 5.95 MW 5.06 MW
946321 AF1-296 C Adder 2.29 MW 1.95 MW
946322 AF1-296 E Adder 10.74 MW 9.13 MW
957371 AF2-031 C Adder 0.64 MW 0.54 MW
957372 AF2-031 E Adder 0.95 MW 0.81 MW
957751 AF2-069 C Adder 0.14 MW 0.12 MW
957752 AF2-069 E Adder 0.45 MW 0.38 MW
961011 AF2-392 C Adder 2.57 MW 2.19 MW
961012 AF2-392 E Adder 11.97 MW 10.18 MW
961501 AF2-441 C Adder 6.93 MW 5.89 MW
961502 AF2-441 E Adder 10.4 MW 8.84 MW
963831 AG1-236 C Adder 1.06 MW 0.9 MW
963832 AG1-236 E Adder 7.11 MW 6.04 MW
276170 Z1-108 E 50/50 2.04 MW 2.04 MW
920272 AA2-123 E Adder 2.35 MW 2.0 MW
965793 AG1-447 BT 50/50 8.32 MW 8.32 MW
954982 J974 External Queue 12.97 MW 12.97 MW
990052 J1200 External Queue 0.35 MW 0.35 MW
990512 J1326 G External Queue 4.44 MW 4.44 MW
990947 J1432 G External Queue 12.5 MW 12.5 MW
991302 J1755 External Queue 8.08 MW 8.08 MW

Details for UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line l/o COMED_P4_112-65-BT3-4___SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area: CE
Facility Description:
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line
274804 to 960680 ckt 1
Contingency Name:
COMED_P4_112-65-BT3-4___SRT-A
CONTINGENCY 'COMED_P4_112-65-BT3-4___SRT-A'
 REMOVE SHUNT 1 FROM BUS 270644                    /*WILTON   ;   765.0
 TRIP BRANCH FROM BUS 270644 TO BUS 243206 CKT 1   /*WILTON   ;   765.0 - 05DUMONT     765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270644 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;   765.0
 TRIP BRANCH FROM BUS 275232 TO BUS 270926 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ; B 345.0
 TRIP BRANCH FROM BUS 275232 TO BUS 275332 CKT 1   /*WILTON   ;3M 345.0 - WILTON   ;3C  33.0
END
Contingency Type: Breaker
DC|AC: AC
Final Cycle Loading: 112.39 %
Rating: 970.0 MVA
Rating Type: STE
MVA to Mitigate: 1090.18 MVA
MW Contribution: 8.32 MW
Impact of Topology Modeling:
Elimination
Bus # Bus Name Type Full MW Contribution GenDeliv MW Contribution
274847 GR RIDGE ;BU 50/50 0.73 MW 0.73 MW
274871 GR RIDGE ;2U 50/50 0.27 MW 0.27 MW
274887 PILOT HIL;1U 50/50 0.95 MW 0.95 MW
274888 KELLY CRK;1U 50/50 0.95 MW 0.95 MW
293061 N-015 E 50/50 3.2 MW 3.2 MW
294392 P-010 E 50/50 4.06 MW 4.06 MW
918052 AA1-018 E OP 50/50 3.62 MW 3.62 MW
934721 AD1-100 C 50/50 3.82 MW 3.82 MW
934722 AD1-100 E 50/50 59.44 MW 59.44 MW
942111 AE2-223 C Adder 1.2 MW 1.02 MW
942112 AE2-223 E Adder 8.0 MW 6.8 MW
957331 AF2-027 C 50/50 2.05 MW 2.05 MW
957332 AF2-027 E 50/50 3.08 MW 3.08 MW
959351 AF2-226 C Adder 1.96 MW 1.67 MW
959352 AF2-226 E Adder 2.95 MW 2.5 MW
959611 AF2-252 C Adder 1.45 MW 1.23 MW
959612 AF2-252 E Adder 2.18 MW 1.85 MW
960281 AF2-319 C Adder 1.96 MW 1.67 MW
960282 AF2-319 E Adder 2.95 MW 2.5 MW
960611 AF2-352 C Adder 1.45 MW 1.23 MW
960612 AF2-352 E Adder 2.18 MW 1.85 MW
962012 AG1-044 E Adder 0.04 MW 0.04 MW
966091 AG1-478 C 50/50 0.43 MW 0.43 MW
966092 AG1-478 E 50/50 0.65 MW 0.65 MW
966431 AG1-512 C 50/50 3.76 MW 3.76 MW
966432 AG1-512 E 50/50 5.63 MW 5.63 MW
966441 AG1-513 C 50/50 0.42 MW 0.42 MW
966442 AG1-513 E 50/50 0.63 MW 0.63 MW
274674 JOLIET 9 ;6U 50/50 13.64 MW 13.64 MW
274675 JOLIET 29;7U 50/50 36.25 MW 36.25 MW
274676 JOLIET 29;8U 50/50 36.24 MW 36.24 MW
274682 WAUKEGAN ;7U 50/50 15.27 MW 15.27 MW
274683 WAUKEGAN ;8U 50/50 16.47 MW 16.47 MW
274687 WILL CNTY;4U 50/50 32.59 MW 32.59 MW
938851 AE1-113 C Adder 5.23 MW 4.45 MW
938852 AE1-113 E Adder 18.56 MW 15.77 MW
939401 AE1-172 C Adder 3.45 MW 2.93 MW
939402 AE1-172 E Adder 16.15 MW 13.73 MW
942651 AE2-281 C 50/50 0.59 MW 0.59 MW
942652 AE2-281 E 50/50 3.64 MW 3.64 MW
270839 OTTER CRK; R 50/50 0.54 MW 0.54 MW
275149 KELLYCK ;1E 50/50 3.79 MW 3.79 MW
276626 AG1-044 E Adder 0.05 MW 0.04 MW
276627 AG1-044 BAT Adder 0.01 MW 0.01 MW
276675 AE2-062 E 50/50 0.11 MW 0.11 MW
293519 PILOT HIL;1E 50/50 3.79 MW 3.79 MW
926821 AC1-168 C Adder 0.74 MW 0.63 MW
926822 AC1-168 E Adder 4.98 MW 4.23 MW
936371 AD2-047 C 50/50 2.94 MW 2.94 MW
936372 AD2-047 E 50/50 14.37 MW 14.37 MW
938861 AE1-114 C Adder 2.56 MW 2.17 MW
938862 AE1-114 E Adder 8.72 MW 7.41 MW
939321 AE1-163 C 50/50 4.15 MW 4.15 MW
939322 AE1-163 E 50/50 25.5 MW 25.5 MW
941731 AE2-173 C Adder 3.83 MW 3.26 MW
942421 AE2-255 C Adder 1.98 MW 1.69 MW
942422 AE2-255 E Adder 5.95 MW 5.06 MW
946321 AF1-296 C Adder 2.29 MW 1.95 MW
946322 AF1-296 E Adder 10.74 MW 9.13 MW
957371 AF2-031 C Adder 0.64 MW 0.54 MW
957372 AF2-031 E Adder 0.95 MW 0.81 MW
957751 AF2-069 C Adder 0.14 MW 0.12 MW
957752 AF2-069 E Adder 0.45 MW 0.38 MW
961011 AF2-392 C Adder 2.57 MW 2.19 MW
961012 AF2-392 E Adder 11.97 MW 10.18 MW
961501 AF2-441 C Adder 6.93 MW 5.89 MW
961502 AF2-441 E Adder 10.4 MW 8.84 MW
963831 AG1-236 C Adder 1.06 MW 0.9 MW
963832 AG1-236 E Adder 7.11 MW 6.04 MW
276170 Z1-108 E 50/50 2.04 MW 2.04 MW
920272 AA2-123 E Adder 2.35 MW 2.0 MW
965793 AG1-447 BT 50/50 8.32 MW 8.32 MW
954982 J974 External Queue 12.97 MW 12.97 MW
990052 J1200 External Queue 0.35 MW 0.35 MW
990512 J1326 G External Queue 4.44 MW 4.44 MW
990947 J1432 G External Queue 12.5 MW 12.5 MW
991302 J1755 External Queue 8.08 MW 8.08 MW

Light Load Potential Congestion due to Local Energy Deliverability

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

Short Circuit Analysis

The Phase III Short circuit analysis was conducted for the following two study scenarios:

 

  • Scenario 1 - TC1 Project Impacts;
  • Scenario 2 - TC1 Topology-Changing Upgrade Impacts;

 

The starting TC1 Phase III short circuit case is an updated Phase II case that accounted for the DPII outcomes (project changes & withdrawals) and other pre-TC1 changes. The starting Phase III case was utilized for the Scenario 1 studies to determine the impact of TC1 projects without modeling any topology-changing upgrades required for TC1. To conduct the Scenario 2 studies, the required topology-changing upgrades from the latest Load Flow & Stability studies were incorporated into the Scenario 1 case and utilized for the Scenario 2 studies to determine the impact of the topology-changing upgrades on the short circuit results from Scenario 1. The result is detailed in the following table:

Short Circuit Analysis

 

 

 

 

 

 

 

Bus Name

Breaker

Interrupting Capability (Amps)

Duty Percent TC1 Phase 3 - Scenario 2 Topology Upgrades (%)

Duty Percent TC1 Phase 3 - Scenario 2 No Topology Upgrades (%)

Duty Percent Difference (%)

Reinforcement

Projected In Service Date (ISD)

GOODING 345 kV

270769

57267

100.77%

98.71%

2.06%

s3011

12/31/2028

 

 

Stability Analysis

Analysis Complete - No Issues

Executive Summary

 

New Service Requests (AG1-436, and AG1-447) in PJM Transition Cycle 1, Cluster 58 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 58 projects.

 

This analysis is effectively a screening study to determine whether the addition of the cluster 58 projects will meet the dynamics requirements of the NERC, AEP and PJM reliability standards.

 

The load flow scenario for the analysis was based on the RTEP 2027 summer peak load case, modified to include applicable projects. Cluster 58 projects have been dispatched online at maximum power output, with 1.0 voltage at the terminal bus.

 

Cluster 58 projects were tested for compliance with NERC, PJM, Transmission Owner and other applicable criteria. Steady-state condition and 56 contingencies were studied, each with a 20 second simulation time period. Studied faults included:

       a)       Steady-state operation (20 second run),

       a)       Three-phase faults with normal clearing time; (and with unsuccessful high-speed reclosing),

       b)       Single-phase bus faults with normal clearing time,

       c)       Single-phase faults with stuck breaker,

       d)       Three-phase faults with loss of multiple-circuit tower line; (and with unsuccessful high-speed reclosing).

 

There are no delayed (Zone 2) clearing faults due to dual primary relays being employed in the AEP 345 kV transmission system.

 

For all simulations, the queue project under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance.

 

For all of the fault contingencies tested on the 2027 peak load case:

       a)       Cluster 58 projects were able to ride through the faults (except for faults where protective action trips a generator(s)),

       b)       The system with Cluster 58 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and for local modes.

       c)       Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus).

       d)       No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

AG1-447 and AG1-436 meet the 0.95 leading and lagging PF requirement.

 

AG1-436 GEN exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. This issue was mitigated by increasing Kc value in REPCA1 dynamic model from 0 to 0.1. This change has been confirmed by the developer and included in the latest data submission.

 

AG1-447 GEN exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. ETERM of AG1-447 GEN went outside the range of 0.95 pu ~1.05 pu in post fault for several contingencies. These issues were mitigated by changing VCFlag from 1 to 0, increasing Kc from 0 to 0.08, and Ki from 0.5 to 3.5 in the REPCA1 model. These changes have been confirmed by the developer in correspondence.

 

The IPCMD and IQCMD states in the REGCA1 model of AG1-447 GEN, and AG1-436 GEN showed erratic behavior for some contingencies in which these generators have been disconnected as part of the contingency event. Since the machine is disconnected and no active or reactive power is injected into the system, this behavior is likely fictitious and a limitation of the software. This does not cause instability in the system.

 

No mitigations were found to be required.

 

Table 1: TC1 Cluster 58 Projects

Cluster

Project

Fuel Type

Transmission Owner

MFO

MWE

MWC

Point of Interconnection

58

AG1-436

Solar

AEP

125

125

75

Olive-University Park 345 kV

AG1-447

Battery

AEP

55

55

55

Olive-University Park 345 kV

 

 

Reactive Power Analysis

The reactive power capability of AG1-447 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project ID Project Name Status
AA2-116 Cook-East Elkhart 345kV In Service
AC2-154 Davis Creek 138kV Engineering & Procurement
AD2-020 Valley 138 kV Engineering & Procurement
AD2-047 Davis Creek 138 kV Suspended
AD2-060 Davis Creek 138kV Engineering & Procurement
AD2-079 Capitol Ave 34.5kV In Service
AE1-146 Ebersole #2-Fostoria Central 138 kV Under Construction
AE1-170 Kenzie Creek-Colby 138 kV Suspended
AE2-045 Olive-Reynolds 345 kV Engineering & Procurement
AE2-181 Snyder 69kV Under Construction
AE2-323 Twin Branch-Guardian 138 kV Under Construction
AE2-325 Valley 138 kV Active
AF1-064 Weston 69 kV Under Construction
AF1-084 Hartford-Almena 69 kV Engineering & Procurement
AF1-158 Edison-Gravel Pit 138 kV In Service
AF1-161 Valley 138 kV Active
AF1-176 Corey 138 kV Active
AF1-207 Reynolds-Olive #1 345 kV Engineering & Procurement
AF1-215 Olive-Reynolds 345 kV In Service
AF1-229 Galion-South Berwick 345 kV Engineering & Procurement
AF2-031 Calumet Engineering & Procurement
AF2-078 Reynolds-Olive #1 345 kV Engineering & Procurement
AF2-083 Kenzie Creek-Stone Lake 69 kV Under Construction
AF2-095 Davis Creek 138 kV Active
AF2-132 Reynolds-Olive #1 345 kV Under Construction
AF2-133 Reynolds-Olive #2 345 kV Under Construction
AF2-134 Olive-Reynolds #2 345 kV In Service
AF2-205 Olive-Reynolds #2 345 kV Engineering & Procurement
AF2-350 Kensington 138 kV Active
AF2-359 Olive-University Park 345 kV Engineering & Procurement
AF2-375 Ebersole-Fostoria 138 kV Engineering & Procurement
AF2-389 Kenzie Creek-Stone Lake 69 kV Withdrawn
AF2-396 Stinger 138 kV Active
AF2-441 Burnham 138kV Active
AG1-109 Valley 138 kV Active
AG1-302 Olive-Reynolds #1 345 kV Under Construction
AG1-349 Olive-Reynolds #2 345 kV Engineering & Procurement
AG1-436 Olive-University Park 345 kV Active
AG1-512 University Park North 345 kV Withdrawn
X1-042 Watervliet In Service
X3-005 Wildwood 12kV In Service
Y3-023 Country Side 12kV In Service
Z2-116 Twin Branch 12.47kV In Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO) Identified Impacts
AG1-447 System Reinforcements:
TO Trans Owner ID Title Category Allocated Cost ($USD)
METC METC_TC1_16078 Perform sag mitigation on Allen Junction - Morocco 345kV line. New ratings will be 1861/2124 MVA. Informational $0
ITCT ITCT_TC1_13866 MTEP24#25223 - Lulu Sub. Construct the Lulu switching station. Cut in the Lemoyne-Maple and Milan-Monroe-Morocco lines into the new station (Projected ISD 6/11/2027) Informational $0
ITCT ITCT_TC1_15164 Reconductor ITCT section of Lallendorf-Monroe line. Post upgrade ratings will be 1677/2124. Informational $0
Grand Total: $0

System Reinforcement
Type
Load Flow
TO
METC
RTEP ID / TO ID
(Pending) / METC_TC1_16078
Title
Perform sag mitigation on Allen Junction - Morocco 345kV line. New ratings will be 1861/2124 MVA.
Description
Perform sag mitigation on Allen Junction - Morocco 345kV line. New ratings will be 1861/2124 MVA.
Total Cost ($USD)
$625,000
Allocated Cost ($USD)
$0
Time Estimate
18 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG1-447 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG1-447 could receive cost allocation. Although AG1-447 may not presently have cost responsibility for this upgrade, AG1-447 is a potential Aggregate Pool Contributor.

Facility Contingency
02ALLEN-18MOROCCO 345.0 kV Ckt 1 line (Any)

System Reinforcement
Type
Load Flow
TO
ITCT
RTEP ID / TO ID
(Pending) / ITCT_TC1_13866
Title
MTEP24#25223 - Lulu Sub. Construct the Lulu switching station. Cut in the Lemoyne-Maple and Milan-Monroe-Morocco lines into the new station (Projected ISD 6/11/2027)
Description
Construct the Lulu switching station. Cut in the Lemoyne-Maple and Milan-Monroe-Morocco lines into the new station. This project is a DPP 2020 Network Upgrade associated with the J1516, J1525, J1526, J1527, J1550, J1553, J1557, J1571, J1586, J1587, J1603, J1614, J1635, J1658, J1659, J1663, and J1664 projects. Projected In-Service 6/1/2027
Total Cost ($USD)
$29,916,928
Allocated Cost ($USD)
$0
Time Estimate
TBD

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG1-447 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG1-447 could receive cost allocation. Although AG1-447 may not presently have cost responsibility for this upgrade, AG1-447 is a potential Aggregate Pool Contributor.

Facility Contingency
02ALLEN-18MOROCCO 345.0 kV Ckt 1 line (Any)
02LEMOYN-J1062 TAP 345.0 kV Ckt 1 line (Any)
02LALLENDORF-19MON12 345.0 kV Ckt 1 line (Any)
02LEMOYN-J1062 POI 345.0 kV Ckt 1 line (Any)

System Reinforcement
Type
Load Flow
TO
ITCT
RTEP ID / TO ID
(Pending) / ITCT_TC1_15164
Title
Reconductor ITCT section of Lallendorf-Monroe line. Post upgrade ratings will be 1677/2124.
Description
Reconductor ITCT section of Lallendorf-Monroe line. Post upgrade ratings will be 1677/2124.
Total Cost ($USD)
$43,500,000
Allocated Cost ($USD)
$0
Time Estimate
36 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG1-447 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG1-447 could receive cost allocation. Although AG1-447 may not presently have cost responsibility for this upgrade, AG1-447 is a potential Aggregate Pool Contributor.

Facility Contingency
02LALLENDORF-19MON12 345.0 kV Ckt 1 line (Any)
02LALLENDORF-J2486 POI 345.0 kV Ckt 1 line (Any)

New York Independent System Operator (NYISO) No Impact
Tennessee Valley Authority (TVA) No Impact
Louisville Gas & Electric (LG&E) No Impact
Duke Energy Carolinas (DUKE) No Impact
Duke Energy Progress – East (CPLE) No Impact
Duke Energy Progress – West (CPLW) No Impact

Affected System - Non-PJM Identified Violations

In accordance with PJM Tariff Part VII, Subpart D, section 312.A.1.b and as outlined in PJM Manual 14H, Section 13, in Phase III of the Cycle, PJM coordinates with the Affected System Operators to conduct any studies required to determine the impact of the New Service Request on any Affected System and will include the Affected System Study results in Phase III System Impact Study, if available from the Affected System Operator.

If your project required an Affected System Study, the results are shown below from the Affected System Operator.

For more details, please refer to your Affected System Study report by the Affected System Operator. If the Affected System Operator identified the need for a system reinforcement on their system due to their planning criteria, Project Developer must follow the Affected System Operator Tariff for construction of the network upgrade. PJM will list any required network upgrades identified by the Affected System Operator in the PJM Project Developer’s GIA under Schedule F.

Affected System network upgrade costs are included in the Adverse Study Impact calculation for DP3. See the Adverse Test Eligibility section of this Phase III SIS report.

Midcontinent Independent System Operator, Inc. (MISO) Identified Impacts
Note: This reflects the Affected System studies results provided by the Affected System Operator. These results may be subject to adjustments based on the outcome of any studies in the remaining phases of the Affected System Operator's Generator Interconnection Process.
Impacted Facility Transmission Owner Reinforcement Cost Cost Allocated to AG1-447 Scenarios
  • Wvrich 69.0 - Rochester TP 69.0 CKT 1
DEI DEI: Rebuild 1 mile of Wvrich - Rochester TP 69 kV
DEI: Rebuild 1 mile of 69kV with 477ACSR/VR2 @
100/120C the ratings assume that NIPSCO terminal
upgrades would not limit our T-Line rating. $1.5M
NIPSCO: Rebuild line, NIPSCO owns 0.037 miles of
0.9 mile line. NIPSCO portion included in Argos to
Rochester tap mitigation/cost.
$1,500,000 $21,130
  • NIPSCO LPC
  • Wvrich 69.0 - Rochester TP 69.0 CKT 1
NIPS NIPSCO: Rebuild line (.3miles)Wvrich - Rochester TP 69 kV
DEI: Rebuild 1 mile of 69kV with 477ACSR/VR2 @
100/120C the ratings assume that NIPSCO terminal
upgrades would not limit our T-Line rating. $1.5M
NIPSCO: Rebuild line, NIPSCO owns 0.037 miles of
0.9 mile line. NIPSCO portion included in Argos to
Rochester tap mitigation/cost.
$0 $0
  • NIPSCO LPC
  • Argos 69.0 - Plymouth 69.0 CKT 1
NIPS Rebuild Argos - Plymouth 69 kV line
Rebuild line, approx 10 miles
$12,654,948 $173,003
  • NIPSCO LPC
  • Argos 69.0 - Rochester TP 69.0 CKT 1
NIPS Rebuild Argos - Rochester TP 69 kV
Rebuild line, approx 3.2 miles
$4,049,583 $57,045
  • NIPSCO LPC
  • CAP BANK 230.0 - Gallagher 230.0 CKT 0
DEI Install 144 MVAR cap bank at Gallagher sub.
Install 144 MVAR cap bank at Gallagher sub.
$3,000,000 $16,713
  • MISO Voltage
  • CAP BANK 138.0 - Shoals 138.0 CKT 0
DEI Install 28.8 MVAR cap bank at Shoals sub
Install 28.8 MVAR cap bank at Shoals sub
$3,000,000 $12,658
  • MISO Voltage
  • CAP BANK 138.0 - Avon East 138.0 CKT 0
DEI Install 28.8 MVAR cap bank at Avon East sub
Install 28.8 MVAR cap bank at Avon East sub
$3,000,000 $11,321
  • MISO Voltage
New York Independent System Operator (NYISO) Not required
Tennessee Valley Authority (TVA) Not required
Louisville Gas & Electric (LG&E) Not required
Duke Energy Carolinas (DUKE) Not required
Duke Energy Progress – East (CPLE) Not required
Duke Energy Progress – West (CPLW) Not required

System Reinforcements

Based on the Phase III analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AG1-447 System Reinforcements:
TO RTEP ID Title Category Allocated Cost ($USD) Facilities Study
ComEd b3811.1 Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus. Contingent $0 N/A
ComEd s3011 Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration. Contingent $0 N/A
ComEd b3775.1 Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line Contingent $0 N/A
AEP n9243.0 Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles. Contingent $0 N/A
ComEd n9195.0 Install a new 345 kV circuit breaker at Station 12 Dresden. Contingent $0 N/A
ComEd b3775.4 Rebuild 345 kV double circuit extending from Crete to E. Frankfort. Contingent $0 N/A
Grand Total: $0

PJM evaluated the impact of topology changing reinforcements to mitigate the impacts driven by New Service Requests. PJM determined which reinforcements were eliminated as a result of modeling the topology changing reinforcements. PJM then grouped the topology changing and eliminated reinforcements by region and computed a discount factor to apply to reinforcements to reduce the cost of all these reinforcements down to the cost of contstructing only the topology changing reinforcements. For additional details, please click the icon below

Regional Topology Upgrade Conversion

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n9322.0
Type
Load Flow
TO
ATSI
RTEP ID / TO ID
n9322.0 / TE-AG1-S-0012a
Title
Replace Four (4) disconnect switches, four (4) breaker leads, and one (1) meter, and reconductor two (2) transmission line drops on the Morocco 345 kV line terminal at Allen Junction.
Description
Replace (4) disconnect switches at Allen Junction Replace (4) breaker leads at Allen Junction Reconductor (2) TL Drops at Allen Junction Replace (1) meter at Allen Junction New FE Ratings 1868 / 2249 / 2586 MVA SN/SE/SLD
Total Cost ($USD)
$1,408,997
Discounted Total Cost ($USD)
$1,408,997
Allocated Cost ($USD)
$0
Time Estimate
38 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG1-447 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG1-447 could receive cost allocation. Although AG1-447 may not presently have cost responsibility for this upgrade, AG1-447 is a potential Aggregate Pool Contributor.

Facility Contingency
02ALLEN-18MOROCCO 345.0 kV Ckt 1 line (Any)

System Reinforcement: n9228.0
Type
Load Flow
TO
ATSI
RTEP ID / TO ID
n9228.0 / TC1-ATSI-002.b
Title
Rebuild 6.6 miles of the Lallendorf-Monroe 345 kV line and install OPGW. Replace line drops and wave traps at Lallendorf.
Description
Rebuild approximately 6.6 miles of the Lallendorf-Monroe 345 kV line from Lallendorf to the state line. Transfer and reuse approximately 0.9 miles of existing conductor on the Fostoria Central – Lallendorf 345 kV line to maintain double circuit with Lallendorf – Monroe line. Transfer and reuse approximately 5.7 miles of existing conductor on the Lemoyne – Majestic 345 kV line to maintain double circuit with Lallendorf – Monroe line. At Lallendorf substation, Replace line drops and (2) wave traps on the Monroe terminal.
Total Cost ($USD)
$38,362,639
Discounted Total Cost ($USD)
$38,362,639
Allocated Cost ($USD)
$0
Time Estimate
29 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG1-447 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG1-447 could receive cost allocation. Although AG1-447 may not presently have cost responsibility for this upgrade, AG1-447 is a potential Aggregate Pool Contributor.

Facility Contingency
02LALLENDORF-19MON12 345.0 kV Ckt 1 line (Any)

System Reinforcement: n4056.1
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n4056.1 / AEPI0048a
Title
Replace the (1) 3000A 765kV CB at Dumont station
Description
Replace the 3000A 765kV CB A2 at Dumont station Cost Estimate updated to $3,346,389 from Facility Study
Total Cost ($USD)
$3,346,389
Discounted Total Cost ($USD)
$3,346,389
Allocated Cost ($USD)
$0
Time Estimate
18 to 24 Months

Not Contingent

Note: AG1-447 contributes to the loading of an overloaded facility that is being mitigated by a network upgrade that was securitized by a prior Queue/Cycle. AG1-447 is not contingent on this network upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Facility Contingency
05DUMONT-05SORENS 765.0 kV Ckt 1 line (Any)

System Reinforcement: n9243.0
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n9243.0 / AEPSERG13
Title
Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles.
Description
At the Jefferson Station: • Expand the northeast corner of the station • Remove Circuit breaker C1 • Install one (1) new 765/345 kV transformer and associated equipment • Install one (1) new 765 kV circuit breaker with associated control relaying and breaker disconnect switches • Install one (1) new 345 kV circuit breaker with associated control relaying and breaker disconnect switches • Install a new station service center At the Clifty Creek Station: • Extend 345 kV bus 1 and 2 to make room for a new breaker string • Move a section of the 138 kV bus underground to make room for the new breaker string • Relocate circuit breaker S to the new string • Install two (2) new 345 kV circuit breakers on the new string •Remove the existing Jefferson – Clifty Creek 345 kV line •Construct a new Jefferson – Clifty Creek 345 kV double circuit line •Evaluate line settings for all appropriate lines •Install direct fiber relaying between the Jefferson and Clifty Creek station •Associated conductors (buswork, ground grid, jumpers), telecom terminal equipment, insulators, arresters, foundations, and structures
Total Cost ($USD)
$200,238,000
Discounted Total Cost ($USD)
$200,238,000
Allocated Cost ($USD)
$0
Time Estimate
55 Months

Potential Aggregate ContributorTopology Changing

Note 1: Based on PJM cost allocation criteria, AG1-447 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG1-447 could receive cost allocation. Although AG1-447 may not presently have cost responsibility for this upgrade, AG1-447 is a potential Aggregate Pool Contributor.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
05JEFRSO-06CLIFTY 345.0 kV Ckt Z1 line (Any)
05JEFRSO-05JEFRSO 345.0/765.0 kV Ckt 2 transformer (Any)
System Reinforcement: n9243.0
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n9243.0 / AEPSERG13
Title
Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles.
Description
At the Jefferson Station: • Expand the northeast corner of the station • Remove Circuit breaker C1 • Install one (1) new 765/345 kV transformer and associated equipment • Install one (1) new 765 kV circuit breaker with associated control relaying and breaker disconnect switches • Install one (1) new 345 kV circuit breaker with associated control relaying and breaker disconnect switches • Install a new station service center At the Clifty Creek Station: • Extend 345 kV bus 1 and 2 to make room for a new breaker string • Move a section of the 138 kV bus underground to make room for the new breaker string • Relocate circuit breaker S to the new string • Install two (2) new 345 kV circuit breakers on the new string •Remove the existing Jefferson – Clifty Creek 345 kV line •Construct a new Jefferson – Clifty Creek 345 kV double circuit line •Evaluate line settings for all appropriate lines •Install direct fiber relaying between the Jefferson and Clifty Creek station •Associated conductors (buswork, ground grid, jumpers), telecom terminal equipment, insulators, arresters, foundations, and structures
Total Cost ($USD)
$200,238,000
Allocated Cost ($USD)
$0
Time Estimate
55 Months
Cost Alloc Type
Contingent

System Reinforcement: n3985
Type
Load Flow
TO
AEP
RTEP ID / TO ID
n3985 / AEPO0036a
Title
Upgrade three Marysville Wavetraps ( 3000A)
Description
Replace 3 Marysville 765 kV wave traps. Costs updated to $705,368 from Facility Study
Total Cost ($USD)
$705,368
Discounted Total Cost ($USD)
$705,368
Allocated Cost ($USD)
$0
Time Estimate
18 to 24 Months

Not Contingent

Note: AG1-447 contributes to the loading of an overloaded facility that is being mitigated by a network upgrade that was securitized by a prior Queue/Cycle. AG1-447 is not contingent on this network upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Facility Contingency
05MARYSV-AF2-137 TAP 765.0 kV Ckt 1 line (Any)
05MARYSV-05SORENS 765.0 kV Ckt 1 line (Any)
05MARYSV-AF2-137 TP 765.0 kV Ckt 1 line (Any)

System Reinforcement: b3775.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.1
Title
Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line
Description
Outside of the Green Acres substation, swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line to the University Park N-Olive 345 kV line to create a University Park N-Green Acres-Olive and St. John-Olive 345 kV lines.
Cost Information
Time Estimate
Dec 01 2026

ContingentTopology Changing

Note 1: Although AG1-447 may not presently have cost responsibility for this upgrade, AG1-447 may need this upgrade in-service to be deliverable to the PJM system. If AG1-447 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

Facility Contingency
05OLIVE-GREENACRE; T 345.0 kV Ckt 1 line (Any)
17GREEN_ACRE-GREENACRE; T 345.0 kV Ckt 1 line (Any)
17GREEN_ACRE-ST JOHN ; T 345.0 kV Ckt 1 line (Any)
17STJOHN-ST JOHN ; T 345.0 kV Ckt 1 line (Any)
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
05OLIVE-05NEW CARLI1 138.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
05OLIVE-AF2-359 TP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (Any)
05MADDOX-AG1-410 TP 345.0 kV Ckt 1 line (Any)
System Reinforcement: b3775.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.1
Title
Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line
Description
Outside of the Green Acres substation, swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line to the University Park N-Olive 345 kV line to create a University Park N-Green Acres-Olive and St. John-Olive 345 kV lines.
Cost Information
Time Estimate
Dec 01 2026
Cost Alloc Type
Contingent

System Reinforcement: b3775.10
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b3775.10
Title
Perform sag study mitigation work on Olive – University Park
Description
Perform a sag study on the Olive – University Park 345kV line to increase the operating temperature to 225 F. Remediation work includes two tower replacements on the line.
Cost Information
Time Estimate
Dec 01 2026

Not Contingent

Note: AG1-447 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG1-447 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Facility Contingency
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (Any)

System Reinforcement: s2509
Type
Load Flow
TO
NextEra
RTEP ID / TO ID
s2509 / (Pending)
Title
Rebuild the L97008: Univ. Park S/S-Olive S/S 345 kV
Description
Rebuild the (L97008: Univ. Park S/S-Olive S/S 345 kV) of the ~20 mile double-circuit line withmonopoles and new conductor utilizing existing ROW ( Univ. Park S/S-Olive S/S 345 kV) .
Cost Information
Time Estimate
Dec 31 2023

Not Contingent

Note: AG1-447 contributes to the loading of an overloaded facility that is being mitigated by a planned supplemental project. AG1-447 is not contingent on this supplemental project as it is already in-service.

Facility Contingency
05OLIVE-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TAP 345.0 kV Ckt 1 line (Any)
UNIV PK N;RP-AF2-359 TP 345.0 kV Ckt 1 line (Any)

System Reinforcement: b3775.4
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3775.4 / CE_B3775.4
Title
Rebuild 345 kV double circuit extending from Crete to E. Frankfort.
Description
Part of b3775 baseline. Rebuild 12.7 miles of 345 kV double circuit extending from Crete to E. Frankfort with twin bundled 1277 ACAR conductor.
Cost Information
Time Estimate
Dec 01 2026

Contingent

Note: Although AG1-447 may not presently have cost responsibility for this upgrade, AG1-447 may need this upgrade in-service to be deliverable to the PJM system. If AG1-447 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Facility Contingency
(Any) 765-L11215__-S_SRT-A
E FRANKFO; R-UNIV PK N;RP 345.0 kV Ckt 1 line AEP_P1-2_#695_1681_SRT-A
E FRANKFO; R-UNIV PK N;RP 345.0 kV Ckt 1 line 765-L11215__-S_SRT-A

System Reinforcement: b3811.1

AG1-447 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: b3811.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
b3811.1 / CE_PJM B3811_L11323
Title
Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus.
Description
Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: s3011

AG1-447 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: s3011
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
s3011 / CE_S3011
Title
Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration.
Description
Replace 345 kV open air straight bus with GIS in a breaker and half configuration (34 Circuit Breakers) at Goodings Grove with 80kA capability.
Cost Information
Cost Alloc Type
Contingent

System Reinforcement: n9195.0

AG1-447 did not load into this reinforcement directly however this project contributed to an topology or eliminated upgrade and therefore this project is responsible for relevant regional upgrades.

System Reinforcement: n9195.0
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n9195.0 / CE_NUN_STA12_345 NEW CB
Title
Install a new 345 kV circuit breaker at Station 12 Dresden.
Description
• Upgrade the existing substation STA 12 Dresden by adding 345kV BT 14-15 circuit breaker and associated disconnect switches. • Upgrade relay & protection at 345kV substation STA 12 Dresden to support installation of 345kV BT 14-15
Total Cost ($USD)
$3,357,627
Allocated Cost ($USD)
$0
Time Estimate
45 Months
Cost Alloc Type
Contingent

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AG1-447


AG1-447 Contributions into Topology or Eliminated Reinforcements:
Type TO RTEP ID / TO ID Title Topo or Elim MW Impact Percent Allocation Category Allocated Cost ($USD)
Load Flow ComEd b3775.1 Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line Topology - 0.0% Contingent $0
Contributions into Topology or Eliminated Reinforcement Total: $0
AG1-447 Contingent Region Topology Upgrades:
TO RTEP ID Title Category Allocated Cost ($USD)
ComEd b3811.1 Expand Haumesser Road 138 kV substation as a 4 circuit breaker ring bus. Contingent $0
ComEd s3011 Replace 345kV straight bus at TSS 116 Goodings Grove with a gas insulated switchgear ("GIS") breaker and a half configuration. Contingent $0
ComEd b3775.1 Swap the NIPSCO Green Acre Tap towers from the St. John-Green Acres-Olive 345 kV line Contingent $0
AEP n9243.0 Expand Jefferson 345 kV station. Install a second 765/345 kV 750 MVA transformer. Install a second Jefferson - Clifty Creek 345 kV single circuit ~0.8 miles. Contingent $0
ComEd n9195.0 Install a new 345 kV circuit breaker at Station 12 Dresden. Contingent $0
Region Topology Upgrade Total: $0

Attachments

AG1-447 One Line Diagram

AG1-447 One Line Diagram.jpg

[1]Winter load flow analysis will be performed starting in Transition Cycle 2.