Planning

As of 3:21 p.m. EPT

Competitive Planning Process
  • The PJM competitive planning process affords non-incumbent transmission developers an opportunity to participate in the regional planning and expansion of the PJM bulk electric system.
  • 2021 Window 3
     open11.3.2021  closed12.8.2021
    2021 Window 2
     open11.3.2021  closed1.12.2022
    2021 Window 1
     open7.2.2021  closed8.31.2021
    2021 SAA Proposal Window
     open4.15.2021  closed9.17.2021
    2020/21 Long-Term Window 1
     open1.11.2021 closed5.11.2021
    2020 Window 4
     open3.3.2021 closed4.2.2021
Planning News from Inside Lines
  • PJM Annual Meeting 2022: Year in Review
    A PJM panel looked back at 2021 and ahead to the future of the electric industry at PJM’s Annual Meeting May 17, as the nation’s first grid operator marked its 95th year and the 25th year as an independent system operator. The meeting celebrated the official campus reopening since the onset of the COVID-19 pandemic […]
  • New Report Presents Road Map for Future Grid
    PJM has released a report outlining a vision for the grid of the future informed by examining how key industry trends and drivers could impact PJM and PJM’s transmission planning process. Grid of the Future: PJM’s Regional Planning Perspective (PDF) envisions a transmission system driven by decarbonization, renewables, public policy, a diverse resource mix and […]
Queued Generation Fuel Mix
As of 3:26 p.m. EPT
Total:
160,154 MW
Renewables:
78,884 MW
Generation Interconnection Requests by Fuel Type
As of 3:26 p.m. EPT
Queues Timeline
As of 2.15.2022 5:32 p.m. EPT
Active Studies
As of 3:26 p.m. EPT
Criteria & Guidelines