• Cover to Cover Periodic Review
• Changes made throughout:
◦ Grammar, Punctuation, Typo, Syntax Consistency, Term, Reference Updates
◦ Updated Outdated Hyperlinks and addition of hyperlinks
◦ Addition of clarifying words and phrases
◦ Deletion of duplicate material
◦ Paragraph Spacing
◦ Remove outdated references to DASR
• Section 2
◦ Added descriptor for Interface Prices at top of section
◦ Addition that notice of coming online for self scheduled resources is 20 minutes in Real-time only. (2.3.3)
◦ New paragraph detailing dual fuel offer guidance. (2.3.3.2)
◦ Clarification that unit specific values applies to Generation Capacity Resources (2.3.4.3)
◦ Removal of "congestion charges" term. (2.3.4A)
◦ Removed redundant sentence. (2.3.8)
◦ Removed reference to retired NSR Opportunity Cost. (2.5.2)
◦ Section Retired, moved to Manual 28, (2.12)
◦ Clarification of call-on language (2.14)
◦ Replacement of "station" with "maximum units online" (2.18.1)
◦ Clarification of the shortage condition to trigger PAI and Data Miner 2 location of data. (2.19)
• Section 4
◦ Clarification that any resource must be able to provide 0.1MW of reserve capability. (4.2.1)
◦ Additional language detailing use and duration of this exception request. (4.2.2.1)
◦ Clarification regarding self-scheduling for energy. (4.2.3)
◦ Clarification that units for shutdown cost are in $, not $/MWh. (4.2.3)
◦ Clarification of when reserve information is posted to Markets Gateway. (4.4.3)
◦ Clarification of flexible reserve posting in Markets Gateway. (4.4.3)
◦ Clarification that reserve data referenced is from pricing run. (4.4.3)
◦ Clarification that of action within 30 minutes "of the start of the event" (4.5.1)
◦ Rewrite of section to clarify assignments, shortfall charges, and penalties. (4.5.2)
• Section 5
◦ Additional language to define PJM InSchedule application. (5.2.2)
◦ Rewrite of section to reflect updated load forecasting process (5.2.3)
◦ Updated Energy Market Daily graphic to correct rebid period timing (5.2.4)
◦ Clarification of SPD outputs. (5.2.6)
◦ Updated graphic to reflect name change of PJM EES to PJM ExSchedule. (5.2.7)
• Section 10
◦ Update of Reserve definitions (10.2)
◦ New clarifying sentence on registering locations and removal of reference to DR Hub user guide. (10.2.2)
◦ Addition of data centers to examples of a Business Segment (10.2.2)
◦ Updated footnote references in table. (10.4.2)