AG2-240 Phase I Study Report

v1.00 released 2025-10-29 20:11

Old Church 34.5 kV

0.0 MW Capacity / 0.0 MW Energy

Introduction

This Phase I System Impact Study Report (PH1) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, sections 307 and 308 for New Service Requests (projects) in Transition Cycle 2. The Project Developer/Eligible Customer (developer) is Mechanicsville Solar, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Virginia Electric and Power Company (d/b/a Dominion Energy Virginia).

Preface

The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
  1. PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
  2. PJM will only perform load flow analysis during the Phase I System Impact Study.
  3. In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with Affected System impacts and provides each Affected System Operator with a list of New Service Request in the Cycle with potential impacts to their respective system.
  4. PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
  5. The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase I System Impact Study:
  1. Identify required Interconnection Facilities to accommodate the New Service Request.
  2. Identify required Network Upgrades to mitigate system violations from the Phase I System Impact Study.
  3. Provide planning-level preliminary estimates of Interconnection Facilities and Network Upgrades including scope, cost and elapsed time to complete the work.

Decision Point I Requirements

At the close of Phase I System Impact Study, PJM will initiate Decision Point I (DP1). During DP1, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.A.1. Additional information on these elements is available in PJM Manual 14H sections 4.4, 6, and 7.

Allowable project modifications at Decision Point I are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

General

The Project Developer has proposed an uprate to a planned/existing Solar facility located in the Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) zone — Hanover County, Virginia. This project is an increase to the developer’s AB1-027/AE2-155 project(s), which will share the same Point of Interconnection. The AG2-240 project is a 0.0 MW uprate (0.0 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 25.0 MW with 17.5 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG2-240
Project Name:
Old Church 34.5 kV
Project Developer Name:
Mechanicsville Solar, LLC
State:
Virginia
County:
Hanover
Transmission Owner:
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
MFO:
25.0
MWE:
0.0
MWC:
0.0
Battery Storage Specification:
45.0 MWh, 4.0-hr class
Grid Charging:
Yes
Fuel Type:
Storage
Basecase Study Year:
2028

Physical Interconnection Facility Study

Physical Interconnection Facilities Study is not performed as part of the Phase I System Impact Study. Physical Interconnection Facilities Study will commence in the Phase II System Impact Study.

Point of Interconnection

AG2-240 will interconnect on the Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) distribution system at Old Church 34.5 kV Substation circuit number 474.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In the Phase I SIS, the costs shown are subject to change as a result of a facility study performed by the TO during the Phase II or Phase III System Impact Study.

Based on the Phase I SIS results, the AG2-240 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit are also shown below.

Cost Summary
DescriptionCost Allocated to AG2-240Cost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF)$0$0
Other Scope$0$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0
Network Upgrades$0$0
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$0$0
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$0$0

* Contributes to calculation for Readiness Deposit #2 (RD2). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 309 (Decision Point I) A.1.a.i and PJM Manual 14H, section 6.2, Readiness Deposit #2 (RD2) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point I (DP1), the Project Developer or Eligible Customer is required to submit Readiness Deposit #2, which is calculated as 10% of cost allocation for required Phase I Network Upgrades minus Readiness Deposit #1.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Readiness Deposit #2 Due for Project AG2-240

Readiness Deposit #2 has been calculated for the project based on the Phase I System Impact Study results and is shown in the table below. This Readiness Deposit #2 must be provided at Decision Point I through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID10% of cost allocation for Phase I Network UpgradesReadiness Deposit #1 Received (RD1)Readiness Deposit #2 (RD2) for AG2-240 Project due at DP1
ABA - B
AG2-240$0$45,000$0

Note: Failure to provide an acceptable form of Readiness Deposit #2 by the end of Decision Point I will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

No TO Interconnection Facilities or Physical Network Upgrades are required for this project.

The costs associated with interconnecting to the Dominion distribution system will be documented in the two-party Interconnection Agreement between the Project Developer and the Transmission Owner. The Project Developer will need to coordinate with the Transmission Owner for scope, cost and schedule for this physical interconnection. This PJM report identifies the effects on the transmission system.

Transmission Owner Analysis

PJM performed a power flow analysis of the transmission system using a 2028 load flow model and the results were verified by Dominion.

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. Dominion interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AG2-240 was evaluated as a 0.0 MW (0.0 MW Capacity) injection in the Dominion area.

AG2-240 was evaluated as part of a plant. The plant consists of AG2-240. The total Energy output of the plant was evaluated at its maximum seasonal capability of 25.0 MW (0.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Winter Peak Analysis

The New Service Request AG2-240 was evaluated as a 0.0 MW (0.0 MW Capacity) injection in the Dominion area.

AG2-240 was evaluated as part of a plant. The plant consists of AG2-240. The total Energy output of the plant was evaluated at its maximum seasonal capability of 25.0 MW (0.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Light Load Analysis

The New Service Request AG2-240 was evaluated as a 0.0 MW injection and 11.25 MW withdrawal in the Dominion area.

AG2-240 was evaluated as part of a plant. The plant consists of AG2-240. The total Energy output of the plant was evaluated at its maximum seasonal capability of 25.0 MW (10.92 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2DVP
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
DVP_P4-2: H2T557_SRT-L
BreakerAC122.76 %1212.0C1487.833.26

Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H2T557_SRT-L


Base Case Flowgate

Area:DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
Contingency Name:
DVP_P4-2: H2T557_SRT-L
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:122.76 %
Rating:1212.0 MVA
Rating Type:C
MVA to Mitigate:1487.83
MW Contribution:3.26
Bus #Bus NameTypeMW Contribution
3142416OLDCHRC
Solar/Wind Harmer
2.939
3142416OLDCHRC
Solar/Wind Harmer
2.247
3142416OLDCHRC
Solar/Wind Harmer
0.861
3142433PROV 92
Solar/Wind Harmer
2.528
3143316POE
Solar/Wind Harmer
2.196
3138133OCRAN
Solar/Wind Harmer
0.333
3138133OCRAN
Solar/Wind Harmer
0.166
3138283WHITEMARSH
Solar/Wind Harmer
0.029
3141766HARMONY
Solar/Wind Harmer
1.748
3141766HARMONY
Solar/Wind Harmer
0.117
3141783LANCAST
Solar/Wind Harmer
0.33
3141783LANCAST
Solar/Wind Harmer
0.22
3141913WHIT STONE
Solar/Wind Harmer
0.557
3143873LANEXA
Solar/Wind Harmer
0.363
3141873WAN 176
Solar/Wind Harmer
2.268
3141873WAN 176
Solar/Wind Harmer
0.113
3143526WINTERP
Solar/Wind Harmer
3.187
3143526WINTERP
Solar/Wind Harmer
3.187
316033AB2-134 GEN
Solar/Wind Harmer
0
3142543TWELFTH
Solar/Wind Harmer
0.069
316203AE2-005 GEN
Solar/Wind Harmer
0.001
316312AB1-027
Solar/Wind Harmer
-0.126
315671AE2-027_GEN
Solar/Wind Harmer
15.189
315813AE1-149 C
Solar/Wind Harmer
11.197
315697AD1-025 GEN
Solar/Wind Harmer
-0.001
315778AD1-151 GEN
Solar/Wind Harmer
16.098
316083AB2-161 GEN
Solar/Wind Harmer
1.846
315975AC1-164 GENB
Solar/Wind Harmer
0.661
315976AC1-164 GENA
Solar/Wind Harmer
22.332
316169AC1-164_GENC
Solar/Wind Harmer
19.293
3138126ROCKLANDING
Solar/Wind Harmer
0.055
3142946ENON
Solar/Wind Harmer
0.225
3142946ENON
Solar/Wind Harmer
0.067
944631AF1-128 GEN
50/50
133.288
944641AF1-129 GEN
50/50
72.673
961611AG1-000B GEN
Solar/Wind Harmer
7.008
961611AG1-000B GEN
Solar/Wind Harmer
10.182
962971AG1-146 GEN
Solar/Wind Harmer
3.23
962981AG1-147 GEN
Solar/Wind Harmer
7.537
966871AG1-558 GEN
Solar/Wind Harmer
3.356
966871AG1-558 GEN
Solar/Wind Harmer
-0.717
970009AG2-005 GEN
Solar/Wind Harmer
2.128
970129AG2-093 GEN
Solar/Wind Harmer
8.94
970129AG2-093 GEN
Solar/Wind Harmer
12.331
970133AG2-095 GEN
Solar/Wind Harmer
2.313
970293AG2-193 GEN
Solar/Wind Harmer
3.053
970657AG2-426 GEN
Solar/Wind Harmer
4.299
970657AG2-426 GEN
Solar/Wind Harmer
3.061
970659AG2-427 GEN
Solar/Wind Harmer
9.165
970659AG2-427 GEN
Solar/Wind Harmer
5.531
971047AG2-646 GEN
50/50
46.85
971069AG2-661 GEN
Solar/Wind Harmer
10.319
971167AH1-042 GEN
Solar/Wind Harmer
19.668
971281AH1-106 GEN
Solar/Wind Harmer
3.187
971283AH1-107 GEN
Solar/Wind Harmer
3.187
971317AH1-138 GEN
Solar/Wind Harmer
2.179
971645AH1-323 GEN
50/50
35.287
971647AH1-324 GEN
Solar/Wind Harmer
9.184
965281AG1-393 GEN
Solar/Wind Harmer
2.492
971777AH1-397 GEN
Solar/Wind Harmer
2.312
971781AH1-399 GEN
Solar/Wind Harmer
1.413
970365AG2-240 GEN
Solar/Wind Harmer
3.256
CBM West 2LTFEXP_CBM-W2->PJM
CBM
9.362
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.913
CBM South 2LTFEXP_CBM-S2->PJM
CBM
11.906
NYPJM->LTFIMP_NY
CLTF
1.373
CPLELTFEXP_CPLE->PJM
CLTF
6.26
TVALTFEXP_TVA->PJM
CLTF
1.277
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.069
MECLTFEXP_MEC->PJM
CLTF
0.296
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.172
LAGNLTFEXP_LAGN->PJM
CLTF
2.467
SIGELTFEXP_SIGE->PJM
CLTF
0.004
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
17.005
CONTINGENCY 'DVP_P4-2: H2T557_SRT-L'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 3300 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 3300 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 3118 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 3118 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
314218 to 314908 ckt 1

Short Circuit Analysis

Short Circuit analysis is not performed as part of the Phase I System Impact Study. Short Circuit analysis will commence in the Phase II System Impact Study.

Stability Analysis

Stability Analysis is Not Required.

Reactive Power Analysis

Reactive Power analysis is not performed as part of the Phase I System Impact Study. Reactive Power analysis will commence in the Phase II System Impact Study.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AB1-027Old Church 34.5 KVIn Service
AB2-134Hopewell-Surry 230kVIn Service
AB2-161Waverly #2 DP 115kVIn Service
AC1-164Chickahominy 230kVPartially in Service - Under Construction
AD1-025Hopewell-Surry 230 kVUnder Construction
AD1-151Hopewell-Surry 230 kVSuspended
AE1-149Disputanta-Poe 115 kVSuspended
AE2-005Harmony Village-Shackleford 115 kVUnder Construction
AE2-027Harrowgate-Locks 115kVUnder Construction
AF1-128Chesterfield 230 kVActive
AF1-129Chesterfield 230 kVEngineering & Procurement
AG1-146Garner DP-Lancaster 115 kVActive
AG1-147Garner DP-Lancaster 115 kVActive
AG1-393Sapony 34.5 kVActive
AG1-558Buckner 34.5 kVEngineering & Procurement
AG2-005Garner DP-Lancaster 115 kVActive
AG2-093Colonial Trail-Hopewell 230 kVActive
AG2-095Hopewell 34.5 kV (Circuit 313)Active
AG2-193Turner 34.5 kVActive
AG2-426Wakefield - Waverly 115 kVActive
AG2-427Waverly 115 kVActive
AG2-646Chesterfield 230 kVActive
AG2-661Hopewell - Colonial Trail 230 kVActive
AH1-042Providence Forge-Turner 115kVActive
AH1-106Winterpock 34.5kVActive
AH1-107Winterpock 34.5kVActive
AH1-138Penniman 34.5 kVActive
AH1-323Elmont 230 kVActive
AH1-324Colonial Trail – Surry 230 kVActive
AH1-397Shacklesford 34.5 kVActive
AH1-399North Doswell 12.5 kVActive

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with potential Affected System impacts. PJM initiates coordination with each Affected System Operator by providing a list of New Service Requests in the Cycle with potential impacts to their respective system. If the Affected System Operator indicates an Affected System Study is required, PJM will notify the Project Developer or Eligible Customer of the need for an Affected System Study. See below if any Affected System Operator requires a study for this project:

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

No cost allocated system reinforcements were identified for this project in the Phase I System Impact Study load flow analysis.

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
(Pending) / TC2-PH1-DOM-2090
Title
Add a 3rd new 3-480 MVA 230/500 kV Transformer at Elmont substation. Add one (1) 500 kV breaker and one (1) 230 kV breaker as required for the new transformer
Description
Add a 3rd new 3-480 MVA 230/500 kV Transformer at Elmont substation. Add one (1) 500 kV breaker and one (1) 230 kV breaker as required for the new transformer
Total Cost ($USD)
$40,000,000
Allocated Cost ($USD)
$0
Time Estimate
42 to 48 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG2-240 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-240 could receive cost allocation. Although AG2-240 may not presently have cost responsibility for this upgrade, AG2-240 is a potential Aggregate Pool Contributor.

FacilityContingency
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer(Any)

Attachments

AG2-240 One Line Diagram

AG2-240 One Line Diagram.pdf
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.