Planning

As of 1:10 p.m. EPT

Competitive Planning Process
  • The PJM competitive planning process affords non-incumbent transmission developers an opportunity to participate in the regional planning and expansion of the PJM bulk electric system.
  • 2021 Window 1
     open7.2.2021  closed8.31.2021
    2021 SAA Proposal Window
     open4.15.2021  closed9.17.2021
    2020/21 Long-Term Window 1
     open1.11.2021 closed5.11.2021
    2020 Window 4
     open3.3.2021 closed4.2.2021
Planning News from Inside Lines
  • PJM Panelists Discuss Improving Regional Planning Processes at FERC
    At a Federal Energy Regulatory Commission workshop September 10, PJM experts shared experience and perspectives on the optimization of transmission technology. Five industry panels, moderated by FERC representatives, focused on incentivizing grid-enhancing technology for enhancements to the long-established cost of service ratemaking framework used to recover capital investment in transmission projects. Suzanne Glatz, Director, Strategic Initiatives […]
  • Potential Reforms for Transmission Planning, Cost Allocation and Generator Interconnection Discussed
    As the federal government advances potential policy to drive needed infrastructure investment, clarify climate strategies and meet the challenge of reliably integrating renewable resources, PJM has set out with stakeholders to articulate priorities and concerns as Interconnection Policy Workshops continue this fall. On Aug. 27, PJM and its stakeholders shared perspectives on reform for interconnection […]
Queued Generation Fuel Mix
As of 1:16 p.m. EPT
Total:
116,155 MW
Renewables:
63,402 MW
Generation Interconnection Requests by Fuel Type
As of 1:16 p.m. EPT
Queues Timeline
As of 7.30.2020 2:49 p.m. EPT
Active Studies
As of 1:11 p.m. EPT
Criteria & Guidelines