AH1-260 Phase I Study Report

v1.00 released 2025-10-29 20:08

New Freedom - Monroe 230 kV

300.0 MW Capacity / 300.0 MW Energy

Introduction

This Phase I System Impact Study Report (PH1) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, sections 307 and 308 for New Service Requests (projects) in Transition Cycle 2. The Project Developer/Eligible Customer (developer) is Haddy Energy Storage LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Atlantic City Electric.

Preface

The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
  1. PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
  2. PJM will only perform load flow analysis during the Phase I System Impact Study.
  3. In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with Affected System impacts and provides each Affected System Operator with a list of New Service Request in the Cycle with potential impacts to their respective system.
  4. PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
  5. The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase I System Impact Study:
  1. Identify required Interconnection Facilities to accommodate the New Service Request.
  2. Identify required Network Upgrades to mitigate system violations from the Phase I System Impact Study.
  3. Provide planning-level preliminary estimates of Interconnection Facilities and Network Upgrades including scope, cost and elapsed time to complete the work.

Decision Point I Requirements

At the close of Phase I System Impact Study, PJM will initiate Decision Point I (DP1). During DP1, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.A.1. Additional information on these elements is available in PJM Manual 14H sections 4.4, 6, and 7.

Allowable project modifications at Decision Point I are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

General

The Project Developer has proposed a Storage facility located in the Atlantic City Electric zone — Camden County, New Jersey. The installed facilities will have a total capability of 300.0 MW with 300.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AH1-260
Project Name:
New Freedom - Monroe 230 kV
Project Developer Name:
Haddy Energy Storage LLC
State:
New Jersey
County:
Camden
Transmission Owner:
Atlantic City Electric
MFO:
300.0
MWE:
300.0
MWC:
300.0
Battery Storage Specification:
1200.0 MWh, 4.0-hr class
Grid Charging:
Yes
Fuel Type:
Storage
Basecase Study Year:
2028

Physical Interconnection Facility Study

Physical Interconnection Facilities Study is not performed as part of the Phase I System Impact Study. Physical Interconnection Facilities Study will commence in the Phase II System Impact Study.

Point of Interconnection

AH1-260 will interconnect on the Atlantic City Electric  transmission system ny tapping the New Freedom - Monroe 230 kV Line.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In the Phase I SIS, the costs shown are subject to change as a result of a facility study performed by the TO during the Phase II or Phase III System Impact Study.

Based on the Phase I SIS results, the AH1-260 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit are also shown below.

Cost Summary
DescriptionCost Allocated to AH1-260Cost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF)$1,250,000$0
Other Scope$0$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$20,500,000$20,500,000
Network Upgrades$3,807,000$3,807,000
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$0$0
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$25,557,000$24,307,000

* Contributes to calculation for Readiness Deposit #2 (RD2). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 309 (Decision Point I) A.1.a.i and PJM Manual 14H, section 6.2, Readiness Deposit #2 (RD2) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point I (DP1), the Project Developer or Eligible Customer is required to submit Readiness Deposit #2, which is calculated as 10% of cost allocation for required Phase I Network Upgrades minus Readiness Deposit #1.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Readiness Deposit #2 Due for Project AH1-260

Readiness Deposit #2 has been calculated for the project based on the Phase I System Impact Study results and is shown in the table below. This Readiness Deposit #2 must be provided at Decision Point I through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID10% of cost allocation for Phase I Network UpgradesReadiness Deposit #1 Received (RD1)Readiness Deposit #2 (RD2) for AH1-260 Project due at DP1
ABA - B
AH1-260$2,430,700$1,200,000$1,230,700

Note: Failure to provide an acceptable form of Readiness Deposit #2 by the end of Decision Point I will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Interconnection Facilities
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Provide OHT line to point of change in ownership from new substation. Install and terminate fiber from interconnection.$1,250,000 $1,250,000
Stand-Alone Network Upgrades
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Build new 4-breaker ring bus substation by cutting into the existing 2305 230KV Monroe – New Freedom line. New substation will have potential for expansion to a 6 position BAAH bus. Install 2 sources of fiber from Sickler substation located nearby requested site location$20,500,000 $20,500,000
Network Upgrades
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Extend existing transmission line Monroe - New Freedom to connect into new substation terminals. Upgrade relaying at Monroe substation.$3,500,000 $3,500,000
(Pending)Update relays at New Freedom 230kV for the incoming circuit from ACE’s Sickler station$307,000 $307,000

Based on the scope of work for the Interconnection Facilities, it is expected to take a range of 48 to 60 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.

Transmission Owner Analysis

No impacts identified by Transmission Owner

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. AEC interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AH1-260 was evaluated as a 300.0 MW (300.0 MW Capacity) injection in the AEC area.

AH1-260 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 300.0 MW (300.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Winter Peak Analysis

The New Service Request AH1-260 was evaluated as a 300.0 MW (300.0 MW Capacity) injection in the AEC area.

AH1-260 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 300.0 MW (300.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
IPDBGE/PECO
COOPER-GRACETON 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC102.03 %639.0B651.9519.02
IPDBGE/PECO
COOPER-GRACETON 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC102.02 %639.0B651.9119.01
IPDBGE/PECO
COOPER-GRACETON 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC102.0 %639.0B651.819.01
IPDBGE/PECO
COOPER-GRACETON 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC102.0 %639.0B651.819.01
GD2PJM
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
PJM500_PS_P1-2_5015_SRT-A
SingleAC109.26 %1150.0B1256.4544.87
GD2PJM
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
PJM500_PS_P2-3_HOPC_3-4_SRT-A
BreakerAC109.26 %1150.0B1256.4344.87
GD2PJM
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
DPL_P4_2_REDLION-HOPE AT50_SRT-A
BreakerAC108.14 %1150.0B1243.5743.75
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC108.18 %639.0B691.319.01
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC108.16 %639.0B691.1219.02
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC108.13 %639.0B690.9619.01
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC108.13 %639.0B690.9619.01
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC108.19 %639.0B691.3119.01
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC108.16 %639.0B691.1219.02
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC108.13 %639.0B690.9619.01
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC108.13 %639.0B690.9619.01
IPDPJM
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC101.05 %3926.0B3967.1293.58
IPDPJM
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC100.99 %3926.0B3964.7893.58
IPDPJM
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC100.99 %3926.0B3964.7893.58
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P1-2_PE-500-3835T_SRT-A
SingleAC121.22 %3700.0B4485.395.83
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P2-3_PE-500-019E_SRT-W
BreakerAC121.18 %3700.0B4483.6895.86
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P2-3_PE-500-019B_SRT-A
BreakerAC116.92 %3700.0B4326.1790.25
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
PECO_P1-2_5007_SRT-A/* $ CHESCO $ PECO_P1-2_5007 $ L
SingleAC112.2 %3700.0B4151.3996.25
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC105.92 %639.0B676.8419.01
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC105.9 %639.0B676.7219.02
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC105.88 %639.0B676.5619.01
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC105.88 %639.0B676.5619.01

Details for [AH1-260] COOPER-GRACETON 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


Base Case Flowgate

Area:BGE/PECO
Facility Description:
COOPER-GRACETON 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.03 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:651.95
MW Contribution:19.02
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.021

Details for [AH1-260] COOPER-GRACETON 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


Base Case Flowgate

Area:BGE/PECO
Facility Description:
COOPER-GRACETON 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.02 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:651.91
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] COOPER-GRACETON 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


Base Case Flowgate

Area:BGE/PECO
Facility Description:
COOPER-GRACETON 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:102.0 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:651.8
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] COOPER-GRACETON 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


Base Case Flowgate

Area:BGE/PECO
Facility Description:
COOPER-GRACETON 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.0 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:651.8
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line l/o PJM500_PS_P1-2_5015_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
Contingency Name:
PJM500_PS_P1-2_5015_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:109.26 %
Rating:1150.0 MVA
Rating Type:B
MVA to Mitigate:1256.45
MW Contribution:44.87
Bus #Bus NameTypeMW Contribution
20673828FLE_V3-070
Solar/Wind Harmer
0.023
20674628WNG_W3-110
Solar/Wind Harmer
0
20675428EAM_W2-061
Solar/Wind Harmer
0
20676328BVR_Y1-020
Solar/Wind Harmer
0
20714328BYD_X4-031
Solar/Wind Harmer
0.009
20714428HOW_X1-037
Solar/Wind Harmer
0
20720628TIN_W1-124
Solar/Wind Harmer
0
207439AE1-081 C O1
Solar/Wind Harmer
0
214067T20SOLAR
Solar/Wind Harmer
0
217206BARNGR HS C
Solar/Wind Harmer
0
217208PARK ELE C
Solar/Wind Harmer
0
217209CENTRL HS C
Solar/Wind Harmer
0
217211CAMDEN ST C
Solar/Wind Harmer
0
217213AMBOY SO C
Solar/Wind Harmer
0
232404W1-003 C
Solar/Wind Helper
0.251
232408W1-005 C
Solar/Wind Helper
0.251
232410W1-006 C
Solar/Wind Helper
0.251
232417X3-008 C
Solar/Wind Helper
0.233
232426Y1-080 FULL
Solar/Wind Helper
0.04
232428Y3-058 C
Solar/Wind Helper
0.186
217081WEATEXAS C
Solar/Wind Harmer
0
218428ETC SOLAR C
Solar/Wind Harmer
0
218438BLK ROCK C
Solar/Wind Harmer
0
218449LINSOLAR C
Solar/Wind Harmer
0
218660EHAMPSOLAR C
Solar/Wind Harmer
-0.001
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219249CENTRALDIV C
Solar/Wind Harmer
0
219276PARKLANDSO C
Solar/Wind Harmer
0
219612MATRIX C
Solar/Wind Harmer
0
219615MILLCREEK C
Solar/Wind Harmer
0
219620RIDERU C
Solar/Wind Harmer
0
219766PARADISE C
Solar/Wind Harmer
0
219817TRENTONSOL C
Solar/Wind Harmer
0
228202CUMB CT
50/50
14.881
228203P06
50/50
16.243
228206SHRMN CT
50/50
14.632
228251CARLLS#4
50/50
0.705
228727W2-039G
50/50
9.613
228732V1-021 C
50/50
0.297
232406W1-004 FULL
Solar/Wind Helper
0.251
232436AB1-176 C
Solar/Wind Helper
0.042
20742028HF_AC1-207
Solar/Wind Harmer
0
232424Y1-079 C
Solar/Wind Helper
0.105
218524CNTRALGAS1 C
Solar/Wind Harmer
0
218526CNTRALGAS2 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Helper
0.251
233939AC1-091 C
Solar/Wind Helper
0.31
233940AF2-379 C
Solar/Wind Helper
0.05
233970AC1-092 C
Solar/Wind Helper
0.31
233971AC1-093 C
Solar/Wind Helper
0.294
233972AC1-094 C
Solar/Wind Helper
0.251
233973AC2-185 C
Solar/Wind Helper
0.627
219727YARDVSOLFA C
Solar/Wind Harmer
0
219907AC1-030 C
Solar/Wind Harmer
0
228717S121
50/50
9.524
228754AB1-001 C
Solar/Wind Harmer
-0.001
230422AE1-104_GEN1
Solar/Wind Harmer
31.562
230425AE1-104_GEN2
Solar/Wind Harmer
31.562
228351V2-046C
Solar/Wind Harmer
-0.001
967451AG2-055 C O1
Solar/Wind Harmer
95.376
233944AB2-135 GEN
Solar/Wind Helper
0.691
233946AB2-136 GEN
Solar/Wind Helper
0.606
233994AC2-023 GEN
Solar/Wind Helper
0.565
234033AF1-007_GEN
Solar/Wind Helper
27.339
233982AB2-133 GEN
Solar/Wind Helper
0.576
233915AB1-141 GEN
Solar/Wind Helper
0.199
233918AB1-142 GEN
Solar/Wind Helper
0.199
233930AB2-032 GEN
Solar/Wind Helper
0.201
233987AB2-037 GEN
Solar/Wind Helper
2.089
233933AB2-153 GEN
Solar/Wind Helper
0.201
233955AB2-172 GEN
Solar/Wind Helper
0.583
233935AB2-179 C
Solar/Wind Helper
0.43
234015AF2-250 C
Solar/Wind Helper
0.025
234036AF2-325 C
Solar/Wind Helper
0.118
233990AG1-397 GEN
Solar/Wind Helper
0.126
207522AF2-254 C
Solar/Wind Harmer
0.052
207500AE2-000G1
Solar/Wind Harmer
21.201
207497AE2-000G2
Solar/Wind Harmer
21.201
207507AE2-000G3
Solar/Wind Harmer
21.201
207487AE2-000G4
Solar/Wind Harmer
21.201
233923SMA
Solar/Wind Helper
1.028
230433AD2-135 GEN
Solar/Wind Harmer
0
230430AE1-229_GEN
Solar/Wind Harmer
-0.001
219906AC1-017 C
Solar/Wind Harmer
0
219623KINSLEYBEA C
Solar/Wind Harmer
0
219258KINSLEYDEP C
Solar/Wind Harmer
0
233964AF2-378 GEN
Solar/Wind Helper
0.031
200036SALEM-G1
50/50
17.72
207511W3-106 GEN
Solar/Wind Harmer
0.013
230407AD2-065 C
Solar/Wind Harmer
0
232422X3-066 FULL
Solar/Wind Helper
0.062
232432Z2-076 GEN
Solar/Wind Helper
0.034
232434Z2-077 GEN
Solar/Wind Helper
0.065
233996TM1833_GEN
Solar/Wind Helper
0.281
233997TMININ_4.2
Solar/Wind Helper
0.281
233998TM1NIN_3.36
Solar/Wind Helper
0.281
945431AF1-208 GEN
Solar/Wind Harmer
0.323
970025AG2-016 GEN
Solar/Wind Harmer
0.104
970453AG2-297 GEN
Solar/Wind Harmer
0.154
970997AG2-616 GEN
Solar/Wind Harmer
0.349
971011AG2-627 GEN
Solar/Wind Harmer
0.258
971189AH1-054 GEN
Solar/Wind Harmer
0.042
971521AH1-258 GEN
Solar/Wind Harmer
0.084
971535AH1-265 GEN
Solar/Wind Harmer
0.205
971553AH1-274 GEN
Solar/Wind Harmer
0.127
971667AH1-334 GEN
Solar/Wind Harmer
0.098
219918AC2-009 C
Solar/Wind Harmer
0
972141AH1-641 GEN
Solar/Wind Harmer
0.105
972251AH1-710 GEN
50/50
64.616
200037SALEM-G2
50/50
17.593
200039HOPE CG1
50/50
24.45
945731AF1-238 GEN
50/50
3.054
945741AF1-239 GEN
50/50
1.832
971525AH1-260 GEN
50/50
44.874
957251AF2-019 GEN
50/50
1.25
957311AF2-025 GEN
50/50
1.181
233950AC2-186 GEN
Solar/Wind Helper
0.132
233952AC2-187 GEN
Solar/Wind Helper
0.265
233954AC2-188 GEN
Solar/Wind Helper
0.265
CBM NorthLTFEXP_CBM-N->PJM
CBM
20.692
G-007ALTFEXP_G-007A->PJM
CMTX
18.635
VFTLTFEXP_VFT->PJM
CMTX
42.94
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.773
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.457
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
3.037
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.647
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.014
MDUPJM->LTFIMP_MDU
CLTF
0

Details for HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line l/o PJM500_PS_P2-3_HOPC_3-4_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
Contingency Name:
PJM500_PS_P2-3_HOPC_3-4_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:109.26 %
Rating:1150.0 MVA
Rating Type:B
MVA to Mitigate:1256.43
MW Contribution:44.87
Bus #Bus NameTypeMW Contribution
20673828FLE_V3-070
Solar/Wind Harmer
0.023
20674628WNG_W3-110
Solar/Wind Harmer
0
20675428EAM_W2-061
Solar/Wind Harmer
0
20676328BVR_Y1-020
Solar/Wind Harmer
0
20714328BYD_X4-031
Solar/Wind Harmer
0.009
20714428HOW_X1-037
Solar/Wind Harmer
0
20720628TIN_W1-124
Solar/Wind Harmer
0
207439AE1-081 C O1
Solar/Wind Harmer
0
214067T20SOLAR
Solar/Wind Harmer
0
217206BARNGR HS C
Solar/Wind Harmer
0
217208PARK ELE C
Solar/Wind Harmer
0
217209CENTRL HS C
Solar/Wind Harmer
0
217211CAMDEN ST C
Solar/Wind Harmer
0
217213AMBOY SO C
Solar/Wind Harmer
0
232404W1-003 C
Solar/Wind Helper
0.251
232408W1-005 C
Solar/Wind Helper
0.251
232410W1-006 C
Solar/Wind Helper
0.251
232417X3-008 C
Solar/Wind Helper
0.233
232426Y1-080 FULL
Solar/Wind Helper
0.04
232428Y3-058 C
Solar/Wind Helper
0.186
217081WEATEXAS C
Solar/Wind Harmer
0
218428ETC SOLAR C
Solar/Wind Harmer
0
218438BLK ROCK C
Solar/Wind Harmer
0
218449LINSOLAR C
Solar/Wind Harmer
0
218660EHAMPSOLAR C
Solar/Wind Harmer
-0.001
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219249CENTRALDIV C
Solar/Wind Harmer
0
219276PARKLANDSO C
Solar/Wind Harmer
0
219612MATRIX C
Solar/Wind Harmer
0
219615MILLCREEK C
Solar/Wind Harmer
0
219620RIDERU C
Solar/Wind Harmer
0
219766PARADISE C
Solar/Wind Harmer
0
219817TRENTONSOL C
Solar/Wind Harmer
0
228202CUMB CT
50/50
14.881
228203P06
50/50
16.243
228206SHRMN CT
50/50
14.632
228251CARLLS#4
50/50
0.705
228727W2-039G
50/50
9.613
228732V1-021 C
50/50
0.297
232406W1-004 FULL
Solar/Wind Helper
0.251
232436AB1-176 C
Solar/Wind Helper
0.042
20742028HF_AC1-207
Solar/Wind Harmer
0
232424Y1-079 C
Solar/Wind Helper
0.105
218524CNTRALGAS1 C
Solar/Wind Harmer
0
218526CNTRALGAS2 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Helper
0.251
233939AC1-091 C
Solar/Wind Helper
0.31
233940AF2-379 C
Solar/Wind Helper
0.05
233970AC1-092 C
Solar/Wind Helper
0.31
233971AC1-093 C
Solar/Wind Helper
0.294
233972AC1-094 C
Solar/Wind Helper
0.251
233973AC2-185 C
Solar/Wind Helper
0.627
219727YARDVSOLFA C
Solar/Wind Harmer
0
219907AC1-030 C
Solar/Wind Harmer
0
228717S121
50/50
9.524
228754AB1-001 C
Solar/Wind Harmer
-0.001
230422AE1-104_GEN1
Solar/Wind Harmer
31.562
230425AE1-104_GEN2
Solar/Wind Harmer
31.562
228351V2-046C
Solar/Wind Harmer
-0.001
967451AG2-055 C O1
Solar/Wind Harmer
95.376
233944AB2-135 GEN
Solar/Wind Helper
0.691
233946AB2-136 GEN
Solar/Wind Helper
0.606
233994AC2-023 GEN
Solar/Wind Helper
0.565
234033AF1-007_GEN
Solar/Wind Helper
27.339
233982AB2-133 GEN
Solar/Wind Helper
0.576
233915AB1-141 GEN
Solar/Wind Helper
0.199
233918AB1-142 GEN
Solar/Wind Helper
0.199
233930AB2-032 GEN
Solar/Wind Helper
0.201
233987AB2-037 GEN
Solar/Wind Helper
2.089
233933AB2-153 GEN
Solar/Wind Helper
0.201
233955AB2-172 GEN
Solar/Wind Helper
0.583
233935AB2-179 C
Solar/Wind Helper
0.43
234015AF2-250 C
Solar/Wind Helper
0.025
234036AF2-325 C
Solar/Wind Helper
0.118
233990AG1-397 GEN
Solar/Wind Helper
0.126
207522AF2-254 C
Solar/Wind Harmer
0.052
207500AE2-000G1
Solar/Wind Harmer
21.201
207497AE2-000G2
Solar/Wind Harmer
21.201
207507AE2-000G3
Solar/Wind Harmer
21.201
207487AE2-000G4
Solar/Wind Harmer
21.201
233923SMA
Solar/Wind Helper
1.028
230433AD2-135 GEN
Solar/Wind Harmer
0
230430AE1-229_GEN
Solar/Wind Harmer
-0.001
219906AC1-017 C
Solar/Wind Harmer
0
219623KINSLEYBEA C
Solar/Wind Harmer
0
219258KINSLEYDEP C
Solar/Wind Harmer
0
233964AF2-378 GEN
Solar/Wind Helper
0.031
200036SALEM-G1
50/50
17.72
207511W3-106 GEN
Solar/Wind Harmer
0.013
230407AD2-065 C
Solar/Wind Harmer
0
232422X3-066 FULL
Solar/Wind Helper
0.062
232432Z2-076 GEN
Solar/Wind Helper
0.034
232434Z2-077 GEN
Solar/Wind Helper
0.065
233996TM1833_GEN
Solar/Wind Helper
0.281
233997TMININ_4.2
Solar/Wind Helper
0.281
233998TM1NIN_3.36
Solar/Wind Helper
0.281
945431AF1-208 GEN
Solar/Wind Harmer
0.323
970025AG2-016 GEN
Solar/Wind Harmer
0.104
970453AG2-297 GEN
Solar/Wind Harmer
0.154
970997AG2-616 GEN
Solar/Wind Harmer
0.349
971011AG2-627 GEN
Solar/Wind Harmer
0.258
971189AH1-054 GEN
Solar/Wind Harmer
0.042
971521AH1-258 GEN
Solar/Wind Harmer
0.084
971535AH1-265 GEN
Solar/Wind Harmer
0.205
971553AH1-274 GEN
Solar/Wind Harmer
0.127
971667AH1-334 GEN
Solar/Wind Harmer
0.098
219918AC2-009 C
Solar/Wind Harmer
0
972141AH1-641 GEN
Solar/Wind Harmer
0.105
972251AH1-710 GEN
50/50
64.616
200037SALEM-G2
50/50
17.593
200039HOPE CG1
50/50
24.45
945731AF1-238 GEN
50/50
3.054
945741AF1-239 GEN
50/50
1.832
971525AH1-260 GEN
50/50
44.874
957251AF2-019 GEN
50/50
1.25
957311AF2-025 GEN
50/50
1.181
233950AC2-186 GEN
Solar/Wind Helper
0.132
233952AC2-187 GEN
Solar/Wind Helper
0.265
233954AC2-188 GEN
Solar/Wind Helper
0.265
CBM NorthLTFEXP_CBM-N->PJM
CBM
20.692
G-007ALTFEXP_G-007A->PJM
CMTX
18.635
VFTLTFEXP_VFT->PJM
CMTX
42.94
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.773
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.457
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
3.037
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.647
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.014
MDUPJM->LTFIMP_MDU
CLTF
0

Details for HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line l/o DPL_P4_2_REDLION-HOPE AT50_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_REDLION-HOPE AT50_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.14 %
Rating:1150.0 MVA
Rating Type:B
MVA to Mitigate:1243.57
MW Contribution:43.75
Bus #Bus NameTypeMW Contribution
20673828FLE_V3-070
Solar/Wind Harmer
0.022
20674628WNG_W3-110
Solar/Wind Harmer
0
20675428EAM_W2-061
Solar/Wind Harmer
0
20676328BVR_Y1-020
Solar/Wind Harmer
0
20714328BYD_X4-031
Solar/Wind Harmer
0.009
20714428HOW_X1-037
Solar/Wind Harmer
0
20720628TIN_W1-124
Solar/Wind Harmer
0
207439AE1-081 C O1
Solar/Wind Harmer
0
214067T20SOLAR
Solar/Wind Harmer
0
217206BARNGR HS C
Solar/Wind Harmer
0
217208PARK ELE C
Solar/Wind Harmer
0
217209CENTRL HS C
Solar/Wind Harmer
0
217211CAMDEN ST C
Solar/Wind Harmer
0
217213AMBOY SO C
Solar/Wind Harmer
0
232404W1-003 C
Solar/Wind Helper
0.26
232408W1-005 C
Solar/Wind Helper
0.26
232410W1-006 C
Solar/Wind Helper
0.26
232417X3-008 C
Solar/Wind Helper
0.242
232426Y1-080 FULL
Solar/Wind Helper
0.042
232428Y3-058 C
Solar/Wind Helper
0.193
217081WEATEXAS C
Solar/Wind Harmer
0
218428ETC SOLAR C
Solar/Wind Harmer
0
218438BLK ROCK C
Solar/Wind Harmer
0
218449LINSOLAR C
Solar/Wind Harmer
0
218660EHAMPSOLAR C
Solar/Wind Harmer
-0.001
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219249CENTRALDIV C
Solar/Wind Harmer
0
219276PARKLANDSO C
Solar/Wind Harmer
0
219612MATRIX C
Solar/Wind Harmer
0
219615MILLCREEK C
Solar/Wind Harmer
0
219620RIDERU C
Solar/Wind Harmer
0
219766PARADISE C
Solar/Wind Harmer
0
219817TRENTONSOL C
Solar/Wind Harmer
0
228202CUMB CT
50/50
14.514
228203P06
50/50
15.846
228206SHRMN CT
50/50
14.269
228251CARLLS#4
50/50
0.687
228727W2-039G
50/50
9.371
228732V1-021 C
50/50
0.29
232406W1-004 FULL
Solar/Wind Helper
0.26
232436AB1-176 C
Solar/Wind Helper
0.043
20742028HF_AC1-207
Solar/Wind Harmer
0
232424Y1-079 C
Solar/Wind Helper
0.109
218524CNTRALGAS1 C
Solar/Wind Harmer
0
218526CNTRALGAS2 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Helper
0.26
233939AC1-091 C
Solar/Wind Helper
0.322
233940AF2-379 C
Solar/Wind Helper
0.052
233970AC1-092 C
Solar/Wind Helper
0.322
233971AC1-093 C
Solar/Wind Helper
0.305
233972AC1-094 C
Solar/Wind Helper
0.26
233973AC2-185 C
Solar/Wind Helper
0.65
219727YARDVSOLFA C
Solar/Wind Harmer
0
219907AC1-030 C
Solar/Wind Harmer
0
228717S121
50/50
9.283
228754AB1-001 C
Solar/Wind Harmer
-0.001
230422AE1-104_GEN1
Solar/Wind Harmer
30.78
230425AE1-104_GEN2
Solar/Wind Harmer
30.78
228351V2-046C
Solar/Wind Harmer
-0.001
967451AG2-055 C O1
Solar/Wind Harmer
92.935
233944AB2-135 GEN
Solar/Wind Helper
0.72
233946AB2-136 GEN
Solar/Wind Helper
0.629
233994AC2-023 GEN
Solar/Wind Helper
0.587
234033AF1-007_GEN
Solar/Wind Helper
28.38
233982AB2-133 GEN
Solar/Wind Helper
0.6
233915AB1-141 GEN
Solar/Wind Helper
0.208
233918AB1-142 GEN
Solar/Wind Helper
0.208
233930AB2-032 GEN
Solar/Wind Helper
0.21
233987AB2-037 GEN
Solar/Wind Helper
2.171
233933AB2-153 GEN
Solar/Wind Helper
0.21
233955AB2-172 GEN
Solar/Wind Helper
0.606
233935AB2-179 C
Solar/Wind Helper
0.451
234015AF2-250 C
Solar/Wind Helper
0.026
234036AF2-325 C
Solar/Wind Helper
0.122
233990AG1-397 GEN
Solar/Wind Helper
0.131
207522AF2-254 C
Solar/Wind Harmer
0.051
207500AE2-000G1
Solar/Wind Harmer
20.657
207497AE2-000G2
Solar/Wind Harmer
20.657
207507AE2-000G3
Solar/Wind Harmer
20.657
207487AE2-000G4
Solar/Wind Harmer
20.657
233923SMA
Solar/Wind Helper
1.067
230433AD2-135 GEN
Solar/Wind Harmer
0
230430AE1-229_GEN
Solar/Wind Harmer
-0.001
219906AC1-017 C
Solar/Wind Harmer
0
219623KINSLEYBEA C
Solar/Wind Harmer
0
219258KINSLEYDEP C
Solar/Wind Harmer
0
233964AF2-378 GEN
Solar/Wind Helper
0.032
200036SALEM-G1
50/50
17.348
207511W3-106 GEN
Solar/Wind Harmer
0.013
230407AD2-065 C
Solar/Wind Harmer
0
232422X3-066 FULL
Solar/Wind Helper
0.065
232432Z2-076 GEN
Solar/Wind Helper
0.035
232434Z2-077 GEN
Solar/Wind Helper
0.067
233996TM1833_GEN
Solar/Wind Helper
0.292
233997TMININ_4.2
Solar/Wind Helper
0.292
233998TM1NIN_3.36
Solar/Wind Helper
0.292
945431AF1-208 GEN
Solar/Wind Harmer
0.315
970025AG2-016 GEN
Solar/Wind Harmer
0.102
970453AG2-297 GEN
Solar/Wind Harmer
0.151
970997AG2-616 GEN
Solar/Wind Harmer
0.34
971011AG2-627 GEN
Solar/Wind Harmer
0.251
971189AH1-054 GEN
Solar/Wind Harmer
0.041
971521AH1-258 GEN
Solar/Wind Harmer
0.082
971535AH1-265 GEN
Solar/Wind Harmer
0.2
971553AH1-274 GEN
Solar/Wind Harmer
0.124
971667AH1-334 GEN
Solar/Wind Harmer
0.095
219918AC2-009 C
Solar/Wind Harmer
0
972141AH1-641 GEN
Solar/Wind Harmer
0.102
972251AH1-710 GEN
50/50
63.257
200037SALEM-G2
50/50
17.223
200039HOPE CG1
50/50
23.936
945731AF1-238 GEN
50/50
2.977
945741AF1-239 GEN
50/50
1.786
971525AH1-260 GEN
50/50
43.746
957251AF2-019 GEN
50/50
1.219
957311AF2-025 GEN
50/50
1.151
233950AC2-186 GEN
Solar/Wind Helper
0.138
233952AC2-187 GEN
Solar/Wind Helper
0.275
233954AC2-188 GEN
Solar/Wind Helper
0.275
CBM NorthLTFEXP_CBM-N->PJM
CBM
20.187
G-007ALTFEXP_G-007A->PJM
CMTX
18.145
VFTLTFEXP_VFT->PJM
CMTX
41.8
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.73
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.432
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
2.86
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.609
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
1.896
MDUPJM->LTFIMP_MDU
CLTF
0

Details for [AH1-260] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.18 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:691.3
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.16 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:691.12
MW Contribution:19.02
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.021

Details for [AH1-260] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.13 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:690.96
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:108.13 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:690.96
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.19 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:691.31
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.16 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:691.12
MW Contribution:19.02
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.021

Details for [AH1-260] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:108.13 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:690.96
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.13 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:690.96
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] PCHBTM1N-CHAN 500.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.05 %
Rating:3926.0 MVA
Rating Type:B
MVA to Mitigate:3967.12
MW Contribution:93.58
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
93.58

Details for [AH1-260] PCHBTM1N-CHAN 500.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:100.99 %
Rating:3926.0 MVA
Rating Type:B
MVA to Mitigate:3964.78
MW Contribution:93.58
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
93.58

Details for [AH1-260] PCHBTM1N-CHAN 500.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.99 %
Rating:3926.0 MVA
Rating Type:B
MVA to Mitigate:3964.78
MW Contribution:93.58
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
93.58

Details for [AH1-260] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P1-2_PE-500-3835T_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-3835T_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:121.22 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4485.3
MW Contribution:95.83
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
95.831

Details for [AH1-260] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P2-3_PE-500-019E_SRT-W


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-019E_SRT-W
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:121.18 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4483.68
MW Contribution:95.86
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
95.862

Details for [AH1-260] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P2-3_PE-500-019B_SRT-A


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-019B_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:116.92 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4326.17
MW Contribution:90.25
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
90.252

Details for [AH1-260] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o PECO_P1-2_5007_SRT-A/* $ CHESCO $ PECO_P1-2_5007 $ L


Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5007_SRT-A/* $ CHESCO $ PECO_P1-2_5007 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:112.2 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4151.39
MW Contribution:96.25
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
96.246

Details for [AH1-260] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.92 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:676.84
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.9 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:676.72
MW Contribution:19.02
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.021

Details for [AH1-260] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.88 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:676.56
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014

Details for [AH1-260] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:105.88 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:676.56
MW Contribution:19.01
IPD Plant:AH1-260
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.014
CONTINGENCY 'PECO_P4_PEACH235_SRT-A
 TRIP BRANCH FROM BUS 200064 TO BUS 200004 CKT 1    /*PCHBTM1S     500.0 - CNASTONE     500.0
 TRIP BRANCH FROM BUS 200064 TO BUS 200065 CKT Z1   /*PCHBTM1S     500.0 - PCHBTM2S     500.0
END
CONTINGENCY 'PJM_500_BG_P4_5_CNSTN_C_SRT-A'
 OPEN BRANCH FROM BUS 200004 TO BUS 200064 CKT 1    /*CNASTONE     500.0 - PCHBTM1S     500.0
 OPEN BRANCH FROM BUS 200004 TO BUS 200100 CKT ZC   /*CNASTONE     500.0 - CNASTCAP     500.0
END
CONTINGENCY 'PECO_P1-2_5012_SRT-A'
 TRIP BRANCH FROM BUS 200064 TO BUS 200004 CKT 1   /*PCHBTM1S     500.0 - CNASTONE     500.0
END
CONTINGENCY 'BGE_P4_GRACETON_51_SRT-A'
 OPEN BRANCH FROM BUS 200004 TO BUS 200064 CKT 1   /*CNASTONE     500.0 - PCHBTM1S     500.0
END
CONTINGENCY 'PJM500_PS_P1-2_5015_SRT-A'
 TRIP LINE FROM BUS 200027 TO BUS 200029 CKT 1   /*REDLION      500.0 - HOPE CRK     500.0
END
CONTINGENCY 'PJM500_PS_P2-3_HOPC_3-4_SRT-A'
 TRIP LINE FROM BUS 200027 TO BUS 200029 CKT 1   /*REDLION      500.0 - HOPE CRK     500.0
END
CONTINGENCY 'DPL_P4_2_REDLION-HOPE AT50_SRT-A'
 OPEN LINE FROM BUS 200027 TO BUS 200029 CIRCUIT 1   /*REDLION      500.0 - HOPE CRK     500.0
 OPEN LINE FROM BUS 200027 TO BUS 231004 CIRCUIT 1   /*REDLION      500.0 - RL_230       230.0
END
CONTINGENCY 'AP_P1-2_PE-500-3835T_SRT-A'
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
END
CONTINGENCY 'AP_P2-3_PE-500-019E_SRT-W'
 DISCONNECT BRANCH FROM BUS 235105 TO BUS 235459 CKT 1   /*01DOUBS      500.0 - 01DOUBS      230.0
 DISCONNECT BRANCH FROM BUS 235105 TO BUS 235459 CKT 3   /*01DOUBS      500.0 - 01DOUBS      230.0
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
 REMOVE SWSHUNT FROM BUS 235105 BLOCK 1 STEP 2           /*01DOUBS      500.0
END
CONTINGENCY 'AP_P2-3_PE-500-019B_SRT-A'
 DISCONNECT BRANCH FROM BUS 235105 TO BUS 200003 CKT 1   /*01DOUBS      500.0 - BRIGHTON     500.0
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
END
CONTINGENCY 'PECO_P1-2_5007_SRT-A
 TRIP BRANCH FROM BUS 200066 TO BUS 270095 CKT 1   /*PCHBTM1N     500.0 - CHAN         500.0
END
214084 to 220964 ckt 1
232012 to 232013 ckt 1
213844 to 213846 ckt 1
213846 to 213869 ckt 1
200066 to 270095 ckt 1
200064 to 200004 ckt 1
213869 to 214087 ckt 1

Light Load Analysis

The New Service Request AH1-260 was evaluated as a 300.0 MW injection and 300.0 MW withdrawal in the AEC area.

AH1-260 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 300.0 MW (300.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Short Circuit Analysis

Short Circuit analysis is not performed as part of the Phase I System Impact Study. Short Circuit analysis will commence in the Phase II System Impact Study.

Stability Analysis

Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.

Reactive Power Analysis

Reactive Power analysis is not performed as part of the Phase I System Impact Study. Reactive Power analysis will commence in the Phase II System Impact Study.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AB1-001Absecon 12 kVIn Service
AB1-141Church-Wye Mills 138 kV IIn Service
AB1-142Church-Wye Mills 138 kV IIIn Service
AB1-176Price 25kV IIEngineering & Procurement
AB2-032Church-Wye Mills 138 kVIn Service
AB2-037Keeney-Steele 230kVUnder Construction
AB2-133Chestertown 69kVUnder Construction
AB2-135Church-Kent 69kVIn Service
AB2-136Cambridge-West Cambridge 69kVUnder Construction
AB2-153Church-Wye Mills 138 kVIn Service
AB2-172Todd 69kVIn Service
AB2-179Townsend 138kVIn Service
AC1-017Levittown 13 kVIn Service
AC1-030Cinnaminson 13kVIn Service
AC1-091Cedar Creek 138kV IEngineering & Procurement
AC1-092Cedar Creek 138kV IIEngineering & Procurement
AC1-093Cedar Creek 138kV IIIEngineering & Procurement
AC1-094Cedar Creek 138kV IVEngineering & Procurement
AC2-009Pennington 13 kVIn Service
AC2-023Hebron 69kVEngineering & Procurement
AC2-185Cedar Creek 138kV IIEngineering & Procurement
AC2-186Harrington 25kVUnder Construction
AC2-187Harrington 69kVUnder Construction
AC2-188Harrington 69 kVUnder Construction
AD2-065Atco 12 kVIn Service
AD2-135Williamstown 12kVPartially in Service - Under Construction
AE1-081Landing 12.47 kVIn Service
AE1-104BL England 138 kVSuspended
AE1-229Deepwater-Upper Pittsgrove 138 kVSuspended
AF1-007Indian River 230 kV ISuspended
AF1-208Laurel-Roadstown 69 kVWithdrawn
AF1-238Sherman Ave - West Vineland 69 kVActive
AF1-239Sherman Ave - West Vineland 69 kVEngineering & Procurement
AF2-019Middle 69 kVEngineering & Procurement
AF2-025Ontario 69 kVEngineering & Procurement
AF2-250Edgewood 12 kV IIIIn Service
AF2-254Cookstown-New Lisbon 34.5 kVSuspended
AF2-325Jacktown 12 kVEngineering & Procurement
AF2-378Cambridge 12 kVEngineering & Procurement
AF2-379Princess Anne 25 kVUnder Construction
AG1-397Walston 12 kVWithdrawn
AG2-016Oyster Creek-Whitings 34.5 kVActive
AG2-055Deans 500 kVWithdrawn
AG2-297Cumberland 230 kVActive
AG2-616Churchtown - Upper Pittsgrove 138 kVActive
AG2-627Woodstown-High Street 69 kVActive
AH1-054Upton-Whitings 34.5 kVActive
AH1-258Belford - Keansburg 34.5 kVActive
AH1-265Winslow - Monroe 69kVActive
AH1-274Butler 69 kVActive
AH1-334Lakehurst - Whitings 34.5 kVActive
AH1-641Churchtown - Upper Pittsgrove 138kVActive
AH1-710Salem 500kVActive
V1-021Cape May County 12kVIn Service
V2-046Pilesgrove Township 12kVIn Service
W1-003Oak HallIn Service
W1-004Oak HallIn Service
W1-005Oak HallIn Service
W1-006Oak HallIn Service
W2-039Clayville 69kVIn Service
W3-106Sussex-Wykertown 34.5kVIn Service
X3-008Todd 69kVIn Service
X3-066Church Hill 69kVIn Service
Y1-079Wye Mills 69kVIn Service
Y1-080Dorchester 12kVIn Service
Y3-058Rockawalkin 69kVIn Service
Z2-076Worcester South 25kVIn Service
Z2-077Worcester North 25kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with potential Affected System impacts. PJM initiates coordination with each Affected System Operator by providing a list of New Service Requests in the Cycle with potential impacts to their respective system. If the Affected System Operator indicates an Affected System Study is required, PJM will notify the Project Developer or Eligible Customer of the need for an Affected System Study. See below if any Affected System Operator requires a study for this project:

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

No cost allocated system reinforcements were identified for this project in the Phase I System Impact Study load flow analysis.

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: b3737.50
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3737.50
Title
Bring the Peach Bottom-Delta Power Plant 500 kV line “in and out” of North Delta
Description
Bring the Peach Bottom-Delta Power Plant 500 kV line “in and out” of North Delta by constructing a new Peach Bottom-North Delta 500 kV (0.3 miles) cut-in and cut-out lines.
Cost Information
Time Estimate
Jun 01 2029

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.11
Type
Load Flow
TO
PEPCO
RTEP ID / TO ID
b3780.11
Title
Brighton Statcom and Capacitor (Projected ISD 12/31/2028)
Description
Brighton Statcom and capacitor New STATCOM rating: 350 MVAR New capacitor rating: 350 MVAR
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.5
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.5
Title
Build Solley Road substation + Statcom (Projected ISD 12/31/2028)
Description
Build Solley Road substation + Statcom. New STATCOM rating: 350 MVAR Add 4x 230 kV breakers bays.
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.26
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.26
Title
Build High Ridge 500 kV substation - Three bay breaker and half configuration (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.27
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.27
Title
High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) - Waugh Chapel side (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.29
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.29
Title
High Ridge termination for the North Delta-High Ridge 500 kV line (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.30
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.30
Title
High Ridge - Install two 500/230 kV transformers (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.31
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.31
Title
Build new North Delta-High Ridge 500 kV line - PECO Portion (Projected ISD 12/1/2030)
Description
None
Cost Information
Time Estimate
Dec 01 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.32
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.32
Title
Build new North Delta-High Ridge 500 kV line - BGE Portion (Projected ISD 12/31/2030)
Description
Build new North Delta-High Ridge 500 kV line. (~59 miles)
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.44
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.44
Title
North Delta termination for the North Delta-High Ridge 500 line (PECO work).
Description
None
Cost Information
Time Estimate
Dec 01 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.48
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.48
Title
North Delta termination for the North Delta-High Ridge 500 line (Transource work).
Description
None
Cost Information
Time Estimate
Dec 15 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.49
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.49
Title
North Delta 500 kV termination for the Calpine generator (Calpine/Transource work).
Description
None
Cost Information
Time Estimate
Oct 06 2027

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.13
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.13
Title
Batavia Road to Riverside 230 kV reconductor
Description
Batavia Road to Riverside 230 kV reconductor New rating: 1941 MVA SN / 2181 MVA SE
Cost Information
Time Estimate
Dec 31 2027

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.36
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.36
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV (Projected ISD 12/31/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.33
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.33
Title
Replace terminal equipment limitations at Brighton 500 kV - on the existing Brighton-Waugh Chapel 500 kV (5053) or new Brighton-High Ridge 500 kV.
Description
None
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.1
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.1
Title
Peach Bottom North upgrades – substation work (Projected ISD 12/31/2028)
Description
Add 3x 500 kV breakers to form a breaker-and-a-half bay.
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.15
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.15
Title
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub
Description
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV substation by rebuilding 5012 between new terminal at Peach Bottom South and North Delta on single circuit structures and terminating at North Delta.
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.17
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.17
Title
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub (Transource)
Description
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV substation by rebuilding 5012 between new terminal at Peach Bottom South and North Delta on single circuit structures and terminating at North Delta (Transource Scope).
Cost Information
Time Estimate
May 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.8
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.8
Title
Graceton 500 kV substation expansion (Projected ISD 12/31/2028)
Description
Add 3x 500 kV breaker bays, 2x 500/230 kV auto transformer, 1x 500 kV caps
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.34
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.34
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV and cut into North Delta 500kV (Projected ISD 12/31/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.35
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.35
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV (Projected ISD 12/1/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 01 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.37
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.37
Title
Replace terminal equipment limitations at Conastone 500 kV - on the (existing Peach Bottom-Conastone) or (new Graceton-Conastone) 500 kV line (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.14
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.14
Title
Reconfigure Cooper transmission feeds by establishing new Cooper-North Delta 230 kV line and rerouting existing transmissions lines by Cooper.
Description
None
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.16
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.16
Title
Terminate new Cooper-North Delta 230 kV line (Transource Scope) at North Delta 230 kV
Description
None
Cost Information
Time Estimate
Oct 15 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.6
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.6
Title
Build Granite substation + Statcom (Projected ISD 12/31/2028)
Description
Build Granite substation + Statcom. New STATCOM rating: 350 MVAR. Add 4x 230 kV breaker bays.
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.7
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.7
Title
Build new Batavia Road substation (Projected ISD 12/31/2028)
Description
Build Batavia Road substation. Add 4 x 230kV breaker bays
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.9
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.9
Title
Graceton to Batavia Road 230 kV double circuit pole line (Projected ISD 12/31/2028)
Description
Graceton to Batavia Road 230 kV double circuit pole line New rating: 1331 MVA SN/ 1594 MVA SE
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.28
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.28
Title
High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) -Brighton side (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3737.47
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3737.47
Title
Build New North Delta 500 kV substation (Four bay breaker and half configuration)
Description
Build New North Delta 500 kV substation (four bay breaker and half configuration) - the substation will include 12 - 500kV breakers and one 500/230 kV transformer, will allow the termination of six - 500 kV lines
Cost Information
Time Estimate
Oct 15 2027

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.50
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.50
Title
North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (Transource work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Jan 23 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3737.37
Type
Load Flow
TO
LS Power
RTEP ID / TO ID
b3737.37
Title
Silver Run-Hope Creek 230kV Expansion (Projected ISD 6/1/2029)
Description
Add a third set of submarine cables, rerate the overhead segment, and upgrade terminal equipment to achieve a higher rating for the Silver Run-Hope Creek 230 kV line.
Cost Information
Time Estimate
Jun 01 2029

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.42
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.42
Title
Peach Bottom 500kV North bus upgrade (Projected ISD 12/1/2030)
Description
Peach Bottom 500kV North bus upgrade - Replace 11 – Instances of strain bus conductor used for breaker drops or CT drops, 7 – 500 kV disconnect switches, 7 – Free Standing CTs, 1 – 500 kV breaker, 2 – Breaker relays or meters.
Cost Information
Time Estimate
Dec 01 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.52
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.52
Title
Reconfigure Peach Bottom North and South 500 kV yards (Projected ISD 12/1/2030)
Description
Reconfigure Peach Bottom North and South yards to allow for termination of 500 kV lines from Peach Bottom to North Delta. North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line.
Cost Information
Time Estimate
Dec 01 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.2
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.2
Title
Peach Bottom to Graceton (PECO Portion) – New 500kV Line
Description
Peach Bottom to Graceton (PECO Portion) – New 500kV Line. New rating: 4503 MVA SN/ 5022 MVA SE. This is a baseline identified for the announced Brandon Shores deactivation.
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3780.4
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.4
Title
Peach Bottom to Graceton (BGE Portion) – New 500kV Line
Description
New rating: 4503 MVA SN/ 5022 MVA SE. This is a baseline identified for the announced Brandon Shores deactivation.
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.45
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.45
Title
North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (PECO work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Dec 01 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.46
Type
Load Flow
TO
PEPCO
RTEP ID / TO ID
b3800.46
Title
North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (PECO work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Dec 01 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.47
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.47
Title
Build new Peach Bottom South-North Delta 500 kV line (Projected ISD 12/1/2030)
Description
Build new Peach Bottom South-North Delta 500 kV line – cut in to Peach Bottom tie No. 1 and extending line to North Delta (~1.25 miles new ROW).
Cost Information
Time Estimate
Dec 01 2030

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)

System Reinforcement: b3800.51
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.51
Title
North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (Transource work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
May 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)

Attachments

AH1-260 One Line Diagram

AH1-260 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.