AG2-240 Phase II System Impact Study Report

v1.00 released 2026-06-03 17:44

Old Church 34.5 kV

0.0 MW Capacity / 0.0 MW Energy

Introduction

This Phase II System Impact Study (SIS) Report has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 310 for New Service Requests (projects) in Transition Cycle 2 (TC2). The Project Developer/Eligible Customer (developer) is Mechanicsville Solar, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Virginia Electric and Power Company (d/b/a Dominion Energy Virginia).

Preface

The Phase II System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Phase II System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.5, PJM takes the following actions during the Phase II System Impact Study:

  1. PJM will retool load flow results from the Phase I System Impact Study (summer peak, winter peak and light load) based on decisions made by Project Developers or Eligible Customers during Decision Point I.
  2. PJM will conduct any required voltage analyses.
  3. PJM will perform short circuit and stability analyses as required.
  4. PJM will coordinate with the Affected System to confirm which projects in the PJM Cycle will require Affected System studies. If the Affected System Operator indicates that an Affected System study is required, PJM will:
    1. Notify the Project Developer or Eligible Customer of the need for an Affected System study and the requirement to execute an Affected System study agreement with the impacted Affected System Operator, and;
    2. Include the results of the Affected System Operator’s Affected System Study in the Phase II System Impact Study results, if applicable and available.
  5. The Phase II System Impact Study Results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.

The Transmission Owner takes the following actions during the Phase II System Impact Study:

  1. Verify Interconnection Facilities and Network Upgrades required to accommodate the New Service Request.
  2. Perform a Facilities Study. The Facilities Study in Phase II System Impact Study phase will be for the physical Interconnection Facilities. The Facilities Study requirements are outlined in Attachment C of this manual. The study will be conducted pursuant to Tariff, Part VII, Subpart D, section 307(A)(7) and Tariff, Part VIII, Subpart C, section 404(A)(7).

Decision Point II Requirements

At the close of Phase II System Impact Study, PJM will initiate Decision Point II (DP2). During DP2, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.A. Additional information on these elements is available in PJM Manual 14H sections 4.6, 6, and 7.

Allowable project modifications at Decision Point II are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

Adverse Test Eligibility

This New Service Request does not meet the Adverse Study Impact Criteria and has the option to either move forward in the Cycle process or withdraw at DP2 with Readiness Deposit #1 forfeited. See adverse study impact calculation below.

This section details whether a Project Developer or Eligible Customer qualifies for the Adverse Study Impact clause outlined in the PJM OATT, Part VII, Subpart D, section 311.B and Manual 14H, section 6.2.2. In order to qualify for an Adverse Study Impact at Decision Point II, the Network Upgrade cost from Phase I to Phase II must:

  1. Increase overall by 25% or more
  2. Increases by more than $10,000 per MW (Includes Costs identified in Affected System studies)

If a New Service Request meets the criteria above and chooses to withdraw the request, PJM will refund the cumulative Readiness Deposit amounts paid at the Application Phase and at Decision Point I (RD1 and RD2, respectively).

The below calculations show the computation of this New Service Request's Adverse Study Impact

DP2 Adverse Eligibility = DP2 Adverse Cost Alloc DP1 Adverse Cost Alloc > 1.25 AND ( DP2 Adverse Cost Alloc - DP1 Adverse Cost Alloc ) Project Size > $10,000 per MW
DP2 Adverse Eligibility = $0 $0 = ∞ AND ( $0 - $0 ) 0.0 = ∞

General

The Project Developer has proposed an uprate to a planned/existing Solar facility located in the Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) zone — Hanover County, Virginia. This project is an increase to the developer’s AB1-027/AE2-155 project(s), which will share the same Point of Interconnection. The AG2-240 project is a 0.0 MW uprate (0.0 MW Capacity uprate) to the previous project(s). The total installed facilities will have a capability of 25.0 MW with 17.5 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG2-240
Project Name:
Old Church 34.5 kV
Project Developer Name:
Mechanicsville Solar, LLC
State:
Virginia
County:
Hanover
Transmission Owner:
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
MFO:
25.0
MWE:
0.0
MWC:
0.0
Battery Storage Specification:
45.0 MWh, 4.0-hr class
Grid Charging:
Yes
Fuel Type:
Storage
Basecase Study Year:
2028

Physical Interconnection Facility Study

Not Required

A Physical Interconnection Facilities Study is not required for this project.

Point of Interconnection

AG2-240 will interconnect on the Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) distribution system at Old Church 34.5 kV Substation circuit number 474.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In Phase II SIS, the interconnected Transmission Owner has performed a facilities study for both the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades. The System Reliability Network Upgrade shown in the table are planning level cost estimates which are subject to change as a result of a facility study performed by the TO during Phase III System Impact Study.

Based on the Phase II SIS results, the AG2-240 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit #3 are also shown below.

Cost Summary
DescriptionCost Allocated to AG2-240Cost Subject to Readiness*Cost Subject to Adverse
Transmission Owner Interconnection Facilities (TOIF)$0$0$0
Other Scope$0$0$0
Option To Build Oversight$0$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0$0
Network Upgrades$0$0$0
System Reliability Network Upgrades
Steady State Thermal & Voltage$0$0$0
Transient Stability$0$0$0
Short Circuit$0$0$0
Transmission Owner Analysis
SubRegional$0$0$0
Distribution$0$0$0
Affected System Reinforcements
AFS - PJM Violations$0$0$0
AFS - Non-PJM Violations$0$0$0
Total$0$0$0

* Contributes to calculation for Readiness Deposit #3 (RD3). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Note 4: Please see the ‘Affected Systems Studies’ section of this Phase II SIS report for details on your project’s need for an Affected Systems Study. If your project requires an Affected Systems Study, the Affected Systems impacts may not be available from the Affected System Operator at the time of the PJM Phase II SIS. Therefore, the cost in this section would not reflect any required upgrades by the Affected System until the study is completed. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 311 (Decision Point II) A.1.b and PJM Manual 14H, section 6.2, Readiness Deposit #3 (RD3) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point II (DP2), the Project Developer or Eligible Customer is required to submit Readiness Deposit #3, which is calculated as 20% of cost allocation for required Phase II Network Upgrades minus Readiness Deposit #1 & Readiness Deposit #2.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Note 4: Readiness Deposit #3 can be zero, but may not be a negative number.

Readiness Deposit #3 Due for Project AG2-240

Readiness Deposit #3 has been calculated for the project based on the Phase II System Impact Study results and is shown in the table below. This Readiness Deposit #3 must be provided at Decision Point II through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit #3 Due for AG2-240
Project ID: AG2-240
20% of cost allocation for Phase II Network Upgrades:(A) $0
Sum of Readiness Deposit #1 & Readiness Deposit #2 Received:(B) $45,000
Readiness Deposit #3 (RD3) due at DP2:(A) - (B) = $0
Note: Failure to provide an acceptable form of Readiness Deposit #3 by the end of Decision Point II will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

No TO Interconnection Facilities or Physical Network Upgrades are required for this project.

The costs associated with interconnecting to the Dominion distribution system will be documented in the two-party Interconnection Agreement between the Project Developer and the Transmission Owner. The Project Developer will need to coordinate with the Transmission Owner for scope, cost and schedule for this physical interconnection. This PJM report identifies the effects on the transmission system.

Transmission Owner Analysis

PJM performed a power flow analysis of the transmission system using a 2028 load flow model and the results were verified by Dominion.

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. Dominion interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AG2-240 was evaluated as a 0.0 MW (0.0 MW Capacity) injection in the Dominion area.

AG2-240 was evaluated as part of a plant. The plant consists of AG2-240. The total Energy output of the plant was evaluated at its maximum seasonal capability of 25.0 MW (0.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Winter Peak Analysis

The New Service Request AG2-240 was evaluated as a 0.0 MW (0.0 MW Capacity) injection in the Dominion area.

AG2-240 was evaluated as part of a plant. The plant consists of AG2-240. The total Energy output of the plant was evaluated at its maximum seasonal capability of 25.0 MW (0.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Light Load Analysis

The New Service Request AG2-240 was evaluated as a 0.0 MW injection and 11.25 MW withdrawal in the Dominion area.

AG2-240 was evaluated as part of a plant. The plant consists of AG2-240. The total Energy output of the plant was evaluated at its maximum seasonal capability of 25.0 MW (10.92 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2AEP
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
AEP_P4_#7422_05CLOVRD 500_EE2_SRT-A
BreakerAC173.68 %1180.0B2049.45
1.25
GD2AEP
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
DVP_P4-2: 56602_SRT-A
BreakerAC173.67 %1180.0B2049.35
1.25
GD2AEP
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
DVP_P4-2: 547T566_SRT-L
BreakerAC173.35 %1180.0B2045.56
1.25
GD2AEP
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
AEP_P1-2_#7422_16_SRT-A
SingleAC171.54 %1180.0B2024.13
1.25
GD2AEP
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
AP_P2-3_PE-765-237805-SB3_SRT-SL_SENS
BreakerAC138.39 %1180.0B1632.98
1.15
GD2AEP
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
AP_P2-3_PE-765-237805-SB4_SRT-SL_SENS
BreakerAC138.39 %1180.0B1632.98
1.15
GD2AEP
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
AP_P1-2_PE-765-242508-237805_SRT-A_SENS
SingleAC136.83 %1180.0B1614.63
1.15

Details for 05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line l/o AEP_P4_#7422_05CLOVRD 500_EE2_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
Contingency Name:
AEP_P4_#7422_05CLOVRD 500_EE2_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:173.68 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:2049.45
MW Contribution:
1.25
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeMW Contribution
316075AC2-137 C
Solar/Wind Helper
0.581
316077AC2-138 C
Solar/Wind Helper
0.394
316059AD1-063 C
Solar/Wind Helper
0.418
316159AE1-175 C
Solar/Wind Helper
0.538
316258AE1-075 C
Solar/Wind Helper
0.519
316303AF2-085
50/50
Charging
2.243
316314AB2-024 C
Solar/Wind Helper
0.561
316382AG1-145 C
Solar/Wind Helper
0.541
316405AF2-144 C
Solar/Wind Helper
0.49
316405AF2-144 C
50/50
Charging
1.174
316404AE1-155 C
Solar/Wind Helper
3.563
316203AE2-005 GEN
Solar/Wind Helper
3.616
316441AF1-014 GEN
Solar/Wind Helper
0.553
315616AA1-038_C
Solar/Wind Helper
1.957
316312AB1-027
Solar/Wind Helper
0.748
315651AD1-115 GEN
Solar/Wind Helper
4.201
315821AE2-092 GEN
Solar/Wind Helper
3.827
315662AE1-191 GEN
Solar/Wind Helper
2.22
315666AE1-190 GEN
Solar/Wind Helper
0.555
316280AD1-041 GEN
Solar/Wind Helper
1.388
316473AC1-191 GEN
Solar/Wind Helper
2.427
316447AC1-158 HLD
Solar/Wind Helper
5.08
316044AC1-158 PL1
Solar/Wind Helper
2.309
316045AC1-158 PL2
Solar/Wind Helper
7.388
316450AC1-158 RIC
Solar/Wind Helper
0.616
316468AD1-105 GEN
Solar/Wind Helper
2.225
316156AD2-030 GEN
Solar/Wind Helper
0.548
316337AD2-073 GEN
Solar/Wind Helper
0.563
316313AB2-026
Solar/Wind Helper
0.577
270399AC1-101 GEN
Solar/Wind Harmer
1.686
270400AC1-102 GEN
Solar/Wind Harmer
1.686
270583AD2-179 GEN
Solar/Wind Harmer
12.447
270494AE1-108_GEN
Solar/Wind Helper
5.579
270346AE1-212 GEN
Solar/Wind Harmer
8.186
270030AE2-140 GEN
Solar/Wind Harmer
17.484
270069AE2-166 C O1
Solar/Wind Harmer
8.427
316006AB2-029 C
Solar/Wind Helper
0.541
316192AB2-158 GEN
Solar/Wind Helper
2.765
316164AC1-076 GEN
Solar/Wind Helper
1.94
316223AC1-118
Solar/Wind Helper
0.567
315975AC1-164 GENB
Solar/Wind Helper
0.061
315976AC1-164 GENA
Solar/Wind Helper
2.054
316169AC1-164_GENC
Solar/Wind Helper
1.775
316233AE1-074 FULL
Solar/Wind Helper
0.6
943031AE2-326 GEN
Solar/Wind Harmer
11.709
943811AF1-049 GEN
Solar/Wind Harmer
0
944491AF1-114 GEN
Solar/Wind Helper
2.856
960911AF2-382 GEN
Solar/Wind Harmer
6.617
961951AG1-038 GEN
Solar/Wind Helper
1.258
963031AG1-152 GEN
50/50
Charging
10.85
966871AG1-558 GEN
Solar/Wind Helper
0.436
966881AG1-559 GEN
Solar/Wind Helper
0.447
970119AG2-088 GEN
50/50
Charging
16.823
970281AG2-184 GEN
Solar/Wind Harmer
15.747
970417AG2-272 GEN
50/50
8.428
970563AG2-360 GEN
50/50
45.019
970823AG2-518 GEN
50/50
19.371
970913AG2-568 GEN
Solar/Wind Harmer
5.92
971225AH1-072 GEN
Solar/Wind Harmer
1.625
971227AH1-073 GEN
Solar/Wind Harmer
1.625
971277AH1-098 GEN
Solar/Wind Harmer
4.558
971277AH1-098 GEN
Solar/Wind Harmer
4.144
971313AH1-133 GEN
Solar/Wind Harmer
6.407
971329AH1-144 GEN
Solar/Wind Harmer
7.833
971331AH1-145 GEN
Solar/Wind Harmer
17.216
971403AH1-188 GEN
Solar/Wind Harmer
10.665
971461AH1-227 GEN
Solar/Wind Harmer
4.169
971507AH1-251 GEN
50/50
Charging
5.863
971531AH1-263 GEN
50/50
Charging
23.667
971543AH1-269 GEN
50/50
11.498
971687AH1-348 GEN
Solar/Wind Harmer
0.807
941621AE2-160 GEN
50/50
6.64
957191AF2-013 GEN
50/50
Charging
10.655
957601AF2-054 GEN
Solar/Wind Helper
0.551
957971AF2-091 GEN
Solar/Wind Helper
0.971
964211AG1-282 GEN
Solar/Wind Helper
0.564
966001AG1-469 GEN
Solar/Wind Helper
0.423
966391AG1-508 GEN
Solar/Wind Harmer
10.239
971981AH1-535 GEN
Solar/Wind Harmer
6.611
971981AH1-535 GEN
Solar/Wind Harmer
7.212
972103AH1-617 GEN
Solar/Wind Harmer
14.997
972273AH1-721 GEN
50/50
85.07
958121AF2-106 GEN
Solar/Wind Harmer
0
970365AG2-240 GEN
50/50
Charging
1.246
971881AH1-461 GEN
50/50
14.324
972293SS25-0014
50/50
Charging
57.012
316487AF1-042 GEN
Solar/Wind Helper
1.165
316484AD2-074 GEN
Solar/Wind Helper
2.227
CBM West 1LTFEXP_CBM-W1->PJM
CBM
105.883
CBM West 2LTFEXP_CBM-W2->PJM
CBM
115.004
CBM South 1LTFEXP_CBM-S1->PJM
CBM
35.022
CBM South 2LTFEXP_CBM-S2->PJM
CBM
22.666
NYPJM->LTFIMP_NY
CLTF
2.179
LGEELTFEXP_LGEE->PJM
CLTF
5.763
WECLTFEXP_WEC->PJM
CLTF
2.894
CPLELTFEXP_CPLE->PJM
CLTF
4.752
TVALTFEXP_TVA->PJM
CLTF
9.526
MECLTFEXP_MEC->PJM
CLTF
13.346
LAGNLTFEXP_LAGN->PJM
CLTF
17.994
SIGELTFEXP_SIGE->PJM
CLTF
0.438
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
24.507
AG2-052LTFEXP_AG2-052->PJM
LTF
0.174
AH1-155LTFEXP_AH1-155->PJM
LTF
0.26

Details for 05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line l/o DVP_P4-2: 56602_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 56602_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:173.67 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:2049.35
MW Contribution:
1.25
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeMW Contribution
316075AC2-137 C
Solar/Wind Helper
0.581
316077AC2-138 C
Solar/Wind Helper
0.394
316059AD1-063 C
Solar/Wind Helper
0.418
316159AE1-175 C
Solar/Wind Helper
0.538
316258AE1-075 C
Solar/Wind Helper
0.519
316303AF2-085
50/50
Charging
2.243
316314AB2-024 C
Solar/Wind Helper
0.561
316382AG1-145 C
Solar/Wind Helper
0.541
316405AF2-144 C
Solar/Wind Helper
0.49
316405AF2-144 C
50/50
Charging
1.175
316404AE1-155 C
Solar/Wind Helper
3.563
316203AE2-005 GEN
Solar/Wind Helper
3.616
316441AF1-014 GEN
Solar/Wind Helper
0.554
315616AA1-038_C
Solar/Wind Helper
1.962
316312AB1-027
Solar/Wind Helper
0.748
315651AD1-115 GEN
Solar/Wind Helper
4.201
315821AE2-092 GEN
Solar/Wind Helper
3.827
315662AE1-191 GEN
Solar/Wind Helper
2.22
315666AE1-190 GEN
Solar/Wind Helper
0.555
316280AD1-041 GEN
Solar/Wind Helper
1.388
316473AC1-191 GEN
Solar/Wind Helper
2.427
316447AC1-158 HLD
Solar/Wind Helper
5.08
316044AC1-158 PL1
Solar/Wind Helper
2.309
316045AC1-158 PL2
Solar/Wind Helper
7.388
316450AC1-158 RIC
Solar/Wind Helper
0.616
316468AD1-105 GEN
Solar/Wind Helper
2.225
316156AD2-030 GEN
Solar/Wind Helper
0.548
316337AD2-073 GEN
Solar/Wind Helper
0.563
316313AB2-026
Solar/Wind Helper
0.577
270399AC1-101 GEN
Solar/Wind Harmer
1.686
270400AC1-102 GEN
Solar/Wind Harmer
1.686
270583AD2-179 GEN
Solar/Wind Harmer
12.447
270494AE1-108_GEN
Solar/Wind Helper
5.58
270346AE1-212 GEN
Solar/Wind Harmer
8.186
270030AE2-140 GEN
Solar/Wind Harmer
17.484
270069AE2-166 C O1
Solar/Wind Harmer
8.427
316006AB2-029 C
Solar/Wind Helper
0.541
316192AB2-158 GEN
Solar/Wind Helper
2.765
316164AC1-076 GEN
Solar/Wind Helper
1.94
316223AC1-118
Solar/Wind Helper
0.567
315975AC1-164 GENB
Solar/Wind Helper
0.061
315976AC1-164 GENA
Solar/Wind Helper
2.054
316169AC1-164_GENC
Solar/Wind Helper
1.775
316233AE1-074 FULL
Solar/Wind Helper
0.6
943031AE2-326 GEN
Solar/Wind Harmer
11.709
943811AF1-049 GEN
Solar/Wind Harmer
0
944491AF1-114 GEN
Solar/Wind Helper
2.856
960911AF2-382 GEN
Solar/Wind Harmer
6.617
961951AG1-038 GEN
Solar/Wind Helper
1.258
963031AG1-152 GEN
50/50
Charging
10.85
966871AG1-558 GEN
Solar/Wind Helper
0.436
966881AG1-559 GEN
Solar/Wind Helper
0.447
970119AG2-088 GEN
50/50
Charging
16.824
970281AG2-184 GEN
Solar/Wind Harmer
15.747
970417AG2-272 GEN
50/50
8.428
970563AG2-360 GEN
50/50
45.019
970823AG2-518 GEN
50/50
19.371
970913AG2-568 GEN
Solar/Wind Harmer
5.92
971225AH1-072 GEN
Solar/Wind Harmer
1.625
971227AH1-073 GEN
Solar/Wind Harmer
1.625
971277AH1-098 GEN
Solar/Wind Harmer
4.558
971277AH1-098 GEN
Solar/Wind Harmer
4.144
971313AH1-133 GEN
Solar/Wind Harmer
6.407
971329AH1-144 GEN
Solar/Wind Harmer
7.833
971331AH1-145 GEN
Solar/Wind Harmer
17.216
971403AH1-188 GEN
Solar/Wind Harmer
10.665
971461AH1-227 GEN
Solar/Wind Harmer
4.169
971507AH1-251 GEN
50/50
Charging
5.863
971531AH1-263 GEN
50/50
Charging
23.667
971543AH1-269 GEN
50/50
11.498
971687AH1-348 GEN
Solar/Wind Harmer
0.807
941621AE2-160 GEN
50/50
6.64
957191AF2-013 GEN
50/50
Charging
10.655
957601AF2-054 GEN
Solar/Wind Helper
0.551
957971AF2-091 GEN
Solar/Wind Helper
0.971
964211AG1-282 GEN
Solar/Wind Helper
0.564
966001AG1-469 GEN
Solar/Wind Helper
0.423
966391AG1-508 GEN
Solar/Wind Harmer
10.239
971981AH1-535 GEN
Solar/Wind Harmer
6.611
971981AH1-535 GEN
Solar/Wind Harmer
7.212
972103AH1-617 GEN
Solar/Wind Harmer
14.997
972273AH1-721 GEN
50/50
85.07
958121AF2-106 GEN
Solar/Wind Harmer
0
970365AG2-240 GEN
50/50
Charging
1.246
971881AH1-461 GEN
50/50
14.324
972293SS25-0014
50/50
Charging
57.012
316487AF1-042 GEN
Solar/Wind Helper
1.165
316484AD2-074 GEN
Solar/Wind Helper
2.227
CBM West 1LTFEXP_CBM-W1->PJM
CBM
105.883
CBM West 2LTFEXP_CBM-W2->PJM
CBM
115.004
CBM South 1LTFEXP_CBM-S1->PJM
CBM
35.022
CBM South 2LTFEXP_CBM-S2->PJM
CBM
22.666
NYPJM->LTFIMP_NY
CLTF
2.178
LGEELTFEXP_LGEE->PJM
CLTF
5.763
WECLTFEXP_WEC->PJM
CLTF
2.894
CPLELTFEXP_CPLE->PJM
CLTF
4.752
TVALTFEXP_TVA->PJM
CLTF
9.526
MECLTFEXP_MEC->PJM
CLTF
13.346
LAGNLTFEXP_LAGN->PJM
CLTF
17.994
SIGELTFEXP_SIGE->PJM
CLTF
0.438
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
24.507
AG2-052LTFEXP_AG2-052->PJM
LTF
0.174
AH1-155LTFEXP_AH1-155->PJM
LTF
0.26

Details for 05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line l/o DVP_P4-2: 547T566_SRT-L


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 547T566_SRT-L
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:173.35 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:2045.56
MW Contribution:
1.25
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeMW Contribution
316075AC2-137 C
Solar/Wind Helper
0.582
316077AC2-138 C
Solar/Wind Helper
0.394
316059AD1-063 C
Solar/Wind Helper
0.419
316159AE1-175 C
Solar/Wind Helper
0.538
316258AE1-075 C
Solar/Wind Helper
0.52
316303AF2-085
50/50
Charging
2.246
316314AB2-024 C
Solar/Wind Helper
0.561
316382AG1-145 C
Solar/Wind Helper
0.541
316405AF2-144 C
Solar/Wind Helper
0.491
316405AF2-144 C
50/50
Charging
1.177
316404AE1-155 C
Solar/Wind Helper
3.567
316203AE2-005 GEN
Solar/Wind Helper
3.62
316441AF1-014 GEN
Solar/Wind Helper
0.554
315616AA1-038_C
Solar/Wind Helper
2.018
316312AB1-027
Solar/Wind Helper
0.748
315651AD1-115 GEN
Solar/Wind Helper
4.205
315821AE2-092 GEN
Solar/Wind Helper
3.841
315662AE1-191 GEN
Solar/Wind Helper
2.223
315666AE1-190 GEN
Solar/Wind Helper
0.556
316280AD1-041 GEN
Solar/Wind Helper
1.389
316473AC1-191 GEN
Solar/Wind Helper
2.43
316447AC1-158 HLD
Solar/Wind Helper
5.083
316044AC1-158 PL1
Solar/Wind Helper
2.31
316045AC1-158 PL2
Solar/Wind Helper
7.393
316450AC1-158 RIC
Solar/Wind Helper
0.616
316468AD1-105 GEN
Solar/Wind Helper
2.227
316156AD2-030 GEN
Solar/Wind Helper
0.548
316337AD2-073 GEN
Solar/Wind Helper
0.564
316313AB2-026
Solar/Wind Helper
0.578
270399AC1-101 GEN
Solar/Wind Harmer
1.686
270400AC1-102 GEN
Solar/Wind Harmer
1.686
270583AD2-179 GEN
Solar/Wind Harmer
12.446
270494AE1-108_GEN
Solar/Wind Helper
5.59
270346AE1-212 GEN
Solar/Wind Harmer
8.185
270030AE2-140 GEN
Solar/Wind Harmer
17.478
270069AE2-166 C O1
Solar/Wind Harmer
8.425
316006AB2-029 C
Solar/Wind Helper
0.541
316192AB2-158 GEN
Solar/Wind Helper
2.769
316164AC1-076 GEN
Solar/Wind Helper
1.941
316223AC1-118
Solar/Wind Helper
0.568
315975AC1-164 GENB
Solar/Wind Helper
0.061
315976AC1-164 GENA
Solar/Wind Helper
2.057
316169AC1-164_GENC
Solar/Wind Helper
1.777
316233AE1-074 FULL
Solar/Wind Helper
0.6
943031AE2-326 GEN
Solar/Wind Harmer
11.708
943811AF1-049 GEN
Solar/Wind Harmer
0
944491AF1-114 GEN
Solar/Wind Helper
2.859
960911AF2-382 GEN
Solar/Wind Harmer
6.616
961951AG1-038 GEN
Solar/Wind Helper
1.26
963031AG1-152 GEN
50/50
Charging
10.856
966871AG1-558 GEN
Solar/Wind Helper
0.437
966881AG1-559 GEN
Solar/Wind Helper
0.447
970119AG2-088 GEN
50/50
Charging
16.846
970281AG2-184 GEN
Solar/Wind Harmer
15.746
970417AG2-272 GEN
50/50
8.425
970563AG2-360 GEN
50/50
45.014
970823AG2-518 GEN
50/50
19.368
970913AG2-568 GEN
Solar/Wind Harmer
5.92
971225AH1-072 GEN
Solar/Wind Harmer
1.625
971227AH1-073 GEN
Solar/Wind Harmer
1.625
971277AH1-098 GEN
Solar/Wind Harmer
4.558
971277AH1-098 GEN
Solar/Wind Harmer
4.143
971313AH1-133 GEN
Solar/Wind Harmer
6.407
971329AH1-144 GEN
Solar/Wind Harmer
7.832
971331AH1-145 GEN
Solar/Wind Harmer
17.214
971403AH1-188 GEN
Solar/Wind Harmer
10.665
971461AH1-227 GEN
Solar/Wind Harmer
4.168
971507AH1-251 GEN
50/50
Charging
5.867
971531AH1-263 GEN
50/50
Charging
23.682
971543AH1-269 GEN
50/50
11.496
971687AH1-348 GEN
Solar/Wind Harmer
0.807
941621AE2-160 GEN
50/50
6.64
957191AF2-013 GEN
50/50
Charging
10.663
957601AF2-054 GEN
Solar/Wind Helper
0.551
957971AF2-091 GEN
Solar/Wind Helper
0.972
964211AG1-282 GEN
Solar/Wind Helper
0.564
966001AG1-469 GEN
Solar/Wind Helper
0.424
966391AG1-508 GEN
Solar/Wind Harmer
10.237
971981AH1-535 GEN
Solar/Wind Harmer
6.61
971981AH1-535 GEN
Solar/Wind Harmer
7.211
972103AH1-617 GEN
Solar/Wind Harmer
14.996
972273AH1-721 GEN
50/50
85.068
958121AF2-106 GEN
Solar/Wind Harmer
0
970365AG2-240 GEN
50/50
Charging
1.247
971881AH1-461 GEN
50/50
14.323
972293SS25-0014
50/50
Charging
57.048
316487AF1-042 GEN
Solar/Wind Helper
1.167
316484AD2-074 GEN
Solar/Wind Helper
2.229
CBM West 1LTFEXP_CBM-W1->PJM
CBM
105.9
CBM West 2LTFEXP_CBM-W2->PJM
CBM
114.999
CBM South 1LTFEXP_CBM-S1->PJM
CBM
35.017
CBM South 2LTFEXP_CBM-S2->PJM
CBM
22.652
NYPJM->LTFIMP_NY
CLTF
2.177
LGEELTFEXP_LGEE->PJM
CLTF
5.764
WECLTFEXP_WEC->PJM
CLTF
2.895
CPLELTFEXP_CPLE->PJM
CLTF
4.745
TVALTFEXP_TVA->PJM
CLTF
9.524
MECLTFEXP_MEC->PJM
CLTF
13.347
LAGNLTFEXP_LAGN->PJM
CLTF
17.991
SIGELTFEXP_SIGE->PJM
CLTF
0.438
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
24.478
AG2-052LTFEXP_AG2-052->PJM
LTF
0.174
AH1-155LTFEXP_AH1-155->PJM
LTF
0.26

Details for 05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line l/o AEP_P1-2_#7422_16_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
Contingency Name:
AEP_P1-2_#7422_16_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:171.54 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:2024.13
MW Contribution:
1.25
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeMW Contribution
316075AC2-137 C
Solar/Wind Helper
0.581
316077AC2-138 C
Solar/Wind Helper
0.394
316059AD1-063 C
Solar/Wind Helper
0.418
316159AE1-175 C
Solar/Wind Helper
0.538
316258AE1-075 C
Solar/Wind Helper
0.519
316303AF2-085
50/50
Charging
2.243
316314AB2-024 C
Solar/Wind Helper
0.561
316382AG1-145 C
Solar/Wind Helper
0.541
316405AF2-144 C
50/50
Charging
1.174
316404AE1-155 C
Solar/Wind Helper
3.563
316203AE2-005 GEN
Solar/Wind Helper
3.616
316441AF1-014 GEN
Solar/Wind Helper
0.553
315616AA1-038_C
Solar/Wind Helper
1.957
315651AD1-115 GEN
Solar/Wind Helper
4.201
315821AE2-092 GEN
Solar/Wind Helper
3.827
315662AE1-191 GEN
Solar/Wind Helper
2.22
315666AE1-190 GEN
Solar/Wind Helper
0.555
316280AD1-041 GEN
Solar/Wind Helper
1.388
316473AC1-191 GEN
Solar/Wind Helper
2.427
316468AD1-105 GEN
Solar/Wind Helper
2.225
316156AD2-030 GEN
Solar/Wind Helper
0.548
316337AD2-073 GEN
Solar/Wind Helper
0.563
316313AB2-026
Solar/Wind Helper
0.577
270399AC1-101 GEN
Solar/Wind Harmer
3.469
270400AC1-102 GEN
Solar/Wind Harmer
3.469
270583AD2-179 GEN
Solar/Wind Harmer
12.447
270494AE1-108_GEN
Solar/Wind Helper
5.579
270346AE1-212 GEN
Solar/Wind Harmer
8.186
270030AE2-140 GEN
Solar/Wind Harmer
17.484
270069AE2-166 C O1
Solar/Wind Harmer
8.427
270053AF1-130 C
Solar/Wind Harmer
12.797
316006AB2-029 C
Solar/Wind Helper
0.541
316192AB2-158 GEN
Solar/Wind Helper
2.765
316164AC1-076 GEN
Solar/Wind Helper
1.94
316223AC1-118
Solar/Wind Helper
0.567
316233AE1-074 FULL
Solar/Wind Helper
0.6
943031AE2-326 GEN
Solar/Wind Harmer
11.709
943811AF1-049 GEN
Solar/Wind Harmer
0
944491AF1-114 GEN
Solar/Wind Helper
2.856
944971AF1-162 GEN
Solar/Wind Harmer
2.093
960911AF2-382 GEN
Solar/Wind Harmer
6.617
961951AG1-038 GEN
Solar/Wind Helper
1.258
963031AG1-152 GEN
50/50
Charging
10.85
970119AG2-088 GEN
50/50
Charging
16.823
970281AG2-184 GEN
Solar/Wind Harmer
15.747
970417AG2-272 GEN
50/50
8.428
970563AG2-360 GEN
50/50
45.019
970823AG2-518 GEN
50/50
19.371
970913AG2-568 GEN
Solar/Wind Harmer
5.92
971225AH1-072 GEN
Solar/Wind Harmer
1.625
971227AH1-073 GEN
Solar/Wind Harmer
1.625
971313AH1-133 GEN
Solar/Wind Harmer
6.407
971329AH1-144 GEN
Solar/Wind Harmer
7.833
971331AH1-145 GEN
Solar/Wind Harmer
17.216
971403AH1-188 GEN
Solar/Wind Harmer
10.665
971461AH1-227 GEN
Solar/Wind Harmer
4.169
971507AH1-251 GEN
50/50
Charging
5.863
971531AH1-263 GEN
50/50
Charging
23.667
971543AH1-269 GEN
50/50
11.498
971687AH1-348 GEN
Solar/Wind Harmer
0.807
941621AE2-160 GEN
50/50
6.64
957191AF2-013 GEN
50/50
Charging
10.655
957601AF2-054 GEN
Solar/Wind Helper
0.551
957971AF2-091 GEN
Solar/Wind Helper
0.971
964211AG1-282 GEN
Solar/Wind Helper
0.564
966001AG1-469 GEN
Solar/Wind Helper
0.423
966391AG1-508 GEN
Solar/Wind Harmer
10.239
972103AH1-617 GEN
Solar/Wind Harmer
14.997
972273AH1-721 GEN
50/50
85.07
957241AF2-018 GEN
Solar/Wind Harmer
0
958121AF2-106 GEN
Solar/Wind Harmer
0
970365AG2-240 GEN
50/50
Charging
1.246
971881AH1-461 GEN
50/50
14.324
972293SS25-0014
50/50
Charging
57.012
316487AF1-042 GEN
Solar/Wind Helper
1.165
316484AD2-074 GEN
Solar/Wind Helper
2.227
CBM West 1LTFEXP_CBM-W1->PJM
CBM
105.883
CBM West 2LTFEXP_CBM-W2->PJM
CBM
115.004
CBM South 1LTFEXP_CBM-S1->PJM
CBM
35.022
CBM South 2LTFEXP_CBM-S2->PJM
CBM
22.666
NYPJM->LTFIMP_NY
CLTF
2.179
LGEELTFEXP_LGEE->PJM
CLTF
5.763
WECLTFEXP_WEC->PJM
CLTF
2.894
CPLELTFEXP_CPLE->PJM
CLTF
4.752
TVALTFEXP_TVA->PJM
CLTF
9.526
MECLTFEXP_MEC->PJM
CLTF
13.346
LAGNLTFEXP_LAGN->PJM
CLTF
17.994
SIGELTFEXP_SIGE->PJM
CLTF
0.438
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
24.507
AG2-052LTFEXP_AG2-052->PJM
LTF
0.174
AH1-155LTFEXP_AH1-155->PJM
LTF
0.26

Details for 05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line l/o AP_P2-3_PE-765-237805-SB3_SRT-SL_SENS


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-765-237805-SB3_SRT-SL_SENS
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:138.39 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1632.98
MW Contribution:
1.15
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeMW Contribution
316312AB1-027
Solar/Wind Helper
0.693
316473AC1-191 GEN
Solar/Wind Helper
2.25
316447AC1-158 HLD
Solar/Wind Helper
4.798
316044AC1-158 PL1
Solar/Wind Helper
2.181
316045AC1-158 PL2
Solar/Wind Helper
6.979
316450AC1-158 RIC
Solar/Wind Helper
0.582
316468AD1-105 GEN
Solar/Wind Helper
2.079
270399AC1-101 GEN
Solar/Wind Harmer
3.156
270400AC1-102 GEN
Solar/Wind Harmer
3.156
270583AD2-179 GEN
Solar/Wind Harmer
9.358
270494AE1-108_GEN
Solar/Wind Helper
4.816
270346AE1-212 GEN
Solar/Wind Harmer
6.755
270069AE2-166 C O1
Solar/Wind Harmer
6.316
270053AF1-130 C
Solar/Wind Harmer
11.711
316006AB2-029 C
Solar/Wind Helper
0.504
316164AC1-076 GEN
Solar/Wind Helper
1.745
943031AE2-326 GEN
Solar/Wind Harmer
9.448
944491AF1-114 GEN
Solar/Wind Helper
2.702
944971AF1-162 GEN
Solar/Wind Harmer
10.409
960911AF2-382 GEN
Solar/Wind Harmer
5.69
963031AG1-152 GEN
50/50
Charging
10.244
966871AG1-558 GEN
Solar/Wind Helper
0.404
966881AG1-559 GEN
Solar/Wind Helper
0.418
970281AG2-184 GEN
Solar/Wind Harmer
14.006
970417AG2-272 GEN
50/50
6.326
970563AG2-360 GEN
50/50
37.854
970823AG2-518 GEN
50/50
14.083
970913AG2-568 GEN
Solar/Wind Harmer
5.207
971225AH1-072 GEN
Solar/Wind Harmer
1.417
971227AH1-073 GEN
Solar/Wind Harmer
1.417
971277AH1-098 GEN
Solar/Wind Harmer
3.644
971277AH1-098 GEN
Solar/Wind Harmer
3.312
971313AH1-133 GEN
Solar/Wind Harmer
5.386
971329AH1-144 GEN
Solar/Wind Harmer
5.99
971331AH1-145 GEN
Solar/Wind Harmer
13.165
971403AH1-188 GEN
Solar/Wind Harmer
9.621
971461AH1-227 GEN
Solar/Wind Harmer
3.634
971507AH1-251 GEN
50/50
Charging
5.466
971531AH1-263 GEN
50/50
Charging
22.363
971543AH1-269 GEN
50/50
8.594
971687AH1-348 GEN
Solar/Wind Harmer
0.705
941621AE2-160 GEN
50/50
5.904
957191AF2-013 GEN
50/50
Charging
10.139
957971AF2-091 GEN
Solar/Wind Helper
0.919
966391AG1-508 GEN
Solar/Wind Harmer
8.202
972103AH1-617 GEN
Solar/Wind Harmer
13.339
972273AH1-721 GEN
50/50
76.948
957241AF2-018 GEN
Solar/Wind Harmer
0
958121AF2-106 GEN
Solar/Wind Harmer
0
970365AG2-240 GEN
50/50
Charging
1.154
971881AH1-461 GEN
50/50
11.944
972293SS25-0014
50/50
Charging
53.849
CBM West 1LTFEXP_CBM-W1->PJM
CBM
101.492
CBM West 2LTFEXP_CBM-W2->PJM
CBM
104.58
CBM South 1LTFEXP_CBM-S1->PJM
CBM
31.066
CBM South 2LTFEXP_CBM-S2->PJM
CBM
18.046
NYPJM->LTFIMP_NY
CLTF
2.2
LGEELTFEXP_LGEE->PJM
CLTF
5.464
WECLTFEXP_WEC->PJM
CLTF
2.768
CPLELTFEXP_CPLE->PJM
CLTF
3.423
TVALTFEXP_TVA->PJM
CLTF
8.341
MECLTFEXP_MEC->PJM
CLTF
12.527
LAGNLTFEXP_LAGN->PJM
CLTF
15.911
SIGELTFEXP_SIGE->PJM
CLTF
0.412
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
17.043
AG2-052LTFEXP_AG2-052->PJM
LTF
0.168
AH1-155LTFEXP_AH1-155->PJM
LTF
0.252

Details for 05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line l/o AP_P2-3_PE-765-237805-SB4_SRT-SL_SENS


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-765-237805-SB4_SRT-SL_SENS
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:138.39 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1632.98
MW Contribution:
1.15
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeMW Contribution
316312AB1-027
Solar/Wind Helper
0.693
316473AC1-191 GEN
Solar/Wind Helper
2.25
316447AC1-158 HLD
Solar/Wind Helper
4.798
316044AC1-158 PL1
Solar/Wind Helper
2.181
316045AC1-158 PL2
Solar/Wind Helper
6.979
316450AC1-158 RIC
Solar/Wind Helper
0.582
316468AD1-105 GEN
Solar/Wind Helper
2.079
270399AC1-101 GEN
Solar/Wind Harmer
3.156
270400AC1-102 GEN
Solar/Wind Harmer
3.156
270583AD2-179 GEN
Solar/Wind Harmer
9.358
270494AE1-108_GEN
Solar/Wind Helper
4.816
270346AE1-212 GEN
Solar/Wind Harmer
6.755
270069AE2-166 C O1
Solar/Wind Harmer
6.316
270053AF1-130 C
Solar/Wind Harmer
11.711
316006AB2-029 C
Solar/Wind Helper
0.504
316164AC1-076 GEN
Solar/Wind Helper
1.745
943031AE2-326 GEN
Solar/Wind Harmer
9.448
944491AF1-114 GEN
Solar/Wind Helper
2.702
944971AF1-162 GEN
Solar/Wind Harmer
10.409
960911AF2-382 GEN
Solar/Wind Harmer
5.69
963031AG1-152 GEN
50/50
Charging
10.244
966871AG1-558 GEN
Solar/Wind Helper
0.404
966881AG1-559 GEN
Solar/Wind Helper
0.418
970281AG2-184 GEN
Solar/Wind Harmer
14.006
970417AG2-272 GEN
50/50
6.326
970563AG2-360 GEN
50/50
37.854
970823AG2-518 GEN
50/50
14.083
970913AG2-568 GEN
Solar/Wind Harmer
5.207
971225AH1-072 GEN
Solar/Wind Harmer
1.417
971227AH1-073 GEN
Solar/Wind Harmer
1.417
971277AH1-098 GEN
Solar/Wind Harmer
3.644
971277AH1-098 GEN
Solar/Wind Harmer
3.312
971313AH1-133 GEN
Solar/Wind Harmer
5.386
971329AH1-144 GEN
Solar/Wind Harmer
5.99
971331AH1-145 GEN
Solar/Wind Harmer
13.165
971403AH1-188 GEN
Solar/Wind Harmer
9.621
971461AH1-227 GEN
Solar/Wind Harmer
3.634
971507AH1-251 GEN
50/50
Charging
5.466
971531AH1-263 GEN
50/50
Charging
22.363
971543AH1-269 GEN
50/50
8.594
971687AH1-348 GEN
Solar/Wind Harmer
0.705
941621AE2-160 GEN
50/50
5.904
957191AF2-013 GEN
50/50
Charging
10.139
957971AF2-091 GEN
Solar/Wind Helper
0.919
966391AG1-508 GEN
Solar/Wind Harmer
8.202
972103AH1-617 GEN
Solar/Wind Harmer
13.339
972273AH1-721 GEN
50/50
76.948
957241AF2-018 GEN
Solar/Wind Harmer
0
958121AF2-106 GEN
Solar/Wind Harmer
0
970365AG2-240 GEN
50/50
Charging
1.154
971881AH1-461 GEN
50/50
11.944
972293SS25-0014
50/50
Charging
53.849
CBM West 1LTFEXP_CBM-W1->PJM
CBM
101.492
CBM West 2LTFEXP_CBM-W2->PJM
CBM
104.58
CBM South 1LTFEXP_CBM-S1->PJM
CBM
31.066
CBM South 2LTFEXP_CBM-S2->PJM
CBM
18.046
NYPJM->LTFIMP_NY
CLTF
2.2
LGEELTFEXP_LGEE->PJM
CLTF
5.464
WECLTFEXP_WEC->PJM
CLTF
2.768
CPLELTFEXP_CPLE->PJM
CLTF
3.423
TVALTFEXP_TVA->PJM
CLTF
8.341
MECLTFEXP_MEC->PJM
CLTF
12.527
LAGNLTFEXP_LAGN->PJM
CLTF
15.911
SIGELTFEXP_SIGE->PJM
CLTF
0.412
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
17.043
AG2-052LTFEXP_AG2-052->PJM
LTF
0.168
AH1-155LTFEXP_AH1-155->PJM
LTF
0.252

Details for 05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line l/o AP_P1-2_PE-765-242508-237805_SRT-A_SENS


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Addition to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:AEP
Facility Description:
05CLOVRD_RJO-05JOSHUA 765.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-765-242508-237805_SRT-A_SENS
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:136.83 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1614.63
MW Contribution:
1.15
Impact of Topology Modeling:
Addition
Bus #Bus NameTypeMW Contribution
316473AC1-191 GEN
Solar/Wind Helper
2.25
316468AD1-105 GEN
Solar/Wind Helper
2.079
270399AC1-101 GEN
Solar/Wind Harmer
3.156
270400AC1-102 GEN
Solar/Wind Harmer
3.156
270583AD2-179 GEN
Solar/Wind Harmer
9.358
270494AE1-108_GEN
Solar/Wind Helper
4.816
270346AE1-212 GEN
Solar/Wind Harmer
6.755
270030AE2-140 GEN
Solar/Wind Harmer
3.161
270069AE2-166 C O1
Solar/Wind Harmer
6.316
270053AF1-130 C
Solar/Wind Harmer
11.711
316006AB2-029 C
Solar/Wind Helper
0.504
316164AC1-076 GEN
Solar/Wind Helper
1.745
943031AE2-326 GEN
Solar/Wind Harmer
9.448
944491AF1-114 GEN
Solar/Wind Helper
2.702
944971AF1-162 GEN
Solar/Wind Harmer
12.03
960911AF2-382 GEN
Solar/Wind Harmer
5.69
963031AG1-152 GEN
50/50
Charging
10.244
970281AG2-184 GEN
Solar/Wind Harmer
14.006
970417AG2-272 GEN
50/50
6.326
970563AG2-360 GEN
50/50
37.854
970823AG2-518 GEN
50/50
14.083
970913AG2-568 GEN
Solar/Wind Harmer
5.207
971225AH1-072 GEN
Solar/Wind Harmer
1.417
971227AH1-073 GEN
Solar/Wind Harmer
1.417
971313AH1-133 GEN
Solar/Wind Harmer
5.386
971329AH1-144 GEN
Solar/Wind Harmer
5.99
971331AH1-145 GEN
Solar/Wind Harmer
13.165
971403AH1-188 GEN
Solar/Wind Harmer
9.621
971461AH1-227 GEN
Solar/Wind Harmer
3.634
971507AH1-251 GEN
50/50
Charging
5.466
971531AH1-263 GEN
50/50
Charging
22.363
971543AH1-269 GEN
50/50
8.594
971687AH1-348 GEN
Solar/Wind Harmer
0.705
941621AE2-160 GEN
50/50
5.904
957191AF2-013 GEN
50/50
Charging
10.139
957971AF2-091 GEN
Solar/Wind Helper
0.919
966391AG1-508 GEN
Solar/Wind Harmer
8.202
972103AH1-617 GEN
Solar/Wind Harmer
13.339
972273AH1-721 GEN
50/50
76.948
957241AF2-018 GEN
Solar/Wind Harmer
0
958121AF2-106 GEN
Solar/Wind Harmer
0
970365AG2-240 GEN
50/50
Charging
1.154
971881AH1-461 GEN
50/50
11.944
972293SS25-0014
50/50
Charging
53.849
CBM West 1LTFEXP_CBM-W1->PJM
CBM
101.492
CBM West 2LTFEXP_CBM-W2->PJM
CBM
104.58
CBM South 1LTFEXP_CBM-S1->PJM
CBM
31.066
CBM South 2LTFEXP_CBM-S2->PJM
CBM
18.046
NYPJM->LTFIMP_NY
CLTF
2.2
LGEELTFEXP_LGEE->PJM
CLTF
5.464
WECLTFEXP_WEC->PJM
CLTF
2.768
CPLELTFEXP_CPLE->PJM
CLTF
3.423
TVALTFEXP_TVA->PJM
CLTF
8.341
MECLTFEXP_MEC->PJM
CLTF
12.527
LAGNLTFEXP_LAGN->PJM
CLTF
15.911
SIGELTFEXP_SIGE->PJM
CLTF
0.412
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
17.043
AG2-052LTFEXP_AG2-052->PJM
LTF
0.168
AH1-155LTFEXP_AH1-155->PJM
LTF
0.252
CONTINGENCY 'AEP_P4_#7422_05CLOVRD 500_EE2_SRT-A'
 OPEN BRANCH FROM BUS 242519 TO BUS 314912 CKT 1   /*05CLOVRD     500.0 - 8LEXNGTN     500.0
END
CONTINGENCY 'DVP_P4-2: 56602_SRT-A'
 OPEN BRANCH FROM BUS 242519 TO BUS 314912 CKT 1   /*05CLOVRD     500.0 - 8LEXNGTN     500.0
 OPEN BRANCH FROM BUS 314856 TO BUS 314912 CKT 1   /*6LEXNGT2     230.0 - 8LEXNGTN     500.0
END
CONTINGENCY 'DVP_P4-2: 547T566_SRT-L'
 OPEN BRANCH FROM BUS 242519 TO BUS 314912 CKT 1                /*05CLOVRD     500.0 - 8LEXNGTN     500.0
 OPEN BRANCH FROM BUS 314901 TO BUS 314987 CKT 1                /*8BATH CO     500.0 - 8LEXINGTN SC 500.0
 OPEN BRANCH FROM BUS 314912 TO BUS 314987 CKT 1                /*8LEXNGTN     500.0 - 8LEXINGTN SC 500.0
 OPEN BUS 314987                                                /*8LEXINGTN SC 500.0
 SET POSTCONTRATING 3914 BRANCH FROM BUS 314901 TO BUS 314991 CKT 1 /*8BATH CO     500.0 - 8VALLEY SC   500.0
 SET PRECONTRATING 3880 BRANCH FROM BUS 314901 TO BUS 314991 CKT 1 /*8BATH CO     500.0 - 8VALLEY SC   500.0
END
CONTINGENCY 'AEP_P1-2_#7422_16_SRT-A'
 OPEN BRANCH FROM BUS 242519 TO BUS 314912 CKT 1   /*05CLOVRD     500.0 - 8LEXNGTN     500.0
END
CONTINGENCY 'AP_P2-3_PE-765-237805-SB3_SRT-SL_SENS'
 DISCONNECT BRANCH FROM BUS 242508 TO BUS 237805 CKT 1          /*05AMOS       765.0 - 01WELTON_SPR 765.0
 REDUCE BUS 237805 SHUNT BY 50 PERCENT                          /*01WELTON_SPR 765.0
 SET PRECONTRATING 6392 BRANCH FROM BUS 237805 TO BUS 237806 CKT 1 /*01WELTON_SPR 765.0 - 01ROCKYPOINT 765.0
END
CONTINGENCY 'AP_P2-3_PE-765-237805-SB4_SRT-SL_SENS'
 DISCONNECT BRANCH FROM BUS 242508 TO BUS 237805 CKT 1          /*05AMOS       765.0 - 01WELTON_SPR 765.0
 REDUCE BUS 237805 SHUNT BY 50 PERCENT                          /*01WELTON_SPR 765.0
 SET PRECONTRATING 6392 BRANCH FROM BUS 237805 TO BUS 237806 CKT 1 /*01WELTON_SPR 765.0 - 01ROCKYPOINT 765.0
END
CONTINGENCY 'AP_P1-2_PE-765-242508-237805_SRT-A_SENS'
 DISCONNECT BRANCH FROM BUS 242508 TO BUS 237805 CKT 1   /*05AMOS       765.0 - 01WELTON_SPR 765.0
END
290614 to 242515 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2DVP
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
DVP_P4-2: H2T557_SRT-L
BreakerAC122.36 %1212.0C1483.0
3.24
GD2DVP
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
DVP_P4-2: 568T581_SRT-L
BreakerAC105.16 %4628.0C4866.67
3.25

Details for 6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer l/o DVP_P4-2: H2T557_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer
Contingency Name:
DVP_P4-2: H2T557_SRT-L
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:122.36 %
Rating:1212.0 MVA
Rating Type:C
MVA to Mitigate:1483.0
MW Contribution:
3.24
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
3142416OLDCHRC
Solar/Wind Harmer
2.929
3142416OLDCHRC
Solar/Wind Harmer
2.24
3142416OLDCHRC
Solar/Wind Harmer
0.858
3142433PROV 92
Solar/Wind Harmer
2.516
3142956BIRDNECK
Solar/Wind Harmer
0.84
3143316POE
Solar/Wind Harmer
2.184
3145506HICKORY
Solar/Wind Harmer
1.871
3145506HICKORY
Solar/Wind Harmer
1.123
3145506HICKORY
Solar/Wind Harmer
0.281
3138133OCRAN
Solar/Wind Harmer
0.331
3138133OCRAN
Solar/Wind Harmer
0.166
3138283WHITEMARSH
Solar/Wind Harmer
0.029
3141766HARMONY
Solar/Wind Harmer
1.739
3141766HARMONY
Solar/Wind Harmer
0.116
3141783LANCAST
Solar/Wind Harmer
0.328
3141783LANCAST
Solar/Wind Harmer
0.219
3141813NORNECK
Solar/Wind Harmer
0.5
3141913WHIT STONE
Solar/Wind Harmer
0.554
3143226MDLTHAN
Solar/Wind Harmer
0.525
3143873LANEXA
Solar/Wind Harmer
0.362
3141726DUNNSVL
Solar/Wind Harmer
2.055
3145336SMITFLD
Solar/Wind Harmer
2.062
3145336SMITFLD
Solar/Wind Harmer
0.206
3141873WAN 176
Solar/Wind Harmer
2.256
3141873WAN 176
Solar/Wind Harmer
0.113
3143526WINTERP
Solar/Wind Harmer
3.172
3143526WINTERP
Solar/Wind Harmer
3.172
316404AE1-155 C
Solar/Wind Harmer
0
316033AB2-134 GEN
Solar/Wind Harmer
0
3142543TWELFTH
Solar/Wind Harmer
0.069
316203AE2-005 GEN
Solar/Wind Harmer
0
316312AB1-027
Solar/Wind Harmer
-0.125
315671AE2-027_GEN
Solar/Wind Harmer
0
315813AE1-149 C
Solar/Wind Harmer
11.137
315697AD1-025 GEN
Solar/Wind Harmer
0
315778AD1-151 GEN
Solar/Wind Harmer
17.867
316375AC2-012 GEN
Solar/Wind Harmer
0
316311AC2-079 GEN
Solar/Wind Harmer
8.381
315975AC1-164 GENB
Solar/Wind Harmer
-0.22
315976AC1-164 GENA
Solar/Wind Harmer
-7.429
316169AC1-164_GENC
Solar/Wind Harmer
-6.418
316093AE2-104_GEN
Solar/Wind Harmer
4.597
3138126ROCKLANDING
Solar/Wind Harmer
0.055
3142946ENON
Solar/Wind Harmer
0.224
3142946ENON
Solar/Wind Harmer
0.067
3144536CHRHLND
Solar/Wind Harmer
0.073
3144873MCLAUGH
Solar/Wind Harmer
0.012
944591AF1-124 GEN
Solar/Wind Harmer
22.21
944631AF1-128 GEN
50/50
132.706
944641AF1-129 GEN
50/50
113.774
961611AG1-000B GEN
Solar/Wind Harmer
6.971
961611AG1-000B GEN
Solar/Wind Harmer
10.128
962861AG1-135 GEN
Solar/Wind Harmer
6.256
966871AG1-558 GEN
Solar/Wind Harmer
3.345
966871AG1-558 GEN
Solar/Wind Harmer
-0.715
970133AG2-095 GEN
Solar/Wind Harmer
2.303
970293AG2-193 GEN
Solar/Wind Harmer
3.041
970603AG2-384 GEN
50/50
13.994
970657AG2-426 GEN
Solar/Wind Harmer
2.957
970657AG2-426 GEN
Solar/Wind Harmer
3.143
971069AG2-661 GEN
Solar/Wind Harmer
10.268
971223AH1-071 GEN
Solar/Wind Harmer
2.102
971281AH1-106 GEN
Solar/Wind Harmer
3.172
971283AH1-107 GEN
Solar/Wind Harmer
3.172
971317AH1-138 GEN
Solar/Wind Harmer
2.167
971445AH1-216 GEN
Solar/Wind Harmer
7.429
971445AH1-216 GEN
Solar/Wind Harmer
10.246
958261AF2-120 GEN
Solar/Wind Harmer
6.43
971777AH1-397 GEN
Solar/Wind Harmer
2.283
971781AH1-399 GEN
Solar/Wind Harmer
1.407
970365AG2-240 GEN
Solar/Wind Harmer
3.244
972291SS25-0013
Solar/Wind Harmer
44.551
315835AF2-110_GEN
Solar/Wind Harmer
1.876
CBM West 2LTFEXP_CBM-W2->PJM
CBM
8.177
CBM South 1LTFEXP_CBM-S1->PJM
CBM
3.579
CBM South 2LTFEXP_CBM-S2->PJM
CBM
11.64
NYPJM->LTFIMP_NY
CLTF
1.429
GibsonPJM->LTFIMP_GIBSON
CLTF
0
CPLELTFEXP_CPLE->PJM
CLTF
6.164
TVALTFEXP_TVA->PJM
CLTF
1.188
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.125
MECLTFEXP_MEC->PJM
CLTF
0.149
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.349
LAGNLTFEXP_LAGN->PJM
CLTF
2.289
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
17.005

Details for 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line l/o DVP_P4-2: 568T581_SRT-L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:DVP
Facility Description:
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
Contingency Name:
DVP_P4-2: 568T581_SRT-L
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.16 %
Rating:4628.0 MVA
Rating Type:C
MVA to Mitigate:4866.67
MW Contribution:
3.25
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
20390526W1-045 C
Solar/Wind Helper
0.458
23546401DTGZ2-030
Solar/Wind Helper
0.319
20634528N27_Y2-018
Solar/Wind Helper
0.062
20641628MLH_W1-032
Solar/Wind Helper
0.09
20671828STAW2-080
Solar/Wind Helper
0.06
20671928W4-073
Solar/Wind Helper
0.236
20673628F1S_V4-069
Solar/Wind Helper
0.09
20673728F2S_V4-070
Solar/Wind Helper
0.09
20673828FLE_V3-070
Solar/Wind Helper
0.239
20674128FR_U2-059
Solar/Wind Helper
0.065
20674328GAR_V4-001
Solar/Wind Helper
0.059
20674528F3S_W2-016
Solar/Wind Helper
0.448
20674628WNG_W3-110
Solar/Wind Helper
0.222
20674828DL_W4-046
Solar/Wind Helper
0.255
20675128HRM_W1-127
Solar/Wind Helper
0.089
20675428EAM_W2-061
Solar/Wind Helper
0.083
20675528CPH_W2-050
Solar/Wind Helper
0.3
20675728RH_W2-091
Solar/Wind Helper
0.296
20675828AU_W4-064
Solar/Wind Helper
0.089
20675928HOL_W4-097
Solar/Wind Helper
0.089
20676128MHD_W3-029
Solar/Wind Helper
0.251
20676228FRD_X1-012
Solar/Wind Helper
0.296
20676328BVR_Y1-020
Solar/Wind Helper
0.147
20676428JCR_X2-075
Solar/Wind Helper
0.179
20676728BRNX1-095
Solar/Wind Helper
0.089
20714428HOW_X1-037
Solar/Wind Helper
0.444
20714528FRN_Y2-051
Solar/Wind Helper
0.151
20714828MDF_W3-079
Solar/Wind Helper
0.211
20714928UPF_X1-085
Solar/Wind Helper
0.151
20715028HAN_X4-015
Solar/Wind Helper
0.151
20715228NPK_W1-113
Solar/Wind Helper
0.217
20715728PEM_W1-119
Solar/Wind Helper
0.266
20715828PEM_W1-120
Solar/Wind Helper
0.266
20716028EGP_W2-019
Solar/Wind Helper
0.182
20716228APLW2-078
Solar/Wind Helper
0.295
20716428NHV_W2-082
Solar/Wind Helper
0.514
20716928W4-060COL
Solar/Wind Helper
0.3
20717128DIX_Z2-102
Solar/Wind Helper
0.393
20720428HOL_W1-112
Solar/Wind Helper
0.12
20720528MAN_W1-024
Solar/Wind Helper
0.114
20720628TIN_W1-124
Solar/Wind Helper
0.508
20720728JCB_W1-129
Solar/Wind Helper
0.151
20720828JCB_W4-025
Solar/Wind Helper
0.212
207408W3-077 C
Solar/Wind Helper
0.26
207439AE1-081 C O1
Solar/Wind Helper
0.037
214067T20SOLAR
Solar/Wind Helper
0.1
217206BARNGR HS C
Solar/Wind Helper
0.016
217208PARK ELE C
Solar/Wind Helper
0.013
217209CENTRL HS C
Solar/Wind Helper
0.023
217211CAMDEN ST C
Solar/Wind Helper
0.013
217213AMBOY SO C
Solar/Wind Helper
0.069
232404W1-003 C
Solar/Wind Helper
0.686
232408W1-005 C
Solar/Wind Helper
0.686
232410W1-006 C
Solar/Wind Helper
0.686
232417X3-008 C
Solar/Wind Helper
0.62
232426Y1-080 FULL
Solar/Wind Helper
0.105
232428Y3-058 C
Solar/Wind Helper
0.514
23777801MSM_W1-116
Solar/Wind Helper
0.522
23777901MDS_W4-102
Solar/Wind Helper
0.723
3142416OLDCHRC
Solar/Wind Harmer
2.931
3142416OLDCHRC
Solar/Wind Harmer
2.241
3142416OLDCHRC
Solar/Wind Harmer
0.859
3143316POE
Solar/Wind Harmer
3.363
209027LOR2_Q27
Solar/Wind Helper
2.145
212266LOR1
Solar/Wind Helper
0.586
217081WEATEXAS C
Solar/Wind Helper
0.042
217169METRODIV C
Solar/Wind Helper
0.018
217197RE CRAN C
Solar/Wind Helper
0.15
217201HACKENSOLA C
Solar/Wind Helper
0.03
217202FBANKSOLAR C
Solar/Wind Helper
0.03
218428ETC SOLAR C
Solar/Wind Helper
0.017
218438BLK ROCK C
Solar/Wind Helper
0.071
218440SUMMTASSOC C
Solar/Wind Helper
0.06
218449LINSOLAR C
Solar/Wind Helper
0.259
218660EHAMPSOLAR C
Solar/Wind Helper
0.088
219114HARTZY_C
Solar/Wind Helper
0.242
219137THOSOLAR C
Solar/Wind Helper
0.265
219236SOUTHERNHQ C
Solar/Wind Helper
0.028
219249CENTRALDIV C
Solar/Wind Helper
0.022
219272CLEANLIGHT C
Solar/Wind Helper
0.085
219276PARKLANDSO C
Solar/Wind Helper
0.236
219287REEVESEAST C
Solar/Wind Helper
0.335
219291REEVESSOUT C
Solar/Wind Helper
0.03
219348LDSOLAR C
Solar/Wind Helper
0.304
219607WPEMNERT C
Solar/Wind Helper
0.213
219610FLORENCE C
Solar/Wind Helper
0.456
219612MATRIX C
Solar/Wind Helper
0.086
219615MILLCREEK C
Solar/Wind Helper
0.106
219620RIDERU C
Solar/Wind Helper
0.021
219766PARADISE C
Solar/Wind Helper
0.155
219817TRENTONSOL C
Solar/Wind Helper
0.261
227927V4-067C
Solar/Wind Helper
0.079
228260V4-054C
Solar/Wind Helper
0.306
228711V2-041C
Solar/Wind Helper
0.135
235020AA1-095 C
Solar/Wind Helper
0.138
228728W1-130C
Solar/Wind Helper
0.281
228729W2-030 C
Solar/Wind Helper
0.293
3143226MDLTHAN
Solar/Wind Harmer
0.909
232406W1-004 FULL
Solar/Wind Helper
0.686
232436AB1-176 C
Solar/Wind Helper
0.124
217194REDH C
Solar/Wind Helper
0.149
316303AF2-085
50/50
6.269
223402AF1-300 C
Solar/Wind Helper
0.564
230415AB2-049 C
Solar/Wind Helper
0.092
20742028HF_AC1-207
Solar/Wind Helper
0.394
207454AA2-184 E
Solar/Wind Helper
0.602
207459AE1-142 C O1
Solar/Wind Helper
0.604
207471AF2-354 C
Solar/Wind Helper
0.326
208835TUHI V3-051
Solar/Wind Helper
0.038
208835TUHI V3-051
Solar/Wind Helper
0.038
208923BUSO V4-027
Solar/Wind Helper
0.179
232424Y1-079 C
Solar/Wind Helper
0.31
218524CNTRALGAS1 C
Solar/Wind Helper
0.26
218526CNTRALGAS2 C
Solar/Wind Helper
0.26
226910AB2-157 C
Solar/Wind Helper
0.092
233901CHERRYDALE C
Solar/Wind Helper
0.619
233940AF2-379 C
Solar/Wind Helper
0.121
212507AE2-042_GEN
Solar/Wind Helper
2.042
219727YARDVSOLFA C
Solar/Wind Helper
0.262
219907AC1-030 C
Solar/Wind Helper
0.076
237025AB1-124 C
Solar/Wind Helper
0.741
237030AB1-096 C
Solar/Wind Helper
0.303
237034AC2-136 C
Solar/Wind Helper
0.392
237038AE2-054 C
Solar/Wind Helper
0.637
3143526WINTERP
Solar/Wind Harmer
4.656
3143526WINTERP
Solar/Wind Harmer
4.656
316411AF1-147_GEN1
Solar/Wind Helper
2.056
316415AF1-147_GEN2
Solar/Wind Helper
2.056
316033AB2-134 GEN
Solar/Wind Harmer
0
228754AB1-001 C
Solar/Wind Helper
0.07
228351V2-046C
Solar/Wind Helper
0.608
235062AE1-101 C1
Solar/Wind Helper
2.375
205956AE1-196_GEN
Solar/Wind Helper
0.686
217204WCALDSOLAR C
Solar/Wind Helper
0.03
3142543TWELFTH
Solar/Wind Harmer
0.083
237080AD1-060 GEN
Solar/Wind Helper
0.482
235067AD1-061 GEN
Solar/Wind Helper
0.636
237001AB1-127_GEN
Solar/Wind Helper
0.64
237002AB1-128_GEN
Solar/Wind Helper
0.639
238175AF1-290_GEN
Solar/Wind Helper
2.52
238221AF1-254 C O1
Solar/Wind Helper
0.647
238169AE2-226 GEN1
Solar/Wind Helper
1.522
238170AE2-226 GEN2
Solar/Wind Helper
1.522
237085AD2-009_GEN
Solar/Wind Helper
2.203
233944AB2-135 GEN
Solar/Wind Helper
2.196
233946AB2-136 GEN
Solar/Wind Helper
1.753
233994AC2-023 GEN
Solar/Wind Helper
1.571
316312AB1-027
Solar/Wind Harmer
-0.126
315651AD1-115 GEN
Solar/Wind Helper
5.022
237061AD1-155 GEN
Solar/Wind Helper
2.251
237006AB1-125 GEN
Solar/Wind Helper
0.556
23779801AA1-109
Solar/Wind Helper
0.336
233982AB2-133 GEN
Solar/Wind Helper
1.915
233915AB1-141 GEN
Solar/Wind Helper
0.679
233918AB1-142 GEN
Solar/Wind Helper
0.679
315671AE2-027_GEN
Solar/Wind Harmer
0
233930AB2-032 GEN
Solar/Wind Helper
0.62
233987AB2-037 GEN
Solar/Wind Helper
6.26
315813AE1-149 C
Solar/Wind Harmer
16.907
315697AD1-025 GEN
Solar/Wind Harmer
0
233933AB2-153 GEN
Solar/Wind Helper
0.62
233955AB2-172 GEN
Solar/Wind Helper
1.715
315773AC2-141 GEN
Solar/Wind Harmer
0
233935AB2-179 C
Solar/Wind Helper
1.716
316447AC1-158 HLD
Solar/Wind Helper
16.928
316044AC1-158 PL1
Solar/Wind Helper
7.694
316045AC1-158 PL2
Solar/Wind Helper
24.623
316450AC1-158 RIC
Solar/Wind Helper
2.052
315778AD1-151 GEN
Solar/Wind Harmer
25.468
234015AF2-250 C
Solar/Wind Helper
0.067
234036AF2-325 C
Solar/Wind Helper
0.206
207484AF2-139 C O1
Solar/Wind Helper
0.26
207510AF2-138 C
Solar/Wind Helper
0.65
207518AF1-320_GEN
Solar/Wind Helper
2.291
207442AE1-156 GEN
Solar/Wind Helper
0.526
226929AD2-058 GEN
Solar/Wind Helper
0.207
207437AD2-070 GEN
Solar/Wind Helper
0.222
209054AE2-059 GEN
Solar/Wind Helper
0.628
207445AB1-138_GEN
Solar/Wind Helper
0.29
209071AE2-133 GEN
Solar/Wind Helper
0.627
209116AE2-175 GEN
Solar/Wind Helper
2.594
233923SMA
Solar/Wind Helper
2.01
230433AD2-135 GEN
Solar/Wind Helper
0.049
219680HOPEWELLV C1
Solar/Wind Helper
0.03
219686LUMSOLAR_N C
Solar/Wind Helper
0.103
219688LUMSOLAR_S C
Solar/Wind Helper
0.103
219908AB1-139 C
Solar/Wind Helper
0.197
219904AC1-010 C
Solar/Wind Helper
0.183
219906AC1-017 C
Solar/Wind Helper
0.112
219623KINSLEYBEA C
Solar/Wind Helper
0.156
219258KINSLEYDEP C
Solar/Wind Helper
0.176
219304NAMERICA C
Solar/Wind Helper
0.213
219921AF1-264
Solar/Wind Helper
0.091
203975AE1-071-GEN
Solar/Wind Helper
3.281
211065PSPA IPP
Solar/Wind Helper
0.292
211065PSPA IPP
Solar/Wind Helper
0.292
207530AG1-191 GEN
Solar/Wind Helper
0.505
230511AF1-262
Solar/Wind Helper
0.068
205932AD2-116_GEN
Solar/Wind Helper
0.686
205941AD2-115 GEN
Solar/Wind Helper
0.664
205943AE1-185 GEN
Solar/Wind Helper
0.687
205917AD1-020 ES
Solar/Wind Helper
0.496
205916AD1-020 GEN
Solar/Wind Helper
2.308
316006AB2-029 C
Solar/Wind Helper
0.784
316164AC1-076 GEN
Solar/Wind Helper
3.287
316294AC1-161 GEN
Solar/Wind Harmer
-14.993
315975AC1-164 GENB
Solar/Wind Harmer
-0.283
315976AC1-164 GENA
Solar/Wind Harmer
-9.566
316169AC1-164_GENC
Solar/Wind Harmer
-8.264
230434AG1-499 GEN
Solar/Wind Helper
0.338
233964AF2-378 GEN
Solar/Wind Helper
0.077
207511W3-106 GEN
Solar/Wind Helper
0.147
208972BECR K09
Solar/Wind Helper
0.556
209029WAYMART-WD
Solar/Wind Helper
1.372
223401AF1-299 GEN
Solar/Wind Helper
0.564
230407AD2-065 C
Solar/Wind Helper
0.078
232432Z2-076 GEN
Solar/Wind Helper
0.091
232434Z2-077 GEN
Solar/Wind Helper
0.171
233996TM1833_GEN
Solar/Wind Helper
0.548
233997TMININ_4.2
Solar/Wind Helper
0.548
233998TM1NIN_3.36
Solar/Wind Helper
0.548
3142946ENON
Solar/Wind Harmer
0.285
3142946ENON
Solar/Wind Harmer
0.085
944631AF1-128 GEN
50/50
167.753
944641AF1-129 GEN
50/50
168.302
946691AF1-333 GEN
Solar/Wind Helper
0.628
946731AF1-337 GEN
Solar/Wind Helper
0.628
946741AF1-338 GEN
Solar/Wind Helper
0.628
946751AF1-339 GEN
Solar/Wind Helper
0.628
959381AF2-229 GEN
Solar/Wind Helper
0.678
959421AF2-233 GEN
Solar/Wind Helper
0.376
959431AF2-234 GEN
Solar/Wind Helper
0.752
959561AF2-247 GEN
Solar/Wind Helper
0.168
961261AF2-417 GEN
Solar/Wind Helper
0.636
961301AF2-421 GEN
Solar/Wind Helper
0.637
961331AF2-424 GEN
Solar/Wind Helper
0.632
961341AF2-425 GEN
Solar/Wind Helper
0.632
961421AF2-433 GEN
Solar/Wind Helper
0.631
961431AF2-434 GEN
Solar/Wind Helper
0.631
961611AG1-000B GEN
Solar/Wind Harmer
0.183
961611AG1-000B GEN
Solar/Wind Harmer
0.266
963151AG1-164 GEN
Solar/Wind Helper
0.637
963161AG1-165 GEN
Solar/Wind Helper
0.637
970119AG2-088 GEN
50/50
47.017
970133AG2-095 GEN
Solar/Wind Harmer
3.072
970293AG2-193 GEN
Solar/Wind Harmer
3.433
970603AG2-384 GEN
50/50
17.689
971069AG2-661 GEN
Solar/Wind Harmer
14.637
971223AH1-071 GEN
Solar/Wind Harmer
3.636
971281AH1-106 GEN
Solar/Wind Harmer
4.656
971283AH1-107 GEN
Solar/Wind Harmer
4.656
219918AC2-009 C
Solar/Wind Helper
0.01
227287AC2-120 GEN
Solar/Wind Helper
1.012
924131AB2-057 GEN
Solar/Wind Helper
0.332
939411AE1-173 GEN
Solar/Wind Harmer
136.244
940641AE2-051 GEN
Solar/Wind Harmer
25.678
957921AF2-086 GEN
Solar/Wind Helper
0.618
963711AG1-223 GEN
Solar/Wind Helper
0.514
964851AG1-348 GEN
Solar/Wind Helper
0.504
972263AH1-716 GEN
50/50
70.467
970365AG2-240 GEN
Solar/Wind Harmer
3.246
233950AC2-186 GEN
Solar/Wind Helper
0.31
233952AC2-187 GEN
Solar/Wind Helper
0.619
233954AC2-188 GEN
Solar/Wind Helper
0.619
238147AE2-230_GEN1
Solar/Wind Helper
1.032
238148AE2-230_GEN2
Solar/Wind Helper
1.032
238149AF1-291A_GEN
Solar/Wind Helper
0.295
238152AF2-075_GEN
Solar/Wind Helper
1.475
972287SS25-0012
Solar/Wind Harmer
44.57
972291SS25-0013
Solar/Wind Harmer
57.366
972293SS25-0014
50/50
Charging
189.987
232422X3-066 FULL
Solar/Wind Helper
0.186
219919AE1-041 FULL
Solar/Wind Helper
0.018
219912AD2-042 GEN
Solar/Wind Helper
0.402
219914AD2-027 C
Solar/Wind Helper
0.305
235063AE1-101 C2
Solar/Wind Helper
2.375
CBM West 1LTFEXP_CBM-W1->PJM
CBM
27.883
CBM West 2LTFEXP_CBM-W2->PJM
CBM
56.648
CBM South 1LTFEXP_CBM-S1->PJM
CBM
19.471
CBM South 2LTFEXP_CBM-S2->PJM
CBM
33.785
NYPJM->LTFIMP_NY
CLTF
5.235
LGEELTFEXP_LGEE->PJM
CLTF
1.705
WECLTFEXP_WEC->PJM
CLTF
0.84
CPLELTFEXP_CPLE->PJM
CLTF
15.623
TVALTFEXP_TVA->PJM
CLTF
5.757
MECLTFEXP_MEC->PJM
CLTF
4.854
LAGNLTFEXP_LAGN->PJM
CLTF
11.056
SIGELTFEXP_SIGE->PJM
CLTF
0.147
MISO WINDMISO-WIND_EXP->MISO-WIND_IMP
CLTF
47.391
CONTINGENCY 'DVP_P4-2: H2T557_SRT-L'
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2                /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1                /*8CHCKAHM     500.0 - 8ELMONT      500.0
 SET POSTCONTRATING 3300 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET POSTCONTRATING 3300 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 3118 BRANCH FROM BUS 314908 TO BUS 314910 CKT 1 /*8ELMONT      500.0 - 8CUNINGHAM   500.0
 SET PRECONTRATING 3118 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
CONTINGENCY 'DVP_P4-2: 568T581_SRT-L'
 OPEN BRANCH FROM BUS 314135 TO BUS 314905 CKT 2                /*3CHANCE      115.0 - 8CHANCE      500.0
 OPEN BRANCH FROM BUS 314905 TO BUS 314911 CKT 1                /*8CHANCE      500.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1                /*8LADYSMITH   500.0 - 8POSSUM      500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET POSTCONTRATING 3559 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314908 TO BUS 314911 CKT 1 /*8ELMONT      500.0 - 8LADYSMITH   500.0
 SET PRECONTRATING 3377 BRANCH FROM BUS 314911 TO BUS 314918 CKT 1 /*8LADYSMITH   500.0 - 8NO ANNA     500.0
END
314218 to 314908 ckt 1
314918 to 314934 ckt 1

Short Circuit Analysis

Analysis Complete - No Issues

Based on PJM’s TC2 Phase II Short Circuit Analysis, this project did not contribute >1% fault duty to any previously identified overdutied breakers, nor did it cause any new overdutied breakers.

Please note that in TC2 Phase III, PJM will perform additional analysis including the evaluation of impacts from topology upgrades which may have potential effects on breaker duties not seen in the Phase II analysis.

Stability Analysis

Not Required

PJM has reviewed this project submission and determined that a stability study is not required due to connection to a non-BES facility.

Reactive Power Analysis

Not Required

Reactive Power Analysis was not performed. This project is responsible for meeting all applicable power factor requirements based on the project Agreements per PJM’s Tariff, Part IX, Subpart B, App. 2, section 4.6.1.

Steady-State Voltage Analysis

Analysis Complete - No Issues

Steady State Voltage Analysis complete, no voltage issues identified.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AA1-038Lexington-Low Moor 230kVUnder Construction
AB1-027Old Church 34.5 KVIn Service
AB2-024Correctional 34.5kVIn Service
AB2-026Powhatan 34.5kVIn Service
AB2-029Remington 34.5kVIn Service
AB2-158Louisa-South Anna 230kVIn Service
AC1-076Locust Grove-Paytes 115kVIn Service
AC1-101Johns Creek-Excel 138kV IEngineering & Procurement
AC1-102Johns Creek-Excel 138kV IIEngineering & Procurement
AC1-118Westmoreland 34.5kVIn Service
AC1-158Spotsylvania 500kVIn Service
AC1-164Chickahominy 230kVPartially in Service - Under Construction
AC1-191Elmont 115kVEngineering & Procurement
AC2-137Elko 34.5kVIn Service
AC2-138Northern Neck 34.5kVIn Service
AD1-041Harmony Village-Shackleford 115 kVIn Service
AD1-063Harmony Village 34.5 kVIn Service
AD1-105Kings Dominion DP 115 kVUnder Construction
AD1-115Mountain Run-Mitchell 115 kVWithdrawn
AD2-030Wan 34.5 kVIn Service
AD2-073Sanders DP 230 kVIn Service
AD2-074Garner DP-Lancaster 115 kVUnder Construction
AD2-179Morgans Cut-Glen Lyn 138kVWithdrawn
AE1-074Winterpock 34.5 kVUnder Construction
AE1-075Powhatan 34.5 kVIn Service
AE1-108Bremo-Scottsville 138 kVUnder Construction
AE1-155Garner-Northern Neck 115 kVIn Service
AE1-175Light Foot 34.5 kVIn Service
AE1-190Harmony Village-Shackleford 115 kVIn Service
AE1-191Harmony Village-Shackleford 115 kVIn Service
AE1-212Grandview-Clifftop 138 kVSuspended
AE2-005Harmony Village-Shackleford 115 kVSuspended
AE2-092Kidds Store-Sherwood 115 kVEngineering & Procurement
AE2-140Axton-Danville 138 kVSuspended
AE2-160Kanawha River 138 kVEngineering & Procurement
AE2-166Stockton 138 kVSuspended
AE2-326Jacksons Ferry 138 kVEngineering & Procurement
AF1-014Harmony Village-Shackleford 115 kVSuspended
AF1-042Garner DP-Lancaster 115 kVEngineering & Procurement
AF1-049Berry Hill 138 kVUnder Construction
AF1-114Oak Grove-Dahlgren 230 kVEngineering & Procurement
AF1-130Inez 138 kVSuspended
AF1-162Inez 138 kVEngineering & Procurement
AF2-013Arnold's Corner-Dahlgren 230 kVEngineering & Procurement
AF2-018Inez 138 kVEngineering & Procurement
AF2-054Wan 34.5 kVIn Service
AF2-085Midlothian 34.5 kVIn Service
AF2-091Oak Grove-Dahlgren 230 kVEngineering & Procurement
AF2-106Hazel Hollow-Glen Lyn #1 138 kVEngineering & Procurement
AF2-144Powhatan 34.5 kVIn Service
AF2-382Hurley 69 kVEngineering & Procurement
AG1-038Garner DP-Lancaster 115 kVEngineering & Procurement
AG1-145Lightfoot 34.5 kVIn Service
AG1-152Remington CT 230 kVEngineering & Procurement
AG1-282Dunnsville 34.5 kVWithdrawn
AG1-469Gordonsville 34.5 kVWithdrawn
AG1-508Point Lookout 69 kVWithdrawn
AG1-558Buckner 34.5 kVWithdrawn
AG1-559Caroline Pines 22 kVWithdrawn
AG2-088Midlothian 230 kVActive
AG2-184Harbert Metering 138 kVActive
AG2-272Berry Hill 138 kVActive
AG2-360Broadford 138 kVActive
AG2-518Tech Drive 138 kVActive
AG2-568Stink Run - Sundial 138 kVActive
AH1-072Red Onion - VC5 69 kVActive
AH1-073Red Onion - VC5 69 kVActive
AH1-098Wolf Glade-West Carroll 138 kVActive
AH1-133Saltville - Tazewell 138 kVActive
AH1-144Peter's Mountain 138 kVActive
AH1-145Peter's Mountain 138 kVActive
AH1-188Pigeon Creek 138 kVActive
AH1-227Flemming - Fremont 69 kVActive
AH1-251Todds Tavern- Spotsylvania/Goldsdale 115kVActive
AH1-263Chancellor 115 kVActive
AH1-269Claytor 138 kVActive
AH1-348Pound 34.5 kVActive
AH1-461Buckhorn 138 kVActive
AH1-535Nagel - Cane River 230 kVActive
AH1-617Harbert Metering 138 kVActive
AH1-721Laurel-Cooper 161 kVActive

Affected System - PJM Identified Violations

As part of PJM's analysis, per Tariff Part VII.G.336 & Manual 14H, Section 13, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In accordance with PJM Tariff Part VII, Subpart D, section 310.A and as outlined in PJM Manual 14H, Sections 4.5 and 13, in Phase II of the Cycle, PJM provides the Affected System Operator any updates on the PJM projects that require an Affected Systems Study based on their response at DP1. New Service Requests that require an Affected Systems Study are required to enter into an Affected Systems Study Agreement with the Affected System Operator, as applicable, prior to the close of DP2 or they will be withdrawn from the Cycle.

If the Project Developer already entered into the necessary agreement and the results are available, PJM will supply them in the Phase II SIS report. See below for the status of any required Affected Systems Study. A status of “Pending” means that the study is not yet completed by the Affected System Operator. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

No cost allocated system reinforcements were identified for this project in the Phase II System Impact Study load flow analysis.

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: b4000.344
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.344
Title
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from North Anna substation (bypassing Ladysmith Substation) to a new substation called Thornburg (formerly Kraken). New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.345
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.345
Title
Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Description
Build a 500kV line from a new substation called Thornburg (formerly Kraken) to a new substation called Yeat. New conductor to have a minimum summer normal rating of 4357MVA.
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.346
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.346
Title
Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substation
Description
Cut-in 500kV line from Thornburg (formerly Kraken) substation into Yeat substation
Cost Information
Time Estimate
Jun 01 2029

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.348
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.348
Title
Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers.
Description
Build a new 500/230kV substation called Thornburg (formerly Kraken). The 500kV, 5000A ring bus will be set up for a redundant breaker configuration. Install (2) 1400MVA 500/230 kV transformers. A new redundant breaker ring will be added at Thornburg (formerly Kraken) to accommodate the new 500kV line from North Anna to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Jun 01 2029

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.349
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.349
Title
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).
Description
Update relay settings at Ladysmith to change the destination of 500kV line #568 from Possum Point to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.350
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.350
Title
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).
Description
Update relay settings at Possum Point to change the destination of 500kV line #568 from Ladysmith to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.351
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.351
Title
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).
Description
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating Line #9517 Ladysmith to Thornburg (formerly Kraken).
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.355
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b4000.355
Title
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
Description
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 69.3 miles in AEP section).
Cost Information
Time Estimate
Jun 01 2029

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b4000.352
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.352
Title
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.
Description
Cut in Line #568 Ladysmith - Possum Point into Thornburg (formerly Kraken), creating new Line #568 Thornburg (formerly Kraken) to Possum Point.
Cost Information
Time Estimate
Sep 16 2030

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.356
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.356
Title
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
Description
Build a new 156 mile 765kV line from Joshua Falls – Yeat. (Roughly 86.7 miles in Dominion section).
Cost Information
Time Estimate
Jun 01 2029

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b4000.357
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.357
Title
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Description
Build a new 765/500/230 kV substation called Yeat. Install (2) 765/500 kV transformers. Cut in 500 kV line Bristers-Ox and 500 kV line Meadowbrook-Vint Hill into Yeat.
Cost Information
Time Estimate
Jun 01 2029

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.341
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.341
Title
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV Substation and extend approximately 0.2 miles of conductor to fly-over the site.
Description
Remove the 500 kV conductor previously planned to terminate into the Vint Hill 500 kV substation and extend approximately 0.2 miles of conductor to fly-over the site.
Cost Information
Time Estimate
Jul 13 2029

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.342
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4000.342
Title
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Description
Remove the terminal equipment and substation work required for the termination of the Morrisville-Wishing Star 500 kV line into Vint Hill.
Cost Information
Time Estimate
Jul 13 2029

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformerDVP_P4-2: H2T557_SRT-S
No new ratings for this Flowgate.

System Reinforcement: b4000.251
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b4000.251
Title
Replace the wave trap and upgrade the relay at Cloverdale 765kV substation
Description
Replace the wave trap and upgrade the relay at Cloverdale 765kV substation
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
05JOSHUA-05CLOVRD_RJO 765.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A4047.0 MVA
(All)B4571.0 MVA

System Reinforcement: b4000.252
Type
Load Flow
TO
AEP
RTEP ID / TO ID
b4000.252
Title
Replace the wave trap and upgrade the relay at Joshua Falls 765kV substation
Description
Replace the wave trap and upgrade the relay at Joshua Falls 765kV substation
Cost Information
Time Estimate
Jun 01 2029

Not Contingent

Note: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
05JOSHUA-05CLOVRD_RJO 765.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A4047.0 MVA
(All)B4571.0 MVA

System Reinforcement: b4053.3
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4053.3
Title
Construct a new bipolar +/- 525 kV HVDC link connecting Heritage and Mosby substations, where the link has a capability of transmitting 3,000 MW.
Description
Construct a new bipolar +/- 525 kV HVDC link connecting Heritage and Mosby substations, where the link has a capability of transmitting 3,000 MW. The HVDC link, approximately 185 miles in length, will be fully routed underground between the two new proposed converter stations, one at Heritage and one at Mosby.
Cost Information
Time Estimate
Jun 01 2032

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b4053.4
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4053.4
Title
Design and construct a new Voltage Source Converter (VSC) HVDC station at Heritage substation to support the new HVDC link.
Description
Design and construct a new Voltage Source Converter (VSC) HVDC station at Heritage substation to support the new HVDC link.
Cost Information
Time Estimate
Jun 01 2032

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b4053.5
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4053.5
Title
Design and construct a new Voltage Source Converter (VSC) HVDC station at Mosby substation to support the new HVDC link.
Description
Design and construct a new Voltage Source Converter (VSC) HVDC station at Mosby substation to support the new HVDC link.
Cost Information
Time Estimate
Jun 01 2032

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b4053.12
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4053.12
Title
Install two 500 kV breakers and all associated terminal equipment in the available bay adjacent to existing breaker XT590 to achieve a redundant breaker arrangement.
Description
Install two 500 kV breakers and all associated terminal equipment in the available bay adjacent to existing breaker XT590 to achieve a redundant breaker arrangement. Upgrade existing terminal equipment to 500 kV, 5000A 63 kAIC standards including breaker (XT590), disconnect switches (59078, X74), leads and bus work.
Cost Information
Time Estimate
Jun 01 2030

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b4053.11
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
b4053.11
Title
Cut and loop line No. 5008 into Mosby substation, which will result in two 500 kV lines: line No. 5008 Morrisville-Mosby and line No. 9573 Mosby-Wishing Star.
Description
Cut and loop line No. 5008 into Mosby substation, which will result in two 500 kV lines: line No. 5008 Morrisville-Mosby and line No. 9573 Mosby-Wishing Star.
Cost Information
Time Estimate
Jun 01 2030

Not ContingentTopology Changing

Note 1: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-240 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: n9207.0
Type
Load Flow
TO
Dominion
RTEP ID / TO ID
n9207.0 / TC1-PH2-DOM-018
Title
Replace 6ELMONT 230 kV to 8ELMONT 500 kV circuit 1 with larger transformer (3-480 MVA single phase transformer).
Description
Replace 6ELMONT 230 KV to 8ELMONT 500 kV ckt 1 with Larger XFRM. (3-480 MVA Single Phase XFRM).
Total Cost ($USD)
$38,254,469
Discounted Total Cost ($USD)
$38,254,469
Allocated Cost ($USD)
$0
Time Estimate
Dec 31 2028

Not Contingent

Note: AG2-240 contributes to the loading of an overloaded facility that is being mitigated by a network upgrade that was securitized by a prior Queue/Cycle. AG2-240 is not contingent on this network upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

FacilityContingency
6ELMONT-8ELMONT 230.0/500.0 kV Ckt 1 transformer(Any)
Rating SetRating TypeRating Value
(All)A1707.0 MVA
(All)B1758.0 MVA
(All)C1873.0 MVA

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AG2-240


AG2-240 Contributions into Topology or Eliminated Reinforcements:
TypeTORTEP ID / TO IDTitleTopo or ElimMW ImpactPercent AllocationCategoryAllocated Cost ($USD)
Contributions into Topology or Eliminated Reinforcement Total:$0
AG2-240 Contingent Region Topology Upgrades:
TORTEP IDTitleCategoryAllocated Cost ($USD)
Region Topology Upgrade Total:$0

Attachments

AG2-240 One Line Diagram

AG2-240 One Line Diagram.pdf
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.