AH1-260 Phase II System Impact Study Report

v1.00 released 2026-06-03 18:26

New Freedom - Monroe 230 kV

300.0 MW Capacity / 300.0 MW Energy

Introduction

This Phase II System Impact Study (SIS) Report has been prepared in accordance with the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 310 for New Service Requests (projects) in Transition Cycle 2 (TC2). The Project Developer/Eligible Customer (developer) is Haddy Energy Storage LLC, and the Transmission Provider (TP) is PJM Interconnection, LLC (PJM). The interconnected Transmission Owner (TO) is Atlantic City Electric.

Preface

The Phase II System Impact Study is conducted on an aggregate basis within a New Services Request’s Cycle, and results are provided in both (i) a single Cycle summary format and (ii) an individual project-level basis. The Phase II System Impact Study Results (for both the summary and individual reports) will be publicly available on PJM’s website. Project Developers must obtain the results from the website.

In accordance with PJM Manual 14H, section 4.5, PJM takes the following actions during the Phase II System Impact Study:

  1. PJM will retool load flow results from the Phase I System Impact Study (summer peak, winter peak and light load) based on decisions made by Project Developers or Eligible Customers during Decision Point I.
  2. PJM will conduct any required voltage analyses.
  3. PJM will perform short circuit and stability analyses as required.
  4. PJM will coordinate with the Affected System to confirm which projects in the PJM Cycle will require Affected System studies. If the Affected System Operator indicates that an Affected System study is required, PJM will:
    1. Notify the Project Developer or Eligible Customer of the need for an Affected System study and the requirement to execute an Affected System study agreement with the impacted Affected System Operator, and;
    2. Include the results of the Affected System Operator’s Affected System Study in the Phase II System Impact Study results, if applicable and available.
  5. The Phase II System Impact Study Results will be publicly available on PJM’s website. Project Developers and Eligible Customers must obtain the results from the website.

The Transmission Owner takes the following actions during the Phase II System Impact Study:

  1. Verify Interconnection Facilities and Network Upgrades required to accommodate the New Service Request.
  2. Perform a Facilities Study. The Facilities Study in Phase II System Impact Study phase will be for the physical Interconnection Facilities. The Facilities Study requirements are outlined in Attachment C of this manual. The study will be conducted pursuant to Tariff, Part VII, Subpart D, section 307(A)(7) and Tariff, Part VIII, Subpart C, section 404(A)(7).

Decision Point II Requirements

At the close of Phase II System Impact Study, PJM will initiate Decision Point II (DP2). During DP2, the Project Developer will have 30 days to decide whether to proceed with their project. If the Project Developer elects to proceed, they should provide the elements defined in the PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.A. Additional information on these elements is available in PJM Manual 14H sections 4.6, 6, and 7.

Allowable project modifications at Decision Point II are defined in PJM Open Access Transmission Tariff, Part VII, Subpart D, section 311.B. Additional information regarding allowable project modifications can be found in PJM Manual 14H, section 9.8.

Adverse Test Eligibility

This New Service Request does not meet the Adverse Study Impact Criteria and has the option to either move forward in the Cycle process or withdraw at DP2 with Readiness Deposit #1 forfeited. See adverse study impact calculation below.

This section details whether a Project Developer or Eligible Customer qualifies for the Adverse Study Impact clause outlined in the PJM OATT, Part VII, Subpart D, section 311.B and Manual 14H, section 6.2.2. In order to qualify for an Adverse Study Impact at Decision Point II, the Network Upgrade cost from Phase I to Phase II must:

  1. Increase overall by 25% or more
  2. Increases by more than $10,000 per MW (Includes Costs identified in Affected System studies)

If a New Service Request meets the criteria above and chooses to withdraw the request, PJM will refund the cumulative Readiness Deposit amounts paid at the Application Phase and at Decision Point I (RD1 and RD2, respectively).

The below calculations show the computation of this New Service Request's Adverse Study Impact

DP2 Adverse Eligibility = DP2 Adverse Cost Alloc DP1 Adverse Cost Alloc > 1.25 AND ( DP2 Adverse Cost Alloc - DP1 Adverse Cost Alloc ) Project Size > $10,000 per MW
DP2 Adverse Eligibility = $24,319,043 $24,307,000 = 1.00 AND ( $24,319,043 - $24,307,000 ) 300.0 = $40 per MW

General

The Project Developer has proposed a Storage facility located in the Atlantic City Electric zone — Camden County, New Jersey. The installed facilities will have a total capability of 300.0 MW with 300.0 MW of this output being recognized by PJM as Capacity.

Project Information
New Service Request Number:
AH1-260
Project Name:
New Freedom - Monroe 230 kV
Project Developer Name:
Haddy Energy Storage LLC
State:
New Jersey
County:
Camden
Transmission Owner:
Atlantic City Electric
MFO:
300.0
MWE:
300.0
MWC:
300.0
Battery Storage Specification:
1200.0 MWh, 4.0-hr class
Grid Charging:
Yes
Fuel Type:
Storage
Basecase Study Year:
2028

Physical Interconnection Facility Study

Report Available

The transmission owner has completed the Physical Interconnection Facilities Study. This report is available for download.

Point of Interconnection

AH1-260 will interconnect with the Atlantic City Electric  transmission system by tapping the New Freedom - Monroe 230 kV Line.

Cost Summary

The table below shows a summary of the total cost estimates for this New Service Request project. In Phase II SIS, the interconnected Transmission Owner has performed a facilities study for both the Transmission Owner Interconnection Facilities (TOIF) and Physical Interconnection Network Upgrades. The System Reliability Network Upgrade shown in the table are planning level cost estimates which are subject to change as a result of a facility study performed by the TO during Phase III System Impact Study.

Based on the Phase II SIS results, the AH1-260 project has the following allocation of costs for interconnection. The cost contribution towards Readiness Deposit #3 are also shown below.

Cost Summary
DescriptionCost Allocated to AH1-260Cost Subject to Readiness*Cost Subject to Adverse
Transmission Owner Interconnection Facilities (TOIF)$485,734$0$0
Other Scope$0$0$0
Option To Build Oversight$0$0$0
Physical Interconnection Network Upgrades
Stand Alone Network Upgrades$20,646,413$20,646,413$20,646,413
Network Upgrades$3,672,630$3,672,630$3,672,630
System Reliability Network Upgrades
Steady State Thermal & Voltage$0$0$0
Transient Stability$0$0$0
Short Circuit$0$0$0
Transmission Owner Analysis
SubRegional$0$0$0
Distribution$0$0$0
Affected System Reinforcements
AFS - PJM Violations$0$0$0
AFS - Non-PJM Violations$0$0$0
Total$24,804,777$24,319,043$24,319,043

* Contributes to calculation for Readiness Deposit #3 (RD3). See Readiness Deposit section of report for additional detail.

Definitions

Transmission Owner Interconnection Facilities: Facilities that are owned, controlled, operated and maintained by the Transmission Owner on the Transmission Owner’s side of the Point of Change of Ownership to the Point of Interconnection, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Generating Facility with the Transmission System or interconnected distribution facilities.

Stand Alone Network Upgrades: Network Upgrades, which are not part of an Affected System, which a Project Developer may construct without affecting day-to-day operations (e.g. taking a transmission outage) of the Transmission System during their construction.

Network Upgrades: Modifications or additions to transmission-related facilities that are integrated with and support the Transmission Provider’s overall Transmission System for the general benefit of all users of such Transmission System. Network Upgrades have no impact or potential impact on the Transmission System until the final tie-in is complete.

Notes

Note 1: PJM Open Access Transmission Tariff (OATT), Part VII, Subpart D, section 307.5 outlines cost allocation rules. The rules are further clarified in PJM Manual 14H, section 4.2.6. PJM shall identify the New Service Requests in the Cycle contributing to the need for the required Network Upgrades within the Cycle. All New Service Requests that contribute to the need for a Network Upgrade will receive cost allocation for that upgrade pursuant to each New Service Request’s contribution to the reliability violation identified on the transmission system in accordance with PJM Manuals.

Note 2: There will be no inter-Cycle cost allocation for Interconnection Facilities or Network Upgrades identified in the System Impact Study costs identified in a Cycle; all such costs shall be allocated to New Service Requests in that Cycle.

Note 3: For Project Developers with System Reinforcements listed: If this project presents cost allocation to a System Reinforcement indicates $0, then please be aware that as changes to the interconnection process occur, such as other projects withdrawing, reducing in size, etc, the cost responsibilities can change and a cost allocation may be assigned to this project. In addition, although this project presents cost allocation to a System Reinforcement is presently $0, this project may need this system reinforcement completed to be deliverable to the PJM system. If this project desires to come into service prior to completion of the system reinforcement, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the system reinforcement is complete.

Note 4: Please see the ‘Affected Systems Studies’ section of this Phase II SIS report for details on your project’s need for an Affected Systems Study. If your project requires an Affected Systems Study, the Affected Systems impacts may not be available from the Affected System Operator at the time of the PJM Phase II SIS. Therefore, the cost in this section would not reflect any required upgrades by the Affected System until the study is completed. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Readiness Deposit

Per Tariff Part VII, Subpart D, section 311 (Decision Point II) A.1.b and PJM Manual 14H, section 6.2, Readiness Deposit #3 (RD3) are funds committed by the Project Developer or Eligible Customer based upon the applicable contribution to Network Upgrades as defined below. Readiness Deposits are not used to fund studies nor to offset Security.

During Decision Point II (DP2), the Project Developer or Eligible Customer is required to submit Readiness Deposit #3, which is calculated as 20% of cost allocation for required Phase II Network Upgrades minus Readiness Deposit #1 & Readiness Deposit #2.

Note 1: “Network Upgrades” referred to in the calculation include both (i) the Physical Interconnection Network Upgrades and (ii) the System Reliability Network Upgrades as shown in the Cost Summary table.

Note 2: Readiness Deposit #1 (RD1) = ($4,000 * Project Size (MW))

Note 3: Readiness Deposit #2 (RD2) = 10% of cost allocation for required Network Upgrades minus RD1. Readiness Deposit #2 (RD2) can be zero, but may not be a negative number.

Note 4: Readiness Deposit #3 can be zero, but may not be a negative number.

Readiness Deposit #3 Due for Project AH1-260

Readiness Deposit #3 has been calculated for the project based on the Phase II System Impact Study results and is shown in the table below. This Readiness Deposit #3 must be provided at Decision Point II through either a wire transfer or letter of credit per Manual 14H, Section 6.2.

Readiness Deposit #3 Due for AH1-260
Project ID: AH1-260
20% of cost allocation for Phase II Network Upgrades:(A) $4,863,809
Sum of Readiness Deposit #1 & Readiness Deposit #2 Received:(B) $3,101,161
Readiness Deposit #3 (RD3) due at DP2:(A) - (B) = $1,762,647
Note: Failure to provide an acceptable form of Readiness Deposit #3 by the end of Decision Point II will result in withdrawal and termination of the New Service Request.

For additional detail regarding Readiness Deposit Refunds, reference PJM Manual 14H, section 6.2.1. The Readiness Deposit Letter of Credit template can be found here.

Transmission Owner Scope of Work

The total preliminary cost estimate for the Transmission Owner scope of work (including TOIF and Physical Interconnection Network Upgrades) is given in the table below. These costs do not include CIAC Tax Gross-up.

Transmission Owner Build Option
Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Extend existing transmission line Monroe - New Freedom to connect into new substation terminals. Upgrade relaying at Monroe substation.

$1,039,830$993,021$710,322$577,457$3,320,630$3,320,630
(Pending)

Replace line relays at New Freedom for the 2305 circuit entering the station from the proposed AH1-260 substation (PSEG Scope)

$234,000$72,000$35,000$11,000$352,000$352,000
Stand-Alone Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Build new 4-breaker ring bus substation by cutting into the existing 2305 230KV Monroe – New Freedom line. New substation will have potential for expansion to a 6 position BAAH bus. Install fiber to site location.

$9,008,048$4,003,584$5,045,896$2,561,067$20,618,594$20,618,594
(Pending)

Fiber Installation in New ROW

$14,991$4,482$6,425$1,921$27,819$27,819
Transmission Owner Interconnection Facilities
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Provide OHT line to point of change in ownership from new substation. Install and terminate fiber from interconnection.

$68,659$145,064$87,385$184,626$485,734$485,734
Developer Build Option

Project Developer has the option ("Option to Build") to assume responsibility for the design, procurement and construction of Transmission Owner Interconnection Facilities and/or Stand-Alone Network Upgrades.

If Option to Build is elected, the Project Developer must fulfill additional requirements in accordance to PJM Manual 14C, section 5.1 and PJM Manual 14H, section 8.6.2.

The cost estimates for eligible facilities and Option to Build oversight are highlighted below:

Network Upgrades
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Extend existing transmission line Monroe - New Freedom to connect into new substation terminals. Upgrade relaying at Monroe substation.

$1,039,830$993,021$710,322$577,457$3,320,630$3,320,630
(Pending)

Replace line relays at New Freedom for the 2305 circuit entering the station from the proposed AH1-260 substation (PSEG Scope)

$234,000$72,000$35,000$11,000$352,000$352,000
Option to Build Oversight
RTEP IDDescriptionDirectIndirectTotal Cost ($USD)Allocated Cost ($USD)
LaborMaterialsLaborMaterials
(Pending)

Stand Alone Network Upgrade (oversight), AEC will only be responsible for engineering and construction oversight as well as final commissioning of the substation prior to energization. A separate cost estimate has been provided.

$887,335$0$505,781$0$1,393,116$1,393,116
(Pending)

Transmission Owner Interconnection Facilities (Oversight): AEC will only be responsible for engineering and construction oversight as well as final commissioning of the substation prior to energization.

$20,598$0$26,215$0$46,813$46,813
(Pending)

Fiber Installation in New ROW (Oversight)

$14,991$0$6,424$0$21,415$21,415
Build Option Price Comparison
Build OptionTotal CostAllocated Cost
Transmission Owner Build Option$24,804,777$24,804,777
Developer Build Option$5,133,974$5,133,974

Based on the scope of work for the Interconnection Facilities, it is expected to take a range of 42 to 54 month(s) after the signing of a Generator Interconnection Agreement (as this is a FERC connection) and construction kickoff call to complete the installation of the physical connection work. This assumes that there will be no environmental issues with any of the new properties associated with this project, that there will be no delays in acquiring the necessary permits for implementing the defined interconnection work, and that all system outages will be allowed when requested.

Note that the TO findings were made from a conceptual review of this project. A more detailed review of the connection facilities and their cost will be identified in a future study phase. Further note that the cost estimate data provided should be considered high level estimates since it was produced without a detailed engineering review. The Project Developer will be responsible for the actual cost of construction. TO herein reserves the right to return to any issues in this document and, upon appropriate justification, request additional monies to complete any reinforcements to the transmission systems.

Remote Terminal Work: During Phase II of the PJM interconnection process, TO’s System Protection Engineering Department will review transmission line protection as well as anti-islanding required to accommodate the new generation and interconnection substation. System Protection Engineering will determine the minimal acceptable protection requirements to reliably interconnect the proposed generating facility with the transmission system. The review is based on maintaining system reliability by reviewing TO’s protection requirements with the known transmission system configuration which includes generating facilities in the area. This review may determine that transmission line protection and communication upgrades are required at remote substations.

Transmission Owner Analysis

No impacts identified by Transmission Owner

 

Developer Requirements

The developer is responsible for all design and construction related activities on the developer’s side of the Point of Change in Ownership. AEC interconnection requirements can be found here.

To the extent that these Applicable Technical Requirements and Standards may conflict with the terms and conditions of the Tariff, the Tariff shall control.

Revenue Metering and SCADA Requirements

PJM Requirements
The developer will be required to install equipment necessary to provide Revenue Metering (KWH, KVARH) and real time data (KW, KVAR) for their generating Resource. See PJM Manual 01, PJM Manual 14D, and PJM Tariff Part IX, Subpart B, Appendix 2, section 8.
Transmission Owner Requirements
The Project Developer will be required to comply with all interconnected Transmission Owner’s revenue metering requirements located at the following link: PJM - Transmission Owner Engineering & Construction Standards.

Summer Peak Analysis

The New Service Request AH1-260 was evaluated as a 300.0 MW (300.0 MW Capacity) injection in the AEC area.

AH1-260 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 300.0 MW (300.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2PECO
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
PECO_P4_CHICH045_SRT-A/* $ DELCO $ PECO_P4_CHICH045 $ STBK
BreakerAC102.49 %1180.0B1209.36
62.28
GD2PECO
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
PECO_P2-2_CHI230B1_SRT-A/* $ DELCO $ PECO_P2-2_CHI230B1 $ B
BusAC102.48 %1180.0B1209.3
62.28
GD2PECO
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
PECO_P4_CHICH195_SRT-A/* $ DELCO $ PECO_P4_CHICH195 $ STBK
BreakerAC102.48 %1180.0B1209.29
62.28
GD2PECO
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
PECO_P4_CHICH435_SRT-A/* $ DELCO $ PECO_P4_CHICH435 $ STBK
BreakerAC102.48 %1180.0B1209.25
62.28

Details for RICHMOND35-WANEETA3 230.0 kV Ckt 1 line l/o PECO_P4_CHICH045_SRT-A/* $ DELCO $ PECO_P4_CHICH045 $ STBK


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PECO
Facility Description:
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_CHICH045_SRT-A/* $ DELCO $ PECO_P4_CHICH045 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.49 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1209.36
MW Contribution:
62.28
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PECO
Facility Description:
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_CHICH045_SRT-A/* $ DELCO $ PECO_P4_CHICH045 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.95 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1273.83
MW Contribution:
62.65
Bus #Bus NameTypeMW Contribution
20628028LAKEHURS
Adder
0.49
20635828PARLN1&2
Adder
0.985
20635828PARLN1&2
Adder
2.175
20635928PARLN3&4
Adder
0.985
20635928PARLN3&4
Adder
2.175
20636028O CRK C1
Adder
3.875
20636128O CRK C2
Adder
3.533
20641628MLH_W1-032
Solar/Wind Harmer
0.099
20714428HOW_X1-037
Solar/Wind Harmer
0.482
20714528FRN_Y2-051
Solar/Wind Harmer
0.134
20714828MDF_W3-079
Solar/Wind Harmer
0.14
20714928UPF_X1-085
Solar/Wind Harmer
0.228
20715028HAN_X4-015
Solar/Wind Harmer
0.198
20715228NPK_W1-113
Solar/Wind Harmer
0.144
20715728PEM_W1-119
Solar/Wind Harmer
0.342
20715828PEM_W1-120
Solar/Wind Harmer
0.342
20716028EGP_W2-019
Solar/Wind Harmer
0.31
20716228APLW2-078
Solar/Wind Harmer
0.296
20716428NHV_W2-082
Solar/Wind Harmer
1.178
20716928W4-060COL
Solar/Wind Harmer
0.23
20717128DIX_Z2-102
Solar/Wind Harmer
0.859
20720428HOL_W1-112
Solar/Wind Harmer
0.122
20720528MAN_W1-024
Solar/Wind Harmer
0.086
20720628TIN_W1-124
Solar/Wind Harmer
0.386
20720728JCB_W1-129
Solar/Wind Harmer
0.199
20720828JCB_W4-025
Solar/Wind Harmer
0.302
213400COVANTA DELA
50/50
0.988
213535CROYDN11
50/50
11.248
213536CROYDN12
50/50
1.292
213537CROYDN21
50/50
0.615
213538CROYDN22
50/50
0.615
213539CROYDN31
50/50
0.615
213540CROYDN32
50/50
0.603
213541CROYDN41
50/50
0.615
213542CROYDN42
50/50
0.615
213611FALLS1-3
Adder
2.497
213611FALLS1-3
Adder
2.497
213611FALLS1-3
Adder
2.497
213616FORDACT1
50/50
2.109
213617FORDACT2
50/50
2.109
213618FORDAST1
50/50
2.931
213619FORDBCT1
50/50
2.118
213620FORDBCT2
50/50
2.118
213621FORDBST1
50/50
2.939
213918RICHMD91
50/50
1.23
213919RICHMD92
50/50
1.23
214067T20SOLAR
Solar/Wind Harmer
0.178
217213AMBOY SO C
Solar/Wind Harmer
0.031
231907DC10
Adder
1.563
231917EM10
Adder
1.278
231918WEST 1
Adder
1.709
231919CHRIST1
Adder
2.298
231920CHRIST2
Adder
2.247
231940T-011
Adder
0.344
232404W1-003 C
Solar/Wind Harmer
0.46
232408W1-005 C
Solar/Wind Harmer
0.46
232410W1-006 C
Solar/Wind Harmer
0.46
232417X3-008 C
Solar/Wind Harmer
0.51
232426Y1-080 FULL
Solar/Wind Harmer
0.087
232428Y3-058 C
Solar/Wind Harmer
0.382
232813VAUGHN
Adder
0.269
232901NORTHST
Adder
3.938
232902EASTMUNI
Adder
5.803
232904IR4
Adder
37.423
232907VN8
Adder
13.709
232912OH NUG1
Adder
4.062
232913OH NUG2
Adder
4.008
232914OH NUG3
Adder
4.062
232915OH NUG4
Adder
4.035
232916OH NUG5
Adder
4.062
232917OH NUG6
Adder
4.044
232918OH NUG7
Adder
4.035
232919VN10
Adder
1.281
232920IR10
Adder
1.462
232921TASLEY2G
Adder
2.374
232926CRISFLD1
Adder
0.902
217197RE CRAN C
Solar/Wind Harmer
0.202
218428ETC SOLAR C
Solar/Wind Harmer
0.009
218438BLK ROCK C
Solar/Wind Harmer
0.051
218440SUMMTASSOC C
Solar/Wind Harmer
0.032
218660EHAMPSOLAR C
Solar/Wind Harmer
0.18
219114HARTZY_C
Solar/Wind Harmer
0.589
219124CAMDEN_STG
50/50
1.201
219126CAMDEN_CTG
50/50
1.475
219137THOSOLAR C
Solar/Wind Harmer
1.626
219236SOUTHERNHQ C
Solar/Wind Harmer
0.095
219272CLEANLIGHT C
Solar/Wind Harmer
0.201
219276PARKLANDSO C
Solar/Wind Harmer
0.249
219286CAMD CO RR
50/50
0.44
219287REEVESEAST C
Solar/Wind Harmer
1.363
219291REEVESSOUT C
Solar/Wind Harmer
0.062
219348LDSOLAR C
Solar/Wind Harmer
0.647
219607WPEMNERT C
Solar/Wind Harmer
0.453
219610FLORENCE C
Solar/Wind Harmer
1.497
219612MATRIX C
Solar/Wind Harmer
0.069
219615MILLCREEK C
Solar/Wind Harmer
0.291
219620RIDERU C
Solar/Wind Harmer
0.017
219766PARADISE C
Solar/Wind Harmer
0.477
219817TRENTONSOL C
Solar/Wind Harmer
0.338
227927V4-067C
Solar/Wind Harmer
0.161
228200CARL#1CT
50/50
6.548
228201CARL#2CT
50/50
6.885
228206SHRMN CT
Adder
14.391
228251CARLLS#4
50/50
0.631
228260V4-054C
Solar/Wind Harmer
0.967
228307PCLP GT
50/50
14.42
228400MICK 1CT
50/50
14.896
228711V2-041C
Solar/Wind Harmer
0.516
228728W1-130C
Solar/Wind Harmer
0.631
228729W2-030 C
Solar/Wind Harmer
0.474
228732V1-021 C
Adder
0.158
232406W1-004 FULL
Solar/Wind Harmer
0.46
232436AB1-176 C
Solar/Wind Harmer
0.099
230415AB2-049 C
Solar/Wind Harmer
0.187
20742028HF_AC1-207
Solar/Wind Harmer
0.26
207454AA2-184 E
Solar/Wind Harmer
0.387
207459AE1-142 C O1
Solar/Wind Harmer
0.543
232424Y1-079 C
Solar/Wind Harmer
0.246
232900DEMECSMY
Adder
4.342
232905CHERITON_25
Adder
1.128
218524CNTRALGAS1 C
Solar/Wind Harmer
0.093
218526CNTRALGAS2 C
Solar/Wind Harmer
0.099
219267WHEELBRDEPTF
50/50
0.204
233901CHERRYDALE C
Solar/Wind Harmer
0.517
233939AC1-091 C
Solar/Wind Harmer
1.278
233940AF2-379 C
Solar/Wind Harmer
0.086
233970AC1-092 C
Solar/Wind Harmer
1.278
233971AC1-093 C
Solar/Wind Harmer
1.213
233972AC1-094 C
Solar/Wind Harmer
1.026
233973AC2-185 C
Solar/Wind Harmer
2.581
219727YARDVSOLFA C
Solar/Wind Harmer
0.596
219907AC1-030 C
Solar/Wind Harmer
0.197
228754AB1-001 C
Solar/Wind Harmer
0.115
228351V2-046C
Solar/Wind Harmer
2.08
233944AB2-135 GEN
Solar/Wind Harmer
2.261
233946AB2-136 GEN
Solar/Wind Harmer
1.813
233994AC2-023 GEN
Solar/Wind Harmer
1.231
233984AB2-036 GEN
Solar/Wind Harmer
5.464
233982AB2-133 GEN
Solar/Wind Harmer
2.079
233915AB1-141 GEN
Solar/Wind Harmer
0.422
233918AB1-142 GEN
Solar/Wind Harmer
0.422
233930AB2-032 GEN
Solar/Wind Harmer
0.356
233987AB2-037 GEN
Solar/Wind Harmer
5.123
233933AB2-153 GEN
Solar/Wind Harmer
0.48
233955AB2-172 GEN
Solar/Wind Harmer
2.266
233935AB2-179 C
Solar/Wind Harmer
0.985
234041AC1-190 GEN
Solar/Wind Harmer
4.062
233968AD2-076_GEN
Solar/Wind Harmer
2.871
234012AE2-112_GEN
Solar/Wind Harmer
0.996
234014AF1-036_GEN
Solar/Wind Harmer
1.172
234015AF2-250 C
Solar/Wind Harmer
0.055
234036AF2-325 C
Solar/Wind Harmer
0.416
207522AF2-254 C
Solar/Wind Harmer
0.945
207445AB1-138_GEN
Solar/Wind Harmer
0.299
233923SMA
Solar/Wind Harmer
1.679
230433AD2-135 GEN
Solar/Wind Harmer
0.096
230430AE1-229_GEN
Solar/Wind Harmer
28.495
219680HOPEWELLV C1
Solar/Wind Harmer
0.024
219686LUMSOLAR_N C
Solar/Wind Harmer
0.205
219688LUMSOLAR_S C
Solar/Wind Harmer
0.213
219908AB1-139 C
Solar/Wind Harmer
0.094
219904AC1-010 C
Solar/Wind Harmer
0.573
219906AC1-017 C
Solar/Wind Harmer
0.272
219623KINSLEYBEA C
Solar/Wind Harmer
0.61
219258KINSLEYDEP C
Solar/Wind Harmer
0.466
219304NAMERICA C
Solar/Wind Harmer
0.335
219921AF1-264
Solar/Wind Harmer
0.211
219924AG1-130 C
50/50
0.479
231902DC CT7
Adder
5.004
231906DC3 NUG
Adder
6.26
230511AF1-262
Solar/Wind Harmer
0.181
20635028RRCT1&2
Adder
3.264
20635028RRCT1&2
Adder
3.214
20635128RRCT3&4
Adder
3.102
20635128RRCT3&4
Adder
2.706
230434AG1-499 GEN
Solar/Wind Harmer
0.618
233964AF2-378 GEN
Solar/Wind Harmer
0.058
230407AD2-065 C
Solar/Wind Harmer
0.129
232432Z2-076 GEN
Solar/Wind Harmer
0.061
232434Z2-077 GEN
Solar/Wind Harmer
0.115
233996TM1833_GEN
Solar/Wind Harmer
0.458
233997TMININ_4.2
Solar/Wind Harmer
0.458
233998TM1NIN_3.36
Solar/Wind Harmer
0.458
959561AF2-247 GEN
Solar/Wind Harmer
0.428
963391AG1-188 GEN
Solar/Wind Harmer
2.02
963401AG1-189 GEN
Solar/Wind Harmer
1.233
970025AG2-016 GEN
Solar/Wind Harmer
1.529
970453AG2-297 GEN
Solar/Wind Harmer
2.306
970597AG2-380 GEN
Solar/Wind Harmer
1.803
970695AG2-447 GEN
Solar/Wind Harmer
1.707
970997AG2-616 GEN
Solar/Wind Harmer
9.567
971189AH1-054 GEN
Solar/Wind Harmer
0.666
971195AH1-057 GEN
Solar/Wind Harmer
0.448
971521AH1-258 GEN
Solar/Wind Harmer
0.973
971667AH1-334 GEN
Solar/Wind Harmer
1.441
219221BRL12CT1
50/50
10.238
219222BRL12CT2
50/50
10.238
219223BRL12CT3
50/50
10.238
219224BRL12CT4
50/50
10.238
219918AC2-009 C
Solar/Wind Harmer
0.008
924131AB2-057 GEN
Solar/Wind Harmer
0.304
963711AG1-223 GEN
Solar/Wind Harmer
0.68
964001AG1-254 GEN
Solar/Wind Harmer
7.522
972141AH1-641 GEN
Solar/Wind Harmer
2.87
972177AH1-672 GEN
Solar/Wind Harmer
6.234
972233AH1-701 GEN
50/50
5.235
972251AH1-710 GEN
Adder
26.009
230404GT1-CC
50/50
3.243
230405GT2-CC
50/50
3.254
230406ST-CC
50/50
4.801
971525AH1-260 GEN
50/50
62.282
219229EAGLE PT ST
50/50
0.74
219230EAGLE PT CT1
50/50
1.462
219231EAGLE PT CT2
50/50
1.461
219235Y2-105
50/50
0.528
233950AC2-186 GEN
Solar/Wind Harmer
0.259
233952AC2-187 GEN
Solar/Wind Harmer
0.518
233954AC2-188 GEN
Solar/Wind Harmer
0.518
230422AE1-104_GEN1
Solar/Wind Harmer
28.004
230425AE1-104_GEN2
Solar/Wind Harmer
28.004
232422X3-066 FULL
Solar/Wind Harmer
0.108
234033AF1-007_GEN
Solar/Wind Harmer
17.216
219919AE1-041 FULL
Solar/Wind Harmer
0.01
219912AD2-042 GEN
Solar/Wind Harmer
1.264
219914AD2-027 C
Solar/Wind Harmer
0.954
207500AE2-000G1
Solar/Wind Harmer
17.268
207497AE2-000G2
Solar/Wind Harmer
17.268
207507AE2-000G3
Solar/Wind Harmer
17.268
207487AE2-000G4
Solar/Wind Harmer
17.268
232910NRG_G1
Adder
3.914
CBM NorthLTFEXP_CBM-N->PJM
CBM
7.549
G-007ALTFEXP_G-007A->PJM
CMTX
14.195
VTFLTFEXP_VFT->PJM
CMTX
25.661
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.585
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.356
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
2.659
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.574
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
1.785
MDUPJM->LTFIMP_MDU
CLTF
0

Details for RICHMOND35-WANEETA3 230.0 kV Ckt 1 line l/o PECO_P2-2_CHI230B1_SRT-A/* $ DELCO $ PECO_P2-2_CHI230B1 $ B


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PECO
Facility Description:
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
Contingency Name:
PECO_P2-2_CHI230B1_SRT-A/* $ DELCO $ PECO_P2-2_CHI230B1 $ B
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:102.48 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1209.3
MW Contribution:
62.28
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PECO
Facility Description:
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
Contingency Name:
PECO_P2-2_CHI230B1_SRT-A/* $ DELCO $ PECO_P2-2_CHI230B1 $ B
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:107.96 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1273.88
MW Contribution:
62.65
Bus #Bus NameTypeMW Contribution
20628028LAKEHURS
Adder
0.49
20635828PARLN1&2
Adder
0.985
20635828PARLN1&2
Adder
2.175
20635928PARLN3&4
Adder
0.985
20635928PARLN3&4
Adder
2.175
20636028O CRK C1
Adder
3.875
20636128O CRK C2
Adder
3.533
20641628MLH_W1-032
Solar/Wind Harmer
0.099
20714428HOW_X1-037
Solar/Wind Harmer
0.482
20714528FRN_Y2-051
Solar/Wind Harmer
0.134
20714828MDF_W3-079
Solar/Wind Harmer
0.14
20714928UPF_X1-085
Solar/Wind Harmer
0.228
20715028HAN_X4-015
Solar/Wind Harmer
0.198
20715228NPK_W1-113
Solar/Wind Harmer
0.144
20715728PEM_W1-119
Solar/Wind Harmer
0.342
20715828PEM_W1-120
Solar/Wind Harmer
0.342
20716028EGP_W2-019
Solar/Wind Harmer
0.31
20716228APLW2-078
Solar/Wind Harmer
0.296
20716428NHV_W2-082
Solar/Wind Harmer
1.178
20716928W4-060COL
Solar/Wind Harmer
0.23
20717128DIX_Z2-102
Solar/Wind Harmer
0.859
20720428HOL_W1-112
Solar/Wind Harmer
0.122
20720528MAN_W1-024
Solar/Wind Harmer
0.086
20720628TIN_W1-124
Solar/Wind Harmer
0.386
20720728JCB_W1-129
Solar/Wind Harmer
0.199
20720828JCB_W4-025
Solar/Wind Harmer
0.302
213400COVANTA DELA
50/50
0.988
213535CROYDN11
50/50
11.248
213536CROYDN12
50/50
1.292
213537CROYDN21
50/50
0.615
213538CROYDN22
50/50
0.615
213539CROYDN31
50/50
0.615
213540CROYDN32
50/50
0.603
213541CROYDN41
50/50
0.615
213542CROYDN42
50/50
0.615
213611FALLS1-3
Adder
2.497
213611FALLS1-3
Adder
2.497
213611FALLS1-3
Adder
2.497
213616FORDACT1
50/50
2.109
213617FORDACT2
50/50
2.109
213618FORDAST1
50/50
2.931
213619FORDBCT1
50/50
2.118
213620FORDBCT2
50/50
2.118
213621FORDBST1
50/50
2.939
213918RICHMD91
50/50
1.23
213919RICHMD92
50/50
1.23
214067T20SOLAR
Solar/Wind Harmer
0.178
217213AMBOY SO C
Solar/Wind Harmer
0.031
231907DC10
Adder
1.563
231917EM10
Adder
1.278
231918WEST 1
Adder
1.709
231919CHRIST1
Adder
2.298
231920CHRIST2
Adder
2.247
231940T-011
Adder
0.344
232404W1-003 C
Solar/Wind Harmer
0.46
232408W1-005 C
Solar/Wind Harmer
0.46
232410W1-006 C
Solar/Wind Harmer
0.46
232417X3-008 C
Solar/Wind Harmer
0.51
232426Y1-080 FULL
Solar/Wind Harmer
0.087
232428Y3-058 C
Solar/Wind Harmer
0.382
232813VAUGHN
Adder
0.269
232901NORTHST
Adder
3.938
232902EASTMUNI
Adder
5.803
232904IR4
Adder
37.423
232907VN8
Adder
13.709
232912OH NUG1
Adder
4.062
232913OH NUG2
Adder
4.008
232914OH NUG3
Adder
4.062
232915OH NUG4
Adder
4.035
232916OH NUG5
Adder
4.062
232917OH NUG6
Adder
4.044
232918OH NUG7
Adder
4.035
232919VN10
Adder
1.281
232920IR10
Adder
1.462
232921TASLEY2G
Adder
2.374
232926CRISFLD1
Adder
0.902
217197RE CRAN C
Solar/Wind Harmer
0.202
218428ETC SOLAR C
Solar/Wind Harmer
0.009
218438BLK ROCK C
Solar/Wind Harmer
0.051
218440SUMMTASSOC C
Solar/Wind Harmer
0.032
218660EHAMPSOLAR C
Solar/Wind Harmer
0.18
219114HARTZY_C
Solar/Wind Harmer
0.589
219124CAMDEN_STG
50/50
1.201
219126CAMDEN_CTG
50/50
1.475
219137THOSOLAR C
Solar/Wind Harmer
1.626
219236SOUTHERNHQ C
Solar/Wind Harmer
0.095
219272CLEANLIGHT C
Solar/Wind Harmer
0.201
219276PARKLANDSO C
Solar/Wind Harmer
0.249
219286CAMD CO RR
50/50
0.44
219287REEVESEAST C
Solar/Wind Harmer
1.363
219291REEVESSOUT C
Solar/Wind Harmer
0.062
219348LDSOLAR C
Solar/Wind Harmer
0.647
219607WPEMNERT C
Solar/Wind Harmer
0.453
219610FLORENCE C
Solar/Wind Harmer
1.497
219612MATRIX C
Solar/Wind Harmer
0.069
219615MILLCREEK C
Solar/Wind Harmer
0.291
219620RIDERU C
Solar/Wind Harmer
0.017
219766PARADISE C
Solar/Wind Harmer
0.477
219817TRENTONSOL C
Solar/Wind Harmer
0.338
227927V4-067C
Solar/Wind Harmer
0.161
228200CARL#1CT
50/50
6.548
228201CARL#2CT
50/50
6.885
228206SHRMN CT
Adder
14.391
228251CARLLS#4
50/50
0.631
228260V4-054C
Solar/Wind Harmer
0.967
228307PCLP GT
50/50
14.42
228400MICK 1CT
50/50
14.896
228711V2-041C
Solar/Wind Harmer
0.516
228728W1-130C
Solar/Wind Harmer
0.631
228729W2-030 C
Solar/Wind Harmer
0.474
228732V1-021 C
Adder
0.158
232406W1-004 FULL
Solar/Wind Harmer
0.46
232436AB1-176 C
Solar/Wind Harmer
0.099
230415AB2-049 C
Solar/Wind Harmer
0.187
20742028HF_AC1-207
Solar/Wind Harmer
0.26
207454AA2-184 E
Solar/Wind Harmer
0.387
207459AE1-142 C O1
Solar/Wind Harmer
0.543
232424Y1-079 C
Solar/Wind Harmer
0.246
232900DEMECSMY
Adder
4.342
232905CHERITON_25
Adder
1.128
218524CNTRALGAS1 C
Solar/Wind Harmer
0.093
218526CNTRALGAS2 C
Solar/Wind Harmer
0.099
219267WHEELBRDEPTF
50/50
0.204
233901CHERRYDALE C
Solar/Wind Harmer
0.517
233939AC1-091 C
Solar/Wind Harmer
1.278
233940AF2-379 C
Solar/Wind Harmer
0.086
233970AC1-092 C
Solar/Wind Harmer
1.278
233971AC1-093 C
Solar/Wind Harmer
1.213
233972AC1-094 C
Solar/Wind Harmer
1.026
233973AC2-185 C
Solar/Wind Harmer
2.581
219727YARDVSOLFA C
Solar/Wind Harmer
0.596
219907AC1-030 C
Solar/Wind Harmer
0.197
228754AB1-001 C
Solar/Wind Harmer
0.115
228351V2-046C
Solar/Wind Harmer
2.08
233944AB2-135 GEN
Solar/Wind Harmer
2.261
233946AB2-136 GEN
Solar/Wind Harmer
1.813
233994AC2-023 GEN
Solar/Wind Harmer
1.231
233984AB2-036 GEN
Solar/Wind Harmer
5.464
233982AB2-133 GEN
Solar/Wind Harmer
2.079
233915AB1-141 GEN
Solar/Wind Harmer
0.422
233918AB1-142 GEN
Solar/Wind Harmer
0.422
233930AB2-032 GEN
Solar/Wind Harmer
0.356
233987AB2-037 GEN
Solar/Wind Harmer
5.123
233933AB2-153 GEN
Solar/Wind Harmer
0.48
233955AB2-172 GEN
Solar/Wind Harmer
2.266
233935AB2-179 C
Solar/Wind Harmer
0.985
234041AC1-190 GEN
Solar/Wind Harmer
4.062
233968AD2-076_GEN
Solar/Wind Harmer
2.871
234012AE2-112_GEN
Solar/Wind Harmer
0.996
234014AF1-036_GEN
Solar/Wind Harmer
1.172
234015AF2-250 C
Solar/Wind Harmer
0.055
234036AF2-325 C
Solar/Wind Harmer
0.416
207522AF2-254 C
Solar/Wind Harmer
0.945
207445AB1-138_GEN
Solar/Wind Harmer
0.299
233923SMA
Solar/Wind Harmer
1.679
230433AD2-135 GEN
Solar/Wind Harmer
0.096
230430AE1-229_GEN
Solar/Wind Harmer
28.495
219680HOPEWELLV C1
Solar/Wind Harmer
0.024
219686LUMSOLAR_N C
Solar/Wind Harmer
0.205
219688LUMSOLAR_S C
Solar/Wind Harmer
0.213
219908AB1-139 C
Solar/Wind Harmer
0.094
219904AC1-010 C
Solar/Wind Harmer
0.573
219906AC1-017 C
Solar/Wind Harmer
0.272
219623KINSLEYBEA C
Solar/Wind Harmer
0.61
219258KINSLEYDEP C
Solar/Wind Harmer
0.466
219304NAMERICA C
Solar/Wind Harmer
0.335
219921AF1-264
Solar/Wind Harmer
0.211
219924AG1-130 C
50/50
0.479
231902DC CT7
Adder
5.004
231906DC3 NUG
Adder
6.26
230511AF1-262
Solar/Wind Harmer
0.181
20635028RRCT1&2
Adder
3.264
20635028RRCT1&2
Adder
3.214
20635128RRCT3&4
Adder
3.102
20635128RRCT3&4
Adder
2.706
230434AG1-499 GEN
Solar/Wind Harmer
0.618
233964AF2-378 GEN
Solar/Wind Harmer
0.058
230407AD2-065 C
Solar/Wind Harmer
0.129
232432Z2-076 GEN
Solar/Wind Harmer
0.061
232434Z2-077 GEN
Solar/Wind Harmer
0.115
233996TM1833_GEN
Solar/Wind Harmer
0.458
233997TMININ_4.2
Solar/Wind Harmer
0.458
233998TM1NIN_3.36
Solar/Wind Harmer
0.458
959561AF2-247 GEN
Solar/Wind Harmer
0.428
963391AG1-188 GEN
Solar/Wind Harmer
2.02
963401AG1-189 GEN
Solar/Wind Harmer
1.233
970025AG2-016 GEN
Solar/Wind Harmer
1.529
970453AG2-297 GEN
Solar/Wind Harmer
2.306
970597AG2-380 GEN
Solar/Wind Harmer
1.803
970695AG2-447 GEN
Solar/Wind Harmer
1.707
970997AG2-616 GEN
Solar/Wind Harmer
9.567
971189AH1-054 GEN
Solar/Wind Harmer
0.666
971195AH1-057 GEN
Solar/Wind Harmer
0.448
971521AH1-258 GEN
Solar/Wind Harmer
0.973
971667AH1-334 GEN
Solar/Wind Harmer
1.441
219221BRL12CT1
50/50
10.238
219222BRL12CT2
50/50
10.238
219223BRL12CT3
50/50
10.238
219224BRL12CT4
50/50
10.238
219918AC2-009 C
Solar/Wind Harmer
0.008
924131AB2-057 GEN
Solar/Wind Harmer
0.304
963711AG1-223 GEN
Solar/Wind Harmer
0.68
964001AG1-254 GEN
Solar/Wind Harmer
7.522
972141AH1-641 GEN
Solar/Wind Harmer
2.87
972177AH1-672 GEN
Solar/Wind Harmer
6.234
972233AH1-701 GEN
50/50
5.235
972251AH1-710 GEN
Adder
26.009
230404GT1-CC
50/50
3.243
230405GT2-CC
50/50
3.254
230406ST-CC
50/50
4.801
971525AH1-260 GEN
50/50
62.282
219229EAGLE PT ST
50/50
0.74
219230EAGLE PT CT1
50/50
1.462
219231EAGLE PT CT2
50/50
1.461
219235Y2-105
50/50
0.528
233950AC2-186 GEN
Solar/Wind Harmer
0.259
233952AC2-187 GEN
Solar/Wind Harmer
0.518
233954AC2-188 GEN
Solar/Wind Harmer
0.518
230422AE1-104_GEN1
Solar/Wind Harmer
28.004
230425AE1-104_GEN2
Solar/Wind Harmer
28.004
232422X3-066 FULL
Solar/Wind Harmer
0.108
234033AF1-007_GEN
Solar/Wind Harmer
17.216
219919AE1-041 FULL
Solar/Wind Harmer
0.01
219912AD2-042 GEN
Solar/Wind Harmer
1.264
219914AD2-027 C
Solar/Wind Harmer
0.954
207500AE2-000G1
Solar/Wind Harmer
17.268
207497AE2-000G2
Solar/Wind Harmer
17.268
207507AE2-000G3
Solar/Wind Harmer
17.268
207487AE2-000G4
Solar/Wind Harmer
17.268
232910NRG_G1
Adder
3.914
CBM NorthLTFEXP_CBM-N->PJM
CBM
7.549
G-007ALTFEXP_G-007A->PJM
CMTX
14.195
VTFLTFEXP_VFT->PJM
CMTX
25.661
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.585
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.356
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
2.659
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.574
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
1.785
MDUPJM->LTFIMP_MDU
CLTF
0

Details for RICHMOND35-WANEETA3 230.0 kV Ckt 1 line l/o PECO_P4_CHICH195_SRT-A/* $ DELCO $ PECO_P4_CHICH195 $ STBK


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PECO
Facility Description:
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_CHICH195_SRT-A/* $ DELCO $ PECO_P4_CHICH195 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.48 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1209.29
MW Contribution:
62.28
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PECO
Facility Description:
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_CHICH195_SRT-A/* $ DELCO $ PECO_P4_CHICH195 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.95 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1273.77
MW Contribution:
62.65
Bus #Bus NameTypeMW Contribution
20628028LAKEHURS
Adder
0.49
20635828PARLN1&2
Adder
0.985
20635828PARLN1&2
Adder
2.175
20635928PARLN3&4
Adder
0.985
20635928PARLN3&4
Adder
2.175
20636028O CRK C1
Adder
3.875
20636128O CRK C2
Adder
3.533
20641628MLH_W1-032
Solar/Wind Harmer
0.099
20714428HOW_X1-037
Solar/Wind Harmer
0.482
20714528FRN_Y2-051
Solar/Wind Harmer
0.134
20714828MDF_W3-079
Solar/Wind Harmer
0.14
20714928UPF_X1-085
Solar/Wind Harmer
0.228
20715028HAN_X4-015
Solar/Wind Harmer
0.198
20715228NPK_W1-113
Solar/Wind Harmer
0.144
20715728PEM_W1-119
Solar/Wind Harmer
0.342
20715828PEM_W1-120
Solar/Wind Harmer
0.342
20716028EGP_W2-019
Solar/Wind Harmer
0.31
20716228APLW2-078
Solar/Wind Harmer
0.296
20716428NHV_W2-082
Solar/Wind Harmer
1.178
20716928W4-060COL
Solar/Wind Harmer
0.23
20717128DIX_Z2-102
Solar/Wind Harmer
0.859
20720428HOL_W1-112
Solar/Wind Harmer
0.122
20720528MAN_W1-024
Solar/Wind Harmer
0.086
20720628TIN_W1-124
Solar/Wind Harmer
0.386
20720728JCB_W1-129
Solar/Wind Harmer
0.199
20720828JCB_W4-025
Solar/Wind Harmer
0.302
213400COVANTA DELA
50/50
0.988
213535CROYDN11
50/50
11.248
213536CROYDN12
50/50
1.292
213537CROYDN21
50/50
0.615
213538CROYDN22
50/50
0.615
213539CROYDN31
50/50
0.615
213540CROYDN32
50/50
0.603
213541CROYDN41
50/50
0.615
213542CROYDN42
50/50
0.615
213611FALLS1-3
Adder
2.497
213611FALLS1-3
Adder
2.497
213611FALLS1-3
Adder
2.497
213616FORDACT1
50/50
2.109
213617FORDACT2
50/50
2.109
213618FORDAST1
50/50
2.931
213619FORDBCT1
50/50
2.118
213620FORDBCT2
50/50
2.118
213621FORDBST1
50/50
2.939
213918RICHMD91
50/50
1.23
213919RICHMD92
50/50
1.23
214067T20SOLAR
Solar/Wind Harmer
0.178
217213AMBOY SO C
Solar/Wind Harmer
0.031
231907DC10
Adder
1.563
231917EM10
Adder
1.278
231918WEST 1
Adder
1.709
231919CHRIST1
Adder
2.298
231920CHRIST2
Adder
2.247
231940T-011
Adder
0.344
232404W1-003 C
Solar/Wind Harmer
0.46
232408W1-005 C
Solar/Wind Harmer
0.46
232410W1-006 C
Solar/Wind Harmer
0.46
232417X3-008 C
Solar/Wind Harmer
0.51
232426Y1-080 FULL
Solar/Wind Harmer
0.087
232428Y3-058 C
Solar/Wind Harmer
0.382
232813VAUGHN
Adder
0.269
232901NORTHST
Adder
3.938
232902EASTMUNI
Adder
5.803
232904IR4
Adder
37.423
232907VN8
Adder
13.709
232912OH NUG1
Adder
4.062
232913OH NUG2
Adder
4.008
232914OH NUG3
Adder
4.062
232915OH NUG4
Adder
4.035
232916OH NUG5
Adder
4.062
232917OH NUG6
Adder
4.044
232918OH NUG7
Adder
4.035
232919VN10
Adder
1.281
232920IR10
Adder
1.462
232921TASLEY2G
Adder
2.374
232926CRISFLD1
Adder
0.902
217197RE CRAN C
Solar/Wind Harmer
0.202
218428ETC SOLAR C
Solar/Wind Harmer
0.009
218438BLK ROCK C
Solar/Wind Harmer
0.051
218440SUMMTASSOC C
Solar/Wind Harmer
0.032
218660EHAMPSOLAR C
Solar/Wind Harmer
0.18
219114HARTZY_C
Solar/Wind Harmer
0.589
219124CAMDEN_STG
50/50
1.201
219126CAMDEN_CTG
50/50
1.475
219137THOSOLAR C
Solar/Wind Harmer
1.626
219236SOUTHERNHQ C
Solar/Wind Harmer
0.095
219272CLEANLIGHT C
Solar/Wind Harmer
0.201
219276PARKLANDSO C
Solar/Wind Harmer
0.249
219286CAMD CO RR
50/50
0.44
219287REEVESEAST C
Solar/Wind Harmer
1.363
219291REEVESSOUT C
Solar/Wind Harmer
0.062
219348LDSOLAR C
Solar/Wind Harmer
0.647
219607WPEMNERT C
Solar/Wind Harmer
0.453
219610FLORENCE C
Solar/Wind Harmer
1.497
219612MATRIX C
Solar/Wind Harmer
0.069
219615MILLCREEK C
Solar/Wind Harmer
0.291
219620RIDERU C
Solar/Wind Harmer
0.017
219766PARADISE C
Solar/Wind Harmer
0.477
219817TRENTONSOL C
Solar/Wind Harmer
0.338
227927V4-067C
Solar/Wind Harmer
0.161
228200CARL#1CT
50/50
6.548
228201CARL#2CT
50/50
6.885
228206SHRMN CT
Adder
14.391
228251CARLLS#4
50/50
0.631
228260V4-054C
Solar/Wind Harmer
0.967
228307PCLP GT
50/50
14.42
228400MICK 1CT
50/50
14.896
228711V2-041C
Solar/Wind Harmer
0.516
228728W1-130C
Solar/Wind Harmer
0.631
228729W2-030 C
Solar/Wind Harmer
0.474
228732V1-021 C
Adder
0.158
232406W1-004 FULL
Solar/Wind Harmer
0.46
232436AB1-176 C
Solar/Wind Harmer
0.099
230415AB2-049 C
Solar/Wind Harmer
0.187
20742028HF_AC1-207
Solar/Wind Harmer
0.26
207454AA2-184 E
Solar/Wind Harmer
0.387
207459AE1-142 C O1
Solar/Wind Harmer
0.543
232424Y1-079 C
Solar/Wind Harmer
0.246
232900DEMECSMY
Adder
4.342
232905CHERITON_25
Adder
1.128
218524CNTRALGAS1 C
Solar/Wind Harmer
0.093
218526CNTRALGAS2 C
Solar/Wind Harmer
0.099
219267WHEELBRDEPTF
50/50
0.204
233901CHERRYDALE C
Solar/Wind Harmer
0.517
233939AC1-091 C
Solar/Wind Harmer
1.278
233940AF2-379 C
Solar/Wind Harmer
0.086
233970AC1-092 C
Solar/Wind Harmer
1.278
233971AC1-093 C
Solar/Wind Harmer
1.213
233972AC1-094 C
Solar/Wind Harmer
1.026
233973AC2-185 C
Solar/Wind Harmer
2.581
219727YARDVSOLFA C
Solar/Wind Harmer
0.596
219907AC1-030 C
Solar/Wind Harmer
0.197
228754AB1-001 C
Solar/Wind Harmer
0.115
228351V2-046C
Solar/Wind Harmer
2.08
233944AB2-135 GEN
Solar/Wind Harmer
2.261
233946AB2-136 GEN
Solar/Wind Harmer
1.813
233994AC2-023 GEN
Solar/Wind Harmer
1.231
233984AB2-036 GEN
Solar/Wind Harmer
5.464
233982AB2-133 GEN
Solar/Wind Harmer
2.079
233915AB1-141 GEN
Solar/Wind Harmer
0.422
233918AB1-142 GEN
Solar/Wind Harmer
0.422
233930AB2-032 GEN
Solar/Wind Harmer
0.356
233987AB2-037 GEN
Solar/Wind Harmer
5.123
233933AB2-153 GEN
Solar/Wind Harmer
0.48
233955AB2-172 GEN
Solar/Wind Harmer
2.266
233935AB2-179 C
Solar/Wind Harmer
0.985
234041AC1-190 GEN
Solar/Wind Harmer
4.062
233968AD2-076_GEN
Solar/Wind Harmer
2.871
234012AE2-112_GEN
Solar/Wind Harmer
0.996
234014AF1-036_GEN
Solar/Wind Harmer
1.172
234015AF2-250 C
Solar/Wind Harmer
0.055
234036AF2-325 C
Solar/Wind Harmer
0.416
207522AF2-254 C
Solar/Wind Harmer
0.945
207445AB1-138_GEN
Solar/Wind Harmer
0.299
233923SMA
Solar/Wind Harmer
1.679
230433AD2-135 GEN
Solar/Wind Harmer
0.096
230430AE1-229_GEN
Solar/Wind Harmer
28.495
219680HOPEWELLV C1
Solar/Wind Harmer
0.024
219686LUMSOLAR_N C
Solar/Wind Harmer
0.205
219688LUMSOLAR_S C
Solar/Wind Harmer
0.213
219908AB1-139 C
Solar/Wind Harmer
0.094
219904AC1-010 C
Solar/Wind Harmer
0.573
219906AC1-017 C
Solar/Wind Harmer
0.272
219623KINSLEYBEA C
Solar/Wind Harmer
0.61
219258KINSLEYDEP C
Solar/Wind Harmer
0.466
219304NAMERICA C
Solar/Wind Harmer
0.335
219921AF1-264
Solar/Wind Harmer
0.211
219924AG1-130 C
50/50
0.479
231902DC CT7
Adder
5.004
231906DC3 NUG
Adder
6.26
230511AF1-262
Solar/Wind Harmer
0.181
20635028RRCT1&2
Adder
3.264
20635028RRCT1&2
Adder
3.214
20635128RRCT3&4
Adder
3.102
20635128RRCT3&4
Adder
2.706
230434AG1-499 GEN
Solar/Wind Harmer
0.618
233964AF2-378 GEN
Solar/Wind Harmer
0.058
230407AD2-065 C
Solar/Wind Harmer
0.129
232432Z2-076 GEN
Solar/Wind Harmer
0.061
232434Z2-077 GEN
Solar/Wind Harmer
0.115
233996TM1833_GEN
Solar/Wind Harmer
0.458
233997TMININ_4.2
Solar/Wind Harmer
0.458
233998TM1NIN_3.36
Solar/Wind Harmer
0.458
959561AF2-247 GEN
Solar/Wind Harmer
0.428
963391AG1-188 GEN
Solar/Wind Harmer
2.02
963401AG1-189 GEN
Solar/Wind Harmer
1.233
970025AG2-016 GEN
Solar/Wind Harmer
1.529
970453AG2-297 GEN
Solar/Wind Harmer
2.306
970597AG2-380 GEN
Solar/Wind Harmer
1.803
970695AG2-447 GEN
Solar/Wind Harmer
1.707
970997AG2-616 GEN
Solar/Wind Harmer
9.567
971189AH1-054 GEN
Solar/Wind Harmer
0.666
971195AH1-057 GEN
Solar/Wind Harmer
0.448
971521AH1-258 GEN
Solar/Wind Harmer
0.973
971667AH1-334 GEN
Solar/Wind Harmer
1.441
219221BRL12CT1
50/50
10.238
219222BRL12CT2
50/50
10.238
219223BRL12CT3
50/50
10.238
219224BRL12CT4
50/50
10.238
219918AC2-009 C
Solar/Wind Harmer
0.008
924131AB2-057 GEN
Solar/Wind Harmer
0.304
963711AG1-223 GEN
Solar/Wind Harmer
0.68
964001AG1-254 GEN
Solar/Wind Harmer
7.522
972141AH1-641 GEN
Solar/Wind Harmer
2.87
972177AH1-672 GEN
Solar/Wind Harmer
6.234
972233AH1-701 GEN
50/50
5.235
972251AH1-710 GEN
Adder
26.009
230404GT1-CC
50/50
3.243
230405GT2-CC
50/50
3.254
230406ST-CC
50/50
4.801
971525AH1-260 GEN
50/50
62.282
219229EAGLE PT ST
50/50
0.74
219230EAGLE PT CT1
50/50
1.462
219231EAGLE PT CT2
50/50
1.461
219235Y2-105
50/50
0.528
233950AC2-186 GEN
Solar/Wind Harmer
0.259
233952AC2-187 GEN
Solar/Wind Harmer
0.518
233954AC2-188 GEN
Solar/Wind Harmer
0.518
230422AE1-104_GEN1
Solar/Wind Harmer
28.004
230425AE1-104_GEN2
Solar/Wind Harmer
28.004
232422X3-066 FULL
Solar/Wind Harmer
0.108
234033AF1-007_GEN
Solar/Wind Harmer
17.216
219919AE1-041 FULL
Solar/Wind Harmer
0.01
219912AD2-042 GEN
Solar/Wind Harmer
1.264
219914AD2-027 C
Solar/Wind Harmer
0.954
207500AE2-000G1
Solar/Wind Harmer
17.268
207497AE2-000G2
Solar/Wind Harmer
17.268
207507AE2-000G3
Solar/Wind Harmer
17.268
207487AE2-000G4
Solar/Wind Harmer
17.268
232910NRG_G1
Adder
3.914
CBM NorthLTFEXP_CBM-N->PJM
CBM
7.549
G-007ALTFEXP_G-007A->PJM
CMTX
14.195
VTFLTFEXP_VFT->PJM
CMTX
25.661
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.585
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.356
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
2.659
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.574
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
1.785
MDUPJM->LTFIMP_MDU
CLTF
0

Details for RICHMOND35-WANEETA3 230.0 kV Ckt 1 line l/o PECO_P4_CHICH435_SRT-A/* $ DELCO $ PECO_P4_CHICH435 $ STBK


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Decrease to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PECO
Facility Description:
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_CHICH435_SRT-A/* $ DELCO $ PECO_P4_CHICH435 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:102.48 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1209.25
MW Contribution:
62.28
Impact of Topology Modeling:
Decrease

Base Case Flowgate

Area:PECO
Facility Description:
RICHMOND35-WANEETA3 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_CHICH435_SRT-A/* $ DELCO $ PECO_P4_CHICH435 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.94 %
Rating:1180.0 MVA
Rating Type:B
MVA to Mitigate:1273.72
MW Contribution:
62.65
Bus #Bus NameTypeMW Contribution
20628028LAKEHURS
Adder
0.49
20635828PARLN1&2
Adder
0.985
20635828PARLN1&2
Adder
2.175
20635928PARLN3&4
Adder
0.985
20635928PARLN3&4
Adder
2.175
20636028O CRK C1
Adder
3.875
20636128O CRK C2
Adder
3.533
20641628MLH_W1-032
Solar/Wind Harmer
0.099
20714428HOW_X1-037
Solar/Wind Harmer
0.482
20714528FRN_Y2-051
Solar/Wind Harmer
0.134
20714828MDF_W3-079
Solar/Wind Harmer
0.14
20714928UPF_X1-085
Solar/Wind Harmer
0.228
20715028HAN_X4-015
Solar/Wind Harmer
0.198
20715228NPK_W1-113
Solar/Wind Harmer
0.144
20715728PEM_W1-119
Solar/Wind Harmer
0.342
20715828PEM_W1-120
Solar/Wind Harmer
0.342
20716028EGP_W2-019
Solar/Wind Harmer
0.31
20716228APLW2-078
Solar/Wind Harmer
0.296
20716428NHV_W2-082
Solar/Wind Harmer
1.178
20716928W4-060COL
Solar/Wind Harmer
0.23
20717128DIX_Z2-102
Solar/Wind Harmer
0.859
20720428HOL_W1-112
Solar/Wind Harmer
0.122
20720528MAN_W1-024
Solar/Wind Harmer
0.086
20720628TIN_W1-124
Solar/Wind Harmer
0.386
20720728JCB_W1-129
Solar/Wind Harmer
0.199
20720828JCB_W4-025
Solar/Wind Harmer
0.302
213400COVANTA DELA
50/50
0.988
213535CROYDN11
50/50
11.248
213536CROYDN12
50/50
1.292
213537CROYDN21
50/50
0.615
213538CROYDN22
50/50
0.615
213539CROYDN31
50/50
0.615
213540CROYDN32
50/50
0.603
213541CROYDN41
50/50
0.615
213542CROYDN42
50/50
0.615
213611FALLS1-3
Adder
2.497
213611FALLS1-3
Adder
2.497
213611FALLS1-3
Adder
2.497
213616FORDACT1
50/50
2.109
213617FORDACT2
50/50
2.109
213618FORDAST1
50/50
2.931
213619FORDBCT1
50/50
2.118
213620FORDBCT2
50/50
2.118
213621FORDBST1
50/50
2.939
213918RICHMD91
50/50
1.23
213919RICHMD92
50/50
1.23
214067T20SOLAR
Solar/Wind Harmer
0.178
217213AMBOY SO C
Solar/Wind Harmer
0.031
231907DC10
Adder
1.563
231917EM10
Adder
1.278
231918WEST 1
Adder
1.709
231919CHRIST1
Adder
2.297
231920CHRIST2
Adder
2.246
231940T-011
Adder
0.344
232404W1-003 C
Solar/Wind Harmer
0.46
232408W1-005 C
Solar/Wind Harmer
0.46
232410W1-006 C
Solar/Wind Harmer
0.46
232417X3-008 C
Solar/Wind Harmer
0.51
232426Y1-080 FULL
Solar/Wind Harmer
0.087
232428Y3-058 C
Solar/Wind Harmer
0.382
232813VAUGHN
Adder
0.268
232901NORTHST
Adder
3.938
232902EASTMUNI
Adder
5.802
232904IR4
Adder
37.42
232907VN8
Adder
13.708
232912OH NUG1
Adder
4.062
232913OH NUG2
Adder
4.008
232914OH NUG3
Adder
4.062
232915OH NUG4
Adder
4.035
232916OH NUG5
Adder
4.062
232917OH NUG6
Adder
4.044
232918OH NUG7
Adder
4.035
232919VN10
Adder
1.281
232920IR10
Adder
1.462
232921TASLEY2G
Adder
2.374
232926CRISFLD1
Adder
0.902
217197RE CRAN C
Solar/Wind Harmer
0.202
218428ETC SOLAR C
Solar/Wind Harmer
0.009
218438BLK ROCK C
Solar/Wind Harmer
0.051
218440SUMMTASSOC C
Solar/Wind Harmer
0.032
218660EHAMPSOLAR C
Solar/Wind Harmer
0.18
219114HARTZY_C
Solar/Wind Harmer
0.589
219124CAMDEN_STG
50/50
1.201
219126CAMDEN_CTG
50/50
1.475
219137THOSOLAR C
Solar/Wind Harmer
1.626
219236SOUTHERNHQ C
Solar/Wind Harmer
0.095
219272CLEANLIGHT C
Solar/Wind Harmer
0.201
219276PARKLANDSO C
Solar/Wind Harmer
0.249
219286CAMD CO RR
50/50
0.44
219287REEVESEAST C
Solar/Wind Harmer
1.363
219291REEVESSOUT C
Solar/Wind Harmer
0.062
219348LDSOLAR C
Solar/Wind Harmer
0.647
219607WPEMNERT C
Solar/Wind Harmer
0.453
219610FLORENCE C
Solar/Wind Harmer
1.497
219612MATRIX C
Solar/Wind Harmer
0.069
219615MILLCREEK C
Solar/Wind Harmer
0.291
219620RIDERU C
Solar/Wind Harmer
0.017
219766PARADISE C
Solar/Wind Harmer
0.477
219817TRENTONSOL C
Solar/Wind Harmer
0.338
227927V4-067C
Solar/Wind Harmer
0.161
228200CARL#1CT
50/50
6.548
228201CARL#2CT
50/50
6.885
228206SHRMN CT
Adder
14.391
228251CARLLS#4
50/50
0.631
228260V4-054C
Solar/Wind Harmer
0.967
228307PCLP GT
50/50
14.421
228400MICK 1CT
50/50
14.897
228711V2-041C
Solar/Wind Harmer
0.516
228728W1-130C
Solar/Wind Harmer
0.631
228729W2-030 C
Solar/Wind Harmer
0.474
228732V1-021 C
Adder
0.158
232406W1-004 FULL
Solar/Wind Harmer
0.46
232436AB1-176 C
Solar/Wind Harmer
0.099
230415AB2-049 C
Solar/Wind Harmer
0.187
20742028HF_AC1-207
Solar/Wind Harmer
0.26
207454AA2-184 E
Solar/Wind Harmer
0.388
207459AE1-142 C O1
Solar/Wind Harmer
0.543
232424Y1-079 C
Solar/Wind Harmer
0.246
232900DEMECSMY
Adder
4.341
232905CHERITON_25
Adder
1.128
218524CNTRALGAS1 C
Solar/Wind Harmer
0.093
218526CNTRALGAS2 C
Solar/Wind Harmer
0.099
219267WHEELBRDEPTF
50/50
0.204
233901CHERRYDALE C
Solar/Wind Harmer
0.517
233939AC1-091 C
Solar/Wind Harmer
1.277
233940AF2-379 C
Solar/Wind Harmer
0.086
233970AC1-092 C
Solar/Wind Harmer
1.277
233971AC1-093 C
Solar/Wind Harmer
1.213
233972AC1-094 C
Solar/Wind Harmer
1.026
233973AC2-185 C
Solar/Wind Harmer
2.581
219727YARDVSOLFA C
Solar/Wind Harmer
0.596
219907AC1-030 C
Solar/Wind Harmer
0.197
228754AB1-001 C
Solar/Wind Harmer
0.115
228351V2-046C
Solar/Wind Harmer
2.08
233944AB2-135 GEN
Solar/Wind Harmer
2.261
233946AB2-136 GEN
Solar/Wind Harmer
1.813
233994AC2-023 GEN
Solar/Wind Harmer
1.23
233984AB2-036 GEN
Solar/Wind Harmer
5.463
233982AB2-133 GEN
Solar/Wind Harmer
2.079
233915AB1-141 GEN
Solar/Wind Harmer
0.422
233918AB1-142 GEN
Solar/Wind Harmer
0.422
233930AB2-032 GEN
Solar/Wind Harmer
0.355
233987AB2-037 GEN
Solar/Wind Harmer
5.123
233933AB2-153 GEN
Solar/Wind Harmer
0.48
233955AB2-172 GEN
Solar/Wind Harmer
2.265
233935AB2-179 C
Solar/Wind Harmer
0.985
234041AC1-190 GEN
Solar/Wind Harmer
4.061
233968AD2-076_GEN
Solar/Wind Harmer
2.871
234012AE2-112_GEN
Solar/Wind Harmer
0.996
234014AF1-036_GEN
Solar/Wind Harmer
1.172
234015AF2-250 C
Solar/Wind Harmer
0.055
234036AF2-325 C
Solar/Wind Harmer
0.416
207522AF2-254 C
Solar/Wind Harmer
0.945
207445AB1-138_GEN
Solar/Wind Harmer
0.299
233923SMA
Solar/Wind Harmer
1.679
230433AD2-135 GEN
Solar/Wind Harmer
0.096
230430AE1-229_GEN
Solar/Wind Harmer
28.496
219680HOPEWELLV C1
Solar/Wind Harmer
0.024
219686LUMSOLAR_N C
Solar/Wind Harmer
0.205
219688LUMSOLAR_S C
Solar/Wind Harmer
0.213
219908AB1-139 C
Solar/Wind Harmer
0.094
219904AC1-010 C
Solar/Wind Harmer
0.573
219906AC1-017 C
Solar/Wind Harmer
0.272
219623KINSLEYBEA C
Solar/Wind Harmer
0.61
219258KINSLEYDEP C
Solar/Wind Harmer
0.466
219304NAMERICA C
Solar/Wind Harmer
0.335
219921AF1-264
Solar/Wind Harmer
0.211
219924AG1-130 C
50/50
0.479
231902DC CT7
Adder
5.004
231906DC3 NUG
Adder
6.259
230511AF1-262
Solar/Wind Harmer
0.181
20635028RRCT1&2
Adder
3.264
20635028RRCT1&2
Adder
3.214
20635128RRCT3&4
Adder
3.102
20635128RRCT3&4
Adder
2.706
230434AG1-499 GEN
Solar/Wind Harmer
0.618
233964AF2-378 GEN
Solar/Wind Harmer
0.058
230407AD2-065 C
Solar/Wind Harmer
0.129
232432Z2-076 GEN
Solar/Wind Harmer
0.061
232434Z2-077 GEN
Solar/Wind Harmer
0.115
233996TM1833_GEN
Solar/Wind Harmer
0.458
233997TMININ_4.2
Solar/Wind Harmer
0.458
233998TM1NIN_3.36
Solar/Wind Harmer
0.458
959561AF2-247 GEN
Solar/Wind Harmer
0.428
963391AG1-188 GEN
Solar/Wind Harmer
2.02
963401AG1-189 GEN
Solar/Wind Harmer
1.233
970025AG2-016 GEN
Solar/Wind Harmer
1.529
970453AG2-297 GEN
Solar/Wind Harmer
2.306
970597AG2-380 GEN
Solar/Wind Harmer
1.803
970695AG2-447 GEN
Solar/Wind Harmer
1.707
970997AG2-616 GEN
Solar/Wind Harmer
9.567
971189AH1-054 GEN
Solar/Wind Harmer
0.666
971195AH1-057 GEN
Solar/Wind Harmer
0.448
971521AH1-258 GEN
Solar/Wind Harmer
0.973
971667AH1-334 GEN
Solar/Wind Harmer
1.441
219221BRL12CT1
50/50
10.238
219222BRL12CT2
50/50
10.238
219223BRL12CT3
50/50
10.238
219224BRL12CT4
50/50
10.238
219918AC2-009 C
Solar/Wind Harmer
0.008
924131AB2-057 GEN
Solar/Wind Harmer
0.304
963711AG1-223 GEN
Solar/Wind Harmer
0.68
964001AG1-254 GEN
Solar/Wind Harmer
7.522
972141AH1-641 GEN
Solar/Wind Harmer
2.87
972177AH1-672 GEN
Solar/Wind Harmer
6.234
972233AH1-701 GEN
50/50
5.235
972251AH1-710 GEN
Adder
26.008
230404GT1-CC
50/50
3.243
230405GT2-CC
50/50
3.254
230406ST-CC
50/50
4.801
971525AH1-260 GEN
50/50
62.283
219229EAGLE PT ST
50/50
0.74
219230EAGLE PT CT1
50/50
1.462
219231EAGLE PT CT2
50/50
1.461
219235Y2-105
50/50
0.528
233950AC2-186 GEN
Solar/Wind Harmer
0.259
233952AC2-187 GEN
Solar/Wind Harmer
0.518
233954AC2-188 GEN
Solar/Wind Harmer
0.518
230422AE1-104_GEN1
Solar/Wind Harmer
28.005
230425AE1-104_GEN2
Solar/Wind Harmer
28.005
232422X3-066 FULL
Solar/Wind Harmer
0.108
234033AF1-007_GEN
Solar/Wind Harmer
17.214
219919AE1-041 FULL
Solar/Wind Harmer
0.01
219912AD2-042 GEN
Solar/Wind Harmer
1.264
219914AD2-027 C
Solar/Wind Harmer
0.954
207500AE2-000G1
Solar/Wind Harmer
17.268
207497AE2-000G2
Solar/Wind Harmer
17.268
207507AE2-000G3
Solar/Wind Harmer
17.268
207487AE2-000G4
Solar/Wind Harmer
17.268
232910NRG_G1
Adder
3.913
CBM NorthLTFEXP_CBM-N->PJM
CBM
7.55
G-007ALTFEXP_G-007A->PJM
CMTX
14.195
VTFLTFEXP_VFT->PJM
CMTX
25.662
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.585
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.356
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
2.659
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.574
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
1.786
MDUPJM->LTFIMP_MDU
CLTF
0
CONTINGENCY 'PECO_P4_CHICH045_SRT-A
 DISCONNECT BUS 213489   /*CHICHST1     230.0
 DISCONNECT BUS 213627   /*FOULK8       230.0
END
CONTINGENCY 'PECO_P2-2_CHI230B1_SRT-A
 DISCONNECT BUS 213489   /*CHICHST1     230.0
END
CONTINGENCY 'PECO_P4_CHICH195_SRT-A
 DISCONNECT BUS 213489   /*CHICHST1     230.0
 DISCONNECT BUS 214203   /*CHICHST1     138.0
 DISCONNECT BUS 214340   /*CHI9AB HS LD 230.0
END
CONTINGENCY 'PECO_P4_CHICH435_SRT-A
 DISCONNECT BUS 213489   /*CHICHST1     230.0
 DISCONNECT BUS 213750   /*LINWOOD43    230.0
 DISCONNECT BUS 214221   /*CHIREACT_43  230.0
END
214277 to 214012 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2PECO
WANEETA2-N PHILA 230.0 kV Ckt 1 line
PECO_P4_CHICH045_SRT-A/* $ DELCO $ PECO_P4_CHICH045 $ STBK
BreakerAC101.02 %621.0B627.32
31.55
GD2PECO
WANEETA2-N PHILA 230.0 kV Ckt 1 line
PECO_P2-2_CHI230B1_SRT-A/* $ DELCO $ PECO_P2-2_CHI230B1 $ B
BusAC101.02 %621.0B627.32
31.55
GD2PECO
WANEETA2-N PHILA 230.0 kV Ckt 1 line
PECO_P4_CHICH195_SRT-A/* $ DELCO $ PECO_P4_CHICH195 $ STBK
BreakerAC101.01 %621.0B627.26
31.55
GD2PECO
WANEETA2-N PHILA 230.0 kV Ckt 1 line
PECO_P4_CHICH435_SRT-A/* $ DELCO $ PECO_P4_CHICH435 $ STBK
BreakerAC101.01 %621.0B627.25
31.55

Details for WANEETA2-N PHILA 230.0 kV Ckt 1 line l/o PECO_P4_CHICH045_SRT-A/* $ DELCO $ PECO_P4_CHICH045 $ STBK


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
WANEETA2-N PHILA 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_CHICH045_SRT-A/* $ DELCO $ PECO_P4_CHICH045 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.02 %
Rating:621.0 MVA
Rating Type:B
MVA to Mitigate:627.32
MW Contribution:
31.55
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
20628028LAKEHURS
Adder
0.272
20636028O CRK C1
Adder
2.113
20636128O CRK C2
Adder
1.927
20714528FRN_Y2-051
Solar/Wind Harmer
0.076
20714828MDF_W3-079
Solar/Wind Harmer
0.079
20714928UPF_X1-085
Solar/Wind Harmer
0.126
20715028HAN_X4-015
Solar/Wind Harmer
0.107
20715728PEM_W1-119
Solar/Wind Harmer
0.185
20715828PEM_W1-120
Solar/Wind Harmer
0.185
20716028EGP_W2-019
Solar/Wind Harmer
0.167
20716428NHV_W2-082
Solar/Wind Harmer
0.636
20717128DIX_Z2-102
Solar/Wind Harmer
0.464
20720728JCB_W1-129
Solar/Wind Harmer
0.107
20720828JCB_W4-025
Solar/Wind Harmer
0.163
213400COVANTA DELA
50/50
0.488
213535CROYDN11
50/50
6.488
213536CROYDN12
50/50
1.431
213537CROYDN21
50/50
0.355
213538CROYDN22
50/50
0.355
213539CROYDN31
50/50
0.355
213540CROYDN32
50/50
0.348
213541CROYDN41
50/50
0.355
213542CROYDN42
50/50
0.355
213611FALLS1-3
50/50
1.819
213611FALLS1-3
50/50
1.819
213611FALLS1-3
50/50
1.819
213616FORDACT1
50/50
1.287
213617FORDACT2
50/50
1.287
213618FORDAST1
50/50
1.79
213619FORDBCT1
50/50
1.293
213620FORDBCT2
50/50
1.293
213621FORDBST1
50/50
1.794
213918RICHMD91
50/50
0.588
213919RICHMD92
50/50
0.588
214067T20SOLAR
Solar/Wind Harmer
0.122
231917EM10
Adder
0.61
231918WEST 1
Adder
0.81
231919CHRIST1
Adder
1.094
231920CHRIST2
Adder
1.069
217197RE CRAN C
Solar/Wind Harmer
0.126
218438BLK ROCK C
Solar/Wind Harmer
0.032
218660EHAMPSOLAR C
Solar/Wind Harmer
0.094
219114HARTZY_C
Solar/Wind Harmer
0.34
219124CAMDEN_STG
50/50
0.592
219126CAMDEN_CTG
50/50
0.727
219137THOSOLAR C
Solar/Wind Harmer
0.804
219236SOUTHERNHQ C
Solar/Wind Harmer
0.048
219272CLEANLIGHT C
Solar/Wind Harmer
0.104
219276PARKLANDSO C
Solar/Wind Harmer
0.15
219286CAMD CO RR
50/50
0.217
219287REEVESEAST C
Solar/Wind Harmer
0.709
219291REEVESSOUT C
Solar/Wind Harmer
0.032
219348LDSOLAR C
Solar/Wind Harmer
0.356
219607WPEMNERT C
Solar/Wind Harmer
0.249
219610FLORENCE C
Solar/Wind Harmer
0.824
219612MATRIX C
Solar/Wind Harmer
0.043
219615MILLCREEK C
Solar/Wind Harmer
0.154
219766PARADISE C
Solar/Wind Harmer
0.235
227927V4-067C
Solar/Wind Harmer
0.082
228200CARL#1CT
50/50
3.294
228201CARL#2CT
50/50
3.464
228206SHRMN CT
Adder
7.276
228251CARLLS#4
50/50
0.318
228260V4-054C
Solar/Wind Harmer
0.487
228307PCLP GT
50/50
7.178
228400MICK 1CT
50/50
7.403
228711V2-041C
Solar/Wind Harmer
0.261
228728W1-130C
Solar/Wind Harmer
0.318
228729W2-030 C
Solar/Wind Harmer
0.242
228732V1-021 C
Adder
0.08
230415AB2-049 C
Solar/Wind Harmer
0.094
207459AE1-142 C O1
Solar/Wind Harmer
0.3
219267WHEELBRDEPTF
50/50
0.101
219727YARDVSOLFA C
Solar/Wind Harmer
0.348
219907AC1-030 C
Solar/Wind Harmer
0.1
228754AB1-001 C
Solar/Wind Harmer
0.058
228351V2-046C
Solar/Wind Harmer
1.041
207522AF2-254 C
Solar/Wind Harmer
0.51
207445AB1-138_GEN
Solar/Wind Harmer
0.165
230433AD2-135 GEN
Solar/Wind Harmer
0.049
230430AE1-229_GEN
Solar/Wind Harmer
14.297
219686LUMSOLAR_N C
Solar/Wind Harmer
0.107
219688LUMSOLAR_S C
Solar/Wind Harmer
0.111
219904AC1-010 C
Solar/Wind Harmer
0.282
219906AC1-017 C
Solar/Wind Harmer
0.144
219623KINSLEYBEA C
Solar/Wind Harmer
0.301
219258KINSLEYDEP C
Solar/Wind Harmer
0.23
219304NAMERICA C
Solar/Wind Harmer
0.185
219921AF1-264
Solar/Wind Harmer
0.105
219924AG1-130 C
50/50
0.264
230511AF1-262
Solar/Wind Harmer
0.091
230434AG1-499 GEN
Solar/Wind Harmer
0.31
230407AD2-065 C
Solar/Wind Harmer
0.065
959561AF2-247 GEN
Solar/Wind Harmer
0.241
963391AG1-188 GEN
Solar/Wind Harmer
1.108
963401AG1-189 GEN
Solar/Wind Harmer
0.675
970025AG2-016 GEN
Solar/Wind Harmer
0.838
970453AG2-297 GEN
Solar/Wind Harmer
1.167
970997AG2-616 GEN
Solar/Wind Harmer
4.797
971189AH1-054 GEN
Solar/Wind Harmer
0.365
971667AH1-334 GEN
Solar/Wind Harmer
0.796
219221BRL12CT1
50/50
5.636
219222BRL12CT2
50/50
5.636
219223BRL12CT3
50/50
5.636
219224BRL12CT4
50/50
5.636
963711AG1-223 GEN
Solar/Wind Harmer
0.384
964001AG1-254 GEN
Solar/Wind Harmer
3.763
972141AH1-641 GEN
Solar/Wind Harmer
1.439
972233AH1-701 GEN
50/50
2.603
972251AH1-710 GEN
Adder
13.191
230404GT1-CC
50/50
1.604
230405GT2-CC
50/50
1.614
230406ST-CC
50/50
2.381
971525AH1-260 GEN
50/50
31.549
219229EAGLE PT ST
50/50
0.365
219230EAGLE PT CT1
50/50
0.721
219231EAGLE PT CT2
50/50
0.721
219235Y2-105
50/50
0.261
230422AE1-104_GEN1
Solar/Wind Harmer
14.251
230425AE1-104_GEN2
Solar/Wind Harmer
14.251
219912AD2-042 GEN
Solar/Wind Harmer
0.622
219914AD2-027 C
Solar/Wind Harmer
0.469
207500AE2-000G1
Solar/Wind Harmer
9.418
207497AE2-000G2
Solar/Wind Harmer
9.418
207507AE2-000G3
Solar/Wind Harmer
9.418
207487AE2-000G4
Solar/Wind Harmer
9.418
CBM NorthLTFEXP_CBM-N->PJM
CBM
6.482
G-007ALTFEXP_G-007A->PJM
CMTX
8.874
VTFLTFEXP_VFT->PJM
CMTX
17.76
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.313
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.188
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
1.35
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.29
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.903
MDUPJM->LTFIMP_MDU
CLTF
0

Details for WANEETA2-N PHILA 230.0 kV Ckt 1 line l/o PECO_P2-2_CHI230B1_SRT-A/* $ DELCO $ PECO_P2-2_CHI230B1 $ B


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
WANEETA2-N PHILA 230.0 kV Ckt 1 line
Contingency Name:
PECO_P2-2_CHI230B1_SRT-A/* $ DELCO $ PECO_P2-2_CHI230B1 $ B
Contingency Type:Bus
DC|AC:AC
Final Cycle Loading:101.02 %
Rating:621.0 MVA
Rating Type:B
MVA to Mitigate:627.32
MW Contribution:
31.55
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
20628028LAKEHURS
Adder
0.272
20636028O CRK C1
Adder
2.113
20636128O CRK C2
Adder
1.927
20714528FRN_Y2-051
Solar/Wind Harmer
0.076
20714828MDF_W3-079
Solar/Wind Harmer
0.079
20714928UPF_X1-085
Solar/Wind Harmer
0.126
20715028HAN_X4-015
Solar/Wind Harmer
0.107
20715728PEM_W1-119
Solar/Wind Harmer
0.185
20715828PEM_W1-120
Solar/Wind Harmer
0.185
20716028EGP_W2-019
Solar/Wind Harmer
0.167
20716428NHV_W2-082
Solar/Wind Harmer
0.636
20717128DIX_Z2-102
Solar/Wind Harmer
0.464
20720728JCB_W1-129
Solar/Wind Harmer
0.107
20720828JCB_W4-025
Solar/Wind Harmer
0.163
213400COVANTA DELA
50/50
0.488
213535CROYDN11
50/50
6.488
213536CROYDN12
50/50
1.431
213537CROYDN21
50/50
0.355
213538CROYDN22
50/50
0.355
213539CROYDN31
50/50
0.355
213540CROYDN32
50/50
0.348
213541CROYDN41
50/50
0.355
213542CROYDN42
50/50
0.355
213611FALLS1-3
50/50
1.819
213611FALLS1-3
50/50
1.819
213611FALLS1-3
50/50
1.819
213616FORDACT1
50/50
1.287
213617FORDACT2
50/50
1.287
213618FORDAST1
50/50
1.79
213619FORDBCT1
50/50
1.293
213620FORDBCT2
50/50
1.293
213621FORDBST1
50/50
1.794
213918RICHMD91
50/50
0.588
213919RICHMD92
50/50
0.588
214067T20SOLAR
Solar/Wind Harmer
0.122
231917EM10
Adder
0.61
231918WEST 1
Adder
0.81
231919CHRIST1
Adder
1.094
231920CHRIST2
Adder
1.069
217197RE CRAN C
Solar/Wind Harmer
0.126
218438BLK ROCK C
Solar/Wind Harmer
0.032
218660EHAMPSOLAR C
Solar/Wind Harmer
0.094
219114HARTZY_C
Solar/Wind Harmer
0.34
219124CAMDEN_STG
50/50
0.592
219126CAMDEN_CTG
50/50
0.727
219137THOSOLAR C
Solar/Wind Harmer
0.804
219236SOUTHERNHQ C
Solar/Wind Harmer
0.048
219272CLEANLIGHT C
Solar/Wind Harmer
0.104
219276PARKLANDSO C
Solar/Wind Harmer
0.15
219286CAMD CO RR
50/50
0.217
219287REEVESEAST C
Solar/Wind Harmer
0.709
219291REEVESSOUT C
Solar/Wind Harmer
0.032
219348LDSOLAR C
Solar/Wind Harmer
0.356
219607WPEMNERT C
Solar/Wind Harmer
0.249
219610FLORENCE C
Solar/Wind Harmer
0.824
219612MATRIX C
Solar/Wind Harmer
0.043
219615MILLCREEK C
Solar/Wind Harmer
0.154
219766PARADISE C
Solar/Wind Harmer
0.235
227927V4-067C
Solar/Wind Harmer
0.082
228200CARL#1CT
50/50
3.294
228201CARL#2CT
50/50
3.464
228206SHRMN CT
Adder
7.276
228251CARLLS#4
50/50
0.318
228260V4-054C
Solar/Wind Harmer
0.487
228307PCLP GT
50/50
7.178
228400MICK 1CT
50/50
7.403
228711V2-041C
Solar/Wind Harmer
0.261
228728W1-130C
Solar/Wind Harmer
0.318
228729W2-030 C
Solar/Wind Harmer
0.242
228732V1-021 C
Adder
0.08
230415AB2-049 C
Solar/Wind Harmer
0.094
207459AE1-142 C O1
Solar/Wind Harmer
0.3
219267WHEELBRDEPTF
50/50
0.101
219727YARDVSOLFA C
Solar/Wind Harmer
0.348
219907AC1-030 C
Solar/Wind Harmer
0.1
228754AB1-001 C
Solar/Wind Harmer
0.058
228351V2-046C
Solar/Wind Harmer
1.041
207522AF2-254 C
Solar/Wind Harmer
0.51
207445AB1-138_GEN
Solar/Wind Harmer
0.165
230433AD2-135 GEN
Solar/Wind Harmer
0.049
230430AE1-229_GEN
Solar/Wind Harmer
14.297
219686LUMSOLAR_N C
Solar/Wind Harmer
0.107
219688LUMSOLAR_S C
Solar/Wind Harmer
0.111
219904AC1-010 C
Solar/Wind Harmer
0.282
219906AC1-017 C
Solar/Wind Harmer
0.144
219623KINSLEYBEA C
Solar/Wind Harmer
0.301
219258KINSLEYDEP C
Solar/Wind Harmer
0.23
219304NAMERICA C
Solar/Wind Harmer
0.185
219921AF1-264
Solar/Wind Harmer
0.105
219924AG1-130 C
50/50
0.264
230511AF1-262
Solar/Wind Harmer
0.091
230434AG1-499 GEN
Solar/Wind Harmer
0.31
230407AD2-065 C
Solar/Wind Harmer
0.065
959561AF2-247 GEN
Solar/Wind Harmer
0.241
963391AG1-188 GEN
Solar/Wind Harmer
1.108
963401AG1-189 GEN
Solar/Wind Harmer
0.675
970025AG2-016 GEN
Solar/Wind Harmer
0.838
970453AG2-297 GEN
Solar/Wind Harmer
1.167
970997AG2-616 GEN
Solar/Wind Harmer
4.797
971189AH1-054 GEN
Solar/Wind Harmer
0.365
971667AH1-334 GEN
Solar/Wind Harmer
0.796
219221BRL12CT1
50/50
5.636
219222BRL12CT2
50/50
5.636
219223BRL12CT3
50/50
5.636
219224BRL12CT4
50/50
5.636
963711AG1-223 GEN
Solar/Wind Harmer
0.384
964001AG1-254 GEN
Solar/Wind Harmer
3.763
972141AH1-641 GEN
Solar/Wind Harmer
1.439
972233AH1-701 GEN
50/50
2.603
972251AH1-710 GEN
Adder
13.191
230404GT1-CC
50/50
1.604
230405GT2-CC
50/50
1.614
230406ST-CC
50/50
2.381
971525AH1-260 GEN
50/50
31.549
219229EAGLE PT ST
50/50
0.365
219230EAGLE PT CT1
50/50
0.721
219231EAGLE PT CT2
50/50
0.721
219235Y2-105
50/50
0.261
230422AE1-104_GEN1
Solar/Wind Harmer
14.251
230425AE1-104_GEN2
Solar/Wind Harmer
14.251
219912AD2-042 GEN
Solar/Wind Harmer
0.622
219914AD2-027 C
Solar/Wind Harmer
0.469
207500AE2-000G1
Solar/Wind Harmer
9.418
207497AE2-000G2
Solar/Wind Harmer
9.418
207507AE2-000G3
Solar/Wind Harmer
9.418
207487AE2-000G4
Solar/Wind Harmer
9.418
CBM NorthLTFEXP_CBM-N->PJM
CBM
6.482
G-007ALTFEXP_G-007A->PJM
CMTX
8.874
VTFLTFEXP_VFT->PJM
CMTX
17.76
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.313
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.188
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
1.35
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.29
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.903
MDUPJM->LTFIMP_MDU
CLTF
0

Details for WANEETA2-N PHILA 230.0 kV Ckt 1 line l/o PECO_P4_CHICH195_SRT-A/* $ DELCO $ PECO_P4_CHICH195 $ STBK


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
WANEETA2-N PHILA 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_CHICH195_SRT-A/* $ DELCO $ PECO_P4_CHICH195 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.01 %
Rating:621.0 MVA
Rating Type:B
MVA to Mitigate:627.26
MW Contribution:
31.55
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
20628028LAKEHURS
Adder
0.272
20636028O CRK C1
Adder
2.113
20636128O CRK C2
Adder
1.927
20714528FRN_Y2-051
Solar/Wind Harmer
0.076
20714828MDF_W3-079
Solar/Wind Harmer
0.079
20714928UPF_X1-085
Solar/Wind Harmer
0.126
20715028HAN_X4-015
Solar/Wind Harmer
0.107
20715728PEM_W1-119
Solar/Wind Harmer
0.185
20715828PEM_W1-120
Solar/Wind Harmer
0.185
20716028EGP_W2-019
Solar/Wind Harmer
0.167
20716428NHV_W2-082
Solar/Wind Harmer
0.636
20717128DIX_Z2-102
Solar/Wind Harmer
0.464
20720728JCB_W1-129
Solar/Wind Harmer
0.107
20720828JCB_W4-025
Solar/Wind Harmer
0.163
213400COVANTA DELA
50/50
0.488
213535CROYDN11
50/50
6.488
213536CROYDN12
50/50
1.431
213537CROYDN21
50/50
0.355
213538CROYDN22
50/50
0.355
213539CROYDN31
50/50
0.355
213540CROYDN32
50/50
0.348
213541CROYDN41
50/50
0.355
213542CROYDN42
50/50
0.355
213611FALLS1-3
50/50
1.819
213611FALLS1-3
50/50
1.819
213611FALLS1-3
50/50
1.819
213616FORDACT1
50/50
1.287
213617FORDACT2
50/50
1.287
213618FORDAST1
50/50
1.79
213619FORDBCT1
50/50
1.293
213620FORDBCT2
50/50
1.293
213621FORDBST1
50/50
1.794
213918RICHMD91
50/50
0.588
213919RICHMD92
50/50
0.588
214067T20SOLAR
Solar/Wind Harmer
0.122
231917EM10
Adder
0.61
231918WEST 1
Adder
0.81
231919CHRIST1
Adder
1.094
231920CHRIST2
Adder
1.069
217197RE CRAN C
Solar/Wind Harmer
0.126
218438BLK ROCK C
Solar/Wind Harmer
0.032
218660EHAMPSOLAR C
Solar/Wind Harmer
0.094
219114HARTZY_C
Solar/Wind Harmer
0.34
219124CAMDEN_STG
50/50
0.592
219126CAMDEN_CTG
50/50
0.727
219137THOSOLAR C
Solar/Wind Harmer
0.804
219236SOUTHERNHQ C
Solar/Wind Harmer
0.048
219272CLEANLIGHT C
Solar/Wind Harmer
0.104
219276PARKLANDSO C
Solar/Wind Harmer
0.15
219286CAMD CO RR
50/50
0.217
219287REEVESEAST C
Solar/Wind Harmer
0.709
219291REEVESSOUT C
Solar/Wind Harmer
0.032
219348LDSOLAR C
Solar/Wind Harmer
0.356
219607WPEMNERT C
Solar/Wind Harmer
0.249
219610FLORENCE C
Solar/Wind Harmer
0.824
219612MATRIX C
Solar/Wind Harmer
0.043
219615MILLCREEK C
Solar/Wind Harmer
0.154
219766PARADISE C
Solar/Wind Harmer
0.235
227927V4-067C
Solar/Wind Harmer
0.082
228200CARL#1CT
50/50
3.294
228201CARL#2CT
50/50
3.464
228206SHRMN CT
Adder
7.276
228251CARLLS#4
50/50
0.318
228260V4-054C
Solar/Wind Harmer
0.487
228307PCLP GT
50/50
7.178
228400MICK 1CT
50/50
7.403
228711V2-041C
Solar/Wind Harmer
0.261
228728W1-130C
Solar/Wind Harmer
0.318
228729W2-030 C
Solar/Wind Harmer
0.242
228732V1-021 C
Adder
0.08
230415AB2-049 C
Solar/Wind Harmer
0.094
207459AE1-142 C O1
Solar/Wind Harmer
0.3
219267WHEELBRDEPTF
50/50
0.101
219727YARDVSOLFA C
Solar/Wind Harmer
0.348
219907AC1-030 C
Solar/Wind Harmer
0.1
228754AB1-001 C
Solar/Wind Harmer
0.058
228351V2-046C
Solar/Wind Harmer
1.041
207522AF2-254 C
Solar/Wind Harmer
0.51
207445AB1-138_GEN
Solar/Wind Harmer
0.165
230433AD2-135 GEN
Solar/Wind Harmer
0.049
230430AE1-229_GEN
Solar/Wind Harmer
14.297
219686LUMSOLAR_N C
Solar/Wind Harmer
0.107
219688LUMSOLAR_S C
Solar/Wind Harmer
0.111
219904AC1-010 C
Solar/Wind Harmer
0.282
219906AC1-017 C
Solar/Wind Harmer
0.144
219623KINSLEYBEA C
Solar/Wind Harmer
0.301
219258KINSLEYDEP C
Solar/Wind Harmer
0.23
219304NAMERICA C
Solar/Wind Harmer
0.185
219921AF1-264
Solar/Wind Harmer
0.105
219924AG1-130 C
50/50
0.264
230511AF1-262
Solar/Wind Harmer
0.091
230434AG1-499 GEN
Solar/Wind Harmer
0.31
230407AD2-065 C
Solar/Wind Harmer
0.065
959561AF2-247 GEN
Solar/Wind Harmer
0.241
963391AG1-188 GEN
Solar/Wind Harmer
1.108
963401AG1-189 GEN
Solar/Wind Harmer
0.675
970025AG2-016 GEN
Solar/Wind Harmer
0.838
970453AG2-297 GEN
Solar/Wind Harmer
1.167
970997AG2-616 GEN
Solar/Wind Harmer
4.797
971189AH1-054 GEN
Solar/Wind Harmer
0.365
971667AH1-334 GEN
Solar/Wind Harmer
0.796
219221BRL12CT1
50/50
5.636
219222BRL12CT2
50/50
5.636
219223BRL12CT3
50/50
5.636
219224BRL12CT4
50/50
5.636
963711AG1-223 GEN
Solar/Wind Harmer
0.384
964001AG1-254 GEN
Solar/Wind Harmer
3.763
972141AH1-641 GEN
Solar/Wind Harmer
1.439
972233AH1-701 GEN
50/50
2.603
972251AH1-710 GEN
Adder
13.191
230404GT1-CC
50/50
1.604
230405GT2-CC
50/50
1.614
230406ST-CC
50/50
2.381
971525AH1-260 GEN
50/50
31.549
219229EAGLE PT ST
50/50
0.365
219230EAGLE PT CT1
50/50
0.721
219231EAGLE PT CT2
50/50
0.721
219235Y2-105
50/50
0.261
230422AE1-104_GEN1
Solar/Wind Harmer
14.251
230425AE1-104_GEN2
Solar/Wind Harmer
14.251
219912AD2-042 GEN
Solar/Wind Harmer
0.622
219914AD2-027 C
Solar/Wind Harmer
0.469
207500AE2-000G1
Solar/Wind Harmer
9.418
207497AE2-000G2
Solar/Wind Harmer
9.418
207507AE2-000G3
Solar/Wind Harmer
9.418
207487AE2-000G4
Solar/Wind Harmer
9.418
CBM NorthLTFEXP_CBM-N->PJM
CBM
6.482
G-007ALTFEXP_G-007A->PJM
CMTX
8.874
VTFLTFEXP_VFT->PJM
CMTX
17.76
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.313
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.188
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
1.35
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.29
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.903
MDUPJM->LTFIMP_MDU
CLTF
0

Details for WANEETA2-N PHILA 230.0 kV Ckt 1 line l/o PECO_P4_CHICH435_SRT-A/* $ DELCO $ PECO_P4_CHICH435 $ STBK


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
WANEETA2-N PHILA 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_CHICH435_SRT-A/* $ DELCO $ PECO_P4_CHICH435 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.01 %
Rating:621.0 MVA
Rating Type:B
MVA to Mitigate:627.25
MW Contribution:
31.55
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
20628028LAKEHURS
Adder
0.272
20636028O CRK C1
Adder
2.113
20636128O CRK C2
Adder
1.927
20714528FRN_Y2-051
Solar/Wind Harmer
0.076
20714828MDF_W3-079
Solar/Wind Harmer
0.079
20714928UPF_X1-085
Solar/Wind Harmer
0.126
20715028HAN_X4-015
Solar/Wind Harmer
0.107
20715728PEM_W1-119
Solar/Wind Harmer
0.185
20715828PEM_W1-120
Solar/Wind Harmer
0.185
20716028EGP_W2-019
Solar/Wind Harmer
0.167
20716428NHV_W2-082
Solar/Wind Harmer
0.636
20717128DIX_Z2-102
Solar/Wind Harmer
0.464
20720728JCB_W1-129
Solar/Wind Harmer
0.107
20720828JCB_W4-025
Solar/Wind Harmer
0.163
213400COVANTA DELA
50/50
0.488
213535CROYDN11
50/50
6.488
213536CROYDN12
50/50
1.431
213537CROYDN21
50/50
0.355
213538CROYDN22
50/50
0.355
213539CROYDN31
50/50
0.355
213540CROYDN32
50/50
0.348
213541CROYDN41
50/50
0.355
213542CROYDN42
50/50
0.355
213611FALLS1-3
50/50
1.819
213611FALLS1-3
50/50
1.819
213611FALLS1-3
50/50
1.819
213616FORDACT1
50/50
1.287
213617FORDACT2
50/50
1.287
213618FORDAST1
50/50
1.79
213619FORDBCT1
50/50
1.293
213620FORDBCT2
50/50
1.293
213621FORDBST1
50/50
1.794
213918RICHMD91
50/50
0.588
213919RICHMD92
50/50
0.588
214067T20SOLAR
Solar/Wind Harmer
0.122
231917EM10
Adder
0.61
231918WEST 1
Adder
0.81
231919CHRIST1
Adder
1.094
231920CHRIST2
Adder
1.069
217197RE CRAN C
Solar/Wind Harmer
0.126
218438BLK ROCK C
Solar/Wind Harmer
0.032
218660EHAMPSOLAR C
Solar/Wind Harmer
0.094
219114HARTZY_C
Solar/Wind Harmer
0.34
219124CAMDEN_STG
50/50
0.592
219126CAMDEN_CTG
50/50
0.727
219137THOSOLAR C
Solar/Wind Harmer
0.804
219236SOUTHERNHQ C
Solar/Wind Harmer
0.048
219272CLEANLIGHT C
Solar/Wind Harmer
0.104
219276PARKLANDSO C
Solar/Wind Harmer
0.15
219286CAMD CO RR
50/50
0.217
219287REEVESEAST C
Solar/Wind Harmer
0.709
219291REEVESSOUT C
Solar/Wind Harmer
0.032
219348LDSOLAR C
Solar/Wind Harmer
0.356
219607WPEMNERT C
Solar/Wind Harmer
0.249
219610FLORENCE C
Solar/Wind Harmer
0.824
219612MATRIX C
Solar/Wind Harmer
0.043
219615MILLCREEK C
Solar/Wind Harmer
0.154
219766PARADISE C
Solar/Wind Harmer
0.235
227927V4-067C
Solar/Wind Harmer
0.082
228200CARL#1CT
50/50
3.295
228201CARL#2CT
50/50
3.464
228206SHRMN CT
Adder
7.276
228251CARLLS#4
50/50
0.318
228260V4-054C
Solar/Wind Harmer
0.487
228307PCLP GT
50/50
7.178
228400MICK 1CT
50/50
7.403
228711V2-041C
Solar/Wind Harmer
0.261
228728W1-130C
Solar/Wind Harmer
0.318
228729W2-030 C
Solar/Wind Harmer
0.242
228732V1-021 C
Adder
0.08
230415AB2-049 C
Solar/Wind Harmer
0.094
207459AE1-142 C O1
Solar/Wind Harmer
0.3
219267WHEELBRDEPTF
50/50
0.101
219727YARDVSOLFA C
Solar/Wind Harmer
0.348
219907AC1-030 C
Solar/Wind Harmer
0.1
228754AB1-001 C
Solar/Wind Harmer
0.058
228351V2-046C
Solar/Wind Harmer
1.041
207522AF2-254 C
Solar/Wind Harmer
0.51
207445AB1-138_GEN
Solar/Wind Harmer
0.165
230433AD2-135 GEN
Solar/Wind Harmer
0.049
230430AE1-229_GEN
Solar/Wind Harmer
14.297
219686LUMSOLAR_N C
Solar/Wind Harmer
0.107
219688LUMSOLAR_S C
Solar/Wind Harmer
0.111
219904AC1-010 C
Solar/Wind Harmer
0.282
219906AC1-017 C
Solar/Wind Harmer
0.144
219623KINSLEYBEA C
Solar/Wind Harmer
0.301
219258KINSLEYDEP C
Solar/Wind Harmer
0.23
219304NAMERICA C
Solar/Wind Harmer
0.185
219921AF1-264
Solar/Wind Harmer
0.105
219924AG1-130 C
50/50
0.264
230511AF1-262
Solar/Wind Harmer
0.091
230434AG1-499 GEN
Solar/Wind Harmer
0.31
230407AD2-065 C
Solar/Wind Harmer
0.065
959561AF2-247 GEN
Solar/Wind Harmer
0.241
963391AG1-188 GEN
Solar/Wind Harmer
1.108
963401AG1-189 GEN
Solar/Wind Harmer
0.675
970025AG2-016 GEN
Solar/Wind Harmer
0.838
970453AG2-297 GEN
Solar/Wind Harmer
1.167
970997AG2-616 GEN
Solar/Wind Harmer
4.797
971189AH1-054 GEN
Solar/Wind Harmer
0.365
971667AH1-334 GEN
Solar/Wind Harmer
0.796
219221BRL12CT1
50/50
5.636
219222BRL12CT2
50/50
5.636
219223BRL12CT3
50/50
5.636
219224BRL12CT4
50/50
5.636
963711AG1-223 GEN
Solar/Wind Harmer
0.384
964001AG1-254 GEN
Solar/Wind Harmer
3.763
972141AH1-641 GEN
Solar/Wind Harmer
1.439
972233AH1-701 GEN
50/50
2.603
972251AH1-710 GEN
Adder
13.191
230404GT1-CC
50/50
1.604
230405GT2-CC
50/50
1.614
230406ST-CC
50/50
2.381
971525AH1-260 GEN
50/50
31.55
219229EAGLE PT ST
50/50
0.365
219230EAGLE PT CT1
50/50
0.721
219231EAGLE PT CT2
50/50
0.721
219235Y2-105
50/50
0.261
230422AE1-104_GEN1
Solar/Wind Harmer
14.252
230425AE1-104_GEN2
Solar/Wind Harmer
14.252
219912AD2-042 GEN
Solar/Wind Harmer
0.622
219914AD2-027 C
Solar/Wind Harmer
0.469
207500AE2-000G1
Solar/Wind Harmer
9.418
207497AE2-000G2
Solar/Wind Harmer
9.418
207507AE2-000G3
Solar/Wind Harmer
9.418
207487AE2-000G4
Solar/Wind Harmer
9.418
CBM NorthLTFEXP_CBM-N->PJM
CBM
6.482
G-007ALTFEXP_G-007A->PJM
CMTX
8.875
VTFLTFEXP_VFT->PJM
CMTX
17.76
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.313
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.188
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
1.35
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.29
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
0.903
MDUPJM->LTFIMP_MDU
CLTF
0
CONTINGENCY 'PECO_P4_CHICH045_SRT-A
 DISCONNECT BUS 213489   /*CHICHST1     230.0
 DISCONNECT BUS 213627   /*FOULK8       230.0
END
CONTINGENCY 'PECO_P2-2_CHI230B1_SRT-A
 DISCONNECT BUS 213489   /*CHICHST1     230.0
END
CONTINGENCY 'PECO_P4_CHICH195_SRT-A
 DISCONNECT BUS 213489   /*CHICHST1     230.0
 DISCONNECT BUS 214203   /*CHICHST1     138.0
 DISCONNECT BUS 214340   /*CHI9AB HS LD 230.0
END
CONTINGENCY 'PECO_P4_CHICH435_SRT-A
 DISCONNECT BUS 213489   /*CHICHST1     230.0
 DISCONNECT BUS 213750   /*LINWOOD43    230.0
 DISCONNECT BUS 214221   /*CHIREACT_43  230.0
END
214010 to 213817 ckt 1

Winter Peak Analysis

The New Service Request AH1-260 was evaluated as a 300.0 MW (300.0 MW Capacity) injection in the AEC area.

AH1-260 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 300.0 MW (300.0 MW under study).

Note: The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for single or N-1 contingencies and multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

The following flowgates remain after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
GD2PJM
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
PJM500_PS_P1-2_5015_SRT-A
SingleAC106.77 %1150.0B1227.82
45.56
GD2PJM
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
PJM500_PS_P2-3_HOPC_3-4_SRT-A
BreakerAC106.77 %1150.0B1227.82
45.56
GD2PJM
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
DPL_P4_2_REDLION-HOPE AT50_SRT-A
BreakerAC105.47 %1150.0B1212.88
44.39

Details for HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line l/o PJM500_PS_P1-2_5015_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PJM
Facility Description:
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
Contingency Name:
PJM500_PS_P1-2_5015_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:106.77 %
Rating:1150.0 MVA
Rating Type:B
MVA to Mitigate:1227.82
MW Contribution:
45.56
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:PJM
Facility Description:
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
Contingency Name:
PJM500_PS_P1-2_5015_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:101.32 %
Rating:1150.0 MVA
Rating Type:B
MVA to Mitigate:1165.21
MW Contribution:
44.87
Bus #Bus NameTypeMW Contribution
20636028O CRK C1
50/50
4.868
20636128O CRK C2
50/50
4.647
20676328BVR_Y1-020
Solar/Wind Harmer
0
20740028PL_AA1-060
50/50
0.208
207439AE1-081 C O1
Solar/Wind Harmer
0
217206BARNGR HS C
Solar/Wind Harmer
0
217208PARK ELE C
Solar/Wind Harmer
0
217209CENTRL HS C
Solar/Wind Harmer
0
217211CAMDEN ST C
Solar/Wind Harmer
0
232404W1-003 C
Solar/Wind Helper
0.249
232408W1-005 C
Solar/Wind Helper
0.249
232410W1-006 C
Solar/Wind Helper
0.249
232417X3-008 C
Solar/Wind Helper
0.231
232426Y1-080 FULL
Solar/Wind Helper
0.04
232428Y3-058 C
Solar/Wind Helper
0.184
217081WEATEXAS C
Solar/Wind Harmer
0
218428ETC SOLAR C
Solar/Wind Harmer
0
218438BLK ROCK C
Solar/Wind Harmer
0
218449LINSOLAR C
Solar/Wind Harmer
0
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219249CENTRALDIV C
Solar/Wind Harmer
0
219612MATRIX C
Solar/Wind Harmer
0
219620RIDERU C
Solar/Wind Harmer
0
219817TRENTONSOL C
Solar/Wind Harmer
0
228200CARL#1CT
50/50
4.638
228201CARL#2CT
50/50
4.876
228202CUMB CT
50/50
15.095
228203P06
50/50
16.472
228206SHRMN CT
50/50
14.846
228251CARLLS#4
50/50
0.716
228307PCLP GT
50/50
7.195
228400MICK 1CT
50/50
6.432
228727W2-039G
50/50
9.757
228732V1-021 C
50/50
0.302
232406W1-004 FULL
Solar/Wind Helper
0.249
232436AB1-176 C
Solar/Wind Helper
0.041
232424Y1-079 C
Solar/Wind Helper
0.104
218524CNTRALGAS1 C
Solar/Wind Harmer
0
218526CNTRALGAS2 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Helper
0.249
233940AF2-379 C
Solar/Wind Helper
0.048
219727YARDVSOLFA C
Solar/Wind Harmer
0
228717S121
50/50
9.668
233944AB2-135 GEN
Solar/Wind Helper
0.685
233946AB2-136 GEN
Solar/Wind Helper
0.599
233994AC2-023 GEN
Solar/Wind Helper
0.56
233982AB2-133 GEN
Solar/Wind Helper
0.571
233915AB1-141 GEN
Solar/Wind Helper
0.198
233918AB1-142 GEN
Solar/Wind Helper
0.198
233930AB2-032 GEN
Solar/Wind Helper
0.2
233987AB2-037 GEN
Solar/Wind Helper
2.069
233933AB2-153 GEN
Solar/Wind Helper
0.2
233955AB2-172 GEN
Solar/Wind Helper
0.578
233935AB2-179 C
Solar/Wind Helper
0.426
234015AF2-250 C
Solar/Wind Helper
0.024
234036AF2-325 C
Solar/Wind Helper
0.117
207522AF2-254 C
Solar/Wind Harmer
0.053
207528AF2-192 GEN
Solar/Wind Harmer
0.023
233923SMA
Solar/Wind Helper
0.801
230430AE1-229_GEN
Solar/Wind Harmer
1.058
219623KINSLEYBEA C
Solar/Wind Harmer
0
233964AF2-378 GEN
Solar/Wind Helper
0.031
200036SALEM-G1
50/50
16.68
207511W3-106 GEN
Solar/Wind Harmer
0
230407AD2-065 C
Solar/Wind Harmer
0
232432Z2-076 GEN
Solar/Wind Helper
0.034
232434Z2-077 GEN
Solar/Wind Helper
0.064
233996TM1833_GEN
Solar/Wind Helper
0.218
233997TMININ_4.2
Solar/Wind Helper
0.218
233998TM1NIN_3.36
Solar/Wind Helper
0.218
963401AG1-189 GEN
Solar/Wind Harmer
0.065
970025AG2-016 GEN
Solar/Wind Harmer
0.107
970453AG2-297 GEN
Solar/Wind Harmer
0.156
970997AG2-616 GEN
Solar/Wind Harmer
0.355
971007AG2-625 GEN
Solar/Wind Harmer
0.05
971009AG2-626 GEN
Solar/Wind Harmer
0.032
971189AH1-054 GEN
Solar/Wind Harmer
0.043
971519AH1-257 GEN
Solar/Wind Harmer
0.048
971521AH1-258 GEN
Solar/Wind Harmer
0.086
971667AH1-334 GEN
Solar/Wind Harmer
0.1
219918AC2-009 C
Solar/Wind Harmer
0
972141AH1-641 GEN
Solar/Wind Harmer
0.107
972251AH1-710 GEN
50/50
65.185
200037SALEM-G2
50/50
16.541
200039HOPE CG1
50/50
17.779
945731AF1-238 GEN
50/50
3.1
945741AF1-239 GEN
50/50
1.86
971525AH1-260 GEN
50/50
45.565
957251AF2-019 GEN
50/50
1.269
957311AF2-025 GEN
50/50
1.199
233950AC2-186 GEN
Solar/Wind Helper
0.131
233952AC2-187 GEN
Solar/Wind Helper
0.263
233954AC2-188 GEN
Solar/Wind Helper
0.263
230422AE1-104_GEN1
Solar/Wind Harmer
32.04
230425AE1-104_GEN2
Solar/Wind Harmer
32.04
232422X3-066 FULL
Solar/Wind Helper
0.062
207500AE2-000G1
Solar/Wind Harmer
21.667
207497AE2-000G2
Solar/Wind Harmer
21.667
207507AE2-000G3
Solar/Wind Harmer
21.667
207487AE2-000G4
Solar/Wind Harmer
21.667
CBM NorthLTFEXP_CBM-N->PJM
CBM
21.633
G-007ALTFEXP_G-007A->PJM
CMTX
19.216
VFTLTFEXP_VFT->PJM
CMTX
44.501
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.832
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.496
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
3.325
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.711
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.214
MDUPJM->LTFIMP_MDU
CLTF
0

Details for HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line l/o PJM500_PS_P2-3_HOPC_3-4_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PJM
Facility Description:
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
Contingency Name:
PJM500_PS_P2-3_HOPC_3-4_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:106.77 %
Rating:1150.0 MVA
Rating Type:B
MVA to Mitigate:1227.82
MW Contribution:
45.56
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:PJM
Facility Description:
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
Contingency Name:
PJM500_PS_P2-3_HOPC_3-4_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.32 %
Rating:1150.0 MVA
Rating Type:B
MVA to Mitigate:1165.2
MW Contribution:
44.87
Bus #Bus NameTypeMW Contribution
20636028O CRK C1
50/50
4.868
20636128O CRK C2
50/50
4.647
20676328BVR_Y1-020
Solar/Wind Harmer
0
20740028PL_AA1-060
50/50
0.208
207439AE1-081 C O1
Solar/Wind Harmer
0
217206BARNGR HS C
Solar/Wind Harmer
0
217208PARK ELE C
Solar/Wind Harmer
0
217209CENTRL HS C
Solar/Wind Harmer
0
217211CAMDEN ST C
Solar/Wind Harmer
0
232404W1-003 C
Solar/Wind Helper
0.249
232408W1-005 C
Solar/Wind Helper
0.249
232410W1-006 C
Solar/Wind Helper
0.249
232417X3-008 C
Solar/Wind Helper
0.231
232426Y1-080 FULL
Solar/Wind Helper
0.04
232428Y3-058 C
Solar/Wind Helper
0.184
217081WEATEXAS C
Solar/Wind Harmer
0
218428ETC SOLAR C
Solar/Wind Harmer
0
218438BLK ROCK C
Solar/Wind Harmer
0
218449LINSOLAR C
Solar/Wind Harmer
0
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219249CENTRALDIV C
Solar/Wind Harmer
0
219612MATRIX C
Solar/Wind Harmer
0
219620RIDERU C
Solar/Wind Harmer
0
219817TRENTONSOL C
Solar/Wind Harmer
0
228200CARL#1CT
50/50
4.638
228201CARL#2CT
50/50
4.876
228202CUMB CT
50/50
15.095
228203P06
50/50
16.472
228206SHRMN CT
50/50
14.846
228251CARLLS#4
50/50
0.716
228307PCLP GT
50/50
7.195
228400MICK 1CT
50/50
6.432
228727W2-039G
50/50
9.757
228732V1-021 C
50/50
0.302
232406W1-004 FULL
Solar/Wind Helper
0.249
232436AB1-176 C
Solar/Wind Helper
0.041
232424Y1-079 C
Solar/Wind Helper
0.104
218524CNTRALGAS1 C
Solar/Wind Harmer
0
218526CNTRALGAS2 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Helper
0.249
233940AF2-379 C
Solar/Wind Helper
0.048
219727YARDVSOLFA C
Solar/Wind Harmer
0
228717S121
50/50
9.668
233944AB2-135 GEN
Solar/Wind Helper
0.685
233946AB2-136 GEN
Solar/Wind Helper
0.599
233994AC2-023 GEN
Solar/Wind Helper
0.56
233982AB2-133 GEN
Solar/Wind Helper
0.571
233915AB1-141 GEN
Solar/Wind Helper
0.198
233918AB1-142 GEN
Solar/Wind Helper
0.198
233930AB2-032 GEN
Solar/Wind Helper
0.2
233987AB2-037 GEN
Solar/Wind Helper
2.069
233933AB2-153 GEN
Solar/Wind Helper
0.2
233955AB2-172 GEN
Solar/Wind Helper
0.578
233935AB2-179 C
Solar/Wind Helper
0.426
234015AF2-250 C
Solar/Wind Helper
0.024
234036AF2-325 C
Solar/Wind Helper
0.117
207522AF2-254 C
Solar/Wind Harmer
0.053
207528AF2-192 GEN
Solar/Wind Harmer
0.023
233923SMA
Solar/Wind Helper
0.801
230430AE1-229_GEN
Solar/Wind Harmer
1.058
219623KINSLEYBEA C
Solar/Wind Harmer
0
233964AF2-378 GEN
Solar/Wind Helper
0.031
200036SALEM-G1
50/50
16.68
207511W3-106 GEN
Solar/Wind Harmer
0
230407AD2-065 C
Solar/Wind Harmer
0
232432Z2-076 GEN
Solar/Wind Helper
0.034
232434Z2-077 GEN
Solar/Wind Helper
0.064
233996TM1833_GEN
Solar/Wind Helper
0.218
233997TMININ_4.2
Solar/Wind Helper
0.218
233998TM1NIN_3.36
Solar/Wind Helper
0.218
963401AG1-189 GEN
Solar/Wind Harmer
0.065
970025AG2-016 GEN
Solar/Wind Harmer
0.107
970453AG2-297 GEN
Solar/Wind Harmer
0.156
970997AG2-616 GEN
Solar/Wind Harmer
0.355
971007AG2-625 GEN
Solar/Wind Harmer
0.05
971009AG2-626 GEN
Solar/Wind Harmer
0.032
971189AH1-054 GEN
Solar/Wind Harmer
0.043
971519AH1-257 GEN
Solar/Wind Harmer
0.048
971521AH1-258 GEN
Solar/Wind Harmer
0.086
971667AH1-334 GEN
Solar/Wind Harmer
0.1
219918AC2-009 C
Solar/Wind Harmer
0
972141AH1-641 GEN
Solar/Wind Harmer
0.107
972251AH1-710 GEN
50/50
65.185
200037SALEM-G2
50/50
16.541
200039HOPE CG1
50/50
17.779
945731AF1-238 GEN
50/50
3.1
945741AF1-239 GEN
50/50
1.86
971525AH1-260 GEN
50/50
45.565
957251AF2-019 GEN
50/50
1.269
957311AF2-025 GEN
50/50
1.199
233950AC2-186 GEN
Solar/Wind Helper
0.131
233952AC2-187 GEN
Solar/Wind Helper
0.263
233954AC2-188 GEN
Solar/Wind Helper
0.263
230422AE1-104_GEN1
Solar/Wind Harmer
32.04
230425AE1-104_GEN2
Solar/Wind Harmer
32.04
232422X3-066 FULL
Solar/Wind Helper
0.062
207500AE2-000G1
Solar/Wind Harmer
21.667
207497AE2-000G2
Solar/Wind Harmer
21.667
207507AE2-000G3
Solar/Wind Harmer
21.667
207487AE2-000G4
Solar/Wind Harmer
21.667
CBM NorthLTFEXP_CBM-N->PJM
CBM
21.633
G-007ALTFEXP_G-007A->PJM
CMTX
19.216
VFTLTFEXP_VFT->PJM
CMTX
44.501
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.832
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.496
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
3.325
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.711
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.214
MDUPJM->LTFIMP_MDU
CLTF
0

Details for HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line l/o DPL_P4_2_REDLION-HOPE AT50_SRT-A


This cycle required topology changing upgrades. After applying these topology changing upgrades to the study case, this flowgate was a Increase to the base run which does not include the topology changing upgrades.

Topology Case Flowgate

Area:PJM
Facility Description:
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_REDLION-HOPE AT50_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:105.47 %
Rating:1150.0 MVA
Rating Type:B
MVA to Mitigate:1212.88
MW Contribution:
44.39
Impact of Topology Modeling:
Increase

Base Case Flowgate

Area:PJM
Facility Description:
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line
Contingency Name:
DPL_P4_2_REDLION-HOPE AT50_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.24 %
Rating:1150.0 MVA
Rating Type:B
MVA to Mitigate:1152.8
MW Contribution:
43.74
Bus #Bus NameTypeMW Contribution
20628028LAKEHURS
50/50
0.502
20628028LAKEHURS
50/50
0.943
20636028O CRK C1
50/50
4.739
20636128O CRK C2
50/50
4.524
20676328BVR_Y1-020
Solar/Wind Harmer
0
20740028PL_AA1-060
50/50
0.202
207439AE1-081 C O1
Solar/Wind Harmer
0
217206BARNGR HS C
Solar/Wind Harmer
0
217208PARK ELE C
Solar/Wind Harmer
0
217209CENTRL HS C
Solar/Wind Harmer
0
217211CAMDEN ST C
Solar/Wind Harmer
0
232404W1-003 C
Solar/Wind Helper
0.258
232408W1-005 C
Solar/Wind Helper
0.258
232410W1-006 C
Solar/Wind Helper
0.258
232417X3-008 C
Solar/Wind Helper
0.241
232426Y1-080 FULL
Solar/Wind Helper
0.041
232428Y3-058 C
Solar/Wind Helper
0.192
217081WEATEXAS C
Solar/Wind Harmer
0
218428ETC SOLAR C
Solar/Wind Harmer
0
218438BLK ROCK C
Solar/Wind Harmer
0
218449LINSOLAR C
Solar/Wind Harmer
0
219137THOSOLAR C
Solar/Wind Harmer
0
219236SOUTHERNHQ C
Solar/Wind Harmer
0
219249CENTRALDIV C
Solar/Wind Harmer
0
219612MATRIX C
Solar/Wind Harmer
0
219620RIDERU C
Solar/Wind Harmer
0
219817TRENTONSOL C
Solar/Wind Harmer
0
228200CARL#1CT
50/50
4.515
228201CARL#2CT
50/50
4.748
228202CUMB CT
50/50
14.714
228203P06
50/50
16.059
228206SHRMN CT
50/50
14.468
228251CARLLS#4
50/50
0.697
228307PCLP GT
50/50
6.982
228400MICK 1CT
50/50
6.231
228727W2-039G
50/50
9.505
228732V1-021 C
50/50
0.294
232406W1-004 FULL
Solar/Wind Helper
0.258
232436AB1-176 C
Solar/Wind Helper
0.043
232424Y1-079 C
Solar/Wind Helper
0.108
218524CNTRALGAS1 C
Solar/Wind Harmer
0
218526CNTRALGAS2 C
Solar/Wind Harmer
0
233901CHERRYDALE C
Solar/Wind Helper
0.258
233940AF2-379 C
Solar/Wind Helper
0.05
219727YARDVSOLFA C
Solar/Wind Harmer
0
228717S121
50/50
9.417
233944AB2-135 GEN
Solar/Wind Helper
0.714
233946AB2-136 GEN
Solar/Wind Helper
0.623
233994AC2-023 GEN
Solar/Wind Helper
0.582
233982AB2-133 GEN
Solar/Wind Helper
0.596
233915AB1-141 GEN
Solar/Wind Helper
0.206
233918AB1-142 GEN
Solar/Wind Helper
0.206
233930AB2-032 GEN
Solar/Wind Helper
0.208
233987AB2-037 GEN
Solar/Wind Helper
2.152
233933AB2-153 GEN
Solar/Wind Helper
0.208
233955AB2-172 GEN
Solar/Wind Helper
0.602
233935AB2-179 C
Solar/Wind Helper
0.447
234015AF2-250 C
Solar/Wind Helper
0.025
234036AF2-325 C
Solar/Wind Helper
0.121
207522AF2-254 C
Solar/Wind Harmer
0.052
207528AF2-192 GEN
Solar/Wind Harmer
0.022
233923SMA
Solar/Wind Helper
0.833
230430AE1-229_GEN
Solar/Wind Harmer
1.029
219623KINSLEYBEA C
Solar/Wind Harmer
0
233964AF2-378 GEN
Solar/Wind Helper
0.032
200036SALEM-G1
50/50
16.322
207511W3-106 GEN
Solar/Wind Harmer
0
230407AD2-065 C
Solar/Wind Harmer
0
232432Z2-076 GEN
Solar/Wind Helper
0.035
232434Z2-077 GEN
Solar/Wind Helper
0.067
233996TM1833_GEN
Solar/Wind Helper
0.227
233997TMININ_4.2
Solar/Wind Helper
0.227
233998TM1NIN_3.36
Solar/Wind Helper
0.227
963401AG1-189 GEN
Solar/Wind Harmer
0.063
970025AG2-016 GEN
Solar/Wind Harmer
0.104
970453AG2-297 GEN
Solar/Wind Harmer
0.153
970997AG2-616 GEN
Solar/Wind Harmer
0.345
971189AH1-054 GEN
Solar/Wind Harmer
0.042
971521AH1-258 GEN
Solar/Wind Harmer
0.084
971667AH1-334 GEN
Solar/Wind Harmer
0.097
219918AC2-009 C
Solar/Wind Harmer
0
972141AH1-641 GEN
Solar/Wind Harmer
0.104
972251AH1-710 GEN
50/50
63.786
200037SALEM-G2
50/50
16.186
200039HOPE CG1
50/50
17.398
945731AF1-238 GEN
50/50
3.02
945741AF1-239 GEN
50/50
1.812
971525AH1-260 GEN
50/50
44.39
957251AF2-019 GEN
50/50
1.236
957311AF2-025 GEN
50/50
1.168
233950AC2-186 GEN
Solar/Wind Helper
0.137
233952AC2-187 GEN
Solar/Wind Helper
0.273
233954AC2-188 GEN
Solar/Wind Helper
0.273
230422AE1-104_GEN1
Solar/Wind Harmer
31.225
230425AE1-104_GEN2
Solar/Wind Harmer
31.225
232422X3-066 FULL
Solar/Wind Helper
0.064
207500AE2-000G1
Solar/Wind Harmer
21.093
207497AE2-000G2
Solar/Wind Harmer
21.093
207507AE2-000G3
Solar/Wind Harmer
21.093
207487AE2-000G4
Solar/Wind Harmer
21.093
CBM NorthLTFEXP_CBM-N->PJM
CBM
21.072
G-007ALTFEXP_G-007A->PJM
CMTX
18.689
VFTLTFEXP_VFT->PJM
CMTX
43.265
GibsonPJM->LTFIMP_GIBSON
CLTF
0
HAMLETPJM->LTFIMP_HAMLET
CLTF
0.786
CATAWBAPJM->LTFIMP_CATAWBA
CLTF
0.469
PRAIRIEPJM->LTFIMP_PRAIRIE
CLTF
3.136
TRIMBLEPJM->LTFIMP_TRIMBLE
CLTF
0.67
CALDErWOODPJM->LTFIMP_CALDERWOOD
CLTF
0
CHEOAHPJM->LTFIMP_CHEOAH
CLTF
0
BlueGrassPJM->LTFIMP_BlueG
CLTF
2.088
MDUPJM->LTFIMP_MDU
CLTF
0
CONTINGENCY 'PJM500_PS_P1-2_5015_SRT-A'
 TRIP LINE FROM BUS 200027 TO BUS 200029 CKT 1   /*REDLION      500.0 - HOPE CRK     500.0
END
CONTINGENCY 'PJM500_PS_P2-3_HOPC_3-4_SRT-A'
 TRIP LINE FROM BUS 200027 TO BUS 200029 CKT 1   /*REDLION      500.0 - HOPE CRK     500.0
END
CONTINGENCY 'DPL_P4_2_REDLION-HOPE AT50_SRT-A'
 OPEN LINE FROM BUS 200027 TO BUS 200029 CIRCUIT 1   /*REDLION      500.0 - HOPE CRK     500.0
 OPEN LINE FROM BUS 200027 TO BUS 231004 CIRCUIT 1   /*REDLION      500.0 - RL_230       230.0
END
232012 to 232013 ckt 1

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

StudyAreaFacility DescriptionContingency NameContingency TypeDC|ACFinal Cycle LoadingRating (MVA)Rating TypeMVA to MitigateMW ContributionDetails
IPDBGE/PECO
COOPER-GRACETON 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC101.07 %639.0B645.83
19.04
IPDBGE/PECO
COOPER-GRACETON 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC101.07 %639.0B645.82
19.05
IPDBGE/PECO
COOPER-GRACETON 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC101.04 %639.0B645.63
19.04
IPDBGE/PECO
COOPER-GRACETON 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC101.04 %639.0B645.63
19.04
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC107.23 %639.0B685.21
19.04
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC107.19 %639.0B684.96
19.05
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC107.16 %639.0B684.77
19.04
IPDPECO
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC107.16 %639.0B684.77
19.04
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC107.23 %639.0B685.21
19.04
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC107.19 %639.0B684.96
19.05
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC107.16 %639.0B684.77
19.04
IPDPECO
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC107.16 %639.0B684.77
19.04
IPDPJM
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC100.52 %3926.0B3946.56
93.7
IPDPJM
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC100.46 %3926.0B3944.1
93.7
IPDPJM
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC100.46 %3926.0B3944.1
93.7
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P1-2_PE-500-3835T_SRT-A
SingleAC119.92 %3700.0B4437.13
96.02
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P2-3_PE-500-019E_SRT-W
BreakerAC119.87 %3700.0B4435.02
96.05
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
AP_P2-3_PE-500-019B_SRT-A
BreakerAC115.76 %3700.0B4283.04
90.42
IPDPJM
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
PECO_P1-2_5007_SRT-A/* $ CHESCO $ PECO_P1-2_5007 $ L
SingleAC111.49 %3700.0B4125.11
96.38
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PJM_500_BG_P4_5_CNSTN_C_SRT-A
BreakerAC104.97 %639.0B670.75
19.04
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
BreakerAC104.94 %639.0B670.56
19.05
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
PECO_P1-2_5012_SRT-A
SingleAC104.91 %639.0B670.38
19.04
IPDPECO
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
BGE_P4_GRACETON_51_SRT-A
BreakerAC104.91 %639.0B670.38
19.04

Details for [AH1-260] COOPER-GRACETON 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:BGE/PECO
Facility Description:
COOPER-GRACETON 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.07 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:645.83
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] COOPER-GRACETON 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:BGE/PECO
Facility Description:
COOPER-GRACETON 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.07 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:645.82
MW Contribution:
19.05
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.047

Details for [AH1-260] COOPER-GRACETON 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:BGE/PECO
Facility Description:
COOPER-GRACETON 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:101.04 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:645.63
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] COOPER-GRACETON 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:BGE/PECO
Facility Description:
COOPER-GRACETON 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:101.04 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:645.63
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.23 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:685.21
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.19 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:684.96
MW Contribution:
19.05
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.047

Details for [AH1-260] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.16 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:684.77
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.16 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:684.77
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.23 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:685.21
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.19 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:684.96
MW Contribution:
19.05
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.047

Details for [AH1-260] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:107.16 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:684.77
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:107.16 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:684.77
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] PCHBTM1N-CHAN 500.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.52 %
Rating:3926.0 MVA
Rating Type:B
MVA to Mitigate:3946.56
MW Contribution:
93.7
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
93.696

Details for [AH1-260] PCHBTM1N-CHAN 500.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:100.46 %
Rating:3926.0 MVA
Rating Type:B
MVA to Mitigate:3944.1
MW Contribution:
93.7
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
93.696

Details for [AH1-260] PCHBTM1N-CHAN 500.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1N-CHAN 500.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:100.46 %
Rating:3926.0 MVA
Rating Type:B
MVA to Mitigate:3944.1
MW Contribution:
93.7
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
93.696

Details for [AH1-260] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P1-2_PE-500-3835T_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P1-2_PE-500-3835T_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:119.92 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4437.13
MW Contribution:
96.02
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
96.018

Details for [AH1-260] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P2-3_PE-500-019E_SRT-W


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-019E_SRT-W
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:119.87 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4435.02
MW Contribution:
96.05
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
96.049

Details for [AH1-260] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o AP_P2-3_PE-500-019B_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
AP_P2-3_PE-500-019B_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:115.76 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4283.04
MW Contribution:
90.42
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
90.421

Details for [AH1-260] PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line l/o PECO_P1-2_5007_SRT-A/* $ CHESCO $ PECO_P1-2_5007 $ L


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PJM
Facility Description:
PCHBTM1S-CNASTONE 500.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5007_SRT-A/* $ CHESCO $ PECO_P1-2_5007 $ L
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:111.49 %
Rating:3700.0 MVA
Rating Type:B
MVA to Mitigate:4125.11
MW Contribution:
96.38
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
96.381

Details for [AH1-260] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PJM_500_BG_P4_5_CNSTN_C_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PJM_500_BG_P4_5_CNSTN_C_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.97 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:670.75
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PECO_P4_PEACH235_SRT-A/* $ CHESCO $ PECO_P4_PEACH235 $ STBK
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.94 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:670.56
MW Contribution:
19.05
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.047

Details for [AH1-260] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o PECO_P1-2_5012_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
PECO_P1-2_5012_SRT-A
Contingency Type:Single
DC|AC:AC
Final Cycle Loading:104.91 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:670.38
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039

Details for [AH1-260] PCHBTMTP-COOPER2 230.0 kV Ckt 1 line l/o BGE_P4_GRACETON_51_SRT-A


This cycle required topology changing upgrades. This base run flowgate was eliminated as a result of the topology changing upgrades.

Base Case Flowgate

Area:PECO
Facility Description:
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line
Contingency Name:
BGE_P4_GRACETON_51_SRT-A
Contingency Type:Breaker
DC|AC:AC
Final Cycle Loading:104.91 %
Rating:639.0 MVA
Rating Type:B
MVA to Mitigate:670.38
MW Contribution:
19.04
IPD Plant:AH1-260
Impact of Topology Modeling:
Elimination
Bus #Bus NameTypeMW Contribution
971525AH1-260 GEN
PJM_IPD
19.039
CONTINGENCY 'PJM_500_BG_P4_5_CNSTN_C_SRT-A'
 OPEN BRANCH FROM BUS 200004 TO BUS 200064 CKT 1    /*CNASTONE     500.0 - PCHBTM1S     500.0
 OPEN BRANCH FROM BUS 200004 TO BUS 200100 CKT ZC   /*CNASTONE     500.0 - CNASTCAP     500.0
END
CONTINGENCY 'PECO_P4_PEACH235_SRT-A
 TRIP BRANCH FROM BUS 200064 TO BUS 200004 CKT 1    /*PCHBTM1S     500.0 - CNASTONE     500.0
 TRIP BRANCH FROM BUS 200064 TO BUS 200065 CKT Z1   /*PCHBTM1S     500.0 - PCHBTM2S     500.0
END
CONTINGENCY 'BGE_P4_GRACETON_51_SRT-A'
 OPEN BRANCH FROM BUS 200004 TO BUS 200064 CKT 1   /*CNASTONE     500.0 - PCHBTM1S     500.0
END
CONTINGENCY 'PECO_P1-2_5012_SRT-A'
 TRIP BRANCH FROM BUS 200064 TO BUS 200004 CKT 1   /*PCHBTM1S     500.0 - CNASTONE     500.0
END
CONTINGENCY 'AP_P1-2_PE-500-3835T_SRT-A'
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
END
CONTINGENCY 'AP_P2-3_PE-500-019E_SRT-W'
 DISCONNECT BRANCH FROM BUS 235105 TO BUS 235459 CKT 1   /*01DOUBS      500.0 - 01DOUBS      230.0
 DISCONNECT BRANCH FROM BUS 235105 TO BUS 235459 CKT 3   /*01DOUBS      500.0 - 01DOUBS      230.0
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
 REMOVE SWSHUNT FROM BUS 235105 BLOCK 1 STEP 2           /*01DOUBS      500.0
END
CONTINGENCY 'AP_P2-3_PE-500-019B_SRT-A'
 DISCONNECT BRANCH FROM BUS 235105 TO BUS 200003 CKT 1   /*01DOUBS      500.0 - BRIGHTON     500.0
 DISCONNECT BRANCH FROM BUS 270095 TO BUS 235105 CKT 1   /*CHAN         500.0 - 01DOUBS      500.0
END
CONTINGENCY 'PECO_P1-2_5007_SRT-A
 TRIP BRANCH FROM BUS 200066 TO BUS 270095 CKT 1   /*PCHBTM1N     500.0 - CHAN         500.0
END
214084 to 220964 ckt 1
213844 to 213846 ckt 1
213846 to 213869 ckt 1
200066 to 270095 ckt 1
200064 to 200004 ckt 1
213869 to 214087 ckt 1

Light Load Analysis

The New Service Request AH1-260 was evaluated as a 300.0 MW injection and 300.0 MW withdrawal in the AEC area.

AH1-260 was evaluated as part of a plant. The total Energy output of the plant was evaluated at its maximum seasonal capability of 300.0 MW (300.0 MW under study).

Note: The capacity portion of Generation Interconnection Requests are evaluated for single or N-1 contingencies. The energy portion, ramped up to a percentage of its full energy output based on season and fuel-specific ramping limits, of Generation Interconnection Requests are evaluated for multiple facility (common mode) contingencies (double circuit tower line, fault with a stuck breaker, and bus fault). For additional details regarding Generator Deliverability, reference PJM Manual 14B, Attachment C, Section C.3.

The following flowgates remain after considering the topology reinforcements required by the cycle.

(No impacts were found for this analysis)

The following flowgates were eliminated after considering the topology reinforcements required by the cycle.

(No flowgates were eliminated after considering the topology reinforcements required by the cycle.)

Short Circuit Analysis

Analysis Complete - No Issues

Based on PJM’s TC2 Phase II Short Circuit Analysis, this project did not contribute >1% fault duty to any previously identified overdutied breakers, nor did it cause any new overdutied breakers.

Please note that in TC2 Phase III, PJM will perform additional analysis including the evaluation of impacts from topology upgrades which may have potential effects on breaker duties not seen in the Phase II analysis.

Stability Analysis

Analysis Complete - No Issues

Executive Summary Summer Peak Analysis:

New Service Requests (projects) in PJM Transition Cycle 2, Cluster 87 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 87 projects.

This analysis is effectively a screening study to determine whether the addition of the Cluster 87 projects will meet the dynamics requirements of the NERC, AEC, and PJM reliability standards.

The load flow scenario for the analysis was based on the RTEP 2028 summer peak load case, modified to include applicable projects. Cluster 87 projects have been dispatched online at maximum power output, with 1.0 pu voltage at the terminal bus.

Cluster 87 projects were tested for compliance with NERC, PJM, Transmission Owner, and other applicable criteria. A steady-state condition and 268 contingencies were studied, each with a 20 second simulation time period. Studied faults included:

  1. Steady-state operation (20-second run);
  2. Three-phase faults with normal clearing time; (including unsuccessful high-speed reclosing);
  3. Single-phase bus faults with normal clearing time;
  4. Single-phase faults single-phase delayed clearing due to a stuck breaker;
  5. Single-phase faults placed at 80% of the line with delayed (Zone 2) clearing at line end remote from the fault due to primary communications/relay failure;
  6. Single-phase faults with loss of multiple-circuit tower line (and with unsuccessful high-speed reclosing).

For all simulations, the queue project under study along with the rest of the PJM system were required to maintain synchronism, with all states returning to an acceptable new condition following the disturbance.

For all of the fault contingencies tested on the 2028 peak load case:

  1. Cluster 87 projects were able to ride through the faults (except for faults where protective action trips a generator(s)).
  2. The system with Cluster 87 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.
  3. Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus).
  4. No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

AG2-297, AG2-616, AH1-260, AH1-641, and AH1-701 meet the 0.95 leading and lagging PF requirement.

AH1-701 N1 exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. Simulation was run for 40 seconds for these contingencies and the results show that this issue did not cause instability in the system and the models can be tuned to achieve a faster reactive power output settlement upon request.

AH1-260 GEN 1 and GEN 2 exhibited slow reactive power recovery following several contingencies, though system stability was not compromised. To improve performance, model tuning was conducted. In the REPCA1 models, the reactive power PI control integral gain and the reactive current compensation gain, Ki and Kc increased from 0.5 pu to 3 pu and 0.0 pu to 0.06 pu, respectively. These changes improved reactive power recovery.

The IPCMD and IQCMD states in the REGCA model of AG2-297, AG2-616, AH1-260 GEN 1, AH1-260 GEN 2, and AH1-641 showed erratic behavior for some contingencies in which these generators have been disconnected as part of the contingency event. Since the machine is disconnected and no active or reactive power is injected into the system, this behavior is likely fictitious and a limitation of the software. This does not cause instability in the system.

At the Dennis 230 kV bus, which is one substation away from the Columbia 230 kV bus (AG2-297 POI), voltage oscillations were observed under multiple contingencies. These oscillations are caused by the behavior of the 150 MVAr SVC at Dennis. This does not cause instability in the system.

No mitigations were found to be required.

Table 1: TC2 Cluster 87 Projects

Project

Fuel Type

Transmission Owner

MFO

MWE

MWC

Point of Interconnection

AG2-297

Solar

AEC

19

19

11.4

Cumberland 230 kV Substation

AG2-616

Solar

AEC

50

50

32.35

Churchtown – Upper Pittsgrove 138 kV

AH1-260

Storage

AEC

300

300

300

New Freedom – Monroe 230 kV

AH1-641

Solar

AEC

65

15

7

Churchtown – Upper Pittsgrove 138 kV

AH1-701

Natural Gas

AEC

61

0

20

Valero 69 kV

 

Executive Summary Light Load Analysis:

New Service Requests (projects) in PJM Transition Cycle 2, Cluster 87 are listed in Table 1 below. This report will cover the dynamic analysis of Cluster 87 projects.

This analysis is effectively a screening study to determine whether the addition of the Cluster 87 projects will meet the dynamics requirements of the NERC, AEC, and PJM reliability standards.

The load flow scenario for the analysis was based on the RTEP 2028 light load case, modified to include applicable projects. Cluster 87 projects have been dispatched online at maximum power output, with 1.0 pu voltage at the terminal bus.

Cluster 87 projects were tested for compliance with NERC, PJM, Transmission Owner, and other applicable criteria. A steady-state condition and 268 contingencies were studied, each with a 20 second simulation time period. Studied faults included:

  1. Steady-state operation (20-second run);
  2. Three-phase faults with normal clearing time; (including unsuccessful high-speed reclosing);
  3. Single-phase bus faults with normal clearing time;
  4. Single-phase faults single-phase delayed clearing due to a stuck breaker;
  5. Single-phase faults placed at 80% of the line with delayed (Zone 2) clearing at line end remote from the fault due to primary communications/relay failure;
  6. Single-phase faults with loss of multiple-circuit tower line (and with unsuccessful high-speed reclosing).

For all simulations, the queue project under study along with the rest of the PJM system were required to maintain synchronism, with all states returning to an acceptable new condition following the disturbance.

For all of the fault contingencies tested on the 2028 light load case:

  1. Cluster 87 projects were able to ride through the faults (except for faults where protective action trips a generator(s)).
  2. The system with Cluster 87 projects included is transiently stable and post-contingency oscillations were positively damped with a damping margin of at least 3% for interarea modes and 4% for local modes.
  3. Following fault clearing, all bus voltages recovered to a minimum of 0.7 per unit after 2.5 seconds (except where protective action isolates that bus).
  4. No transmission element tripped, other than those either directly connected or designed to trip as a consequence of that fault.

AG2-297, AG2-616, AH1-260, AH1-641, and AH1-701 meet the 0.95 leading and lagging PF requirement.

AH1-701 N1 exhibited slow reactive power recovery within the 20 second simulation window for several contingencies. Simulation was run for 40 seconds for these contingencies and the results show that this issue did not cause instability in the system and the models can be tuned to achieve a faster reactive power output settlement upon request.

AH1-260 GEN 1 and GEN 2 exhibited slow reactive power recovery following several contingencies, though system stability was not compromised. To improve performance, model tuning was conducted. In the REPCA1 models, the reactive power PI control integral gain and the reactive current compensation gain, Ki and Kc increased from 0.5 pu to 3 pu and 0.0 pu to 0.06 pu, respectively. These changes improved reactive power recovery.

The IPCMD and IQCMD states in the REGCA model of AG2-297, AG2-616, AH1-260 GEN 1, AH1-260 GEN 2, and AH1-641 showed erratic behavior for some contingencies in which these generators have been disconnected as part of the contingency event. Since the machine is disconnected and no active or reactive power is injected into the system, this behavior is likely fictitious and a limitation of the software. This does not cause instability in the system.

At the Dennis 230 kV bus, which is one substation away from the Columbia 230 kV bus (AG2-297 POI), voltage oscillations were observed under multiple contingencies. These oscillations are caused by the behavior of the 150 MVAr SVC at Dennis. This does not cause instability in the system.

High voltage spikes occurred in the simulations immediately after fault clearing for some of the contingencies studied (i.e., fault where spike is observed]). The voltage spike is a known artifact of the WECC generic renewable models as stated in the WECC Solar Plant Dynamic Model Guidelines: “It should be noted that generic dynamic models for inverter-based generator tend to produce a short-duration (a cycle or shorter) voltage spike at fault inception and clearing. These spikes should be ignored in most cases, as they do not represent the performance of actual hardware. They are simply a consequence of the model’s limited bandwidth, integration time step, and the way current injection models interface with the network solution.”

No mitigations were found to be required.

Table 1: TC2 Cluster 87 Projects

Project

Fuel Type

Transmission Owner

MFO

MWE

MWC

Point of Interconnection

AG2-297

Solar

AEC

19

19

11.4

Cumberland 230 kV Substation

AG2-616

Solar

AEC

50

50

32.35

Churchtown – Upper Pittsgrove 138 kV

AH1-260

Storage

AEC

300

300

300

New Freedom – Monroe 230 kV

AH1-641

Solar

AEC

65

15

7

Churchtown – Upper Pittsgrove 138 kV

AH1-701

Natural Gas

AEC

61

0

20

Valero 69 kV

 

Reactive Power Analysis

Analysis Complete - No Issues

The reactive power capability of AH1-260 meets the 0.95 leading and lagging PF requirement at the high side of the main transformer.

Steady-State Voltage Analysis

Analysis Complete - No Issues

Steady State Voltage Analysis complete, no voltage issues identified.

New Service Request Dependencies

The New Service Requests below are listed in one or more dispatch for the overloads identified in this report. These projects contribute to the loading of the overloaded facilities identified in this report. The percent overload of a facility and cost allocation you may have towards a particular reinforcement could vary depending on the action of other projects. The status of each project at the time of the analysis is presented in the table. This list may change as other projects withdraw or modify their requests. This table is valid for load flow analyses only.

New Service Requests Dependencies
Project IDProject NameStatus
AA2-184Atlantic-Red Bank 34kVIn Service
AB1-001Absecon 12 kVIn Service
AB1-138Navy 34.5kVIn Service
AB1-139Metuchen 26kVIn Service
AB1-141Church-Wye Mills 138 kV IIn Service
AB1-142Church-Wye Mills 138 kV IIIn Service
AB1-176Price 25kV IIEngineering & Procurement
AB2-032Church-Wye Mills 138 kVIn Service
AB2-036Church - Oil City 138kVSuspended
AB2-037Keeney-Steele 230kVPartially in Service - Under Construction
AB2-049Gloucester Township 12kVIn Service
AB2-057Brunswick 26kVIn Service
AB2-133Chestertown 69kVUnder Construction
AB2-135Church-Kent 69kVIn Service
AB2-136Cambridge-West Cambridge 69kVIn Service
AB2-153Church-Wye Mills 138 kVIn Service
AB2-172Todd 69kVIn Service
AB2-179Townsend 138kVIn Service
AC1-010Gloucester 26kVPartially in Service - Under Construction
AC1-017Levittown 13 kVIn Service
AC1-030Cinnaminson 13kVIn Service
AC1-091Cedar Creek 138kV ISuspended
AC1-092Cedar Creek 138kV IISuspended
AC1-093Cedar Creek 138kV IIISuspended
AC1-094Cedar Creek 138kV IVSuspended
AC1-190East New Market 69kVSuspended
AC2-009Pennington 13 kVIn Service
AC2-023Hebron 69kVSuspended
AC2-185Cedar Creek 138kV IISuspended
AC2-186Harrington 25kVUnder Construction
AC2-187Harrington 69kVUnder Construction
AC2-188Harrington 69 kVUnder Construction
AD2-027Camden Switch 26 kVIn Service
AD2-042Camden Switch 26 kV IIIn Service
AD2-065Atco 12 kVIn Service
AD2-076Carville 138 kVWithdrawn
AD2-135Williamstown 12kVPartially in Service - Under Construction
AE1-041Edison 4kVIn Service
AE1-081Landing 12.47 kVIn Service
AE1-104BL England 138 kVSuspended
AE1-142Manitou-Pleasant Plains 34.5 kVIn Service
AE1-229Deepwater-Upper Pittsgrove 138 kVSuspended
AE2-112Carville 138 kV IIWithdrawn
AF1-007Indian River 230 kV ISuspended
AF1-036Carville 138 kV IIIWithdrawn
AF1-238Sherman Ave - West Vineland 69 kVEngineering & Procurement
AF1-239Sherman Ave - West Vineland 69 kVEngineering & Procurement
AF1-262Upper Pittsgrove 12 kVIn Service
AF1-264Runnemede 13 kVIn Service
AF2-019Middle 69 kVEngineering & Procurement
AF2-025Ontario 69 kVEngineering & Procurement
AF2-192Frenchtown Solar-West Flemington 34.5 kVSuspended
AF2-247Bustleton 13.2 kVIn Service
AF2-250Edgewood 12 kV IIIIn Service
AF2-254Cookstown-New Lisbon 34.5 kVWithdrawn
AF2-325Jacktown 12 kVEngineering & Procurement
AF2-378Cambridge 12 kVEngineering & Procurement
AF2-379Princess Anne 25 kVUnder Construction
AG1-130Burlington 26 kVEngineering & Procurement
AG1-188Manitou-Oyster Creek 34.5 kVEngineering & Procurement
AG1-189Oyster Creek-Bamber Lake 34.5Engineering & Procurement
AG1-223Larrabee-Allaire 34.5 kVUnder Construction
AG1-254Salem-Woodstown 69 kVEngineering & Procurement
AG1-499Lambs 12.47 kVUnder Construction
AG2-016Oyster Creek-Whitings 34.5 kVActive
AG2-297Cumberland 230 kVActive
AG2-380Carville 138 kV IVActive
AG2-447Cedar Creek 138 kV VIIActive
AG2-616Churchtown - Upper Pittsgrove 138 kVActive
AG2-625Pequest River-Furnace Brook Tap 34.5 kV IIActive
AG2-626Pequest River-Furnace Brook Tap 34.5 kV IIIActive
AH1-054Upton-Whitings 34.5 kVActive
AH1-057Edgewood 12.47 kVActive
AH1-257Broadway - Washington 34.5 kVActive
AH1-258Belford - Keansburg 34.5 kVActive
AH1-334Lakehurst - Whitings 34.5 kVActive
AH1-641Churchtown - Upper Pittsgrove 138kVActive
AH1-672Farmview 138 kVActive
AH1-701Valero 69 kVActive
AH1-710Salem 500kVActive
V1-021Cape May County 12kVIn Service
V2-041Clayville 12kVIn Service
V2-046Pilesgrove Township 12kVIn Service
V4-054Fairfield Township 12kVIn Service
V4-067Cates Road Egg Harbor Township 12kVDeactivated
W1-003Oak HallIn Service
W1-004Oak HallIn Service
W1-005Oak HallIn Service
W1-006Oak HallIn Service
W1-130Vine Road 12kVIn Service
W2-030Egg Harbor TownshipIn Service
W2-039Clayville 69kVIn Service
W3-106Sussex-Wykertown 34.5kVIn Service
X3-008Todd 69kVIn Service
X3-066Church Hill 69kVIn Service
Y1-079Wye Mills 69kVIn Service
Y1-080Dorchester 12kVIn Service
Y2-105Eagle Point 230kVIn Service
Y3-058Rockawalkin 69kVIn Service
Z2-076Worcester South 25kVIn Service
Z2-077Worcester North 25kVIn Service

Affected System - PJM Identified Violations

As part of PJM's analysis, per Tariff Part VII.G.336 & Manual 14H, Section 13, PJM evaluated the potential impacts on tie line facilities between PJM and an affected system entity, which were identified per PJM planning analysis criteria. This upgrade may be required on the affected system portion of the tie line along with cost allocation of such upgrade if applicable, in coordination with the affected system. Depending on the affected system, this project may not be contingent on upgrade based on PJM planning analysis criteria, but may be contingent on this upgrade based on the Affected System Operator's planning criteria, provided in the Affected Systems Study Section, herein.

Midcontinent Independent System Operator, Inc. (MISO)No Impact
New York Independent System Operator (NYISO)No Impact
Tennessee Valley Authority (TVA)No Impact
Louisville Gas & Electric (LG&E)No Impact
Duke Energy Carolinas (DUKE)No Impact
Duke Energy Progress – East (CPLE)No Impact
Duke Energy Progress – West (CPLW)No Impact

Affected System - Non-PJM Identified Violations

In accordance with PJM Tariff Part VII, Subpart D, section 310.A and as outlined in PJM Manual 14H, Sections 4.5 and 13, in Phase II of the Cycle, PJM provides the Affected System Operator any updates on the PJM projects that require an Affected Systems Study based on their response at DP1. New Service Requests that require an Affected Systems Study are required to enter into an Affected Systems Study Agreement with the Affected System Operator, as applicable, prior to the close of DP2 or they will be withdrawn from the Cycle.

If the Project Developer already entered into the necessary agreement and the results are available, PJM will supply them in the Phase II SIS report. See below for the status of any required Affected Systems Study. A status of “Pending” means that the study is not yet completed by the Affected System Operator. If your project requires an Affected Systems Study and your results are not provided for Phase II SIS, PJM anticipates providing them in the Phase III SIS per Tariff Part VII.D.312.

Midcontinent Independent System Operator, Inc. (MISO)Not required
New York Independent System Operator (NYISO)Not required
Tennessee Valley Authority (TVA)Not required
Louisville Gas & Electric (LG&E)Not required
Duke Energy Carolinas (DUKE)Not required
Duke Energy Progress – East (CPLE)Not required
Duke Energy Progress – West (CPLW)Not required

System Reinforcements

Based on the Phase II System Impact Study analysis results, this project is contingent on and may have cost responsibility for the following System Reinforcements:

AH1-260 System Reinforcements:
TORTEP IDTitleCategoryAllocated Cost ($USD)Facilities Study
BGEb3780.5Build Solley Road substation + Statcom (Projected ISD 12/31/2028)Contingent$0N/A
BGEb3780.6Build Granite substation + Statcom (Projected ISD 12/31/2028)Contingent$0N/A
PEPCOb3780.11Brighton Statcom and Capacitor (Projected ISD 12/31/2028)Contingent$0N/A
BGEb3780.7Build new Batavia Road substation (Projected ISD 12/31/2028)Contingent$0N/A
BGEb3780.8Graceton 500 kV substation expansion (Projected ISD 12/31/2028)Contingent$0N/A
BGEb3780.9Graceton to Batavia Road 230 kV double circuit pole line (Projected ISD 12/31/2028)Contingent$0N/A
BGEb3780.13Batavia Road to Riverside 230 kV reconductorContingent$0N/A
PECOb3780.15Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV subContingent$0N/A
PECOb3780.17Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub (Transource)Contingent$0N/A
PECOb3780.1Peach Bottom North upgrades – substation work (Projected ISD 12/31/2028)Contingent$0N/A
PECOb3780.14Reconfigure Cooper transmission feeds by establishing new Cooper-North Delta 230 kV line and rerouting existing transmissions lines by Cooper.Contingent$0N/A
PECOb3780.16Terminate new Cooper-North Delta 230 kV line (Transource Scope) at North Delta 230 kVContingent$0N/A
PECOb3737.47Build New North Delta 500 kV substation (Four bay breaker and half configuration)Contingent$0N/A
BGEb3800.37Replace terminal equipment limitations at Conastone 500 kV - on the (existing Peach Bottom-Conastone) or (new Graceton-Conastone) 500 kV line (Projected ISD 12/31/2030)Contingent$0N/A
BGEb3800.34Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV and cut into North Delta 500kV (Projected ISD 12/31/2030)Contingent$0N/A
PECOb3800.35Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV (Projected ISD 12/1/2030)Contingent$0N/A
BGEb3800.36Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV (Projected ISD 12/31/2030)Contingent$0N/A
PECOb3800.52Reconfigure Peach Bottom North and South 500 kV yards (Projected ISD 12/1/2030)Contingent$0N/A
PECOb3800.45North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (PECO work).Contingent$0N/A
PECOb3800.50North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (Transource work).Contingent$0N/A
PEPCOb3800.46North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (PECO work).Contingent$0N/A
PECOb3800.51North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (Transource work).Contingent$0N/A
BGEb3800.29High Ridge termination for the North Delta-High Ridge 500 kV line (Projected ISD 12/31/2030)Contingent$0N/A
PECOb3800.31Build new North Delta-High Ridge 500 kV line - PECO Portion (Projected ISD 12/1/2030)Contingent$0N/A
PECOb3800.44North Delta termination for the North Delta-High Ridge 500 line (PECO work).Contingent$0N/A
PECOb3800.48North Delta termination for the North Delta-High Ridge 500 line (Transource work).Contingent$0N/A
BGEb3800.32Build new North Delta-High Ridge 500 kV line - BGE Portion (Projected ISD 12/31/2030)Contingent$0N/A
BGEb3800.26Build High Ridge 500 kV substation - Three bay breaker and half configuration (Projected ISD 12/31/2030)Contingent$0N/A
BGEb3800.27High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) - Waugh Chapel side (Projected ISD 12/31/2030)Contingent$0N/A
BGEb3800.28High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) -Brighton side (Projected ISD 12/31/2030)Contingent$0N/A
BGEb3800.30High Ridge - Install two 500/230 kV transformers (Projected ISD 12/31/2030)Contingent$0N/A
PECOb3800.47Build new Peach Bottom South-North Delta 500 kV line (Projected ISD 12/1/2030)Contingent$0N/A
PECOb3800.42Peach Bottom 500kV North bus upgrade (Projected ISD 12/1/2030)Contingent$0N/A
PECOb3800.49North Delta 500 kV termination for the Calpine generator (Calpine/Transource work).Contingent$0N/A
BGEb3800.33Replace terminal equipment limitations at Brighton 500 kV - on the existing Brighton-Waugh Chapel 500 kV (5053) or new Brighton-High Ridge 500 kV.Contingent$0N/A
PECOb3780.2Peach Bottom to Graceton (PECO Portion) – New 500kV LineContingent$0N/A
BGEb3780.4Peach Bottom to Graceton (BGE Portion) – New 500kV LineContingent$0N/A
LS Powerb3737.37Silver Run-Hope Creek 230kV Expansion (Projected ISD 6/1/2029)Contingent$0N/A
PECOb3907.3Reconductor 2.12 miles of North Philadelphia to Waneeta 230 kV line including terminal equipmentContingent$0N/A
PECOb3907.2Rebuild Richmond - Waneeta 230 kV lineContingent$0N/A
Grand Total:$0

Shown below are the details of the cost allocated, contingent, eliminated, topology and potential aggregate contributor reinforcements for this project. Please refer to the System Reinforcement table above and the information below for more detail.


System Reinforcement: b3780.5
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.5
Title
Build Solley Road substation + Statcom (Projected ISD 12/31/2028)
Description
Build Solley Road substation + Statcom. New STATCOM rating: 350 MVAR Add 4x 230 kV breakers bays.
Cost Information
Time Estimate
Dec 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.6
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.6
Title
Build Granite substation + Statcom (Projected ISD 12/31/2028)
Description
Build Granite substation + Statcom. New STATCOM rating: 350 MVAR. Add 4x 230 kV breaker bays.
Cost Information
Time Estimate
Dec 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.11
Type
Load Flow
TO
PEPCO
RTEP ID / TO ID
b3780.11
Title
Brighton Statcom and Capacitor (Projected ISD 12/31/2028)
Description
Brighton Statcom and capacitor New STATCOM rating: 350 MVAR New capacitor rating: 350 MVAR
Cost Information
Time Estimate
Dec 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.7
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.7
Title
Build new Batavia Road substation (Projected ISD 12/31/2028)
Description
Build Batavia Road substation. Add 4 x 230kV breaker bays
Cost Information
Time Estimate
Dec 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.8
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.8
Title
Graceton 500 kV substation expansion (Projected ISD 12/31/2028)
Description
Add 3x 500 kV breaker bays, 2x 500/230 kV auto transformer, 1x 500 kV caps
Cost Information
Time Estimate
Dec 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.9
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.9
Title
Graceton to Batavia Road 230 kV double circuit pole line (Projected ISD 12/31/2028)
Description
Graceton to Batavia Road 230 kV double circuit pole line New rating: 1331 MVA SN/ 1594 MVA SE
Cost Information
Time Estimate
Dec 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.13
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.13
Title
Batavia Road to Riverside 230 kV reconductor
Description
Batavia Road to Riverside 230 kV reconductor New rating: 1941 MVA SN / 2181 MVA SE
Cost Information
Time Estimate
Dec 31 2027

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.15
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.15
Title
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub
Description
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV substation by rebuilding 5012 between new terminal at Peach Bottom South and North Delta on single circuit structures and terminating at North Delta.
Cost Information
Time Estimate
Apr 10 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.17
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.17
Title
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub (Transource)
Description
Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV substation by rebuilding 5012 between new terminal at Peach Bottom South and North Delta on single circuit structures and terminating at North Delta (Transource Scope).
Cost Information
Time Estimate
May 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.1
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.1
Title
Peach Bottom North upgrades – substation work (Projected ISD 12/31/2028)
Description
Add 3x 500 kV breakers to form a breaker-and-a-half bay.
Cost Information
Time Estimate
Oct 15 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.14
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.14
Title
Reconfigure Cooper transmission feeds by establishing new Cooper-North Delta 230 kV line and rerouting existing transmissions lines by Cooper.
Description
None
Cost Information
Time Estimate
Oct 23 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.16
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.16
Title
Terminate new Cooper-North Delta 230 kV line (Transource Scope) at North Delta 230 kV
Description
None
Cost Information
Time Estimate
Oct 15 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3737.47
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3737.47
Title
Build New North Delta 500 kV substation (Four bay breaker and half configuration)
Description
Build New North Delta 500 kV substation (four bay breaker and half configuration) - the substation will include 12 - 500kV breakers and one 500/230 kV transformer, will allow the termination of six - 500 kV lines
Cost Information
Time Estimate
Oct 06 2027

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.37
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.37
Title
Replace terminal equipment limitations at Conastone 500 kV - on the (existing Peach Bottom-Conastone) or (new Graceton-Conastone) 500 kV line (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.34
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.34
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV and cut into North Delta 500kV (Projected ISD 12/31/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.35
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.35
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV (Projected ISD 12/1/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Apr 10 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.36
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.36
Title
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV (Projected ISD 12/31/2030)
Description
Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV line on single circuit structures within existing ROW and cut into North Delta 500 kV and Gracetone 500 kV stations.
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.52
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.52
Title
Reconfigure Peach Bottom North and South 500 kV yards (Projected ISD 12/1/2030)
Description
Reconfigure Peach Bottom North and South yards to allow for termination of 500 kV lines from Peach Bottom to North Delta. North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line.
Cost Information
Time Estimate
Dec 01 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.45
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.45
Title
North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (PECO work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Jan 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.50
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.50
Title
North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (Transource work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Jan 23 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.46
Type
Load Flow
TO
PEPCO
RTEP ID / TO ID
b3800.46
Title
North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (PECO work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
Dec 11 2029

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.51
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.51
Title
North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (Transource work).
Description
Loops in the 500kV line from Peach Bottom to Rock Springs into the new North Delta (Bramah) sub
Cost Information
Time Estimate
May 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.29
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.29
Title
High Ridge termination for the North Delta-High Ridge 500 kV line (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.31
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.31
Title
Build new North Delta-High Ridge 500 kV line - PECO Portion (Projected ISD 12/1/2030)
Description
None
Cost Information
Time Estimate
Dec 15 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.44
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.44
Title
North Delta termination for the North Delta-High Ridge 500 line (PECO work).
Description
None
Cost Information
Time Estimate
Dec 15 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.48
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.48
Title
North Delta termination for the North Delta-High Ridge 500 line (Transource work).
Description
None
Cost Information
Time Estimate
Dec 15 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.32
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.32
Title
Build new North Delta-High Ridge 500 kV line - BGE Portion (Projected ISD 12/31/2030)
Description
Build new North Delta-High Ridge 500 kV line. (~59 miles)
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.26
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.26
Title
Build High Ridge 500 kV substation - Three bay breaker and half configuration (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.27
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.27
Title
High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) - Waugh Chapel side (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.28
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.28
Title
High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) -Brighton side (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.30
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.30
Title
High Ridge - Install two 500/230 kV transformers (Projected ISD 12/31/2030)
Description
None
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.47
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.47
Title
Build new Peach Bottom South-North Delta 500 kV line (Projected ISD 12/1/2030)
Description
Build new Peach Bottom South-North Delta 500 kV line – cut in to Peach Bottom tie No. 1 and extending line to North Delta (~1.25 miles new ROW).
Cost Information
Time Estimate
Jan 14 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.42
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.42
Title
Peach Bottom 500kV North bus upgrade (Projected ISD 12/1/2030)
Description
Peach Bottom 500kV North bus upgrade - Replace 11 – Instances of strain bus conductor used for breaker drops or CT drops, 7 – 500 kV disconnect switches, 7 – Free Standing CTs, 1 – 500 kV breaker, 2 – Breaker relays or meters.
Cost Information
Time Estimate
Dec 01 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.49
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3800.49
Title
North Delta 500 kV termination for the Calpine generator (Calpine/Transource work).
Description
None
Cost Information
Time Estimate
Oct 06 2027

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3800.33
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3800.33
Title
Replace terminal equipment limitations at Brighton 500 kV - on the existing Brighton-Waugh Chapel 500 kV (5053) or new Brighton-High Ridge 500 kV.
Description
None
Cost Information
Time Estimate
Dec 31 2030

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.2
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3780.2
Title
Peach Bottom to Graceton (PECO Portion) – New 500kV Line
Description
Peach Bottom to Graceton (PECO Portion) – New 500kV Line. New rating: 4503 MVA SN/ 5022 MVA SE. This is a baseline identified for the announced Brandon Shores deactivation.
Cost Information
Time Estimate
Oct 23 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3780.4
Type
Load Flow
TO
BGE
RTEP ID / TO ID
b3780.4
Title
Peach Bottom to Graceton (BGE Portion) – New 500kV Line
Description
New rating: 4503 MVA SN/ 5022 MVA SE. This is a baseline identified for the announced Brandon Shores deactivation.
Cost Information
Time Estimate
Dec 31 2028

ContingentTopology Changing

Note 1: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

Note 2: This topology changing reinforcement was developed by the transmission owner and modeled in PJM analysis to address cycle overload(s). A flowgate that this project contributed to was identified as requiring this topology reinforcement.

FacilityContingency
CNASTONE-PCHBTM1S 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTNGHM-NOTTREAC 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
NOTTREAC-PCHBTMTP 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTM1N-CHAN 500.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
PCHBTMTP-COOPER2 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.
COOPER-GRACETON 230.0 kV Ckt 1 line(Any)
No new ratings for this Flowgate.

System Reinforcement: b3737.37
Type
Load Flow
TO
LS Power
RTEP ID / TO ID
b3737.37
Title
Silver Run-Hope Creek 230kV Expansion (Projected ISD 6/1/2029)
Description
Add a third set of submarine cables, rerate the overhead segment, and upgrade terminal equipment to achieve a higher rating for the Silver Run-Hope Creek 230 kV line. Disclaimer: B3737.37 will be cancelled once FERC accepts the Mutual Termination Agreement (MTA) of the SAA with NJ (MTA is under FERC Docket No. ER26-2994) . This baseline upgrade will be replaced with a network upgrade in Phase III once a detailed evaluation is completed by LS power.
Cost Information
Time Estimate
Dec 31 2028

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A1364.0 MVA
(All)B1614.0 MVA

System Reinforcement
Type
Load Flow
TO
PSEG
RTEP ID / TO ID
(Pending) / PSEG Rating
Title
PSEG terminal equipment WE 1697 MVA
Description
PSEG terminal equipment winter emergency rating is 1697 MVA.
Total Cost ($USD)
$0
Discounted Total Cost ($USD)
$0
Allocated Cost ($USD)
$0
Time Estimate
TBD

Note: This reinforcement is fictitious and will not be cost allocated to projects. It is listed for information purposes only.

FacilityContingency
HOPE CREEK-SILVER RUN 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
WINB1697.0 MVA

System Reinforcement: b3907.3
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3907.3
Title
Reconductor 2.12 miles of North Philadelphia to Waneeta 230 kV line including terminal equipment
Description
Reconductor 2.12 miles of North Philadelphia to Waneeta 230 kV line including terminal equipment
Cost Information
Time Estimate
Jun 01 2029

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
N PHILA-WANEETA2 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A731.0 MVA
(All)B885.0 MVA
WINA822.0 MVA
WINB978.0 MVA

System Reinforcement: b3907.2
Type
Load Flow
TO
PECO
RTEP ID / TO ID
b3907.2
Title
Rebuild Richmond - Waneeta 230 kV line
Description
Richmond to Waneeta 230kV Line: Rebuild entire 0.95 miles of existing UGT, and rebuild entire 2.23 miles of existing OHT
Cost Information
Time Estimate
Jun 01 2029

Contingent

Note: Although AH1-260 may not presently have cost responsibility for this upgrade, AH1-260 may need this upgrade in-service to be deliverable to the PJM system. If AH1-260 desires to come into service prior to completion of the upgrade, the Project Developer will need to request PJM to perform an interim study to determine if they would be deliverable for all or a portion of their output for each delivery year until the upgrade is complete.

FacilityContingency
WANEETA3-RICHMOND35 230.0 kV Ckt 1 line(Any)
Rating SetRating TypeRating Value
(All)A1245.0 MVA
(All)B1543.0 MVA
WINA1535.0 MVA
WINB1754.0 MVA

Conversion from Impacts into Topology or Eliminated Reinforcements into Region Topology Contingent Reinforcements for AH1-260


AH1-260 Contributions into Topology or Eliminated Reinforcements:
TypeTORTEP ID / TO IDTitleTopo or ElimMW ImpactPercent AllocationCategoryAllocated Cost ($USD)
Load FlowBGEb3780.5Build Solley Road substation + Statcom (Projected ISD 12/31/2028)Topology-0.0%Contingent$0
Load FlowBGEb3780.6Build Granite substation + Statcom (Projected ISD 12/31/2028)Topology-0.0%Contingent$0
Load FlowPEPCOb3780.11Brighton Statcom and Capacitor (Projected ISD 12/31/2028)Topology-0.0%Contingent$0
Load FlowBGEb3780.7Build new Batavia Road substation (Projected ISD 12/31/2028)Topology-0.0%Contingent$0
Load FlowBGEb3780.8Graceton 500 kV substation expansion (Projected ISD 12/31/2028)Topology-0.0%Contingent$0
Load FlowBGEb3780.9Graceton to Batavia Road 230 kV double circuit pole line (Projected ISD 12/31/2028)Topology-0.0%Contingent$0
Load FlowBGEb3780.13Batavia Road to Riverside 230 kV reconductorTopology-0.0%Contingent$0
Load FlowPECOb3780.15Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV subTopology-0.0%Contingent$0
Load FlowPECOb3780.17Cut in 5012 Peach Bottom-Conastone 500 kV line into North Delta 500/230 kV sub (Transource)Topology-0.0%Contingent$0
Load FlowPECOb3780.1Peach Bottom North upgrades – substation work (Projected ISD 12/31/2028)Topology-0.0%Contingent$0
Load FlowPECOb3780.14Reconfigure Cooper transmission feeds by establishing new Cooper-North Delta 230 kV line and rerouting existing transmissions lines by Cooper.Topology-0.0%Contingent$0
Load FlowPECOb3780.16Terminate new Cooper-North Delta 230 kV line (Transource Scope) at North Delta 230 kVTopology-0.0%Contingent$0
Load FlowPECOb3737.47Build New North Delta 500 kV substation (Four bay breaker and half configuration)Topology-0.0%Contingent$0
Load FlowBGEb3800.37Replace terminal equipment limitations at Conastone 500 kV - on the (existing Peach Bottom-Conastone) or (new Graceton-Conastone) 500 kV line (Projected ISD 12/31/2030)Topology-0.0%Contingent$0
Load FlowBGEb3800.34Rebuild 5012 (existing Peach Bottom-Conastone) (new Graceton-Conastone) 500 kV and cut into North Delta 500kV (Projected ISD 12/31/2030)Topology-0.0%Contingent$0
Load FlowPECOb3800.35Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton PECO) 500 kV (Projected ISD 12/1/2030)Topology-0.0%Contingent$0
Load FlowBGEb3800.36Rebuild 5012 (existing Peach Bottom-Conastone) (new North Delta-Graceton BGE) 500 kV (Projected ISD 12/31/2030)Topology-0.0%Contingent$0
Load FlowPECOb3800.52Reconfigure Peach Bottom North and South 500 kV yards (Projected ISD 12/1/2030)Topology-0.0%Contingent$0
Load FlowPECOb3800.45North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (PECO work).Topology-0.0%Contingent$0
Load FlowPECOb3800.50North Delta 500 kV termination for the Rock Springs 500 kV line (5034/5014 line) (Transource work).Topology-0.0%Contingent$0
Load FlowPEPCOb3800.46North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (PECO work).Topology-0.0%Contingent$0
Load FlowPECOb3800.51North Delta 500 kV termination for the new Peach Bottom-North Delta 500 kV line (Transource work).Topology-0.0%Contingent$0
Load FlowBGEb3800.29High Ridge termination for the North Delta-High Ridge 500 kV line (Projected ISD 12/31/2030)Topology-0.0%Contingent$0
Load FlowPECOb3800.31Build new North Delta-High Ridge 500 kV line - PECO Portion (Projected ISD 12/1/2030)Topology-0.0%Contingent$0
Load FlowPECOb3800.44North Delta termination for the North Delta-High Ridge 500 line (PECO work).Topology-0.0%Contingent$0
Load FlowPECOb3800.48North Delta termination for the North Delta-High Ridge 500 line (Transource work).Topology-0.0%Contingent$0
Load FlowBGEb3800.32Build new North Delta-High Ridge 500 kV line - BGE Portion (Projected ISD 12/31/2030)Topology-0.0%Contingent$0
Load FlowBGEb3800.26Build High Ridge 500 kV substation - Three bay breaker and half configuration (Projected ISD 12/31/2030)Topology-0.0%Contingent$0
Load FlowBGEb3800.27High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) - Waugh Chapel side (Projected ISD 12/31/2030)Topology-0.0%Contingent$0
Load FlowBGEb3800.28High Ridge 500 kV substation (cut into Brighton-Waugh Chapel 500 kV line) -Brighton side (Projected ISD 12/31/2030)Topology-0.0%Contingent$0
Load FlowBGEb3800.30High Ridge - Install two 500/230 kV transformers (Projected ISD 12/31/2030)Topology-0.0%Contingent$0
Load FlowPECOb3800.47Build new Peach Bottom South-North Delta 500 kV line (Projected ISD 12/1/2030)Topology-0.0%Contingent$0
Load FlowPECOb3800.42Peach Bottom 500kV North bus upgrade (Projected ISD 12/1/2030)Topology-0.0%Contingent$0
Load FlowPECOb3800.49North Delta 500 kV termination for the Calpine generator (Calpine/Transource work).Topology-0.0%Contingent$0
Load FlowBGEb3800.33Replace terminal equipment limitations at Brighton 500 kV - on the existing Brighton-Waugh Chapel 500 kV (5053) or new Brighton-High Ridge 500 kV.Topology-0.0%Contingent$0
Load FlowPECOb3780.2Peach Bottom to Graceton (PECO Portion) – New 500kV LineTopology-0.0%Contingent$0
Load FlowBGEb3780.4Peach Bottom to Graceton (BGE Portion) – New 500kV LineTopology-0.0%Contingent$0
Contributions into Topology or Eliminated Reinforcement Total:$0
AH1-260 Contingent Region Topology Upgrades:
TORTEP IDTitleCategoryAllocated Cost ($USD)
Region Topology Upgrade Total:$0

Attachments

AH1-260 One Line Diagram

AH1-260 One Line Diagram.jpg
The state in which the generator or merchant transmission facility is located.
The Transmission Owner of the facility where the New Service Request project interconnects to the transmission system.