New Service Request Deposits

Agreement Type Readiness Deposit Study Deposit
Generating Facility $4,000 per MW is required.
The MW values used in the calculation is the greater of (1) and (2) specified in the application:
(1) MW energy (e.g., Maximum Facility Output)
(2) MW capacity (e.g., Capacity Interconnection Rights)

Study deposit required is as follows:

0 - 20MW  $75,000

> 20 - 50MW  $200,000

> 50 - 100MW  $250,000

> 100 - 250MW  $300,000

> 250 - 750MW — $350,000

> 750MW — $400,000

Merchant Transmission Facility Specifications $4,000 per MW is required.
The MW values used in the calculation is the greater of (1) and (2) specified in the application:
(1) MW energy (e.g., Maximum Facility Output)
(2) MW capacity (e.g., Capacity Interconnection Rights)

Study deposit required is as follows:

0 - 20MW — $75,000

> 20 - 50MW — $200,000

> 50 - 100MW — $250,000

> 100 - 250MW — $300,000

> 250 - 750MW — $350,000

> 750MW — $400,000

Surplus Interconnection Request   $10,000 plus $100 for each MW requested provided that the maximum total deposit shall not exceed $110,000.
Upgrade Application and Studies Agreement   A Study Deposit in the amount of $150,000 is required.