AH1-426A Phase I Study Report

v1.00 released 2025-10-29 20:50

Gilboa-Jones Branch 138 kV V

32.3 MW Capacity / 32.3 MW Energy

Introduction

This Phase I System Impact Study Report (PH1) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, sections 307 and 308 for New Service Requests (projects) in Transition Cycle 2. The Project Developer/Eligible Customer (developer) is Nicholas County Solar Project, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Monongahela Power Company.

Preface

The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
  1. PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
  2. PJM will only perform load flow analysis during the Phase I System Impact Study.
  3. In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with Affected System impacts and provides each Affected System Operator with a list of New Service Request in the Cycle with potential impacts to their respective system.
  4. PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
  5. The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase I System Impact Study:
  1. Identify required Interconnection Facilities to accommodate the New Service Request.
  2. Identify required Network Upgrades to mitigate system violations from the Phase I System Impact Study.
  3. Provide planning-level preliminary estimates of Interconnection Facilities and Network Upgrades including scope, cost and elapsed time to complete the work.

Decision Point I Requirements

At the close of Phase I System Impact Study, PJM will initiate Decision Point I (DP1). During DP1, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.A.1. Additional information on these elements is available in PJM Manual 14H sections 4.4, 6, and 7.

Allowable project modifications at Decision Point I are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

General

The Project Developer has proposed an uprate to a planned/existing Storage facility located in the Monongahela Power Company zone — Nicholas County, West Virginia. This project is an increase to the developer’s AH1-426 project(s), which will share the same Point of Interconnection. The AH1-426A project is a 32.3 MW uprate (32.3 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 96.9 MW with 96.9 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AH1-426A
Project Name:
Gilboa-Jones Branch 138 kV V
Project Developer Name:
Nicholas County Solar Project, LLC
State:
West Virginia
County:
Nicholas
Transmission Owner:
Monongahela Power Company
MFO:
96.9
MWE:
32.3
MWC:
32.3
Battery Storage Specification:
129.2 MWh, 4.0-hr class
Grid Charging:
Yes
Fuel Type:
Storage
Basecase Study Year:
2028

Physical Interconnection Facility Study

Physical Interconnection Facilities Study is not performed as part of the Phase I System Impact Study. Physical Interconnection Facilities Study will commence in the Phase II System Impact Study.

Point of Interconnection

AH1-426A will interconnect on the Alleghany Power Company transmission system on the Carbondale - Gilboa 138 kV line between Gilboa and Jones Branch by connecting to the future AF2-311/AF2-316 interconnection switchyard as an uprate AH1-426.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In the Phase I SIS, the costs shown are subject to change as a result of a facility study performed by the TO during the Phase II or Phase III System Impact Study.

Based on the Phase I SIS results, the AH1-426A project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit are also shown below.

Cost Summary
DescriptionCost Allocated to AH1-426ACost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF)$411,814$0
Other Scope$29,800$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0
Network Upgrades$1,775,242$1,775,242
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$30,072,346$30,072,346
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$32,289,202$31,847,589

* Contributes to calculation for Readiness Deposit #2 (RD2). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 309 (Decision Point I) A.1.a.i and PJM Manual 14H, section 6.2, Readiness Deposit #2 (RD2) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point I (DP1), the Project Developer or Eligible Customer is required to submit Readiness Deposit #2, which is calculated as 10% of cost allocation for required Phase I Network Upgrades minus Readiness Deposit #1.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Readiness Deposit #2 Due for Project AH1-426A

Readiness Deposit #2 has been calculated for the project based on the Phase I System Impact Study results and is shown in the table below. This Readiness Deposit #2 must be provided at Decision Point I through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID10% of cost allocation for Phase I Network UpgradesReadiness Deposit #1 Received (RD1)Readiness Deposit #2 (RD2) for AH1-426A Project due at DP1
ABA - B
AH1-426A$3,184,759$129,200$3,055,559

Note: Failure to provide an acceptable form of Readiness Deposit #2 by the end of Decision Point I will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Interconnection Facilities
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Construct one span of 138kV circuit from the AF2-311/AF2-316 substation to the Point of Change in Ownership outside the substation.$761,047 $380,524 (See Note 1)
(Pending)Integrate Interconnection Facilities protection and controls to the Transmission Owner system.$62,580 $31,290 (See Note 1)
Network Upgrades
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Expand the proposed AF2-311/AF2-316 substation, add one (1) new circuit breaker with SCADA controls.$3,550,485 $1,775,242 (See Note 1)
Physical Interconnection
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)Install revenue metering on AH1-426 terminal at the AF2-311/AF2-316 substation.$59,600 $29,800 (See Note 1)

Based on the scope of work for the Interconnection Facilities, it is expected to take 38 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.

Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.

Transmission Owner Analysis

FE performed an analysis of its underlying transmission system <100 kV. New Service Request Project AH1-426Adid not contribute to any overloads on the FE transmission <100 kV system.

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. FirstEnergy interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AH1-426A was evaluated as a 32.3 MW (32.3 MW Capacity) injection in the APS area.

AH1-426A was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 96.9 MW (32.3 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-024_SRT-A
BusAC125.73 %209.0B262.785.09
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-084T_SRT-A
BreakerAC125.71 %209.0B262.745.09
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-083_SRT-A
BreakerAC125.71 %209.0B262.735.09
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-082_SRT-A
BreakerAC125.03 %209.0B261.315.09
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-088_SRT-A
BusAC118.03 %209.0B246.684.46
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-111_SRT-A
BreakerAC118.0 %209.0B246.624.46
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-070_SRT-A
BusAC112.08 %209.0B234.244.23
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-113_SRT-A
BreakerAC111.26 %209.0B232.544.23
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-069_SRT-A
BusAC110.93 %209.0B231.854.23
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AEP_P2-2_#16040_05CARBND 138_1_SRT-A
BusAC105.05 %209.0B219.556.11
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AEP_P7-1_#10944___SRT-A
TowerAC102.12 %209.0B213.433.4
GD2AP
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
AP_P7-1_MP-138-015_SRT-A
TowerAC101.95 %209.0B213.073.74
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC175.85 %106.0B186.44.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC175.35 %106.0B185.874.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC174.78 %106.0B185.274.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-023_SRT-A
BusAC166.4 %106.0B176.394.24
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-016_SRT-A
BreakerAC166.37 %106.0B176.354.24
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-018_SRT-A
BreakerAC166.37 %106.0B176.354.24
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-015_SRT-A
BreakerAC165.71 %106.0B175.664.24
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P1-2_MP-138-048_SRT-A
SingleAC149.46 %106.0B158.424.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P1-2_MP-138-049_SRT-A
SingleAC148.39 %106.0B157.294.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-032_SRT-A
BusAC148.03 %106.0B156.914.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-021_SRT-A
BreakerAC144.97 %106.0B153.674.37
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-006_SRT-A
BusAC144.89 %106.0B153.594.37
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Base Case
SingleAC125.95 %85.0A107.063.32
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P7-1_MP-138-015_SRT-A
TowerAC123.97 %106.0B131.413.73
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AEP_P7-1_#10944___SRT-A
TowerAC120.58 %106.0B127.823.33
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P2-2_MP-138-024_SRT-A
BusAC125.21 %213.0B266.75.09
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P2-3_MP-138-084T_SRT-A
BreakerAC125.2 %213.0B266.675.09
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P2-3_MP-138-083_SRT-A
BreakerAC125.19 %213.0B266.655.09
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P2-3_MP-138-082_SRT-A
BreakerAC124.52 %213.0B265.225.09
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P2-2_MP-138-088_SRT-A
BusAC117.65 %213.0B250.594.46
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P2-3_MP-138-111_SRT-A
BreakerAC117.62 %213.0B250.534.46
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P2-2_MP-138-070_SRT-A
BusAC111.81 %213.0B238.154.23
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P2-3_MP-138-113_SRT-A
BreakerAC111.0 %213.0B236.444.23
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P2-2_MP-138-069_SRT-A
BusAC110.68 %213.0B235.754.23
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AEP_P2-2_#16040_05CARBND 138_1_SRT-A
BusAC104.93 %213.0B223.56.11
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AEP_P7-1_#10944___SRT-A
TowerAC102.05 %213.0B217.373.4
GD2AP
01COWEN-01BACKFK 138.0 kV Ckt 1 line
AP_P7-1_MP-138-015_SRT-A
TowerAC101.88 %213.0B217.013.74
GD2AP
01ENONTP-01POWELM 138.0 kV Ckt 1 line
AP_P2-2_MP-138-017A_SRT-A
BusAC103.46 %244.0B252.4413.47
GD2AP
01ENONTP-01POWELM 138.0 kV Ckt 1 line
AP_P2-3_MP-138-169T_SRT-A
BreakerAC103.44 %244.0B252.3813.47
GD2AP
01ENONTP-01POWELM 138.0 kV Ckt 1 line
AP_P2-3_MP-138-168T_SRT-A
BreakerAC103.42 %244.0B252.3513.47
GD2AP
01HEATER-01FRNCHC 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC107.17 %128.0B137.183.75
GD2AP
01HEATER-01FRNCHC 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC106.8 %128.0B136.73.75
GD2AP
01HEATER-01FRNCHC 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC106.41 %128.0B136.23.75
GD2AP
01NETTIE-01CRUPRN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-024_SRT-A
BusAC104.04 %192.0B199.764.78
GD2AP
01NETTIE-01CRUPRN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-084T_SRT-A
BreakerAC104.03 %192.0B199.734.78
GD2AP
01NETTIE-01CRUPRN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-083_SRT-A
BreakerAC104.02 %192.0B199.714.78
GD2AP
01NETTIE-01CRUPRN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-082_SRT-A
BreakerAC103.35 %192.0B198.434.77
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC146.16 %128.0B187.094.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC145.74 %128.0B186.554.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC145.27 %128.0B185.954.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-2_MP-138-023_SRT-A
BusAC138.46 %128.0B177.234.24
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-3_MP-138-016_SRT-A
BreakerAC138.43 %128.0B177.194.24
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-3_MP-138-018_SRT-A
BreakerAC138.43 %128.0B177.194.24
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-3_MP-138-015_SRT-A
BreakerAC137.91 %128.0B176.524.24
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P1-2_MP-138-048_SRT-A
SingleAC124.32 %128.0B159.124.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P1-2_MP-138-049_SRT-A
SingleAC123.42 %128.0B157.974.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-2_MP-138-032_SRT-A
BusAC123.13 %128.0B157.614.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-3_MP-138-021_SRT-A
BreakerAC120.63 %128.0B154.414.37
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-2_MP-138-006_SRT-A
BusAC120.57 %128.0B154.334.37
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P7-1_MP-138-015_SRT-A
TowerAC107.7 %128.0B137.853.73
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AEP_P7-1_#10944___SRT-A
TowerAC104.9 %128.0B134.273.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
Base Case
SingleAC102.06 %107.0A109.213.32
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC138.6 %106.0B146.913.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC138.12 %106.0B146.43.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC137.63 %106.0B145.883.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-2_MP-138-023_SRT-A
BusAC129.28 %106.0B137.033.66
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-3_MP-138-016_SRT-A
BreakerAC129.25 %106.0B137.03.66
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-3_MP-138-018_SRT-A
BreakerAC129.25 %106.0B137.03.66
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-3_MP-138-015_SRT-A
BreakerAC128.68 %106.0B136.413.66
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P1-2_MP-138-048_SRT-A
SingleAC115.75 %106.0B122.73.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P1-2_MP-138-049_SRT-A
SingleAC114.78 %106.0B121.673.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-2_MP-138-032_SRT-A
BusAC114.52 %106.0B121.393.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-3_MP-138-021_SRT-A
BreakerAC111.97 %106.0B118.683.78
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-2_MP-138-006_SRT-A
BusAC111.9 %106.0B118.613.79
GD2AP
01SUTTON-01HEATER 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC111.26 %128.0B142.413.75
GD2AP
01SUTTON-01HEATER 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC110.86 %128.0B141.93.75
GD2AP
01SUTTON-01HEATER 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC110.46 %128.0B141.393.75
GD2AP
01SUTTON-01HEATER 138.0 kV Ckt 1 line
AP_P2-2_MP-138-023_SRT-A
BusAC103.54 %128.0B132.533.66
GD2AP
01SUTTON-01HEATER 138.0 kV Ckt 1 line
AP_P2-3_MP-138-016_SRT-A
BreakerAC103.51 %128.0B132.53.66
GD2AP
01SUTTON-01HEATER 138.0 kV Ckt 1 line
AP_P2-3_MP-138-018_SRT-A
BreakerAC103.51 %128.0B132.53.66
GD2AP
01SUTTON-01HEATER 138.0 kV Ckt 1 line
AP_P2-3_MP-138-015_SRT-A
BreakerAC103.04 %128.0B131.93.66
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC140.95 %128.0B180.414.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC140.53 %128.0B179.884.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC140.06 %128.0B179.284.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-2_MP-138-023_SRT-A
BusAC133.25 %128.0B170.564.24
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-3_MP-138-018_SRT-A
BreakerAC133.21 %128.0B170.514.24
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-3_MP-138-016_SRT-A
BreakerAC133.21 %128.0B170.514.24
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-3_MP-138-015_SRT-A
BreakerAC132.68 %128.0B169.834.24
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P1-2_MP-138-048_SRT-A
SingleAC119.09 %128.0B152.444.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P1-2_MP-138-049_SRT-A
SingleAC118.21 %128.0B151.314.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-2_MP-138-032_SRT-A
BusAC117.91 %128.0B150.934.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-3_MP-138-021_SRT-A
BreakerAC115.46 %128.0B147.794.37
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-2_MP-138-006_SRT-A
BusAC115.39 %128.0B147.74.37
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P7-1_MP-138-015_SRT-A
TowerAC102.56 %128.0B131.283.73
GD2AP
AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line
AEP_P4_#2942_05KAMMER 765_PP_SRT-A
BreakerAC100.83 %314.0B316.6116.24
GD2AP
AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line
AP_P2-3_MP-500-020_SRT-SL
BreakerAC100.63 %314.0B315.9916.23
GD2AP
AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line
AP_P2-3_MP-500-021_SRT-SL
BreakerAC100.63 %314.0B315.9716.24
GD2AP
AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line
AEP_P4_#37_05MOUNTN 765_B1_SRT-A
BreakerAC100.62 %314.0B315.9616.24

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-024_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-024_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:125.73 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:262.78
MW Contribution:5.09
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.029
960251AF2-316 GEN
Solar/Wind Harmer
20.327
960201AF2-311 GEN
Solar/Wind Harmer
13.551
971817AH1-426 GEN
50/50
10.179
971819AH1-426A GEN
50/50
5.09
971061AG2-657 GEN
Solar/Wind Harmer
4.628
270132AB1-180 C
Adder
0.054
971063AG2-658 GEN
Solar/Wind Harmer
85.57
238114M24_2
Solar/Wind Harmer
6.305
23751101LEADS_P59
Solar/Wind Helper
1.086
235780M24_1
Solar/Wind Harmer
7.783
NYPJM->LTFIMP_NY
CLTF
0.239
LGEELTFEXP_LGEE->PJM
CLTF
0.351
WECLTFEXP_WEC->PJM
CLTF
0.168
CPLELTFEXP_CPLE->PJM
CLTF
0.346
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.524
LAGNLTFEXP_LAGN->PJM
CLTF
0.996
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.241
TVALTFEXP_TVA->PJM
CLTF
0.519
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.919
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.944
MECLTFEXP_MEC->PJM
CLTF
0.768
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-084T_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-084T_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:125.71 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:262.74
MW Contribution:5.09
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.029
960251AF2-316 GEN
Solar/Wind Harmer
20.327
960201AF2-311 GEN
Solar/Wind Harmer
13.551
971063AG2-658 GEN
Solar/Wind Harmer
85.57
238114M24_2
Solar/Wind Harmer
6.305
23751101LEADS_P59
Solar/Wind Helper
1.086
235780M24_1
Solar/Wind Harmer
7.783
971817AH1-426 GEN
50/50
10.179
971819AH1-426A GEN
50/50
5.09
971061AG2-657 GEN
Solar/Wind Harmer
4.628
270132AB1-180 C
Adder
0.054
NYPJM->LTFIMP_NY
CLTF
0.239
LGEELTFEXP_LGEE->PJM
CLTF
0.351
WECLTFEXP_WEC->PJM
CLTF
0.168
CPLELTFEXP_CPLE->PJM
CLTF
0.346
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.524
LAGNLTFEXP_LAGN->PJM
CLTF
0.996
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.241
TVALTFEXP_TVA->PJM
CLTF
0.519
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.919
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.944
MECLTFEXP_MEC->PJM
CLTF
0.768
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-083_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-083_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:125.71 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:262.73
MW Contribution:5.09
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.029
960251AF2-316 GEN
Solar/Wind Harmer
20.327
960201AF2-311 GEN
Solar/Wind Harmer
13.551
971063AG2-658 GEN
Solar/Wind Harmer
85.57
238114M24_2
Solar/Wind Harmer
6.305
23751101LEADS_P59
Solar/Wind Helper
1.086
235780M24_1
Solar/Wind Harmer
7.783
971817AH1-426 GEN
50/50
10.179
971819AH1-426A GEN
50/50
5.09
971061AG2-657 GEN
Solar/Wind Harmer
4.628
270132AB1-180 C
Adder
0.054
NYPJM->LTFIMP_NY
CLTF
0.239
LGEELTFEXP_LGEE->PJM
CLTF
0.351
WECLTFEXP_WEC->PJM
CLTF
0.168
CPLELTFEXP_CPLE->PJM
CLTF
0.346
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.524
LAGNLTFEXP_LAGN->PJM
CLTF
0.996
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.241
TVALTFEXP_TVA->PJM
CLTF
0.519
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.919
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.944
MECLTFEXP_MEC->PJM
CLTF
0.768
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-082_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-082_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:125.03 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:261.31
MW Contribution:5.09
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.57
237033AB1-150 GEN
Solar/Wind Harmer
5.025
960251AF2-316 GEN
Solar/Wind Harmer
20.313
960201AF2-311 GEN
Solar/Wind Harmer
13.542
971817AH1-426 GEN
50/50
10.172
971819AH1-426A GEN
50/50
5.086
971061AG2-657 GEN
Solar/Wind Harmer
4.625
270132AB1-180 C
Adder
0.054
971063AG2-658 GEN
Solar/Wind Harmer
85.51
238114M24_2
Solar/Wind Harmer
6.3
23751101LEADS_P59
Solar/Wind Helper
1.087
235780M24_1
Solar/Wind Harmer
7.778
NYPJM->LTFIMP_NY
CLTF
0.239
LGEELTFEXP_LGEE->PJM
CLTF
0.351
WECLTFEXP_WEC->PJM
CLTF
0.168
CPLELTFEXP_CPLE->PJM
CLTF
0.346
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.52
LAGNLTFEXP_LAGN->PJM
CLTF
0.995
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.24
TVALTFEXP_TVA->PJM
CLTF
0.519
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.916
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.943
MECLTFEXP_MEC->PJM
CLTF
0.767
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-088_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-088_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:118.03 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:246.68
MW Contribution:4.46
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
8.927
971819AH1-426A GEN
50/50
4.463
971061AG2-657 GEN
Solar/Wind Harmer
4.188
24446705SUMMERVL
50/50
0.46
237033AB1-150 GEN
Solar/Wind Harmer
3.942
960251AF2-316 GEN
Solar/Wind Harmer
17.826
960201AF2-311 GEN
Solar/Wind Harmer
11.884
971063AG2-658 GEN
Solar/Wind Harmer
73.167
238114M24_2
Solar/Wind Harmer
4.942
23751101LEADS_P59
Solar/Wind Helper
1.206
23562501BACKB
Solar/Wind Helper
0.424
235780M24_1
Solar/Wind Harmer
6.101
NYPJM->LTFIMP_NY
CLTF
0.244
LGEELTFEXP_LGEE->PJM
CLTF
0.359
WECLTFEXP_WEC->PJM
CLTF
0.173
CPLELTFEXP_CPLE->PJM
CLTF
0.322
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.58
LAGNLTFEXP_LAGN->PJM
CLTF
0.992
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.182
TVALTFEXP_TVA->PJM
CLTF
0.515
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.148
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.938
MECLTFEXP_MEC->PJM
CLTF
0.786
SIGELTFEXP_SIGE->PJM
CLTF
0.027

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-111_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-111_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:118.0 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:246.62
MW Contribution:4.46
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
8.927
971819AH1-426A GEN
50/50
4.463
971061AG2-657 GEN
Solar/Wind Harmer
4.188
971063AG2-658 GEN
Solar/Wind Harmer
73.167
238114M24_2
Solar/Wind Harmer
4.942
23751101LEADS_P59
Solar/Wind Helper
1.206
23562501BACKB
Solar/Wind Helper
0.424
24446705SUMMERVL
50/50
0.46
237033AB1-150 GEN
Solar/Wind Harmer
3.942
960251AF2-316 GEN
Solar/Wind Harmer
17.826
960201AF2-311 GEN
Solar/Wind Harmer
11.884
235780M24_1
Solar/Wind Harmer
6.101
NYPJM->LTFIMP_NY
CLTF
0.244
LGEELTFEXP_LGEE->PJM
CLTF
0.359
WECLTFEXP_WEC->PJM
CLTF
0.173
CPLELTFEXP_CPLE->PJM
CLTF
0.322
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.58
LAGNLTFEXP_LAGN->PJM
CLTF
0.992
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.182
TVALTFEXP_TVA->PJM
CLTF
0.515
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.148
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.938
MECLTFEXP_MEC->PJM
CLTF
0.786
SIGELTFEXP_SIGE->PJM
CLTF
0.027

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-070_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-070_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:112.08 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:234.24
MW Contribution:4.23
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.443
237033AB1-150 GEN
Solar/Wind Harmer
3.806
960251AF2-316 GEN
Solar/Wind Harmer
16.887
960201AF2-311 GEN
Solar/Wind Harmer
11.258
971817AH1-426 GEN
50/50
8.456
971819AH1-426A GEN
50/50
4.228
971061AG2-657 GEN
Solar/Wind Harmer
3.981
971063AG2-658 GEN
Solar/Wind Harmer
72.314
238114M24_2
Solar/Wind Harmer
4.771
23751101LEADS_P59
Solar/Wind Helper
1.179
23562501BACKB
Solar/Wind Helper
0.413
235780M24_1
Solar/Wind Harmer
5.89
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.343
WECLTFEXP_WEC->PJM
CLTF
0.165
CPLELTFEXP_CPLE->PJM
CLTF
0.307
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.278
LAGNLTFEXP_LAGN->PJM
CLTF
0.946
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.128
TVALTFEXP_TVA->PJM
CLTF
0.491
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.864
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.85
MECLTFEXP_MEC->PJM
CLTF
0.75
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-113_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-113_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:111.26 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:232.54
MW Contribution:4.23
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.443
237033AB1-150 GEN
Solar/Wind Harmer
3.806
960251AF2-316 GEN
Solar/Wind Harmer
16.887
960201AF2-311 GEN
Solar/Wind Harmer
11.258
971817AH1-426 GEN
50/50
8.456
971819AH1-426A GEN
50/50
4.228
971061AG2-657 GEN
Solar/Wind Harmer
3.981
971063AG2-658 GEN
Solar/Wind Harmer
72.314
238114M24_2
Solar/Wind Harmer
4.771
23751101LEADS_P59
Solar/Wind Helper
1.179
23562501BACKB
Solar/Wind Helper
0.413
235780M24_1
Solar/Wind Harmer
5.89
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.343
WECLTFEXP_WEC->PJM
CLTF
0.165
CPLELTFEXP_CPLE->PJM
CLTF
0.307
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.278
LAGNLTFEXP_LAGN->PJM
CLTF
0.946
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.128
TVALTFEXP_TVA->PJM
CLTF
0.491
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.864
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.85
MECLTFEXP_MEC->PJM
CLTF
0.75
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-069_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-069_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:110.93 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:231.85
MW Contribution:4.23
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.443
237033AB1-150 GEN
Solar/Wind Harmer
3.806
960251AF2-316 GEN
Solar/Wind Harmer
16.887
960201AF2-311 GEN
Solar/Wind Harmer
11.258
971817AH1-426 GEN
50/50
8.456
971819AH1-426A GEN
50/50
4.228
971061AG2-657 GEN
Solar/Wind Harmer
3.981
971063AG2-658 GEN
Solar/Wind Harmer
72.314
238114M24_2
Solar/Wind Harmer
4.771
23751101LEADS_P59
Solar/Wind Helper
1.179
23562501BACKB
Solar/Wind Helper
0.413
235780M24_1
Solar/Wind Harmer
5.89
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.343
WECLTFEXP_WEC->PJM
CLTF
0.165
CPLELTFEXP_CPLE->PJM
CLTF
0.307
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.278
LAGNLTFEXP_LAGN->PJM
CLTF
0.946
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.128
TVALTFEXP_TVA->PJM
CLTF
0.491
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.864
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.85
MECLTFEXP_MEC->PJM
CLTF
0.75
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AEP_P2-2_#16040_05CARBND 138_1_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AEP_P2-2_#16040_05CARBND 138_1_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:105.05 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:219.55
MW Contribution:6.11
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.467
237033AB1-150 GEN
Solar/Wind Harmer
4.129
960251AF2-316 GEN
Solar/Wind Harmer
24.398
960201AF2-311 GEN
Solar/Wind Harmer
16.265
971063AG2-658 GEN
Solar/Wind Harmer
76.475
238114M24_2
Solar/Wind Harmer
5.177
23751101LEADS_P59
Solar/Wind Helper
0.93
235780M24_1
Solar/Wind Harmer
6.391
971817AH1-426 GEN
50/50
12.218
971819AH1-426A GEN
50/50
6.109
NYPJM->LTFIMP_NY
CLTF
0.164
LGEELTFEXP_LGEE->PJM
CLTF
0.234
WECLTFEXP_WEC->PJM
CLTF
0.113
CPLELTFEXP_CPLE->PJM
CLTF
0.217
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.333
LAGNLTFEXP_LAGN->PJM
CLTF
0.657
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.795
TVALTFEXP_TVA->PJM
CLTF
0.342
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.013
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.283
MECLTFEXP_MEC->PJM
CLTF
0.515
SIGELTFEXP_SIGE->PJM
CLTF
0.017

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AEP_P7-1_#10944___SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AEP_P7-1_#10944___SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:102.12 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:213.43
MW Contribution:3.4
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
3.35
960251AF2-316 GEN
Solar/Wind Harmer
13.586
960201AF2-311 GEN
Solar/Wind Harmer
9.057
971817AH1-426 GEN
50/50
6.803
971819AH1-426A GEN
50/50
3.402
971063AG2-658 GEN
Solar/Wind Harmer
70.29
238114M24_2
Solar/Wind Harmer
4.199
23751101LEADS_P59
Solar/Wind Helper
1.036
235780M24_1
Solar/Wind Harmer
5.184
NYPJM->LTFIMP_NY
CLTF
0.203
LGEELTFEXP_LGEE->PJM
CLTF
0.298
WECLTFEXP_WEC->PJM
CLTF
0.141
CPLELTFEXP_CPLE->PJM
CLTF
0.275
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.441
LAGNLTFEXP_LAGN->PJM
CLTF
0.824
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1
TVALTFEXP_TVA->PJM
CLTF
0.429
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.952
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.614
MECLTFEXP_MEC->PJM
CLTF
0.643
SIGELTFEXP_SIGE->PJM
CLTF
0.022

Details for 01BACKFK-01PICKEN 138.0 kV Ckt 1 line l/o AP_P7-1_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BACKFK-01PICKEN 138.0 kV Ckt 1 line
Contingency Name:
AP_P7-1_MP-138-015_SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:101.95 %
Rating:209.0 MVA
Rating Type:B
MVA to Mitigate:213.07
MW Contribution:3.74
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
3.546
960251AF2-316 GEN
Solar/Wind Harmer
14.925
960201AF2-311 GEN
Solar/Wind Harmer
9.95
971063AG2-658 GEN
Solar/Wind Harmer
71.835
238114M24_2
Solar/Wind Harmer
4.445
23751101LEADS_P59
Solar/Wind Helper
1.033
235780M24_1
Solar/Wind Harmer
5.488
971817AH1-426 GEN
50/50
7.474
971819AH1-426A GEN
50/50
3.737
NYPJM->LTFIMP_NY
CLTF
0.213
LGEELTFEXP_LGEE->PJM
CLTF
0.316
WECLTFEXP_WEC->PJM
CLTF
0.151
CPLELTFEXP_CPLE->PJM
CLTF
0.294
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.81
LAGNLTFEXP_LAGN->PJM
CLTF
0.88
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.068
TVALTFEXP_TVA->PJM
CLTF
0.457
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.35
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.72
MECLTFEXP_MEC->PJM
CLTF
0.689
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:175.85 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:186.4
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
274731ELWOOD EC;2P
Adder
0.653
274733ELWOOD EC;3P
Adder
0.653
274735ELWOOD EC;4P
Adder
0.653
274728ELWOOD EC;5P
Adder
0.653
971063AG2-658 GEN
Solar/Wind Harmer
30.081
238114M24_2
Solar/Wind Harmer
3.569
274732ELWOOD EC;7P
Adder
0.653
23751101LEADS_P59
Solar/Wind Helper
0.827
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
235780M24_1
Solar/Wind Harmer
4.406
274729ELWOOD EC;1P
Adder
0.653
274730ELWOOD EC;6P
Adder
0.653
274734ELWOOD EC;8P
Adder
0.653
274736ELWOOD EC;9P
Adder
0.653
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:175.35 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:185.87
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
274731ELWOOD EC;2P
Adder
0.653
274733ELWOOD EC;3P
Adder
0.653
274735ELWOOD EC;4P
Adder
0.653
274728ELWOOD EC;5P
Adder
0.653
971063AG2-658 GEN
Solar/Wind Harmer
30.081
238114M24_2
Solar/Wind Harmer
3.569
274732ELWOOD EC;7P
Adder
0.653
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
4.406
274729ELWOOD EC;1P
Adder
0.653
274730ELWOOD EC;6P
Adder
0.653
274734ELWOOD EC;8P
Adder
0.653
274736ELWOOD EC;9P
Adder
0.653
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:174.78 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:185.27
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
274731ELWOOD EC;2P
Adder
0.653
274733ELWOOD EC;3P
Adder
0.653
274735ELWOOD EC;4P
Adder
0.653
274728ELWOOD EC;5P
Adder
0.653
971063AG2-658 GEN
Solar/Wind Harmer
30.081
238114M24_2
Solar/Wind Harmer
3.569
274732ELWOOD EC;7P
Adder
0.653
23751101LEADS_P59
Solar/Wind Helper
0.827
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
235780M24_1
Solar/Wind Harmer
4.406
274729ELWOOD EC;1P
Adder
0.653
274730ELWOOD EC;6P
Adder
0.653
274734ELWOOD EC;8P
Adder
0.653
274736ELWOOD EC;9P
Adder
0.653
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-023_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-023_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:166.4 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:176.39
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
274732ELWOOD EC;7P
Adder
0.635
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
274729ELWOOD EC;1P
Adder
0.635
274730ELWOOD EC;6P
Adder
0.635
274734ELWOOD EC;8P
Adder
0.635
274736ELWOOD EC;9P
Adder
0.635
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
274731ELWOOD EC;2P
Adder
0.635
274733ELWOOD EC;3P
Adder
0.635
274735ELWOOD EC;4P
Adder
0.635
274728ELWOOD EC;5P
Adder
0.635
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-016_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-016_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:166.37 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:176.35
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
274731ELWOOD EC;2P
Adder
0.635
274733ELWOOD EC;3P
Adder
0.635
274735ELWOOD EC;4P
Adder
0.635
274728ELWOOD EC;5P
Adder
0.635
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
274732ELWOOD EC;7P
Adder
0.635
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
274729ELWOOD EC;1P
Adder
0.635
274730ELWOOD EC;6P
Adder
0.635
274734ELWOOD EC;8P
Adder
0.635
274736ELWOOD EC;9P
Adder
0.635
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-018_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-018_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:166.37 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:176.35
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
274731ELWOOD EC;2P
Adder
0.635
274733ELWOOD EC;3P
Adder
0.635
274735ELWOOD EC;4P
Adder
0.635
274728ELWOOD EC;5P
Adder
0.635
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
274732ELWOOD EC;7P
Adder
0.635
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
274729ELWOOD EC;1P
Adder
0.635
274730ELWOOD EC;6P
Adder
0.635
274734ELWOOD EC;8P
Adder
0.635
274736ELWOOD EC;9P
Adder
0.635
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-015_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:165.71 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:175.66
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
274731ELWOOD EC;2P
Adder
0.635
274733ELWOOD EC;3P
Adder
0.635
274735ELWOOD EC;4P
Adder
0.635
274728ELWOOD EC;5P
Adder
0.635
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
274732ELWOOD EC;7P
Adder
0.635
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
274729ELWOOD EC;1P
Adder
0.635
274730ELWOOD EC;6P
Adder
0.635
274734ELWOOD EC;8P
Adder
0.635
274736ELWOOD EC;9P
Adder
0.635
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-048_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-048_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:149.46 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:158.42
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.348
237033AB1-150 GEN
Solar/Wind Harmer
0.001
960251AF2-316 GEN
Solar/Wind Harmer
11.077
960201AF2-311 GEN
Solar/Wind Harmer
7.367
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
274731ELWOOD EC;2P
Adder
0.653
274733ELWOOD EC;3P
Adder
0.653
274735ELWOOD EC;4P
Adder
0.653
274728ELWOOD EC;5P
Adder
0.653
971063AG2-658 GEN
Solar/Wind Harmer
22.536
274732ELWOOD EC;7P
Adder
0.653
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
0.464
274729ELWOOD EC;1P
Adder
0.653
274730ELWOOD EC;6P
Adder
0.653
274734ELWOOD EC;8P
Adder
0.653
274736ELWOOD EC;9P
Adder
0.653
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-049_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-049_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:148.39 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:157.29
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.348
237033AB1-150 GEN
Solar/Wind Harmer
0.001
960251AF2-316 GEN
Solar/Wind Harmer
11.077
960201AF2-311 GEN
Solar/Wind Harmer
7.367
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
274731ELWOOD EC;2P
Adder
0.653
274733ELWOOD EC;3P
Adder
0.653
274735ELWOOD EC;4P
Adder
0.653
274728ELWOOD EC;5P
Adder
0.653
971063AG2-658 GEN
Solar/Wind Harmer
22.536
274732ELWOOD EC;7P
Adder
0.653
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
0.464
274729ELWOOD EC;1P
Adder
0.653
274730ELWOOD EC;6P
Adder
0.653
274734ELWOOD EC;8P
Adder
0.653
274736ELWOOD EC;9P
Adder
0.653
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-032_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-032_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:148.03 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:156.91
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
274731ELWOOD EC;2P
Adder
0.653
274733ELWOOD EC;3P
Adder
0.653
274735ELWOOD EC;4P
Adder
0.653
274728ELWOOD EC;5P
Adder
0.653
238114M24_2
Solar/Wind Harmer
3.569
274732ELWOOD EC;7P
Adder
0.653
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
4.406
274729ELWOOD EC;1P
Adder
0.653
274730ELWOOD EC;6P
Adder
0.653
274734ELWOOD EC;8P
Adder
0.653
274736ELWOOD EC;9P
Adder
0.653
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-021_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-021_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:144.97 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:153.67
MW Contribution:4.37
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
17.462
960201AF2-311 GEN
Solar/Wind Harmer
11.641
237033AB1-150 GEN
Solar/Wind Harmer
2.478
971817AH1-426 GEN
50/50
8.744
971819AH1-426A GEN
50/50
4.372
274731ELWOOD EC;2P
Adder
0.64
274733ELWOOD EC;3P
Adder
0.64
274735ELWOOD EC;4P
Adder
0.64
274728ELWOOD EC;5P
Adder
0.64
238114M24_2
Solar/Wind Harmer
3.107
274732ELWOOD EC;7P
Adder
0.64
23751101LEADS_P59
Solar/Wind Helper
0.814
235780M24_1
Solar/Wind Harmer
3.835
274729ELWOOD EC;1P
Adder
0.64
274730ELWOOD EC;6P
Adder
0.64
274734ELWOOD EC;8P
Adder
0.64
274736ELWOOD EC;9P
Adder
0.64
NYPJM->LTFIMP_NY
CLTF
0.209
LGEELTFEXP_LGEE->PJM
CLTF
0.311
WECLTFEXP_WEC->PJM
CLTF
0.15
CPLELTFEXP_CPLE->PJM
CLTF
0.267
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.646
LAGNLTFEXP_LAGN->PJM
CLTF
0.846
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.987
TVALTFEXP_TVA->PJM
CLTF
0.438
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.336
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.655
MECLTFEXP_MEC->PJM
CLTF
0.679
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-006_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-006_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:144.89 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:153.59
MW Contribution:4.37
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
17.463
960201AF2-311 GEN
Solar/Wind Harmer
11.642
237033AB1-150 GEN
Solar/Wind Harmer
2.486
971817AH1-426 GEN
50/50
8.745
971819AH1-426A GEN
50/50
4.373
274731ELWOOD EC;2P
Adder
0.64
274733ELWOOD EC;3P
Adder
0.64
274735ELWOOD EC;4P
Adder
0.64
274728ELWOOD EC;5P
Adder
0.64
238114M24_2
Solar/Wind Harmer
3.116
274732ELWOOD EC;7P
Adder
0.64
23751101LEADS_P59
Solar/Wind Helper
0.814
235780M24_1
Solar/Wind Harmer
3.847
274729ELWOOD EC;1P
Adder
0.64
274730ELWOOD EC;6P
Adder
0.64
274734ELWOOD EC;8P
Adder
0.64
274736ELWOOD EC;9P
Adder
0.64
NYPJM->LTFIMP_NY
CLTF
0.209
LGEELTFEXP_LGEE->PJM
CLTF
0.311
WECLTFEXP_WEC->PJM
CLTF
0.15
CPLELTFEXP_CPLE->PJM
CLTF
0.267
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.649
LAGNLTFEXP_LAGN->PJM
CLTF
0.846
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.988
TVALTFEXP_TVA->PJM
CLTF
0.438
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.339
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.656
MECLTFEXP_MEC->PJM
CLTF
0.679
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:125.95 %
Rating:85.0 MVA
Rating Type:A
MVA to Mitigate:107.06
MW Contribution:3.32
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.233
960251AF2-316 GEN
Solar/Wind Harmer
8.491
960201AF2-311 GEN
Solar/Wind Harmer
5.647
237033AB1-150 GEN
Solar/Wind Harmer
0.001
971817AH1-426 GEN
50/50
6.632
971819AH1-426A GEN
50/50
3.316
274731ELWOOD EC;2P
Adder
0.48
274733ELWOOD EC;3P
Adder
0.48
274735ELWOOD EC;4P
Adder
0.48
274728ELWOOD EC;5P
Adder
0.48
971063AG2-658 GEN
Solar/Wind Harmer
6.849
274732ELWOOD EC;7P
Adder
0.48
235780M24_1
Solar/Wind Harmer
0.302
274729ELWOOD EC;1P
Adder
0.48
274730ELWOOD EC;6P
Adder
0.48
274734ELWOOD EC;8P
Adder
0.48
274736ELWOOD EC;9P
Adder
0.48
NYPJM->LTFIMP_NY
CLTF
0.156
LGEELTFEXP_LGEE->PJM
CLTF
0.233
WECLTFEXP_WEC->PJM
CLTF
0.113
CPLELTFEXP_CPLE->PJM
CLTF
0.201
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.239
LAGNLTFEXP_LAGN->PJM
CLTF
0.635
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.743
TVALTFEXP_TVA->PJM
CLTF
0.329
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.002
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.243
MECLTFEXP_MEC->PJM
CLTF
0.509
SIGELTFEXP_SIGE->PJM
CLTF
0.017

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P7-1_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P7-1_MP-138-015_SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:123.97 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:131.41
MW Contribution:3.73
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
14.879
960201AF2-311 GEN
Solar/Wind Harmer
9.919
237033AB1-150 GEN
Solar/Wind Harmer
2.088
971817AH1-426 GEN
50/50
7.451
971819AH1-426A GEN
50/50
3.726
238114M24_2
Solar/Wind Harmer
2.618
971063AG2-658 GEN
Solar/Wind Harmer
11.007
235780M24_1
Solar/Wind Harmer
3.232
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.271
WECLTFEXP_WEC->PJM
CLTF
0.13
CPLELTFEXP_CPLE->PJM
CLTF
0.244
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.94
LAGNLTFEXP_LAGN->PJM
CLTF
0.745
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.892
TVALTFEXP_TVA->PJM
CLTF
0.387
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.579
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.457
MECLTFEXP_MEC->PJM
CLTF
0.589
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AEP_P7-1_#10944___SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AEP_P7-1_#10944___SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:120.58 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:127.82
MW Contribution:3.33
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
13.284
960201AF2-311 GEN
Solar/Wind Harmer
8.856
237033AB1-150 GEN
Solar/Wind Harmer
1.855
971817AH1-426 GEN
50/50
6.652
971819AH1-426A GEN
50/50
3.326
238114M24_2
Solar/Wind Harmer
2.325
971063AG2-658 GEN
Solar/Wind Harmer
9.171
235780M24_1
Solar/Wind Harmer
2.871
NYPJM->LTFIMP_NY
CLTF
0.163
LGEELTFEXP_LGEE->PJM
CLTF
0.245
WECLTFEXP_WEC->PJM
CLTF
0.116
CPLELTFEXP_CPLE->PJM
CLTF
0.215
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.429
LAGNLTFEXP_LAGN->PJM
CLTF
0.666
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.791
TVALTFEXP_TVA->PJM
CLTF
0.346
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.083
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.306
MECLTFEXP_MEC->PJM
CLTF
0.527
SIGELTFEXP_SIGE->PJM
CLTF
0.018

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-024_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-024_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:125.21 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:266.7
MW Contribution:5.09
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.029
960251AF2-316 GEN
Solar/Wind Harmer
20.327
960201AF2-311 GEN
Solar/Wind Harmer
13.551
971063AG2-658 GEN
Solar/Wind Harmer
85.57
238114M24_2
Solar/Wind Harmer
6.305
23751101LEADS_P59
Solar/Wind Helper
1.086
235780M24_1
Solar/Wind Harmer
7.783
971817AH1-426 GEN
50/50
10.179
971819AH1-426A GEN
50/50
5.09
971061AG2-657 GEN
Solar/Wind Harmer
4.628
270132AB1-180 C
Adder
0.054
NYPJM->LTFIMP_NY
CLTF
0.239
LGEELTFEXP_LGEE->PJM
CLTF
0.351
WECLTFEXP_WEC->PJM
CLTF
0.168
CPLELTFEXP_CPLE->PJM
CLTF
0.346
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.524
LAGNLTFEXP_LAGN->PJM
CLTF
0.996
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.241
TVALTFEXP_TVA->PJM
CLTF
0.519
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.919
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.944
MECLTFEXP_MEC->PJM
CLTF
0.768
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-084T_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-084T_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:125.2 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:266.67
MW Contribution:5.09
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.029
960251AF2-316 GEN
Solar/Wind Harmer
20.327
960201AF2-311 GEN
Solar/Wind Harmer
13.551
971063AG2-658 GEN
Solar/Wind Harmer
85.57
238114M24_2
Solar/Wind Harmer
6.305
23751101LEADS_P59
Solar/Wind Helper
1.086
235780M24_1
Solar/Wind Harmer
7.783
971817AH1-426 GEN
50/50
10.179
971819AH1-426A GEN
50/50
5.09
971061AG2-657 GEN
Solar/Wind Harmer
4.628
270132AB1-180 C
Adder
0.054
NYPJM->LTFIMP_NY
CLTF
0.239
LGEELTFEXP_LGEE->PJM
CLTF
0.351
WECLTFEXP_WEC->PJM
CLTF
0.168
CPLELTFEXP_CPLE->PJM
CLTF
0.346
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.524
LAGNLTFEXP_LAGN->PJM
CLTF
0.996
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.241
TVALTFEXP_TVA->PJM
CLTF
0.519
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.919
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.944
MECLTFEXP_MEC->PJM
CLTF
0.768
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-083_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-083_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:125.19 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:266.65
MW Contribution:5.09
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.029
960251AF2-316 GEN
Solar/Wind Harmer
20.327
960201AF2-311 GEN
Solar/Wind Harmer
13.551
971817AH1-426 GEN
50/50
10.179
971819AH1-426A GEN
50/50
5.09
971061AG2-657 GEN
Solar/Wind Harmer
4.628
270132AB1-180 C
Adder
0.054
971063AG2-658 GEN
Solar/Wind Harmer
85.57
238114M24_2
Solar/Wind Harmer
6.305
23751101LEADS_P59
Solar/Wind Helper
1.086
235780M24_1
Solar/Wind Harmer
7.783
NYPJM->LTFIMP_NY
CLTF
0.239
LGEELTFEXP_LGEE->PJM
CLTF
0.351
WECLTFEXP_WEC->PJM
CLTF
0.168
CPLELTFEXP_CPLE->PJM
CLTF
0.346
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.524
LAGNLTFEXP_LAGN->PJM
CLTF
0.996
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.241
TVALTFEXP_TVA->PJM
CLTF
0.519
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.919
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.944
MECLTFEXP_MEC->PJM
CLTF
0.768
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-082_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-082_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:124.52 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:265.22
MW Contribution:5.09
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.57
237033AB1-150 GEN
Solar/Wind Harmer
5.025
960251AF2-316 GEN
Solar/Wind Harmer
20.313
960201AF2-311 GEN
Solar/Wind Harmer
13.542
971817AH1-426 GEN
50/50
10.172
971819AH1-426A GEN
50/50
5.086
971061AG2-657 GEN
Solar/Wind Harmer
4.625
270132AB1-180 C
Adder
0.054
971063AG2-658 GEN
Solar/Wind Harmer
85.51
238114M24_2
Solar/Wind Harmer
6.3
23751101LEADS_P59
Solar/Wind Helper
1.087
235780M24_1
Solar/Wind Harmer
7.778
NYPJM->LTFIMP_NY
CLTF
0.239
LGEELTFEXP_LGEE->PJM
CLTF
0.351
WECLTFEXP_WEC->PJM
CLTF
0.168
CPLELTFEXP_CPLE->PJM
CLTF
0.346
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.52
LAGNLTFEXP_LAGN->PJM
CLTF
0.995
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.24
TVALTFEXP_TVA->PJM
CLTF
0.519
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.916
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.943
MECLTFEXP_MEC->PJM
CLTF
0.767
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-088_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-088_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:117.65 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:250.59
MW Contribution:4.46
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
8.927
971819AH1-426A GEN
50/50
4.463
971061AG2-657 GEN
Solar/Wind Harmer
4.188
24446705SUMMERVL
50/50
0.46
237033AB1-150 GEN
Solar/Wind Harmer
3.942
960251AF2-316 GEN
Solar/Wind Harmer
17.826
960201AF2-311 GEN
Solar/Wind Harmer
11.884
971063AG2-658 GEN
Solar/Wind Harmer
73.167
238114M24_2
Solar/Wind Harmer
4.942
23751101LEADS_P59
Solar/Wind Helper
1.206
23562501BACKB
Solar/Wind Helper
0.424
235780M24_1
Solar/Wind Harmer
6.101
NYPJM->LTFIMP_NY
CLTF
0.244
LGEELTFEXP_LGEE->PJM
CLTF
0.359
WECLTFEXP_WEC->PJM
CLTF
0.173
CPLELTFEXP_CPLE->PJM
CLTF
0.322
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.58
LAGNLTFEXP_LAGN->PJM
CLTF
0.992
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.182
TVALTFEXP_TVA->PJM
CLTF
0.515
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.148
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.938
MECLTFEXP_MEC->PJM
CLTF
0.786
SIGELTFEXP_SIGE->PJM
CLTF
0.027

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-111_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-111_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:117.62 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:250.53
MW Contribution:4.46
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.46
237033AB1-150 GEN
Solar/Wind Harmer
3.942
960251AF2-316 GEN
Solar/Wind Harmer
17.826
960201AF2-311 GEN
Solar/Wind Harmer
11.884
971817AH1-426 GEN
50/50
8.927
971819AH1-426A GEN
50/50
4.463
971061AG2-657 GEN
Solar/Wind Harmer
4.188
971063AG2-658 GEN
Solar/Wind Harmer
73.167
238114M24_2
Solar/Wind Harmer
4.942
23751101LEADS_P59
Solar/Wind Helper
1.206
23562501BACKB
Solar/Wind Helper
0.424
235780M24_1
Solar/Wind Harmer
6.101
NYPJM->LTFIMP_NY
CLTF
0.244
LGEELTFEXP_LGEE->PJM
CLTF
0.359
WECLTFEXP_WEC->PJM
CLTF
0.173
CPLELTFEXP_CPLE->PJM
CLTF
0.322
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.58
LAGNLTFEXP_LAGN->PJM
CLTF
0.992
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.182
TVALTFEXP_TVA->PJM
CLTF
0.515
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.148
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.938
MECLTFEXP_MEC->PJM
CLTF
0.786
SIGELTFEXP_SIGE->PJM
CLTF
0.027

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-070_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-070_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:111.81 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:238.15
MW Contribution:4.23
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.443
237033AB1-150 GEN
Solar/Wind Harmer
3.806
960251AF2-316 GEN
Solar/Wind Harmer
16.887
960201AF2-311 GEN
Solar/Wind Harmer
11.258
971817AH1-426 GEN
50/50
8.456
971819AH1-426A GEN
50/50
4.228
971061AG2-657 GEN
Solar/Wind Harmer
3.981
971063AG2-658 GEN
Solar/Wind Harmer
72.314
238114M24_2
Solar/Wind Harmer
4.771
23751101LEADS_P59
Solar/Wind Helper
1.179
23562501BACKB
Solar/Wind Helper
0.413
235780M24_1
Solar/Wind Harmer
5.89
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.343
WECLTFEXP_WEC->PJM
CLTF
0.165
CPLELTFEXP_CPLE->PJM
CLTF
0.307
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.278
LAGNLTFEXP_LAGN->PJM
CLTF
0.946
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.128
TVALTFEXP_TVA->PJM
CLTF
0.491
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.864
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.85
MECLTFEXP_MEC->PJM
CLTF
0.75
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-113_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-113_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:111.0 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:236.44
MW Contribution:4.23
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.443
237033AB1-150 GEN
Solar/Wind Harmer
3.806
960251AF2-316 GEN
Solar/Wind Harmer
16.887
960201AF2-311 GEN
Solar/Wind Harmer
11.258
971817AH1-426 GEN
50/50
8.456
971819AH1-426A GEN
50/50
4.228
971061AG2-657 GEN
Solar/Wind Harmer
3.981
971063AG2-658 GEN
Solar/Wind Harmer
72.314
238114M24_2
Solar/Wind Harmer
4.771
23751101LEADS_P59
Solar/Wind Helper
1.179
23562501BACKB
Solar/Wind Helper
0.413
235780M24_1
Solar/Wind Harmer
5.89
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.343
WECLTFEXP_WEC->PJM
CLTF
0.165
CPLELTFEXP_CPLE->PJM
CLTF
0.307
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.278
LAGNLTFEXP_LAGN->PJM
CLTF
0.946
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.128
TVALTFEXP_TVA->PJM
CLTF
0.491
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.864
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.85
MECLTFEXP_MEC->PJM
CLTF
0.75
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-069_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-069_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:110.68 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:235.75
MW Contribution:4.23
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.443
237033AB1-150 GEN
Solar/Wind Harmer
3.806
960251AF2-316 GEN
Solar/Wind Harmer
16.887
960201AF2-311 GEN
Solar/Wind Harmer
11.258
971817AH1-426 GEN
50/50
8.456
971819AH1-426A GEN
50/50
4.228
971061AG2-657 GEN
Solar/Wind Harmer
3.981
971063AG2-658 GEN
Solar/Wind Harmer
72.314
238114M24_2
Solar/Wind Harmer
4.771
23751101LEADS_P59
Solar/Wind Helper
1.179
23562501BACKB
Solar/Wind Helper
0.413
235780M24_1
Solar/Wind Harmer
5.89
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.343
WECLTFEXP_WEC->PJM
CLTF
0.165
CPLELTFEXP_CPLE->PJM
CLTF
0.307
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.278
LAGNLTFEXP_LAGN->PJM
CLTF
0.946
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.128
TVALTFEXP_TVA->PJM
CLTF
0.491
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.864
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.85
MECLTFEXP_MEC->PJM
CLTF
0.75
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AEP_P2-2_#16040_05CARBND 138_1_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AEP_P2-2_#16040_05CARBND 138_1_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:104.93 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:223.5
MW Contribution:6.11
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.467
237033AB1-150 GEN
Solar/Wind Harmer
4.129
960251AF2-316 GEN
Solar/Wind Harmer
24.398
960201AF2-311 GEN
Solar/Wind Harmer
16.265
971817AH1-426 GEN
50/50
12.218
971819AH1-426A GEN
50/50
6.109
971063AG2-658 GEN
Solar/Wind Harmer
76.475
238114M24_2
Solar/Wind Harmer
5.177
23751101LEADS_P59
Solar/Wind Helper
0.93
235780M24_1
Solar/Wind Harmer
6.391
NYPJM->LTFIMP_NY
CLTF
0.164
LGEELTFEXP_LGEE->PJM
CLTF
0.234
WECLTFEXP_WEC->PJM
CLTF
0.113
CPLELTFEXP_CPLE->PJM
CLTF
0.217
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.333
LAGNLTFEXP_LAGN->PJM
CLTF
0.657
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.795
TVALTFEXP_TVA->PJM
CLTF
0.342
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.013
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.283
MECLTFEXP_MEC->PJM
CLTF
0.515
SIGELTFEXP_SIGE->PJM
CLTF
0.017

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AEP_P7-1_#10944___SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AEP_P7-1_#10944___SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:102.05 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:217.37
MW Contribution:3.4
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
3.35
960251AF2-316 GEN
Solar/Wind Harmer
13.586
960201AF2-311 GEN
Solar/Wind Harmer
9.057
971817AH1-426 GEN
50/50
6.803
971819AH1-426A GEN
50/50
3.402
971063AG2-658 GEN
Solar/Wind Harmer
70.29
238114M24_2
Solar/Wind Harmer
4.199
23751101LEADS_P59
Solar/Wind Helper
1.036
235780M24_1
Solar/Wind Harmer
5.184
NYPJM->LTFIMP_NY
CLTF
0.203
LGEELTFEXP_LGEE->PJM
CLTF
0.298
WECLTFEXP_WEC->PJM
CLTF
0.141
CPLELTFEXP_CPLE->PJM
CLTF
0.275
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.441
LAGNLTFEXP_LAGN->PJM
CLTF
0.824
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1
TVALTFEXP_TVA->PJM
CLTF
0.429
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.952
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.614
MECLTFEXP_MEC->PJM
CLTF
0.643
SIGELTFEXP_SIGE->PJM
CLTF
0.022

Details for 01COWEN-01BACKFK 138.0 kV Ckt 1 line l/o AP_P7-1_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01COWEN-01BACKFK 138.0 kV Ckt 1 line
Contingency Name:
AP_P7-1_MP-138-015_SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:101.88 %
Rating:213.0 MVA
Rating Type:B
MVA to Mitigate:217.01
MW Contribution:3.74
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
3.546
960251AF2-316 GEN
Solar/Wind Harmer
14.925
960201AF2-311 GEN
Solar/Wind Harmer
9.95
971817AH1-426 GEN
50/50
7.474
971819AH1-426A GEN
50/50
3.737
971063AG2-658 GEN
Solar/Wind Harmer
71.835
238114M24_2
Solar/Wind Harmer
4.445
23751101LEADS_P59
Solar/Wind Helper
1.033
235780M24_1
Solar/Wind Harmer
5.488
NYPJM->LTFIMP_NY
CLTF
0.213
LGEELTFEXP_LGEE->PJM
CLTF
0.316
WECLTFEXP_WEC->PJM
CLTF
0.151
CPLELTFEXP_CPLE->PJM
CLTF
0.294
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.81
LAGNLTFEXP_LAGN->PJM
CLTF
0.88
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.068
TVALTFEXP_TVA->PJM
CLTF
0.457
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.35
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.72
MECLTFEXP_MEC->PJM
CLTF
0.689
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01ENONTP-01POWELM 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-017A_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01ENONTP-01POWELM 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-017A_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:103.46 %
Rating:244.0 MVA
Rating Type:B
MVA to Mitigate:252.44
MW Contribution:13.47
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
53.79
960201AF2-311 GEN
Solar/Wind Harmer
35.86
23751101LEADS_P59
Solar/Wind Helper
0.766
971817AH1-426 GEN
50/50
26.937
971819AH1-426A GEN
50/50
13.468
971061AG2-657 GEN
Solar/Wind Harmer
9.048
NYPJM->LTFIMP_NY
CLTF
0.225
LGEELTFEXP_LGEE->PJM
CLTF
0.349
WECLTFEXP_WEC->PJM
CLTF
0.165
CPLELTFEXP_CPLE->PJM
CLTF
0.352
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.457
LAGNLTFEXP_LAGN->PJM
CLTF
0.986
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.244
TVALTFEXP_TVA->PJM
CLTF
0.514
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.8
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.926
MECLTFEXP_MEC->PJM
CLTF
0.757
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01ENONTP-01POWELM 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-169T_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01ENONTP-01POWELM 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-169T_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.44 %
Rating:244.0 MVA
Rating Type:B
MVA to Mitigate:252.38
MW Contribution:13.47
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
53.79
960201AF2-311 GEN
Solar/Wind Harmer
35.86
971817AH1-426 GEN
50/50
26.937
971819AH1-426A GEN
50/50
13.468
971061AG2-657 GEN
Solar/Wind Harmer
9.048
23751101LEADS_P59
Solar/Wind Helper
0.766
NYPJM->LTFIMP_NY
CLTF
0.225
LGEELTFEXP_LGEE->PJM
CLTF
0.349
WECLTFEXP_WEC->PJM
CLTF
0.165
CPLELTFEXP_CPLE->PJM
CLTF
0.352
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.457
LAGNLTFEXP_LAGN->PJM
CLTF
0.986
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.244
TVALTFEXP_TVA->PJM
CLTF
0.514
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.8
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.926
MECLTFEXP_MEC->PJM
CLTF
0.757
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01ENONTP-01POWELM 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-168T_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01ENONTP-01POWELM 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-168T_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.42 %
Rating:244.0 MVA
Rating Type:B
MVA to Mitigate:252.35
MW Contribution:13.47
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
53.79
960201AF2-311 GEN
Solar/Wind Harmer
35.86
971817AH1-426 GEN
50/50
26.937
971819AH1-426A GEN
50/50
13.468
971061AG2-657 GEN
Solar/Wind Harmer
9.048
23751101LEADS_P59
Solar/Wind Helper
0.766
NYPJM->LTFIMP_NY
CLTF
0.225
LGEELTFEXP_LGEE->PJM
CLTF
0.349
WECLTFEXP_WEC->PJM
CLTF
0.165
CPLELTFEXP_CPLE->PJM
CLTF
0.352
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.457
LAGNLTFEXP_LAGN->PJM
CLTF
0.986
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.244
TVALTFEXP_TVA->PJM
CLTF
0.514
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.8
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.926
MECLTFEXP_MEC->PJM
CLTF
0.757
SIGELTFEXP_SIGE->PJM
CLTF
0.026

Details for 01HEATER-01FRNCHC 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01HEATER-01FRNCHC 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:107.17 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:137.18
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971063AG2-658 GEN
Solar/Wind Harmer
26.038
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01HEATER-01FRNCHC 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01HEATER-01FRNCHC 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:106.8 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:136.7
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
971063AG2-658 GEN
Solar/Wind Harmer
26.038
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01HEATER-01FRNCHC 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01HEATER-01FRNCHC 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:106.41 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:136.2
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971817AH1-426 GEN
50/50
7.49
971063AG2-658 GEN
Solar/Wind Harmer
26.038
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
971819AH1-426A GEN
50/50
3.745
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01NETTIE-01CRUPRN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-024_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01NETTIE-01CRUPRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-024_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:104.04 %
Rating:192.0 MVA
Rating Type:B
MVA to Mitigate:199.76
MW Contribution:4.78
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.071
960251AF2-316 GEN
Solar/Wind Harmer
19.082
960201AF2-311 GEN
Solar/Wind Harmer
12.721
971817AH1-426 GEN
50/50
9.556
971819AH1-426A GEN
50/50
4.778
971061AG2-657 GEN
Solar/Wind Harmer
4.421
270132AB1-180 C
Adder
0.054
238114M24_2
Solar/Wind Harmer
6.357
23751101LEADS_P59
Solar/Wind Helper
1.058
235780M24_1
Solar/Wind Harmer
7.848
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.342
WECLTFEXP_WEC->PJM
CLTF
0.163
CPLELTFEXP_CPLE->PJM
CLTF
0.338
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.36
LAGNLTFEXP_LAGN->PJM
CLTF
0.971
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.213
TVALTFEXP_TVA->PJM
CLTF
0.506
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.762
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.896
MECLTFEXP_MEC->PJM
CLTF
0.748
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01NETTIE-01CRUPRN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-084T_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01NETTIE-01CRUPRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-084T_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.03 %
Rating:192.0 MVA
Rating Type:B
MVA to Mitigate:199.73
MW Contribution:4.78
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.071
960251AF2-316 GEN
Solar/Wind Harmer
19.082
960201AF2-311 GEN
Solar/Wind Harmer
12.721
238114M24_2
Solar/Wind Harmer
6.357
23751101LEADS_P59
Solar/Wind Helper
1.058
235780M24_1
Solar/Wind Harmer
7.848
971817AH1-426 GEN
50/50
9.556
971819AH1-426A GEN
50/50
4.778
971061AG2-657 GEN
Solar/Wind Harmer
4.421
270132AB1-180 C
Adder
0.054
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.342
WECLTFEXP_WEC->PJM
CLTF
0.163
CPLELTFEXP_CPLE->PJM
CLTF
0.338
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.36
LAGNLTFEXP_LAGN->PJM
CLTF
0.971
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.213
TVALTFEXP_TVA->PJM
CLTF
0.506
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.762
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.896
MECLTFEXP_MEC->PJM
CLTF
0.748
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01NETTIE-01CRUPRN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-083_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01NETTIE-01CRUPRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-083_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.02 %
Rating:192.0 MVA
Rating Type:B
MVA to Mitigate:199.71
MW Contribution:4.78
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.071
960251AF2-316 GEN
Solar/Wind Harmer
19.082
960201AF2-311 GEN
Solar/Wind Harmer
12.721
238114M24_2
Solar/Wind Harmer
6.357
23751101LEADS_P59
Solar/Wind Helper
1.058
235780M24_1
Solar/Wind Harmer
7.848
971817AH1-426 GEN
50/50
9.556
971819AH1-426A GEN
50/50
4.778
971061AG2-657 GEN
Solar/Wind Harmer
4.421
270132AB1-180 C
Adder
0.054
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.342
WECLTFEXP_WEC->PJM
CLTF
0.163
CPLELTFEXP_CPLE->PJM
CLTF
0.338
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.36
LAGNLTFEXP_LAGN->PJM
CLTF
0.971
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.213
TVALTFEXP_TVA->PJM
CLTF
0.506
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.762
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.896
MECLTFEXP_MEC->PJM
CLTF
0.748
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01NETTIE-01CRUPRN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-082_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01NETTIE-01CRUPRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-082_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.35 %
Rating:192.0 MVA
Rating Type:B
MVA to Mitigate:198.43
MW Contribution:4.77
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.571
237033AB1-150 GEN
Solar/Wind Harmer
5.067
960251AF2-316 GEN
Solar/Wind Harmer
19.068
960201AF2-311 GEN
Solar/Wind Harmer
12.712
971817AH1-426 GEN
50/50
9.549
971819AH1-426A GEN
50/50
4.774
971061AG2-657 GEN
Solar/Wind Harmer
4.418
270132AB1-180 C
Adder
0.054
238114M24_2
Solar/Wind Harmer
6.353
23751101LEADS_P59
Solar/Wind Helper
1.06
235780M24_1
Solar/Wind Harmer
7.843
NYPJM->LTFIMP_NY
CLTF
0.233
LGEELTFEXP_LGEE->PJM
CLTF
0.342
WECLTFEXP_WEC->PJM
CLTF
0.163
CPLELTFEXP_CPLE->PJM
CLTF
0.338
CBM West 2LTFEXP_CBM-W2->PJM
CBM
6.355
LAGNLTFEXP_LAGN->PJM
CLTF
0.971
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.213
TVALTFEXP_TVA->PJM
CLTF
0.506
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.759
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.895
MECLTFEXP_MEC->PJM
CLTF
0.747
SIGELTFEXP_SIGE->PJM
CLTF
0.025

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:146.16 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:187.09
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
971063AG2-658 GEN
Solar/Wind Harmer
30.081
238114M24_2
Solar/Wind Harmer
3.569
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
4.406
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:145.74 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:186.55
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
971063AG2-658 GEN
Solar/Wind Harmer
30.081
238114M24_2
Solar/Wind Harmer
3.569
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
4.406
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:145.27 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:185.95
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
971063AG2-658 GEN
Solar/Wind Harmer
30.081
238114M24_2
Solar/Wind Harmer
3.569
23751101LEADS_P59
Solar/Wind Helper
0.827
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
235780M24_1
Solar/Wind Harmer
4.406
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-023_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-023_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:138.46 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:177.23
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-016_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-016_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:138.43 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:177.19
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-018_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-018_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:138.43 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:177.19
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-015_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:137.91 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:176.52
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-048_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-048_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:124.32 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:159.12
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.348
237033AB1-150 GEN
Solar/Wind Harmer
0.001
960251AF2-316 GEN
Solar/Wind Harmer
11.077
960201AF2-311 GEN
Solar/Wind Harmer
7.367
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
971063AG2-658 GEN
Solar/Wind Harmer
22.536
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
0.464
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-049_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-049_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:123.42 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:157.97
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.348
237033AB1-150 GEN
Solar/Wind Harmer
0.001
960251AF2-316 GEN
Solar/Wind Harmer
11.077
960201AF2-311 GEN
Solar/Wind Harmer
7.367
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
971063AG2-658 GEN
Solar/Wind Harmer
22.536
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
0.464
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-032_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-032_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:123.13 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:157.61
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
238114M24_2
Solar/Wind Harmer
3.569
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
4.406
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-021_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-021_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:120.63 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:154.41
MW Contribution:4.37
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
17.462
960201AF2-311 GEN
Solar/Wind Harmer
11.641
237033AB1-150 GEN
Solar/Wind Harmer
2.478
971817AH1-426 GEN
50/50
8.744
971819AH1-426A GEN
50/50
4.372
238114M24_2
Solar/Wind Harmer
3.107
23751101LEADS_P59
Solar/Wind Helper
0.814
235780M24_1
Solar/Wind Harmer
3.835
NYPJM->LTFIMP_NY
CLTF
0.209
LGEELTFEXP_LGEE->PJM
CLTF
0.311
WECLTFEXP_WEC->PJM
CLTF
0.15
CPLELTFEXP_CPLE->PJM
CLTF
0.267
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.646
LAGNLTFEXP_LAGN->PJM
CLTF
0.846
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.987
TVALTFEXP_TVA->PJM
CLTF
0.438
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.336
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.655
MECLTFEXP_MEC->PJM
CLTF
0.679
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-006_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-006_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:120.57 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:154.33
MW Contribution:4.37
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
17.463
960201AF2-311 GEN
Solar/Wind Harmer
11.642
237033AB1-150 GEN
Solar/Wind Harmer
2.486
971817AH1-426 GEN
50/50
8.745
971819AH1-426A GEN
50/50
4.373
238114M24_2
Solar/Wind Harmer
3.116
23751101LEADS_P59
Solar/Wind Helper
0.814
235780M24_1
Solar/Wind Harmer
3.847
NYPJM->LTFIMP_NY
CLTF
0.209
LGEELTFEXP_LGEE->PJM
CLTF
0.311
WECLTFEXP_WEC->PJM
CLTF
0.15
CPLELTFEXP_CPLE->PJM
CLTF
0.267
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.649
LAGNLTFEXP_LAGN->PJM
CLTF
0.846
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.988
TVALTFEXP_TVA->PJM
CLTF
0.438
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.339
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.656
MECLTFEXP_MEC->PJM
CLTF
0.679
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P7-1_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P7-1_MP-138-015_SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:107.7 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:137.85
MW Contribution:3.73
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
14.879
960201AF2-311 GEN
Solar/Wind Harmer
9.919
237033AB1-150 GEN
Solar/Wind Harmer
2.088
238114M24_2
Solar/Wind Harmer
2.618
971063AG2-658 GEN
Solar/Wind Harmer
11.007
235780M24_1
Solar/Wind Harmer
3.232
971817AH1-426 GEN
50/50
7.451
971819AH1-426A GEN
50/50
3.726
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.271
WECLTFEXP_WEC->PJM
CLTF
0.13
CPLELTFEXP_CPLE->PJM
CLTF
0.244
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.94
LAGNLTFEXP_LAGN->PJM
CLTF
0.745
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.892
TVALTFEXP_TVA->PJM
CLTF
0.387
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.579
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.457
MECLTFEXP_MEC->PJM
CLTF
0.589
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AEP_P7-1_#10944___SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AEP_P7-1_#10944___SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:104.9 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:134.27
MW Contribution:3.33
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
13.284
960201AF2-311 GEN
Solar/Wind Harmer
8.856
237033AB1-150 GEN
Solar/Wind Harmer
1.855
971817AH1-426 GEN
50/50
6.652
971819AH1-426A GEN
50/50
3.326
238114M24_2
Solar/Wind Harmer
2.325
971063AG2-658 GEN
Solar/Wind Harmer
9.171
235780M24_1
Solar/Wind Harmer
2.871
NYPJM->LTFIMP_NY
CLTF
0.163
LGEELTFEXP_LGEE->PJM
CLTF
0.245
WECLTFEXP_WEC->PJM
CLTF
0.116
CPLELTFEXP_CPLE->PJM
CLTF
0.215
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.429
LAGNLTFEXP_LAGN->PJM
CLTF
0.666
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.791
TVALTFEXP_TVA->PJM
CLTF
0.346
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.083
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.306
MECLTFEXP_MEC->PJM
CLTF
0.527
SIGELTFEXP_SIGE->PJM
CLTF
0.018

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:102.06 %
Rating:107.0 MVA
Rating Type:A
MVA to Mitigate:109.21
MW Contribution:3.32
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.233
960251AF2-316 GEN
Solar/Wind Harmer
8.491
960201AF2-311 GEN
Solar/Wind Harmer
5.647
237033AB1-150 GEN
Solar/Wind Harmer
0.001
971817AH1-426 GEN
50/50
6.632
971819AH1-426A GEN
50/50
3.316
971063AG2-658 GEN
Solar/Wind Harmer
6.849
235780M24_1
Solar/Wind Harmer
0.302
NYPJM->LTFIMP_NY
CLTF
0.156
LGEELTFEXP_LGEE->PJM
CLTF
0.233
WECLTFEXP_WEC->PJM
CLTF
0.113
CPLELTFEXP_CPLE->PJM
CLTF
0.201
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.239
LAGNLTFEXP_LAGN->PJM
CLTF
0.635
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.743
TVALTFEXP_TVA->PJM
CLTF
0.329
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.002
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.243
MECLTFEXP_MEC->PJM
CLTF
0.509
SIGELTFEXP_SIGE->PJM
CLTF
0.017

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:138.6 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:146.91
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
971063AG2-658 GEN
Solar/Wind Harmer
26.038
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:138.12 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:146.4
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
971063AG2-658 GEN
Solar/Wind Harmer
26.038
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:137.63 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:145.88
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971063AG2-658 GEN
Solar/Wind Harmer
26.038
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-023_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-023_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:129.28 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:137.03
MW Contribution:3.66
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.407
960251AF2-316 GEN
Solar/Wind Harmer
14.609
960201AF2-311 GEN
Solar/Wind Harmer
9.74
971817AH1-426 GEN
50/50
7.316
971819AH1-426A GEN
50/50
3.658
971063AG2-658 GEN
Solar/Wind Harmer
25.438
238114M24_2
Solar/Wind Harmer
3.018
23751101LEADS_P59
Solar/Wind Helper
0.604
235780M24_1
Solar/Wind Harmer
3.726
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.266
WECLTFEXP_WEC->PJM
CLTF
0.129
CPLELTFEXP_CPLE->PJM
CLTF
0.233
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.857
LAGNLTFEXP_LAGN->PJM
CLTF
0.73
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.86
TVALTFEXP_TVA->PJM
CLTF
0.378
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.563
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.427
MECLTFEXP_MEC->PJM
CLTF
0.582
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-016_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-016_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:129.25 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:137.0
MW Contribution:3.66
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.407
960251AF2-316 GEN
Solar/Wind Harmer
14.609
960201AF2-311 GEN
Solar/Wind Harmer
9.74
971817AH1-426 GEN
50/50
7.316
971819AH1-426A GEN
50/50
3.658
971063AG2-658 GEN
Solar/Wind Harmer
25.438
238114M24_2
Solar/Wind Harmer
3.018
23751101LEADS_P59
Solar/Wind Helper
0.604
235780M24_1
Solar/Wind Harmer
3.726
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.266
WECLTFEXP_WEC->PJM
CLTF
0.129
CPLELTFEXP_CPLE->PJM
CLTF
0.233
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.857
LAGNLTFEXP_LAGN->PJM
CLTF
0.73
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.86
TVALTFEXP_TVA->PJM
CLTF
0.378
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.563
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.427
MECLTFEXP_MEC->PJM
CLTF
0.582
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-018_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-018_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:129.25 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:137.0
MW Contribution:3.66
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.407
960251AF2-316 GEN
Solar/Wind Harmer
14.609
960201AF2-311 GEN
Solar/Wind Harmer
9.74
971817AH1-426 GEN
50/50
7.316
971819AH1-426A GEN
50/50
3.658
971063AG2-658 GEN
Solar/Wind Harmer
25.438
238114M24_2
Solar/Wind Harmer
3.018
23751101LEADS_P59
Solar/Wind Helper
0.604
235780M24_1
Solar/Wind Harmer
3.726
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.266
WECLTFEXP_WEC->PJM
CLTF
0.129
CPLELTFEXP_CPLE->PJM
CLTF
0.233
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.857
LAGNLTFEXP_LAGN->PJM
CLTF
0.73
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.86
TVALTFEXP_TVA->PJM
CLTF
0.378
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.563
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.427
MECLTFEXP_MEC->PJM
CLTF
0.582
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-015_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:128.68 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:136.41
MW Contribution:3.66
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
7.316
971819AH1-426A GEN
50/50
3.658
971063AG2-658 GEN
Solar/Wind Harmer
25.438
238114M24_2
Solar/Wind Harmer
3.018
23751101LEADS_P59
Solar/Wind Helper
0.604
237033AB1-150 GEN
Solar/Wind Harmer
2.407
960251AF2-316 GEN
Solar/Wind Harmer
14.609
960201AF2-311 GEN
Solar/Wind Harmer
9.74
235780M24_1
Solar/Wind Harmer
3.726
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.266
WECLTFEXP_WEC->PJM
CLTF
0.129
CPLELTFEXP_CPLE->PJM
CLTF
0.233
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.857
LAGNLTFEXP_LAGN->PJM
CLTF
0.73
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.86
TVALTFEXP_TVA->PJM
CLTF
0.378
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.563
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.427
MECLTFEXP_MEC->PJM
CLTF
0.582
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-048_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-048_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:115.75 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:122.7
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.301
237033AB1-150 GEN
Solar/Wind Harmer
0.001
960251AF2-316 GEN
Solar/Wind Harmer
9.588
960201AF2-311 GEN
Solar/Wind Harmer
6.377
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
971063AG2-658 GEN
Solar/Wind Harmer
19.507
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
0.402
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-049_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-049_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:114.78 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:121.67
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.301
237033AB1-150 GEN
Solar/Wind Harmer
0.001
960251AF2-316 GEN
Solar/Wind Harmer
9.588
960201AF2-311 GEN
Solar/Wind Harmer
6.377
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
971063AG2-658 GEN
Solar/Wind Harmer
19.507
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
0.402
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-032_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-032_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:114.52 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:121.39
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-021_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-021_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:111.97 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:118.68
MW Contribution:3.78
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
15.115
960201AF2-311 GEN
Solar/Wind Harmer
10.076
237033AB1-150 GEN
Solar/Wind Harmer
2.145
238114M24_2
Solar/Wind Harmer
2.689
23751101LEADS_P59
Solar/Wind Helper
0.752
235780M24_1
Solar/Wind Harmer
3.32
971817AH1-426 GEN
50/50
7.569
971819AH1-426A GEN
50/50
3.784
NYPJM->LTFIMP_NY
CLTF
0.181
LGEELTFEXP_LGEE->PJM
CLTF
0.269
WECLTFEXP_WEC->PJM
CLTF
0.13
CPLELTFEXP_CPLE->PJM
CLTF
0.23
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.892
LAGNLTFEXP_LAGN->PJM
CLTF
0.733
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.854
TVALTFEXP_TVA->PJM
CLTF
0.379
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.627
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.433
MECLTFEXP_MEC->PJM
CLTF
0.588
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-006_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-006_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:111.9 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:118.61
MW Contribution:3.79
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
15.116
960201AF2-311 GEN
Solar/Wind Harmer
10.077
237033AB1-150 GEN
Solar/Wind Harmer
2.151
238114M24_2
Solar/Wind Harmer
2.697
23751101LEADS_P59
Solar/Wind Helper
0.752
235780M24_1
Solar/Wind Harmer
3.33
971817AH1-426 GEN
50/50
7.57
971819AH1-426A GEN
50/50
3.785
NYPJM->LTFIMP_NY
CLTF
0.181
LGEELTFEXP_LGEE->PJM
CLTF
0.269
WECLTFEXP_WEC->PJM
CLTF
0.13
CPLELTFEXP_CPLE->PJM
CLTF
0.231
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.895
LAGNLTFEXP_LAGN->PJM
CLTF
0.733
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.855
TVALTFEXP_TVA->PJM
CLTF
0.38
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.63
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.434
MECLTFEXP_MEC->PJM
CLTF
0.589
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTTON-01HEATER 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTTON-01HEATER 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:111.26 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:142.41
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
971063AG2-658 GEN
Solar/Wind Harmer
26.038
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTTON-01HEATER 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTTON-01HEATER 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:110.86 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:141.9
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
971063AG2-658 GEN
Solar/Wind Harmer
26.038
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTTON-01HEATER 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTTON-01HEATER 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:110.46 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:141.39
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.464
960251AF2-316 GEN
Solar/Wind Harmer
14.956
960201AF2-311 GEN
Solar/Wind Harmer
9.971
971817AH1-426 GEN
50/50
7.49
971819AH1-426A GEN
50/50
3.745
971063AG2-658 GEN
Solar/Wind Harmer
26.038
238114M24_2
Solar/Wind Harmer
3.089
23751101LEADS_P59
Solar/Wind Helper
0.764
235780M24_1
Solar/Wind Harmer
3.814
NYPJM->LTFIMP_NY
CLTF
0.185
LGEELTFEXP_LGEE->PJM
CLTF
0.275
WECLTFEXP_WEC->PJM
CLTF
0.133
CPLELTFEXP_CPLE->PJM
CLTF
0.24
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.017
LAGNLTFEXP_LAGN->PJM
CLTF
0.753
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.885
TVALTFEXP_TVA->PJM
CLTF
0.39
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.724
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.473
MECLTFEXP_MEC->PJM
CLTF
0.602
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTTON-01HEATER 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-023_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTTON-01HEATER 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-023_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:103.54 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:132.53
MW Contribution:3.66
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.407
960251AF2-316 GEN
Solar/Wind Harmer
14.609
960201AF2-311 GEN
Solar/Wind Harmer
9.74
971063AG2-658 GEN
Solar/Wind Harmer
25.438
238114M24_2
Solar/Wind Harmer
3.018
23751101LEADS_P59
Solar/Wind Helper
0.604
235780M24_1
Solar/Wind Harmer
3.726
971817AH1-426 GEN
50/50
7.316
971819AH1-426A GEN
50/50
3.658
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.266
WECLTFEXP_WEC->PJM
CLTF
0.129
CPLELTFEXP_CPLE->PJM
CLTF
0.233
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.857
LAGNLTFEXP_LAGN->PJM
CLTF
0.73
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.86
TVALTFEXP_TVA->PJM
CLTF
0.378
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.563
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.427
MECLTFEXP_MEC->PJM
CLTF
0.582
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTTON-01HEATER 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-016_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTTON-01HEATER 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-016_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.51 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:132.5
MW Contribution:3.66
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.407
960251AF2-316 GEN
Solar/Wind Harmer
14.609
960201AF2-311 GEN
Solar/Wind Harmer
9.74
971817AH1-426 GEN
50/50
7.316
971819AH1-426A GEN
50/50
3.658
971063AG2-658 GEN
Solar/Wind Harmer
25.438
238114M24_2
Solar/Wind Harmer
3.018
23751101LEADS_P59
Solar/Wind Helper
0.604
235780M24_1
Solar/Wind Harmer
3.726
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.266
WECLTFEXP_WEC->PJM
CLTF
0.129
CPLELTFEXP_CPLE->PJM
CLTF
0.233
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.857
LAGNLTFEXP_LAGN->PJM
CLTF
0.73
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.86
TVALTFEXP_TVA->PJM
CLTF
0.378
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.563
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.427
MECLTFEXP_MEC->PJM
CLTF
0.582
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTTON-01HEATER 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-018_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTTON-01HEATER 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-018_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.51 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:132.5
MW Contribution:3.66
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.407
960251AF2-316 GEN
Solar/Wind Harmer
14.609
960201AF2-311 GEN
Solar/Wind Harmer
9.74
971063AG2-658 GEN
Solar/Wind Harmer
25.438
238114M24_2
Solar/Wind Harmer
3.018
23751101LEADS_P59
Solar/Wind Helper
0.604
235780M24_1
Solar/Wind Harmer
3.726
971817AH1-426 GEN
50/50
7.316
971819AH1-426A GEN
50/50
3.658
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.266
WECLTFEXP_WEC->PJM
CLTF
0.129
CPLELTFEXP_CPLE->PJM
CLTF
0.233
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.857
LAGNLTFEXP_LAGN->PJM
CLTF
0.73
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.86
TVALTFEXP_TVA->PJM
CLTF
0.378
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.563
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.427
MECLTFEXP_MEC->PJM
CLTF
0.582
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01SUTTON-01HEATER 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTTON-01HEATER 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-015_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.04 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:131.9
MW Contribution:3.66
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.407
960251AF2-316 GEN
Solar/Wind Harmer
14.609
960201AF2-311 GEN
Solar/Wind Harmer
9.74
971063AG2-658 GEN
Solar/Wind Harmer
25.438
238114M24_2
Solar/Wind Harmer
3.018
23751101LEADS_P59
Solar/Wind Helper
0.604
235780M24_1
Solar/Wind Harmer
3.726
971817AH1-426 GEN
50/50
7.316
971819AH1-426A GEN
50/50
3.658
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.266
WECLTFEXP_WEC->PJM
CLTF
0.129
CPLELTFEXP_CPLE->PJM
CLTF
0.233
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.857
LAGNLTFEXP_LAGN->PJM
CLTF
0.73
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.86
TVALTFEXP_TVA->PJM
CLTF
0.378
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.563
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.427
MECLTFEXP_MEC->PJM
CLTF
0.582
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:140.95 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:180.41
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
971063AG2-658 GEN
Solar/Wind Harmer
30.081
238114M24_2
Solar/Wind Harmer
3.569
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
4.406
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:140.53 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:179.88
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
971063AG2-658 GEN
Solar/Wind Harmer
30.081
238114M24_2
Solar/Wind Harmer
3.569
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
4.406
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:140.06 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:179.28
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
971063AG2-658 GEN
Solar/Wind Harmer
30.081
238114M24_2
Solar/Wind Harmer
3.569
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
4.406
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-023_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-023_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:133.25 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:170.56
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-018_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-018_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:133.21 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:170.51
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-016_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-016_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:133.21 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:170.51
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-015_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:132.68 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:169.83
MW Contribution:4.24
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.792
960251AF2-316 GEN
Solar/Wind Harmer
16.947
960201AF2-311 GEN
Solar/Wind Harmer
11.298
971063AG2-658 GEN
Solar/Wind Harmer
29.508
238114M24_2
Solar/Wind Harmer
3.501
23751101LEADS_P59
Solar/Wind Helper
0.674
235780M24_1
Solar/Wind Harmer
4.322
971817AH1-426 GEN
50/50
8.487
971819AH1-426A GEN
50/50
4.243
NYPJM->LTFIMP_NY
CLTF
0.207
LGEELTFEXP_LGEE->PJM
CLTF
0.309
WECLTFEXP_WEC->PJM
CLTF
0.149
CPLELTFEXP_CPLE->PJM
CLTF
0.271
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.638
LAGNLTFEXP_LAGN->PJM
CLTF
0.847
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.999
TVALTFEXP_TVA->PJM
CLTF
0.439
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.294
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.657
MECLTFEXP_MEC->PJM
CLTF
0.676
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-048_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-048_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:119.09 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:152.44
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.348
237033AB1-150 GEN
Solar/Wind Harmer
0.001
960251AF2-316 GEN
Solar/Wind Harmer
11.077
960201AF2-311 GEN
Solar/Wind Harmer
7.367
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
971063AG2-658 GEN
Solar/Wind Harmer
22.536
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
0.464
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-049_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-049_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:118.21 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:151.31
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
24446705SUMMERVL
50/50
0.348
237033AB1-150 GEN
Solar/Wind Harmer
0.001
960251AF2-316 GEN
Solar/Wind Harmer
11.077
960201AF2-311 GEN
Solar/Wind Harmer
7.367
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
971063AG2-658 GEN
Solar/Wind Harmer
22.536
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
0.464
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-032_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-032_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:117.91 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:150.93
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
237033AB1-150 GEN
Solar/Wind Harmer
2.847
960251AF2-316 GEN
Solar/Wind Harmer
17.278
960201AF2-311 GEN
Solar/Wind Harmer
11.519
971817AH1-426 GEN
50/50
8.653
971819AH1-426A GEN
50/50
4.326
238114M24_2
Solar/Wind Harmer
3.569
23751101LEADS_P59
Solar/Wind Helper
0.827
235780M24_1
Solar/Wind Harmer
4.406
NYPJM->LTFIMP_NY
CLTF
0.214
LGEELTFEXP_LGEE->PJM
CLTF
0.318
WECLTFEXP_WEC->PJM
CLTF
0.154
CPLELTFEXP_CPLE->PJM
CLTF
0.277
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.791
LAGNLTFEXP_LAGN->PJM
CLTF
0.87
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.023
TVALTFEXP_TVA->PJM
CLTF
0.451
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.448
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.701
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-021_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-021_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:115.46 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:147.79
MW Contribution:4.37
Bus #Bus NameTypeMW Contribution
971817AH1-426 GEN
50/50
8.744
971819AH1-426A GEN
50/50
4.372
238114M24_2
Solar/Wind Harmer
3.107
23751101LEADS_P59
Solar/Wind Helper
0.814
960251AF2-316 GEN
Solar/Wind Harmer
17.462
960201AF2-311 GEN
Solar/Wind Harmer
11.641
237033AB1-150 GEN
Solar/Wind Harmer
2.478
235780M24_1
Solar/Wind Harmer
3.835
NYPJM->LTFIMP_NY
CLTF
0.209
LGEELTFEXP_LGEE->PJM
CLTF
0.311
WECLTFEXP_WEC->PJM
CLTF
0.15
CPLELTFEXP_CPLE->PJM
CLTF
0.267
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.646
LAGNLTFEXP_LAGN->PJM
CLTF
0.846
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.987
TVALTFEXP_TVA->PJM
CLTF
0.438
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.336
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.655
MECLTFEXP_MEC->PJM
CLTF
0.679
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-006_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-006_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:115.39 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:147.7
MW Contribution:4.37
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
17.463
960201AF2-311 GEN
Solar/Wind Harmer
11.642
237033AB1-150 GEN
Solar/Wind Harmer
2.486
971817AH1-426 GEN
50/50
8.745
971819AH1-426A GEN
50/50
4.373
238114M24_2
Solar/Wind Harmer
3.116
23751101LEADS_P59
Solar/Wind Helper
0.814
235780M24_1
Solar/Wind Harmer
3.847
NYPJM->LTFIMP_NY
CLTF
0.209
LGEELTFEXP_LGEE->PJM
CLTF
0.311
WECLTFEXP_WEC->PJM
CLTF
0.15
CPLELTFEXP_CPLE->PJM
CLTF
0.267
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.649
LAGNLTFEXP_LAGN->PJM
CLTF
0.846
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.988
TVALTFEXP_TVA->PJM
CLTF
0.438
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.339
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.656
MECLTFEXP_MEC->PJM
CLTF
0.679
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P7-1_MP-138-015_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P7-1_MP-138-015_SRT-A
Contingency Type:Tower
DC|AC:AC
Final Cycle Loading:102.56 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:131.28
MW Contribution:3.73
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
14.879
960201AF2-311 GEN
Solar/Wind Harmer
9.919
237033AB1-150 GEN
Solar/Wind Harmer
2.088
971817AH1-426 GEN
50/50
7.451
971819AH1-426A GEN
50/50
3.726
238114M24_2
Solar/Wind Harmer
2.618
971063AG2-658 GEN
Solar/Wind Harmer
11.007
235780M24_1
Solar/Wind Harmer
3.232
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.271
WECLTFEXP_WEC->PJM
CLTF
0.13
CPLELTFEXP_CPLE->PJM
CLTF
0.244
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.94
LAGNLTFEXP_LAGN->PJM
CLTF
0.745
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.892
TVALTFEXP_TVA->PJM
CLTF
0.387
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.579
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.457
MECLTFEXP_MEC->PJM
CLTF
0.589
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line l/o AEP_P4_#2942_05KAMMER 765_PP_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line
Contingency Name:
AEP_P4_#2942_05KAMMER 765_PP_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.83 %
Rating:314.0 MVA
Rating Type:B
MVA to Mitigate:316.61
MW Contribution:16.24
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
64.849
960201AF2-311 GEN
Solar/Wind Harmer
43.233
237033AB1-150 GEN
Solar/Wind Helper
1.726
23751101LEADS_P59
Solar/Wind Helper
0.635
235780M24_1
Solar/Wind Helper
4.277
971817AH1-426 GEN
50/50
32.475
971819AH1-426A GEN
50/50
16.237
971061AG2-657 GEN
Solar/Wind Harmer
10.046
NYPJM->LTFIMP_NY
CLTF
0.251
LGEELTFEXP_LGEE->PJM
CLTF
0.41
WECLTFEXP_WEC->PJM
CLTF
0.198
CPLELTFEXP_CPLE->PJM
CLTF
0.327
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.286
LAGNLTFEXP_LAGN->PJM
CLTF
1.075
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.21
TVALTFEXP_TVA->PJM
CLTF
0.553
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.953
CBM South 1LTFEXP_CBM-S1->PJM
CBM
2.108
MECLTFEXP_MEC->PJM
CLTF
0.886
SIGELTFEXP_SIGE->PJM
CLTF
0.03

Details for AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line l/o AP_P2-3_MP-500-020_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-500-020_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.63 %
Rating:314.0 MVA
Rating Type:B
MVA to Mitigate:315.99
MW Contribution:16.23
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
64.841
960201AF2-311 GEN
Solar/Wind Harmer
43.228
237033AB1-150 GEN
Solar/Wind Helper
1.726
971817AH1-426 GEN
50/50
32.471
971819AH1-426A GEN
50/50
16.235
971061AG2-657 GEN
Solar/Wind Harmer
10.043
23751101LEADS_P59
Solar/Wind Helper
0.634
235780M24_1
Solar/Wind Helper
4.278
NYPJM->LTFIMP_NY
CLTF
0.249
LGEELTFEXP_LGEE->PJM
CLTF
0.408
WECLTFEXP_WEC->PJM
CLTF
0.196
CPLELTFEXP_CPLE->PJM
CLTF
0.327
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.251
LAGNLTFEXP_LAGN->PJM
CLTF
1.071
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.208
TVALTFEXP_TVA->PJM
CLTF
0.551
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.911
CBM South 1LTFEXP_CBM-S1->PJM
CBM
2.099
MECLTFEXP_MEC->PJM
CLTF
0.882
SIGELTFEXP_SIGE->PJM
CLTF
0.03

Details for AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line l/o AP_P2-3_MP-500-021_SRT-SL


Base Case Flowgate

Area:AP
Facility Description:
AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-500-021_SRT-SL
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.63 %
Rating:314.0 MVA
Rating Type:B
MVA to Mitigate:315.97
MW Contribution:16.24
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
64.847
960201AF2-311 GEN
Solar/Wind Harmer
43.231
237033AB1-150 GEN
Solar/Wind Helper
1.726
971817AH1-426 GEN
50/50
32.474
971819AH1-426A GEN
50/50
16.237
971061AG2-657 GEN
Solar/Wind Harmer
10.046
23751101LEADS_P59
Solar/Wind Helper
0.635
235780M24_1
Solar/Wind Helper
4.277
NYPJM->LTFIMP_NY
CLTF
0.25
LGEELTFEXP_LGEE->PJM
CLTF
0.41
WECLTFEXP_WEC->PJM
CLTF
0.197
CPLELTFEXP_CPLE->PJM
CLTF
0.327
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.279
LAGNLTFEXP_LAGN->PJM
CLTF
1.074
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.21
TVALTFEXP_TVA->PJM
CLTF
0.553
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.944
CBM South 1LTFEXP_CBM-S1->PJM
CBM
2.106
MECLTFEXP_MEC->PJM
CLTF
0.885
SIGELTFEXP_SIGE->PJM
CLTF
0.03

Details for AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line l/o AEP_P4_#37_05MOUNTN 765_B1_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
AF2-311 TP-01GILBOA 138.0 kV Ckt 1 line
Contingency Name:
AEP_P4_#37_05MOUNTN 765_B1_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.62 %
Rating:314.0 MVA
Rating Type:B
MVA to Mitigate:315.96
MW Contribution:16.24
Bus #Bus NameTypeMW Contribution
960251AF2-316 GEN
Solar/Wind Harmer
64.85
960201AF2-311 GEN
Solar/Wind Harmer
43.233
237033AB1-150 GEN
Solar/Wind Helper
1.726
971817AH1-426 GEN
50/50
32.475
971819AH1-426A GEN
50/50
16.238
971061AG2-657 GEN
Solar/Wind Harmer
10.047
23751101LEADS_P59
Solar/Wind Helper
0.635
235780M24_1
Solar/Wind Helper
4.277
NYPJM->LTFIMP_NY
CLTF
0.25
LGEELTFEXP_LGEE->PJM
CLTF
0.411
WECLTFEXP_WEC->PJM
CLTF
0.198
CPLELTFEXP_CPLE->PJM
CLTF
0.327
CBM West 2LTFEXP_CBM-W2->PJM
CBM
7.291
LAGNLTFEXP_LAGN->PJM
CLTF
1.076
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.211
TVALTFEXP_TVA->PJM
CLTF
0.554
CBM West 1LTFEXP_CBM-W1->PJM
CBM
6.959
CBM South 1LTFEXP_CBM-S1->PJM
CBM
2.11
MECLTFEXP_MEC->PJM
CLTF
0.887
SIGELTFEXP_SIGE->PJM
CLTF
0.03
CONTINGENCY 'AP_P2-2_MP-138-024_SRT-A'
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 235389 CKT 1   /*01BAYS       138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235317 TO BUS 235389 CKT 1   /*01CRAIGV     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235328 TO BUS 235389 CKT 1   /*01ENONTP     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235350 TO BUS 235389 CKT 1   /*01IVYDAL     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235389 TO BUS 236979 CKT 1   /*01POWELM     138.0 - 01POWEL MT    23.0
 REMOVE SWSHUNT FROM BUS 235389                          /*01POWELM     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-084T_SRT-A'
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 235389 CKT 1   /*01BAYS       138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235317 TO BUS 235389 CKT 1   /*01CRAIGV     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235328 TO BUS 235389 CKT 1   /*01ENONTP     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235350 TO BUS 235389 CKT 1   /*01IVYDAL     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235389 TO BUS 236979 CKT 1   /*01POWELM     138.0 - 01POWEL MT    23.0
 DISCONNECT BRANCH FROM BUS 247793 TO BUS 235350 CKT 1   /*05LINDEN RD  138.0 - 01IVYDAL     138.0
 REDUCE BUS 235389 SHUNT BY 100 PERCENT                  /*01POWELM     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-083_SRT-A'
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 235389 CKT 1   /*01BAYS       138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235317 TO BUS 235389 CKT 1   /*01CRAIGV     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235328 TO BUS 235389 CKT 1   /*01ENONTP     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235350 TO BUS 235389 CKT 1   /*01IVYDAL     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235389 TO BUS 236979 CKT 1   /*01POWELM     138.0 - 01POWEL MT    23.0
 REMOVE SWSHUNT FROM BUS 235389                          /*01POWELM     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-082_SRT-A'
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 235389 CKT 1   /*01BAYS       138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 235431 CKT 1   /*01BAYS       138.0 - 01WOLFRN     138.0
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 237258 CKT 1   /*01BAYS       138.0 - 01BAYS        66.0
 DISCONNECT BRANCH FROM BUS 235317 TO BUS 235389 CKT 1   /*01CRAIGV     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235328 TO BUS 235389 CKT 1   /*01ENONTP     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235350 TO BUS 235389 CKT 1   /*01IVYDAL     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235389 TO BUS 236979 CKT 1   /*01POWELM     138.0 - 01POWEL MT    23.0
 DISCONNECT BRANCH FROM BUS 235411 TO BUS 235437 CKT 1   /*01SUTTON     138.0 - 01SUTT T     138.0
 DISCONNECT BRANCH FROM BUS 235412 TO BUS 235437 CKT 1   /*01SUTTNH     138.0 - 01SUTT T     138.0
 DISCONNECT BRANCH FROM BUS 235412 TO BUS 237289 CKT 1   /*01SUTTNH     138.0 - 01SUTTN H     66.0
 DISCONNECT BRANCH FROM BUS 235431 TO BUS 235437 CKT 1   /*01WOLFRN     138.0 - 01SUTT T     138.0
 REMOVE SWSHUNT FROM BUS 235389                          /*01POWELM     138.0
END
CONTINGENCY 'AP_P2-2_MP-138-088_SRT-A'
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 235389 CKT 1   /*01BAYS       138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 235431 CKT 1   /*01BAYS       138.0 - 01WOLFRN     138.0
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 237258 CKT 1   /*01BAYS       138.0 - 01BAYS        66.0
 DISCONNECT BRANCH FROM BUS 235411 TO BUS 235437 CKT 1   /*01SUTTON     138.0 - 01SUTT T     138.0
 DISCONNECT BRANCH FROM BUS 235412 TO BUS 235437 CKT 1   /*01SUTTNH     138.0 - 01SUTT T     138.0
 DISCONNECT BRANCH FROM BUS 235412 TO BUS 237289 CKT 1   /*01SUTTNH     138.0 - 01SUTTN H     66.0
 DISCONNECT BRANCH FROM BUS 235431 TO BUS 235437 CKT 1   /*01WOLFRN     138.0 - 01SUTT T     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-111_SRT-A'
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 235389 CKT 1   /*01BAYS       138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 235431 CKT 1   /*01BAYS       138.0 - 01WOLFRN     138.0
 DISCONNECT BRANCH FROM BUS 235296 TO BUS 237258 CKT 1   /*01BAYS       138.0 - 01BAYS        66.0
 DISCONNECT BRANCH FROM BUS 235411 TO BUS 235437 CKT 1   /*01SUTTON     138.0 - 01SUTT T     138.0
 DISCONNECT BRANCH FROM BUS 235412 TO BUS 235437 CKT 1   /*01SUTTNH     138.0 - 01SUTT T     138.0
 DISCONNECT BRANCH FROM BUS 235412 TO BUS 237289 CKT 1   /*01SUTTNH     138.0 - 01SUTTN H     66.0
 DISCONNECT BRANCH FROM BUS 235431 TO BUS 235437 CKT 1   /*01WOLFRN     138.0 - 01SUTT T     138.0
END
CONTINGENCY 'AP_P2-2_MP-138-070_SRT-A'
 DISCONNECT BRANCH FROM BUS 235411 TO BUS 235437 CKT 1   /*01SUTTON     138.0 - 01SUTT T     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-113_SRT-A'
 DISCONNECT BRANCH FROM BUS 235332 TO BUS 235348 CKT 1   /*01FRNCHC     138.0 - 01HEATER     138.0
 DISCONNECT BRANCH FROM BUS 235348 TO BUS 235411 CKT 1   /*01HEATER     138.0 - 01SUTTON     138.0
 DISCONNECT BRANCH FROM BUS 235411 TO BUS 235437 CKT 1   /*01SUTTON     138.0 - 01SUTT T     138.0
 REMOVE SWSHUNT FROM BUS 235411                          /*01SUTTON     138.0
END
CONTINGENCY 'AP_P2-2_MP-138-069_SRT-A'
 DISCONNECT BRANCH FROM BUS 235332 TO BUS 235348 CKT 1   /*01FRNCHC     138.0 - 01HEATER     138.0
 DISCONNECT BRANCH FROM BUS 235348 TO BUS 235411 CKT 1   /*01HEATER     138.0 - 01SUTTON     138.0
 REMOVE SWSHUNT FROM BUS 235411                          /*01SUTTON     138.0
END
CONTINGENCY 'AEP_P2-2_#16040_05CARBND 138_1_SRT-A'
 OPEN BRANCH FROM BUS 235626 TO BUS 242551 CKT 1    /*01JONESB     138.0 - 05BELVA      138.0
 OPEN BRANCH FROM BUS 242551 TO BUS 242580 CKT 1    /*05BELVA      138.0 - 05CARBND     138.0
 OPEN BRANCH FROM BUS 242551 TO BUS 244824 CKT 1A   /*05BELVA      138.0 - 05BELVA       46.0
 OPEN BRANCH FROM BUS 242580 TO BUS 244878 CKT 1    /*05CARBND     138.0 - 05CARBNDEQ     1.0
 OPEN BRANCH FROM BUS 242580 TO BUS 971060 CKT 1    /*05CARBND     138.0 - AG2-657 TP   138.0
 OPEN BRANCH FROM BUS 244387 TO BUS 244878 CKT 1    /*05CARBONDL    69.0 - 05CARBNDEQ     1.0
 OPEN BRANCH FROM BUS 244824 TO BUS 244825 CKT 1    /*05BELVA       46.0 - 05BICKMORE    46.0
 OPEN BRANCH FROM BUS 244878 TO BUS 244879 CKT 1    /*05CARBNDEQ     1.0 - 05CARBONDL    46.0
 OPEN BRANCH FROM BUS 960200 TO BUS 235626 CKT 1    /*AF2-311 TP   138.0 - 01JONESB     138.0
END
CONTINGENCY 'AEP_P7-1_#10944___SRT-A'
 OPEN BRANCH FROM BUS 242528 TO BUS 242940 CKT 1   /*05SPORN      345.0 - 05MUSKNG     345.0
 OPEN BRANCH FROM BUS 242940 TO BUS 242947 CKT 1   /*05MUSKNG     345.0 - 05WATERFORD  345.0
END
CONTINGENCY 'AP_P7-1_MP-138-015_SRT-A'
 DISCONNECT BRANCH FROM BUS 235324 TO BUS 235336 CKT 1   /*01EDGELN     138.0 - 01GOFFRN     138.0
 DISCONNECT BRANCH FROM BUS 235335 TO BUS 235339 CKT 1   /*01GLENVL     138.0 - 01GRANTV     138.0
 DISCONNECT BRANCH FROM BUS 235336 TO BUS 235339 CKT 1   /*01GOFFRN     138.0 - 01GRANTV     138.0
END
CONTINGENCY 'AP_P2-2_MP-138-035_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235316 CKT 1   /*01BACKFK     138.0 - 01COWEN      138.0
END
CONTINGENCY 'AP_P2-4_MP-138-102_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235316 CKT 1   /*01BACKFK     138.0 - 01COWEN      138.0
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235387 CKT 1   /*01BACKFK     138.0 - 01PICKEN     138.0
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 236955 CKT 1   /*01BACKFK     138.0 - 01BACK FRK    23.0
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 236955 CKT 2   /*01BACKFK     138.0 - 01BACK FRK    23.0
END
CONTINGENCY 'AP_P2-2_MP-138-034_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235387 CKT 1   /*01BACKFK     138.0 - 01PICKEN     138.0
END
CONTINGENCY 'AP_P2-2_MP-138-023_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235387 CKT 1   /*01BACKFK     138.0 - 01PICKEN     138.0
 DISCONNECT BRANCH FROM BUS 235332 TO BUS 235387 CKT 1   /*01FRNCHC     138.0 - 01PICKEN     138.0
 DISCONNECT BRANCH FROM BUS 235373 TO BUS 235387 CKT 1   /*01MONTRV     138.0 - 01PICKEN     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235441 CKT 1   /*01PICKEN     138.0 - 01DURB T     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-016_SRT-A'
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235295 CKT 1   /*01PICKEN     138.0 - 01BACKFK     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235332 CKT 1   /*01PICKEN     138.0 - 01FRNCHC     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235373 CKT 1   /*01PICKEN     138.0 - 01MONTRV     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235441 CKT 1   /*01PICKEN     138.0 - 01DURB T     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-018_SRT-A'
 DISCONNECT BRANCH FROM BUS 235360 TO BUS 235373 CKT 1   /*01LINWD      138.0 - 01MONTRV     138.0
 DISCONNECT BRANCH FROM BUS 235360 TO BUS 237243 CKT 1   /*01LINWD      138.0 - 01LINWOOD     66.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235295 CKT 1   /*01PICKEN     138.0 - 01BACKFK     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235332 CKT 1   /*01PICKEN     138.0 - 01FRNCHC     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235373 CKT 1   /*01PICKEN     138.0 - 01MONTRV     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235441 CKT 1   /*01PICKEN     138.0 - 01DURB T     138.0
 DISCONNECT BRANCH FROM BUS 237198 TO BUS 235360 CKT 2   /*01LINWOOD     34.5 - 01LINWD      138.0
END
CONTINGENCY 'AP_P2-3_MP-138-015_SRT-A'
 DISCONNECT BRANCH FROM BUS 235322 TO BUS 237240 CKT 1   /*01DURBIN     138.0 - 01DURBIN      66.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235295 CKT 1   /*01PICKEN     138.0 - 01BACKFK     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235332 CKT 1   /*01PICKEN     138.0 - 01FRNCHC     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235373 CKT 1   /*01PICKEN     138.0 - 01MONTRV     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235441 CKT 1   /*01PICKEN     138.0 - 01DURB T     138.0
 DISCONNECT BRANCH FROM BUS 235441 TO BUS 235302 CKT 1   /*01DURB T     138.0 - 01BEVRLY     138.0
 DISCONNECT BRANCH FROM BUS 235441 TO BUS 235322 CKT 1   /*01DURB T     138.0 - 01DURBIN     138.0
 REMOVE SWSHUNT FROM BUS 235322                          /*01DURBIN     138.0
END
CONTINGENCY 'AP_P1-2_MP-138-048_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235316 CKT 1   /*01BACKFK     138.0 - 01COWEN      138.0
END
CONTINGENCY 'AP_P1-2_MP-138-049_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235387 CKT 1   /*01BACKFK     138.0 - 01PICKEN     138.0
END
CONTINGENCY 'AP_P2-2_MP-138-032_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235316 CKT 1   /*01BACKFK     138.0 - 01COWEN      138.0
 DISCONNECT BRANCH FROM BUS 235316 TO BUS 235318 CKT 1   /*01COWEN      138.0 - 01CRUPRN     138.0
 DISCONNECT BRANCH FROM BUS 235316 TO BUS 236960 CKT 2   /*01COWEN      138.0 - 01COWEN       23.0
END
CONTINGENCY 'AP_P2-3_MP-138-021_SRT-A'
 DISCONNECT BRANCH FROM BUS 235316 TO BUS 235318 CKT 1   /*01COWEN      138.0 - 01CRUPRN     138.0
 DISCONNECT BRANCH FROM BUS 235317 TO BUS 235318 CKT 1   /*01CRAIGV     138.0 - 01CRUPRN     138.0
 DISCONNECT BRANCH FROM BUS 235317 TO BUS 235389 CKT 1   /*01CRAIGV     138.0 - 01POWELM     138.0
 DISCONNECT BRANCH FROM BUS 235317 TO BUS 236962 CKT 1   /*01CRAIGV     138.0 - 01CRAIGSV     23.0
 DISCONNECT BRANCH FROM BUS 235318 TO BUS 235376 CKT 1   /*01CRUPRN     138.0 - 01NETTIE     138.0
 DISCONNECT BRANCH FROM BUS 235318 TO BUS 236963 CKT 1   /*01CRUPRN     138.0 - 01CRUPPRN     23.0
 REMOVE SWSHUNT FROM BUS 235318                          /*01CRUPRN     138.0
END
CONTINGENCY 'AP_P2-2_MP-138-006_SRT-A'
 DISCONNECT BRANCH FROM BUS 235316 TO BUS 235318 CKT 1   /*01COWEN      138.0 - 01CRUPRN     138.0
 DISCONNECT BRANCH FROM BUS 235317 TO BUS 235318 CKT 1   /*01CRAIGV     138.0 - 01CRUPRN     138.0
 DISCONNECT BRANCH FROM BUS 235318 TO BUS 235376 CKT 1   /*01CRUPRN     138.0 - 01NETTIE     138.0
 DISCONNECT BRANCH FROM BUS 235318 TO BUS 236963 CKT 1   /*01CRUPRN     138.0 - 01CRUPPRN     23.0
 REMOVE SWSHUNT FROM BUS 235318                          /*01CRUPRN     138.0
END
CONTINGENCY 'AP_P2-2_MP-138-017A_SRT-A'
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 235376 CKT 1   /*01GRASSY     138.0 - 01NETTIE     138.0
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 235410 CKT 1   /*01GRASSY     138.0 - 01SUMMRV     138.0
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 235817 CKT 1   /*01GRASSY     138.0 - M24 C        138.0
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 247822 CKT 1   /*01GRASSY     138.0 - 05QUINWOOD   138.0
 REMOVE SWSHUNT FROM BUS 235340                          /*01GRASSY     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-169T_SRT-A'
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 235376 CKT 1   /*01GRASSY     138.0 - 01NETTIE     138.0
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 235410 CKT 1   /*01GRASSY     138.0 - 01SUMMRV     138.0
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 235817 CKT 1   /*01GRASSY     138.0 - M24 C        138.0
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 247822 CKT 1   /*01GRASSY     138.0 - 05QUINWOOD   138.0
 REDUCE BUS 235340 SHUNT BY 100 PERCENT                  /*01GRASSY     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-168T_SRT-A'
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 235376 CKT 1   /*01GRASSY     138.0 - 01NETTIE     138.0
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 235410 CKT 1   /*01GRASSY     138.0 - 01SUMMRV     138.0
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 235817 CKT 1   /*01GRASSY     138.0 - M24 C        138.0
 DISCONNECT BRANCH FROM BUS 235340 TO BUS 247822 CKT 1   /*01GRASSY     138.0 - 05QUINWOOD   138.0
 DISCONNECT BRANCH FROM BUS 235376 TO BUS 235318 CKT 1   /*01NETTIE     138.0 - 01CRUPRN     138.0
 DISCONNECT BRANCH FROM BUS 235376 TO BUS 236974 CKT 1   /*01NETTIE     138.0 - 01NETTIE      23.0
 REDUCE BUS 235340 SHUNT BY 100 PERCENT                  /*01GRASSY     138.0
END
CONTINGENCY 'AEP_P4_#2942_05KAMMER 765_PP_SRT-A'
 OPEN BRANCH FROM BUS 235102 TO BUS 242920 CKT 5   /*01BELMNT     500.0 - 05BELMON     765.0
 OPEN BRANCH FROM BUS 242516 TO BUS 242920 CKT 1   /*05MOUNTN     765.0 - 05BELMON     765.0
 OPEN BRANCH FROM BUS 242920 TO BUS 242925 CKT 1   /*05BELMON     765.0 - 05KAMMER     765.0
 OPEN BRANCH FROM BUS 242925 TO BUS 243188 CKT 1   /*05KAMMER     765.0 - 05MLG1        26.0
 REMOVE UNIT 1 FROM BUS 243188                     /*05MLG1        26.0
END
CONTINGENCY 'AP_P2-3_MP-500-020_SRT-SL'
 DISCONNECT BRANCH FROM BUS 235102 TO BUS 235299 CKT 1          /*01BELMNT     500.0 - 01BELMNT     138.0
 DISCONNECT BRANCH FROM BUS 235102 TO BUS 235299 CKT 2          /*01BELMNT     500.0 - 01BELMNT     138.0
 DISCONNECT BRANCH FROM BUS 235102 TO BUS 242920 CKT 5          /*01BELMNT     500.0 - 05BELMON     765.0
 DISCONNECT BRANCH FROM BUS 242920 TO BUS 242516 CKT 1          /*05BELMON     765.0 - 05MOUNTN     765.0
 DISCONNECT BRANCH FROM BUS 242920 TO BUS 242925 CKT 1          /*05BELMON     765.0 - 05KAMMER     765.0
 DISCONNECT BUS 242920                                          /*05BELMON     765.0
 SET POSTCONTRATING 2492 BRANCH FROM BUS 235102 TO BUS 235235 CKT 1 /*01BELMNT     500.0 - 01FLINTRUN   500.0
 SET PRECONTRATING 1986 BRANCH FROM BUS 235102 TO BUS 235235 CKT 1 /*01BELMNT     500.0 - 01FLINTRUN   500.0
END
CONTINGENCY 'AP_P2-3_MP-500-021_SRT-SL'
 DISCONNECT BRANCH FROM BUS 235102 TO BUS 235299 CKT 3          /*01BELMNT     500.0 - 01BELMNT     138.0
 DISCONNECT BRANCH FROM BUS 235102 TO BUS 242920 CKT 5          /*01BELMNT     500.0 - 05BELMON     765.0
 DISCONNECT BRANCH FROM BUS 242920 TO BUS 242516 CKT 1          /*05BELMON     765.0 - 05MOUNTN     765.0
 DISCONNECT BRANCH FROM BUS 242920 TO BUS 242925 CKT 1          /*05BELMON     765.0 - 05KAMMER     765.0
 DISCONNECT BUS 242920                                          /*05BELMON     765.0
 SET POSTCONTRATING 2492 BRANCH FROM BUS 235102 TO BUS 235235 CKT 1 /*01BELMNT     500.0 - 01FLINTRUN   500.0
 SET PRECONTRATING 1986 BRANCH FROM BUS 235102 TO BUS 235235 CKT 1 /*01BELMNT     500.0 - 01FLINTRUN   500.0
END
CONTINGENCY 'AEP_P4_#37_05MOUNTN 765_B1_SRT-A'
 OPEN BRANCH FROM BUS 235102 TO BUS 242920 CKT 5   /*01BELMNT     500.0 - 05BELMON     765.0
 OPEN BRANCH FROM BUS 242516 TO BUS 242920 CKT 1   /*05MOUNTN     765.0 - 05BELMON     765.0
 OPEN BRANCH FROM BUS 242920 TO BUS 242925 CKT 1   /*05BELMON     765.0 - 05KAMMER     765.0
END
235295 to 235387 ckt 1
235296 to 235431 ckt 1
235316 to 235295 ckt 1
235328 to 235389 ckt 1
235348 to 235332 ckt 1
235376 to 235318 ckt 1
235389 to 235296 ckt 1
235437 to 235411 ckt 1
235411 to 235348 ckt 1
235431 to 235437 ckt 1
960200 to 235333 ckt 1

Winter Peak Analysis

The New Service Request AH1-426A was evaluated as a 32.3 MW (32.3 MW Capacity) injection in the APS area.

AH1-426A was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 96.9 MW (32.3 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Light Load Analysis

The New Service Request AH1-426A was evaluated as a 32.3 MW injection and 32.3 MW withdrawal in the APS area.

AH1-426A was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 96.9 MW (32.3 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P1-2_MP-138-048_SRT-A
SingleAC130.34 %106.0B138.164.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC130.33 %106.0B138.154.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC130.19 %106.0B138.04.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P1-2_MP-138-049_SRT-A
SingleAC130.02 %106.0B137.824.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC130.02 %106.0B137.824.33
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
AP_P2-3_MP-138-016_SRT-A
BreakerAC124.5 %106.0B131.974.25
GD2AP
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Base Case
SingleAC104.89 %85.0A89.153.32
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P1-2_MP-138-048_SRT-A
SingleAC109.54 %128.0B140.214.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC109.54 %128.0B140.214.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC109.41 %128.0B140.054.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P1-2_MP-138-049_SRT-A
SingleAC109.27 %128.0B139.874.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC109.27 %128.0B139.874.33
GD2AP
01POWELM-01BAYS 138.0 kV Ckt 1 line
AP_P2-3_MP-138-018_SRT-A
BreakerAC104.7 %128.0B134.014.25
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P1-2_MP-138-048_SRT-A
SingleAC108.16 %106.0B114.643.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC108.16 %106.0B114.643.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC108.01 %106.0B114.53.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P1-2_MP-138-049_SRT-A
SingleAC107.87 %106.0B114.343.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC107.87 %106.0B114.343.75
GD2AP
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
AP_P2-3_MP-138-016_SRT-A
BreakerAC104.64 %106.0B110.923.66
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P1-2_MP-138-048_SRT-A
SingleAC107.84 %128.0B138.044.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-2_MP-138-035_SRT-A
BusAC107.84 %128.0B138.034.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-4_MP-138-102_SRT-A
BreakerAC107.72 %128.0B137.884.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P1-2_MP-138-049_SRT-A
SingleAC107.59 %128.0B137.714.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-2_MP-138-034_SRT-A
BusAC107.58 %128.0B137.74.33
GD2AP
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
AP_P2-3_MP-138-018_SRT-A
BreakerAC103.02 %128.0B131.864.25

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-048_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-048_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:130.34 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:138.16
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:130.33 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:138.15
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:130.19 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:138.0
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-049_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-049_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:130.02 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:137.82
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:130.02 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:137.82
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-016_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-016_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:124.5 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:131.97
MW Contribution:4.25
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.248
971063AG2-658 GEN
Solar/Wind Harmer
18.886
971817AH1-426 GEN
50/50
8.495
238114M24_2
Solar/Wind Harmer
5.591
238115M24_BAT
50/50
4.807
960201AF2-311 GEN
Solar/Wind Harmer
7.233
23751101LEADS_P59
Solar/Wind Helper
1.517
235780M24_1
Solar/Wind Harmer
6.411
237033AB1-150 GEN
Solar/Wind Harmer
3.547
960251AF2-316 GEN
Solar/Wind Harmer
10.849
CPLELTFEXP_CPLE->PJM
CLTF
0.296
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.794
LAGNLTFEXP_LAGN->PJM
CLTF
0.869
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.065
TVALTFEXP_TVA->PJM
CLTF
0.449
NYPJM->LTFIMP_NY
CLTF
0.2
LGEELTFEXP_LGEE->PJM
CLTF
0.316
WECLTFEXP_WEC->PJM
CLTF
0.154
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.655
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.406
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.693
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01BAYS-01WOLFRN 138.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:AP
Facility Description:
01BAYS-01WOLFRN 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:104.89 %
Rating:85.0 MVA
Rating Type:A
MVA to Mitigate:89.15
MW Contribution:3.32
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
3.32
971063AG2-658 GEN
Solar/Wind Harmer
5.859
971817AH1-426 GEN
50/50
6.639
238114M24_2
Solar/Wind Harmer
3.705
238115M24_BAT
50/50
3.185
960201AF2-311 GEN
Solar/Wind Harmer
5.653
235780M24_1
Solar/Wind Harmer
4.249
960251AF2-316 GEN
Solar/Wind Harmer
8.479
237033AB1-150 GEN
Solar/Wind Harmer
2.351
CPLELTFEXP_CPLE->PJM
CLTF
0.221
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.369
LAGNLTFEXP_LAGN->PJM
CLTF
0.654
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.796
TVALTFEXP_TVA->PJM
CLTF
0.337
NYPJM->LTFIMP_NY
CLTF
0.15
LGEELTFEXP_LGEE->PJM
CLTF
0.239
WECLTFEXP_WEC->PJM
CLTF
0.116
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.221
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.099
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.274
MECLTFEXP_MEC->PJM
CLTF
0.525
SIGELTFEXP_SIGE->PJM
CLTF
0.018

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-048_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-048_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:109.54 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:140.21
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:109.54 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:140.21
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:109.41 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:140.05
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-049_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-049_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:109.27 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:139.87
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:109.27 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:139.87
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01POWELM-01BAYS 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-018_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01POWELM-01BAYS 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-018_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.7 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:134.01
MW Contribution:4.25
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.248
971063AG2-658 GEN
Solar/Wind Harmer
18.886
971817AH1-426 GEN
50/50
8.495
238114M24_2
Solar/Wind Harmer
5.591
238115M24_BAT
50/50
4.807
960201AF2-311 GEN
Solar/Wind Harmer
7.233
23751101LEADS_P59
Solar/Wind Helper
1.517
235780M24_1
Solar/Wind Harmer
6.411
237033AB1-150 GEN
Solar/Wind Harmer
3.547
960251AF2-316 GEN
Solar/Wind Harmer
10.849
CPLELTFEXP_CPLE->PJM
CLTF
0.296
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.794
LAGNLTFEXP_LAGN->PJM
CLTF
0.869
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.065
TVALTFEXP_TVA->PJM
CLTF
0.449
NYPJM->LTFIMP_NY
CLTF
0.2
LGEELTFEXP_LGEE->PJM
CLTF
0.316
WECLTFEXP_WEC->PJM
CLTF
0.154
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.655
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.406
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.693
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-048_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-048_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:108.16 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:114.64
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
3.749
971063AG2-658 GEN
Solar/Wind Harmer
16.667
971817AH1-426 GEN
50/50
7.498
238114M24_2
Solar/Wind Harmer
4.934
238115M24_BAT
50/50
4.242
960201AF2-311 GEN
Solar/Wind Harmer
6.384
23751101LEADS_P59
Solar/Wind Helper
1.719
235780M24_1
Solar/Wind Harmer
5.658
237033AB1-150 GEN
Solar/Wind Harmer
3.13
960251AF2-316 GEN
Solar/Wind Harmer
9.575
CPLELTFEXP_CPLE->PJM
CLTF
0.264
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.175
LAGNLTFEXP_LAGN->PJM
CLTF
0.776
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.949
TVALTFEXP_TVA->PJM
CLTF
0.401
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.282
WECLTFEXP_WEC->PJM
CLTF
0.138
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.457
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.845
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.511
MECLTFEXP_MEC->PJM
CLTF
0.621
SIGELTFEXP_SIGE->PJM
CLTF
0.021

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:108.16 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:114.64
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
3.749
971063AG2-658 GEN
Solar/Wind Harmer
16.667
971817AH1-426 GEN
50/50
7.498
238114M24_2
Solar/Wind Harmer
4.934
238115M24_BAT
50/50
4.242
960201AF2-311 GEN
Solar/Wind Harmer
6.384
23751101LEADS_P59
Solar/Wind Helper
1.719
235780M24_1
Solar/Wind Harmer
5.658
237033AB1-150 GEN
Solar/Wind Harmer
3.13
960251AF2-316 GEN
Solar/Wind Harmer
9.575
CPLELTFEXP_CPLE->PJM
CLTF
0.264
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.175
LAGNLTFEXP_LAGN->PJM
CLTF
0.776
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.949
TVALTFEXP_TVA->PJM
CLTF
0.401
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.282
WECLTFEXP_WEC->PJM
CLTF
0.138
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.457
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.845
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.511
MECLTFEXP_MEC->PJM
CLTF
0.621
SIGELTFEXP_SIGE->PJM
CLTF
0.021

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.01 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:114.5
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
3.749
971063AG2-658 GEN
Solar/Wind Harmer
16.667
971817AH1-426 GEN
50/50
7.498
238114M24_2
Solar/Wind Harmer
4.934
238115M24_BAT
50/50
4.242
960201AF2-311 GEN
Solar/Wind Harmer
6.384
23751101LEADS_P59
Solar/Wind Helper
1.719
235780M24_1
Solar/Wind Harmer
5.658
237033AB1-150 GEN
Solar/Wind Harmer
3.13
960251AF2-316 GEN
Solar/Wind Harmer
9.575
CPLELTFEXP_CPLE->PJM
CLTF
0.264
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.175
LAGNLTFEXP_LAGN->PJM
CLTF
0.776
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.949
TVALTFEXP_TVA->PJM
CLTF
0.401
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.282
WECLTFEXP_WEC->PJM
CLTF
0.138
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.457
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.845
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.511
MECLTFEXP_MEC->PJM
CLTF
0.621
SIGELTFEXP_SIGE->PJM
CLTF
0.021

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-049_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-049_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.87 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:114.34
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
3.749
971063AG2-658 GEN
Solar/Wind Harmer
16.667
971817AH1-426 GEN
50/50
7.498
238114M24_2
Solar/Wind Harmer
4.934
238115M24_BAT
50/50
4.242
960201AF2-311 GEN
Solar/Wind Harmer
6.384
23751101LEADS_P59
Solar/Wind Helper
1.719
235780M24_1
Solar/Wind Harmer
5.658
237033AB1-150 GEN
Solar/Wind Harmer
3.13
960251AF2-316 GEN
Solar/Wind Harmer
9.575
CPLELTFEXP_CPLE->PJM
CLTF
0.264
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.175
LAGNLTFEXP_LAGN->PJM
CLTF
0.776
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.949
TVALTFEXP_TVA->PJM
CLTF
0.401
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.282
WECLTFEXP_WEC->PJM
CLTF
0.138
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.457
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.845
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.511
MECLTFEXP_MEC->PJM
CLTF
0.621
SIGELTFEXP_SIGE->PJM
CLTF
0.021

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:107.87 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:114.34
MW Contribution:3.75
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
3.749
971063AG2-658 GEN
Solar/Wind Harmer
16.667
971817AH1-426 GEN
50/50
7.498
238114M24_2
Solar/Wind Harmer
4.934
238115M24_BAT
50/50
4.242
960201AF2-311 GEN
Solar/Wind Harmer
6.384
23751101LEADS_P59
Solar/Wind Helper
1.719
235780M24_1
Solar/Wind Harmer
5.658
237033AB1-150 GEN
Solar/Wind Harmer
3.13
960251AF2-316 GEN
Solar/Wind Harmer
9.575
CPLELTFEXP_CPLE->PJM
CLTF
0.264
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.175
LAGNLTFEXP_LAGN->PJM
CLTF
0.776
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.949
TVALTFEXP_TVA->PJM
CLTF
0.401
NYPJM->LTFIMP_NY
CLTF
0.178
LGEELTFEXP_LGEE->PJM
CLTF
0.282
WECLTFEXP_WEC->PJM
CLTF
0.138
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.457
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.845
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.511
MECLTFEXP_MEC->PJM
CLTF
0.621
SIGELTFEXP_SIGE->PJM
CLTF
0.021

Details for 01SUTT T-01SUTTON 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-016_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01SUTT T-01SUTTON 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-016_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.64 %
Rating:106.0 MVA
Rating Type:B
MVA to Mitigate:110.92
MW Contribution:3.66
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
3.662
971063AG2-658 GEN
Solar/Wind Harmer
16.281
971817AH1-426 GEN
50/50
7.323
238114M24_2
Solar/Wind Harmer
4.82
238115M24_BAT
50/50
4.144
960201AF2-311 GEN
Solar/Wind Harmer
6.235
23751101LEADS_P59
Solar/Wind Helper
1.359
235780M24_1
Solar/Wind Harmer
5.527
237033AB1-150 GEN
Solar/Wind Harmer
3.058
960251AF2-316 GEN
Solar/Wind Harmer
9.352
CPLELTFEXP_CPLE->PJM
CLTF
0.255
CBM West 2LTFEXP_CBM-W2->PJM
CBM
4.991
LAGNLTFEXP_LAGN->PJM
CLTF
0.749
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.917
TVALTFEXP_TVA->PJM
CLTF
0.387
NYPJM->LTFIMP_NY
CLTF
0.172
LGEELTFEXP_LGEE->PJM
CLTF
0.272
WECLTFEXP_WEC->PJM
CLTF
0.132
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.422
CBM West 1LTFEXP_CBM-W1->PJM
CBM
4.659
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.459
MECLTFEXP_MEC->PJM
CLTF
0.599
SIGELTFEXP_SIGE->PJM
CLTF
0.02

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-048_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-048_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.84 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:138.04
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-035_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-035_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:107.84 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:138.03
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-4_MP-138-102_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-4_MP-138-102_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.72 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:137.88
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P1-2_MP-138-049_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_MP-138-049_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.59 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:137.71
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-2_MP-138-034_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-2_MP-138-034_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:107.58 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:137.7
MW Contribution:4.33
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.331
971063AG2-658 GEN
Solar/Wind Harmer
19.255
971817AH1-426 GEN
50/50
8.662
971061AG2-657 GEN
Solar/Wind Harmer
2.482
238114M24_2
Solar/Wind Harmer
5.701
238115M24_BAT
50/50
4.901
960201AF2-311 GEN
Solar/Wind Harmer
7.375
23751101LEADS_P59
Solar/Wind Helper
1.861
235780M24_1
Solar/Wind Harmer
6.537
237033AB1-150 GEN
Solar/Wind Harmer
3.616
960251AF2-316 GEN
Solar/Wind Harmer
11.062
CPLELTFEXP_CPLE->PJM
CLTF
0.305
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.969
LAGNLTFEXP_LAGN->PJM
CLTF
0.895
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.095
TVALTFEXP_TVA->PJM
CLTF
0.462
NYPJM->LTFIMP_NY
CLTF
0.206
LGEELTFEXP_LGEE->PJM
CLTF
0.326
WECLTFEXP_WEC->PJM
CLTF
0.159
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.689
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.583
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.743
MECLTFEXP_MEC->PJM
CLTF
0.716
SIGELTFEXP_SIGE->PJM
CLTF
0.024

Details for 01WOLFRN-01SUTT T 138.0 kV Ckt 1 line l/o AP_P2-3_MP-138-018_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_MP-138-018_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:103.02 %
Rating:128.0 MVA
Rating Type:B
MVA to Mitigate:131.86
MW Contribution:4.25
Bus #Bus NameTypeMW Contribution
971819AH1-426A GEN
50/50
4.248
971063AG2-658 GEN
Solar/Wind Harmer
18.886
971817AH1-426 GEN
50/50
8.495
238114M24_2
Solar/Wind Harmer
5.591
238115M24_BAT
50/50
4.807
960201AF2-311 GEN
Solar/Wind Harmer
7.233
23751101LEADS_P59
Solar/Wind Helper
1.517
235780M24_1
Solar/Wind Harmer
6.411
237033AB1-150 GEN
Solar/Wind Harmer
3.547
960251AF2-316 GEN
Solar/Wind Harmer
10.849
CPLELTFEXP_CPLE->PJM
CLTF
0.296
CBM West 2LTFEXP_CBM-W2->PJM
CBM
5.794
LAGNLTFEXP_LAGN->PJM
CLTF
0.869
CBM South 2LTFEXP_CBM-S2->PJM
CBM
1.065
TVALTFEXP_TVA->PJM
CLTF
0.449
NYPJM->LTFIMP_NY
CLTF
0.2
LGEELTFEXP_LGEE->PJM
CLTF
0.316
WECLTFEXP_WEC->PJM
CLTF
0.154
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
1.655
CBM West 1LTFEXP_CBM-W1->PJM
CBM
5.406
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.693
MECLTFEXP_MEC->PJM
CLTF
0.695
SIGELTFEXP_SIGE->PJM
CLTF
0.023
CONTINGENCY 'AP_P1-2_MP-138-048_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235316 CKT 1   /*01BACKFK     138.0 - 01COWEN      138.0
END
CONTINGENCY 'AP_P2-2_MP-138-035_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235316 CKT 1   /*01BACKFK     138.0 - 01COWEN      138.0
END
CONTINGENCY 'AP_P2-4_MP-138-102_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235316 CKT 1   /*01BACKFK     138.0 - 01COWEN      138.0
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235387 CKT 1   /*01BACKFK     138.0 - 01PICKEN     138.0
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 236955 CKT 1   /*01BACKFK     138.0 - 01BACK FRK    23.0
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 236955 CKT 2   /*01BACKFK     138.0 - 01BACK FRK    23.0
END
CONTINGENCY 'AP_P1-2_MP-138-049_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235387 CKT 1   /*01BACKFK     138.0 - 01PICKEN     138.0
END
CONTINGENCY 'AP_P2-2_MP-138-034_SRT-A'
 DISCONNECT BRANCH FROM BUS 235295 TO BUS 235387 CKT 1   /*01BACKFK     138.0 - 01PICKEN     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-016_SRT-A'
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235295 CKT 1   /*01PICKEN     138.0 - 01BACKFK     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235332 CKT 1   /*01PICKEN     138.0 - 01FRNCHC     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235373 CKT 1   /*01PICKEN     138.0 - 01MONTRV     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235441 CKT 1   /*01PICKEN     138.0 - 01DURB T     138.0
END
CONTINGENCY 'AP_P2-3_MP-138-018_SRT-A'
 DISCONNECT BRANCH FROM BUS 235360 TO BUS 235373 CKT 1   /*01LINWD      138.0 - 01MONTRV     138.0
 DISCONNECT BRANCH FROM BUS 235360 TO BUS 237243 CKT 1   /*01LINWD      138.0 - 01LINWOOD     66.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235295 CKT 1   /*01PICKEN     138.0 - 01BACKFK     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235332 CKT 1   /*01PICKEN     138.0 - 01FRNCHC     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235373 CKT 1   /*01PICKEN     138.0 - 01MONTRV     138.0
 DISCONNECT BRANCH FROM BUS 235387 TO BUS 235441 CKT 1   /*01PICKEN     138.0 - 01DURB T     138.0
 DISCONNECT BRANCH FROM BUS 237198 TO BUS 235360 CKT 2   /*01LINWOOD     34.5 - 01LINWD      138.0
END
235296 to 235431 ckt 1
235389 to 235296 ckt 1
235437 to 235411 ckt 1
235431 to 235437 ckt 1

Short Circuit Analysis

Short Circuit analysis is not performed as part of the Phase I System Impact Study. Short Circuit analysis will commence in the Phase II System Impact Study.

Stability Analysis

Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.

Reactive Power Analysis

Reactive Power analysis is not performed as part of the Phase I System Impact Study. Reactive Power analysis will commence in the Phase II System Impact Study.

Steady-State Voltage Analysis

Steady State Voltage analysis is not performed as part of the Phase I System Impact Study. Steady State Voltage analysis will commence in the Phase II System Impact Study.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AB1-150Grassy Falls 138kVIn Service
AB1-180Pine View 12kVIn Service
AF2-311Gilboa-Jones Branch 138 kVEngineering & Procurement
AF2-316Gilboa-Jones Branch 138 kV IIEngineering & Procurement
AG2-657Kanawha River - Carbondale 138 kVActive
AG2-658Cowen 138 kVActive
AH1-426Gilboa-Jones Branch 138 kV IVActive

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with potential Affected System impacts. PJM initiates coordination with each Affected System Operator by providing a list of New Service Requests in the Cycle with potential impacts to their respective system. If the Affected System Operator indicates an Affected System Study is required, PJM will notify the Project Developer or Eligible Customer of the need for an Affected System Study. See below if any Affected System Operator requires a study for this project:

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Phase I analysis results, this project may have a cost responsibility for the following System Reinforcements:

AH1-426A System Reinforcements:
TORTEP IDTitleAllocated Cost ($USD)
APS(Pending) / TC2-APS-010Reconductor French Creek - Heaters 138kV transmission line$9,508,708
APSn7518Reconductor (Possible Rebuild) ~4.6 miles of Crupperneck-Grassy Falls 138kV line including T-Line drops at Crupperneck$5,750,435
APSn9160.0 / TC1-PH1-077Reconductor Powell Mountain - Bays 138 kV Line$3,830,313
APS(Pending) / TC2-APS-032.bReconductor (possible rebuild) ~16.5miles Back Fork - Pickens 138 kV$2,798,821
APS(Pending) / TC1-PH1-099Reconductor Sutton Hill - Heater 138 kV Line, Terminal upgrades at Sutton Hill$2,640,689
APS(Pending) / TC1-PH1-005Bays - Wolf Run 138 kV line to be reconductored with 795 ACSR.$1,739,021
APS(Pending) / TC1-PH1-010Reconductor Wolf Run - Sutton Tap 138 kV line$1,515,727
APS(Pending) / TC1-PH1-004Rebuild ~21.7 miles on Back Fork-Crupperneck 138 kV Line$1,121,095
APS(Pending) / TC1-PH1-011Reconductor Sutton Hill - Sutton Tap 138 kV,$859,215
APS(Pending) / TC2-APS-027Upgrade/Replace 138 kV West Bus + Risers at Powell Mt.$175,895
APS(Pending) / TC2-APS-005Upgrade Wave Trap at Gilboa$100,742
APS(Pending) / TC2-APS-032.aUpgrade/Replace Wave Trap at Pickens$18,402
APS(Pending) / TC2-APS-032.cUpgrade/Replace shared node at Back Fork$13,284
Grand Total:$30,072,347

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-010
Title
Reconductor French Creek - Heaters 138kV transmission line
Description
Reconductor (Possible Rebuild) ~30.6 miles of French Creek - Heaters transmission line
Total Cost ($USD)
$94,637,673
Allocated Cost ($USD)
$9,508,708
Time Estimate
47 Months

Contributor

FacilityContingency
01FRNCHC-01HEATER 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
26.0 MW69.9%$66,111,548
AH1-426
7.5 MW20.1%$19,017,417
AH1-426A
3.7 MW10.0%$9,508,708

System Reinforcement: n7518
Type
Load Flow
TO
APS
RTEP ID / TO ID
n7518
Title
Reconductor (Possible Rebuild) ~4.6 miles of Crupperneck-Grassy Falls 138kV line including T-Line drops at Crupperneck
Description
Reconductor (Possible Rebuild) ~4.6 miles of Crupperneck-Grassy Falls 138kV line including T-Line drops at Crupperneck
Total Cost ($USD)
$17,251,304
Allocated Cost ($USD)
$5,750,435
Time Estimate
19 Months

Contributor

FacilityContingency
01CRUPRN-01NETTIE 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AH1-426
9.6 MW66.7%$11,500,869
AH1-426A
4.8 MW33.3%$5,750,435

System Reinforcement: n9160.0
Type
Load Flow
TO
APS
RTEP ID / TO ID
n9160.0 / TC1-PH1-077
Title
Reconductor Powell Mountain - Bays 138 kV Line
Description
Reconductoring the line with 795 ACSR conductor. The Powell Mountain - Bays 138 kV is 11.3 miles in length.
Total Cost ($USD)
$38,094,411
Allocated Cost ($USD)
$3,830,313
Time Estimate
31 Months

Contributor

FacilityContingency
01BAYS-01POWELM 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
30.1 MW69.8%$26,603,473
AH1-426
8.7 MW20.1%$7,660,626
AH1-426A
4.3 MW10.1%$3,830,313

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-032.b
Title
Reconductor (possible rebuild) ~16.5miles Back Fork - Pickens 138 kV
Description
Reconductor (possible rebuild) ~16.5miles Back Fork - Pickens 138 kV
Total Cost ($USD)
$55,447,998
Allocated Cost ($USD)
$2,798,821
Time Estimate
38 Months

Contributor

FacilityContingency
01BACKFK-01PICKEN 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
85.6 MW84.9%$47,052,085
AH1-426
10.2 MW10.1%$5,597,092
AH1-426A
5.1 MW5.0%$2,798,821

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC1-PH1-099
Title
Reconductor Sutton Hill - Heater 138 kV Line, Terminal upgrades at Sutton Hill
Description
Reconductor 7.5 miles of the existing T line conductor with 795 ACSR conductor.
Total Cost ($USD)
$26,282,083
Allocated Cost ($USD)
$2,640,689
Time Estimate
26 Months

Contributor

FacilityContingency
01HEATER-01SUTTON 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
26.0 MW69.9%$18,360,016
AH1-426
7.5 MW20.1%$5,281,378
AH1-426A
3.7 MW10.0%$2,640,689

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC1-PH1-005
Title
Bays - Wolf Run 138 kV line to be reconductored with 795 ACSR.
Description
4.4 mile line to be reconductored with 795 ACSR.
Total Cost ($USD)
$17,295,451
Allocated Cost ($USD)
$1,739,021
Time Estimate
19 Months

Contributor

FacilityContingency
01BAYS-01WOLFRN 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
30.1 MW69.8%$12,078,387
AH1-426
8.7 MW20.1%$3,478,042
AH1-426A
4.3 MW10.1%$1,739,021

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC1-PH1-010
Title
Reconductor Wolf Run - Sutton Tap 138 kV line
Description
4.1 mile line to be reconductored with 795 ACSR.
Total Cost ($USD)
$15,074,673
Allocated Cost ($USD)
$1,515,727
Time Estimate
19 Months

Contributor

FacilityContingency
01WOLFRN-01SUTT T 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
30.1 MW69.8%$10,527,493
AH1-426
8.7 MW20.1%$3,031,453
AH1-426A
4.3 MW10.1%$1,515,727

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC1-PH1-004
Title
Rebuild ~21.7 miles on Back Fork-Crupperneck 138 kV Line
Description
Rebuild ~21.7 miles on Back Fork-Crupperneck 138 kV Line
Total Cost ($USD)
$68,463,650
Allocated Cost ($USD)
$1,121,095
Time Estimate
38 Months

Contributor

FacilityContingency
01BACKFK-01COWEN 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
295.6 MW95.1%$65,100,586
AH1-426
10.2 MW3.3%$2,241,969
AH1-426A
5.1 MW1.6%$1,121,095

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC1-PH1-011
Title
Reconductor Sutton Hill - Sutton Tap 138 kV,
Description
Reconductor (possible rebuild) ~2.3 miles of the Sutton Hill - Sutton Tap 138 kV transmission line using one (1) 795 26/7 "Drake ACSR
Total Cost ($USD)
$8,545,167
Allocated Cost ($USD)
$859,215
Time Estimate
18 Months

Contributor

FacilityContingency
01SUTTON-01SUTT T 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
26.0 MW69.8%$5,967,522
AH1-426
7.5 MW20.1%$1,718,430
AH1-426A
3.7 MW10.1%$859,215

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-027
Title
Upgrade/Replace 138 kV West Bus + Risers at Powell Mt.
Description
Upgrade/Replace 138 kV West Bus + Risers at Powell Mt.
Total Cost ($USD)
$645,868
Allocated Cost ($USD)
$175,895
Time Estimate
12 Months

Contributor

FacilityContingency
01ENONTP-01POWELM 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-657
9.0 MW18.3%$118,169
AH1-426
26.9 MW54.5%$351,804
AH1-426A
13.5 MW27.2%$175,895

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-005
Title
Upgrade Wave Trap at Gilboa
Description
Upgrade 1200 A L1200 Wave Trap for Gilboa - Jones Branch 138 kV line at Gilboa
Total Cost ($USD)
$364,562
Allocated Cost ($USD)
$100,742
Time Estimate
19 Months

Contributor

FacilityContingency
01GILBOA-AF2-311 TP 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-657
10.0 MW17.1%$62,330
AH1-426
32.5 MW55.3%$201,490
AH1-426A
16.2 MW27.6%$100,742

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-032.a
Title
Upgrade/Replace Wave Trap at Pickens
Description
Upgrade/Replace Wave Trap at Pickens
Total Cost ($USD)
$364,562
Allocated Cost ($USD)
$18,402
Time Estimate
17 Months

Contributor

FacilityContingency
01BACKFK-01PICKEN 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
85.6 MW84.9%$309,360
AH1-426
10.2 MW10.1%$36,800
AH1-426A
5.1 MW5.0%$18,402

System Reinforcement
Type
Load Flow
TO
APS
RTEP ID / TO ID
(Pending) / TC2-APS-032.c
Title
Upgrade/Replace shared node at Back Fork
Description
Upgrade/Replace shared node at Back Fork
Total Cost ($USD)
$263,169
Allocated Cost ($USD)
$13,284
Time Estimate
12 Months

Contributor

FacilityContingency
01BACKFK-01PICKEN 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AG2-658
85.6 MW84.9%$223,320
AH1-426
10.2 MW10.1%$26,565
AH1-426A
5.1 MW5.0%$13,284

System Reinforcement: s3493.1
Type
Load Flow
TO
APS
RTEP ID / TO ID
s3493.1 / APS-2024-051
Title
Terminal Equipment Upgrades at Crupperneck, Cowen, and Back Fork 138kV substations (Projected ISD 6/30/2027)
Description
At Crupperneck, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying. At Cowen, replace disconnect switches. At Back Fork, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying.
Cost Information
Time Estimate
Jul 30 2027

Contingent

Note: Although AH1-426A may not presently have cost responsibility for this upgrade, AH1-426A may need this upgrade in-service to be deliverable to the PJM system. If AH1-426A desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
01BACKFK-01COWEN 138.0 kV Ckt 1 line(Any)
          New AF2-311 138kV swyd - APS: This project's cost allocation eligibility was based on the grouped impact of all New Service Requests which shared this POI within this cycle. 
          
          The following projects shared this POI:
          AH1-426, AH1-426A
        

Attachments

AH1-426A One Line Diagram

AH1-426A One Line Diagram.pdf
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.