AH1-577 Phase I Study Report

v1.00 released 2025-10-29 19:46

Clutch 69 kV

42.0 MW Capacity / 70.0 MW Energy

Introduction

This Phase I System Impact Study Report (PH1) has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, sections 307 and 308 for New Service Requests (projects) in Transition Cycle 2. The Project Developer/Eligible Customer (developer) is Dragonfly Fields Solar Project, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is American Electric Power.

Preface

The Phase I System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle executive summary format and (ii) an individual project-level basis. The Phase I System Impact Study Results (for both the executive summary and individual reports) will be publicly available on PJM’s website. Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.3, PJM takes the following actions during the Phase I System Impact Study:
  1. PJM studies each New Service Request on a summer peak, winter peak and light load RTEP base case study. The case year is dependent on the new services cycle under study. PJM will identify the base case year to be used in the study of a specific cycle on its website.
  2. PJM will only perform load flow analysis during the Phase I System Impact Study.
  3. In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with Affected System impacts and provides each Affected System Operator with a list of New Service Request in the Cycle with potential impacts to their respective system.
  4. PJM will create both the short circuit and stability base cases to be used in the Phase II System Impact Study.
  5. The Phase I System Impact Study results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.
The Transmission Owner takes the following actions during the Phase I System Impact Study:
  1. Identify required Interconnection Facilities to accommodate the New Service Request.
  2. Identify required Network Upgrades to mitigate system violations from the Phase I System Impact Study.
  3. Provide planning-level preliminary estimates of Interconnection Facilities and Network Upgrades including scope, cost and elapsed time to complete the work.

Decision Point I Requirements

At the close of Phase I System Impact Study, PJM will initiate Decision Point I (DP1). During DP1, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.A.1. Additional information on these elements is available in PJM Manual 14H sections 4.4, 6, and 7.

Allowable project modifications at Decision Point I are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 309.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

General

The Project Developer has proposed a Solar generating facility located in the American Electric Power zone — Wayne County, Ohio. The installed facilities will have a total capability of 70.0 MW with 42.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AH1-577
Project Name:
Clutch 69 kV
Project Developer Name:
Dragonfly Fields Solar Project, LLC
State:
Ohio
County:
Wayne
Transmission Owner:
American Electric Power
MFO:
70.0
MWE:
70.0
MWC:
42.0
Fuel Type:
Solar
Basecase Study Year:
2028

Physical Interconnection Facility Study

Physical Interconnection Facilities Study is not performed as part of the Phase I System Impact Study. Physical Interconnection Facilities Study will commence in the Phase II System Impact Study.

Point of Interconnection

AH1-577 will interconnect on the American Electric Power transmission system at the Clutch 69 kV Station.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In the Phase I SIS, the costs shown are subject to change as a result of a facility study performed by the TO during the Phase II or Phase III System Impact Study.

Based on the Phase I SIS results, the AH1-577 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit are also shown below.

Cost Summary
DescriptionCost Allocated to AH1-577Cost Subject to Readiness*
Transmission Owner Interconnection Facilities (TOIF)$0$0
Other Scope$0$0
Option To Build Oversight$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0
Network Upgrades$2,398,008$2,398,008
System Reliability Network Upgrades
Steady State Thermal & Voltage (SP & LL)$0$0
Transient Stability$0$0
Short Circuit$0$0
Transmission Owner Analysis
SubRegional$115,789$115,789
Distribution$0$0
Affected System Reinforcements
AFS - PJM Violatons$0$0
AFS - Non-PJM Violations$0$0
Total$2,513,798$2,513,798

* Contributes to calculation for Readiness Deposit #2 (RD2). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim deliverability study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 309 (Decision Point I) A.1.a.i and PJM Manual 14H, section 6.2, Readiness Deposit #2 (RD2) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point I (DP1), the Project Developer or Eligible Customer is required to submit Readiness Deposit #2, which is calculated as 10% of cost allocation for required Phase I Network Upgrades minus Readiness Deposit #1.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Readiness Deposit #2 Due for Project AH1-577

Readiness Deposit #2 has been calculated for the project based on the Phase I System Impact Study results and is shown in the table below. This Readiness Deposit #2 must be provided at Decision Point I through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit
Project ID10% of cost allocation for Phase I Network UpgradesReadiness Deposit #1 Received (RD1)Readiness Deposit #2 (RD2) for AH1-577 Project due at DP1
ABA - B
AH1-577$251,380$280,000$0

Note: Failure to provide an acceptable form of Readiness Deposit #2 by the end of Decision Point I will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Network Upgrades
RTEP IDDescriptionTotal Cost ($USD)Allocated Cost ($USD)
(Pending)AEP will construct a new circuit breaker and line exit for the new generator$4,796,017 $2,398,008 (See Note 1)

Based on the scope of work for the Interconnection Facilities, it is expected to take a range of 24 to 30 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

The schedule for any required Network Impact Reinforcements will be more clearly identified in the Phase II and Phase III System Impact Studies.

Note 1: A Common Use Upgrade is a Network Upgrade that is needed for the interconnection of Generating Facilities or Merchant Transmission Facilities of more than one Project Developer or Eligible Customer and which is the shared responsibility of each Project Developer or Eligible Customer. If multiple Project Developers request to connect to the same interconnection substation, the Transmission Owner will determine the cost to accommodate all the requests at the substation. The cost for the interconnection will be allocated in proportion to the number of required terminations into the substation.

Transmission Owner Analysis

Transmission Owner Identified Network Impacts

There were no network impacts to Distribution facilities identified by the Transmission Owner.

The Transmission Owner identified network impacts to Sub-Regional facilities as follows:

Transmission Owner Identified System Reinforcements on Sub-Regional Facilities
Overloaded ElementContingencyRating [MVA]Final Cycle Loading %Contribution [MW]
245283 05MANSFDSS 69.0 - 247401 05PRAIRLN SS 69.0 CKT 1 AEP_P4_#12802_05E WOOSTE 69.0_E_SRT-A
CONTINGENCY 'AEP_P4_#12802_05E WOOSTE 69.0_E_SRT-A'  

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  OPEN BRANCH FROM BUS 245284 TO BUS 245291 CKT 1                  / 245284 05HIGHLNDO 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 242903 TO BUS 245284 CKT 1                  / 242903 05COMPTON SW69.0 245284 05HIGHLNDO 69.0 1

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

END
46.0123.43 %38.5
245283 05MANSFDSS 69.0 - 247401 05PRAIRLN SS 69.0 CKT 1 AEP_P4_#17588_05E WOOSTE 69.0_D_SRT-A
CONTINGENCY 'AEP_P4_#17588_05E WOOSTE 69.0_D_SRT-A'  

  OPEN BRANCH FROM BUS 243000 TO BUS 290899 CKT 1                  / 243000 05EWOOST 138 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 290899 TO BUS 290900 CKT 1                  / 290899 05E.WOOST2EQ1.00 290900 05E.WOOST T212.0 1

  OPEN BRANCH FROM BUS 239237 TO BUS 243000 CKT 1                  / 239237 02CLVR-S 138 243000 05EWOOST 138 1

  OPEN BRANCH FROM BUS 242978 TO BUS 243000 CKT 1                  / 242978 05CANALROAD 138 243000 05EWOOST 138 1

  OPEN BRANCH FROM BUS 243000 TO BUS 288500 CKT 1                  / 243000 05EWOOST 138 288500 MINERALSPRNG 138 1

  OPEN BRANCH FROM BUS 243000 TO BUS 243158 CKT 1                  / 243000 05EWOOST 138 243158 05WOOSTE 138 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  REMOVE LOAD D1 FROM BUS 243000                                   / 243000 05EWOOST 138 D1

  REMOVE SWSHUNT FROM BUS 243000                                   / 243000 05EWOOST 138

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

  OPEN BRANCH FROM BUS 245292 TO BUS 288500 CKT 1                  / 245292 POWERPLANT 13.8 288500 MINERALSPRNG 138 1

END
46.0122.61 %38.5
245283 05MANSFDSS 69.0 - 247401 05PRAIRLN SS 69.0 CKT 1 AEP_P4_#12803_05E WOOSTE 69.0_G_SRT-A
CONTINGENCY 'AEP_P4_#12803_05E WOOSTE 69.0_G_SRT-A'  

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245270 TO BUS 245276 CKT 1                  / 245270 05CANALROAD 69.0 245276 05TEKFOR 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

END
46.0122.5 %38.5
245283 05MANSFDSS 69.0 - 247401 05PRAIRLN SS 69.0 CKT 1 AEP_P4_#12801_05E WOOSTE 69.0_F_SRT-A
CONTINGENCY 'AEP_P4_#12801_05E WOOSTE 69.0_F_SRT-A'  

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

END
46.0122.46 %38.5
245283 05MANSFDSS 69.0 - 247401 05PRAIRLN SS 69.0 CKT 1 AEP_P2-2_#12800_05E WOOSTE 69.0_1_SRT-A
CONTINGENCY 'AEP_P2-2_#12800_05E WOOSTE 69.0_1_SRT-A'  

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

END
46.0122.46 %38.5
245302 05W WOOSTE 69.0 - 245283 05MANSFDSS 69.0 CKT 1 AEP_P4_#12802_05E WOOSTE 69.0_E_SRT-A
CONTINGENCY 'AEP_P4_#12802_05E WOOSTE 69.0_E_SRT-A'  

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  OPEN BRANCH FROM BUS 245284 TO BUS 245291 CKT 1                  / 245284 05HIGHLNDO 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 242903 TO BUS 245284 CKT 1                  / 242903 05COMPTON SW69.0 245284 05HIGHLNDO 69.0 1

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

END
46.0123.65 %38.5
245302 05W WOOSTE 69.0 - 245283 05MANSFDSS 69.0 CKT 1 AEP_P4_#17588_05E WOOSTE 69.0_D_SRT-A
CONTINGENCY 'AEP_P4_#17588_05E WOOSTE 69.0_D_SRT-A'  

  OPEN BRANCH FROM BUS 243000 TO BUS 290899 CKT 1                  / 243000 05EWOOST 138 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 290899 TO BUS 290900 CKT 1                  / 290899 05E.WOOST2EQ1.00 290900 05E.WOOST T212.0 1

  OPEN BRANCH FROM BUS 239237 TO BUS 243000 CKT 1                  / 239237 02CLVR-S 138 243000 05EWOOST 138 1

  OPEN BRANCH FROM BUS 242978 TO BUS 243000 CKT 1                  / 242978 05CANALROAD 138 243000 05EWOOST 138 1

  OPEN BRANCH FROM BUS 243000 TO BUS 288500 CKT 1                  / 243000 05EWOOST 138 288500 MINERALSPRNG 138 1

  OPEN BRANCH FROM BUS 243000 TO BUS 243158 CKT 1                  / 243000 05EWOOST 138 243158 05WOOSTE 138 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  REMOVE LOAD D1 FROM BUS 243000                                   / 243000 05EWOOST 138 D1

  REMOVE SWSHUNT FROM BUS 243000                                   / 243000 05EWOOST 138

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

  OPEN BRANCH FROM BUS 245292 TO BUS 288500 CKT 1                  / 245292 POWERPLANT 13.8 288500 MINERALSPRNG 138 1

END
46.0122.83 %38.5
245302 05W WOOSTE 69.0 - 245283 05MANSFDSS 69.0 CKT 1 AEP_P4_#12803_05E WOOSTE 69.0_G_SRT-A
CONTINGENCY 'AEP_P4_#12803_05E WOOSTE 69.0_G_SRT-A'  

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245270 TO BUS 245276 CKT 1                  / 245270 05CANALROAD 69.0 245276 05TEKFOR 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

END
46.0122.72 %38.5
245302 05W WOOSTE 69.0 - 245283 05MANSFDSS 69.0 CKT 1 AEP_P2-2_#12800_05E WOOSTE 69.0_1_SRT-A
CONTINGENCY 'AEP_P2-2_#12800_05E WOOSTE 69.0_1_SRT-A'  

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

END
46.0122.65 %38.5
245302 05W WOOSTE 69.0 - 245283 05MANSFDSS 69.0 CKT 1 AEP_P4_#12801_05E WOOSTE 69.0_F_SRT-A
CONTINGENCY 'AEP_P4_#12801_05E WOOSTE 69.0_F_SRT-A'  

  OPEN BRANCH FROM BUS 245277 TO BUS 290899 CKT 1                  / 245277 05E WOOSTE 69.0 290899 05E.WOOST2EQ1.00 1

  OPEN BRANCH FROM BUS 245277 TO BUS 245291 CKT 1                  / 245277 05E WOOSTE 69.0 245291 05N WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245276 TO BUS 245277 CKT 1                  / 245276 05TEKFOR 69.0 245277 05E WOOSTE 69.0 1

  OPEN BRANCH FROM BUS 245277 TO BUS 246560 CKT 1                  / 245277 05E WOOSTE 69.0 246560 05CLUTCH SW269.0 1

  REMOVE SWSHUNT FROM BUS 245277                                   / 245277 05E WOOSTE 69.0

END
46.0122.65 %38.5
Transmission Owner Identified System Reinforcements
AH1-577 Transmission Owner Identified System Reinforcements Cost Breakdown:
TORTEP ID / TO IDCategoryTitleMW ImpactPercent AllocationAllocated Cost ($USD)
AEP(Pending) / TC2-AEP-196SubRegionalMansford - Prairie Ln: Replace 0.1 mile of 1-3/0 COPPER 7 conductor with 795 ACSR 45/7 TERN to match the remaining line38.5 MW57.9%$57,895
AEP(Pending) / TC2-AEP-195SubRegionalWooster - Mansford: Replace 0.1 mile of 1-3/0 COPPER 7 conductor with 795 ACSR 45/7 TERN to match the remaining line38.5 MW57.9%$57,895
Grand Total:$115,790

System Reinforcement
TO
AEP
RTEP ID / TO ID
(Pending) / TC2-AEP-196
Category
SubRegional
Title
Mansford - Prairie Ln: Replace 0.1 mile of 1-3/0 COPPER 7 conductor with 795 ACSR 45/7 TERN to match the remaining line
Description
Mansford - Prairie Ln: Replace 0.1 mile of 1-3/0 COPPER 7 conductor with 795 ACSR 45/7 TERN to match the remaining line
Total Cost
$100,000
Contributor
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AH1-57738.5 MW57.9%$57,895
AH1-57828.0 MW42.1%$42,105

System Reinforcement
TO
AEP
RTEP ID / TO ID
(Pending) / TC2-AEP-195
Category
SubRegional
Title
Wooster - Mansford: Replace 0.1 mile of 1-3/0 COPPER 7 conductor with 795 ACSR 45/7 TERN to match the remaining line
Description
Wooster - Mansford: Replace 0.1 mile of 1-3/0 COPPER 7 conductor with 795 ACSR 45/7 TERN to match the remaining line
Total Cost
$100,000
Contributor
Cost Allocation
ProjectMW ImpactPercent AllocationAllocated Cost ($USD)
AH1-57738.5 MW57.9%$57,895
AH1-57828.0 MW42.1%$42,105

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. AEP interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AH1-577 was evaluated as a 70.0 MW (42.0 MW Capacity) injection in the AEP area.

AH1-577 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 70.0 MW (70.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2AP
01KAMMER-01 502 J 500.0 kV Ckt 1 line
AP_P1-2_WP-500-303T_SRT-A
SingleAC102.42 %3729.0B3819.364.32
GD2AEP/AP
05KAMMER-01KAMMER 765.0/500.0 kV Ckt 1 transformer
AP_P1-2_WP-500-303T_SRT-A
SingleAC103.49 %3792.0B3924.384.32

Details for 01KAMMER-01 502 J 500.0 kV Ckt 1 line l/o AP_P1-2_WP-500-303T_SRT-A


Base Case Flowgate

Area:AP
Facility Description:
01KAMMER-01 502 J 500.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_WP-500-303T_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:102.42 %
Rating:3729.0 MVA
Rating Type:B
MVA to Mitigate:3819.36
MW Contribution:4.32
Bus #Bus NameTypeMW Contribution
23906402RICHG1
Adder
1.066
23920202STRYCT
Adder
1.209
24690905MDL-1G C
Solar/Wind Harmer
0.002
24691005MDL-2G C
Solar/Wind Harmer
0.001
24697605MDL-3G C
Solar/Wind Harmer
0.001
24697905MDL-4G C
Solar/Wind Harmer
0.001
24721705FLATG2
Adder
18.986
24721905FLATG4
Adder
18.986
24728505AND G1
Adder
3.317
24728605AND G2
Adder
3.317
24728705AND G3
Adder
6.937
24728805RICHG1
Adder
3.349
24728905RICHG2
Adder
3.349
24729505KEY G4
Adder
5.895
247604X1-042
Adder
0.373
247620Y3-023
Adder
0.415
247621Y3-024
Adder
0.217
247642Z2-115 C
Solar/Wind Harmer
0.003
247643Z2-116 C
Solar/Wind Harmer
0
23546401DTGZ2-030
Solar/Wind Helper
0.072
23585401KL_K28_T16
Solar/Wind Helper
1.117
23750701CROSSCHOOL
Solar/Wind Helper
1.186
24441205WTRV SLR C
Solar/Wind Harmer
0
25196708WSDLE6
Adder
7.744
25196808ZIMRHP
Adder
66.86
25306009OHH W.
Adder
2.649
25322209TAIT E
Adder
8.815
25322209TAIT E
Adder
9.018
25326109MON D
Adder
1.224
25326309TAIT D
Adder
1.013
270119AB2-067 GEN1
50/50
6.34
270120AB2-067 GEN2
50/50
6.34
274675JOLIET 29;7U
Adder
26.643
274675JOLIET 29;7U
Adder
25.691
274676JOLIET 29;8U
Adder
26.643
274676JOLIET 29;8U
Adder
25.691
274682WAUKEGAN ;7U
Adder
15.467
274682WAUKEGAN ;7U
Adder
15.467
274683WAUKEGAN ;8U
Adder
18.127
274683WAUKEGAN ;8U
Adder
15.281
274687WILL CNTY;4U
Adder
24.279
274687WILL CNTY;4U
Adder
24.279
274693ROCKY RD ;1P
Adder
9.492
274695ROCKY RD ;2P
Adder
9.586
274696ROCKY RD ;4P
Adder
9.813
274697ROCKY RD ;3P
Adder
2.604
274723RIVER EC ;12
Adder
15.693
274724RIVER EC ;11
Adder
15.509
274728ELWOOD EC;5P
Adder
14.27
274729ELWOOD EC;1P
Adder
14.27
274730ELWOOD EC;6P
Adder
14.27
274731ELWOOD EC;2P
Adder
14.27
274732ELWOOD EC;7P
Adder
14.27
274733ELWOOD EC;3P
Adder
14.27
274734ELWOOD EC;8P
Adder
14.27
274735ELWOOD EC;4P
Adder
14.27
274736ELWOOD EC;9P
Adder
14.27
274752CRETE EC ;2U
Adder
7.224
274753CRETE EC ;3U
Adder
7.224
274754CRETE EC ;4U
Adder
7.224
274771LINCOLN ;2U
Adder
7.388
274772LINCOLN ;3U
Adder
7.388
274773LINCOLN ;4U
Adder
7.388
274774LINCOLN ;5U
Adder
7.388
274775LINCOLN ;6U
Adder
7.388
274776LINCOLN ;7U
Adder
7.388
274777LINCOLN ;8U
Adder
7.388
274800UNIV PARK;3U
Adder
5.08
274801UNIV PARK;4U
Adder
5.08
274802UNIV PARK;5U
Adder
5.083
274803UNIV PARK;6U
Adder
5.083
274826FISK ;BP
Adder
9.541
274827FISK ;RP
Adder
6.762
274847GR RIDGE ;BU
Solar/Wind Harmer
0.002
274861TOP CROP ;1U
Solar/Wind Harmer
0.002
274862TOP CROP ;2U
Solar/Wind Harmer
0.815
274871GR RIDGE ;2U
Solar/Wind Harmer
0.001
274888KELLY CRK;1U
Solar/Wind Harmer
0.357
276164X3-005 C
Solar/Wind Harmer
0
25326509SID D
Adder
1.243
270156DARBY CT1
Adder
8.886
270157DARBY CT2
Adder
8.864
270158DARBY CT3
Adder
8.723
270159DARBY CT4
Adder
8.744
24318805MLG1
50/50
9.175
25196408WSDLE3
Adder
7.852
23777801MSM_W1-116
Solar/Wind Helper
0.097
23777901MDS_W4-102
Solar/Wind Helper
0.148
235020AA1-095 C
Solar/Wind Helper
0.044
24318905MLG2
50/50
6.56
25194408D.CRK1
Adder
6.724
25194508D.CRK3
Adder
1.257
25194608D.CRK4
Adder
1.462
25194608D.CRK4
Adder
1.462
25196008MFTGT1
Adder
1.217
25196008MFTGT1
Adder
1.179
25196108MFTGT2
Adder
1.246
25196108MFTGT2
Adder
1.342
25196208WSDLE1
Adder
7.764
25196308WSDLE2
Adder
7.783
25196508WSDLE4
Adder
7.549
25196608WSDLE5
Adder
7.627
274674JOLIET 9 ;6U
Adder
13.366
274674JOLIET 9 ;6U
Adder
13.366
274828WAUKEGAN ;BP
Adder
6.624
24379505HDWTR1G C
Solar/Wind Harmer
0.002
24385905FR-11G C
Solar/Wind Harmer
0.001
24386205FR-12G C
Solar/Wind Harmer
0.001
24386405FR-21G C
Solar/Wind Harmer
0.001
24386605FR-22G C
Solar/Wind Harmer
0.001
24387005FR-3G C
Solar/Wind Harmer
0.001
24387305FR-4G C
Solar/Wind Harmer
0.002
24695305TIMB G C
Solar/Wind Harmer
0.002
24699105WLD G1 C
Solar/Wind Harmer
0.001
24725505WLD G2 C
Solar/Wind Harmer
0.001
247607V1-011 GEN
Solar/Wind Harmer
0.001
247521TR3_G114
Solar/Wind Harmer
0.235
24755605MDL-5G
Solar/Wind Harmer
0.001
237025AB1-124 C
Solar/Wind Helper
0.14
237030AB1-096 C
Solar/Wind Helper
0.06
237034AC2-136 C
Solar/Wind Helper
0.19
237038AE2-054 C
Solar/Wind Helper
0.228
252510AF1-249 C
Solar/Wind Harmer
0.048
270122AB2-093 CT
50/50
3.544
270191TR4_S_V150
Solar/Wind Harmer
0.001
270201AC2-176 GEN
Solar/Wind Harmer
0.001
25183208HLCRTG
Solar/Wind Harmer
0.01
23906502RICHG2&3
Adder
1.066
23906502RICHG2&3
Adder
1.066
235062AE1-101 C1
Solar/Wind Helper
1.39
274805UNIV PK N;1U
Adder
4.387
274807UNIV PK N;3U
Adder
4.406
274808UNIV PK N;4U
Adder
4.359
238185AF2-356 C
Solar/Wind Helper
2.051
237080AD1-060 GEN
Solar/Wind Helper
0.286
235067AD1-061 GEN
Solar/Wind Helper
0.415
237001AB1-127_GEN
Solar/Wind Helper
0.371
237002AB1-128_GEN
Solar/Wind Helper
0.371
238152AF2-075_GEN
Solar/Wind Helper
0.571
238149AF1-291A_GEN
Solar/Wind Helper
0.114
238175AF1-290_GEN
Solar/Wind Helper
0.126
238221AF1-254 C O1
Solar/Wind Helper
0.229
238208AF1-136 C
Solar/Wind Helper
0.182
238120AE2-309 GEN
Solar/Wind Helper
0.413
238147AE2-230_GEN1
Solar/Wind Helper
0.399
238148AE2-230_GEN2
Solar/Wind Helper
0.401
238169AE2-226 GEN1
Solar/Wind Helper
0.575
238170AE2-226 GEN2
Solar/Wind Helper
0.575
276691AA1-018 GEN1
Solar/Wind Harmer
0.73
276694AA1-018 GEN2
Solar/Wind Harmer
0.001
276776AD2-060 GEN
Solar/Wind Harmer
0.635
276806AD2-047 C O1
Solar/Wind Harmer
3.445
276901AD2-066 C O1
Solar/Wind Harmer
0.006
276893AG1-478 C
Solar/Wind Harmer
0.24
238108AE1-109 GEN1
Solar/Wind Helper
0.09
238109AE1-109 GEN2
Solar/Wind Helper
0.09
238110AE1-109 GEN3
Solar/Wind Helper
0.09
235063AE1-101 C2
Solar/Wind Helper
1.39
237085AD2-009_GEN
Solar/Wind Helper
1.378
276897AD1-100 C
Solar/Wind Harmer
0.008
235054AD2-180 GEN
Solar/Wind Helper
1.552
237061AD1-155 GEN
Solar/Wind Helper
0.043
235531U2-073 GEN
Solar/Wind Helper
2.566
237006AB1-125 GEN
Solar/Wind Helper
0.105
23779801AA1-109
Solar/Wind Helper
0.163
23583801GRNGAP
Solar/Wind Helper
4.407
253338AC1-165 GEN
Solar/Wind Harmer
0.003
253333AC1-068 GEN
Solar/Wind Harmer
0.011
253325AC1-069 GEN
Solar/Wind Harmer
0.011
253343AC1-166 GEN
Solar/Wind Harmer
0.003
253415AE1-040 GEN
Solar/Wind Harmer
0.003
270180AB1-006 GEN1
Solar/Wind Harmer
0.001
270181AB1-006 GEN2
Solar/Wind Harmer
0
253378AE2-206_GEN
Solar/Wind Harmer
0.004
253394AE2-221_GEN
Solar/Wind Harmer
0.008
253398AE2-221_GEN2
Solar/Wind Harmer
0.008
253383AE2-342_GEN
Solar/Wind Harmer
0.002
252507AC2-088 GEN
Solar/Wind Harmer
0.281
252509AD1-136 GEN
Solar/Wind Harmer
0.031
252524AE2-267 GEN
Solar/Wind Harmer
0.002
252516AE2-318_GEN
Solar/Wind Harmer
4.794
252519AF1-045_GEN
Solar/Wind Harmer
5.405
253432AC1-085 GEN2
Solar/Wind Harmer
0
253433AC1-085 GEN1
Solar/Wind Harmer
0.003
253316AC1-085 GEN3
Solar/Wind Harmer
0.004
253317AC1-085 GEN4
Solar/Wind Harmer
0.004
274744AC1-111 GEN8
Adder
4.832
274745AC1-111 GEN9
Adder
4.832
274746AC1-111 G10
Adder
4.832
241955AC1-078 GEN
Solar/Wind Harmer
0.006
270166AC1-044 GEN3
50/50
6.34
270302AB2-170 GEN
Solar/Wind Harmer
0.004
270317AD1-130_GEN
Solar/Wind Harmer
0.01
270263AC1-001 GEN
Solar/Wind Harmer
0.66
238127S14_GEN_2
Solar/Wind Helper
0.65
238126S14_GEN_1
Solar/Wind Helper
0.65
238117U2-030
Solar/Wind Helper
0.265
238118U2-030_1
Solar/Wind Helper
0.265
270404AC1-167 GEN
Solar/Wind Harmer
0.003
270209AC1-174_GEN
Solar/Wind Harmer
0
927014AC1-188 GEN
Solar/Wind Harmer
0.004
270291AC1-194 GEN
Solar/Wind Harmer
5.098
270428AC2-015 C
Solar/Wind Harmer
0.004
270435AC2-044 GEN
Solar/Wind Harmer
0.825
270489AE1-102 GEN1
Solar/Wind Harmer
0.847
246936BC-WTG1
Solar/Wind Harmer
0.264
246937BC-WTG2
Solar/Wind Harmer
0.264
246938BC-WTG3
Solar/Wind Harmer
0.236
270432AC2-029 GEN
Solar/Wind Harmer
3.008
270273AD2-016 GEN
Solar/Wind Harmer
0.693
270269AC2-059
Solar/Wind Harmer
0.004
241974AD2-163_GEN2
Solar/Wind Harmer
0.005
241973AD2-163_GEN1
Solar/Wind Harmer
0.005
241972AD1-140 GEN
Solar/Wind Harmer
0.727
241808AF1-120 C
Solar/Wind Harmer
0.002
270340AC2-060 GEN
Solar/Wind Harmer
0.007
241996AE2-282_GEN
Solar/Wind Harmer
0.004
270367AC2-061_GEN
Solar/Wind Harmer
0.005
270437AC2-090 C
Solar/Wind Harmer
0.003
270222AC2-111 GEN
Solar/Wind Harmer
3.157
241813AF1-122_GEN
Solar/Wind Harmer
3.02
241960AC2-195 GEN
Solar/Wind Harmer
0.005
241832AE2-181_GEN
Solar/Wind Harmer
0.002
241840AF1-064_GEN
Solar/Wind Harmer
0.003
241858AF1-205_GEN
Solar/Wind Harmer
2.406
270297AD1-101 GEN
Solar/Wind Harmer
0.002
270377AD1-106 GEN
Solar/Wind Harmer
2.517
270258AD1-119 GEN
Solar/Wind Harmer
0.002
270383AD1-128 GEN
Solar/Wind Harmer
0.004
270449AD2-020 GEN
Solar/Wind Harmer
0
276903AD2-071 C
Solar/Wind Harmer
6.897
276805AD2-038 GEN
Solar/Wind Harmer
0.002
270216AD2-079_GEN
Solar/Wind Harmer
0.001
270471AD2-092_GEN
Solar/Wind Harmer
0.005
270349AD2-093_GEN
Solar/Wind Harmer
0.005
270588AE1-091_GEN
Solar/Wind Harmer
5.133
270499AE1-146 GEN
Solar/Wind Harmer
0.028
270505AE1-170 C O1
Solar/Wind Harmer
6.577
270594AE1-207 GEN
Solar/Wind Harmer
6.95
270032AE2-172
Solar/Wind Harmer
4.137
270599AE1-208 GEN
Solar/Wind Harmer
5.724
270031AE2-169
Solar/Wind Harmer
3.434
270510AE1-227 GEN1
Solar/Wind Harmer
1.639
270512AE1-227 GEN2
Solar/Wind Harmer
1.639
270007AE1-245 C
Solar/Wind Harmer
0.002
270541AE2-072 C
Solar/Wind Harmer
0.008
270024AE2-089 GEN
Solar/Wind Harmer
0.007
270518AE2-148 GEN
Solar/Wind Harmer
0.589
270520AE2-214 GEN
Solar/Wind Harmer
0.011
270543AE2-219 C
Solar/Wind Harmer
0.004
270043AE2-236 GEN
Solar/Wind Harmer
4.091
270356AE2-297 GEN
Solar/Wind Harmer
0.008
270063AE2-323 C
Solar/Wind Harmer
0.005
270536AF1-215 GEN2
Solar/Wind Harmer
0.008
270535AF1-215 GEN1
Solar/Wind Harmer
0.008
270055AF2-134 C O1
Solar/Wind Harmer
0.005
270284AF1-227 GEN1
Solar/Wind Harmer
0.009
270286AF1-227 GEN2
Solar/Wind Harmer
0.004
270287AF1-227 GEN3
Solar/Wind Harmer
0.004
270054AF2-122 C O1
Solar/Wind Harmer
0.006
270475AD2-096_GEN
50/50
6.148
270051AF1-062 GEN
50/50
10.221
270459AD2-067 GEN
Solar/Wind Harmer
0
270578AF1-285 GEN2
Solar/Wind Harmer
0.465
270391AF1-285 GEN3
Solar/Wind Harmer
0.465
270186AC1-089 GEN
Solar/Wind Harmer
0.004
253349AC2-067 GEN
Solar/Wind Harmer
2.017
253400AC2-068 GEN
Solar/Wind Harmer
0.811
270361_3
Solar/Wind Harmer
4.246
270575GUS2 35KV
Solar/Wind Harmer
4.246
253370AE2-315 SEC1
Adder
1.846
253370AE2-315 SEC1
Adder
1.846
253370AE2-315 SEC1
Adder
1.846
253371AE2-315 SEC2
Adder
1.746
253371AE2-315 SEC2
Adder
1.746
253372AE2-315 SEC3
Adder
1.746
253372AE2-315 SEC3
Adder
1.746
276820AF1-078_GEN
Solar/Wind Harmer
0.002
270526AF1-158 GEN
Solar/Wind Harmer
0.008
253406AD2-031_GEN
Solar/Wind Harmer
0.474
270462AD2-086
Solar/Wind Harmer
0.014
270485AE1-090_GEN
Solar/Wind Harmer
0.001
270071AF1-092 GEN
Solar/Wind Harmer
12.163
270004AE1-209 GEN
Solar/Wind Harmer
1.348
270005AE1-210 C O1
Solar/Wind Harmer
1.348
274751CRETE EC ;1U
Adder
7.224
274770LINCOLN ;1U
Adder
7.388
24791305MDL-5G
Solar/Wind Harmer
0.001
274863CRW1-WTG
Solar/Wind Harmer
0.002
274864CRW2-WTG
Solar/Wind Harmer
0.002
316095T157 G97
Solar/Wind Helper
1.188
316097T157 G90
Solar/Wind Helper
1.188
926881AC1-175 GEN
Solar/Wind Harmer
0
943121AE2-341 GEN
Solar/Wind Harmer
10.114
945421AF1-207 GEN
Solar/Wind Harmer
0.001
946031AF1-268 GEN
Solar/Wind Harmer
5.934
946171AF1-282 GEN
Solar/Wind Harmer
6.305
946181AF1-283 GEN
Solar/Wind Harmer
8.196
946581AF1-322 GEN
Solar/Wind Harmer
0
958481AF2-142 GEN
Solar/Wind Harmer
9.035
958491AF2-143 GEN
Solar/Wind Harmer
9.003
958821AF2-173 GEN
Solar/Wind Harmer
8.712
960441AF2-335 GEN
Solar/Wind Harmer
6.218
962581AG1-107 GEN
Solar/Wind Harmer
0.001
966841AG1-555 GEN
Solar/Wind Harmer
0.687
970115AG2-085 GEN
Solar/Wind Harmer
2.487
970239AG2-162 GEN
Solar/Wind Harmer
1.504
970241AG2-163 GEN
Solar/Wind Harmer
3.509
970243AG2-164 GEN
Solar/Wind Harmer
3.519
970289AG2-191 GEN
Solar/Wind Harmer
1.178
970289AG2-191 GEN
Solar/Wind Harmer
0.682
970291AG2-192 GEN
Solar/Wind Harmer
0.806
970291AG2-192 GEN
Solar/Wind Harmer
0.62
970333AG2-219 GEN
Solar/Wind Harmer
4.302
970519AG2-331 GEN
Solar/Wind Harmer
15.642
970613AG2-401 GEN
Solar/Wind Harmer
4.554
970699AG2-449 GEN
Solar/Wind Harmer
1.504
970773AG2-487 GEN
Solar/Wind Harmer
1.085
970781AG2-491 GEN
Solar/Wind Harmer
6.108
970825AG2-519 GEN
Solar/Wind Harmer
2.208
970825AG2-519 GEN
Solar/Wind Harmer
6.895
970879AG2-548 GEN
Solar/Wind Harmer
5.736
971073AG2-665 GEN
Solar/Wind Harmer
5.736
971191AH1-055 GEN
Solar/Wind Harmer
15.745
971573AH1-285 GEN
Solar/Wind Harmer
1.122
971613AH1-306 GEN
Solar/Wind Harmer
2.979
270239V3-007_GEN1
Solar/Wind Harmer
0
270240V3-007_GEN2
Solar/Wind Harmer
0.002
939401AE1-172 GEN
Solar/Wind Harmer
4.507
958171AF2-111 GEN
Solar/Wind Harmer
15.012
963741AG1-226 GEN
Solar/Wind Harmer
14.236
963841AG1-237 GEN
Solar/Wind Harmer
2.618
964991AG1-363 GEN
Solar/Wind Helper
4.264
965031AG1-367 GEN
Solar/Wind Harmer
6.223
971673AH1-337 GEN
Solar/Wind Harmer
4.074
971985AH1-537 GEN
Solar/Wind Harmer
1.825
960001AF2-291 GEN
Solar/Wind Harmer
-0.001
24639705ELKHART HY
Adder
0.138
24642205MAYFLWER
Adder
0.57
247522W1-056 GEN
Solar/Wind Harmer
0.001
247536S-71 GEN
Solar/Wind Harmer
0.253
270491AE1-102 GEN2
Solar/Wind Harmer
0.847
274887GEN-1.85
Solar/Wind Harmer
0.16
938701AE1-092 GEN
Solar/Wind Harmer
11.216
939351AE1-166 GEN
Solar/Wind Harmer
0
942081AE2-220 GEN
Solar/Wind Harmer
-0.001
942221AE2-234 GEN
Solar/Wind Harmer
0.032
942861AE2-305 GEN
Solar/Wind Harmer
5.429
943021AE2-325 GEN
Solar/Wind Harmer
3.267
943591AF1-030 GEN
Solar/Wind Harmer
6.726
943851AF1-053 GEN
Solar/Wind Harmer
1.856
943861AF1-054 GEN
Solar/Wind Harmer
2.68
944231AF1-091 GEN
Solar/Wind Harmer
1.692
944531AF1-118 GEN
Solar/Wind Harmer
28.469
944541AF1-119 GEN
Solar/Wind Harmer
0.422
945111AF1-176 GEN
Solar/Wind Harmer
11.181
945111AF1-176 GEN
Solar/Wind Harmer
5.079
945371AF1-202 GEN
Solar/Wind Harmer
0.001
945411AF1-206 GEN
Solar/Wind Harmer
-0.001
945581AF1-223 GEN
Solar/Wind Harmer
0
945631AF1-228 GEN
Solar/Wind Harmer
0
945641AF1-229 GEN
Solar/Wind Harmer
0.001
958861AF2-177 GEN
Solar/Wind Harmer
2.728
959141AF2-205 GEN
Solar/Wind Harmer
-0.001
959331AF2-224 GEN
Solar/Wind Harmer
4.506
960071AF2-298 GEN
Solar/Wind Harmer
3.209
960591AF2-350 GEN
Solar/Wind Harmer
6.08
960681AF2-359 GEN
Solar/Wind Harmer
-0.001
960841AF2-375 GEN
Solar/Wind Harmer
-0.002
960971AF2-388 GEN
Solar/Wind Harmer
3.699
961051AF2-396 GEN
Solar/Wind Harmer
12.524
961051AF2-396 GEN
Solar/Wind Harmer
8.349
961821AG1-024 GEN
Solar/Wind Harmer
4.393
961921AG1-034 GEN
Solar/Wind Harmer
6.59
962031AG1-047 GEN
Solar/Wind Harmer
-0.001
962761AG1-125 GEN
Solar/Wind Harmer
29.106
962771AG1-126 GEN
Solar/Wind Harmer
29.106
963791AG1-232 GEN
Solar/Wind Harmer
8.602
970031AG2-029 GEN
Solar/Wind Harmer
4.115
970065AG2-057 GEN
Solar/Wind Harmer
0.674
970077AG2-063 GEN
Solar/Wind Harmer
3.964
970149AG2-104 GEN
Solar/Wind Harmer
31.436
970153AG2-106 GEN
Solar/Wind Harmer
18.586
970155AG2-107 GEN
Solar/Wind Harmer
18.586
970179AG2-119 GEN
Solar/Wind Harmer
6.078
970191AG2-125 GEN
Solar/Wind Harmer
1.648
970217AG2-149 GEN
Solar/Wind Harmer
5.603
970245AG2-165 GEN
Solar/Wind Harmer
2.715
970321AG2-212 GEN
Solar/Wind Harmer
2.715
970329AG2-216 GEN
Solar/Wind Harmer
2.879
970349AG2-230 GEN
Solar/Wind Harmer
9.423
970373AG2-245 GEN
Solar/Wind Harmer
12.999
970513AG2-328 GEN
Solar/Wind Harmer
2.715
970515AG2-329 GEN
Solar/Wind Harmer
16.808
970517AG2-330 GEN
Solar/Wind Harmer
16.29
970593AG2-378 GEN
Solar/Wind Harmer
1.551
970605AG2-385 GEN
Solar/Wind Harmer
4.193
970611AG2-400 GEN
Solar/Wind Harmer
6.437
970621AG2-405 GEN
Solar/Wind Harmer
1.179
970623AG2-406 GEN
Solar/Wind Harmer
1.175
970627AG2-408 GEN
Solar/Wind Harmer
1.931
970689AG2-444 GEN
Solar/Wind Harmer
13.943
970707AG2-453 GEN
Solar/Wind Harmer
19.835
970833AG2-524 GEN
Solar/Wind Harmer
6.658
970833AG2-524 GEN
Solar/Wind Harmer
4.438
970883AG2-550 GEN
Solar/Wind Harmer
6.273
970885AG2-551 GEN
Solar/Wind Harmer
2.091
970905AG2-564 GEN
Solar/Wind Harmer
3.422
970941AG2-585 GEN
Solar/Wind Harmer
7.6
971029AG2-637 GEN
Solar/Wind Harmer
9.403
971199AH1-059 GEN
Solar/Wind Harmer
2.717
971201AH1-060 GEN
Solar/Wind Harmer
1.348
971231AH1-075 GEN
Solar/Wind Harmer
0.76
971347AH1-153 GEN
Solar/Wind Harmer
9.423
971549AH1-272 GEN
Solar/Wind Harmer
12.86
971567AH1-282 GEN
Solar/Wind Harmer
9.938
971605AH1-302 GEN
Solar/Wind Harmer
7.678
971609AH1-304 GEN
Solar/Wind Harmer
1.02
971611AH1-305 GEN
Solar/Wind Harmer
3.657
971617AH1-308 GEN
Solar/Wind Harmer
5.264
971619AH1-309 GEN
Solar/Wind Harmer
2.819
971653AH1-327 GEN
Solar/Wind Harmer
0.97
971655AH1-328 GEN
Solar/Wind Harmer
2.478
971677AH1-339 GEN
Solar/Wind Harmer
0.712
971769AH1-391 GEN
Solar/Wind Harmer
6.959
971771AH1-392 GEN
Solar/Wind Harmer
6.257
971917AH1-482 GEN
Solar/Wind Harmer
8.008
971989AH1-539 GEN
Solar/Wind Harmer
2.83
971995AH1-542 GEN
Solar/Wind Harmer
2.546
972037AH1-567 GEN1
Adder
0.16
972038AH1-567 GEN2
Adder
0.318
972057AH1-577 GEN
Solar/Wind Harmer
4.319
972059AH1-578 GEN
Solar/Wind Harmer
2.879
972159AH1-661 GEN
Adder
0.967
972173AH1-669 GEN
Solar/Wind Harmer
3.33
972227AH1-698 GEN1
Adder
2.272
972228AH1-698 GEN2
Adder
3.226
972239AH1-704 GEN
50/50
2.67
972259AH1-714 GEN
Adder
16.604
972269AH1-719 GEN
Adder
2.215
24441505OLIV SLR
Solar/Wind Harmer
0
270223U2-072_GEN1
Solar/Wind Harmer
0.001
270224U2-072_GEN2
Solar/Wind Harmer
0.001
270227U2-072_GEN3
Solar/Wind Harmer
0.001
270228U2-072_GEN4
Solar/Wind Harmer
0.001
270231U2-072_GEN5
Solar/Wind Harmer
0.001
270246TR4_N_V150
Solar/Wind Harmer
0.042
270247TR4_N_V136
Solar/Wind Harmer
0.042
276843GEN-1.7
Solar/Wind Harmer
0.197
940581AE2-045 GEN
Solar/Wind Harmer
-0.001
940611AE2-048 GEN
Solar/Wind Harmer
16.743
941391AE2-136 GEN
Solar/Wind Harmer
9.431
941551AE2-152 GEN
Solar/Wind Harmer
0
942051AE2-217 GEN
Solar/Wind Harmer
12.577
957201AF2-014 GEN
Solar/Wind Harmer
0
957741AF2-068 GEN
Solar/Wind Harmer
9.425
957841AF2-078 GEN
Solar/Wind Harmer
-0.001
957891AF2-083 GEN
Solar/Wind Harmer
0.001
958011AF2-095 GEN
Solar/Wind Harmer
8.755
958321AF2-126 GEN
Solar/Wind Harmer
0.812
958381AF2-132 GEN
Solar/Wind Harmer
0.001
958391AF2-133 GEN
Solar/Wind Harmer
0.001
964401AG1-302 GEN
Solar/Wind Harmer
0.001
964601AG1-323 GEN
Solar/Wind Harmer
2.785
964601AG1-323 GEN
Solar/Wind Harmer
1.857
964611AG1-324 GEN
Solar/Wind Harmer
0.47
964861AG1-349 GEN
Solar/Wind Harmer
-0.001
965011AG1-365 GEN
Solar/Wind Harmer
6.437
965021AG1-366 GEN
Solar/Wind Harmer
2.146
965041AG1-368 GEN
Solar/Wind Harmer
6.437
965051AG1-369 GEN
Solar/Wind Harmer
3.223
965101AG1-375 GEN
Solar/Wind Harmer
6.295
965421AG1-410 GEN
Solar/Wind Harmer
19.519
965651AG1-433 GEN
Solar/Wind Harmer
1.85
965681AG1-436 GEN
Solar/Wind Harmer
7.77
965791AG1-447 GEN
Solar/Wind Harmer
5.698
972301AH1-735 GEN
Adder
5.33
274811UNIV PK N;7U
Adder
4.378
274812UNIV PK N;8U
Adder
4.378
274814UNIV PK N;0U
Adder
4.416
CBM West 1LTFEXP_CBM-W1->PJM
CBM
123.087
CBM West 2LTFEXP_CBM-W2->PJM
CBM
94.63
CBM South 1LTFEXP_CBM-S1->PJM
CBM
24.222
CBM South 2LTFEXP_CBM-S2->PJM
CBM
6.332
NYPJM->LTFIMP_NY
CLTF
4.259
LGEELTFEXP_LGEE->PJM
CLTF
5.644
WECLTFEXP_WEC->PJM
CLTF
3.25
CPLELTFEXP_CPLE->PJM
CLTF
0.483
TVALTFEXP_TVA->PJM
CLTF
6.061
MECLTFEXP_MEC->PJM
CLTF
13.455
LAGNLTFEXP_LAGN->PJM
CLTF
12.385
SIGELTFEXP_SIGE->PJM
CLTF
0.424
AG2-052LTFEXP_AG2-052->PJM
LTF
0.204
AH1-155LTFEXP_AH1-155->PJM
LTF
0.306

Details for 05KAMMER-01KAMMER 765.0/500.0 kV Ckt 1 transformer l/o AP_P1-2_WP-500-303T_SRT-A


Base Case Flowgate

Area:AEP/AP
Facility Description:
05KAMMER-01KAMMER 765.0/500.0 kV Ckt 1 transformer
Contingency Name:
AP_P1-2_WP-500-303T_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:103.49 %
Rating:3792.0 MVA
Rating Type:B
MVA to Mitigate:3924.38
MW Contribution:4.32
Bus #Bus NameTypeMW Contribution
23906402RICHG1
Adder
1.066
23920202STRYCT
Adder
1.209
24690905MDL-1G C
Solar/Wind Harmer
0.002
24691005MDL-2G C
Solar/Wind Harmer
0.001
24697605MDL-3G C
Solar/Wind Harmer
0.001
24697905MDL-4G C
Solar/Wind Harmer
0.001
24721705FLATG2
Adder
18.986
24721905FLATG4
Adder
18.986
24728505AND G1
Adder
3.317
24728605AND G2
Adder
3.317
24728705AND G3
Adder
6.937
24728805RICHG1
Adder
3.349
24728905RICHG2
Adder
3.349
24729505KEY G4
Adder
5.895
247604X1-042
Adder
0.373
247620Y3-023
Adder
0.415
247621Y3-024
Adder
0.217
247642Z2-115 C
Solar/Wind Harmer
0.003
247643Z2-116 C
Solar/Wind Harmer
0
23546401DTGZ2-030
Solar/Wind Helper
0.072
23585401KL_K28_T16
Solar/Wind Helper
1.117
23750701CROSSCHOOL
Solar/Wind Helper
1.186
24441205WTRV SLR C
Solar/Wind Harmer
0
25196708WSDLE6
Adder
7.744
25196808ZIMRHP
Adder
66.86
25306009OHH W.
Adder
2.649
25322209TAIT E
Adder
8.815
25322209TAIT E
Adder
9.018
25326109MON D
Adder
1.224
25326309TAIT D
Adder
1.013
270119AB2-067 GEN1
50/50
6.34
270120AB2-067 GEN2
50/50
6.34
274675JOLIET 29;7U
Adder
26.643
274675JOLIET 29;7U
Adder
25.691
274676JOLIET 29;8U
Adder
26.643
274676JOLIET 29;8U
Adder
25.691
274682WAUKEGAN ;7U
Adder
15.467
274682WAUKEGAN ;7U
Adder
15.467
274683WAUKEGAN ;8U
Adder
18.127
274683WAUKEGAN ;8U
Adder
15.281
274687WILL CNTY;4U
Adder
24.279
274687WILL CNTY;4U
Adder
24.279
274693ROCKY RD ;1P
Adder
9.492
274695ROCKY RD ;2P
Adder
9.586
274696ROCKY RD ;4P
Adder
9.813
274697ROCKY RD ;3P
Adder
2.604
274723RIVER EC ;12
Adder
15.693
274724RIVER EC ;11
Adder
15.509
274728ELWOOD EC;5P
Adder
14.27
274729ELWOOD EC;1P
Adder
14.27
274730ELWOOD EC;6P
Adder
14.27
274731ELWOOD EC;2P
Adder
14.27
274732ELWOOD EC;7P
Adder
14.27
274733ELWOOD EC;3P
Adder
14.27
274734ELWOOD EC;8P
Adder
14.27
274735ELWOOD EC;4P
Adder
14.27
274736ELWOOD EC;9P
Adder
14.27
274752CRETE EC ;2U
Adder
7.224
274753CRETE EC ;3U
Adder
7.224
274754CRETE EC ;4U
Adder
7.224
274771LINCOLN ;2U
Adder
7.388
274772LINCOLN ;3U
Adder
7.388
274773LINCOLN ;4U
Adder
7.388
274774LINCOLN ;5U
Adder
7.388
274775LINCOLN ;6U
Adder
7.388
274776LINCOLN ;7U
Adder
7.388
274777LINCOLN ;8U
Adder
7.388
274800UNIV PARK;3U
Adder
5.08
274801UNIV PARK;4U
Adder
5.08
274802UNIV PARK;5U
Adder
5.083
274803UNIV PARK;6U
Adder
5.083
274826FISK ;BP
Adder
9.541
274827FISK ;RP
Adder
6.762
274847GR RIDGE ;BU
Solar/Wind Harmer
0.002
274861TOP CROP ;1U
Solar/Wind Harmer
0.002
274862TOP CROP ;2U
Solar/Wind Harmer
0.815
274871GR RIDGE ;2U
Solar/Wind Harmer
0.001
274888KELLY CRK;1U
Solar/Wind Harmer
0.357
276164X3-005 C
Solar/Wind Harmer
0
25326509SID D
Adder
1.243
270156DARBY CT1
Adder
8.886
270157DARBY CT2
Adder
8.864
270158DARBY CT3
Adder
8.723
270159DARBY CT4
Adder
8.744
24318805MLG1
50/50
9.175
25196408WSDLE3
Adder
7.852
23777801MSM_W1-116
Solar/Wind Helper
0.097
23777901MDS_W4-102
Solar/Wind Helper
0.148
235020AA1-095 C
Solar/Wind Helper
0.044
24318905MLG2
50/50
6.56
25194408D.CRK1
Adder
6.724
25194508D.CRK3
Adder
1.257
25194608D.CRK4
Adder
1.462
25194608D.CRK4
Adder
1.462
25196008MFTGT1
Adder
1.217
25196008MFTGT1
Adder
1.179
25196108MFTGT2
Adder
1.246
25196108MFTGT2
Adder
1.342
25196208WSDLE1
Adder
7.764
25196308WSDLE2
Adder
7.783
25196508WSDLE4
Adder
7.549
25196608WSDLE5
Adder
7.627
274674JOLIET 9 ;6U
Adder
13.366
274674JOLIET 9 ;6U
Adder
13.366
274828WAUKEGAN ;BP
Adder
6.624
24379505HDWTR1G C
Solar/Wind Harmer
0.002
24385905FR-11G C
Solar/Wind Harmer
0.001
24386205FR-12G C
Solar/Wind Harmer
0.001
24386405FR-21G C
Solar/Wind Harmer
0.001
24386605FR-22G C
Solar/Wind Harmer
0.001
24387005FR-3G C
Solar/Wind Harmer
0.001
24387305FR-4G C
Solar/Wind Harmer
0.002
24695305TIMB G C
Solar/Wind Harmer
0.002
24699105WLD G1 C
Solar/Wind Harmer
0.001
24725505WLD G2 C
Solar/Wind Harmer
0.001
247607V1-011 GEN
Solar/Wind Harmer
0.001
247521TR3_G114
Solar/Wind Harmer
0.235
24755605MDL-5G
Solar/Wind Harmer
0.001
237025AB1-124 C
Solar/Wind Helper
0.14
237030AB1-096 C
Solar/Wind Helper
0.06
237034AC2-136 C
Solar/Wind Helper
0.19
237038AE2-054 C
Solar/Wind Helper
0.228
252510AF1-249 C
Solar/Wind Harmer
0.048
270122AB2-093 CT
50/50
3.544
270191TR4_S_V150
Solar/Wind Harmer
0.001
270201AC2-176 GEN
Solar/Wind Harmer
0.001
25183208HLCRTG
Solar/Wind Harmer
0.01
23906502RICHG2&3
Adder
1.066
23906502RICHG2&3
Adder
1.066
235062AE1-101 C1
Solar/Wind Helper
1.39
274805UNIV PK N;1U
Adder
4.387
274807UNIV PK N;3U
Adder
4.406
274808UNIV PK N;4U
Adder
4.359
238185AF2-356 C
Solar/Wind Helper
2.051
237080AD1-060 GEN
Solar/Wind Helper
0.286
235067AD1-061 GEN
Solar/Wind Helper
0.415
237001AB1-127_GEN
Solar/Wind Helper
0.371
237002AB1-128_GEN
Solar/Wind Helper
0.371
238152AF2-075_GEN
Solar/Wind Helper
0.571
238149AF1-291A_GEN
Solar/Wind Helper
0.114
238175AF1-290_GEN
Solar/Wind Helper
0.126
238221AF1-254 C O1
Solar/Wind Helper
0.229
238208AF1-136 C
Solar/Wind Helper
0.182
238120AE2-309 GEN
Solar/Wind Helper
0.413
238147AE2-230_GEN1
Solar/Wind Helper
0.399
238148AE2-230_GEN2
Solar/Wind Helper
0.401
238169AE2-226 GEN1
Solar/Wind Helper
0.575
238170AE2-226 GEN2
Solar/Wind Helper
0.575
276691AA1-018 GEN1
Solar/Wind Harmer
0.73
276694AA1-018 GEN2
Solar/Wind Harmer
0.001
276776AD2-060 GEN
Solar/Wind Harmer
0.635
276806AD2-047 C O1
Solar/Wind Harmer
3.445
276901AD2-066 C O1
Solar/Wind Harmer
0.006
276893AG1-478 C
Solar/Wind Harmer
0.24
238108AE1-109 GEN1
Solar/Wind Helper
0.09
238109AE1-109 GEN2
Solar/Wind Helper
0.09
238110AE1-109 GEN3
Solar/Wind Helper
0.09
235063AE1-101 C2
Solar/Wind Helper
1.39
237085AD2-009_GEN
Solar/Wind Helper
1.378
276897AD1-100 C
Solar/Wind Harmer
0.008
235054AD2-180 GEN
Solar/Wind Helper
1.552
237061AD1-155 GEN
Solar/Wind Helper
0.043
235531U2-073 GEN
Solar/Wind Helper
2.566
237006AB1-125 GEN
Solar/Wind Helper
0.105
23779801AA1-109
Solar/Wind Helper
0.163
23583801GRNGAP
Solar/Wind Helper
4.407
253338AC1-165 GEN
Solar/Wind Harmer
0.003
253333AC1-068 GEN
Solar/Wind Harmer
0.011
253325AC1-069 GEN
Solar/Wind Harmer
0.011
253343AC1-166 GEN
Solar/Wind Harmer
0.003
253415AE1-040 GEN
Solar/Wind Harmer
0.003
270180AB1-006 GEN1
Solar/Wind Harmer
0.001
270181AB1-006 GEN2
Solar/Wind Harmer
0
253378AE2-206_GEN
Solar/Wind Harmer
0.004
253394AE2-221_GEN
Solar/Wind Harmer
0.008
253398AE2-221_GEN2
Solar/Wind Harmer
0.008
253383AE2-342_GEN
Solar/Wind Harmer
0.002
252507AC2-088 GEN
Solar/Wind Harmer
0.281
252509AD1-136 GEN
Solar/Wind Harmer
0.031
252524AE2-267 GEN
Solar/Wind Harmer
0.002
252516AE2-318_GEN
Solar/Wind Harmer
4.794
252519AF1-045_GEN
Solar/Wind Harmer
5.405
253432AC1-085 GEN2
Solar/Wind Harmer
0
253433AC1-085 GEN1
Solar/Wind Harmer
0.003
253316AC1-085 GEN3
Solar/Wind Harmer
0.004
253317AC1-085 GEN4
Solar/Wind Harmer
0.004
274744AC1-111 GEN8
Adder
4.832
274745AC1-111 GEN9
Adder
4.832
274746AC1-111 G10
Adder
4.832
241955AC1-078 GEN
Solar/Wind Harmer
0.006
270166AC1-044 GEN3
50/50
6.34
270302AB2-170 GEN
Solar/Wind Harmer
0.004
270317AD1-130_GEN
Solar/Wind Harmer
0.01
270263AC1-001 GEN
Solar/Wind Harmer
0.66
238127S14_GEN_2
Solar/Wind Helper
0.65
238126S14_GEN_1
Solar/Wind Helper
0.65
238117U2-030
Solar/Wind Helper
0.265
238118U2-030_1
Solar/Wind Helper
0.265
270404AC1-167 GEN
Solar/Wind Harmer
0.003
270209AC1-174_GEN
Solar/Wind Harmer
0
927014AC1-188 GEN
Solar/Wind Harmer
0.004
270291AC1-194 GEN
Solar/Wind Harmer
5.098
270428AC2-015 C
Solar/Wind Harmer
0.004
270435AC2-044 GEN
Solar/Wind Harmer
0.825
270489AE1-102 GEN1
Solar/Wind Harmer
0.847
246936BC-WTG1
Solar/Wind Harmer
0.264
246937BC-WTG2
Solar/Wind Harmer
0.264
246938BC-WTG3
Solar/Wind Harmer
0.236
270432AC2-029 GEN
Solar/Wind Harmer
3.008
270273AD2-016 GEN
Solar/Wind Harmer
0.693
270269AC2-059
Solar/Wind Harmer
0.004
241974AD2-163_GEN2
Solar/Wind Harmer
0.005
241973AD2-163_GEN1
Solar/Wind Harmer
0.005
241972AD1-140 GEN
Solar/Wind Harmer
0.727
241808AF1-120 C
Solar/Wind Harmer
0.002
270340AC2-060 GEN
Solar/Wind Harmer
0.007
241996AE2-282_GEN
Solar/Wind Harmer
0.004
270367AC2-061_GEN
Solar/Wind Harmer
0.005
270437AC2-090 C
Solar/Wind Harmer
0.003
270222AC2-111 GEN
Solar/Wind Harmer
3.157
241813AF1-122_GEN
Solar/Wind Harmer
3.02
241960AC2-195 GEN
Solar/Wind Harmer
0.005
241832AE2-181_GEN
Solar/Wind Harmer
0.002
241840AF1-064_GEN
Solar/Wind Harmer
0.003
241858AF1-205_GEN
Solar/Wind Harmer
2.406
270297AD1-101 GEN
Solar/Wind Harmer
0.002
270377AD1-106 GEN
Solar/Wind Harmer
2.517
270258AD1-119 GEN
Solar/Wind Harmer
0.002
270383AD1-128 GEN
Solar/Wind Harmer
0.004
270449AD2-020 GEN
Solar/Wind Harmer
0
276903AD2-071 C
Solar/Wind Harmer
6.897
276805AD2-038 GEN
Solar/Wind Harmer
0.002
270216AD2-079_GEN
Solar/Wind Harmer
0.001
270471AD2-092_GEN
Solar/Wind Harmer
0.005
270349AD2-093_GEN
Solar/Wind Harmer
0.005
270588AE1-091_GEN
Solar/Wind Harmer
5.133
270499AE1-146 GEN
Solar/Wind Harmer
0.028
270505AE1-170 C O1
Solar/Wind Harmer
6.577
270594AE1-207 GEN
Solar/Wind Harmer
6.95
270032AE2-172
Solar/Wind Harmer
4.137
270599AE1-208 GEN
Solar/Wind Harmer
5.724
270031AE2-169
Solar/Wind Harmer
3.434
270510AE1-227 GEN1
Solar/Wind Harmer
1.639
270512AE1-227 GEN2
Solar/Wind Harmer
1.639
270007AE1-245 C
Solar/Wind Harmer
0.002
270541AE2-072 C
Solar/Wind Harmer
0.008
270024AE2-089 GEN
Solar/Wind Harmer
0.007
270518AE2-148 GEN
Solar/Wind Harmer
0.589
270520AE2-214 GEN
Solar/Wind Harmer
0.011
270543AE2-219 C
Solar/Wind Harmer
0.004
270043AE2-236 GEN
Solar/Wind Harmer
4.091
270356AE2-297 GEN
Solar/Wind Harmer
0.008
270063AE2-323 C
Solar/Wind Harmer
0.005
270536AF1-215 GEN2
Solar/Wind Harmer
0.008
270535AF1-215 GEN1
Solar/Wind Harmer
0.008
270055AF2-134 C O1
Solar/Wind Harmer
0.005
270284AF1-227 GEN1
Solar/Wind Harmer
0.009
270286AF1-227 GEN2
Solar/Wind Harmer
0.004
270287AF1-227 GEN3
Solar/Wind Harmer
0.004
270054AF2-122 C O1
Solar/Wind Harmer
0.006
270475AD2-096_GEN
50/50
6.148
270051AF1-062 GEN
50/50
10.221
270459AD2-067 GEN
Solar/Wind Harmer
0
270578AF1-285 GEN2
Solar/Wind Harmer
0.465
270391AF1-285 GEN3
Solar/Wind Harmer
0.465
270186AC1-089 GEN
Solar/Wind Harmer
0.004
253349AC2-067 GEN
Solar/Wind Harmer
2.017
253400AC2-068 GEN
Solar/Wind Harmer
0.811
270361_3
Solar/Wind Harmer
4.246
270575GUS2 35KV
Solar/Wind Harmer
4.246
253370AE2-315 SEC1
Adder
1.846
253370AE2-315 SEC1
Adder
1.846
253370AE2-315 SEC1
Adder
1.846
253371AE2-315 SEC2
Adder
1.746
253371AE2-315 SEC2
Adder
1.746
253372AE2-315 SEC3
Adder
1.746
253372AE2-315 SEC3
Adder
1.746
276820AF1-078_GEN
Solar/Wind Harmer
0.002
270526AF1-158 GEN
Solar/Wind Harmer
0.008
253406AD2-031_GEN
Solar/Wind Harmer
0.474
270462AD2-086
Solar/Wind Harmer
0.014
270485AE1-090_GEN
Solar/Wind Harmer
0.001
270071AF1-092 GEN
Solar/Wind Harmer
12.163
270004AE1-209 GEN
Solar/Wind Harmer
1.348
270005AE1-210 C O1
Solar/Wind Harmer
1.348
274751CRETE EC ;1U
Adder
7.224
274770LINCOLN ;1U
Adder
7.388
24791305MDL-5G
Solar/Wind Harmer
0.001
274863CRW1-WTG
Solar/Wind Harmer
0.002
274864CRW2-WTG
Solar/Wind Harmer
0.002
316095T157 G97
Solar/Wind Helper
1.188
316097T157 G90
Solar/Wind Helper
1.188
926881AC1-175 GEN
Solar/Wind Harmer
0
943121AE2-341 GEN
Solar/Wind Harmer
10.114
945421AF1-207 GEN
Solar/Wind Harmer
0.001
946031AF1-268 GEN
Solar/Wind Harmer
5.934
946171AF1-282 GEN
Solar/Wind Harmer
6.305
946181AF1-283 GEN
Solar/Wind Harmer
8.196
946581AF1-322 GEN
Solar/Wind Harmer
0
958481AF2-142 GEN
Solar/Wind Harmer
9.035
958491AF2-143 GEN
Solar/Wind Harmer
9.003
958821AF2-173 GEN
Solar/Wind Harmer
8.712
960441AF2-335 GEN
Solar/Wind Harmer
6.218
962581AG1-107 GEN
Solar/Wind Harmer
0.001
966841AG1-555 GEN
Solar/Wind Harmer
0.687
970115AG2-085 GEN
Solar/Wind Harmer
2.487
970239AG2-162 GEN
Solar/Wind Harmer
1.504
970241AG2-163 GEN
Solar/Wind Harmer
3.509
970243AG2-164 GEN
Solar/Wind Harmer
3.519
970289AG2-191 GEN
Solar/Wind Harmer
1.178
970289AG2-191 GEN
Solar/Wind Harmer
0.682
970291AG2-192 GEN
Solar/Wind Harmer
0.806
970291AG2-192 GEN
Solar/Wind Harmer
0.62
970333AG2-219 GEN
Solar/Wind Harmer
4.302
970519AG2-331 GEN
Solar/Wind Harmer
15.642
970613AG2-401 GEN
Solar/Wind Harmer
4.554
970699AG2-449 GEN
Solar/Wind Harmer
1.504
970773AG2-487 GEN
Solar/Wind Harmer
1.085
970781AG2-491 GEN
Solar/Wind Harmer
6.108
970825AG2-519 GEN
Solar/Wind Harmer
2.208
970825AG2-519 GEN
Solar/Wind Harmer
6.895
970879AG2-548 GEN
Solar/Wind Harmer
5.736
971073AG2-665 GEN
Solar/Wind Harmer
5.736
971191AH1-055 GEN
Solar/Wind Harmer
15.745
971573AH1-285 GEN
Solar/Wind Harmer
1.122
971613AH1-306 GEN
Solar/Wind Harmer
2.979
270239V3-007_GEN1
Solar/Wind Harmer
0
270240V3-007_GEN2
Solar/Wind Harmer
0.002
939401AE1-172 GEN
Solar/Wind Harmer
4.507
958171AF2-111 GEN
Solar/Wind Harmer
15.012
963741AG1-226 GEN
Solar/Wind Harmer
14.236
963841AG1-237 GEN
Solar/Wind Harmer
2.618
964991AG1-363 GEN
Solar/Wind Helper
4.264
965031AG1-367 GEN
Solar/Wind Harmer
6.223
971673AH1-337 GEN
Solar/Wind Harmer
4.074
971985AH1-537 GEN
Solar/Wind Harmer
1.825
960001AF2-291 GEN
Solar/Wind Harmer
-0.001
24639705ELKHART HY
Adder
0.138
24642205MAYFLWER
Adder
0.57
247522W1-056 GEN
Solar/Wind Harmer
0.001
247536S-71 GEN
Solar/Wind Harmer
0.253
270491AE1-102 GEN2
Solar/Wind Harmer
0.847
274887GEN-1.85
Solar/Wind Harmer
0.16
938701AE1-092 GEN
Solar/Wind Harmer
11.216
939351AE1-166 GEN
Solar/Wind Harmer
0
942081AE2-220 GEN
Solar/Wind Harmer
-0.001
942221AE2-234 GEN
Solar/Wind Harmer
0.032
942861AE2-305 GEN
Solar/Wind Harmer
5.429
943021AE2-325 GEN
Solar/Wind Harmer
3.267
943591AF1-030 GEN
Solar/Wind Harmer
6.726
943851AF1-053 GEN
Solar/Wind Harmer
1.856
943861AF1-054 GEN
Solar/Wind Harmer
2.68
944231AF1-091 GEN
Solar/Wind Harmer
1.692
944531AF1-118 GEN
Solar/Wind Harmer
28.469
944541AF1-119 GEN
Solar/Wind Harmer
0.422
945111AF1-176 GEN
Solar/Wind Harmer
11.181
945111AF1-176 GEN
Solar/Wind Harmer
5.079
945371AF1-202 GEN
Solar/Wind Harmer
0.001
945411AF1-206 GEN
Solar/Wind Harmer
-0.001
945581AF1-223 GEN
Solar/Wind Harmer
0
945631AF1-228 GEN
Solar/Wind Harmer
0
945641AF1-229 GEN
Solar/Wind Harmer
0.001
958861AF2-177 GEN
Solar/Wind Harmer
2.728
959141AF2-205 GEN
Solar/Wind Harmer
-0.001
959331AF2-224 GEN
Solar/Wind Harmer
4.506
960071AF2-298 GEN
Solar/Wind Harmer
3.209
960591AF2-350 GEN
Solar/Wind Harmer
6.08
960681AF2-359 GEN
Solar/Wind Harmer
-0.001
960841AF2-375 GEN
Solar/Wind Harmer
-0.002
960971AF2-388 GEN
Solar/Wind Harmer
3.699
961051AF2-396 GEN
Solar/Wind Harmer
12.524
961051AF2-396 GEN
Solar/Wind Harmer
8.349
961821AG1-024 GEN
Solar/Wind Harmer
4.393
961921AG1-034 GEN
Solar/Wind Harmer
6.59
962031AG1-047 GEN
Solar/Wind Harmer
-0.001
962761AG1-125 GEN
Solar/Wind Harmer
29.106
962771AG1-126 GEN
Solar/Wind Harmer
29.106
963791AG1-232 GEN
Solar/Wind Harmer
8.602
970031AG2-029 GEN
Solar/Wind Harmer
4.115
970065AG2-057 GEN
Solar/Wind Harmer
0.674
970077AG2-063 GEN
Solar/Wind Harmer
3.964
970149AG2-104 GEN
Solar/Wind Harmer
31.436
970153AG2-106 GEN
Solar/Wind Harmer
18.586
970155AG2-107 GEN
Solar/Wind Harmer
18.586
970179AG2-119 GEN
Solar/Wind Harmer
6.078
970191AG2-125 GEN
Solar/Wind Harmer
1.648
970217AG2-149 GEN
Solar/Wind Harmer
5.603
970245AG2-165 GEN
Solar/Wind Harmer
2.715
970321AG2-212 GEN
Solar/Wind Harmer
2.715
970329AG2-216 GEN
Solar/Wind Harmer
2.879
970349AG2-230 GEN
Solar/Wind Harmer
9.423
970373AG2-245 GEN
Solar/Wind Harmer
12.999
970513AG2-328 GEN
Solar/Wind Harmer
2.715
970515AG2-329 GEN
Solar/Wind Harmer
16.808
970517AG2-330 GEN
Solar/Wind Harmer
16.29
970593AG2-378 GEN
Solar/Wind Harmer
1.551
970605AG2-385 GEN
Solar/Wind Harmer
4.193
970611AG2-400 GEN
Solar/Wind Harmer
6.437
970621AG2-405 GEN
Solar/Wind Harmer
1.179
970623AG2-406 GEN
Solar/Wind Harmer
1.175
970627AG2-408 GEN
Solar/Wind Harmer
1.931
970689AG2-444 GEN
Solar/Wind Harmer
13.943
970707AG2-453 GEN
Solar/Wind Harmer
19.835
970833AG2-524 GEN
Solar/Wind Harmer
6.658
970833AG2-524 GEN
Solar/Wind Harmer
4.438
970883AG2-550 GEN
Solar/Wind Harmer
6.273
970885AG2-551 GEN
Solar/Wind Harmer
2.091
970905AG2-564 GEN
Solar/Wind Harmer
3.422
970941AG2-585 GEN
Solar/Wind Harmer
7.6
971029AG2-637 GEN
Solar/Wind Harmer
9.403
971199AH1-059 GEN
Solar/Wind Harmer
2.717
971201AH1-060 GEN
Solar/Wind Harmer
1.348
971231AH1-075 GEN
Solar/Wind Harmer
0.76
971347AH1-153 GEN
Solar/Wind Harmer
9.423
971549AH1-272 GEN
Solar/Wind Harmer
12.86
971567AH1-282 GEN
Solar/Wind Harmer
9.938
971605AH1-302 GEN
Solar/Wind Harmer
7.678
971609AH1-304 GEN
Solar/Wind Harmer
1.02
971611AH1-305 GEN
Solar/Wind Harmer
3.657
971617AH1-308 GEN
Solar/Wind Harmer
5.264
971619AH1-309 GEN
Solar/Wind Harmer
2.819
971653AH1-327 GEN
Solar/Wind Harmer
0.97
971655AH1-328 GEN
Solar/Wind Harmer
2.478
971677AH1-339 GEN
Solar/Wind Harmer
0.712
971769AH1-391 GEN
Solar/Wind Harmer
6.959
971771AH1-392 GEN
Solar/Wind Harmer
6.257
971917AH1-482 GEN
Solar/Wind Harmer
8.008
971989AH1-539 GEN
Solar/Wind Harmer
2.83
971995AH1-542 GEN
Solar/Wind Harmer
2.546
972037AH1-567 GEN1
Adder
0.16
972038AH1-567 GEN2
Adder
0.318
972057AH1-577 GEN
Solar/Wind Harmer
4.319
972059AH1-578 GEN
Solar/Wind Harmer
2.879
972159AH1-661 GEN
Adder
0.967
972173AH1-669 GEN
Solar/Wind Harmer
3.33
972227AH1-698 GEN1
Adder
2.272
972228AH1-698 GEN2
Adder
3.226
972239AH1-704 GEN
50/50
2.67
972259AH1-714 GEN
Adder
16.604
972269AH1-719 GEN
Adder
2.215
24441505OLIV SLR
Solar/Wind Harmer
0
270223U2-072_GEN1
Solar/Wind Harmer
0.001
270224U2-072_GEN2
Solar/Wind Harmer
0.001
270227U2-072_GEN3
Solar/Wind Harmer
0.001
270228U2-072_GEN4
Solar/Wind Harmer
0.001
270231U2-072_GEN5
Solar/Wind Harmer
0.001
270246TR4_N_V150
Solar/Wind Harmer
0.042
270247TR4_N_V136
Solar/Wind Harmer
0.042
276843GEN-1.7
Solar/Wind Harmer
0.197
940581AE2-045 GEN
Solar/Wind Harmer
-0.001
940611AE2-048 GEN
Solar/Wind Harmer
16.743
941391AE2-136 GEN
Solar/Wind Harmer
9.431
941551AE2-152 GEN
Solar/Wind Harmer
0
942051AE2-217 GEN
Solar/Wind Harmer
12.577
957201AF2-014 GEN
Solar/Wind Harmer
0
957741AF2-068 GEN
Solar/Wind Harmer
9.425
957841AF2-078 GEN
Solar/Wind Harmer
-0.001
957891AF2-083 GEN
Solar/Wind Harmer
0.001
958011AF2-095 GEN
Solar/Wind Harmer
8.755
958321AF2-126 GEN
Solar/Wind Harmer
0.812
958381AF2-132 GEN
Solar/Wind Harmer
0.001
958391AF2-133 GEN
Solar/Wind Harmer
0.001
964401AG1-302 GEN
Solar/Wind Harmer
0.001
964601AG1-323 GEN
Solar/Wind Harmer
2.785
964601AG1-323 GEN
Solar/Wind Harmer
1.857
964611AG1-324 GEN
Solar/Wind Harmer
0.47
964861AG1-349 GEN
Solar/Wind Harmer
-0.001
965011AG1-365 GEN
Solar/Wind Harmer
6.437
965021AG1-366 GEN
Solar/Wind Harmer
2.146
965041AG1-368 GEN
Solar/Wind Harmer
6.437
965051AG1-369 GEN
Solar/Wind Harmer
3.223
965101AG1-375 GEN
Solar/Wind Harmer
6.295
965421AG1-410 GEN
Solar/Wind Harmer
19.519
965651AG1-433 GEN
Solar/Wind Harmer
1.85
965681AG1-436 GEN
Solar/Wind Harmer
7.77
965791AG1-447 GEN
Solar/Wind Harmer
5.698
972301AH1-735 GEN
Adder
5.33
274811UNIV PK N;7U
Adder
4.378
274812UNIV PK N;8U
Adder
4.378
274814UNIV PK N;0U
Adder
4.416
CBM West 1LTFEXP_CBM-W1->PJM
CBM
123.087
CBM West 2LTFEXP_CBM-W2->PJM
CBM
94.63
CBM South 1LTFEXP_CBM-S1->PJM
CBM
24.222
CBM South 2LTFEXP_CBM-S2->PJM
CBM
6.332
NYPJM->LTFIMP_NY
CLTF
4.259
LGEELTFEXP_LGEE->PJM
CLTF
5.644
WECLTFEXP_WEC->PJM
CLTF
3.25
CPLELTFEXP_CPLE->PJM
CLTF
0.483
TVALTFEXP_TVA->PJM
CLTF
6.061
MECLTFEXP_MEC->PJM
CLTF
13.455
LAGNLTFEXP_LAGN->PJM
CLTF
12.385
SIGELTFEXP_SIGE->PJM
CLTF
0.424
AG2-052LTFEXP_AG2-052->PJM
LTF
0.204
AH1-155LTFEXP_AH1-155->PJM
LTF
0.306
CONTINGENCY 'AP_P1-2_WP-500-303T_SRT-A'
 DISCONNECT BRANCH FROM BUS 235104 TO BUS 200011 CKT 1   /*01CABOT      500.0 - KEYSTONE     500.0
END
235117 to 235111 ckt 1
242925 to 235117 ckt 1

Winter Peak Analysis

The New Service Request AH1-577 was evaluated as a 70.0 MW (42.0 MW Capacity) injection in the AEP area.

AH1-577 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 70.0 MW (70.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Light Load Analysis

The New Service Request AH1-577 was evaluated as a 70.0 MW injection

AH1-577 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 70.0 MW (70.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

(No impacts were found for this analysis)

Short Circuit Analysis

Short Circuit analysis is not performed as part of the Phase I System Impact Study. Short Circuit analysis will commence in the Phase II System Impact Study.

Stability Analysis

Stability analysis is not performed as part of the Phase I System Impact Study. Stability analysis will commence in the Phase II System Impact Study.

Reactive Power Analysis

Reactive Power analysis is not performed as part of the Phase I System Impact Study. Reactive Power analysis will commence in the Phase II System Impact Study.

Steady-State Voltage Analysis

Steady State Voltage Analysis is Not Required.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AA1-018Powerton-Goodings GroveIn Service
AA1-095Halfway-Marlowe 34.5kVIn Service
AB1-006Meadow Lake 345kVIn Service
AB1-096Carroll-Mt. Airy 34.5kVIn Service
AB1-124Carroll-Monocacy 34.5kVPartially in Service - Under Construction
AB1-125Carroll-Monocacy 34.5kVIn Service
AB1-127St. Thomas-Guilford 34.5kVIn Service
AB1-128St. Thomas-Mercersburg 34.5kVIn Service
AB2-067Kammer-Vassell 765kVIn Service
AB2-093Ormet 138kVIn Service
AB2-170East Lima-Marysville 345kVIn Service
AC1-001Delano 138kVIn Service
AC1-044Kammer-Vassell 765kVIn Service
AC1-068Atlanta 69kV IIn Service
AC1-069Atlanta 69kV IIIn Service
AC1-078Beatty-London 138kVIn Service
AC1-085Stuart-Clinton 345kVIn Service
AC1-089Hillsboro-Wildcat 138kVIn Service
AC1-111Aurora 138kVIn Service
AC1-165Atlanta 69kV IIIIn Service
AC1-166Atlanta 69kV IVIn Service
AC1-167Mark Center 69kVUnder Construction
AC1-174Losantville 345kVIn Service
AC1-175Losantville 345kVIn Service
AC1-188Rio-Lick 138kVEngineering & Procurement
AC1-194Elk 138kVActive
AC2-015Chatfield-Howard 138kVPartially in Service - Under Construction
AC2-029Circleville 138kVSuspended
AC2-044Maddox Creek 345kVSuspended
AC2-059Biers Run-Circleville 138kVIn Service
AC2-060Buckskin 69kVIn Service
AC2-061Hillsboro-Clinton 138kVIn Service
AC2-067Camden-Crystal I 69kVEngineering & Procurement
AC2-068Camden-Crystal II 69kVEngineering & Procurement
AC2-088S. Bethel-Brown 69kVIn Service
AC2-090Losantville 345kVIn Service
AC2-111College Corner 138kVEngineering & Procurement
AC2-136East Hagerstown 12kVUnder Construction
AC2-176Jay 138 kVIn Service
AC2-195Galion-Roberts South 138 kVUnder Construction
AD1-060Mercersburg-Milnor 34.5 kVIn Service
AD1-061McConnelsburg-Mercersburg 34 kVIn Service
AD1-100Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kVUnder Construction
AD1-101Continental 69 kVIn Service
AD1-106North Waldo-Wild Creek 138 kVSuspended
AD1-119Payne 69 kVIn Service
AD1-128Modoc-Delaware 138 kVPartially in Service - Under Construction
AD1-130Hardin Switch 345 kVIn Service
AD1-136South Bethel-Brown 69 kVIn Service
AD1-140Greene-Clark 138 kVEngineering & Procurement
AD1-155Meadow Brook-Strasburg 138 kVIn Service
AD2-009McConnellsburg 138 kVIn Service
AD2-016Biers Run-Circleville 138 kVIn Service
AD2-020Valley 138 kVEngineering & Procurement
AD2-031Martinsville-Wilmington 69 kVIn Service
AD2-038Powerton-Nevada 345 kVUnder Construction
AD2-047Davis Creek 138 kVSuspended
AD2-060Davis Creek 138kVEngineering & Procurement
AD2-066Mazon-Crescent Ridge 138 kVEngineering & Procurement
AD2-067Centerburg 138kVEngineering & Procurement
AD2-071Strawton-Deer Creek 138 kVSuspended
AD2-079Capitol Ave 34.5kVIn Service
AD2-086Hardin Switch 345 kVIn Service
AD2-092Marysville 345kVUnder Construction
AD2-093Marysville 345kVUnder Construction
AD2-096Marysville 345kVSuspended
AD2-163Broadview-Tangy 138 kVIn Service
AD2-180Elk Garden-Parr Run 138kVIn Service
AE1-040Greenfield 69 kVIn Service
AE1-090Hardin Switch 345 kVIn Service
AE1-091West Newton-Lynn 138 kVSuspended
AE1-092Blue Jacket-Kirby 138 kVActive
AE1-101McConnellsburg-Texas Eastern 138 kVIn Service
AE1-102Maddox Creek 345 kVSuspended
AE1-109Frenchs Mill 34 kVIn Service
AE1-146Ebersole #2-Fostoria Central 138 kVUnder Construction
AE1-166Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kVEngineering & Procurement
AE1-170Kenzie Creek-Colby 138 kVSuspended
AE1-172Loretto-Wilton CenterActive
AE1-207Mississinewa-Gaston 138 kVSuspended
AE1-208Delaware-Van Buren 138 kVSuspended
AE1-209Desoto 345 kVSuspended
AE1-210Desoto 345 kVSuspended
AE1-227South Cumberland 69 kVSuspended
AE1-245Haviland 138 kVUnder Construction
AE2-045Olive-Reynolds 345 kVEngineering & Procurement
AE2-048Muskingum-W. Millersport 345 kVEngineering & Procurement
AE2-054Warfordsburg 34 kVIn Service
AE2-072East Leipsic-Richland 138 kVIn Service
AE2-089Pennville-Adams 138 kVEngineering & Procurement
AE2-136Muskingum River-W. Millersport 345 kVEngineering & Procurement
AE2-148Beatty-Greene 345 kVIn Service
AE2-152Loretto-Wilton 345 kV & Braidwood-Davis Creek 345 kVEngineering & Procurement
AE2-169Delaware-Van Buren 138 kVSuspended
AE2-172Mississinewa-Gaston 138 kVSuspended
AE2-181Snyder 69kVUnder Construction
AE2-206East Sidney-Quincy 138 kVIn Service
AE2-214Cole 345 kVEngineering & Procurement
AE2-217East Springfield-London 138 kVEngineering & Procurement
AE2-219Bluff Point-Randolph 138 kVSuspended
AE2-220Losantville 345 kVEngineering & Procurement
AE2-221Clinton-Stuart 345 kVUnder Construction
AE2-226Millville-Old Chapel 138 kVEngineering & Procurement
AE2-230Bartonsville-Meadow Brook 138 kVIn Service
AE2-234Liberty Center-Buckeye Tap 69 kVEngineering & Procurement
AE2-236Columbia-Northeast 138 kVSuspended
AE2-267Woodsdale 345 kVEngineering & Procurement
AE2-282East Fayette 138 kVIn Service
AE2-297Madison-Tanners Creek 138 kVIn Service
AE2-305Givens-Mechanicsburg 138 kVEngineering & Procurement
AE2-309Carlos Junction-Lonaconing 34.5 kVIn Service
AE2-315Yankee Tap 69 kVIn Service
AE2-318Ford-Cedarville 138 kVSuspended
AE2-323Twin Branch-Guardian 138 kVUnder Construction
AE2-325Valley 138 kVActive
AE2-341Sandwich-Plano 138 kVActive
AE2-342Woodstock 69 kVEngineering & Procurement
AF1-030Sandwich-Plano 138 kVActive
AF1-045Cedarville-Ford 138 kVSuspended
AF1-053Givens-Mechanicsburg 138 kVEngineering & Procurement
AF1-054Givens-Mechanicsburg 138 kVEngineering & Procurement
AF1-062Jug Street 138 kVEngineering & Procurement
AF1-064Weston 69 kVUnder Construction
AF1-078East Sidney-Quincy 138 kVIn Service
AF1-091Varner - Sowers 138 kVEngineering & Procurement
AF1-092Huntington Jct. 138 kVSuspended
AF1-118Sorenson-Desoto 345 kVEngineering & Procurement
AF1-119Keystone-Desoto 345 kVEngineering & Procurement
AF1-120East Fayette 2 138 kVIn Service
AF1-122Cardington-Liberty 69 kVSuspended
AF1-136Warfordsburg-Purcell Junction 34.5 kVEngineering & Procurement
AF1-158Edison-Gravel Pit 138 kVIn Service
AF1-176Corey 138 kVActive
AF1-202Keystone-Desoto 345 kVUnder Construction
AF1-205Napoleon Muni 138 kVSuspended
AF1-206East Fayette 138 kVEngineering & Procurement
AF1-207Reynolds-Olive #1 345 kVEngineering & Procurement
AF1-215Olive-Reynolds 345 kVIn Service
AF1-223Keystone-Desoto 345 kVUnder Construction
AF1-227Marysville – Gunn Road 345 kVIn Service
AF1-228Beatty-Greene 345 kVEngineering & Procurement
AF1-229Galion-South Berwick 345 kVEngineering & Procurement
AF1-249Nickel 12.47 kVIn Service
AF1-254Milnor-Huyetts 34.5 kVUnder Construction
AF1-268Desoto-Jay 138 kVEngineering & Procurement
AF1-282Stuart-Clinton 345 kVEngineering & Procurement
AF1-283Stuart-Clinton 345 kVEngineering & Procurement
AF1-285Gunn Road 345 kVUnder Construction
AF1-290Feagans Mill-Millville 138 kVIn Service
AF1-291ABartonsville-Meadow Brook 138 kVIn Service
AF1-322Meadow Lake 345 kVEngineering & Procurement
AF2-014Maddox Creek 345 kVEngineering & Procurement
AF2-068Jay 138 kVActive
AF2-075Bartonsville-Meadow Brook 138 kV IIIIn Service
AF2-078Reynolds-Olive #1 345 kVEngineering & Procurement
AF2-083Kenzie Creek-Stone Lake 69 kVUnder Construction
AF2-095Davis Creek 138 kVActive
AF2-111North Clark-Spurlock 345 kVActive
AF2-122Kirk 138 kVUnder Construction
AF2-126Weston 69 kV IIActive
AF2-132Reynolds-Olive #1 345 kVUnder Construction
AF2-133Reynolds-Olive #2 345 kVUnder Construction
AF2-134Olive-Reynolds #2 345 kVIn Service
AF2-142Nevada 345 kVActive
AF2-143Powerton-Nevada 345 kVActive
AF2-173Desoto 345 kVActive
AF2-177Sorenson-DeSoto #2 345 kVActive
AF2-205Olive-Reynolds #2 345 kVEngineering & Procurement
AF2-224Allen 345 kVEngineering & Procurement
AF2-291Sporn South-Leon 138 kVEngineering & Procurement
AF2-298Crown-New Lebanon 69 kVEngineering & Procurement
AF2-335Delaware-Royerton 138 kVActive
AF2-350Kensington 138 kVActive
AF2-356Albright-Mt. Zion 138 kVUnder Construction
AF2-359Olive-University Park 345 kVEngineering & Procurement
AF2-375Ebersole-Fostoria 138 kVEngineering & Procurement
AF2-388Keystone-Desoto 345 kVActive
AF2-396Stinger 138 kVActive
AG1-024Centerburg 138 kVEngineering & Procurement
AG1-034Centerburg 138 kVEngineering & Procurement
AG1-047Jay 138 kVEngineering & Procurement
AG1-107Hillsboro-Middleboro 138 kVEngineering & Procurement
AG1-125Marysville-Flatlick 765 kVEngineering & Procurement
AG1-126Marysville-Flatlick 765 kVEngineering & Procurement
AG1-226Dequine-Eugene 345 kVActive
AG1-232Magley 138 kVEngineering & Procurement
AG1-237Dequine-Eugene 345 kVEngineering & Procurement
AG1-302Olive-Reynolds #1 345 kVUnder Construction
AG1-323Blue Jacket 138 kVActive
AG1-324Jay-Desoto 138 kVEngineering & Procurement
AG1-349Olive-Reynolds #2 345 kVEngineering & Procurement
AG1-363Black Oak-Hatfield 500 kVEngineering & Procurement
AG1-365Allen 345 kVEngineering & Procurement
AG1-366Allen 345 kVEngineering & Procurement
AG1-367DeSoto 345 kVActive
AG1-368Tillman 138 kVEngineering & Procurement
AG1-369Logtown 138 kVEngineering & Procurement
AG1-375Sorenson-Desoto 345 kVActive
AG1-410Maddox Creek-RP Mone 345 kVActive
AG1-433Keystone-DeSoto 345 kVActive
AG1-436Olive-University Park 345 kVActive
AG1-447Olive-University Park 345 kVActive
AG1-478Wilmington 34.5 kVEngineering & Procurement
AG1-555Dequine 345 kVEngineering & Procurement
AG2-029Forest G. Hipple-Collingwood 345 kVActive
AG2-057Cardington-Liberty 69 kV IIActive
AG2-063North Hampton 69 kVActive
AG2-085Delaware-Royerton 138 kVActive
AG2-104Marysville-Flatlick 765 kVActive
AG2-106Marysville-Flatlick 765 kVActive
AG2-107Marysville-Flatlick 765 kVActive
AG2-119Galion-Roberts South 138 kV IIActive
AG2-125Camden-Crystal 69 kVActive
AG2-149Galion-South Berwick 345 kVActive
AG2-162Jefferson-Greentown 765 kVActive
AG2-163Dequine-Eugene 345 kVActive
AG2-164Jefferson-Greentown 765 kVActive
AG2-165Dumont-Greentown 765 kVActive
AG2-191Mississinewa 138 kVActive
AG2-192Mississinewa 138 kVActive
AG2-212Dumont-Greentown 765 kVActive
AG2-216East Sidney-Quincy 138 kVActive
AG2-219Jefferson-Greentown 765 kVActive
AG2-230Dumont 345 kVActive
AG2-245Olive - Reynolds #1 345 kVActive
AG2-328Dumont - Greentown 765 kVActive
AG2-329S Berwick - Galion 345 kVActive
AG2-330Dumont - Greentown 765 kVActive
AG2-331Jefferson-Greentown 765 kVActive
AG2-378North Hampton – Medway 69 kVActive
AG2-385North Hampton 69 kVActive
AG2-400Allen 345 kVActive
AG2-401Losantville 345 kVActive
AG2-405Continental 69 kVActive
AG2-406Payne 69 kVActive
AG2-408Allen 345 kVActive
AG2-444Bixby - Biers Run 345 kVActive
AG2-449Jefferson-Greentown 765 kVActive
AG2-453Lasalle - Plano 345 kVActive
AG2-487Madison - Tanners Creek 138 kVActive
AG2-491Meadow Lake 345 kVActive
AG2-519Royerton - Desoto 138 kVActive
AG2-524LaSalle Station - Mazon 138 kVActive
AG2-548Corwin - Elk 138 kVActive
AG2-550Bluff Point - Randolph 138 kVActive
AG2-551Bluff Point - Randolph 138 kVActive
AG2-564Sulphur Springs 138 kVActive
AG2-585Kensington 138kVActive
AG2-637Randolph - Hodgin 138 kVActive
AG2-665Corwin - Elk 138 kVActive
AH1-055Kyger Creek - Don Marquis 345 kVActive
AH1-059Sharp Road 69 kVActive
AH1-060Cardington-Liberty 69 kV IIIActive
AH1-075North Waldo - Wild Creek 138 kVActive
AH1-153Dumont 345 kVActive
AH1-272Argenta - Twin Branch 345 kVActive
AH1-282Galion - Ohio Central 345 kVActive
AH1-285Sandwich 138 kVActive
AH1-302Olive - Reynolds 345 kVActive
AH1-304Delaware-Van Buren 138 kVActive
AH1-305Olive - Reynolds 345 kVActive
AH1-306Mississinewa-Gaston 138 kVActive
AH1-308Pennville - Adams 138 kVActive
AH1-309Kenzie Creek-Colby 138 kVActive
AH1-327Hardin Switch 345 kVActive
AH1-328Blue Jacket - Kirby 138 kVActive
AH1-337Randolph - Hodgin 138 kVActive
AH1-339West Crawford 69 kVActive
AH1-391Olive 138 kVActive
AH1-392Gravel Pit-Kankakee 138 kVActive
AH1-482Olive - Reynolds #2 345 kVActive
AH1-537Pierce - Kyger Creek 345 kVActive
AH1-539South Kenton 138 kVActive
AH1-542Crissinger-Kirby 138kVActive
AH1-567University Park 138 kVActive
AH1-578Clutch 69 kVActive
AH1-661Cannelville 12.47 kVActive
AH1-669Circleville-Biers Run 138 kVActive
AH1-698Braidwood 345 kVActive
AH1-704Hannibal 138 kVActive
AH1-714Lasalle 345 kVActive
AH1-719Beverly 345 kVActive
AH1-735Richland 138 kVActive
U2-030Four Mile Ridge Wind 138kVIn Service
U2-072East Lima-Marysville 345kVIn Service
U2-073Frostburg 138kV IIIn Service
V1-011Haviland 138kVIn Service
V3-007Desoto-Tanners Creek #1 345kVIn Service
W1-056Ada-Dunkirk 69kVIn Service
X1-042WatervlietIn Service
X3-005Wildwood 12kVIn Service
Y3-023Country Side 12kVIn Service
Y3-024Bluff Point 12kVIn Service
Z2-115Deer Creek 12.47kVIn Service
Z2-116Twin Branch 12.47kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In Phase I of the Cycle, PJM conducts an Affected System screen to identify any New Service Request with potential Affected System impacts. PJM initiates coordination with each Affected System Operator by providing a list of New Service Requests in the Cycle with potential impacts to their respective system. If the Affected System Operator indicates an Affected System Study is required, PJM will notify the Project Developer or Eligible Customer of the need for an Affected System Study. See below if any Affected System Operator requires a study for this project:

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

No cost allocated system reinforcements were identified for this project in the Phase I System Impact Study load flow analysis.

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: b4000.11
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.11
Title
Expand Black Oak Substation & Loop in the 502 Jct-Woodside 500 kV line (Projected ISD 6/1/2029)
Description
Expand Black Oak Substation to accommodate the connection of the 502 Jct-Woodside 500 kV line and loop the 502 Jct-Woodside 500 kV line into the Black Oak substation by constructing ~0.85 miles of new 500 kV line into and out of Black Oak 500 kV substation
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.7
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.7
Title
Construct a new 86 miles Welton Spring to Rocky Point 765 kV line - in DVP local area/Millville to Lovettsville section, roughly 10.5 miles (Projected ISD 6/1/2029)
Description
765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.10
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.10
Title
Install four 250 MVAR cap banks (two on 765 and two on 500 kV side) and a +/-500 MVAR STATCOM on the 765 kV Rocky Point yard
Description
765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.1
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b4000.1
Title
Add two 765 kV breakers at Amos Substation to expand the breaker and a half scheme to accommodate the new Amos-Welton Spring 765 kV line (Projected ISD 6/1/2029)
Description
765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.4
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.4
Title
Construct a new 765 kV switchyard - Welton Spring (Projected ISD 6/1/2029)
Description
765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.8
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.8
Title
Construct a new 86 miles Welton Spring to Rocky Point 765 kV line (DVP local area to Rocky Point, roughly 4.8 miles)
Description
765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.2
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.2
Title
Construct a new 175 miles Amos to Welton Spring 765 kV line - AEP Section of the line is 30 miles (Projected ISD 6/1/2029)
Description
765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.5
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.5
Title
Install four 250 MVAR shunt capacitors, and a +/-500 MVAR STATCOM at Welton Spring 765 kV substation
Description
765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.9
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.9
Title
Construct a new substation called Rocky Point with a 765 kV and a 500 kV yard (Projected ISD 6/1/2029)
Description
Construct a new substation called Rocky Point with a 765 kV and a 500 kV yard. Loop in the Doubs-Goose Creek 500 kV line, the Doubs-Aspen 500 kV line, and the Woodside-Goose Creek 500 kV line. Install two 765/500 kV transformer at Rocky Point substation. 765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.6
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.6
Title
Construct a new 86 miles Welton Spring to Rocky Point 765 kV line (Welton Spring to DVP local area, roughly 21 miles) (VA Portion)
Description
765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

System Reinforcement: b4000.3
Type
Load Flow
TO
APS
RTEP ID / TO ID
b4000.3
Title
Construct a new 175 miles Amos to Welton Spring 765 kV line - APS/FE Section of the line is 145 miles (Projected ISD 6/1/2029)
Description
765kV Solution: 2024 W1 Solution - Regional Cluster Ties Doubs 500kV area to John Amos 765kV via a new 765kV line
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AH1-577 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AH1-577 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
01 502 J-01KAMMER 500.0 kV Ckt 1 line(Any)
01KAMMER-05KAMMER 500.0/765.0 kV Ckt 1 transformer(Any)

Attachments

AH1-577 One Line Diagram

AH1-577 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.