AG2-281 Phase I Study Report

v1.00 released 2025-10-29 22:08

Church 138 kV

50.0 MW Capacity / 50.0 MW Energy

Introduction

This Phase I System Impact Study Report (PH1) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, sections 307 and 308 for New Service Requests (projects) in Transition Cycle 2. The Project Developer/Eligible Customer (developer) is Church Storage LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Delmarva Power and Light Company.

Preface

The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
  1. PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
  2. PJM will only perform load flow analysis during the Phase I System Impact Study.
  3. In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with Affected System impacts and provides each Affected System Operator with a list of New Service Request in the Cycle with potential impacts to their respective system.
  4. PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
  5. The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase I System Impact Study:
  1. Identify required Interconnection Facilities to accommodate the New Service Request.
  2. Identify required Network Upgrades to mitigate system violations from the Phase I System Impact Study.
  3. Provide planning-level preliminary estimates of Interconnection Facilities and Network Upgrades including scope, cost and elapsed time to complete the work.

Decision Point I Requirements

At the close of Phase I System Impact Study, PJM will initiate Decision Point I (DP1). During DP1, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.A.1. Additional information on these elements is available in PJM Manual 14H sections 4.4, 6, and 7.

Allowable project modifications at Decision Point I are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

General

The Project Developer has proposed a Storage facility located in the Delmarva Power and Light Company zone — Queen Anne's County, Maryland. The installed facilities will have a total capability of 50.0 MW with 50.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG2-281
Project Name:
Church 138 kV
Project Developer Name:
Church Storage LLC
State:
Maryland
County:
Queen Anne's
Transmission Owner:
Delmarva Power and Light Company
MFO:
50.0
MWE:
50.0
MWC:
50.0
Battery Storage Specification:
200.0 MWh, 4.0-hr class
Grid Charging:
Yes
Fuel Type:
Storage
Basecase Study Year:
2028

Physical Interconnection Facility Study

Physical Interconnection Facilities Study is not performed as part of the Phase I System Impact Study. Physical Interconnection Facilities Study will commence in the Phase II System Impact Study.

Point of Interconnection

AG2-281 will interconnect on the Delmarva Power and Light Company transmission system at the Church 138 kV Substation.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In the Phase I SIS, the costs shown are subject to change as a result of a facility study performed by the TO during the Phase II or Phase III System Impact Study.

Based on the Phase I SIS results, the AG2-281 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit are also shown below.

Cost Summary
DescriptionCost Allocated to AG2-281Cost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF)$1,250,000$0
Other Scope$0$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$40,000,000$40,000,000
Network Upgrades$10,250,000$10,250,000
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$6,552,699$6,552,699
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$58,052,699$56,802,699

* Contributes to calculation for Readiness Deposit #2 (RD2). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 309 (Decision Point I) A.1.a.i and PJM Manual 14H, section 6.2, Readiness Deposit #2 (RD2) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point I (DP1), the Project Developer or Eligible Customer is required to submit Readiness Deposit #2, which is calculated as 10% of cost allocation for required Phase I Network Upgrades minus Readiness Deposit #1.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Readiness Deposit #2 Due for Project AG2-281

Readiness Deposit #2 has been calculated for the project based on the Phase I System Impact Study results and is shown in the table below. This Readiness Deposit #2 must be provided at Decision Point I through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID10% of cost allocation for Phase I Network UpgradesReadiness Deposit #1 Received (RD1)Readiness Deposit #2 (RD2) for AG2-281 Project due at DP1
ABA - B
AG2-281$5,680,270$200,000$5,480,270

Note: Failure to provide an acceptable form of Readiness Deposit #2 by the end of Decision Point I will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Interconnection Facilities
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Overhead transmission line to Point of Change in Ownership. Fiber termination from interconnection.$1,250,000 $1,250,000
Stand-Alone Network Upgrades
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Rebuild Church 138KV bus as a BAAH bus with 10 Breakers (with room for future expansion).$40,000,000 $40,000,000
Network Upgrades
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Reroute and terminate existing lines (13735, 13701 & 13833) and transformers (AT-1 & AT-2) into new substation. Reposition the existing 138 kV Cap Bank into end position. Update fiber terminations.$10,250,000 $10,250,000

Based on the scope of work for the Interconnection Facilities, it is expected to take a range of 48 to 60 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.

Transmission Owner Analysis

No impacts identified by Transmission Owner.

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. DPL interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AG2-281 was evaluated as a 50.0 MW (50.0 MW Capacity) injection in the DPL area.

AG2-281 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 50.0 MW (50.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2DP&L/PECO
CLAY_230-LINWOOD84 230.0 kV Ckt 1 line
PECO_P1-2_220-85_SRT-A/* $ DELCO $ PECO_P1-2_220-85 $ L
SingleAC119.64 %800.0B957.18.14
GD2DP&L/PECO
CLAY_230-LINWOOD84 230.0 kV Ckt 1 line
DPL_P4_2_DPEM234_SRT-A
BreakerAC110.96 %800.0B887.678.21
GD2DP&L
EDGEMR 5-CLAY_230 230.0 kV Ckt 1 line
PECO_P1-2_220-85_SRT-A/* $ DELCO $ PECO_P1-2_220-85 $ L
SingleAC114.52 %800.0B916.147.0
GD2DP&L
EDGEMR 5-CLAY_230 230.0 kV Ckt 1 line
DPL_P4_2_DPEM234_SRT-A
BreakerAC103.64 %800.0B829.17.07
GD2DP&L/PECO
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
DPL_P4_2_DPEM231_SRT-A
BreakerAC120.11 %809.0B971.676.0
GD2DP&L/PECO
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
PECO_P4_LINWO115_SRT-A/* $ DELCO $ PECO_P4_LINWO115 $ STBK
BreakerAC119.09 %809.0B963.467.5
GD2DP&L/PECO
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
DPL_P4_2_DPEM237_SRT-A
BreakerAC114.96 %809.0B930.047.01
GD2DP&L/PECO
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
PECO_P1-2_220-84_SRT-A/* $ DELCO $ PECO_P1-2_220-84 $ L
SingleAC114.1 %809.0B923.097.79
GD2DP&L/PECO
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
DPL_P1_2_CKT 23015_SRT-A
SingleAC112.3 %809.0B908.486.99
GD2DP&L
NMEREDTH-KENT 69.0 kV Ckt 1 line
DPL_P4_2_DPCEDAR231_SRT-A
BreakerAC104.52 %93.0B97.25.34
GD2DP&L
NMEREDTH-KENT 69.0 kV Ckt 1 line
DPL_P4_2_DP11_SRT-A
BreakerAC103.93 %93.0B96.667.15
GD2DP&L
NMEREDTH-KENT 69.0 kV Ckt 1 line
DPL_P4_2_DP25B_SRT-A
BreakerAC103.33 %93.0B96.15.16

Details for CLAY_230-LINWOOD84 230.0 kV Ckt 1 line l/o PECO_P1-2_220-85_SRT-A/* $ DELCO $ PECO_P1-2_220-85 $ L


Base Case Flowgate

Area:DP&L/PECO
Facility Description:
CLAY_230-LINWOOD84 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_220-85_SRT-A/* $ DELCO $ PECO_P1-2_220-85 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:119.64 %
Rating:800.0 MVA
Rating Type:B
MVA to Mitigate:957.1
MW Contribution:8.14
Bus #Bus NameTypeMW Contribution
234041AC1-190 GEN
Solar/Wind Harmer
5.286
232926CRISFLD1
Adder
1.375
231940T-011
Adder
0.514
971149AH1-027 GEN
Solar/Wind Harmer
1.939
233996TM1833_GEN
Solar/Wind Harmer
0.001
233900O-025 C
Adder
0.824
232406W1-004 FULL
Solar/Wind Harmer
0.452
972073AH1-586 GEN
Solar/Wind Harmer
6.522
972133AH1-634 GEN
Solar/Wind Harmer
2.507
972251AH1-710 GEN
Adder
11.136
219912AD2-042 GEN
Solar/Wind Helper
0.076
219766PARADISE C
Solar/Wind Helper
0.027
231901EM4
50/50
3.389
231919CHRIST1
50/50
7.27
231920CHRIST2
50/50
7.108
233968AD2-076_GEN
Solar/Wind Harmer
1.794
232432Z2-076 GEN
Solar/Wind Harmer
0.009
234033AF1-007_GEN
Solar/Wind Harmer
-0.001
232904IR4
Adder
54.989
231918WEST 1
50/50
5.427
234012AE2-112_GEN
Solar/Wind Harmer
1.794
232422X3-066 FULL
Solar/Wind Harmer
0.064
233964AF2-378 GEN
Solar/Wind Harmer
0
232426Y1-080 FULL
Solar/Wind Harmer
0
232434Z2-077 GEN
Solar/Wind Harmer
0.029
232901NORTHST
Adder
5.164
219904AC1-010 C
Solar/Wind Helper
0.03
231908HR1
50/50
2.437
232416X2-083
50/50
0.585
232424Y1-079 C
Solar/Wind Harmer
0
971747AH1-380 GEN
Solar/Wind Harmer
1.741
972069AH1-584 GEN
Solar/Wind Harmer
4.348
233970AC1-092 C
Solar/Wind Harmer
0.001
231915DC CT6
50/50
0.541
234015AF2-250 C
Solar/Wind Harmer
0
232921TASLEY2G
Adder
3.603
233990AG1-397 GEN
Solar/Wind Harmer
0.947
231505HR4
50/50
4.982
231902DC CT7
50/50
10.252
233955AB2-172 GEN
Solar/Wind Harmer
0.002
232912OH NUG1
Adder
6.164
233990AG1-397 GEN
Solar/Wind Harmer
-0.111
232813VAUGHN
Adder
0.402
231917EM10
50/50
4.368
233915AB1-141 GEN
Solar/Wind Harmer
0.2
970277AG2-181 GEN
Solar/Wind Harmer
0.419
232919VN10
Adder
2.007
232428Y3-058 C
Solar/Wind Harmer
0.001
233998TM1NIN_3.36
Solar/Wind Harmer
0.001
971195AH1-057 GEN
Solar/Wind Harmer
0.436
232404W1-003 C
Solar/Wind Harmer
0.452
232910NRG_G1
Adder
5.931
233950AC2-186 GEN
Solar/Wind Harmer
0
232900DEMECSMY
Adder
5.74
233972AC1-094 C
Solar/Wind Harmer
0.187
231900EM5
50/50
11.672
231909HR2
50/50
2.488
231131BLOOM ENRGY
50/50
4.108
234014AF1-036_GEN
Solar/Wind Harmer
1.794
233987AB2-037 GEN
Solar/Wind Harmer
0.008
234036AF2-325 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Harmer
0.001
232905CHERITON_25
Adder
1.712
232918OH NUG7
Adder
6.123
972071AH1-585 GEN
Solar/Wind Harmer
4.348
233918AB1-142 GEN
Solar/Wind Harmer
0.2
232417X3-008 C
Solar/Wind Harmer
0.001
232907VN8
Adder
21.593
960671AF2-358 GEN
Solar/Wind Harmer
8.965
233994AC2-023 GEN
Solar/Wind Harmer
0.003
233997TMININ_4.2
Solar/Wind Harmer
0.001
233971AC1-093 C
Solar/Wind Harmer
0.026
970695AG2-447 GEN
Solar/Wind Harmer
1.486
231910HR3
50/50
2.437
970431AG2-281 GEN
50/50
8.141
233933AB2-153 GEN
Solar/Wind Harmer
0.001
233984AB2-036 GEN
Solar/Wind Harmer
5.576
233944AB2-135 GEN
Solar/Wind Harmer
0.004
233946AB2-136 GEN
Solar/Wind Harmer
0.003
232408W1-005 C
Solar/Wind Harmer
0.452
232410W1-006 C
Solar/Wind Harmer
0.452
970545AG2-347 GEN
Solar/Wind Harmer
17.169
232899W1-062
Adder
5.984
233939AC1-091 C
Solar/Wind Harmer
0.001
231916EM3
50/50
1.712
231906DC3 NUG
50/50
12.824
231907DC10
50/50
3.201
233935AB2-179 C
Solar/Wind Harmer
1.137
971983AH1-536 GEN
Solar/Wind Harmer
1.376
970597AG2-380 GEN
Solar/Wind Harmer
3.213
232436AB1-176 C
Solar/Wind Harmer
0
233923SMA
Solar/Wind Harmer
0.004
232913OH NUG2
Adder
6.082
232920IR10
Adder
2.155
233973AC2-185 C
Solar/Wind Harmer
0.001
219914AD2-027 C
Solar/Wind Helper
0.058
233982AB2-133 GEN
Solar/Wind Harmer
0.003
233940AF2-379 C
Solar/Wind Harmer
0
232914OH NUG3
Adder
6.164
232916OH NUG5
Adder
6.164
233952AC2-187 GEN
Solar/Wind Harmer
0.001
233930AB2-032 GEN
Solar/Wind Harmer
0.746
965821AG1-450 GEN
Solar/Wind Harmer
3.736
232917OH NUG6
Adder
6.137
232915OH NUG4
Adder
6.123
233954AC2-188 GEN
Solar/Wind Harmer
0.001
972177AH1-672 GEN
Solar/Wind Harmer
6.808
219258KINSLEYDEP C
Solar/Wind Helper
0.04
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.096
NYPJM->LTFIMP_NY
CLTF
0.898
TVALTFEXP_TVA->PJM
CLTF
0.036
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.216
CPLELTFEXP_CPLE->PJM
CLTF
0.095
SIGELTFEXP_SIGE->PJM
CLTF
0.001
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.351
LGEELTFEXP_LGEE->PJM
CLTF
0.011
MECLTFEXP_MEC->PJM
CLTF
0.028
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.122
WECLTFEXP_WEC->PJM
CLTF
0.004
LAGNLTFEXP_LAGN->PJM
CLTF
0.07

Details for CLAY_230-LINWOOD84 230.0 kV Ckt 1 line l/o DPL_P4_2_DPEM234_SRT-A


Base Case Flowgate

Area:DP&L/PECO
Facility Description:
CLAY_230-LINWOOD84 230.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_DPEM234_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:110.96 %
Rating:800.0 MVA
Rating Type:B
MVA to Mitigate:887.67
MW Contribution:8.21
Bus #Bus NameTypeMW Contribution
232926CRISFLD1
50/50
1.474
231940T-011
50/50
0.551
234041AC1-190 GEN
Solar/Wind Harmer
6.555
971149AH1-027 GEN
Solar/Wind Harmer
2.123
233900O-025 C
50/50
0.882
234034AF2-060
50/50
1.321
233996TM1833_GEN
Solar/Wind Harmer
0.896
232406W1-004 FULL
Solar/Wind Harmer
0.706
972073AH1-586 GEN
Solar/Wind Harmer
6.585
972133AH1-634 GEN
Solar/Wind Harmer
6.81
972251AH1-710 GEN
Adder
11.41
219912AD2-042 GEN
Solar/Wind Helper
0.074
219766PARADISE C
Solar/Wind Helper
0.027
231901EM4
50/50
3.405
231919CHRIST1
50/50
7.307
231920CHRIST2
50/50
7.144
233968AD2-076_GEN
Solar/Wind Harmer
5.162
232432Z2-076 GEN
Solar/Wind Harmer
0.091
234033AF1-007_GEN
Solar/Wind Harmer
16.06
232904IR4
Adder
55.532
231918WEST 1
50/50
5.455
234012AE2-112_GEN
Solar/Wind Harmer
1.791
232422X3-066 FULL
Solar/Wind Harmer
0.194
233964AF2-378 GEN
Solar/Wind Harmer
0.093
232426Y1-080 FULL
Solar/Wind Harmer
0.139
232434Z2-077 GEN
Solar/Wind Harmer
0.173
232901NORTHST
Adder
5.22
219904AC1-010 C
Solar/Wind Helper
0.029
231908HR1
50/50
2.449
232416X2-083
50/50
0.589
232424Y1-079 C
Solar/Wind Harmer
0.435
971747AH1-380 GEN
Solar/Wind Harmer
2.52
972069AH1-584 GEN
Solar/Wind Harmer
6.292
233970AC1-092 C
Solar/Wind Harmer
0.528
231915DC CT6
50/50
0.545
232921TASLEY2G
50/50
3.86
234015AF2-250 C
Solar/Wind Harmer
0.085
233990AG1-397 GEN
Solar/Wind Harmer
0.805
231505HR4
50/50
5.001
231902DC CT7
50/50
10.335
232912OH NUG1
50/50
6.604
232813VAUGHN
50/50
0.43
233955AB2-172 GEN
Solar/Wind Harmer
3.666
233990AG1-397 GEN
Solar/Wind Harmer
0.039
231917EM10
50/50
4.389
232919VN10
50/50
2.15
232910NRG_G1
50/50
6.355
233915AB1-141 GEN
Solar/Wind Harmer
0.778
970277AG2-181 GEN
Solar/Wind Harmer
3.637
232428Y3-058 C
Solar/Wind Harmer
0.592
233998TM1NIN_3.36
Solar/Wind Harmer
0.896
971195AH1-057 GEN
Solar/Wind Harmer
0.772
232404W1-003 C
Solar/Wind Harmer
0.706
233950AC2-186 GEN
Solar/Wind Harmer
0.383
232900DEMECSMY
Adder
5.801
233972AC1-094 C
Solar/Wind Harmer
0.399
231909HR2
50/50
2.499
231131BLOOM ENRGY
50/50
4.14
232905CHERITON_25
50/50
1.835
232918OH NUG7
50/50
6.56
234014AF1-036_GEN
Solar/Wind Harmer
2.107
233987AB2-037 GEN
Solar/Wind Harmer
8.844
234036AF2-325 C
Solar/Wind Harmer
0.669
233901CHERRYDALE C
Solar/Wind Harmer
0.793
972071AH1-585 GEN
Solar/Wind Harmer
6.292
231910HR3
50/50
2.449
970431AG2-281 GEN
50/50
8.212
233933AB2-153 GEN
Solar/Wind Harmer
0.883
233984AB2-036 GEN
Solar/Wind Harmer
9.64
233944AB2-135 GEN
Solar/Wind Harmer
3.985
233946AB2-136 GEN
Solar/Wind Harmer
2.904
232408W1-005 C
Solar/Wind Harmer
0.706
232410W1-006 C
Solar/Wind Harmer
0.706
970545AG2-347 GEN
Solar/Wind Harmer
44.943
232899W1-062
Adder
6.048
233939AC1-091 C
Solar/Wind Harmer
0.528
232907VN8
50/50
23.128
232911NRG_G2
50/50
0.348
233918AB1-142 GEN
Solar/Wind Harmer
0.778
232417X3-008 C
Solar/Wind Harmer
1.466
960671AF2-358 GEN
Solar/Wind Harmer
12.971
233994AC2-023 GEN
Solar/Wind Harmer
1.912
233997TMININ_4.2
Solar/Wind Harmer
0.896
233971AC1-093 C
Solar/Wind Harmer
0.472
970695AG2-447 GEN
Solar/Wind Harmer
2.154
232914OH NUG3
50/50
6.604
232916OH NUG5
50/50
6.604
233982AB2-133 GEN
Solar/Wind Harmer
3.782
233940AF2-379 C
Solar/Wind Harmer
0.132
233952AC2-187 GEN
Solar/Wind Harmer
0.766
232616GEN FOOD
50/50
0.109
231916EM3
50/50
1.72
231906DC3 NUG
50/50
12.927
231907DC10
50/50
3.227
232913OH NUG2
50/50
6.516
232920IR10
50/50
2.309
233935AB2-179 C
Solar/Wind Harmer
2.08
971983AH1-536 GEN
Solar/Wind Harmer
5.873
970597AG2-380 GEN
Solar/Wind Harmer
3.241
232436AB1-176 C
Solar/Wind Harmer
0.178
233923SMA
Solar/Wind Harmer
3.286
233973AC2-185 C
Solar/Wind Harmer
2.173
219914AD2-027 C
Solar/Wind Helper
0.057
232917OH NUG6
50/50
6.574
232915OH NUG4
50/50
6.56
233930AB2-032 GEN
Solar/Wind Harmer
0.654
965821AG1-450 GEN
Solar/Wind Harmer
3.771
233954AC2-188 GEN
Solar/Wind Harmer
0.766
972177AH1-672 GEN
Solar/Wind Harmer
9.07
219258KINSLEYDEP C
Solar/Wind Helper
0.039
CBM West 1LTFEXP_CBM-W1->PJM
CBM
1.607
NYPJM->LTFIMP_NY
CLTF
0.833
TVALTFEXP_TVA->PJM
CLTF
0.141
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.529
CPLELTFEXP_CPLE->PJM
CLTF
0.209
SIGELTFEXP_SIGE->PJM
CLTF
0.006
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.746
LGEELTFEXP_LGEE->PJM
CLTF
0.083
MECLTFEXP_MEC->PJM
CLTF
0.202
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.516
WECLTFEXP_WEC->PJM
CLTF
0.044
LAGNLTFEXP_LAGN->PJM
CLTF
0.28

Details for EDGEMR 5-CLAY_230 230.0 kV Ckt 1 line l/o PECO_P1-2_220-85_SRT-A/* $ DELCO $ PECO_P1-2_220-85 $ L


Base Case Flowgate

Area:DP&L
Facility Description:
EDGEMR 5-CLAY_230 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_220-85_SRT-A/* $ DELCO $ PECO_P1-2_220-85 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:114.52 %
Rating:800.0 MVA
Rating Type:B
MVA to Mitigate:916.14
MW Contribution:7.0
Bus #Bus NameTypeMW Contribution
234041AC1-190 GEN
Solar/Wind Harmer
4.665
232926CRISFLD1
Adder
1.216
231940T-011
Adder
0.454
971149AH1-027 GEN
Solar/Wind Harmer
1.711
233996TM1833_GEN
Solar/Wind Harmer
0.001
233900O-025 C
Adder
0.728
232406W1-004 FULL
Solar/Wind Harmer
0.4
972073AH1-586 GEN
Solar/Wind Harmer
5.765
972133AH1-634 GEN
Solar/Wind Harmer
2.216
231901EM4
50/50
2.487
231919CHRIST1
50/50
5.399
231920CHRIST2
50/50
5.279
233968AD2-076_GEN
Solar/Wind Harmer
1.559
232432Z2-076 GEN
Solar/Wind Harmer
0.008
234033AF1-007_GEN
Solar/Wind Harmer
-0.001
232904IR4
Adder
48.592
231918WEST 1
50/50
3.456
234012AE2-112_GEN
Solar/Wind Harmer
1.559
232422X3-066 FULL
Solar/Wind Harmer
0.056
233964AF2-378 GEN
Solar/Wind Harmer
0
232426Y1-080 FULL
Solar/Wind Harmer
0
232434Z2-077 GEN
Solar/Wind Harmer
0.025
232901NORTHST
Adder
4.558
231908HR1
50/50
1.788
232416X2-083
50/50
0.491
232424Y1-079 C
Solar/Wind Harmer
0
971747AH1-380 GEN
Solar/Wind Harmer
1.539
972069AH1-584 GEN
Solar/Wind Harmer
3.843
233970AC1-092 C
Solar/Wind Harmer
0.001
231915DC CT6
50/50
0.444
234015AF2-250 C
Solar/Wind Harmer
0
232921TASLEY2G
Adder
3.185
233990AG1-397 GEN
Solar/Wind Harmer
0.837
231505HR4
50/50
4.981
231902DC CT7
50/50
8.417
233955AB2-172 GEN
Solar/Wind Harmer
0.002
232912OH NUG1
Adder
5.449
233990AG1-397 GEN
Solar/Wind Harmer
-0.098
232813VAUGHN
Adder
0.351
231917EM10
50/50
2.344
233915AB1-141 GEN
Solar/Wind Harmer
0.172
970277AG2-181 GEN
Solar/Wind Harmer
0.37
232919VN10
Adder
1.774
232428Y3-058 C
Solar/Wind Harmer
0.001
233998TM1NIN_3.36
Solar/Wind Harmer
0.001
971195AH1-057 GEN
Solar/Wind Harmer
0.386
232404W1-003 C
Solar/Wind Harmer
0.4
232910NRG_G1
Adder
5.178
233950AC2-186 GEN
Solar/Wind Harmer
0
232900DEMECSMY
Adder
5.047
233972AC1-094 C
Solar/Wind Harmer
0.165
231900EM5
50/50
11.67
231909HR2
50/50
1.335
231131BLOOM ENRGY
50/50
3.352
233987AB2-037 GEN
Solar/Wind Harmer
0.007
234014AF1-036_GEN
Solar/Wind Harmer
1.559
234036AF2-325 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Harmer
0.001
232905CHERITON_25
Adder
1.514
232918OH NUG7
Adder
5.413
972071AH1-585 GEN
Solar/Wind Harmer
3.843
233918AB1-142 GEN
Solar/Wind Harmer
0.172
232417X3-008 C
Solar/Wind Harmer
0.001
232907VN8
Adder
19.104
231910HR3
50/50
1.788
970431AG2-281 GEN
50/50
6.998
233933AB2-153 GEN
Solar/Wind Harmer
0.001
233984AB2-036 GEN
Solar/Wind Harmer
4.877
233944AB2-135 GEN
Solar/Wind Harmer
0.003
233946AB2-136 GEN
Solar/Wind Harmer
0.003
232408W1-005 C
Solar/Wind Harmer
0.4
232410W1-006 C
Solar/Wind Harmer
0.4
970545AG2-347 GEN
Solar/Wind Harmer
15.172
232899W1-062
Adder
5.262
233939AC1-091 C
Solar/Wind Harmer
0.001
960671AF2-358 GEN
Solar/Wind Harmer
7.92
233994AC2-023 GEN
Solar/Wind Harmer
0.003
233997TMININ_4.2
Solar/Wind Harmer
0.001
233971AC1-093 C
Solar/Wind Harmer
0.022
970695AG2-447 GEN
Solar/Wind Harmer
1.309
231916EM3
50/50
0.918
231906DC3 NUG
50/50
10.528
231907DC10
50/50
2.628
233935AB2-179 C
Solar/Wind Harmer
0.954
971983AH1-536 GEN
Solar/Wind Harmer
1.189
970597AG2-380 GEN
Solar/Wind Harmer
2.792
232436AB1-176 C
Solar/Wind Harmer
0
233923SMA
Solar/Wind Harmer
0.003
232913OH NUG2
Adder
5.377
232920IR10
Adder
1.904
233973AC2-185 C
Solar/Wind Harmer
0.001
233982AB2-133 GEN
Solar/Wind Harmer
0.003
233940AF2-379 C
Solar/Wind Harmer
0
232914OH NUG3
Adder
5.449
232916OH NUG5
Adder
5.449
233952AC2-187 GEN
Solar/Wind Harmer
0.001
233930AB2-032 GEN
Solar/Wind Harmer
0.644
965821AG1-450 GEN
Solar/Wind Harmer
3.3
232917OH NUG6
Adder
5.425
232915OH NUG4
Adder
5.413
233954AC2-188 GEN
Solar/Wind Harmer
0.001
972177AH1-672 GEN
Solar/Wind Harmer
6.007
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.209
NYPJM->LTFIMP_NY
CLTF
0.789
TVALTFEXP_TVA->PJM
CLTF
0.041
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.216
CPLELTFEXP_CPLE->PJM
CLTF
0.093
SIGELTFEXP_SIGE->PJM
CLTF
0.001
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.424
LGEELTFEXP_LGEE->PJM
CLTF
0.016
MECLTFEXP_MEC->PJM
CLTF
0.039
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.14
WECLTFEXP_WEC->PJM
CLTF
0.007
LAGNLTFEXP_LAGN->PJM
CLTF
0.079

Details for EDGEMR 5-CLAY_230 230.0 kV Ckt 1 line l/o DPL_P4_2_DPEM234_SRT-A


Base Case Flowgate

Area:DP&L
Facility Description:
EDGEMR 5-CLAY_230 230.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_DPEM234_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.64 %
Rating:800.0 MVA
Rating Type:B
MVA to Mitigate:829.1
MW Contribution:7.07
Bus #Bus NameTypeMW Contribution
232926CRISFLD1
50/50
1.304
231940T-011
50/50
0.487
234041AC1-190 GEN
Solar/Wind Harmer
5.791
971149AH1-027 GEN
Solar/Wind Harmer
1.876
233900O-025 C
50/50
0.781
234034AF2-060
50/50
1.169
233996TM1833_GEN
Solar/Wind Harmer
0.793
232406W1-004 FULL
Solar/Wind Harmer
0.625
972073AH1-586 GEN
Solar/Wind Harmer
5.827
972133AH1-634 GEN
Solar/Wind Harmer
6.024
231901EM4
50/50
2.503
231919CHRIST1
50/50
5.435
231920CHRIST2
50/50
5.314
233968AD2-076_GEN
Solar/Wind Harmer
4.491
232432Z2-076 GEN
Solar/Wind Harmer
0.081
234033AF1-007_GEN
Solar/Wind Harmer
14.208
232904IR4
Adder
49.125
231918WEST 1
50/50
3.483
234012AE2-112_GEN
Solar/Wind Harmer
1.558
232422X3-066 FULL
Solar/Wind Harmer
0.168
233964AF2-378 GEN
Solar/Wind Harmer
0.082
232426Y1-080 FULL
Solar/Wind Harmer
0.123
232434Z2-077 GEN
Solar/Wind Harmer
0.153
232901NORTHST
Adder
4.612
231908HR1
50/50
1.8
232416X2-083
50/50
0.495
232424Y1-079 C
Solar/Wind Harmer
0.38
971747AH1-380 GEN
Solar/Wind Harmer
2.23
972069AH1-584 GEN
Solar/Wind Harmer
5.568
233970AC1-092 C
Solar/Wind Harmer
0.466
231915DC CT6
50/50
0.448
232921TASLEY2G
50/50
3.416
234015AF2-250 C
Solar/Wind Harmer
0.075
233990AG1-397 GEN
Solar/Wind Harmer
0.712
231505HR4
50/50
4.999
231902DC CT7
50/50
8.498
232912OH NUG1
50/50
5.844
233955AB2-172 GEN
Solar/Wind Harmer
3.238
233990AG1-397 GEN
Solar/Wind Harmer
0.034
232813VAUGHN
Adder
0.355
231917EM10
50/50
2.364
232919VN10
50/50
1.902
233915AB1-141 GEN
Solar/Wind Harmer
0.672
970277AG2-181 GEN
Solar/Wind Harmer
3.216
232428Y3-058 C
Solar/Wind Harmer
0.524
233998TM1NIN_3.36
Solar/Wind Harmer
0.793
971195AH1-057 GEN
Solar/Wind Harmer
0.683
232404W1-003 C
Solar/Wind Harmer
0.625
232910NRG_G1
Adder
5.235
233950AC2-186 GEN
Solar/Wind Harmer
0.337
232900DEMECSMY
Adder
5.108
233972AC1-094 C
Solar/Wind Harmer
0.352
231909HR2
50/50
1.346
231131BLOOM ENRGY
50/50
3.383
232905CHERITON_25
50/50
1.624
232918OH NUG7
50/50
5.806
233987AB2-037 GEN
Solar/Wind Harmer
7.868
234014AF1-036_GEN
Solar/Wind Harmer
1.833
234036AF2-325 C
Solar/Wind Harmer
0.591
233901CHERRYDALE C
Solar/Wind Harmer
0.702
972071AH1-585 GEN
Solar/Wind Harmer
5.568
232907VN8
50/50
20.483
233918AB1-142 GEN
Solar/Wind Harmer
0.672
232417X3-008 C
Solar/Wind Harmer
1.295
960671AF2-358 GEN
Solar/Wind Harmer
11.471
233994AC2-023 GEN
Solar/Wind Harmer
1.691
233997TMININ_4.2
Solar/Wind Harmer
0.793
233971AC1-093 C
Solar/Wind Harmer
0.416
970695AG2-447 GEN
Solar/Wind Harmer
1.899
231910HR3
50/50
1.8
970431AG2-281 GEN
50/50
7.067
233933AB2-153 GEN
Solar/Wind Harmer
0.763
233984AB2-036 GEN
Solar/Wind Harmer
8.441
233944AB2-135 GEN
Solar/Wind Harmer
3.446
233946AB2-136 GEN
Solar/Wind Harmer
2.567
232408W1-005 C
Solar/Wind Harmer
0.625
232410W1-006 C
Solar/Wind Harmer
0.625
970545AG2-347 GEN
Solar/Wind Harmer
39.758
232899W1-062
Adder
5.325
233939AC1-091 C
Solar/Wind Harmer
0.466
231916EM3
50/50
0.926
231906DC3 NUG
50/50
10.629
231907DC10
50/50
2.654
232913OH NUG2
50/50
5.767
232920IR10
50/50
2.042
233935AB2-179 C
Solar/Wind Harmer
1.749
971983AH1-536 GEN
Solar/Wind Harmer
5.079
970597AG2-380 GEN
Solar/Wind Harmer
2.82
232436AB1-176 C
Solar/Wind Harmer
0.154
233923SMA
Solar/Wind Harmer
2.908
233973AC2-185 C
Solar/Wind Harmer
1.915
232914OH NUG3
50/50
5.844
232916OH NUG5
50/50
5.844
233982AB2-133 GEN
Solar/Wind Harmer
3.263
233940AF2-379 C
Solar/Wind Harmer
0.117
233952AC2-187 GEN
Solar/Wind Harmer
0.675
232917OH NUG6
50/50
5.819
232915OH NUG4
50/50
5.806
233930AB2-032 GEN
Solar/Wind Harmer
0.566
965821AG1-450 GEN
Solar/Wind Harmer
3.335
233954AC2-188 GEN
Solar/Wind Harmer
0.675
972177AH1-672 GEN
Solar/Wind Harmer
8.012
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.529
CPLELTFEXP_CPLE->PJM
CLTF
0.207
SIGELTFEXP_SIGE->PJM
CLTF
0.007
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.534
WECLTFEXP_WEC->PJM
CLTF
0.047
LAGNLTFEXP_LAGN->PJM
CLTF
0.289
CBM West 1LTFEXP_CBM-W1->PJM
CBM
1.718
NYPJM->LTFIMP_NY
CLTF
0.724
TVALTFEXP_TVA->PJM
CLTF
0.145
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.818
LGEELTFEXP_LGEE->PJM
CLTF
0.087
MECLTFEXP_MEC->PJM
CLTF
0.213

Details for EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line l/o DPL_P4_2_DPEM231_SRT-A


Base Case Flowgate

Area:DP&L/PECO
Facility Description:
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_DPEM231_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:120.11 %
Rating:809.0 MVA
Rating Type:B
MVA to Mitigate:971.67
MW Contribution:6.0
Bus #Bus NameTypeMW Contribution
232926CRISFLD1
50/50
1.17
231940T-011
50/50
0.436
234041AC1-190 GEN
Solar/Wind Harmer
5.178
971149AH1-027 GEN
Solar/Wind Harmer
1.671
233900O-025 C
50/50
0.699
234034AF2-060
50/50
1.048
233996TM1833_GEN
Solar/Wind Harmer
0.711
232406W1-004 FULL
Solar/Wind Harmer
0.56
972073AH1-586 GEN
Solar/Wind Harmer
5.222
972133AH1-634 GEN
Solar/Wind Harmer
5.392
232904IR4
50/50
46.661
231919CHRIST1
50/50
2.412
231920CHRIST2
50/50
2.358
233968AD2-076_GEN
Solar/Wind Harmer
3.897
232432Z2-076 GEN
Solar/Wind Harmer
0.072
234033AF1-007_GEN
Solar/Wind Harmer
12.718
231918WEST 1
50/50
1.858
234012AE2-112_GEN
Solar/Wind Harmer
1.352
232422X3-066 FULL
Solar/Wind Harmer
0.145
233964AF2-378 GEN
Solar/Wind Harmer
0.074
232426Y1-080 FULL
Solar/Wind Harmer
0.11
232434Z2-077 GEN
Solar/Wind Harmer
0.137
232901NORTHST
Adder
4.108
232416X2-083
50/50
0.407
231908HR1
50/50
0.685
232424Y1-079 C
Solar/Wind Harmer
0.333
971747AH1-380 GEN
Solar/Wind Harmer
1.999
972069AH1-584 GEN
Solar/Wind Harmer
4.99
233970AC1-092 C
Solar/Wind Harmer
0.412
232921TASLEY2G
50/50
3.062
231915DC CT6
50/50
0.334
234015AF2-250 C
Solar/Wind Harmer
0.067
233990AG1-397 GEN
Solar/Wind Harmer
0.638
231505HR4
50/50
5.52
232912OH NUG1
50/50
5.239
231902DC CT7
50/50
6.326
232813VAUGHN
50/50
0.331
233955AB2-172 GEN
Solar/Wind Harmer
2.895
233990AG1-397 GEN
Solar/Wind Harmer
0.031
232919VN10
50/50
1.704
232910NRG_G1
50/50
4.853
233915AB1-141 GEN
Solar/Wind Harmer
0.576
970277AG2-181 GEN
Solar/Wind Harmer
2.88
232428Y3-058 C
Solar/Wind Harmer
0.469
233998TM1NIN_3.36
Solar/Wind Harmer
0.711
232404W1-003 C
Solar/Wind Harmer
0.56
971195AH1-057 GEN
Solar/Wind Harmer
0.612
233950AC2-186 GEN
Solar/Wind Harmer
0.299
232900DEMECSMY
Adder
4.518
233972AC1-094 C
Solar/Wind Harmer
0.311
231917EM10
Adder
0.888
231900EM5
50/50
12.933
232905CHERITON_25
50/50
1.456
232918OH NUG7
50/50
5.204
231131BLOOM ENRGY
50/50
2.471
233987AB2-037 GEN
Solar/Wind Harmer
7.141
234014AF1-036_GEN
Solar/Wind Harmer
1.591
234036AF2-325 C
Solar/Wind Harmer
0.529
233901CHERRYDALE C
Solar/Wind Harmer
0.629
972071AH1-585 GEN
Solar/Wind Harmer
4.99
970431AG2-281 GEN
50/50
5.996
231910HR3
50/50
0.685
233984AB2-036 GEN
Solar/Wind Harmer
7.423
233933AB2-153 GEN
Solar/Wind Harmer
0.654
233946AB2-136 GEN
Solar/Wind Harmer
2.298
233944AB2-135 GEN
Solar/Wind Harmer
2.951
232408W1-005 C
Solar/Wind Harmer
0.56
232410W1-006 C
Solar/Wind Harmer
0.56
970545AG2-347 GEN
Solar/Wind Harmer
35.589
232899W1-062
Adder
4.71
233939AC1-091 C
Solar/Wind Harmer
0.412
232907VN8
50/50
18.401
232911NRG_G2
50/50
0.265
233918AB1-142 GEN
Solar/Wind Harmer
0.576
232417X3-008 C
Solar/Wind Harmer
1.158
960671AF2-358 GEN
Solar/Wind Harmer
10.274
233994AC2-023 GEN
Solar/Wind Harmer
1.516
233997TMININ_4.2
Solar/Wind Harmer
0.711
233971AC1-093 C
Solar/Wind Harmer
0.368
970695AG2-447 GEN
Solar/Wind Harmer
1.682
232914OH NUG3
50/50
5.239
232916OH NUG5
50/50
5.239
233982AB2-133 GEN
Solar/Wind Harmer
2.783
233940AF2-379 C
Solar/Wind Harmer
0.105
233952AC2-187 GEN
Solar/Wind Harmer
0.598
232616GEN FOOD
50/50
0.085
232917OH NUG6
50/50
5.216
232915OH NUG4
50/50
5.204
233930AB2-032 GEN
Solar/Wind Harmer
0.485
965821AG1-450 GEN
Solar/Wind Harmer
2.987
972177AH1-672 GEN
Solar/Wind Harmer
7.148
233954AC2-188 GEN
Solar/Wind Harmer
0.598
232913OH NUG2
50/50
5.169
232920IR10
50/50
1.828
231906DC3 NUG
50/50
7.913
231907DC10
50/50
1.976
970597AG2-380 GEN
Solar/Wind Harmer
2.447
971983AH1-536 GEN
Solar/Wind Harmer
4.354
232436AB1-176 C
Solar/Wind Harmer
0.133
233935AB2-179 C
Solar/Wind Harmer
1.409
233923SMA
Solar/Wind Harmer
2.608
233973AC2-185 C
Solar/Wind Harmer
1.696
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.368
NYPJM->LTFIMP_NY
CLTF
0.709
TVALTFEXP_TVA->PJM
CLTF
0.049
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.232
CPLELTFEXP_CPLE->PJM
CLTF
0.098
SIGELTFEXP_SIGE->PJM
CLTF
0.002
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.548
LGEELTFEXP_LGEE->PJM
CLTF
0.023
MECLTFEXP_MEC->PJM
CLTF
0.056
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.173
WECLTFEXP_WEC->PJM
CLTF
0.011
LAGNLTFEXP_LAGN->PJM
CLTF
0.096

Details for EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line l/o PECO_P4_LINWO115_SRT-A/* $ DELCO $ PECO_P4_LINWO115 $ STBK


Base Case Flowgate

Area:DP&L/PECO
Facility Description:
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_LINWO115_SRT-A/* $ DELCO $ PECO_P4_LINWO115 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:119.09 %
Rating:809.0 MVA
Rating Type:B
MVA to Mitigate:963.46
MW Contribution:7.5
Bus #Bus NameTypeMW Contribution
234041AC1-190 GEN
Solar/Wind Harmer
6.011
232926CRISFLD1
Adder
1.274
231940T-011
Adder
0.476
971149AH1-027 GEN
Solar/Wind Harmer
1.945
233996TM1833_GEN
Solar/Wind Harmer
0.822
233900O-025 C
Adder
0.762
232406W1-004 FULL
Solar/Wind Harmer
0.647
972073AH1-586 GEN
Solar/Wind Harmer
6.039
972133AH1-634 GEN
Solar/Wind Harmer
6.244
231901EM4
50/50
3.04
231919CHRIST1
50/50
6.533
231920CHRIST2
50/50
6.388
233968AD2-076_GEN
Solar/Wind Harmer
4.722
232432Z2-076 GEN
Solar/Wind Harmer
0.084
234033AF1-007_GEN
Solar/Wind Harmer
14.725
232904IR4
Adder
50.915
231918WEST 1
50/50
4.77
234012AE2-112_GEN
Solar/Wind Harmer
1.638
232422X3-066 FULL
Solar/Wind Harmer
0.177
233964AF2-378 GEN
Solar/Wind Harmer
0.085
232426Y1-080 FULL
Solar/Wind Harmer
0.127
232434Z2-077 GEN
Solar/Wind Harmer
0.159
232901NORTHST
Adder
4.782
231908HR1
50/50
2.186
232416X2-083
50/50
0.537
232424Y1-079 C
Solar/Wind Harmer
0.398
971747AH1-380 GEN
Solar/Wind Harmer
2.311
972069AH1-584 GEN
Solar/Wind Harmer
5.77
233970AC1-092 C
Solar/Wind Harmer
0.483
231915DC CT6
50/50
0.494
234015AF2-250 C
Solar/Wind Harmer
0.078
232921TASLEY2G
Adder
3.336
233990AG1-397 GEN
Solar/Wind Harmer
0.738
231505HR4
50/50
4.716
231902DC CT7
50/50
9.368
233955AB2-172 GEN
Solar/Wind Harmer
3.362
232912OH NUG1
Adder
5.708
233990AG1-397 GEN
Solar/Wind Harmer
0.036
232813VAUGHN
Adder
0.371
231917EM10
50/50
3.756
233915AB1-141 GEN
Solar/Wind Harmer
0.711
970277AG2-181 GEN
Solar/Wind Harmer
3.335
232919VN10
Adder
1.858
232428Y3-058 C
Solar/Wind Harmer
0.543
233998TM1NIN_3.36
Solar/Wind Harmer
0.822
971195AH1-057 GEN
Solar/Wind Harmer
0.708
232404W1-003 C
Solar/Wind Harmer
0.647
232910NRG_G1
Adder
5.48
233950AC2-186 GEN
Solar/Wind Harmer
0.351
232900DEMECSMY
Adder
5.311
233972AC1-094 C
Solar/Wind Harmer
0.365
231900EM5
50/50
11.049
231909HR2
50/50
2.139
231131BLOOM ENRGY
50/50
3.75
233987AB2-037 GEN
Solar/Wind Harmer
8.123
234014AF1-036_GEN
Solar/Wind Harmer
1.927
234036AF2-325 C
Solar/Wind Harmer
0.613
233901CHERRYDALE C
Solar/Wind Harmer
0.728
232905CHERITON_25
Adder
1.586
232918OH NUG7
Adder
5.669
972071AH1-585 GEN
Solar/Wind Harmer
5.77
231910HR3
50/50
2.186
970431AG2-281 GEN
50/50
7.499
233933AB2-153 GEN
Solar/Wind Harmer
0.807
233984AB2-036 GEN
Solar/Wind Harmer
8.829
233944AB2-135 GEN
Solar/Wind Harmer
3.642
233946AB2-136 GEN
Solar/Wind Harmer
2.663
232408W1-005 C
Solar/Wind Harmer
0.647
232410W1-006 C
Solar/Wind Harmer
0.647
970545AG2-347 GEN
Solar/Wind Harmer
41.207
232899W1-062
Adder
5.537
233939AC1-091 C
Solar/Wind Harmer
0.483
233918AB1-142 GEN
Solar/Wind Harmer
0.711
232417X3-008 C
Solar/Wind Harmer
1.345
232907VN8
Adder
19.996
960671AF2-358 GEN
Solar/Wind Harmer
11.896
233994AC2-023 GEN
Solar/Wind Harmer
1.753
233997TMININ_4.2
Solar/Wind Harmer
0.822
233971AC1-093 C
Solar/Wind Harmer
0.432
970695AG2-447 GEN
Solar/Wind Harmer
1.972
233982AB2-133 GEN
Solar/Wind Harmer
3.455
233940AF2-379 C
Solar/Wind Harmer
0.121
232914OH NUG3
Adder
5.708
232916OH NUG5
Adder
5.708
233952AC2-187 GEN
Solar/Wind Harmer
0.702
233930AB2-032 GEN
Solar/Wind Harmer
0.598
965821AG1-450 GEN
Solar/Wind Harmer
3.458
232917OH NUG6
Adder
5.682
232915OH NUG4
Adder
5.669
233954AC2-188 GEN
Solar/Wind Harmer
0.702
972177AH1-672 GEN
Solar/Wind Harmer
8.313
231916EM3
50/50
1.472
231906DC3 NUG
50/50
11.719
231907DC10
50/50
2.926
233935AB2-179 C
Solar/Wind Harmer
1.892
971983AH1-536 GEN
Solar/Wind Harmer
5.367
970597AG2-380 GEN
Solar/Wind Harmer
2.965
232436AB1-176 C
Solar/Wind Harmer
0.162
233923SMA
Solar/Wind Harmer
3.014
232913OH NUG2
Adder
5.631
232920IR10
Adder
1.995
233973AC2-185 C
Solar/Wind Harmer
1.989
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.356
NYPJM->LTFIMP_NY
CLTF
0.818
TVALTFEXP_TVA->PJM
CLTF
0.052
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.255
CPLELTFEXP_CPLE->PJM
CLTF
0.108
SIGELTFEXP_SIGE->PJM
CLTF
0.002
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.571
LGEELTFEXP_LGEE->PJM
CLTF
0.023
MECLTFEXP_MEC->PJM
CLTF
0.056
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.183
WECLTFEXP_WEC->PJM
CLTF
0.011
LAGNLTFEXP_LAGN->PJM
CLTF
0.102

Details for EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line l/o DPL_P4_2_DPEM237_SRT-A


Base Case Flowgate

Area:DP&L/PECO
Facility Description:
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_DPEM237_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:114.96 %
Rating:809.0 MVA
Rating Type:B
MVA to Mitigate:930.04
MW Contribution:7.01
Bus #Bus NameTypeMW Contribution
234041AC1-190 GEN
Solar/Wind Harmer
5.739
232926CRISFLD1
Adder
1.218
231940T-011
Adder
0.455
971149AH1-027 GEN
Solar/Wind Harmer
1.857
233996TM1833_GEN
Solar/Wind Harmer
0.786
233900O-025 C
Adder
0.729
232406W1-004 FULL
Solar/Wind Harmer
0.619
972073AH1-586 GEN
Solar/Wind Harmer
5.773
972133AH1-634 GEN
Solar/Wind Harmer
5.967
231901EM4
50/50
2.512
231919CHRIST1
50/50
5.45
231920CHRIST2
50/50
5.329
233968AD2-076_GEN
Solar/Wind Harmer
4.455
232432Z2-076 GEN
Solar/Wind Harmer
0.08
234033AF1-007_GEN
Solar/Wind Harmer
14.074
232904IR4
Adder
48.665
231918WEST 1
50/50
3.525
234012AE2-112_GEN
Solar/Wind Harmer
1.546
232422X3-066 FULL
Solar/Wind Harmer
0.167
233964AF2-378 GEN
Solar/Wind Harmer
0.082
232426Y1-080 FULL
Solar/Wind Harmer
0.121
232434Z2-077 GEN
Solar/Wind Harmer
0.152
232901NORTHST
Adder
4.567
231908HR1
50/50
1.806
232416X2-083
50/50
0.492
232424Y1-079 C
Solar/Wind Harmer
0.377
971747AH1-380 GEN
Solar/Wind Harmer
2.21
972069AH1-584 GEN
Solar/Wind Harmer
5.516
233970AC1-092 C
Solar/Wind Harmer
0.461
231915DC CT6
50/50
0.446
234015AF2-250 C
Solar/Wind Harmer
0.074
232921TASLEY2G
Adder
3.19
233990AG1-397 GEN
Solar/Wind Harmer
0.706
231902DC CT7
50/50
8.457
233955AB2-172 GEN
Solar/Wind Harmer
3.209
232912OH NUG1
Adder
5.457
233990AG1-397 GEN
Solar/Wind Harmer
0.034
232813VAUGHN
Adder
0.352
231917EM10
50/50
2.423
233915AB1-141 GEN
Solar/Wind Harmer
0.667
970277AG2-181 GEN
Solar/Wind Harmer
3.187
232919VN10
Adder
1.776
232428Y3-058 C
Solar/Wind Harmer
0.519
233998TM1NIN_3.36
Solar/Wind Harmer
0.786
971195AH1-057 GEN
Solar/Wind Harmer
0.677
232404W1-003 C
Solar/Wind Harmer
0.619
232910NRG_G1
Adder
5.189
233950AC2-186 GEN
Solar/Wind Harmer
0.334
232900DEMECSMY
Adder
5.058
233972AC1-094 C
Solar/Wind Harmer
0.348
231900EM5
50/50
11.582
231909HR2
50/50
1.38
231131BLOOM ENRGY
50/50
3.369
233987AB2-037 GEN
Solar/Wind Harmer
7.797
234014AF1-036_GEN
Solar/Wind Harmer
1.818
234036AF2-325 C
Solar/Wind Harmer
0.586
233901CHERRYDALE C
Solar/Wind Harmer
0.696
232905CHERITON_25
Adder
1.516
232918OH NUG7
Adder
5.42
972071AH1-585 GEN
Solar/Wind Harmer
5.516
231910HR3
50/50
1.806
970431AG2-281 GEN
50/50
7.015
233933AB2-153 GEN
Solar/Wind Harmer
0.757
233984AB2-036 GEN
Solar/Wind Harmer
8.371
233944AB2-135 GEN
Solar/Wind Harmer
3.419
233946AB2-136 GEN
Solar/Wind Harmer
2.544
232408W1-005 C
Solar/Wind Harmer
0.619
232410W1-006 C
Solar/Wind Harmer
0.619
970545AG2-347 GEN
Solar/Wind Harmer
39.385
232899W1-062
Adder
5.273
233939AC1-091 C
Solar/Wind Harmer
0.461
233918AB1-142 GEN
Solar/Wind Harmer
0.667
232417X3-008 C
Solar/Wind Harmer
1.284
232907VN8
Adder
19.127
960671AF2-358 GEN
Solar/Wind Harmer
11.367
233994AC2-023 GEN
Solar/Wind Harmer
1.676
233997TMININ_4.2
Solar/Wind Harmer
0.786
233971AC1-093 C
Solar/Wind Harmer
0.412
970695AG2-447 GEN
Solar/Wind Harmer
1.88
233982AB2-133 GEN
Solar/Wind Harmer
3.238
233940AF2-379 C
Solar/Wind Harmer
0.116
232914OH NUG3
Adder
5.457
232916OH NUG5
Adder
5.457
233952AC2-187 GEN
Solar/Wind Harmer
0.669
233930AB2-032 GEN
Solar/Wind Harmer
0.561
965821AG1-450 GEN
Solar/Wind Harmer
3.304
232917OH NUG6
Adder
5.433
232915OH NUG4
Adder
5.42
233954AC2-188 GEN
Solar/Wind Harmer
0.669
231916EM3
50/50
0.949
231906DC3 NUG
50/50
10.579
231907DC10
50/50
2.641
233935AB2-179 C
Solar/Wind Harmer
1.738
971983AH1-536 GEN
Solar/Wind Harmer
5.04
970597AG2-380 GEN
Solar/Wind Harmer
2.797
232436AB1-176 C
Solar/Wind Harmer
0.153
233923SMA
Solar/Wind Harmer
2.882
232913OH NUG2
Adder
5.384
232920IR10
Adder
1.907
233973AC2-185 C
Solar/Wind Harmer
1.896
972177AH1-672 GEN
Solar/Wind Harmer
7.937
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.844
NYPJM->LTFIMP_NY
CLTF
0.759
TVALTFEXP_TVA->PJM
CLTF
0.085
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.347
CPLELTFEXP_CPLE->PJM
CLTF
0.141
SIGELTFEXP_SIGE->PJM
CLTF
0.004
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.009
LGEELTFEXP_LGEE->PJM
CLTF
0.046
MECLTFEXP_MEC->PJM
CLTF
0.112
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.306
WECLTFEXP_WEC->PJM
CLTF
0.024
LAGNLTFEXP_LAGN->PJM
CLTF
0.167

Details for EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line l/o PECO_P1-2_220-84_SRT-A/* $ DELCO $ PECO_P1-2_220-84 $ L


Base Case Flowgate

Area:DP&L/PECO
Facility Description:
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_220-84_SRT-A/* $ DELCO $ PECO_P1-2_220-84 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:114.1 %
Rating:809.0 MVA
Rating Type:B
MVA to Mitigate:923.09
MW Contribution:7.79
Bus #Bus NameTypeMW Contribution
234041AC1-190 GEN
Solar/Wind Harmer
5.086
232926CRISFLD1
Adder
1.324
231940T-011
Adder
0.495
971149AH1-027 GEN
Solar/Wind Harmer
1.865
233996TM1833_GEN
Solar/Wind Harmer
0.001
233900O-025 C
Adder
0.792
232406W1-004 FULL
Solar/Wind Harmer
0.435
972073AH1-586 GEN
Solar/Wind Harmer
6.276
972133AH1-634 GEN
Solar/Wind Harmer
2.413
219912AD2-042 GEN
Solar/Wind Helper
0.073
219766PARADISE C
Solar/Wind Helper
0.026
231901EM4
50/50
3.162
231919CHRIST1
50/50
6.795
231920CHRIST2
50/50
6.644
233968AD2-076_GEN
Solar/Wind Harmer
1.721
232432Z2-076 GEN
Solar/Wind Harmer
0.009
234033AF1-007_GEN
Solar/Wind Harmer
-0.001
232904IR4
Adder
52.916
231918WEST 1
50/50
4.961
234012AE2-112_GEN
Solar/Wind Harmer
1.721
232422X3-066 FULL
Solar/Wind Harmer
0.062
233964AF2-378 GEN
Solar/Wind Harmer
0
232426Y1-080 FULL
Solar/Wind Harmer
0
232434Z2-077 GEN
Solar/Wind Harmer
0.028
232901NORTHST
Adder
4.969
219904AC1-010 C
Solar/Wind Helper
0.029
231908HR1
50/50
2.274
232416X2-083
50/50
0.558
232424Y1-079 C
Solar/Wind Harmer
0
971747AH1-380 GEN
Solar/Wind Harmer
1.676
972069AH1-584 GEN
Solar/Wind Harmer
4.184
233970AC1-092 C
Solar/Wind Harmer
0.001
231915DC CT6
50/50
0.514
234015AF2-250 C
Solar/Wind Harmer
0
232921TASLEY2G
Adder
3.467
233990AG1-397 GEN
Solar/Wind Harmer
0.911
231505HR4
50/50
4.907
231902DC CT7
50/50
9.74
233955AB2-172 GEN
Solar/Wind Harmer
0.002
232912OH NUG1
Adder
5.932
233990AG1-397 GEN
Solar/Wind Harmer
-0.107
232813VAUGHN
Adder
0.386
231917EM10
50/50
3.908
233915AB1-141 GEN
Solar/Wind Harmer
0.191
970277AG2-181 GEN
Solar/Wind Harmer
0.403
232919VN10
Adder
1.931
232428Y3-058 C
Solar/Wind Harmer
0.001
233998TM1NIN_3.36
Solar/Wind Harmer
0.001
971195AH1-057 GEN
Solar/Wind Harmer
0.42
232404W1-003 C
Solar/Wind Harmer
0.435
232910NRG_G1
Adder
5.695
233950AC2-186 GEN
Solar/Wind Harmer
0
232900DEMECSMY
Adder
5.519
233972AC1-094 C
Solar/Wind Harmer
0.18
231900EM5
50/50
11.496
231909HR2
50/50
2.225
231131BLOOM ENRGY
50/50
3.899
233987AB2-037 GEN
Solar/Wind Harmer
0.008
234014AF1-036_GEN
Solar/Wind Harmer
1.721
234036AF2-325 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Harmer
0.001
232905CHERITON_25
Adder
1.648
232918OH NUG7
Adder
5.893
972071AH1-585 GEN
Solar/Wind Harmer
4.184
231910HR3
50/50
2.274
970431AG2-281 GEN
50/50
7.795
233933AB2-153 GEN
Solar/Wind Harmer
0.001
233984AB2-036 GEN
Solar/Wind Harmer
5.356
233944AB2-135 GEN
Solar/Wind Harmer
0.003
233946AB2-136 GEN
Solar/Wind Harmer
0.003
232408W1-005 C
Solar/Wind Harmer
0.435
232410W1-006 C
Solar/Wind Harmer
0.435
970545AG2-347 GEN
Solar/Wind Harmer
16.522
232899W1-062
Adder
5.754
233939AC1-091 C
Solar/Wind Harmer
0.001
233918AB1-142 GEN
Solar/Wind Harmer
0.191
232417X3-008 C
Solar/Wind Harmer
0.001
232907VN8
Adder
20.783
960671AF2-358 GEN
Solar/Wind Harmer
8.627
233994AC2-023 GEN
Solar/Wind Harmer
0.003
233997TMININ_4.2
Solar/Wind Harmer
0.001
233971AC1-093 C
Solar/Wind Harmer
0.025
970695AG2-447 GEN
Solar/Wind Harmer
1.429
231916EM3
50/50
1.531
231906DC3 NUG
50/50
12.183
231907DC10
50/50
3.042
233935AB2-179 C
Solar/Wind Harmer
1.084
971983AH1-536 GEN
Solar/Wind Harmer
1.319
970597AG2-380 GEN
Solar/Wind Harmer
3.082
232436AB1-176 C
Solar/Wind Harmer
0
233923SMA
Solar/Wind Harmer
0.003
232913OH NUG2
Adder
5.853
232920IR10
Adder
2.073
233973AC2-185 C
Solar/Wind Harmer
0.001
219914AD2-027 C
Solar/Wind Helper
0.056
233982AB2-133 GEN
Solar/Wind Harmer
0.003
233940AF2-379 C
Solar/Wind Harmer
0
232914OH NUG3
Adder
5.932
232916OH NUG5
Adder
5.932
233952AC2-187 GEN
Solar/Wind Harmer
0.001
233930AB2-032 GEN
Solar/Wind Harmer
0.715
965821AG1-450 GEN
Solar/Wind Harmer
3.594
232917OH NUG6
Adder
5.906
232915OH NUG4
Adder
5.893
233954AC2-188 GEN
Solar/Wind Harmer
0.001
972177AH1-672 GEN
Solar/Wind Harmer
6.55
219258KINSLEYDEP C
Solar/Wind Helper
0.038
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.126
NYPJM->LTFIMP_NY
CLTF
0.863
TVALTFEXP_TVA->PJM
CLTF
0.037
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.214
CPLELTFEXP_CPLE->PJM
CLTF
0.094
SIGELTFEXP_SIGE->PJM
CLTF
0.001
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.369
LGEELTFEXP_LGEE->PJM
CLTF
0.013
MECLTFEXP_MEC->PJM
CLTF
0.031
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.127
WECLTFEXP_WEC->PJM
CLTF
0.005
LAGNLTFEXP_LAGN->PJM
CLTF
0.072

Details for EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line l/o DPL_P1_2_CKT 23015_SRT-A


Base Case Flowgate

Area:DP&L/PECO
Facility Description:
EDGEMR 5-LINWOOD85 230.0 kV Ckt 1 line
Contingency Name:
DPL_P1_2_CKT 23015_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:112.3 %
Rating:809.0 MVA
Rating Type:B
MVA to Mitigate:908.48
MW Contribution:6.99
Bus #Bus NameTypeMW Contribution
234041AC1-190 GEN
Solar/Wind Harmer
4.653
232926CRISFLD1
Adder
1.213
231940T-011
Adder
0.453
971149AH1-027 GEN
Solar/Wind Harmer
1.707
233996TM1833_GEN
Solar/Wind Harmer
0.001
233900O-025 C
Adder
0.726
232406W1-004 FULL
Solar/Wind Harmer
0.399
972073AH1-586 GEN
Solar/Wind Harmer
5.75
972133AH1-634 GEN
Solar/Wind Harmer
2.21
231901EM4
50/50
2.507
231919CHRIST1
50/50
5.438
231920CHRIST2
50/50
5.317
233968AD2-076_GEN
Solar/Wind Harmer
1.556
232432Z2-076 GEN
Solar/Wind Harmer
0.008
234033AF1-007_GEN
Solar/Wind Harmer
-0.001
232904IR4
Adder
48.468
231918WEST 1
50/50
3.516
234012AE2-112_GEN
Solar/Wind Harmer
1.556
232422X3-066 FULL
Solar/Wind Harmer
0.056
233964AF2-378 GEN
Solar/Wind Harmer
0
232426Y1-080 FULL
Solar/Wind Harmer
0
232434Z2-077 GEN
Solar/Wind Harmer
0.025
232901NORTHST
Adder
4.546
231908HR1
50/50
1.803
232416X2-083
50/50
0.491
232424Y1-079 C
Solar/Wind Harmer
0
971747AH1-380 GEN
Solar/Wind Harmer
1.535
972069AH1-584 GEN
Solar/Wind Harmer
3.833
233970AC1-092 C
Solar/Wind Harmer
0.001
231915DC CT6
50/50
0.445
234015AF2-250 C
Solar/Wind Harmer
0
232921TASLEY2G
Adder
3.177
233990AG1-397 GEN
Solar/Wind Harmer
0.835
231505HR4
50/50
4.938
231902DC CT7
50/50
8.428
233955AB2-172 GEN
Solar/Wind Harmer
0.002
232912OH NUG1
Adder
5.435
233990AG1-397 GEN
Solar/Wind Harmer
-0.098
232813VAUGHN
Adder
0.351
231917EM10
50/50
2.416
233915AB1-141 GEN
Solar/Wind Harmer
0.172
970277AG2-181 GEN
Solar/Wind Harmer
0.369
232919VN10
Adder
1.769
232428Y3-058 C
Solar/Wind Harmer
0.001
233998TM1NIN_3.36
Solar/Wind Harmer
0.001
971195AH1-057 GEN
Solar/Wind Harmer
0.385
232404W1-003 C
Solar/Wind Harmer
0.399
232910NRG_G1
Adder
5.168
233950AC2-186 GEN
Solar/Wind Harmer
0
232900DEMECSMY
Adder
5.036
233972AC1-094 C
Solar/Wind Harmer
0.164
231900EM5
50/50
11.57
231909HR2
50/50
1.376
231131BLOOM ENRGY
50/50
3.358
233987AB2-037 GEN
Solar/Wind Harmer
0.007
234014AF1-036_GEN
Solar/Wind Harmer
1.556
234036AF2-325 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Harmer
0.001
232905CHERITON_25
Adder
1.51
232918OH NUG7
Adder
5.399
972071AH1-585 GEN
Solar/Wind Harmer
3.833
231910HR3
50/50
1.803
970431AG2-281 GEN
50/50
6.99
233933AB2-153 GEN
Solar/Wind Harmer
0.001
233984AB2-036 GEN
Solar/Wind Harmer
4.868
233944AB2-135 GEN
Solar/Wind Harmer
0.003
233946AB2-136 GEN
Solar/Wind Harmer
0.003
232408W1-005 C
Solar/Wind Harmer
0.399
232410W1-006 C
Solar/Wind Harmer
0.399
970545AG2-347 GEN
Solar/Wind Harmer
15.133
232899W1-062
Adder
5.25
233939AC1-091 C
Solar/Wind Harmer
0.001
233918AB1-142 GEN
Solar/Wind Harmer
0.172
232417X3-008 C
Solar/Wind Harmer
0.001
232907VN8
Adder
19.054
960671AF2-358 GEN
Solar/Wind Harmer
7.9
233994AC2-023 GEN
Solar/Wind Harmer
0.003
233997TMININ_4.2
Solar/Wind Harmer
0.001
233971AC1-093 C
Solar/Wind Harmer
0.022
970695AG2-447 GEN
Solar/Wind Harmer
1.306
233982AB2-133 GEN
Solar/Wind Harmer
0.003
233940AF2-379 C
Solar/Wind Harmer
0
232914OH NUG3
Adder
5.435
232916OH NUG5
Adder
5.435
233952AC2-187 GEN
Solar/Wind Harmer
0.001
233930AB2-032 GEN
Solar/Wind Harmer
0.643
965821AG1-450 GEN
Solar/Wind Harmer
3.292
232917OH NUG6
Adder
5.411
232915OH NUG4
Adder
5.399
233954AC2-188 GEN
Solar/Wind Harmer
0.001
972177AH1-672 GEN
Solar/Wind Harmer
5.993
231916EM3
50/50
0.947
231906DC3 NUG
50/50
10.543
231907DC10
50/50
2.632
233935AB2-179 C
Solar/Wind Harmer
0.954
971983AH1-536 GEN
Solar/Wind Harmer
1.187
970597AG2-380 GEN
Solar/Wind Harmer
2.787
232436AB1-176 C
Solar/Wind Harmer
0
233923SMA
Solar/Wind Harmer
0.003
232913OH NUG2
Adder
5.363
232920IR10
Adder
1.899
233973AC2-185 C
Solar/Wind Harmer
0.001
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.207
NYPJM->LTFIMP_NY
CLTF
0.787
TVALTFEXP_TVA->PJM
CLTF
0.04
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.215
CPLELTFEXP_CPLE->PJM
CLTF
0.093
SIGELTFEXP_SIGE->PJM
CLTF
0.001
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.421
LGEELTFEXP_LGEE->PJM
CLTF
0.016
MECLTFEXP_MEC->PJM
CLTF
0.039
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.14
WECLTFEXP_WEC->PJM
CLTF
0.007
LAGNLTFEXP_LAGN->PJM
CLTF
0.078

Details for NMEREDTH-KENT 69.0 kV Ckt 1 line l/o DPL_P4_2_DPCEDAR231_SRT-A


Base Case Flowgate

Area:DP&L
Facility Description:
NMEREDTH-KENT 69.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_DPCEDAR231_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.52 %
Rating:93.0 MVA
Rating Type:B
MVA to Mitigate:97.2
MW Contribution:5.34
Bus #Bus NameTypeMW Contribution
233968AD2-076_GEN
Solar/Wind Harmer
2.197
232432Z2-076 GEN
Solar/Wind Helper
0.035
234033AF1-007_GEN
Solar/Wind Helper
3.666
232422X3-066 FULL
Solar/Wind Harmer
0.136
234012AE2-112_GEN
Solar/Wind Harmer
0.762
232434Z2-077 GEN
Solar/Wind Helper
0.067
232424Y1-079 C
Solar/Wind Harmer
0.146
233970AC1-092 C
Solar/Wind Helper
0.458
234015AF2-250 C
Solar/Wind Helper
0.018
233990AG1-397 GEN
Solar/Wind Helper
0.014
233915AB1-141 GEN
Solar/Wind Harmer
0.431
233950AC2-186 GEN
Solar/Wind Helper
0.207
233972AC1-094 C
Solar/Wind Helper
0.396
234014AF1-036_GEN
Solar/Wind Harmer
0.897
970431AG2-281 GEN
50/50
5.339
233944AB2-135 GEN
Solar/Wind Harmer
6.269
233933AB2-153 GEN
Solar/Wind Harmer
0.49
233939AC1-091 C
Solar/Wind Helper
0.458
233918AB1-142 GEN
Solar/Wind Harmer
0.431
233971AC1-093 C
Solar/Wind Helper
0.468
233982AB2-133 GEN
Solar/Wind Harmer
3.909
233952AC2-187 GEN
Solar/Wind Helper
0.414
232436AB1-176 C
Solar/Wind Harmer
0.125
971983AH1-536 GEN
Solar/Wind Harmer
3.174
970597AG2-380 GEN
Solar/Wind Harmer
1.379
233935AB2-179 C
Solar/Wind Harmer
0.773
233930AB2-032 GEN
Solar/Wind Harmer
0.363
233954AC2-188 GEN
Solar/Wind Helper
0.414
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.035
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.049
CPLELTFEXP_CPLE->PJM
CLTF
0.018
SIGELTFEXP_SIGE->PJM
CLTF
0.001
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.06
WECLTFEXP_WEC->PJM
CLTF
0.006
LAGNLTFEXP_LAGN->PJM
CLTF
0.032
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.228
VTFLTFEXP_VFT->PJM
CMTX
0.008
TVALTFEXP_TVA->PJM
CLTF
0.016
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.212
LGEELTFEXP_LGEE->PJM
CLTF
0.011
MECLTFEXP_MEC->PJM
CLTF
0.026

Details for NMEREDTH-KENT 69.0 kV Ckt 1 line l/o DPL_P4_2_DP11_SRT-A


Base Case Flowgate

Area:DP&L
Facility Description:
NMEREDTH-KENT 69.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_DP11_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.93 %
Rating:93.0 MVA
Rating Type:B
MVA to Mitigate:96.66
MW Contribution:7.15
Bus #Bus NameTypeMW Contribution
232406W1-004 FULL
Solar/Wind Helper
0.255
233996TM1833_GEN
Solar/Wind Helper
0.13
233968AD2-076_GEN
Solar/Wind Harmer
3.537
232432Z2-076 GEN
Solar/Wind Helper
0.036
234033AF1-007_GEN
Solar/Wind Helper
3.694
232422X3-066 FULL
Solar/Wind Harmer
0.185
234012AE2-112_GEN
Solar/Wind Harmer
1.227
232434Z2-077 GEN
Solar/Wind Helper
0.068
232424Y1-079 C
Solar/Wind Harmer
0.264
233970AC1-092 C
Solar/Wind Helper
0.2
234015AF2-250 C
Solar/Wind Helper
0.02
233990AG1-397 GEN
Solar/Wind Helper
0.016
233915AB1-141 GEN
Solar/Wind Harmer
0.616
233950AC2-186 GEN
Solar/Wind Helper
0.182
233972AC1-094 C
Solar/Wind Helper
0.173
232404W1-003 C
Solar/Wind Helper
0.255
233998TM1NIN_3.36
Solar/Wind Helper
0.13
232428Y3-058 C
Solar/Wind Helper
0.162
234014AF1-036_GEN
Solar/Wind Harmer
1.444
233901CHERRYDALE C
Solar/Wind Helper
0.117
970431AG2-281 GEN
50/50
7.147
233944AB2-135 GEN
Solar/Wind Harmer
7.22
233933AB2-153 GEN
Solar/Wind Harmer
0.699
233918AB1-142 GEN
Solar/Wind Harmer
0.616
233971AC1-093 C
Solar/Wind Helper
0.204
233997TMININ_4.2
Solar/Wind Helper
0.13
233984AB2-036 GEN
Solar/Wind Harmer
5.359
233939AC1-091 C
Solar/Wind Helper
0.2
232408W1-005 C
Solar/Wind Helper
0.255
232410W1-006 C
Solar/Wind Helper
0.255
233982AB2-133 GEN
Solar/Wind Harmer
4.778
233952AC2-187 GEN
Solar/Wind Helper
0.364
233940AF2-379 C
Solar/Wind Helper
0.031
232436AB1-176 C
Solar/Wind Harmer
0.169
971983AH1-536 GEN
Solar/Wind Harmer
4.587
970597AG2-380 GEN
Solar/Wind Harmer
2.221
233935AB2-179 C
Solar/Wind Harmer
1.041
233923SMA
Solar/Wind Helper
0.477
233930AB2-032 GEN
Solar/Wind Harmer
0.518
233954AC2-188 GEN
Solar/Wind Helper
0.364
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.047
CPLELTFEXP_CPLE->PJM
CLTF
0.017
SIGELTFEXP_SIGE->PJM
CLTF
0.001
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.057
WECLTFEXP_WEC->PJM
CLTF
0.006
LAGNLTFEXP_LAGN->PJM
CLTF
0.03
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.21
NYPJM->LTFIMP_NY
CLTF
0.012
TVALTFEXP_TVA->PJM
CLTF
0.015
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.199
LGEELTFEXP_LGEE->PJM
CLTF
0.01
MECLTFEXP_MEC->PJM
CLTF
0.024

Details for NMEREDTH-KENT 69.0 kV Ckt 1 line l/o DPL_P4_2_DP25B_SRT-A


Base Case Flowgate

Area:DP&L
Facility Description:
NMEREDTH-KENT 69.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_DP25B_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.33 %
Rating:93.0 MVA
Rating Type:B
MVA to Mitigate:96.1
MW Contribution:5.16
Bus #Bus NameTypeMW Contribution
233968AD2-076_GEN
Solar/Wind Harmer
2.201
232422X3-066 FULL
Solar/Wind Harmer
0.132
234012AE2-112_GEN
Solar/Wind Harmer
0.764
232424Y1-079 C
Solar/Wind Harmer
0.15
233915AB1-141 GEN
Solar/Wind Harmer
0.422
233950AC2-186 GEN
Solar/Wind Helper
0.229
234014AF1-036_GEN
Solar/Wind Harmer
0.898
233918AB1-142 GEN
Solar/Wind Harmer
0.422
970431AG2-281 GEN
50/50
5.155
233944AB2-135 GEN
Solar/Wind Harmer
5.9
233933AB2-153 GEN
Solar/Wind Harmer
0.479
232436AB1-176 C
Solar/Wind Harmer
0.121
971983AH1-536 GEN
Solar/Wind Harmer
3.108
970597AG2-380 GEN
Solar/Wind Harmer
1.382
233935AB2-179 C
Solar/Wind Harmer
0.747
233982AB2-133 GEN
Solar/Wind Harmer
3.715
233952AC2-187 GEN
Solar/Wind Helper
0.459
233930AB2-032 GEN
Solar/Wind Harmer
0.355
233954AC2-188 GEN
Solar/Wind Helper
0.459
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.036
CPLELTFEXP_CPLE->PJM
CLTF
0.013
SIGELTFEXP_SIGE->PJM
CLTF
0.001
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.045
WECLTFEXP_WEC->PJM
CLTF
0.004
LAGNLTFEXP_LAGN->PJM
CLTF
0.024
CBM West 1LTFEXP_CBM-W1->PJM
CBM
0.168
NYPJM->LTFIMP_NY
CLTF
0
TVALTFEXP_TVA->PJM
CLTF
0.012
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.157
LGEELTFEXP_LGEE->PJM
CLTF
0.008
MECLTFEXP_MEC->PJM
CLTF
0.019
CONTINGENCY 'PECO_P1-2_220-85_SRT-A
 DISCONNECT BUS 214236   /*LINWOOD85    230.0
END
CONTINGENCY 'DPL_P4_2_DPEM234_SRT-A'
 DISCONNECT BRANCH FROM BUS 231001 TO BUS 214236 CKT 1   /*EDGEMR 5     230.0 - LINWOOD85    230.0
 DISCONNECT BUS 231900                                   /*EM5           23.0
END
CONTINGENCY 'DPL_P4_2_DPEM231_SRT-A'
 DISCONNECT BRANCH FROM BUS 231000 TO BUS 231001 CKT 1   /*CLAY_230     230.0 - EDGEMR 5     230.0
 DISCONNECT BRANCH FROM BUS 231001 TO BUS 231109 CKT 1   /*EDGEMR 5     230.0 - EDGEMR 4     138.0
END
CONTINGENCY 'PECO_P4_LINWO115_SRT-A
 DISCONNECT BUS 214216   /*POST97       230.0
 DISCONNECT BUS 214234   /*LINWOOD97    230.0
 DISCONNECT BUS 214235   /*LINWOOD84    230.0
END
CONTINGENCY 'DPL_P4_2_DPEM237_SRT-A'
 DISCONNECT BRANCH FROM BUS 231001 TO BUS 231000 CKT 1   /*EDGEMR 5     230.0 - CLAY_230     230.0
 DISCONNECT BUS 231505                                   /*HR4           18.0
END
CONTINGENCY 'PECO_P1-2_220-84_SRT-A
 DISCONNECT BUS 214235   /*LINWOOD84    230.0
END
CONTINGENCY 'DPL_P1_2_CKT 23015_SRT-A'
 OPEN LINE FROM BUS 231000 TO BUS 231001 CIRCUIT 1   /*CLAY_230     230.0 - EDGEMR 5     230.0
END
CONTINGENCY 'DPL_P4_2_DPCEDAR231_SRT-A'
 DISCONNECT BRANCH FROM BUS 232002 TO BUS 232013 CKT 1   /*CEDAR CK     230.0 - SILVER RUN   230.0
 REMOVE SWSHUNT FROM BUS 232002                          /*CEDAR CK     230.0
END
CONTINGENCY 'DPL_P4_2_DP11_SRT-A'
 DISCONNECT BRANCH FROM BUS 232000 TO BUS 232005 CKT 1   /*STEELE       230.0 - VIENNA       230.0
 DISCONNECT BRANCH FROM BUS 232004 TO BUS 232000 CKT 1   /*MILF_230     230.0 - STEELE       230.0
END
CONTINGENCY 'DPL_P4_2_DP25B_SRT-A'
 DISCONNECT BRANCH FROM BUS 232002 TO BUS 232108 CKT 1   /*CEDAR CK     230.0 - CEDAR138     138.0
 DISCONNECT BUS 233939                                   /*AC1-091 C    138.0
 DISCONNECT BUS 233970                                   /*AC1-092 C    138.0
 DISCONNECT BUS 233971                                   /*AC1-093 C    138.0
 DISCONNECT BUS 233972                                   /*AC1-094 C    138.0
 DISCONNECT BUS 233973                                   /*AC2-185 C    138.0
END
231000 to 214235 ckt 1
231001 to 231000 ckt 1
231001 to 214236 ckt 1
232812 to 232215 ckt 1

Winter Peak Analysis

The New Service Request AG2-281 was evaluated as a 50.0 MW (50.0 MW Capacity) injection in the DPL area.

AG2-281 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 50.0 MW (50.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2BGE/PECO
COOPER-GRACETON 230.0 kV Ckt 1 line
PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L
SingleAC103.86 %639.0B663.674.75
GD2PECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L
SingleAC110.18 %639.0B704.064.75
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC105.12 %639.0B671.74.28
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC105.07 %639.0B671.374.28
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC105.04 %639.0B671.194.28
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC105.04 %639.0B671.194.28
GD2PECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L
SingleAC110.18 %639.0B704.064.75
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC105.12 %639.0B671.74.28
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC105.07 %639.0B671.374.28
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC105.04 %639.0B671.194.28
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC105.04 %639.0B671.194.28
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P1-2_PE-500-3835T_SRT-A
SingleAC118.35 %3700.0B4378.7817.25
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P2-3_PE-500-019E_SRT-W
BreakerAC118.31 %3700.0B4377.5217.25
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P2-3_PE-500-019B_SRT-A
BreakerAC114.26 %3700.0B4227.7316.27
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
PECO_P1-2_5007_SRT-A/* $ CHESCO $ PECO_P1-2_5007 $ L
SingleAC109.47 %3700.0B4050.4918.59
GD2PECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L
SingleAC107.87 %639.0B689.324.75
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC102.85 %639.0B657.214.28
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC102.81 %639.0B656.964.28
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC102.78 %639.0B656.784.28
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC102.78 %639.0B656.784.28

Details for COOPER-GRACETON 230.0 kV Ckt 1 line l/o PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L


Base Case Flowgate

Area:BGE/PECO
Facility Description:
COOPER-GRACETON 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:103.86 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:663.67
MW Contribution:4.75
Bus #Bus NameTypeMW Contribution
213508CON10-11
50/50
0.988
213508CON10-11
50/50
0.988
213514CONOW1-2
50/50
0.737
213514CONOW1-2
50/50
0.776
213515CONOW3-4
50/50
1.038
213515CONOW3-4
50/50
0.946
213516CONOW5-6
50/50
0.776
213516CONOW5-6
50/50
0.946
213517CONOW7
50/50
1.038
213518CONOW8-9
50/50
0.988
213518CONOW8-9
50/50
0.988
214067T20SOLAR
Solar/Wind Harmer
0
231131BLOOM ENRGY
50/50
0.122
231505HR4
50/50
0.951
231901EM4
50/50
0.877
231907DC10
50/50
0.115
231908HR1
50/50
0.629
231909HR2
50/50
0.632
231910HR3
50/50
0.629
231916EM3
50/50
0.435
231917EM10
50/50
0.092
231918WEST 1
50/50
0.104
231919CHRIST1
50/50
2.482
231920CHRIST2
50/50
2.482
232416X2-083
50/50
0.015
232426Y1-080 FULL
Solar/Wind Harmer
0
218660EHAMPSOLAR C
Solar/Wind Harmer
0
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219276PARKLANDSO C
Solar/Wind Harmer
0
219615MILLCREEK C
Solar/Wind Harmer
0
219766PARADISE C
Solar/Wind Harmer
0
223402AF1-300 C
Solar/Wind Helper
0.053
208923BUSO V4-027
Solar/Wind Helper
0.013
233940AF2-379 C
Solar/Wind Harmer
0
233972AC1-094 C
Solar/Wind Harmer
0
219727YARDVSOLFA C
Solar/Wind Harmer
0
219907AC1-030 C
Solar/Wind Harmer
0
228754AB1-001 C
Solar/Wind Harmer
0
230422AE1-104_GEN1
Solar/Wind Harmer
13.092
230425AE1-104_GEN2
Solar/Wind Harmer
13.092
228351V2-046C
Solar/Wind Harmer
0
967451AG2-055 C O1
Solar/Wind Harmer
50.18
233946AB2-136 GEN
Solar/Wind Harmer
0
234033AF1-007_GEN
Solar/Wind Harmer
8.724
233987AB2-037 GEN
Solar/Wind Harmer
0
233968AD2-076_GEN
Solar/Wind Harmer
0.224
234012AE2-112_GEN
Solar/Wind Harmer
0.078
234014AF1-036_GEN
Solar/Wind Harmer
0.092
234015AF2-250 C
Solar/Wind Harmer
0
233990AG1-397 GEN
Solar/Wind Harmer
0.672
233990AG1-397 GEN
Solar/Wind Harmer
0
207522AF2-254 C
Solar/Wind Harmer
0.027
207500AE2-000G1
Solar/Wind Harmer
10.314
207497AE2-000G2
Solar/Wind Harmer
10.314
207507AE2-000G3
Solar/Wind Harmer
10.314
207487AE2-000G4
Solar/Wind Harmer
10.314
233923SMA
Solar/Wind Harmer
0
230433AD2-135 GEN
Solar/Wind Harmer
0
230430AE1-229_GEN
Solar/Wind Harmer
0
219906AC1-017 C
Solar/Wind Harmer
0
219623KINSLEYBEA C
Solar/Wind Harmer
0
219258KINSLEYDEP C
Solar/Wind Harmer
0
231902DC CT7
50/50
0.443
231906DC3 NUG
50/50
0.355
231915DC CT6
50/50
0.443
233964AF2-378 GEN
Solar/Wind Harmer
0
223401AF1-299 GEN
Solar/Wind Helper
0.053
230407AD2-065 C
Solar/Wind Harmer
0
233996TM1833_GEN
Solar/Wind Harmer
0
233997TMININ_4.2
Solar/Wind Harmer
0
233998TM1NIN_3.36
Solar/Wind Harmer
0
945431AF1-208 GEN
Solar/Wind Harmer
0.146
960671AF2-358 GEN
Solar/Wind Harmer
0.425
970025AG2-016 GEN
Solar/Wind Harmer
0.052
970277AG2-181 GEN
Solar/Wind Harmer
0.119
970453AG2-297 GEN
Solar/Wind Harmer
0.061
970545AG2-347 GEN
Solar/Wind Harmer
35.936
970597AG2-380 GEN
Solar/Wind Harmer
1.831
970695AG2-447 GEN
Solar/Wind Harmer
0.081
970997AG2-616 GEN
Solar/Wind Harmer
0.162
971011AG2-627 GEN
Solar/Wind Harmer
0.13
971149AH1-027 GEN
Solar/Wind Harmer
0.102
971189AH1-054 GEN
Solar/Wind Harmer
0.021
971195AH1-057 GEN
Solar/Wind Harmer
0.03
971535AH1-265 GEN
Solar/Wind Harmer
0.094
971553AH1-274 GEN
Solar/Wind Harmer
0.054
971667AH1-334 GEN
Solar/Wind Harmer
0.049
965821AG1-450 GEN
Solar/Wind Harmer
2.125
971747AH1-380 GEN
Solar/Wind Harmer
0.084
971983AH1-536 GEN
Solar/Wind Harmer
0.195
972069AH1-584 GEN
Solar/Wind Harmer
0.21
972071AH1-585 GEN
Solar/Wind Harmer
0.21
972073AH1-586 GEN
Solar/Wind Harmer
3.778
972133AH1-634 GEN
Solar/Wind Harmer
5.445
972141AH1-641 GEN
Solar/Wind Harmer
0.049
972177AH1-672 GEN
Solar/Wind Harmer
0.312
970431AG2-281 GEN
50/50
4.747
233984AB2-036 GEN
Solar/Wind Harmer
0.412
234041AC1-190 GEN
Solar/Wind Harmer
0.214
CBM NorthLTFEXP_CBM-N->PJM
CBM
12.425
G-007ALTFEXP_G-007A->PJM
CMTX
10.511
VFTLTFEXP_VFT->PJM
CMTX
25.801
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.959
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.567
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
3.752
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.798
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.487
MDUPJM->LTFIMP_MDU
CLTF
0

Details for NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L


Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:110.18 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:704.06
MW Contribution:4.75
Bus #Bus NameTypeMW Contribution
213508CON10-11
50/50
0.988
213508CON10-11
50/50
0.988
213514CONOW1-2
50/50
0.737
213514CONOW1-2
50/50
0.776
213515CONOW3-4
50/50
1.038
213515CONOW3-4
50/50
0.946
213516CONOW5-6
50/50
0.776
213516CONOW5-6
50/50
0.946
213517CONOW7
50/50
1.038
213518CONOW8-9
50/50
0.988
213518CONOW8-9
50/50
0.988
214067T20SOLAR
Solar/Wind Harmer
0
231131BLOOM ENRGY
50/50
0.122
231505HR4
50/50
0.951
231901EM4
50/50
0.877
231907DC10
50/50
0.115
231908HR1
50/50
0.629
231909HR2
50/50
0.632
231910HR3
50/50
0.629
231916EM3
50/50
0.435
231917EM10
50/50
0.092
231918WEST 1
50/50
0.104
231919CHRIST1
50/50
2.482
231920CHRIST2
50/50
2.482
232416X2-083
50/50
0.015
232426Y1-080 FULL
Solar/Wind Harmer
0
218660EHAMPSOLAR C
Solar/Wind Harmer
0
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219276PARKLANDSO C
Solar/Wind Harmer
0
219615MILLCREEK C
Solar/Wind Harmer
0
219766PARADISE C
Solar/Wind Harmer
0
223402AF1-300 C
Solar/Wind Helper
0.053
208923BUSO V4-027
Solar/Wind Helper
0.013
233940AF2-379 C
Solar/Wind Harmer
0
233972AC1-094 C
Solar/Wind Harmer
0
219727YARDVSOLFA C
Solar/Wind Harmer
0
219907AC1-030 C
Solar/Wind Harmer
0
228754AB1-001 C
Solar/Wind Harmer
0
230422AE1-104_GEN1
Solar/Wind Harmer
13.092
230425AE1-104_GEN2
Solar/Wind Harmer
13.092
228351V2-046C
Solar/Wind Harmer
0
967451AG2-055 C O1
Solar/Wind Harmer
50.18
233946AB2-136 GEN
Solar/Wind Harmer
0
234033AF1-007_GEN
Solar/Wind Harmer
8.724
233987AB2-037 GEN
Solar/Wind Harmer
0
233968AD2-076_GEN
Solar/Wind Harmer
0.224
234012AE2-112_GEN
Solar/Wind Harmer
0.078
234014AF1-036_GEN
Solar/Wind Harmer
0.092
234015AF2-250 C
Solar/Wind Harmer
0
233990AG1-397 GEN
Solar/Wind Harmer
0.672
233990AG1-397 GEN
Solar/Wind Harmer
0
207522AF2-254 C
Solar/Wind Harmer
0.027
207500AE2-000G1
Solar/Wind Harmer
10.314
207497AE2-000G2
Solar/Wind Harmer
10.314
207507AE2-000G3
Solar/Wind Harmer
10.314
207487AE2-000G4
Solar/Wind Harmer
10.314
233923SMA
Solar/Wind Harmer
0
230433AD2-135 GEN
Solar/Wind Harmer
0
230430AE1-229_GEN
Solar/Wind Harmer
0
219906AC1-017 C
Solar/Wind Harmer
0
219623KINSLEYBEA C
Solar/Wind Harmer
0
219258KINSLEYDEP C
Solar/Wind Harmer
0
231902DC CT7
50/50
0.443
231906DC3 NUG
50/50
0.355
231915DC CT6
50/50
0.443
233964AF2-378 GEN
Solar/Wind Harmer
0
223401AF1-299 GEN
Solar/Wind Helper
0.053
230407AD2-065 C
Solar/Wind Harmer
0
233996TM1833_GEN
Solar/Wind Harmer
0
233997TMININ_4.2
Solar/Wind Harmer
0
233998TM1NIN_3.36
Solar/Wind Harmer
0
945431AF1-208 GEN
Solar/Wind Harmer
0.146
960671AF2-358 GEN
Solar/Wind Harmer
0.425
970025AG2-016 GEN
Solar/Wind Harmer
0.052
970277AG2-181 GEN
Solar/Wind Harmer
0.119
970453AG2-297 GEN
Solar/Wind Harmer
0.061
970545AG2-347 GEN
Solar/Wind Harmer
35.936
970597AG2-380 GEN
Solar/Wind Harmer
1.831
970695AG2-447 GEN
Solar/Wind Harmer
0.081
970997AG2-616 GEN
Solar/Wind Harmer
0.162
971011AG2-627 GEN
Solar/Wind Harmer
0.13
971149AH1-027 GEN
Solar/Wind Harmer
0.102
971189AH1-054 GEN
Solar/Wind Harmer
0.021
971195AH1-057 GEN
Solar/Wind Harmer
0.03
971535AH1-265 GEN
Solar/Wind Harmer
0.094
971553AH1-274 GEN
Solar/Wind Harmer
0.054
971667AH1-334 GEN
Solar/Wind Harmer
0.049
965821AG1-450 GEN
Solar/Wind Harmer
2.125
971747AH1-380 GEN
Solar/Wind Harmer
0.084
971983AH1-536 GEN
Solar/Wind Harmer
0.195
972069AH1-584 GEN
Solar/Wind Harmer
0.21
972071AH1-585 GEN
Solar/Wind Harmer
0.21
972073AH1-586 GEN
Solar/Wind Harmer
3.778
972133AH1-634 GEN
Solar/Wind Harmer
5.445
972141AH1-641 GEN
Solar/Wind Harmer
0.049
972177AH1-672 GEN
Solar/Wind Harmer
0.312
970431AG2-281 GEN
50/50
4.747
233984AB2-036 GEN
Solar/Wind Harmer
0.412
234041AC1-190 GEN
Solar/Wind Harmer
0.214
CBM NorthLTFEXP_CBM-N->PJM
CBM
12.425
G-007ALTFEXP_G-007A->PJM
CMTX
10.511
VFTLTFEXP_VFT->PJM
CMTX
25.801
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.959
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.567
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
3.752
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.798
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.487
MDUPJM->LTFIMP_MDU
CLTF
0

Details for [AG2-281] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.12 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:671.7
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.276

Details for [AG2-281] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.07 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:671.37
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.278

Details for [AG2-281] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:105.04 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:671.19
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.276

Details for [AG2-281] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.04 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:671.19
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.276

Details for NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L


Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:110.18 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:704.06
MW Contribution:4.75
Bus #Bus NameTypeMW Contribution
213508CON10-11
50/50
0.988
213508CON10-11
50/50
0.988
213514CONOW1-2
50/50
0.737
213514CONOW1-2
50/50
0.776
213515CONOW3-4
50/50
1.038
213515CONOW3-4
50/50
0.946
213516CONOW5-6
50/50
0.776
213516CONOW5-6
50/50
0.946
213517CONOW7
50/50
1.038
213518CONOW8-9
50/50
0.988
213518CONOW8-9
50/50
0.988
214067T20SOLAR
Solar/Wind Harmer
0
231131BLOOM ENRGY
50/50
0.122
231505HR4
50/50
0.951
231901EM4
50/50
0.877
231907DC10
50/50
0.115
231908HR1
50/50
0.629
231909HR2
50/50
0.632
231910HR3
50/50
0.629
231916EM3
50/50
0.435
231917EM10
50/50
0.092
231918WEST 1
50/50
0.104
231919CHRIST1
50/50
2.482
231920CHRIST2
50/50
2.482
232416X2-083
50/50
0.015
232426Y1-080 FULL
Solar/Wind Harmer
0
218660EHAMPSOLAR C
Solar/Wind Harmer
0
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219276PARKLANDSO C
Solar/Wind Harmer
0
219615MILLCREEK C
Solar/Wind Harmer
0
219766PARADISE C
Solar/Wind Harmer
0
223402AF1-300 C
Solar/Wind Helper
0.053
208923BUSO V4-027
Solar/Wind Helper
0.013
233940AF2-379 C
Solar/Wind Harmer
0
233972AC1-094 C
Solar/Wind Harmer
0
219727YARDVSOLFA C
Solar/Wind Harmer
0
219907AC1-030 C
Solar/Wind Harmer
0
228754AB1-001 C
Solar/Wind Harmer
0
230422AE1-104_GEN1
Solar/Wind Harmer
13.092
230425AE1-104_GEN2
Solar/Wind Harmer
13.092
228351V2-046C
Solar/Wind Harmer
0
967451AG2-055 C O1
Solar/Wind Harmer
50.18
233946AB2-136 GEN
Solar/Wind Harmer
0
234033AF1-007_GEN
Solar/Wind Harmer
8.724
233987AB2-037 GEN
Solar/Wind Harmer
0
233968AD2-076_GEN
Solar/Wind Harmer
0.224
234012AE2-112_GEN
Solar/Wind Harmer
0.078
234014AF1-036_GEN
Solar/Wind Harmer
0.092
234015AF2-250 C
Solar/Wind Harmer
0
233990AG1-397 GEN
Solar/Wind Harmer
0.672
233990AG1-397 GEN
Solar/Wind Harmer
0
207522AF2-254 C
Solar/Wind Harmer
0.027
207500AE2-000G1
Solar/Wind Harmer
10.314
207497AE2-000G2
Solar/Wind Harmer
10.314
207507AE2-000G3
Solar/Wind Harmer
10.314
207487AE2-000G4
Solar/Wind Harmer
10.314
233923SMA
Solar/Wind Harmer
0
230433AD2-135 GEN
Solar/Wind Harmer
0
230430AE1-229_GEN
Solar/Wind Harmer
0
219906AC1-017 C
Solar/Wind Harmer
0
219623KINSLEYBEA C
Solar/Wind Harmer
0
219258KINSLEYDEP C
Solar/Wind Harmer
0
231902DC CT7
50/50
0.443
231906DC3 NUG
50/50
0.355
231915DC CT6
50/50
0.443
233964AF2-378 GEN
Solar/Wind Harmer
0
223401AF1-299 GEN
Solar/Wind Helper
0.053
230407AD2-065 C
Solar/Wind Harmer
0
233996TM1833_GEN
Solar/Wind Harmer
0
233997TMININ_4.2
Solar/Wind Harmer
0
233998TM1NIN_3.36
Solar/Wind Harmer
0
945431AF1-208 GEN
Solar/Wind Harmer
0.146
960671AF2-358 GEN
Solar/Wind Harmer
0.425
970025AG2-016 GEN
Solar/Wind Harmer
0.052
970277AG2-181 GEN
Solar/Wind Harmer
0.119
970453AG2-297 GEN
Solar/Wind Harmer
0.061
970545AG2-347 GEN
Solar/Wind Harmer
35.936
970597AG2-380 GEN
Solar/Wind Harmer
1.831
970695AG2-447 GEN
Solar/Wind Harmer
0.081
970997AG2-616 GEN
Solar/Wind Harmer
0.162
971011AG2-627 GEN
Solar/Wind Harmer
0.13
971149AH1-027 GEN
Solar/Wind Harmer
0.102
971189AH1-054 GEN
Solar/Wind Harmer
0.021
971195AH1-057 GEN
Solar/Wind Harmer
0.03
971535AH1-265 GEN
Solar/Wind Harmer
0.094
971553AH1-274 GEN
Solar/Wind Harmer
0.054
971667AH1-334 GEN
Solar/Wind Harmer
0.049
965821AG1-450 GEN
Solar/Wind Harmer
2.125
971747AH1-380 GEN
Solar/Wind Harmer
0.084
971983AH1-536 GEN
Solar/Wind Harmer
0.195
972069AH1-584 GEN
Solar/Wind Harmer
0.21
972071AH1-585 GEN
Solar/Wind Harmer
0.21
972073AH1-586 GEN
Solar/Wind Harmer
3.778
972133AH1-634 GEN
Solar/Wind Harmer
5.445
972141AH1-641 GEN
Solar/Wind Harmer
0.049
972177AH1-672 GEN
Solar/Wind Harmer
0.312
970431AG2-281 GEN
50/50
4.747
233984AB2-036 GEN
Solar/Wind Harmer
0.412
234041AC1-190 GEN
Solar/Wind Harmer
0.214
CBM NorthLTFEXP_CBM-N->PJM
CBM
12.425
G-007ALTFEXP_G-007A->PJM
CMTX
10.511
VFTLTFEXP_VFT->PJM
CMTX
25.801
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.959
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.567
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
3.752
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.798
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.487
MDUPJM->LTFIMP_MDU
CLTF
0

Details for [AG2-281] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.12 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:671.7
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.276

Details for [AG2-281] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.07 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:671.37
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.278

Details for [AG2-281] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.04 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:671.19
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.276

Details for [AG2-281] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:105.04 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:671.19
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.276

Details for [AG2-281] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P1-2_PE-500-3835T_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-3835T_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:118.35 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4378.78
MW Contribution:17.25
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
17.249

Details for [AG2-281] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P2-3_PE-500-019E_SRT-W


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-019E_SRT-W
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:118.31 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4377.52
MW Contribution:17.25
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
17.254

Details for [AG2-281] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P2-3_PE-500-019B_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-019B_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:114.26 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4227.73
MW Contribution:16.27
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
16.268

Details for [AG2-281] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o PECO_P1-2_5007_SRT-A/* $ CHESCO $ PECO_P1-2_5007 $ L


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5007_SRT-A/* $ CHESCO $ PECO_P1-2_5007 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:109.47 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4050.49
MW Contribution:18.59
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
18.592

Details for PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L


Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5014_SRT-A/* $ CHESCO $ PECO_P1-2_5012 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.87 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:689.32
MW Contribution:4.75
Bus #Bus NameTypeMW Contribution
213508CON10-11
50/50
0.988
213508CON10-11
50/50
0.988
213514CONOW1-2
50/50
0.737
213514CONOW1-2
50/50
0.776
213515CONOW3-4
50/50
1.038
213515CONOW3-4
50/50
0.946
213516CONOW5-6
50/50
0.776
213516CONOW5-6
50/50
0.946
213517CONOW7
50/50
1.038
213518CONOW8-9
50/50
0.988
213518CONOW8-9
50/50
0.988
214067T20SOLAR
Solar/Wind Harmer
0
231131BLOOM ENRGY
50/50
0.122
231505HR4
50/50
0.951
231901EM4
50/50
0.877
231907DC10
50/50
0.115
231908HR1
50/50
0.629
231909HR2
50/50
0.632
231910HR3
50/50
0.629
231916EM3
50/50
0.435
231917EM10
50/50
0.092
231918WEST 1
50/50
0.104
231919CHRIST1
50/50
2.482
231920CHRIST2
50/50
2.482
232416X2-083
50/50
0.015
232426Y1-080 FULL
Solar/Wind Harmer
0
218660EHAMPSOLAR C
Solar/Wind Harmer
0
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219276PARKLANDSO C
Solar/Wind Harmer
0
219615MILLCREEK C
Solar/Wind Harmer
0
219766PARADISE C
Solar/Wind Harmer
0
223402AF1-300 C
Solar/Wind Helper
0.053
208923BUSO V4-027
Solar/Wind Helper
0.013
233940AF2-379 C
Solar/Wind Harmer
0
233972AC1-094 C
Solar/Wind Harmer
0
219727YARDVSOLFA C
Solar/Wind Harmer
0
219907AC1-030 C
Solar/Wind Harmer
0
228754AB1-001 C
Solar/Wind Harmer
0
230422AE1-104_GEN1
Solar/Wind Harmer
13.092
230425AE1-104_GEN2
Solar/Wind Harmer
13.092
228351V2-046C
Solar/Wind Harmer
0
967451AG2-055 C O1
Solar/Wind Harmer
50.18
233946AB2-136 GEN
Solar/Wind Harmer
0
234033AF1-007_GEN
Solar/Wind Harmer
8.724
233987AB2-037 GEN
Solar/Wind Harmer
0
233968AD2-076_GEN
Solar/Wind Harmer
0.224
234012AE2-112_GEN
Solar/Wind Harmer
0.078
234014AF1-036_GEN
Solar/Wind Harmer
0.092
234015AF2-250 C
Solar/Wind Harmer
0
233990AG1-397 GEN
Solar/Wind Harmer
0.672
233990AG1-397 GEN
Solar/Wind Harmer
0
207522AF2-254 C
Solar/Wind Harmer
0.027
207500AE2-000G1
Solar/Wind Harmer
10.314
207497AE2-000G2
Solar/Wind Harmer
10.314
207507AE2-000G3
Solar/Wind Harmer
10.314
207487AE2-000G4
Solar/Wind Harmer
10.314
233923SMA
Solar/Wind Harmer
0
230433AD2-135 GEN
Solar/Wind Harmer
0
230430AE1-229_GEN
Solar/Wind Harmer
0
219906AC1-017 C
Solar/Wind Harmer
0
219623KINSLEYBEA C
Solar/Wind Harmer
0
219258KINSLEYDEP C
Solar/Wind Harmer
0
231902DC CT7
50/50
0.443
231906DC3 NUG
50/50
0.355
231915DC CT6
50/50
0.443
233964AF2-378 GEN
Solar/Wind Harmer
0
223401AF1-299 GEN
Solar/Wind Helper
0.053
230407AD2-065 C
Solar/Wind Harmer
0
233996TM1833_GEN
Solar/Wind Harmer
0
233997TMININ_4.2
Solar/Wind Harmer
0
233998TM1NIN_3.36
Solar/Wind Harmer
0
945431AF1-208 GEN
Solar/Wind Harmer
0.146
960671AF2-358 GEN
Solar/Wind Harmer
0.425
970025AG2-016 GEN
Solar/Wind Harmer
0.052
970277AG2-181 GEN
Solar/Wind Harmer
0.119
970453AG2-297 GEN
Solar/Wind Harmer
0.061
970545AG2-347 GEN
Solar/Wind Harmer
35.936
970597AG2-380 GEN
Solar/Wind Harmer
1.831
970695AG2-447 GEN
Solar/Wind Harmer
0.081
970997AG2-616 GEN
Solar/Wind Harmer
0.162
971011AG2-627 GEN
Solar/Wind Harmer
0.13
971149AH1-027 GEN
Solar/Wind Harmer
0.102
971189AH1-054 GEN
Solar/Wind Harmer
0.021
971195AH1-057 GEN
Solar/Wind Harmer
0.03
971535AH1-265 GEN
Solar/Wind Harmer
0.094
971553AH1-274 GEN
Solar/Wind Harmer
0.054
971667AH1-334 GEN
Solar/Wind Harmer
0.049
965821AG1-450 GEN
Solar/Wind Harmer
2.125
971747AH1-380 GEN
Solar/Wind Harmer
0.084
971983AH1-536 GEN
Solar/Wind Harmer
0.195
972069AH1-584 GEN
Solar/Wind Harmer
0.21
972071AH1-585 GEN
Solar/Wind Harmer
0.21
972073AH1-586 GEN
Solar/Wind Harmer
3.778
972133AH1-634 GEN
Solar/Wind Harmer
5.445
972141AH1-641 GEN
Solar/Wind Harmer
0.049
972177AH1-672 GEN
Solar/Wind Harmer
0.312
970431AG2-281 GEN
50/50
4.747
233984AB2-036 GEN
Solar/Wind Harmer
0.412
234041AC1-190 GEN
Solar/Wind Harmer
0.214
CBM NorthLTFEXP_CBM-N->PJM
CBM
12.425
G-007ALTFEXP_G-007A->PJM
CMTX
10.511
VFTLTFEXP_VFT->PJM
CMTX
25.801
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.959
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.567
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
3.752
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.798
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.487
MDUPJM->LTFIMP_MDU
CLTF
0

Details for [AG2-281] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.85 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:657.21
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.276

Details for [AG2-281] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.81 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:656.96
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.278

Details for [AG2-281] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.78 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:656.78
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.276

Details for [AG2-281] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:102.78 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:656.78
MW Contribution:4.28
IPD Plant:AG2-281
Bus #Bus NameTypeMW Contribution
970431AG2-281 GEN
PJM_IPD
4.276
CONTINGENCY 'PECO_P1-2_5014_SRT-A
 TRIP BRANCH FROM BUS 200065 TO BUS 200051 CKT 1   /*PCHBTM2S     500.0 - ROCKSPGS     500.0
END
CONTINGENCY 'PJM_500_BG_P4_5_CNSTN_C_SRT-A'
 OPEN BRANCH FROM BUS 200004 TO BUS 200064 CKT 1    /*CNASTONE     500.0 - PCHBTM1S     500.0
 OPEN BRANCH FROM BUS 200004 TO BUS 200100 CKT ZC   /*CNASTONE     500.0 - CNASTCAP     500.0
END
CONTINGENCY 'PECO_P4_PEACH235_SRT-A
 TRIP BRANCH FROM BUS 200064 TO BUS 200004 CKT 1    /*PCHBTM1S     500.0 - CNASTONE     500.0
 TRIP BRANCH FROM BUS 200064 TO BUS 200065 CKT Z1   /*PCHBTM1S     500.0 - PCHBTM2S     500.0
END
CONTINGENCY 'PECO_P1-2_5012_SRT-A'
 TRIP BRANCH FROM BUS 200064 TO BUS 200004 CKT 1   /*PCHBTM1S     500.0 - CNASTONE     500.0
END
CONTINGENCY 'BGE_P4_GRACETON_51_SRT-A'
 OPEN BRANCH FROM BUS 200004 TO BUS 200064 CKT 1   /*CNASTONE     500.0 - PCHBTM1S     500.0
END
CONTINGENCY 'AP_P1-2_PE-500-3835T_SRT-A'
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
END
CONTINGENCY 'AP_P2-3_PE-500-019E_SRT-W'
 DISCONNECT BRANCH FROM BUS 235105 TO BUS 235459 CKT 1   /*01DOUBS      500.0 - 01DOUBS      230.0
 DISCONNECT BRANCH FROM BUS 235105 TO BUS 235459 CKT 3   /*01DOUBS      500.0 - 01DOUBS      230.0
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
 REMOVE SWSHUNT FROM BUS 235105 BLOCK 1 STEP 2           /*01DOUBS      500.0
END
CONTINGENCY 'AP_P2-3_PE-500-019B_SRT-A'
 DISCONNECT BRANCH FROM BUS 235105 TO BUS 200003 CKT 1   /*01DOUBS      500.0 - BRIGHTON     500.0
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
END
CONTINGENCY 'PECO_P1-2_5007_SRT-A
 TRIP BRANCH FROM BUS 200066 TO BUS 270095 CKT 1   /*PCHBTM1N     500.0 - CHAN         500.0
END
214084 to 220964 ckt 1
213844 to 213846 ckt 1
213846 to 213869 ckt 1
200064 to 200004 ckt 1
213869 to 214087 ckt 1

Light Load Analysis

The New Service Request AG2-281 was evaluated as a 50.0 MW injection and 50.0 MW withdrawal in the DPL area.

AG2-281 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 50.0 MW (50.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Short Circuit Analysis

Short Circuit analysis is not performed as part of the Phase I System Impact Study. Short Circuit analysis will commence in the Phase II System Impact Study.

Stability Analysis

Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.

Reactive Power Analysis

Reactive Power analysis is not performed as part of the Phase I System Impact Study. Reactive Power analysis will commence in the Phase II System Impact Study.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AB1-001Absecon 12 kVIn Service
AB1-141Church-Wye Mills 138 kV IIn Service
AB1-142Church-Wye Mills 138 kV IIIn Service
AB1-176Price 25kV IIEngineering & Procurement
AB2-032Church-Wye Mills 138 kVIn Service
AB2-036Church - Oil City 138kVSuspended
AB2-037Keeney-Steele 230kVUnder Construction
AB2-133Chestertown 69kVUnder Construction
AB2-135Church-Kent 69kVIn Service
AB2-136Cambridge-West Cambridge 69kVUnder Construction
AB2-153Church-Wye Mills 138 kVIn Service
AB2-172Todd 69kVIn Service
AB2-179Townsend 138kVIn Service
AC1-010Gloucester 26kVUnder Construction
AC1-017Levittown 13 kVIn Service
AC1-030Cinnaminson 13kVIn Service
AC1-091Cedar Creek 138kV IEngineering & Procurement
AC1-092Cedar Creek 138kV IIEngineering & Procurement
AC1-093Cedar Creek 138kV IIIEngineering & Procurement
AC1-094Cedar Creek 138kV IVEngineering & Procurement
AC1-190East New Market 69kVSuspended
AC2-023Hebron 69kVEngineering & Procurement
AC2-185Cedar Creek 138kV IIEngineering & Procurement
AC2-186Harrington 25kVUnder Construction
AC2-187Harrington 69kVUnder Construction
AC2-188Harrington 69 kVUnder Construction
AD2-027Camden Switch 26 kVIn Service
AD2-042Camden Switch 26 kV IIIn Service
AD2-065Atco 12 kVIn Service
AD2-076Carville 138 kVSuspended
AD2-135Williamstown 12kVPartially in Service - Under Construction
AE1-104BL England 138 kVSuspended
AE1-229Deepwater-Upper Pittsgrove 138 kVSuspended
AE2-112Carville 138 kV IISuspended
AF1-007Indian River 230 kV ISuspended
AF1-036Carville 138 kV IIISuspended
AF1-208Laurel-Roadstown 69 kVWithdrawn
AF1-299Otter Point 34.5 kV IIn Service
AF1-300Otter Point 34.5 kV IIIn Service
AF2-060Wattsville 12 kVEngineering & Procurement
AF2-250Edgewood 12 kV IIIIn Service
AF2-254Cookstown-New Lisbon 34.5 kVSuspended
AF2-325Jacktown 12 kVEngineering & Procurement
AF2-358Airey-Vienna 69 kVActive
AF2-378Cambridge 12 kVEngineering & Procurement
AF2-379Princess Anne 25 kVUnder Construction
AG1-397Walston 12 kVWithdrawn
AG1-450Airey-Vienna 69 kV IIActive
AG2-016Oyster Creek-Whitings 34.5 kVActive
AG2-055Deans 500 kVWithdrawn
AG2-181Airey - Golden Hill 69 kVActive
AG2-297Cumberland 230 kVActive
AG2-347Indian River 230 kV IIActive
AG2-380Carville 138 kV IVActive
AG2-447Cedar Creek 138 kV VIIActive
AG2-616Churchtown - Upper Pittsgrove 138 kVActive
AG2-627Woodstown-High Street 69 kVActive
AH1-027Cartanza 230 kVActive
AH1-054Upton-Whitings 34.5 kVActive
AH1-057Edgewood 12.47 kVActive
AH1-265Winslow - Monroe 69kVActive
AH1-274Butler 69 kVActive
AH1-334Lakehurst - Whitings 34.5 kVActive
AH1-380Mt Olive - Kenny 69kVActive
AH1-536Church-Oil City 138kVActive
AH1-584Nelson-Indian River 138kVActive
AH1-585Nelson-Indian River 138kVActive
AH1-586Nelson-Indian River 138kVActive
AH1-634Indian River 230kV IActive
AH1-641Churchtown - Upper Pittsgrove 138kVActive
AH1-672Farmview 138 kVActive
AH1-710Salem 500kVActive
V2-046Pilesgrove Township 12kVIn Service
W1-003Oak HallIn Service
W1-004Oak HallIn Service
W1-005Oak HallIn Service
W1-006Oak HallIn Service
W1-062Clayton 138kVIn Service
X2-083Newark 12kVIn Service
X3-008Todd 69kVIn Service
X3-066Church Hill 69kVIn Service
Y1-079Wye Mills 69kVIn Service
Y1-080Dorchester 12kVIn Service
Y3-058Rockawalkin 69kVIn Service
Z2-076Worcester South 25kVIn Service
Z2-077Worcester North 25kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with potential Affected System impacts. PJM initiates coordination with each Affected System Operator by providing a list of New Service Requests in the Cycle with potential impacts to their respective system. If the Affected System Operator indicates an Affected System Study is required, PJM will notify the Project Developer or Eligible Customer of the need for an Affected System Study. See below if any Affected System Operator requires a study for this project:

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Phase I analysis results, this project may have a cost responsibility for the following System Reinforcements:

AG2-281 System Reinforcements:
TORTEP IDTitleAllocated Cost ($USD)
DPLn7042 / dt6704r0001Rebuild Kent to N. Meredith Tap. Upgrade disconnect switch @ N Meredith$4,929,705
DPLn6926 / dt22084r0001Rebuild (DPL) Claymont - (PECO) Linwood line and terminal equipment at Claymont.$913,981
PECOn7195 / pe025Rebuild 1.55 miles of 230 kV line from Linwood to Claymont with 2x1590 kcmil 54/19 ACSR$579,284
DPL(Pending) / 6704-2 KentUpgrade disconnect switch at Kent Substation$129,729
Grand Total:$6,552,699

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: n7042
Type
Load Flow
TO
DPL
RTEP ID / TO ID
n7042 / dt6704r0001
Title
Rebuild Kent to N. Meredith Tap. Upgrade disconnect switch @ N Meredith
Description
Rebuild 6704-2 Line from Kent to N. Meredith Tap. Upgrade disconnect switch @ N Meredith
Total Cost ($USD)
$7,600,000
Allocated Cost ($USD)
$4,929,705
Time Estimate
Oct 30 2026

Contributor

FacilityContingency
KENT-NMEREDTH 69.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-281
5.3 MW64.9%$4,929,705
AH1-536
2.9 MW35.1%$2,670,295

System Reinforcement: n6926
Type
Load Flow
TO
DPL
RTEP ID / TO ID
n6926 / dt22084r0001
Title
Rebuild (DPL) Claymont - (PECO) Linwood line and terminal equipment at Claymont.
Description
To mitigate the (DPL) Claymont - (PECO) Linwood line (from bus 213750 to 231000) overload, it will require incrasing the emergency rating of the Claymont - Linwood 230 kV line by rebuilding the line with new poles, foundations, insulators and OPGW and replacing terminal equipment at Claymont
Total Cost ($USD)
$7,100,000
Allocated Cost ($USD)
$913,981
Time Estimate
36 to 48 Months

Contributor

FacilityContingency
LINWOOD84-CLAY_230 230.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-281
8.1 MW12.9%$913,981
AG2-347
17.2 MW27.1%$1,927,545
AH1-584
4.3 MW6.9%$488,145
AH1-585
4.3 MW6.9%$488,145
AH1-586
6.5 MW10.3%$732,218
AH1-634
2.5 MW4.0%$281,458
AH1-672
9.1 MW14.3%$1,018,279
AH1-710
11.1 MW17.6%$1,250,227

System Reinforcement: n7195
Type
Load Flow
TO
PECO
RTEP ID / TO ID
n7195 / pe025
Title
Rebuild 1.55 miles of 230 kV line from Linwood to Claymont with 2x1590 kcmil 54/19 ACSR
Description
Rebuild 1.55 miles of 230 kV line from Linwood to Claymont with 2x1590 kcmil 54/19 ACSR
Total Cost ($USD)
$4,500,000
Allocated Cost ($USD)
$579,284
Time Estimate
36 Months

Contributor

FacilityContingency
LINWOOD84-CLAY_230 230.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-281
8.1 MW12.9%$579,284
AG2-347
17.2 MW27.1%$1,221,684
AH1-584
4.3 MW6.9%$309,388
AH1-585
4.3 MW6.9%$309,388
AH1-586
6.5 MW10.3%$464,082
AH1-634
2.5 MW4.0%$178,389
AH1-672
9.1 MW14.3%$645,388
AH1-710
11.1 MW17.6%$792,397

System Reinforcement
Type
Load Flow
TO
DPL
RTEP ID / TO ID
(Pending) / 6704-2 Kent
Title
Upgrade disconnect switch at Kent Substation
Description
Upgrade disconnect switch at Kent Substation
Total Cost ($USD)
$200,000
Allocated Cost ($USD)
$129,729
Time Estimate
24 to 30 Months

Contributor

FacilityContingency
KENT-NMEREDTH 69.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-281
5.3 MW64.9%$129,729
AH1-536
2.9 MW35.1%$70,271

System Reinforcement: b3800.37
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.37
Title
Replace terminal equipment limitations at Conastone 500 kV - on the (existing Peach Bottom-Conastone) or (new Graceton-Conastone) 500 kV line (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.6
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.6
Title
Build Granite substation + Statcom (Projected ISD 12/31/2028)
Description
Build Granite substation + Statcom. New STATCOM rating: 350 MVAR. Add 4x 230 kV breaker bays.
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.9
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.9
Title
Graceton to Batavia Road 230 kV double circuit pole line (Projected ISD 12/31/2028)
Description
Graceton to Batavia Road 230 kV double circuit pole line New rating: 1331 MVA SN/ 1594 MVA SE
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.32
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.32
Title
Build new North Delta-High Ridge 500 kV line - BGE Portion (Projected ISD 12/31/2030)
Description
Build new North Delta-High Ridge 500 kV line. (~59 miles)
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.36
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.36
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV (Projected ISD 12/31/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.26
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.26
Title
Build High Ridge 500 kV substation - Three bay breaker and half configuration (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.30
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.30
Title
High Ridge - Install two 500/230 kV transformers (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.13
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.13
Title
Batavia Road to Riverside 230 kV reconductor
Description
Batavia Road to Riverside 230 kV reconductor New rating: 1941 MVA SN / 2181 MVA SE
Cost Information
Time Estimate
Dec 31 2027

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.8
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.8
Title
Graceton 500 kV substation expansion (Projected ISD 12/31/2028)
Description
Add 3x 500 kV breaker bays, 2x 500/230 kV auto transformer, 1x 500 kV caps
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.29
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.29
Title
High Ridge termination for the North Delta-High Ridge 500 kV line (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.7
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.7
Title
Build new Batavia Road substation (Projected ISD 12/31/2028)
Description
Build Batavia Road substation. Add 4 x 230kV breaker bays
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.34
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.34
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV and cut into North Delta 500kV (Projected ISD 12/31/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.27
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.27
Title
High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) - Waugh Chapel side (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.5
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.5
Title
Build Solley Road substation + Statcom (Projected ISD 12/31/2028)
Description
Build Solley Road substation + Statcom. New STATCOM rating: 350 MVAR Add 4x 230 kV breakers bays.
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.28
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.28
Title
High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) -Brighton side (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3737.47
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3737.47
Title
Build New North Delta 500 kV substation (Four bay breaker and half configuration)
Description
Build New North Delta 500 kV substation (four bay breaker and half configuration) - the substation will include 12 - 500kV breakers and one 500/230 kV transformer, will allow the termination of six - 500 kV lines
Cost Information
Time Estimate
Oct 15 2027

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.44
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.44
Title
North Delta termination for the North Delta-High Ridge 500 line (PECO work).
Description
None
Cost Information
Time Estimate
Dec 01 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.1
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.1
Title
Peach Bottom North upgrades – substation work (Projected ISD 12/31/2028)
Description
Add 3x 500 kV breakers to form a breaker-and-a-half bay.
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.42
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.42
Title
Peach Bottom 500kV North bus upgrade (Projected ISD 12/1/2030)
Description
Peach Bottom 500kV North bus upgrade - Replace 11 – Instances of strain bus conductor used for breaker drops or CT drops, 7 – 500 kV disconnect switches, 7 – Free Standing CTs, 1 – 500 kV breaker, 2 – Breaker relays or meters.
Cost Information
Time Estimate
Dec 01 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.35
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.35
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV (Projected ISD 12/1/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 01 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.2
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.2
Title
Peach Bottom to Graceton (PECO Portion) – New 500kV Line
Description
Peach Bottom to Graceton (PECO Portion) – New 500kV Line. New rating: 4503 MVA SN/ 5022 MVA SE. This is a baseline identified for the announced Brandon Shores deactivation.
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.48
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.48
Title
North Delta termination for the North Delta-High Ridge 500 line (Transource work).
Description
None
Cost Information
Time Estimate
Dec 15 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.16
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.16
Title
Terminate new Cooper-North Delta 230 kV line (Transource Scope) at North Delta 230 kV
Description
None
Cost Information
Time Estimate
Oct 15 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.14
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.14
Title
Reconfigure Cooper transmission feeds by establishing new Cooper-North Delta 230 kV line and rerouting existing transmissions lines by Cooper.
Description
None
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3737.50
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3737.50
Title
Bring the Peach Bottom-Delta Power Plant 500 kV line “in and out” of North Delta
Description
Bring the Peach Bottom-Delta Power Plant 500 kV line “in and out” of North Delta by constructing a new Peach Bottom-North Delta 500 kV (0.3 miles) cut-in and cut-out lines.
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.15
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.15
Title
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub
Description
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV substation by rebuilding 5012 between new terminal at Peach Bottom South and North Delta on single circuit structures and terminating at North Delta.
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.51
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.51
Title
North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (Transource work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
May 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.50
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.50
Title
North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (Transource work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Jan 23 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.33
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.33
Title
Replace terminal equipment limitations at Brighton 500 kV - on the existing Brighton-Waugh Chapel 500 kV (5053) or new Brighton-High Ridge 500 kV.
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: n6927
Type
Load Flow
TO
DPL
RTEP ID / TO ID
n6927 / dt23015r0001
Title
Rebuild Edge Moor to Claymont 230 kV line. Upgrade terminal equipment at Claymont and Edge Moor.
Description
To mitigate the (DP&L) Edge Moor to Claymont 230 kV line (from bus 231000 to bus 231001 ckt 1) overload, it will require increasing the emergency rating of the Edge Moor to Claymont 230 kV line by rebuilding the circuit. The rebuild will include the installation of new poles, foundations, insulators, and conductor. In addition, terminal equipment will need to be upgraded at Claymont and Edge Moor Substations
Total Cost ($USD)
$23,000,000
Allocated Cost ($USD)
$0
Time Estimate
36 to 48 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG2-281 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-281 could receive cost allocation. Although AG2-281 may not presently have cost responsibility for this upgrade, AG2-281 is a potential Aggregate Pool Contributor.

FacilityContingency
CLAY_230-EDGEMR 5 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.4
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.4
Title
Peach Bottom to Graceton (BGE Portion) – New 500kV Line
Description
New rating: 4503 MVA SN/ 5022 MVA SE. This is a baseline identified for the announced Brandon Shores deactivation.
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.52
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.52
Title
Reconfigure Peach Bottom North and South 500 kV yards (Projected ISD 12/1/2030)
Description
Reconfigure Peach Bottom North and South yards to allow for termination of 500 kV lines from Peach Bottom to North Delta. North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line.
Cost Information
Time Estimate
Dec 01 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.47
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.47
Title
Build new Peach Bottom South-North Delta 500 kV line (Projected ISD 12/1/2030)
Description
Build new Peach Bottom South-North Delta 500 kV line – cut in to Peach Bottom tie No. 1 and extending line to North Delta (~1.25 miles new ROW).
Cost Information
Time Estimate
Dec 01 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.49
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.49
Title
North Delta 500 kV termination for the Calpine generator (Calpine/Transource work).
Description
None
Cost Information
Time Estimate
Oct 06 2027

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.17
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.17
Title
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub (Transource)
Description
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV substation by rebuilding 5012 between new terminal at Peach Bottom South and North Delta on single circuit structures and terminating at North Delta (Transource Scope).
Cost Information
Time Estimate
May 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.45
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.45
Title
North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (PECO work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Dec 01 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.31
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.31
Title
Build new North Delta-High Ridge 500 kV line - PECO Portion (Projected ISD 12/1/2030)
Description
None
Cost Information
Time Estimate
Dec 01 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: n6925
Type
Load Flow
TO
DPL
RTEP ID / TO ID
n6925 / dt22085r0001
Title
Rebuild Edge Moor (DPL) - Linwood (PECO) 230 kV line.
Description
Rebuilt DPL portion (8.1 mi.) of EDGEMR 5 230.0 kV to LINWOOD85 230.0 kV ckt 1 and install OPGW. o DPL SUM Rate A/B/C: 712/885/1106 MVA o DPL WIN Rate A/B/C: 822/978/1217 MVA
Total Cost ($USD)
$71,680,000
Allocated Cost ($USD)
$0
Time Estimate
36 to 48 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG2-281 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-281 could receive cost allocation. Although AG2-281 may not presently have cost responsibility for this upgrade, AG2-281 is a potential Aggregate Pool Contributor.

FacilityContingency
LINWOOD85-EDGEMR 5 230.0 kV Ckt 1 line(Any)

System Reinforcement: n7746
Type
Load Flow
TO
DPL
RTEP ID / TO ID
n7746 / ds22085r0001
Title
MEtering & Terminal upgrades at the Edge Moor 230kV Substation
Description
DPL future baseline: Replacement of 3 metering PT/CTs and upgrading stranded and rigid bus at Edgemoor to achieve Summer 1009/1159 MVA
Total Cost ($USD)
$1,100,000
Allocated Cost ($USD)
$0
Time Estimate
12 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG2-281 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-281 could receive cost allocation. Although AG2-281 may not presently have cost responsibility for this upgrade, AG2-281 is a potential Aggregate Pool Contributor.

FacilityContingency
LINWOOD85-EDGEMR 5 230.0 kV Ckt 1 line(Any)

System Reinforcement: n9371.0
Type
Load Flow
TO
PECO
RTEP ID / TO ID
n9371.0 / PECO 220-85
Title
Install OPGW on PECO portion of EDGEMR 5 230.0 kV to LINWOOD85 230.0 kV ckt 1
Description
Install OPGW on PECO portion of EDGEMR 5 230.0 kV to LINWOOD85 230.0 kV ckt 1
Total Cost ($USD)
$232,164
Allocated Cost ($USD)
$0
Time Estimate
36 to 60 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG2-281 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-281 could receive cost allocation. Although AG2-281 may not presently have cost responsibility for this upgrade, AG2-281 is a potential Aggregate Pool Contributor.

FacilityContingency
LINWOOD85-EDGEMR 5 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.11
Type
Load Flow
TO
PEPCO
RTEP ID / TO ID
b3780.11
Title
Brighton Statcom and Capacitor (Projected ISD 12/31/2028)
Description
Brighton Statcom and capacitor New STATCOM rating: 350 MVAR New capacitor rating: 350 MVAR
Cost Information
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.46
Type
Load Flow
TO
PEPCO
RTEP ID / TO ID
b3800.46
Title
North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (PECO work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Dec 01 2030

Not Contingent

Note: AG2-281 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-281 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
          Indian River 230 kV (DPL): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. 
          
          The following projects shared this POI:
          AG2-347, AH1-634
        
          Nelson - Indian River 138 kV (DPL): This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. 
          
          The following projects shared this POI:
          AH1-584, AH1-585, AH1-586
        

Attachments

AG2-281 One Line Diagram

AG2-281 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.