Periodic cover-to-cover review
Section 1.2 Generator Commercial Naming Convention
- Clarified and provided additional guidance on acceptable Generating Facility naming
Section 2.3 Generator Market Remodel
- Added new section under the Responsibilities of Generation Owners section to detail the generator market remodel process.
Section 2.4 eDART Modeling
- Added new section under the Responsibilities of Generation Owners section to describe eDART modeling requirements previously covered in section 5.3.4 eDART.
Section 3.3 Voice Communication Requirements for Generating Entities
- Removed references to ring-down phone lines to generating entities
Section 5.3.3 PJM eRPM
- Renamed to PJM Capacity Exchange and removed references to eRPM
Section 5.3.4 eDART
- Removed the last two paragraphs from this section and moved it to the new section 2.4 eDART Modeling.
Section 5.4.4 Grid Accounting
- Replaced references to eRPM with Capacity Exchange
Section 5.7.2.7 eRPM account
- Renamed to Capacity Exchange account
Section 5.7.3 Process Timeline
- Corrected the duration of attaining PJM membership after all required paperwork has been signed and received by PJM from 60 to 90 days.
Section 7.3.1 Planned Outage
- Clarified that eDART tool is used for submitting Planned Outages
Section 7.3.2 Maintenance Outage
- Clarified applicability to all generation resources
Section 7.3.5 Fuel and Emissions Reporting
- Renamed section to Fuel Emissions and Operational Data Reporting
- Clarified requirements and necessity for responding to PJM data requests
Section 7.3.6 Generation Owner Periodic Tasks and Data Submittals
- Added new section with guidelines to assist Generation Owners tracking periodic tasks, testing and data submittals.
Section 8.2.1 Data Requirements for Wind Forecast Set Up
- Clarified language, including title of section, to indicate that data is required for forecasting when there is a change to a wind farm in addition to when a wind farm first comes online
Section 8.2.3 Real Time Meteorological Tower (or mutually agreed upon alternative source)
- Modified format of temperature unit in table to be consistent with other parameters
Section 8.2.6 Wind Power Forecast
- Modified names and descriptions of types of forecasts to reflect the manner in which PJM currently uses forecast products
Section 8.3 Forecast Data Usage
- Aligned names and descriptions of types of forecasts with changes made in 8.2.6
Section 9.1.1 Generator Deactivation Request
- Renamed to Generator Deactivation Notice
- Updated Black Start resource termination requirements to reflect current Tariff requirements
- Updated language to be consistent with current business practice
Section 9.1.2 Initial Analysis
- Renamed to Deactivation Analysis
- Updated language to be consistent with current business practice
Section 9.1.3 Analysis Results
- Updated language to be consistent with current business practice and to reflect current Tariff requirements
- Updated Black Start resource termination revenue impacts to reflect current Tariff requirements
Section 12.2.1 Data Requirements for Solar Forecast Set Up
- Clarified language, including title of section, to indicate that data is required for forecasting when there is a change to a solar park in addition to when a solar park first comes online
- Added language stating that solar parks with multiple components (e.g. multiple panel models) need to provide data for each component
- Modified list to separate Maximum Facility Output (MW) from AC installed capacity of each component (MW)
Section 12.2.2 Real Time Output
- Added clarifying language regarding criteria that require real-time output telemetry
- Expanded requirements for hybrids and collocated resources to apply to all combinations of solar and other resources in addition to solar and storage resources
Section 12.2.3 Real Time Meteorological Tower (or mutually agreed upon alternative source)
- Clarified that type of real-time irradiance data required is Plane of Array (POA) irradiance
- Modified format of temperature unit in table to be consistent with other parameters
Section 12.2.5 Solar Power Forecast
- Modified names and descriptions of types of forecasts to reflect the manner in which PJM currently uses forecast products
Section 12.3 Forecast Data Usage
- Aligned names and descriptions of types of forecasts with changes made in 12.2.5
Attachment N: Cold Weather Preparation Guideline and Checklist
- Update existing links and added links to additional industry guidance for generation resource cold weather preparation
- Added recommendation to create “Emergency Freeze Protection Kits” at various plant locations