Planning

Most Recently Approved RTEP Updates
As of 2:18 p.m. EPT

Competitive Planning Process
  • The PJM competitive planning process affords non-incumbent transmission developers an opportunity to participate in the regional planning and expansion of the PJM bulk electric system.
  • 2024 RTEP Window 1
     open7.15.2024 closed9.13.2024
Planning News from Inside Lines
  • Asthana at OPSI: ‘We need capacity’
    Back in 2022, Manu Asthana arrived at the annual meeting of the Organization of PJM States with a message he has repeated frequently since then. Electricity demand was projected to grow like it had not in decades, generators were retiring at an accelerating rate, and their replacements were not being built at near the pace […]
  • PJM Provides Update on 2024 RTEP Window 1
    PJM briefed stakeholders Tuesday (Oct. 8) on the 2024 Regional Transmission Expansion Plan Window 1, which closed Sept. 17. Sami Abdulsalam, Director – Transmission Planning, updated the Transmission Expansion Advisory Committee (TEAC) with an overview of the major needs targeted by the RTEP window and details of the various projects proposed to meet them. The […]
Queued Generation Fuel Mix
As of 9:15 p.m. EPT
Total:
159,358 MW
Renewables:
81,311 MW
Generation Interconnection Requests by Fuel Type
As of 9:15 p.m. EPT
Cycle Timeline
As of 6.24.2024 7:42 a.m. EPT
Criteria & Guidelines