Issue Details

Transmission Replacement Processes

With reduced load growth and emerging distributed technologies, one of the primary drivers for new transmission investment will be replacement of aging transmission infrastructure. To date, roughly $5.5 B has been identified in PJM and more is expected.Recently, aging infrastructure projects are appearing in the PJM Regional and Local Planning forums. Some Transmission Owners have developed detailed criteria to assess end of life projects, memorialized this criteria in their FERC Form 715, which makes this criteria a part of the TO planning criteria and thus PJM planning criteria. Others have not developed published criteria and propose to address end of life facilities as Supplemental Projects. End of Life facilities span the voltage spectrum from local to regional facilities. Uniform PJM-wide End of Life criteria and guidelines that Transmission Owners could apply to their facilities would improve the local and regional planning processes by providing transparency on the criteria, assumptions and models used to determine the need for and, if so, the scope of the replacement facility. It would provide stakeholders a meaningful opportunity to review and provide written comments on proposed End of Life facilities before the Local and Regional Plans are finalized. Additionally, this would provide PJM planning with improved certainty on the projects to be included in base case build outs, as well as assure a level playing field in competitive windows resulting in less retools and a clearer and more orderly planning process. Deliverables are expected to include changes to PJM Manual(s) as required to address recommendations from the groupOriginal group name: End of Life Senior Task Force.

Proposed Timeline

Issue initiated: 2.25.2016
Work begins: 5.9.2016
Target Completion: 7.26.2018
Actual Completion: TBD

Issue Details

Stakeholder Body Transmission Replacement Processes Senior Task Force
Facilitator Spatafore, Julia
Subject Matter Expert Barrett, Fran S.
Problem Statement/
Issue Charge First Read
1.28.2016
Issue Catalyst American Municipal Power, Inc (AMP), Old Dominion Electric Cooperative (ODEC), Dominion Virginia Power, LS Power, The PJM Industrial Customer Coalition, The PJM Public Power Coalition and ITC Mid-Atlantic Development
Issue Status Closed
Manual Changes No
  • Stakeholder Process Step

  • Completed Approved
  • Completed Education
  • Completed Interest
  • Completed Design
  • Completed Options
  • Completed Packages
  • Completed Consensus
  • Completed Review
  • Completed Completed