AG2-675 Phase I Study Report

v1.00 released 2025-10-29 20:36

Cordova 345 kV

32.0 MW Capacity / 80.0 MW Energy

Introduction

This Phase I System Impact Study Report (PH1) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, sections 307 and 308 for New Service Requests (projects) in Transition Cycle 2. The Project Developer/Eligible Customer (developer) is Gipper Solar Farm, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Commonwealth Edison Company.

Preface

The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
  1. PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
  2. PJM will only perform load flow analysis during the Phase I System Impact Study.
  3. In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with Affected System impacts and provides each Affected System Operator with a list of New Service Request in the Cycle with potential impacts to their respective system.
  4. PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
  5. The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase I System Impact Study:
  1. Identify required Interconnection Facilities to accommodate the New Service Request.
  2. Identify required Network Upgrades to mitigate system violations from the Phase I System Impact Study.
  3. Provide planning-level preliminary estimates of Interconnection Facilities and Network Upgrades including scope, cost and elapsed time to complete the work.

Decision Point I Requirements

At the close of Phase I System Impact Study, PJM will initiate Decision Point I (DP1). During DP1, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.A.1. Additional information on these elements is available in PJM Manual 14H sections 4.4, 6, and 7.

Allowable project modifications at Decision Point I are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

General

The Project Developer has proposed an uprate to a planned/existing Solar facility located in the Commonwealth Edison Company zone — Rock Island County, Illinois. This project is an increase to the developer’s AG1-462 project(s), which will share the same Point of Interconnection. The AG2-675 project is a 80.0 MW uprate (32.0 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 335.0 MW with 185.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG2-675
Project Name:
Cordova 345 kV
Project Developer Name:
Gipper Solar Farm, LLC
State:
Illinois
County:
Rock Island
Transmission Owner:
Commonwealth Edison Company
MFO:
335.0
MWE:
80.0
MWC:
32.0
Battery Storage Specification:
320.0 MWh, 4.0-hr class
Grid Charging:
Yes
Fuel Type:
Storage
Basecase Study Year:
2028

Physical Interconnection Facility Study

Physical Interconnection Facilities Study is not performed as part of the Phase I System Impact Study. Physical Interconnection Facilities Study will commence in the Phase II System Impact Study.

Point of Interconnection

AG2-675 will interconnect on the Commonwealth Edison Company  transmission system at the Cordova 345 kv substation.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In the Phase I SIS, the costs shown are subject to change as a result of a facility study performed by the TO during the Phase II or Phase III System Impact Study.

Based on the Phase I SIS results, the AG2-675 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit are also shown below.

Cost Summary
DescriptionCost Allocated to AG2-675Cost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF)$0$0
Other Scope$350,000$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0
Network Upgrades$0$0
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$0$0
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$350,000$0

* Contributes to calculation for Readiness Deposit #2 (RD2). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 309 (Decision Point I) A.1.a.i and PJM Manual 14H, section 6.2, Readiness Deposit #2 (RD2) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point I (DP1), the Project Developer or Eligible Customer is required to submit Readiness Deposit #2, which is calculated as 10% of cost allocation for required Phase I Network Upgrades minus Readiness Deposit #1.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Readiness Deposit #2 Due for Project AG2-675

Readiness Deposit #2 has been calculated for the project based on the Phase I System Impact Study results and is shown in the table below. This Readiness Deposit #2 must be provided at Decision Point I through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID10% of cost allocation for Phase I Network UpgradesReadiness Deposit #1 Received (RD1)Readiness Deposit #2 (RD2) for AG2-675 Project due at DP1
ABA - B
AG2-675$0$320,000$0

Note: Failure to provide an acceptable form of Readiness Deposit #2 by the end of Decision Point I will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

If your project relies on Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and/or Network Upgrades that will be constructed by another New Service Request and the other New Service Request withdraws, the scope and costs will be allocated to your project, unless the Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and/or applicable Network Upgrades have been securitized in an ISA/GIA. 

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Physical Interconnection
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)SCADA, Relay and Comm' review/updates.$350,000 $350,000

Based on the scope of work for the Interconnection Facilities, it is expected to take a range of 12 to 15 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.

Notes on Cost Estimate:

  1. These estimates are order-of-magnitude estimates of the costs that ComEd would bill to the Project Developer for this interconnection. These estimates are based on a one-line electrical diagram of the project and the information provided by the Project Developer.
  2. There were no site visits performed for these estimates. There may be costs related to specific site related issues that are not identified in these estimates. The site reviews will be performed during the Facilities Study or during detailed engineering.
  3. These estimates are not a guarantee of the maximum amount payable by the Project Developer and the actual costs of ComEd's work may differ significantly from these estimates. The Project Developer will be responsible for paying actual costs of ComEd's work in accordance with the PJM Open Access Transmission Tariff.
  4. The Project Developer is responsible for all engineering, procurement, testing and construction of all equipment on the Project Developer’s side of the Point of Change in Ownership.

 

 

Transmission Owner Analysis

No Transmission Owner impacts identified.

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. ComEd interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AG2-675 was evaluated as a 80.0 MW (32.0 MW Capacity) injection in the ComEd area.

AG2-675 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 335.0 MW (80.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P4_144-45-BT5-8___SRT-A
BreakerAC116.91 %1837.0STE2147.616.08
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P4_006-45-BT3-8___SRT-A
BreakerAC116.25 %1837.0STE2135.597.55
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P4_006-45-BT3-4___SRT-A
BreakerAC115.97 %1837.0STE2130.287.52
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P4_144-45-BT7-8___SRT-A
BreakerAC115.82 %1837.0STE2127.566.11
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P4-6_006-345-BT78___SRT-A
BreakerAC115.12 %1837.0STE2114.816.34
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Base Case
SingleAC113.9 %1334.0A1519.445.56
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P2-2_141_PV-138R__1_SRT-A
BusAC101.14 %1837.0STE1858.035.6
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P2-2_154_LV-345R__3_SRT-A
BusAC101.06 %1837.0STE1856.545.59
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P2-2_116_GG-345R__2_SRT-A
BusAC101.04 %1837.0STE1856.045.59
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P2-2_116_GG-345B__4_SRT-A
BusAC100.99 %1837.0STE1855.195.58
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P2-2_951_AR-345R__3_SRT-A
BusAC100.85 %1837.0STE1852.65.58
GD2CE
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
COMED_P4-6_111-345-B______SRT-A
BreakerAC101.74 %1837.0STE1869.058.07
GD2CE
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
COMED_P2-2_111_EJ-345B__1_SRT-A
BusAC101.1 %1837.0STE1857.248.25
GD2CE
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
COMED_P4_111-45-TR81____SRT-A
BreakerAC101.09 %1837.0STE1857.098.25
GD2CE
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
COMED_P4_111-45-L11124__SRT-A
BreakerAC101.09 %1837.0STE1857.098.25

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P4_144-45-BT5-8___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_144-45-BT5-8___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:116.91 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:2147.61
MW Contribution:6.08
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
21.136
274848CAMPGROVE;RU
Solar/Wind Harmer
4.538
274767LEE CO EC;8U
50/50
17.928
959091AF2-200 GEN
Solar/Wind Harmer
93.489
971087AG2-675 GEN
50/50
6.084
957471AF2-041 GEN
Solar/Wind Harmer
140.233
274877BISHOP HL;1U
Solar/Wind Harmer
2.674
971341AH1-150 GEN
Solar/Wind Harmer
93.489
971343AH1-151 GEN
Solar/Wind Harmer
93.489
276741O09 GEN1
Solar/Wind Harmer
6.076
274849CRESCENT ;1U
Solar/Wind Harmer
1.189
971171AH1-044 GEN
Solar/Wind Harmer
93.489
946321AF1-296 GEN
Solar/Wind Harmer
16.776
274823ROCKFORD ;21
Adder
18.094
971675AH1-338 GEN
Solar/Wind Harmer
13.203
971411AH1-196 GEN
Solar/Wind Harmer
9.686
274716NELSON EC;1S
50/50
1.832
274855GSG-6 ;RU
Solar/Wind Harmer
2.756
274766LEE CO EC;7U
50/50
17.928
274857EASY ROAD;U1
Solar/Wind Harmer
8.806
972235AH1-702 GEN1
Adder
3.082
972267AH1-718 GEN
50/50
9.905
274764LEE CO EC;5U
50/50
18.185
276708O09 GEN2
Solar/Wind Harmer
6.076
971335AH1-147 GEN
Solar/Wind Harmer
24.433
276782AC1-033 GEN
Solar/Wind Harmer
3.161
971681AH1-341 GEN
Solar/Wind Harmer
22.439
276612AE2-035 GEN
Solar/Wind Harmer
3.01
957751AF2-069 GEN
Solar/Wind Harmer
0.295
971177AH1-047 GEN
Solar/Wind Harmer
2.75
274858EASY ROAD;U2
Solar/Wind Harmer
8.806
276157O29GEN1
Solar/Wind Harmer
6.47
274850MENDOTA H;RU
Solar/Wind Harmer
1.916
276602WESTBROOK C
Solar/Wind Harmer
1.586
276863AD2-134 GEN
Solar/Wind Harmer
1.333
276799AD1-013 GEN
Solar/Wind Harmer
1.587
946671AF1-331 GEN
Solar/Wind Harmer
0.301
274761LEE CO EC;2U
50/50
18.142
276158O29GEN2
Solar/Wind Harmer
8.506
276861AD2-134 GEN
Solar/Wind Harmer
1.333
274762LEE CO EC;3U
50/50
18.142
276603SUBLETTE C
Solar/Wind Harmer
1.79
938861AE1-114 GEN
Solar/Wind Harmer
11.981
274856ECOGROVE ;U1
Solar/Wind Harmer
3.967
276611AD2-172 GEN
Solar/Wind Harmer
3.01
276645AC1-214 GEN1
Solar/Wind Harmer
0.861
274715NELSON EC;1C
50/50
2.51
274760LEE CO EC;1U
50/50
18.142
965931AG1-462 GEN
Solar/Wind Harmer
41.695
972236AH1-702 GEN2
Adder
2.671
274878BISHOP HL;2U
Solar/Wind Harmer
2.674
959081AF2-199 GEN
Solar/Wind Harmer
46.744
971067AG2-660 GEN
Solar/Wind Harmer
10.871
970819AG2-516 GEN
Solar/Wind Harmer
12.631
971475AH1-234 GEN
Solar/Wind Harmer
21.981
274822ROCKFORD ;11
Adder
18.224
274717NELSON EC;2C
50/50
2.51
274718NELSON EC;2S
50/50
1.832
274765LEE CO EC;6U
50/50
18.185
274763LEE CO EC;4U
50/50
17.971
971333AH1-146 GEN
Solar/Wind Harmer
24.433
274851PROVIDENC;RU
Solar/Wind Harmer
1.831
276646AC1-214 GEN2
Solar/Wind Harmer
0.861
942991AE2-321 GEN
Solar/Wind Harmer
4.451
990512J1326
External Queue
4.585575580596924
991092J1477
External Queue
5.850008010864258
990407J1304
External Queue
3.37416672706604
990117J1214
External Queue
15.774378776550293
990727J1377 G
External Queue
5.941872596740723
CBM West 1LTFEXP_CBM-W1->PJM
CBM
55.835
NYPJM->LTFIMP_NY
CLTF
0.233
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.08
SIGELTFEXP_SIGE->PJM
CLTF
0.016
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.881
TVALTFEXP_TVA->PJM
CLTF
1.218
LAGNLTFEXP_LAGN->PJM
CLTF
4.253
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.728
CPLELTFEXP_CPLE->PJM
CLTF
0.155
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.184
CBM West 2LTFEXP_CBM-W2->PJM
CBM
23.368
WECLTFEXP_WEC->PJM
CLTF
1.067
MECLTFEXP_MEC->PJM
CLTF
13.927

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P4_006-45-BT3-8___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_006-45-BT3-8___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:116.25 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:2135.59
MW Contribution:7.55
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
26.072
274848CAMPGROVE;RU
Solar/Wind Harmer
5.737
274767LEE CO EC;8U
50/50
27.967
959091AF2-200 GEN
Solar/Wind Harmer
101.024
971087AG2-675 GEN
50/50
7.547
957471AF2-041 GEN
Solar/Wind Harmer
151.536
274877BISHOP HL;1U
Solar/Wind Harmer
3.373
971341AH1-150 GEN
Solar/Wind Harmer
101.024
971343AH1-151 GEN
Solar/Wind Harmer
101.024
276741O09 GEN1
Solar/Wind Harmer
7.593
274849CRESCENT ;1U
Solar/Wind Harmer
1.513
971171AH1-044 GEN
Solar/Wind Harmer
101.024
946321AF1-296 GEN
Solar/Wind Harmer
20.561
971675AH1-338 GEN
Solar/Wind Harmer
13.4
274716NELSON EC;1S
50/50
2.343
274855GSG-6 ;RU
Solar/Wind Harmer
2.809
274766LEE CO EC;7U
50/50
27.967
274857EASY ROAD;U1
Solar/Wind Harmer
13.738
972267AH1-718 GEN
50/50
12.669
274764LEE CO EC;5U
50/50
28.367
276708O09 GEN2
Solar/Wind Harmer
7.593
276782AC1-033 GEN
Solar/Wind Harmer
3.987
971681AH1-341 GEN
Solar/Wind Harmer
22.695
957751AF2-069 GEN
Solar/Wind Harmer
0.376
276612AE2-035 GEN
Solar/Wind Harmer
1.832
274858EASY ROAD;U2
Solar/Wind Harmer
13.738
276157O29GEN1
Solar/Wind Harmer
8.086
274850MENDOTA H;RU
Solar/Wind Harmer
1.953
276602WESTBROOK C
Solar/Wind Harmer
1.617
276863AD2-134 GEN
Solar/Wind Harmer
1.359
276799AD1-013 GEN
Solar/Wind Harmer
1.601
946671AF1-331 GEN
Solar/Wind Harmer
0.303
274761LEE CO EC;2U
50/50
28.301
276158O29GEN2
Solar/Wind Harmer
10.63
276861AD2-134 GEN
Solar/Wind Harmer
1.359
274762LEE CO EC;3U
50/50
28.301
276603SUBLETTE C
Solar/Wind Harmer
2.095
938861AE1-114 GEN
Solar/Wind Harmer
11.344
276645AC1-214 GEN1
Solar/Wind Harmer
1.096
274856ECOGROVE ;U1
Solar/Wind Harmer
2.414
276611AD2-172 GEN
Solar/Wind Harmer
1.832
274715NELSON EC;1C
50/50
3.21
274760LEE CO EC;1U
50/50
28.301
965931AG1-462 GEN
Solar/Wind Harmer
51.719
274878BISHOP HL;2U
Solar/Wind Harmer
3.373
959081AF2-199 GEN
Solar/Wind Harmer
50.512
971067AG2-660 GEN
Solar/Wind Harmer
11.747
274717NELSON EC;2C
50/50
3.21
274718NELSON EC;2S
50/50
2.343
274765LEE CO EC;6U
50/50
28.367
274763LEE CO EC;4U
50/50
28.034
274851PROVIDENC;RU
Solar/Wind Harmer
2.33
276646AC1-214 GEN2
Solar/Wind Harmer
1.096
991092J1477
External Queue
7.600969314575195
991303J1755 G
External Queue
3.895651340484619
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.393
CPLELTFEXP_CPLE->PJM
CLTF
0.324
SIGELTFEXP_SIGE->PJM
CLTF
0.025
CBM South 1LTFEXP_CBM-S1->PJM
CBM
4.667
WECLTFEXP_WEC->PJM
CLTF
0.186
LAGNLTFEXP_LAGN->PJM
CLTF
4.933
CBM West 2LTFEXP_CBM-W2->PJM
CBM
27.97
LGEELTFEXP_LGEE->PJM
CLTF
0.078
MECLTFEXP_MEC->PJM
CLTF
15.327
CBM West 1LTFEXP_CBM-W1->PJM
CBM
49.433
NYPJM->LTFIMP_NY
CLTF
0.17
TVALTFEXP_TVA->PJM
CLTF
1.491

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P4_006-45-BT3-4___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_006-45-BT3-4___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:115.97 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:2130.28
MW Contribution:7.52
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
25.989
274848CAMPGROVE;RU
Solar/Wind Harmer
5.719
274767LEE CO EC;8U
50/50
27.908
959091AF2-200 GEN
Solar/Wind Harmer
100.995
971087AG2-675 GEN
50/50
7.519
957471AF2-041 GEN
Solar/Wind Harmer
151.492
274877BISHOP HL;1U
Solar/Wind Harmer
3.363
971341AH1-150 GEN
Solar/Wind Harmer
100.995
971343AH1-151 GEN
Solar/Wind Harmer
100.995
276741O09 GEN1
Solar/Wind Harmer
7.571
274849CRESCENT ;1U
Solar/Wind Harmer
1.508
971171AH1-044 GEN
Solar/Wind Harmer
100.995
946321AF1-296 GEN
Solar/Wind Harmer
20.477
971675AH1-338 GEN
Solar/Wind Harmer
13.286
274716NELSON EC;1S
50/50
2.338
274855GSG-6 ;RU
Solar/Wind Harmer
2.786
274766LEE CO EC;7U
50/50
27.908
274857EASY ROAD;U1
Solar/Wind Harmer
13.709
972267AH1-718 GEN
50/50
12.643
274764LEE CO EC;5U
50/50
28.308
276708O09 GEN2
Solar/Wind Harmer
7.571
276782AC1-033 GEN
Solar/Wind Harmer
3.975
971681AH1-341 GEN
Solar/Wind Harmer
22.508
957751AF2-069 GEN
Solar/Wind Harmer
0.375
276612AE2-035 GEN
Solar/Wind Harmer
1.758
274858EASY ROAD;U2
Solar/Wind Harmer
13.709
276157O29GEN1
Solar/Wind Harmer
8.063
274850MENDOTA H;RU
Solar/Wind Harmer
1.937
276602WESTBROOK C
Solar/Wind Harmer
1.604
276863AD2-134 GEN
Solar/Wind Harmer
1.347
276799AD1-013 GEN
Solar/Wind Harmer
1.588
946671AF1-331 GEN
Solar/Wind Harmer
0.301
274761LEE CO EC;2U
50/50
28.241
276158O29GEN2
Solar/Wind Harmer
10.6
276861AD2-134 GEN
Solar/Wind Harmer
1.347
274762LEE CO EC;3U
50/50
28.241
276603SUBLETTE C
Solar/Wind Harmer
2.085
938861AE1-114 GEN
Solar/Wind Harmer
11.187
276645AC1-214 GEN1
Solar/Wind Harmer
1.093
274856ECOGROVE ;U1
Solar/Wind Harmer
2.318
276611AD2-172 GEN
Solar/Wind Harmer
1.758
274715NELSON EC;1C
50/50
3.203
274760LEE CO EC;1U
50/50
28.241
965931AG1-462 GEN
Solar/Wind Harmer
51.527
274878BISHOP HL;2U
Solar/Wind Harmer
3.363
959081AF2-199 GEN
Solar/Wind Harmer
50.497
971067AG2-660 GEN
Solar/Wind Harmer
11.744
274717NELSON EC;2C
50/50
3.203
274718NELSON EC;2S
50/50
2.338
274765LEE CO EC;6U
50/50
28.308
274763LEE CO EC;4U
50/50
27.975
274851PROVIDENC;RU
Solar/Wind Harmer
2.323
276646AC1-214 GEN2
Solar/Wind Harmer
1.093
991092J1477
External Queue
7.591790199279785
991303J1755 G
External Queue
3.9269304275512695
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.376
CPLELTFEXP_CPLE->PJM
CLTF
0.319
SIGELTFEXP_SIGE->PJM
CLTF
0.025
CBM South 1LTFEXP_CBM-S1->PJM
CBM
4.62
WECLTFEXP_WEC->PJM
CLTF
0.136
LAGNLTFEXP_LAGN->PJM
CLTF
4.883
CBM West 2LTFEXP_CBM-W2->PJM
CBM
27.712
LGEELTFEXP_LGEE->PJM
CLTF
0.076
MECLTFEXP_MEC->PJM
CLTF
15.168
CBM West 1LTFEXP_CBM-W1->PJM
CBM
48.216
NYPJM->LTFIMP_NY
CLTF
0.169
TVALTFEXP_TVA->PJM
CLTF
1.476

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P4_144-45-BT7-8___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_144-45-BT7-8___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:115.82 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:2127.56
MW Contribution:6.11
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
21.205
274848CAMPGROVE;RU
Solar/Wind Harmer
4.554
274767LEE CO EC;8U
50/50
17.943
959091AF2-200 GEN
Solar/Wind Harmer
94.055
971087AG2-675 GEN
50/50
6.107
957471AF2-041 GEN
Solar/Wind Harmer
141.082
274877BISHOP HL;1U
Solar/Wind Harmer
2.683
971341AH1-150 GEN
Solar/Wind Harmer
94.055
971343AH1-151 GEN
Solar/Wind Harmer
94.055
276741O09 GEN1
Solar/Wind Harmer
6.097
274849CRESCENT ;1U
Solar/Wind Harmer
1.193
971171AH1-044 GEN
Solar/Wind Harmer
94.055
946321AF1-296 GEN
Solar/Wind Harmer
16.837
274823ROCKFORD ;21
Adder
17.883
971675AH1-338 GEN
Solar/Wind Harmer
13.36
971411AH1-196 GEN
Solar/Wind Harmer
9.2
274716NELSON EC;1S
50/50
1.839
274855GSG-6 ;RU
Solar/Wind Harmer
2.788
274766LEE CO EC;7U
50/50
17.943
274857EASY ROAD;U1
Solar/Wind Harmer
8.814
972235AH1-702 GEN1
Adder
3.06
972267AH1-718 GEN
50/50
9.941
274764LEE CO EC;5U
50/50
18.199
276708O09 GEN2
Solar/Wind Harmer
6.097
971335AH1-147 GEN
Solar/Wind Harmer
24.264
276782AC1-033 GEN
Solar/Wind Harmer
3.172
971681AH1-341 GEN
Solar/Wind Harmer
22.448
276612AE2-035 GEN
Solar/Wind Harmer
2.996
957751AF2-069 GEN
Solar/Wind Harmer
0.296
971177AH1-047 GEN
Solar/Wind Harmer
2.685
274858EASY ROAD;U2
Solar/Wind Harmer
8.814
276157O29GEN1
Solar/Wind Harmer
6.493
274850MENDOTA H;RU
Solar/Wind Harmer
1.938
276602WESTBROOK C
Solar/Wind Harmer
1.605
276863AD2-134 GEN
Solar/Wind Harmer
1.348
276799AD1-013 GEN
Solar/Wind Harmer
1.607
946671AF1-331 GEN
Solar/Wind Harmer
0.304
274761LEE CO EC;2U
50/50
18.157
276158O29GEN2
Solar/Wind Harmer
8.536
276861AD2-134 GEN
Solar/Wind Harmer
1.348
274762LEE CO EC;3U
50/50
18.157
276603SUBLETTE C
Solar/Wind Harmer
1.796
938861AE1-114 GEN
Solar/Wind Harmer
11.979
274856ECOGROVE ;U1
Solar/Wind Harmer
3.948
276611AD2-172 GEN
Solar/Wind Harmer
2.996
276645AC1-214 GEN1
Solar/Wind Harmer
0.865
274715NELSON EC;1C
50/50
2.518
274760LEE CO EC;1U
50/50
18.157
965931AG1-462 GEN
Solar/Wind Harmer
41.852
972236AH1-702 GEN2
Adder
2.653
274878BISHOP HL;2U
Solar/Wind Harmer
2.683
959081AF2-199 GEN
Solar/Wind Harmer
47.027
971067AG2-660 GEN
Solar/Wind Harmer
10.937
970819AG2-516 GEN
Solar/Wind Harmer
12.543
971475AH1-234 GEN
Solar/Wind Harmer
21.831
274822ROCKFORD ;11
Adder
18.012
274717NELSON EC;2C
50/50
2.518
274718NELSON EC;2S
50/50
1.839
274765LEE CO EC;6U
50/50
18.199
274763LEE CO EC;4U
50/50
17.986
971333AH1-146 GEN
Solar/Wind Harmer
24.264
274851PROVIDENC;RU
Solar/Wind Harmer
1.838
276646AC1-214 GEN2
Solar/Wind Harmer
0.865
942991AE2-321 GEN
Solar/Wind Harmer
4.339
990512J1326
External Queue
4.566863536834717
991092J1477
External Queue
5.861337661743164
990407J1304
External Queue
3.351433038711548
990117J1214
External Queue
15.710009574890137
990727J1377 G
External Queue
5.881286144256592
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.884
TVALTFEXP_TVA->PJM
CLTF
1.223
LAGNLTFEXP_LAGN->PJM
CLTF
4.271
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.741
CPLELTFEXP_CPLE->PJM
CLTF
0.156
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.187
CBM West 2LTFEXP_CBM-W2->PJM
CBM
23.443
WECLTFEXP_WEC->PJM
CLTF
1.131
MECLTFEXP_MEC->PJM
CLTF
13.999
CBM West 1LTFEXP_CBM-W1->PJM
CBM
56.505
NYPJM->LTFIMP_NY
CLTF
0.234
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.081
SIGELTFEXP_SIGE->PJM
CLTF
0.015

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P4-6_006-345-BT78___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4-6_006-345-BT78___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:115.12 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:2114.81
MW Contribution:6.34
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
22.083
274848CAMPGROVE;RU
Solar/Wind Harmer
4.753
274767LEE CO EC;8U
50/50
19.723
959091AF2-200 GEN
Solar/Wind Harmer
95.344
971087AG2-675 GEN
50/50
6.344
957471AF2-041 GEN
Solar/Wind Harmer
143.016
274877BISHOP HL;1U
Solar/Wind Harmer
2.8
971341AH1-150 GEN
Solar/Wind Harmer
95.344
971343AH1-151 GEN
Solar/Wind Harmer
95.344
276741O09 GEN1
Solar/Wind Harmer
6.362
274849CRESCENT ;1U
Solar/Wind Harmer
1.247
971171AH1-044 GEN
Solar/Wind Harmer
95.344
946321AF1-296 GEN
Solar/Wind Harmer
17.449
274823ROCKFORD ;21
Adder
15.745
971675AH1-338 GEN
Solar/Wind Harmer
13.539
971411AH1-196 GEN
Solar/Wind Harmer
8.046
274716NELSON EC;1S
50/50
1.928
274855GSG-6 ;RU
Solar/Wind Harmer
2.827
274766LEE CO EC;7U
50/50
19.723
274857EASY ROAD;U1
Solar/Wind Harmer
9.688
972235AH1-702 GEN1
Adder
3.802
972267AH1-718 GEN
50/50
10.422
274764LEE CO EC;5U
50/50
20.005
276708O09 GEN2
Solar/Wind Harmer
6.362
276782AC1-033 GEN
Solar/Wind Harmer
3.31
971681AH1-341 GEN
Solar/Wind Harmer
22.705
276612AE2-035 GEN
Solar/Wind Harmer
2.786
957751AF2-069 GEN
Solar/Wind Harmer
0.31
274858EASY ROAD;U2
Solar/Wind Harmer
9.688
276157O29GEN1
Solar/Wind Harmer
6.775
274850MENDOTA H;RU
Solar/Wind Harmer
1.965
276602WESTBROOK C
Solar/Wind Harmer
1.627
276863AD2-134 GEN
Solar/Wind Harmer
1.367
276799AD1-013 GEN
Solar/Wind Harmer
1.627
946671AF1-331 GEN
Solar/Wind Harmer
0.308
274761LEE CO EC;2U
50/50
19.958
276158O29GEN2
Solar/Wind Harmer
8.906
276861AD2-134 GEN
Solar/Wind Harmer
1.367
274762LEE CO EC;3U
50/50
19.958
276603SUBLETTE C
Solar/Wind Harmer
1.853
938861AE1-114 GEN
Solar/Wind Harmer
11.873
274856ECOGROVE ;U1
Solar/Wind Harmer
3.671
276611AD2-172 GEN
Solar/Wind Harmer
2.786
276645AC1-214 GEN1
Solar/Wind Harmer
0.904
274715NELSON EC;1C
50/50
2.64
274760LEE CO EC;1U
50/50
19.958
965931AG1-462 GEN
Solar/Wind Harmer
43.474
274878BISHOP HL;2U
Solar/Wind Harmer
2.8
972236AH1-702 GEN2
Adder
1.767
959081AF2-199 GEN
Solar/Wind Harmer
47.672
971067AG2-660 GEN
Solar/Wind Harmer
11.086
970819AG2-516 GEN
Solar/Wind Harmer
11.004
274822ROCKFORD ;11
Adder
15.856
971475AH1-234 GEN
Solar/Wind Harmer
17.244
274717NELSON EC;2C
50/50
2.64
274718NELSON EC;2S
50/50
1.928
274765LEE CO EC;6U
50/50
20.005
274763LEE CO EC;4U
50/50
19.77
274851PROVIDENC;RU
Solar/Wind Harmer
1.921
276646AC1-214 GEN2
Solar/Wind Harmer
0.904
991092J1477
External Queue
6.189391613006592
990727J1377 G
External Queue
4.337488174438477
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.776
CPLELTFEXP_CPLE->PJM
CLTF
0.156
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.184
CBM West 2LTFEXP_CBM-W2->PJM
CBM
23.708
WECLTFEXP_WEC->PJM
CLTF
0.857
MECLTFEXP_MEC->PJM
CLTF
14.041
CBM West 1LTFEXP_CBM-W1->PJM
CBM
53.339
NYPJM->LTFIMP_NY
CLTF
0.237
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.08
SIGELTFEXP_SIGE->PJM
CLTF
0.016
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.889
TVALTFEXP_TVA->PJM
CLTF
1.234
LAGNLTFEXP_LAGN->PJM
CLTF
4.294

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:113.9 %
Rating:1334.0 MVA
Rating Type:A
MVA to Mitigate:1519.44
MW Contribution:5.56
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
7.26
274848CAMPGROVE;RU
Solar/Wind Harmer
0.001
274767LEE CO EC;8U
50/50
15.331
959091AF2-200 GEN
Solar/Wind Harmer
64.55
971087AG2-675 GEN
50/50
5.563
957471AF2-041 GEN
Solar/Wind Harmer
96.826
274877BISHOP HL;1U
Solar/Wind Harmer
0.17
971341AH1-150 GEN
Solar/Wind Harmer
64.55
971343AH1-151 GEN
Solar/Wind Harmer
64.55
276741O09 GEN1
Solar/Wind Harmer
0.387
274849CRESCENT ;1U
Solar/Wind Harmer
0
971171AH1-044 GEN
Solar/Wind Harmer
64.55
946321AF1-296 GEN
Solar/Wind Harmer
5.727
274823ROCKFORD ;21
Adder
12.852
971675AH1-338 GEN
Solar/Wind Harmer
1.739
274716NELSON EC;1S
50/50
1.688
274855GSG-6 ;RU
Solar/Wind Harmer
0.167
274766LEE CO EC;7U
50/50
15.331
274857EASY ROAD;U1
Solar/Wind Harmer
0.002
972235AH1-702 GEN1
Adder
2.064
972267AH1-718 GEN
50/50
9.128
274764LEE CO EC;5U
50/50
15.55
276708O09 GEN2
Solar/Wind Harmer
0.387
276782AC1-033 GEN
Solar/Wind Harmer
0.001
971335AH1-147 GEN
Solar/Wind Harmer
6.856
971681AH1-341 GEN
Solar/Wind Harmer
14.612
276612AE2-035 GEN
Solar/Wind Harmer
0.002
957751AF2-069 GEN
Solar/Wind Harmer
0.136
274858EASY ROAD;U2
Solar/Wind Harmer
0.002
276157O29GEN1
Solar/Wind Harmer
1.755
274850MENDOTA H;RU
Solar/Wind Harmer
0.054
276602WESTBROOK C
Solar/Wind Harmer
0
276863AD2-134 GEN
Solar/Wind Harmer
0.081
276799AD1-013 GEN
Solar/Wind Harmer
0.001
946671AF1-331 GEN
Solar/Wind Harmer
0.465
274761LEE CO EC;2U
50/50
15.514
276158O29GEN2
Solar/Wind Harmer
0.001
276861AD2-134 GEN
Solar/Wind Harmer
0.081
274762LEE CO EC;3U
50/50
15.514
276603SUBLETTE C
Solar/Wind Harmer
0
938861AE1-114 GEN
Solar/Wind Harmer
4.948
274856ECOGROVE ;U1
Solar/Wind Harmer
0.153
276611AD2-172 GEN
Solar/Wind Harmer
0.002
276645AC1-214 GEN1
Solar/Wind Harmer
0.162
274715NELSON EC;1C
50/50
2.313
274760LEE CO EC;1U
50/50
15.514
965931AG1-462 GEN
Solar/Wind Harmer
26.6
972236AH1-702 GEN2
Adder
1.79
274878BISHOP HL;2U
Solar/Wind Harmer
0.17
959081AF2-199 GEN
Solar/Wind Harmer
32.275
971067AG2-660 GEN
Solar/Wind Harmer
10.758
970819AG2-516 GEN
Solar/Wind Harmer
6.566
971475AH1-234 GEN
Solar/Wind Harmer
2.325
274822ROCKFORD ;11
Adder
12.944
274717NELSON EC;2C
50/50
2.313
274718NELSON EC;2S
50/50
1.688
274765LEE CO EC;6U
50/50
15.55
274763LEE CO EC;4U
50/50
15.367
274851PROVIDENC;RU
Solar/Wind Harmer
0.001
276646AC1-214 GEN2
Solar/Wind Harmer
0.162
971333AH1-146 GEN
Solar/Wind Harmer
6.856
991092J1477
External Queue
5.403221130371094
CBM West 2LTFEXP_CBM-W2->PJM
CBM
21.192
WECLTFEXP_WEC->PJM
CLTF
0.825
MECLTFEXP_MEC->PJM
CLTF
12.387
CBM West 1LTFEXP_CBM-W1->PJM
CBM
47.767
NYPJM->LTFIMP_NY
CLTF
0.191
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.053
SIGELTFEXP_SIGE->PJM
CLTF
0.015
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.862
TVALTFEXP_TVA->PJM
CLTF
1.111
LAGNLTFEXP_LAGN->PJM
CLTF
3.829
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.419
CPLELTFEXP_CPLE->PJM
CLTF
0.166
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.109

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P2-2_141_PV-138R__1_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P2-2_141_PV-138R__1_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:101.14 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:1858.03
MW Contribution:5.6
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
19.436
274848CAMPGROVE;RU
Solar/Wind Harmer
4.195
274767LEE CO EC;8U
50/50
15.472
959091AF2-200 GEN
Solar/Wind Harmer
92.627
971087AG2-675 GEN
50/50
5.597
957471AF2-041 GEN
Solar/Wind Harmer
138.941
274877BISHOP HL;1U
Solar/Wind Harmer
2.47
971341AH1-150 GEN
Solar/Wind Harmer
92.627
971343AH1-151 GEN
Solar/Wind Harmer
92.627
276741O09 GEN1
Solar/Wind Harmer
5.602
274849CRESCENT ;1U
Solar/Wind Harmer
1.101
971171AH1-044 GEN
Solar/Wind Harmer
92.627
946321AF1-296 GEN
Solar/Wind Harmer
15.394
274823ROCKFORD ;21
Adder
13.655
971675AH1-338 GEN
Solar/Wind Harmer
11.776
971411AH1-196 GEN
Solar/Wind Harmer
6.546
274716NELSON EC;1S
50/50
1.697
274855GSG-6 ;RU
Solar/Wind Harmer
2.459
274766LEE CO EC;7U
50/50
15.472
274857EASY ROAD;U1
Solar/Wind Harmer
7.6
972235AH1-702 GEN1
Adder
2.113
972267AH1-718 GEN
50/50
9.178
274764LEE CO EC;5U
50/50
15.693
276708O09 GEN2
Solar/Wind Harmer
5.602
276782AC1-033 GEN
Solar/Wind Harmer
2.92
971335AH1-147 GEN
Solar/Wind Harmer
10.058
971681AH1-341 GEN
Solar/Wind Harmer
19.897
276612AE2-035 GEN
Solar/Wind Harmer
2.454
971177AH1-047 GEN
Solar/Wind Harmer
3.553
957751AF2-069 GEN
Solar/Wind Harmer
0.273
274858EASY ROAD;U2
Solar/Wind Harmer
7.6
276157O29GEN1
Solar/Wind Harmer
5.966
274850MENDOTA H;RU
Solar/Wind Harmer
1.71
276602WESTBROOK C
Solar/Wind Harmer
1.416
276863AD2-134 GEN
Solar/Wind Harmer
1.189
276799AD1-013 GEN
Solar/Wind Harmer
1.414
946671AF1-331 GEN
Solar/Wind Harmer
0.268
274761LEE CO EC;2U
50/50
15.656
276158O29GEN2
Solar/Wind Harmer
7.843
276861AD2-134 GEN
Solar/Wind Harmer
1.189
274762LEE CO EC;3U
50/50
15.656
276603SUBLETTE C
Solar/Wind Harmer
1.629
938861AE1-114 GEN
Solar/Wind Harmer
10.449
274856ECOGROVE ;U1
Solar/Wind Harmer
3.234
276611AD2-172 GEN
Solar/Wind Harmer
2.454
276645AC1-214 GEN1
Solar/Wind Harmer
0.797
274715NELSON EC;1C
50/50
2.325
274760LEE CO EC;1U
50/50
15.656
965931AG1-462 GEN
Solar/Wind Harmer
38.358
972236AH1-702 GEN2
Adder
1.832
274878BISHOP HL;2U
Solar/Wind Harmer
2.47
959081AF2-199 GEN
Solar/Wind Harmer
46.314
971067AG2-660 GEN
Solar/Wind Harmer
10.771
970819AG2-516 GEN
Solar/Wind Harmer
9.773
971475AH1-234 GEN
Solar/Wind Harmer
15.858
274822ROCKFORD ;11
Adder
13.751
274717NELSON EC;2C
50/50
2.325
274718NELSON EC;2S
50/50
1.697
274765LEE CO EC;6U
50/50
15.693
274763LEE CO EC;4U
50/50
15.509
274851PROVIDENC;RU
Solar/Wind Harmer
1.695
276646AC1-214 GEN2
Solar/Wind Harmer
0.797
971333AH1-146 GEN
Solar/Wind Harmer
10.058
991092J1477
External Queue
5.43301248550415
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.442
CPLELTFEXP_CPLE->PJM
CLTF
0.167
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.112
CBM West 2LTFEXP_CBM-W2->PJM
CBM
21.343
WECLTFEXP_WEC->PJM
CLTF
0.835
MECLTFEXP_MEC->PJM
CLTF
12.488
CBM West 1LTFEXP_CBM-W1->PJM
CBM
48.27
NYPJM->LTFIMP_NY
CLTF
0.193
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.054
SIGELTFEXP_SIGE->PJM
CLTF
0.015
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.866
TVALTFEXP_TVA->PJM
CLTF
1.119
LAGNLTFEXP_LAGN->PJM
CLTF
3.858

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P2-2_154_LV-345R__3_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P2-2_154_LV-345R__3_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:101.06 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:1856.54
MW Contribution:5.59
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
19.403
274848CAMPGROVE;RU
Solar/Wind Harmer
4.189
274767LEE CO EC;8U
50/50
15.46
959091AF2-200 GEN
Solar/Wind Harmer
92.678
971087AG2-675 GEN
50/50
5.589
957471AF2-041 GEN
Solar/Wind Harmer
139.017
274877BISHOP HL;1U
Solar/Wind Harmer
2.467
971341AH1-150 GEN
Solar/Wind Harmer
92.678
971343AH1-151 GEN
Solar/Wind Harmer
92.678
276741O09 GEN1
Solar/Wind Harmer
5.595
274849CRESCENT ;1U
Solar/Wind Harmer
1.099
971171AH1-044 GEN
Solar/Wind Harmer
92.678
946321AF1-296 GEN
Solar/Wind Harmer
15.367
274823ROCKFORD ;21
Adder
13.268
971675AH1-338 GEN
Solar/Wind Harmer
11.698
971411AH1-196 GEN
Solar/Wind Harmer
6.845
274716NELSON EC;1S
50/50
1.696
274855GSG-6 ;RU
Solar/Wind Harmer
2.443
274766LEE CO EC;7U
50/50
15.46
274857EASY ROAD;U1
Solar/Wind Harmer
7.594
972235AH1-702 GEN1
Adder
2.11
972267AH1-718 GEN
50/50
9.172
274764LEE CO EC;5U
50/50
15.681
276708O09 GEN2
Solar/Wind Harmer
5.595
276782AC1-033 GEN
Solar/Wind Harmer
2.916
971335AH1-147 GEN
Solar/Wind Harmer
10.173
971681AH1-341 GEN
Solar/Wind Harmer
19.727
276612AE2-035 GEN
Solar/Wind Harmer
2.422
957751AF2-069 GEN
Solar/Wind Harmer
0.273
274858EASY ROAD;U2
Solar/Wind Harmer
7.594
276157O29GEN1
Solar/Wind Harmer
5.958
274850MENDOTA H;RU
Solar/Wind Harmer
1.699
276602WESTBROOK C
Solar/Wind Harmer
1.406
276863AD2-134 GEN
Solar/Wind Harmer
1.182
276799AD1-013 GEN
Solar/Wind Harmer
1.405
946671AF1-331 GEN
Solar/Wind Harmer
0.266
274761LEE CO EC;2U
50/50
15.644
276158O29GEN2
Solar/Wind Harmer
7.833
276861AD2-134 GEN
Solar/Wind Harmer
1.182
274762LEE CO EC;3U
50/50
15.644
276603SUBLETTE C
Solar/Wind Harmer
1.624
938861AE1-114 GEN
Solar/Wind Harmer
10.378
274856ECOGROVE ;U1
Solar/Wind Harmer
3.191
276611AD2-172 GEN
Solar/Wind Harmer
2.422
276645AC1-214 GEN1
Solar/Wind Harmer
0.796
274715NELSON EC;1C
50/50
2.324
274760LEE CO EC;1U
50/50
15.644
965931AG1-462 GEN
Solar/Wind Harmer
38.302
972236AH1-702 GEN2
Adder
1.83
274878BISHOP HL;2U
Solar/Wind Harmer
2.467
959081AF2-199 GEN
Solar/Wind Harmer
46.339
971067AG2-660 GEN
Solar/Wind Harmer
10.776
970819AG2-516 GEN
Solar/Wind Harmer
9.624
971475AH1-234 GEN
Solar/Wind Harmer
15.716
274822ROCKFORD ;11
Adder
13.362
274717NELSON EC;2C
50/50
2.324
274718NELSON EC;2S
50/50
1.696
274765LEE CO EC;6U
50/50
15.681
274763LEE CO EC;4U
50/50
15.497
274851PROVIDENC;RU
Solar/Wind Harmer
1.693
276646AC1-214 GEN2
Solar/Wind Harmer
0.796
971333AH1-146 GEN
Solar/Wind Harmer
10.173
991092J1477
External Queue
5.44020414352417
CBM West 2LTFEXP_CBM-W2->PJM
CBM
21.23
WECLTFEXP_WEC->PJM
CLTF
0.766
MECLTFEXP_MEC->PJM
CLTF
12.422
CBM West 1LTFEXP_CBM-W1->PJM
CBM
47.511
NYPJM->LTFIMP_NY
CLTF
0.194
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.055
SIGELTFEXP_SIGE->PJM
CLTF
0.015
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.856
TVALTFEXP_TVA->PJM
CLTF
1.112
LAGNLTFEXP_LAGN->PJM
CLTF
3.836
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.42
CPLELTFEXP_CPLE->PJM
CLTF
0.164
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.115

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P2-2_116_GG-345R__2_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P2-2_116_GG-345R__2_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:101.04 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:1856.04
MW Contribution:5.59
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
19.327
274848CAMPGROVE;RU
Solar/Wind Harmer
4.274
274767LEE CO EC;8U
50/50
15.348
959091AF2-200 GEN
Solar/Wind Harmer
92.522
971087AG2-675 GEN
50/50
5.587
957471AF2-041 GEN
Solar/Wind Harmer
138.783
274877BISHOP HL;1U
Solar/Wind Harmer
2.503
971341AH1-150 GEN
Solar/Wind Harmer
92.522
971343AH1-151 GEN
Solar/Wind Harmer
92.522
276741O09 GEN1
Solar/Wind Harmer
5.587
274849CRESCENT ;1U
Solar/Wind Harmer
1.118
971171AH1-044 GEN
Solar/Wind Harmer
92.522
946321AF1-296 GEN
Solar/Wind Harmer
15.354
274823ROCKFORD ;21
Adder
12.838
971675AH1-338 GEN
Solar/Wind Harmer
11.497
274716NELSON EC;1S
50/50
1.691
274855GSG-6 ;RU
Solar/Wind Harmer
2.402
274766LEE CO EC;7U
50/50
15.348
274857EASY ROAD;U1
Solar/Wind Harmer
7.539
972235AH1-702 GEN1
Adder
2.063
972267AH1-718 GEN
50/50
9.142
274764LEE CO EC;5U
50/50
15.568
276708O09 GEN2
Solar/Wind Harmer
5.587
276782AC1-033 GEN
Solar/Wind Harmer
2.959
971335AH1-147 GEN
Solar/Wind Harmer
9.798
971681AH1-341 GEN
Solar/Wind Harmer
19.54
276612AE2-035 GEN
Solar/Wind Harmer
2.378
957751AF2-069 GEN
Solar/Wind Harmer
0.278
274858EASY ROAD;U2
Solar/Wind Harmer
7.539
276157O29GEN1
Solar/Wind Harmer
5.95
274850MENDOTA H;RU
Solar/Wind Harmer
1.67
276602WESTBROOK C
Solar/Wind Harmer
1.383
276863AD2-134 GEN
Solar/Wind Harmer
1.162
276799AD1-013 GEN
Solar/Wind Harmer
1.38
946671AF1-331 GEN
Solar/Wind Harmer
0.261
274761LEE CO EC;2U
50/50
15.531
276158O29GEN2
Solar/Wind Harmer
7.822
276861AD2-134 GEN
Solar/Wind Harmer
1.162
274762LEE CO EC;3U
50/50
15.531
276603SUBLETTE C
Solar/Wind Harmer
1.615
938861AE1-114 GEN
Solar/Wind Harmer
10.273
274856ECOGROVE ;U1
Solar/Wind Harmer
3.135
276611AD2-172 GEN
Solar/Wind Harmer
2.378
276645AC1-214 GEN1
Solar/Wind Harmer
0.81
274715NELSON EC;1C
50/50
2.316
274760LEE CO EC;1U
50/50
15.531
965931AG1-462 GEN
Solar/Wind Harmer
38.29
972236AH1-702 GEN2
Adder
1.789
274878BISHOP HL;2U
Solar/Wind Harmer
2.503
959081AF2-199 GEN
Solar/Wind Harmer
46.261
971067AG2-660 GEN
Solar/Wind Harmer
10.758
970819AG2-516 GEN
Solar/Wind Harmer
9.409
971475AH1-234 GEN
Solar/Wind Harmer
15.373
274822ROCKFORD ;11
Adder
12.929
274717NELSON EC;2C
50/50
2.316
274718NELSON EC;2S
50/50
1.691
274765LEE CO EC;6U
50/50
15.568
274763LEE CO EC;4U
50/50
15.385
274851PROVIDENC;RU
Solar/Wind Harmer
1.721
276646AC1-214 GEN2
Solar/Wind Harmer
0.81
971333AH1-146 GEN
Solar/Wind Harmer
9.798
991092J1477
External Queue
5.438880443572998
CBM West 1LTFEXP_CBM-W1->PJM
CBM
47.934
NYPJM->LTFIMP_NY
CLTF
0.194
TVALTFEXP_TVA->PJM
CLTF
1.131
LAGNLTFEXP_LAGN->PJM
CLTF
3.885
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.879
CPLELTFEXP_CPLE->PJM
CLTF
0.17
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.102
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.483
WECLTFEXP_WEC->PJM
CLTF
0.817
MECLTFEXP_MEC->PJM
CLTF
12.489
CBM West 2LTFEXP_CBM-W2->PJM
CBM
21.629
LGEELTFEXP_LGEE->PJM
CLTF
0.001
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.052
SIGELTFEXP_SIGE->PJM
CLTF
0.016

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P2-2_116_GG-345B__4_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P2-2_116_GG-345B__4_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:100.99 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:1855.19
MW Contribution:5.58
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
19.282
274848CAMPGROVE;RU
Solar/Wind Harmer
4.264
274767LEE CO EC;8U
50/50
15.304
959091AF2-200 GEN
Solar/Wind Harmer
92.427
971087AG2-675 GEN
50/50
5.575
957471AF2-041 GEN
Solar/Wind Harmer
138.64
274877BISHOP HL;1U
Solar/Wind Harmer
2.497
971341AH1-150 GEN
Solar/Wind Harmer
92.427
971343AH1-151 GEN
Solar/Wind Harmer
92.427
276741O09 GEN1
Solar/Wind Harmer
5.575
274849CRESCENT ;1U
Solar/Wind Harmer
1.114
971171AH1-044 GEN
Solar/Wind Harmer
92.427
946321AF1-296 GEN
Solar/Wind Harmer
15.317
274823ROCKFORD ;21
Adder
12.735
971675AH1-338 GEN
Solar/Wind Harmer
11.416
274716NELSON EC;1S
50/50
1.687
274855GSG-6 ;RU
Solar/Wind Harmer
2.386
274766LEE CO EC;7U
50/50
15.304
274857EASY ROAD;U1
Solar/Wind Harmer
7.517
972235AH1-702 GEN1
Adder
2.05
972267AH1-718 GEN
50/50
9.124
274764LEE CO EC;5U
50/50
15.523
276708O09 GEN2
Solar/Wind Harmer
5.575
276782AC1-033 GEN
Solar/Wind Harmer
2.952
971335AH1-147 GEN
Solar/Wind Harmer
9.691
971681AH1-341 GEN
Solar/Wind Harmer
19.472
276612AE2-035 GEN
Solar/Wind Harmer
2.366
957751AF2-069 GEN
Solar/Wind Harmer
0.277
274858EASY ROAD;U2
Solar/Wind Harmer
7.517
276157O29GEN1
Solar/Wind Harmer
5.936
274850MENDOTA H;RU
Solar/Wind Harmer
1.659
276602WESTBROOK C
Solar/Wind Harmer
1.373
276863AD2-134 GEN
Solar/Wind Harmer
1.154
276799AD1-013 GEN
Solar/Wind Harmer
1.37
946671AF1-331 GEN
Solar/Wind Harmer
0.259
274761LEE CO EC;2U
50/50
15.486
276158O29GEN2
Solar/Wind Harmer
7.804
276861AD2-134 GEN
Solar/Wind Harmer
1.154
274762LEE CO EC;3U
50/50
15.486
276603SUBLETTE C
Solar/Wind Harmer
1.61
938861AE1-114 GEN
Solar/Wind Harmer
10.236
274856ECOGROVE ;U1
Solar/Wind Harmer
3.118
276611AD2-172 GEN
Solar/Wind Harmer
2.366
276645AC1-214 GEN1
Solar/Wind Harmer
0.807
274715NELSON EC;1C
50/50
2.311
274760LEE CO EC;1U
50/50
15.486
965931AG1-462 GEN
Solar/Wind Harmer
38.203
972236AH1-702 GEN2
Adder
1.778
274878BISHOP HL;2U
Solar/Wind Harmer
2.497
959081AF2-199 GEN
Solar/Wind Harmer
46.213
971067AG2-660 GEN
Solar/Wind Harmer
10.747
970819AG2-516 GEN
Solar/Wind Harmer
9.348
971475AH1-234 GEN
Solar/Wind Harmer
15.255
274822ROCKFORD ;11
Adder
12.826
274717NELSON EC;2C
50/50
2.311
274718NELSON EC;2S
50/50
1.687
274765LEE CO EC;6U
50/50
15.523
274763LEE CO EC;4U
50/50
15.34
274851PROVIDENC;RU
Solar/Wind Harmer
1.716
276646AC1-214 GEN2
Solar/Wind Harmer
0.807
971333AH1-146 GEN
Solar/Wind Harmer
9.691
991092J1477
External Queue
5.43087100982666
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.478
WECLTFEXP_WEC->PJM
CLTF
0.793
MECLTFEXP_MEC->PJM
CLTF
12.444
CBM West 2LTFEXP_CBM-W2->PJM
CBM
21.576
LGEELTFEXP_LGEE->PJM
CLTF
0.003
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.05
SIGELTFEXP_SIGE->PJM
CLTF
0.016
CBM West 1LTFEXP_CBM-W1->PJM
CBM
47.615
NYPJM->LTFIMP_NY
CLTF
0.192
TVALTFEXP_TVA->PJM
CLTF
1.129
LAGNLTFEXP_LAGN->PJM
CLTF
3.874
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.883
CPLELTFEXP_CPLE->PJM
CLTF
0.172
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.097

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P2-2_951_AR-345R__3_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P2-2_951_AR-345R__3_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:100.85 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:1852.6
MW Contribution:5.58
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
19.359
274848CAMPGROVE;RU
Solar/Wind Harmer
4.179
274767LEE CO EC;8U
50/50
15.408
959091AF2-200 GEN
Solar/Wind Harmer
92.644
971087AG2-675 GEN
50/50
5.583
957471AF2-041 GEN
Solar/Wind Harmer
138.965
274877BISHOP HL;1U
Solar/Wind Harmer
2.461
971341AH1-150 GEN
Solar/Wind Harmer
92.644
971343AH1-151 GEN
Solar/Wind Harmer
92.644
276741O09 GEN1
Solar/Wind Harmer
5.583
274849CRESCENT ;1U
Solar/Wind Harmer
1.096
971171AH1-044 GEN
Solar/Wind Harmer
92.644
946321AF1-296 GEN
Solar/Wind Harmer
15.347
274823ROCKFORD ;21
Adder
13.038
971675AH1-338 GEN
Solar/Wind Harmer
11.596
971411AH1-196 GEN
Solar/Wind Harmer
6.486
274716NELSON EC;1S
50/50
1.694
274855GSG-6 ;RU
Solar/Wind Harmer
2.422
274766LEE CO EC;7U
50/50
15.408
274857EASY ROAD;U1
Solar/Wind Harmer
7.569
972235AH1-702 GEN1
Adder
2.089
972267AH1-718 GEN
50/50
9.157
274764LEE CO EC;5U
50/50
15.629
276708O09 GEN2
Solar/Wind Harmer
5.583
276782AC1-033 GEN
Solar/Wind Harmer
2.91
971335AH1-147 GEN
Solar/Wind Harmer
10.083
971681AH1-341 GEN
Solar/Wind Harmer
19.622
276612AE2-035 GEN
Solar/Wind Harmer
2.399
957751AF2-069 GEN
Solar/Wind Harmer
0.272
274858EASY ROAD;U2
Solar/Wind Harmer
7.569
276157O29GEN1
Solar/Wind Harmer
5.946
274850MENDOTA H;RU
Solar/Wind Harmer
1.684
276602WESTBROOK C
Solar/Wind Harmer
1.394
276863AD2-134 GEN
Solar/Wind Harmer
1.171
276799AD1-013 GEN
Solar/Wind Harmer
1.392
946671AF1-331 GEN
Solar/Wind Harmer
0.264
274761LEE CO EC;2U
50/50
15.592
276158O29GEN2
Solar/Wind Harmer
7.817
276861AD2-134 GEN
Solar/Wind Harmer
1.171
274762LEE CO EC;3U
50/50
15.592
276603SUBLETTE C
Solar/Wind Harmer
1.619
938861AE1-114 GEN
Solar/Wind Harmer
10.322
274856ECOGROVE ;U1
Solar/Wind Harmer
3.162
276611AD2-172 GEN
Solar/Wind Harmer
2.399
276645AC1-214 GEN1
Solar/Wind Harmer
0.794
274715NELSON EC;1C
50/50
2.32
274760LEE CO EC;1U
50/50
15.592
965931AG1-462 GEN
Solar/Wind Harmer
38.258
972236AH1-702 GEN2
Adder
1.812
274878BISHOP HL;2U
Solar/Wind Harmer
2.461
959081AF2-199 GEN
Solar/Wind Harmer
46.322
971067AG2-660 GEN
Solar/Wind Harmer
10.773
970819AG2-516 GEN
Solar/Wind Harmer
9.519
971475AH1-234 GEN
Solar/Wind Harmer
15.585
274822ROCKFORD ;11
Adder
13.131
274717NELSON EC;2C
50/50
2.32
274718NELSON EC;2S
50/50
1.694
274765LEE CO EC;6U
50/50
15.629
274763LEE CO EC;4U
50/50
15.445
274851PROVIDENC;RU
Solar/Wind Harmer
1.689
276646AC1-214 GEN2
Solar/Wind Harmer
0.794
971333AH1-146 GEN
Solar/Wind Harmer
10.083
991092J1477
External Queue
5.418740749359131
CBM West 1LTFEXP_CBM-W1->PJM
CBM
48.137
NYPJM->LTFIMP_NY
CLTF
0.197
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.058
SIGELTFEXP_SIGE->PJM
CLTF
0.015
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.846
TVALTFEXP_TVA->PJM
CLTF
1.11
LAGNLTFEXP_LAGN->PJM
CLTF
3.836
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.412
CPLELTFEXP_CPLE->PJM
CLTF
0.16
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.123
CBM West 2LTFEXP_CBM-W2->PJM
CBM
21.208
WECLTFEXP_WEC->PJM
CLTF
0.848
MECLTFEXP_MEC->PJM
CLTF
12.447

Details for LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line l/o COMED_P4-6_111-345-B______SRT-A


Base Case Flowgate

Area:CE
Facility Description:
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4-6_111-345-B______SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.74 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:1869.05
MW Contribution:8.07
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
27.726
274848CAMPGROVE;RU
Solar/Wind Harmer
6.329
274767LEE CO EC;8U
50/50
43.519
959091AF2-200 GEN
Solar/Wind Harmer
64.216
971087AG2-675 GEN
50/50
8.07
957471AF2-041 GEN
Solar/Wind Harmer
96.324
274877BISHOP HL;1U
Solar/Wind Harmer
3.71
971341AH1-150 GEN
Solar/Wind Harmer
64.216
971343AH1-151 GEN
Solar/Wind Harmer
64.216
276741O09 GEN1
Solar/Wind Harmer
8.231
274849CRESCENT ;1U
Solar/Wind Harmer
1.686
971171AH1-044 GEN
Solar/Wind Harmer
64.216
946321AF1-296 GEN
Solar/Wind Harmer
21.594
971675AH1-338 GEN
Solar/Wind Harmer
9.356
274716NELSON EC;1S
50/50
2.624
274855GSG-6 ;RU
Solar/Wind Harmer
1.988
274766LEE CO EC;7U
50/50
43.519
274857EASY ROAD;U1
Solar/Wind Harmer
21.377
274764LEE CO EC;5U
50/50
44.142
972267AH1-718 GEN
50/50
14.187
276708O09 GEN2
Solar/Wind Harmer
8.231
276782AC1-033 GEN
Solar/Wind Harmer
4.386
971681AH1-341 GEN
Solar/Wind Harmer
16.384
957751AF2-069 GEN
Solar/Wind Harmer
0.419
274858EASY ROAD;U2
Solar/Wind Harmer
21.377
276157O29GEN1
Solar/Wind Harmer
8.765
274850MENDOTA H;RU
Solar/Wind Harmer
1.382
276602WESTBROOK C
Solar/Wind Harmer
1.144
276863AD2-134 GEN
Solar/Wind Harmer
0.961
276799AD1-013 GEN
Solar/Wind Harmer
1.098
946671AF1-331 GEN
Solar/Wind Harmer
0.208
274761LEE CO EC;2U
50/50
44.038
276158O29GEN2
Solar/Wind Harmer
11.523
276861AD2-134 GEN
Solar/Wind Harmer
0.961
274762LEE CO EC;3U
50/50
44.038
276603SUBLETTE C
Solar/Wind Harmer
2.048
276645AC1-214 GEN1
Solar/Wind Harmer
1.222
938861AE1-114 GEN
Solar/Wind Harmer
6.639
926823AC1-168 GEN
Solar/Wind Harmer
2.136
274760LEE CO EC;1U
50/50
44.038
274715NELSON EC;1C
50/50
3.594
965931AG1-462 GEN
Solar/Wind Harmer
55.304
274878BISHOP HL;2U
Solar/Wind Harmer
3.71
959081AF2-199 GEN
Solar/Wind Harmer
32.108
971067AG2-660 GEN
Solar/Wind Harmer
7.467
274765LEE CO EC;6U
50/50
44.142
274763LEE CO EC;4U
50/50
43.623
274717NELSON EC;2C
50/50
3.594
274718NELSON EC;2S
50/50
2.624
274851PROVIDENC;RU
Solar/Wind Harmer
2.598
276646AC1-214 GEN2
Solar/Wind Harmer
1.222
991092J1477
External Queue
8.75338363647461
991303J1755 G
External Queue
5.778924465179443
CBM West 2LTFEXP_CBM-W2->PJM
CBM
27.789
VTFLTFEXP_VFT->PJM
CMTX
0.11
TVALTFEXP_TVA->PJM
CLTF
1.528
CBM West 1LTFEXP_CBM-W1->PJM
CBM
18.006
G-007ALTFEXP_G-007A->PJM
CMTX
0.043
CPLELTFEXP_CPLE->PJM
CLTF
0.527
SIGELTFEXP_SIGE->PJM
CLTF
0.036
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.889
LGEELTFEXP_LGEE->PJM
CLTF
0.236
LAGNLTFEXP_LAGN->PJM
CLTF
4.636
CBM South 1LTFEXP_CBM-S1->PJM
CBM
4.935
NYPJM->LTFIMP_NY
CLTF
0.004
MECLTFEXP_MEC->PJM
CLTF
13.074

Details for LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line l/o COMED_P2-2_111_EJ-345B__1_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P2-2_111_EJ-345B__1_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:101.1 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:1857.24
MW Contribution:8.25
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
28.357
274848CAMPGROVE;RU
Solar/Wind Harmer
6.437
274767LEE CO EC;8U
50/50
44.209
959091AF2-200 GEN
Solar/Wind Harmer
65.408
971087AG2-675 GEN
50/50
8.251
957471AF2-041 GEN
Solar/Wind Harmer
98.112
274877BISHOP HL;1U
Solar/Wind Harmer
3.775
971341AH1-150 GEN
Solar/Wind Harmer
65.408
971343AH1-151 GEN
Solar/Wind Harmer
65.408
276741O09 GEN1
Solar/Wind Harmer
8.403
274849CRESCENT ;1U
Solar/Wind Harmer
1.712
971171AH1-044 GEN
Solar/Wind Harmer
65.408
946321AF1-296 GEN
Solar/Wind Harmer
22.109
971675AH1-338 GEN
Solar/Wind Harmer
10.19
274716NELSON EC;1S
50/50
2.673
274855GSG-6 ;RU
Solar/Wind Harmer
2.16
274766LEE CO EC;7U
50/50
44.209
274857EASY ROAD;U1
Solar/Wind Harmer
21.716
274764LEE CO EC;5U
50/50
44.841
972267AH1-718 GEN
50/50
14.452
276708O09 GEN2
Solar/Wind Harmer
8.403
276782AC1-033 GEN
Solar/Wind Harmer
4.463
971681AH1-341 GEN
Solar/Wind Harmer
17.36
957751AF2-069 GEN
Solar/Wind Harmer
0.425
274858EASY ROAD;U2
Solar/Wind Harmer
21.716
276157O29GEN1
Solar/Wind Harmer
8.948
274850MENDOTA H;RU
Solar/Wind Harmer
1.502
276602WESTBROOK C
Solar/Wind Harmer
1.243
276863AD2-134 GEN
Solar/Wind Harmer
1.045
276799AD1-013 GEN
Solar/Wind Harmer
1.2
946671AF1-331 GEN
Solar/Wind Harmer
0.227
274761LEE CO EC;2U
50/50
44.736
276158O29GEN2
Solar/Wind Harmer
11.764
276861AD2-134 GEN
Solar/Wind Harmer
1.045
274762LEE CO EC;3U
50/50
44.736
276603SUBLETTE C
Solar/Wind Harmer
2.11
276645AC1-214 GEN1
Solar/Wind Harmer
1.24
938861AE1-114 GEN
Solar/Wind Harmer
7.193
926823AC1-168 GEN
Solar/Wind Harmer
2.145
274760LEE CO EC;1U
50/50
44.736
274715NELSON EC;1C
50/50
3.661
965931AG1-462 GEN
Solar/Wind Harmer
56.543
274878BISHOP HL;2U
Solar/Wind Harmer
3.775
959081AF2-199 GEN
Solar/Wind Harmer
32.704
971067AG2-660 GEN
Solar/Wind Harmer
7.606
274765LEE CO EC;6U
50/50
44.841
274763LEE CO EC;4U
50/50
44.314
274717NELSON EC;2C
50/50
3.661
274718NELSON EC;2S
50/50
2.673
274851PROVIDENC;RU
Solar/Wind Harmer
2.636
276646AC1-214 GEN2
Solar/Wind Harmer
1.24
991092J1477
External Queue
8.875598907470703
991303J1755 G
External Queue
5.713708400726318
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.915
TVALTFEXP_TVA->PJM
CLTF
1.574
CBM South 1LTFEXP_CBM-S1->PJM
CBM
5.075
CPLELTFEXP_CPLE->PJM
CLTF
0.53
SIGELTFEXP_SIGE->PJM
CLTF
0.036
CBM West 2LTFEXP_CBM-W2->PJM
CBM
28.677
LGEELTFEXP_LGEE->PJM
CLTF
0.232
LAGNLTFEXP_LAGN->PJM
CLTF
4.809
CBM West 1LTFEXP_CBM-W1->PJM
CBM
22.095
NYPJM->LTFIMP_NY
CLTF
0.016
MECLTFEXP_MEC->PJM
CLTF
13.673

Details for LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line l/o COMED_P4_111-45-TR81____SRT-A


Base Case Flowgate

Area:CE
Facility Description:
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_111-45-TR81____SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.09 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:1857.09
MW Contribution:8.25
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
28.357
274848CAMPGROVE;RU
Solar/Wind Harmer
6.437
274767LEE CO EC;8U
50/50
44.209
959091AF2-200 GEN
Solar/Wind Harmer
65.408
971087AG2-675 GEN
50/50
8.251
957471AF2-041 GEN
Solar/Wind Harmer
98.112
274877BISHOP HL;1U
Solar/Wind Harmer
3.775
971341AH1-150 GEN
Solar/Wind Harmer
65.408
971343AH1-151 GEN
Solar/Wind Harmer
65.408
276741O09 GEN1
Solar/Wind Harmer
8.403
274849CRESCENT ;1U
Solar/Wind Harmer
1.712
971171AH1-044 GEN
Solar/Wind Harmer
65.408
946321AF1-296 GEN
Solar/Wind Harmer
22.109
971675AH1-338 GEN
Solar/Wind Harmer
10.19
274716NELSON EC;1S
50/50
2.673
274855GSG-6 ;RU
Solar/Wind Harmer
2.16
274766LEE CO EC;7U
50/50
44.209
274857EASY ROAD;U1
Solar/Wind Harmer
21.716
274764LEE CO EC;5U
50/50
44.841
972267AH1-718 GEN
50/50
14.452
276708O09 GEN2
Solar/Wind Harmer
8.403
276782AC1-033 GEN
Solar/Wind Harmer
4.463
971681AH1-341 GEN
Solar/Wind Harmer
17.36
957751AF2-069 GEN
Solar/Wind Harmer
0.425
274858EASY ROAD;U2
Solar/Wind Harmer
21.716
276157O29GEN1
Solar/Wind Harmer
8.948
274850MENDOTA H;RU
Solar/Wind Harmer
1.502
276602WESTBROOK C
Solar/Wind Harmer
1.243
276863AD2-134 GEN
Solar/Wind Harmer
1.045
276799AD1-013 GEN
Solar/Wind Harmer
1.2
946671AF1-331 GEN
Solar/Wind Harmer
0.227
274761LEE CO EC;2U
50/50
44.736
276158O29GEN2
Solar/Wind Harmer
11.764
276861AD2-134 GEN
Solar/Wind Harmer
1.045
274762LEE CO EC;3U
50/50
44.736
276603SUBLETTE C
Solar/Wind Harmer
2.11
276645AC1-214 GEN1
Solar/Wind Harmer
1.24
938861AE1-114 GEN
Solar/Wind Harmer
7.193
926823AC1-168 GEN
Solar/Wind Harmer
2.145
274760LEE CO EC;1U
50/50
44.736
274715NELSON EC;1C
50/50
3.661
965931AG1-462 GEN
Solar/Wind Harmer
56.543
274878BISHOP HL;2U
Solar/Wind Harmer
3.775
959081AF2-199 GEN
Solar/Wind Harmer
32.704
971067AG2-660 GEN
Solar/Wind Harmer
7.606
274765LEE CO EC;6U
50/50
44.841
274763LEE CO EC;4U
50/50
44.314
274717NELSON EC;2C
50/50
3.661
274718NELSON EC;2S
50/50
2.673
274851PROVIDENC;RU
Solar/Wind Harmer
2.636
276646AC1-214 GEN2
Solar/Wind Harmer
1.24
991092J1477
External Queue
8.875598907470703
991303J1755 G
External Queue
5.713708400726318
CBM West 1LTFEXP_CBM-W1->PJM
CBM
22.095
NYPJM->LTFIMP_NY
CLTF
0.016
MECLTFEXP_MEC->PJM
CLTF
13.673
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.915
TVALTFEXP_TVA->PJM
CLTF
1.574
CBM South 1LTFEXP_CBM-S1->PJM
CBM
5.075
CPLELTFEXP_CPLE->PJM
CLTF
0.53
SIGELTFEXP_SIGE->PJM
CLTF
0.036
CBM West 2LTFEXP_CBM-W2->PJM
CBM
28.677
LGEELTFEXP_LGEE->PJM
CLTF
0.232
LAGNLTFEXP_LAGN->PJM
CLTF
4.809

Details for LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line l/o COMED_P4_111-45-L11124__SRT-A


Base Case Flowgate

Area:CE
Facility Description:
LEE CO EC;BP-BYRON ; B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_111-45-L11124__SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.09 %
Rating:1837.0 MVA
Rating Type:STE
MVA to Mitigate:1857.09
MW Contribution:8.25
Bus #Bus NameTypeMW Contribution
961011AF2-392 GEN
Solar/Wind Harmer
28.357
274848CAMPGROVE;RU
Solar/Wind Harmer
6.437
274767LEE CO EC;8U
50/50
44.209
959091AF2-200 GEN
Solar/Wind Harmer
65.408
971087AG2-675 GEN
50/50
8.251
957471AF2-041 GEN
Solar/Wind Harmer
98.112
274877BISHOP HL;1U
Solar/Wind Harmer
3.775
971341AH1-150 GEN
Solar/Wind Harmer
65.408
971343AH1-151 GEN
Solar/Wind Harmer
65.408
276741O09 GEN1
Solar/Wind Harmer
8.403
274849CRESCENT ;1U
Solar/Wind Harmer
1.712
971171AH1-044 GEN
Solar/Wind Harmer
65.408
946321AF1-296 GEN
Solar/Wind Harmer
22.109
971675AH1-338 GEN
Solar/Wind Harmer
10.19
274716NELSON EC;1S
50/50
2.673
274855GSG-6 ;RU
Solar/Wind Harmer
2.16
274766LEE CO EC;7U
50/50
44.209
274857EASY ROAD;U1
Solar/Wind Harmer
21.716
274764LEE CO EC;5U
50/50
44.841
972267AH1-718 GEN
50/50
14.452
276708O09 GEN2
Solar/Wind Harmer
8.403
276782AC1-033 GEN
Solar/Wind Harmer
4.463
971681AH1-341 GEN
Solar/Wind Harmer
17.36
957751AF2-069 GEN
Solar/Wind Harmer
0.425
274858EASY ROAD;U2
Solar/Wind Harmer
21.716
276157O29GEN1
Solar/Wind Harmer
8.948
274850MENDOTA H;RU
Solar/Wind Harmer
1.502
276602WESTBROOK C
Solar/Wind Harmer
1.243
276863AD2-134 GEN
Solar/Wind Harmer
1.045
276799AD1-013 GEN
Solar/Wind Harmer
1.2
946671AF1-331 GEN
Solar/Wind Harmer
0.227
274761LEE CO EC;2U
50/50
44.736
276158O29GEN2
Solar/Wind Harmer
11.764
276861AD2-134 GEN
Solar/Wind Harmer
1.045
274762LEE CO EC;3U
50/50
44.736
276603SUBLETTE C
Solar/Wind Harmer
2.11
276645AC1-214 GEN1
Solar/Wind Harmer
1.24
938861AE1-114 GEN
Solar/Wind Harmer
7.193
926823AC1-168 GEN
Solar/Wind Harmer
2.145
274760LEE CO EC;1U
50/50
44.736
274715NELSON EC;1C
50/50
3.661
965931AG1-462 GEN
Solar/Wind Harmer
56.543
274878BISHOP HL;2U
Solar/Wind Harmer
3.775
959081AF2-199 GEN
Solar/Wind Harmer
32.704
971067AG2-660 GEN
Solar/Wind Harmer
7.606
274765LEE CO EC;6U
50/50
44.841
274763LEE CO EC;4U
50/50
44.314
274717NELSON EC;2C
50/50
3.661
274718NELSON EC;2S
50/50
2.673
274851PROVIDENC;RU
Solar/Wind Harmer
2.636
276646AC1-214 GEN2
Solar/Wind Harmer
1.24
991092J1477
External Queue
8.875598907470703
991303J1755 G
External Queue
5.713708400726318
CBM West 2LTFEXP_CBM-W2->PJM
CBM
28.677
LGEELTFEXP_LGEE->PJM
CLTF
0.232
LAGNLTFEXP_LAGN->PJM
CLTF
4.809
CBM West 1LTFEXP_CBM-W1->PJM
CBM
22.095
NYPJM->LTFIMP_NY
CLTF
0.016
MECLTFEXP_MEC->PJM
CLTF
13.673
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.915
TVALTFEXP_TVA->PJM
CLTF
1.574
CBM South 1LTFEXP_CBM-S1->PJM
CBM
5.075
CPLELTFEXP_CPLE->PJM
CLTF
0.53
SIGELTFEXP_SIGE->PJM
CLTF
0.036
CONTINGENCY 'COMED_P4_144-45-BT5-8___SRT-A'
 TRIP BRANCH FROM BUS 270916 TO BUS 270917 CKT Z1   /*WAYNE    ; B 345.0 - WAYNE    ; R 345.0
 TRIP BRANCH FROM BUS 971332 TO BUS 270916 CKT 1    /*AH1-146 TP   345.0 - WAYNE    ; B 345.0
END
CONTINGENCY 'COMED_P4_006-45-BT3-8___SRT-A'
 TRIP BRANCH FROM BUS 270678 TO BUS 270679 CKT Z1   /*BYRON    ; B 345.0 - BYRON    ; R 345.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1    /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
CONTINGENCY 'COMED_P4_006-45-BT3-4___SRT-A'
 REMOVE UNIT 1 FROM BUS 274656                     /*BYRON    ;1U  25.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1   /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
CONTINGENCY 'COMED_P4_144-45-BT7-8___SRT-A'
 TRIP BRANCH FROM BUS 270916 TO BUS 270900 CKT 1   /*WAYNE    ; B 345.0 - TOLLWAY ; B  345.0
 TRIP BRANCH FROM BUS 275228 TO BUS 270916 CKT 1   /*WAYNE    ;1M 138.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 275228 TO BUS 272740 CKT 1   /*WAYNE    ;1M 138.0 - WAYNE    ; B 138.0
 TRIP BRANCH FROM BUS 275228 TO BUS 275328 CKT 1   /*WAYNE    ;1M 138.0 - WAYNE    ;1C  34.5
 TRIP BRANCH FROM BUS 971332 TO BUS 270916 CKT 1   /*AH1-146 TP   345.0 - WAYNE    ; B 345.0
END
CONTINGENCY 'COMED_P4-6_006-345-BT78___SRT-A'
 TRIP BRANCH FROM BUS 270678 TO BUS 270679 CKT Z1   /*BYRON    ; B 345.0 - BYRON    ; R 345.0
 TRIP BRANCH FROM BUS 270678 TO BUS 971332 CKT 1    /*BYRON    ; B 345.0 - AH1-146 TP   345.0
END
CONTINGENCY 'COMED_P2-2_141_PV-138R__1_SRT-A'
 REMOVE SWSHUNT FROM BUS 272257                                 /*PL VALLEY; R 138.0
 TRIP BRANCH FROM BUS 270851 TO BUS 272257 TO BUS 275309 CKT 1  /*PL VALLEY; R 345.0 - PL VALLEY; R 138.0 - PL VALLEY;1C  34.5
 TRIP BRANCH FROM BUS 272257 TO BUS 271677 CKT 1                /*PL VALLEY; R 138.0 - HUNTLEY  ; R 138.0
 TRIP BRANCH FROM BUS 272257 TO BUS 271975 CKT 1                /*PL VALLEY; R 138.0 - MARENGO  ;RT 138.0
END
CONTINGENCY 'COMED_P2-2_154_LV-345R__3_SRT-A'
 DISCONNECT BUS 275194                             /*LIBERTYVI;1M 138.0
 TRIP BRANCH FROM BUS 270807 TO BUS 270883 CKT 1   /*LIBERTYVI; R 345.0 - SILVER LK; R 345.0
END
CONTINGENCY 'COMED_P2-2_116_GG-345R__2_SRT-A'
 DISCONNECT BUS 270769   /*GOODINGS ;2R 345.0
END
CONTINGENCY 'COMED_P2-2_116_GG-345B__4_SRT-A'
 DISCONNECT BUS 270770   /*GOODINGS ;4B 345.0
END
CONTINGENCY 'COMED_P2-2_951_AR-345R__3_SRT-A'
 DISCONNECT BUS 274749   /*AURORA EC;RP 345.0
END
CONTINGENCY 'COMED_P4-6_111-345-B______SRT-A'
 DISCONNECT BUS 270730                                          /*ELECT JCT;2B 345.0
 DISCONNECT BUS 270732                                          /*ELECT JCT;1B 345.0
 TRIP BRANCH FROM BUS 270928 TO BUS 272794 TO BUS 275334 CKT 1  /*WOLFS    ; B 345.0 - WOLFS    ; B 138.0 - WOLFS    ;1C  34.5
END
CONTINGENCY 'COMED_P2-2_111_EJ-345B__1_SRT-A'
 DISCONNECT BUS 270732   /*ELECT JCT;1B 345.0
END
CONTINGENCY 'COMED_P4_111-45-TR81____SRT-A'
 DISCONNECT BUS 270732                             /*ELECT JCT;1B 345.0
 TRIP BRANCH FROM BUS 275182 TO BUS 270732 CKT 1   /*ELECT JCT;1M 138.0 - ELECT JCT;1B 345.0
 TRIP BRANCH FROM BUS 275182 TO BUS 271392 CKT 1   /*ELECT JCT;1M 138.0 - ELECT JCT;1B 138.0
 TRIP BRANCH FROM BUS 275182 TO BUS 275282 CKT 1   /*ELECT JCT;1M 138.0 - ELECT JCT;1C  34.5
END
CONTINGENCY 'COMED_P4_111-45-L11124__SRT-A'
 DISCONNECT BUS 270732                             /*ELECT JCT;1B 345.0
 TRIP BRANCH FROM BUS 270732 TO BUS 270814 CKT 1   /*ELECT JCT;1B 345.0 - LOMBARD  ;4B 345.0
END
957470 to 270732 ckt 1
274768 to 270678 ckt 1

Winter Peak Analysis

The New Service Request AG2-675 was evaluated as a 80.0 MW (32.0 MW Capacity) injection in the ComEd area.

AG2-675 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 335.0 MW (80.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P4_006-45-BT3-8___SRT-A
BreakerAC101.03 %1912.0STE1931.757.47
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P4_006-45-BT3-4___SRT-A
BreakerAC100.75 %1912.0STE1926.377.44
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
COMED_P1-2_345-L0627__B-R_SRT-A
SingleAC100.59 %1912.0STE1923.257.44

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P4_006-45-BT3-8___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_006-45-BT3-8___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.03 %
Rating:1912.0 MVA
Rating Type:STE
MVA to Mitigate:1931.75
MW Contribution:7.47
Bus #Bus NameTypeMW Contribution
274715NELSON EC;1C
50/50
3.196
274717NELSON EC;2C
50/50
3.155
274848CAMPGROVE;RU
Solar/Wind Harmer
9.274
274851PROVIDENC;RU
Solar/Wind Harmer
4.467
274855GSG-6 ;RU
Solar/Wind Harmer
5.515
274856ECOGROVE ;U1
Solar/Wind Harmer
4.801
274877BISHOP HL;1U
Solar/Wind Harmer
6.662
274878BISHOP HL;2U
Solar/Wind Harmer
6.662
274760LEE CO EC;1U
50/50
28.652
274849CRESCENT ;1U
Solar/Wind Harmer
3.087
276602WESTBROOK C
Solar/Wind Harmer
3.041
276603SUBLETTE C
Solar/Wind Harmer
3.935
276676AA2-030 GEN
50/50
3.441
274850MENDOTA H;RU
Solar/Wind Harmer
3.906
274761LEE CO EC;2U
50/50
28.553
274762LEE CO EC;3U
50/50
28.553
274763LEE CO EC;4U
50/50
28.42
274764LEE CO EC;5U
50/50
28.619
274765LEE CO EC;6U
50/50
28.751
274766LEE CO EC;7U
50/50
28.188
274767LEE CO EC;8U
50/50
28.188
276646AC1-214 GEN2
Solar/Wind Harmer
2.022
276645AC1-214 GEN1
Solar/Wind Harmer
2.022
276861AD2-134 GEN
Solar/Wind Harmer
2.666
276863AD2-134 GEN
Solar/Wind Harmer
2.666
274716NELSON EC;1S
50/50
2.34
274718NELSON EC;2S
50/50
2.34
274857EASY ROAD;U1
Solar/Wind Harmer
25.969
274858EASY ROAD;U2
Solar/Wind Harmer
25.969
938861AE1-114 GEN
Solar/Wind Harmer
18.644
946321AF1-296 GEN
Solar/Wind Harmer
33.875
959081AF2-199 GEN
Solar/Wind Harmer
2.928
959091AF2-200 GEN
Solar/Wind Harmer
5.855
961011AF2-392 GEN
Solar/Wind Harmer
42.967
971067AG2-660 GEN
Solar/Wind Harmer
11.71
971171AH1-044 GEN
Solar/Wind Harmer
5.855
971341AH1-150 GEN
Solar/Wind Harmer
5.855
971343AH1-151 GEN
Solar/Wind Harmer
5.855
971675AH1-338 GEN
Solar/Wind Harmer
0.765
971681AH1-341 GEN
Solar/Wind Harmer
1.307
276157O29GEN1
Solar/Wind Harmer
17.9
276158O29GEN2
Solar/Wind Harmer
17.9
957471AF2-041 GEN
Solar/Wind Harmer
8.783
957751AF2-069 GEN
Solar/Wind Harmer
0.617
965931AG1-462 GEN
Solar/Wind Harmer
2.976
972267AH1-718 GEN
50/50
3.644
971087AG2-675 GEN
50/50
7.469
276677AA1-146_GEN
50/50
3.441
276708O09 GEN2
Solar/Wind Harmer
15.066
276741O09 GEN1
Solar/Wind Harmer
15.066
276782AC1-033 GEN
Solar/Wind Harmer
7.53
991092J1477
External Queue
0
991303J1755 G
External Queue
5.957539081573486
CBM West 1LTFEXP_CBM-W1->PJM
CBM
56.581
CBM West 2LTFEXP_CBM-W2->PJM
CBM
26.777
CBM South 1LTFEXP_CBM-S1->PJM
CBM
4.179
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.036
NYPJM->LTFIMP_NY
CLTF
0.247
WECLTFEXP_WEC->PJM
CLTF
0.097
CPLELTFEXP_CPLE->PJM
CLTF
0.193
TVALTFEXP_TVA->PJM
CLTF
1.367
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.071
MECLTFEXP_MEC->PJM
CLTF
14.644
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.149
LAGNLTFEXP_LAGN->PJM
CLTF
4.666
SIGELTFEXP_SIGE->PJM
CLTF
0.019
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
131.348

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P4_006-45-BT3-4___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_006-45-BT3-4___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.75 %
Rating:1912.0 MVA
Rating Type:STE
MVA to Mitigate:1926.37
MW Contribution:7.44
Bus #Bus NameTypeMW Contribution
274715NELSON EC;1C
50/50
3.19
274717NELSON EC;2C
50/50
3.148
274848CAMPGROVE;RU
Solar/Wind Harmer
9.244
274851PROVIDENC;RU
Solar/Wind Harmer
4.454
274855GSG-6 ;RU
Solar/Wind Harmer
5.468
274856ECOGROVE ;U1
Solar/Wind Harmer
4.605
274877BISHOP HL;1U
Solar/Wind Harmer
6.641
274878BISHOP HL;2U
Solar/Wind Harmer
6.641
274760LEE CO EC;1U
50/50
28.591
274849CRESCENT ;1U
Solar/Wind Harmer
3.078
276602WESTBROOK C
Solar/Wind Harmer
3.015
276603SUBLETTE C
Solar/Wind Harmer
3.916
276676AA2-030 GEN
50/50
3.433
274850MENDOTA H;RU
Solar/Wind Harmer
3.873
274761LEE CO EC;2U
50/50
28.491
274762LEE CO EC;3U
50/50
28.491
274763LEE CO EC;4U
50/50
28.359
274764LEE CO EC;5U
50/50
28.558
274765LEE CO EC;6U
50/50
28.69
274766LEE CO EC;7U
50/50
28.128
274767LEE CO EC;8U
50/50
28.128
276646AC1-214 GEN2
Solar/Wind Harmer
2.016
276645AC1-214 GEN1
Solar/Wind Harmer
2.016
276861AD2-134 GEN
Solar/Wind Harmer
2.643
276863AD2-134 GEN
Solar/Wind Harmer
2.643
274716NELSON EC;1S
50/50
2.335
274718NELSON EC;2S
50/50
2.335
274857EASY ROAD;U1
Solar/Wind Harmer
25.913
274858EASY ROAD;U2
Solar/Wind Harmer
25.913
938861AE1-114 GEN
Solar/Wind Harmer
18.383
946321AF1-296 GEN
Solar/Wind Harmer
33.734
959081AF2-199 GEN
Solar/Wind Harmer
2.927
959091AF2-200 GEN
Solar/Wind Harmer
5.853
961011AF2-392 GEN
Solar/Wind Harmer
42.829
971067AG2-660 GEN
Solar/Wind Harmer
11.707
971171AH1-044 GEN
Solar/Wind Harmer
5.853
971341AH1-150 GEN
Solar/Wind Harmer
5.853
971343AH1-151 GEN
Solar/Wind Harmer
5.853
971675AH1-338 GEN
Solar/Wind Harmer
0.758
971681AH1-341 GEN
Solar/Wind Harmer
1.296
276157O29GEN1
Solar/Wind Harmer
17.848
276158O29GEN2
Solar/Wind Harmer
17.848
957471AF2-041 GEN
Solar/Wind Harmer
8.78
957751AF2-069 GEN
Solar/Wind Harmer
0.615
965931AG1-462 GEN
Solar/Wind Harmer
2.964
972267AH1-718 GEN
50/50
3.636
971087AG2-675 GEN
50/50
7.44
276677AA1-146_GEN
50/50
3.433
276708O09 GEN2
Solar/Wind Harmer
15.022
276741O09 GEN1
Solar/Wind Harmer
15.022
276782AC1-033 GEN
Solar/Wind Harmer
7.507
991092J1477
External Queue
0
991303J1755 G
External Queue
6.008668422698975
CBM West 1LTFEXP_CBM-W1->PJM
CBM
55.355
CBM West 2LTFEXP_CBM-W2->PJM
CBM
26.529
CBM South 1LTFEXP_CBM-S1->PJM
CBM
4.135
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.021
NYPJM->LTFIMP_NY
CLTF
0.246
WECLTFEXP_WEC->PJM
CLTF
0.054
CPLELTFEXP_CPLE->PJM
CLTF
0.189
TVALTFEXP_TVA->PJM
CLTF
1.353
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.071
MECLTFEXP_MEC->PJM
CLTF
14.486
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.15
LAGNLTFEXP_LAGN->PJM
CLTF
4.618
SIGELTFEXP_SIGE->PJM
CLTF
0.019
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
130.332

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0627__B-R_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L0627__B-R_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:100.59 %
Rating:1912.0 MVA
Rating Type:STE
MVA to Mitigate:1923.25
MW Contribution:7.44
Bus #Bus NameTypeMW Contribution
274715NELSON EC;1C
50/50
3.19
274717NELSON EC;2C
50/50
3.148
274848CAMPGROVE;RU
Solar/Wind Harmer
9.244
274851PROVIDENC;RU
Solar/Wind Harmer
4.454
274855GSG-6 ;RU
Solar/Wind Harmer
5.468
274856ECOGROVE ;U1
Solar/Wind Harmer
4.605
274877BISHOP HL;1U
Solar/Wind Harmer
6.641
274878BISHOP HL;2U
Solar/Wind Harmer
6.641
274760LEE CO EC;1U
50/50
28.591
274849CRESCENT ;1U
Solar/Wind Harmer
3.078
276602WESTBROOK C
Solar/Wind Harmer
3.015
276603SUBLETTE C
Solar/Wind Harmer
3.916
276676AA2-030 GEN
50/50
3.433
274850MENDOTA H;RU
Solar/Wind Harmer
3.873
274761LEE CO EC;2U
50/50
28.491
274762LEE CO EC;3U
50/50
28.491
274763LEE CO EC;4U
50/50
28.359
274764LEE CO EC;5U
50/50
28.558
274765LEE CO EC;6U
50/50
28.69
274766LEE CO EC;7U
50/50
28.128
274767LEE CO EC;8U
50/50
28.128
276646AC1-214 GEN2
Solar/Wind Harmer
2.016
276645AC1-214 GEN1
Solar/Wind Harmer
2.016
276861AD2-134 GEN
Solar/Wind Harmer
2.643
276863AD2-134 GEN
Solar/Wind Harmer
2.643
274716NELSON EC;1S
50/50
2.335
274718NELSON EC;2S
50/50
2.335
274857EASY ROAD;U1
Solar/Wind Harmer
25.913
274858EASY ROAD;U2
Solar/Wind Harmer
25.913
938861AE1-114 GEN
Solar/Wind Harmer
18.383
946321AF1-296 GEN
Solar/Wind Harmer
33.734
959081AF2-199 GEN
Solar/Wind Harmer
2.927
959091AF2-200 GEN
Solar/Wind Harmer
5.853
961011AF2-392 GEN
Solar/Wind Harmer
42.829
971067AG2-660 GEN
Solar/Wind Harmer
11.707
971171AH1-044 GEN
Solar/Wind Harmer
5.853
971341AH1-150 GEN
Solar/Wind Harmer
5.853
971343AH1-151 GEN
Solar/Wind Harmer
5.853
971675AH1-338 GEN
Solar/Wind Harmer
0.758
971681AH1-341 GEN
Solar/Wind Harmer
1.296
276157O29GEN1
Solar/Wind Harmer
17.848
276158O29GEN2
Solar/Wind Harmer
17.848
957471AF2-041 GEN
Solar/Wind Harmer
8.78
957751AF2-069 GEN
Solar/Wind Harmer
0.615
965931AG1-462 GEN
Solar/Wind Harmer
2.964
972267AH1-718 GEN
50/50
3.636
971087AG2-675 GEN
50/50
7.44
276677AA1-146_GEN
50/50
3.433
276708O09 GEN2
Solar/Wind Harmer
15.022
276741O09 GEN1
Solar/Wind Harmer
15.022
276782AC1-033 GEN
Solar/Wind Harmer
7.507
991092J1477
External Queue
0
991303J1755 G
External Queue
6.008668422698975
CBM West 1LTFEXP_CBM-W1->PJM
CBM
55.355
CBM West 2LTFEXP_CBM-W2->PJM
CBM
26.529
CBM South 1LTFEXP_CBM-S1->PJM
CBM
4.135
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.021
NYPJM->LTFIMP_NY
CLTF
0.246
WECLTFEXP_WEC->PJM
CLTF
0.054
CPLELTFEXP_CPLE->PJM
CLTF
0.189
TVALTFEXP_TVA->PJM
CLTF
1.353
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.071
MECLTFEXP_MEC->PJM
CLTF
14.486
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.15
LAGNLTFEXP_LAGN->PJM
CLTF
4.618
SIGELTFEXP_SIGE->PJM
CLTF
0.019
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
130.332
CONTINGENCY 'COMED_P4_006-45-BT3-8___SRT-A'
 TRIP BRANCH FROM BUS 270678 TO BUS 270679 CKT Z1   /*BYRON    ; B 345.0 - BYRON    ; R 345.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1    /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
CONTINGENCY 'COMED_P4_006-45-BT3-4___SRT-A'
 REMOVE UNIT 1 FROM BUS 274656                     /*BYRON    ;1U  25.0
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1   /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
CONTINGENCY 'COMED_P1-2_345-L0627__B-R_SRT-A'
 TRIP BRANCH FROM BUS 274768 TO BUS 270678 CKT 1   /*LEE CO EC;BP 345.0 - BYRON    ; B 345.0
END
957470 to 270732 ckt 1

Light Load Analysis

The New Service Request AG2-675 was evaluated as a 80.0 MW injection and 80.0 MW withdrawal in the ComEd area.

AG2-675 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 335.0 MW (80.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Short Circuit Analysis

Short Circuit analysis is not performed as part of the Phase I System Impact Study. Short Circuit analysis will commence in the Phase II System Impact Study.

Stability Analysis

Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.

Reactive Power Analysis

Reactive Power analysis is not performed as part of the Phase I System Impact Study. Reactive Power analysis will commence in the Phase II System Impact Study.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AA1-146NelsonIn Service
AA2-030NelsonIn Service
AC1-033Kewanee 138 kVIn Service
AC1-168Kewanee-StreatorSuspended
AC1-214Crescent RidgeIn Service
AD1-013Twombly Road 138kVEngineering & Procurement
AD2-134Shady OaksPartially in Service - Under Construction
AD2-172Lena 138kVIn Service
AE1-114Maryland-Lancaster 138 kVActive
AE2-035Lena 138 kVIn Service
AE2-321Belvidere-Marengo 138 kVActive
AF1-296Garden Plain 138 kVActive
AF1-331Twombley RoadEngineering & Procurement
AF2-041Nelson-Electric Junction 345 kVActive
AF2-069Crescent Ridge 138 kVActive
AF2-199Nelson-Electric Junction 345 kVActive
AF2-200Nelson-Electric Junction 345 kVActive
AF2-392Nelson-Dixon 138 kVActive
AG1-462Cordova 345 kVActive
AG2-516Pecatonica 138kVActive
AG2-660Nelson-Electric Junction 345 kVActive
AH1-044Nelson - Electric Junction 345 kVActive
AH1-047Marengo - Belvidere 138 kVActive
AH1-146White Rock - Wayne 345 kVActive
AH1-147White Rock - Wayne 345 kVActive
AH1-150Nelson-Electric Junction 345 kVActive
AH1-151Nelson-Electric Junction 345 kVActive
AH1-196Prairie 345 kVActive
AH1-234Wempletown - Paddock 345 kVActive
AH1-338McGirr Rd - Ritchie Road 138kVActive
AH1-341Stillman - Dixon 138KVActive
AH1-702Byron 345 kVActive
AH1-718Nelson 345 kVActive

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with potential Affected System impacts. PJM initiates coordination with each Affected System Operator by providing a list of New Service Requests in the Cycle with potential impacts to their respective system. If the Affected System Operator indicates an Affected System Study is required, PJM will notify the Project Developer or Eligible Customer of the need for an Affected System Study. See below if any Affected System Operator requires a study for this project:

Midcontinent Independent System Operator, Inc. (MISO)Study Pending
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

No cost allocated system reinforcements were identified for this project in the Phase I System Impact Study load flow analysis.

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
(Pending) / CE_NUN_L0627.3
Title
TC2 Network Upgrade L0627
Description
Reconductor L0527 & station conductor work at both line terminals. Possible transmission tower replacement required. This cost and timeline will be determined during PJM PH III Facility Study. The estimate provided below does not include that tower work.
Total Cost ($USD)
$30,800,000
Allocated Cost ($USD)
$0
Time Estimate
24 to 30 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG2-675 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-675 could receive cost allocation. Although AG2-675 may not presently have cost responsibility for this upgrade, AG2-675 is a potential Aggregate Pool Contributor.

FacilityContingency
BYRON ; B-LEE CO EC;BP 345.0 kV Ckt 1 line(Any)

System Reinforcement: n6639.2
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n6639.2 / CE_NUN_L15502_4
Title
Reconductor the Electric Junction 345 kV line 93407, perform sag mitigation on 345 kV line 93407, upgrade one 345 kV circuit breaker and associated motor operated disconnect switches.
Description
• Reconductor 27.2 Miles of 345kV transmission line 93407 from structure 339 to structure 454 • Perform sag mitigation on 13.5 miles of 345kV transmission line 93407 from structure 454 to TSS 111 Electric Junction • Upgrade the existing substation TSS 111 Electric Junction by replacing L.93407 CB motor-operated disconnect switches on both sides of the breaker.
Total Cost ($USD)
$146,197,759
Allocated Cost ($USD)
$0
Time Estimate
42 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AG2-675 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AG2-675 could receive cost allocation. Although AG2-675 may not presently have cost responsibility for this upgrade, AG2-675 is a potential Aggregate Pool Contributor.

FacilityContingency
ELECT JCT;1B-AF2-041 TP 345.0 kV Ckt 1 line(Any)

Attachments

AG2-675 One Line Diagram

AG2-675 One Line Diagram.pdf
The state in which the generator or merchant transmission facility is located.