Committees & Groups

Planning Committee

The Planning Committee (PC) is established under the Operating AgreementPDF and has the responsibility to review and recommend system planning strategies and policies as well as planning and engineering designs for the PJM bulk power supply system to assure the continued ability of the member companies to operate reliably and economically in a competitive market environment. Additionally, the PC makes recommendations regarding generating capacity reserve requirement and demand-side valuation factors.

View issues the PC is currently tracking.

Chair: Paul McGlynn
Secretary:
 Susan McGill

RosterPDF

 



Training Video

Community User GuidePDF

Date
CharterPDF
8.12.2016

Meeting Materials

 11.9.2017 - Planning Committee Meeting

11.2.2017 Agenda  PDF
11.2.2017 Agenda  DOC
11.2.2017 Draft Minutes - PC - 10.12.2017  PDF
11.9.2017 Item 3A - Designated Entity Design Standards Task Force Presentation  PDF
11.2.2017 Item 3B - DECSTF Document  PDF
11.2.2017 Item 3C - DEDSTF Document  PDF
11.2.2017 Item 4A - Transmission Service & Upgrade Requests Presentation  PDF
11.2.2017 Item 4B - Definitions & TOC  PDF
11.2.2017 Item 4C - Tariff II - III  PDF
11.8.2017 Item 4D - 29.2A Determination of ATC New Section  PDF
11.2.2017 Item 4E - Part IV Interconnections with Transmission & Preamble  PDF
11.2.2017 Item 4F - 36.3 Upgrade Feasibility Study New Section  PDF
11.2.2017 Item 4G - 200 Applicability  PDF
11.2.2017 Item 4H - 203.1 Cost Responsibility  PDF
11.2.2017 Item 4I - 204.1 Completed Applications  PDF
11.2.2017 Item 4J - 204.2 Upgrade  PDF
11.2.2017 Item 4K - 205.2 Scope of Studies  PDF
11.2.2017 Item 4I - Attachment N 1  PDF
11.2.2017 Item 4M - Upgrade Request Form Template Attachment EE  PDF
11.2.2017 Item 4N - Attachment FF  PDF
11.2.2017 Item 4O - Attachment MM New Form  PDF
11.8.2017 Item 5 – Market Efficiency Problem Statement & Issue Charge  PDF
11.6.2017 Item 6 - Light Load Analysis Update  PDF
11.8.2017 Item 7 – Grid Resilience in System Planning  PDF
11.2.2017 Item 8 - Planning Modeling Update  PDF
11.2.2017 Item 9 - Review of PJM Summer 2017 Loads  PDF
11.2.2017 Item 10 - NRC Update Slides for Committees  PDF
11.2.2017 Item 11 - Furnace Run Substation  PDF
11.2.2017 Item 12 - Conemaugh Rice Substation  PDF
11.10.2017 PC Posting Report Card  XLS

 11.3.2017 - Special Planning Committee Meeting: CETO/CETL Education

 10.12.2017 - Planning Committee Meeting

10.9.2017 Agenda  PDF
10.9.2017 Agenda  DOC
9.20.2017 Draft Minutes - PC - 9.14.2017  PDF
10.5.2017 Item 3 - 2017 IRM Study  PDF
10.6.2017 Item 3A - 2017 PJM Reserve Requirement Study  PDF
10.5.2017 Item 4A - Executive Summary Manual 14B  PDF
10.5.2017 Item 4B - Manual 14B Changes  PDF
10.5.2017 Item 4C - Manual 14B V140 Clean  PDF
10.5.2017 Item 4D - Manual 14B V140 Redline  PDF
10.5.2017 Item 5A - Executive Summary Manual 19 Changes  PDF
10.5.2017 Item 5B - Manual 19 Changes  PDF
10.5.2017 Item 5C - Manual 19 V32 Redline  PDF
10.5.2017 Item 6A - Transmission Service & Upgrade Requests  PDF
10.5.2017 Item 6B - Definitions & TOC Draft Redline  PDF
10.5.2017 Item 6C - Tariff II III Draft Redline  PDF
10.5.2017 Item 6D - 29.2A Determination of ATC Draft Redline  PDF
10.5.2017 Item 6E - Part IV Interc w Trans & Preamble Draft Redline  PDF
10.5.2017 Item 6F - 36.3 Upgrade Feasibility Study Draft Redline  PDF
10.5.2017 Item 6G - 200 Applicability Draft Redline  PDF
10.5.2017 Item 6H - 203.1 Cost Responsibility Draft Redline  PDF
10.5.2017 Item 6I - 204.1 Completed Applications Draft Redline  PDF
10.5.2017 Item 6J - 204.2 Upgrade Draft Redline  PDF
10.5.2017 Item 6K - 205.2 Scope of Studies Draft Redline  PDF
10.5.2017 Item 6L - Attachment N-1 Draft Redline  PDF
10.5.2017 Item 6M - Upgrade Request Form Template - Attachment EE Draft Redline  PDF
10.5.2017 Item 6N - Attachment FF Draft Redline  PDF
10.5.2017 Item 6O - Attachment MM Draft Redline  PDF
10.5.2017 Item 7A - Designated Entity Design Standards Task Force  PDF
10.5.2017 Item 7B - Designated Entity Design Standards Task Force Document Version 2.0 Redline  PDF
10.5.2017 Item 7C - Designated Entity Design Standards Task Force Document Version 2.0 Clean  PDF
10.9.2017 Item 9 - Grid Resilience in System Planning  PDF
10.5.2017 Item 10 - Planning Modeling Update  PDF
10.5.2017 Item 11 - N&RC Update  PDF
10.9.2017 Item 12 - PJM.com Update  PDF
10.5.2017 Informational - Manual 03 Changes  PDF
10.5.2017 Informational - Manual 03 Executive Summary  PDF
10.5.2017 Informational - Manual 03 V52 Non-CEII Version Redline  PDF
10.12.2017 PC Posting Report Card  XLS

 8.30.2017 - Special PC: CETL Procedural Updates Meeting

 7.18.2017 - Special PC Session: Consideration of Cost Cap/Containment Provisions for Competitive Proposals

 7.13.2017 - Planning Committee Meeting

7.10.2017 Agenda  PDF
7.10.2017 Agenda  DOC
8.10.2017 Minutes  PDF
6.14.2017 Item 2 – Draft Minutes – PC – 6.8.2017  PDF
7.10.2017 Item 3 – Load Model Selection  PDF
7.6.2017 Item 4A – Manual 14B & Operating Agreement Updates – TEAC Redesign  PDF
7.6.2017 Item 4B – Draft Manual 14B – Redline  PDF
7.6.2017 Item 4C – Draft Manual 14B – Clean  PDF
7.6.2017 Item 4D – Manual 14B – Executive Summary  PDF
7.6.2017 Item 5A – TO-TOP Matrix Version 11 Updates  PDF
7.6.2017 Item 5B – Draft PJM TO-TOP Matrix Version 11  PDF
7.6.2017 Item 5C – Draft PJM TO-TOP Matrix Version 11  XLS
7.10.2017 Item 6A – Manual 14A Updates  PDF
7.6.2017 Item 6B – Draft Manual 14A – Redline  PDF
7.6.2017 Item 6C – Draft Manual 14A – Clean  PDF
7.6.2017 Item 6D – Manual 14A – Executive Summary  PDF
7.10.2017 Item 7A - Manual 14B Updates  PDF
7.10.2017 Item 7B - Draft Manual 14B - Redline  PDF
7.10.2017 Item 7C - Draft Manual 14B - Clean  PDF
7.10.2017 Item 7D - Manual 14B - Executive Summary  PDF
7.10.2017 Item 8 – Grid Resilience in System Planning  PDF
7.10.2017 Item 9 – Winter Season Resource Adequacy & Capacity Requirements  PDF
7.10.2017 Item 10 - Class Average Wind and Solar Capacity Factors  PDF
7.10.2017 Item 11 - Geomagnetic Disturbance (GMD) Update  PDF
7.10.2017 Item 12 - TPL-001-4 Spare Equipment Strategy Update  PDF
7.10.2017 Item 13 - Planning Community Tool Update  PDF
7.6.2017 Item 14 – NERC & Regional Coordination Update  PDF
7.11.2017 Item 15 – PPL EU – New 500 kV Line Designation  PDF
8.10.2017 PC Posting Report Card  XLS

 6.8.2017 - Planning Committee Meeting

6.5.2017 Agenda  PDF
6.5.2017 Agenda  DOC
5.11.2017 Item 2 - Draft Minutes - PC - 5.4.2017  PDF
6.1.2017 Item 3A - PJM Manual 14F  PDF
6.1.2017 Item 3B - Draft New PJM Manual 14F - Redline  PDF
6.1.2017 Item 3C - Draft New PJM Manual 14F - Clean  PDF
6.1.2017 Item 3D - Manual 14F - Executive Summary  PDF
6.1.2017 Item 4A - Designated Entity Design Standards Task Force Presentation  PDF
6.1.2017 Item 4B - Designated Entity Design Standards Task Force Document  PDF
6.2.2017 Item 5A – Manual 14C Revisions  PDF
6.2.2017 Item 5B – Manual 14C Revisions – Redline  PDF
6.2.2017 Item 5C – Manual 14C Revisions – Executive Summary  PDF
6.1.2017 Item 6A - Reserve Requirement Study (RRS) Assumptions  PDF
6.1.2017 Item 6B - RRS Assumptions Letter 2017  PDF
6.1.2017 Item 7A - Manual 20 Updates  PDF
6.1.2017 Item 7B - Manual 20 - Redline  PDF
6.1.2017 Item 7C - Manual 20 - Executive Summary  PDF
6.1.2017 Item 8 - PJM Load Model Selection for 2017 RRS  PDF
6.7.2017 Item 9A - Manual 14B & Operating Agreement - TEAC Redesign  PDF
6.7.2017 Item 9B - Draft Manual 14B - Redline  PDF
6.7.2017 Item 9C - Draft Manual 14B - Clean  PDF
6.5.2017 Item 9D - Manual 14B - Executive Summary  PDF
6.5.2017 Item 10 - Manual 14A Updates  PDF
6.5.2017 Item 11 - Light Load Reliability Criteria Update  PDF
6.2.2017 Item 12 – Grid Resilience in System Planning  PDF
6.2.2017 Item 13 – CETL Calculation Discussion  PDF
6.1.2017 Item 15 - NERC & Regional Coordination Update  PDF
6.1.2017 Item 16 - AEP FERC Form 715 Updates  PDF