TO Connection The TO Connection tool serves as a suite for a select set of PJM sub-tools which PJM and its member Transmission Owners utilize in coordination with, or to provide awareness to, its member Transmission Owners. The TO Connection tool intended audience is transmission system operations/dispatcher focused, including internal PJM Dispatchers/Reliability Engineers, tool administrators, and PJM member Transmission Owner system operator staff directly involved in the underlying tool. Production: Sign In | Register Train: Sign In (LIMITED FUNCTIONALITY BEYOND LOGIN due to lack of upstream inputs) Release Notes TO Connection User Guide PDF CEII Requirements for Requesting Access Tools Post Contingency Local Load Relief Warning (PCLLRW) - Sub-tool utilized in the coordination of post-Contingency load shed plans (as part of Operating Plans) between PJM and impacted Transmission Owners (TO). Training Videos The below training was provided in 2014 and will be updated following the Q3 PCLLRW enhancements. Deficient Status WEB TO Connection/PCLLRW WEB Low Voltage PCLLRW WEB Valid Status WEB Stability Viewer - PJM Dispatchers utilize the Stability Viewer sub-tool as a logging and record-keeping tool for unit or area stability restrictions throughout PJM. PJM member Transmission Owners are provided visibility around the Stability Viewer sub-tool within the TO Connection tool as awareness around unit or area stability restrictions in the PJM footprint. Stability Viewer provides additional visibility to PJM Transmission Owners. Training Videos TO Connection & Stability Viewer Overviews WEB