Interconnection Process Subcommittee
The Interconnection Planning Subcommittee (IPS) is a subcommittee established by the Planning Committee (PC). The purpose of the IPS is to provide a stakeholder forum to investigate and resolve specific issues related to the interconnection process and associated agreements, governing documents and manuals. The interconnection process includes generation interconnections, merchant transmission interconnections, upgrade requests, and those requests seeking long-term firm transmission service that are evaluated in the planning process.
Chair: Ed Kovler
Secretary: Rebecca Gerber
During the meeting, if you are experiencing issues with connectivity or teleconference, please contact Meeting Support. For registration issues, contact PJM.
|
Date
|
|
|---|---|
| Charter PDF |
7.14.2022
|
| Developer Interconnection Process Reform FAQ |
|
Upcoming Meetings
|
Meeting
|
Date
|
Time
|
Attendance
|
|
|---|---|---|---|---|
|
Interconnection Process Subcommittee
Webex
|
1.26.2026
|
9:00 a.m. - 12:00 p.m. EPT
|
Open
|
|
|
Interconnection Process Subcommittee
Webex
|
2.23.2026
|
9:00 a.m. - 12:00 p.m. EPT
|
Open
|
|
|
Interconnection Process Subcommittee
Webex
|
3.30.2026
|
9:00 a.m. - 12:00 p.m. EPT
|
Upcoming
|
|
|
Interconnection Process Subcommittee
Webex
|
4.27.2026
|
9:00 a.m. - 12:00 p.m. EPT
|
Upcoming
|
|
|
Interconnection Process Subcommittee
Webex
|
5.26.2026
|
9:00 a.m. - 12:00 p.m. EPT
|
Upcoming
|
|
|
Interconnection Process Subcommittee
Webex
|
6.29.2026
|
9:00 a.m. - 12:00 p.m. EPT
|
Upcoming
|
Upcoming Meetings
|
Interconnection Process Subcommittee
Webex
1.26.2026
9:00 a.m. - 12:00 p.m. EPT
Open
|
|
Interconnection Process Subcommittee
Webex
2.23.2026
9:00 a.m. - 12:00 p.m. EPT
Open
|
|
Interconnection Process Subcommittee
Webex
3.30.2026
9:00 a.m. - 12:00 p.m. EPT
Upcoming
|
|
Interconnection Process Subcommittee
Webex
4.27.2026
9:00 a.m. - 12:00 p.m. EPT
Upcoming
|
|
Interconnection Process Subcommittee
Webex
5.26.2026
9:00 a.m. - 12:00 p.m. EPT
Upcoming
|
|
Interconnection Process Subcommittee
Webex
6.29.2026
9:00 a.m. - 12:00 p.m. EPT
Upcoming
|
Meeting Materials
12.18.2025 - Interconnection Process Subcommittee
| 12.15.2025 | Agenda PDF | |
| 12.15.2025 | Agenda-doc DOC | |
| 12.17.2025 | Item 02 - Draft Minutes - IPS - 11.24.2025 PDF | |
| 12.15.2025 | Item 03 - Cycle Schedule Update PDF | |
| 12.15.2025 | Item 04 - TC2 DP2 PSCAD Model Requirements PDF | |
| 12.15.2025 | Item 05 - Education on PJM Provisional Service - Interim Deliverability PDF |
11.24.2025 - Interconnection Process Subcommittee
| 11.19.2025 | Agenda PDF | |
| 11.19.2025 | Agenda-doc DOC | |
| 11.19.2025 | Item 02 - Draft Minutes - IPS - 10.10.2025 PDF | |
| 11.19.2025 | Item 03 - Cycle Schedule Update PDF | |
| 11.21.2025 | Item 04 - TC2 DP1 Question and Answer Session PDF | |
| 11.19.2025 | Item 05A - Expansion of Provisional Service - Problem Statement PDF | |
| 11.19.2025 | Item 05B - Expansion of Provisional Service - Issue Charge PDF | |
| 11.19.2025 | Item 05C - Expansion of Provisional Service - Work Plan PDF | |
| 11.19.2025 | Surplus Interconnection Request Summary PDF |
10.16.2025 - IPS Special Meeting
| 10.14.2025 | Agenda PDF | |
| 10.14.2025 | Agenda-doc DOC |
10.10.2025 - Interconnection Process Subcommittee
| 10.7.2025 | Agenda PDF | |
| 10.7.2025 | Agenda-doc DOC | |
| 10.7.2025 | Item 02 - Draft Minutes - IPS - 9.8.2025 PDF | |
| 10.7.2025 | Item 03 - Cycle Schedule Update Oct 2025 IPS PDF | |
| 10.7.2025 | Item 04 - Construction Metrics PDF | |
| 10.7.2025 | Item 05 - TC2 Phase 1 Reports PDF | |
| 10.7.2025 | Item 06 - TC2 DP1 Requirements PDF | |
| 10.10.2025 | Item 07 - NextGen Training for Project Developers for TC2 PDF | |
| 10.8.2025 | Item 08 - Transition Cyle 1 Decision Point III PDF | |
| 10.7.2025 | Transition Cycle 1 Post Decision Point III Process September 2025 IPS - Modified October 2025 PDF |
9.8.2025 - Interconnection Process Subcommittee
| 9.5.2025 | Agenda PDF | |
| 9.5.2025 | Agenda-doc DOC | |
| 9.4.2025 | Item 02 - Draft Minutes - IPS - 7.24.2025 PDF | |
| 9.4.2025 | Item 03 - Cycle Schedule Update PDF | |
| 9.4.2025 | Item 04a - Manual 14H Redlines PDF | |
| 9.4.2025 | Item 04 - Manual 14H Site Control Changes PDF | |
| 9.5.2025 | Item 05 - Transition Cycle 1 Post Decision Point III Process PDF | |
| 9.5.2025 | Item 06 - Letters of Credit TC1 P3 PDF | |
| 9.4.2025 | Item 07 - Land Acquisition and Responsibilities PDF |
7.24.2025 - Interconnection Process Subcommittee
| 7.24.2025 | Agenda PDF | |
| 7.24.2025 | Agenda-doc DOC | |
| 7.21.2025 | Item 02 - Draft Minutes - IPS - 6.26.2025 PDF | |
| 7.22.2025 | Item 03 - Cycle Schedule Update PDF | |
| 7.22.2025 | Item 04 - System Impact Study - SIS - Reports PDF | |
| 7.28.2025 | Item 05A - TC1 Example NUCRA PDF | |
| 7.28.2025 | Item 05B - TC1 Example GIA PDF | |
| 7.28.2025 | Item 05C - TC1 Example CSA PDF | |
| 7.23.2025 | Item 05 - Final Agreement Negotiation Phase and Decision Points III Requirements PDF | |
| 7.21.2025 | Item 06 - NextGen Data Migration Update PDF | |
| 7.22.2025 | Item 07 - TC1 Milestone Changes PDF |
6.26.2025 - Interconnection Process Subcommittee
5.28.2025 - Interconnection Process Subcommittee
| 5.23.2025 | Agenda PDF | |
| 5.23.2025 | Agenda-doc DOC | |
| 5.23.2025 | IPS - Elimination of First Use Work Plan PDF | |
| 5.23.2025 | IPS Elmination of First Use Options Package Matrix XLS | |
| 5.23.2025 | Item 02 - Draft Minutes - IPS - 4.24.2025 PDF | |
| 5.23.2025 | Item 03 - TC1 TC2 Update PDF | |
| 5.23.2025 | Item 04 - Interim Deliverability Study New Application Process PDF | |
| 5.23.2025 | Item 05 - TC1 Milestone Changes PDF | |
| 5.27.2025 | Item 06 - Fast Lane Observations PDF | |
| 5.23.2025 | Item 07 - NextGen Data Migration Update PDF | |
| 5.30.2025 | Item 07 - NextGen Data Migration Update - Post Meeting PDF | |
| 5.23.2025 | Item 09 - Elimination of First Use Solution Package PDF | |
| 6.27.2025 | Minutes PDF |
4.24.2025 - Interconnection Process Subcommittee
| 4.21.2025 | Agenda PDF | |
| 4.21.2025 | Agenda-doc DOC | |
| 4.21.2025 | IPS - Elimination of First Use - Options Packages Matrix XLS | |
| 4.21.2025 | Item 02 - Draft Minutes - IPS - 3.24.2025 PDF | |
| 4.24.2025 | Item 03 - Transition Status Update PDF | |
| 4.22.2025 | Item 04 - Reliability Resource Initiative Status Update PDF | |
| 4.21.2025 | Item 05 - Capacity Market Must Offer Requirement PDF | |
| 4.21.2025 | Item 06 - Affected System Study Update for TC Projects PDF | |
| 4.21.2025 | Item 07 - Surplus Interconnection Service PDF | |
| 4.21.2025 | Item 08 - Surplus Market Participation Training PDF |
3.24.2025 - Interconnection Process Subcommittee
| 3.20.2025 | Agenda PDF | |
| 3.20.2025 | Agenda-doc DOC | |
| 3.19.2025 | IPS - Elimination of First Use - Options Packages Matrix XLS | |
| 4.2.2025 | IPS - Elimination of First Use - Options Packages Matrix - Post Meeting XLS | |
| 3.19.2025 | Item 02 - Draft Minutes - IPS - 2.27.2025 PDF | |
| 3.21.2025 | Item 03 - Cycle Schedule Update PDF | |
| 3.19.2025 | Item 04 - Project Aggregation At Same POI PDF | |
| 3.19.2025 | Item 05 - Engineering and Procurement Agreement PDF | |
| 3.19.2025 | Item 06 - Planning Metrics PDF |
2.27.2025 - Interconnection Process Subcommittee
| 2.24.2025 | Agenda PDF | |
| 2.24.2025 | Agenda-doc DOC | |
| 2.24.2025 | IPS - Elimination of First Use - Options Packages Matrix XLS | |
| 2.24.2025 | Item 02 - Draft Minutes - IPS - 1.27.2025 PDF | |
| 2.24.2025 | Item 03 - Fast Lane Update and Transition Schedule PDF | |
| 2.24.2025 | Item 04 - TC1 DP2 Summary PDF | |
| 2.24.2025 | Item 05 - TC1 Model Updates PDF | |
| 2.24.2025 | Item 06 - TC1 Phase3 Study Activities PDF | |
| 2.24.2025 | Item 07 - TC2 Status Update PDF | |
| 2.24.2025 | Item 08 - NextGen Update PDF |
2.11.2025 - IPS Special Session - Reliability Resource Initiative Education
| 2.6.2025 | Agenda PDF | |
| 2.6.2025 | Agenda-doc DOC | |
| 2.6.2025 | Item 02 - IPS Special Session - Reliability Resource Initiative Education PDF |
1.27.2025 - Interconnection Process Subcommittee
| 1.22.2025 | Agenda PDF | |
| 1.22.2025 | Agenda-doc DOC | |
| 1.24.2025 | IPS - Elimination of First Use - Options Packages Matrix XLS | |
| 1.28.2025 | IPS Elimination of First Use - Options Packages Matrix - Post Meeting XLS | |
| 1.24.2025 | IPS - Elimination of First Use Work Plan PDF | |
| 1.22.2025 | Item 02 - Draft Minutes - IPS - 12.11.2024 PDF | |
| 1.24.2025 | Item 03 - Fast Lane TC1 Progress Update PDF | |
| 1.22.2025 | Item 04 - TC2 Kickoff Call Procedure PDF | |
| 1.22.2025 | Item 05 - Interconnection Billing Rate Update PDF | |
| 1.22.2025 | Item 06A - Issue Charge PDF | |
| 1.22.2025 | Item 06B - Problem Statement PDF | |
| 1.22.2025 | Item 06 - Elimination of First Use PDF |
12.11.2024 - Interconnection Process Subcommittee
| 12.10.2024 | Agenda PDF | |
| 12.10.2024 | Agend-doc DOC | |
| 12.6.2024 | Item 02 - Draft Minutes - IPS - 11.22.2024 PDF | |
| 12.6.2024 | Item 03 - Fast Lane TC1 Progress Update PDF | |
| 12.6.2024 | Item 04 - Reminders for Technical Data Submission PDF | |
| 12.10.2024 | Item 06 - Queue Point TC2 Tips and Reminders PDF |
11.22.2024 - Interconnection Process Subcommittee
| 11.19.2024 | 10.24.2024 - IPS - Draft Minutes PDF | |
| 11.19.2024 | Agenda PDF | |
| 11.19.2024 | Agenda-doc DOC | |
| 11.19.2024 | Item 03 - Fast Lane Progress PDF | |
| 11.20.2024 | Item 04 - Decision Point II Reminders PDF | |
| 11.19.2024 | Item 05 - Engineering and Procurement Agreement PDF | |
| 11.20.2024 | Item 06 - Final Agreement Negotiation PDF | |
| 11.20.2024 | Item 07 - System Impact Study Reports PDF | |
| 11.19.2024 | Item 08 - TC2 Resubmission Clarifications PDF | |
| 11.19.2024 | Item 09 - SLD Education for TC2 Submissions PDF | |
| 11.20.2024 | Item 10 - Expectations for Deficiency Cure Periods PDF |
10.24.2024 - Interconnection Process Subcommittee
| 10.21.2024 | 9.26.2024 - IPS - Draft Minutes PDF | |
| 10.21.2024 | Agenda PDF | |
| 10.21.2024 | Agenda-doc DOC | |
| 10.22.2024 | Item 03 - Fast Lane Progress PDF | |
| 10.23.2024 | Item 04 - Decision Point II Requirements PDF | |
| 10.21.2024 | Item 05 - Option to Build PDF | |
| 10.21.2024 | Item 06 - TC2 Application Reminders PDF |
9.26.2024 - Interconnection Process Subcommittee
| 9.23.2024 | Agenda PDF | |
| 9.23.2024 | Agenda-doc DOC | |
| 9.23.2024 | Item 02 - Draft Minutes 8.26.2024 IPS PDF | |
| 9.23.2024 | Item 03 - Fast Lane Progress Update PDF | |
| 9.23.2024 | Item 04 - Phase 2 Study Update PDF | |
| 9.23.2024 | Item 05 - DP1 Lessons Learned PDF | |
| 9.25.2024 | Item 06 - Site Control Requirements PDF | |
| 9.26.2024 | Item 06 - Site Control Requirements - Post Meeting PDF | |
| 9.23.2024 | Item 07 - IEEE 2800 Standard Recommendation PDF | |
| 9.23.2024 | Item 08 - Post GIA Changes PDF | |
| 9.23.2024 | Item 09 - NextGen Update PDF | |
| 9.23.2024 | Item 10A - Elimination of First Use PDF | |
| 9.23.2024 | Item 10B - Issue Charge PDF | |
| 9.23.2024 | Item 10C - Problem Statement PDF |
8.26.2024 - Interconnection Process Subcommittee
| 8.23.2024 | Agenda PDF | |
| 8.23.2024 | Agenda-doc DOC | |
| 8.21.2024 | Item 02 - Draft Minutes - IPS - 7.29.2024 PDF | |
| 8.23.2024 | Item 03 - Fast Lane Agreement Progress Update PDF | |
| 8.21.2024 | Item 05 - Phase 2 Update PDF | |
| 8.21.2024 | Item 06 - Affected System Study Next Steps for TC1 projects PDF |
7.29.2024 - Interconnection Process Subcommittee
| 7.29.2024 | Agenda PDF | |
| 7.29.2024 | Agenda-doc DOC | |
| 7.24.2024 | Item 02 - Draft Minutes - IPS - 6.21.2024 PDF | |
| 7.24.2024 | Item 03 - Fast Lane Agreement Progress Update PDF | |
| 7.25.2024 | Item 04 - TC1 DP1 Status PDF | |
| 7.24.2024 | Item 05 - TC2 Application Updates PDF | |
| 7.24.2024 | Item 06 - Final Agreement Negotiation Milestones PDF |
6.21.2024 - Interconnection Process Subcommittee
| 6.18.2024 | Agenda PDF | |
| 6.18.2024 | Agenda-doc DOC | |
| 6.18.2024 | Item 02 - Draft Minutes - IPS - 5.29.2024 PDF | |
| 6.18.2024 | Item 03 - Fast Lane and TC1 Progress Update PDF | |
| 6.25.2024 | Item 04 - Short Circuit Phase 2 PDF | |
| 6.18.2024 | Item 05 - Stability Study Process PDF | |
| 6.18.2024 | Item 06 - TC2 Application Requirements and Queue Point Process PDF | |
| 6.19.2024 | Item 07 - TC2 Deposits PDF | |
| 6.18.2024 | Item 08 - Interim Deliverability Requirements PDF | |
| 6.18.2024 | Item 09 - Initial Synchronization Process PDF | |
| 6.19.2024 | Item 10 - FERC Show Cause Order - Docket No. EL24-26-000 PDF |
5.29.2024 - Interconnection Process Subcommittee
| 5.24.2024 | Agenda PDF | |
| 5.24.2024 | Agenda-doc DOC | |
| 5.23.2024 | Capacity Interconnection Rights - CIR Transfer Efficiency - Options and Packages Matrix XLS | |
| 5.23.2024 | Item 02 - Draft Minutes - IPS - 5.13.2024 PDF | |
| 5.31.2024 | Item 03-04 - Fast Lane Progress Update - Model Availability PDF | |
| 5.23.2024 | Item 05 - Site Control Presentation PDF | |
| 5.24.2024 | Item 06 - TC1 DP1 Site Control Update PDF | |
| 5.28.2024 | Item 07 - NextGen High Level Update PDF | |
| 5.24.2024 | Item 08 - As-Built Documentation PDF | |
| 5.28.2024 | Item 09 - PJM Order No. 2023-A Compliance Filing - Attachment A - Summary - May 16 2024 PDF |
5.13.2024 - Interconnection Process Subcommittee
4.22.2024 - Interconnection Process Subcommittee
| 4.18.2024 | Agenda PDF | |
| 4.18.2024 | Agenda-doc DOC | |
| 4.17.2024 | Capacity Interconnection Rights - CIR Transfer Efficiency - Options and Packages Matrix XLS | |
| 4.17.2024 | Enhance CIR Transfer Efficiency - PJM Solution Package PDF | |
| 4.17.2024 | Item 02 - Draft Minutes - 4.11.2024 PDF | |
| 4.17.2024 | Item 04 - Fast Lane Progress Update PDF | |
| 6.25.2024 | Item 05 - Decision Point I Requirements PDF | |
| 4.17.2024 | Item 06 - LOC Template Updates PDF | |
| 4.25.2024 | Item 06 - LOC Template Updates - Post Meeting PDF | |
| 4.17.2024 | Item 07 - Decision Point 1 Facilitation in Queue Point PDF | |
| 4.17.2024 | Item 08 - Dynamic Modeling Guidelines for DP1 Submissions PDF | |
| 4.17.2024 | Item 09 - PJM.com Updates for DP1 PDF | |
| 4.17.2024 | Item 10 - System Impact Study Report PDF | |
| 4.18.2024 | Item 11 - Show Cause Proceeding - IPS - April 2024 PDF |
4.11.2024 - Interconnection Process Subcommittee
4.5.2024 - Interconnection Process Subcommittee
3.22.2024 - Interconnection Process Subcommittee
| 3.19.2024 | Agenda PDF | |
| 3.19.2024 | Agenda-doc DOC | |
| 3.19.2024 | Capacity Interconnection Rights - CIR - Transfer Efficiency - Options and Packages Matrix XLS | |
| 3.20.2024 | Item 02 - Draft Minutes - IPS - 3.8.2024 PDF | |
| 3.19.2024 | Item 03 - CIR Transfer Process Work Plan XLS | |
| 3.19.2024 | Item 04 - Fast Lane Progress Update PDF | |
| 3.19.2024 | Item 05 - Decision Point I Requirements and Off-Ramp to Final Agreement PDF | |
| 3.19.2024 | Item 06 - Dynamic Modeling Guidelines for DP1 Submissions PDF | |
| 3.19.2024 | Item 07 - Easement Education PDF | |
| 3.19.2024 | Item 08 - Letters of Credit RD2 PDF |
3.8.2024 - Interconnection Process Subcommittee
2.23.2024 - Interconnection Process Subcommittee
| 2.20.2024 | Agenda PDF | |
| 2.20.2024 | Agenda-doc DOC | |
| 2.27.2024 | Agenda - Post Meeting PDF | |
| 2.27.2024 | Agenda - Post Meeting-doc DOC | |
| 2.22.2024 | Capacity Interconnection Rights - CIR - Transfer Efficiency - Options and Packages Matrix XLS | |
| 2.27.2024 | Capacity Interconnection Rights - CIR - Transfer Efficiency - Options and Packages Matrix - Post Meeting XLS | |
| 2.20.2024 | Item 02 - Draft Minutes - IPS - 2.9.24 PDF | |
| 2.23.2024 | Item 03 - Fast Lane Progress Update PDF | |
| 2.27.2024 | Item 03 - Fast Lane Progress Update - Post Meeting PDF | |
| 2.20.2024 | Item 04 - IPS Site Plan Expectations PDF | |
| 2.20.2024 | Item 05 - Site Control Review Spreadsheet PDF | |
| 2.23.2024 | Item 06 - Milestone Establishment and Obligation PDF | |
| 2.27.2024 | Item 06 - Milestone Establishment and Obligation - Post Meeting PDF | |
| 2.22.2024 | RMI - Feb 23 2024 presentation to IPS PDF | |
| 2.27.2024 | Site Control Review - Draft XLS |
2.9.2024 - Interconnection Process Subcommittee
1.29.2024 - Interconnection Process Subcommittee
| 1.24.2024 | Agenda PDF | |
| 1.24.2024 | Agenda-doc DOC | |
| 1.24.2024 | Capacity Interconnection Rights - CIR - Transfer Efficiency - Options and Packages Matrix XLS | |
| 1.31.2024 | Capacity Interconnection Rights - CIR - Transfer Efficiency - Options and Packages Matrix Post Meeting XLS | |
| 1.24.2024 | Item 02 - Draft Minutes - IPS - 1-19-2024 PDF | |
| 1.24.2024 | Item 03 - 2024 Roadmap PDF | |
| 1.31.2024 | Item 03 - 2024 Roadmap Post Meeting PDF | |
| 1.24.2024 | Item 04 - Fast Lane - TC1 Status Update PDF | |
| 1.31.2024 | Item 04 - Fast Lane - TC1 Status Update Post Meeting PDF | |
| 1.24.2024 | Item 05 - Interconnection Projects Readiness Review Lessons Learned Debrief PDF | |
| 1.24.2024 | Item 06 - Draft Agreements in DocuTrack PDF | |
| 1.26.2024 | Item 07 - Additional Deposits PDF | |
| 2.6.2024 | Item 08 - CIR Transfer Efficiency_POI PDF |
1.19.2024 - Interconnection Process Subcommittee
12.21.2023 - Interconnection Process Subcommittee
| 12.18.2023 | Agenda PDF | |
| 12.18.2023 | Agenda-doc DOC | |
| 12.18.2023 | Capacity Interconnection Rights - CIR - Transfer Efficiency - Options and Packages Matrix XLS | |
| 1.9.2024 | Capacity Interconnection Rights - CIR - Transfer Efficiency - Options and Packages Matrix - POST Meeting XLS | |
| 12.18.2023 | Item 02 - Draft Minutes - IPS - 11.20.2023 PDF | |
| 12.21.2023 | Item 03 - Interconnection Projects Update PDF | |
| 12.18.2023 | Item 04 - IPS presentation PDF | |
| 12.18.2023 | Item 05 - Developer Training PDF | |
| 12.18.2023 | Item 06 - CIR Transfer Process Work Plan XLS |
11.20.2023 - Interconnection Process Subcommittee
10.30.2023 - Interconnection Process Subcommittee
| 10.25.2023 | Agenda PDF | |
| 10.25.2023 | Agenda-doc DOC | |
| 10.25.2023 | Capacity Interconnection Rights - CIR - Transfer Efficiency - Options and Packages Matrix XLS | |
| 10.25.2023 | Item 02 - Draft Minutes - IPS - 9.27.2023 PDF | |
| 10.25.2023 | Item 03 - Readiness Update PDF | |
| 10.25.2023 | Item 04 - IPS_October2023-Transition Sort Retool And Model Availability PDF | |
| 10.25.2023 | Item 05 - Queue Scope Geospatial_IPS_10.30.23 PDF | |
| 10.25.2023 | Item 06 - Dynamic Modeling Guidelines for Stability Studies_updated 10-20-23 PDF | |
| 10.25.2023 | Item 07 - Developer Training_Oct IPS PDF | |
| 10.25.2023 | Item 08 - How CIR transfer efficiency can support state policy goals PDF | |
| 10.26.2023 | Item 09 - RMI CIR transfer efficiency solution options PDF |
9.27.2023 - Interconnection Process Subcommittee
8.28.2023 - Interconnection Process Subcommittee
7.31.2023 - Interconnection Process Subcommittee
6.26.2023 - Interconnection Process Subcommittee
| 6.26.2023 | Agenda PDF | |
| 6.26.2023 | Agenda-doc DOC | |
| 6.21.2023 | Item 02 - Draft Minutes - IPS - 05.25.2023 PDF | |
| 6.23.2023 | Item 04 - Interconnection Projects IPS Queue Update June 2023 PDF | |
| 6.22.2023 | Item 05 - Queue Point Enhancements for Transition PDF | |
| 6.21.2023 | Item 06 - Interconnection Projects IPS Transition Window PDF | |
| 6.23.2023 | Item 07 - IPS Affected System PDF |
5.25.2023 - Interconnection Process Subcommittee
| 5.22.2023 | Agenda PDF | |
| 5.22.2023 | Agenda-doc DOC | |
| 5.23.2023 | Item 02 - Draft Minutes - IPS - 5.18.2023 PDF | |
| 5.22.2023 | Item 03 - Interconnection Projects IPS Queue Update May 2023 PDF | |
| 5.23.2023 | Item 04 - Interconnection Projects IPS Transition Window May 2023 Final PDF | |
| 5.25.2023 | Item 04 - Interconnection Projects IPS Transition Window May 2023 Final - POST MEETING PDF | |
| 5.22.2023 | Item 05 - Interim Deliverability study process improvements PDF | |
| 5.23.2023 | Item 06b - M14H Clean PDF | |
| 5.23.2023 | Item 06c - M14H Redlined PDF | |
| 5.25.2023 | Item 06 - IPS_May 25 2023-Manual M14H Updates PDF |
5.18.2023 - Interconnection Process Subcommittee
4.24.2023 - Interconnection Process Subcommittee
3.27.2023 - Interconnection Process Subcommittee
| 3.22.2023 | Agenda PDF | |
| 3.22.2023 | Agenda-doc DOC | |
| 3.22.2023 | Item 02 - Draft Minutes - IPS - 02.27.2023 PDF | |
| 3.22.2023 | Item 03 - Interconnection Projects IPS Queue Update March 2023 PDF | |
| 3.22.2023 | Item 04 - IPS Manual Language Update March 2023 PDF | |
| 3.22.2023 | Item 05 - NJ SAA Overview PDF | |
| 3.23.2023 | Item 06 - Interconnection Projects IPS Transition March 2023 PDF | |
| 8.10.2023 | UPDATED 08.10.2023 - Transition Procedure Document _Revision 1.0_ 032423_SUPERSEDED PDF |
2.27.2023 - Interconnection Process Subcommittee
| 2.24.2023 | Agenda PDF | |
| 2.24.2023 | Agenda-doc DOC | |
| 2.24.2023 | Item 02 - Draft Minutes - IPS - 01.30.2023 PDF | |
| 2.24.2023 | Item 03 - Transitional Resource Request Process For CIR For ELCC Resources Solution Package PDF | |
| 2.24.2023 | Item 04 - Interconnection Projects IPS Queue Update FEB 2023_Final PDF | |
| 2.24.2023 | Item 05 - IPRTF process implementation PDF | |
| 2.27.2023 | Item 06 - Results Only Reports - 2.21.2023 PDF | |
| 2.27.2023 | Item 06 - Results Only Reports - 2.21.2023 PDF | |
| 2.24.2023 | Item 07 - Interconnection Projects - Poll for Topics PDF |
1.30.2023 - Interconnection Process Subcommittee
| 1.27.2023 | Agenda PDF | |
| 1.27.2023 | Agenda-doc DOC | |
| 1.27.2023 | Item 02 - Draft Minutes - IPS - 11.22.2022 PDF | |
| 1.27.2023 | Item 04 - Transition Update - IPS - Jan 2023 PDF | |
| 1.27.2023 | Item 05A - Interconnection Queue Status Update - IPS - Jan 2023 PDF | |
| 1.27.2023 | Item 05B - Interconnection Analysis Update - IPS - Jan 2023 PDF |
11.22.2022 - Interconnection Process Subcommittee
| 11.18.2022 | Agenda PDF | |
| 11.18.2022 | Agenda-doc DOC | |
| 11.18.2022 | Item 02 - Draft Minutes - IPS - 09.28.2022 PDF | |
| 11.18.2022 | Item 02 - Draft Minutes - IPS - 09.28.2022-doc DOC | |
| 11.18.2022 | Item 03 - Queue Status Update PDF | |
| 11.18.2022 | Item 04 - Queue Scope - Take a Tour - rev1 PDF |
10.27.2022 - Interconnection Process Subcommittee
9.28.2022 - Interconnection Process Subcommittee
| 9.23.2022 | Agenda PDF | |
| 9.23.2022 | Agenda-doc DOC | |
| 9.23.2022 | Item 02 - Draft Minutes - IPS - 8.18.2022 PDF | |
| 9.23.2022 | Item 03 - PJM Interconnection Reform Filing Update PDF | |
| 9.23.2022 | Item 04 - FERC Interconnection NOPR PDF | |
| 9.26.2022 | Item 05 - Overview of Queue Scope PDF | |
| 9.23.2022 | Item 06 - Surplus Interconnection Service Education PDF |
8.18.2022 - Interconnection Process Subcommittee
| 8.15.2022 | Agenda PDF | |
| 8.15.2022 | Agenda-doc DOC | |
| 8.15.2022 | Item 02 - Subcommittee Participation Tips & Tricks PDF | |
| 8.15.2022 | Item 03 - Subcommittee Operations and Organization and IPS Workflow PDF | |
| 8.15.2022 | Item 04 - IPS Charter PDF | |
| 8.15.2022 | Item 05 - FERC Interconnection NOPR PDF | |
| 8.15.2022 | Item 06 - Affected Systems Studies Coordination PDF |
Materials submitted to PJM by PJM Members or any other stakeholder for posting on PJM.com shall not imply support or endorsement by PJM Interconnection.