AH1-564 Phase I Study Report

v1.00 released 2025-10-29 21:46

Rockford II 138 kV

150.0 MW Capacity / 150.0 MW Energy

Introduction

This Phase I System Impact Study Report (PH1) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, sections 307 and 308 for New Service Requests (projects) in Transition Cycle 2. The Project Developer/Eligible Customer (developer) is Rockford Generation, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Commonwealth Edison Company.

Preface

The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
  1. PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
  2. PJM will only perform load flow analysis during the Phase I System Impact Study.
  3. In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with Affected System impacts and provides each Affected System Operator with a list of New Service Request in the Cycle with potential impacts to their respective system.
  4. PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
  5. The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase I System Impact Study:
  1. Identify required Interconnection Facilities to accommodate the New Service Request.
  2. Identify required Network Upgrades to mitigate system violations from the Phase I System Impact Study.
  3. Provide planning-level preliminary estimates of Interconnection Facilities and Network Upgrades including scope, cost and elapsed time to complete the work.

Decision Point I Requirements

At the close of Phase I System Impact Study, PJM will initiate Decision Point I (DP1). During DP1, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.A.1. Additional information on these elements is available in PJM Manual 14H sections 4.4, 6, and 7.

Allowable project modifications at Decision Point I are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

General

The Project Developer has proposed an uprate to a planned/existing Natural Gas facility located in the Commonwealth Edison Company zone — Winnebago County, Illinois. This project is an increase to the developer’s AC1-114/AC2-116 project(s), which will share the same Point of Interconnection. The AH1-564 project is a 150.0 MW uprate (150.0 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 330.0 MW with 177.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AH1-564
Project Name:
Rockford II 138 kV
Project Developer Name:
Rockford Generation, LLC
State:
Illinois
County:
Winnebago
Transmission Owner:
Commonwealth Edison Company
MFO:
330.0
MWE:
150.0
MWC:
150.0
Battery Storage Specification:
600.0 MWh, 4.0-hr class
Grid Charging:
Yes
Fuel Type:
Storage
Basecase Study Year:
2028

Physical Interconnection Facility Study

Physical Interconnection Facilities Study is not performed as part of the Phase I System Impact Study. Physical Interconnection Facilities Study will commence in the Phase II System Impact Study.

Point of Interconnection

AH1-564 will interconnect on the Commonwealth Edison Company  transmission system at the Rockford II 138 kV Substation.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In the Phase I SIS, the costs shown are subject to change as a result of a facility study performed by the TO during the Phase II or Phase III System Impact Study.

Based on the Phase I SIS results, the AH1-564 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit are also shown below.

Cost Summary
DescriptionCost Allocated to AH1-564Cost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF)$0$0
Other Scope$350,000$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0
Network Upgrades$0$0
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$500,000$500,000
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$0$0
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$850,000$500,000

* Contributes to calculation for Readiness Deposit #2 (RD2). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 309 (Decision Point I) A.1.a.i and PJM Manual 14H, section 6.2, Readiness Deposit #2 (RD2) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point I (DP1), the Project Developer or Eligible Customer is required to submit Readiness Deposit #2, which is calculated as 10% of cost allocation for required Phase I Network Upgrades minus Readiness Deposit #1.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Readiness Deposit #2 Due for Project AH1-564

Readiness Deposit #2 has been calculated for the project based on the Phase I System Impact Study results and is shown in the table below. This Readiness Deposit #2 must be provided at Decision Point I through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID10% of cost allocation for Phase I Network UpgradesReadiness Deposit #1 Received (RD1)Readiness Deposit #2 (RD2) for AH1-564 Project due at DP1
ABA - B
AH1-564$50,000$600,000$0

Note: Failure to provide an acceptable form of Readiness Deposit #2 by the end of Decision Point I will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

If your project relies on Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and/or Network Upgrades that will be constructed by another New Service Request and the other New Service Request withdraws, the scope and costs will be allocated to your project, unless the Transmission Owner Interconnection Facilities, Stand Alone Network Upgrades, and/or applicable Network Upgrades have been securitized in an ISA/GIA. 

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Physical Interconnection
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)SCADA, Relay and Comm' review/updates.$350,000 $350,000

Based on the scope of work for the Interconnection Facilities, it is expected to take a range of 12 to 15 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.

Notes on Cost Estimate:

  1. These estimates are order-of-magnitude estimates of the costs that ComEd would bill to the Project Developer for this interconnection. These estimates are based on a one-line electrical diagram of the project and the information provided by the Project Developer.
  2. There were no site visits performed for these estimates. There may be costs related to specific site related issues that are not identified in these estimates. The site reviews will be performed during the Facilities Study or during detailed engineering.
  3. These estimates are not a guarantee of the maximum amount payable by the Project Developer and the actual costs of ComEd's work may differ significantly from these estimates. The Project Developer will be responsible for paying actual costs of ComEd's work in accordance with the PJM Open Access Transmission Tariff.
  4. The Project Developer is responsible for all engineering, procurement, testing and construction of all equipment on the Project Developer’s side of the Point of Change in Ownership.

 

 

Transmission Owner Analysis

No Transmission Owner impacts identified.

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. ComEd interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AH1-564 was evaluated as a 150.0 MW (150.0 MW Capacity) injection in the ComEd area.

AH1-564 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 330.0 MW (150.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2CE
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
COMED_P4_144-45-BT7-8___SRT-A
BreakerAC121.54 %1568.0STE1905.6736.78
GD2CE
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
COMED_P4_144-45-BT5-8___SRT-A
BreakerAC121.25 %1568.0STE1901.1336.36
GD2CE
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
COMED_P4-6_006-345-BT78___SRT-A
BreakerAC114.6 %1568.0STE1796.9437.92
GD2CE
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
COMED_P2-2_111_EJ-345B__1_SRT-A
BusAC108.49 %1568.0STE1701.1131.11
GD2CE
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
COMED_P4_111-45-L11124__SRT-A
BreakerAC108.48 %1568.0STE1701.0131.11
GD2CE
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
COMED_P4_111-45-TR81____SRT-A
BreakerAC108.48 %1568.0STE1701.0131.11
GD2CE
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
COMED_P1-2_345-L92805__B-R_SRT-A-2
SingleAC107.3 %1568.0STE1682.4336.73
GD2CE
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
COMED_P1-2_345-L0626__B-R_SRT-A
SingleAC103.44 %1568.0STE1621.9236.73
GD2CE
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Base Case
SingleAC100.38 %1201.0A1205.5729.3
GD2CE
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
COMED_P4_144-45-BT7-8___SRT-A
BreakerAC117.47 %1568.0STE1841.9536.78
GD2CE
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
COMED_P4_144-45-BT5-8___SRT-A
BreakerAC117.23 %1568.0STE1838.1136.36
GD2CE
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
COMED_P4-6_006-345-BT78___SRT-A
BreakerAC110.49 %1568.0STE1732.5437.92
GD2CE
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
COMED_P2-2_111_EJ-345B__1_SRT-A
BusAC104.67 %1568.0STE1641.1531.11
GD2CE
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
COMED_P4_111-45-TR81____SRT-A
BreakerAC104.66 %1568.0STE1641.0531.11
GD2CE
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
COMED_P4_111-45-L11124__SRT-A
BreakerAC104.66 %1568.0STE1641.0531.11
GD2CE
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
COMED_P1-2_345-L92805__B-R_SRT-A-2
SingleAC104.46 %1568.0STE1638.036.73
GD2CE
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
COMED_P1-2_345-L0626__B-R_SRT-A
SingleAC100.61 %1568.0STE1577.4936.73
IPDCE
ROCKFORD ;RP-SABROOKE ; R 138.0 kV Ckt 1 line
Base Case
SingleAC104.08 %310.0A322.64150.0
GD2CE
ROCKFORD ;RP-SABROOKE ; R 138.0 kV Ckt 1 line
Base Case
SingleAC104.06 %310.0A322.6150.0

Details for AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P4_144-45-BT7-8___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_144-45-BT7-8___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:121.54 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1905.67
MW Contribution:36.78
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
43.598
971411AH1-196 GEN
Solar/Wind Harmer
63.72
946321AF1-296 GEN
Solar/Wind Harmer
9.234
971675AH1-338 GEN
Solar/Wind Harmer
14.566
971171AH1-044 GEN
Solar/Wind Harmer
10.168
972235AH1-702 GEN1
50/50
5.799
274857EASY ROAD;U1
Solar/Wind Harmer
7.248
274766LEE CO EC;7U
Adder
13.905
962781AG1-127 GEN
Solar/Wind Harmer
7.125
276612AE2-035 GEN
Solar/Wind Harmer
4.629
971681AH1-341 GEN
Solar/Wind Harmer
21.411
971177AH1-047 GEN
Solar/Wind Harmer
4.41
274657BYRON ;2U
50/50
15.925
972031AH1-564 GEN
50/50
36.781
274761LEE CO EC;2U
Adder
14.071
276158O29GEN2
Solar/Wind Harmer
4.543
276861AD2-134 GEN
Solar/Wind Harmer
1.453
971335AH1-147 GEN
Solar/Wind Harmer
43.356
274764LEE CO EC;5U
Adder
14.104
972267AH1-718 GEN
Adder
4.503
276708O09 GEN2
Solar/Wind Harmer
3.245
970921AG2-575 GEN
Solar/Wind Harmer
7.492
970921AG2-575 GEN
Solar/Wind Harmer
1.742
274824ROCKFORD ;12
50/50
34.076
274822ROCKFORD ;11
50/50
43.914
971475AH1-234 GEN
Solar/Wind Harmer
44.028
970819AG2-516 GEN
Solar/Wind Harmer
23.26
274872LEEDK;1U
Solar/Wind Harmer
5.679
959081AF2-199 GEN
Solar/Wind Harmer
5.084
971067AG2-660 GEN
Solar/Wind Harmer
1.182
274856ECOGROVE ;U1
Solar/Wind Harmer
6.101
276611AD2-172 GEN
Solar/Wind Harmer
4.629
274762LEE CO EC;3U
Adder
14.071
938861AE1-114 GEN
Solar/Wind Harmer
12.173
276603SUBLETTE C
Solar/Wind Harmer
1.211
962691AG1-118 GEN
Solar/Wind Harmer
17.893
971333AH1-146 GEN
Solar/Wind Harmer
43.356
274765LEE CO EC;6U
Adder
14.104
274763LEE CO EC;4U
Adder
13.938
942991AE2-321 GEN
Solar/Wind Harmer
6.762
972236AH1-702 GEN2
50/50
5.049
274656BYRON ;1U
50/50
16.311
274760LEE CO EC;1U
Adder
14.071
965931AG1-462 GEN
Solar/Wind Harmer
21.908
274872LEEDK;1U
Solar/Wind Harmer
0.177
274858EASY ROAD;U2
Solar/Wind Harmer
7.248
276157O29GEN1
Solar/Wind Harmer
3.455
274850MENDOTA H;RU
Solar/Wind Harmer
2.09
276602WESTBROOK C
Solar/Wind Harmer
1.73
276863AD2-134 GEN
Solar/Wind Harmer
1.453
276799AD1-013 GEN
Solar/Wind Harmer
1.777
946671AF1-331 GEN
Solar/Wind Harmer
0.336
274855GSG-6 ;RU
Solar/Wind Harmer
3.005
961011AF2-392 GEN
Solar/Wind Harmer
11.886
960751AF2-366 GEN
Solar/Wind Harmer
2.149
957471AF2-041 GEN
Solar/Wind Harmer
15.252
276741O09 GEN1
Solar/Wind Harmer
3.245
971341AH1-150 GEN
Solar/Wind Harmer
10.168
971343AH1-151 GEN
Solar/Wind Harmer
10.168
274767LEE CO EC;8U
Adder
13.905
959091AF2-200 GEN
Solar/Wind Harmer
10.168
990407J1304
External Queue
7.996669292449951
990512J1326
External Queue
9.444316864013672
991092J1477
External Queue
2.8638265132904053
991777J1629 G
External Queue
9.207619667053223
990117J1214
External Queue
32.48844909667969
990727J1377 G
External Queue
13.982793807983398
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.914
TVALTFEXP_TVA->PJM
CLTF
0.659
LAGNLTFEXP_LAGN->PJM
CLTF
2.566
CBM West 1LTFEXP_CBM-W1->PJM
CBM
44.811
NYPJM->LTFIMP_NY
CLTF
0.236
MECLTFEXP_MEC->PJM
CLTF
9.246
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.21
WECLTFEXP_WEC->PJM
CLTF
0.762
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.412
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.176
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002

Details for AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P4_144-45-BT5-8___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_144-45-BT5-8___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:121.25 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1901.13
MW Contribution:36.36
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
43.098
971411AH1-196 GEN
Solar/Wind Harmer
63.022
946321AF1-296 GEN
Solar/Wind Harmer
9.259
971675AH1-338 GEN
Solar/Wind Harmer
14.702
971171AH1-044 GEN
Solar/Wind Harmer
10.904
972235AH1-702 GEN1
50/50
5.749
274857EASY ROAD;U1
Solar/Wind Harmer
7.229
274766LEE CO EC;7U
Adder
13.869
962781AG1-127 GEN
Solar/Wind Harmer
7.206
276612AE2-035 GEN
Solar/Wind Harmer
4.588
971681AH1-341 GEN
Solar/Wind Harmer
21.331
971177AH1-047 GEN
Solar/Wind Harmer
4.205
274657BYRON ;2U
50/50
15.786
972031AH1-564 GEN
50/50
36.36
274761LEE CO EC;2U
Adder
14.034
276158O29GEN2
Solar/Wind Harmer
4.561
276861AD2-134 GEN
Solar/Wind Harmer
1.467
971335AH1-147 GEN
Solar/Wind Harmer
42.977
274764LEE CO EC;5U
Adder
14.067
972267AH1-718 GEN
Adder
4.528
276708O09 GEN2
Solar/Wind Harmer
3.258
970921AG2-575 GEN
Solar/Wind Harmer
7.577
970921AG2-575 GEN
Solar/Wind Harmer
1.762
274824ROCKFORD ;12
50/50
33.686
274822ROCKFORD ;11
50/50
43.411
971475AH1-234 GEN
Solar/Wind Harmer
43.586
970819AG2-516 GEN
Solar/Wind Harmer
23.028
274872LEEDK;1U
Solar/Wind Harmer
5.758
959081AF2-199 GEN
Solar/Wind Harmer
5.452
971067AG2-660 GEN
Solar/Wind Harmer
1.268
274856ECOGROVE ;U1
Solar/Wind Harmer
6.047
276611AD2-172 GEN
Solar/Wind Harmer
4.588
274762LEE CO EC;3U
Adder
14.034
938861AE1-114 GEN
Solar/Wind Harmer
12.113
276603SUBLETTE C
Solar/Wind Harmer
1.212
962691AG1-118 GEN
Solar/Wind Harmer
18.291
971333AH1-146 GEN
Solar/Wind Harmer
42.977
274765LEE CO EC;6U
Adder
14.067
274763LEE CO EC;4U
Adder
13.902
942991AE2-321 GEN
Solar/Wind Harmer
6.399
972236AH1-702 GEN2
50/50
5.005
274656BYRON ;1U
50/50
16.168
274760LEE CO EC;1U
Adder
14.034
965931AG1-462 GEN
Solar/Wind Harmer
21.979
274872LEEDK;1U
Solar/Wind Harmer
0.179
274858EASY ROAD;U2
Solar/Wind Harmer
7.229
276157O29GEN1
Solar/Wind Harmer
3.469
274850MENDOTA H;RU
Solar/Wind Harmer
2.109
276602WESTBROOK C
Solar/Wind Harmer
1.746
276863AD2-134 GEN
Solar/Wind Harmer
1.467
276799AD1-013 GEN
Solar/Wind Harmer
1.794
946671AF1-331 GEN
Solar/Wind Harmer
0.34
274855GSG-6 ;RU
Solar/Wind Harmer
3.033
961011AF2-392 GEN
Solar/Wind Harmer
11.925
960751AF2-366 GEN
Solar/Wind Harmer
2.174
957471AF2-041 GEN
Solar/Wind Harmer
16.357
276741O09 GEN1
Solar/Wind Harmer
3.258
971341AH1-150 GEN
Solar/Wind Harmer
10.904
971343AH1-151 GEN
Solar/Wind Harmer
10.904
274767LEE CO EC;8U
Adder
13.869
959091AF2-200 GEN
Solar/Wind Harmer
10.904
990407J1304
External Queue
7.907464027404785
990512J1326
External Queue
9.342920303344727
991092J1477
External Queue
2.8840813636779785
991777J1629 G
External Queue
9.058588027954102
990117J1214
External Queue
32.139644622802734
990727J1377 G
External Queue
13.837535858154297
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.907
TVALTFEXP_TVA->PJM
CLTF
0.656
LAGNLTFEXP_LAGN->PJM
CLTF
2.557
CBM West 1LTFEXP_CBM-W1->PJM
CBM
44.389
NYPJM->LTFIMP_NY
CLTF
0.235
MECLTFEXP_MEC->PJM
CLTF
9.219
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.158
WECLTFEXP_WEC->PJM
CLTF
0.729
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.411
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.176
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002

Details for AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P4-6_006-345-BT78___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4-6_006-345-BT78___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:114.6 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1796.94
MW Contribution:37.92
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
44.943
971411AH1-196 GEN
Solar/Wind Harmer
64.395
946321AF1-296 GEN
Solar/Wind Harmer
8.796
971675AH1-338 GEN
Solar/Wind Harmer
14.414
971171AH1-044 GEN
Solar/Wind Harmer
9.367
276612AE2-035 GEN
Solar/Wind Harmer
4.752
971681AH1-341 GEN
Solar/Wind Harmer
21.179
971177AH1-047 GEN
Solar/Wind Harmer
4.62
274657BYRON ;2U
50/50
17.85
972031AH1-564 GEN
50/50
37.916
274761LEE CO EC;2U
Adder
12.907
276158O29GEN2
Solar/Wind Harmer
4.286
276861AD2-134 GEN
Solar/Wind Harmer
1.438
972235AH1-702 GEN1
50/50
5.259
274857EASY ROAD;U1
Solar/Wind Harmer
6.648
274766LEE CO EC;7U
Adder
12.755
962781AG1-127 GEN
Solar/Wind Harmer
7.214
274764LEE CO EC;5U
Adder
12.937
972267AH1-718 GEN
Adder
4.193
276708O09 GEN2
Solar/Wind Harmer
3.061
970921AG2-575 GEN
Solar/Wind Harmer
7.585
970921AG2-575 GEN
Solar/Wind Harmer
1.764
274824ROCKFORD ;12
50/50
35.129
274822ROCKFORD ;11
50/50
45.271
971475AH1-234 GEN
Solar/Wind Harmer
46.897
970819AG2-516 GEN
Solar/Wind Harmer
24.195
274872LEEDK;1U
Solar/Wind Harmer
5.696
959081AF2-199 GEN
Solar/Wind Harmer
4.683
971067AG2-660 GEN
Solar/Wind Harmer
1.089
274856ECOGROVE ;U1
Solar/Wind Harmer
6.263
276611AD2-172 GEN
Solar/Wind Harmer
4.752
938861AE1-114 GEN
Solar/Wind Harmer
12.204
274762LEE CO EC;3U
Adder
12.907
276603SUBLETTE C
Solar/Wind Harmer
1.169
962691AG1-118 GEN
Solar/Wind Harmer
18.087
274765LEE CO EC;6U
Adder
12.937
274763LEE CO EC;4U
Adder
12.785
942991AE2-321 GEN
Solar/Wind Harmer
7.135
274858EASY ROAD;U2
Solar/Wind Harmer
6.648
276157O29GEN1
Solar/Wind Harmer
3.26
274850MENDOTA H;RU
Solar/Wind Harmer
2.067
276602WESTBROOK C
Solar/Wind Harmer
1.711
276863AD2-134 GEN
Solar/Wind Harmer
1.438
276799AD1-013 GEN
Solar/Wind Harmer
1.759
946671AF1-331 GEN
Solar/Wind Harmer
0.333
274855GSG-6 ;RU
Solar/Wind Harmer
2.973
961011AF2-392 GEN
Solar/Wind Harmer
11.275
960751AF2-366 GEN
Solar/Wind Harmer
2.176
957471AF2-041 GEN
Solar/Wind Harmer
14.05
276741O09 GEN1
Solar/Wind Harmer
3.061
971341AH1-150 GEN
Solar/Wind Harmer
9.367
971343AH1-151 GEN
Solar/Wind Harmer
9.367
274767LEE CO EC;8U
Adder
12.755
959091AF2-200 GEN
Solar/Wind Harmer
9.367
972236AH1-702 GEN2
50/50
5.659
274656BYRON ;1U
50/50
14.792
274760LEE CO EC;1U
Adder
12.907
965931AG1-462 GEN
Solar/Wind Harmer
20.756
274872LEEDK;1U
Solar/Wind Harmer
0.177
990407J1304
External Queue
8.578377723693848
990512J1326
External Queue
10.086955070495605
991092J1477
External Queue
2.650393486022949
991777J1629 G
External Queue
9.956707000732422
990117J1214
External Queue
34.69912338256836
990727J1377 G
External Queue
14.958372116088867
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.877
TVALTFEXP_TVA->PJM
CLTF
0.647
LAGNLTFEXP_LAGN->PJM
CLTF
2.531
CBM West 1LTFEXP_CBM-W1->PJM
CBM
46.123
NYPJM->LTFIMP_NY
CLTF
0.233
MECLTFEXP_MEC->PJM
CLTF
9.145
CBM West 2LTFEXP_CBM-W2->PJM
CBM
12.943
WECLTFEXP_WEC->PJM
CLTF
0.873
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.41
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.17
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002

Details for AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P2-2_111_EJ-345B__1_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P2-2_111_EJ-345B__1_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:108.49 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1701.11
MW Contribution:31.11
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
36.874
971411AH1-196 GEN
Solar/Wind Harmer
59.956
971171AH1-044 GEN
Solar/Wind Harmer
21.842
946321AF1-296 GEN
Solar/Wind Harmer
9.025
971675AH1-338 GEN
Solar/Wind Harmer
13.322
276612AE2-035 GEN
Solar/Wind Harmer
3.971
971681AH1-341 GEN
Solar/Wind Harmer
19.548
971177AH1-047 GEN
Solar/Wind Harmer
3.423
972235AH1-702 GEN1
50/50
4.364
274857EASY ROAD;U1
Solar/Wind Harmer
6.261
274766LEE CO EC;7U
Adder
12.012
962781AG1-127 GEN
Solar/Wind Harmer
6.242
274824ROCKFORD ;12
50/50
28.82
274822ROCKFORD ;11
50/50
37.14
970819AG2-516 GEN
Solar/Wind Harmer
19.524
971475AH1-234 GEN
Solar/Wind Harmer
35.705
972031AH1-564 GEN
50/50
31.109
274657BYRON ;2U
50/50
12.007
274761LEE CO EC;2U
Adder
12.155
276158O29GEN2
Solar/Wind Harmer
4.501
276861AD2-134 GEN
Solar/Wind Harmer
1.33
959081AF2-199 GEN
Solar/Wind Harmer
10.921
971067AG2-660 GEN
Solar/Wind Harmer
2.54
274872LEEDK;1U
Solar/Wind Harmer
5.07
274765LEE CO EC;6U
Adder
12.183
274763LEE CO EC;4U
Adder
12.04
971333AH1-146 GEN
Solar/Wind Harmer
20.489
942991AE2-321 GEN
Solar/Wind Harmer
5.127
274856ECOGROVE ;U1
Solar/Wind Harmer
5.234
276611AD2-172 GEN
Solar/Wind Harmer
3.971
938861AE1-114 GEN
Solar/Wind Harmer
10.904
274762LEE CO EC;3U
Adder
12.155
276603SUBLETTE C
Solar/Wind Harmer
1.154
962691AG1-118 GEN
Solar/Wind Harmer
15.751
274764LEE CO EC;5U
Adder
12.183
972267AH1-718 GEN
Adder
4.55
971335AH1-147 GEN
Solar/Wind Harmer
20.489
276708O09 GEN2
Solar/Wind Harmer
3.215
970921AG2-575 GEN
Solar/Wind Harmer
6.564
970921AG2-575 GEN
Solar/Wind Harmer
1.527
274855GSG-6 ;RU
Solar/Wind Harmer
2.751
961011AF2-392 GEN
Solar/Wind Harmer
11.668
957471AF2-041 GEN
Solar/Wind Harmer
32.763
960751AF2-366 GEN
Solar/Wind Harmer
1.883
971341AH1-150 GEN
Solar/Wind Harmer
21.842
971343AH1-151 GEN
Solar/Wind Harmer
21.842
276741O09 GEN1
Solar/Wind Harmer
3.215
274767LEE CO EC;8U
Adder
12.012
959091AF2-200 GEN
Solar/Wind Harmer
21.842
274858EASY ROAD;U2
Solar/Wind Harmer
6.261
276157O29GEN1
Solar/Wind Harmer
3.423
274850MENDOTA H;RU
Solar/Wind Harmer
1.913
276602WESTBROOK C
Solar/Wind Harmer
1.583
276863AD2-134 GEN
Solar/Wind Harmer
1.33
276799AD1-013 GEN
Solar/Wind Harmer
1.623
946671AF1-331 GEN
Solar/Wind Harmer
0.307
972236AH1-702 GEN2
50/50
3.807
274656BYRON ;1U
50/50
12.275
274760LEE CO EC;1U
Adder
12.155
965931AG1-462 GEN
Solar/Wind Harmer
21.597
274872LEEDK;1U
Solar/Wind Harmer
0.158
990407J1304
External Queue
6.372202396392822
990512J1326
External Queue
7.586848735809326
991092J1477
External Queue
2.9171924591064453
990117J1214
External Queue
26.098758697509766
990727J1377 G
External Queue
11.226364135742188
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.918
CPLELTFEXP_CPLE->PJM
CLTF
0.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.301
CBM West 1LTFEXP_CBM-W1->PJM
CBM
38.5
NYPJM->LTFIMP_NY
CLTF
0.196
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.109
SIGELTFEXP_SIGE->PJM
CLTF
0.004
CBM West 2LTFEXP_CBM-W2->PJM
CBM
12.803
WECLTFEXP_WEC->PJM
CLTF
0.471
MECLTFEXP_MEC->PJM
CLTF
8.533
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.275
TVALTFEXP_TVA->PJM
CLTF
0.648
LAGNLTFEXP_LAGN->PJM
CLTF
2.437

Details for AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P4_111-45-L11124__SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_111-45-L11124__SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.48 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1701.01
MW Contribution:31.11
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
36.874
971411AH1-196 GEN
Solar/Wind Harmer
59.956
971171AH1-044 GEN
Solar/Wind Harmer
21.842
946321AF1-296 GEN
Solar/Wind Harmer
9.025
971675AH1-338 GEN
Solar/Wind Harmer
13.322
276612AE2-035 GEN
Solar/Wind Harmer
3.971
971681AH1-341 GEN
Solar/Wind Harmer
19.548
971177AH1-047 GEN
Solar/Wind Harmer
3.423
972235AH1-702 GEN1
50/50
4.364
274857EASY ROAD;U1
Solar/Wind Harmer
6.261
274766LEE CO EC;7U
Adder
12.012
962781AG1-127 GEN
Solar/Wind Harmer
6.242
274764LEE CO EC;5U
Adder
12.183
274824ROCKFORD ;12
50/50
28.82
274822ROCKFORD ;11
50/50
37.14
970819AG2-516 GEN
Solar/Wind Harmer
19.524
971475AH1-234 GEN
Solar/Wind Harmer
35.705
959081AF2-199 GEN
Solar/Wind Harmer
10.921
971067AG2-660 GEN
Solar/Wind Harmer
2.54
274872LEEDK;1U
Solar/Wind Harmer
5.07
972031AH1-564 GEN
50/50
31.109
274657BYRON ;2U
50/50
12.007
274761LEE CO EC;2U
Adder
12.155
276158O29GEN2
Solar/Wind Harmer
4.501
276861AD2-134 GEN
Solar/Wind Harmer
1.33
274856ECOGROVE ;U1
Solar/Wind Harmer
5.234
276611AD2-172 GEN
Solar/Wind Harmer
3.971
938861AE1-114 GEN
Solar/Wind Harmer
10.904
274762LEE CO EC;3U
Adder
12.155
276603SUBLETTE C
Solar/Wind Harmer
1.154
274765LEE CO EC;6U
Adder
12.183
274763LEE CO EC;4U
Adder
12.04
971333AH1-146 GEN
Solar/Wind Harmer
20.489
942991AE2-321 GEN
Solar/Wind Harmer
5.127
962691AG1-118 GEN
Solar/Wind Harmer
15.751
972267AH1-718 GEN
Adder
4.55
971335AH1-147 GEN
Solar/Wind Harmer
20.489
276708O09 GEN2
Solar/Wind Harmer
3.215
970921AG2-575 GEN
Solar/Wind Harmer
6.564
970921AG2-575 GEN
Solar/Wind Harmer
1.527
274855GSG-6 ;RU
Solar/Wind Harmer
2.751
961011AF2-392 GEN
Solar/Wind Harmer
11.668
957471AF2-041 GEN
Solar/Wind Harmer
32.763
960751AF2-366 GEN
Solar/Wind Harmer
1.883
971341AH1-150 GEN
Solar/Wind Harmer
21.842
971343AH1-151 GEN
Solar/Wind Harmer
21.842
276741O09 GEN1
Solar/Wind Harmer
3.215
274767LEE CO EC;8U
Adder
12.012
959091AF2-200 GEN
Solar/Wind Harmer
21.842
274858EASY ROAD;U2
Solar/Wind Harmer
6.261
276157O29GEN1
Solar/Wind Harmer
3.423
274850MENDOTA H;RU
Solar/Wind Harmer
1.913
276602WESTBROOK C
Solar/Wind Harmer
1.583
276863AD2-134 GEN
Solar/Wind Harmer
1.33
276799AD1-013 GEN
Solar/Wind Harmer
1.623
946671AF1-331 GEN
Solar/Wind Harmer
0.307
972236AH1-702 GEN2
50/50
3.807
274656BYRON ;1U
50/50
12.275
274760LEE CO EC;1U
Adder
12.155
965931AG1-462 GEN
Solar/Wind Harmer
21.597
274872LEEDK;1U
Solar/Wind Harmer
0.158
990407J1304
External Queue
6.372202396392822
990512J1326
External Queue
7.586848735809326
991092J1477
External Queue
2.9171924591064453
990117J1214
External Queue
26.098758697509766
990727J1377 G
External Queue
11.226364135742188
CBM West 2LTFEXP_CBM-W2->PJM
CBM
12.803
WECLTFEXP_WEC->PJM
CLTF
0.471
MECLTFEXP_MEC->PJM
CLTF
8.533
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.275
TVALTFEXP_TVA->PJM
CLTF
0.648
LAGNLTFEXP_LAGN->PJM
CLTF
2.437
CBM West 1LTFEXP_CBM-W1->PJM
CBM
38.5
NYPJM->LTFIMP_NY
CLTF
0.196
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.109
SIGELTFEXP_SIGE->PJM
CLTF
0.004
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.918
CPLELTFEXP_CPLE->PJM
CLTF
0.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.301

Details for AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P4_111-45-TR81____SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_111-45-TR81____SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:108.48 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1701.01
MW Contribution:31.11
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
36.874
971411AH1-196 GEN
Solar/Wind Harmer
59.956
971171AH1-044 GEN
Solar/Wind Harmer
21.842
946321AF1-296 GEN
Solar/Wind Harmer
9.025
971675AH1-338 GEN
Solar/Wind Harmer
13.322
276612AE2-035 GEN
Solar/Wind Harmer
3.971
971681AH1-341 GEN
Solar/Wind Harmer
19.548
971177AH1-047 GEN
Solar/Wind Harmer
3.423
972235AH1-702 GEN1
50/50
4.364
274857EASY ROAD;U1
Solar/Wind Harmer
6.261
274766LEE CO EC;7U
Adder
12.012
962781AG1-127 GEN
Solar/Wind Harmer
6.242
274764LEE CO EC;5U
Adder
12.183
972267AH1-718 GEN
Adder
4.55
971335AH1-147 GEN
Solar/Wind Harmer
20.489
276708O09 GEN2
Solar/Wind Harmer
3.215
970921AG2-575 GEN
Solar/Wind Harmer
6.564
970921AG2-575 GEN
Solar/Wind Harmer
1.527
274824ROCKFORD ;12
50/50
28.82
274822ROCKFORD ;11
50/50
37.14
970819AG2-516 GEN
Solar/Wind Harmer
19.524
971475AH1-234 GEN
Solar/Wind Harmer
35.705
959081AF2-199 GEN
Solar/Wind Harmer
10.921
971067AG2-660 GEN
Solar/Wind Harmer
2.54
274872LEEDK;1U
Solar/Wind Harmer
5.07
972031AH1-564 GEN
50/50
31.109
274657BYRON ;2U
50/50
12.007
274761LEE CO EC;2U
Adder
12.155
276158O29GEN2
Solar/Wind Harmer
4.501
276861AD2-134 GEN
Solar/Wind Harmer
1.33
274856ECOGROVE ;U1
Solar/Wind Harmer
5.234
276611AD2-172 GEN
Solar/Wind Harmer
3.971
938861AE1-114 GEN
Solar/Wind Harmer
10.904
274762LEE CO EC;3U
Adder
12.155
276603SUBLETTE C
Solar/Wind Harmer
1.154
962691AG1-118 GEN
Solar/Wind Harmer
15.751
274765LEE CO EC;6U
Adder
12.183
274763LEE CO EC;4U
Adder
12.04
971333AH1-146 GEN
Solar/Wind Harmer
20.489
942991AE2-321 GEN
Solar/Wind Harmer
5.127
274855GSG-6 ;RU
Solar/Wind Harmer
2.751
961011AF2-392 GEN
Solar/Wind Harmer
11.668
957471AF2-041 GEN
Solar/Wind Harmer
32.763
960751AF2-366 GEN
Solar/Wind Harmer
1.883
971341AH1-150 GEN
Solar/Wind Harmer
21.842
971343AH1-151 GEN
Solar/Wind Harmer
21.842
276741O09 GEN1
Solar/Wind Harmer
3.215
274767LEE CO EC;8U
Adder
12.012
959091AF2-200 GEN
Solar/Wind Harmer
21.842
274858EASY ROAD;U2
Solar/Wind Harmer
6.261
276157O29GEN1
Solar/Wind Harmer
3.423
274850MENDOTA H;RU
Solar/Wind Harmer
1.913
276602WESTBROOK C
Solar/Wind Harmer
1.583
276863AD2-134 GEN
Solar/Wind Harmer
1.33
276799AD1-013 GEN
Solar/Wind Harmer
1.623
946671AF1-331 GEN
Solar/Wind Harmer
0.307
972236AH1-702 GEN2
50/50
3.807
274656BYRON ;1U
50/50
12.275
274760LEE CO EC;1U
Adder
12.155
965931AG1-462 GEN
Solar/Wind Harmer
21.597
274872LEEDK;1U
Solar/Wind Harmer
0.158
990407J1304
External Queue
6.372202396392822
990512J1326
External Queue
7.586848735809326
991092J1477
External Queue
2.9171924591064453
990117J1214
External Queue
26.098758697509766
990727J1377 G
External Queue
11.226364135742188
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.918
CPLELTFEXP_CPLE->PJM
CLTF
0.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.301
CBM West 1LTFEXP_CBM-W1->PJM
CBM
38.5
NYPJM->LTFIMP_NY
CLTF
0.196
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.109
SIGELTFEXP_SIGE->PJM
CLTF
0.004
CBM West 2LTFEXP_CBM-W2->PJM
CBM
12.803
WECLTFEXP_WEC->PJM
CLTF
0.471
MECLTFEXP_MEC->PJM
CLTF
8.533
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.275
TVALTFEXP_TVA->PJM
CLTF
0.648
LAGNLTFEXP_LAGN->PJM
CLTF
2.437

Details for AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L92805__B-R_SRT-A-2


Base Case Flowgate

Area:CE
Facility Description:
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L92805__B-R_SRT-A-2
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.3 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1682.43
MW Contribution:36.73
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
43.543
971411AH1-196 GEN
Solar/Wind Harmer
44.434
946321AF1-296 GEN
Solar/Wind Harmer
3.454
971675AH1-338 GEN
Solar/Wind Harmer
2.199
971171AH1-044 GEN
Solar/Wind Harmer
7.105
972235AH1-702 GEN1
50/50
5.794
274857EASY ROAD;U1
Solar/Wind Harmer
0.002
274766LEE CO EC;7U
Adder
13.893
962781AG1-127 GEN
Solar/Wind Harmer
4.968
276612AE2-035 GEN
Solar/Wind Harmer
0.003
971681AH1-341 GEN
Solar/Wind Harmer
16.017
971177AH1-047 GEN
Solar/Wind Harmer
3.216
274657BYRON ;2U
50/50
15.91
972031AH1-564 GEN
50/50
36.735
274761LEE CO EC;2U
Adder
14.059
276158O29GEN2
Solar/Wind Harmer
0.001
276861AD2-134 GEN
Solar/Wind Harmer
0.102
971335AH1-147 GEN
Solar/Wind Harmer
30.22
274764LEE CO EC;5U
Adder
14.092
972267AH1-718 GEN
Adder
4.5
276708O09 GEN2
Solar/Wind Harmer
0.225
970921AG2-575 GEN
Solar/Wind Harmer
5.22
970921AG2-575 GEN
Solar/Wind Harmer
1.74
274824ROCKFORD ;12
50/50
34.034
274822ROCKFORD ;11
50/50
43.859
971475AH1-234 GEN
Solar/Wind Harmer
6.647
970819AG2-516 GEN
Solar/Wind Harmer
16.208
274872LEEDK;1U
Solar/Wind Harmer
0.003
959081AF2-199 GEN
Solar/Wind Harmer
3.553
971067AG2-660 GEN
Solar/Wind Harmer
1.184
274856ECOGROVE ;U1
Solar/Wind Harmer
0.297
276611AD2-172 GEN
Solar/Wind Harmer
0.003
274762LEE CO EC;3U
Adder
14.059
938861AE1-114 GEN
Solar/Wind Harmer
5.864
276603SUBLETTE C
Solar/Wind Harmer
0
962691AG1-118 GEN
Solar/Wind Harmer
12.465
971333AH1-146 GEN
Solar/Wind Harmer
30.22
274765LEE CO EC;6U
Adder
14.092
274763LEE CO EC;4U
Adder
13.926
942991AE2-321 GEN
Solar/Wind Harmer
5.226
972236AH1-702 GEN2
50/50
5.044
274656BYRON ;1U
50/50
16.295
274760LEE CO EC;1U
Adder
14.059
965931AG1-462 GEN
Solar/Wind Harmer
15.268
274872LEEDK;1U
Solar/Wind Harmer
0.177
274858EASY ROAD;U2
Solar/Wind Harmer
0.002
276157O29GEN1
Solar/Wind Harmer
1.023
274850MENDOTA H;RU
Solar/Wind Harmer
0.067
276602WESTBROOK C
Solar/Wind Harmer
0
276863AD2-134 GEN
Solar/Wind Harmer
0.102
276799AD1-013 GEN
Solar/Wind Harmer
0.001
946671AF1-331 GEN
Solar/Wind Harmer
0.597
274855GSG-6 ;RU
Solar/Wind Harmer
0.208
961011AF2-392 GEN
Solar/Wind Harmer
4.469
957471AF2-041 GEN
Solar/Wind Harmer
10.658
276741O09 GEN1
Solar/Wind Harmer
0.225
971341AH1-150 GEN
Solar/Wind Harmer
7.105
971343AH1-151 GEN
Solar/Wind Harmer
7.105
274767LEE CO EC;8U
Adder
13.893
959091AF2-200 GEN
Solar/Wind Harmer
7.105
990407J1304
External Queue
7.983032703399658
990512J1326
External Queue
9.427095413208008
991092J1477
External Queue
2.8649470806121826
991777J1629 G
External Queue
9.148280143737793
990117J1214
External Queue
32.42920684814453
990727J1377 G
External Queue
13.966062545776367
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.176
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.183
WECLTFEXP_WEC->PJM
CLTF
0.74
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.411
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.911
TVALTFEXP_TVA->PJM
CLTF
0.657
LAGNLTFEXP_LAGN->PJM
CLTF
2.56
CBM West 1LTFEXP_CBM-W1->PJM
CBM
44.565
NYPJM->LTFIMP_NY
CLTF
0.236
MECLTFEXP_MEC->PJM
CLTF
9.223

Details for AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:103.44 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1621.92
MW Contribution:36.73
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
43.543
971411AH1-196 GEN
Solar/Wind Harmer
44.434
946321AF1-296 GEN
Solar/Wind Harmer
3.454
971675AH1-338 GEN
Solar/Wind Harmer
2.199
971171AH1-044 GEN
Solar/Wind Harmer
7.105
972235AH1-702 GEN1
50/50
5.794
274857EASY ROAD;U1
Solar/Wind Harmer
0.002
274766LEE CO EC;7U
Adder
13.893
962781AG1-127 GEN
Solar/Wind Harmer
4.968
276612AE2-035 GEN
Solar/Wind Harmer
0.003
971681AH1-341 GEN
Solar/Wind Harmer
16.017
971177AH1-047 GEN
Solar/Wind Harmer
3.216
274657BYRON ;2U
50/50
15.91
972031AH1-564 GEN
50/50
36.735
274761LEE CO EC;2U
Adder
14.059
276158O29GEN2
Solar/Wind Harmer
0.001
276861AD2-134 GEN
Solar/Wind Harmer
0.102
274764LEE CO EC;5U
Adder
14.092
972267AH1-718 GEN
Adder
4.5
276708O09 GEN2
Solar/Wind Harmer
0.225
970921AG2-575 GEN
Solar/Wind Harmer
5.22
970921AG2-575 GEN
Solar/Wind Harmer
1.74
274824ROCKFORD ;12
50/50
34.034
274822ROCKFORD ;11
50/50
43.859
971475AH1-234 GEN
Solar/Wind Harmer
6.647
970819AG2-516 GEN
Solar/Wind Harmer
16.208
274872LEEDK;1U
Solar/Wind Harmer
0.003
959081AF2-199 GEN
Solar/Wind Harmer
3.553
971067AG2-660 GEN
Solar/Wind Harmer
1.184
274856ECOGROVE ;U1
Solar/Wind Harmer
0.297
276611AD2-172 GEN
Solar/Wind Harmer
0.003
274762LEE CO EC;3U
Adder
14.059
938861AE1-114 GEN
Solar/Wind Harmer
5.864
276603SUBLETTE C
Solar/Wind Harmer
0
962691AG1-118 GEN
Solar/Wind Harmer
12.465
274765LEE CO EC;6U
Adder
14.092
274763LEE CO EC;4U
Adder
13.926
942991AE2-321 GEN
Solar/Wind Harmer
5.226
972236AH1-702 GEN2
50/50
5.044
274656BYRON ;1U
50/50
16.295
274760LEE CO EC;1U
Adder
14.059
965931AG1-462 GEN
Solar/Wind Harmer
15.268
274872LEEDK;1U
Solar/Wind Harmer
0.177
274858EASY ROAD;U2
Solar/Wind Harmer
0.002
276157O29GEN1
Solar/Wind Harmer
1.023
274850MENDOTA H;RU
Solar/Wind Harmer
0.067
276602WESTBROOK C
Solar/Wind Harmer
0
276863AD2-134 GEN
Solar/Wind Harmer
0.102
276799AD1-013 GEN
Solar/Wind Harmer
0.001
946671AF1-331 GEN
Solar/Wind Harmer
0.597
274855GSG-6 ;RU
Solar/Wind Harmer
0.208
961011AF2-392 GEN
Solar/Wind Harmer
4.469
957471AF2-041 GEN
Solar/Wind Harmer
10.658
276741O09 GEN1
Solar/Wind Harmer
0.225
971341AH1-150 GEN
Solar/Wind Harmer
7.105
971343AH1-151 GEN
Solar/Wind Harmer
7.105
274767LEE CO EC;8U
Adder
13.893
959091AF2-200 GEN
Solar/Wind Harmer
7.105
990407J1304
External Queue
7.983032703399658
990512J1326
External Queue
9.427095413208008
991092J1477
External Queue
2.8649470806121826
991777J1629 G
External Queue
9.148280143737793
990117J1214
External Queue
32.42920684814453
990727J1377 G
External Queue
13.966062545776367
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.911
TVALTFEXP_TVA->PJM
CLTF
0.657
LAGNLTFEXP_LAGN->PJM
CLTF
2.56
CBM West 1LTFEXP_CBM-W1->PJM
CBM
44.565
NYPJM->LTFIMP_NY
CLTF
0.236
MECLTFEXP_MEC->PJM
CLTF
9.223
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.183
WECLTFEXP_WEC->PJM
CLTF
0.74
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.411
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.176
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002

Details for AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:CE
Facility Description:
AF2-349 TP-SILVER LK; R 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:100.38 %
Rating:1201.0 MVA
Rating Type:A
MVA to Mitigate:1205.57
MW Contribution:29.3
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
34.725
971411AH1-196 GEN
Solar/Wind Harmer
41.13
946321AF1-296 GEN
Solar/Wind Harmer
2.488
971675AH1-338 GEN
Solar/Wind Harmer
1.728
972235AH1-702 GEN1
50/50
4.021
274857EASY ROAD;U1
Solar/Wind Harmer
0.001
274766LEE CO EC;7U
Adder
9.759
962781AG1-127 GEN
Solar/Wind Harmer
4.064
276612AE2-035 GEN
Solar/Wind Harmer
0.003
971681AH1-341 GEN
Solar/Wind Harmer
12.35
971177AH1-047 GEN
Solar/Wind Harmer
2.294
972031AH1-564 GEN
50/50
29.295
274657BYRON ;2U
50/50
11.067
274761LEE CO EC;2U
Adder
9.875
276158O29GEN2
Solar/Wind Harmer
0.001
276861AD2-134 GEN
Solar/Wind Harmer
0.08
274764LEE CO EC;5U
Adder
9.898
971335AH1-147 GEN
Solar/Wind Harmer
13.206
972267AH1-718 GEN
Adder
3.211
276708O09 GEN2
Solar/Wind Harmer
0.163
970921AG2-575 GEN
Solar/Wind Harmer
4.27
970921AG2-575 GEN
Solar/Wind Harmer
1.423
274824ROCKFORD ;12
50/50
27.14
274822ROCKFORD ;11
50/50
34.975
970819AG2-516 GEN
Solar/Wind Harmer
12.59
971475AH1-234 GEN
Solar/Wind Harmer
5.032
274872LEEDK;1U
Solar/Wind Harmer
0.002
274856ECOGROVE ;U1
Solar/Wind Harmer
0.231
276611AD2-172 GEN
Solar/Wind Harmer
0.003
938861AE1-114 GEN
Solar/Wind Harmer
4.484
274762LEE CO EC;3U
Adder
9.875
276603SUBLETTE C
Solar/Wind Harmer
0
962691AG1-118 GEN
Solar/Wind Harmer
10.292
274765LEE CO EC;6U
Adder
9.898
274763LEE CO EC;4U
Adder
9.782
971333AH1-146 GEN
Solar/Wind Harmer
13.206
942991AE2-321 GEN
Solar/Wind Harmer
3.622
972236AH1-702 GEN2
50/50
3.509
274656BYRON ;1U
50/50
11.309
274760LEE CO EC;1U
Adder
9.875
965931AG1-462 GEN
Solar/Wind Harmer
10.927
274872LEEDK;1U
Solar/Wind Harmer
0.143
274858EASY ROAD;U2
Solar/Wind Harmer
0.001
276157O29GEN1
Solar/Wind Harmer
0.74
274850MENDOTA H;RU
Solar/Wind Harmer
0.052
276602WESTBROOK C
Solar/Wind Harmer
0
276863AD2-134 GEN
Solar/Wind Harmer
0.08
276799AD1-013 GEN
Solar/Wind Harmer
0.001
946671AF1-331 GEN
Solar/Wind Harmer
0.47
274855GSG-6 ;RU
Solar/Wind Harmer
0.163
961011AF2-392 GEN
Solar/Wind Harmer
3.259
276741O09 GEN1
Solar/Wind Harmer
0.163
274767LEE CO EC;8U
Adder
9.759
990407J1304
External Queue
6.031682968139648
990512J1326
External Queue
7.093409538269043
990117J1214
External Queue
24.40132713317871
990727J1377 G
External Queue
10.617561340332031
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.389
TVALTFEXP_TVA->PJM
CLTF
0.476
LAGNLTFEXP_LAGN->PJM
CLTF
1.842
CBM West 1LTFEXP_CBM-W1->PJM
CBM
31.08
NYPJM->LTFIMP_NY
CLTF
0.165
MECLTFEXP_MEC->PJM
CLTF
6.605
CBM West 2LTFEXP_CBM-W2->PJM
CBM
9.513
WECLTFEXP_WEC->PJM
CLTF
0.345
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.282
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.143
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.1
SIGELTFEXP_SIGE->PJM
CLTF
0.002

Details for CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line l/o COMED_P4_144-45-BT7-8___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_144-45-BT7-8___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:117.47 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1841.95
MW Contribution:36.78
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
43.598
946321AF1-296 GEN
Solar/Wind Harmer
9.234
971675AH1-338 GEN
Solar/Wind Harmer
14.566
971171AH1-044 GEN
Solar/Wind Harmer
10.168
972235AH1-702 GEN1
50/50
5.799
276612AE2-035 GEN
Solar/Wind Harmer
4.629
971681AH1-341 GEN
Solar/Wind Harmer
21.411
971177AH1-047 GEN
Solar/Wind Harmer
4.41
274657BYRON ;2U
50/50
15.925
972031AH1-564 GEN
50/50
36.781
274761LEE CO EC;2U
Adder
14.071
276158O29GEN2
Solar/Wind Harmer
4.543
276861AD2-134 GEN
Solar/Wind Harmer
1.453
274857EASY ROAD;U1
Solar/Wind Harmer
7.248
274766LEE CO EC;7U
Adder
13.905
962781AG1-127 GEN
Solar/Wind Harmer
7.125
971335AH1-147 GEN
Solar/Wind Harmer
43.356
274764LEE CO EC;5U
Adder
14.104
972267AH1-718 GEN
Adder
4.503
276708O09 GEN2
Solar/Wind Harmer
3.245
970921AG2-575 GEN
Solar/Wind Harmer
7.492
970921AG2-575 GEN
Solar/Wind Harmer
1.742
274824ROCKFORD ;12
50/50
34.076
274822ROCKFORD ;11
50/50
43.914
971475AH1-234 GEN
Solar/Wind Harmer
44.028
970819AG2-516 GEN
Solar/Wind Harmer
23.26
274872LEEDK;1U
Solar/Wind Harmer
5.679
959081AF2-199 GEN
Solar/Wind Harmer
5.084
971067AG2-660 GEN
Solar/Wind Harmer
1.182
274856ECOGROVE ;U1
Solar/Wind Harmer
6.101
276611AD2-172 GEN
Solar/Wind Harmer
4.629
274762LEE CO EC;3U
Adder
14.071
938861AE1-114 GEN
Solar/Wind Harmer
12.173
276603SUBLETTE C
Solar/Wind Harmer
1.211
962691AG1-118 GEN
Solar/Wind Harmer
17.893
971333AH1-146 GEN
Solar/Wind Harmer
43.356
274765LEE CO EC;6U
Adder
14.104
274763LEE CO EC;4U
Adder
13.938
942991AE2-321 GEN
Solar/Wind Harmer
6.762
972236AH1-702 GEN2
50/50
5.049
274858EASY ROAD;U2
Solar/Wind Harmer
7.248
276157O29GEN1
Solar/Wind Harmer
3.455
274850MENDOTA H;RU
Solar/Wind Harmer
2.09
276602WESTBROOK C
Solar/Wind Harmer
1.73
276863AD2-134 GEN
Solar/Wind Harmer
1.453
276799AD1-013 GEN
Solar/Wind Harmer
1.777
946671AF1-331 GEN
Solar/Wind Harmer
0.336
274855GSG-6 ;RU
Solar/Wind Harmer
3.005
961011AF2-392 GEN
Solar/Wind Harmer
11.886
960751AF2-366 GEN
Solar/Wind Harmer
2.149
957471AF2-041 GEN
Solar/Wind Harmer
15.252
276741O09 GEN1
Solar/Wind Harmer
3.245
971341AH1-150 GEN
Solar/Wind Harmer
10.168
971343AH1-151 GEN
Solar/Wind Harmer
10.168
274767LEE CO EC;8U
Adder
13.905
959091AF2-200 GEN
Solar/Wind Harmer
10.168
274656BYRON ;1U
50/50
16.311
274760LEE CO EC;1U
Adder
14.071
965931AG1-462 GEN
Solar/Wind Harmer
21.908
274872LEEDK;1U
Solar/Wind Harmer
0.177
990407J1304
External Queue
7.996669292449951
990512J1326
External Queue
9.444316864013672
991092J1477
External Queue
2.8638265132904053
991777J1629 G
External Queue
9.207619667053223
990117J1214
External Queue
32.48844909667969
990727J1377 G
External Queue
13.982793807983398
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.914
TVALTFEXP_TVA->PJM
CLTF
0.659
LAGNLTFEXP_LAGN->PJM
CLTF
2.566
CBM West 1LTFEXP_CBM-W1->PJM
CBM
44.811
NYPJM->LTFIMP_NY
CLTF
0.236
MECLTFEXP_MEC->PJM
CLTF
9.246
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.21
WECLTFEXP_WEC->PJM
CLTF
0.762
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.412
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.176
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002

Details for CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line l/o COMED_P4_144-45-BT5-8___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_144-45-BT5-8___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:117.23 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1838.11
MW Contribution:36.36
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
43.098
946321AF1-296 GEN
Solar/Wind Harmer
9.259
971675AH1-338 GEN
Solar/Wind Harmer
14.702
971171AH1-044 GEN
Solar/Wind Harmer
10.904
276612AE2-035 GEN
Solar/Wind Harmer
4.588
971681AH1-341 GEN
Solar/Wind Harmer
21.331
971177AH1-047 GEN
Solar/Wind Harmer
4.205
274657BYRON ;2U
50/50
15.786
972031AH1-564 GEN
50/50
36.36
274761LEE CO EC;2U
Adder
14.034
276158O29GEN2
Solar/Wind Harmer
4.561
276861AD2-134 GEN
Solar/Wind Harmer
1.467
972235AH1-702 GEN1
50/50
5.749
274857EASY ROAD;U1
Solar/Wind Harmer
7.229
274766LEE CO EC;7U
Adder
13.869
962781AG1-127 GEN
Solar/Wind Harmer
7.206
971335AH1-147 GEN
Solar/Wind Harmer
42.977
274764LEE CO EC;5U
Adder
14.067
972267AH1-718 GEN
Adder
4.528
276708O09 GEN2
Solar/Wind Harmer
3.258
970921AG2-575 GEN
Solar/Wind Harmer
7.577
970921AG2-575 GEN
Solar/Wind Harmer
1.762
274824ROCKFORD ;12
50/50
33.686
274822ROCKFORD ;11
50/50
43.411
971475AH1-234 GEN
Solar/Wind Harmer
43.586
970819AG2-516 GEN
Solar/Wind Harmer
23.028
274872LEEDK;1U
Solar/Wind Harmer
5.758
959081AF2-199 GEN
Solar/Wind Harmer
5.452
971067AG2-660 GEN
Solar/Wind Harmer
1.268
274856ECOGROVE ;U1
Solar/Wind Harmer
6.047
276611AD2-172 GEN
Solar/Wind Harmer
4.588
274762LEE CO EC;3U
Adder
14.034
938861AE1-114 GEN
Solar/Wind Harmer
12.113
276603SUBLETTE C
Solar/Wind Harmer
1.212
962691AG1-118 GEN
Solar/Wind Harmer
18.291
971333AH1-146 GEN
Solar/Wind Harmer
42.977
274765LEE CO EC;6U
Adder
14.067
274763LEE CO EC;4U
Adder
13.902
942991AE2-321 GEN
Solar/Wind Harmer
6.399
274858EASY ROAD;U2
Solar/Wind Harmer
7.229
276157O29GEN1
Solar/Wind Harmer
3.469
274850MENDOTA H;RU
Solar/Wind Harmer
2.109
276602WESTBROOK C
Solar/Wind Harmer
1.746
276863AD2-134 GEN
Solar/Wind Harmer
1.467
276799AD1-013 GEN
Solar/Wind Harmer
1.794
946671AF1-331 GEN
Solar/Wind Harmer
0.34
274855GSG-6 ;RU
Solar/Wind Harmer
3.033
961011AF2-392 GEN
Solar/Wind Harmer
11.925
960751AF2-366 GEN
Solar/Wind Harmer
2.174
957471AF2-041 GEN
Solar/Wind Harmer
16.357
276741O09 GEN1
Solar/Wind Harmer
3.258
971341AH1-150 GEN
Solar/Wind Harmer
10.904
971343AH1-151 GEN
Solar/Wind Harmer
10.904
274767LEE CO EC;8U
Adder
13.869
959091AF2-200 GEN
Solar/Wind Harmer
10.904
972236AH1-702 GEN2
50/50
5.005
274656BYRON ;1U
50/50
16.168
274760LEE CO EC;1U
Adder
14.034
965931AG1-462 GEN
Solar/Wind Harmer
21.979
274872LEEDK;1U
Solar/Wind Harmer
0.179
990407J1304
External Queue
7.907464027404785
990512J1326
External Queue
9.342920303344727
991092J1477
External Queue
2.8840813636779785
991777J1629 G
External Queue
9.058588027954102
990117J1214
External Queue
32.139644622802734
990727J1377 G
External Queue
13.837535858154297
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.907
TVALTFEXP_TVA->PJM
CLTF
0.656
LAGNLTFEXP_LAGN->PJM
CLTF
2.557
CBM West 1LTFEXP_CBM-W1->PJM
CBM
44.389
NYPJM->LTFIMP_NY
CLTF
0.235
MECLTFEXP_MEC->PJM
CLTF
9.219
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.158
WECLTFEXP_WEC->PJM
CLTF
0.729
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.411
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.176
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002

Details for CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line l/o COMED_P4-6_006-345-BT78___SRT-A


Base Case Flowgate

Area:CE
Facility Description:
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4-6_006-345-BT78___SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:110.49 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1732.54
MW Contribution:37.92
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
44.943
946321AF1-296 GEN
Solar/Wind Harmer
8.796
971675AH1-338 GEN
Solar/Wind Harmer
14.414
971171AH1-044 GEN
Solar/Wind Harmer
9.367
276612AE2-035 GEN
Solar/Wind Harmer
4.752
971681AH1-341 GEN
Solar/Wind Harmer
21.179
971177AH1-047 GEN
Solar/Wind Harmer
4.62
274657BYRON ;2U
50/50
17.85
972031AH1-564 GEN
50/50
37.916
274761LEE CO EC;2U
Adder
12.907
276158O29GEN2
Solar/Wind Harmer
4.286
276861AD2-134 GEN
Solar/Wind Harmer
1.438
972235AH1-702 GEN1
50/50
5.259
274857EASY ROAD;U1
Solar/Wind Harmer
6.648
274766LEE CO EC;7U
Adder
12.755
962781AG1-127 GEN
Solar/Wind Harmer
7.214
274764LEE CO EC;5U
Adder
12.937
972267AH1-718 GEN
Adder
4.193
276708O09 GEN2
Solar/Wind Harmer
3.061
970921AG2-575 GEN
Solar/Wind Harmer
7.585
970921AG2-575 GEN
Solar/Wind Harmer
1.764
274824ROCKFORD ;12
50/50
35.129
274822ROCKFORD ;11
50/50
45.271
971475AH1-234 GEN
Solar/Wind Harmer
46.897
970819AG2-516 GEN
Solar/Wind Harmer
24.195
274872LEEDK;1U
Solar/Wind Harmer
5.696
959081AF2-199 GEN
Solar/Wind Harmer
4.683
971067AG2-660 GEN
Solar/Wind Harmer
1.089
274856ECOGROVE ;U1
Solar/Wind Harmer
6.263
276611AD2-172 GEN
Solar/Wind Harmer
4.752
938861AE1-114 GEN
Solar/Wind Harmer
12.204
274762LEE CO EC;3U
Adder
12.907
276603SUBLETTE C
Solar/Wind Harmer
1.169
962691AG1-118 GEN
Solar/Wind Harmer
18.087
274765LEE CO EC;6U
Adder
12.937
274763LEE CO EC;4U
Adder
12.785
942991AE2-321 GEN
Solar/Wind Harmer
7.135
274858EASY ROAD;U2
Solar/Wind Harmer
6.648
276157O29GEN1
Solar/Wind Harmer
3.26
274850MENDOTA H;RU
Solar/Wind Harmer
2.067
276602WESTBROOK C
Solar/Wind Harmer
1.711
276863AD2-134 GEN
Solar/Wind Harmer
1.438
276799AD1-013 GEN
Solar/Wind Harmer
1.759
946671AF1-331 GEN
Solar/Wind Harmer
0.333
274855GSG-6 ;RU
Solar/Wind Harmer
2.973
961011AF2-392 GEN
Solar/Wind Harmer
11.275
960751AF2-366 GEN
Solar/Wind Harmer
2.176
957471AF2-041 GEN
Solar/Wind Harmer
14.05
276741O09 GEN1
Solar/Wind Harmer
3.061
971341AH1-150 GEN
Solar/Wind Harmer
9.367
971343AH1-151 GEN
Solar/Wind Harmer
9.367
274767LEE CO EC;8U
Adder
12.755
959091AF2-200 GEN
Solar/Wind Harmer
9.367
972236AH1-702 GEN2
50/50
5.659
274656BYRON ;1U
50/50
14.792
274760LEE CO EC;1U
Adder
12.907
965931AG1-462 GEN
Solar/Wind Harmer
20.756
274872LEEDK;1U
Solar/Wind Harmer
0.177
990407J1304
External Queue
8.578377723693848
990512J1326
External Queue
10.086955070495605
991092J1477
External Queue
2.650393486022949
991777J1629 G
External Queue
9.956707000732422
990117J1214
External Queue
34.69912338256836
990727J1377 G
External Queue
14.958372116088867
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.877
TVALTFEXP_TVA->PJM
CLTF
0.647
LAGNLTFEXP_LAGN->PJM
CLTF
2.531
CBM West 1LTFEXP_CBM-W1->PJM
CBM
46.123
NYPJM->LTFIMP_NY
CLTF
0.233
MECLTFEXP_MEC->PJM
CLTF
9.145
CBM West 2LTFEXP_CBM-W2->PJM
CBM
12.943
WECLTFEXP_WEC->PJM
CLTF
0.873
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.41
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.17
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002

Details for CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line l/o COMED_P2-2_111_EJ-345B__1_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P2-2_111_EJ-345B__1_SRT-A
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:104.67 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1641.15
MW Contribution:31.11
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
36.874
971171AH1-044 GEN
Solar/Wind Harmer
21.842
946321AF1-296 GEN
Solar/Wind Harmer
9.025
971675AH1-338 GEN
Solar/Wind Harmer
13.322
276612AE2-035 GEN
Solar/Wind Harmer
3.971
971681AH1-341 GEN
Solar/Wind Harmer
19.548
971177AH1-047 GEN
Solar/Wind Harmer
3.423
972235AH1-702 GEN1
50/50
4.364
274857EASY ROAD;U1
Solar/Wind Harmer
6.261
274766LEE CO EC;7U
Adder
12.012
962781AG1-127 GEN
Solar/Wind Harmer
6.242
972031AH1-564 GEN
50/50
31.109
274657BYRON ;2U
50/50
12.007
274761LEE CO EC;2U
Adder
12.155
276158O29GEN2
Solar/Wind Harmer
4.501
276861AD2-134 GEN
Solar/Wind Harmer
1.33
274824ROCKFORD ;12
50/50
28.82
274822ROCKFORD ;11
50/50
37.14
970819AG2-516 GEN
Solar/Wind Harmer
19.524
971475AH1-234 GEN
Solar/Wind Harmer
35.705
959081AF2-199 GEN
Solar/Wind Harmer
10.921
971067AG2-660 GEN
Solar/Wind Harmer
2.54
274872LEEDK;1U
Solar/Wind Harmer
5.07
274765LEE CO EC;6U
Adder
12.183
274763LEE CO EC;4U
Adder
12.04
971333AH1-146 GEN
Solar/Wind Harmer
20.489
942991AE2-321 GEN
Solar/Wind Harmer
5.127
274856ECOGROVE ;U1
Solar/Wind Harmer
5.234
276611AD2-172 GEN
Solar/Wind Harmer
3.971
938861AE1-114 GEN
Solar/Wind Harmer
10.904
274762LEE CO EC;3U
Adder
12.155
276603SUBLETTE C
Solar/Wind Harmer
1.154
962691AG1-118 GEN
Solar/Wind Harmer
15.751
274764LEE CO EC;5U
Adder
12.183
972267AH1-718 GEN
Adder
4.55
971335AH1-147 GEN
Solar/Wind Harmer
20.489
276708O09 GEN2
Solar/Wind Harmer
3.215
970921AG2-575 GEN
Solar/Wind Harmer
6.564
970921AG2-575 GEN
Solar/Wind Harmer
1.527
274855GSG-6 ;RU
Solar/Wind Harmer
2.751
961011AF2-392 GEN
Solar/Wind Harmer
11.668
957471AF2-041 GEN
Solar/Wind Harmer
32.763
960751AF2-366 GEN
Solar/Wind Harmer
1.883
971341AH1-150 GEN
Solar/Wind Harmer
21.842
971343AH1-151 GEN
Solar/Wind Harmer
21.842
276741O09 GEN1
Solar/Wind Harmer
3.215
274767LEE CO EC;8U
Adder
12.012
959091AF2-200 GEN
Solar/Wind Harmer
21.842
274858EASY ROAD;U2
Solar/Wind Harmer
6.261
276157O29GEN1
Solar/Wind Harmer
3.423
274850MENDOTA H;RU
Solar/Wind Harmer
1.913
276602WESTBROOK C
Solar/Wind Harmer
1.583
276863AD2-134 GEN
Solar/Wind Harmer
1.33
276799AD1-013 GEN
Solar/Wind Harmer
1.623
946671AF1-331 GEN
Solar/Wind Harmer
0.307
972236AH1-702 GEN2
50/50
3.807
274656BYRON ;1U
50/50
12.275
274760LEE CO EC;1U
Adder
12.155
965931AG1-462 GEN
Solar/Wind Harmer
21.597
274872LEEDK;1U
Solar/Wind Harmer
0.158
990407J1304
External Queue
6.372202396392822
990512J1326
External Queue
7.586848735809326
991092J1477
External Queue
2.9171924591064453
990117J1214
External Queue
26.098758697509766
990727J1377 G
External Queue
11.226364135742188
CBM West 2LTFEXP_CBM-W2->PJM
CBM
12.803
WECLTFEXP_WEC->PJM
CLTF
0.471
MECLTFEXP_MEC->PJM
CLTF
8.533
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.275
TVALTFEXP_TVA->PJM
CLTF
0.648
LAGNLTFEXP_LAGN->PJM
CLTF
2.437
CBM West 1LTFEXP_CBM-W1->PJM
CBM
38.5
NYPJM->LTFIMP_NY
CLTF
0.196
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.109
SIGELTFEXP_SIGE->PJM
CLTF
0.004
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.918
CPLELTFEXP_CPLE->PJM
CLTF
0.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.301

Details for CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line l/o COMED_P4_111-45-TR81____SRT-A


Base Case Flowgate

Area:CE
Facility Description:
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_111-45-TR81____SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.66 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1641.05
MW Contribution:31.11
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
36.874
971171AH1-044 GEN
Solar/Wind Harmer
21.842
946321AF1-296 GEN
Solar/Wind Harmer
9.025
971675AH1-338 GEN
Solar/Wind Harmer
13.322
276612AE2-035 GEN
Solar/Wind Harmer
3.971
971681AH1-341 GEN
Solar/Wind Harmer
19.548
971177AH1-047 GEN
Solar/Wind Harmer
3.423
972235AH1-702 GEN1
50/50
4.364
274857EASY ROAD;U1
Solar/Wind Harmer
6.261
274766LEE CO EC;7U
Adder
12.012
962781AG1-127 GEN
Solar/Wind Harmer
6.242
274824ROCKFORD ;12
50/50
28.82
274822ROCKFORD ;11
50/50
37.14
970819AG2-516 GEN
Solar/Wind Harmer
19.524
971475AH1-234 GEN
Solar/Wind Harmer
35.705
959081AF2-199 GEN
Solar/Wind Harmer
10.921
971067AG2-660 GEN
Solar/Wind Harmer
2.54
274872LEEDK;1U
Solar/Wind Harmer
5.07
972031AH1-564 GEN
50/50
31.109
274657BYRON ;2U
50/50
12.007
274761LEE CO EC;2U
Adder
12.155
276158O29GEN2
Solar/Wind Harmer
4.501
276861AD2-134 GEN
Solar/Wind Harmer
1.33
274765LEE CO EC;6U
Adder
12.183
274763LEE CO EC;4U
Adder
12.04
971333AH1-146 GEN
Solar/Wind Harmer
20.489
942991AE2-321 GEN
Solar/Wind Harmer
5.127
274856ECOGROVE ;U1
Solar/Wind Harmer
5.234
276611AD2-172 GEN
Solar/Wind Harmer
3.971
938861AE1-114 GEN
Solar/Wind Harmer
10.904
274762LEE CO EC;3U
Adder
12.155
276603SUBLETTE C
Solar/Wind Harmer
1.154
962691AG1-118 GEN
Solar/Wind Harmer
15.751
274764LEE CO EC;5U
Adder
12.183
972267AH1-718 GEN
Adder
4.55
971335AH1-147 GEN
Solar/Wind Harmer
20.489
276708O09 GEN2
Solar/Wind Harmer
3.215
970921AG2-575 GEN
Solar/Wind Harmer
6.564
970921AG2-575 GEN
Solar/Wind Harmer
1.527
274855GSG-6 ;RU
Solar/Wind Harmer
2.751
961011AF2-392 GEN
Solar/Wind Harmer
11.668
957471AF2-041 GEN
Solar/Wind Harmer
32.763
960751AF2-366 GEN
Solar/Wind Harmer
1.883
971341AH1-150 GEN
Solar/Wind Harmer
21.842
971343AH1-151 GEN
Solar/Wind Harmer
21.842
276741O09 GEN1
Solar/Wind Harmer
3.215
274767LEE CO EC;8U
Adder
12.012
959091AF2-200 GEN
Solar/Wind Harmer
21.842
274858EASY ROAD;U2
Solar/Wind Harmer
6.261
276157O29GEN1
Solar/Wind Harmer
3.423
274850MENDOTA H;RU
Solar/Wind Harmer
1.913
276602WESTBROOK C
Solar/Wind Harmer
1.583
276863AD2-134 GEN
Solar/Wind Harmer
1.33
276799AD1-013 GEN
Solar/Wind Harmer
1.623
946671AF1-331 GEN
Solar/Wind Harmer
0.307
972236AH1-702 GEN2
50/50
3.807
274656BYRON ;1U
50/50
12.275
274760LEE CO EC;1U
Adder
12.155
965931AG1-462 GEN
Solar/Wind Harmer
21.597
274872LEEDK;1U
Solar/Wind Harmer
0.158
990407J1304
External Queue
6.372202396392822
990512J1326
External Queue
7.586848735809326
991092J1477
External Queue
2.9171924591064453
990117J1214
External Queue
26.098758697509766
990727J1377 G
External Queue
11.226364135742188
CBM West 1LTFEXP_CBM-W1->PJM
CBM
38.5
NYPJM->LTFIMP_NY
CLTF
0.196
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.109
SIGELTFEXP_SIGE->PJM
CLTF
0.004
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.918
CPLELTFEXP_CPLE->PJM
CLTF
0.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.301
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.275
TVALTFEXP_TVA->PJM
CLTF
0.648
LAGNLTFEXP_LAGN->PJM
CLTF
2.437
CBM West 2LTFEXP_CBM-W2->PJM
CBM
12.803
WECLTFEXP_WEC->PJM
CLTF
0.471
MECLTFEXP_MEC->PJM
CLTF
8.533

Details for CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line l/o COMED_P4_111-45-L11124__SRT-A


Base Case Flowgate

Area:CE
Facility Description:
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P4_111-45-L11124__SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.66 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1641.05
MW Contribution:31.11
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
36.874
971171AH1-044 GEN
Solar/Wind Harmer
21.842
946321AF1-296 GEN
Solar/Wind Harmer
9.025
971675AH1-338 GEN
Solar/Wind Harmer
13.322
276612AE2-035 GEN
Solar/Wind Harmer
3.971
971681AH1-341 GEN
Solar/Wind Harmer
19.548
971177AH1-047 GEN
Solar/Wind Harmer
3.423
972235AH1-702 GEN1
50/50
4.364
274857EASY ROAD;U1
Solar/Wind Harmer
6.261
274766LEE CO EC;7U
Adder
12.012
962781AG1-127 GEN
Solar/Wind Harmer
6.242
274824ROCKFORD ;12
50/50
28.82
274822ROCKFORD ;11
50/50
37.14
970819AG2-516 GEN
Solar/Wind Harmer
19.524
971475AH1-234 GEN
Solar/Wind Harmer
35.705
959081AF2-199 GEN
Solar/Wind Harmer
10.921
971067AG2-660 GEN
Solar/Wind Harmer
2.54
274872LEEDK;1U
Solar/Wind Harmer
5.07
972031AH1-564 GEN
50/50
31.109
274657BYRON ;2U
50/50
12.007
274761LEE CO EC;2U
Adder
12.155
276158O29GEN2
Solar/Wind Harmer
4.501
276861AD2-134 GEN
Solar/Wind Harmer
1.33
274765LEE CO EC;6U
Adder
12.183
274763LEE CO EC;4U
Adder
12.04
971333AH1-146 GEN
Solar/Wind Harmer
20.489
942991AE2-321 GEN
Solar/Wind Harmer
5.127
274856ECOGROVE ;U1
Solar/Wind Harmer
5.234
276611AD2-172 GEN
Solar/Wind Harmer
3.971
938861AE1-114 GEN
Solar/Wind Harmer
10.904
274762LEE CO EC;3U
Adder
12.155
276603SUBLETTE C
Solar/Wind Harmer
1.154
962691AG1-118 GEN
Solar/Wind Harmer
15.751
274764LEE CO EC;5U
Adder
12.183
972267AH1-718 GEN
Adder
4.55
971335AH1-147 GEN
Solar/Wind Harmer
20.489
276708O09 GEN2
Solar/Wind Harmer
3.215
970921AG2-575 GEN
Solar/Wind Harmer
6.564
970921AG2-575 GEN
Solar/Wind Harmer
1.527
274855GSG-6 ;RU
Solar/Wind Harmer
2.751
961011AF2-392 GEN
Solar/Wind Harmer
11.668
957471AF2-041 GEN
Solar/Wind Harmer
32.763
960751AF2-366 GEN
Solar/Wind Harmer
1.883
971341AH1-150 GEN
Solar/Wind Harmer
21.842
971343AH1-151 GEN
Solar/Wind Harmer
21.842
276741O09 GEN1
Solar/Wind Harmer
3.215
274767LEE CO EC;8U
Adder
12.012
959091AF2-200 GEN
Solar/Wind Harmer
21.842
274858EASY ROAD;U2
Solar/Wind Harmer
6.261
276157O29GEN1
Solar/Wind Harmer
3.423
274850MENDOTA H;RU
Solar/Wind Harmer
1.913
276602WESTBROOK C
Solar/Wind Harmer
1.583
276863AD2-134 GEN
Solar/Wind Harmer
1.33
276799AD1-013 GEN
Solar/Wind Harmer
1.623
946671AF1-331 GEN
Solar/Wind Harmer
0.307
972236AH1-702 GEN2
50/50
3.807
274656BYRON ;1U
50/50
12.275
274760LEE CO EC;1U
Adder
12.155
965931AG1-462 GEN
Solar/Wind Harmer
21.597
274872LEEDK;1U
Solar/Wind Harmer
0.158
990407J1304
External Queue
6.372202396392822
990512J1326
External Queue
7.586848735809326
991092J1477
External Queue
2.9171924591064453
990117J1214
External Queue
26.098758697509766
990727J1377 G
External Queue
11.226364135742188
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.275
TVALTFEXP_TVA->PJM
CLTF
0.648
LAGNLTFEXP_LAGN->PJM
CLTF
2.437
CBM West 2LTFEXP_CBM-W2->PJM
CBM
12.803
WECLTFEXP_WEC->PJM
CLTF
0.471
MECLTFEXP_MEC->PJM
CLTF
8.533
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.918
CPLELTFEXP_CPLE->PJM
CLTF
0.001
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.301
CBM West 1LTFEXP_CBM-W1->PJM
CBM
38.5
NYPJM->LTFIMP_NY
CLTF
0.196
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.109
SIGELTFEXP_SIGE->PJM
CLTF
0.004

Details for CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L92805__B-R_SRT-A-2


Base Case Flowgate

Area:CE
Facility Description:
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L92805__B-R_SRT-A-2
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:104.46 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1638.0
MW Contribution:36.73
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
43.543
946321AF1-296 GEN
Solar/Wind Harmer
3.454
971675AH1-338 GEN
Solar/Wind Harmer
2.199
971171AH1-044 GEN
Solar/Wind Harmer
7.105
972235AH1-702 GEN1
50/50
5.794
274857EASY ROAD;U1
Solar/Wind Harmer
0.002
274766LEE CO EC;7U
Adder
13.893
962781AG1-127 GEN
Solar/Wind Harmer
4.968
276612AE2-035 GEN
Solar/Wind Harmer
0.003
971681AH1-341 GEN
Solar/Wind Harmer
16.017
971177AH1-047 GEN
Solar/Wind Harmer
3.216
274657BYRON ;2U
50/50
15.91
972031AH1-564 GEN
50/50
36.735
274761LEE CO EC;2U
Adder
14.059
276158O29GEN2
Solar/Wind Harmer
0.001
276861AD2-134 GEN
Solar/Wind Harmer
0.102
971335AH1-147 GEN
Solar/Wind Harmer
30.22
274764LEE CO EC;5U
Adder
14.092
972267AH1-718 GEN
Adder
4.5
276708O09 GEN2
Solar/Wind Harmer
0.225
970921AG2-575 GEN
Solar/Wind Harmer
5.22
970921AG2-575 GEN
Solar/Wind Harmer
1.74
274824ROCKFORD ;12
50/50
34.034
274822ROCKFORD ;11
50/50
43.859
971475AH1-234 GEN
Solar/Wind Harmer
6.647
970819AG2-516 GEN
Solar/Wind Harmer
16.208
274872LEEDK;1U
Solar/Wind Harmer
0.003
959081AF2-199 GEN
Solar/Wind Harmer
3.553
971067AG2-660 GEN
Solar/Wind Harmer
1.184
274856ECOGROVE ;U1
Solar/Wind Harmer
0.297
276611AD2-172 GEN
Solar/Wind Harmer
0.003
274762LEE CO EC;3U
Adder
14.059
938861AE1-114 GEN
Solar/Wind Harmer
5.864
276603SUBLETTE C
Solar/Wind Harmer
0
962691AG1-118 GEN
Solar/Wind Harmer
12.465
971333AH1-146 GEN
Solar/Wind Harmer
30.22
274765LEE CO EC;6U
Adder
14.092
274763LEE CO EC;4U
Adder
13.926
942991AE2-321 GEN
Solar/Wind Harmer
5.226
972236AH1-702 GEN2
50/50
5.044
274656BYRON ;1U
50/50
16.295
274760LEE CO EC;1U
Adder
14.059
965931AG1-462 GEN
Solar/Wind Harmer
15.268
274872LEEDK;1U
Solar/Wind Harmer
0.177
274858EASY ROAD;U2
Solar/Wind Harmer
0.002
276157O29GEN1
Solar/Wind Harmer
1.023
274850MENDOTA H;RU
Solar/Wind Harmer
0.067
276602WESTBROOK C
Solar/Wind Harmer
0
276863AD2-134 GEN
Solar/Wind Harmer
0.102
276799AD1-013 GEN
Solar/Wind Harmer
0.001
946671AF1-331 GEN
Solar/Wind Harmer
0.597
274855GSG-6 ;RU
Solar/Wind Harmer
0.208
961011AF2-392 GEN
Solar/Wind Harmer
4.469
957471AF2-041 GEN
Solar/Wind Harmer
10.658
276741O09 GEN1
Solar/Wind Harmer
0.225
971341AH1-150 GEN
Solar/Wind Harmer
7.105
971343AH1-151 GEN
Solar/Wind Harmer
7.105
274767LEE CO EC;8U
Adder
13.893
959091AF2-200 GEN
Solar/Wind Harmer
7.105
990407J1304
External Queue
7.983032703399658
990512J1326
External Queue
9.427095413208008
991092J1477
External Queue
2.8649470806121826
991777J1629 G
External Queue
9.148280143737793
990117J1214
External Queue
32.42920684814453
990727J1377 G
External Queue
13.966062545776367
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.176
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.183
WECLTFEXP_WEC->PJM
CLTF
0.74
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.411
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.911
TVALTFEXP_TVA->PJM
CLTF
0.657
LAGNLTFEXP_LAGN->PJM
CLTF
2.56
CBM West 1LTFEXP_CBM-W1->PJM
CBM
44.565
NYPJM->LTFIMP_NY
CLTF
0.236
MECLTFEXP_MEC->PJM
CLTF
9.223

Details for CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line l/o COMED_P1-2_345-L0626__B-R_SRT-A


Base Case Flowgate

Area:CE
Facility Description:
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line
Contingency Name:
COMED_P1-2_345-L0626__B-R_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:100.61 %
Rating:1568.0 MVA
Rating Type:STE
MVA to Mitigate:1577.49
MW Contribution:36.73
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
43.543
946321AF1-296 GEN
Solar/Wind Harmer
3.454
971675AH1-338 GEN
Solar/Wind Harmer
2.199
971171AH1-044 GEN
Solar/Wind Harmer
7.105
972235AH1-702 GEN1
50/50
5.794
274857EASY ROAD;U1
Solar/Wind Harmer
0.002
274766LEE CO EC;7U
Adder
13.893
962781AG1-127 GEN
Solar/Wind Harmer
4.968
276612AE2-035 GEN
Solar/Wind Harmer
0.003
971681AH1-341 GEN
Solar/Wind Harmer
16.017
971177AH1-047 GEN
Solar/Wind Harmer
3.216
274657BYRON ;2U
50/50
15.91
972031AH1-564 GEN
50/50
36.735
274761LEE CO EC;2U
Adder
14.059
276158O29GEN2
Solar/Wind Harmer
0.001
276861AD2-134 GEN
Solar/Wind Harmer
0.102
274764LEE CO EC;5U
Adder
14.092
972267AH1-718 GEN
Adder
4.5
276708O09 GEN2
Solar/Wind Harmer
0.225
970921AG2-575 GEN
Solar/Wind Harmer
5.22
970921AG2-575 GEN
Solar/Wind Harmer
1.74
274824ROCKFORD ;12
50/50
34.034
274822ROCKFORD ;11
50/50
43.859
971475AH1-234 GEN
Solar/Wind Harmer
6.647
970819AG2-516 GEN
Solar/Wind Harmer
16.208
274872LEEDK;1U
Solar/Wind Harmer
0.003
959081AF2-199 GEN
Solar/Wind Harmer
3.553
971067AG2-660 GEN
Solar/Wind Harmer
1.184
274856ECOGROVE ;U1
Solar/Wind Harmer
0.297
276611AD2-172 GEN
Solar/Wind Harmer
0.003
274762LEE CO EC;3U
Adder
14.059
938861AE1-114 GEN
Solar/Wind Harmer
5.864
276603SUBLETTE C
Solar/Wind Harmer
0
962691AG1-118 GEN
Solar/Wind Harmer
12.465
274765LEE CO EC;6U
Adder
14.092
274763LEE CO EC;4U
Adder
13.926
942991AE2-321 GEN
Solar/Wind Harmer
5.226
972236AH1-702 GEN2
50/50
5.044
274656BYRON ;1U
50/50
16.295
274760LEE CO EC;1U
Adder
14.059
965931AG1-462 GEN
Solar/Wind Harmer
15.268
274872LEEDK;1U
Solar/Wind Harmer
0.177
274858EASY ROAD;U2
Solar/Wind Harmer
0.002
276157O29GEN1
Solar/Wind Harmer
1.023
274850MENDOTA H;RU
Solar/Wind Harmer
0.067
276602WESTBROOK C
Solar/Wind Harmer
0
276863AD2-134 GEN
Solar/Wind Harmer
0.102
276799AD1-013 GEN
Solar/Wind Harmer
0.001
946671AF1-331 GEN
Solar/Wind Harmer
0.597
274855GSG-6 ;RU
Solar/Wind Harmer
0.208
961011AF2-392 GEN
Solar/Wind Harmer
4.469
957471AF2-041 GEN
Solar/Wind Harmer
10.658
276741O09 GEN1
Solar/Wind Harmer
0.225
971341AH1-150 GEN
Solar/Wind Harmer
7.105
971343AH1-151 GEN
Solar/Wind Harmer
7.105
274767LEE CO EC;8U
Adder
13.893
959091AF2-200 GEN
Solar/Wind Harmer
7.105
990407J1304
External Queue
7.983032703399658
990512J1326
External Queue
9.427095413208008
991092J1477
External Queue
2.8649470806121826
991777J1629 G
External Queue
9.148280143737793
990117J1214
External Queue
32.42920684814453
990727J1377 G
External Queue
13.966062545776367
CBM South 1LTFEXP_CBM-S1->PJM
CBM
1.911
TVALTFEXP_TVA->PJM
CLTF
0.657
LAGNLTFEXP_LAGN->PJM
CLTF
2.56
CBM West 1LTFEXP_CBM-W1->PJM
CBM
44.565
NYPJM->LTFIMP_NY
CLTF
0.236
MECLTFEXP_MEC->PJM
CLTF
9.223
CBM West 2LTFEXP_CBM-W2->PJM
CBM
13.183
WECLTFEXP_WEC->PJM
CLTF
0.74
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.411
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.176
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.145
SIGELTFEXP_SIGE->PJM
CLTF
0.002

Details for [AH1-564] ROCKFORD ;RP-SABROOKE ; R 138.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:CE
Facility Description:
ROCKFORD ;RP-SABROOKE ; R 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:104.08 %
Rating:310.0 MVA
Rating Type:A
MVA to Mitigate:322.64
MW Contribution:150.0
IPD Plant:AH1-564
Bus #Bus NameTypeMW Contribution
972031AH1-564 GEN
PJM_IPD_GROUP
150

Details for ROCKFORD ;RP-SABROOKE ; R 138.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:CE
Facility Description:
ROCKFORD ;RP-SABROOKE ; R 138.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:104.06 %
Rating:310.0 MVA
Rating Type:A
MVA to Mitigate:322.6
MW Contribution:150.0
Bus #Bus NameTypeMW Contribution
274823ROCKFORD ;21
50/50
177.8
972031AH1-564 GEN
50/50
150
CONTINGENCY 'COMED_P4_144-45-BT7-8___SRT-A'
 TRIP BRANCH FROM BUS 270916 TO BUS 270900 CKT 1   /*WAYNE    ; B 345.0 - TOLLWAY ; B  345.0
 TRIP BRANCH FROM BUS 275228 TO BUS 270916 CKT 1   /*WAYNE    ;1M 138.0 - WAYNE    ; B 345.0
 TRIP BRANCH FROM BUS 275228 TO BUS 272740 CKT 1   /*WAYNE    ;1M 138.0 - WAYNE    ; B 138.0
 TRIP BRANCH FROM BUS 275228 TO BUS 275328 CKT 1   /*WAYNE    ;1M 138.0 - WAYNE    ;1C  34.5
 TRIP BRANCH FROM BUS 971332 TO BUS 270916 CKT 1   /*AH1-146 TP   345.0 - WAYNE    ; B 345.0
END
CONTINGENCY 'COMED_P4_144-45-BT5-8___SRT-A'
 TRIP BRANCH FROM BUS 270916 TO BUS 270917 CKT Z1   /*WAYNE    ; B 345.0 - WAYNE    ; R 345.0
 TRIP BRANCH FROM BUS 971332 TO BUS 270916 CKT 1    /*AH1-146 TP   345.0 - WAYNE    ; B 345.0
END
CONTINGENCY 'COMED_P4-6_006-345-BT78___SRT-A'
 TRIP BRANCH FROM BUS 270678 TO BUS 270679 CKT Z1   /*BYRON    ; B 345.0 - BYRON    ; R 345.0
 TRIP BRANCH FROM BUS 270678 TO BUS 971332 CKT 1    /*BYRON    ; B 345.0 - AH1-146 TP   345.0
END
CONTINGENCY 'COMED_P2-2_111_EJ-345B__1_SRT-A'
 DISCONNECT BUS 270732   /*ELECT JCT;1B 345.0
END
CONTINGENCY 'COMED_P4_111-45-L11124__SRT-A'
 DISCONNECT BUS 270732                             /*ELECT JCT;1B 345.0
 TRIP BRANCH FROM BUS 270732 TO BUS 270814 CKT 1   /*ELECT JCT;1B 345.0 - LOMBARD  ;4B 345.0
END
CONTINGENCY 'COMED_P4_111-45-TR81____SRT-A'
 DISCONNECT BUS 270732                             /*ELECT JCT;1B 345.0
 TRIP BRANCH FROM BUS 275182 TO BUS 270732 CKT 1   /*ELECT JCT;1M 138.0 - ELECT JCT;1B 345.0
 TRIP BRANCH FROM BUS 275182 TO BUS 271392 CKT 1   /*ELECT JCT;1M 138.0 - ELECT JCT;1B 138.0
 TRIP BRANCH FROM BUS 275182 TO BUS 275282 CKT 1   /*ELECT JCT;1M 138.0 - ELECT JCT;1C  34.5
END
CONTINGENCY 'COMED_P1-2_345-L92805__B-R_SRT-A-2'
 TRIP BRANCH FROM BUS 971332 TO BUS 270916 CKT 1   /*AH1-146 TP   345.0 - WAYNE    ; B 345.0
END
CONTINGENCY 'COMED_P1-2_345-L0626__B-R_SRT-A'
 TRIP BRANCH FROM BUS 270678 TO BUS 971332 CKT 1   /*BYRON    ; B 345.0 - AH1-146 TP   345.0
END
960580 to 270883 ckt 1
270694 to 960580 ckt 1
274783 to 272433 ckt 1

Winter Peak Analysis

The New Service Request AH1-564 was evaluated as a 150.0 MW (150.0 MW Capacity) injection in the ComEd area.

AH1-564 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 330.0 MW (150.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Light Load Analysis

The New Service Request AH1-564 was evaluated as a 150.0 MW injection and 150.0 MW withdrawal in the ComEd area.

AH1-564 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 330.0 MW (150.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2CE
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Base Case
SingleAC104.17 %1553.0A1617.7911.33

Details for AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line l/o Base Case


Base Case Flowgate

Area:CE
Facility Description:
AF2-041 TP-ELECT JCT;1B 345.0 kV Ckt 1 line
Contingency Name:
Base Case
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:104.17 %
Rating:1553.0 MVA
Rating Type:A
MVA to Mitigate:1617.79
MW Contribution:11.33
Bus #Bus NameTypeMW Contribution
276603SUBLETTE C
Solar/Wind Harmer
1.985
274857EASY ROAD;U1
Solar/Wind Harmer
9.37
274858EASY ROAD;U2
Solar/Wind Harmer
9.37
959081AF2-199 GEN
Solar/Wind Harmer
29.522
959091AF2-200 GEN
Solar/Wind Harmer
59.044
961011AF2-392 GEN
Solar/Wind Harmer
30.618
971067AG2-660 GEN
Solar/Wind Harmer
26.838
971171AH1-044 GEN
Solar/Wind Harmer
59.044
971341AH1-150 GEN
Solar/Wind Harmer
59.044
971343AH1-151 GEN
Solar/Wind Harmer
59.044
276157O29GEN1
Solar/Wind Harmer
8.728
276158O29GEN2
Solar/Wind Harmer
8.728
276708O09 GEN2
Solar/Wind Harmer
8.197
276741O09 GEN1
Solar/Wind Harmer
8.197
957471AF2-041 GEN
Solar/Wind Harmer
88.566
965931AG1-462 GEN
Solar/Wind Harmer
17.553
972031AH1-564 GEN
50/50
11.326
971087AG2-675 GEN
Solar/Wind Harmer
0
991092J1477
External Queue
5.354676723480225
CBM West 1LTFEXP_CBM-W1->PJM
CBM
50.328
CBM West 2LTFEXP_CBM-W2->PJM
CBM
20.242
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.039
CBM South 2LTFEXP_CBM-S2->PJM
CBM
0.718
NYPJM->LTFIMP_NY
CLTF
0.255
WECLTFEXP_WEC->PJM
CLTF
0.783
CPLELTFEXP_CPLE->PJM
CLTF
0.105
TVALTFEXP_TVA->PJM
CLTF
1.008
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.117
MECLTFEXP_MEC->PJM
CLTF
12.216
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.306
LAGNLTFEXP_LAGN->PJM
CLTF
3.652
SIGELTFEXP_SIGE->PJM
CLTF
0.011
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
470.014
957470 to 270732 ckt 1

Short Circuit Analysis

Short Circuit analysis is not performed as part of the Phase I System Impact Study. Short Circuit analysis will commence in the Phase II System Impact Study.

Stability Analysis

Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.

Reactive Power Analysis

Reactive Power analysis is not performed as part of the Phase I System Impact Study. Reactive Power analysis will commence in the Phase II System Impact Study.

Steady-State Voltage Analysis

Steady State Voltage analysis is not performed as part of the Phase I System Impact Study. Steady State Voltage analysis will commence in the Phase II System Impact Study.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AD1-013Twombly Road 138kVEngineering & Procurement
AD2-134Shady OaksPartially in Service - Under Construction
AD2-172Lena 138kVIn Service
AE1-114Maryland-Lancaster 138 kVActive
AE2-035Lena 138 kVIn Service
AE2-321Belvidere-Marengo 138 kVActive
AF1-296Garden Plain 138 kVActive
AF1-331Twombley RoadEngineering & Procurement
AF2-041Nelson-Electric Junction 345 kVActive
AF2-199Nelson-Electric Junction 345 kVActive
AF2-200Nelson-Electric Junction 345 kVActive
AF2-366Crego Rd 138 kVEngineering & Procurement
AF2-392Nelson-Dixon 138 kVActive
AG1-118Sugar Grove-Waterman 138kVActive
AG1-127Crego Rd 138 kVActive
AG1-462Cordova 345 kVActive
AG2-516Pecatonica 138kVActive
AG2-575Crego Rd. 138 kVActive
AG2-660Nelson-Electric Junction 345 kVActive
AG2-675Cordova 345 kVActive
AH1-044Nelson - Electric Junction 345 kVActive
AH1-047Marengo - Belvidere 138 kVActive
AH1-146White Rock - Wayne 345 kVActive
AH1-147White Rock - Wayne 345 kVActive
AH1-150Nelson-Electric Junction 345 kVActive
AH1-151Nelson-Electric Junction 345 kVActive
AH1-196Prairie 345 kVActive
AH1-234Wempletown - Paddock 345 kVActive
AH1-338McGirr Rd - Ritchie Road 138kVActive
AH1-341Stillman - Dixon 138KVActive
AH1-702Byron 345 kVActive
AH1-718Nelson 345 kVActive

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with potential Affected System impacts. PJM initiates coordination with each Affected System Operator by providing a list of New Service Requests in the Cycle with potential impacts to their respective system. If the Affected System Operator indicates an Affected System Study is required, PJM will notify the Project Developer or Eligible Customer of the need for an Affected System Study. See below if any Affected System Operator requires a study for this project:

Midcontinent Independent System Operator, Inc. (MISO)Study Pending
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Phase I analysis results, this project may have a cost responsibility for the following System Reinforcements:

AH1-564 System Reinforcements:
TORTEP IDTitleAllocated Cost ($USD)
ComEd(Pending) / CE_NUN_L95201_1194 Sabrooke Station Conductor$500,000
Grand Total:$500,000

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
(Pending) / CE_NUN_L95201_1
Title
194 Sabrooke Station Conductor
Description
STATION CONDUCTOR UPGRADE AT RSS 194 SABROOKE LINE TERMINAL.
Total Cost ($USD)
$500,000
Allocated Cost ($USD)
$500,000
Time Estimate
12 to 16 Months

Contributor

FacilityContingency
SABROOKE ; R-ROCKFORD ;RP 138.0 kV Ckt 1 line(Any)
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AH1-564
150.0 MW100.0%$500,000

System Reinforcement: n3515.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n3515.1 / ce-017
Title
Cherry Valley - Garden Prarie 345 kV: Line rebuild, station bus work, & Cherry Valley 345kV breaker replacement
Description
• Rebuild entire 345kV transmission line L.15616 from TSS 156 Cherry Valley to TSS 971 Prairie (approximately 15.4 miles). • Replace static wire with dual OPGW that each contain single-mode 48 count fiber. Install two (2) 48-ct FDPs at TSS 156 Cherry Valley and TSS 971 Prairie to account for new OPGW. • Upgrade the existing substation TSS 156 Cherry Valley by upgrading existing 345kV BT 4-7 circuit breaker and associated disconnect switches. • Upgrade SCADA, relay & protection at 345kV substation TSS 156 Cherry Valley to support upgrade of 345kV L.15616.
Total Cost ($USD)
$84,712,245
Allocated Cost ($USD)
$0
Time Estimate
50 Months

Contingent

Note: Based on PJM cost allocation criteria, AH1-564 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-564 could receive cost allocation. Although AH1-564 may not presently have cost responsibility for this upgrade, AH1-564 may need this upgrade in-service to be deliverable to the PJM system. If AH1-564 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
CHERRY VA; B-AF2-349 TP 345.0 kV Ckt 1 line(Any)

System Reinforcement: n6639.2
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n6639.2 / CE_NUN_L15502_4
Title
Reconductor the Electric Junction 345 kV line 93407, perform sag mitigation on 345 kV line 93407, upgrade one 345 kV circuit breaker and associated motor operated disconnect switches.
Description
• Reconductor 27.2 Miles of 345kV transmission line 93407 from structure 339 to structure 454 • Perform sag mitigation on 13.5 miles of 345kV transmission line 93407 from structure 454 to TSS 111 Electric Junction • Upgrade the existing substation TSS 111 Electric Junction by replacing L.93407 CB motor-operated disconnect switches on both sides of the breaker.
Total Cost ($USD)
$146,197,759
Allocated Cost ($USD)
$0
Time Estimate
42 Months

Potential Aggregate Contributor

Note: Based on PJM cost allocation criteria, AH1-564 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-564 could receive cost allocation. Although AH1-564 may not presently have cost responsibility for this upgrade, AH1-564 is a potential Aggregate Pool Contributor.

FacilityContingency
ELECT JCT;1B-AF2-041 TP 345.0 kV Ckt 1 line(Any)

System Reinforcement: n5318.1
Type
Load Flow
TO
ComEd
RTEP ID / TO ID
n5318.1 / ce-012a
Title
Garden Prarie - Silver Lake R 345 kV: Line rebuild, station bus work & Silver Lake 345kV Breaker Replacement
Description
• Rebuild entire 345kV transmission line L.97104 from TSS 971 Prairie to TSS 138 Silver Lake (approximately 24.7 miles). • Replace static wire with OPGW that contains single-mode 48 count fiber. Install 48-ct FDP at TSS 138 Silver Lake and TSS 971 Prairie to account for new OPGW. • Upgrade the existing substation TSS138 Silver Lake by replacing existing circuit breaker 345kV BT 3-4 & associated disconnect switches and replacing the line disconnect switch for 345kV line 97104. • Upgrade relay & protection at 345kV substation TSS 138 Silver Lake to support upgrade of 345kV transmission line, 97104.
Total Cost ($USD)
$163,968,683
Allocated Cost ($USD)
$0
Time Estimate
60 Months

Contingent

Note: Based on PJM cost allocation criteria, AH1-564 currently does not receive cost allocation towards this upgrade. As changes to the PJM process occur (such as other projects withdrawing from the cycle or reducing in size) AH1-564 could receive cost allocation. Although AH1-564 may not presently have cost responsibility for this upgrade, AH1-564 may need this upgrade in-service to be deliverable to the PJM system. If AH1-564 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
SILVER LK; R-AF2-349 TP 345.0 kV Ckt 1 line(Any)

Attachments

AH1-564 One Line Diagram

AH1-564 One Line Diagram.pdf
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.