PPL Technical Standards

The PPL Electric Utilities’ documents listed below address the requirements for the interconnection of generation, transmission, and end user facilities to the PPL Electric Utilities’ transmission system in Pennsylvania. All interconnected facilities must meet these requirements.

If the developer wishes to investigate or pursue the "Option to Build”, there are additional standards and requirements with which the developer must comply. These additional requirements can be made available to the developer upon request.

Date
New Service Customer Welcome Packet PDF
7.30.2018
Parellel Generation Protection Requirements:
Requirement (230kV & 500kV) PDF
Requirements (69 kV & 138 kV) PDF

8.16.2019
1.31.2018
Point of Contact Requirements (69 kV & 138 kV) PDF
8.16.2019
Point of Interconnection Diagram: 69 & 138 kV | 230 & 500 kV PDF
2.1.2018

Option to Build Standards (230kV & 500kV)
Date
IPP 230 kV & 500 kV One-line Diagram PDF
3.19.2019
Base Document (2-082) PDF
3.12.2019
Attachment 1: Technical Requirements (2-083) PDF
12.19.2017
Attachment 2: Bulk Power Delivery Facilities (2-084) PDF
3.12.2019
Attachment 3: Relay & Control Facilities (2-085) PDF
9.11.2017
Attachment 4: Responsibilities Checklist (2-086) PDF
12.19.2017
List of Approved Contractors PDF
6.12.2019
Attachment 6: OTB Approved Vendors (2-088) PDF
7.27.2017
Siting Requirements for Independent Power Producers PDF
4.11.2019
Real Estate, Right of Way Acquisition & Permitting Requirements & Procedures for Independent Power Producers PDF  8.2.2018