AG2-484 Phase II System Impact Study Report

v1.00 released 2026-06-03 18:10

Mifflintown Bus-Mifflintown Tap 69 kV II

4.6 MW Capacity / 0.0 MW Energy

Introduction

This Phase II System Impact Study (SIS) Report has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 310 for New Service Requests (projects) in Transition Cycle 2 (TC2). The Project Developer/Eligible Customer (developer) is Cottontail Solar 5, LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is PPL Electric Utilities Corporation.

Preface

The Phase II System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Phase II System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.5, PJM takes the following actions during the Phase II System Impact Study:

  1. PJM will retool load flow results from the Phase I System Impact Study (summer peak, winter peak and light load) based on decisions made by Project Developers or Eligible Customers during Decision Point I.
  2. PJM will conduct any required voltage analyses.
  3. PJM will perform short circuit and stability analyses as required.
  4. PJM will coordinate with the Affected System to confirm which projects in the PJM Cycle will require Affected System studies. If the Affected System Operator indicates that an Affected System study is required, PJM will:
    1. Notify the Project Developer or Eligible Customer of the need for an Affected System study and the requirement to execute an Affected System study agreement with the impacted Affected System Operator, and;
    2. Include the results of the Affected System Operator’s Affected System Study in the Phase II System Impact Study results, if applicable and available.
  5. The Phase II System Impact Study Results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.

The Transmission Owner takes the following actions during the Phase II System Impact Study:

  1. Verify Interconnection Facilities and Network Upgrades required to accommodate the New Service Request.
  2. Perform a Facilities Study. The Facilities Study in Phase II System Impact Study phase will be for the physical Interconnection Facilities. The Facilities Study requirements are outlined in Attachment C of this manual. The study will be conducted pursuant to Tariff, Part VII, Subpart D, section 307(A)(7) and Tariff, Part VIII, Subpart C, section 404(A)(7).

Decision Point II Requirements

At the close of Phase II System Impact Study, PJM will initiate Decision Point II (DP2). During DP2, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.A. Additional information on these elements is available in PJM Manual 14H sections 4.6, 6, and 7.

Allowable project modifications at Decision Point II are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

Adverse Test Eligibility

This New Service Request does not meet the Adverse Study Impact Criteria and has the option to either move forward in the Cycle process or withdraw at DP2 with Readiness Deposit #1 forfeited. See adverse study impact calculation below.

This section details whether a Project Developer or Eligible Customer qualifies for the Adverse Study Impact clause outlined in the PJM OATT, Part VII, Subpart D, section 311.B and Manual 14H, section 6.2.2. In order to qualify for an Adverse Study Impact at Decision Point II, the Network Upgrade cost from Phase I to Phase II must:

  1. Increase overall by 25% or more
  2. Increases by more than $10,000 per MW (Includes Costs identified in Affected System studies)

If a New Service Request meets the criteria above and chooses to withdraw the request, PJM will refund the cumulative Readiness Deposit amounts paid at the Application Phase and at Decision Point I (RD1 and RD2, respectively).

The below calculations show the computation of this New Service Request's Adverse Study Impact

DP2 Adverse Eligibility = DP2 Adverse Cost Alloc DP1 Adverse Cost Alloc > 1.25 AND ( DP2 Adverse Cost Alloc - DP1 Adverse Cost Alloc ) Project Size > $10,000 per MW
DP2 Adverse Eligibility = $0 $0 = ∞ AND ( $0 - $0 ) 4.6 = $0 per MW

General

The Project Developer has proposed an uprate to a planned/existing Solar facility located in the PPL Electric Utilities Corporation zone — Juniata County, Pennsylvania. This project is an increase to the developer’s AE2-060 project(s), which will share the same Point of Interconnection. The AG2-484 project is a 4.6 MW Capacity only uprate to the previous project(s). The total installed facilities will have a capability of 20.0 MW with 13.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AG2-484
Project Name:
Mifflintown Bus-Mifflintown Tap 69 kV II
Project Developer Name:
Cottontail Solar 5, LLC
State:
Pennsylvania
County:
Juniata
Transmission Owner:
PPL Electric Utilities Corporation
MFO:
20.0
MWE:
0.0
MWC:
4.6
Fuel Type:
Solar
Basecase Study Year:
2028

Physical Interconnection Facility Study

Report Available

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AG2-484 will interconnect on the PPL Electric Utilities Corporation  transmission system at Mifflintown Bus-Mifflintown Tap 69 kV II (AE2-060 TP).

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In Phase II SIS, the interconnected Transmission Owner has performed a facilities study for both the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades. The System Reliability Network Upgrade shown in the table are planning level cost estimates which are subject to change as a result of a facility study performed by the TO during Phase III System Impact Study.

Based on the Phase II SIS results, the AG2-484 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit #3 are also shown below.

Cost Summary
DescriptionCost Allocated to AG2-484Cost Subject to Readiness*Cost Subject to Adverse
Transmission Owner Interconnection Facilities (TOIF)$0$0$0
Other Scope$0$0$0
Option To Build Oversight$0$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$0$0$0
Network Upgrades$0$0$0
System Reliability Network Upgrades
Steady State Thermal & Voltage$0$0$0
Transient Stability$0$0$0
Short Circuit$0$0$0
Transmission Owner Analysis
SubRegional$0$0$0
Distribution$0$0$0
Affected System Reinforcements
AFS - PJM Violations$0$0$0
AFS - Non-PJM Violations$0$0$0
Total$0$0$0

* Contributes to calculation for Readiness Deposit #3 (RD3). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Note 4: Please see the ‘Affected Systems Studies’ section of this Phase II SIS report for details on your project’s need for an Affected Systems Study. If your project requires an Affected Systems Study, the Affected Systems impacts may not be available from the Affected System Operator at the time of the PJM Phase II SIS. Therefore, the cost in this section would not reflect any required upgrades by the Affected System until the study is completed. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 311 (Decision Point II) A.1.b and PJM Manual 14H, section 6.2, Readiness Deposit #3 (RD3) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point II (DP2), the Project Developer or Eligible Customer is required to submit Readiness Deposit #3, which is calculated as 20% of cost allocation for required Phase II Network Upgrades minus Readiness Deposit #1 & Readiness Deposit #2.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Note 4: Readiness Deposit #3 can be zero, but may not be a negative number.

Readiness Deposit #3 Due for Project AG2-484

Readiness Deposit #3 has been calculated for the project based on the Phase II System Impact Study results and is shown in the table below. This Readiness Deposit #3 must be provided at Decision Point II through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit #3 Due for AG2-484
Project ID: AG2-484
20% of cost allocation for Phase II Network Upgrades:(A) $0
Sum of Readiness Deposit #1 & Readiness Deposit #2 Received:(B) $20,000
Readiness Deposit #3 (RD3) due at DP2:(A) - (B) = $0
Note: Failure to provide an acceptable form of Readiness Deposit #3 by the end of Decision Point II will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

No TO Interconnection Facilities or Physical Network Upgrades are required for this project.

Transmission Owner Analysis

No impacts identified by Transmission Owner

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. PPL interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Meteorological Data Reporting Requirement
The solar generation facility shall provide the Transmission Provider with site-specific meteorological data including:
  • Temperature (degrees Fahrenheit)
  • Atmospheric Pressure (hectopascals)
  • Irradiance
  • Forced outage data
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AG2-484 was evaluated as a 0.0 MW (4.6 MW Capacity) injection in the PPL area.

AG2-484 was evaluated as part of a plant. The plant consists of AG2-484. The total Energy output of the plant was evaluated at its maximum seasonal capability of 20.0 MW (0.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2PJM
CNASTONE-BRIGHTON 500.0 kV Ckt 1 line
AP_P1-2_PE-500-3835T_SRT-A
SingleAC116.99 %3098.0B3624.44
0.58
GD2PJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P1-2_PE-500-3835T_SRT-A
SingleAC136.68 %3620.0B4947.73
0.64

Details for CNASTONE-BRIGHTON 500.0 kV Ckt 1 line l/o AP_P1-2_PE-500-3835T_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PJM
Facility Description:
CNASTONE-BRIGHTON 500.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-3835T_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:116.99 %
Rating:3098.0 MVA
Rating Type:B
MVA to Mitigate:3624.44
MW Contribution:
0.58
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
200052ROCKSP 1
50/50
2.048
200053ROCKSP 2
50/50
2.008
200054ROCKSP 3
50/50
2.072
200055ROCKSP 4
50/50
2.036
200203Y1-065-STG
50/50
5.638
200204Y1-065-CTG1
50/50
3.255
200205Y1-065-CTG2
50/50
3.255
3147043LAWRENC
Solar/Wind Helper
0.137
3147133PAMPLIN
Solar/Wind Helper
0.715
3147133PAMPLIN
Solar/Wind Helper
0.182
3147133PAMPLIN
Solar/Wind Helper
0.228
20334726NME_Y1-047
Adder
2.07
20390726Y2-042
Adder
2.283
23546401DTGZ2-030
Solar/Wind Helper
0.076
20486527WR_V4-052
Adder
0.884
20628028LAKEHURS
Adder
0.793
20633028GILCT9
Adder
23.712
20635828PARLN1&2
Adder
2.791
20635828PARLN1&2
Adder
6.162
20635928PARLN3&4
Adder
2.791
20635928PARLN3&4
Adder
6.162
20636028O CRK C1
Adder
5.899
20636128O CRK C2
Adder
5.379
20714828MDF_W3-079
Solar/Wind Harmer
0.082
213497CHSTR7-9
Adder
2.328
213497CHSTR7-9
Adder
2.328
213497CHSTR7-9
Adder
2.328
213535CROYDN11
Adder
8.601
213560DLW11-12
Adder
2.297
213560DLW11-12
Adder
2.297
213561DLWR9-10
Adder
3.004
213561DLWR9-10
Adder
2.297
213587EDDYSTN3
Adder
67.984
213589EDDYSTN4
Adder
67.989
213611FALLS1-3
Adder
2.963
213611FALLS1-3
Adder
2.963
213611FALLS1-3
Adder
2.963
213815MOSER1-3
Adder
2.986
213815MOSER1-3
Adder
2.986
213815MOSER1-3
Adder
2.986
213942SCHUYLKILL
Adder
2.309
213942SCHUYLKILL
Adder
3.019
213957STHWK3-4
Adder
2.308
213957STHWK3-4
Adder
2.308
213958STHWK5-6
Adder
2.308
213958STHWK5-6
Adder
2.308
214194N WALES4
Adder
0.714
231907DC10
Adder
3.374
231917EM10
Adder
2.231
231918WEST 1
Adder
3.192
231919CHRIST1
Adder
4.197
231920CHRIST2
Adder
4.104
231940T-011
Adder
0.724
232404W1-003 C
Solar/Wind Harmer
0.627
232408W1-005 C
Solar/Wind Harmer
0.627
232410W1-006 C
Solar/Wind Harmer
0.627
232813VAUGHN
Adder
0.57
232901NORTHST
Adder
8.082
232902EASTMUNI
Adder
12.63
232904IR4
Adder
78.494
232907VN8
Adder
29.155
232912OH NUG1
Adder
8.575
232913OH NUG2
Adder
8.461
232914OH NUG3
Adder
8.575
232915OH NUG4
Adder
8.518
232916OH NUG5
Adder
8.575
232917OH NUG6
Adder
8.537
232918OH NUG7
Adder
8.518
232919VN10
Adder
2.724
232920IR10
Adder
3.068
232921TASLEY2G
Adder
5.012
232926CRISFLD1
Adder
1.906
23777901MDS_W4-102
Solar/Wind Helper
0.141
3137176SLIGO L2192
Solar/Wind Helper
0.962
3141426STAFORD
Solar/Wind Helper
0.062
3141906WESTMOR
Solar/Wind Helper
0.103
3142416OLDCHRC
Solar/Wind Helper
0.654
3142416OLDCHRC
Solar/Wind Helper
0.25
3142433PROV 92
Solar/Wind Helper
1
3142956BIRDNECK
Solar/Wind Helper
0.164
3143316POE
Solar/Wind Helper
0.966
3144356SAPONY
Solar/Wind Helper
0.428
3145506HICKORY
Solar/Wind Helper
0.97
3145506HICKORY
Solar/Wind Helper
0.582
3145506HICKORY
Solar/Wind Helper
0.145
3146386ELIZ CT
Solar/Wind Helper
0.241
3146776BUCKING
Solar/Wind Helper
0.928
3146776BUCKING
Solar/Wind Helper
0.075
3146776BUCKING
Solar/Wind Helper
0.083
3146776BUCKING
Solar/Wind Helper
0.093
209027LOR2_Q27
Solar/Wind Harmer
0
217083KRNY_132
Adder
7.69
217083KRNY_132
Adder
7.739
217086KRNY_131
Adder
7.755
217086KRNY_131
Adder
7.673
217146KRNY_1234
Adder
7.213
217146KRNY_1234
Adder
7.164
217147KRNY_1212
Adder
7.361
217147KRNY_1212
Adder
7.23
217167KRNY_14
Adder
7.739
217186ESSEX_G9
Adder
3.286
218418LINDEN_G5
Adder
14.298
218419LINDEN_G6
Adder
14.298
219035LINDEN_G8
Adder
13.726
219036LINDEN_G7
Adder
13.925
228200CARL#1CT
Adder
5.617
228201CARL#2CT
Adder
5.906
228206SHRMN CT
Adder
14.258
228251CARLLS#4
Adder
0.542
228307PCLP GT
Adder
10.356
228400MICK 1CT
Adder
10.092
235020AA1-095 C
Solar/Wind Helper
0.042
316075AC2-137 C
Solar/Wind Helper
0.383
316077AC2-138 C
Solar/Wind Helper
0.24
20462827N BANGR8
Adder
0.599
228732V1-021 C
Adder
0.163
3138133OCRAN
Solar/Wind Helper
0.075
3138133OCRAN
Solar/Wind Helper
0.151
3141766HARMONY
Solar/Wind Helper
0.05
3141783LANCAST
Solar/Wind Helper
0.151
3141783LANCAST
Solar/Wind Helper
0.101
3141813NORNECK
Solar/Wind Helper
0.255
3141913WHIT STONE
Solar/Wind Helper
0.251
3143226MDLTHAN
Solar/Wind Helper
0.249
3143873LANEXA
Solar/Wind Helper
0.15
3145273HOLLAND
Solar/Wind Helper
0.179
3146376EDENTON
Solar/Wind Helper
0.237
3146456SLIGO L269
Solar/Wind Helper
0.242
3146456SLIGO L269
Solar/Wind Helper
0.242
3146486SUNBURY
Solar/Wind Helper
0.24
3146486SUNBURY
Solar/Wind Helper
0.24
3146516WINFALL
Solar/Wind Helper
0.239
3146516WINFALL
Solar/Wind Helper
0.239
3146516WINFALL
Solar/Wind Helper
0.776
3146516WINFALL
Solar/Wind Helper
0.239
3146516WINFALL
Solar/Wind Helper
0.239
3146516WINFALL
Solar/Wind Helper
0.239
3146626S HERTFORD
Solar/Wind Helper
0.239
3146626S HERTFORD
Solar/Wind Helper
0.239
3146626S HERTFORD
Solar/Wind Helper
0.239
3146926FARMVIL
Solar/Wind Helper
0.138
3146926FARMVIL
Solar/Wind Helper
0.138
3147666LOUISA
Solar/Wind Helper
1.041
3147666LOUISA
Solar/Wind Helper
0.599
3147983MERCK5
Solar/Wind Helper
0.09
200034PCHBTM 2
50/50
16.321
200035PCHBTM 3
50/50
16.185
232406W1-004 FULL
Solar/Wind Harmer
0.627
200192DELTA CT1
50/50
1.564
200193DELTA CT2
50/50
1.564
200194DELTA CT3
50/50
1.564
200195DELTA ST
50/50
2.416
3141726DUNNSVL
Solar/Wind Helper
1.017
3145663CRESWEL
Solar/Wind Helper
0.657
316034AC1-036 C
Solar/Wind Helper
0.237
316036AC1-147 C
Solar/Wind Helper
0.371
316059AD1-063 C
Solar/Wind Helper
0.253
316159AE1-175 C
Solar/Wind Helper
0.376
316240AF1-291 C
Solar/Wind Helper
0.333
316246AF1-032 C
Solar/Wind Helper
0.277
316258AE1-075 C
Solar/Wind Helper
0.334
316305AF2-043 C
Solar/Wind Helper
0.326
316315AB2-025 C
Solar/Wind Helper
0.365
316316AC1-027 C
Solar/Wind Helper
0.384
316317KELFORD C
Solar/Wind Helper
0.205
316382AG1-145 C
Solar/Wind Helper
0.334
316405AF2-144 C
Solar/Wind Helper
0.278
208909MACR G3
Adder
132.999
209008PAXT IPP
Adder
1.596
209010PEIP 1
Adder
2.843
209010PEIP 1
Adder
0.416
209010PEIP 1
Adder
0.517
209018SUNBIPCT
Adder
5.767
209023WIENIPP1
Adder
8.772
209025WIENIPP3
Adder
4.29
209025WIENIPP3
Adder
4.379
209026WIENIPP4
Adder
4.334
209030FRFA O01
Adder
0.191
232899W1-062
Adder
9.333
232900DEMECSMY
Adder
8.952
232905CHERITON_25
Adder
2.382
218524CNTRALGAS1 C
Solar/Wind Harmer
0.636
218526CNTRALGAS2 C
Solar/Wind Harmer
0.637
226910AB2-157 C
Solar/Wind Helper
0.017
233939AC1-091 C
Solar/Wind Harmer
1.751
233970AC1-092 C
Solar/Wind Harmer
1.751
233971AC1-093 C
Solar/Wind Harmer
1.751
233972AC1-094 C
Solar/Wind Harmer
1.751
233973AC2-185 C
Solar/Wind Harmer
1.751
212507AE2-042_GEN
Solar/Wind Harmer
0.479
3130156CHOWAN
Solar/Wind Helper
0.237
3130156CHOWAN
Solar/Wind Helper
0.237
3130156CHOWAN
Solar/Wind Helper
0.237
3145336SMITFLD
Solar/Wind Helper
0.977
3145336SMITFLD
Solar/Wind Helper
0.098
3148133STUARTS
Solar/Wind Helper
0.134
3141196NOKESVL
Solar/Wind Helper
1.13
3141873WAN 176
Solar/Wind Helper
0.05
3143526WINTERP
Solar/Wind Helper
1.298
3143526WINTERP
Solar/Wind Helper
1.298
316411AF1-147_GEN1
Solar/Wind Helper
0.977
316415AF1-147_GEN2
Solar/Wind Helper
0.977
316404AE1-155 C
Solar/Wind Helper
2.169
316017AA1-139 ULT1
Solar/Wind Helper
1.109
316018AA1-139 ULT2
Solar/Wind Helper
1.043
316181AB2-040 GEN
Solar/Wind Helper
1.646
316033AB2-134 GEN
Solar/Wind Helper
0.853
316388AE2-253 GEN
Solar/Wind Helper
0.924
205956AE1-196_GEN
Solar/Wind Harmer
0.024
3148013FISHERV
Solar/Wind Helper
0.128
3148013FISHERV
Solar/Wind Helper
0.224
3145176PASQUOTANK
Solar/Wind Helper
0.149
3132123MT JACKSON
Solar/Wind Helper
0.715
3132273ORANGE
Solar/Wind Helper
0.052
3142543TWELFTH
Solar/Wind Helper
0.024
3144303KENBRDG
Solar/Wind Helper
0.181
238175AF1-290_GEN
Solar/Wind Helper
0.138
238169AE2-226 GEN1
Solar/Wind Helper
0.616
238170AE2-226 GEN2
Solar/Wind Helper
0.616
316005AA1-067
Solar/Wind Helper
0.255
316426AA2-053 GEN
Solar/Wind Helper
1.305
316190AA2-174 GEN
Solar/Wind Helper
0.015
315614AA2-178 GEN
Solar/Wind Helper
1.434
315816AE2-034 GEN
Solar/Wind Helper
1.075
316312AB1-027
Solar/Wind Helper
0.48
316011AB1-132 GEN
Solar/Wind Helper
2.46
316369SG1_INVT
Solar/Wind Helper
1.187
315651AD1-115 GEN
Solar/Wind Helper
0.907
316023GEN1_S
Solar/Wind Helper
0.885
316365GEN2_N
Solar/Wind Helper
0.885
237061AD1-155 GEN
Solar/Wind Helper
1.511
316463AE2-346 GEN
Solar/Wind Helper
0.211
315839AE2-212 C
Solar/Wind Helper
0.331
233984AB2-036 GEN
Solar/Wind Harmer
7.033
233915AB1-141 GEN
Solar/Wind Harmer
0.246
233918AB1-142 GEN
Solar/Wind Harmer
0.246
315821AE2-092 GEN
Solar/Wind Helper
2.119
316499AE2-029_GEN
Solar/Wind Helper
0.755
315671AE2-027_GEN
Solar/Wind Helper
1.993
233930AB2-032 GEN
Solar/Wind Harmer
0.924
233987AB2-037 GEN
Solar/Wind Harmer
-0.001
315662AE1-191 GEN
Solar/Wind Helper
1.35
315666AE1-190 GEN
Solar/Wind Helper
0.338
319010AE1-072 C
Solar/Wind Helper
2.768
315697AD1-025 GEN
Solar/Wind Helper
2.817
316185AD1-033 GEN
Solar/Wind Helper
1.145
315773AC2-141 GEN
Solar/Wind Helper
5.26
316280AD1-041 GEN
Solar/Wind Helper
0.844
233935AB2-179 C
Solar/Wind Harmer
1.314
234041AC1-190 GEN
Solar/Wind Harmer
7.072
315732AD1-074 GEN1
Solar/Wind Helper
2.665
315733AD1-074 GEN2
Solar/Wind Helper
2.665
315735AD1-075 GEN1
Solar/Wind Helper
1.333
315737AD1-076 GEN
Solar/Wind Helper
2.279
316473AC1-191 GEN
Solar/Wind Helper
1.549
316478AD1-087 GEN
Solar/Wind Helper
1.113
316486AD2-202 GEN
Solar/Wind Helper
0.326
316447AC1-158 HLD
Solar/Wind Helper
3.306
316044AC1-158 PL1
Solar/Wind Helper
1.502
316045AC1-158 PL2
Solar/Wind Helper
4.808
316450AC1-158 RIC
Solar/Wind Helper
0.401
316468AD1-105 GEN
Solar/Wind Helper
1.243
316072AD1-144
Solar/Wind Helper
0.278
316156AD2-030 GEN
Solar/Wind Helper
0.379
315785AD2-033 C
Solar/Wind Helper
2.634
316337AD2-073 GEN
Solar/Wind Helper
0.39
233968AD2-076_GEN
Solar/Wind Harmer
2.247
234012AE2-112_GEN
Solar/Wind Harmer
2.247
234014AF1-036_GEN
Solar/Wind Harmer
2.247
207522AF2-254 C
Solar/Wind Harmer
0.775
207528AF2-192 GEN
Solar/Wind Harmer
0.598
207442AE1-156 GEN
Solar/Wind Harmer
0.049
226929AD2-058 GEN
Solar/Wind Helper
0.119
207437AD2-070 GEN
Solar/Wind Harmer
0.055
313526AB2-022
Solar/Wind Helper
0.368
316313AB2-026
Solar/Wind Helper
0.371
209120AE2-241 GEN
Solar/Wind Harmer
1.275
209093AE2-110 GEN
Solar/Wind Harmer
1.275
3145513AHOSKIE
Solar/Wind Helper
0.23
3145513AHOSKIE
Solar/Wind Helper
0.103
230430AE1-229_GEN
Solar/Wind Harmer
17.026
219304NAMERICA C
Solar/Wind Harmer
0.076
231902DC CT7
Adder
10.805
231906DC3 NUG
Adder
13.515
208862AG1-362 C
Solar/Wind Harmer
0.49
209130AF1-271A GEN
Solar/Wind Harmer
1.519
209142AF1-226 GEN
Solar/Wind Harmer
2.23
205932AD2-116_GEN
Solar/Wind Harmer
0.072
205941AD2-115 GEN
Solar/Wind Harmer
0.095
205943AE1-185 GEN
Solar/Wind Harmer
0.024
205967AE2-211_GEN
Solar/Wind Harmer
3.973
205951AE1-129_GEN
Solar/Wind Harmer
0.111
20465427SHAW CT
Adder
3.217
20464827MOUNT CT
Adder
1.879
20464827MOUNT CT
Adder
1.936
3145746EVERETS
Solar/Wind Helper
0.223
3145746EVERETS
Solar/Wind Helper
0.223
3145746EVERETS
Solar/Wind Helper
0.223
3145746EVERETS
Solar/Wind Helper
0.223
3145746EVERETS
Solar/Wind Helper
0.886
3145746EVERETS
Solar/Wind Helper
0.223
3145746EVERETS
Solar/Wind Helper
0.223
3145746EVERETS
Solar/Wind Helper
0.223
3146206CASHIE
Solar/Wind Helper
0.232
3146206CASHIE
Solar/Wind Helper
0.232
3146206CASHIE
Solar/Wind Helper
0.232
3142666NORTHAMPTON
Solar/Wind Helper
0.228
3142666NORTHAMPTON
Solar/Wind Helper
0.228
3142666NORTHAMPTON
Solar/Wind Helper
0.228
3142666NORTHAMPTON
Solar/Wind Helper
0.137
3142666NORTHAMPTON
Solar/Wind Helper
0.228
316274AC1-208 GEN
Solar/Wind Helper
1.37
316349AD2-085 GEN
Solar/Wind Helper
1.109
3156021HOLLOMANSOL
Solar/Wind Helper
1.758
313506AB2-031 GEN
Solar/Wind Helper
1.042
316006AB2-029 C
Solar/Wind Helper
0.131
316322AB2-045
Solar/Wind Helper
0.259
316131AB2-060 GEN
Solar/Wind Helper
1.369
316192AB2-158 GEN
Solar/Wind Helper
1.752
316174AB2-169 GEN
Solar/Wind Helper
0.583
316087AB2-174 GEN
Solar/Wind Helper
1.607
316132AB2-190 GEN1
Solar/Wind Helper
1.413
316458AB2-190 GEN2
Solar/Wind Helper
1.413
316129AC1-054 GEN
Solar/Wind Helper
1.116
316210AC1-098 GEN
Solar/Wind Helper
1.818
316212AC1-099_GEN
Solar/Wind Helper
1.01
316375AC2-012 GEN
Solar/Wind Helper
0.64
316339AD2-160 GEN
Solar/Wind Helper
0.924
316164AC1-076 GEN
Solar/Wind Helper
1.281
20635028RRCT1&2
Adder
9.813
20635028RRCT1&2
Adder
9.662
20635128RRCT3&4
Adder
9.327
20635128RRCT3&4
Adder
8.136
316239AB2-077_GEN
Solar/Wind Helper
0.302
316238AB2-078_GEN
Solar/Wind Helper
0.302
316237AB2-079_GEN
Solar/Wind Helper
0.302
316140AB2-099
Solar/Wind Helper
0.088
316223AC1-118
Solar/Wind Helper
0.395
316294AC1-161 GEN
Solar/Wind Helper
4.47
315975AC1-164 GENB
Solar/Wind Helper
0.095
315976AC1-164 GENA
Solar/Wind Helper
3.228
316169AC1-164_GENC
Solar/Wind Helper
2.788
316381AD1-082 GEN
Solar/Wind Helper
1.264
316233AE1-074 FULL
Solar/Wind Helper
0.381
316236AE1-162_GEN
Solar/Wind Helper
0.329
315607AA1-063A GEN
Solar/Wind Helper
1.314
20465027TOLNA CT
Adder
2.278
20465027TOLNA CT
Adder
2.369
20465527S.RDG CT
Adder
2.194
20465527S.RDG CT
Adder
2.267
20466127PORT 5CT
Adder
22.122
20465127PORT CT
Adder
2.507
20465127PORT CT
Adder
3.327
3130546PLYMOUTH
Solar/Wind Helper
0.233
3145593CAROLNA
Solar/Wind Helper
0.228
3145593CAROLNA
Solar/Wind Helper
0.228
3145683EARLEYS
Solar/Wind Helper
0.23
3145683EARLEYS
Solar/Wind Helper
0.23
3145683EARLEYS
Solar/Wind Helper
0.23
3145683EARLEYS
Solar/Wind Helper
0.46
200200DELTA2 CT1
50/50
2.799
200201DELTA2 CT2
50/50
2.799
200202DELTA2 ST
50/50
4.74
232432Z2-076 GEN
Solar/Wind Harmer
0.013
232434Z2-077 GEN
Solar/Wind Harmer
0.04
3130086AYDLETT
Solar/Wind Helper
0.966
3137643SOCKMAN
Solar/Wind Helper
0.912
3138216PACIFIC
Solar/Wind Helper
0.049
3138266HYDRAULIC
Solar/Wind Helper
0.007
3138266HYDRAULIC
Solar/Wind Helper
0.01
3142946ENON
Solar/Wind Helper
0.025
3142946ENON
Solar/Wind Helper
0.083
3144536CHRHLND
Solar/Wind Helper
0.037
3144873MCLAUGH
Solar/Wind Helper
0.006
3145783HORNRTN
Solar/Wind Helper
0.227
3145796HORNRTN
Solar/Wind Helper
0.68
3145796HORNRTN
Solar/Wind Helper
0.748
3145796HORNRTN
Solar/Wind Helper
0.227
3145796HORNRTN
Solar/Wind Helper
0.227
3145796HORNRTN
Solar/Wind Helper
0.907
3145796HORNRTN
Solar/Wind Helper
0.726
3145796HORNRTN
Solar/Wind Helper
0.091
3145823KELFORD
Solar/Wind Helper
0.228
3145823KELFORD
Solar/Wind Helper
0.228
3145893MURPHYS
Solar/Wind Helper
0.332
3145893MURPHYS
Solar/Wind Helper
0.417
3145893MURPHYS
Solar/Wind Helper
0.083
3145893MURPHYS
Solar/Wind Helper
0.232
3145893MURPHYS
Solar/Wind Helper
0.927
3145893MURPHYS
Solar/Wind Helper
0.232
3145893MURPHYS
Solar/Wind Helper
0.625
3145933PARMELE
Solar/Wind Helper
0.449
3145933PARMELE
Solar/Wind Helper
0.224
3145933PARMELE
Solar/Wind Helper
0.224
3145963POPLR C
Solar/Wind Helper
0.228
3145963POPLR C
Solar/Wind Helper
0.228
3146033SCOT NK
Solar/Wind Helper
0.905
3146043SEABORD
Solar/Wind Helper
0.23
3146173TUNIS
Solar/Wind Helper
0.231
3146173TUNIS
Solar/Wind Helper
0.231
3146173TUNIS
Solar/Wind Helper
0.231
3146173TUNIS
Solar/Wind Helper
0.231
3146263WOODLND
Solar/Wind Helper
0.229
3146263WOODLND
Solar/Wind Helper
0.229
315611Z1-036_GEN2
Solar/Wind Helper
1.306
315800Z1-036_GEN1
Solar/Wind Helper
1.306
316320Y1-086
Solar/Wind Helper
0.108
316321Z2-027
Solar/Wind Helper
0.367
942461AE2-259 GEN
Solar/Wind Helper
1.545
946281AF1-292 GEN
Solar/Wind Helper
0.231
961541AF2-445A GEN
Solar/Wind Harmer
1.807
961941AG1-037 GEN
Solar/Wind Helper
0.078
963071AG1-156 GEN
Solar/Wind Harmer
6.123
963391AG1-188 GEN
Solar/Wind Harmer
1.527
963401AG1-189 GEN
Solar/Wind Harmer
0.938
966871AG1-558 GEN
Solar/Wind Helper
0.342
966881AG1-559 GEN
Solar/Wind Helper
0.354
970025AG2-016 GEN
Solar/Wind Harmer
1.528
970095AG2-074 GEN
Solar/Wind Harmer
4.061
970453AG2-297 GEN
Solar/Wind Harmer
2.193
970597AG2-380 GEN
Solar/Wind Harmer
4.024
970695AG2-447 GEN
Solar/Wind Harmer
2.427
970753AG2-477 GEN
Solar/Wind Harmer
0.06
970755AG2-478 GEN
Solar/Wind Harmer
0.059
970757AG2-479 GEN
Solar/Wind Harmer
0.61
970761AG2-481 GEN
Solar/Wind Harmer
0.614
970997AG2-616 GEN
Solar/Wind Harmer
6.191
971007AG2-625 GEN
Solar/Wind Harmer
1.387
971009AG2-626 GEN
Solar/Wind Harmer
0.885
971189AH1-054 GEN
Solar/Wind Harmer
0.636
971195AH1-057 GEN
Solar/Wind Harmer
0.607
971519AH1-257 GEN
Solar/Wind Harmer
1.362
971521AH1-258 GEN
Solar/Wind Harmer
1.456
971667AH1-334 GEN
Solar/Wind Harmer
1.481
219221BRL12CT1
Adder
7.507
219222BRL12CT2
Adder
7.507
219223BRL12CT3
Adder
7.507
219224BRL12CT4
Adder
7.507
227287AC2-120 GEN
Solar/Wind Helper
0.416
316431W1029_GEN1
Solar/Wind Helper
0.969
316433W1029_GEN2
Solar/Wind Helper
0.969
316435W1029_GEN3
Solar/Wind Helper
0.969
957601AF2-054 GEN
Solar/Wind Helper
0.336
957831AF2-077 GEN
Solar/Wind Helper
0.335
964001AG1-254 GEN
Solar/Wind Harmer
4.839
964211AG1-282 GEN
Solar/Wind Helper
0.343
966001AG1-469 GEN
Solar/Wind Helper
0.276
966261AG1-495 GEN
Solar/Wind Harmer
1.431
966621AG1-532 GEN
Solar/Wind Helper
0.209
972141AH1-641 GEN
Solar/Wind Harmer
1.34
972177AH1-672 GEN
Solar/Wind Harmer
9.886
972221AH1-695 GEN
Adder
108.273
972233AH1-701 GEN
Adder
3.587
972237AH1-703 GEN
Adder
8.423
972251AH1-710 GEN
Adder
42.883
972275AH1-722 GEN
Adder
26.286
200917MEHOOPANY_G
Solar/Wind Harmer
0.308
970767AG2-484 GEN
Solar/Wind Harmer
0.585
972281AH1-725 GEN
50/50
137.55
972260AH1-715 GEN1
Adder
11.449
972261AH1-715 GEN2
Adder
13.33
238147AE2-230_GEN1
Solar/Wind Helper
0.421
238148AE2-230_GEN2
Solar/Wind Helper
0.421
238149AF1-291A_GEN
Solar/Wind Helper
0.12
238152AF2-075_GEN
Solar/Wind Helper
0.602
230422AE1-104_GEN1
Solar/Wind Harmer
11.603
230425AE1-104_GEN2
Solar/Wind Harmer
11.603
232422X3-066 FULL
Solar/Wind Harmer
0.08
234033AF1-007_GEN
Solar/Wind Harmer
13.407
316487AF1-042 GEN
Solar/Wind Helper
0.255
316484AD2-074 GEN
Solar/Wind Helper
0.488
207500AE2-000G1
Solar/Wind Harmer
10.554
207497AE2-000G2
Solar/Wind Harmer
10.554
207507AE2-000G3
Solar/Wind Harmer
10.554
207487AE2-000G4
Solar/Wind Harmer
10.554
217121ECCF
Adder
0.362
232910NRG_G1
Adder
8.361
CBM NorthLTFEXP_CBM-N->PJM
CBM
65.754
G-007ALTFEXP_G-007A->PJM
CMTX
42.674
VTFLTFEXP_VFT->PJM
CMTX
112.763
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
5.028
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
2.891
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
16.639
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
3.476
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
10.841
MDUPJM->LTFIMP_MDU
CLTF
0

Details for PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P1-2_PE-500-3835T_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-3835T_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:136.68 %
Rating:3620.0 MVA
Rating Type:B
MVA to Mitigate:4947.73
MW Contribution:
0.64
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
200052ROCKSP 1
50/50
4.042
200053ROCKSP 2
50/50
3.962
200054ROCKSP 3
50/50
4.089
200055ROCKSP 4
50/50
4.018
200203Y1-065-STG
50/50
11.126
200204Y1-065-CTG1
50/50
6.424
200205Y1-065-CTG2
50/50
6.424
3147043LAWRENC
Solar/Wind Helper
0.167
3147133PAMPLIN
Solar/Wind Helper
0.871
3147133PAMPLIN
Solar/Wind Helper
0.222
3147133PAMPLIN
Solar/Wind Helper
0.277
20328326MANOR_T86
Adder
0.124
20334726NME_Y1-047
Adder
2.53
20390726Y2-042
Adder
2.94
23546401DTGZ2-030
Solar/Wind Helper
0.09
23750701CROSSCHOOL
Solar/Wind Helper
1.106
20486527WR_V4-052
Adder
1.044
20628028LAKEHURS
Adder
1.308
20633028GILCT9
Adder
35.557
20635828PARLN1&2
Adder
4.503
20635828PARLN1&2
Adder
9.943
20635928PARLN3&4
Adder
4.503
20635928PARLN3&4
Adder
9.943
20636028O CRK C1
Adder
9.781
20636128O CRK C2
Adder
8.918
20714828MDF_W3-079
Solar/Wind Harmer
0.134
213497CHSTR7-9
Adder
3.881
213497CHSTR7-9
Adder
3.881
213497CHSTR7-9
Adder
3.881
213535CROYDN11
Adder
14.321
213560DLW11-12
Adder
3.815
213560DLW11-12
Adder
3.815
213561DLWR9-10
Adder
4.989
213561DLWR9-10
Adder
3.815
213587EDDYSTN3
Adder
113.209
213589EDDYSTN4
Adder
113.222
213611FALLS1-3
Adder
4.905
213611FALLS1-3
Adder
4.905
213611FALLS1-3
Adder
4.905
213815MOSER1-3
Adder
4.948
213815MOSER1-3
Adder
4.948
213815MOSER1-3
Adder
4.948
213942SCHUYLKILL
Adder
3.833
213942SCHUYLKILL
Adder
5.013
213957STHWK3-4
Adder
3.833
213957STHWK3-4
Adder
3.833
213958STHWK5-6
Adder
3.833
213958STHWK5-6
Adder
3.833
214194N WALES4
Adder
1.176
231907DC10
Adder
5.977
231917EM10
Adder
3.862
231918WEST 1
Adder
5.542
231919CHRIST1
Adder
7.29
231920CHRIST2
Adder
7.128
231940T-011
Adder
1.295
232404W1-003 C
Solar/Wind Harmer
1.121
232408W1-005 C
Solar/Wind Harmer
1.121
232410W1-006 C
Solar/Wind Harmer
1.121
232813VAUGHN
Adder
1.017
232901NORTHST
Adder
14.489
232902EASTMUNI
Adder
22.492
232904IR4
Adder
140.471
232907VN8
Adder
52.124
232912OH NUG1
Adder
15.338
232913OH NUG2
Adder
15.134
232914OH NUG3
Adder
15.338
232915OH NUG4
Adder
15.236
232916OH NUG5
Adder
15.338
232917OH NUG6
Adder
15.27
232918OH NUG7
Adder
15.236
232919VN10
Adder
4.869
232920IR10
Adder
5.49
232921TASLEY2G
Adder
8.964
232926CRISFLD1
Adder
3.408
23777801MSM_W1-116
Solar/Wind Helper
0.107
23777901MDS_W4-102
Solar/Wind Helper
0.174
3137176SLIGO L2192
Solar/Wind Helper
1.148
3141426STAFORD
Solar/Wind Helper
0.07
3141906WESTMOR
Solar/Wind Helper
0.121
3142416OLDCHRC
Solar/Wind Helper
0.77
3142416OLDCHRC
Solar/Wind Helper
0.295
3142433PROV 92
Solar/Wind Helper
1.18
3142956BIRDNECK
Solar/Wind Helper
0.195
3143316POE
Solar/Wind Helper
1.149
3144356SAPONY
Solar/Wind Helper
0.513
3145506HICKORY
Solar/Wind Helper
1.156
3145506HICKORY
Solar/Wind Helper
0.694
3145506HICKORY
Solar/Wind Helper
0.173
3146386ELIZ CT
Solar/Wind Helper
0.288
3146776BUCKING
Solar/Wind Helper
1.122
3146776BUCKING
Solar/Wind Helper
0.091
3146776BUCKING
Solar/Wind Helper
0.101
3146776BUCKING
Solar/Wind Helper
0.112
209027LOR2_Q27
Solar/Wind Harmer
0
217083KRNY_132
Adder
12.162
217083KRNY_132
Adder
12.24
217086KRNY_131
Adder
12.266
217086KRNY_131
Adder
12.136
217146KRNY_1234
Adder
11.409
217146KRNY_1234
Adder
11.331
217147KRNY_1212
Adder
11.643
217147KRNY_1212
Adder
11.435
217167KRNY_14
Adder
12.24
217186ESSEX_G9
Adder
5.198
218418LINDEN_G5
Adder
22.846
218419LINDEN_G6
Adder
22.846
219035LINDEN_G8
Adder
21.855
219036LINDEN_G7
Adder
22.171
228200CARL#1CT
Adder
9.62
228201CARL#2CT
Adder
10.115
228206SHRMN CT
Adder
24.486
228251CARLLS#4
Adder
0.928
228307PCLP GT
Adder
17.625
228400MICK 1CT
Adder
17.114
235020AA1-095 C
Solar/Wind Helper
0.052
316075AC2-137 C
Solar/Wind Helper
0.451
316077AC2-138 C
Solar/Wind Helper
0.282
20462827N BANGR8
Adder
0.904
228732V1-021 C
Adder
0.279
3138133OCRAN
Solar/Wind Helper
0.089
3138133OCRAN
Solar/Wind Helper
0.178
3141766HARMONY
Solar/Wind Helper
0.059
3141783LANCAST
Solar/Wind Helper
0.178
3141783LANCAST
Solar/Wind Helper
0.118
3141813NORNECK
Solar/Wind Helper
0.299
3141913WHIT STONE
Solar/Wind Helper
0.296
3143226MDLTHAN
Solar/Wind Helper
0.294
3143873LANEXA
Solar/Wind Helper
0.177
3145273HOLLAND
Solar/Wind Helper
0.215
3146376EDENTON
Solar/Wind Helper
0.285
3146456SLIGO L269
Solar/Wind Helper
0.289
3146456SLIGO L269
Solar/Wind Helper
0.289
3146486SUNBURY
Solar/Wind Helper
0.288
3146486SUNBURY
Solar/Wind Helper
0.288
3146516WINFALL
Solar/Wind Helper
0.287
3146516WINFALL
Solar/Wind Helper
0.287
3146516WINFALL
Solar/Wind Helper
0.929
3146516WINFALL
Solar/Wind Helper
0.287
3146516WINFALL
Solar/Wind Helper
0.287
3146516WINFALL
Solar/Wind Helper
0.287
3146626S HERTFORD
Solar/Wind Helper
0.286
3146626S HERTFORD
Solar/Wind Helper
0.286
3146626S HERTFORD
Solar/Wind Helper
0.286
3146843MT LREL
Solar/Wind Helper
0.271
3146843MT LREL
Solar/Wind Helper
0.271
3146926FARMVIL
Solar/Wind Helper
0.168
3146926FARMVIL
Solar/Wind Helper
0.168
3147123OTTER R
Solar/Wind Helper
0.15
3147312GRETNA
Solar/Wind Helper
0.05
3147312GRETNA
Solar/Wind Helper
0.199
3147666LOUISA
Solar/Wind Helper
1.209
3147666LOUISA
Solar/Wind Helper
0.695
3147983MERCK5
Solar/Wind Helper
0.11
200034PCHBTM 2
50/50
32.749
200035PCHBTM 3
50/50
32.254
232406W1-004 FULL
Solar/Wind Harmer
1.121
200192DELTA CT1
50/50
3.14
200193DELTA CT2
50/50
3.14
200194DELTA CT3
50/50
3.14
200195DELTA ST
50/50
4.851
3141726DUNNSVL
Solar/Wind Helper
1.194
3145663CRESWEL
Solar/Wind Helper
0.792
316034AC1-036 C
Solar/Wind Helper
0.29
316036AC1-147 C
Solar/Wind Helper
0.442
316059AD1-063 C
Solar/Wind Helper
0.299
316159AE1-175 C
Solar/Wind Helper
0.446
316240AF1-291 C
Solar/Wind Helper
0.394
316246AF1-032 C
Solar/Wind Helper
0.33
316248AF1-058 C
Solar/Wind Helper
0.362
316258AE1-075 C
Solar/Wind Helper
0.398
316305AF2-043 C
Solar/Wind Helper
0.389
316315AB2-025 C
Solar/Wind Helper
0.437
316316AC1-027 C
Solar/Wind Helper
0.458
316317KELFORD C
Solar/Wind Helper
0.25
316382AG1-145 C
Solar/Wind Helper
0.395
316405AF2-144 C
Solar/Wind Helper
0.331
223402AF1-300 C
Solar/Wind Helper
0.532
208909MACR G3
Adder
200.022
209008PAXT IPP
Adder
1.515
209010PEIP 1
Adder
4.134
209010PEIP 1
Adder
0.606
209010PEIP 1
Adder
0.752
209018SUNBIPCT
Adder
8.01
209023WIENIPP1
Adder
12.736
209025WIENIPP3
Adder
6.229
209025WIENIPP3
Adder
6.357
209026WIENIPP4
Adder
6.293
232899W1-062
Adder
16.71
232900DEMECSMY
Adder
16.028
232905CHERITON_25
Adder
4.261
218524CNTRALGAS1 C
Solar/Wind Harmer
1.021
218526CNTRALGAS2 C
Solar/Wind Harmer
1.024
226910AB2-157 C
Solar/Wind Helper
0.021
233939AC1-091 C
Solar/Wind Harmer
3.14
233970AC1-092 C
Solar/Wind Harmer
3.14
233971AC1-093 C
Solar/Wind Harmer
3.14
233972AC1-094 C
Solar/Wind Harmer
3.14
233973AC2-185 C
Solar/Wind Harmer
3.14
212507AE2-042_GEN
Solar/Wind Harmer
0.669
237025AB1-124 C
Solar/Wind Helper
0.144
237030AB1-096 C
Solar/Wind Helper
0.059
237038AE2-054 C
Solar/Wind Helper
0.244
3130156CHOWAN
Solar/Wind Helper
0.285
3130156CHOWAN
Solar/Wind Helper
0.285
3130156CHOWAN
Solar/Wind Helper
0.285
3145336SMITFLD
Solar/Wind Helper
1.162
3145336SMITFLD
Solar/Wind Helper
0.116
3148133STUARTS
Solar/Wind Helper
0.164
3146802CHATHAM
Solar/Wind Helper
0.187
3141196NOKESVL
Solar/Wind Helper
1.271
3147243WELCO
Solar/Wind Helper
0.168
3141873WAN 176
Solar/Wind Helper
0.059
3143526WINTERP
Solar/Wind Helper
1.532
3143526WINTERP
Solar/Wind Helper
1.532
316411AF1-147_GEN1
Solar/Wind Helper
1.087
316415AF1-147_GEN2
Solar/Wind Helper
1.087
316404AE1-155 C
Solar/Wind Helper
2.549
316017AA1-139 ULT1
Solar/Wind Helper
1.323
316018AA1-139 ULT2
Solar/Wind Helper
1.245
316181AB2-040 GEN
Solar/Wind Helper
2.003
316033AB2-134 GEN
Solar/Wind Helper
1.012
316388AE2-253 GEN
Solar/Wind Helper
1.103
235062AE1-101 C1
Solar/Wind Helper
1.427
203926AA2-133 GEN
Adder
2.288
3148013FISHERV
Solar/Wind Helper
0.157
3148013FISHERV
Solar/Wind Helper
0.274
3145176PASQUOTANK
Solar/Wind Helper
0.178
3132123MT JACKSON
Solar/Wind Helper
0.865
3132273ORANGE
Solar/Wind Helper
0.061
3142543TWELFTH
Solar/Wind Helper
0.028
3144303KENBRDG
Solar/Wind Helper
0.221
3147173SINAI
Solar/Wind Helper
0.268
3148463FAIRFLD
Solar/Wind Helper
0.266
238185AF2-356 C
Solar/Wind Helper
1.926
237080AD1-060 GEN
Solar/Wind Helper
0.314
235067AD1-061 GEN
Solar/Wind Helper
0.397
237001AB1-127_GEN
Solar/Wind Helper
0.387
237002AB1-128_GEN
Solar/Wind Helper
0.39
238175AF1-290_GEN
Solar/Wind Helper
0.16
238221AF1-254 C O1
Solar/Wind Helper
0.259
238120AE2-309 GEN
Solar/Wind Helper
0.408
238169AE2-226 GEN1
Solar/Wind Helper
0.719
238170AE2-226 GEN2
Solar/Wind Helper
0.719
238108AE1-109 GEN1
Solar/Wind Helper
0.095
238109AE1-109 GEN2
Solar/Wind Helper
0.095
238110AE1-109 GEN3
Solar/Wind Helper
0.095
237085AD2-009_GEN
Solar/Wind Helper
1.441
316494AC1-189 GEN
Solar/Wind Helper
1.666
315616AA1-038_C
Solar/Wind Helper
1.206
316420AA1-050 GEN
Solar/Wind Helper
1.565
316005AA1-067
Solar/Wind Helper
0.314
316426AA2-053 GEN
Solar/Wind Helper
1.59
316190AA2-174 GEN
Solar/Wind Helper
0.019
316327AA2-057 GEN
Solar/Wind Helper
1.561
315614AA2-178 GEN
Solar/Wind Helper
1.729
315816AE2-034 GEN
Solar/Wind Helper
1.297
316312AB1-027
Solar/Wind Helper
0.566
316049AB1-081 GEN
Solar/Wind Helper
1.653
316011AB1-132 GEN
Solar/Wind Helper
2.997
316369SG1_INVT
Solar/Wind Helper
1.409
235054AD2-180 GEN
Solar/Wind Helper
1.519
315651AD1-115 GEN
Solar/Wind Helper
1.039
316023GEN1_S
Solar/Wind Helper
1.072
316365GEN2_N
Solar/Wind Helper
1.072
237061AD1-155 GEN
Solar/Wind Helper
1.789
235531U2-073 GEN
Solar/Wind Helper
2.561
237006AB1-125 GEN
Solar/Wind Helper
0.108
23779801AA1-109
Solar/Wind Helper
0.184
316463AE2-346 GEN
Solar/Wind Helper
0.256
315839AE2-212 C
Solar/Wind Helper
0.393
233984AB2-036 GEN
Solar/Wind Harmer
12.49
233915AB1-141 GEN
Solar/Wind Harmer
0.434
233918AB1-142 GEN
Solar/Wind Harmer
0.434
315821AE2-092 GEN
Solar/Wind Helper
2.577
316499AE2-029_GEN
Solar/Wind Helper
0.922
315671AE2-027_GEN
Solar/Wind Helper
2.363
23583801GRNGAP
Solar/Wind Helper
4.529
233930AB2-032 GEN
Solar/Wind Harmer
1.631
233987AB2-037 GEN
Solar/Wind Harmer
-0.002
315662AE1-191 GEN
Solar/Wind Helper
1.593
315666AE1-190 GEN
Solar/Wind Helper
0.398
319010AE1-072 C
Solar/Wind Helper
3.303
315697AD1-025 GEN
Solar/Wind Helper
3.342
316185AD1-033 GEN
Solar/Wind Helper
1.364
315773AC2-141 GEN
Solar/Wind Helper
6.258
316280AD1-041 GEN
Solar/Wind Helper
0.995
233935AB2-179 C
Solar/Wind Harmer
2.284
234041AC1-190 GEN
Solar/Wind Harmer
12.629
316003AC1-222 GEN
Solar/Wind Helper
1.159
315732AD1-074 GEN1
Solar/Wind Helper
3.224
315733AD1-074 GEN2
Solar/Wind Helper
3.224
315735AD1-075 GEN1
Solar/Wind Helper
1.612
315737AD1-076 GEN
Solar/Wind Helper
2.757
316473AC1-191 GEN
Solar/Wind Helper
1.819
316478AD1-087 GEN
Solar/Wind Helper
1.358
316486AD2-202 GEN
Solar/Wind Helper
0.398
316447AC1-158 HLD
Solar/Wind Helper
3.788
316044AC1-158 PL1
Solar/Wind Helper
1.721
316045AC1-158 PL2
Solar/Wind Helper
5.508
316450AC1-158 RIC
Solar/Wind Helper
0.459
316468AD1-105 GEN
Solar/Wind Helper
1.451
316072AD1-144
Solar/Wind Helper
0.331
315687AD1-152 GEN
Solar/Wind Helper
1.474
316156AD2-030 GEN
Solar/Wind Helper
0.447
315785AD2-033 C
Solar/Wind Helper
3.221
316337AD2-073 GEN
Solar/Wind Helper
0.457
233968AD2-076_GEN
Solar/Wind Harmer
3.978
234012AE2-112_GEN
Solar/Wind Harmer
3.978
234014AF1-036_GEN
Solar/Wind Harmer
3.978
207522AF2-254 C
Solar/Wind Harmer
1.285
207528AF2-192 GEN
Solar/Wind Harmer
0.95
207442AE1-156 GEN
Solar/Wind Harmer
0.078
226929AD2-058 GEN
Solar/Wind Helper
0.145
207437AD2-070 GEN
Solar/Wind Harmer
0.082
313526AB2-022
Solar/Wind Helper
0.439
316313AB2-026
Solar/Wind Helper
0.442
209120AE2-241 GEN
Solar/Wind Harmer
1.801
209093AE2-110 GEN
Solar/Wind Harmer
1.801
3145513AHOSKIE
Solar/Wind Helper
0.28
3145513AHOSKIE
Solar/Wind Helper
0.125
230430AE1-229_GEN
Solar/Wind Harmer
29.099
219304NAMERICA C
Solar/Wind Harmer
0.127
238127S14_GEN_2
Solar/Wind Helper
0.637
238126S14_GEN_1
Solar/Wind Helper
0.637
231902DC CT7
Adder
19.141
231906DC3 NUG
Adder
23.943
238117U2-030
Solar/Wind Helper
0.261
238118U2-030_1
Solar/Wind Helper
0.261
208862AG1-362 C
Solar/Wind Harmer
0.524
270197AD1-017 GEN1
Solar/Wind Helper
1.335
270173AC1-122 GEN
Solar/Wind Helper
1.673
209130AF1-271A GEN
Solar/Wind Harmer
2.109
209142AF1-226 GEN
Solar/Wind Harmer
3.152
205941AD2-115 GEN
Solar/Wind Harmer
0.12
270214AC2-123 GEN
Solar/Wind Helper
0.81
20465427SHAW CT
Adder
4.866
270455AD2-022 GEN
Solar/Wind Helper
1.489
270457AD2-023 GEN
Solar/Wind Helper
0.981
270336AE1-100 GEN
Solar/Wind Helper
1.038
270494AE1-108_GEN
Solar/Wind Helper
3.637
270016AE1-250 BESS
Solar/Wind Helper
0.923
270013AE1-250 PV
Solar/Wind Helper
0.923
270018AE2-047 C O1
Solar/Wind Helper
0.867
3145746EVERETS
Solar/Wind Helper
0.274
3145746EVERETS
Solar/Wind Helper
0.274
3145746EVERETS
Solar/Wind Helper
0.274
3145746EVERETS
Solar/Wind Helper
0.274
3145746EVERETS
Solar/Wind Helper
1.089
3145746EVERETS
Solar/Wind Helper
0.274
3145746EVERETS
Solar/Wind Helper
0.274
3145746EVERETS
Solar/Wind Helper
0.274
3146206CASHIE
Solar/Wind Helper
0.281
3146206CASHIE
Solar/Wind Helper
0.281
3146206CASHIE
Solar/Wind Helper
0.281
3142666NORTHAMPTON
Solar/Wind Helper
0.278
3142666NORTHAMPTON
Solar/Wind Helper
0.278
3142666NORTHAMPTON
Solar/Wind Helper
0.278
3142666NORTHAMPTON
Solar/Wind Helper
0.167
3142666NORTHAMPTON
Solar/Wind Helper
0.278
316274AC1-208 GEN
Solar/Wind Helper
1.68
316349AD2-085 GEN
Solar/Wind Helper
1.323
3156021HOLLOMANSOL
Solar/Wind Helper
2.134
313506AB2-031 GEN
Solar/Wind Helper
1.268
316006AB2-029 C
Solar/Wind Helper
0.149
316322AB2-045
Solar/Wind Helper
0.314
316359AB2-059 GEN
Solar/Wind Helper
2.067
316131AB2-060 GEN
Solar/Wind Helper
1.679
316192AB2-158 GEN
Solar/Wind Helper
2.035
316174AB2-169 GEN
Solar/Wind Helper
0.71
316087AB2-174 GEN
Solar/Wind Helper
1.954
316132AB2-190 GEN1
Solar/Wind Helper
1.674
316458AB2-190 GEN2
Solar/Wind Helper
1.674
316129AC1-054 GEN
Solar/Wind Helper
1.366
316123AC1-075 GEN
Solar/Wind Helper
1.587
316210AC1-098 GEN
Solar/Wind Helper
2.227
316212AC1-099_GEN
Solar/Wind Helper
1.237
316118AC1-105 GEN
Solar/Wind Helper
1.05
316222AC1-221 GEN
Solar/Wind Helper
1.501
316375AC2-012 GEN
Solar/Wind Helper
0.763
316283AC2-100 C
Solar/Wind Helper
1.398
316339AD2-160 GEN
Solar/Wind Helper
1.103
316164AC1-076 GEN
Solar/Wind Helper
1.471
20635028RRCT1&2
Adder
15.8
20635028RRCT1&2
Adder
15.557
20635128RRCT3&4
Adder
15.017
20635128RRCT3&4
Adder
13.099
316239AB2-077_GEN
Solar/Wind Helper
0.37
316238AB2-078_GEN
Solar/Wind Helper
0.37
316237AB2-079_GEN
Solar/Wind Helper
0.37
316140AB2-099
Solar/Wind Helper
0.107
316197AC1-042 GEN
Solar/Wind Helper
0.235
316223AC1-118
Solar/Wind Helper
0.461
316294AC1-161 GEN
Solar/Wind Helper
5.319
315975AC1-164 GENB
Solar/Wind Helper
0.113
315976AC1-164 GENA
Solar/Wind Helper
3.808
316169AC1-164_GENC
Solar/Wind Helper
3.29
316381AD1-082 GEN
Solar/Wind Helper
1.505
316233AE1-074 FULL
Solar/Wind Helper
0.45
316236AE1-162_GEN
Solar/Wind Helper
0.391
315607AA1-063A GEN
Solar/Wind Helper
1.597
20465527S.RDG CT
Adder
2.578
20465527S.RDG CT
Adder
2.665
20466127PORT 5CT
Adder
33.551
20465127PORT CT
Adder
3.798
20465127PORT CT
Adder
5.04
3130546PLYMOUTH
Solar/Wind Helper
0.282
3145543BTLEBRO
Solar/Wind Helper
0.217
3145543BTLEBRO
Solar/Wind Helper
0.271
3145543BTLEBRO
Solar/Wind Helper
0.271
3145543BTLEBRO
Solar/Wind Helper
0.271
3145593CAROLNA
Solar/Wind Helper
0.278
3145593CAROLNA
Solar/Wind Helper
0.278
3145683EARLEYS
Solar/Wind Helper
0.279
3145683EARLEYS
Solar/Wind Helper
0.279
3145683EARLEYS
Solar/Wind Helper
0.279
3145683EARLEYS
Solar/Wind Helper
0.558
200200DELTA2 CT1
50/50
5.619
200201DELTA2 CT2
50/50
5.619
200202DELTA2 ST
50/50
9.516
223401AF1-299 GEN
Solar/Wind Helper
0.532
232432Z2-076 GEN
Solar/Wind Harmer
0.023
232434Z2-077 GEN
Solar/Wind Harmer
0.072
3130086AYDLETT
Solar/Wind Helper
1.154
3137643SOCKMAN
Solar/Wind Helper
1.111
3138216PACIFIC
Solar/Wind Helper
0.054
3138266HYDRAULIC
Solar/Wind Helper
0.008
3138266HYDRAULIC
Solar/Wind Helper
0.013
3138543CONSLDL
Solar/Wind Helper
0.179
3142946ENON
Solar/Wind Helper
0.03
3142946ENON
Solar/Wind Helper
0.098
3144536CHRHLND
Solar/Wind Helper
0.044
3144873MCLAUGH
Solar/Wind Helper
0.007
3145573BETHELC
Solar/Wind Helper
0.272
3145573BETHELC
Solar/Wind Helper
0.272
3145783HORNRTN
Solar/Wind Helper
0.277
3145796HORNRTN
Solar/Wind Helper
0.831
3145796HORNRTN
Solar/Wind Helper
0.914
3145796HORNRTN
Solar/Wind Helper
0.277
3145796HORNRTN
Solar/Wind Helper
0.277
3145796HORNRTN
Solar/Wind Helper
1.107
3145796HORNRTN
Solar/Wind Helper
0.886
3145796HORNRTN
Solar/Wind Helper
0.111
3145823KELFORD
Solar/Wind Helper
0.278
3145823KELFORD
Solar/Wind Helper
0.278
3145893MURPHYS
Solar/Wind Helper
0.403
3145893MURPHYS
Solar/Wind Helper
0.505
3145893MURPHYS
Solar/Wind Helper
0.101
3145893MURPHYS
Solar/Wind Helper
0.281
3145893MURPHYS
Solar/Wind Helper
1.123
3145893MURPHYS
Solar/Wind Helper
0.281
3145893MURPHYS
Solar/Wind Helper
0.758
3145933PARMELE
Solar/Wind Helper
0.55
3145933PARMELE
Solar/Wind Helper
0.275
3145933PARMELE
Solar/Wind Helper
0.275
3145963POPLR C
Solar/Wind Helper
0.278
3145963POPLR C
Solar/Wind Helper
0.278
3146033SCOT NK
Solar/Wind Helper
1.106
3146043SEABORD
Solar/Wind Helper
0.279
3146073TAR RVR
Solar/Wind Helper
0.272
3146083TARBORO
Solar/Wind Helper
0.272
3146083TARBORO
Solar/Wind Helper
0.272
3146173TUNIS
Solar/Wind Helper
0.28
3146173TUNIS
Solar/Wind Helper
0.28
3146173TUNIS
Solar/Wind Helper
0.28
3146173TUNIS
Solar/Wind Helper
0.28
3146233WITAKRS
Solar/Wind Helper
0.292
3146233WITAKRS
Solar/Wind Helper
1.082
3146233WITAKRS
Solar/Wind Helper
0.185
3146263WOODLND
Solar/Wind Helper
0.279
3146263WOODLND
Solar/Wind Helper
0.279
315611Z1-036_GEN2
Solar/Wind Helper
1.569
315800Z1-036_GEN1
Solar/Wind Helper
1.569
316095T157 G97
Solar/Wind Helper
1.23
316097T157 G90
Solar/Wind Helper
1.23
316320Y1-086
Solar/Wind Helper
0.129
316321Z2-027
Solar/Wind Helper
0.439
942461AE2-259 GEN
Solar/Wind Helper
1.877
943811AF1-049 GEN
Solar/Wind Helper
1.491
946281AF1-292 GEN
Solar/Wind Helper
0.281
961541AF2-445A GEN
Solar/Wind Harmer
2.571
961671AG1-007 GEN
Solar/Wind Helper
0.195
961941AG1-037 GEN
Solar/Wind Helper
0.094
963071AG1-156 GEN
Solar/Wind Harmer
8.9
963391AG1-188 GEN
Solar/Wind Harmer
2.527
963401AG1-189 GEN
Solar/Wind Harmer
1.552
966871AG1-558 GEN
Solar/Wind Helper
0.401
966881AG1-559 GEN
Solar/Wind Helper
0.411
970025AG2-016 GEN
Solar/Wind Harmer
2.528
970095AG2-074 GEN
Solar/Wind Harmer
5.903
970453AG2-297 GEN
Solar/Wind Harmer
3.773
970597AG2-380 GEN
Solar/Wind Harmer
7.124
970695AG2-447 GEN
Solar/Wind Harmer
4.351
970757AG2-479 GEN
Solar/Wind Harmer
0.848
970761AG2-481 GEN
Solar/Wind Harmer
0.858
970997AG2-616 GEN
Solar/Wind Harmer
10.584
971007AG2-625 GEN
Solar/Wind Harmer
2.113
971009AG2-626 GEN
Solar/Wind Harmer
1.347
971189AH1-054 GEN
Solar/Wind Harmer
1.052
971195AH1-057 GEN
Solar/Wind Harmer
1.085
971519AH1-257 GEN
Solar/Wind Harmer
2.071
971521AH1-258 GEN
Solar/Wind Harmer
2.369
971667AH1-334 GEN
Solar/Wind Harmer
2.444
219221BRL12CT1
Adder
12.509
219222BRL12CT2
Adder
12.509
219223BRL12CT3
Adder
12.509
219224BRL12CT4
Adder
12.509
227287AC2-120 GEN
Solar/Wind Helper
0.514
316431W1029_GEN1
Solar/Wind Helper
1.16
316433W1029_GEN2
Solar/Wind Helper
1.16
316435W1029_GEN3
Solar/Wind Helper
1.16
957601AF2-054 GEN
Solar/Wind Helper
0.396
957831AF2-077 GEN
Solar/Wind Helper
0.396
964001AG1-254 GEN
Solar/Wind Harmer
8.266
964211AG1-282 GEN
Solar/Wind Helper
0.402
964991AG1-363 GEN
Solar/Wind Helper
3.56
966001AG1-469 GEN
Solar/Wind Helper
0.321
966261AG1-495 GEN
Solar/Wind Harmer
2.216
966621AG1-532 GEN
Solar/Wind Helper
0.254
972141AH1-641 GEN
Solar/Wind Harmer
2.29
972177AH1-672 GEN
Solar/Wind Harmer
17.69
972221AH1-695 GEN
Adder
101.413
972233AH1-701 GEN
Adder
6.086
972237AH1-703 GEN
Adder
13.326
972251AH1-710 GEN
Adder
76.361
972275AH1-722 GEN
Adder
41.999
958121AF2-106 GEN
Solar/Wind Helper
1.717
200917MEHOOPANY_G
Solar/Wind Harmer
0.376
970767AG2-484 GEN
Solar/Wind Harmer
0.635
941421AE2-139 GEN
Solar/Wind Harmer
0
972260AH1-715 GEN1
Adder
18.294
972261AH1-715 GEN2
Adder
21.223
238147AE2-230_GEN1
Solar/Wind Helper
0.496
238148AE2-230_GEN2
Solar/Wind Helper
0.496
238149AF1-291A_GEN
Solar/Wind Helper
0.142
238152AF2-075_GEN
Solar/Wind Helper
0.709
230422AE1-104_GEN1
Solar/Wind Harmer
19.857
230425AE1-104_GEN2
Solar/Wind Harmer
19.857
232422X3-066 FULL
Solar/Wind Harmer
0.142
234033AF1-007_GEN
Solar/Wind Harmer
23.992
316487AF1-042 GEN
Solar/Wind Helper
0.3
316484AD2-074 GEN
Solar/Wind Helper
0.574
235063AE1-101 C2
Solar/Wind Helper
1.427
207500AE2-000G1
Solar/Wind Harmer
17.499
207497AE2-000G2
Solar/Wind Harmer
17.499
207507AE2-000G3
Solar/Wind Harmer
17.499
207487AE2-000G4
Solar/Wind Harmer
17.499
217121ECCF
Adder
0.572
232910NRG_G1
Adder
14.889
CBM NorthLTFEXP_CBM-N->PJM
CBM
95.196
G-007ALTFEXP_G-007A->PJM
CMTX
68.711
VTFLTFEXP_VFT->PJM
CMTX
178.78
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
6.521
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
3.831
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
24.651
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
5.228
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
16.29
MDUPJM->LTFIMP_MDU
CLTF
0
CONTINGENCY 'AP_P1-2_PE-500-3835T_SRT-A'
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
END
200004 to 200003 ckt 1
200064 to 200004 ckt 1

Winter Peak Analysis

The New Service Request AG2-484 was evaluated as a 0.0 MW (4.6 MW Capacity) injection in the PPL area.

AG2-484 was evaluated as part of a plant. The plant consists of AG2-484. The total Energy output of the plant was evaluated at its maximum seasonal capability of 20.0 MW (0.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Light Load Analysis

The New Service Request AG2-484 was evaluated as a 0.0 MW injection

AG2-484 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 20.0 MW (0.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Short Circuit Analysis

Analysis Complete - No Issues

Based on PJM’s TC2 Phase II Short Circuit Analysis, this project did not contribute >1% fault duty to any previously identified overdutied breakers, nor did it cause any new overdutied breakers.

Please note that in TC2 Phase III, PJM will perform additional analysis including the evaluation of impacts from topology upgrades which may have potential effects on breaker duties not seen in the Phase II analysis.

Stability Analysis

Analysis Complete - No Issues

Executive Summary:

New Service Requests (projects) in PJM Transition Cycle 2 (TC2) Cluster 81 are listed in Table 1 below. This report will cover the dynamic analysis of TC2 Cluster 81 projects.

Table 1: Transition Cycle 2 Cluster 81 Projects

Cluster

Project

Fuel Type

Transmission Owner

MFO

MWE

MWC

Point of Interconnection

81

AG2-074

Solar

PPL

38

38

26.2

Meckesville Tap 69 kV

81

AG2-479

Solar

PPL

20

0

4.1

Penns Tap-Richfield Tie 69 kV

81

AG2-481

Solar

PPL

20

0

4.1

Derry Tap-Derry 69 kV

81

AG2-484

Solar

PPL

20

0

4.1

Mifflintown Bus-Mifflintown Tap 69 kV

 

The purpose of the transient stability analysis is to determine the system impact of the generation facility. This study will determine system improvements, if any, needed to reduce violations in the transient stability analysis caused by the addition of the projects in TC2 Cluster 81.

 

The load flow scenario for the analysis was based on the Regional Transmission Expansion Plan (RTEP) 2028 summer peak and light load cases, modified to include applicable projects. TC2 Cluster 81 projects have been dispatched online at maximum power output with near unity power factor measured at the high-side of the main substation transformer.

 

TC2 Cluster 81 projects were tested for compliance with NERC, PJM, PPL and other applicable criteria. 199 contingencies were studied, each with a 20 second simulation time period. The contingencies studied included:

  • Steady-state operation (20 seconds)
  • Three-phase faults with normal clearing time
  • Single-phase bus faults with normal clearing time
  • Single-phase faults with stuck breaker
  • Single-phase Faults with loss of multiple-circuit tower line

 

For all simulations, the projects under study along with the rest of the PJM system were required to maintain synchronism and with all states returning to an acceptable new condition following the disturbance.

 

The results of the analysis were evaluated against the following recovery criteria per PJM’s Regional Transmission Planning Process and PPL’s transmission planning criteria:

  • All generators were able to ride through the faults (except for faults where protective action trips a generator(s)),
  • The system with TC2 Cluster 81 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3%.
  • Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus) and the final voltages are within the steady-state voltage ranges below per PPL’s transmission planning criteria.
      • P1, P2, P4, P7 Category Contingencies:
        • 0.893 to 1.019 p.u. for 69 kV facilities
        • 0.92 to 1.05 p.u. for 230, 115 facilities
        • 0.97 to 1.1 p.u. for 500 kV facilities
    • No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

 

AG2-074 met the 0.95 leading and lagging power factor requirement at the high side of the main transformer.

 

AG2-479 met the 0.95 leading and lagging power factor requirement at the high side of the main transformer.

 

AG2-481 met the 0.95 leading and lagging power factor requirement at the high side of the main transformer.

 

AG2-484 met the 0.95 leading and lagging power factor requirement at the high side of the main transformer.

 

The CSCR assessment indicates a weak grid concern for the AG2-074 and AG2-484 projects. An EMT analysis is recommended.

 

No mitigation is required to connect projects in TC2 Cluster 81.

 

Under light load (LL) conditions, instability was observed for a P1 fault on the Sunbury–Juniata 500 kV line. This outage was examined in the power flow case and the solution diverged.  A sensitivity analysis was performed to examine the impacts of a reduced generation dispatch.  With the reduced generation dispatch the system remained stable. The TC2 Cluster 81 queue projects were turned off for both dispatches and the results remained the same.

 

The results for the light load case indicate instability can occur dependent on the dispatch conditions. However, this instability was not caused by the addition of the TC2 Cluster 81 queue projects. If stability limitations within PPL are expected under light load conditions additional dispatching instructions from the TO for case conditioning can be included in the Phase 3 analysis.  Additionally, the summer peak case conditioning should be discussed with the TO the oscillations observed are not expected.

 

Instability was observed under light load conditions for multiple P4 contingencies at the Sunbury 69 kV bus attributed to the SUNBIPCT generator model. Sensitivity analysis was conducted by updating the SUNBIPCT load flow and dynamic models to reflect the AF2 base case configuration. With the updated SUNBIPCT representation, the system remained stable. The SUNBIPCT CT unit is modelled as a 36 MW generator; however, an additional 5 MW diesel unit may have been included in the TC2 base case, potentially contributing to differences in system response. It’s recommended the SUNBIPCT generator model be reviewed further to determine the correct modelling.

 

The following model tuning is recommended. The generator owner should provide their preferred adjustments for the issues described in the summary of results:

 

  • AG2-074
    • Increase relay pick-up time from 0.16 to 0.714 seconds for the protection model tripping for frequencies below 55 Hz to avoid generator tripping.
  • AF1-040
    • Increase relay pick-up time from 0.16 to 0.3 seconds for the protection model tripping for frequencies above 62.4 Hz to avoid generator tripping.
  • AG2-484
    • Increase relay pick-up time from 0.16 to 0.2126 seconds for the protection model tripping for frequencies above 64 Hz to avoid generator tripping.
  • AF2-361
    • It is recommended that the SMA SC 2800UP-US inverters for AF2-361 have its dynamic model REECAU1 Vup (CON J+1) be updated from 1.20 to 1.22 p.u. to avoid controller freezing.
    • Increase relay pick-up time from 0.16 to 0.2584 seconds for the protection model tripping for voltages above 1.2 p.u to avoid generator tripping.
    • Increase relay pick-up time from 0.16 to 0.2334 seconds for the protection model tripping for frequencies below 62 Hz to avoid generator tripping.
  • AF2-233
    • Increase relay pick-up time from 0.017 to 0.0209 seconds for the protection model tripping for voltages above 1.3 p.u to avoid generator tripping.

 

Reactive Power Analysis

Analysis Complete - No Issues

The reactive power capability of AG2-484 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Not Required

A steady state voltage analysis is evaluated on a project-by-project basis and depends on specific project parameters. For this project, a steady state voltage analysis is not required per PJM's Manual 14H, Section 4.5.2.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

(No dependencies were identified)

Affected System - PJM Identified Violations

As part of PJM's analysis, per Tariff Part VII.G.336 & Manual 14H, Section 13, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In accordance with PJM Tariff Part VII, Subpart D, section 310.A and as outlined in PJM Manual 14H, Sections 4.5 and 13, in Phase II of the Cycle, PJM provides the Affected System Operator any updates on the PJM projects that require an Affected Systems Study based on their response at DP1. New Service Requests that require an Affected Systems Study are required to enter into an Affected Systems Study Agreement with the Affected System Operator, as applicable, prior to the close of DP2 or they will be withdrawn from the Cycle.

If the Project Developer already entered into the necessary agreement and the results are available, PJM will supply them in the Phase II SIS report. See below for the status of any required Affected Systems Study. A status of “Pending” means that the study is not yet completed by the Affected System Operator. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

No cost allocated system reinforcements were identified for this project in the Phase II System Impact Study load flow analysis.

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: b3780.7
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.7
Title
Build new Batavia Road substation (Projected ISD 12/31/2028)
Description
Build Batavia Road substation. Add 4 x 230kV breaker bays
Cost Information
Time Estimate
Dec 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.8
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.8
Title
Graceton 500 kV substation expansion (Projected ISD 12/31/2028)
Description
Add 3x 500 kV breaker bays, 2x 500/230 kV auto transformer, 1x 500 kV caps
Cost Information
Time Estimate
Dec 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.9
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.9
Title
Graceton to Batavia Road 230 kV double circuit pole line (Projected ISD 12/31/2028)
Description
Graceton to Batavia Road 230 kV double circuit pole line New rating: 1331 MVA SN/ 1594 MVA SE
Cost Information
Time Estimate
Dec 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.13
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.13
Title
Batavia Road to Riverside 230 kV reconductor
Description
Batavia Road to Riverside 230 kV reconductor New rating: 1941 MVA SN / 2181 MVA SE
Cost Information
Time Estimate
Dec 31 2027

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.15
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.15
Title
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub
Description
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV substation by rebuilding 5012 between new terminal at Peach Bottom South and North Delta on single circuit structures and terminating at North Delta.
Cost Information
Time Estimate
Apr 10 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.17
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.17
Title
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub (Transource)
Description
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV substation by rebuilding 5012 between new terminal at Peach Bottom South and North Delta on single circuit structures and terminating at North Delta (Transource Scope).
Cost Information
Time Estimate
May 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.34
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.34
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV and cut into North Delta 500kV (Projected ISD 12/31/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.35
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.35
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV (Projected ISD 12/1/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Apr 10 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.36
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.36
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV (Projected ISD 12/31/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.52
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.52
Title
Reconfigure Peach Bottom North and South 500 kV yards (Projected ISD 12/1/2030)
Description
Reconfigure Peach Bottom North and South yards to allow for termination of 500 kV lines from Peach Bottom to North Delta. North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line.
Cost Information
Time Estimate
Dec 01 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.14
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.14
Title
Reconfigure Cooper transmission feeds by establishing new Cooper-North Delta 230 kV line and rerouting existing transmissions lines by Cooper.
Description
None
Cost Information
Time Estimate
Oct 23 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.16
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.16
Title
Terminate new Cooper-North Delta 230 kV line (Transource Scope) at North Delta 230 kV
Description
None
Cost Information
Time Estimate
Oct 15 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.45
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.45
Title
North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (PECO work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Jan 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.50
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.50
Title
North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (Transource work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Jan 23 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.46
Type
Load Flow
TO
PEPCO
RTEP ID / TO ID
b3800.46
Title
North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (PECO work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Dec 11 2029

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.51
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.51
Title
North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (Transource work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
May 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.31
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.31
Title
Build new North Delta-High Ridge 500 kV line - PECO Portion (Projected ISD 12/1/2030)
Description
None
Cost Information
Time Estimate
Dec 15 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.44
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.44
Title
North Delta termination for the North Delta-High Ridge 500 line (PECO work).
Description
None
Cost Information
Time Estimate
Dec 15 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.48
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.48
Title
North Delta termination for the North Delta-High Ridge 500 line (Transource work).
Description
None
Cost Information
Time Estimate
Dec 15 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3737.47
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3737.47
Title
Build New North Delta 500 kV substation (Four bay breaker and half configuration)
Description
Build New North Delta 500 kV substation (four bay breaker and half configuration) - the substation will include 12 - 500kV breakers and one 500/230 kV transformer, will allow the termination of six - 500 kV lines
Cost Information
Time Estimate
Oct 06 2027

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.1
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.1
Title
Peach Bottom North upgrades – substation work (Projected ISD 12/31/2028)
Description
Add 3x 500 kV breakers to form a breaker-and-a-half bay.
Cost Information
Time Estimate
Oct 15 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.29
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.29
Title
High Ridge termination for the North Delta-High Ridge 500 kV line (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.5
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.5
Title
Build Solley Road substation + Statcom (Projected ISD 12/31/2028)
Description
Build Solley Road substation + Statcom. New STATCOM rating: 350 MVAR Add 4x 230 kV breakers bays.
Cost Information
Time Estimate
Dec 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.11
Type
Load Flow
TO
PEPCO
RTEP ID / TO ID
b3780.11
Title
Brighton Statcom and Capacitor (Projected ISD 12/31/2028)
Description
Brighton Statcom and capacitor New STATCOM rating: 350 MVAR New capacitor rating: 350 MVAR
Cost Information
Time Estimate
Dec 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.6
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.6
Title
Build Granite substation + Statcom (Projected ISD 12/31/2028)
Description
Build Granite substation + Statcom. New STATCOM rating: 350 MVAR. Add 4x 230 kV breaker bays.
Cost Information
Time Estimate
Dec 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.37
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.37
Title
Replace terminal equipment limitations at Conastone 500 kV - on the (existing Peach Bottom-Conastone) or (new Graceton-Conastone) 500 kV line (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.49
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.49
Title
North Delta 500 kV termination for the Calpine generator (Calpine/Transource work).
Description
None
Cost Information
Time Estimate
Oct 06 2027

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.42
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.42
Title
Peach Bottom 500kV North bus upgrade (Projected ISD 12/1/2030)
Description
Peach Bottom 500kV North bus upgrade - Replace 11 – Instances of strain bus conductor used for breaker drops or CT drops, 7 – 500 kV disconnect switches, 7 – Free Standing CTs, 1 – 500 kV breaker, 2 – Breaker relays or meters.
Cost Information
Time Estimate
Dec 01 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.47
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.47
Title
Build new Peach Bottom South-North Delta 500 kV line (Projected ISD 12/1/2030)
Description
Build new Peach Bottom South-North Delta 500 kV line – cut in to Peach Bottom tie No. 1 and extending line to North Delta (~1.25 miles new ROW).
Cost Information
Time Estimate
Jan 14 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.32
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.32
Title
Build new North Delta-High Ridge 500 kV line - BGE Portion (Projected ISD 12/31/2030)
Description
Build new North Delta-High Ridge 500 kV line. (~59 miles)
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.26
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.26
Title
Build High Ridge 500 kV substation - Three bay breaker and half configuration (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.27
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.27
Title
High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) - Waugh Chapel side (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.28
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.28
Title
High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) -Brighton side (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.30
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.30
Title
High Ridge - Install two 500/230 kV transformers (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.33
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.33
Title
Replace terminal equipment limitations at Brighton 500 kV - on the existing Brighton-Waugh Chapel 500 kV (5053) or new Brighton-High Ridge 500 kV.
Description
None
Cost Information
Time Estimate
Dec 31 2030

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.2
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.2
Title
Peach Bottom to Graceton (PECO Portion) – New 500kV Line
Description
Peach Bottom to Graceton (PECO Portion) – New 500kV Line. New rating: 4503 MVA SN/ 5022 MVA SE. This is a baseline identified for the announced Brandon Shores deactivation.
Cost Information
Time Estimate
Oct 23 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.4
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.4
Title
Peach Bottom to Graceton (BGE Portion) – New 500kV Line
Description
New rating: 4503 MVA SN/ 5022 MVA SE. This is a baseline identified for the announced Brandon Shores deactivation.
Cost Information
Time Estimate
Dec 31 2028

Not ContingentTopology Changing

Note 1: AG2-484 contributes to the loading of an overloaded facility that is being mitigated by a planned baseline upgrade. AG2-484 is not contingent on this baseline upgrade as it does not meet the criteria for being a contingent facility or for having cost allocation for the upgrade.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
BRIGHTON-CNASTONE 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AG2-484


AG2-484 Contributions into Topology or Eliminated Reinforcements:
TypeTORTEP ID / TO IDTitleTopo or ElimMW ImpactPercent AllocationCategoryAllocated Cost ($USD)
Contributions into Topology or Eliminated Reinforcement Total:$0
AG2-484 Contingent Region Topology Upgrades:
TORTEP IDTitleCategoryAllocated Cost ($USD)
Region Topology Upgrade Total:$0

Attachments

AG2-484 One Line Diagram

AG2-484 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.
Winter load flow analysis will be performed starting in Transition Cycle 2.