Committees & Groups

Planning Committee

The Planning Committee (PC) is established under the Operating AgreementPDF and has the responsibility to review and recommend system planning strategies and policies as well as planning and engineering designs for the PJM bulk power supply system to assure the continued ability of the member companies to operate reliably and economically in a competitive market environment. Additionally, the PC makes recommendations regarding generating capacity reserve requirement and demand-side valuation factors.

View issues the PC is currently tracking.

Chair: Paul McGlynn
Secretary: Bridgid Cummings

RosterPDF

Date
CharterPDF
8.12.2016

Meeting Materials

 6.8.2017 - Planning Committee Meeting

 5.24.2017 - Special PC Session: Consideration of Cost Cap/Containment Provisions for Competitive Proposals

 5.4.2017 - Planning Committee Meeting

5.2.2017 Agenda  PDF
5.2.2017 Agenda  DOC
4.19.2017 Item 2 – Draft Minutes – PC – 4.13.2017  PDF
5.3.2017 Item 3A – Less Than $5M Queue Cost Allocation & Alternate Queue  PDF
5.3.2017 Item 3B – Draft Manual 14A – Less than $5M Cost Allocation – Redline  PDF
5.3.2017 Item 3C – Draft Tariff Language – Less than $5M Cost Allocation – Redline  PDF
5.3.2017 Item 3D – Draft Manual 14A – Alternate Queue – Redline  PDF
5.3.2017 Item 3E – Draft Tariff Language – Alternate Queue – Redline  PDF
5.3.2017 Item 3F – Manual 14A – Executive Summary  PDF
4.28.2017 Item 4A – Manual 14F – Competitive Planning Process  PDF
5.1.2017 Item 4B – Draft Manual 14F – Redline  PDF
5.1.2017 Item 4C – Draft Manual 14F – Clean  PDF
4.28.2017 Item 4D – Manual 14F – Executive Summary  PDF
4.28.2017 Item 5A – DEDSTF Presentation  PDF
4.28.2017 Item 5B – DEDSTF Protection Subgroup Document  PDF
4.28.2017 Item 5C – DEDSTF Lines Subgroup Document  PDF
5.1.2017 Item 5D – DEDSTF Substation Subgroup Document  PDF
4.28.2017 Item 6A – Manual 14C Revisions  PDF
4.28.2017 Item 6B – Manual 14C Revisions – Redline  PDF
4.28.2017 Item 6C – Manual 14C Revisions – Executive Summary  PDF
5.1.2017 Item 7A – Reserve Requirement Study Assumptions  PDF
5.1.2017 Item 7B – 2017 RRS Assumptions Letter  PDF
5.2.2017 Item 8A – Manual 20 Updates  PDF
5.2.2017 Item 8B – Manual 20 – Redline  PDF
5.2.2017 Item 8C – Manual 20 – Executive Summary  PDF
5.1.2017 Item 9 – Winter Season Resource Adequacy & Capacity Requirements  PDF
5.2.2017 Item 10 - 2017 RTEP Proposal Window Update  PDF
5.1.2017 Item 11 - Multiregional Modeling Working Group & MOD-032 Update  PDF
4.28.2017 Item 12 – PJM Interconnection Queue Status Update  PDF
4.28.2017 Item 13 – NERC and Regional Coordination Update  PDF
4.28.2017 Item 14 – Linwood RAS Removal  PDF
5.4.2017 Information Only – CETL Calculation Discussion Timeline  PDF
5.4.2017 PJM Modeling and Support MMWG Schedule 2017  XLS
5.5.2017 PC Posting Report Card  XLS

 4.13.2017 - Planning Committee Meeting

4.7.2017 Agenda  PDF
4.7.2017 Agenda  DOC
5.4.2017 Minutes  PDF
4.7.2017 Information Only - Draft Manual 3 - Updates  PDF
4.7.2017 Informational Only - Manual 3 - Executive Summary  PDF
4.7.2017 Information Only - Manual 3 - Updates  PDF
3.15.2017 Item 2 - Draft Minutes - PC - 3.9.2017  PDF
4.7.2017 Item 3A - Manual 14B - Updates  PDF
4.7.2017 Item 3B - Draft Manual 14B - Redline  PDF
4.7.2017 Item 3C - Draft Manual 14B - EE Edits Only - Redline  PDF
4.7.2017 Item 3D - Draft Manual 14B - Clean  PDF
4.7.2017 Item 3E - Manual 14B - Executive Summary  PDF
4.7.2017 Item 4A - Manual 14F - Competitive Planning Process  PDF
4.7.2017 Item 4B - Manual 14F - Redline  PDF
4.7.2017 Item 4C - Manual 14F - Clean  PDF
4.7.2017 Item 4D - Manual 14F - Executive Summary  PDF
4.7.2017 Item 5A - DEDSTF Presentation  PDF
4.7.2017 Item 5B - DESTF Protection Subgroup Document  PDF
4.7.2017 Item 5C - DEDSTF Lines Subgroup Document  PDF
4.10.2017 Item 5D – DEDSTF Substation Subgroup Document  PDF
4.7.2017 Item 6A – Less than $5M Queue Cost Allocation & Alternate Queue  PDF
4.7.2017 Item 6B – Draft Manual 14A – Less than $5M Cost Allocation – Redline  PDF
4.7.2017 Item 6C – Draft Tariff Language – Less than $5M Cost Allocation – Redline  PDF
4.7.2017 Item 6D – Draft Manual 14A – Alternate Queue – Redline  PDF
4.7.2017 Item 6E – Draft Tariff Language – Alternate Queue – Redline  PDF
4.7.2017 Item 6F – Manual 14A – Executive Summary  PDF
4.7.2017 Item 9 - EQSTF Tariff Clean Up  PDF
4.7.2017 Item 10 - UCSA Definitions Change  PDF
4.10.2017 Item 11 - CETL Calculation Discussion  PDF
4.11.2017 Item 12A – TEAC Redesign Update  PDF
4.11.2017 Item 12B – 12 Month RTEP Cycle Structure & Timing  PDF
4.11.2017 Item 12C – 18 Month RTEP Cycle Structure & Timing  PDF
4.10.2017 Item 13 – Planning Community Tool  PDF
4.10.2017 Item 14 – MMWG & MOD-032 Update  PDF
4.7.2017 Item 15 - TO Load Forecasting  PDF
4.7.2017 Item 16 - NERC & Regional Coordination Update  PDF
4.7.2017 Item 17 - PPL Transmission Planning Criteria Update  PDF
4.7.2017 Item 18 - ITCI Planning Criteria  PDF
4.7.2017 Item 19 - BGE Remedial Action Scheme Retirement  PDF
4.7.2017 Item 20 - Automatic Sectionalizing Schemes  PDF
4.7.2017 Item 21 - Manual 14D - Solar Slides  PDF
4.10.2017 Item 21B - Proposed Tariff Changes - Solar  PDF
4.13.2017 PC Posting Report Card  XLS
5.5.2017 Information Only - Manual 03v451 Updates  PDF
5.5.2017 Information Only - Manual 03v49 – Draft Redline  PDF
5.5.2017 Information Only - Manual 03v51 - Executive Summary  PDF

 11.3.2016 - Planning Committee Meeting

11.7.2016 Agenda  PDF
11.7.2016 Agenda  DOC
12.15.2016 Minutes  PDF
10.13.2016 Draft Minutes – PC - 10.6.2016  PDF
10.28.2016 Item 3A – Manual 14B Updates  PDF
10.28.2016 Item 3B – Manual 14B Updates – Redline  PDF
10.28.2016 Item 3C – Manual 14B Updates – Clean  PDF
10.28.2016 Item 3D – Executive Summary – Manual 14B  PDF
10.28.2016 Item 4A – Manual 21 Updates  PDF
10.28.2016 Item 4B – Manual 21 Updates – Redline  PDF
10.28.2016 Item 4C – Executive Summary – Manual 21  PDF
10.28.2016 Item 5A – New Service Request Cost Allocation  PDF
10.28.2016 Item 5B – Manual 14A Updates – New Service Request Cost Allocation  PDF
10.28.2016 Item 5C – Proposed Tariff Language – New Service Request Cost Allocation  PDF
10.28.2016 Item 5D – Executive Summary – Manual 14A Changes  PDF
10.28.2016 Item 6A – TO-TOP Matrix  PDF
10.28.2016 Item 6B – Draft TO-TOP Matrix  PDF
10.28.2016 Item 7A – Winter Weekly Reserve Target Update  PDF
10.28.2016 Item 7B – Winter Weekly Reserve Target  PDF
10.28.2016 Item 8A – Manual 14C  PDF
10.28.2016 Item 8B – Manual 14C Proposed Tie Line Language  PDF
10.28.2016 Item 8C – Executive Summary – Manual 14C   PDF
11.3.2016 Item 9 - System Planning Modeling Update  PDF
10.28.2016 Item 12A – PJM Market Efficiency Proposal Selection Guidelines  PDF
10.28.2016 Item 12B – Guidelines for Market Efficiency Projects Selection Process  PDF
10.28.2016 Item 13 – Operations & Planning Audit Committee Updates  PDF
10.28.2016 Item 14 – NERC & Regional Coordination Update  PDF
10.31.2016 Item 15 - PJM NYISO Wheel Replacement Update  PDF
11.4.2016 PC Posting Report Card  XLS

 10.18.2016 - PC: New Service Request Study Methods

 10.6.2016 - Planning Committee Meeting

10.3.2016 Agenda  PDF
10.3.2016 Agenda  DOC
11.7.2016 Minutes  PDF
9.29.2016 Item 2 - Draft Minutes - PC - 9.15.2016  PDF
9.29.2016 Item 3A – Manual 14A Updates & Tariff References  PDF
9.29.2016 Item 3B – Draft Manual 14A – Redline  PDF
9.29.2016 Item 3C- Draft Manual 14A – Clean  PDF
9.29.2016 Item 3D – Executive Summary – Manual 14A  PDF
9.30.2016 Item 4A - Manual 14C Updates  PDF
10.6.2016 Item 4B - Draft Manual 14C - Redline  PDF
9.30.2016 Item 4C - Executive Summary - Manual 14C Changes  PDF
10.4.2016 Item 5A – 2016 IRM Study Results  PDF
10.3.2016 Item 5B – 2016 PJM Reserve Requirement Study  PDF
9.30.2016 Item 6 - Relay Subcommittee Charter - Redline  PDF
9.29.2016 Item 7A – Manual 14B Updates  PDF
9.30.2016 Item 7B – Manual 14B Updates – Redline  PDF
9.30.2016 Item 7C – Manual 14B Updates – Clean  PDF
9.29.2016 Item 7D – Executive Summary – Manual 14B  PDF
9.29.2016 Item 8A - Manual 21 Update  PDF
9.29.2016 Item 8B – Draft Manual 21 Version 12 – Redline  PDF
9.30.2016 Item 8C - Executive Summary - Manual 21  PDF
10.3.2016 Item 9A - New Service Request Cost Allocation  PDF
10.3.2016 Item 9B - Manual 14A Updates - New Service Request Cost Allocation  PDF
10.3.2016 Item 9C - Proposed Tariff Language - New Service Cost Allocation  PDF
10.3.2016 Item 9D - Executive Summary - Manual 14A Changes  PDF
9.29.2016 Item 10 – PJM Definitions Clean Up Project  PDF
10.4.2016 Item 11 - System Planning Modeling Update  PDF
9.29.2016 Item 13 – NERC Reliability Standards Update – GMD Events  PDF
9.30.2016 Item 14 - NERC & Regional Coordination Update  PDF