AG2-448 Phase I Study Report

v1.00 released 2025-10-29 22:11

Cross School - Westvaco 138 kV

30.0 MW Capacity / 50.0 MW Energy

Introduction

This Phase I System Impact Study Report (PH1) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, sections 307 and 308 for New Service Requests (projects) in Transition Cycle 2. The Project Developer/Eligible Customer (developer) is Potomac Hills Energy, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is The Potomac Edison Company.

Preface

The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
  1. PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
  2. PJM will only perform load flow analysis during the Phase I System Impact Study.
  3. In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with Affected System impacts and provides each Affected System Operator with a list of New Service Request in the Cycle with potential impacts to their respective system.
  4. PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
  5. The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase I System Impact Study:
  1. Identify required Interconnection Facilities to accommodate the New Service Request.
  2. Identify required Network Upgrades to mitigate system violations from the Phase I System Impact Study.
  3. Provide planning-level preliminary estimates of Interconnection Facilities and Network Upgrades including scope, cost and elapsed time to complete the work.

Decision Point I Requirements

At the close of Phase I System Impact Study, PJM will initiate Decision Point I (DP1). During DP1, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.A.1. Additional information on these elements is available in PJM Manual 14H sections 4.4, 6, and 7.

Allowable project modifications at Decision Point I are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

General

The Project Developer has proposed a Solar generating facility located in the The Potomac Edison Company zone — Mineral County, West Virginia. The installed facilities will have a total capability of 50.0 MW with 30.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG2-448
Project Name:
Cross School - Westvaco 138 kV
Project Developer Name:
Potomac Hills Energy, LLC
State:
West Virginia
County:
Mineral
Transmission Owner:
The Potomac Edison Company
MFO:
50.0
MWE:
50.0
MWC:
30.0
Fuel Type:
Solar
Basecase Study Year:
2028

Physical Interconnection Facility Study

Physical Interconnection Facilities Study is not performed as part of the Phase I System Impact Study. Physical Interconnection Facilities Study will commence in the Phase II System Impact Study.

Point of Interconnection

AG2-448 will interconnect on the The Potomac Edison Company transmission system by tapping the Cross School - Westvaco 139 kV line between Beryl Tap 138 kV and Westvaco 138 kV.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In the Phase I SIS, the costs shown are subject to change as a result of a facility study performed by the TO during the Phase II or Phase III System Impact Study.

Based on the Phase I SIS results, the AG2-448 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit are also shown below.

Cost Summary
DescriptionCost Allocated to AG2-448Cost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF)$823,627$0
Other Scope$59,600$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$13,600,571$13,600,571
Network Upgrades$1,731,575$1,731,575
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$25,310,241$25,310,241
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$41,525,614$40,642,387

* Contributes to calculation for Readiness Deposit #2 (RD2). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 309 (Decision Point I) A.1.a.i and PJM Manual 14H, section 6.2, Readiness Deposit #2 (RD2) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point I (DP1), the Project Developer or Eligible Customer is required to submit Readiness Deposit #2, which is calculated as 10% of cost allocation for required Phase I Network Upgrades minus Readiness Deposit #1.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Readiness Deposit #2 Due for Project AG2-448

Readiness Deposit #2 has been calculated for the project based on the Phase I System Impact Study results and is shown in the table below. This Readiness Deposit #2 must be provided at Decision Point I through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID10% of cost allocation for Phase I Network UpgradesReadiness Deposit #1 Received (RD1)Readiness Deposit #2 (RD2) for AG2-448 Project due at DP1
ABA - B
AG2-448$4,064,239$200,000$3,864,239

Note: Failure to provide an acceptable form of Readiness Deposit #2 by the end of Decision Point I will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Interconnection Facilities
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Integrate Interconnection Facilities protection and controls to the Transmission Owner system.$62,580 $62,580
(Pending)Construct one (1) span of conductor between the new interconnection substation takeoff structure and Project Developer owned dead end structure.$761,047 $761,047
Stand-Alone Network Upgrades
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Extend fiber to new interconnection substation.$372,500 $372,500
(Pending)Construct a new 138 kV 3-breaker ring bus interconnection substation.$13,228,071 $13,228,071
Network Upgrades
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Revise relay settings at Westvaco substation as required.$52,150 $52,150
(Pending)Revise relay settings at Beryl substation as required.$52,150 $52,150
(Pending)Cut the existing 138 kV line and loop in the new interconnection substation.$1,627,275 $1,627,275
Physical Interconnection
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Install 138 kV revenue metering within new interconnection substation.$59,600 $59,600

Based on the scope of work for the Interconnection Facilities, it is expected to take 41 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.

Transmission Owner Analysis

FE performed an analysis of its underlying transmission system <100 kV. New Service Request Project AG2-448 did not contribute to any overloads on the FE transmission <100 kV system.

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. FirstEnergy interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AG2-448 was evaluated as a 50.0 MW (30.0 MW Capacity) injection in the APS area.

AG2-448 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 50.0 MW (50.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P2-3_PE-500-014_SRT-SL
BreakerAC166.47 %206.0B342.9229.9
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P2-3_WP-500-DRT19_SRT-SL
BreakerAC162.98 %206.0B335.7329.9
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P1-2_PE-500-004_SRT-SL-2
SingleAC149.36 %206.0B307.6720.86
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P1-2_PE-500-004_SRT-SL-1
SingleAC145.88 %206.0B300.5120.86
IPDAP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P2-3_PE-500-014_SRT-SL
BreakerAC139.23 %206.0B286.8134.76
IPDAP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P1-2_PE-500-004_SRT-SL-2
SingleAC139.16 %206.0B286.6734.76
IPDAP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P2-3_WP-500-DRT19_SRT-SL
BreakerAC134.83 %206.0B277.7534.77
IPDAP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P1-2_PE-500-004_SRT-SL-1
SingleAC134.83 %206.0B277.7534.77
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P7-1_PE-138-012A_SRT-A
TowerAC129.27 %206.0B266.2930.17
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P2-2_WP-500-DRT9_SRT-SL
BusAC121.63 %206.0B250.5630.38
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P2-3_WP-500-DRT22_SRT-SL
BreakerAC121.62 %206.0B250.5430.38
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P2-3_MP-138-206_SRT-A
BreakerAC120.19 %206.0B247.5830.38
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P2-2_PE-138-021B_SRT-A
BusAC117.9 %206.0B242.8829.51
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P7-1_MP-138-058_SRT-A
TowerAC115.41 %206.0B237.7530.34
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
AP_P2-4_MP-138-162_SRT-A
BreakerAC115.4 %206.0B237.7230.34
GD2AP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Base Case
SingleAC107.92 %164.0A176.9821.28
IPDAP
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Base Case
SingleAC105.62 %164.0A173.2235.47
GD2AP
01BLACKO-01BLACKO 138.0/500.0 kV Ckt 3 transformer
AP_P2-3_PE-500-014_SRT-SL
BreakerAC108.3 %558.0B604.3217.02
GD2AP
01BLACKO-01BLACKO 138.0/500.0 kV Ckt 3 transformer
AP_P2-3_WP-500-DRT19_SRT-SL
BreakerAC103.19 %558.0B575.817.02
GD2AP
01CARLOS-01DANSMTN 138.0 kV Ckt 1 line
AP_P2-3_PE-138-007_SRT-A
BreakerAC100.57 %206.0B207.182.27
GD2AP
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
AP_P2-3_PE-500-014_SRT-SL
BreakerAC133.31 %268.0B357.2829.89
GD2AP
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
AP_P2-3_WP-500-DRT19_SRT-SL
BreakerAC130.58 %268.0B349.9629.9
GD2AP
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
AP_P1-2_PE-500-004_SRT-SL-2
SingleAC112.45 %268.0B301.3620.86
IPDAP
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
AP_P2-3_PE-500-014_SRT-SL
BreakerAC110.4 %268.0B295.8734.76
IPDAP
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
AP_P1-2_PE-500-004_SRT-SL-2
SingleAC110.37 %268.0B295.834.76
GD2AP
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
AP_P1-2_PE-500-004_SRT-SL-1
SingleAC109.71 %268.0B294.0220.86
GD2AP
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
AP_P7-1_PE-138-012A_SRT-A
TowerAC108.85 %268.0B291.7130.17
IPDAP
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
AP_P1-2_PE-500-004_SRT-SL-1
SingleAC106.99 %268.0B286.7434.76
IPDAP
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
AP_P2-3_WP-500-DRT19_SRT-SL
BreakerAC106.99 %268.0B286.7434.76
GD2AP
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
AP_P2-3_PE-500-018D_SRT-SL
BreakerAC112.33 %268.0B301.052.48
GD2AP
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
AP_P2-3_PE-500-018C_SRT-SL
BreakerAC112.07 %268.0B300.342.48
GD2AP
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
AP_P2-3_PE-500-016_SRT-SL
BreakerAC104.85 %268.0B281.04.51
GD2AP
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
AP_P2-3_PE-500-015_SRT-A
BreakerAC104.82 %268.0B280.924.51
GD2AP
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
AP_P1-2_PE-500-001_SRT-SL
SingleAC103.92 %268.0B278.511.75
GD2AP
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
AP_P1-2_WP-500-DRT17_SRT-SL
SingleAC103.92 %268.0B278.511.75
GD2AP
AG2-615 TP-01CARLOS 138.0 kV Ckt 1 line
AP_P2-3_PE-138-007_SRT-A
BreakerAC108.0 %206.0B222.482.32

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P2-3_PE-500-014_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-014_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:166.47 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:342.92
MW Contribution:29.9
Bus #Bus NameTypeMW Contribution
970935AG2-582 GEN
Adder
11.497
970697AG2-448 GEN
Solar/Wind Harmer
29.897
238185AF2-356 C
Solar/Wind Harmer
24.354
971679AH1-340 GEN
Solar/Wind Harmer
3.052
23750501ELLIOTTS
Solar/Wind Harmer
0.971
970801AG2-505 GEN
50/50
8.712
23750701CROSSCHOOL
Solar/Wind Helper
3.115
LAGNLTFEXP_LAGN->PJM
CLTF
0.311
TVALTFEXP_TVA->PJM
CLTF
0.151
NYPJM->LTFIMP_NY
CLTF
0.151
LGEELTFEXP_LGEE->PJM
CLTF
0.17
WECLTFEXP_WEC->PJM
CLTF
0.098
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.055
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.007
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.91
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.634
MECLTFEXP_MEC->PJM
CLTF
0.397
SIGELTFEXP_SIGE->PJM
CLTF
0.013
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.61

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P2-3_WP-500-DRT19_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_WP-500-DRT19_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:162.98 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:335.73
MW Contribution:29.9
Bus #Bus NameTypeMW Contribution
964991AG1-363 GEN
Solar/Wind Helper
1.776
970935AG2-582 GEN
Adder
11.619
970697AG2-448 GEN
Solar/Wind Harmer
29.899
238185AF2-356 C
Solar/Wind Harmer
24.357
971679AH1-340 GEN
Solar/Wind Harmer
3.055
23750501ELLIOTTS
Solar/Wind Harmer
0.972
970801AG2-505 GEN
50/50
8.713
23750701CROSSCHOOL
Solar/Wind Helper
3.114
LAGNLTFEXP_LAGN->PJM
CLTF
0.322
TVALTFEXP_TVA->PJM
CLTF
0.157
NYPJM->LTFIMP_NY
CLTF
0.148
LGEELTFEXP_LGEE->PJM
CLTF
0.174
WECLTFEXP_WEC->PJM
CLTF
0.1
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.051
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.005
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.989
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.654
MECLTFEXP_MEC->PJM
CLTF
0.406
SIGELTFEXP_SIGE->PJM
CLTF
0.013
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.683

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P1-2_PE-500-004_SRT-SL-2


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-004_SRT-SL-2
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:149.36 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:307.67
MW Contribution:20.86
Bus #Bus NameTypeMW Contribution
970935AG2-582 GEN
Adder
11.497
970697AG2-448 GEN
Solar/Wind Harmer
20.858
238185AF2-356 C
Solar/Wind Harmer
0.048
971679AH1-340 GEN
Solar/Wind Harmer
2.129
23750501ELLIOTTS
Solar/Wind Harmer
0
970801AG2-505 GEN
50/50
8.712
23750701CROSSCHOOL
Solar/Wind Helper
3.115
LAGNLTFEXP_LAGN->PJM
CLTF
0.311
TVALTFEXP_TVA->PJM
CLTF
0.151
NYPJM->LTFIMP_NY
CLTF
0.151
LGEELTFEXP_LGEE->PJM
CLTF
0.17
WECLTFEXP_WEC->PJM
CLTF
0.098
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.055
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.007
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.91
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.634
MECLTFEXP_MEC->PJM
CLTF
0.397
SIGELTFEXP_SIGE->PJM
CLTF
0.013
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.61

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P1-2_PE-500-004_SRT-SL-1


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-004_SRT-SL-1
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:145.88 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:300.51
MW Contribution:20.86
Bus #Bus NameTypeMW Contribution
964991AG1-363 GEN
Solar/Wind Helper
1.776
970935AG2-582 GEN
Adder
11.619
970697AG2-448 GEN
Solar/Wind Harmer
20.86
238185AF2-356 C
Solar/Wind Harmer
0.048
971679AH1-340 GEN
Solar/Wind Harmer
2.131
23750501ELLIOTTS
Solar/Wind Harmer
0
970801AG2-505 GEN
50/50
8.713
23750701CROSSCHOOL
Solar/Wind Helper
3.114
LAGNLTFEXP_LAGN->PJM
CLTF
0.322
TVALTFEXP_TVA->PJM
CLTF
0.157
NYPJM->LTFIMP_NY
CLTF
0.148
LGEELTFEXP_LGEE->PJM
CLTF
0.174
WECLTFEXP_WEC->PJM
CLTF
0.1
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.051
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.005
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.989
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.654
MECLTFEXP_MEC->PJM
CLTF
0.406
SIGELTFEXP_SIGE->PJM
CLTF
0.013
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.683

Details for [AG2-448] 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P2-3_PE-500-014_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-014_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:139.23 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:286.81
MW Contribution:34.76
IPD Plant:AG2-448
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
PJM_IPD
34.764

Details for [AG2-448] 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P1-2_PE-500-004_SRT-SL-2


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-004_SRT-SL-2
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:139.16 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:286.67
MW Contribution:34.76
IPD Plant:AG2-448
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
PJM_IPD
34.764

Details for [AG2-448] 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P2-3_WP-500-DRT19_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_WP-500-DRT19_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:134.83 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:277.75
MW Contribution:34.77
IPD Plant:AG2-448
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
PJM_IPD
34.767

Details for [AG2-448] 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P1-2_PE-500-004_SRT-SL-1


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-004_SRT-SL-1
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:134.83 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:277.75
MW Contribution:34.77
IPD Plant:AG2-448
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
PJM_IPD
34.767

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P7-1_PE-138-012A_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P7-1_PE-138-012A_SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:129.27 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:266.29
MW Contribution:30.17
Bus #Bus NameTypeMW Contribution
238120AE2-309 GEN
Solar/Wind Helper
0.281
970697AG2-448 GEN
Solar/Wind Harmer
30.173
238185AF2-356 C
Solar/Wind Harmer
24.766
238193AE1-106 GEN
Solar/Wind Harmer
5.337
238126S14_GEN_1
Solar/Wind Helper
0.523
23751201ROTHROCK
Solar/Wind Harmer
1.038
238118U2-030_1
Solar/Wind Harmer
0.478
971679AH1-340 GEN
Solar/Wind Harmer
3.675
23750501ELLIOTTS
Solar/Wind Harmer
1.151
970995AG2-615 GEN
Solar/Wind Harmer
6.063
23562501BACKB
Solar/Wind Harmer
1.262
970801AG2-505 GEN
50/50
8.819
23750701CROSSCHOOL
Solar/Wind Helper
3.048
238127S14_GEN_2
Solar/Wind Helper
0.523
970075AG2-062 GEN
Solar/Wind Harmer
3.787
238117U2-030
Solar/Wind Harmer
1.14
LAGNLTFEXP_LAGN->PJM
CLTF
0.218
TVALTFEXP_TVA->PJM
CLTF
0.106
NYPJM->LTFIMP_NY
CLTF
0.093
LGEELTFEXP_LGEE->PJM
CLTF
0.123
WECLTFEXP_WEC->PJM
CLTF
0.071
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.047
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.009
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.84
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.448
MECLTFEXP_MEC->PJM
CLTF
0.285
SIGELTFEXP_SIGE->PJM
CLTF
0.009
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.859

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P2-2_WP-500-DRT9_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_WP-500-DRT9_SRT-SL
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:121.63 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:250.56
MW Contribution:30.38
Bus #Bus NameTypeMW Contribution
970935AG2-582 GEN
Adder
11.79
970697AG2-448 GEN
Solar/Wind Harmer
30.376
238185AF2-356 C
Solar/Wind Harmer
24.755
23751201ROTHROCK
Solar/Wind Harmer
0.889
971679AH1-340 GEN
Solar/Wind Harmer
3.12
23750501ELLIOTTS
Solar/Wind Harmer
0.95
970801AG2-505 GEN
50/50
8.854
23750701CROSSCHOOL
Solar/Wind Helper
2.993
LAGNLTFEXP_LAGN->PJM
CLTF
0.368
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.186
TVALTFEXP_TVA->PJM
CLTF
0.183
NYPJM->LTFIMP_NY
CLTF
0.191
LGEELTFEXP_LGEE->PJM
CLTF
0.166
WECLTFEXP_WEC->PJM
CLTF
0.093
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.55
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.726
MECLTFEXP_MEC->PJM
CLTF
0.388
SIGELTFEXP_SIGE->PJM
CLTF
0.012
CPLELTFEXP_CPLE->PJM
CLTF
0.005
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.779

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P2-3_WP-500-DRT22_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_WP-500-DRT22_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:121.62 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:250.54
MW Contribution:30.38
Bus #Bus NameTypeMW Contribution
970935AG2-582 GEN
Adder
11.79
970697AG2-448 GEN
Solar/Wind Harmer
30.376
238185AF2-356 C
Solar/Wind Harmer
24.755
23751201ROTHROCK
Solar/Wind Harmer
0.889
971679AH1-340 GEN
Solar/Wind Harmer
3.12
23750501ELLIOTTS
Solar/Wind Harmer
0.95
970801AG2-505 GEN
50/50
8.854
23750701CROSSCHOOL
Solar/Wind Helper
2.993
LAGNLTFEXP_LAGN->PJM
CLTF
0.368
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.186
TVALTFEXP_TVA->PJM
CLTF
0.183
NYPJM->LTFIMP_NY
CLTF
0.191
LGEELTFEXP_LGEE->PJM
CLTF
0.166
WECLTFEXP_WEC->PJM
CLTF
0.093
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.55
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.726
MECLTFEXP_MEC->PJM
CLTF
0.388
SIGELTFEXP_SIGE->PJM
CLTF
0.012
CPLELTFEXP_CPLE->PJM
CLTF
0.005
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.779

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-206_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-206_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:120.19 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:247.58
MW Contribution:30.38
Bus #Bus NameTypeMW Contribution
970935AG2-582 GEN
Adder
11.829
970697AG2-448 GEN
Solar/Wind Harmer
30.376
238185AF2-356 C
Solar/Wind Harmer
24.756
23751201ROTHROCK
Solar/Wind Harmer
0.889
971679AH1-340 GEN
Solar/Wind Harmer
3.121
23750501ELLIOTTS
Solar/Wind Harmer
0.95
970801AG2-505 GEN
50/50
8.854
23750701CROSSCHOOL
Solar/Wind Helper
2.993
LAGNLTFEXP_LAGN->PJM
CLTF
0.372
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.192
TVALTFEXP_TVA->PJM
CLTF
0.184
NYPJM->LTFIMP_NY
CLTF
0.19
LGEELTFEXP_LGEE->PJM
CLTF
0.167
WECLTFEXP_WEC->PJM
CLTF
0.093
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.575
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.733
MECLTFEXP_MEC->PJM
CLTF
0.39
SIGELTFEXP_SIGE->PJM
CLTF
0.012
CPLELTFEXP_CPLE->PJM
CLTF
0.006
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.802

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P2-2_PE-138-021B_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_PE-138-021B_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:117.9 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:242.88
MW Contribution:29.51
Bus #Bus NameTypeMW Contribution
238120AE2-309 GEN
Solar/Wind Helper
0.217
970697AG2-448 GEN
Solar/Wind Harmer
29.509
238185AF2-356 C
Solar/Wind Harmer
24.167
238193AE1-106 GEN
Solar/Wind Harmer
4.954
942731AE2-289 GEN
Solar/Wind Harmer
2.458
238126S14_GEN_1
Solar/Wind Harmer
0.527
23751201ROTHROCK
Solar/Wind Harmer
0.938
238118U2-030_1
Solar/Wind Harmer
0.445
971679AH1-340 GEN
Solar/Wind Harmer
3.421
23750501ELLIOTTS
Solar/Wind Harmer
1.068
235531U2-073 GEN
Solar/Wind Harmer
2.616
970995AG2-615 GEN
Solar/Wind Harmer
3.906
970801AG2-505 GEN
50/50
8.617
238127S14_GEN_2
Solar/Wind Harmer
0.527
23750701CROSSCHOOL
Solar/Wind Helper
3.215
238117U2-030
Solar/Wind Harmer
1.059
LAGNLTFEXP_LAGN->PJM
CLTF
0.195
TVALTFEXP_TVA->PJM
CLTF
0.096
NYPJM->LTFIMP_NY
CLTF
0.092
LGEELTFEXP_LGEE->PJM
CLTF
0.106
WECLTFEXP_WEC->PJM
CLTF
0.061
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.032
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.003
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.423
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.398
MECLTFEXP_MEC->PJM
CLTF
0.246
SIGELTFEXP_SIGE->PJM
CLTF
0.008
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.629

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P7-1_MP-138-058_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P7-1_MP-138-058_SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:115.41 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:237.75
MW Contribution:30.34
Bus #Bus NameTypeMW Contribution
238109AE1-109 GEN2
Solar/Wind Helper
0.049
238110AE1-109 GEN3
Solar/Wind Helper
0.049
970697AG2-448 GEN
Solar/Wind Harmer
30.339
238185AF2-356 C
Solar/Wind Harmer
24.848
23751201ROTHROCK
Solar/Wind Harmer
0.955
971679AH1-340 GEN
Solar/Wind Harmer
3.495
23750501ELLIOTTS
Solar/Wind Harmer
1.089
235054AD2-180 GEN
Solar/Wind Harmer
3.42
238108AE1-109 GEN1
Solar/Wind Helper
0.049
970801AG2-505 GEN
50/50
8.86
23750701CROSSCHOOL
Solar/Wind Helper
3.005
23585401KL_K28_T16
Solar/Wind Harmer
3.348
LAGNLTFEXP_LAGN->PJM
CLTF
0.204
TVALTFEXP_TVA->PJM
CLTF
0.1
NYPJM->LTFIMP_NY
CLTF
0.102
LGEELTFEXP_LGEE->PJM
CLTF
0.11
WECLTFEXP_WEC->PJM
CLTF
0.063
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.034
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.004
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.523
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.416
MECLTFEXP_MEC->PJM
CLTF
0.257
SIGELTFEXP_SIGE->PJM
CLTF
0.008
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.7

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-162_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-162_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:115.4 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:237.72
MW Contribution:30.34
Bus #Bus NameTypeMW Contribution
238109AE1-109 GEN2
Solar/Wind Helper
0.049
238110AE1-109 GEN3
Solar/Wind Helper
0.049
970697AG2-448 GEN
Solar/Wind Harmer
30.339
238185AF2-356 C
Solar/Wind Harmer
24.848
23751201ROTHROCK
Solar/Wind Harmer
0.955
971679AH1-340 GEN
Solar/Wind Harmer
3.495
23750501ELLIOTTS
Solar/Wind Harmer
1.089
235054AD2-180 GEN
Solar/Wind Harmer
3.42
238108AE1-109 GEN1
Solar/Wind Helper
0.049
970801AG2-505 GEN
50/50
8.86
23750701CROSSCHOOL
Solar/Wind Helper
3.005
23585401KL_K28_T16
Solar/Wind Harmer
3.348
LAGNLTFEXP_LAGN->PJM
CLTF
0.204
TVALTFEXP_TVA->PJM
CLTF
0.1
NYPJM->LTFIMP_NY
CLTF
0.102
LGEELTFEXP_LGEE->PJM
CLTF
0.11
WECLTFEXP_WEC->PJM
CLTF
0.063
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.034
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.004
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.523
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.416
MECLTFEXP_MEC->PJM
CLTF
0.257
SIGELTFEXP_SIGE->PJM
CLTF
0.008
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.7

Details for 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.92 %
Rating:164.0 MVA
Rating Type:A
MVA to Mitigate:176.98
MW Contribution:21.28
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
Solar/Wind Harmer
21.279
238185AF2-356 C
Solar/Wind Harmer
0.049
23751201ROTHROCK
Solar/Wind Harmer
0
971679AH1-340 GEN
Solar/Wind Harmer
2.184
23750501ELLIOTTS
Solar/Wind Harmer
0
970801AG2-505 GEN
50/50
8.89
23750701CROSSCHOOL
Solar/Wind Helper
2.962
LAGNLTFEXP_LAGN->PJM
CLTF
0.179
TVALTFEXP_TVA->PJM
CLTF
0.088
NYPJM->LTFIMP_NY
CLTF
0.093
LGEELTFEXP_LGEE->PJM
CLTF
0.097
WECLTFEXP_WEC->PJM
CLTF
0.056
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.029
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.003
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.211
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.366
MECLTFEXP_MEC->PJM
CLTF
0.225
SIGELTFEXP_SIGE->PJM
CLTF
0.007
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.494

Details for [AG2-448] 01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:AP
Facility Description:
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:105.62 %
Rating:164.0 MVA
Rating Type:A
MVA to Mitigate:173.22
MW Contribution:35.47
IPD Plant:AG2-448
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
PJM_IPD
35.465

Details for 01BLACKO-01BLACKO 138.0/500.0 kV Ckt 3 transformer l/o AP_P2-3_PE-500-014_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01BLACKO-01BLACKO 138.0/500.0 kV Ckt 3 transformer
Contingency Name:
AP_P2-3_PE-500-014_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.3 %
Rating:558.0 MVA
Rating Type:B
MVA to Mitigate:604.32
MW Contribution:17.02
Bus #Bus NameTypeMW Contribution
238120AE2-309 GEN
Solar/Wind Harmer
1.009
238109AE1-109 GEN2
Solar/Wind Harmer
0.395
238110AE1-109 GEN3
Solar/Wind Harmer
0.395
970697AG2-448 GEN
Solar/Wind Harmer
17.016
238185AF2-356 C
Solar/Wind Harmer
14.715
238193AE1-106 GEN
Solar/Wind Harmer
8.096
20084026DEEPCRK1
50/50
0.068
942731AE2-289 GEN
Solar/Wind Harmer
7.516
944781AF1-143 GEN
Solar/Wind Harmer
1.377
238126S14_GEN_1
Solar/Wind Harmer
2.086
23751201ROTHROCK
Solar/Wind Harmer
1.941
20089226LOOKOUT
Solar/Wind Harmer
0.391
238118U2-030_1
Solar/Wind Harmer
1.267
20089126CSLMN_L13
Solar/Wind Harmer
0.402
23600101WARRIOR RN
50/50
39.966
20084126DEEPCRK2
50/50
0.068
235049AD1-125 C2
Solar/Wind Harmer
4.411
971679AH1-340 GEN
Solar/Wind Harmer
4.46
23750501ELLIOTTS
Solar/Wind Harmer
1.438
235054AD2-180 GEN
Solar/Wind Harmer
7.425
238108AE1-109 GEN1
Solar/Wind Harmer
0.395
235531U2-073 GEN
Solar/Wind Harmer
8.001
970995AG2-615 GEN
Solar/Wind Harmer
14.008
23562501BACKB
Solar/Wind Harmer
2.612
970801AG2-505 GEN
50/50
5.078
23750701CROSSCHOOL
Solar/Wind Harmer
11.756
238127S14_GEN_2
Solar/Wind Harmer
2.086
202652Y1-033 WT C
Solar/Wind Harmer
0.622
20089026BF_G21_K23
Solar/Wind Harmer
0.318
23585401KL_K28_T16
Solar/Wind Harmer
6.181
203955AF1-039 C O1
Solar/Wind Harmer
0.303
235048AD1-125 C1
Solar/Wind Harmer
4.411
970075AG2-062 GEN
Solar/Wind Harmer
7.838
238117U2-030
Solar/Wind Harmer
3.018
LAGNLTFEXP_LAGN->PJM
CLTF
0.723
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.035
TVALTFEXP_TVA->PJM
CLTF
0.356
NYPJM->LTFIMP_NY
CLTF
0.307
LGEELTFEXP_LGEE->PJM
CLTF
0.362
WECLTFEXP_WEC->PJM
CLTF
0.208
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.051
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.194
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.451
MECLTFEXP_MEC->PJM
CLTF
0.849
SIGELTFEXP_SIGE->PJM
CLTF
0.027
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.787

Details for 01BLACKO-01BLACKO 138.0/500.0 kV Ckt 3 transformer l/o AP_P2-3_WP-500-DRT19_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01BLACKO-01BLACKO 138.0/500.0 kV Ckt 3 transformer
Contingency Name:
AP_P2-3_WP-500-DRT19_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.19 %
Rating:558.0 MVA
Rating Type:B
MVA to Mitigate:575.8
MW Contribution:17.02
Bus #Bus NameTypeMW Contribution
964991AG1-363 GEN
Solar/Wind Helper
6.213
238120AE2-309 GEN
Solar/Wind Harmer
1.01
238109AE1-109 GEN2
Solar/Wind Harmer
0.395
238110AE1-109 GEN3
Solar/Wind Harmer
0.395
970697AG2-448 GEN
Solar/Wind Harmer
17.025
238185AF2-356 C
Solar/Wind Harmer
14.725
238193AE1-106 GEN
Solar/Wind Harmer
8.114
20084026DEEPCRK1
50/50
0.068
942731AE2-289 GEN
Solar/Wind Harmer
7.524
944781AF1-143 GEN
Solar/Wind Harmer
1.383
238126S14_GEN_1
Solar/Wind Harmer
2.088
23751201ROTHROCK
Solar/Wind Harmer
1.945
20089226LOOKOUT
Solar/Wind Harmer
0.393
238118U2-030_1
Solar/Wind Harmer
1.269
20089126CSLMN_L13
Solar/Wind Harmer
0.403
23600101WARRIOR RN
50/50
40.004
20084126DEEPCRK2
50/50
0.069
235049AD1-125 C2
Solar/Wind Harmer
4.415
971679AH1-340 GEN
Solar/Wind Harmer
4.469
23750501ELLIOTTS
Solar/Wind Harmer
1.442
235054AD2-180 GEN
Solar/Wind Harmer
7.432
238108AE1-109 GEN1
Solar/Wind Harmer
0.395
235531U2-073 GEN
Solar/Wind Harmer
8.009
970995AG2-615 GEN
Solar/Wind Harmer
14.023
23562501BACKB
Solar/Wind Harmer
2.617
970801AG2-505 GEN
50/50
5.081
23750701CROSSCHOOL
Solar/Wind Harmer
11.762
238127S14_GEN_2
Solar/Wind Harmer
2.088
202652Y1-033 WT C
Solar/Wind Harmer
0.624
20089026BF_G21_K23
Solar/Wind Harmer
0.319
23585401KL_K28_T16
Solar/Wind Harmer
6.188
203955AF1-039 C O1
Solar/Wind Harmer
0.304
235048AD1-125 C1
Solar/Wind Harmer
4.415
970075AG2-062 GEN
Solar/Wind Harmer
7.852
238117U2-030
Solar/Wind Harmer
3.022
LAGNLTFEXP_LAGN->PJM
CLTF
0.76
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.09
TVALTFEXP_TVA->PJM
CLTF
0.374
NYPJM->LTFIMP_NY
CLTF
0.296
LGEELTFEXP_LGEE->PJM
CLTF
0.375
WECLTFEXP_WEC->PJM
CLTF
0.215
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.038
CBM West 1LTFEXP_CBM-W1->PJM
CBM
8.46
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.52
MECLTFEXP_MEC->PJM
CLTF
0.88
SIGELTFEXP_SIGE->PJM
CLTF
0.028
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.032

Details for 01CARLOS-01DANSMTN 138.0 kV Ckt 1 line l/o AP_P2-3_PE-138-007_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01CARLOS-01DANSMTN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-138-007_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.57 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:207.18
MW Contribution:2.27
Bus #Bus NameTypeMW Contribution
238120AE2-309 GEN
Solar/Wind Harmer
0.236
20081326YOUGH
50/50
0.052
238185AF2-356 C
Solar/Wind Harmer
2.411
970697AG2-448 GEN
Solar/Wind Harmer
2.273
20084026DEEPCRK1
50/50
0.119
944781AF1-143 GEN
Solar/Wind Harmer
2.367
20083726HOMER C1
Adder
5.795
20083926HOMER C3
Adder
5.201
20083826HOMER C2
Adder
4.913
238126S14_GEN_1
Solar/Wind Helper
2.315
20089226LOOKOUT
Solar/Wind Harmer
0.672
20089126CSLMN_L13
Solar/Wind Harmer
0.691
238118U2-030_1
Solar/Wind Helper
0.449
20084126DEEPCRK2
50/50
0.121
970995AG2-615 GEN
Solar/Wind Harmer
39.88
235531U2-073 GEN
Solar/Wind Helper
5
202652Y1-033 WT C
Solar/Wind Harmer
1.085
20089026BF_G21_K23
Solar/Wind Harmer
0.547
970801AG2-505 GEN
Adder
0.698
23750701CROSSCHOOL
Solar/Wind Harmer
1.547
238127S14_GEN_2
Solar/Wind Helper
2.315
203955AF1-039 C O1
Solar/Wind Harmer
0.528
20083426SW_E13_K22
Solar/Wind Harmer
0.142
238208AF1-136 C
Solar/Wind Helper
0.095
238117U2-030
Solar/Wind Helper
0.449
LAGNLTFEXP_LAGN->PJM
CLTF
0.062
TVALTFEXP_TVA->PJM
CLTF
0.028
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
LGEELTFEXP_LGEE->PJM
CLTF
0.064
WECLTFEXP_WEC->PJM
CLTF
0.039
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.082
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.033
CBM West 1LTFEXP_CBM-W1->PJM
CBM
1.659
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.147
MECLTFEXP_MEC->PJM
CLTF
0.147
SIGELTFEXP_SIGE->PJM
CLTF
0.005
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.53
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.782
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0

Details for 01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line l/o AP_P2-3_PE-500-014_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-014_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:133.31 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:357.28
MW Contribution:29.89
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
Solar/Wind Harmer
29.894
238185AF2-356 C
Solar/Wind Harmer
24.351
971679AH1-340 GEN
Solar/Wind Harmer
3.05
23750501ELLIOTTS
Solar/Wind Harmer
0.97
970801AG2-505 GEN
50/50
8.712
23750701CROSSCHOOL
Solar/Wind Harmer
20.733
LAGNLTFEXP_LAGN->PJM
CLTF
0.3
TVALTFEXP_TVA->PJM
CLTF
0.146
NYPJM->LTFIMP_NY
CLTF
0.155
LGEELTFEXP_LGEE->PJM
CLTF
0.166
WECLTFEXP_WEC->PJM
CLTF
0.096
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.059
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.009
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.83
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.613
MECLTFEXP_MEC->PJM
CLTF
0.388
SIGELTFEXP_SIGE->PJM
CLTF
0.012
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.536

Details for 01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line l/o AP_P2-3_WP-500-DRT19_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_WP-500-DRT19_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:130.58 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:349.96
MW Contribution:29.9
Bus #Bus NameTypeMW Contribution
964991AG1-363 GEN
Solar/Wind Helper
1.778
970697AG2-448 GEN
Solar/Wind Harmer
29.897
238185AF2-356 C
Solar/Wind Harmer
24.354
971679AH1-340 GEN
Solar/Wind Harmer
3.052
23750501ELLIOTTS
Solar/Wind Harmer
0.971
970801AG2-505 GEN
50/50
8.712
23750701CROSSCHOOL
Solar/Wind Harmer
20.735
LAGNLTFEXP_LAGN->PJM
CLTF
0.311
TVALTFEXP_TVA->PJM
CLTF
0.151
NYPJM->LTFIMP_NY
CLTF
0.151
LGEELTFEXP_LGEE->PJM
CLTF
0.17
WECLTFEXP_WEC->PJM
CLTF
0.098
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.055
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.007
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.909
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.633
MECLTFEXP_MEC->PJM
CLTF
0.397
SIGELTFEXP_SIGE->PJM
CLTF
0.013
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.609

Details for 01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line l/o AP_P1-2_PE-500-004_SRT-SL-2


Base Case Flowgate

Area:AP
Facility Description:
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-004_SRT-SL-2
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:112.45 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:301.36
MW Contribution:20.86
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
Solar/Wind Harmer
20.856
238185AF2-356 C
Solar/Wind Harmer
0.048
971679AH1-340 GEN
Solar/Wind Harmer
2.127
23750501ELLIOTTS
Solar/Wind Harmer
0
970801AG2-505 GEN
50/50
8.712
23750701CROSSCHOOL
Solar/Wind Harmer
0.006
LAGNLTFEXP_LAGN->PJM
CLTF
0.3
TVALTFEXP_TVA->PJM
CLTF
0.146
NYPJM->LTFIMP_NY
CLTF
0.155
LGEELTFEXP_LGEE->PJM
CLTF
0.166
WECLTFEXP_WEC->PJM
CLTF
0.096
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.059
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.009
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.83
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.613
MECLTFEXP_MEC->PJM
CLTF
0.388
SIGELTFEXP_SIGE->PJM
CLTF
0.012
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.536

Details for [AG2-448] 01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line l/o AP_P2-3_PE-500-014_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-014_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:110.4 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:295.87
MW Contribution:34.76
IPD Plant:AG2-448
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
PJM_IPD
34.76

Details for [AG2-448] 01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line l/o AP_P1-2_PE-500-004_SRT-SL-2


Base Case Flowgate

Area:AP
Facility Description:
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-004_SRT-SL-2
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:110.37 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:295.8
MW Contribution:34.76
IPD Plant:AG2-448
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
PJM_IPD
34.76

Details for 01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line l/o AP_P1-2_PE-500-004_SRT-SL-1


Base Case Flowgate

Area:AP
Facility Description:
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-004_SRT-SL-1
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:109.71 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:294.02
MW Contribution:20.86
Bus #Bus NameTypeMW Contribution
964991AG1-363 GEN
Solar/Wind Helper
1.778
970697AG2-448 GEN
Solar/Wind Harmer
20.858
238185AF2-356 C
Solar/Wind Harmer
0.048
971679AH1-340 GEN
Solar/Wind Harmer
2.129
23750501ELLIOTTS
Solar/Wind Harmer
0
970801AG2-505 GEN
50/50
8.712
23750701CROSSCHOOL
Solar/Wind Harmer
0.006
LAGNLTFEXP_LAGN->PJM
CLTF
0.311
TVALTFEXP_TVA->PJM
CLTF
0.151
NYPJM->LTFIMP_NY
CLTF
0.151
LGEELTFEXP_LGEE->PJM
CLTF
0.17
WECLTFEXP_WEC->PJM
CLTF
0.098
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.055
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.007
CBM West 1LTFEXP_CBM-W1->PJM
CBM
3.909
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.633
MECLTFEXP_MEC->PJM
CLTF
0.397
SIGELTFEXP_SIGE->PJM
CLTF
0.013
CBM West 2LTFEXP_CBM-W2->PJM
CBM
2.609

Details for 01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line l/o AP_P7-1_PE-138-012A_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
Contingency Name:
AP_P7-1_PE-138-012A_SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:108.85 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:291.71
MW Contribution:30.17
Bus #Bus NameTypeMW Contribution
238120AE2-309 GEN
Solar/Wind Helper
0.282
970697AG2-448 GEN
Solar/Wind Harmer
30.17
238185AF2-356 C
Solar/Wind Harmer
24.764
238193AE1-106 GEN
Solar/Wind Harmer
5.332
238126S14_GEN_1
Solar/Wind Helper
0.523
23751201ROTHROCK
Solar/Wind Harmer
1.037
238118U2-030_1
Solar/Wind Harmer
0.478
971679AH1-340 GEN
Solar/Wind Harmer
3.672
23750501ELLIOTTS
Solar/Wind Harmer
1.15
970995AG2-615 GEN
Solar/Wind Harmer
6.058
23562501BACKB
Solar/Wind Harmer
1.261
970801AG2-505 GEN
50/50
8.818
23750701CROSSCHOOL
Solar/Wind Harmer
20.915
238127S14_GEN_2
Solar/Wind Helper
0.523
970075AG2-062 GEN
Solar/Wind Harmer
3.782
238117U2-030
Solar/Wind Harmer
1.139
LAGNLTFEXP_LAGN->PJM
CLTF
0.207
TVALTFEXP_TVA->PJM
CLTF
0.101
NYPJM->LTFIMP_NY
CLTF
0.096
LGEELTFEXP_LGEE->PJM
CLTF
0.119
WECLTFEXP_WEC->PJM
CLTF
0.069
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.05
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.011
CBM West 1LTFEXP_CBM-W1->PJM
CBM
2.76
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.427
MECLTFEXP_MEC->PJM
CLTF
0.276
SIGELTFEXP_SIGE->PJM
CLTF
0.009
CBM West 2LTFEXP_CBM-W2->PJM
CBM
1.786

Details for [AG2-448] 01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line l/o AP_P1-2_PE-500-004_SRT-SL-1


Base Case Flowgate

Area:AP
Facility Description:
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-004_SRT-SL-1
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:106.99 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:286.74
MW Contribution:34.76
IPD Plant:AG2-448
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
PJM_IPD
34.764

Details for [AG2-448] 01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line l/o AP_P2-3_WP-500-DRT19_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01CROSSCHOOL-01BLACKO 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_WP-500-DRT19_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:106.99 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:286.74
MW Contribution:34.76
IPD Plant:AG2-448
Bus #Bus NameTypeMW Contribution
970697AG2-448 GEN
PJM_IPD
34.764

Details for 01MORGAN-01CHERYR 138.0 kV Ckt 1 line l/o AP_P2-3_PE-500-018D_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-018D_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:112.33 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:301.05
MW Contribution:2.48
Bus #Bus NameTypeMW Contribution
237080AD1-060 GEN
Solar/Wind Helper
0.198
238120AE2-309 GEN
Solar/Wind Harmer
0.566
970697AG2-448 GEN
Solar/Wind Harmer
2.485
238185AF2-356 C
Solar/Wind Harmer
2.398
942731AE2-289 GEN
Solar/Wind Harmer
5.214
235020AA1-095 C
Solar/Wind Helper
0.025
238126S14_GEN_1
Solar/Wind Harmer
1.437
237085AD2-009_GEN
Solar/Wind Helper
1.357
238221AF1-254 C O1
Solar/Wind Helper
0.135
238118U2-030_1
Solar/Wind Harmer
0.854
237038AE2-054 C
Solar/Wind Helper
0.18
23600101WARRIOR RN
50/50
28.82
235063AE1-101 C2
Solar/Wind Helper
1.14
237001AB1-127_GEN
Solar/Wind Helper
0.25
235531U2-073 GEN
Solar/Wind Harmer
5.55
970995AG2-615 GEN
Solar/Wind Harmer
9.272
238127S14_GEN_2
Solar/Wind Harmer
1.437
23750701CROSSCHOOL
Solar/Wind Harmer
1.703
970801AG2-505 GEN
Adder
0.731
235062AE1-101 C1
Solar/Wind Helper
1.14
237002AB1-128_GEN
Solar/Wind Helper
0.268
23777901MDS_W4-102
Solar/Wind Helper
0.076
238117U2-030
Solar/Wind Harmer
2.033
235067AD1-061 GEN
Solar/Wind Helper
0.34
LAGNLTFEXP_LAGN->PJM
CLTF
0.434
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.131
TVALTFEXP_TVA->PJM
CLTF
0.214
NYPJM->LTFIMP_NY
CLTF
0.174
LGEELTFEXP_LGEE->PJM
CLTF
0.205
WECLTFEXP_WEC->PJM
CLTF
0.117
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.615
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.86
MECLTFEXP_MEC->PJM
CLTF
0.484
SIGELTFEXP_SIGE->PJM
CLTF
0.015
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.371

Details for 01MORGAN-01CHERYR 138.0 kV Ckt 1 line l/o AP_P2-3_PE-500-018C_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-018C_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:112.07 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:300.34
MW Contribution:2.48
Bus #Bus NameTypeMW Contribution
237080AD1-060 GEN
Solar/Wind Helper
0.197
238120AE2-309 GEN
Solar/Wind Harmer
0.566
970697AG2-448 GEN
Solar/Wind Harmer
2.485
238185AF2-356 C
Solar/Wind Harmer
2.398
942731AE2-289 GEN
Solar/Wind Harmer
5.215
235020AA1-095 C
Solar/Wind Helper
0.025
238126S14_GEN_1
Solar/Wind Harmer
1.437
237085AD2-009_GEN
Solar/Wind Helper
1.355
238221AF1-254 C O1
Solar/Wind Helper
0.135
238118U2-030_1
Solar/Wind Harmer
0.854
237038AE2-054 C
Solar/Wind Helper
0.179
23600101WARRIOR RN
50/50
28.827
235063AE1-101 C2
Solar/Wind Helper
1.138
237001AB1-127_GEN
Solar/Wind Helper
0.25
235531U2-073 GEN
Solar/Wind Harmer
5.551
970995AG2-615 GEN
Solar/Wind Harmer
9.274
238127S14_GEN_2
Solar/Wind Harmer
1.437
23750701CROSSCHOOL
Solar/Wind Harmer
1.704
970801AG2-505 GEN
Adder
0.732
235062AE1-101 C1
Solar/Wind Helper
1.138
237002AB1-128_GEN
Solar/Wind Helper
0.268
23777901MDS_W4-102
Solar/Wind Helper
0.076
238117U2-030
Solar/Wind Harmer
2.034
235067AD1-061 GEN
Solar/Wind Helper
0.34
LAGNLTFEXP_LAGN->PJM
CLTF
0.434
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.131
TVALTFEXP_TVA->PJM
CLTF
0.214
NYPJM->LTFIMP_NY
CLTF
0.174
LGEELTFEXP_LGEE->PJM
CLTF
0.205
WECLTFEXP_WEC->PJM
CLTF
0.117
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.616
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.86
MECLTFEXP_MEC->PJM
CLTF
0.484
SIGELTFEXP_SIGE->PJM
CLTF
0.015
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.372

Details for 01MORGAN-01CHERYR 138.0 kV Ckt 1 line l/o AP_P2-3_PE-500-016_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-016_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.85 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:281.0
MW Contribution:4.51
Bus #Bus NameTypeMW Contribution
237080AD1-060 GEN
Solar/Wind Helper
0.176
238120AE2-309 GEN
Solar/Wind Harmer
0.692
238109AE1-109 GEN2
Solar/Wind Harmer
0.107
238110AE1-109 GEN3
Solar/Wind Harmer
0.107
970697AG2-448 GEN
Solar/Wind Harmer
4.514
238185AF2-356 C
Solar/Wind Harmer
4.142
238193AE1-106 GEN
Solar/Wind Harmer
4.521
942731AE2-289 GEN
Solar/Wind Harmer
6.163
235020AA1-095 C
Solar/Wind Helper
0.021
238126S14_GEN_1
Solar/Wind Harmer
1.701
237085AD2-009_GEN
Solar/Wind Helper
1.242
238221AF1-254 C O1
Solar/Wind Helper
0.119
238118U2-030_1
Solar/Wind Harmer
1.012
237038AE2-054 C
Solar/Wind Helper
0.162
23600101WARRIOR RN
50/50
33.936
235063AE1-101 C2
Solar/Wind Helper
1.035
237001AB1-127_GEN
Solar/Wind Helper
0.225
235049AD1-125 C2
Solar/Wind Harmer
1.276
235531U2-073 GEN
Solar/Wind Harmer
6.561
970995AG2-615 GEN
Solar/Wind Harmer
11.031
235054AD2-180 GEN
Solar/Wind Harmer
2.477
238108AE1-109 GEN1
Solar/Wind Harmer
0.107
238127S14_GEN_2
Solar/Wind Harmer
1.701
23750701CROSSCHOOL
Solar/Wind Harmer
3.106
970801AG2-505 GEN
Adder
1.301
235062AE1-101 C1
Solar/Wind Helper
1.035
23585401KL_K28_T16
Solar/Wind Harmer
2.209
237002AB1-128_GEN
Solar/Wind Helper
0.242
235048AD1-125 C1
Solar/Wind Harmer
1.276
238117U2-030
Solar/Wind Harmer
2.411
235067AD1-061 GEN
Solar/Wind Helper
0.308
LAGNLTFEXP_LAGN->PJM
CLTF
0.415
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.162
TVALTFEXP_TVA->PJM
CLTF
0.205
NYPJM->LTFIMP_NY
CLTF
0.165
LGEELTFEXP_LGEE->PJM
CLTF
0.192
WECLTFEXP_WEC->PJM
CLTF
0.109
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.282
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.819
MECLTFEXP_MEC->PJM
CLTF
0.452
SIGELTFEXP_SIGE->PJM
CLTF
0.014
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.182

Details for 01MORGAN-01CHERYR 138.0 kV Ckt 1 line l/o AP_P2-3_PE-500-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-015_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.82 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:280.92
MW Contribution:4.51
Bus #Bus NameTypeMW Contribution
237080AD1-060 GEN
Solar/Wind Helper
0.176
238120AE2-309 GEN
Solar/Wind Harmer
0.692
238109AE1-109 GEN2
Solar/Wind Harmer
0.107
238110AE1-109 GEN3
Solar/Wind Harmer
0.107
970697AG2-448 GEN
Solar/Wind Harmer
4.514
238185AF2-356 C
Solar/Wind Harmer
4.142
238193AE1-106 GEN
Solar/Wind Harmer
4.521
942731AE2-289 GEN
Solar/Wind Harmer
6.163
235020AA1-095 C
Solar/Wind Helper
0.021
238126S14_GEN_1
Solar/Wind Harmer
1.701
237085AD2-009_GEN
Solar/Wind Helper
1.242
238221AF1-254 C O1
Solar/Wind Helper
0.119
238118U2-030_1
Solar/Wind Harmer
1.012
237038AE2-054 C
Solar/Wind Helper
0.162
23600101WARRIOR RN
50/50
33.936
235063AE1-101 C2
Solar/Wind Helper
1.035
237001AB1-127_GEN
Solar/Wind Helper
0.225
235049AD1-125 C2
Solar/Wind Harmer
1.276
235531U2-073 GEN
Solar/Wind Harmer
6.561
970995AG2-615 GEN
Solar/Wind Harmer
11.031
235054AD2-180 GEN
Solar/Wind Harmer
2.477
238108AE1-109 GEN1
Solar/Wind Harmer
0.107
238127S14_GEN_2
Solar/Wind Harmer
1.701
23750701CROSSCHOOL
Solar/Wind Harmer
3.106
970801AG2-505 GEN
Adder
1.301
235062AE1-101 C1
Solar/Wind Helper
1.035
23585401KL_K28_T16
Solar/Wind Harmer
2.209
237002AB1-128_GEN
Solar/Wind Helper
0.242
235048AD1-125 C1
Solar/Wind Harmer
1.276
238117U2-030
Solar/Wind Harmer
2.411
235067AD1-061 GEN
Solar/Wind Helper
0.308
LAGNLTFEXP_LAGN->PJM
CLTF
0.415
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.162
TVALTFEXP_TVA->PJM
CLTF
0.205
NYPJM->LTFIMP_NY
CLTF
0.165
LGEELTFEXP_LGEE->PJM
CLTF
0.192
WECLTFEXP_WEC->PJM
CLTF
0.109
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.282
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.819
MECLTFEXP_MEC->PJM
CLTF
0.452
SIGELTFEXP_SIGE->PJM
CLTF
0.014
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.182

Details for 01MORGAN-01CHERYR 138.0 kV Ckt 1 line l/o AP_P1-2_PE-500-001_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-001_SRT-SL
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:103.92 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:278.51
MW Contribution:1.75
Bus #Bus NameTypeMW Contribution
237080AD1-060 GEN
Solar/Wind Helper
0.185
238120AE2-309 GEN
Solar/Wind Harmer
0.235
970697AG2-448 GEN
Solar/Wind Harmer
1.75
238185AF2-356 C
Solar/Wind Harmer
0.005
20084026DEEPCRK1
50/50
0.035
942731AE2-289 GEN
Solar/Wind Harmer
1.644
235020AA1-095 C
Solar/Wind Helper
0.022
238126S14_GEN_1
Solar/Wind Harmer
0.101
237085AD2-009_GEN
Solar/Wind Helper
1.299
238221AF1-254 C O1
Solar/Wind Helper
0.125
238118U2-030_1
Solar/Wind Harmer
0
237038AE2-054 C
Solar/Wind Helper
0.17
23600101WARRIOR RN
50/50
29.056
20084126DEEPCRK2
50/50
0.035
235063AE1-101 C2
Solar/Wind Helper
1.084
237001AB1-127_GEN
Solar/Wind Helper
0.236
235531U2-073 GEN
Solar/Wind Harmer
0.146
970995AG2-615 GEN
Solar/Wind Harmer
8.017
970801AG2-505 GEN
50/50
0.784
238127S14_GEN_2
Solar/Wind Harmer
0.101
23750701CROSSCHOOL
Solar/Wind Harmer
0
235062AE1-101 C1
Solar/Wind Helper
1.084
237002AB1-128_GEN
Solar/Wind Helper
0.254
238117U2-030
Solar/Wind Harmer
0
235067AD1-061 GEN
Solar/Wind Helper
0.323
LAGNLTFEXP_LAGN->PJM
CLTF
0.435
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.122
TVALTFEXP_TVA->PJM
CLTF
0.214
NYPJM->LTFIMP_NY
CLTF
0.174
LGEELTFEXP_LGEE->PJM
CLTF
0.206
WECLTFEXP_WEC->PJM
CLTF
0.118
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.002
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.648
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.862
MECLTFEXP_MEC->PJM
CLTF
0.487
SIGELTFEXP_SIGE->PJM
CLTF
0.015
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.384

Details for 01MORGAN-01CHERYR 138.0 kV Ckt 1 line l/o AP_P1-2_WP-500-DRT17_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
01MORGAN-01CHERYR 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_WP-500-DRT17_SRT-SL
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:103.92 %
Rating:268.0 MVA
Rating Type:B
MVA to Mitigate:278.51
MW Contribution:1.75
Bus #Bus NameTypeMW Contribution
237080AD1-060 GEN
Solar/Wind Helper
0.185
238120AE2-309 GEN
Solar/Wind Harmer
0.235
970697AG2-448 GEN
Solar/Wind Harmer
1.75
238185AF2-356 C
Solar/Wind Harmer
0.005
20084026DEEPCRK1
50/50
0.035
942731AE2-289 GEN
Solar/Wind Harmer
1.644
235020AA1-095 C
Solar/Wind Helper
0.022
238126S14_GEN_1
Solar/Wind Harmer
0.101
237085AD2-009_GEN
Solar/Wind Helper
1.299
238221AF1-254 C O1
Solar/Wind Helper
0.125
238118U2-030_1
Solar/Wind Harmer
0
237038AE2-054 C
Solar/Wind Helper
0.17
23600101WARRIOR RN
50/50
29.056
20084126DEEPCRK2
50/50
0.035
235063AE1-101 C2
Solar/Wind Helper
1.084
237001AB1-127_GEN
Solar/Wind Helper
0.236
235531U2-073 GEN
Solar/Wind Harmer
0.146
970995AG2-615 GEN
Solar/Wind Harmer
8.017
970801AG2-505 GEN
50/50
0.784
238127S14_GEN_2
Solar/Wind Harmer
0.101
23750701CROSSCHOOL
Solar/Wind Harmer
0
235062AE1-101 C1
Solar/Wind Helper
1.084
237002AB1-128_GEN
Solar/Wind Helper
0.254
238117U2-030
Solar/Wind Harmer
0
235067AD1-061 GEN
Solar/Wind Helper
0.323
LAGNLTFEXP_LAGN->PJM
CLTF
0.435
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.122
TVALTFEXP_TVA->PJM
CLTF
0.214
NYPJM->LTFIMP_NY
CLTF
0.174
LGEELTFEXP_LGEE->PJM
CLTF
0.206
WECLTFEXP_WEC->PJM
CLTF
0.118
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.002
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.648
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.862
MECLTFEXP_MEC->PJM
CLTF
0.487
SIGELTFEXP_SIGE->PJM
CLTF
0.015
CBM West 2LTFEXP_CBM-W2->PJM
CBM
3.384

Details for AG2-615 TP-01CARLOS 138.0 kV Ckt 1 line l/o AP_P2-3_PE-138-007_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
AG2-615 TP-01CARLOS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-138-007_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.0 %
Rating:206.0 MVA
Rating Type:B
MVA to Mitigate:222.48
MW Contribution:2.32
Bus #Bus NameTypeMW Contribution
238120AE2-309 GEN
Solar/Wind Helper
1
20081326YOUGH
50/50
0.054
238185AF2-356 C
Solar/Wind Harmer
2.458
970697AG2-448 GEN
Solar/Wind Harmer
2.318
971423AH1-203 GEN
Solar/Wind Harmer
3.025
20084026DEEPCRK1
50/50
0.125
944781AF1-143 GEN
Solar/Wind Harmer
2.486
20083726HOMER C1
Adder
6.086
20083926HOMER C3
Adder
5.461
20083826HOMER C2
Adder
5.158
238126S14_GEN_1
Solar/Wind Helper
2.178
20089226LOOKOUT
Solar/Wind Harmer
0.706
20089126CSLMN_L13
Solar/Wind Harmer
0.725
238118U2-030_1
Solar/Wind Helper
0.45
20084126DEEPCRK2
50/50
0.127
970995AG2-615 GEN
Solar/Wind Harmer
42.038
235531U2-073 GEN
Solar/Wind Helper
5.015
202652Y1-033 WT C
Solar/Wind Harmer
1.139
20089026BF_G21_K23
Solar/Wind Harmer
0.574
23750701CROSSCHOOL
Solar/Wind Harmer
1.577
970801AG2-505 GEN
Adder
0.711
238127S14_GEN_2
Solar/Wind Helper
2.178
203955AF1-039 C O1
Solar/Wind Harmer
0.555
20083426SW_E13_K22
Solar/Wind Harmer
0.149
238208AF1-136 C
Solar/Wind Helper
0.095
238117U2-030
Solar/Wind Helper
0.45
LAGNLTFEXP_LAGN->PJM
CLTF
0.062
TVALTFEXP_TVA->PJM
CLTF
0.028
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
LGEELTFEXP_LGEE->PJM
CLTF
0.065
WECLTFEXP_WEC->PJM
CLTF
0.04
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.084
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.035
CBM West 1LTFEXP_CBM-W1->PJM
CBM
1.698
CBM South 1LTFEXP_CBM-S1->PJM
CBM
0.149
MECLTFEXP_MEC->PJM
CLTF
0.15
SIGELTFEXP_SIGE->PJM
CLTF
0.005
CBM NorthLTFEXP_CBM-N->PJM
CBM
0.584
CBM West 2LTFEXP_CBM-W2->PJM
CBM
0.793
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
CONTINGENCY 'AP_P2-3_PE-500-014_SRT-SL'
 DISCONNECT BRANCH FROM BUS 235103 TO BUS 964990 CKT 1          /*01BLACKO     500.0 - AG1-363 TP   500.0
 REDUCE BUS 235103 SHUNT BY 50 PERCENT                          /*01BLACKO     500.0
 SET POSTCONTRATING 2771 BRANCH FROM BUS 235101 TO BUS 235103 CKT 1 /*01BEDNGT     500.0 - 01BLACKO     500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235101 TO BUS 235103 CKT 1 /*01BEDNGT     500.0 - 01BLACKO     500.0
END
CONTINGENCY 'AP_P2-3_WP-500-DRT19_SRT-SL'
 OPEN BRANCH FROM BUS 235108 TO BUS 964990 CKT 1                /*01HATFLD     500.0 - AG1-363 TP   500.0
 SET POSTCONTRATING 3260 BRANCH FROM BUS 235108 TO BUS 235109 CKT 1 /*01HATFLD     500.0 - AB1-106 POI  500.0
 SET POSTCONTRATING 3260 BRANCH FROM BUS 235108 TO BUS 235774 CKT 1 /*01HATFLD     500.0 - 01RONCO      500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235108 TO BUS 235109 CKT 1 /*01HATFLD     500.0 - AB1-106 POI  500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235108 TO BUS 235774 CKT 1 /*01HATFLD     500.0 - 01RONCO      500.0
END
CONTINGENCY 'AP_P1-2_PE-500-004_SRT-SL-2'
 DISCONNECT BRANCH FROM BUS 964990 TO BUS 235103 CKT 1   /*AG1-363 TP   500.0 - 01BLACKO     500.0
END
CONTINGENCY 'AP_P1-2_PE-500-004_SRT-SL-1'
 DISCONNECT BRANCH FROM BUS 235108 TO BUS 964990 CKT 1   /*01HATFLD     500.0 - AG1-363 TP   500.0
END
CONTINGENCY 'AP_P7-1_PE-138-012A_SRT-A'
 DISCONNECT BRANCH FROM BUS 235468 TO BUS 235504 CKT 1   /*01FROSTB     138.0 - 01RIDGLY     138.0
 DISCONNECT BRANCH FROM BUS 235468 TO BUS 237317 CKT 1   /*01FROSTB     138.0 - 01FINZEL     138.0
 DISCONNECT BUS 235449                                   /*01CARLOS     138.0
END
CONTINGENCY 'AP_P2-2_WP-500-DRT9_SRT-SL'
 OPEN BRANCH FROM BUS 235774 TO BUS 235108 CKT 1                /*01RONCO      500.0 - 01HATFLD     500.0
 SET POSTCONTRATING 3260 BRANCH FROM BUS 235106 TO BUS 235774 CKT 1 /*01FMARTN     500.0 - 01RONCO      500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235106 TO BUS 235774 CKT 1 /*01FMARTN     500.0 - 01RONCO      500.0
END
CONTINGENCY 'AP_P2-3_WP-500-DRT22_SRT-SL'
 OPEN BRANCH FROM BUS 235108 TO BUS 235774 CKT 1                /*01HATFLD     500.0 - 01RONCO      500.0
 SET POSTCONTRATING 3260 BRANCH FROM BUS 235108 TO BUS 235109 CKT 1 /*01HATFLD     500.0 - AB1-106 POI  500.0
 SET POSTCONTRATING 3260 BRANCH FROM BUS 235108 TO BUS 964990 CKT 1 /*01HATFLD     500.0 - AG1-363 TP   500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235108 TO BUS 235109 CKT 1 /*01HATFLD     500.0 - AB1-106 POI  500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235108 TO BUS 964990 CKT 1 /*01HATFLD     500.0 - AG1-363 TP   500.0
END
CONTINGENCY 'AP_P2-3_MP-138-206_SRT-A'
 DISCONNECT BRANCH FROM BUS 235106 TO BUS 235774 CKT 1   /*01FMARTN     500.0 - 01RONCO      500.0
 DISCONNECT BRANCH FROM BUS 235108 TO BUS 235774 CKT 1   /*01HATFLD     500.0 - 01RONCO      500.0
 DISCONNECT BRANCH FROM BUS 235755 TO BUS 235774 CKT 1   /*01RONCO1      18.0 - 01RONCO      500.0
 DISCONNECT BRANCH FROM BUS 235756 TO BUS 235774 CKT 1   /*01RONCO2      18.0 - 01RONCO      500.0
 DISCONNECT BRANCH FROM BUS 235757 TO BUS 235774 CKT 1   /*01RONCO3      18.0 - 01RONCO      500.0
END
CONTINGENCY 'AP_P2-2_PE-138-021B_SRT-A'
 DISCONNECT BRANCH FROM BUS 235454 TO BUS 235504 CKT 1   /*01CUMBRL     138.0 - 01RIDGLY     138.0
 DISCONNECT BRANCH FROM BUS 235468 TO BUS 235504 CKT 1   /*01FROSTB     138.0 - 01RIDGLY     138.0
 DISCONNECT BRANCH FROM BUS 235484 TO BUS 235504 CKT 1   /*01MESSCK     138.0 - 01RIDGLY     138.0
 DISCONNECT BRANCH FROM BUS 235504 TO BUS 235526 CKT 1   /*01RIDGLY     138.0 - 01WR_AA1-100 138.0
 DISCONNECT BRANCH FROM BUS 235504 TO BUS 235593 CKT 1   /*01RIDGLY     138.0 - 01HAMPS53    138.0
 DISCONNECT BRANCH FROM BUS 235504 TO BUS 237498 CKT 1   /*01RIDGLY     138.0 - 01RIDGL#1     34.5
 DISCONNECT BRANCH FROM BUS 235504 TO BUS 237499 CKT 2   /*01RIDGLY     138.0 - 01RIDGL#2     34.5
 DISCONNECT BRANCH FROM BUS 237310 TO BUS 235504 CKT 1   /*01DANSMTN    138.0 - 01RIDGLY     138.0
 REDUCE BUS 235504 SHUNT BY 100 PERCENT                  /*01RIDGLY     138.0
END
CONTINGENCY 'AP_P7-1_MP-138-058_SRT-A'
 DISCONNECT BRANCH FROM BUS 235050 TO BUS 235501 CKT 1   /*01SULPHURCTY 138.0 - 01PARRN      138.0
 DISCONNECT BRANCH FROM BUS 235479 TO BUS 235501 CKT 1   /*01JUNCTN     138.0 - 01PARRN      138.0
 DISCONNECT BRANCH FROM BUS 237483 TO BUS 235501 CKT 2   /*01PARR RUN    34.5 - 01PARRN      138.0
END
CONTINGENCY 'AP_P2-4_MP-138-162_SRT-A'
 DISCONNECT BRANCH FROM BUS 235050 TO BUS 235501 CKT 1   /*01SULPHURCTY 138.0 - 01PARRN      138.0
 DISCONNECT BRANCH FROM BUS 235479 TO BUS 235501 CKT 1   /*01JUNCTN     138.0 - 01PARRN      138.0
 DISCONNECT BRANCH FROM BUS 237483 TO BUS 235501 CKT 2   /*01PARR RUN    34.5 - 01PARRN      138.0
END
CONTINGENCY 'AP_P2-3_PE-138-007_SRT-A'
 DISCONNECT BRANCH FROM BUS 235446 TO BUS 235558 CKT 1   /*01BLACKO     138.0 - 01SHORTG     138.0
 DISCONNECT BRANCH FROM BUS 235446 TO BUS 237506 CKT 1   /*01BLACKO     138.0 - 01CROSSCHOOL 138.0
 OPEN BRANCH FROM BUS 235446 TO BUS 235103 CKT 3         /*01BLACKO     138.0 - 01BLACKO     500.0
END
CONTINGENCY 'AP_P2-3_PE-500-018D_SRT-SL'
 DISCONNECT BRANCH FROM BUS 235101 TO BUS 235103 CKT 1          /*01BEDNGT     500.0 - 01BLACKO     500.0
 DISCONNECT BRANCH FROM BUS 235101 TO BUS 235445 CKT 2          /*01BEDNGT     500.0 - 01BEDNGT     138.0
 DISCONNECT BRANCH FROM BUS 235101 TO BUS 235445 CKT 4          /*01BEDNGT     500.0 - 01BEDNGT     138.0
 REDUCE BUS 235101 SHUNT BY 100 PERCENT                         /*01BEDNGT     500.0
 SET POSTCONTRATING 3260 BRANCH FROM BUS 235101 TO BUS 235105 CKT 1 /*01BEDNGT     500.0 - 01DOUBS      500.0
 SET POSTCONTRATING 459 BRANCH FROM BUS 235445 TO BUS 235101 CKT 1 /*01BEDNGT     138.0 - 01BEDNGT     500.0
 SET POSTCONTRATING 459 BRANCH FROM BUS 235445 TO BUS 235101 CKT 3 /*01BEDNGT     138.0 - 01BEDNGT     500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235101 TO BUS 235105 CKT 1 /*01BEDNGT     500.0 - 01DOUBS      500.0
 SET PRECONTRATING 459 BRANCH FROM BUS 235445 TO BUS 235101 CKT 1 /*01BEDNGT     138.0 - 01BEDNGT     500.0
 SET PRECONTRATING 459 BRANCH FROM BUS 235445 TO BUS 235101 CKT 3 /*01BEDNGT     138.0 - 01BEDNGT     500.0
END
CONTINGENCY 'AP_P2-3_PE-500-018C_SRT-SL'
 DISCONNECT BRANCH FROM BUS 235101 TO BUS 235103 CKT 1          /*01BEDNGT     500.0 - 01BLACKO     500.0
 DISCONNECT BRANCH FROM BUS 235101 TO BUS 235445 CKT 1          /*01BEDNGT     500.0 - 01BEDNGT     138.0
 DISCONNECT BRANCH FROM BUS 235101 TO BUS 235445 CKT 3          /*01BEDNGT     500.0 - 01BEDNGT     138.0
 SET POSTCONTRATING 3260 BRANCH FROM BUS 235101 TO BUS 235105 CKT 1 /*01BEDNGT     500.0 - 01DOUBS      500.0
 SET POSTCONTRATING 459 BRANCH FROM BUS 235445 TO BUS 235101 CKT 2 /*01BEDNGT     138.0 - 01BEDNGT     500.0
 SET POSTCONTRATING 459 BRANCH FROM BUS 235445 TO BUS 235101 CKT 4 /*01BEDNGT     138.0 - 01BEDNGT     500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235101 TO BUS 235105 CKT 1 /*01BEDNGT     500.0 - 01DOUBS      500.0
 SET PRECONTRATING 459 BRANCH FROM BUS 235445 TO BUS 235101 CKT 2 /*01BEDNGT     138.0 - 01BEDNGT     500.0
 SET PRECONTRATING 459 BRANCH FROM BUS 235445 TO BUS 235101 CKT 4 /*01BEDNGT     138.0 - 01BEDNGT     500.0
END
CONTINGENCY 'AP_P2-3_PE-500-016_SRT-SL'
 DISCONNECT BRANCH FROM BUS 235101 TO BUS 235103 CKT 1          /*01BEDNGT     500.0 - 01BLACKO     500.0
 DISCONNECT BRANCH FROM BUS 235446 TO BUS 235103 CKT 3          /*01BLACKO     138.0 - 01BLACKO     500.0
 REDUCE BUS 235103 SHUNT BY 50 PERCENT                          /*01BLACKO     500.0
 SET POSTCONTRATING 2771 BRANCH FROM BUS 235103 TO BUS 964990 CKT 1 /*01BLACKO     500.0 - AG1-363 TP   500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235103 TO BUS 964990 CKT 1 /*01BLACKO     500.0 - AG1-363 TP   500.0
END
CONTINGENCY 'AP_P2-3_PE-500-015_SRT-A'
 DISCONNECT BRANCH FROM BUS 235101 TO BUS 235103 CKT 1   /*01BEDNGT     500.0 - 01BLACKO     500.0
 DISCONNECT BRANCH FROM BUS 235103 TO BUS 964990 CKT 1   /*01BLACKO     500.0 - AG1-363 TP   500.0
END
CONTINGENCY 'AP_P1-2_PE-500-001_SRT-SL'
 DISCONNECT BRANCH FROM BUS 235101 TO BUS 235103 CKT 1          /*01BEDNGT     500.0 - 01BLACKO     500.0
 SET POSTCONTRATING 3260 BRANCH FROM BUS 235101 TO BUS 235105 CKT 1 /*01BEDNGT     500.0 - 01DOUBS      500.0
 SET PRECONTRATING 2707 BRANCH FROM BUS 235101 TO BUS 235105 CKT 1 /*01BEDNGT     500.0 - 01DOUBS      500.0
END
CONTINGENCY 'AP_P1-2_WP-500-DRT17_SRT-SL'
 OPEN BRANCH FROM BUS 235103 TO BUS 235101 CKT 1   /*01BLACKO     500.0 - 01BEDNGT     500.0
END
235550 to 237506 ckt 1
235446 to 235103 ckt 3
235449 to 237310 ckt 1
237506 to 235446 ckt 1
235490 to 235453 ckt 1
970994 to 235449 ckt 1

Winter Peak Analysis

The New Service Request AG2-448 was evaluated as a 50.0 MW (30.0 MW Capacity) injection in the APS area.

AG2-448 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 50.0 MW (50.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Light Load Analysis

The New Service Request AG2-448 was evaluated as a 50.0 MW injection

AG2-448 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 50.0 MW (50.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Short Circuit Analysis

Short Circuit analysis is not performed as part of the Phase I System Impact Study. Short Circuit analysis will commence in the Phase II System Impact Study.

Stability Analysis

Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.

Reactive Power Analysis

Reactive Power analysis is not performed as part of the Phase I System Impact Study. Reactive Power analysis will commence in the Phase II System Impact Study.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AA1-095Halfway-Marlowe 34.5kVIn Service
AB1-127St. Thomas-Guilford 34.5kVIn Service
AB1-128St. Thomas-Mercersburg 34.5kVIn Service
AD1-060Mercersburg-Milnor 34.5 kVIn Service
AD1-061McConnelsburg-Mercersburg 34 kVIn Service
AD1-125Baker 138 kVSuspended
AD2-009McConnellsburg 138 kVIn Service
AD2-180Elk Garden-Parr Run 138kVIn Service
AE1-101McConnellsburg-Texas Eastern 138 kVIn Service
AE1-106Lake Lynn-Hazelton 138 kVSuspended
AE1-109Frenchs Mill 34 kVIn Service
AE2-054Warfordsburg 34 kVIn Service
AE2-289Frostburg 138 kVPending
AE2-309Carlos Junction-Lonaconing 34.5 kVIn Service
AF1-039Listonburg-Highpoint 24.9 kVIn Service
AF1-136Warfordsburg-Purcell Junction 34.5 kVEngineering & Procurement
AF1-143Lick Run 115 kVEngineering & Procurement
AF1-254Milnor-Huyetts 34.5 kVUnder Construction
AF2-356Albright-Mt. Zion 138 kVUnder Construction
AG1-363Black Oak-Hatfield 500 kVEngineering & Procurement
AG2-062William 138 kVActive
AG2-505Westvaco - Mt Zion 138 kVActive
AG2-582Flint Run 500 kVActive
AG2-615Carlos Junction-Garrett 138 kVActive
AH1-203Allegheny-Somerset 115 kVActive
AH1-340Cheat Lake-Ruthbelle 138 kVActive
U2-030Four Mile Ridge Wind 138kVIn Service
U2-073Frostburg 138kV IIIn Service
Y1-033Penn Mar-Rock Wood 115kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with potential Affected System impacts. PJM initiates coordination with each Affected System Operator by providing a list of New Service Requests in the Cycle with potential impacts to their respective system. If the Affected System Operator indicates an Affected System Study is required, PJM will notify the Project Developer or Eligible Customer of the need for an Affected System Study. See below if any Affected System Operator requires a study for this project:

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Phase I analysis results, this project may have a cost responsibility for the following System Reinforcements:

AG2-448 System Reinforcements:
TORTEP IDTitleAllocated Cost ($USD)
APS(Pending) / TC2-APS-019.aReconductor (Possible Rebuild) 8.6 miles of Black Oak - Cross School transmission line$20,964,865
APS(Pending) / TC2-APS-023.bReconductor (Possible Rebuild) ~1 mile of Beryl - Cross School 138 kV transmission line.$2,642,052
APS(Pending) / TC2-APS-019.bUpgrade/Update (3) 8 amp KC-4 (50FD) Relay at Black Oak$683,304
APS(Pending) / TC2-PH1-019.cUpgrade SEL-321 (21/67NP-BLACK OAK) relay at Cross School$394,830
APS(Pending) / TC2-PH1-019.dUpgrade/Update 2 relays at Black Oak (KD-11 Zone 3 & KD-10 Zone 2)$394,830
APS(Pending) / TC2-PH1-023.aUpgrade 138 kV Disc Sw 1306_Q at Beryl$230,361
Grand Total:$25,310,242

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-019.a
Title
Reconductor (Possible Rebuild) 8.6 miles of Black Oak - Cross School transmission line
Description
Reconductor (Possible Rebuild) 8.6 miles of Black Oak - Cross School transmission line
Total Cost ($USD)
$31,323,166
Allocated Cost ($USD)
$20,964,865
Time Estimate
41 Months

Contributor

FacilityContingency
01BLACKO-01CROSSCHOOL 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-448
29.9 MW66.9%$20,964,865
AG2-505
8.7 MW19.5%$6,109,785
AG2-615
6.1 MW13.6%$4,248,516

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-023.b
Title
Reconductor (Possible Rebuild) ~1 mile of Beryl - Cross School 138 kV transmission line.
Description
Reconductor (Possible Rebuild) ~1 mile of Beryl - Cross School 138 kV transmission line.
Total Cost ($USD)
$4,427,958
Allocated Cost ($USD)
$2,642,052
Time Estimate
18 Months

Contributor

FacilityContingency
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-448
29.9 MW59.7%$2,642,052
AG2-505
8.7 MW17.4%$769,895
AG2-582
11.5 MW22.9%$1,016,011

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-019.b
Title
Upgrade/Update (3) 8 amp KC-4 (50FD) Relay at Black Oak
Description
Upgrade/Update (3) 8 amp KC-4 (50FD) Relay at Black Oak
Total Cost ($USD)
$882,439
Allocated Cost ($USD)
$683,304
Time Estimate
19 Months

Contributor

FacilityContingency
01BLACKO-01CROSSCHOOL 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-448
29.9 MW77.4%$683,304
AG2-505
8.7 MW22.6%$199,135

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-PH1-019.c
Title
Upgrade SEL-321 (21/67NP-BLACK OAK) relay at Cross School
Description
Upgrade SEL-321 (21/67NP-BLACK OAK) relay at Cross School
Total Cost ($USD)
$509,895
Allocated Cost ($USD)
$394,830
Time Estimate
18 Months

Contributor

FacilityContingency
01BLACKO-01CROSSCHOOL 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-448
29.9 MW77.4%$394,830
AG2-505
8.7 MW22.6%$115,065

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-PH1-019.d
Title
Upgrade/Update 2 relays at Black Oak (KD-11 Zone 3 & KD-10 Zone 2)
Description
Upgrade/Update 2 relays at Black Oak (KD-11 Zone 3 & KD-10 Zone 2)
Total Cost ($USD)
$509,895
Allocated Cost ($USD)
$394,830
Time Estimate
18 Months

Contributor

FacilityContingency
01BLACKO-01CROSSCHOOL 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-448
29.9 MW77.4%$394,830
AG2-505
8.7 MW22.6%$115,065

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-PH1-023.a
Title
Upgrade 138 kV Disc Sw 1306_Q at Beryl
Description
Upgrade 138 kV Disc Sw 1306_Q at Beryl
Total Cost ($USD)
$432,790
Allocated Cost ($USD)
$230,361
Time Estimate
19 Months

Contributor

FacilityContingency
01BERYL-01CROSSCHOOL 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-448
29.9 MW53.2%$230,361
AG2-505
8.7 MW15.5%$67,127
AG2-582
11.5 MW20.5%$88,586
AG2-615
6.1 MW10.8%$46,716

System Reinforcement: b4000.11
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.11
Title
Expand Black Oak Substation & Loop in the 502 Jct-Woodside 500 kV line (Projected ISD 6/1/2029)
Description
Expand Black Oak Substation to accommodate the connection of the 502 Jct-Woodside 500 kV line and loop the 502 Jct-Woodside 500 kV line into the Black Oak substation by constructing ~0.85 miles of new 500 kV line into and out of Black Oak 500 kV substation
Cost Information
Time Estimate
Jun 01 2029

Contingent

Note: Although AG2-448 may not presently have cost responsibility for this upgrade, AG2-448 may need this upgrade in-service to be deliverable to the PJM system. If AG2-448 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
01BLACKO-01BLACKO 500.0/138.0 kV Ckt 3 transformer(Any)

System Reinforcement: s3713.1
Type
Load Flow
TO
APS
RTEP ID / TO ID
s3713.1 / APS-2025-018
Title
Terminal Equipment Upgrades at Black Oak & Cross School - Misoperation Relay Project (Supplemental - Projected ISD 12/31/2026)
Description
- At Black Oak, replace circuit breakers, disconnect switches, line trap, CCVT and line relaying. - At Cross School, replace line trap and line relaying. Presented at Jul 2025 SRRTEP: https://www.pjm.com/-/media/DotCom/committees-groups/committees/srrtep-w/2025/20250718/20250718-item-02---aps-supplemental-projects.pdf
Cost Information
Time Estimate
Dec 31 2026

Contingent

Note: Although AG2-448 may not presently have cost responsibility for this upgrade, AG2-448 may need this upgrade in-service to be deliverable to the PJM system. If AG2-448 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
01BLACKO-01CROSSCHOOL 138.0 kV Ckt 1 line(Any)

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-021
Title
Replace 138 kV Disc Switch at Carlos Jct T
Description
Replace 138 kV Disc Switch at Carlos Jct T
Total Cost ($USD)
$432,790
Allocated Cost ($USD)
$0
Time Estimate
19 Months

Contingent

Note: Based on PJM cost allocation criteria, AG2-448 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-448 could receive cost allocation. Although AG2-448 may not presently have cost responsibility for this upgrade, AG2-448 may need this upgrade in-service to be deliverable to the PJM system. If AG2-448 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
01CARLOS-01DANSMTN 138.0 kV Ckt 1 line(Any)

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-001.a
Title
Upgrade 138 kV Carlos DS A-18
Description
Upgrade 138 kV Carlos DS A-18
Total Cost ($USD)
$432,791
Allocated Cost ($USD)
$0
Time Estimate
21 Months

Contingent

Note: Based on PJM cost allocation criteria, AG2-448 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-448 could receive cost allocation. Although AG2-448 may not presently have cost responsibility for this upgrade, AG2-448 may need this upgrade in-service to be deliverable to the PJM system. If AG2-448 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
01CARLOS-AG2-615 TP 138.0 kV Ckt 1 line(Any)

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-033
Title
Reconductor Cherry Run - Morgan 138 kV transmission line
Description
Reconductor (Possible Rebuild) ~7.9 miles of Cherry Run - Morgan 138 kV transmission line
Total Cost ($USD)
$92,496,484
Allocated Cost ($USD)
$0
Time Estimate
47 Months

Contingent

Note: Based on PJM cost allocation criteria, AG2-448 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-448 could receive cost allocation. Although AG2-448 may not presently have cost responsibility for this upgrade, AG2-448 may need this upgrade in-service to be deliverable to the PJM system. If AG2-448 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
01CHERYR-01MORGAN 138.0 kV Ckt 1 line(Any)

System Reinforcement: s3712.1
Type
Load Flow
TO
APS
RTEP ID / TO ID
s3712.1 / APS-2024-047
Title
Terminal Equipment Upgrades at Morgan & Cherry Run - Misoperation Relay Project (Projected ISD 7/21/2029)
Description
- At Morgan, replace disconnect switches, line trap, substation conductor and line relaying. - At Cherry Run, replace circuit breaker, line trap, substation conductor and line relaying. Presented at Jul 2025 SRRTEP: https://www.pjm.com/-/media/DotCom/committees-groups/committees/srrtep-w/2025/20250718/20250718-item-02---aps-supplemental-projects.pdf
Cost Information
Time Estimate
Jul 21 2029

Contingent

Note: Although AG2-448 may not presently have cost responsibility for this upgrade, AG2-448 may need this upgrade in-service to be deliverable to the PJM system. If AG2-448 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
01CHERYR-01MORGAN 138.0 kV Ckt 1 line(Any)

Attachments

AG2-448 One Line Diagram

AG2-448 One Line Diagram.pdf
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.